Sample records for western electricity coordinating

  1. Topic A Awardee: Western Electricity Coordinating Council | Department...

    Office of Environmental Management (EM)

    factor in variables including electric demand, generation resources, energy policies, technology costs, impacts on transmission reliability, and emissions. The resulting...

  2. Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council

    SciTech Connect (OSTI)

    Kuiper, James A.; Cantwell, Brian J.; Hlava, Kevin J.; Moore, H Robert; Orr, Andrew B.; Zvolanek, Emily A.

    2014-02-24T23:59:59.000Z

    This report, Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council (WECC), was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). The intent of WECC’s work was to identify planning-level energy corridors that the Department of Energy (DOE) and its affiliates could study in greater detail. Argonne was tasked by DOE to analyze the WECC Proposed Energy Corridors in five topic areas for use in reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. In compliance with Section 368 of the Energy Policy Act of 2005 (EPAct), the Secretaries of Energy, Agriculture, and the Interior (Secretaries) published a Programmatic Environmental Impact Statement in 2008 to address the proposed designation of energy transport corridors on federal lands in the 11 western states. Subsequently, Records of Decision designating the corridors were issued in 2009 by the Bureau of Land Management (BLM) and the U.S. Forest Service (USFS). The 2012 settlement of a lawsuit, brought by The Wilderness Society and others against the United States, which identified environmental concerns for many of the corridors requires, among other things, periodic reviews of the corridors to assess the need for revisions, deletions, or additions. A 2013 Presidential Memorandum requires the Secretaries to undertake a continuing effort to identify and designate energy corridors. The WECC Proposed Energy Corridors and their analyses in this report provide key information for reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. Load centers and generation hubs identified in the WECC analysis, particularly as they reflect renewable energy development, would be useful in reviewing and potentially updating the designated Section 368 corridor network. Argonne used Geographic Information System (GIS) technology to analyze the proposed energy corridors in the WECC report in five topic areas: ? Federal land jurisdiction, ? Existing Section 368 corridors, ? Existing transmission lines, ? Previously studied corridor locations, and ? Protected areas. Analysis methods are explained and tables and maps are provided to describe the results of the analyses in all five topic areas. WECC used a rational approach to connecting the hubs it identified, although there may be opportunities for adapting some of the proposed WECC routes to previously designated Section 368 corridors, for example: ? The WECC proposed energy corridors are in fact centerlines of proposed routes connecting hubs of various descriptions related to electric energy transmission. Although the centerlines were sited to avoid sensitive areas, infrastructure proposed within actual pathways or corridors defined by the centerlines would sometimes affect lands where such development would not normally be allowed, such as National Parks and Monuments, National Wildlife Refuges, and Wilderness Areas. ? Many WECC proposed energy corridors are sited along centerlines of existing roads, including Interstate Highways, where in some cases additional width to accommodate energy transmission infrastructure may not be available. Examples include the WECC Proposed Corridor along Interstate 70 through Glenwood Canyon in Colorado, and along U.S. Highway 89 across Glen Canyon Dam in Arizona. ? Several WECC proposed energy corridors are parallel to designated Section 368 corridors that have already cleared the preliminary steps to right-of-way approval. In many of these cases, the WECC hub connection objectives can be met more efficiently by routing on the designated Section 368 corridors.

  3. Transmission Planning Process and Opportunities for Utility-Scale Solar Engagement within the Western Electricity Coordinating Council (WECC)

    SciTech Connect (OSTI)

    Hein, J.; Hurlbut, D.; Milligan, M.; Coles, L.; Green, B.

    2011-11-01T23:59:59.000Z

    This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. Market barriers unrelated to technology often limit the expansion of utility-scale solar power, even in areas with exceptional resource potential. Many of these non-technical barriers have to do with policy, regulation, and planning, and hardly ever do they resolve themselves in a timely fashion. In most cases, pre-emptive intervention by interested stakeholders is the easiest way to remove/address such barriers, but it requires knowing how to navigate the institutional waters of the relevant agencies and boards. This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. It focuses on the Western Interconnection (WI), primarily because the quality of solar resources in the Southwest makes utility-scale concentrating solar power (CSP) and photovoltaics (PV) economically feasible, and because the relevant institutions have evolved in a way that has opened up opportunities for removing non-technical market barriers. Developers will find in this report a high-level field manual to identify the venues for mitigating and possibly eliminating systemic market obstacles and ensuring that the economic playing field is reasonably level. Project-specific issues such as siting for transmission and generation resources are beyond the scope of this report. Instead, the aim is to examine issues that pervasively affect all utility-scale PV and CSP in the region regardless of where the project may be. While the focus is on the WI, many of the institutions described here also have their counterparts in the Eastern and the Texas interconnections. Specifically, this report suggests a number of critical engagement points relating to generation and transmission planning.

  4. 10 Year Transmission Plan for the Western Electricity Interconnection Released

    Broader source: Energy.gov [DOE]

    The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities.

  5. Western Massachusetts Electric- Commercial Energy Efficiency Rebates

    Broader source: Energy.gov [DOE]

    Western Massachusetts Electric (WMECO) helps commercial and industrial customers offset the additional costs of purchasing and installing energy efficient equipment. WMECO offers rebates for...

  6. Case Study - Western Electricity Coordinating Council

    Broader source: Energy.gov (indexed) [DOE]

    capacity or build new lines, yielding significant financial savings. Renewable Resource Integration The West has rich wind resources, but the variability of these resources poses...

  7. Case Study - Western Electricity Coordinating Council

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S. Department ofJuneWaste To Wisdom:EnergyJoshua DeLung WhatFloridaSmart Grid

  8. Western Electricity Coordinating Council | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTri GlobalJump to: navigation,Goff,HoltWestchester County, New

  9. Electricity markets in the western United States

    SciTech Connect (OSTI)

    Bailey, E.M.

    1998-07-01T23:59:59.000Z

    This article introduces the use of rigorous econometric tools to understand the geographic scope of the market for generation services. These tools are applied to data from the current wholesale electricity market in the western United States. The behavior of the current wholesale electricity market and the methods used to assess the expanse of the geographic market in the current wholesale electricity market can go a long way toward informing the discussion of pricing behavior and performance in a restructured electricity industry. First, the current wholesale electricity market is already effectively unregulated and suffers from the same technical complexities that face a retail electricity market. Consequently, understanding the supply and demand conditions that cause the extent of the geographic market for generation services to narrow in the current wholesale electricity market can shed light on which times the geographic expanse of the market may narrow in a restructures electricity market. Second, the techniques developed in this paper to assess the extent of the current wholesale electricity market can be applied readily to a restructured electricity market. Finally, because market conditions in the electricity industry are likely to change significantly in the next few years, as the structure of the electricity sector changes dramatically, this analysis of the geographic expanse of the market can provide a useful benchmark against which to compare post-restructuring wholesale price relationships.

  10. Simulating the Impact of a Carbon Market Electricity System in the Western U.S.A.

    E-Print Network [OSTI]

    Ford, Andrew

    and engineering methods. This approach has been implemented in a model of the WECC, the Western Electricity Coordinating Council. The methods and assumptions of the WECC model are explained in the appendicies Act C. Electricity Generation 4. Could We See Similar Results in the WECC? D. Wholesale and Retail

  11. Distributed Regulation Allocation with Aggregator Coordinated Electric Vehicles

    E-Print Network [OSTI]

    Liang, Ben

    Distributed Regulation Allocation with Aggregator Coordinated Electric Vehicles Sun Sun, Min Dong, and Ben Liang Dept. of Electrical and Computer Engineering, University of Toronto, Canada Dept. of Electrical, Computer and Software Engineering, University of Ontario Institute of Technology, Canada Email

  12. NorthWestern Energy Community Works Scholarship for Electrical Engineering

    E-Print Network [OSTI]

    Dyer, Bill

    20131030 NorthWestern Energy Community Works Scholarship for Electrical Engineering A special Electrical Engineering, NorthWestern Energy has established a scholarship program administered by the Montana and interests, and how they relate to electrical engineering, energy production, control, and/or transmission

  13. NorthWestern Energy Community Works Scholarship for Electrical Engineering

    E-Print Network [OSTI]

    Lawrence, Rick L.

    20121204 NorthWestern Energy Community Works Scholarship for Electrical Engineering A special new Electrical Engineering, NorthWestern Energy has established a scholarship program administered by the Montana, and how they relate to electrical engineering, energy production, control, and/or transmission. Within

  14. Western Massachusetts Electric- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Western Massachusetts Electric (WMECO) and Masssave, a collaboration of Massachusetts municipalities and cooperatives, provides technical assistance and financial incentives to customers who...

  15. Coordinated Multilateral Trades for Electric Power Networks: Theory and Implementation

    E-Print Network [OSTI]

    California at Berkeley. University of

    Felix F. Wu and Pravin Varaiya June 1995 This paper is part of the working papers series of the Program earlier, the constraint equations are usually derived with built-in safety margins, they are soft;Coordinated Multilateral Trades for Electric Power Networks: Theory and Implementation 50 of 51

  16. WECC releases its first-ever transmission plan for the Western Interconnection

    Broader source: Energy.gov [DOE]

    The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection.

  17. Methodology The electricity generation and distribution network in the Western United States is

    E-Print Network [OSTI]

    Hall, Sharon J.

    Methodology The electricity generation and distribution network in the Western United States is comprised of power plants, electric utilities, electrical transformers, transmission and distribution infrastructure, etc. We conceptualize the system as a transportation network with resources (electricity

  18. Western Electricity Coordinating Council Smart Grid Project | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwideWTED JumpHills, NewWestbrook, Minnesota:

  19. Topic A Awardee: Western Electricity Coordinating Council | Department of

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently AskedEnergyIssuesEnergy SolarRadioactiveI DisposalFive Things YouDepartment

  20. Physical Impacts of Climate Change on the Western US Electricity System: A Scoping Study

    SciTech Connect (OSTI)

    Coughlin, Katie; Goldman, Charles

    2008-12-01T23:59:59.000Z

    This paper presents an exploratory study of the possible physical impacts of climate change on the electric power system, and how these impacts could be incorporated into resource planning in the Western United States. While many aspects of climate change and energy have been discussed in the literature, there has not yet been a systematic review of the relationship between specific physical effects and the quantitative analyses that are commonly used in planning studies. The core of the problem is to understand how the electric system is vulnerable to physical weather risk, and how to make use of information from climate models to characterize the way these risks may evolve over time, including a treatment of uncertainty. In this paper, to provide the necessary technical background in climate science, we present an overview of the basic physics of climate and explain some of the methodologies used in climate modeling studies, particularly the importance of emissions scenarios. We also provide a brief survey of recent climate-related studies relevant to electric system planning in the Western US. To define the institutional context, we discuss the core elements of the resource and reliability planning processes used currently by utilities and by the Western Electricity Coordinating Council. To illustrate more precisely how climate-related risk could be incorporated into modeling exercises, we discuss three idealized examples. Overall, we argue that existing methods of analysis can and should be extended to encompass the uncertainties related to future climate. While the focus here is on risk related to physical impacts, the same principles apply to a consideration of how future climate change policy decisions might impact the design and functioning of the electric grid. We conclude with some suggestions and recommendations on how to begin developing this approach within the existing electric system planning framework for the West.

  1. Energy Efficiency in Western Utility Resource Plans: Impacts on Regional Resources Assessment and Support for WGA Policies

    E-Print Network [OSTI]

    Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

    2006-01-01T23:59:59.000Z

    Interconnection overseen by the Western Electricity Coordinating Council (WECC), which includes Arizona, California, Colorado, Idaho, Montana, New Mexico,

  2. Comments by the American Electric Power System on Proposed Coordination of Federal Authorizations for Electric Transmission Facilities

    Broader source: Energy.gov [DOE]

     Proposed Coordination of Federal Authorizations for Electric Transmission Facilities – Interim Final Rule and Proposed Rule (DOE, 10 CR Part 900): The utility operating companies of the American...

  3. On Coordinating Electricity Markets: Smart Power Scheduling for Demand Side Management and Economic Dispatch

    E-Print Network [OSTI]

    Chen, Yiling

    On Coordinating Electricity Markets: Smart Power Scheduling for Demand Side Management and Economic;On Coordinating Electricity Markets: Smart Power Scheduling for Demand Side Management and Economic Dispatch Abstract Information asymmetry in retail electricity markets is one of the largest sources of inef

  4. Analysis of drought impacts on electricity production in the Western and Texas interconnections of the United States.

    SciTech Connect (OSTI)

    Harto, C. B.; Yan, Y. E.; Demissie, Y. K.; Elcock, D.; Tidwell, V. C.; Hallett, K.; Macknick, J.; Wigmosta, M. S.; Tesfa, T. K. (Environmental Science Division); (Sandia National Laboratory); (National Renewable Energy Laboratory); (Pacific Northwest National Laboratory)

    2012-02-09T23:59:59.000Z

    Electricity generation relies heavily on water resources and their availability. To examine the interdependence of energy and water in the electricity context, the impacts of a severe drought to assess the risk posed by drought to electricity generation within the western and Texas interconnections has been examined. The historical drought patterns in the western United States were analyzed, and the risk posed by drought to electricity generation within the region was evaluated. The results of this effort will be used to develop scenarios for medium- and long-term transmission modeling and planning efforts by the Western Electricity Coordination Council (WECC) and the Electric Reliability Council of Texas (ERCOT). The study was performed in response to a request developed by the Western Governors Association in conjunction with the transmission modeling teams at the participating interconnections. It is part of a U.S. Department of Energy-sponsored, national laboratory-led research effort to develop tools related to the interdependency of energy and water as part of a larger interconnection-wide transmission planning project funded under the American Recovery and Reinvestment Act. This study accomplished three main objectives. It provided a thorough literature review of recent studies of drought and the potential implications for electricity generation. It analyzed historical drought patterns in the western United States and used the results to develop three design drought scenarios. Finally, it quantified the risk to electricity generation for each of eight basins for each of the three drought scenarios and considered the implications for transmission planning. Literature on drought impacts on electricity generation describes a number of examples where hydroelectric generation capacity has been limited because of drought but only a few examples of impact on thermoelectric generation. In all documented cases, shortfalls of generation were met by purchasing power from the market, albeit at higher prices. However, sufficient excess generation and transmission must be available for this strategy to work. Although power purchase was the most commonly discussed drought mitigation strategy, a total of 12 response strategies were identified in the literature, falling into four main categories: electricity supply, electricity demand response, alternative water supplies, and water demand response. Three hydrological drought scenarios were developed based on a literature review and historical data analysis. The literature review helped to identify key drought parameters and data on drought frequency and severity. Historical hydrological drought data were analyzed for the western United States to identify potential drought correlations and estimate drought parameters. The first scenario was a West-wide drought occurring in 1977; it represented a severe drought in five of the eight basins in the study area. A second drought scenario was artificially defined by selecting the conditions from the 10th-percentile drought year for each individual basin; this drought was defined in this way to allow more consistent analysis of risk to electricity generation in each basin. The final scenario was based upon the current low-flow hydro modeling scenario defined by WECC, which uses conditions from the year 2001. These scenarios were then used to quantify the risk to electricity generation in each basin. The risk calculations represent a first-order estimate of the maximum amount of electricity generation that might be lost from both hydroelectric and thermoelectric sources under a worst-case scenario. Even with the conservative methodology used, the majority of basins showed a limited amount of risk under most scenarios. The level of risk in these basins is likely to be amenable to mitigation by known strategies, combined with existing reserve generation and transmission capacity. However, the risks to the Pacific Northwest and Texas Basins require further study. The Pacific Northwest is vulnerable because of its heavy reliance on hydroelectri

  5. Combining Balancing Areas' Variability: Impacts on Wind Integration in the Western Interconnection

    SciTech Connect (OSTI)

    Milligan, M.; Kirby, B.; Beuning, S.

    2010-07-01T23:59:59.000Z

    This paper investigates the potential impact of balancing area cooperation on a large-scale in the Western Electricity Coordinating Council (WECC).

  6. Survey of Western U.S. Electric Utility Resource Plans

    E-Print Network [OSTI]

    Wilkerson, Jordan

    2014-01-01T23:59:59.000Z

    future peak power and energy demand, electricity generation,timelines, and energy demand. An inaccurate prediction ofto reduce their annual energy demand in 2020 by 39 TWh (

  7. Coordinated Control and Optimization of Virtual Power Plants for Energy and Frequency Regulation Services in Electricity Markets

    E-Print Network [OSTI]

    Zhang, Fan

    2012-02-14T23:59:59.000Z

    . The potential economic benefits of this bidding strategy are demonstrated under Denmark wholesale electricity market structure. Four case studies show the economic benefit of coordinating VPPs....

  8. Electricity Policy Coordination and Implementation | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 Russian NuclearandJunetrack graphics4DimitriJuneEnergy ElectricityOE is

  9. Western Coop Electric Assn Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTri GlobalJump to: navigation,Goff,HoltWestchester County, New York:Western

  10. National Electric Transmission Study 2006 Western Interconnection Analysis

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently Asked QuestionsDepartment of Energyof Energy U.S.August 2014Western

  11. Impacts of Western Area Power Administration`s power marketing alternatives on electric utility systems

    SciTech Connect (OSTI)

    Veselka, T.D.; Portante, E.C.; Koritarov, V. [and others

    1995-03-01T23:59:59.000Z

    This technical memorandum estimates the effects of alternative contractual commitments that may be initiated by the Western Area Power Administration`s Salt Lake City Area Office. It also studies hydropower operational restrictions at the Salt Lake City Area Integrated Projects in combination with these alternatives. Power marketing and hydropower operational effects are estimated in support of Western`s Electric Power Marketing Environmental Impact Statement (EIS). Electricity production and capacity expansion for utility systems that will be directly affected by alternatives specified in the EIS are simulated. Cost estimates are presented by utility type and for various activities such as capacity expansion, generation, long-term firm purchases and sales, fixed operation and maintenance expenses, and spot market activities. Operational changes at hydropower facilities are also investigated.

  12. Multi-Agent Based Techniques for Coordinating the Distribution of Electricity in a Micro-Grid Environment

    E-Print Network [OSTI]

    Southampton, University of

    and agent managed microgrids. Fred Schweppe, a recognised world leader in the field of electric powerMulti-Agent Based Techniques for Coordinating the Distribution of Electricity in a Micro-Grid will be required which incor- porates intermittent renewable resources, micro-generators, micro-storage devices

  13. Regional economic impacts of changes in electricity rates resulting from Western Area Power Administration`s power marketing alternatives

    SciTech Connect (OSTI)

    Allison, T.; Griffes, P.; Edwards, B.K.

    1995-03-01T23:59:59.000Z

    This technical memorandum describes an analysis of regional economic impacts resulting from changes in retail electricity rates due to six power marketing programs proposed by Western Area Power Administration (Western). Regional economic impacts of changes in rates are estimated in terms of five key regional economic variables: population, gross regional product, disposable income, employment, and household income. The REMI (Regional Impact Models, Inc.) and IMPLAN (Impact Analysis for Planning) models simulate economic impacts in nine subregions in the area in which Western power is sold for the years 1993, 2000, and 2008. Estimates show that impacts on aggregate economic activity in any of the subregions or years would be minimal for three reasons. First, the utilities that buy power from Western sell only a relatively small proportion of the total electricity sold in any of the subregions. Second, reliance of Western customers on Western power is fairly low in each subregion. Finally, electricity is not a significant input cost for any industry or for households in any subregion.

  14. SCENARIOS FOR DEEP CARBON EMISSION REDUCTIONS FROM ELECTRICITY BY 2050 IN WESTERN NORTH AMERICA USING THE SWITCH ELECTRIC POWER SECTOR PLANNING MODEL California's Carbon Challenge Phase II Volume II

    SciTech Connect (OSTI)

    Collaboration / University of California, Berkeley; Nelson, James; Mileva, Ana; Johnston, Josiah; Kammen, Daniel; Wei, Max; Greenblatt, Jeffrey

    2014-01-01T23:59:59.000Z

    This study used a state-of-the-art planning model called SWITCH for the electric power system to investigate the evolution of the power systems of California and western North America from present-day to 2050 in the context of deep decarbonization of the economy. Researchers concluded that drastic power system carbon emission reductions were feasible by 2050 under a wide range of possible futures. The average cost of power in 2050 would range between $149 to $232 per megawatt hour across scenarios, a 21 to 88 percent increase relative to a business-as-usual scenario, and a 38 to 115 percent increase relative to the present-day cost of power. The power system would need to undergo sweeping change to rapidly decarbonize. Between present-day and 2030 the evolution of the Western Electricity Coordinating Council power system was dominated by implementing aggressive energy efficiency measures, installing renewable energy and gas-fired generation facilities and retiring coal-fired generation. Deploying wind, solar and geothermal power in the 2040 timeframe reduced power system emissions by displacing gas-fired generation. This trend continued for wind and solar in the 2050 timeframe but was accompanied by large amounts of new storage and long-distance high-voltage transmission capacity. Electricity storage was used primarily to move solar energy from the daytime into the night to charge electric vehicles and meet demand from electrified heating. Transmission capacity over the California border increased by 40 - 220 percent by 2050, implying that transmission siting, permitting, and regional cooperation will become increasingly important. California remained a net electricity importer in all scenarios investigated. Wind and solar power were key elements in power system decarbonization in 2050 if no new nuclear capacity was built. The amount of installed gas capacity remained relatively constant between present-day and 2050, although carbon capture and sequestration was installed on some gas plants by 2050.

  15. NorthWestern Energy (Electric)- Commercial Energy Efficiency Rebate Program (Montana)

    Broader source: Energy.gov [DOE]

    NorthWestern Energy offers multiple rebate programs for commercial and industrial customers to make energy efficient improvements to their businesses. This includes lighting, heating, irrigators,...

  16. Locational-based Coupling of Electricity Markets: Benefits from Coordinating Unit Commitment and Balancing Markets

    E-Print Network [OSTI]

    van der Weijde, Adriaan Hendrik; Hobbs, Benjamin F.

    We formulate a series of stochastic models for committing and dispatching electric generators subject to transmission limits. The models are used to estimate the benefits of electricity locational marginal pricing (LMP) that arise from better...

  17. Estimation of Relative Position and Coordination of Mobile Underwater Robotic Platforms through Electric Sensing

    E-Print Network [OSTI]

    Boyer, Edmond

    examples. The approach is shown to allow coordination of unmanned underwater vehicles, including that of relative positioning for groups of cooperating underwater agents. More specifically, unmanned underwater System (GPS) constella- tion. Instead, underwater vehicles have come to rely on a number of alternate

  18. Risk-Based Strategies for Wind/Pumped-Hydro Coordination under Electricity Markets

    E-Print Network [OSTI]

    Boyer, Edmond

    for the intra-day scheduling and operation of such a plant in an electricity market environment. Such method, such as day-ahead or intra-day electricity markets. For participating in short-term markets, power producers must make market bidding decisions about the amount of energy to contract and at which price

  19. Multidimensional Geometrical Model of the Electrical and SU(2) Colour Charge with Splitting off the Supplementary Coordinates

    E-Print Network [OSTI]

    V. D. Dzhunushaliev

    1996-12-16T23:59:59.000Z

    The geometrical model of an electrical charge is proposed. This model has the ''nake'' charge shunted with ``fur - coat'' consisting of virtual wormholes. The 5D wormhole solution in the Kaluza - Klein's theory is the ''nake'' charge. The splitting off the supplementary coordinates happens on the two spheres (null surfaces) bounding this 5D wormhole. This allows to sew two Reissner - Nordstr\\"om's black holes to it on both sides. Virtual wormholes entrap a part of the electrical force lines outcoming from ''nake'' charge. This effect can essentially decrease the charge visible at infinity up to real relation $m^2 < e^2$. The analogical construction for colour SU(2) gauge charge is made.

  20. Physical Impacts of Climate Change on the Western US Electricity System: A Scoping Study

    E-Print Network [OSTI]

    Coughlin, Katie

    2008-01-01T23:59:59.000Z

    Lett. 34:L19703. [46] WECC 2005. Power Supply Assessment.=index&req=getit&lid [56] WECC Planning Data White Paper,Coordinating Council (WECC) [46, 55, 56], while our

  1. Abstract--The California Independent System Operator Corporation (CAISO) is in charge of managing the electricity

    E-Print Network [OSTI]

    McCalley, James D.

    the entire WECC network and consists of the detailed representation of the CAISO control grid and a simplified representation of the WECC (Western Electricity Coordinating Council) bulk power system. Creating

  2. Physical Impacts of Climate Change on the Western US Electricity System: A Scoping Study

    E-Print Network [OSTI]

    Coughlin, Katie

    2008-01-01T23:59:59.000Z

    into actual modeling exercises. Electric System Planningelectric system planners and scientists engaged in climate impacts modelingelectric system planners to use climate data in their modeling

  3. Multidimensional Geometrical Model of the Renormalized Electrical Charge with Splitting off the Extra Coordinates

    E-Print Network [OSTI]

    V. Dzhunushaliev

    1998-07-29T23:59:59.000Z

    A geometrical model of electric charge is proposed. This model has ``naked'' charge screened with a ``fur - coat'' consisting of virtual wormholes. The 5D wormhole solution in the Kaluza - Klein theory is the ``naked'' charge. The splitting off of the 5D dimension happens on the two spheres (null surfaces) bounding this 5D wormhole. This allows one to sew two Reissner - Nordstr\\"om black holes onto it on both sides. The virtual wormholes entrap a part of the electrical flux lines coming into the ``naked'' charge. This effect essentially changes the charge visible at infinity so that it satisfies the real relation $m^2

  4. Office of Inspector General report on audit of the Western Area Power Administration`s contract with Basin Electric Power Cooperative

    SciTech Connect (OSTI)

    NONE

    1997-06-25T23:59:59.000Z

    At the request of the Western Area Power Administration (Western), an audit of 17 areas was conducted with respect to possible overcharges on a power contract between Western and Basin Electric Power Cooperative (Basin), Contract No. DE-MP65-82WP-19001. The contract for Western`s purchase of electric power from Basin was entered into on April 15, 1982, and was in effect from January 1, 1986, through October 31, 1990. During this 58-month period, Basin billed Western approximately $197.6 million. Overall, it was found that Basin overcharged Western approximately $23.8 million. These overcharges occurred because Basin: (1) did not recognize or amortize as gain its overestimate of completion and correction costs for Antelope Valley Station (AVS) Unit 2; (2) did not amortize the gain on the sale/leaseback of AVS Unit 2 as an offset to lease costs; (3) billed Western prematurely for lease and interest costs; (4) overcharged for the cost of coal by including administrative and general expenses and profit, as well as incorrectly calculating discounts, royalty payments, and imputed interest costs; (5) made faulty calculations of amortization rates for deferred costs; (6) used a shorter depreciation period for AVS common facilities than it had used for other power plants; (7) retained tax benefit transfers; and (8) charged Western for interest and depreciation that had been paid by others. In addition to the $23.8 million in overcharges, interest accrued on the overcharges through December 31, 1996 was estimated to be approximately $22.1 million, resulting in a total of $45.9 million due Western.

  5. Integrated Energy-Water Planning in the Western and Texas Interconnections

    SciTech Connect (OSTI)

    Vincent Tidwell; John Gasper; Robert Goldstein; Jordan Macknick; Gerald Sehlke; Michael Webber; Mark Wigmosta

    2013-07-01T23:59:59.000Z

    While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, and reliability, issues concerning the availability of water represent an emerging issue. Thermoelectric expansion must be considered in the context of competing demands from other water use sectors balanced with fresh and non-fresh water supplies subject to climate variability. An integrated Energy-Water Decision Support System (DSS) is being developed that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water availability and cost for long-range transmission planning. The project brings together electric transmission planners (Western Electricity Coordinating Council and Electric Reliability Council of Texas) with western water planners (Western Governors’ Association and the Western States Water Council). This paper lays out the basic framework for this integrated Energy-Water DSS.

  6. Energy and water in the Western and Texas interconnects.

    SciTech Connect (OSTI)

    Tidwell, Vincent Carroll

    2010-08-01T23:59:59.000Z

    The Department of Energy's Office of Electricity has initiated a $60M program to assist the electric industry in interconnection-level analysis and planning. The objective of this effort is to facilitate the development or strengthening of capabilities in each of the three interconnections serving the lower 48 states of the United States, to prepare analyses of transmission requirements under a broad range of alternative futures and develop long-term interconnection-wide transmission expansion plans. The interconnections are the Western Interconnection, the Eastern Interconnection, and the Texas Interconnection. One element of this program address the support and development of an integrated energy-water Decision Support System (DSS) that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water stress for transmission and resource planning (the Eastern Interconnection is not participating in this element). Specific objectives include: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between members of this proposal team and the Western Electricity Coordinating Council (WECC), Western Governors Association (WGA), the Electric Reliability Council of Texas (ERCOT) and their associated stakeholder teams. (3) Exercise the Energy-Water DSS to investigate water stress implications of the transmission planning scenarios put forward by WECC, WGA, and ERCOT. The goals of this project are: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between Western Electricity Coordinating Council, Electric Reliability Council of Texas, Western Governors Association, and Western States Water Council. (3) Exercise the Energy-Water DSS to investigate water transmission planning scenarios.

  7. Dynamic Interactions in the Western United States Electricity Spot Markets Christine A. Jerko

    E-Print Network [OSTI]

    by a highly interconnected transmission system and established trading regime (De Vany and Walls, 1999b this new world." Most studies of electricity pricing have investigated market structure and power, reasons), in examining spot markets in England and Wales and the Nordic countries, notes there is significant differences

  8. Geothermal energy in the western United States and Hawaii: Resources and projected electricity generation supplies. [Contains glossary and address list of geothermal project developers and owners

    SciTech Connect (OSTI)

    Not Available

    1991-09-01T23:59:59.000Z

    Geothermal energy comes from the internal heat of the Earth, and has been continuously exploited for the production of electricity in the United States since 1960. Currently, geothermal power is one of the ready-to-use baseload electricity generating technologies that is competing in the western United States with fossil fuel, nuclear and hydroelectric generation technologies to provide utilities and their customers with a reliable and economic source of electric power. Furthermore, the development of domestic geothermal resources, as an alternative to fossil fuel combustion technologies, has a number of associated environmental benefits. This report serves two functions. First, it provides a description of geothermal technology and a progress report on the commercial status of geothermal electric power generation. Second, it addresses the question of how much electricity might be competitively produced from the geothermal resource base. 19 figs., 15 tabs.

  9. Analysis of Critical Permeabilty, Capillary Pressure and Electrical Properties for Mesaverde Tight Gas Sandstones from Western U.S. Basins

    SciTech Connect (OSTI)

    Alan Byrnes; Robert Cluff; John Webb; John Victorine; Ken Stalder; Daniel Osburn; Andrew Knoderer; Owen Metheny; Troy Hommertzheim; Joshua Byrnes; Daniel Krygowski; Stefani Whittaker

    2008-06-30T23:59:59.000Z

    Although prediction of future natural gas supply is complicated by uncertainty in such variables as demand, liquefied natural gas supply price and availability, coalbed methane and gas shale development rate, and pipeline availability, all U.S. Energy Information Administration gas supply estimates to date have predicted that Unconventional gas sources will be the dominant source of U.S. natural gas supply for at least the next two decades (Fig. 1.1; the period of estimation). Among the Unconventional gas supply sources, Tight Gas Sandstones (TGS) will represent 50-70% of the Unconventional gas supply in this time period (Fig. 1.2). Rocky Mountain TGS are estimated to be approximately 70% of the total TGS resource base (USEIA, 2005) and the Mesaverde Group (Mesaverde) sandstones represent the principal gas productive sandstone unit in the largest Western U.S. TGS basins including the basins that are the focus of this study (Washakie, Uinta, Piceance, northern Greater Green River, Wind River, Powder River). Industry assessment of the regional gas resource, projection of future gas supply, and exploration programs require an understanding of reservoir properties and accurate tools for formation evaluation. The goal of this study is to provide petrophysical formation evaluation tools related to relative permeability, capillary pressure, electrical properties and algorithms for wireline log analysis. Detailed and accurate moveable gas-in-place resource assessment is most critical in marginal gas plays and there is need for quantitative tools for definition of limits on gas producibility due to technology and rock physics and for defining water saturation. The results of this study address fundamental questions concerning: (1) gas storage; (2) gas flow; (3) capillary pressure; (4) electrical properties; (5) facies and upscaling issues; (6) wireline log interpretation algorithms; and (7) providing a web-accessible database of advanced rock properties. The following text briefly discusses the nature of these questions. Section I.2 briefly discusses the objective of the study with respect to the problems reviewed.

  10. Examination of Potential Benefits of an Energy Imbalance Market in the Western Interconnection

    SciTech Connect (OSTI)

    Milligan, M.; Clark, K.; King, J.; Kirby, B.; Guo, T.; Liu, G.

    2013-03-01T23:59:59.000Z

    In the Western Interconnection, there is significant interest in improving approaches to wide-area coordinated operations of the bulk electric power system, in part because of the increasing penetration of variable generation. One proposed solution is an energy imbalance market. This study focused on that approach alone, with the goal of identifying the potential benefits of an energy imbalance market in the year 2020.

  11. Analysis of Cycling Costs in Western Wind and Solar Integration Study

    SciTech Connect (OSTI)

    Jordan, G.; Venkataraman, S.

    2012-06-01T23:59:59.000Z

    The Western Wind and Solar Integration Study (WWSIS) examined the impact of up to 30% penetration of variable renewable generation on the Western Electricity Coordinating Council system. Although start-up costs and higher operating costs because of part-load operation of thermal generators were included in the analysis, further investigation of additional costs associated with thermal unit cycling was deemed worthwhile. These additional cycling costs can be attributed to increases in capital as well as operations and maintenance costs because of wear and tear associated with increased unit cycling. This analysis examines the additional cycling costs of the thermal fleet by leveraging the results of WWSIS Phase 1 study.

  12. Development of a Hydrogasification Process for Co-Production of Substitute Natural Gas (SNG) and Electric Power from Western Coals

    SciTech Connect (OSTI)

    Sun, Xiaolei; Rink, Nancy

    2011-04-30T23:59:59.000Z

    This report presents the results of the research and development conducted on an Advanced Hydrogasification Process (AHP) conceived and developed by Arizona Public Service Company (APS) under U.S. Department of Energy (DOE) contract: DE-FC26-06NT42759 for Substitute Natural Gas (SNG) production from western coal. A double-wall (i.e., a hydrogasification contained within a pressure shell) down-flow hydrogasification reactor was designed, engineered, constructed, commissioned and operated by APS, Phoenix, AZ. The reactor is ASME-certified under Section VIII with a rating of 1150 pounds per square inch gage (psig) maximum allowable working pressure at 1950 degrees Fahrenheit ({degrees}F). The reaction zone had a 1.75 inch inner diameter and 13 feet length. The initial testing of a sub-bituminous coal demonstrated ~ 50% carbon conversion and ~10% methane yield in the product gas under 1625{degrees}F, 1000 psig pressure, with a 11 seconds (s) residence time, and 0.4 hydrogen-to-coal mass ratio. Liquid by-products mainly contained Benzene, Toluene, Xylene (BTX) and tar. Char collected from the bottom of the reactor had 9000-British thermal units per pound (Btu/lb) heating value. A three-dimensional (3D) computational fluid dynamic model simulation of the hydrodynamics around the reactor head was utilized to design the nozzles for injecting the hydrogen into the gasifier to optimize gas-solid mixing to achieve improved carbon conversion. The report also presents the evaluation of using algae for carbon dioxide (CO{sub 2}) management and biofuel production. Nannochloropsis, Selenastrum and Scenedesmus were determined to be the best algae strains for the project purpose and were studied in an outdoor system which included a 6-meter (6M) radius cultivator with a total surface area of 113 square meters (m{sup 2}) and a total culture volume between 10,000 to 15,000 liters (L); a CO{sub 2} on-demand feeding system; an on-line data collection system for temperature, pH, Photosynthetically Activate Radiation (PAR) and dissolved oxygen (DO); and a ~2 gallons per minute (gpm) algae culture dewatering system. Among the three algae strains, Scenedesmus showed the most tolerance to temperature and irradiance conditions in Phoenix and the best self-settling characteristics. Experimental findings and operational strategies determined through these tests guided the operation of the algae cultivation system for the scale-up study. Effect of power plant flue gas, especially heavy metals, on algae growth and biomass adsorption were evaluated as well.

  13. Western Area Power Administration Transmission Infrastructure...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Expected to Borrow Next WHAT IS WESTERN? * Power Marketing Administration under DOE * Wholesale electricity supplier, 57 hydropower plants, 10,479 MW capacity * 682 long-termfirm...

  14. ELECTRIC

    Office of Legacy Management (LM)

    you nay give us will be greatly uppreckted. VPry truly your23, 9. IX. Sin0j3, Mtinager lclectronics and Nuclear Physics Dept. omh , WESTINGHOUSE-THE NAT KING IN ELECTRICITY...

  15. Operating Reserve Implication of Alternative Implementations of an Energy Imbalance Service on Wind Integration in the Western Interconnection: Preprint

    SciTech Connect (OSTI)

    Milligan, M.; Kirby, B.; King, J.; Beuning, S.

    2011-07-01T23:59:59.000Z

    During the past few years, there has been significant interest in alternative ways to manage power systems over a larger effective electrical footprint. Large regional transmission organizations in the Eastern Interconnection have effectively consolidated balancing areas, achieving significant economies of scale that result in a reduction in required reserves. Conversely, in the Western Interconnection there are many balancing areas, which will result in challenges if there is significant wind and solar energy development in the region. A recent proposal to the Western Electricity Coordinating Council suggests a regional energy imbalance service (EIS). To evaluate this EIS, a number of analyses are in process or are planned. This paper describes one part of an analysis of the EIS's implication on operating reserves under several alternative scenarios of the market footprint and participation. We improve on the operating reserves method utilized in the Eastern Wind Integration and Transmission Study and apply this modified approach to data from the Western Wind and Solar Integration Study.

  16. Development of a Hydrogasification Process for Co-Production of Substitute Natural Gas (SNG) and Electric Power from Western Coals-Phase I

    SciTech Connect (OSTI)

    Raymond Hobbs

    2007-05-31T23:59:59.000Z

    The Advanced Hydrogasification Process (AHP)--conversion of coal to methane--is being developed through NETL with a DOE Grant and has successfully completed its first phase of development. The results so far are encouraging and have led to commitment by DOE/NETL to begin a second phase--bench scale reactor vessel testing, expanded engineering analysis and economic perspective review. During the next decade new means of generating electricity, and other forms of energy, will be introduced. The members of the AHP Team envision a need for expanded sources of natural gas or substitutes for natural gas, to fuel power generating plants. The initial work the team has completed on a process to use hydrogen to convert coal to methane (pipeline ready gas) shows promising potential. The Team has intentionally slanted its efforts toward the needs of US electric utilities, particularly on fuels that can be used near urban centers where the greatest need for new electric generation is found. The process, as it has evolved, would produce methane from coal by adding hydrogen. The process appears to be efficient using western coals for conversion to a highly sought after fuel with significantly reduced CO{sub 2} emissions. Utilities have a natural interest in the preservation of their industry, which will require a dramatic reduction in stack emissions and an increase in sustainable technologies. Utilities tend to rank long-term stable supplies of fuel higher than most industries and are willing to trade some ratio of cost for stability. The need for sustainability, stability and environmentally compatible production are key drivers in the formation and progression of the AHP development. In Phase II, the team will add a focus on water conservation to determine how the basic gasification process can be best integrated with all the plant components to minimize water consumption during SNG production. The process allows for several CO{sub 2} reduction options including consumption of the CO{sub 2} in the original process as converted to methane. The process could under another option avoid emissions following the conversion to SNG through an adjunct algae conversion process. The algae would then be converted to fuels or other products. An additional application of the algae process at the end use natural gas fired plant could further reduce emissions. The APS team fully recognizes the competition facing the process from natural gas and imported liquid natural gas. While we expect those resources to set the price for methane in the near-term, the team's work to date indicates that the AHP process can be commercially competitive, with the added benefit of assuring long-term energy supplies from North American resources. Conversion of coal to a more readily transportable fuel that can be employed near load centers with an overall reduction of greenhouses gases is edging closer to reality.

  17. An Examination of Temporal Trends in Electricity Reliability Based on Reports from U.S. Electric Utilities

    E-Print Network [OSTI]

    Eto, Joseph H.

    2013-01-01T23:59:59.000Z

    SAIDI SAIFI SERC SPP TRE WECC Alaska Systems CoordinatingElectricity Coordinating Council (WECC) Midwest ReliabilityCoordinating Council (WECC). Completeness of reported

  18. How Western Does Business: An Explanation of Western's Products and Services

    SciTech Connect (OSTI)

    none,

    2012-10-01T23:59:59.000Z

    The mission of the Western Area Power Administration is to market and deliver reliable, renewable, cost-based hydroelectric power and related services. This guide provides an overview of Western’s history and how Western carries out that mission and provides electrical, transmission and ancillary services. It also discusses how we develop plans for marketing our most valuable resources—long-term firm capacity and energy.

  19. Power systems simulations of the western United States region.

    SciTech Connect (OSTI)

    Conzelmann, G.; Koritarov, V.; Poch, L.; Thimmapuram, P.; Veselka, T.; Decision and Information Sciences

    2010-03-15T23:59:59.000Z

    This report documents a part of a broad assessment of energy-water-related issues in the western United States. The full analysis involved three Department of Energy national laboratories: Argonne National Laboratory, Los Alamos National Laboratory, and Sandia National Laboratories. Argonne's objective in the overall project was to develop a regional power sector expansion forecast and a detailed unit-level operational (dispatch) analysis. With these two major analysis components, Argonne estimated current and future freshwater withdrawals and consumption related to the operation of U.S. thermal-electric power plants in the Western Electricity Coordinating Council (WECC) region for the period 2005-2025. Water is withdrawn and used primarily for cooling but also for environmental control, such as sulfur scrubbers. The current scope of the analysis included three scenarios: (1) Baseline scenario as a benchmark for assessing the adequacy and cost-effectiveness of water conservation options and strategies, (2) High nuclear scenario, and (3) High renewables scenario. Baseline projections are consistent with forecasts made by the WECC and the Energy Information Administration (EIA) in its Annual Energy Outlook (AEO) (EIA 2006a). Water conservation scenarios are currently limited to two development alternatives that focus heavily on constructing new generating facilities with zero water consumption. These technologies include wind farms and nuclear power plants with dry cooling. Additional water conservation scenarios and estimates of water use associated with fuel or resource extraction and processing will be developed in follow-on analyses.

  20. Regional Summary Western Pacific Management Context

    E-Print Network [OSTI]

    .5 million pounds) of the Pacific-wide (western-central and eastern Pacific Ocean) total of Pacific bigeye Ocean and the Inter-American Tropical Tuna Commission (IATTC) is active in the eastern Pacific Ocean coordinated management between countries with fishing interests in the Pacific Ocean. The annual bigeye tuna

  1. Focus Sensitive Coordination

    E-Print Network [OSTI]

    Hulsey, Sarah McNearney

    2008-01-01T23:59:59.000Z

    This thesis investigates the role of the Focus Sensitive Operators (FSOs) even and also when found inside of a coordination. Coordinations of this form are called Focus Sensitive Coordinations (FSC) and include or even, ...

  2. Class 1 overview of cultural resources for the Western Area Power Administration Salt Lake City Area Integrated Projects electric power marketing environmental impact statement

    SciTech Connect (OSTI)

    Moeller, K.L.; Malinowski, L.M.; Hoffecker, J.F.; Walitschek, D.A.; Shogren, L.; Mathews, J.E.; Verhaaren, B.T.

    1993-11-01T23:59:59.000Z

    Argonne National Laboratory conducted an inventory of known archaeological and historic sites in areas that could be affected by the hydropower operation alternatives under analysis in the power marketing environmental impact statement for the Western Area Power Administration`s Salt Lake City Area Integrated Projects. The study areas included portions of the Green River (Flaming Gorge Dam to Cub Creek) in Utah and Colorado and the Gunnison River (Blue Mesa Reservoir to Crystal Dam) in Colorado. All previous archaeological surveys and previously recorded prehistoric and historic sites, structures, and features were inventoried and plotted on maps (only survey area maps are included in this report). The surveys were classified by their level of intensity, and the sites were classified according to their age, type, and contents. These data (presented here in tabular form) permit a general assessment of the character and distribution of archaeological remains in the study areas, as well as an indication of the sampling basis for such an assessment. To provide an adequate context for the descriptions of the archaeological and historic sites, this report also presents overviews of the environmental setting and the regional prehistory, history, and ethnography for each study area.

  3. Western Meter Policy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    as Western) VAC Voltage Alternating Current VAR, Mvar Volt-Ampere-Reactive (Instantaneous Reactive Power), Mega-Var VDC Voltage Direct Current Western Area Power Administration...

  4. Effects of Temporal Wind Patterns on the Value of Wind-Generated Electricity in California and the Northwest

    E-Print Network [OSTI]

    Wiser, Ryan H

    2008-01-01T23:59:59.000Z

    Laboratory, private communi- cation, March 12, 2004. WECC, "WECC 2006 Power Supply Assessment," Western Electricity

  5. U.S. Department of Energy Electricity Advisory Committee Meeting

    Broader source: Energy.gov (indexed) [DOE]

    Hoffman Office of Electricity Holmes Hummel Department of Energy Larry Mansueti Office of Energy Mike McElhany Western Area Power Administration David Meyer Office of Electricity 3...

  6. Career Map: Instrumentation Coordinator

    Broader source: Energy.gov [DOE]

    The Wind Program's Career Map provides job description information for Instrumentation Coordinator positions.

  7. Renewable Electricity Futures (Presentation)

    SciTech Connect (OSTI)

    Hand, M. M.

    2012-08-01T23:59:59.000Z

    This presentation library summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. It was presented to the 2012 Western Conference of Public Service Commissioners, during their June, 2012, meeting. The Western Conference of Public Service Commissioners is a regional association within the National Association of Regulatory Utility Commissioners (NARUC).

  8. Western Region Renewable Energy Markets: Implications for the Bureau of Land Management

    SciTech Connect (OSTI)

    Haase, S.; Billman, L.; Gelman, R.

    2012-01-01T23:59:59.000Z

    The purpose of this analysis is to provide the U.S. Department of the Interior (DOI) and the Bureau of Land Management (BLM) with an overview of renewable energy (RE) generation markets, transmission planning efforts, and the ongoing role of the BLM RE projects in the electricity markets of the 11 states (Arizona, California, Colorado, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, and Wyoming) that comprise the Western Electricity Coordinating Council (WECC) Region. This analysis focuses on the status of, and projections for, likely development of non-hydroelectric renewable electricity from solar (including photovoltaic [PV] and concentrating solar power [CSP]), wind, biomass and geothermal resources in these states. Absent new policy drivers and without the extension of the DOE loan guarantee program and Treasury's 1603 program, state RPS requirements are likely to remain a primary driver for new RE deployment in the western United States. Assuming no additional policy incentives are implemented, projected RE demand for the WECC states by 2020 is 134,000 GWh. Installed capacity to meet that demand will need to be within the range of 28,000-46,000 MW.

  9. COORDINATORS Coordination Managers for First Responders

    E-Print Network [OSTI]

    Wagner, Thomas

    Guralnik Ryan VanRiper Honeywell Laboratories Tom.Wagner@honeywell.com Abstract COORDINATORs) and the Air Force Research Laboratory (AFRL) under agree- ment number F30602-03-C-0010 and by Honeywell or Honeywell Interna- tional. Figure 1. A Single COORDINATOR Running on an Off-The-Shelf Wireless PDA helping

  10. RTG resource book for western states and provinces: Final proceedings

    SciTech Connect (OSTI)

    NONE

    1994-12-31T23:59:59.000Z

    The Western Interstate Energy Board held a workshop and liaison activities among western states, provinces, and utilities on the formation of Regional Transmission Groups (RTGs). Purpose of the activities was to examine the policy implications for western states and provinces in the formation of RTGs in the West, the implications for western ratepayers and utilities of the RTG formation and potential impacts of RTGs on the western electricity system. The workshop contributed to fulfilling the transmission access and competition objectives of Title VII of the Energy Policy Act of 1992.

  11. Coordinating Interstate Electric Transmission Siting: An Introduction...

    Open Energy Info (EERE)

    the near future. While improved demand-side management (including energy effi ciency and demand response), bett er utilization of the existing transmission grid, and other...

  12. Coordination of Federal Authorizations for Electric Transmission

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S. DepartmentEnergy This partAsAmanda McAlpin So you'veDepartment ofDebate

  13. Hand Eye Coordination

    E-Print Network [OSTI]

    Speckert, Glen

    This paper describes a simple method of converting visual coordinates to arm coordinates which does not require knowledge of the position of the camera(s). Comparisons are made to other methods and two camera, three ...

  14. Energy Department Partners with EU on Electric Vehicle and Smart...

    Office of Environmental Management (EM)

    Partners with EU on Electric Vehicle and Smart Grid Coordination Energy Department Partners with EU on Electric Vehicle and Smart Grid Coordination July 19, 2013 - 5:17pm Addthis...

  15. AREA COORDINATOR RESIDENTIAL EDUCATION

    E-Print Network [OSTI]

    Bordenstein, Seth

    AREA COORDINATOR RESIDENTIAL EDUCATION VANDERBILT UNIVERSITY, NASHVILLE, TENNESSEE The Office of Housing and Residential Education at Vanderbilt University is seeking applicants for an Area Coordinator. The Area Coordinator is responsible for assisting in the management and operation of a residential area

  16. Western Pacific Regional Summary Western Pacific

    E-Print Network [OSTI]

    ) of the Pacific-wide (western-central and eastern Pacific Ocean) total of Pacific bigeye tuna landings reported Fisheries Commission (WCPFC) is active in the western and central Pacific Ocean and the Inter-American Tropical Tuna Commission (IATTC) is active in the eastern Pacific Ocean. Species under the purview

  17. EIS-0386: Designation of Energy Corridors on Federal Land in Western States

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's decision to designatate corridors on Federal land in the eleven Western States for oil, gas and hydrogen pipelines and electricity transmission and distribution facilities.

  18. WESTERN MONTANA ELECTRIC GENERATING & TRANSMISSION COOPERATIVE, INC.

    E-Print Network [OSTI]

    Technical Forum," prepared by Energy Market Innovations (EMI), Inc. and Navigant Consulting, contains to the attainment of energy efficiency goals for the region. This report also notes, however, that the current is prioritized. Assuming there will be additional demands placed on the RTF, issues of adequacy of funding

  19. Compact-range coordinate system established using a laser tracker.

    SciTech Connect (OSTI)

    Gallegos, Floyd H.; Bryce, Edwin Anthony

    2006-12-01T23:59:59.000Z

    Establishing a Cartesian coordinate reference system for an existing Compact Antenna Range using the parabolic reflector is presented. A SMX (Spatial Metrix Corporation) M/N 4000 laser-based coordinate measuring system established absolute coordinates for the facility. Electric field characteristics with positional movement correction are evaluated. Feed Horn relocation for alignment with the reflector axis is also described. Reference points are established for follow-on non-laser alignments utilizing a theodolite.

  20. Coordinators Help Site

    E-Print Network [OSTI]

    Everything is done electronically using e-mail notification and simple web-based tools. As a Coordinator your principal activity will be to screen eprints submitted ...

  1. Evaluation of Production Cost Savings from Consolidation of Balancing Authorities in the US Western Interconnection under High Wind and Solar Penetration

    SciTech Connect (OSTI)

    Nguyen, Tony B.; Samaan, Nader A.; Jin, Chunlian

    2014-12-24T23:59:59.000Z

    This paper introduces a comprehensive analysis to quantify the potential savings in production cost due to consolidation of 32 US western interconnection Balancing Authorities (BAs). Three simulation scenarios are developed: current Western Electricity Coordinating Council (WECC) BAs structure, full copper-sheet consolidation, and full consolidation with transmission congestion considered. The study uses WECC Transmission Expansion Planning Policy Committee (TEPPC) model that was developed for the year 2020. The model assumes 8% wind and 3% solar energy penetration as percentage of total WECC demand in 2020. Sensitivity analyses are carried out to assess the impact of transmission hurdle rates between WECC BAs on potential benefits. The study shows savings that ranges from $400 Million (2.4% of total one year production cost) to $600 Million (3.2%) per year in thermal units production cost due to consolidation can be achieved. The copper sheet consolidation scenario shows an extra savings of $240 Million (1.4%) per year.

  2. Final Report on Transmission Pricing in the Western Interconnection

    SciTech Connect (OSTI)

    Douglas C. Larson; Lawrence Nordell

    2003-06-25T23:59:59.000Z

    Under this project, the Committee on Regional Electric Power Cooperation (CREPC) of the Western Interstate Energy Board developed a ''western pricing and congestion management proposal'' in order to foster efficient wholesale power markets and efficient use and expansion of the transmission grid. Drafts of this paper provided useful information to states/provinces in the Western Interconnection as Western Regional Transmission Organization (RTO) transmission pricing proposals have continued to evolve. Throughout the project there has been a gradual, but incomplete agreement on pricing systems to be used by RTOs in the West.

  3. Western Area Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    29-30, 2011 2 Agenda * Overview of Western Area Power Administration * Post-1989 Loveland Area Projects (LAP) Marketing Plan * Energy Planning and Management Program * Development...

  4. CEMI Western Regional Summit

    Broader source: Energy.gov [DOE]

    Please Join Assistant Secretary of Energy Dr. David Danielson for the Clean Energy Manufacturing Initiative's Western Regional Summit. Register now for this free event.

  5. Track Co-ordinators Guide Track Co-ordinators Guide

    E-Print Network [OSTI]

    Track Co-ordinators Guide CERN #12;Track Co-ordinators Guide by CERN #12;Table of Contents 1. Track Co-ordinators Guide ..................................................................................................................1 1.1. Track Co

  6. Session Co-ordinator's Session Co-ordinator's Guide

    E-Print Network [OSTI]

    Session Co-ordinator's Guide CERN #12;Session Co-ordinator's Guide by CERN #12;Table of Contents 1. Session Co-ordinators Guide ................................................................................................................1 1.1. Session Co

  7. Western Pacific Regional Summary Western Pacific

    E-Print Network [OSTI]

    Pacific Ocean) total of Pacific bigeye tuna landings reported in 2007. Currently, there are no catch share in the western and central Pacific Ocean and the Inter-American Tropical Tuna Commission (IATTC) is active in the eastern Pacific Ocean. Species under the purview of the WCPFC and IATTC migrate across international

  8. Western Pacific Regional Summary Western Pacific

    E-Print Network [OSTI]

    -central and eastern Pacific Ocean) total of Pacific bigeye tuna landings reported in 2007. Currently (WCPFC) is active in the western and central Pacific Ocean and the Inter-American Tropical Tuna Commission (IATTC) is active in the eastern Pacific Ocean. Species under the purview of the WCPFC and IATTC

  9. Assessing Vehicle Electricity Demand Impacts on California Electricity Supply

    E-Print Network [OSTI]

    McCarthy, Ryan W.

    2009-01-01T23:59:59.000Z

    System Operator. WECC (2006) Information Summary, Westernx SDG&E SMR SMUD TID v VMT WECC San Diego Gas & ElectricCoordinating Council (WECC) differ somewhat from the CEC and

  10. Regional Transportation Coordination Study

    E-Print Network [OSTI]

    Golden Crescent Regional Planning Commission

    Committee for this study. ? Develop a coordination public transportation plan ? Identify resources required to develop the plan ? Provide policy guidance to lead the planning and coordination effort Golden Crescent Regional Transit 1... of Texas. This resource will be relied upon for further development of the Intermodal Transportation Terminal. ? FTA Section 5309 (Bus) Discretionary Support ? To assist in meeting the GCRPC?s capital replacement needs. This resource...

  11. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    ................................................................. 1 1.0 Western Electricity Coordinating Council (WECC) WAMS (Wide Area Measurement System

  12. Coordinating and promoting effective

    E-Print Network [OSTI]

    1 I Coordinating and promoting effective protection and restoration of fish, wildlife Nation Idaho Department of Fish and Game Kootenai Tribe of Idaho Montana Department of Fish, Wildlife and Parks National Marine Fisheries Service Nez Perce Tribe Oregon Department of Fish and Wildlife Shoshone

  13. Environmental Compliance Issue Coordination

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1993-01-07T23:59:59.000Z

    To establish the Department of Energy (DOE) requirements for coordination of significant environmental compliance issues to ensure timely development and consistent application of Departmental environmental policy and guidance. Cancels DOE O 5400.2. Para. 5a(2) and 5a(7) canceled by DOE O 231.1.

  14. Block coordination copolymers

    DOE Patents [OSTI]

    Koh, Kyoung Moo; Wong-Foy, Antek G; Matzger, Adam J; Benin, Annabelle I; Willis, Richard R

    2014-11-11T23:59:59.000Z

    The present invention provides compositions of crystalline coordination copolymers wherein multiple organic molecules are assembled to produce porous framework materials with layered or core-shell structures. These materials are synthesized by sequential growth techniques such as the seed growth technique. In addition, the invention provides a simple procedure for controlling functionality.

  15. Block coordination copolymers

    DOE Patents [OSTI]

    Koh, Kyoung Moo; Wong-Foy, Antek G.; Matzger, Adam J.; Benin, Annabelle I.; Willis, Richard R.

    2012-12-04T23:59:59.000Z

    The present invention provides compositions of crystalline coordination copolymers wherein multiple organic molecules are assembled to produce porous framework materials with layered or core-shell structures. These materials are synthesized by sequential growth techniques such as the seed growth technique. In addition, the invention provides a simple procedure for controlling functionality.

  16. Block coordination copolymers

    DOE Patents [OSTI]

    Koh, Kyoung Moo; Wong-Foy, Antek G; Matzger, Adam J; Benin, Annabelle I; Willis, Richard R

    2012-11-13T23:59:59.000Z

    The present invention provides compositions of crystalline coordination copolymers wherein multiple organic molecules are assembled to produce porous framework materials with layered or core-shell structures. These materials are synthesized by sequential growth techniques such as the seed growth technique. In addition, the invention provides a simple procedure for controlling functionality.

  17. Energy Efficiency in Western Utility Resource Plans: Impacts onRegional Resources Assessment and Support for WGA Policies

    SciTech Connect (OSTI)

    Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

    2006-08-01T23:59:59.000Z

    In the aftermath of the consumer price shocks and short-term power shortages of the 2000-01 electricity crisis, policymakers and regulators in Western states are placing increased emphasis on integrated resource planning (IRP), resource adequacy and assessment and a diversified portfolio of resources to meet the needs of electricity consumers. In some states, this has led to a resurgence in state and utility commitments to energy efficiency. Increasing interest in acquiring energy efficiency as a power-system resource is also driven by the desire to dampen high growth rates in electricity demand in some Western states, rapid increases in natural gas prices, concerns about the environmental impacts of electricity generation (e.g. water consumption by power plants, air quality), and the potential of energy efficiency to provide utility bill savings for households and businesses (WGA CDEAC 2006). Recognizing the cost-competitiveness and environmental benefits of energy efficiency, the Western Governor's Association (WGA) has set a high priority for energy efficiency, establishing a goal of reducing projected electricity demand by 20% across the West by 2020 in a policy resolution on Clean and Diversified Energy for the West (WGA 2004). Nationally, the need for improved tracking of demand-side resources in load forecasting is formalized in the North American Electric Reliability Council (NERC)'s recently adopted reliability standards, which utilities and regional reliability organizations will need to comply with (NERC 2005a and 2005b). In this study, we examine the treatment of energy efficiency in recent resource plans issued by fourteen investor-owned utilities (IOUs) in the Western United States and Canada. The goals of this study are to: (1) summarize energy-efficiency resources as represented in a large sample of recent resource plans prepared by Western utilities and identify key issues; (2) evaluate the extent to which the information provided in current resource plans can be used to support region-wide resource assessment and tracking of state/utility progress in meeting the WGA's energy-efficiency goals (WGA 2004); and (3) offer recommendations on information and documentation of energy-efficiency resources that should be included in future resource plans to facilitate comparative review and regional coordination. The scope of this report covers projected electric end-use efficiency investments reported in all Western utility resource plans that were publicly available as of February 2006. While a few utilities included additional demand-side resources, such as demand response, in their plans, we do not report that information. However, many of the issues and recommendations in reference to energy efficiency in this report are relevant to other demand-side resources as well. This report is organized as follows. Section 2 outlines the data sources and approach used in this study and conceptualizes methods and metrics for tracking energy-efficiency resources over time. Section 3 presents results from the review of the utility resource plans. Important issues encountered in reviewing the resource plans are discussed in section 4. Finally, section 5 concludes with recommendations for improving the tracking and reporting of energy efficiency in forthcoming resource plans.

  18. Electric Load Forecasting

    E-Print Network [OSTI]

    -commitment, coordination, and interchange evaluation. In addition, the liberalization of electric energy markets worldwide has led to the development of energy exchanges where consumers, 1066-033X/07/$25.00©2007IEEE OCTOBER/GODDARD SPACE FLIGHT CENTER SCIENTIFIC VISUALIZATION STUDIO Authorized licensed use limited to: Katholieke

  19. Benefit of Regional Energy Balancing Service on Wind Integration in the Western Interconnection of the United States

    SciTech Connect (OSTI)

    Milligan, M.; Kirby, B.; King, J.; Beuning, S.

    2010-01-01T23:59:59.000Z

    Interest in various wide-area balancing schemes to help integrate wind have generated significant interest. As we have shown in past work, large balancing areas not only help with wind integration, but can also increase the efficiency of operations in systems without wind. Recent work on the Western Wind and Solar Integration Study (WWSIS) has found that combining balancing over the WestConnect footprint will increase the efficiency of commitment and dispatch at wind penetrations ranging from 10-20% of annual electricity demand, and will be essential for high penetrations and small balancing areas. In addition the Northwest Wind Integration Action Plan recommended balancing area cooperation as a method to help integrate the large potential wind development. In this paper we investigate the potential impact of a proposed Energy Imbalance Service on the ability of the non-market portions of Western Electricity Coordinating Councils (WECC) United States footprint to integrate wind energy. We will utilize data adapted from the WWSIS for the Western Interconnection. The analysis uses time-synchronized wind and load data to evaluate the potential for ramp requirement reduction that could be achieved with combined operation. Chronological analysis and ramp duration analysis quantify the benefit in terms of not only the ramp sizes, but the frequency of the potentially avoided ramps that must be managed by the non-wind generation fleet. Multiple approaches that can be used to achieve these benefits will also be suggested in the paper. We also suggest other approaches that can help achieve much of the benefit of full consolidation without requiring the physical consolidation of balancing areas.

  20. AFTER A Framework for electrical power sysTems vulnerability...

    Open Energy Info (EERE)

    Ireland) Jump to: navigation, search Project Name AFTER A Framework for electrical power sysTems vulnerability identification, dEfense and Restoration Country Ireland Coordinates...

  1. AFTER A Framework for electrical power sysTems vulnerability...

    Open Energy Info (EERE)

    Belgium) Jump to: navigation, search Project Name AFTER A Framework for electrical power sysTems vulnerability identification, dEfense and Restoration Country Belgium Coordinates...

  2. Student Leadership Program Coordinator Application

    E-Print Network [OSTI]

    Sheridan, Jennifer

    Student Leadership Program Coordinator Application Summer 2012 ­ Spring 2013 Please direct all (Preferable Start Date 7/1) ____ Leadership Events and Training Program Coordinator (Preferable Start Date 7 leadership skills do you hope to strengthen from a Student Leadership Program Coordinator position? 2

  3. Proposed changes to generating capacity 1980-1989 for the contiguous United States: as projected by the Regional Electric Reliability Councils in their April 1, 1980 long-range coordinated planning reports to the Department of Energy

    SciTech Connect (OSTI)

    None

    1980-12-01T23:59:59.000Z

    The changes in generating capacity projected for 1980 to 1989 are summarized. Tabulated data provide summaries to the information on projected generating unit construction, retirements, and changes, in several different categories and groupings. The new generating units to be completed by the end of 1989 total 699, representing 259,490 megawatts. This total includes 10 wind power and one fuel cell installations totaling 48.5 MW to be completed by the end of 1989. There are 321 units totaling 13,222 MW to be retired. There are capacity changes due to upratings and deratings. Summary data are presented for: total requirement for electric energy generation for 1985; hydroelectric energy production for 1985; nuclear energy production for 1985; geothermal and other energy production for 1985; approximate non-fossil generation for 1985; range of fossil energy requirements for 1985; actual fossil energy sources 1974 to 1979; estimated range of fossil fuel requirements for 1985; coal capacity available in 1985; and computation of fuel use in 1985. Power plant capacity factors are presented. Extensive data on proposed generating capacity changes by individual units in the 9 Regional Electric Reliability Councils are presented.

  4. Western Area Power Administration combined power system financial statements September 30, 1994 and 1993 and management overview and performance measurements

    SciTech Connect (OSTI)

    Marwick, P.

    1994-12-31T23:59:59.000Z

    The attached report presents the results of the independent certified public accountant`s audit of the Department of Energy`s Western Area Power Administration`s (Western) combined financial statements as of September 30, 1994. The auditors have expressed an unqualified opinion on Western`s 1994 statements. Their reports on Western`s internal control structure and on compliance with laws and regulations are also provided. Western was established in December 1977, and has the responsibility for the Federal electric power marketing and transmission functions in 15 central and western states. Western markets power, as required by existing law, at the lowest possible rates consistent with sound business principles to recover the costs of operation and capital invested in power facilities.

  5. MURDOCH UNIVERSITY PERTH, WESTERN AUSTRALIA

    E-Print Network [OSTI]

    MURDOCH UNIVERSITY PERTH, WESTERN AUSTRALIA INAUGRATION CEREMONY 17TH SEPTEMBER, 1974 #12;ORDER Murdoch University, the second university to be established in Western Australia, and the eighteenth in Australia, was constituted 25 July 1973 by an Act of the Parliament of Western Australia. The initial

  6. Accounts Receivable Western Michigan University

    E-Print Network [OSTI]

    de Doncker, Elise

    Accounts Receivable Western Michigan University 1903 W. Michigan Avenue Kalamazoo, MI 49008 have read the Western Michigan University Third Party Billing Policy and agree to the terms. I am authorizing Western Michigan University to bill for the specified tuition and related fees for the term

  7. Accounts Receivable Western Michigan University

    E-Print Network [OSTI]

    de Doncker, Elise

    Accounts Receivable Western Michigan University 1903 W. Michigan Avenue Kalamazoo, MI 49008-5210 269 387-4251 Fax 269 387-4227 THIRD PARTY BILLING POLICY Western Michigan University (WMU# (269) 387-4227 Western Michigan University 1903 W. Michigan Avenue E-mail: wmu

  8. WESTERN MICHIGAN UNIVERSITY STUDENT CODE

    E-Print Network [OSTI]

    de Doncker, Elise

    WESTERN MICHIGAN UNIVERSITY STUDENT CODE Approved by The Western Michigan University Board Michigan University Kalamazoo, MI 49008 Effective August 2008 #12;A UNIVERSITY COMMUNITY IS... ...a for the Advancement of Teaching; Ernest L. Boyer (frwd.); Princeton, New Jersey; 1990 #12;WESTERN MICHIGAN UNIVERSITY

  9. ELECTR-5939; No of Pages 6 Please cite this article in press as: A. Sopinka, Variable Energy Resources: VERy Interesting Implications for the Western Interconnect, Electr. J. (2013), http://dx.doi.org/10.1016/j.tej.2013.04.015

    E-Print Network [OSTI]

    Pedersen, Tom

    2013-01-01T23:59:59.000Z

    The North American bulk power system is comprised of four interconnected regions: the Western Interconnect region comprises 37 balancing authorities located across Alberta and British Columbia, known hereafter.D. at the University of Victoria. Her dissertation work focused on the economic and environmental effects of wind

  10. Western Wind and Solar Integration Study: Hydropower Analysis

    SciTech Connect (OSTI)

    Acker, T.; Pete, C.

    2012-03-01T23:59:59.000Z

    The U.S. Department of Energy's (DOE) study of 20% Wind Energy by 2030 was conducted to consider the benefits, challenges, and costs associated with sourcing 20% of U.S. energy consumption from wind power by 2030. This study found that with proactive measures, no insurmountable barriers were identified to meet the 20% goal. Following this study, DOE and the National Renewable Energy Laboratory (NREL) conducted two more studies: the Eastern Wind Integration and Transmission Study (EWITS) covering the eastern portion of the U.S., and the Western Wind and Solar Integration Study (WWSIS) covering the western portion of the United States. The WWSIS was conducted by NREL and research partner General Electric (GE) in order to provide insight into the costs, technical or physical barriers, and operational impacts caused by the variability and uncertainty of wind, photovoltaic, and concentrated solar power when employed to serve up to 35% of the load energy in the WestConnect region (Arizona, Colorado, Nevada, New Mexico, and Wyoming). WestConnect is composed of several utility companies working collaboratively to assess stakeholder and market needs to and develop cost-effective improvements to the western wholesale electricity market. Participants include the Arizona Public Service, El Paso Electric Company, NV Energy, Public Service of New Mexico, Salt River Project, Tri-State Generation and Transmission Cooperative, Tucson Electric Power, Xcel Energy and the Western Area Power Administration.

  11. Sequential Linear Programming Coordination Strategy for Deterministic and Probabilistic

    E-Print Network [OSTI]

    Papalambros, Panos

    electric fuel cell vehicle design model, including enterprise, powertrain, fuel cell and battery models using an L norm to measure deviations between targets and responses. A subproblem suspension strategy on trust region and target value step size. A global convergence proof of the SLP-based coordination

  12. Designing pricing strategies for coordination of networked distributed energy resources

    E-Print Network [OSTI]

    Liberzon, Daniel

    Designing pricing strategies for coordination of networked distributed energy resources Bahman, by a group of distributed energy resources (DERs). The aggregator interacts with the wholesale electricity. The objective is for the aggregator to design a pricing strategy for incentivizing DERs to modify their active

  13. Coordinating Energy Efficiency with Other Disaster Resiliency...

    Energy Savers [EERE]

    Coordinating Energy Efficiency with Other Disaster Resiliency Services Coordinating Energy Efficiency with Other Disaster Resiliency Services Better Buildings Residential Network...

  14. Coordinating Energy Efficiency With Water Conservation Services...

    Energy Savers [EERE]

    Coordinating Energy Efficiency With Water Conservation Services Coordinating Energy Efficiency With Water Conservation Services Better Buildings Residential Network Program...

  15. Coordinate transformations in quaternion spaces

    E-Print Network [OSTI]

    Zihua Weng

    2009-05-15T23:59:59.000Z

    The quaternion spaces can be used to describe the property of electromagnetic field and gravitational field. In the quaternion space, some coordinate transformations can be deduced from the feature of quaternions, including Lorentz transformation and Galilean transformation etc., when the coordinate system is transformed into others. And some coordinate transformations with variable speed of light can be obtained in the electromagnetic field and gravitational field.

  16. JOURNAL OF GEOPHYSICAL RESEARCH, VOL. ???, XXXX, DOI:10.1029/, Altitude-Adjusted Corrected Geomagnetic Coordinates

    E-Print Network [OSTI]

    Shepherd, Simon

    ]; and satellite measurements of particles and electric currents to determine magnetospheric boundaries and large Geomagnetic Coordinates: Definition and Functional Approximations S. G. Shepherd Thayer School of Engineering to transform between geo- graphic and Altitude-Adjusted Corrected Geomagnetic (AACGM) coordinates reveals

  17. Consensus + Innovations Approach for Distributed Multi-Agent Coordination in a Microgrid

    E-Print Network [OSTI]

    Kar, Soummya

    in which distributed resources and loads form microgrids within the bulk power system in which load1 Consensus + Innovations Approach for Distributed Multi-Agent Coordination in a Microgrid Gabriela- agement are expected to become more prevalent in the future electric power system. Coordinating

  18. Assistance to States on Electric Industry Issues

    SciTech Connect (OSTI)

    Glen Andersen

    2010-10-25T23:59:59.000Z

    This project seeks to educate state policymakers through a coordinated approach involving state legislatures, regulators, energy officials, and governors’ staffs. NCSL’s activities in this project focus on educating state legislators. Major components of this proposal include technical assistance to state legislatures, briefing papers, coordination with the National Council on Electricity Policy, information assistance, coordination and outreach, meetings, and a set of transmission-related activities.

  19. Level 2 2013/14 Electrical and Electronic Engineering

    E-Print Network [OSTI]

    Harman, Neal.A.

    Level 2 2013/14 Electrical and Electronic Engineering BEng Electronic and Electrical Engineering[H602,H603,H605] BEng Electronic and Electrical Engineering (with a Year in Industry)[H603] MEng Electronic and Electrical Engineering[H600,H606] Coordinator: Dr. T Davies Semester 1 Modules Semester 2

  20. Level 3 2013/14 Electrical and Electronic Engineering

    E-Print Network [OSTI]

    Harman, Neal.A.

    Level 3 2013/14 Electrical and Electronic Engineering BEng Electronic and Electrical Engineering[H602,H603,H605] BEng Electronic and Electrical Engineering (with a Year in Industry)[H603] MEng Electronic and Electrical Engineering[H600,H606] Coordinator: Dr. A Mehta Semester 1 Modules Semester 2

  1. Western Regional Partnership Overview

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradley Nickell DirectorThe&Management Alert Western Area

  2. Intramolecular Strain Coordinates Kinesin Stepping

    E-Print Network [OSTI]

    Vale, Ronald D.

    Intramolecular Strain Coordinates Kinesin Stepping Behavior along Microtubules Ahmet Yildiz,1: vale@cmp.ucsf.edu DOI 10.1016/j.cell.2008.07.018 SUMMARY Kinesin advances 8 nm along a microtubule per ATP hydrolyzed, but the mechanism responsible for coordinating the enzymatic cycles of kinesin's two

  3. GEAR Tech-21 Geographic Coordinates

    E-Print Network [OSTI]

    Farritor, Shane

    and two others on the grid below: Important Terms #12;GEAR Tech-21 Geographic Coordinates How Far Are They on the grid below. You will need to label your grid. Using the data you collected, relate the points to one Coordinates Map Challenge Lincoln, Nebraska: Two cities with the same latitude: Two cities with the same

  4. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01T23:59:59.000Z

    Investments in the WECC. ” The Electricity Journal 22(9):Coordinating Council (WECC). In Section 3 we examine theannual energy demand in the WECC with new RE for a target

  5. Coordination of Energy Efficiency and Demand Response

    SciTech Connect (OSTI)

    Goldman, Charles; Reid, Michael; Levy, Roger; Silverstein, Alison

    2010-01-29T23:59:59.000Z

    This paper reviews the relationship between energy efficiency and demand response and discusses approaches and barriers to coordinating energy efficiency and demand response. The paper is intended to support the 10 implementation goals of the National Action Plan for Energy Efficiency's Vision to achieve all cost-effective energy efficiency by 2025. Improving energy efficiency in our homes, businesses, schools, governments, and industries - which consume more than 70 percent of the nation's natural gas and electricity - is one of the most constructive, cost-effective ways to address the challenges of high energy prices, energy security and independence, air pollution, and global climate change. While energy efficiency is an increasingly prominent component of efforts to supply affordable, reliable, secure, and clean electric power, demand response is becoming a valuable tool in utility and regional resource plans. The Federal Energy Regulatory Commission (FERC) estimated the contribution from existing U.S. demand response resources at about 41,000 megawatts (MW), about 5.8 percent of 2008 summer peak demand (FERC, 2008). Moreover, FERC recently estimated nationwide achievable demand response potential at 138,000 MW (14 percent of peak demand) by 2019 (FERC, 2009).2 A recent Electric Power Research Institute study estimates that 'the combination of demand response and energy efficiency programs has the potential to reduce non-coincident summer peak demand by 157 GW' by 2030, or 14-20 percent below projected levels (EPRI, 2009a). This paper supports the Action Plan's effort to coordinate energy efficiency and demand response programs to maximize value to customers. For information on the full suite of policy and programmatic options for removing barriers to energy efficiency, see the Vision for 2025 and the various other Action Plan papers and guides available at www.epa.gov/eeactionplan.

  6. Western Area Power Administration annual site environmental report for calendar year 2005

    SciTech Connect (OSTI)

    none,

    2005-12-31T23:59:59.000Z

    This document outlines the accomplishments and status of the environmental program of the Western Area Power Administration (Western) for calendar year 2005. In 2005, Western submitted 190 reports to state and local emergency response personnel and had 60 California Hazardous Materials Business Plans in place as required under the Emergency Planning and Community Right-to-Know Act. These reports identify the hazardous substances contained at these sites. At sites where potential oil spills could harm surrounding ecosystems and waterways, Western prepares Spill Prevention, Control, and Countermeasure (SPCC) plans. These plans identify measures to prevent spills from harming the environment, such as identifying the need for secondary containment at facilities. Western currently has SPCC plans for 154 facilities in 13 states. In 2005, Western updated 19 SPCC plans and prepared one new plan. Western operated under 107 environmental permits in 2005. Western evaluates the impact of its planned actions on the environment by preparing National Environmental Policy Act documentation. In 2005, Western completed or was working on 60 categorical exclusions, 18 environmental assessments and eight environmental impact statements, issued six Findings of No Significant Impact, and prepared four Mitigation Action Plans. Western held several public workshops/meetings and consulted with 70 American Indian Tribes for various projects. In 2005, Western was working on or had completed 11 Section 7 consultations under the Endangered Species Act. In 2005, Western recycled more than 3,600 metric tons of electrical equipment, mineral oil dielectric fluid, asphalt, fluorescent and metal halide light bulbs, wood poles and crossarms, and other items as well as office waste. Western made $437,816 worth of purchases containing recovered content materials. Western met the requirement of Executive Order 13148, Greening the Government through Leadership in Environmental Management to have its Environmental Management System in place by December 31, 2005.

  7. 2014 State of Western's Assets

    SciTech Connect (OSTI)

    none,

    2014-01-01T23:59:59.000Z

    In this report we document the State of Western’s Assets in terms of physical equipment, financial resources, strategic direction, and human capital, both at the organizational and regional levels. We identify the condition of our assets today and share what work we will be doing in these areas in the coming years.

  8. Electrical Engineer

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Protection and Communication Maintenance (G5300) 615 S....

  9. Western Wind and Solar Integration Study (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-09-01T23:59:59.000Z

    Initiated in 2007 to examine the operational impact of up to 35% penetration of wind, photovoltaic (PV), and concentrating solar power (CSP) energy on the electric power system, the Western Wind and Solar Integration Study (WWSIS) is one of the largest regional wind and solar integration studies to date. The goal is to understand the effects of variability and uncertainty of wind, PV, and CSP on the grid. In the Western Wind and Solar Integration Study Phase 1, solar penetration was limited to 5%. Utility-scale PV was not included because of limited capability to model sub-hourly, utility-scale PV output . New techniques allow the Western Wind and Solar Integration Study Phase 2 to include high penetrations of solar - not only CSP and rooftop PV but also utility-scale PV plants.

  10. LLP/ERASMUS Institutional Coordinator

    E-Print Network [OSTI]

    Pfeifer, Holger

    (BA/MA) Departmental Coordinator: Prof. Dr. Olga Pollatos olga.pollatos@uni-ulm.de Computer Science (481) Study Programs taught in German: Informatik (BA/MA) Medieninformatik (BA/MA) Software Engineering

  11. Suspect Counterfeit Coordinators, February 2015

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ETTPEM Susan Kimmerly PQA Manager 865-574-8242 LOW@bechteljacobs.org Tom Warnick SCI SME 865-241-9516 7TO@bechteljacobs.org Fossil Energy HQFE Connie Lorenz HQ SCI Coordinator...

  12. Suspect Counterfeit Coordinators, April 2015

    Broader source: Energy.gov (indexed) [DOE]

    ETTPEM Susan Kimmerly PQA Manager 865-574-8242 LOW@bechteljacobs.org Tom Warnick SCI SME 865-241-9516 7TO@bechteljacobs.org Fossil Energy HQFE Connie Lorenz HQ SCI Coordinator...

  13. INTERNATIONAL SPACE EXPLORATION COORDINATION GROUP

    E-Print Network [OSTI]

    space exploration infrastructure standards facilitating interoperability through an international with relevant existing international working groups/ organisations. · Preparation and Organization of a WS1 INTERNATIONAL SPACE EXPLORATION COORDINATION GROUP WORKPLAN Update following 3rd ISECG Meeting

  14. DOE: Quantifying the Value of Hydropower in the Electric Grid

    SciTech Connect (OSTI)

    None

    2012-12-31T23:59:59.000Z

    The report summarizes research to Quantify the Value of Hydropower in the Electric Grid. This 3-year DOE study focused on defining value of hydropower assets in a changing electric grid. Methods are described for valuation and planning of pumped storage and conventional hydropower. The project team conducted plant case studies, electric system modeling, market analysis, cost data gathering, and evaluations of operating strategies and constraints. Five other reports detailing these research results are available a project website, www.epri.com/hydrogrid. With increasing deployment of wind and solar renewable generation, many owners, operators, and developers of hydropower have recognized the opportunity to provide more flexibility and ancillary services to the electric grid. To quantify value of services, this study focused on the Western Electric Coordinating Council region. A security-constrained, unit commitment and economic dispatch model was used to quantify the role of hydropower for several future energy scenarios up to 2020. This hourly production simulation considered transmission requirements to deliver energy, including future expansion plans. Both energy and ancillary service values were considered. Addressing specifically the quantification of pumped storage value, no single value stream dominated predicted plant contributions in various energy futures. Modeling confirmed that service value depends greatly on location and on competition with other available grid support resources. In this summary, ten different value streams related to hydropower are described. These fell into three categories; operational improvements, new technologies, and electricity market opportunities. Of these ten, the study was able to quantify a monetary value in six by applying both present day and future scenarios for operating the electric grid. This study confirmed that hydropower resources across the United States contribute significantly to operation of the grid in terms of energy, capacity, and ancillary services. Many potential improvements to existing hydropower plants were found to be cost-effective. Pumped storage is the most likely form of large new hydro asset expansions in the U.S. however, justifying investments in new pumped storage plants remains very challenging with current electricity market economics. Even over a wide range of possible energy futures, up to 2020, no energy future was found to bring quantifiable revenues sufficient to cover estimated costs of plant construction. Value streams not quantified in this study may provide a different cost-benefit balance and an economic tipping point for hydro. Future studies are essential in the quest to quantify the full potential value. Additional research should consider the value of services provided by advanced storage hydropower and pumped storage at smaller time steps for integration of variable renewable resources, and should include all possible value streams such as capacity value and portfolio benefits i.e.; reducing cycling on traditional generation.

  15. Electric power emergency handbook

    SciTech Connect (OSTI)

    Labadie, J.R.

    1980-09-01T23:59:59.000Z

    The Emergency Electric Power Administration's Emergency Operations Handbook is designed to provide guidance to the EEPA organization. It defines responsibilities and describes actions performed by the government and electric utilities in planning for, and in operations during, national emergencies. The EEPA Handbook is reissued periodically to describe organizational changes, to assign new duties and responsibilities, and to clarify the responsibilities of the government to direct and coordinate the operations of the electric utility industry under emergencies declared by the President. This Handbook is consistent with the assumptions, policies, and procedures contained in the National Plan for Emergency Preparedness. Claimancy and restoration, communications and warning, and effects of nuclear weapons are subjects covered in the appendices.

  16. Coordination of Energy Efficiency and Demand Response

    E-Print Network [OSTI]

    Goldman, Charles

    2010-01-01T23:59:59.000Z

    California Long-term Energy Efficiency Strategic Plan. B-2 Coordination of Energy Efficiency and Demand Response> B-4 Coordination of Energy Efficiency and Demand Response

  17. Information Security: Coordination of Federal Cyber Security...

    Office of Environmental Management (EM)

    Security: Coordination of Federal Cyber Security Research and Development Information Security: Coordination of Federal Cyber Security Research and Development GAO recommends that...

  18. CLEERS Coordination & Development of Catalyst Process Kinetic...

    Energy Savers [EERE]

    CLEERS Coordination & Development of Catalyst Process Kinetic Data - Pres. 1: Coordination of CLEERS Project; Pres. 2: ORNL Research on LNT Sulfation & Desulfation CLEERS...

  19. AVTA: 2010 Electric Vehicles International Neighborhood Electric...

    Energy Savers [EERE]

    10 Electric Vehicles International Neighborhood Electric Vehicle Testing Results AVTA: 2010 Electric Vehicles International Neighborhood Electric Vehicle Testing Results The...

  20. Colorado Highlands Wind Project, Western's RM Environment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Colorado Highlands Wind Project Western Area Power Administration, Rocky Mountain Region (Western) has received a request from Colorado Highlands Wind to modify its Interconnection...

  1. Western Regional Emergency Medicine Student Symposium

    E-Print Network [OSTI]

    Joseph, Daniel A; Fernandez, Jorge

    2009-01-01T23:59:59.000Z

    Western Regional Emergency Medicine Student Symposium DanielFernandez, MD Keck School of Medicine of the University ofDepartment of Emergency Medicine, Los Angles, CA The Western

  2. Coordinating Interstate ElectricTransmission Siting: An Introduction...

    Broader source: Energy.gov (indexed) [DOE]

    the near future. While improved demand-side management (including energy effi ciency and demand response), bett er utilization of the existing transmission grid, and other...

  3. Coordinating Interstate ElectricTransmission Siting: An Introduction to the

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613PortsmouthBartlesvilleAbout » Contact Us ContactPractices in IndianDebate | Department

  4. Coordinating Interstate ElectricTransmission Siting: An Introduction to the

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S. DepartmentEnergy This partAsAmanda McAlpin So you'veDepartment ofDebate |

  5. Coordinating Interstate Electric Transmission Siting: An Introduction to

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model, clickInformationNew| ExplorationCooperstown, Wisconsin: Energythe Debate |

  6. Title 10 CFR 900 Coordination of Federal Authorizations for Electric

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries PvtStratosolarTharaldson EthanolTillson, New5661°, -86.0529604°| Open

  7. Type A Accident Investigation Report – Western Area Power Administration Investigation of the June 7, 2004, Construction Contractor Electrical Accident at Double-Circuit Structure 38/1, Watertown-Granite Falls 230-kV Transmission Line East of Watertown, S

    Broader source: Energy.gov [DOE]

    This report is an independent product of the Type A Accident Investigation board appointed by Timothy J. Meeks, Chief Operating Officer, Western Area Power Administration.

  8. Approaches To Integrating A HIgh Penertration Of Solar PV and CPV Onto The Electrical Grid

    E-Print Network [OSTI]

    Hill, Steven Craig

    2013-01-01T23:59:59.000Z

    Electric Coordinating Council (WECC), the National RenewableSubstations Recommendations For WECC Transmission Expansioncoordinated with the CAISO and WECC. OTHER The target budget

  9. National Electrical Manufacturers Association

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently Asked QuestionsDepartment of Energyof Energy U.S.August 2014WesternElectrical

  10. Western Energy Corridor -- Energy Resource Report

    SciTech Connect (OSTI)

    Leslie Roberts; Michael Hagood

    2011-06-01T23:59:59.000Z

    The world is facing significant growth in energy demand over the next several decades. Strategic in meeting this demand are the world-class energy resources concentrated along the Rocky Mountains and northern plains in Canada and the U.S., informally referred to as the Western Energy Corridor (WEC). The fossil energy resources in this region are rivaled only in a very few places in the world, and the proven uranium reserves are among the world's largest. Also concentrated in this region are renewable resources contributing to wind power, hydro power, bioenergy, geothermal energy, and solar energy. Substantial existing and planned energy infrastructure, including refineries, pipelines, electrical transmission lines, and rail lines provide access to these resources.

  11. U.S. Energy Information Administration (EIA) - Source

    Gasoline and Diesel Fuel Update (EIA)

    Region - Southwest Power Pool South XLS Table 55.19. Electric Power Projections for EMM Region - Western Electricity Coordinating Council Southwest XLS Table 55.2. Electric...

  12. U.S. Energy Information Administration (EIA) - Topics

    Gasoline and Diesel Fuel Update (EIA)

    Region - Southwest Power Pool South XLS Table 55.19. Electric Power Projections for EMM Region - Western Electricity Coordinating Council Southwest XLS Table 55.2. Electric...

  13. ECE 3301: General Electrical Engineering Credit / Contact hours: 3 / 3

    E-Print Network [OSTI]

    Gelfond, Michael

    ECE 3301: General Electrical Engineering Credit / Contact hours: 3 / 3 Course coordinator: Mary Baker Textbook(s) and/or other required material: Hambley, Allan R., Electrical Engineering ­ Principles and Applications, fourth edition, Prentice Hall, 2007. Catalog description: Analysis of electric circuits

  14. RECIPROCAL BORROWING Western Australian University Libraries

    E-Print Network [OSTI]

    , The University of Western Australia and University of Notre Dame Australia. Western Australian University to 30 items on loan at any one time from The University of Western Australia, and up to 12 items fromRECIPROCAL BORROWING Western Australian University Libraries This guide explains the reciprocal

  15. Western Wind and Solar Integration Study

    SciTech Connect (OSTI)

    Lew, D.; Piwko, R.; Jordan, G.; Miller, N.; Clark, K.; Freeman, L.; Milligan, M.

    2011-01-01T23:59:59.000Z

    The Western Wind and Solar Integration Study (WWSIS) is one of the largest regional wind and solar integration studies to date. It was initiated in 2007 to examine the operational impact of up to 35% energy penetration of wind, photovoltaics (PV), and concentrating solar power (CSP) on the power system operated by the WestConnect group of utilities in Arizona, Colorado, Nevada, New Mexico, and Wyoming (see study area map). WestConnect also includes utilities in California, but these were not included because California had already completed a renewable energy integration study for the state. This study was set up to answer questions that utilities, public utilities commissions, developers, and regional planning organizations had about renewable energy use in the west: (1) Does geographic diversity of renewable energy resource help mitigate variability; (2) How do local resources compare to out-of-state resources; (3) Can balancing area cooperation help mitigate variability; (4) What is the role and value of energy storage; (5) Should reserve requirements be modified; (6) What is the benefit of forecasting; and (7) How can hydropower help with integration of renewables? The Western Wind and Solar Integration Study is sponsored by the U.S. Department of Energy (DOE) and run by NREL with WestConnect as a partner organization. The study follows DOE's 20% Wind Energy by 2030 report, which did not find any technical barriers to reaching 20% wind energy in the continental United States by 2030. This study and its partner study, the Eastern Wind Integration and Transmission Study, performed a more in-depth operating impact analysis to see if 20% wind energy was feasible from an operational level. In DOE/NREL's analysis, the 20% wind energy target required 25% wind energy in the western interconnection; therefore, this study considered 20% and 30% wind energy to bracket the DOE analysis. Additionally, since solar is rapidly growing in the west, 5% solar was also considered in this study. The goal of the Western Wind and Solar Integration Study is to understand the costs and operating impacts due to the variability and uncertainty of wind, PV, and CSP on the grid. This is mainly an operations study, (rather than a transmission study), although different scenarios model different transmission build-outs to deliver power. Using a detailed power system production simulation model, the study identifies operational impacts and challenges of wind energy penetration up to 30% of annual electricity consumption.

  16. Electricity Reliability

    E-Print Network [OSTI]

    electric power equipment with more energy efficiency and higher capacity than today's systems of modernizing the electric grid to meet the nations's need for reliable, electric power, enhancing security continues to increase within the electricity infrastructure. DOE is conducting research, development

  17. Biennial Assessment of the Fifth Power Plan Interim Report on Electric Price Forecasts

    E-Print Network [OSTI]

    because natural gas fired electric generating plants are on the margin much of the time in Western marketsBiennial Assessment of the Fifth Power Plan Interim Report on Electric Price Forecasts Electricity prices in the Council's Power Plan are forecast using the AURORATM Electricity Market Model of the entire

  18. National Electric Transmission Congestion Study 2012 Western Workshops

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently Asked QuestionsDepartment of Energyof Energy U.S.August 2014 |EXECUTIVE

  19. Panhandle Region Transportation Coordination Study

    E-Print Network [OSTI]

    Panhandle Regional Transportation Advisory Group

    drivers; shared office staff with PCS Schedule for out of county trips Amarillo MWF Notes on Service Provided Medicaid to Amarillo M-F; school trips M-F; Hereford Satellite Center; some trips to Hereford Senior Center and nursing homes Table 2............................................................................................................................ 2-5 Health and Human Services Organizations ................................................................................. 2-9 History of Regional Coordination of Public Transportation .................................................... 2...

  20. LAGRANGIAN COORDINATES AND MULTICLASS MODELS

    E-Print Network [OSTI]

    Vuik, Kees

    LAGRANGIAN COORDINATES AND MULTICLASS MODELS The kinematic wave model, also known as the Lighthill. introduced a kinematic wave model with multiple user classes (7). They show qualitatively Formulation of Multiclass Kinematic Wave Model Femke van Wageningen-Kessels, Hans van Lint, Serge P

  1. Noncommutative electrodynamics with covariant coordinates

    SciTech Connect (OSTI)

    Zahn, Jochen [II. Institut fuer Theoretische Physik, Universitaet Hamburg, Luruper Chausse 149, 22761 Hamburg (Germany)

    2004-11-15T23:59:59.000Z

    We study noncommutative electrodynamics using the concept of covariant coordinates. We propose a scheme for interpreting the formalism and construct two basic examples, a constant field and a plane wave. Superposing these two, we find a modification of the dispersion relation. Our results differ from those obtained via the Seiberg-Witten map.

  2. ASTER Thermal Anomalies in western Colorado

    SciTech Connect (OSTI)

    Zehner, Richard E.

    2013-01-01T23:59:59.000Z

    Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Publication Date: 2012 Title: ASTER Thermal Anomalies Western Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science (CIRES), University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains the areas identified as areas of anomalous surface temperature from ASTER satellite imagery. The temperature is calculated using the Emissivity Normalization Algorithm that separate temperature from emissivity. Areas that had temperature greater than 2?, and areas with temperature equal to 1? to 2?, were considered ASTER modeled very warm and warm surface exposures (thermal anomalies), respectively Spatial Domain: Extent: Top: 4547052.446651 m Left: 158917.090117 m Right: 4101162.228281 m Bottom: 4101162.228281 m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System ’1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shape file

  3. Keep in mind, that with formality, often comes more of a standing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advisor, Department of Energy (confirmed) Western Electricity Coordinating Council (WECC) RTEP Status Update Byron Woertz, Senior Project Manager, WECC (confirmed) Western...

  4. BPA Fact Sheet - Preparing for reliability entity registration...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Western Electric Coordinating Council (WECC) fulfi lls this role in the Western interconnection and has asked entities within this area to register according to the NERC...

  5. Porphyrin coordination polymer nanospheres and nanorods

    DOE Patents [OSTI]

    Wang, Zhongchun; Shelnutt, John A.; Medforth, Craig J.

    2012-12-04T23:59:59.000Z

    A porphyrin coordination polymer nanostructure comprising a network of pyridyl porphyrin molecules and coordinating metal ions coordinatively bound through the pyridyl groups. In some embodiments, the porphyrins are metalloporphyrins. A variety of nanostructures are formed by the network polymer, including nanospheres, polygonal nanostructures, nanorods, and nanofibers, depending on a variety of factors including coordination metal ion, porphyrin type, metal of the metalloporphyrin, and degree of agitation during nanostructure formation. Reduction of coordinating metal ions may be used to form metal nanoparticles on the coordination polymer nanostructure.

  6. Optimal State Electric Supply in Texas -- Overview and Progress

    E-Print Network [OSTI]

    Moore, B.

    In 1988, the results of the PUCT Bulk Power Transmission Study indicated a range of potential cost savings which could result from greater coordination of power transfers among the utilities in Texas which comprise the Electric Reliability Council...

  7. Impacts of Western Area Power Administration`s power marketing alternatives on utility demand-side management and conservation and renewable energy programs

    SciTech Connect (OSTI)

    Cavallo, J.D.; Germer, M.F.; Tompkins, M.M.

    1995-03-01T23:59:59.000Z

    The Western Area Power Administration (Western) requires all of its long-term firm power customers to implement programs that promote the conservation of electric energy or facilitate the use of renewable energy resources. Western has also proposed that all customers develop integrated resource plans that include cost-effective demand-side management programs. As part of the preparation of Western`s Electric Power Marketing Environmental Impact Statement, Argonne National Laboratory (ANL) developed estimates of the reductions in energy demand resulting from Western`s conservation and renewable energy activities in its Salt Lake City Area Office. ANL has also estimated the energy-demand reductions from cost-effective, demand-side management programs that could be included in the integrated resource plans of the customers served by Western`s Salt Lake City Area Office. The results of this study have been used to adjust the expected hourly demand for Western`s major systems in the Salt Lake City Area. The expected hourly demand served as the basis for capacity expansion plans develops with ANL`s Production and Capacity Expansion (PACE) model.

  8. 2011 Wind Technologies Market Report

    E-Print Network [OSTI]

    Bolinger, Mark

    2013-01-01T23:59:59.000Z

    June 2012. Western Electricity Coordinating Council (WECC).2011. WECC Efficient Dispatch Toolkit Cost-Benefit Analysis.Coordinating Council (WECC). 2010. Scope of the Efficient

  9. Western Europe's future gas supplies

    SciTech Connect (OSTI)

    Kardaun, G.

    1983-05-01T23:59:59.000Z

    Decline in indigenous natural gas production by 2000 will be compensated by imported natural gas and LNG and gas from unconventional sources. Coal gas will furnish about 10 percent of the demand, more natural gas imports will come from North Africa and the USSR and additional LNG will come from West Africa, the Middle East and the Western Hemisphere.

  10. WESTERN WATER ASSESSMENT WHITE PAPER

    E-Print Network [OSTI]

    Neff, Jason

    the socio-economic effects of drought. Strategic Goals Following the findings and recommendations from two (outside of agriculture) · Few "disaster" declarations · Not even a unified roster of drought eventsWESTERN WATER ASSESSMENT WHITE PAPER Tracking Socioeconomic Impacts of Drought with Rapid Analytics

  11. Coordination and sharing at the interfaces

    E-Print Network [OSTI]

    Lin, Vivian I-Wen, 1972-

    2002-01-01T23:59:59.000Z

    This thesis examines properties of a type of coordinate structure that involves shared material (i.e., elements above the point coordination that c-command all of the conjuncts), what is referred to as a sharing structure. ...

  12. Wilson Wong The University of Western Australia, Australia

    E-Print Network [OSTI]

    Hammerton, James

    Wilson Wong The University of Western Australia, Australia Wei Liu The University of Western Australia, Australia Mohammed Bennamoun The University of Western Australia, Australia Ontology Learning

  13. Optimization Online - Efficient parallel coordinate descent algorithm ...

    E-Print Network [OSTI]

    Ion Necoara

    2012-11-02T23:59:59.000Z

    Nov 2, 2012 ... Efficient parallel coordinate descent algorithm for convex optimization problems with separable constraints: application to distributed MPC.

  14. Alamo Area Regional Public Transportation Coordination Plan

    E-Print Network [OSTI]

    Alamo Area Council of Governments

    2006-11-30T23:59:59.000Z

    for the technology, through New Freedom or FTA?s Intelligent Transportation Systems (ITS) initiatives. Coordination Task No. 2 ? Coordinating Services between ART and VIA This task calls for direct connections between ART and VIA at a variety of transfer... for the technology, through New Freedom or FTA?s Intelligent Transportation Systems (ITS) initiatives. Coordination Task No. 2 ? Coordinating Services between ART and VIA This task calls for direct connections between ART and VIA at a variety of transfer...

  15. Clean Cities Coordinator Awards (Fact sheet)

    SciTech Connect (OSTI)

    Not Available

    2004-06-01T23:59:59.000Z

    A Clean Cities publication regarding the Clean Cities Coordinator Award winners announced at the 2004 Clean Cities Conference.

  16. Communication and Coordination John H. Miller

    E-Print Network [OSTI]

    Communication and Coordination John H. Miller Scott Moser February 25, 2003 Abstract Remarkable coordinate are not well understood. Here we examine the role of communication in achieving coordination this question we employ an adaptive model of strategically communicating agents (Miller et al. [7]) playing

  17. Electric vehicles

    SciTech Connect (OSTI)

    Not Available

    1990-03-01T23:59:59.000Z

    Quiet, clean, and efficient, electric vehicles (EVs) may someday become a practical mode of transportation for the general public. Electric vehicles can provide many advantages for the nation's environment and energy supply because they run on electricity, which can be produced from many sources of energy such as coal, natural gas, uranium, and hydropower. These vehicles offer fuel versatility to the transportation sector, which depends almost solely on oil for its energy needs. Electric vehicles are any mode of transportation operated by a motor that receives electricity from a battery or fuel cell. EVs come in all shapes and sizes and may be used for different tasks. Some EVs are small and simple, such as golf carts and electric wheel chairs. Others are larger and more complex, such as automobile and vans. Some EVs, such as fork lifts, are used in industries. In this fact sheet, we will discuss mostly automobiles and vans. There are also variations on electric vehicles, such as hybrid vehicles and solar-powered vehicles. Hybrid vehicles use electricity as their primary source of energy, however, they also use a backup source of energy, such as gasoline, methanol or ethanol. Solar-powered vehicles are electric vehicles that use photovoltaic cells (cells that convert solar energy to electricity) rather than utility-supplied electricity to recharge the batteries. This paper discusses these concepts.

  18. Western Wind and Solar Integration Study

    SciTech Connect (OSTI)

    GE Energy

    2010-05-01T23:59:59.000Z

    This report provides a full description of the Western Wind and Solar Integration Study (WWSIS) and its findings.

  19. Remotely Sensed Thermal Anomalies in western Colorado

    SciTech Connect (OSTI)

    Hussein, Khalid

    2012-02-01T23:59:59.000Z

    Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Publication Date: 2012 Title: Landsat Thermal Anomalies Western Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science (CIRES), University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains the areas identified as areas of anomalous surface temperature from Landsat satellite imagery in Western Colorado. Data was obtained for two different dates. The digital numbers of each Landsat scene were converted to radiance and the temperature was calculated in degrees Kelvin and then converted to degrees Celsius for each land cover type using the emissivity of that cover type. And this process was repeated for each of the land cover types (open water, barren, deciduous forest and evergreen forest, mixed forest, shrub/scrub, grassland/herbaceous, pasture hay, and cultivated crops). The temperature of each pixel within each scene was calculated using the thermal band. In order to calculate the temperature an average emissivity value was used for each land cover type within each scene. The NLCD 2001 land cover classification raster data of the zones that cover Colorado were downloaded from USGS site and used to identify the land cover types within each scene. Areas that had temperature residual greater than 2?, and areas with temperature equal to 1? to 2?, were considered Landsat modeled very warm and warm surface exposures (thermal anomalies), respectively Spatial Domain: Extent: Top: 4546381.234113 m Left: 140556.857021 m Right: 573390.000000 m Bottom: 4094583.641581 m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System ’1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shape file

  20. Western Michigan University Office of Admissions

    E-Print Network [OSTI]

    de Doncker, Elise

    Western Michigan University Office of Admissions 1903 W Michigan Ave Kalamazoo MI 49008-5211 (269 for future reference) Eligibility REquiREmEnts Western Michigan University considers current high school: Western Michigan University AccountsReceivable 1903WMichiganAve KalamazooMI49008-5210 non-u.s. citiz

  1. Coordination polymers and building blocks based on ditopic heteroscorpionate ligands

    E-Print Network [OSTI]

    Santillan, Guillermo A.

    2009-01-01T23:59:59.000Z

    of Silver (I) Coordination Polymers formed through hydrogenBlocks for Coordination Polymers” Inorg. Chem. *One of theof Silver(I) Coordination Polymers Formed through Hydrogen

  2. Norm G. Hall Western Australian Marine Research laboratories

    E-Print Network [OSTI]

    Norm G. Hall Western Australian Marine Research laboratories Perth, Western Australia 6020, Western Australia. 61 50. Australia Ian C. Potter* School of Biological and Environmental Sciences, Murdoch University. Murdoch, Western Australia. 6 J50, Australia Comparisons between generalized growth

  3. Western Interconnection Energy Imbalance Market Status and Prospects (Presentation)

    SciTech Connect (OSTI)

    Milligan, M.; Kirby, B.; King, J.; Beuning, S.

    2011-10-01T23:59:59.000Z

    This presentation describes how a new wholesale electricity market for energy imbalance ancillary services could be implemented and operated. Some conclusions of this presentation are: (1) Method for calculating additional reserve requirements due to wind and solar production; (2) EIM results in substantial reduction in reserves requirements and ramping demand; (3) Reduced participation reduces benefits for all but reduces the benefits to non-participants the most; (4) Full participation leads to maximum benefit across the Western Interconnection, up to 42% of total reserve requirement; and (5) Regional EIM implementations have smaller but substantial benefits.

  4. EA-98-K Western Systems Power Pool | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015 Business42.1Energy |FinalEESS-7 to export electricCanada. EA-98-K Western

  5. EA-98-L Western Systems Power Pool | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015 Business42.1Energy |FinalEESS-7 to export electricCanada. EA-98-K WesternCanada

  6. Electrical Engineer

    Broader source: Energy.gov [DOE]

    The incumbent in this position will serve as an Electrical Engineer in the Strategy and Program Management organization of Transmission Services. The Strategy and Program Management organization is...

  7. Electric Vehicles

    ScienceCinema (OSTI)

    Ozpineci, Burak

    2014-07-23T23:59:59.000Z

    Burak Ozpineci sees a future where electric vehicles charge while we drive them down the road, thanks in part to research under way at ORNL.

  8. Electrical hazards

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and certification by ANL prior to use. The Control of Hazardous Energy Sources - LockoutTagout (LOTO) Types of Energy Sources 1. Electricity 2. Gas, steam & pressurized...

  9. Electric Vehicles

    SciTech Connect (OSTI)

    Ozpineci, Burak

    2014-05-02T23:59:59.000Z

    Burak Ozpineci sees a future where electric vehicles charge while we drive them down the road, thanks in part to research under way at ORNL.

  10. Electrical stator

    DOE Patents [OSTI]

    Fanning, Alan W. (San Jose, CA); Olich, Eugene E. (Aptos, CA)

    1994-01-01T23:59:59.000Z

    An electrical stator of an electromagnetic pump includes first and second spaced apart coils each having input and output terminals for carrying electrical current. An elongate electrical connector extends between the first and second coils and has first and second opposite ends. The connector ends include respective slots receiving therein respective ones of the coil terminals to define respective first and second joints. Each of the joints includes a braze filler fixedly joining the connector ends to the respective coil terminals for carrying electrical current therethrough.

  11. Co-ordination of Renewable Energy Support Schemes in the Stine Grenaa Jensen1

    E-Print Network [OSTI]

    Co-ordination of Renewable Energy Support Schemes in the EU Stine Grenaa Jensen1 and Poul Erik for renewable energy are regionalised. Two theoretical examples are used to explain interactive effects on, e. In a communication from the European Commission on Support for Electricity from Renewable Energy Sources

  12. Integrating Variable Renewable Energy in Electric Power Markets: Best Practices from International Experience

    SciTech Connect (OSTI)

    Cochran, J.; Bird, L.; Heeter, J.; Arent, D. A.

    2012-04-01T23:59:59.000Z

    Many countries -- reflecting very different geographies, markets, and power systems -- are successfully managing high levels of variable renewable energy on the electric grid, including that from wind and solar energy. This study documents the diverse approaches to effective integration of variable renewable energy among six countries -- Australia (South Australia), Denmark, Germany, Ireland, Spain, and the United States (Western region-Colorado and Texas)-- and summarizes policy best practices that energy ministers and other stakeholders can pursue to ensure that electricity markets and power systems can effectively coevolve with increasing penetrations of variable renewable energy. Each country has crafted its own combination of policies, market designs, and system operations to achieve the system reliability and flexibility needed to successfully integrate renewables. Notwithstanding this diversity, the approaches taken by the countries studied all coalesce around five strategic areas: lead public engagement, particularly for new transmission; coordinate and integrate planning; develop rules for market evolution that enable system flexibility; expand access to diverse resources and geographic footprint of operations; and improve system operations. The ability to maintain a broad ecosystem perspective, to organize and make available the wealth of experiences, and to ensure a clear path from analysis to enactment should be the primary focus going forward.

  13. Hot dry rock geothermal energy for U.S. electric utilities. Draft final report

    SciTech Connect (OSTI)

    Not Available

    1993-06-01T23:59:59.000Z

    In order to bring an electric utility component into the study of hot dry rock geothermal energy called for in the Energy Policy Act of 1992 (EPAct), EPRI organized a one-day conference in Philadelphia on January 14,1993. The conference was planned as the first day of a two-day sequence, by coordinating with the U.S. Geological Survey (USGS) and the U.S. Department of Energy (DOE). These two federal agencies were charged under EPAct with the development of a report on the potential for hot dry rock geothermal energy production in the US, especially the eastern US. The USGS was given lead responsibility for a report to be done in association with DOE. The EPRI conference emphasized first the status of technology development and testing in the U.S. and abroad, i.e., in western Europe, Russia and Japan. The conference went on to address the extent of knowledge regarding the resource base in the US, especially in the eastern half of the country, and then to address some practical business aspects of organizing projects or industries that could bring these resources into use, either for thermal applications or for electric power generation.

  14. adamantine-dicarboxylate coordination complexes: Topics by E...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Multiagent systems, Coordination, Planning, Resource Kropf, Peter 25 Optical Design of Reflectionless Complex Media by Finite Embedded Coordinate Transformations...

  15. Electric machine

    DOE Patents [OSTI]

    El-Refaie, Ayman Mohamed Fawzi (Niskayuna, NY); Reddy, Patel Bhageerath (Madison, WI)

    2012-07-17T23:59:59.000Z

    An interior permanent magnet electric machine is disclosed. The interior permanent magnet electric machine comprises a rotor comprising a plurality of radially placed magnets each having a proximal end and a distal end, wherein each magnet comprises a plurality of magnetic segments and at least one magnetic segment towards the distal end comprises a high resistivity magnetic material.

  16. Electrical and Computer Engineering

    E-Print Network [OSTI]

    Weber, Rodney

    COE 1000 Electrical and Computer Engineering Jennifer Michaels Professor and Interim Associate Chair for Undergraduate Affairs School of Electrical and Computer Engineering Fall 2011 #12;Defining Electrical and Computer Engineering Electrical Engineering: Electrical engineers explore electrical phenomena

  17. East Texas Regional Transportation Coordination Plan

    E-Print Network [OSTI]

    East Texas Council of Governments

    transportation resources are utilized as efficiently as possible, the Texas Legislature passed HB 3588 in 2003, which amended the Texas Transportation Code to add Chapter 461 ? Statewide Coordination of Public Transportation. Its overall purpose is to maximize... transportation resources by coordinating services. The intent of coordination is to eliminate waste, generate increased efficiencies, and further the state?s efforts to reduce air pollution (Texas Statutes Transportation Code, 2006). The Texas Transportation...

  18. Athletic Training Coordinator Hometown: Colorado Springs, CO

    E-Print Network [OSTI]

    Van Stryland, Eric

    WHO WE ARE Gaby Bell Athletic Training Coordinator Hometown: Colorado Springs, CO Certifications Athletic Training Graduate Assistant Jonathan Hodapp Student Athletic Trainer Mike Carlson Student Athletic

  19. Optimization Online - Efficient Serial and Parallel Coordinate ...

    E-Print Network [OSTI]

    Peter Richtarik

    2011-08-02T23:59:59.000Z

    Aug 2, 2011 ... Efficient Serial and Parallel Coordinate Descent Methods for Huge-Scale Truss Topology Design. Peter Richtarik(peter.richtarik ***at*** ...

  20. Energy Agency Coordinators for Energy Action Month

    Broader source: Energy.gov [DOE]

    Agency coordinators serve as primary Federal agency points of contact for Energy Action Month. Contact them if you have questions about implementing an Energy Action Month campaign.

  1. Coordination of Energy Efficiency and Demand Response

    E-Print Network [OSTI]

    Goldman, Charles

    2010-01-01T23:59:59.000Z

    District Small Business Summer Solutions: Energy and DemandSummer Solutions: Energy and Demand Impacts Monthly Energy> B-2 Coordination of Energy Efficiency and Demand Response

  2. Coordination of Energy Efficiency and Demand Response

    E-Print Network [OSTI]

    Goldman, Charles

    2010-01-01T23:59:59.000Z

    of Energy demand-side management energy information systemdemand response. Demand-side management (DSM) program goalsa goal for demand-side management (DSM) coordination and

  3. CLEERS Coordination & Development of Catalyst Process Kinetic...

    Broader source: Energy.gov (indexed) [DOE]

    2: ORNL Research on LNT Sulfation & Desulfation (8744, 8746) Jae-Soon Choi Oak Ridge National Laboratory CLEERS Coordination & Development of Catalyst Process Kinetic Data...

  4. Western Solargenics | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwideWTED JumpHills, NewWestbrook, Minnesota:WesternSolargenics Jump to:

  5. Western Turbine | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwideWTED JumpHills, NewWestbrook, Minnesota:WesternSolargenicsTurbine

  6. Electrical connector

    DOE Patents [OSTI]

    Dilliner, Jennifer L.; Baker, Thomas M.; Akasam, Sivaprasad; Hoff, Brian D.

    2006-11-21T23:59:59.000Z

    An electrical connector includes a female component having one or more receptacles, a first test receptacle, and a second test receptacle. The electrical connector also includes a male component having one or more terminals configured to engage the one or more receptacles, a first test pin configured to engage the first test receptacle, and a second test pin configured to engage the second test receptacle. The first test receptacle is electrically connected to the second test receptacle, and at least one of the first test pin and the second test pin is shorter in length than the one or more terminals.

  7. EIS-0011: New Melones 230-kV Electrical Transmission Line, Central Valley Project, California

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Western Area Power Administration prepared this statement to evaluate the environmental impacts of proposed development of an electrical transmission system for the New Melones Power Plant.

  8. Problems of intraplate extensional tectonics, Western United...

    Open Energy Info (EERE)

    on the Great Basin Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Proceedings: Problems of intraplate extensional tectonics, Western United...

  9. Engineering Electrical &

    E-Print Network [OSTI]

    Hickman, Mark

    Computer Engineering Electrical & Electronic Engineering Mechatronics Engineering Mechanical Engineering Civil Engineering Natural Resources Engineering Forest Engineering Chemical & Process Engineering ELECTIVE 2 Required Engineering Intermediate Year 2011 Eight Required Courses Chart: 120 points College

  10. Engineering Electrical &

    E-Print Network [OSTI]

    Hickman, Mark

    Computer Engineering Electrical & Electronic Engineering Mechatronics Engineering Mechanical Engineering Civil Engineering Natural Resources Engineering Forest Engineering Chemical & Process Engineering ELECTIVE 2 Required Engineering Intermediate Year 2012 Eight Required Courses Chart: 120 points College

  11. Chapter 20. Work Breakdown and Coordination

    E-Print Network [OSTI]

    Brookhaven National Laboratory - Experiment 821

    Chapter 20. Work Breakdown and Coordination Revised March 1994 The leadership responsibility to level 4 of the work breakdown is shown below. The work breakdown was done by the ten technical teams. We breakdown for commissioning with beam. -- 404 -- #12; Work Breakdown and Coordination 405 #12; 406 Work

  12. Universal coordinates for Schwarzschild black holes

    E-Print Network [OSTI]

    W G Unruh

    2014-01-15T23:59:59.000Z

    A variety of historical coordinates in which the Schwarzschild metric is regular over the whole of the extended spacetime are compared and the hypersurfaces of constant coordinate are graphically presented. While the Kruscal form (one of the later forms) is probably the simplest, each of the others has some interesting features.

  13. Energy Materials Coordinating Committee (EMaCC)

    SciTech Connect (OSTI)

    Not Available

    1991-05-31T23:59:59.000Z

    This report summarizes EMaCC activities for fiscal year 1990 and describes the materials research programs of various offices and divisions within the department. The DOE Energy Materials Coordinating Committee (EMaCC) serves primarily to enhance coordination among the Department's materials programs and to further the effective use of materials expertise within the department. (JL)

  14. ECE 3302: Fundamentals of Electrical Engineering Credit / Contact hours: 3 / 3

    E-Print Network [OSTI]

    Gelfond, Michael

    ECE 3302: Fundamentals of Electrical Engineering Credit / Contact hours: 3 / 3 Course coordinator: Mary Baker Textbook(s) and/or other required material: Alexander and Sadiku, Fundamentals of Electric Circuits, 4th Edition, McGraw Gill, 2009. Catalog description: Principles of electric circuits. DC

  15. Operating Reserve Reductions from a Proposed Energy Imbalance Market with Wind and Solar Generation in the Western Interconnection

    SciTech Connect (OSTI)

    King, J.; Kirby, B.; Milligan, M.; Beuning, S.

    2012-05-01T23:59:59.000Z

    This paper considers several alternative forms of an energy imbalance market (EIM) proposed in the nonmarket areas of the Western Interconnection. The proposed EIM includes two changes in operating practices that independently reduce variability and increase access to responsive resources: balancing authority cooperation and sub-hourly dispatch. As the penetration of variable generation increases on the power system, additional interest in coordination would likely occur. Several alternative approaches could be used, but consideration of any form of coordinated unit commitment is beyond the scope of this analysis. This report examines the benefits of several possible EIM implementations--both separately and in concert.

  16. Electrically powered hand tool

    DOE Patents [OSTI]

    Myers, Kurt S.; Reed, Teddy R.

    2007-01-16T23:59:59.000Z

    An electrically powered hand tool is described and which includes a three phase electrical motor having a plurality of poles; an electrical motor drive electrically coupled with the three phase electrical motor; and a source of electrical power which is converted to greater than about 208 volts three-phase and which is electrically coupled with the electrical motor drive.

  17. Case Western Reserve University Chart of Accounts

    E-Print Network [OSTI]

    Rollins, Andrew M.

    Case Western Reserve University Chart of Accounts July 7, 2004 1 SPEEDTYPE / PROJECT PREFIXES Funds PLT Plant CIP Construction in Progress #12;Case Western Reserve University Chart of Accounts July Annual Fund Gift RES Research TRN Training SPC Special Programs/Projects OSA Other Sponsored Activities

  18. Case Western Reserve University Chart of Accounts

    E-Print Network [OSTI]

    Rollins, Andrew M.

    Case Western Reserve University Chart of Accounts July 7, 2004 1 ACCOUNTS 10000 - 199999 Asset of the following: ANN LON CIP OPR CSR OSA END PLT FHB RES INC SPC INS TRN All other SpeedTypes will populate the Account field for you. #12;Case Western Reserve University Chart of Accounts July 7, 2004 2 Asset Accounts

  19. 2011 Annual Report [WESTERN AREA POWER ADMINISTRATION

    SciTech Connect (OSTI)

    none,

    2011-01-01T23:59:59.000Z

    Western’s achievements for 2011 are reported and include: Experienced a banner water year – meaning more hydropower delivered; Changed energy scheduling— to better support intermittent renewable resources; Maintained reliability— ensuring maximum use of the grid by reducing the frequency and duration of planned and unplanned outages; Connected communities— providing customers energy products and related services at cost-based rates; Managed transmission projects.

  20. Western Michigan University Office of Admissions

    E-Print Network [OSTI]

    de Doncker, Elise

    Western Michigan University Office of Admissions 1903 W Michigan Ave Kalamazoo MI 49008-5211 (269 Readmission Office of Admissions 1903 W Michigan Ave Kalamazoo MI 49008-5211 Returning Students (Good Standing __________________________________________________________________________ Date __________________________________ Please return to: Western Michigan University · Office

  1. Regional Lead Agents and County Coordinators 2011 RESPONSIBILITY NAME COUNTY

    E-Print Network [OSTI]

    Bolding, M. Chad

    #12;Regional Lead Agents and County Coordinators 2011 RESPONSIBILITY NAME COUNTY REGION 1 Regional Lead Millie Davenport HGIC County Coordinator Matt Burns Pickens County Coordinator Marty Watt Anderson County Coordinator Morris Warner Oconee REGION 2 Regional Lead Danny Howard Greenville County Coordinator

  2. Report to the Western Water Policy Review Advisory Commission

    E-Print Network [OSTI]

    Selker, John

    Report to the Western Water Policy Review Advisory Commission Western Hydropower Changing Values;Western Hydropower: Changing Values/New Visions Bruce C. Driver Attorney and Consultant With Assistance

  3. Western Employee Presents Wind Award to Minnkota | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Western Employee Presents Wind Award to Minnkota Western Employee Presents Wind Award to Minnkota April 7, 2011 - 2:47pm Addthis Randy Manion Director of Renewable Energy, Western...

  4. Coordinating Permit Offices and the Development of Utility-Scale Geothermal Energy (Presentation)

    SciTech Connect (OSTI)

    Levine, A.; Young, K.; Witherbee, K.

    2013-10-01T23:59:59.000Z

    Permitting is a major component of the geothermal development process. Better coordination across government agencies could reduce uncertainty of the process and the actual time of permitting. This presentation highlights various forms of coordinating permit offices at the state and federal level in the western United States, discusses inefficiencies and mitigation techniques for permitting natural resource projects, analyzes whether various approaches are easily adaptable to utility-scale geothermal development, and addresses advantages and challenges for coordinating permit offices. Key successful strategies identified include: 1. Flexibility in implementing the approach (i.e. less statutory requirements for the approach); 2. Less dependence on a final environmental review for information sharing and permit coordination; 3. State and federal partnerships developed through memorandum of understanding to define roles and share data and/or developer information. A few of the most helpful techniques include: 1. A central point of contact for the developer to ask questions surrounding the project; 2. Pre-application meetings to assist the developer in identifying all of the permits, regulatory approvals, and associated information or data required; 3. A permit schedule or timeline to set expectations for the developer and agencies; 4. Consolidating the public notice, comment, and hearing period into fewer hearings held concurrently.

  5. ELECTRICAL & INFORMATION

    E-Print Network [OSTI]

    Wagner, Stephan

    focuses on. · Smart Grids: Electricity networks are designed to transport energy from where of energy and smarter management of the system. These are called Smart Grids. A number of research projects in medical informatics, smart cities, mining, energy, financial systems, etc. · Bioinformatics

  6. Well-to-wheels analysis of energy use and greenhouse gas emissions of plug-in hybrid electric vehicles.

    SciTech Connect (OSTI)

    Elgowainy, A.; Han, J.; Poch, L.; Wang, M.; Vyas, A.; Mahalik, M.; Rousseau, A.

    2010-06-14T23:59:59.000Z

    Plug-in hybrid electric vehicles (PHEVs) are being developed for mass production by the automotive industry. PHEVs have been touted for their potential to reduce the US transportation sector's dependence on petroleum and cut greenhouse gas (GHG) emissions by (1) using off-peak excess electric generation capacity and (2) increasing vehicles energy efficiency. A well-to-wheels (WTW) analysis - which examines energy use and emissions from primary energy source through vehicle operation - can help researchers better understand the impact of the upstream mix of electricity generation technologies for PHEV recharging, as well as the powertrain technology and fuel sources for PHEVs. For the WTW analysis, Argonne National Laboratory researchers used the Greenhouse gases, Regulated Emissions, and Energy use in Transportation (GREET) model developed by Argonne to compare the WTW energy use and GHG emissions associated with various transportation technologies to those associated with PHEVs. Argonne researchers estimated the fuel economy and electricity use of PHEVs and alternative fuel/vehicle systems by using the Powertrain System Analysis Toolkit (PSAT) model. They examined two PHEV designs: the power-split configuration and the series configuration. The first is a parallel hybrid configuration in which the engine and the electric motor are connected to a single mechanical transmission that incorporates a power-split device that allows for parallel power paths - mechanical and electrical - from the engine to the wheels, allowing the engine and the electric motor to share the power during acceleration. In the second configuration, the engine powers a generator, which charges a battery that is used by the electric motor to propel the vehicle; thus, the engine never directly powers the vehicle's transmission. The power-split configuration was adopted for PHEVs with a 10- and 20-mile electric range because they require frequent use of the engine for acceleration and to provide energy when the battery is depleted, while the series configuration was adopted for PHEVs with a 30- and 40-mile electric range because they rely mostly on electrical power for propulsion. Argonne researchers calculated the equivalent on-road (real-world) fuel economy on the basis of U.S. Environmental Protection Agency miles per gallon (mpg)-based formulas. The reduction in fuel economy attributable to the on-road adjustment formula was capped at 30% for advanced vehicle systems (e.g., PHEVs, fuel cell vehicles [FCVs], hybrid electric vehicles [HEVs], and battery-powered electric vehicles [BEVs]). Simulations for calendar year 2020 with model year 2015 mid-size vehicles were chosen for this analysis to address the implications of PHEVs within a reasonable timeframe after their likely introduction over the next few years. For the WTW analysis, Argonne assumed a PHEV market penetration of 10% by 2020 in order to examine the impact of significant PHEV loading on the utility power sector. Technological improvement with medium uncertainty for each vehicle was also assumed for the analysis. Argonne employed detailed dispatch models to simulate the electric power systems in four major regions of the US: the New England Independent System Operator, the New York Independent System Operator, the State of Illinois, and the Western Electric Coordinating Council. Argonne also evaluated the US average generation mix and renewable generation of electricity for PHEV and BEV recharging scenarios to show the effects of these generation mixes on PHEV WTW results. Argonne's GREET model was designed to examine the WTW energy use and GHG emissions for PHEVs and BEVs, as well as FCVs, regular HEVs, and conventional gasoline internal combustion engine vehicles (ICEVs). WTW results are reported for charge-depleting (CD) operation of PHEVs under different recharging scenarios. The combined WTW results of CD and charge-sustaining (CS) PHEV operations (using the utility factor method) were also examined and reported. According to the utility factor method, the share of vehicle miles trav

  7. Diversification, Coordination Costs and Organizational Rigidity: Evidence from Microdata

    E-Print Network [OSTI]

    Salzman, Daniel

    1 Diversification, Coordination Costs and Organizational Rigidity: Evidence from Microdata First: Diversification, coordination costs, organizational rigidity, productivity #12;2 Diversification, Coordination Costs and Organizational Rigidity: Evidence from Microdata Abstract: This paper examines the impact

  8. Journal of Educational Psychology Applying Grounded Coordination Challenges to Concrete

    E-Print Network [OSTI]

    Journal of Educational Psychology Applying Grounded Coordination Challenges to Concrete Learning, M. I. (2013, August 19). Applying Grounded Coordination Challenges to Concrete Learning Materials.1037/a0034098 #12;Applying Grounded Coordination Challenges to Concrete Learning Materials: A Study

  9. Coordination of General Accounting Office Activities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-06-08T23:59:59.000Z

    The order provides policies, procedures, and responsibilities for the coordination of General Accounting Office activities and actions required when GAO reports contain recommendations pertaining to the DOE. Cancels DOE O 2340.1B.

  10. Clause chaining, switch reference and coordination

    E-Print Network [OSTI]

    Nonato, Rafael

    2014-01-01T23:59:59.000Z

    In this thesis I ponder over a constellation of phenomena that revolve around switch reference and coordination, drawing mainly on their instantiation in Kisedje (Je, Brazil). I start by investigating Klsedje's case system. ...

  11. SPACECRAFT COORDINATION CONTROL USING PID+ BACKSTEPPING

    E-Print Network [OSTI]

    Gravdahl, Jan Tommy

    SPACECRAFT COORDINATION CONTROL USING PID+ BACKSTEPPING Raymond Kristiansen Thomas R. Krogstad a PID+ solution to the problem of relative translational and rotational tracking, using the concept are presented to show the controller performance. Keywords: Spacecraft formation, integrator backstepping, PID

  12. Clean Cities Coalition and Coordinator Awards 2003

    SciTech Connect (OSTI)

    Not Available

    2003-06-01T23:59:59.000Z

    This fact sheet recognizes the 2003 Clean Cities Coalition and Coordinator awards winners and their outstanding efforts to promote alternative fuels and alternative fuel vehicles. The recipients will receive their awards at the Clean Cities Conference in Palm Springs, CA.

  13. Loss of coordination in competitive supply chains

    E-Print Network [OSTI]

    Teo, Koon Soon

    2009-01-01T23:59:59.000Z

    The loss of coordination in supply chains quantifies the inefficiency (i.e. the loss of total profit) due to the presence of competition in the supply chain. In this thesis, we discuss four models: one model with multiple ...

  14. Preparation for upgrading western subbituminous coal

    SciTech Connect (OSTI)

    Grimes, R.W.; Cha, C.Y.; Sheesley, D.C.

    1990-11-01T23:59:59.000Z

    The objective of this project was to establish the physical and chemical characteristics of western coal and determine the best preparation technologies for upgrading this resource. Western coal was characterized as an abundant, easily mineable, clean, low-sulfur coal with low heating value, high moisture, susceptibility to spontaneous ignition, and considerable transit distances from major markets. Project support was provided by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The research was conducted by the Western Research Institute, (WRI) in Laramie, Wyoming. The project scope of work required the completion of four tasks: (1) project planning, (2) literature searches and verbal contacts with consumers and producers of western coal, (3) selection of the best technologies to upgrade western coal, and (4) identification of research needed to develop the best technologies for upgrading western coals. The results of this research suggest that thermal drying is the best technology for upgrading western coals. There is a significant need for further research in areas involving physical and chemical stabilization of the dried coal product. Excessive particle-size degradation and resulting dustiness, moisture reabsorption, and high susceptibility to spontaneous combustion are key areas requiring further research. Improved testing methods for the determination of equilibrium moisture and susceptibility to spontaneous ignition under various ambient conditions are recommended.

  15. Sandia National Laboratories: projected gap between western U...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    projected gap between western U.S. water supply and demand Sandia, the Atlantic Council, and NM Water Resource Research Institute Sponsor Roundtable on Western Water Scarcity On...

  16. THURSDAY: Deputy Secretary of Energy to Visit Western Area Power...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    THURSDAY: Deputy Secretary of Energy to Visit Western Area Power Administration Transmission Substation THURSDAY: Deputy Secretary of Energy to Visit Western Area Power...

  17. Energy Efficiency in Western Utility Resource Plans Implications...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Western Utility Resource Plans Implications for Regional Assessments and Initiatives Energy Efficiency in Western Utility Resource Plans Implications for Regional Assessments...

  18. Electrical and Computer Engineering Electrical Engineering

    E-Print Network [OSTI]

    Heller, Barbara

    Electrical and Computer Engineering Electrical Engineering Department Website: www.iit.edu/engineering/ece Electrical engineering is concerned with the generation, transmission, and utilization of electrical energy and with the transmitting and processing of information. Electrical engineers are involved in the analysis, design, and pro

  19. Beyond the Active Site: The Impact of the Outer Coordination...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Active Site: The Impact of the Outer Coordination Sphere on Electrocatalysts for Hydrogen Production and Oxidation. Beyond the Active Site: The Impact of the Outer Coordination...

  20. Fuel Cell Transit Bus Coordination and Evaluation Plan California...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bus Coordination and Evaluation Plan California Fuel Cell Transit Evaluation Team Fuel Cell Transit Bus Coordination and Evaluation Plan California Fuel Cell Transit Evaluation...

  1. Coordination of Care in Substance Abuse Treatment: An Interorganizational Perspective

    E-Print Network [OSTI]

    Spear, Suzanne Evelyn

    2012-01-01T23:59:59.000Z

    substance abuse treatment under the Affordable Care Act.Coordination of Care in Substance Abuse Treatment: AnCoordination of Care in Substance Abuse Treatment: An

  2. Energy Saver Heroes: Clean Cities Coordinators | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Energy Saver Heroes: Clean Cities Coordinators Energy Saver Heroes: Clean Cities Coordinators April 2, 2009 - 3:32pm Addthis Shannon Brescher Shea Communications Manager, Clean...

  3. Innovation and Coordination at the Callifornia Fuel Cell Partnership...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Innovation and Coordination at the Callifornia Fuel Cell Partnership Innovation and Coordination at the Callifornia Fuel Cell Partnership Presented at Refueling Infrastructure for...

  4. DOE Releases EPRI Report on Benefits of Regional Coordination...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Releases EPRI Report on Benefits of Regional Coordination in Wind Energy Transfers DOE Releases EPRI Report on Benefits of Regional Coordination in Wind Energy Transfers February...

  5. Spin transition in a four-coordinate iron oxide

    SciTech Connect (OSTI)

    Kawakami, T. [Nihon University, Tokyo; Sutou, S. [Nihon University, Tokyo; Hirama, H. [Nihon University, Tokyo; Sekiya, Y. [Nihon University, Tokyo; Makino, T. [Nihon University, Tokyo; Tsujimoto, Y. [Kyoto University, Japan; Kitada, A. [Kyoto University, Japan; Tassel, C. [Kyoto University, Japan; Kageyama, H. [Kyoto University, Japan; Yoshimura, K. [Kyoto University, Japan; Chen, Xingqiu [ORNL; Fu, Chong Long [ORNL; Okada, T. [University of Tokyo, Tokyo, Japan; Yagi, T. [University of Tokyo, Tokyo, Japan; Hayashi, N. [Kyoto University, Japan; Nasu, S. [Osaka University; Podloucky, R. [Institut fur Physikalische Chemie der RWTH; Takano, M. [Kyoto University, Japan

    2009-01-01T23:59:59.000Z

    The spin transition, or spin crossover, is a manifestation of electronic instability induced by external constraints such as pressure1. Among known examples that exhibit spin transition, 3d ions with d6 electron configurations represent the vast majority, but the spin transition observed thus far has been almost exclusively limited to that between high-spin (S = 2) and low-spin (S = 0) states2-9. Here we report a novel high-spin to intermediate-spin (S = 1) state transition at 33 GPa induced by pressurization of an antiferromagnetic insulator SrFeO2 with a square planar coordination10. The change in spin multiplicity brings to ferromagnetism as well as metallicity, yet keeping the ordering temperature far above ambient. First-principles calculations attribute the origin of the transition to the strong inlayer hybridization between Fe dx 2 -y 2 O p , leading to a pressure-induced electronic instability toward the depopulation of Fe dx 2 -y 2 O p antibonding states. Furthermore, the ferromagnetic S = 1 state is half-metallic due to the inception of half-occupied spin-down (dxz, dyz) degenerate states upon spin transition. These results highlight the square-planar coordinated iron oxides as a new class of magnetic and electric materials and provide new avenues toward realizing multi-functional sensors and data-storage devices.

  6. High-resolution modeling of the western North American power system demonstrates low-cost and low-carbon futures

    E-Print Network [OSTI]

    Kammen, Daniel M.

    electric power system models primarily address either day-to-day operation or long-term capacity planningHigh-resolution modeling of the western North American power system demonstrates low-cost and low greenhouse gas emissions. Exploiting intermittent renewable energy resources demands power system planning

  7. EIS-0182: Western Area Power Administration Energy Planning and Management Program

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration (WAPA) prepared this environmental impact statement to analyze the environmental impacts of its proposal to establish an Energy Planning and Management Program to replace its Guidelines and Acceptance Criteria for the Conservation and Renewable Energy Program and to evaluate ways to make future resource commitments to existing customers. If adopted, the proposed management program would require WAPA's long-term firm customers to implement long-term energy planning to help enhance efficient electric energy use.

  8. Capacity Markets for Electricity

    E-Print Network [OSTI]

    Creti, Anna; Fabra, Natalia

    2004-01-01T23:59:59.000Z

    Designing Markets for Electricity. Wiley IEEE Press. [25]in the England and Wales Electricity Market”, Power WorkingFelder (1996), “Should Electricity Markets Have a Capacity

  9. Retail Electricity Competition

    E-Print Network [OSTI]

    Joskow, Paul; Tirole, Jean

    2004-01-01T23:59:59.000Z

    Reliability and Competitive Electricity Markets” mimeo, MITCSEM WP 130 Retail Electricity Competition * Paul Joskow andwww.ucei.org Retail Electricity Competition ? Paul Joskow †

  10. Designing Electricity Auctions

    E-Print Network [OSTI]

    Fabra, Natalia; von der Fehr, Nils-Henrik; Harbord, David

    2004-01-01T23:59:59.000Z

    market performance in electricity auctions, it appears thatMcSorely (2001) “Regulating Electricity Markets: Experiencethe United Kingdom,” The Electricity Journal, December, 81-

  11. High Temperatures & Electricity Demand

    E-Print Network [OSTI]

    High Temperatures & Electricity Demand An Assessment of Supply Adequacy in California Trends.......................................................................................................1 HIGH TEMPERATURES AND ELECTRICITY DEMAND.....................................................................................................................7 SECTION I: HIGH TEMPERATURES AND ELECTRICITY DEMAND ..........................9 BACKGROUND

  12. Western Wind and Solar Integration Study Phase 2 (Presentation)

    SciTech Connect (OSTI)

    Lew, D.; Brinkman, G.; Ibanez, E.; Kumar, N.; Lefton, S.; Jordan, G.; Venkataraman, S.; King, J.

    2013-06-01T23:59:59.000Z

    This presentation accompanies Phase 2 of the Western Wind and Solar Integration Study, a follow-on to Phase 1, which examined the operational impacts of high penetrations of variable renewable generation on the electric power system in the West and was one of the largest variable generation studies to date. High penetrations of variable generation can induce cycling of fossil-fueled generators. Cycling leads to wear-and-tear costs and changes in emissions. Phase 2 calculated these costs and emissions, and simulated grid operations for a year to investigate the detailed impact of variable generation on the fossil-fueled fleet. The presentation highlights the scope of the study and results.

  13. The Western Wind and Solar Integration Study Phase 2

    SciTech Connect (OSTI)

    Lew, D.; Brinkman, G.; Ibanez, E.; Hodge, B. M.; Hummon, M.; Florita, A.; Heaney, M.

    2013-09-01T23:59:59.000Z

    The electric grid is a highly complex, interconnected machine, and changing one part of the grid can have consequences elsewhere. Adding wind and solar affects the operation of the other power plants and adding high penetrations can induce cycling of fossil-fueled generators. Cycling leads to wear-and-tear costs and changes in emissions. Phase 2 of the Western Wind and Solar Integration Study (WWSIS-2) evaluated these costs and emissions and simulated grid operations for a year to investigate the detailed impact of wind and solar on the fossil-fueled fleet. This built on Phase 1, one of the largest wind and solar integration studies ever conducted, which examined operational impacts of high wind and solar penetrations in the West.

  14. Sierra Nevada Region - Western Area Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Sierra Nevada Region is one of five offices in the Western Area Power Administration. SN markets power in northern and central California, and portions of Nevada, to wholesale...

  15. Competitive interstate taxation of western coal

    SciTech Connect (OSTI)

    Kolstad, C.D.; Wolak, F.A. Jr.

    1983-01-01T23:59:59.000Z

    This paper analyzes the potential market power of western states in setting coal severance taxes. An attempt to determine the emphasis placed by the western states on the development of their coal resources is also made. Three market structures are analyzed. One involves a western regional cartel, setting taxes collectively. The other cases are noncooperative tax equilibria with Montana and Wyoming competing against each other. We study the effects on these equilibria of changes in each region's relative emphasis on development of coal resources vs tax revenue. The welfare impacts of these tax setting policies are also addressed. The analysis is based on an activity analysis of US coal markets. The results show that the taxes associated with the noncooperative competitive tax equilibria are close to present tax levels. Additionally, we conclude that western states currently are quite efficient extractors of economic rent from coal produced within their boundaries, in terms of welfare loss per dollar of tax revenue collected. 2 figures.

  16. Illinois Municipal Electric Agency- Electric Efficiency Program

    Broader source: Energy.gov [DOE]

    The Illinois Municipal Electric Agency (IMEA) offers rebates to member municipal utilities* (those who purchase wholesale electric service from IMEA) and retail customers for energy efficiency...

  17. Boom & Bust in Power Plant Construction: Lessons from the California Electricity Crisis

    E-Print Network [OSTI]

    Ford, Andrew

    1 Boom & Bust in Power Plant Construction: Lessons from the California Electricity Crisis To Appear in the previous year, and natural gas prices fell dramatically. New power plants came on line, and many more how boom and bust might appear in the western electricity system using computer simulation

  18. ELECTRICAL ENGINEERING EECS Department

    E-Print Network [OSTI]

    ELECTRICAL ENGINEERING EECS Department The Electrical Engineering and Computer Science (EECS) Department at WSU offers undergraduate degrees in electrical engineering, computer engineering and computer science. The EECS Department offers master of science degrees in computer science, electrical engineering

  19. Electric car Gasoline car

    E-Print Network [OSTI]

    ENAC/ Electric car (Renault) Gasoline car (competitors) Gasoline car (Renault) Market shares of an electric vehicle? Electric car (Renault) Gasoline car (competitors) Gasoline car (Renault) Market shares preferences. · Identification of population segments with a strong interest for electric cars. · Forecasting

  20. Low cation coordination in oxide melts

    SciTech Connect (OSTI)

    Skinner, Lawrie [State University of New York, Stony Brook] [State University of New York, Stony Brook; Benmore, Chris J [Argonne National Laboratory (ANL)] [Argonne National Laboratory (ANL); Du, Jincheng [University of North Texas] [University of North Texas; Weber, Richard [Argonne National Laboratory (ANL)] [Argonne National Laboratory (ANL); Neuefeind, Joerg C [ORNL] [ORNL; Tumber, Sonia [Materials Development, Inc., Evanston, IL] [Materials Development, Inc., Evanston, IL; Parise, John B [Stony Brook University (SUNY)] [Stony Brook University (SUNY)

    2014-01-01T23:59:59.000Z

    The complete set of Faber-Ziman partial pair distribution functions for a rare earth oxide liquid were measured for the first time by combining aerodynamic levitation, neutron diffraction, high energy x-ray diffraction and isomorphic substitution using Y2 O3 and Ho2 O3 melts. The average Y- O coordination is measured to be 5.5(2), which is significantly less than the octahedral coordination of crystalline Y2 O3 (or Ho2 O3 ). Investigation of high temperature La2 O3 , ZrO2 , SiO2 , and Al2 O3 melts by x-ray diffraction and molecular dynamics simulations also show lower-than-crystal cation- oxygen coordination. These measurements suggest a general trend towards lower M-O coordination compared to their crystalline counterparts. It is found that this coordination number drop is larger for lower field strength, larger radius cations and is negligible for high field strength (network forming) cations. These findings have broad implications for predicting the local structure and related physical properties of metal-oxide melts and oxide glasses.

  1. Coordination and Efficiency in Decentralized Collaboration

    E-Print Network [OSTI]

    Romero, Daniel M; Kleinberg, Jon

    2015-01-01T23:59:59.000Z

    Environments for decentralized on-line collaboration are now widespread on the Web, underpinning open-source efforts, knowledge creation sites including Wikipedia, and other experiments in joint production. When a distributed group works together in such a setting, the mechanisms they use for coordination can play an important role in the effectiveness of the group's performance. Here we consider the trade-offs inherent in coordination in these on-line settings, balancing the benefits to collaboration with the cost in effort that could be spent in other ways. We consider two diverse domains that each contain a wide range of collaborations taking place simultaneously -- Wikipedia and GitHub -- allowing us to study how coordination varies across different projects. We analyze trade-offs in coordination along two main dimensions, finding similar effects in both our domains of study: first we show that, in aggregate, high-status projects on these sites manage the coordination trade-off at a different level than t...

  2. NREL Variability Analysis for the Western Interconnect (Presentation)

    SciTech Connect (OSTI)

    Milligan, M.; Kirby, B.; King, J.

    2011-07-01T23:59:59.000Z

    This presentation investigates the effects of several Energy Imbalance Markets implementations in the Western Interconnect.

  3. The Siwaliks of western Nepal I. Geometry and kinematics

    E-Print Network [OSTI]

    Husson, Laurent

    The Siwaliks of western Nepal I. Geometry and kinematics J.L. Mugniera, *, P. Leturmya , G. Masclea-western Nepal, and beneath 14.6 Ma sediments in mid-western Nepal, i.e., above the base of the Siwalik Group. Unconformities have been observed in the upper Siwalik member of western Nepal both on satellite images

  4. DOE-TSPP-06; Coordination of DOE Technical Standard

    Broader source: Energy.gov (indexed) [DOE]

    5 2.1.6 Coordination of Technical Qualification Standards and Information Architecture Standards......

  5. Interagency Geothermal Coordinating Council fifth annual report. Final draft

    SciTech Connect (OSTI)

    Abel, Fred H.

    1981-07-07T23:59:59.000Z

    Geothermal energy is the natural heat of the earth, and can be tapped as a clean, safe, economical alternative source of energy. Much of the geothermal energy resource is recoverable with current or near-current technology and could make a significant contribution both to increasing domestic energy supplies and to reducing the US dependence on imported oil. Geothermal energy can be used for electric power production, residential and commercial space heating and cooling, industrial process heat, and agricultural process applications. This report describes the progress for fiscal year 1980 (FY80) of the Federal Geothermal Program. It also summarizes the goals, strategy, and plans which form the basis for the FY81 and FY82 program activities and reflects the recent change in national policy affecting Federal research, development and demonstration programs. The Interagency Geothermal Coordinating Council (IGCC) believes that substantial progress can and will be made in the development of geothermal energy. The IGCC goals are: (1) reduce the institutional barriers so that geothermal projects can be on-line in one-half the current time; (2) make moderate temperature resources an economically competitive source of electricity; (3) remove the backlog of noncompetitive lease applications; (4) competitive lease all KGRA lands; and (5) cut the cost of hydrothermal technology by 25%.

  6. Electrical receptacle

    DOE Patents [OSTI]

    Leong, R.

    1993-06-22T23:59:59.000Z

    The invention is a receptacle for a three prong electrical plug which has either a tubular or U-shaped grounding prong. The inventive receptacle has a grounding prong socket which is sufficiently spacious to prevent the socket from significantly stretching when a larger, U-shaped grounding prong is inserted into the socket, and having two ridges to allow a snug fit when a smaller tubular shape grounding prong is inserted into the socket. The two ridges are made to prevent the socket from expanding when either the U-shaped grounding prong or the tubular grounding prong is inserted.

  7. Policy Network Approach to Coordinated Disaster Response

    E-Print Network [OSTI]

    Kim, Kwang Deok

    2013-01-01T23:59:59.000Z

    In this paper, we explore the formation of network relationships among disaster relief agencies during the process of responding to an unexpected event. The relationship is investigated through variables derived from the policy network theory, and four cases from three developed countries such as (i) Hurricane Katrina in the US; (ii) Typhoon Maemi in South Korea; (iii) Kobe; and, (iv) Tohoku Earthquake in Japan that failed to cope with extreme events forms the basis for case study presented here. We argue that structural characteristics of multi-jurisdictional coordination may facilitate or impede in responding to a complex nature of recent disaster. We further highlight the promise of policy network approach in facilitating the development of multi-jurisdictional coordination process which may provide new avenue to improve the communication and coordination of hierarchical command control driven organizations with the local community. Our proposed novel approach in investigating the usefulness of network app...

  8. Coordination of Energy Efficiency and Demand Response

    E-Print Network [OSTI]

    Goldman, Charles

    2010-01-01T23:59:59.000Z

    natural gas and electricity—is one of the most constructive, cost-effective ways to address the challenges of high energy prices, energy security

  9. Coordination of Energy Efficiency and Demand Response

    E-Print Network [OSTI]

    Goldman, Charles

    2010-01-01T23:59:59.000Z

    and D. Kathan (2009). Demand Response in U.S. ElectricityEnergy Financial Group. Demand Response Research Center [2008). Assessment of Demand Response and Advanced Metering.

  10. Thermodynamics, Optical Properties and Coordination Modes of Np(V) with Dipicolinic Acid

    E-Print Network [OSTI]

    Tian, Guoxin

    2010-01-01T23:59:59.000Z

    Thermodynamics, Optical Properties and Coordination Modes ofacid, complexation, thermodynamics, coordination mode 1.

  11. Residence Coordinator Agreement Concerning University Provided Housing

    E-Print Network [OSTI]

    Howitt, Ivan

    Residence Coordinator Agreement Concerning University Provided Housing I understand-campus apartments and provides such housing. My acceptance of employment also constitutes my agreement to the following terms related to housing provided to me by the University: 1. I agree to make no substantial

  12. Modeling Resources for Activity Coordination and Scheduling

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    Modeling Resources for Activity Coordination and Scheduling Rodion M. Podorozhny , Barbara Staudt describes experience in applying a resource man- agement system to problems in two areas of agent and activity coordi- nation. In the paper we argue that precise speci cation of resources is important

  13. Modeling Resources for Activity Coordination and Scheduling

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    Modeling Resources for Activity Coordination and Scheduling Rodion M. Podorozhny , Barbara Staudt describes experience in applying a resource man­ agement system to problems in two areas of agent and activity coordi­ nation. In the paper we argue that precise specification of resources is important

  14. Southern Region Water Quality Coordination Project

    E-Print Network [OSTI]

    an existing collaborative process through which new and existing technologies and management systems Committee (SRWQPC) promotes the development and delivery of effective management systems that can be adaptedSouthern Region Water Quality Coordination Project September 14, 2004 to June 1, 2005 Progress

  15. Coordinating and Motivating open source contributors

    E-Print Network [OSTI]

    Crowston, Kevin

    Coordinating and Motivating open source contributors Workshop @ LinuxWorldAsia James Howison School Science at University of New South Wales 4th year of my PhD at Syracuse University Prof. Crowston Interviews, surveys and studies of development archives ApacheCon, O'Reilly OSCon, FOOCamp, OSDC

  16. Coordinated Management: Power, Performance, Energy, and Temperature

    E-Print Network [OSTI]

    Keckler, Stephen W.

    Coordinated Management: Power, Performance, Energy, and Temperature Heather Hanson Stephen W and energy lim- its" and enable a coherent set of management mechanisms to achieve the goal. The closed at Austin IBM Technical Contact : Rob Bell, Jr. Abstract We are developing a next-generation power manager

  17. Quantum mechanics with coordinate dependent noncommutativity

    SciTech Connect (OSTI)

    Kupriyanov, V. G. [CMCC, Universidade Federal do ABC, Santo André, SP (Brazil)] [CMCC, Universidade Federal do ABC, Santo André, SP (Brazil)

    2013-11-15T23:59:59.000Z

    Noncommutative quantum mechanics can be considered as a first step in the construction of quantum field theory on noncommutative spaces of generic form, when the commutator between coordinates is a function of these coordinates. In this paper we discuss the mathematical framework of such a theory. The noncommutativity is treated as an external antisymmetric field satisfying the Jacobi identity. First, we propose a symplectic realization of a given Poisson manifold and construct the Darboux coordinates on the obtained symplectic manifold. Then we define the star product on a Poisson manifold and obtain the expression for the trace functional. The above ingredients are used to formulate a nonrelativistic quantum mechanics on noncommutative spaces of general form. All considered constructions are obtained as a formal series in the parameter of noncommutativity. In particular, the complete algebra of commutation relations between coordinates and conjugated momenta is a deformation of the standard Heisenberg algebra. As examples we consider a free particle and an isotropic harmonic oscillator on the rotational invariant noncommutative space.

  18. February 2012 Facilities Coordinator's Group Meeting

    E-Print Network [OSTI]

    Mullins, Dyche

    on reliability and repair cost · FM ability to identify on-going funding (potentially $100k per year) · Value to develop next steps · Equipment input needed from Facility Coordinator's if the Environmental Room doesn · Replacement of equipment #12;3 FM Customer Service & Quality Initiative 10 Point Plan February 2012 - updated

  19. Electrical Engineer (Field Engineering)

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Sierra Nevada Region Maintenance Engineering N5500 114 Parkshore Drive Folsom, CA...

  20. IRRIGATION & ELECTRICAL DISTRICTS

    Broader source: Energy.gov (indexed) [DOE]

    this authority and meeting the requirements of Western's Open Access Transmission Tariff (OATT) under the Federal Power Act. The nature and extent of these potential conflicts...

  1. 2012 National Electricity Forum

    Broader source: Energy.gov (indexed) [DOE]

    as that done for the Western Renewable Energy Zones project, the designation of energy corridors on federal lands under section 368 of the Energy Policy Act (2005), the...

  2. 2012 Annual Report [WESTERN AREA POWER ADMINISTRATION

    SciTech Connect (OSTI)

    none,

    2012-01-01T23:59:59.000Z

    Fiscal Year 2012 brought some tumultuous and uncertain times to Western. The utility industry and technology continued to evolve, and the demand for constant flow of power and transmission system reliability continued to increase. Western kept pace by continuing to deliver reliable, cost-based hydropower while reviewing and updating business practices that took into account how the energy industry is evolving. During this time of exponential change, Western tackled many challenges, including: Reviewing the Transmission Infrastructure Program processes and procedures; Responding to Secretary of Energy Steven Chu’s memorandum to create a modern, efficient and reliable transmission grid; Weathering record-breaking natural disasters in our service territory; Completing our role in TIP’s flagship project—the Montana Alberta Tie Ltd. transmission line; Incorporating new, far-reaching regulations and industry trends.

  3. Flathead River Focus Watershed Coordinator, 2005-2006 Annual Report.

    SciTech Connect (OSTI)

    DuCharme, Lynn (Confederated Salish and Kootenai Tribes of the Flathead Nation, Pablo, MT)

    2006-05-01T23:59:59.000Z

    The Bonneville Power Administration (BPA) has long been involved with funding of the Cooperative Habitat Protection and Improvement with Private Landowners program in accordance with the Northwest Power Planning Council's (NPPC) Fish & Wildlife Program (Section 7.7). Section 7.7B.1 requires the establishment of ''at least one model watershed coordinator selected by each representative state''. This project was initiated in 1997 with the purpose of fulfilling the NWPCC's watershed program within the Flathead River basin in western Montana. Currently, the Flathead watershed has been radically altered by hydropower and other land uses. With the construction of Hungry Horse, Bigfork and Kerr dams, the Flathead River system has been divided into isolated populations. Bull trout have been listed as threatened by the US Fish and Wildlife Service and westslope cutthroat trout have been petitioned for listing. Many streams in the drainage have been destabilized during recent decades. Past legal and illegal species introductions are also causing problems. This project fosters in-kind, out-of-place mitigation to offset the impacts of hydroelectric power to 72 miles of the South Fork of the Flathead River and its tributaries upstream of Hungry Horse Dam. Key subbasins within the Flathead drainage, which are critical to native species restoration, are experiencing rapid changes in land ownership and management direction. Subdivision and residential development of agricultural and timber lands adjacent to waterways in the drainage pose one of the greatest threats to weak but recoverable stocks of trout species. Plum Creek Timber Company, a major landholder in the Flathead drainage is currently divesting itself of large tracks of its lakeshore and streamside holdings. Growth of small tract development throughout the area and its tributaries is occurring at a record rate. Immediate to short-term action is required to protect stream corridors through many of these areas if cost-effective recovery efforts are to be implemented. In order to adequately address the issues, other segments of society and other (non-BPA) funding sources must be incorporated into the solution. As stated in the 1994 Fish and Wildlife Program (section 7.7), ''Comprehensive watershed management should enhance and expedite implementation of actions by clearly identifying gaps in programs and knowledge, by striving over time to resolve conflicts, and by keying on activities that address priorities''. A watershed coordinator helps to initiate and facilitate efforts for addressing the issues mentioned above and pulling together a plan for mitigation. Local support is essential before local governments and individual citizens are going to allow government initiatives to be implemented.

  4. Flathead River Focus Watershed Coordinator, 2002 Annual Report.

    SciTech Connect (OSTI)

    DuCharme, Lynn (Confederated Salish and Kootenai Tribes of the Flathead Nation, Pablo, MT)

    2003-04-01T23:59:59.000Z

    The Bonneville Power Administration (BPA) has long been involved with funding of the Cooperative Habitat Protection and Improvement with Private Landowners program in accordance with the Northwest Power Planning Council's (NPPC) Fish & Wildlife Program (Section 7.7). Section 7.7B.1 requires the establishment of ''at least one model watershed coordinator selected by each representative state''. This project was initiated in 1997 with the purpose of fulfilling the NPPC's watershed program within the Flathead River basin in western Montana. Currently, the Flathead watershed has been radically altered by hydropower and other land uses. With the construction of Hungry Horse, Bigfork and Kerr dams, the Flathead River system has been divided into isolated populations. Bull trout have been listed as threatened by the US Fish and Wildlife Service and westslope cutthroat trout have been petitioned for listing. Many streams in the drainage have been destabilized during recent decades. Past legal and illegal species introductions are also causing problems. This project fosters in-kind, out-of-place mitigation to offset the impacts of hydroelectric power to 72 miles of the South Fork of the Flathead River and its tributaries upstream of Hungry Horse Dam. Key subbasins within the Flathead drainage, which are critical to native species restoration, are experiencing rapid changes in land ownership and management direction. Subdivision and residential development of agricultural and timber lands adjacent to waterways in the drainage pose one of the greatest threats to weak but recoverable stocks of trout species. Plum Creek Timber Company, a major landholder in the Flathead drainage is currently divesting itself of large tracks of its lakeshore and streamside holdings. Growth of small tract development throughout the area and its tributaries is occurring at a record rate. Immediate to short-term action is required to protect stream corridors through many of these areas if cost-effective recovery efforts are to be implemented. In order to adequately address the issues, other segments of society and other (non-BPA) funding sources must be incorporated into the solution. As stated in the 1994 Fish and Wildlife Program (section 7.7), ''Comprehensive watershed management should enhance and expedite implementation of actions by clearly identifying gaps in programs and knowledge, by striving over time to resolve conflicts, and by keying on activities that address priorities''. A watershed coordinator helps to initiate and facilitate efforts for addressing the issues mentioned above and pulling together a plan for mitigation. Local support is essential before local governments and individual citizens are going to allow government initiatives to be implemented.

  5. Flathead River Focus Watershed Coordinator, 2004-2005 Annual Report.

    SciTech Connect (OSTI)

    DuCharme, Lynn (Confederated Salish and Kootenai Tribes of the Flathead Nation, Pablo, MT)

    2006-06-26T23:59:59.000Z

    The Bonneville Power Administration (BPA) has long been involved with funding of the Cooperative Habitat Protection and Improvement with Private Landowners program in accordance with the Northwest Power Planning Council's (NPPC) Fish & Wildlife Program (Section 7.7). Section 7.7B.1 requires the establishment of ''at least one model watershed coordinator selected by each representative state''. This project was initiated in 1997 with the purpose of fulfilling the NWPCC's watershed program within the Flathead River basin in western Montana. Currently, the Flathead watershed has been radically altered by hydropower and other land uses. With the construction of Hungry Horse, Bigfork and Kerr dams, the Flathead River system has been divided into isolated populations. Bull trout have been listed as threatened by the US Fish and Wildlife Service and westslope cutthroat trout have been petitioned for listing. Many streams in the drainage have been destabilized during recent decades. Past legal and illegal species introductions are also causing problems. This project fosters in-kind, out-of-place mitigation to offset the impacts of hydroelectric power to 72 miles of the South Fork of the Flathead River and its tributaries upstream of Hungry Horse Dam. Key subbasins within the Flathead drainage, which are critical to native species restoration, are experiencing rapid changes in land ownership and management direction. Subdivision and residential development of agricultural and timber lands adjacent to waterways in the drainage pose one of the greatest threats to weak but recoverable stocks of trout species. Plum Creek Timber Company, a major landholder in the Flathead drainage is currently divesting itself of large tracks of its lakeshore and streamside holdings. Growth of small tract development throughout the area and its tributaries is occurring at a record rate. Immediate to short-term action is required to protect stream corridors through many of these areas if cost-effective recovery efforts are to be implemented. In order to adequately address the issues, other segments of society and other (non-BPA) funding sources must be incorporated into the solution. As stated in the 1994 Fish and Wildlife Program (section 7.7), ''Comprehensive watershed management should enhance and expedite implementation of actions by clearly identifying gaps in programs and knowledge, by striving over time to resolve conflicts, and by keying on activities that address priorities''. A watershed coordinator helps to initiate and facilitate efforts for addressing the issues mentioned above and pulling together a plan for mitigation. Local support is essential before local governments and individual citizens are going to allow government initiatives to be implemented.

  6. Flathead River Focus Watershed Coordinator, 2003-2004 Annual Report.

    SciTech Connect (OSTI)

    DuCharme, Lynn (Confederated Salish and Kootenai Tribes of the Flathead Nation, Pablo, MT)

    2004-06-01T23:59:59.000Z

    The Bonneville Power Administration (BPA) has long been involved with funding of the Cooperative Habitat Protection and Improvement with Private Landowners program in accordance with the Northwest Power Planning Council's (NPPC) Fish & Wildlife Program (Section 7.7). Section 7.7B.1 requires the establishment of ''at least one model watershed coordinator selected by each representative state''. This project was initiated in 1997 with the purpose of fulfilling the NWPCC's watershed program within the Flathead River basin in western Montana. Currently, the Flathead watershed has been radically altered by hydropower and other land uses. With the construction of Hungry Horse, Bigfork and Kerr dams, the Flathead River system has been divided into isolated populations. Bull trout have been listed as threatened by the US Fish and Wildlife Service and westslope cutthroat trout have been petitioned for listing. Many streams in the drainage have been destabilized during recent decades. Past legal and illegal species introductions are also causing problems. This project fosters in-kind, out-of-place mitigation to offset the impacts of hydroelectric power to 72 miles of the South Fork of the Flathead River and its tributaries upstream of Hungry Horse Dam. Key subbasins within the Flathead drainage, which are critical to native species restoration, are experiencing rapid changes in land ownership and management direction. Subdivision and residential development of agricultural and timber lands adjacent to waterways in the drainage pose one of the greatest threats to weak but recoverable stocks of trout species. Plum Creek Timber Company, a major landholder in the Flathead drainage is currently divesting itself of large tracks of its lakeshore and streamside holdings. Growth of small tract development throughout the area and its tributaries is occurring at a record rate. Immediate to short-term action is required to protect stream corridors through many of these areas if cost-effective recovery efforts are to be implemented. In order to adequately address the issues, other segments of society and other (non-BPA) funding sources must be incorporated into the solution. As stated in the 1994 Fish and Wildlife Program (section 7.7), ''Comprehensive watershed management should enhance and expedite implementation of actions by clearly identifying gaps in programs and knowledge, by striving over time to resolve conflicts, and by keying on activities that address priorities''. A watershed coordinator helps to initiate and facilitate efforts for addressing the issues mentioned above and pulling together a plan for mitigation. Local support is essential before local governments and individual citizens are going to allow government initiatives to be implemented.

  7. Western Power Corporation | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit withTianlin BaxinUmweltVillageGraphWellton-MohawkWestern Iowa Power CoopWestern

  8. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    SciTech Connect (OSTI)

    Mills, Andrew D.; Phadke, Amol A.; Wiser, Ryan H.

    2010-06-10T23:59:59.000Z

    The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this paper we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33percent of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33percent RE target across nearly all scenarios analyzed (38-65percent). Solar energy is almost always the second largest source (14-41percent). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Further, we find that even with total transmission expenditures of $17-34 billion these costs still represent just 10-19percent of the total delivered cost of renewable energy.

  9. Southeastern Electric- Electric Equipment Loan Program

    Broader source: Energy.gov [DOE]

    Southeastern Electric Cooperative is a member-owned electric cooperative that serves customers in the southeastern part of South Dakota. Southeastern offers a loan program for customers who want...

  10. THE UNIVERSITY OF WESTERN ONTARIO HUMAN RESOURCES

    E-Print Network [OSTI]

    Cunningham, Ian

    Compatibility 6 6.0 Organic Solvents 7 7.0 Unknown Chemicals 7 8.0 Controlled Substances and Goods 7 9.0 Shock Chemical Glass Containers 15 13.0 Asbestos 16 14.0 Electronics, Fluorescent Light Bulbs 16 15.0 Sharps the requirements covered in this handbook. The waste disposal program at Western is convenient, flexible, and easy

  11. Western University Nuclear Radiation Safety Inspection Checklist

    E-Print Network [OSTI]

    Sinnamon, Gordon J.

    May 2012 Western University Nuclear Radiation Safety Inspection Checklist Permit Holder to nuclear substances or radiation devices is restricted to authorized radiation users listed on the permit radiation labs whenever unsealed nuclear substances are used in these designated locations. 1.7(d

  12. First Western Forum on Energy & Water Sustainability

    E-Print Network [OSTI]

    Keller, Arturo A.

    First Western Forum on Energy & Water Sustainability March 22, 2007 WATER PLAN: 2000-2050 CITY;Tucson Active Management Area Tucson Active Management Area City of Tucson Tucson Active Management Area-2000 Tucson Active Management Area #12;City of Tucson 1940 #12;City of Tucson 1945 #12;City of Tucson 1950 #12

  13. Regional Summary Western Pacific Management Context

    E-Print Network [OSTI]

    -central and eastern Pacific Ocean) total of Pacific bigeye tuna landings reported in 2009. Currently (WCPFC) is active in the western and central Pacific Ocean and the Inter-American Tropical Tuna Commission (IATTC) is active in the eastern Pacific Ocean. Species under the purview of the WCPFC and IATTC

  14. WWU Sustainability Academy Western Washington University

    E-Print Network [OSTI]

    Zaferatos, Nicholas C.

    WWU Sustainability Academy Western Washington University Dear colleagues, We cordially extend to you this invitation to join the WWU Sustainability Academy! Following several years of discussion, a group of faculty has started the (tentatively named) "WWU Sustainability Academy." Our goal is to build

  15. Food Security in the Western US

    E-Print Network [OSTI]

    Food Security in the Western US and Pacific Territories 23 Rural Connections Nov. 2009 By PeteR BaRcinas ADAP is tackling the food security implications of climate change, rising sea levels, and fuel costs Pacific (aDaP) Regional Food security and Sufficiency Project brings together community, local, state

  16. ANNUAL REPORT WESTERN COOLING EFFICIENCY CENTER

    E-Print Network [OSTI]

    California at Davis, University of

    Sinks for Unitary Air Conditioners 10 Graywater Reuse for Evaporative Cooling 14 In-Home Energy Display COOLING EFFICIENCY CENTER WESTERN COOLING EFFICIENCY CENTER EXPLORING MANY OPTIONS FOR ENERGY EFFICIENCY and leadership in the field of energy efficiency. This document, the second Annual Report on Cooling in the West

  17. 2010 Western Pacific Geophysics Search Results

    E-Print Network [OSTI]

    Ng, Chung-Sang

    2010 Western Pacific Geophysics Meeting Search Results Cite abstracts as Author(s) (2010), Title: Geophysical Institute, University of Alaska Fairbanks, Fairbanks, AK, United States AU: Ragunathan, S EM: srivatta@gi.alaska.edu AF: Geophysical Institute, University of Alaska Fairbanks, Fairbanks, AK, United

  18. Fracking in western Maryland Johan Schijf

    E-Print Network [OSTI]

    Boynton, Walter R.

    Fracking in western Maryland Johan Schijf Chesapeake Biological Laboratory University of Maryland Center for Environmental Science #12;This seminar will consist of three parts: I. What is fracking and gas #12;What is the difference between conventional gas drilling and fracking? In many places natural

  19. QER- Comment of Western Environmental Law Center

    Broader source: Energy.gov [DOE]

    To whom it may concern, I provided the following comments at the public meeting in Santa Fe, NM on 8/11/14: My name is Thomas Singer, and I am a Senior Policy Advisor at the Western Environmental Law Center.

  20. First Western Forum on Energy & Water Sustainability

    E-Print Network [OSTI]

    Keller, Arturo A.

    ­ boils down to economics. Water drives technology and price of energy." "Looking to move to dry or hybridFirst Western Forum on Energy & Water Sustainability University of California, Santa Barbara John R,000 1950 1960 1970 1980 1990 2000 Year gal/MWh Trend in U.S. Thermoelectric Power Water Withdrawal

  1. Northern and Western Minnesota and NW Wisconsin

    E-Print Network [OSTI]

    Minnesota, University of

    Super Haul Corridors g)! Western Truck Route h)! Lancaster Border Crossing i)! Designated Truck Network factors. 6. Super Haul Truck Corridors Conduct an analysis of best the best routes for moving heavy Commission d)! Intermodal Improvements at Dilworth e)! Truck Size and Weight Harmonization f)! Designated

  2. Famennian microbial reef facies, Napier and Oscar Ranges, Canning Basin, western Australia

    E-Print Network [OSTI]

    Stephens, N P; Sumner, Dawn Y.

    2003-01-01T23:59:59.000Z

    Geol. Rundsch. , Western Australia: Geologic Maps of theof the Canning basin, Western Australia. West. Aust. Geol.the Canning Basin, Western Australia. In: Stromatolites (Ed.

  3. Late devonian carbon isotope stratigraphy and sea level fluctuations, Canning Basin, Western Australia

    E-Print Network [OSTI]

    Stephens, N P; Sumner, Dawn Y.

    2003-01-01T23:59:59.000Z

    reef, Canning Basin, Western Australia. Palaeontology 43,the Canning Basin, Western Australia. In: Loucks, R.G. ,Canning Basin, Western Australia. Ph.D Thesis, University of

  4. Weitzenböck's Torsion, Fermi Coordinates and Adapted Frames

    E-Print Network [OSTI]

    Donato Bini; Bahram Mashhoon

    2015-04-19T23:59:59.000Z

    We study Weitzenb\\"ock's torsion and discuss its properties. Specifically, we calculate the measured components of Weitzenb\\"ock's torsion tensor for a frame field adapted to static observers in a Fermi normal coordinate system that we establish along the world line of an arbitrary accelerated observer in general relativity. A similar calculation is carried out in the standard Schwarzschild-like coordinates for static observers in the exterior Kerr spacetime; we then compare our results with the corresponding curvature components. Our work supports the contention that in the extended general relativistic framework involving both the Levi-Civita and Weitzenb\\"ock connections, curvature and torsion provide complementary representations of the gravitational field.

  5. Chaotic coordinates for the Large Helical Device

    SciTech Connect (OSTI)

    Hudson, S. R., E-mail: shudson@pppl.gov [Princeton Plasma Physics Laboratory, P.O. Box 451, Princeton, New Jersey 08543 (United States); Suzuki, Y. [National Institute for Natural Sciences, National Institute for Fusion Sciences, 322-6 Oroshi, Toki, 509-5292 (Japan)

    2014-10-15T23:59:59.000Z

    The theory of quadratic-flux-minimizing (QFM) surfaces is reviewed, and numerical techniques that allow high-order QFM surfaces to be efficiently constructed for experimentally relevant, non-integrable magnetic fields are described. As a practical example, the chaotic edge of the magnetic field in the Large Helical Device (LHD) is examined. A precise technique for finding the boundary surface is implemented, the hierarchy of partial barriers associated with the near-critical cantori is constructed, and a coordinate system, which we call chaotic coordinates, that is based on a selection of QFM surfaces is constructed that simplifies the description of the magnetic field, so that flux surfaces become “straight” and islands become “square.”.

  6. Noncommutative theories and general coordinate transformations

    SciTech Connect (OSTI)

    Fosco, C.D. [Centro Atomico de Bariloche and Instituto Balseiro, Comision Nacional de Energia Atomica, 8400 Bariloche (Argentina); Torroba, G. [Department of Physics and Astronomy, Rutgers University, Piscataway, NJ 08855 (United States)

    2005-03-15T23:59:59.000Z

    We study the class of noncommutative theories in d dimensions whose spatial coordinates (x{sub i}){sub i=1}{sup d} can be obtained by performing a smooth change of variables on (y{sub i}){sub i=1}{sup d}, the coordinates of a standard noncommutative theory, which satisfy the relation [y{sub i},y{sub j}]=i{theta}{sub ij}, with a constant {theta}{sub ij} tensor. The x{sub i} variables verify a commutation relation which is, in general, space dependent. We study the main properties of this special kind of noncommutative theory and show explicitly that, in two dimensions, any theory with a space-dependent commutation relation can be mapped to another where that {theta}{sub ij} is constant.

  7. Electrical/Electronic Engineering

    E-Print Network [OSTI]

    Berdichevsky, Victor

    Electrical/Electronic Engineering Technology The Division of Engineering of Science in Electrical/Electronic Engineering Technology Get ready for a dynamic career in Electrical/Electronic Engineering Technology. Possible applications

  8. Electricity Restructuring: Deregulation or Reregulation?

    E-Print Network [OSTI]

    Borenstein, Severin; Bushnell, James

    2000-01-01T23:59:59.000Z

    Power in the British Electricity Spot Market. ” American805. Catherine Wolfram. “Electricity Markets: Should thePower in Wholesale Electricity Markets. ” The Electricity

  9. ELECTRICAL ENERGY SYSTEMS ELECTRICAL ENERGY SYSTEMS

    E-Print Network [OSTI]

    Strathclyde, University of

    countries to install solar energy technologies into local schools and hospitals. In its Energy PolicyMEng ELECTRICAL ENERGY SYSTEMS #12;MEng ELECTRICAL ENERGY SYSTEMS Electrical energy is vital aspects of modern life. One of the biggest challenges facing society is the need for reliable energy

  10. DOE handbook electrical safety

    SciTech Connect (OSTI)

    NONE

    1998-01-01T23:59:59.000Z

    Electrical Safety Handbook presents the Department of Energy (DOE) safety standards for DOE field offices or facilities involved in the use of electrical energy. It has been prepared to provide a uniform set of electrical safety guidance and information for DOE installations to effect a reduction or elimination of risks associated with the use of electrical energy. The objectives of this handbook are to enhance electrical safety awareness and mitigate electrical hazards to employees, the public, and the environment.

  11. Electrical safety guidelines

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    The Electrical Safety Guidelines prescribes the DOE safety standards for DOE field offices or facilities involved in the use of electrical energy. It has been prepared to provide a uniform set of electrical safety standards and guidance for DOE installations in order to affect a reduction or elimination of risks associated with the use of electrical energy. The objectives of these guidelines are to enhance electrical safety awareness and mitigate electrical hazards to employees, the public, and the environment.

  12. Localization and Coordination in Decentralized Multi-Robot Systems

    E-Print Network [OSTI]

    Sun, Yu

    Localization and Coordination in Decentralized Multi-Robot Systems Patricia Kristine Sheridan Supervisor: Professor B. Benhabib Department of Mechanical and Industrial Engineering University of Toronto March, 2009 #12;Localization and Coordination in Decentralized Multi-Robot Systems ABSTRACT

  13. Fiscal policy coordination in times of economic and financial crises 

    E-Print Network [OSTI]

    Rommerskirchen, Charlotte Sophie

    2014-07-01T23:59:59.000Z

    This thesis examines fiscal policy coordination in the EU during the Great Recession (2008-2010). For the first time since the Maastricht Treaty heralded the coordination of macroeconomic policies among EU Member States, ...

  14. Development and Validation of the Transition Coordinators Survey

    E-Print Network [OSTI]

    Bjorkman Wade, Diana K.

    2014-05-31T23:59:59.000Z

    The purpose of this study was to create a valid and reliable instrument for the field of secondary special education and transition by developing and validating the Transition Coordinators Survey (TCS). Transition coordinators are professionals who...

  15. Acquaintanceship, familiarity, and coordinated laughter in writing tutorials

    E-Print Network [OSTI]

    Thonus, Terese

    2008-01-01T23:59:59.000Z

    of sequenced, simultaneous, and extended laughter. Familiarity, viewed as a continuum,was also investigated with reference to coordinated laughter. Results showed that coordinated laughter was indeed more frequent in acquainted-pair interactions, and in those...

  16. automated optimal coordination: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    16 17 18 19 20 21 22 23 24 25 Next Page Last Page Topic Index 1 Pathwise coordinate optimization CiteSeer Summary: We consider one-at-a-time coordinate-wise descent algorithms...

  17. Coolerado 5 Ton RTU Performance: Western Cooling Challenge Results (Revised)

    SciTech Connect (OSTI)

    Kozubal, E.; Slayzak, S.

    2010-11-01T23:59:59.000Z

    The Western Cooling Efficiency Center (WCEC) developed a set of criteria for test conditions, minimum energy, and water use performance for prototype cooling equipment and identified these conditions as indicative of western state climates.

  18. Production, Cost, and Soil Compaction Estimates for Two Western Juniper

    E-Print Network [OSTI]

    Dodson, Beth

    , Crook County Soil and Water Conservation District, Prineville, OR 97754. ABSTRACT: Harvesting trialsProduction, Cost, and Soil Compaction Estimates for Two Western Juniper Extraction Systems, production rates, and soil compaction impacts of two systems for harvesting western juniper (Juniperus

  19. UniversityApartments/Platt'sLaneEstates Western Apartments Handbook

    E-Print Network [OSTI]

    Sinnamon, Gordon J.

    UniversityApartments/Platt'sLaneEstates Western Apartments Handbook Page 1 WELCOME Western & Platt's Lane Estates). The University Apartments are focused on providing accommodations to upper year single students, while Platt's Lane Estates provides accommodations for students with families

  20. Materials & Biomaterials Western University has demonstrated international leadership in

    E-Print Network [OSTI]

    Denham, Graham

    Materials & Biomaterials Western University has demonstrated international leadership in materials to materials science; the synthesis, characterization and application of materials, particularly lightweight materials; and emerging work in chemical biology and proteins. Western's researchers are designing

  1. New Geothermal Prospects in the Western United States Show Promise...

    Energy Savers [EERE]

    New Geothermal Prospects in the Western United States Show Promise New Geothermal Prospects in the Western United States Show Promise February 27, 2013 - 2:21pm Addthis New...

  2. VEE-0040- In the Matter of Western Star Propane, Inc.

    Broader source: Energy.gov [DOE]

    On February 18, 1997, Western Star Propane, Inc. (Western) filed an Application for Exception with the Office of Hearings and Appeals (OHA) of the Department of Energy (DOE). In its application,...

  3. arc western pacific: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cane is then modified to investigate the evolution of the western Pacific Wang, Chunzai 54 10A.7 CLUSTER ANALYSIS OF WESTERN NORTH PACIFIC TROPICAL CYCLONE TRACKS Suzana J....

  4. Middle Paleozoic convergent orogenic belts in western Inner Mongolia (China)

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Middle Paleozoic convergent orogenic belts in western Inner Mongolia (China): framework, kinematics recognized in western Inner Mongolia (China), including, from south to north: North China Craton (NCC), Southern Orogenic Belt (SOB), Hunshandake Block (HB), Northern Orogenic Belt (NOB), South Mongolia

  5. Edison Electric Institute Update

    Broader source: Energy.gov [DOE]

    Presentation—given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting—discusses the Edison Electric Institute (EEI) and the current electricity landscape.

  6. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    End Use: December 2014 Retail ratesprices and consumption In this section, we look at what electricity costs and how much is purchased. Charges for retail electric service are...

  7. California's electricity crisis

    E-Print Network [OSTI]

    Joskow, Paul L.

    2001-01-01T23:59:59.000Z

    The collapse of California's electricity restructuring and competition program has attracted attention around the world. Prices in California's competitive wholesale electricity market increased by 500% between the second ...

  8. areas joint coordinating: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    resolution; support of analytical modelling; and description of the organizational environment. Keywords : coordination; group decision support; collaborative office processes;...

  9. Coordinating Pediatric Medical Care during an Influenza Pandemic - Hospital Workbook

    SciTech Connect (OSTI)

    HCTT CHE

    2010-01-01T23:59:59.000Z

    This workbook is intended to assist hospitals with coordinating medical care for pediatric influenza-like illness across their community.

  10. Outreach Letter Template for Clean Cities Coordinators Promoting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Letter Template for Clean Cities Coordinators Promoting the Workplace Charging Challenge ccoutreachlettertemplate-final.docx More Documents & Publications Outreach Letter...

  11. DRAFT COMMITTEE REPORT RENEWABLE ENERGY PROGRAM

    E-Print Network [OSTI]

    ............................................ E-26 APPENDIX F: Consumer Education Program WREGIS Contract Support.......................................................................................................................................F-1 Western Electricity Coordinating CouncilProse ......................................................................................................................................F-2 Other Consumer Education Activities

  12. COMMISSION REPORT RENEWABLE ENERGY PROGRAM

    E-Print Network [OSTI]

    -11 APPENDIX E: Consumer Education Program WREGIS Contract Support...................................................................................................................................... E-1 Western Electricity Coordinating Council..................................................................................................................................... E-2 Other Consumer Education Activities

  13. DRAFT COMMITTEE REPORT RENEWABLE ENERGY PROGRAM

    E-Print Network [OSTI]

    -11 APPENDIX E: Consumer Education Program WREGIS Contract Support...................................................................................................................................... E-1 Western Electricity Coordinating Council..................................................................................................................................... E-2 Other Consumer Education Activities

  14. NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC.

    E-Print Network [OSTI]

    Renewable Energy Laboratory (NREL) and Western Electricity Coordinating Council (WECC) to support in increased cycling of conventional fossil generation. Previous studies by NREL and WECC have corroborated

  15. Fact Sheet - Reliability entity registration - November 2006

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    workshops built on material present- ed by Western Electricity Coordinating Council (WECC) staff in a series of workshops held last August. In addition, the task force provided...

  16. Demand Response Spinning Reserve Demonstration

    E-Print Network [OSTI]

    2007-01-01T23:59:59.000Z

    Electric Coordinating Council (WECC); Fred LeBlanc, WesternAdministration (WAPA) and WECC; and Dorris Lam, Californiaon System Stability. WECC system stability is enhanced when

  17. ENVS 404: Internship Syllabus Contact Information: Internship Coordinator

    E-Print Network [OSTI]

    1 ENVS 404: Internship Syllabus Contact Information: Internship Coordinator Peg Boulay Environmental Leadership Program Co-Director, Internship Coordinator and Academic Adviser 242 Columbia Hall 541-346-5945 boulay@uoregon.edu Note: The Internship Coordinator position may also be filled by a Graduate Teaching

  18. 2008-2009 Graduate Coordinators Program Contact Person Phone

    E-Print Network [OSTI]

    Karsai, Istvan

    & Design Ms. Patricia Mink , Coordinator 5739 MINK@etsu.edu 70708 Biological Sciences: Microbiology Dr. Bert Lampson, Coordinator 4572 LAMPSON@etsu.edu 70673 Biological Sciences: Biology Dr. Mike Zavada, Chair & Coordinator 6919 ZAVADAM@etsu.edu 70703 Biological Sciences: Paleontology Dr. Blaine Schubert

  19. SME dependence and coordination in innovation networks RESEARCH PAPER

    E-Print Network [OSTI]

    Boyer, Edmond

    SME dependence and coordination in innovation networks RESEARCH PAPER Elodie Gardet elodie and characterize the coordination systems used by SME hub firms that are in a situation of dependence with respect of the adequate coordination mechanims is central for a SME hub firm and the success of the innovation project

  20. TERTIARY INSTITUTIONS SERVICE CENTRE (Incorporated in Western Australia)

    E-Print Network [OSTI]

    TERTIARY INSTITUTIONS SERVICE CENTRE (Incorporated in Western Australia) 100 Royal Street East Perth, Western Australia 6004 Telephone (08) 9318 8000 Facsimile (08) 9225 7050 http://www.tisc.edu.au/ Curtin University · Edith Cowan University · Murdoch University · The University of Western Australia

  1. TERTIARY INSTITUTIONS SERVICE CENTRE (Incorporated in Western Australia)

    E-Print Network [OSTI]

    TERTIARY INSTITUTIONS SERVICE CENTRE (Incorporated in Western Australia) Level 1, 100 Royal Street East Perth, Western Australia 6004 Telephone (08) 9318 8000 Facsimile (08) 9225 7050 http://www.tisc.edu.au/ Curtin University · Edith Cowan University · Murdoch University · The University of Western Australia

  2. Western Michigan University -Extended University Programs How to Get Started

    E-Print Network [OSTI]

    de Doncker, Elise

    Western Michigan University - Extended University Programs How to Get Started Interested in takingThe first toWestern Michigan University, Office of Admissions,1903W. Michigan Ave,Kalamazoo,MI 49008Western Michigan University,Office of Admissions,1903W.Michigan Ave, Kalamazoo,MI 49008-5211;the other

  3. Neurobiology Engineering Laboratory Western Michigan University

    E-Print Network [OSTI]

    Miller, Damon A.

    stimulation on protein production by skeletal muscle cells. Support WMU College of Engineering and Applied) in neural research. MEAs enable long term measurement and stimulation of neuron cell culture electrical J.-M. Vianney, D. Miller, and J. Spitsbergen, "Treatment with acetylcholine or electrical

  4. Introduction Computational Efficiency Electricity Portfolio Planning Electricity Portfolios

    E-Print Network [OSTI]

    Introduction Computational Efficiency Electricity Portfolio Planning Electricity Portfolios 2009/11/30­12/01 István Maros Electricity Portfolio #12;Introduction Computational Efficiency Electricity Portfolio Outline 1 Introduction 2 Computational Efficiency 3 Electricity Portfolio Approximate

  5. Economics and Policies for Carbon Capture and Sequestration in the Western United States: A Marginal Cost Analysis of Potential Power Plant Deployment

    E-Print Network [OSTI]

    capital costs. Capacity factors and the impact of carbon prices vary considerably by plant location: A Marginal Cost Analysis of Potential Power Plant Deployment by Gary Shu B.S., Electrical Engineering;Economics and Policies for Carbon Capture and Sequestration in the Western United States: A Marginal Cost

  6. Abstract Coordinate Transforms in Kinematic Changeable Sets and their Properties

    E-Print Network [OSTI]

    Ya. I. Grushka

    2015-04-14T23:59:59.000Z

    One of the fundamental postulates of the special relativity theory is existence of a single system of universal coordinate transforms for inertial reference frames, that is coordinate transforms, which are uniquely determined by space-time coordinates of a material point. In this paper the abstract mathematical theory of coordinate transforms in kinematic changeable sets is developed. In particular it is proved the formal possibility of existence of kinematics, which do not allow universal coordinate transforms. Such kinematics may be applied for simulation the evolution of physical systems under the condition of hypothesis on existence of particle-dependent velocity of light.

  7. Renewable Electricity Futures Study

    E-Print Network [OSTI]

    Renewable Electricity Futures Study End-use Electricity Demand Volume 3 of 4 Volume 2 PDF Volume 3;Renewable Electricity Futures Study Edited By Hand, M.M. National Renewable Energy Laboratory Baldwin, S. U Sandor, D. National Renewable Energy Laboratory Suggested Citations Renewable Electricity Futures Study

  8. Renewable Electricity Futures Study

    E-Print Network [OSTI]

    Renewable Electricity Futures Study Bulk Electric Power Systems: Operations and Transmission by the Alliance for Sustainable Energy, LLC. #12;Renewable Electricity Futures Study Edited By Hand, M.M. National Suggested Citations Renewable Electricity Futures Study (Entire Report) National Renewable Energy Laboratory

  9. Renewable Electricity Futures Study

    E-Print Network [OSTI]

    Renewable Electricity Futures Study Exploration of High-Penetration Renewable Electricity Futures PDF Volume 4 PDF #12;Renewable Electricity Futures Study Edited By Hand, M.M. National Renewable Citations Renewable Electricity Futures Study (Entire Report) National Renewable Energy Laboratory. (2012

  10. Massachusetts Electric Vehicle Efforts

    E-Print Network [OSTI]

    California at Davis, University of

    Massachusetts Electric Vehicle Efforts Christine Kirby, MassDEP ZE-MAP Meeting October 24, 2014 #12 · Provide Clean Air · Grow the Clean Energy Economy · Electric vehicles are a key part of the solution #12 is promoting EVs 4 #12;TCI and Electric Vehicles · Established the Northeast Electric Vehicle Network through

  11. ELECTRICAL & COMPUTER ENGINEERING

    E-Print Network [OSTI]

    ELECTRICAL & COMPUTER ENGINEERING SEMINAR "Agile Sensing Systems: Analysis, Design and Implementation" by Prof. Jun (Jason) Zhang Electrical and Computer Engineering University of Denver Tuesday of Electrical and Computer Engineering at the University of Denver. He was with the School of Electrical

  12. ELECTRICAL ENGINEERING Curriculum Notes

    E-Print Network [OSTI]

    Mather, Patrick T.

    ELECTRICAL ENGINEERING Curriculum Notes 2013-2014 1. Electrical Engineering (EE) students must/programs/electrical_engineering) and minors are used to regulate technical electives. A student must complete four technical elective courses in Electrical Engineering or Computer Engineering. At a minimum

  13. Electronics, Electrical Engineering

    E-Print Network [OSTI]

    SCHOOL OF Electronics, Electrical Engineering and Computer Science IS IN YOUR HANDS THE FUTURE #12;SCHOOL OF Electronics, Electrical Engineering and Computer Science2 CAREERS IN ELECTRONICS, ELECTRICAL Belfast. Ranked among the top 100 in the world for Electrical and Electronic Engineering (QS World

  14. Syracuse University Electrical Engineering

    E-Print Network [OSTI]

    Mather, Patrick T.

    Syracuse University Electrical Engineering and Computer Science Tenure Track Faculty Position in Electrical Engineering The Department of Electrical Engineering and Computer Science is seeking applicants for a tenure track position in Electrical Engineering starting in August 2014 or January 2015. The department

  15. Electrical Engineering UNDERGRADUATE

    E-Print Network [OSTI]

    Suzuki, Masatsugu

    447 Electrical Engineering UNDERGRADUATE PROGRAMS The bachelor of science program in electrical advising office. Requirements for BS Degree in Electrical Engineering To receive the BS degree in electrical engineer- ing, students must complete a minimum of 65 credit hours in the upper-division program

  16. ELECTRICAL AND COMPUTER ENGINEERING

    E-Print Network [OSTI]

    Haykin, Simon

    Edison (prolific inventor), Nikola Tesla (inventor of the electric motor, transformer), Dilbert (comic

  17. The coordinate coherent states approach revisited

    SciTech Connect (OSTI)

    Miao, Yan-Gang, E-mail: miaoyg@nankai.edu.cn; Zhang, Shao-Jun, E-mail: sjzhang@mail.nankai.edu.cn

    2013-02-15T23:59:59.000Z

    We revisit the coordinate coherent states approach through two different quantization procedures in the quantum field theory on the noncommutative Minkowski plane. The first procedure, which is based on the normal commutation relation between an annihilation and creation operators, deduces that a point mass can be described by a Gaussian function instead of the usual Dirac delta function. However, we argue this specific quantization by adopting the canonical one (based on the canonical commutation relation between a field and its conjugate momentum) and show that a point mass should still be described by the Dirac delta function, which implies that the concept of point particles is still valid when we deal with the noncommutativity by following the coordinate coherent states approach. In order to investigate the dependence on quantization procedures, we apply the two quantization procedures to the Unruh effect and Hawking radiation and find that they give rise to significantly different results. Under the first quantization procedure, the Unruh temperature and Unruh spectrum are not deformed by noncommutativity, but the Hawking temperature is deformed by noncommutativity while the radiation specturm is untack. However, under the second quantization procedure, the Unruh temperature and Hawking temperature are untack but the both spectra are modified by an effective greybody (deformed) factor. - Highlights: Black-Right-Pointing-Pointer Suggest a canonical quantization in the coordinate coherent states approach. Black-Right-Pointing-Pointer Prove the validity of the concept of point particles. Black-Right-Pointing-Pointer Apply the canonical quantization to the Unruh effect and Hawking radiation. Black-Right-Pointing-Pointer Find no deformations in the Unruh temperature and Hawking temperature. Black-Right-Pointing-Pointer Provide the modified spectra of the Unruh effect and Hawking radiation.

  18. An approach to closed network signal coordination

    E-Print Network [OSTI]

    Dutt, Amitabh K

    1971-01-01T23:59:59.000Z

    for traffic signal coordination in a closed signal system in order to improve the quality of flow. Three methods have been developed. The first one, the method of independent link analysis is based on the assumption that delay in a link depends solely... on the offset between the settir gs of the signal at each end of the link and independent of any other signal setting in the network. The second method is based on a set of time reference equations. This method is very useful in situations where the link...

  19. An Incident Management Preparedness and Coordination Toolkit

    SciTech Connect (OSTI)

    Koch, Daniel B [ORNL; Payne, Patricia W [ORNL

    2012-01-01T23:59:59.000Z

    Although the use of Geographic Information Systems (GIS) by centrally-located operations staff is well established in the area of emergency response, utilization by first responders in the field is uneven. Cost, complexity, and connectivity are often the deciding factors preventing wider adoption. For the past several years, Oak Ridge National Laboratory (ORNL) has been developing a mobile GIS solution using free and open-source software targeting the needs of front-line personnel. Termed IMPACT, for Incident Management Preparedness and Coordination Toolkit, this ORNL application can complement existing GIS infrastructure and extend its power and capabilities to responders first on the scene of a natural or man-made disaster.

  20. Widget:CoordinatesHelper | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTri GlobalJump to:Westwood RenewablesBoundingCoordinatesHelpergenerates

  1. Coordinating Energy Efficiency With Water Conservation Services |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: Theof"Wave theJuly 30, 2013Department of Energy Coordinating Energy

  2. ECE 438 Electric and Hybrid Vehicles Catalog Description: History of electric traction. Introduction to electric and hybrid-electric

    E-Print Network [OSTI]

    ECE 438 ­ Electric and Hybrid Vehicles Catalog Description: History of electric traction. Introduction to electric and hybrid-electric vehicle configurations. Vehicle mechanics. Energy sources and storage. Range prediction. Motor for HEVs. Electric drive components. Vehicle transmission system. Credits

  3. Atmospheric fluidized-bed combustion testing of western Kentucky limestones

    SciTech Connect (OSTI)

    Zimmerman, G.P.; Holcomb, R.S.; Guymon, R.H.

    1982-09-01T23:59:59.000Z

    The Oak Ridge National Laboratory (ORNL) is studying and testing the burning of coal in an atmospheric fluidized-bed combustor (AFBC) as a means of generating electricity and/or process heat in an environmentally acceptable manner. The abundant, high-sulfur coal resources in this country can be utilized effectively in such a system. The ORNL test program supporting the 20-MW(e) AFBC pilot plant planned for operation by the Tennessee Valley Authority (TVA) in 1982 is described. During the test program 625 hours of coal combustion were accumulated in a 25-cm-diam bench scale AFBC. The fuel was Kentucky No. 9 coal with about 4% sulfur. Five different limestones from the Western Kentucky area were tested for their ability to reduce sulfur dioxide emissions. The bench scale combustor was operated under a variety of conditions including changes in bed temperature, bed height and superficial velocity. At a superficial velocity of 1.2 m/s, four of the five limestones achieved 90% sulfur retention with weight ratios of limestone feed to coal feed near 0.40:1 under no recycle (once through) operation. Carbon utilization (based on carbon loss data) averaged 84% for these tests. Two of the more promising stones were tested by recycling the material elutriated from the combustor. The amount of fresh limestone required for 90% sulfur retention was reduced by up to 50%. Carbon utilization approaching 98% was obtained under these conditions.

  4. Multiagent coordination in microgrids via wireless networks

    E-Print Network [OSTI]

    Hao Liang; Atef Abdrabou

    The future smart grid is expected to be an integration of intelligent microgrids featured by localized electricity generation, storage, and consumption. Wireless communication is a promising means to facilitate pervasive microgrid monitoring and control at a high flexibility and low deployment cost

  5. Richmond Electric Vehicle Initiative Electric Vehicle Readiness...

    Broader source: Energy.gov (indexed) [DOE]

    The REVi plan addresses the electric vehicle market in Richmond and then addresses a regional plan, policies, and analysis of the the communities readiness. richmondevinitiative....

  6. Richmond Electric Vehicle Initiative Electric Vehicle Readiness...

    Broader source: Energy.gov (indexed) [DOE]

    reflect those of the United States Government or any agency thereof. Richmond Electric Vehicle Initiative Readiness Plan | 1 Table of Contents Executive Summary...

  7. SCENARIOS FOR MEETING CALIFORNIA'S 2050 CLIMATE GOALS California's Carbon Challenge Phase II Volume I: Non-Electricity Sectors and Overall Scenario Results

    SciTech Connect (OSTI)

    Wei, Max; Greenblatt, Jeffrey; Donovan, Sally; Nelson, James; Mileva, Ana; Johnston, Josiah; Kammen, Daniel

    2014-06-01T23:59:59.000Z

    This study provides an updated analysis of long-term energy system scenarios for California consistent with the State meeting its 2050 climate goal, including detailed analysis and assessment of electricity system build-out, operation, and costs across the Western Electricity Coordinating Council (WECC) region. Four key elements are found to be critical for the State to achieve its 2050 goal of 80 percent greenhouse (GHG) reductions from the 1990 level: aggressive energy efficiency; clean electricity; widespread electrification of passenger vehicles, building heating, and industry heating; and large-scale production of low-carbon footprint biofuels to largely replace petroleum-based liquid fuels. The approach taken here is that technically achievable energy efficiency measures are assumed to be achieved by 2050 and aggregated with the other key elements mentioned above to estimate resultant emissions in 2050. The energy and non-energy sectors are each assumed to have the objective of meeting an 80 percent reduction from their respective 1990 GHG levels for the purposes of analysis. A different partitioning of energy and non-energy sector GHG greenhouse reductions is allowed if emission reductions in one sector are more economic or technically achievable than in the other. Similarly, within the energy or non-energy sectors, greater or less than 80 percent reduction from 1990 is allowed for sub-sectors within the energy or non-energy sectors as long as the overall target is achieved. Overall emissions for the key economy-wide scenarios are considered in this report. All scenarios are compliant or nearly compliant with the 2050 goal. This finding suggests that multiple technical pathways exist to achieve the target with aggressive policy support and continued technology development of largely existing technologies.

  8. PROJECT REPORT WESTERN COOLING CHALLENGE LABORATORY

    E-Print Network [OSTI]

    California at Davis, University of

    on advanc- ing commercial development and market introduction of rooftop packaged air conditioners optimized independent environmental test chamber in the United States, located at their HVAC & Electrical test facility

  9. Western Baldwin County, AL Grid Interconnection Project

    SciTech Connect (OSTI)

    Thomas DeBell

    2011-09-30T23:59:59.000Z

    The Objective of this Project was to provide an additional supply of electricity to the affected portions of Baldwin County, AL through the purchase, installation, and operation of certain substation equipment.

  10. L'insuffisance des signaux de localisation pour la coordination entre la production et le transport d'lectricit dans les

    E-Print Network [OSTI]

    Boyer, Edmond

    run coordination between generation and transmission is organized in a liberalized power system. We between generation and transmission of electricity. The governance structure of the power transmission implemented by the power Transmission and System Operators. Although the locational signals are necessary

  11. Comparisons of pyrite variability from selected western Kentucky and western Pennsylvania coals

    SciTech Connect (OSTI)

    Frankie, K.A.; Hower, J.C.

    1983-03-01T23:59:59.000Z

    Pyrite (and marcasite) variation in the lower Kittanning coal of western Pennsylvania has been petrographically characterized using three parameters of size (categories rather than absolute size), morphology (framboidal, euhedral, dendritic, massive, and cleat), and microlithotype (organic) association. The purpose of this study is to evaluate what influence paleo-environments have on the nature of variation of pyrite in coal. Comparison of coals has been done using the percentages of pyrite in the microlithotypes vitrite and clarite. In the lower Kittanning coal, framboidal pyrite is generally less abundant and dendritic pyrite was not observed at all. Euhedral pyrite exhibited no clear variation between the two environments. Massive pyrite was more abundant in the set of samples from the mine with the highest average pyritic sulfur but otherwise exhibited no variation. In contrast, a larger percentage of pyrite in the western Kentucky coals examined is framboidal and dendritic. Mines examined in the Moorman syncline of western Kentucky do have a framboidal pyrite percentage comparable to the lower Kittanning samples, but the percentage of dendritic pyrite (particularly in the Western Kentucky No. 9 coal) is significantly higher for the western Kentucky coals. Bulk petrography of the coals is similar with all having greater than 80% total vitrinite. The association of the pyritic sulfur does, however, change significantly between the various coals studied and particularly between the coals of western Kentucky and among the marine lower Kittanning samples and the fresh water lower Kittanning samples. Among the pyrite in the fresh water coals, massive (perhaps epigenetic) pyrite dominates the associations.

  12. Mapping water availability, projected use and cost in the western United States

    SciTech Connect (OSTI)

    Vincent C. Tidwell; Barbara D. Moreland; Katie M. Zemlick; Barry L. Roberts; Howard D. Passell; Daniel Jensen; Christopher Forsgren; Gerald Sehlke; Margaret A. Cook; Carey W. King

    2014-06-01T23:59:59.000Z

    New demands for water can be satisfied through a variety of source options. In some basins surface and/or groundwater may be available through permitting with the state water management agency (termed unappropriated water), alternatively water might be purchased and transferred out of its current use to another (termed appropriated water), or non-traditional water sources can be captured and treated (e.g., wastewater). The relative availability and cost of each source are key factors in the development decision. Unfortunately, these measures are location dependent with no consistent or comparable set of data available for evaluating competing water sources. With the help of western water managers, water availability was mapped for over 1200 watersheds throughout the western US. Five water sources were individually examined, including unappropriated surface water, unappropriated groundwater, appropriated water, municipal wastewater and brackish groundwater. Also mapped was projected change in consumptive water use from 2010 to 2030. Associated costs to acquire, convey and treat the water, as necessary, for each of the five sources were estimated. These metrics were developed to support regional water planning and policy analysis with initial application to electric transmission planning in the western US.

  13. Did geomagnetic activity challenge electric power reliability during solar cycle 23? Evidence from the PJM regional transmission

    E-Print Network [OSTI]

    Schrijver, Karel

    Did geomagnetic activity challenge electric power reliability during solar cycle 23? Evidence from through 30 April 2004. During this time period PJM coordinated the movement of wholesale electricity of challenged reliability is the incidence of out-of-economic-merit order dispatching due to adverse reactive

  14. Electricity Today30 American Electric Power, working

    E-Print Network [OSTI]

    Laughlin, Robert B.

    Electricity Today30 American Electric Power, working at the request of, and in partnership with by building transmis- sion infrastructure that will enable wind power to become a larger part of the nation that could provide a basis for discussion to expand industry infrastructure needs in the future. AEP believes

  15. Estimating the Value of Electricity Storage Resources in Electricity...

    Broader source: Energy.gov (indexed) [DOE]

    for understanding the role electricity storage resources (storage) can play in wholesale and retail electricity markets, 2) assessing the value of electricity storage in a...

  16. Assessing Vehicle Electricity Demand Impacts on California Electricity Supply

    E-Print Network [OSTI]

    McCarthy, Ryan W.

    2009-01-01T23:59:59.000Z

    management in the US electricity sector, Energy Policy, 23(deep reductions in electricity sector GHG emissions requireson the electricity sector. 19 Table 3.

  17. Assessing Vehicle Electricity Demand Impacts on California Electricity Supply

    E-Print Network [OSTI]

    McCarthy, Ryan W.

    2009-01-01T23:59:59.000Z

    in Figure 63. Average electricity costs are noticeably lowerprofile has lower average electricity costs, because fossiland generation, average electricity costs, and GHG emissions

  18. Distributed Sensor Coordination for Advanced Energy Systems

    SciTech Connect (OSTI)

    Tumer, Kagan

    2013-07-31T23:59:59.000Z

    The ability to collect key system level information is critical to the safe, efficient and reli- able operation of advanced energy systems. With recent advances in sensor development, it is now possible to push some level of decision making directly to computationally sophisticated sensors, rather than wait for data to arrive to a massive centralized location before a decision is made. This type of approach relies on networked sensors (called “agents” from here on) to actively collect and process data, and provide key control deci- sions to significantly improve both the quality/relevance of the collected data and the as- sociating decision making. The technological bottlenecks for such sensor networks stem from a lack of mathematics and algorithms to manage the systems, rather than difficulties associated with building and deploying them. Indeed, traditional sensor coordination strategies do not provide adequate solutions for this problem. Passive data collection methods (e.g., large sensor webs) can scale to large systems, but are generally not suited to highly dynamic environments, such as ad- vanced energy systems, where crucial decisions may need to be reached quickly and lo- cally. Approaches based on local decisions on the other hand cannot guarantee that each agent performing its task (maximize an agent objective) will lead to good network wide solution (maximize a network objective) without invoking cumbersome coordination rou- tines. There is currently a lack of algorithms that will enable self-organization and blend the efficiency of local decision making with the system level guarantees of global decision making, particularly when the systems operate in dynamic and stochastic environments. In this work we addressed this critical gap and provided a comprehensive solution to the problem of sensor coordination to ensure the safe, reliable, and robust operation of advanced energy systems. The differentiating aspect of the proposed work is in shift- ing the focus towards “what to observe” rather than “how to observe” in large sensor networks, allowing the agents to actively determine both the structure of the network and the relevance of the information they are seeking to collect. In addition to providing an implicit coordination mechanism, this approach allows the system to be reconfigured in response to changing needs (e.g., sudden external events requiring new responses) or changing sensor network characteristics (e.g., sudden changes to plant condition). Outcome Summary: All milestones associated with this project have been completed. In particular, private sensor objective functions were developed which are aligned with the global objective function, sensor effectiveness has been improved by using “sensor teams,” system efficiency has been improved by 30% using difference evaluation func- tions, we have demonstrated system reconfigurability for 20% changes in system con- ditions, we have demonstrated extreme scalability of our proposed algorithm, we have demonstrated that sensor networks can overcome disruptions of up to 20% in network conditions, and have demonstrated system reconfigurability to 20% changes in system conditions in hardware-based simulations. This final report summarizes how each of these milestones was achieved, and gives insight into future research possibilities past the work which has been completed. The following publications support these milestones [6, 8, 9, 10, 16, 18, 19].

  19. Emission coordinates for the navigation in space

    E-Print Network [OSTI]

    A. Tartaglia

    2009-10-15T23:59:59.000Z

    A general approach to the problem of positioning by means of pulsars or other pulsating sources located at infinity is described. The counting of the pulses for a set of different sources whose positions in the sky and periods are assumed to be known, is used to provide null emission, or light, coordinates for the receiver. The measurement of the proper time intervals between successive arrivals of the signals from the various sources is used to give the final localization of the receiver, within an accuracy controlled by the precision of the onboard clock. The deviation from the flat case is discussed, separately considering the different possible causes: local gravitational potential, finiteness of the distance of the source, proper motion of the source, period decay, proper acceleration due to non-gravitational forces. Calculations turn out to be simple and the result is highly positive. The method can also be applied to a constellation of satellites orbiting the Earth.

  20. Western Resource Adequacy: Challenges - Approaches - Metrics | Department

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradley Nickell DirectorThe&Management Alert Western AreaIn

  1. Western Ethanol Company LLC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwideWTED JumpHills, NewWestbrook, Minnesota:Western Ethanol Company LLC

  2. Western Geothermal Partners | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwideWTED JumpHills, NewWestbrook, Minnesota:Western Ethanol Company

  3. Western NY Energy LLC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwideWTED JumpHills, NewWestbrook, Minnesota:Western Ethanol

  4. Western Resource Advocates | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwideWTED JumpHills, NewWestbrook, Minnesota:Western

  5. Western States Geothermal Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwideWTED JumpHills, NewWestbrook, Minnesota:WesternSolargenics

  6. Western Governors' Association | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTri GlobalJump to: navigation,Goff,HoltWestchester County, NewWestern

  7. NorthWestern Corporation | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroup |JilinLuOpenNorth America Drilling FluidsNorth Western Elec Coop,

  8. NorthWestern Energy | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroup |JilinLuOpenNorth America Drilling FluidsNorth Western Elec

  9. Western States Shale Production (Billion Cubic Feet)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40CoalLease(Billion Cubic Feet)YearWellhead Price (Dollars perProvedWestern

  10. Western Illinois Elec Coop | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit withTianlin BaxinUmweltVillageGraphWellton-Mohawk IrrWestWestNewWesternElec Coop

  11. Western Indiana Energy REMC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit withTianlin BaxinUmweltVillageGraphWellton-Mohawk IrrWestWestNewWesternElec

  12. Western Iowa Power Coop | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit withTianlin BaxinUmweltVillageGraphWellton-MohawkWestern Iowa Power Coop Jump to:

  13. Western Massachusetts Elec Co | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit withTianlin BaxinUmweltVillageGraphWellton-MohawkWestern Iowa Power Coop Jump

  14. Designing electricity transmission auctions

    E-Print Network [OSTI]

    Greve, Thomas; Pollitt, Michael G.

    2012-10-26T23:59:59.000Z

    The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

  15. Renewable Electricity Futures (Presentation)

    SciTech Connect (OSTI)

    Hand, M. M.

    2012-09-01T23:59:59.000Z

    This presentation summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050.

  16. Renewable Electricity Futures (Presentation)

    SciTech Connect (OSTI)

    Mai, T.

    2012-10-01T23:59:59.000Z

    This presentation library summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050.

  17. Renewable Electricity Futures (Presentation)

    SciTech Connect (OSTI)

    Mai, T.

    2012-11-01T23:59:59.000Z

    This presentation summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050.

  18. Renewable Electricity Futures (Presentation)

    SciTech Connect (OSTI)

    Mai, T.

    2013-04-01T23:59:59.000Z

    This presentation summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050.

  19. Electric Efficiency Standard

    Broader source: Energy.gov [DOE]

    In December 2009, the Indiana Utility Regulatory Commission's (IURC) ordered utilities to establish demand-side management (DSM) electric savings goals leading to 2.0% reduction of electricity...

  20. Transactive Control and Coordination of Distributed Assets for Ancillary Services

    SciTech Connect (OSTI)

    Subbarao, Krishnappa; Fuller, Jason C.; Kalsi, Karanjit; Somani, Abhishek; Pratt, Robert G.; Widergren, Steven E.; Chassin, David P.

    2013-09-18T23:59:59.000Z

    The need to diversify energy supplies, the need to mitigate energy-related environmental impact, and the entry of electric vehicles in large numbers present challenges and opportunities to power system professionals. Wind and solar power provide many benefits, and to reap the benefits the resulting increased variability—forecasted as well as unforecasted—should be addressed. Demand resources are receiving increasing attention as one means of providing the grid balancing services. Control and coordination of a large number (~millions) of distributed smart grid assets requires innovative approaches. One such is transactive control and coordination (TC2)—a distributed, agent-based incentive and control system. The TC2 paradigm is to create a market system with the following characteristics: • Participation should be entirely voluntary. • The participant decides at what price s/he is willing to participate. • The bids and responses are automated. Such an approach has been developed and demonstrated by Pacific Northwest National Laboratory for energy markets. It is the purpose of this project to develop a similar approach for ancillary services. In this report, the following ancillary services are considered: • spinning reserve • ramping • regulation. These services are to be provided by the following devices: • refrigerators • water heaters • clothes dryers • variable speed drives. The important results are summarized below: The regulation signal can be divided into an energy-neutral high frequency component and a low frequency component. The high frequency component is particularly well suited for demand resources. The low frequency component, which carries energy non-neutrality, can be handled by a combination of generators and demand resources. An explicit method for such a separation is obtained from an exponentially weighted moving average filter. Causal filters (i.e., filters that process only present and past values of a signal) introduce delays that can be issues in some signal processing applications that treat the high frequency part as a noise to be eliminated. For regulation, the high frequency component is an essential part of the signal. The delay in the low frequency component is not a problem. A stochastic self-dispatch algorithm determines the response of the devices to the regulation signal. • In an ensemble of devices under normal operation, some devices turn on and some turn off in any time interval. Demand response necessitates turning off devices that would normally be on, or turning on devices that would normally be off. Over time, some of these would have turned off on their own. A formalism to determine expectation values under a combination of natural and forced attrition has been developed. This formalism provides a mechanism for accomplishing a desired power profile within a bid period. In particular, a method to minimize regulation requirement can be developed. The formulation provides valuable insights into control. • Some ancillary services—ramping to absorb unforecasted increase in renewable generation, and regulation down—require the demand resources to increase their energy use. Some resources such as HVAC systems can do this readily, whereas some others require enabling technology. Even without such technology, it is possible to arrange refrigerators and water heaters to have an energy debt and be ready to increase their energy use. A transactive bid mechanism of revolving debt can be developed for this purpose. Dramatic changes in control systems, architecture and markets are expected in the electrical grid. The technical capabilities of a large number of devices interacting with the grid are changing. While it is too early to describe complete solutions, TC2 has attractive features suitable for adapting to the changes. The analyses in this report and the activities planned for FY 14 and beyond are designed to facilitate this transition.

  1. at Western University Located in London, Ontario, Western University is situated directly in the

    E-Print Network [OSTI]

    Denham, Graham

    , while shedding light on new construction materials that make homes safer and more cost-effective · Wind in materials and biomaterials, biomedical imaging and neuroscience, as well as wind engineering. ResearchScienceWestern: Canada's premiere surface and materials analysis facility has more than 25 years of providing high

  2. Efficient random coordinate descent algorithms for large-scale ...

    E-Print Network [OSTI]

    2013-05-04T23:59:59.000Z

    (will be inserted by the editor). Efficient random coordinate descent algorithms for large-scale structured nonconvex optimization. Andrei Patrascu · Ion Necoara.

  3. Efficient Block-coordinate Descent Algorithms for the Group Lasso

    E-Print Network [OSTI]

    Zhiwei (Tony) Qin

    2010-11-10T23:59:59.000Z

    Nov 10, 2010 ... First, we propose a general version of the Block Coordinate Descent (BCD) algorithm for the Group Lasso that employs an efficient approach ...

  4. Roles of Acetone and Diacetone Alcohol in Coordination and Dissociatio...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    can form stable complexes, but that the effective number of atoms coordinating with uranium in the equatorial plane does not exceed five. Diacetone alcohol ligands are shown...

  5. The Announcement Layer: Beacon Coordination for the Sensornet Stack

    E-Print Network [OSTI]

    Dunkels, Adam

    consumption. #12;MAC / Link layers ... ... Multiple, uncoordinated beacons Collect Trickle Deluge Collect Trickle Deluge Coordinated beacons Announcement layer MAC / Link layers Fig. 1. The announcement layer

  6. Coordination of Energy Efficiency and Demand Response: A Resource...

    Open Energy Info (EERE)

    Demand Response: A Resource of the National Action Plan for Energy Efficiency Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Coordination of Energy Efficiency and...

  7. Coordination of Retail Demand Response with Midwest ISO Markets

    E-Print Network [OSTI]

    Bharvirkar, Ranjit

    2008-01-01T23:59:59.000Z

    Robinson, Michael, 2008, "Demand Response in Midwest ISOPresentation at MISO Demand Response Working Group Meeting,Coordination of Retail Demand Response with Midwest ISO

  8. Gridlock: A Policy Analysis of Siting and Coordination of Interstate...

    Open Energy Info (EERE)

    of Siting and Coordination of Interstate Transmission Line Development in the Upper Midwest Authors Chet Bodin, Megan Hoye and Erik Sowers Organizations Great Plains...

  9. Coordination and Hydrolysis of Plutonium Ions in Aqueous Solution...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hydrolysis of Plutonium Ions in Aqueous Solution using Car-Parrinello Molecular Dynamics Free Energy Coordination and Hydrolysis of Plutonium Ions in Aqueous Solution using...

  10. Workplace Charging Challenge: Press Release template for Clean Cities coordinators

    Broader source: Energy.gov [DOE]

    An editable press release that Clean Cities coordinators can use to announce local Partners' participation in the EV Everywhere Workplace Charging Challenge

  11. Role of Metal Coordination Structures in Enhancement of Electrocatalyt...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Structures in Enhancement of Electrocatalytic Activity of Ternary Nanoalloys for Oxygen Reduction Role of Metal Coordination Structures in Enhancement of Electrocatalytic...

  12. Optimization Online - Stochastic Quasi-Fejér Block-Coordinate Fixed ...

    E-Print Network [OSTI]

    Patrick L. Combettes

    2014-04-29T23:59:59.000Z

    Apr 29, 2014 ... Stochastic Quasi-Fejér Block-Coordinate Fixed Point Iterations with Random Sweeping. Patrick L. Combettes (plc ***at*** math.jussieu.fr)

  13. Interagency Wild and Scenic Rivers Coordinating Council's WSRA...

    Open Energy Info (EERE)

    LibraryAdd to library PermittingRegulatory Guidance - Instructions: Interagency Wild and Scenic Rivers Coordinating Council's WSRA Section 7(a) FlowchartsPermitting...

  14. Electrical utilities relay settings

    SciTech Connect (OSTI)

    HACHE, J.M.

    1999-02-24T23:59:59.000Z

    This document contains the Hanford transmission and distribution system relay settings that are under the control of Electrical Utilities.

  15. The Case for Electric Vehicles

    E-Print Network [OSTI]

    Sperling, Daniel

    2001-01-01T23:59:59.000Z

    land Press, 1995 TESTING ELECTRIC VEHICLE DEMAND IN " HYBRIDThe Case for Electric Vehicles DanieI Sperlmg Reprint UCTCor The Case for Electric Vehicles Darnel Sperling Institute

  16. Electric Vehicle Smart Charging Infrastructure

    E-Print Network [OSTI]

    Chung, Ching-Yen

    2014-01-01T23:59:59.000Z

    for Multiplexed Electric Vehicle Charging”, US20130154561A1,Chynoweth, ”Intelligent Electric Vehicle Charging System”,of RFID Mesh Network for Electric Vehicle Smart Charging

  17. Sandia Energy - Resilient Electric Infrastructures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Resilient Electric Infrastructures Home Stationary Power Grid Modernization Resilient Electric Infrastructures Resilient Electric Infrastructuresashoter2015-04-29T22:16:42+00:00...

  18. Electric Turbo Compounding Technology Update

    Broader source: Energy.gov (indexed) [DOE]

    Turbo Compounding Technology Update Electric Turbo Compounding Technology Update 15 August, 2007 Carl Vuk 15 August, 2007 Carl Vuk Electric Turbo Compounding Highlights Electric...

  19. Balancing Cost and Risk: The Treatment of Renewable Energy in Western Utility Resource Plans

    SciTech Connect (OSTI)

    Bolinger, Mark; Wiser, Ryan

    2005-08-10T23:59:59.000Z

    Markets for renewable energy have historically been motivated primarily by policy efforts, but a less widely recognized driver is poised to also play a major role in the coming years: utility integrated resource planning (IRP). Resource planning has re-emerged in recent years as an important tool for utilities and regulators, particularly in regions where retail competition has failed to take root. In the western United States, the most recent resource plans contemplate a significant amount of renewable energy additions. These planned additions--primarily coming from wind power--are motivated by the improved economics of wind power, a growing acceptance of wind by electric utilities, and an increasing recognition of the inherent risks (e.g., natural gas price risk, environmental compliance risk) in fossil-based generation portfolios. This report examines how twelve western utilities treat renewable energy in their recent resource plans. In aggregate, these utilities supply approximately half of all electricity demand in the western United States. Our purpose is twofold: (1) to highlight the growing importance of utility IRP as a current and future driver of renewable energy, and (2) to identify methodological/modeling issues, and suggest possible improvements to methods used to evaluate renewable energy as a resource option. Here we summarize the key findings of the report, beginning with a discussion of the planned renewable energy additions called for by the twelve utilities, an overview of how these plans incorporated renewables into candidate portfolios, and a review of the specific technology cost and performance assumptions they made, primarily for wind power. We then turn to the utilities' analysis of natural gas price and environmental compliance risks, and examine how the utilities traded off portfolio cost and risk in selecting a preferred portfolio.

  20. Electrically charged pulsars

    E-Print Network [OSTI]

    M. D. Alloy; D. P. Menezes

    2007-04-24T23:59:59.000Z

    n the present work we investigate one possible variation on the usual electrically neutral pulsars: the inclusion of electric charge. We study the effect of electric charge in pulsars assuming that the charge distribution is proportional to the energy density. All calculations were performed for zero temperature and fixed entropy equations of state.

  1. Renewable Electricity Futures Study

    E-Print Network [OSTI]

    Renewable Electricity Futures Study Executive Summary NREL is a national laboratory of the U for Sustainable Energy, LLC. Volume 2 PDF Volume 3 PDF Volume 1 PDF Volume 4 PDF #12;Renewable Electricity Futures. National Renewable Energy Laboratory Suggested Citations Renewable Electricity Futures Study (Entire Report

  2. Washington State Electric Vehicle

    E-Print Network [OSTI]

    California at Davis, University of

    Washington State Electric Vehicle Implementation Bryan Bazard Maintenance and Alternate Fuel Technology Manager #12;Executive Order 14-04 Requires the procurement of electric vehicles where and equipment with electricity or biofuel to the "extent practicable" by June 2015 1. The vehicle is due

  3. UNDERGRADUATE DEPARTMENT OF ELECTRICAL

    E-Print Network [OSTI]

    Tam, Vincent W. L.

    UNDERGRADUATE HANDBOOK 2008-2009 DEPARTMENT OF ELECTRICAL & ELECTRONIC ENGINEERING #12;Undergraduate Handbook 2008-2009 DEPARTMENT OF ELECTRICAL & ELECTRONIC ENGINEERING THE UNIVERSITY OF HONG KONG © Department of Electrical & Electronic Engineering, The University of Hong Kong #12;Head of Department Prof. Y

  4. ELECTRICAL & COMPUTER ENGINEERING

    E-Print Network [OSTI]

    ELECTRICAL & COMPUTER ENGINEERING SEMINAR "Restoration of Soft X-Ray Laser Images of Nanostructures of Electronic Systems and Information Processing, University of Zagreb, Faculty of Electrical Engineering and Computing. In 1999, he received his Ph.D. in Electrical Engineering from the University of Zagreb. His

  5. ELECTRICAL & COMPUTER ENGINEERING

    E-Print Network [OSTI]

    ELECTRICAL & COMPUTER ENGINEERING SEMINAR "A Random Walk on Image Patches" by Prof. Francois Meyer Electrical, Computer, and Energy Engineering University of Colorado--Boulder Monday, April 2, 2012, 11:00 a a Ph.D. degree in electrical engineering from INRIA, France, in 1993. Meyer worked on the thermonuclear

  6. ELECTRICAL & COMPUTER ENGINEERING

    E-Print Network [OSTI]

    ELECTRICAL & COMPUTER ENGINEERING SEMINAR "Geometry as a Prior in Signal Processing" by Yuejie Chi Electrical Engineering Princeton University Monday, March 19, 2012, 11:00 a.m. Location LSC 210 Abstract processing. Biography: Yuejie Chi is a Ph.D. candidate in Electrical Engineering at Princeton University

  7. Electrical and computer engineering

    E-Print Network [OSTI]

    Berdichevsky, Victor

    Electrical and computer engineering COLLEGE of ENGINEERING DepartmentofElectricalandComputerEngineering engineers for 80 years t Home to nation's first electric-drive vehicle engineering program and alternative-credit EDGE Engineering Entrepreneur Certificate Program is a great addition to an electrical

  8. SEATTLE UNIVERSITY ELECTRICAL ENGINEERING

    E-Print Network [OSTI]

    Carter, John

    SEATTLE UNIVERSITY ELECTRICAL ENGINEERING STUDENT HANDBOOK Eighteenth Edition July 2011 Department of Electrical and Computer Engineering Seattle University 901 12th Avenue P.O. Box 222000 Seattle, WA 98122.seattleu.edu The electrical engineering program is accredited by the Engineering Accreditation Commission of ABET, http

  9. Reduces electric energy consumption

    E-Print Network [OSTI]

    BENEFITS · Reduces electric energy consumption · Reduces peak electric demand · Reduces natural gas consumption · Reduces nonhazardous solid waste and wastewater generation · Potential annual savings products for the automotive industry, electrical equipment, and miscellaneous other uses nationwide. ALCOA

  10. Undergraduate Electrical and

    E-Print Network [OSTI]

    Bristol, University of

    an excellent place to study electrical and electronic engineering. Renewable energies and smart grids are twoUndergraduate Electrical and Electronic Engineering Faculty of Engineering #12;bristol already understood the impact electrical and electronic engineering has on our lives. In fields as diverse

  11. WESTERN AREA POWER ADMINISTRATION COMMENTS/CHANGES TO DRAFT RMR...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WESTERN AREA POWER ADMINISTRATION COMMENTSCHANGES TO DRAFT RMR PA FOR ROUTINE MAINTENANCE DATED 101613 (REQUESTED ON DEC 18, 2014; EXTENDED THROUGH MARCH 10, 2014) AgencyTribe...

  12. NorthWestern Energy- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    NorthWestern Energy offers a variety of rebates for residential customers to make energy efficiency improvements in their existing homes. Customers who purchase or implement energy efficient...

  13. Western Riverside Council of Governments- Large Commercial PACE (California)

    Broader source: Energy.gov [DOE]

    Western Riverside Council of Governments (WRCOG) is offering business owners in WRCOG participating jurisdictions an opportunity to finance energy and water efficiency projects for their commercial...

  14. Impact of High Solar Penetration in the Western Interconnection

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Impact of High Solar Penetration in the Western Interconnection Debra Lew National Renewable Energy Laboratory Nicholas Miller, Kara Clark, Gary Jordan, and Zhi Gao GE Energy...

  15. Categorical Exclusion Determinations: Western Area PowerAdministratio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Center October 26, 2009 CX-005544: Categorical Exclusion Determination Power Rate Formula for the Provo River Project of the Western Area Power Administration CX(s) Applied:...

  16. NorthWestern Energy (Gas)- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    NorthWestern Energy offers a variety of rebates for residential customers to make energy efficiency improvements in their existing homes. Customers who purchase an Energy Star programmable...

  17. Biofuel Production in the Western U.S.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Biofuel Production in the Western U.S. March 25, 2015 Analysis & Sustainability Mark Wigmosta PNNL This presentation does not contain any proprietary, confidential, or otherwise...

  18. athabasca basin western: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Von P. 9 Modeling thermal convection in supradetachment basins: example from western Norway Geosciences Websites Summary: . DABROWSKI AND T. B. ANDERSEN Physics of Geological...

  19. FINAL Western Area Power Administration Desert Southwest Region...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    source materials in Western's DSW region archives and records and at the Arizona State University Library in Phoenix, Arizona. Information concerning the general history of...

  20. Western-UGP Transmission and Ancillary Services Rates Customer...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    responsibility for irrigation and municipal consumption as well as dam and powerplant construction, operation and maintenance. P a g e | 3 Western annually sells and delivers...

  1. Energy Department's Fossil Energy Chief to Tour Western Michigan...

    Office of Environmental Management (EM)

    Department's Fossil Energy Chief to Tour Western Michigan University's Clean Coal Research Facilities, Host Business Roundtable Energy Department's Fossil Energy Chief to Tour...

  2. Western Interstate Nuclear Compact State Nuclear Policy (Multiple States)

    Broader source: Energy.gov [DOE]

    Legislation authorizes states' entrance into the Western Interstate Nuclear Compact, which aims to undertake the cooperation of participating states in deriving the optimum benefit from nuclear and...

  3. CAL/AAEM Supports Western Regional Emergency Medicine Symposium

    E-Print Network [OSTI]

    Frumin, Erica; King, Lacey; Shieh, Mason

    2010-01-01T23:59:59.000Z

    water using wilderness medicine methods. In Medical LegalWestern Regional Emergency Medicine Symposium Erica Frumin,California, Irvine School of Medicine, Irvine, CA On October

  4. NorthWestern Energy- Commercial Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    NorthWestern Energy offers multiple rebate programs for commercial and industrial customers to make energy efficient improvements to their businesses. The E+ Commercial Natural Gas Savings Program...

  5. Variable Crustal Thickness In The Western Great Basin- A Compilation...

    Open Energy Info (EERE)

    Crustal Thickness In The Western Great Basin- A Compilation Of Old And New Refraction Data Abstract Utilizing commercial mine blasts and local earthquakes, as well as a dense...

  6. Determination of Electric-Field, Magnetic-Field, and Electric...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electric-Field, Magnetic-Field, and Electric-Current Distributions of Infrared Optical Antennas: A Near-Field Determination of Electric-Field, Magnetic-Field, and Electric-Current...

  7. Electrical Generation for More-Electric Aircraft using Solid...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DE-AC05-76RL01830 Electrical Generation for More-Electric Aircraft using Solid Oxide Fuel Cells GA Whyatt LA Chick April 2012 PNNL-XXXXX Electrical Generation for More- Electric...

  8. Managing Carbon Regulatory Risk in Utility Resource Planning:Current Practices in the Western United States

    SciTech Connect (OSTI)

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-05-16T23:59:59.000Z

    Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. Assuch, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by fifteen electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without Federal climate regulation in the U.S., the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of U.S. electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations

  9. Managing Carbon Regulatory Risk in Utility Resource Planning: Current Practices in the Western United States

    SciTech Connect (OSTI)

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-07-11T23:59:59.000Z

    Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. As such, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by fifteen electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without Federal climate regulation in the U.S., the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of U.S. electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations.

  10. EIS-0150: Salt Lake City Area Integrated Projects Electric Power Marketing

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration prepared this environmental impact statement to analyze the environmental impacts of its proposal to establish the level of its commitment (sales) of long- term firm electrical capacity and energy from the Salt Lake City Area Integrated Projects hydroelectric power plants.

  11. Washington: Integrated Transportation Programs & Coordinated Regional

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your DensityEnergy U.S.-China Electric Vehicle and03/02Report |toVEHICLEof Energy Success Story-AFederal

  12. Random Walks and Electrical Networks Electrical Network

    E-Print Network [OSTI]

    Jonathon Peterson

    2008-01-30T23:59:59.000Z

    Feb 4, 2008 ... Random Walks and Electrical Networks. Hitting Probabilities and Voltage. Voltage. Connect a 1V battery to nodes a and b. ix,y is the current ...

  13. Coordinating a Constrained Channel with Linear Wholesale Price Contracts.

    E-Print Network [OSTI]

    Tsitsiklis, John

    Coordinating a Constrained Channel with Linear Wholesale Price Contracts. Navid Sabbaghi, Yossi, there is a set of linear wholesale price contracts that coordinates the channel while allowing the supplier-supplier/one-newsvendor channel configuration (with each supplier selling a unique product). We analyze how this set of wholesale

  14. Barycentric coordinates for Lagrange interpolation over lattices on a simplex

    E-Print Network [OSTI]

    Krajnc, Marjeta

    Barycentric coordinates for Lagrange interpolation over lattices on a simplex Gasper Jaklic (gasper on a simplex in Rd is studied. The lattice points are explicitly given in barycentric coordinates. This enables the construction and the efficient evaluation of the Lagrange interpolating polynomial over a lattice on a simplex

  15. AIAA-2002-5410 COORDINATION SPECIFICATION FOR DISTRIBUTED OPTIMAL

    E-Print Network [OSTI]

    Papalambros, Panos

    of the concurrency in the coordination is essential, in particular for large and non-hierarchic coordination architectures. This paper proposes to use concepts from communicating sequential processes (CSP) developed in concurrency theory. CSP allows the description of the MDO co- ordination as a number of parallel processes

  16. The coordinates of isolated accumulations are exactly computable real numbers

    E-Print Network [OSTI]

    Durand-Lose, Jérôme

    The coordinates of isolated accumulations are exactly computable real numbers J´er^ome Durand and Smale. The key is that accumulations can be de- vised to accelerate the computation and provide an exact for coordinates and speeds, the collections of positions of accumulations in both space and time are exactly

  17. Master of Arts in Liberal Studies Coordinated Study Grid

    E-Print Network [OSTI]

    Dasgupta, Dipankar

    Studies 3 UNIV 7200 Liberal Studies Seminar 3 UNIV 7996 Special Project 3 Coordinated Study ­ Courses a contract for a specific course of study leading to the Master of Arts in Liberal Studies; the Graduate must be approved by the Graduate Coordinator prior to certification for graduation. Student signature

  18. Article 003S02 Eye-hand coordination 1

    E-Print Network [OSTI]

    Henriques, Denise Y. P.

    Article 003S02 Eye-hand coordination 1 Correspondence and reprint requests to: J. Douglas Crawford by a Human Frontier Science Program Fellowship. Abstract Eye-hand coordination is complicated by the fact that the eyes are constantly in motion relative to the head.This poses problems in interpreting the spatial

  19. Electricity Restructuring: Deregulation or Reregulation?

    E-Print Network [OSTI]

    Borenstein, Severin; Bushnell, James

    2000-01-01T23:59:59.000Z

    14 Electricity Restructuring: Deregulation or Reregulation?be, synonymous with deregulation. Forthcoming in Regulation,Electricity Restructuring: Deregulation or Reregulation?

  20. Coordinating Tectons: Bipyridyl Terminated Allenylidene Complexes

    SciTech Connect (OSTI)

    Cifuentes, Marie P.; Humphrey, Mark G.; Koutsantonis, George A.; Lengkeek, Nigel A.; Petrie, Simon; Sanford, Vanessa; Schauer, Phil A.; Skelton, Brian W.; Stranger, Robert; White, Allan H. (UWA); (ANU)

    2009-01-15T23:59:59.000Z

    A series of complexes with {pi}-conjugated carbon chains terminated by bipyridyl moieties has been prepared. These allenylidene complexes were derived from 9-hydroxy-9-ethynyl-4,5-diazafluorene, the preparation of which is reported; the new allenylidene complexes are highly colored with the cumulated carbon chain terminating in a bipyridyl unit providing a site for further coordination. The synthesis, characterization, and X-ray structure determination of trans-[MCl(P{intersection}P){sub 2}{sub {double_bond}}C{sub {double_bond}}C{sub {double_bond}}(4,5-diazafluoren-9-yl)]PF{sub 6} (M = Ru, P{intersection}P = bis(diphenylphosphino)methane (dppm), 1,2-bis(diphenylphosphino)ethane (dppe), 1,2-bis(dimethylphosphino)ethane (dmpe); M = Os, P{intersection}P = dppm) are described. The effect of the variation in metal and ligand on electronic and electrochemical characteristics of these complexes has been investigated by using UV-vis, solution electrochemistry, and a combination of these techniques in spectroelectrochemical experiments. DFT calculations have been performed on trans-[RuCl(P{intersection}P){sub 2}{sub {double_bond}}C{sub {double_bond}}C{sub {double_bond}}(4,5-diazafluoren-9-yl)]{sup q} (P{intersection}P = dppm, bis(dimethylphosphino)methane (dmpm); q = -1, 0, +1, +2) and subsequently solvent-corrected calculations with use of COSMO were also undertaken to examine the nature of electronic transitions in various oxidation states.

  1. Federal Energy Resources Modernization Coordinating Committee

    SciTech Connect (OSTI)

    Parker, G.B.

    1993-04-01T23:59:59.000Z

    This report summarizes the broad range of activities that are focused on meeting the President's Executive Order on Federal Energy Management promulgated to meet energy savings goals and encourage more efficient management of all federal energy resources. These activities are reported semiannually under the auspices of the Federal Energy Resource Modernization (FERM) Coordinating Committee, and as such include activities undertaken from April 1, 1992, through September 30, 1992. The activities reported are classified into four major categories: (1) technology-base support, which includes development of processes, software, metering and monitoring equipment and strategies, and other tools for federal energy managers to better understand and characterize their energy resources; (2) federal energy systems testing and monitoring; (3) federal energy systems revitalization projects at federal installations in cooperation with the utilities serving the sites; and (4) energy supply, distribution and end-use conservation assessment for federal agencies and/or facilities. Lighting systems and air conditioning projects at federal facilities, especially military bases are updated.

  2. Emission vs Fermi coordinates: applications to relativistic positioning systems

    E-Print Network [OSTI]

    Donato Bini; Andrea Geralico; Matteo Luca Ruggiero; Angelo Tartaglia

    2008-09-05T23:59:59.000Z

    A 4-dimensional relativistic positioning system for a general spacetime is constructed by using the so called "emission coordinates". The results apply in a small region around the world line of an accelerated observer carrying a Fermi triad, as described by the Fermi metric. In the case of a Schwarzschild spacetime modeling the gravitational field around the Earth and an observer at rest at a fixed spacetime point, these coordinates realize a relativistic positioning system alternative to the current GPS system. The latter is indeed essentially conceived as Newtonian, so that it necessarily needs taking into account at least the most important relativistic effects through Post-Newtonian corrections to work properly. Previous results concerning emission coordinates in flat spacetime are thus extended to this more general situation. Furthermore, the mapping between spacetime coordinates and emission coordinates is completely determined by means of the world function, which in the case of a Fermi metric can be explicitly obtained.

  3. Winthrop Professor Lyle Noakes University of Western Australia

    E-Print Network [OSTI]

    Noakes, Lyle

    Winthrop Professor Lyle Noakes University of Western Australia School of Mathematics and Statistics­1970. Sheffield University, UK 1974­1975. University of Western Australia, 1975­2013. Visiting Appointments Perth, WA 6008, Australia. Phone: (+61 8) 6488 3358 Fax: (+61 8) 6488 1028 Email: Lyle

  4. New Recent Reports April 10, 2007 CSIS Western Hemisphere

    E-Print Network [OSTI]

    Texas at Austin, University of

    New Recent Reports April 10, 2007 CSIS Western Hemisphere National oil companies working paper OIES the importance of private investment, market determination, and appropriate regulatory oversight for Western to improved regional trade. Gains from trade in turn create increased incentives for private investment

  5. Deployment of Broadband Infrastructure in the Region of Western Greece

    E-Print Network [OSTI]

    Bouras, Christos

    Deployment of Broadband Infrastructure in the Region of Western Greece Antonios Alexiou1, Patras, Greece 3 University of Ioannina, Greece 4 University of Aegean, Greece {alexiua, bouras, igglesis that is taking place in the Region of Western Greece in order to develop state-of-the- art broadband

  6. area western norway: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    western norway First Page Previous Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Next Page Last Page Topic Index 1 Introduction The Western Gneiss Complex...

  7. Modeling thermal convection in supradetachment basins: example from western Norway

    E-Print Network [OSTI]

    Andersen, Torgeir Bjørge

    Modeling thermal convection in supradetachment basins: example from western Norway A. SOUCHE*, M. DABROWSKI AND T. B. ANDERSEN Physics of Geological Processes (PGP), University of Oslo, Oslo, Norway basins of western Norway are examples of supradetachment basins that formed in the hanging wall

  8. COORDINATING HUMAN AND MATERIAL RESOURCES Construction project management is the art of directing and coordinating human and material

    E-Print Network [OSTI]

    Simaan, Nabil

    COORDINATING HUMAN AND MATERIAL RESOURCES Construction project management is the art of directing and coordinating human and material resources throughout the life of a project by using modern management. Today's construction engineers and managers are faced with unprecedented challenges in planning

  9. Physical Impacts of Climate Change on the Western US Electricity System: A Scoping Study

    E-Print Network [OSTI]

    Coughlin, Katie

    2008-01-01T23:59:59.000Z

    Impacts on Regional Resource Assessment and Support for WGAtime frame, the Long Term Resource Assessment, and seasonalDevelopment Seasonal Resource Assessment Planning Area

  10. Physical Impacts of Climate Change on the Western US Electricity System: A Scoping Study

    E-Print Network [OSTI]

    Coughlin, Katie

    2008-01-01T23:59:59.000Z

    on the Columbia River Basin’s Water Resources. Nov. 2005caused by lack of cooling water and excessive demand, andserious threats to both water and power supply [36, 48]. Due

  11. Physical Impacts of Climate Change on the Western US Electricity System: A Scoping Study

    E-Print Network [OSTI]

    Coughlin, Katie

    2008-01-01T23:59:59.000Z

    on high-elevation hydropower generation in California’sCO2 [58] Solar Irradiance Hydropower Hadley et al. Franco &summer flows decrease hydropower production in summer and

  12. Physical Impacts of Climate Change on the Western US Electricity System: A Scoping Study

    E-Print Network [OSTI]

    Coughlin, Katie

    2008-01-01T23:59:59.000Z

    shortages caused by lack of cooling water and excessiveconstraints due to lack of cooling water Physical Impacts ofgeneration due to a lack of cooling water). It would thus be

  13. Physical Impacts of Climate Change on the Western US Electricity System: A Scoping Study

    E-Print Network [OSTI]

    Coughlin, Katie

    2008-01-01T23:59:59.000Z

    no clear trend in wind potential More precipitation falls aspotential impacts on wind power potential and on hydropower

  14. Audit of the Western Area Power Administration's Contract with Basin Electric Power Cooperative, IG-0409

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The FutureComments from TarasaName4Services Requirements DiscussedEnergy's

  15. Version 1 | November 2012Western Web Style Guide | The Department of Communications and Public Affairs | Western University | web@uwo.ca WEB STYLE GUIDE

    E-Print Network [OSTI]

    Sinnamon, Gordon J.

    Version 1 | November 2012Western Web Style Guide | The Department of Communications and Public Affairs | Western University | web@uwo.ca WEB STYLE GUIDE Standards and Resources for Creating Western's Web Experience #12;2Western Web Style Guide | The Department of Communications and Public Affairs

  16. Electric power monthly

    SciTech Connect (OSTI)

    NONE

    1995-08-01T23:59:59.000Z

    The Energy Information Administration (EIA) prepares the Electric Power Monthly (EPM) for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. This publication provides monthly statistics for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source, consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead.

  17. Integrated electrical connector

    DOE Patents [OSTI]

    Benett, William J.; Ackler, Harold D.

    2005-05-24T23:59:59.000Z

    An electrical connector is formed from a sheet of electrically conductive material that lies in between the two layers of nonconducting material that comprise the casing of an electrical chip. The connector is electrically connected to an electrical element embedded within the chip. An opening in the sheet is concentrically aligned with a pair of larger holes respectively bored through the nonconducting layers. The opening is also smaller than the diameter of an electrically conductive contact pin. However, the sheet is composed flexible material so that the opening adapts to the diameter of the pin when the pin is inserted therethrough. The periphery of the opening applies force to the sides of the pin when the pin is inserted, and thus holds the pin within the opening and in contact with the sheet, by friction. The pin can be withdrawn from the connector by applying sufficient axial force.

  18. Thermoacoustic magnetohydrodynamic electrical generator

    DOE Patents [OSTI]

    Wheatley, J.C.; Swift, G.W.; Migliori, A.

    1984-11-16T23:59:59.000Z

    A thermoacoustic magnetohydrodynamic electrical generator includes an intrinsically irreversible thermoacoustic heat engine coupled to a magnetohydrodynamic electrical generator. The heat engine includes an electrically conductive liquid metal as the working fluid and includes two heat exchange and thermoacoustic structure assemblies which drive the liquid in a push-pull arrangement to cause the liquid metal to oscillate at a resonant acoustic frequency on the order of 1000 Hz. The engine is positioned in the field of a magnet and is oriented such that the liquid metal oscillates in a direction orthogonal to the field of the magnet, whereby an alternating electrical potential is generated in the liquid metal. Low-loss, low-inductance electrical conductors electrically connected to opposite sides of the liquid metal conduct an output signal to a transformer adapted to convert the low-voltage, high-current output signal to a more usable higher voltage, lower current signal.

  19. Thermoacoustic magnetohydrodynamic electrical generator

    DOE Patents [OSTI]

    Wheatley, John C. (Los Alamos, NM); Swift, Gregory W. (Los Alamos, NM); Migliori, Albert (Santa Fe, NM)

    1986-01-01T23:59:59.000Z

    A thermoacoustic magnetohydrodynamic electrical generator includes an intrinsically irreversible thermoacoustic heat engine coupled to a magnetohydrodynamic electrical generator. The heat engine includes an electrically conductive liquid metal as the working fluid and includes two heat exchange and thermoacoustic structure assemblies which drive the liquid in a push-pull arrangement to cause the liquid metal to oscillate at a resonant acoustic frequency on the order of 1,000 Hz. The engine is positioned in the field of a magnet and is oriented such that the liquid metal oscillates in a direction orthogonal to the field of the magnet, whereby an alternating electrical potential is generated in the liquid metal. Low-loss, low-inductance electrical conductors electrically connected to opposite sides of the liquid metal conduct an output signal to a transformer adapted to convert the low-voltage, high-current output signal to a more usable higher voltage, lower current signal.

  20. Electrical system architecture

    DOE Patents [OSTI]

    Algrain, Marcelo C. (Peoria, IL); Johnson, Kris W. (Washington, IL); Akasam, Sivaprasad (Peoria, IL); Hoff, Brian D. (East Peoria, IL)

    2008-07-15T23:59:59.000Z

    An electrical system for a vehicle includes a first power source generating a first voltage level, the first power source being in electrical communication with a first bus. A second power source generates a second voltage level greater than the first voltage level, the second power source being in electrical communication with a second bus. A starter generator may be configured to provide power to at least one of the first bus and the second bus, and at least one additional power source may be configured to provide power to at least one of the first bus and the second bus. The electrical system also includes at least one power consumer in electrical communication with the first bus and at least one power consumer in electrical communication with the second bus.

  1. Evaluating North American Electric Grid Reliability Using the Barabasi-Albert Network Model

    SciTech Connect (OSTI)

    Chassin, David P.; Posse, Christian

    2005-09-15T23:59:59.000Z

    The reliability of electric transmission systems is examined using a scale-free model of network topology and failure propagation. The topologies of the North American eastern and western electric grids are analyzed to estimate their reliability based on the Barabási-Albert network model. A commonly used power system reliability index is computed using a simple failure propagation model. The results are compared to the values of power system reliability indices previously obtained using other methods and they suggest that scale-free network models are usable to estimate aggregate electric grid reliability.

  2. Evaluating North American Electric Grid Reliability Using the Barabasi-Albert Network Model

    E-Print Network [OSTI]

    David P. Chassin; Christian Posse

    2005-03-11T23:59:59.000Z

    The reliability of electric transmission systems is examined using a scale-free model of network structure and failure propagation. The topologies of the North American eastern and western electric networks are analyzed to estimate their reliability based on the Barabasi-Albert network model. A commonly used power system reliability index is computed using a simple failure propagation model. The results are compared to the values of power system reliability indices previously obtained using standard power system reliability analysis methods, and they suggest that scale-free network models are useful for estimating aggregate electric network reliability.

  3. Understanding Cognitive and Collaborative Work: Observations in an Electric Transmission Operations Control Center

    SciTech Connect (OSTI)

    Obradovich, Jodi H.

    2011-09-30T23:59:59.000Z

    This paper describes research that is part of an ongoing project to design tools to assist in the integration of renewable energy into the electric grid. These tools will support control room dispatchers in real-time system operations of the electric power transmission system which serves much of the Western United States. Field observations comprise the first phase of this research in which 15 operators have been observed over various shifts and times of day for approximately 90 hours. Findings describing some of the cognitive and environmental challenges of managing the dynamically changing electric grid are presented.

  4. Evaluating North American Electric Grid Reliability Using the Barabasi-Albert Network Model

    SciTech Connect (OSTI)

    Chassin, David P.; Posse, Christian

    2005-09-15T23:59:59.000Z

    The reliability of electric transmission systems is examined using a scale-free model of network topology and failure propagation. The topologies of the North American eastern and western electric grids are analyzed to estimate their reliability based on the Barabasi-Albert network model. A commonly used power system reliability index is computed using a simple failure propagation model. The results are compared to the values of power system reliability indices previously obtained using standard power engineering methods, and they suggest that scale-free network models are usable to estimate aggregate electric grid reliability.

  5. Energy 101: Electric Vehicles

    Office of Energy Efficiency and Renewable Energy (EERE)

    This edition of Energy 101 highlights the benefits of electric vehicles, including improved fuel efficiency, reduced emissions, and lower maintenance costs.

  6. Electrically Deformable Liquid Marbles

    E-Print Network [OSTI]

    Edward Bormashenko; Roman Pogreb; Tamir Stein; Gene Whyman; Marcelo Schiffer; Doron Aurbach

    2011-02-17T23:59:59.000Z

    Liquid marbles, which are droplets coated with a hydrophobic powder, were exposed to a uniform electric field. It was established that a threshold value of the electric field, 15 cgse, should be surmounted for deformation of liquid marbles. The shape of the marbles was described as a prolate spheroid. The semi-quantitative theory describing deformation of liquid marbles in a uniform electric field is presented. The scaling law relating the radius of the contact area of the marble to the applied electric field shows a satisfactory agreement with the experimental data.

  7. Electric Utility Industry Update

    Broader source: Energy.gov [DOE]

    Presentation—given at the April 2012 Federal Utility Partnership Working Group (FUPWG) meeting—covers significant electric industry trends and industry priorities with federal customers.

  8. Electric power annual 1992

    SciTech Connect (OSTI)

    Not Available

    1994-01-06T23:59:59.000Z

    The Electric Power Annual presents a summary of electric utility statistics at national, regional and State levels. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts and the general public with historical data that may be used in understanding US electricity markets. The Electric Power Annual is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. ``The US Electric Power Industry at a Glance`` section presents a profile of the electric power industry ownership and performance, and a review of key statistics for the year. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; retail sales; revenue; financial statistics; environmental statistics; electric power transactions; demand-side management; and nonutility power producers. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences in US electricity power systems. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. Monetary values in this publication are expressed in nominal terms.

  9. 2012 National Electricity Forum

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in your area, what are its consequences in terms of reliability, resource options, wholesale competition and market power, cost of electricity to consumers, environmental...

  10. Electricity | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the current electric grid into the next-generation grid. PE enable utilities to deliver power to their customers effectively while providing increased reliability, security, and...

  11. Joint Electrical Utilities (Iowa)

    Broader source: Energy.gov [DOE]

    Cities may establish utilities to acquire existing electric generating facilities or distribution systems. Acquisition, in this statute, is defined as city involvement, and includes purchase, lease...

  12. Integrating Electricity Subsector

    Broader source: Energy.gov (indexed) [DOE]

    2013 Electric Power Research Institute, Inc. All rights reserved. This publication is a corporate document that should be cited in the literature in the following manner:...

  13. Electric Transmission Lines (Nebraska)

    Broader source: Energy.gov [DOE]

    The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway crossings. This section contains general regulations...

  14. Electrically conductive cellulose composite

    DOE Patents [OSTI]

    Evans, Barbara R.; O'Neill, Hugh M.; Woodward, Jonathan

    2010-05-04T23:59:59.000Z

    An electrically conductive cellulose composite includes a cellulose matrix and an electrically conductive carbonaceous material incorporated into the cellulose matrix. The electrical conductivity of the cellulose composite is at least 10 .mu.S/cm at 25.degree. C. The composite can be made by incorporating the electrically conductive carbonaceous material into a culture medium with a cellulose-producing organism, such as Gluconoacetobacter hansenii. The composites can be used to form electrodes, such as for use in membrane electrode assemblies for fuel cells.

  15. Electrical Circuit Tester

    DOE Patents [OSTI]

    Love, Frank (Amarillo, TX)

    2006-04-18T23:59:59.000Z

    An electrical circuit testing device is provided, comprising a case, a digital voltage level testing circuit with a display means, a switch to initiate measurement using the device, a non-shorting switching means for selecting pre-determined electrical wiring configurations to be tested in an outlet, a terminal block, a five-pole electrical plug mounted on the case surface and a set of adapters that can be used for various multiple-pronged electrical outlet configurations for voltages from 100 600 VAC from 50 100 Hz.

  16. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electricity Monthly Update Explained Highlights The Highlights page features in the center a short article about a major event or an informative topic. The left column contains...

  17. User Electrical Equipment Inspections

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    user electronics that are not tested by a Nationally Recognized Testing Laboratory (NRTL). This includes any type of non-commercial, home-built electronic and electrical...

  18. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Percentage Btu Region map map showing electricity regions The chart above compares coal consumption in March 2014 and March 2015 by region and shows that coal consumption for...

  19. Electricity Monthly Update

    Gasoline and Diesel Fuel Update (EIA)

    a whole. Regional Wholesale Markets The fourth section presents data on the market making systems in the electric power sector: wholesale markets. It is not possible to show...

  20. Electricity | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    between two of history's most important energy-related engineers: Thomas Edison and Nikola Tesla. Edison and Tesla's developments in electric power generation and...