Powered by Deep Web Technologies
Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Case Study - Western Electricity Coordinating Council  

Broader source: Energy.gov (indexed) [DOE]

A Smart Grid Strategy for Assuring Reliability of the Western Grid The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and...

2

Topic A Awardee: Western Electricity Coordinating Council | Department...  

Broader source: Energy.gov (indexed) [DOE]

transmission plans for the Eastern and Western Interconnections, and for ERCOT. WECC received notification from the U.S. Department of Energy (DOE) on December 18, 2009...

3

Western Electricity Coordinating Council Smart Grid Project | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:SeadovCooperative Jump to: navigation,Western Cooling Efficiency Center Place: Davis,

4

Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council  

SciTech Connect (OSTI)

This report, Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council (WECC), was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). The intent of WECC’s work was to identify planning-level energy corridors that the Department of Energy (DOE) and its affiliates could study in greater detail. Argonne was tasked by DOE to analyze the WECC Proposed Energy Corridors in five topic areas for use in reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. In compliance with Section 368 of the Energy Policy Act of 2005 (EPAct), the Secretaries of Energy, Agriculture, and the Interior (Secretaries) published a Programmatic Environmental Impact Statement in 2008 to address the proposed designation of energy transport corridors on federal lands in the 11 western states. Subsequently, Records of Decision designating the corridors were issued in 2009 by the Bureau of Land Management (BLM) and the U.S. Forest Service (USFS). The 2012 settlement of a lawsuit, brought by The Wilderness Society and others against the United States, which identified environmental concerns for many of the corridors requires, among other things, periodic reviews of the corridors to assess the need for revisions, deletions, or additions. A 2013 Presidential Memorandum requires the Secretaries to undertake a continuing effort to identify and designate energy corridors. The WECC Proposed Energy Corridors and their analyses in this report provide key information for reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. Load centers and generation hubs identified in the WECC analysis, particularly as they reflect renewable energy development, would be useful in reviewing and potentially updating the designated Section 368 corridor network. Argonne used Geographic Information System (GIS) technology to analyze the proposed energy corridors in the WECC report in five topic areas: ? Federal land jurisdiction, ? Existing Section 368 corridors, ? Existing transmission lines, ? Previously studied corridor locations, and ? Protected areas. Analysis methods are explained and tables and maps are provided to describe the results of the analyses in all five topic areas. WECC used a rational approach to connecting the hubs it identified, although there may be opportunities for adapting some of the proposed WECC routes to previously designated Section 368 corridors, for example: ? The WECC proposed energy corridors are in fact centerlines of proposed routes connecting hubs of various descriptions related to electric energy transmission. Although the centerlines were sited to avoid sensitive areas, infrastructure proposed within actual pathways or corridors defined by the centerlines would sometimes affect lands where such development would not normally be allowed, such as National Parks and Monuments, National Wildlife Refuges, and Wilderness Areas. ? Many WECC proposed energy corridors are sited along centerlines of existing roads, including Interstate Highways, where in some cases additional width to accommodate energy transmission infrastructure may not be available. Examples include the WECC Proposed Corridor along Interstate 70 through Glenwood Canyon in Colorado, and along U.S. Highway 89 across Glen Canyon Dam in Arizona. ? Several WECC proposed energy corridors are parallel to designated Section 368 corridors that have already cleared the preliminary steps to right-of-way approval. In many of these cases, the WECC hub connection objectives can be met more efficiently by routing on the designated Section 368 corridors.

Kuiper, James A.; Cantwell, Brian J.; Hlava, Kevin J.; Moore, H Robert; Orr, Andrew B.; Zvolanek, Emily A.

2014-02-24T23:59:59.000Z

5

Transmission Planning Process and Opportunities for Utility-Scale Solar Engagement within the Western Electricity Coordinating Council (WECC)  

SciTech Connect (OSTI)

This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. Market barriers unrelated to technology often limit the expansion of utility-scale solar power, even in areas with exceptional resource potential. Many of these non-technical barriers have to do with policy, regulation, and planning, and hardly ever do they resolve themselves in a timely fashion. In most cases, pre-emptive intervention by interested stakeholders is the easiest way to remove/address such barriers, but it requires knowing how to navigate the institutional waters of the relevant agencies and boards. This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. It focuses on the Western Interconnection (WI), primarily because the quality of solar resources in the Southwest makes utility-scale concentrating solar power (CSP) and photovoltaics (PV) economically feasible, and because the relevant institutions have evolved in a way that has opened up opportunities for removing non-technical market barriers. Developers will find in this report a high-level field manual to identify the venues for mitigating and possibly eliminating systemic market obstacles and ensuring that the economic playing field is reasonably level. Project-specific issues such as siting for transmission and generation resources are beyond the scope of this report. Instead, the aim is to examine issues that pervasively affect all utility-scale PV and CSP in the region regardless of where the project may be. While the focus is on the WI, many of the institutions described here also have their counterparts in the Eastern and the Texas interconnections. Specifically, this report suggests a number of critical engagement points relating to generation and transmission planning.

Hein, J.; Hurlbut, D.; Milligan, M.; Coles, L.; Green, B.

2011-11-01T23:59:59.000Z

6

Western Massachusetts Electric- Commercial Energy Efficiency Rebates  

Broader source: Energy.gov [DOE]

Western Massachusetts Electric (WMECO) helps commercial and industrial customers offset the additional costs of purchasing and installing energy efficient equipment. WMECO offers rebates for...

7

Case Study - Western Electricity Coordinating Council  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' ResearchTheMarketing,Energy-ChevronSeveral salesCarolyn L.in a Textile PlantPumpSmart

8

Western Electricity Coordinating Council | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 South Place: SaltTroyer & AssociatesWest CentralUkinrekWestCoop

9

Electricity markets in the western United States  

SciTech Connect (OSTI)

This article introduces the use of rigorous econometric tools to understand the geographic scope of the market for generation services. These tools are applied to data from the current wholesale electricity market in the western United States. The behavior of the current wholesale electricity market and the methods used to assess the expanse of the geographic market in the current wholesale electricity market can go a long way toward informing the discussion of pricing behavior and performance in a restructured electricity industry. First, the current wholesale electricity market is already effectively unregulated and suffers from the same technical complexities that face a retail electricity market. Consequently, understanding the supply and demand conditions that cause the extent of the geographic market for generation services to narrow in the current wholesale electricity market can shed light on which times the geographic expanse of the market may narrow in a restructures electricity market. Second, the techniques developed in this paper to assess the extent of the current wholesale electricity market can be applied readily to a restructured electricity market. Finally, because market conditions in the electricity industry are likely to change significantly in the next few years, as the structure of the electricity sector changes dramatically, this analysis of the geographic expanse of the market can provide a useful benchmark against which to compare post-restructuring wholesale price relationships.

Bailey, E.M.

1998-07-01T23:59:59.000Z

10

Simulating the Impact of a Carbon Market Electricity System in the Western U.S.A.  

E-Print Network [OSTI]

and engineering methods. This approach has been implemented in a model of the WECC, the Western Electricity Coordinating Council. The methods and assumptions of the WECC model are explained in the appendicies Act C. Electricity Generation 4. Could We See Similar Results in the WECC? D. Wholesale and Retail

Ford, Andrew

11

NorthWestern Energy Community Works Scholarship for Electrical Engineering  

E-Print Network [OSTI]

20131030 NorthWestern Energy Community Works Scholarship for Electrical Engineering A special Electrical Engineering, NorthWestern Energy has established a scholarship program administered by the Montana. NorthWestern Energy is an investor-owned utility and one of the largest providers of electricity

Dyer, Bill

12

NorthWestern Energy Community Works Scholarship for Electrical Engineering  

E-Print Network [OSTI]

20121204 NorthWestern Energy Community Works Scholarship for Electrical Engineering A special new Electrical Engineering, NorthWestern Energy has established a scholarship program administered by the Montana. NorthWestern Energy is an investor-owned utility and one of the largest providers of electricity

Lawrence, Rick L.

13

Western Massachusetts Electric- Residential Energy Efficiency Rebate Program  

Broader source: Energy.gov [DOE]

Western Massachusetts Electric (WMECO) and Masssave, a collaboration of Massachusetts municipalities and cooperatives, provides technical assistance and financial incentives to customers who...

14

100 Area electrical distribution fault and coordination report  

SciTech Connect (OSTI)

This report documents three-phase and line-to-ground fault values and time overcurrent coordination curves for the electrical utility distribution system located in the 100 Areas. Activities that may improve the coordination of the distribution system have also been identified. An evaluation of system coordination was performed. The results of this evaluation are listed in Appendix B. There are protective devices within the 100 Area distribution system that do not coordinate with one another throughout the Areas. There is also a mis-application of reclosing relays at the 100B Area. The impact of the mis-coordination and incorrect application of reclosing relays is that system selectivity is reduced. Equipment will still be protected against damaging currents, however more equipment will be de-energized than necessary during fault conditions. It is the opinion of the author of this report that the cases of mis-coordination listed above, and in Appendix B, do not significantly degrade the system protection system nor the reliability of the 100 Area distribution system. Therefore, immediate response to correct these problems is not recommended. However, a planned methodology, outlined in an Activity Plan, to correct these problems should be developed and implemented in the near future.

Webber, J.J. [ICF Kaiser Hanford Co., Richland, WA (United States)

1994-09-23T23:59:59.000Z

15

Methodology The electricity generation and distribution network in the Western United States is  

E-Print Network [OSTI]

Methodology The electricity generation and distribution network in the Western United States is comprised of power plants, electric utilities, electrical transformers, transmission and distribution infrastructure, etc. We conceptualize the system as a transportation network with resources (electricity

Hall, Sharon J.

16

Topic A Awardee: Western Electricity Coordinating Council | Department of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 th ,Top Value Added Chemicals

17

WECC releases its first-ever transmission plan for the Western Interconnection  

Broader source: Energy.gov [DOE]

The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection.

18

Physical Impacts of Climate Change on the Western US Electricity System: A Scoping Study  

SciTech Connect (OSTI)

This paper presents an exploratory study of the possible physical impacts of climate change on the electric power system, and how these impacts could be incorporated into resource planning in the Western United States. While many aspects of climate change and energy have been discussed in the literature, there has not yet been a systematic review of the relationship between specific physical effects and the quantitative analyses that are commonly used in planning studies. The core of the problem is to understand how the electric system is vulnerable to physical weather risk, and how to make use of information from climate models to characterize the way these risks may evolve over time, including a treatment of uncertainty. In this paper, to provide the necessary technical background in climate science, we present an overview of the basic physics of climate and explain some of the methodologies used in climate modeling studies, particularly the importance of emissions scenarios. We also provide a brief survey of recent climate-related studies relevant to electric system planning in the Western US. To define the institutional context, we discuss the core elements of the resource and reliability planning processes used currently by utilities and by the Western Electricity Coordinating Council. To illustrate more precisely how climate-related risk could be incorporated into modeling exercises, we discuss three idealized examples. Overall, we argue that existing methods of analysis can and should be extended to encompass the uncertainties related to future climate. While the focus here is on risk related to physical impacts, the same principles apply to a consideration of how future climate change policy decisions might impact the design and functioning of the electric grid. We conclude with some suggestions and recommendations on how to begin developing this approach within the existing electric system planning framework for the West.

Coughlin, Katie; Goldman, Charles

2008-12-01T23:59:59.000Z

19

Comments by the American Electric Power System on Proposed Coordination of Federal Authorizations for Electric Transmission Facilities  

Broader source: Energy.gov [DOE]

 Proposed Coordination of Federal Authorizations for Electric Transmission Facilities – Interim Final Rule and Proposed Rule (DOE, 10 CR Part 900): The utility operating companies of the American...

20

On Coordinating Electricity Markets: Smart Power Scheduling for Demand Side Management and Economic Dispatch  

E-Print Network [OSTI]

On Coordinating Electricity Markets: Smart Power Scheduling for Demand Side Management and Economic;On Coordinating Electricity Markets: Smart Power Scheduling for Demand Side Management and Economic Dispatch Abstract Information asymmetry in retail electricity markets is one of the largest sources of inef

Chen, Yiling

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

2012 National Electricity Forum  

Broader source: Energy.gov (indexed) [DOE]

Project Development, Pacific Gas & Electric * Brad Nickell, Director of Planning, Western Electricity Coordinating Council 12:00 pm - 12:30 pm Audience comments 12:30 pm Adjourn 1...

22

Analysis of drought impacts on electricity production in the Western and Texas interconnections of the United States.  

SciTech Connect (OSTI)

Electricity generation relies heavily on water resources and their availability. To examine the interdependence of energy and water in the electricity context, the impacts of a severe drought to assess the risk posed by drought to electricity generation within the western and Texas interconnections has been examined. The historical drought patterns in the western United States were analyzed, and the risk posed by drought to electricity generation within the region was evaluated. The results of this effort will be used to develop scenarios for medium- and long-term transmission modeling and planning efforts by the Western Electricity Coordination Council (WECC) and the Electric Reliability Council of Texas (ERCOT). The study was performed in response to a request developed by the Western Governors Association in conjunction with the transmission modeling teams at the participating interconnections. It is part of a U.S. Department of Energy-sponsored, national laboratory-led research effort to develop tools related to the interdependency of energy and water as part of a larger interconnection-wide transmission planning project funded under the American Recovery and Reinvestment Act. This study accomplished three main objectives. It provided a thorough literature review of recent studies of drought and the potential implications for electricity generation. It analyzed historical drought patterns in the western United States and used the results to develop three design drought scenarios. Finally, it quantified the risk to electricity generation for each of eight basins for each of the three drought scenarios and considered the implications for transmission planning. Literature on drought impacts on electricity generation describes a number of examples where hydroelectric generation capacity has been limited because of drought but only a few examples of impact on thermoelectric generation. In all documented cases, shortfalls of generation were met by purchasing power from the market, albeit at higher prices. However, sufficient excess generation and transmission must be available for this strategy to work. Although power purchase was the most commonly discussed drought mitigation strategy, a total of 12 response strategies were identified in the literature, falling into four main categories: electricity supply, electricity demand response, alternative water supplies, and water demand response. Three hydrological drought scenarios were developed based on a literature review and historical data analysis. The literature review helped to identify key drought parameters and data on drought frequency and severity. Historical hydrological drought data were analyzed for the western United States to identify potential drought correlations and estimate drought parameters. The first scenario was a West-wide drought occurring in 1977; it represented a severe drought in five of the eight basins in the study area. A second drought scenario was artificially defined by selecting the conditions from the 10th-percentile drought year for each individual basin; this drought was defined in this way to allow more consistent analysis of risk to electricity generation in each basin. The final scenario was based upon the current low-flow hydro modeling scenario defined by WECC, which uses conditions from the year 2001. These scenarios were then used to quantify the risk to electricity generation in each basin. The risk calculations represent a first-order estimate of the maximum amount of electricity generation that might be lost from both hydroelectric and thermoelectric sources under a worst-case scenario. Even with the conservative methodology used, the majority of basins showed a limited amount of risk under most scenarios. The level of risk in these basins is likely to be amenable to mitigation by known strategies, combined with existing reserve generation and transmission capacity. However, the risks to the Pacific Northwest and Texas Basins require further study. The Pacific Northwest is vulnerable because of its heavy reliance on hydroelectri

Harto, C. B.; Yan, Y. E.; Demissie, Y. K.; Elcock, D.; Tidwell, V. C.; Hallett, K.; Macknick, J.; Wigmosta, M. S.; Tesfa, T. K. (Environmental Science Division); (Sandia National Laboratory); (National Renewable Energy Laboratory); (Pacific Northwest National Laboratory)

2012-02-09T23:59:59.000Z

23

Combining Balancing Areas' Variability: Impacts on Wind Integration in the Western Interconnection  

SciTech Connect (OSTI)

This paper investigates the potential impact of balancing area cooperation on a large-scale in the Western Electricity Coordinating Council (WECC).

Milligan, M.; Kirby, B.; Beuning, S.

2010-07-01T23:59:59.000Z

24

Title 10 CFR 900 Coordination of Federal Authorizations for Electric  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen,Ltd Jump JumpAl., 1978)TillmanMunicipal Electric Util JumpTitan|

25

National Electric Transmission Study 2006 Western Interconnection Analysis  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalanced Scorecard Federal2 to:DieselEnergy AuditorWestern Interconnection 2006

26

Impacts of Western Area Power Administration`s power marketing alternatives on electric utility systems  

SciTech Connect (OSTI)

This technical memorandum estimates the effects of alternative contractual commitments that may be initiated by the Western Area Power Administration`s Salt Lake City Area Office. It also studies hydropower operational restrictions at the Salt Lake City Area Integrated Projects in combination with these alternatives. Power marketing and hydropower operational effects are estimated in support of Western`s Electric Power Marketing Environmental Impact Statement (EIS). Electricity production and capacity expansion for utility systems that will be directly affected by alternatives specified in the EIS are simulated. Cost estimates are presented by utility type and for various activities such as capacity expansion, generation, long-term firm purchases and sales, fixed operation and maintenance expenses, and spot market activities. Operational changes at hydropower facilities are also investigated.

Veselka, T.D.; Portante, E.C.; Koritarov, V. [and others

1995-03-01T23:59:59.000Z

27

National Electric Transmission Congestion Study 2012 Western Workshops  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalanced Scorecard Federal2 to:DieselEnergy Auditor U.S.ElectricEXECUTIVE

28

Western Coop Electric Assn Inc | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 South Place: SaltTroyer & AssociatesWest CentralUkinrekWestCoop Electric

29

Water effects of the use of western coal for electrical production  

SciTech Connect (OSTI)

Water may be a constraint on the expanded development of coal resources in the semi-arid western United States. Water allocation in the West has been determined by the appropriative rights doctrine which allows perpetual use of water sources by those who first claim it for beneficial purposes. This has had the effect of placing a dominative interest in water allocation in one economic sector: agriculture. New water sources are available to coal producers but political and economic problems must be overcome. Water is required by every phase of coal development. Mines use water for dust control and land reclamation. Coal slurry pipelines would use water as a transport medium. Steam electric power plants use water for cooling, cleaning, and in the boiler. Coal gasification plants would use water for cooling, cleaning, and as a material input. In addition to these direct uses of water by coal development, the people who build and operate the development demand water for domestic and recreational purposes. The quantity of water required for a given element of a coal development is site specific and dependent on many factors. The available literature cites a range of estimates of the amount of water required for each type of development. The width of this range seems related to the stage of development of the particular technology. Estimates of water requirements for various schemes to provide an average electrical load of 9 GWe to a load center 1000 miles from western mines are shown in Table 5.

Rogers, E.A.

1980-02-01T23:59:59.000Z

30

Regional economic impacts of changes in electricity rates resulting from Western Area Power Administration`s power marketing alternatives  

SciTech Connect (OSTI)

This technical memorandum describes an analysis of regional economic impacts resulting from changes in retail electricity rates due to six power marketing programs proposed by Western Area Power Administration (Western). Regional economic impacts of changes in rates are estimated in terms of five key regional economic variables: population, gross regional product, disposable income, employment, and household income. The REMI (Regional Impact Models, Inc.) and IMPLAN (Impact Analysis for Planning) models simulate economic impacts in nine subregions in the area in which Western power is sold for the years 1993, 2000, and 2008. Estimates show that impacts on aggregate economic activity in any of the subregions or years would be minimal for three reasons. First, the utilities that buy power from Western sell only a relatively small proportion of the total electricity sold in any of the subregions. Second, reliance of Western customers on Western power is fairly low in each subregion. Finally, electricity is not a significant input cost for any industry or for households in any subregion.

Allison, T.; Griffes, P.; Edwards, B.K.

1995-03-01T23:59:59.000Z

31

Clean Energy, Dirty Air: A Policy Coordination Problem between Renewable-Based Electricity Programs and Cap-and-Trade Pollution Programs  

E-Print Network [OSTI]

Clean Energy, Dirty Air: A Policy Coordination Problem between Renewable-Based Electricity Programs) or an energy journal (Energy Policy). #12; of programs--utility-based green electricity programs and state-based renewable portfolio standards

Edwards, Paul N.

32

SCENARIOS FOR DEEP CARBON EMISSION REDUCTIONS FROM ELECTRICITY BY 2050 IN WESTERN NORTH AMERICA USING THE SWITCH ELECTRIC POWER SECTOR PLANNING MODEL California's Carbon Challenge Phase II Volume II  

SciTech Connect (OSTI)

This study used a state-of-the-art planning model called SWITCH for the electric power system to investigate the evolution of the power systems of California and western North America from present-day to 2050 in the context of deep decarbonization of the economy. Researchers concluded that drastic power system carbon emission reductions were feasible by 2050 under a wide range of possible futures. The average cost of power in 2050 would range between $149 to $232 per megawatt hour across scenarios, a 21 to 88 percent increase relative to a business-as-usual scenario, and a 38 to 115 percent increase relative to the present-day cost of power. The power system would need to undergo sweeping change to rapidly decarbonize. Between present-day and 2030 the evolution of the Western Electricity Coordinating Council power system was dominated by implementing aggressive energy efficiency measures, installing renewable energy and gas-fired generation facilities and retiring coal-fired generation. Deploying wind, solar and geothermal power in the 2040 timeframe reduced power system emissions by displacing gas-fired generation. This trend continued for wind and solar in the 2050 timeframe but was accompanied by large amounts of new storage and long-distance high-voltage transmission capacity. Electricity storage was used primarily to move solar energy from the daytime into the night to charge electric vehicles and meet demand from electrified heating. Transmission capacity over the California border increased by 40 - 220 percent by 2050, implying that transmission siting, permitting, and regional cooperation will become increasingly important. California remained a net electricity importer in all scenarios investigated. Wind and solar power were key elements in power system decarbonization in 2050 if no new nuclear capacity was built. The amount of installed gas capacity remained relatively constant between present-day and 2050, although carbon capture and sequestration was installed on some gas plants by 2050.

Collaboration/ University of California, Berkeley; Nelson, James; Mileva, Ana; Johnston, Josiah; Kammen, Daniel; Wei, Max; Greenblatt, Jeffrey

2014-01-01T23:59:59.000Z

33

Estimation of Relative Position and Coordination of Mobile Underwater Robotic Platforms through Electric Sensing  

E-Print Network [OSTI]

Electric Sensing Yannick Morel, Mathieu Porez, and Auke J. Ijspeert Abstract-- In the context of underwater this issue, we propose the use of electric sensing, with a technique inspired by weakly electric fishes. In particular, the approach relies on one or several of the agents applying an electric field

Boyer, Edmond

34

Locational-based Coupling of Electricity Markets: Benefits from Coordinating Unit Commitment and Balancing Markets  

E-Print Network [OSTI]

We formulate a series of stochastic models for committing and dispatching electric generators subject to transmission limits. The models are used to estimate the benefits of electricity locational marginal pricing (LMP) that arise from better...

van der Weijde, Adriaan Hendrik; Hobbs, Benjamin F.

35

NorthWestern Energy (Electric)- Commercial Energy Efficiency Rebate Program (Montana)  

Broader source: Energy.gov [DOE]

NorthWestern Energy offers multiple rebate programs for commercial and industrial customers to make energy efficient improvements to their businesses. This includes lighting, heating, irrigators,...

36

Sixth Northwest Conservation and Electric Power Plan Chapter 7: Transmission  

E-Print Network [OSTI]

, there has been significant progress in both areas. The Western Electricity Coordinating Council (WECC) has and significant progress in the last five years. Both regional and WECC-wide organizations have been created

37

ELECTR-5939; No of Pages 6 Please cite this article in press as: A. Sopinka, Variable Energy Resources: VERy Interesting Implications for the Western Interconnect, Electr. J. (2013), http://dx.doi.org/10.1016/j.tej.2013.04.015  

E-Print Network [OSTI]

Resources: VERy Interesting Implications for the Western Interconnect, Electr. J. (2013), http Interconnect Variable energy resources (VERs) are growing in the Western Interconnect. To backstop The North American bulk power system is comprised of four interconnected regions: the Western Interconnect

Pedersen, Tom

38

Dynamic Interactions in the Western United States Electricity Spot Markets Christine A. Jerko  

E-Print Network [OSTI]

to be the dominant market in the long run in both seasons. Key words: electricity prices, directed graphs, vector of the electricity industry and its impact on electricity prices is a subject of considerable interest, especially given the recent electricity price spikes occurring in California and elsewhere. Weron (2000) notes

39

Physical Impacts of Climate Change on the Western US Electricity System: A Scoping Study  

E-Print Network [OSTI]

Lett. 34:L19703. [46] WECC 2005. Power Supply Assessment.=index&req=getit&lid [56] WECC Planning Data White Paper,Coordinating Council (WECC) [46, 55, 56], while our

Coughlin, Katie

2008-01-01T23:59:59.000Z

40

Abstract--The California Independent System Operator Corporation (CAISO) is in charge of managing the electricity  

E-Print Network [OSTI]

the entire WECC network and consists of the detailed representation of the CAISO control grid and a simplified representation of the WECC (Western Electricity Coordinating Council) bulk power system. Creating

McCalley, James D.

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Office of Inspector General report on audit of the Western Area Power Administration`s contract with Basin Electric Power Cooperative  

SciTech Connect (OSTI)

At the request of the Western Area Power Administration (Western), an audit of 17 areas was conducted with respect to possible overcharges on a power contract between Western and Basin Electric Power Cooperative (Basin), Contract No. DE-MP65-82WP-19001. The contract for Western`s purchase of electric power from Basin was entered into on April 15, 1982, and was in effect from January 1, 1986, through October 31, 1990. During this 58-month period, Basin billed Western approximately $197.6 million. Overall, it was found that Basin overcharged Western approximately $23.8 million. These overcharges occurred because Basin: (1) did not recognize or amortize as gain its overestimate of completion and correction costs for Antelope Valley Station (AVS) Unit 2; (2) did not amortize the gain on the sale/leaseback of AVS Unit 2 as an offset to lease costs; (3) billed Western prematurely for lease and interest costs; (4) overcharged for the cost of coal by including administrative and general expenses and profit, as well as incorrectly calculating discounts, royalty payments, and imputed interest costs; (5) made faulty calculations of amortization rates for deferred costs; (6) used a shorter depreciation period for AVS common facilities than it had used for other power plants; (7) retained tax benefit transfers; and (8) charged Western for interest and depreciation that had been paid by others. In addition to the $23.8 million in overcharges, interest accrued on the overcharges through December 31, 1996 was estimated to be approximately $22.1 million, resulting in a total of $45.9 million due Western.

NONE

1997-06-25T23:59:59.000Z

42

Integrated Energy-Water Planning in the Western and Texas Interconnections  

SciTech Connect (OSTI)

While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, and reliability, issues concerning the availability of water represent an emerging issue. Thermoelectric expansion must be considered in the context of competing demands from other water use sectors balanced with fresh and non-fresh water supplies subject to climate variability. An integrated Energy-Water Decision Support System (DSS) is being developed that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water availability and cost for long-range transmission planning. The project brings together electric transmission planners (Western Electricity Coordinating Council and Electric Reliability Council of Texas) with western water planners (Western Governors’ Association and the Western States Water Council). This paper lays out the basic framework for this integrated Energy-Water DSS.

Vincent Tidwell; John Gasper; Robert Goldstein; Jordan Macknick; Gerald Sehlke; Michael Webber; Mark Wigmosta

2013-07-01T23:59:59.000Z

43

Energy and water in the Western and Texas interconnects.  

SciTech Connect (OSTI)

The Department of Energy's Office of Electricity has initiated a $60M program to assist the electric industry in interconnection-level analysis and planning. The objective of this effort is to facilitate the development or strengthening of capabilities in each of the three interconnections serving the lower 48 states of the United States, to prepare analyses of transmission requirements under a broad range of alternative futures and develop long-term interconnection-wide transmission expansion plans. The interconnections are the Western Interconnection, the Eastern Interconnection, and the Texas Interconnection. One element of this program address the support and development of an integrated energy-water Decision Support System (DSS) that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water stress for transmission and resource planning (the Eastern Interconnection is not participating in this element). Specific objectives include: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between members of this proposal team and the Western Electricity Coordinating Council (WECC), Western Governors Association (WGA), the Electric Reliability Council of Texas (ERCOT) and their associated stakeholder teams. (3) Exercise the Energy-Water DSS to investigate water stress implications of the transmission planning scenarios put forward by WECC, WGA, and ERCOT. The goals of this project are: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between Western Electricity Coordinating Council, Electric Reliability Council of Texas, Western Governors Association, and Western States Water Council. (3) Exercise the Energy-Water DSS to investigate water transmission planning scenarios.

Tidwell, Vincent Carroll

2010-08-01T23:59:59.000Z

44

Geothermal energy in the western United States and Hawaii: Resources and projected electricity generation supplies. [Contains glossary and address list of geothermal project developers and owners  

SciTech Connect (OSTI)

Geothermal energy comes from the internal heat of the Earth, and has been continuously exploited for the production of electricity in the United States since 1960. Currently, geothermal power is one of the ready-to-use baseload electricity generating technologies that is competing in the western United States with fossil fuel, nuclear and hydroelectric generation technologies to provide utilities and their customers with a reliable and economic source of electric power. Furthermore, the development of domestic geothermal resources, as an alternative to fossil fuel combustion technologies, has a number of associated environmental benefits. This report serves two functions. First, it provides a description of geothermal technology and a progress report on the commercial status of geothermal electric power generation. Second, it addresses the question of how much electricity might be competitively produced from the geothermal resource base. 19 figs., 15 tabs.

Not Available

1991-09-01T23:59:59.000Z

45

Analysis of Critical Permeabilty, Capillary Pressure and Electrical Properties for Mesaverde Tight Gas Sandstones from Western U.S. Basins  

SciTech Connect (OSTI)

Although prediction of future natural gas supply is complicated by uncertainty in such variables as demand, liquefied natural gas supply price and availability, coalbed methane and gas shale development rate, and pipeline availability, all U.S. Energy Information Administration gas supply estimates to date have predicted that Unconventional gas sources will be the dominant source of U.S. natural gas supply for at least the next two decades (Fig. 1.1; the period of estimation). Among the Unconventional gas supply sources, Tight Gas Sandstones (TGS) will represent 50-70% of the Unconventional gas supply in this time period (Fig. 1.2). Rocky Mountain TGS are estimated to be approximately 70% of the total TGS resource base (USEIA, 2005) and the Mesaverde Group (Mesaverde) sandstones represent the principal gas productive sandstone unit in the largest Western U.S. TGS basins including the basins that are the focus of this study (Washakie, Uinta, Piceance, northern Greater Green River, Wind River, Powder River). Industry assessment of the regional gas resource, projection of future gas supply, and exploration programs require an understanding of reservoir properties and accurate tools for formation evaluation. The goal of this study is to provide petrophysical formation evaluation tools related to relative permeability, capillary pressure, electrical properties and algorithms for wireline log analysis. Detailed and accurate moveable gas-in-place resource assessment is most critical in marginal gas plays and there is need for quantitative tools for definition of limits on gas producibility due to technology and rock physics and for defining water saturation. The results of this study address fundamental questions concerning: (1) gas storage; (2) gas flow; (3) capillary pressure; (4) electrical properties; (5) facies and upscaling issues; (6) wireline log interpretation algorithms; and (7) providing a web-accessible database of advanced rock properties. The following text briefly discusses the nature of these questions. Section I.2 briefly discusses the objective of the study with respect to the problems reviewed.

Alan Byrnes; Robert Cluff; John Webb; John Victorine; Ken Stalder; Daniel Osburn; Andrew Knoderer; Owen Metheny; Troy Hommertzheim; Joshua Byrnes; Daniel Krygowski; Stefani Whittaker

2008-06-30T23:59:59.000Z

46

Docket No. PA02-2-000 Price Manipulation in Western MarketsV-1 V. The Influence of Electricity Spot Prices on Electricity  

E-Print Network [OSTI]

of Electricity Spot Prices on Electricity Forward Prices Summary of Results The vital link between the spot price electric prices today and the forward price of electricity. Instead, forward prices should mostly reflect electricity in the West, forward gas prices should, in large part, explain forward electricity prices. Our

Laughlin, Robert B.

47

The Dynamic Template Mechanism - A Co-Ordination Role for Shear, Thermal and Electrical Stressors in Muscle Cell Contraction  

E-Print Network [OSTI]

The Dynamic Template is applied to muscle cells, and is shown to provide a feedback mechanism that can co-ordinate the rearrangements of cytoskeletal proteins that accompany contraction

J. T. Lofthouse

2008-07-12T23:59:59.000Z

48

Coordinated Control and Optimization of Virtual Power Plants for Energy and Frequency Regulation Services in Electricity Markets  

E-Print Network [OSTI]

and bidding strategy for VPPs to provide energy balancing and grid frequency regulation services in electricity market environment. In this thesis, the VPP consists of two energy conversion assets: a Doubly Fed Induction Generator (DFIG)-based wind farm and a...

Zhang, Fan

2012-02-14T23:59:59.000Z

49

Multi-Agent Based Techniques for Coordinating the Distribution of Electricity in a Micro-Grid Environment  

E-Print Network [OSTI]

an increasing demand for electric heating technolo- gies such as ground-source and air-source heat pumps (Dep, such as the electrification of home heating and vehi- cles, will need to be introduced. This increase in demand emmissions, the majority of which is a consequence of heating living spaces and water (Gov, 2009). Currently

Southampton, University of

50

Development of a Hydrogasification Process for Co-Production of Substitute Natural Gas (SNG) and Electric Power from Western Coals  

SciTech Connect (OSTI)

This report presents the results of the research and development conducted on an Advanced Hydrogasification Process (AHP) conceived and developed by Arizona Public Service Company (APS) under U.S. Department of Energy (DOE) contract: DE-FC26-06NT42759 for Substitute Natural Gas (SNG) production from western coal. A double-wall (i.e., a hydrogasification contained within a pressure shell) down-flow hydrogasification reactor was designed, engineered, constructed, commissioned and operated by APS, Phoenix, AZ. The reactor is ASME-certified under Section VIII with a rating of 1150 pounds per square inch gage (psig) maximum allowable working pressure at 1950 degrees Fahrenheit ({degrees}F). The reaction zone had a 1.75 inch inner diameter and 13 feet length. The initial testing of a sub-bituminous coal demonstrated ~ 50% carbon conversion and ~10% methane yield in the product gas under 1625{degrees}F, 1000 psig pressure, with a 11 seconds (s) residence time, and 0.4 hydrogen-to-coal mass ratio. Liquid by-products mainly contained Benzene, Toluene, Xylene (BTX) and tar. Char collected from the bottom of the reactor had 9000-British thermal units per pound (Btu/lb) heating value. A three-dimensional (3D) computational fluid dynamic model simulation of the hydrodynamics around the reactor head was utilized to design the nozzles for injecting the hydrogen into the gasifier to optimize gas-solid mixing to achieve improved carbon conversion. The report also presents the evaluation of using algae for carbon dioxide (CO{sub 2}) management and biofuel production. Nannochloropsis, Selenastrum and Scenedesmus were determined to be the best algae strains for the project purpose and were studied in an outdoor system which included a 6-meter (6M) radius cultivator with a total surface area of 113 square meters (m{sup 2}) and a total culture volume between 10,000 to 15,000 liters (L); a CO{sub 2} on-demand feeding system; an on-line data collection system for temperature, pH, Photosynthetically Activate Radiation (PAR) and dissolved oxygen (DO); and a ~2 gallons per minute (gpm) algae culture dewatering system. Among the three algae strains, Scenedesmus showed the most tolerance to temperature and irradiance conditions in Phoenix and the best self-settling characteristics. Experimental findings and operational strategies determined through these tests guided the operation of the algae cultivation system for the scale-up study. Effect of power plant flue gas, especially heavy metals, on algae growth and biomass adsorption were evaluated as well.

Sun, Xiaolei; Rink, Nancy

2011-04-30T23:59:59.000Z

51

Examination of Potential Benefits of an Energy Imbalance Market in the Western Interconnection  

SciTech Connect (OSTI)

In the Western Interconnection, there is significant interest in improving approaches to wide-area coordinated operations of the bulk electric power system, in part because of the increasing penetration of variable generation. One proposed solution is an energy imbalance market. This study focused on that approach alone, with the goal of identifying the potential benefits of an energy imbalance market in the year 2020.

Milligan, M.; Clark, K.; King, J.; Kirby, B.; Guo, T.; Liu, G.

2013-03-01T23:59:59.000Z

52

Analysis of Cycling Costs in Western Wind and Solar Integration Study  

SciTech Connect (OSTI)

The Western Wind and Solar Integration Study (WWSIS) examined the impact of up to 30% penetration of variable renewable generation on the Western Electricity Coordinating Council system. Although start-up costs and higher operating costs because of part-load operation of thermal generators were included in the analysis, further investigation of additional costs associated with thermal unit cycling was deemed worthwhile. These additional cycling costs can be attributed to increases in capital as well as operations and maintenance costs because of wear and tear associated with increased unit cycling. This analysis examines the additional cycling costs of the thermal fleet by leveraging the results of WWSIS Phase 1 study.

Jordan, G.; Venkataraman, S.

2012-06-01T23:59:59.000Z

53

ELECTRIC  

Office of Legacy Management (LM)

you nay give us will be greatly uppreckted. VPry truly your23, 9. IX. Sin0j3, Mtinager lclectronics and Nuclear Physics Dept. omh , WESTINGHOUSE-THE NAT KING IN ELECTRICITY...

54

Memorandum of Understanding Regarding Coordination in Federal...  

Office of Environmental Management (EM)

Memorandum of Understanding Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, 2009 Memorandum of Understanding...

55

Western Area Power Administration Transmission Infrastructure...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Expected to Borrow Next WHAT IS WESTERN? * Power Marketing Administration under DOE * Wholesale electricity supplier, 57 hydropower plants, 10,479 MW capacity * 682 long-termfirm...

56

Development of a Hydrogasification Process for Co-Production of Substitute Natural Gas (SNG) and Electric Power from Western Coals-Phase I  

SciTech Connect (OSTI)

The Advanced Hydrogasification Process (AHP)--conversion of coal to methane--is being developed through NETL with a DOE Grant and has successfully completed its first phase of development. The results so far are encouraging and have led to commitment by DOE/NETL to begin a second phase--bench scale reactor vessel testing, expanded engineering analysis and economic perspective review. During the next decade new means of generating electricity, and other forms of energy, will be introduced. The members of the AHP Team envision a need for expanded sources of natural gas or substitutes for natural gas, to fuel power generating plants. The initial work the team has completed on a process to use hydrogen to convert coal to methane (pipeline ready gas) shows promising potential. The Team has intentionally slanted its efforts toward the needs of US electric utilities, particularly on fuels that can be used near urban centers where the greatest need for new electric generation is found. The process, as it has evolved, would produce methane from coal by adding hydrogen. The process appears to be efficient using western coals for conversion to a highly sought after fuel with significantly reduced CO{sub 2} emissions. Utilities have a natural interest in the preservation of their industry, which will require a dramatic reduction in stack emissions and an increase in sustainable technologies. Utilities tend to rank long-term stable supplies of fuel higher than most industries and are willing to trade some ratio of cost for stability. The need for sustainability, stability and environmentally compatible production are key drivers in the formation and progression of the AHP development. In Phase II, the team will add a focus on water conservation to determine how the basic gasification process can be best integrated with all the plant components to minimize water consumption during SNG production. The process allows for several CO{sub 2} reduction options including consumption of the CO{sub 2} in the original process as converted to methane. The process could under another option avoid emissions following the conversion to SNG through an adjunct algae conversion process. The algae would then be converted to fuels or other products. An additional application of the algae process at the end use natural gas fired plant could further reduce emissions. The APS team fully recognizes the competition facing the process from natural gas and imported liquid natural gas. While we expect those resources to set the price for methane in the near-term, the team's work to date indicates that the AHP process can be commercially competitive, with the added benefit of assuring long-term energy supplies from North American resources. Conversion of coal to a more readily transportable fuel that can be employed near load centers with an overall reduction of greenhouses gases is edging closer to reality.

Raymond Hobbs

2007-05-31T23:59:59.000Z

57

An Examination of Temporal Trends in Electricity Reliability Based on Reports from U.S. Electric Utilities  

E-Print Network [OSTI]

SAIDI SAIFI SERC SPP TRE WECC Alaska Systems CoordinatingElectricity Coordinating Council (WECC) Midwest ReliabilityCoordinating Council (WECC). Completeness of reported

Eto, Joseph H.

2013-01-01T23:59:59.000Z

58

Operating Reserve Implication of Alternative Implementations of an Energy Imbalance Service on Wind Integration in the Western Interconnection: Preprint  

SciTech Connect (OSTI)

During the past few years, there has been significant interest in alternative ways to manage power systems over a larger effective electrical footprint. Large regional transmission organizations in the Eastern Interconnection have effectively consolidated balancing areas, achieving significant economies of scale that result in a reduction in required reserves. Conversely, in the Western Interconnection there are many balancing areas, which will result in challenges if there is significant wind and solar energy development in the region. A recent proposal to the Western Electricity Coordinating Council suggests a regional energy imbalance service (EIS). To evaluate this EIS, a number of analyses are in process or are planned. This paper describes one part of an analysis of the EIS's implication on operating reserves under several alternative scenarios of the market footprint and participation. We improve on the operating reserves method utilized in the Eastern Wind Integration and Transmission Study and apply this modified approach to data from the Western Wind and Solar Integration Study.

Milligan, M.; Kirby, B.; King, J.; Beuning, S.

2011-07-01T23:59:59.000Z

59

How Western Does Business: An Explanation of Western's Products and Services  

SciTech Connect (OSTI)

The mission of the Western Area Power Administration is to market and deliver reliable, renewable, cost-based hydroelectric power and related services. This guide provides an overview of Western’s history and how Western carries out that mission and provides electrical, transmission and ancillary services. It also discusses how we develop plans for marketing our most valuable resources—long-term firm capacity and energy.

none,

2012-10-01T23:59:59.000Z

60

Power systems simulations of the western United States region.  

SciTech Connect (OSTI)

This report documents a part of a broad assessment of energy-water-related issues in the western United States. The full analysis involved three Department of Energy national laboratories: Argonne National Laboratory, Los Alamos National Laboratory, and Sandia National Laboratories. Argonne's objective in the overall project was to develop a regional power sector expansion forecast and a detailed unit-level operational (dispatch) analysis. With these two major analysis components, Argonne estimated current and future freshwater withdrawals and consumption related to the operation of U.S. thermal-electric power plants in the Western Electricity Coordinating Council (WECC) region for the period 2005-2025. Water is withdrawn and used primarily for cooling but also for environmental control, such as sulfur scrubbers. The current scope of the analysis included three scenarios: (1) Baseline scenario as a benchmark for assessing the adequacy and cost-effectiveness of water conservation options and strategies, (2) High nuclear scenario, and (3) High renewables scenario. Baseline projections are consistent with forecasts made by the WECC and the Energy Information Administration (EIA) in its Annual Energy Outlook (AEO) (EIA 2006a). Water conservation scenarios are currently limited to two development alternatives that focus heavily on constructing new generating facilities with zero water consumption. These technologies include wind farms and nuclear power plants with dry cooling. Additional water conservation scenarios and estimates of water use associated with fuel or resource extraction and processing will be developed in follow-on analyses.

Conzelmann, G.; Koritarov, V.; Poch, L.; Thimmapuram, P.; Veselka, T.; Decision and Information Sciences

2010-03-15T23:59:59.000Z

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Class 1 overview of cultural resources for the Western Area Power Administration Salt Lake City Area Integrated Projects electric power marketing environmental impact statement  

SciTech Connect (OSTI)

Argonne National Laboratory conducted an inventory of known archaeological and historic sites in areas that could be affected by the hydropower operation alternatives under analysis in the power marketing environmental impact statement for the Western Area Power Administration`s Salt Lake City Area Integrated Projects. The study areas included portions of the Green River (Flaming Gorge Dam to Cub Creek) in Utah and Colorado and the Gunnison River (Blue Mesa Reservoir to Crystal Dam) in Colorado. All previous archaeological surveys and previously recorded prehistoric and historic sites, structures, and features were inventoried and plotted on maps (only survey area maps are included in this report). The surveys were classified by their level of intensity, and the sites were classified according to their age, type, and contents. These data (presented here in tabular form) permit a general assessment of the character and distribution of archaeological remains in the study areas, as well as an indication of the sampling basis for such an assessment. To provide an adequate context for the descriptions of the archaeological and historic sites, this report also presents overviews of the environmental setting and the regional prehistory, history, and ethnography for each study area.

Moeller, K.L.; Malinowski, L.M.; Hoffecker, J.F.; Walitschek, D.A.; Shogren, L.; Mathews, J.E.; Verhaaren, B.T.

1993-11-01T23:59:59.000Z

62

Career Map: Instrumentation Coordinator  

Broader source: Energy.gov [DOE]

The Wind Program's Career Map provides job description information for Instrumentation Coordinator positions.

63

Secretary Moniz to Discuss Western Energy Landscape at Western...  

Energy Savers [EERE]

Discuss Western Energy Landscape at Western Governors' Association Annual Meeting Secretary Moniz to Discuss Western Energy Landscape at Western Governors' Association Annual...

64

Regional Summary Western Pacific Management Context  

E-Print Network [OSTI]

.5 million pounds) of the Pacific-wide (western-central and eastern Pacific Ocean) total of Pacific bigeye Ocean and the Inter-American Tropical Tuna Commission (IATTC) is active in the eastern Pacific Ocean coordinated management between countries with fishing interests in the Pacific Ocean. The annual bigeye tuna

65

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation library summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. It was presented to the 2012 Western Conference of Public Service Commissioners, during their June, 2012, meeting. The Western Conference of Public Service Commissioners is a regional association within the National Association of Regulatory Utility Commissioners (NARUC).

Hand, M. M.

2012-08-01T23:59:59.000Z

66

Electric System Decision Making in Other Regions: A Preliminary...  

Broader source: Energy.gov (indexed) [DOE]

Analysis Prepared for Western Interstate Energy Board Committee on Regional Electric Power Cooperation Electric System Decision Making in Other Regions: A Preliminary...

67

Effects of Temporal Wind Patterns on the Value of Wind-Generated Electricity in California and the Northwest  

E-Print Network [OSTI]

Laboratory, private communi- cation, March 12, 2004. WECC, "WECC 2006 Power Supply Assessment," Western Electricity

Wiser, Ryan H

2008-01-01T23:59:59.000Z

68

Coordination of Federal Authorizations for Electric Transmission  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate EarthEnergyDistrict EnergyCensus, Survey,|Facilities:

69

Hand Eye Coordination  

E-Print Network [OSTI]

This paper describes a simple method of converting visual coordinates to arm coordinates which does not require knowledge of the position of the camera(s). Comparisons are made to other methods and two camera, three ...

Speckert, Glen

70

AREA COORDINATOR RESIDENTIAL EDUCATION  

E-Print Network [OSTI]

AREA COORDINATOR RESIDENTIAL EDUCATION VANDERBILT UNIVERSITY, NASHVILLE, TENNESSEE The Office of Housing and Residential Education at Vanderbilt University is seeking applicants for an Area Coordinator. The Area Coordinator is responsible for assisting in the management and operation of a residential area

Bordenstein, Seth

71

Western Region Renewable Energy Markets: Implications for the Bureau of Land Management  

SciTech Connect (OSTI)

The purpose of this analysis is to provide the U.S. Department of the Interior (DOI) and the Bureau of Land Management (BLM) with an overview of renewable energy (RE) generation markets, transmission planning efforts, and the ongoing role of the BLM RE projects in the electricity markets of the 11 states (Arizona, California, Colorado, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, and Wyoming) that comprise the Western Electricity Coordinating Council (WECC) Region. This analysis focuses on the status of, and projections for, likely development of non-hydroelectric renewable electricity from solar (including photovoltaic [PV] and concentrating solar power [CSP]), wind, biomass and geothermal resources in these states. Absent new policy drivers and without the extension of the DOE loan guarantee program and Treasury's 1603 program, state RPS requirements are likely to remain a primary driver for new RE deployment in the western United States. Assuming no additional policy incentives are implemented, projected RE demand for the WECC states by 2020 is 134,000 GWh. Installed capacity to meet that demand will need to be within the range of 28,000-46,000 MW.

Haase, S.; Billman, L.; Gelman, R.

2012-01-01T23:59:59.000Z

72

RTG resource book for western states and provinces: Final proceedings  

SciTech Connect (OSTI)

The Western Interstate Energy Board held a workshop and liaison activities among western states, provinces, and utilities on the formation of Regional Transmission Groups (RTGs). Purpose of the activities was to examine the policy implications for western states and provinces in the formation of RTGs in the West, the implications for western ratepayers and utilities of the RTG formation and potential impacts of RTGs on the western electricity system. The workshop contributed to fulfilling the transmission access and competition objectives of Title VII of the Energy Policy Act of 1992.

NONE

1994-12-31T23:59:59.000Z

73

Western Pacific Regional Summary Western Pacific  

E-Print Network [OSTI]

) of the Pacific-wide (western-central and eastern Pacific Ocean) total of Pacific bigeye tuna landings reported Fisheries Commission (WCPFC) is active in the western and central Pacific Ocean and the Inter-American Tropical Tuna Commission (IATTC) is active in the eastern Pacific Ocean. Species under the purview

74

Coordinators Help Site  

E-Print Network [OSTI]

Everything is done electronically using e-mail notification and simple web-based tools. As a Coordinator your principal activity will be to screen eprints submitted ...

75

EIS-0386: Designation of Energy Corridors on Federal Land in Western States  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's decision to designatate corridors on Federal land in the eleven Western States for oil, gas and hydrogen pipelines and electricity transmission and distribution facilities.

76

The Western Wind and Solar Integration Study: The Effects of...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wind and Solar Power- Induced Cycling on Wear-and-Tear Costs and Emissions Results From the Western Wind and Solar Integration Study Phase 2 The electric grid is a highly complex,...

77

Regional Transportation Coordination Study  

E-Print Network [OSTI]

Regional Planning Commission Wanda Carter-Dyer Public Transportation Coordinator Texas Department of Transportation Councilperson Debra Martinez Briseno Cities in Calhoun County Laura G. Sanders Executive Director Golden Crescent Workforce... Regional Planning Commission Wanda Carter-Dyer Public Transportation Coordinator Texas Department of Transportation Councilperson Debra Martinez Briseno Cities in Calhoun County Laura G. Sanders Executive Director Golden Crescent Workforce...

Golden Crescent Regional Planning Commission

78

PROJECT REPORT WESTERN COOLING CHALLENGE LABORATORY  

E-Print Network [OSTI]

that reduce energy, water consumption and peak electricity demand associated with cooling in the Western-cool- er to reduce the refrigerant condensing temperature of a vapor compression system, then cycles Davis Energy Efficiency Center in 2007 through a grant from the California Clean Energy Fund

California at Davis, University of

79

UC Davis Western Cooling Challenge Program Requirements  

E-Print Network [OSTI]

demonstrate the capacity to produce 500 units per year, and the equipment tested must be commercially-appropriate rooftop packaged air conditioning equipment that will reduce electrical demand and energy use in Western of such technologies in the market place. Their interest in the Challenge is motivated by state and corporate goals

California at Davis, University of

80

Evaluation of Production Cost Savings from Consolidation of Balancing Authorities in the US Western Interconnection under High Wind and Solar Penetration  

SciTech Connect (OSTI)

This paper introduces a comprehensive analysis to quantify the potential savings in production cost due to consolidation of 32 US western interconnection Balancing Authorities (BAs). Three simulation scenarios are developed: current Western Electricity Coordinating Council (WECC) BAs structure, full copper-sheet consolidation, and full consolidation with transmission congestion considered. The study uses WECC Transmission Expansion Planning Policy Committee (TEPPC) model that was developed for the year 2020. The model assumes 8% wind and 3% solar energy penetration as percentage of total WECC demand in 2020. Sensitivity analyses are carried out to assess the impact of transmission hurdle rates between WECC BAs on potential benefits. The study shows savings that ranges from $400 Million (2.4% of total one year production cost) to $600 Million (3.2%) per year in thermal units production cost due to consolidation can be achieved. The copper sheet consolidation scenario shows an extra savings of $240 Million (1.4%) per year.

Nguyen, Tony B.; Samaan, Nader A.; Jin, Chunlian

2014-12-24T23:59:59.000Z

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Final Report on Transmission Pricing in the Western Interconnection  

SciTech Connect (OSTI)

Under this project, the Committee on Regional Electric Power Cooperation (CREPC) of the Western Interstate Energy Board developed a ''western pricing and congestion management proposal'' in order to foster efficient wholesale power markets and efficient use and expansion of the transmission grid. Drafts of this paper provided useful information to states/provinces in the Western Interconnection as Western Regional Transmission Organization (RTO) transmission pricing proposals have continued to evolve. Throughout the project there has been a gradual, but incomplete agreement on pricing systems to be used by RTOs in the West.

Douglas C. Larson; Lawrence Nordell

2003-06-25T23:59:59.000Z

82

CEMI Western Regional Summit  

Broader source: Energy.gov [DOE]

Please Join Assistant Secretary of Energy Dr. David Danielson for the Clean Energy Manufacturing Initiative's Western Regional Summit. Register now for this free event.

83

Assessing Vehicle Electricity Demand Impacts on California Electricity Supply  

E-Print Network [OSTI]

System Operator. WECC (2006) Information Summary, Westernx SDG&E SMR SMUD TID v VMT WECC San Diego Gas & ElectricCoordinating Council (WECC) differ somewhat from the CEC and

McCarthy, Ryan W.

2009-01-01T23:59:59.000Z

84

Western Pacific Regional Summary Western Pacific  

E-Print Network [OSTI]

-central and eastern Pacific Ocean) total of Pacific bigeye tuna landings reported in 2007. Currently (WCPFC) is active in the western and central Pacific Ocean and the Inter-American Tropical Tuna Commission (IATTC) is active in the eastern Pacific Ocean. Species under the purview of the WCPFC and IATTC

85

Western Pacific Regional Summary Western Pacific  

E-Print Network [OSTI]

Pacific Ocean) total of Pacific bigeye tuna landings reported in 2007. Currently, there are no catch share in the western and central Pacific Ocean and the Inter-American Tropical Tuna Commission (IATTC) is active in the eastern Pacific Ocean. Species under the purview of the WCPFC and IATTC migrate across international

86

Midterm Picnic New CIP Coordinator  

E-Print Network [OSTI]

Highlights Midterm Picnic New CIP Coordinator Birthdays Manners TheELIWeekly Midterm Picnic and say goodbye! New CIP Coordinator The ELI is conducting a nation-wide search for a new CIP Coordinator. Fortunately, Nate Bloemke has agreed to be the Interim CIP Coordinator until our search is over. Thank you

Pilyugin, Sergei S.

87

Block coordination copolymers  

DOE Patents [OSTI]

The present invention provides compositions of crystalline coordination copolymers wherein multiple organic molecules are assembled to produce porous framework materials with layered or core-shell structures. These materials are synthesized by sequential growth techniques such as the seed growth technique. In addition, the invention provides a simple procedure for controlling functionality.

Koh, Kyoung Moo; Wong-Foy, Antek G; Matzger, Adam J; Benin, Annabelle I; Willis, Richard R

2014-11-11T23:59:59.000Z

88

Block coordination copolymers  

DOE Patents [OSTI]

The present invention provides compositions of crystalline coordination copolymers wherein multiple organic molecules are assembled to produce porous framework materials with layered or core-shell structures. These materials are synthesized by sequential growth techniques such as the seed growth technique. In addition, the invention provides a simple procedure for controlling functionality.

Koh, Kyoung Moo; Wong-Foy, Antek G.; Matzger, Adam J.; Benin, Annabelle I.; Willis, Richard R.

2012-12-04T23:59:59.000Z

89

Environmental Compliance Issue Coordination  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish the Department of Energy (DOE) requirements for coordination of significant environmental compliance issues to ensure timely development and consistent application of Departmental environmental policy and guidance. Cancels DOE O 5400.2. Para. 5a(2) and 5a(7) canceled by DOE O 231.1.

1993-01-07T23:59:59.000Z

90

Block coordination copolymers  

DOE Patents [OSTI]

The present invention provides compositions of crystalline coordination copolymers wherein multiple organic molecules are assembled to produce porous framework materials with layered or core-shell structures. These materials are synthesized by sequential growth techniques such as the seed growth technique. In addition, the invention provides a simple procedure for controlling functionality.

Koh, Kyoung Moo; Wong-Foy, Antek G; Matzger, Adam J; Benin, Annabelle I; Willis, Richard R

2012-11-13T23:59:59.000Z

91

Coordinating and promoting effective  

E-Print Network [OSTI]

1 I Coordinating and promoting effective protection and restoration of fish, wildlife Nation Idaho Department of Fish and Game Kootenai Tribe of Idaho Montana Department of Fish, Wildlife and Parks National Marine Fisheries Service Nez Perce Tribe Oregon Department of Fish and Wildlife Shoshone

92

Arnold Schwarzenegger INTERMITTENCY ANALYSIS PROJECT  

E-Print Network [OSTI]

the Tehachapi, Imperial, Western Electricity Coordinating Council (WECC) and Frontier Line working groups

93

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

................................................................. 1 1.0 Western Electricity Coordinating Council (WECC) WAMS (Wide Area Measurement System

94

Electric Load Forecasting  

E-Print Network [OSTI]

-commitment, coordination, and interchange evaluation. In addition, the liberalization of electric energy markets worldwide has led to the development of energy exchanges where consumers, 1066-033X/07/$25.00©2007IEEE OCTOBER/GODDARD SPACE FLIGHT CENTER SCIENTIFIC VISUALIZATION STUDIO Authorized licensed use limited to: Katholieke

95

AFTER A Framework for electrical power sysTems vulnerability...  

Open Energy Info (EERE)

Germany) Jump to: navigation, search Project Name AFTER A Framework for electrical power sysTems vulnerability identification, dEfense and Restoration Country Germany Coordinates...

96

AFTER A Framework for electrical power sysTems vulnerability...  

Open Energy Info (EERE)

Norway) Jump to: navigation, search Project Name AFTER A Framework for electrical power sysTems vulnerability identification, dEfense and Restoration Country Norway Coordinates...

97

Electricity demand as frequency controlled reserves, ENS (Smart...  

Open Energy Info (EERE)

ENS (Smart Grid Project) Jump to: navigation, search Project Name Electricity demand as frequency controlled reserves, ENS Country Denmark Coordinates 56.26392, 9.501785...

98

Electricity demand as frequency controlled reserves, ForskEL...  

Open Energy Info (EERE)

ForskEL (Smart Grid Project) Jump to: navigation, search Project Name Electricity demand as frequency controlled reserves, ForskEL Country Denmark Coordinates 56.26392,...

99

Proposed changes to generating capacity 1980-1989 for the contiguous United States: as projected by the Regional Electric Reliability Councils in their April 1, 1980 long-range coordinated planning reports to the Department of Energy  

SciTech Connect (OSTI)

The changes in generating capacity projected for 1980 to 1989 are summarized. Tabulated data provide summaries to the information on projected generating unit construction, retirements, and changes, in several different categories and groupings. The new generating units to be completed by the end of 1989 total 699, representing 259,490 megawatts. This total includes 10 wind power and one fuel cell installations totaling 48.5 MW to be completed by the end of 1989. There are 321 units totaling 13,222 MW to be retired. There are capacity changes due to upratings and deratings. Summary data are presented for: total requirement for electric energy generation for 1985; hydroelectric energy production for 1985; nuclear energy production for 1985; geothermal and other energy production for 1985; approximate non-fossil generation for 1985; range of fossil energy requirements for 1985; actual fossil energy sources 1974 to 1979; estimated range of fossil fuel requirements for 1985; coal capacity available in 1985; and computation of fuel use in 1985. Power plant capacity factors are presented. Extensive data on proposed generating capacity changes by individual units in the 9 Regional Electric Reliability Councils are presented.

None

1980-12-01T23:59:59.000Z

100

EE 3410 Electric Power Instructor: Ernest Mendrela  

E-Print Network [OSTI]

, it is generators and motors. We will discuss these various electric machines starting with our very first machines - complex motion - described by two or three space co-ordinates, which is generated in electric1 EE ­ 3410 Electric Power Fall 2003 Instructor: Ernest Mendrela Electromechanical Energy

Koppelman, David M.

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Benefit of Regional Energy Balancing Service on Wind Integration in the Western Interconnection of the United States  

SciTech Connect (OSTI)

Interest in various wide-area balancing schemes to help integrate wind have generated significant interest. As we have shown in past work, large balancing areas not only help with wind integration, but can also increase the efficiency of operations in systems without wind. Recent work on the Western Wind and Solar Integration Study (WWSIS) has found that combining balancing over the WestConnect footprint will increase the efficiency of commitment and dispatch at wind penetrations ranging from 10-20% of annual electricity demand, and will be essential for high penetrations and small balancing areas. In addition the Northwest Wind Integration Action Plan recommended balancing area cooperation as a method to help integrate the large potential wind development. In this paper we investigate the potential impact of a proposed Energy Imbalance Service on the ability of the non-market portions of Western Electricity Coordinating Councils (WECC) United States footprint to integrate wind energy. We will utilize data adapted from the WWSIS for the Western Interconnection. The analysis uses time-synchronized wind and load data to evaluate the potential for ramp requirement reduction that could be achieved with combined operation. Chronological analysis and ramp duration analysis quantify the benefit in terms of not only the ramp sizes, but the frequency of the potentially avoided ramps that must be managed by the non-wind generation fleet. Multiple approaches that can be used to achieve these benefits will also be suggested in the paper. We also suggest other approaches that can help achieve much of the benefit of full consolidation without requiring the physical consolidation of balancing areas.

Milligan, M.; Kirby, B.; King, J.; Beuning, S.

2010-01-01T23:59:59.000Z

102

Designing pricing strategies for coordination of networked distributed energy resources  

E-Print Network [OSTI]

Designing pricing strategies for coordination of networked distributed energy resources Bahman, by a group of distributed energy resources (DERs). The aggregator interacts with the wholesale electricity. The objective is for the aggregator to design a pricing strategy for incentivizing DERs to modify their active

Liberzon, Daniel

103

Program Sustainability: Coordinating Energy Efficiency with Water...  

Broader source: Energy.gov (indexed) [DOE]

Program Sustainability: Coordinating Energy Efficiency with Water Conservation Services Peer Exchange Call Program Sustainability: Coordinating Energy Efficiency with Water...

104

A uniform price auction with locational price adjustments for competitive electricity markets  

E-Print Network [OSTI]

; Competitive electricity markets; Poolco Alternatively, the Market Coordinator could ask the private generatingA uniform price auction with locational price adjustments for competitive electricity markets b School of Electrical Engineering, Phillips Hall, Cornell University, Ithaca, NY 14853, USA c

105

Coordinated Home Energy Management for Real-Time Power Balancing  

E-Print Network [OSTI]

This paper proposes a coordinated home energy management system (HEMS) architecture where the distributed residential units cooperate with each other to achieve real-time power balancing. The economic benefits for the retailer and incentives for the customers to participate in the proposed coordinated HEMS program are given. We formulate the coordinated HEMS design problem as a dynamic programming (DP) and use approximate DP approaches to efficiently handle the design problem. A distributed implementation algorithm based on the convex optimization based dual decomposition technique is also presented. Our focus in the current paper is on the deferrable appliances, such as Plug-in (Hybrid) Electric Vehicles (PHEV), in view of their higher impact on the grid stability. Simulation results shows that the proposed coordinated HEMS architecture can efficiently improve the real-time power balancing.

Chang, Tsung-Hui; Scaglione, Anna

2012-01-01T23:59:59.000Z

106

WESTERN MICHIGAN UNIVERSITY STUDENT CODE  

E-Print Network [OSTI]

WESTERN MICHIGAN UNIVERSITY STUDENT CODE Approved by The Western Michigan University Board Michigan University Kalamazoo, MI 49008 Effective August 2008 #12;A UNIVERSITY COMMUNITY IS... ...a for the Advancement of Teaching; Ernest L. Boyer (frwd.); Princeton, New Jersey; 1990 #12;WESTERN MICHIGAN UNIVERSITY

de Doncker, Elise

107

Accounts Receivable Western Michigan University  

E-Print Network [OSTI]

Accounts Receivable Western Michigan University 1903 W. Michigan Avenue Kalamazoo, MI 49008 have read the Western Michigan University Third Party Billing Policy and agree to the terms. I am authorizing Western Michigan University to bill for the specified tuition and related fees for the term

de Doncker, Elise

108

Accounts Receivable Western Michigan University  

E-Print Network [OSTI]

Accounts Receivable Western Michigan University 1903 W. Michigan Avenue Kalamazoo, MI 49008-5210 269 387-4251 Fax 269 387-4227 THIRD PARTY BILLING POLICY Western Michigan University (WMU# (269) 387-4227 Western Michigan University 1903 W. Michigan Avenue E-mail: wmu

de Doncker, Elise

109

MURDOCH UNIVERSITY PERTH, WESTERN AUSTRALIA  

E-Print Network [OSTI]

MURDOCH UNIVERSITY PERTH, WESTERN AUSTRALIA INAUGRATION CEREMONY 17TH SEPTEMBER, 1974 #12;ORDER Murdoch University, the second university to be established in Western Australia, and the eighteenth in Australia, was constituted 25 July 1973 by an Act of the Parliament of Western Australia. The initial

110

Transportation External Coordination Working Group:  

Broader source: Energy.gov (indexed) [DOE]

External Coordination Working Group: Background and Process Judith Holm National Transportation Program Albuquerque, New Mexico April 21, 2004 TEC History * DOE's Office of...

111

Optimization Online - Coordinate descent algorithms  

E-Print Network [OSTI]

Dec 1, 2014 ... Stephen Wright(swright ***at*** cs.wisc.edu). Abstract: Coordinate descent algorithms solve optimization problems by successively minimizing ...

Stephen Wright

2014-12-01T23:59:59.000Z

112

Assistance to States on Electric Industry Issues  

SciTech Connect (OSTI)

This project seeks to educate state policymakers through a coordinated approach involving state legislatures, regulators, energy officials, and governors’ staffs. NCSL’s activities in this project focus on educating state legislators. Major components of this proposal include technical assistance to state legislatures, briefing papers, coordination with the National Council on Electricity Policy, information assistance, coordination and outreach, meetings, and a set of transmission-related activities.

Glen Andersen

2010-10-25T23:59:59.000Z

113

Western Kentucky thrives  

SciTech Connect (OSTI)

Independents and big boys struggle to keep up with increasing demand and a lack of experienced workers in the Illinois Basin. This is the second of a two part series reviewing the coal mining industry in the Illinois Basin which also includes Indiana and Western Kentucky. It includes a classification/correction to Part 1 of the article published in the September 2005 issue (see Coal Abstracts Entry data/number Dec 2005 00204). 4 photos.

Buchsbaum, L.

2005-10-01T23:59:59.000Z

114

The Western Wind and Solar Integration Study Phase 2 (Fact Sheet...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Western Wind and Solar Integration Study Phase 2 An examination of how wind and solar power affect operations, costs, and emissions from fossil-fueled generators The electric...

115

Western Wind and Solar Integration Study: Hydropower Analysis  

SciTech Connect (OSTI)

The U.S. Department of Energy's (DOE) study of 20% Wind Energy by 2030 was conducted to consider the benefits, challenges, and costs associated with sourcing 20% of U.S. energy consumption from wind power by 2030. This study found that with proactive measures, no insurmountable barriers were identified to meet the 20% goal. Following this study, DOE and the National Renewable Energy Laboratory (NREL) conducted two more studies: the Eastern Wind Integration and Transmission Study (EWITS) covering the eastern portion of the U.S., and the Western Wind and Solar Integration Study (WWSIS) covering the western portion of the United States. The WWSIS was conducted by NREL and research partner General Electric (GE) in order to provide insight into the costs, technical or physical barriers, and operational impacts caused by the variability and uncertainty of wind, photovoltaic, and concentrated solar power when employed to serve up to 35% of the load energy in the WestConnect region (Arizona, Colorado, Nevada, New Mexico, and Wyoming). WestConnect is composed of several utility companies working collaboratively to assess stakeholder and market needs to and develop cost-effective improvements to the western wholesale electricity market. Participants include the Arizona Public Service, El Paso Electric Company, NV Energy, Public Service of New Mexico, Salt River Project, Tri-State Generation and Transmission Cooperative, Tucson Electric Power, Xcel Energy and the Western Area Power Administration.

Acker, T.; Pete, C.

2012-03-01T23:59:59.000Z

116

UCDavisWesternCoolingChallenge ProgramRequirements  

E-Print Network [OSTI]

demonstrate the capacity to produce 500 units per year, and the equipment tested must be commercially rooftop packaged air conditioning equipment that will reduce electrical demand and energy use in Western of such technologies in the market place. Their interest in the Challenge is motivated by state and corporate goals

California at Davis, University of

117

Case Western University (Vestas) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectricEnergyCTBarreis aCallahanWind Farm Jump to:Case Western University

118

Case Western University | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectricEnergyCTBarreis aCallahanWind Farm Jump to:Case Western UniversityCase

119

Financial Operations Coordinator Graduate School  

E-Print Network [OSTI]

with the Deans, Associate Deans, and Business officers in the colleges. Also coordinate awards; such as the Fulbright with the Provost's Office and International Programs. · Coordinate award programs, including Guest and manual entries for example: o Track purchasing transactions with appropriate documentation o P

Rutledge, Steven

120

GEAR Tech-21 Geographic Coordinates  

E-Print Network [OSTI]

and two others on the grid below: Important Terms #12;GEAR Tech-21 Geographic Coordinates How Far Are They on the grid below. You will need to label your grid. Using the data you collected, relate the points to one Coordinates Map Challenge Lincoln, Nebraska: Two cities with the same latitude: Two cities with the same

Farritor, Shane

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Coordination of Energy Efficiency and Demand Response  

SciTech Connect (OSTI)

This paper reviews the relationship between energy efficiency and demand response and discusses approaches and barriers to coordinating energy efficiency and demand response. The paper is intended to support the 10 implementation goals of the National Action Plan for Energy Efficiency's Vision to achieve all cost-effective energy efficiency by 2025. Improving energy efficiency in our homes, businesses, schools, governments, and industries - which consume more than 70 percent of the nation's natural gas and electricity - is one of the most constructive, cost-effective ways to address the challenges of high energy prices, energy security and independence, air pollution, and global climate change. While energy efficiency is an increasingly prominent component of efforts to supply affordable, reliable, secure, and clean electric power, demand response is becoming a valuable tool in utility and regional resource plans. The Federal Energy Regulatory Commission (FERC) estimated the contribution from existing U.S. demand response resources at about 41,000 megawatts (MW), about 5.8 percent of 2008 summer peak demand (FERC, 2008). Moreover, FERC recently estimated nationwide achievable demand response potential at 138,000 MW (14 percent of peak demand) by 2019 (FERC, 2009).2 A recent Electric Power Research Institute study estimates that 'the combination of demand response and energy efficiency programs has the potential to reduce non-coincident summer peak demand by 157 GW' by 2030, or 14-20 percent below projected levels (EPRI, 2009a). This paper supports the Action Plan's effort to coordinate energy efficiency and demand response programs to maximize value to customers. For information on the full suite of policy and programmatic options for removing barriers to energy efficiency, see the Vision for 2025 and the various other Action Plan papers and guides available at www.epa.gov/eeactionplan.

Goldman, Charles; Reid, Michael; Levy, Roger; Silverstein, Alison

2010-01-29T23:59:59.000Z

122

Western Area Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched FerromagnetismWaste and MaterialsWenjun Deng Associate ResearchWestern Area Power

123

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

Investments in the WECC. ” The Electricity Journal 22(9):Coordinating Council (WECC). In Section 3 we examine theannual energy demand in the WECC with new RE for a target

Mills, Andrew D

2011-01-01T23:59:59.000Z

124

Suspect Counterfeit Coordinators, February 2015  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

ETTPEM Susan Kimmerly PQA Manager 865-574-8242 LOW@bechteljacobs.org Tom Warnick SCI SME 865-241-9516 7TO@bechteljacobs.org Fossil Energy HQFE Connie Lorenz HQ SCI Coordinator...

125

Suspect Counterfeit Coordinators, April 2015  

Broader source: Energy.gov (indexed) [DOE]

ETTPEM Susan Kimmerly PQA Manager 865-574-8242 LOW@bechteljacobs.org Tom Warnick SCI SME 865-241-9516 7TO@bechteljacobs.org Fossil Energy HQFE Connie Lorenz HQ SCI Coordinator...

126

LLP/ERASMUS Institutional Coordinator  

E-Print Network [OSTI]

(BA/MA) Departmental Coordinator: Prof. Dr. Olga Pollatos olga.pollatos@uni-ulm.de Computer Science (481) Study Programs taught in German: Informatik (BA/MA) Medieninformatik (BA/MA) Software Engineering

Pfeifer, Holger

127

INTERNATIONAL SPACE EXPLORATION COORDINATION GROUP  

E-Print Network [OSTI]

space exploration infrastructure standards facilitating interoperability through an international with relevant existing international working groups/ organisations. · Preparation and Organization of a WS1 INTERNATIONAL SPACE EXPLORATION COORDINATION GROUP WORKPLAN Update following 3rd ISECG Meeting

128

Electrical Engineer  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration, Upper Great Plains Region, Maintenance, Engineering, (B5500), Huron, SD or...

129

Electrical Engineer  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration, Upper Great Plains Region, Maintenance, Engineering, (B5500) Huron, SD Find out...

130

Coordinating Interstate ElectricTransmission Siting: An Introduction...  

Broader source: Energy.gov (indexed) [DOE]

the near future. While improved demand-side management (including energy effi ciency and demand response), bett er utilization of the existing transmission grid, and other...

131

Electricity Policy Coordination and Implementation | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecember 2005DepartmentDecember 2011 EMAB Meeting -Committee Charter, August 9,

132

Coordinating Interstate ElectricTransmission Siting: An Introduction to the  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart GridThird Quarter OverallDepartmentSpaceDebate |

133

Coordinated Multilateral Trades for Electric Power Networks: Theory and Implementation  

E-Print Network [OSTI]

on Workable Energy Regulation (POWER). POWER is a program of the University of California Energy Institute of California Energy Institute 2539 Channing Way Berkeley, California 94720-5180 www.ucei.berkeley.edu/ucei #12 assumption of the feasible set for nonlinear flows, Lemma 2 will be valid. Using the modified definition

California at Berkeley. University of

134

AVTA: 2010 Electric Vehicles International Neighborhood Electric...  

Energy Savers [EERE]

10 Electric Vehicles International Neighborhood Electric Vehicle Testing Results AVTA: 2010 Electric Vehicles International Neighborhood Electric Vehicle Testing Results The...

135

CLEERS Coordination & Development of Catalyst Process Kinetic...  

Broader source: Energy.gov (indexed) [DOE]

& coordinate DOE research efforts (CLEERS Coordination) * Develop detailed technical data required to simulate energy efficient emission controls (LNT & SCR Kinetics, Sulfur &...

136

Coordination of Energy Efficiency and Demand Response  

E-Print Network [OSTI]

California Long-term Energy Efficiency Strategic Plan. B-2 Coordination of Energy Efficiency and Demand Response> B-4 Coordination of Energy Efficiency and Demand Response

Goldman, Charles

2010-01-01T23:59:59.000Z

137

CLEERS Coordination & Development of Catalyst Process Kinetic...  

Energy Savers [EERE]

CLEERS Coordination & Development of Catalyst Process Kinetic Data - Pres. 1: Coordination of CLEERS Project; Pres. 2: ORNL Research on LNT Sulfation & Desulfation CLEERS...

138

Electricity Reliability  

E-Print Network [OSTI]

Electricity Delivery and Energy Reliability High Temperature Superconductivity (HTS) Visualization in the future because they have virtually no resistance to electric current, offering the possibility of new electric power equipment with more energy efficiency and higher capacity than today's systems

139

DOE: Quantifying the Value of Hydropower in the Electric Grid  

SciTech Connect (OSTI)

The report summarizes research to Quantify the Value of Hydropower in the Electric Grid. This 3-year DOE study focused on defining value of hydropower assets in a changing electric grid. Methods are described for valuation and planning of pumped storage and conventional hydropower. The project team conducted plant case studies, electric system modeling, market analysis, cost data gathering, and evaluations of operating strategies and constraints. Five other reports detailing these research results are available a project website, www.epri.com/hydrogrid. With increasing deployment of wind and solar renewable generation, many owners, operators, and developers of hydropower have recognized the opportunity to provide more flexibility and ancillary services to the electric grid. To quantify value of services, this study focused on the Western Electric Coordinating Council region. A security-constrained, unit commitment and economic dispatch model was used to quantify the role of hydropower for several future energy scenarios up to 2020. This hourly production simulation considered transmission requirements to deliver energy, including future expansion plans. Both energy and ancillary service values were considered. Addressing specifically the quantification of pumped storage value, no single value stream dominated predicted plant contributions in various energy futures. Modeling confirmed that service value depends greatly on location and on competition with other available grid support resources. In this summary, ten different value streams related to hydropower are described. These fell into three categories; operational improvements, new technologies, and electricity market opportunities. Of these ten, the study was able to quantify a monetary value in six by applying both present day and future scenarios for operating the electric grid. This study confirmed that hydropower resources across the United States contribute significantly to operation of the grid in terms of energy, capacity, and ancillary services. Many potential improvements to existing hydropower plants were found to be cost-effective. Pumped storage is the most likely form of large new hydro asset expansions in the U.S. however, justifying investments in new pumped storage plants remains very challenging with current electricity market economics. Even over a wide range of possible energy futures, up to 2020, no energy future was found to bring quantifiable revenues sufficient to cover estimated costs of plant construction. Value streams not quantified in this study may provide a different cost-benefit balance and an economic tipping point for hydro. Future studies are essential in the quest to quantify the full potential value. Additional research should consider the value of services provided by advanced storage hydropower and pumped storage at smaller time steps for integration of variable renewable resources, and should include all possible value streams such as capacity value and portfolio benefits i.e.; reducing cycling on traditional generation.

None

2012-12-31T23:59:59.000Z

140

2014 State of Western's Assets  

SciTech Connect (OSTI)

In this report we document the State of Western’s Assets in terms of physical equipment, financial resources, strategic direction, and human capital, both at the organizational and regional levels. We identify the condition of our assets today and share what work we will be doing in these areas in the coming years.

none,

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Approaches To Integrating A HIgh Penertration Of Solar PV and CPV Onto The Electrical Grid  

E-Print Network [OSTI]

Electric Coordinating Council (WECC), the National RenewableSubstations Recommendations For WECC Transmission Expansioncoordinated with the CAISO and WECC. OTHER The target budget

Hill, Steven Craig

2013-01-01T23:59:59.000Z

142

Western Wind and Solar Integration Study (Fact Sheet)  

SciTech Connect (OSTI)

Initiated in 2007 to examine the operational impact of up to 35% penetration of wind, photovoltaic (PV), and concentrating solar power (CSP) energy on the electric power system, the Western Wind and Solar Integration Study (WWSIS) is one of the largest regional wind and solar integration studies to date. The goal is to understand the effects of variability and uncertainty of wind, PV, and CSP on the grid. In the Western Wind and Solar Integration Study Phase 1, solar penetration was limited to 5%. Utility-scale PV was not included because of limited capability to model sub-hourly, utility-scale PV output . New techniques allow the Western Wind and Solar Integration Study Phase 2 to include high penetrations of solar - not only CSP and rooftop PV but also utility-scale PV plants.

Not Available

2012-09-01T23:59:59.000Z

144

Agency Energy Coordinators for Award Nominations  

Broader source: Energy.gov [DOE]

Federal agency energy coordinators handle all nominations for the Federal Energy and Water Management Awards.

145

ECE 3301: General Electrical Engineering Credit / Contact hours: 3 / 3  

E-Print Network [OSTI]

ECE 3301: General Electrical Engineering Credit / Contact hours: 3 / 3 Course coordinator: Mary Baker Textbook(s) and/or other required material: Hambley, Allan R., Electrical Engineering ­ Principles and Applications, fourth edition, Prentice Hall, 2007. Catalog description: Analysis of electric circuits

Gelfond, Michael

146

Western Energy Corridor -- Energy Resource Report  

SciTech Connect (OSTI)

The world is facing significant growth in energy demand over the next several decades. Strategic in meeting this demand are the world-class energy resources concentrated along the Rocky Mountains and northern plains in Canada and the U.S., informally referred to as the Western Energy Corridor (WEC). The fossil energy resources in this region are rivaled only in a very few places in the world, and the proven uranium reserves are among the world's largest. Also concentrated in this region are renewable resources contributing to wind power, hydro power, bioenergy, geothermal energy, and solar energy. Substantial existing and planned energy infrastructure, including refineries, pipelines, electrical transmission lines, and rail lines provide access to these resources.

Leslie Roberts; Michael Hagood

2011-06-01T23:59:59.000Z

147

LAGRANGIAN COORDINATES AND MULTICLASS MODELS  

E-Print Network [OSTI]

LAGRANGIAN COORDINATES AND MULTICLASS MODELS The kinematic wave model, also known as the Lighthill. introduced a kinematic wave model with multiple user classes (7). They show qualitatively Formulation of Multiclass Kinematic Wave Model Femke van Wageningen-Kessels, Hans van Lint, Serge P

Vuik, Kees

148

Work as coordination and coordination as work: A process perspective on FLOSS development projects  

E-Print Network [OSTI]

and coordination as work: A process perspective on FLOSS development projects Abstract Coordination in work teamsWork as coordination and coordination as work: A process perspective on FLOSS development projects Dipartimento Impresa e Lavoro UniversitĂ  degli Studi di Cassino Cassino Italy #12;Work as coordination

Crowston, Kevin

149

Charging and Storage Infrastructure Design for Electric Vehicles MARJAN MOMTAZPOUR and PATRICK BUTLER, Virginia Tech  

E-Print Network [OSTI]

A Charging and Storage Infrastructure Design for Electric Vehicles MARJAN MOMTAZPOUR and PATRICK charging and storage infrastructure design for electric vehicles. We develop coordinated clustering. 2012. Charging and Storage Infrastructure Design for EVs. ACM Trans. Intell. Syst. Technol. V, N

Ramakrishnan, Naren

150

10 Year Transmission Plan for the Western Electricity Interconnection  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment( Sample of Shipment Notice)1021 --MaterialsReleased | Department of

151

Central Electric Coop. Oregon Trail Electric Coop. Douglas Electric  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Central Electric Coop. Oregon Trail Electric Coop. Douglas Electric Coop. Blachly- Lane Co. Coop Umatilla Electric Coop. Hermiston Milton- Freewater Idaho Co Light & Power Coop....

152

RECIPROCAL BORROWING Western Australian University Libraries  

E-Print Network [OSTI]

, The University of Western Australia and University of Notre Dame Australia. Western Australian University to 30 items on loan at any one time from The University of Western Australia, and up to 12 items fromRECIPROCAL BORROWING Western Australian University Libraries This guide explains the reciprocal

153

Western Wind and Solar Integration Study  

SciTech Connect (OSTI)

The Western Wind and Solar Integration Study (WWSIS) is one of the largest regional wind and solar integration studies to date. It was initiated in 2007 to examine the operational impact of up to 35% energy penetration of wind, photovoltaics (PV), and concentrating solar power (CSP) on the power system operated by the WestConnect group of utilities in Arizona, Colorado, Nevada, New Mexico, and Wyoming (see study area map). WestConnect also includes utilities in California, but these were not included because California had already completed a renewable energy integration study for the state. This study was set up to answer questions that utilities, public utilities commissions, developers, and regional planning organizations had about renewable energy use in the west: (1) Does geographic diversity of renewable energy resource help mitigate variability; (2) How do local resources compare to out-of-state resources; (3) Can balancing area cooperation help mitigate variability; (4) What is the role and value of energy storage; (5) Should reserve requirements be modified; (6) What is the benefit of forecasting; and (7) How can hydropower help with integration of renewables? The Western Wind and Solar Integration Study is sponsored by the U.S. Department of Energy (DOE) and run by NREL with WestConnect as a partner organization. The study follows DOE's 20% Wind Energy by 2030 report, which did not find any technical barriers to reaching 20% wind energy in the continental United States by 2030. This study and its partner study, the Eastern Wind Integration and Transmission Study, performed a more in-depth operating impact analysis to see if 20% wind energy was feasible from an operational level. In DOE/NREL's analysis, the 20% wind energy target required 25% wind energy in the western interconnection; therefore, this study considered 20% and 30% wind energy to bracket the DOE analysis. Additionally, since solar is rapidly growing in the west, 5% solar was also considered in this study. The goal of the Western Wind and Solar Integration Study is to understand the costs and operating impacts due to the variability and uncertainty of wind, PV, and CSP on the grid. This is mainly an operations study, (rather than a transmission study), although different scenarios model different transmission build-outs to deliver power. Using a detailed power system production simulation model, the study identifies operational impacts and challenges of wind energy penetration up to 30% of annual electricity consumption.

Lew, D.; Piwko, R.; Jordan, G.; Miller, N.; Clark, K.; Freeman, L.; Milligan, M.

2011-01-01T23:59:59.000Z

154

Electrical Engineer  

Broader source: Energy.gov [DOE]

This position is located in the Office of Electric Reliability. The Office of Electric Reliability helps protect and improve the reliability and security of the nation's bulk power system through...

155

Electrical + Engineering  

E-Print Network [OSTI]

(neuhoff@umich.edu) Associate Chair of Undergraduate Affairs: Jamie Phillips (jphilli@umich.edu) Associate Armstrong (lisaj@umich.edu) Program Coordinators Undergraduate Program: Catie Lenaway (lenaway@umich.edu) Ph

Eustice, Ryan

156

Geographic coordinates | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Power Basics (TheEtelligenceGainSpanRate-Making Jump to: navigation,coordinates

157

CVD facility electrical system captor/dapper study  

SciTech Connect (OSTI)

Project W-441, CVD Facility Electrical System CAPTOWDAPPER Study validates Meier's hand calculations. This study includes Load flow, short circuit, voltage drop, protective device coordination, and transient motor starting (TMS) analyses.

SINGH, G.

1999-10-28T23:59:59.000Z

158

Optimal State Electric Supply in Texas -- Overview and Progress  

E-Print Network [OSTI]

In 1988, the results of the PUCT Bulk Power Transmission Study indicated a range of potential cost savings which could result from greater coordination of power transfers among the utilities in Texas which comprise the Electric Reliability Council...

Moore, B.

159

ASTER Thermal Anomalies in western Colorado  

SciTech Connect (OSTI)

Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Publication Date: 2012 Title: ASTER Thermal Anomalies Western Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science (CIRES), University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains the areas identified as areas of anomalous surface temperature from ASTER satellite imagery. The temperature is calculated using the Emissivity Normalization Algorithm that separate temperature from emissivity. Areas that had temperature greater than 2?, and areas with temperature equal to 1? to 2?, were considered ASTER modeled very warm and warm surface exposures (thermal anomalies), respectively Spatial Domain: Extent: Top: 4547052.446651 m Left: 158917.090117 m Right: 4101162.228281 m Bottom: 4101162.228281 m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System ’1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shape file

Zehner, Richard E.

2013-01-01T23:59:59.000Z

160

Coordination and sharing at the interfaces  

E-Print Network [OSTI]

This thesis examines properties of a type of coordinate structure that involves shared material (i.e., elements above the point coordination that c-command all of the conjuncts), what is referred to as a sharing structure. ...

Lin, Vivian I-Wen, 1972-

2002-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Electric vehicles  

SciTech Connect (OSTI)

Quiet, clean, and efficient, electric vehicles (EVs) may someday become a practical mode of transportation for the general public. Electric vehicles can provide many advantages for the nation's environment and energy supply because they run on electricity, which can be produced from many sources of energy such as coal, natural gas, uranium, and hydropower. These vehicles offer fuel versatility to the transportation sector, which depends almost solely on oil for its energy needs. Electric vehicles are any mode of transportation operated by a motor that receives electricity from a battery or fuel cell. EVs come in all shapes and sizes and may be used for different tasks. Some EVs are small and simple, such as golf carts and electric wheel chairs. Others are larger and more complex, such as automobile and vans. Some EVs, such as fork lifts, are used in industries. In this fact sheet, we will discuss mostly automobiles and vans. There are also variations on electric vehicles, such as hybrid vehicles and solar-powered vehicles. Hybrid vehicles use electricity as their primary source of energy, however, they also use a backup source of energy, such as gasoline, methanol or ethanol. Solar-powered vehicles are electric vehicles that use photovoltaic cells (cells that convert solar energy to electricity) rather than utility-supplied electricity to recharge the batteries. This paper discusses these concepts.

Not Available

1990-03-01T23:59:59.000Z

162

Communication and Coordination John H. Miller  

E-Print Network [OSTI]

Communication and Coordination John H. Miller Scott Moser February 25, 2003 Abstract Remarkable coordinate are not well understood. Here we examine the role of communication in achieving coordination this question we employ an adaptive model of strategically communicating agents (Miller et al. [7]) playing

163

Alamo Area Regional Public Transportation Coordination Plan  

E-Print Network [OSTI]

KFH GROUP, INC. ALAMO AREA REGIONAL PUBLIC TRANSPORTATION COORDINATION PLAN Developed for: The Alamo Area Council of Governments and the San Antonio-Bexar County Metropolitan Planning Organization By: KFH Group..............................................................................................................................4 SUMMARY OF TRAVEL PATTERNS IN THE ALAMO REGION...............................................9 COORDINATION AND SERVICE ALTERNATIVES .................................................................16 COORDINATED TRANSPORTATION: PLANNED...

Alamo Area Council of Governments

2006-11-30T23:59:59.000Z

164

Western Turbine | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:SeadovCooperative Jump to: navigation,Western Cooling EfficiencyWestern Springs isTurbine

165

Keep in mind, that with formality, often comes more of a standing...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Advisor, Department of Energy (confirmed) Western Electricity Coordinating Council (WECC) RTEP Status Update Byron Woertz, Senior Project Manager, WECC (confirmed) Western...

166

WESTERN UNIVERSITY DEPARTMENT OF CHEMISTRY  

E-Print Network [OSTI]

WESTERN UNIVERSITY DEPARTMENT OF CHEMISTRY The Department of Chemistry invites applications for a probationary (tenure-track) faculty position at the rank of Assistant Professor in Inorganic Chemistry, externally funded research program, and to develop and teach innovative courses in chemistry

Sinnamon, Gordon J.

167

WESTERN WATER ASSESSMENT WHITE PAPER  

E-Print Network [OSTI]

the socio-economic effects of drought. Strategic Goals Following the findings and recommendations from two (outside of agriculture) · Few "disaster" declarations · Not even a unified roster of drought eventsWESTERN WATER ASSESSMENT WHITE PAPER Tracking Socioeconomic Impacts of Drought with Rapid Analytics

Neff, Jason

168

Electric Vehicles  

ScienceCinema (OSTI)

Burak Ozpineci sees a future where electric vehicles charge while we drive them down the road, thanks in part to research under way at ORNL.

Ozpineci, Burak

2014-07-23T23:59:59.000Z

169

Electric Vehicles  

SciTech Connect (OSTI)

Burak Ozpineci sees a future where electric vehicles charge while we drive them down the road, thanks in part to research under way at ORNL.

Ozpineci, Burak

2014-05-02T23:59:59.000Z

170

Ch 16 Electric Charge &Ch 16. Electric Charge & Electric Field  

E-Print Network [OSTI]

Ch 16 Electric Charge &Ch 16. Electric Charge & Electric Field Liu UCD Phy1B 2012 #12;I Basic ConceptsI. Basic Concepts Static electricity: charges at rest Electric charge Like charges repel Unlike charges attract Liu UCD Phy1B 2012 #12;Electric ChargeElectric Charge Electron charge: -eElectron charge

Yoo, S. J. Ben

171

2011 Wind Technologies Market Report  

E-Print Network [OSTI]

June 2012. Western Electricity Coordinating Council (WECC).2011. WECC Efficient Dispatch Toolkit Cost-Benefit Analysis.Coordinating Council (WECC). 2010. Scope of the Efficient

Bolinger, Mark

2013-01-01T23:59:59.000Z

172

Wilson Wong The University of Western Australia, Australia  

E-Print Network [OSTI]

Wilson Wong The University of Western Australia, Australia Wei Liu The University of Western Australia, Australia Mohammed Bennamoun The University of Western Australia, Australia Ontology Learning

Hammerton, James

173

Remotely Sensed Thermal Anomalies in western Colorado  

SciTech Connect (OSTI)

Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Publication Date: 2012 Title: Landsat Thermal Anomalies Western Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science (CIRES), University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains the areas identified as areas of anomalous surface temperature from Landsat satellite imagery in Western Colorado. Data was obtained for two different dates. The digital numbers of each Landsat scene were converted to radiance and the temperature was calculated in degrees Kelvin and then converted to degrees Celsius for each land cover type using the emissivity of that cover type. And this process was repeated for each of the land cover types (open water, barren, deciduous forest and evergreen forest, mixed forest, shrub/scrub, grassland/herbaceous, pasture hay, and cultivated crops). The temperature of each pixel within each scene was calculated using the thermal band. In order to calculate the temperature an average emissivity value was used for each land cover type within each scene. The NLCD 2001 land cover classification raster data of the zones that cover Colorado were downloaded from USGS site and used to identify the land cover types within each scene. Areas that had temperature residual greater than 2?, and areas with temperature equal to 1? to 2?, were considered Landsat modeled very warm and warm surface exposures (thermal anomalies), respectively Spatial Domain: Extent: Top: 4546381.234113 m Left: 140556.857021 m Right: 573390.000000 m Bottom: 4094583.641581 m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System ’1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shape file

Hussein, Khalid

2012-02-01T23:59:59.000Z

174

Electric machine  

DOE Patents [OSTI]

An interior permanent magnet electric machine is disclosed. The interior permanent magnet electric machine comprises a rotor comprising a plurality of radially placed magnets each having a proximal end and a distal end, wherein each magnet comprises a plurality of magnetic segments and at least one magnetic segment towards the distal end comprises a high resistivity magnetic material.

El-Refaie, Ayman Mohamed Fawzi (Niskayuna, NY); Reddy, Patel Bhageerath (Madison, WI)

2012-07-17T23:59:59.000Z

175

Western Wind and Solar Integration Study  

SciTech Connect (OSTI)

This report provides a full description of the Western Wind and Solar Integration Study (WWSIS) and its findings.

GE Energy

2010-05-01T23:59:59.000Z

176

Nonlinear Model Based Coordinated Adaptive Robust Control of Electro-hydraulic Robotic Arms via Overparametrizing Method  

E-Print Network [OSTI]

Nonlinear Model Based Coordinated Adaptive Robust Control of Electro-hydraulic Robotic Arms via by electrical motors, hydraulic robot arms have a richer nonlinear dynam- ics and stronger couplings among uncertainties only. Simulation and experimental results on a three degree-of-freedom (DOF) hydraulic robot arm

Yao, Bin

177

energy: Supply, Demand, and impacts CooRDinATinG LeAD AUThoR  

E-Print Network [OSTI]

240 chapter 12 energy: Supply, Demand, and impacts CooRDinATinG LeAD AUThoR Vincent C. Tidwell the potential to impact the production, demand, and delivery of energy in a number of ways. Chapter citation;energy: supply, demand, and impacts 241 · Delivery of electricity may become more vulnerable

Kammen, Daniel M.

178

Western Michigan University Office of Admissions  

E-Print Network [OSTI]

Western Michigan University Office of Admissions 1903 W Michigan Ave Kalamazoo MI 49008-5211 (269 for future reference) Eligibility REquiREmEnts Western Michigan University considers current high school: Western Michigan University AccountsReceivable 1903WMichiganAve KalamazooMI49008-5210 non-u.s. citiz

de Doncker, Elise

179

adamantine-dicarboxylate coordination complexes: Topics by E...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Multiagent systems, Coordination, Planning, Resource Kropf, Peter 25 Optical Design of Reflectionless Complex Media by Finite Embedded Coordinate Transformations...

180

Western Solargenics | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:SeadovCooperative Jump to: navigation,Western Cooling Efficiency

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Integrating Variable Renewable Energy in Electric Power Markets: Best Practices from International Experience  

SciTech Connect (OSTI)

Many countries -- reflecting very different geographies, markets, and power systems -- are successfully managing high levels of variable renewable energy on the electric grid, including that from wind and solar energy. This study documents the diverse approaches to effective integration of variable renewable energy among six countries -- Australia (South Australia), Denmark, Germany, Ireland, Spain, and the United States (Western region-Colorado and Texas)-- and summarizes policy best practices that energy ministers and other stakeholders can pursue to ensure that electricity markets and power systems can effectively coevolve with increasing penetrations of variable renewable energy. Each country has crafted its own combination of policies, market designs, and system operations to achieve the system reliability and flexibility needed to successfully integrate renewables. Notwithstanding this diversity, the approaches taken by the countries studied all coalesce around five strategic areas: lead public engagement, particularly for new transmission; coordinate and integrate planning; develop rules for market evolution that enable system flexibility; expand access to diverse resources and geographic footprint of operations; and improve system operations. The ability to maintain a broad ecosystem perspective, to organize and make available the wealth of experiences, and to ensure a clear path from analysis to enactment should be the primary focus going forward.

Cochran, J.; Bird, L.; Heeter, J.; Arent, D. A.

2012-04-01T23:59:59.000Z

182

Homeland Security and Emergency Management Coordination (HSEMC...  

National Nuclear Security Administration (NNSA)

Homeland Security and Emergency Management Coordination (HSEMC) Program | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

183

Safety and Security Enforcement Coordinator Handbook  

Broader source: Energy.gov (indexed) [DOE]

SAFETY AND SECURITY ENFORCEMENT COORDINATOR HANDBOOK August 2012 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy AUGUST 2012 DOE...

184

Coordination of Energy Efficiency and Demand Response  

E-Print Network [OSTI]

to ensure reliability. Capacity market programs: Customerswholesale, forward capacity markets offer new opportunitiesinto the forward-capacity market. Coordination of Energy

Goldman, Charles

2010-01-01T23:59:59.000Z

185

Athletic Training Coordinator Hometown: Colorado Springs, CO  

E-Print Network [OSTI]

WHO WE ARE Gaby Bell Athletic Training Coordinator Hometown: Colorado Springs, CO Certifications Athletic Training Graduate Assistant Jonathan Hodapp Student Athletic Trainer Mike Carlson Student Athletic

Van Stryland, Eric

186

Minnesota Environmental Coordination Procedures Act (Minnesota)  

Broader source: Energy.gov [DOE]

This Act is designed to streamline the review procedures for a given project that requires multiple environmental permits “by establishing a mechanism in state government which will coordinate...

187

Coordination of Energy Efficiency and Demand Response  

E-Print Network [OSTI]

of Energy demand-side management energy information systemdemand response. Demand-side management (DSM) program goalsa goal for demand-side management (DSM) coordination and

Goldman, Charles

2010-01-01T23:59:59.000Z

188

Energy Agency Coordinators for Energy Action Month  

Broader source: Energy.gov [DOE]

Agency coordinators serve as primary Federal agency points of contact for Energy Action Month. Contact them if you have questions about implementing an Energy Action Month campaign.

189

Optimization Online - An Accelerated Proximal Coordinate Gradient ...  

E-Print Network [OSTI]

Jul 7, 2014 ... An Accelerated Proximal Coordinate Gradient Method and its Application to Regularized Empirical Risk Minimization. Qihang Lin(qihang-lin ...

Qihang Lin

2014-07-07T23:59:59.000Z

190

Coordination Chemistry in magnesium battery electrolytes: how...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Chemistry in magnesium battery electrolytes: how ligands affect their performance. Coordination Chemistry in magnesium battery electrolytes: how ligands affect their performance....

191

Coordination of Energy Efficiency and Demand Response  

E-Print Network [OSTI]

District Small Business Summer Solutions: Energy and DemandSummer Solutions: Energy and Demand Impacts Monthly Energy> B-2 Coordination of Energy Efficiency and Demand Response

Goldman, Charles

2010-01-01T23:59:59.000Z

192

Electrical connector  

DOE Patents [OSTI]

An electrical connector includes a female component having one or more receptacles, a first test receptacle, and a second test receptacle. The electrical connector also includes a male component having one or more terminals configured to engage the one or more receptacles, a first test pin configured to engage the first test receptacle, and a second test pin configured to engage the second test receptacle. The first test receptacle is electrically connected to the second test receptacle, and at least one of the first test pin and the second test pin is shorter in length than the one or more terminals.

Dilliner, Jennifer L.; Baker, Thomas M.; Akasam, Sivaprasad; Hoff, Brian D.

2006-11-21T23:59:59.000Z

193

Norm G. Hall Western Australian Marine Research laboratories  

E-Print Network [OSTI]

Norm G. Hall Western Australian Marine Research laboratories Perth, Western Australia 6020, Western Australia. 61 50. Australia Ian C. Potter* School of Biological and Environmental Sciences, Murdoch University. Murdoch, Western Australia. 6 J50, Australia Comparisons between generalized growth

194

Western Interconnection Energy Imbalance Market Status and Prospects (Presentation)  

SciTech Connect (OSTI)

This presentation describes how a new wholesale electricity market for energy imbalance ancillary services could be implemented and operated. Some conclusions of this presentation are: (1) Method for calculating additional reserve requirements due to wind and solar production; (2) EIM results in substantial reduction in reserves requirements and ramping demand; (3) Reduced participation reduces benefits for all but reduces the benefits to non-participants the most; (4) Full participation leads to maximum benefit across the Western Interconnection, up to 42% of total reserve requirement; and (5) Regional EIM implementations have smaller but substantial benefits.

Milligan, M.; Kirby, B.; King, J.; Beuning, S.

2011-10-01T23:59:59.000Z

195

EA-98-I Western Systems Power Pool | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergy DOEDealingVehicle1 Closing American Electric0-A2 GDFBI Western

196

EA-98-J Western Systems Power Pool | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergy DOEDealingVehicle1 Closing American Electric0-A2 GDFBI WesternJ

197

EA-98-K Western Systems Power Pool | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergy DOEDealingVehicle1 Closing American Electric0-A2 GDFBI WesternJK

198

EA-98-L Western Systems Power Pool | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergy DOEDealingVehicle1 Closing American Electric0-A2 GDFBI WesternJKL

199

Utilities Dist-Western IN REMC | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectric Coop,Save Energy NowNew Hampshire AddressGRR HomeDist-Western IN REMC

200

Western Farmers Elec Coop, Inc | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectric Coop,Save EnergyGlouster,Winside,WarrenWellsLoading map...Topeka,Western

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Wiedenhfer et al. Inter-Organizational Crisis Management Infrastructure for Electrical Power Breakdowns  

E-Print Network [OSTI]

.pipek}@uni-siegen.de ABSTRACT Major electricity breakdowns like the Northeast Blackout (USA) in 2003 or the blackout in most on electricity, as was the case in 2003 in the Northeast Blackout, USA, or 2005 in Western Europe (Lorenz, 2010Wiedenhöfer et al. Inter-Organizational Crisis Management Infrastructure for Electrical Power

202

Engineering Electrical &  

E-Print Network [OSTI]

Computer Engineering Electrical & Electronic Engineering Mechatronics Engineering Mechanical Engineering Civil Engineering Natural Resources Engineering Forest Engineering Chemical & Process Engineering ELECTIVE 2 Required Engineering Intermediate Year 2011 Eight Required Courses Chart: 120 points College

Hickman, Mark

203

Engineering Electrical &  

E-Print Network [OSTI]

Computer Engineering Electrical & Electronic Engineering Mechatronics Engineering Mechanical Engineering Civil Engineering Natural Resources Engineering Forest Engineering Chemical & Process Engineering ELECTIVE 2 Required Engineering Intermediate Year 2012 Eight Required Courses Chart: 120 points College

Hickman, Mark

204

Western Area Power Administration Rocky Mountain Region (Western)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched FerromagnetismWaste and MaterialsWenjun Deng Associate ResearchWestern AreaRocky

205

Energy Materials Coordinating Committee (EMaCC)  

SciTech Connect (OSTI)

This report summarizes EMaCC activities for fiscal year 1990 and describes the materials research programs of various offices and divisions within the department. The DOE Energy Materials Coordinating Committee (EMaCC) serves primarily to enhance coordination among the Department's materials programs and to further the effective use of materials expertise within the department. (JL)

Not Available

1991-05-31T23:59:59.000Z

206

Western Hemisphere Oil Products Balance  

Gasoline and Diesel Fuel Update (EIA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines About U.S. NaturalA. Michael SchaalNovember1. Foreign salesWestern Hemisphere Oil

207

An infrared spectroscopy study of carbon monoxide adsorption on. alpha. -chromia surfaces: Probing oxidation states of coordinatively unsaturated surface cations  

SciTech Connect (OSTI)

CO adsorption on thermoevacuated, H{sub 2}-reduced and O{sub 2}-treated {alpha}-chromia surfaces was studied by IR spectroscopy in the temperature range 77-298 K. Coordinatively unsaturated (cus) Cr{sup 3+} cation sites, probably in 3-coordinate and to a much lesser extent 5-coordinate states, are the adsorption sites on H{sub 2}-reduced {alpha}-Cr{sub 2}O{sub 3}. The surface containing excess oxygen also exposes cus Cr{sup 4+} and Cr{sup 5+} sites. An empirical procedure is described which permits the determination of oxidation state and coordination number of the cus surface sites. This procedure is based on a correlation between C-O stretching frequency and electric field strength exerted by the cation. The latter is calculated from Pauling's strength of the electrostatic bond and effective ionic radii, both of which take the cation coordination into account.

Zaki, M.I.; Knoezinger, H. (Universitaet Muenchen (West Germany))

1989-10-01T23:59:59.000Z

208

Application to Export Electric Energy OE Docket No. EA-98-M WSPP...  

Broader source: Energy.gov (indexed) [DOE]

Western Systems Power Pool Application to Export Electric Energy OE Docket No. EA-386 IPR-GDF SUEZ Energy Marketing (GSEMNA): Federal Register Notice, Volume 77, No. 129 - July...

209

EIS-0011: New Melones 230-kV Electrical Transmission Line, Central Valley Project, California  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Western Area Power Administration prepared this statement to evaluate the environmental impacts of proposed development of an electrical transmission system for the New Melones Power Plant.

210

Electrical hazards  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed NewcatalystNeutronEnvironmentZIRKLEEFFECTS OFElaineElectric826Lab Electrical6,

211

Problems of intraplate extensional tectonics, Western United...  

Open Energy Info (EERE)

on the Great Basin Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Proceedings: Problems of intraplate extensional tectonics, Western United...

212

General noncommuting curvilinear coordinates and fluid Mechanics  

E-Print Network [OSTI]

We show that restricting the states of a charged particle to the lowest Landau level introduces noncommutativity between general curvilinear coordinate operators. The cartesian, circular cylindrical and spherical polar coordinates are three special cases of our quite general method. The connection between U(1) gauge fields defined on a general noncommuting curvilinear coordinates and fluid mechanics is explained. We also recognize the Seiberg-Witten map from general noncommuting to commuting variables as the quantum correspondence of the Lagrange to Euler map in fluid mechanics.

S. A. Alavi

2006-08-16T23:59:59.000Z

213

at Western University Located in London, Ontario, Western University is situated directly in the  

E-Print Network [OSTI]

ProjectCentre@Western: joint venture between Western and the Fraunhofer Institute of Chemical Technology in Germany · As Canada, construction, clean technologies, IT and energy storage Wind Engineering · Boundary

Denham, Graham

214

ELECTRICAL & INFORMATION  

E-Print Network [OSTI]

focuses on. · Smart Grids: Electricity networks are designed to transport energy from where of energy and smarter management of the system. These are called Smart Grids. A number of research projects in medical informatics, smart cities, mining, energy, financial systems, etc. · Bioinformatics

Wagner, Stephan

215

Clause chaining, switch reference and coordination  

E-Print Network [OSTI]

In this thesis I ponder over a constellation of phenomena that revolve around switch reference and coordination, drawing mainly on their instantiation in Kisedje (Je, Brazil). I start by investigating Klsedje's case system. ...

Nonato, Rafael

2014-01-01T23:59:59.000Z

216

Australia and New Zealand Coordinating Lead Authors  

E-Print Network [OSTI]

11 Australia and New Zealand Coordinating Lead Authors: Kevin Hennessy (Australia), Blair Fitzharris (New Zealand) Lead Authors: Bryson C. Bates (Australia), Nick Harvey (Australia), Mark Howden (Australia), Lesley Hughes (Australia), Jim Salinger (New Zealand), Richard Warrick (New Zealand

Green, Donna

217

SPACECRAFT COORDINATION CONTROL USING PID+ BACKSTEPPING  

E-Print Network [OSTI]

SPACECRAFT COORDINATION CONTROL USING PID+ BACKSTEPPING Raymond Kristiansen Thomas R. Krogstad a PID+ solution to the problem of relative translational and rotational tracking, using the concept are presented to show the controller performance. Keywords: Spacecraft formation, integrator backstepping, PID

Gravdahl, Jan Tommy

218

What is wrong with Schwarzschild's coordinates?  

E-Print Network [OSTI]

A strict derivation of the Schwarzschild metric, based solely on Newton's law of free fall and the equivalence principle, is presented. In the light of it, regarding Schwarzschild's coordinates as representing the point of view of a distant observer resting relative to the source of a centrally symmetric gravitational field, proves illegitimate. Such point of view is better represented by the Painleve-Gullstrand system of coordinates, which agrees with Schwarzschild's system with respect to its spatial coordinates and time scale, but disagrees with respect to the relation of simultaneity. A duality of the Schwarzschild solution and its time-irreversibility is suggested. The physical meaning of the coordinate singularity at the Schwarzschild radius is clarified.

J. Czerniawski

2004-11-12T23:59:59.000Z

219

Ecosystems & Fisheries-Oceanography Coordinated Investigations  

E-Print Network [OSTI]

Ecosystems & Fisheries-Oceanography Coordinated Investigations · Healthy and productive coastal Communities Fishing Industry & Coastal Infrastructure Marine Ecosystem Original Paradigm #12;We had Consumers & Coastal Communities Fishing Industry & Coastal Infrastructure Marine Ecosystem Control

220

Coordination of General Accounting Office Activities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order provides policies, procedures, and responsibilities for the coordination of General Accounting Office activities and actions required when GAO reports contain recommendations pertaining to the DOE. Cancels DOE O 2340.1B.

1992-06-08T23:59:59.000Z

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Loss of coordination in competitive supply chains  

E-Print Network [OSTI]

The loss of coordination in supply chains quantifies the inefficiency (i.e. the loss of total profit) due to the presence of competition in the supply chain. In this thesis, we discuss four models: one model with multiple ...

Teo, Koon Soon

2009-01-01T23:59:59.000Z

222

Improving offshore communication by choosing the right coordination  

E-Print Network [OSTI]

Improving offshore communication by choosing the right coordination strategy Matthias Fabriek;Improving offshore communication by choosing the right coordination strategy Page 2 of 92 ABSTRACT This thesis researches communication and coordination in offshore custom software development (CSD) projects

Utrecht, Universiteit

223

Policy Statement Number: PS-49 Title/Topic: Building Coordinator  

E-Print Network [OSTI]

. 10. Report all landscape maintenance problems, including drainage problems or grounds upkeep group responsible for coordinating maintenance requests and activities within that building or building Coordinators are responsible for coordinating maintenance requests and activities within the building

Harms, Kyle E.

224

Journal of Educational Psychology Applying Grounded Coordination Challenges to Concrete  

E-Print Network [OSTI]

Journal of Educational Psychology Applying Grounded Coordination Challenges to Concrete Learning, M. I. (2013, August 19). Applying Grounded Coordination Challenges to Concrete Learning Materials.1037/a0034098 #12;Applying Grounded Coordination Challenges to Concrete Learning Materials: A Study

225

Operating Reserve Reductions from a Proposed Energy Imbalance Market with Wind and Solar Generation in the Western Interconnection  

SciTech Connect (OSTI)

This paper considers several alternative forms of an energy imbalance market (EIM) proposed in the nonmarket areas of the Western Interconnection. The proposed EIM includes two changes in operating practices that independently reduce variability and increase access to responsive resources: balancing authority cooperation and sub-hourly dispatch. As the penetration of variable generation increases on the power system, additional interest in coordination would likely occur. Several alternative approaches could be used, but consideration of any form of coordinated unit commitment is beyond the scope of this analysis. This report examines the benefits of several possible EIM implementations--both separately and in concert.

King, J.; Kirby, B.; Milligan, M.; Beuning, S.

2012-05-01T23:59:59.000Z

226

LABORATORY II ELECTRIC FIELDS AND ELECTRIC POTENTIALS  

E-Print Network [OSTI]

Lab II - 1 LABORATORY II ELECTRIC FIELDS AND ELECTRIC POTENTIALS In this lab you will continue to investigate the abstract concept of electric field. If you know the electric field at a point in space, you). With this simulation you can construct a complicated charge configuration and read out the resulting electric field

Minnesota, University of

227

Electrical and Computer Engineering Electrical Engineering  

E-Print Network [OSTI]

Electrical and Computer Engineering Electrical Engineering Department Website: www.iit.edu/engineering/ece Electrical engineering is concerned with the generation, transmission, and utilization of electrical energy and with the transmitting and processing of information. Electrical engineers are involved in the analysis, design, and pro

Heller, Barbara

228

Relationships between Western Area Power Administration`s power marketing program and hydropower operations at Salt Lake City area integrated projects  

SciTech Connect (OSTI)

This technical memorandum provides background information on the Western Area Power Administration (Western) and the physical characteristics of the Salt Lake City Area Integrated Projects (SLCA/IP) hydropower plants, which include the Colorado River Storage Project, the Rio Grande Project, and the Collbran Project. In addition, the history, electrical capacity, storage capacity, and flow restrictions at each dam are presented. An overview of Western`s current programs and services, including a review of statutory authorities, agency discretion, and obligations, is also provided. The variability of SLCA/IP hourly generation under various alternative marketing strategies and purchasing programs is discussed. The effects of Western`s services, such as area load control, outage assistance, and transmission, on SLCA/IP power plant operations are analyzed.

Veselka, T.D.; Folga, S.; Poch, L.A. [and others

1995-03-01T23:59:59.000Z

229

Coordinating Permit Offices and the Development of Utility-Scale Geothermal Energy (Presentation)  

SciTech Connect (OSTI)

Permitting is a major component of the geothermal development process. Better coordination across government agencies could reduce uncertainty of the process and the actual time of permitting. This presentation highlights various forms of coordinating permit offices at the state and federal level in the western United States, discusses inefficiencies and mitigation techniques for permitting natural resource projects, analyzes whether various approaches are easily adaptable to utility-scale geothermal development, and addresses advantages and challenges for coordinating permit offices. Key successful strategies identified include: 1. Flexibility in implementing the approach (i.e. less statutory requirements for the approach); 2. Less dependence on a final environmental review for information sharing and permit coordination; 3. State and federal partnerships developed through memorandum of understanding to define roles and share data and/or developer information. A few of the most helpful techniques include: 1. A central point of contact for the developer to ask questions surrounding the project; 2. Pre-application meetings to assist the developer in identifying all of the permits, regulatory approvals, and associated information or data required; 3. A permit schedule or timeline to set expectations for the developer and agencies; 4. Consolidating the public notice, comment, and hearing period into fewer hearings held concurrently.

Levine, A.; Young, K.; Witherbee, K.

2013-10-01T23:59:59.000Z

230

Case Western Reserve University Chart of Accounts  

E-Print Network [OSTI]

Case Western Reserve University Chart of Accounts July 7, 2004 1 SPEEDTYPE / PROJECT PREFIXES Funds PLT Plant CIP Construction in Progress #12;Case Western Reserve University Chart of Accounts July Annual Fund Gift RES Research TRN Training SPC Special Programs/Projects OSA Other Sponsored Activities

Rollins, Andrew M.

231

Western Michigan University Office of Admissions  

E-Print Network [OSTI]

Western Michigan University Office of Admissions 1903 W Michigan Ave Kalamazoo MI 49008-5211 (269 __________________________________________________________________________ Date __________________________________ Please return to: Western Michigan University · Office Readmission Office of Admissions 1903 W Michigan Ave Kalamazoo MI 49008-5211 Returning Students (Good Standing

de Doncker, Elise

232

2011 Annual Report [WESTERN AREA POWER ADMINISTRATION  

SciTech Connect (OSTI)

Western’s achievements for 2011 are reported and include: Experienced a banner water year – meaning more hydropower delivered; Changed energy scheduling— to better support intermittent renewable resources; Maintained reliability— ensuring maximum use of the grid by reducing the frequency and duration of planned and unplanned outages; Connected communities— providing customers energy products and related services at cost-based rates; Managed transmission projects.

none,

2011-01-01T23:59:59.000Z

233

Spin transition in a four-coordinate iron oxide  

SciTech Connect (OSTI)

The spin transition, or spin crossover, is a manifestation of electronic instability induced by external constraints such as pressure1. Among known examples that exhibit spin transition, 3d ions with d6 electron configurations represent the vast majority, but the spin transition observed thus far has been almost exclusively limited to that between high-spin (S = 2) and low-spin (S = 0) states2-9. Here we report a novel high-spin to intermediate-spin (S = 1) state transition at 33 GPa induced by pressurization of an antiferromagnetic insulator SrFeO2 with a square planar coordination10. The change in spin multiplicity brings to ferromagnetism as well as metallicity, yet keeping the ordering temperature far above ambient. First-principles calculations attribute the origin of the transition to the strong inlayer hybridization between Fe dx 2 -y 2 O p , leading to a pressure-induced electronic instability toward the depopulation of Fe dx 2 -y 2 O p antibonding states. Furthermore, the ferromagnetic S = 1 state is half-metallic due to the inception of half-occupied spin-down (dxz, dyz) degenerate states upon spin transition. These results highlight the square-planar coordinated iron oxides as a new class of magnetic and electric materials and provide new avenues toward realizing multi-functional sensors and data-storage devices.

Kawakami, T. [Nihon University, Tokyo; Sutou, S. [Nihon University, Tokyo; Hirama, H. [Nihon University, Tokyo; Sekiya, Y. [Nihon University, Tokyo; Makino, T. [Nihon University, Tokyo; Tsujimoto, Y. [Kyoto University, Japan; Kitada, A. [Kyoto University, Japan; Tassel, C. [Kyoto University, Japan; Kageyama, H. [Kyoto University, Japan; Yoshimura, K. [Kyoto University, Japan; Chen, Xingqiu [ORNL; Fu, Chong Long [ORNL; Okada, T. [University of Tokyo, Tokyo, Japan; Yagi, T. [University of Tokyo, Tokyo, Japan; Hayashi, N. [Kyoto University, Japan; Nasu, S. [Osaka University; Podloucky, R. [Institut fur Physikalische Chemie der RWTH; Takano, M. [Kyoto University, Japan

2009-01-01T23:59:59.000Z

234

Coordination of Care in Substance Abuse Treatment: An Interorganizational Perspective  

E-Print Network [OSTI]

substance abuse treatment under the Affordable Care Act.Coordination of Care in Substance Abuse Treatment: AnCoordination of Care in Substance Abuse Treatment: An

Spear, Suzanne Evelyn

2012-01-01T23:59:59.000Z

235

Innovation and Coordination at the Callifornia Fuel Cell Partnership...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Innovation and Coordination at the Callifornia Fuel Cell Partnership Innovation and Coordination at the Callifornia Fuel Cell Partnership Presented at Refueling Infrastructure for...

236

Fuel Cell Transit Bus Coordination and Evaluation Plan California...  

Broader source: Energy.gov (indexed) [DOE]

Transit Bus Coordination and Evaluation Plan California Fuel Cell Transit Evaluation Team Fuel Cell Transit Bus Coordination and Evaluation Plan California Fuel Cell Transit...

237

DOE Releases EPRI Report on Benefits of Regional Coordination...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

DOE Releases EPRI Report on Benefits of Regional Coordination in Wind Energy Transfers DOE Releases EPRI Report on Benefits of Regional Coordination in Wind Energy Transfers...

238

Electrical Safety Committee Charter  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ANL Electrical Safety Page DOE Electrical Safety Handbook General Statement Home & Office Equipment Statement APS Electrical Safety Update Guidelines for Working on Voltages < 240...

239

High Temperatures & Electricity Demand  

E-Print Network [OSTI]

High Temperatures & Electricity Demand An Assessment of Supply Adequacy in California Trends.......................................................................................................1 HIGH TEMPERATURES AND ELECTRICITY DEMAND.....................................................................................................................7 SECTION I: HIGH TEMPERATURES AND ELECTRICITY DEMAND ..........................9 BACKGROUND

240

Well-to-wheels analysis of energy use and greenhouse gas emissions of plug-in hybrid electric vehicles.  

SciTech Connect (OSTI)

Plug-in hybrid electric vehicles (PHEVs) are being developed for mass production by the automotive industry. PHEVs have been touted for their potential to reduce the US transportation sector's dependence on petroleum and cut greenhouse gas (GHG) emissions by (1) using off-peak excess electric generation capacity and (2) increasing vehicles energy efficiency. A well-to-wheels (WTW) analysis - which examines energy use and emissions from primary energy source through vehicle operation - can help researchers better understand the impact of the upstream mix of electricity generation technologies for PHEV recharging, as well as the powertrain technology and fuel sources for PHEVs. For the WTW analysis, Argonne National Laboratory researchers used the Greenhouse gases, Regulated Emissions, and Energy use in Transportation (GREET) model developed by Argonne to compare the WTW energy use and GHG emissions associated with various transportation technologies to those associated with PHEVs. Argonne researchers estimated the fuel economy and electricity use of PHEVs and alternative fuel/vehicle systems by using the Powertrain System Analysis Toolkit (PSAT) model. They examined two PHEV designs: the power-split configuration and the series configuration. The first is a parallel hybrid configuration in which the engine and the electric motor are connected to a single mechanical transmission that incorporates a power-split device that allows for parallel power paths - mechanical and electrical - from the engine to the wheels, allowing the engine and the electric motor to share the power during acceleration. In the second configuration, the engine powers a generator, which charges a battery that is used by the electric motor to propel the vehicle; thus, the engine never directly powers the vehicle's transmission. The power-split configuration was adopted for PHEVs with a 10- and 20-mile electric range because they require frequent use of the engine for acceleration and to provide energy when the battery is depleted, while the series configuration was adopted for PHEVs with a 30- and 40-mile electric range because they rely mostly on electrical power for propulsion. Argonne researchers calculated the equivalent on-road (real-world) fuel economy on the basis of U.S. Environmental Protection Agency miles per gallon (mpg)-based formulas. The reduction in fuel economy attributable to the on-road adjustment formula was capped at 30% for advanced vehicle systems (e.g., PHEVs, fuel cell vehicles [FCVs], hybrid electric vehicles [HEVs], and battery-powered electric vehicles [BEVs]). Simulations for calendar year 2020 with model year 2015 mid-size vehicles were chosen for this analysis to address the implications of PHEVs within a reasonable timeframe after their likely introduction over the next few years. For the WTW analysis, Argonne assumed a PHEV market penetration of 10% by 2020 in order to examine the impact of significant PHEV loading on the utility power sector. Technological improvement with medium uncertainty for each vehicle was also assumed for the analysis. Argonne employed detailed dispatch models to simulate the electric power systems in four major regions of the US: the New England Independent System Operator, the New York Independent System Operator, the State of Illinois, and the Western Electric Coordinating Council. Argonne also evaluated the US average generation mix and renewable generation of electricity for PHEV and BEV recharging scenarios to show the effects of these generation mixes on PHEV WTW results. Argonne's GREET model was designed to examine the WTW energy use and GHG emissions for PHEVs and BEVs, as well as FCVs, regular HEVs, and conventional gasoline internal combustion engine vehicles (ICEVs). WTW results are reported for charge-depleting (CD) operation of PHEVs under different recharging scenarios. The combined WTW results of CD and charge-sustaining (CS) PHEV operations (using the utility factor method) were also examined and reported. According to the utility factor method, the share of vehicle miles trav

Elgowainy, A.; Han, J.; Poch, L.; Wang, M.; Vyas, A.; Mahalik, M.; Rousseau, A.

2010-06-14T23:59:59.000Z

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Getting Ready for Electric Drive: the Plug-In Vehicle and Infrastructure Workshop  

Broader source: Energy.gov [DOE]

Local government leaders, utilities, car makers and electric-vehicle infrastructure providers came together to discuss how they can best coordinate their efforts at the Plug-in Vehicle and Infrastructure Workshop.

242

Raft River Rural Electric Coop. Vigilante Electric Coop. Northern  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Farmers Electric Riverside Electric Minidoka Soda Springs Idaho Falls Lower Valley Energy Lost River Electric Coop. Fall River Rural Electric Coop. Salmon River Electric...

243

Illinois Municipal Electric Agency- Electric Efficiency Program  

Broader source: Energy.gov [DOE]

The Illinois Municipal Electric Agency (IMEA) offers rebates to member municipal utilities* (those who purchase wholesale electric service from IMEA) and retail customers for energy efficiency...

244

Western Employee Presents Wind Award to Minnkota | Department...  

Broader source: Energy.gov (indexed) [DOE]

Western Employee Presents Wind Award to Minnkota Western Employee Presents Wind Award to Minnkota April 7, 2011 - 2:47pm Addthis Randy Manion Director of Renewable Energy, Western...

245

Preliminary Notice of Violation,Western Allied Mechanical, Inc...  

Broader source: Energy.gov (indexed) [DOE]

Western Allied Mechanical, Inc. - WEA-2009-03 Preliminary Notice of Violation,Western Allied Mechanical, Inc. - WEA-2009-03 April 7, 2009 Issued to Western Allied Mechanical, Inc....

246

ELECTRICAL ENGINEERING EECS Department  

E-Print Network [OSTI]

ELECTRICAL ENGINEERING EECS Department The Electrical Engineering and Computer Science (EECS) Department at WSU offers undergraduate degrees in electrical engineering, computer engineering and computer science. The EECS Department offers master of science degrees in computer science, electrical engineering

247

Renewable Electricity Futures Study  

E-Print Network [OSTI]

Renewable Electricity Futures Study Renewable Electricity Generation and Storage Technologies for Sustainable Energy, LLC. #12;Renewable Electricity Futures Study Edited By Hand, M.M. National Renewable;Suggested Citations Renewable Electricity Futures Study (Entire Report) National Renewable Energy Laboratory

248

Low cation coordination in oxide melts  

SciTech Connect (OSTI)

The complete set of Faber-Ziman partial pair distribution functions for a rare earth oxide liquid were measured for the first time by combining aerodynamic levitation, neutron diffraction, high energy x-ray diffraction and isomorphic substitution using Y2 O3 and Ho2 O3 melts. The average Y- O coordination is measured to be 5.5(2), which is significantly less than the octahedral coordination of crystalline Y2 O3 (or Ho2 O3 ). Investigation of high temperature La2 O3 , ZrO2 , SiO2 , and Al2 O3 melts by x-ray diffraction and molecular dynamics simulations also show lower-than-crystal cation- oxygen coordination. These measurements suggest a general trend towards lower M-O coordination compared to their crystalline counterparts. It is found that this coordination number drop is larger for lower field strength, larger radius cations and is negligible for high field strength (network forming) cations. These findings have broad implications for predicting the local structure and related physical properties of metal-oxide melts and oxide glasses.

Skinner, Lawrie [State University of New York, Stony Brook] [State University of New York, Stony Brook; Benmore, Chris J [Argonne National Laboratory (ANL)] [Argonne National Laboratory (ANL); Du, Jincheng [University of North Texas] [University of North Texas; Weber, Richard [Argonne National Laboratory (ANL)] [Argonne National Laboratory (ANL); Neuefeind, Joerg C [ORNL] [ORNL; Tumber, Sonia [Materials Development, Inc., Evanston, IL] [Materials Development, Inc., Evanston, IL; Parise, John B [Stony Brook University (SUNY)] [Stony Brook University (SUNY)

2014-01-01T23:59:59.000Z

249

Coordination and Efficiency in Decentralized Collaboration  

E-Print Network [OSTI]

Environments for decentralized on-line collaboration are now widespread on the Web, underpinning open-source efforts, knowledge creation sites including Wikipedia, and other experiments in joint production. When a distributed group works together in such a setting, the mechanisms they use for coordination can play an important role in the effectiveness of the group's performance. Here we consider the trade-offs inherent in coordination in these on-line settings, balancing the benefits to collaboration with the cost in effort that could be spent in other ways. We consider two diverse domains that each contain a wide range of collaborations taking place simultaneously -- Wikipedia and GitHub -- allowing us to study how coordination varies across different projects. We analyze trade-offs in coordination along two main dimensions, finding similar effects in both our domains of study: first we show that, in aggregate, high-status projects on these sites manage the coordination trade-off at a different level than t...

Romero, Daniel M; Kleinberg, Jon

2015-01-01T23:59:59.000Z

250

Preparation for upgrading western subbituminous coal  

SciTech Connect (OSTI)

The objective of this project was to establish the physical and chemical characteristics of western coal and determine the best preparation technologies for upgrading this resource. Western coal was characterized as an abundant, easily mineable, clean, low-sulfur coal with low heating value, high moisture, susceptibility to spontaneous ignition, and considerable transit distances from major markets. Project support was provided by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The research was conducted by the Western Research Institute, (WRI) in Laramie, Wyoming. The project scope of work required the completion of four tasks: (1) project planning, (2) literature searches and verbal contacts with consumers and producers of western coal, (3) selection of the best technologies to upgrade western coal, and (4) identification of research needed to develop the best technologies for upgrading western coals. The results of this research suggest that thermal drying is the best technology for upgrading western coals. There is a significant need for further research in areas involving physical and chemical stabilization of the dried coal product. Excessive particle-size degradation and resulting dustiness, moisture reabsorption, and high susceptibility to spontaneous combustion are key areas requiring further research. Improved testing methods for the determination of equilibrium moisture and susceptibility to spontaneous ignition under various ambient conditions are recommended.

Grimes, R.W.; Cha, C.Y.; Sheesley, D.C.

1990-11-01T23:59:59.000Z

251

Transverse electric conductivity of quantum collisional plasmas  

E-Print Network [OSTI]

Formulas for calculation of transverse dielectric function and transverse electric conductivity in quantum collisional plasmas under arbitrary degree of degeneracy of the electron gas are received. The Wigner - Vlasov - Boltzmann kinetic equation with collision integral in BGK (Bhatnagar, Gross and Krook) form in coordinate space is used. Various special cases are investigated. The case of fully degenerate quantum plasma was considered separately. Comparison with Lindhard's formula has been realized.

A. V. Latyshev; A. A. Yushkanov

2010-07-06T23:59:59.000Z

252

Electrical receptacle  

DOE Patents [OSTI]

The invention is a receptacle for a three prong electrical plug which has either a tubular or U-shaped grounding prong. The inventive receptacle has a grounding prong socket which is sufficiently spacious to prevent the socket from significantly stretching when a larger, U-shaped grounding prong is inserted into the socket, and having two ridges to allow a snug fit when a smaller tubular shape grounding prong is inserted into the socket. The two ridges are made to prevent the socket from expanding when either the U-shaped grounding prong or the tubular grounding prong is inserted.

Leong, R.

1993-06-22T23:59:59.000Z

253

THURSDAY: Deputy Secretary of Energy to Visit Western Area Power...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

THURSDAY: Deputy Secretary of Energy to Visit Western Area Power Administration Transmission Substation THURSDAY: Deputy Secretary of Energy to Visit Western Area Power...

254

The economics of carbon sequestration in western Oregon forests.  

E-Print Network [OSTI]

??This study considered regional forest policies for sequestering carbon in existing forests in western Oregon. A model of log markets in western Oregon was employed… (more)

Im, Eun Ho

2007-01-01T23:59:59.000Z

255

Policy Network Approach to Coordinated Disaster Response  

E-Print Network [OSTI]

In this paper, we explore the formation of network relationships among disaster relief agencies during the process of responding to an unexpected event. The relationship is investigated through variables derived from the policy network theory, and four cases from three developed countries such as (i) Hurricane Katrina in the US; (ii) Typhoon Maemi in South Korea; (iii) Kobe; and, (iv) Tohoku Earthquake in Japan that failed to cope with extreme events forms the basis for case study presented here. We argue that structural characteristics of multi-jurisdictional coordination may facilitate or impede in responding to a complex nature of recent disaster. We further highlight the promise of policy network approach in facilitating the development of multi-jurisdictional coordination process which may provide new avenue to improve the communication and coordination of hierarchical command control driven organizations with the local community. Our proposed novel approach in investigating the usefulness of network app...

Kim, Kwang Deok

2013-01-01T23:59:59.000Z

256

Interagency Geothermal Coordinating Council fifth annual report. Final draft  

SciTech Connect (OSTI)

Geothermal energy is the natural heat of the earth, and can be tapped as a clean, safe, economical alternative source of energy. Much of the geothermal energy resource is recoverable with current or near-current technology and could make a significant contribution both to increasing domestic energy supplies and to reducing the US dependence on imported oil. Geothermal energy can be used for electric power production, residential and commercial space heating and cooling, industrial process heat, and agricultural process applications. This report describes the progress for fiscal year 1980 (FY80) of the Federal Geothermal Program. It also summarizes the goals, strategy, and plans which form the basis for the FY81 and FY82 program activities and reflects the recent change in national policy affecting Federal research, development and demonstration programs. The Interagency Geothermal Coordinating Council (IGCC) believes that substantial progress can and will be made in the development of geothermal energy. The IGCC goals are: (1) reduce the institutional barriers so that geothermal projects can be on-line in one-half the current time; (2) make moderate temperature resources an economically competitive source of electricity; (3) remove the backlog of noncompetitive lease applications; (4) competitive lease all KGRA lands; and (5) cut the cost of hydrothermal technology by 25%.

Abel, Fred H.

1981-07-07T23:59:59.000Z

257

DOE-TSPP-06; Coordination of DOE Technical Standard  

Broader source: Energy.gov (indexed) [DOE]

5 2.1.6 Coordination of Technical Qualification Standards and Information Architecture Standards......

258

Electrical Equipment Inspection Program Electrical Safety  

E-Print Network [OSTI]

Electrical Equipment Inspection Program Electrical Safety SLAC-I-730-0A11A-001-R003 23 March 2005 Document Title: Electrical Equipment Inspection Program Original Publication Date: 19 January 2005 Revised Publication Date: 23 March 2005 (updated 29 November 2010) Department: Electrical Safety Document Number: SLAC

Wechsler, Risa H.

259

High-resolution modeling of the western North American power system demonstrates low-cost and low-carbon futures  

E-Print Network [OSTI]

High-resolution modeling of the western North American power system demonstrates low-cost and low energy Carbon emissions a b s t r a c t Decarbonizing electricity production is central to reducing of resource cost scenarios, most coal power plants would be replaced by solar, wind, gas, and/or nuclear

Kammen, Daniel M.

260

Coordination of Energy Efficiency and Demand Response  

E-Print Network [OSTI]

and D. Kathan (2009). Demand Response in U.S. ElectricityEnergy Financial Group. Demand Response Research Center [2008). Assessment of Demand Response and Advanced Metering.

Goldman, Charles

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Coordinate Systems in One and Two Dimensions  

E-Print Network [OSTI]

joining these two points makes* with a given line,-. A broader definition is given by Fischer** when he defines coordinates as numbers which determine single"" valuedly the position of a geometric element,and which are,vice versa^determined single... valuedly by such positionjWith the furth- VaYieCtiOK er property that the continuousAof the coordinates^or of the pos- ition of the element causes a cprresponding variation in the oth- er.Still more comprehensive definitions are given by a S c o t t ^ w h...

Wood, Frank Edwin

1914-06-01T23:59:59.000Z

262

EIS-0182: Western Area Power Administration Energy Planning and Management Program  

Broader source: Energy.gov [DOE]

The Western Area Power Administration (WAPA) prepared this environmental impact statement to analyze the environmental impacts of its proposal to establish an Energy Planning and Management Program to replace its Guidelines and Acceptance Criteria for the Conservation and Renewable Energy Program and to evaluate ways to make future resource commitments to existing customers. If adopted, the proposed management program would require WAPA's long-term firm customers to implement long-term energy planning to help enhance efficient electric energy use.

263

Abstract--The electric power system has become a very complicated network at present because of re-structuring and  

E-Print Network [OSTI]

coordination, voltage stability control, reactive power control, electricity market pricing etc1 Abstract--The electric power system has become a very complicated network at present because electric power system has become a very complicated network at present because of restructuring

Lai, Hong-jian

264

The Western Wind and Solar Integration Study Phase 2  

SciTech Connect (OSTI)

The electric grid is a highly complex, interconnected machine, and changing one part of the grid can have consequences elsewhere. Adding wind and solar affects the operation of the other power plants and adding high penetrations can induce cycling of fossil-fueled generators. Cycling leads to wear-and-tear costs and changes in emissions. Phase 2 of the Western Wind and Solar Integration Study (WWSIS-2) evaluated these costs and emissions and simulated grid operations for a year to investigate the detailed impact of wind and solar on the fossil-fueled fleet. This built on Phase 1, one of the largest wind and solar integration studies ever conducted, which examined operational impacts of high wind and solar penetrations in the West.

Lew, D.; Brinkman, G.; Ibanez, E.; Hodge, B. M.; Hummon, M.; Florita, A.; Heaney, M.

2013-09-01T23:59:59.000Z

265

Western Wind and Solar Integration Study Phase 2 (Presentation)  

SciTech Connect (OSTI)

This presentation accompanies Phase 2 of the Western Wind and Solar Integration Study, a follow-on to Phase 1, which examined the operational impacts of high penetrations of variable renewable generation on the electric power system in the West and was one of the largest variable generation studies to date. High penetrations of variable generation can induce cycling of fossil-fueled generators. Cycling leads to wear-and-tear costs and changes in emissions. Phase 2 calculated these costs and emissions, and simulated grid operations for a year to investigate the detailed impact of variable generation on the fossil-fueled fleet. The presentation highlights the scope of the study and results.

Lew, D.; Brinkman, G.; Ibanez, E.; Kumar, N.; Lefton, S.; Jordan, G.; Venkataraman, S.; King, J.

2013-06-01T23:59:59.000Z

266

Competitive interstate taxation of western coal  

SciTech Connect (OSTI)

This paper analyzes the potential market power of western states in setting coal severance taxes. An attempt to determine the emphasis placed by the western states on the development of their coal resources is also made. Three market structures are analyzed. One involves a western regional cartel, setting taxes collectively. The other cases are noncooperative tax equilibria with Montana and Wyoming competing against each other. We study the effects on these equilibria of changes in each region's relative emphasis on development of coal resources vs tax revenue. The welfare impacts of these tax setting policies are also addressed. The analysis is based on an activity analysis of US coal markets. The results show that the taxes associated with the noncooperative competitive tax equilibria are close to present tax levels. Additionally, we conclude that western states currently are quite efficient extractors of economic rent from coal produced within their boundaries, in terms of welfare loss per dollar of tax revenue collected. 2 figures.

Kolstad, C.D.; Wolak, F.A. Jr.

1983-01-01T23:59:59.000Z

267

Boom & Bust in Power Plant Construction: Lessons from the California Electricity Crisis  

E-Print Network [OSTI]

1 Boom & Bust in Power Plant Construction: Lessons from the California Electricity Crisis To Appear in the previous year, and natural gas prices fell dramatically. New power plants came on line, and many more how boom and bust might appear in the western electricity system using computer simulation

Ford, Andrew

268

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

SUBJECT: WECC Reorganization The Western Electricity Coordinating Council (WECC) is one of nine regional electric reliability councils. The WECC region encompasses the entire Western Interconnection, including (FERC) issued a joint report identifying deficiencies in WECC's management of its reliability

269

Western States Geothermal Company | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:SeadovCooperative Jump to: navigation,Western Cooling EfficiencyWestern Springs is

270

MARY H. SAUNDERS Director, Standards Coordination Office  

E-Print Network [OSTI]

Office, NIST. In this capacity, she represents NIST and its significant interests in the standards.S. and world markets by coordinating Commerce Department strategies, policies and programs with U.S. industries Services Division. In that capacity, she administered a range of standards-related programs to provide

271

Coordinated Management: Power, Performance, Energy, and Temperature  

E-Print Network [OSTI]

Coordinated Management: Power, Performance, Energy, and Temperature Heather Hanson Stephen W and energy lim- its" and enable a coherent set of management mechanisms to achieve the goal. The closed at Austin IBM Technical Contact : Rob Bell, Jr. Abstract We are developing a next-generation power manager

Keckler, Stephen W.

272

Coordinating and Motivating open source contributors  

E-Print Network [OSTI]

Coordinating and Motivating open source contributors Workshop @ LinuxWorldAsia James Howison School Science at University of New South Wales 4th year of my PhD at Syracuse University Prof. Crowston Interviews, surveys and studies of development archives ApacheCon, O'Reilly OSCon, FOOCamp, OSDC

Crowston, Kevin

273

Molecular Coordination of Hierarchical Self-Assembly  

E-Print Network [OSTI]

Molecular Coordination of Hierarchical Self-Assembly Technical Report UT-CS-10-662 Bruce J. Mac to self-assemble into multiscale complex hierarchical systems. Keywords: algorithmic assembly, embodied, nano communication, nanofabrication, nanotechnology, Moore's Law, self-assembly, self-organization. 1

MacLennan, Bruce

274

Modeling Resources for Activity Coordination and Scheduling  

E-Print Network [OSTI]

Modeling Resources for Activity Coordination and Scheduling Rodion M. Podorozhny , Barbara Staudt describes experience in applying a resource man- agement system to problems in two areas of agent and activity coordi- nation. In the paper we argue that precise speci cation of resources is important

Massachusetts at Amherst, University of

275

Modeling Resources for Activity Coordination and Scheduling  

E-Print Network [OSTI]

Modeling Resources for Activity Coordination and Scheduling Rodion M. Podorozhny , Barbara Staudt describes experience in applying a resource man­ agement system to problems in two areas of agent and activity coordi­ nation. In the paper we argue that precise specification of resources is important

Massachusetts at Amherst, University of

276

Southern Region Water Quality Coordination Project  

E-Print Network [OSTI]

an existing collaborative process through which new and existing technologies and management systems Committee (SRWQPC) promotes the development and delivery of effective management systems that can be adaptedSouthern Region Water Quality Coordination Project September 14, 2004 to June 1, 2005 Progress

277

Position Description Website and Video Coordinator  

E-Print Network [OSTI]

, feature content that supports the School's mission and employs best practices (i.e. chunking content, short pages, bulleted list, etc.); follow best practices with search engine optimization; creating clearPosition Description Website and Video Coordinator School of Global Environmental Sustainability

Barnes, Elizabeth A.

278

Relativistic derivations of the electric and magnetic fields generated by an electric point charge moving with constant velocity  

E-Print Network [OSTI]

We propose a simple relativistic derivation of the electric and the magnetic fields generated by an electric point charge moving with constant velocity. Our approach is based on the radar detection of the point space coordinates where the fields are measured. The same equations were previously derived in a relatively complicated way2 based exclusively on general electromagnetic field equations and without making use of retarded potentials or relativistic equations

Bernhard Rothenstein; Stefan Popescu; George J. Spix

2006-01-05T23:59:59.000Z

279

NREL Variability Analysis for the Western Interconnect (Presentation)  

SciTech Connect (OSTI)

This presentation investigates the effects of several Energy Imbalance Markets implementations in the Western Interconnect.

Milligan, M.; Kirby, B.; King, J.

2011-07-01T23:59:59.000Z

280

The Siwaliks of western Nepal I. Geometry and kinematics  

E-Print Network [OSTI]

The Siwaliks of western Nepal I. Geometry and kinematics J.L. Mugniera, *, P. Leturmya , G. Masclea-western Nepal, and beneath 14.6 Ma sediments in mid-western Nepal, i.e., above the base of the Siwalik Group. Unconformities have been observed in the upper Siwalik member of western Nepal both on satellite images

Husson, Laurent

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Jones Electric Moho Page 1 ImagingandobservingtheElectricalMoho  

E-Print Network [OSTI]

Jones Electric Moho Page 1 ImagingandobservingtheElectricalMoho Alan G. Jones Dublin Institute version: 18 July, 2012 Revised version: 06 February 2013 Keywords: Moho, electrical Moho, electrical conductivity, electrical resistivity, crustmantle boundary #12;Jones Electric Moho Page 2 Abstract

Jones, Alan G.

282

Flathead River Focus Watershed Coordinator, 2005-2006 Annual Report.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has long been involved with funding of the Cooperative Habitat Protection and Improvement with Private Landowners program in accordance with the Northwest Power Planning Council's (NPPC) Fish & Wildlife Program (Section 7.7). Section 7.7B.1 requires the establishment of ''at least one model watershed coordinator selected by each representative state''. This project was initiated in 1997 with the purpose of fulfilling the NWPCC's watershed program within the Flathead River basin in western Montana. Currently, the Flathead watershed has been radically altered by hydropower and other land uses. With the construction of Hungry Horse, Bigfork and Kerr dams, the Flathead River system has been divided into isolated populations. Bull trout have been listed as threatened by the US Fish and Wildlife Service and westslope cutthroat trout have been petitioned for listing. Many streams in the drainage have been destabilized during recent decades. Past legal and illegal species introductions are also causing problems. This project fosters in-kind, out-of-place mitigation to offset the impacts of hydroelectric power to 72 miles of the South Fork of the Flathead River and its tributaries upstream of Hungry Horse Dam. Key subbasins within the Flathead drainage, which are critical to native species restoration, are experiencing rapid changes in land ownership and management direction. Subdivision and residential development of agricultural and timber lands adjacent to waterways in the drainage pose one of the greatest threats to weak but recoverable stocks of trout species. Plum Creek Timber Company, a major landholder in the Flathead drainage is currently divesting itself of large tracks of its lakeshore and streamside holdings. Growth of small tract development throughout the area and its tributaries is occurring at a record rate. Immediate to short-term action is required to protect stream corridors through many of these areas if cost-effective recovery efforts are to be implemented. In order to adequately address the issues, other segments of society and other (non-BPA) funding sources must be incorporated into the solution. As stated in the 1994 Fish and Wildlife Program (section 7.7), ''Comprehensive watershed management should enhance and expedite implementation of actions by clearly identifying gaps in programs and knowledge, by striving over time to resolve conflicts, and by keying on activities that address priorities''. A watershed coordinator helps to initiate and facilitate efforts for addressing the issues mentioned above and pulling together a plan for mitigation. Local support is essential before local governments and individual citizens are going to allow government initiatives to be implemented.

DuCharme, Lynn (Confederated Salish and Kootenai Tribes of the Flathead Nation, Pablo, MT)

2006-05-01T23:59:59.000Z

283

Flathead River Focus Watershed Coordinator, 2002 Annual Report.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has long been involved with funding of the Cooperative Habitat Protection and Improvement with Private Landowners program in accordance with the Northwest Power Planning Council's (NPPC) Fish & Wildlife Program (Section 7.7). Section 7.7B.1 requires the establishment of ''at least one model watershed coordinator selected by each representative state''. This project was initiated in 1997 with the purpose of fulfilling the NPPC's watershed program within the Flathead River basin in western Montana. Currently, the Flathead watershed has been radically altered by hydropower and other land uses. With the construction of Hungry Horse, Bigfork and Kerr dams, the Flathead River system has been divided into isolated populations. Bull trout have been listed as threatened by the US Fish and Wildlife Service and westslope cutthroat trout have been petitioned for listing. Many streams in the drainage have been destabilized during recent decades. Past legal and illegal species introductions are also causing problems. This project fosters in-kind, out-of-place mitigation to offset the impacts of hydroelectric power to 72 miles of the South Fork of the Flathead River and its tributaries upstream of Hungry Horse Dam. Key subbasins within the Flathead drainage, which are critical to native species restoration, are experiencing rapid changes in land ownership and management direction. Subdivision and residential development of agricultural and timber lands adjacent to waterways in the drainage pose one of the greatest threats to weak but recoverable stocks of trout species. Plum Creek Timber Company, a major landholder in the Flathead drainage is currently divesting itself of large tracks of its lakeshore and streamside holdings. Growth of small tract development throughout the area and its tributaries is occurring at a record rate. Immediate to short-term action is required to protect stream corridors through many of these areas if cost-effective recovery efforts are to be implemented. In order to adequately address the issues, other segments of society and other (non-BPA) funding sources must be incorporated into the solution. As stated in the 1994 Fish and Wildlife Program (section 7.7), ''Comprehensive watershed management should enhance and expedite implementation of actions by clearly identifying gaps in programs and knowledge, by striving over time to resolve conflicts, and by keying on activities that address priorities''. A watershed coordinator helps to initiate and facilitate efforts for addressing the issues mentioned above and pulling together a plan for mitigation. Local support is essential before local governments and individual citizens are going to allow government initiatives to be implemented.

DuCharme, Lynn (Confederated Salish and Kootenai Tribes of the Flathead Nation, Pablo, MT)

2003-04-01T23:59:59.000Z

284

Flathead River Focus Watershed Coordinator, 2004-2005 Annual Report.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has long been involved with funding of the Cooperative Habitat Protection and Improvement with Private Landowners program in accordance with the Northwest Power Planning Council's (NPPC) Fish & Wildlife Program (Section 7.7). Section 7.7B.1 requires the establishment of ''at least one model watershed coordinator selected by each representative state''. This project was initiated in 1997 with the purpose of fulfilling the NWPCC's watershed program within the Flathead River basin in western Montana. Currently, the Flathead watershed has been radically altered by hydropower and other land uses. With the construction of Hungry Horse, Bigfork and Kerr dams, the Flathead River system has been divided into isolated populations. Bull trout have been listed as threatened by the US Fish and Wildlife Service and westslope cutthroat trout have been petitioned for listing. Many streams in the drainage have been destabilized during recent decades. Past legal and illegal species introductions are also causing problems. This project fosters in-kind, out-of-place mitigation to offset the impacts of hydroelectric power to 72 miles of the South Fork of the Flathead River and its tributaries upstream of Hungry Horse Dam. Key subbasins within the Flathead drainage, which are critical to native species restoration, are experiencing rapid changes in land ownership and management direction. Subdivision and residential development of agricultural and timber lands adjacent to waterways in the drainage pose one of the greatest threats to weak but recoverable stocks of trout species. Plum Creek Timber Company, a major landholder in the Flathead drainage is currently divesting itself of large tracks of its lakeshore and streamside holdings. Growth of small tract development throughout the area and its tributaries is occurring at a record rate. Immediate to short-term action is required to protect stream corridors through many of these areas if cost-effective recovery efforts are to be implemented. In order to adequately address the issues, other segments of society and other (non-BPA) funding sources must be incorporated into the solution. As stated in the 1994 Fish and Wildlife Program (section 7.7), ''Comprehensive watershed management should enhance and expedite implementation of actions by clearly identifying gaps in programs and knowledge, by striving over time to resolve conflicts, and by keying on activities that address priorities''. A watershed coordinator helps to initiate and facilitate efforts for addressing the issues mentioned above and pulling together a plan for mitigation. Local support is essential before local governments and individual citizens are going to allow government initiatives to be implemented.

DuCharme, Lynn (Confederated Salish and Kootenai Tribes of the Flathead Nation, Pablo, MT)

2006-06-26T23:59:59.000Z

285

Flathead River Focus Watershed Coordinator, 2003-2004 Annual Report.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has long been involved with funding of the Cooperative Habitat Protection and Improvement with Private Landowners program in accordance with the Northwest Power Planning Council's (NPPC) Fish & Wildlife Program (Section 7.7). Section 7.7B.1 requires the establishment of ''at least one model watershed coordinator selected by each representative state''. This project was initiated in 1997 with the purpose of fulfilling the NWPCC's watershed program within the Flathead River basin in western Montana. Currently, the Flathead watershed has been radically altered by hydropower and other land uses. With the construction of Hungry Horse, Bigfork and Kerr dams, the Flathead River system has been divided into isolated populations. Bull trout have been listed as threatened by the US Fish and Wildlife Service and westslope cutthroat trout have been petitioned for listing. Many streams in the drainage have been destabilized during recent decades. Past legal and illegal species introductions are also causing problems. This project fosters in-kind, out-of-place mitigation to offset the impacts of hydroelectric power to 72 miles of the South Fork of the Flathead River and its tributaries upstream of Hungry Horse Dam. Key subbasins within the Flathead drainage, which are critical to native species restoration, are experiencing rapid changes in land ownership and management direction. Subdivision and residential development of agricultural and timber lands adjacent to waterways in the drainage pose one of the greatest threats to weak but recoverable stocks of trout species. Plum Creek Timber Company, a major landholder in the Flathead drainage is currently divesting itself of large tracks of its lakeshore and streamside holdings. Growth of small tract development throughout the area and its tributaries is occurring at a record rate. Immediate to short-term action is required to protect stream corridors through many of these areas if cost-effective recovery efforts are to be implemented. In order to adequately address the issues, other segments of society and other (non-BPA) funding sources must be incorporated into the solution. As stated in the 1994 Fish and Wildlife Program (section 7.7), ''Comprehensive watershed management should enhance and expedite implementation of actions by clearly identifying gaps in programs and knowledge, by striving over time to resolve conflicts, and by keying on activities that address priorities''. A watershed coordinator helps to initiate and facilitate efforts for addressing the issues mentioned above and pulling together a plan for mitigation. Local support is essential before local governments and individual citizens are going to allow government initiatives to be implemented.

DuCharme, Lynn (Confederated Salish and Kootenai Tribes of the Flathead Nation, Pablo, MT)

2004-06-01T23:59:59.000Z

286

The synthesis and characterization of new iron coordination complexes utilizing an asymmetric coordinating chelate ligand  

SciTech Connect (OSTI)

A binuclear, unsymmetric coordinating ligand that is an effective metal chelator has been designed and synthesized. The new ligand has been shown to react readily with iron(II)/(III) forming a variety of coordination complexes. The binuclear complexes are of significant interest since they represent proof-of-principle for the development of coordinatively asymmetric, binuclear metal chelate compounds. Although this structural type of chelator now appears to be common in biological systems, it has not been previously described for inorganic coordination chemistry. The isolation of oxidation products will be helpful in establishing reaction mechanism(s) of these complexes with molecular oxygen. It is expected that this ligand and derivatives of it will play an important role in the development of bioinorganic complexes that aim to mimic enzyme active sites that function by substrate interaction at only one metal site of a multimetal active site.

Watkins, B.E.; Satcher, J.H.

1995-07-01T23:59:59.000Z

287

University of Strathclyde Dpt of Electric Electrical Engineering...  

Open Energy Info (EERE)

Strathclyde Dpt of Electric Electrical Engineering Institute for Energy and Enviro Jump to: navigation, search Name: University of Strathclyde, Dpt of Electric & Electrical...

288

Estimating the Value of Electricity Storage Resources in Electricity...  

Broader source: Energy.gov (indexed) [DOE]

Estimating the Value of Electricity Storage Resources in Electricity Markets - EAC 2011 Estimating the Value of Electricity Storage Resources in Electricity Markets - EAC 2011 The...

289

Electrical Generation for More-Electric Aircraft using Solid...  

Broader source: Energy.gov (indexed) [DOE]

Electrical Generation for More-Electric Aircraft using Solid Oxide Fuel Cells Electrical Generation for More-Electric Aircraft using Solid Oxide Fuel Cells This study, completed by...

290

Southeastern Electric- Electric Equipment Loan Program  

Broader source: Energy.gov [DOE]

Southeastern Electric Cooperative is a member-owned electric cooperative that serves customers in the southeastern part of South Dakota. Southeastern offers a loan program for customers who want...

291

Electric Vehicle Research Group  

E-Print Network [OSTI]

.................................................................................9 From diesel to electric: a new era in personnel transport for underground coal minesElectric Vehicle Research Group Annual Report 2012 #12;Table of Contents Executive Summary................................................................................8 C2-25 Electric Vehicle Drivetrain

Liley, David

292

Electric car Gasoline car  

E-Print Network [OSTI]

ENAC/ Electric car (Renault) Gasoline car (competitors) Gasoline car (Renault) Market shares of an electric vehicle? Electric car (Renault) Gasoline car (competitors) Gasoline car (Renault) Market shares preference survey with choice situation contexts involving gasoline cars (Renault and competitors

293

Velocity coordinate spectrum: geometrical aspects of observations  

E-Print Network [OSTI]

We analyze a technique of obtaining turbulence power spectrum using spectral line data along the velocity coordinate, which we refer to as Velocity Coordinate Spectrum (VCS). We formalize geometrical aspects of observation through a single factor, "geometric term". We find that all variety of particular observational configurations can be described using correspondent variants of this term, which we explicitly calculate. This allows us to obtain asymptotics for both parallel lines of sight and crossing lines of sight. The latter case is especially important for studies of turbulence within diffuse ISM in Milky Way. For verification of our results, we use direct calculation of VCS spectra, while the numerical simulations are presented in a companion paper.

A. Chepurnov; A. Lazarian

2007-01-31T23:59:59.000Z

294

ELECTRICAL ENERGY SYSTEMS ELECTRICAL ENERGY SYSTEMS  

E-Print Network [OSTI]

countries to install solar energy technologies into local schools and hospitals. In its Energy PolicyMEng ELECTRICAL ENERGY SYSTEMS #12;MEng ELECTRICAL ENERGY SYSTEMS Electrical energy is vital aspects of modern life. One of the biggest challenges facing society is the need for reliable energy

Strathclyde, University of

295

DOE handbook electrical safety  

SciTech Connect (OSTI)

Electrical Safety Handbook presents the Department of Energy (DOE) safety standards for DOE field offices or facilities involved in the use of electrical energy. It has been prepared to provide a uniform set of electrical safety guidance and information for DOE installations to effect a reduction or elimination of risks associated with the use of electrical energy. The objectives of this handbook are to enhance electrical safety awareness and mitigate electrical hazards to employees, the public, and the environment.

NONE

1998-01-01T23:59:59.000Z

296

Electrical safety guidelines  

SciTech Connect (OSTI)

The Electrical Safety Guidelines prescribes the DOE safety standards for DOE field offices or facilities involved in the use of electrical energy. It has been prepared to provide a uniform set of electrical safety standards and guidance for DOE installations in order to affect a reduction or elimination of risks associated with the use of electrical energy. The objectives of these guidelines are to enhance electrical safety awareness and mitigate electrical hazards to employees, the public, and the environment.

Not Available

1993-09-01T23:59:59.000Z

297

2012 Annual Report [WESTERN AREA POWER ADMINISTRATION  

SciTech Connect (OSTI)

Fiscal Year 2012 brought some tumultuous and uncertain times to Western. The utility industry and technology continued to evolve, and the demand for constant flow of power and transmission system reliability continued to increase. Western kept pace by continuing to deliver reliable, cost-based hydropower while reviewing and updating business practices that took into account how the energy industry is evolving. During this time of exponential change, Western tackled many challenges, including: Reviewing the Transmission Infrastructure Program processes and procedures; Responding to Secretary of Energy Steven Chu’s memorandum to create a modern, efficient and reliable transmission grid; Weathering record-breaking natural disasters in our service territory; Completing our role in TIP’s flagship project—the Montana Alberta Tie Ltd. transmission line; Incorporating new, far-reaching regulations and industry trends.

none,

2012-01-01T23:59:59.000Z

298

California's electricity crisis  

E-Print Network [OSTI]

The collapse of California's electricity restructuring and competition program has attracted attention around the world. Prices in California's competitive wholesale electricity market increased by 500% between the second ...

Joskow, Paul L.

2001-01-01T23:59:59.000Z

299

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

marketers to compete to serve customers and these competitive retail suppliers offer electricity at a market-based price. EIA does not directly collect retail electricity...

300

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Update is prepared by the Electric Power Operations Team, Office of Electricity, Renewables and Uranium Statistics, U.S. Energy Information Administration (EIA), U.S....

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

ELECTRICAL & COMPUTER ENGINEERING  

E-Print Network [OSTI]

ELECTRICAL & COMPUTER ENGINEERING SEMINAR "Towards Numerical Growth Model for Laser Damage is a senior member of IEEE (the Institute of Electrical and Electronics Engineers), member of SPIE

302

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

See all Electricity Reports Electricity Monthly Update With Data for September 2014 | Release Date: Nov. 25, 2014 | Next Release Date: Dec. 23, 2014 Previous Issues Issue:...

303

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

See all Electricity Reports Electricity Monthly Update With Data for October 2014 | Release Date: Dec. 23, 2014 | Next Release Date: Jan. 26, 2015 Previous Issues Issue:...

304

Edison Electric Institute Update  

Broader source: Energy.gov [DOE]

Presentation—given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting—discusses the Edison Electric Institute (EEI) and the current electricity landscape.

305

Guidance Based Collision Avoidance of Coordinated Nonholonomic Autonomous Vehicles  

E-Print Network [OSTI]

Guidance Based Collision Avoidance of Coordinated Nonholonomic Autonomous Vehicles Xianbo Xiang following control, obstacle avoidance and collision free for coordinated multiple nonholonomic autonomous autonomous ve- hicles dealing with tasks could offer additional advantages, in terms of flexibility

Paris-Sud XI, Université de

306

Coordinated Searching and Target Identification Using Teams of Autonomous Agents  

E-Print Network [OSTI]

Coordinated Searching and Target Identification Using Teams of Autonomous Agents Christopher Lum;#12;University of Washington Abstract Coordinated Searching and Target Identification Using Teams of Autonomous & Astronautics Many modern autonomous systems actually require significant human involvement. Often, the amount

Washington at Seattle, University of

307

Fiscal policy coordination in times of economic and financial crises   

E-Print Network [OSTI]

This thesis examines fiscal policy coordination in the EU during the Great Recession (2008-2010). For the first time since the Maastricht Treaty heralded the coordination of macroeconomic policies among EU Member States, ...

Rommerskirchen, Charlotte Sophie

2014-07-01T23:59:59.000Z

308

Localization and Coordination in Decentralized Multi-Robot Systems  

E-Print Network [OSTI]

Localization and Coordination in Decentralized Multi-Robot Systems Patricia Kristine Sheridan Supervisor: Professor B. Benhabib Department of Mechanical and Industrial Engineering University of Toronto March, 2009 #12;Localization and Coordination in Decentralized Multi-Robot Systems ABSTRACT

Sun, Yu

309

automated optimal coordination: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

16 17 18 19 20 21 22 23 24 25 Next Page Last Page Topic Index 1 Pathwise coordinate optimization CiteSeer Summary: We consider one-at-a-time coordinate-wise descent algorithms...

310

The Lower Rio Grande Valley Regional Public Transportation Coordination Plan  

E-Print Network [OSTI]

KFH GROUP, INC. THE LOWER RIO GRANDE VALLEY REGIONAL PUBLIC TRANSPORTATION COORDINATION PLAN Developed for: Lower Rio Grande Valley Regional Transportation Coordination Plan Committee By: KFH Group, Incorporated... Page BACKGROUND..............................................................................................................................1 PLAN PROCESS...

Lower Rio Grande Valley Development Council

2006-11-30T23:59:59.000Z

311

areas joint coordinating: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

resolution; support of analytical modelling; and description of the organizational environment. Keywords : coordination; group decision support; collaborative office processes;...

312

Coordinating Pediatric Medical Care during an Influenza Pandemic - Hospital Workbook  

SciTech Connect (OSTI)

This workbook is intended to assist hospitals with coordinating medical care for pediatric influenza-like illness across their community.

HCTT CHE

2010-01-01T23:59:59.000Z

313

SME dependence and coordination in innovation networks RESEARCH PAPER  

E-Print Network [OSTI]

SME dependence and coordination in innovation networks RESEARCH PAPER Elodie Gardet elodie and characterize the coordination systems used by SME hub firms that are in a situation of dependence with respect of the adequate coordination mechanims is central for a SME hub firm and the success of the innovation project

Boyer, Edmond

314

Coordinated Output Regulation of Multiple Heterogeneous Linear Systems  

E-Print Network [OSTI]

, the generalizations of coordination of multiple linear dynamic systems to the cooperative output regulation problemCoordinated Output Regulation of Multiple Heterogeneous Linear Systems Ziyang Meng, Tao Yang, Dimos V. Dimarogonas, and Karl H. Johansson Abstract-- The coordinated output regulation problem

Dimarogonas, Dimos

315

ENVS 404: Internship Syllabus Contact Information: Internship Coordinator  

E-Print Network [OSTI]

1 ENVS 404: Internship Syllabus Contact Information: Internship Coordinator Peg Boulay Environmental Leadership Program Co-Director, Internship Coordinator and Academic Adviser 242 Columbia Hall 541-346-5945 boulay@uoregon.edu Note: The Internship Coordinator position may also be filled by a Graduate Teaching

316

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

SciTech Connect (OSTI)

The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this paper we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33percent of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33percent RE target across nearly all scenarios analyzed (38-65percent). Solar energy is almost always the second largest source (14-41percent). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Further, we find that even with total transmission expenditures of $17-34 billion these costs still represent just 10-19percent of the total delivered cost of renewable energy.

Mills, Andrew D.; Phadke, Amol A.; Wiser, Ryan H.

2010-06-10T23:59:59.000Z

317

Case Western Reserve University Chart of Accounts  

E-Print Network [OSTI]

of the following: ANN LON CIP OPR CSR OSA END PLT FHB RES INC SPC INS TRN All other SpeedTypes will populate 102330 Non-Govt Construction 102340 Non-Govt CIP Movable Equipment 102350 Govt Construction 102360 Govt CIP Movable Equip 102370 CIP - Site Preparation 102371 CIP Surveying #12;Case Western Reserve

Rollins, Andrew M.

318

Northern and Western Minnesota and NW Wisconsin  

E-Print Network [OSTI]

Super Haul Corridors g)! Western Truck Route h)! Lancaster Border Crossing i)! Designated Truck Network factors. 6. Super Haul Truck Corridors Conduct an analysis of best the best routes for moving heavy Commission d)! Intermodal Improvements at Dilworth e)! Truck Size and Weight Harmonization f)! Designated

Minnesota, University of

319

Regional Summary Western Pacific Management Context  

E-Print Network [OSTI]

-central and eastern Pacific Ocean) total of Pacific bigeye tuna landings reported in 2009. Currently (WCPFC) is active in the western and central Pacific Ocean and the Inter-American Tropical Tuna Commission (IATTC) is active in the eastern Pacific Ocean. Species under the purview of the WCPFC and IATTC

320

Mass Wasting in the Western Galapagos Islands  

E-Print Network [OSTI]

the Hawaiian Islands, the western Galapagos Islands appear to be characterized by small slump sheets existing along the steep shallow submarine flanks of the island and by debris flows that are flanked by rift zones and extend off the platform. This study...

Hall, Hillary

2012-10-19T23:59:59.000Z

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Lots of wonderful Vendors! Western Art  

E-Print Network [OSTI]

Fresh Market Indiantown Lots of wonderful Vendors! · Western Art · Quail Eggs & Honey · Canning, Nov. 30 Seminole Inn Buy Locally Grown Produce and Arts & Crafts Vendors may contact ( 772) 597 Indiantown Fresh Market at the Seminole Inn · 11am - 3pm VENDOR APPLICATION Last Sunday of the Month Request

Watson, Craig A.

322

ANNUAL REPORT WESTERN COOLING EFFICIENCY CENTER  

E-Print Network [OSTI]

Sinks for Unitary Air Conditioners 10 Graywater Reuse for Evaporative Cooling 14 In-Home Energy Display COOLING EFFICIENCY CENTER WESTERN COOLING EFFICIENCY CENTER EXPLORING MANY OPTIONS FOR ENERGY EFFICIENCY and leadership in the field of energy efficiency. This document, the second Annual Report on Cooling in the West

California at Davis, University of

323

QER- Comment of Western Environmental Law Center  

Broader source: Energy.gov [DOE]

To whom it may concern, I provided the following comments at the public meeting in Santa Fe, NM on 8/11/14: My name is Thomas Singer, and I am a Senior Policy Advisor at the Western Environmental Law Center.

324

First Western Forum on Energy & Water Sustainability  

E-Print Network [OSTI]

First Western Forum on Energy & Water Sustainability March 22, 2007 WATER PLAN: 2000-2050 CITY;Tucson Active Management Area Tucson Active Management Area City of Tucson Tucson Active Management Area-2000 Tucson Active Management Area #12;City of Tucson 1940 #12;City of Tucson 1945 #12;City of Tucson 1950 #12

Keller, Arturo A.

325

WWU Sustainability Academy Western Washington University  

E-Print Network [OSTI]

WWU Sustainability Academy Western Washington University Dear colleagues, We cordially extend to you this invitation to join the WWU Sustainability Academy! Following several years of discussion, a group of faculty has started the (tentatively named) "WWU Sustainability Academy." Our goal is to build

Zaferatos, Nicholas C.

326

Fracking in western Maryland Johan Schijf  

E-Print Network [OSTI]

Fracking in western Maryland Johan Schijf Chesapeake Biological Laboratory University of Maryland Center for Environmental Science #12;This seminar will consist of three parts: I. What is fracking and gas #12;What is the difference between conventional gas drilling and fracking? In many places natural

Boynton, Walter R.

327

Colorado Highlands Wind Project, Western's RM Environment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

by adding 11 wind turbine generators (WTGs) on approximately 1,200 acres of State and private land adjoining the eastern border of the existing Project. The electricity...

328

ELECTRICAL AND COMPUTER ENGINEERING  

E-Print Network [OSTI]

Edison (prolific inventor), Nikola Tesla (inventor of the electric motor, transformer), Dilbert (comic

Haykin, Simon

329

Massachusetts Electric Vehicle Efforts  

E-Print Network [OSTI]

Massachusetts Electric Vehicle Efforts Christine Kirby, MassDEP ZE-MAP Meeting October 24, 2014 #12 · Provide Clean Air · Grow the Clean Energy Economy · Electric vehicles are a key part of the solution #12 is promoting EVs 4 #12;TCI and Electric Vehicles · Established the Northeast Electric Vehicle Network through

California at Davis, University of

330

LABORATORY V ELECTRIC CIRCUITS  

E-Print Network [OSTI]

Lab V -1 LABORATORY V ELECTRIC CIRCUITS Electrical devices are the cornerstones of our modern world understanding of them. In the previous laboratory, you studied the behavior of electric fields and their effect on the motion of electrons using a cathode ray tube (CRT). This beam of electrons is one example of an electric

Minnesota, University of

331

Electronics, Electrical Engineering  

E-Print Network [OSTI]

SCHOOL OF Electronics, Electrical Engineering and Computer Science IS IN YOUR HANDS THE FUTURE #12;SCHOOL OF Electronics, Electrical Engineering and Computer Science2 CAREERS IN ELECTRONICS, ELECTRICAL Belfast. Ranked among the top 100 in the world for Electrical and Electronic Engineering (QS World

332

EFCOG / DOE Electrical Safety  

E-Print Network [OSTI]

EFCOG / DOE Electrical Safety Improvement Project Project Area 4 ­Performance Measurement Electrical Severity Measurement Tool Revision 1 April 16, 2007 #12;Electrical Severity Measurement Tool Purpose: This tool is intended to determine the severity of an electrical energy event based

333

Syracuse University Electrical Engineering  

E-Print Network [OSTI]

Syracuse University Electrical Engineering and Computer Science Tenure Track Faculty Position in Electrical Engineering The Department of Electrical Engineering and Computer Science is seeking applicants for a tenure track position in Electrical Engineering starting in August 2014 or January 2015. The department

Mather, Patrick T.

334

Renewable Electricity Futures Study  

E-Print Network [OSTI]

Renewable Electricity Futures Study Exploration of High-Penetration Renewable Electricity Futures PDF Volume 4 PDF #12;Renewable Electricity Futures Study Edited By Hand, M.M. National Renewable Citations Renewable Electricity Futures Study (Entire Report) National Renewable Energy Laboratory. (2012

335

Renewable Electricity Futures Study  

E-Print Network [OSTI]

Renewable Electricity Futures Study End-use Electricity Demand Volume 3 of 4 Volume 2 PDF Volume 3;Renewable Electricity Futures Study Edited By Hand, M.M. National Renewable Energy Laboratory Baldwin, S. U Sandor, D. National Renewable Energy Laboratory Suggested Citations Renewable Electricity Futures Study

336

Renewable Electricity Futures Study  

E-Print Network [OSTI]

Renewable Electricity Futures Study Bulk Electric Power Systems: Operations and Transmission by the Alliance for Sustainable Energy, LLC. #12;Renewable Electricity Futures Study Edited By Hand, M.M. National Suggested Citations Renewable Electricity Futures Study (Entire Report) National Renewable Energy Laboratory

337

Introduction Computational Efficiency Electricity Portfolio Planning Electricity Portfolios  

E-Print Network [OSTI]

Introduction Computational Efficiency Electricity Portfolio Planning Electricity Portfolios 2009/11/30­12/01 István Maros Electricity Portfolio #12;Introduction Computational Efficiency Electricity Portfolio Outline 1 Introduction 2 Computational Efficiency 3 Electricity Portfolio Approximate

338

The coordinate coherent states approach revisited  

SciTech Connect (OSTI)

We revisit the coordinate coherent states approach through two different quantization procedures in the quantum field theory on the noncommutative Minkowski plane. The first procedure, which is based on the normal commutation relation between an annihilation and creation operators, deduces that a point mass can be described by a Gaussian function instead of the usual Dirac delta function. However, we argue this specific quantization by adopting the canonical one (based on the canonical commutation relation between a field and its conjugate momentum) and show that a point mass should still be described by the Dirac delta function, which implies that the concept of point particles is still valid when we deal with the noncommutativity by following the coordinate coherent states approach. In order to investigate the dependence on quantization procedures, we apply the two quantization procedures to the Unruh effect and Hawking radiation and find that they give rise to significantly different results. Under the first quantization procedure, the Unruh temperature and Unruh spectrum are not deformed by noncommutativity, but the Hawking temperature is deformed by noncommutativity while the radiation specturm is untack. However, under the second quantization procedure, the Unruh temperature and Hawking temperature are untack but the both spectra are modified by an effective greybody (deformed) factor. - Highlights: Black-Right-Pointing-Pointer Suggest a canonical quantization in the coordinate coherent states approach. Black-Right-Pointing-Pointer Prove the validity of the concept of point particles. Black-Right-Pointing-Pointer Apply the canonical quantization to the Unruh effect and Hawking radiation. Black-Right-Pointing-Pointer Find no deformations in the Unruh temperature and Hawking temperature. Black-Right-Pointing-Pointer Provide the modified spectra of the Unruh effect and Hawking radiation.

Miao, Yan-Gang, E-mail: miaoyg@nankai.edu.cn; Zhang, Shao-Jun, E-mail: sjzhang@mail.nankai.edu.cn

2013-02-15T23:59:59.000Z

339

Coordinated study of the Devonian black shale in the Illinois Basin: Illinois, Indiana, and western Kentucky. Final report  

SciTech Connect (OSTI)

An evaluation of the resource potential of the Devonian shales, called the Eastern Gas Shales Project (EGSP) was begun. A study of the stratigraphy, structure, composition, and gas content of the Devonian shale in the Illinois Basin was undertaken by the State Geological Surveys of Illinois, Indiana, and Kentucky, under contract to the U.S. DOE as a part of the EGSP. Certain additional data were also developed by other research organizations (including Monsanto Research Corporation-Mound Facility and Battelle-Columbus Laboratory) on cores taken from the Illinois Basin. This report, an overview of geological data on the Illinois basin and interpretations of this data resulting from the EGSP, highlights areas of potential interest as exploration targets for possible natural gas resources in the Devonian shale of the basin. The information in this report was compiled during the EGSP from open file data available at the three State Geological surveys and from new data developed on cores taken by the DOE from the basin specifically for the EGSP. The organically richest shale is found in southeastern Illinois and in most of the Indiana and Kentucky portions of the Illinois Basin. The organic-rich shales in the New Albany are thickest near the center of the basin in southeastern Illinois, southwestern Indiana, and adjacent parts of Kentucky portions of the Illinois Basin. The organic-rich shales in the New Albany are thickest near the center of the basin in southeastern Illinois, southwestern Indiana, and adjacent parts of Kentucky. Natural fractures in the shale may aid in collecting gas from a large volume of shale. These fractures may be more abundant and interconnected to a greater degree in the vicinity of major faults. Major faults along the Rough Creek Lineament and Wabash Valley Fault System cross the deeper part of the basin.

Lineback, J.A.

1980-12-31T23:59:59.000Z

340

An Incident Management Preparedness and Coordination Toolkit  

SciTech Connect (OSTI)

Although the use of Geographic Information Systems (GIS) by centrally-located operations staff is well established in the area of emergency response, utilization by first responders in the field is uneven. Cost, complexity, and connectivity are often the deciding factors preventing wider adoption. For the past several years, Oak Ridge National Laboratory (ORNL) has been developing a mobile GIS solution using free and open-source software targeting the needs of front-line personnel. Termed IMPACT, for Incident Management Preparedness and Coordination Toolkit, this ORNL application can complement existing GIS infrastructure and extend its power and capabilities to responders first on the scene of a natural or man-made disaster.

Koch, Daniel B [ORNL; Payne, Patricia W [ORNL

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

APS Floor Coordinators | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered‰PNGExperience4AJ01) (See95TI07)Operations2AP-XPSAPS Floor Coordinators APS Floor

342

Famennian microbial reef facies, Napier and Oscar Ranges, Canning Basin, western Australia  

E-Print Network [OSTI]

Geol. Rundsch. , Western Australia: Geologic Maps of theof the Canning basin, Western Australia. West. Aust. Geol.the Canning Basin, Western Australia. In: Stromatolites (Ed.

Stephens, N P; Sumner, Dawn Y.

2003-01-01T23:59:59.000Z

343

Late devonian carbon isotope stratigraphy and sea level fluctuations, Canning Basin, Western Australia  

E-Print Network [OSTI]

reef, Canning Basin, Western Australia. Palaeontology 43,the Canning Basin, Western Australia. In: Loucks, R.G. ,Canning Basin, Western Australia. Ph.D Thesis, University of

Stephens, N P; Sumner, Dawn Y.

2003-01-01T23:59:59.000Z

344

ECE 438 Electric and Hybrid Vehicles Catalog Description: History of electric traction. Introduction to electric and hybrid-electric  

E-Print Network [OSTI]

ECE 438 ­ Electric and Hybrid Vehicles Catalog Description: History of electric traction. Introduction to electric and hybrid-electric vehicle configurations. Vehicle mechanics. Energy sources and storage. Range prediction. Motor for HEVs. Electric drive components. Vehicle transmission system. Credits

345

Coolerado 5 Ton RTU Performance: Western Cooling Challenge Results (Revised)  

SciTech Connect (OSTI)

The Western Cooling Efficiency Center (WCEC) developed a set of criteria for test conditions, minimum energy, and water use performance for prototype cooling equipment and identified these conditions as indicative of western state climates.

Kozubal, E.; Slayzak, S.

2010-11-01T23:59:59.000Z

346

arc western pacific: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cane is then modified to investigate the evolution of the western Pacific Wang, Chunzai 54 10A.7 CLUSTER ANALYSIS OF WESTERN NORTH PACIFIC TROPICAL CYCLONE TRACKS Suzana J....

347

VEE-0040- In the Matter of Western Star Propane, Inc.  

Broader source: Energy.gov [DOE]

On February 18, 1997, Western Star Propane, Inc. (Western) filed an Application for Exception with the Office of Hearings and Appeals (OHA) of the Department of Energy (DOE). In its application,...

348

Richmond Electric Vehicle Initiative Electric Vehicle Readiness...  

Office of Environmental Management (EM)

MO) Vehicles Home About Vehicle Technologies Office Plug-in Electric Vehicles & Batteries Fuel Efficiency & Emissions Alternative Fuels Modeling, Testing, Data & Results Education...

349

Multiagent coordination in microgrids via wireless networks  

E-Print Network [OSTI]

The future smart grid is expected to be an integration of intelligent microgrids featured by localized electricity generation, storage, and consumption. Wireless communication is a promising means to facilitate pervasive microgrid monitoring and control at a high flexibility and low deployment cost

Hao Liang; Atef Abdrabou

350

Demand Response Spinning Reserve Demonstration  

E-Print Network [OSTI]

Electric Coordinating Council (WECC); Fred LeBlanc, WesternAdministration (WAPA) and WECC; and Dorris Lam, Californiaon System Stability. WECC system stability is enhanced when

2007-01-01T23:59:59.000Z

351

Cooperation Among Balancing Authorities Offers Greater Use of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

the Variable Generation Subcommittee at the Western Electricity Coordinating Council (WECC) has been investigating the benefits of cooperation between Balancing Authorities (BAs)...

352

DRAFT COMMITTEE REPORT RENEWABLE ENERGY PROGRAM  

E-Print Network [OSTI]

............................................ E-26 APPENDIX F: Consumer Education Program WREGIS Contract Support.......................................................................................................................................F-1 Western Electricity Coordinating CouncilProse ......................................................................................................................................F-2 Other Consumer Education Activities

353

COMMISSION REPORT RENEWABLE ENERGY PROGRAM  

E-Print Network [OSTI]

-11 APPENDIX E: Consumer Education Program WREGIS Contract Support...................................................................................................................................... E-1 Western Electricity Coordinating Council..................................................................................................................................... E-2 Other Consumer Education Activities

354

DRAFT COMMITTEE REPORT RENEWABLE ENERGY PROGRAM  

E-Print Network [OSTI]

-11 APPENDIX E: Consumer Education Program WREGIS Contract Support...................................................................................................................................... E-1 Western Electricity Coordinating Council..................................................................................................................................... E-2 Other Consumer Education Activities

355

Carborane Anions: As Weakly Coordinating Counterions and Coordinating Ligands for Catalyst Design  

E-Print Network [OSTI]

phosphine anion, iPr 2 P(CB 11 Cl 11 ) - .Upon coordinationSpecifically, we targeted iPr 2 P(CB 11 Cl 11 ) ? Li + (2),the dianionic intermediate with iPr 2 PCl afforded 2 in 98 %

Wright, James Henry

2013-01-01T23:59:59.000Z

356

Western Michigan University -Extended University Programs How to Get Started  

E-Print Network [OSTI]

Western Michigan University - Extended University Programs How to Get Started Interested in takingThe first toWestern Michigan University, Office of Admissions,1903W. Michigan Ave,Kalamazoo,MI 49008Western Michigan University,Office of Admissions,1903W.Michigan Ave, Kalamazoo,MI 49008-5211;the other

de Doncker, Elise

357

TERTIARY INSTITUTIONS SERVICE CENTRE (Incorporated in Western Australia)  

E-Print Network [OSTI]

TERTIARY INSTITUTIONS SERVICE CENTRE (Incorporated in Western Australia) 100 Royal Street East Perth, Western Australia 6004 Telephone (08) 9318 8000 Facsimile (08) 9225 7050 http://www.tisc.edu.au/ Curtin University · Edith Cowan University · Murdoch University · The University of Western Australia

358

TERTIARY INSTITUTIONS SERVICE CENTRE (Incorporated in Western Australia)  

E-Print Network [OSTI]

TERTIARY INSTITUTIONS SERVICE CENTRE (Incorporated in Western Australia) Level 1, 100 Royal Street East Perth, Western Australia 6004 Telephone (08) 9318 8000 Facsimile (08) 9225 7050 http://www.tisc.edu.au/ Curtin University · Edith Cowan University · Murdoch University · The University of Western Australia

359

Electric arc saw apparatus  

DOE Patents [OSTI]

A portable, hand held electric arc saw has a small frame for supporting an electrically conducting rotary blade which serves as an electrode for generating an electric arc to erode a workpiece. Electric current is supplied to the blade by biased brushes and a slip ring which are mounted in the frame. A pair of freely movable endless belts in the form of crawler treads stretched between two pulleys are used to facilitate movement of the electric arc saw. The pulleys are formed of dielectric material to electrically insulate the crawler treads from the frame.

Deichelbohrer, Paul R [Richland, WA

1986-01-01T23:59:59.000Z

360

Alfalfa Production Under Irrigation in Western Texas.  

E-Print Network [OSTI]

TEXAS AGRICULTURAL EXPERIMENT STATION A. B. CONNER, DIRECTOR COLLEGE STATION, BRAZOS COUNTY, TEXAS BULLETIN NO. 472 DECEMBER, 1932 -- DIVISION OF AGRONOMY Alfalfa Production Under Irrigation in Western Texas - - AGRICULTURAL AND MECHANICAL..... Animal Husbandry A. L. Darnell, M. A.. Dairy Husbandry *Dean, School of Veterinary Medicine. ?As of December 1,1932. **In cooperation with U. S. Department of Agriculture. f ?On leave. $In cooperation with Texas Extension Service. Alfalfa is one...

Bayles, John J. (John Jasper)

1932-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Western Cooling Efficiency Center | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:SeadovCooperative Jump to: navigation,Western Cooling Efficiency Center Place: Davis, CA

362

Western Ethanol Company LLC | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:SeadovCooperative Jump to: navigation,Western Cooling Efficiency Center Place:

363

Western Geothermal Partners | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:SeadovCooperative Jump to: navigation,Western Cooling Efficiency Center Place:Geothermal

364

Western Resource Advocates | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:SeadovCooperative Jump to: navigation,Western Cooling Efficiency CenterAssociation

365

Economics and Policies for Carbon Capture and Sequestration in the Western United States: A Marginal Cost Analysis of Potential Power Plant Deployment  

E-Print Network [OSTI]

capital costs. Capacity factors and the impact of carbon prices vary considerably by plant location: A Marginal Cost Analysis of Potential Power Plant Deployment by Gary Shu B.S., Electrical Engineering;Economics and Policies for Carbon Capture and Sequestration in the Western United States: A Marginal Cost

366

Distributed Sensor Coordination for Advanced Energy Systems  

SciTech Connect (OSTI)

The ability to collect key system level information is critical to the safe, efficient and reli- able operation of advanced energy systems. With recent advances in sensor development, it is now possible to push some level of decision making directly to computationally sophisticated sensors, rather than wait for data to arrive to a massive centralized location before a decision is made. This type of approach relies on networked sensors (called “agents” from here on) to actively collect and process data, and provide key control deci- sions to significantly improve both the quality/relevance of the collected data and the as- sociating decision making. The technological bottlenecks for such sensor networks stem from a lack of mathematics and algorithms to manage the systems, rather than difficulties associated with building and deploying them. Indeed, traditional sensor coordination strategies do not provide adequate solutions for this problem. Passive data collection methods (e.g., large sensor webs) can scale to large systems, but are generally not suited to highly dynamic environments, such as ad- vanced energy systems, where crucial decisions may need to be reached quickly and lo- cally. Approaches based on local decisions on the other hand cannot guarantee that each agent performing its task (maximize an agent objective) will lead to good network wide solution (maximize a network objective) without invoking cumbersome coordination rou- tines. There is currently a lack of algorithms that will enable self-organization and blend the efficiency of local decision making with the system level guarantees of global decision making, particularly when the systems operate in dynamic and stochastic environments. In this work we addressed this critical gap and provided a comprehensive solution to the problem of sensor coordination to ensure the safe, reliable, and robust operation of advanced energy systems. The differentiating aspect of the proposed work is in shift- ing the focus towards “what to observe” rather than “how to observe” in large sensor networks, allowing the agents to actively determine both the structure of the network and the relevance of the information they are seeking to collect. In addition to providing an implicit coordination mechanism, this approach allows the system to be reconfigured in response to changing needs (e.g., sudden external events requiring new responses) or changing sensor network characteristics (e.g., sudden changes to plant condition). Outcome Summary: All milestones associated with this project have been completed. In particular, private sensor objective functions were developed which are aligned with the global objective function, sensor effectiveness has been improved by using “sensor teams,” system efficiency has been improved by 30% using difference evaluation func- tions, we have demonstrated system reconfigurability for 20% changes in system con- ditions, we have demonstrated extreme scalability of our proposed algorithm, we have demonstrated that sensor networks can overcome disruptions of up to 20% in network conditions, and have demonstrated system reconfigurability to 20% changes in system conditions in hardware-based simulations. This final report summarizes how each of these milestones was achieved, and gives insight into future research possibilities past the work which has been completed. The following publications support these milestones [6, 8, 9, 10, 16, 18, 19].

Tumer, Kagan

2013-07-31T23:59:59.000Z

367

Emission coordinates for the navigation in space  

E-Print Network [OSTI]

A general approach to the problem of positioning by means of pulsars or other pulsating sources located at infinity is described. The counting of the pulses for a set of different sources whose positions in the sky and periods are assumed to be known, is used to provide null emission, or light, coordinates for the receiver. The measurement of the proper time intervals between successive arrivals of the signals from the various sources is used to give the final localization of the receiver, within an accuracy controlled by the precision of the onboard clock. The deviation from the flat case is discussed, separately considering the different possible causes: local gravitational potential, finiteness of the distance of the source, proper motion of the source, period decay, proper acceleration due to non-gravitational forces. Calculations turn out to be simple and the result is highly positive. The method can also be applied to a constellation of satellites orbiting the Earth.

A. Tartaglia

2009-10-15T23:59:59.000Z

368

Assessing Vehicle Electricity Demand Impacts on California Electricity Supply  

E-Print Network [OSTI]

management in the US electricity sector, Energy Policy, 23(deep reductions in electricity sector GHG emissions requireson the electricity sector. 19 Table 3.

McCarthy, Ryan W.

2009-01-01T23:59:59.000Z

369

SCENARIOS FOR MEETING CALIFORNIA'S 2050 CLIMATE GOALS California's Carbon Challenge Phase II Volume I: Non-Electricity Sectors and Overall Scenario Results  

SciTech Connect (OSTI)

This study provides an updated analysis of long-term energy system scenarios for California consistent with the State meeting its 2050 climate goal, including detailed analysis and assessment of electricity system build-out, operation, and costs across the Western Electricity Coordinating Council (WECC) region. Four key elements are found to be critical for the State to achieve its 2050 goal of 80 percent greenhouse (GHG) reductions from the 1990 level: aggressive energy efficiency; clean electricity; widespread electrification of passenger vehicles, building heating, and industry heating; and large-scale production of low-carbon footprint biofuels to largely replace petroleum-based liquid fuels. The approach taken here is that technically achievable energy efficiency measures are assumed to be achieved by 2050 and aggregated with the other key elements mentioned above to estimate resultant emissions in 2050. The energy and non-energy sectors are each assumed to have the objective of meeting an 80 percent reduction from their respective 1990 GHG levels for the purposes of analysis. A different partitioning of energy and non-energy sector GHG greenhouse reductions is allowed if emission reductions in one sector are more economic or technically achievable than in the other. Similarly, within the energy or non-energy sectors, greater or less than 80 percent reduction from 1990 is allowed for sub-sectors within the energy or non-energy sectors as long as the overall target is achieved. Overall emissions for the key economy-wide scenarios are considered in this report. All scenarios are compliant or nearly compliant with the 2050 goal. This finding suggests that multiple technical pathways exist to achieve the target with aggressive policy support and continued technology development of largely existing technologies.

Wei, Max; Greenblatt, Jeffrey; Donovan, Sally; Nelson, James; Mileva, Ana; Johnston, Josiah; Kammen, Daniel

2014-06-01T23:59:59.000Z

370

Western Gas Sands Project. Status report, April-June 1982  

SciTech Connect (OSTI)

The progress during April, May and June 1982, of government-sponsored projects to increase gas production from low permeability gas sands of the Western United States, is summarized in this edition of the WGSP Quarterly Status Report. In an effort to eliminate wellbore storage during the testing of tight reservoirs and substantially reduce time and cost of testing, CER Corporation is investigating downhole shut-off to develop a shut-off tool. During the quarter, the University of Oklahoma completed the two-dimensional lenticular well simulator model and submitted a final report. At Lawrence Livermore National Laboratories, work is complete on the 2-D crack model and work has begun on developing a pseudo 3-D crack model. Preparations have begun at Los Alamos National Laboratory to test the 6-in. permanent magnet pre-prototype tool in the American Petroleum Institute test pit at the University of Houston. At Sandia National Laboratories, an analytical version of the Surface Electrical Potential (SEP) mathematical model has been completed. The data provided by DOE Well Test Facility's drill stem test (DST) of MWX-1 indicated wellbore storage was predominant during the buildup period of the test and essentially masks the pressure transient normally used in the DST analysis. For the Multi-Well Experiment program, cased hole logging, directional surveys and two geophysical surveys were accomplished this quarter. 38 figures.

Not Available

1983-01-01T23:59:59.000Z

371

Recent Graduate Electrical Engineer  

Broader source: Energy.gov [DOE]

This position is located in the Office of Electric Reliability. The Office of Electric Reliability helps protect and improve the reliability and security of the nation's bulk power system through...

372

Electric Efficiency Standard  

Broader source: Energy.gov [DOE]

In December 2009, the Indiana Utility Regulatory Commission's (IURC) ordered utilities to establish demand-side management (DSM) electric savings goals leading to 2.0% reduction of electricity...

373

EIA - State Electricity Profiles  

Gasoline and Diesel Fuel Update (EIA)

(megawatts) 32,547 9 Electric utilities 23,615 7 Independent power producers & combined heat and power 8,933 11 Net generation (megawatthours) 152,878,688 6 Electric utilities...

374

EIA - State Electricity Profiles  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

16,355 24 Electric Utilities 13,131 20 Independent Power Producers & Combined Heat and Power 3,225 30 Net Generation (megawatthours) 65,005,678 24 Electric Utilities...

375

ELECTRICAL & COMPUTER ENGINEERING  

E-Print Network [OSTI]

ELECTRICAL & COMPUTER ENGINEERING SEMINAR "Agile Sensing Systems: Analysis, Design and Implementation" by Prof. Jun (Jason) Zhang Electrical and Computer Engineering University of Denver Tuesday requirements, computational complexity requirements, and robustness to time- varying physical environments

376

Electricity | Department of Energy  

Office of Environmental Management (EM)

Sources Electricity Electricity January 22, 2015 State of the Union Remarks on Energy in Four Charts We dive into the data behind President Obama's State of the Union statements...

377

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation library summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050.

Mai, T.

2012-10-01T23:59:59.000Z

378

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050.

Mai, T.

2012-11-01T23:59:59.000Z

379

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050.

Mai, T.

2013-04-01T23:59:59.000Z

380

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050.

Hand, M. M.

2012-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Designing electricity transmission auctions  

E-Print Network [OSTI]

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

382

Risk-Based Strategies for Wind/Pumped-Hydro Coordination under Electricity Markets  

E-Print Network [OSTI]

be reduced by coupling the wind farm with energy storage facilities, thus constituting a virtual power plant energy sources (RES). However, the operation of RES units such as wind or solar plants presents the inconve- nience of being intrinsically dependent on the variability of the wind or solar resource

Boyer, Edmond

383

Did geomagnetic activity challenge electric power reliability during solar cycle 23? Evidence from the PJM regional transmission  

E-Print Network [OSTI]

Did geomagnetic activity challenge electric power reliability during solar cycle 23? Evidence from through 30 April 2004. During this time period PJM coordinated the movement of wholesale electricity of challenged reliability is the incidence of out-of-economic-merit order dispatching due to adverse reactive

Schrijver, Karel

384

Abstract--This paper reports on work the Consortium for Electric Reliability Technology Solutions (CERTS) has been  

E-Print Network [OSTI]

Abstract-- This paper reports on work the Consortium for Electric Reliability Technology Solutions markets is: How The work described in this paper was coordinated by the Consortium for Electric. The work was funded by the Assistant Secretary of Energy Efficiency and Renewable Energy, Office of Power

385

Western Baldwin County, AL Grid Interconnection Project  

SciTech Connect (OSTI)

The Objective of this Project was to provide an additional supply of electricity to the affected portions of Baldwin County, AL through the purchase, installation, and operation of certain substation equipment.

Thomas DeBell

2011-09-30T23:59:59.000Z

386

-and -Coordinated Al in AlC2 . A Combined  

E-Print Network [OSTI]

- and -Coordinated Al in AlC2 - and AlCSi- . A Combined Photoelectron Spectroscopy and ab Initio the structure and chemical bonding in AlC2 - and AlCSi-. AlC2 - was found to have a C2V structure whereas AlCSi- was found to be almost linear, thus establishing -coordination of Al in AlC2 - and -coordination in Al

Simons, Jack

387

Transactive Control and Coordination of Distributed Assets for Ancillary Services  

SciTech Connect (OSTI)

The need to diversify energy supplies, the need to mitigate energy-related environmental impact, and the entry of electric vehicles in large numbers present challenges and opportunities to power system professionals. Wind and solar power provide many benefits, and to reap the benefits the resulting increased variability—forecasted as well as unforecasted—should be addressed. Demand resources are receiving increasing attention as one means of providing the grid balancing services. Control and coordination of a large number (~millions) of distributed smart grid assets requires innovative approaches. One such is transactive control and coordination (TC2)—a distributed, agent-based incentive and control system. The TC2 paradigm is to create a market system with the following characteristics: • Participation should be entirely voluntary. • The participant decides at what price s/he is willing to participate. • The bids and responses are automated. Such an approach has been developed and demonstrated by Pacific Northwest National Laboratory for energy markets. It is the purpose of this project to develop a similar approach for ancillary services. In this report, the following ancillary services are considered: • spinning reserve • ramping • regulation. These services are to be provided by the following devices: • refrigerators • water heaters • clothes dryers • variable speed drives. The important results are summarized below: The regulation signal can be divided into an energy-neutral high frequency component and a low frequency component. The high frequency component is particularly well suited for demand resources. The low frequency component, which carries energy non-neutrality, can be handled by a combination of generators and demand resources. An explicit method for such a separation is obtained from an exponentially weighted moving average filter. Causal filters (i.e., filters that process only present and past values of a signal) introduce delays that can be issues in some signal processing applications that treat the high frequency part as a noise to be eliminated. For regulation, the high frequency component is an essential part of the signal. The delay in the low frequency component is not a problem. A stochastic self-dispatch algorithm determines the response of the devices to the regulation signal. • In an ensemble of devices under normal operation, some devices turn on and some turn off in any time interval. Demand response necessitates turning off devices that would normally be on, or turning on devices that would normally be off. Over time, some of these would have turned off on their own. A formalism to determine expectation values under a combination of natural and forced attrition has been developed. This formalism provides a mechanism for accomplishing a desired power profile within a bid period. In particular, a method to minimize regulation requirement can be developed. The formulation provides valuable insights into control. • Some ancillary services—ramping to absorb unforecasted increase in renewable generation, and regulation down—require the demand resources to increase their energy use. Some resources such as HVAC systems can do this readily, whereas some others require enabling technology. Even without such technology, it is possible to arrange refrigerators and water heaters to have an energy debt and be ready to increase their energy use. A transactive bid mechanism of revolving debt can be developed for this purpose. Dramatic changes in control systems, architecture and markets are expected in the electrical grid. The technical capabilities of a large number of devices interacting with the grid are changing. While it is too early to describe complete solutions, TC2 has attractive features suitable for adapting to the changes. The analyses in this report and the activities planned for FY 14 and beyond are designed to facilitate this transition.

Subbarao, Krishnappa; Fuller, Jason C.; Kalsi, Karanjit; Somani, Abhishek; Pratt, Robert G.; Widergren, Steven E.; Chassin, David P.

2013-09-18T23:59:59.000Z

388

Intelligent Power Assist Algorithms for Electric Bicycles  

E-Print Network [OSTI]

electric hub motor . . . . . . . . . . . . . . . . . . .Golden Motor electric bicycle model MT-Electric hub motor in the front

Fan, Xuan

2010-01-01T23:59:59.000Z

389

IRRIGATION & ELECTRICAL DISTRICTS | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

IRRIGATION & ELECTRICAL DISTRICTS IRRIGATION & ELECTRICAL DISTRICTS IRRIGATION & ELECTRICAL DISTRICTS More Documents & Publications Interested Parties - WAPA Public...

390

The Case for Electric Vehicles  

E-Print Network [OSTI]

land Press, 1995 TESTING ELECTRIC VEHICLE DEMAND IN " HYBRIDThe Case for Electric Vehicles DanieI Sperlmg Reprint UCTCor The Case for Electric Vehicles Darnel Sperling Institute

Sperling, Daniel

2001-01-01T23:59:59.000Z

391

Electric Vehicle Smart Charging Infrastructure  

E-Print Network [OSTI]

for Multiplexed Electric Vehicle Charging”, US20130154561A1,Chynoweth, ”Intelligent Electric Vehicle Charging System”,of RFID Mesh Network for Electric Vehicle Smart Charging

Chung, Ching-Yen

2014-01-01T23:59:59.000Z

392

Electric Turbo Compounding Technology Update  

Broader source: Energy.gov (indexed) [DOE]

Turbo Compounding Technology Update Electric Turbo Compounding Technology Update 15 August, 2007 Carl Vuk 15 August, 2007 Carl Vuk Electric Turbo Compounding Highlights Electric...

393

Washington State Electric Vehicle  

E-Print Network [OSTI]

Washington State Electric Vehicle Implementation Bryan Bazard Maintenance and Alternate Fuel Technology Manager #12;Executive Order 14-04 Requires the procurement of electric vehicles where and equipment with electricity or biofuel to the "extent practicable" by June 2015 1. The vehicle is due

California at Davis, University of

394

LABORATORY IV ELECTRIC CIRCUITS  

E-Print Network [OSTI]

LABORATORY IV ELECTRIC CIRCUITS Lab IV - 1 In the first laboratory, you studied the behavior of electric fields and their effect on the motion of electrons using a cathode ray tube (CRT). This beam of electrons is one example of an electric current ­ charges in motion. The current in the CRT was simple

Minnesota, University of

395

Reduces electric energy consumption  

E-Print Network [OSTI]

BENEFITS · Reduces electric energy consumption · Reduces peak electric demand · Reduces natural gas consumption · Reduces nonhazardous solid waste and wastewater generation · Potential annual savings products for the automotive industry, electrical equipment, and miscellaneous other uses nationwide. ALCOA

396

DOE HANDBOOK ELECTRICAL SAFETY  

E-Print Network [OSTI]

DOE HANDBOOK ELECTRICAL SAFETY U.S. Department of Energy AREA SAFT Washington, D.C. 20585 of 139 3.0 HAZARD ANALYSIS 3.1 INTRODUCTION This chapter provides tools for assessing electrical hazards). The risk of a worker to an exposed electrical hazard is determined by (a) the classification

397

Renewable Electricity Futures Study  

E-Print Network [OSTI]

Renewable Electricity Futures Study Executive Summary NREL is a national laboratory of the U for Sustainable Energy, LLC. Volume 2 PDF Volume 3 PDF Volume 1 PDF Volume 4 PDF #12;Renewable Electricity Futures. National Renewable Energy Laboratory Suggested Citations Renewable Electricity Futures Study (Entire Report

398

Coordination of Copper to the Membrane-Bound Form of ?...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

environmental copper exposure. Citation: Dudzik CG, ED Walter, BS Abrams, MS Jurica, and GL Millhauser.2013."Coordination of Copper to the Membrane-Bound Form of...

399

Workplace Charging Challenge: Press Release template for Clean Cities coordinators  

Broader source: Energy.gov [DOE]

An editable press release that Clean Cities coordinators can use to announce local Partners' participation in the EV Everywhere Workplace Charging Challenge

400

Coordination and Hydrolysis of Plutonium Ions in Aqueous Solution...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hydrolysis of Plutonium Ions in Aqueous Solution using Car-Parrinello Molecular Dynamics Free Energy Coordination and Hydrolysis of Plutonium Ions in Aqueous Solution using...

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Coordination of Retail Demand Response with Midwest ISO Markets  

E-Print Network [OSTI]

Robinson, Michael, 2008, "Demand Response in Midwest ISOPresentation at MISO Demand Response Working Group Meeting,Coordination of Retail Demand Response with Midwest ISO

Bharvirkar, Ranjit

2008-01-01T23:59:59.000Z

402

A coordinate-dependent superspace deformation from string theory  

E-Print Network [OSTI]

Starting from a type II superstring model defined on $R^{2,2}\\times CY_6$ in a linear graviphoton background, we derive a coordinate dependent $C$-deformed ${\\cal N}=1$, $d=2+2$ superspace. The chiral fermionic coordinates $\\theta$ satisfy a Clifford algebra, while the other coordinate algebra remains unchanged. We find a linear relation between the graviphoton field strength and the deformation parameter. The null coordinate dependence of the graviphoton background allows to extend the results to all orders in $\\alpha'$.

L. G. Aldrovandi; F. A. Schaposnik; G. A. Silva

2006-03-08T23:59:59.000Z

403

Efficient Block-coordinate Descent Algorithms for the Group Lasso  

E-Print Network [OSTI]

general version of the Block Coordinate Descent (BCD) algorithm for the Group ...... 3. van den Berg, E., Friedlander, M.: Joint-sparse recovery from multiple ...

2012-02-20T23:59:59.000Z

404

Coordination of Energy Efficiency and Demand Response: A Resource...  

Open Energy Info (EERE)

Demand Response: A Resource of the National Action Plan for Energy Efficiency Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Coordination of Energy Efficiency and...

405

Accelerated Block-Coordinate Relaxation for Regularized Optimization  

E-Print Network [OSTI]

Aug 10, 2010 ... Accelerated Block-Coordinate Relaxation for Regularized Optimization. Stephen Wright (swright ***at*** cs.wisc.edu). Abstract: We discuss ...

Stephen Wright

2010-08-10T23:59:59.000Z

406

Roles of Acetone and Diacetone Alcohol in Coordination and Dissociatio...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

can form stable complexes, but that the effective number of atoms coordinating with uranium in the equatorial plane does not exceed five. Diacetone alcohol ligands are shown...

407

Role of Metal Coordination Structures in Enhancement of Electrocatalyt...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Structures in Enhancement of Electrocatalytic Activity of Ternary Nanoalloys for Oxygen Reduction Role of Metal Coordination Structures in Enhancement of Electrocatalytic...

408

Clean Cities Coordinators and Stakeholders Awarded at the Green...  

Broader source: Energy.gov (indexed) [DOE]

stakeholders received awards for their dedication to increasing the environmental sustainability of vehicle fleets. Green Fleet named Melissa Howell, coordinator of the Kentucky...

409

Parallel Coordinate Descent Methods for Big Data Optimization ?  

E-Print Network [OSTI]

Dec 4, 2012 ... Abstract. In this work we show that randomized (block) coordinate ... and this work is aimed at developing optimization algorithms suitable for.

2012-12-04T23:59:59.000Z

410

Interagency Wild and Scenic Rivers Coordinating Council's WSRA...  

Open Energy Info (EERE)

LibraryAdd to library PermittingRegulatory Guidance - Instructions: Interagency Wild and Scenic Rivers Coordinating Council's WSRA Section 7(a) FlowchartsPermitting...

411

Energy Saver Heroes: Clean Cities Coordinators | Department of...  

Broader source: Energy.gov (indexed) [DOE]

new meaning when considering the coalition coordinators of EERE's Clean Cities program. Clean Cities, the deployment arm of EERE's Vehicle Technology Program, works to support...

412

The synthesis and characterization of new iron coordination complexes utilizing an asymmetric coordinating chelate ligand  

SciTech Connect (OSTI)

The authors are investigating the structure/activity relationships of the bacterial enzyme, methane monooxygenase, which catalyzes the specific oxidation of methane to methanol. They then utilize this information to design and synthesize inorganic coordination complexes that mimic the function of the native enzyme but are more robust and have higher catalytic site density. They envision these catalysts to be useful in process catalytic reactors in the conversion of methane in natural gas to liquid methanol.

Baldwin, D.; Watkins, B.E.; Satcher, J.H.

1993-12-31T23:59:59.000Z

413

The synthesis and characterization of new iron coordination complexes utilizing an asymmetric coordinating chelate ligand  

SciTech Connect (OSTI)

We are investigating the structure/activity relationships of the bacterial enzyme methane monooxygenase, which catalyzes the specific oxidation of methane to methanol. We then utilize this information to design and synthesize inorganic coordination complexes that mimic the function of the native enzyme but are more robust and have higher catalytic site density. We envision these catalysts to be useful in process catalytic reactors in the conversion of methane in natural gas to liquid ethanol.

Watkins, B.E.; Satcher, J.H.

1995-03-01T23:59:59.000Z

414

Electrical Generation for More-Electric Aircraft using Solid...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

DE-AC05-76RL01830 Electrical Generation for More-Electric Aircraft using Solid Oxide Fuel Cells GA Whyatt LA Chick April 2012 PNNL-XXXXX Electrical Generation for More- Electric...

415

Determination of Electric-Field, Magnetic-Field, and Electric...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Electric-Field, Magnetic-Field, and Electric-Current Distributions of Infrared Optical Antennas: A Near-Field Determination of Electric-Field, Magnetic-Field, and Electric-Current...

416

Comparisons of pyrite variability from selected western Kentucky and western Pennsylvania coals  

SciTech Connect (OSTI)

Pyrite (and marcasite) variation in the lower Kittanning coal of western Pennsylvania has been petrographically characterized using three parameters of size (categories rather than absolute size), morphology (framboidal, euhedral, dendritic, massive, and cleat), and microlithotype (organic) association. The purpose of this study is to evaluate what influence paleo-environments have on the nature of variation of pyrite in coal. Comparison of coals has been done using the percentages of pyrite in the microlithotypes vitrite and clarite. In the lower Kittanning coal, framboidal pyrite is generally less abundant and dendritic pyrite was not observed at all. Euhedral pyrite exhibited no clear variation between the two environments. Massive pyrite was more abundant in the set of samples from the mine with the highest average pyritic sulfur but otherwise exhibited no variation. In contrast, a larger percentage of pyrite in the western Kentucky coals examined is framboidal and dendritic. Mines examined in the Moorman syncline of western Kentucky do have a framboidal pyrite percentage comparable to the lower Kittanning samples, but the percentage of dendritic pyrite (particularly in the Western Kentucky No. 9 coal) is significantly higher for the western Kentucky coals. Bulk petrography of the coals is similar with all having greater than 80% total vitrinite. The association of the pyritic sulfur does, however, change significantly between the various coals studied and particularly between the coals of western Kentucky and among the marine lower Kittanning samples and the fresh water lower Kittanning samples. Among the pyrite in the fresh water coals, massive (perhaps epigenetic) pyrite dominates the associations.

Frankie, K.A.; Hower, J.C.

1983-03-01T23:59:59.000Z

417

Impacts of Western Area Power Administration`s power marketing alternatives on air quality and noise  

SciTech Connect (OSTI)

The Western Area Power Administration, which is responsible for marketing electricity produced at the hydroelectric power-generating facilities operated by the Bureau of Reclamation on the Upper Colorado River, has proposed changes in the levels of its commitment (sales) of long-term firm capacity and energy to its customers. This report describes (1) the existing conditions of air resources (climate and meteorology, ambient air quality, and acoustic environment) of the region potentially affected by the proposed action and (2) the methodology used and the results of analyses conducted to assess the potential impacts on air resources of the proposed action and the commitment-level alternatives. Analyses were performed for the potential impacts of both commitment-level alternatives and supply options, which include combinations of electric power purchases and different operational scenarios of the hydroelectric power-generating facilities.

Chun, K.C.; Chang, Y.S.; Rabchuk, J.A.

1995-05-01T23:59:59.000Z

418

Random Walks and Electrical Networks Electrical Network  

E-Print Network [OSTI]

Feb 4, 2008 ... Random Walks and Electrical Networks. Hitting Probabilities and Voltage. Voltage. Connect a 1V battery to nodes a and b. ix,y is the current ...

Jonathon Peterson

2008-01-30T23:59:59.000Z

419

Electric Charge and Electric Field Electrostatics: Charge at rest  

E-Print Network [OSTI]

Chapter 16 Electric Charge and Electric Field #12;Electrostatics: Charge at rest Electric Charges of conservation of Electric Charge: The net amount of electric charge produced in any process is zero. Model, neutral). #12;· All protons and electrons have same magnitude of electric charge but their masses

Yu, Jaehoon

420

DIVISION 16 -ELECTRICAL 16000 GENERAL  

E-Print Network [OSTI]

Electrical Code American National Standards Institute National Electrical Manufacturers Association Institute of Electrical & Electronics Engineers Insulated Cable Engineers Association 3. Three copies of the followingDIVISION 16 - ELECTRICAL _____________________________________________________________ 16000

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Mapping water availability, projected use and cost in the western United States  

SciTech Connect (OSTI)

New demands for water can be satisfied through a variety of source options. In some basins surface and/or groundwater may be available through permitting with the state water management agency (termed unappropriated water), alternatively water might be purchased and transferred out of its current use to another (termed appropriated water), or non-traditional water sources can be captured and treated (e.g., wastewater). The relative availability and cost of each source are key factors in the development decision. Unfortunately, these measures are location dependent with no consistent or comparable set of data available for evaluating competing water sources. With the help of western water managers, water availability was mapped for over 1200 watersheds throughout the western US. Five water sources were individually examined, including unappropriated surface water, unappropriated groundwater, appropriated water, municipal wastewater and brackish groundwater. Also mapped was projected change in consumptive water use from 2010 to 2030. Associated costs to acquire, convey and treat the water, as necessary, for each of the five sources were estimated. These metrics were developed to support regional water planning and policy analysis with initial application to electric transmission planning in the western US.

Vincent C. Tidwell; Barbara D. Moreland; Katie M. Zemlick; Barry L. Roberts; Howard D. Passell; Daniel Jensen; Christopher Forsgren; Gerald Sehlke; Margaret A. Cook; Carey W. King

2014-06-01T23:59:59.000Z

422

Western States Shale Production (Billion Cubic Feet)  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteamYearTexas--StateWinterYearFeet)perWestern States Coalbed

423

Western Area Power Administration, Desert Southwest Region  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched FerromagnetismWaste and MaterialsWenjun Deng AssociateFeb-2015Sep-2014 940.05 Western

424

Western Area Power Administration Transmission Infrastructure Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered‰PNG IHDR€ÍSolar Energy SystemsFebruary 7-8,March 8,8)Normal 27 14,2TOPICS Western

425

Western NY Energy LLC | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:SeadovCooperative Jump to: navigation,Western Cooling Efficiency Center Place:GeothermalNY

426

Sandia National Laboratories: Western water management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1development Sandia, NREL Release Wave EnergyLinks Water PowerWaveDyn WEC-SimWestern

427

Federal Energy Resources Modernization Coordinating Committee  

SciTech Connect (OSTI)

This report summarizes the broad range of activities that are focused on meeting the President's Executive Order on Federal Energy Management promulgated to meet energy savings goals and encourage more efficient management of all federal energy resources. These activities are reported semiannually under the auspices of the Federal Energy Resource Modernization (FERM) Coordinating Committee, and as such include activities undertaken from April 1, 1992, through September 30, 1992. The activities reported are classified into four major categories: (1) technology-base support, which includes development of processes, software, metering and monitoring equipment and strategies, and other tools for federal energy managers to better understand and characterize their energy resources; (2) federal energy systems testing and monitoring; (3) federal energy systems revitalization projects at federal installations in cooperation with the utilities serving the sites; and (4) energy supply, distribution and end-use conservation assessment for federal agencies and/or facilities. Lighting systems and air conditioning projects at federal facilities, especially military bases are updated.

Parker, G.B.

1993-04-01T23:59:59.000Z

428

Design Methodology for Unmannded Aerial Vehicle (UAV) Team Coordination  

E-Print Network [OSTI]

1 Design Methodology for Unmannded Aerial Vehicle (UAV) Team Coordination F.B. da Silva S.D. Scott-mail: halab@mit.edu #12;2 Design Methodology for Unmannded Aerial Vehicle (UAV) Team Coordination by F.B. da Silva, S.D. Scott, and M.L. Cummings Executive Summary Unmanned Aerial Vehicle (UAV) systems, despite

Cummings, Mary "Missy"

429

Engineering Process Coordination based on A Service Event Notification Model  

E-Print Network [OSTI]

Engineering Process Coordination based on A Service Event Notification Model Jian Cao1, Jie Wang2 the project lifecycle process. Grid-based engineering service is a potentially useful technology for process coordination. Thus we propose a Grid service based event notification model to support engineering process

Stanford University

430

Master of Arts in Liberal Studies Coordinated Study Grid  

E-Print Network [OSTI]

Studies 3 UNIV 7200 Liberal Studies Seminar 3 UNIV 7996 Special Project 3 Coordinated Study ­ Courses a contract for a specific course of study leading to the Master of Arts in Liberal Studies; the Graduate must be approved by the Graduate Coordinator prior to certification for graduation. Student signature

Dasgupta, Dipankar

431

Article 003S02 Eye-hand coordination 1  

E-Print Network [OSTI]

Article 003S02 Eye-hand coordination 1 Correspondence and reprint requests to: J. Douglas Crawford by a Human Frontier Science Program Fellowship. Abstract Eye-hand coordination is complicated by the fact that the eyes are constantly in motion relative to the head.This poses problems in interpreting the spatial

Henriques, Denise Y. P.

432

Coordinating a Constrained Channel with Linear Wholesale Price Contracts.  

E-Print Network [OSTI]

Coordinating a Constrained Channel with Linear Wholesale Price Contracts. Navid Sabbaghi, Yossi, there is a set of linear wholesale price contracts that coordinates the channel while allowing the supplier-supplier/one-newsvendor channel configuration (with each supplier selling a unique product). We analyze how this set of wholesale

Tsitsiklis, John

433

AIAA-2002-5410 COORDINATION SPECIFICATION FOR DISTRIBUTED OPTIMAL  

E-Print Network [OSTI]

of the concurrency in the coordination is essential, in particular for large and non-hierarchic coordination architectures. This paper proposes to use concepts from communicating sequential processes (CSP) developed in concurrency theory. CSP allows the description of the MDO co- ordination as a number of parallel processes

Papalambros, Panos

434

Coordinate noncommutativity in strong non-uniform magnetic fields  

E-Print Network [OSTI]

Noncommuting spatial coordinates are studied in the context of a charged particle moving in a strong non-uniform magnetic field. We derive a relation involving the commutators of the coordinates, which generalizes the one realized in a strong constant magnetic field. As an application, we discuss the noncommutativity in the magnetic field present in a magnetic mirror.

J. Frenkel; S. H. Pereira

2004-09-23T23:59:59.000Z

435

Coordination Breakdowns and Their Impact on Development Productivity and  

E-Print Network [OSTI]

coordinating the effort of many individuals across the multiple stages of the development process. In software in a reduction of work dependencies between teams developing interdependent modules. Although that research stream has been quite influential, it considers a static view of the problem of coordination

Herbsleb, James D.

436

How Green Will Electricity beHow Green Will Electricity be When Electric Vehicles Arrive?When Electric Vehicles Arrive?  

E-Print Network [OSTI]

How Green Will Electricity beHow Green Will Electricity be When Electric Vehicles Arrive?When Electric Vehicles Arrive? Edward S. Rubin Department of Engineering and Public Policy Department-carbon electricity and plug-in hybrid electric vehicles (PHEVs) ? · In light of the above, would adoption of PHEVs

437

Emission vs Fermi coordinates: applications to relativistic positioning systems  

E-Print Network [OSTI]

A 4-dimensional relativistic positioning system for a general spacetime is constructed by using the so called "emission coordinates". The results apply in a small region around the world line of an accelerated observer carrying a Fermi triad, as described by the Fermi metric. In the case of a Schwarzschild spacetime modeling the gravitational field around the Earth and an observer at rest at a fixed spacetime point, these coordinates realize a relativistic positioning system alternative to the current GPS system. The latter is indeed essentially conceived as Newtonian, so that it necessarily needs taking into account at least the most important relativistic effects through Post-Newtonian corrections to work properly. Previous results concerning emission coordinates in flat spacetime are thus extended to this more general situation. Furthermore, the mapping between spacetime coordinates and emission coordinates is completely determined by means of the world function, which in the case of a Fermi metric can be explicitly obtained.

Donato Bini; Andrea Geralico; Matteo Luca Ruggiero; Angelo Tartaglia

2008-09-05T23:59:59.000Z

438

A System Dynamics Study of Carbon Cycling and Electricity Generation from Energy Crops  

E-Print Network [OSTI]

Information Administration analyzed the implications of the bill and found that under such a policy renewable energy will increase, with the strongest response coming from biomass energy. Dedicated energy crops, an electric reliability organization for the western United States, Canada and Mexico. (This and other

Ford, Andrew

439

EIS-0150: Salt Lake City Area Integrated Projects Electric Power Marketing  

Broader source: Energy.gov [DOE]

The Western Area Power Administration prepared this environmental impact statement to analyze the environmental impacts of its proposal to establish the level of its commitment (sales) of long- term firm electrical capacity and energy from the Salt Lake City Area Integrated Projects hydroelectric power plants.

440

Balancing Cost and Risk: The Treatment of Renewable Energy in Western Utility Resource Plans  

SciTech Connect (OSTI)

Markets for renewable energy have historically been motivated primarily by policy efforts, but a less widely recognized driver is poised to also play a major role in the coming years: utility integrated resource planning (IRP). Resource planning has re-emerged in recent years as an important tool for utilities and regulators, particularly in regions where retail competition has failed to take root. In the western United States, the most recent resource plans contemplate a significant amount of renewable energy additions. These planned additions--primarily coming from wind power--are motivated by the improved economics of wind power, a growing acceptance of wind by electric utilities, and an increasing recognition of the inherent risks (e.g., natural gas price risk, environmental compliance risk) in fossil-based generation portfolios. This report examines how twelve western utilities treat renewable energy in their recent resource plans. In aggregate, these utilities supply approximately half of all electricity demand in the western United States. Our purpose is twofold: (1) to highlight the growing importance of utility IRP as a current and future driver of renewable energy, and (2) to identify methodological/modeling issues, and suggest possible improvements to methods used to evaluate renewable energy as a resource option. Here we summarize the key findings of the report, beginning with a discussion of the planned renewable energy additions called for by the twelve utilities, an overview of how these plans incorporated renewables into candidate portfolios, and a review of the specific technology cost and performance assumptions they made, primarily for wind power. We then turn to the utilities' analysis of natural gas price and environmental compliance risks, and examine how the utilities traded off portfolio cost and risk in selecting a preferred portfolio.

Bolinger, Mark; Wiser, Ryan

2005-08-10T23:59:59.000Z

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

COORDINATING HUMAN AND MATERIAL RESOURCES Construction project management is the art of directing and coordinating human and material  

E-Print Network [OSTI]

COORDINATING HUMAN AND MATERIAL RESOURCES Construction project management is the art of directing and coordinating human and material resources throughout the life of a project by using modern management. Today's construction engineers and managers are faced with unprecedented challenges in planning

Simaan, Nabil

442

Managing Carbon Regulatory Risk in Utility Resource Planning:Current Practices in the Western United States  

SciTech Connect (OSTI)

Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. Assuch, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by fifteen electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without Federal climate regulation in the U.S., the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of U.S. electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations

Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

2008-05-16T23:59:59.000Z

443

Managing Carbon Regulatory Risk in Utility Resource Planning: Current Practices in the Western United States  

SciTech Connect (OSTI)

Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. As such, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by fifteen electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without Federal climate regulation in the U.S., the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of U.S. electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations.

Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

2008-07-11T23:59:59.000Z

444

Electric power monthly  

SciTech Connect (OSTI)

The Energy Information Administration (EIA) prepares the Electric Power Monthly (EPM) for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. This publication provides monthly statistics for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source, consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead.

NONE

1995-08-01T23:59:59.000Z

445

Thermoacoustic magnetohydrodynamic electrical generator  

DOE Patents [OSTI]

A thermoacoustic magnetohydrodynamic electrical generator includes an intrinsically irreversible thermoacoustic heat engine coupled to a magnetohydrodynamic electrical generator. The heat engine includes an electrically conductive liquid metal as the working fluid and includes two heat exchange and thermoacoustic structure assemblies which drive the liquid in a push-pull arrangement to cause the liquid metal to oscillate at a resonant acoustic frequency on the order of 1000 Hz. The engine is positioned in the field of a magnet and is oriented such that the liquid metal oscillates in a direction orthogonal to the field of the magnet, whereby an alternating electrical potential is generated in the liquid metal. Low-loss, low-inductance electrical conductors electrically connected to opposite sides of the liquid metal conduct an output signal to a transformer adapted to convert the low-voltage, high-current output signal to a more usable higher voltage, lower current signal.

Wheatley, J.C.; Swift, G.W.; Migliori, A.

1984-11-16T23:59:59.000Z

446

Thermoacoustic magnetohydrodynamic electrical generator  

DOE Patents [OSTI]

A thermoacoustic magnetohydrodynamic electrical generator includes an intrinsically irreversible thermoacoustic heat engine coupled to a magnetohydrodynamic electrical generator. The heat engine includes an electrically conductive liquid metal as the working fluid and includes two heat exchange and thermoacoustic structure assemblies which drive the liquid in a push-pull arrangement to cause the liquid metal to oscillate at a resonant acoustic frequency on the order of 1,000 Hz. The engine is positioned in the field of a magnet and is oriented such that the liquid metal oscillates in a direction orthogonal to the field of the magnet, whereby an alternating electrical potential is generated in the liquid metal. Low-loss, low-inductance electrical conductors electrically connected to opposite sides of the liquid metal conduct an output signal to a transformer adapted to convert the low-voltage, high-current output signal to a more usable higher voltage, lower current signal.

Wheatley, John C. (Los Alamos, NM); Swift, Gregory W. (Los Alamos, NM); Migliori, Albert (Santa Fe, NM)

1986-01-01T23:59:59.000Z

447

Impact of High Solar Penetration in the Western Interconnection  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Impact of High Solar Penetration in the Western Interconnection Debra Lew National Renewable Energy Laboratory Nicholas Miller, Kara Clark, Gary Jordan, and Zhi Gao GE Energy...

448

Groundwater investigation and modeling - western desert of Iraq.  

E-Print Network [OSTI]

??The region of interest is part from Iraqi western desert covering an area about 100,000 km˛. Several of the large wadis such as Hauran, Amij,… (more)

Al-Muqdadi, Sameh Wisam

2012-01-01T23:59:59.000Z

449

Western-UGP Transmission and Ancillary Services Rates Customer...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

responsibility for irrigation and municipal consumption as well as dam and powerplant construction, operation and maintenance. P a g e | 3 Western annually sells and delivers...

450

2011 Annual Planning Summary for Western Area Power Administration (WAPA)  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Western Area Power Administration (WAPA).

451

Western Interstate Nuclear Compact State Nuclear Policy (Multiple States)  

Broader source: Energy.gov [DOE]

Legislation authorizes states' entrance into the Western Interstate Nuclear Compact, which aims to undertake the cooperation of participating states in deriving the optimum benefit from nuclear and...

452

NorthWestern Energy- Residential Energy Efficiency Rebate Program  

Broader source: Energy.gov [DOE]

NorthWestern Energy offers a variety of rebates for residential customers to make energy efficiency improvements in their existing homes. Customers who purchase or implement energy efficient...

453

NorthWestern Energy- USB Renewable Energy Fund  

Broader source: Energy.gov [DOE]

NorthWestern Energy (NWE), formerly Montana Power Company, periodically provides funding to its customers for renewable energy projects. In 1997, Montana established the Universal System Benefits ...

454

NorthWestern Energy- Commercial Energy Efficiency Rebate Program  

Broader source: Energy.gov [DOE]

NorthWestern Energy offers multiple rebate programs for commercial and industrial customers to make energy efficient improvements to their businesses. The E+ Commercial Natural Gas Savings Program...

455

Western Riverside Council of Governments- Large Commercial PACE (California)  

Broader source: Energy.gov [DOE]

Western Riverside Council of Governments (WRCOG) is offering business owners in WRCOG participating jurisdictions an opportunity to finance energy and water efficiency projects for their commercial...

456

Western Area Power Administration (WFP) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

future. Western Area Power Administration Responsible Contacts Thomas Wheeler Director, Workforce Analysis & Planning Division E-mail thomas.wheeler@hq.doe.gov Phone (202)...

457

EOCENE BIRDS FROM THE WESTERN MARGIN OF SOUTHERNMOST SOUTH AMERICA .  

E-Print Network [OSTI]

??This study presents the first record of Eocene birds from the western margin of southernmost South America. Three localities in Magallanes, southern Chile, have yielded… (more)

Sallaberry, Michel

2010-01-01T23:59:59.000Z

458

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

. The Western Electricity Coordinating Council (WECC) is the sub-regional entity responsible for coordinating-regions are using probabilistic methods to assess adequacy (the lone exception is WECC, which is planning to move

459

2012 National Electricity Forum  

Broader source: Energy.gov (indexed) [DOE]

and Planning, Arizona Public Service * Jan Strack, Grid Planning, Regulatory & Economics Manager, San Diego Gas & Electric * Mario Villar, Vice President, Transmission, NV...

460

Electric Transmission Lines (Nebraska)  

Broader source: Energy.gov [DOE]

The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway crossings. This section contains general regulations...

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Capacity Markets for Electricity  

E-Print Network [OSTI]

ternative Approaches for Power Capacity Markets”, Papers andprof id=pjoskow. Capacity Markets for Electricity [13]Utility Commission- Capacity Market Questions”, available at

Creti, Anna; Fabra, Natalia

2004-01-01T23:59:59.000Z

462

2012 National Electricity Forum  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Development, American Electric Power * John P. Buechler, Executive Regulatory Policy Advisor, New York Independent System Operator * Jim Busbin, Supervisor, Bulk Power, Southern...

463

Integrating Electricity Subsector  

Broader source: Energy.gov (indexed) [DOE]

2013 Electric Power Research Institute, Inc. All rights reserved. This publication is a corporate document that should be cited in the literature in the following manner:...

464

Electricity | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

between two of history's most important energy-related engineers: Thomas Edison and Nikola Tesla. Edison and Tesla's developments in electric power generation and...

465

Joint Electrical Utilities (Iowa)  

Broader source: Energy.gov [DOE]

Cities may establish utilities to acquire existing electric generating facilities or distribution systems. Acquisition, in this statute, is defined as city involvement, and includes purchase, lease...

466

Electric power annual 1992  

SciTech Connect (OSTI)

The Electric Power Annual presents a summary of electric utility statistics at national, regional and State levels. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts and the general public with historical data that may be used in understanding US electricity markets. The Electric Power Annual is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. ``The US Electric Power Industry at a Glance`` section presents a profile of the electric power industry ownership and performance, and a review of key statistics for the year. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; retail sales; revenue; financial statistics; environmental statistics; electric power transactions; demand-side management; and nonutility power producers. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences in US electricity power systems. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. Monetary values in this publication are expressed in nominal terms.

Not Available

1994-01-06T23:59:59.000Z

467

ELECTRICAL & COMPUTER ENGINEERING  

E-Print Network [OSTI]

ELECTRICAL & COMPUTER ENGINEERING SEMINAR "Considerations for Curriculum Planning and Computer Engineering Colorado State University Monday, Feb. 20, 2012, 11:00 a.m. Location: LSC 210 Abstract

468

Electricity | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

the current electric grid into the next-generation grid. PE enable utilities to deliver power to their customers effectively while providing increased reliability, security, and...

469

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and fuel consumption In this section, we look at the resources used to produce electricity. Generating units are chosen to run primarily on their operating costs, of which...

470

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wholesale Markets: October 2014 The United States has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale...

471

2012 National Electricity Forum  

Energy Savers [EERE]

of reliability, resource options, wholesale competition and market power, cost of electricity to consumers, environmental quality, or other? Are these consequences so...

472

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wholesale Markets: September 2014 The United States has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale...

473

Electrically conductive cellulose composite  

DOE Patents [OSTI]

An electrically conductive cellulose composite includes a cellulose matrix and an electrically conductive carbonaceous material incorporated into the cellulose matrix. The electrical conductivity of the cellulose composite is at least 10 .mu.S/cm at 25.degree. C. The composite can be made by incorporating the electrically conductive carbonaceous material into a culture medium with a cellulose-producing organism, such as Gluconoacetobacter hansenii. The composites can be used to form electrodes, such as for use in membrane electrode assemblies for fuel cells.

Evans, Barbara R.; O'Neill, Hugh M.; Woodward, Jonathan

2010-05-04T23:59:59.000Z

474

Electric Utility Industry Update  

Broader source: Energy.gov [DOE]

Presentation—given at the April 2012 Federal Utility Partnership Working Group (FUPWG) meeting—covers significant electric industry trends and industry priorities with federal customers.

475

DOE Electricity Advisory Committee  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of the impact and benefit of wide scale use of variable resources including wind and solar power generation on electric power system reliability and greenhouse gas reduction; 3...

476

Perforation patterned electrical interconnects  

DOE Patents [OSTI]

This disclosure describes systems and methods for increasing the usable surface area of electrical contacts within a device, such as a thin film solid state device, through the implementation of electrically conductive interconnects. Embodiments described herein include the use of a plurality of electrically conductive interconnects that penetrate through a top contact layer, through one or more multiple layers, and into a bottom contact layer. The plurality of conductive interconnects may form horizontal and vertical cross-sectional patterns. The use of lasers to form the plurality of electrically conductive interconnects from reflowed layer material further aids in the manufacturing process of a device.

Frey, Jonathan

2014-01-28T23:59:59.000Z

477

Physical Impacts of Climate Change on the Western US Electricity System: A Scoping Study  

E-Print Network [OSTI]

shortages caused by lack of cooling water and excessiveconstraints due to lack of cooling water Physical Impacts ofgeneration due to a lack of cooling water). It would thus be

Coughlin, Katie

2008-01-01T23:59:59.000Z

478

Physical Impacts of Climate Change on the Western US Electricity System: A Scoping Study  

E-Print Network [OSTI]

on the Columbia River Basin’s Water Resources. Nov. 2005caused by lack of cooling water and excessive demand, andserious threats to both water and power supply [36, 48]. Due

Coughlin, Katie

2008-01-01T23:59:59.000Z

479

Physical Impacts of Climate Change on the Western US Electricity System: A Scoping Study  

E-Print Network [OSTI]

on high-elevation hydropower generation in California’sCO2 [58] Solar Irradiance Hydropower Hadley et al. Franco &summer flows decrease hydropower production in summer and

Coughlin, Katie

2008-01-01T23:59:59.000Z

480

Physical Impacts of Climate Change on the Western US Electricity System: A Scoping Study  

E-Print Network [OSTI]

Impacts on Regional Resource Assessment and Support for WGAtime frame, the Long Term Resource Assessment, and seasonalDevelopment Seasonal Resource Assessment Planning Area

Coughlin, Katie

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "western electricity coordinating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Audit of the Western Area Power Administration's Contract with Basin Electric Power Cooperative, IG-0409  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3--Logistical5/08 Attendance List1-02Evaluation Report TheU.S.Audit of the

482

Physical Impacts of Climate Change on the Western US Electricity System: A Scoping Study  

E-Print Network [OSTI]

no clear trend in wind potential More precipitation falls aspotential impacts on wind power potential and on hydropower

Coughlin, Katie

2008-01-01T23:59:59.000Z

483

Automatic ball bar for a coordinate measuring machine  

DOE Patents [OSTI]

An automatic ball bar for a coordinate measuring machine determines the accuracy of a coordinate measuring machine having at least one servo drive. The apparatus comprises a first and second gauge ball connected by a telescoping rigid member. The rigid member includes a switch such that inward radial movement of the second gauge ball relative to the first gauge ball causes activation of the switch. The first gauge ball is secured in a first magnetic socket assembly in order to maintain the first gauge ball at a fixed location with respect to the coordinate measuring machine. A second magnetic socket assembly secures the second gauge ball to the arm or probe holder of the coordinate measuring machine. The second gauge ball is then directed by the coordinate measuring machine to move radially inward from a point just beyond the length of the ball bar until the switch is activated. Upon switch activation, the position of the coordinate measuring machine is determined and compared to known ball bar length such that the accuracy of the coordinate measuring machine can be determined. 5 figs.

Jostlein, H.

1997-07-15T23:59:59.000Z

484

Automatic ball bar for a coordinate measuring machine  

DOE Patents [OSTI]

An automatic ball bar for a coordinate measuring machine determines the accuracy of a coordinate measuring machine having at least one servo drive. The apparatus comprises a first and second gauge ball connected by a telescoping rigid member. The rigid member includes a switch such that inward radial movement of the second gauge ball relative to the first gauge ball causes activation of the switch. The first gauge ball is secured in a first magnetic socket assembly in order to maintain the first gauge ball at a fixed location with respect to the coordinate measuring machine. A second magnetic socket assembly secures the second gauge ball to the arm or probe holder of the coordinate measuring machine. The second gauge ball is then directed by the coordinate measuring machine to move radially inward from a point just beyond the length of the ball bar until the switch is activated. Upon switch activation, the position of the coordinate measuring machine is determined and compared to known ball bar length such that the accuracy of the coordinate measuring machine can be determined.

Jostlein, Hans (Naperville, IL)

1997-01-01T23:59:59.000Z

485

Atlas of Coordinate Charts on de Sitter Spacetime  

E-Print Network [OSTI]

The de Sitter manifold admits a wide variety of interesting coordinatizations. The 'atlas' is a compilation of the coordinate charts referenced throughout the literature, and is presented in the form of tables, the starting point being the embedding in a higher-dimensional Minkowski spacetime. The metric tensor and the references where the coordinate frame is discussed or used in applications are noted. Additional information is given for the entries with significant use: a convenient tetrad and the form taken by the Killing vectors in the respective coordinate frame.

Gabriel Pascu

2012-11-11T23:59:59.000Z

486

Harmonic coordinates in the string and membrane equations  

E-Print Network [OSTI]

In this note, we first show that the solutions to Cauchy problems for two versions of relativistic string and membrane equations are diffeomorphic. Then we investigate the coordinates transformation presented in Ref. [9] (see (2.20) in Ref. [9]) which plays an important role in the study on the dynamics of the motion of string in Minkowski space. This kind of transformed coordinates are harmonic coordinates, and the nonlinear relativistic string equations can be straightforwardly simplified into linear wave equations under this transformation.

Chun-Lei He; Shou-Jun Huang

2010-04-16T23:59:59.000Z

487

Plug-In Electric Vehicle Handbook for Electrical  

E-Print Network [OSTI]

Plug-In Electric Vehicle Handbook for Electrical Contractors #12;Plug-In Electric Vehicle Handbook Infrastructure Installing plug-in electric vehicle (PEV) charg- ing infrastructure requires unique knowledge Thanks to the Electric Vehicle Infrastructure Training Program for assisting with the production

488

Electricity Real Options Valuation  

E-Print Network [OSTI]

In this paper a real option approach for the valuation of real assets is presented. Two continuous time models used for valuation are described: geometric Brownian motion model and interest rate model. The valuation for electricity spread option under Vasicek interest model is placed and the formulas for parameter estimators are calculated. The theoretical part is confronted with real data from electricity market.

Ewa Broszkiewicz-Suwaj

2006-08-16T23:59:59.000Z

489

Electricity Real Options Valuation  

E-Print Network [OSTI]

In this paper a real option approach for the valuation of real assets is presented. Two continuous time models used for valuation are described: geometric Brownian motion model and interest rate model. The valuation for electricity spread option under Vasicek interest model is placed and the formulas for parameter estimators are calculated. The theoretical part is confronted with real data from electricity market.

Broszkiewicz-Suwaj, E

2006-01-01T23:59:59.000Z

490

Electrical shock accident investigation  

SciTech Connect (OSTI)

This report documents results of the accident investigation of an electrical shock received by two subcontractor employees on May 13, 1994, at the Pinellas Plant. The direct cause of the electrical shock was worker contact with a cut ``hot`` wire and a grounded panelboard (PPA) enclosure. Workers presumed that all wires in the enclosure were dead at the time of the accident and did not perform thorough Lockout/Tagout (LO/TO). Three contributing causes were identified. First, lack of guidance in the drawing for the modification performed in 1987 allowed the PPA panel to be used as a junction box. The second contributing cause is that Environmental, Safety and Health (ES&H) procedures do not address multiple electrical sources in an enclosure. Finally, the workers did not consider the possibility of multiple electrical sources. The root cause of the electrical shock was the inadequacy of administrative controls, including construction requirement and LO/TO requirements, and subcontractor awareness regarding multiple electrical sources. Recommendations to prevent further reoccurrence of this type of accident include revision of ES&H Standard 2.00, Electrical Safety Program Manual, to document requirements for multiple electrical sources in a single enclosure to specify a thorough visual inspection as part of the voltage check process. In addition, the formality of LO/TO awareness training for subcontractor electricians should be increased.

Not Available

1994-09-30T23:59:59.000Z

491

Hawaii electric system reliability.  

SciTech Connect (OSTI)

This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers' views of reliability %E2%80%9Cworth%E2%80%9D and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers' views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

Silva Monroy, Cesar Augusto; Loose, Verne William

2012-09-01T23:59:59.000Z

492

Electrical Demand Control  

E-Print Network [OSTI]

Almost every building owner or manager is interested in controlling electrical costs. Since the HVAC system is a large user of electricity, this article will discuss what can be done in the HVAC system to influence parts of the utility bill....

Eppelheimer, D. M.

1984-01-01T23:59:59.000Z

493

Superconductivity for Electric Systems  

E-Print Network [OSTI]

1 Superconductivity for Electric Systems Superconductivity Program Quarterly Progress Report For the Period October 1, 2006, to December 31, 2006 #12;2 Superconductivity Program Quarterly Progress Report Superconductivity Program Oak Ridge National Laboratory For U.S. Department of Energy Office of Electricity Delivery

494

Superconductivity for Electric Systems  

E-Print Network [OSTI]

Superconductivity for Electric Systems Superconductivity Program Quarterly Progress Report For the Period January 1, 2007 to March 31, 2007 #12;2 Superconductivity Program Quarterly Progress Report Superconductivity Program Oak Ridge National Laboratory For: Department of Energy Office of Electricity Delivery

495

Superconductivity for Electric Systems  

E-Print Network [OSTI]

Superconductivity for Electric Systems Superconductivity Program Quarterly Progress Report For the Period April 1, 2007, to June 30, 2007 #12;2 Superconductivity Program Quarterly Progress Report Superconductivity Program Oak Ridge National Laboratory For: Department of Energy Office of Electricity Delivery

496

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation library summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. It is being presented at the Utility Variable-Generation Integration Group Fall Technical Workshop on October 24, 2012.

Hand, M.

2012-10-01T23:59:59.000Z

497

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. It was presented in a Power Systems Engineering Research Center webinar on September 4, 2012.

Mai, T.

2012-08-01T23:59:59.000Z

498

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation library summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. It was presented in an Union of Concerned Scientists webinar on June 12, 2012.

Hand, M.; Mai, T.

2012-08-01T23:59:59.000Z

499

Energy 101: Electric Vehicles  

ScienceCinema (OSTI)

This edition of Energy 101 highlights the benefits of electric vehicles, including improved fuel efficiency, reduced emissions, and lower maintenance costs. For more information on electric vehicles from the Office of Energy Efficiency and Renewable Energy, visit the Vehicle Technologies Program website: http://www1.eere.energy.gov/vehiclesandfuels/

None

2013-05-29T23:59:59.000Z

500

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation library summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. It was presented in a webinar given by the California Energy Commission.

Hand, M. M.

2012-08-01T23:59:59.000Z