National Library of Energy BETA

Sample records for wells production wells

  1. Category:Production Wells | Open Energy Information

    Open Energy Info (EERE)

    Wells Jump to: navigation, search Geothermalpower.jpg Looking for the Production Wells page? For detailed information on Production Wells, click here. Category:Production Wells...

  2. Offshore multiple well drilling and production apparatus

    SciTech Connect (OSTI)

    Kirkland, K.G.; Masciopinto, A.J.

    1980-03-11

    A modular multiple well drilling and production template structure is combined with a production riser base module to provide an underwater apparatus which allows a plurality of wells to be drilled, completed and produced by operations carried out from a single vessel or platform without remote installation of flowlines.

  3. Articulated plural well deep water production system

    SciTech Connect (OSTI)

    Lawson, J.

    1980-07-08

    Apparatus for subsea production of fluids through a manifold and central riser from a plurality of individual wells drilled in different parts of a field in deep water, is described that is comprised of: a central manifold base having flow line connectors thereon; an elongated boom for each well to be produced in a field, each boom being rigidly attached to the manifold base; a temporary guide base mounted to the other end of each boom for establishing a well site; and a flow line extending along each boom from a flow line connector on the central manifold base. A method of producing well fluids from a number of individual wells drilled in different parts of a field located in deep water to a production platform via a central riser, which comprises the steps of: submerging to the ocean floor a subsea production apparatus which includes a central manifold base having an elongated boom for each well articulated thereto at one end and mounting a temporary guide base at the other end of the boom for establishing a well site, and a preinstalled flow line extending along each boom from the manifold base; landing a manifold section on the manifold; and landing a subsea tree on each temporary guide base.

  4. Production Well Performance Enhancement using Sonication Technology

    SciTech Connect (OSTI)

    Adewumi, Michael A; Ityokumbul, M Thaddeus; Watson, Robert W; Eltohami, Eltohami; Farias, Mario; Heckman, Glenn; Houlihan, Brendan; Karoor, Samata Prakash; Miller, Bruce G; Mohammed, Nazia; Olanrewaju, Johnson; Ozdemir, Mine; Rejepov, Dautmamed; Sadegh, Abdallah A; Quammie, Kevin E; Zaghloul, Jose; Hughes, W Jack; Montgomery, Thomas C

    2005-12-31

    -up purposes was limited due to funding constraints. The overall plan for this task was to perlorm field trials with the sonication tooL These trials were to be performed in production and/or injection wells located in Pennsylvania, New York, and West Virginia. Four new wells were drilled in preparation for the field demonstration. Baseline production data were collected and reservoir simulator tuned to simulate these oil reservoirs. The sonication tools were designed for these wells. However, actual field testing could not be carried out because of premature termination of the project.

  5. Alcorn wells bolster Philippines oil production

    SciTech Connect (OSTI)

    Not Available

    1992-09-21

    This paper reports that Alcorn International Inc., Houston, is producing about 16,500 b/d of oil from West Linapacan A field in the South China Sea off the Philippines. The field's current production alone is more than fivefold the Philippines' total average oil flow of 3,000 b/d in 1991. It's part of a string of oil and gas strikes off Palawan Island that has made the region one of the hottest exploration/development plays in the Asia-Pacific theater.

  6. Well Placement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Well Placement Well Placement LANL maintains an extensive groundwater monitoring and surveillance program through sampling. August 1, 2013 Finished groundwater well head with solar...

  7. Production Wells At Lightning Dock Geothermal Area (Cyrq Energy...

    Open Energy Info (EERE)

    Cyrq Energy, 2014) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Production Wells At Lightning Dock Geothermal Area (Cyrq Energy, 2014)...

  8. Well Placement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Well Placement Well Placement LANL maintains an extensive groundwater monitoring and surveillance program through sampling. August 1, 2013 Finished groundwater well head with solar power Finished groundwater well head with solar power How does LANL determine where to put a monitoring well? Project teams routinely review groundwater monitoring data to verify adequate placement of wells and to plan the siting of additional wells as needed. RELATED IMAGES

  9. Productivity and injectivity of horizontal wells. Quarterly report...

    Office of Scientific and Technical Information (OSTI)

    99 MATHEMATICS, COMPUTERS, INFORMATION SCIENCE, MANAGEMENT, LAW, MISCELLANEOUS; OIL WELLS; DAMAGE; WELL DRILLING; WELL COMPLETION; EQUATIONS; PROGRESS REPORT This report...

  10. U.S. Geothermal Completes Second Successful Production Well at...

    Open Energy Info (EERE)

    Project Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: U.S. Geothermal Completes Second Successful Production Well at Neal Hot Springs Project...

  11. Further discussion of productivity of a horizontal well

    SciTech Connect (OSTI)

    Suprunowicz, R.; Butler, R.M. )

    1993-05-01

    This paper is presented as a comment to an earlier paper entitled Productivity of a Horizontal Well' (Nov. 1992, SPE Reservoir Engineering). These authors attempt to refute the original authors conclusions regarding pressure gradients and boundary conditions in horizontal wells. These authors state that the pressure gradient proposed in the original paper which was parallel to the well bore and was required to maintain constant-flux distribution, are large and unrealistic. They also discuss the use of steady-state and pseudo-steady-state flow models and the interpretation of model results to help predict productivity.

  12. Transient productivity index for numerical well test simulations

    SciTech Connect (OSTI)

    Blanc, G.; Ding, D.Y.; Ene, A.

    1997-08-01

    The most difficult aspect of numerical simulation of well tests is the treatment of the Bottom Hole Flowing (BHF) Pressure. In full field simulations, this pressure is derived from the Well-block Pressure (WBP) using a numerical productivity index which accounts for the grid size and permeability, and for the well completion. This productivity index is calculated assuming a pseudo-steady state flow regime in the vicinity of the well and is therefore constant during the well production period. Such a pseudo-steady state assumption is no longer valid for the early time of a well test simulation as long as the pressure perturbation has not reached several grid-blocks around the well. This paper offers two different solutions to this problem: (1) The first one is based on the derivation of a Numerical Transient Productivity Index (NTPI) to be applied to Cartesian grids; (2) The second one is based on the use of a Corrected Transmissibility and Accumulation Term (CTAT) in the flow equation. The representation of the pressure behavior given by both solutions is far more accurate than the conventional one as shown by several validation examples which are presented in the following pages.

  13. Thermodynamic behavior of gas in storage cavities and production wells

    SciTech Connect (OSTI)

    Hugout, B.

    1982-01-01

    A computer model predicts the performance of gas storage in salt cavities in terms of the volume of cavity that is available for the gas and the pressure and temperature within the cavity and at all points of the production well. The model combines a simplified estimate of volume (derived from studies of rock mechanics) with two thermodynamic models - one for the cavity, the other for the well. Designed specifically for single-phase flow, the model produces values that agree well with measured data.

  14. Productivity and injectivity of horizontal wells. Quarterly report...

    Office of Scientific and Technical Information (OSTI)

    Subject: 02 PETROLEUM; 99 MATHEMATICS, COMPUTERS, INFORMATION SCIENCE, MANAGEMENT, LAW, MISCELLANEOUS; OIL WELLS; DAMAGE; WELL DRILLING; WELL COMPLETION; EQUATIONS; PROGRESS REPORT ...

  15. Method and apparatus for stimulating oil well production

    SciTech Connect (OSTI)

    Brieger, E.F.

    1981-08-25

    A system for cleaning perforations in a well bore where the perforations are located below a packer means on a production tubing. A tool on a string of pipe has packer means for sealing off the cross-section of the production tubing and the pressure in the annulus between the string of pipe and production tubing is reduced. The tool has a bypass passage across the packer means which opens upon the reaching of a predetermined pressure across the packer means and the high volume pressure from the earth formations suddenly flows through the tool and cleaning of the perforations is effected.

  16. Monitoring well

    DOE Patents [OSTI]

    Hubbell, J.M.; Sisson, J.B.

    1999-06-29

    A monitoring well is described which includes: a conduit defining a passageway, the conduit having a proximal and opposite, distal end; a coupler connected in fluid flowing relationship with the passageway; and a porous housing borne by the coupler and connected in fluid flowing relation thereto. 8 figs.

  17. Monitoring well

    DOE Patents [OSTI]

    Hubbell, Joel M.; Sisson, James B.

    1999-01-01

    A monitoring well including a conduit defining a passageway, the conduit having a proximal and opposite, distal end; a coupler connected in fluid flowing relationship with the passageway; and a porous housing borne by the coupler and connected in fluid flowing relation thereto.

  18. Monitoring well

    DOE Patents [OSTI]

    Hubbell, Joel M.; Sisson, James B.

    2002-01-01

    The present invention relates to a monitoring well which includes an enclosure defining a cavity and a water reservoir enclosed within the cavity and wherein the reservoir has an inlet and an outlet. The monitoring well further includes a porous housing borne by the enclosure and which defines a fluid chamber which is oriented in fluid communication with the outlet of the reservoir, and wherein the porous housing is positioned in an earthen soil location below-grade. A geophysical monitoring device is provided and mounted in sensing relation relative to the fluid chamber of the porous housing; and a coupler is selectively moveable relative to the outlet of reservoir to couple the porous housing and water reservoir in fluid communication. An actuator is coupled in force transmitting relation relative to the coupler to selectively position the coupler in a location to allow fluid communication between the reservoir and the fluid chamber defined by the porous housing.

  19. Well pump

    DOE Patents [OSTI]

    Ames, Kenneth R.; Doesburg, James M.

    1987-01-01

    A well pump includes a piston and an inlet and/or outlet valve assembly of special structure. Each is formed of a body of organic polymer, preferably PTFE. Each includes a cavity in its upper portion and at least one passage leading from the cavity to the bottom of the block. A screen covers each cavity and a valve disk covers each screen. Flexible sealing flanges extend upwardly and downwardly from the periphery of the piston block. The outlet valve block has a sliding block and sealing fit with the piston rod.

  20. Controlling formation fines at their sources to maintain well productivity

    SciTech Connect (OSTI)

    Nguyen, P.D.; Weaver, J.D.; Rickman, R.D.; Dusterhoft, R.G.; Parker, M.A.

    2007-05-15

    Migration of formation fines has been shown to cause production decline in many wells. Despite the availability of new downhole tools for use in well stimulation and completion, the ability to sustain desired production levels is often plagued with fines migration problems. The solution to this problem is appropriate treatment to mitigate fines migration at its source. This paper describes the use of an ultra-thin tackifying agent (UTTA) for stabilizing fines in high-rate producing or injection wells. This UTTA is applied as part of an initial prepad in fracturing or gravel-packing operations, as a remedial treatment, or as a post-treatment following acid fracturing or matrix acidizing treatments. The primary purpose of UTTA application is to immobilize formation fines so that they will not detach, migrate with flowing fluids, plug the pore channels, and reduce the flow path permeability. Results of laboratory testing indicate that the UTTA system is applicable to most types of formation fines, including coals, sandstones, and carbonates. Once injected into the formation matrix or proppant pack, the UTTA forms a thin film on formation surfaces, encapsulating the fines. Capillary action helps pull the tackifier into the contact points, fixing the particulate in place without plugging the pore throat. The UTTA does not require a shut-in time after its application. The thin film tackifier does not harden, but remains flexible, enhancing the ability of a formation to withstand stress cycling and allowing the formation to handle high shear stress during high flow rates.

  1. Cerro Prieto cold water injection: effects on nearby production wells

    SciTech Connect (OSTI)

    Truesdell, A.H.; Lippmann, M.J.; De Leon, J.; Rodriguez, M.H.

    1999-07-01

    The liquid-dominated Cerro Prieto geothermal field of northern Baja California, Mexico has been under commercial exploitation since 1973. During the early years of operation, all waste brines were sent to an evaporation pond built west of the production area. In 1989, cooled pond brines began to be successfully injected into the reservoir along the western boundary of the geothermal system. The injection rate varied over the years, and is at present about 20% of the total fluid extracted. As expected under the continental desert conditions prevailing in the area, the temperature and salinity of the pond brines change with the seasons, being higher during the summer and lower during the winter. The chemistry of pond brines is also affected by precipitation of silica, oxidation of H{sub 2}S and reaction with airborne clays. Several production wells in the western part of the field (CP-I area) showed beneficial effects from injection. The chemical (chloride, isotopic) and physical (enthalpy, flow rate) changes observed in producers close to the injectors are reviewed. Some wells showed steam flow increases, in others steam flow decline rates flattened. Because of their higher density, injected brines migrated downward in the reservoir and showed up in deep wells.

  2. Production Wells At Lightning Dock Geothermal Area (McCants,...

    Open Energy Info (EERE)

    well for space heating Notes This was a project to use a low flow (25 GPM) well producing water and steam that had historically been difficult to pump. The project was for a space...

  3. Altering Reservoir Wettability to Improve Production from Single Wells

    SciTech Connect (OSTI)

    W. W. Weiss

    2006-09-30

    tests were conducted in an area of the field that has not met production expectations. The dataset on the 23 Phosphoria well surfactant soaks was updated. An analysis of the oil decline curves indicted that 4.5 lb of chemical produced a barrel of incremental oil. The AI analysis supports the adage 'good wells are the best candidates.' The generally better performance of surfactant in the high permeability core laboratory tests supports this observation. AI correlations were developed to predict the response to water-frac stimulations in a tight San Andres reservoir. The correlations maybe useful in the design of Cedar Creek Anticline surfactant soak treatments planned for next year. Nuclear Magnetic Resonance scans of dolomite cores to measure porosity and saturation during the high temperature laboratory work were acquired. The scans could not be correlated with physical measurement using either conventional or AI methods.

  4. Fully Coupled Well Models for Fluid Injection and Production

    SciTech Connect (OSTI)

    White, Mark D.; Bacon, Diana H.; White, Signe K.; Zhang, Z. F.

    2013-08-05

    Wells are the primary engineered component of geologic sequestration systems with deep subsurface reservoirs. Wells provide a conduit for injecting greenhouse gases and producing reservoirs fluids, such as brines, natural gas, and crude oil, depending on the target reservoir. Well trajectories, well pressures, and fluid flow rates are parameters over which well engineers and operators have control during the geologic sequestration process. Current drilling practices provided well engineers flexibility in designing well trajectories and controlling screened intervals. Injection pressures and fluids can be used to purposely fracture the reservoir formation or to purposely prevent fracturing. Numerical simulation of geologic sequestration processes involves the solution of multifluid transport equations within heterogeneous geologic media. These equations that mathematically describe the flow of fluid through the reservoir formation are nonlinear in form, requiring linearization techniques to resolve. In actual geologic settings fluid exchange between a well and reservoir is a function of local pressure gradients, fluid saturations, and formation characteristics. In numerical simulators fluid exchange between a well and reservoir can be specified using a spectrum of approaches that vary from totally ignoring the reservoir conditions to fully considering reservoir conditions and well processes. Well models are a numerical simulation approach that account for local conditions and gradients in the exchange of fluids between the well and reservoir. As with the mathematical equations that describe fluid flow in the reservoir, variation in fluid properties with temperature and pressure yield nonlinearities in the mathematical equations that describe fluid flow within the well. To numerically simulate the fluid exchange between a well and reservoir the two systems of nonlinear multifluid flow equations must be resolved. The spectrum of numerical approaches for resolving

  5. Fiber optic penetrator for offshore oil well exploration and production

    SciTech Connect (OSTI)

    Collins, J.C.; Warner, C.P.; Henkener, J.A.; Glauser, R.

    1986-07-01

    A fiber optic penetrator arrangement is described for an undersea wall structure of offshore oil well production apparatus, comprising: a. a generally cylindrical housing; b. a cofferdam associated with the undersea production apparatus and defining a generally cylindrical entrance port into which the penetrator is designed to be inserted and mounted; c. a sealing means for sealing the penetrator relative to the entrance port after insertion of the penetrator therein; d. an external bulkhead; e. a second bulkhead positioned internally of the external bulkead; f. a compression spring normally retaining the second bulkhead in a sealed position with the penetrator, the compressing spring being compressed between the second bulkhead and the external bulkhead; g. a breakaway connection affixed to the external bulkhead for coupling an optical fiber transmission cable to the external bulkhead, such that if the transmission cable is snagged or pulled, the external bulkhead will sever along with the breakaway connection so that the penetrator is not pulled from the cofferdam entrance port, the second bulkhead being held in position by ambient water pressure to become the primary bulkhead after the external bulkhead is severed.

  6. Table 6.4 Natural Gas Gross Withdrawals and Natural Gas Well Productivity, 1960-2011

    U.S. Energy Information Administration (EIA) Indexed Site

    Natural Gas Gross Withdrawals and Natural Gas Well Productivity, 1960-2011 Year Natural Gas Gross Withdrawals From Crude Oil, Natural Gas, Coalbed, and Shale Gas Wells Natural Gas Well Productivity Texas 1 Louisiana 1 Oklahoma Other States 1 Federal Gulf of Mexico 2 Total Onshore Offshore Total Gross With- drawals From Natural Gas Wells 3 Producing Wells 4 Average Productivity Federal State Total Million Cubic Feet Million Cubic Feet Million Cubic Feet Number Cubic Feet per Well 1960 6,964,900

  7. Oil well standing valve

    SciTech Connect (OSTI)

    Holland, R. A.; Brennan, J. R.; Christ, F. C.; Petrie, H. L.

    1985-05-28

    A standing valve which may be retrievably mounted in a well production tubing and will allow the maximum possible fluid flow and also allow the valve to be easily drained and retrieved through the well production tubing. The seal between the standing valve and the bottom hole assembly is located at or below the level of the seat and fluid from the top of the valve into the well is drained through the seat.

  8. Geothermal well stimulation program

    SciTech Connect (OSTI)

    Hanold, R.J.

    1982-01-01

    The stimulation of geothermal production wells presents some new and challenging problems. Formation temperatures in the 275 to 550/sup 0/F range can be expected and the behavior of fracturing fluids and fracture proppants at these temperatures in a hostile brine environment must be carefully evaluated in laboratory tests. To avoid possible damage to the producing horizon of the formation, the high-temperature chemical compatibility between the in situ materials and the fracturing fluids, fluid loss additives, and proppants must be verified. In geothermal wells, the necessary stimulation techniques are required to be capable of initiating and maintaining the flow of very large amounts of fluid. This necessity for high flow rates represents a significant departure from conventional oil field stimulation. The objective of well stimulation is to initiate and maintain additional fluid production from existing wells at a lower cost than either drilling new replacement wells or multiply redrilling existing wells. The economics of well stimulation will be vastly enhanced when proven stimulation techniques can be implemented as part of the well completion (while the drilling rig is still over the hole) on all new wells exhibiting some form of flow impairment. Results from 7 stimulation tests are presented and planned tests are described.

  9. Monitoring Well Placement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Monitoring Well Placement Monitoring Well Placement Monitoring wells are designed and placed to define groundwater flow and water quality below the surface. August 1, 2013 Topographic map showing placement of monitoring wells Topographic map showing placement of monitoring wells

  10. Penrose Well Temperatures

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Christopherson, Karen

    2013-03-15

    Penrose Well Temperatures Geothermal waters have been encountered in several wells near Penrose in Fremont County, Colorado. Most of the wells were drilled for oil and gas exploration and, in a few cases, production. This ESRI point shapefile utilizes data from 95 wells in and around the Penrose area provided by the Colorado Oil and Gas Conservation Commission (COGCC) database at http://cogcc.state.co.us/ . Temperature data from the database were used to calculate a temperature gradient for each well. This information was then used to estimate temperatures at various depths. Projection: UTM Zone 13 NAD27 Extent: West -105.224871 East -105.027633 North 38.486269 South 38.259507 Originators: Colorado Oil and Gas Conservation Commission (COGCC) Karen Christopherson

  11. Monitoring Well Placement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Monitoring Well Placement Monitoring Well Placement Monitoring wells are designed and placed to define groundwater flow and water quality below the surface. August 1, 2013...

  12. Well Placement Decision Process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Well Placement Decision Process Well Placement Decision Process Determining where to place a well is a multi-step process. August 1, 2013 Investigation process for determining where to place a sentinel well Investigation process for determining where

  13. Nevada Production and Injection Well Data for Facilities with Flash Steam

    Office of Scientific and Technical Information (OSTI)

    Plants (Dataset) | SciTech Connect Dataset: Nevada Production and Injection Well Data for Facilities with Flash Steam Plants Citation Details In-Document Search Title: Nevada Production and Injection Well Data for Facilities with Flash Steam Plants Files contain a summary of the production and injection data submitted by the geothermal operators to the Nevada Bureau of Mines and Geology over the period from 1985 thru 2009 Authors: Mines, Greg Publication Date: 2014-03-26 OSTI Identifier:

  14. Geothermal Well Stimulation

    SciTech Connect (OSTI)

    Campbell, D. A.; Morris, C. W.; Sinclair, A. R.; Hanold, R. J.; Vetter, O. J.

    1981-03-01

    The stimulation of geothermal wells presents some new and challenging problems. Formation temperatures in the 300-600 F range can be expected. The behavior of stimulation fluids, frac proppants, and equipment at these temperatures in a hostile brine environment must be carefully evaluated before performance expectations can be determined. In order to avoid possible damage to the producing horizon of the formation, high temperature chemical compatibility between the in situ materials and the stimulation materials must be verified. Perhaps most significant of all, in geothermal wells the required techniques must be capable of bringing about the production of very large amounts of fluid. This necessity for high flow rates represents a significant departure from conventional petroleum well stimulation and demands the creation of very high near-wellbore permeability and/or fractures with very high flow conductivity.

  15. UAC Rule R655-1 Wells Used for the Discovery and Production of...

    Open Energy Info (EERE)

    UAC Rule R655-1 Wells Used for the Discovery and Production of Geothermal Energy in the State of Utah Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal...

  16. T-F and S/DOE Gladys McCall No. 1 well, Cameron Parish, Louisiana. Geopressured-geothermal well report, Volume II. Well workover and production testing, February 1982-October 1985. Final report. Part 1

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    The T-F and S/DOE Gladys McCall No. 1 well was the fourth in a series of wells in the DOE Design Wells Program that were drilled into deep, large geopressured-geothermal brine aquifers in order to provide basic data with which to determine the technological and economic viability of producing energy from these unconventional resources. This brine production well was spudded on May 27, 1981 and drilling operations were completed on November 2, 1981 after using 160 days of rig time. The well was drilled to a total depth of 16,510 feet. The target sands lie at a depth of 14,412 to 15,860 feet in the Fleming Formation of the lower Miocene. This report covers well production testing operations and necessary well workover operations during the February 1982 to October 1985 period. The primary goals of the well testing program were: (1) to determine reservoir size, shape, volume, drive mechanisms, and other reservoir parameters, (2) to determine and demonstrate the technological and economic viability of producing energy from a geopressured-geothermal brine aquifer through long-term production testing, and (3) to determine problem areas associated with such long-term production, and to develop solutions therefor.

  17. Models for geothermal wells

    SciTech Connect (OSTI)

    Michaelides, E.E.

    1980-06-01

    The problem of two-phase flow pressure loss is examined in order to give an answer to the problem of determination of the wellhead conditions. For this purpose two models have been developed, the first based on the pattern structure of the flow and the second on the mixing length theory. The void fraction correlations and the transition conditions are presented in the first model as a means of estimating the pressure loss. Heat losses, and the effect of impurities are examined in detail. An expression for the critical flow conditions is also derived. The model is used to predict the available power at the wellhead under various conditions and an answer to the problem of well pumping is given. For the second model an outline of the mixing length theory and the boundary layer coordinates is given; a density distribution in the geothermal well is assumed and the equations for the pressure loss are derived by means of the entropy production function. Finally a comparison of the two models is made and their predictive power is tested against known well data. A brief comparison with the Denver Research Institute is also made.

  18. BUFFERED WELL FIELD OUTLINES

    U.S. Energy Information Administration (EIA) Indexed Site

    OIL & GAS FIELD OUTLINES FROM BUFFERED WELLS The VBA Code below builds oil & gas field boundary outlines (polygons) from buffered wells (points). Input well points layer must be a feature class (FC) with the following attributes: Field_name Buffer distance (can be unique for each well to represent reservoirs with different drainage radii) ...see figure below. Copy the code into a new module. Inputs: In ArcMap, data frame named "Task 1" Well FC as first layer (layer 0). Output:

  19. Methods for obtaining well-to-well flow communication

    SciTech Connect (OSTI)

    Harmon, R.A.; Wahl, H.A.

    1988-07-05

    A process is described for reducing uneven areal sweep of injection fluid in a well pattern having a central injection well surrounded by production wells, all of the wells being communicated by a fracture, comprising: (a) injecting fracturing fluid containing a proppant material into the central injection well and into the fracture to prop the fracture adjacent the injection well; (b) simultaneous with step (a), injecting fluid into one or more of the production wells toward which it is desired to reduce the flow of injection fluid, thereby causing a greater portion of the proppant material to be placed in the fracture adjacent the central injection well in directions away from the one or more of the production wells toward which it is desired to reduce the flow of injection fluid; and (c) thereby subsequently reducing uneven areal sweep of injection fluid injected into the central injection well at rates and pressures below those required to part the fracture.

  20. Production optimization of sucker rod pumping wells producing viscous oil in Boscan field, Venezuela

    SciTech Connect (OSTI)

    Guirados, C.; Sandoval, J.; Rivas, O.; Troconis, H.

    1995-12-31

    Boscan field is located in the western coast of Maracaibo lake and is operated by Maraven S.A., affiliate of Petroleos de Venezuela S.A. It has 315 active wells, 252 of which are produced with sucker rod pumping. Other artificial lift methods currently applied in this field are hydraulic (piston) pumping (39 wells) and ESP (24 wells). This paper presents the results of the production optimization of two sucker rod pumping wells of Boscan field producing viscous oil. This optimization has been possible due to the development of a new production scheme and the application of system analysis in completion design. The new production scheme involves the utilization of a subsurface stuffing box assembly and a slotted housing, both designed and patented by Intevep S.A., affiliate of Petroleos de Venezuela S.A. The completion design method and software used in the optimization study were also developed by Intevep S.A. The new production scheme and design method proved to be effective in preventing the causes of the above mentioned problems, allowing the increase of oil production under better operating conditions.

  1. Well Log ETL tool

    Energy Science and Technology Software Center (OSTI)

    2013-08-01

    This is an executable python script which offers two different conversions for well log data: 1) Conversion from a BoreholeLASLogData.xls model to a LAS version 2.0 formatted XML file. 2) Conversion from a LAS 2.0 formatted XML file to an entry in the WellLog Content Model. Example templates for BoreholeLASLogData.xls and WellLogsTemplate.xls can be found in the package after download.

  2. T-F and S/DOE Gladys McCall No. 1 well, Cameron Parish, Louisiana. Geopressured-geothermal well report, Volume II. Well workover and production testing, February 1982-October 1985. Final report. Appendices 1-7

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    These appendices contain the following reports: (1) investigation of coupling failure from the Gladys McCall No. 1 well; (2) failure analysis - oil well casing coupling; (3) technical remedial requirements for 5-inch production tubing string; (4) reservoir limit test data for sand zone No. 9; (5) reservoir fluid study - sand zone No. 9; (6) engineering interpretation of exploration drawdown tests; and (7) reservoir analysis. (ACR)

  3. Horizontal well replaces hydraulic fracturing in North Sea gas well

    SciTech Connect (OSTI)

    Reynolds, D.A.; Seymour, K.P. )

    1991-11-25

    This paper reports on excessive water production from hydraulically fractured wells in a poor quality reservoir in the North SEa which prompted the drilling of a horizontal well. Gas production from the horizontal well reached six times that of the offset vertical wells, and no water production occurred. This horizontal well proved commercial the western section of the Anglia field. Horizontal drilling in the North SEa is as an effective technology to enhance hydrocarbon recovery from reservoirs that previously had proven uncommercial with other standard techniques. It is viable for the development of marginal reservoirs, particularly where conditions preclude stimulation from hydraulic fracturing.

  4. Isobaric groundwater well

    DOE Patents [OSTI]

    Hubbell, Joel M.; Sisson, James B.

    1999-01-01

    A method of measuring a parameter in a well, under isobaric conditions, including such parameters as hydraulic gradient, pressure, water level, soil moisture content and/or aquifer properties the method as presented comprising providing a casing having first and second opposite ends, and a length between the ends, the casing supporting a transducer having a reference port; placing the casing lengthwise into the well, second end first, with the reference port vented above the water table in the well; and sealing the first end. A system is presented for measuring a parameter in a well, the system comprising a casing having first and second opposite ends, and a length between the ends and being configured to be placed lengthwise into a well second end first; a transducer, the transducer having a reference port, the reference port being vented in the well above the water table, the casing being screened across and above the water table; and a sealing member sealing the first end. In one embodiment, the transducer is a tensiometer transducer and in other described embodiments, another type transducer is used in addition to a tensiometer.

  5. Improving Well Productivity Based Modeling with the Incorporation of Geologic Dependencies

    U.S. Energy Information Administration (EIA) Indexed Site

    Improving Well Productivity Based Modeling with the Incorporation of Geologic Dependencies Troy Cook and Dana Van Wagener October 14, 2014 Independent Statistics & Analysis www.eia.gov U.S. Energy Information Administration Washington, DC 20585 This paper is released to encourage discussion and critical comment. The analysis and conclusions expressed here are those of the authors and not necessarily those of the U.S. Energy Information Administration. WORKING PAPER SERIES October 2014 Tony

  6. Connecticut Wells | Open Energy Information

    Open Energy Info (EERE)

    Zip: 6751 Sector: Geothermal energy Product: A Connecticut-based geothermal heat pump installer and well driller. Coordinates: 40.04446, -80.690839 Show Map Loading...

  7. Horizontal well planning

    SciTech Connect (OSTI)

    Schuh, F.J. )

    1991-03-01

    Interest in horizontal drilling has exploded at a rate well above even the most optimistic projections. Certainly, this technique will not end with the Bakken and Austin Chalk plays. However, future reservoirs will undoubtedly require much more complicated well designs and multi-disciplined technical interaction than has been used so far. The horizontal drilling costs are too high to permit resolving of all the technical issues by trial and error. A multi-disciplinary team approach will be required in order for horizontal drilling to achieve its economic potential.

  8. Thermal indicator for wells

    DOE Patents [OSTI]

    Gaven, Jr., Joseph V.; Bak, Chan S.

    1983-01-01

    Minute durable plate-like thermal indicators are employed for precision measuring static and dynamic temperatures of well drilling fluids. The indicators are small enough and sufficiently durable to be circulated in the well with drilling fluids during the drilling operation. The indicators include a heat resistant indicating layer, a coacting meltable solid component and a retainer body which serves to unitize each indicator and which may carry permanent indicator identifying indicia. The indicators are recovered from the drilling fluid at ground level by known techniques.

  9. Regional long-term production modeling from a single well test, Mount Elbert Gas Hydrate Stratigraphic Test Well, Alaska North Slope

    SciTech Connect (OSTI)

    Anderson, Brian J.; Kurihara, Masanori; White, Mark D.; Moridis, George J.; Wilson, Scott J.; Pooladi-Darvish, Mehran; Gaddipati, Manohar; Masuda, Yoshihiro; Collett, Timothy S.; Hunter, Robert B.; Narita, Hideo; Rose, Kelly; Boswell, Ray

    2011-02-01

    Following the results from the open-hole formation pressure response test in the BPXA-DOE-USGS Mount Elbert Gas Hydrate Stratigraphic Test Well (Mount Elbert well) using Schlumberger's Modular Dynamics Formation Tester (MDT) wireline tool, the International Methane Hydrate Reservoir Simulator Code Comparison project performed long-term reservoir simulations on three different model reservoirs. These descriptions were based on 1) the Mount Elbert gas hydrate accumulation as delineated by an extensive history-matching exercise, 2) an estimation of the hydrate accumulation near the Prudhoe Bay L-pad, and 3) a reservoir that would be down-dip of the Prudhoe Bay L-pad and therefore warmer and deeper. All of these simulations were based, in part, on the results of the MDT results from the Mount Elbert Well. The comparison group's consensus value for the initial permeability of the hydrate-filled reservoir (k = 0.12 mD) and the permeability model based on the MDT history match were used as the basis for subsequent simulations on the three regional scenarios. The simulation results of the five different simulation codes, CMG STARS, HydrateResSim, MH-21 HYDRES, STOMP-HYD, and TOUGH+HYDRATE exhibit good qualitative agreement and the variability of potential methane production rates from gas hydrate reservoirs is illustrated. As expected, the predicted methane production rate increased with increasing in situ reservoir temperature; however, a significant delay in the onset of rapid hydrate dissociation is observed for a cold, homogeneous reservoir and it is found to be repeatable. The inclusion of reservoir heterogeneity in the description of this cold reservoir is shown to eliminate this delayed production. Overall, simulations utilized detailed information collected across the Mount Elbert reservoir either obtained or determined from geophysical well logs, including thickness (37 ft), porosity (35%), hydrate saturation (65%), intrinsic permeability (1000 mD), pore water

  10. Well Testing Techniques | Open Energy Information

    Open Energy Info (EERE)

    Well tests are conducted to quantify well characteristics, production potential, and reservoir properties. Well tests are essential for exploration and production drilling,...

  11. Acid-sludge characterization and remediation improve well productivity and save costs in the Permian Basin

    SciTech Connect (OSTI)

    Wong, T.C.; Hwang, R.J.; Beaty, D.W.; Dolan, J.D.; McCarty, R.A.; Franzen, A.L.

    1997-02-01

    Many oil wells in the Permian Basin have reported sludging problems associated with acid stimulations. The acid sludge is similar among wells and was identified as a viscous emulsion stabilized by asphaltene-rich organic solids. The sludging tendency of the oil increased with the concentrations of asphaltenes and resins, base number of the oil, and ferric ion content in the acid. Only three out of nine commercial acid systems tested were effective in preventing acid-sludge formation; they all use the same novel iron control technology, i.e., catalytic reduction of ferric ions. Several commercial and generic solvent systems were effective in dissolving acid sludge, including mixtures of an aromatic solvent (e.g., xylene) with either isopropyl alcohol (2:1 volume ratio), or ethylene glycol-monobutylether (EGMBE) (2:1 to 3:1 volume ratios). Selection of acid formulations and solvent systems was based on cost effectiveness and operation safety. Field implementation proved successful. If the results of this study had been implemented earlier in the lives of some of the Permian Basin properties, the recovery of 574 BOPD of lost or deferred production from 99 wells could have been realized. This would have resulted in an estimated increased revenue of over US $3 million in 1 year.

  12. City of North Bonneville, Washington: Geothermal Exploration Project, production test well, Phase II. Final report

    SciTech Connect (OSTI)

    Not Available

    1982-06-01

    Based on discussions with the City of North Bonneville, the production test well was drilled to a depth that would also explore for ground water temperatures near 130/sup 0/F (54.4/sup 0/C). Depth projections to a 130/sup 0/F bottom hole temperature were made by assuming a constant ground water temperature rise greater than 50/sup 0/C per kilometer, and by assuming that essentially homogeneous or equivalent conductive rock units would be encountered. Minimum water production requirements were not set, although the City determined that about 800 gpm would be acceptable. Large upper casing diameters of 16 and 12 inches were installed in order to provide the future use of either a vertical turbine or submersible pump, as desired by the city. The scope of work included interpretation of well characteristics, evaluation of ground water as a geothermal resource, geologic analysis of data from drilling and testing, drilling supervision, daily drilling cost accounting, and preparation of a final report. The report includes geologic evaluation of the drilling and test data, ground water and geothermal potential.

  13. Abandoning wells working group

    SciTech Connect (OSTI)

    1997-03-01

    The primary objective of this working group is to identify major technical, regulatory, and environmental issues that are relevant to the abandonment of offshore wellbores. Once the issues have been identified, the working group also has the objective of making recommendations or providing potential solutions for consideration. Areas for process improvement will be identified and {open_quotes}best practices{close_quotes} will be discussed and compared to {open_quotes}minimum standards.{close_quotes} The working group will primarily focus on wellbore abandonment in the Gulf of Mexico. However, workshop participants are encouraged to discuss international issues which may be relevant to wellbore abandonment practices in the Gulf of Mexico. The Abandoning Wells Group has identified several major areas for discussion that have concerns related to both operators and service companies performing wellbore abandonments in the Gulf of Mexico. The following broad topics were selected for the agenda: (1) MMS minimum requirements and state regulations. (2) Co-existence of best practices, new technology, and P & A economics. (3) Liability and environmental issues relating to wellbore abandonment.

  14. Horizontal Wells to Enhance Production in the Bottle Rock Field - Final Report - 09/30/2000 - 02/01/2001

    SciTech Connect (OSTI)

    Cohen, J. H.

    2001-02-26

    This report describes the work that was done to prepare the Phase II proposal for an enhanced geothermal system based on the use of horizontal well to increase production of reservoir fluids from geothermal wells.

  15. Third invitational well-testing symposium: well testing in low...

    Office of Scientific and Technical Information (OSTI)

    session, case histories and related phenomena, well test design in low permeability formations, analysis and interpretation of well test data, and instrumentation for well tests. ...

  16. Single-Well and Cross-Well Seismic At Salt Wells Area (Bureau...

    Open Energy Info (EERE)

    Seismic At Salt Wells Area (Bureau of Land Management, 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Single-Well and Cross-Well Seismic...

  17. Jet pump for oil wells

    SciTech Connect (OSTI)

    Binks, R. H.; Christ, F. C.

    1985-03-12

    A fluid operated pump system which includes power fluid supply means comprising either the annulus between well casing and production tubing, or a secondary tubing, and a production tubing, set in a well, the production tubing having a housing at the lower end with which the power fluid supply means communicates. A pump unit, including a fluid operated jet pump, is movable downwardly through the production tubing into the housing to a fixed location and maintained at the fixed location by the forces of gravity and friction. The pump is operable in the housing by operating fluid under pressure supplied through the power fluid supply means to pump fluid from the well into the production tubing. A cavity is provided at the lower end of the pump unit between two balanced seals. The cavity communicates with the power fluid supply means and with the fluid operated jet pump. Power fluid introduced into the cavity causes no net force to be exerted on the pump unit. When pumping action takes place, produced fluids are taken from a lower pressure area below the pump unit and boosted to a higher pressure area above the pump unit by the fluid operated jet pump, resulting in a net downward force on the pump unit to cause the pump unit to be restrained against its fixed location without the need of latch means.

  18. Exploratory Well At Salt Wells Area (Bureau of Land Management...

    Open Energy Info (EERE)

    Bureau of Land Management, 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Exploratory Well At Salt Wells Area (Bureau of Land Management,...

  19. Well-pump alignment system

    DOE Patents [OSTI]

    Drumheller, Douglas S.

    1998-01-01

    An improved well-pump for geothermal wells, an alignment system for a well-pump, and to a method for aligning a rotor and stator within a well-pump, wherein the well-pump has a whistle assembly formed at a bottom portion thereof, such that variations in the frequency of the whistle, indicating misalignment, may be monitored during pumping.

  20. Pulse Wave Well Development Demonstration

    SciTech Connect (OSTI)

    Burdick, S.

    2001-02-23

    Conventional methods of well development at the Savannah River Site generate significant volumes of investigative derived waste (IDW) which must be treated and disposed of at a regulated Treatment, Storage, or Disposal (TSD) facility. Pulse Wave technology is a commercial method of well development utilizing bursts of high pressure gas to create strong pressure waves through the well screen zone, extending out into the formation surrounding the well. The patented process is intended to reduce well development time and the amount of IDW generated as well as to micro-fracture the formation to improve well capacity.

  1. Well-pump alignment system

    DOE Patents [OSTI]

    Drumheller, D.S.

    1998-10-20

    An improved well-pump for geothermal wells, an alignment system for a well-pump, and to a method for aligning a rotor and stator within a well-pump are disclosed, wherein the well-pump has a whistle assembly formed at a bottom portion thereof, such that variations in the frequency of the whistle, indicating misalignment, may be monitored during pumping. 6 figs.

  2. Nevada Production and Injection Well Data for Facilities with Flash Steam Plants

    SciTech Connect (OSTI)

    Mines, Greg

    2014-03-26

    Files contain a summary of the production and injection data submitted by the geothermal operators to the Nevada Bureau of Mines and Geology over the period from 1985 thru 2009

  3. Nevada Production and Injection Well Data for Facilities with Flash Steam Plants

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Mines, Greg

    Files contain a summary of the production and injection data submitted by the geothermal operators to the Nevada Bureau of Mines and Geology over the period from 1985 thru 2009

  4. Wellness Services | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Wellness Program Workers spend 200 hours per month at work, and keeping a healthy work-life balance is essential. The Headquarters Wellness Program provides support and assistance to DOE employees through a variety of programs and resources geared toward enhancing their mental and physical well-being. Wellness programs include: Accommodations, the Child Development Centers, the Employee Assistance Program (EAP), the Forrestal (FOHO) and Germantown (GOHO) Fitness Centers, the Occupational

  5. Thermal well-test method

    DOE Patents [OSTI]

    Tsang, Chin-Fu; Doughty, Christine A.

    1985-01-01

    A well-test method involving injection of hot (or cold) water into a groundwater aquifer, or injecting cold water into a geothermal reservoir. By making temperature measurements at various depths in one or more observation wells, certain properties of the aquifer are determined. These properties, not obtainable from conventional well test procedures, include the permeability anisotropy, and layering in the aquifer, and in-situ thermal properties. The temperature measurements at various depths are obtained from thermistors mounted in the observation wells.

  6. Wellness Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Wellness Program Workers spend 200 hours per month at work, and keeping a healthy work-life balance is essential. The Headquarters Wellness Program provides support and assistance to DOE employees through a variety of programs and resources geared toward enhancing their mental and physical well-being. Wellness programs include: Accommodations, the Child Development Centers, the Employee Assistance Program (EAP), the Forrestal (FOHO) and Germantown (GOHO) Fitness Centers, the Occupational

  7. Development Wells At Salt Wells Area (Nevada Bureau of Mines...

    Open Energy Info (EERE)

    (Nevada Bureau of Mines and Geology, 2009) Exploration Activity Details Location Salt Wells Geothermal Area Exploration Technique Development Drilling Activity Date 2005 - 2005...

  8. Well having inhibited microbial growth

    DOE Patents [OSTI]

    Lee, Brady D.; Dooley, Kirk J.

    2006-08-15

    The invention includes methods of inhibiting microbial growth in a well. A packing material containing a mixture of a first material and an antimicrobial agent is provided to at least partially fill a well bore. One or more access tubes are provided in an annular space around a casing within the well bore. The access tubes have a first terminal opening located at or above a ground surface and have a length that extends from the first terminal opening at least part of the depth of the well bore. The access tubes have a second terminal opening located within the well bore. An antimicrobial material is supplied into the well bore through the first terminal opening of the access tubes. The invention also includes well constructs.

  9. Establishment of an Industry-Driven Consortium Focused on Improving the Production Performance of Domestic Stripper Wells

    SciTech Connect (OSTI)

    Joel Morrison; Sharon Elder

    2006-01-24

    The Pennsylvania State University, under contract to the U.S. Department of Energy, National Energy Technology Laboratory will establish, promote, and manage a national industry-driven Stripper Well Consortium (SWC) that will be focused on improving the production performance of domestic petroleum and/or natural gas stripper wells. The consortium creates a partnership with the U.S. petroleum and natural gas industries and trade associations, state funding agencies, academia, and the National Energy Technology Laboratory. This report serves as the sixth quarterly technical progress report for the SWC. Key activities for this reporting period included: (1) Organized and hosted two technology transfer meetings; (2) Collaborated with the Pennsylvania Oil and Gas Association (POGAM) to host a Natural Gas Outlook conference in Pittsburgh, PA; (3) Provided a SWC presentation at the Interstate Oil and Gas Compact Commission (IOGCC) meeting in Jackson Hole, WY; and (4) Completed and released a stripper well industry documentary entitled: ''Independent Oil: Rediscovering America's Forgotten Wells''.

  10. Well cleanup and completion apparatus

    SciTech Connect (OSTI)

    Brieger, E.F.

    1984-03-13

    A well cleanup and completion apparatus and technique. A packer is located downhole in a borehole, and a tool string comprising a one-way vent assembly and a one-way circulating valve assembly is connected above a perforating gun. The tool string is used to run the gun downhole through the packer until the gun arrives at a location adjacent to the formation to be perforated. During this time, the packer assembly must be in a configuration which admits flow from the lower to the upper annulus. Cleaning fluid is circulated down the entire tool string to the one-way circulating valve assembly located immediately above the firing head of the gun, thereby displacing fluid from the lower annulus, and cleaning any debris from the gun firing head. The packer is next closed, the gun detonated, whereupon the formation is perforated and production fluid flows through the perforations, up the lower annulus, into the one-way vent assembly located below the packer, into the tubing, and to the surface of the ground. Accordingly, the apparatus enables the gun and the borehole annulus adjacent the gun to be cleaned, thereby assuring that the well is properly completed in a single trip into the wellbore.

  11. Well Monitoring System for EGS

    Broader source: Energy.gov [DOE]

    EGS well monitoring tools offer a unique set of solutions which will lower costs and increase confidence in future geothermal projects.

  12. Remote multiple string well completion

    SciTech Connect (OSTI)

    Kirkland, K.G.

    1981-04-21

    Method and apparatus for multiple string well completions by remote operations in underwater installations, by which the tubing strings are installed independently rather than simultaneously.

  13. Well Deepening | Open Energy Information

    Open Energy Info (EERE)

    can be deepened in order to reach a location with higher flow and temperature. Use in Geothermal Exploration Sometimes wells that were initially not planned for utilization...

  14. Thermal well-test method

    DOE Patents [OSTI]

    Tsang, C.F.; Doughty, C.A.

    1984-02-24

    A well-test method involving injection of hot (or cold) water into a groundwater aquifer, or injecting cold water into a geothermal reservoir is disclosed. By making temperature measurements at various depths in one or more observation wells, certain properties of the aquifer are determined. These properties, not obtainable from conventional well test procedures, include the permeability anisotropy, and layering in the aquifer, and in-situ thermal properties. The temperature measurements at various depths are obtained from thermistors mounted in the observation wells.

  15. Well drilling apparatus and method

    DOE Patents [OSTI]

    Alvis, Robert L.; Newsom, Melvin M.

    1977-01-01

    Well drilling rates may be increased by impelling projectiles to fracture rock formations and drilling with rock drill bits through the projectile fractured rock.

  16. Establishment of an Industry-Driven Consortium Focused on Improving the Production Performance of Domestic Stripper Wells

    SciTech Connect (OSTI)

    Joel L. Morrison; Sharon L. Elder

    2006-05-01

    The Pennsylvania State University, under contract to the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) established a national industry-driven Stripper Well Consortium (SWC) that is focused on improving the production performance of domestic petroleum and/or natural gas stripper wells. The consortium creates a partnership with the U.S. petroleum and natural gas industries and trade associations, state funding agencies, academia, and the National Energy Technology Laboratory. This report serves as the eighth quarterly technical progress report for the SWC. Key activities for this reporting period include: (1) Organize and host the 2006 Spring Meeting in State College, PA to review and select projects for SWC co-funding; (2) Participation in the 2006 PA CleanEnergy Expo Energy Theater to air the DVD on ''Independent Oil: Rediscovering American's Forgotten Wells''; (3) New member additions; (4) Improving communications; and (5) Planning of the fall technology meetings.

  17. Fracture optimization on every well

    SciTech Connect (OSTI)

    Ely, J.W.; Tiner, R.L.

    1998-01-01

    Since hydraulic fracturing was introduced in 1947, significant advances have been made in the area of fracture diagnostics, particularly in the last 20 years. Common diagnostic procedures used today to quantify fracture geometry and fracture fluid efficiency are listed in a table. During the past several years, the most popular procedure was to conduct most or all of the diagnostics on one well in a field, and apply the results to subsequent wells. However, experience has shown that critical factors can change drastically, even in fields with minimal well spacing. Although some variations in relative rock stresses have been seen, rock properties typically remain fairly consistent within a designated area. However, the factor that changes drastically from well to well--even in spacing as small as 10 acres--is fracture fluid efficiency. As much as a 60% change in fluid efficiencies has been noted for offset wells. Because of these variations, a new procedure has been developed in which fracture treatments on individual wells can be optimized on the day of the fracture treatment. The paper describes this fracture optimization procedure.

  18. Geothermal Well Site Restoration and Plug and Abandonment of Wells

    SciTech Connect (OSTI)

    Rinehart, Ben N.

    1994-08-01

    A report is presented on the final phase of an energy research program conducted by the U.S. Department of Energy (DOE) involving two geothermal well sites in the State of Louisiana-the Gladys McCall site and the Willis Hulin site. The research program was intended to improve geothermal technology and to determine the efficacy of producing electricity commercially from geopressured resource sites. The final phase of the program consisted of plug and abandonment (P&A) of the wells and restoration of the well sites. Restoration involved (a) initial soil and water sampling and analysis; (b) removal and disposal of well pads, concrete, utility poles, and trash; (c) plugging of monitor and freshwater wells; and (d) site leveling and general cleanup. Restoration of the McCall site required removal of naturally occurring radioactive material (NORM), which was costly and time-consuming. Exhibits are included that provide copies of work permits and authorizations, P&A reports and procedures, daily workover and current conditions report, and cost and salvage reports. Site locations, grid maps, and photographs are provided.

  19. Well Monitoring Systems for EGS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Our system can stay in the well and operate unmanned for days or years. This reduces cost ... - Once in place, the system can run unmanned (no logging truck) 3 | US DOE ...

  20. Quantum well multijunction photovoltaic cell

    DOE Patents [OSTI]

    Chaffin, R.J.; Osbourn, G.C.

    1983-07-08

    A monolithic, quantum well, multilayer photovoltaic cell comprises a p-n junction comprising a p-region on one side and an n-region on the other side, each of which regions comprises a series of at least three semiconductor layers, all p-type in the p-region and all n-type in the n-region; each of said series of layers comprising alternating barrier and quantum well layers, each barrier layer comprising a semiconductor material having a first bandgap and each quantum well layer comprising a semiconductor material having a second bandgap when in bulk thickness which is narrower than said first bandgap, the barrier layers sandwiching each quantum well layer and each quantum well layer being sufficiently thin that the width of its bandgap is between said first and second bandgaps, such that radiation incident on said cell and above an energy determined by the bandgap of the quantum well layers will be absorbed and will produce an electrical potential across said junction.

  1. Quantum well multijunction photovoltaic cell

    DOE Patents [OSTI]

    Chaffin, Roger J.; Osbourn, Gordon C.

    1987-01-01

    A monolithic, quantum well, multilayer photovoltaic cell comprises a p-n junction comprising a p-region on one side and an n-region on the other side, each of which regions comprises a series of at least three semiconductor layers, all p-type in the p-region and all n-type in the n-region; each of said series of layers comprising alternating barrier and quantum well layers, each barrier layer comprising a semiconductor material having a first bandgap and each quantum well layer comprising a semiconductor material having a second bandgap when in bulk thickness which is narrower than said first bandgap, the barrier layers sandwiching each quantum well layer and each quantum well layer being sufficiently thin that the width of its bandgap is between said first and second bandgaps, such that radiation incident on said cell and above an energy determined by the bandgap of the quantum well layers will be absorbed and will produce an electrical potential across said junction.

  2. GeoWells International | Open Energy Information

    Open Energy Info (EERE)

    Name: GeoWells International Place: Nairobi, Kenya Sector: Geothermal energy, Solar, Wind energy Product: Kenya-based geothermal driller. The company also supplies and installs...

  3. Well completion and servicing fluid

    SciTech Connect (OSTI)

    Grimsley, R.L.

    1990-09-25

    This patent describes a well completion servicing fluid for controlling formation pressure during completion or servicing of a well. It comprises: an aqueous solution of calcium chloride, a solid weighing agent suspended in the solution and being selected from the group consisting of zinc, zinc oxide, and mixtures thereof; and a viscosifier dissolved in the solution in an amount effective to suspend the weighing agent. The fluid has a density of greater than 15 pounds per gallon and being substantially free of bromide ions and being substantially free of solid material which is not soluble in hydrochloric acid.

  4. ADVANCED CEMENTS FOR GEOTHERMAL WELLS

    SciTech Connect (OSTI)

    SUGAMA,T.

    2007-01-01

    Using the conventional well cements consisting of the calcium silicate hydrates (CaO-SiO{sub 2}-H{sub 2}O system) and calcium aluminum silicate hydrates (CaO-Al{sub 2}O{sub 3}-SiO{sub 2}-H{sub 2}O system) for the integrity of geothermal wells, the serious concern confronting the cementing industries was their poor performance in mechanically supporting the metallic well casing pipes and in mitigating the pipe's corrosion in very harsh geothermal reservoirs. These difficulties are particularly acute in two geological regions: One is the deep hot downhole area ({approx} 1700 m depth at temperatures of {approx} 320 C) that contains hyper saline water with high concentrations of CO{sub 2} (> 40,000 ppm) in conjunction with {approx} 100 ppm H{sub 2}S at a mild acid of pH {approx} 5.0; the other is the upper well region between the well's surface and {approx} 1000 m depth at temperatures up to 200 C. The specific environment of the latter region is characterized by highly concentrated H{sub 2}SO{sub 4} (pH < 1.5) brine containing at least 5000 ppm CO{sub 2}. When these conventional cements are emplaced in these harsh environments, their major shortcoming is their susceptibility to reactions with hot CO{sub 2} and H{sub 2}SO4, thereby causing their deterioration brought about by CO{sub 2}-catalyzed carbonation and acid-initiated erosion. Such degradation not only reduced rapidly the strength of cements, lowering the mechanical support of casing pipes, but also increased the extent of permeability of the brine through the cement layer, promoting the rate of the pipe's corrosion. Severely carbonated and acid eroded cements often impaired the integrity of a well in less than one year; in the worst cases, casings have collapsed within three months, leading to the need for costly and time-consuming repairs or redrilling operations. These were the reasons why the geothermal well drilling and cementing industries were concerned about using conventional well cements, and further

  5. ESTABLISHMENT OF AN INDUSTRY-DRIVEN CONSORTIUM FOCUSED ON IMPROVING THE PRODUCTION PERFORMANCE OF DOMESTIC STRIPPER WELLS

    SciTech Connect (OSTI)

    Joel L. Morrison

    2004-12-28

    The Pennsylvania State University, under contract to the U.S. Department of Energy, National Energy Technology Laboratory will establish, promote, and manage a national industry-driven Stripper Well Consortium (SWC) that will be focused on improving the production performance of domestic petroleum and/or natural gas stripper wells. The consortium creates a partnership with the U.S. petroleum and natural gas industries and trade associations, state funding agencies, academia, and the National Energy Technology Laboratory. This report serves as the first quarterly technical progress report for the SWC. Key activities for this reporting period include: (1) hosting the SWC spring proposal meeting in Golden Colorado, (2) planning of the upcoming SWC fall technology transfer meetings, and (3) recruiting the SWC base membership.

  6. ESTABLISHMENT OF AN INDUSTRY-DRIVEN CONSORTIUM FOCUSED ON IMPROVING THE PRODUCTION PERFORMANCE OF DOMESTIC STRIPPER WELLS

    SciTech Connect (OSTI)

    Joel L. Morrison

    2004-12-23

    The Pennsylvania State University, under contract to the U.S. Department of Energy, National Energy Technology Laboratory will establish, promote, and manage a national industry-driven Stripper Well Consortium (SWC) that will be focused on improving the production performance of domestic petroleum and/or natural gas stripper wells. The consortium creates a partnership with the U.S. petroleum and natural gas industries and trade associations, state funding agencies, academia, and the National Energy Technology Laboratory. This report serves as the fifteenth quarterly technical progress report for the SWC. Key activities for this reporting period include: (1) hosting the SWC spring proposal meeting in Golden Colorado, (2) planning of the upcoming SWC fall technology transfer meetings, and (3) recruiting the SWC base membership.

  7. Process for cementing geothermal wells

    DOE Patents [OSTI]

    Eilers, Louis H.

    1985-01-01

    A pumpable slurry of coal-filled furfuryl alcohol, furfural, and/or a low molecular weight mono- or copolymer thereof containing, preferably, a catalytic amount of a soluble acid catalyst is used to cement a casing in a geothermal well.

  8. Remote multiple string well completion

    SciTech Connect (OSTI)

    Kirkland, K.G.

    1981-09-15

    In a remotely installed underwater well apparatus, a tubular body, typically a multiple string tubing hanger, is landed in a position oriented rotationally with respect to a reference point on the apparatus and a seal device is then energized by the same tool employed to land and orient the tubular body.

  9. Technical and economic evaluation of selected compact drill rigs for drilling 10,000 foot geothermal production wells

    SciTech Connect (OSTI)

    Huttrer, G.W.

    1997-11-01

    This report summarizes the investigation and evaluation of several {open_quotes}compact{close_quotes} drill rigs which could be used for drilling geothermal production wells. Use of these smaller rigs would save money by reducing mobilization costs, fuel consumption, crew sizes, and environmental impact. Advantages and disadvantages of currently-manufactured rigs are identified, and desirable characteristics for the {open_quotes}ideal{close_quotes} compact rig are defined. The report includes a detailed cost estimate of a specific rig, and an evaluation of the cost/benefit ratio of using this rig. Industry contacts for further information are given.

  10. Induced fractures: well stimulation through fracturing

    SciTech Connect (OSTI)

    Hanold, R.J.

    1982-01-01

    Seven fracture stimulation treatments were planned and executed under the Department of Energy-funded Geothermal Well Stimulation Program. The objective of this program is to demonstrate that geothermal well stimulation offers a technical alternative to additional well drilling and redrilling for productivity enhancement which can substantially reduce development costs. Well stimulation treatments have been performed at Raft River, Idaho; East Mesa, California; The Geysers, California; and the Baca Project Area in New Mexico. Six of the seven stimulation experiments were technically successful in stimulating the wells. The two fracture treatments in East Mesa more than doubled the production rate of the previously marginal producer. The two fracture treatments at Raft River and the two at Baca were all successful in obtaining significant production from previously nonproductive intervals. The acid etching treatment in the well at the Geysers did not have any material effect on production rate.

  11. ESTABLISHMENT OF AN INDUSTRY-DRIVEN CONSORTIUM FOCUSED ON IMPROVING THE PRODUCTION PERFORMANCE OF DOMESTIC STRIPPER WELLS

    SciTech Connect (OSTI)

    Joel L. Morrison

    2004-05-17

    The Pennsylvania State University, under contract to the U.S. Department of Energy, National Energy Technology Laboratory will establish, promote, and manage a national industry-driven Stripper Well Consortium (SWC) that will be focused on improving the production performance of domestic petroleum and/or natural gas stripper wells. The consortium creates a partnership with the U.S. petroleum and natural gas industries and trade associations, state funding agencies, academia, and the National Energy Technology Laboratory. This report serves as the thirteenth quarterly technical progress report for the SWC. Key activities for this reporting period included: (1) hosting three fall technology transfer meetings in Wyoming, Texas, and Pennsylvania, (2) releasing the 2004 SWC request-for-proposal (RFP), and (3) initial planning of the SWC spring meeting in Golden Colorado for selecting the 2004 SWC projects. The Fall technology transfer meetings attracted 100+ attendees between the three workshops. The SWC membership which attended the Casper, Wyoming workshop was able to see several SWC-funded projects operating in the field at the Rocky Mountain Oilfield Testing Center. The SWC is nearing the end of its initial funding cycle. The Consortium has a solid membership foundation and a demonstrated ability to review and select projects that have relevancy to meet the needs of domestic stripper well operators.

  12. ESTABLISHMENT OF AN INDUSTRY-DRIVEN CONSORTIUM FOCUSED ON IMPROVING THE PRODUCTION PERFORMANCE OF DOMESTIC STRIPPER WELLS

    SciTech Connect (OSTI)

    Joel L. Morrison

    2002-08-27

    The Pennsylvania State University, under contract to the U.S. Department of Energy, National Energy Technology Laboratory will establish, promote, and manage a national industry-driven Stripper Well Consortium (SWC) that will be focused on improving the production performance of domestic petroleum and/or natural gas stripper wells. The consortium creates a partnership with the U.S. petroleum and natural gas industries and trade associations, state funding agencies, academia, and the National Energy Technology Laboratory. This report serves as the sixth quarterly technical progress report for the SWC. Key activities for this reporting period include: (1) release of 2002 SWC request-for-proposal, (2) organized and hosted the Spring SWC meeting in Columbus, Ohio for membership proposal presentations and review; (3) tentatively scheduled the 2002 fall technology transfer meeting sites, and (4) continued to recruit additional Consortium members. In addition, a literature search that focuses on the use of lasers, microwaves, and acoustics for potential stripper well applications continued.

  13. ESTABLISHMENT OF AN INDUSTRY-DRIVEN CONSORTIUM FOCUSED ON IMPROVING THE PRODUCTION PERFORMANCE OF DOMESTIC STRIPPER WELLS

    SciTech Connect (OSTI)

    Joel L. Morrison

    2002-09-30

    The Pennsylvania State University, under contract to the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL), has established a national industry-driven Stripper Well Consortium (SWC) that is focused on improving the production performance of domestic petroleum and/or natural gas stripper wells. The consortium creates a partnership with the U.S. petroleum and natural gas industries and trade associations, state funding agencies, academia, and the National Energy Technology Laboratory. This report serves as the second topical report. The SWC has grown and diversified its membership during its first 24 months of existence. The Consortium is now focused on building strategic alliances with additional industrial, state, and federal entities to expand further the SWC membership base and transfer technologies as they are developed. In addition, the Consortium has successfully worked to attract state support to co-fund SWC projects. Penn State has entered a co-funding arrangement with the New York State Energy Development Authority (NYSERDA) which has provided $200,000 over the last two years to co-fund stripper well production-orientated projects that have relevance to New York state producers. During this reporting period, the Executive Council approved co-funding for 14 projects that have a total project value of $2,116,897. Since its inception, the SWC has approved cofunding for 27 projects that have a total project value of $3,632,109.84. The SWC has provided $2,242,701 in co-funding for these projects and programmatically maintains a cost share of 39%.

  14. Use of Biostratigraphy to Increase Production, Reduce Operating Costs and Risks and Reduce Environmental Concerns in Oil Well Drilling

    SciTech Connect (OSTI)

    Edward Marks

    2005-09-09

    In the Santa Maria Basin, Santa Barbara County, California, four wells were processed and examined to determine the age and environment parameters in the oil producing sections. From west to east, we examined Cabot No. 1 Ferrero-Hopkins,from 3917.7 m (12850 ft) to 4032 m (13225 ft); Sun No. 5 Blair, from 3412 m (11190 ft) to 3722.5 m (12210 ft); Triton No. 10 Blair, from 1552 m (5090 ft) to 1863 m (6110 ft); and OTEC No. 1 Boyne, from 2058 m (6750 ft) to 2528 m (8293 ft). Lithic reports with lithic charts were prepared and submitted on each well. These tested for Sisquoc Fm lithology to be found in the Santa Maria area. This was noted in the OTEC No. 1 Boyne interval studied. The wells also tested for Monterey Fm. lithology, which was noted in all four wells examined. Composite samples of those intervals [combined into 9.15 m (30 foot) intervals] were processed for paleontology. Although the samples were very refractory and siliceous, all but one (Sun 5 Blair) yielded index fossil specimens, and as Sun 5 Blair samples below 3686 m (12090 ft) were processed previously, we were able to make identifications that would aid this study. The intervals examined were of the Sisquoc Formation, the Low Resistivity and the High Resistivity sections of the Monterey Formation. The Lower Sisquoc and the top of the late Miocene were identified by six index fossils: Bolivina barbarana, Gyroidina soldanii rotundimargo, Bulimina montereyana, Prunopyle titan, Axoprunum angelinum and Glyphodiscus stellatus. The Low Resistivity Monterey Fm. was identified by eight index fossils, all of which died out at the top of the late Miocene, late Mohnian: Nonion goudkoffi, Brizalina girardensis, Cibicides illingi, Siphocampe nodosaria, Stephanogonia hanzawai, Uvigerina modeloensis, Buliminella brevior, Tytthodiscus sp.and the wide geographic ranging index pelagic fossil, Sphaeroidinellopsis subdehiscens. The High Resistivity Monterey Fm. was identified by eight index fossils, all of which died

  15. Bottom hole oil well pump

    SciTech Connect (OSTI)

    Hansen, J.E.; Hinds, W.E.; Oldershaw, P.V.

    1982-09-21

    A bottom hole well pump is disclosed comprising a pump housing supported by a control cable for raising and lowering the housing within tubing in a well, a linear motor within the housing causing reciprocation of a plunger extending into a pumping chamber formed by the housing with inlet and outlet check valves for controlling flow of oil or other liquid into the pumping chamber and from the pumping chamber into the tubing above the pump housing. In one embodiment, belleville-type springs are employed for storing energy as the plunger approaches its opposite limits of travel in order to initiate movement of the plunger in the opposite direction. In this embodiment, a single pumping chamber is formed above the linear motor with a single-valve block arranged above the pumping chamber and including inlet check valve means for controlling liquid flow into the pumping chamber and outlet check valve means for controlling liquid flow from the pumping chamber into the tubing interior above the pump housing. In another embodiment, pumping chambers are formed above and below the linear motor with a tubular plunger extending into both pumping chambers, in order to achieve pumping during both directions of travel of the plunger.

  16. Ultra Thin Quantum Well Materials

    SciTech Connect (OSTI)

    Dr Saeid Ghamaty

    2012-08-16

    This project has enabled Hi-Z technology Inc. (Hi-Z) to understand how to improve the thermoelectric properties of Si/SiGe Quantum Well Thermoelectric Materials. The research that was completed under this project has enabled Hi-Z Technology, Inc. (Hi-Z) to satisfy the project goal to understand how to improve thermoelectric conversion efficiency and reduce costs by fabricating ultra thin Si/SiGe quantum well (QW) materials and measuring their properties. In addition, Hi-Z gained critical new understanding on how thin film fabrication increases the silicon substrate's electrical conductivity, which is important new knowledge to develop critical material fabrication parameters. QW materials are constructed with alternate layers of an electrical conductor, SiGe and an electrical insulator, Si. Film thicknesses were varied, ranging from 2nm to 10nm where 10 nm was the original film thickness prior to this work. The optimum performance was determined at a Si and SiGe thickness of 4nm for an electrical current and heat flow parallel to the films, which was an important conclusion of this work. Essential new information was obtained on how the Si substrate electrical conductivity increases by up to an order of magnitude upon deposition of QW films. Test measurements and calculations are accurate and include both the quantum well and the substrate. The large increase in substrate electrical conductivity means that a larger portion of the electrical current passes through the substrate. The silicon substrate's increased electrical conductivity is due to inherent impurities and thermal donors which are activated during both molecular beam epitaxy and sputtering deposition of QW materials. Hi-Z's forward looking cost estimations based on future high performance QW modules, in which the best Seebeck coefficient and electrical resistivity are taken from separate samples predict that the electricity cost produced with a QW module could be achieved at <$0.35/W. This price would

  17. Number of Producing Gas Wells

    U.S. Energy Information Administration (EIA) Indexed Site

    Producing Gas Wells Period: Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Area 2009 2010 2011 2012 2013 2014 View History U.S. 493,100 487,627 514,637 482,822 484,994 514,786 1989-2014 Alabama 6,913 7,026 7,063 6,327 6,165 6,118 1989-2014 Alaska 261 269 277 185 159 170 1989-2014 Arizona 6 5 5 5 5 5 1989-2014 Arkansas 6,314 7,397 8,388 8,538 9,843 10,150 1989-2014 California 1,643 1,580 1,308 1,423 1,335 1,118 1989-2014

  18. Coiled tubing velocity strings keep wells unloaded

    SciTech Connect (OSTI)

    Wesson, H.R.; Shursen, J.L.

    1989-07-01

    Liquid loading is a problem in many older and even some newer gas wells, particularly in pressure depletion type reservoirs. This liquid loading results in decreased production and may even kill the well. The use of coiled tubing as a velocity string (or siphon string) has proved to be an economically viable alternative to allow continued and thus, increased cumulative production for wells experiencing liquid loading problems. Coiled tubing run inside the existing production string reduces the flow area, whether the well is produced up the tubing or up the annulus. This reduction in flow area results in an increase in flow velocity and thus, an increase in the well's ability to unload fluids.

  19. Feasibility of EGS Well Control Systems

    SciTech Connect (OSTI)

    Norann, Randy A; Darlow, Richard

    2015-02-03

    This report covers the 8th major objective listed in Grant DE-FG36-08GO18185. This objective takes the information and experience gained from the development of 300°C well monitoring system and applies them to concepts envisioned for future geothermal well control systems supporting EGS power production. This report covers a large number of instrumentation and control system engineering issues for EGS wells while also providing a window into existing technology to address those issues.

  20. Subsea tree cap well choke system

    SciTech Connect (OSTI)

    Bednar, J.M.

    1991-04-30

    This patent describes an apparatus useful in subsea well completions requiring a subsea choke. It comprises: a wellhead connector; a tree flow passage; a tree annulus passage; a tree cap; a choke; and a production line.

  1. Method and apparatus for multiple well completion

    SciTech Connect (OSTI)

    Lawson, J.E.

    1982-06-08

    Method and apparatus for multiple well completion, in which a multiple string tubing hanger or like component is equipped with a gapped flange to accept dependent splines on the handling tool and on the production upper body to establish precise orientation of the production upper body.

  2. Improvements in subsea well technology

    SciTech Connect (OSTI)

    Halvorsen, T.

    1995-12-31

    The next generation subsea developments will be facing a number of new challenges which have to be solved to maintain a cost-efficient solution for production of oil and gas: (1) Smaller fields, i.e. cost reduction through volume will no longer be valid. (2) Freedom in configuration of subsea development. The current idea of standardization will not be directly applicable for cost reduction. (3) Various water depth. The same technology should be applicable for both guideline- and guideline less water depth. (4) Development in new areas of the world where drilling rig deployable system is a must. (5) Various types of fluid processing may be required as an integral part of a subsea production system. The next generation subsea production system should be universal and applicable to any subsea field development. Kongsberg Offshore a.s. (KOS) have gained extensive experience in supplying standardized total subsea systems. The paper presents the approach taken by KOS to develop the next generation subsea system, and discussed the challenges associated with this.

  3. San Bernardino National Wildlife Refuge Well 10

    SciTech Connect (OSTI)

    Ensminger, J.T.; Easterly, C.E.; Ketelle, R.H.; Quarles, H.; Wade, M.C.

    1999-12-01

    The U.S. Geological Survey (USGS), at the request of the U.S. Fish and Wildlife Service, evaluated the water production capacity of an artesian well in the San Bernardino National Wildlife Refuge, Arizona. Water from the well initially flows into a pond containing three federally threatened or endangered fish species, and water from this pond feeds an adjacent pond/wetland containing an endangered plant species.

  4. Spontaneous Potential Well Log | Open Energy Information

    Open Energy Info (EERE)

    Log Chemical Logging Density Log Gamma Log Image Logs Mud Logging Neutron Log Pressure Temperature Log Single-Well and Cross-Well Resistivity Spontaneous Potential Well Log...

  5. Category:Observation Wells | Open Energy Information

    Open Energy Info (EERE)

    Observation Wells Jump to: navigation, search Geothermalpower.jpg Looking for the Observation Wells page? For detailed information on Observation Wells, click here....

  6. Category:Exploratory Well | Open Energy Information

    Open Energy Info (EERE)

    Looking for the Exploratory Well page? For detailed information on Exploratory Well, click here. Category:Exploratory Well Add.png Add a new Exploratory Well Technique Pages in...

  7. Probabilistic model better defines development well risks

    SciTech Connect (OSTI)

    Connolly, M.R.

    1996-10-14

    Probabilistic techniques to compare and rank projects, such as the drilling of development wells, often are more representative than decision tree or deterministic approaches. As opposed to traditional deterministic methods, probabilistic analysis gives decision-makers ranges of outcomes with associated probabilities of occurrence. This article analyzes the drilling of a hypothetical development well with actual field data (such as stabilized initial rates, production declines, and gas/oil ratios) to calculate probabilistic reserves, and production flow streams. Analog operating data were included to build distributions for capital and operating costs. Economics from the Monte Carlo simulation include probabilistic production flow streams and cost distributions. Results include single parameter distributions (reserves, net present value, and profitability index) and time function distributions (annual production and net cash flow).

  8. MARGINAL EXPENSE OIL WELL WIRELESS SURVEILLANCE MEOWS

    SciTech Connect (OSTI)

    Mason M. Medizade; John R. Ridgely; Donald G. Nelson

    2004-11-01

    A marginal expense oil well wireless surveillance system to monitor system performance and production from rod-pumped wells in real time from wells operated by Vaquero Energy in the Edison Field, Main Area of Kern County in California has been successfully designed and field tested. The surveillance system includes a proprietary flow sensor, a programmable transmitting unit, a base receiver and receiving antenna, and a base station computer equipped with software to interpret the data. First, the system design is presented. Second, field data obtained from three wells is shown. Results of the study show that an effective, cost competitive, real-time wireless surveillance system can be introduced to oil fields across the United States and the world.

  9. SW New Mexico Oil Well Formation Tops

    SciTech Connect (OSTI)

    Shari Kelley

    2015-10-21

    Rock formation top picks from oil wells from southwestern New Mexico from scout cards and other sources. There are differing formation tops interpretations for some wells, so for those wells duplicate formation top data are presented in this file.

  10. Industry survey for horizontal wells. Final report

    SciTech Connect (OSTI)

    Wilson, D.D.; Kaback, D.S. [CDM Federal Programs Corp., Denver, CO (United States); Denhan, M.E. [Westinghouse Savannah River Co., Aiken, SC (United States); Watkins, D. [CDM Federal Programs Corp., Aiken, SC (United States)

    1993-07-01

    An international survey of horizontal environmental wells was performed during May and June of 1993. The purpose of the survey was to provide the environmental industry with an inventory of horizontal environmental wells and information pertaining to the extent of the use of horizontal environmental wells, the variety of horizontal environmental well applications, the types of geologic and hydrogeologic conditions within which horizontal environmental wells have been installed, and the companies that perform horizontal environmental well installations. Other information, such as the cost of horizontal environmental well installations and the results of tests performed on the wells, is not complete but is provided as general information with the caveat that the information should not be used to compare drilling companies. The result of the survey is a catalogue of horizontal environmental wells that are categorized by the objective or use of the wells, the vertical depth of the wells, and the drilling company contracted to install the wells.

  11. Single-Well And Cross-Well Seismic Imaging | Open Energy Information

    Open Energy Info (EERE)

    Single-Well And Cross-Well Seismic Imaging (Redirected from Single-Well And Cross-Well Seismic) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique:...

  12. Single-Well And Cross-Well Seismic Imaging | Open Energy Information

    Open Energy Info (EERE)

    Single-Well And Cross-Well Seismic Imaging Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Single-Well And Cross-Well Seismic Imaging Details...

  13. Oregon Modification Application Geothermal Wells Form | Open...

    Open Energy Info (EERE)

    Modification Application Geothermal Wells Form Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Oregon Modification Application Geothermal Wells Form Form...

  14. CNTA_Well_Installation_Report.book

    Office of Legacy Management (LM)

    Well Installation Report for Corrective Action Unit 443, Central Nevada Test Area Nye ... WELL INSTALLATION REPORT FOR CORRECTIVE ACTION UNIT 443, CENTRAL NEVADA TEST AREA NYE ...

  15. Wells Public Utilities - Commercial & Industrial Energy Efficiency...

    Broader source: Energy.gov (indexed) [DOE]

    Commercial Refrigeration Equipment Program Info Sector Name Utility Administrator Wells Public Utilities Website http:www.SaveEnergyInWells.com State Minnesota Program Type...

  16. EPA - UIC Well Classifications | Open Energy Information

    Open Energy Info (EERE)

    Well Classifications Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA - UIC Well Classifications Author Environmental Protection Agency Published...

  17. Countryman Well Greenhouse Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Countryman Well Greenhouse Low Temperature Geothermal Facility Jump to: navigation, search Name Countryman Well Greenhouse Low Temperature Geothermal Facility Facility Countryman...

  18. Hawaii Water Well Temperature and Hydraulic Head

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Nicole Lautze

    2014-12-01

    .csv file consisting of the water well temperature and water table elevation for wells in the State of Hawaii. Data source, Hawaii Commission of Water Resources Management.

  19. Geothermal/Well Field | Open Energy Information

    Open Energy Info (EERE)

    Well Field < Geothermal Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Land Use Planning Leasing Exploration Well Field Power Plant Grid Connection Environment Water...

  20. Salt Wells Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Salt Wells Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Salt Wells Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 2.1 Salt...

  1. Hydrogeologic Site Characterization and Well Testing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratories' Defense Waste Management Programs (DWMP) uses a combination of field systems, software and scientific expertise to perform characterization activities. Capabilities include groundwater testing and hydraulic response analysis to assess and understand subsurface conditions at a particular site or region. Hydrology as part of the Site Characterization Whether you are looking to site a petroleum production well, locate a new business, or select a site for a nuclear repository, a

  2. Interface effect in coupled quantum wells

    SciTech Connect (OSTI)

    Hao, Ya-Fei

    2014-06-28

    This paper intends to theoretically investigate the effect of the interfaces on the Rashba spin splitting of two coupled quantum wells. The results show that the interface related Rashba spin splitting of the two coupled quantum wells is both smaller than that of a step quantum well which has the same structure with the step quantum well in the coupled quantum wells. And the influence of the cubic Dresselhaus spin-orbit interaction of the coupled quantum wells is larger than that of a step quantum well. It demonstrates that the spin relaxation time of the two coupled quantum wells will be shorter than that of a step quantum well. As for the application in the spintronic devices, a step quantum well may be better than the coupled quantum wells, which is mentioned in this paper.

  3. Helicopter magnetic survey conducted to locate wells

    SciTech Connect (OSTI)

    Veloski, G.A.; Hammack, R.W.; Stamp, V.; Hall, R.; Colina, K.

    2008-07-01

    A helicopter magnetic survey was conducted in August 2007 over 15.6 sq mi at the Naval Petroleum Reserve No. 3’s (NPR-3) Teapot Dome Field near Casper, Wyoming. The survey’s purpose was to accurately locate wells drilled there during more than 90 years of continuous oilfield operation. The survey was conducted at low altitude and with closely spaced flight lines to improve the detection of wells with weak magnetic response and to increase the resolution of closely spaced wells. The survey was in preparation for a planned CO2 flood for EOR, which requires a complete well inventory with accurate locations for all existing wells. The magnetic survey was intended to locate wells missing from the well database and to provide accurate locations for all wells. The ability of the helicopter magnetic survey to accurately locate wells was accomplished by comparing airborne well picks with well locations from an intense ground search of a small test area.

  4. U.S. Geothermal Announces More Test Results From the Neal Hot Springs Production Well and a Key Addition to Senior Staff

    Broader source: Energy.gov [DOE]

    U.S. Geothermal Inc. ("U.S. Geothermal"), a renewable energy company focused on the production of electricity from geothermal energy, announced today results from a second, higher rate flow test of the first full size production well (NHS-1) at the Neal Hot Springs Project.

  5. Subsea production systems - trends in the nineties: Minitemplate/cluster wells; towed flowline bundles; multiphase flowmeters, improved gauges - a proven track record

    SciTech Connect (OSTI)

    Jones, J.W.

    1996-04-01

    Subsea production systems have successfully demonstrated their overall reliability, and have established a proven track record over the past 30 years of field experience. Current trends in their configuration from large, heavy, multiwell integrated drilling template and production/injection manifold systems to small, light-weight, {open_quotes}mini template{close_quotes} systems or clustered well manifolds with individual satellite wells-essentially a cost reduction trend-are expected to continue throughout the remainder of the decade. System configuration and equipment technology trends in the 1990s are now improving the profitability and capability of subsea production systems.

  6. Entiat 4Mile WELLs Completion Report, 2006.

    SciTech Connect (OSTI)

    Malinowksi, Richard

    2007-01-01

    The Entiat 4-mile Wells (Entiat 4-mile) project is located in the Entiat subbasin and will benefit Upper Columbia steelhead, spring Chinook and bull trout. The goal of this project is to prevent juvenile fish from being diverted into an out-of-stream irrigation system and to eliminate impacts due to the annual maintenance of an instream pushup dam. The objectives include eliminating a surface irrigation diversion and replacing it with two wells, which will provide Bonneville Power Administration (BPA) and the Bureau of Reclamation (Reclamation) with a Federal Columbia River Power System (FCRPS) BiOp metric credit of one. Wells were chosen over a new fish screen based on biological benefits and costs. Long-term biological benefits are provided by completely eliminating the surface diversion and the potential for fish entrainment in a fish screen. Construction costs for a new fish screen were estimated at $150,000, which does not include other costs associated with implementing and maintaining a fish screening project. Construction costs for a well were estimated at $20,000 each. The diversion consisted of a pushup dam that diverted water into an off-channel pond. Water was then pumped into a pressurized system for irrigation. There are 3 different irrigators who used water from this surface diversion, and each has multiple water right claims totaling approximately 5 cfs. Current use was estimated at 300 gallons per minute (approximately 0.641 cfs). Some irrigated acreage was taken out of orchard production less than 5 years ago. Therefore, approximately 6.8 acre-feet will be put into the State of Washington Trust Water Right program. No water will be set aside for conservation savings. The construction of the two irrigation wells for three landowners was completed in September 2006. The Lower Well (Tippen/Wick) will produce up to 175 gpm while the Upper Well (Griffith) will produce up to 275 gpm during the irrigation season. The eight inch diameter wells were

  7. Track 4: Employee Health and Wellness

    Office of Energy Efficiency and Renewable Energy (EERE)

    ISM Workshop Presentations Knoxville Convention Center, Knoxville, TN August 2009 Track 4: Employee Health and Wellness

  8. Estimating the upper limit of gas production from Class 2 hydrate accumulations in the permafrost: 2. Alternative well designs and sensitivity analysis

    SciTech Connect (OSTI)

    Moridis, G.; Reagan, M.T.

    2011-01-15

    In the second paper of this series, we evaluate two additional well designs for production from permafrost-associated (PA) hydrate deposits. Both designs are within the capabilities of conventional technology. We determine that large volumes of gas can be produced at high rates (several MMSCFD) for long times using either well design. The production approach involves initial fluid withdrawal from the water zone underneath the hydrate-bearing layer (HBL). The production process follows a cyclical pattern, with each cycle composed of two stages: a long stage (months to years) of increasing gas production and decreasing water production, and a short stage (days to weeks) that involves destruction of the secondary hydrate (mainly through warm water injection) that evolves during the first stage, and is followed by a reduction in the fluid withdrawal rate. A well configuration with completion throughout the HBL leads to high production rates, but also the creation of a secondary hydrate barrier around the well that needs to be destroyed regularly by water injection. However, a configuration that initially involves heating of the outer surface of the wellbore and later continuous injection of warm water at low rates (Case C) appears to deliver optimum performance over the period it takes for the exhaustion of the hydrate deposit. Using Case C as the standard, we determine that gas production from PA hydrate deposits increases with the fluid withdrawal rate, the initial hydrate saturation and temperature, and with the formation permeability.

  9. Hydrogen Pathways: Cost, Well-to-Wheels Energy Use, and Emissions for the Current Technology Status of Seven Hydrogen Production, Delivery, and Distribution Scenarios

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen Pathways: Cost, Well-to-Wheels Energy Use, and Emissions for the Current Technology Status of Seven Hydrogen Production, Delivery, and Distribution Scenarios Mark Ruth National Renewable Energy Laboratory Melissa Laffen and Thomas A. Timbario Alliance Technical Services, Inc. Technical Report NREL/TP-6A1-46612 September 2009 Technical Report Hydrogen Pathways: Cost, NREL/TP-6A1-46612 Well-to-Wheels Energy Use, September 2009 and Emissions for the Current Technology Status of Seven

  10. Maximize revenue from gas condensate wells

    SciTech Connect (OSTI)

    Hall, S.R.

    1988-07-01

    A computerized oil/gas modeling program called C.O.M.P. allows operators to select the economically optimum producing equipment for a given gas-condensate well-stream. This article, the first of two, discusses use of the model to analyze performance of six different production system on the same wellstream and at the same wellhead conditions. All producing equipment options are unattended wellhead facilities designed for high volume gas-condensate wells and are not gas plants. A second article to appear in September will discuss operating experience with one of the producing systems analyzed, integrated multi-stage separation with stabilization and compression (the HERO system), which was developed by U.S. Enertek, Inc. This equipment was chosen for the wellstream analyzed because of the potential revenue increase indicated by the model.

  11. GAS INJECTION/WELL STIMULATION PROJECT

    SciTech Connect (OSTI)

    John K. Godwin

    2005-12-01

    Driver Production proposes to conduct a gas repressurization/well stimulation project on a six well, 80-acre portion of the Dutcher Sand of the East Edna Field, Okmulgee County, Oklahoma. The site has been location of previous successful flue gas injection demonstration but due to changing economic and sales conditions, finds new opportunities to use associated natural gas that is currently being vented to the atmosphere to repressurize the reservoir to produce additional oil. The established infrastructure and known geological conditions should allow quick startup and much lower operating costs than flue gas. Lessons learned from the previous project, the lessons learned form cyclical oil prices and from other operators in the area will be applied. Technology transfer of the lessons learned from both projects could be applied by other small independent operators.

  12. Completion practices in deep sour Tuscaloosa wells

    SciTech Connect (OSTI)

    Huntoon, G.G.

    1984-01-01

    Successful development of the Tuscaloosa trend in Louisiana has required unique completion practices to produce the trend's deep sour formations. Amoco's operations in the Tuscaloosa formation are between 16,000 and 21,000 ft (4877 and 6400 m), and a range of pressure environments, high temperatures, and corrosive elements is encountered. Application of proved completion practices and equipment has resulted in several techniques that enhance the safety, longevity, and production capacity of these wells. The design of deep Tuscaloosa completions is assisted by a series of correlations developed to project bottomhole and surface shut-in tubing pressures, temperature gradients, and flow capacities for deep sour wells. This paper discusses material selection, completion practices, completion fluids, wellhead equipment, packer designs, corrosion-inhibition systems, and safety and monitoring equipment used in the Tuscaloosa trend. The design of a wellhead surface installation used to detect equipment failure, to pump kill fluids, and to circulate corrosion inhibitors is reviewed. A case study illustrates the methods used in completing a Tuscaloosa well with surface pressures exceeding 16,000 psi (110.3 MPa). Deep high-pressure sour-gas wells can be completed safely if all the elements of the environment that will affect the mechanical integrity of the wellbore are considered in the completion designs. The development of higher-strength material capable of withstanding SSC is needed if wells are completed in formations deeper than 22,000 ft (6700 m). Further research is necessary on the use of alloy steels and nonferrous metals for sour service. Effective high-temperature corrosion inhibitors for heavy zinc bromide completion fluids must be developed before these brines can be used in the Tuscaloosa. The testing of new inhibitors for use in highpressure sour-gas completions should be continued.

  13. Vapor port and groundwater sampling well

    DOE Patents [OSTI]

    Hubbell, Joel M.; Wylie, Allan H.

    1996-01-01

    A method and apparatus has been developed for combining groundwater monitoring wells with unsaturated-zone vapor sampling ports. The apparatus allows concurrent monitoring of both the unsaturated and the saturated zone from the same well at contaminated areas. The innovative well design allows for concurrent sampling of groundwater and volatile organic compounds (VOCs) in the vadose (unsaturated) zone from a single well, saving considerable time and money. The sample tubes are banded to the outer well casing during installation of the well casing.

  14. Vapor port and groundwater sampling well

    DOE Patents [OSTI]

    Hubbell, J.M.; Wylie, A.H.

    1996-01-09

    A method and apparatus have been developed for combining groundwater monitoring wells with unsaturated-zone vapor sampling ports. The apparatus allows concurrent monitoring of both the unsaturated and the saturated zone from the same well at contaminated areas. The innovative well design allows for concurrent sampling of groundwater and volatile organic compounds (VOCs) in the vadose (unsaturated) zone from a single well, saving considerable time and money. The sample tubes are banded to the outer well casing during installation of the well casing. 10 figs.

  15. Consortium for Petroleum & Natural Gas Stripper Wells

    SciTech Connect (OSTI)

    Morrison, Joel

    2011-12-01

    The United States has more oil and gas wells than any other country. As of December 31, 2004, there were more than half a million producing oil wells in the United States. That is more than three times the combined total for the next three leaders: China, Canada, and Russia. The Stripper Well Consortium (SWC) is a partnership that includes domestic oil and gas producers, service and supply companies, trade associations, academia, the Department of Energy’s Strategic Center for Natural Gas and Oil (SCNGO) at the National Energy Technology Laboratory (NETL), and the New York State Energy Research and Development Authority (NYSERDA). The Consortium was established in 2000. This report serves as a final technical report for the SWC activities conducted over the May 1, 2004 to December 1, 2011 timeframe. During this timeframe, the SWC worked with 173 members in 29 states and three international countries, to focus on the development of new technologies to benefit the U.S. stripper well industry. SWC worked with NETL to develop a nationwide request-for-proposal (RFP) process to solicit proposals from the U.S. stripper well industry to develop and/or deploy new technologies that would assist small producers in improving the production performance of their stripper well operations. SWC conducted eight rounds of funding. A total of 132 proposals were received. The proposals were compiled and distributed to an industry-driven SWC executive council and program sponsors for review. Applicants were required to make a formal technical presentation to the SWC membership, executive council, and program sponsors. After reviewing the proposals and listening to the presentations, the executive council made their funding recommendations to program sponsors. A total of 64 projects were selected for funding, of which 59 were fully completed. Penn State then worked with grant awardees to issue a subcontract for their approved work. SWC organized and hosted a total of 14 meetings

  16. Logging of subterranean wells using coiled tubing

    SciTech Connect (OSTI)

    Pilla, J.

    1991-01-15

    This patent describes an apparatus for production logging of a well utilizing artificial lift in a wellbore. It comprises: coiled tubing extending into the wellbore having wireline electrical cable passing through a central bore thereof and having a remote end within the wellbore which end is connected to gas injector means. The wireline cable passing through the gas injector means to a flexible electrically conductive support spacer having an end portion remote from the gas injector means and logging means connected to the end portion of the support spacer.

  17. Deep Production Well for Geothermal Direct-Use Heating of A Large Commercial Greenhouse, Radium Springs, Rio Grande Rift, New Mexico

    SciTech Connect (OSTI)

    James C. Witcher

    2002-01-02

    Expansion of a large commercial geothermally-heated greenhouse is underway and requires additional geothermal fluid production. This report discusses the results of a cost-shared U.S. Department of Energy (DOE) and A.R. Masson, Inc. drilling project designed to construct a highly productive geothermal production well for expansion of the large commercial greenhouse at Radium Springs. The well should eliminate the potential for future thermal breakthrough from existing injection wells and the inducement of inflow from shallow cold water aquifers by geothermal production drawdown in the shallow reservoir. An 800 feet deep production well, Masson 36, was drilled on a US Bureau of Land Management (BLM) Geothermal Lease NM-3479 at Radium Springs adjacent to the A. R. Masson Radium Springs Farm commercial greenhouse 15 miles north of Las Cruces in Dona Ana County, New Mexico just west of Interstate 25 near the east bank of the Rio Grande. The area is in the Rio Grande rift, a tectonically-active region with high heat flow, and is one of the major geothermal provinces in the western United State.

  18. Step-out Well | Open Energy Information

    Open Energy Info (EERE)

    step-out well should be drilled where there is some evidence of a permeable formation linked with the main reservoir. The well should be drilled in a location to where if it is an...

  19. RFI Well Integrity 06 JUL 1400

    Broader source: Energy.gov [DOE]

    This PowerPoint report entitled "Well Integrity During Shut - In Operations: DOE/DOI Analyses" describes risks and suggests risk management recommendations associated with shutting in the well.

  20. Salt Wells Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Salt Wells Geothermal Project Project Location Information Coordinates 39.580833333333,...

  1. STIMULATION TECHNOLOGIES FOR DEEP WELL COMPLETIONS

    SciTech Connect (OSTI)

    Stephen Wolhart

    2003-06-01

    The Department of Energy (DOE) is sponsoring a Deep Trek Program targeted at improving the economics of drilling and completing deep gas wells. Under the DOE program, Pinnacle Technologies is conducting a project to evaluate the stimulation of deep wells. The objective of the project is to assess U.S. deep well drilling & stimulation activity, review rock mechanics & fracture growth in deep, high pressure/temperature wells and evaluate stimulation technology in several key deep plays. Phase 1 was recently completed and consisted of assessing deep gas well drilling activity (1995-2007) and an industry survey on deep gas well stimulation practices by region. Of the 29,000 oil, gas and dry holes drilled in 2002, about 300 were drilled in the deep well; 25% were dry, 50% were high temperature/high pressure completions and 25% were simply deep completions. South Texas has about 30% of these wells, Oklahoma 20%, Gulf of Mexico Shelf 15% and the Gulf Coast about 15%. The Rockies represent only 2% of deep drilling. Of the 60 operators who drill deep and HTHP wells, the top 20 drill almost 80% of the wells. Six operators drill half the U.S. deep wells. Deep drilling peaked at 425 wells in 1998 and fell to 250 in 1999. Drilling is expected to rise through 2004 after which drilling should cycle down as overall drilling declines.

  2. USING 3D COMPUTER MODELING, BOREHOLE GEOPHYSICS, AND HIGH CAPACITY PUMPS TO RESTORE PRODUCTION TO MARGINAL WELLS IN THE EAST TEXAS FIELD

    SciTech Connect (OSTI)

    R.L. Bassett

    2003-06-09

    Methods for extending the productive life of marginal wells in the East Texas Field were investigated using advanced computer imaging technology, geophysical tools, and selective perforation of existing wells. Funding was provided by the Department of Energy, TENECO Energy and Schlumberger Wireline and Testing. Drillers' logs for more than 100 wells in proximity to the project lease were acquired, converted to digital format using a numerical scheme, and the data were used to create a 3 Dimensional geological image of the project site. Using the descriptive drillers' logs in numerical format yielded useful cross sections identifying the Woodbine Austin Chalk contact and continuity of sand zones between wells. The geological data provided information about reservoir continuity, but not the amount of remaining oil, this was obtained using selective modern logs. Schlumberger logged the wells through 2 3/8 inch tubing with a new slimhole Reservoir Saturation Tool (RST) which can measure the oil and water content of the existing porosity, using neutron scattering and a gamma ray spectrometer (GST). The tool provided direct measurements of elemental content yielding interpretations of porosity, lithology, and oil and water content, confirming that significant oil saturation still exists, up to 50% in the upper Woodbine sand. Well testing was then begun and at the end of the project new oil was being produced from zones abandoned or bypassed more than 25 years ago.

  3. Hydrogen Pathways: Updated Cost, Well-to-Wheels Energy Use, and Emissions for the Current Technology Status of Ten Hydrogen Production, Delivery, and Distribution Scenarios

    SciTech Connect (OSTI)

    Ramsden, T.; Ruth, M.; Diakov, V.; Laffen, M.; Timbario, T. A.

    2013-03-01

    This report describes a life-cycle assessment conducted by the National Renewable Energy Laboratory (NREL) of 10 hydrogen production, delivery, dispensing, and use pathways that were evaluated for cost, energy use, and greenhouse gas (GHG) emissions. This evaluation updates and expands on a previous assessment of seven pathways conducted in 2009. This study summarizes key results, parameters, and sensitivities to those parameters for the 10 hydrogen pathways, reporting on the levelized cost of hydrogen in 2007 U.S. dollars as well as life-cycle well-to-wheels energy use and GHG emissions associated with the pathways.

  4. Well purge and sample apparatus and method

    DOE Patents [OSTI]

    Schalla, R.; Smith, R.M.; Hall, S.H.; Smart, J.E.; Gustafson, G.S.

    1995-10-24

    The present invention specifically permits purging and/or sampling of a well but only removing, at most, about 25% of the fluid volume compared to conventional methods and, at a minimum, removing none of the fluid volume from the well. The invention is an isolation assembly with a packer, pump and exhaust, that is inserted into the well. The isolation assembly is designed so that only a volume of fluid between the outside diameter of the isolation assembly and the inside diameter of the well over a fluid column height from the bottom of the well to the top of the active portion (lower annulus) is removed. The packer is positioned above the active portion thereby sealing the well and preventing any mixing or contamination of inlet fluid with fluid above the packer. Ports in the wall of the isolation assembly permit purging and sampling of the lower annulus along the height of the active portion. 8 figs.

  5. Well purge and sample apparatus and method

    DOE Patents [OSTI]

    Schalla, Ronald; Smith, Ronald M.; Hall, Stephen H.; Smart, John E.; Gustafson, Gregg S.

    1995-01-01

    The present invention specifically permits purging and/or sampling of a well but only removing, at most, about 25% of the fluid volume compared to conventional methods and, at a minimum, removing none of the fluid volume from the well. The invention is an isolation assembly with a packer, pump and exhaust, that is inserted into the well. The isolation assembly is designed so that only a volume of fluid between the outside diameter of the isolation assembly and the inside diameter of the well over a fluid column height from the bottom of the well to the top of the active portion (lower annulus) is removed. The packer is positioned above the active portion thereby sealing the well and preventing any mixing or contamination of inlet fluid with fluid above the packer. Ports in the wall of the isolation assembly permit purging and sampling of the lower annulus along the height of the active portion.

  6. Cathodic protection of storage field well casings

    SciTech Connect (OSTI)

    Dabkowski, J.

    1986-01-01

    Downhole logging of gas storage field wells to determine cathodic protection (CP) levels is expensive and requires removing the well from service. A technique allowing the prediction of downhole CP levels by modeling combined with limiting field measurements would provide the industry with a cost-effective means of implementing and monitoring casing protection. A computer model has been developed for a cathodically protected well casing.

  7. Well Log Techniques | Open Energy Information

    Open Energy Info (EERE)

    formation properties versus depth in a borehole. Other definitions:Wikipedia Reegle Introduction Well logging, also known as wireline logging, is a method of data collection in the...

  8. Stimulation Technologies for Deep Well Completions

    SciTech Connect (OSTI)

    Stephen Wolhart

    2005-06-30

    The Department of Energy (DOE) is sponsoring the Deep Trek Program targeted at improving the economics of drilling and completing deep gas wells. Under the DOE program, Pinnacle Technologies conducted a study to evaluate the stimulation of deep wells. The objective of the project was to review U.S. deep well drilling and stimulation activity, review rock mechanics and fracture growth in deep, high-pressure/temperature wells and evaluate stimulation technology in several key deep plays. This report documents results from this project.

  9. Excepted Service Authority for Exceptionally Well Qualified ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Service Authority for Exceptionally Well Qualified (EWQ) EQ Pay Plan Employees by Erin Moore Functional areas: Excepted Service, EWQ Pay Plan Employees The order establishes...

  10. Wells, Vermont: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Wells, Vermont: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 43.4172937, -73.2042744 Show Map Loading map... "minzoom":false,"mappingservice...

  11. Characterization Well R-22 Geochemistry Report

    SciTech Connect (OSTI)

    Patrick Longmire

    2002-09-01

    This report provides analytical results for groundwater collected during four characterization-sampling rounds conducted at well R-22 from March 2001 through March 2002. Characterization well R-22 was sampled from March 6 through 13, 2001; June 19 through 26, 2001; November 30 through December 10, 2001; and February 27 through March 7, 2002. The goal of the characterization efforts was to assess the hydrochemistry and to determine whether or not contaminants are present in the regional aquifer in the vicinity of the well. A geochemical evaluation of the analytical results for the well is also presented in this report.

  12. Hawaii Well Construction & Pump Installation Standards | Open...

    Open Energy Info (EERE)

    Handbook Abstract This document provides an overview of the well construction and pump installation standards in Hawaii. Author State of Hawaii Commission on Water Resource...

  13. Hawaii Well Construction & Pump Installation Standards Webpage...

    Open Energy Info (EERE)

    Standards Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii Well Construction & Pump Installation Standards Webpage Abstract This webpage...

  14. Quantum Well Thermoelectric Truck Air Conditioning

    Office of Energy Efficiency and Renewable Energy (EERE)

    Discusses advantages of quantum-well TE cooler, including no moving parts, no gases, performance on par with conventional, and easy switching to heat pump mode

  15. Observation Wells (Ozkocak, 1985) | Open Energy Information

    Open Energy Info (EERE)

    test wells can be used to obtain quite precise measurements of reservoir permeability. References o ozkocak (1985) Un Seminar On The Utilization Of Geothermal Energy For...

  16. Adaptive control system for gas producing wells

    SciTech Connect (OSTI)

    Fedor, Pashchenko; Sergey, Gulyaev; Alexander, Pashchenko

    2015-03-10

    Optimal adaptive automatic control system for gas producing wells cluster is proposed intended for solving the problem of stabilization of the output gas pressure in the cluster at conditions of changing gas flow rate and changing parameters of the wells themselves, providing the maximum high resource of hardware elements of automation.

  17. Geothermal Reservoir Well Stimulation Program: technology transfer

    SciTech Connect (OSTI)

    Not Available

    1980-05-01

    Each of the following types of well stimulation techniques are summarized and explained: hydraulic fracturing; thermal; mechanical, jetting, and drainhole drilling; explosive and implosive; and injection methods. Current stimulation techniques, stimulation techniques for geothermal wells, areas of needed investigation, and engineering calculations for various techniques. (MHR)

  18. Reservoir visualization for geosteering of horizontal wells

    SciTech Connect (OSTI)

    Bryant, I.D.; Baygun, B.; Frass, M.; Casco, R.

    1996-08-01

    Horizontal infill wells in the Lower Lagunillas reservoir of Bloque IV, Lake Maracaibo are being drilled in thin, oil-bearing zones that have been bypassed by gas. Steering the horizontal sections of these wells requires high resolution reservoir models that can be updated during drilling. An example from well VLD-1152 serves to illustrate how these models are generated and used. Resistivity images collected by wireline and logging-while-drilling (LWD) tools in the pilot well formed the basis of prejob, high resolution modeling of the formation properties. 3-D seismic data and data from an offset vertical seismic profile collected in the pilot well provided the structural model. During drilling information from cuttings and LWD tools was used to continuously update these models. After the well had been drilled, analysis of LWD resistivity images provided a detailed model of the relationship between the well trajectory and the dip of the formation. This information is used to improve interpretation of the LWD logs to provide a petrophysical evaluation of the well.

  19. Geopressured-geothermal well activities in Louisiana

    SciTech Connect (OSTI)

    John, C.J.

    1992-10-01

    Since September 1978, microseismic networks have operated continuously around US Department of Energy (DOE) geopressured-geothermal well sites to monitor any microearthquake activity in the well vicinity. Microseismic monitoring is necessary before flow testing at a well site to establish the level of local background seismicity. Once flow testing has begun, well development may affect ground elevations and/or may activate growth faults, which are characteristic of the coastal region of southern Louisiana and southeastern Texas where these geopressured-geothermal wells are located. The microseismic networks are designed to detest small-scale local earthquakes indicative of such fault activation. Even after flow testing has ceased, monitoring continues to assess any microearthquake activity delayed by the time dependence of stress migration within the earth. Current monitoring shows no microseismicity in the geopressured-geothermal prospect areas before, during, or after flow testing.

  20. Monitoring cathodic protection of well casings

    SciTech Connect (OSTI)

    Dabkowski, J.

    1980-01-01

    Because conventional downhole logging of gas storage wells to determine cathodic-protection levels is expensive and inconvenient, a program was developed (1) to predict downhole casing-to-soil potentials from wellhead measurements in the presence of interference and (2 )to model the mutual interference effects occurring between the wells and the cathodic-protection systems. In the first phase of this project, a transmission-line model that was developed to represent the well casing electrically adequately predicted the downhole potentials for both ideal and nonideal polarization conditions. By allowing the number of sections used and their parameter values as variables, the model can accommodate different environments and casing configurations. The model's representation of a well casing by a lumped-parameter electrical network will also permit interference studies between mutually coupled wells.

  1. Category:Single-Well And Cross-Well Seismic Imaging | Open Energy...

    Open Energy Info (EERE)

    Login | Sign Up Search Category Edit History Category:Single-Well And Cross-Well Seismic Imaging Jump to: navigation, search Geothermalpower.jpg Looking for the Single-Well...

  2. RAPID/Geothermal/Well Field/Utah | Open Energy Information

    Open Energy Info (EERE)

    an operating unit and have like characteristics. Local Well Field Process not available Policies & Regulations UAC Rule R655-1 Wells Used for the Discovery and Production of...

  3. Investigation and evaluation of geopressured-geothermal wells. Final report, Tenneco Fee N No. 1 Well Terrebonne Paris, Louisiana

    SciTech Connect (OSTI)

    Dobson, R.J.; Hartsock, J.H.; McCoy, R.L.; Rodgers, J.A.

    1980-09-01

    The reservoir conditions that led to the choice of this well as the fifth well of opportunity are described as well as the attempts to complete the well for high-volume brine production. Individual opinions concerning underlying and conributing causes for the liner failure which aborted the completion attempt are included. (MHR)

  4. California Water Well Standards | Open Energy Information

    Open Energy Info (EERE)

    Water Well StandardsLegal Published NA Year Signed or Took Effect 2104 Legal Citation Not provided DOI Not Provided Check for DOI availability: http:crossref.org Online...

  5. Groundwater well with reactive filter pack

    DOE Patents [OSTI]

    Gilmore, Tyler J.; Holdren, Jr., George R.; Kaplan, Daniel I.

    1998-01-01

    A method and apparatus for the remediation of contaminated soil and ground water wherein a reactive pack material is added to the annular fill material utilized in standard well construction techniques.

  6. Groundwater well with reactive filter pack

    DOE Patents [OSTI]

    Gilmore, T.J.; Holdren, G.R. Jr.; Kaplan, D.I.

    1998-09-08

    A method and apparatus are disclosed for the remediation of contaminated soil and ground water wherein a reactive pack material is added to the annular fill material utilized in standard well construction techniques. 3 figs.

  7. Well Record or History | Open Energy Information

    Open Energy Info (EERE)

    Record or History Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Well Record or HistoryLegal Published NA Year Signed or Took...

  8. Ultrabroad stimulated emission from quantum well laser

    SciTech Connect (OSTI)

    Wang, Huolei; Zhou, Xuliang; Yu, Hongyan; Mi, Junping; Wang, Jiaqi; Bian, Jing; Wang, Wei; Pan, Jiaoqing; Ding, Ying; Chen, Weixi

    2014-06-23

    Observation of ultrabroad stimulated emission from a simplex quantum well based laser at the center wavelength of 1.06??m is reported. With increased injection current, spectrum as broad as 38?nm and a pulsed output power of ?50?mW have been measured. The experiments show evidence of an unexplored broad emission regime in the InGaAs/GaAs quantum well material system, which still needs theoretical modeling and further analysis.

  9. Geohydrologic study of the Michigan Basin for the applicability of Jack W. McIntyre`s patented process for simultaneous gas recovery and water disposal in production wells

    SciTech Connect (OSTI)

    Maryn, S.

    1994-03-01

    Geraghty & Miller, Inc. of Midland, Texas conducted a geohydrologic study of the Michigan Basin to evaluate the applicability of Jack McIntyre`s patented process for gas recovery and water disposal in production wells. A review of available publications was conducted to identify, (1) natural gas reservoirs which generate large quantities of gas and water, and (2) underground injection zones for produced water. Research efforts were focused on unconventional natural gas formations. The Antrim Shale is a Devonian gas shale which produces gas and large quantities of water. Total 1992 production from 2,626 wells was 74,209,916 Mcf of gas and 25,795,334 bbl of water. The Middle Devonian Dundee Limestone is a major injection zone for produced water. ``Waterless completion`` wells have been completed in the Antrim Shale for gas recovery and in the Dundee Limestone for water disposal. Jack McIntyre`s patented process has potential application for the recovery of gas from the Antrim Shale and simultaneous injection of produced water into the Dundee Limestone.

  10. Wells Public Utilities- Commercial & Industrial Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    SMMPA develops innovative products and services to help them deliver value to customers. With help from SMMPA, Wells Public Utilities provides incentives for its commercial and industrial custome...

  11. Wells Fargo National Cleantech Group | Open Energy Information

    Open Energy Info (EERE)

    Fargo National Cleantech Group Jump to: navigation, search Name: Wells Fargo National Cleantech Group Place: Palo Alto, California Product: California based commercial banking unit...

  12. Property:FirstWellFlowComments | Open Energy Information

    Open Energy Info (EERE)

    Showing 3 pages using this property. C Chena Geothermal Area + Flow test enabled estimation of drawdown of 148 ft in the production well at the required...

  13. Wells Public Utilities- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    SMMPA develops innovative products and services to help them deliver value to customers. With help from SMMPA, Wells Public Utilities provides incentives for residential and commercial customers ...

  14. Maximize revenue from gas condensate wells

    SciTech Connect (OSTI)

    Hall, S.R. )

    1988-09-01

    A computerized oil/gas modeling program called C.O.M.P. was used to analyze comparative recovery, losses and revenues from six different producing systems on a given wellstream as tested on initial completion. A multi-stage separation/stabilization/compression system (HERO system) manufactured by U.S. Enertek, Inc., was subsequently installed to produce the well, plus five other wells in the immediate area. This article compares theoretical gains forecast by the modeling program with actual gains recorded during later testing of the same well with a two-stage separation hookup and the multi-stage unit. The test using two-stage separation was run as a basis for comparison. Operating temperatures and pressures for each test are shown.

  15. Waterflooding in a system of horizontal wells

    SciTech Connect (OSTI)

    Bedrikovetsky, P.G.; Magarshak, T.O.; Shapiro, A.A.

    1995-10-01

    An approximate analytical method for the simulation of waterflooding in a system of horizontal wells is developed. The method is based on an advanced stream-line concept. The essence of this new method is the exact solution for the 3D two-phase flow problem in the system of coordinates linked with the stream lines under the only assumption of the immobility of stream lines. A software based on this approach was developed for IBM-compatible PC. It allows one multivariant comparative studies of immiscible displacement in systems of horizontal, vertical and slant wells. The simulator has been used in order to optimize geometrical parameters of a regular well system and to predict recovery in conditions of Prirazlomnoye offshore oil field.

  16. Resonator-quantum well infrared photodetectors

    SciTech Connect (OSTI)

    Choi, K. K. Sun, J.; Olver, K.; Jhabvala, M. D.; Jhabvala, C. A.; Waczynski, A.

    2013-11-11

    We applied a recent electromagnetic model to design the resonator-quantum well infrared photodetector (R-QWIP). In this design, we used an array of rings as diffractive elements to diffract normal incident light into parallel propagation and used the pixel volume as a resonator to intensify the diffracted light. With a proper pixel size, the detector resonates at certain optical wavelengths and thus yields a high quantum efficiency (QE). To test this detector concept, we fabricated a number of R-QWIPs with different quantum well materials and detector geometries. The experimental result agrees satisfactorily with the prediction, and the highest QE achieved is 71%.

  17. Subsea well with retrievable piping deck

    SciTech Connect (OSTI)

    Pokladnik, R.L.; Valka, W.A.

    1984-03-27

    An apparatus and method for drilling and completing a subsea well located at the seabed using a retrievable piping deck. The apparatus includes a template supported on the seabed, the retrievable piping deck supported on the template, a plurality of wellheads supported on the template and a plurality of Christmas trees supported on the wellheads. The piping deck has preinstalled flow lines and hydraulic lines to conduct well fluid from the Christmas trees to the surface and to conduct hydraulic control fluid from the surface to the trees. In addition to the Christmas trees, a well fluid manifold and a gaseous-liquid component separator can be supported on the template. The fluid connections between the Christmas trees and the hydraulic and flow lines and between the manifold and separator and the hydraulic and flow lines are accomplished by vertically oriented stab-in connectors. After installation of the template and drilling of the wells, the piping deck is lowered independently to the template and coupled thereto and then the Christmas trees and manifold-separator are lowered to the template and into fluid communication with the piping deck hydraulic and flow lines.

  18. Marginal Expense Oil Well Wireless Surveillance (MEOWWS)

    SciTech Connect (OSTI)

    Nelson, Donald G.

    2002-03-11

    The objective of this study was to identify and field test a new, low cost, wireless oil well surveillance system. A variety of suppliers and technologies were considered. One supplier and system was chosen that was low cost, new to the oil field, and successfully field tested.

  19. Liquid Observation Well (LOW) Functional Design

    SciTech Connect (OSTI)

    Paul, B.

    1995-01-04

    This document presents the Functional Design Criteria for installing Liquid Observation Wells (LOWS) into single-shell tanks containing either ferrocyanide or organic waste. The LOWs will be designed to accommodate the deployment of gamma, neutron, and electromagnetic induction probes and to interface with the existing tank structure and environment.

  20. Indian Wells Valley FORGE Aeromagnetic Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Doug Blankenship

    1994-11-01

    Aeromagnetic data was collected over the Indian Wells Valley, CA in November 1994. It consisted of 9,033 line-kilometers covering ~4,150 square kilometers, flown at a 250 meter drape with principal line spacing of 0.54 kilometers and 10% cross-lines. The principal orientation is N65E.

  1. T2WELL/ECO2N

    Energy Science and Technology Software Center (OSTI)

    002966IBMPC00 T2Well/ECO2N Version 1.0: Multiphase and Non-Isothermal Model for Coupled Wellbore-Reservoir Flow of Carbon Dioxide and Variable Salinity Water  http:..esd.lbl.gov/tough/licensing.html 

  2. Boise geothermal injection well: Final environmental assessment

    SciTech Connect (OSTI)

    1997-12-31

    The City of Boise, Idaho, an Idaho Municipal Corporation, is proposing to construct a well with which to inject spent geothermal water from its hot water heating system back into the geothermal aquifer. Because of a cooperative agreement between the City and the US Department of Energy to design and construct the proposed well, compliance to the National Environmental Policy Act (NEPA) is required. Therefore, this Environmental Assessment (EA) represents the analysis of the proposed project required under NEPA. The intent of this EA is to: (1) briefly describe historical uses of the Boise Geothermal Aquifer; (2) discuss the underlying reason for the proposed action; (3) describe alternatives considered, including the No Action Alternative and the Preferred Alternative; and (4) present potential environmental impacts of the proposed action and the analysis of those impacts as they apply to the respective alternatives.

  3. Perforating devices for use in wells

    DOE Patents [OSTI]

    Jacoby, Jerome J.; Brooks, James E.; Aseltine, Clifford L.

    2002-01-01

    The perforating device for use in completing a well includes a case, an explosive charge contained in the case, and a generally bowl-shaped liner. The liner is positioned adjacent the explosive charge and has non-uniforrn thickness along its length. The liner further includes a protruding portion near its tip. In another configuration, the liner includes a hole near its tip to expose a portion of the explosive charge.

  4. Energy loss rate in disordered quantum well

    SciTech Connect (OSTI)

    Tripathi, P.; Ashraf, S. S. Z.; Hasan, S. T.; Sharma, A. C.

    2014-04-24

    We report the effect of dynamically screened deformation potential on the electron energy loss rate in disordered semiconductor quantum well. Interaction of confined electrons with bulk acoustic phonons has been considered in the deformation coupling. The study concludes that the dynamically screened deformation potential coupling plays a significant role as it substantially affects the power dependency of electron relaxation on temperature and mean free path.

  5. Recompletion Report for Well UE-10j

    SciTech Connect (OSTI)

    M. J. Townsend

    2000-05-01

    Existing Well UE-10j was deepened and recompleted for the U.S. Department of Energy, Nevada Operations Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. The well was originally drilled to a total depth of 725.4 meters in 1965 for use as a hydrologic test hole in the northern portion of Yucca Flat in Area 8 of the Nevada Test Site. The well is located up-gradient of the Yucca Flat underground test area and penetrates deep into the Paleozoic rocks that form the lower carbonate aquifer of the NTS and surrounding areas. The original 24.4-centimeter-diameter borehole was drilled to a depth of 725.4 meters and left uncompleted. Water-level measurements were made periodically by the U.S. Geological Survey, but access to the water table was lost between 1979 and 1981 due to hole sloughing. In 1993, the hole was opened to 44.5 centimeters and cased off to a depth of 670.0 meters. The hole diameter was then decreased to 31.1 centimeters for drilling to a total depth of 796.4 meters. The depth to water in the open borehole was measured at 658.7 meters on March 18, 1993.

  6. Drawdown behavior of gravity drainage wells

    SciTech Connect (OSTI)

    Aasen, J.A.; Ramey, H.J. Jr.

    1993-10-01

    An analytical solution for drawdown in gravity drainage wells is developed. The free-surface flow is viewed as incompressible, and anisotropy effects are included. The well is a line source well, and the reservoir is infinitely large. The model is valid for small drawdowns. The uniform wellbore potential inner boundary condition is modelled using the proper Green`s function. The discontinuity at the wellbore is solved by introducing a finite skin radius, and the formulation produces a seepage face. The calculated wellbore flux distribution and wellbore pressures are in fair agreement with results obtained using a numerical gravity drainage simulator. Three distinct flow periods are observed. The wellbore storage period is caused by the moving liquid level, and the duration is short. During the long intermediate flow period, the wellbore pressure is nearly constant. In this period the free surface moves downwards, and the liquid is produced mainly by vertical drainage. At long times the semilog straight line appears. The confined liquid solutions by Theis (1935) and van Everdingen and Hurst (1949) may be used during the pseudoradial flow period if the flowrate is low. New type curves are presented that yield both vertical and horizontal permeabilities.

  7. Remote down-hole well telemetry

    DOE Patents [OSTI]

    Briles, Scott D.; Neagley, Daniel L.; Coates, Don M.; Freund, Samuel M.

    2004-07-20

    The present invention includes an apparatus and method for telemetry communication with oil-well monitoring and recording instruments located in the vicinity of the bottom of gas or oil recovery pipes. Such instruments are currently monitored using electrical cabling that is inserted into the pipes; cabling has a short life in this environment, and requires periodic replacement with the concomitant, costly shutdown of the well. Modulated reflectance, a wireless communication method that does not require signal transmission power from the telemetry package will provide a long-lived and reliable way to monitor down-hole conditions. Normal wireless technology is not practical since batteries and capacitors have to frequently be replaced or recharged, again with the well being removed from service. RF energy generated above ground can also be received, converted and stored down-hole without the use of wires, for actuating down-hole valves, as one example. Although modulated reflectance reduces or eliminates the loss of energy at the sensor package because energy is not consumed, during the transmission process, additional stored extra energy down-hole is needed.

  8. Sedimentological analysis using geophysical well logs

    SciTech Connect (OSTI)

    Izotova, T.S. )

    1993-09-01

    The application of geophysical well logs in sedimentology and stratigraphic prospecting holds great promise in solving a number of geological problems. A suite of logs provides data on a wide range of rock properties: vertical and lateral variation of resistivity, natural polarization, natural and induced radioactivity, shear strength, and acoustic properties. Each of these properties is controlled by the depositional environment of the sediments and their later diagenesis. The attention of geologists and geophysicists is drawn to new techniques in the interpretation of geophysical well logs for exploration, appraisal, and development of oil and gas fields. The relationship between geophysical logs and depositional environments is explored. Bulk composition, rock structure, and texture and facies variation can be quantified by electric log parameters. Also, the possibility of using logs to demonstrate long- and short-period sedimentary cycles is demonstrated. Methods of sedimentological analysis using geophysical well logs are demonstrated. The importance of a genetic approach in the interpretation of geological sequences and paleogeological reconstructions is emphasized using examples taken from oil and gas prospecting operations in the Ukraine.

  9. Band structure anisotropy in semiconductor quantum wells

    SciTech Connect (OSTI)

    Novotny, S.J.

    1999-03-01

    The focus of this research is an investigation of energy band anisotropy in simple quantum well structures. This anisotropy results from the asymmetry of the periodic potential within the crystal lattice. For sufficiently high doping levels, band structure anisotropy is expected to play an important role in the evaluation of the electronic and optical properties of the quantum well structures. The analysis uses a model based on a 6x6 Luttinger-Kohn k.p approach for bulk material valence band structure together with the Envelope Function Approximation. The model is used to analyze Si/SiGe, AlGaAs/GaAs, and GaAs/InGaAs quantum wells for the 001 and the 110 growth directions. The resulting band structures show significant anisotropy for materials grown in both the 110 and 001 directions. In all cases the materials grown in the 110 direction show a more pronounced anisotropy than the materials grown in the 001 directions. For the 001 growth directions, the band structures were effectively isotropic for values of k-parallel less than 0.4 inverse angstrom for Si/SiGe, 0.6 inverse angstrom for GaAs/AlGaAs, and 0.5 inverse angstrom for InGaAs/GaAs.

  10. IMPROVED NATURAL GAS STORAGE WELL REMEDIATION

    SciTech Connect (OSTI)

    James C. Furness; Donald O. Johnson; Michael L. Wilkey; Lynn Furness; Keith Vanderlee; P. David Paulsen

    2001-12-01

    This report summarizes the research conducted during Budget Period One on the project ''Improved Natural Gas Storage Well Remediation''. The project team consisted of Furness-Newburge, Inc., the technology developer; TechSavants, Inc., the technology validator; and Nicor Technologies, Inc., the technology user. The overall objectives for the project were: (1) To develop, fabricate and test prototype laboratory devices using sonication and underwater plasma to remove scale from natural gas storage well piping and perforations; (2) To modify the laboratory devices into units capable of being used downhole; (3) To test the capability of the downhole units to remove scale in an observation well at a natural gas storage field; (4) To modify (if necessary) and field harden the units and then test the units in two pressurized injection/withdrawal gas storage wells; and (5) To prepare the project's final report. This report covers activities addressing objectives 1-3. Prototype laboratory units were developed, fabricated, and tested. Laboratory testing of the sonication technology indicated that low-frequency sonication was more effective than high-frequency (ultrasonication) at removing scale and rust from pipe sections and tubing. Use of a finned horn instead of a smooth horn improves energy dispersal and increases the efficiency of removal. The chemical data confirmed that rust and scale were removed from the pipe. The sonication technology showed significant potential and technical maturity to warrant a field test. The underwater plasma technology showed a potential for more effective scale and rust removal than the sonication technology. Chemical data from these tests also confirmed the removal of rust and scale from pipe sections and tubing. Focusing of the underwater plasma's energy field through the design and fabrication of a parabolic shield will increase the technology's efficiency. Power delivered to the underwater plasma unit by a sparkplug repeatedly was

  11. Well constructions with inhibited microbial growth and methods of antimicrobial treatment in wells

    DOE Patents [OSTI]

    Lee, Brady D.; Dooley, Kirk J.

    2004-11-02

    The invention includes methods of inhibiting microbial growth in a well. A packing material containing a mixture of a first material and an antimicrobial agent is provided to at least partially fill a well bore. One or more access tubes are provided in an annular space around a casing within the well bore. The access tubes have a first terminal opening located at or above a ground surface and have a length that extends from the first terminal opening at least part of the depth of the well bore. The access tubes have a second terminal opening located within the well bore. An antimicrobial material is supplied into the well bore through the first terminal opening of the access tubes. The invention also includes well constructs.

  12. A Study of Production/Injection Data from Slim Holes and Large-Diameter Wells at the Okuaizu Geothermal Field, Tohoku, Japan

    SciTech Connect (OSTI)

    Renner, Joel Lawrence; Garg, Sabodh K.; Combs, Jim

    2002-06-01

    Discharge from the Okuaizu boreholes is accompanied by in situ boiling. Analysis of cold-water injection and discharge data from the Okuaizu boreholes indicates that the two-phase productivity index is about an order of magnitude smaller than the injectivity index. The latter conclusion is in agreement with analyses of similar data from Oguni, Sumikawa, and Kirishima geothermal fields. A wellbore simulator was used to examine the effect of borehole diameter on the discharge capacity of geothermal boreholes with two-phase feedzones. Based on these analyses, it appears that it should be possible to deduce the discharge characteristics of largediameter wells using test data from slim holes with two-phase feeds.

  13. Potential-well distortion in barrier Rf

    SciTech Connect (OSTI)

    King Ng

    2004-04-29

    Head-tail asymmetry has been observed in the longitudinal beam profiles in the Fermilab Recycler Ring where protons or antiprotons are stored in rf barrier buckets. The asymmetry is caused by the distortion of the rf potential well in the presence of resistive impedance. Gaussian energy distribution can fit the observed asymmetric beam profile but not without discrepancy. It can also fit the measured energy distribution. On the other hand, generalized elliptic distribution gives a better fit to the beam profile. However, it fails to reproduce the observed energy distribution.

  14. Geothermal Reservoir Well Stimulation Program: technology transfer

    SciTech Connect (OSTI)

    Not Available

    1980-05-01

    A literature search on reservoir and/or well stimulation techniques suitable for application in geothermal fields is presented. The literature on stimulation techniques in oil and gas field applications was also searched and evaluated as to its relevancy to geothermal operations. The equivalent low-temperature work documented in the open literature is cited, and an attempt is made to evaluate the relevance of this information as far as high-temperature stimulation work is concerned. Clays play an important role in any stimulation work. Therefore, special emphasis has been placed on clay behavior anticipated in geothermal operations. (MHR)

  15. Dewatering of coalbed methane wells with hydraulic gas pump

    SciTech Connect (OSTI)

    Amani, M.; Juvkam-Wold, H.C.

    1995-12-31

    The coalbed methane industry has become an important source of natural gas production. Proper dewatering of coalbed methane (CBM) wells is the key to efficient gas production from these reservoirs. This paper presents the Hydraulic Gas Pump as a new alternative dewatering system for CBM wells. The Hydraulic Gas Pump (HGP) concept offers several operational advantages for CBM wells. Gas interference does not affect its operation. It resists solids damage by eliminating the lift mechanism and reducing the number of moving parts. The HGP has a flexible production rate and is suitable for all production phases of CBM wells. It can also be designed as a wireline retrievable system. We conclude that the Hydraulic Gas Pump is a suitable dewatering system for coalbed methane wells.

  16. Oil/gas separator for installation at burning wells

    DOE Patents [OSTI]

    Alonso, Carol T.; Bender, Donald A.; Bowman, Barry R.; Burnham, Alan K.; Chesnut, Dwayne A.; Comfort, III, William J.; Guymon, Lloyd G.; Henning, Carl D.; Pedersen, Knud B.; Sefcik, Joseph A.; Smith, Joseph A.; Strauch, Mark S.

    1993-01-01

    An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait's oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

  17. Oil/gas separator for installation at burning wells

    DOE Patents [OSTI]

    Alonso, C.T.; Bender, D.A.; Bowman, B.R.; Burnham, A.K.; Chesnut, D.A.; Comfort, W.J. III; Guymon, L.G.; Henning, C.D.; Pedersen, K.B.; Sefcik, J.A.; Smith, J.A.; Strauch, M.S.

    1993-03-09

    An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait's oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

  18. Third invitational well-testing symposium: well testing in low permeability environments

    SciTech Connect (OSTI)

    Doe, T.W.; Schwarz, W.J.

    1981-03-01

    The testing of low permeability rocks is common to waste disposal, fossil energy resource development, underground excavation, and geothermal energy development. This document includes twenty-six papers and abstracts, divided into the following sessions: opening session, case histories and related phenomena, well test design in low permeability formations, analysis and interpretation of well test data, and instrumentation for well tests. Separate abstracts were prepared for 15 of the 16 papers; the remaining paper has been previously abstracted. (DLC)

  19. H.R. 577: A Bill to amend the Internal Revenue Code of 1986 to provide a tax credit for the production of oil and gas from existing marginal oil and gas wells and from new oil and gas wells. Introduced in the House of Representatives, One Hundred Fourth Congress, First session

    SciTech Connect (OSTI)

    1995-12-31

    This document contains H.R. 577, A Bill to amend the Internal Revenue Code of 1986 to provide a tax credit for the production of oil and gas from existing marginal oil and gas wells and from new oil and gas wells. This Bill was introduced in the House of Representatives, 104th Congress, First Session, January 19, 1995.

  20. S.32: A Bill to amend the Internal Revenue Code of 1986 to provide a tax credit for the production of oil and gas from existing marginal oil and gas wells and from new oil and gas wells. Introduced in the Senate of the United States, One Hundred Fourth Congress, First session

    SciTech Connect (OSTI)

    1995-12-31

    This bill would establish tax credits for the production of oil and natural gas from existing marginal oil or gas wells, and from new oil and gas wells. It does so by adding a section to the Internal Revenue Code of 1986 which spells out the rules, the credit amounts, the scope of the terms used to define such facilities, and other rules.

  1. Two-dimensional nonlinear finite element analysis of well damage due to reservoir compaction, well-to-well interactions, and localization on weak layers

    SciTech Connect (OSTI)

    Hilbert, L.B. Jr.; Fredrich, J.T.; Bruno, M.S.; Deitrick, G.L.; Rouffignac, E.P. de

    1996-05-01

    In this paper the authors present the results of a coupled nonlinear finite element geomechanics model for reservoir compaction and well-to-well interactions for the high-porosity, low strength diatomite reservoirs of the Belridge field near Bakersfield, California. They show that well damage and failures can occur under the action of two distinct mechanisms: shear deformations induced by pore compaction, and subsidence, and shear deformations due to well-to-well interactions during production or water injection. They show such casting damage or failure can be localized to weak layers that slide or slip under shear due to subsidence. The magnitude of shear displacements and surface subsidence agree with field observations.

  2. Spatially indirect excitons in coupled quantum wells

    SciTech Connect (OSTI)

    Lai, Chih-Wei Eddy

    2004-03-01

    Microscopic quantum phenomena such as interference or phase coherence between different quantum states are rarely manifest in macroscopic systems due to a lack of significant correlation between different states. An exciton system is one candidate for observation of possible quantum collective effects. In the dilute limit, excitons in semiconductors behave as bosons and are expected to undergo Bose-Einstein condensation (BEC) at a temperature several orders of magnitude higher than for atomic BEC because of their light mass. Furthermore, well-developed modern semiconductor technologies offer flexible manipulations of an exciton system. Realization of BEC in solid-state systems can thus provide new opportunities for macroscopic quantum coherence research. In semiconductor coupled quantum wells (CQW) under across-well static electric field, excitons exist as separately confined electron-hole pairs. These spatially indirect excitons exhibit a radiative recombination time much longer than their thermal relaxation time a unique feature in direct band gap semiconductor based structures. Their mutual repulsive dipole interaction further stabilizes the exciton system at low temperature and screens in-plane disorder more effectively. All these features make indirect excitons in CQW a promising system to search for quantum collective effects. Properties of indirect excitons in CQW have been analyzed and investigated extensively. The experimental results based on time-integrated or time-resolved spatially-resolved photoluminescence (PL) spectroscopy and imaging are reported in two categories. (i) Generic indirect exciton systems: general properties of indirect excitons such as the dependence of exciton energy and lifetime on electric fields and densities were examined. (ii) Quasi-two-dimensional confined exciton systems: highly statistically degenerate exciton systems containing more than tens of thousands of excitons within areas as small as (10 micrometer){sup 2} were

  3. Orifice well safety valve with release mechanism

    SciTech Connect (OSTI)

    Blizzard, W.A. Jr.

    1991-07-09

    This patent describes an orifice well safety valve. It comprises a housing having a bore therethrough, a valve element connected to the housing and movable between open and closed positions in the bore, a flow tube telescopically movable in the housing for controlling the movement of the valve element, coiled spring means positioned between the housing and the flow tube for yieldably moving the tube in a direction for opening the valve, a choke bean connected to the flow tube, releasable latch means in the housing releasably engaging the flow tube, belleville spring means biasing the latch means in a direction yieldably opposing the movement of the tube in a direction for closing the valve, the belleville spring remaining out of engagement with the flow tube.

  4. Foreign Travel Health & Wellness Information | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Wellness Programs » Foreign Travel Health & Wellness Information Foreign Travel Health & Wellness Information All travelers should take the following precautions, no matter the destination: Wash hands often with soap and water. Because motor vehicle crashes are a leading cause of injury among travelers, walk and drive defensively; avoid travel at night if possible and always use seat belts. Don't eat or drink dairy products unless you know they have been pasteurized. Never eat

  5. Sustainability Assessment of Workforce Well-Being and Mission Readiness |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Sustainability Assessment of Workforce Well-Being and Mission Readiness Sustainability Assessment of Workforce Well-Being and Mission Readiness Presentation by Dr. Jodi Jacobsen, Associate Professor, University of Maryland, Baltimore September 2008 Sustainability Assessment of Workforce Well-being and Mission Readiness (1.21 MB) More Documents & Publications Moving Away from Silos Health and Productivity Questionnaire (HPQ) Survey Report Focus Group Meeting

  6. Horizontal-well pilot waterflood tests shallow, abandoned field

    SciTech Connect (OSTI)

    McAlpine, J.L. ); Joshi, S.D. )

    1991-08-05

    This paper reports on the suitability of using horizontal wells in a waterflood of shallow, partially depleted sands which will be tested in the Jennings field in Oklahoma. The vertical wells drilled in the Jennings field intersect several well-known formations such as Red Fork, Misner, and Bartlesville sand. Most of these formations have been produced over a number of years, and presently no wells are producing in the field. In the 1940s, 1950s, and 1960s, wells were drilled on 10-acre spacing, and the last well was plugged in 1961. The field was produced only on primary production and produced approximately 1 million bbl of oil. Because the field was not waterflooded, a large potential exists to produce from the field using secondary methods. To improve the economics for the secondary process, a combination of horizontal and vertical wells was considered.

  7. Technology for Increasing Geothermal Energy Productivity. Computer Models to Characterize the Chemical Interactions of Goethermal Fluids and Injectates with Reservoir Rocks, Wells, Surface Equiptment

    SciTech Connect (OSTI)

    Nancy Moller Weare

    2006-07-25

    This final report describes the results of a research program we carried out over a five-year (3/1999-9/2004) period with funding from a Department of Energy geothermal FDP grant (DE-FG07-99ID13745) and from other agencies. The goal of research projects in this program were to develop modeling technologies that can increase the understanding of geothermal reservoir chemistry and chemistry-related energy production processes. The ability of computer models to handle many chemical variables and complex interactions makes them an essential tool for building a fundamental understanding of a wide variety of complex geothermal resource and production chemistry. With careful choice of methodology and parameterization, research objectives were to show that chemical models can correctly simulate behavior for the ranges of fluid compositions, formation minerals, temperature and pressure associated with present and near future geothermal systems as well as for the very high PT chemistry of deep resources that is intractable with traditional experimental methods. Our research results successfully met these objectives. We demonstrated that advances in physical chemistry theory can be used to accurately describe the thermodynamics of solid-liquid-gas systems via their free energies for wide ranges of composition (X), temperature and pressure. Eight articles on this work were published in peer-reviewed journals and in conference proceedings. Four are in preparation. Our work has been presented at many workshops and conferences. We also considerably improved our interactive web site (geotherm.ucsd.edu), which was in preliminary form prior to the grant. This site, which includes several model codes treating different XPT conditions, is an effective means to transfer our technologies and is used by the geothermal community and other researchers worldwide. Our models have wide application to many energy related and other important problems (e.g., scaling prediction in petroleum

  8. Exploratory Well At Raft River Geothermal Area (1976) | Open...

    Open Energy Info (EERE)

    well production was tested. Down-hole data was obtained from RRGE-3. References Speake, J.L. (1 August 1976) Raft River Geothermal Exploratory Hole No. 2, RRGE-2. Completion...

  9. Inspecting coiled tubing for well operations

    SciTech Connect (OSTI)

    Gard, M.F.; Pasternack, E.S.; Smith, L.J.

    1992-02-18

    This patent describes improvement in a coiled tubing system for insertion of a substantially continuous bendable length of metal tubing into and withdrawal from a wellbore, the system including a tubing injection unit disposed for injecting the length of tubing into the well bore and storage means for dispensing the length of tubing and receiving the length of tubing from the injection unit. The improvement includes: tubing inspection apparatus for substantially continuously inspecting the wall section of the tubing to detect cracks and structural defects which may lead to tubing failure, the apparatus comprising: a source of electromagnetic radiation mounted in proximity to the tubing between the injection unit and a wellhead into which the tubing is injected; a radiation detector unit for receiving signals from the source which have been projected through the wall of the tubing; means for receiving signals form the detector unit for monitoring the structural integrity o the wall of the tubing during one of injecting and withdrawing the tubing with respect to the wellhead; and housing means supported for rotation about a longitudinal axis of the tubing.

  10. How gelation affects oil well cements

    SciTech Connect (OSTI)

    Kieffer, J.; Rae, P.

    1987-05-01

    One of the most common problems seen in the oil industry is that of cement gelation. Gelation can be defined as a premature viscosification or a gel-strength buildup of the cement slurry. This can have important consequences in field operations and may be so severe as to cause job failure. One of the principal difficulties encountered in dealing with cement gelation is the unpredictable nature of the phenomenon and the fact that it may manifest itself under a variety of field conditions. Thus, it may occur immediately after mixing or during the displacement when the slurry has reached circulating temperature; it occasionally is seen only during shutdowns, when the slurry is in static condition, but may appear during pumping when the slurry is under continual shear. The fact that the physico-chemical bases of gelation are complex probably accounts for the broad spectrum of conditions under which gelation can occur. Factors involved include the chemical composition of the cement powder itself, its fineness, its microstructure, the mixwater quality, the types (if any) of additive used, the rate of heat flux into the slurry as well as the final temperature to which the slurry is exposed.

  11. Testing of the Pleasant Bayou Well through October 1990

    SciTech Connect (OSTI)

    Randolph, P.L.; Hayden, C.G.; Mosca, V.L.; Anhaiser, J.L.

    1992-08-01

    Pleasant Bayou location was inactive from 1983 until the cleanout of the production and disposal wells in 1986. The surface facilities were rehabilitated and after shakedown of the system, additional repair of wellhead valves, and injection of an inhibitor pill, continuous long-term production was started in 1988. Over two years of production subsequent to that are reviewed here, including: production data, brine sampling and analysis, hydrocarbon sampling and analysis, solids sampling and analysis, scale control and corrosion monitoring and control.

  12. Pantex Protective Force hailed as "well prepared, well trained" |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) Protective Force hailed as "well prepared, well trained" Wednesday, November 25, 2015 - 9:15am successfully completed a recent assessment by the U.S. Department Members of Pantex's Protective Force on the firing range. The Protective Force successfully completed a recent assessment by the U.S. Department of Energy's Office of Enterprise Assessments. The Pantex Plant recently hosted the U.S. Department of Energy's Office of

  13. Imbibition well stimulation via neural network design

    DOE Patents [OSTI]

    Weiss, William

    2007-08-14

    A method for stimulation of hydrocarbon production via imbibition by utilization of surfactants. The method includes use of fuzzy logic and neural network architecture constructs to determine surfactant use.

  14. Novel coiled tubing application controls large LPG storage well fire

    SciTech Connect (OSTI)

    Gebhardt, F.; Eby, D.; Barnett, D.

    1996-06-01

    Conventional well control techniques for normal oil and gas wells are widely known and have been presented on numerous occasions. However, LPG storage (or cavern) wells rarely blow out and/or catch on fire. As a result, little information has been presented on the topic of well control for these types of wells. This article chronicles a case history of a high-volume liquid propane storage well fire. Because conventional wellhead removal methods could not be applied in this case, the capping/kill plan called for use of coiled tubing in a novel manner to cut the tubing downhole and install an inflatable packer to shut off propane flow. The plan was successfully executed, saving the operator millions of dollars in LPC product loss and cost of control.

  15. Well test imaging - a new method for determination of boundaries from well test data

    SciTech Connect (OSTI)

    Slevinsky, B.A.

    1997-08-01

    A new method has been developed for analysis of well test data, which allows the direct calculation of the location of arbitrary reservoir boundaries which are detected during a well test. The method is based on elements of ray tracing and information theory, and is centered on the calculation of an instantaneous {open_quote}angle of view{close_quote} of the reservoir boundaries. In the absence of other information, the relative reservoir shape and boundary distances are retrievable in the form of a Diagnostic Image. If other reservoir information, such as 3-D seismic, is available; the full shape and orientation of arbitrary (non-straight line or circular arc) boundaries can be determined in the form of a Reservoir Image. The well test imaging method can be used to greatly enhance the information available from well tests and other geological data, and provides a method to integrate data from multiple disciplines to improve reservoir characterization. This paper covers the derivation of the analytical technique of well test imaging and shows examples of application of the technique to a number of reservoirs.

  16. Customized Well Test Methods for a Non-Customary Geothermal Well

    SciTech Connect (OSTI)

    Burr, Myron

    1986-01-21

    Recent testing of Thermal 4, The Geysers blowout well, has shown that the flow has two different components: a low enthalpy, mineral-laden flow from a well drilled within the existing wellhead and a high flowrate, high enthalpy annular flow. The commingled flows were mechanically separated and individually tested. The results of the test show that the flows are from two very different sources that are in weak hydraulic communication. Work is in progress to apply this information to bring Thermal 4 within compliance of the 1986 air quality regulations.

  17. Current and proposed regulations for salt-water disposal wells

    SciTech Connect (OSTI)

    Moody, T.

    1994-12-31

    In recent years, all aspects of hydrocarbon exploration and production (E&P) activities have drawn closer scrutiny in terms of existing and potential impairment of the environment. In addition to drilling, production, and transportation activities, the United States Environmental Protection Agency (USEPA) has focused on the nature of E&P wastes. Approximately 98% of the volume of wastes generated by E&P activities is salt water associated with the recovery of hydrocarbons. By far the majority of this waste is reinjected in Class II wells as a nonhazardous waste. Due to the tremendous volume of salt water disposed of in Class II injection wells, the USEPA continues to reevaluate the Federal salt-water injection well program, offering comments, revising its interpretation of existing regulations, and promulgating new regulations. The purpose of this paper is to provide a review of existing Federal Class II injection well regulations and to provide an overview of potential of newly promulgated regulations.

  18. Practical Methods for Locating Abandoned Wells in Populated Areas

    SciTech Connect (OSTI)

    Veloski, G.A.; Hammack, R.W.; Lynn, R.J.

    2007-09-01

    An estimated 12 million wells have been drilled during the 150 years of oil and gas production in the United States. Many old oil and gas fields are now populated areas where the presence of improperly plugged wells may constitute a hazard to residents. Natural gas emissions from wells have forced people from their houses and businesses and have caused explosions that injured or killed people and destroyed property. To mitigate this hazard, wells must be located and properly plugged, a task made more difficult by the presence of houses, businesses, and associated utilities. This paper describes well finding methods conducted by the National Energy Technology Laboratory (NETL) that were effective at two small towns in Wyoming and in a suburb of Pittsburgh, Pennsylvania.

  19. Well cleanup and completion method and apparatus

    SciTech Connect (OSTI)

    George, F. R.; Brieger, E. F.

    1985-04-16

    A cased borehole has a perforating gun suspended in underlying relationship relative to a packer device. A tubing string has a seal assembly connected to the lower end thereof, and an extension tube downwardly extends from the seal assembly. A seal housing is connected to the packer and receives the seal assembly therewithin. The tubing string is run downhole until the end of the extension tube is in proximity of a gun firing head while the seal assembly is unseated from the housing, so that the fluid in proximity of the gun firing head is displaced with clean fluid which flows from the surface, down the tubing string, and out of the end of the extension tube. After the gun firing head is cleaned, the tubing is lowered, the seal assembly is sealingly received within the seal housing, and the gun firing head is actuated by lowering a gun firing device down through the interior of the tubing string, seal assembly, and extension tube, thereby perforating the casing so that production flows from a payzone, through the perforations, into the lower annulus, through a one-way valve of the seal housing, and up the tubing string to the surface of the earth.

  20. U.S. Average Depth of Crude Oil Exploratory Wells Drilled (Feet per Well)

    Gasoline and Diesel Fuel Update (EIA)

    Wells Drilled (Feet per Well) U.S. Average Depth of Crude Oil Exploratory Wells Drilled (Feet per Well) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1940's 4,232 1950's 4,335 4,609 4,781 4,761 4,740 4,819 4,901 5,036 4,993 5,021 1960's 5,170 5,099 5,124 4,878 5,509 5,672 5,700 5,758 5,914 6,054 1970's 6,247 5,745 5,880 6,243 5,855 5,913 6,010 5,902 6,067 6,011 1980's 5,727 5,853 5,504 5,141 5,565 5,865 6,069 6,104 6,182 6,028 1990's 6,838 6,641 6,930 6,627 6,671

  1. U.S. Average Depth of Dry Holes Developmental Wells Drilled (Feet per Well)

    Gasoline and Diesel Fuel Update (EIA)

    Developmental Wells Drilled (Feet per Well) U.S. Average Depth of Dry Holes Developmental Wells Drilled (Feet per Well) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1940's 3,225 1950's 3,077 3,255 3,520 3,401 3,512 3,699 3,574 3,605 3,631 3,844 1960's 3,889 3,782 4,239 4,143 4,207 4,446 3,900 3,901 4,311 4,437 1970's 4,714 4,633 4,725 4,851 4,599 4,415 4,439 4,662 4,600 4,517 1980's 4,214 4,226 4,184 3,974 4,205 4,306 4,236 4,390 4,704 4,684 1990's 4,755 4,629

  2. U.S. Average Depth of Dry Holes Exploratory Wells Drilled (Feet per Well)

    Gasoline and Diesel Fuel Update (EIA)

    Exploratory Wells Drilled (Feet per Well) U.S. Average Depth of Dry Holes Exploratory Wells Drilled (Feet per Well) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1940's 3,658 1950's 3,733 4,059 4,334 4,447 4,408 4,498 4,425 4,488 4,449 4,602 1960's 4,575 4,799 4,790 4,933 4,980 5,007 5,117 5,188 5,589 5,739 1970's 5,700 5,796 5,882 5,808 5,649 5,674 5,607 5,605 5,812 5,716 1980's 5,533 5,582 5,367 4,800 5,178 5,317 5,447 5,294 5,748 5,579 1990's 5,685 5,658 5,480

  3. U.S. Average Depth of Natural Gas Exploratory Wells Drilled (Feet per Well)

    Gasoline and Diesel Fuel Update (EIA)

    Wells Drilled (Feet per Well) U.S. Average Depth of Natural Gas Exploratory Wells Drilled (Feet per Well) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1940's 5,682 1950's 5,466 5,497 6,071 5,654 6,059 5,964 6,301 6,898 6,657 6,613 1960's 6,298 6,457 6,728 6,370 7,547 7,295 8,321 7,478 7,697 8,092 1970's 7,695 7,649 7,400 6,596 6,456 6,748 6,777 6,625 6,662 6,630 1980's 6,604 6,772 6,921 6,395 6,502 6,787 6,777 6,698 6,683 6,606 1990's 7,100 7,122 6,907 6,482 6,564

  4. U.S. Nominal Cost per Dry Well Drilled (Thousand Dollars per Well)

    Gasoline and Diesel Fuel Update (EIA)

    Dry Well Drilled (Thousand Dollars per Well) U.S. Nominal Cost per Dry Well Drilled (Thousand Dollars per Well) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1960's 44.0 45.2 50.8 48.2 48.5 53.1 56.9 61.5 66.2 70.2 1970's 80.9 86.8 94.9 105.8 141.7 177.2 190.3 230.2 281.7 339.6 1980's 376.5 464.0 515.4 366.5 329.2 372.3 389.2 259.1 366.4 355.4 1990's 367.5 441.2 357.6 387.7 491.5 481.2 541.0 655.6 973.2 1,115.5 2000's 1,075.4 1,620.4 1,673.4 2,065.1 1,977.3 2,392.9

  5. U.S. Nominal Cost per Natural Gas Well Drilled (Thousand Dollars per Well)

    Gasoline and Diesel Fuel Update (EIA)

    Natural Gas Well Drilled (Thousand Dollars per Well) U.S. Nominal Cost per Natural Gas Well Drilled (Thousand Dollars per Well) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1960's 102.7 94.7 97.1 92.4 104.8 101.9 133.8 141.0 148.5 154.3 1970's 160.7 166.6 157.8 155.3 189.2 262.0 270.4 313.5 374.2 443.1 1980's 536.4 698.6 864.3 608.1 489.8 508.7 522.9 380.4 460.3 457.8 1990's 471.3 506.6 426.1 521.2 535.1 629.7 616.0 728.6 815.6 798.4 2000's 756.9 896.5 991.9

  6. Multifunctional Corrosion-resistant Foamed Well Cement Composites...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multifunctional Corrosion-resistant Foamed Well Cement Composites Multifunctional Corrosion-resistant Foamed Well Cement Composites Multifunctional Corrosion-resistant Foamed Well ...

  7. Energetic Materials for EGS Well Stimulation (solids, liquids...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energetic Materials for EGS Well Stimulation (solids, liquids, gases) Energetic Materials for EGS Well Stimulation (solids, liquids, gases) Energetic Materials for EGS Well ...

  8. Single well tracer method to evaluate enhanced recovery

    DOE Patents [OSTI]

    Sheely, Jr., Clyde Q.; Baldwin, Jr., David E.

    1978-01-01

    Data useful to evaluate the effectiveness of or to design an enhanced recovery process (the recovery process involving mobilizing and moving hydrocarbons through a hydrocarbon-bearing subterranean formation from an injection well to a production well by injecting a mobilizing fluid into the injection well) are obtained by a process which comprises sequentially: determining hydrocarbon saturation in the formation in a volume in the formation near a well bore penetrating the formation, injecting sufficient of the mobilizing fluid to mobilize and move hydrocarbons from a volume in the formation near the well bore penetrating the formation, and determining by the single well tracer method a hydrocarbon saturation profile in a volume from which hydrocarbons are moved. The single well tracer method employed is disclosed by U.S. Pat. No. 3,623,842. The process is useful to evaluate surfactant floods, water floods, polymer floods, CO.sub.2 floods, caustic floods, micellar floods, and the like in the reservoir in much less time at greatly reduced costs, compared to conventional multi-well pilot test.

  9. Cost-Effective Fabrication Routes for the Production of Quantum Well Structures and Recovery of Waste Heat from Heavy Duty Trucks

    SciTech Connect (OSTI)

    Willigan, Rhonda

    2009-09-30

    The primary objectives of Phase I were: (a) carry out cost, performance and system level models, (b) quantify the cost benefits of cathodic arc and heterogeneous nanocomposites over sputtered material, (c) evaluate the expected power output of the proposed thermoelectric materials and predict the efficiency and power output of an integrated TE module, (d) define market acceptance criteria by engaging Caterpillar's truck OEMs, potential customers and dealers and identify high-level criteria for a waste heat thermoelectric generator (TEG), (e) identify potential TEG concepts, and (f) establish cost/kWatt targets as well as a breakdown of subsystem component cost targets for the commercially viable TEG.

  10. RAPID/Geothermal/Well Field/Texas | Open Energy Information

    Open Energy Info (EERE)

    wells. A geothermal well is a well drilled within the established limits of a designated geothermal field. 16 TAC 3.79. If the proposed well is located in a Texas Groundwater...

  11. Geothermal reservoir well stimulation program. Final program summary report

    SciTech Connect (OSTI)

    Not Available

    1984-01-01

    Eight field experiments and the associated theoretical and laboratory work performed to develop the stimulation technology are described. A discussion of the pre-stimulation and post-stimulation data and their evaluation is provided for each experiment. Overall results have shown that stimulation is viable where adequate reservoirs are penetrated by wells encountering formation damage or locally tight formation zones. Seven of the eight stimulation experiments were at least technically successful in stimulating the wells. The two fracture treatments in East Mesa 58-30 more than doubled the producing rate of the previously marginal producer. The two fracture treatments at Raft River and the two at Baca were all successful in obtaining significant production from previously nonproductive intervals. However, these treatments failed to establish commercial production due to deficiencies in either fluid temperature or reservoir transmissivity. The Beowawe chemical stimulation treatment appears to have significantly improved the well's injectivity, but production data were not obtained because of well mechanical problems. The acid etching treatment in the well at the Geysers did not have any material effect on producing rate. Evaluations of the field experiments to date have suggested improvements in treatment design and treatment interval selection which offer substantial encouragement for future stimulation work.

  12. Testing geopressured geothermal reservoirs in existing wells: Pauline Kraft Well No. 1, Nueces County, Texas. Final report

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    The Pauline Kraft Well No. 1 was originally drilled to a depth of 13,001 feet and abandoned as a dry hole. The well was re-entered in an effort to obtain a source of GEO/sup 2/ energy for a proposed gasohol manufacturing plant. The well was tested through a 5-inch by 2-3/8 inch annulus. The geological section tested was the Frio-Anderson sand of Mid-Oligocene age. The interval tested was from 12,750 to 12,860 feet. A saltwater disposal well was drilled on the site and completed in a Micocene sand section. The disposal interval was perforated from 4710 to 4770 feet and from 4500 to 4542 feet. The test well failed to produce water at substantial rates. Initial production was 34 BWPD. A large acid stimulation treatment increased productivity to 132 BWPD, which was still far from an acceptable rate. During the acid treatment, a failure of the 5-inch production casing occurred. The poor production rates are attributed to a reservoir with very low permeability and possible formation damage. The casing failure is related to increased tensile strain resulting from cooling of the casing by acid and from the high surface injection pressure. The location of the casing failure is now known at this time, but it is not at the surface. Failure as a result of a defect in a crossover joint at 723 feet is suspected.

  13. Controls for offshore high pressure corrosive gas wells

    SciTech Connect (OSTI)

    Bailliet, R.M.

    1982-01-01

    In September 1981, Shell Oil Company began production from its first high-pressure corrosive gas well in the Gulf of Mexico. The extreme pressures and corrosive nature of the gas required the installation of a 20,000 psi low alloy steel christmas tree, equipped with 12 hydraulically operated safety and control valves. This study describes the instrumentation and control system developed to operate this complex well. Similar wells have been produced on shore, but the limited space available on an offshore platform has required the development of new techniques for operating these wells. The instrumentation system described utilizes conventional pneumatics and hydraulics for control plus intrinsically-safe electronics for data acquisition. The use of intrinsically-safe field wiring provided maximum safety while avoiding the need for explosion-proof conduit and wiring methods in division one hazardous areas.

  14. Coiled tubing workover saves horizontal well in Lake Maracaibo

    SciTech Connect (OSTI)

    Lizak, K.; Patterson, J.; Suarez, D.; Salas, J.

    1996-12-31

    A slotted liner horizontal completion became stuck while being run. Inflatable packers were to be used to isolate the productive interval from a water-bearing, unconsolidated sand in the curved section of this well. While personnel were deciding how to cement the well, the liner was left in the hole with the inflatable packers unset, and the production tubing was run. Coiled tubing was used to log the well, isolate the productive interval, and remove damage to restore well productivity. Personnel considered all possible options, and a thorough decision-making process guided the workover. Because of severe lost-circulation problems, extensive ``what if`` scenarios were made and updated daily for the engineers on location. Service company and oil company personnel worked together to guarantee the job designs were practical and did not exceed the limits of the equipment on location. Computer simulations of all operations were run to allow corrective action to be taken if unusual circumstances arose. All fluids were thoroughly laboratory tested and witnessed by oil company personnel to ensure job success. Problems on the job included lost circulation, locating the exact positions of the packers and water zone, ensuring correct cement placement, removing mud and workover fluids without damaging the squeeze, and bad weather on Lake Maracaibo. Advantages and disadvantages of all the solutions that were considered are included to assist anyone in a similar situation. Post-job oil production has stabilized at 900 BOPD with no water or sand production. Careful job planning and the versatility of coiled tubing saved this well and proved economical with an estimated payout of 33 days, assuming a price of $12 per barrel of oil.

  15. Case history of the Cormorant field single satellite well

    SciTech Connect (OSTI)

    Brommer, J.J.; Fernandinho, C.M.M.S.; Liles, J.R.

    1982-01-01

    A case history of the development of specifically tailor-made equipment and the experience gained from the installation and production from the first subsea well in the central area of the Cormorant field is presented. Emphasis is placed on development concepts and the equipment uniquely manufactured to meet special needs. A one-year onshore integrated system test of the equipment is described along with the interface problems identified and resolved prior to going offshore. Actual installation and commissioning activities are fully covered including drilling, completion, and production from the well. The study describes the major reasons for the success of the subsea well to date as being extensive onshore testing, detailed planning, and the early involvement of operating personnel.

  16. Fallon FORGE GIS and Downhole Well Lithology Data

    SciTech Connect (OSTI)

    Doug Blankenship

    2015-12-23

    ArcGIS Map Package with MT Station Locations, 2D Seismic Lines, Well data, Known Regional Hydrothermal Systems, Regional Historic Earthquake Seismicity, Regional Temperature Gradient Data, Regional Heat Flow Data, Regional Radiogenic Heat Production, Local Geology, Land Status, Cultural Data, 2m Temperature Probe Data, and Gravity Data. Also a detailed down-hole lithology notes are provided.

  17. Program calculates economic limit for oil and gas wells

    SciTech Connect (OSTI)

    Juran, K.P.

    1986-10-01

    A program written for the HP-41 CV/CX computer may be used to make a quick evaluation of when an oil or gas well's production rate will cease to be economical. The article lists data necessary for performing the calculation, equations used and the programs's steps. In addition, user instructions and three sample problems are included.

  18. Development of an Improved Cement for Geothermal Wells

    SciTech Connect (OSTI)

    Trabits, George

    2015-04-20

    After an oil, gas, or geothermal production well has been drilled, the well must be stabilized with a casing (sections of steel pipe that are joined together) in order to prevent the walls of the well from collapsing. The gap between the casing and the walls of the well is filled with cement, which locks the casing into place. The casing and cementing of geothermal wells is complicated by the harsh conditions of high temperature, high pressure, and a chemical environment (brines with high concentrations of carbon dioxide and sulfuric acid) that degrades conventional Portland cement. During the 1990s and early 2000s, the U.S. Department of Energy’s Geothermal Technologies Office (GTO) provided support for the development of fly-ash-modified calcium aluminate phosphate (CaP) cement, which offers improved resistance to degradation compared with conventional cement. However, the use of CaP cements involves some operational constraints that can increase the cost and complexity of well cementing. In some cases, CaP cements are incompatible with chemical additives that are commonly used to adjust cement setting time. Care must also be taken to ensure that CaP cements do not become contaminated with leftover conventional cement in pumping equipment used in conventional well cementing. With assistance from GTO, Trabits Group, LLC has developed a zeolite-containing cement that performs well in harsh geothermal conditions (thermal stability at temperatures of up to 300°C and resistance to carbonation) and is easy to use (can be easily adjusted with additives and eliminates the need to “sterilize” pumping equipment as with CaP cements). This combination of properties reduces the complexity/cost of well cementing, which will help enable the widespread development of geothermal energy in the United States.

  19. Coiled tubing isolates zones, fractures wells with single trip service

    SciTech Connect (OSTI)

    Silverman, S.A.

    1999-04-01

    A system has been devised that combines high pressure coiled tubing (CT) and a selective isolation technique to frac multiple zones in a single operation. Multiple zones in one well can be individually isolated, fractured and flowed back simultaneously which results in reduced exposure to kill fluids and therefore higher retained conductivity for newly created fractures. The technique has been named CoilFRAC{trademark} by Dowell. The key benefits to the entire operation are reduced rig and operations time compared to conventional fracturing processes. Time savings, increased production, and environmental benefits are the economic drivers that result in rapid return on investment for production operators. The single trip concept for perforating and stimulation crews also brings additional benefits over multiple mobilizations. Wells which previously had only major zones perforated and stimulated and which are currently depleted can be revived economically using this system, giving the well a second life. The paper describes the equipment and its safety and contingency features, optimized shallow gas production in Alberta, and results from a South Texas oil well fracturing.

  20. South Dakota Natural Gas Gross Withdrawals from Coalbed Wells (Million

    U.S. Energy Information Administration (EIA) Indexed Site

    Cubic Feet) Coalbed Wells (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 0 0 0 2010's 0 0 0 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 8/31/2016 Next Release Date: 9/30/2016 Referring Pages: Natural Gas Gross Withdrawals from Coalbed Wells South Dakota Natural Gas Gross Withdrawals and Production Natural Gas Gross Withdrawals from

  1. Hydrogen Pathways: Cost, Well-to-Wheels Energy Use, and Emissions for the Current Technology Status of Seven Hydrogen Production, Delivery, and Distribution Scenarios

    SciTech Connect (OSTI)

    Ruth, M.; Laffen, M.; Timbario, T. A.

    2009-09-01

    Report of levelized cost in 2005 U.S. dollars, energy use, and GHG emission benefits of seven hydrogen production, delivery, and distribution pathways.

  2. Hydrogen Pathways. Cost, Well-to-Wheels Energy Use, and Emissions for the Current Technology Status of Seven Hydrogen Production, Delivery, and Distribution Scenarios

    SciTech Connect (OSTI)

    Ruth, Mark; Laffen, Melissa; Timbario, Thomas A.

    2009-09-01

    Report of levelized cost in 2005 U.S. dollars, energy use, and GHG emission benefits of seven hydrogen production, delivery, and distribution pathways.

  3. Hydrogen Pathways: Cost, Well-to-Wheels Energy Use, and Emissions for the Current Technology Status of Seven Hydrogen Production, Delivery, and Distribution Scenarios

    Fuel Cell Technologies Publication and Product Library (EERE)

    Report of levelized cost in 2005 U.S. dollars, energy use, and GHG emission benefits of seven hydrogen production, delivery, and distribution pathways.

  4. Hydrogen Pathways: Cost, Well-to-Wheels Energy Use, and Emissions for the Current Technology Status of Seven Hydrogen Production, Delivery, and Distribution Scenarios

    Office of Energy Efficiency and Renewable Energy (EERE)

    Report of levelized cost in 2005 US dollars, energy use, and GHG emission benefits of seven hydrogen production, delivery, and distribution pathways.

  5. Geothermally Coupled Well-Based Compressed Air Energy Storage

    SciTech Connect (OSTI)

    Davidson, Casie L.; Bearden, Mark D.; Horner, Jacob A.; Cabe, James E.; Appriou, Delphine; McGrail, B. Peter

    2015-12-20

    Previous work by McGrail et al. (2013, 2015) has evaluated the possibility of pairing compressed air energy storage with geothermal resources in lieu of a fossil-fired power generation component, and suggests that such applications may be cost competitive where geology is favorable to siting both the geothermal and CAES components of such a system. Those studies also note that the collocation of subsurface resources that meet both sets of requirements are difficult to find in areas that also offer infrastructure and near- to mid-term market demand for energy storage. This study examines a novel application for the compressed air storage portion of the project by evaluating the potential to store compressed air in disused wells by amending well casings to serve as subsurface pressure vessels. Because the wells themselves would function in lieu of a geologic storage reservoir for the CAES element of the project, siting could focus on locations with suitable geothermal resources, as long as there was also existing wellfield infrastructure that could be repurposed for air storage. Existing wellfields abound in the United States, and with current low energy prices, many recently productive fields are now shut in. Should energy prices remain stagnant, these idle fields will be prime candidates for decommissioning unless they can be transitioned to other uses, such as redevelopment for energy storage. In addition to the nation’s ubiquitous oil and gas fields, geothermal fields, because of their phased production lifetimes, also may offer many abandoned wellbores that could be used for other purposes, often near currently productive geothermal resources. These existing fields offer an opportunity to decrease exploration and development uncertainty by leveraging data developed during prior field characterization, drilling, and production. They may also offer lower-cost deployment options for hybrid geothermal systems via redevelopment of existing well-field infrastructure

  6. Geothermally Coupled Well-Based Compressed Air Energy Storage

    SciTech Connect (OSTI)

    Davidson, C L; Bearden, Mark D; Horner, Jacob A; Appriou, Delphine; McGrail, B Peter

    2015-12-01

    Previous work by McGrail et al. (2013, 2015) has evaluated the possibility of pairing compressed air energy storage with geothermal resources in lieu of a fossil-fired power generation component, and suggests that such applications may be cost competitive where geology is favorable to siting both the geothermal and CAES components of such a system. Those studies also note that the collocation of subsurface resources that meet both sets of requirements are difficult to find in areas that also offer infrastructure and near- to mid-term market demand for energy storage. This study examines a novel application for the compressed air storage portion of the project by evaluating the potential to store compressed air in disused wells by amending well casings to serve as subsurface pressure vessels. Because the wells themselves would function in lieu of a geologic storage reservoir for the CAES element of the project, siting could focus on locations with suitable geothermal resources, as long as there was also existing wellfield infrastructure that could be repurposed for air storage. Existing wellfields abound in the United States, and with current low energy prices, many recently productive fields are now shut in. Should energy prices remain stagnant, these idle fields will be prime candidates for decommissioning unless they can be transitioned to other uses, such as redevelopment for energy storage. In addition to the nation’s ubiquitous oil and gas fields, geothermal fields, because of their phased production lifetimes, also may offer many abandoned wellbores that could be used for other purposes, often near currently productive geothermal resources. These existing fields offer an opportunity to decrease exploration and development uncertainty by leveraging data developed during prior field characterization, drilling, and production. They may also offer lower-cost deployment options for hybrid geothermal systems via redevelopment of existing well-field infrastructure

  7. Property:FirstWellLog | Open Energy Information

    Open Energy Info (EERE)

    FirstWellLog Jump to: navigation, search Property Name FirstWellLog Property Type Page Retrieved from "http:en.openei.orgwindex.php?titleProperty:FirstWellLog&oldid598766...

  8. City of Wells, Minnesota (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    Wells Address: 101 First Street SE Place: Wells, MN Zip: 56097 Phone Number: 507-553-3119 Website: www.cityofwells.net Twitter: @CityofWellsMN Outage Hotline: 507-553-3197...

  9. UTM Well Coordinates for the Boise Hydrogeophysical Research Site (BHRS)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    David Lim

    A series of oscillatory pumping tests were performed at the BHRS. The data collected from these wells will be used to tomographically image the shallow subsurface. This excel file only contains well coordinates for all wells at the Boise site.

  10. RAPID/Geothermal/Well Field/Alaska | Open Energy Information

    Open Energy Info (EERE)

    At a Glance Jurisdiction: Alaska Drilling & Well Field Permit Agency: Alaska Division of Oil and Gas Drilling & Well Field Permit All wells drilled in support or in search of the...

  11. Dixie Valley Six Well Flow Test | Open Energy Information

    Open Energy Info (EERE)

    Six Well Flow Test Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: Dixie Valley Six Well Flow Test Abstract A six well flow test was conducted...

  12. UTM Well Coordinates for the Boise Hydrogeophysical Research Site (BHRS)

    SciTech Connect (OSTI)

    David Lim

    2014-12-19

    A series of oscillatory pumping tests were performed at the BHRS. The data collected from these wells will be used to tomographically image the shallow subsurface. This excel file only contains well coordinates for all wells at the Boise site.

  13. Zero Discharge Water Management for Horizontal Shale Gas Well Development

    SciTech Connect (OSTI)

    Paul Ziemkiewicz; Jennifer Hause; Raymond Lovett; David Locke Harry Johnson; Doug Patchen

    2012-03-31

    Hydraulic fracturing technology (fracking), coupled with horizontal drilling, has facilitated exploitation of huge natural gas (gas) reserves in the Devonian-age Marcellus Shale Formation (Marcellus) of the Appalachian Basin. The most-efficient technique for stimulating Marcellus gas production involves hydraulic fracturing (injection of a water-based fluid and sand mixture) along a horizontal well bore to create a series of hydraulic fractures in the Marcellus. The hydraulic fractures free the shale-trapped gas, allowing it to flow to the well bore where it is conveyed to pipelines for transport and distribution. The hydraulic fracturing process has two significant effects on the local environment. First, water withdrawals from local sources compete with the water requirements of ecosystems, domestic and recreational users, and/or agricultural and industrial uses. Second, when the injection phase is over, 10 to 30% of the injected water returns to the surface. This water consists of flowback, which occurs between the completion of fracturing and gas production, and produced water, which occurs during gas production. Collectively referred to as returned frac water (RFW), it is highly saline with varying amounts of organic contamination. It can be disposed of, either by injection into an approved underground injection well, or treated to remove contaminants so that the water meets the requirements of either surface release or recycle use. Depending on the characteristics of the RFW and the availability of satisfactory disposal alternatives, disposal can impose serious costs to the operator. In any case, large quantities of water must be transported to and from well locations, contributing to wear and tear on local roadways that were not designed to handle the heavy loads and increased traffic. The search for a way to mitigate the situation and improve the overall efficiency of shale gas production suggested a treatment method that would allow RFW to be used as make

  14. Newberry Well 55-29 Stimulation Data 2014

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Trenton T. Cladouhos

    The Newberry Volcano EGS Demonstration in central Oregon, a 5 year project begun in 2010, tests recent technological advances designed to reduce the cost of power generated by EGS in a hot, dry well (NWG 55-29) drilled in 2008. First, the stimulation pumps used were designed to run for weeks and deliver large volumes of water at moderate well-head pressure. Second, to stimulate multiple zones, AltaRock developed thermo-degradable zonal isolation materials (TZIMs) to seal off fractures in a geothermal well to stimulate secondary and tertiary fracture zones. The TZIMs degrade within weeks, resulting in an optimized injection/ production profile of the entire well. Third, the project followed a project-specific Induced Seismicity Mitigation Plan (ISMP) to evaluate, monitor for, and mitigate felt induced seismicity. An initial stimulation was conducted in 2012 and continued for 7 weeks, with over 41,000 m3 of water injected. Further analysis indicated a shallow casing leak and an unstable formation in the open hole. The well was repaired with a shallow casing tieback and perforated liner in the open hole and re-stimulated in 2014. The second stimulation started September 23rd, 2014 and continued for 3 weeks with over 9,500 m3 of water injected. The well was treated with several batches of newly tested TZIM diverter materials and a newly designed Diverter Injection Vessel Assembly (DIVA), which was the main modification to the original injection system design used in 2012. A second round of stimulation that included two perforation shots and additional batches of TZIM was conducted on November 11th, 2014 for 9 days with an additional 4,000 m3 of water injected. The stimulations resulted in a 3-4 fold increase in injectivity, and PTS data indicates partial blocking and creation of flow zones near the bottom of the well.

  15. Newberry Well 55-29 Stimulation Data 2014

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Trenton T. Cladouhos

    2015-09-03

    The Newberry Volcano EGS Demonstration in central Oregon, a 5 year project begun in 2010, tests recent technological advances designed to reduce the cost of power generated by EGS in a hot, dry well (NWG 55-29) drilled in 2008. First, the stimulation pumps used were designed to run for weeks and deliver large volumes of water at moderate well-head pressure. Second, to stimulate multiple zones, AltaRock developed thermo-degradable zonal isolation materials (TZIMs) to seal off fractures in a geothermal well to stimulate secondary and tertiary fracture zones. The TZIMs degrade within weeks, resulting in an optimized injection/ production profile of the entire well. Third, the project followed a project-specific Induced Seismicity Mitigation Plan (ISMP) to evaluate, monitor for, and mitigate felt induced seismicity. An initial stimulation was conducted in 2012 and continued for 7 weeks, with over 41,000 m3 of water injected. Further analysis indicated a shallow casing leak and an unstable formation in the open hole. The well was repaired with a shallow casing tieback and perforated liner in the open hole and re-stimulated in 2014. The second stimulation started September 23rd, 2014 and continued for 3 weeks with over 9,500 m3 of water injected. The well was treated with several batches of newly tested TZIM diverter materials and a newly designed Diverter Injection Vessel Assembly (DIVA), which was the main modification to the original injection system design used in 2012. A second round of stimulation that included two perforation shots and additional batches of TZIM was conducted on November 11th, 2014 for 9 days with an additional 4,000 m3 of water injected. The stimulations resulted in a 3-4 fold increase in injectivity, and PTS data indicates partial blocking and creation of flow zones near the bottom of the well.

  16. New guidelines should enhance coiled tubing well control security

    SciTech Connect (OSTI)

    Sas-Jaworsky, A. II

    1997-12-01

    The use of coiled tubing (CT) technology in well servicing operations has expanded dramatically in recent years, becoming a staple of remedial and workover programs. The advantages of CT services are numerous and well defined. As a result, the capabilities of this continuous-length tube technology have been exploited in applications such as high-pressure CT (HPCT), pushing the performance envelope into critical operations. In recent years, the mechanical capability and limitations of CT equipment components have become further defined, enhancing the safe working conditions of the prescribed operations. However, safety in coiled tubing operations is not only the product of equipment design, but of proper planning and identification of potential hazards. The following article highlights safety guidelines related to CT well control stack components as published in API RP 5C7, Recommended Practice for Coiled Tubing Operations in Oil and Gas Well Services (Dec. 1, 1996). API standards are published to facilitate the broad availability of proven engineering and operating practices, and are not intended to obviate the need for applying sound engineering judgment regarding when and where these standards should be utilized. Therefore, these standards should be considered the minimum safety requirements for well service operations, both onshore and offshore. These recommended practice guidelines have been prepared to reflect use by both operators and contract personnel.

  17. Geothermal-Reservoir Well-Stimulation Program. Program status report

    SciTech Connect (OSTI)

    Not Available

    1982-05-01

    Seven experimental fracture stimulation treatments completed to date and the laboratory work performed to develop the stimulation technology are described. A discussion of the pre-stimulation and post-stimulation data and their evaluation is provided for each experiment. Six of the seven stimulation experiments were at least technically successful in stimulating the wells. The two fracture treatments in East Mesa 58-30 more than doubled the producing rate of the previously marginal producer. The two fracture treatments in Raft River and the two in Baca were all successful in obtaining significant production from previously nonproductive intervals. However, these treatments failed to establish commercial production due to deficiencies in either fluid temperature or flow rate. The acid etching treatment in the well at The Geysers did not have any material effect on producing rate.

  18. Current and proposed regulations for salt water disposal wells

    SciTech Connect (OSTI)

    Moody, T.

    1994-09-01

    In recent years, all aspects of hydrocarbon exploration and production (E & P) activities have drawn closer scrutiny in terms of existing and potential impairment of the environment. In addition to drilling, production, and transportation activities, the USEPA has focused on the nature of E & P generated wastes, and the subsequent management of both hazardous and nonhazardous E & P wastes. Approximately 98% of all of the volume of wastes generated by E & P activities is salt water associated with the recovery of hydrocarbons. By far the majority of this waste is disposed of in class II salt water disposal wells. Due to the tremendous volume of salt water generated, the USEPA continues to reevaluate the federal class II salt water injection well program, offering comments, revising its interpretation of existing regulations, and promulgating new regulations. The purpose of the presentation will be to provide a review of existing class II federal regulations, and to provide an overview of potential or newly promulgated regulations.

  19. 2008-08 "Improve Documentation for Monitoring Wells Used for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 "Improve Documentation for Monitoring Wells Used for LANL Environmental Restoration and Clean-up" 2008-08 "Improve Documentation for Monitoring Wells Used for LANL Environmental ...

  20. Flow monitoring and control system for injection wells (Patent...

    Office of Scientific and Technical Information (OSTI)

    Flow monitoring and control system for injection wells Title: Flow monitoring and control system for injection wells The present invention relates to a system for monitoring and ...

  1. Jackson Well Springs Space Heating Low Temperature Geothermal...

    Open Energy Info (EERE)

    Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Jackson Well Springs Space Heating Low Temperature Geothermal Facility Facility Jackson Well...

  2. BLM Fact Sheet- Ormat Technologies Salt Wells Geothermal Energy...

    Open Energy Info (EERE)

    Ormat Technologies Salt Wells Geothermal Energy Project Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: BLM Fact Sheet- Ormat Technologies Salt Wells...

  3. Isotopic Analysis- Fluid At Salt Wells Area (Shevenell & Garside...

    Open Energy Info (EERE)

    At Salt Wells Area (Shevenell & Garside, 2003) Exploration Activity Details Location Salt Wells Geothermal Area Exploration Technique Isotopic Analysis- Fluid Activity Date 2002 -...

  4. Compound and Elemental Analysis At Salt Wells Area (Shevenell...

    Open Energy Info (EERE)

    At Salt Wells Area (Shevenell & Garside, 2003) Exploration Activity Details Location Salt Wells Geothermal Area Exploration Technique Compound and Elemental Analysis Activity Date...

  5. Conceptual Model At Salt Wells Area (Faulds, Et Al., 2011) |...

    Open Energy Info (EERE)

    At Salt Wells Area (Faulds, Et Al., 2011) Exploration Activity Details Location Salt Wells Geothermal Area Exploration Technique Conceptual Model Activity Date 2011 Usefulness...

  6. Buckhorn Mineral Wells Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Buckhorn Mineral Wells Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Buckhorn Mineral Wells Pool & Spa Low Temperature Geothermal Facility...

  7. Pagosa Springs Private Wells Space Heating Low Temperature Geothermal...

    Open Energy Info (EERE)

    Private Wells Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Pagosa Springs Private Wells Space Heating Low Temperature Geothermal Facility...

  8. Mergers and Mass Accretion for Infalling Halos Both End Well...

    Office of Scientific and Technical Information (OSTI)

    End Well Outside Cluster Virial Radii Citation Details In-Document Search Title: Mergers and Mass Accretion for Infalling Halos Both End Well Outside Cluster Virial Radii You ...

  9. Texas Water Code 27A General Provisions for Injection Wells ...

    Open Energy Info (EERE)

    WellsLegal Abstract These rules outline the requirements for construction and maintenance of injection wells in Texas. Published NA Year Signed or Took Effect 1977 Legal...

  10. Marysville Test Well Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Marysville Test Well Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Marysville Test Well Geothermal Area Contents 1 Area Overview 2 History and...

  11. RAPID/Geothermal/Well Field/Oregon | Open Energy Information

    Open Energy Info (EERE)

    pipe, well pad, access road construction, etc). Local Well Field Process not available Policies & Regulations ORS 517 - Mining and Mining Claims ORS 522.135 Permit Time Limit...

  12. RAPID/Geothermal/Well Field/Montana | Open Energy Information

    Open Energy Info (EERE)

    construction will require the MEPA review. Local Well Field Process not available Policies & Regulations MCA 37-43-100 Water Well Contractors References Print PDF...

  13. RAPID/Geothermal/Well Field/Idaho | Open Energy Information

    Open Energy Info (EERE)

    DWR, and file drilling records upon completion. Local Well Field Process not available Policies & Regulations IDAPA 37.03.04.045 - Abandonment of Geothermal Resource Wells IDWS...

  14. Biofuel alternatives to ethanol: pumping the microbial well ...

    Office of Scientific and Technical Information (OSTI)

    Biofuel alternatives to ethanol: pumping the microbial well Citation Details In-Document Search Title: Biofuel alternatives to ethanol: pumping the microbial well Engineered ...

  15. US--Federal Offshore Natural Gas Withdrawals from Oil Wells ...

    U.S. Energy Information Administration (EIA) Indexed Site

    Oil Wells (Million Cubic Feet) US--Federal Offshore Natural Gas Withdrawals from Oil Wells ... Release Date: 06302016 Next Release Date: 07292016 Referring Pages: Offshore Gross ...

  16. US--Federal Offshore Natural Gas Withdrawals from Gas Wells ...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gas Wells (Million Cubic Feet) US--Federal Offshore Natural Gas Withdrawals from Gas Wells ... Release Date: 06302016 Next Release Date: 07292016 Referring Pages: Offshore Gross ...

  17. Improved Design Tools for Surface Water and Standing Column Well...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Improved Design Tools for Surface Water and Standing Column Well Heat Pump Systems Improved Design Tools for Surface Water and Standing Column Well Heat Pump Systems This project ...

  18. RAPID/Geothermal/Well Field/Nevada | Open Energy Information

    Open Energy Info (EERE)

    RAPIDGeothermalWell FieldNevada < RAPID | Geothermal | Well Field Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk...

  19. Geothermal Literature Review At Salt Wells Area (Faulds, Et Al...

    Open Energy Info (EERE)

    Salt Wells Area (Faulds, Et Al., 2011) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geothermal Literature Review At Salt Wells Area (Faulds,...

  20. Masco Home Services/WellHome | Open Energy Information

    Open Energy Info (EERE)

    WellHome Jump to: navigation, search Name: Masco Home ServicesWellHome Place: Taylor, MI Website: www.mascohomeserviceswellhome. References: Masco Home Services...

  1. Development Wells At Raft River Geothermal Area (2004) | Open...

    Open Energy Info (EERE)

    Development Wells At Raft River Geothermal Area (2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Development Wells At Raft River Geothermal...

  2. RAPID/Geothermal/Well Field | Open Energy Information

    Open Energy Info (EERE)

    well, the developer must submit a Sundry Notice to the Nevada Division of Minerals Geothermal Well Field in New Mexico New Mexico Energy, Minerals and Natural Resources...

  3. Magnetotellurics At Salt Wells Area (Bureau of Land Management...

    Open Energy Info (EERE)

    Salt Wells Area (Bureau of Land Management, 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Magnetotellurics At Salt Wells Area (Bureau of...

  4. Single Well Injection Withdrawl Tracer Tests for Proppant Detection -

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Innovation Portal Find More Like This Return to Search Single Well Injection Withdrawl Tracer Tests for Proppant Detection Sandia National Laboratories Contact SNL About This Technology Publications: PDF Document Publication Market Sheet (800 KB) Technology Marketing SummaryA large question preventing optimal natural gas production from "hydrofracked" shales is how far proppants, injected to keep shale fractures open, move into the gas-bearing shales. Knowing precisely

  5. Serviceability of coiled tubing for sour oil and gas wells

    SciTech Connect (OSTI)

    Cayard, M.S.; Kane, R.D.

    1996-08-01

    Coiled tubing is an extremely useful tool in many well logging and workover applications in oil and gas production operations. Several important concerns regarding its use include the need for improved guidelines for the assessment of mechanical integrity, fatigue damage, and the effects of hydrogen sulfide in sour oil and gas production environments. This paper provides information regarding the use of coiled tubing in sour environments with particular emphasis on sulfide stress cracking, hydrogen induced cracking and stress-oriented hydrogen induced cracking and how they work synergistically with cyclic cold working of the steel tubing.

  6. Recomplete deep hot wells successfully with coiled tubing

    SciTech Connect (OSTI)

    Garner, T.; Fleckenstein, W.; Shelley, B.

    1995-06-01

    A squeeze reperforation procedure in the Elk Hills, California field using coiled tubing included contaminating excess cement and jetting it from the well bore to eliminate the need to drill out cement before shooting new perforations. The 324-7R well was producing 260 b/d of oil through 2 7/8-in. production tubing, with a 20,000-scf/bbl gas-oil ratio (GOR). Bottomhole static temperature was 250 F. After pumping a cement squeeze to 9,000 ft trough 1{1/2}-in. coiled tubing (CT) run inside the production tubing, oil production increased to 550 b/d of oil, and the GOR decreased to 5,000 scf/bbl when new perforations were shot. Cement was pumped 9,000 ft through the CT and circulated back through the production tubing/CT annulus. Operation cost was estimated at 20% less than for a comparable job performance with conventional tubing. Cost of the CT squeeze was recovered by 58 days incremental production.

  7. Testing geopressured geothermal reservoirs in existing wells: Detailed completion prognosis for geopressured-geothermal well of opportunity, prospect #2

    SciTech Connect (OSTI)

    1981-03-01

    A geopressured-geothermal test of Martin Exploration Company's Crown Zellerbach Well No. 2 will be conducted in the Tuscaloosa Trend. The Crown Zellerbach Well No. 1 will be converted to a saltwater disposal well for disposal of produced brine. The well is located in the Satsuma Area, Livingston parish, Louisiana. Eaton proposes to test the Tuscaloosa by perforating the 7 inch casing from 16,718 feet to 16,754 feet. The reservoir pressure at an intermediate formation depth of 16,736 feet is anticipated to be 12,010 psi and the temperature is anticipated to be 297 F. Calculated water salinity is 16,000 ppm. The well is expected to produce a maximum of 16,000 barrels of water a day with a gas content of 51 SCF/bbl. Eaton will re-enter the test well, clean out to 17,000 feet, run production casing and complete the well. The disposal well will be re-entered and completed in the 9-5/8 inch casing for disposal of produced brine. Testing will be conducted similar to previous Eaton annular flow WOO tests. An optional test from 16,462 feet to 16,490 feet may be performed after the original test and will require a workover with a rig on location to perform the plugback. The surface production equipment utilized on previous tests will be utilized on this test. The equipment has worked satisfactorily and all parties involved in the testing are familiar with its operation. Weatherly Engineering will operate the test equipment. The Institute of Gas Technology (IGT) and Mr. Don Clark will handle sampling, testing and reservoir engineering evaluation, respectively. wireline work required will be awarded on basis of bid evaluation. At the conclusion of the test period, the D.O.E. owned test equipment will be removed from the test site, the test and disposal wells plugged and abandoned and the sites restored to the satisfaction of all parties.

  8. Flow tests of the Gladys McCall well

    SciTech Connect (OSTI)

    Randolph, P.L.; Hayden, C.G.; Rogers, L.A. )

    1992-04-01

    This report pulls together the data from all of the geopressured-geothermal field research conducted at the Gladys McCall well. The well produced geopressured brine containing dissolved natural gas from the Lower Miocene sands at a depth of 15,150 to 16,650 feet. More than 25 million barrels of brine and 727 million standard cubic feet of natural gas were produced in a series of flow tests between December 1982 and October 1987 at various brine flow rates up to 28,000 barrels per day. Initial short-term flow tests for the Number 9 Sand found the permeability to be 67 to 85 md (millidarcies) for a brine volume of 85 to 170 million barrels. Initial short-term flow tests for the Number 8 Sand found a permeability of 113 to 132 md for a reservoir volume of 430 to 550 million barrels of brine. The long-term flow and buildup test of the Number 8 Sand found that the high-permeability reservoir connected to the wellbore (measured by the short-term flow test) was connected to a much larger, low-permeability reservoir. Numerical simulation of the flow and buildup tests required this large connected reservoir to have a volume of about 8 billion barrels (two cubic miles of reservoir rock) with effective permeabilities in the range of 0.2 to 20 md. Calcium carbonate scale formation in the well tubing and separator equipment was a problem. During the first 2 years of production, scale formation was prevented in the surface equipment by injection of an inhibitor upstream of the choke. Starting in 1985, scale formation in the production tubing was successfully prevented by injecting inhibitor pills'' directly into the reservoir. Corrosion and/or erosion of surface piping and equipment, as well as disposal well tubing, was also significant.

  9. Well completion process for formations with unconsolidated sands

    DOE Patents [OSTI]

    Davies, David K.; Mondragon, III, Julius J.; Hara, Philip Scott

    2003-04-29

    A method for consolidating sand around a well, involving injecting hot water or steam through well casing perforations in to create a cement-like area around the perforation of sufficient rigidity to prevent sand from flowing into and obstructing the well. The cement area has several wormholes that provide fluid passageways between the well and the formation, while still inhibiting sand inflow.

  10. TWRS privatization phase 1 monitoring wells engineering study

    SciTech Connect (OSTI)

    Williams, B.A.; Newcomer, D.R.

    1998-04-01

    This engineering study provides an evaluation of existing wells and boreholes (wells) within the proposed location for the Tank Waste Remediation System (TWRS) Privatization Phase 1 demonstration site. Phase 1 is part of the TWRS program that was established to manage, retrieve, treat, immobilize, and dispose of high-level waste stored in underground tanks at the Hanford Site. This evaluation is to determine which wells will remain active within the demonstration site based on regulatory, programmatic, or other beneficial use requirements. An initial evaluation of wells within the demonstration site was conducted in 1996. However, changes in construction plans and expansion of the demonstration site necessitated a reevaluation and reclassification of the wells that are within the expanded site. Impacted wells include many of those previously evaluated as well as additional wells identified in or near the expansion areas. Thirty-three wells exist within and immediately adjacent to the identified boundary of the proposed demonstration site. The wells identified for decommissioning will be abandoned according to the well decommissioning plan. Future well requirements within the site include replacement wells for those wells impacted by construction activities, replacements for Resource Conservation and Recovery Act of 1976 (RCRA) wells going dry, and a new characterization well installed to support a TWRS Phase 2 site assessment.

  11. U.S. Average Depth of Crude Oil Developmental Wells Drilled (Feet per Well)

    Gasoline and Diesel Fuel Update (EIA)

    Estimated Production from Reserves (Billion Cubic Feet) Estimated Production from Reserves (Billion Cubic Feet) U.S. Associated-Dissolved Natural Gas, Wet After Lease Separation, Estimated Production from Reserves (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1970's 3,405 1980's 3,405 3,316 3,248 3,355 3,518 3,454 3,443 3,351 3,192 3,099 1990's 2,936 2,968 3,031 2,868 2,907 2,886 2,938 3,022 3,136 3,313 2000's 3,299 3,193 2,988 2,855 2,742

  12. Optimum position for wells producing at constant wellbore pressure

    SciTech Connect (OSTI)

    Camacho-Velazquez, R.; Rodriguez de la Garza, F.; Galindo-Nava, A.; Prats, M.

    1994-12-31

    This paper deals with the determination of the optimum position of several wells, producing at constant different wellbore pressures from a two-dimensional closed-boundary reservoirs, to maximize the cumulative production or the total flow rate. To achieve this objective they authors use an improved version of the analytical solution recently proposed by Rodriguez and Cinco-Ley and an optimization algorithm based on a quasi-Newton procedure with line search. At each iteration the algorithm approximates the negative of the objective function by a cuadratic relation derived from a Taylor series. The improvement of rodriguez and Cinco`s solution is attained in four ways. First, an approximation is obtained, which works better at earlier times (before the boundary dominated period starts) than the previous solution. Second, the infinite sums that are present in the solution are expressed in a condensed form, which is relevant for reducing the computer time when the optimization algorithm is used. Third, the solution is modified to take into account the possibility of having wells starting to produce at different times. This point allows them to deal with the problem of getting the optimum position for an infill drilling program. Last, the solution is extended to include the possibility of changing the value of wellbore pressure or being able to stimulate any of the wells at any time. When the wells are producing at different wellbore pressures it is found that the optimum position is a function of time, otherwise the optimum position is fixed.

  13. Horizontal underbalanced drilling of gas wells with coiled tubing

    SciTech Connect (OSTI)

    Cox, R.J.; Li, J.; Lupick, G.S.

    1999-03-01

    Coiled tubing drilling technology is gaining popularity and momentum as a significant and reliable method of drilling horizontal underbalanced wells. It is quickly moving into new frontiers. To this point, most efforts in the Western Canadian Basin have been focused towards sweet oil reservoirs in the 900--1300 m true vertical depth (TVD) range, however there is an ever-increasing interest in deeper and gas-producing formations. Significant design challenges on both conventional and coiled tubing drilling operations are imposed when attempting to drill these formations underbalanced. Coiled tubing is an ideal technology for underbalanced drilling due to its absence of drillstring connections resulting in continuous underbalanced capabilities. This also makes it suitable for sour well drilling and live well intervention without the risk of surface releases of reservoir gas. Through the use of pressure deployment procedures it is possible to complete the drilling operation without need to kill the well, thereby maintaining underbalanced conditions right through to the production phase. The use of coiled tubing also provides a means for continuous wireline communication with downhole steering, logging and pressure recording devices.

  14. Method and apparatus for deep underwater well drilling and completion

    SciTech Connect (OSTI)

    Lawson, J.E.

    1984-01-24

    A method and apparatus are disclosed for remotely establishing an underwater well under conditions of great water depth including a drilling guide structure located on the floor of the body of water; a single handling and guiding string extending upwardly from the drilling guide structure and maintained in tension by an elongated buoy; a series of drilling guide arm units, flowline guide arm units and wellhead guide arm units to be lowered down the string, oriented relative to desired well positions and then retrieved once the wells have been drilled and the wellheads and flowlines secured in place; and a production gathering assembly to be lowered down the string, oriented relative to the wellheads and flowlines, and then coupled to these wellheads and flowlines. The orientation is accomplished between an orientation member on the outer surface of a tubular member extending upwardly from the guide structure and orientation members on the inner surfaces of open-ended members in the drilling guide arm units, flowline guide arm units, wellhead guide arm units and the production gathering assembly.

  15. Produce through coiled tubing to keep marginal wells unloaded

    SciTech Connect (OSTI)

    Not Available

    1986-12-01

    The use of coiled tubing as an alternate production tubing string has been attempted or considered by numerous operators in the past. However, its use has been tempered due to several problems known to be inherent with coiled tubing recompletions. Some of the problems encountered are: Killing the well to allow for tubing installation always carries the risk of formation damage; Candidate wells normally are marginal producers and may not produce sufficient revenue to justify the cost of a major workover; Procedures followed to install surface equipment may be hazardous; Previous installation designs required running the coiled tubing to the top of the tree, affecting the functional loss of all existing wellhead equipment; Often substandard modifications were required to reconnect into existing production facilities. However, a prototype spool and tubing hanger that incorporated modifications designed to solve these problems has been developed jointly by Reeled Tubing, Inc., and Well-head Control Systems. The solution is a new concept in the coiled tubing hanger. The design incorporates a floating element, which is a combination slip bowl, seal element and retaining sub. The entire assembly is installed and activated in the bore of a specially designed spool installed between the primary and secondary master valves of the existing wellhead.

  16. Enhanced Geothermal Systems (EGS) well construction technology evaluation report.

    SciTech Connect (OSTI)

    Capuano, Louis, Jr.; Huh, Michael; Swanson, Robert; Raymond, David Wayne; Finger, John Travis; Mansure, Arthur James; Polsky, Yarom; Knudsen, Steven Dell

    2008-12-01

    Electricity production from geothermal resources is currently based on the exploitation of hydrothermal reservoirs. Hydrothermal reservoirs possess three ingredients critical to present day commercial extraction of subsurface heat: high temperature, in-situ fluid and high permeability. Relative to the total subsurface heat resource available, hydrothermal resources are geographically and quantitatively limited. A 2006 DOE sponsored study led by MIT entitled 'The Future of Geothermal Energy' estimates the thermal resource underlying the United States at depths between 3 km and 10 km to be on the order of 14 million EJ. For comparison purposes, total U.S. energy consumption in 2005 was 100 EJ. The overwhelming majority of this resource is present in geological formations which lack either in-situ fluid, permeability or both. Economical extraction of the heat in non-hydrothermal situations is termed Enhanced or Engineered Geothermal Systems (EGS). The technologies and processes required for EGS are currently in a developmental stage. Accessing the vast thermal resource between 3 km and 10 km in particular requires a significant extension of current hydrothermal practice, where wells rarely reach 3 km in depth. This report provides an assessment of well construction technology for EGS with two primary objectives: (1) Determining the ability of existing technologies to develop EGS wells. (2) Identifying critical well construction research lines and development technologies that are likely to enhance prospects for EGS viability and improve overall economics. Towards these ends, a methodology is followed in which a case study is developed to systematically and quantitatively evaluate EGS well construction technology needs. A baseline EGS well specification is first formulated. The steps, tasks and tools involved in the construction of this prospective baseline EGS well are then explicitly defined by a geothermal drilling contractor in terms of sequence, time and cost. A

  17. Apparatus and method for sealing perforated well casing

    DOE Patents [OSTI]

    Blount, C.G.; Benham, R.A.; Brock, J.L.; Emerson, J.A.; Ferguson, K.R.; Scheve, D.F.; Schmidt, J.H.; Schuler, K.W.; Stanton, P.L.

    1997-03-25

    Perforations and other openings in well casings, liners and other conduits may be substantially blocked or sealed to prevent fluid flow between the casing or liner interior and an earth formation by placing a radially expansible sleeve adjacent the perforations or openings and urging the sleeve into forcible engagement with the casing or inner wall using an explosive charge. An apparatus including a radially contracted sleeve formed by a coiled plate member or a tubular member having flutes defined by external and internal folds, may be deployed into a well casing or liner through a production or injection tubing string and on the end of a flexible cable or coilable tubing. An explosive charge disposed on the apparatus and within the sleeve may be detonated to urge the sleeve into forcible engagement with the casing inner wall. 17 figs.

  18. Apparatus and method for sealing perforated well casing

    DOE Patents [OSTI]

    Blount, Curtis G.; Benham, Robert A.; Brock, Jerry L.; Emerson, John A.; Ferguson, Keith R.; Scheve, Donald F.; Schmidt, Joseph H.; Schuler, Karl W.; Stanton, Philip L.

    1997-01-01

    Perforations and other openings in well casings, liners and other conduits may be substantially blocked or sealed to prevent fluid flow between the casing or liner interior and an earth formation by placing a radially expansible sleeve adjacent the perforations or openings and urging the sleeve into forcible engagement with the casing or inner wall using an explosive charge. An apparatus including a radially contracted sleeve formed by a coiled plate member or a tubular member having flutes defined by external and internal folds, may be deployed into a well casing or liner through a production or injection tubing string and on the end of a flexible cable or coilable tubing. An explosive charge disposed on the apparatus and within the sleeve may be detonated to urge the sleeve into forcible engagement with the casing inner wall.

  19. Evaluation of existing wells at the Nevada Test Site for plugging and abandonment or for recompletion as monitoring wells

    SciTech Connect (OSTI)

    Gillespie, D.; Donithan, D.; Seaber, P.

    1996-09-01

    In this investigation, various information sources from the Nevada Test Site (NTS), national laboratories and the Desert Research Institute were utilized to verify the existence of approximately 250 existing wells or boreholes at the NTS. Of these wells, 40 were determined to be located within one kilometer of underground nuclear tests conducted near (within 25 m) or below the water table. These 40 existing wells were then investigated in detail to determine their drilling and construction history, lithology and hydrologic units penetrated, and current conditions. These findings are presented for each well, as well as recommendations as to whether individual wells should be plugged and abandoned or could possibly be recompleted as groundwater quality monitoring locations. Two of the 40 wells, UE-20e and UE-2a, contain lost drilling strings and do not penetrate aquifers. These two wells should be plugged and abandoned and removed from the NTS well inventory. Three other wells, TestWell No. 1, TestWell No. 5, and TestWell No. 6, are reported stemmed with sand to the surface. These three wells did not penetrate the water table and would require substantial deepening to be recompleted as groundwater monitoring locations. If not recompleted, these wells should also be plugged and abandoned and removed from the NTS well inventory. Eleven of the 34 wells, Test Well No. 7, RNM No. 1, RNM No. 2, RNM No. 2S, U-3cn No. 5, UE-20n No. 1, UE-7ns, UE-5n, UE-4t, UE-3e No. 3 and U-15k Test Hole, penetrate aquifers and do not require recompletion to produce groundwater monitoring locations. These wells are either constructed such that recompletion is not needed or not possible. Several of the 11 wells may require the removal of tubing and the placement or replacement of pump equipment. All five of the wells require wellhead rehabilitation to ensure they are not contaminated by surface water or other materials.

  20. Use of bauxite as packing material in steam injection wells

    SciTech Connect (OSTI)

    Scoglio, J.; Joubert, G.; Gallardo, B.

    1995-12-31

    Cyclic steam injection, also known as steam soak, has proven to be the most efficient method for producing heavy crude oil and bitumen from unconsolidated sands. The application of steam injection may, however, generate sand production, causing, among other things, a decrease in production. The gravel pack technique is the most efficient way to prevent fines production from cold producing wells. But, once they are steam stimulated, a dissolution of quartz containing gravel material takes place reducing greatly the packing permeability and eventually sand production. Different types of packing material have been used to avoid sand production after cyclic steam injection, such as gravel, ceramics, bauxite, coated resin, and American sand. This paper presents the results of field test, using sinterized bauxite as a packing material, carried out in Venezuela`s heavy oil operations as a part of a comprehensive program aimed at increasing the packing durability and reducing sand production. This paper also verify the results of laboratory tests in which Bauxite was found to be less soluble than other packing material when steam injected.

  1. Testing geopressured geothermal reservoirs in existing wells. Wells of Opportunity Program final contract report, 1980-1981

    SciTech Connect (OSTI)

    Not Available

    1982-01-01

    The geopressured-geothermal candidates for the Wells of Opportunity program were located by the screening of published information on oil industry activity and through direct contact with the oil and gas operators. This process resulted in the recommendation to the DOE of 33 candidate wells for the program. Seven of the 33 recommended wells were accepted for testing. Of these seven wells, six were actually tested. The first well, the No. 1 Kennedy, was acquired but not tested. The seventh well, the No. 1 Godchaux, was abandoned due to mechanical problems during re-entry. The well search activities, which culminated in the acceptance by the DOE of 7 recommended wells, were substantial. A total of 90,270 well reports were reviewed, leading to 1990 wells selected for thorough geological analysis. All of the reservoirs tested in this program have been restricted by one or more faults or permeability barriers. A comprehensive discussion of test results is presented.

  2. Multi-well sample plate cover penetration system

    DOE Patents [OSTI]

    Beer, Neil Reginald

    2011-12-27

    An apparatus for penetrating a cover over a multi-well sample plate containing at least one individual sample well includes a cutting head, a cutter extending from the cutting head, and a robot. The cutting head is connected to the robot wherein the robot moves the cutting head and cutter so that the cutter penetrates the cover over the multi-well sample plate providing access to the individual sample well. When the cutting head is moved downward the foil is pierced by the cutter that splits, opens, and folds the foil inward toward the well. The well is then open for sample aspiration but has been protected from cross contamination.

  3. Other States Natural Gas Gross Withdrawals from Gas Wells (Million...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gas Wells (Million Cubic Feet) Other States Natural Gas Gross Withdrawals from Gas Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 72,328 ...

  4. Indiana Natural Gas Withdrawals from Oil Wells (Million Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Withdrawals from Oil Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep ... Referring Pages: Natural Gas Gross Withdrawals from Oil Wells Indiana Natural Gas Gross ...

  5. Indiana Natural Gas Withdrawals from Oil Wells (Million Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Oil Wells (Million Cubic Feet) Indiana Natural Gas Withdrawals from Oil Wells (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 ...

  6. Missouri Natural Gas Gross Withdrawals from Oil Wells (Million...

    U.S. Energy Information Administration (EIA) Indexed Site

    Oil Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 0 ... Referring Pages: Natural Gas Gross Withdrawals from Oil Wells Missouri Natural Gas Gross ...

  7. Other States Natural Gas Gross Withdrawals from Coalbed Wells...

    U.S. Energy Information Administration (EIA) Indexed Site

    Coalbed Wells (Million Cubic Feet) Other States Natural Gas Gross Withdrawals from Coalbed Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2002 0 0 ...

  8. Other States Natural Gas Gross Withdrawals from Oil Wells (Million...

    U.S. Energy Information Administration (EIA) Indexed Site

    Oil Wells (Million Cubic Feet) Other States Natural Gas Gross Withdrawals from Oil Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 3,459 3,117 ...

  9. Missouri Natural Gas Gross Withdrawals from Oil Wells (Million...

    U.S. Energy Information Administration (EIA) Indexed Site

    from Oil Wells (Million Cubic Feet) Missouri Natural Gas Gross Withdrawals from Oil Wells (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 ...

  10. Property:NumRepWells | Open Energy Information

    Open Energy Info (EERE)

    NumRepWells Property Type Number Description Number of replacement wells needed in a specific Geothermal Resource Area Retrieved from "http:en.openei.orgwindex.php?titlePrope...

  11. Success of Geothermal Wells: A Global Study | Open Energy Information

    Open Energy Info (EERE)

    of Geothermal Wells: A Global Study Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Success of Geothermal Wells: A Global Study Abstract This report...

  12. BLM Fact Sheet- Vulcan Power Company Salt Wells Geothermal Energy...

    Open Energy Info (EERE)

    Vulcan Power Company Salt Wells Geothermal Energy Project Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: BLM Fact Sheet- Vulcan Power Company Salt Wells...

  13. NRS Chapter 534 - Underground Water and Wells | Open Energy Informatio...

    Open Energy Info (EERE)

    - Underground Water and Wells Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: NRS Chapter 534 - Underground Water and WellsLegal...

  14. Virginia Natural Gas Number of Gas and Gas Condensate Wells ...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gas and Gas Condensate Wells (Number of Elements) Virginia Natural Gas Number of Gas and Gas Condensate Wells (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 ...

  15. Spin-orbit interaction in multiple quantum wells

    SciTech Connect (OSTI)

    Hao, Ya-Fei

    2015-01-07

    In this paper, we investigate how the structure of multiple quantum wells affects spin-orbit interactions. To increase the interface-related Rashba spin splitting and the strength of the interface-related Rashba spin-orbit interaction, we designed three kinds of multiple quantum wells. We demonstrate that the structure of the multiple quantum wells strongly affected the interface-related Rashba spin-orbit interaction, increasing the interface-related Rashba spin splitting to up to 26% larger in multiple quantum wells than in a stepped quantum well. We also show that the cubic Dresselhaus spin-orbit interaction similarly influenced the spin relaxation time of multiple quantum wells and that of a stepped quantum well. The increase in the interface-related Rashba spin splitting originates from the relationship between interface-related Rashba spin splitting and electron probability density. Our results suggest that multiple quantum wells can be good candidates for spintronic devices.

  16. Montana Board of Water Well Contractors Webpage | Open Energy...

    Open Energy Info (EERE)

    Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Montana Board of Water Well Contractors Webpage Abstract Provides information on water well...

  17. File:HI well abandonment.pdf | Open Energy Information

    Open Energy Info (EERE)

    HI well abandonment.pdf Jump to: navigation, search File File history File usage File:HI well abandonment.pdf Size of this preview: 364 600 pixels. Full resolution (1,275 ...

  18. Kentucky Natural Gas Withdrawals from Gas Wells (Million Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gas Wells (Million Cubic Feet) Kentucky Natural Gas Withdrawals from Gas Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 7,021 6,303 6,870 ...

  19. Missouri Natural Gas Withdrawals from Gas Wells (Million Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Withdrawals from Gas Wells (Million Cubic Feet) Missouri Natural Gas Withdrawals from Gas Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 0 0 1 ...

  20. Ohio Natural Gas Withdrawals from Gas Wells (Million Cubic Feet...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gas Wells (Million Cubic Feet) Ohio Natural Gas Withdrawals from Gas Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 13,138 11,794 12,855 ...

  1. Montana Natural Gas Gross Withdrawals from Gas Wells (Million...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gas Wells (Million Cubic Feet) Montana Natural Gas Gross Withdrawals from Gas Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 4,561 3,826 4,106 ...

  2. Utah Natural Gas Gross Withdrawals from Gas Wells (Million Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gas Wells (Million Cubic Feet) Utah Natural Gas Gross Withdrawals from Gas Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 21,638 18,808 21,037 ...

  3. Louisiana Natural Gas Gross Withdrawals from Gas Wells (Million...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gas Wells (Million Cubic Feet) Louisiana Natural Gas Gross Withdrawals from Gas Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 425,704 369,500 ...

  4. Florida Natural Gas Gross Withdrawals from Gas Wells (Million...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gas Wells (Million Cubic Feet) Florida Natural Gas Gross Withdrawals from Gas Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1996 - - - - - - - - - ...

  5. Indiana Natural Gas Withdrawals from Gas Wells (Million Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Withdrawals from Gas Wells (Million Cubic Feet) Indiana Natural Gas Withdrawals from Gas Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 21 18 ...

  6. Michigan Natural Gas Gross Withdrawals from Gas Wells (Million...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gas Wells (Million Cubic Feet) Michigan Natural Gas Gross Withdrawals from Gas Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 9,579 8,593 ...

  7. Tennessee Natural Gas Withdrawals from Gas Wells (Million Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gas Wells (Million Cubic Feet) Tennessee Natural Gas Withdrawals from Gas Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 0 0 0 0 0 0 0 0 0 0 0 ...

  8. Virginia Natural Gas Withdrawals from Gas Wells (Million Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Withdrawals from Gas Wells (Million Cubic Feet) Virginia Natural Gas Withdrawals from Gas Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 1,849 ...

  9. Maryland Natural Gas Withdrawals from Gas Wells (Million Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Withdrawals from Gas Wells (Million Cubic Feet) Maryland Natural Gas Withdrawals from Gas Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 0 0 5 ...

  10. Oregon Natural Gas Gross Withdrawals from Gas Wells (Million...

    U.S. Energy Information Administration (EIA) Indexed Site

    from Gas Wells (Million Cubic Feet) Oregon Natural Gas Gross Withdrawals from Gas Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 246 244 232 ...

  11. Mississippi Natural Gas Gross Withdrawals from Gas Wells (Million...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gas Wells (Million Cubic Feet) Mississippi Natural Gas Gross Withdrawals from Gas Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 14,797 13,076 ...

  12. Wyoming Natural Gas Gross Withdrawals from Gas Wells (Million...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gas Wells (Million Cubic Feet) Wyoming Natural Gas Gross Withdrawals from Gas Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 58,111 51,244 ...

  13. Colorado Natural Gas Gross Withdrawals from Gas Wells (Million...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gas Wells (Million Cubic Feet) Colorado Natural Gas Gross Withdrawals from Gas Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 15,390 18,697 ...

  14. Nebraska Natural Gas Withdrawals from Gas Wells (Million Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gas Wells (Million Cubic Feet) Nebraska Natural Gas Withdrawals from Gas Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 9 10 11 6 9 8 10 9 8 ...

  15. RAPID/Geothermal/Well Field/Colorado | Open Energy Information

    Open Energy Info (EERE)

    standards set forth in 2 CCR 402-10:8 and 10:9). Local Well Field Process not available Policies & Regulations 2 CCR 402-10 - Rules and Regulations for Geothermal Well Permitting...

  16. File:05AKADrillingWellDevelopment.pdf | Open Energy Information

    Open Energy Info (EERE)

    AKADrillingWellDevelopment.pdf Jump to: navigation, search File File history File usage Metadata File:05AKADrillingWellDevelopment.pdf Size of this preview: 463 599 pixels....

  17. File:05IDADrillingWellDevelopment.pdf | Open Energy Information

    Open Energy Info (EERE)

    5IDADrillingWellDevelopment.pdf Jump to: navigation, search File File history File usage Metadata File:05IDADrillingWellDevelopment.pdf Size of this preview: 463 599 pixels....

  18. File:05NVADrillingWellDevelopment.pdf | Open Energy Information

    Open Energy Info (EERE)

    05NVADrillingWellDevelopment.pdf Jump to: navigation, search File File history File usage Metadata File:05NVADrillingWellDevelopment.pdf Size of this preview: 463 599 pixels....

  19. Illinois Natural Gas Withdrawals from Oil Wells (Million Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Oil Wells (Million Cubic Feet) Illinois Natural Gas Withdrawals from Oil Wells (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1991 1 1 1 1 1 1 2 1 1 1 1...

  20. Trip report for field visit to Fayetteville Shale gas wells.

    SciTech Connect (OSTI)

    Veil, J. A.; Environmental Science Division

    2007-09-30

    This report describes a visit to several gas well sites in the Fayetteville Shale on August 9, 2007. I met with George Sheffer, Desoto Field Manager for SEECO, Inc. (a large gas producer in Arkansas). We talked in his Conway, Arkansas, office for an hour and a half about the processes and technologies that SEECO uses. We then drove into the field to some of SEECO's properties to see first-hand what the well sites looked like. In 2006, the U.S. Department of Energy's (DOE's) National Energy Technology Laboratory (NETL) made several funding awards under a program called Low Impact Natural Gas and Oil (LINGO). One of the projects that received an award is 'Probabilistic Risk-Based Decision Support for Oil and Gas Exploration and Production Facilities in Sensitive Ecosystems'. The University of Arkansas at Fayetteville has the lead on the project, and Argonne National Laboratory is a partner. The goal of the project is to develop a Web-based decision support tool that will be used by mid- and small-sized oil and gas companies as well as environmental regulators and other stakeholders to proactively minimize adverse ecosystem impacts associated with the recovery of gas reserves in sensitive areas. The project focuses on a large new natural gas field called the Fayetteville Shale. Part of the project involves learning how the natural gas operators do business in the area and the technologies they employ. The field trip on August 9 provided an opportunity to do that.

  1. Characterization and modeling of multiphase mixtures from deep, subsea wells

    SciTech Connect (OSTI)

    Song, S.; Hill, A.D.

    1996-09-01

    The effects of flow in a vertical pipe on the flow in subsequent horizontal pipes were investigated by performing both experimental and theoretical studies. This geometry mimics production from subsea wells connected to subsea horizontal flow lines. The fluids were conducted into a 153-meter deep well through two different casings, allowing the mixtures to flow up through a 5.08 cm ID vertical pipe and then into a horizontal flow loop which consists of two pipes with 6.35 cm ID and 18.4 cm ID, respectively. The flow regime behaviors in the horizontal pipes were studied for a wide range of flow rates. From the tests, it was found that the flow regimes in the small horizontal pipe were greatly affected by the flows in the vertical pipe while the flow regimes in the large horizontal pipe were hardly affected. A theoretical model based on wave mechanics was developed to simulate the process of the liquid slugs formed in the vertical pipe being carried over into the horizontal pipe. The theoretical predictions matched the experimental observations very well. The results of this study will greatly benefit the understanding of the flow regime behavior that will occur in deep, subsea flow lines transporting multiple phases from subsea completions.

  2. Well Monitoring Systems for EGS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Well Monitoring Systems for EGS Well Monitoring Systems for EGS Well Monitoring Systems for EGS presentation at the April 2013 peer review meeting held in Denver, Colorado. ht_tools_peer2013.pdf (638.31 KB) More Documents & Publications Well Monitoring System for EGS track 3: enhanced geothermal systems (EGS) | geothermal 2015 peer review 300ÂșC DDS + 300ÂșC MWD

  3. New Wells Provide Information on Groundwater at Pahute Mesa

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 28, 2012 New Wells Provide Information on Groundwater at Pahute Mesa New wells drilled near historic underground test areas in Nevada are helping scientists get a clearer understanding of the groundwater in these areas while contributing to the design of a long-term monitoring system. Drilled from September to October 2012, these two wells will supplement a network of more than 20 existing characterization wells in an area called Pahute Mesa, which extends from the northwestern portion

  4. Multifunctional Corrosion-resistant Foamed Well Cement Composites

    Broader source: Energy.gov [DOE]

    Multifunctional Corrosion-resistant Foamed Well Cement Composites presentation at the April 2013 peer review meeting held in Denver, Colorado.

  5. Exploratory Well At Raft River Geothermal Area (1977) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Exploratory Well At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  6. Exploratory Well At Raft River Geothermal Area (1975) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Exploratory Well At Raft River Geothermal Area (1975) Exploration Activity Details Location Raft River...

  7. Basic Data Report for Monitor Well AEC-7 Reconfiguration

    SciTech Connect (OSTI)

    Washington Regulatory and Environmental Services

    2005-01-20

    The New Mexico Office of the State Engineer (OSE) permitted well AEC-7 as C-2742. This well has been part of the far-field monitoring network since 1974. The well was used to obtain water level elevations and hydraulic parameters from both the Bell Canyon Formation and the Culebra Member of the Rustler Formation. This basic data report provides a historical account of the well from the original installation to the current configuration.

  8. Development of an Improved Cement for Geothermal Wells

    Broader source: Energy.gov [DOE]

    Development of an Improved Cement for Geothermal Wells presentation at the April 2013 peer review meeting held in Denver, Colorado.

  9. Enhanced Geothermal Systems (EGS) Well Construction Technology Evaluation Report

    SciTech Connect (OSTI)

    Polsky, Yarom; Capuano, Louis; Finger, John; Huh, Michael; Knudsen, Steve; Chip, A.J. Mansure; Raymond, David; Swanson, Robert

    2008-12-01

    This report provides an assessment of well construction technology for EGS with two primary objectives: 1. Determining the ability of existing technologies to develop EGS wells. 2. Identifying critical well construction research lines and development technologies that are likely to enhance prospects for EGS viability and improve overall economics.

  10. Soda Lake Well Lithology Data and Geologic Cross-Sections

    SciTech Connect (OSTI)

    Faulds, James E.

    2013-12-31

    Comprehensive catalogue of drill‐hole data in spreadsheet, shapefile, and Geosoft database formats. Includes XYZ locations of well heads, year drilled, type of well, operator, total depths, well path data (deviations), lithology logs, and temperature data. Plus, 13 cross‐sections in Adobe Illustrator format.

  11. Well Logging Security Initiatives | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Well Logging Security ... Well Logging Security Initiatives The mp4 video format is not supported by this browser. Download video Captions: On Watch as GTRI demonstrates the threat to the security of (oil) well logging systems and outlines the initiatives that are enhancing the security of these sources worldwide

  12. Solar heat gain through a skylight in a light well

    SciTech Connect (OSTI)

    Klems, J.H.

    2001-08-01

    Detailed heat flow measurements on a skylight mounted on a light well of significant depth are presented. It is shown that during the day much of the solar energy that strikes the walls of the well does not reach the space below. Instead, this energy is trapped in the stratified air of the light well and eventually either conducted through the walls of the well or back out through the skylight. The standard model for predicting fenestration heat transfer does not agree with the measurements when it is applied to the skylight/well combination as a whole (the usual practice), but does agree reasonably well when it is applied to the skylight alone, using the well air temperature near the skylight. A more detailed model gives good agreement. Design implications and future research directions are discussed.

  13. Well fluid isolation and sample apparatus and method

    DOE Patents [OSTI]

    Schalla, Ronald; Smith, Ronald M.; Hall, Stephen H.; Smart, John E.

    1995-01-01

    The present invention specifically permits purging and/or sampling of a well but only removing, at most, about 25% of the fluid volume compared to conventional methods and, at a minimum, removing none of the fluid volume from the well. The invention is an isolation assembly that is inserted into the well. The isolation assembly is designed so that only a volume of fluid between the outside diameter of the isolation assembly and the inside diameter of the well over a fluid column height from the bottom of the well to the top of the active portion (lower annulus) is removed. A seal may be positioned above the active portion thereby sealing the well and preventing any mixing or contamination of inlet fluid with fluid above the packer. Purged well fluid is stored in a riser above the packer. Ports in the wall of the isolation assembly permit purging and sampling of the lower annulus along the height of the active portion.

  14. Field project to obtain pressure core, wireline log, and production test data for evaluation of CO/sub 2/ flooding potential. Texas Pacific Bennett Ranch Unit well No. 310, Wasson (San Andres) Field, Yoakum County, Texas

    SciTech Connect (OSTI)

    Swift, T.E.; Goodrich, J.H.; Kumar, R.M.; McCoy, R.L.; Wilhelm, M.H.; Glascock, M.R.

    1982-01-01

    The coring, logging and testing of Bennett Ranch Unit well No. 310 was a cooperative effort between Texas Pacific, owner of the well, and Gruy Federal, Inc. The requirements of the contract, which are summarized in Enclosure 1, Appendix A, include drilling and coring activities. The pressure-coring and associated logging and testing programs in selected wells are intended to provide data on in-situ oil saturation, porosity and permeability distribution, and other data needed for resource characterization of fields and reservoirs in which CO/sub 2/ injection might have a high probability of success. This report presents detailed information on the first such project. This project demonstrates the usefulness of integrating pressure core, log and production data to realistically evaluate a reservoir for carbon dioxide flood. The engineering of tests and analysis of such experimental data requires original thinking, but the reliability of the results is higher than data derived from conventional tests.

  15. Nitrogen Monitoring of West Hackberry 117 Cavern Wells.

    SciTech Connect (OSTI)

    Bettin, Giorgia; Lord, David

    2015-02-01

    U.S. Strategic Petroleum Reserve (SPR) oil storage cavern West Hackberry 117 was tested under extended nitrogen monitoring following a successful mechanical integrity test in order to validate a newly developed hydrostatic column model to be used to differentiate between normal "tight" well behavior and small-leak behavior under nitrogen. High resolution wireline pressure and temperature data were collected during the test period and used in conjunction with the hydrostatic column model to predict the nitrogen/oil interface and the pressure along the entire fluid column from the bradenhead flange nominally at ground surface to bottom of brine pool. Results here and for other SPR caverns have shown that wells under long term nitrogen monitoring do not necessarily pressurize with a relative rate (P N2 /P brine) of 1. The theoretical relative pressure rate depends on the well configuration, pressure and the location of the nitrogen-oil interface and varies from well to well. For the case of WH117 the predicted rates were 0.73 for well A and 0.92 for well B. The measured relative pressurization rate for well B was consistent with the model prediction, while well A rate was found to be between 0.58-0.68. A number of possible reasons for the discrepancy between the model and measured rates of well A are possible. These include modeling inaccuracy, measurement inaccuracy or the possibility of the presence of a very small leak (below the latest calculated minimum detectable leak rate).

  16. Field project to obtain pressure core, wireline log, and production test data for evaluation of CO/sub 2/ flooding potential. Conoco MCA unit well No. 358, Maljamar Field, Lea County, New Mexico. Final report

    SciTech Connect (OSTI)

    Swift, T.E.; Kumar, R.M.; Marlow, R.E.; Wilhelm, M.H.

    1982-08-01

    Field operations, which were conducted as a cooperative effort between Conoco and Gruy Federal, began on January 16, 1980 when the well was spudded. The well was drilled to 3692 feet, and 18 cores recovered in 18 core-barrel runs (144 feet). Upon completion of the coring phase, the hole was drilled to a total depth of 4150 feet and a complete suite of geophysical logs was run. Logging was then followed by completion and testing by Concoco. Core porosities agreed well with computed log porosities. Core water saturation and computed log porosities agree fairly well from 3692 to 3712 feet, poorly from 3712 to 3820 feet and in a general way from 4035 to 4107 feet. Computer log analysis techniques did not improve the agreement of log versus core derived water saturations. However, both core and log analysis indicated the ninth zone had the highest residual hydrocarbon saturations. Residual oil saturation were 259 STB/acre-ft for the 4035 - 4055 feet interval, and 150 STB/acre-ft for the 3692 - 3718 feet interval. Nine BOPD was produced from the 4035 - 4055 feet interval and no oil was produced from 3692 to 3718 feet interval, qualitatively confirming the relative oil saturations. The low oil production in the zone from 4022 to 4055 and the lack of production from 3692 to 3718 feet indicated the zone to be at or near residual waterflood conditions as determined by log analysis. 68 figures, 11 tables.

  17. Automated robotic equipment for ultrasonic inspection of pressurizer heater wells

    DOE Patents [OSTI]

    Nachbar, Henry D.; DeRossi, Raymond S.; Mullins, Lawrence E.

    1993-01-01

    A robotic device for remotely inspecting pressurizer heater wells is provided which has the advantages of quickly, precisely, and reliably acquiring data at reasonable cost while also reducing radiation exposure of an operator. The device comprises a prober assembly including a probe which enters a heater well, gathers data regarding the condition of the heater well and transmits a signal carrying that data; a mounting device for mounting the probe assembly at the opening of the heater well so that the probe can enter the heater well; a first motor mounted on the mounting device for providing movement of the probe assembly in an axial direction; and a second motor mounted on the mounting device for providing rotation of the probe assembly. This arrangement enables full inspection of the heater well to be carried out.

  18. Dynamic model predicts well bore surge and swab pressures

    SciTech Connect (OSTI)

    Bing, Z.; Kaiji, Z.

    1996-12-30

    A dynamic well control model predicts surge and swab pressures more accurately than a steady-state model, thereby providing better estimates of pressure fluctuations when pipe is tripped. Pressure fluctuations from tripping pipe into a well can contribute to lost circulation, kicks,and well control problems. This dynamic method of predicting surge and swab pressures was verified in a full-scale test well in the Zhong Yuan oil field in China. Both the dynamic model and steady state model were verified through the test data. The test data showed the dynamic model can correctly predict downhole pressures from running or pulling pipe in a well; steady state models may result in relatively large prediction errors, especially in deeper wells.

  19. An inventory of wells of Oak Ridge National Laboratory 1992

    SciTech Connect (OSTI)

    Rush, R.M.; Gryder, R.K.; Baxter, F.P.

    1993-02-01

    The well inventory described in this report is a database of well information being developed for the Oak Ridge National Laboratory (ORNL) Groundwater Coordinator and the ORNL Groundwater Protection Program. Data are presented on 2071 ORNL wells as maps and as tabular data. A table of well identification aliases is given to permit correlation with earlier reports. Information is incomplete for many of the wells, and a form is provided for readers to provide missing or updated data. The goal of the developers of this data base is to produce a comprehensive inventory of wells at ORNL. This data base is being maintained to provide current information for the operational management of the ORNL groundwater monitoring system and for various users of groundwater data at ORNL.

  20. Novel Multidimensional Tracers for Geothermal Inter-Well Diagnostics |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Multidimensional Tracers for Geothermal Inter-Well Diagnostics Novel Multidimensional Tracers for Geothermal Inter-Well Diagnostics Novel Multidimensional Tracers for Geothermal Inter-Well Diagnostics presentation at the April 2013 peer review meeting held in Denver, Colorado. tang_peer2013.pdf (1.14 MB) More Documents & Publications Novel Multi-dimensional Tracers for Geothermal Inter-wall Diagnostics Use of Tracers to Characterize Fractures in Engineered Geothermal

  1. Controlled Rapid Pressurization Using Liquid Propellants for EGS Well

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Stimulation | Department of Energy Controlled Rapid Pressurization Using Liquid Propellants for EGS Well Stimulation Controlled Rapid Pressurization Using Liquid Propellants for EGS Well Stimulation Project objective: Investigate the use of non-toxicŽ or negligible environmental impact liquid propellants for the stimulation of geothermal fields. chemistry_grubelich_rapid_pressurization.pdf (299.78 KB) More Documents & Publications Energetic Materials for EGS Well Stimulation (solids,

  2. Investigation and evaluation of geopressured-geothermal wells

    SciTech Connect (OSTI)

    Hartsock, J.H.; Rodgers, J.A.

    1980-09-01

    Over the life of the project, 1143 wildcat wells were screened for possible use. Although many did not meet the program's requirement for sand development, a surprisingly large number were abandoned because of downhole mechanical problems. Only 94 of these wells were completed as commercial hydrocarbon producers. Five wells of opportunity were funded for testing. Of these, two were evaluated for their hydraulic energy, thermal energy, and recoverable methane, and three were abandoned because of mechanical problems. (MHR)

  3. EERE Success Story-Geothermal Wells: Advancing the Technology |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Geothermal Wells: Advancing the Technology EERE Success Story-Geothermal Wells: Advancing the Technology August 3, 2016 - 10:12am Addthis Photo Courtesy: Trabits Group Photo Courtesy: Trabits Group Photo Courtesy: Trabits Group Photo Courtesy: Trabits Group Photo Courtesy: Trabits Group Photo Courtesy: Trabits Group Geothermal resources are reservoirs of hot water that exist at varying temperatures and depths below the Earth's surface. Wells 1 mile deep or more can be

  4. Hydrocarbon segregation from well logs, Northern Monagas, Venezuela

    SciTech Connect (OSTI)

    Garcia, E. )

    1993-02-01

    A methodology is described to determine vertical hydrocarbon density variations in recent oil discoveries in Northern Monagas state, using well logs. Similarities and differences are established for models obtained in El Carito and El Tejero fault block-s. These models were confirmed using independent information, such as PVT analysis, RFT pressures, oil gravity and GOR's from initial production tests. To explain differences between the models, an hypothesis is proposed for the migration/segregation/deformation sequence in these two blocks, which accounts for the presence of lighter hydrocarbons in El Tejero block, even though it is 1700 ft structurally lower than El Carito. Based on this hypothesis, westward projection of the models predicts lighter hydrocarbons and similar porosities for Casupal-Mata Granda and Tonoro blocks, at depths considerably greater than in El Tejero block.

  5. Fabrication of A Quantum Well Based System for Truck HVAC

    Broader source: Energy.gov [DOE]

    Discusses performance differences between conventional modules and quantum well modules and details a conventional HZ-14 device, using bulk bismuth-telluride advantageous for truck HVAC applications.

  6. Newly Installed Alaska North Slope Well Will Test Innovative...

    Broader source: Energy.gov (indexed) [DOE]

    A fully instrumented well that will test innovative technologies for producing methane gas ... Energy Technology Laboratory, will test a technology that involves injecting ...

  7. Guide to Colorado Well Permits, Water Rights, and Water Administration...

    Open Energy Info (EERE)

    Colorado Well Permits, Water Rights, and Water Administration Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook:...

  8. Well Log Techniques At Raft River Geothermal Area (1977) | Open...

    Open Energy Info (EERE)

    the rock using well log data. Notes Information is given on the following logs: dual-induction focused log, including resistivity, sp, and conductivity; acoustic log; compensated...

  9. Observation Wells At Blue Mountain Area (Warpinski, Et Al., 2004...

    Open Energy Info (EERE)

    Blue Mountain Area (Warpinski, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Observation Wells At Blue Mountain Area (Warpinski,...

  10. Radiometrics At Salt Wells Area (Henkle, Et Al., 2005) | Open...

    Open Energy Info (EERE)

    Henkle, Et Al., 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Radiometrics At Salt Wells Area (Henkle, Et Al., 2005) Exploration Activity...

  11. Development Wells At Jemez Pueblo Area (DOE GTP) | Open Energy...

    Open Energy Info (EERE)

    Pueblo Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Development Wells At Jemez Pueblo Area (DOE GTP) Exploration Activity...

  12. Observation Wells At Lightning Dock Geothermal Area (Reeder,...

    Open Energy Info (EERE)

    Geothermal Area (Reeder, 1957) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Observation Wells At Lightning Dock Geothermal Area (Reeder, 1957)...

  13. Development Wells At Glass Buttes Area (DOE GTP) | Open Energy...

    Open Energy Info (EERE)

    Glass Buttes Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Development Wells At Glass Buttes Area (DOE GTP) Exploration Activity...

  14. Development Wells At Long Valley Caldera Geothermal Area (Associates...

    Open Energy Info (EERE)

    Associates, 1987) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Development Wells At Long Valley Caldera Geothermal Area (Associates, 1987)...

  15. Development Wells At Maui Area (DOE GTP) | Open Energy Information

    Open Energy Info (EERE)

    Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Development Wells At Maui Area (DOE GTP) Exploration Activity Details Location...

  16. Development Wells At Coso Geothermal Area (1985) | Open Energy...

    Open Energy Info (EERE)

    Coso Geothermal Area (1985) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Development Wells At Coso Geothermal Area (1985) Exploration Activity...

  17. Observation Wells At Lightning Dock Area (Warpinski, Et Al.,...

    Open Energy Info (EERE)

    Area (Warpinski, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Observation Wells At Lightning Dock Area (Warpinski, Et Al., 2004)...

  18. Observation Wells At The Needles Area (DOE GTP) | Open Energy...

    Open Energy Info (EERE)

    The Needles Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Observation Wells At The Needles Area (DOE GTP) Exploration Activity...

  19. Development Wells At The Needles Area (DOE GTP) | Open Energy...

    Open Energy Info (EERE)

    The Needles Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Development Wells At The Needles Area (DOE GTP) Exploration Activity...

  20. Fluid Inclusion Stratigraphy Interpretation of New Wells in the...

    Open Energy Info (EERE)

    Stratigraphy Interpretation of New Wells in the Coso Geothermal Field Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Paper: Fluid Inclusion...

  1. Development Wells At Silver Peak Area (DOE GTP) | Open Energy...

    Open Energy Info (EERE)

    Silver Peak Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Development Wells At Silver Peak Area (DOE GTP) Exploration Activity...

  2. Development Wells At Alum Area (DOE GTP) | Open Energy Information

    Open Energy Info (EERE)

    Alum Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Development Wells At Alum Area (DOE GTP) Exploration Activity Details...

  3. Observation Wells At Mccoy Geothermal Area (DOE GTP) | Open Energy...

    Open Energy Info (EERE)

    Mccoy Geothermal Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Observation Wells At Mccoy Geothermal Area (DOE GTP) Exploration...

  4. Stepout-Deepening Wells At Medicine Lake Area (Warpinski, Et...

    Open Energy Info (EERE)

    2) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Stepout-Deepening Wells At Medicine Lake Area (Warpinski, Et Al., 2002) Exploration Activity...

  5. Development Wells At Fallon Naval Air Station Area (Sabin, Et...

    Open Energy Info (EERE)

    Fallon Naval Air Station Area (Sabin, Et Al., 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Development Wells At Fallon Naval Air Station...

  6. Development Wells At Wister Area (DOE GTP) | Open Energy Information

    Open Energy Info (EERE)

    Wister Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Development Wells At Wister Area (DOE GTP) Exploration Activity Details...

  7. Development Wells At Fenton Hill HDR Geothermal Area (Dreesen...

    Open Energy Info (EERE)

    Dreesen, Et Al., 1987) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Development Wells At Fenton Hill HDR Geothermal Area (Dreesen, Et Al.,...

  8. 1999 Well Installation Report, Project Shoal Area, Churchill...

    Office of Legacy Management (LM)

    ... HC-8 Tritium Activities During DevelopmentTest Pumping . . . . . . . . . . . . 5-16 5-11 ... Well Construction and DevelopmentTest Pumping Activities . . . . . . . . . . . . ...

  9. Jim Wells County, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Wells County, Texas: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 27.7841718, -98.0465185 Show Map Loading map... "minzoom":false,"mappingse...

  10. Indian Wells, California: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    (Redirected from Indian Wells, CA) Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.6652315, -117.8731248 Show Map Loading map... "minzoom":false,"mappingserv...

  11. Wells Branch, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Wells Branch, Texas: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 30.4460353, -97.6794507 Show Map Loading map... "minzoom":false,"mappingse...

  12. NAC - 534 Underground Water and Wells | Open Energy Information

    Open Energy Info (EERE)

    - 534 Underground Water and Wells Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: NAC - 534 Underground Water and...

  13. Flowing Wells, Arizona: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Wells, Arizona: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 32.2939638, -111.0098178 Show Map Loading map... "minzoom":false,"mappingservic...

  14. Stepout-Deepening Wells At Lightning Dock Area (Warpinski, Et...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Stepout-Deepening Wells At Lightning Dock Area (Warpinski, Et Al., 2004) Exploration Activity Details Location...

  15. Mineral Wells, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Wells, Texas: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 32.8084605, -98.1128223 Show Map Loading map... "minzoom":false,"mappingservice":...

  16. Well conductor support structure and method for using

    SciTech Connect (OSTI)

    Turner, J.W.; Glasscock, M.S.

    1990-09-25

    This patent describes a conductor support module for supporting well conductors of an offshore platform, the conductor support module being separate from but integrable with the jacket of the offshore platform. It comprises: substantially parallel vertical support members; and horizontal conductor support members attached to the vertical support members, the vertical spacing between adjacent horizontal conductor support members being determined by the lateral support requirements of the well conductors; whereby lateral loads on the well conductors are transferred from the well conductors to the conductor support module and thereby to the offshore platform.

  17. Hawaii Well Abandonment Report Form (DLNR Form WAR) | Open Energy...

    Open Energy Info (EERE)

    Notice Form Topic Well Abandonment Report Organization State of Hawaii Commission on Water Resource Management Published Publisher Not Provided, 012008 DOI Not Provided Check...

  18. Method for determining formation quality factor from well log...

    Office of Scientific and Technical Information (OSTI)

    factor from well log data and its application to seismic reservoir characterization Citation Details In-Document Search Title: Method for determining formation quality factor ...

  19. Geothermal well log interpretation state of the art. Final report

    SciTech Connect (OSTI)

    Sanyal, S.K.; Wells, L.E.; Bickham, R.E.

    1980-01-01

    An in-depth study of the state of the art in Geothermal Well Log Interpretation has been made encompassing case histories, technical papers, computerized literature searches, and actual processing of geothermal wells from New Mexico, Idaho, and California. A classification scheme of geothermal reservoir types was defined which distinguishes fluid phase and temperature, lithology, geologic province, pore geometry, salinity, and fluid chemistry. Major deficiencies of Geothermal Well Log Interpretation are defined and discussed with recommendations of possible solutions or research for solutions. The Geothermal Well Log Interpretation study and report has concentrated primarily on Western US reservoirs. Geopressured geothermal reservoirs are not considered.

  20. Method speeds tapered rod design for directional well

    SciTech Connect (OSTI)

    Hu Yongquan; Yuan Xiangzhong

    1995-10-16

    Determination of the minimum rod diameter, from statistical relationships, can decrease the time needed for designing a sucker-rod string for a directional well. A tapered rod string design for a directional well is more complex than for a vertical well. Based on the theory of a continuous beam column, the rod string design in a directional well is a trial and error method. The key to reduce the time to obtain a solution is to rapidly determine the minimum rod diameter. This can be done with a statistical relationship. The paper describes sucker rods, design method, basic analysis rod design, and minimum rod diameter.

  1. Montana Board of Water Well Contractors Handbook | Open Energy...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Montana Board of Water Well Contractors HandbookPermittingRegulatory...

  2. Marble Hot Well Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration...

  3. Stepout-Deepening Wells At Medicine Lake Area (Warpinski, Et...

    Open Energy Info (EERE)

    Technique Well Deepening Activity Date Usefulness useful DOE-funding Unknown Notes Update to Warpinski, et al., 2002 References N. R. Warpinski, A. R. Sattler, R. Fortuna, D....

  4. Buckhorn Mineral Wells Space Heating Low Temperature Geothermal...

    Open Energy Info (EERE)

    Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Buckhorn Mineral Wells Space Heating Low Temperature Geothermal Facility Facility Buckhorn...

  5. Exploratory Well At Long Valley Caldera Geothermal Area (Sorey...

    Open Energy Info (EERE)

    and caldera basement. It was also the first well to intersect the metasedimentary landslide block at 466 m depth beneath the caldera's southern moat, a tumultuous mix of...

  6. WSDE Online System for Registering UIC Wells webpage | Open Energy...

    Open Energy Info (EERE)

    developers to register their UIC wells online. Author Washington State Department of Ecology Published Washington State Department of Ecology, 2014 DOI Not Provided Check for DOI...

  7. Exploratory Well At Roosevelt Hot Springs Geothermal Area (Petersen...

    Open Energy Info (EERE)

    Petersen, 1975) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Exploratory Well At Roosevelt Hot Springs Geothermal Area (Petersen, 1975)...

  8. Geothermal Well Testing and Evaluation | Open Energy Information

    Open Energy Info (EERE)

    and Evaluation Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Geothermal Well Testing and Evaluation Author Jon Ragnarsson Published Iceland...

  9. BLM Approves Salt Wells Geothermal Energy Projects | Open Energy...

    Open Energy Info (EERE)

    Energy Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: BLM Approves Salt Wells Geothermal Energy Projects Abstract Abstract unavailable....

  10. CDWR Well Permitting Forms and Associated Documents | Open Energy...

    Open Energy Info (EERE)

    Associated Documents Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: CDWR Well Permitting Forms and Associated Documents Abstract This webpage...

  11. EPA - Underground Injection Control Classes of Wells webpage...

    Open Energy Info (EERE)

    Underground Injection Control Classes of Wells webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA - Underground Injection Control Classes of...

  12. WSDE Underground Injection Control Well Registration Form | Open...

    Open Energy Info (EERE)

    Injection Control Well Registration Form Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Permit ApplicationPermit Application: WSDE Underground...

  13. Water Sampling At Salt Wells Area (Shevenell & Garside, 2003...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Water Sampling At Salt Wells Area (Shevenell & Garside, 2003) Exploration Activity Details...

  14. Water geochemistry study of Indian Wells Valley, Inyo and Kern...

    Open Energy Info (EERE)

    Final report Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Water geochemistry study of Indian Wells Valley, Inyo and Kern Counties, California....

  15. Water Sampling At Salt Wells Area (Coolbaugh, Et Al., 2006) ...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Water Sampling At Salt Wells Area (Coolbaugh, Et Al., 2006) Exploration Activity Details...

  16. Exploratory Well At Long Valley Caldera Geothermal Area (Suemnicht...

    Open Energy Info (EERE)

    Exploratory Well Activity Date 1985 - 1985 Usefulness useful DOE-funding Unknown Exploration Basis After several temperature-gradient holes were drilled in 1982 to the...

  17. Energetic Materials for EGS Well Stimulation (solids, liquids, gases)

    Broader source: Energy.gov [DOE]

    Energetic Materials for EGS Well Stimulation (solids, liquids, gases) presentation at the April 2013 peer review meeting held in Denver, Colorado.

  18. Progress and issues in single well seismic imaging | Open Energy...

    Open Energy Info (EERE)

    Paper: Progress and issues in single well seismic imaging Authors Thomas M. Daley, Ernest L. Majer, Roland Gritto and Jerry M. Harris Conference 70th Annual International Meeting...

  19. 2013 strategic petroleum reserve big hill well integrity grading report.

    SciTech Connect (OSTI)

    Lord, David L.; Roberts, Barry L.; Lord, Anna C. Snider; Bettin, Giorgia; Sobolik, Steven Ronald; Park, Byoung Yoon; Rudeen, David Keith; Eldredge, Lisa; Wynn, Karen; Checkai, Dean; Perry, James Thomas

    2014-02-01

    This report summarizes the work performed in developing a framework for the prioritization of cavern access wells for remediation and monitoring at the Big Hill Strategic Petroleum Reserve site. This framework was then applied to all 28 wells at the Big Hill site with each well receiving a grade for remediation and monitoring. Numerous factors affecting well integrity were incorporated into the grading framework including casing survey results, cavern pressure history, results from geomechanical simulations, and site geologic factors. The framework was developed in a way as to be applicable to all four of the Strategic Petroleum Reserve sites.

  20. Raft River Geothermal Field Well Head Brine Sample

    SciTech Connect (OSTI)

    Tim Lanyk

    2015-12-18

    Raw data and data workup of assay for real-world brine sample. Brine sample was taken at the well head.

  1. Controlled Source Frequency-Domain Magnetics At Salt Wells Area...

    Open Energy Info (EERE)

    At Salt Wells Area (Montgomery, Et Al., 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Controlled Source Frequency-Domain Magnetics At...

  2. RAPID/Geothermal/Well Field/California | Open Energy Information

    Open Energy Info (EERE)

    necessary drilling fees to DOGGR. Following review, DOGGR will issue a Permit to Conduct Geothermal Operations to the developer. Local Well Field Process not available Policies &...

  3. Idaho Well Construction and Drilling Forms Webpage | Open Energy...

    Open Energy Info (EERE)

    Not Provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Idaho Well Construction and Drilling Forms Webpage Citation Idaho Department...

  4. Seismotectonics of the Coso Range-Indian Wells Valley region...

    Open Energy Info (EERE)

    Jeffrey R. Unruh, Egill Hauksson, Francis C. Monastero, Robert J. Twiss and Jonathan C. Lewis. 2002. Seismotectonics of the Coso Range-Indian Wells Valley region, California:...

  5. MHK Technologies/Wells Turbine for OWC | Open Energy Information

    Open Energy Info (EERE)

    Turbine for OWC < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Wells Turbine for OWC.png Technology Profile Primary Organization Voith Hydro...

  6. Well Log Data At North Brawley Geothermal Area (Matlick & Jayne...

    Open Energy Info (EERE)

    to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Well Log Data At North Brawley Geothermal Area (Matlick & Jayne, 2008) Exploration Activity Details...

  7. Well Log Data At North Brawley Geothermal Area (Edmunds & W....

    Open Energy Info (EERE)

    to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Well Log Data At North Brawley Geothermal Area (Edmunds & W., 1977) Exploration Activity Details...

  8. Well Log Data At Blue Mountain Geothermal Area (Fairbank & Niggemann...

    Open Energy Info (EERE)

    to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Well Log Data At Blue Mountain Geothermal Area (Fairbank & Niggemann, 2004) Exploration Activity...

  9. Method and apparatus for monitoring well tubing fluid (Patent...

    Office of Scientific and Technical Information (OSTI)

    Country of Publication: United States Language: English Subject: 02 PETROLEUM; 03 NATURAL GAS; CORROSION INHIBITORS; MONITORING; WELL CASINGS; CORROSION PROTECTION; MONITORS; ...

  10. Well Log Techniques At Newberry Caldera Area (DOE GTP) | Open...

    Open Energy Info (EERE)

    navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Well Log Techniques At Newberry Caldera Area (DOE GTP) Exploration Activity Details Location Newberry...

  11. Well Log Techniques At Coso Geothermal Area (1985) | Open Energy...

    Open Energy Info (EERE)

    navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Well Log Techniques At Coso Geothermal Area (1985) Exploration Activity Details Location Coso Geothermal...

  12. In-well vapor stripping drilling and characterization work plan

    SciTech Connect (OSTI)

    Koegler, K.J.

    1994-03-13

    This work plan provides the information necessary for drilling, sampling, and hydrologic testing of wells to be completed in support of a demonstration of the in-well vapor stripping system. The in-well vapor stripping system is a remediation technology designed to preferentially extract volatile organic compounds (VOCs) from contaminated groundwater by converting them to a vapor phase. Air-lift pumping is used to lift and aerate groundwater within the well. The volatiles escaping the aerated water are drawn off by a slight vacuum and treated at the surface while the water is allowed to infiltrate the vadose zone back to the watertable.

  13. West Flank Coso FORGE: well photos and notes

    SciTech Connect (OSTI)

    Doug Blankenship

    2015-12-21

    Photos and detailed down-hole lithology notes for wells CGEH-1 and 74-2 at the West Flank Coso, Ca FORGE location.

  14. Texas--State Offshore Natural Gas Withdrawals from Gas Wells...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gas Wells (Million Cubic Feet) Texas--State Offshore Natural Gas Withdrawals from Gas ... Release Date: 06302016 Next Release Date: 07292016 Referring Pages: Offshore Gross ...

  15. Alaska--State Offshore Natural Gas Withdrawals from Oil Wells...

    U.S. Energy Information Administration (EIA) Indexed Site

    Oil Wells (Million Cubic Feet) Alaska--State Offshore Natural Gas Withdrawals from Oil ... Release Date: 06302016 Next Release Date: 07292016 Referring Pages: Offshore Gross ...

  16. Federal Offshore--Alabama Natural Gas Withdrawals from Oil Wells...

    U.S. Energy Information Administration (EIA) Indexed Site

    Oil Wells (Million Cubic Feet) Federal Offshore--Alabama Natural Gas Withdrawals from Oil ... Release Date: 06302016 Next Release Date: 07292016 Referring Pages: Offshore Gross ...

  17. Federal Offshore--Alabama Natural Gas Withdrawals from Gas Wells...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gas Wells (Million Cubic Feet) Federal Offshore--Alabama Natural Gas Withdrawals from Gas ... Release Date: 06302016 Next Release Date: 07292016 Referring Pages: Offshore Gross ...

  18. Alaska--State Offshore Natural Gas Withdrawals from Gas Wells...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gas Wells (Million Cubic Feet) Alaska--State Offshore Natural Gas Withdrawals from Gas ... Release Date: 06302016 Next Release Date: 07292016 Referring Pages: Offshore Gross ...

  19. Alabama--State Offshore Natural Gas Withdrawals from Gas Wells...

    U.S. Energy Information Administration (EIA) Indexed Site

    Withdrawals from Gas Wells (Million Cubic Feet) Alabama--State Offshore Natural Gas ... Release Date: 06302016 Next Release Date: 07292016 Referring Pages: Offshore Gross ...

  20. Louisiana--State Offshore Natural Gas Withdrawals from Gas Wells...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gas Wells (Million Cubic Feet) Louisiana--State Offshore Natural Gas Withdrawals from Gas ... Release Date: 06302016 Next Release Date: 07292016 Referring Pages: Offshore Gross ...

  1. Federal Offshore--Texas Natural Gas Withdrawals from Gas Wells...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gas Wells (Million Cubic Feet) Federal Offshore--Texas Natural Gas Withdrawals from Gas ... Release Date: 06302016 Next Release Date: 07292016 Referring Pages: Offshore Gross ...

  2. Texas--State Offshore Natural Gas Withdrawals from Oil Wells...

    U.S. Energy Information Administration (EIA) Indexed Site

    Oil Wells (Million Cubic Feet) Texas--State Offshore Natural Gas Withdrawals from Oil ... Release Date: 06302016 Next Release Date: 07292016 Referring Pages: Offshore Gross ...

  3. Louisiana--State Offshore Natural Gas Withdrawals from Oil Wells...

    U.S. Energy Information Administration (EIA) Indexed Site

    Oil Wells (Million Cubic Feet) Louisiana--State Offshore Natural Gas Withdrawals from Oil ... Release Date: 06302016 Next Release Date: 07292016 Referring Pages: Offshore Gross ...

  4. Federal Offshore--Texas Natural Gas Withdrawals from Oil Wells...

    U.S. Energy Information Administration (EIA) Indexed Site

    Oil Wells (Million Cubic Feet) Federal Offshore--Texas Natural Gas Withdrawals from Oil ... Release Date: 06302016 Next Release Date: 07292016 Referring Pages: Offshore Gross ...

  5. Diffusion Multilayer Sampling of Ground Water in Five Wells at...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis of MSE Cores Tuba City, Arizona, Site Analysis of Contaminant Rebound in Ground Water in Extraction Wells at the Tuba City, Arizona, Site Vertical Distribution of ...

  6. ,"New Mexico Natural Gas Gross Withdrawals from Oil Wells (MMcf...

    U.S. Energy Information Administration (EIA) Indexed Site

    Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","New Mexico Natural Gas Gross Withdrawals from Oil Wells (MMcf)",1,"Annual",2014 ,"Release...

  7. ,"New Mexico Natural Gas Gross Withdrawals from Gas Wells (MMcf...

    U.S. Energy Information Administration (EIA) Indexed Site

    Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","New Mexico Natural Gas Gross Withdrawals from Gas Wells (MMcf)",1,"Annual",2014 ,"Release...

  8. Salt Wells Geothermal Energy Projects Environmental Impact Statement...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Salt Wells Geothermal Energy Projects Environmental Impact Statement Abstract Abstract unavailable....

  9. Hostile wells: the borehole seismic challenge | Open Energy Informatio...

    Open Energy Info (EERE)

    Web Site: Hostile wells: the borehole seismic challenge Author William Wills Published Oil and Gas Engineer - Subsea & Seismic, 2013 DOI Not Provided Check for DOI availability:...

  10. ENEL Salt Wells Geothermal Facility | Open Energy Information

    Open Energy Info (EERE)

    Salt Wells Geothermal Facility Sector Geothermal energy Location Information Location Churchill, NV Coordinates 39.651603422063, -118.49778413773 Loading map......

  11. Quantum Well Thermoelectrics and Waste Heat Recovery | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    High-Efficiency Quantum-Well Thermoelectrics for Waste Heat Power Generation Recent Progress in the Development of High Efficiency Thermoelectrics High Temperature Thermoelectric ...

  12. Observation Wells At East Brawley Area (Matlick & Jayne, 2008...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Observation Wells At East Brawley Area (Matlick & Jayne, 2008) Exploration Activity Details...

  13. Follow-up Inspection on Characterization Wells at Los Alamos...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Wells Monitoring Program had been transferred to the New Mexico Environmental Department. ... Order on Consent entered into by the New Mexico Environmental Department, the Department ...

  14. Estimating Well Costs for Enhanced Geothermal System Applications

    SciTech Connect (OSTI)

    K. K. Bloomfield; P. T. Laney

    2005-08-01

    The objective of the work reported was to investigate the costs of drilling and completing wells and to relate those costs to the economic viability of enhanced geothermal systems (EGS). This is part of a larger parametric study of major cost components in an EGS. The possibility of improving the economics of EGS can be determined by analyzing the major cost components of the system, which include well drilling and completion. Determining what costs in developing an EGS are most sensitive will determine the areas of research to reduce those costs. The results of the well cost analysis will help determine the cost of a well for EGS development.

  15. RRC - Injection/Disposal Well Permitting, Testing, and Monitoring...

    Open Energy Info (EERE)

    InjectionDisposal Well Permitting, Testing, and Monitoring manual Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Guide...

  16. Well Log Data At Valles Caldera - Redondo Geothermal Area (Shevenell...

    Open Energy Info (EERE)

    extending to the AET-4 well near Jemez Springs. References Lisa Shevenell, Fraser E. Goff, Dan Miles, Al Waibel, Chandler Swanberg (1988) Lithologic Descriptions and Temperature...

  17. Resonant acoustic transducer system for a well drilling string

    DOE Patents [OSTI]

    Kent, William H.; Mitchell, Peter G.

    1981-01-01

    For use in transmitting acoustic waves propagated along a well drilling string, a piezoelectric transducer is provided operating in the relatively low loss acoustic propagation range of the well drilling string. The efficiently coupled transmitting transducer incorporates a mass-spring-piezoelectric transmitter combination permitting resonant operation in the desired low frequency range.

  18. Resonant acoustic transducer system for a well drilling string

    DOE Patents [OSTI]

    Nardi, Anthony P.

    1981-01-01

    For use in transmitting acoustic waves propated along a well drilling string, a piezoelectric transducer is provided operating in the relatively low loss acoustic propagation range of the well drilling string. The efficiently coupled transmitting transducer incorporates a mass-spring-piezoelectric transmitter combination permitting a resonant operation in the desired low frequency range.

  19. Completion report for well ER-30-1

    SciTech Connect (OSTI)

    1995-12-01

    Well ER-30-1 was drilled for the U.S. Department of Energy (DOE), Nevada Operations Office, in support of the Nevada Environmental Restoration Project at the Nevada Test Site (NTS). IT Corporation (IT) was the principal environmental contractor for the project. The roles and responsibilities of IT and other contractors involved in the project are described in the Raytheon Services Nevada (RSN) Drilling and Completion Programs and the Underground Test Area Operable Unit Project Management Plan. The Well ER-30-1 investigation is part of the DOE`s Underground Test Area (UGTA) Project at the NTS, the goals of which include collecting geological, geophysical, hydrological, and water-chemistry data from new and existing wells to define groundwater migration pathways, rates of migration, and groundwater quality at the NTS. The well will become part of the UGTA monitoring well network.

  20. Testing geopressured geothermal reservoirs in existing wells: Detailed completions prognosis for geopressured-geothermal well of opportunity, prospect #1

    SciTech Connect (OSTI)

    Kennedy, Clovis A.

    1980-04-03

    This prospective well of opportunity was originally drilled and completed as a gas producer by Wrightsman Investment Company in early 1973. The original and present producing interval was from 15,216 to 15,238 feet. IMC Exploration Company, Inc. acquired the property from Wrightsman and is the present owner operator. The well is presently shut in s a non-economic producer and IMC proposed to perform plug and abandonment operations in April, 1980. This well has a good geopressured-geothermal water sand behind the 5-1/2 inch casing that has 94 feet of net sand thickness. Pursuant to DOE/NVO authorization of March 11,1980, Eaton negotiated an option agreement with IMC whereby IMC would delay their abandonment operations for a period of 90 days to permit DOE to evaluate the well for geopressure-geothermal testing. The IMC-Eaton option agreements provide that IMG will delay plugging the well until June 15, 1980. If Eaton exercises its option to acquire the well, IMC will sell the well bore, and an adjacent salt water disposal well, to Eaton for the sole consideration of Eaton assuming the obligation to plug and abandon the wells in accordance with lease and regulatory requirements. If Eaton does not exercise its option, then Eaton will pay IMC $95,000 cash and IMC will proceed with plugging and abandonment at the termination of the option period.

  1. Method for polymer synthesis in a reaction well

    DOE Patents [OSTI]

    Brennan, Thomas M.

    1998-01-01

    A method of synthesis for building a polymer chain, oligonucleotides in particular, by sequentially adding monomer units to at least one solid support for growing and immobilizing a polymer chain thereon in a liquid reagent solution. The method includes the step of: A) depositing a liquid reagent in a reaction well (26) in contact with at least one solid support and at least one monomer unit of the polymer chain affixed to the solid support. The well (26) includes at least one orifice (74) extending into the well (26), and is of a size and dimension to form a capillary liquid seal to retain the reagent solution in the well (26) to enable polymer chain growth on the solid support. The method further includes the step of B) expelling the reagent solution from the well (26), while retaining the polymer chain therein. This is accomplished by applying a first gas pressure to the reaction well such that a pressure differential between the first gas pressure and a second gas pressure exerted on an exit (80) of the orifice (74) exceeds a predetermined amount sufficient to overcome the capillary liquid seal and expel the reagent solution from the well (26) through the orifice exit (80).

  2. Method for polymer synthesis in a reaction well

    DOE Patents [OSTI]

    Brennan, T.M.

    1998-09-29

    A method of synthesis is described for building a polymer chain, oligonucleotides in particular, by sequentially adding monomer units to at least one solid support for growing and immobilizing a polymer chain thereon in a liquid reagent solution. The method includes the step of: (A) depositing a liquid reagent in a reaction well in contact with at least one solid support and at least one monomer unit of the polymer chain affixed to the solid support. The well includes at least one orifice extending into the well, and is of a size and dimension to form a capillary liquid seal to retain the reagent solution in the well to enable polymer chain growth on the solid support. The method further includes the step of (B) expelling the reagent solution from the well, while retaining the polymer chain therein. This is accomplished by applying a first gas pressure to the reaction well such that a pressure differential between the first gas pressure and a second gas pressure exerted on an exit of the orifice exceeds a predetermined amount sufficient to overcome the capillary liquid seal and expel the reagent solution from the well through the orifice exit. 9 figs.

  3. Economic analysis of vertical wells for coalbed methane recovery

    SciTech Connect (OSTI)

    Not Available

    1981-04-01

    Previous economic studies of the recovery and utilization of methane from coalbeds using vertical wells were based on drainage in advance of mining where a single seam is drained with well spacing designed for rapid predrainage. This study extends the earlier work and shows that methane recovery costs can be reduced significantly by increasing well spacing and draining multiple coalbeds. A favorable return on investment can be realized in many geologic settings using this method. Sensitivity of recovery economics to certain development costs and parametric variations are also examined as are the economics of three methane utilization options.

  4. Pulsed rectifier limitations for well casing cathodic protection

    SciTech Connect (OSTI)

    Dabkowski, J. [Electro Sciences, Inc., Crystal Lake, IL (United States)

    1995-10-01

    Rectifier current pulses applied to deep well casings suffer considerable waveform deterioration as well depth increases. Cathodic protection (CP) attributed to the use of a pulsed rectifier will not be effective below a certain depth, which is a function of pulse characteristics and soil resistivity. A hypothetical 3,000-m length well casing is modeled as a distributed lossy electrical transmission line. Below 300- to 500-m depths, the higher frequency of the pulse is severely attenuated. Therefore, the CP process results at greater depths will not differ significantly from those obtained with a nonpulsed DC rectifier.

  5. Deep Well #4 Backup Power Systems Project Closeout Report

    SciTech Connect (OSTI)

    Jeremy Westwood

    2010-04-01

    The project scope was to install a diesel generated power source to deep well 4 in addition to the existing commercial power source. The diesel power source and its fuel supply system shall be seismically qualified to withstand a Performance Category 4 (PC-4) seismic event. This diesel power source will permit the deep well to operate during a loss of commercial power. System design will incorporate the ability to select and transfer power between the new diesel power source and commercial power sources for the the deep well motor and TRA-672 building loads.

  6. U.S. Geothermal Drills Another Prolific Well at Neal Hot Springs...

    Open Energy Info (EERE)

    for Project Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: U.S. Geothermal Drills Another Prolific Well at Neal Hot Springs Completes Production Wells...

  7. Free Green Energy GreenWell Power JV | Open Energy Information

    Open Energy Info (EERE)

    GreenWell Power JV Jump to: navigation, search Name: Free Green Energy & GreenWell Power JV Place: Texas Sector: Geothermal energy Product: US-based geothermal electricity...

  8. Property:FirstWellName | Open Energy Information

    Open Energy Info (EERE)

    (DB1) + C Chena Geothermal Area + Well 7 + F Fenton Hill HDR Geothermal Area + GT-1 + K Kilauea East Rift Geothermal Area + HGP-A + L Lightning Dock Geothermal Area + TFD 55-7...

  9. Exploratory Well At Coso Geothermal Area (1967) | Open Energy...

    Open Energy Info (EERE)

    Notes Coso Hot Springs well No. 1 drilled to 114.3 m. References Fournier, R. O.; Thompson, J. M.; Austin, C. F. (1 January 1978) Chemical analyses and preliminary...

  10. SMOOTH OIL & GAS FIELD OUTLINES MADE FROM BUFFERED WELLS

    U.S. Energy Information Administration (EIA) Indexed Site

    The VBA code provided at the bottom of this document is an updated version (from ArcGIS ... but with "smu" suffix added to name. The first layer must contain the well points ...

  11. Catalytic destruction of groundwater contaminants in reactive extraction wells

    DOE Patents [OSTI]

    McNab, Jr., Walt W.; Reinhard, Martin

    2002-01-01

    A system for remediating groundwater contaminated with halogenated solvents, certain metals and other inorganic species based on catalytic reduction reactions within reactive well bores. The groundwater treatment uses dissolved hydrogen as a reducing agent in the presence of a metal catalyst, such a palladium, to reduce halogenated solvents (as well as other substituted organic compounds) to harmless species (e.g., ethane or methane) and immobilize certain metals to low valence states. The reactive wells function by removing water from a contaminated water-bearing zone, treating contaminants with a well bore using catalytic reduction, and then reinjecting the treated effluent into an adjacent water-bearing zone. This system offers the advantages of a compact design with a minimal surface footprint (surface facilities) and the destruction of a broad suite of contaminants without generating secondary waste streams.

  12. Well casing-based geophysical sensor apparatus, system and method

    DOE Patents [OSTI]

    Daily, William D.

    2010-03-09

    A geophysical sensor apparatus, system, and method for use in, for example, oil well operations, and in particular using a network of sensors emplaced along and outside oil well casings to monitor critical parameters in an oil reservoir and provide geophysical data remote from the wells. Centralizers are affixed to the well casings and the sensors are located in the protective spheres afforded by the centralizers to keep from being damaged during casing emplacement. In this manner, geophysical data may be detected of a sub-surface volume, e.g. an oil reservoir, and transmitted for analysis. Preferably, data from multiple sensor types, such as ERT and seismic data are combined to provide real time knowledge of the reservoir and processes such as primary and secondary oil recovery.

  13. ARM 36-21-810 - Well Abandonment | Open Energy Information

    Open Energy Info (EERE)

    36-21-810 - Well AbandonmentLegal Published NA Year Signed or Took Effect 2010 Legal Citation ARM 36.21.810 DOI Not Provided Check for DOI availability: http:crossref.org Online...

  14. NMOSE Artesian Well Plan of Operations | Open Energy Information

    Open Energy Info (EERE)

    Well Plan of OperationsLegal Published NA Year Signed or Took Effect 2011 Legal Citation Not provided DOI Not Provided Check for DOI availability: http:crossref.org...

  15. DOE - Office of Legacy Management -- Besley-Wells - Wisconsin...

    Office of Legacy Management (LM)

    Also see Documents Related to Besley-Wells - Wisconsin WI.03-1 - DOE Memorandum; Williams to File; Subject: Elimination of Sites from FUSRAP; August 29, 1994 WI.03-2 -...

  16. US Geothermal Updates Status of Development Projects New Wells...

    Open Energy Info (EERE)

    Hot Springs Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: US Geothermal Updates Status of Development Projects New Wells Drilled at Neal Hot Springs...

  17. Bureau of Land Management - Sundry Notices and Reports on Wells...

    Open Energy Info (EERE)

    to: navigation, search OpenEI Reference LibraryAdd to library Form: Bureau of Land Management - Sundry Notices and Reports on Wells Abstract This page links to the BLM Sundry...

  18. Indian Wells, California: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Indian Wells is a city in Riverside County, California. It falls under California's 45th...

  19. Wells County, Indiana: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Wells County is a county in Indiana. Its FIPS County Code is 179. It is classified as ASHRAE...

  20. Chemistry of spring and well waters on Kilauea Volcano, Hawaii...

    Open Energy Info (EERE)

    determine the chemistry of dilute meteoric water, mixtures with sea water,and thermal water. Data for well and spring samples of non-thermal water indicate that mixing with sea...

  1. U.S. Geothermal Announces Successful Completion of First Well...

    Open Energy Info (EERE)

    Hot Springs Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: U.S. Geothermal Announces Successful Completion of First Well at Neal Hot Springs Abstract...

  2. Raser Receives Third Party Analysis on Well Field

    Broader source: Energy.gov [DOE]

    Raser Technologies, Inc. (NYSE Arca: RZ) today announced that GeothermEx Inc., an independent third party geothermal consultant, has completed and delivered its analysis of the well field for Raser's Thermo geothermal power project near Beaver, Utah.

  3. Exploratory Well At Long Valley Caldera Geothermal Area (Sorey...

    Open Energy Info (EERE)

    Fish Hatchery Springs in preparation for the siting of a second binary geothermal power plant, which included the CW-2 and the MPLP CW-3 (a.k.a. Chance 3) wells along the...

  4. Oregon Natural Gas Gross Withdrawals from Coalbed Wells (Million Cubic

    Gasoline and Diesel Fuel Update (EIA)

    Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's 24,171 52,846 49,661 2000's 69,451 82,542 55,854 74,400 88,734 87,998 75,186 101,503 116,637 108,705 2010's 108,827 60,252 81,444 101,930 90,099 113

    09 2010 2011 2012 2013 2014 View History Gross Withdrawals 821 1,407 1,344 770 770 950 1979-2014 From Gas Wells 821 1,407 1,344 770 770 950 1979-2014 From Oil Wells 0 0 0 0 0 0 1996-2014 From Shale Gas Wells 0 0 0 0 0 0 2007-2014 From Coalbed Wells 0 0 0

  5. Double Well Mass Filter | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Double Well Mass Filter The disclosure described a new plasma configuration for separating elements by their mass, which would have applications in nuclear waste remediation and nuclear fuel reproccessing. No.: M-870 Inventor(s): Nathaniel J Fisch

  6. Washington State Department of Ecology: Replacement Wells Requiring...

    Open Energy Info (EERE)

    Ecology: Replacement Wells Requiring a Water Right Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Washington State Department of...

  7. OIL WELL REMEDIATION IN CLAY AND WAYNE COUNTIES, IL

    SciTech Connect (OSTI)

    Peter L. Dakuras; Larry Stieber; Dick Young

    2003-02-01

    This is the first technical progress report of the remediation of two wells and a water injection well in Clay County, Illinois. The location is identified as the Routt lease and the wells will be identified as the Routt No.3 and Routt No.4 respectively throughout this report. The Clay County portion of this project has met all legal, financial, and environmental requirements to drill and /or pump oil at this lease. We have also obtained all available information about this site and have taken the necessary steps to improve access roads, dig the necessary pits and build the necessary firewalls. Both wells have been drilled to the Salem formation. Gas gun technology was used to stimulate the reservoir of the Routt No.3. This report will address the technical aspects of the remediation.

  8. Salt Wells, Eight Mile Flat | Open Energy Information

    Open Energy Info (EERE)

    Eight Mile Flat Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Salt Wells, Eight Mile Flat Abstract Abstract unavailable. Author Nevada Bureau...

  9. 9000 wells planned for heavy oil field. [Canada

    SciTech Connect (OSTI)

    Not Available

    1981-05-01

    Beginning in 1983, Esso Resources Canada Ltd. will begin drilling the first of an estimated 9000 directional crude bitumen wells in the tar sands at Cold Lake, Alberta, Canada, the final wells being drilled in the year 2008. The area, covering 50 sq miles of extreme E. Alberta along the Saskatchewan border, contains one of the richest deposits of heavy oil sands in Canada. The company and future partners will drill the bitumen wells directionally into the shallow clearwater formation, which can be reached at approx. 100 m (330 ft). The formation contains an estimated 80 billion bbl of crude bitumen at a rate of 60,000 bpd for 25 yr. This volume of crude will be refined in an upgrading plant to 140,000 bpd of synthetic crude oil. When completed, the Cold Lake project will be one of the largest facilities for producing crude bitumen from wells in the world.

  10. Midcontinent well operators learn advantages of coiled-tubing techniques

    SciTech Connect (OSTI)

    Lyle, D.

    1995-07-01

    From well cleanup to velocity strings to squeeze jobs, more Midcontinent operators are adding coiled-tubing methods to their oilfield techniques. The advantages of these techniques are discussed.

  11. Missouri Natural Gas Gross Withdrawals from Coalbed Wells (Million Cubic

    Gasoline and Diesel Fuel Update (EIA)

    Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's 7,465 16,034 19,428 2000's 30,481 32,805 29,911 21,778 24,574 31,831 32,480 41,067 43,009 29,807 2010's 40,216 37,626 50,538 37,119 34,825 40,10

    NA NA NA NA 9 9 1967-2014 From Gas Wells NA NA NA NA 8 8 1967-2014 From Oil Wells NA NA NA NA 1 * 2007-2014 From Shale Gas Wells NA NA NA NA 0 0 2007-2014 From Coalbed Wells NA NA NA NA 0 0 2007-2014 Repressuring NA NA NA NA 0 0 2007-2014 Vented and Flared

  12. Nevada Natural Gas Gross Withdrawals from Coalbed Wells (Million Cubic

    Gasoline and Diesel Fuel Update (EIA)

    Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's 75,656 84,093 89,954 2000's 121,054 108,510 109,605 115,960 136,945 147,743 166,867 171,473 180,668 192,049 2010's 175,837 162,778 189,291 181,326 167,916 207,145

    4 3 4 3 3 1991-2014 From Gas Wells 0 0 0 0 0 3 2006-2014 From Oil Wells 4 4 3 4 3 * 1991-2014 From Shale Gas Wells 0 0 0 0 0 0 2007-2014 From Coalbed Wells 0 0 0 0 0 0 2006-2014 Repressuring 0 0 0 0 0 0 2006-2014 Vented and Flared 0 0 0 0

  13. RAPID/Geothermal/Well Field/Hawaii | Open Energy Information

    Open Energy Info (EERE)

    process for the proposed drilling activities. Local Well Field Process not available Policies & Regulations H.A.R. 13-185 - Rules of Practice and Procedure for Geothermal and...

  14. Electrode wells for powerline-frequency electrical heating of soils

    DOE Patents [OSTI]

    Buettner, Harley M.; Daily, William D.; Aines, Roger D.; Newmark, Robin L.; Ramirez, Abelardo L.; Siegel, William H.

    1999-01-01

    An electrode well for use in powerline-frequency heating of soils for decontamination of the soil. Heating of soils enables the removal of volatile organic compounds from soil when utilized in combination with vacuum extraction. A preferred embodiment of the electrode well utilizes a mild steel pipe as the current-carrying conductor to at least one stainless steel electrode surrounded by a conductive backfill material, preferably graphite or steel shot. A covering is also provided for electrically insulating the current-carrying pipe. One of the electrode wells is utilized with an extraction well which is under subatmospheric pressure to withdraw the volatile material, such as gasoline and trichioroethylene (TCE) as it is heated.

  15. Electrode wells for powerline-frequency electrical heating of soils

    DOE Patents [OSTI]

    Buettner, H.M.; Daily, W.D.; Aines, R.D.; Newmark, R.L.; Ramirez, A.L.; Siegel, W.H.

    1999-05-25

    An electrode well is described for use in powerline-frequency heating of soils for decontamination of the soil. Heating of soils enables the removal of volatile organic compounds from soil when utilized in combination with vacuum extraction. A preferred embodiment of the electrode well utilizes a mild steel pipe as the current-carrying conductor to at least one stainless steel electrode surrounded by a conductive backfill material, preferably graphite or steel shot. A covering is also provided for electrically insulating the current-carrying pipe. One of the electrode wells is utilized with an extraction well which is under subatmospheric pressure to withdraw the volatile material, such as gasoline and trichloroethylene (TCE) as it is heated. 4 figs.

  16. Exploratory Well At Raft River Geothermal Area (1950) | Open...

    Open Energy Info (EERE)

    and Crank wells, encountered boiling water. References Diek, A.; White, L.; Roegiers, J.-C.; Moore, J.; McLennan, J. D. (1 January 2012) BOREHOLE PRECONDITIONING OF GEOTHERMAL...

  17. Salt Wells Geothermal Exploratory Drilling Program EA(DOI-BLM...

    Open Energy Info (EERE)

    Exploratory Drilling Program EA (DOI-BLM-NV-C010-2009-0006-EA) Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Salt Wells Geothermal Exploratory...

  18. Raft River monitor well potentiometric head responses and water...

    Open Energy Info (EERE)

    flow system Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Raft River monitor well potentiometric head responses and water quality as related to the...

  19. NMOCD - Form G-105 - Geothermal Resources Well Log | Open Energy...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library General: NMOCD - Form G-105 - Geothermal Resources Well Log Author State of New Mexico Energy and Minerals...

  20. NMOCD - Form G-106 - Geothermal Resources Well Summary Report...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library General: NMOCD - Form G-106 - Geothermal Resources Well Summary Report Author State of New Mexico Energy and...