National Library of Energy BETA

Sample records for weldon spring site

  1. Weldon Spring Site Archived Soil & Groundwater Master Reports...

    Office of Environmental Management (EM)

    Weldon Spring Site Archived Soil & Groundwater Master Reports PDF icon Weldon Spring Site - Chemical Plant East Plume PDF icon Weldon Spring Site - Chemical Plant Quarry PDF icon ...

  2. Executive summary: Weldon Spring Site Environmental Report for calendar year 1992. Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    This report has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project. The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. The scope of the environmental monitoring program at the Weldon Spring site has changed since it was initiated. Previously, the program focused on investigations of the extent and level of contaminants in the groundwater, surface waters, buildings, and air at the site. In 1992, the level of remedial activities required monitoring for potential impacts of those activities, particularly on surface water runoff and airborne effluents. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site; estimates of effluent releases; and trends in groundwater contaminant levels. Also, applicable compliance requirements, quality assurance programs, and special studies conducted in 1992 to support environmental protection programs are reviewed.

  3. Weldon Spring Site Federal Facility Agreement

    Office of Legacy Management (LM)

    Response to Comments September 26, 2006 Weldon Spring Site Federal Facility Agreement Page 1 of 8 The U.S. Environmental Protection Agency (EPA) Region 7, the U.S. Department of Energy (DOE), and the Missouri Department of Natural Resources (MDNR) entered into a new Federal Facility Agreement (FFA) for the DOE's Weldon Spring Site near St. Charles, Missouri. EPA made the FFA available for public comment for a period of thirty (30) days beginning April 19, 2006 and ending May 19, 2006. Comments

  4. 2003 Annual Inspection of the Weldon Spring Site

    Office of Legacy Management (LM)

    Office of Legacy Management 2003 Annual Inspection - Weldon Spring, Missouri February 2004 ... Spring, Missouri, Site DOEOffice of Legacy Management 2003 Annual Inspection - Salt ...

  5. State and Tribal Government Working Group Visits the Weldon Spring Site |

    Energy Savers [EERE]

    Department of Energy State and Tribal Government Working Group Visits the Weldon Spring Site State and Tribal Government Working Group Visits the Weldon Spring Site June 1, 2011 - 3:18pm Addthis State and Tribal Government Working Group Visits the Weldon Spring Site State and Tribal Government Working Group Visits the Weldon Spring Site State and Tribal Government Working Group Visits the Weldon Spring Site State and Tribal Government Working Group Visits the Weldon Spring Site What does

  6. Geologic report for the Weldon Spring Raffinate Pits Site

    SciTech Connect (OSTI)

    1984-10-01

    A preliminary geologic site characterization study was conducted at the Weldon Spring Raffinate Pits Site, which is part of the Weldon Spring Site, in St. Charles County, Missouri. The Raffinate Pits Site is under the custody of the Department of Energy (DOE). Surrounding properties, including the Weldon Spring chemical plant, are under the control of the Department of the Army. The study determined the following parameters: site stratigraphy, lithology and general conditions of each stratigraphic unit, and groundwater characteristics and their relation to the geology. These parameters were used to evaluate the potential of the site to adequately store low-level radioactive wastes. The site investigation included trenching, geophysical surveying, borehole drilling and sampling, and installing observation wells and piezometers to monitor groundwater and pore pressures.

  7. A Critique of the August 9th Weldon Spring Site Stewardship Plan...

    Office of Legacy Management (LM)

    ... Remedial Investigation for the Chemical Plant Area of the Weldon Spring Site. Rev. 0. 2 ... for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site. ...

  8. Weldon Spring Site Federal Facility Agreement UNITED STATES ENVIRONMENTAL PROTECTION AGENCY

    Office of Legacy Management (LM)

    Site Federal Facility Agreement UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION VII UNITED STATES DEPARTMENT OF ENERGY MISSOURI DEPARTMENT OF NATURAL RESOURCES IN THE MATTER OF: The United States Department of Energy's Weldon Spring Site, St. Charles, Missouri Docket No. CERCLA-07-2006-0161 FEDERAL FACILITY AGREEMENT FOR THE WELDON SPRING SITE Weldon Spring Site Federal Facility Agreement i TABLE OF CONTENTS I. PRELIMINARY

  9. Weldon Spring Site Environmental Report for Calendar Year 1995

    SciTech Connect (OSTI)

    1996-06-01

    This Weldon Spring Site Environmental Report for Calendar Year 1995 has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project (WSSRAP). The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The chemical plant, raffinate pits, and quarry are located on Missouri State Route 94, southwest of U.S. Route 40/61. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site, estimates of effluent releases, and trends in groundwater contaminant levels. Additionally, applicable compliance requirements, quality assurance programs, and special studies conducted in 1995 to support environmental protection programs are discussed. Dose estimates presented in this report are based on hypothetical exposure scenarios for public use of areas near the site. In addition, release estimates have been calculated on the basis of 1995 National Pollutant Discharge Elimination System (NPDES) and air monitoring data. Effluent discharges from the site under routine NPDES and National Emission Standards for Hazardous Air Pollutants (NESHAPs) monitoring were below permitted levels.

  10. E~ S*D3 Weldon Spring Site Environmental Repon lor Calendar...

    Office of Legacy Management (LM)

    The site consists of two main areas, the former Weldon Spring Chemical Plant and Raffmate Pits area and the Weldon Spring Quarry. The chemical plant and raffmate pits area and the ...

  11. 2003 Annual Inspection of the Weldon Spring, Missouri, Site

    Office of Legacy Management (LM)

    Some erosion areas on the north side of the chemical plant property were observed. The ... of two main areas, the Weldon Spring Chemical Plant and the Weldon Spring Quarry, both ...

  12. Weldon Spring Site environmental report for calendar year 1993. Weldon Springs Site Remedial Action Project

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    This Site Environmental Report for Calendar Year 1993 describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels, and to summarize trends and/or changes in contaminant concentrations from environmental monitoring program. In 1993, the maximum committed dose to a hypothetical individual at the chemical plant site perimeter was 0.03 mrem (0.0003 mSv). The maximum committed dose to a hypothetical individual at the boundary of the Weldon Spring Quarry was 1.9 mrem (0.019 mSv). These scenarios assume an individual walking along the perimeter of the site-once a day at the chemical plant/raffinate pits and twice a day at the quarry-250 days per year. This hypothetical individual also consumes fish, sediment, and water from lakes and other bodies of water in the area. The collective dose, based on an effected population of 112,000 was 0.12 person-rem (0.0012 person-Sv). This calculation is based on recreational use of the August A. Busch Memorial Conservation Area and the Missouri Department of Conservation recreational trail (the Katy Trail) near the quarry. These estimates are below the U.S. Department of Energy requirement of 100 mrem (I mSv) annual committed effective dose equivalent for all exposure pathways. Results from air monitoring for the National Emission Standards for Hazardous Air Pollutants (NESHAPs) program indicated that the estimated dose was 0.38 mrem, which is below the U.S. Environmental Protection Agency (EPA) standard of 10 mrem per year.

  13. Weldon Spring Site Environmental Report for calendar year 1994

    SciTech Connect (OSTI)

    1995-05-01

    This report for Calendar Year 1994 has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project (WSSRAP). The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The chemical plant, raffinate pits, and quarry are located on Missouri State Route 94, southwest of US Route 40/61. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site, estimates of effluent releases, and trends in groundwater contaminant levels. Additionally, applicable compliance requirements, quality assurance programs, and special studies conducted in 1994 to support environmental protection programs are discussed. Dose estimates presented in this report are based on hypothetical exposure scenarios of public use of areas near the site. In addition, release estimates have been calculated on the basis of 1994 National Pollutant Discharge Elimination System (NPDES) and air monitoring data. Effluent discharges from the site under routine NPDES and National Emission Standards for Hazardous Air Pollutants (NESHAPS) monitoring were below permitted levels.

  14. Weldon Spring Site„Connecting lessons from the past with a vision...

    Office of Legacy Management (LM)

    acres of site property to the U.S. Atomic Energy Commission for construction of the Weldon ... St. Peters Weldon Spring O'Fallon Lake St. Louis Chesterfield Downtown St. Louis (35 ...

  15. Radiological survey report for the Weldon Spring Raffinate Pits site, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    Not Available

    1984-08-01

    The Weldon Spring Site (WSS) is a US Department of Energy (DOE) surplus facility comprising the Raffinate Pits facility, the Quarry, and potentially contaminated vicinity properties. Radiological characterization of the WSS will be conducted in three phases: the Raffinate Pits facility, Quarry, and the vicinity properties. Bechtel National, Inc. (BNI) and its radiological support subcontractor, Eberline Instrument Corporation (EIC), conducted a radiological characterization survey of the Raffinate Pits during 1982 and 1983 in support of on-site construction work and a technical evaluation of site geology. The survey consisted of direct beta-gamma surface readings, near-surface gamma readings, exposure level measurements, and gamma-logs of boreholes. Soil samples were also collected from the surface, shallow boreholes, and trenches on the site. This report describes the radiological characterization of the Raffinate Pits facility, the procedures used to conduct the survey, the survey results, and their significance. 5 references, 9 figures, 8 tables.

  16. DOE - Office of Legacy Management -- Weldon Spring Chemical Co...

    Office of Legacy Management (LM)

    Weldon Spring Chemical Co - MO 03 FUSRAP Considered Sites Site: Weldon Spring Chemical Co. (MO.03) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site ...

  17. Weldon Spring Site environmental report for calendar year 1997

    SciTech Connect (OSTI)

    1998-08-01

    This report describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels and regulations, and to summarize trends and/or changes in contaminant concentrations identified through environmental monitoring. Comprehensive monitoring indicated that emissions of radiological compounds in airborne and surface water discharges from the Weldon Spring site consisted primarily of Rn-220 gas, isotopes of thorium and radium, and natural uranium. Airborne Rn-220 emissions were estimated to be 42 Ci (1.6E12 Bq), while emissions from a combination of thorium, radium, and natural uranium isotopes to air and surface water were estimated to be 0.018 Ci (6.7E8 Bq), for a total of 25,000 g (25 kg). There was no measurable impact to any drinking water source.

  18. Feasibility study for remedial action for the Quarry Residuals Operable Unit at the Weldon Spring Site, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    1998-03-01

    The U.S. Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, which is located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis (Figure 1.1). Cleanup of the Weldon Spring site consists of several integrated components. The quarry residuals operable unit (QROU) is one of four operable units being evaluated. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, a remedial investigation/feasibility study (RI/FS) is being conducted to evaluate conditions and potential responses for the following areas and/or media that constitute the QROU: (1) the residual material (soil and sediment) remaining at the Weldon Spring quarry after removal of the bulk waste (about 11 million L [3 million gal] of uranium-contaminated ponded water was also addressed previous to bulk waste removal); (2) other media located in the surrounding vicinity of the quarry, including adjacent soil, surface water, and sediment in Femme Osage Slough and several creeks; and (3) quarry groundwater located primarily north of Femme Osage Slough. Potential impacts to the St. Charles County well field downgradient of the quarry area are also being addressed as part of QROU RI/FS evaluations. For remedial action sites, it is DOE policy to integrate values associated with the National Environmental Policy Act (NEPA) into the CERCLA decision-making process. The analyses contained herein address NEPA values as appropriate to the actions being considered for the QROU. A work plan summarizing initial site conditions and providing conceptual site hydrogeological and exposure models was published in January 1994. The RI and baseline risk assessment (BRA) reports have been completed. The RI discusses in detail the nature and extent and the fate and transport of contamination at the quarry area.

  19. Evaluation of surface water treatment and discharge options for the Weldon Spring Site Remedial Action Project

    SciTech Connect (OSTI)

    Goyette, M.L.; MacDonell, M.M.

    1992-09-01

    The US Department of Energy (DOE), under its Environmental Restoration and Waste Management Program, is responsible for conducting response actions at the Weldon Spring site in St. Charles County, Missouri. The site consists of two noncontiguous areas: (1) the chemical plant area, which includes four raffinate pits and two small ponds, and (2) a 3.6-ha (9-acre) quarry located about 6.4 km (4 mi) southwest of the chemical plant area. Both of these areas became chemically and radioactively contaminated as a result of processing and disposal activities that took place from the 1940s through 1960s. The Weldon Spring site, located about 48 km (30 mi) west of St. Louis, is listed on the National Priorities List of the US Environmental Protection Agency. Nitroaromatic explosives were processed by the Army at the chemical plant area during the 1940s, and radioactive materials were processed by DOE`s predecessor agency (the Atomic Energy Commission) during the 1950s and 1960s. Overall remediation of the Weldon Spring site is being addressed through the Weldon Spring Site Remedial Action Project, and it consists of several components. One component is the management of radioactively and chemically contaminated surface water impoundments at the chemical plant area -- i.e., the four raffinate pits, Frog Pond, and Ash Pond which was addressed under a separate action and documented in an engineering evaluation/cost analysis report. This report discusses the evaluation of surface water treatment at the Weldon Spring site.

  20. Environmental Response to Remedial Actions at the Weldon Spring Site--An Environmental Success Story

    SciTech Connect (OSTI)

    Meier, J. A.; Welton, T. D.

    2002-02-27

    Environmental remediation activities have been ongoing at the Weldon Spring Site for over a decade, beginning with small interim response actions and culminating in completion of surface cleanup as represented by closure of the 17 hectare (42-acre) on-site disposal cell. As remedial actions have incrementally been accomplished, the occurrence of site-related contaminants in on and off-site environmental media have effectively been reduced. The DOE-WSSRAP has demonstrated success through the effective reduction or elimination of site related water and airborne contaminants along multiple migration pathways. This paper briefly describes the remedial measures affected at Weldon Spring, and quantifies the environmental responses to those remedial measures.

  1. Engineering evaluation/cost analysis for the proposed management of 15 nonprocess buildings (15 series) at the Weldon Spring Site Chemical Plant, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    MacDonell, M M; Peterson, J M

    1989-05-01

    The US Department of Energy, under its Surplus Facilities Management Program (SFMP), is responsible for cleanup activities at the Weldon-Spring site, located near Weldon Spring, Missouri. The site consists of two noncontiguous areas: (1) a raffinate pits and chemical plant area and (2) a quarry. This engineering evaluation/cost analysis (EE/CA) report has been prepared to support a proposed removal action to manage 15 nonprocess buildings, identified as the 15 Series buildings, at the chemical plant on the Weldon Spring site. These buildings have been nonoperational for more than 20 years, and the deterioration that has occurred during this time has resulted in a potential threat to site workers, the general public, and the environment. The EE/CA documentation of this proposed action is consistent with guidance from the US Environmental Protection Agency (EPA) that addresses removal actions at sites subject to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986. Actions at the Weldon Spring site are subject to CERCLA requirements because the site is on the EPA`s National Priorities List. The objectives of this report are to (1) identify alternatives for management of the nonprocess buildings; (2) document the selection of response activities that will mitigate the potential threat to workers, the public, and the environment associated with these buildings; and (3) address environmental impacts associated with the proposed action.

  2. Aquifer Characteristics Data Report for the Weldon Spring Site chemical plant/raffinate pits and vicinity properties for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    Not Available

    1990-11-01

    This report describes the procedures and methods used, and presents the results of physical testing performed, to characterize the hydraulic properties of the shallow Mississippian-Devonian aquifer beneath the Weldon Spring chemical plant, raffinate pits, and vicinity properties. The aquifer of concern is composed of saturated rocks of the Burlington-Keokuk Limestone which constitutes the upper portion of the Mississippian-Devonian aquifer. This aquifer is a heterogeneous anisotropic medium which can be described in terms of diffuse Darcian flow overlain by high porosity discrete flow zones and conduits. Average hydraulic conductivity for all wells tested is 9.6E-02 meters/day (3.1E-01 feet/day). High hydraulic conductivity values are representative of discrete flow in the fractured and weathered zones in the upper Burlington-Keokuk Limestone. They indicate heterogeneities within the Mississippian-Devonian aquifer. Aquifer heterogeneity in the horizontal plane is believed to be randomly distributed and is a function of fracture spacing, solution voids, and preglacial weathering phenomena. Relatively high hydraulic conductivities in deeper portions of the aquifer are though to be due to the presence of widely spaced fractures. 44 refs., 27 figs., 9 tabs.

  3. Analysis of potential groundwater contamination in the vicinity of the Weldon Spring Raffinate Pits site, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    Tsai, S.Y.; Peterson, J.M.; Winters, M.C.B.

    1984-08-01

    Results of the analysis of contaminant migration beneath the raffinate pits at the Weldon Spring Raffinate Pits site indicate that during a 10,000-year time period, the maximum concentrations in the water immediately beneath the pit bottoms would be about 4600 pCi/L of radium-226 (Pit 3) and about 12,000 pCi/L of uranium-238 (Pit 1); these concentrations would occur at the centers of the pit bottoms. Based on the assumptions used in this study, the radioactive contaminants in the pits would migrate no more than 2 m (7 ft) below the pit bottoms. Because 6 to 12 m (20 to 40 ft) of silty clays underlie the raffinate pits, the radioactive contaminants would take several tens of thousands of years to reach nearby groundwater supplies. Although the results of these analyses indicate that a high degree of confinement is provided by the four raffinate pits, it should be noted that the validity of such analyses rests on the quality of the parameter values utilized. Due to a lack of current site-specific data for some physical parameters, it has been necessary to use historical and regional data for these values. The values cited are at times inconsistent and contradictory, e.g., the wide range of values indicated for the permeability of clays underlying the pits. However, these were the only data available. The analysis reported herein indicates that within the limitations of the available data, use of the Raffinate Pits site for long-term management of radioactive materials such as those currently being stored in the four pits appears to be feasible. 24 references, 14 figures, 7 tables.

  4. Weldon spring site environmental report for calendar year 1996. Revision 0

    SciTech Connect (OSTI)

    1997-07-23

    This Site Environmental Report for Calendar Year 1996 describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels and regulations, and to summarize trends and/or changes in contaminant concentrations identified through environmental monitoring.

  5. Streamlined RI/FS planning for the groundwater operable unit at the Weldon Spring Site

    SciTech Connect (OSTI)

    Picel, M.H.; Durham, L.A.; Blunt, D.L.; Hartmann, H.M.

    1995-12-31

    The U.S. Department of Energy (DOE) is conducting cleanup activities at the chemical plant area of the Weldon Spring Site located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis and 22 km (14 mi) southwest of the City of St. Charles. The 88-ha (217-acre) chemical plant area is chemically and radioactively contaminated as a result of uranium processing activities conducted by the U.S. Atomic Energy Commission during the 1950s and 1960s. The Army also used the chemical plant area for the production of explosives in the 1940s. The Weldon Spring Site chemical plant area was listed on the National Priorities List (NPL) in 1989. Adjacent to the chemical plant area is another NPL site known as the Weldon Spring Ordnance Works. The ordnance works area is a former explosive production facility that manufactured trinitrotoluene (TNT) and dinitrotoluene (DNT) during World War II. The ordnance works area covers 7,000 ha (17,232 acres); cleanup of this site is managed by the U.S. Army Corps of Engineers (CE).

  6. Biological assessment for the remedial action at the chemical plant area of the Weldon Spring site

    SciTech Connect (OSTI)

    Hlohowskyj, I.; Dunn, C.P.

    1992-11-01

    The Weldon Spring site in St.Charles County, Missouri, became contaminated during the 1940s through the 1960s as a result of explosives production by the US Army and uranium and thorium processing by the predecessor agency of the US Department of Energy (DOE). The site is listed on the National Priorities List of the US Environmental Protection Agency, and DOE is responsible for its cleanup. Contaminants are present in soil, surface water, and aquatic sediments. Alternatives identified for site remediation are no action (included as baseline for comparison), treatment and disposal of the wastes at the Weldon Spring site, and on-site treatment followed by off-site disposal at either a commercial facility near Clive, Utah, or at DOE`s Hanford site near Richland, Washington. In accordance with the requirements of the Endangered Species Act, this biological assessment has been prepared to evaluate the potential effects of proposed remedial action alternatives on federal listed (endangered or threatened) and candidate species at the respective sites. The assessment includes consideration of the environmental setting at each site; the federal listed and candidate species that could occur at each site; the construction, excavation, and treatment activities under each alternative; and the amount of land area affected at each site.

  7. Biological assessment for the remedial action at the chemical plant area of the Weldon Spring site

    SciTech Connect (OSTI)

    Hlohowskyj, I.; Dunn, C.P.

    1992-11-01

    The Weldon Spring site in St.Charles County, Missouri, became contaminated during the 1940s through the 1960s as a result of explosives production by the US Army and uranium and thorium processing by the predecessor agency of the US Department of Energy (DOE). The site is listed on the National Priorities List of the US Environmental Protection Agency, and DOE is responsible for its cleanup. Contaminants are present in soil, surface water, and aquatic sediments. Alternatives identified for site remediation are no action (included as baseline for comparison), treatment and disposal of the wastes at the Weldon Spring site, and on-site treatment followed by off-site disposal at either a commercial facility near Clive, Utah, or at DOE's Hanford site near Richland, Washington. In accordance with the requirements of the Endangered Species Act, this biological assessment has been prepared to evaluate the potential effects of proposed remedial action alternatives on federal listed (endangered or threatened) and candidate species at the respective sites. The assessment includes consideration of the environmental setting at each site; the federal listed and candidate species that could occur at each site; the construction, excavation, and treatment activities under each alternative; and the amount of land area affected at each site.

  8. Science and Nature Adventure Program Series, June 7–10, at the Weldon Spring Site

    Broader source: Energy.gov [DOE]

    St. Charles, MO – What will inspire our next generation of scientists, artists, engineers, and biologists? What will fuel their curiosity to create, solve problems, and study? The Weldon Spring...

  9. Weldon Spring Site Reaches New Milestones | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Audiences and visitors to the site have come to depend on interpretive opportunities to supplement school curriculum and to learn about the site's history, remediation, ...

  10. Weldon Spring Site Environmental Report For Calendar Year 2001

    SciTech Connect (OSTI)

    none,

    2002-07-01

    This annual report presents a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. This report also presents the status of remedial activities and the results of monitoring activities to assess their impacts on the public and environment.

  11. WELDON SPRING SITE ENVIRONMENTAL REPORT FOR CALENDAR YEAR 2002

    SciTech Connect (OSTI)

    WASHINGTON GROUP INTERNATIONAL AND JACOBS ENGINEERING GROUP

    2003-05-01

    This annual report presents a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. This report also presents the status of remedial activities and the results of monitoring activities to assess their impacts on the public and environment.

  12. Geochemical information for sites contaminated with low-level radioactive wastes. III. Weldon Spring Storage Site

    SciTech Connect (OSTI)

    Seeley, F.G.; Kelmers, A.D.

    1985-02-01

    The Weldon Spring Storage Site (WSSS), which includes both the chemical site and the quarry, became radioactively contaminated as the result of wastes that were being stored from operations to recover uranium from pitchblende ores in the 1940s and 1950s. The US Department of Energy (DOE) is considering various remedial action options for the WSSS. This report describes the results of geochemical investigations carried out at Oak Ridge National Laboratory (ORNL) to support these activities and to help quantify various remedial action options. Soil and groundwater samples were characterized, and uranium and radium sorption ratios were measured in site soil/groundwater systems by batch contact methodology. Soil samples from various locations around the raffinate pits were found to contain major amounts of silica, along with illite as the primary clay constituent. Particle sizes of the five soil samples were variable (50% distribution point ranging from 12 to 81 ..mu..m); the surface areas varied from 13 to 62 m/sup 2//g. Elemental analysis of the samples showed them to be typical of sandy clay and silty clay soils. Groundwater samples included solution from Pit 3 and well water from Well D. Anion analyses showed significant concentrations of sulfate and nitrate (>350 and >7000 mg/L, respectively) in the solution from Pit 3. These anions were also present in the well water, but in lower concentrations. Uranium sorption ratios for four of the soil samples contacted with the solution from Pit 3 were moderate to high (approx. 300 to approx. 1000 mL/g). The fifth sample had a ratio of only 12 mL/g. Radium sorption ratios for the five samples were moderate to high (approx. 600 to approx. 1000 mL/g). These values indicate that soil at the WSSS may show favorable retardation of uranium and radium in the groundwater. 13 references, 13 figures, 10 tables.

  13. Maintenance at DOE Legacy Management Sites Weldon Spring Site LTS&M Plan U.S. Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Developing and Implementing Institutional Controls for Long-Term Surveillance and Maintenance at DOE Legacy Management Sites Weldon Spring Site LTS&M Plan U.S. Department of Energy Doc. No. S00790-1.0 December 2008 Page 2-22 Figure 2-4. MNA Groundwater Monitoring Locations January 2015 DOE/LM-1414 Guidance for Developing and Implementing Institutional Controls for Long-Term Surveillance and Maintenance at DOE Legacy Management Sites January 2015 The most recent and official controlled hard

  14. The Use of Ecological Restoration Principles To Achieve Remedy Protection At the Fernald Preserve and Weldon Spring Sites

    SciTech Connect (OSTI)

    Powell, J.; Johnston, F.; Homer, J.; Deyo, Y.

    2008-07-01

    At both the Fernald Preserve and the Weldon Spring Site, the development of ecological restoration goals and objectives was used to complement and even enhance achievement of selected remedies. Warm-season native grasses and forbs were used for revegetation of remediated areas. The hardiness and ability to establish in low-nutrient conditions make native grasses ideal candidates for reestablishment of vegetation in excavated areas. At the Fernald Preserve, native grasses were used for vegetative cover on an on-site disposal facility as well. Also at the Fernald Preserve, excavation footprints were optimized to increase the quantity and quality of created wetlands. Drainage features in a couple instances provide passive groundwater recharge, potentially accelerating groundwater remediation efforts. In addition, a number of clean materials and structures were beneficially reused as part of ecological restoration designs, including wood-chip mulch and woody debris, clean concrete, and a rail trestle. At the Weldon Spring Site, several methods were used to control erosion for three years after the initial seeding of native species. A field evaluation of soil conditions and general species diversity was performed in 2007 and it was determined that erosion at the site was typical and repairing naturally. These approaches resulted in 'win-win' strategies needed to successfully remediate and restore complex projects such as the Fernald Preserve and Weldon Spring. (authors)

  15. Work plan for the remedial investigation/feasibility study-environmental assessment for the quarry residuals operable unit at the Weldon Spring Site

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    The US Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, which is located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis. The Weldon Spring site consists of two noncontiguous areas -- the chemical plant area, which includes four raffinate pits, and the quarry. Cleanup activities at the Weldon Spring site are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, incorporating the values of the National Environmental Policy Act (NEPA). The contents of the documents prepared for the project are not intended to represent a statement regarding the legal applicability of NEPA to remedial actions conducted under CERCLA. In accordance with the integrated CERCLA/NEPA approach, a remedial investigation/feasibility study-environmental assessment (RI/FS-EA) is being conducted to evaluate conditions and potential responses for the quarry residuals operable unit (QROU). This operable unit consists of the following areas and/or media: the residual material remaining at the Weldon Spring quarry after removal of the pond water and bulk waste; underlying groundwater; and other media located in the surrounding vicinity of the quarry, including adjacent soil, surface water, and sediment in Femme Osage Slough. This work plan identifies the activities within the RI/FS-EA process that are being proposed to address contamination remaining at the quarry area.

  16. Weldon Spring historical dose estimate

    SciTech Connect (OSTI)

    Meshkov, N.; Benioff, P.; Wang, J.; Yuan, Y.

    1986-07-01

    This study was conducted to determine the estimated radiation doses that individuals in five nearby population groups and the general population in the surrounding area may have received as a consequence of activities at a uranium processing plant in Weldon Spring, Missouri. The study is retrospective and encompasses plant operations (1957-1966), cleanup (1967-1969), and maintenance (1969-1982). The dose estimates for members of the nearby population groups are as follows. Of the three periods considered, the largest doses to the general population in the surrounding area would have occurred during the plant operations period (1957-1966). Dose estimates for the cleanup (1967-1969) and maintenance (1969-1982) periods are negligible in comparison. Based on the monitoring data, if there was a person residing continually in a dwelling 1.2 km (0.75 mi) north of the plant, this person is estimated to have received an average of about 96 mrem/yr (ranging from 50 to 160 mrem/yr) above background during plant operations, whereas the dose to a nearby resident during later years is estimated to have been about 0.4 mrem/yr during cleanup and about 0.2 mrem/yr during the maintenance period. These values may be compared with the background dose in Missouri of 120 mrem/yr.

  17. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17--21, 1997

    SciTech Connect (OSTI)

    1998-01-28

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team`s findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ``US Department of Energy Voluntary Protection Program, Part 1: Program Elements`` to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA`s VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status.

  18. DOE/GJ/79491-944 CONTRACT NO. DE-ACO1-02GJ79491 WELDON SPRING...

    Office of Legacy Management (LM)

    The site consists of two main areas, the former Weldon Spring Chemical Plant and the ... Evaluation of groundwater remedies at the Chemical Plant Area Groundwater Operable Unit. ...

  19. Supplemental feasibility study for remedial action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    1999-08-06

    Site data evaluated indicate that after source removal, dilution and dispersion appear to be the primary processes that would further attenuate groundwater contaminant concentrations. On the basis of these attenuation processes, the calculations presented in Chapter 2 indicate that it would take several years to decades (approximately 60 to 150 and 14 years, respectively, for Zones 1 and 2) for TCE concentrations in Zones 1 and 2 to attenuate to the MCL (or ARAR) of 5 pg/L. The estimates for Zones 1 through 3, where the higher nitrate concentrations are clustered, indicate that it would likely take at least 80 years for nitrate concentrations to attenuate to the MCL (or ARAR) of 10 mg/L. Costs for implementing NINA for groundwater at the chemical plant area are primarily associated with those incurred for monitoring contaminant concentrations and the replacement costs for monitoring wells. Cost estimates are relatively high because a rather lengthy period of monitoring would be involved. Calculations performed to evaluate the feasibility of groundwater removal and subsequent treatment of the extracted water included determinations for the number of extraction wells needed, required number of pore volumes, and the number of years of implementation required to attain bench marks. The calculations were performed per zone of contamination, as discussed in Chapter 1. Several observations can be made about the results presented in Chapter 3 regarding Alternative 4. The first is that by looking at the results for Zones 1 and 2 evaluated under Alternative 4, one can also assess the feasibility of Alternative 7, because Alternative 7 addresses this particular subset of Alternative 4 (i.e., Zones 1 and 2). TCE contamination has been observed in Zones 1 and 2, but has not been reported in any of the remaining five zones. Nitrate, nitroaromatic compounds, and uranium have also been reported in Zones 1 and 2. The present-worth costs for implementing the pump and treat alternative in Zones 1 and 2 constitute the major component of the overall present-worth cost for Alternative 4, which indicates that the cost for Alternative 7 would be similarly high. Another observation is that although estimated times are shorter for the pump and treat approach than those for MNA, pump and treat for Zones 1 and 2 likely would take several decades (at least 30 years) to attain ARARs or bench marks. The cost estimates (in present-worth costs) for Alternatives 4 and 7 are much higher (approximately an order of magnitude higher) than those for Alternative 3.

  20. Weldon Spring, Missouri, Long-Term Stewardship Plan Public Workshop Notes, August 28, 2002

    Office of Legacy Management (LM)

    W W e e l l d d o o n n S S p p r r i i n n g g L L o o n n g g - - T T e e r r m m S S t t e e w w a a r r d d s s h h i i p p P P l l a a n n P P u u b b l l i i c c W W o o r r k k s s h h o o p p N N o o t t e e s s A A u u g g u u s s t t 2 2 8 8 , , 2 2 0 0 0 0 2 2 Opening Pam Thompson, U.S. Department of Energy (DOE) Weldon Spring Site Remedial Action Project Manager made opening comments, welcomed everyone, and introduced members of the DOE, Weldon Spring Citizens Commission, and others

  1. DOE - Office of Legacy Management -- Weldon

    Office of Legacy Management (LM)

    The Weldon Spring Site was transferred to the Office of Legacy Management (LM) in 2003. LM conducts long-term surveillance and maintenance at the site which includes routine ...

  2. DOE - Office of Legacy Management -- Weldon

    Office of Legacy Management (LM)

    Missouri Weldon Spring, Missouri, Site Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheets EPA Response to Comments and FFA Finalization Federal Facility Agreement Fourth Five-Year Review Long-Term Surveillance and Maintenance Plan - December 2008 Site History Weldon Spring Site Annual Report for Calendar Year 2014 Please be green. Do not print these documents unless absolutely necessary. Submit a FOIA Request for documents not available through this

  3. Quarry Bulk Waste Removal, Weldon Spring Site.

    Office of Legacy Management (LM)

  4. Summary of Weldon Spring Site Focus Area

    Office of Legacy Management (LM)

    S.M. Stoller, the U.S. Department of Energy (DOE) Grand Junction Office (GJO) ... Charles County government offices as appropriate. - Interpretive Center annual usage summary ...

  5. Superfund record of decision (EPA Region 7): Weldon Spring Quarry/Plant/Pits (USDOE), St. Charles, MO, September 30, 1998

    SciTech Connect (OSTI)

    1999-03-01

    The Weldon Spring Quarry is one of two noncontiguous areas that constitute the US Department of Energy`s (DOE) Weldon Spring site. The main area of the site is the chemical plant. Both areas are located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis. The US Environmental Protection Agency (EPA) listed the quarry on the National Priorities List (NPL) in 1987, and the chemical plant area was added to the list in 1989. The quarry is about 6.4 km (4 mi) south-southwest of the chemical plant area; it is accessible from State Route 94 and is currently fenced and closed to the public. The quarry is approximately 300 m (1,000 ft) long by 140 m (450 ft) wide and covers an area of approximately 3.6 ha (9 acres). The quarry was used by the Army for disposal of chemically contaminated (explosive) materials in the 1940s and was later used for the disposal of radioactively contaminated material by the Atomic Energy Commission (AEC) in the 1960s. Approximately 110,000 m{sup 3} (144,000 yd{sup 3}) of soil and waste material was removed from the quarry and transported to the chemical plant area as part of completing the remedial action stipulated in the Record of Decision (ROD) for the Quarry Bulk Waste Operable Unit (DOE 1990). Bulk waste removal was completed in October 1995. These wastes have been placed in the disposal cell at the chemical plant. Prior to bulk waste removal, contaminated water contained in the quarry pond was also removed; approximately 170 million liters (44 million gal) have been treated as of March 1998.

  6. DOE - Office of Legacy Management -- LM Sites Map

    Office of Legacy Management (LM)

    Tonawanda North Sites Tuba City Disposal Site Vallecitos Nuclear Center Site Wayne Site Weldon Spring Site Sites Pending Transfer to Legacy Management . Last Updated: 1142016

  7. Weldon Spring Federal Facility Agreement, January 28, 1992 Summary

    Office of Environmental Management (EM)

    US EPA; US DOE Date 12892 SCOPE * Investigate the environmental impacts of past and present activities at the Site on the public health, welfare and the environment. * Establish...

  8. Weldon Spring, Missouri: Annual environmental monitoring report, calendar year 1987

    SciTech Connect (OSTI)

    Not Available

    1987-01-01

    Radiological monitoring at the WSS during 1987 measured uranium, Radium-226, and Thorium-230 concentrations in surface water, groundwater, and sediment; radon gas concentrations in air; all long-lived natural series isotopes in air particulates; and external gamma radiation exposure rates. Potential radiation doses to the public were calculated based on assumed exposure periods and the above measurements. Radon concentrations, external gamma exposure rates, and radionuclide concentrations in groundwater and surface water at the site were generally equivalent to previous years' levels. The maximum calculated annual radiation dose to a hypothetically exposed individual at the WSRP and WSCP area was 1 mrem, or 1 percent of the DOE radiation protection standard of 100 mrem. The maximum calculated annual radiation dose to a hypothetically exposed individual at the WSQ was 14 mrem, or about 14 percent of the standard. Thus the WSS currently complies with DOE Off-site Dose Standards. Chemical contamination monitoring at the WSS during 1987 measured nitroaromatics, total organic carbon and the inorganic anions chloride, nitrate, fluoride and sulfate in surface water, groundwater and sediment. 22 refs., 26 figs., 21 tabs.

  9. DOE - Office of Legacy Management -- Weldon Fact Sheets

    Office of Legacy Management (LM)

    Missouri > Weldon Fact Sheets Weldon Spring, Missouri, Fact Sheets Timeline PDF Air and Water Monitoring PDF Borrow Area PDF Disposal Facility (Cell) PDF Fundamentals of Radiation ...

  10. Feasibility study for remedial action for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    1999-07-15

    The U.S. Department of Energy (DOE) and the U.S. Department of Army (DA) are conducting an evaluation to identify the appropriate response action to address groundwater contamination at the Weldon Spring Chemical Plant (WSCP) and the Weldon Spring Ordnance Works (WSOW), respectively. The two areas are located in St. Charles County, about 48 km (30 rni) west of St. Louis. The groundwater operable unit (GWOU) at the WSCP is one of four operable units being evaluated by DOE as part of the Weldon Spring Site Remedial Action Project (WSSRAP). The groundwater operable unit at the WSOW is being evaluated by the DA as Operable Unit 2 (OU2); soil and pipeline contamination are being managed under Operable Unit 1 (OU1). Remedial activities at the WSCP and the WSOW are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. A remedial investigation/feasibility study (RI/FS) work plan summarizing initial site conditions and providing site hydrogeological and exposure models was published in August of 1995 (DOE 1995). The remedial investigation (RI) and baseline risk assessment (BRA) have also recently been completed. The RI (DOE and DA 1998b) discusses in detail the nature, extent, fate, and transport of groundwater and spring water contamination. The BRA (DOE and DA 1998a) is a combined baseline assessment of potential human health and ecological impacts and provides the estimated potential health risks and ecological impacts associated with groundwater and springwater contamination if no remedial action were taken. This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP and the WSOW. A brief description of the history and environmental setting of the sites is presented in Section 1.1, key information relative to the nature and extent of contamination is presented in Section 1.2, and the results of the BRA are summarized in Section 1.3. The objective of this FS is discussed in Section 1.4, and preliminary remediation goals are identified in Section 1.5. The organization of the remaining chapters of this FS is outlined in Section 1.6.

  11. Recycling Building Foundation at the Weldon Spring, Missouri, Site |

    Energy Savers [EERE]

    Recent Publications Recent Publications The following list of recent publications from the Advanced Manufacturing Office (AMO) reflects the broad scope of AMO's activities. The publications cover both the ongoing support for innovation through research and development of new products and processes and the technical assistance to improve energy efficiency in manufacturing. June 19, 2015 Barriers to Industrial Energy Efficiency - Report to Congress, June 2015 This report examines barriers that

  12. Publication: Weldon Spring Site Remedial Action Plan (WSSRAP) Update

    Office of Legacy Management (LM)

  13. Publication: Weldon Spring Site Remedial Action Plan (WSSRAP) Update.

    Office of Legacy Management (LM)

  14. Publication: Weldon Spring Site Remedial Action Plan (WSSRAP) Update.

    Office of Legacy Management (LM)

  15. Ground-water flow and ground- and surface-water interaction at the Weldon Spring quarry, St. Charles County, Missouri

    SciTech Connect (OSTI)

    Imes, J.L.; Kleeschulte, M.J.

    1997-12-31

    Ground-water-level measurements to support remedial actions were made in 37 piezometers and 19 monitoring wells during a 19-month period to assess the potential for ground-water flow from an abandoned quarry to the nearby St. Charles County well field, which withdraws water from the base of the alluvial aquifer. From 1957 to 1966, low-level radioactive waste products from the Weldon Spring chemical plant were placed in the quarry a few hundred feet north of the Missouri River alluvial plain. Uranium-based contaminants subsequently were detected in alluvial ground water south of the quarry. During all but flood conditions, lateral ground-water flow in the bedrock from the quarry, as interpreted from water-table maps, generally is southwest toward Little Femme Osage Creek or south into the alluvial aquifer. After entering the alluvial aquifer, the ground water flows southeast to east toward a ground-water depression presumably produced by pumping at the St. Charles County well field. The depression position varies depending on the Missouri River stage and probably the number and location of active wells in the St. Charles County well field.

  16. Baseline risk assessment for groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    1999-07-14

    The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are evaluating conditions in groundwater and springs at the DOE chemical plant area and the DA ordnance works area near Weldon Spring, Missouri. The two areas are located in St. Charles County, about 48 km (30 mi) west of St. Louis. The 88-ha (217-acre) chemical plant area is chemically and radioactively contaminated as a result of uranium-processing activities conducted by the U.S. Atomic Energy Commission in the 1950s and 1960s and explosives-production activities conducted by the U.S. Army (Army) in the 1940s. The 6,974-ha (17,232-acre) ordnance works area is primarily chemically contaminated as a result of trinitrotoluene (TNT) and dinitrotoluene (DNT) manufacturing activities during World War II. This baseline risk assessment (BRA) is being conducted as part of the remedial investigation/feasibility study (RUFS) required under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended. The purpose of the BRA is to evaluate potential human health and ecological impacts from contamination associated with the groundwater operable units (GWOUs) of the chemical plant area and ordnance works area. An RI/FS work plan issued jointly in 1995 by the DOE and DA (DOE 1995) analyzed existing conditions at the GWOUs. The work plan included a conceptual hydrogeological model based on data available when the report was prepared; this model indicated that the aquifer of concern is common to both areas. Hence, to optimize further data collection and interpretation efforts, the DOE and DA have decided to conduct a joint RI/BRA. Characterization data obtained from the chemical plant area wells indicate that uranium is present at levels slightly higher than background, with a few concentrations exceeding the proposed U.S. Environmental Protection Agency (EPA) maximum contaminant level (MCL) of 20 {micro}g/L (EPA 1996c). Concentrations of other radionuclides (e.g., radium and thorium) were measured at back-ground levels and were eliminated from further consideration. Chemical contaminants identified in wells at the chemical plant area and ordnance works area include nitroaromatic compounds, metals, and inorganic anions. Trichloroethylene (TCE) and 1,2-dichloroethylene (1,2 -DCE) have been detected recently in a few wells near the raffinate pits at the chemical plant.

  17. EM's Cleanup Mission: 16 Sites in 11 States Remaining

    Broader source: Energy.gov [DOE]

    At the end of fiscal year 2013, EM completed cleanup and closed 90 sites in 28 states. This included cleanup and closure of 85 smaller sites and five major nuclear sites: Rocky Flats, Fernald, Mound, Pinellas, and Weldon Spring.

  18. Weldon Spring Quarry Cleanup.

    Office of Legacy Management (LM)

  19. Remedial investigation concept plan for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    1999-07-15

    The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are conducting cleanup activities at two properties--the DOE chemical plant area and the DA ordnance works area (the latter includes the training area)--located in the Weldon Spring area in St. Charles County, Missouri. These areas are on the National Priorities List (NPL), and cleanup activities at both areas are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE and DA are conducting a joint remedial investigation (RI) and baseline risk assessment (BRA) as part of the remedial investigation/feasibility study (RI/FS) for the groundwater operable units for the two areas. This joint effort will optimize further data collection and interpretation efforts and facilitate overall remedial decision making since the aquifer of concern is common to both areas. A Work Plan issued jointly in 1995 by DOE and the DA discusses the results of investigations completed at the time of preparation of the report. The investigations were necessary to provide an understanding of the groundwater system beneath the chemical plant area and the ordnance works area. The Work Plan also identifies additional data requirements for verification of the evaluation presented.

  20. Letter and Assessment: Data Quality Assessment in Support of the Risk Assessment for the Southeast Drainage Near the Weldon Spring Site, Weldon Spring, Missouri.

    Office of Legacy Management (LM)

  1. Letter: Engineering Evaluation/Cost Analysis (EE/CA) for the Proposed Removal Action at the Southeast Drainage Near the Weldon Spring Site, Weldon Spring, Missouri.

    Office of Legacy Management (LM)

  2. Remedial Investigation for the Quarry Residuals Operable Unit of the Weldon Spring Site, Weldon Spring, Missouri, Volume 2 Appendices. DOE/OR/21548-587

    Office of Legacy Management (LM)

  3. Remediation Assessment: Floodplain/Wetlands Assessment for the Remediation of the Southeast Drainage Near the Weldon Spring Site, Weldon Spring, Missouri.

    Office of Legacy Management (LM)

  4. Sampling Plan: Sampling Plan for the Feasibility Study for the Quarry Residuals Operable Unit at the Weldon Spring Site, Weldon Spring, Missouri. DOE/OR/21548-699.

    Office of Legacy Management (LM)

  5. Data Assessment and Letter: Data Quality Assessment in Support of the Risk Assessment for the Southeast Drainage Near the Weldon Spring Site, Weldon Spring, Missouri.

    Office of Legacy Management (LM)

  6. Feasibility Study: Feasibility Study for Remedial Action for the Quarry Residuals Operable Unit at the Weldon Spring Site, Weldon Spring, Missouri. DOE/OR/21548-595.

    Office of Legacy Management (LM)

  7. Letter: Cultural Resources Evaluations of the Weldon Spring Site Remedial Action Project (WSSRAP) Southeast Drainage.

    Office of Legacy Management (LM)

  8. Letter: Weldon Spring Site Remedial Action Program (WSSRAP) Cleanup Notification. QY-100-101-1.02.

    Office of Legacy Management (LM)

  9. Letter: Weldon Spring Site Remedial Action Project, Southeast Drainage, Saint Charles County, Missouri.

    Office of Legacy Management (LM)

  10. Proposed Interim Response Action, Construction of Ash Pond Isolation System at the Weldon Spring Site.

    Office of Legacy Management (LM)

  11. Public Forum: Weldon Spring Site Public Forum. IR-1600-1604-1.01.

    Office of Legacy Management (LM)

  12. Public Information Meeting Weldon Spring Site. I-1600-1603-1.08.

    Office of Legacy Management (LM)

  13. Public Information Meeting on Weldon Spring Site Remedial Action Project. I-1600-1603-1.17

    Office of Legacy Management (LM)

  14. Public Information meeting for Weldon Spring Site. I-1600-1603-1.10.

    Office of Legacy Management (LM)

  15. Radiological and Chemical Uptake in Game Species at the Weldon Spring Site, July 1995, Rev. 1.

    Office of Legacy Management (LM)

  16. Remedial Action Work Plan for the Chemical Plant Area of the Weldon Spring Site

    Office of Legacy Management (LM)

  17. Review of Risk Assessment for Weldon Spring Quarry Site, Saint Charles, Missouri.

    Office of Legacy Management (LM)

  18. Transcript of Proceedings: Quarry Waste Removal Proposed Plan Weldon Spring Site Remedial Action Projec

    Office of Legacy Management (LM)

  19. Weldon Spring SIte Remedial Action Project Update, Responding to the Community.

    Office of Legacy Management (LM)

  20. Description of Proposed Interim Remedial Action at the Weldon Spring Site.

    Office of Legacy Management (LM)

  1. Weldon Spring Quarry Waste Removal.

    Office of Legacy Management (LM)

  2. Weldon Spring Quarry Waste Removal.

    Office of Legacy Management (LM)

  3. CERCLA - Site Selector

    Office of Legacy Management (LM)

    Management About Legacy Management News Request Information photo_header OLM_bannerblue CERCLA Home: About CERCLA, CERLCA Indexes, CERCLA Help Current Site > None Selected CERCLA HOME Laboratory for Energy-Related Health Research (LEHR) Fernald Preserve Monticello Site Mound Site - Miamisburg Closure Project Rocky Flats Site Weldon Spring Search the Administrative Record The White House USA.gov E-Gov Information Quality FOIA Privacy Program Jobs Opportunity Bulletin Board U.S. Department of

  4. Work plan for the remedial investigation/feasibility study for the groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    1995-08-01

    US Department of Energy (DOE) and the US Army Corps of Engineers (CE) are conducting cleanup activities at two properties, the chemical plant area and the ordnance works area, located adjacent to one another in St. Charles County, Missouri. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE and CE are evaluating conditions and potential responses at the chemical plant area and at the ordnance works area, respectively, to address groundwater and surface water contamination. This work plan provides a comprehensive evaluation of areas that are relevant to the (GWOUs) of both the chemical plant and the ordnance works area. Following areas or media are addressed in this work plan: groundwater beneath the chemical plant area (including designated vicinity properties described in Section 5 of the RI for the chemical plant area [DOE 1992d]) and beneath the ordnance works area; surface water and sediment at selected springs, including Burgermeister Spring. The organization of this work plan is as follows: Chapter 1 discusses the objectives for conducting the evaluation, including a summary of relevant site information and overall environmental compliance activities to be undertaken; Chapter 2 presents a history and a description of the site and areas addressed within the GWOUs, along with currently available data; Chapter 3 presents a preliminary evaluation of areas included in the GWOUs, which is based on information given in Section 2, and discusses data requirements; Chapter 4 presents rationale for data collection or characterization activities to be carried out in the remedial investigation (RI) phase, along with brief summaries of supporting documents ancillary to this work plan; Chapter 5 discusses the activities planned for GWOUs under each of the 14 tasks for an remedial (RI/FS); Chapter 6 presents proposed schedules for RI/FS for the GWOUS; and Chapter 7 explains the project management structure.

  5. Identification and Preliminary Assessment and Site Inspection Report for Quarry Bulk Wastes at the Weldon Spring Chemical Plant Quarry.

    Office of Legacy Management (LM)

  6. Letter: Draft Final Feasibility Study and Proposed Plan for the Quarry Residuals Operable Unit at the Weldon Spring Site.

    Office of Legacy Management (LM)

  7. Letter: Weldon Spring Site Remedial Action Program Quarry Water Treatment Plant. I-1500-1503-1.03.

    Office of Legacy Management (LM)

  8. Notice: DOE Announces the Proposed Plan for Remdial Action at the Quarry Residuals Operable Unit of the Weldon Spring Site.

    Office of Legacy Management (LM)

  9. Notice: DOE Announces the Proposed Plan for Remdial Action at the Quarry Residuals Operable Unit of the Weldon Spring Site.

    Office of Legacy Management (LM)

  10. Removal of Abandoned Power Lines and Poles From Weldon Spring Site. IR-600-603-1.01.

    Office of Legacy Management (LM)

  11. TRANSCRIPT OF THE AUGUST 13, 2003 PUBLIC MEETING WELDON SPRING SITE FOR THE: CHEMICAL PLANT GROUNDWATER OPERABLE UNIT,

    Office of Legacy Management (LM)

  12. Quarry Waste Removal Proposed Plan Weldon Spring Site Remedial Action Project, Weldon Spring Missouri. Meeting to be held March 29, 1990 is sponsored by the Department of Energy and Environmental Protection Agency

    Office of Legacy Management (LM)

  13. Remedial Investigation for the Quarry Residuals Operable Unit of the Weldon Spring Site, Weldon Spring, Missouri, Volume 1. DOE/OR/21548-587. QY-200-203-1.01.

    Office of Legacy Management (LM)

  14. Remedial Investigation for the Quarry Residuals Operable Unit of the Weldon Spring Site, Weldon Spring, Missouri, Volume 1. DOE/OR/21548-587. QY-200-203-1.02. Revision 2 (Final) is dated February 1998.

    Office of Legacy Management (LM)

  15. Remedial Investigation for the Quarry Residuals Operable Unit of the Weldon Spring Site, Weldon Spring, Missouri, Volume 2. DOE/OR/21548-587. QY-200-203-1.03. Revision 2 (Final) is dated February 1998.

    Office of Legacy Management (LM)

  16. Record of Decision: Record of Decision for Remedial Action for the Quarry Residuals Operable Unit at the Weldon Spring Site, Weldon Spring, Missouri. DOE/OR/21548-725

    Office of Legacy Management (LM)

  17. Baseline Risk Assessment for the Quarry Residuals Operable Unit of the Weldon Spring Site, Weldon Spring, Missouri. DOE/OR/21548-594. QY-200-203-1.04

    Office of Legacy Management (LM)

  18. Comments on Draft Feasibility Study (FS) for Remedial Action for the Quarry Residuals Operable Unit (QROU) at the Weldon Spring Site, and Draft Proposed Plan (PP) for the QROU at Weldon Spring. QY-500-501-1.04.

    Office of Legacy Management (LM)

  19. Engineering Evaluation/Cost Analysis (EE/CA) for the Proposed Removal Action at the Southeast Drainage at the Weldon Spring Site, Weldon Spring, Missouri. SE-200-201-1.02.

    Office of Legacy Management (LM)

  20. Engineering Evaluation/Cost Analysis (EE/CA) for the proposed Removal Action at the Southeast Drainage Near the Weldon Spring Site, Weldon Spring, Missouri. SE-200-201-1.03.

    Office of Legacy Management (LM)

  1. Evaluation and Cost Analysis: Engineering Evaluation/Cost Analysis for the Proposed Removal Action at the Southeast Drainage near the Weldon Spring Site, Weldon Spring, Missouri. DOE/OR/21548-584.

    Office of Legacy Management (LM)

  2. Letter: Weldon Spring Quarry Proposed Plan.

    Office of Legacy Management (LM)

  3. Microsoft Word - WeldonSpringFAQ.docx

    Office of Legacy Management (LM)

    U.S. Department of Energy (DOE), U.S. Geological Survey, and Missouri Department of ... detectable above background levels in samples from any private drinking water wells or ...

  4. DOE/OR/21548-193 CONTRACT NO. DE-AC05-860R21548 ANNUAL SITE ENVIRONMEN...

    Office of Legacy Management (LM)

    Data are included for both the Weldon Spring Chemical Plant and raffinate pits areas and ... Routine monitoring for radiation, radioactive materials, and chemical substances on and ...

  5. DOE - Office of Legacy Management -- Missouri

    Office of Legacy Management (LM)

    Missouri Missouri mo_map Missouri University Research Reactor Site Weldon Spring

  6. Oak Ridge Hosts EM Site Specific Advisory Board Spring Chairs Meeting

    Broader source: Energy.gov [DOE]

    Oak Ridge, Tenn. – More than 60 participants from across the country traveled to Oak Ridge this month to attend the EM Site Specific Advisory Board’s (SSAB) 2016 Spring Chairs Meeting. The event was hosted by the Oak Ridge Site Specific Advisory Board (ORSSAB).

  7. Letter and Archaeological Survey: A Phase 1 Archaeological Survey of the Southeast Drainage for the Weldon Spring Site Remedial Action Project, Saint Charles County, Missouri.

    Office of Legacy Management (LM)

  8. Letter: Cultural Resource Determination for the Non-Channel Area of the Southeast Drainage, a Part of the Weldon Spring Site Remedial Action Project (WSSRAP), Saint Charles, Missouri.

    Office of Legacy Management (LM)

  9. Letter: Engineering Evaluation/Cost Analysis (EE/CA) for the Proposed Removal Action at the Southeast Drainage Near the Weldon Spring Site.

    Office of Legacy Management (LM)

  10. Proposed Remedial Action Plan: Proposed Plan for Remedial Action at the Quarry Residuals Operable Unit of the Weldon Spring Site. DOE/OR/21548-724

    Office of Legacy Management (LM)

  11. Radiological Survey of the U. S. Army Reserve Property at the Weldon Spring Site. Final Report. IR-300-302-1.02.

    Office of Legacy Management (LM)

  12. Removal Action Decision Document for the Management of 15 Nonprocess Buildings (15 Series) at the Weldon Spring Site (WSS) Chemical Plant, DOE/OR/21548-151.

    Office of Legacy Management (LM)

  13. Waste Analysis Plan Weldon Spring Site Remedial Action Project. Revision 4 is dated August 1992. DOE/OR/21548-128.

    Office of Legacy Management (LM)

  14. Work Plan for the Remedial Investigation and Feasibility Study - Environmental Impact Statement for the Weldon Spring Site, DOE/OR/21548-033.

    Office of Legacy Management (LM)

  15. Work Plan: Work Plan for the Remedial Investigation/Feasibility Study - Environmental Assessment (RI/FS-EA) for the Quarry Residuals Operable Unit at the Weldon Spring Site.

    Office of Legacy Management (LM)

  16. Weldon Spring Site Environmental Report for Calendar Year 1995. DOE/OR/21548-592. QY-200-202-1.23.

    Office of Legacy Management (LM)

  17. Stable isotopic study of precipitation and spring discharge on the Nevada Test Site

    SciTech Connect (OSTI)

    Ingraham, N.L.; Jacobson, R.L.; Hess, J.W.; Lyles, B.F. . Water Resources Center Nevada Univ., Reno, NV . Water Resources Center)

    1990-07-01

    Precipitation was collected in southern Nevada (on the Nevada Test Site) on a semi-regular monthly basis at 41 locations for six years for stable isotopic analysis. The precipitation record shows two time-based regimes. For the first three years of collection, the precipitation was highly variable with several large events and several dry periods. During the last three years of collection, the precipitation was much more even with no large events. However, there is no correlation between the variability in the amount of precipitation and the stable isotopic composition of precipitation. In addition, the oxygen isotope composition and discharge of two springs, Whiterock Spring and Cane Spring, issuing from perched water tables, were monitored for five years in a similar time frame as for the precipitation. 17 refs., 42 figs., 3 tabs.

  18. PDSF at NERSC - Site Report … HEPiX Spring 2012 Workshop

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PDSF at NERSC Site Report - HEPiX Spring 2012 Workshop Eric Hjort, Larry Pezzaglia, Iwona Sakrejda National Energy Research Scientific Computing Center Lawrence Berkeley National Laboratory April 2012 Located at LBNL, NERSC is the primary computing center for the US DOE Office of Science NERSC serves a large population of ~4000 users, ~400 projects, and ~500 codes Focus is on "unique" resources Expert computing and other services 24x7 monitoring High-end computing and storage systems

  19. EA-1331: Remediation of Subsurface and Groundwater Contamination at the Rock Springs in situ Oil Shale Retort Site, Sweetwater County, Wyoming

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposal for the Rock Springs In-Situ Oil Shale Retort Test Site remediation that would be performed at the Rock Springs site in Sweetwater...

  20. Weldon Spring Federal Facility Agreement, January 28, 1992

    Office of Environmental Management (EM)

  1. Comments on Draft LTSP for Weldon Spring, Missouri

    Office of Legacy Management (LM)

  2. Fact Sheet: Water treatment facility at the Weldon Spring Quarry.

    Office of Legacy Management (LM)

  3. CHEM.PLANT.ADMIN.REC.302.1.08.T.PDF

    Office of Legacy Management (LM)

    of Decision for Remedial Action at the Chemical Plant Area of the Weldon Spring Site ... of Decision for Remedial Action at the Chemical Plant Area of the Weldon Spring Site ...

  4. CX-002194: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Demonstration Wind Turbine at Weldon Spring, Missouri, SiteCX(s) Applied: B5.1Date: 04/28/2010Location(s): Weldon Spring, MissouriOffice(s): Legacy Management

  5. PowerPoint Presentation

    Office of Legacy Management (LM)

    ... use restrictions are removed Restrict consumption of water at Springs 6301, 5301, 5302, ... Pam Thompson, Program Manager U.S. Department of Energy Weldon Spring Site Phone: (636) ...

  6. Letter and Report: The Department of the Army has requested the WSSRAP to conduct remedial action on several vicinity properties in the Army Reserve training area adjacent to the Weldon Spring Site.

    Office of Legacy Management (LM)

  7. Letter: Final Decision Document: Engineering Evaluation/Cost Analysis (EE/CA) for the Proposed Removal Action at the Southeast Drainage Near the Weldon Spring Site, Missouri (October, 1996).

    Office of Legacy Management (LM)

  8. Letter: Weldon Spring Site Remedial Action Project (WSSRAP) Responses to Missouri Department of Natural Resources (MDNR) Comments on the Southeast Drainage Engineering Evaluation/Cost Analysis (EE/CA).

    Office of Legacy Management (LM)

  9. This bulletin is for the people of St. Charles and St. Louis Counties who want to participate in decisions regarding the DOE's plan for treatment of contaminated surface water impounded at the Weldon Spring Chemical Plant Site (WSCP).

    Office of Legacy Management (LM)

  10. Record of Decision: Interim Record of Decision for Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, DOE/OR/21548-798.

    Office of Legacy Management (LM)

  11. Comments on the Draft Engineering Evaluation/Cost Analysis (EE/CA) for the Proposed Removal Action at the Southeast Drainage near the Weldon Spring Site, March 1996. SE-200-201-1.05

    Office of Legacy Management (LM)

  12. Decision Document: Engineering Evaluation/Cost Analysis (EE/CA) for the Proposed Removal Action at the Southeast Drainage Near the Weldon Spring Site, Missouri. DOE/OR/21548-584

    Office of Legacy Management (LM)

  13. Draft Proposed Plan (PP) for Remedial Action at Quarry Residuals Operable Unit, and Draft Feasibility Study (FS) for Remedial Action for the Quarry Residuals Operable Unit at Weldon Spring Site, June 1997. QY-500-501-1.05.

    Office of Legacy Management (LM)

  14. Superfund at work: Hazardous waste cleanup efforts nationwide, Spring 1993 (Powersville site profile, Peach County, Georgia)

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    The US Environmental Protection Agency (EPA) encountered much more than a municipal landfill at the Powersville site in Peach County, Georgia. Contamination from improperly dumped hazardous wastes and pesticides tainted an old quarry used for household garbage. Chemicals migrating into area ground water threatened local drinking water supplies. To address these issues, EPA's Superfund program designed a cleanup strategy that included: negotiating with the county and chemical companies to contain the hazardous wastes on site underneath a protective cover; investigating reports of drinking water contamination and extending municipal water lines to affected residents; and conducting a tailored community relations program to inform and educate residents about the site.

  15. Alaska Open-file Report 144 Assessment of Thermal Springs Sites Aleutian Arc, Atka Island to Becherof Lake -- Preliminary Results and Evaluation

    SciTech Connect (OSTI)

    Motyka, R.J.; Moorman, M.A.; Liss, S.A.

    1981-12-01

    Twenty of more than 30 thermal spring areas reported to exist in the Aleutian arc extending from Atka Island to Becherof Lake were investigated during July and August, 1980. Thermal activity of three of these sites had diminished substantially or no longer existed. At least seven more sites where thermal-spring activity is probable or certain were not visited because of their remoteness or because of time constraints. The existence of several other reported thermal spring sites could not be verified; these sites are considered questionable. On the basis of geothermometry, subsurface reservoir temperatures in excess of 150 C are estimated for 10 of the thermal spring sites investigated. These sites all occur in or near regions of Recent volcanism. Five of the sites are characterized by fumaroles and steaming ground, indicating the presence of at least a shallow vapor-dominated zone. Two, the Makushin Valley and Glacier Valley thermal areas, occur on the flanks of active Mukushin Volcano located on Unalaska Island, and may be connected to a common source of heat. Gas geothermometry suggests that the reservoir feeding the Kliuchef thermal field, located on the flanks of Kliuchef volcano of northeast Atka Island, may be as high as 239 C.

  16. Proposed Plan for the Management of Bulk Wastes at the Weldon Spring Quarry, Weldon Spring, Missouri. Plan is dated February 1990.

    Office of Legacy Management (LM)

  17. Proposed Weldon Spring Quarry Discharge Pipeline Project and Southeast Drainage Area (DOE), Weldon Spring, Saint Charles County, Missouri. SE-200-201-1.01.

    Office of Legacy Management (LM)

  18. Baseline Risk Evaluation for Exposure to Bulk Wastes at the Weldon Spring Quarry, Weldon Spring, Missouri. DOE/OR/21548-065.

    Office of Legacy Management (LM)

  19. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... (WIPP), Carlsbad, NM (United States) Weldon Spring Site ... Kinetic data and pH-rate profiles are indicative of His ... without causing cell death, likely by inhibiting ...

  20. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    (United States) Washington Procurement Operations Office, Washington, DC (United States) Waste Isolation Pilot Plant (WIPP), Carlsbad, NM (United States) Weldon Spring Site...

  1. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Weldon Spring Site Remedial Action Project, MO (United States) West Valley ... R.D. ; Knipmeyer, S.E. ; Nguyen, A. Catalytic hydrodenitrogenation (HDN) is a key step ...

  2. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Weldon Spring Site Remedial Action Project, MO (United States) West Valley ... 2+ distance becomes shorter, suggesting a tighter complex with the catalytic Mgsup 2+. ...

  3. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Weldon Spring Site Remedial Action Project, MO (United States) West Valley ... Carboxyl methylation of the PP2A catalytic subunit plays a critical role in regulating ...

  4. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Pilot Plant (WIPP), Carlsbad, NM (United States) Weldon Spring Site Remedial Action Project, MO (United States) West Valley Demonstration Project, West Valley, NY (United...

  5. Program Update: 3rd Quarter 2015 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Licensing Information; 2015 LM All-Hands Training; Ohio and the Manhattan Project; Recycling Building Foundation at the Weldon Spring, Missouri, Site; Environmental Justice ...

  6. Title page

    Office of Legacy Management (LM)

    ......... 4 3.1 Chemical Plant Operable Unit......THE WELDON SPRING SITE ...... 45 6.1 Chemical Plant Operable Unit......

  7. Search for: All records | SciTech Connect

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NM (United States) Weldon Spring Site Remedial Action Project, MO (United States) West Valley Demonstration Project, West Valley, NY (United States) Western Area Power...

  8. Microsoft Word - S07406_5YrRev

    Office of Legacy Management (LM)

    Response from State Regarding Wells within Special Area 4 This page intentionally left blank U.S. Department of Energy Weldon Spring Site Fourth Five-Year Review September 2011 Doc. No. S07406 Page C-1 Weldon Spring Site Fourth Five-Year Review U.S. Department of Energy Doc. No. S07406 September 2011 Page C-2 U.S. Department of Energy Weldon Spring Site Fourth Five-Year Review September 2011 Doc. No. S07406 Page C-3 Weldon Spring Site Fourth Five-Year Review U.S. Department of Energy Doc. No.

  9. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Weldon Spring Site Remedial Action Project, MO (United States) West Valley ... Repository Development (United States) Research Org: Sponsoring Org: Publication Date: ...

  10. Microsoft Word - Appendix M_ContingencyTrees.doc

    Office of Legacy Management (LM)

    M Groundwater Operable Unit Contingency Trees U.S. Department of Energy Weldon Spring Site LTS&M Plan July 2005 Doc. No. S0079000 Page M-3 Figure M-1. Validation and Statistical Evaluation Scheme Weldon Spring Site LTS&M Plan U.S. Department of Energy Doc. No. S0079000 July 2005 Page M-4 Figure M-2. Decision Tree for Objective 1 Data U.S. Department of Energy Weldon Spring Site LTS&M Plan July 2005 Doc. No. S0079000 Page M-5 Figure M-3. Decision Tree for Objective 2 Data Weldon

  11. Blue Star Memorial By-Way Dedication: Weldon Spring Interpretive Center |

    Energy Savers [EERE]

    Bioenergy Upcoming Events Bioenergy Upcoming Events April 2016 < prev next > Sun Mon Tue Wed Thu Fri Sat 27 28 29 30 31 1 2 3 4 5 6 7 8 9 U.S. Regional Association of the International Association for Landscape Ecology Annual Meeting 9:00AM to 5:00PM EDT 10 11 12 13 14 15 16 Oak Ridge National Laboratory Southeast United States Bioenergy Study Tour 2:00PM to 12:00PM EDT International Biomass Conference and Expo 8:00AM to 4:00PM EDT Algal Flow-way Technologies Webinar 12:00PM to 1:30PM EDT

  12. Information Bulletin: Informational Bulletin, Treating the Weldon Spring Quarry Water. I-1600-1606-1.07

    Office of Legacy Management (LM)

  13. Initial Assessment of the Effect of Drought Conditions on Contaminant Migration from the Weldon Spring Quarry.

    Office of Legacy Management (LM)

  14. Proposed Management of Contaminated Water in the Weldon Spring Quarry. IR-1500-1503-1.01.

    Office of Legacy Management (LM)

  15. Public Hearing on Weldon Spring Cleanup. I-1600-1603-1.14.

    Office of Legacy Management (LM)

  16. Public Meeting Scheduled for March 29 on Weldon Spring Quarry Waste Cleanup.

    Office of Legacy Management (LM)

  17. Record of Decision for the Weldon Spring Quarry Bulk Waste Management.

    Office of Legacy Management (LM)

  18. Sampling Plan: Weldon Spring Quarry Supplementary Environmental Monitoring Investigations Sampling Plan.

    Office of Legacy Management (LM)

  19. The Effects of a Perturbed Source on Contaminant Transport Near the Weldon Spring Quarry.

    Office of Legacy Management (LM)

  20. Weldon Spring Quarry System, Response to Letter Dated October 4, 1991.

    Office of Legacy Management (LM)

  1. Record of Decision for the Management of the Bulk Wastes at the Weldon Spring Quarry.

    Office of Legacy Management (LM)

  2. Documents Issued for Review by DOE for Weldon Spring. I1600-1603-1.16.

    Office of Legacy Management (LM)

  3. Preliminary Assessment for CAU 485: Cactus Spring Ranch Pu and DU Site CAS No. TA-39-001-TAGR: Soil Contamination, Tonopah Test Range, Nevada

    SciTech Connect (OSTI)

    1998-07-01

    Corrective Action Unit 485, Corrective Action Site TA-39-001-TAGR, the Cactus Spring Ranch Soil Contamination Area, is located approximately six miles southwest of the Area 3 Compound at the eastern mouth of Sleeping Column Canyon in the Cactus Range on the Tonopah Test Range. This site was used in conjunction with animal studies involving the biological effects of radionuclides (specifically plutonium) associated with Operation Roofer Coaster. The location had been used as a ranch by private citizens prior to government control of the area. According to historical records, Operation Roofer Coaster activities involved assessing the inhalation uptake of plutonium in animals from the nonnuclear detonation of nuclear weapons. Operation Roofer Coaster consisted of four nonnuclear destruction tests of a nuclear device. The four tests all took place during May and June 1963 and consisted of Double Tracks and Clean Slate 1, 11, and 111. Eighty-four dogs, 84 burros, and 136 sheep were used for the Double Tracks test, and ten sheep and ten dogs were used for Clean Slate 11. These animals were housed at Cactus Spring Ranch. Before detonation, all animals were placed in cages and transported to the field. After the shot, they were taken to the decontamination area where some may have been sacrificed immediately. All animals, including those sacrificed, were returned to Cactus Spring Ranch at this point to have autopsies performed or to await being sacrificed at a later date. A description of the Cactus Spring Ranch activities found in project files indicates the ranch was used solely for the purpose of the Roofer Coaster tests and bioaccumulation studies and was never used for any other project. No decontamination or cleanup had been conducted at Cactus Spring Ranch prior to the start of the project. When the project was complete, the pits at Cactus Spring Ranch were filled with soil, and trailers where dogs were housed and animal autopsies had been performed were removed. Additional pens and sheds were built to house and manage livestock involved with the Operation Roofer Coaster activities in 1963.

  4. Microsoft Word - Appendix N_Historical.doc

    Office of Legacy Management (LM)

    N Example Historical Marker and Plaque U.S. Department of Energy Weldon Spring Site LTS&M Plan July 2005 Doc. No. S0079000 Page N-3 Weldon Spring Site LTS&M Plan U.S. Department of Energy Doc. No. S0079000 July 2005 Page N-4

  5. Preliminary Assessment for CAU 485: Cactus Spring Ranch Pu and Du Site, CAS No. TA-39-001-TAGR: Soil Contamination, Tonapah Test Range, Nevada

    SciTech Connect (OSTI)

    ITLV

    1998-07-01

    Corrective Action Unit 485, Corrective Action Site TA-39-001-TAGR, the Cactus Spring Ranch Soil Contamination Area, is located approximately six miles southwest of the Area 3 Compound at the eastern mouth of Sleeping Column Canyon in the Cactus Range on the Tonopah Test Range. This site was used in conjunction with animal studies involving the biological effects of radionuclides (specifically plutonium) associated with Operation Roller Coaster. According to field records, a hardened layer of livestock feces ranging from 2.54 centimeters (cm) (1 inch [in.]) to 10.2 cm (4 in.) thick is present in each of the main sheds. IT personnel conducted a field visit on December 3, 1997, and noted that the only visible feces were located within the east shed, the previously fenced area near the east shed, and a small area southwest of the west shed. Other historical records indicate that other areas may still be covered with animal feces, but heavy vegetation now covers it. It is possible that radionuclides are present in this layer, given the history of operations in this area. Chemicals of concern may include plutonium and depleted uranium. Surface soil sampling was conducted on February 18, 1998. An evaluation of historical documentation indicated that plutonium should not be and depleted uranium could not be present at levels significantly above background as the result of test animals being penned at the site. The samples were analyzed for isotopic plutonium using method NAS-NS-3058. The results of the analysis indicated that plutonium levels of the feces and surface soil were not significantly elevated above background.

  6. Slide 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weldon Spring Site, Missouri Weldon Spring Cap - 44 acres 75 feet high Previous estimates of cap sizes - Hanford Site: U Plant - 17 acres PUREX - 81 acres T Plant - 31 acres B Plant - 27 acres REDOX - 23 acres Plutonium Finishing Plant - 69 acres T tank farm - 70 acres 200 West LLBG - 449 acres Weldon Spring Cap - 44 acres 75 feet high Previous estimates of cap sizes - Hanford Site: U Plant - 17 acres PUREX - 81 acres T Plant - 31 acres B Plant - 27 acres REDOX - 23 acres Plutonium Finishing

  7. Microsoft Word - S07406_5YrRev

    Office of Legacy Management (LM)

    Community Involvement This page intentionally left blank Public Notice, October 22, 2010 U.S. Department of Energy Weldon Spring Site Fourth Five-Year Review September 2011 Doc. No. S07406 Page A-1 Weldon Spring Site Fourth Five-Year Review U.S. Department of Energy Doc. No. S07406 September 2011 Page A-2 This page intentionally left blank Notification Letter to EPA and State, September 17, 2010 U.S. Department of Energy Weldon Spring Site Fourth Five-Year Review September 2011 Doc. No. S07406

  8. Geographic Information System Tools for Management of US DOE Sites - 13489

    SciTech Connect (OSTI)

    Carpenter, Cliff; Pilz, Elaine; Pawel, Steve

    2013-07-01

    The DOE Office of Legacy Management (LM) uses a variety of GIS tools to support long-term surveillance and maintenance (LTS and M) activities at DOE closure sites. These geo-spatial applications provide access to data both for external public viewing and for internal analysis and decision making. LM uses a custom geo-spatial application called geo-spatial Environmental Mapping System (GEMS) that draws validated information from a database of 4.6 million analytical results and 232,000 water level measurements for 58 LTS and M sites. These data were collected from transferred sites over a period of 40 years. The database is used to capture and store historical environmental information such as analytical chemistry data, groundwater depths and elevations, well logs, well construction data, geo-referenced boundaries, site physical features, and sampling locations from LTS and M sites. Stakeholders, regulators, and project personnel can use this Web-based application and data to display information in several forms, such as a tabular report, a graph, and a geo-spatial display, or the data can be labeled or highlighted in a map view. Institutional controls, with their LTS and M requirements and documentation, have recently been incorporated into a prototype GEMS Web page for the Weldon Spring, Missouri, Site. LM uses multiple internal GIS viewers to help ensure the future protection of human health and the environment. For example, at the Rocky Flats, Colorado, Site, LM uses a GIS application to display real property interests on authoritative maps. Another project is used to facilitate discussions at stakeholder meetings for the Rocky Flats site's Original Landfill. The Uranium Leasing Program uses multiple interactive maps that assist in ongoing monitoring and the oversight of lease-holders' activities. (authors)

  9. St. Charles County, Missouri: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Missouri O'Fallon, Missouri Portage Des Sioux, Missouri St. Charles, Missouri St. Paul, Missouri St. Peters, Missouri Weldon Spring Heights, Missouri Weldon Spring, Missouri...

  10. LM FIMS Database | Department of Energy

    Energy Savers [EERE]

    FIMS Database LM FIMS Database January 8, 2013 - 1:06pm Addthis A road is improved at the Grand Junction, Colorado, Disposal Site. A road is improved at the Grand Junction, Colorado, Disposal Site. A building is demolished at the Weldon Spring, Missouri, Site. A building is demolished at the Weldon Spring, Missouri, Site. An innovative cool roof installation increased energy efficiency at the Fernald Preserve, Ohio, offsite administrative building. An innovative cool roof installation increased

  11. The Missouri Department of Natural Resources (MDNR) has reviewed the Engineering Evaluation and Cost Analysis (EE / CA) for the Proposed Management of 15 Nonprocess Buildings (15 Series) at the Weldon Spring Site Chemical Plant (DOE/OR/21548-071), May 1989.

    Office of Legacy Management (LM)

  12. Comments on Draft Final Remedial Investigation (RI) for the Quarry Residuals Operable Unit, and Draft Final Baseline Risk Assessment (BRA) for the Quarry Residuals Operable Unit of the Weldon Spring Site, Both Dated April 1997. QY-500-501-1.03.

    Office of Legacy Management (LM)

  13. history.cdr

    Office of Legacy Management (LM)

    The Weldon Spring, Missouri, Site has transformed from a site once used to manufacture explosives and process uranium-ore concentrates to a publicly accessible area for recreation and education. The U.S. Army acquired 17,232 acres in St. Charles County near Weldon Spring, Missouri, in 1941 as part of the World War II defense effort. From 1941 to 1945, the U.S. Army produced explosives at the Weldon Spring Ordnance Works. After the war, the government transferred owner- ship of some of the land

  14. Microsoft Word - Appendix A.doc

    Office of Legacy Management (LM)

    Background Information, Remedial Action Histories, Final Site Conditions U.S. Department of Energy Weldon Spring Site LTS&M Plan February 2005 Second Draft Final Doc. No. S00790AG Page A-iii Contents A1.0 Weldon Spring Site Description and History................................................................... A-1 A1.1 Location and Property Ownership .......................................................................... A-1 A1.2 Physiography and

  15. Public Hearing Will Discuss Treating of Weldon Spring Chemical Plant's Tainted Water. I-1600-1603-1.15.

    Office of Legacy Management (LM)

  16. Sampling Plan Addendum 1: Weldon Spring Quarry Environmental Monitoring Investigations Sampling Plan, Addendum 1. DOE/OR/21548-264.

    Office of Legacy Management (LM)

  17. Sampling Plan: Weldon Spring Quarry Supplementary Environmental Monitoring Investigations Sampling Plan: Addendum 3. DOE/OR/21548-264

    Office of Legacy Management (LM)

  18. DOE Announces Plans for Weldon Spring Cleanup Made Available for Review. I-1600-1603-1.06.

    Office of Legacy Management (LM)

  19. Engineering Evaluation Cost Analysis for the Proposed Treatment of Contaminated Water Impounded at the Weldon Spring Chemical Plant Area.

    Office of Legacy Management (LM)

  20. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Weldon Spring Site Remedial Action Project, MO (United States) West Valley ... MycE is amore tetramer of a two-domain polypeptide, comprising a C-terminal catalytic ...

  1. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Weldon Spring Site Remedial Action Project, MO (United States) West Valley ... The aqueous stream is sent to a catalytic reactor where it is oxidized to obtain a product ...

  2. CX-012322: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Storm Shelter Installation and Related Activities at the Weldon Spring, Missouri, Site CX(s) Applied: B1.15, B3.1 Date: 06/11/2014 Location(s): Missouri Offices(s): Legacy Management

  3. Microsoft Word - Appendix D_LegalDescription.doc

    Office of Legacy Management (LM)

    Boundary for the Chemical Plant Area Weldon Spring Site LTS&M Plan U.S. Department of Energy Doc. No. S0079000 July 2005 Page D-4 Legal Description for the Chemical Plant Area All ...

  4. CX-013312: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Aerial Photography and Topographic Mapping of the Weldon Spring, Missouri, Site CX(s) Applied: B3.2Date: 12/23/2014 Location(s): MissouriOffices(s): Legacy Management

  5. Microsoft Word - Appendix F_OfficialContactList.doc

    Office of Legacy Management (LM)

    MO 65102 (573) 751-6160 Weldon Spring Site LTS&M Plan U.S. Department of Energy Doc. No. ... Charles, MO 63304 636-851-4700 Missouri Department of Conservation Mr. John Vogel August ...

  6. Salida Hot Springs (Poncha Spring) Space Heating Low Temperature...

    Open Energy Info (EERE)

    Salida Hot Springs (Poncha Spring) Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Salida Hot Springs (Poncha Spring) Space Heating Low...

  7. borrow_area.cdr

    Office of Legacy Management (LM)

    information at Weldon Spring, Missouri. This site is managed by the U.S. Department of Energy Office of Legacy Management. developed by the former WSSRAP Community Relations Department to provide comprehensive descriptions of key activities that took place throughout the cleanup process The Missouri Department of Conservation (MDC) approved a plan on June 9, 1995, allowing the U.S. Department of Energy (DOE) at the Weldon Spring Site Remedial Action Project (WSSRAP) to excavate nearly 2 million

  8. DOE - Office of Legacy Management

    Office of Legacy Management (LM)

    Weldon Spring Site Five-Year Review Survey Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA) requires that remedial actions, which result in any hazardous substances, pollutants, or contaminants remaining at a site be subject to a five-year review. The U.S. Department of Energy (DOE) is currently conducting its fourth five-year review at the Weldon Spring, Missouri,

  9. ARM - Spring 2002 Post-Workshop Evaluations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Post-Workshop Evaluations Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM Global Warming FAQ Just for Fun Meet our Friends Cool Sites Teachers Teachers' Toolbox Lesson Plans Spring 2002 Post-Workshop Evaluations This is the analysis of the post-workshop evaluations that were given to teachers in Manus after the ARM Climate Change Teacher Workshops held in spring of 2002. The Manus Workshop

  10. ARM - Spring 2002 Pre-Workshop Evaluations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pre-Workshop Evaluations Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM Global Warming FAQ Just for Fun Meet our Friends Cool Sites Teachers Teachers' Toolbox Lesson Plans Spring 2002 Pre-Workshop Evaluations This is the analysis of the post-workshop evaluations that were given to teachers in Manus after the ARM Climate Change Teacher Workshops held in spring of 2002. The Manus Workshop

  11. Coil spring venting arrangement

    DOE Patents [OSTI]

    McCugh, R.M.

    1975-10-21

    A simple venting device for trapped gas pockets in hydraulic systems is inserted through a small access passages, operated remotely, and removed completely. The device comprises a small diameter, closely wound coil spring which is pushed through a guide temporarily inserted in the access passage. The guide has a central passageway which directs the coil spring radially upward into the pocket, so that, with the guide properly positioned for depth and properly oriented, the coil spring can be pushed up into the top of the pocket to vent it. By positioning a seal around the free end of the guide, the spring and guide are removed and the passage is sealed.

  12. Spring bypass assembly

    DOE Patents [OSTI]

    Jablonski, Henry; Roughgarden, Jeffrey D.

    1984-02-07

    Pipe clamp comprises two substantially semicircular rim halves biased toward each other by spring assemblies. Adjustable stop means limit separation of the rim halves when the pipe expands.

  13. Spring Challenges | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Spring Challenges Spring Challenges! April 27, 2015 Spring is often an unstable period. Temperature fluctuations, pretty days interspersed with storms, blossom blasted by gusts of wind. That seems to have been the case at the Laboratory over the past several weeks. The 12 GeV Upgrade project was subjected to scrutiny in a mini-review conducted by the Office of Project Assessment. It went very well. This was partially because we had succeeded in projecting a more coherent view of the status of

  14. Motor Gasoline Assessment, Spring 1997

    Reports and Publications (EIA)

    1997-01-01

    Analyzes the factors causing the run up of motor gasoline prices during spring 1996 and the different market conditions during spring 1997 that caused prices to decline.

  15. CDP Spring Workshop 2016

    Broader source: Energy.gov [DOE]

    Combating climate change requires Silicon Valley innovation, which is why CDP (formerly the Carbon Disclosure Project), has partnered with Google for its annual Spring Workshop, which will be held...

  16. AESP Spring Conference

    Broader source: Energy.gov [DOE]

    The Association of Energy Services Professionals (AESP) is hosting its annual Spring Conference in Portland, Oregon, where attendees can hear from experts on the critical role technology and effective implementation play in energy efficiency programs.

  17. Microsoft Word - S07406_5YrRev

    Office of Legacy Management (LM)

    Inspection Photos and Checklist This page intentionally left blank U.S. Department of Energy Weldon Spring Site Fourth Five-Year Review September 2011 Doc. No. S07406 Page B-1 Photo 1. Burgermeister Spring. Photo 2. Inside Quarry Proper. Photo 3. Southeast drainage. Weldon Spring Site Fourth Five-Year Review U.S. Department of Energy Doc. No. S07406 September 2011 Page B-2 Photo 4. Highway D culverts outlet. Photo 5. Culvert under Highway 94. Photo 6. Disposal cell inspection looking south. U.S.

  18. Microsoft Word - Appendix H - InspectionChecklist.doc

    Office of Legacy Management (LM)

    H Annual Inspection Checklist U.S. Department of Energy Weldon Spring Site LTS&M Plan July 2005 Doc. No. S0079000 Page H-3 Annual Site Inspection Checklist Purpose of the Checklist This checklist has been developed from the EPA guidance document Comprehensive Five Year Review Guidance dated June 2001 (OSWER No. 9355.7-03B-P) and from Section 2.3 of the Long-Term Surveillance and Maintenance Plan for the Weldon Spring, Missouri, Site. The checklist was modified to site-specific conditions as

  19. Roller belleville spring damper

    SciTech Connect (OSTI)

    Hebel, J.B.

    1981-07-07

    A double acting damper for use in rotary drilling includes a splined tubular telescopic joint and employs plural paralleled stacks of double acting series stacked roller belleville spring washers in an annular pocket between the inner and outer tubular members of the joint. The springs, spline and telescopic bearings are in an oil filled volume sealed from the outside by a pressure seal at the lower end of the damper and a floating seal at the upper end. Electric and magnetic means are provided to check on the condition and quantity of the lubricant.

  20. Spring MRS 2016 - JCAP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Spring MRS 2016 Spring MRS 2016 Mon, Mar 28, 2016 6:00pm 18:00 Fri, Apr 1, 2016 7:00pm 19:00 Phoenix Convention Center 100 North 3rd Street Phoenix, Arizona 85004 United States Joel Ager, "Experimental Demonstrations of Solar-Driven Photoelectrochemical Water Splitting and Carbon Dioxide Reduction" John Gregoire, "High Throughput Materials Integration: Identifying Optimal Interfaces for Solar Fuels Applications" John Gregoire, "Accelerated Photoanode Discovery: A High

  1. Microsoft Word - S07406_5YrRev

    Office of Legacy Management (LM)

    Interview Forms This page intentionally left blank U.S. Department of Energy Weldon Spring Site Fourth Five-Year Review September 2011 Doc. No. S07406 Page D-1 INTERVIEW RECORD Site Name: Weldon Spring Site EPA ID No.: MO6210022830 Subject: Annual Inspection Time: 9:30 am Date: 10/12/10 Type: x Telephone Visit Other Location of Visit:  Incoming x Outgoing Contact Made By: Name: Terri Uhlmeyer Title: Compliance Manager Organization: SM Stoller, Corp. Individual Contacted: Name:

  2. Energy Matters - Spring 2002

    SciTech Connect (OSTI)

    2002-03-01

    Quarterly newsletter from DOE's Industrial Technologies Program to promote the use of energy-efficient industrial systems. The focus of the Spring 2002 Issue of Energy Matters focuses on premium energy efficiency systems, with articles on new gas technologies, steam efficiency, the Augusta Newsprint Showcase, and more.

  3. Memo and Sampling Plan: Additional Soil Characterization Sampling Plan Weldon Spring Quarry Quarry Rim Zone and Drainage Within Quarry. QY-200-201-1.08

    Office of Legacy Management (LM)

  4. Mrs Drey states that she had been directed to Walter Krywucki, Hydro-Pure Systems, for answers to her questions about the Weldon Spring quarry water treatment plant

    Office of Legacy Management (LM)

  5. Remedial Investigation for the Ground Water Operable Units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri, DOE/OR/21548-571

    Office of Legacy Management (LM)

  6. Removal Action Decision Document for the Management of Contaminated Structures at the Weldon Spring Chemical Plant (WSCP), DOE/OR/21548-208.

    Office of Legacy Management (LM)

  7. Removal Action Decision Document for the Management of Contaminated Structures at the Weldon Spring Chemical Plant; DOE/OR/21548-208.

    Office of Legacy Management (LM)

  8. Removal Action Decision Document for the Management of Contaminated Water Impounded at the Weldon Spring Chemical Plant Area, DOE/OR/21548-150.

    Office of Legacy Management (LM)

  9. Responsiveness Summary for the Engineering Evaluation Cost Analysis for the Proposed Management of Contaminated Water Impounded at the Weldon Spring Chemical Plant Area

    Office of Legacy Management (LM)

  10. Responsiveness Summary for the Engineering Evaluation/Cost Analysis for the Proposed Management of Contaminated Water in the Weldon Spring Quarry. IR-1500-1503-1.04.

    Office of Legacy Management (LM)

  11. Sampling Plan Addendum 2: Weldon Spring Quarry Supplementary Environmental Monitoring Investigations Sampling Plan, Addendum 2. DOE/OR/21548-264. QY-200-201-1.10.

    Office of Legacy Management (LM)

  12. Survey and Evaluation: Phase 1 Survey and Evaluation of Part of the Southeast Drainage of the Weldon Spring Remedial Action Project Area, Saint Charles County, Missouri.

    Office of Legacy Management (LM)

  13. The United States Department of Energy Announces the Availability of Four Public Documents Describing the Next Phase of the Weldon Spring Quarry Cleanup.

    Office of Legacy Management (LM)

  14. EE/CA Letter and Fax: Fax transmits a copy of a Weldon Spring Citizens Commission letter regarding the Engineering Evaluation Cost Assessment on the Southeast Drainage.

    Office of Legacy Management (LM)

  15. Engineering Evaluation Cost Analysis for the Proposed Management of Contaminated Structures at the Weldon Spring Chemical Plant. IR-1200-1203-1.01.

    Office of Legacy Management (LM)

  16. Engineering Evaluation Cost Analysis for the Proposed Management of Contaminated Structures at the Weldon Spring Chemical Plant. (IR-1300-1303-1.01

    Office of Legacy Management (LM)

  17. Engineering Evaluation Costs Analysis (EE/CA) for the Proposed Management of Contaminated Structures at the Weldon Spring Chemical Plant. IR-700-703-1.02.

    Office of Legacy Management (LM)

  18. Engineering Evaluation and Cost Analysis for the proposed Management of Contaminated Water in the Weldon Spring Quarry, DOE/OR/21548-039.

    Office of Legacy Management (LM)

  19. Engineering Evaluation/Cost Analysis for the Proposed Management of Contaminated Water in the Weldon Spring Quarry. IR-1500-1503-1.02.

    Office of Legacy Management (LM)

  20. Pebble Springs Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    Springs Wind Farm Jump to: navigation, search Name Pebble Springs Wind Farm Facility Pebble Springs Sector Wind energy Facility Type Commercial Scale Wind Facility Status In...

  1. Tuana Springs Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    Springs Wind Farm Jump to: navigation, search Name Tuana Springs Wind Farm Facility Tuana Springs Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status...

  2. Thousand Springs Wind Park | Open Energy Information

    Open Energy Info (EERE)

    Springs Wind Park Jump to: navigation, search Name Thousand Springs Wind Park Facility Thousand Springs Wind Park Sector Wind energy Facility Type Commercial Scale Wind Facility...

  3. Spring Canyon Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    Spring Canyon Wind Farm Jump to: navigation, search Name Spring Canyon Wind Farm Facility Spring Canyon Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility...

  4. public meeting 2008-04-30.cdr

    Office of Legacy Management (LM)

    U.S. Department of Energy Office of Legacy Management is Hosting a Public Meeting To Discuss the Annual Inspection of the Weldon Spring, Missouri, Site An informational session will be held at the Weldon Spring Site Interpretive Center to discuss the , and activities that have occurred since last year's meeting. The Interpretive Center is in southwestern St. Charles County, Missouri, approximately 35 miles west of St. Louis on Missouri State Route 94, 2 miles south of the Route 94 and U.S.

  5. untitled

    Office of Legacy Management (LM)

    8 August 2009 U.S. Department of Energy Office of Legacy Management U.S. Department of Energy Office of Legacy Management LMS/WEL/S05532 LMS/WEL/S05532 ENERGY Legacy Management U.S. DEPARTMENT OF This page intentionally left blank LMS/WEL/S05532 U.S. Department of Energy Office of Legacy Management Weldon Spring Site Environmental Report For Calendar Year 2008 August 2009 This page intentionally left blank U.S. Department of Energy Weldon Spring Site Environmental Report for Calendar Year 2008

  6. Spring 2016 National Transportation Stakeholders Forum Meeting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 National Transportation Stakeholders Forum Meeting, Florida Spring 2016 National Transportation Stakeholders Forum Meeting, Florida Spring 2016 National Transportation ...

  7. Spring 2015 National Transportation Stakeholders Forum Meeting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transportation Stakeholders Forum Meeting, New Mexico Spring 2015 National Transportation Stakeholders Forum Meeting, New Mexico Spring 2015 National Transportation Stakeholders ...

  8. Baltazor Springs Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    Baltazor Springs Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Baltazor Springs Geothermal Project Project Location...

  9. NNMCAB Newsletter: Spring 2016

    Broader source: Energy.gov [DOE]

    Inside This Issue: Meet the New Board Members, Slowing the Chromium Plume, LANLs Interim Measure, Members Tour LANL Site, EM-LAs New Site Manager, San Ildefonso Pueblo Presents at NNMCAB Meeting, New NNMCAB Webpage.

  10. Gaseous Emissions From Steamboat Springs, Brady'S Hot Springs...

    Open Energy Info (EERE)

    p. () Related Geothermal Exploration Activities Activities (3) Gas Flux Sampling At Brady Hot Springs Area (Lechler And Coolbaugh, 2007) Gas Flux Sampling At Desert Peak Area...

  11. Microsoft Word - Appendix A_Background.doc

    Office of Legacy Management (LM)

    Background Information, Remedial Action Histories, Present Site Conditions U.S. Department of Energy Weldon Spring Site LTS&M Plan July 2005 Doc. No. S0079000 Page A-iii Contents A1.1 Location and Property Ownership ................................................................................1 A1.2 Physiography and Topography.....................................................................................4 A1.3 Hydrogeology

  12. Microsoft Word - Appendix C_DisposalCellContents.doc

    Office of Legacy Management (LM)

    Disposal Cell Contents Table C-1. Contents of the Weldon Spring, Missouri, Disposal Cell U.S. Department of Energy Weldon Spring Site LTS&M Plan July 2005 Doc. No. S0079000 Page C-3 Work Zone Per WP437 and Material Description Cell Placement Considerations Occupied Cell Volume (cy) Raffinate Pits Work Zone CSS Grout Produced in CSS Plant and pumped to cell. Volume as determined at the plant. 188,443.00 Raffinate Pit 4 residual sludge Stabilized in situ with grout then mixed with TSA

  13. AMF Deployment, Steamboat Springs, Colorado

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Colorado Steamboat Deployment AMF Home Steamboat Springs Home Storm Peak Lab Data Plots and Baseline Instruments Data Sets Experiment Planning STORMVEX Proposal Abstract and...

  14. Spring loaded thermocouple module

    DOE Patents [OSTI]

    McKelvey, Thomas E. (Solana Beach, CA); Guarnieri, Joseph J. (San Diego, CA)

    1985-01-01

    A thermocouple arrangement is provided for mounting in a blind hole of a specimen. The thermocouple arrangement includes a cup-like holder member, which receives an elongated thermal insulator, one end of which is seated at an end wall of the holder. A pair of thermocouple wires, threaded through passageways in the insulator, extend beyond the insulator member, terminating in free ends which are joined together in a spherical weld bead. A spring, held captive within the holder, applies a bias force to the weld bead, through the insulator member. The outside surface of the holder is threaded for engagement with the blind hole of the specimen. When the thermocouple is installed in the specimen, the spherical contact surface of the weld bead is held in contact with the end wall of the blind hole, with a predetermined bias force.

  15. Spring loaded thermocouple module

    DOE Patents [OSTI]

    McKelvey, T.E.; Guarnieri, J.J.

    1984-03-13

    A thermocouple arrangement is provided for mounting in a blind hole of a specimen. The thermocouple arrangement includes a cup-like holder member, which receives an elongated thermal insulator, one end of which is seated at an end wall of the holder. A pair of thermocouple wires, threaded through passageways in the insulator, extend beyond the insulator member, terminating in free ends which are joined together in a spherical weld bead. A spring, held captive within the holder, applies a bias force to the weld bead, through the insulator member. The outside surface of the holder is threaded for engagement with the blind hole of the specimen. When the thermocouple is installed in the specimen, the spherical contact surface of the weld bead is held in contact with the end wall of the blind hole, with a predetermined bias force.

  16. Spring loaded locator pin assembly

    DOE Patents [OSTI]

    Groll, Todd A.; White, James P.

    1998-01-01

    This invention deals with spring loaded locator pins. Locator pins are sometimes referred to as captured pins. This is a mechanism which locks two items together with the pin that is spring loaded so that it drops into a locator hole on the work piece.

  17. Spring loaded locator pin assembly

    DOE Patents [OSTI]

    Groll, T.A.; White, J.P.

    1998-03-03

    This invention deals with spring loaded locator pins. Locator pins are sometimes referred to as captured pins. This is a mechanism which locks two items together with the pin that is spring loaded so that it drops into a locator hole on the work piece. 5 figs.

  18. 200 N. Spring Street

    Office of Legacy Management (LM)

    W. Alezander'Williams (301-427-1719) of my staff. ., Enclosures ,. : ,,. James W: Wagoner .I1 : Director .Off-SiteSavannah River Program Division Office of Eastern Area Programs ...

  19. NTSF Spring 2011 Agenda | Department of Energy

    Office of Environmental Management (EM)

    1 Agenda NTSF Spring 2011 Agenda Final Agenda for NTSF meeting in Denver Colorado. PDF icon NTSF Spring 2011 Agenda More Documents & Publications NTSF 2014 Meeting Agenda NTSF Newcomers' Orientation NTSF Spring 2014 Preliminary

  20. SpringWorks | Open Energy Information

    Open Energy Info (EERE)

    SpringWorks Jump to: navigation, search Name: SpringWorks Place: Minnetonka, Minnesota Zip: 55343-8684 Product: SpringWorks was created to discover and nurture incubation companies...

  1. Spring Already? | Department of Energy

    Energy Savers [EERE]

    Spring Already? Spring Already? March 22, 2011 - 5:25pm Addthis Drew Bittner Writer/Editor, Office of Energy Efficiency and Renewable Energy Seems we were just hunkering down for cold weather and bundling into our big coats just last week. Well, come to think of it, it WAS last week-it got pretty darn cold here in the DC area a couple of nights back. This might make you wonder when spring is going to get here. Good question. Even though the average temperature shows an upward trend over the

  2. Camp Springs Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    Wind Farm Jump to: navigation, search Name Camp Springs Wind Farm Facility Camp Springs Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner...

  3. Hot Springs Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    Wind Farm Jump to: navigation, search Name Hot Springs Wind Farm Facility Hot Springs Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Idaho...

  4. ARM - News from the Steamboat Springs Deployment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ColoradoNews from the Steamboat Springs Deployment Steamboat Deployment AMF Home Steamboat Springs Home Storm Peak Lab Data Plots and Baseline Instruments Data Sets Experiment...

  5. Warm Springs Greenhouses Greenhouse Low Temperature Geothermal...

    Open Energy Info (EERE)

    Warm Springs Greenhouses Greenhouse Low Temperature Geothermal Facility Jump to: navigation, search Name Warm Springs Greenhouses Greenhouse Low Temperature Geothermal Facility...

  6. Butte Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Butte Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Butte Springs Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3...

  7. Belmont Springs Hatchery Aquaculture Low Temperature Geothermal...

    Open Energy Info (EERE)

    Springs Hatchery Aquaculture Low Temperature Geothermal Facility Jump to: navigation, search Name Belmont Springs Hatchery Aquaculture Low Temperature Geothermal Facility Facility...

  8. Wessington Springs Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search Name Wessington Springs Wind Farm Facility Wessington Springs Wind Energy Center Sector Wind energy Facility Type Commercial Scale Wind Facility Status In...

  9. Silver Spring Networks Inc | Open Energy Information

    Open Energy Info (EERE)

    Spring Networks Inc Jump to: navigation, search Name: Silver Spring Networks Inc Place: Redwood City, California Zip: 94063 Product: California-based, developer of utility...

  10. Spring Home Maintenance: Windows, Windows, Windows! | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Spring Home Maintenance: Windows, Windows, Windows Spring Home Maintenance: Windows, Windows, Windows April 26, 2013 - 11:42am Addthis Caulking is an easy way to reduce air ...

  11. LM 05-15 | Department of Energy

    Energy Savers [EERE]

    5-15 LM 05-15 NEPA ID: LM 05-14 Determination: B1.15; B3.1 Short Title: Storm Shelter Installation and Related Activities at the Weldon Spring, Missouri, Site PDF icon LM 05-14 More Documents & Publications CX-012322: Categorical Exclusion Determination CX-013312: Categorical Exclusion Determination LM 28-14

  12. LM 28-14 | Department of Energy

    Energy Savers [EERE]

    8-14 LM 28-14 NEPA ID: LM 28-14. Short Title: Aerial Photography and Topographic Mapping of the Weldon Spring, Missouri, Site. Determination: B3.2 PDF icon LM 28-14 More Documents & Publications CX-013312: Categorical Exclusion Determination CX-013695: Categorical Exclusion Determination CX-007901

  13. Archived Soil & Groundwater Master Reports | Department of Energy

    Energy Savers [EERE]

    Archived Soil & Groundwater Master Reports Archived Soil & Groundwater Master Reports Archived Soil & Groundwater Master Reports Amchitka Ashtabula Fernald Environmental Management Project Maybell Miamisburg Environmental Management Project Rocky Flats Environmental Technology Site Shiprock Slick Rock South Valley Spook Tuba City Weldon Spring Miscellaneous

  14. Spook Archived Soil & Groundwater Master Reports | Department of Energy

    Office of Environmental Management (EM)

    Spook Archived Soil & Groundwater Master Reports Spook Archived Soil & Groundwater Master Reports Spook Archived Soil & Groundwater Master Reports PDF icon Spook - Spook More Documents & Publications Tuba City Archived Soil & Groundwater Master Reports Slick Rock Archived Soil & Groundwater Master Reports Weldon Spring Site Archived Soil & Groundwater Master Reports

  15. UVIG 2015 Spring Technical Workshop

    Broader source: Energy.gov [DOE]

    The 2015 UVIG Spring Technical Workshop will provide attendees with an expanded perspective on the status of wind and solar generation in utility systems in the United States and other countries....

  16. EIS-0201: Coyote Springs Cogeneration Project, Morrow County, Oregon

    Broader source: Energy.gov [DOE]

    This environmental impact statement analyzes the protential impacts of the Coyote Springs Cogeneration Project, a proposed natural gas-fired cogeneration power plant near Boardman, Oregon. The proposed power plant would be built on a 22-acre site in the Port of Morrow Industrial Park. The plant would have two combustion turbines that would generate 440 average megawatts of energy when completed.

  17. User News. Volume 17, Number 1 -- Spring 1996

    SciTech Connect (OSTI)

    1996-07-01

    This is a newsletter for users of the DOE-2, PowerDOE, SPARK, and BLAST building energy simulation programs. The topics for the Spring 1996 issue include the SPARK simulation environment, DOE-2 validation, listing of free fenestration software from LBNL, Web sites for building energy efficiency, the heat balance method of calculating building heating and cooling loads.

  18. Motor gasoline assessment, Spring 1997

    SciTech Connect (OSTI)

    1997-07-01

    The springs of 1996 and 1997 provide an excellent example of contrasting gasoline market dynamics. In spring 1996, tightening crude oil markets pushed up gasoline prices sharply, adding to the normal seasonal gasoline price increases; however, in spring 1997, crude oil markets loosened and crude oil prices fell, bringing gasoline prices down. This pattern was followed throughout the country except in California. As a result of its unique reformulated gasoline, California prices began to vary significantly from the rest of the country in 1996 and continued to exhibit distinct variations in 1997. In addition to the price contrasts between 1996 and 1997, changes occurred in the way in which gasoline markets were supplied. Low stocks, high refinery utilizations, and high imports persisted through 1996 into summer 1997, but these factors seem to have had little impact on gasoline price spreads relative to average spread.

  19. Question of the Week: How Will You Save Energy this Spring? ...

    Broader source: Energy.gov (indexed) [DOE]

    EERE's Stay Cool, Save Money site has some tips for how you can save energy and money at the weather heats up. How will you save energy this spring? Each Thursday, you have the...

  20. Biorenewable Deployment Consortium Spring Symposium

    Broader source: Energy.gov [DOE]

    The Biorenewable Deployment Consortium Spring Symposium will be held this year in downtown Charleston, South Carolina on March 30—31, 2016. Bioenergy Technologies Office Technology Manager Elliott Levine will be giving an update on the Office’s programs and recently announced solicitations and activities. The symposium will also include other federal agency updates and commercial progress panels, especially concerning sugar conversion processes.

  1. Thomas Pauling | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Thomas Pauling About Us Thomas Pauling Director, Office of Business Operations Thomas Pauling became the Director of the LM Office of Business Operations (OBO) in March 2016. Mr. Pauling has also served LM as Director of Site Operations, Environment Team Leader, and staff-level Site Manager. Prior to 2004 he worked 11 years for DOE's Environmental Management program at the Weldon Spring Site in Missouri, managing projects and environmental compliance during the site's cleanup phase, while

  2. Colorado's Hot Springs | Open Energy Information

    Open Energy Info (EERE)

    Hot Springs Jump to: navigation, search OpenEI Reference LibraryAdd to library Book: Colorado's Hot Springs Author D. Frazier Published Pruett Publishing Company, 2000 DOI Not...

  3. NNMCAB Newsletter: Spring 2014 | Department of Energy

    Office of Environmental Management (EM)

    4 NNMCAB Newsletter: Spring 2014 Inside This Issue: Environmental Justice Conference New Pojoaque Valley Student Art Chairs Corner Recommendation 2014-01 FY'16 Budget Priorities PDF icon Volume II, Issue II - Spring 2014

  4. Crane Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Crane Hot Springs Geothermal Area (Redirected from Crane Hot Springs Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Crane Hot Springs Geothermal Area Contents 1...

  5. Roosevelt Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Roosevelt Hot Springs Geothermal Area (Redirected from Roosevelt Hot Springs Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Roosevelt Hot Springs Geothermal...

  6. Hot Springs Ranch Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Hot Springs Ranch Geothermal Area (Redirected from Hot Springs Ranch Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Hot Springs Ranch Geothermal Area Contents 1...

  7. Pilgrim Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Pilgrim Hot Springs Geothermal Area (Redirected from Pilgrim Hot Springs Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Pilgrim Hot Springs Geothermal Area...

  8. Verde Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Verde Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Verde Hot Springs...

  9. Spring 2014 National Transportation Stakeholder Forum Meeting...

    Energy Savers [EERE]

    Transportation Stakeholder Forum Meeting, Minnesota Spring 2014 National Transportation Stakeholder Forum Meeting, Minnesota NTSF 2014 Meeting Agenda PRESENTATIONS - MAY 13, ...

  10. Spring 2014 Composite Data Products: Backup Power

    SciTech Connect (OSTI)

    Kurtz, J.; Sprik, S.; Saur, G.

    2014-06-01

    This report includes 30 composite data products (CDPs) produced in Spring 2014 for fuel cell backup power systems.

  11. Shoal, Nevada, Site Fact Sheet

    Office of Legacy Management (LM)

    Shoal, Nevada, Site. This site is managed by the U.S. Department of Energy Office of Legacy Management. Shoal, Nevada, Site Location of the Shoal, Nevada, Site Site Description and History The Shoal site is situated on 2,560 acres of withdrawn federal lands within the north-central portion of the Sand Springs Range in Churchill County, Nevada. The town of Fallon is the largest populated area in the region and is about 30 miles northwest of the site. The region around the Shoal site is sparsely

  12. Spring 2006 ASA Meeting Disclaimer

    U.S. Energy Information Administration (EIA) Indexed Site

    6 Meeting of the American Statistical Association Committee on Energy Statistics and the Energy Information Administration In two adjacent files you may find unedited transcripts of EIA's spring 2006 meeting with the American Statistical Association Committee on Energy Statistics. Beginning with the fall 2003 meeting, EIA no longer edits these transcripts. Summaries of previous meetings may be found to the right of the Thursday and Friday transcripts. The public meeting took place April 6 and 7,

  13. Spring 2006 ASA Meeting Disclaimer

    U.S. Energy Information Administration (EIA) Indexed Site

    7 Meeting of the American Statistical Association Committee on Energy Statistics and the Energy Information Administration In two adjacent files you will find unedited transcripts of EIA's spring 2007 meeting with the American Statistical Association Committee on Energy Statistics. Beginning with the fall 2003 meeting, EIA no longer edits these transcripts. Summaries of previous meetings can be found to the right of the Thursday and Friday transcripts. The public meeting took place April 19 and

  14. Spring 2008 ASA Meeting Disclaimer

    U.S. Energy Information Administration (EIA) Indexed Site

    8 Meeting of the American Statistical Association Committee on Energy Statistics and the Energy Information Administration In two adjacent files you will find unedited transcripts of EIA's spring 2008 meeting with the American Statistical Association Committee on Energy Statistics. Beginning with the fall 2003 meeting, EIA no longer edits these transcripts. Summaries of previous meetings can be found to the right of the Thursday and Friday transcripts. The public meeting took place on April 9,

  15. Spring 2009 ASA Meeting Disclaimer

    U.S. Energy Information Administration (EIA) Indexed Site

    9 Meeting of the American Statistical Association Committee on Energy Statistics and the Energy Information Administration In two adjacent files you will find unedited transcripts of EIA's spring 2009 meeting with the American Statistical Association Committee on Energy Statistics. Beginning with the fall 2003 meeting, EIA no longer edits these transcripts. Summaries of previous meetings can be found to the right of the Thursday and Friday transcripts. The public meeting took place on April 2

  16. Leach Hot Springs Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    Springs Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Leach Hot Springs Geothermal Project Project Location Information...

  17. Neal Hot Springs Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    Springs Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Neal Hot Springs Geothermal Project Project Location Information...

  18. Colorado Springs Utilities- Energy Efficient Builder Program

    Broader source: Energy.gov [DOE]

    The Colorado Springs Utilities (CSU) Energy Efficient Builder Program offers an incentive to builders who construct ENERGY STAR qualified homes within the CSU service area. The incentive range...

  19. Confederated Tribes of Warm Springs - Geothermal Feasibility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Oregon repared by: Warm Springs Power Enterprises History with Energy Developments History ... reconnaissance * * 2003 began wind energy assessment on tribal lands, ...

  20. Addison (Webster Springs), West Virginia: Energy Resources |...

    Open Energy Info (EERE)

    Addison (Webster Springs), West Virginia: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 38.4780477, -80.4090044 Show Map Loading map......

  1. Paleomagnetic Measurements At Roosevelt Hot Springs Geothermal...

    Open Energy Info (EERE)

    of the Roosevelt Hot Springs Geothermal Area. Notes Paleomagnetic dating performed by Brown (1977) on opal samples in order to date the age of the hydrothermal system. The...

  2. STATISTICAL PERFORMANCE EVALUATION OF SPRING OPERATED PRESSURE...

    Office of Scientific and Technical Information (OSTI)

    VALVE RELIABILITY IMPROVEMENTS 2004 TO 2014 Citation Details In-Document Search Title: STATISTICAL PERFORMANCE EVALUATION OF SPRING OPERATED PRESSURE RELIEF VALVE RELIABILITY ...

  3. Stallion Springs, California: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Stallion Springs, California: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.0888553, -118.6425912 Show Map Loading map......

  4. FUPWG Spring 2016 Agenda and Presentations

    Broader source: Energy.gov [DOE]

    This page features presentations given at the spring 2016 Federal Utility Partnership Working Group (FUPWG) seminar on May 18-19, 2016, at the Marriot in Cincinnati, Ohio.

  5. STATISTICAL PERFORMANCE EVALUATION OF SPRING OPERATED PRESSURE...

    Office of Scientific and Technical Information (OSTI)

    STATISTICAL PERFORMANCE EVALUATION OF SPRING OPERATED PRESSURE RELIEF VALVE RELIABILITY IMPROVEMENTS 2004 TO 2014 Citation Details In-Document Search Title: STATISTICAL PERFORMANCE ...

  6. Glenwood Springs Amendments | Open Energy Information

    Open Energy Info (EERE)

    2002 DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Glenwood Springs Amendments Citation BLM Colorado River Valley Field Office...

  7. disposal_cell.cdr

    Office of Legacy Management (LM)

    The disposal cell was constructed in the area formerly occupied by the Weldon Spring Uranium Feed Materials Plant production buildings. The cell provides long-term isolation and ...

  8. raffinate_pit.cdr

    Office of Legacy Management (LM)

    When the Weldon Spring Chemical Plant was operational from 1957 to 1966, four unlined pits ... Onsite chemical stabilization and solidification (CSS) was selected as the technology for ...

  9. Microsoft Word - DOE-GJ-97491-952-FINAL DRAFT_S01406.doc

    Office of Legacy Management (LM)

    ... Figure 1-2. Layout of the Weldon Spring Chemical Plant......the Burlington-Keokuk Limestone at the Chemical Plant Area ......

  10. Long-Term Surveillance and Maintenance at Rocky Flats: Early...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rocky Flats Overview EA-1747: Final Environmental Assessment The Use of Ecological Restoration Principles To Achieve Remedy Protection at the Fernald Preserve and Weldon Spring ...

  11. Microsoft Word - TR01-15.doc

    Office of Legacy Management (LM)

    ... and interview records U.S. Department of Energy 2008 Annual Inspection - Weldon Spring, ... Department of Conservation * Cynthia Green - Missouri Department of Conservation * ...

  12. Microsoft Word - TR02-23.doc

    Office of Legacy Management (LM)

    ... Library U.S. Department of Energy 2005 Annual Inspection - Weldon Spring, ... Department of Conservation * Cynthia Green - Missouri Department of Conservation * ...

  13. Microsoft Word - TR12-17.doc

    Office of Legacy Management (LM)

    ... Department of Conservation * Cynthia Green - Missouri Department of Conservation * ... - Weldon Spring, Missouri U.S. Department of Energy Page 20 December 2007 The St. ...

  14. Microsoft Word - TR01-18.doc

    Office of Legacy Management (LM)

    ... Department of Conservation * Cynthia Green - Missouri Department of Conservation * ... as Appendix E. U.S. Department of Energy 2006 Annual Inspection - Weldon Spring, ...

  15. air_water.cdr

    Office of Legacy Management (LM)

    122011 Air Monitoring Groundwater Monitoring Surface Water Monitoring A continuously operating air monitoring network was in place from 1986 through 2000 for the Weldon Spring ...

  16. Microsoft Word - Appendix E_InstiControls.doc

    Office of Legacy Management (LM)

    Institutional Control Documentation U.S. Department of Energy Weldon Spring Site LTS&M Plan July 2005 Doc. No. S0079000 Page E-iii Appendix E Institutional Control Documentation Notation on Ownership Record for Notification to Potential Owners of Contaminated Groundwater and Applied Restrictions Chemical Plant Site and Quarry Areas (Recorded Book 3754, Pages 419-424, St. Charles County, Missouri)................................E-1 Real Estate License, Groundwater Wells and Sampling on

  17. Microsoft Word - Appendix G_DistributionList.doc

    Office of Legacy Management (LM)

    Distribution List U.S. Department of Energy Weldon Spring Site LTS&M Plan July 2005 Doc. No. S0079000 Page G-3 Except for individual stakeholders, this distribution list is composed of people representing organizations, which have expressed interest in site activities. When individual turnover occurs in these positions, DOE will revise the list to reflect the current holder of these positions. This type of revision is considered minor and not subject to review. All individuals on this list

  18. FINAL REPORT WIND POWER WARM SPRINGS RESERVATION TRIBAL LANDS DOE GRANT NUMBER DE-FG36-07GO17077 SUBMITTED BY WARM SPRINGS POWER & WATER ENTERPRISES A CORPORATE ENTITY OF THE CONFEDERATED TRIBES OF WARM SPRINGS WARM SPRINGS, OREGON

    SciTech Connect (OSTI)

    Jim Manion; Michael Lofting; Wil Sando; Emily Leslie; Randy Goff

    2009-03-30

    Wind Generation Feasibility Warm Springs Power and Water Enterprises (WSPWE) is a corporate entity owned by the Confederated Tribes of the Warm Springs Reservation, located in central Oregon. The organization is responsible for managing electrical power generation facilities on tribal lands and, as part of its charter, has the responsibility to evaluate and develop renewable energy resources for the Confederated Tribes of Warm Springs. WSPWE recently completed a multi-year-year wind resource assessment of tribal lands, beginning with the installation of wind monitoring towers on the Mutton Mountains site in 2003, and collection of on-site wind data is ongoing. The study identified the Mutton Mountain site on the northeastern edge of the reservation as a site with sufficient wind resources to support a commercial power project estimated to generate over 226,000 MWh per year. Initial estimates indicate that the first phase of the project would be approximately 79.5 MW of installed capacity. This Phase 2 study expands and builds on the previously conducted Phase 1 Wind Resource Assessment, dated June 30, 2007. In order to fully assess the economic benefits that may accrue to the Tribes through wind energy development at Mutton Mountain, a planning-level opinion of probable cost was performed to define the costs associated with key design and construction aspects of the proposed project. This report defines the Mutton Mountain project costs and economics in sufficient detail to allow the Tribes to either build the project themselves or contract with a developer under the most favorable terms possible for the Tribes.

  19. Hawaii basic data for thermal springs and wells as recorded in geotherm

    SciTech Connect (OSTI)

    Bliss, J.D.

    1983-07-01

    GEOTHERM sample file contains 34 records for Hawaii. The high average ambient air temperature found on the Hawaiian Islands required fluid samples to have a temperature of at least 30/sup 0/C to be included. A computer-generated index is found in appendices A of this report. The index give one line summaries of each GEOTHERM record describing the chemistry of geothermal springs and wells in the sample file for Hawaii. The index is found in appendix A (p. is sorted by county and by the name of the source. Also given are well number (when appropriate), site type (spring, well, fumarole), latitude, longitude (both use decimal minutes), GEOTHERM record identifier, and temperature (/sup 0/C). In conducting a search of Appendix A, site names are quite useful for locating springs or wells for which a specific name is commonly used, but sites which do not have specific names are more difficult to locate.

  20. Site Index - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Index Site Index Calendar Hanford Blog Archive Search Site Feeds Site Index Weather What's New Site Index Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size About Us About Hanford Cleanup Regulators, Boards, Councils Hanford Advisory Board Hanford Natural Resource Trustee Council Environmental Protection Agency Washington State Department of Ecology Defense Nuclear Facilities Safety Board Hanford History Hanford Site Wide Programs DOE Human Resources Management

  1. NTSF Spring 2012 Agenda | Department of Energy

    Office of Environmental Management (EM)

    2 Agenda NTSF Spring 2012 Agenda Meeting agenda with times and descriptions of events. PDF icon NTSF Spring 2012 Agenda More Documents & Publications Northeast High-Level Radioactive Waste Transportation Task Force Agenda Midwestern Radioactive Materials Transportation Committee Agenda NTSF 2015

  2. Proceedings of the geosciences workshop

    SciTech Connect (OSTI)

    1991-01-01

    The manuscripts in these proceedings represent current understanding of geologic issues associated with the Weldon Spring Site Remedial Action Project (WSSRAP). The Weldon Spring site is in St. Charles County, Missouri. The proceedings are the record of the information presented during the WSSRAP Geosciences Workshop conducted on February 21, 1991. The objective of the workshop and proceedings is to provide the public and scientific community with technical information that will facilitate a common understanding of the geology of the Weldon Spring site, of the studies that have been and will be conducted, and of the issues associated with current and planned activities at the site. This coverage of geologic topics is part of the US Department of Energy overall program to keep the public fully informed of the status of the project and to address public concerns as we clean up the site and work toward the eventual release of the property for use by this and future generations. Papers in these proceedings detail the geology and hydrology of the site. The mission of the WSSRAP derives from the US Department of Energy's Surplus Facilities Management Program. The WSSRAP will eliminate potential hazards to the public and the environment and make surplus real property available for other uses to the extent possible. This will be accomplished by conducting remedial actions which will place the quarry, the raffinate pits, the chemical plant, and the vicinity properties in a radiologically and chemically safe condition. The individual papers have been catalogued separately.

  3. Baseline Risk Assessment for the Ground Water Operable Unit (GWOU) at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri, DOE/OR/21548-568

    Office of Legacy Management (LM)

  4. Feasibility Study for Remedial Action for the Ground Water Operable Units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri; DOE/OR/21548-569

    Office of Legacy Management (LM)

  5. Cross-shaped torsional spring

    DOE Patents [OSTI]

    Williamson, Matthew M.; Pratt, Gill A.

    1999-06-08

    The invention provides an elastic actuator consisting of a motor and a motor drive transmission connected at an output of the motor. An elastic element is connected in series with the motor drive transmission, and this elastic element is positioned to alone support the full weight of any load connected at an output of the actuator. A single force transducer is positioned at a point between a mount for the motor and an output of the actuator. This force transducer generates a force signal, based on deflection of the elastic element, that indicates force applied by the elastic element to an output of the actuator. An active feedback force control loop is connected between the force transducer and the motor for controlling the motor. This motor control is based on the force signal to deflect the elastic element an amount that produces a desired actuator output force. The produced output force is substantially independent of load motion. The invention also provides a torsional spring consisting of a flexible structure having at least three flat sections each connected integrally with and extending radially from a central section. Each flat section extends axially along the central section from a distal end of the central section to a proximal end of the central section.

  6. Cross-shaped torsional spring

    DOE Patents [OSTI]

    Williamson, M.M.; Pratt, G.A.

    1999-06-08

    The invention provides an elastic actuator consisting of a motor and a motor drive transmission connected at an output of the motor. An elastic element is connected in series with the motor drive transmission, and this elastic element is positioned to alone support the full weight of any load connected at an output of the actuator. A single force transducer is positioned at a point between a mount for the motor and an output of the actuator. This force transducer generates a force signal, based on deflection of the elastic element, that indicates force applied by the elastic element to an output of the actuator. An active feedback force control loop is connected between the force transducer and the motor for controlling the motor. This motor control is based on the force signal to deflect the elastic element an amount that produces a desired actuator output force. The produced output force is substantially independent of load motion. The invention also provides a torsional spring consisting of a flexible structure having at least three flat sections each connected integrally with and extending radially from a central section. Each flat section extends axially along the central section from a distal end of the central section to a proximal end of the central section. 30 figs.

  7. Spring/dimple instrument tube restraint

    DOE Patents [OSTI]

    DeMario, E.E.; Lawson, C.N.

    1993-11-23

    A nuclear fuel assembly for a pressurized water nuclear reactor has a spring and dimple structure formed in a non-radioactive insert tube placed in the top of a sensor receiving instrumentation tube thimble disposed in the fuel assembly and attached at a top nozzle, a bottom nozzle, and intermediate grids. The instrumentation tube thimble is open at the top, where the sensor or its connection extends through the cooling water for coupling to a sensor signal processor. The spring and dimple insert tube is mounted within the instrumentation tube thimble and extends downwardly adjacent the top. The springs and dimples restrain the sensor and its connections against lateral displacement causing impact with the instrumentation tube thimble due to the strong axial flow of cooling water. The instrumentation tube has a stainless steel outer sleeve and a zirconium alloy inner sleeve below the insert tube adjacent the top. The insert tube is relatively non-radioactivated inconel alloy. The opposed springs and dimples are formed on diametrically opposite inner walls of the insert tube, the springs being formed as spaced axial cuts in the insert tube, with a web of the insert tube between the cuts bowed radially inwardly for forming the spring, and the dimples being formed as radially inward protrusions opposed to the springs. 7 figures.

  8. Spring/dimple instrument tube restraint

    DOE Patents [OSTI]

    DeMario, Edmund E.; Lawson, Charles N.

    1993-01-01

    A nuclear fuel assembly for a pressurized water nuclear reactor has a spring and dimple structure formed in a non-radioactive insert tube placed in the top of a sensor receiving instrumentation tube thimble disposed in the fuel assembly and attached at a top nozzle, a bottom nozzle, and intermediate grids. The instrumentation tube thimble is open at the top, where the sensor or its connection extends through the cooling water for coupling to a sensor signal processor. The spring and dimple insert tube is mounted within the instrumentation tube thimble and extends downwardly adjacent the top. The springs and dimples restrain the sensor and its connections against lateral displacement causing impact with the instrumentation tube thimble due to the strong axial flow of cooling water. The instrumentation tube has a stainless steel outer sleeve and a zirconium alloy inner sleeve below the insert tube adjacent the top. The insert tube is relatively non-radioactivated inconel alloy. The opposed springs and dimples are formed on diametrically opposite inner walls of the insert tube, the springs being formed as spaced axial cuts in the insert tube, with a web of the insert tube between the cuts bowed radially inwardly for forming the spring, and the dimples being formed as radially inward protrusions opposed to the springs.

  9. NTSF Spring 2014 Preliminary Agenda | Department of Energy

    Office of Environmental Management (EM)

    4 Preliminary Agenda NTSF Spring 2014 Preliminary Agenda Preliminary Meeting Agenda PDF icon NTSF Spring 2014 Preliminary Agenda More Documents & Publications NTSF 2014 Meeting Agenda NTSF Spring 2010 Final Agenda NTSF 2013 Agenda

  10. NTSF Spring 2015 Registration Announcement | Department of Energy

    Office of Environmental Management (EM)

    Registration Announcement NTSF Spring 2015 Registration Announcement It's time to register for the 2015 U.S. Department of Energy National Transportation Stakeholders Forum being held in Albuquerque, New Mexico on May 12-14. PDF icon NTSF Spring 2015 Registration Announcement More Documents & Publications NTSF Spring 2015 Save the Date NTSF Spring 2015 Registration Announcement Spring 2015 National Transportation Stakeholders Forum Meeting, New Mexico NTSF Spring 2013 Save The Date

  11. Geology and Geothermal Potential of the Roosevelt Hot Springs...

    Open Energy Info (EERE)

    Field Mapping At Roosevelt Hot Springs Geothermal Area (Petersen, 1975) Geothermal Literature Review At Roosevelt Hot Springs Geothermal Area (Petersen, 1975) Geothermometry At...

  12. Noble Gas Geochemistry In Thermal Springs | Open Energy Information

    Open Energy Info (EERE)

    Noble Gas Geochemistry In Thermal Springs Abstract The composition of noble gases in both gas and water samples collected from Horseshoe Spring, Yellowstone National Park, was...

  13. Big Bend Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Big Bend Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Big Bend Hot Springs Geothermal Area Contents 1 Area Overview 2 History and...

  14. Big Creek Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Big Creek Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Big Creek Hot Springs Geothermal Area Contents 1 Area Overview 2 History and...

  15. Confederated Tribes of the Warm Springs Reservation- 2007 Wind Project

    Broader source: Energy.gov [DOE]

    Warm Springs Power and Water Enterprises (WSPWE) is a corporate entity owned by the Confederated Tribes of the Warm Springs Reservation, located in central Oregon.

  16. Baileys Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Baileys Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Baileys Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility...

  17. Symes Hotel and Medicinal Springs Pool & Spa Low Temperature...

    Open Energy Info (EERE)

    Symes Hotel and Medicinal Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Symes Hotel and Medicinal Springs Pool & Spa Low Temperature...

  18. Cove Hot Spring Greenhouse Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Cove Hot Spring Greenhouse Low Temperature Geothermal Facility Jump to: navigation, search Name Cove Hot Spring Greenhouse Low Temperature Geothermal Facility Facility Cove Hot...

  19. Chico Hot Springs Greenhouse Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Chico Hot Springs Greenhouse Low Temperature Geothermal Facility Jump to: navigation, search Name Chico Hot Springs Greenhouse Low Temperature Geothermal Facility Facility Chico...

  20. White Arrow Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    White Arrow Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home White Arrow Hot Springs Geothermal Area Contents 1 Area Overview 2 History and...

  1. White Licks Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    White Licks Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home White Licks Hot Springs Geothermal Area Contents 1 Area Overview 2 History and...

  2. White Sulphur Hot Springs Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name White Sulphur Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility White...

  3. Bagby Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Bagby Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Bagby Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Bagby...

  4. Ritter Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Ritter Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Ritter Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Ritter...

  5. Trimble Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Trimble Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Trimble Hot...

  6. Banbury Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Banbury Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Banbury Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility...

  7. Mystic Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Mystic Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Mystic Hot Springs Sector...

  8. Murphy Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Murphy Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Murphy Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Murphy...

  9. Orr Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Orr Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Orr Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Orr Hot...

  10. Chico Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Chico Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Chico Hot Springs Sector...

  11. Elkhorn Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Elkhorn Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Elkhorn Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility...

  12. Vichy Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Vichy Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Vichy Hot Springs Sector...

  13. Campbell Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Campbell Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Campbell...

  14. Circle Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Circle Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Circle Hot Springs Sector...

  15. Bozeman Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Bozeman Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Bozeman Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility...

  16. Dunton Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Dunton Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Dunton Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Dunton...

  17. Matilija Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Matilija Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Matilija Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility...

  18. Chena Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Chena Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Chena Hot Springs Sector...

  19. Mercey Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Mercey Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Mercey Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Mercey...

  20. Steamboat Villa Hot Springs Spa Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Villa Hot Springs Spa Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Steamboat Villa Hot Springs Spa Pool & Spa Low Temperature Geothermal Facility...

  1. Belknap Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Belknap Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Belknap Hot...

  2. Castle Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Castle Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Castle Hot...

  3. Crystal Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Crystal Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Crystal Hot...

  4. Austin Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Austin Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Austin Hot...

  5. Heise Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Heise Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Heise Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Heise...

  6. Downatta Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Downatta Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Downatta Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility...

  7. Steele Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Steele Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Steele Hot...

  8. Sierra Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Sierra Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Sierra Hot...

  9. Boulder Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Boulder Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Boulder Hot Springs...

  10. Mono Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Mono Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Mono Hot...

  11. Darrough Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Darrough Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Darrough Hot Springs...

  12. Roman Spa Hot Springs Resort Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Spa Hot Springs Resort Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Roman Spa Hot Springs Resort Pool & Spa Low Temperature Geothermal Facility...

  13. Tolovana Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Tolovana Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Tolovana Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility...

  14. Miracle Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Miracle Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Miracle Hot Springs...

  15. City of El Dorado Springs, Missouri (Utility Company) | Open...

    Open Energy Info (EERE)

    Springs, Missouri (Utility Company) Jump to: navigation, search Name: City of El Dorado Springs Place: Missouri Phone Number: 417-876-4821 or 417-876-2521 Website:...

  16. Jacumba Hot Springs Health Spa Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Jacumba Hot Springs Health Spa Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Jacumba Hot Springs Health Spa Pool & Spa Low Temperature Geothermal...

  17. Steamboat Springs Health and Rec. Pool & Spa Low Temperature...

    Open Energy Info (EERE)

    Springs Health and Rec. Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Steamboat Springs Health and Rec. Pool & Spa Low Temperature Geothermal...

  18. Kelly Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Kelly Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Kelly Hot Springs Geothermal Area Contents 1 Area Overview 2 History and...

  19. Kelly Hot Springs Aquaculture Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Kelly Hot Springs Aquaculture Low Temperature Geothermal Facility Jump to: navigation, search Name Kelly Hot Springs Aquaculture Low Temperature Geothermal Facility Facility Kelly...

  20. Ch. IV, A hydrogeochemical comparison of the Waunita Hot Springs...

    Open Energy Info (EERE)

    A hydrogeochemical comparison of the Waunita Hot Springs, Hortense, Castle Rock and Anderson Hot Springs Jump to: navigation, search OpenEI Reference LibraryAdd to library...

  1. Port Moller Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Port Moller Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Port Moller Hot Springs Geothermal Area Contents 1 Area Overview 2 History and...

  2. Sleeping Child Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Sleeping Child Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Sleeping Child Hot Springs Geothermal Area Contents 1 Area Overview 2...

  3. Crystal Crane Hot Springs Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Crystal Crane Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Crystal Crane Hot Springs Pool & Spa Low Temperature Geothermal Facility...

  4. Warner Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Warner Springs Pool & Spa Low Temperature Geothermal Facility Facility Warner Springs Sector...

  5. Warner Springs, California: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Springs, California: Energy Resources Jump to: navigation, search Name Warner Springs, California Equivalent URI DBpedia GeoNames ID 5407222 Coordinates 33.2822596,...

  6. Confederated Tribes of the Warm Springs Reservation- 2007 Project

    Broader source: Energy.gov [DOE]

    Warm Springs Power and Water Enterprises (WSPWE) is a corporate entity owned by the Confederated Tribes of the Warm Springs Reservation, located in central Oregon.

  7. Gila Hot Springs District Heating Low Temperature Geothermal...

    Open Energy Info (EERE)

    Low Temperature Geothermal Facility Facility Gila Hot Springs Sector Geothermal energy Type District Heating Location Gila Hot Springs, New Mexico Coordinates Show Map...

  8. Masson Radium Springs Farm Greenhouse Low Temperature Geothermal...

    Open Energy Info (EERE)

    Temperature Geothermal Facility Facility Masson Radium Springs Farm Sector Geothermal energy Type Greenhouse Location Radium Springs, New Mexico Coordinates 32.501453,...

  9. Valles Caldera - Sulphur Springs Geothermal Area | Open Energy...

    Open Energy Info (EERE)

    Valles Caldera - Sulphur Springs Geothermal Area (Redirected from Valles Caldera - Sulphur Springs Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Valles Caldera...

  10. GEOTHERMAL CASE STUDY: WAUNITA HOT SPRINGS, GUNNISON COUNTY,...

    Open Energy Info (EERE)

    GEOTHERMAL CASE STUDY: WAUNITA HOT SPRINGS, GUNNISON COUNTY, COLORADO Travis Brown and Kamran Bakhsh, Colorado School of Mines I. Details 1. Area Overview Waunita Hot Springs is...

  11. Valles Caldera - Sulphur Springs Geothermal Area | Open Energy...

    Open Energy Info (EERE)

    Valles Caldera - Sulphur Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Valles Caldera - Sulphur Springs Geothermal Area Contents 1 Area...

  12. Hunt's Ash Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Hunt's Ash Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Hunt's Ash Springs Pool & Spa Low Temperature Geothermal Facility Facility Hunt's...

  13. EIS-0500: Crystal Springs Hatchery Program; Bingham, Custer,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Crystal Springs Hatchery Program; Bingham, Custer, and Lemhi Counties, Idaho EIS-0500: Crystal Springs Hatchery Program; Bingham, Custer, and Lemhi Counties, Idaho Summary DOE's ...

  14. Reflection Survey At Neal Hot Springs Geothermal Area (Colwell...

    Open Energy Info (EERE)

    At Neal Hot Springs Geothermal Area (Colwell, Et Al., 2012) Exploration Activity Details Location Neal Hot Springs Geothermal Area Exploration Technique Reflection Survey Activity...

  15. Building America Spring 2012 Stakeholder Meeting Report: Austin...

    Energy Savers [EERE]

    Spring 2012 Stakeholder Meeting Report: Austin, Texas; February 29 - March 2, 2012 Building America Spring 2012 Stakeholder Meeting Report: Austin, Texas; February 29 - March 2, ...

  16. Pagosa Springs District Heating District Heating Low Temperature...

    Open Energy Info (EERE)

    Pagosa Springs District Heating District Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Pagosa Springs District Heating District Heating Low...

  17. Warm Springs Resort Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Warm Springs Resort Pool & Spa Low Temperature Geothermal Facility Facility Warm Springs Resort...

  18. Camas Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Camas Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Camas Hot...

  19. Glenwood Springs Vapor Caves Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Glenwood Springs Vapor Caves Pool & Spa Low Temperature Geothermal Facility Facility Glenwood Springs...

  20. Camperworld Hot Springs Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Camperworld Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Camperworld Hot Springs Pool & Spa Low Temperature Geothermal Facility...

  1. Saratoga Springs Resort Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Saratoga Springs Resort Pool & Spa Low Temperature Geothermal Facility Facility Saratoga Springs...

  2. Hobo Hot Springs Aquaculture Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Hobo Hot Springs Aquaculture Low Temperature Geothermal Facility Jump to: navigation, search Name Hobo Hot Springs Aquaculture Low Temperature Geothermal Facility Facility Hobo Hot...

  3. Neal Hot Springs Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Neal Hot Springs Geothermal Power Plant Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Neal Hot Springs Geothermal Power Plant General Information Name Neal Hot...

  4. Manley Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Manley Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Manley Hot Springs Sector...

  5. Radium Hot Springs Resort Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Radium Hot Springs Resort Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Radium Hot Springs Resort Pool & Spa Low Temperature Geothermal Facility...

  6. Indian Springs Resort Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Indian Springs Resort Pool & Spa Low Temperature Geothermal Facility Facility Indian Springs Resort...

  7. Carson Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Carson Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Carson Hot...

  8. Baumgartner Hot Springs Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Baumgartner Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Baumgartner Hot Springs Pool & Spa Low Temperature Geothermal Facility...

  9. Grover Hot Springs State Park Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Hot Springs State Park Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Grover Hot Springs State Park Pool & Spa Low Temperature Geothermal Facility...

  10. Twin Springs Resort Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Twin Springs Resort Pool & Spa Low Temperature Geothermal Facility Facility Twin Springs Resort...

  11. Weiser Hot Springs Greenhouse Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Hot Springs Greenhouse Low Temperature Geothermal Facility Jump to: navigation, search Name Weiser Hot Springs Greenhouse Low Temperature Geothermal Facility Facility Weiser Hot...

  12. Wilbur Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Wilbur Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Wilbur Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Wilbur...

  13. Lava Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Lava Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Lava Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Lava Hot...

  14. Hot Sulphur Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Hot Sulphur Springs Pool & Spa Low Temperature Geothermal Facility Facility Hot Sulphur Springs Sector...

  15. Harbin Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Harbin Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Harbin Hot...

  16. Burgdorf Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Burgdorf Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Burgdorf Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility...

  17. Avila Hot Springs Spa & RV Resort Pool & Spa Low Temperature...

    Open Energy Info (EERE)

    Avila Hot Springs Spa & RV Resort Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Avila Hot Springs Spa & RV Resort Pool & Spa Low Temperature...

  18. Hot Springs Soaking Pools Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Hot Springs Soaking Pools Pool & Spa Low Temperature Geothermal Facility Facility Hot Springs...

  19. Krotz Springs, Louisiana: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Krotz Springs, Louisiana: Energy Resources (Redirected from Krotz Springs, LA) Jump to: navigation, search Equivalent URI DBpedia Coordinates 30.5368592, -91.7528931 Show Map...

  20. Goldmeyer Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Goldmeyer Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Goldmeyer Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility...

  1. Hot Springs State Park Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Hot Springs State Park Pool & Spa Low Temperature Geothermal Facility Facility Hot Springs State...

  2. Waunita Hot Springs Ranch Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Waunita Hot Springs Ranch Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Waunita Hot Springs Ranch Pool & Spa Low Temperature Geothermal Facility...

  3. Saratoga Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Saratoga Springs Pool & Spa Low Temperature Geothermal Facility Facility Saratoga Springs Sector...

  4. Hot Springs Ranch Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Hot Springs Ranch Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Hot Springs Ranch Geothermal Area Contents 1 Area Overview 2 History and...

  5. Como Springs Resort Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Como Springs Resort Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Como Springs Resort Pool & Spa Low Temperature Geothermal Facility Facility Como...

  6. Jemez Springs Bathhouse Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Springs Bathhouse Sector Geothermal energy Type Pool and Spa Location Jemez Springs, New Mexico Coordinates 35.7686356, -106.692258 Show Map Loading map......

  7. Surface Gas Sampling At Jemez Springs Area (Goff & Janik, 2002...

    Open Energy Info (EERE)

    Jemez Springs Area (Goff & Janik, 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Surface Gas Sampling At Jemez Springs Area (Goff & Janik,...

  8. Isotopic Analysis- Fluid At Valles Caldera - Sulphur Springs...

    Open Energy Info (EERE)

    Activity: Isotopic Analysis- Fluid At Valles Caldera - Sulphur Springs Geothermal Area (Goff, Et Al., 1982) Exploration Activity Details Location Valles Caldera - Sulphur Springs...

  9. Isotopic Analysis- Fluid At Valles Caldera - Sulphur Springs...

    Open Energy Info (EERE)

    Activity: Isotopic Analysis- Fluid At Valles Caldera - Sulphur Springs Geothermal Area (Goff, Et Al., 1985) Exploration Activity Details Location Valles Caldera - Sulphur Springs...

  10. Compound and Elemental Analysis At Valles Caldera - Sulphur Springs...

    Open Energy Info (EERE)

    Compound and Elemental Analysis At Valles Caldera - Sulphur Springs Geothermal Area (Goff, Et Al., 1985) Exploration Activity Details Location Valles Caldera - Sulphur Springs...

  11. Hunters Hot Spring Space Heating Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Hot Spring Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Hunters Hot Spring Space Heating Low Temperature Geothermal Facility Facility Hunters...

  12. Manley Hot Springs Space Heating Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Manley Hot Springs Space Heating Low Temperature Geothermal Facility Facility Manley Hot Springs...

  13. Circle Hot Springs Space Heating Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Circle Hot Springs Space Heating Low Temperature Geothermal Facility Facility Circle Hot Springs...

  14. Desert Hot Springs Space Heating Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Springs Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Desert Hot Springs Space Heating Low Temperature Geothermal Facility Facility Desert Hot...

  15. Lava Hot Springs Space Heating Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Lava Hot Springs Space Heating Low Temperature Geothermal Facility Facility Lava Hot Springs...

  16. Medical Hot Springs Space Heating Low Temperature Geothermal...

    Open Energy Info (EERE)

    Medical Hot Springs Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Medical Hot Springs Space Heating Low Temperature Geothermal Facility...

  17. Broadwater Athletic Club & Hot Springs Space Heating Low Temperature...

    Open Energy Info (EERE)

    Broadwater Athletic Club & Hot Springs Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Broadwater Athletic Club & Hot Springs Space Heating Low...

  18. Cottonwood Hot Springs Space Heating Low Temperature Geothermal...

    Open Energy Info (EERE)

    Hot Springs Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Cottonwood Hot Springs Space Heating Low Temperature Geothermal Facility Facility...

  19. Tecopa Hot Springs Space Heating Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Tecopa Hot Springs Space Heating Low Temperature Geothermal Facility Facility Tecopa Hot Springs...

  20. Arrowhead Hot Springs Space Heating Low Temperature Geothermal...

    Open Energy Info (EERE)

    Hot Springs Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Arrowhead Hot Springs Space Heating Low Temperature Geothermal Facility Facility...

  1. Vichy Hot Springs Space Heating Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Vichy Hot Springs Space Heating Low Temperature Geothermal Facility Facility Vichy Hot Springs...

  2. White Sulphur Springs Space Heating Low Temperature Geothermal...

    Open Energy Info (EERE)

    Sulphur Springs Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name White Sulphur Springs Space Heating Low Temperature Geothermal Facility Facility...

  3. Twin Springs Resort Space Heating Low Temperature Geothermal...

    Open Energy Info (EERE)

    Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Twin Springs Resort Space Heating Low Temperature Geothermal Facility Facility Twin Springs...

  4. Chico Hot Springs Space Heating Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Chico Hot Springs Space Heating Low Temperature Geothermal Facility Facility Chico Hot Springs...

  5. Chena Hot Springs Space Heating Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Chena Hot Springs Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Chena Hot Springs Space Heating Low Temperature Geothermal Facility Facility...

  6. Breitenbush Hot Springs Space Heating Low Temperature Geothermal...

    Open Energy Info (EERE)

    Hot Springs Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Breitenbush Hot Springs Space Heating Low Temperature Geothermal Facility Facility...

  7. Pinkerton Hot Springs Space Heating Low Temperature Geothermal...

    Open Energy Info (EERE)

    Pinkerton Hot Springs Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Pinkerton Hot Springs Space Heating Low Temperature Geothermal Facility...

  8. Jemez Springs Space Heating Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Jemez Springs Space Heating Low Temperature Geothermal Facility Facility Jemez Springs Sector...

  9. Del Rio Hot Springs Space Heating Low Temperature Geothermal...

    Open Energy Info (EERE)

    Rio Hot Springs Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Del Rio Hot Springs Space Heating Low Temperature Geothermal Facility Facility...

  10. Miracle Hot Spring Space Heating Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Spring Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Miracle Hot Spring Space Heating Low Temperature Geothermal Facility Facility Miracle Hot...

  11. Radium Hot Springs Space Heating Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Radium Hot Springs Space Heating Low Temperature Geothermal Facility Facility Radium Hot Springs...

  12. Geronimo Springs Museum Space Heating Low Temperature Geothermal...

    Open Energy Info (EERE)

    Geronimo Springs Museum Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Geronimo Springs Museum Space Heating Low Temperature Geothermal Facility...

  13. Kaiser Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Kaiser Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Kaiser Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Kaiser...

  14. Brockway Springs Resort Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Brockway Springs Resort Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Brockway Springs Resort Pool & Spa Low Temperature Geothermal Facility...

  15. Silver Star Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Silver Star Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Silver Star Hot Springs Geothermal Area Contents 1 Area Overview 2 History and...

  16. Sol Duc Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Sol Duc Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Sol Duc Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Sol...

  17. Brady Hot Springs I Geothermal Facility | Open Energy Information

    Open Energy Info (EERE)

    I Geothermal Facility Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Brady Hot Springs I Geothermal Facility General Information Name Brady Hot Springs I Geothermal...

  18. Brady Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Brady Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Brady Hot Springs Geothermal Area Contents 1 Area Overview 2 History and...

  19. Magnetotellurics At Brady Hot Springs Area (Combs 2006) | Open...

    Open Energy Info (EERE)

    Brady Hot Springs Area (Combs 2006) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Magnetotellurics At Brady Hot Springs Area (Combs 2006)...

  20. Gas Flux Sampling At Steamboat Springs Area (Lechler And Coolbaugh...

    Open Energy Info (EERE)

    Steamboat Springs Area (Lechler And Coolbaugh, 2007) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Gas Flux Sampling At Steamboat Springs Area...

  1. Aerial Photography At Brady Hot Springs Area (Wesnousky, Et Al...

    Open Energy Info (EERE)

    Brady Hot Springs Area (Wesnousky, Et Al., 2003) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Aerial Photography At Brady Hot Springs Area...

  2. Micro-Earthquake At Brady Hot Springs Geothermal Area (2011)...

    Open Energy Info (EERE)

    At Brady Hot Springs Geothermal Area (2011) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Brady Hot Springs Geothermal Area...

  3. Direct-Current Resistivity Survey At Brady Hot Springs Area ...

    Open Energy Info (EERE)

    Brady Hot Springs Area (Combs 2006) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current Resistivity Survey At Brady Hot Springs Area...

  4. Pilgrim Hot Springs Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    Pilgrim Hot Springs Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Pilgrim Hot Springs Geothermal Project Project Location...

  5. Pilgrim Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Pilgrim Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Pilgrim Hot Springs Geothermal Area Contents 1 Area Overview 2 History and...

  6. Thermal Gradient Holes At Pilgrim Hot Springs Area (DOE GTP)...

    Open Energy Info (EERE)

    Pilgrim Hot Springs Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Thermal Gradient Holes At Pilgrim Hot Springs Area (DOE GTP)...

  7. Lehman Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Lehman Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Lehman Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Lehman...

  8. Spring Forward: Top Strategies for Growing and Scaling Your Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Spring Forward: Top Strategies for Growing and Scaling Your Program (301) Spring Forward: Top Strategies for Growing and Scaling Your Program (301) May 2

  9. Horse Creek Hot Spring Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Creek Hot Spring Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Horse Creek Hot Spring Pool & Spa Low Temperature Geothermal Facility Facility...

  10. Donlay Ranch Hot Spring Greenhouse Low Temperature Geothermal...

    Open Energy Info (EERE)

    Donlay Ranch Hot Spring Greenhouse Low Temperature Geothermal Facility Jump to: navigation, search Name Donlay Ranch Hot Spring Greenhouse Low Temperature Geothermal Facility...

  11. Broadwater Hot Spring Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Broadwater Hot Spring Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Broadwater Hot Spring Geothermal Area Contents 1 Area Overview 2 History and...

  12. Reed River Hot Spring Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Reed River Hot Spring Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Reed River Hot Spring Geothermal Area Contents 1 Area Overview 2 History and...

  13. Bear Trap Hot Spring Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Trap Hot Spring Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Bear Trap Hot Spring Pool & Spa Low Temperature Geothermal Facility Facility Bear...

  14. Salmon Hot Spring Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Hot Spring Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Salmon Hot Spring Pool & Spa Low Temperature Geothermal Facility Facility Salmon Hot...

  15. Sitka Hot Spring Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Sitka Hot Spring Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Sitka Hot Spring Geothermal Area Contents 1 Area Overview 2 History and Infrastructure...

  16. Sand Dunes Hot Spring Aquaculture Low Temperature Geothermal...

    Open Energy Info (EERE)

    Dunes Hot Spring Aquaculture Low Temperature Geothermal Facility Jump to: navigation, search Name Sand Dunes Hot Spring Aquaculture Low Temperature Geothermal Facility Facility...

  17. Ishtalitna Hot Spring Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Ishtalitna Hot Spring Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Ishtalitna Hot Spring Geothermal Area Contents 1 Area Overview 2 History and...

  18. Bradfield Canal Hot Spring Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Bradfield Canal Hot Spring Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Bradfield Canal Hot Spring Geothermal Area Contents 1 Area Overview 2...

  19. Granite Creek Hot Spring Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Creek Hot Spring Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Granite Creek Hot Spring Pool & Spa Low Temperature Geothermal Facility Facility...

  20. Spring high school internship application is open | Princeton...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Spring high school internship application is open September 4, 2015 Apply by November 30 The application for PPPL's spring high school internship is open Click here for more...

  1. Challis Hot Spring Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Challis Hot Spring Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Challis Hot Spring Pool & Spa Low Temperature Geothermal Facility Facility...

  2. Alive Polarity's Murrietta Hot Spring Pool & Spa Low Temperature...

    Open Energy Info (EERE)

    Alive Polarity's Murrietta Hot Spring Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Alive Polarity's Murrietta Hot Spring Pool & Spa Low...

  3. River Inn Natural Hot Spring Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Inn Natural Hot Spring Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name River Inn Natural Hot Spring Pool & Spa Low Temperature Geothermal Facility...

  4. Broadwater Hot Spring Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Hot Spring Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Broadwater Hot Spring Pool & Spa Low Temperature Geothermal Facility Facility Broadwater...

  5. Cold Bay Hot Spring Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Cold Bay Hot Spring Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Cold Bay Hot Spring Geothermal Area Contents 1 Area Overview 2 History and...

  6. Hunter Hot Spring Greenhouse Greenhouse Low Temperature Geothermal...

    Open Energy Info (EERE)

    Hunter Hot Spring Greenhouse Greenhouse Low Temperature Geothermal Facility Jump to: navigation, search Name Hunter Hot Spring Greenhouse Greenhouse Low Temperature Geothermal...

  7. Dann Ranch Hot Spring Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Dann Ranch Hot Spring Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Dann Ranch Hot Spring Geothermal Area Contents 1 Area Overview 2 History and...

  8. Upper Division Hot Spring Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Upper Division Hot Spring Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Upper Division Hot Spring Geothermal Area Contents 1 Area Overview 2 History...

  9. Fisher Hot Spring Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Fisher Hot Spring Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Fisher Hot Spring Geothermal Area Contents 1 Area Overview 2 History and...

  10. Macfarlane's Hot Spring Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Macfarlane's Hot Spring Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Macfarlane's Hot Spring Geothermal Area Contents 1 Area Overview 2 History and...

  11. Red River Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Red River Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Red River Hot Springs Geothermal Area Contents 1 Area Overview 2 History and...

  12. Town of Red Springs, North Carolina (Utility Company) | Open...

    Open Energy Info (EERE)

    Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Town of Red Springs, North Carolina (Utility Company) Jump to: navigation, search Name: Red Springs...

  13. Red River Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Red River Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Red River Hot...

  14. Great Boiling Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Great Boiling Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Great Boiling Springs Geothermal Area Contents 1 Area Overview 2 History and...

  15. Crump's Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Survey GTP ARRA Spreadsheet Ground Magnetics At Crump's Hot Springs Area (DOE GTP) Ground Magnetics GTP ARRA Spreadsheet Reflection Survey At Crump's Hot Springs Area (DOE...

  16. City of Soda Springs, Idaho (Utility Company) | Open Energy Informatio...

    Open Energy Info (EERE)

    Soda Springs, Idaho (Utility Company) Jump to: navigation, search Name: City of Soda Springs Place: Idaho Phone Number: (208) 547-2600 Website: www.sodaspringsid.comindex.as...

  17. City of Colorado Springs, Colorado (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    from Colorado Springs Utilities) Jump to: navigation, search Name: Colorado Springs City of Place: Colorado Phone Number: 719-448-4800 Website: www.csu.orgPagesresidential....

  18. Auburn Hot Spring Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Hot Spring Pool & Spa Low Temperature Geothermal Facility Facility Auburn Hot Spring Sector Geothermal energy Type Pool and Spa Location Auburn, Wyoming Coordinates...

  19. Aeromagnetic Survey At Baltazor Hot Springs Area (Isherwood ...

    Open Energy Info (EERE)

    local magnetic low associated with the spring. This low could reflect destruction of magnetite related to hydrothermal alteration in the vicinity of the spring. References W. F....

  20. Bald Mountain Hot Springs Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Bald Mountain Hot Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Bald Mountain Hot Springs Pool & Spa Low Temperature Geothermal Facility...

  1. Spring 2013 Composite Data Products - Backup Power

    SciTech Connect (OSTI)

    Kurtz, J.; Wipke, K.; Sprik, S.; Ramsden, T.; Ainscough, C.; Saur, G.; Post, M.; Peters, M.

    2013-05-01

    This presentation from the U.S. Department of Energy's National Renewable Energy Laboratory includes 21 composite data products (CDPs) produced in Spring 2013 for fuel cell backup power systems.

  2. Colorado thermal spring water geothermometry (public dataset...

    Open Energy Info (EERE)

    chemical geothermometers for Colorado thermal springs. Data citations include Barrett, J. K. and Pearl, R. H. (1976), George, R. D., Curtis, H. A., Lester, O. C., Crook, J. K.,...

  3. Colorado Springs Utilities- Renewable Energy Rebate Program

    Broader source: Energy.gov [DOE]

    Through its Renewable Energy Rebate Program, Colorado Springs Utilities (CSU) offers a rebate to customers who install grid-connected solar-electric (photovoltaic, or PV) systems and solar water ...

  4. Mineral Springs of Alaska | Open Energy Information

    Open Energy Info (EERE)

    these springs during the field season of 1915, and the present report is an account of field work done in that year between June 15 and September 4. Authors Gerald Ashley...

  5. Colorado Springs Utilities- Builder Incentive Program

    Broader source: Energy.gov [DOE]

    The Colorado Springs Utilities (CSU) Energy Efficient Builder Program offers an incentive to builders who construct ENERGY STAR qualified homes within the CSU service area. The incentives range up...

  6. ARM - Field Campaign - Spring UAV Campaign

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    govCampaignsSpring UAV Campaign Campaign Links ARM UAV Program Science Plan ARM Data Discovery Browse Data Comments? We would love to hear from you Send us a note below or call us...

  7. ARM - Field Campaign - Spring 1994 UAV IOP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    govCampaignsSpring 1994 UAV IOP Campaign Links ARM UAV Program Image Library Science Plan ARM Data Discovery Browse Data Comments? We would love to hear from you Send us a note...

  8. ARM - Field Campaign - Spring SCM IOP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to hear from you Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : Spring SCM IOP 1998.04.27 - 1998.05.17 Lead Scientist : David Randall For data sets, see...

  9. Insights into Spring 2008 Gasoline Prices

    Reports and Publications (EIA)

    2008-01-01

    Gasoline prices rose rapidly in spring 2007 due a variety of factors, including refinery outages and lower than expected imports. This report explores those factors and looks at the implications for 2008.

  10. Spring O&M Users Group Meeting

    Broader source: Energy.gov [DOE]

    The spring 2015 UVIG O&M User Group meeting will feature a plenary session focused on blade inspection best practices.  The UVIG membership will hear presentations from:

  11. Pagosa Springs geothermal project. Final technical report

    SciTech Connect (OSTI)

    Not Available

    1984-10-19

    This booklet discusses some ideas and methods for using Colorado geothermal energy. A project installed in Pagosa Springs, which consists of a pipeline laid down 8th street with service to residences retrofitted to geothermal space heating, is described. (ACR)

  12. Residential Energy Efficiency Stakeholder Meeting - Spring 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Residential Buildings » Building America » Residential Energy Efficiency Stakeholder Meeting - Spring 2012 Residential Energy Efficiency Stakeholder Meeting - Spring 2012 The U.S. Department of Energy (DOE) Building America program held the second annual Residential Energy Efficiency Stakeholder Meeting on February 29-March 2, 2012, in Austin, Texas. At this meeting, hundreds of building industry professionals came together to share their perspective on the most

  13. Site Feeds - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Feeds Site Feeds Calendar Hanford Blog Archive Search Site Feeds Site Index Weather What's New Hanford RSS Feeds Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size RSS Feed Links Site News RSS Did You Know RSS What's New RSS Event Calendar RSS Recent Videos RSS Press Releases RSS What is a feed? A feed is a document that contains summaries of web content with web links to the original versions. It may be viewed with a feed reader or news aggregator. If you

  14. Program Update: 2nd Quarter 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Program Update: 2nd Quarter 2012 Inside this Update: U.S. Representative Scott Tipton Visits Grand Junction Facility; LM Management and Staff Tour the Weldon Spring Site Joined by Under Secretary Thomas P. D Agostino; DOE Awards the S.M. Stoller Corporation LMS Team with VPP Star Status; Chronic Beryllium Disease Awareness Website for DOE Federal and Contractor Workers; The Study of Natural Contamination; LM Business Center Activities, Services Stressed During DOE Conference; Pinellas

  15. Spring 2013 National Transportation Stakeholders Forum Meeting, New York |

    Energy Savers [EERE]

    Department of Energy National Transportation Stakeholders Forum » Spring 2013 National Transportation Stakeholders Forum Meeting, New York Spring 2013 National Transportation Stakeholders Forum Meeting, New York Spring 2013 National Transportation Stakeholders Forum Meeting, New York Save the Date NTSF Registration Announcement NTSF 2013 Agenda EM's Huizenga Gives Keynote Address at National Transportation Stakeholders Forum Spring 2013 NTSF Presentations May 14, 2013 Presentations

  16. Alaska Energy Pioneer Spring 2016 Newsletter | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Spring 2016 Newsletter Alaska Energy Pioneer Spring 2016 Newsletter The U.S. Department of Energy Office of Indian Energy's Alaska Energy Pioneer Spring 2016 newsletter highlights opportunities and actions to accelerate Alaska Native energy development. PDF icon Alaska Energy Pioneer - Spring 2016 More Documents & Publications Alaska Energy Pioneer Summer 2015 Newsletter 2015 Alaska Project Development and Finance Workshop Agenda and Presentations

  17. Industrial Assessment Centers Quarterly Update, Spring 2014 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Assessment Centers Quarterly Update, Spring 2014 Industrial Assessment Centers Quarterly Update, Spring 2014 Read the Industrial Assessment Centers (IAC) Quarterly Update -- Spring 2014 PDF icon Industrial Assessment Centers (IAC) Quarterly Update -- Spring 2014 More Documents & Publications Industrial Assessment Centers (IAC) Update -- July 2015 Industrial Assessment Centers Update, Fall 2015 IAC Factsheet

  18. Fish Health Studies Associated with the Kingston Fly Ash Spill, Spring 2009 - Fall 2010

    SciTech Connect (OSTI)

    Adams, Marshall; Fortner, Allison M

    2012-05-01

    On December 22, 2008, over 4 million cubic meters of fly ash slurry was released into the Emory River when a dike surrounding a solid waste containment area at the Tennessee Valley Authority's (TVA) Kingston Fossil Plant ruptured. One component of TVA's response to the spill is a biological monitoring program to assess short- and long-term ecological responses to the ash and associated chemicals, including studies on fish health and contaminant bioaccumulation. These studies were initiated in early Spring 2009 for the purposes of: (1) documenting the levels of fly ash-associated metals in various tissues of representative sentinel fish species in the area of the fly ash spill, (2) determining if exposure to fly ash-associated metals causes short, intermediate, or long-term health effects on these sentinel fish species, (3) assessing if there are causal relationships between exposure to metals and health effects on fish, (4) evaluating, along with information from other ecological and physicochemical studies, the nature and route of contaminant transfer though food chains into higher level consumers, (5) providing important information for the Ecological Risk Assessment (ERA) for the Kingston fly ash project, and (6) serving as an important technology information transfer or model study focused on how to best evaluate the environmental effects of fly ash (and related environmental stressors), not only at the Kingston site, but also at sites on other aquatic systems where coal-fired generating stations are located. This report presents the results of the first two years of the fish health study. To date, fish health and bioaccumulation studies have been conducted from Spring 2009 though Fall 2011 and includes 6 seasonal studies: Spring 2009, Fall 2009, Spring 2010, Fall 2010, Spring 2011, and Fall 2011. Both the Spring and Fall studies have focused on 3-4 sentinel fish species that represent different feeding habits, behaviors, and home ranges. In addition to fish health and bioaccumulation, the Spring investigations also included reproductive integrity studies on the same fish used for bioaccumulation and fish health. In this report, results of the fish health studies from Spring 2009 through Fall 2010 are presented while an associated report will present the fish reproductive studies conducted during Spring 2009 and Spring 2010. A report on fish bioaccumulation was submitted to TVA in June 2011. The fish health study conducted in conjunction with the bioaccumulation and reproductive study is critical for assessing and evaluating possible causal relationships between contaminant exposure (bioaccumulation) and the response of fish to exposure as reflected by the various measurements of fish health.

  19. Environmental assessment for Kelley Hot Spring geothermal project: Kelley Hot Spring Agricultural Center

    SciTech Connect (OSTI)

    Neilson, J.A.

    1981-04-01

    The environmental impacts of an integrated swine production unit are analyzed together with necessary ancillary operations deriving its primary energy from a known geothermal reservoir in accordance with policies established by the National Energy Conservation Act. This environmental assessment covers 6 areas designated as potentially feasible project sites, using as the basic criteria for selection ground, surface and geothermal water supplies. The six areas, comprising +- 150 acres each, are within a 2 mile radius of Kelley Hot Springs, a known geothermal resource of many centuries standing, located 16 miles west of Alturas, the county seat of Modoc County, California. The project consists of the construction and operation of a 1360 sow confined pork production complex expandable to 5440 sows. The farrow to finish system for 1360 sows consists of 2 breeding barns, 2 gestation barns, 1 farrowing and 1 nursery barn, 3 growing and 3 finishing barns, a feed mill, a methane generator for waste disposal and water storage ponds. Supporting this are one geothermal well and 1 or 2 cold water wells, all occupying approximately 12 acres. Environmental reconnaissance involving geology, hydrology, soils, vegetation, fauna, air and water quality, socioeconomic, archaelogical and historical, and land use aspects were carefully carried out, impacts assessed and mitigations evaluated.

  20. Micrometeorological data for energy-budget studies near Rogers Spring, Ash Meadows National Wildlife Refuge, Nye County, Nevada, 1994

    SciTech Connect (OSTI)

    Nichols, W.D.; Rapp, T.R.

    1996-05-01

    The data were collected at two sites near Rogers Spring for use in energy-budget studies beginning in 1994. The data collected at each site included net radiation, air temperature at two heights, dew- point temperature at two heights, windspeed at two heights, soil heat flux, and soil temperature in the interval between the land surface and the buried heat-flux plates.