Powered by Deep Web Technologies
Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Gas supplies of interstate natural gas pipeline companies, 1986  

SciTech Connect

The publication provides information on the total reserves, production, and deliverability capabilities of the 90 interstate pipeline companies. The gas supplies of interstate pipeline companies consist of the certificated, dedicated, recoverable, salable natural gas available from domestic in-the-ground reserves; gas purchased under contracts with other interstate pipeline companies; domestically produced coal gas, liquefied natural gas (LNG), and synthetic natural gas (SNG); and imported natural gas and LNG. The domestic in-the-ground reserves consist of company-owned reserves including natural gas in underground storage, reserves dedicated to or warranted under contracts with independent producers, and supplemental or short-term supplies purchased from independent producers and intrastate pipeline companies. To avoid duplicate reporting of domestic in-the-ground reserves, the volumes of gas under contract agreement between jurisdictional pipelines have been excluded in summarizing State and national reserves. Volumes contracted under agreements with foreign suppliers include pipeline imports from Canada and Mexico. 7 figs., 18 tabs.

Not Available

1987-12-18T23:59:59.000Z

2

EIA - Natural Gas Pipeline Network - Natural Gas Supply Basins...  

Annual Energy Outlook 2012 (EIA)

with selected updates U.S. Natural Gas Supply Basins Relative to Major Natural Gas Pipeline Transportation Corridors, 2008 U.S. Natural Gas Transporation Corridors out of Major...

3

Supplying Water Social Studies  

NLE Websites -- All DOE Office Websites (Extended Search)

Handbook of Engaged Learning Projects SUPPLYING OUR WATER NEEDS: Africa Project Summary Scenario Student Pages References Index SubjectContent Area: World CulturesSocial Studies...

4

Gas supplies of interstate natural gas pipeline companies 1985  

SciTech Connect

This publication provides information on the total reserves, production, and deliverability capabilities of the 91 interstate pipeline companies. The gas supplies of interstate pipeline companies consist of the certificated, dedicated, recoverable, salable natural gas available from domestic in-the-ground reserves; gas purchased under contracts with other interstate pipeline companies; domestically produced coal gas, liquefied natural gas (LNG), and synthetic natural gas (SNG); and imported natural gas and LNG. The domestic in-the-ground reserves consist of company owned reserves including natural gas in underground storage, reserves dedicated to or warranted under contracts with independent producers, and supplemental or short-term supplies purchased from independent producers and intrastate pipeline companies. To avoid duplicate reporting of domestic in-the-ground reserves, the volumes of gas under contract agreement between jurisdictional pipelines have been excluded in summarizing state and national reserves. Volumes contracted under agreements with foreign suppliers include pipeline imports from Canada and Mexico and LNG from Algeria. 7 figs., 18 tabs.

Not Available

1986-11-14T23:59:59.000Z

5

Gas supplies of interstate natural gas pipeline companies, 1984  

SciTech Connect

This publication provides information on the total reserves, production, and deliverability capabilities of 89 interstate pipeline companies. The gas supplies of interstate pipeline companies consist of the certificated, dedicated, recoverable, salable natural gas available from domestic in-the-ground reserves; gas purchased under contracts with other interstate pipeline companies; domestically produced coal gas, liquefied natural gas (LNG), and synthetic natural gas (SNG); and imported natural gas and LNG. The domestic in-the-ground reserves consist of company-owned reserves including natural gas in underground storage, reserves dedicated to or warranted under contracts with independent producers, and supplemental or short-term supplies purchased from independent producers and intrastate pipeline companies. To avoid duplicate reporting of domestic in-the-ground reserves, the volumes of gas under contract agreement between jurisdictional pipelines have been excluded in summarizing state and national reserves. Volumes contracted under agreements with foreign suppliers include pipeline imports from Canada and Mexico and LNG from Algeria. 8 figs., 18 tabs.

Price, R.

1985-12-04T23:59:59.000Z

6

Calculating Horsepower Requirements and Sizing Supply Pipelines for Irrigation  

E-Print Network (OSTI)

Pumping costs are often one of the largest single expenses in irrigated agriculture. This publication explains how to lower pumping costs by calculating horsepower requirements and sizing supply pipelines correctly. Examples take the reader through a step-by-step process. A special section deals with selecting PVC pipe.

Fipps, Guy

1995-09-05T23:59:59.000Z

7

Special Provisions Affecting Gas, Water, or Pipeline Companies...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Agencies You are here Home Savings Special Provisions Affecting Gas, Water, or Pipeline Companies (South Carolina) Special Provisions Affecting Gas, Water, or Pipeline...

8

Alternate Water Supply System  

Office of Legacy Management (LM)

Alternate Water Supply Alternate Water Supply System Flushing Report Riverton, Wyoming, Processing Site January 2008 Office of Legacy Management DOE M/1570 2008 - -L Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management U.S. Department of Energy This page intentionally left blank DOE-LM/1570-2008 Alternate Water Supply System Flushing Report Riverton, Wyoming, Processing Site January 2008 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado This page intentionally left blank

9

Hot water supply system  

SciTech Connect

A hot water supply system is described which consists of: a boiler having an exhaust; solar panels; and a frame supporting the solar panels and including a compartment beneath the solar panels, the boiler exhaust termining in the compartment beneath the solar panels, the boiler being within the compartment.

Piper, J.R.

1986-06-10T23:59:59.000Z

10

REGIONAL WATER SUPPLY PLANNING AND  

E-Print Network (OSTI)

accepted standards, which is an important planning aspect for water supply agencies. Yeh et al. (2000CHAPTER 3 REGIONAL WATER SUPPLY PLANNING AND CAPACITY EXPANSION MODELS Messele Z. Ejeta California Department of Water Resources Sacramento, California Larry W. Mays Department of Civil and Environmental

Mays, Larry W.

11

EIA - Natural Gas Pipeline Network - Natural Gas Supply Basins ...  

U.S. Energy Information Administration (EIA)

About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates

12

An Evaluation Of Large Diameter Steel Water Pipelines.  

E-Print Network (OSTI)

??Najafi, Mohammad Steel water pipelines, as a part of America's underground infrastructure, play a key role in maintaining the quality of life and well-being of… (more)

Joshi, Tushar

2013-01-01T23:59:59.000Z

13

Mapping hidden water pipelines using a mobile sensor droplet  

Science Conference Proceedings (OSTI)

This study presents several extensions to our previous work on the PipeProbe system, a mobile sensor system for identifying the spatial topology of hidden water pipelines (i.e., non-moldable pipes such as copper and PVC) behind walls or under floors ... Keywords: Wireless sensor networks, constraint satisfaction, mapping water pipeline, sensor inference

Ted Tsung-Te Lai; Wei-Ju Chen; Yu-Han Tiffany Chen; Polly Huang; Hao-Hau Chu

2013-03-01T23:59:59.000Z

14

PIPENETa wireless sensor network for pipeline monitoring  

Science Conference Proceedings (OSTI)

US water utilities are faced with mounting operational and maintenance costs as a result of aging pipeline infrastructures. Leaks and ruptures in water supply pipelines and blockages and overflow events in sewer collectors cost millions of dollars a ... Keywords: Intel mote platforms, pipeline monitoring, water supply systems, wireless sensor networks

Ivan Stoianov; Lama Nachman; Sam Madden; Timur Tokmouline

2007-04-01T23:59:59.000Z

15

Special Provisions Affecting Gas, Water, or Pipeline Companies (South Carolina)  

Energy.gov (U.S. Department of Energy (DOE))

This legislation confers the rights and privileges of telegraph and telephone companies (S.C. Code 58-9) on pipeline and water companies, and contains several additional provisions pertaining to...

16

Decontamination of Biological Threats in Water Supplies  

Science Conference Proceedings (OSTI)

Decontamination of Biological Threats in Water Supplies. ... The availability of safe pure drinking water in the United States is taken for granted. ...

2012-10-01T23:59:59.000Z

17

MHK Technologies/Deep Water Pipelines | Open Energy Information  

Open Energy Info (EERE)

Water Pipelines Water Pipelines < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Deep Water Pipelines.jpg Technology Profile Primary Organization Makai Ocean Engineering Inc Project(s) where this technology is utilized *MHK Projects/Modeling the Physical and Biochemical Influence of Ocean Thermal Energy Conversion Plant Discharges into their Adjacent Waters Technology Resource Click here Ocean Thermal Energy Conversion (OTEC) Technology Type Click here Closed-cycle Technology Readiness Level Click here TRL 5/6: System Integration and Technology Laboratory Demonstration Technology Description Examples include 24 pipe for Mini OTEC four 12 55 pipelines at Hawaii Natural Energy Laboratory with intakes from 2200 to 3000 deep used for OTEC research Significant work on 8 ft DoE pipeline in 1980s India OTEC pipe concept design in 1999 Developed gripper for novel OTEC Cold water pipe concept developed by Lockheed Martin Related technology of SeaWater Air Conditioning has resulted in five other subsea pipelines for Cornell University a resort in Bora Bora and Toronto saving 80 MW of air conditioning power

18

The Disinfection Efficacy of Chlorine on Sulfate-reducing Bacteria and Iron Bacteria in Water Supply Systems  

Science Conference Proceedings (OSTI)

Sulfate reducing bacteria (SRB) and iron reducing bacteria (IRB) that widely exist in water supply networks are the main microorganisms leading to metal corrosion in pipelines. Chlorine is widely used in drinking water supply systems for sterilization. ... Keywords: Chlorine, SRB, IRB, disinfection efficacy

Qi Beimenr; Wu Chenguang; Chen Xiaoju; Yuan Yixing

2012-05-01T23:59:59.000Z

19

Student Pages:Supplying Our Water Needs  

NLE Websites -- All DOE Office Websites (Extended Search)

Supplying Our Water Needs H2O Fish Kill Causes Water Emergency in Riverwood U.S. Army Corp of Engineers-Chicago District online Be sure to submit the online sign-off each day....

20

CLIMATE CHANGE AND WATER SUPPLY SECURITY  

E-Print Network (OSTI)

of developing the infrastructure to produce and deliver recycled water, so it seems logical and fair because unlike recycled water, the water produced is considered to be of drinking water quality or better CLIMATE CHANGE AND WATER SUPPLY SECURITY: Reconfiguring Groundwater Management to Reduce

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

SCADA system for monitoring water supply networks  

Science Conference Proceedings (OSTI)

Water supply represents a vital problem for people, and this imposes the need to know the information regarding consumptions, resources and production. This implies a continuous supervision of the water supply process in order to allow any problem that ... Keywords: PLCs, SCADA, analysis, control, data acquisition, data transmission, monitoring

Mircea Dobriceanu; Alexandru Bitoleanu; Mihaela Popescu; Sorin Enache; Eugen Subtirelu

2008-10-01T23:59:59.000Z

22

Reliable water supply system design under uncertainty  

Science Conference Proceedings (OSTI)

Given the natural variability and uncertainties in long-term predictions, reliability is a critical design factor for water supply systems. However, the large scale of the problem and the correlated nature of the involved uncertainties result in models ... Keywords: Data uncertainty, Robust optimization, Spatially correlated data, Water supply system

G. Chung; K. Lansey; G. Bayraksan

2009-04-01T23:59:59.000Z

23

New and Emerging Inspection Technologies for Service Water Pipelines  

Science Conference Proceedings (OSTI)

This document describes the Nondestructive Evaluation (NDE) technologies that are currently available or under development to help quantify the corrosion state of service water pipelines. The report classifies the technologies into above-ground and below-ground service. Further, it divides the techniques into those that require the pipe to be bare (lightly coated) and those that can measure through insulation or liners. Finally it presents the techniques that are best suited to perform a local metal loss...

1999-11-09T23:59:59.000Z

24

WATER AND GROWTH: FUTURE WATER SUPPLIES FOR  

E-Print Network (OSTI)

. Reclaimed Water As people use water, a wastewater stream is produced. Once cleaned to acceptable standards and is available as reclaimed water. #12;20 New growth in central Arizona will produce significant quantities to return for wastewater treatment51 . Of the reclaimed water produced, 30% is assumed available to meet

Gelt, Joe

25

Pipeline Operations Program (Louisiana)  

Energy.gov (U.S. Department of Energy (DOE))

The Pipeline Operations Program regulates the construction, acquisition, abandonment and interconnection of natural gas pipelines, as well as, the transportation and use of natural gas supplies.

26

A zero-crossing based pipelined analog-to-digital converter with supply voltage scalibility  

E-Print Network (OSTI)

A zero-crossing based pipelined analog-to-digital converter (ADC) has been designed and is fabricated in a 65nm CMOS process. The highly digital implementation characteristic of the zero-crossing detection technique enables ...

Lee, Sunghyuk

2010-01-01T23:59:59.000Z

27

A general water supply planning model: Evaluation of decentralized treatment  

Science Conference Proceedings (OSTI)

Increasing population, diminishing supplies and variable climatic conditions can cause difficulties in meeting water demands; especially in arid regions where water resources are limited. Given the complexity of the system and the interactions among ... Keywords: Decentralized wastewater treatment system, System dynamics, Water conservation, Water supply

G. Chung; K. Lansey; P. Blowers; P. Brooks; W. Ela; S. Stewart; P. Wilson

2008-07-01T23:59:59.000Z

28

VNG's Hampton Roads Pipeline Crossing  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VNG's Hampton Roads Pipeline Crossing VNG's Hampton Roads Pipeline Crossing FUPWG Conference Fall 2008 Williamsburg, Virginia Connection to DTI at Quantico Columbia Limitations South Hampton Roads served by a single pipeline Southside dependent on back up systems LNG Propane/air Two supply sources to VNG What if we connected pipelines? It would take Two Water Crossings Two Compressor Stations Construction in densely populated cities It could Deliver over 200,000 Dth of incremental supply Serve VNG, Columbia and Dominion customers ...we would get... Hampton Roads Crossing - HRX Hampton / Newport News Craney Island Norfolk 21 miles of 24" pipe 7 miles in Hampton/Newport News 4 miles in Norfolk 10 miles of water and island crossing 4 mile harbor crossing 4.5 miles on Craney

29

Quality and Membrane Treatability of the Lake Houston Water Supply  

E-Print Network (OSTI)

Currently, sections of Harris and Montgomery counties located North and Northeast of Houston use groundwater almost exclusively. These areas have witnessed substantial population growth and associated increases in water demand. In 1999 approximately 60% of potable water in Houston and its adjoining communities was produced from surface water. The remaining approximately 40% was derived from groundwater. However, the "Subsidence District" which is the authority responsible for granting groundwater permits has mandated that groundwater use needs to be decreased to 20% within the next few years so as to limit subsidence. Pipelines are not available to distribute purified water from the existing surface water treatment plants located in the South and East of Houston to the Northern areas that actually require additional water. Because Lake Houston is located in the geographical area of interest and is a surface water source, the City of Houston is interested in developing it for its future water needs. Additionally, a favorable hydraulic gradient exists from the Lake to the proposed service areas in Harris and Montgomery counties. Federal regulations such as the Stage II of the Disinfectant/Disinfection By-Products Rule (1) and the Enhanced Surface Water Treatment Rule (2) are expected to be promulgated in the near future. These rules are anticipated to introduce more stringent maximum contaminant levels (MCLs) for total trihalomethanes (THMs) and haloacetic acids (HAAs), possibly introduce new MCLs for individual species of THMs and HAAs, reduce turbidity levels, and enhance inactivation/removal requirements for Cryptosporidium. (Cryptosporidium was the causative protozoan for the more than 400,000 cases of acute gastrointestinal disease in Milwaukee, WI in March 1993.) The treatment processes in the City of Houston's existing water purification plants are not expected to be sufficient in meeting these anticipated regulations. Therefore, both regulatory requirements and engineering considerations point towards Lake Houston as an attractive surface water source for the next water purification plant to supply potable water to the City and its adjoining communities. However, water quality in Lake Houston can be characterized as being poor with high concentrations of turbidity, color, total organic carbon (TOC), nutrients such as phosphorus and nitrogen, etc. (3). Pressure-driven membrane processes can be employed as effective barriers against a wide range of contaminants including particles, turbidity, protozoan cysts and oocysts, bacteria, viruses, color, organic carbon, disinfection by-product (DBP) precursors, and dissolved metals. Additionally, microfiltration (MF) and ultrafiltration (UF) pretreatment may be necessary to reduce fouling rates and increase chemical cleaning intervals during surface water nanofiltration (NF) (4). Therefore, an integrated membrane system employing MF or UF pretreatment to NF is expected to be an important treatment candidate for Lake Houston water. Nanofiltration (NF) membranes typically operate at pressures less than 100 psi and are capable of high rejections of natural organic matter (NOM) and precursors to disinfection by-products (DBP) including trihalomethanes (THMs) and haloacetic acids (HAAs) (5-8), many of which are suspected carcinogens, mutagens, or teratogens.

Chellam, Shankar; Sharma, Ramesh; Shetty, Grishma; Wei, Ying

2001-10-01T23:59:59.000Z

30

Shock Chlorination of Stored Water Supplies  

E-Print Network (OSTI)

Treatment of drinking water to improve its sanitary or bacteriological quality is referred to as disinfection. Shock chlorination is one disinfection method employed by public suppliers to reduce bacterial contamination of water. This method also can be used by private-water-well owners.

Dozier, Monty; McFarland, Mark L.

2005-05-25T23:59:59.000Z

31

Shock Chlorination of Stored Water Supplies (Spanish)  

E-Print Network (OSTI)

Treatment of drinking water to improve its sanitary or bacteriological quality is referred to as disinfection. Shock chlorination is one disinfection method employed by public suppliers to reduce bacterial contamination of water. This method also can be used by private-water-well owners.

Dozier, Monty; McFarland, Mark L.

2005-05-25T23:59:59.000Z

32

Analysis of sustainable water supply options for Kuwait  

E-Print Network (OSTI)

This thesis considers several options for improving the sustainability of Kuwait's water supply system. The country currently relies heavily on desalination and brackish groundwater extraction. The options considered for ...

Murtaugh, Katharine A. (Katharine Ann)

2006-01-01T23:59:59.000Z

33

Web-Based and Geospatially Enabled Tool for Water and Wastewater Pipeline Infrastructure Risk Management.  

E-Print Network (OSTI)

??Advanced pipeline risk management is contingent on accurately locating the buried pipelines, the milieu, and also the physical condition of the pipelines. The web-based and… (more)

Sekar, Varun Raj

2011-01-01T23:59:59.000Z

34

Alaskan Ice Road Water Supplies Augmented by Snow Barriers  

NLE Websites -- All DOE Office Websites (Extended Search)

6, 2013 6, 2013 Alaskan Ice Road Water Supplies Augmented by Snow Barriers Washington, D.C. - In a project supported and managed by the Office of Fossil Energy's National Energy Technology Laboratory (NETL), researchers at the University of Alaska Fairbanks have demonstrated that the use of artificial barriers-snow fences-can significantly increase the amount of fresh water supplies in Arctic lakes at a fraction of the cost of bringing in water from nearby lakes. The results promise to enhance environmentally sound development of Alaska's natural resources, lowering the costs of building ice roads used for exploring for oil and natural gas in Alaska. They could also be used to help augment fresh water supplies at remote villages. Researcher Joel Bailey measures the density of the snow in this snow pit to determine the amount of snow in the drift and the water equivalent of the snow drift.

35

Water pollution: EPA controls over ballast water at Trans-Alaska Pipeline Marine Terminal  

SciTech Connect

The Alyeska Pipeline Service Company at Valdez, Alaska, operates a water treatment plant at the terminal to treat ballast water, oily sea water that is carried in tankers to provide stability, before it is discharged into the bay. The Environmental Protection Agency is nearly 4 years late in issuing a new permit to Alyeska which regulates the types and amounts of pollution that can be discharged. Alyeska has been operating under an extension of its old permit whose conditions may be less stringent than the new permit will require. Prior to 1984, EPA monitored Alyeska's permit and identified instances of noncompliance with permit conditions, but its enforcement actions were limited to discussions and correspondence with Alyeska. In contrast, since 1984, EPA has begun taking enforcement actions as well as investigating allegations of other environmental problems. EPA should have acted sooner and until the new permit is issued, questions about the protection of marine life and water quality in Valdez Bay will remain unanswered.

1987-01-01T23:59:59.000Z

36

Pipeline Flow Behavior of Water-In-Oil Emulsions.  

E-Print Network (OSTI)

??Water-in-oil (W/O) emulsions consist of water droplets dispersed in continuous oil phase. They are encountered at various stages of oil production. The oil produced from… (more)

Omer, Ali

2009-01-01T23:59:59.000Z

37

Project Summary:Supplying Our Water Needs  

NLE Websites -- All DOE Office Websites (Extended Search)

Subject/Content Area: Physical Science, Social Studies, Mathematics, and Subject/Content Area: Physical Science, Social Studies, Mathematics, and Learning Strategies Target Audience: Thornridge is a comprehensive high school serving approximately 2200 ninth through twelfth grade students living southeast of the Chicago city limits. Student backgrounds vary greatly socio-economically (below the poverty line to approximately six figures), ethnically (7% Caucasian, 87% African-American, 6% Hispanic) and culturally. Mobility and unemployment are high. Steel mills, the auto industry, steel processing plants and the construction trades have been the major employers, however, many no longer exist. Student test scores in all areas are below the state mean. Eighty freshmen, identified as performing well below grade-level in all areas, are targeted to use this water unit

38

Modeling threat assessments of water supply systems using markov latent effects methodology.  

SciTech Connect

Recent amendments to the Safe Drinking Water Act emphasize efforts toward safeguarding our nation's water supplies against attack and contamination. Specifically, the Public Health Security and Bioterrorism Preparedness and Response Act of 2002 established requirements for each community water system serving more than 3300 people to conduct an assessment of the vulnerability of its system to a terrorist attack or other intentional acts. Integral to evaluating system vulnerability is the threat assessment, which is the process by which the credibility of a threat is quantified. Unfortunately, full probabilistic assessment is generally not feasible, as there is insufficient experience and/or data to quantify the associated probabilities. For this reason, an alternative approach is proposed based on Markov Latent Effects (MLE) modeling, which provides a framework for quantifying imprecise subjective metrics through possibilistic or fuzzy mathematics. Here, an MLE model for water systems is developed and demonstrated to determine threat assessments for different scenarios identified by the assailant, asset, and means. Scenario assailants include terrorists, insiders, and vandals. Assets include a water treatment plant, water storage tank, node, pipeline, well, and a pump station. Means used in attacks include contamination (onsite chemicals, biological and chemical), explosives and vandalism. Results demonstrated highest threats are vandalism events and least likely events are those performed by a terrorist.

Silva, Consuelo Juanita

2006-12-01T23:59:59.000Z

39

Water Heating: Energy-efficient strategies for supplying hot water in the home (BTS Technology Fact Sheet)  

SciTech Connect

Fact sheet for homeowners and contractors on how to supply hot water in the home while saving energy.

NAHB Research Center; Southface Energy Institute; U.S. Department of Energy' s Oak Ridge Laboratory; U.S. Department of Energy' s National Renewable Energy Laboratory

2001-08-15T23:59:59.000Z

40

The Potential of Desalination as an Alternative Water Supply in the United States.  

E-Print Network (OSTI)

??Many parts of the United States are facing water shortages. Planners have to ensure that there will be an adequate water supply to meet the… (more)

Naini, Anjali Nina

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers  

E-Print Network (OSTI)

DRINKING WATER SUPPLY INDUSTRY An ENERGY STAR Resource Guidedrinking water supply industry to reduce energy consumptionenergy is used in the public drinking water supply industry.

Brown, Moya Melody, Camilla Dunham Whitehead, Rich

2011-01-01T23:59:59.000Z

42

GRR/Section 19-CO-f - Substitute Water Supply Plan | Open Energy  

Open Energy Info (EERE)

CO-f - Substitute Water Supply Plan CO-f - Substitute Water Supply Plan < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-CO-f - Substitute Water Supply Plan 19COFSubstituteWaterSupplyPlan.pdf Click to View Fullscreen Contact Agencies Colorado Division of Water Resources Regulations & Policies CRS 37-92-208 Policy 2003-2 Implementation of CRS 37-92-308 Regarding Substitute Water Supply Plans Triggers None specified Click "Edit With Form" above to add content 19COFSubstituteWaterSupplyPlan.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The state engineer in the Colorado Division of Water Resources oversees the

43

Analyzing water supply in future energy systems using the TIMES Integrated Assessment Model (TIAM-FR)  

E-Print Network (OSTI)

Analyzing water supply in future energy systems using the TIMES Integrated Assessment Model (TIAM is required to maintain water supplies while water is essential to produce energy. However, the models and energy generally dealt with them separately, the two resources are highly interconnected. Energy

44

Natural Gas Pipeline Research: Best Practices in Monitoring Technology  

E-Print Network (OSTI)

Natural Gas Pipeline Research: Best Practices in Monitoring Technology Energy Systems Research pipelines from outofstate supply basins located in the southwestern United States, the Rocky Mountains, and Canada. These pipelines run throughout the state, including underneath high population areas

45

The energy water nexus : increasing water supply by desalination integrated with renewable power and reducing water demand by corporate water footprinting.  

E-Print Network (OSTI)

??Growing populations and periodic drought conditions have exacerbated water stress in many areas worldwide. Consequently, it would be valuable to manage both supply and demand… (more)

Clayton, Mary Elizabeth

2013-01-01T23:59:59.000Z

46

Biogeochemical Behavior of Dissolved Arsenic and Uranium Concentrations in Public Water Supply Wells.  

E-Print Network (OSTI)

??Public water supply (PWS) wells currently contain dissolved uranium concentrations above the federally mandated maximum contaminant level (MCL) of 30 ppb (parts per billion) and… (more)

mcvey, kevin j

2009-01-01T23:59:59.000Z

47

The feasibility of desalination as an alternative means of water supply to Zinkwazi town.  

E-Print Network (OSTI)

??Desalination of seawater is a widely used technology throughout the world, but is not commonly used in South Africa for domestic water supply. The reasons… (more)

Metcalf, Graham James.

2005-01-01T23:59:59.000Z

48

Benthic Microbial Fuel Cell Persistent power supply for in-water ...  

Benthic Microbial Fuel Cell Persistent power supply for in-water sensors ... and high-density sensor arrays where the cost of battery replacement is high.

49

URBAN WATER SUPPLY IN INDIA: STATUS, REFORM OPTIONS AND POSSIBLE LESSONS  

E-Print Network (OSTI)

of water produced that does not reach water board customers. Unaccounted for water results both from for water accounts for 25-40% of water produced by utilities in the main urban areas in India. WhileURBAN WATER SUPPLY IN INDIA: STATUS, REFORM OPTIONS AND POSSIBLE LESSONS David McKenzie Development

Kammen, Daniel M.

50

CONCLUSIONS 1. The complexity, controversy, interdependence, and importance of California's water supply  

E-Print Network (OSTI)

(SWAP) and an elasticity-based urban water demand model, has produced preliminary estimates are produced. The willingness of water users to pay #12;154 for additional water and new facilities also of California's water supply system have grown to require new approaches to their analysis. California's water

Lund, Jay R.

51

Water supply analysis for restoring the Colorado River Delta, Mexico  

E-Print Network (OSTI)

to Pay for Additional Transboundary Water Flows from the US.2001). "Improving California Water Management: Optimizingloss functions to value urban water scarcity in California."

Medellin-Azuara, Josue; Lund, Jay R.; Howitt, Richard E.

2007-01-01T23:59:59.000Z

52

Pipeline Safety  

Science Conference Proceedings (OSTI)

Pipeline Safety. Summary: Our goal is to provide standard test methods and critical data to the pipeline industry to improve safety and reliability. ...

2012-11-13T23:59:59.000Z

53

A Low-Cost Natural Gas/Freshwater Aerial Pipeline  

E-Print Network (OSTI)

Offered is a new type of low-cost aerial pipeline for delivery of natural gas, an important industrial and residential fuel, and freshwater as well as other payloads over long distances. The offered pipeline dramatically decreases the construction and operation costs and the time necessary for pipeline construction. A dual-use type of freight pipeline can improve an arid rural environment landscape and provide a reliable energy supply for cities. Our aerial pipeline is a large, self-lofting flexible tube disposed at high altitude. Presently, the term "natural gas" lacks a precise technical definition, but the main components of natural gas are methane, which has a specific weight less than air. A lift force of one cubic meter of methane equals approximately 0.5 kg. The lightweight film flexible pipeline can be located in the Earth-atmosphere at high altitude and poses no threat to airplanes or the local environment. The authors also suggest using lift force of this pipeline in tandem with wing devices for cheap shipment of a various payloads (oil, coal and water) over long distances. The article contains a computed macroproject in northwest China for delivery of 24 billion cubic meter of gas and 23 millions tonnes of water annually.

Alexander Bolonkin; Richard Cathcart

2007-01-05T23:59:59.000Z

54

Program on Technology Innovation: Electric Efficiency Through Water Supply Technologies-- A Roadmap  

Science Conference Proceedings (OSTI)

Electricity consumption associated with sourcing, treating, and transporting water is expected to increase significantly in the future as a result of a growing population and an increasing need for alternative water supplies. Furthermore, there is a concern that climate change may necessitate an increase in irrigation in some areas of the United States. Consequently, there is a critical need for technologies that can reduce the electricity consumption associated with water supply. This report identifies ...

2009-06-18T23:59:59.000Z

55

EIA - Natural Gas Pipeline Network - Largest Natural Gas Pipeline Systems  

U.S. Energy Information Administration (EIA) Indexed Site

Interstate Pipelines Table Interstate Pipelines Table About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Thirty Largest U.S. Interstate Natural Gas Pipeline Systems, 2008 (Ranked by system capacity) Pipeline Name Market Regions Served Primary Supply Regions States in Which Pipeline Operates Transported in 2007 (million dekatherm)1 System Capacity (MMcf/d) 2 System Mileage Columbia Gas Transmission Co. Northeast Southwest, Appalachia DE, PA, MD, KY, NC, NJ, NY, OH, VA, WV 1,849 9,350 10,365 Transcontinental Gas Pipeline Co. Northeast, Southeast Southwest AL, GA, LA, MD, MS, NC, NY, SC, TX, VA, GM 2,670 8,466 10,450 Northern Natural Gas Co. Central, Midwest Southwest IA, IL, KS, NE, NM, OK, SD, TX, WI, GM 1,055 7,442 15,874 Texas Eastern Transmission Corp.

56

Sanitizing Stored Water Supplies R. Craig Runyan1  

E-Print Network (OSTI)

Publication date: September 2009. This publication is produced by the Southern Regional Water Program, scrubbing the interior tank walls with mild detergent can produce excellent results. Even when water stored quantities. Treatment of stored water using standard household bleach will usually produce good

57

Water Supplies to the Great Lakes—Reconstructed from Tree-Rings  

Science Conference Proceedings (OSTI)

Correlations between the water supplies to each of the Great Lakes and prewhitened tree-ring chronologies from 16 sites around the Great Lakes suggested some strong associations for the summer months, particularly June and July. Some of these ...

W. A. R. Brinkmann

1987-04-01T23:59:59.000Z

58

Planning for an Uncertain Future: Climate Change Sensitivity Assessment towards Adaptation Planning for Public Water Supply  

Science Conference Proceedings (OSTI)

Assessing climate change risk to municipal water supplies is often conducted by hydrologic modeling specific to local watersheds and infrastructure to ensure that outputs are compatible with existing planning frameworks and processes. This study ...

Tim Bardsley; Andrew Wood; Mike Hobbins; Tracie Kirkham; Laura Briefer; Jeff Niermeyer; Steven Burian

59

Opportunities for renewable energy technologies in water supply in developing country villages  

DOE Green Energy (OSTI)

This report provides the National Renewable Energy Laboratory (NREL) with information on village water supply programs in developing countries. The information is intended to help NREL develop renewable energy technologies for water supply and treatment that can be implemented, operated, and maintained by villagers. The report is also useful to manufacturers and suppliers in the renewable energy community in that it describes a methodology for introducing technologies to rural villages in developing countries.

Niewoehner, J.; Larson, R.; Azrag, E.; Hailu, T.; Horner, J.; VanArsdale, P. [Water for People, Denver, CO (United States)

1997-03-01T23:59:59.000Z

60

Determining energy requirement for future water supply and demand alternatives.  

E-Print Network (OSTI)

??Water and energy are two inextricably linked resources. Each has the potential to limit the development of the other. There is a substantial body of… (more)

Larsen, Sara Gaye

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Dry January lowers the Pacific Northwest water supply forecast ...  

U.S. Energy Information Administration (EIA)

Energy Information Administration ... most recent 2013 projections for April to September—typically the high hydro season—call for normal to below-normal water ...

62

Pipeline Morphing and Virtual Pipelines  

E-Print Network (OSTI)

Pipeline morphing is a simple but effectivetechnique for reconfiguring pipelined FPGA designs at run time. By overlapping computation and reconfiguration, the latency associated with emptying and refilling a pipeline can be avoided. Weshowhow morphing can be applied to linear and mesh pipelines at both word-level and bit-level, and explain how this method can be implemented using Xilinx 6200 FPGAs. We also present an approach using morphing to map a large virtual pipeline onto a small physical pipeline, and the trade-offs involved are discussed.

W. Luk; N. Shirazi; S. R. Guo; P. Y. K. Cheung

1997-01-01T23:59:59.000Z

63

Alaskan Ice Road Water Supplies Augmented by Snow Barriers | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaskan Ice Road Water Supplies Augmented by Snow Barriers Alaskan Ice Road Water Supplies Augmented by Snow Barriers Alaskan Ice Road Water Supplies Augmented by Snow Barriers March 6, 2013 - 10:55am Addthis Monitoring equipment and part of the snowfence peek out of the snow drift. Monitoring equipment and part of the snowfence peek out of the snow drift. The aerial view shows the experimental lake at Franklin Bluffs used for the snowfence experiment. The aerial view shows the experimental lake at Franklin Bluffs used for the snowfence experiment. Researcher Joel Bailey measures the density of the snow in this snow pit to determine the amount of snow in the drift and the water equivalent of the snow drift. Researcher Joel Bailey measures the density of the snow in this snow pit to determine the amount of snow in the drift and the water equivalent of the

64

Alaskan Ice Road Water Supplies Augmented by Snow Barriers | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaskan Ice Road Water Supplies Augmented by Snow Barriers Alaskan Ice Road Water Supplies Augmented by Snow Barriers Alaskan Ice Road Water Supplies Augmented by Snow Barriers March 6, 2013 - 10:55am Addthis Monitoring equipment and part of the snowfence peek out of the snow drift. Monitoring equipment and part of the snowfence peek out of the snow drift. The aerial view shows the experimental lake at Franklin Bluffs used for the snowfence experiment. The aerial view shows the experimental lake at Franklin Bluffs used for the snowfence experiment. Researcher Joel Bailey measures the density of the snow in this snow pit to determine the amount of snow in the drift and the water equivalent of the snow drift. Researcher Joel Bailey measures the density of the snow in this snow pit to determine the amount of snow in the drift and the water equivalent of the

65

Surface water supply for the Clearlake, California Hot Dry Rock Geothermal Project  

DOE Green Energy (OSTI)

It is proposed to construct a demonstration Hot Dry Rock (HDR) geothermal plant in the vicinity of the City of Clearlake. An interim evaluation has been made of the availability of surface water to supply the plant. The evaluation has required consideration of the likely water consumption of such a plant. It has also required consideration of population, land, and water uses in the drainage basins adjacent to Clear Lake, where the HDR demonstration project is likely to be located. Five sources were identified that appear to be able to supply water of suitable quality in adequate quantity for initial filling of the reservoir, and on a continuing basis, as makeup for water losses during operation. Those sources are California Cities Water Company, a municipal supplier to the City of Clearlake; Clear Lake, controlled by Yolo County Flood Control and Water Conservation District; Borax Lake, controlled by a local developer; Southeast Regional Wastewater Treatment Plant, controlled by Lake County; and wells, ponds, and streams on private land. The evaluation involved the water uses, water rights, stream flows, precipitation, evaporation, a water balance, and water quality. In spite of California`s prolonged drought, the interim conclusion is that adequate water is available at a reasonable cost to supply the proposed HDR demonstration project.

Jager, A.R.

1996-03-01T23:59:59.000Z

66

Water and Sustainability (Volume 4): U.S. Electricity Consumption for Water Supply and Treatment -- The Next Half Century  

Science Conference Proceedings (OSTI)

The fast growing demand for clean, fresh water -- coupled with the need to protect and enhance the environment -- has made many areas of the United States and the rest of the world vulnerable to water shortages for various human uses. As they interact with the electricity industry, these uses encompass agricultural irrigation, thermoelectric generation, municipal water/wastewater treatment and distribution, and industrial processes. The dependency of electricity supply and demand on water availability ca...

2002-03-01T23:59:59.000Z

67

Differential-drive in-pipe robot for moving inside urban gas pipelines  

Science Conference Proceedings (OSTI)

Pipelines for the urban gas-supply system require a robot possessing outstanding mobility and advanced control algorithms, since they are configured with various pipeline elements, such as straight pipelines, elbows, and branches. We present a comprehensive ...

Se-gon Roh; Hyouk Ryeol Choi

2005-02-01T23:59:59.000Z

68

Power-optimal pipelining in deep submicron technology  

Science Conference Proceedings (OSTI)

This paper explores the effectiveness of pipelining as a power saving tool, where the reduction in logic depth per stage is used to reduce supply voltage at a fixed clock frequency. We examine power-optimal pipelining in deep submicron technology, both ... Keywords: pipelining, power scaling, supply voltage reduction

Seongmoo Heo; Krste AsanoviC

2004-08-01T23:59:59.000Z

69

Active space heating and hot water supply with solar energy  

DOE Green Energy (OSTI)

Technical and economic assessments are given of solar water heaters, both circulating, and of air-based and liquid-based solar space heating systems. Both new and retrofit systems are considered. The technical status of flat-plate and evacuated tube collectors and of thermal storage is also covered. Non-technical factors are also briefly discussed, including the participants in the use of solar heat, incentives and deterrents. Policy implications are considered as regards acceleration of solar use, goals for solar use, means for achieving goals, and interaction of governments, suppliers, and users. Government actions are recommended. (LEW)

Karaki, S.; Loef, G. O.G.

1981-04-01T23:59:59.000Z

70

Energy Reduction in California Pipeline Operations  

E-Print Network (OSTI)

Energy Reduction in California Pipeline Operations Industrial/Agriculture/Water End-Use PIER The Issue Fluid pipelines operating in California transport gasoline, fuel oil, jet fuel, crude, other hydrocarbons, and water, all vital to the wellbeing of Californias economy. These pipelines are also

71

U.S. Water Demand, Supply and Allocation: Trends and Outlook  

E-Print Network (OSTI)

2007-R-3 Water is an essential resource in the U.S. economy. It plays a crucial role in supporting many economic activities and ensuring the quality of human life and the health of ecological systems. Despite this, the value of water may not be widely appreciated because only some water resources and water uses are easily visible or noticed while others are not. Among the Institute for Water Resources (IWR) Future Directions program activities are the identification of emerging water challenges and opportunities and the tactical engagement of U.S. Army Corps of Engineers (USACE) senior leaders on these issues. Such critical thinking is an essential prerequisite to strategy development and planning. IWR has developed this series of Water Resources Outlook papers, commissioned utilizing outside experts, to identify emerging issues and implications for the Nation. These issues and implications will be presented in the form of “provocation sessions ” with external and internal subject matter experts and stakeholders and will inform the USACE strategic planning process. U.S. Water Demand, Supply and Allocation: Trends and Outlook Given the overall importance of water, the long-term adequacy of water supply is a major national concern. This first in a series of Water Resources Outlook papers reviews future trends

Jack C. Kiefer, Ph.D.

2006-01-01T23:59:59.000Z

72

Towards the visualization of water supply system components with GPR images  

Science Conference Proceedings (OSTI)

We propose a methodological tool for examining the layout and revealing the concealed characteristics of urban water supply systems (WSS). For this purpose, we use underground images obtained with ground penetrating radar (GPR) as a method that does ... Keywords: Ground penetrating radar, Images processing and analysis, Pipe location, Signal processing

David Ayala-Cabrera; Manuel Herrera; Idel Montalvo; Rafael PéRez-GarcíA

2011-10-01T23:59:59.000Z

73

Finding of No Significant Impact for the Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement Cameron and Calcasieu Parishes, Louisiana  

SciTech Connect

DOE has prepared an Environmental Assessment (EA), DOE/EA-1497, for the proposed replacement of the existing 107 centimeter (cm) [42 inch (in)] 6.87 kilometer (km) [4.27 mile (mi)] raw water intake pipeline (RWIPL). This action is necessary to allow for continued, optimum operations at the West Hackberry facility (main site/facility). The EA described the proposed action (including action alternatives) and three alternatives to the proposed action. The EA evaluated only the potential environmental consequences of the proposed action (one action alternative), and Alternative 3, which consisted of the No Build Action that is required by 10 CFR 1021.321(c). Based on the analysis in DOE/EA-1497, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting humans or the natural environment within the meaning of the National Environmental Policy Act of 1969 (NEPA), 42 USC 4321 et seq. Therefore, an Environmental Impact Statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI). To further minimize impacts to environmental media, the DOE will also implement a Mitigation Action Plan (MAP) for this action. The MAP is included as Appendix F of this EA, which is appended to this FONSI. The Energy Policy and Conservation Act of 1975 (EPCA), as amended, authorizes the creation of the Strategic Petroleum Reserve (SPR) to store crude oil to reduce the United States' vulnerability to energy supply disruptions. Crude oil is stored in geologic formations, or salt domes, located under these facilities. The purpose of this proposed project is to construct a new RWIPL at the main site to replace the existing RWIPL which services this facility.

N /A

2004-08-31T23:59:59.000Z

74

Finding of No Significant Impact for the Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement Cameron and Calcasieu Parishes, Louisiana  

SciTech Connect

DOE has prepared an Environmental Assessment (EA), DOE/EA-1497, for the proposed replacement of the existing 107 centimeter (cm) [42 inch (in)] 6.87 kilometer (km) [4.27 mile (mi)] raw water intake pipeline (RWIPL). This action is necessary to allow for continued, optimum operations at the West Hackberry facility (main site/facility). The EA described the proposed action (including action alternatives) and three alternatives to the proposed action. The EA evaluated only the potential environmental consequences of the proposed action (one action alternative), and Alternative 3, which consisted of the No Build Action that is required by 10 CFR 1021.321(c). Based on the analysis in DOE/EA-1497, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting humans or the natural environment within the meaning of the National Environmental Policy Act of 1969 (NEPA), 42 USC 4321 et seq. Therefore, an Environmental Impact Statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI). To further minimize impacts to environmental media, the DOE will also implement a Mitigation Action Plan (MAP) for this action. The MAP is included as Appendix F of this EA, which is appended to this FONSI. The Energy Policy and Conservation Act of 1975 (EPCA), as amended, authorizes the creation of the Strategic Petroleum Reserve (SPR) to store crude oil to reduce the United States' vulnerability to energy supply disruptions. Crude oil is stored in geologic formations, or salt domes, located under these facilities. The purpose of this proposed project is to construct a new RWIPL at the main site to replace the existing RWIPL which services this facility.

2004-08-31T23:59:59.000Z

75

Agricultural implications of reduced water supplies in the Green and Upper Yellowstone River Basins  

Science Conference Proceedings (OSTI)

The growth of the energy sector in the energy-rich but water-restricted Western US has presented a potential conflict with the irrigated agricultural sector. This study measures the direct impacts on farm income and employment resulting from the transfer of water from agriculture to energy in two specific geographical areas - the Green and Upper Yellowstone River Basins. We used a linear programming model to evaluate the impacts of reduced water supplies. Through the use of regional multipliers, we expanded our analysis to include regional impacts. Volume I provides the major analysis of these impacts. Volume II provides further technical data.

Lansford, R. R.; Roach, F.; Gollehon, N. R.; Creel, B. J.

1982-02-01T23:59:59.000Z

76

Climate Change and Water Resources in California: The Cost of Conservation versus Supply Augmentation for the East Bay Municipal Utility District  

E-Print Network (OSTI)

2009-2040: aggressive water conservation and the enlargementrationing, recycled water, conservation, and supplementalwhile meetings its costs. Water conservation versus supply

Mourad, Bessma

2009-01-01T23:59:59.000Z

77

EIA - Natural Gas Pipeline Network - Combined Natural Gas Transportation  

U.S. Energy Information Administration (EIA) Indexed Site

Combined Natural Gas Transportation Maps Combined Natural Gas Transportation Maps About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates U.S. Natural Gas Pipeline Network Map of U.S. Natural Gas Pipeline Network Major Natural Gas Supply Basins Relative to Natural Gas Pipeline Transportation Corridors Map of Major Natural Gas Supply Basins Relative to Natural Gas Pipeline Transportation Corridors see related text enlarge see related text enlarge U.S. Regional Breakdown Map of U.S. Regional Breakout States (in Grey) Highly Dependent on Interstate Pipelines for Natural Gas Supplies Map of States (in Grey) Highly Dependent on Interstate Pipelines for Natural Gas Supplies

78

On Managing Texas Rural Water Supply Systems: A Socioeconomic Analysis and Quality Evaluation  

E-Print Network (OSTI)

Research Objectives The study reported here is aimed at evaluating the effectiveness of nonprofit, rural water supply corporations or water systems (hereafter referred to as RWSs) in Texas from a sociological perspective. Specifically, the study has attempted to: 1. Provide an overview of the organizational structure and functioning of RWSs, identifying their existing as well as emerging needs, problems, and suggested solutions. It explores socioeconomic characteristics and patterns of RWSs in Texas. It outlines a history of state and federal regulations and practices through which these systems are structured and actually function. 2. Evaluate the quality and effectiveness of the management of selected RWSs located in different geographical regions of Texas. The evaluation of effectiveness of systems is accomplished through a systematic set of procedures and techniques. These procedures are tested for reliability and validity through empirical data. In addition, the differential levels of program effectiveness of RWSs are elaborated upon by correlating them with relevant socioeconomic variables. 3. Indicate policy and research implications of data for dealing with the future of rural water systems. Expected Contributions The rural populations in the U.S. started experiencing steady increases during the 1970s and early 1980s (Goodwin et al., 1984). Although the rural population growth at the national level showed a few differential trends during mid to late 1980s (Figures 3 and 4 in Appendix A), the state of Texas registered a population influx in many nonmetropolitan areas during the last decade (U.S.D.A., 1990: 11). Overall, a significant portion of Texas' population still resides in rural areas (Texas Department of Water Resources, 1984: 7). However, it appears that a larger number of studies have focused on water-management related problems and issues for urban areas than those for rural communities in Texas (e.g., Knudson, 1986; Meier and Thorton, 1973; Murdock et al., 1988; Texas Department of Water Resources, 1985; Texas Water Development Board, 1990;1 and U.S. Army Corps of Engineers, 1989). While rural water problems have been examined carefully in several parts of the country, we could not find a single study in Texas systematically examining water-related needs and issues confronting rural communities. The need to study rural water supply has become even more important now because of the challenge faced by small community systems in complying with the provisions of the 1986 Safe Drinking Water Act (SDWA). These small systems, with their limited customer and revenue bases, will face formidable expense in installing new water treatment methods (Jensen, 1990; Long and Stukenberg, 1987: 38; Texas Water Development Board, 1990: 14). The present study is a timely probe into the phenomena of rural water supply. The study is aimed at developing and using a methodology to evaluate the program effectiveness of RWSs. In recent years, interest has mounted for employing the research techniques of social sciences in efforts to assess the effectiveness of public programs. The 1970s and 1980s, decades of rapid-paced growth of RWSs in Texas and elsewhere, were marked by the proliferation of public expenditures. The study uses a set of indicators to identify effectiveness and efficiency of rural water projects. Such measures for analysis and appraisal of these projects may contribute to more informed and intelligent planning for the future. The study is also expected to provide a critical probe and insight into an evaluation methodology that may be used in future studies investigating public programs. To this end, the research reported here is exploratory in nature and may set grounds for more critical studies in the area. The study, for example, develops a baseline against which to measure future changes and trend in rural water supplies in Texas as well as in other parts of the country. Organization of the Report The remaining three-section organ

Singh, R.N.

1991-05-01T23:59:59.000Z

79

Pipeline ADC Design Methodology  

E-Print Network (OSTI)

Scaling vs. R. Figure 4.8 Pipeline ADC Structures. Figure2.4 A Pipelined ADC. Figure 3.1 Pipeline ADC Transfer Curve.Modes (b) data latency in pipeline ADC Figure 3.3 Detailed

Zhao, Hui

2012-01-01T23:59:59.000Z

80

NIST MSQC Pipeline  

Science Conference Proceedings (OSTI)

NIST MSQC Pipeline. Software for Monitoring LC-MS Performance. ... Installation Instructions. 1. Download the latest NIST MSQC Pipeline release. ...

2013-07-17T23:59:59.000Z

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

A simulated investment analysis for a gas pipeline company  

Science Conference Proceedings (OSTI)

The supply and demand schedules for gas pipeline companies are probabilistic in form and dynamistic in nature. These factors, along with the other uncertainties associated with gas supply investment decisions, must be considered in order to properly ...

Hal Miller

1973-01-01T23:59:59.000Z

82

EIA - Natural Gas Pipeline System - Central Region  

U.S. Energy Information Administration (EIA) Indexed Site

Central Region Central Region About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Pipelines in the Central Region Overview | Domestic Gas | Exports | Regional Pipeline Companies & Links Overview Twenty-two interstate and at least thirteen intrastate natural gas pipeline companies (see Table below) operate in the Central Region (Colorado, Iowa, Kansas, Missouri, Montana, Nebraska, North Dakota, South Dakota, Utah, and Wyoming). Twelve interstate natural gas pipeline systems enter the region from the south and east while four enter from the north carrying Canadian supplies. The average utilization rates on those shipping Canadian natural gas tend to be higher than those carrying domestic supplies.

83

A study of the factors affecting the sustainability of community managed rural water supply schemes in Sri Lanka  

E-Print Network (OSTI)

Disparities in water supply coverage in urban and rural areas are high in developing countries, with rural coverage being much lower. The inability of governments to provide the service because of resource constraints, and ...

Amerasinghe, Nishanthi Manjula

2009-01-01T23:59:59.000Z

84

EIA - Natural Gas Pipeline Network - States Dependent on Interstate  

U.S. Energy Information Administration (EIA) Indexed Site

States Dependent on Interstate Pipelines States Dependent on Interstate Pipelines About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates States in grey which are at least 85% dependent on the interstate pipeline network for their natural gas supply are: New England - Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont Southeast - Florida, Georgia, North Carolina, South Carolina, Tennessee Northeast - Delaware, Maryland, New Jersey, New York, District of Columbia Midwest - Illinois, Indiana, Minnesota, Ohio, Wisconsin Central - Iowa, Missouri, Nebraska, South Dakota West - Arizona, California, Idaho, Nevada, Oregon, Washington Interstate Natural Gas Supply Dependency, 2007 Map: Interstate Natural Gas Supply Dependency

85

Climate change and water supply, management and use: A literature review  

SciTech Connect

There is evidence that atmospheric concentrations Of C0{sub 2}, tropospheric 0{sub 3}, and CH{sub 4}, among other gases that contribute to the greenhouse effect, have increased in recent decades, and that these changes may induce changes in global air temperatures and regional climate features in coming years. A literature review was conducted to sample the literature base on which our understanding of the water resource impacts of climate change rests. Water resource issues likely to be important include hydrologic response to climate change, the resilience of water supply systems to changing climatic and hydrologic conditions, and the effects of climate change on water quality and water uses (such as navigation and energy generation). A computer-assisted search of literature on the effects of climate change on these subjects was conducted. All studies were classified by type of paper (e.g., review, discussion, case study), region, water resource variable studied, and source of climate scenario. The resulting bibliography containing more than 200 references was largely annotated. Case studies of potential hydrologic impacts have been more common than studies of impacts on water management or water use, but this apparent research gap is decreasing. Case studies demonstrating methods of incorporating potential risks of climate change into water project planning and management have been performed. Considerable variability in regional coverage exists; the Great Lakes basin and California receive relatively more attention than such regions as New England and the Missouri River basin. General circulation model-based and hypothetical climate scenarios have been the dominant sources of climate scenarios used in case studies, although a variety of other methods for developing climate scenarios have been developed.

Chang, L.H.; Draves, J.D.; Hunsaker, C.T.

1992-05-01T23:59:59.000Z

86

Using Snow Fences to Augument Fresh Water Supplies in Shallow Arctic Lakes  

Science Conference Proceedings (OSTI)

This project was funded by the U.S. Department of Energy, National Energy Technology Laboratory (NETL) to address environmental research questions specifically related to Alaska?s oil and gas natural resources development. The focus of this project was on the environmental issues associated with allocation of water resources for construction of ice roads and ice pads. Earlier NETL projects showed that oil and gas exploration activities in the U.S. Arctic require large amounts of water for ice road and ice pad construction. Traditionally, lakes have been the source of freshwater for this purpose. The distinctive hydrological regime of northern lakes, caused by the presence of ice cover and permafrost, exerts influence on lake water availability in winter. Lakes are covered with ice from October to June, and there is often no water recharge of lakes until snowmelt in early June. After snowmelt, water volumes in the lakes decrease throughout the summer, when water loss due to evaporation is considerably greater than water gained from rainfall. This balance switches in August, when air temperature drops, evaporation decreases, and rain (or snow) is more likely to occur. Some of the summer surface storage deficit in the active layer and surface water bodies (lakes, ponds, wetlands) is recharged during this time. However, if the surface storage deficit is not replenished (for example, precipitation in the fall is low and near?surface soils are dry), lake recharge is directly affected, and water availability for the following winter is reduced. In this study, we used snow fences to augment fresh water supplies in shallow arctic lakes despite unfavorable natural conditions. We implemented snow?control practices to enhance snowdrift accumulation (greater snow water equivalent), which led to increased meltwater production and an extended melting season that resulted in lake recharge despite low precipitation during the years of the experiment. For three years (2009, 2010, and 2011), we selected and monitored two lakes with similar hydrological regimes. Both lakes are located 30 miles south of Prudhoe Bay, Alaska, near Franklin Bluffs. One is an experimental lake, where we installed a snow fence; the other is a control lake, where the natural regime was preserved. The general approach was to compare the hydrologic response of the lake to the snowdrift during the summers of 2010 and 2011 against the ?baseline? conditions in 2009. Highlights of the project included new data on snow transport rates on the Alaska North Slope, an evaluation of the experimental lake?s hydrological response to snowdrift melt, and cost assessment of snowdrift?generated water. High snow transport rates (0.49 kg/s/m) ensured that the snowdrift reached its equilibrium profile by winter's end. Generally, natural snowpack disappeared by the beginning of June in this area. In contrast, snow in the drift lasted through early July, supplying the experimental lake with snowmelt when water in other tundra lakes was decreasing. The experimental lake retained elevated water levels during the entire open?water season. Comparison of lake water volumes during the experiment against the baseline year showed that, by the end of summer, the drift generated by the snow fence had increased lake water volume by at least 21?29%. We estimated water cost at 1.9 cents per gallon during the first year and 0.8 cents per gallon during the second year. This estimate depends on the cost of snow fence construction in remote arctic locations, which we assumed to be at $7.66 per square foot of snow fence frontal area. The snow fence technique was effective in augmenting the supply of lake water during summers 2010 and 2011 despite low rainfall during both summers. Snow fences are a simple, yet an effective, way to replenish tundra lakes with freshwater and increase water availability in winter. This research project was synergetic with the NETL project, "North Slope Decision Support System (NSDSS) for Water Resources Planning and Management." The results

Stuefer, Svetlana

2013-03-31T23:59:59.000Z

87

Using Snow Fences to Augument Fresh Water Supplies in Shallow Arctic Lakes  

SciTech Connect

This project was funded by the U.S. Department of Energy, National Energy Technology Laboratory (NETL) to address environmental research questions specifically related to Alaska?s oil and gas natural resources development. The focus of this project was on the environmental issues associated with allocation of water resources for construction of ice roads and ice pads. Earlier NETL projects showed that oil and gas exploration activities in the U.S. Arctic require large amounts of water for ice road and ice pad construction. Traditionally, lakes have been the source of freshwater for this purpose. The distinctive hydrological regime of northern lakes, caused by the presence of ice cover and permafrost, exerts influence on lake water availability in winter. Lakes are covered with ice from October to June, and there is often no water recharge of lakes until snowmelt in early June. After snowmelt, water volumes in the lakes decrease throughout the summer, when water loss due to evaporation is considerably greater than water gained from rainfall. This balance switches in August, when air temperature drops, evaporation decreases, and rain (or snow) is more likely to occur. Some of the summer surface storage deficit in the active layer and surface water bodies (lakes, ponds, wetlands) is recharged during this time. However, if the surface storage deficit is not replenished (for example, precipitation in the fall is low and near?surface soils are dry), lake recharge is directly affected, and water availability for the following winter is reduced. In this study, we used snow fences to augment fresh water supplies in shallow arctic lakes despite unfavorable natural conditions. We implemented snow?control practices to enhance snowdrift accumulation (greater snow water equivalent), which led to increased meltwater production and an extended melting season that resulted in lake recharge despite low precipitation during the years of the experiment. For three years (2009, 2010, and 2011), we selected and monitored two lakes with similar hydrological regimes. Both lakes are located 30 miles south of Prudhoe Bay, Alaska, near Franklin Bluffs. One is an experimental lake, where we installed a snow fence; the other is a control lake, where the natural regime was preserved. The general approach was to compare the hydrologic response of the lake to the snowdrift during the summers of 2010 and 2011 against the ?baseline? conditions in 2009. Highlights of the project included new data on snow transport rates on the Alaska North Slope, an evaluation of the experimental lake?s hydrological response to snowdrift melt, and cost assessment of snowdrift?generated water. High snow transport rates (0.49 kg/s/m) ensured that the snowdrift reached its equilibrium profile by winter's end. Generally, natural snowpack disappeared by the beginning of June in this area. In contrast, snow in the drift lasted through early July, supplying the experimental lake with snowmelt when water in other tundra lakes was decreasing. The experimental lake retained elevated water levels during the entire open?water season. Comparison of lake water volumes during the experiment against the baseline year showed that, by the end of summer, the drift generated by the snow fence had increased lake water volume by at least 21?29%. We estimated water cost at 1.9 cents per gallon during the first year and 0.8 cents per gallon during the second year. This estimate depends on the cost of snow fence construction in remote arctic locations, which we assumed to be at $7.66 per square foot of snow fence frontal area. The snow fence technique was effective in augmenting the supply of lake water during summers 2010 and 2011 despite low rainfall during both summers. Snow fences are a simple, yet an effective, way to replenish tundra lakes with freshwater and increase water availability in winter. This research project was synergetic with the NETL project, "North Slope Decision Support System (NSDSS) for Water Resources Planning and Management." The results

Stuefer, Svetlana

2013-03-31T23:59:59.000Z

88

FACTORS AFFECTING THE SUSTAINABILITY OF RURAL WATER SUPPLY SYSTEMS: THE CASE OF MECHA WOREDA, AMHARA REGION, ETHIOPIA  

E-Print Network (OSTI)

in their system. Consideration of the above mentioned factors may help in decreasing the failure rate of newly....................................................33 #12;ix LIST OF ABBREVIATIONS ADF Africa Development Fund BWR Basic Water Requirement CSA Central if they fail after a short time. In order to make the investment in water supplies more effective, failure

89

The Development of Simulation Model for D2O Supply System in Heavy Water Nuclear Power Plant  

Science Conference Proceedings (OSTI)

The main purpose of this research is improvement of performance in control system for heavy water supply system of nuclear fuel change machine. Before started design of control system, the model of target system is needed because it is hard to test and ... Keywords: simulation, nuclear, heavy-water, D2O, MATLAB

Sung-Won Choi; Seong-Geun Kwak; Ji-Hyoung Ryu; Kil-To Chong; Chang-Goo Lee

2012-05-01T23:59:59.000Z

90

High temperature gas reactor and energy pipeline system  

SciTech Connect

Under contract to the General Electric Co. as a part of a DOE-sponsored program, the Energy Systems Analysis Group at the Institute of Gas Technology examined the following aspects of the high temperature gas reactor closed loop chemical energy pipeline concept: (1) pipeline transmission and storage system design; (2) pipeline and storage system cost; (3) methane reformer interface; and (4) system safety and environmental aspects. This work focuses on the pipeline and storage system concepts, pipeline size, compressor power, and storage facility requirements were developed for 4 different types of pipeline systems to obtain system cost estimates. Each pipeline system includes a synthesis-gas pipeline from the reformer to the methanator, a methane-rich gas pipeline from the methanator to the reformer, a water return line from the methanator to the reformer, and storage for the synthesis gas, methane-rich gas and water.

Daniels, E.; Blazek, C.; Pflasterer, G.R.; Allen, D.C.

1981-01-01T23:59:59.000Z

91

High temperature gas reactor and energy pipeline system  

DOE Green Energy (OSTI)

A study was made of the following aspects of the High Temperature Gas Reactor (HTGR) Closed Loop Chemical Energy Pipeline (CEP) concept: pipeline transmission and storage system design, pipeline and storage system cost, methane reformer interface, and system safety and environmental aspects. This paper focuses on the pipeline and storage system concepts. Pipeline size, compressor power, and storage facility requirements were developed for four different types of pipeline systems to obtain system cost estimates. Each pipeline system includes a synthesis-gas pipeline from the reformer to the methanator, a methane-rich gas pipeline from the methanator to the reformer, a water return line from the methanator to the reformer, and storage for the synthesis gas, methane-rich gas and water.

Daniels, E.; Blazek, C.; Allen, D.C.; Pflasterer, G.R.

1980-12-19T23:59:59.000Z

92

Water and Sustainability (Volume 2): An Assessment of Water Demand, Supply, and Quality in the U.S. -- The Next Half Century  

Science Conference Proceedings (OSTI)

The fast growing demand for clean, fresh water -- coupled with the need to protect and enhance the environment -- has made many areas of the United States and the rest of the world vulnerable to water shortages for various human uses. As they interact with the electricity industry, these uses encompass agricultural irrigation, thermoelectric generation, municipal water/wastewater treatment and distribution, and industrial processes. The dependency of electricity supply and demand on water availability ca...

2002-03-01T23:59:59.000Z

93

Pipeline corridors through wetlands  

SciTech Connect

This paper presents preliminary findings from six vegetational surveys of gas pipeline rights-of-way (ROW) through wetlands and quantifies the impacts of a 20-year-old pipeline ROW through a boreal forest wetland. Six sites of various ages were surveyed in ecosystems ranging from coastal marsh to forested wetland. At all sites except one, both the number and the percentage of wetland species on the Row approximated or exceeded those in the adjacent natural area. The boreal forest study showed that (1) adjacent natural wetland areas were not altered in type; (2) water sheet flow restriction had been reversed by nature; (3) no nonnative plant species invaded the natural area; (4) three-quarters of the ROW area was a wetland, and (5) the ROW increased diversity.

Zimmerman, R.E.; Wilkey, P.L. [Argonne National Lab., IL (United States); Isaacson, H.R. [Gas Research Institute (United States)

1992-12-01T23:59:59.000Z

94

Pipeline corridors through wetlands  

Science Conference Proceedings (OSTI)

This paper presents preliminary findings from six vegetational surveys of gas pipeline rights-of-way (ROW) through wetlands and quantifies the impacts of a 20-year-old pipeline ROW through a boreal forest wetland. Six sites of various ages were surveyed in ecosystems ranging from coastal marsh to forested wetland. At all sites except one, both the number and the percentage of wetland species on the Row approximated or exceeded those in the adjacent natural area. The boreal forest study showed that (1) adjacent natural wetland areas were not altered in type; (2) water sheet flow restriction had been reversed by nature; (3) no nonnative plant species invaded the natural area; (4) three-quarters of the ROW area was a wetland, and (5) the ROW increased diversity.

Zimmerman, R.E.; Wilkey, P.L. (Argonne National Lab., IL (United States)); Isaacson, H.R. (Gas Research Institute (United States))

1992-01-01T23:59:59.000Z

95

EIA - Natural Gas Pipeline System - Southeast Region  

U.S. Energy Information Administration (EIA) Indexed Site

Southeast Region Southeast Region About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Pipelines in the Southeast Region Overview | Transportation to Atlantic & Gulf States | Gulf of Mexico Transportation Corridor | Transportation to the Northern Tier | Regional Pipeline Companies & Links Overview Twenty-three interstate, and at least eight intrastate, natural gas pipeline companies operate within the Southeast Region (Alabama, Florida, Georgia, Kentucky, Mississippi, North Carolina, South Carolina, and Tennessee). Fifteen of the twenty-one interstate natural gas pipelines originate in the Southwest Region and receive most of their supplies from the Gulf of Mexico or from the States of Texas and/or Louisiana.

96

Pipeline Safety (Maryland)  

Energy.gov (U.S. Department of Energy (DOE))

The Public Service Commission has the authority enact regulations pertaining to pipeline safety. These regulations address pipeline monitoring, inspections, enforcement, and penalties.

97

Hydrogen Pipeline Safety  

Science Conference Proceedings (OSTI)

... data, we can model the performance of pipeline materials and make predictions about the safe operating limits of pipelines carrying pressurized ...

2013-01-31T23:59:59.000Z

98

Gas Pipeline Safety (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

This section establishes the Pipeline Safety Division within the Utility Regulatory Commission to administer federal pipeline safety standards and establish minimum state safety standards for...

99

Pipeline Safety (South Dakota)  

Energy.gov (U.S. Department of Energy (DOE))

The South Dakota Pipeline Safety Program, administered by the Public Utilities Commission, is responsible for regulating hazardous gas intrastate pipelines. Relevant legislation and regulations...

100

Living off-grid in an arid environment without a well : can residential and commercial/industrial water harvesting help solve water supply problems?  

Science Conference Proceedings (OSTI)

Our family of three lives comfortably off-grid without a well in an arid region ({approx}9 in/yr, average). This year we expect to achieve water sustainability with harvested or grey water supporting all of our needs (including a garden and trees), except drinking water (about 7 gallons/week). We discuss our implementation and the implication that for an investment of a few thousand dollars, many single family homes could supply a large portion of their own water needs, significantly reducing municipal water demand. Generally, harvested water is very low in minerals and pollutants, but may need treatment for microbes in order to be potable. This may be addressed via filters, UV light irradiation or through chemical treatment (bleach). Looking further into the possibility of commercial water harvesting from malls, big box stores and factories, we ask whether water harvesting could supply a significant portion of potable water by looking at two cities with water supply problems. We look at the implications of separate municipal water lines for potable and clean non-potable uses. Implications on changes to future building codes are explored.

Axness, Carl L.; Ferrando, Ana

2010-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Pipeline, rail backers lock horns on coal transport. [Coal pipeline act, H. R. 4370  

SciTech Connect

The backers of railroad and pipeline transport for coal clashed at hearings on the proposed Coal Pipeline Act. Slurry-pipeline advocates, claiming that high rail rates discourage industry and are counter to national energy goals, are seeking the eminent domain they need to secure rights-of-way for pipeline construction. Railroad lobbyists have successfully fought the idea so far and will continue to oppose a competing transport system. Proponents of several pipeline routes see them as a way to lower transport prices, while handling only about five percent of the nation's coal. The economics of pipelines appear to be a factor of distance and volume, with no hard evidence available. Arguments of both sides of the controversy are cited. Water rights are a major problem in transporting Western coal by pipeline and, in some states, are a larger issue than eminent domain. (DCK)

Murnane, T.

1980-03-24T23:59:59.000Z

102

Optimal operation of pipeline systems using genetic algorithm  

Science Conference Proceedings (OSTI)

A Genetic Algorithm (GA) is used in this paper for the optimal operation, result in better solution than the existing one, of the pipeline systems under transient conditions caused by valve closure. Simulation of pipeline system is carried out here by ... Keywords: genetic algorithm, implicit method of characteristic, pipeline system, transient flow, water hammer

M. H. Afshar; M. Rohani

2009-05-01T23:59:59.000Z

103

Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation  

E-Print Network (OSTI)

Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation P. Sofronis, I. M. Robertson, D. D. Johnson University of Illinois at Urbana-Champaign Hydrogen Pipeline Working Group Workshop% · Contractor share: 25% · Barriers ­ Hydrogen embrittlement of pipelines and remediation (mixing with water

104

Improved performance of PSO with self-adaptive parameters for computing the optimal design of Water Supply Systems  

Science Conference Proceedings (OSTI)

This paper deals with a new variant of Particle Swarm Optimization (PSO) in which no a priori parameter tuning is necessary. PSO, as an efficient and powerful problem-solving technique, has been widely used, but, as in other Evolutionary Algorithms (EA), ... Keywords: Evolutionary Algorithm, Optimal design, Particle Swarm Optimization, Self-adaptive parameters, Water Supply System

Idel Montalvo; Joaquín Izquierdo; Rafael Pérez-García; Manuel Herrera

2010-08-01T23:59:59.000Z

105

New construction era reflected in East Texas LPG pipeline  

SciTech Connect

Installation of 240 miles of 6, 10, and 12-in. LPG pipelines from Mont Belvieu to Tyler, Tex., has provided greater feedstock-supply flexibility to a petrochemical plant in Longview, Tex. The project, which took place over 18 months, included tie-ins with metering at four Mont Belvieu suppliers. The new 10 and 12-in. pipelines now transport propane while the new and existing parts of a 6-in. pipeline transport propylene.

Mittler, T.J. (Texas Eastman Co., Longview, TX (US))

1990-04-02T23:59:59.000Z

106

EIA - Natural Gas Pipeline Network - Regional Overview and Links  

U.S. Energy Information Administration (EIA) Indexed Site

Overview and Links Overview and Links About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Regional Overviews and Links to Pipeline Companies Through a series of interconnecting interstate and intrastate pipelines the transportation of natural gas from one location to another within the United States has become a relatively seamless operation. While intrastate pipeline systems often transports natural gas from production areas directly to consumers in local markets, it is the interstate pipeline system's long-distance, high-capacity trunklines that supply most of the major natural gas markets in the United States. Of the six geographic regions defined in this analysis, the Southwest Region contains the largest number of individual natural gas pipeline systems (more than 90) and the highest level of pipeline mileage (over 106,000).

107

Method and apparatus for the laying of a submerged pipeline such as a submarine pipeline. [Patents  

SciTech Connect

A method and apparatus are disclosed for laying a submerged pipeline, such as a submarine pipeline, on the bed of a body of water along a path which crosses a ditch in the bed in which there is a current transverse to the pipeline, the depth of the body of water being at a maximum in the ditch and the pipeline being drawn along the bed from a shore towards open water, wherein at least one ballast tube is integrally associated with the pipeline so that a portion of the pipeline with the associated ballast tube takes up a position within the ditch in substantially U-form, the ballast tube being filled partly with air and partly with water which collects in the portion of the ballast tube of substantially U-form whereby the apparent weight of the pipeline is increased solely with respect to the portion thereof located in the ditch, the water remaining in position in the portion of the ballast tube temporarily located within the ditch as the pipeline and the associated ballast tube move forward during the laying operation. An air circulation pipe may be associated with the ballast tube, being preferably located inside the ballast tube, the pipe placing the part of the space within the ballast tube near the front end thereof into communication with a source of air located on land.

Lamy, J.E.

1977-12-13T23:59:59.000Z

108

Conserving Our Finite Water Supplies in an Era of Chronic Drought  

E-Print Network (OSTI)

Handbook of water use and conservation: Homes, Landscapes,Handbook of Water Use and Conservation: Homes, Landscapes,are now over 100 water conservation "hardware" (fixture,

Vickers, Amy

2002-01-01T23:59:59.000Z

109

Evaluating the energy and carbon footprint of water conveyance system and future water supply options for Las Vegas, Nevada.  

E-Print Network (OSTI)

??Water production requires the use of energy to transport water from distant locations, pump groundwater from deep aquifers and treat water to meet stringent drinking… (more)

Shrestha, Eleeja

2010-01-01T23:59:59.000Z

110

New natural gas pipeline capacity adds service into Florida ...  

U.S. Energy Information Administration (EIA)

The lack of natural gas storage in Florida, as well as limited areas of gas production, makes the State dependent on two main supply pipelines for most of its natural ...

111

Components in the Pipeline  

Science Conference Proceedings (OSTI)

Scientists commonly describe their data processing systems metaphorically as software pipelines. These pipelines input one or more data sources and apply a sequence of processing steps to transform the data and create useful results. While conceptually simple, pipelines often adopt complex topologies and must meet stringent quality of service requirements that place stress on the software infrastructure used to construct the pipeline. In this paper we describe the MeDICi Integration Framework, which is a component-based framework for constructing complex software pipelines. The framework supports composing pipelines from distributed heterogeneous software components and provides mechanisms for controlling qualities of service to meet demanding performance, reliability and communication requirements.

Gorton, Ian; Wynne, Adam S.; Liu, Yan (Jenny); Yin, Jian

2011-02-24T23:59:59.000Z

112

Geotechnical analysis of offshore pipelines and steel catenary risers.  

E-Print Network (OSTI)

??As hydrocarbon developments move further offshore into deeper water, the pipelines and risers used in the transportation of oil and gas form an increasingly significant… (more)

Hodder, Matthew Steven

2009-01-01T23:59:59.000Z

113

Vendors of Supplies and Equipment Used in ReceivingWater Monitoring  

E-Print Network (OSTI)

low-cost GPS units, other navigation aids, waders, and other general outdoor equipment@aol.com, Internet: holidayjunction.com/aro/ · Aquaculture Supply (culture foods and equipment, airstones, Spirulina

Pitt, Robert E.

114

Colorado river basin and climatic change. The sensitivity of streamflow and water supply to variations in temperature and precipitation  

SciTech Connect

Growing international concern about the greenhouse effect has led to increased interest in the regional implications of changes in temperature and precipitation patterns for a wide range of societal and natural systems, including agriculture, sea level, biodiversity, and water resources. The accumulation of greenhouse gases in the atmosphere due to human activities are likely to have significant, though still poorly understood, impacts on water quality and availability. One method developed over the last several years for determining how regional water resources might be affected by climatic change is to develop scenarios of changes in temperature and precipitation and to use hydrologic simulation models to study the impacts of these scenarios on runoff and water supply. In the paper the authors present the results of a multi-year study of the sensitivity of the hydrology and water resources systems in the Colorado River Basin to plausible climatic changes.

Nash, L.L.; Gleick, P.H.

1993-12-01T23:59:59.000Z

115

Gas Pipelines:- long, thin, bombs?  

Science Conference Proceedings (OSTI)

... Gas Pipelines:- long, thin, bombs? Gas pipelines attract substantial reseach to improve safety and cut costs. They operate ...

116

Integrated system for coal-methanol liquefaction and slurry pipeline transportation. Final report. [In slurry transport  

DOE Green Energy (OSTI)

The engineering economics of an integrated coal-to-methanol conversion system and coal-in-methanol transportation system are examined, under the circumstances of the western coalfields, i.e., long distances from major markets and scarcity of water in the vicinity of the mines. The transportation economics are attractive, indicating tariffs of approximately 40 cents per million Btu per thousand miles for the coal-methanol pipeline vs 60 cents via coal-water pipelines and upwards of a dollar via rail. Energy consumption is also less in the coal-methanol pipeline than in the coal-water pipeline, and about equal to rail. It is also concluded that, by a proper marriage of the synthetic fuel (methanolization) plant to the slurrification plant, most, and in some cases all, of the water required by the synthetic fuel process can be supplied by the natural moisture of the coal itself. Thus, the only technology which presently exists and by which synthetic fuel from western coal can displace petroleum in the automotive fuel market is the integrated methanol conversion and tranportation system. The key element is the ability of the methanol slurry pipeline to accept and to deliver dry (1 to 5% moisture) coal, allowing the natural coal moisture to be used as synthesis feedstock in satisfaction of the large water requirement of any synthetic fuel plant. By virtue of these unique properties, this integrated system is seen as the only means in the foreseeable future whereby western coal can be converted to synthetic fuel and moved to distant markets.

Banks, W.F.; Davidson, J.K.; Horton, J.H.; Summers, C.W.

1980-03-31T23:59:59.000Z

117

Refiners react to changes in the pipeline infrastructure  

SciTech Connect

Petroleum pipelines have long been a critical component in the distribution of crude and refined products in the U.S. Pipelines are typically the most cost efficient mode of transportation for reasonably consistent flow rates. For obvious reasons, inland refineries and consumers are much more dependent on petroleum pipelines to provide supplies of crude and refined products than refineries and consumers located on the coasts. Significant changes in U.S. distribution patterns for crude and refined products are reshaping the pipeline infrastructure and presenting challenges and opportunities for domestic refiners. These changes are discussed.

Giles, K.A. [Barnes and Click Inc., Dallas, TX (United States)

1997-06-01T23:59:59.000Z

118

Keystone XL pipeline update  

Energy.gov (U.S. Department of Energy (DOE))

Questions have been raised recently about the Keystone XL pipeline project, so we wanted to make some points clear.

119

PipeProbe: a mobile sensor droplet for mapping hidden pipeline  

Science Conference Proceedings (OSTI)

This paper presents PipeProbe, a mobile sensor system for determining the spatial topology of hidden water pipelines behind walls. PipeProbe works by dropping a tiny wireless sensor capsule into the source of the water pipelines. As the PipeProbe capsule ... Keywords: constraint satisfaction, mapping water pipeline, sensor inference, wireless sensor networks

Tsung-te (Ted) Lai; Yu-han (Tiffany) Chen; Polly Huang; Hao-hua Chu

2010-11-01T23:59:59.000Z

120

Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement Cameron and Calcasieu Parishes, Louisiana  

Science Conference Proceedings (OSTI)

The proposed action and three alternatives, including a No Build alternative, were evaluated along the existing RWIPL alignment to accommodate the placement of the proposed RWIPL. Construction feasibility, reasonableness and potential environmental impacts were considered during the evaluation of the four actions (and action alternatives) for the proposed RWIPL activities. Reasonable actions were identified as those actions which were considered to be supported by common sense and sound technical principles. Feasible actions were those actions which were considered to be capable of being accomplished, practicable and non-excessive in terms of cost. The evaluation process considered the following design specifications, which were determined to be important to the feasibility of the overall project. The proposed RWIPL replacement project must therefore: (1) Comply with the existing design basis and criteria, (2) Maintain continuity of operation of the facility during construction, (3)Provide the required service life, (4) Be cost effective, (5)Improve the operation and maintenance of the pipeline, and (6) Maintain minimal environmental impact while meeting the performance requirements. Sizing of the pipe, piping construction materials, construction method (e.g., open-cut trench, directional drilling, etc.) and the acquisition of new Right-of-Way (ROW) were additionally evaluated in the preliminary alternative identification, selection and screening process.

N /A

2004-08-31T23:59:59.000Z

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Atrazine Contamination in a Rural Source-Water Supply: Spa Lake, Lewisburg, Kentucky.  

E-Print Network (OSTI)

??In 1998, Western Kentucky University (WKU) worked in collaboration with the Environmental Protection Agency (EPA), Drinking Water Protection Division, to investigate methods to improve source-water… (more)

Seadler, Kathryn

2004-01-01T23:59:59.000Z

122

INTERNAL REPAIR OF PIPELINES  

Science Conference Proceedings (OSTI)

The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. In lieu of a field installation on an abandoned pipeline, a preliminary nondestructive testing protocol is being developed to determine the success or failure of the fiber-reinforced liner pipeline repairs. Optimization and validation activities for carbon-fiber repair methods are ongoing.

Bill Bruce; Nancy Porter; George Ritter; Matt Boring; Mark Lozev; Ian Harris; Bill Mohr; Dennis Harwig; Robin Gordon; Chris Neary; Mike Sullivan

2005-07-20T23:59:59.000Z

123

The National Energy Modeling System: An Overview 1998 - Oil and Gas Supply  

Gasoline and Diesel Fuel Update (EIA)

OIL AND GAS SUPPLY MODULE OIL AND GAS SUPPLY MODULE blueball.gif (205 bytes) Lower 48 Onshore and Shallow Offshore Supply Submodule blueball.gif (205 bytes) Deep Water Offshore Supply Submodule blueball.gif (205 bytes) Alaska Oil and Gas Submodule blueball.gif (205 bytes) Enhanced Oil Recovery Submodule blueball.gif (205 bytes) Foreign Natural Gas Supply Submodule The oil and gas supply module (OGSM) consists of a series of process submodules that project the availability of: Domestic crude oil production and dry natural gas production from onshore, offshore, and Alaskan reservoirs Imported pipeline-quality gas from Mexico and Canada Imported liquefied natural gas. The OGSM regions are shown in Figure 12. The driving assumption of the OGSM is that domestic oil and gas exploration and development are undertaken if the discounted present value of the

124

Energy-efficient pipelines  

E-Print Network (OSTI)

We discuss the design of energy-efficient pipelines for asynchronous VLSI architectures. To maximize throughput in asynchronous pipelines it is often necessary to insert buffer stages, increasing the energy overhead. Instead of optimizing pipelines for minimum energy or maximum throughput, we consider a joint energy-time metric of the form ? ?,where?is the energy per operation and ? is the time per operation. We show that pipelines optimized for the ? ? energy-time metric may need fewer buffer stages and we give bounds when such stages can be removed. We present several common asynchronous pipeline structures and their energy-time optimized solutions. 1.

John Teifel; David Fang; David Biermann; Clint Kelly; Rajit Manohar

2002-01-01T23:59:59.000Z

125

Pipeline integrity programs help optimize resources  

SciTech Connect

Natural Gas Pipeline Co. of America has developed an integrity program. NGPL operates approximately 13,000 miles of large-diameter parallel gas pipelines, which extend from traditional supply areas to the Chicago area. Line Number 1, the 24-in. Amarillo-to-Chicago mainline, was built in 1931, and parts of it are still in operation today. More than 85% of the NGPL systems is more than 25 years old, and continues to provide very reliable service. The company operated for many years with specialized crews dedicated to pipeline systems, and a corrosion department. Under this organization, employees developed an intimate knowledge of the pipeline and related integrity issues. NGPL relied on this knowledge to develop its integrity program. The risk assessment program is a very valuable tool for identifying areas that may need remedial work. However, it is composed of many subjective evaluations and cannot predict failure nor ensure good performance. The program is an excellent data management tool that enables a pipeline operator to combine all available information needed to make integrity decisions. The integrity of a pipeline is continually changing, and any program should be updated on a regular basis.

Dusek, P.J. (Natural Gas Pipeline Co. of America, Lombard, IL (United States))

1994-03-01T23:59:59.000Z

126

A Wireless Sensor Network for Pipeline Monitoring Ivan Stoianov  

E-Print Network (OSTI)

operational and maintenance costs as a result of aging pipeline infrastructures. Leaks and ruptures in water is a non-trivial task, because of the scale and age of the pipeline infrastructure and lack of operational Tokmouline MIT CSAIL {smadden, timurt}@mit.edu ABSTRACT US water utilities are faced with mounting

127

Water use and supply concerns for utility-scale solar projects in the Southwestern United States.  

SciTech Connect

As large utility-scale solar photovoltaic (PV) and concentrating solar power (CSP) facilities are currently being built and planned for locations in the U.S. with the greatest solar resource potential, an understanding of water use for construction and operations is needed as siting tends to target locations with low natural rainfall and where most existing freshwater is already appropriated. Using methods outlined by the Bureau of Land Management (BLM) to determine water used in designated solar energy zones (SEZs) for construction and operations&maintenance, an estimate of water used over the lifetime at the solar power plant is determined and applied to each watershed in six Southwestern states. Results indicate that that PV systems overall use little water, though construction usage is high compared to O&M water use over the lifetime of the facility. Also noted is a transition being made from wet cooled to dry cooled CSP facilities that will significantly reduce operational water use at these facilities. Using these water use factors, estimates of future water demand for current and planned solar development was made. In efforts to determine where water could be a limiting factor in solar energy development, water availability, cost, and projected future competing demands were mapped for the six Southwestern states. Ten watersheds, 9 in California, and one in New Mexico were identified as being of particular concern because of limited water availability.

Klise, Geoffrey Taylor; Tidwell, Vincent Carroll; Reno, Marissa Devan; Moreland, Barbara D.; Zemlick, Katie; Macknick, Jordan [National Renewable Energy Laboratory Golden, CO

2013-07-01T23:59:59.000Z

128

Tri-State Synfuels Project Review: Volume 9A. Subcontract information. [Proposed Henderson, Kentucky coal to gasoline plant; water supply and civil engineering subcontracts  

DOE Green Energy (OSTI)

Volume 9A considers subcontract work done at the site involving hydrogeological studies with respect to water supply and geotechnical work with respect to the building foundations necessary based on boreholes drilled and the lithology of the area. (LTN)

Not Available

1982-06-01T23:59:59.000Z

129

New demands, new supplies : a national look at the water balance of carbon dioxide capture and sequestration.  

Science Conference Proceedings (OSTI)

Concerns over rising concentrations of greenhouse gases in the atmosphere have resulted in serious consideration of policies aimed at reduction of anthropogenic carbon dioxide (CO2) emissions. If large scale abatement efforts are undertaken, one critical tool will be geologic sequestration of CO2 captured from large point sources, specifically coal and natural gas fired power plants. Current CO2 capture technologies exact a substantial energy penalty on the source power plant, which must be offset with make-up power. Water demands increase at the source plant due to added cooling loads. In addition, new water demand is created by water requirements associated with generation of the make-up power. At the sequestration site however, saline water may be extracted to manage CO2 plum migration and pressure build up in the geologic formation. Thus, while CO2 capture creates new water demands, CO2 sequestration has the potential to create new supplies. Some or all of the added demand may be offset by treatment and use of the saline waters extracted from geologic formations during CO2 sequestration. Sandia National Laboratories, with guidance and support from the National Energy Technology Laboratory, is creating a model to evaluate the potential for a combined approach to saline formations, as a sink for CO2 and a source for saline waters that can be treated and beneficially reused to serve power plant water demands. This presentation will focus on the magnitude of added U.S. power plant water demand under different CO2 emissions reduction scenarios, and the portion of added demand that might be offset by saline waters extracted during the CO2 sequestration process.

Krumhansl, James Lee; McNemar, Andrea (National Energy Technology Laboratory (NETL), Morgantown, WV); Kobos, Peter Holmes; Roach, Jesse Dillon; Klise, Geoffrey Taylor

2010-12-01T23:59:59.000Z

130

A Ten-year Survey of Giardia Cysts in Drinking Water Supplies of Seoul, the Republic of Korea  

E-Print Network (OSTI)

Abstract: To understand the distribution of Giardia cysts in drinking water supplies in Seoul, Korea, we collected water samples quarterly at 6 intakes in the Han River, its largest stream and 6 conventional water treatment plants (WTPs) serving drinking water, from 2000 to 2009. Giardia cysts in each of 10 L water were confirmed in 35.0 % of intake water samples and the arithmetic mean was 1.65 cysts/10 L (range 0-35 cysts/10 L). The lowest cyst density was observed at Paldang and Kangbuk intakes, and the pollution level was higher at 4 intakes downstream. It seemed that these 4 intakes were under influence of Wangsuk stream at the end of which cysts were found in all samples with the mean of 140 cysts/10 L. The annual mean number of cysts was 0.21-4.21 cysts/10 L, and the cyst level at the second half of the 10 years was about 1/5 of that at first half on average. The cysts were more frequently found in winter, and their mean density was 3.74 cysts/10 L in winter and 0.80-1.08 cysts/10 L in other seasons. All finished water samples collected at 6 WTPs were negative for Giardia in each of 100 L sample for 10 years and cyst removal by physical process was average 2.9-log. It was concluded that conventional water treatment at 6 WTPs of Seoul appears to remove the cysts effectively under the present level of their source water. Domestic wastewater from the urban region could be an important source of Giardia pollution

Mok-young Lee; Eun-joo Cho; Jin-hyo Lee; Sun-hee Han; Yong-sang Park

2010-01-01T23:59:59.000Z

131

EIA - Natural Gas Pipeline Network - Natural Gas Pipeline Mileage...  

U.S. Energy Information Administration (EIA) Indexed Site

Home > Natural Gas > About U.S. Natural Gas Pipelines > Natural Gas Pipeline Mileage by State About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through...

132

EIA - Natural Gas Pipeline Network - Interstate Pipelines Segment  

Gasoline and Diesel Fuel Update (EIA)

Home > Natural Gas > About U.S. Natural Gas Pipelines > Interstate Natural Gas Pipeline Segment About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through...

133

Coal log pipeline research at the University of Missouri. 3rd Quarterly report, July 1, 1993--September 30, 1993  

SciTech Connect

This report summarizes a research program on the transport of coal by formation of coal logs, and subsequent transport in pipelines. Separate projects within this program address questions on the formation of the coal logs, flow in pipelines, including slurry pipelines, interaction with water, wear in pipelines, and questions on economics and legal aspects.

Liu, H.

1994-05-01T23:59:59.000Z

134

The Noao Newfirm Pipeline  

E-Print Network (OSTI)

The NOAO NEWFIRM Pipeline produces instrumentally calibrated data products and data quality measurements from all exposures taken with the NOAO Extremely Wide-Field Infrared Imager (NEWFIRM) at the KPNO Mayall 4-meter telescope. We describe the distributed nature of the NEWFIRM Pipeline, the calibration data that are applied, the data quality metadata that are derived, and the data products that are delivered by the NEWFIRM Pipeline.

Swaters, R A; Dickinson, M E

2009-01-01T23:59:59.000Z

135

Product Pipeline Reports Tutorial  

Gasoline and Diesel Fuel Update (EIA)

Home > Petroleum > Petroleum Survey Forms> Petroleum Survey Forms Tutorial Product Pipeline Reports Tutorial Content on this page requires a newer version of Adobe Flash Player....

136

Pipeline Construction Guidelines (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

This division of the Utility Regulatory Commission regulates the construction of any segment of an interstate pipeline on privately owned land in Indiana. The division has provisions for...

137

Liquefaction and Pipeline Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

factors add 20 percent to liquefaction plant total installed cost 6 Distribution Pipeline Costs Collected historical Oil & Gas Journal data, and surveyed for current urban and...

138

NewPipeline-Robot-Power-Source.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Sources for Power Sources for Inspection Robots in Natural Gas Transmission Pipelines By Shreekant B. Malvadkar and Edward L. Parsons Office of Systems & Policy Support INTRODUCTION Strategic Center of Natural gas's (SCNG) Natural Gas Infrastructure Reliability Product Team has undertaken the development of a prototype robot that would inspect and possibly repair transmission pipelines. NETL has granted a contract for this purpose to New York Gas Group (NYGAS) and Carnegie Mellon University's (CMU) National Robotics Engineering Consortium (NREC). The purpose of this study is to analyze various onboard power supply options for such a commercially viable robot that can operate in a transmission pipeline for extended period. The primary power sources considered are wind turbines, rechargeable batteries,

139

EIA - Natural Gas Pipeline Network - Largest Natural Gas Pipeline...  

Gasoline and Diesel Fuel Update (EIA)

through 20072008 with selected updates Thirty Largest U.S. Interstate Natural Gas Pipeline Systems, 2008 (Ranked by system capacity) Pipeline Name Market Regions Served Primary...

140

Pipeline under construction Sea Proposed/planned pipeline Possible ...  

U.S. Energy Information Administration (EIA)

Arab Gas Pipeline Maghreb-Europe GME Shah-Deniz Statfjord Ormen Lange TrollTTrollroll ... Greece-Italy Interconnector Turkey-Greece Interconnector South Caucasus Pipeline

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

The energy-efficiency benefits of pumps-scheduling optimization for potable water supplies  

Science Conference Proceedings (OSTI)

Water utilities across the developed world have been installing and operating telemetry and SCADA (supervisory control and data acquisition) facilities for at least three decades. They have amassed substantial quantities of historical operational data ...

S. M. Bunn; L. Reynolds

2009-05-01T23:59:59.000Z

142

Development of Water Supply and Sanitation Facility in The Rural Areas of Nepal: An Overview  

E-Print Network (OSTI)

), Water Aid, Save the Children Fund United Kingdom (SCF-UK), Save the Children Fund United States of America (SCF-USA), Redd Barna, World Bank, Asian Development Bank, (RWSS- FUND) FUND Board and numbers of other Community Based Organizations (CBOs) have... of unsafe water, and its methods of prevention, transmission of diseases by fecal oral routes, its negative effects, and its prevention, and importance & urgency of construction, and use of latrine. Fifth day includes construction of latrine (practical...

Prasain, Jiba Nath

2003-01-01T23:59:59.000Z

143

Electricity Use and Management in the Municipal Water Supply and Wastewater Industries  

Science Conference Proceedings (OSTI)

The use of electricity for water and wastewater treatment is increasing due to demands for expanded service capacity and new regulations for upgraded treatment. Options available to control the electricity costs include technological changes, improved management, and participation in electric utility sponsored energy management programs. Appropriate options for a specific system will vary depending on the system characteristics, availability of electric utility programs to assist the water and ...

2013-11-26T23:59:59.000Z

144

Recommendations for at-risk water supplies in Capiz Province, Philippines : using water source and community assessments  

E-Print Network (OSTI)

The following thesis is part of a larger project which began in response to a request by the Provincial Health Office (PHO) in Capiz Province, Philippines for expert advice to support its drinking water quality testing ...

Patrick, Jessica Molly

2010-01-01T23:59:59.000Z

145

EIA - Natural Gas Pipeline Network - Underground Natural Gas Storage  

U.S. Energy Information Administration (EIA) Indexed Site

Storage Storage About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Underground Natural Gas Storage Overview | Regional Breakdowns Overview Underground natural gas storage provides pipelines, local distribution companies, producers, and pipeline shippers with an inventory management tool, seasonal supply backup, and access to natural gas needed to avoid imbalances between receipts and deliveries on a pipeline network. There are three principal types of underground storage sites used in the United States today. They are: · depleted natural gas or oil fields (326), · aquifers (43), or · salt caverns (31). In a few cases mine caverns have been used. Most underground storage facilities, 82 percent at the beginning of 2008, were created from reservoirs located in depleted natural gas production fields that were relatively easy to convert to storage service, and that were often close to consumption centers and existing natural gas pipeline systems.

146

EIA - Analysis of Natural Gas Imports/Exports & Pipelines  

Gasoline and Diesel Fuel Update (EIA)

Imports/Exports & Pipelines Imports/Exports & Pipelines 2010 U.S Natural Gas Imports and Exports: 2009 This report provides an overview of U.S. international natural gas trade in 2009. Natural gas import and export data, including liquefied natural gas (LNG) data, are provided through the year 2009 in Tables SR1-SR9. Categories: Imports & Exports/Pipelines (Released, 9/28/2010, Html format) Natural Gas Year-In-Review 2009 This is a special report that provides an overview of the natural gas industry and markets in 2009 with special focus on the first complete set of supply and disposition data for 2009 from the Energy Information Administration. Topics discussed include natural gas end-use consumption trends, offshore and onshore production, imports and exports of pipeline and liquefied natural gas, and above-average storage inventories. Categories: Prices, Production, Consumption, Imports/Exports & Pipelines, Storage (Released, 7/9/2010, Html format)

147

EIS-0433: Keystone XL Pipeline | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Keystone XL Pipeline 3: Keystone XL Pipeline EIS-0433: Keystone XL Pipeline SUMMARY The Department of State, with DOE as a cooperating agency, is preparing a Supplemental EIS (SEIS) to evaluate the potential environmental impacts of a revised proposal for the Keystone XL pipeline and related facilities. More information on the SEIS is available here. The proposed Keystone XL project consists of a 1,700-mile crude oil pipeline and related facilities that would primarily be used to transport Western Canadian Sedimentary Basin crude oil from an oil supply hub in Alberta, Canada to delivery points in Oklahoma and Texas. This EIS, prepared by the Department of State, evaluates the environmental impacts of the proposed Keystone XL project. DOE's Western Area Power Administration, a cooperating agency, has jurisdiction over certain

148

Aspen Pipeline | Open Energy Information  

Open Energy Info (EERE)

| Sign Up Search Page Edit with form History Facebook icon Twitter icon Aspen Pipeline Jump to: navigation, search Name Aspen Pipeline Place Houston, Texas Zip 77057...

149

Natural Gas Pipeline Safety (Kansas)  

Energy.gov (U.S. Department of Energy (DOE))

This article states minimum safety standards for the transportation of natural gas by pipeline and reporting requirements for operators of pipelines.

150

EIA - Natural Gas Pipeline Network - Intrastate Natural Gas Pipeline  

U.S. Energy Information Administration (EIA) Indexed Site

Intrastate Natural Gas Pipeline Segment Intrastate Natural Gas Pipeline Segment About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Intrastate Natural Gas Pipeline Segment Overview Intrastate natural gas pipelines operate within State borders and link natural gas producers to local markets and to the interstate pipeline network. Approximately 29 percent of the total miles of natural gas pipeline in the U.S. are intrastate pipelines. Although an intrastate pipeline system is defined as one that operates totally within a State, an intrastate pipeline company may have operations in more than one State. As long as these operations are separate, that is, they do not physically interconnect, they are considered intrastate, and are not jurisdictional to the Federal Energy Regulatory Commission (FERC). More than 90 intrastate natural gas pipelines operate in the lower-48 States.

151

Questions and Issues on Hydrogen Pipelines: Pipeline Transmission of Hydrogen  

NLE Websites -- All DOE Office Websites (Extended Search)

Issues on Hydrogen Issues on Hydrogen Pipelines Pipeline Transmission of Hydrogen Doe Hydrogen Pipeline Working Group Meeting August 31, 2005 Pipeline Transmission of Hydrogen --- 2 Copyright: Air Liquide Pipeline Inventory Breakdown by gases 0 500 1000 1500 2000 2500 3000 3500 KM N2 2956 km O2 3447 km H2 1736 km CO/Syngas 61 km TOTAL 8200 km Pipeline Inventory 2004 Asie Pacific America Europe Pipeline Transmission of Hydrogen --- 3 Copyright: Pipeline Transmission of Hydrogen --- 4 Copyright: 3. Special structures River Crossings (culvert): 6 (Rhein, Ruhr, Rhein-Herne-Kanal) River crossing (on bridge): 1 (Rhein-Herne-Kanal) Motorway Crossings: 26 Overground Pipelines: approx 21 km Pipeline Transmission of Hydrogen --- 5 Copyright: 5. Mining areas Pipeline Transmission of Hydrogen --- 6 Copyright: France & Netherlands

152

U.S. LPG pipeline begins deliveries to Pemex terminal  

SciTech Connect

LPG deliveries began this spring to the new Mendez LPG receiving terminal near Juarez, State of Chihuahua, Mexico. Supplying the terminal is the 265-mile, 8-in. Rio Grande Pipeline that includes a reconditioned 217-mile, 8-in. former refined-products pipeline from near Odessa, Texas, and a new 48-mile, 8-in. line beginning in Hudspeth County and crossing the US-Mexico border near San Elizario, Texas. Capacity of the pipeline is 24,000 b/d. The LPG supplied to Mexico is a blend of approximately 85% propane and 15% butane. Before construction and operation of the pipeline, PGPB blended the propane-butane mix at a truck dock during loading. Demand for LPG in northern Mexico is strong. Less than 5% of the homes in Juarez have natural gas, making LPG the predominant energy source for cooking and heating in a city of more than 1 million. LPG also is widely used as a motor fuel.

Bodenhamer, K.C. [Mid-America Pipeline Co., Tulsa, OK (United States)

1997-08-11T23:59:59.000Z

153

INTERNAL REPAIR OF PIPELINES  

Science Conference Proceedings (OSTI)

The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. Development of a comprehensive test plan for this process is recommended for use in the field trial portion of this program.

Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

2004-08-17T23:59:59.000Z

154

INTERNAL REPAIR OF PIPELINES  

Science Conference Proceedings (OSTI)

The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. The first round of optimization and validation activities for carbon-fiber repairs are complete. Development of a comprehensive test plan for this process is recommended for use in the field trial portion of this program.

Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

2004-12-31T23:59:59.000Z

155

Application of solar energy to the supply of industrial hot water. Technical report 4  

SciTech Connect

A solar water heating and steam generating system is being designed for a California laundry. Progress reported includes completion of the analysis of the existing process services, determination of collectable solar energy at El Centro, California, selection of water as the heat transfer fluid in the 200/sup 0/F system and further analyses of heat transfer fluids for the 300/sup 0/F system, meetings and discussions with respect to system controls and monitoring and the collector support structure, and a proposal for the waste heat recovery system. (LEW)

1976-09-01T23:59:59.000Z

156

Many-objective de Novo water supply portfolio planning under deep uncertainty  

Science Conference Proceedings (OSTI)

This paper proposes and demonstrates a new interactive framework for sensitivity-informed de Novo planning to confront the deep uncertainty within water management problems. The framework couples global sensitivity analysis using Sobol' variance decomposition ... Keywords: Decision support, Many-objective decision analytics, Multiobjective evolutionary algorithms, Risk, Robust decision making, Sensitivity analysis, Uncertainty

Joseph R. Kasprzyk; Patrick M. Reed; Gregory W. Characklis; Brian R. Kirsch

2012-06-01T23:59:59.000Z

157

Assessing Consumer Values and the Supply-Chain Market for the Integrated Water Heater/Dehumidifier  

SciTech Connect

This paper presents a case study of the potential market for the dual-service residential integrated water heater/dehumidifier (WHD). Its principal purpose is to evaluate the extent to which this integrated appliance might penetrate the residential market sector, given current market trends, producer and consumer attributes, and technical parameters. The report's secondary purpose is to gather background information leading to a generic framework for conducting market analyses of technologies. This framework can be used to assess market readiness as well as factor preferred product attributes into the design to drive consumer demand for this product. This study also supports analysis for prototype design. A full market analysis for potential commercialization should be conducted after prototype development. The integrated WHD is essentially a heat-pump water heater (HPWH) with components and controls that allow dedicated dehumidification. Adequate residential humidity control is a growing issue for newly constructed residential homes, which are insulated so well that mechanical ventilation may be necessary to meet fresh air requirements. Leveraging its successful experience with the energy-efficient design improvement for the residential HPWH, the Oak Ridge National Laboratory's (ORNL's) Engineering Science and Technology Division's (ESTD's) Building Equipment Group designed a water-heating appliance that combines HPWH efficiency with dedicated dehumidification. This integrated appliance could be a low-cost solution for dehumidification and efficient electric water heating. ORNL is partnering with Western Carolina University, Asheville-Buncombe Technical Community College, American Carolina Stamping Company, and Clemson University to develop this appliance and assess its market potential. For practical purposes, consumers are indifferent to how water is heated but are very interested in product attributes such as initial first cost, operating cost, performance, serviceability, product size, and installation costs. The principal drivers for penetrating markets are demonstrating reliability, leveraging the dehumidification attributes of the integrated WHD, and creating programs that embrace first-cost and life-cycle cost principles.

Ashdown, BG

2005-01-11T23:59:59.000Z

158

BP and Hydrogen Pipelines  

NLE Websites -- All DOE Office Websites (Extended Search)

BP and Hydrogen Pipelines BP and Hydrogen Pipelines DOE Hydrogen Pipeline Working Group Workshop August 30-31, 2005 Gary P. Yoho, P.E. i l i * Green corporate philosophy and senior management commitment * Reduced greenhouse gas emissions nine years ahead of target * Alternatives to oil are a big part of BP' including natural gas, LNG, solar and hydrogen * Hydrogen Bus Project won Australia' prestigious environmental award * UK partnership opened the first hydrogen demonstration refueling station * Two hydrogen pipelines in Houston area BP Env ronmenta Comm tment s portfolio, s most BP' * li l " li i i * i l pl i i * Li l li l * " i i l i 2 i i ll i i l pl ifi i * 8" ly idl i i l s Hydrogen Pipelines Two nes, on y a brand new 12 ne s act ve Connect Houston area chem ca ant w th a ref nery nes come off a p

159

Capability Brief_Pipeline Safety Program.pub  

NLE Websites -- All DOE Office Websites (Extended Search)

Safety Program Safety Program Oak Ridge National Laboratory managed by UT-Battelle, LLC for the U.S. Department of Energy under Contract number DE-AC05-00OR22725 Research Areas Freight Flows Passenger Flows Supply Chain Efficiency Transportation: Energy Environment Safety Security Vehicle Technologies Capabilities Brief T he Oak Ridge National Laboratory (ORNL) provides specialized engineering and technical support to the U.S. Department of Transportation's Pipeline and Hazardous Materials Safety Administration (PHMSA). As a federal regulatory authority with jurisdiction over pipeline safety, PHMSA is responsible for ensuring the safe, reliable, and environmentally sound operation of the nation's network of natural gas and hazardous liquid pipelines. To

160

A Cheap Levitating Gas/Load Pipeline  

E-Print Network (OSTI)

Design of new cheap aerial pipelines, a large flexible tube deployed at high altitude, for delivery of natural (fuel) gas, water and other payload over a long distance is delineated. The main component of the natural gas is methane which has a specific weight less than air. A lift force of one cubic meter of methane equals approximately 0.5 kg (1 pound). The lightweight film flexible pipeline can be located in air at high altitude and, as such, does not damage the environment. Using the lift force of this pipeline and wing devices payloads of oil, water, or other fluids, or even solids such as coal, cargo, passengers can be delivered cheaply at long distance. This aerial pipeline dramatically decreases the cost and the time of construction relative to conventional pipelines of steel which saves energy and greatly lowers the capital cost of construction. The article contains a computed project for delivery 24 billion cubic meters of gas and tens of million tons of oil, water or other payload per year.

Alexander Bolonkin

2008-12-02T23:59:59.000Z

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

A Cheap Levitating Gas/Load Pipeline  

E-Print Network (OSTI)

Design of new cheap aerial pipelines, a large flexible tube deployed at high altitude, for delivery of natural (fuel) gas, water and other payload over a long distance is delineated. The main component of the natural gas is methane which has a specific weight less than air. A lift force of one cubic meter of methane equals approximately 0.5 kg (1 pound). The lightweight film flexible pipeline can be located in air at high altitude and, as such, does not damage the environment. Using the lift force of this pipeline and wing devices payloads of oil, water, or other fluids, or even solids such as coal, cargo, passengers can be delivered cheaply at long distance. This aerial pipeline dramatically decreases the cost and the time of construction relative to conventional pipelines of steel which saves energy and greatly lowers the capital cost of construction. The article contains a computed project for delivery 24 billion cubic meters of gas and tens of million tons of oil, water or other payload per year.

Bolonkin, Alexander

2008-01-01T23:59:59.000Z

162

Integration of supply and demand for water in central Illinois urban areas. Research report  

Science Conference Proceedings (OSTI)

Water demand functions were estimated using two sets of data for Central Illinois -- community-wide data and household data. The community-wide data consist of total residential consumption for each of four pre-selected medium-sized cities in Central Illinois. The household data consist of residents from five cities who responded to a mail survey. The study investigates comparability of parameter estimates from the two approaches. If the parameter estimates are comparable, it would suggest water demand estimates need not require costly and time-consuming household surveys. Estimates of price elasticity are negative and less than unitary based on the two data sets used. The estimated price elasticity based on community-wide data is -.037, while using household data estimated price elasticities are in the range from -.14 to -.16. The reasons for these differences are not immediately apparent and warrant further investigation.

Miranda, C.S.; Braden, J.B.; Martin, W.E.

1993-02-01T23:59:59.000Z

163

Application of solar energy to the supply of industrial hot water. Technical report 3  

SciTech Connect

A solar water heating and steam generating system is being developed for a California laundry. Progress reported includes accumulation of data on process usage and demands for the purpose of collector sizing, studies of insulation for piping and thermal storage tanks, investigation in the selection of the heat transfer fluid, and weather measurements. Further analyses on the supporting structure for the solar collector arrays are reported. A concept review meeting is discussed. (LEW)

1976-08-01T23:59:59.000Z

164

Economic viability of heat pump desuperheaters for supplying domestic hot water  

Science Conference Proceedings (OSTI)

The heat reclaimer is a heat exchange device that removes superheat from the refrigerant gas in a heat pump or central air conditioning unit and uses that extracted energy to heat water for domestic uses. This analysis examines the energy-saving potential and economic benefit of the heat reclaimer. Energy savings were calculated using a modified bin analytical technique. Economic viability was determined using the simple payback criterion. The analysis was performed for 28 cities in the United States to gain an understanding of the relationship between energy savings, economic viability, and climate. The results of the assessment indicate that the heat reclaimer has payback periods greater than seven years when compared with oil- or gas-fired water heating systems. Because of the long payback periods, the heat reclaimer does not appear to be economically feasible for these applications. However, when compared to electric-resistance water heating units, the heat reclaimer is economically viable, especially in areas where the air conditioning load is substantial or where the price of electricity is high.

Olszewski, M.

1984-01-01T23:59:59.000Z

165

Assessing Consumer Values and the Supply-Chain Market for the Integrated Water Heater/Dehumidifier  

SciTech Connect

This paper presents a case study of the potential market for the dual-service residential integrated water heater/dehumidifier (WHD). Its principal purpose is to evaluate the extent to which this integrated appliance might penetrate the residential market sector, given current market trends, producer and consumer attributes, and technical parameters. The report's secondary purpose is to gather background information leading to a generic framework for conducting market analyses of technologies. This framework can be used to assess market readiness as well as factor preferred product attributes into the design to drive consumer demand for this product. This study also supports analysis for prototype design. A full market analysis for potential commercialization should be conducted after prototype development. The integrated WHD is essentially a heat-pump water heater (HPWH) with components and controls that allow dedicated dehumidification. Adequate residential humidity control is a growing issue for newly constructed residential homes, which are insulated so well that mechanical ventilation may be necessary to meet fresh air requirements. Leveraging its successful experience with the energy-efficient design improvement for the residential HPWH, the Oak Ridge National Laboratory's (ORNL's) Engineering Science and Technology Division's (ESTD's) Building Equipment Group designed a water-heating appliance that combines HPWH efficiency with dedicated dehumidification. This integrated appliance could be a low-cost solution for dehumidification and efficient electric water heating. ORNL is partnering with Western Carolina University, Asheville-Buncombe Technical Community College, American Carolina Stamping Company, and Clemson University to develop this appliance and assess its market potential. For practical purposes, consumers are indifferent to how water is heated but are very interested in product attributes such as initial first cost, operating cost, performance, serviceability, product size, and installation costs. The principal drivers for penetrating markets are demonstrating reliability, leveraging the dehumidification attributes of the integrated WHD, and creating programs that embrace first-cost and life-cycle cost principles.

Ashdown, BG

2005-01-11T23:59:59.000Z

166

Sustainable water supply: rainwater harvesting for multistoried residential apartments in dhaka, bangladesh  

E-Print Network (OSTI)

Rainwater harvesting is a familiar term for Bangladesh. People in areas that lack drinking water, particularly the coastal areas and the rural areas in the country, practice rain water harvesting. The high annual rainfall in the country makes rainwater harvesting a logical solution for the arsenic contamination of ground water in Bangladesh (Rahman et al. 2003). Also, the increasing population in the urban as well as rural areas is putting increased load on underground aquifers which is evident in the fact that the piezometric level in Dhaka has decreased by more than 65 feet in the last decade. The annual rain fall that the city receives may be an effective answer to the recharge of aquifers. Rain water harvesting during the rainy season can reduce the increasing load on groundwater levels. This study aims to provide some guidelines for economic rainwater harvesting system, especially for urban areas for specific user groups. These guidelines were formulated through literature review, analysis of some case studies on rainwater harvesting, and, to a certain extent, practical experience of the researcher. Data from secondary sources have also been used for the purpose. The guidelines have been formulated using existing data on rainwater harvesting systems. Based on these guidelines, a mathematical model has been developed to figure out cistern sizes for collection of rainwater. The solution is applied to a typical plan of an apartment house in Dhaka (multistoried) using programming and visualization so as to demonstrate the scope and benefit of integration of rain water harvesting technique with the architectural design. The harvested rainwater definitely does not meet the basic domestic requirement, but supplements it during the rainy season which, most importantly, is usable for individual household use. Large-scale rainwater harvesting also, hopefully, results in a decrease of seasonal flooding in the urban areas. The products of this research are a) a computer program for sizing cisterns and b) an animation of the proposed rainwater harvesting system that may be used as a tool to demonstrate the benefits of the technique.

Sultana, Farzana

2007-12-01T23:59:59.000Z

167

Virtual Pipeline System Testbed to Optimize the U.S. Natural Gas Transmission Pipeline System  

SciTech Connect

The goal of this project is to develop a Virtual Pipeline System Testbed (VPST) for natural gas transmission. This study uses a fully implicit finite difference method to analyze transient, nonisothermal compressible gas flow through a gas pipeline system. The inertia term of the momentum equation is included in the analysis. The testbed simulate compressor stations, the pipe that connects these compressor stations, the supply sources, and the end-user demand markets. The compressor station is described by identifying the make, model, and number of engines, gas turbines, and compressors. System operators and engineers can analyze the impact of system changes on the dynamic deliverability of gas and on the environment.

Kirby S. Chapman; Prakash Krishniswami; Virg Wallentine; Mohammed Abbaspour; Revathi Ranganathan; Ravi Addanki; Jeet Sengupta; Liubo Chen

2005-06-01T23:59:59.000Z

168

EIA - Natural Gas Pipeline Network - Pipeline Capacity and Utilization  

U.S. Energy Information Administration (EIA) Indexed Site

Pipeline Utilization & Capacity Pipeline Utilization & Capacity About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Pipeline Capacity & Utilization Overview | Utilization Rates | Integration of Storage | Varying Rates of Utilization | Measures of Utilization Overview of Pipeline Utilization Natural gas pipeline companies prefer to operate their systems as close to full capacity as possible to maximize their revenues. However, the average utilization rate (flow relative to design capacity) of a natural gas pipeline system seldom reaches 100%. Factors that contribute to outages include: Scheduled or unscheduled maintenance Temporary decreases in market demand Weather-related limitations to operations

169

GAS PIPELINE PIGABILITY  

Science Conference Proceedings (OSTI)

In-line inspection equipment is commonly used to examine a large portion of the long distance transmission pipeline system that transports natural gas from well gathering points to local distribution companies. A piece of equipment that is inserted into a pipeline and driven by product flow is called a ''pig''. Using this term as a base, a set of terms has evolved. Pigs that are equipped with sensors and data recording devices are called ''intelligent pigs''. Pipelines that cannot be inspected using intelligent pigs are deemed ''unpigable''. But many factors affect the passage of a pig through a pipeline, or the ''pigability''. The pigability pipeline extend well beyond the basic need for a long round hole with a means to enter and exit. An accurate assessment of pigability includes consideration of pipeline length, attributes, pressure, flow rate, deformation, cleanliness, and other factors as well as the availability of inspection technology. All factors must be considered when assessing the appropriateness of ILI to assess specific pipeline threats.

Ted Clark; Bruce Nestleroth

2004-04-01T23:59:59.000Z

170

Overview of interstate hydrogen pipeline systems.  

DOE Green Energy (OSTI)

The use of hydrogen in the energy sector of the United States is projected to increase significantly in the future. Current uses are predominantly in the petroleum refining sector, with hydrogen also being used in the manufacture of chemicals and other specialized products. Growth in hydrogen consumption is likely to appear in the refining sector, where greater quantities of hydrogen will be required as the quality of the raw crude decreases, and in the mining and processing of tar sands and other energy resources that are not currently used at a significant level. Furthermore, the use of hydrogen as a transportation fuel has been proposed both by automobile manufacturers and the federal government. Assuming that the use of hydrogen will significantly increase in the future, there would be a corresponding need to transport this material. A variety of production technologies are available for making hydrogen, and there are equally varied raw materials. Potential raw materials include natural gas, coal, nuclear fuel, and renewables such as solar, wind, or wave energy. As these raw materials are not uniformly distributed throughout the United States, it would be necessary to transport either the raw materials or the hydrogen long distances to the appropriate markets. While hydrogen may be transported in a number of possible forms, pipelines currently appear to be the most economical means of moving it in large quantities over great distances. One means of controlling hydrogen pipeline costs is to use common rights-of-way (ROWs) whenever feasible. For that reason, information on hydrogen pipelines is the focus of this document. Many of the features of hydrogen pipelines are similar to those of natural gas pipelines. Furthermore, as hydrogen pipeline networks expand, many of the same construction and operating features of natural gas networks would be replicated. As a result, the description of hydrogen pipelines will be very similar to that of natural gas pipelines. The following discussion will focus on the similarities and differences between the two pipeline networks. Hydrogen production is currently concentrated in refining centers along the Gulf Coast and in the Farm Belt. These locations have ready access to natural gas, which is used in the steam methane reduction process to make bulk hydrogen in this country. Production centers could possibly change to lie along coastlines, rivers, lakes, or rail lines, should nuclear power or coal become a significant energy source for hydrogen production processes. Should electrolysis become a dominant process for hydrogen production, water availability would be an additional factor in the location of production facilities. Once produced, hydrogen must be transported to markets. A key obstacle to making hydrogen fuel widely available is the scale of expansion needed to serve additional markets. Developing a hydrogen transmission and distribution infrastructure would be one of the challenges to be faced if the United States is to move toward a hydrogen economy. Initial uses of hydrogen are likely to involve a variety of transmission and distribution methods. Smaller users would probably use truck transport, with the hydrogen being in either the liquid or gaseous form. Larger users, however, would likely consider using pipelines. This option would require specially constructed pipelines and the associated infrastructure. Pipeline transmission of hydrogen dates back to late 1930s. These pipelines have generally operated at less than 1,000 pounds per square inch (psi), with a good safety record. Estimates of the existing hydrogen transmission system in the United States range from about 450 to 800 miles. Estimates for Europe range from about 700 to 1,100 miles (Mohipour et al. 2004; Amos 1998). These seemingly large ranges result from using differing criteria in determining pipeline distances. For example, some analysts consider only pipelines above a certain diameter as transmission lines. Others count only those pipelines that transport hydrogen from a producer to a customer (e.g., t

Gillette, J .L.; Kolpa, R. L

2008-02-01T23:59:59.000Z

171

Composites Technology for Hydrogen Pipelines  

E-Print Network (OSTI)

Composites Technology for Hydrogen Pipelines Barton Smith, Barbara Frame, Larry Anovitz and Cliff Eberle Oak Ridge National Laboratory Pipeline Working Group MeetingPipeline Working Group Meeting Aiken;Composites Technology for Hydrogen Pipelines Fiber-reinforced polymer pipe Project Overview: Investigate

172

Code for Hydrogen Hydrogen Pipeline  

E-Print Network (OSTI)

#12;2 Code for Hydrogen Pipelines Hydrogen Pipeline Working Group Workshop Augusta, Georgia August development · Charge from BPTCS to B31 Standards Committee for Hydrogen Piping/Pipeline code development · B31.12 Status & Structure · Hydrogen Pipeline issues · Research Needs · Where Do We Go From Here? #12;4 Code

173

DOE Hydrogen Pipeline Working Group Workshop  

E-Print Network (OSTI)

DOE Hydrogen Pipeline Working Group Workshop August 31, 2005 Augusta, Georgia #12;Hydrogen Pipeline Experience Presented By: LeRoy H. Remp Lead Project Manager Pipeline Projects #12;ppt00 3 Hydrogen Pipeline and the customer. #12;ppt00 4 Pipeline Photos #12;ppt00 5 Pipeline Photos #12;ppt00 6 Pipeline Photos #12;ppt00 7

174

Annual fuel usage charts for oil-fired boilers. [Building space heating and hot water supplies  

SciTech Connect

On the basis of laboratory-determined boiler efficiency data, one may calculate the annual fuel usage (AFU) for any oil-fired boiler, serving a structure of a given design heat load, for any specified hourly weather pattern. Further, where data are available regarding the energy recapture rates of the strucutre due to direct gain solar energy (windows), lighting, cooking, electrical appliances, metabolic processes, etc., the annual fuel usage savings due to such (re) capture are straightforwardly determinable. Employing the Brookhaven National Laboratory annual fuel usage formulation, along with efficiency data determined in the BNL Boiler Laboratory, computer-drawn annual fuel usage charts can be generated for any selected boiler for a wide range of operating conditions. For two selected boilers operating in any one of the hour-by-hour weather patterns which characterize each of six cities over a wide range of firing rates, domestic hot water consumption rates, design heat loads, and energy (re) capture rates, annual fuel usages are determined and graphically presented. Figures 1 to 98, inclusive, relate to installations for which energy recapture rates are taken to be zero. Figures 97 to 130, inclusive, apply to a range of cases for which energy recapture rates are nonzero and determinable. In all cases, simple, direct and reliable annual fuel usage values can be determined by use of charts and methods such as those illustrated.

Berlad, A.L.; Yeh, Y.J.; Salzano, F.J.; Hoppe, R.J.; Batey, J.

1978-07-01T23:59:59.000Z

175

Hydrogen Pipeline Discussion  

NLE Websites -- All DOE Office Websites (Extended Search)

praxair.com praxair.com Copyright © 2003, Praxair Technology, Inc. All rights reserved. Hydrogen Pipeline Discussion BY Robert Zawierucha, Kang Xu and Gary Koeppel PRAXAIR TECHNOLOGY CENTER TONAWANDA, NEW YORK DOE Hydrogen Pipeline Workshop Augusta, GA August 2005 2 Introduction Regulatory and technical groups that impact hydrogen and hydrogen systems ASME, DOE, DOT etc, Compressed Gas Association activities ASTM TG G1.06.08 Hydrogen pipelines and CGA-5.6 Selected experience and guidance Summary and recommendations 3 CGA Publications Pertinent to Hydrogen G-5: Hydrogen G-5.3: Commodity Specification for Hydrogen G-5.4: Standard for Hydrogen Piping at Consumer Locations G-5.5: Hydrogen Vent Systems G-5.6: Hydrogen Pipeline Systems (IGC Doc 121/04/E) G-5.7: Carbon Monoxide and Syngas

176

Highly Pipelined Asynchronous FPGAs  

E-Print Network (OSTI)

We present the design of a high-performance, highly pipelined asynchronous FPGA. We describe a very ne-grain pipelined logic block and routing interconnect architecture, and show how asynchronous logic can eciently take advantage of this large amount of pipelining. Our FPGA, which does not use a clock to sequence computations, automatically \\selfpipelines " its logic without the designer needing to be explicitly aware of all pipelining details. This property makes our FPGA ideal for throughput-intensive applications and we require minimal place and route support to achieve good performance. Benchmark circuits taken from both the asynchronous and clocked design communities yield throughputs in the neighborhood of 300-400 MHz in a TSMC 0.25m process and 500-700 MHz in a TSMC 0.18m process.

John Teifel; Rajit Manohar

2004-01-01T23:59:59.000Z

177

Synchronous interlocked pipelines  

E-Print Network (OSTI)

In a circuit environment that is becoming increasingly sensitive to dynamic power dissipation and noise, and where cycle time available for control decisions continues to decrease, locality principles are becoming paramount in controlling advancement of data through pipelined systems. Achieving fine grained power down and progressive pipeline stalls at the local stage level is therefore becoming increasingly important to enable lower dynamic power consumption while keeping introduced switching noise under control as well as avoiding global distribution of timing critical stall signals. It has long been known that the interlocking properties of asynchronous pipelined systems have a potential to provide such benefits. However, it has not been understood how such interlocking can be achieved in synchronous pipelines. This paper

Hans M. Jacobson; Prabhakar N. Kudva; Pradip Bose; Peter W. Cook; Stanley E. Schuster

2002-01-01T23:59:59.000Z

178

Synchronous Interlocked Pipelines  

E-Print Network (OSTI)

In a circuit environment that is becoming increasingly sensitive to dynamic power dissipation and noise, and where cycle time available for control decisions continues to decrease, locality principles are becoming paramount in controlling advancement of data through pipelined systems. Achieving fine grained power down and progressive pipeline stalls at the local stage level is therefore becoming increasingly important to enable lower dynamic power consumption while keeping introduced switching noise under control as well as avoiding global distribution of timing critical stall signals.

Hans Jacobson Prabhakar; Hans M. Jacobson; Prabhakar N. Kudva; Pradip Bose; Peter W. Cook; Stanley E. Schuster; Eric G. Mercer; Chris J. Myers

2001-01-01T23:59:59.000Z

179

Capturing Latino Students in the Academic Pipeline  

E-Print Network (OSTI)

The Latino Educational Pipeline Why Latino Students are atSTUDENTS IN THE ACADEMIC PIPELINE CAPTURING LATINO STUDENTSIN THE ACADEMIC PIPELINE Patricia Gcindara, Editor Katherine

Gándara, Patricia; Larson, Katherine; Mehan, Hugh; Rumberger, Russell

1998-01-01T23:59:59.000Z

180

Total Crude by Pipeline  

U.S. Energy Information Administration (EIA) Indexed Site

Product: Total Crude by All Transport Methods Domestic Crude by All Transport Methods Foreign Crude by All Transport Methods Total Crude by Pipeline Domestic Crude by Pipeline Foreign Crude by Pipeline Total Crude by Tanker Domestic Crude by Tanker Foreign Crude by Tanker Total Crude by Barge Domestic Crude by Barge Foreign Crude by Barge Total Crude by Tank Cars (Rail) Domestic Crude by Tank Cars (Rail) Foreign Crude by Tank Cars (Rail) Total Crude by Trucks Domestic Crude by Trucks Foreign Crude by Trucks Period: Product: Total Crude by All Transport Methods Domestic Crude by All Transport Methods Foreign Crude by All Transport Methods Total Crude by Pipeline Domestic Crude by Pipeline Foreign Crude by Pipeline Total Crude by Tanker Domestic Crude by Tanker Foreign Crude by Tanker Total Crude by Barge Domestic Crude by Barge Foreign Crude by Barge Total Crude by Tank Cars (Rail) Domestic Crude by Tank Cars (Rail) Foreign Crude by Tank Cars (Rail) Total Crude by Trucks Domestic Crude by Trucks Foreign Crude by Trucks Period: Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Product Area 2007 2008 2009 2010 2011 2012 View

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Status of Natural Gas Pipeline System Capacity Entering the 2000-2001 Heating Season  

Reports and Publications (EIA)

This special report looks at the capabilities of the national natural gas pipeline network in 2000 and provides an assessment of the current levels of available capacity to transport supplies from production areas to markets throughout the United States during the upcoming heating season. It also examines how completion of currently planned expansion projects and proposed new pipelines would affect the network.

Information Center

2000-10-01T23:59:59.000Z

182

Look at Western Natural Gas Infrastructure During the Recent El Paso Pipeline Disruption, A  

Reports and Publications (EIA)

This special report looks at the capabilities of the national natural gas pipeline network in 2000 and provides an assessment of the current levels of available capacity to transport supplies from production areas to markets throughout the United States during the upcoming heating season. It also examines how completion of currently planned expansion projects and proposed new pipelines would affect the network.

Information Center

2000-11-01T23:59:59.000Z

183

Lab Supplies  

Science Conference Proceedings (OSTI)

reference materials, bleaching clay, activated bleaching earth and refining cups. Lab Supplies Lab Supplies Lab Supplies Laboratory Services analysis analytical methods aocs certified Certified Reference Materials (CRM) chemist chemists fats lab

184

An Economical Decision Model for Water Pipe Replacement Using the Bayesian Theory  

Science Conference Proceedings (OSTI)

According to the limited annual budget for pipeline replacement, the most effective and economical plan is needed to available fund. A variety of factors contribute to pipe breaks, including pipe material, diameter, outer coating, operation pressure, ... Keywords: Bayesian theory, Pipe replacement, Water supply system, Economic, Break factor

Wang Chenwan, Tianqing, Li Ridong, Wei Hongyu

2013-01-01T23:59:59.000Z

185

Application of solar energy to the supply of industrial process hot water. Aerotherm final report, 77-235. [Can washing in Campbell Soup plant  

DOE Green Energy (OSTI)

The objectives of the Solar Industrial Process Hot Water Program are to design, test, and evaluate the application of solar energy to the generation and supply of industrial process hot water, and to provide an assessment of the economic and resource benefits to be gained. Other objectives are to stimulate and give impetus to the use of solar energy for supplying significant amounts of industrial process heat requirements. The plant selected for the design of a solar industrial process hot water system was the Campbell Soup facility in Sacramento, California. The total hot water demand for this plant varies between 500 and 800 gpm during regular production shifts, and hits a peak of over 1,000 gpm for approximately one hour during the cleanup shift. Most of the hot water is heated in the boiler room by a combination of waste heat recovery and low pressure (5 psi) steam-water heat exchangers. The hot water emerges from the boiler room at a temperature between 160/sup 0/F and 180/sup 0/F and is transported to the various process areas. Booster heaters in the process areas then use low pressure (5 psi) or medium pressure (20 psi) steam to raise the temperature of the water to the level required for each process. Hot water is used in several processes at the Campbell Soup plant, but the can washing process was selected to demonstrate the feasibility of a solar hot water system. A detailed design and economic analysis of the system is given. (WHK)

None

1977-01-01T23:59:59.000Z

186

Coal slurry pipelines: a maze of rights  

SciTech Connect

A survey of coal slurry pipeline projects, discussed at the 4th Annual International Slurry Transportation Conference showed that Energy Transportation Systems Inc. has effectively solved the right-of-way problem for its 1400 mi line from Wyoming's Powder River Basin and expects to have an environmental impact statement completed within 30 mo and have the pipeline in operation by 1983. San Marco Pipeline Co., is developing a source of water from wells drilled near Alamosa, Colo., for use in a proposed line from Walsenburg, Colo., to Houston. The Alton pipeline from the Alton coal field in southern Utah to power stations in southern Nevada is delayed by right-of-way needs through federal land and by changing environmental requirements. Florida Gas Co., is working on alternative projects to bring coal to Florida by pipeline. Northwest Energy Co.'s proposed slurry line from Gillette, Wyo., to Boise, Idaho, and Boardman, Oreg., is in a holding position. Texas Eastern Transmission Co. hopes to have a 1300 mi 38 in. line in operation in 1985 from Wyoming's Powder River Basin to the Houston area.

1979-08-01T23:59:59.000Z

187

A Low-Cost Natural Gas/Freshwater Aerial Pipeline  

E-Print Network (OSTI)

Offered is a new type of low-cost aerial pipeline for delivery of natural gas, an important industrial and residential fuel, and freshwater as well as other payloads over long distances. The offered pipeline dramatically decreases the construction and operation costs and the time necessary for pipeline construction. A dual-use type of freight pipeline can improve an arid rural environment landscape and provide a reliable energy supply for cities. Our aerial pipeline is a large, self-lofting flexible tube disposed at high altitude. Presently, the term "natural gas" lacks a precise technical definition, but the main components of natural gas are methane, which has a specific weight less than air. A lift force of one cubic meter of methane equals approximately 0.5 kg. The lightweight film flexible pipeline can be located in the Earth-atmosphere at high altitude and poses no threat to airplanes or the local environment. The authors also suggest using lift force of this pipeline in tandem with wing devices for che...

Bolonkin, A; Bolonkin, Alexander; Cathcart, Richard

2007-01-01T23:59:59.000Z

188

Growing demand for gas spawns pipeline projects  

Science Conference Proceedings (OSTI)

This paper reports that burgeoning demand for gas is fueling pipeline construction in Eastern and Western hemispheres. In the East, the North Sea is the focal point for activity. And in the West, the U.S. gas market is the power behind construction. As predictions of U.S. gas demand increase, Canadian pipeliners adjust expansion plans to be ready to capture greater shares of markets. Canada's TransCanada Pipelines Ltd. is racing to step up its share of the U.S. market. TransCanada's Western Gas Marketing Ltd. sold 242.3 bcf of gas in the 3 months ended last June 30, a 9.8% increase from last year. TransCanada reported lower volumes sold into Canadian markets, while exports into the U.S. continued to rise. Gas Research Institute (GRI) projects Canadian gas exports to the U.S. by 2000 will reach 2 tcf/year and LNG exports 800 bcf/year. U.S. gas supplies could increase to 23.9 tcf/year by 2010, mostly from Lower 48 production. GRI says supplies from Canada will make up the balance. In the past 2 years, TransCanada has spent about $1 billion expanding its interprovincial main line system.

Not Available

1991-09-09T23:59:59.000Z

189

The as-laid embedment of subsea pipelines /by Zachary J. Westgate.  

E-Print Network (OSTI)

??The behaviour of a subsea pipeline is strongly influenced by its level of embedment into the seabed. In deep water, the in-service embedment of a… (more)

Westgate, Zachary J.

2013-01-01T23:59:59.000Z

190

Pipeline issues shape southern FSU oil, gas development  

SciTech Connect

To future production from southern republics of the former Soviet Union (FSU), construction and revitalization of pipelines are as important as the supply of capital. Export capacity will limit production and slow development activity in the region until new pipelines are in place. Plenty of pipeline proposals have come forward. The problem is politics, which for every proposal so far complicates routing or financing or both. Russia has made clear its intention to use pipeline route decisions to retain influence in the region. As a source of external pressure, it is not alone. Iran and Turkey also have made strong bids for the southern FSU`s oil and gas transport business. Diplomacy thus will say as much as commerce does about how transportation issues are settled and how quickly the southern republics move toward their potentials to produce oil and gas. The paper discusses possible routes and the problems with them, the most likely proposal, and future oil flows.

NONE

1995-05-22T23:59:59.000Z

191

Pipeline bottoming cycle study. Final report  

Science Conference Proceedings (OSTI)

The technical and economic feasibility of applying bottoming cycles to the prime movers that drive the compressors of natural gas pipelines was studied. These bottoming cycles convert some of the waste heat from the exhaust gas of the prime movers into shaft power and conserve gas. Three typical compressor station sites were selected, each on a different pipeline. Although the prime movers were different, they were similar enough in exhaust gas flow rate and temperature that a single bottoming cycle system could be designed, with some modifications, for all three sites. Preliminary design included selection of the bottoming cycle working fluid, optimization of the cycle, and design of the components, such as turbine, vapor generator and condensers. Installation drawings were made and hardware and installation costs were estimated. The results of the economic assessment of retrofitting bottoming cycle systems on the three selected sites indicated that profitability was strongly dependent upon the site-specific installation costs, how the energy was used and the yearly utilization of the apparatus. The study indicated that the bottoming cycles are a competitive investment alternative for certain applications for the pipeline industry. Bottoming cycles are technically feasible. It was concluded that proper design and operating practices would reduce the environmental and safety hazards to acceptable levels. The amount of gas that could be saved through the year 2000 by the adoption of bottoming cycles for two different supply projections was estimated as from 0.296 trillion ft/sup 3/ for a low supply projection to 0.734 trillion ft/sup 3/ for a high supply projection. The potential market for bottoming cycle equipment for the two supply projections varied from 170 to 500 units of varying size. Finally, a demonstration program plan was developed.

Not Available

1980-06-01T23:59:59.000Z

192

Pipeline Setback Ordinance (Minnesota) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sites Power Marketing Administration Other Agencies You are here Home Savings Pipeline Setback Ordinance (Minnesota) Pipeline Setback Ordinance (Minnesota) Eligibility...

193

Dataplot Commands for Alaska Pipeline Case Study  

Science Conference Proceedings (OSTI)

Dataplot Commands for Alaska Pipeline Case Study. Set Software Options and Get Started, . . Starting Alaska Pipeline Calibration Case Study . . ...

2012-03-31T23:59:59.000Z

194

Collaborative Visualization and the Analysis Pipeline | Argonne...  

NLE Websites -- All DOE Office Websites (Extended Search)

Science & Engineering Applications Collaborative Visualization and the Analysis Pipeline Collaborative Visualization and the Analysis Pipeline Integration of Access Grid and...

195

Energy consumption in the pipeline industry  

SciTech Connect

Estimates are developed of the energy consumption and energy intensity (EI) of five categories of U.S. pipeline industries: natural gas, crude oil, petroleum products, coal slurry, and water. For comparability with other transportation modes, it is desirable to calculate EI in Btu/Ton-Mile, and this is done, although the necessary unit conversions introduce additional uncertainties. Since water and sewer lines operate by lift and gravity, a comparable EI is not definable.

Banks, W. F.

1977-12-31T23:59:59.000Z

196

Operation chaining asynchronous pipelined circuits  

Science Conference Proceedings (OSTI)

We define operation chaining (op-chaining) as an optimization problem to determine the optimal pipeline depth for balancing performance against energy demands in pipelined asynchronous designs. Since there are no clock period requirements, asynchronous ...

Girish Venkataramani; Seth C. Goldstein

2007-11-01T23:59:59.000Z

197

Application of solar energy to the supply of industrial hot water. Volume 1. Final design report. [For American Linen Supply laundry in El Centro, California  

SciTech Connect

The conceptual design of a solar system for integration into the process hot water and steam services for the laundry facility, American Linen Sypply, located in El Centro, California is presented. A tracking parabolic collector array and thermal storage tanks will be used. Process analysis, instrumentation for control and data analysis, construction, maintenance and safety, energy reduction analysis, and economic analysis are described. A waste heat reclamation system is included in the design. (WHK)

1977-01-31T23:59:59.000Z

198

Oil-derivatives pipeline logistics using discrete-event simulation  

Science Conference Proceedings (OSTI)

The management of oil-product pipelines represents a critical task in the daily operation of petroleum supply chains. Efficient computational tools are needed to perform this activity in a reliable and cost-effective manner. This work presents a novel ...

Vanina G. Cafaro; Diego C. Cafaro; Carlos A. Méndez; Jaime Cerdá

2010-12-01T23:59:59.000Z

199

Using Natural Gas Transmission Pipeline Costs to Estimate Hydrogen Pipeline Costs  

E-Print Network (OSTI)

cost dependent on pipeline length and diameter against thedescribe with only the pipeline length and diameter. Labordescribed by the pipeline diameter and length alone. In some

Parker, Nathan

2004-01-01T23:59:59.000Z

200

Causes of Pipeline Failures  

Science Conference Proceedings (OSTI)

Table 1   Types of defects that can cause pipeline failures...pipe body Mechanical damage Environmental causes Corrosion (external or internal) Hydrogen-stress cracking External stress corrosion cracking Internal sulfide-stress cracking Hydrogen blistering Fatigue Miscellaneous causes Secondary loads Weldments to pipe surface Wrinkle bends Internal combustion...

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

New Materials for Hydrogen Pipelines  

NLE Websites -- All DOE Office Websites (Extended Search)

OAK OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY New Materials for Hydrogen Pipelines New Materials for Hydrogen Pipelines Barton Smith, Barbara Frame, Cliff Eberle, Larry Anovitz, James Blencoe and Tim Armstrong Oak Ridge National Laboratory Jimmy Mays University of Tennessee, Knoxville Hydrogen Pipeline Working Group Meeting August 30-31, 2005 Augusta, Georgia 2 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Overview Overview - - Barriers and Technical Targets Barriers and Technical Targets * Barriers to Hydrogen Delivery - Existing steel pipelines are subject to hydrogen embrittlement and are inadequate for widespread H 2 distribution. - Current joining technology (welding) for steel pipelines is major cost factor and can exacerbate hydrogen embrittlement issues.

202

Mobile sensor network to monitor wastewater collection pipelines  

E-Print Network (OSTI)

Advanced pipeline monitoringDesign of mobile pipeline floating sensor “SewerSnortIllustration of mobile pipeline floating sensor monitoring

Lim, Jungsoo

2012-01-01T23:59:59.000Z

203

The SINFONI pipeline  

E-Print Network (OSTI)

The SINFONI data reduction pipeline, as part of the ESO-VLT Data Flow System, provides recipes for Paranal Science Operations, and for Data Flow Operations at Garching headquarters. At Paranal, it is used for the quick-look data evaluation. For Data Flow Operations, it fulfills several functions: creating master calibrations; monitoring instrument health and data quality; and reducing science data for delivery to service mode users. The pipeline is available to the science community for reprocessing data with personalised reduction strategies and parameters. The pipeline recipes can be executed either with EsoRex at the command line level or through the Gasgano graphical user interface. The recipes are implemented with the ESO Common Pipeline Library (CPL). SINFONI is the Spectrograph for INtegral Field Observations in the Near Infrared (1.1-2.45 um) at the ESO-VLT. SINFONI was developed and build by ESO and MPE in collaboration with NOVA. It consists of the SPIFFI integral field spectrograph and an adaptive optics module which allows diffraction limited and seeing limited observations. The image slicer of SPIFFI chops the SINFONI field of view on the sky in 32 slices which are re-arranged to a pseudo slit. The latter is dispersed by one of the four possible gratings (J, H, K, H+K). The detector thus sees a spatial dimension (along the pseudo-slit) and a spectral dimension. We describe in this paper the main data reduction procedures of the SINFONI pipeline, which is based on SPRED - the SPIFFI data reduction software developed by MPE, and the most recent developments after more than a year of SINFONI operations.

Andrea Modigliani; Wolfgang Hummel; Roberto Abuter; Paola Amico; Pascal Ballester; Richard Davies; Christophe Dumas; Mattew Horrobin; Mark Neeser; Markus Kissler-Patig; Michele Peron; Juha Rehunanen; Juergen Schreiber; Thomas Szeifert

2007-01-10T23:59:59.000Z

204

Power Supplies  

Science Conference Proceedings (OSTI)

Figure: ...Fig. 5 Typical medium-frequency induction power supply incorporating (a) a parallel inverter and (b) a series inverter...

205

Enhancing protection for unusually sensitive ecological areas from pipeline releases  

E-Print Network (OSTI)

ECOLOGICAL AREAS FROM PIPELINE RELEASES Christina Sames;Administration, Office of Pipeline Safety, DPS-10/ 400 7thof a hazardous liquid pipeline accident. Pipeline operators

Sames, Christina; Fink, Dennis

2001-01-01T23:59:59.000Z

206

The Management of International Rivers as Demands Grow and Supplies Tighten: India, China, Nepal, Pakistan, Bangladesh  

E-Print Network (OSTI)

hydro. International Hydro Power and Dam Construction.suggested) Supply of hydro-electric power * Supply of waterrights ? Supply of hydro-electric power ? Supply of water

Crow, Ben; Singh, Nirvikar

2009-01-01T23:59:59.000Z

207

Analysis of Restricted Natural Gas Supply Cases  

Reports and Publications (EIA)

The four cases examined in this study have progressively greater impacts on overall natural gas consumption, prices, and supply. Compared to the Annual Energy Outlook 2004 reference case, the no Alaska pipeline case has the least impact; the low liquefied natural gas case has more impact; the low unconventional gas recovery case has even more impact; and the combined case has the most impact.

James Kendell

2004-03-01T23:59:59.000Z

208

A Systems-Integration Approach to the Optimal Design and Operation of Macroscopic Water Desalination and Supply Networks.  

E-Print Network (OSTI)

??With the escalating levels of water demand, there is a need for expansion in the capacity of water desalination infrastructure and for better management and… (more)

Atilhan, Selma

2012-01-01T23:59:59.000Z

209

Hydrogen Pipeline Working Group Workshop: Code for Hydrogen Pipelines  

NLE Websites -- All DOE Office Websites (Extended Search)

Code for Hydrogen Code for Hydrogen Pipelines Hydrogen Pipeline Working Group Workshop Augusta, Georgia August 31, 2005 Louis Hayden, PE Chair ASME B31.12 3 Presentation Outline * Approval for new code development * Charge from BPTCS to B31 Standards Committee for Hydrogen Piping/Pipeline code development * B31.12 Status & Structure * Hydrogen Pipeline issues * Research Needs * Where Do We Go From Here? 4 Code for Hydrogen Piping and Pipelines * B31 Hydrogen Section Committee to develop a new code for H 2 piping and pipelines - Include requirements specific to H 2 service for power, process, transportation, distribution, commercial, and residential applications - Balance reference and incorporation of applicable sections of B31.1, B31.3 and B31.8 - Have separate parts for industrial, commercial/residential

210

Instrumented Pipeline Initiative  

Science Conference Proceedings (OSTI)

This report summarizes technical progress achieved during the cooperative agreement between Concurrent Technologies Corporation (CTC) and U.S. Department of Energy to address the need for a for low-cost monitoring and inspection sensor system as identified in the Department of Energy (DOE) National Gas Infrastructure Research & Development (R&D) Delivery Reliability Program Roadmap.. The Instrumented Pipeline Initiative (IPI) achieved the objective by researching technologies for the monitoring of pipeline delivery integrity, through a ubiquitous network of sensors and controllers to detect and diagnose incipient defects, leaks, and failures. This report is organized by tasks as detailed in the Statement of Project Objectives (SOPO). The sections all state the objective and approach before detailing results of work.

Thomas Piro; Michael Ream

2010-07-31T23:59:59.000Z

211

EIA - Natural Gas Pipeline Network - Natural Gas Pipeline Development &  

U.S. Energy Information Administration (EIA) Indexed Site

Pipelinesk > Development & Expansion Pipelinesk > Development & Expansion About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Pipeline Development and Expansion Timing | Determining Market Interest | Expansion Options | Obtaining Approval | Prefiling Process | Approval | Construction | Commissioning Timing and Steps for a New Project An interstate natural gas pipeline construction or expansion project takes an average of about three years from the time it is first announced until the new pipe is placed in service. The project can take longer if it encounters major environmental obstacles or public opposition. A pipeline development or expansion project involves several steps: Determining demand/market interest

212

EIA - Natural Gas Pipeline Network - Natural Gas Pipeline ...  

U.S. Energy Information Administration (EIA)

Home > Natural Gas > About U.S. Natural Gas Pipelines > U.S ... The EIA has determined that the informational map displays here do not raise security ...

213

Pipelines (Minnesota) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pipelines (Minnesota) Pipelines (Minnesota) Pipelines (Minnesota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State Minnesota Program Type Siting and Permitting This section regulates pipelines that are used to carry natural or synthetic gas at a pressure of more than 90 pounds per square inch, along with pipelines used to carry petroleum products and coal. Special rules apply to pipelines used to carry natural gas at a pressure of more than 125

214

Supply Implications  

U.S. Energy Information Administration (EIA)

Supply Implications. European export gasoline volumes likely to remain unchanged Uncertainties are weighted towards less availability But the quality of the available ...

215

Economic and Financial Costs of Saving Water and Energy: Preliminary Analysis for Hidalgo County Irrigation District No. 2 (San Juan) – Replacement of Pipeline Units I-7A, I-18, and I-22  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a three-component capital renovation project proposed by Hidalgo County Irrigation District No. 2. The proposed project primarily consists of replacing aged mortar-joint pipe in pipeline units I-7A, I-18, and I-22 with new rubber-gasketed, reinforced concrete pipe. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated useful life for the proposed project. Sensitivity results for the cost of saving water are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 485 ac-ft of water per year and 179,486,553 BTUs {52,604 kwh} of energy per year. The calculated economic and financial cost-of-saving water is estimated to be $385.46 per ac-ft. The calculated economic and financial cost-of-saving energy is estimated to be $0.0010735 per BTU {$3.663 per kwh}. In addition, expected real (vs. nominal) values are provided for the U.S. Bureau of Reclamation’s three principal evaluation measures specified in U.S. Public Law 106-576. The aggregate initial construction cost per ac-ft of water saved measure is $510.92. The aggregate initial construction cost per unit of energy saved measure is $0.0013798 per BTU {$4.708 per kwh}. The aggregate ratio of initial construction costs per dollar of total annual economic savings is estimated to be -2.53.

Sturdivant, Allen W.; Rister, M. Edward; Lacewell, Ronald D.

2007-06-01T23:59:59.000Z

216

Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation  

NLE Websites -- All DOE Office Websites (Extended Search)

Embrittlement Embrittlement of Pipeline Steels: Causes and Remediation P. Sofronis, I. M. Robertson, D. D. Johnson University of Illinois at Urbana-Champaign Hydrogen Pipeline Working Group Workshop Augusta, GA, August 30, 2005 Funding and Duration * Timeline - Project start date: 7/20/05 - Project end date: 7/19/09 - Percent complete: 0.1% * Budget: Total project funding: 300k/yr * DOE share: 75% * Contractor share: 25% * Barriers - Hydrogen embrittlement of pipelines and remediation (mixing with water vapor?) - Assessment of hydrogen compatibility of the existing natural gas pipeline system for transporting hydrogen - Suitable steels, and/or coatings, or other materials to provide safe and reliable hydrogen transport and reduced capital cost 2 Team and Collaborators 3 * Industrial Partners: SECAT

217

Natural Gas Pipeline & Distribution Use  

Gasoline and Diesel Fuel Update (EIA)

(Million Cubic Feet) Data Series: Total Consumption Lease and Plant Fuel Consumption Pipeline & Distribution Use Volumes Delivered to Consumers Volumes Delivered to Residential...

218

ORNL Genome Analysis Pipeline - Eukaryotic  

NLE Websites -- All DOE Office Websites (Extended Search)

Grail (Microbial Gene Prediction System Internet Link) GrailEXP Genome Analysis Pipeline DomainParser PROSPECT (PROtein Structure Prediction and Evaluation Computer...

219

BENCHMARKING EMERGING PIPELINE INSPECTION TECHNOLOGIES  

NLE Websites -- All DOE Office Websites (Extended Search)

FINAL REPORT Benchmarking Emerging Pipeline Inspection Technologies To Department of Energy National Energy Technology Laboratory (NETL) DE-AP26-04NT40361 and Department of...

220

Leaking Pipelines: Doctoral Student Family Formation  

E-Print Network (OSTI)

Sari M. “Why the Academic Pipeline Leaks: Fewer Men thanone reason the academic pipeline leaks. 31 Blair-Loy, Mary.to leak out of the “academic pipeline. ” The term “academic

Serrano, Christyna M.

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Three dimensional scour along offshore pipelines.  

E-Print Network (OSTI)

??Three-dimensional scour propagation along offshore pipelines is a major reason to pipeline failures in an offshore environment. Although the research on scour in both numerical… (more)

Yeow, Kervin

2007-01-01T23:59:59.000Z

222

EIA - Natural Gas Pipeline System - Midwest Region  

U.S. Energy Information Administration (EIA)

Natural Gas Pipelines in the Midwest Region Overview | Domestic Gas | Canadian Imports | Regional Pipeline Companies & Links. Overview Twenty-six interstate and at ...

223

Gas Pipeline Securities (Indiana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pipeline Securities (Indiana) Gas Pipeline Securities (Indiana) Eligibility Utility Investor-Owned Utility Industrial MunicipalPublic Utility Rural Electric Cooperative Fuel...

224

Natural Gas Pipeline Projects Completed in 2003  

U.S. Energy Information Administration (EIA)

Table 2. Natural Gas Pipeline Projects Completed in 2003; Ending Region & State: Begins in State - Region: Pipeline/Project Name: FERC Docket ...

225

Gas Pipelines (Texas) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pipelines (Texas) Gas Pipelines (Texas) Eligibility Utility Fed. Government Commercial Investor-Owned Utility Industrial Construction MunicipalPublic Utility Local Government...

226

Pipeline Safety Rule (Tennessee) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sites Power Marketing Administration Other Agencies You are here Home Savings Pipeline Safety Rule (Tennessee) Pipeline Safety Rule (Tennessee) Eligibility Commercial...

227

NIST Building Facility for Hydrogen Pipeline Testing  

Science Conference Proceedings (OSTI)

... long-term exposure to hydrogen can embrittle existing pipelines, increasing the ... term service tests and apply them to study pipeline materials and ...

2012-10-02T23:59:59.000Z

228

Machinist Pipeline/Apprentice Program Program Description  

NLE Websites -- All DOE Office Websites (Extended Search)

Machinist PipelineApprentice Program Program Description The Machinist Pipeline Program was created by the Prototype Fabrication Division to fill a critical need for skilled...

229

Time-Constrained Loop Pipelining  

Science Conference Proceedings (OSTI)

This paper addresses the problem of Time-Constrained Loop Pipelining, i.e. given a fixed throughput, finding a schedule of a loop which minimizes resource requirements. This paper proposes a methodology, called TCLP, based on dividing the problem into ... Keywords: loop pipelining, scheduling, timing and resource contraints, register optimization

Fermin Sanchez

1995-12-01T23:59:59.000Z

230

NETL: Oil and Natural Gas Supply  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies Oil and Natural Gas Supply Water Treatment System Cleans Marcellus Shale Wastewater Additional Information Onsite operations and water quality testing of the...

231

Composites Technology for Hydrogen Pipelines  

NLE Websites -- All DOE Office Websites (Extended Search)

Composites Technology Composites Technology for Hydrogen Pipelines Barton Smith, Barbara Frame, Larry Anovitz and Cliff Eberle Oak Ridge National Laboratory Pipeline Working Group Meeting Pipeline Working Group Meeting Aiken, South Carolina Aiken, South Carolina September 25-26, 2007 September 25-26, 2007 Managed by UT-Battelle for the Department of Energy 2 Managed by UT Battelle for the Department of Energy Presentation name - _ Composites Technology for Hydrogen Pipelines Fiber-reinforced polymer pipe Project Overview: Investigate application of has excellent burst and collapse composite, fiber-reinforced polymer pipeline pressure ratings, large tensile technology for hydrogen transmission and and compression strengths, and distribution. superior chemical and corrosion resistance. Long lengths can be

232

Heat-pump desuperheaters for supplying domestic hot water - estimation of energy savings and economic viability for residential applications  

SciTech Connect

The heat reclaimer is a double-wall heat exchange system that removes superheat from the heat pump (or central air conditioning) cycle and uses it to heat water for domestic uses. During summer operation, this heat would normally be rejected to the atmosphere without being used. Thus, water heating is accomplished using essentially no primary fuel. In winter, the heat extracted from the cycle would have been used for space heating. However, energy savings are possible above the heat pump balance point because water heating is performed at an enhanced efficiency. Potential energy savings and economic viability of the heat reclaimer were determined for 28 sites throughout the United States. These results indicate that the heat reclaimer is not economically attractive compared with gas- or oil-fired water heating systems. However, it is competitive with electric resistance water heaters. Based on these results, a calculational scheme has been developed that could be integrated into the model audit procedure.

Olszewski, M.; Fontana, E.C.

1983-05-01T23:59:59.000Z

233

Ruby Pipeline ramps up rapidly to supply natural gas to ...  

U.S. Energy Information Administration (EIA)

A B C D E F G H I J K L M N O P Q R S T U V W XYZ. Today in Energy. ... PG&E's overall natural gas needs have changed little since late July when Ruby began flowing ...

234

Application of solar energy to the supply of hot water for textile dyeing. Final report, CDRL/PA 10  

DOE Green Energy (OSTI)

The design plan for a solar process hot water system for a textile dye beck at Riegel Textile Corporation's LaFrance, South Carolina, facilities is presented. The solar system consists of 396 GE model TC 100 evacuated tube collector modules arranged in a ground mounted array with a total collector area of 6680 square feet. The system includes an 8000-gallon hot water storage tank. Systems analyses, specification sheets, performance data, and an economic evaluation of the proposed system are presented. (WHK)

None

1977-09-01T23:59:59.000Z

235

Pipeline Safety Program he Oak Ridge National  

E-Print Network (OSTI)

miles of natural gas and hazardous liquid pipelines. To assist PHMSA accomplish this mission, ORNL Analysis Transportation Decision Support Systems Transportation Network Routing Models Natural gas pipeline operators in accordance with the following Federal pipeline safety regulations 49 CFR 192 - Gas Pipelines

236

EXTENSION WATER SUMMIT PRIORITY: WATER CONSERVATION  

E-Print Network (OSTI)

EXTENSION WATER SUMMIT PRIORITY: WATER CONSERVATION Leadership Team Subcommittee: Joan Bradshaw Michael Dukes Pierce Jones Kati Migliaccio #12;Water Conservation - Situation · Florida water supplies;Water Conservation Initiative 2: Enhancing and protecting water quality, quantity, and supply Priority 1

Slatton, Clint

237

Natural gas pipeline technology overview.  

Science Conference Proceedings (OSTI)

The United States relies on natural gas for one-quarter of its energy needs. In 2001 alone, the nation consumed 21.5 trillion cubic feet of natural gas. A large portion of natural gas pipeline capacity within the United States is directed from major production areas in Texas and Louisiana, Wyoming, and other states to markets in the western, eastern, and midwestern regions of the country. In the past 10 years, increasing levels of gas from Canada have also been brought into these markets (EIA 2007). The United States has several major natural gas production basins and an extensive natural gas pipeline network, with almost 95% of U.S. natural gas imports coming from Canada. At present, the gas pipeline infrastructure is more developed between Canada and the United States than between Mexico and the United States. Gas flows from Canada to the United States through several major pipelines feeding U.S. markets in the Midwest, Northeast, Pacific Northwest, and California. Some key examples are the Alliance Pipeline, the Northern Border Pipeline, the Maritimes & Northeast Pipeline, the TransCanada Pipeline System, and Westcoast Energy pipelines. Major connections join Texas and northeastern Mexico, with additional connections to Arizona and between California and Baja California, Mexico (INGAA 2007). Of the natural gas consumed in the United States, 85% is produced domestically. Figure 1.1-1 shows the complex North American natural gas network. The pipeline transmission system--the 'interstate highway' for natural gas--consists of 180,000 miles of high-strength steel pipe varying in diameter, normally between 30 and 36 inches in diameter. The primary function of the transmission pipeline company is to move huge amounts of natural gas thousands of miles from producing regions to local natural gas utility delivery points. These delivery points, called 'city gate stations', are usually owned by distribution companies, although some are owned by transmission companies. Compressor stations at required distances boost the pressure that is lost through friction as the gas moves through the steel pipes (EPA 2000). The natural gas system is generally described in terms of production, processing and purification, transmission and storage, and distribution (NaturalGas.org 2004b). Figure 1.1-2 shows a schematic of the system through transmission. This report focuses on the transmission pipeline, compressor stations, and city gates.

Folga, S. M.; Decision and Information Sciences

2007-11-01T23:59:59.000Z

238

Energy and Security in Northeast Asia: Supply and Demand, Conflict and  

E-Print Network (OSTI)

Republic pipeline grid Source: “Oil and Gas in the Russianin stabilizing Middle East oil supply sources and shippingChina’s Oil Exports and Imports, 1980-1995 Source: East-West

Fesharaki, Fereidun; Banaszak, Sarah; WU, Kang; Valencia, Mark J.; Dorian, James P.

1998-01-01T23:59:59.000Z

239

DOE Hydrogen Pipeline Working Group Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

Pipeline Pipeline Working Group Workshop August 31, 2005 Augusta, Georgia Hydrogen Pipeline Experience Presented By: LeRoy H. Remp Lead Project Manager Pipeline Projects ppt00 3 Hydrogen Pipeline - Scope of Presentation Only those systems that are regulated by DOT in the US, DOT delegated state agency, or other federal regulatory authority. Cross property of third party and/or public properties for delivery to customers. Does not include in-plant or in-house hydrogen piping. Does not include piping (aboveground or underground) that delivers to a customer if all property is owned and controlled by Air Products and the customer. ppt00 4 Pipeline Photos ppt00 5 Pipeline Photos ppt00 6 Pipeline Photos ppt00 7 Pipeline Photos ppt00 8 Pipeline Photos ppt00 9 Overview of North American

240

Oil and Gas Supply Module  

Gasoline and Diesel Fuel Update (EIA)

States, acquire natural gas from foreign producers for resale States, acquire natural gas from foreign producers for resale in the United States, or sell U.S. gas to foreign consumers. OGSM encompasses domestic crude oil and natural gas supply by both conventional and nonconventional recovery techniques. Nonconventional recovery includes unconventional gas recovery from low permeability formations of sandstone and shale, and coalbeds. Foreign gas transactions may occur via either pipeline (Canada or Mexico) or transport ships as liquefied natural gas (LNG). Energy Information Administration/Assumptions to the Annual Energy Outlook 2006 89 Figure 7. Oil and Gas Supply Model Regions Source: Energy Information Administration, Office of Integrated Analysis and Forecasting. Report #:DOE/EIA-0554(2006) Release date: March 2006

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

About U.S. Natural Gas Pipelines  

Reports and Publications (EIA)

This information product provides the interested reader with a broad and non-technical overview of how the U.S. natural gas pipeline network operates, along with some insights into the many individual pipeline systems that make up the network. While the focus of the presentation is the transportation of natural gas over the interstate and intrastate pipeline systems, information on subjects related to pipeline development, such as system design and pipeline expansion, are also included.

Information Center

2007-06-01T23:59:59.000Z

242

Pipeline expansion to aid East, Midwest  

SciTech Connect

Texas Eastern Transmission Corp.'s expanded capacity of 25,000 barrels per day will benefit Midwestern and Eastern industries and utilities by adding a parallel pipeline to a storage terminal in Arkansas. Confidence in the market potential of liquid petroleum gas (LPG) is reflected in this move and in predictions that increased imports of LPG will reach 655,000 barrels per day in 1980 compared to 34,000 in 1976. Industries are expected to use butane interchangeably with propane in the future. Regulations governing the future of the LPG market require competitive pricing, long-term supply and shipping agreements, and the use of foreign LPG as a feedstock for synthetic natural gas if LPG use is to continue expanding. (DCK)

Crawford, E.

1977-06-06T23:59:59.000Z

243

Magnetic Resonance Connectome Automated Pipeline  

E-Print Network (OSTI)

This manuscript presents a novel, tightly integrated pipeline for estimating a connectome, which is a comprehensive description of the neural circuits in the brain. The pipeline utilizes magnetic resonance imaging (MRI) data to produce a high-level estimate of the structural connectivity in the human brain. The Magnetic Resonance Connectome Automated Pipeline (MRCAP) is efficient and its modular construction allows researchers to modify algorithms to meet their specific requirements. The pipeline has been validated and over 200 connectomes have been processed and analyzed to date. This tool enables the prediction and assessment of various cognitive covariates, and this research is applicable to a variety of domains and applications. MRCAP will enable MR connectomes to be rapidly generated to ultimately help spur discoveries about the structure and function of the human brain.

Gray, William R; Vogelstein, Joshua T; Landman, Bennett A; Prince, Jerry L; Vogelstein, R Jacob

2011-01-01T23:59:59.000Z

244

Gas Utility Pipeline Tax (Texas)  

Energy.gov (U.S. Department of Energy (DOE))

All gas utilities, including any entity that owns, manages, operates, leases, or controls a pipeline for the purpose of transporting natural gas in the state for sale or compensation, as well as...

245

Common Pipeline Carriers (North Dakota)  

Energy.gov (U.S. Department of Energy (DOE))

Any entity that owns, operates, or manages a pipeline for the purpose of transporting crude petroleum, gas, coal, or carbon dioxide within or through the state of North Dakota, or is engaged in the...

246

New Materials for Hydrogen Pipelines  

NLE Websites -- All DOE Office Websites (Extended Search)

Barbara Frame, Mike Simonson, Cliff Eberle, Jim Blencoe, and Tim Armstrong Hydrogen Pipeline R&D Project Review Meeting January 5-6, 2005 Oak Ridge National Laboratory 2 OAK...

247

Interstate Natural Gas Pipelines (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

This statute confers upon the Utilities Board the authority to act as an agent of the federal government in determining pipeline company compliance with federal standards within the boundaries of...

248

PIPELINES AS COMMUNICATION NETWORK LINKS  

SciTech Connect

This report presents the results of an investigation into two methods of using the natural gas pipeline as a communication medium. The work addressed the need to develop secure system monitoring and control techniques between the field and control centers and to robotic devices in the pipeline. In the first method, the pipeline was treated as a microwave waveguide. In the second method, the pipe was treated as a leaky feeder or a multi-ground neutral and the signal was directly injected onto the metal pipe. These methods were tested on existing pipeline loops at UMR and Batelle. The results reported in this report indicate the feasibility of both methods. In addition, a few suitable communication link protocols for this network were analyzed.

Kelvin T. Erickson; Ann Miller; E. Keith Stanek; C.H. Wu; Shari Dunn-Norman

2005-03-14T23:59:59.000Z

249

Pipeline Processing of VLBI Data  

E-Print Network (OSTI)

As part of an on-going effort to simplify the data analysis path for VLBI experiments, a pipeline procedure has been developed at JIVE to carry out much of the data reduction required for EVN experiments in an automated fashion. This pipeline procedure runs entirely within AIPS, the standard data reduction package used in astronomical VLBI, and is used to provide preliminary calibration of EVN experiments correlated at the EVN MkIV data processor. As well as simplifying the analysis for EVN users, the pipeline reduces the delay in providing information on the data quality to participating telescopes, hence improving the overall performance of the array. A description of this pipeline is presented here.

C. Reynolds; Z. Paragi; M. Garrett

2002-05-08T23:59:59.000Z

250

Decoupled Sampling for Graphics Pipelines  

E-Print Network (OSTI)

We propose a generalized approach to decoupling shading from visibility sampling in graphics pipelines, which we call decoupled sampling. Decoupled sampling enables stochastic supersampling of motion and defocus blur at ...

Ragan-Kelley, Jonathan Millar

251

Using Natural Gas Transmission Pipeline Costs to Estimate Hydrogen Pipeline Costs  

E-Print Network (OSTI)

Warren R. “U.S. interstate pipelines begin 1993 on upbeat. ”66. ? True, Warren R. “Current pipeline costs. ” Oil & GasWarren R. “U.S. interstate pipelines ran more efficiently in

Parker, Nathan

2004-01-01T23:59:59.000Z

252

Power supply  

DOE Patents (OSTI)

A modular, low weight impedance dropping power supply with battery backup is disclosed that can be connected to a high voltage AC source and provide electrical power at a lower voltage. The design can be scaled over a wide range of input voltages and over a wide range of output voltages and delivered power.

Yakymyshyn, Christopher Paul (Seminole, FL); Hamilton, Pamela Jane (Seminole, FL); Brubaker, Michael Allen (Loveland, CO)

2007-12-04T23:59:59.000Z

253

The pipeline and future of drug development in schizophrenia  

E-Print Network (OSTI)

The Pipeline and Future of Drug Development in SchizophreniaThe Drug Discovery Pipeline in Schizophrenia Keywords:discuss the current pipeline of drugs for schizophrenia,

Gray, J A; Roth, B L

2007-01-01T23:59:59.000Z

254

Columbia River System Operation Review : Final Environmental Impact Statement, Appendix F: Irrigation, Municipal and Industrial/Water Supply.  

DOE Green Energy (OSTI)

Since the 1930`s, the Columbia River has been harnessed for the benefit of the Northwest and the nation. Federal agencies have built 30 major dams on the river and its tributaries. Dozens of non-Federal projects have been developed as well. The dams provide flood control, irrigation, navigation, hydro-electric power generation, recreation, fish and wildlife, and streamflows for wildlife, anadromous fish, resident fish, and water quality. This is Appendix F of the Environmental Impact Statement for the Columbia River System, focusing on irrigation issues and concerns arrising from the Irrigation and Mitigation of impacts (M&I) working Group of the SOR process. Major subheadings include the following: Scope and process of irrigation/M&I studies; Irrigation/M&I in the Columbia Basin Today including overview, irrigated acreage and water rights, Irrigation and M&I issues basin-wide and at specific locations; and the analysis of impacts and alternative for the Environmental Impact Statement.

Columbia River System Operations Review (U.S.); United States. Bonneville Power Administration; United States. Army. Corps of Engineers. North Pacific Division; United States. Bureau of Reclamation. Pacific Northwest Region.

1995-11-01T23:59:59.000Z

255

Power supply  

SciTech Connect

An electric power supply employs a striking means to initiate ferroelectric elements which provide electrical energy output which subsequently initiates an explosive charge which initiates a second ferroelectric current generator to deliver current to the coil of a magnetic field current generator, creating a magnetic field around the coil. Continued detonation effects compression of the magnetic field and subsequent generation and delivery of a large output current to appropriate output loads.

Hart, Edward J. (Albuquerque, NM); Leeman, James E. (Albuquerque, NM); MacDougall, Hugh R. (Albuquerque, NM); Marron, John J. (Albuquerque, NM); Smith, Calvin C. (Amarillo, TX)

1976-01-01T23:59:59.000Z

256

Petroleum storage and transportation capacities. Volume III. Petroleum pipeline  

SciTech Connect

Capacity data as of December 31, 1978, are presented for common carrier crude lines, refined petroleum product lines, and liquified petroleum gas/natural gas liquids (LPG/NGL) lines in the form of maps and tables. The maps include: a United States map, including all lines, for crude lines, petroleum product lines, and LPG/NGL lines, each separately; and Petroleum Administration for Defense (PAD) maps for crude and petroleum product lines, each separately. Tables presenting more detailed information than contained on the maps and intended to be used as a supplement to them are included in the Appendices. Several significant trends have developed in the years since the 1967 report was published. The United States has imported increasing amounts of foreign crude oil to supplement its declining domestic production. This foreign crude oil is imported through water terminals and their associated facilities and distributed through petroleum pipelines to inland refineries. Major amounts of imported crude oil are transported by pipeline from the Gulf Coast to the Central and upper Midwest refineries. The trend at the present time is to mix these individual crude oils having similar qualities and deliver the mixes to the refineries. Also, it has become common to batch various combinations of crude oil, refined product, LPG, and petrochemicals through a single pipeline. This ability to ship various petroleum materials in a single pipeline has enhanced the flexibility of the pipeline network.

1979-01-01T23:59:59.000Z

257

EIA - Natural Gas Pipeline System - Northeast Region  

U.S. Energy Information Administration (EIA) Indexed Site

Northeast Region Northeast Region About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Pipelines in the Northeast Region Overview | Domestic Gas | Canadian Imports | Regional Pipeline Companies & Links Overview Twenty interstate natural gas pipeline systems operate within the Northeast Region (Connecticut, Delaware, Massachusetts, Maine, New Hampshire, New Jersey, New York, Pennsylvania, Rhode Island, Virginia, and West Virginia). These interstate pipelines deliver natural gas to several intrastate natural gas pipelines and at least 50 local distribution companies in the region. In addition, they also serve large industrial concerns and, increasingly, natural gas fired electric power generation facilities.

258

Pipeline Safety (Pennsylvania) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pipeline Safety (Pennsylvania) Pipeline Safety (Pennsylvania) Pipeline Safety (Pennsylvania) < Back Eligibility Utility Investor-Owned Utility Industrial Municipal/Public Utility Rural Electric Cooperative Program Info State Pennsylvania Program Type Safety and Operational Guidelines Provider Pennsylvania Public Utilities Commission The Pennsylvania legislature has empowered the Public Utility Commission to direct and enforce safety standards for pipeline facilities and to regulate safety practices of certificated utilities engaged in the transportation of natural gas and other gas by pipeline. The Commission is authorized to enforce federal safety standards as an agent for the U.S. Department of Transportation's Office of Pipeline Safety. The safety standards apply to the design, installation, operation,

259

Development of Protective Coatings for Co-Sequestration Processes and Pipelines  

SciTech Connect

The program, entitled â??Development of Protective Coatings for Co-Sequestration Processes and Pipelinesâ?ť, examined the sensitivity of existing coating systems to supercritical carbon dioxide (SCCO2) exposure and developed new coating system to protect pipelines from their corrosion under SCCO2 exposure. A literature review was also conducted regarding pipeline corrosion sensors to monitor pipes used in handling co-sequestration fluids. Research was to ensure safety and reliability for a pipeline involving transport of SCCO2 from the power plant to the sequestration site to mitigate the greenhouse gas effect. Results showed that one commercial coating and one designed formulation can both be supplied as potential candidates for internal pipeline coating to transport SCCO2.

Gordon Bierwagen; Yaping Huang

2011-11-30T23:59:59.000Z

260

A probe for in situ, remote, detection of defects in buried plastic natural gas pipelines  

Science Conference Proceedings (OSTI)

Several techniques are available to determine the integrity of in situ metal pipeline but very little is available in the literature to determine the integrity of plastic pipelines. Since the decade of the 1970s much of the newly installed gas distribution and transmission lines in the United States are fabricated from polyethylene or other plastic. A probe has been developed to determine the in situ integrity of plastic natural gas pipelines that can be installed on a traversing mechanism (pig) to detect abnormalities in the walls of the plastic natural gas pipeline from the interior. This probe has its own internal power source and can be deployed into existing natural gas supply lines. Utilizing the capacitance parameter, the probe inspects the pipe for flaws and records the data internally which can be retrieved later for analysis.

Mathur, M.P.; Spenik, J.L.; Condon, C.M.; Monazam, E.R.; Fincham, W.L.

2007-12-18T23:59:59.000Z

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Development of colorimetric solid Phase Extraction (C-SPE) for in-flight Monitoring of spacecraft Water Supplies  

SciTech Connect

Although having recently been extremely successful gathering data on the surface of Mars, robotic missions are not an effective substitute for the insight and knowledge about our solar system that can be gained though first-hand exploration. Earlier this year, President Bush presented a ''new course'' for the U.S. space program that shifts NASA's focus to the development of new manned space vehicles to the return of humans to the moon. Re-establishing the human presence on the moon will eventually lead to humans permanently living and working in space and also serve as a possible launch point for missions into deeper space. There are several obstacles to the realization of these goals, most notably the lack of life support and environmental regeneration and monitoring hardware capable of functioning on long duration spaceflight. In the case of the latter, past experience on the International Space Station (ISS), Mir, and the Space Shuttle has strongly underscored the need to develop broad spectrum in-flight chemical sensors that: (1) meet current environmental monitoring requirements on ISS as well as projected requirements for future missions, and (2) enable the in-situ acquisition and analysis of analytical data in order to further define on-orbit monitoring requirements. Additionally, systems must be designed to account for factors unique to on-orbit deployment such as crew time availability, payload restrictions, material consumption, and effective operation in microgravity. This dissertation focuses on the development, ground testing, and microgravity flight demonstration of Colorimetric Solid Phase Extraction (C-SPE) as a candidate technology to meet the near- and long-term water quality monitoring needs of NASA. The introduction will elaborate further on the operational and design requirements for on-orbit water quality monitoring systems by discussing some of the characteristics of an ''ideal'' system. A description of C-SPE and how the individual components of the platform are combined to satisfy many of these requirements is then presented, along with a literature review on the applications of C-SPE and similar sorption-spectrophotometric techniques. Finally, a brief overview of diffuse reflection spectroscopy and the Kubelka-Munk function, which are used to quantify analytes via C-SPE, is presented.

Daniel Bryan Gazda

2004-12-19T23:59:59.000Z

262

TASSEL: MLM/GLM Pipeline: Guide to using Tassel Pipeline Terry Casstevens (tmc46@cornell.edu), Zhiwu Zhang, Peter Bradbury, and Edward  

E-Print Network (OSTI)

1 TASSEL: MLM/GLM Pipeline: Guide to using Tassel Pipeline Terry Casstevens (tmc46@cornell..............................................................................................................................................................2 Appendix A: MLM Pipeline Diagrams..........................................................................................................3 Appendix B: GLM Pipeline Diagrams

Buckler, Edward S.

263

Water Data Report: An Annotated Bibliography  

E-Print Network (OSTI)

Table 5: Public supply water withdrawals, 2000. water withdrawals, 2000. water withdrawals, 2000.

Dunham Whitehead, Camilla; Melody, Moya

2007-01-01T23:59:59.000Z

264

Energy Basics: Microhydropower Water Conveyance and Filters  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

These components include the headrace, forebay, and water conveyance (or channel, pipeline, or penstock). The headrace is a waterway that runs parallel to the water source. A...

265

Application Filing Requirements for Natural Gas Pipeline Construction...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application Filing Requirements for Natural Gas Pipeline Construction Projects (Wisconsin) Application Filing Requirements for Natural Gas Pipeline Construction Projects...

266

EIA - Natural Gas Imports & Exports/Pipelines Data & Analysis  

Gasoline and Diesel Fuel Update (EIA)

Imports & Exports / Pipelines Imports & Exports / Pipelines U.S. Imports by Country Prices and volumes (monthly, annual). U.S. Exports by Country Prices and volumes (monthly, annual). U.S. Imports & Exports by State Prices and volumes (annual). U.S. Imports by Point of Entry Prices and volumes (annual). U.S. Exports by Point of Exit Prices and volumes (annual). International & Interstate Movements of Natural Gas Includes International and Interstate receipts, deliveries and net reciepts by State (annual). Natural Gas Weekly Update Analysis of current price, supply, and storage data; and a weather snapshot. Natural Gas Monthly U.S. production, supply, consumption, disposition, storage, imports, exports, and prices. Natural Gas Basics Analysis of Natural Gas Imports/Exports & Pipelines

267

A Negative-Overhead, Self-Timed Pipeline  

E-Print Network (OSTI)

This' paper presents' a novel variation of wave pipelining that we call "surfing." In previous wave pipelined designs, timing uncertainty grows' monotonically as events' propagate through gates or other logic elements'. We bound this dispersion by propagating a timing pulse along with the data values. Our logic elements have delays' that are smaller in the presence of the pulse than in its' absence. This' produces a "surfing " effect: events' are bound in close proximity to the timing pulse. We demonstrate this approach with the design of a 4x12 multiplier. Spice simulations from the extracted layout indicate that this design is robust in the presence of fabrication parameter variation and power supply noise. Because timing is' maintained by accelerating the logic, our designs achieve lower latency than their purely combinational equivalents'. Thus, the control overhead for these designs is' indeed negative.

Brian D. Winters; Mark R. Greenstreet

2002-01-01T23:59:59.000Z

268

Co-scheduling hardware and software pipelines  

E-Print Network (OSTI)

In this paper we propose CO-Scheduling, a framework for simultaneous design of hardware pipelines struc-tures and software-pipelined schedules. Two important components of the Co-Scheduling framework are: (1) An extension to the analysis of hardware pipeline design that meets the needs of periodic (or software pipelined) schedules. Reservation tables, forbidden la-tencies, collision vectors, and state diagrams from classical pipeline theory are revisited and extended to solve the new problems. (2) An efficient method, based on the above extension of pipeline analysis, to perform (a) software pipeline scheduling and (b) hardware pipeline reconfiguration which are mutually “compatible ”. The proposed method has been implemented and pre-liminary experimental results for 1008 kernel loops are reported. Co-scheduling successfully obtains a sched-ule for 95 % of these loops. The median time to obtain these schedules is 0.25 seconds on a Sparc-20. Keywords:

R. Govindarajan; Erik R. Altman; Guang R. Gao

1996-01-01T23:59:59.000Z

269

Maurer computers for pipelined instruction processing†  

Science Conference Proceedings (OSTI)

We model micro-architectures with non-pipelined instruction processing and pipelined instruction processing using Maurer machines, basic thread algebra and program algebra. We show that stored programs are executed as intended with these micro-architectures. ...

J. a. Bergstra; C. a. Middelburg

2008-04-01T23:59:59.000Z

270

Method and system for pipeline communication  

DOE Patents (OSTI)

A pipeline communication system and method includes a pipeline having a surface extending along at least a portion of the length of the pipeline. A conductive bus is formed to and extends along a portion of the surface of the pipeline. The conductive bus includes a first conductive trace and a second conductive trace with the first and second conductive traces being adapted to conformally couple with a pipeline at the surface extending along at least a portion of the length of the pipeline. A transmitter for sending information along the conductive bus on the pipeline is coupled thereto and a receiver for receiving the information from the conductive bus on the pipeline is also couple to the conductive bus.

Richardson; John G. (Idaho Falls, ID)

2008-01-29T23:59:59.000Z

271

California Interstate Natural Gas Pipeline Capacity Levels ...  

U.S. Energy Information Administration (EIA)

PG&E Gas Transmission - NW Tuscarora Pipeline (Malin OR) 110 Mmcf/d 2,080 Mmcf/d Total Interstate Pipeline Capacity into California 7,435 Mmcf/d Net Natural Gas ...

272

Pipeline Rupture: Review of Common Metallurgical Failure ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, Materials Science & Technology 2012. Symposium, Failure Analysis and Prevention. Presentation Title, Pipeline Rupture: Review ...

273

EIA - Natural Gas Pipeline Network - Depleted Reservoir ...  

U.S. Energy Information Administration (EIA)

About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates

274

Department of Transportation Pipeline and Hazardous Materials...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administration Other Agencies You are here Home Department of Transportation Pipeline and Hazardous Materials Safety Administration Activities Department of Transportation...

275

Computer Science and Information Technology Student Pipeline  

NLE Websites -- All DOE Office Websites (Extended Search)

Student Pipeline Program Description Los Alamos National Laboratory's High Performance Computing and Information Technology Divisions recruit and hire promising...

276

Regional Profiles: Pipeline Capacity and Service  

U.S. Energy Information Administration (EIA)

Regional Profiles: Pipeline Capacity ... large petrochemical and electric utility industries drawn there ... accounts for large electricity load ...

277

Microsoft Word - WIPP Water Line _2_ _2_ _2_  

NLE Websites -- All DOE Office Websites (Extended Search)

Announces the Transfer of the WIPP Water Line to Announces the Transfer of the WIPP Water Line to the City of Carlsbad CARLSBAD, N.M., June 18, 2009-The U.S. Department of Energy announced today that the Carlsbad Field Office will transfer the DOE-owned Waste Isolation Pilot Plant (WIPP) water line to the city of Carlsbad. The move will provide the city with an additional water supply while saving the Department of Energy thousands of dollars. DOE first installed the water line in 1984 to support the ongoing operations of the Department's disposal facility. It now transports water from the city-owned Double Eagle Water System wells to the plant. Under the finalized bill of sale, the city will take over complete responsibility for maintaining and repairing the pipeline in exchange for the water line. The city of Carlsbad also

278

Liquefaction and Pipeline Costs Bruce Kelly  

E-Print Network (OSTI)

1 Liquefaction and Pipeline Costs Bruce Kelly Nexant, Inc. Hydrogen Delivery Analysis Meeting May 8 total installed cost #12;6 Distribution Pipeline Costs Collected historical Oil & Gas Journal data, and surveyed for current urban and downtown data Verified that historical natural gas pipeline cost data

279

Pipeline Safety Program Oak Ridge National Laboratory  

E-Print Network (OSTI)

Pipeline Safety Program Oak Ridge National Laboratory managed by UT-Battelle, LLC for the U support to the U.S. Department of Transportation's Pipeline and Hazardous Materials Safety Administration (PHMSA). As a federal regulatory authority with jurisdiction over pipeline safety, PHMSA is responsible

280

Tassel Pipeline Tutorial (Command Line Interface)  

E-Print Network (OSTI)

Tassel Pipeline Tutorial (Command Line Interface) Terry Casstevens Institute for Genomic Diversity, Cornell University May 11, 2011 #12;Tassel Pipeline Basics... · Consists of Modules (i.e. Plugins) · Output from one Module can be Input to another Module. Determined by order specified. run_pipeline

Buckler, Edward S.

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

California Energy Commission Pipeline Integrity Technology  

E-Print Network (OSTI)

California Energy Commission Pipeline Integrity Technology Demonstration Grant California Energy Solicitation Scope · The purpose of this solicitation is to demonstrate natural gas pipeline inspection using low cost/low power sensors ­ Improvement of existing pipeline inspection technology to identify

282

Water and Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Water in swimming pool Water and Energy The water and energy technology research focuses on improving the efficiency of energy and water use in water delivery, supply and...

283

HYDROGEN PIPELINE COMPONENTS  

NLE Websites -- All DOE Office Websites (Extended Search)

power generation, about one-half for agriculture, and the remainder for domestic use (McKinsey & Company 2009). (For comparison, total water withdrawals in the United States in...

284

IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers  

E-Print Network (OSTI)

2010. ) AWWA. 2006. Water Conservation Programs—A PlanningWater Conservation..staff (Caffal, 1995). Water Conservation Beyond optimizing

Brown, Moya Melody, Camilla Dunham Whitehead, Rich

2011-01-01T23:59:59.000Z

285

The economic conception of water  

E-Print Network (OSTI)

American City: municipal water supply investments. Ph. D.A . (2004). Boosting Water Productivity. In: Worldwatch1975). Issues in Village Water Supply. Washington, D . C ,

Hanemann, W. Michael

2005-01-01T23:59:59.000Z

286

Intrastate Pipeline Safety (Minnesota) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Intrastate Pipeline Safety (Minnesota) Intrastate Pipeline Safety (Minnesota) Intrastate Pipeline Safety (Minnesota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State Minnesota Program Type Siting and Permitting These regulations provide standards for gas and liquid pipeline maintenance and operating procedures, per the Federal Hazardous Liquid and Natural Gas Pipeline Safety Acts, and give the commissioner of public safety the

287

Scenario: Supplying Our Water Needs  

NLE Websites -- All DOE Office Websites (Extended Search)

Thornridge High School is using an approach to science that integrates Thornridge High School is using an approach to science that integrates learning strategies, math, social studies, and science. Dennis Condon, Gary Fryrear, Bill Meder, and Shelly Peretz share the same 40 students for two 50-minute class periods. This gives the teachers the flexibility to meet with one group of students (20), one class period (50 minutes) every day or two class periods (100 minutes) every other day, within the confines of the traditional school schedule. Each classroom has three ethernet ports which allow teachers to move computers around on the same network. In addition, the network is connected to a router and an ISDN phone line, so the network is connected to the Internet at relatively high speeds. Each classroom also has a telephone.

288

Scenario: Supplying Our Water Needs  

NLE Websites -- All DOE Office Websites (Extended Search)

Illinois. Handbook of Engaged Learning Projects sponsored by Fermi National Accelerator Laboratory Education Office and Friends of Fermilab. Funded by the Midwest Consortium for...

289

Scenario: Supplying Our Water Needs  

NLE Websites -- All DOE Office Websites (Extended Search)

Illinois Handbook of Engaged Learning Projects sponsored by Fermi National Accelerator Laboratory Education Office and Friends of Fermilab. Funded by the Midwest Consortium for...

290

Clean Development Mechanism Pipeline | Open Energy Information  

Open Energy Info (EERE)

Clean Development Mechanism Pipeline Clean Development Mechanism Pipeline Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Clean Development Mechanism Pipeline Agency/Company /Organization: UNEP-Risoe Centre, United Nations Environment Programme Sector: Energy, Land Topics: Finance, Implementation, Background analysis Resource Type: Dataset Website: www.cdmpipeline.org/overview.htm Clean Development Mechanism Pipeline Screenshot References: CDM Pipeline[1] Overview "The CDM/JI Pipeline Analysis and Database contains all CDM/JI projects that have been sent for validation/determination. It also contains the baseline & monitoring methodologies, a list of DOEs and several analyses. This monthly newsletter shows a sample of the analysis in the Pipeline. If you want more information, then look into the left column and click on the

291

Why Supply Chain  

E-Print Network (OSTI)

Why supply chain explains the importance of supply chains. It includes an introduction to ERP as designed by SAP.

Datta, Shoumen

2000-01-01T23:59:59.000Z

292

EIA - Natural Gas Pipeline System - Links to U.S. Natural Gas Pipeline  

U.S. Energy Information Administration (EIA) Indexed Site

Links Links About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Links to U.S. Natural Gas Pipeline Information - The links below will either direct the user to a narrative describing the system, a pipeline system map, a FERC prescribed "Informational Postings" page, or a FERC Tariff Sheet. Pipeline Name Type of System Regions of Operations Acadian Gas Pipeline System Intrastate Southwest Algonquin Gas Transmission Co Interstate Northeast Alliance Pipeline Co Interstate Central, Midwest Anaconda Pipeline System Gathering Gulf of Mexico ANR Pipeline Co Interstate Midwest ANR Storage Co Interstate Midwest Arkansas Oklahoma Gas Co Intrastate Southwest Arkansas Western Pipeline Co Intrastate

293

Application of solar energy to the supply of industrial process hot water: preliminary design and performance report. Volume I. Technical report. Aerotherm report TR-76-219. [For can washing at Campbell Soup Plant in Sacramento  

DOE Green Energy (OSTI)

The design and performance of a solar hot water system for can washing at the Campbell Soup Plant in Sacramento, California, are presented. The collector field is located on the roof of the finished products warehouse of the Campbell Soup Sacramento plant. Water is supplied from a 3.8 cm (1/sup 1///sub 2/ in.) supply line which is located directly below an existing roof access hatch. A supply pipe will be brought up through that hatch. The water flow will then be split into two manifold lines which supply the dual rows of flat plate collectors. The preheated water from the flat plates is then passed into six sets of parallel connected concentrators. Each set consist of eight 1.83 x 3.05 m (6 x 10 foot) modules connected in series. The water from these units is gathered in a 3.8 cm (1/sup 1///sub 2/ in.) insulated pipe which transports it to the storage tank. This pipe will be attached to an existing pipe run until it reaches the can washing building. From there the pipe will follow the can washing building around to the storage tank. The storage tank is a 75,200 1 (20,000 gal) steel tank which is coated internally with a USDA approved phenolic liner. The outside of the tank is insulated. A 2.2 kw (3 hp) motor is used to pump the stored water for the tank into the can washing line. Detail drawings and descriptions of the collector field, installation, piping, controls, data acquisition equipment, and roof structure are included. Furthermore, a program schedule with equipment and manpower costs for successfully completing Phase II of this contract is included. Also included is an organization chart of the Phase II program personnel. (WHK)

None

1976-10-14T23:59:59.000Z

294

Seismic fragility formulations for segmented buried pipeline systems including the impact of differential ground subsidence  

Science Conference Proceedings (OSTI)

Though Differential Ground Subsidence (DGS) impacts the seismic response of segmented buried pipelines augmenting their vulnerability, fragility formulations to estimate repair rates under such condition are not available in the literature. Physical models to estimate pipeline seismic damage considering other cases of permanent ground subsidence (e.g. faulting, tectonic uplift, liquefaction, and landslides) have been extensively reported, not being the case of DGS. The refinement of the study of two important phenomena in Mexico City - the 1985 Michoacan earthquake scenario and the sinking of the city due to ground subsidence - has contributed to the analysis of the interrelation of pipeline damage, ground motion intensity, and DGS; from the analysis of the 48-inch pipeline network of the Mexico City's Water System, fragility formulations for segmented buried pipeline systems for two DGS levels are proposed. The novel parameter PGV{sup 2}/PGA, being PGV peak ground velocity and PGA peak ground acceleration, has been used as seismic parameter in these formulations, since it has shown better correlation to pipeline damage than PGV alone according to previous studies. By comparing the proposed fragilities, it is concluded that a change in the DGS level (from Low-Medium to High) could increase the pipeline repair rates (number of repairs per kilometer) by factors ranging from 1.3 to 2.0; being the higher the seismic intensity the lower the factor.

Pineda Porras, Omar Andrey [Los Alamos National Laboratory; Ordaz, Mario [UNAM, MEXICO CITY

2009-01-01T23:59:59.000Z

295

Capsule injection system for a hydraulic capsule pipelining system  

DOE Patents (OSTI)

An injection system for injecting capsules into a hydraulic capsule pipelining system, the pipelining system comprising a pipeline adapted for flow of a carrier liquid therethrough, and capsules adapted to be transported through the pipeline by the carrier liquid flowing through the pipeline. The injection system comprises a reservoir of carrier liquid, the pipeline extending within the reservoir and extending downstream out of the reservoir, and a magazine in the reservoir for holding capsules in a series, one above another, for injection into the pipeline in the reservoir. The magazine has a lower end in communication with the pipeline in the reservoir for delivery of capsules from the magazine into the pipeline.

Liu, Henry (Columbia, MO)

1982-01-01T23:59:59.000Z

296

Workforce Pipeline | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Diversity Diversity Message from the Lab Director Diversity & Inclusion Advisory Council Workforce Pipeline Mentoring Leadership Development Policies & Practices Business Diversity Outreach & Education In the News High school workshop invites girls to explore STEM possibilities Daily Herald EcoCAR 2 competition drives auto engineers to excel Yuma (Ariz.) Sun Mississippi universities collaborate with national labs Mississippi Public Radio Workforce Pipeline Argonne seeks to attract, hire and retain a diverse set of talent in order to meet the laboratory's mission of excellence in science, engineering and technology. In order for Argonne to continue to carry out world-class science, the lab needs to seek out the best talent. Today, that talent is increasingly diverse. Argonne fosters an environment that welcomes and values a diverse

297

BENCHMARKING EMERGING PIPELINE INSPECTION TECHNOLOGIES  

NLE Websites -- All DOE Office Websites (Extended Search)

Benchmarking Emerging Pipeline Inspection Technologies To Department of Energy National Energy Technology Laboratory (NETL) DE-AP26-04NT40361 and Department of Transportation Research and Special Programs Administration (RSPA) DTRS56-02-T-0002 (Milestone 7) September 2004 Final Report on Benchmarking Emerging Pipeline Inspection Technologies Cofunded by Department of Energy National Energy Technology Laboratory (NETL) DE-AP26-04NT40361 and Department of Transportation Research and Special Programs Administration (RSPA) DTRS56-02-T-0002 (Milestone 7) by Stephanie A. Flamberg and Robert C. Gertler September 2004 BATTELLE 505 King Avenue Columbus, Ohio 43201-2693 Neither Battelle, nor any person acting on their behalf: (1) Makes any warranty or representation, expressed or implied, with respect to the

298

Analytic prognostic for petrochemical pipelines  

E-Print Network (OSTI)

Pipelines tubes are part of vital mechanical systems largely used in petrochemical industries. They serve to transport natural gases or liquids. They are cylindrical tubes and are submitted to the risks of corrosion due to high PH concentrations of the transported liquids in addition to fatigue cracks due to the alternation of pressure-depression of gas along the time, initiating therefore in the tubes body micro-cracks that can propagate abruptly to lead to failure. The development of the prognostic process for such systems increases largely their performance and their availability, as well decreases the global cost of their missions. Therefore, this paper deals with a new prognostic approach to improve the performance of these pipelines. Only the first mode of crack, that is, the opening mode, is considered.

Abdo Abou Jaoude; Seifedine Kadry; Khaled El-Tawil; Hassan Noura; Mustapha Ouladsine

2012-12-25T23:59:59.000Z

299

Analytic prognostic for petrochemical pipelines  

E-Print Network (OSTI)

Pipelines tubes are part of vital mechanical systems largely used in petrochemical industries. They serve to transport natural gases or liquids. They are cylindrical tubes and are submitted to the risks of corrosion due to high PH concentrations of the transported liquids in addition to fatigue cracks due to the alternation of pressure-depression of gas along the time, initiating therefore in the tubes body micro-cracks that can propagate abruptly to lead to failure. The development of the prognostic process for such systems increases largely their performance and their availability, as well decreases the global cost of their missions. Therefore, this paper deals with a new prognostic approach to improve the performance of these pipelines. Only the first mode of crack, that is, the opening mode, is considered.

Jaoude, Abdo Abou; El-Tawil, Khaled; Noura, Hassan; Ouladsine, Mustapha

2012-01-01T23:59:59.000Z

300

Time-Constrained Loop Pipelining  

E-Print Network (OSTI)

This paper addresses the problem of Time-Constrained Loop Pipelining, i.e. given a fixed throughput, finding a schedule of a loop which minimizes resource requirements. We propose a methodology, called TCLP, based on dividing the problem into two simpler and independent tasks: retiming and scheduling. TCLP explores different sets of resources, searchingfor a maximum resource utilization. This reduces area requirements. After a minimum set of resourceshas been found, the execution throughput is increased and the number of registers required by the loop schedule is reduced. TCLP attempts to generate a schedule which minimizes cost in time and area (resources and registers). The results show that TCLP obtains optimal schedules in most cases. 1 Introduction This paper presents TCLP, a methodology to solve TimeConstrained Loop Pipelining. TCLP is NP-complete [3]. Two types of timing constraints (TCs) have been considered in the literature: local TCs to specify minimum and/or maximum TCs ...

Fermn Sanchez; Jordi Cortadella

1995-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Pipeline-Centric Provenance Model  

E-Print Network (OSTI)

In this paper we propose a new provenance model which is tailored to a class of workflow-based applications. We motivate the approach with use cases from the astronomy community. We generalize the class of applications the approach is relevant to and propose a pipeline-centric provenance model. Finally, we evaluate the benefits in terms of storage needed by the approach when applied to an astronomy application.

Groth, Paul; Juve, Gideon; Mehta, Gaurang; Berriman, Bruce

2010-01-01T23:59:59.000Z

302

An Oil Pipeline Design Problem  

Science Conference Proceedings (OSTI)

We consider a given set of offshore platforms and onshore wells producing known (or estimated) amounts of oil to be connected to a port. Connections may take place directly between platforms, well sites, and the port, or may go through connection points ... Keywords: Algorithms: interactive branch-and-bound with valid inequalities. industries, Applications: design problem-formulation and analysis. programming, Integer, Networks/graphs, Petroleum/natural gas: oil pipeline network design

Jack Brimberg; Pierre Hansen; Keh-Wei Lin; Nenad Mladenovic; Michčle Breton

2003-03-01T23:59:59.000Z

303

Questions and Issues on Hydrogen Pipeline Transmission of Hydrogen  

E-Print Network (OSTI)

Questions and Issues on Hydrogen Pipelines Pipeline Transmission of Hydrogen Doe Hydrogen Pipeline Working Group Meeting August 31, 2005 #12;Pipeline Transmission of Hydrogen --- 2 Copyright: Air Liquide Pipeline Inventory Breakdown by gases 0 500 1000 1500 2000 2500 3000 3500 KM N2 2956 km O2 3447 km H2 1736

304

EIA - Natural Gas Pipeline System - Western Region  

U.S. Energy Information Administration (EIA) Indexed Site

Western Region Western Region About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Pipelines in the Western Region Overview | Transportation South | Transportation North | Regional Pipeline Companies & Links Overview Ten interstate and nine intrastate natural gas pipeline companies provide transportation services to and within the Western Region (Arizona, California, Idaho, Nevada, Oregon, and Washington), the fewest number serving any region (see Table below). Slightly more than half the capacity entering the region is on natural gas pipeline systems that carry natural gas from the Rocky Mountain area and the Permian and San Juan basins. These latter systems enter the region at the New Mexico-Arizona and Nevada-Utah State lines. The rest of the capacity arrives on natural gas pipelines that access Canadian natural gas at the Idaho and Washington State border crossings with British Columbia, Canada.

305

Kinder Morgan Central Florida Pipeline Ethanol Project  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

KINDER MORGAN CENTRAL FLORIDA PIPELINE ETHANOL PROJECT ď‚· In December 2008, Kinder Morgan began transporting commercial batches of denatured ethanol along with gasoline shipments in its 16-inch Central Florida Pipeline (CFPL) from Tampa to Orlando, making CFPL the first transmarket gasoline pipeline in the United States to do so. The 16-inch pipeline previously only transported regular and premium gasoline. ď‚· Kinder Morgan invested approximately $10 million to modify the line for ethanol shipments which involved chemically cleaning the pipeline, replacing pipeline equipment that was incompatible with ethanol and expanding storage capacity at its Orlando terminal to handle ethanol shipments. ď‚· Kinder Morgan is responding to customer interest in ethanol blending. Our Florida

306

Petroleum Supply Annual  

Annual Energy Outlook 2012 (EIA)

7.PDF Table 37. Movements of Crude Oil and Petroleum Products by Pipeline Between PAD Districts, January 2012 (Thousand Barrels) Commodity From 1 to From 2 to From 3 to 2 3 1 3 4 1...

307

Final joint environmental assessment for the construction and routine operation of a 12-kilovolt (KV) overhead powerline right-of-way, and formal authorization for a 10-inch and 8-inch fresh water pipeline right-of-way, Naval Petroleum Reserve No. 1, Kern County, California  

SciTech Connect

The purpose and need of the proposed action, which is the installation of an overhead powerline extension from an Naval Petroleum Reserve No. 1 (NPR-1) power source to the WKWD Station A, is to significantly reduce NPR-1`s overall utility costs. While the proposed action is independently justified on its own merits and is not tied to the proposed NPR-1 Cogeneration Facility, the proposed action would enable DOE to tie the NPR-1 fresh water pumps at Station A into the existing NPR-1 electrical distribution system. With the completion of the cogeneration facility in late 1994 or early 1995, the proposed action would save additional utility costs. This report deals with the environmental impacts of the construction of the powerline and the water pipeline. In addition, information is given about property rights and attaining permission to cross the property of proposed affected owners.

1994-10-01T23:59:59.000Z

308

Ultrasonic Computerized Tomography of Pipelines for Continuous ...  

Science Conference Proceedings (OSTI)

Commercial handheld thickness gauging devices require direct access to pipelines and find limited applications due to the presence of physical obstacles or the ...

309

Measuring wall forces in a slurry pipeline.  

E-Print Network (OSTI)

??Slurry transport is a key material handling technology in a number of industries. In oilsands ore transport, slurry pipelining also promotes conditioning to release and… (more)

El-Sayed, Suheil

2010-01-01T23:59:59.000Z

310

Pipeline constraints in wholesale natural gas markets.  

E-Print Network (OSTI)

??Natural gas markets in the United States depend on an extensive network of pipelines to transport gas from production fields to end users. While these… (more)

Avalos, Roger George.

2012-01-01T23:59:59.000Z

311

EIA-802 WEEKLY PRODUCT PIPELINE REPORT INSTRUCTIONS  

U.S. Energy Information Administration (EIA)

EIA-802, Weekly Product Pipeline Report Page 3 PART 4. DIESEL FUEL DOWNGRADED ULSD-- EIA Product Code 465, “distillate fuel oil 15 ppm sulfur

312

Hazardous Liquid Pipelines and Storage Facilities (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

This statute regulates the permitting, construction, monitoring, and operation of pipelines transporting hazardous liquids, including petroleum products and coal slurries. The definition used in...

313

Detection and Location of Damage on Pipelines  

SciTech Connect

The INEEL has developed and successfully tested a real-time pipeline damage detection and location system. This system uses porous metal resistive traces applied to the pipe to detect and locate damage. The porous metal resistive traces are sprayed along the length of a pipeline. The unique nature and arrangement of the traces allows locating the damage in real time along miles of pipe. This system allows pipeline operators to detect damage when and where it is occurring, and the decision to shut down a transmission pipeline can be made with actual real-time data, instead of conservative estimates from visual inspection above the area.

Karen A. Moore; Robert Carrington; John Richardson

2003-11-01T23:59:59.000Z

314

GLAST (FERMI) Data-Processing Pipeline  

Science Conference Proceedings (OSTI)

The Data Processing Pipeline ('Pipeline') has been developed for the Gamma-Ray Large Area Space Telescope (GLAST) which launched June 11, 2008. It generically processes graphs of dependent tasks, maintaining a full record of its state, history and data products. The Pipeline is used to automatically process the data down-linked from the satellite and to deliver science products to the GLAST collaboration and the Science Support Center and has been in continuous use since launch with great success. The pipeline handles up to 2000 concurrent jobs and in reconstructing science data produces approximately 750GB of data products using 1/2 CPU-year of processing time per day.

Flath, Daniel L.; Johnson, Tony S.; Turri, Massimiliano; Heidenreich, Karen A.; /SLAC

2011-08-12T23:59:59.000Z

315

Natural Gas Pipeline and System Expansions  

U.S. Energy Information Administration (EIA)

Energy Information Administration / Natural Gas Monthly April 1997 vii This special report examines recent expansions to the North American natural gas pipeline network

316

ORNL Genome Analysis Pipeline - Yeast (Saccharomyces cerevisiae...  

NLE Websites -- All DOE Office Websites (Extended Search)

Grail (Microbial Gene Prediction System Internet Link) GrailEXP Genome Analysis Pipeline DomainParser PROSPECT (PROtein Structure Prediction and Evaluation Computer Toolkit)...

317

Why improve the pipeline for comparative transcriptomics?  

NLE Websites -- All DOE Office Websites (Extended Search)

Plans Educational Resources MyJGI: Information for Collaborators Why improve the pipeline for comparative transcriptomics? The genomes of several brown rot and white rot fungi...

318

Acoustic system for communication in pipelines  

DOE Patents (OSTI)

A system for communication in a pipe, or pipeline, or network of pipes containing a fluid. The system includes an encoding and transmitting sub-system connected to the pipe, or pipeline, or network of pipes that transmits a signal in the frequency range of 3-100 kHz into the pipe, or pipeline, or network of pipes containing a fluid, and a receiver and processor sub-system connected to the pipe, or pipeline, or network of pipes containing a fluid that receives said signal and uses said signal for a desired application.

Martin, II, Louis Peter (San Ramon, CA); Cooper, John F. (Oakland, CA)

2008-09-09T23:59:59.000Z

319

4.6.2. Alaska Pipeline  

Science Conference Proceedings (OSTI)

4. Process Modeling 4.6. Case Studies in Process Modeling 4.6.2. Alaska Pipeline. Non-Homogeneous Variances, This ...

2012-03-31T23:59:59.000Z

320

Materials Solutions for Hydrogen Delivery in Pipelines  

NLE Websites -- All DOE Office Websites (Extended Search)

welding filler wires and processes that would be suitable for construction of new pipeline infrastructure - To develop barrier coatings for minimizing hydrogen permeation in...

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Exploring Pipeline Dynamics to Connect New Markets  

U.S. Energy Information Administration (EIA)

Gas Shales in the United States. 8. Cumulative Unconventional Production, 2007-2030 (trillion cubic feet) 9. Rockies Express Pipeline (REX) 10.

322

Pipeline and Gas Journal`s 1998 annual pipeline directory and equipment guide  

Science Conference Proceedings (OSTI)

The tables provide information on line pipe sizes, walls, grades, and manufacturing processes. Data are presented by manufacturer within each country. Also tabulated are engineering and construction service companies, crude oil pipeline companies, products pipeline companies, natural gas pipeline companies, gas distribution companies, and municipal gas systems in the US. There is also a Canadian and an international directory.

NONE

1998-09-01T23:59:59.000Z

323

The impact of pipelining on energy per operation in field-programmable gate arrays  

E-Print Network (OSTI)

Abstract. This paper investigates experimentally the quantitative impact of pipelining on energy per operation for two representative FPGA devices: a 0.13µm CMOS high density/high speed FPGA (Altera Stratix EP1S40), and a 0.18µm CMOS low-cost FPGA (Xilinx XC2S200). The results are obtained by both measurements and execution of vendor-supplied tools for power estimation. It is found that pipelining can reduce the amount of energy per operation by between 40 % and 90%. Further reduction in energy consumption can be achieved by power-aware clustering, although the effect becomes less pronounced for circuits with a large number of pipeline stages. 1.

Steven J. E. Wilton; Su-shin Ang; Wayne Luk

2004-01-01T23:59:59.000Z

324

Optimization of energy and throughput for pipelined VLSI interconnect  

E-Print Network (OSTI)

given a wire length, optimized pipeline energy decreases asFigure 7 shows pipeline energy per bit versus wire length asOptimal pipeline depth is proportional to wire length, and

Hamilton, Kevin Clark

2010-01-01T23:59:59.000Z

325

Structural Genomics of Minimal Organisms: Pipeline and Results  

E-Print Network (OSTI)

of Minimal Organisms: Pipeline and Results Sung-Hou Kim*,~500 genes, respectively). Pipeline: To achieve our mission,determination. Over all pipeline schemes for the single-path

Kim, Sung-Hou

2008-01-01T23:59:59.000Z

326

Trenches Under The Pipeline: The Educational Trajectories of Chicano Male Continuation High School Students  

E-Print Network (OSTI)

Trenches Under The Pipeline: The Educational Trajectories ofnavigate the educational pipeline, continuation high school

Malagon, Maria

2010-01-01T23:59:59.000Z

327

Petroleum Supply Annual  

U.S. Energy Information Administration (EIA) Indexed Site

0.PDF Table 10. PAD District 4 - Daily Average Supply and Disposition of Crude Oil and Petroleum Products, January 2011 (Thousand Barrels per Day) Commodity Supply Disposition...

328

Petroleum Supply Monthly  

Gasoline and Diesel Fuel Update (EIA)

December 2011 Table 21. PAD District 5 - Supply, Disposition, and Ending Stocks of Crude Oil and Petroleum Products, December 2011 (Thousand Barrels) Commodity Supply Disposition...

329

Petroleum Supply Annual  

Annual Energy Outlook 2012 (EIA)

TABLE8.PDF Table 8. PAD District 3 - Daily Average Supply and Disposition of Crude Oil and Petroleum Products, January 2011 (Thousand Barrels per Day) Commodity Supply Disposition...

330

Petroleum Supply Annual  

U.S. Energy Information Administration (EIA) Indexed Site

TABLE4.PDF Table 4. PAD District 1 - Daily Average Supply and Disposition of Crude Oil and Petroleum Products, January 2011 (Thousand Barrels per Day) Commodity Supply Disposition...

331

Petroleum Supply Monthly  

Annual Energy Outlook 2012 (EIA)

May 2013 Table 21. PAD District 5 - Supply, Disposition, and Ending Stocks of Crude Oil and Petroleum Products, May 2013 (Thousand Barrels) Commodity Supply Disposition Ending...

332

Petroleum Supply Monthly  

U.S. Energy Information Administration (EIA) Indexed Site

5 May 2013 Table 19. PAD District 4 - Daily Average Supply and Disposition of Crude Oil and Petroleum Products, May 2013 (Thousand Barrels per Day) Commodity Supply Disposition...

333

Petroleum Supply Monthly  

Gasoline and Diesel Fuel Update (EIA)

December 2011 Table 11. PAD District 2 - Daily Average Supply and Disposition of Crude Oil and Petroleum Products, December 2011 (Thousand Barrels per Day) Commodity Supply...

334

Petroleum Supply Annual  

Gasoline and Diesel Fuel Update (EIA)

TABLE6.PDF Table 6. PAD District 2 - Daily Average Supply and Disposition of Crude Oil and Petroleum Products, January 2011 (Thousand Barrels per Day) Commodity Supply Disposition...

335

Petroleum Supply Monthly  

Annual Energy Outlook 2012 (EIA)

December 2011 Table 13. PAD District 3 - Supply, Disposition, and Ending Stocks of Crude Oil and Petroleum Products, December 2011 (Thousand Barrels) Commodity Supply Disposition...

336

Fact book: synthetic pipeline gas from coal. 1982 update  

SciTech Connect

This book illustrates the major advantages of synthetic pipeline gas from coal. Progress on many of the coal gasification projects envisioned over the past decade has been thwarted by regulatory, permitting, and financing delays. The rationale for developing a synthetic pipeline gas industry remains as strong as ever from the nation's viewpoint, and the pioneer US commercial scale high-Btu coal gasification plant is now under construction-the Great Plains coal gasification plant in North Dakota. Also, the US Synthetic Fuels Corporation is now operational and can move forward to provide the guarantees which are necessary to overcome the financial barriers to a commercial synfuels capability in the United States. Compared to other principal means of utilizing America's vast coal reserves, coal gasification uses coal and land more efficiently, uses less water, emits less air pollutants, requires less capital and results in a lower cost of energy to consumers. (DP)

Not Available

1982-01-01T23:59:59.000Z

337

Remaining Sites Verification Package for the 100-F-26:15 Miscellaneous Pipelines Associated with the 132-F-6, 1608-F Waste Water Pumping Station, Waste Site Reclassification Form 2007-031  

SciTech Connect

The 100-F-26:15 waste site consisted of the remnant portions of underground process effluent and floor drain pipelines that originated at the 105-F Reactor. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

L. M. Dittmer

2008-03-18T23:59:59.000Z

338

Hydrogen Permeability and Integrity of Hydrogen Delivery Pipelines  

NLE Websites -- All DOE Office Websites (Extended Search)

Permeability and Permeability and Integrity of Hydrogen Delivery Pipelines Z. Feng*, L.M. Anovitz*, J.G. Blencoe*, S. Babu*, and P. S. Korinko** * Oak Ridge National Laboratory * Savannah River National Laboratory August 30, 2005 2 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Partners and Collaborators * Oak Ridge National Laboratory - Project lead * Savannah River National Laboratory - Low H 2 pressure permeation test * Edison Welding Institute - Pipeline materials * Lincoln Electric Company - Welding electrode and weld materials for pipelines * Trans Canada - Commercial welding of pipelines and industry expectations * DOE Pipeline Working Group and Tech Team activities - FRP Hydrogen Pipelines - Materials Solutions for Hydrogen Delivery in Pipelines - Natural Gas Pipelines for Hydrogen Use

339

Fuel Cell Technologies Office: 2005 Hydrogen Pipeline Working Group  

NLE Websites -- All DOE Office Websites (Extended Search)

2005 Hydrogen Pipeline 2005 Hydrogen Pipeline Working Group Workshop to someone by E-mail Share Fuel Cell Technologies Office: 2005 Hydrogen Pipeline Working Group Workshop on Facebook Tweet about Fuel Cell Technologies Office: 2005 Hydrogen Pipeline Working Group Workshop on Twitter Bookmark Fuel Cell Technologies Office: 2005 Hydrogen Pipeline Working Group Workshop on Google Bookmark Fuel Cell Technologies Office: 2005 Hydrogen Pipeline Working Group Workshop on Delicious Rank Fuel Cell Technologies Office: 2005 Hydrogen Pipeline Working Group Workshop on Digg Find More places to share Fuel Cell Technologies Office: 2005 Hydrogen Pipeline Working Group Workshop on AddThis.com... Publications Program Publications Technical Publications Educational Publications Newsletter Program Presentations

340

Fuel Cell Technologies Office: 2007 Hydrogen Pipeline Working Group  

NLE Websites -- All DOE Office Websites (Extended Search)

2007 Hydrogen Pipeline 2007 Hydrogen Pipeline Working Group Workshop to someone by E-mail Share Fuel Cell Technologies Office: 2007 Hydrogen Pipeline Working Group Workshop on Facebook Tweet about Fuel Cell Technologies Office: 2007 Hydrogen Pipeline Working Group Workshop on Twitter Bookmark Fuel Cell Technologies Office: 2007 Hydrogen Pipeline Working Group Workshop on Google Bookmark Fuel Cell Technologies Office: 2007 Hydrogen Pipeline Working Group Workshop on Delicious Rank Fuel Cell Technologies Office: 2007 Hydrogen Pipeline Working Group Workshop on Digg Find More places to share Fuel Cell Technologies Office: 2007 Hydrogen Pipeline Working Group Workshop on AddThis.com... Publications Program Publications Technical Publications Educational Publications Newsletter Program Presentations

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Upheaval Buckling of Offshore Pipelines in Homogeneous and Layered Soils.  

E-Print Network (OSTI)

??Offshore oil and gas pipelines are commonly buried below the seabed to provide environmental stability and protection. Many of these pipelines are prone to upheaval… (more)

Deljoui, Porang

2012-01-01T23:59:59.000Z

342

Sequencing Technologies and Computational pipelines at the JGI  

NLE Websites -- All DOE Office Websites (Extended Search)

Sequencing Technologies and Computational pipelines at the JGI Sequencing Technologies and Computational pipelines at the JGI September 17, 2013 JGI logo 2 James Han, JGI...

343

BLOCKAGE DETECTION IN NATURAL GAS PIPELINES BY TRANSIENT ANALYSIS.  

E-Print Network (OSTI)

??Pipelines are the most reliable means for the transportation of natural gas. A major problem of flow assurance in natural gas pipelines is solid deposition… (more)

ADELEKE, NAJEEM

2010-01-01T23:59:59.000Z

344

Modeling fatique behavior of dents in petroleum pipelines.  

E-Print Network (OSTI)

??Dents in pipelines can seriously reduce the design life of a pipeline. Dents cause stress concentrations to develop which make dents susceptible to fatigue failures.… (more)

Hoffmann, Roger Lynn

2012-01-01T23:59:59.000Z

345

Mobile sensor network to monitor wastewater collection pipelines  

E-Print Network (OSTI)

we divide the pipeline in equal length segment(i.e. 10we divide the pipeline into segments with equal length (i.e.

Lim, Jungsoo

2012-01-01T23:59:59.000Z

346

Penitas, TX Natural Gas Pipeline Imports From Mexico (Million...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Penitas, TX Natural Gas Pipeline Imports From Mexico (Million Cubic Feet) Penitas, TX Natural Gas Pipeline Imports From Mexico...

347

Efficient Compression of CO2 and Pipeline Transport ...  

Science Conference Proceedings (OSTI)

... Final pressure around 1,500 to 2,200 psia for pipeline transport or re-injection. ... Perform optimization of pipeline booster stations ...

2012-10-22T23:59:59.000Z

348

Hidalgo, TX Natural Gas Pipeline Imports From Mexico (Million...  

Gasoline and Diesel Fuel Update (EIA)

View History: Annual Download Data (XLS File) Hidalgo, TX Natural Gas Pipeline Imports From Mexico (Million Cubic Feet) Hidalgo, TX Natural Gas Pipeline Imports From Mexico...

349

Alamo, TX Natural Gas Pipeline Exports to Mexico (Million Cubic...  

Gasoline and Diesel Fuel Update (EIA)

View History: Monthly Annual Download Data (XLS File) Alamo, TX Natural Gas Pipeline Exports to Mexico (Million Cubic Feet) Alamo, TX Natural Gas Pipeline Exports to Mexico...

350

St. Clair, MI Natural Gas Pipeline Exports to Canada (Million...  

Gasoline and Diesel Fuel Update (EIA)

View History: Monthly Annual Download Data (XLS File) St. Clair, MI Natural Gas Pipeline Exports to Canada (Million Cubic Feet) St. Clair, MI Natural Gas Pipeline Exports to...

351

Ogilby, CA Natural Gas Pipeline Exports to Mexico (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

View History: Monthly Annual Download Data (XLS File) Ogilby, CA Natural Gas Pipeline Exports to Mexico (Million Cubic Feet) Ogilby, CA Natural Gas Pipeline Exports to Mexico...

352

EIA - Natural Gas Pipeline Network - Regional Overview and Links  

Gasoline and Diesel Fuel Update (EIA)

based on data through 20072008 with selected updates Regional Overviews and Links to Pipeline Companies Through a series of interconnecting interstate and intrastate pipelines the...

353

Nevada Natural Gas Pipeline and Distribution Use Price (Dollars...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Nevada Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic Feet) Nevada Natural Gas Pipeline and Distribution...

354

Idaho Natural Gas Pipeline and Distribution Use (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Idaho Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Idaho Natural Gas Pipeline and Distribution Use (Million Cubic...

355

Delaware Natural Gas Pipeline and Distribution Use Price (Dollars...  

Gasoline and Diesel Fuel Update (EIA)

View History: Annual Download Data (XLS File) Delaware Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic Feet) Delaware Natural Gas Pipeline and...

356

Kansas Natural Gas Pipeline and Distribution Use Price (Dollars...  

Gasoline and Diesel Fuel Update (EIA)

View History: Annual Download Data (XLS File) Kansas Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic Feet) Kansas Natural Gas Pipeline and Distribution...

357

California Natural Gas Pipeline and Distribution Use Price (Dollars...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Annual Download Data (XLS File) California Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic Feet) California Natural Gas Pipeline and...

358

California Natural Gas Pipeline and Distribution Use (Million...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Annual Download Data (XLS File) California Natural Gas Pipeline and Distribution Use (Million Cubic Feet) California Natural Gas Pipeline and Distribution Use...

359

Nevada Natural Gas Pipeline and Distribution Use (Million Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Annual Download Data (XLS File) Nevada Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Nevada Natural Gas Pipeline and Distribution Use (Million Cubic...

360

Delaware Natural Gas Pipeline and Distribution Use (Million Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Annual Download Data (XLS File) Delaware Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Delaware Natural Gas Pipeline and Distribution Use (Million...

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Penitas, TX Natural Gas Pipeline Exports to Mexico (Dollars per...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Monthly Annual Download Data (XLS File) Penitas, TX Natural Gas Pipeline Exports to Mexico (Dollars per Thousand Cubic Feet) Penitas, TX Natural Gas Pipeline Exports...

362

Alaska Natural Gas Pipeline and Distribution Use (Million Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Annual Download Data (XLS File) Alaska Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Alaska Natural Gas Pipeline and Distribution Use (Million Cubic...

363

Minnesota Natural Gas Pipeline and Distribution Use (Million...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Annual Download Data (XLS File) Minnesota Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Minnesota Natural Gas Pipeline and Distribution Use (Million...

364

Oregon Natural Gas Pipeline and Distribution Use (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Oregon Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Oregon Natural Gas Pipeline and Distribution Use (Million Cubic...

365

Alabama Natural Gas Pipeline and Distribution Use Price (Dollars...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Alabama Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic Feet) Alabama Natural Gas Pipeline and...

366

Roma, Texas Natural Gas Pipeline Exports to Mexico (Million Cubic...  

Gasoline and Diesel Fuel Update (EIA)

View History: Monthly Annual Download Data (XLS File) Roma, Texas Natural Gas Pipeline Exports to Mexico (Million Cubic Feet) Roma, Texas Natural Gas Pipeline Exports to Mexico...

367

Kansas Natural Gas Pipeline and Distribution Use (Million Cubic...  

Gasoline and Diesel Fuel Update (EIA)

View History: Annual Download Data (XLS File) Kansas Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Kansas Natural Gas Pipeline and Distribution Use (Million Cubic...

368

Calexico, CA Natural Gas Pipeline Exports to Mexico (Million...  

Annual Energy Outlook 2012 (EIA)

View History: Monthly Annual Download Data (XLS File) Calexico, CA Natural Gas Pipeline Exports to Mexico (Million Cubic Feet) Calexico, CA Natural Gas Pipeline Exports to Mexico...

369

Utah Natural Gas Pipeline and Distribution Use (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Utah Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Utah Natural Gas Pipeline and Distribution Use (Million Cubic...

370

Washington Natural Gas Pipeline and Distribution Use (Million...  

Gasoline and Diesel Fuel Update (EIA)

View History: Annual Download Data (XLS File) Washington Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Washington Natural Gas Pipeline and Distribution Use...

371

Alabama Natural Gas Pipeline and Distribution Use (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Alabama Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Alabama Natural Gas Pipeline and Distribution Use (Million...

372

Penitas, TX Natural Gas Pipeline Exports to Mexico (Million Cubic...  

Gasoline and Diesel Fuel Update (EIA)

View History: Monthly Annual Download Data (XLS File) Penitas, TX Natural Gas Pipeline Exports to Mexico (Million Cubic Feet) Penitas, TX Natural Gas Pipeline Exports to Mexico...

373

Massachusetts Natural Gas Pipeline and Distribution Use (Million...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Annual Download Data (XLS File) Massachusetts Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Massachusetts Natural Gas Pipeline and Distribution Use...

374

Kentucky Natural Gas Pipeline and Distribution Use (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Kentucky Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Kentucky Natural Gas Pipeline and Distribution Use (Million...

375

Florida Natural Gas Pipeline and Distribution Use Price (Dollars...  

Gasoline and Diesel Fuel Update (EIA)

View History: Annual Download Data (XLS File) Florida Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic Feet) Florida Natural Gas Pipeline and...

376

Indiana Natural Gas Pipeline and Distribution Use (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Indiana Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Indiana Natural Gas Pipeline and Distribution Use (Million...

377

Clint, TX Natural Gas Pipeline Exports to Mexico (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

View History: Monthly Annual Download Data (XLS File) Clint, TX Natural Gas Pipeline Exports to Mexico (Million Cubic Feet) Clint, TX Natural Gas Pipeline Exports to Mexico...

378

Virginia Natural Gas Pipeline and Distribution Use (Million Cubic...  

Gasoline and Diesel Fuel Update (EIA)

View History: Annual Download Data (XLS File) Virginia Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Virginia Natural Gas Pipeline and Distribution Use (Million...

379

Hidalgo, TX Natural Gas Pipeline Exports to Mexico (Million Cubic...  

Gasoline and Diesel Fuel Update (EIA)

View History: Monthly Annual Download Data (XLS File) Hidalgo, TX Natural Gas Pipeline Exports to Mexico (Million Cubic Feet) Hidalgo, TX Natural Gas Pipeline Exports to Mexico...

380

Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation  

NLE Websites -- All DOE Office Websites (Extended Search)

1 January 2005 HYDROGEN EMBRITTLEMENT OF PIPELINE STEELS: CAUSES AND REMEDIATION P. Sofronis, I. Robertson, D. Johnson University of Illinois at Urbana-Champaign Hydrogen Pipeline...

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Alamo, TX Natural Gas Pipeline Imports From Mexico (Million Cubic...  

Gasoline and Diesel Fuel Update (EIA)

View History: Annual Download Data (XLS File) Alamo, TX Natural Gas Pipeline Imports From Mexico (Million Cubic Feet) Alamo, TX Natural Gas Pipeline Imports From Mexico (Million...

382

Ohio Natural Gas Pipeline and Distribution Use (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Ohio Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Ohio Natural Gas Pipeline and Distribution Use (Million Cubic...

383

Texas Natural Gas Pipeline and Distribution Use (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Texas Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Texas Natural Gas Pipeline and Distribution Use (Million Cubic...

384

Louisiana Natural Gas Pipeline and Distribution Use (Million...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Annual Download Data (XLS File) Louisiana Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Louisiana Natural Gas Pipeline and Distribution Use (Million...

385

Hawaii Natural Gas Pipeline and Distribution Use (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Hawaii Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Hawaii Natural Gas Pipeline and Distribution Use (Million Cubic...

386

Hidalgo, TX Natural Gas Pipeline Exports to Mexico (Dollars per...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Monthly Annual Download Data (XLS File) Hidalgo, TX Natural Gas Pipeline Exports to Mexico (Dollars per Thousand Cubic Feet) Hidalgo, TX Natural Gas Pipeline Exports...

387

Georgia Natural Gas Pipeline and Distribution Use (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Georgia Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Georgia Natural Gas Pipeline and Distribution Use (Million...

388

Oklahoma Natural Gas Pipeline and Distribution Use Price (Dollars...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Annual Download Data (XLS File) Oklahoma Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic Feet) Oklahoma Natural Gas Pipeline and...

389

Florida Natural Gas Pipeline and Distribution Use (Million Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Annual Download Data (XLS File) Florida Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Florida Natural Gas Pipeline and Distribution Use (Million...

390

Vermont Natural Gas Pipeline and Distribution Use (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Vermont Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Vermont Natural Gas Pipeline and Distribution Use (Million...

391

Massachusetts Natural Gas Pipeline and Distribution Use Price...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Massachusetts Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic Feet) Massachusetts Natural Gas Pipeline...

392

Arizona Natural Gas Pipeline and Distribution Use (Million Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Annual Download Data (XLS File) Arizona Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Arizona Natural Gas Pipeline and Distribution Use (Million...

393

Montana Natural Gas Pipeline and Distribution Use (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Montana Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Montana Natural Gas Pipeline and Distribution Use (Million...

394

Wisconsin Natural Gas Pipeline and Distribution Use Price (Dollars...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Annual Download Data (XLS File) Wisconsin Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic Feet) Wisconsin Natural Gas Pipeline and...

395

Wisconsin Natural Gas Pipeline and Distribution Use (Million...  

Gasoline and Diesel Fuel Update (EIA)

View History: Annual Download Data (XLS File) Wisconsin Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Wisconsin Natural Gas Pipeline and Distribution Use (Million...

396

Vermont Natural Gas Pipeline and Distribution Use Price (Dollars...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Vermont Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic Feet) Vermont Natural Gas Pipeline and...

397

Wyoming Natural Gas Pipeline and Distribution Use (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Wyoming Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Wyoming Natural Gas Pipeline and Distribution Use (Million...

398

EIA - Natural Gas Pipeline Network - Generalized Natural Gas...  

Annual Energy Outlook 2012 (EIA)

Gas based on data through 20072008 with selected updates Generalized Natural Gas Pipeline Capacity Design Schematic Generalized Natural Gas Pipeline Capcity Design Schematic...

399

Fuel Cell Technologies Office: Hydrogen Pipeline Working Group  

NLE Websites -- All DOE Office Websites (Extended Search)

- Energy Efficiency and Renewable Energy Fuel Cell Technologies Office Hydrogen Pipeline Working Group The Hydrogen Pipeline Working Group of research and industry experts...

400

Fuel Cell Technologies Office: 2005 Hydrogen Pipeline Working...  

NLE Websites -- All DOE Office Websites (Extended Search)

- Energy Efficiency and Renewable Energy Fuel Cell Technologies Office 2005 Hydrogen Pipeline Working Group Workshop DOE held a Hydrogen Pipeline Working Group Workshop August...

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Nebraska Natural Gas Pipeline and Distribution Use (Million Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Annual Download Data (XLS File) Nebraska Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Nebraska Natural Gas Pipeline and Distribution Use (Million...

402

Arkansas Natural Gas Pipeline and Distribution Use (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Arkansas Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Arkansas Natural Gas Pipeline and Distribution Use (Million...

403

Pennsylvania Natural Gas Pipeline and Distribution Use (Million...  

Gasoline and Diesel Fuel Update (EIA)

View History: Annual Download Data (XLS File) Pennsylvania Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Pennsylvania Natural Gas Pipeline and Distribution Use...

404

Niagara Falls, NY Natural Gas Pipeline Exports to Canada (Million...  

Gasoline and Diesel Fuel Update (EIA)

View History: Monthly Annual Download Data (XLS File) Niagara Falls, NY Natural Gas Pipeline Exports to Canada (Million Cubic Feet) Niagara Falls, NY Natural Gas Pipeline Exports...

405

Tennessee Natural Gas Pipeline and Distribution Use (Million...  

Gasoline and Diesel Fuel Update (EIA)

View History: Annual Download Data (XLS File) Tennessee Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Tennessee Natural Gas Pipeline and Distribution Use (Million...

406

Maine Natural Gas Pipeline and Distribution Use Price (Dollars...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Maine Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic Feet) Maine Natural Gas Pipeline and Distribution...

407

Douglas, AZ Natural Gas Pipeline Exports to Mexico (Million Cubic...  

Gasoline and Diesel Fuel Update (EIA)

View History: Monthly Annual Download Data (XLS File) Douglas, AZ Natural Gas Pipeline Exports to Mexico (Million Cubic Feet) Douglas, AZ Natural Gas Pipeline Exports to Mexico...

408

Mississippi Natural Gas Pipeline and Distribution Use (Million...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Annual Download Data (XLS File) Mississippi Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Mississippi Natural Gas Pipeline and Distribution Use...

409

Otay Mesa, CA Natural Gas Pipeline Exports to Mexico (Million...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Otay Mesa, CA Natural Gas Pipeline Exports to Mexico (Million Cubic Feet) Otay Mesa, CA Natural Gas Pipeline Exports to Mexico...

410

Connecticut Natural Gas Pipeline and Distribution Use (Million...  

Gasoline and Diesel Fuel Update (EIA)

View History: Annual Download Data (XLS File) Connecticut Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Connecticut Natural Gas Pipeline and Distribution Use...

411

Maine Natural Gas Pipeline and Distribution Use (Million Cubic...  

Gasoline and Diesel Fuel Update (EIA)

View History: Annual Download Data (XLS File) Maine Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Maine Natural Gas Pipeline and Distribution Use (Million Cubic...

412

Rules for Pipeline Public Utilities, Rules for Gas Service and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marketing Administration Other Agencies You are here Home Savings Rules for Pipeline Public Utilities, Rules for Gas Service and Safety (New Hampshire) Rules for Pipeline...

413

Maryland Natural Gas Pipeline and Distribution Use (Million Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Annual Download Data (XLS File) Maryland Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Maryland Natural Gas Pipeline and Distribution Use (Million...

414

Michigan Natural Gas Pipeline and Distribution Use (Million Cubic...  

Gasoline and Diesel Fuel Update (EIA)

View History: Annual Download Data (XLS File) Michigan Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Michigan Natural Gas Pipeline and Distribution Use (Million...

415

NIST/CSM Sensor Could Help Avert Pipeline Failures  

Science Conference Proceedings (OSTI)

... in conventional pipelines by slowly diffusing into the metal. The NIST/CSM sensor, described today at the 7th International Pipeline Conference ...

2012-10-02T23:59:59.000Z

416

Oklahoma Natural Gas Pipeline and Distribution Use (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Oklahoma Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Oklahoma Natural Gas Pipeline and Distribution Use (Million...

417

Ogilby, CA Natural Gas Pipeline Exports to Mexico (Dollars per...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Monthly Annual Download Data (XLS File) Ogilby, CA Natural Gas Pipeline Exports to Mexico (Dollars per Thousand Cubic Feet) Ogilby, CA Natural Gas Pipeline Exports...

418

Colorado Natural Gas Pipeline and Distribution Use (Million Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Annual Download Data (XLS File) Colorado Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Colorado Natural Gas Pipeline and Distribution Use (Million...

419

In Natural Gas Pipelines, NIST Goes with the Flow  

Science Conference Proceedings (OSTI)

... flows from producers to consumers through a complex pipeline network totaling ... pressures an order of magnitude smaller than pipelines used in ...

2013-05-01T23:59:59.000Z

420

Niagara Falls, NY Natural Gas Pipeline Imports From Canada (Million...  

Gasoline and Diesel Fuel Update (EIA)

View History: Monthly Annual Download Data (XLS File) Niagara Falls, NY Natural Gas Pipeline Imports From Canada (Million Cubic Feet) Niagara Falls, NY Natural Gas Pipeline...

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Rio Bravo, Texas Natural Gas Pipeline Exports to Mexico (Million...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Monthly Annual Download Data (XLS File) Rio Bravo, Texas Natural Gas Pipeline Exports to Mexico (Million Cubic Feet) Rio Bravo, Texas Natural Gas Pipeline Exports to...

422

Romas, Texas Natural Gas Pipeline Exports (Price) Mexico (Dollars...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Monthly Annual Download Data (XLS File) Romas, Texas Natural Gas Pipeline Exports (Price) Mexico (Dollars per Thousand Cubic Feet) Romas, Texas Natural Gas Pipeline...

423

High-Speed Biomass Recalcitrance Pipeline Speeds Up Bio ...  

High-Speed Biomass Recalcitrance Pipeline Speeds Up Bio-Mass Analysis Robotic pipeline allows for rapid analysis of optimal substrate/enzyme ...

424

December 4, 2007: NETL's Robotic Pipeline Inspection Tool  

Energy.gov (U.S. Department of Energy (DOE))

December 4, 2007The Department's National Energy Technology Laboratory announces the development of a new robotic pipeline inspection tool that could revolutionize the pipeline inspection process....

425

EIS-0488: Cameron Pipeline Expansion Project and Cameron LNG...  

NLE Websites -- All DOE Office Websites (Extended Search)

88: Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project, Cameron Parish, LA EIS-0488: Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project,...

426

"Assessment of the Adequacy of Natural Gas Pipeline Capacity...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

"Assessment of the Adequacy of Natural Gas Pipeline Capacity in the Northeast United States" Report Now Available "Assessment of the Adequacy of Natural Gas Pipeline Capacity in...

427

Assessment of the Adequacy of Natural Gas Pipeline Capacity in...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment of the Adequacy of Natural Gas Pipeline Capacity in the Northeast United States - November 2013 Assessment of the Adequacy of Natural Gas Pipeline Capacity in the...

428

Ruby natural gas pipeline begins service today (July 28, 2011 ...  

U.S. Energy Information Administration (EIA)

El Paso Corporation's Ruby Pipeline (Ruby), the largest natural gas pipeline project dedicated to serving the Western United States since the ...

429

Network Connectivity and Price Convergency: Gas Pipeline Deregulation  

E-Print Network (OSTI)

pipeline tariffs and gas prices were regulated (Mulherin,failed, in equMizing gas prices across the geographicallyNetwork Connectivity and Price Convergence: Gas Pipeline

De Vany, Arthur; Walls, W. David

1993-01-01T23:59:59.000Z

430

South Dakota Natural Gas Pipeline and Distribution Use (Million...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) South Dakota Natural Gas Pipeline and Distribution Use (Million Cubic Feet) South Dakota Natural Gas Pipeline and Distribution Use...

431

Massena, NY Natural Gas Pipeline Exports to Canada (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

View History: Monthly Annual Download Data (XLS File) Massena, NY Natural Gas Pipeline Exports to Canada (Million Cubic Feet) Massena, NY Natural Gas Pipeline Exports to Canada...

432

Nogales, AZ Natural Gas Pipeline Exports to Mexico (Million Cubic...  

Gasoline and Diesel Fuel Update (EIA)

View History: Monthly Annual Download Data (XLS File) Nogales, AZ Natural Gas Pipeline Exports to Mexico (Million Cubic Feet) Nogales, AZ Natural Gas Pipeline Exports to Mexico...

433

Expansion and Change on the U.S. Natural Gas Pipeline Network 2002  

U.S. Energy Information Administration (EIA) Indexed Site

Expansion and Change on the U.S. Natural Gas Pipeline Network 2002 Expansion and Change on the U.S. Natural Gas Pipeline Network 2002 EIA Home > Natural Gas > Natural Gas Analysis Publications Expansion and Change on the U.S. Natural Gas Pipeline Network 2002 Printer-Friendly Version Expansion and Change on the U.S. Natural Gas Pipeline Network - 2002 Text Box: This special report looks at the level of new capacity added to the national natural gas pipeline network in 2002 and the current capability of that network to transport supplies from production areas to U.S. markets. In addition, it examines the amount of additional capacity proposed for development during the next several years and to what degree various proposed projects will improve the deliverability of natural gas to key market areas. Questions or comments on the contents of this article should be directed to James Tobin at james.tobin@eia.doe.gov or (202) 586-4835. james.tobin@eia.doe.gov

434

Remedial investigation report on the abandoned nitric acid pipeline at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

Upper East Fork Poplar Creek OU-2 consists of the Abandoned Nitric Acid Pipeline. This pipeline was installed in 1951 to transport liquid wastes {approximately} 4,800 ft from Buildings 9212, 9215, and 9206 to the S-3 Ponds. Materials known to have been discharged through the pipeline include nitric acid, depleted and enriched uranium, various metal nitrates, salts, and lead skimmings. A total of nineteen locations were chosen to be investigated along the pipeline for the first phase of this Remedial Investigation. Sampling consisted of drilling down to obtain a soil sample at a depth immediately below the pipeline. Additional samples were obtained deeper in the subsurface depending upon the depth of the pipeline, the depth of the water table, and the point of auger refusal. The nineteen samples collected below the pipeline were analyzed by the Y-12 Plant laboratory for metals, nitrate/nitrite, and isotopic uranium. Samples collected from three boreholes were also analyzed for volatile organic compounds because these samples produced a response with organic vapor monitoring equipment. The results of the baseline human health risk assessment for the Abandoned Nitric Acid Pipeline contaminants of potential concern show no unacceptable risks to human health via incidental ingestion of soil, inhalation of dust, dermal contact with the soil, or external exposure to radionuclides in the ANAP soils, under the construction worker and/or the residential land-use scenarios.

Not Available

1993-12-01T23:59:59.000Z

435

EIA - Natural Gas Pipeline System - Southwest Region  

U.S. Energy Information Administration (EIA) Indexed Site

Southwest Region Southwest Region About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Pipelines in the Southwest Region Overview | Export Transportation | Intrastate | Connection to Gulf of Mexico | Regional Pipeline Companies & Links Overview Most of the major onshore interstate natural gas pipeline companies (see Table below) operating in the Southwest Region (Arkansas, Louisiana, New Mexico, Oklahoma, and Texas) are primarily exporters of the region's natural gas production to other parts of the country and Mexico, while an extensive Gulf of Mexico and intrastate natural gas pipeline network is the main conduit for deliveries within the region. More than 56,000 miles of natural gas pipeline on more than 66 intrastate natural gas pipeline systems (including offshore-to-onshore and offshore Gulf of Mexico pipelines) deliver natural gas to the region's local natural gas distribution companies and municipalities and to the many large industrial and electric power facilities located in the region.

436

Exploring Pipeline Dynamics to Connect New Markets  

Reports and Publications (EIA)

This presentation provides analytical results of ongoing research at the Natural Gas Division, Office of Oil and Gas, on the role of natural gas pipelines in the marketplace. The presentation also includes the latest market developments for pipeline expansion and new construction.

Information Center

2009-03-06T23:59:59.000Z

437

Changes in the Pipeline Transportation Market  

Reports and Publications (EIA)

This analysis assesses the amount of capacity that may be turned back to pipeline companies, based on shippers' actions over the past several years and the profile of contracts in place as of July 1, 1998. It also examines changes in the characteristics of contracts between shippers and pipeline companies.

Information Center

1999-04-01T23:59:59.000Z

438

Natural Gas Pipeline and System Expansions  

Reports and Publications (EIA)

This special report examines recent expansions tothe North American natural gas pipeline networkand the nature and type of proposed pipeline projects announced or approved for construction during the next several years in the United States. It includes those projects in Canada and Mexico that tie in with U.S. markets or projects.

Information Center

1997-04-01T23:59:59.000Z

439

Algeria LPG pipeline is build by Bechtel  

SciTech Connect

The construction of the 313 mile long, 24 in. LPG pipeline from Hassi R'Mel to Arzew, Algeria is described. The pipeline was designed to deliver 6 million tons of LPG annually using one pumping station. Eventually an additional pumping station will be added to raise the system capacity to 9 million tons annually.

Horner, C.

1984-08-01T23:59:59.000Z

440

Performance Metrics for Embedded Parallel Pipelines  

Science Conference Proceedings (OSTI)

AbstractżA statistical approach to performance prediction is applied to a system development methodology for pipelines comprised of independent parallel stages. The methodology is aimed at distributed memory machines employing medium-grained parallelization. ... Keywords: Performance prediction, parallel pipelines, real-time systems, order statistics.

Martin Fleury; Andrew C. Downton; Adrian F. Clark

2000-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Integrity assurance of natural gas transmission pipelines  

Science Conference Proceedings (OSTI)

Natural gas transmission pipelines have proven to be a safe and efficient means for transporting the trillions of cubic feet of natural gas used annually in the United States. Since the peak of construction of these pipelines occurred between 1950 and the mid-1960s, their average age is now over thirty years. However, replacement of these pipelines because of age would be prohibitively expensive and unnecessary. Preventive maintenance and rehabilitation programs put into practice by the pipeline industry provides the key to ensuring the continued integrity of the transmission pipeline system. This article reviews the preventive maintenance practices commonly used by the gas industry. These practices include right-of-way patrols, corrosion control procedures, in-line inspection with intelligent or smart pigs that inspect the pipe while traveling through the inside of the pipe, direct access inspection of the pipe from bellhole excavations, and hydrostatic retesting of pipelines. When pipelines are properly maintained, these practices can ensure the integrity and long-term serviceability of transmission pipelines well into the 21st Century. 11 refs., 5 figs., 1 tab.

Posakony, G.J. (J-TECH Consulting, Richland, WA (United States))

1993-05-01T23:59:59.000Z

442

Rio Grande pipeline introduces LPG to Mexico  

SciTech Connect

Rio Grande Pipeline, a joint venture between Mid-America Pipeline Co., Amoco Pipeline Co. and Navajo Pipeline Co., has broken new ground in the energy industry as the first LPG pipeline to cross the US-Mexico border. Plans for the project were announced in November 1995 and first deliveries started three months ago on March 21, 1997. The 8-inch, 265-mile pipeline originates near Odessa, TX, where it receives an 85-15 propane-butane mix via a connection to Mid-America Pipeline. From Odessa, product moves west through the Texas desert and crosses the Rio Grande River about 15 miles south of El Paso near Clint, TX and extends 20 miles into Mexico. Capacity of the line is 24,000 bpd and it has been averaging about 22,000 bpd since line-fill. All in all, it sounded like a reasonably feasible, routine project. But perceptions can be deceiving, or at least misleading. In other words, the project can be summarized as follows: one river, two cultures and a world of difference. The official border crossing for pipeline construction took place on Dec. 2, 1996, with a directional drill under the Rio Grande River, but in actuality, the joint venture partners were continually bridging differences in language, laws, customs and norms with Pemex and contracted workers from Mexico.

NONE

1997-06-01T23:59:59.000Z

443

Corrosion cracking of gas-carrying pipelines  

Science Conference Proceedings (OSTI)

Samples of soil and other materials adhering to the outer and inner surfaces of pipeline coatings, and pieces of rupture pipe were studied to investigate causes of gas-carrying pipeline failures in Pakistan. Chemical analysis of the ruptured pipe shows the pipeline steel had no material flaw. X-ray diffraction studies of the soil reveal that it contains clay and nonclay minerals normally found. The material adhering to the coating facing the pipeline surface contains carbonates and bicarbonates of sodium, namely, nahcolite and trona. This study shows that nahcolite and trona, as products of cathodic protection that were then synthesized in the vicinity of the pipeline surface, could have attacked the pipe surface over the years and caused corrosion.

Hussain, K.; Shaukat, A.; Hassan, F.

1989-02-01T23:59:59.000Z

444

OPUS-97: A Generalized Operational Pipeline System  

E-Print Network (OSTI)

. OPUS is the platform on which the telemetry pipeline at the Hubble Space Telescope Science Institute is running currently. OPUS was developed both to repair the mistakes of the past, and to build a system which could meet the challenges of the future. The production pipeline inherited at the Space Telescope Science Institute was designed a decade earlier, and made assumptions about the environment which were unsustainable. While OPUS was developed in an environment that required a great deal of attention to throughput, speed, e#ciency, flexibility, robustness and extensibility, it is not just a "big science" machine. The OPUS platform, our baseline product, is a small compact system designed to solve a specific problem in a robust way. The OPUS platform handles communication with the OPUS blackboard; individual processes within this pipeline need have no knowledge of OPUS, of the blackboard, or of the pipeline itself. The OPUS API is an intermediate pipeline product. In addition to t...

J. Rose

1998-01-01T23:59:59.000Z

445

Key decisions near for Chad pipeline proposal  

Science Conference Proceedings (OSTI)

The World Bank is expected to play a key role in a proposed $3 billion development of oil fields in Chad and an export pipeline through Cameroon to the Atlantic Ocean. The project, which has been at least 4 years in the making, could see a breakthrough later this year. Esso Exploration and production Chad Inc. is operator for the consortium proposing the project. It holds a 40% interest, Ste. Shell Tchadienne de Recherches et d`Exploitation has 40%, and Elf Hydrocarbures Tchad has a 20% share it purchased from Chevron Corp. in 1993 (OGJ, February 1, 1993, p 25). The governments of Chad and Cameroon, which had approved a framework agreement for the pipeline in 1995, now are studying an assessment of the pipeline`s environmental impact. If they approve the plans, they are expected to apply to the World Bank for financing. The paper describes the Chad fields, the export pipeline, background information, and the Banks role.

Crow, P.

1997-05-12T23:59:59.000Z

446

IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers  

E-Print Network (OSTI)

lists the treatment methods and the percentage of utilitieslists the characteristics of the water sources used by utilities

Brown, Moya Melody, Camilla Dunham Whitehead, Rich

2011-01-01T23:59:59.000Z

447

AN EVALUATION OF PYROLYSIS OIL PROPERTIES AND CHEMISTRY AS RELATED TO PROCESS AND UPGRADE CONDITIONS WITH SPECIAL CONSIDERATION TO PIPELINE SHIPMENT  

DOE Green Energy (OSTI)

One factor limiting the development of commercial biomass pyrolysis is challenges related to the transportation of the produced pyrolysis oil. The oil has different chemical and physical properties than crude oil, including more water and oxygen and has lower H/C ratio, higher specific gravity and density, higher acidity, and lower energy content. These differences could limit its ability to be transported by existing petroleum pipelines. Pyrolysis oil can also be treated, normally by catalytic hydrodeoxygenation, and approaches crude oil and petroleum condensates at higher severity levels. This improvement also results in lower liquid yield and high hydrogen consumption. Biomass resources for pyrolysis are expected to become plentiful and widely distributed in the future, mainly through the use of crop residuals and growing of energy crops such as perennial grasses, annual grasses, and woody crops. Crude oil pipelines are less well distributed and, when evaluated on a county level, could access about 18% of the total biomass supply. States with high potential include Texas, Oklahoma, California, and Louisiana. In this study, published data on pyrolysis oil was compiled into a data set along with bio-source source material, pyrolysis reactor conditions, and upgrading conditions for comparison to typical crude oils. Data of this type is expected to be useful in understanding the properties and chemistry and shipment of pyrolysis oil to refineries, where it can be further processed to fuel or used as a source of process heat.

Bunting, Bruce G [ORNL; Boyd, Alison C [ORNL

2012-01-01T23:59:59.000Z

448

The LOFAR Known Pulsar Data Pipeline  

E-Print Network (OSTI)

Transient radio phenomena and pulsars are one of six LOFAR Key Science Projects (KSPs). As part of the Transients KSP, the Pulsar Working Group (PWG) has been developing the LOFAR Pulsar Data Pipelines to both study known pulsars as well as search for new ones. The pipelines are being developed for the Blue Gene/P (BG/P) supercomputer and a large Linux cluster in order to utilize enormous amounts of computational capabilities (50Tflops) to process data streams of up to 23TB/hour. The LOFAR pipeline output will be using the Hierarchical Data Format 5 (HDF5) to efficiently store large amounts of numerical data, and to manage complex data encompassing a variety of data types, across distributed storage and processing architectures. We present the LOFAR Known Pulsar Data Pipeline overview, the pulsar beam-formed data format, the status of the pipeline processing as well as our future plans for developing the LOFAR Pulsar Search Pipeline. These LOFAR pipelines and software tools are being developed as the next gen...

Alexov, A; Mol, J D; Stappers, B; van Leeuwen, J

2010-01-01T23:59:59.000Z

449

Transportation and Handling of Medium Btu Gas in Pipelines  

Science Conference Proceedings (OSTI)

Coal-derived medium btu gas can be safely transported by pipeline over moderate distances, according to this survey of current industrial pipeline practices. Although pipeline design criteria will be more stringent than for natural gas pipelines, the necessary technology is readily available.

1984-03-01T23:59:59.000Z

450

Pipelining with common operands for power-efficient linear systems  

Science Conference Proceedings (OSTI)

We propose a systematic pipelining method for a linear system to minimize power and maximize throughput, given a constraint on the number of pipeline stages and a set of resource constraints. Unlike most existing pipelining approaches, our method takes ... Keywords: common operand, linear system, operand sharing, pipelining, power

Daehong Kim; Dongwan Shin; Kiyoung Choi

2005-09-01T23:59:59.000Z

451

GTI PROJECT NUMBER 21222 CALIFORNIA NATURAL GAS PIPELINE  

E-Print Network (OSTI)

GTI PROJECT NUMBER 21222 CALIFORNIA NATURAL GAS PIPELINE ASSESSMENT Contract Number: #500 GAS PIPELINE ASSESSMENT #50010050 Legal Notice This information was prepared by Gas Technology;CALIFORNIA NATURAL GAS PIPELINE ASSESSMENT #50010050 Task 3Summary Report AssessmentofCurrentlyAvailablePipeline

452

Evaluation of Natural Gas Pipeline Materials and Infrastructure for  

E-Print Network (OSTI)

Evaluation of Natural Gas Pipeline Materials and Infrastructure for Hydrogen/Mixed Gas Service Retrofitting Existing NG Pipelines fro Hydrogen/Hythane Service New Pipeline Installation and ROW Lower South Carolina Electric and Gas University of South Carolina Praxair Hydrogen Pipeline Working Group

453

GTI PROJECT NUMBER 21222 CALIFORNIA NATURAL GAS PIPELINE  

E-Print Network (OSTI)

GTI PROJECT NUMBER 21222 CALIFORNIA NATURAL GAS PIPELINE ASSESSMENT Contract Number: #500 GAS PIPELINE ASSESSMENT #500-10-050 Legal Notice This information was prepared by Gas Technology;CALIFORNIA NATURAL GAS PIPELINE ASSESSMENT #500-10-050 Baseline Technology Assessment for Pipeline Integrity

454

Measuring and moderating the water resource impact of biofuel production and trade  

E-Print Network (OSTI)

on   development  of  biomass  supply  systems  as  a  new  Future  biomass  energy  supply:  The  consumptive  water  

Fingerman, Kevin Robert

2012-01-01T23:59:59.000Z

455

Pipeline response to nearby detonations  

SciTech Connect

Texas Gas Transmission Corp. has supplemented the findings of Southwest Research Institute's study of detonation-induced stresses on pipelines by applying SwRI's equations to actual field problems. Texas Gas used the blasting-stress equations to fix the minimum allowable stand-off distance and maximum particle velocities for strip-mining operations planned along a transmission line right-of-way. The ultimate goal was to ensure that the combined stresses of blasting and operating pressures would not exceed 72% of the pipe's specified minimum yield strength. These stress calculations enabled Texas Gas to maintain normal operating conditions throughout the time that overburden blasting was taking place 100-500 ft from the line.

Bart, G.J.

1979-01-01T23:59:59.000Z

456

Pipeline Carriers (Montana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carriers (Montana) Carriers (Montana) Pipeline Carriers (Montana) < Back Eligibility Utility Investor-Owned Utility Industrial Construction Municipal/Public Utility Rural Electric Cooperative Retail Supplier Institutional Systems Integrator Fuel Distributor Program Info State Montana Program Type Siting and Permitting Provider State of Montana Public Service Commission Pipeline carriers transporting crude petroleum, coal, the products of crude petroleum or coal, or carbon dioxide produced in the combustion or gasification of fossil fuels are required to abide by these regulations. The regulations address construction permits and the use of eminent domain by pipeline carriers, records and reporting, connection and interchange facilities, and the prohibition of discrimination in rates and service

457

Reflex: Scientific Workflows for the ESO Pipelines  

E-Print Network (OSTI)

The recently released Reflex scientific workflow environment supports the interactive execution of ESO VLT data reduction pipelines. Reflex is based upon the Kepler workflow engine, and provides components for organising the data, executing pipeline recipes based on the ESO Common Pipeline Library, invoking Python scripts, and constructing interaction loops. Reflex will greatly enhance the quick validation and reduction of the scientific data. In this paper we summarize the main features of Reflex, and demonstrate as an example its application to the reduction of echelle UVES data.

Ballester, Pascal; Forchi, Vincenzo; Freudling, Wolfram; Garcia-Dabo, Cesar Enrique; Gebbinck, Maurice klein; Modigliani, Andrea; Romaniello, Martino

2011-01-01T23:59:59.000Z

458

Policies of System Level Pipeline Modeling  

E-Print Network (OSTI)

Pipelining is a well understood and often used implementation technique for increasing the performance of a hardware system. We develop several SystemC/C++ modeling techniques that allow us to quickly model, simulate, and evaluate pipelines. We employ a small domain specific language (DSL) based on resource usage patterns that automates the drudgery of boilerplate code needed to configure connectivity in simulation models. The DSL is embedded directly in the host modeling language SystemC/C++. Additionally we develop several techniques for parameterizing a pipeline's behavior based on policies of function, communication, and timing (performance modeling).

Harcourt, Ed

2008-01-01T23:59:59.000Z

459

MFL tool hardware for pipeline inspection  

SciTech Connect

The intelligent pig based on the magnetic flux leakage (MFL) is frequently used for inline inspection of gas and liquid transportation pipelines. The tool is capable of reliably detecting and characterizing several commonly occurring pipeline defects including metal loss due to corrosion and gouges, dents, and buckles, which tend to threaten the structural integrity of the pipeline. The defect detection and characterization capabilities of the tool are directly dependent upon the type of critical hardware components and systems selected for the tool assembly. This article discusses the key components of an advanced or high resolution MFL tool.

Tandon, K.K. [Engineers India Ltd., Haryana (India). Research and Development Complex

1997-02-01T23:59:59.000Z

460

Offshore pipeline design utilizing a PLEM  

SciTech Connect

A unique pipeline end module (PLEM) functioning as an intermediate underwater tie-in point is planned for use in the Gulf of Thailand to permit new connections without disruption of flow. In March 1983, the Petroleum Authority of Thailand (PTT) contracted with PLT Engineering Inc. to do the preliminary design for a 43-km, 24-in. gas pipeline from Union Oil's newly developed Platong field in the Gulf of Thailand. The assigned task was to tie the new pipeline into an existing 34-in. trunkline that carries gas from Erawan field to shore at Sattahip, Thailand.

Karpathy, S.A.

1984-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers  

E-Print Network (OSTI)

rural businesses, for instance for energy audits. In FY2010,Business_Programs/ind ustriallighting_bestpracticessheet.pdf. Water & Wastewater Treatment Energy Use Self-Audit

Brown, Moya Melody, Camilla Dunham Whitehead, Rich

2011-01-01T23:59:59.000Z

462

IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers  

E-Print Network (OSTI)

EPRI. 1997. Quality Energy Efficiency Retrofits for WaterIndustry. Office of Energy Efficiency and Renewable Energy,Finding Money for Your Energy Efficiency Projects. (A Primer

Brown, Moya Melody, Camilla Dunham Whitehead, Rich

2011-01-01T23:59:59.000Z

463

The Prospects for Social Business in Peri-Urban Water Supply: Employment and Household Welfare Impacts of the Grameen Veolia Venture  

E-Print Network (OSTI)

such as pipes, spigots and jars. Masons are essential toselling water delivered in jars. These alterations to thethe program launched a jar business in peri-urban centers

Pierce, Gregory

2013-01-01T23:59:59.000Z

464

IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers  

SciTech Connect

As American drinking water agencies face higher production costs, demand, and energy prices, they seek opportunities to reduce costs without negatively affecting the quality of the water they deliver. This guide describes resources for cost-effectively improving the energy efficiency of U.S. public drinking water facilities. The guide (1) describes areas of opportunity for improving energy efficiency in drinking water facilities; (2) provides detailed descriptions of resources to consult for each area of opportunity; (3) offers supplementary suggestions and information for the area; and (4) presents illustrative case studies, including analysis of cost-effectiveness.

Brown, Moya Melody, Camilla Dunham Whitehead, Rich; Dunham Whitehead, Camilla; Brown, Rich

2010-09-30T23:59:59.000Z

465

Relationships between {sup 222}Rn dissolved in ground water supplies and indoor {sup 222}Rn concentrations in some Colorado front range houses  

SciTech Connect

Indoor {sup 222}Rn concentrations were measured in 37 houses with alpha track detectors placed in water-use rooms near water sources (bathrooms, laundry rooms, and kitchens) and in non-water-use living rooms, dining rooms, and bedrooms away from water sources. Results show that relative contributions of {sup 222}Rn to indoor air from water use are insignificant when soil-gas concentrations are high but become increasingly important as the ratio of {sup 222}Rn-in-water:{sup 222}Rn-in-soil gas increases. High soil-gas {sup 222}Rn concentrations may mask {sup 222}Rn contributions from water even when waterborne {sup 222}Rn concentrations are as high as 750 kBq m{sup {minus}3}. Ground water in Precambrian Pikes Peak granite averages 340 kBq m{sup {minus}3} {sup 222}Rn, vs. 170 kBq m{sup {minus}3} in Precambrian migmatite, but average {sup 222}Rn concentrations in soil gas are also lower in migmatite. Because the ratio of {sup 222}Rn-in-water:{sup 222}Rn-in-soil gas may be consistently higher for houses in migmatite than in Pikes Peak granite, indoor air in houses built on migmatite have a greater relative contribution from water use even though average {sup 222}Rn concentrations in the water are lower. Continuous monitoring of {sup 222}Rn concentrations in air on 15-min intervals also indicates that additions to indoor concentrations from water use are significant and measurable only when soil-gas concentrations are low and concentrations in water are high. When soil-gas concentrations were mitigated to less than 150 Bq m{sup {minus}3} in one house, water contributed 20-40% of the annual indoor {sup 222}Rn concentration in the laundry room ({sup 222}Rn concentration in water of 670 kBq m{sup {minus}3}). Conversely, when the mitigation system is inactive, diurnal fluctuations and other variations in the soil-gas {sup 222}Rn contribution swamp the variability due to water use in the house. 9 refs., 8 figs., 8 tabs.

Folger, P.F. [Geological Survey, Denver, CO (United States)]|[Colorado School of Mines, Golden, CO (United States); Wanty, R.B. [Geological Survey, Denver, CO (United States); Poeter, E. [Colorado School of Mines, Golden, CO (United States); Nyberg, P. [Environmental Protection Agency, Denver, CO (United States)

1994-09-01T23:59:59.000Z

466

IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers  

E-Print Network (OSTI)

31, 2010. ) U.S. DOE Energy Efficiency & Renewable Energy (3, 2010. ) Northwest Energy Efficiency Alliance, ElectricEPRI. 1997. Quality Energy Efficiency Retrofits for Water

Brown, Moya Melody, Camilla Dunham Whitehead, Rich

2011-01-01T23:59:59.000Z

467

EIA - Natural Gas Pipeline Network - U.S. Natural Gas Pipeline ...  

U.S. Energy Information Administration (EIA)

U.S. Natural Gas Pipeline Network, 2009 The EIA has determined that the informational map displays here do not raise security concerns, based on the application of ...

468

Petroleum Supply Monthly  

U.S. Energy Information Administration (EIA) Indexed Site

Table 12. PAD District 2 - Year-to-Date Daily Average Supply and Disposition of Crude Oil and Petroleum Products, January-May 2013 (Thousand Barrels per Day) Commodity Supply...

469

Petroleum Supply Monthly  

U.S. Energy Information Administration (EIA)

Energy Information Administration/Petroleum Supply Monthly, October 2011 11 Table 4. U.S. Year-to-Date Daily Average Supply and Disposition of Crude Oil and Petroleum ...

470

Caspian Region Oil Pipelines (U) KIEV RUSSIA  

U.S. Energy Information Administration (EIA)

Kashagan Tengiz Azeri Chirag Guneshli Deep Neka-Tehran 50,000 b/d (first stage) Atyrau-Samara 300,000 b/d Karachaganak-Atyrau (planned) 180,000 b/d Caspian Pipeline

471

Communication systems vital to Colombian pipeline  

Science Conference Proceedings (OSTI)

Construction of the Centro Oriente Gas Pipeline represents a major step in Colombia`s goal to strengthen the emerging natural gas business. With construction beginning in 1995, the Centro Oriente is scheduled to begin operation early this year transporting 150 MMcf/d. The 779-kilometer (484-mile) pipeline ranging in diameter from 22-inch to 12-inches, provides the central transportation link between major gas suppliers in both the northern and western regions of Colombia and new markets throughout their immediate regions as well as in the central and eastern regions. TransCanada, operating company for the Centro Oriente pipeline, will develop and manage the support organizations required to operate and maintain the system. The central control system for the CPC is the Gas SCADA system, ADACS, provided by Bristol Babcock Inc. (BBI). This control system provides the data acquisition and control capabilities necessary to operate the entire pipeline safely and efficiently from Burcaramanga.

Serrato, E. [Ecopetrol, Bogota (Colombia); Mailloux, R. [Bristol Babcock Inc., Watertown, CT (United States)

1997-02-01T23:59:59.000Z

472

Construction advances on gas pipeline in Germany  

Science Conference Proceedings (OSTI)

This paper reports that construction is well under way on a pipeline to transport gas form the North Sea and Russia into the heart of Germany. Mitte Deutchland Anbindungs Leitung (Midal) gas pipeline, under construction for Winershall AG and partner Gazprom, the Russian state gas company, will extend more than 640 km from the North Sea coast to Ludwigshafen in Southwest Germany. en route, the line will make more than 100 river crossings. Midal will connect with the joint ventures' Sachesen-Thurigen-Erdgas Leitung (Stegal) pipeline, which moves Russian gas into eastern Germany and Wintershall's gas storage site at Rehden. Wintershall Erdgas Handelshaus GmbH, set up to manage the joint venture project, divided the pipeline route into six parts, hiring different contractors to lay each section.

Not Available

1992-09-28T23:59:59.000Z

473

Weld Simulation in X100 Pipeline Steel  

Science Conference Proceedings (OSTI)

Abstract Scope, The effect of gas metal arc weld (GMAW) parameters on the coarse-grain heat-affect zone (CGHAZ) of X100 pipeline steel has been studied by ...

474

Gaseous Hydrogen Embrittlement of Pipeline Steels  

Science Conference Proceedings (OSTI)

Abstract Scope, The tensile properties of x52, x65, x80 and x100 pipeline steels have been measured in a high pressure (13.6 MPa), high purity, hydrogen gas ...

475

Biofuel Supply Chain Infrastructure  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Areas Freight Flows Passenger Flows Supply Chain Efficiency Transportation: Energy Environment Safety Security Vehicle Technologies The Infrastructure Challenge of...

476

Computer Systems to Oil Pipeline Transporting  

E-Print Network (OSTI)

Computer systems in the pipeline oil transporting that the greatest amount of data can be gathered, analyzed and acted upon in the shortest amount of time. Most operators now have some form of computer based monitoring system employing either commercially available or custom developed software to run the system. This paper presented the SCADA systems to oil pipeline in concordance to the Romanian environmental reglementations.

Chis, Timur

2009-01-01T23:59:59.000Z

477

Riser, pipelines installed in Griffin field  

Science Conference Proceedings (OSTI)

A mooring riser and flow lines along with a 67-km, 8-in., gas-export pipelines have been installed offshore Australia for BHP Petroleum's Griffin field development. The 66-km gas line will carry Griffin field gas to an onshore gas-processing plant. Completing the projects ahead of schedule was Clough Stena Joint Venture (Asia), Perth. BHP awarded the contracts in early 1993; the project was completed in January this year. The paper describes the contractor, pipeline installation, and handling equipment.

Not Available

1994-05-23T23:59:59.000Z

478

Applications of the Pipeline Environment for Visual Informatics and Genomics Computations  

E-Print Network (OSTI)

et al. : Applications of the pipeline environment for visualusing the LONI pipeline. Frontiers in Neuroinformatics 2010,Access Applications of the pipeline environment for visual

2011-01-01T23:59:59.000Z

479

GenePRIMP: A GENE PRediction IMprovement Pipeline for Prokaryotic genomes  

E-Print Network (OSTI)

PRediction IMprovement Pipeline for Amrita Pati 1 , NataliaGene Prediction IMprovement Pipeline, http://geneprimp.jgi-based post-processing pipeline that identifies erroneously

Pati, Amrita

2012-01-01T23:59:59.000Z

480

Pipelines, Pathways, and Payoffs: Economic Challenges and Returns to Changing Demographics in California  

E-Print Network (OSTI)

on Multiple Pathways Pipelines, Pathways, and Payoffs:Jon Stiles & Henry Brady Pipelines, Pathways, and Payoffs:of the educational pipeline to describe how students

Stiles, Jon; Brady, Henry

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "water supply pipeline" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Stuck in the Pipeline: A Critical Review of STEM Workforce Literature  

E-Print Network (OSTI)

and science careers: Leaky pipeline or gender filter? GenderL. (2006). Expanding the pipeline: Transforming the cultureThe incredible shrinking pipeline. Inroads: SIGCE Bulletin,

Metcalf, Heather

2010-01-01T23:59:59.000Z

482

BS-Seeker2: a versatile aligning pipeline for bisulfite sequencing data  

E-Print Network (OSTI)

RL: MethylCoder: software pipeline for bisulfite-treateda versatile aligning pipeline for bisulfite sequencing dataof BS Seeker, as a full pipeline for mapping bisulfite

2013-01-01T23:59:59.000Z

483

Rnnotator: an automated de novo transcriptome assembly pipeline from stranded RNA-Seq reads  

E-Print Network (OSTI)

transcriptome assembly pipeline from stranded RNA-Seq readsRnnotator assembly pipeline. Figure 2. Read dereplicationan automated software pipeline that generates transcript

Martin, Jeffrey

2011-01-01T23:59:59.000Z

484

Pipeline Access and Market Integration in the Natural Gas Industry: Evidence from Cointegration Tests  

E-Print Network (OSTI)

System for Natural Gas Pipelines." Study prepared underin the Natural Gas Pipeline Industry. Ph.D. dissertation,the remaining barfers to pipeline integration. REFERENCES

De Vany, Arthur; Walls, W. David

1993-01-01T23:59:59.000Z

485

Publicly Submitted White Papers - Water  

Science Conference Proceedings (OSTI)

*. Bookmark and Share. Water. Advanced ... Strategies; AQUEOUS PHASE MERCURY REMOVAL: Strategies for a Secure Future Water Supply; ...

2012-08-01T23:59:59.000Z

486

A MathCAD procedure for commercial pipeline hydraulic design considering local energy losses  

Science Conference Proceedings (OSTI)

Using a power type equation for friction factor, this paper presents a design procedure which provides accurate solutions for three types of pipe design problems (Types A-C) taking into consideration the effect of local losses. The parameters introduced ... Keywords: Commercial pipes, MathCAD, Pipe hydraulics, Pipeline design, Pressurized flows, Software, Steady-state analysis, Water distribution networks

Gürol Y?ld?r?m; Vijay P. Singh

2010-03-01T23:59:59.000Z

487

Expansion of the U.S. Natural Gas Pipeline Network:  

Gasoline and Diesel Fuel Update (EIA)

Expansion of the U.S. Natural Gas Pipeline Network: Expansion of the U.S. Natural Gas Pipeline Network: Additions in 2008 and Projects through 2011 This report examines new natural gas pipeline capacity added to the U.S. natural gas pipeline system during 2008. In addition, it discusses and analyzes proposed natural gas pipeline projects that may be developed between 2009 and 2011, and the market factors supporting these initiatives. Questions or comments on this article should be directed to Damien Gaul at damien.gaul@eia.doe.gov or (202) 586-2073. Robust construction of natural gas infrastructure in 2008 resulted in the completion of 84 pipeline projects in the lower 48 States, adding close to 4,000 miles of natural gas pipeline. These completions of new natural gas pipelines and expansions of existing pipelines in the United States

488

A Low-Power 9-bit Pipelined CMOS ADC with Amplifier and Comparator Sharing Technique  

E-Print Network (OSTI)

This paper describes a pipelined analog-to-digital converter (ADC) employing a power and area efficient architecture. The adjacent stages of a pipeline share operational amplifiers. In order to keep accuracy of the amplifiers in the first stages, they use a partially sharing technique. The feature of the proposed scheme is that it also shares the comparators. The capacitors of the first stages of a pipeline are scaled down along a pipeline for a further reducing the chip area and its power consumption. A 9-bit 20-MSamples/s ADC, intended for use in multi-channel mixed-signal chips, has been fabricated via Europractice in a 180-nm CMOS process from UMC. The prototype ADC shows a spurious-free dynamic range of 58.5 dB at a sample rate of 20 MSamples/s, when a 400 kHz input signal with a swing of 1 dB below full scale is applied. The effective number of bits is 8.0 at the same conditions. ADC occupies an active area of 0.4 mm2 and dissipates 8.6 mW at a 1.8 V supply.

Bocharov, Yuri; Osipov, Dmitry

2012-01-01T23:59:59.000Z

489

Runtime Assignment of Reconfigurable Hardware Components for Image Processing Pipelines  

E-Print Network (OSTI)

The combination of hardware acceleration and flexibility make FPGAs important to image processing applications. There is also a need for efficient, flexible hardware/software codesign environments that can balance the benefits and costs of using FPGAs. Image processing applications often consist of a pipeline of components where each component applies a different processing algorithm. Components can be implemented for FPGAs or software. Such systems enable an image analyst to work with either FPGA or software implementations of image processing algorithms for a given problem. The pipeline assignment problem chooses from alternative implementations of pipeline components to yield the fastest pipeline. Our codesign system solves the pipeline assignment problem to provide the most effective implementation automatically, so the image analyst can focus solely on choosing components which make up the pipeline. However, the pipeline assignment problem is NP complete. An efficient, dynamic solution to the pipeline assignment problem is a desirable enabler of codesign systems which use both FPGA and software implementations. This paper is concerned with solving pipeline assignment in this context. Consequently, we focus on optimal and heuristic methods for fast (fixed time limit) runtime pipeline assignment. Exhaustive search, integer linear programming and local search methods for pipeline assignment are investigated. We present experimental findings for pipelines of 20 or fewer components which show that in our environment, optimal runtime solutions are possible for smaller pipelines and nearly optimal heuristic solutions are possible for larger pipelines.

Heather Quinn; L. A. Smith King; Miriam Leeser; W. Meleis; Waleed Meleis

2003-01-01T23:59:59.000Z

490

Field tests of probes for detecting internal corrosion of natural gas transmission pipelines  

Science Conference Proceedings (OSTI)

A field study was conducted to evaluate the use of electrochemical corrosion rate (ECR) probes for detecting corrosion in environments similar to those found in natural gas transmission pipelines. Results and interpretation will be reported from four different field tests. Flange and flush-mount probes were used in four different environments at a gas-gathering site and one environment but two different orientations at a natural gas plant. These sites were selected to represent normal and upset conditions in a gas transmission pipeline. The environments consisted of 2 different levels of humidified natural gas/organic/water mixtures removed from natural gas, and the environments at the 6 and 12 o'clock positions of a natural gas pipeline carrying 2-phase gas/liquid flow. Data are also presented comparing the ECR probe data to that for coupons used to determine corrosion rate and to detect the presence of microbiologically influenced corrosion (MIC).

Covino, Bernard S., Jr.; Bullard, Sophie J.; Cramer, Stephen D.; Holcomb, Gordon R.; Ziomek-Moroz, M.; Cayard, Michael S. (Intercorr International Inc.); Kane, Russell D. (Intercorr International Inc.); Meidinger, Brian (RMOTC-DOE)

2005-01-01T23:59:59.000Z

491

Surface mine blasting near pressurized transmission pipelines. Report of investigations/1994  

SciTech Connect

The mining industry and regulatory agencies have requested guidance on blasting near buried transmission pipelines and safe vibration levels. The U.S. Bureau of Mines and the State of Indiana cooperated with AMAX Coal Company and its consultants to determine the effects of coal mine overburden blasting on nearby pipelines. Five pressurized 76-m pipeline sections were installed on the Minnehaha Mine highwall near Sullivan, IN for testing to failure. Four 17- to 51-cm diameter welded steel pipes and one 20-cm PVC water pipe were monitored for vibration, strain, and pressure for a period of 6 months while production blasting advanced up to the pipeline field. In contrast to previous studies of small-scale close-in blasting for construction, these tests involved overburden blasts of up to 950 kg per delay in 31-cm blast-holes. Analyses found low responses, strains, and calculated stresses from even large blasts. Ground vibrations of 120-250 mm/s produced worst case strains of about 25 pct of those resulting from pipeline operations and calculated stresses of only about 10-18 pct of the ultimate tensile strength.

Siskind, D.E.; Stagg, M.S.; Wiegand, J.E.; Schulz, D.L.

1994-12-31T23:59:59.000Z

492

EIA - Natural Gas Pipeline Network - Natural Gas Imports/Exports Pipelines  

U.S. Energy Information Administration (EIA) Indexed Site

Pipelines Pipelines About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Import/Export Pipelines As of the close of 2008 the United States has 58 locations where natural gas can be exported or imported. 24 locations are for imports only 18 locations are for exports only 13 locations are for both imports and exports 8 locations are liquefied natural gas (LNG) import facilities Imported natural gas in 2007 represented almost 16 percent of the gas consumed in the United States annually, compared with 11 percent just 12 years ago. Forty-eight natural gas pipelines, representing approximately 28 billion cubic feet (Bcf) per day of capacity, import and export natural gas between the United States and Canada or Mexico.

493

Water pollution  

SciTech Connect

Ballast water, which is sea water that is carried in oil tankers to provide stability, can become contaminated with oil. Alyeska Pipeline Service Company runs a water treatment plant at its pipeline terminal at Prot Valdez, Alaska, to treat ballast water before it is discharged into the sea. GAO reviewed EPA's recently reissued National Pollution Discharge Elimination System permit for the Port Valdez facility. In this report, GAO compares the effluent limits and other requirements under the reissued permit with those of the old permit, determines the reasons for changes in the reissued permit, and examines Alyeska's initial efforts to comply with the reissued permit's effluent limits and reporting requirements.

1990-06-01T23:59:59.000Z

494

The pipeline OQ Rule: Perspectives, options, and implementation  

Science Conference Proceedings (OSTI)

The US Department of Transportation (DOT) Pipeline Safety: Qualification of Pipeline Personnel Rule, commonly termed the Operator Qualification (OQ) Rule, became law on October 26, 1999. The rule requires operators to develop a qualification program for pipeline personnel. Personnel must demonstrate proficiency and be able to react to abnormal operating conditions. the intent is to reduce pipeline incidents caused by human error by ensuring that pipeline personnel are qualified. This paper describes different perspectives on the need for the rule, constraints to its implementation, and options and resources available to pipeline operators.

Lewis, B.

2000-04-01T23:59:59.000Z

495

Water resources planning under climate change and variability  

E-Print Network (OSTI)

Scenario to Climatic Changes. Water Resources Management 19:2006) Quantifying the Urban Water Supply Impacts of Climateto the Shape of Supply? Water Demand Under Heterogeneous

O'Hara, Jeffrey Keith

2007-01-01T23:59:59.000Z

496

Pipeline gas trade between Asian Russia, Northeast Asia gets fresh look  

Science Conference Proceedings (OSTI)

Pipeline trade in natural gas between Asian Russia and Northeast Asia is receiving serious attention from the governments and companies central to the projects that might evolve. Such trade has become possible during the past 5 years because of improvements in relations between China and Russia. Prospects for a long-distance pipeline are enhanced by the possibility of extending deliveries of Russian gas to Korea and Japan to supplement imports by those countries of liquefied natural gas. Korea and Japan have expressed interest in participating in a Russia-China pipeline. But their approaches differ greatly and would require careful coordination. Furthermore, participation by western companies would be essential. A 2 year study by the Royal Institute of International Affairs examined Japanese and Korean views about energy needs and possible sources of supply. The study included a survey of 32 energy organizations in those countries. This article reviews the gas potential of Asian Russia, describes events that have brought attention to those resources as a possible source of supply to Northeast Asia, and summarizes findings of the survey.

Paik, K.W. [Royal Inst. of International Affairs, London (United Kingdom); Choi, J.Y. [University College, London (United Kingdom)

1997-08-18T23:59:59.000Z

497

Pipeline Access and Market Integration in the Natural Gas Industry: Evidence from Cointegration Tests  

E-Print Network (OSTI)

NattmdGas Pipeline of America(NGPL) Northern Natural GasNatural Gas Pipeline of America (NGPL) Teanease~Gas PipelineGas Pipeline of America(NGPL) Northern Natural Gas (NOR’H-I)

De Vany, Arthur; Walls, W. David

1993-01-01T23:59:59.000Z

498

Supply Curves of Conserved Energy  

SciTech Connect

Supply curves of conserved energy provide an accounting framework that expresses the potential for energy conservation. The economic worthiness of a conservation measure is expressed in terms of the cost of conserved energy, and a measure is considered economical when the cost of conserved energy is less than the price of the energy it replaces. A supply curve of conserved energy is independent of energy prices; however, the economical reserves of conserved energy will depend on energy prices. Double-counting of energy savings and error propagation are common problems when estimating conservation potentials, but supply curves minimize these difficulties and make their consequences predictable. The sensitivity of the cost of conserved energy is examined, as are variations in the optimal investment strategy in response to changes in inputs. Guidelines are presented for predicting the consequences of such changes. The conservation supply curve concept can be applied to peak power, water, pollution, and other markets where consumers demand a service rather than a particular good.

Meier, Alan Kevin

1982-05-01T23:59:59.000Z

499

Thai gas demand seen outstripping supply  

SciTech Connect

Thailand's demand for gas will outstrip supplies in the late 1990s as rapid economic growth continues. Gas will be a cornerstone for Thai energy policy throughout the growth, although sources in neighboring countries need development. Thai gas production will rise 25% from 1992 to average 1 bcfd by 1995. Including production from new discoveries, production could rise to 1.5 bcfd by 2000, up almost 90% from the 1992 level. Increased gas flow output in the mid-1990s will be due largely to development of Gulf of Thailand fields. By 1998, production from Gulf of Thailand fields will not be enough to offset the decline in today's fields. Thailand will need to import more than 1 bcfd by 2005 in the absence of future discoveries in the country. The paper discusses new pipelines and imports.

1993-05-03T23:59:59.000Z

500

Supply | OpenEI  

Open Energy Info (EERE)

Supply Supply Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 11, and contains only the reference case. The dataset uses million barrels per day. The data is broken down into crude oil, other petroleum supply, other non petroleum supply and liquid fuel consumption. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO disposition EIA liquid fuels Supply Data application/vnd.ms-excel icon AEO2011: Liquid Fuels Supply and Disposition- Reference Case (xls, 117 KiB) Quality Metrics Level of Review Peer Reviewed Comment Temporal and Spatial Coverage Frequency Annually Time Period 2008-2035 License