Sample records for water discharge permits

  1. Storm Water Discharge Permits (Wisconsin)

    Broader source: Energy.gov [DOE]

    Wisconsin's storm water runoff regulations include permitting requirements for construction sites and industrial facilities, including those processing or extracting coal or gas. The purpose of the...

  2. State Surface Water Discharge Permits (New Hampshire)

    Broader source: Energy.gov [DOE]

    Rules apply to the discharge of all pollutants from a point source to surface waters of the state. The rule does not apply to facilities that require both a state discharge permit and a federal...

  3. Wastewater Regulations for National Pollutant Discharge Elimination System (NPDES) Permits, Underground Injection Control (UIC) Permits, State Permits, Water Quality Based Effluent Limitations and Water Quality Certification (Mississippi)

    Broader source: Energy.gov [DOE]

    The Wastewater Regulations for National Pollutant Discharge Elimination System (NPDES) Permits, Underground Injection Control (UIC) Permits, State Permits, Water Quality Based Effluent Limitations...

  4. State waste discharge permit application for cooling water and condensate discharges

    SciTech Connect (OSTI)

    Haggard, R.D.

    1996-08-12T23:59:59.000Z

    The following presents the Categorical State Waste Discharge Permit (SWDP) Application for the Cooling Water and Condensate Discharges on the Hanford Site. This application is intended to cover existing cooling water and condensate discharges as well as similar future discharges meeting the criteria set forth in this document.

  5. Direct Discharge Permit (Vermont)

    Broader source: Energy.gov [DOE]

    A direct discharge permit is required if a project involves the discharge of pollutants to state waters. For generation purposes, this involves the withdrawal of surface water for cooling purposes...

  6. General Conditions Applicable to Water Discharge Permits and Procedures and Criteria for Issuing Water Discharge Permits (Connecticut)

    Broader source: Energy.gov [DOE]

    These regulations describe permit and facility requirements for facilities which discharge wastewater. Facility construction, expansion, alteration, production increases, or process modifications...

  7. Water Permits (Louisiana)

    Broader source: Energy.gov [DOE]

    The Water Permits Division authorizes permits administered under the Water Quality Regulations. Louisiana's Water Quality Regulations require permits for the discharge of pollutants from any point...

  8. ANNUAL REPORT General Permit for the Discharger of Storm Water from Small Municipal Separate

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    . These activities and structural improvements are referred to as Best Management Practices (BMPs). BMPs9/14/11 1 ANNUAL REPORT General Permit for the Discharger of Storm Water from Small Municipal. Permittee (Agency Name): University of California Santa Cruz 2. Contact Person: _Courtney Trask, Storm Water

  9. ANNUAL REPORT General Permit for the Discharger of Storm Water from Small Municipal Separate

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    . These activities and structural improvements are referred to as Best Management Practices (BMPs). BMPs9/14/10 1 ANNUAL REPORT General Permit for the Discharger of Storm Water from Small Municipal. Permittee (Agency Name): University of California Santa Cruz 2. Contact Person: _Courtney Trask, Storm Water

  10. ANNUAL REPORT General Permit for the Discharger of Storm Water from Small Municipal Separate

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    , 2013 to June 30, 2014 (Year 5) The University of California at Santa Cruz's Storm Water Management improvements are referred to as Best Management Practices (BMPs). BMPs will be updated as appropriate1 ANNUAL REPORT General Permit for the Discharger of Storm Water from Small Municipal Separate

  11. Industrial Discharge Permits (District of Columbia)

    Broader source: Energy.gov [DOE]

    All businesses and government agencies discharging process wastewater to the public sewer system must report their activities to DC Water's Pretreatment Center. Wastewater discharge permits are...

  12. State waste discharge permit application 400 Area secondary cooling water. Revision 2

    SciTech Connect (OSTI)

    NONE

    1996-01-01T23:59:59.000Z

    This document constitutes the Washington Administrative Code 173-216 State Waste Discharge Permit Application that serves as interim compliance as required by Consent Order DE 91NM-177, for the 400 Area Secondary Cooling Water stream. As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site that affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 of the Washington Administrative Code, the State Waste Discharge Permitting Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order DE 91NM-177. The Consent Order DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. Based upon compositional and flow rate characteristics, liquid effluent streams on the Hanford Site have been categorized into Phase 1, Phase 2, and Miscellaneous streams. This document only addresses the 400 Area Secondary Cooling Water stream, which has been identified as a Phase 2 stream. The 400 Area Secondary Cooling Water stream includes contribution streams from the Fuels and Materials Examination Facility, the Maintenance and Storage Facility, the 481-A pump house, and the Fast Flux Test Facility.

  13. Water Pollution Control Permit Regulations (Vermont)

    Broader source: Energy.gov [DOE]

    These regulations outline the permits and permitting processes for point discharges to surface waters and outline the monitoring and reporting requirements.

  14. Water pollution Control Permit Fee Schedules (West Virginia)

    Broader source: Energy.gov [DOE]

    This rule establishes schedules of permit application fees and annual permit fees for state water pollution control permits and national pollutant discharge elimination system permits issued by the...

  15. Groundwater Discharge Permit and Registration (New Hampshire)

    Broader source: Energy.gov [DOE]

    The Groundwater Discharge Permitting and Registration Program seeks to protect groundwater quality by establishing standards, criteria, and procedures for wastewater discharges. The program...

  16. Permit Program Regulating Discharge of Nondomestic Wastewater into a POTW (Ohio)

    Broader source: Energy.gov [DOE]

    Any significant industrial user is required to apply for and obtain an individual indirect discharge permit if they discharge water or waste into a publicly owned treatment works.

  17. State Waste Discharge Permit application: 400 Area Septic System

    SciTech Connect (OSTI)

    Not Available

    1994-06-01T23:59:59.000Z

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affects groundwater or has the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 400 Area Septic System. The influent to the system is domestic waste water. Although the 400 Area Septic System is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. Therefore, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used.

  18. State Waste Discharge Permit application: 200-E Powerhouse Ash Pit

    SciTech Connect (OSTI)

    Atencio, B.P.

    1994-06-01T23:59:59.000Z

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department and Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-E Powerhouse Ash Pit. The 200-E Powerhouse Ash Waste Water discharges to the 200-E Powerhouse Ash Pit via dedicated pipelines. The 200-E Ash Waste Water is the only discharge to the 200-E Powerhouse Ash Pit. The 200-E Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  19. State Waste Discharge Permit application: 200-W Powerhouse Ash Pit

    SciTech Connect (OSTI)

    Atencio, B.P.

    1994-06-01T23:59:59.000Z

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations; the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-W Powerhouse Ash Pit. The 200-W Powerhouse Ash Waste Water discharges to the 200-W Powerhouse Ash Pit via dedicated pipelines. The 200-W Powerhouse Ash Waste Water is the only discharge to the 200-W Powerhouse Ash Pit. The 200-W Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  20. Water Use Permitting (Wisconsin)

    Broader source: Energy.gov [DOE]

    Withdrawers in the Great Lakes Basin who withdraw water in quantities that average 100,000 gallons per day or more in any 30-day period are required to get a water use permit. Two types of water...

  1. Storm Water Individual Permit.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    information meeting to discuss the biannual update on the NPDES Storm Water Individual Permit. Wednesday, January 22, 2014 5:30 p.m. Cities of Gold Conference Center 10 Cities of...

  2. State waste discharge permit application, 200-E chemical drain field

    SciTech Connect (OSTI)

    Not Available

    1994-06-01T23:59:59.000Z

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.

  3. State Waste Discharge Permit application, 183-N Backwash Discharge Pond

    SciTech Connect (OSTI)

    Not Available

    1994-06-01T23:59:59.000Z

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE91NM-177 requires a series of permitting activities for liquid effluent discharges. Liquid effluents on the Hanford Site have been classified as Phase I, Phase II, and Miscellaneous Streams. The Consent Order No. DE91NM-177 establishes milestones for State Waste Discharge Permit application submittals for all Phase I and Phase II streams, as well as the following 11 Miscellaneous Streams as identified in Table 4 of the Consent Order No. DE91NM-177.

  4. Non-storm water discharges technical report

    SciTech Connect (OSTI)

    Mathews, S.

    1994-07-01T23:59:59.000Z

    Lawrence Livermore National Laboratory (LLNL) submitted a Notice of Intent to the California State Water Resources Control Board (hereafter State Board) to discharge storm water associated with industrial activities under the California General Industrial Activity Storm Water National Pollutant Elimination System Discharge Permit (hereafter General Permit). As required by the General Permit, LLNL provided initial notification of non-storm water discharges to the Central Valley Regional Water Quality Control Board (hereafter Regional Board) on October 2, 1992. Additional findings and progress towards corrective actions were reported in subsequent annual monitoring reports. LLNL was granted until March 27, 1995, three years from the Notice of Intent submission date, to eliminate or permit the non-storm water discharges. On May 20, 1994, the Regional Board issued Waste Discharge Requirements (WDR Board Order No. 94-131, NPDES No. CA0081396) to LLNL for discharges of non-contact cooling tower wastewater and storm water related to industrial activities. As a result of the issuance of WDR 94-131, LLNL rescinded its coverage under the General Permit. WDR 94-131 allowed continued non-storm water discharges and requested a technical report describing the discharges LLNL seeks to permit. For the described discharges, LLNL anticipates the Regional Board will either waive Waste Discharge Requirements as allowed for in The Water Quality Control Plan for the California Regional Water Quality Control Board, Central Valley Region (hereafter Basin Plan) or amend Board Order 94-131 as appropriate.

  5. State Waste Discharge Permit application, 100-N Sewage Lagoon

    SciTech Connect (OSTI)

    Not Available

    1994-06-01T23:59:59.000Z

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). This document constitutes the State Waste Discharge Permit application for the 100-N Sewage Lagoon. Since the influent to the sewer lagoon is domestic waste water, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used. Although the 100-N Sewage Lagoon is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. The 100-N Sewage Lagoon serves the 100-N Area and other Hanford Site areas by receiving domestic waste from two sources. A network of sanitary sewer piping and lift stations transfers domestic waste water from the 100-N Area buildings directly to the 100-N Sewage Lagoon. Waste is also received by trucks that transport domestic waste pumped from on site septic tanks and holding tanks. Three ponds comprise the 100-N Sewage Lagoon treatment system. These include a lined aeration pond and stabilization pond, as well as an unlined infiltration pond. Both piped-in and trucked-in domestic waste is discharged directly into the aeration pond.

  6. State Waste Discharge Permit application for industrial discharge to land: 200 East Area W-252 streams

    SciTech Connect (OSTI)

    Not Available

    1993-12-01T23:59:59.000Z

    This document constitutes the WAC 173-216 State Waste Discharge Permit application for six W-252 liquid effluent streams at the Hanford Site. Appendices B through H correspond to Section B through H in the permit application form. Within each appendix, sections correspond directly to the respective questions on the application form. The appendices include: Product or service information; Plant operational characteristics; Water consumption and waterloss; Wastewater information; Stormwater; Other information; and Site assessment.

  7. UPDES General Permit for Discharges from Construction Activities...

    Open Energy Info (EERE)

    Discharges from Construction Activities (Permit No. UTRC00000) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: UPDES General Permit...

  8. File:CDPHE Industrial Individual Wastewater Discharge Permit...

    Open Energy Info (EERE)

    Industrial Individual Wastewater Discharge Permit Application.pdf Jump to: navigation, search File File history File usage Metadata File:CDPHE Industrial Individual Wastewater...

  9. State waste discharge permit application: 200 Area Treated Effluent Disposal Facility (Project W-049H)

    SciTech Connect (OSTI)

    Not Available

    1994-08-01T23:59:59.000Z

    As part of the original Hanford Federal Facility Agreement and Concent Order negotiations, US DOE, US EPA and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground to the Hanford Site are subject to permitting in the State Waste Discharge Permit Program (SWDP). This document constitutes the SWDP Application for the 200 Area TEDF stream which includes the following streams discharged into the area: Plutonium Finishing Plant waste water; 222-S laboratory Complex waste water; T Plant waste water; 284-W Power Plant waste water; PUREX chemical Sewer; B Plant chemical sewer, process condensate, steam condensate; 242-A-81 Water Services waste water.

  10. Montana Water Quality Permit Application, Nondegradation Authorization...

    Open Energy Info (EERE)

    LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material: Montana Water Quality Permit Application, Nondegradation Authorization, and Permit FeesPermitting...

  11. Notice of Intent (NOI) for Storm Water Discharges Associated...

    Open Energy Info (EERE)

    Intent (NOI) for Storm Water Discharges Associated with Construction Activities under TPDES General Permit (TXR150000) Jump to: navigation, search OpenEI Reference LibraryAdd to...

  12. Point Source Discharges to Surface Waters (North Carolina)

    Broader source: Energy.gov [DOE]

    This rule requires permits for control of sources of water pollution by providing the requirements and procedures for application and issuance of state National Pollutant Discharge Elimination...

  13. Overview of the Storm Water Individual Permit.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the LANL Storm Water Individual Permit? Poster, Individual Permit for Storm Water, NPDES Permit No...

  14. State Water Permit Regulation (Arkansas)

    Broader source: Energy.gov [DOE]

    It is the purpose of this regulation to adopt standards applicable to the storage, discharge, or disposal of any waste which, if unregulated, will cause pollution of waters of the state or result...

  15. AZPDES General Permit for Stormwater Discharges Associated with...

    Open Energy Info (EERE)

    Stormwater Discharges Associated with Construction Activity (Permit No. AZG2013-001) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther:...

  16. Permitting of Consumptive Uses of Water (Florida)

    Broader source: Energy.gov [DOE]

    Local water management districts are required to establish programs and regulations to provide for the permitting of consumptive uses of water. Such permitting programs are subject to the...

  17. Water Pollutant Discharge Act (Illinois)

    Broader source: Energy.gov [DOE]

    The discharge of oil in quantities which exceed the standards adopted by the Pollution Control Board, or the discharge of other pollutants directly or indirectly into the waters is prohibited....

  18. State waste discharge permit application: Hydrotest, maintenance and construction discharges. Revision 0

    SciTech Connect (OSTI)

    NONE

    1995-11-01T23:59:59.000Z

    On December 23, 1991, the US DOE< Richland Operation Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of the Department of Ecology Consent Order No. DE91NM-177 (216 Consent Order) (Ecology and US DOE 1991). The 216 Consent Order list regulatory milestones for liquid effluent streams at the Hanford Site and requires compliance with the permitting requirements of Washington Administrative Code. Hanford Site liquid effluent streams discharging to the soil column have been categorized on the 216 Consent Order as follows: Phase I Streams; Phase II Streams; Miscellaneous Streams. Phase I and Phase II Streams were initially addressed in two report. Miscellaneous Streams are subject to the requirements of several milestones identified in the 216 Consent Order. This document constitutes the Categorical State Waste Discharge Permit application for hydrotest,maintenance and construction discharges throughout the Hanford Site. This categorical permit application form was prepared and approved by Ecology.

  19. Oregon Water Quality Permit Program (Stormwater - Industrial...

    Open Energy Info (EERE)

    Oregon Water Quality Permit Program (Stormwater - Industrial Activities) Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Water Quality...

  20. State Waste Discharge Permit Application: Electric resistance tomography testing

    SciTech Connect (OSTI)

    Not Available

    1994-04-01T23:59:59.000Z

    This permit application documentation is for a State Waste Discharge Permit issued in accordance with requirements of Washington Administrative Code 173-216. The activity being permitted is a technology test using electrical resistance tomography. The electrical resistance tomography technology was developed at Lawrence Livermore National Laboratory and has been used at other waste sites to track underground contamination plumes. The electrical resistance tomography technology measures soil electrical resistance between two electrodes. If a fluid contaminated with electrolytes is introduced into the soil, the soil resistance is expected to drop. By using an array of measurement electrodes in several boreholes, the areal extent of contamination can be estimated. At the Hanford Site, the purpose of the testing is to determine if the electrical resistance tomography technology can be used in the vicinity of large underground metal tanks without the metal tank interfering with the test. It is anticipated that the electrical resistance tomography technology will provide a method for accurately detecting leaks from the bottom of underground tanks, such as the Hanford Site single-shell tanks.

  1. Individual Permit for Storm Water

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Compliance Miscellaneous EPA Submittals Public Meetings Renewal Application Construction Certifications Corrective Action Storm Water Analytical Period Get updates on LANL...

  2. State Waste Discharge Permit ST-4502 Implementation Plan

    SciTech Connect (OSTI)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27T23:59:59.000Z

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  3. Oregon Water Quality Permit Program (Stormwater Discharge Permits) Website

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri:Energy Information FeesInformationWebsite | Open Energy| Open

  4. Montana Ground Water Pollution Control System Permit Application...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Web Site: Montana Ground Water Pollution Control System Permit Application Forms Webpage Abstract Provides a list of permit...

  5. WSDE Report: Wastewater Discharge Permits in Washington State | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide Permit webpage Jump to: navigation, search

  6. Oregon Air Contaminant Discharge Permits Webpage | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri: EnergyExcellenceOfficeOhio:OpowerOrchard Lake439.300 -401Permits

  7. EPA - Ground Water Discharges (EPA's Underground Injection Control...

    Open Energy Info (EERE)

    Discharges (EPA's Underground Injection Control Program) webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA - Ground Water Discharges (EPA's...

  8. State waste discharge permit application for the 200 Area Effluent Treatment Facility and the State-Approved Land Disposal Site

    SciTech Connect (OSTI)

    Not Available

    1993-08-01T23:59:59.000Z

    Application is being made for a permit pursuant to Chapter 173--216 of the Washington Administrative Code (WAC), to discharge treated waste water and cooling tower blowdown from the 200 Area Effluent Treatment Facility (ETF) to land at the State-Approved Land Disposal Site (SALDS). The ETF is located in the 200 East Area and the SALDS is located north of the 200 West Area. The ETF is an industrial waste water treatment plant that will initially receive waste water from the following two sources, both located in the 200 Area on the Hanford Site: (1) the Liquid Effluent Retention Facility (LERF) and (2) the 242-A Evaporator. The waste water discharged from these two facilities is process condensate (PC), a by-product of the concentration of waste from DSTs that is performed in the 242-A Evaporator. Because the ETF is designed as a flexible treatment system, other aqueous waste streams generated at the Hanford Site may be considered for treatment at the ETF. The origin of the waste currently contained in the DSTs is explained in Section 2.0. An overview of the concentration of these waste in the 242-A Evaporator is provided in Section 3.0. Section 4.0 describes the LERF, a storage facility for process condensate. Attachment A responds to Section B of the permit application and provides an overview of the processes that generated the wastes, storage of the wastes in double-shell tanks (DST), preliminary treatment in the 242-A Evaporator, and storage at the LERF. Attachment B addresses waste water treatment at the ETF (under construction) and the addition of cooling tower blowdown to the treated waste water prior to disposal at SALDS. Attachment C describes treated waste water disposal at the proposed SALDS.

  9. Industrial Permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protection Obeying Environmental Laws Industrial Permit Industrial Permit The Industrial Permit authorizes the Laboratory to discharge point-source effluents under the...

  10. Vermont Permit and License Information: NPDES Stormwater General...

    Open Energy Info (EERE)

    SitesLegal Abstract Permit and licensing information for Clean Water Act 304 National Pollution Discharge Elimination System (NPDES) Permits for general construction. Published NA...

  11. Produced water discharges to the Gulf of Mexico: Background information for ecological risk assessments

    SciTech Connect (OSTI)

    Meinhold, A.F.; Holtzman, S.; DePhillips, M.P.

    1996-06-01T23:59:59.000Z

    This report reviews ecological risk assessment concepts and methods; describes important biological resources in the Gulf of Mexico of potential concern for produced water impacts; and summarizes data available to estimate exposure and effects of produced water discharges. The emphasis is on data relating to produced water discharges in the central and western Gulf of Mexico, especially in Louisiana. Much of the summarized data and cited literature are relevant to assessments of impacts in other regions. Data describing effects on marine and estuarine fishes, mollusks, crustaceans and benthic invertebrates are emphasized. This review is part of a series of studies of the health and ecological risks from discharges of produced water to the Gulf of Mexico. These assessments will provide input to regulators in the development of guidelines and permits, and to industry in the use of appropriate discharge practices.

  12. File:06NVCDrinkingWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealandORCEncroachment.pdf Jump to:-FD-aIDCDrinkingWaterPermit.pdf Jump to:Open6NVCDrinkingWaterPermit.pdf

  13. Storm Water Analytical Period

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protection Obeying Environmental Laws Individual Permit Storm Water Analytical Period Storm Water Analytical Period The Individual Permit authorizes the discharge of storm...

  14. Regulations for the Rhode Island Pollutant Discharge Elimination System (Rhode Island)

    Broader source: Energy.gov [DOE]

    These regulations aim to protect surface water from pollutant discharges. They describe allowable discharges in the state that are subject to permits, discharges which may be made without permits,...

  15. Washington Construction Storm Water General Permit | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide PermitInformation Construction Storm Water General PermitLegal

  16. Oklahoma Pollutant Discharge Elimination System Act (Oklahoma)

    Broader source: Energy.gov [DOE]

    The Department of Environmental Quality regulates facilities that discharge any pollutant into waters of the state. Permits must be acquired before the discharge of any pollutants into state waters...

  17. Permits

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for RenewableSpeedingBiomassPPPO WebsitePalmsthe PriceOptimizationUSING CRonOther Permits

  18. Submission of Notice of Termination of Coverage Under the National Pollutant Discharge Elimination System General Permit No. CAS000002 for WDID No. 201C349114, Lawrence Livermore National Laboratory Ignition Facility Construction Project

    SciTech Connect (OSTI)

    Brunckhorst, K

    2009-04-21T23:59:59.000Z

    This is the completed Notice of Termination of Coverage under the General Permit for Storm Water Discharges Associated with Construction Activity. Construction activities at the National Ignition Facility Construction Project at Lawrence Livermore National Laboratory are now complete. The Notice of Termination includes photographs of the completed construction project and a vicinity map.

  19. Discharge indices for water quality loads Richard M. Vogel

    E-Print Network [OSTI]

    Vogel, Richard M.

    : effective discharge, transport, sediment, constituents, rating curve, half-load Citation: Vogel, R. M., J. RDischarge indices for water quality loads Richard M. Vogel Department of Civil and Environmental load is ultimately the quantity of interest, we define a new index, the half-load discharge, which

  20. Properties of water surface discharge at different pulse repetition rates

    SciTech Connect (OSTI)

    Ruma,; Yoshihara, K. [Graduate School of Science and Technology, Kumamoto University, Kumamoto 860-8555 (Japan); Hosseini, S. H. R., E-mail: hosseini@kumamoto-u.ac.jp; Sakugawa, T.; Akiyama, H. [Graduate School of Science and Technology, Kumamoto University, Kumamoto 860-8555 (Japan); Institute of Pulsed Power Science, Kumamoto University, Kumamoto 860-8555 (Japan); Akiyama, M. [Department of Electrical and Electronic Engineering, Kagoshima University, Kagoshima 890-0065 (Japan); Lukeš, P. [Institute of Plasma Physics, AS CR, Prague, Prague 18200 (Czech Republic)

    2014-09-28T23:59:59.000Z

    The properties of water surface discharge plasma for variety of pulse repetition rates are investigated. A magnetic pulse compression (MPC) pulsed power modulator able to deliver pulse repetition rates up to 1000?Hz, with 0.5?J per pulse energy output at 25?kV, was used as the pulsed power source. Positive pulse with a point-to-plane electrode configuration was used for the experiments. The concentration and production yield of hydrogen peroxide (H{sub 2}O{sub 2}) were quantitatively measured and orange II organic dye was treated, to evaluate the chemical properties of the discharge reactor. Experimental results show that the physical and chemical properties of water surface discharge are not influenced by pulse repetition rate, very different from those observed for under water discharge. The production yield of H{sub 2}O{sub 2} and degradation rate per pulse of the dye did not significantly vary at different pulse repetition rates under a constant discharge mode on water surface. In addition, the solution temperature, pH, and conductivity for both water surface and underwater discharge reactors were measured to compare their plasma properties for different pulse repetition rates. The results confirm that surface discharge can be employed at high pulse repetition rates as a reliable and advantageous method for industrial and environmental decontamination applications.

  1. File:06HICDrinkingWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealandORCEncroachment.pdf Jump to:-FD-a -NVBSundryNotice6HICDrinkingWaterPermit.pdf Jump to: navigation,

  2. File:06IDCDrinkingWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealandORCEncroachment.pdf Jump to:-FD-aIDCDrinkingWaterPermit.pdf Jump to: navigation, search File File

  3. File:06MTCDrinkingWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealandORCEncroachment.pdf Jump to:-FD-aIDCDrinkingWaterPermit.pdf Jump to: navigation, search

  4. File:06ORCDrinkingWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealandORCEncroachment.pdf Jump to:-FD-aIDCDrinkingWaterPermit.pdf

  5. Alaska DEC Water Permit Search | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcat 1AMEEAisin Seiki G60Alameda County,90DEC Water Permit Search

  6. Characteristics of produced water discharged to the Gulf of Mexico hypoxiczone.

    SciTech Connect (OSTI)

    Veil, J. A.; Kimmell, T. A.; Rechner, A. C.

    2005-08-24T23:59:59.000Z

    Each summer, an area of low dissolved oxygen (the hypoxic zone) forms in the shallow nearshore Gulf of Mexico waters from the Mississippi River Delta westward to near the Texas/Louisiana border. Most scientists believe that the leading contributor to the hypoxic zone is input of nutrients (primarily nitrogen and phosphorus compounds) from the Mississippi and Atchafalaya Rivers. The nutrients stimulate growth of phytoplankton. As the phytoplankton subsequently die, they fall to the bottom waters where they are decomposed by microorganisms. The decomposition process consumes oxygen in the bottom waters to create hypoxic conditions. Sources other than the two rivers mentioned above may also contribute significant quantities of oxygen-demanding pollutants. One very visible potential source is the hundreds of offshore oil and gas platforms located within or near the hypoxic zone. Many of these platforms discharge varying volumes of produced water. However, only limited data characterizing oxygen demand and nutrient concentration and loading from offshore produced water discharges have been collected. No comprehensive and coordinated oxygen demand data exist for produced water discharges in the Gulf of Mexico. This report describes the results of a program to sample 50 offshore oil and gas platforms located within the Gulf of Mexico hypoxic zone. The program was conducted in response to a requirement in the U.S. Environmental Protection Agency (EPA) general National Pollutant Discharge Elimination System (NPDES) permit for offshore oil and gas discharges. EPA requested information on the amount of oxygen-demanding substances contained in the produced water discharges. This information is needed as inputs to several water quality models that EPA intends to run to estimate the relative contributions of the produced water discharges to the occurrence of the hypoxic zone. Sixteen platforms were sampled 3 times each at approximately one-month intervals to give an estimate of temporal variability. An additional 34 platforms were sampled one time. The 50 sampled platforms were scattered throughout the hypoxic zone to give an estimate of spatial variability. Each platform was sampled for biochemical oxygen demand (BOD), total organic carbon (TOC), nitrogen (ammonia, nitrate, nitrite, and total Kjeldahl nitrogen [TKN]), and phosphorus (total phosphorus and orthophosphate). In addition to these parameters, each sample was monitored for pH, conductivity, salinity, and temperature. The sampling provided average platform concentrations for each parameter. Table ES-1 shows the mean, median, maximum, and minimum for the sampled parameters. For some of the parameters, the mean is considerably larger than the median, suggesting that one or a few data points are much higher than the rest of the points (outliers). Chapter 4 contains an extensive discussion of outliers and shows how the sample results change if outliers are deleted from consideration. A primary goal of this study is to estimate the mass loading (lb/day) of each of the oxygen-demanding pollutants from the 50 platforms sampled in the study. Loading is calculated by multiplying concentrations by the discharge volume and then by a conversion factor to allow units to match. The loadings calculated in this study of 50 platforms represent a produced water discharge volume of about 176,000 bbl/day. The total amount of produced water generated in the hypoxic zone during the year 2003 was estimated as 508,000 bbl/day. This volume is based on reports by operators to the Minerals Management Service each year. It reflects the volume of produced water that is generated from each lease, not the volume that is discharged from each platform. The mass loadings from offshore oil and gas discharges to the entire hypoxic zone were estimated by multiplying the 50-platform loadings by the ratio of total water generated to 50-platform discharge volume. The loadings estimated for the 50 platforms and for the entire hypoxic zone are shown in Table ES-2. These estimates and the sampling data from 50 platfo

  7. South Carolina Surface Water Withdrawal, Permitting Use, and Reporting Act (South Carolina)

    Broader source: Energy.gov [DOE]

    Surface water withdrawals exceeding three million gallons during any one month require a permit; a permit will only be granted if the Department of Health and Environmental Control determines that...

  8. Coalbed methane produced water management guide treatment and discharge to surface waters: Black Warrior Basin, Alabama. Final report, April 1991-May 1993

    SciTech Connect (OSTI)

    Davis, H.A.

    1993-05-01T23:59:59.000Z

    To assist coalbed methane in their efforts to manage produced waters in an environmentally acceptable manner, GRI, in cooperation with the member companies of the Coalbed Methane Association of Alabama, developed a guidance manual that presents the state-of-the-art methodology for managing Black Warrior Basin produced water through the use of treatment ponds and National Pollutant Discharge Elimination System (NPDES) permits. Six treatment pond systems were studied to develop information for the manual. Topics included in the manual are produced water characteristics, NPDES permit requirements, sample collection and testing, pond based treatment methods, treatment pond management, and process troubleshooting.

  9. Using Arc/Info GIS to help implement the National Pollutant Discharge Elimination System (NPDES) stormwater permit for Los Angeles County

    SciTech Connect (OSTI)

    Levine, D.A.; Pace, P.J. [Oak Ridge National Lab., TN (United States); Woods, J.A.; DePoto, W. [Los Angeles County Department of Public Works, Alhambra, CA (United States). Environmental Programs Division

    1997-06-01T23:59:59.000Z

    One of Los Angeles County Department of Public Works` many responsibilities is to manage non-point pollution that enters the storm drain network within Los Angeles County. The management of this non-point source pollution is mandated by the NPDES guidelines under the Federal Clean Water Act. These guidelines require the County to monitor the drainage network and the storm water and urban runoff flowing through it. The County covers over 3,117 square miles, with the NPDES Permit covering over 3,100 square miles and over 2500 miles of storm drains. A proposed solution to monitor and manage this vast geographic area is centered upon an Arc/Info GIS. Some of the many concerns which need to be addressed include the administration and evaluation of Best Management Practices (BMP`s), storm drain inspection for illegal connections and illicit discharges, and pollutant load assessment and modeling. The storm drain network and other coverages will be related to external data bases currently used for facility management and planning. This system would be used for query purposes to perform spatial modeling and {open_quotes}what if{close_quotes} scenarios needed to create maps and reports required by the permit and to evaluate various BMP implementation strategies.

  10. Recycled Water Reuse Permit Renewal Application for the Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond

    SciTech Connect (OSTI)

    No Name

    2014-10-01T23:59:59.000Z

    ABSTRACT This renewal application for the Industrial Wastewater Reuse Permit (IWRP) WRU-I-0160-01 at Idaho National Laboratory (INL), Materials and Fuels Complex (MFC) Industrial Waste Ditch (IWD) and Industrial Waste Pond (IWP) is being submitted to the State of Idaho, Department of Environmental Quality (DEQ). This application has been prepared in compliance with the requirements in IDAPA 58.01.17, Recycled Water Rules. Information in this application is consistent with the IDAPA 58.01.17 rules, pre-application meeting, and the Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater (September 2007). This application is being submitted using much of the same information contained in the initial permit application, submitted in 2007, and modification, in 2012. There have been no significant changes to the information and operations covered in the existing IWRP. Summary of the monitoring results and operation activity that has occurred since the issuance of the WRP has been included. MFC has operated the IWP and IWD as regulated wastewater land treatment facilities in compliance with the IDAPA 58.01.17 regulations and the IWRP. Industrial wastewater, consisting primarily of continuous discharges of nonhazardous, nonradioactive, routinely discharged noncontact cooling water and steam condensate, periodic discharges of industrial wastewater from the MFC facility process holdup tanks, and precipitation runoff, are discharged to the IWP and IWD system from various MFC facilities. Wastewater goes to the IWP and IWD with a permitted annual flow of up to 17 million gallons/year. All requirements of the IWRP are being met. The Operations and Maintenance Manual for the Industrial Wastewater System will be updated to include any new requirements.

  11. Permits and Easements for Construction and Related Activities on Public Lands and Waters (Iowa)

    Broader source: Energy.gov [DOE]

    These rules establish procedures and regulate the evaluation and issuance of permits for construction or other related activities that alter the physical characteristics of public lands and waters...

  12. UNIQUE APPROACH TO COMPLYING WITH VERY LOW NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMIT LIMITS FOR COPPER

    SciTech Connect (OSTI)

    Payne, B.; Halverson, N.; Looney, B.; Millings, M.; Nichols, R.; Noonkester, J.

    2011-03-15T23:59:59.000Z

    The NPDES permit issued to the Savannah River Site (SRS) in 2003 contained copper limits as low as six micrograms per liter. It also contained compliance schedules that provided SRS with anywhere from three to five years to select and implement projects that would enable compliance at several outfalls. Some outfall problems were much more difficult to correct than others. SRS personnel implemented several innovative projects in order to meet compliance schedule deadlines as inexpensively as possible. One innovation, constructing a humic acid feed system to increase effluent dissolved organic carbon (DOC) content, has proven to be very successful.

  13. Oklahoma Pollutant Discharge Elimination System (OPDES) Standards (Oklahoma)

    Broader source: Energy.gov [DOE]

    This program of the Water Quality Division of the Department of Environmental Quality sets the point source, biosolids (sewage sludge), and stormwater permitting standards for discharges to the...

  14. Environmental Compliance Guide. Guidance manual for Department of Energy compliance with the Clean Water Act: National Pollutant Discharge Elimination System (NPDES)

    SciTech Connect (OSTI)

    Not Available

    1982-07-01T23:59:59.000Z

    This manual provides general guidance for Department of Energy (DOE) officials for complying with Sect. 402 of the Clean Water Act (CWA) of 1977 and amendments. Section 402 authorizes the US Environmental Protection Agency (EPA) or states with EPA approved programs to issue National Pollutant Discharge Elimination System (NPDES) permits for the direct discharge of waste from a point source into waters of the United States. Although the nature of a project dictates the exact information requirements, every project has similar information requirements on the environmental setting, type of discharge(s), characterization of effluent, and description of operations and wastewater treatment. Additional information requirements for projects with ocean discharges, thermal discharges, and cooling water intakes are discussed. Guidance is provided in this manual on general methods for collecting, analyzing, and presenting information for an NPDES permit application. The NPDES program interacts with many sections of the CWA; therefore, background material on pertinent areas such as effluent limitations, water quality standards, toxic substances, and nonpoint source pollutants is included in this manual. Modifications, variances, and extensions applicable to NPDES permits are also discussed.

  15. Discharge waters from a power plant as an influent of phytoplankton in adjacent estuarine waters

    E-Print Network [OSTI]

    Strong, Clyde B

    1977-01-01T23:59:59.000Z

    DISCHARGE WATERS FROM A POWER PLANT AS AN 1NFLUENT OF PHYTOPLANKTON IN ADJACENT ESTUARINE WATERS A Thesis 'by CLYDE B. STRONG, JR. Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirement... for the degree of MASTER OF SCIENCE December 1977 Major Su'bject: Wildlife and Fisheries Sciences DISCHARGE WATERS FROM A POWER PLANT AS AN INFLUEN'I' OF PHYTOPLANKTON IN ADJACENT ESTUARINE WATERS A Thesis by CLYDE B. STRONG, JR. Approved as to sty...

  16. Recycled Water Reuse Permit Renewal Application for the Central Facilities Area Sewage Treatment Plant

    SciTech Connect (OSTI)

    Mike Lewis

    2014-09-01T23:59:59.000Z

    This renewal application for a Recycled Water Reuse Permit is being submitted in accordance with the Idaho Administrative Procedures Act 58.01.17 “Recycled Water Rules” and the Municipal Wastewater Reuse Permit LA-000141-03 for continuing the operation of the Central Facilities Area Sewage Treatment Plant located at the Idaho National Laboratory. The permit expires March 16, 2015. The permit requires a renewal application to be submitted six months prior to the expiration date of the existing permit. For the Central Facilities Area Sewage Treatment Plant, the renewal application must be submitted by September 16, 2014. The information in this application is consistent with the Idaho Department of Environmental Quality’s Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater and discussions with Idaho Department of Environmental Quality personnel.

  17. Washington Environmental Permit Handbook - 401 Water Quality Certification

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide PermitInformationIsland: Energy ResourcesProcess | Open| Open

  18. Montana Water Quality Permit Application, Nondegradation Authorization, and

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant JumpMarysville,Missoula, Montana:Northeast AsiaAir|Underground Storage TanksPermit

  19. Nevada Application for Permit to Appropriate Water | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania: EnergyEnergyPPCR) JumpAir Quality Permitting

  20. Zero-discharge of nutrients and water in a willow dominated constructed wetland

    E-Print Network [OSTI]

    Brix, Hans

    evapotranspire the water, and nutrients can be recycled via the willow biomass produced in the system. The willow; recycling; Salix; water treatment; willow; zero-discharge Introduction Discharge of domestic sewage from this is not possible because of clayish soil conditions or high ground water tables. Other treatment solutions, like

  1. File:Texas NOI for Storm Water Discharges Associated with Construction...

    Open Energy Info (EERE)

    NOI for Storm Water Discharges Associated with Construction Activities (TXR150000).pdf Jump to: navigation, search File File history File usage Metadata File:Texas NOI for Storm...

  2. Building StrongBuilding Strong Clean Water Act Section 404 Permitting Program

    E-Print Network [OSTI]

    Minnesota, University of

    Building StrongBuilding Strong Clean Water Act Section 404 Permitting Program Updates: Jurisdiction 1, 2009 #12;Building StrongBuilding Strong Presentation Outline · Part 1 Clean Water Act Process ­ The problem ­ The merger process #12;Building StrongBuilding Strong Rapanos at the Supreme Court

  3. Rules and Regulations Pertaining to a User Fee System for Point Source Dischargers that Discharge Pollutants into the Waters of the State (Rhode Island)

    Broader source: Energy.gov [DOE]

    These regulations establish a user fee system for point source dischargers that discharge pollutants into the surface waters of the State. The funds from such fees are used by the Department of...

  4. Water Pollution (Illinois)

    Broader source: Energy.gov [DOE]

    This article states regulations for water quality standards, effluent standards, monitoring and reporting methods, sewer discharge criteria and information about permits. It is the purpose of...

  5. File:06ORBConstructionStormWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealandORCEncroachment.pdf Jump to:-FD-aIDCDrinkingWaterPermit.pdf JumpORBConstructionStormWaterPermit.pdf

  6. Groundwater Discharge of Mercury to California Coastal Waters

    E-Print Network [OSTI]

    Flegal, Russell; Paytan, Adina; Black, Frank

    2009-01-01T23:59:59.000Z

    R. 2009. Submarine groundwater discharge of total mercuryof nutrient-enriched fresh groundwater at Stinson Beach,Priya Ganguli collects groundwater at Elkhorn Slough. Coal-

  7. Modeling the Physical and Biochemical Influence of Ocean Thermal Energy Conversion Plant Discharges into their Adjacent Waters

    Broader source: Energy.gov [DOE]

    Modeling the Physical and Biochemical Influence of Ocean Thermal Energy Conversion Plant Discharges into their Adjacent Waters

  8. Many Task Computing for Modeling the Fate of Oil Discharged from the Deep Water Horizon Well

    E-Print Network [OSTI]

    tons of crude oil into the Gulf of Mexico. In order to understand the fate and impact of the discharged, causing the riser pipe to rupture and crude oil to flow into the Gulf of Mexico from an approximate depthMany Task Computing for Modeling the Fate of Oil Discharged from the Deep Water Horizon Well

  9. Stormwater Permits (Vermont)

    Broader source: Energy.gov [DOE]

    Stormwater permits are required for the construction of a new generation facility, the reconstruction or expansion of a facility, the operation of a generation facility which discharges stormwater...

  10. A radiocarbon method and multi-tracer approach to quantifying groundwater discharge to coastal waters

    E-Print Network [OSTI]

    Gramling, Carolyn M

    2003-01-01T23:59:59.000Z

    Groundwater discharge into estuaries and the coastal ocean is an important mechanism for the transport of dissolved chemical species to coastal waters. Because many dissolved species are present in groundwater in concentrations ...

  11. Chemical Treatment Fosters Zero Discharge by Making Cooling Water Reusable

    E-Print Network [OSTI]

    Boffardi, B. P.

    Over the past decade, the water requirements for cooling industrial manufacturing processes have changed dramatically. Once-through cooling has been largely replaced by open recirculating cooling water methods. This approach reduces water...

  12. Oregon NPDES Storm Water Discharge Permit (DEQ Form 1200-A) | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri:Energy Information Fees for

  13. File:06COBConstructionStormWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealandORCEncroachment.pdf Jump to:-FD-a -NVBSundryNotice (2).pdfCOBConstructionStormWaterPermit.pdf Jump to:

  14. File:06MTBConstructionStormWaterPermit (7).pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealandORCEncroachment.pdf Jump to:-FD-aIDCDrinkingWaterPermit.pdf Jump to: navigation, search File

  15. File:06NVBConstructionStormWaterPermit (1).pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealandORCEncroachment.pdf Jump to:-FD-aIDCDrinkingWaterPermit.pdf Jump to:Open

  16. Zero Discharge Water Management for Horizontal Shale Gas Well Development

    SciTech Connect (OSTI)

    Paul Ziemkiewicz; Jennifer Hause; Raymond Lovett; David Locke Harry Johnson; Doug Patchen

    2012-03-31T23:59:59.000Z

    Hydraulic fracturing technology (fracking), coupled with horizontal drilling, has facilitated exploitation of huge natural gas (gas) reserves in the Devonian-age Marcellus Shale Formation (Marcellus) of the Appalachian Basin. The most-efficient technique for stimulating Marcellus gas production involves hydraulic fracturing (injection of a water-based fluid and sand mixture) along a horizontal well bore to create a series of hydraulic fractures in the Marcellus. The hydraulic fractures free the shale-trapped gas, allowing it to flow to the well bore where it is conveyed to pipelines for transport and distribution. The hydraulic fracturing process has two significant effects on the local environment. First, water withdrawals from local sources compete with the water requirements of ecosystems, domestic and recreational users, and/or agricultural and industrial uses. Second, when the injection phase is over, 10 to 30% of the injected water returns to the surface. This water consists of flowback, which occurs between the completion of fracturing and gas production, and produced water, which occurs during gas production. Collectively referred to as returned frac water (RFW), it is highly saline with varying amounts of organic contamination. It can be disposed of, either by injection into an approved underground injection well, or treated to remove contaminants so that the water meets the requirements of either surface release or recycle use. Depending on the characteristics of the RFW and the availability of satisfactory disposal alternatives, disposal can impose serious costs to the operator. In any case, large quantities of water must be transported to and from well locations, contributing to wear and tear on local roadways that were not designed to handle the heavy loads and increased traffic. The search for a way to mitigate the situation and improve the overall efficiency of shale gas production suggested a treatment method that would allow RFW to be used as make-up water for successive fracs. RFW, however, contains dissolved salts, suspended sediment and oils that may interfere with fracking fluids and/or clog fractures. This would lead to impaired well productivity. The major technical constraints to recycling RFW involves: identification of its composition, determination of industry standards for make-up water, and development of techniques to treat RFW to acceptable levels. If large scale RFW recycling becomes feasible, the industry will realize lower transportation and disposal costs, environmental conflicts, and risks of interruption in well development schedules.

  17. Hawaii National Pollutant Discharge Elimination System (NPDES...

    Open Energy Info (EERE)

    LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material: Hawaii National Pollutant Discharge Elimination System (NPDES) Permit PacketPermittingRegulatory...

  18. Hydrogeologic controls on ground-water and contaminant discharge to the Columbia River near the Hanford Townsite

    SciTech Connect (OSTI)

    Luttrell, S.P.; Newcomer, D.R.; Teel, S.S.; Vermeul, V.R.

    1992-11-01T23:59:59.000Z

    The purpose of this study is to quantify ground-water and contaminant discharge to the Columbia River in the Hanford Townsite vicinity. The primary objectives of the work are to: describe the hydrogeologic setting and controls on ground-water movement and contaminant discharge to the Columbia River; understand the river/aquifer relationship and its effects on contaminant discharge to the Columbia River; quantify the ground-water and contaminant mass discharge to the Columbia River; and provide data that may be useful for a three-dimensional model of ground-water flow and contaminant transport in the Hanford Townsite study area. The majority of ground-water contamination occurs within the unconfined aquifer; therefore, ground-water and contaminant discharge from the unconfined aquifer is the emphasis of this study. The period of study is primarily from June 1990 through March 1992.

  19. TPDES General Permit No. TXR150000

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    individual permit. This permit does not authorize the discharge or land disposal of any wastewater from concrete batch plants at regulated construction sites. Authorization for...

  20. Recombination time of an RF discharge plasma in the presence of water molecules

    SciTech Connect (OSTI)

    Protasevich, E.T.

    1986-05-01T23:59:59.000Z

    The authors show that the introduction of water vapor into an electrodeless rf discharge noticeably reduces the excitation temperature and substantially increases the recombination time of the plasma. An attempt is made to explain the physical processes associated with these phenomena.

  1. Critical discharge of initially subcooled water through slits. [PWR; BWR

    SciTech Connect (OSTI)

    Amos, C N; Schrock, V E

    1983-09-01T23:59:59.000Z

    This report describes an experimental investigation into the critical flow of initially subcooled water through rectangular slits. The study of such flows is relevant to the prediction of leak flow rates from cracks in piping, or pressure vessels, which contain sufficient enthalpy that vaporization will occur if they are allowed to expand to the ambient pressure. Two new analytical models, which allow for the generation of a metastable liquid phase, are developed. Experimental results are compared with the predictions of both these new models and with a Fanno Homogeneous Equilibrium Model.

  2. Plasma Kinetics in Electrical Discharge in Mixture of Air, Water and Ethanol Vapors for Hydrogen Enriched Syngas Production

    E-Print Network [OSTI]

    Shchedrin, A I; Ryabtsev, A V; Chernyak, V Ya; Yukhymenko, V V; Olszewski, S V; Naumov, V V; Prysiazhnevych, I V; Solomenko, E V; Demchina, V P; Kudryavtsev, V S

    2008-01-01T23:59:59.000Z

    The complex theoretical and experimental investigation of plasma kinetics of the electric discharge in the mixture of air and ethanol-water vapors is carried out. The discharge was burning in the cavity, formed by air jets pumping between electrodes, placed in aqueous ethanol solution. It is found out that the hydrogen yield from the discharge is maximal in the case when ethanol and water in the solution are in equal amounts. It is shown that the hydrogen production increases with the discharge power and reaches the saturation at high value. The concentrations of the main stable gas-phase components, measured experimentally and calculated numerically, agree well in the most cases.

  3. Device for generation of pulsed corona discharge

    DOE Patents [OSTI]

    Gutsol, Alexander F. (San Ramon, CA); Fridman, Alexander (Marlton, NJ); Blank, Kenneth (Philadelphia, PA); Korobtsev, Sergey (Moscow, RU); Shiryaevsky, Valery (Moscow, RU); Medvedev, Dmitry (Moscow, RU)

    2012-05-08T23:59:59.000Z

    The invention is a method and system for the generation of high voltage, pulsed, periodic corona discharges capable of being used in the presence of conductive liquid droplets. The method and system can be used, for example, in different devices for cleaning of gaseous or liquid media using pulsed corona discharge. Specially designed electrodes and an inductor increase the efficiency of the system, permit the plasma chemical oxidation of detrimental impurities, and increase the range of stable discharge operations in the presence of droplets of water or other conductive liquids in the discharge chamber.

  4. Regulatory Guidance Letter 88-06 SUBJECT: Nationwide Permit Guidance

    E-Print Network [OSTI]

    US Army Corps of Engineers

    -casting of material that occurs with normal construction practice provided the best management practices at 330.S. The discharge is further limited by 33 CFR 330.6, best management practices, which require the minimization the outfall has an NPDES permit. Section 405 of the Water Quality Act of 1987 exempts storm water outfalls

  5. UIC permitting process for class IID and Class III wells: Protection of drinking water in New York State

    SciTech Connect (OSTI)

    Hillenbrand, C.J. [EPA, New York, NY (United States)

    1995-09-01T23:59:59.000Z

    The U.S. Environmental Protection Agency (EPA) Region II, Underground Injection Control (UIC) Program regulates injection wells in the State of New York to protect drinking water; UIC regulations can be found under Title 40 of the Code of Federal Regulations Parts 124, 144, 146 and 147. Operators of solution mining injection wells (UIC Class IIIG) and produced fluid disposal wells (UIC Class IID) are required to obtain an UIC permit for authorization to inject. The permitting process requires submittal of drinking water, geologic and proposed operational data in order to assure that pressure build-up within the injection zone will not compromise confining layers and allow vertical migration of fluid into Underground Sources of Drinking Water (USDW). Additional data is required within an Area of Review (AOR), defined as an area determined by the intersection of the adjusted potentiometric surface produced by injection and a depth 50 feet below the base of the lowermost USDW, or a radius of 1/4 mile around the injection well, whichever is greater. Locations of all wells in the AOR must be identified, and completion reports and plugging reports must be submitted. Requirements are set for maximum injection pressure and flow rates, monitoring of brine properties of the injection well and monitoring of water supply wells in the AOR for possible contamination. Any noncompliance with permit requirements constitutes a violation of the Safe Drinking Water Act and is grounds for enforcement action, including possible revocation of permit. Presently four Class IID wells are authorized under permit in New York State. The Queenston sandstone, Medina sandstone, Salina B, Akron dolomite and Oriskany sandstone have been used for brine disposal; the lower Ordovician-Cambrian section is currently being considered as an injection zone. Over one hundred Class IIIG wells are authorized under permit in New York State and all have been utilized for solution mining of the Syracuse salt.

  6. Microsoft Word - Groundwater Discharge Permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHighandSWPA / SPRA / USACE SWPAURTeC:8CO6 Figure Fuel3S FINAL8Einstein3459

  7. The Contribution of Environmental Siting and Permitting Requirements to the Cost of Energy for Oscillating Water Column Wave Energy Devices

    SciTech Connect (OSTI)

    Copping, Andrea E.; Geerlofs, Simon H.; Hanna, Luke A.

    2013-09-30T23:59:59.000Z

    Responsible deployment of marine and hydrokinetic (MHK) devices in estuaries, coastal areas, and major rivers requires that biological resources and ecosystems be protected through siting and permitting (consenting) processes. Scoping appropriate deployment locations, collecting pre-installation (baseline) and post-installation data all add to the cost of developing MHK projects, and hence to the cost of energy. Under the direction of the U.S. Department of Energy, Pacific Northwest National Laboratory scientists have developed logic models that describe studies and processes for environmental siting and permitting. Each study and environmental permitting process has been assigned a cost derived from existing and proposed tidal, wave, and riverine MHK projects, as well as expert opinion of marine environmental research professionals. Cost estimates have been developed at the pilot and commercial scale. The reference model described in this document is an oscillating water column device deployed in Northern California at approximately 50 meters water depth.

  8. Maricopa Assn. of Governments- PV and Solar Domestic Water Heating Permitting Standards

    Broader source: Energy.gov [DOE]

    In an effort to promote uniformity, the Maricopa Association of Governments (MAG) approved standard procedures for securing necessary electrical/building permits for residential (single-family) and...

  9. The detection and modelling of surface thermal structures and ground water discharges

    E-Print Network [OSTI]

    Roberts, Douglas Vincent

    1985-01-01T23:59:59.000Z

    . , Southern Illinois University Chairman of Advisory Committee: Dr. Earl R. Hoskins On March 29, 1973, data were collected by a thermal infrared scanner mounted in a twin-engine aircraft over a 55-mile stretch of the Clark Fork River in northwestern... on a VAX Il/750 interfaced with an I'S Model 70 processing system. Both qualitative and quantitative processing techniques were employed to identify and describe the surface temperature patterns and ground water discharges into the river. Computer...

  10. Solar Construction Permitting Standards

    Broader source: Energy.gov [DOE]

    Owners of solar photovoltaic (PV) systems and solar water heating systems in Colorado are required to obtain a building permit before their systems may be installed. Permits are handled at the l...

  11. Solar Construction Permitting Standards

    Broader source: Energy.gov [DOE]

    Owners of solar photovoltaic (PV) systems and solar water heating systems in Arizona are required to obtain a building permit before their systems may be installed. Permits are handled at the...

  12. Plasma Kinetics in the Ethanol/Water/Air Mixture in "Tornado" Type Electrical Discharge

    E-Print Network [OSTI]

    Levko, D; Chernyak, V; Olszewski, S; Nedybaliuk, O

    2011-01-01T23:59:59.000Z

    This paper presents the results of a theoretical and experimental study of plasma-assisted reforming of ethanol into molecular hydrogen in a new modification of the "tornado" type electrical discharge. Numerical modeling clarifies the nature of the non-thermal conversion and explains the kinetic mechanism of nonequilibrium plasma-chemical transformations in the gas-liquid system and the evolution of hydrogen during the reforming as a function of discharge parameters and ethanol-to-water ratio in the mixture. We also propose a scheme of chemical reactions for plasma kinetics description. It is shown that some characteristics of the investigated reactor are at least not inferior to characteristics of other plasma chemical reactors.

  13. City of San Jose- Solar Hot Water Heaters and Photovoltaic Systems Permit Requirements

    Broader source: Energy.gov [DOE]

    Building, Planning and Electrical Permits are required for Photovoltiac (PV) systems installed in San Jose. In most cases, PV systems must also undergo a Building Plan Review and an Electrical...

  14. Title 40 CFR 122.26 Storm water discharges | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries PvtStratosolarTharaldson EthanolTillson,OpenOpen EnergyR. 297water discharges Jump

  15. Locating Ground-Water Discharge in the Hanford Reach of the Columbia River

    SciTech Connect (OSTI)

    Lee, D.R.; Geist, D.R.; Saldi, K.; Hartwig, D.; Cooper, T.

    1997-03-01T23:59:59.000Z

    A bottom-contacting probe for measuring electrical conductivity at the sediment-water interface was used to scan the bed of the Columbia River adjacent to the Hanford Site in southeast Washington State during a 10-day investigation. Four river-sections, each about a kilometer in length, were scanned for variations in electrical conductivity. The probe was towed along the riverbed at a speed of 1 m/s and is position was recorded using a Global Positioning System. The bottom tows revealed several areas of elevated electrical conductivity. Where these anomalies were relatively easy to access, piezometers were driven into the riverbed and porewater electrical conductivity ranged from 111 to 150 uS/cm. The piezometers, placed in electrical conductivity “hotspots,” yielded chemical or isotopic data consistent with previous analyses of water taken from monitoring wells and visible shoreline seeps. Tritium, nitrate, and chromium exceeded water quality standards in some porewaters. The highest tritium and nitrate levels were found near the Old Hanford Townsite at 120,000 pCi/L (+ 5,880 pCi/L total propagated analytical uncertainty) and ug/L (+ 5,880 ug/L), respectively. The maximum chromium (total and hexavalent) levels were found near 100-H reactor area where unfiltered porewater total chromium was 1,900 ug/L (+ 798 ug/L) and hexavalent chromium was 20 ug/L. The electrical conductivity probe provided rapid, cost-effective reconnaissance for ground-water discharge areas when used in combination with conventional piezometers. It may be possible to obtain quantitative estimates of both natural and contaminated ground-water discharge in the Hanford Reach with more extensive surveys of river bottom.

  16. EPA - National Pollutant Discharge Elimination System General...

    Open Energy Info (EERE)

    General Permit for Discharges from Construction Activities Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: EPA -...

  17. New Mexico Surface Water Quality Bureau Federal Dredge and Fill Permits

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania:Information Operating Permit ListFacility | Openwebpage |

  18. 300 area TEDF permit compliance monitoring plan

    SciTech Connect (OSTI)

    BERNESKI, L.D.

    1998-11-20T23:59:59.000Z

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

  19. Resource Management Services: Water Regulation, Part 600: Applications for Licenses and Preliminary Permits Under the Water Power Act (New York)

    Broader source: Energy.gov [DOE]

    These regulations provide instructions for applications proposing the construction, repair, or operation of hydropower sources. Applications are reviewed by the Water Power and Control Commission.

  20. Annual Hanford Site environmental permitting status report

    SciTech Connect (OSTI)

    Sonnichsen, J.C.

    1998-09-17T23:59:59.000Z

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, `best efforts` means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for the Hanford Facility is addressed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Pursuant to the Tri-Party Agreement, a single RCRA permit was issued by Ecology and the EPA to cover the Hanford Facility. The RCRA Permit, through the permit modification process, eventually will incorporate all TSD units.

  1. Storm water pollution prevention plans

    SciTech Connect (OSTI)

    Rossmiller, R.L. (HDR Engineering, Inc., Bellevue, WA (United States))

    1993-03-01T23:59:59.000Z

    National Pollutant Discharge Elimination System (NPDES) general permit applications for industrial storm water discharge were to have been filed by October 1992. The Environmental Protection Agency (EPA) and state agencies are now issuing permits based on these applications. One compliance aspect of the permits is the Storm Water Pollution Prevention Plan (SWP3). The plan must identify the facility's potential sources of storm water pollution and develop and implement best management practices (BMPs) to reduce pollutants in storm water runoff. The objectives of the NPDES storm water program are to eliminate illegal dumping and illicit connections, and to reduce pollutants in industrial storm water discharge. These regulations require industry to develop detailed facility site maps, and describe the types, amounts and locations of potential pollutants. Based on this information, industry can develop and implement best management practices to reduce pollutants in storm water runoff.

  2. Effect of Title V air permitting on pipeline operations

    SciTech Connect (OSTI)

    Bost, R.C.; Donnan, G.T. [ERM-Southwest, Inc., Houston, TX (United States)

    1995-12-31T23:59:59.000Z

    Pursuant to the passage of the Clean Air Act Amendments of 1990, the US Environmental Protection Agency has promulgated what are known as Title V permitting requirements for major sources of air pollutants, including pipeline operations. In contrast to most existing air permitting programs, the new Title V regulations will require periodic certification of compliance with applicable air regulations. In the same way that water dischargers report their own discharge violations to regulatory agencies pursuant to the NPDES permitting system, Title V permittees must implement an acceptable monitoring program and similarly report violations of permit conditions or applicable air regulations. Only those facilities whose potential emissions are less than or can be controlled to be less than certain regulatory limits will be exempt from standard Title V permitting. If a facility`s throughput or the concentration levels of certain volatile toxic levels in a particular crude or natural gas were to exceed corresponding regulatory limits, then the facility could be in violation. If an operator were to expand a field, then the changes in the gathering system and emission levels could constitute a violation. Constraints on operations can be avoided by careful strategizing of an operator`s Title V permit application.

  3. Storm Water Individual Permit.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary900Steep SlopeStochastic WeeklyStores Catalog The

  4. UPDES General Permit for Discharges from Construction Activities (Permit

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown of Ladoga, IndianaTurtle Airships JumpTypefor Africa | OpenSolar ManagmentNo.

  5. Multibubble plasma production and solvent decomposition in water by slot-excited microwave discharge

    SciTech Connect (OSTI)

    Ishijima, T.; Hotta, H.; Sugai, H.; Sato, M. [Plasma Nanotechnology Research Center, Nagoya University, Furo-cho, Chikusa-ku, Nagoya 464-8603 (Japan); Honda Electronics Corporation, 20 Oyamazuka, Oiwa-cho, Toyohashi 441-3193 (Japan)

    2007-09-17T23:59:59.000Z

    Intense microwaves are injected from a slot antenna into water partly filling a metal vessel. When the vessel is evacuated to saturated vapor pressure ({approx}5x10{sup 3} Pa) of water, microwave breakdown gives rise to plasmas in many bubbles in the boiling water. Gas bubbling technique enables production of multibubble plasmas in water even at atmospheric pressure. Optical emissions from the exited species are investigated to identify radical species in water. In order to demonstrate application to purification of polluted water, methylene blue and trichlorethylene solution in 8 l water were observed to rapidly decrease with multibubble plasma treatment.

  6. Site Discharge Pollution Prevention Plan (SDPPP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SDPPP Individual Permit: Site Discharge Pollution Prevention Plan (SDPPP) The 2012 SDPPP update fully incorporates all changes made during the year and reflects changes projected...

  7. NMED - Discharge Permit Application | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania: Energy Resources JumpNEF AdvisorsState of New Mexico ||ROW-

  8. Title 40 CFR 122 EPA Administered Permit Programs: The National...

    Open Energy Info (EERE)

    Administered Permit Programs: The National Pollutant Discharge Elimination System Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal...

  9. Regulatory Issues Affecting Management of Produced Water from Coal Bed Methane Wells

    SciTech Connect (OSTI)

    Veil, John A.

    2003-03-03T23:59:59.000Z

    This paper describes the existing national discharge regulations, the ways in which CBM produced water is currently being managed, the current CBM discharge permitting practices, and how these options might change as the volume of produced water increases because of the many new wells being developed.

  10. NPDES Individual Permit for Industrial Facilities - Mail Merge...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY FROM FABRICATED METAL PRODUCTS INDUSTRY......44 I. CONTENTS OF PLAN. ......

  11. Storm-water management for construction activities. Developing pollution prevention plans and best management practices

    SciTech Connect (OSTI)

    Not Available

    1992-09-01T23:59:59.000Z

    The manual provides industrial facilities with comprehensive guidance on the development of storm water pollution prevention plans and identification of appropriate Best Management Practices (BMPs). It provides technical assistance and support to all facilities subject to pollution prevention requirements established under National Pollutant Discharge Elimination System (NPDES) permits for storm water point source discharges. EPA's storm water program significantly expands the scope and application of the existing NPDES permit system for municipal and industrial process wastewater discharges. It emphasizes pollution prevention and reflects a heavy reliance on BMPs to reduce pollutant loadings and improve water quality. The manual provides essential guidance in both of these areas.

  12. Storm-water management for industrial activities. Developing pollution prevention plans and best management practices

    SciTech Connect (OSTI)

    Not Available

    1992-09-01T23:59:59.000Z

    The manual provides industrial facilities with comprehensive guidance on the development of storm water pollution prevention plans and identification of appropriate Best Management Practices (BMPs). It provides technical assistance and support to all facilities subject to pollution prevention requirements established under National Pollutant Discharge Elimination System (NPDES) permits for storm water point source discharges. EPA's storm water program significantly expands the scope and application of the existing NPDES permit system for municipal and industrial process wastewater discharges. It emphasizes pollution prevention and reflects a heavy reliance on BMPs to reduce pollutant loadings and improve water quality. The manual provides essential guidance in both of these areas.

  13. The Design of an Emissions Permit Market for RECLAIM: A Holistic Approach

    E-Print Network [OSTI]

    Goldenberg, Evan

    1993-01-01T23:59:59.000Z

    note 7, at 31. EMISSIONS PERMIT MARKET DESIGN uities maya transferable discharge permit * M.S.E.H.S. ( EnvironmentalTransferable Dis- charge Permits for Control of BOD: An

  14. Modeling the Physical and Biochemical Influence of Ocean Thermal Energy Conversion Plant Discharges into their Adjacent Waters

    SciTech Connect (OSTI)

    PAT GRANDELLI, P.E.; GREG ROCHELEAU; JOHN HAMRICK, Ph.D.; MATT CHURCH, Ph.D.; BRIAN POWELL, Ph.D.

    2012-09-29T23:59:59.000Z

    This paper describes the modeling work by Makai Ocean Engineering, Inc. to simulate the biochemical effects of of the nutrient-enhanced seawater plumes that are discharged by one or several 100 megawatt OTEC plants. The modeling is needed to properly design OTEC plants that can operate sustainably with acceptably low biological impact. In order to quantify the effect of discharge configuration and phytoplankton response, Makai Ocean Engineering implemented a biological and physical model for the waters surrounding O`ahu, Hawai`i, using the EPA-approved Environmental Fluid Dynamics Code (EFDC). Each EFDC grid cell was approximately 1 square kilometer by 20 meters deep, and used a time step of three hours. The biological model was set up to simulate the biochemical response for three classes of organisms: Picoplankton (< 2 um) such as prochlorococccus, nanoplankton (2-20 um), and microplankton (> 20 um) e.g., diatoms. The dynamic biological phytoplankton model was calibrated using chemical and biological data collected for the Hawaii Ocean Time Series (HOTS) project. Peer review of the biological modeling was performed. The physical oceanography model uses boundary conditions from a surrounding Hawai'i Regional Ocean Model, (ROM) operated by the University of Hawai`i and the National Atmospheric and Oceanic Administration. The ROM provided tides, basin scale circulation, mesoscale variability, and atmospheric forcing into the edges of the EFDC computational domain. This model is the most accurate and sophisticated Hawai'ian Regional Ocean Model presently available, assimilating real-time oceanographic observations, as well as model calibration based upon temperature, current and salinity data collected during 2010 near the simulated OTEC site. The ROM program manager peer-reviewed Makai's implementation of the ROM output into our EFDC model. The supporting oceanographic data was collected for a Naval Facilities Engineering Command / Makai project. Results: The model was run for a 100 MW OTEC Plant consisting of four separate ducts, discharging a total combined flow rate of 420 m3/s of warm water and 320 m3/s of cold water in a mixed discharge at 70 meters deep. Each duct was assumed to have a discharge port diameter of 10.5m producing a downward discharge velocity of about 2.18 m/s. The natural system, as measured in the HOTS program, has an average concentration of 10-15 mgC/m3. To calibrate the biological model, we first ran the model with no OTEC plant and varied biological parameters until the simulated data was a good match to the HOTS observations. This modeling showed that phytoplankton concentration were patchy and highly dynamic. The patchiness was a good match with the data variability observed within the HOTS data sets. We then ran the model with simulated OTEC intake and discharge flows and associated nutrients. Directly under the OTEC plant, the near-field plume has an average terminal depth of 172 meters, with a volumetric dilution of 13:1. The average terminal plume temperature was 19.8oC. Nitrate concentrations are 1 to 2 umol/kg above ambient. The advecting plume then further dilutes to less than 1 umol/kg above ambient within a few kilometers downstream, while remaining at depth. Because this terminal near-field plume is well below the 1% light limited depths (~120m), no immediate biological utilization of the nutrients occurs. As the nitrate is advected and dispersed downstream, a fraction of the deep ocean nutrients (< 0.5 umol/kg perturbation) mix upward where they are utilized by the ambient phytoplankton population. This occurs approximately twenty-five kilometers downstream from the plant at 110 - 70 meters depth. For pico-phytoplankton, modeling results indicate that this nutrient perturbation causes a phytoplankton perturbation of approximately 1 mgC/m3 (~10% of average ambient concentrations) that covers an area 10x5 km in size at the 70 to 90m depth. Thus, the perturbations are well within the natural variability of the system, generally corresponding to a 10 to 15% increase above the a

  15. Rotordynamics/discharge water-hammer coupling via seals in pump rotordynamics

    E-Print Network [OSTI]

    Zhang, Kaikai

    2004-09-30T23:59:59.000Z

    A new closed-loop frequency-domain model is developed to incorporate the water hammer effect with pump rotordynamics, in order to investigate the sub-synchronous instability problem observed in a field pump. Seal flow-rate perturbations due...

  16. The Steepest Hurdle in Obtaining a Clean Water Act Section 404 Permit: Complying with EPA's 404 (b)(1) Guidelines' Least Environmentally Damaging Practicable Alternative Requirement

    E-Print Network [OSTI]

    Schutz, Jon

    2005-01-01T23:59:59.000Z

    hurdle" in obtaining a 404 permit. Uram, supra note 1, atFindings, Old Cutler Bay Permit 404(q) Elevation (1990) 4 [Army Corps of Engineers, Permit Elevation, Hartz Mountain

  17. Tier 1 ecological evaluation of proposed discharge of dredged material from Oakland Harbor into ocean waters

    SciTech Connect (OSTI)

    Shreffler, D.K.; Thorn, R.M.; Walls, B.E.; Word, J.Q. [Battelle/Marine Sciences Lab., Sequim, WA (United States)

    1994-01-01T23:59:59.000Z

    The Water Resources Development Act of 1986 (Public Law 99--662) authorized the U.S. Army Corps of Engineers (USACE) -- San Francisco District, to accommodate larger, deeper draft vessels in Oakland inner and Outer Harbors by deepening and widening the existing navigation channel, and providing turning basins and maneuvering areas in Oakland inner Harbor. The suitability of the resulting dredged material for disposal into ocean waters was subject to the procedures of the 1991 Testing Manual, Evaluation of Dredged Material Proposed for Ocean Disposal, known as the ``Green Book``. The Green Book provides a tiered approach for testing the suitability of dredged materials through chemical, physical, and biological evaluations. The first level of investigation, or Tier 1 evaluation, is used to determine whether a decision on LPC compliance can be made on the basis of readily available information. The Tier 1 report primarily summarizes existing information on sediment contamination and toxicity potential, identifies contaminants of concern, and determines the need for further testing. To assist the USACE in determining the suitability of dredged material from Oakland inner and Outer Harbors for ocean disposal, Battelle/Marine Sciences Laboratory prepared this Tier 1 report based upon information and data provided by USACE. Because this Tier 1 report originated well after an LPC determination was made to require testing of project sediments in Tier 3, the primary purpose of this report was to identify contaminants of concern (if any) in that particular dredged material. In addition, this Tier 1 report summarizes available information on chemical, physical, and biological characterization of the sediments in Oakland inner and Outer Harbors.

  18. Storm water pollution prevention plan for the Oak Ridge Y-12 Plant

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    The Environmental Protection Agency (EPA) published the final storm water regulation on November 16, 1990. The storm water regulation is included in the National Pollutant Discharge Elimination System (NPDES) regulations. An NPDES permit was issued for the Y-12 Plant on April 28, 1995, and was effective on July 1, 1995. The permit requires that a Storm Water Pollution Prevention Plan (SWP3) be developed by December 28, 1995, and be fully implemented by July 1, 1996; this plan has been developed to fulfill that requirement. The outfalls and monitoring points described in this plan contain storm water discharges associated with industrial activities as defined in the NPDES regulations. For storm water discharges associated with industrial activity, including storm water discharges associated with construction activity, that are not specifically monitored or limited in this permit, Y-12 Plant personnel will meet conditions of the General Storm Water Rule 1200-4-10. This document presents the programs and physical controls that are in place to achieve the following objectives: ensure compliance with Section 1200-4-10-.04(5) of the TDEC Water Quality Control Regulations and Part 4 of the Y-12 Plant NPDES Permit (TN0002968); provide operating personnel with guidance relevant to storm water pollution prevention and control requirements for their facility and/or project; and prevent or reduce pollutant discharge to the environment, in accordance with the Clean Water Act (CWA) and the Tennessee Water Quality Control Act.

  19. Wastewater Construction and Operation Permits (Iowa)

    Broader source: Energy.gov [DOE]

    These regulations describe permit requirements for the construction and operation of facilities treating wastewater, and provide separation distances from other water sources.

  20. WAC - 173 - 220 - National Pollutant Discharge Elimination System...

    Open Energy Info (EERE)

    Reference LibraryAdd to library Legal Document- RegulationRegulation: WAC - 173 - 220 - National Pollutant Discharge Elimination System Permit ProgramLegal Published NA Year...

  1. EPA's Priorities for Clean Water Act Programs

    E-Print Network [OSTI]

    Nebraska-Lincoln, University of

    , industrial, construction) Pesticide application to water Discharges from Vessels CWA 309 Enforcement; deter non- compliance on an industry-wide basis Aggressively go after pollution problems that make) · State lead, with EPA approval and backstop responsibility Permitting Programs National Pollutant

  2. Presidential Permits | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presidential Permits Below is a listing of all the presidential permits grouped by Canada and Mexico. View the Presidental Permits - Mexico View the Presidential Permits -...

  3. Individual Permit for Storm Water

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItemResearch > The Energy Materials Center at CornellOf Smart Cities

  4. Federal Environmental Permitting Handbook. Environmental Guidance

    SciTech Connect (OSTI)

    Not Available

    1991-05-01T23:59:59.000Z

    The handbook consists of eight chapters addressing permitting and licensing requirements under the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986 (CERCLA/SARA), the Atomic Energy Act (AEA), the Clean Air Act (CAA), the Clean Water Act (CWA), the Federal Insectide, Fungicide, and Rodenticide Act (FIFRA), the Safe Drinking Water Act (SDWA), and the Toxic Substances Control Act (TSCA). Each chapter consists of: (1) an introduction to the statute and permitting requirements; (2) a diagram illustrating the relationship between permitting requirements under the statute being discussed and permitting requirements from other environmental statutes which may have to be addressed when applying for a particular permit (e.g., when applying for a RCRA permit, permits and permit applications under the CWA, CAA, SDWA, etc. would have to be listed in the RCRA permit application); and, (3) a compilation of the permitting requirements for the regulatory program resulting from the statute. In addition, the Handbook contains a permitting keyword index and a listing of hotline telephone numbers for each of the statutes.

  5. 300 area TEDF NPDES Permit Compliance Monitoring Plan

    SciTech Connect (OSTI)

    Loll, C.M.

    1995-09-05T23:59:59.000Z

    This document presents the 300 Area Treated Effluent Disposal Facility (TEDF) National Pollutant Discharge Elimination System (NPDES) Permit Compliance Monitoring Plan (MP). The MP describes how ongoing monitoring of the TEDF effluent stream for compliance with the NPDES permit will occur. The MP also includes Quality Assurance protocols to be followed.

  6. Exposure and effects of oilfield brine discharges on western sandpipers (Calidris mauri) in Nueces Bay, Texas

    SciTech Connect (OSTI)

    Rattner, B.A.; Melancon, M.J. [National Biological Survey, Laurel, MD (United States); Capizzi, J.L. [Texas A& M Univ., College Station, TX (United States); King, K.A. [Fish and Wildlife Service, Phoenix, AZ (United States); LeCaptain, L.J. [Fish and Wildlife Service, Spokane, WA (United States)

    1995-05-01T23:59:59.000Z

    Discharge of oilfield brines into fresh and estuarine waters is a common disposal practice in Texas. Petroleum crude oil (PCO) extraction from underground stores includes the removal of a significant amount of water along with the oil. Several methods may be used to separate the oil and water fractions, including tank batteries, heat separation, and skimming ponds. Disposal of the resultant produced water (oilfield brine) may be accomplished by deep-well injection or discharge to surface waters. In Texas, an estimated 766,000 barrels of oilfield brine were discharged daily into tidal waters in 1979. The maximum concentration for oil and grease in these discharges permitted by the Texas Railroad Commission is 25 ppm. Several studies have shown that oilfield brines are toxic to a wide range of marine life, yet little is known about their effects on birds and mammals. Exposure to petroleum in oilfield wastes could evoke toxicological effects in some waterbird species. Avian responses to PCO exposure are highly variable, including cessation of growth, osmoregulatory impairment, endocrine dysfunction, hemolytic anemia, altered blood chemistry, cytochrome P450 induction, reduced reproductive success, and mortality. Oilfield brine discharges may soon be the largest and most pervasive source of contaminants entering Texas estuaries. Migratory and resident birds feeding in the vicinity of discharge sites may be ingesting food items contaminated with petroleum hydrocarbons, heavy metals and salts in sufficient quantities to evoke toxicity. The present study of wintering western sandpipers (Calidris mauri) that feed and roost near discharge sites sought to examine oilfield brine exposure and effects through quantification of contaminant burdens, morphological characteristics, and cytochrome P450-associated monooxygenase activities. 20 refs., 2 tabs.

  7. DISCOUNTED EVENT PERMIT REQUEST

    E-Print Network [OSTI]

    DISCOUNTED EVENT PERMIT REQUEST Discounted daily parking rates are available for CSM events where or the daily scratch off permits: COMMUTER LOTS: $3.00 / day GENERAL LOTS: $4.00 / day Please e-mail or drop

  8. Solar Permitting Law (Oregon)

    Broader source: Energy.gov [DOE]

    With the passage of HB 3516 in June 2011, solar permit application approval is a "ministerial function", provided a system meets certain guidelines. To qualify for this simplified permitting...

  9. Regulations and Permits Related to Dams (Vermont)

    Broader source: Energy.gov [DOE]

    Vermont law requires a permit, or a dam order, for the construction, alteration, or removal of dams impounding more than 500,000 cubic feet of water, including any accumulated sediments. Dam...

  10. Aquatic Habitat Protection Permit (Saskatchewan, Canada)

    Broader source: Energy.gov [DOE]

    The Environmental Management and Protection Act, 2002 (EMPA) provides for the protection of aquatic habitat and states that a permit is required: to alter the bed, bank or boundary of any water...

  11. ENVIRONMENTAL ASSESSMENT FOR THE NPDES STORM WATER COMPLIANCE ALTERNATIVES AT THE SRS

    SciTech Connect (OSTI)

    Shedrow, C

    2006-11-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) prepared this environmental assessment (EA) to evaluate the potential environmental impacts associated with proposed and alternative actions to achieve water quality permit compliance at 38 storm water outfalls located at the Savannah River Site (SRS) (Figure 1-1). Effluent monitoring data indicates that some of these outfalls may not presently comply with new National Pollutant Discharge Elimination System (NPDES) Storm Water General Permit effluent standards that became effective July 1, 2005 (SCR000000). The NPDES permit requires that best management practices (BMPs) be implemented and maintained, as necessary, to ensure that storm water discharges at SRS do not cause or contribute to the contravention of applicable state water quality standards (WQS).

  12. Hazardous Waste Transporter Permits (Connecticut)

    Broader source: Energy.gov [DOE]

    Transportation of hazardous wastes into or through the State of Connecticut requires a permit. Some exceptions apply. The regulations provide information about obtaining permits and other permit...

  13. Utah Code Ann. § 19-5-107: Discharge of pollutants unlawful...

    Open Energy Info (EERE)

    Ann. 19-5-107: Discharge of pollutants unlawful -- Discharge permit required Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute:...

  14. Growth and mortality of the oyster, Crassostrea virginica (Gmelin) in an electric generating station cooling lake receiving heated discharge water

    E-Print Network [OSTI]

    Oja, Robert Kenneth

    1974-01-01T23:59:59.000Z

    throughout the tudy. STUDY ARZA AND ?)vTHODS Studg Area Thi. study was conducted at the Houston Lighting and Power Camp- y's Cedar Bayou Generating Station in Baytown, Texas. The plant comprises two 750-mcg watt units with individual water circulating... group, was located at the . intake canal of the power plant. The remaining four stations were located within the cooling lake (I'ig. 2, p. ll ). The station oositions were selected to encompass th maximum water temperature range within the lake. Prior...

  15. CCS Project Permit Acquisition Protocols

    SciTech Connect (OSTI)

    Lee, Si-Yong; Zaluski, Wade; Matthews, Vince; McPherson, Brian

    2013-06-30T23:59:59.000Z

    Geologic carbon storage projects require a vast range of permits prior to deployment. These include land-access permits, drilling permits, seismic survey permits, underground injection control permits, and any number of local and state permits, depending on the location of the project. For the “Characterization of Most Promising Sequestration Formations in the Rocky Mountain Region” (RMCCS) project in particular, critical permits included site access permits, seismic survey permits, and drilling permits for the characterization well. Permits for these and other activities were acquired either prior to or during the project.

  16. Assessment of water exchange between a discharge region and the open sea e A comparison of different

    E-Print Network [OSTI]

    Döös, Kristofer

    by the Swedish Nuclear Fuel and Waste Management Co. (SKB) as possible sites for long-term storage of nuclear of radio-nuclides in the environment and exposure and risk to humans. Should a radioactive particle enter-nuclides through the sea floor from an underground repository of nuclear waste. Water exchange rates between

  17. Ecosystem under Pressure: Examining the Phytoplankton Community in the High Ballast Water Discharge Environment of Galveston Bay, Texas (USA)

    E-Print Network [OSTI]

    Steichen, Jamie L

    2013-01-15T23:59:59.000Z

    water from port to port (Anderson, 2009). The combination of larger ballast tanks, ever increasing international commerce and shorter transit times, has synergistically contributed to the increasing rate of successful invasions in coastal bays... and Gymnodinium catenatum (found in POH June 2007), native to Japan, was introduced to Australia (Hallegraeff and Bolch, 1991). Viable cysts of the toxic species of Alexandrium were identified and cultured from multiple ballast tanks of vessels traveling from...

  18. Ecological evaluation of proposed discharge of dredged material from Oakland Harbor into ocean waters (Phase 2 of -42-foot project)

    SciTech Connect (OSTI)

    Word, J.Q.; Ward, J.A.; Strand, J.A.; Kohn, N.P.; Squires, A.L. (Battelle Marine Research Lab., Sequim, WA (USA))

    1990-09-01T23:59:59.000Z

    The US Army Corps of Engineers (USACE), San Francisco District, was authorized by the Water Resources Development Act of 1986 to deepen and widen the navigation channels of Inner and Outer Oakland Harbor, California, to accommodate modern deep-draft vessels. The recommended plan consists of deepening the harbor channels from the presently authorized water depth of {minus}35 ft mean lower low water (MLLW) to {minus}42 ft MLLW and supplying the harbor with adequate turning basins and berthing areas. Offshore ocean disposal of the dredged sediment is being considered, provided there is no evident of harmful ecological effects. It harmful ecological effects are not evident then the appropriate certifications from state environmental quality agencies and concurrence from the Environmental Protection Agency can be obtained to allow disposal of sediment. To help provide the scientific basis for determining whether Oakland Harbor sediments are suitable for offshore disposal, the Battelle/Marine Sciences Laboratory (MSL) collected sediment cores from 23 stations in Inner and Outer Oakland Harbor, evaluated these sediment cores geologically, performed chemical analyses for selected contaminants in sediments, conducted a series of solid phase toxicity tests with four sensitive marine invertebrates and assessed the bioaccumulation potential of sediment-associated contaminants in the tissues of Macoma Nasuta. 43 refs., 26 figs., 61 tabs.

  19. Hazardous Waste Facility Permit Public Comments to Community...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PMRs, semi-annual meetings (e.g., CMRR and storm water permit meetings), Northern New Mexico Citizens' Advisory Board meetings, RACER, New Mexico Community Foundation FEED...

  20. Generation of high-current electron beam in a wide-aperture open discharge

    SciTech Connect (OSTI)

    Bokhan, P. A.; Zakrevsky, Dm. E.; Gugin, P. P. [A. V. Rzhanov Institute of Semiconductor Physics, Siberian Branch of the Russian Academy of Sciences, prospekt Lavrent'eva 13, Novosibirsk 630090 (Russian Federation)

    2011-10-15T23:59:59.000Z

    In the present study, it was examined generation of nanosecond-duration electron-beam (EB) pulses by a wide-aperture open discharge burning in helium or in a mixture of helium with nitrogen and water vapor. In the experiments, a discharge cell with coaxial electrode geometry, permitting radial injection of the electron beam into operating lasing medium, was used, with the cathode having radius 2.5 cm and length 12 cm. It was shown possible to achieve an efficient generation of a high-intensity electron beam (EB pulse power {approx}250 MW and EB pulse energy up to 4 J) in the kiloampere range of discharge currents (up to 26 kA at {approx}12 kV discharge voltage). The current-voltage characteristics of the discharge proved to be independent of the working-gas pressure. The existence of an unstable dynamic state of EB, conditioned by the presence of an uncompensated space charge accumulated in the discharge cell due to the exponential growth of the current in time during discharge initiation and the hyperbolic growth of current density in the direction towards the tube axis, was revealed. The obtained pulsed electron beam was used to excite the self-terminated laser on He 2{sup 1}P{sub 1}{sup 0}-2{sup 1}S{sub 0} transition. The oscillations developing in the discharge cell at high discharge currents put limit to the pumping energy and emissive power of the laser excited with the radially converging electron beam.

  1. WAC - 173 - 220 - National Pollutant Discharge Elimination System Permit

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown of Ladoga,planningFlowmeterUtah: Energydba VisionInformation straS.Program

  2. WAC - 173 - 226 - Waste Discharge General Permit Program | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown of Ladoga,planningFlowmeterUtah: Energydba VisionInformation| Open

  3. File:CDPHE Industrial Individual Wastewater Discharge Permit

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdf Jump to: navigation,Size of this preview: 463Map.pdfFile EditBreakoutCCS

  4. CDPHE Industrial Individual Wastewater Discharge Permit Application | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:Power LP Biomass Facilityin Charts Jump to: navigation, searchEnergy

  5. AZPDES General Permit for Stormwater Discharges Associated with

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcat 1AMEE Jump to: navigation, search40 -SolarCase Data

  6. Hawaii National Pollutant Discharge Elimination System (NPDES) Permit

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetec AG|Information OpenEI Reference

  7. Notice of Issuance of Stormwater Discharge Permit | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri: EnergyExcellence Seed LLCShores,Activity on Low Risk Sites |Notice of

  8. Vermont Individual Stormwater Discharge Permit Application | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown of Ladoga,planning methodologiesVenkataraya| Open Energy

  9. EPA - National Pollutant Discharge Elimination System General Permit for

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualPropertyd8c-a9ae-f8521cbb8489 No revision| Open Jump to: navigation, searchEMC3,webpage

  10. Operating Permits (New Jersey)

    Broader source: Energy.gov [DOE]

    The owner or operator of a facility subject to this article shall obtain and maintain an operating permit for the facility. The owner or operator of a facility subject to this article shall ensure...

  11. General Air Permits (Louisiana)

    Broader source: Energy.gov [DOE]

    Any source, including a temporary source, which emits or has the potential to emit any air contaminant requires an air permit. Facilities with potential emissions less than 5 tons per year of any...

  12. Wind Energy Permitting Standards

    Broader source: Energy.gov [DOE]

    All wind facilities larger than 0.5 megawatts (MW) that begin construction after July 1, 2010, must obtain a permit from any county in which the facility is located. Facilities must also obtain...

  13. Solar Construction Permitting Standards

    Broader source: Energy.gov [DOE]

    Two bills signed in 2012 place limits on the fees that cities, counties, cities and counties, and charter cities can charge for a solar permit. AB 1801 specifies that a local government cannot base...

  14. Washington Environmental Permit Handbook - Geothermal Drilling Permit |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide PermitInformationIsland: Energy ResourcesProcess |Open Energy

  15. Atmospheric pressure helium afterglow discharge detector for gas chromatography

    DOE Patents [OSTI]

    Rice, Gary (Gloucester, VA); D'Silva, Arthur P. (Ames, IA); Fassel, Velmer A. (Ames, IA)

    1986-05-06T23:59:59.000Z

    An apparatus for providing a simple, low-frequency electrodeless discharge system for atmospheric pressure afterglow generation. A single quartz tube through which a gas mixture is passed is extended beyond a concentric electrode positioned thereabout. A grounding rod is placed directly above the tube outlet to permit optical viewing of the discharge between the electrodes.

  16. Atmospheric pressure helium afterglow discharge detector for gas chromatography

    DOE Patents [OSTI]

    Rice, G.; D'Silva, A.P.; Fassel, V.A.

    1985-04-05T23:59:59.000Z

    An apparatus for providing a simple, low-frequency, electrodeless discharge system for atmospheric pressure afterglow generation. A single quartz tube through which a gas mixture is passed is extended beyond a concentric electrode positioned thereabout. A grounding rod is placed directly above the tube outlet to permit optical viewing of the discharge between the electrodes.

  17. Louisiana Title V General Permits

    SciTech Connect (OSTI)

    Boyer, B.E.; Neal, T.L.

    1995-12-31T23:59:59.000Z

    Title V of the Federal Clean Air Act Amendments of 1990 requires federal operating permits for all major sources of air pollution. In 1992, Title 40, Part 70 of the Code of Federal Regulations (40 CFR Part 70) codified the law s requirements. These federal regulations, entitled Operating Permit Program, define the minimum requirements for state administered operating permit programs. The intent of Title V is to put into one document all requirements of an operating permit. General Permits for oil and gas facilities may be preferred if the facility can comply with all permit requirements. If greater flexibility than allowed by the General Permit is required, then the facility should apply for an individual Title V permit. General Permits are designed to streamline the permitting process, shorten the time it takes to obtain approval for initial and modified permits. The advantages of the General Permit include reduced paperwork and greater consistency because the permits are standardized. There should be less uncertainty because permit requirements will be known at the time of application. Approval times for Initial and modified General Permits should be reduced. Lengthy public notice procedures (and possible hearings) will be required for only the initial approval of the General Permit and not for each applicant to the permit. A disadvantage of General Permits is reduced flexibility since the facility must comply with the requirements of a standardized permit.

  18. Wastewater Discharge Program (Maine)

    Broader source: Energy.gov [DOE]

    The wastewater discharge regulations require that a license be obtained for the discharge of wastewater to a stream, river, wetland, or lake of the state, or to the ocean. Typical discharges...

  19. Permit application modifications

    SciTech Connect (OSTI)

    NONE

    1995-11-01T23:59:59.000Z

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils.

  20. Pollution prevention and water conservation in metals finishing operations

    SciTech Connect (OSTI)

    O`Shaughnessy, J.; Clark, W. [Worcester Polytechnic Inst., MA (United States); Lizotte, R.P. Jr.; Mikutel, D. [Texas Instruments Inc., Attleboro, MA (United States)

    1996-11-01T23:59:59.000Z

    Attleboro, Massachusetts is the headquarters of the Materials and Controls Group of Texas Instruments Incorporated (Texas Instruments). In support of their activities, Texas Instruments operates a number of metal finishing and electroplating processes. The water supply and the wastewater treatment requirements are supplied throughout the facility from a central location. Water supply quality requirements varies with each manufacturing operation. As a result, manufacturing operations are classified as either high level or a lower water quality. The facility has two methods of wastewater treatment and disposal. The first method involves hydroxide and sulfide metals precipitation prior to discharge to a surface water. The second method involves metals precipitation, filtration, and discharge via sewer to the Attleboro WTF. The facility is limited to a maximum wastewater discharge of 460,000 gallons per day to surface water under the existing National Pollution Discharge Elimination System (NPDES) permit. There is also a hydraulic flow restriction on pretreated wastewater that is discharged to the Attleboro WTF. Both of these restrictions combined with increased production could cause the facility to reach the treatment capacity. The net effect is that wastewater discharge problems are becoming restrictive to the company`s growth. This paper reviews Texas Instruments efforts to overcome these restrictions through pollution prevention and reuse practices rather than expansion of end of pipe treatment methods.

  1. Constricted glow discharge plasma source

    DOE Patents [OSTI]

    Anders, Andre (Albany, CA); Anders, Simone (Albany, CA); Dickinson, Michael (San Leandro, CA); Rubin, Michael (Berkeley, CA); Newman, Nathan (Winnetka, IL)

    2000-01-01T23:59:59.000Z

    A constricted glow discharge chamber and method are disclosed. The polarity and geometry of the constricted glow discharge plasma source is set so that the contamination and energy of the ions discharged from the source are minimized. The several sources can be mounted in parallel and in series to provide a sustained ultra low source of ions in a plasma with contamination below practical detection limits. The source is suitable for applying films of nitrides such as gallium nitride and oxides such as tungsten oxide and for enriching other substances in material surfaces such as oxygen and water vapor, which are difficult process as plasma in any known devices and methods. The source can also be used to assist the deposition of films such as metal films by providing low-energy ions such as argon ions.

  2. Coastal Permit Program Rules (New Jersey)

    Broader source: Energy.gov [DOE]

    The Coastal Permit Program Rules provide the processes for permit reviews. They include details on what activities need permits; the qualifications for general permits or permits-by-rule; the...

  3. Portland's Residential Solar Permitting Guide

    Broader source: Energy.gov [DOE]

    This program guide outlines the application and review procedures for obtaining the necessary permit(s) to install a solar energy system for a new or existing residential building. The guide also...

  4. Reference: RGL 81-01 Subject: NATIONWIDE PERMIT-MAINTENANCE

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Reference: RGL 81-01 Subject: NATIONWIDE PERMIT-MAINTENANCE Title: MAINTENANCE DREDGING TO MAINTAIN EXISTING STRUCTURE IN SEC 10 WATERS DOES NOT AUTHORIZE MAINTENANCE DREDGING (1977 REGS). 1 applicable to maintenance dredging. 2. Nationwide permit 322.4(c) authorizes the repair, rehabilitation

  5. Regulatory and Permitting Issues

    SciTech Connect (OSTI)

    Larry Myer

    2005-12-01T23:59:59.000Z

    As part of the West Coast Regional Carbon Sequestration Partnership (WESTCARB), Terralog Technologies USA, Inc., reviewed current state and federal regulations related to carbon dioxide capture and storage within geologic formations and enhanced carbon uptake in terrestrial ecosystems. We have evaluated and summarized the current and possible future permitting requirements for the six states that comprise the West Coast Regional Partnership. Four options exist for CO{sub 2} injection into appropriate geologic formations, including storage in: (1) oil and gas reservoirs, (2) saline formations, (3) unmineable coal beds, and (4) salt caverns. Terrestrial CO{sub 2} sequestration involves improved carbon conservation management (e.g. reduction of deforestation), carbon substitution (e.g., substitution for fossil fuel-based products, energy conservation through urban forestry, biomass for energy generation), and improved carbon storage management (e.g., expanding the storage of carbon in forest ecosystems). The primary terrestrial options for the West Coast Region include: (1) reforestation of under-producing lands (including streamside forest restoration), (2) improved forest management, (3) forest protection and conservation, and (4) fuel treatments for the reduction of risk of uncharacteristically severe fires (potentially with associated biomass energy generation). The permits and/or contracts required for any land-use changes/disturbances and biomass energy generation that may occur as part of WESTCARB's activities have been summarized for each state.

  6. Preliminary investigation Area 12 fleet operations steam cleaning discharge area Nevada Test Site

    SciTech Connect (OSTI)

    NONE

    1996-07-01T23:59:59.000Z

    This report documents the characterization activities and findings of a former steam cleaning discharge area at the Nevada Test Site. The former steam cleaning site is located in Area 12 east of Fleet Operations Building 12-16. The characterization project was completed as a required condition of the ``Temporary Water Pollution Control Permit for the Discharge From Fleet Operations Steam Cleaning Facility`` issued by the Nevada Division of Environmental Protection. The project objective was to collect shallow soil samples in eight locations in the former surface discharge area. Based upon field observations, twelve locations were sampled on September 6, 1995 to better define the area of potential impact. Samples were collected from the surface to a depth of approximately 0.3 meters (one foot) below land surface. Discoloration of the surface soil was observed in the area of the discharge pipe and in localized areas in the natural drainage channel. The discoloration appeared to be consistent with the topographically low areas of the site. Hydrocarbon odors were noted in the areas of discoloration only. Samples collected were analyzed for bulk asbestos, Toxicity Characteristic Leaching Procedure (TCLP) metals, total petroleum hydrocarbons (TPHs), volatile organic compounds (VOCs), semi-volatile organic compounds (Semi-VOCs), and gamma scan.

  7. Comparative analysis of discharges into Lake Michigan, Phase I - Southern Lake Michigan.

    SciTech Connect (OSTI)

    Veil, J. A.; Elcock, D.; Gasper, J. R.; Environmental Science Division

    2008-06-30T23:59:59.000Z

    BP Products North America Inc. (BP) owns and operates a petroleum refinery located on approximately 1,700 acres in Whiting, East Chicago, and Hammond, Indiana, near the southern tip of Lake Michigan. BP provided funding to Purdue University-Calumet Water Institute (Purdue) and Argonne National Laboratory (Argonne) to conduct studies related to wastewater treatment and discharges. Purdue and Argonne are working jointly to identify and characterize technologies that BP could use to meet the previous discharge permit limits for total suspended solids (TSS) and ammonia after refinery modernization. In addition to the technology characterization work, Argonne conducted a separate project task, which is the subject of this report. In Phase I of a two-part study, Argonne estimated the current levels of discharge to southern Lake Michigan from significant point and nonpoint sources in Illinois, Indiana, and portions of Michigan. The study does not consider all of the chemicals that are discharged. Rather, it is narrowly focused on a selected group of pollutants, referred to as the 'target pollutants'. These include: TSS, ammonia, total and hexavalent chromium, mercury, vanadium, and selenium. In Phase II of the study, Argonne will expand the analysis to cover the entire Lake Michigan drainage basin.

  8. NPDES permit compliance and enforcement: A resource guide for oil and gas operators

    SciTech Connect (OSTI)

    NONE

    1998-12-01T23:59:59.000Z

    During the fall of 1996, the Interstate Oil and Gas Compact Commission sponsored sessions for government and industry representatives to discuss concerns about the National Pollution Discharge Elimination System (NPDES) program under the Clean Water Act. In January 1997, the NPDES Education/Communication/Training Workgroup (ECT Workgroup) was established with co-leaders from the Environmental Protection Agency (EPA) and industry. The ECT Workgroup`s purpose was to develop ideas that would improve communication between NPDES regulators and the oil and gas industry regarding NPDES compliance issues. The Workgroup focused on several areas, including permit compliance monitoring and reporting, enforcement activity and options, and treatment technology. The ECT Workgroup also discussed the need for materials and information to help NPDES regulatory agency personnel understand more about oil and gas industry exploration and extraction operations and treatment processes. This report represents a compendium of the ECT Workgroup`s efforts.

  9. Wetlands Standard Dredge and Fill Permit (New Hampshire)

    Broader source: Energy.gov [DOE]

    The purpose of the permits is to protect and preserve submerged lands under tidal and freshwaters and wetlands, both salt and fresh water, from unregulated alteration that would adversely affect...

  10. Broward County Online Solar Permitting (Florida)

    Broader source: Energy.gov [DOE]

    Broward County now offers Go SOLAR Online Permitting*, for rooftop solar photovoltaic system permitting. This online permitting system may be used for residential or low commercial properties that...

  11. Washington Environmental Permit Handbook - NPDES Construction...

    Open Energy Info (EERE)

    Washington Environmental Permit Handbook - NPDES Construction Stormwater General Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory...

  12. Presidential Permit Holders - Annual Reports | Department of...

    Energy Savers [EERE]

    Permit Holders - Annual Reports Presidential Permit Holders - Annual Reports Presidential permit holders are responsible for reporting the gross amount electric energy which flows...

  13. Manor Farm Permit Fees from 1 March 2014 Staff permits

    E-Print Network [OSTI]

    Doran, Simon J.

    -Site: low * £18.42 per month Car Share Permit * £82.00 per annum 2 or more University motorists sharing: Permit Type £ Notes Essential Use £201.00 per annum Car Share £80.00 per annum 2 or more University motorists sharing SOUPS Permits £8.75 for an allocation of 5 Maximum of 120 in an academic year University

  14. Air Pollution Control Permit to Construct and Permit to Operate...

    Broader source: Energy.gov (indexed) [DOE]

    Regulations Provider Department of Environmental Conservation The Air Pollution Control Division of the Vermont Department of Environmental Conservation requires a permit...

  15. WATER POLLUTION CONTROL GENERAL PERMIT GNEV93001

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMay 20102UNCLASSIFIEDOffice

  16. Storm Water Permits at LANL.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary900Steep SlopeStochastic WeeklyStores Catalog Thea Storm

  17. 300 Area TEDF NPDES Permit Compliance Monitoring Plan

    SciTech Connect (OSTI)

    Loll, C.M.

    1994-10-13T23:59:59.000Z

    This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures.

  18. Portland's Commercial Solar Permitting Guide

    Broader source: Energy.gov [DOE]

    This program guide outlines the application and review procedures for obtaining the necessary permits to install a solar energy system on a new or existing commercial building.

  19. Instream biological assessment of NPDES point source discharges at the Savannah River Site, 1997-1998

    SciTech Connect (OSTI)

    Specht, W.L.

    2000-02-28T23:59:59.000Z

    The Savannah River Site currently has 33 permitted NPDES outfalls that have been permitted by the South Carolina Department of Health an Environmental Control to discharge to SRS streams and the Savannah River. In order to determine the cumulative impacts of these discharges to the receiving streams, a study plan was developed to perform in-stream assessments of the fish assemblages, macroinvertebrate assemblages, and habitats of the receiving streams.

  20. Oscillations in glow discharges

    E-Print Network [OSTI]

    Prickett, Tom

    1950-01-01T23:59:59.000Z

    1950 CONTENTS Introduction ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 1 I. Review of Plasma Oscillations in Gas Discharges ? . . 2 II. Review of Relaxation Processes in Gas Discharges ? . 13 III. Report of Laboratory Investigation... 179540 LIST OF FIGURES Figure Page 1. Sketch of Plasma Space in which Electrons are given Displacements in the X-direction ? ? ? ? ? ? 5 2* Early Circuit Arrangement of Discharge Study ? ? ? ? ? 19 3, Flow Diagram of the Experimental System...

  1. Flexibility Premium in Marketable Permits

    E-Print Network [OSTI]

    Macrina, Andrea

    & solutions Problem: The problem of (air) pollution and the associated market failure had long been a part of Pollution Markets for permits Substitution Principle In a Nutshell The Premium The Model Solution Results Taschini London School of Economics Economics of Pollution Markets for permits Substitution Principle

  2. Waste-to-energy permitting sourcebook

    SciTech Connect (OSTI)

    Longwell, D.; Wegrecki, A.; Williams, D. (Bechtel Group, Inc., San Francisco, CA (United States))

    1992-10-01T23:59:59.000Z

    Environmental issues, regulatory processes and approvals important in obtaining a permit to construct and/or operate a waste-to-energy (WTE) facility are identified and discussed. Environmental issues include: (1) air emission levels, their control and potential impacts, (2) ash leachability, treatment, and disposal, (3) potential health risks from emissions, and (4) other issues such as need/benefit and public perception of WTE. Laws, regulations and approvals that can affect project development are identified and listed, and potential regulatory trends are discussed. A general permit acquisition plan is also presented. An analysis of environmental and regulatory data obtained from the literature, regulatory agencies, and specific projects is presented. California and Massachusetts, both with regulations generally more stringent than federal regulations and considered environmentally conservative, were selected for detailed state regulatory review. Two project case histories (Commerce Refuse-to-Energy (RTE) Project in California and SEMASS WTE Project in Massachusetts) were selected to illustrate: (1) how regulations are actually applied to a project, (2) project-specific permit and operating conditions, and (3) project-specific environmental issues. Modern WTE plots employ state-of-the-art air emission control technologies and strategies to reduce air emission is to levels below regulatory requirements and to reduce estimated health risks to within EPA's acceptable risk range. WTE ash leachate can exhibit hazardous waste characteristics, primarily lead and cadmium. However, modern landfills utilize liners and leachate collection systems to prevent infiltration of leachate into the groundwater supply. Modern WTE plants employ dry systems and have zero process wastewater discharge.

  3. Rating curves and estimation of average water depth at the upper Negro River based on satellite altimeter data and modeled discharges

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    1 Rating curves and estimation of average water depth at the upper Negro River based on satellite for 21 ``virtual gauge stations'' located at the upper Negro River (Amazon Basin, Brazil). A virtual station can be defined as any crossing of water body surface (i.e., large rivers) by radar altimeter

  4. The impact of Texas water quality laws on dairy firm profitability and survival

    E-Print Network [OSTI]

    Schmucker, John Francis

    1990-01-01T23:59:59.000Z

    Francis Schmucker, B. A. , Texas Tech University Chair of Advisory Committee: Dr. David J. Leatham Dairy waste management is one of the most important issues faced by Texas dairy producers. The Texas Water Commission regulations state there shall... be no discharge of waste and/or waste water into the waters of the State of Texas. The regulations also require a dairy having 250 or more milking cows to have a Texas Water Commission permit to operate. Dairy managers should therefore determine the least...

  5. Water Use Registration and Allocation (North Carolina)

    Broader source: Energy.gov [DOE]

    This rule states regulations for water withdrawals, permits required for withdrawals and water use during water droughts and emergencies. Self-supplied business and industrial water users subject...

  6. Longitudinal discharge laser electrodes

    DOE Patents [OSTI]

    Warner, B.E.; Miller, J.L.; Ault, E.R.

    1994-08-23T23:59:59.000Z

    The improved longitudinal discharge laser electrode with IR baffle includes an electrode made up of washers spaced along the laser axis in order to form inter-washer spaces for hollow cathode discharge to take place and for IR radiation to be trapped. Additional IR baffles can be placed between the electrode ann the window. 2 figs.

  7. Water Quality Program, Volume 1 (Alabama)

    Broader source: Energy.gov [DOE]

    This volume of the water quality program mainly deals with the National Pollutant Discharge Elimination System. National Pollutant Discharge Elimination System" or "(NPDES)" means the national...

  8. Solar Construction Permitting Standards (California)

    Broader source: Energy.gov [DOE]

    Two bills signed in 2012 place limits on the fees that cities, counties, cities and counties, and charter cities can charge for a solar permit. AB 1801 specifies that a local government cannot base...

  9. Solar Permitting & Inspection Webinar Series

    Office of Energy Efficiency and Renewable Energy (EERE)

    ICLEI Local Governments for Sustainability U.S.A. and the Interstate Renewable Energy Council, Inc. (IREC) present a series of three webinars on Solar Permitting & Inspection. As part of the U...

  10. Class 1 Permit Modification Notification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Bureau New Mexico Environment Department 2905 Rodeo Park Drive East, Bu il ding 1 Santa Fe, New Mexico 87505-6303 JUL 0 5 2011 Subject: Notification of a Class 1 Permit...

  11. Well Permits (District of Columbia)

    Broader source: Energy.gov [DOE]

    Well permits are required for the installation of wells in private and public space. Wells are defined as any trest hole, shaft, or soil excavation created by any means including, but not limited...

  12. Solar and Wind Permitting Laws

    Broader source: Energy.gov [DOE]

    New Jersey has enacted three separate laws addressing local permitting practices for solar and wind energy facilities. The first deals with solar and wind facilities located in industrial-zoned...

  13. Capacitor discharge pulse analysis.

    SciTech Connect (OSTI)

    Baker, Michael Sean; Griffiths, Stewart K.; Tanner, Danelle Mary

    2013-08-01T23:59:59.000Z

    Capacitors used in firing sets and other high discharge current applications are discharge tested to verify performance of the capacitor against the application requirements. Parameters such as capacitance, inductance, rise time, pulse width, peak current and current reversal must be verified to ensure that the capacitor will meet the application needs. This report summarizes an analysis performed on the discharge current data to extract these parameters by fitting a second-order system model to the discharge data and using this fit to determine the resulting performance metrics. Details of the theory and implementation are presented. Using the best-fit second-order system model to extract these metrics results in less sensitivity to noise in the measured data and allows for direct extraction of the total series resistance, inductance, and capacitance.

  14. Washington Environmental Permit Handbook - Dangerous Waste Treatment...

    Open Energy Info (EERE)

    Washington Environmental Permit Handbook - Dangerous Waste Treatment Storage Disposal Facility New Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Web...

  15. Operating Permits and Emission Fees (New Mexico)

    Broader source: Energy.gov [DOE]

    The New Mexico Environment Department's Air Quality Bureau processes permit applications for industries that emit pollutants to the air. The Permitting Section consists of three units, the Minor...

  16. Petroleum Pipeline Eminent Domain Permit Procedures (Georgia)

    Broader source: Energy.gov [DOE]

    The Petroleum Pipeline Eminent Domain Permit Procedures serve to protect Georgia's natural and environmental resources by requiring permits be issued by the Director of the Environmental Protection...

  17. Presidential Permits - Procedures | Department of Energy

    Office of Environmental Management (EM)

    Procedures Presidential Permits - Procedures Executive Order 12038 states that, before a Presidential permit may be issued, the action must be found to be consistent with the...

  18. Institutional impediments to using alternative water sources in thermoelectric power plants.

    SciTech Connect (OSTI)

    Elcock, D. (Environmental Science Division)

    2011-08-03T23:59:59.000Z

    This report was funded by the U.S. Department of Energy's (DOE's) National Energy Technology Laboratory (NETL) Existing Plants Research Program, which has an energy-water research effort that focuses on water use at power plants. This study complements the Existing Plants Research Program's overall research effort by evaluating water issues that could impact power plants. Obtaining adequate water supplies for cooling and other operations at a reasonable cost is a key factor in siting new and maintaining existing thermoelectric power plant operations. One way to reduce freshwater consumption is to use alternative water sources such as reclaimed (or recycled) water, mine pool water, and other nontraditional sources. The use of these alternative sources can pose institutional challenges that can cause schedule delays, increase costs, or even require plants to abandon their plans to use alternative sources. This report identifies and describes a variety of institutional challenges experienced by power plant owners and operators across the country, and for many of these challenges it identifies potential mitigating approaches. The information comes from publically available sources and from conversations with power plant owners/operators familiar with using alternative sources. Institutional challenges identified in this investigation include, but are not limited to, the following: (1) Institutional actions and decisions that are beyond the control of the power plant. Such actions can include changes in local administrative policies that can affect the use of reclaimed water, inaccurate growth projections regarding the amount of water that will be available when needed, and agency workloads and other priorities that can cause delays in the permitting and approval processes. (2) Developing, cultivating, and maintaining institutional relationships with the purveyor(s) of the alternative water source, typically a municipal wastewater treatment plant (WWTP), and with the local political organizations that can influence decisions regarding the use of the alternative source. Often a plan to use reclaimed water will work only if local politics and power plant goals converge. Even then, lengthy negotiations are often needed for the plans to come to fruition. (3) Regulatory requirements for planning and developing associated infrastructure such as pipelines, storage facilities, and back-up supplies that can require numerous approvals, permits, and public participation, all of which can create delays and increased costs. (4) Permitting requirements that may be difficult to meet, such as load-based discharge limits for wastewater or air emissions limitations for particulate matter (which will be in the mist of cooling towers that use reclaimed water high in dissolved solids). (5) Finding discharge options for cooling tower blowdown of reclaimed water that are acceptable to permitting authorities. Constituents in this wastewater can limit options for discharge. For example, discharge to rivers requires National Pollutant Discharge Elimination System (NPDES) permits whose limits may be difficult to meet, and underground injection can be limited because many potential injection sites have already been claimed for disposal of produced waters from oil and gas wells or waters associated with gas shale extraction. (6) Potential liabilities associated with using alternative sources. A power plant can be liable for damages associated with leaks from reclaimed water conveyance systems or storage areas, or with mine water that has been contaminated by unscrupulous drillers that is subsequently discharged by the power plant. (7) Community concerns that include, but are not limited to, increased saltwater drift on farmers fields; the possibility that the reclaimed water will contaminate local drinking water aquifers; determining the 'best' use of WWTP effluent; and potential health concerns associated with emissions from the cooling towers that use recycled water. (8) Interveners that raise public concerns about the potential for emissions of emergi

  19. Permit sellers, permit buyers S93 CLIMATE POLICY

    E-Print Network [OSTI]

    : China and Canada's roles in a global low-carbon society CHRIS BATAILLE*, JIANJUN TU, MARK JACCARD Energy, the abatement cost schedules of China and Canada are compared, and implications considered for carbon permit, coupled with supplementary regulations to address market failures. Keywords: Canada; carbon trading; China

  20. Prospects for river discharge and depth estimation through assimilation of swath-altimetry into a raster-based hydrodynamics

    E-Print Network [OSTI]

    Howat, Ian M.

    Prospects for river discharge and depth estimation through assimilation of swath water depth and discharge, reducing the discharge RMSE from 23.2% to 10.0% over an 84-day simulation. Clark, D. P. Lettenmaier, and D. E. Alsdorf (2007), Prospects for river discharge and depth estimation

  1. Use of microalgae to remove pollutants from power plant discharges

    DOE Patents [OSTI]

    Wilde, Edward W. (1833 Pisgah Rd., North Augusta, SC 29841); Benemann, John R. (2741 O'Harte, San Pablo, CA 94806); Weissman, Joseph C. (2086 N. Porpoise Pt. La., Vero Beach, FL 32963); Tillett, David M. (911-3 Coquina La., Vero Beach, FL 32963)

    1991-01-01T23:59:59.000Z

    A method and system for removing pollutants dissolved in the aqueous discharge of a plant, such as a power plant, from a body of water having known hydraulogy and physicochemical characteristics, the method comprising (a) modifying the hydraulic system of the body of water including use of physical barriers to define a zone in a portion of the body of water which zone includes the discharge point and where the water has a range of physicochemical characteristics; (b) selecting a large and preferably filamentous, planktonically growing strain of algae adapted to absorb the particular pollutants and genetically dominating algae at the physicochemical characteristics of the zone; (c) establishing a colony of the selected algal strain in the zone; (d) harvesting a portion of the colony; and (e) reinnoculating the zone near the discharge point with a fraction of the harvested portion. The fraction used for reinnoculation can be adjusted to balance the rate of pollutant removal to the rate of pollutant discharge.

  2. Permits

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    program, under Title V of the Clean Air Act, streamlines the way authorities regulate air pollution by consolidating all air pollution control requirements into a single,...

  3. Guide to Colorado Well Permits, Water Rights, and Water Administration |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetec AG| Open Energy InformationGettop Science TechnologyGuernsey

  4. Parking Options 2011/12 Reserved Permits

    E-Print Network [OSTI]

    Parking Options 2011/12 Reserved Permits A Reserved permit is $275 this fiscal year and is only available to faculty and staff through payroll deduction. Individuals issued a Reserved permit may park is completely full someone is parked illegally and Parking Services should be notified. Reserved permit holders

  5. Connecticut Rooftop Solar PV Permitting Guide

    Broader source: Energy.gov [DOE]

    The Connecticut Rooftop Solar PV Permitting Guide is a compilation of best practices and resources for solar PV permitting. The guide includes a summary of current codes and regulations affecting solar PV, best practices for streamlining the municipal permitting process, and tools to assist municipalities in creating a streamlined permit process for residential solar PV. Resources include a solar PV permit application, a structural review worksheet, an inspection checklist, and a model solar zoning ordinance.

  6. Regulations For State Administration Of The National Pollutant Discharge Elimination System (Arkansas)

    Broader source: Energy.gov [DOE]

    The Regulations For State Administration Of The National Pollutant Discharge Elimination System (NPDES) is created Pursuant to the provisions of the Arkansas Water and Air Pollution Control Act,...

  7. Longitudinal discharge laser baffles

    DOE Patents [OSTI]

    Warner, B.E.; Ault, E.R.

    1994-06-07T23:59:59.000Z

    The IR baffles placed between the window and the electrode of a longitudinal discharge laser improve laser performance by intercepting off-axis IR radiation from the laser and in doing so reduce window heating and subsequent optical distortion of the laser beam. 1 fig.

  8. Water Pollution Fee (Michigan)

    Broader source: Energy.gov [DOE]

    The Groundwater Program regulates discharge to groundwater under Part 31, Water Resources Protection, of the Natural Resources and Environmental Protection Act, 1994 PA 451 and Part 22 Rules....

  9. Environmental Compliance at the West Valley Demonstration Project: The Vitrification Permitting Program

    SciTech Connect (OSTI)

    L. C. Salvatori; C. B. Banzer; W. T. Watters

    1996-05-28T23:59:59.000Z

    The major environmental laws that apply to the West Valley Demonstration Project (WVDP) are the: Resource Conservation and Recovery Act (RCRA), Clean Air Act (CAA), Clean Water Act (CWA), Safe Drinking Water Act (SDWA), Toxic Substances Control Act (TSCA), National Environmental Policy Act (NEPA), and Emergency Planning and Community Right-To-Know Act (EPCRA). Regulations developed in accordance with these laws are administered by the New York State Department of Environmental Conservation (NYSDEC) and the U.S. Environmental Protection Agency (EPA) through state and federal programs, and regulatory requirements such as permitting. The Environmental Permits & Reports (EP&R) Group of the Environmental Affairs (EA) Department has the primary responsibility for developing a site-wide permitting program for the WVDP and obtaining the necessary permits. This report discusses the permits and the permitting process associated with the Vitrification Facility (VF).

  10. Washington Environmental Permit Handbook - Air Operating Permit | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide PermitInformationIsland: Energy ResourcesProcess | Open|

  11. Washington Environmental Permit Handbook - NPDES General Permit Coverage |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide PermitInformationIsland: Energy ResourcesProcess |OpenOpen

  12. Washington Environmental Permit Handbook - NPDES Individual Permit Coverage

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide PermitInformationIsland: Energy ResourcesProcess |OpenOpen|

  13. Spectra of Ions Produced by Corona Discharges

    SciTech Connect (OSTI)

    Skalny, J.; Hortvath, G. [Department of Experimental Physics, Comenius University, Mlynska dolina F-2, 84248 Bratislava (Slovakia); Mason, N. J. [Open University, Department of Physics and Astronomy, Walton Hall, Milton Keynes MK7 6AA (United Kingdom)

    2006-12-01T23:59:59.000Z

    A mass spectrometric study of ions extracted from both positive and negative DC corona discharges, initiated in point-to plane electrode system, has been carried out in ambient air at low air pressure (5 - 30) kPa. The average relative humidity of air was typically 40-50 %. Ions were extracted through a small orifice in the plane electrode into an intermediate gap where the low pressure prevented further ion-molecule reactions. Mass analysis of negative ions formed in the negative corona discharge using ambient air has shown that the yield of individual ions is strongly affected by trace concentrations of ozone, nitrogen oxides, carbon dioxide and water vapour. In dry air the CO{sub 3}{sup -} ion was found to be dominant. In presence of water this is converted very efficiently to cluster ions CO{sub 3}{sup -}{center_dot}(H{sub 2}O){sub n} containing one and more water molecules. The yield of O{sub 3}{sup -}{center_dot}(H{sub 2}O){sub n} clusters or core ions was found to be considerably lower than in some other studies at atmospheric pressure. The mass spectrum of ions extracted from drift region of a positive corona discharge was simpler being dominantly cluster ions H3O+{center_dot}(H2O)n most probably formed from O{sub 2}{sup +} ions, a two step process being active if water molecules are present in the discharge gap even at relatively low concentration.

  14. Market Power in Pollution Permit Markets

    E-Print Network [OSTI]

    Montero, Juan Pablo

    As with other commodity markets, markets for trading pollution permits have not been immune to market power concerns. In this paper, I survey the existing literature on market power in permit trading but also contribute ...

  15. Air Permitting for Stationary Sources (New Hampshire)

    Broader source: Energy.gov [DOE]

    The permitting system implements the permitting requirements of RSA 125-C and 125-I to regulate the operation and modification of new and existing stationary sources, area sources, and devices to...

  16. Priority Permit Processing for Green Buildings

    Broader source: Energy.gov [DOE]

    Hawaii Revised Statutes (HRS) §46-19.6 requires each county agency that issues building, construction, or development-related permits to establish a procedure for priority processing of permit...

  17. Construction Permits and Fees (New Mexico)

    Broader source: Energy.gov [DOE]

    Industries that wish to build or modify facilities that emit air pollutants (emissions) into the air must obtain an air quality permit prior to constructing. Thus, these permits are called...

  18. Powerful glow discharge excilamp

    DOE Patents [OSTI]

    Tarasenko, Victor F. (Tomsk, RU); Panchenko, Aleksey N. (Tomsk, RU); Skakun, Victor S. (Tomsk, RU); Sosnin, Edward A. (Tomsk, RU); Wang, Francis T. (Danville, CA); Myers, Booth R. (Livermore, CA); Adamson, Martyn G. (Danville, CA)

    2002-01-01T23:59:59.000Z

    A powerful glow discharge lamp comprising two coaxial tubes, the outer tube being optically transparent, with a cathode and anode placed at opposite ends of the tubes, the space between the tubes being filled with working gas. The electrodes are made as cylindrical tumblers placed in line to one other in such a way that one end of the cathode is inserted into the inner tube, one end of the anode coaxially covers the end of the outer tube, the inner tube penetrating and extending through the anode. The increased electrodes' surface area increases glow discharge electron current and, correspondingly, average radiation power of discharge plasma. The inner tube contains at least one cooling liquid tube placed along the axis of the inner tube along the entire lamp length to provide cathode cooling. The anode has a circumferential heat extracting radiator which removes heat from the anode. The invention is related to lighting engineering and can be applied for realization of photostimulated processes under the action of powerful radiation in required spectral range.

  19. Water Usage Law, Major Water Users (Missouri)

    Broader source: Energy.gov [DOE]

    Any water user with the capability to withdraw or divert 100,000 gallons or more per day from any stream, river, lake, well, spring or other water source must register and file for a permit for...

  20. California Solar Permitting Guidebook, Second Edition

    Broader source: Energy.gov [DOE]

    The California Solar Permitting Guidebook is a resource for local governments and permitting agencies to facilitate installation of small solar energy systems. By adopting its recommendations, local governments can reduce permit processing times and increase their output while facilitating local economic development.

  1. Solar Photovoltaic (PV) System Permit Application Checklist

    Broader source: Energy.gov [DOE]

    The Permit Application Checklist is intended to be used as a best management practice when establishing local government requirements for residential and commercial solar photovoltaic (PV) system permits. Local governments may modify this checklist to accommodate their local ordinances, code requirements, and permit procedures.

  2. Characterization of Section 404 Permit Mitigation Plans, Coastal Margin and Associated Watersheds, Upper Texas Coast

    E-Print Network [OSTI]

    Conkey, April A.

    2010-01-14T23:59:59.000Z

    (Corps) is directed to enforce Section 404 of the Clean Water Act (1975 amendment) by administering permits for development. Furthermore, a 1990 Memorandum of Agreement (MOA) between the Corps and the U.S. Environmental Protection Agency (EPA) proposed a...

  3. P\\procedure\\EU#13 Page 1 of 3 TITLE ANNUAL FACILITY PERMIT

    E-Print Network [OSTI]

    Fernandez, Eduardo

    such as water management districts, state agencies, or federal agencies. ATTACHMENT "A" Department of an individual permit for each alteration of an existing electrical, gas, mechanical, plumbing or interior non

  4. ParkingPermit.docx 11/2/2012 Eligibility for Visitors/Temporary Parking Permits

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    ParkingPermit.docx 11/2/2012 Eligibility for Visitors/Temporary Parking Permits Visitor or Temporary Parking Permits will only be issued based on the following policies: Visitors · Visitors (Non WVU employees) to the Statler College can receive a single day visitor Parking Permit for lots 40, 41, 44

  5. PERMIT MUST BE AVAILABLE AT ENTRY LOCATION IN PLASTIC SLEEVE CONFINED SPACE ENTRY PERMIT

    E-Print Network [OSTI]

    Stuart, Steven J.

    PERMIT MUST BE AVAILABLE AT ENTRY LOCATION IN PLASTIC SLEEVE CONFINED SPACE ENTRY PERMIT CONFINED SPACE GENERAL INFORMATION: Permit Number: Call 656-1297 Date: Equipment Number: Time Issued: Valid Until (Time, max. 8 hrs): Confined Space Description and Location: Purpose of Entry: PERMIT SPACE HAZARDS

  6. Annual Hanford Site Environmental Permitting status report

    SciTech Connect (OSTI)

    SONNICHSEN, J.C.

    1999-10-18T23:59:59.000Z

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies.

  7. Annual Hanford Site Environmental Permitting Status Report

    SciTech Connect (OSTI)

    HOMAN, N.A.

    2000-10-01T23:59:59.000Z

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year.

  8. PERIODIC GLOW DISCHARGE REPORT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeeding access toTest andOptimize832 2.860SelectedGLOW DISCHARGE REPORT

  9. Water, Power, and Development in Twenty-First Century China: The Case of the South-North Water Transfer Project

    E-Print Network [OSTI]

    Crow-Miller, Brittany Leigh

    2013-01-01T23:59:59.000Z

    north every province lacks water…” (personal communicationsectors and uses lack adequate water resources. Agriculturesewage discharge due to a lack of adequate water treatment

  10. Requirements Governing Water Quality Standards (West Virginia)

    Broader source: Energy.gov [DOE]

    This rule establishes the requirements governing the discharge or deposit of sewage, industrial wastes and other wastes into waters and establishes water quality standards.

  11. State of Washington Joint Aquatic Resource Permit Application (JARPA)

    E-Print Network [OSTI]

    Manning, Sandra

    2001-01-01T23:59:59.000Z

    all of the required permits, there is a greater likelihoodinform applicants on which permits they need, resulting inreduce the need for permit revisions that are currently

  12. Multiplicity of investment equilibria when pollution permits are not tradable

    E-Print Network [OSTI]

    Karp, Larry

    2006-01-01T23:59:59.000Z

    M ONTERO , J. (2002): “Permits, standards, and technologyequilibria when pollution permits are not tradable Larryequilibria when pollution permits are not tradable Abstract

  13. Sewage Treatment Plant (STP) Design/SPDES Permit Modifications Update

    E-Print Network [OSTI]

    Johnson, Peter D.

    Permit that was issued on June 9, 2009, which included more stringent water quality based effluent limits (NA) NA 2.3 pH (SU) 5.8-9.0 * 6.5-8.5 5.8-8.5 Total Suspended Solids (mg/l) 20 NA NA 20 Total.1 Temperature (°F) 90 NA NA --- Total Nitrogen, as N (mg/l) 10 NA 10 10 Total Nitrogen (lbs/day) 20 NA NA

  14. General Water Quality (Oklahoma)

    Broader source: Energy.gov [DOE]

    The purpose of this water quality rule is to protect, maintain and improve the quality of waters of the State. Any applicant for a federal license, permit or project to conduct any activity...

  15. State Water Quality (Virginia)

    Broader source: Energy.gov [DOE]

    It is the policy of the Commonwealth of Virginia to: (1) protect existing high quality state waters and restore the quality of all other state waters to permit all reasonable public uses and...

  16. Air permitting guidelines for combustion turbine projects

    SciTech Connect (OSTI)

    Macak, J.J. III [Mostardi-Platt Associates, Inc., Elmhurst, IL (United States); Schott, G.A. [Westinghouse Electric Corp., Orlando, FL (United States). Power Generation Business Unit

    1997-09-01T23:59:59.000Z

    Before construction can begin on a new combustion turbine facility, an air permit must be obtained. The air permitting process is generally the critical path permit, often taking in excess of one year to receive final approval. Careful consideration and understanding of combustion turbine operational characteristics and air pollutant emissions will expedite the air permitting process. The purpose of this paper is to identify key issues related to combustion turbine operation that will aid in the preparation of air permit applications. However, before applying for an air permit, a pre-application meeting should be held with the regulatory agency to present an overview of the proposed project, as well as develop the requisite protocols to begin the process.

  17. Corrosion mitigation considerations in planning for zero liquid discharge

    SciTech Connect (OSTI)

    DeWitt-Dick, D.B. [Ashland Chemical Co., Portland, TX (United States). Drew Industrial Division; Lee, B. [Ashland Chemical Co., Boonton, NJ (United States). Drew Industrial Division

    1995-12-01T23:59:59.000Z

    A reduction in the availability and in the quality of water, coupled with more significantly more stringent water discharge restrictions, has resulted in increasing numbers of industrial complexes investigating water reuse and zero liquid discharge. Their investigation generally includes a survey of the potential impact of increased dissolved solids on the formation of mineral salt scales on heat transfer surfaces. These predictive tools are readily available and fairly accurate. The prediction of corrosion potential, however, is not as clearly defined, and as a consequence, little consideration is given to the effects of increased solids on corrosion. In addition to the potential for accelerated corrosion related to increased dissolved solids, many reuse waters contain elevated levels of biological activity and are rich in the nutrients that feed these micro organisms. This paper looks at the reasons for selecting zero liquid discharge as a means of water conservation and discharge reduction, the unit operations available to achieve these goals, and the corrosion mechanisms and mitigation associated with reuse water.

  18. GROUNDWATER FLOW AND TRANSPORT MODELING Application to Submarine Groundwater Discharge, Coastal Wetland Hydrology, and Deep Well Injection

    E-Print Network [OSTI]

    Sukop, Mike

    GROUNDWATER FLOW AND TRANSPORT MODELING Application to Submarine Groundwater Discharge, Coastal, but is also lost to surface water drainage and potential submarine groundwater discharge. There are also to deal with issues such as submarine groundwater discharge and coastal wetland hydrology. SEAWAT also has

  19. Washington Environmental Permit Handbook - Underground Injection...

    Open Energy Info (EERE)

    Washington Environmental Permit Handbook - Underground Injection Control Registration webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site:...

  20. WPCF Underground Injection Control Disposal Permit Evaluation...

    Open Energy Info (EERE)

    WPCF Underground Injection Control Disposal Permit Evaluation and Fact Sheet Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: WPCF Underground Injection...

  1. Colorado Air Pollution Control Division - Construction Permits...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Web Site: Colorado Air Pollution Control Division - Construction Permits Forms and Air Pollutant Emission Notices (APENs)...

  2. Presidential Permits and Export Authorizations - Frequently Asked...

    Broader source: Energy.gov (indexed) [DOE]

    design characteristics to permit the addition of equipment (including all necessary pollution devices) necessary to render such electric powerplant capable of using coal or...

  3. Disclosure of Permitted Communication Concerning Fossil Fuel...

    Broader source: Energy.gov (indexed) [DOE]

    DOE 433 ex parte memo.pdf More Documents & Publications Disclosure of Permitted Communication Concerning Regional Standards Enforcement Framework Document -- Docket No....

  4. Disclosure of Permitted Communication Concerning Regional Standards...

    Broader source: Energy.gov (indexed) [DOE]

    furnacestdwaiverpolicy.pdf More Documents & Publications Disclosure of Permitted Communication Concerning Fossil Fuel Energy Consumption Reduction for New Construction and Major...

  5. Air Permits, Licenses, Certifications (Maine) | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Provider Department of Environmental Protection This program regulates and limits air emissions from a variety of sources within Maine through a statewide permitting program....

  6. Chapter 38 Hazardous Waste Permitting Process (Kentucky)

    Broader source: Energy.gov [DOE]

    This administrative regulation establishes the general provisions for storage, treatment, recycling, or disposal of hazardous waste. It provides information about permits and specific requirements...

  7. Catawba County- Green Construction Permitting Incentive Program

    Broader source: Energy.gov [DOE]

    Catawba County is providing incentives to encourage the construction of sustainably built homes and commercial buildings. Rebates on permit fees and plan reviews are available for certain...

  8. Permit Fees for Hazardous Waste Material Management (Connecticut)

    Broader source: Energy.gov [DOE]

    These regulations describe applicable fees for permit application, modification, and transfer for permits related to hazardous waste management.

  9. Louisiana Water Control Law (Louisiana)

    Broader source: Energy.gov [DOE]

    The Louisiana Department of Environmental Quality administers the proper protection and maintenance of the state's waters, and regulate the discharges of waste materials, pollutants, and other...

  10. Water Quality Standards Implementation (Oklahoma)

    Broader source: Energy.gov [DOE]

    The Oklahoma Department of Environmental Quality regulates Oklahoma's Water Quality Standards. The law states the requirements and standards for point source discharges. It also establishes...

  11. 5 CCR 1002-61 Colorado Discharge Permit System Regulations | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit withTianlinPapersWindey Wind6:00-06:00 U.S. National SoftwareEInformation

  12. WAC - 173-216 State Wastewater Discharge Permit Program | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown of Ladoga,planningFlowmeterUtah: Energydba

  13. 5 CCR 1002-61 Colorado Discharge Permit System Regulations | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcat 1 Windthe Commission |

  14. OAR 340-216 - Air Contaminant Discharge Permits | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri: EnergyExcellence SeedNunn, Colorado:Cables |Open06 - DEQ-150 -16 -

  15. Title 33 CFR 323 Permits for Discharges of Dredged or Fill Material Into

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries PvtStratosolarTharaldson EthanolTillson,Open

  16. Solar PV Permitting and Safety Training Webinar

    Broader source: Energy.gov [DOE]

    This webinar provides training on two permitting resources for municipal inspectors; a prescriptive process for building inspectors and a guidance document for permitting for PV for electrical inspectors. The webinar also runs through a number of key code articles in Massachusetts 2014 electrical code and examines a variety of safety hazards commonly found during or after solar PV installations.

  17. Permitting plan for Hanford Tanks Initiative

    SciTech Connect (OSTI)

    Bloom, J.W.

    1998-03-19T23:59:59.000Z

    This plan describes all the permitting actions that have been identified as required to implement the Hanford Tanks Initiative. It reflects changes in the scope to the Hanford Tanks Initiative since the Rev. 0 plan was issued. The cost and schedule for the permitting actions are included.

  18. Thermal discharges from Paducah Gaseous Diffusion Plant outfalls: Impacts on stream temperatures and fauna of Little Bayou and Big Bayou Creeks

    SciTech Connect (OSTI)

    Roy, W.K.; Ryon, M.G.; Hinzman, R.L. [Oak Ridge National Lab., TN (United States). Computer Science and Mathematics Div.

    1996-03-01T23:59:59.000Z

    The development of a biological monitoring plan for the receiving streams of the Paducah Gaseous Diffusion Plant (PGDP) began in the late 1980s, because of an Agreed Order (AO) issued in September 1987 by the Kentucky Division of Water (KDOW). Five years later, in September 1992, more stringent effluent limitations were imposed upon the PGDP operations when the KDOW reissued Kentucky Pollutant Discharge Elimination System permit No. KY 0004049. This action prompted the US Department of Energy (DOE) to request a stay of certain limits contained in the permit. An AO is being negotiated between KDOW, the US Enrichment Corporation (USEC), and DOE that will require that several studies be conducted, including this stream temperature evaluation study, in an effort to establish permit limitations. All issues associated with this AO have been resolved, and the AO is currently being signed by all parties involved. The proposed effluent temperature limit is 89 F (31.7 C) as a mean monthly temperature. In the interim, temperatures are not to exceed 95 F (35 C) as a monthly mean or 100 F (37.8 C) as a daily maximum. This study includes detailed monitoring of instream temperatures, benthic macroinvertebrate communities, fish communities, and a laboratory study of thermal tolerances.

  19. Thermal Discharges from Paducah Gaseous Diffusion Plant Outfalls: Impacts on Stream Temperatures and Fauna of Little Bayou and Big Bayou Creeks

    SciTech Connect (OSTI)

    Roy, W.K.

    1999-01-01T23:59:59.000Z

    The development of a biological monitoring plan for the receiving streams of the Paducah Gaseous Diffusion Plant (PGDP) began in the late 1980s, because of an Agreed Order (AO) issued in September 1987 by the Kentucky Division of Water (KDOW). Five years later, in September 1992, more stringent effluent limitations were imposed upon the PGDP operations when the KDOW reissued Kentucky Pollutant Discharge Elimination System permit No. KY 0004049. This action prompted the US Department of Energy (DOE) to request a stay of certain limits contained in the permit. An AO is being negotiated between KDOW, the United States Enrichment Corporation (USEC), and DOE that will require that several studies be conducted, including this stream temperature evaluation study, in an effort to establish permit limitations. All issues associated with this AO have been resolved, and the AO is currently being signed by all parties involved. The proposed effluent temperature limit is 89 F (31.7C) as a mean monthly temperature. In the interim, temperatures are not to exceed 95 F (35 C) as a monthly mean or 100 F (37.8 C) as a daily maximum. This study includes detailed monitoring of instream temperatures, benthic macroinvertebrate communities, fish communities, and a laboratory study of thermal tolerances.

  20. Capillary discharge source

    DOE Patents [OSTI]

    Bender, III, Howard Albert

    2003-11-25T23:59:59.000Z

    Debris generation from an EUV electric discharge plasma source device can be significantly reduced or essentially eliminated by encasing the electrodes with dielectric or electrically insulating material so that the electrodes are shielded from the plasma, and additionally by providing a path for the radiation to exit wherein the electrodes are not exposed to the area where the radiation is collected. The device includes: (a) a body, which is made of an electrically insulating material, that defines a capillary bore that has a proximal end and a distal end and that defines at least one radiation exit; (b) a first electrode that defines a first channel that has a first inlet end that is connected to a source of gas and a first outlet end that is in communication with the capillary bore, wherein the first electrode is positioned at the distal end of the capillary bore; (c) a second electrode that defines a second channel that has a second inlet end that is in communication with the capillary bore and an outlet end, wherein the second electrode is positioned at the proximal end of the capillary bore; and (d) a source of electric potential that is connected across the first and second electrodes, wherein radiation generated within the capillary bore is emitted through the at least one radiation exit and wherein the first electrode and second electrode are shielded from the emitted radiation.

  1. Water Rights and Appropriation (South Dakota)

    Broader source: Energy.gov [DOE]

    All uses of water in South Dakota, with the exception of domestic water uses, require a Water Right Permit. The Board of Water and Natural Resources has the authority to regulate and control the...

  2. An Innovative System for the Efficient and Effective Treatment of Non-Traditional Waters for Reuse in Thermoelectric Power Generation

    SciTech Connect (OSTI)

    John Rodgers; James Castle

    2008-08-31T23:59:59.000Z

    This study assessed opportunities for improving water quality associated with coal-fired power generation including the use of non-traditional waters for cooling, innovative technology for recovering and reusing water within power plants, novel approaches for the removal of trace inorganic compounds from ash pond effluents, and novel approaches for removing biocides from cooling tower blowdown. This research evaluated specifically designed pilot-scale constructed wetland systems for treatment of targeted constituents in non-traditional waters for reuse in thermoelectric power generation and other purposes. The overall objective of this project was to decrease targeted constituents in non-traditional waters to achieve reuse criteria or discharge limitations established by the National Pollutant Discharge Elimination System (NPDES) and Clean Water Act (CWA). The six original project objectives were completed, and results are presented in this final technical report. These objectives included identification of targeted constituents for treatment in four non-traditional water sources, determination of reuse or discharge criteria for treatment, design of constructed wetland treatment systems for these non-traditional waters, and measurement of treatment of targeted constituents in non-traditional waters, as well as determination of the suitability of the treated non-traditional waters for reuse or discharge to receiving aquatic systems. The four non-traditional waters used to accomplish these objectives were ash basin water, cooling water, flue gas desulfurization (FGD) water, and produced water. The contaminants of concern identified in ash basin waters were arsenic, chromium, copper, mercury, selenium, and zinc. Contaminants of concern in cooling waters included free oxidants (chlorine, bromine, and peroxides), copper, lead, zinc, pH, and total dissolved solids. FGD waters contained contaminants of concern including arsenic, boron, chlorides, selenium, mercury, chemical oxygen demand (COD), and zinc. Similar to FGD waters, produced waters contained contaminants of concern that are predominantly inorganic (arsenic, cadmium, chlorides, chromium, copper, lead, mercury, nickel, sulfide, zinc, total dissolved solids), but also contained some organics (benzene, PAHs, toluene, total organic carbon, total suspended solids, and oil and grease). Constituents of concern that may cause chemical scaling, biofouling and corrosion, such as pH, hardness and ionic strength, and nutrients (P, K, and N) may also be found in all four non-traditional waters. NPDES permits were obtained for these non-traditional waters and these permit limits are summarized in tabular format within this report. These limits were used to establish treatment goals for this research along with toxicity values for Ceriodaphnia dubia, water quality criteria established by the US EPA, irrigation standards established by the United States Department of Agriculture (USDA), and reuse standards focused on minimization of damage to the power plant by treated waters. Constructed wetland treatment systems were designed for each non-traditional water source based on published literature reviews regarding remediation of the constituents of concern, biogeochemistry of the specific contaminants, and previous research. During this study, 4 non-traditional waters, which included ash basin water, cooling water, FGD water and produced water (PW) were obtained or simulated to measure constructed wetland treatment system performance. Based on data collected from FGD experiments, pilot-scale constructed wetland treatment systems can decrease aqueous concentrations of elements of concern (As, B, Hg, N, and Se). Percent removal was specific for each element, including ranges of 40.1% to 77.7% for As, 77.6% to 97.8% for Hg, 43.9% to 88.8% for N, and no measureable removal to 84.6% for Se. Other constituents of interest in final outflow samples should have aqueous characteristics sufficient for discharge, with the exception of chlorides (<2000 mg/L). Based on total dissolved solids, co-

  3. MCA 75-5-401 - Water Quality Permits: Board Rules for Permits | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant Jump to:LandownersLuther, Oklahoma: EnergyMAREC Jump to:2 - Air Quality Jump

  4. Water Pollution Control Act (New Jersey)

    Broader source: Energy.gov [DOE]

    This act states the rules and regulations to prevent and control pollution of waters in the state. It is unlawful for any person to discharge any pollutant unless the discharge conforms with a...

  5. Construction and early test results of waste transport in piping systems served by ULF water closets

    E-Print Network [OSTI]

    Carrier, Jonathan Gerald

    2003-01-01T23:59:59.000Z

    were completed to characterize the discharge curve of water closets and to determine if venting affects the discharge curve. Initial tests were administered to provide preliminary data investigating the effects of discharge curves and venting on waste...

  6. Discharge cell for ozone generator

    DOE Patents [OSTI]

    Nakatsuka, Suguru (Amagasaki, JP)

    2000-01-01T23:59:59.000Z

    A discharge cell for use in an ozone generator is provided which can suppress a time-related reduction in ozone concentration without adding a catalytic gas such as nitrogen gas to oxygen gas as a raw material gas. The discharge cell includes a pair of electrodes disposed in an opposed spaced relation with a discharge space therebetween, and a dielectric layer of a three-layer structure consisting of three ceramic dielectric layers successively stacked on at least one of the electrodes, wherein a first dielectric layer of the dielectric layer contacting the one electrode contains no titanium dioxide, wherein a second dielectric layer of the dielectric layer exposed to the discharge space contains titanium dioxide in a metal element ratio of not lower than 10 wt %.

  7. Use of microalgae to remove pollutants from power plant discharges

    DOE Patents [OSTI]

    Wilde, E.W.; Benemann, J.R.; Weissman, J.C.; Tillett, D.M.

    1991-04-30T23:59:59.000Z

    A method and system are described for removing pollutants dissolved in the aqueous discharge of a plant, such as a power plant, from a body of water having known hydraulic and physicochemical characteristics, the method comprising (a) modifying the hydraulic system of the body of water including use of physical barriers to define a zone in a portion of the body of water which zone includes the discharge point and where the water has a range of physicochemical characteristics; (b) selecting a large and preferably filamentous, planktonically growing strain of algae adapted to absorb the particular pollutants and genetically dominating algae at the physicochemical characteristics of the zone; (c) establishing a colony of the selected algal strain in the zone; (d) harvesting a portion of the colony; and (e) reinoculating the zone near the discharge point with a fraction of the harvested portion. The fraction used for reinoculation can be adjusted to balance the rate of pollutant removal to the rate of pollutant discharge. 4 figures.

  8. Process integration techniques for optimizing seawater cooling sytems and biocide discharge

    E-Print Network [OSTI]

    BinMahfouz, Abdullah S.

    2007-04-25T23:59:59.000Z

    of Exchanger . . ThermalPolutionTD Regulated . .S W to Prevent High Temperatures Discharge Water to Sea BiocideL The amount of Biocide Added/ Discharged xv in Biocide CurrentL The Currently Added Amount of Biocide Added to Seawater Re...

  9. Flood Zone Building Permits (District of Columbia)

    Broader source: Energy.gov [DOE]

    Building permits are required for new construction and development in the Special Flood Hazard Areas (SFHA). All development projects in SFHA must comply with Title 12 DCMR and Title 20 DCMR...

  10. Alteration of Terrain Permits (New Hampshire)

    Broader source: Energy.gov [DOE]

    This permit is required whenever a project proposes to disturb more than 100,000 square feet of contiguous terrain (50,000 square feet if any portion of project is within protected shoreland), or...

  11. Wind Energy Permitting Standards (North Carolina)

    Broader source: Energy.gov [DOE]

    North Carolina has statewide permitting requirements for wind energy facilities. Any wind turbine or collection of wind turbines located within a half mile of each other with a collective rated...

  12. Distributed PV Permitting and Inspection Processes

    Broader source: Energy.gov [DOE]

    This presentation summarizes case studies of the time and cost involved in the distributed PV permitting and inspection process in three Solar America Cities, Austin, Portland, and Salt Lake City.

  13. Major Source Permits (District of Columbia)

    Broader source: Energy.gov [DOE]

    The District reviews designs for new pollution sources and design modifications for existing sources. Permits are issued to allow sources to emit limited and specified amounts of pollution as...

  14. City of Asheville- Building Permit Fee Waiver

    Broader source: Energy.gov [DOE]

    The City of Asheville waives fees for building permits and plan reviews for certain renewable energy technologies and green building certifications for homes and mixed-use commercial buildings....

  15. Overweight permit formulas for simply supported bridges

    E-Print Network [OSTI]

    Mattox, Michael Joseph

    1992-01-01T23:59:59.000Z

    OVERBRIGHT PERMIT FORMULAS POR SIMPLY SUPPORTED BRIDGES A Thesis by MICHAEL JOSEPH MATTOX Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE... December 1992 Major Subject: Civil Engineering OVERWEIGHT PERMIT FORMULAS POR SIMPLY SUPPORTED BRIDGES A Thesis by MICHAEL JOSEPH MATTOX Approved as to style and content by; James S. Noel (Chair of Committee) Walter E. Haisler (Member) rry L...

  16. Has operating permitting really changed with Title V? Reflecting on the Title V operating permit program

    SciTech Connect (OSTI)

    Goldstein, D.R.; Cressman, A.W.

    1999-07-01T23:59:59.000Z

    Now that some state regulatory agencies are reviewing Title V permit applications and issuing permits, evaluation of the process can be made in comparison with the original goals of the Title V permitting program. In addition, assessment of the terms and conditions that are being incorporated into permits, the nature of draft permits that are issued to facilities for comment, and the extent and type of negotiation that have been conducted with agencies to develop successful Title V permits, will be helpful for facilities that are currently undergoing application review. In working with a Fortune 500 surface coating company, fourteen Title V permit applications were developed and submitted for plants located in Maryland, Pennsylvania, Ohio, New Jersey, Illinois, Georgia, West Virginia, Wisconsin, Indiana and southern California. Draft permits have been issued for several of the plants, and differences in the terms and conditions, testing requirements, and permit format and structure have been noted between states. One of the issued permits required modification, and the process was one of the first for this state agency.

  17. File:06FDAEPAConstructionGeneralPermitConstructionStormwater.pdf | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealandORCEncroachment.pdf Jump to:-FD-a -NVBSundryNotice (2).pdfCOBConstructionStormWaterPermit.pdf Jump

  18. File:06IDATransportationPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealandORCEncroachment.pdf Jump to:-FD-a -NVBSundryNotice6HICDrinkingWaterPermit.pdf

  19. File:06NVATransportationPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealandORCEncroachment.pdf Jump to:-FD-aIDCDrinkingWaterPermit.pdf Jump to:Open Energy

  20. File:06ORATransportationPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealandORCEncroachment.pdf Jump to:-FD-aIDCDrinkingWaterPermit.pdf Jump

  1. Nevada Stormwater General Permit NVR100000 | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania: EnergyEnergyPPCR) JumpAirWork (WaterStormwater General Permit

  2. New Advanced System Utilizes Industrial Waste Heat to Power Water...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    is crucial to ensuring their status as global competitors. Currently, most industries treat water to meet standards for direct discharge to surface water. The process includes a...

  3. Magnetic dipole discharges. III. Instabilities

    SciTech Connect (OSTI)

    Stenzel, R. L.; Urrutia, J. M. [Department of Physics and Astronomy, University of California Los Angeles, California 90095-1547 (United States)] [Department of Physics and Astronomy, University of California Los Angeles, California 90095-1547 (United States); Ionita, C.; Schrittwieser, R. [Institute for Ion Physics and Applied Physics, University of Innsbruck A-6020 Innsbruck (Austria)] [Institute for Ion Physics and Applied Physics, University of Innsbruck A-6020 Innsbruck (Austria)

    2013-08-15T23:59:59.000Z

    Instabilities in a cross-field discharge around a permanent magnet have been investigated. The permanent magnet serves as a cold cathode and the chamber wall as an anode. The magnet is biased strongly negative and emits secondary electrons due to impact of energetic ions. The electrons outside the sheath are confined by the strong dipolar magnetic field and by the ion-rich sheath surrounding the magnet. The electron energy peaks in the equatorial plane where most ionization occurs and the ions are trapped in a negative potential well. The discharge mechanism is the same as that of cylindrical and planar magnetrons, but here extended to a 3-D cathode geometry using a single dipole magnet. While the basic properties of the discharge are presented in a companion paper, the present focus is on various observed instabilities. The first is an ion sheath instability which oscillates the plasma potential outside the sheath below the ion plasma frequency. It arises in ion-rich sheaths with low electron supply, which is the case for low secondary emission yields. Sheath oscillations modulate the discharge current creating oscillating magnetic fields. The second instability is current-driven ion sound turbulence due to counter-streaming electrons and ions. The fluctuations have a broad spectrum and short correlation lengths in all directions. The third type of fluctuations is spiky potential and current oscillations in high density discharges. These appear to be due to unstable emission properties of the magnetron cathode.

  4. Alcohol Services Category #1 # Permit Applica2on Category #2

    E-Print Network [OSTI]

    Powers, Robert

    Alcohol Services Category #1 # Permit Applica2on Category #2 Category #3 If an outdoor event, a;ach UNL Police approved licensed area plan to Permit Request ADMINISTRATOR TO OBTAIN THE REQUIRED ALCOHOL SERVICES PERMIT FOR EACH EVENT

  5. ARM 12-14-150 - Commercial Use Permitting: Restricted Use Permitting...

    Open Energy Info (EERE)

    use permits for land use within the jurisdiction of the Montana Department of Fish, Wildlife and Parks. Published NA Year Signed or Took Effect 2009 Legal Citation ARM...

  6. ARM 12-14-145 - Commercial Use Permitting: Restricted Use Permit...

    Open Energy Info (EERE)

    use permits for land use within the jurisdiction of the Montana Department of Fish, Wildlife and Parks. Published NA Year Signed or Took Effect 2007 Legal Citation ARM...

  7. Integrated Title V/acid rain permits: Transitioning through initial permit issuance and reopenings

    SciTech Connect (OSTI)

    Bloomfield, C. [Environmental Protection Agency, San Francisco, CA (United States)

    1995-12-31T23:59:59.000Z

    Titles IV and V of the Clean Air Act Amendments of 1990 (Act or CAA) created two new stationary source permitting programs, one specific to acid rain (Title IV), and a second for operating permits in general (Title V). The Phase 2 portion of the acid rain program was designed to be implemented through the Title V operating permit program, thereby subjecting all Phase 2 acid rain sources to the requirements of Title V. Permits issued pursuant to Phase 2 of the acid rain program will be viewed as a self-contained portion of the Title V operating permit and will be governed by regulations promulgated under both Title IV and Title V. The requirements imposed by Title IV may not always be consistent with the broader operating permit program requirements of Title V, and when inconsistency occurs, the acid rain requirements will take precedence. This nonalignment will perhaps be most apparent during two stages of initial permitting: (1) the transition period following Title V program approval when permit application, issuance, and effective dates differ between the two programs, and (2) at the point when acid rain permits must be reopened to incorporate Phase 2 NO{sub x} requirements. This paper explores strategies for streamlining implementation of the two programs with particular focus on these two coordination issues.

  8. Journal of Engineering Mathematics Optimal discharging in a branched estuary Optimal discharging in a branched estuary

    E-Print Network [OSTI]

    that returns to the discharge site is less polluted than would 1 #12;Journal of Engineering Mathematics OptimalJournal of Engineering Mathematics Optimal discharging in a branched estuary Optimal discharging the proximity of the discharge site to the branching and upon how the rate of discharge is adjusted. Explicit

  9. AGENDA ADEP Surface Water Protection Project NPDES Storm Water...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ADEP Surface Water Protection Project NPDES Storm Water Individual Permit Bi-Annual Update Public Meeting January 22, 2014 5:30-7:30 p.m. Cities of Gold Conference Center...

  10. Ground and Surface Water Protection (New Mexico)

    Broader source: Energy.gov [DOE]

    This regulation implements the New Mexico Water Quality Act. Any person intending to make a new water contaminant discharge or to alter the character or location of an existing water contaminant...

  11. Contaminating Fresh Waters (Florida)

    Broader source: Energy.gov [DOE]

    It is illegal to discharge any dyestuff, coal tar, oil, sawdust, poison, or deleterious substances into any fresh running waters in Florida in quantities sufficient to injure, stupefy, or kill fish...

  12. Free-surface flow simulations for discharge-based operation of hydraulic structure gates

    E-Print Network [OSTI]

    Erdbrink, C D; Sloot, P M A

    2014-01-01T23:59:59.000Z

    We combine non-hydrostatic flow simulations of the free surface with a discharge model based on elementary gate flow equations for decision support in operation of hydraulic structure gates. A water level-based gate control used in most of today's general practice does not take into account the fact that gate operation scenarios producing similar total discharged volumes and similar water levels may have different local flow characteristics. Accurate and timely prediction of local flow conditions around hydraulic gates is important for several aspects of structure management: ecology, scour, flow-induced gate vibrations and waterway navigation. The modelling approach is described and tested for a multi-gate sluice structure regulating discharge from a river to the sea. The number of opened gates is varied and the discharge is stabilized with automated control by varying gate openings. The free-surface model was validated for discharge showing a correlation coefficient of 0.994 compared to experimental data. A...

  13. water + monitoring + Nevada + permitting | OpenEI Community

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit withTianlinPapersWindey Wind Hometcdb Home Graham7781'sHome Futureutility2 Home3+

  14. File:06AKCDrinkingWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealandORCEncroachment.pdf Jump to:-FD-a -NVBSundryNotice (2).pdf Jump to:

  15. File:06UTBStormWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealandORCEncroachment.pdf JumpUTATransportation.pdf Jump to: navigation, search File File history File

  16. File:06UTCDrinkingWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealandORCEncroachment.pdf JumpUTATransportation.pdf Jump to: navigation, search File File history

  17. Alaska Division of Water Permit Fees | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcat 1AMEEAisin Seiki G60Alameda County,90DECInformationDivision

  18. OpenEI Community - water + monitoring + Nevada + permitting

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRoseConcernsCompany Oil and GasOff<div/0Agency (DLA)

  19. Oregon Directive for NPDES Permits and Section 401 Water Quality

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri: EnergyExcellenceOfficeOhio:OpowerOrchardCity,Protectio

  20. Oregon Water Quality Permit Program (Stormwater - Industrial Activities)

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri:Energy Information FeesInformationWebsite | Open Energy

  1. Montana Disinfected Water and Hydrostatic Testing General Permit | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant JumpMarysville,Missoula, Montana:Northeast AsiaAir Quality ProgramOpenEnergy

  2. Montana Ground Water Pollution Control System Permit Application Forms

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant JumpMarysville,Missoula, Montana:Northeast AsiaAir| Open Energy

  3. Montana Produced Water General Permit - Example Authorization | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant JumpMarysville,Missoula, Montana:Northeast AsiaAir| OpenUse

  4. UPDES Storm Water Permits: General Construction Website | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown of Ladoga, IndianaTurtle Airships JumpTypefor Africa | OpenSolar

  5. Overview of the Storm Water Individual Permit.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for RenewableSpeedingBiomass and BiofuelsOversight Board TheOverview of thethe LANL Storm

  6. Impoundment of Surface Waters (Virginia)

    Broader source: Energy.gov [DOE]

    Many water withdrawal projects involve planning and engineering long before any permits are obtained. DEQ's Office of Water Supply is responsible for assisting the public with such planning and is...

  7. Abatement of Air Pollution: Permit to Construct and Operate Stationary...

    Broader source: Energy.gov (indexed) [DOE]

    Permits are required for the construction or major modification of a stationary source or emission unit. Some exemptions apply. These regulations describe permit requirements,...

  8. U-252: Barracuda Web Filter Input Validation Flaws Permit Cross...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks U-252: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks September...

  9. Request for Information on Permitting of Transmission Lines:...

    Energy Savers [EERE]

    Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines:...

  10. City and County of Denver- Solar Panel Permitting (Colorado)

    Broader source: Energy.gov [DOE]

    Construction, Electrical, Plumbing and Zoning Permits* are required for Photovoltaic (PV) systems installed in the city of Denver. Denver provides same day permit review for most solar panel...

  11. Expedited Permitting of Grid-Scale Wind Energy Development (Maine)

    Broader source: Energy.gov [DOE]

    Maine's Expedited Permitting of Grid-Scale Wind Energy Development statue provides an expedited permitting pathway for proposed wind developments in certain designated locations, known as expedited...

  12. algorithm permitting spectroscopic: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ON SERVING ALCOHOLIC BEVERAGES and NEW ALCOHOL SERVICES PERMIT FORM This spring UNL Police reviewed UNL's Alcohol Permit procedures and guidelines to the Nebraska Liquor...

  13. Application for Presidential Permit OE Docket No. PP-362 Champlain...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Addendum to Presidential Permit Letter. TDI Presidential Permit Application Addendum.pdf More Documents & Publications PP-362 Champlain Hudson Power Express, Inc. Application for...

  14. Application for Presidential Permit OE Docket No. PP-362 Champlain...

    Energy Savers [EERE]

    Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc. Application for Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc....

  15. Application for Presidential Permit OE Docket No. PP-362 Champlain...

    Energy Savers [EERE]

    Update to Presidential Permit Letter. CHPE-USDOE-Amendment.pdf More Documents & Publications EIS-0447: Final Environmental Impact Statement Application for a Presidential Permit OE...

  16. The Waste Isolation Pilot Plant Hazardous Waste Facility Permit...

    Office of Environmental Management (EM)

    The Waste Isolation Pilot Plant Hazardous Waste Facility Permit, Waste Analysis Plan The Waste Isolation Pilot Plant Hazardous Waste Facility Permit, Waste Analysis Plan This...

  17. Compact monolithic capacitive discharge unit

    DOE Patents [OSTI]

    Roesler, Alexander W. (Tijeras, NM); Vernon, George E. (Rio Rancho, NM); Hoke, Darren A. (Albuquerque, NM); De Marquis, Virginia K. (Tijeras, NM); Harris, Steven M. (Albuquerque, NM)

    2007-06-26T23:59:59.000Z

    A compact monolithic capacitive discharge unit (CDU) is disclosed in which a thyristor switch and a flyback charging circuit are both sandwiched about a ceramic energy storage capacitor. The result is a compact rugged assembly which provides a low-inductance current discharge path. The flyback charging circuit preferably includes a low-temperature co-fired ceramic transformer. The CDU can further include one or more ceramic substrates for enclosing the thyristor switch and for holding various passive components used in the flyback charging circuit. A load such as a detonator can also be attached directly to the CDU.

  18. Hanford facility dangerous waste permit application

    SciTech Connect (OSTI)

    none,

    1991-09-18T23:59:59.000Z

    This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit.

  19. Twenty-Plus Years of Environmental Change and Ecological Recovery of East Fork Poplar Creek: Background and Trends in Water Quality

    SciTech Connect (OSTI)

    Smith, John G [ORNL; Stewart, Arthur J [ORNL; Loar, James M [ORNL

    2011-01-01T23:59:59.000Z

    In May 1985, a National Pollutant Discharge Elimination System permit was issued for the Department of Energy's Y-12 National Security Complex (Y-12 Complex) in Oak Ridge, Tennessee, USA, allowing discharge of effluents to East Fork Poplar Creek (EFPC). The effluents ranged from large volumes of chlorinated once-through cooling water and cooling tower blow-down to smaller discharges of treated and untreated process wastewaters, which contained a mixture of heavy metals, organics, and nutrients, especially nitrates. As a condition of the permit, a Biological Monitoring and Abatement Program (BMAP) was developed to meet two major objectives: demonstrate that the established effluent limitations were protecting the classified uses of EFPC, and document the ecological effects resulting from implementing a Water Pollution Control Program at the Y-12 Complex. The second objective is the primary focus of the other papers in this special series. This paper provides a history of pollution and the remedial actions that were implemented; describes the geographic setting of the study area; and characterizes the physicochemical attributes of the sampling sites, including changes in stream flow and temperature that occurred during implementation of the BMAP. Most of the actions taken under the Water Pollution Control Program were completed between 1986 and 1998, with as many as four years elapsing between some of the most significant actions. The Water Pollution Control Program included constructing nine new wastewater treatment facilities and implementation of several other pollution-reducing measures, such as a best management practices plan; area-source pollution control management; and various spill-prevention projects. Many of the major actions had readily discernable effects on the chemical and physical conditions of EFPC. As controls on effluents entering the stream were implemented, pollutant concentrations generally declined and, at least initially, the volume of water discharged from the Y-12 Complex declined. This reduction in discharge was of ecological concern and led to implementation of a flow management program for EFPC. Implementing flow management, in turn, led to substantial changes in chemical and physical conditions of the stream: stream discharge nearly doubled and stream temperatures decreased, becoming more similar to those in reference streams. While water quality clearly improved, meeting water quality standards alone does not guarantee protection of a waterbody's biological integrity. Results from studies on the ecological changes stemming from pollution-reduction actions, such as those presented in this series, also are needed to understand how best to restore or protect biological integrity and enhance ecological recovery in stream ecosystems. With a better knowledge of the ecological consequences of their decisions, environmental managers can better evaluate alternative actions and more accurately predict their effects.

  20. Georgia Water Quality Control Act (Georgia)

    Broader source: Energy.gov [DOE]

    The Georgia Water Quality Control Act (WQCA) is a set of environmental regulations and permitting requirements that comply with the federal Clean Water Act. The Georgia Water Quality Control Act...

  1. Washington State’s Transportation Permit Efficiency and Accountability Committee (TPEAC)

    E-Print Network [OSTI]

    Aberle, Barbara

    2005-01-01T23:59:59.000Z

    as the Transportation Permit Efficiency and Accountability (the Transportation Permit Efficiency and Accountabilityrequired to obtain permits. Passage of the Transportation

  2. Permitting of Wind Energy Facilities: A Handbook

    SciTech Connect (OSTI)

    NWCC Siting Work Group

    2002-08-01T23:59:59.000Z

    This handbook has been written for individuals and groups involved in evaluating wind projects: decision-makers and agency staff at all levels of government, wind developers, interested parties and the public. Its purpose is to help stakeholders make permitting wind facility decisions in a manner which assures necessary environmental protection and responds to public needs.

  3. The Parking Permit Problem Adam Meyerson

    E-Print Network [OSTI]

    Meyerson, Adam W.

    server has an initial purchase price but also has a cost for power, internet connection, and occasional Los Angeles, CA 90095-1596 awm@cs.ucla.edu Abstract We consider online problems where purchases have time durations which expire regardless of whether the purchase is used or not. The Parking Permit

  4. Air Quality: Construction Project Air Permit Requirements

    E-Print Network [OSTI]

    Wechsler, Risa H.

    Air Quality: Construction Project Air Permit Requirements Department: Chemical and General Safety Program: Air Quality Owner: Program Manager Authority: ES&H Manual, Chapter 30, Air Quality1 All manager or operator must submit the completed form to the air quality program manager before the project

  5. Developed by: Solar Permitting Work Group

    E-Print Network [OSTI]

    by the California Center for Sustainable Energy #12;California Solar Permitting Guidebook 3 TABLE OF CONTENTS leader in renewable energy generation. Solar and wind power, as well as emerging technologies such as biomass and fuel cells, are transforming California. Renewable energy is helping to power the state

  6. Renewable Energy Permitting Barriers in Hawaii: Experience from the Field

    SciTech Connect (OSTI)

    Busche, S.; Donnelly, C.; Atkins, D.; Fields, R.; Black, C.

    2013-03-01T23:59:59.000Z

    This white paper presents a summary of the solicited input from permitting agencies and renewable energy developers on the permitting process in Hawaii to provide stakeholders in Hawaii, particularly those involved in permitting, with information on current permitting barriers that renewable energy developers are experiencing.

  7. Community Charter Halibut Permit Application Page 1 of 5

    E-Print Network [OSTI]

    PERMIT (CCHP) U.S. Department of Commerce NOAA National Marine Fisheries Service Alaska Region Restricted

  8. Develop an effective Title V operating permit

    SciTech Connect (OSTI)

    Chadha, N.

    1997-01-01T23:59:59.000Z

    Under Title V of the 1990 Clean Air Act Amendments (CAAA), thousands of industrial and government facilities are required to apply for a comprehensive operating permit that addresses all the emission sources at a site and the CAA regulations that apply to them. The new permitting requirements apply to major sources only--although there are several definitions of a major source under the Amended Act. Because Title V applicability is based on potential to emit (PTE) rather than actual emissions, even small and medium sources may initially be subject to this program. Unlike other regulations, Title V puts the burden of demonstrating continuous compliance on source owners and operators. Careful attention to detail is necessary during the application process because the Title V permit is inherently an enforcement fool for the EPA and the general public. Noncompliance can lead to citizen suits and fines up to $25,000 per day. Therefore, it is critical to negotiate an operating permit that does not adversely impact current operations yet provides flexibility for future modifications. Each state and local agency has its own application forms and regulatory interpretations. Areas of complexity include the classification of emission units, the approach for the PTE calculation, the separation of federal and state-enforceable requirements, and the relationship between Title V and other CAAA titles. This article summarizes some lessons learned based upon experiences in various states. (It does not attempt to resolve program uncertainties among jurisdictions.) The practical strategies presented can be used for developing (or modifying) Title V applications as well as during permit negotiations.

  9. 400 area secondary cooling water sampling and analysis plan

    SciTech Connect (OSTI)

    Penn, L.L.

    1996-10-29T23:59:59.000Z

    This is a total rewrite of the Sampling and Analysis Plan in response to, and to ensure compliance with, the State Waste Discharge Permit ST 4501 issued on July 31, 1996. This revision describes changes in facility status and implements requirements of the permit.

  10. Plasma Structure and Behavior of Miniature Ring-Cusp Discharges

    E-Print Network [OSTI]

    Mao, Hann-Shin

    2013-01-01T23:59:59.000Z

    Basic Ion Thruster Discharge ChamberSimulations for an Ion Engine Discharge Chamber,” J. Propul.Model of an Ion Thruster Discharge Chamber,” in 39th AIAA

  11. Columbia Water & Light- Residential HVAC Rebates

    Broader source: Energy.gov [DOE]

    Columbia Water & Light (CWL) provides residential customers with rebates on energy efficient HVAC equipment. Customers should submit the mechanical permit from a Protective Inspection, a copy...

  12. Section 404 permitting in coastal Texas from 1996 - 2003: patterns and effects on streamflow

    E-Print Network [OSTI]

    Highfield, Wesley E.

    2009-05-15T23:59:59.000Z

    This study explores the spatial-temporal patterns of Section 404 permitting program under the Clean Water Act and examines its impact on mean and peak annual streamflow. The study area consists of 47 sub-basins that are delineated based on USGS...

  13. Cold cathode vacuum discharge tube

    DOE Patents [OSTI]

    Boettcher, Gordon E. (Albuquerque, NM)

    1998-01-01T23:59:59.000Z

    A cold cathode vacuum discharge tube, and method for making same, with an interior surface of the trigger probe coated with carbon deposited by carbon vapor deposition (CVD) or diamond-like carbon (DLC) deposition. Preferably a solid graphite insert is employed in the probe-cathode structure in place of an aluminum bushing employed in the prior art. The CVD or DLC probe face is laser scribed to allow resistance trimming to match available trigger voltage signals and to reduce electrical aging.

  14. Dynamic characteristics of gas-water interfacial plasma under water

    SciTech Connect (OSTI)

    Zheng, S. J.; Zhang, Y. C.; Ke, B.; Ding, F.; Tang, Z. L.; Yang, K.; Zhu, X. D. [Department of Modern Physics, University of Science and Technology of China, Hefei, Anhui 230026 (China)

    2012-06-15T23:59:59.000Z

    Gas-water interfacial plasmas under water were generated in a compact space in a tube with a sandglass-like structure, where two metal wires were employed as electrodes with an applied 35 kHz ac power source. The dynamic behaviors of voltage/current were investigated for the powered electrode with/without water cover to understand the effect of the gas-water interface. It is found that the discharge exhibits periodic pulsed currents after breakdown as the powered electrode is covered with water, whereas the electrical current reveals a damped oscillation with time with a frequency about 10{sup 6} Hz as the powered electrode is in a vapor bubble. By increasing water conductivity, a discharge current waveform transition from pulse to oscillation presents in the water covering case. These suggest that the gas-water interface has a significant influence on the discharge property.

  15. Heat pump water heater and storage tank assembly

    DOE Patents [OSTI]

    Dieckmann, John T. (Belmont, MA); Nowicki, Brian J. (Watertown, MA); Teagan, W. Peter (Acton, MA); Zogg, Robert (Belmont, MA)

    1999-09-07T23:59:59.000Z

    A water heater and storage tank assembly comprises a housing defining a chamber, an inlet for admitting cold water to the chamber, and an outlet for permitting flow of hot water from the chamber. A compressor is mounted on the housing and is removed from the chamber. A condenser comprises a tube adapted to receive refrigerant from the compressor, and winding around the chamber to impart heat to water in the chamber. An evaporator is mounted on the housing and removed from the chamber, the evaporator being adapted to receive refrigerant from the condenser and to discharge refrigerant to conduits in communication with the compressor. An electric resistance element extends into the chamber, and a thermostat is disposed in the chamber and is operative to sense water temperature and to actuate the resistance element upon the water temperature dropping to a selected level. The assembly includes a first connection at an external end of the inlet, a second connection at an external end of the outlet, and a third connection for connecting the resistance element, compressor and evaporator to an electrical power source.

  16. Hanford Site air operating permit application

    SciTech Connect (OSTI)

    NONE

    1995-05-01T23:59:59.000Z

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  17. Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    SciTech Connect (OSTI)

    McCoy, Gilbert A.

    1992-12-01T23:59:59.000Z

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  18. File:06TXAExtraLegalVehiclePermittingProcess.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealandORCEncroachment.pdf Jump to:-FD-aIDCDrinkingWaterPermit.pdf06TXAExtraLegalVehiclePermittingProcess.pdf

  19. Narrow gap electronegative capacitive discharges

    SciTech Connect (OSTI)

    Kawamura, E.; Lieberman, M. A.; Lichtenberg, A. J. [Department of Electrical Engineering and Computer Sciences, University of California, Berkeley, California 94720 (United States)] [Department of Electrical Engineering and Computer Sciences, University of California, Berkeley, California 94720 (United States)

    2013-10-15T23:59:59.000Z

    Narrow gap electronegative (EN) capacitive discharges are widely used in industry and have unique features not found in conventional discharges. In this paper, plasma parameters are determined over a range of decreasing gap length L from values for which an electropositive (EP) edge exists (2-region case) to smaller L-values for which the EN region connects directly to the sheath (1-region case). Parametric studies are performed at applied voltage V{sub rf}=500 V for pressures of 10, 25, 50, and 100 mTorr, and additionally at 50 mTorr for 1000 and 2000 V. Numerical results are given for a parallel plate oxygen discharge using a planar 1D3v (1 spatial dimension, 3 velocity components) particle-in-cell (PIC) code. New interesting phenomena are found for the case in which an EP edge does not exist. This 1-region case has not previously been investigated in detail, either numerically or analytically. In particular, attachment in the sheaths is important, and the central electron density n{sub e0} is depressed below the density n{sub esh} at the sheath edge. The sheath oscillations also extend into the EN core, creating an edge region lying within the sheath and not characterized by the standard diffusion in an EN plasma. An analytical model is developed using minimal inputs from the PIC results, and compared to the PIC results for a base case at V{sub rf}=500 V and 50 mTorr, showing good agreement. Selected comparisons are made at the other voltages and pressures. A self-consistent model is also developed and compared to the PIC results, giving reasonable agreement.

  20. Cold cathode vacuum discharge tube

    DOE Patents [OSTI]

    Boettcher, G.E.

    1998-04-14T23:59:59.000Z

    A cold cathode vacuum discharge tube, and method for making same, with an interior surface of the trigger probe coated with carbon deposited by chemical vapor deposition (CVD) or diamond-like carbon (DLC) deposition are disclosed. Preferably a solid graphite insert is employed in the probe-cathode structure in place of an aluminum bushing employed in the prior art. The CVD or DLC probe face is laser scribed to allow resistance trimming to match available trigger voltage signals and to reduce electrical aging. 14 figs.

  1. Multiple discharge cylindrical pump collector

    DOE Patents [OSTI]

    Dunn, Charlton (Calabasas, CA); Bremner, Robert J. (Woodland Hills, CA); Meng, Sen Y. (Reseda, CA)

    1989-01-01T23:59:59.000Z

    A space-saving discharge collector 40 for the rotary pump 28 of a pool-type nuclear reactor 10. An annular collector 50 is located radially outboard for an impeller 44. The annular collector 50 as a closed outer periphery 52 for collecting the fluid from the impeller 44 and producing a uniform circumferential flow of the fluid. Turning means comprising a plurality of individual passageways 54 are located in an axial position relative to the annular collector 50 for receiving the fluid from the annular collector 50 and turning it into a substantially axial direction.

  2. Cold cathode vacuum discharge tube

    DOE Patents [OSTI]

    Boettcher, G.E.

    1998-03-10T23:59:59.000Z

    A cold cathode vacuum discharge tube, and method for making same, are disclosed with an interior surface of the trigger probe coated with carbon deposited by carbon vapor deposition (CVD) or diamond-like carbon (DLC) deposition. Preferably a solid graphite insert is employed in the probe-cathode structure in place of an aluminum bushing employed in the prior art. The CVD or DLC probe face is laser scribed to allow resistance trimming to match available trigger voltage signals and to reduce electrical aging. 15 figs.

  3. Permit Regulations for the Construction and, or Operation of Air Emissions Equipment (Mississippi)

    Broader source: Energy.gov [DOE]

    The Permit Board will issue two types of air pollution control permits, a permit to construct air emissions equipment and a State Permit to Operate such equipment. A State Permit to Operate is...

  4. Experiment Hazard Class 15.2 - USDA Soil Permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    shipment, and disposal of regulated soil samples. A copy of the current APS USDA Soil Permit must accompany all samples. A copy of the home institution's soil permit is required...

  5. V-193: Barracuda SSL VPN Input Validation Hole Permits Cross...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2.3.3.216 Addthis Related Articles U-252: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks U-144:Juniper Secure Access Input Validation Flaw Permits...

  6. RCRA Hazardous Waste Part A Permit Application: Instructions...

    Open Energy Info (EERE)

    Part A Permit Application: Instructions and Form (EPA Form 8700-23) Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: RCRA Hazardous Waste Part A Permit...

  7. Exclusionary manipulation of carbon permit markets: a laboratory test

    E-Print Network [OSTI]

    Carlén, Björn.

    The experiment reported here tests the case of so-called exclusionary manipulation of emission permit markets, i.e., when a dominant firm -- here a monopolist -- increases its holding of permits in order to raise its rivals' ...

  8. City and County of Denver- Solar Panel Permitting

    Broader source: Energy.gov [DOE]

    Denver provides same-day permit review for most solar panel projects. Electrical, Plumbing, and Zoning Permits* are required for photovoltaic (PV) systems installed in the city of Denver, althoug...

  9. Application for Presidential Permit OE Docket No. PP-334 Energia...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presidential Permit OE Docket No. PP-334 Energia Juarez U.S. Transmission, LLC,: Record of Decision Application for Presidential Permit OE Docket No. PP-334 Energia Juarez U.S....

  10. Application for presidential permit OE Docket No. PP-334 Baja...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    presidential permit OE Docket No. PP-334 Baja Wind U.S Transmission LLC: Federal Register Notice Volume 73, No. 36 - Feb. 22, 2008 Application for presidential permit OE Docket No....

  11. PERMITTING LEADERSHIP IN THE UNITED STATES

    SciTech Connect (OSTI)

    Ken Nemeth

    2002-09-01T23:59:59.000Z

    In accordance with the Southern States Energy Board (SSEB) proposal, as incorporated into NETL/DE-FC26-97FT34199, the objective of this agreement is to streamline the environmental technology permitting process site-to-site, state-to-state, and industry-to-industry to achieve remediation and waste processing faster, better and cheaper. SSEB is working with member Governors, legislators and regulators to build consensus on streamlining the permitting process for new and innovative technologies for addressing the legacy of environmental problems from 50 years of weapons research, development and production. This report reviews mechanisms whereby industry consortiums and the Department of Energy (DOE) have been working with State regulators and other officials in technology deployment decisions within the DOE complex. The historic development of relationships with State regulators is reviewed and the current nature of the relationships examined. The report contains observations from internal DOE reviews as well as recommendations from the General Accounting Office (GAO) and other external organizations. The report discusses reorganization initiatives leading up to a DOE Top-to-Bottom review of the Environmental Management (EM) Program and highlights points of consideration for maintaining effective linkages with State regulators. It notes how the proposed changes will place new demands upon the National Energy Technology Laboratory (NETL) and how NETL can leverage its resources by refocusing existing EM efforts specifically to states that have DOE facilities within their borders (host-states). Finally, the report discusses how SSEB's Permitting Leadership in the United States (PLUS) program can provide the foundation for elements of NETL's technical assistance program that are delivered to regulators and other decision- makers in host-states. As a regional compact commission, SSEB provides important direct linkages to regulators and stakeholders who need technical assistance to evaluate DOE's cleanup plans. In addition, the PLUS program has facilitated the involvement of key regulators from host-states beyond the Southern region.

  12. Annual Storm Water Report for the Y-12 National Security Complex Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    None

    2013-12-01T23:59:59.000Z

    This is the second annual storm water report prepared in accordance with the National Pollutant Discharge Elimination System (NPDES) permit issued to the Y-12 National Security Complex (Y-12 Complex) on December 1, 2011, and the corresponding Y-12 Storm Water Pollution Prevention Plan (SWP3) which became effective on September 7, 2012. However, Appendix A does contain some analytical data gathered under the previous NPDES permit and SWP3 for comparison purposes. The quality of storm water exiting the Y-12 Complex via East Fork Poplar Creek remained relatively stable from 2012 to 2013. However, there was one largely unexpected high concentration of mercury noted in an area that is not known to have previously been a mercury use area. This was noted in Sector AA, Outfall 014. This outfall is normally sampled on a rotating basis but, due this elevated concentration, will be sampled again in 2014. The Y-12 Complex will continue to implement appropriate BMPs and reduce outside material storage ares where possible. Emphasis will continue to be placed on site inspections and timely implementation of proper storm water control measures.

  13. Caltrans Transportation Permits Manual | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomassSustainableCSL GasPermits Manual Jump to: navigation, search OpenEI Reference

  14. WSDE Nationwide Permit webpage | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide Permit webpage Jump to: navigation, search OpenEI Reference

  15. Washington Environmental Permit Handbook - Dangerous Waste Treatment

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide PermitInformationIsland: Energy ResourcesProcess |

  16. Washington Environmental Permit Handbook - NPDES Construction Stormwater

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide PermitInformationIsland: Energy ResourcesProcess |Open

  17. Washington Environmental Permit Handbook - Underground Injection Control

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide PermitInformationIsland: Energy ResourcesProcess

  18. Presidential Permits - Procedures | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSAR - T enAmountCammieReserve |GeothermalDepartment ofPermits -

  19. Sandia Energy - Permitting, Inspection, and Interconnection

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del Sol Home Distribution Grid IntegrationOffshore WindPartnership HomePastPermitting,

  20. Coordinating Permit Office | OpenEI Community

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovationinConcentratingEnergy InformationsourceEnergyCooperativesPermit

  1. Permit by Rule Guide | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal PwerPerkins County, Nebraska: Energy Resources Jump to: navigation, search EquivalentPermaPermit

  2. NPDES Permit Writers Manual | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania: Energy Resources JumpNEFAppropriation andWebsite Jump to:Permit

  3. Innovation and Success in Solar Permitting and Inspection

    Broader source: Energy.gov [DOE]

    This document summarizes several successful initiatives to streamline and standardize permitting requirements for local solar photovoltaic (PV) projects.

  4. On-Site Wastewater Treatment Systems: Selecting and Permitting (Spanish)

    E-Print Network [OSTI]

    Lesikar, Bruce J.

    2005-04-30T23:59:59.000Z

    This publication explains how to select and obtain a permit for an on-site wastewater treatment system in Texas....

  5. Reactor-specific spent fuel discharge projections, 1987-2020

    SciTech Connect (OSTI)

    Walling, R.C.; Heeb, C.M.; Purcell, W.L.

    1988-03-01T23:59:59.000Z

    The creation of five reactor-specific spent fuel data bases that contain information on the projected amounts of spent fuel to be discharged from U.S. commercial nuclear reactors through the year 2020 is described. The data bases contain detailed spent fuel information from existing, planned, and projected pressurized water reactors (PWR) and boiling water eactors (BWR), and one existing high temperature gas reactor (HTGR). The projections are based on individual reactor information supplied by the U.S. reactor owners. The basic information is adjusted to conform to Energy Information Administration (EIA) forecasts for nuclear installed capacity, generation, and spent fuel discharged. The EIA cases considered are: No New Orders (assumes increasing burnup), No New Orders with No Increased Burnup, Upper Reference (assumes increasing burnup), Upper Reference with No Increased Burnup, and Lower Reference (assumes increasing burnup). Detailed, by-reactor tables are provided for annual discharged amounts of spent fuel, for storage requirements assuming maximum at-reactor storage, and for storage requirements assuming maximum at-reactor storage plus intra-utility transshipment of spent fuel. 8 refs., 8 figs., 10 tabs.

  6. Reactor-specific spent fuel discharge projections: 1985 to 2020

    SciTech Connect (OSTI)

    Heeb, C.M.; Libby, R.A.; Walling, R.C.; Purcell, W.L.

    1986-09-01T23:59:59.000Z

    The creation of four spent-fuel data bases that contain information on the projected amounts of spent fuel to be discharged from US commercial nuclear reactors through the year 2020 is described. The data bases contain detailed spent-fuel information from existing, planned, and projected pressurized water reactors (PWR) and boiling water reactors (BWR). The projections are based on individual reactor information supplied by the US reactor owners. The basic information is adjusted to conform to Energy Information Agency (EIA) forecasts for nuclear installed capacity, generation, and spent fuel discharged. The EIA cases considered are: (1) No New Orders with Extended Burnup, (2) No New Orders with Constant Burnup, (3) Middle Case with Extended Burnup, and (4) Middle Case with Constant Burnup. Detailed, by-reactor tables are provided for annual discharged amounts of spent fuel, for storage requirements assuming maximum-at-reactor storage, and for storage requirements assuming maximum-at-reactor plus intra-utility transshipment of spent fuel.

  7. CSEM WP 113 Using Environmental Emissions Permit Prices to Raise

    E-Print Network [OSTI]

    California at Berkeley. University of

    CSEM WP 113 Using Environmental Emissions Permit Prices to Raise Electricity Prices: Evidence from Emissions Permit Prices to Raise Electricity Prices: Evidence from the California Electricity Market analyzes the extent to which the conditions in the emissions permit market for oxides of nitrogen (NOx

  8. U of O Retired Staff Parking Permit Application

    E-Print Network [OSTI]

    Cina, Jeff

    U of O Retired Staff Parking Permit Application Please Print Last Name Faculty Retired Non-tenure track instructor Retired Officer of Research Type of parking permit desired (no cost for permit) Payment Method: I intend to pay immediately, in full, using cash, check, Visa orf

  9. T:\\PTSData\\ParkingRequest\\Disabled Permit Disabled Student Services

    E-Print Network [OSTI]

    de Lijser, Peter

    T:\\PTSData\\ParkingRequest\\Disabled Permit Disabled Student Services Temporary Disabled Person Parking Permit Request Form Parking & Transportation Services (657) 278-3082 / Fax (657) 278-4533 Temporary Disabled Person permits will be issued after completion of Section II by Disabled Student Services

  10. Alcohol Services Category #1 # Permit Application Category #2

    E-Print Network [OSTI]

    Powers, Robert

    Alcohol Services Category #1 # Permit Application Category #2 Category #3 Facility to be Used If an outdoor event, attach UNL Police approved licensed area plan to Permit Request. This individual may TO OBTAIN THE REQUIRED ALCOHOL SERVICES PERMIT FOR EACH EVENT. THE APPROVED CATERER IS RESPONSIBLE

  11. State of Washington Water Research Center Annual Technical Report

    E-Print Network [OSTI]

    : Fifth Research Category: Ground-water Flow and Transport Focus Category: Non Point Pollution, Water Quality, Hydrogeochemistry Descriptors: Non-point pollutants, lindane, triallate, pesticides, water agricultural mass discharges using enviro

  12. Spent nuclear fuel discharges from US reactors 1993

    SciTech Connect (OSTI)

    Not Available

    1995-02-01T23:59:59.000Z

    The Energy Information Administration (EIA) of the U.S. Department of Energy (DOE) administers the Nuclear Fuel Data Survey, Form RW-859. This form is used to collect data on fuel assemblies irradiated at commercial nuclear reactors operating in the United States, and the current inventories and storage capacities of those reactors. These data are important to the design and operation of the equipment and facilities that DOE will use for the future acceptance, transportation, and disposal of spent fuels. The data collected and presented identifies trends in burnup, enrichment, and spent nuclear fuel discharged form commercial light-water reactor as of December 31, 1993. The document covers not only spent nuclear fuel discharges; but also site capacities and inventories; canisters and nonfuel components; and assembly type characteristics.

  13. Management and Storage of Surface Waters (Florida)

    Broader source: Energy.gov [DOE]

    The Department of Environmental Protection regulates the use and storage of surface waters in the state. A permit from either the Department or the local Water Management District is required for...

  14. Oil and Hazardous Substance Discharge Preparedness (Minnesota)

    Broader source: Energy.gov [DOE]

    Anyone who owns or operates a vessel or facility that transports, stores, or otherwise handles hazardous wastes must take reasonable steps to prevent the discharge of those materials.

  15. Negotiating Title V and non-Title V permits

    SciTech Connect (OSTI)

    Erbes, R.E. [Kleinfelder, Inc., Parker, CO (United States); MacDougall, C.R. [Kleinfelder, Inc., Pleasanton, CA (United States)

    1998-12-31T23:59:59.000Z

    The Title V Operating Permits program has been extended over many more years than originally anticipated when the 1990 Clean Air Act Amendments were first legislated. In fact, the regulatory program is still being refined even as facilities complete and submit their Title V permit applications. Likewise, it is clear that the agency review of the Title V permit applications will probably take considerably longer than originally anticipated. Finally, when the agency does complete the review, it is equally clear that there will need to be a significant amount of negotiating on the part of the facility to arrive at a simplified permit that is operationally feasible. This paper presents a number of suggestions for what the facility should be doing between the time the permit application is first submitted and the agency responds with a draft permit. The suggestions are designed to help simplify the permit and enhance flexibility. In addition, the paper presents permit negotiating techniques and points out the pitfalls that will be encountered if the facility does not take action prior to receiving the draft Title V permit. This paper suggests that the facility should internally evaluate how the permit application impacts facility operations prior to the agency doing so. It also suggests that the facility should contact the agency early and amend the permit application to take advantage of increasing regulatory flexibility. By taking these steps, and properly negotiating the permit terms and conditions; the facility will achieve a much better permit, and will hopefully be able to avoid the regulatory burdens and delays associated with re-opening the permit during the next 5 to 8 years (from the time of permit application submittal).

  16. Resource Conservation and Recovery Act: Part B, Permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revison 1.0

    SciTech Connect (OSTI)

    Not Available

    1992-03-01T23:59:59.000Z

    This report contains information related to the permit application for the WIPP facility. Information is presented on solid waste management; personnel safety; emergency plans; site characterization; applicable regulations; decommissioning; and ground water monitoring requirements.

  17. Permit Allocation in Emissions Trading using the Boltzmann Distribution

    E-Print Network [OSTI]

    Park, Ji-Won; Isard, Walter

    2011-01-01T23:59:59.000Z

    In emissions trading, the initial permit allocation is an intractable issue because it needs to be essentially fair to the participating countries. There are many ways to distribute a given total amount of emissions permits among countries, but the existing distribution methods such as auctioning and grandfathering have been debated. Here we describe a new model for permit allocation in emissions trading using the Boltzmann distribution. The Boltzmann distribution is introduced to permit allocation by combining it with concepts in emissions trading. A price determination mechanism for emission permits is then developed in relation to the {\\beta} value in the Boltzmann distribution. Finally, it is demonstrated how emissions permits can be practically allocated among participating countries in empirical results. The new allocation model using the Boltzmann distribution describes a most probable, natural, and unbiased distribution of emissions permits among multiple countries. Based on its simplicity and versati...

  18. Implementation of the Clean Air Act, Title V operating permit program requirements for the U.S. DOE Oak Ridge Reservation facilities

    SciTech Connect (OSTI)

    Humphreys, M.P. [Dept. of Energy Oak Ridge Operations Office, TN (United States). Environmental Protection Div.

    1998-12-31T23:59:59.000Z

    Title V of the Clean Air Act (CAA) establishes a new permit program requiring major sources and sources subject to Title III (Hazardous Air Pollutants) to obtain a state operating permit. Historically, most states have issued operating permits for individual emission units. Under the Title V permit program, a single permit will be issued for all of the emission units at the facility much like the current National Pollutant Discharge Elimination System (NPDES) permit program. The permit will specify all reporting, monitoring, and record-keeping requirements for the facility. Sources required to obtain permits include (a) major sources that emit 100 tons per year or more of any criteria air contaminant, (b) any source subject to the HAP provisions of Title III, (c) any source subject to the acid rain provisions of Title IV, (d) any source subject to New Source Performance Standards, and (e) any source subject to new source review under the nonattainment or Prevention of Significant Deterioration provisions. The State of Tennessee Title V Operating Permit Program was approved by EPA on August 28, 1996. This paper will provide details of initiatives underway at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of requirements under the Title V Operating Permit Program. The ORR encompasses three DOE Facilities: the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the East Tennessee Technology Park (ETTP). The Y-12 Plant manufactures component parts for the national nuclear weapons program; the ORNL is responsible for research and development activities including nuclear engineering, engineering technologies, and the environmental sciences; and the ETTP conducts a variety of research and development activities and is the home of a mixed waste incinerator. Each of the three DOE Facilities is considered a major source under Title V of the CAA.

  19. ElectricOIL discharge and post-discharge kinetics experiments and modeling

    E-Print Network [OSTI]

    Carroll, David L.

    oxygen, ozone, and other excited species adds levels of complexity to the singlet oxygen generator (SOG has been obtained by a near resonant energy transfer from O2(a1 ) produced using a low­pressure oxygen/helium/nitric-oxide discharge. In the electric discharge oxygen-iodine laser (ElectricOIL) the discharge production of atomic

  20. Surface water data at Los Alamos National Laboratory: 2008 water year

    SciTech Connect (OSTI)

    Ortiz, David; Cata, Betsy; Kuyumjian, Gregory

    2009-09-01T23:59:59.000Z

    The principal investigators collected and computed surface water discharge data from 69 stream-gage stations that cover most of Los Alamos National Laboratory and one at Bandelier National Monument. Also included are discharge data from three springs— two that flow into Cañon de Valle and one that flows into Water Canyon.

  1. Surface Water Data at Los Alamos National Laboratory: 2002 Water Year

    SciTech Connect (OSTI)

    D.A. Shaull; D. Ortiz; M.R. Alexander; R.P. Romero

    2003-03-03T23:59:59.000Z

    The principal investigators collected and computed surface water discharge data from 34 stream-gaging stations that cover most of Los Alamos National Laboratory and one at Bandelier National Monument. Also included are discharge data from three springs--two that flow into Canon de Valle and one that flows into Water Canyon--and peak flow data from 16 stations.

  2. Surface water data at Los Alamos National Laboratory: 2009 water year

    SciTech Connect (OSTI)

    Ortiz, David; McCullough, Betsy

    2010-05-01T23:59:59.000Z

    The principal investigators collected and computed surface water discharge data from 73 stream-gage stations that cover most of Los Alamos National Laboratory and one at Bandelier National Monument. Also included are discharge data from three springs— two that flow into Cañon de Valle and one that flows into Water Canyon.

  3. Water Sampling At Long Valley Caldera Geothermal Area (Evans...

    Open Energy Info (EERE)

    Water Sampling Activity Date - 2002 Usefulness useful DOE-funding Unknown Notes "Detailed chemical and isotopic studies not only help quantify the discharge, but also may provide...

  4. Plasma discharge self-cleaning filtration system

    DOE Patents [OSTI]

    Cho, Young I.; Fridman, Alexander; Gutsol, Alexander F.; Yang, Yong

    2014-07-22T23:59:59.000Z

    The present invention is directed to a novel method for cleaning a filter surface using a plasma discharge self-cleaning filtration system. The method involves utilizing plasma discharges to induce short electric pulses of nanoseconds duration at high voltages. These electrical pulses generate strong Shockwaves that disintegrate and dislodge particulate matter located on the surface of the filter.

  5. Underground Injection Control Permits and Registrations (Texas)

    Broader source: Energy.gov [DOE]

    Chapter 27 of the Texas Water Code (the Injection Well Act) defines an “injection well” as “an artificial excavation or opening in the ground made by digging, boring, drilling, jetting, driving, or...

  6. Atmospheric sampling glow discharge ionization source

    DOE Patents [OSTI]

    McLuckey, S.A.; Glish, G.L.

    1989-07-18T23:59:59.000Z

    An atmospheric sampling glow discharge ionization source that can be used in combination with an analytical instrument which operates at high vacuum, such as a mass spectrometer. The atmospheric sampling glow discharge ionization source comprises a chamber with at least one pair of electrodes disposed therein, an inlet for a gaseous sample to be analyzed and an outlet communicating with an analyzer which operates at subatmospheric pressure. The ionization chamber is maintained at a pressure below atmospheric pressure, and a voltage difference is applied across the electrodes to induce a glow discharge between the electrodes, so that molecules passing through the inlet are ionized by the glow discharge and directed into the analyzer. The ionization source accepts the sample under atmospheric pressure conditions and processes it directly into the high vacuum instrument, bridging the pressure gap and drawing off unwanted atmospheric gases. The invention also includes a method for analyzing a gaseous sample using the glow discharge ionization source described above. 3 figs.

  7. Helium corona-assisted air discharge

    SciTech Connect (OSTI)

    Jiang Nan; Gao Lei; Ji Ailing; Cao Zexian [Institute of Physics, Chinese Academy of Sciences, Beijing 100190 (China)

    2011-10-15T23:59:59.000Z

    Operation of atmospheric discharge of electronegative gases including air at low voltages yet without consuming any inert gas will enormously promote the application of non-thermal plasmas. By taking advantage of the low onset voltage for helium corona, air discharge was successfully launched at much reduced voltages with a needle-plate system partly contained in a helium-filled glass bulb--for a needle-plate distance of 12 mm, 1.0 kV suffices. Ultraviolet emission from helium corona facilitates the discharging of air, and the discharge current manifests distinct features such as relatively broad Trichel pulses in both half periods. This design allows safe and economic implementation of atmospheric discharge of electronegative gases, which will find a broad palette of applications in surface modification, plasma medicine and gas treatment, etc.

  8. EU-California Environmental Agreements: The Role of Trade in Emissions Permits and Escape Clauses

    E-Print Network [OSTI]

    Karp, Larry; Zhao, Jinhua

    2008-01-01T23:59:59.000Z

    the role of trade in emissions permits and escape clauses. (agreements. Trade in emissions permits has ambiguous and inAlthough trade in emissions permits reduces the aggregate

  9. When to Pollute, When to Abate? Intertemporal Permit Use in the Los Angeles NOx Market

    E-Print Network [OSTI]

    Holland, Stephen P.; MOORE, MICHAEL R

    2008-01-01T23:59:59.000Z

    such as overlapping cycles of permits, can increase theproblems of bankable permits. References Carlson, Dale A.to Abate? Intertemporal Permit Use in the Los Angeles NO x

  10. Using Environmental Emissions Permit Prices to Raise Electricity Prices: Evidence from the California Electricity Market

    E-Print Network [OSTI]

    Kolstad, Jonathan; Wolak, Frank

    2003-01-01T23:59:59.000Z

    Environmental Emissions Permit Prices to Raise ElectricityEnvironmental Emissions Permit Prices to Raise Electricitythe conditions in the emissions permit market for oxides of

  11. Hawaii Clean Energy Initiative Permit to Cross or Enter the State...

    Open Energy Info (EERE)

    Reference LibraryAdd to library PermittingRegulatory Guidance - Instructions: Hawaii Clean Energy Initiative Permit to Cross or Enter the State Energy CorridorPermitting...

  12. Cryogenic & Gas System Piping Pressure Tests (A Collection of PT Permits)

    SciTech Connect (OSTI)

    Rucinski, Russell A.; /Fermilab

    2002-08-22T23:59:59.000Z

    This engineering note is a collection of pipe pressure testing documents for various sections of piping for the D-Zero cryogenic and gas systems. High pressure piping must conform with FESHM chapter 5031.1. Piping lines with ratings greater than 150 psig have a pressure test done before the line is put into service. These tests require the use of pressure testing permits. It is my intent that all pressure piping over which my group has responsibility conforms to the chapter. This includes the liquid argon and liquid helium and liquid nitrogen cryogenic systems. It also includes the high pressure air system, and the high pressure gas piping of the WAMUS and MDT gas systems. This is not an all inclusive compilation of test documentation. Some piping tests have their own engineering note. Other piping section test permits are included in separate safety review documents. So if it isn't here, that doesn't mean that it wasn't tested. D-Zero has a back up air supply system to add reliability to air compressor systems. The system includes high pressure piping which requires a review per FESHM 5031.1. The core system consists of a pressurized tube trailer, supply piping into the building and a pressure reducing regulator tied into the air compressor system discharge piping. Air flows from the trailer if the air compressor discharge pressure drops below the regulator setting. The tube trailer is periodically pumped back up to approximately 2000 psig. A high pressure compressor housed in one of the exterior buildings is used for that purpose. The system was previously documented, tested and reviewed for Run I, except for the recent addition of piping to and from the high pressure compressor. The following documents are provided for review of the system: (1) Instrument air flow schematic, drg. 3740.000-ME-273995 rev. H; (2) Component list for air system; (3) Pressure testing permit for high pressure piping; (4) Documentation from Run I contained in D-Zero Engineering note 3740.214-EN-268, John Urbin 11120/90; (5) Pressure test procedure; (6) Schematic for pressure test; and (7) List of component pressure ratings. The goal of this independent review is to: (1) Reviewer makes recommendation to the Division/Section Safety Officer to approve the testing permit; and (2) Reviewer is satisfied the FESHM 5031 is met, and recommends to the division head that approval to operate be granted.

  13. Storm water runoff for the Y-12 Plant and selected parking lots

    SciTech Connect (OSTI)

    Collins, E.T.

    1996-01-01T23:59:59.000Z

    A comparison of storm water runoff from the Y-12 Plant and selected employee vehicle parking lots to various industry data is provided in this document. This work is an outgrowth of and part of the continuing Non-Point Source Pollution Elimination Project that was initiated in the late 1980s. This project seeks to identify area pollution sources and remediate these areas through the Resource Conservation and Recovery Act/Comprehensive Environmental Response, Compensation, and Liability Act (RCRA/CERCLA) process as managed by the Environmental Restoration Organization staff. This work is also driven by the Clean Water Act Section 402(p) which, in part, deals with establishing a National Pollutant Discharge Elimination System (NPDES) permit for storm water discharges. Storm water data from events occurring in 1988 through 1991 were analyzed in two reports: Feasibility Study for the Best Management Practices to Control Area Source Pollution Derived from Parking Lots at the DOE Y-12 Plant, September 1992, and Feasibility Study of Best Management Practices for Non-Point Source Pollution Control at the Oak Ridge Y-12 Plant, February 1993. These data consisted of analysis of outfalls discharging to upper East Fork Poplar Creek (EFPC) within the confines of the Y-12 Plant (see Appendixes D and E). These reports identified the major characteristics of concern as copper, iron, lead, manganese, mercury, nitrate (as nitrogen), zinc, biological oxygen demand (BOD), chemical oxygen demand (COD), total suspended solids (TSS), fecal coliform, and aluminum. Specific sources of these contaminants were not identifiable because flows upstream of outfalls were not sampled. In general, many of these contaminants were a concern in many outfalls. Therefore, separate sampling exercises were executed to assist in identifying (or eliminating) specific suspected sources as areas of concern.

  14. Evaluation of approaches to quantify total residual oxidants in ballast water management systems employing chlorine for disinfection

    E-Print Network [OSTI]

    Zimmer-Faust, AG; Ambrose, RF; Ambrose, RF; Tamburri, MN

    2014-01-01T23:59:59.000Z

    quantify total residual oxidants in ballast water managementand discharge (residual concentrations) during ballast waterquantifying residual chlorine levels in natural waters (e.g.

  15. Oxygen Discharge and Post-Discharge Kinetics Experiments and Modeling for the Electric Oxygen-Iodine Laser System

    E-Print Network [OSTI]

    Carroll, David L.

    Oxygen Discharge and Post-Discharge Kinetics Experiments and Modeling for the Electric Oxygen a low-pressure oxygen/helium/nitric oxide discharge. In the electric discharge oxygen-iodine laser (ElectricOIL) the discharge production of atomic oxygen, ozone, and other excited species adds levels

  16. Glow-discharge synthesis of silicon nitride precursor powders

    SciTech Connect (OSTI)

    Ho, P.; Buss, R.J.; Loehman, R.E. (Sandia National Laboratories, Albuquerque, New Mexico 87185-5800 (US))

    1989-07-01T23:59:59.000Z

    A radio-frequency glow discharge is used for the synthesis of submicron, amorphous, silicon nitride precursor powders from silane and ammonia. Powders are produced with a range of Si/N ratios, including stoichiometric, Si-rich, and N-rich, and contain substantial amounts of hydrogen. The powders appear to be similar to silicon diimide and are easily converted to oxide by water vapor. The powders lose weight and crystallize to a mixture of {alpha} and {beta}-Si{sub 3}N{sub 4} after prolonged heating at 1600{degree}C. Studies of spectrally and spatially resolved optical emission from the plasma are reported.

  17. Discharge lamp with reflective jacket

    DOE Patents [OSTI]

    MacLennan, Donald A. (Gaithersburg, MD); Turner, Brian P. (Damascus, MD); Kipling, Kent (Gaithersburg, MD)

    2001-01-01T23:59:59.000Z

    A discharge lamp includes an envelope, a fill which emits light when excited disposed in the envelope, a source of excitation power coupled to the fill to excite the fill and cause the fill to emit light, and a reflector disposed around the envelope and defining an opening, the reflector being configured to reflect some of the light emitted by the fill back into the fill while allowing some light to exit through the opening. The reflector may be made from a material having a similar thermal index of expansion as compared to the envelope and which is closely spaced to the envelope. The envelope material may be quartz and the reflector material may be either silica or alumina. The reflector may be formed as a jacket having a rigid structure which does not adhere to the envelope. The lamp may further include an optical clement spaced from the envelope and configured to reflect an unwanted component of light which exited the envelope back into the envelope through the opening in the reflector. Light which can be beneficially recaptured includes selected wavelength regions, a selected polarization, and selected angular components.

  18. Fluid jet electric discharge source

    DOE Patents [OSTI]

    Bender, Howard A. (Ripon, CA)

    2006-04-25T23:59:59.000Z

    A fluid jet or filament source and a pair of coaxial high voltage electrodes, in combination, comprise an electrical discharge system to produce radiation and, in particular, EUV radiation. The fluid jet source is composed of at least two serially connected reservoirs, a first reservoir into which a fluid, that can be either a liquid or a gas, can be fed at some pressure higher than atmospheric and a second reservoir maintained at a lower pressure than the first. The fluid is allowed to expand through an aperture into a high vacuum region between a pair of coaxial electrodes. This second expansion produces a narrow well-directed fluid jet whose size is dependent on the size and configuration of the apertures and the pressure used in the reservoir. At some time during the flow of the fluid filament, a high voltage pulse is applied to the electrodes to excite the fluid to form a plasma which provides the desired radiation; the wavelength of the radiation being determined by the composition of the fluid.

  19. Geothermal policy development program: expediting the local geothermal permitting process

    SciTech Connect (OSTI)

    Not Available

    1981-07-01T23:59:59.000Z

    For a number of years, concerns have been raised about the length of time and the complexity involved in obtaining required permits in order to develop the geothermal resource at the Geysers. Perhaps the most important factor is jurisdiction. At the Geysers, all three levels of government - local, state, and federal - exercise significant authority over various aspects of geothermal development. In addition, several agencies within each governmental level play an active role in the permitting process. The present study is concerned primarily with the local permitting process, and the ways in which this process could be expedited. This report begins by looking at the local role in the overall permitting process, and then reviews the findings and conclusions that have been reached in other studies of the problem. This is followed by a case study evaluation of recent permitting experience in the four Geysers-Calistoga KGRA counties, and the report concludes by outlining several approaches to expediting the local permitting process.

  20. Roadmap for sustainable water resources in southwestern North America

    E-Print Network [OSTI]

    Lachniet, Matthew S.

    water and remove wastewater. These systems have permitted agricultural production and urban technologies and management systems tobring adequatewaterandremove wastewater. Agricultural production has

  1. Resource Management Services, Part 609: Reclassification of Waters (New York)

    Broader source: Energy.gov [DOE]

    These regulations provide procedures to propose a reclassification of State waters for permitting purposes. Requests must address the factual basis for reclassification, including the size, depth,...

  2. NMDOT Application for Permit to Install Utility Facilities Within...

    Open Energy Info (EERE)

    Reference LibraryAdd to library Legal Document- OtherOther: NMDOT Application for Permit to Install Utility Facilities Within Public ROWLegal Published NA Year Signed or Took...

  3. Los Alamos National Laboratory Hazardous Waste Facility Permit...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hazardous Waste Facility Permit Draft Community Relations Plan CommentSuggestion Form Instructions for completing the form: Please reference the section in the plan that your...

  4. NMSLO Application for Permit to Conduct Geophysical Exploration...

    Open Energy Info (EERE)

    Reference LibraryAdd to library Legal Document- OtherOther: NMSLO Application for Permit to Conduct Geophysical Exploration on Unleased State LandsLegal Published NA Year...

  5. Chapter 52 Permits, Registrations, and Prohibitory Rules (Kentucky)

    Broader source: Energy.gov [DOE]

    Kentucky Administrative Regulation Chapter 52, entitled Air Quality: Permits, Registrations, and Prohibitory Rules, is promulgated under the authority of the Division of Air Quality within the...

  6. Title 18 CFR 4 Licenses, Permits, Exemptions, and Determination...

    Open Energy Info (EERE)

    Title 18 CFR 4 Licenses, Permits, Exemptions, and Determination of Project Costs Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  7. Improving Performance of Federal Permitting and Review of Infrastructu...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Modernizing the nation's electric transmission grid requires improvements in how transmission lines are sited, permitted, and reviewed. As part of its efforts to improve the...

  8. Presidential Permits and Export Authorizations - About the Program...

    Broader source: Energy.gov (indexed) [DOE]

    transmission lines which cross the U.S. international border; and 2.Authorizing exports of electric energy to foreign countries. The authority to grant Presidential permits...

  9. Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)

    Broader source: Energy.gov [DOE]

    Jurisdiction's can use this template to develop a standard permit for residential charging stations that allows for quick, safe installation of EVSE.

  10. Nevada Sample Application for Permit Under Utility Environmental...

    Open Energy Info (EERE)

    Protection Act. Lionel Sawyer & Collins. Initial Application of K Road Moapa Solar, LLC for a Permit to Construct A Transmission Line Under the Utility Environmental...

  11. Air Emissions Operating Permit Regulations for the Purposes of...

    Broader source: Energy.gov (indexed) [DOE]

    Environmental Regulations Provider Department of Environmental Quality The Air Emissions Operating Permit Regulations for the Purpose of Title V of the Federal Clean Air Act...

  12. Regulatory and Permitting Information Desktop Toolkit (Fact Sheet)

    SciTech Connect (OSTI)

    Young, K.

    2014-04-01T23:59:59.000Z

    Overview of DOE's Regulatory and Permitting Information Desktop (RAPID) Toolkit project, providing information on where to go to view documents and who to contact to get involved.

  13. Clark County- Solar and Wind Building Permit Guides

    Broader source: Energy.gov [DOE]

    Clark County, Nevada has established guides for obtaining building permits for wind and solar photovoltaic (PV) systems for both residential and commercial purposes. The guides outline applicable...

  14. Application to Amend Presidential Permit OE Docket No. PP-022...

    Energy Savers [EERE]

    to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border: Federal Register Notice Application to Amend Presidential Permit OE Docket No....

  15. Optimizing operational flexibility and enforcement liability in Title V permits

    SciTech Connect (OSTI)

    McCann, G.T. [Rust Environment and Infrastructure Inc., Greenville, SC (United States)

    1997-12-31T23:59:59.000Z

    Now that most states have interim or full approval of the portions of their state implementation plans (SIPs) implementing Title V (40 CFR Part 70) of the Clean Air Act Amendments (CAAA), most sources which require a Title V permit have submitted or are well on the way to submitting a Title V operating permit application. Numerous hours have been spent preparing applications to ensure the administrative completeness of the application and operational flexibility for the facility. Although much time and effort has been spent on Title V permit applications, the operating permit itself is the final goal. This paper outlines the major Federal requirements for Title V permits as given in the CAAA at 40 CFR 70.6, Permit Content. These Federal requirements and how they will effect final Title V permits and facilities will be discussed. This paper will provide information concerning the Federal requirements for Title V permits and suggestions on how to negotiate a Title V permit to maximize operational flexibility and minimize enforcement liability.

  16. Model operating permits for natural gas processing plants

    SciTech Connect (OSTI)

    Arend, C. [Hydro-Search, Inc., Houston, TX (United States)

    1995-12-31T23:59:59.000Z

    Major sources as defined in Title V of the Clean Air Act Amendments of 1990 that are required to submit an operating permit application will need to: Evaluate their compliance status; Determine a strategic method of presenting the general and specific conditions of their Model Operating Permit (MOP); Maintain compliance with air quality regulations. A MOP is prepared to assist permitting agencies and affected facilities in the development of operating permits for a specific source category. This paper includes a brief discussion of example permit conditions that may be applicable to various types of Title V sources. A MOP for a generic natural gas processing plant is provided as an example. The MOP should include a general description of the production process and identify emission sources. The two primary elements that comprise a MOP are: Provisions of all existing state and/or local air permits; Identification of general and specific conditions for the Title V permit. The general provisions will include overall compliance with all Clean Air Act Titles. The specific provisions include monitoring, record keeping, and reporting. Although Title V MOPs are prepared on a case-by-case basis, this paper will provide a general guideline of the requirements for preparation of a MOP. Regulatory agencies have indicated that a MOP included in the Title V application will assist in preparation of the final permit provisions, minimize delays in securing a permit, and provide support during the public notification process.

  17. Notice of Termination for Authorization under TPDES General Permit...

    Open Energy Info (EERE)

    Termination for Authorization under TPDES General Permit (TXR150000) Jump to: navigation, search OpenEI Reference LibraryAdd to library Reference: Notice of Termination for...

  18. Application for Permit to Construct Access Driveway Facilities...

    Open Energy Info (EERE)

    Application for Permit to Construct Access Driveway Facilities on Highway Right of Way DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link...

  19. Oregon Construction/Installation Permit for Onsite Wastewater...

    Open Energy Info (EERE)

    Oregon ConstructionInstallation Permit for Onsite Wastewater Treatment System Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Construction...

  20. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vickie Bedard Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Vickie Bedard Application from Northern Pass to construct, operate and maintain...

  1. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Larry Rappaport Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Larry Rappaport Application from Northern Pass Transmission to...

  2. Application for Presidential Permit OE Docket No. PP-229 Tucson...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Company Application for Presidential Permit OE Docket No. PP-229 Tucson Electric Power Company Application from Tucson Electric Power Company to construct, operate and maintain...

  3. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Broader source: Energy.gov (indexed) [DOE]

    Border. Opinion of Counsel - 20140609.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Pamela...

  4. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Erick Berglund, Jr. Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Erick Berglund, Jr. Application from Northern Pass to construct, operate...

  5. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fran Buteau Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Fran Buteau Application from Northern Pass Transmission to construct,...

  6. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    State Senator Jeanie Forrester Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from State Senator Jeanie Forrester Application from...

  7. Application for Presidential Permit OE Docket No. PP-257 Emera...

    Broader source: Energy.gov (indexed) [DOE]

    maintain electric transmission facilities at the U.S. - Canada Border. Application for Presidential Permit OE Docket No. PP-257 Emera Energy Services, Inc. More Documents &...

  8. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Mary Bearor Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Mary Bearor Application from Northern Pass Transmission to construct,...

  9. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Broader source: Energy.gov (indexed) [DOE]

    Peggy Wilson, Alaska State Legislature.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from City of Saxman, Alaska...

  10. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Energy Savers [EERE]

    Hydro: Notice of Intervention by Department of Agriculture Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Notice of Intervention by Department of Agriculture...

  11. Application for presidential permit OE Docket No. PP-299 Sea...

    Broader source: Energy.gov (indexed) [DOE]

    facilities at the U.S-Canada border. - Federal Register Notice Application for presidential permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System...

  12. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Robert Cote Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Robert Cote Application from Northern Pass to construct, operate and maintain...

  13. Application for presidential permit OE Docket No. PP-305 Montana...

    Broader source: Energy.gov (indexed) [DOE]

    at the U.S-Canada border. Federal Register Notice Vol 70 No 210. Application for presidential permit OE Docket No. 305 Montana Alberta Tie Ltd More Documents &...

  14. Application for Presidential Permit OE Docket No. PP-400 TDI...

    Office of Environmental Management (EM)

    Project - Comments and Motion to Intervene of Conservation Law Foundation Application for Presidential Permit OE Docket No. PP-400 TDI-NE - New England Clean Power Link Project -...

  15. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    John Doane Sr. Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from John Doane Sr. Application from Northern Pass to construct, operate and...

  16. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nancy Rheinhardt Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Nancy Rheinhardt Application from Northern Pass Transmission to...

  17. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Rana Klug Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Rana Klug Application from Northern Pass to construct, operate and maintain electric...

  18. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Serita Frey Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Serita Frey Application from Northern Pass to construct, operate and maintain...

  19. Application for Presidential Permit OE Docket No. PP-235 Sempra...

    Office of Environmental Management (EM)

    35 Sempra Energy Resources. Application for Presidential Permit OE Docket No. PP-235 Sempra Energy Resources. Application from Sempra Energy Resources to construct, operate and...

  20. Application for presidential permit OE Docket No. PP-305 Montana...

    Office of Environmental Management (EM)

    Update Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Update Application from Montana Alberta Tie Ltd to construct, operate, and maintain...

  1. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Anne Moschella Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Anne Moschella Application from Northern Pass to construct, operate and...

  2. Amended Application for Presidential Permit OE Docket No. PP...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Line: Federal Register Notice, Volume 79, No. 222 - Nov. 18, 2014 Amended Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission...

  3. Application for presidential permit OE Docket No. PP-362 Champlain...

    Broader source: Energy.gov (indexed) [DOE]

    Federal Register Notice Volume 75, No. 43 More Documents & Publications Application for Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc. EIS-0447:...

  4. Application for presidential permit OE Docket No. PP-362 Champlain...

    Broader source: Energy.gov (indexed) [DOE]

    and maintain electric transmission facilities at the U.S. - Canada Border. FINAL TDI Presidential Permit Application. January 25, 2010 More Documents & Publications EIS-0447:...

  5. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Lorna Rose Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Lorna Rose Application from Northern Pass to construct, operate and maintain...

  6. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Energy Savers [EERE]

    Karen Brand Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Karen Brand Application from Soule Hydro to construct, operate and maintain electric...

  7. Application for presidential permit OE Docket No. PP-305 Montana...

    Office of Environmental Management (EM)

    Ltd Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd Application from Montana Alberta Tie Ltd to construct, operate, and maintain electric...

  8. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Gina Neily Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Gina Neily Application from Northern Pass to construct, operate and maintain...

  9. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Roy Stever Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Roy Stever Application from Northern Pass Transmission to construct,...

  10. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Stephen Buzzell and Lelah Sullivan Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Stephen Buzzell and Lelah Sullivan Application from...

  11. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Broader source: Energy.gov (indexed) [DOE]

    Sen Murkowski Letter.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from City of Saxman, Alaska Application for...

  12. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Broader source: Energy.gov (indexed) [DOE]

    from Dept of Agriculture 08-28-13.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Notice of Intervention by Department...

  13. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Courtney Kearley Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Courtney Kearley Application from Northern Pass to construct, operate and...

  14. Application for Presidential Permit OE Docket No. PP-299 Sea...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    99 Sea Breeze Pacific Regional Transmission System, INC Application for Presidential Permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System, INC TBDApplication...

  15. Application for presidential permit OE Docket No. PP-300 Maine...

    Office of Environmental Management (EM)

    0 Maine Public Service Company Application for presidential permit OE Docket No. PP-300 Maine Public Service Company Applicationfrom Maine Public Service Company to construct,...

  16. Application for Presidential Permit OE Docket No. PP-369 British...

    Office of Environmental Management (EM)

    Transmission Corporation and British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission Corporation and...

  17. Application for Presidential Permit OE Docket No. PP-398 Minnesota...

    Office of Environmental Management (EM)

    Comments from Roseau County Board of Commissioners Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line: Comments from Roseau...

  18. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Nicholas Karakoudas Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Nicholas Karakoudas Application from Northern Pass to construct, operate...

  19. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Maureen Quinn Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Maureen Quinn Application from Northern Pass to construct, operate and maintain...

  20. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Michelle Kleindienst Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Michelle Kleindienst Application from Northern Pass to construct, operate...

  1. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Broader source: Energy.gov (indexed) [DOE]

    - Letter from City of Saxman, Alaska.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska State...

  2. Application for Presidential Permit OE Docket No. PP-044 Northern...

    Office of Environmental Management (EM)

    44 Northern Electric Cooperative Association Application for Presidential Permit OE Docket No. PP-044 Northern Electric Cooperative Association Application from Northern Electric...

  3. Application for presidential permit OE Docket No. PP-305 Montana...

    Office of Environmental Management (EM)

    Scope Change 1 Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Scope Change 1 Application from Montana Alberta Tie Ltd to construct, operate,...

  4. Application for Presidential permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    and Requests for Intervention Received on the Amended Application Application for Presidential permit OE Docket No. PP-371 Northern Pass Transmission: Comments and Requests...

  5. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Energy Savers [EERE]

    Energy Authority Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority Application from Soule Hydro to construct, operate and...

  6. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Karen Skurka Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Karen Skurka Application from Northern Pass Transmission to...

  7. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fred Brownson Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Fred Brownson Application from Northern Pass Transmission to...

  8. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Jim Cannon Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Jim Cannon Application from Northern Pass to construct, operate and maintain...

  9. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Campton Conservation Commission Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Campton Conservation Commission Application from Northern Pass...

  10. Application for Presidential Permit OE Docket No. PP-059 Central...

    Office of Environmental Management (EM)

    59 Central Power and Light Company (CPL) Application for Presidential Permit OE Docket No. PP-059 Central Power and Light Company (CPL) Application from Central Power and Light...

  11. Application for presidential permit OE Docket No. PP-362 Champlain...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    presidential permit OE Docket No. PP-362 Champlain Hudson - Notice of Intent To Prepare an Environmental Impact Statement: Federal Register Notice Volume 75, No. 117 - Jun. 18,...

  12. Application for Presidential Permit OE Docket No. PP-229 Tucson...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Company: Federal Register Notice Volume 65, No. 183 - Sep. 20, 2000 Application for Presidential Permit OE Docket No. PP-229 Tucson Electric Power Company: Federal Register Notice...

  13. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Ann Vennerbeck Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Ann Vennerbeck Application from Northern Pass to construct, operate and...

  14. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hayes Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Pamela Hayes Application from Northern Pass to construct, operate and maintain electric...

  15. Application for Presidential Permit OE Docket No. PP-398 Minnesota...

    Office of Environmental Management (EM)

    Federal Register Notice, Vol. 79, No. 93 - May 14, 2014 Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line: Federal...

  16. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Robert Martin Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Robert Martin Application from Northern Pass Transmission to...

  17. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Susan Seitz Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Susan Seitz Application from Northern Pass to construct, operate and maintain...

  18. Application for Presidential Permit OE Docket No. PP-334 Baja...

    Office of Environmental Management (EM)

    Baja Wind Transmission, LLC Application for Presidential Permit OE Docket No. PP-334 Baja Wind Transmission, LLC Application from Baja Wind Transmission, LLC to construct, operate,...

  19. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pamela Martin Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Pamela Martin Application from Northern Pass Transmission to...

  20. Application for Presidential Permit OE Docket No. PP-366 Twin...

    Broader source: Energy.gov (indexed) [DOE]

    maintain electric transmission facilities at the U.S. - Canada Border. Application for Presidential Permit OE Docket No. PP-366 Twin Rivers Paper Company, Inc. More Documents &...