Powered by Deep Web Technologies
Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Map Locating Berkeley Lab Washington, DC Office  

NLE Websites -- All DOE Office Websites (Extended Search)

WASHINGTON, DC PROJECTS OFFICE WASHINGTON, DC PROJECTS OFFICE Map LEGEND: A:Berkeley Lab DC Office; PNNL; NREL; ORNL | B: EPA Waterside Mall C: Metrorail Station: Smithsonian | D: Metrorail Station: L'Enfant Plaza Notice: Due to security requirements in the building, all visitors to the Berkeley Lab DC Projects Office must check in at the ground floor entrance. If you do not have a DOE access badge, you will need to obtain a building visitor badge. To expedite this process, visitors are encouraged to RSVP to their meeting host or call (202) 488-2250 ahead of time. Metal detectors and x-ray screening of personal items are required for all visitors and staff entering the building. Directions to the Lab's Washington, DC Projects Office 901 D Street, SW Suite 950 Washington, DC 20024 Phone/Fax: (202) 488-2250

2

UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Washington, DC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFFICE OF PERSONNEL MANAGEMENT Washington, DC 20415 The Director November 8, 2010 MEMORANDUM FOR HEADS OF DEPARTMENTS AND AGENCIES FROM: JOHN BERRY ( . .. (t"t-.. DIRECTOR...

3

BERAC Meeting March 9-11, 2011 Washington, DC | U.S. DOE Office of Science  

Office of Science (SC) Website

March 9-11, 2011 Washington, DC March 9-11, 2011 Washington, DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting March 9-11, 2011 Washington, DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting March 9-10, 2011 Washington, DC Agenda .pdf file (7KB) Presentations Warren Washington .pptx file (29.0MB), The Present and Future of Climate Modeling William Brinkman .pptx file (25.3MB), Office of Science Report Sharlene Weatherwax .pdf file (446KB), State of BER Report Paul Bryan .pptx file (2.4MB), Activities in DOE's Office of Biomass Programs Gary Geernaert .pptx file (8.3MB), Climate and Environmental Sciences

4

BLM Washington Office | Open Energy Information  

Open Energy Info (EERE)

Bureau of Land Management Address 1849 C Street NW, Rm. 5665 Place Washington, DC Zip 20240 Phone number 202-208-3801 Website http:www.blm.govwostenin References...

5

Business Opportunities Session Office of Environmental Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Business Opportunities Session Office of Environmental Management Business Opportunities Session Office of Environmental Management Environmental Clean up Business Opportunities...

6

NREL: Energy Analysis - Washington D.C. Office Staff  

NLE Websites -- All DOE Office Websites (Extended Search)

Washington D.C. Office Washington D.C. Office The following SEAC staff are based in our Washington D.C. Office. They support a variety of programs and activities, and often are the liaison between the U.S. Department of Energy and staff based in Golden, Colorado. Team Lead: Margaret Mann (Golden) Administrative Support: JoAnn Weaver (Golden) Thomas Jenkin Austin Brown David J. Feldman Tom Schneider Robert Margolis Kathleen Nawaz Monisha Shah Photo of Austin Brown. Austin Brown Senior Analyst (Strategic Planning) Areas of expertise Crosscutting low-carbon strategies Clean transportation technologies and policies Primary research interests Clean energy research portfolio planning Energy and society Sustainable transportation systems More information on Austin Brown Photo of David J. Feldman

7

DOE's Offices of Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement of Intent (SOI) Statement of Intent (SOI) between the US Dept of Energy (DOE) and the UK Nuclear Decommissioning Authority (NDA) on decommissioning and waste management was renewed for a further five years during the Waste Management conference in Phoenix, AZ in March. The signatories to the SOI were the DOE's Offices of Environmental Management (EM) and Nuclear Energy (NE) and the NDA, with NE being a new addition to the arrangement. The Office of Environment Management is responsible for the clean-up of the former nuclear weapons' sites and the relationship between them and the NDA has already resulted in collaboration in a number of areas such as thermal treatments for stabilization of wastes, plutonium management, aging facilities management, non-standard fuels

8

BERAC Meeting, February 16-17, 2012, Washington, DC| U.S. DOE Office of  

Office of Science (SC) Website

February 16-17, 2012, Washington, DC February 16-17, 2012, Washington, DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting, February 16-17, 2012, Washington, DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting February 16-17, 2012 Washington, DC Agenda .pdf file (25KB) Presentations William Brinkman, Comments from the Director, Office of Science .pdf file (24.4MB) Sharlene Weatherwax, State of BER Report .pdf file (4.3MB) Eddy Rubin, Joint Genome Institute Update .ppt file (18.0MB) Allison Campbell, Environmental Molecular Sciences Laboratory (EMSL) Update .pdf file (17.8MB) Adam Arkin, Knowledgebase Discussion .pdf file (8.9MB)

9

BERAC Meeting April 25-26, 2002 Washington, DC | U.S. DOE Office of Science  

Office of Science (SC) Website

25-26, 2002 Washington, DC 25-26, 2002 Washington, DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting April 25-26, 2002 Washington, DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting April 25-26, 2002 Washington DC Agenda .pdf file (6KB) Available Presentations James Decker .ppt file (22.1MB), Principal Deputy Director, Office of Science Rod Brown .ppt file (70KB), Deputy Undersecretary for Research, Education and Economics, USDA Ari Patrinos .ppt file (64KB), Associate Director for Biological & Environmental Research Dick Swaja .ppt file (74KB), National Institute of Biomedical Imaging and

10

Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington Washington , DC 20585 September 20, 2012 MEMORANDUM FOR HEADS OF CONTRACTING ACTIVITY AND PROCUREMENT DIRECTORS FROM : SUBJECT: PAULBOSCO~~ - SENIOR PROCUhM~ OFFICE OF ACQUISITION AND PROJECT MANAGEMENT JOSEPH F. WADDELL SENIOR PROCUREMENT NNSA OFFICE OF ACQ SITION MANAGEMENT Acquisition Savings Reporting Template Guidance The Department is continuing to make progress in its efforts to support the Office of Management and Budget (OMB) Acquisition Savings Initiative, as well as the Department's Strategic Sourcing Program. After using our current reporting template for the past year, it was a good time to review the process and make adjustments where necessary. The Government Accountability Office (GAO) has also noted in an audit that

11

United States Environmental Protection Agency Office of Water  

E-Print Network (OSTI)

United States Environmental Protection Agency Office of Water Washington, D. C. 20460 United States States Environmental Protection Agency (EPA) hereby establish the policy and procedures pursuant to which 19, 1989, DEPARTMENT OF THE ARMY/ENVIRONMENTAL PROTECTION AGENCY MEMORANDUM OF AGREEMENT CONCERNING

US Army Corps of Engineers

12

ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT OFFICE OF EM Recovery NEWS FLASH RECOVERY.GOV March 10, 2011 American Recovery and Reinvestment Act Payments Surge Past $4 Billion U.S. Depar tment of Energy | Office of Environmental Management For More Information on EM Recovery Act Work, Visit Us on the Web: http://www.em.doe.gov/emrecovery/ FINANCIAL HIGHLIGHTS * More than $4 BILLION in Recovery Act payments are accelerating environmental cleanup * 67% of EM Recovery Act funds have been paid Financial data are based on reporting as of March 9, 2011, and are subject to change. EM has made more than $4 billion in Recovery Act payments, or 32 percent of the DOE's $12.4 billion in Recovery Act payments. DOE received $35.2 billion

13

Advanced simulation capability for environmental management (ASCEM): An overview of initial results  

E-Print Network (OSTI)

Energy, Office of Environmental Management, in Washington,of Energy, Office of Environmental Management, Washington,DOE) Office of Environmental Management (EM) determined that

Williamson, M.

2012-01-01T23:59:59.000Z

14

OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration...

15

Office of Environmental Management (EM) Organization Chart |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration...

16

Office of Environmental Protection, Sustainability Support &...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Protection, Sustainability Support & Corporate Safety Analysis Office of Environmental Protection, Sustainability Support & Corporate Safety Analysis Organizational...

17

Office of Environmental Management | Department of Energy  

Office of Environmental Management (EM)

Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration Program Management Communication & Engagement...

18

DOE Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Management Environmental Management Project and Contract Management Improvement Timeline Improving DOE contract and project management is a top priority of the Department's senior management and entire organization. The DOE Office of Environmental Management (EM) has put in place a "Roadmap" for Journey to Excellence that sets specific performance expectations for continuous improvements in contract and project management. Following are some highlights of EM's improvement actions over the past five years. In 2006, the National Academy of Public Administration (NAPA) began a study of EM, which included acquisition and project management among its key focus areas. The resultant report from the study,

19

The Office of Environmental Management (EM) Defense Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(EM) Defense Environmental Cleanup The Office of Environmental Management (EM) Defense Environmental Cleanup Microsoft Word - 271C2C7B.doc More Documents & Publications Microsoft...

20

The Office of Environmental Management Non-Defense Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Microsoft Word - PSRP Updates 6-25-10v2 The Office of Environmental Management (EM) Defense Environmental Cleanup The Office of Environmental Management Uranium Enrichment D&D...

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Import Statement, Richland, Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COVER SHEET 1 COVER SHEET 1 U.S. Department of Energy, Richland Operations Office 2 3 TITLE: 4 Revised Draft Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact 5 Statement, Richland, Benton County, Washington (DOE/EIS-0286D2) 6 7 CONTACT: 8 For further information on this document, write or call: Mr. Michael S. Collins HSW EIS Document Manager Richland Operations Office U.S. Department of Energy, A6-38 P.O. Box 550 Richland, Washington 99352-0550 Telephone: (800) 426-4914 Fax: (509) 372-1926 Email: hsweis@rl.gov For further information on the Department's National Environmental Policy Act process, contact: Ms. Carol M. Borgstrom, Director Office of NEPA Policy and Compliance, EH-42 U.S. Department of Energy 1000 Independence Avenue, S.W.

22

Final Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement Richland, Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COVER SHEET COVER SHEET U.S. Department of Energy, Richland Operations Office TITLE: Final Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement, Richland, Benton County, Washington (DOE/EIS-0286F) CONTACT: For further information on this document, write or call: Mr. Michael S. Collins HSW EIS Document Manager Richland Operations Office U.S. Department of Energy, A6-38 P.O. Box 550 Richland, Washington 99352-0550 Telephone: (509) 376-6536 Fax: (509) 372-1926 Email: hsweis@rl.gov For further information on the Department's National Environmental Policy Act (NEPA) process, contact: Ms. Carol M. Borgstrom, Director Office of NEPA Policy and Compliance, EH-42 U.S. Department of Energy 1000 Independence Avenue, S.W.

23

Oak Ridge Operations Office of Environmental Management Overview...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge Operations Office of Environmental Management Overview Oak Ridge Operations Office of Environmental Management Overview Oak Ridge Operations Office of Environmental...

24

BERAC Meeting November 3-4, 2004 Washington, DC | U.S. DOE Office...  

Office of Science (SC) Website

3-4, 2004 Washington, DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges Reports Charter...

25

Revised Draft Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Import Statement, Richland, Washington - Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Link to Main Report Link to Main Report RESPONSIBLE AGENCY: COVER SHEET 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 U.S. Department of Energy, Richland Operations Office TITLE: Revised Draft Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement, Richland, Benton County, Washington (DOE/EIS-0286D2) CONTACT: For further information on this document, write or call: Mr. Michael S. Collins HSW EIS Document Manager Richland Operations Office U.S. Department of Energy, A6-38 P.O. Box 550 Richland, Washington 99352-0550 Telephone: (800) 426-4914 Fax: (509) 372-1926 Email: hsweis@rl.gov For further information on the Department's National Environmental Policy Act process,

26

Acting Assistant Secretary for DOE Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Acting Assistant Secretary for DOE Office of Environmental Acting Assistant Secretary for DOE Office of Environmental Management Visits Hanford - First Visit, Commemorates Completion of Major Recovery Act Project Acting Assistant Secretary for DOE Office of Environmental Management Visits Hanford - First Visit, Commemorates Completion of Major Recovery Act Project August 11, 2011 - 12:00pm Addthis Media Contact Geoff Tyree, DOE Geoffrey.Tyree@rl.doe.gov 509-376-4171 Media visit requirements to be completed by 2 p.m. today: This visit requires badges and an RSVP by 2 p.m. today by email to tmbirch@wch-rcc.com at Washington Closure Hanford. You must include in your email (for badging purposes) your full name exactly as it appears on your driver's license, confirm you are a U.S. Citizen, your date of birth, as well as the name, address, and phone number of the company you are

27

Environmental Assessment K Pool 'Fish Rearing, Hanford Site, Richland, Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOERA-1 11 1 DOERA-1 11 1 Environmental Assessment K Pool 'Fish Rearing, Hanford Site, Richland, Washington U.S. Department of Emrgy Richland, Washington December 1996 DOEEA-1111 ENVIRONMJ3'NTAL ASSESSMENT K POOL 'F'ISH REARING HANFORD SITE, RICHLAND, WASHINGTON U.S. DEPARTMENT OF ENERGY RICHLAND, WASHINGTON December 1996 This page intentionally left blank. DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document. 1 ' U.S. Department of Energy summary The U.S. Department of Energy (DOE) has a need to respond to a request to lease facilities at the Hanford Site 100-KE and 100-KW filter plant pools (K Pools) for fish rearing activities. These fish rearing activities would be: (1) business ventures with public h

28

Office of Environmental Protection, Sustainability Support &...  

NLE Websites -- All DOE Office Websites (Extended Search)

HSS Logo Welcome to the Office of Environmental Protection, Sustainability Support & Corporate Safety Analysis Sustainability Support Provides the understanding and implementation...

29

Office of Environmental Protection, Sustainability Support &...  

NLE Websites -- All DOE Office Websites (Extended Search)

Mission and Functions of the Office of Environmental Protection, Sustainability Support & Corporate Safety Analysis (HS-20) Direct Report to the Deputy Chief for Mission Support...

30

California geothermal resource development environmental implications for ERCDC Environmental Analysis Office. Final report  

DOE Green Energy (OSTI)

The results of an analysis of the environmental implications for ERCDC Environmental Analysis Office (EAO) in relation to the development of California's geothermal resources are reported. While focusing primarily on environmental implications, particularly the natural, social, and economic elements, the report includes some ERCDC-wide policy and program considerations. The primary thrusts of the work have been in the development of an understanding of the interagency and intergovernmental environmental data and data-management roles and responsibilities and in the formulation of recommendations related thereto. Five appendices are included, one of which is a tax credit agreement between a power company and Skagit County, Washington. (JGB)

Roberts, J.A.

1977-02-01T23:59:59.000Z

31

Washington Regions | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Regions Regions National Science Bowl® (NSB) NSB Home About High School High School Students High School Coaches High School Regionals High School Rules, Forms, and Resources Middle School Attending National Event Volunteers 2013 Competition Results News Media WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: 202-586-6702 E: National.Science.Bowl@science.doe.gov High School Regionals Washington Regions Print Text Size: A A A RSS Feeds FeedbackShare Page Washington Coaches can review the high school regional locations listed below. Please note: Registrations are based on the location of your school. Please be sure to select the regional that is designated for your school's state, county, city, or district.

32

Washington Regions | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Regions Regions National Science Bowl® (NSB) NSB Home About High School Middle School Middle School Students Middle School Coaches Middle School Regionals Middle School Rules, Forms, and Resources Attending National Event Volunteers 2013 Competition Results News Media WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: 202-586-6702 E: National.Science.Bowl@science.doe.gov Middle School Regionals Washington Regions Print Text Size: A A A RSS Feeds FeedbackShare Page Washington Coaches can review the middle school regional locations listed below. Please note: Registrations are based on the location of your school. Please be sure to select the regional that is designated for your

33

DOE - Office of Legacy Management -- Carnegie Institute of Washington Dept  

Office of Legacy Management (LM)

Carnegie Institute of Washington Carnegie Institute of Washington Dept of Genetics - NY 0-07 FUSRAP Considered Sites Site: Carnegie Institute of Washington (Dept. of Genetics) (NY.0-07 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Cold Spring Harbor , New York NY.0-07-1 Evaluation Year: 1987 NY.0-07-1 Site Operations: This site served as a meeting place on June 25, 1942 for the 'Executive Committee of S-1,' a group comprised of various military and academic personnel. Discussions took place regarding what contracts should be extended beyond July 1, 1942 for scientific and other technical work done for the U.S. Government. NY.0-07-2 Site Disposition: Eliminated NY.0-07-1 Radioactive Materials Handled: None Indicated

34

Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 5, 2011 December 5, 2011 MEMORANDUM FOR SECRETARIAL OFFICERS AND HEADS OF FIELD ORGANIZATIONS FROM: SUBJECT: !~::o~~~ral Cou;;(} '/-- Reminder Regarding Annual National Environmental Policy Act (NEP A) Planning Summaries Early involvement by senior management in the NEP A planning process is a key component of a successful NEP A compliance program. Thus, Department of Energy (DOE) Order 451.1 B requires that each Secretarial Officer and Head of a Field Organization submit an annual NEP A planning summary to the General Counsel by January 31 of each year and make it available to the public. Preparation of these summaries helps ensure that NEP A activities are aligned with program priorities and that resources are allocated to enable timely completion ofNEPA

35

BERAC Meeting April 30 - May 1, 2003 Washington DC | U.S. DOE Office of  

Office of Science (SC) Website

30 - May 1, 2003 Washington DC 30 - May 1, 2003 Washington DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting April 30 - May 1, 2003 Washington DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting April 30 - May 1, 2003 Washington, DC Agenda .pdf file (8KB) Presentations Teresa Fryberger .ppt file (5.9MB), Director, Environmental Remediation Sciences Division, Division and Draft Strategic Plan Overview Anna Palmisano .ppt file (16.6MB), Natural and Accelerated Bioremediation Research Program Update Roland Hirsch .ppt file (740KB), Environmental Management Science Program Bill Rogers .ppt file (10.6MB), Environmental Molecular Sciences

36

SFCD Environmental Assessment for Future Development on the South Federal Campus, Pacific Northwest National Laboratory, Richland, Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment Environmental Assessment for Future Development in Proximity to the William R. Wiley Environmental Molecular Sciences Laboratory, Pacific Northwest National Laboratory, Richland, Washington U.S. Department of Energy Pacific Northwest Site Office Richland, Washington 99352 July 2013 U.S. Department of Energy DOE/EA-1958 This page intentionally left blank. Environmental Assessment July 2013 U.S. Department of Energy DOE/EA-1958 Summary The Pacific Northwest National Laboratory (PNNL) is a multi-program U.S. Department of Energy- Office of Science (DOE-SC) national laboratory conducting research to meet DOE strategic objectives. To enable continued research support, DOE-SC is proposing to construct new facilities and infrastructure

37

Environmental Survey preliminary report, Hanford Site, Richland, Washington  

SciTech Connect

This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Hanford Site, conducted August 18 through September 5, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Hanford Site. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Hanford Site, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the Hanford Site. The Interim Report will reflect the final determinations of the Hanford Site Survey. 44 refs., 88 figs., 74 tabs.

Not Available

1987-08-01T23:59:59.000Z

38

Environmental Survey preliminary report, Hanford Site, Richland, Washington  

SciTech Connect

This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Hanford Site, conducted August 18 through September 5, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Hanford Site. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Hanford Site, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the Hanford Site. The Interim Report will reflect the final determinations of the Hanford Site Survey. 44 refs., 88 figs., 74 tabs.

1987-08-01T23:59:59.000Z

39

FY 2013 Budget Request Office of Environmental Management | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FY 2013 Budget Request Office of Environmental Management FY 2013 Budget Request Office of Environmental Management The FY 2013 budget will support major cleanup accomplishments in...

40

Office of Environmental Management: A Journey to Excellence ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration...

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Office of Environmental Management Small Business Program Small...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Environmental Management Small Business Program Small Program Business Opportunity Session Office of Environmental Management Small Business Program Small Program...

42

Establishing the Office of Environmental Management Quality Assurance...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Establishing the Office of Environmental Management Quality Assurance Corporate Board Establishing the Office of Environmental Management Quality Assurance Corporate Board The...

43

Oak Ridge Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge Office of Environmental Management Congressional Nuclear Cleanup Caucus Mark Whitney Manager Oak Ridge, TN May 16, 2013 www.energy.govEM 2 EM Program Overview ETTP ORNL...

44

Office of Environmental Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Environmental Management EM's Budget Proposal EM's Fiscal Year 2014 Budget Request Read more Idaho Site Taps Old World Process to Treat Nuclear Waste The EM program at...

45

The Department of Energy's Office of Environmental Management's Budget Allocation Plan, OAS-L-12-03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Department of Energy's Office The Department of Energy's Office of Environmental Management's Budget Allocation Plan OAS-L-12-03 March 2012 Department of Energy Washington, DC 20585 March 15, 2012 MEMORANDUM FOR THE SENIOR ADVISOR FOR ENVIRONMENTAL MANAGEMENT FROM: Daniel M. Weeber, Director Eastern Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Department of Energy's Office of Environmental Management's Budget Allocation Plan" BACKGROUND The Department of Energy's Office of Environmental Management is tasked with managing the technically challenging risks posed by the world's largest nuclear cleanup effort. At the end of Fiscal Year 2010, EM had responsibility for nuclear cleanup activities at 18 sites covering more

46

Office of Environmental Management | Department of Energy  

NLE Websites -- All DOE Office Websites

Environmental Management Environmental Management Search Search form Search Office of Environmental Management Office of Environmental Management Services Services Home Waste Management Waste Management Home Nuclear Materials & Waste Tank Waste and Waste Processing Waste Disposition Packaging and Transportation Site & Facility Restoration Site & Facility Restoration Home Deactivation & Decommissioning (D&D) Facility Engineering Soil & Groundwater Sustainability Program Management Program Management Home Safety Security Quality Assurance Budget & Performance Acquisition Compliance Project Management Communication & Engagement Communication & Engagement Home Intergovernmental Programs EMAB EM SSAB Tribal Programs International Programs Long-Term Stewardship Community Involvement Fund

47

Final Environmental Impact Statement Plymouth Generating Facility Plymouth, Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plymouth Generating Facility Plymouth Generating Facility Plymouth, Washington Prepared by: Benton County, Washington Bonneville Power Administration (DOE/EIS 0345) June 2003 Final Environmental Impact Statement Plymouth Generating Facility To: People Interested in the Plymouth Generating Facility Enclosed is the Final EIS for the Plymouth Generating Facility. The Draft EIS was published in August 2002, and comments were received through October 5, 2002. The Final EIS contains revisions to the Draft EIS and our responses to public and agency comments on the Draft EIS. This letter briefly describes the Final EIS, outlines our next steps, and tells how to contact us if you have questions. The Final EIS is abbreviated, consisting of an updated summary and project description

48

Final Environmental Assessment for the Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

562 562 Environmental Assessment Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington U.S. Department of Energy Pacific Northwest Site Office Richland, Washington 99352 Final January 2007 U.S. Department of Energy DOE/EA-1562 Environmental Assessment S-1 January 2007 Summary Introduction. This Environmental Assessment (EA) provides information and analyses of proposed U.S. Department of Energy (DOE) activities associated with constructing and operating a new Physical Sciences Facility (PSF) complex on DOE property located in Benton County, north of Richland, Washington. The proposed PSF would replace a number of existing research laboratories in the Hanford

49

BERAC Meeting December 5-6, 2005 Washington, DC| U.S. DOE Office of Science  

Office of Science (SC) Website

5-6, 2005 Washington, DC 5-6, 2005 Washington, DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting December 5-6, 2005 Washington, DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting December 5-6, 2005 Washington, DC Agenda .pdf file (14KB) Presentations Mike Kuperberg .ppt file (68KB) and Andy Felmy .ppt file (9.8MB), EMSL Update: Reviews, Action Plan & Progress Ari Patrinos .ppt file (80KB), State of BER Warren Washington .ppt file (152KB), Discussion of the TCCRP subcommittee Report George Sgouros .pdf file (42KB), SNM, Public Comment Dan Hitchcock .ppt file (848KB), Dinner Talk, High Performance Computing

50

SFCD Environmental Assessment for Future Development on the South Federal Campus, Pacific Northwest National Laboratory, Richland, Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Environmental Assessment for Future Development on the South Federal Campus, Pacific Northwest National Laboratory, Richland, Washington U.S. Department of Energy Pacific Northwest Site Office Richland, Washington 99352 May 2013 DOE/EA-1958 U.S. Department of Energy DRAFT This page intentionally left blank. Environmental Assessment May 2013 DOE/EA-1958 U.S. Department of Energy DRAFT Summary The Pacific Northwest National Laboratory (PNNL) is a multi-program U.S. Department of Energy- Office of Science (DOE-SC) national laboratory conducting research to meet DOE strategic objectives. To enable continued research support, DOE-SC is proposing to construct new facilities and infrastructure

51

UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Washington, DC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November November 8, 2010 MEMORANDUM FOR HEADS OF DEPARTMENTS AND AGENCIES FROM: JOHN BERRY \ (\ .~ .. (t"t-..~ DIRECTOR \~Ii" \"'b' ~ U Subject:ModelStrategiesfor RQitment andHiringof PeoplewithDisabilitiesas Required UnderExecutiveOrder 13548 On July 26,2010, President Obama issued Executive Order (EO) 13548, which directs Executive departments and agencies (agencies) to improve their efforts to employ Federal workers with disabilities and targeted disabilities through increased recruitment, hiring, and retention of these individuals. OPM, in consultation with the White House, the Department of Labor (DOL), the Equal Employment Opportunity Commission (EEOC), and the Office of Management and Budget (OMB), has developed, as required by the EO, model recruitment and hiring strategies for agencies to use to increase their employment of people with disabilities.

52

BERAC Meeting December 3-4, 2002 Washington, DC | U.S. DOE Office of  

Office of Science (SC) Website

3-4, 2002 Washington, DC 3-4, 2002 Washington, DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting December 3-4, 2002 Washington, DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting December 3-4, 2002 Washington, DC Agenda .pdf file (6KB) Presentations Genomes to Life Facilities Marvin Frazier, DOE .ppt file (5.0MB), User Facilities for 21st Century Systems Biology Eric Ackerman, PNNL .ppt file (1.9MB), Facility I: Production and Characterization of Proteins Michelle Buchanan, ORNL .ppt file (4.3MB), Facility II: Whole Proteome Analysis Lee Makowski, ANL .ppt file (8.5MB), Characterization and Imaging of

53

BERAC Meeting July 10-11, 2006 Washington, DC | U.S. DOE Office of Science  

Office of Science (SC) Website

July 10-11, 2006 Washington, DC July 10-11, 2006 Washington, DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting July 10-11, 2006 Washington, DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting July 10-11, 2006 Washington, DC Agenda .pdf file (14KB) Presentations James Tiedje .ppt file (123KB), Discussion of Final Report of the BERAC Review of the JGI Jim Bristow .ppt file (2.8MB), JGI, Progress in addressing BERAC Recommendations Jeff Gaffney .pdf file (6.6MB), ANL, Reconfigured Atmospheric Science Program and the 2006 Mexico City Campaign David Thomassen .ppt file (119KB), State of BER Mike Kuperberg .ppt file (9.8MB), Introduction to EMSL

54

BERAC Meeting November 29-30, 2007 Washington, DC | U.S. DOE Office of  

Office of Science (SC) Website

November 29-30, 2007 Washington, DC November 29-30, 2007 Washington, DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting November 29-30, 2007 Washington, DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting November 29-30, 2007 Washington, DC Agenda .pdf file (9KB) Presentations BER Updates on BERAC Reports Jeff Amthor .ppt file (11.5MB), Free Air Carbon Dioxide Enrichment (FACE) Report Bob Vallario .ppt file (749KB), Integrated Assessment Program Report David Thomassen .ppt file (651KB), Climate Change Committee of Visitors Report Update on BERAC Charges Jim Adelstein .ppt file (785KB), Low Dose Program Review

55

BERAC Meeting November 13-14, 2003 Washington, DC | U.S. DOE Office of  

Office of Science (SC) Website

13-14, 2003 Washington, DC 13-14, 2003 Washington, DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting November 13-14, 2003 Washington, DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting November 13-14, 2003 Washington, DC Agenda .pdf file (12KB) Presentations Mark Humayun .ppt file (8.4MB), The Artificial Retina Project Chris Stubbs .ppt file (10.7MB), Computational Aspects of Medical Imaging Pat Dehmer .ppt file (34.2MB), Nanoscience and Hydrogen Initiatives Jim Mahoney .ppt file (761KB), The U.S. Climate Change Science Program: Strategic Planning to Implementation David Conover .ppt file (573KB), U.S. Climate Change Technology Program

56

BERAC Meeting April 20-21, 2005 Washington DC | U.S. DOE Office of Science  

Office of Science (SC) Website

April 20-21, 2005 Washington DC April 20-21, 2005 Washington DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting April 20-21, 2005 Washington DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting April 20-21, 2005 Washington DC Agenda .pdf file (15KB) Presentations Ray Orbach .ppt file (134KB), Advancing Energy, Economic and National Security... Dave Bader .ppt file (36KB), Subcommittee Report on the Need for Enhanced Research on Cloud Parameterization Methods... Peter Lunn .ppt file (215KB), Status Report on Restructuring of Aerosol Research Program Jerry Elwood .ppt file (552KB), New Charge to Review Terrestrial Carbon

57

BERAC Meeting April 29-30, 2004 Washington DC | U.S. DOE Office of Science  

Office of Science (SC) Website

29-30, 2004 Washington DC 29-30, 2004 Washington DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting April 29-30, 2004 Washington DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting April 29-30, 2004 Washington, DC Agenda .pdf file (15KB) Presentations Ray Orbach .ppt file (1.5MB) Ari Patrinos .ppt file (72.2MB), The State of BER Jill Banfield .ppt file (20.5MB), Structure, Reactivity, and Behavior of Nanoparticles in the Environment Steve Larson .ppt file (420KB), Radiopharmaceutical Subcommittee Report Joel Parriott/Bill Valdez .ppt file (710KB), Program Plans and Program Assessment Rating Tool (PART) Roadmaps

58

EERE: Golden Field Office Public Reading Room - FINAL Environmental...  

NLE Websites -- All DOE Office Websites (Extended Search)

EA Cancellation (PDF 90 KB) Washington Department of Commerce-Nippon Paper Biomass Cogeneration Project - (DOEEA 1858) Notice of Availability (PDF 1.4 MB) Environmental...

59

Independent Oversight Review, Oak Ridge Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Review, Oak Ridge Office of Environmental Independent Oversight Review, Oak Ridge Office of Environmental Management - February 2012 Independent Oversight Review, Oak Ridge Office of Environmental Management - February 2012 February 2012 Review of the Implementation Verification Review Processes at the Oak Ridge Office of Environmental Management for Building 3019 This report documents the independent review of implementation verification review (IVR) processes at the Oak Ridge Office of Environmental Management (ORO-EM) conducted by the Office of Enforcement and Oversight (Independent Oversight) within the Office of Health, Safety and Security (HSS). The review involved evaluation of established IVR processes and implementation of the newly revised documented safety analysis (DSA) and technical safety

60

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

k-& +gj --%- Washington, DC 20545 Mr. Carl Schafer Director of Environmental Policy Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C....

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 19, 2011 January 19, 2011 CX-005033: Categorical Exclusion Determination Oil Cleanup in 100-NR-2 CX(s) Applied: B6.1 Date: 01/19/2011 Location(s): Hanford, Washington Office(s): Environmental Management, Office of River Protection-Richland Office January 19, 2011 CX-005032: Categorical Exclusion Determination Waste Encapsulation and Storage Facility Ventilation System Replacement CX(s) Applied: B2.5 Date: 01/19/2011 Location(s): Hanford, Washington Office(s): Environmental Management, Office of River Protection-Richland Office January 13, 2011 CX-005034: Categorical Exclusion Determination Provide Power to Existing River Discharge and Monitoring System, 331 Facility, Hanford Site CX(s) Applied: B2.5 Date: 01/13/2011 Location(s): Hanford, Washington Office(s): Environmental Management, Office of River Protection-Richland

62

Washington,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DC 20585 December 20, 2005 MEMORANDUM FOR THE ADMINISTRATOR, NATIONAL NUCLEAR SECURITY ADMINISTRATION CHIEF FINANCIAL OFFICER DIRECTOR, OFFICE OF MANAGEMENT FROM: William S. Maharay Deputy Inspector General for Audit Services Office of Inspector General SUBJECT: Audit Report on "Federal Managers' Financial Integrity Act" Audit Report No.: OAS-L-06-04 We reviewed selected aspects of the Department.of Energy's (Department) implementation of the Federal Managers' Financial Integrity Act (FMFIA) of 1982. FMFIA requires that agencies establish management control and financial systems to provide reasonable assurance that the integrity of Federal programs and operations is protected. Furthermore, it requires that the head of the agency provide an annual assurance statement on whether the agency has met this

63

Office of Legacy Management Significant Environmental Aspects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9/2013 9/2013 Office of Legacy Management Significant Environmental Aspects The mission of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) is to safely manage DOE's postclosure responsibilities and ensure the future protection of human health and the environment. We have evaluated all of our activities for their potential impact on the environment, and we have identified those aspects that could have a significant impact if they were not controlled. This information is used to develop programs to prevent or mitigate potential impacts and to establish prioritized goals, objectives, and targets for continually improving performance. Our significant environmental aspects fall into four categories: * Waste generation and minimization

64

Office of Environmental Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Environmental Management Office of Environmental Management EM Newsletter - 2013 Accomplishments Issue Vol. 5, Issue 12, December 2013 Read more EM Waste Isolation Pilot Plant Team's Holiday Spirit Shines Children in the Carlsbad area are warmer this holiday season thanks to the generosity of EM's Waste Isolation Pilot Plant team of employees. Read more EM's Budget Proposal EM's Fiscal Year 2014 Budget Request Read more SRS Waste Tanks 5 and 6 Are Operationally Closed Savannah River Remediation (SRR), the liquid waste contractor at the U.S. Department of Energy (DOE), has removed from service two more Cold War-era liquid radioactive waste tanks. Read more Energy Department Completes K-25 Gaseous Diffusion Building Demolition The five year demolition project was completed ahead of schedule and all

65

Office of Environmental Management | Department of Energy  

Office of Environmental Management (EM)

Office of Environmental Management Office of Environmental Management EM's Budget Proposal EM's Fiscal Year 2014 Budget Request Read more EM Waste Isolation Pilot Plant Team's Holiday Spirit Shines Children in the Carlsbad area are warmer this holiday season thanks to the generosity of EM's Waste Isolation Pilot Plant team of employees. Read more EM Newsletter Vol. 5, Issue 12, December 2013 Read more SRS Waste Tanks 5 and 6 Are Operationally Closed Savannah River Remediation (SRR), the liquid waste contractor at the U.S. Department of Energy (DOE), has removed from service two more Cold War-era liquid radioactive waste tanks. Read more Energy Department Completes K-25 Gaseous Diffusion Building Demolition The five year demolition project was completed ahead of schedule and all debris shipments are expected to be completed in spring 2014.

66

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 30, 2009 September 30, 2009 CX-000477: Categorical Exclusion Determination Install a Photovoltaic Power Generation Array and Electric Car Charging Stations, Environmental Molecular Sciences Laboratory CX(s) Applied: B1.15 Date: 09/30/2009 Location(s): Richland, Washington Office(s): Science, Pacific Northwest Site Office September 23, 2009 CX-000476: Categorical Exclusion Determination 331 Building Irrigation Upgrades, 300 Area CX(s) Applied: B2.5 Date: 09/23/2009 Location(s): Richland, Washington Office(s): Science, Pacific Northwest Site Office September 16, 2009 EIS-0183: DOE Notice of Availability of the Record of Decision Electrical Interconnection of the Kittitas Valley Wind Project September 15, 2009 EIS-0312: Record of Decision Washington-Action Agency Estuary Habitat Memorandum of Agreement

67

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16, 2010 16, 2010 CX-003457: Categorical Exclusion Determination Sidewall Coring of Single-Shell Tank 241-A-106 CX(s) Applied: A9, B3.1, B3.11 Date: 08/16/2010 Location(s): Richland, Washington Office(s): Environmental Management, Office of River Protection-Richland Office August 13, 2010 CX-004960: Categorical Exclusion Determination Boeing Research and Technology -Low-Cost, High-Energy Density Flywheel Storage Grid CX(s) Applied: B3.6 Date: 08/13/2010 Location(s): Kent, Washington Office(s): Advanced Research Projects Agency - Energy August 12, 2010 CX-003624: Categorical Exclusion Determination Replacement of Twenty 22-L Structures on the Satsop-Aberdeen Number 2 230-kilovolt Transmission Line CX(s) Applied: B1.3 Date: 08/12/2010 Location(s): Gray's Harbor County, Washington

68

Office of Environmental Policy and Assistance - Mission and Functions  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Policy and Assistance (HS-22) Environmental Policy and Assistance (HS-22) Reports to the Office of Environmental Protection, Sustainability Support & Corporate Safety Analysis Mission The Office of Environmental Policy and Assistance establishes environmental protection policy, requirements and expectations for the Department to ensure that the environment is adequately protected from hazards associated with DOE environmental risks and impacts are minimized and compliant with environmental protection laws, regulations and standards are achieved. The Office works proactively with headquarters and field offices to foster continuous improvement and shape behavior in environmental protection before incidents occur. The Office serves as a corporate technical assistance, coordination, and integration resource to support line organizations in the resolution of environmental issues and management concerns. In addition, the Office provides high-quality, customer-oriented assistance that enables improved DOE program and field implementation of environmental protection.

69

Office of Environmental Management's Hanford Site Awards $99M Contract to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Management's Hanford Site Awards $99M Environmental Management's Hanford Site Awards $99M Contract to Small Business Office of Environmental Management's Hanford Site Awards $99M Contract to Small Business Small businesses are the backbone of our economy, employing half of all workers in America and creating two out of every three new jobs in the U.S. The Office of Environmental Management's Hanford Site awarded a $99 million contract (approximate value) to a minority-owned, women-owned, certified small business. The HPM Corporation of Kennewick, Washington, will provide Occupational Medical Services for the nearly 8,000 employees who work for Hanford Site contractors, Energy Department Offices, and others working at the Hanford Site. HPM Corporation, founded in 2001, will be responsible for operating and

70

Department of Energy Office of Science Pacific Northwest Site Office Environmental Monitoring Plan for the DOE-SC PNNL Site  

SciTech Connect

The Pacific Northwest Site Office (PNSO) manages the contract for operations at the U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest National Laboratory (PNNL) Site in Richland, Washington. Radiological operations at the DOE-SC PNNL Site expanded in 2010 with the completion of facilities at the Physical Sciences Facility. As a result of the expanded radiological work at the site, the Washington State Department of Health (WDOH) has required that offsite environmental surveillance be conducted as part of the PNNL Site Radioactive Air Emissions License. The environmental monitoring and surveillance requirements of various orders, regulations, and guidance documents consider emission levels and subsequent risk of negative human and environmental impacts. This Environmental Monitoring Plan (EMP) describes air surveillance activities at the DOE-SC PNNL Site. The determination of offsite environmental surveillance needs evolved out of a Data Quality Objectives process (Barnett et al. 2010) and Implementation Plan (Snyder et al. 2010). The entire EMP is a compilation of several documents, which include the Main Document (this text), Attachment 1: Sampling and Analysis Plan, Attachment 2: Data Management Plan, and Attachment 3: Dose Assessment Guidance.

Snyder, Sandra F.; Meier, Kirsten M.; Barnett, J. M.; Bisping, Lynn E.; Poston, Ted M.; Rhoads, Kathleen

2011-12-21T23:59:59.000Z

71

Department of Energy Office of Environmental Management: Historically Black  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Office of Environmental Management: Department of Energy Office of Environmental Management: Historically Black Colleges and Universities July 2009 Department of Energy Office of Environmental Management: Historically Black Colleges and Universities July 2009 A presentation at the 10th Annual Small Business Conference and Expo, given by the Office of Environmental Management, to share information about the Office of Environmental Management and ways small businesses can help them meet their goals. Department of Energy Office of Environmental Management: Historically Black Colleges and Universities July 2009 More Documents & Publications Recovery Act Exceeds Major Cleanup Milestone, DOE Complex Now 74 Percent Remediated Office of Environmental Management: A Journey to Excellence Regional Small Business Summit Material

72

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 13, 2010 October 13, 2010 CX-004253: Categorical Exclusion Determination Northwest Natural Devine Road Land Use Review Request CX(s) Applied: B4.9 Date: 10/13/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration October 13, 2010 CX-004252: Categorical Exclusion Determination Replace Two Broken Transformers Near the Roza Dam Adult Trap Facility CX(s) Applied: B4.6 Date: 10/13/2010 Location(s): Kittitas County, Washington Office(s): Bonneville Power Administration October 8, 2010 EIS-0456: Final Environmental Impact Statement Cushman Hydroelectric Project (FERC Project No. 460) October 8, 2010 EIS-0456: Final Environmental Impact Statement (Appendices) Cushman Hydroelectric Project (FERC Project No. 460), Washington Comments and responses to DEIS-0456: Cushman Hydroelectric Project.

73

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2011 2, 2011 EA-1858: Mitigation Action Plan Nippon Paper Industries USA Company Biomass Cogeneration Project May 1, 2011 EA-1679: Preliminary Environmental Assessment Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington April 28, 2011 CX-005892: Categorical Exclusion Determination Columbia River Inter-Tidal Fish Commission Use of White Bluffs Boat Launch and Hanford Town Boat Ramp for Salmon Tagging CX(s) Applied: B3.8 Date: 04/28/2011 Location(s): Richland, Washington Office(s): Environmental Management, Office of River Protection-Richland Office April 26, 2011 CX-005891: Categorical Exclusion Determination 200 Area Tank Farm Interim Surface Barriers CX(s) Applied: B6.9 Date: 04/26/2011 Location(s): Richland, Washington

74

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2011 8, 2011 CX-006063: Categorical Exclusion Determination Limited Firebreak Maintenance on the Hanford Site During Calendar Year 2011 CX(s) Applied: B1.3 Date: 06/28/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 24, 2011 EIS-0425: Draft Environmental Impact Statement Bonneville Power Administration Mid-Columbia Coho Restoration Project, Chelan and Okanogan Counties, WA June 24, 2011 EIS-0425: EPA Notice of Availability of Draft Environmental Impact Statement Bonneville Power Administration Mid-Columbia Coho Restoration Project, Chelan and Okanogan Counties, WA June 22, 2011 CX-006255: Categorical Exclusion Determination Indian Cabin Road Repair Date: 06/22/2011 Location(s): Skamania County, Washington Office(s): Bonneville Power Administration

75

Office of Environmental Protection, Sustainability Support & Corporate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Environmental Protection, Sustainability Support & Corporate Safety Analysis Office of Environmental Protection, Sustainability Support & Corporate Safety Analysis Mission The Office of Environmental, Sustainability and Operational Analysis establishes environmental protection requirements and expectations for the Department to ensure protection of workers and the public and protection of the environment from the hazards associated with all Department operations. The Office provides assistance to field elements in implementation of policy and resolving environmental protection issues. The Office manages and promotes mission support programs and provides analysis of Department of Energy (DOE)-wide performance in protecting the public, the workers and the environment while performing the missions of

76

HAZARD CATEGORIZATION OF ENVIRONMENTAL RESTORATION SITES AT HANFORD WASHINGTON  

SciTech Connect

Environmental restoration activities, defined here as work to identify and characterize contaminated sites and then contain, treat, remove or dispose of the contamination, now comprises a significant fraction of work in the DOE complex. As with any other DOE activity, a safety analysis must be in place prior to commencing restoration. The rigor and depth of this safety analysis is in part determined by the site's hazard category. This category in turn is determined by the facility's hazardous material inventory and the consequences of its release. Progressively more complicated safety analyses are needed as a facility's hazard category increases from radiological to hazard category three (significant local releases) to hazard category two (significant on-site releases). Thus, a facility's hazard category plays a crucial early role in helping to determine the level of effort devoted to analysis of the facility's individual hazards. Improper determination of the category can result in either an inadequate safety analysis in the case of underestimation of the hazard category, or an unnecessarily cumbersome analysis in the case of overestimation. Contaminated sites have been successfully categorized and safely restored or remediated at the former DOE production site at Hanford, Washington. This paper discusses various means used to categorize former plutonium production or support sites at Hanford. Both preliminary and final hazard categorization is discussed. The importance of the preliminary (initial) hazard categorization in guiding further DOE involvement and approval of the safety analyses is discussed. Compliance to DOE direction provided in ''Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports'', DOE-STD-1027-92, is discussed. DOE recently issued 10 CFR 830, Subpart B which codifies previous DOE safety analysis guidance and orders. The impact of 10 CFR 830, Subpart B on hazard categorization is also discussed.

BISHOP, G.E.

2001-05-01T23:59:59.000Z

77

Final Environmental Impact Statement for the Tank Waste Remediation System, Hanford Site, Richland, Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for the Tank Waste Remediation System, Hanford Site, Richland, Washington for the Tank Waste Remediation System, Hanford Site, Richland, Washington file:///I|/Data%20Migration%20Task/EIS-0189-FEIS-Summary-1996.HTM[6/27/2011 11:21:59 AM] The National Environmental Policy Act (NEPA) requires Federal agencies to analyze the potential environmental impacts of their proposed actions to assist them in making informed decisions. A similar Washington State law, the State Environmental Policy Act (SEPA), requires State agencies, including the Washington State Department of Ecology (Ecology), to analyze environmental impacts before making decisions that could impact the environment. A major emphasis of both laws is to promote public awareness of these actions and provide opportunities for public involvement. Because NEPA and SEPA requirements are similar, the U.S. Department of Energy (DOE) and Ecology

78

DOE Seeks Office Spaces for its Idaho Environmental Management...  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-ID Press Releases > Article Image layout spacer DOE Seeks Office Spaces for its Idaho Environmental Management Team The U.S. Department of Energy (DOE) is seeking local office...

79

Independent Oversight Assessment, DOE Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment, DOE Office of Environmental Assessment, DOE Office of Environmental Management Headquarters - November 2012 Independent Oversight Assessment, DOE Office of Environmental Management Headquarters - November 2012 November 2012 Assessment of Safety Culture at the U.S. Department of Energy Office of Environmental Management Headquarters The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent assessment of the safety culture1 at the DOE Office of Environmental Management (EM) - Headquarters (EM-HQ). The primary objective of the evaluation was to provide information regarding the status of the safety culture at EM-HQ. The data collection phase of the assessment occurred in April and May 2012.

80

Colorado Environmental Coalition v. Office of Legacy Management, Civil  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Colorado Environmental Coalition v. Office of Legacy Management, Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (October 18, 2011) Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (October 18, 2011) U.S. District Court's Order of October 18, 2011, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.). The Court has issued the injunctive relief described on pages 51-52 of the Order. U.S. District Court's Order of October 18, 2011, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.). More Documents & Publications Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (February 27, 2012)

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Colorado Environmental Coalition v. Office of Legacy Management, Civil  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Colorado Environmental Coalition v. Office of Legacy Management, Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (February 27, 2012) Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (February 27, 2012) U.S. District Court's Order of February 27, 2012, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.). U.S. District Court's Order of February 27, 2012, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.). More Documents & Publications Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (October 18, 2011) LG Electronics v. DOE - Defendants' Brief in Opposition to Plaintiff LG

82

Office of Environmental Management Taps Small Business for Waste...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Field Sites Power Marketing Administration Other Agencies You are here Home Office of Environmental Management Taps Small Business for Waste Isolation Pilot Plant Contract...

83

Acting Assistant Secretary for DOE Office of Environmental Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Acting Assistant Secretary for DOE Office of Environmental Management Visits Hanford - First Visit, Commemorates Completion of Major Recovery Act Project Acting Assistant Secretary...

84

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 30, 2009 September 30, 2009 CX-000477: Categorical Exclusion Determination Install a Photovoltaic Power Generation Array and Electric Car Charging Stations, Environmental Molecular Sciences Laboratory CX(s) Applied: B1.15 Date: 09/30/2009 Location(s): Richland, Washington Office(s): Science, Pacific Northwest Site Office September 23, 2009 CX-000476: Categorical Exclusion Determination 331 Building Irrigation Upgrades, 300 Area CX(s) Applied: B2.5 Date: 09/23/2009 Location(s): Richland, Washington Office(s): Science, Pacific Northwest Site Office August 19, 2009 CX-000470: Categorical Exclusion Determination Purgewater Storage and Treatment Facility Unit #1 Closure CX(s) Applied: B6.1 Date: 08/19/2009 Location(s): Benton County, Washington Office(s): Environmental Management, Office of River Protection-Richland

85

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2011 22, 2011 CX-006583: Categorical Exclusion Determination Wood Pole Replacement Along Portions of the Grand Coulee-Chief Joseph #1 and #2 230-Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13 Date: 08/22/2011 Location(s): Douglas County, Washington Office(s): Bonneville Power Administration August 22, 2011 CX-006580: Categorical Exclusion Determination Wood Pole Replacement Along the Grand Coulee-Okanogan #2 115-Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13 Date: 08/22/2011 Location(s): Grant County, Washington Office(s): Bonneville Power Administration August 18, 2011 EA-1728: Draft Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington August 15, 2011 EIS-0245-SA-03: Supplement Analysis Management of Spent Nuclear Fuel from the K Basins at the Hanford Site,

86

Independent Activity Report, Washington River Protection Solutions -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington River Protection Solutions Washington River Protection Solutions - September 2010 Independent Activity Report, Washington River Protection Solutions - September 2010 September 2010 Participation in the Washington River Protection Solutions, LLC Integrated Safety Management System Annual Review The U.S. Department of Energy, Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the review of the Washington River Protection Solutions, LLC Integrated Safety Management System Annual Review for 2010. The review was conducted during the period of August 23 to September 2, 2010, and focused on six functional areas: corrective action management, work planning and control, radiological protection, environmental protection, emergency preparedness, and

87

Mission & Functions Statement for the Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE))

The mission of the Office of Environmental Management (EM) is to complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government...

88

The Office of Environmental Management technical reports: A bibliography  

Science Conference Proceedings (OSTI)

The Office of Environmental Management`s (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1994 through June 30, 1995. This information is divided into the following categories: Focus Areas, Cross-Cutting Programs, and Support Programs. In addition, a category for general information is included. EM`s Office of Science and Technology sponsors this bibliography.

NONE

1996-01-01T23:59:59.000Z

89

Biological and Environmental Research User Facilities | U.S. DOE Office of  

Office of Science (SC) Website

BER User Facilities BER User Facilities User Facilities ASCR User Facilities BES User Facilities BER User Facilities FES User Facilities HEP User Facilities NP User Facilities User Facilities Frequently Asked Questions User Facility Science Highlights Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 BER User Facilities Print Text Size: A A A RSS Feeds FeedbackShare Page The Biological & Environmental Research program supports the operation of the following national scientific user facilities: William R. Wiley Environmental Molecular Sciences Laboratory (EMSL): External link The mission of the EMSL at the Pacific Northwest National Laboratory (PNNL) External link in Richland, Washington, is to provide integrated experimental and

90

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28, 2011 28, 2011 EIS-0423: Final Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury January 28, 2011 CX-005134: Categorical Exclusion Determination Provision of Funds to the Yakama Nation for the Purchase of Three Parcels of Property Along Reecer Creek CX(s) Applied: B1.25 Date: 01/28/2011 Location(s): Kittitas County, Washington Office(s): Bonneville Power Administration January 28, 2011 EIS-0423: EPA Notice of Availability of the Final Environmental Impact Statement Long -Term Management and Storage of Elemental Mercury January 21, 2011 CX-005130: Categorical Exclusion Determination Ringold Substation Structure Replacement Project CX(s) Applied: B4.6 Date: 01/21/2011 Location(s): Basin City, Washington Office(s): Bonneville Power Administration

91

ENVIRONMENTAL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

797 797 FINAL ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE FOR THE AGUA CALIENTE SOLAR PROJECT IN YUMA COUNTY, ARIZONA U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 November 2010 TABLE OF CONTENTS Section Page Executive Summary .................................................................................................................ES-1 Introduction ..........................................................................................................................ES-1 Purpose and Need ...............................................................................................................ES-1 Proposed Action and Alternatives........................................................................................ES-2

92

Office of Environmental Management FY 2011 Budget Request  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on 20 Years of Cleanup Progress: on 20 Years of Cleanup Progress: Investments to sustain risk reduction and strengthen technology Office of Environmental Management Office of Environmental Management FY 2011 Budget Request FY 2011 Budget Request Dr. Inés Triay Dr. Inés Triay Assistant Secretary Assistant Secretary Office of Environmental Management Office of Environmental Management February 2010 Building on 20 Years of Cleanup Progress: Investments to sustain risk reduction and strengthen technology Chief Business Chief Technical Assistant Secretary Principal Deputy Assistant Secretary EM has embarked on a Journey to Excellence 2 Our Vision: "EM completes quality work safely, on schedule and within cost and delivers demonstrated value to the American taxpayer." Chief Business Officer

93

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 28, 2010 April 28, 2010 CX-002135: Categorical Exclusion Determination Barr-Tech - Green Waste To Renewable Energy CX(s) Applied: B5.1 Date: 04/28/2010 Location(s): Sprague, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 27, 2010 CX-002236: Categorical Exclusion Determination C-Farm Electrical, Lighting, and Walkway Upgrades CX(s) Applied: B1.13, B2.1, B1.3 Date: 04/27/2010 Location(s): Richland, Washington Office(s): Environmental Management, Office of River Protection-Richland Office April 23, 2010 CX-002213: Categorical Exclusion Determination Spacer replacement along the Hanford-Wautoma #1 and #2 (substation to substation) transmission lines CX(s) Applied: B1.3 Date: 04/23/2010 Location(s): Benton County, Washington Office(s): Bonneville Power Administration

94

Testimony by J. William Currie, Ph.D Manager, Energy Systems Modernization Office, Battelle, Pacific Northwest Laboratories before The Senate Committee on Governmental Affairs Washington D.C.  

Science Conference Proceedings (OSTI)

This report consists of the testimony by J. William Currie, Manager, Energy Systems Modernization Office, Battelle, Pacific Northwest Laboratories before The Senate Committee on Governmental Affairs, Washington, DC on February 18, 1992. He states ``It is a pleasure to have the opportunity to talk with this distinguished committee about energy conservation technologies and policies, especially as they relate to federal energy use and the commercialization of energy-efficiency technologies. Clearly, using energy more efficiently offers the potential for tremendous cost savings and environmental benefits in the United States and throughout the rest of the world. The challenge, especially with regard to the federal sector, is to lay the foundation for ensuring that the citizens of our nation realize the maximum savings and environmental benefit over the long run. This is the primary focus of my comments today.``

Currie, J.W.

1992-02-18T23:59:59.000Z

95

Testimony by J. William Currie, Ph. D Manager, Energy Systems Modernization Office, Battelle, Pacific Northwest Laboratories before The Senate Committee on Governmental Affairs Washington D. C  

SciTech Connect

This report consists of the testimony by J. William Currie, Manager, Energy Systems Modernization Office, Battelle, Pacific Northwest Laboratories before The Senate Committee on Governmental Affairs, Washington, DC on February 18, 1992. He states It is a pleasure to have the opportunity to talk with this distinguished committee about energy conservation technologies and policies, especially as they relate to federal energy use and the commercialization of energy-efficiency technologies. Clearly, using energy more efficiently offers the potential for tremendous cost savings and environmental benefits in the United States and throughout the rest of the world. The challenge, especially with regard to the federal sector, is to lay the foundation for ensuring that the citizens of our nation realize the maximum savings and environmental benefit over the long run. This is the primary focus of my comments today.''

Currie, J.W.

1992-02-18T23:59:59.000Z

96

FTCP Site Specific Information - Office of Environmental Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management FTCP Site Specific Information - Office of Environmental Management FTCP Agent Organization Name Phone E-Mail EM HQ Todd Lapointe 202-586-4653 Todd.Lapointe@em.doe.gov...

97

The Office of Environmental Management Uranium Enrichment D&D...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Uranium Enrichment D&D The Office of Environmental Management Uranium Enrichment D&D Microsoft Word - B996F741.doc More Documents & Publications Microsoft Word - PSRP Updates...

98

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY WASHINGTON D.C. 20460  

E-Print Network (OSTI)

to update the environmental protection standards for uranium mining because current regulations, promulgated monitoring networks at ISL uranium mines, including wells within the production area to compare post- and pre preliminary framework of considerations applicable to groundwater monitoring at ISL uranium mines

99

Final Environmental Impact Statement Plymouth Generating Facility Plymouth, Washington  

SciTech Connect

Plymouth Energy, L.L.C. (Plymouth Energy) proposes to construct and operate the Plymouth Generating Facility (PGF), which would be a 307-megawatt (MW) natural gas-fired, combined cycle power generation facility on a 44.5-acre site 2 miles west of the rural community of Plymouth in southern Benton County, Washington. Plymouth Energy has proposed that the PGF would be interconnected to the Bonneville Power Administration's (BPA's) proposed McNary-John Day 500-kilovolt (kV) transmission line at a point approximately 4.7 miles west of BPA's McNary Substation. This tie-in to the McNary-John Day line would be approximately 0.6 mile to the north of the project site. Natural gas would be supplied to the project by an 800-foot pipeline lateral from the Williams Northwest Gas Pipeline Company (Williams Co.) Plymouth Compressor Station, which is located adjacent to the plant site. Water for project use would be supplied from a groundwater well whose perfected rights have been transferred to the project. A small additional quantity of water to meet plant peak needs would be obtained by lease from the neighboring farm operation. Wastewater resulting from project operations would be supplied to the neighboring farm for blending with farm-supplied water, and then used for crop irrigation. Electricity generated by the PGF would be delivered to the BPA electric grid via a new transmission interconnection for transmission of energy to regional purchasers of electricity.

N /A

2003-06-20T23:59:59.000Z

100

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2011 0, 2011 CX-006068: Categorical Exclusion Determination Site Characterization and Environmental Monitoring CX(s) Applied: B3.1 Date: 06/20/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 14, 2011 Massive Cement Pour into Hanford Site Nuclear Facility Underway: Recovery Act Funding Puts U Canyon in Home Stretch of Demolition Preparations RICHLAND, Wash. - Hanford workers are pouring enough cement-like material to fill six Olympic-size swimming pools in one of the U.S. Department of Energy's (DOE) largest nuclear facilities at the Hanford Site in southeast Washington State to prepare the massive building for demolition. June 14, 2011 CX-006253: Categorical Exclusion Determination North Bonneville-Ross #1 230-Kilovolt, North Bonneville-Troutdale #2

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Memorandum: Revised Guidance for the Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revised Guidance for the Office of Environmental Revised Guidance for the Office of Environmental Management Site Specific Advisory Boards Memorandum: Revised Guidance for the Office of Environmental Management Site Specific Advisory Boards From: Assistant Secretary, Jessie H. Roberson (EM-1) To: SSAB Members (J. Bierer, T. Martin, M. Wilson, P. Claire, J. Brannon, D. Mosby, B. Tanner, V. Holm, W. Waters) The purpose of this memorandum is to provide guidance and direction for restructuring and managing the Environmental Management (EM) Site Specific Advisory Boards procurement mechanisms that support activities of the Boards. Roberson Memorandum - July 7, 2003 More Documents & Publications Letter: Implementation of the Guidance for the Environmental Management Site Specific Advisory Boards Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding

102

The Office of Environmental Management technical reports: a bibliography  

SciTech Connect

The Office of Environmental Management`s (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1995 through Sept. 30, 1996. This information is divided into the following categories: Focus Areas and Crosscutting Programs. Support Programs, Technology Integration and International Technology Exchange are now included in the General category. EM`s Office of Science and Technology sponsors this bibliography.

NONE

1997-07-01T23:59:59.000Z

103

Expanded public notice: Washington State notice of intent for corrective action management unit, Hanford Environmental Restoration Disposal  

SciTech Connect

This document is to serve notice of the intent to operate an Environmental Restoration Disposal Facility (ERDF), adjacent to the 200 West Area of the Hanford Facility, Richland, Washington, as a Corrective Action Management Unit (CAMU), in accordance with 40 Code of Federal Regulation (CFR) 264.552. The ERDF CAMU will serve as a management unit for the majority of waste (primarily soil) excavated during remediation of waste management sites on the Hanford Facility. Only waste that originates from the Hanford Facility can be accepted in this ERDF CAMU. The waste is expected to consist of dangerous waste, radioactive waste, and mixed waste. Mixed waste contains radioactive and dangerous components. The primary features of the ERDF could include the following: one or more trenches, rail and tractor/trailer container handling capability, railroads, an inventory control system, a decontamination building, and operational offices.

Not Available

1994-01-01T23:59:59.000Z

104

Washington DC Regions | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Washington DC Regions Washington DC Regions National Science Bowl® (NSB) NSB Home About High School Middle School Middle School Students Middle School Coaches Middle School Regionals Middle School Rules, Forms, and Resources Attending National Event Volunteers 2013 Competition Results News Media WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: 202-586-6702 E: National.Science.Bowl@science.doe.gov Middle School Regionals Washington DC Regions Print Text Size: A A A RSS Feeds FeedbackShare Page Washington, DC Coaches can review the middle school regional locations listed below. Please note: Registrations are based on the location of your school. Please be sure to select the regional that is designated for your

105

Washington DC Regions | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Washington DC Regions Washington DC Regions National Science Bowl® (NSB) NSB Home About High School High School Students High School Coaches High School Regionals High School Rules, Forms, and Resources Middle School Attending National Event Volunteers 2013 Competition Results News Media WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: 202-586-6702 E: National.Science.Bowl@science.doe.gov High School Regionals Washington DC Regions Print Text Size: A A A RSS Feeds FeedbackShare Page Washington, DC Coaches can review the high school regional locations listed below. Please note: Registrations are based on the location of your school. Please be sure to select the regional that is designated for your

106

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 10, 2003 March 10, 2003 EIS-0330: Record of Decision Wallula-McNary Transmission Line Project and Wallula Power Project March 7, 2003 EA-1454: Finding of No Significant Impact Reactivation and Use of Three Former Borrow Sites in the 100-F,100-H, and 100-N Areas, Hanford Site, Richland, Washington March 6, 2003 EIS-0285-SA-128: Supplement Analysis Transmission System Vegetation Management Program March 3, 2003 EIS-0286: Draft Environmental Impact Statement Hanford Site Solid (Radioactive and Hazardous) Waste Program, Richland, Washington March 3, 2003 EIS-0286: Revised Draft Environmental Import Statement Richland Operations Office, Hanford Site Solid (Radioactive and Hazardous) Waste Program, Richland, Washington March 3, 2003 EA-1454: Final Environmental Assessment Reactivation and Use of Three Former Borrow Sites in the 100-F,100-H, and

107

The Western Environmental Technology Office (WETO), Butte, Montana, technology summary  

SciTech Connect

This document has been prepared by the DOE Environmental Management (EM) Office of Technology Development (OTD) to highlight its research, development, demonstration, testing, and evaluation activities funded through the Western Environmental Technology Office (WETO) in Butte, Montana. Technologies and processes described have the potential to enhance DOE`s cleanup and waste management efforts, as well as improve US industry`s competitiveness in global environmental markets. WETO`s environmental technology research and testing activities focus on the recovery of useable resources from waste. Environmental technology development and commercialization activities will focus on mine cleanup, waste treatment, resource recovery, and water resource management. Since the site has no record of radioactive material use and no history of environmental contamination/remediation activities, DOE-EM can concentrate on performing developmental and demonstration activities without the demands of regulatory requirements and schedules. Thus, WETO will serve as a national resource for the development of new and innovative environmental technologies.

Not Available

1994-09-01T23:59:59.000Z

108

Energy' TEfl9 Associated Post Office Box 117  

Office of Legacy Management (LM)

Division Office of Environmental Restoration and Waste Management U.S. Department of Energy Washington, DC 20545 Subject: DRAFT VERIFICATION SURVEY OF PARCEL 1A ELZA GATE SITE,...

109

Department of Energy Environmental Management Office of Science and Technology  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Environmental Management Office of Environmental Management International Cooperative Program: Current Status and Plans for Expansion Office of Waste Processing Technical Exchange Denver, CO K. D. Gerdes and A. M. Han Office of Environmental Management U.S. Department of Energy and J. C. Marra*, K. M. Fox*, D. K. Peeler*, M. E. Smith*, G. T. Jannik*, E. B. Farfan*, D. S. Kim**, J. D. Vienna**, J. A. Roach***, A. S. Aloy+, S. V. Stefanovsky++, M. D. Bondarkov+++, D. B. Lopukh‡ and C. W. Kim‡‡ *Savannah River National Laboratory, **Pacific Northwest National Laboratory, ***Idaho National Laboratory, +Khlopin Radium Institute, St. Petersburg, Russia ++SIA Radon Institute, Moscow, Russia, +++International Radioecology Laboratory, Slavutych, Ukraine, ‡Electrotechnical University, St. Petersburg, Russia,

110

The Office of Environmental Management technical reports: A bibliography  

Science Conference Proceedings (OSTI)

The Office of Environmental Management`s (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1995--that were published from October 1, 1996--September 30, 1997. This information is divided into the following categories: Miscellaneous, Focus Areas and Crosscutting Programs, Support Programs, Technology Integration and International Technology Exchange, are now included in the Miscellaneous category. The Office of Environmental Management within the Department of Energy (DOE) is responsible for environmental restoration, waste management, technology development and facility transition and management. Subjects include: subsurface contaminants; mixed waste characterization, treatment and disposal; radioactive tank waste remediation; plutonium; deactivation and decommissioning; robotics; characterization, monitoring, and sensor technology; and efficient separations. 880 refs.

NONE

1998-07-01T23:59:59.000Z

111

Energy Office Grant Helps the Virgin Islands Environmental Resource Station  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office Grant Helps the Virgin Islands Environmental Resource Office Grant Helps the Virgin Islands Environmental Resource Station Install Solar Panels, Improve Efficiency, and Cut Monthly Energy Use Nearly 30% (Fact Sheet), Energy Development in Island Nations, U.S. Virgin Islands (EDIN) Energy Office Grant Helps the Virgin Islands Environmental Resource Station Install Solar Panels, Improve Efficiency, and Cut Monthly Energy Use Nearly 30% (Fact Sheet), Energy Development in Island Nations, U.S. Virgin Islands (EDIN) This fact sheet highlights the energy challenges faced by the Virgin Islands Environmental Resource Station, the renewable energy and energy efficiency solutions implemented, the resulting energy efficiency savings, and other project benefits. 54376.pdf More Documents & Publications USVI Energy Road Map: Charting the Course to a Clean Energy Future

112

Office of Environmental Management Taps Small Business for Waste Isolation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Management Taps Small Business for Waste Environmental Management Taps Small Business for Waste Isolation Pilot Plant Contract Office of Environmental Management Taps Small Business for Waste Isolation Pilot Plant Contract August 29, 2012 - 4:54pm Addthis A stratigraph of the Waste Isolation Pilot Plant's underground layers, where Transuranic waste is safely stored. A stratigraph of the Waste Isolation Pilot Plant's underground layers, where Transuranic waste is safely stored. John Hale III John Hale III Director, Office of Small and Disadvantaged Business Utilization This week, Celeritex, LLC landed a contract worth up to $17.8 million with the Office of Environmental Management, having demonstrated through a competetive process that this small business is up to the task of securing and isolating defense-generated Transuranic waste.

113

Washington Wildlife Mitigation Projects : Final Programmatic Environmental Assessment and Finding of No Significant Impact.  

DOE Green Energy (OSTI)

Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities.

United States. Bonneville Power Administration; Washington (State). Dept. of Fish and Wildlife.

1996-08-01T23:59:59.000Z

114

DOE - Office of Legacy Management -- University of Washington - WA 0-01  

Office of Legacy Management (LM)

Washington - WA 0-01 Washington - WA 0-01 FUSRAP Considered Sites Site: UNIVERSITY OF WASHINGTON (WA.0-01) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Seattle , Washington WA.0-01-1 Evaluation Year: 1987 WA.0-01-1 Site Operations: Research activities involving small quantities of radioactive materials in a controlled environment. WA.0-01-1 Site Disposition: Eliminated - Potential for residual radioactive contamination considered remote - Operating under active NRC license WA.0-01-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: None Indicated WA.0-01-1 Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP Also see

115

EXECUTIVE OFFICE OF THE PRESIDENT COUNCIL ON ENVIRONMENTAL QUALITY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 May 12, 2010 MEMORANDUM FOR HEADS OF FEDERAL DEPARTMENTS AND AGENCIES FROM: Nancy H. Sutley Chair SUBJECT: Emergencies and the National Environmental Policy Act With this Memorandum, the Council on Environmental Quality (CEQ) reiterates its previous guidance on the National Environmental Policy Act (NEPA) environmental review of proposed emergency response actions. [1] This memorandum clarifies that the previous guidance remains applicable to current situations and provides guidance on required agency environmental review. Agencies should distribute this guidance to field offices developing and taking actions in response to emergencies along with the agency's relevant guidance on emergency actions and NEPA.

116

Seven Small Businesses Awarded Contracts by the Office of Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Seven Small Businesses Awarded Contracts by the Office of Seven Small Businesses Awarded Contracts by the Office of Environmental Management Seven Small Businesses Awarded Contracts by the Office of Environmental Management June 19, 2012 - 2:45pm Addthis Large nuclear material processing tanks, like the one destined for Savannah River Site's (SRS) Salt Waste Processing Facility, will be managed with the support of qualified small businesses. Large nuclear material processing tanks, like the one destined for Savannah River Site's (SRS) Salt Waste Processing Facility, will be managed with the support of qualified small businesses. Dot Harris Dot Harris The Honorable Dot Harris, Director, Office of Economic Impact and Diversity Today the Energy Department announced contract awards to seven small-disadvantaged businesses to perform critical technical

117

Seven Small Businesses Awarded Contracts by the Office of Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Seven Small Businesses Awarded Contracts by the Office of Seven Small Businesses Awarded Contracts by the Office of Environmental Management Seven Small Businesses Awarded Contracts by the Office of Environmental Management June 19, 2012 - 2:45pm Addthis Large nuclear material processing tanks, like the one destined for Savannah River Site's (SRS) Salt Waste Processing Facility, will be managed with the support of qualified small businesses. Large nuclear material processing tanks, like the one destined for Savannah River Site's (SRS) Salt Waste Processing Facility, will be managed with the support of qualified small businesses. Dot Harris Dot Harris The Honorable Dot Harris, Director, Office of Economic Impact and Diversity Today the Energy Department announced contract awards to seven small-disadvantaged businesses to perform critical technical

118

Hawaii Department of Health Office of Environmental Quality Control | Open  

Open Energy Info (EERE)

Office of Environmental Quality Control Office of Environmental Quality Control Jump to: navigation, search Name Hawaii Department of Health Office of Environmental Quality Control Address 235 S. Beretania Suite 702 Place Honolulu, Hawaii Zip 96813 Website http://hawaii.gov/health/envir Coordinates 21.3094485°, -157.8578603° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":21.3094485,"lon":-157.8578603,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

119

Office of Environmental Management: A Journey to Excellence  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Office of Environmental Management: A Journey to Excellence Cynthia Anderson Chief Operations Officer Office of Environmental Management May 11, 2011 Presented to: National Transportation Stakeholders Forum www.em.doe.gov 2 Goal 3: Complete the disposition of 90% of the legacy transuranic waste by 2015. Goal 2: Reduce the life cycle costs and accelerate the cleanup of the Cold War environmental legacy. Goal 1: Complete the three major tank waste projects within the current approved baselines. Goal 4: Reduce the EM legacy footprint by 40% by the end of 2011, leading to approximately 90% reduction by 2015. Goal 5: Improve safety, security and quality assurance towards a goal of zero accidents, incidents, and defects. Goal 6: Improve contract and project

120

Department of Energy Office of Nuclear Safety and Environmental Policy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Office of Nuclear Safety and Environmental Department of Energy Office of Nuclear Safety and Environmental Policy Technical Position NSEP-TP-2007- 1, Technical Position on the Requirement in DOE 0 420.1B to Use National Consensus Industry Standards and the Model Building CodesTechnical Position NS Department of Energy Office of Nuclear Safety and Environmental Policy Technical Position NSEP-TP-2007- 1, Technical Position on the Requirement in DOE 0 420.1B to Use National Consensus Industry Standards and the Model Building CodesTechnical Position NS All new construction required to follow the provisions of Department of Energy (DOE) Order 420. lB, Facility Safety, must comply with national consensus industry standards and the model building codes applicable for the state or region in which the facility is located. Certain individuals in the fire community requested

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 25, 2010 January 25, 2010 EIS-0391: Updated Notice of Public Hearings Tank Closure and Waste Management for the Hanford Site, Richland, WA January 13, 2010 CX-000471: Categorical Exclusion Determination Limited Prescribed Burning on the Hanford Site During October, November, and December of 2010 to Maintain Critical Fire Breaks CX(s) Applied: B1.3 Date: 01/13/2010 Location(s): Benton County, Washington Office(s): Environmental Management, Office of River Protection-Richland Office January 8, 2010 EIS-0391: Notice of Public Hearings Tank Closure and Waste Management for the Hanford Site, Richland, WA January 1, 2010 EIS-0222: Final Environmental Impact Statement Hanford Comprehensive Land-Use Plan December 18, 2009 EIS-0391: Notice of Modification of Preferred Alternatives

122

Environmental assessment of SP-100 ground engineering system test site: Hanford Site, Richland, Washington  

SciTech Connect

The US Department of Energy (DOE) proposes to modify an existing reactor containment building (decommissioned Plutonium Recycle Test Reactor (PRTR) 309 Building) to provide ground test capability for the prototype SP-100 reactor. The 309 Building (Figure 1.1) is located in the 300 Area on the Hanford Site in Washington State. The National Environmental Policy Act (NEPA) requires that Federal agencies assess the potential impacts that their actions may have on the environment. This Environmental Assessment describes the consideration given to environmental impacts during reactor concept and test site selection, examines the environmental effects of the DOE proposal to ground test the nuclear subsystem, describes alternatives to the proposed action, and examines radiological risks of potential SP-100 use in space. 73 refs., 19 figs., 7 tabs.

1988-12-01T23:59:59.000Z

123

Carlsbad Field Office Members Are DOE Judges at International Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carlsbad Field Office Members Are DOE Judges at International Carlsbad Field Office Members Are DOE Judges at International Environmental Design Contest Carlsbad Field Office Members Are DOE Judges at International Environmental Design Contest April 1, 2012 - 12:00pm Addthis California Polytechnic State University students test output from cyclone treatment at the 2012 WERC IEDC. California Polytechnic State University students test output from cyclone treatment at the 2012 WERC IEDC. Contestants from the University of Idaho think it through at the 2012 WERC IEDC. The annual competition includes college students from universities worldwide, who showcase their engineering design solutions. Their solutions are judged by industry and academic professionals. Contestants from the University of Idaho think it through at the 2012 WERC

124

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

i+ r*y Washington, DC 20545 Mr. Carl Schafer Director of Environmental Policy Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C. 20301...

125

BPA/Puget Power Northwest Washington Transmission Project : Summary of the Supplemental Draft Environmental Statement.  

SciTech Connect

BPA and Puget Sound Power and Light (Puget Power) are proposing to upgrade the existing electric transmission power system in the Whatcom and Skagit County area of northwest Washington to increase the capacity of the US-Canada Intertie transmission system. The project would satisfy the need to provide more ability to store and return energy with Canada, would provide additional capacity on the Intertie for anticipated increases in power transactions, and would increase flexibility in operation of the US and Canadian hydroelectric system. It would protect Puget Power`s local system against thermal overloads, and improve local reliability. In November 1993, Bonneville Power Administration (BPA), and Whatcom County (Washington) published a draft environmental impact statement (DEIS) for the proposed Northwest Washington Transmission Project. In order to present some shifts in need for the project and to permit additional review, BPA and Whatcom County have elected to issue a Supplemental Draft EIS. This Summary presents background material, explains project needs and purposes, and then focuses on alternatives and the possible effects.

United States. Bonneville Power Administration.

1995-04-01T23:59:59.000Z

126

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2011 6, 2011 CX-007504: Categorical Exclusion Determination 300 Area Nanoscale Research and Development Projects CX(s) Applied: B3.15, A9, B3.6 Date: 12/06/2011 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 1, 2011 EA-1679: Revision Sheet for Final Environmental Assessment Grand Coulee's Third Power plant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington November 18, 2011 Demolition Begins on Hanford's Historic Plutonium Vaults - Plutonium Finishing Plant on track to meet regulatory milestone RICHLAND, WASH. - The U.S. Department of Energy (DOE) and contractor CH2M HILL Plateau Remediation Company (CH2M HILL) began demolishing a vault complex that once held stores of plutonium for the U.S. nuclear weapons

127

Independent Oversight Assessment, DOE Office of Environmental Management Headquarters- November 2012  

Energy.gov (U.S. Department of Energy (DOE))

Assessment of Safety Culture at the U.S. Department of Energy Office of Environmental Management Headquarters

128

FY 2013 Budget Request Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Mission 4 Office of Environmental Management Deactivate and decommission over 5,000 facilities Protect and clean up more than 10,000 groundwater and soil sites The EM Challenge: Cleaning Up Five Decades of Nuclear Research and Weapons Production 5 Disposition nearly 1.9 million cubic meters of radioactive waste (low level/mixed low level, transuranic, and high level waste) -- enough to fill over 750 Olympic-sized swimming pools Office of Environmental Management We work with some of the most dangerous substances known to humanity... Performing first-of-a-kind tasks in highly hazardous work environments Holding basin for spent nuclear fuel Workers using glovebox to handle plutonium

129

Establishing the Office of Environmental Management Quality Assurance Corporate Board  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DISTRIBUTIO DISTRIBUTIO FROM: DAE Y. CHUNG DEPUTY ASSISTA@SECRETARY FOR SAFETY MANAGEMENT AND OPERATIONS SUBJECT: Establishing the Office of Environmental Management Quality Assurance Corporate Board The purpose of this memorandum is to introduce the Office of Environmental Management (EM) Quality Assurance (QA) Corporate Board which implements EM'S policy and guidance and promotes lessons learned and best practices across the sites. The Corporate Board provides the management structure to integrate the independently managed federal and contractor QA Programs into a single corporate entity. The Board serves as a consensus-building body to facilitate institutionalization of a QA Management System across the EM-Complex. The Corporate Board concept originated from the EM Quality Improvement Initiative in

130

Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.  

SciTech Connect

In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

United States. Bonneville Power Administration.

1994-01-01T23:59:59.000Z

131

Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement: Summary.  

SciTech Connect

BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and in comments on the Draft Environmental Impact Statement (EIS) include: (1) potential air quality impacts, such as emissions and their contribution to the {open_quotes}greenhouse{close_quotes} effect; (2) potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields; and (3) potential water quality and quantity impacts, such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial. The EIS is being mailed to numerous agencies, groups, and individuals (see Section 8.0). There will be a 30-day no-action period before any decisions are made and the Record of Decision is signed.

United States. Bonneville Power Administration.

1994-01-01T23:59:59.000Z

132

News From the D.C. Office: Energy-Saving Office Equipment Part 2  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Aerial view of Washington D.C. 3 Aerial view of Washington D.C. News From the D.C. Office Energy-Saving Office Equipment Part 2: Making the "Virtual Office" Real More on the DC Office efficiency up-grade: Lighting, Office Equipment: Part 1 Regular readers of the Center for Building Science News know that energy-efficient lighting and office equipment can have significant environmental and economic benefits. Previous articles ("Monitored Savings from Energy-Efficient Lighting in D.C. Office" [Spring 1997, p. 3] and "Energy-Saving Office equipment" [Summer 1997, p. 3]) discussed these features of Berkeley Lab's Washington, D.C. office. The D.C. office also serves as a demonstration site for telecommunications technologies, which have energy and environmental benefits of their own.

133

Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 1: Environmental Analysis and Technical Appendices.  

Science Conference Proceedings (OSTI)

BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and in comments on the Draft Environmental Impact Statement (EIS) include: (1) potential air quality impacts, such as emissions and their contribution to the {open_quotes}greenhouse{close_quotes} effect; (2) potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields; and (3) potential water quality and quantity impacts, such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial. The EIS is being mailed to numerous agencies, groups, and individuals (see Section 8.0). There will be a 30-day no-action period before any decisions are made and the Record of Decision is signed.

United States. Bonneville Power Administration.

1994-01-01T23:59:59.000Z

134

Washington: Washington's Clean Energy Resources and Economy (Brochure)  

SciTech Connect

This document highlights the Office of Energy Efficiency and Renewable Energy's investments and impacts in the state of Washington.

Not Available

2013-03-01T23:59:59.000Z

135

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2011 1, 2011 CX-006066: Categorical Exclusion Determination Outdoor Tests, Experiments on Materials and Equipment Components CX(s) Applied: B3.11 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006065: Categorical Exclusion Determination Siting, Construction, Operation and Decommissioning of Microbiological and Biomedical Facilities CX(s) Applied: B3.12 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006064: Categorical Exclusion Determination Actions to Conserve Energy CX(s) Applied: B5.1 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 20, 2011 CX-006089: Categorical Exclusion Determination

136

Transform your learning UNIVERSITY OF WASHINGTON OFFICE OF UNDERGRADUATE EDUCATION 2004-05 ANNUAL REPORT  

E-Print Network (OSTI)

in Program on the Environment's class "Choices and Change in the Arctic National Wildlife Refuge (ANWR)." After analyzing the complex issues surrounding ANWR in a campus-based seminar, Tim's class spent eight associated with ANWR. To Tim, the most urgent issues facing his generation are environmental. Studying them

Washington at Seattle, University of

137

Environmental Protection Agency Office of Small Business Programs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Protection Agency Protection Agency Office of Small Business Programs www.epa.gov/osbp DOE Kansas City, Missouri May 11, 2011 Dr. Jeanette L. Brown, Director www.epa.gov/osbp 2 Follow the Money Getting to Green EPA and OSBP Mission * The U.S. Environmental Protection Agency's (EPA) mission is to protect human health and the environment. * The Office of Small Business Programs (OSBP) supports EPA's mission by fostering opportunities for partnerships, contracts, sub-agreements, and grants for small and socioeconomically disadvantaged concerns, including their advocacy in EPA regulations & compliance. * OSBP's Green Initiative Task Force develops information, resources and tools to assist small business in going green. "Gaining Opportunities by Going Green"

138

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 23, 2010 November 23, 2010 CX-004464: Categorical Exclusion Determination Central Ferry Area Radio Communications Project CX(s) Applied: B4.6 Date: 11/01/2010 Location(s): Franklin County, Washington Office(s): Bonneville Power Administration November 19, 2010 CX-004524: Categorical Exclusion Determination Washington State University Building Upgrades and Resource Conservation Manager CX(s) Applied: A9, A11, B5.1 Date: 11/19/2010 Location(s): Clark County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 19, 2010 CX-004525: Categorical Exclusion Determination Energy Services Corps CX(s) Applied: A9, A11, B5.1 Date: 11/19/2010 Location(s): Kitsap County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

139

Environmental Sciences Division Groundwater Program Office. Annual report, 1993  

SciTech Connect

This first edition of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Annual Report summarizes the work carried out by the Energy Systems GWPO for fiscal year (FY) 1993. This introductory section describes the GWPO`s staffing, organization, and funding sources. The GWPO is responsible for coordination and oversight for all components of the groundwater program at the three Oak Ridge facilities [ORNL, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], and the PGDP and PORTS, respectively. Several years ago, Energy systems senior management recognized that the manner in which groundwater activities were conducted at the five facilities could result in unnecessary duplication of effort, inadequate technical input to decisions related to groundwater issues, and could create a perception within the regulatory agencies of a confusing and inconsistent approach to groundwater issues at the different facilities. Extensive interactions among management from Environmental Compliance, Environmental Restoration (ER), Environmental Sciences Division, Environmental Safety and Health, and the five facilities ultimately led to development of a net technical umbrella organization for groundwater. On April 25, 1991, the GWPO was authorized to be set up within ORNL thereby establishing a central coordinating office that would develop a consistent technical and administrative direction for the groundwater programs of all facilities and result in compliance with all relevant U.S. Environmental Protection Agency (EPA) regulations such as RCRA and Comprehensive Environmental Restoration, Compensation and Liability Act (CERCLA) as well as U.S. Department of Energy (DOE) regulations and orders. For example, DOE Order 5400.1, issued on November 9, 1988, called for each DOE facility to develop an environmental monitoring program for all media (e.g., air, surface water, and groundwater).

Not Available

1993-09-30T23:59:59.000Z

140

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 15, 2010 March 15, 2010 CX-001180: Categorical Exclusion Determination Monroe-Custer Number 1 and 2 500-Kilovolt Transmission Line Structure 16/2 Access Road Improvement and Bridge Replacement Project CX(s) Applied: B1.3 Date: 03/15/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration March 12, 2010 CX-006365: Categorical Exclusion Determination Washington-City-Spokane CX(s) Applied: A9, A11, B2.5, B5.1 Date: 03/12/2010 Location(s): Spokane, Washington Office(s): Energy Efficiency and Renewable Energy March 12, 2010 CX-006364: Categorical Exclusion Determination Washington-City-Pasco CX(s) Applied: A9, A11, B5.1 Date: 03/12/2010 Location(s): Pasco, Washington Office(s): Energy Efficiency and Renewable Energy March 12, 2010 CX-001182: Categorical Exclusion Determination

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Safe interim storage of Hanford tank wastes, draft environmental impact statement, Hanford Site, Richland, Washington  

Science Conference Proceedings (OSTI)

This Draft EIS is prepared pursuant to the National Environmental Policy Act (NEPA) and the Washington State Environmental Policy Act (SEPA). DOE and Ecology have identified the need to resolve near-term tank safety issues associated with Watchlist tanks as identified pursuant to Public Law (P.L.) 101-510, Section 3137, ``Safety Measures for Waste Tanks at Hanford Nuclear Reservation,`` of the National Defense Authorization Act for Fiscal Year 1991, while continuing to provide safe storage for other Hanford wastes. This would be an interim action pending other actions that could be taken to convert waste to a more stable form based on decisions resulting from the Tank Waste Remediation System (TWRS) EIS. The purpose for this action is to resolve safety issues concerning the generation of unacceptable levels of hydrogen in two Watchlist tanks, 101-SY and 103-SY. Retrieving waste in dilute form from Tanks 101-SY and 103-SY, hydrogen-generating Watchlist double shell tanks (DSTs) in the 200 West Area, and storage in new tanks is the preferred alternative for resolution of the hydrogen safety issues.

Not Available

1994-07-01T23:59:59.000Z

142

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checldist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

JO-IO JO-IO U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checldist Project/Activity: Geophysical and Seismic Investigations at the Shoal, NY, Site A. Brief Project/Activity Descl'iption The U.S. Department of Energy (DOE) Office of Legacy Management (LM) needs to further characterize the water table, evaluate the prevailing horizontal groundwater flow direction, and identify faults/major fracture zones that may affect groundwater flow and contaminant transport at the Shoal Site. The Shoal Site is located about 40 miles by road from Fallon, in Churchill County, NY. This environmental checklist evaluates two related geophysical activities. The initial geophysical work would consist of conducting a controlled-source audio

143

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-10 2-10 U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist Project/Activity: Install wells and boreholes at the Old Rifle, CO, Processing Site A. Brief Project/Activity Description The Environmental Remediation Sciences Program (ERSP) proposes to install 36 wells and 5 boreholes on the Old Rifle, CO, Processing Site. A combination of 13 injection wells, 18 monitoring wells, 5 multi-chambered wells, and 5 boreholes would be installed using a sonic rotary drill rig. Five of the wells would be used for U.S. Department of Energy (DOE) Office of Legacy Management (LM) groundwater monitoring purposes and the remainder (31 wells and 5 boreholes) would be installed in a single gallery (Super 8) to be used for research and monitoring

144

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2011 20, 2011 CX-006817: Categorical Exclusion Determination McNary-Ross No. 1 Upgrade Project, Surface Impairment Removal CX(s) Applied: B1.3 Date: 09/20/2011 Location(s): Klickitat and Clark Counties, Washington Office(s): Bonneville Power Administration September 19, 2011 CX-006840: Categorical Exclusion Determination Security Barrier Relocation at the 618-11 Burial Grounds CX(s) Applied: B1.15 Date: 09/19/2011 Location(s): Richland, Washington Office(s): River Protection-Richland Operations Office, Golden Field Office September 19, 2011 CX-006839: Categorical Exclusion Determination Training Exercises and Simulations on the Hanford Site CX(s) Applied: B1.2 Date: 09/19/2011 Location(s): Richland, Washington Office(s): River Protection-Richland Operations Office September 16, 2011

145

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 26, 2010 May 26, 2010 CX-002564: Categorical Exclusion Determination FPE Renewables, LLC CX(s) Applied: B5.1 Date: 05/26/2010 Location(s): Lynden, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 26, 2010 CX-002557: Categorical Exclusion Determination G.R. Silicate CX(s) Applied: B5.1 Date: 05/26/2010 Location(s): Hoquiam, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 21, 2010 CX-002567: Categorical Exclusion Determination Harold LeMay Enterprises, Inc. CX(s) Applied: B5.1 Date: 05/21/2010 Location(s): Pierce County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 21, 2010 CX-002563: Categorical Exclusion Determination Clark Public Utilities CX(s) Applied: B5.1

146

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2010 22, 2010 CX-002030: Categorical Exclusion Determination Solar Array and Charging Stations - Administration Building/Cathcart CX(s) Applied: B5.1 Date: 04/22/2010 Location(s): Snohomish County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 22, 2010 CX-002029: Categorical Exclusion Determination Engine Generator for Enumclaw Dairy Manure Digester CX(s) Applied: B5.1 Date: 04/22/2010 Location(s): King County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 22, 2010 CX-001830: Categorical Exclusion Determination YWCA Family Village at Issaquah CX(s) Applied: B2.1, B2.5, B5.1 Date: 04/22/2010 Location(s): King county, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

147

Directions to the Colorado Office of the Environmental Science...  

NLE Websites -- All DOE Office Websites (Extended Search)

Colorado Office The EVS Colorado office is located about 45 minutes from Denver International Airport, near the U.S. Federal Center. Argonne National Laboratory 200 Union Blvd.,...

148

EA-1096: Washington Wildlife Mitigation Projects (Programmatic), Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Washington Wildlife Mitigation Projects (Programmatic), 6: Washington Wildlife Mitigation Projects (Programmatic), Washington EA-1096: Washington Wildlife Mitigation Projects (Programmatic), Washington SUMMARY This EA evaluates the environmental impacts of the proposal for the U.S. Department of Energy Bonneville Power Administration to fund the portion of the Washington Wildlife Mitigation Agreement pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD July 30, 1996 EA-1096: Finding of No Significant Impact Washington Wildlife Mitigation Projects (Programmatic) July 30, 1996 EA-1096: Final Environmental Assessment Washington Wildlife Mitigation Projects (Programmatic)

149

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checldist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28-10 28-10 U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checldist Project/Activity: New Verde Mine Investigations, Lease Tract C-G-26, Uranium Leasing Program A. Brief Project/Activity Description Energy Fuels Resources Corporation (EFRC), lessee to the U.S. Department of Energy Office of Legacy Management, proposes to evaluate former mine workings associated with the New Verde Mine on Lease Tract C-G-26 in preparation for potential future mine development. This lease tract is on Calamity Mesa, along the southern flank of the Uncompahgre Plateau in southwestern Mesa County. The mine site would be accessed by workers on a former mine access road and on public roads. A bulkhead, approximately 6 feet (ft) high and 9 ft wide, was constructed of concrete blocks in 1996 to seal the

150

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29-10 29-10 U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist Project/Activity: Install monitoring wells at the Slick Rock West, Colorado, Processing Site A. Brief Project/Activity Description The U.S. Department of Energy (DOE) Office of Legacy Management (LM) proposes to abandon groundwater monitoring well 0318 and install three new groundwater monitoring wells at the Slick Rock West, Colorado, Processing Site. The attached map shows the well locations. Existing well 0318 would be replaced with well 0318A. The well would be abandoned because either the screen or casing has broken. Well 0318 has 3 feet (ft) of sand inside the casing and about 1 ft of water above the sand, and would be abandoned according to State of Colorado well

151

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25-10 25-10 U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist Project/Activity: Reclamation Projects on Slick Rock Lease Tract C-SR-II, Uranium Leasing Program A. BriefProject/Activity Description The U.S. Department of Energy (DOE) Office of Legacy Management (LM) proposes various reclamation activities related to abandoned mines and mine features that constitute a public safety concern. Independent contractors associated with the lessee (Cotter Corporation) and under supervision of uranium leasing program (ULP) personnel would complete the work, and all projects would be completed within approximately 3 weeks. C-SR-ll is located in southwestern San Miguel County, Colorado. The total estimated surface disturbance would cover 3 acres.

152

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I.D. # LM 27-10 U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist Project/Activity: Reclamation Projects in Lease Tract C-G-26, Uranium Leasing Program A. Brief Proj ect/ Activity Description The U.S. Department Of Energy (DOE) Office of Legacy Management (LM) proposes to reclaim mining features associated with abandoned mines inherited by LM as a result of realigning lease tract boundaries in 2007. The activities include closing mine portals, filling subsided areas, and closing shafts and vents. Independent contractors associated with Energy Fuels Resources, the leaseholder, would complete all work in an estimated 1 week in 2010. The presence of these features constitute a public and wildlife safety concern. This

153

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

26-10 U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist Project/Activity: Reclamation Projects on Wedding Bell Mountain Lease Tract C-WM-17, Uranium Leasing Program A. BriefProject/Activity Description The U.S. Department of Energy (DOE) Office of Legacy Management (LM) proposes several minor reclamation activities related to abandoned mines and mine features that pose a public safety concern. In 2007, LM inherited abandoned mines as a result of re-aligning lease tract boundaries.1pdependent contractors associated with the lessee (Golden Eagle Uranium) and under the supervision of uranium leasing program personnel would complete the work, and all projects would be completed within approximately 2 days. The Wedding Bell Mountain Lease

154

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checldist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-10 3-10 U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checldist Project/Activity: Install a test cover at Grand Junction, CO, Disposal Site . A. Brief Project/Activity Description The U.S. Department of Energy (DOE) Office of Legacy Management eLM) proposes to install a 70 foot (ft) x 140 ft test cover that duplicates the top 42 inches of the existing cover at the Grand Junction, CO, Disposal Site. The purpose of the test cover is to evaluate methods for renovating low-permeability disposal cell covers and to measure the effects of renovation on soil hydraulic properties and seedbed ecology. The test cover would be constructed on the surface of an existing stockpile of clay soil and would be located approximately 100 ft from an existing access

155

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14-10 U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist Project/Activity: Install demonstration wind turbine at Weldon Spring, MO, Site A. Brief Project/Activity Description The U.S. Depatiment of Energy Office of Legacy Management proposes to install a small (6 to 9 feet [ft] diameter) wind turbine near the Interpretive Center on the Weldon Spring Site. The wind turbine would be pole-mounted with a final height of20 to 30 ft above the ground surface. The turbine would be considered a small demonstration project to show the public practical home use of wind energy, and it would also correlate with a larger permanent renewable energy display within the Interpretivc Center. The wind turbine is expected to produce enough energy to run the

156

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checldist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ll-10 ll-10 U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checldist Project/Activity: Maintenance actions at the Monument Valley, AZ, Site A. Brief Project/Activity Description The U.S. Department of Energy (DOE) Office of Legaey Management needs to remove windblown sand that has built up along the Monument Valley, AZ, Site north fence line, repair eroded areas below the fence, and raise the height of the site perimeter fence to prevent domestic animal intrusion into the site area. The windblown sand has formed a small dune along the nOlth perimeter fence line of the site. The affected fence is 3 feet high and consists of three strands of barbed wire. Windblown weeds accumulate along the fence and trap sand, which over time buries the fence and enables free-

157

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D. # LM-lS-lO D. # LM-lS-lO U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist Project/Activity: Install geotechnical holes at the Lakeview, OR, Disposal Site A. Brief Project/Activity Description The U.S. DepaJiment of Energy (DOE) Office of Legacy Management (LM) proposes to advance six direct-push geotechnical holes into the top of the Lakeview Disposal Cell and two geotechnical holes into the side slopes of the Lakeview Disposal Cell to determine moisture conditions within the cell. The holes would be hydraulically pushed 10 to 55 feet (ft) into the cell using a geoprobe rig. To ensure protection of the 2-ft-thick compacted clay barrier beneath the tailings, hole locations and depths would be limited so as to not extend within 10 ft of the base of the tailings. A plan that

158

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 17, 2010 December 17, 2010 CX-004835: Categorical Exclusion Determination Electric Vehicle Charging Stations City of Mill Creek CX(s) Applied: B5.1 Date: 12/17/2010 Location(s): Mill Creek, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office December 16, 2010 CX-004691: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 12/16/2010 Location(s): Kirkland, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory December 16, 2010 CX-004836: Categorical Exclusion Determination Marine and Hydrokinetic Technology Readiness Advancement Initiative CX(s) Applied: A9, B3.6 Date: 12/16/2010 Location(s): Lynnwood, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

159

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

26, 2010 26, 2010 CX-003272: Categorical Exclusion Determination Washington-City-Everett CX(s) Applied: A1, A9, A11, B1.32, B5.1 Date: 07/26/2010 Location(s): Everett, Washington Office(s): Energy Efficiency and Renewable Energy July 23, 2010 EIS-0119: Amended Record of Decision Decommissioning of Eight Surplus Production Reactors at the Hanford Site, Richland, Washington July 22, 2010 CX-003234: Categorical Exclusion Determination Demolition of Vacant House at Bonneville Power Administration's Ross Complex CX(s) Applied: B1.23 Date: 07/22/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration July 21, 2010 CX-003236: Categorical Exclusion Determination Augspurger Fiber Replacement Project CX(s) Applied: B1.7, B4.7 Date: 07/21/2010 Location(s): Skamania County, Washington

160

Assessing the Thermal Environmental Impacts of an Groundwater Heat Pump in Southeastern Washington State  

SciTech Connect

A thermal analysis of a large-scale (e.g., 1900 gpm), open-loop ground source heat pump (GSHP) installed on the Pacific Northwest National Laboratory (PNNL) campus in southeastern Washington State has been performed using a numerical modeling approach. Water temperature increases at the upgradient extraction wells in the system and at the downgradient Columbia River are potential concerns, especially since heat rejection to the subsurface will occur year-round. Hence, thermal impacts of the open-loop GSHP were investigated to identify operational scenarios that minimized downgradient environmental impacts at the river, and upgradient temperature drift at the production wells. Simulations examined the sensitivity of the system to variations in pumping rates and injected water temperatures, as well as to hydraulic conductivity estimates of the aquifer. Results demonstrated that both downgradient and upgradient thermal impacts were more sensitive to injection flow rates than estimates of hydraulic conductivity. Higher injection rates at lower temperatures resulted in higher temperature increases at the extraction wells but lower increases at the river. Conversely, lower pumping rates and higher injected water temperatures resulted in a smaller temperature increase at the extraction wells, but higher increases at the river. The scenario with lower pumping rates is operationally more efficient, but does increase the likelihood of a thermal plume discharging into the Columbia River. However, this impact would be mitigated by mixing within the hyporheic zone and the Columbia River. The impact under current operational conditions is negligible, but future increases in heat rejection could require a compromise between maximizing operational efficiency and minimizing temperature increases at the shoreline.

Freedman, Vicky L.; Waichler, Scott R.; Mackley, Rob D.; Horner, Jacob A.

2012-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25, 2010 25, 2010 CX-003611: Categorical Exclusion Determination Schultz - Raver Number 3 and 4 500-kilovolt (kV) Transmission Lines Spacer Replacement CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): King County, Washington Office(s): Bonneville Power Administration August 25, 2010 CX-003610: Categorical Exclusion Determination Ross-Lexington Number 1 Access Road Repair Project CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration August 25, 2010 CX-003609: Categorical Exclusion Determination Cushman North Fork Skokomish Powerhouse CX(s) Applied: A9 Date: 08/25/2010 Location(s): Tacoma, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 25, 2010 CX-003614: Categorical Exclusion Determination

162

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 3, 2010 May 3, 2010 CX-002190: Categorical Exclusion Determination Nisqually Indian Tribe of the Nisqually Reservation Energy Efficiency Retrofits of Tribal Center CX(s) Applied: B2.5, B5.1 Date: 05/03/2010 Location(s): Nisqually Reservation, Washington Office(s): Energy Efficiency and Renewable Energy May 3, 2010 CX-002438: Categorical Exclusion Determination Rocky Reach-Maple Valley Number-1 Transmission Line Bridge Replacement Project CX(s) Applied: B1.3 Date: 05/03/2010 Location(s): Kittitas County, Washington Office(s): Bonneville Power Administration April 30, 2010 CX-002137: Categorical Exclusion Determination Farm Power Lynden CX(s) Applied: B5.1 Date: 04/30/2010 Location(s): Lynden, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

163

EA-1958: Future Development in proximity (sic) to the William R. Wiley Environmental Molecular Sciences Laboratory, Pacific Northwest National Laboratory, Richland, Washington  

Energy.gov (U.S. Department of Energy (DOE))

This Environmental Assessment (EA) evaluates U.S. Department of Energy (DOE) activities associated with proposed future development on the South Federal Campus of the DOE Pacific Northwest National Laboratory (PNNL) Site, in Benton County, Washington.

164

Technical and Analytical Support Services to the Office of Environmental Analysis, Office of Environment, Safety and Health. Final report  

SciTech Connect

The primary purpose of this contract was to provide technical analyses, studies, and reviews related to land use/water issues and energy resource development in support of the activities of the Office of Environmental Analysis, Office of Environment, Safety and Health. Tasks under this contract included: Issue Papers. Energetics provided issue papers on a number of specific energy and environmental issue areas. Each issue paper consisted of a systematic review and analysis of major factors (technical, legal, environmental, economic, energy, health and social) that could enter into DOE`s environmental/energy policy decisions; Special Analyses. Energetics conducted special in-depth technical analyses as requested by the Contracting Officer`s Technical Representative (COTR); and Critical Review and Evaluation of Program Reports. Energetics performed critical reviews of a number of technical reports arising from DOE program activities. These documents included issue papers and reports resulting from special technical analyses of specific issues, technologies, or broad areas of concern. Reviews focused on both the technical and programmatic impact of the report. Energetics made recommendations and gave input to assist DOE in determining the environmental impacts of energy policies and projects.

NONE

1995-02-01T23:59:59.000Z

165

Biological and Environmental Research (BER) Homepage | U.S. DOE Office of  

Office of Science (SC) Website

BER Home BER Home Biological and Environmental Research (BER) BER Home About Research Facilities Science Highlights Benefits of BER Funding Opportunities Biological & Environmental Research Advisory Committee (BERAC) News & Resources Contact Information Biological and Environmental Research U.S. Department of Energy SC-23/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3251 F: (301) 903-5051 E: sc.ber@science.doe.gov More Information » BER Accomplishments BSSD / CESD Timeline Take an interactive look at a century of scientific accomplishments in BER's Climate and Environmental Sciences / Biological Systems Science DivisionsRead More BER Interactive Accomplishments Timeline Understanding Complex Biological and Environmental Systems

166

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 25, 1994 February 25, 1994 EA-0915: Final Environmental Assessment Waste Tank Safety Program Hanford Site, Richland, Washington January 1, 1994 EIS-0194: Final Environmental Impact Statement Tenaska Washington II Generation Project, Washington September 16, 1993 EIS-0119: Record of Decision Decommissioning of Eight Surplus Production Reactors at the Hanford Site, Richland, Washington December 1, 1992 EIS-0119: Final Environmental Impact Statement Decommissioning of Eight Surplus Production Reactors at the Hanford Site, Richland, Washington September 1, 1992 EA-0429: Final Environmental Assessment Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington August 10, 1992 EA-0881: Finding of No Significant Impact Tank 241-c-103 Organic Vapor and Liquid Characterization and Supporting

167

Review of the Department of Energy Office of Environmental Management...  

NLE Websites -- All DOE Office Websites (Extended Search)

ANSI American National Standards Institute D&D Decontamination and Decommissioning DOE U.S. Department of Energy HSS Office of Health, Safety and Security NCS Nuclear...

168

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13, 2010 13, 2010 CX-003035: Categorical Exclusion Determination Pacific Northwest Smart Grid Demonstration CX(s) Applied: A1, A9, A11, B1.7, B4.4, B5.1 Date: 07/13/2010 Location(s): Fox Island, Washington Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory July 12, 2010 CX-003628: Categorical Exclusion Determination Kittitas County Conservation Easement Acquisition CX(s) Applied: B1.25 Date: 07/12/2010 Location(s): Kittitas County, Washington Office(s): Bonneville Power Administration July 12, 2010 CX-003447: Categorical Exclusion Determination Bridge and Access Road Maintenance CX(s) Applied: B1.3 Date: 07/12/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration July 12, 2010 CX-003240: Categorical Exclusion Determination

169

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15, 2010 15, 2010 CX-001639: Categorical Exclusion Determination Transportation Demand Management on 164th S/128th SW/20th SE CX(s) Applied: A9, A11, B5.1 Date: 04/15/2010 Location(s): Snohomish County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 15, 2010 CX-001821: Categorical Exclusion Determination SGL Automotive Carbon Limited Liability Company (LLC) CX(s) Applied: B5.1 Date: 04/15/2010 Location(s): Moses Lake, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office March 31, 2010 CX-001386: Categorical Exclusion Determination Dragoon Creek Access to Bonneville Power Administration's Bell-Boundary #3 Transmission Line to Replace Existing Bridge CX(s) Applied: B1.13, B1.3 Date: 03/31/2010 Location(s): Spokane County, Washington

170

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 15, 2011 February 15, 2011 CX-005262: Categorical Exclusion Determination Woodland and 148th Clearwire Wireless Communication Project CX(s) Applied: B1.7, B1.19 Date: 02/15/2011 Location(s): Pierce County, Washington Office(s): Bonneville Power Administration February 11, 2011 CX-005224: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 02/11/2011 Location(s): Bellevue, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory February 10, 2011 CX-005218: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 02/10/2011 Location(s): Renton, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy

171

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 30, 2010 June 30, 2010 CX-003023: Categorical Exclusion Determination Output Power Purchase Agreement with Northwest Energy Supply Cooperative - Barr-Tech, LLC Resource CX(s) Applied: B4.1 Date: 06/30/2010 Location(s): Fishtrap, Washington Office(s): Bonneville Power Administration June 30, 2010 CX-002874: Categorical Exclusion Determination Game Farm Park Energy Efficient Replacement Lighting Project CX(s) Applied: B2.5, B5.1 Date: 06/30/2010 Location(s): Auburn, Washington Office(s): Energy Efficiency and Renewable Energy June 30, 2010 CX-002873: Categorical Exclusion Determination Green House Gas Inventory CX(s) Applied: A9, A11, B5.1 Date: 06/30/2010 Location(s): Auburn, Washington Office(s): Energy Efficiency and Renewable Energy June 24, 2010 CX-002876: Categorical Exclusion Determination

172

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 9, 1995 November 9, 1995 EA-1123: Final Environmental Assessment Transfer of Normal and Low-Enriched Uranium Billets to the United Kingdom, Hanford Site, Richland, Washington October 1, 1995 EIS-0212: Final Environmental Impact Statement Safe Interim Storage of Hanford Tank Wastes, Hanford Site, Richland, Washington October 1, 1995 EIS-0173: DOE Notice of Availability of the Record of Decision Puget Power Northwest Washington Transmission Project October 1, 1995 EIS-0245: Draft Environmental Impact Statement Management of Spent Nuclear Fuel from the K Basins at the Hanford Site, Richland, Washington May 1, 1995 EA-0984: Finding of No Significant Impact Deactivation of the N Reactor Facilities, Richland, Washington May 1, 1995 EA-0984: Final Environmental Assessment Deactivation of the N Reactor Facilities, Richland, Washington

173

EERE: Golden Field Office Public Reading Room - FINAL Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

Sk Sk Skip to main content Menu Energy.gov Office of Energy Efficiency & Renewable Energy Search Search form Search Office of Energy Efficiency & Renewable Energy Office of Energy Efficiency & Renewable Energy Services Services Home Energy Basics States and Local Communities Technical Assistance Energy Analysis Jobs, Education, and Training Publications Funding Efficiency Efficiency Home Buildings Homes Advanced Manufacturing Government Energy Management Renewables Renewables Home Solar Geothermal Wind Water Transportation Transportation Home Vehicles Bioenergy Hydrogen & Fuel Cells About Us About Us Home News & Blog News & Blog Home Bioenergy Buildings Geothermal Government Energy Management Homes Hydrogen & Fuel Cells Advanced Manufacturing Solar Vehicles Water Wind

174

DOE Awards Small Business Contract for Administrative Support to the Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE))

Cincinnati - The Department of Energy (DOE) today awarded a task order to North Wind Solutions, LLC of Idaho Falls, Idaho to provide administrative support to the Office of Environmental Management.

175

Projects at the Western Environmental Technology Office. Quarterly technical progress report, April 1--June 30, 1995  

Science Conference Proceedings (OSTI)

This report contains brief outlines of the multiple projects under the responsibility of the Western Environmental Technology Office in Butte Montana. These projects include biomass remediation, remediation of contaminated soils, mine waste technology, and several other types of remediation.

NONE

1995-08-01T23:59:59.000Z

176

DOE Awards Small Business Contract for Technical Support to the Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE))

Cincinnati - The Department of Energy (DOE) today awarded a task order to North Wind Solutions, LLC of Idaho Falls, Idaho to provide technical support to the Office of Environmental Management.

177

Assessment of Safety Culture at the U.S. Departmen to Energy Office of Environmental Management Headquarters, November 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment of Assessment of Safety Culture at the U.S. Department of Energy Office of Environmental Management Headquarters May 2011 November 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Independent Oversight Assessment of Safety Culture at the U.S. Department of Energy Office of Environmental Management Headquarters Table of Contents 1.0 Introduction........................................................................................................................................... 1 2.0 Scope and Methodology ....................................................................................................................... 2

178

Assessment of Safety Culture at the U.S. Departmen to Energy Office of Environmental Management Headquarters, November 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment of Assessment of Safety Culture at the U.S. Department of Energy Office of Environmental Management Headquarters May 2011 November 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Independent Oversight Assessment of Safety Culture at the U.S. Department of Energy Office of Environmental Management Headquarters Table of Contents 1.0 Introduction........................................................................................................................................... 1 2.0 Scope and Methodology ....................................................................................................................... 2

179

Environmental Assessment Use of Existing Borrow Areas, Hanford Site, Richland, Washington  

SciTech Connect

The U.S. Department of Energy (DOE) operates the Hanford Site near Richland, Washington. The DOE needs to identify and operate onsite locations for a continued supply of raw aggregate materials [approximately 7,600,000 cubic meters (10,000,000 cubic yards) over the next 10 years] for new facility construction, maintenance of existing facilities and transportation corridors, and fill and capping material for remediation and other sites.

N /A

2001-10-10T23:59:59.000Z

180

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 30, 2010 September 30, 2010 CX-004092: Categorical Exclusion Determination Advanced Energy Efficient Building Technologies for High Performance Hospitals CX(s) Applied: A9 Date: 09/30/2010 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory September 30, 2010 CX-004074: Categorical Exclusion Determination Cascade Community Wind Mid Scale Wind Turbines CX(s) Applied: A9, B5.1 Date: 09/30/2010 Location(s): Kittitas County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office September 29, 2010 CX-004145: Categorical Exclusion Determination Advanced Low Energy Enzyme Catalyzed Solvent for Carbon Dioxide Capture CX(s) Applied: A9, B3.6 Date: 09/29/2010 Location(s): Richland, Washington

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 7, 2011 October 7, 2011 CX-006814: Categorical Exclusion Determination Columbia Rural Electric Association (Columbia REA) Dayton Substation Tap Line Project CX(s) Applied: B4.12 Date: 10/07/2011 Location(s): Dayton, Columbia County, Washington Office(s): Bonneville Power Administration September 28, 2011 CX-006957: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project - Seattle Public Utilities CX(s) Applied: B5.1 Date: 09/28/2011 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, Sandia Site Office September 26, 2011 EIS-0421: Record of Decision Big Eddy-Knight Transmission Project Wasco County, Oregon and Klickitat County, Washington September 26, 2011 CX-006843: Categorical Exclusion Determination ER52 Fire Station Warning Signals

182

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 18, 2009 November 18, 2009 CX-000195: Categorical Exclusion Determination Washington County Pierce CX(s) Applied: A9, A11, B5.1 Date: 11/18/2009 Location(s): Pierce County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 12, 2009 CX-000376: Categorical Exclusion Determination Boise White Paper Mill Carbon Capture and Sequestration CX(s) Applied: A1, A9, B3.1, B3.6 Date: 11/12/2009 Location(s): Richland, Washington Office(s): Fossil Energy, National Energy Technology Laboratory November 4, 2009 Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4 cents per kWh - Without New Dams $30.6 million Recovery Act investment by the Department of Energy highlights the additional potential of hydro power November 2, 2009

183

DOE/EIS-0333; Draft NEPA/SEPA Environmental Impact Statement Bonneville Power Administration, Benton County, Washington (03/2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1520 Kelly Place 1520 Kelly Place Walla Walla, Washington 99362 March 26, 2002 In reply refer to: PTS/Walla Walla To: People Interested in the Maiden Wind Farm We would like to hear from you about Bonneville Power Administration (BPA) and Benton County's Draft Environmental Impact Statement (EIS) for the Maiden Wind Farm. If you requested a copy of the Draft EIS or Summary, it is enclosed for your review. Comments will be accepted until May 15, 2002. The Draft EIS describes the proposed project, tells why it may be needed, discusses the environmental and social impacts the project could create, and lists the mitigation measures that would lessen or eliminate those impacts. We greatly appreciate your time in reviewing the document and giving us

184

ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington, D.C. 20585 Washington, D.C. 20585 April 25, 2013 2 Environmental Management Site-Specific Advisory Board - April 25, 2013 Meeting Minutes LIST OF ACRONYMS AB - Advisory Board ANL - Argonne National Laboratory ARP - Accelerator Retrieval Project BNL - Brookhaven National Laboratory BRC - Blue Ribbon Commission CAB - Citizens Advisory Board D&D - Decontamination & Decommissioning DDFO - Deputy Designated Federal Officer DOE - Department of Energy DUF6 - Depleted Uranium Hexafluoride DWPF - Defense Waste Processing Facility EIS - Environmental Impact Statement EM - DOE Office of Environmental Management EM SSAB - DOE Office of Environmental Management Site-Specific Advisory Board EPA - U.S. Environmental Protection Agency FY - Fiscal Year

185

Categorical Exclusion Determinations: Washington, D.C. | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington, D.C. Washington, D.C. Categorical Exclusion Determinations: Washington, D.C. Location Categorical Exclusion Determinations issued for actions in Washington, D.C. DOCUMENTS AVAILABLE FOR DOWNLOAD June 11, 2013 CX-010460: Categorical Exclusion Determination Novel Low Cost Environmentally Friendly Synthetic Approaches toward Core-Shell Structured Micro CX(s) Applied: B3.6 Date: 06/11/2013 Location(s): District of Columbia Offices(s): National Energy Technology Laboratory March 28, 2013 CX-010567: Categorical Exclusion Determination Lawrence Berkeley National Laboratory - Rapid Automated Modeling and Simulation of Existing Buildings for Energy Efficiency CX(s) Applied: B3.6 Date: 02/28/2013 Location(s): California, District of Columbia Offices(s): Advanced Research Projects Agency-Energy

186

DOE - Office of Legacy Management -- Fernald Environmental Management  

Office of Legacy Management (LM)

Fernald Environmental Management Fernald Environmental Management Project - 027 FUSRAP Considered Sites Site: Fernald Environmental Management Project (027) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Fernald Environmental Management Project (FEMP), formerly known as the Feed Materials Production Center, is located about 18 miles northwest of Cincinnati, Ohio. The facility produced uranium metal products between 1953 and 1989 for use in production reactors to make plutonium and tritium at other Department of Energy (DOE) sites in support of United States defense programs. Uranium metal production ended in July 1989 and resources shifted

187

DOE - Office of Legacy Management -- Fernald Environmental Management...  

Office of Legacy Management (LM)

Environmental Management Project (FEMP), formerly known as the Feed Materials Production Center, is located about 18 miles northwest of Cincinnati, Ohio. The facility...

188

Office of Environmental Management's Hanford Site Awards $99M...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Partnering with Minority Serving Institutions Protecting Civil Rights Integrating Environmental Justice Coordinating the Council on Women and Girls Investing in Minority Banks...

189

Memorandum: Revised Guidance for the Office of Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Environmental Management Site Specific Advisory Boards From: Assistant Secretary, Jessie H. Roberson (EM-1) To: SSAB Members (J. Bierer, T. Martin, M. Wilson, P. Claire, J....

190

United States Department of Energy Chicago Field Office Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

ASME American Society of Mechanical Engineers D&D Decontamination and Decommissioning DOE U.S. Department of Energy EM Environmental Restoration and Waste Management FY fiscal...

191

EERE: Golden Field Office Environmental Assessment for the Ohio...  

NLE Websites -- All DOE Office Websites (Extended Search)

Room You are here: Golden Home > Public Reading Room > Environmental Assessment for the Ohio State 4-H Center Documents Download Acrobat Reader. DOEEA 1571 Finding of No...

192

Offices | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Offices Offices Offices All Offices Program Offices Advanced Research Projects Agency - Energy Loan Programs Office Office of Electricity Delivery & Energy Reliability Office of Energy Efficiency & Renewable Energy Office of Environmental Management Office of Fossil Energy Office of Indian Energy Policy and Programs Office of Legacy Management Office of Nuclear Energy Office of Science Staff Offices Office of Congressional and Intergovernmental Affairs Office of Economic Impact and Diversity Office of Energy Policy and Systems Analysis Office of Health, Safety and Security Office of Hearings and Appeals Office of Inspector General Office of Intelligence and Counterintelligence Office of Management Office of NEPA Policy and Compliance Office of Policy and International Affairs

193

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

45 UY 2 9 1987 Mr. Carl Schafer Director of Environmental Policy Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C. 20301 Dear Mr....

194

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

my 2 9 1987 Mr. Carl Schafer Director of Environmental Policy Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C. 20301 Dear Mr....

195

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 9, 2010 September 9, 2010 CX-003832: Categorical Exclusion Determination Issaquah Highlands Zero Energy Affordable Housing CX(s) Applied: A9, B2.2, B2.5, B5.1, B6.3 Date: 09/09/2010 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory September 8, 2010 CX-003908: Categorical Exclusion Determination Fiscal Year 2010 Columbia Basin Fish Accords with Colville Confederated Tribes CX(s) Applied: B1.25 Date: 09/08/2010 Location(s): Okanogan County, Washington Office(s): Bonneville Power Administration September 8, 2010 CX-003789: Categorical Exclusion Determination Grandview-Red Mountain Number 1 Proposed Transmission Line Interconnection CX(s) Applied: B4.6 Date: 09/08/2010 Location(s): Benton County, Washington

196

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States » Washington United States » Washington Washington December 24, 2013 The concrete "core" is removed from Tank C-105 after workers cut a 55-inch hole in the tank dome. Cleanup Progresses at the Office of River Protection RICHLAND, Wash. - EM's Office of River Protection's (ORP) mission continues: to retrieve, treat and dispose of the 56 million gallons of radioactive and chemical waste stored in large, underground tanks. In 2013, ORP maintained steady progress toward the successful completion of its mission. December 24, 2013 Workers sample a well used to monitor groundwater at the Hanford site. EM's Richland Operations Office Celebrates Disposal Achievement in 2013 RICHLAND, Wash. - EM's Richland Operations Office's 2013 accomplishments ranged from cleaning up buildings and waste sites to treating a record

197

Categorical Exclusion Determinations: Office of River Protection-Richland  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14, 2012 14, 2012 CX-009693: Categorical Exclusion Determination CH2MHill Plateau Remediation Company - Site Characterization and Environmental Monitoring, December 2012 to December 2013 CX(s) Applied: B3.1 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 14, 2012 CX-009692: Categorical Exclusion Determination CH2MHill Plateau Remediation Company - Cleanup Actions, December 2012 to December 2013 CX(s) Applied: B6.1 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 14, 2012 CX-009673: Categorical Exclusion Determination Washington River Protection Solutions LLC - Facility Safety and Environmental Improvements CX(s) Applied: B2.5 Date: 12/14/2012 Location(s): Washington

198

The Management of Post-Recovery Act Workforce Transition at Office...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management of Post-Recovery Act Workforce Transition at Office of Environmental Management Sites OAS-RA-12-06 February 2012 Department of Energy Washington, DC 20585 February 22,...

199

Carlsbad Field Office Recognized by New Mexico and DOE for Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recognized by New Mexico and DOE for Recognized by New Mexico and DOE for Environmental Excellence at WIPP Carlsbad Field Office Recognized by New Mexico and DOE for Environmental Excellence at WIPP December 13, 2011 - 12:00pm Addthis Media Contact Deb Gill www.wipp.energy.gov 575-234-7270 CARLSBAD, N.M. - The Department of Energy (DOE) Carlsbad Field Office (CBFO) was selected for top recognition for environmental stewardship and for reducing energy, water and paper usage at the DOE's Waste Isolation Pilot Plant (WIPP). The New Mexico Environment Department (NMED) recently selected CBFO for a Bronze Award under their Green Zia Environmental Leadership Program, which recognized New Mexico businesses or organizations for their commitment towards environmental stewardship by implementing pollution prevention

200

EA-1693: Transmission Services Facility, Clark County, Washington |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Transmission Services Facility, Clark County, Washington 3: Transmission Services Facility, Clark County, Washington EA-1693: Transmission Services Facility, Clark County, Washington Summary DOE will prepare an EA to evaluate the potential environmental impacts from the proposed three-to-five story office building that would be constructed to meet the Leadership in Energy and Environmental Design (LEED) Gold standard in energy efficiency and sustainability, near Bonneville Power Administration's (BPA) existing Dittmer Building. BPA website: http://efw.bpa.gov/environmental_services/Document_Library/TSF_Project/ For more information, contact: Stephanie Breeden Environmental Project Manager Bonneville Power Administration - KEC-4 P.O. Box 3621 Portland, Oregon, 97208-3621 Direct telephone number 503-230-5192 Toll-free telephone number 1-800-282-3713

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Oak Ridge Office of Environmental Management Pursues Vision of Future While  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Environmental Management Pursues Vision of Office of Environmental Management Pursues Vision of Future While Remembering Past Oak Ridge Office of Environmental Management Pursues Vision of Future While Remembering Past December 27, 2012 - 12:00pm Addthis Demolition of K-25, DOE’s largest-ever demolition project, is ongoing. Demolition of K-25, DOE's largest-ever demolition project, is ongoing. This graphic shows the status of activities at the East Tennessee Technology Park as of this month. Various colors note sites where facilities have been demolished, demolition is under way, or structures are ready or being prepared for demolition. It also identifies buildings that will remain there. This graphic shows the status of activities at the East Tennessee Technology Park as of this month. Various colors note sites where

202

Environmental assessment for the relocation and storage of isotopic heat sources, Hanford Site, Richland, Washington  

SciTech Connect

As part of a bilateral agreement between the Federal Minister for Research and Technology of the Federal Republic of Germany (FRG) and the DOE, Pacific Northwest National Laboratory (PNNL) developed processes for the treatment and immobilization of high-level radioactive waste. One element of this bilateral agreement was the production of sealed isotopic heat sources. During the mid-1980s, 30 sealed isotopic heat sources were manufactured. The sources contain a total of approximately 8.3 million curies consisting predominantly of cesium-137 and strontium-90 with trace amounts of transuranic contamination. Currently, the sources are stored in A-Cell of the 324 Building. Intense radiation fields from the sources are causing the cell windows and equipment to deteriorate. Originally, it was not intended to store the isotopic heat sources for this length of time in A-cell. The 34 isotopic heat sources are classified as remote handled transuranic wastes. Thirty-one of the isotopic heat sources are sealed, and seals on the three remaining isotopic heat sources have not been verified. However, a decision has been made to place the remaining three isotopic heat sources in the CASTOR cask(s). The Washington State Department of Health (WDOH) has concurred that isotopic heat sources with verified seals or those placed into CASTOR cask(s) can be considered sealed (no potential to emit radioactive air emissions) and are exempt from WAC Chapter 246-247, Radiation Protection-Air Emissions.

NONE

1997-06-01T23:59:59.000Z

203

Environmental assessment for the resiting, construction, and operation of the Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington  

Science Conference Proceedings (OSTI)

This environmental assessment (EA) presents estimated environmental impacts from the resiting, construction, and operation of the US Department of Energy`s (DOE`s) Environmental and Molecular Sciences Laboratory (EMSL), which is proposed to be constructed and operated on land near the south boundary of the Hanford Site near Richland, Washington. The EMSL, if constructed, would be a modern research facility in which experimental, theoretical, and computational techniques can be focused on environmental restoration problems, such as the chemical and transport behavior of complex mixtures of contaminants in the environment. The EMSL design includes approximately 18,500 square meters (200,000 square feet) of floor space on a 12-hectare (30-acre) site. The proposed new site is located within the city limits of Richland in north Richland, at the south end of DOE`s 300 Area, on land to be deeded to the US by the Battelle Memorial Institute. Approximately 200 persons are expected to be employed in the EMSL and approximately 60 visiting scientists may be working in the EMSL at any given time. State-of-the-art equipment is expected to be installed and used in the EMSL. Small amounts of hazardous substances (chemicals and radionuclides) are expected to be used in experimental work in the EMSL.

Not Available

1994-07-01T23:59:59.000Z

204

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2011 9, 2011 Department of Energy Announces $39 Million to Strengthen University-Led Nuclear Energy Research and Development 51 Projects Aim to Cut Carbon Pollution, Create Clean Energy Jobs and Strengthen America's Nuclear Energy Industry August 9, 2011 CX-006474: Categorical Exclusion Determination Biodiesel Crusher and Dryer Facility Upgrades CX(s) Applied: B5.1 Date: 08/09/2011 Location(s): Snohomish County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 8, 2011 CX-006463: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 08/08/2011 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 8, 2011

205

Environmental Assessment for the Transfer of 1100 AREA, Southern Rail Connection and Rolling Stock, Hanford Site, Richland, Washington  

SciTech Connect

This environmental assessment (EA) has been prepared to assess potential environmental impacts associated with the U.S. Department of Energy's proposed action: the transfer of the 1100 Area, southern rail connection and rolling stock to a non-federal entity. Impact information contained herein will be used by the U.S. Department of Energy, Richland Operations Office Manager, to determine if the proposed action is a major federal action significantly affecting the quality of the human environment. If the proposed action is determined to be major and significant, an environmental impact statement will be prepared. If the proposed action is determined not to be major and significant, a Finding of No Significant Impact (FONSI) will be issued and the action can proceed. Criteria used to evaluate significance can be found in Title 40, Code of Federal Regulations (CFR) 1508.27. This EA was prepared in compliance with the ''National Environmental Policy Act'' (NEPA) of 1969, as amended, the Council on Environmental Quality (CEQ) Regulations for Implementing the Procedural Provisions of NEPA (40 CFR 1500-1508), and the U.S. Department of Energy Implementing Procedures for NEPA (10 CFR 1021). The following is a description of each section of the EA. (1) Purpose and Need for Action. This provides a brief statement concerning the problem or opportunity the U.S. Department of Energy is addressing with the proposed action. As necessary, background information is provided. (2) Description of the Proposed Action. A description with sufficient detail to identify potential environmental impacts is provided. (3) Alternatives to the Proposed Action. Reasonable alternative actions, which would address the Purpose and Need, are described. A no action alternative, as required by 10 CFR 1021, also is described. (4) Affected Environment. This provides a brief description of the locale in which the proposed action takes place, and which may be environmentally impacted. (5) Environmental Impacts. The range of environmental impacts, beneficial and adverse, are described for the proposed action. Impacts of alternatives briefly are discussed. (6) Permits and Regulatory Requirements. A brief description of permits and regulatory requirements for the proposed action is provided. (7) Organizations Consulted. Any outside agencies, groups, or individuals contacted as part of environmental assessment documentation preparation are listed. (8) References. Documents used to provide information or data are listed. The appendices contain additional information necessary to support an understanding of the proposed action, alternatives, and potential impacts is provided. Comments resulting from review of the environmental assessment by states and tribes or other stakeholders and the response to those comments will be included in the appendices.

N /A

1998-08-01T23:59:59.000Z

206

Remedial actions at the former Vitro Rare Metals plant site, Canonsburg, Washington County, Pennsylvania. Final Environmental Impact Statement. Volume I  

SciTech Connect

The environmental impacts associated with remedial actions in connection with residual radioactive materials remaining at the inactive uranium processing site located in Canonsburg, Washington County, Pennsylvania are evaluated. The Canonsburg site is an 18.5-acre property that was formerly owned by the Vitro Rare Metals Company. The expanded Canonsburg site would be 30-acre property that would include the Canonsburg site (the former Vitro Rare Metals plant), seven adjacent private houses, and the former Georges Pottery property. During the period 1942 through 1957 the Vitro Manufacturing Company and its successor, the Vitro Corporation of America, processed onsite residues and ores, and government-owned ores, concentrates, and scraps to extract uranium and other rare metals. The Canonsburg site is now the Canon Industrial Park. In addition to storing the residual radioactive materials of this process at the Canonsburg site, about 12,000 tons of radioactively contaminated materials were transferred to a railroad landfill in Burrell Township, Indiana County, Pennsylvania. This Canonsburg FEIS evaluates five alternatives for removing the potential public health hazard associated with the radioactively contaminated materials. In addition to no action, these alternatives involve various combinations of stabilization of the radioactively contaminated materials in place or decontamination of the Canonsburg and Burrell sites by removing the radioactively contaminated materials to another location. In addition to the two sites mentioned, a third site located in Hanover Township, Washington County, Pennsylvania has been considered as a disposal site to which the radioactively contaminated materials presently located at either of the other two sites might be moved.

Not Available

1983-07-01T23:59:59.000Z

207

United States Office of Air and Radiation EPA 402-R-04-002C Environmental Protection Agency July 2004  

E-Print Network (OSTI)

United States Office of Air and Radiation EPA 402-R-04-002C Environmental Protection Agency July Interagency Agreement No. DW89937220-01-7 Project Officer Ronald G. Wilhelm Office of Radiation and Indoor Air result in significant errors when used to predict the impacts of contaminant migration or site

208

Office of Environmental Health and Safety The University of Texas at Austin  

E-Print Network (OSTI)

Office of Environmental Health and Safety The University of Texas at Austin Service Building, Suite 202 Austin, Texas 78712 (512) 471-3511; Fax: (512) 471-6918 INFO SHEET Fluorescent Light Bulb Disposal material and must be collected intact for proper disposal or recycling. The University of Texas at Austin

209

Chemical Disposal The Office of Environmental Health & Safety operates a Chemical Waste Disposal Program  

E-Print Network (OSTI)

Chemical Disposal Dec, 2011 Chemicals: The Office of Environmental Health & Safety operates a Chemical Waste Disposal Program where all University chemical waste is picked up and sent out for proper disposal. (There are some chemicals that they will not take because of their extreme hazards

Machel, Hans

210

ENVIRONMENTAL STANDARD REVIEW PLAN OFFICE OF NUCLEAR REACTOR REGULATION  

E-Print Network (OSTI)

This environmental standard review plan (ESRP) directs the staffs identification and evaluation of impacts to terrestrial ecosystems induced by the operation of heat dissipation systems, especially cooling towers and cooling ponds. The scope of the review directed by this plan will be limited to consideration of the operational aspects of heat dissipation systems in sufficient detail to form a basis for assessing potential operational impacts. Review Interfaces The reviewer for this ESRP should obtain input from or provide input to reviewers for the following ESRPs, as indicated: ` ESRP 2.4.1. Obtain descriptive material on the terrestrial ecology of the site and vicinity to support the analyses made in ESRP 5.3.3.2. ` ESRP 3.4.2. Obtain specific information about the cooling system necessary to assess impacts to the terrestrial environment. ` ESRP 5.3.3.1. Obtain information about heat dissipation to the atmosphere necessary to determine impacts to the terrestrial environment.

unknown authors

1999-01-01T23:59:59.000Z

211

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 14, 2012 December 14, 2012 CX-009689: Categorical Exclusion Determination Washington River Protection Solutions LLC - Disconnection of Utilities CX(s) Applied: B1.27 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 14, 2012 CX-009672: Categorical Exclusion Determination Washington River Protection Solutions LLC - Relocation of Buildings CX(s) Applied: B1.22 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 14, 2012 CX-009671: Categorical Exclusion Determination Washington River Protection Solutions LLC - Demolition and Disposal of Buildings CX(s) Applied: B1.23 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 14, 2012

212

Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington  

SciTech Connect

This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planning process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.

N /A

1999-10-01T23:59:59.000Z

213

EA-1488: Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

728D 728D Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington U.S. Department of Energy Richland Operations Office Richland, Washington 99352 Approved for Public Release; Further Disseminat ion Uillimited June 2011 DOE/EA-1728D June 2011 1 2 3 4 5 6 This page intentionally left blank. 7 8 U.S. Department of Energy DOE/EA-1728D Draft Environmental Assessment iii June 2011 CONTENTS 1 2 1.0 INTRODUCTION ........................................................................................................................... 1 3

214

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 10, 2009 December 10, 2009 CX-000347: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: A1, A9, B5.1 Date: 12/10/2009 Location(s): Snohomish County, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory December 10, 2009 CX-000346: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: A1, A9 Date: 12/10/2009 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory December 7, 2009 CX-000457: Categorical Exclusion Determination Focused Site Characterization for Carbon Dioxide Storage Along a Mount Simon Sandstone Fairway in the Michigan Basin CX(s) Applied: A1, A9

215

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11, 2011 11, 2011 EIS-0422: Record of Decision Bonneville Power Administration's Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project March 11, 2011 CX-005421: Categorical Exclusion Determination Ohop Underbuild Project CX(s) Applied: B4.6, B4.12 Date: 03/11/2011 Location(s): Pierce County, Washington Office(s): Bonneville Power Administration March 7, 2011 CX-005417: Categorical Exclusion Determination Beaver Creek Property CX(s) Applied: B1.25 Date: 03/07/2011 Location(s): Okanogan County, Washington Office(s): Bonneville Power Administration March 4, 2011 Latest 200 Area Demolition Offers Snapshot of Hanford Cleanup Progress: Recovery Act Funding Allows Demolition of Power Houses Ahead of Schedule RICHLAND, WASH. - Today's safe and successful explosive demolition at

216

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 15, 2010 June 15, 2010 CX-003090: Categorical Exclusion Determination Perform Routine Access Road Maintenance within the McNary-Ross Number 1 Transmission Line Corridor CX(s) Applied: B1.3 Date: 06/15/2010 Location(s): Klickitat County, Washington Office(s): Bonneville Power Administration June 11, 2010 More than $60 Million in Recovery Act Funding to Expand Local Energy Efficiency Efforts in 20 Communities Competitive block grants to support jobs, save money and increase energy independence June 10, 2010 CX-002767: Categorical Exclusion Determination Granite Mountain 3G Radio Station Project CX(s) Applied: B1.19 Date: 06/10/2010 Location(s): Stevens County, Washington Office(s): Bonneville Power Administration June 9, 2010 Clark County Develops On-the-Job Weatherization Training Program

217

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 17, 2009 July 17, 2009 EIS-0424: Notice of Intent to Prepare an Environmental Impact Statement Klickitat Hatchery Program, Klickitat and Yakima Counties, WA July 1, 2009 EA-1660: Final Environmental Assessment Combined Community Communications Facility and Infrastructure Cleanup on the Fitzner/Eberhardt Arid Lands Ecology Reserve, Hanford Site, Richland, Washington April 21, 2009 EIS-0419: Notice of Intent to Prepare an Environmental Impact Statement Whistling Ridge Energy Project in Skamania County, Washington. March 12, 2009 State Energy Program Assurances - Washington Governor Gregoire Letter from Washington Governor Gregoire providing Secretary Chu with the assurances needed so that Recovery Act funds can be made available. These assurances are required by Section 410 of the American Recovery and

218

Final Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement Richland, Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HSW HSW EIS January 2004 1.6 Figure 1.2. States with Radioactive Waste Disposal Activities Final HSW EIS January 2004 1.12 Figure 1.3. Relationship of the HSW EIS to Other Hanford Cleanup Operations, Material Management Activities, and Key Environmental Reviews 2.17 Final HSW EIS January 2004 Figure 2.6. Waste Receiving and Processing Facility Figure 2.7. X-Ray Image of Transuranic Waste Drum Contents M0212-0286.11 HSW EIS 12-10-02 M0212-0286.12 HSW EIS 12-10-02 2.17 Final HSW EIS January 2004 Figure 2.6. Waste Receiving and Processing Facility Figure 2.7. X-Ray Image of Transuranic Waste Drum Contents M0212-0286.11 HSW EIS 12-10-02 M0212-0286.12 HSW EIS 12-10-02 Final HSW EIS January 2004 2.34 Figure 2.18. Typical Liner System Final HSW EIS January 2004 2.36

219

Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2  

Science Conference Proceedings (OSTI)

This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

NONE

1997-11-10T23:59:59.000Z

220

BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.  

SciTech Connect

Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

United States. Bonneville Power Administration.

1995-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

The U.S. Department of Energy Office of Indian Energy Policy and Programs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington, D.C., Roundtable Summary Washington, D.C., Roundtable Summary March 30, 2011 Prepared by: The Udall Foundation's U.S. Institute for Environmental Conflict Resolution DOE Tribal Roundtable on Tribal Energy Washington, DC Mach 30, 2011 WASHINGTON, D.C. EXECUTIVE SUMMARY The Washington, D.C. Roundtable on Tribal Energy Policy and Priorities convened at 1:30 PM on March 30, 2011 at the Dirksen Senate Building. The meeting was hosted by the Department of Energy (DOE) Office of Indian Energy Policy and Programs (Office of Indian Energy). Tracey LeBeau, Director of the Office of Indian Energy, and Pilar Thomas, Deputy Director-Policy, Office of Indian Energy, represented DOE. Twenty-six participants from six different tribes, various

222

Washington Closure Hanford, LLC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 19,2010 August 19,2010 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Neil Brosee President Washington Closure Hanford, LLC 2620 Fermi Avenue Richland, Washington 99354 WEA-201 0-02 Dear Mr. Brosee: This letter refers to the Office of Health, Safety and Security's Office of Enforcement investigation into the facts and circumstances surrounding the employee fall that occurred at the Hanford High Bay Testing Facility (336 Building) on July 1, 2009. The worker sustained serious injury to his back and broke bones in both legs. Based on an evaluation of the evidence in this matter, the U.S. Department of Energy (DOE) has concluded that violations of 10 C.F.R. Part 851, Worker Safety and Health Program, by Washington Closure Hanford, LLC (WCH) occurred. Accordingly, DOE is issuing the enclosed Preliminary Notice of

223

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 26, 2011 July 26, 2011 Hanford Reaches Recovery Act Goal for Waste Cleanup Ahead of Schedule - Workers Shipped 1,800 Cubic Meters for Treatment and Disposal RICHLAND, Wash. - Today, the Department of Energy Hanford Site announced it reached a cleanup goal more than two months ahead of schedule at the Hanford Site in southeast Washington State. July 25, 2011 CX-006290: Categorical Exclusion Determination Cardwell-Cowlitz 2011 Wood Pole Replacements CX(s) Applied: B1.3 Date: 07/25/2011 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration July 21, 2011 CX-006304: Categorical Exclusion Determination Grand Coulee-Bell #3/Grand Coulee-Westside #1 Insulator Replacement and Access Road Maintenance CX(s) Applied: B1.3 Date: 07/21/2011 Location(s): Grant County, Washington

224

2012 Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18, 2013 18, 2013 MEMORANDUM FOR KAREN L. BOARDM AN CHAIRP ERSON rROM: SU BJ ECT: REFERENCE: FEDE RAL TECHN ICA L CAPABILITIES PANEL MARK WI IITNEY It J I MAN AG ER VV"-c.--'\<.- OAK RIDGE OFFICE or ENV IRONMENT/\L M~ OAK RIDG E OFFICE OF ENVIRONMENT/\ L M/\NAGEMENT ANNUAL WORKFORCE ANAL YSJS AND STAFFING REPORT Memorandum from Karen L. Boardman to Distribution, Annual Workfhrce Analysis and Stqfftng Plan Report f(Jr Calendar Year 20 12, dated October 24, 20 12 As requested, attached is the Oak Ridge Office of Environmental Manage ment (OREM) Calendar Year 2012 annual workforce anal ys is and staffing plan th at identifi es the technica l capabil iti es and pos itions ORe:M needs to ensure safe operations of OREM assigned nuc lear faci liti es. This report is submitted for incorporation into the Federa

225

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21, 2011 21, 2011 CX-007750: Categorical Exclusion Determination Highlands Trail in the Longview-Cowlitz Number 1 Transmission Line Right-of-Way CX(s) Applied: B4.9 Date: 12/21/2011 Location(s): Washington Offices(s): Bonneville Power Administration December 16, 2011 Cows like these in Skagit County, Washington, supply the biodigester developed by Kevin Maas of Farm Power up to 70,000 gallons of manure per day. The newest Farm Power facility in Washington generates enough electricity to power 500 homes. Photo courtesy of sea_turtle. Farming Out Heat and Electricity through Biopower The newest biodigester at the Farm Power facility in Washington generates electricity from biogas created from bacteria's anaerobic digestion of cow

226

Office of the Chief Financial Officer Annual Report 2010  

E-Print Network (OSTI)

Environmental Management Assistant Secretary for Fossil Energy OfficeEnvironmental Management Assistant Secretary for Fossil Energy OfficeOffice Public Affairs Human Resources Environmental Health & Safety Facilities Office of the Chief Financial Officer Information Technology Project Management

Fernandez, Jeffrey

2011-01-01T23:59:59.000Z

227

UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL MANAGEMENT WASTE PROCESSING ANNUAL TECHNOLOGY DEVELOPMENT REPORT 2008  

SciTech Connect

The Office of Waste Processing identifies and reduces engineering and technical risks and uncertainties of the waste processing programs and projects of the Department of Energy's Environmental Management (EM) mission through the timely development of solutions to technical issues. The risks, and actions taken to mitigate those risks, are determined through technology readiness assessments, program reviews, technology information exchanges, external technical reviews, technical assistance, and targeted technology development and deployment. The Office of Waste Processing works with other DOE Headquarters offices and project and field organizations to proactively evaluate technical needs, identify multi-site solutions, and improve the technology and engineering associated with project and contract management. Participants in this program are empowered with the authority, resources, and training to implement their defined priorities, roles, and responsibilities. The Office of Waste Processing Multi-Year Program Plan (MYPP) supports the goals and objectives of the U.S. Department of Energy (DOE) - Office of Environmental Management Engineering and Technology Roadmap by providing direction for technology enhancement, development, and demonstration that will lead to a reduction of technical risks and uncertainties in EM waste processing activities. The MYPP summarizes the program areas and the scope of activities within each program area proposed for the next five years to improve safety and reduce costs and environmental impacts associated with waste processing; authorized budget levels will impact how much of the scope of activities can be executed, on a year-to-year basis. Waste Processing Program activities within the Roadmap and the MYPP are described in these seven program areas: (1) Improved Waste Storage Technology; (2) Reliable and Efficient Waste Retrieval Technologies; (3) Enhanced Tank Closure Processes; (4) Next-Generation Pretreatment Solutions; (5) Enhanced Stabilization Technologies; (6) Spent Nuclear Fuel; and (7) Challenging Materials. This report provides updates on 35 technology development tasks conducted during calendar year 2008 in the Roadmap and MYPP program areas.

Bush, S.

2009-11-05T23:59:59.000Z

228

UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL MANAGEMENT INTERNATIONAL PROGRAM ANNUAL REPORT FOR 2007  

SciTech Connect

The DOE-EM Office of Engineering and Technology is responsible for implementing EM's international cooperative program. The Office of Engineering and Technology's international efforts are aimed at supporting EM's mission of risk reduction and accelerated cleanup of the environmental legacy of the nation's nuclear weapons program and government-sponsored nuclear energy research. To do this, EM pursues collaborations with government organizations, educational institutions, and private industry to identify and develop technologies that can address the site cleanup needs of DOE. The Office of Engineering and Technology has developed a Technology Roadmap and a Multi-year Program Plan to identify technology needs and identify areas for focused research and development to support DOE-EM's environmental cleanup and waste management objectives. The international cooperative program is an important element of the technology development roadmap, leveraging of world-wide expertise in the advancement and deployment of remediation and treatment technologies. Introductory briefings aimed at furthering familiarity with the DOE-EM mission, and the vital role that technology development plays within it, were presented at two international meetings. The Office of Engineering and Technology currently works with the Khlopin Radium Institute (KRI) and SIA Radon Institute in Russia, the International Radioecology Laboratory (IRL) in Ukraine and the Nuclear Engineering and Technology Institute (NETEC) in South Korea through cooperative bilateral arrangements to support EM's accelerated cleanup and closure mission.

Marra, J

2008-08-26T23:59:59.000Z

229

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 8, 2000 March 8, 2000 EIS-0169-SA-03: Supplement Analysis Yakima Fisheries Project-Use of Washington Department of Fish and Wildlife's Yakima Hatchery and Acclimation and Research Activities, Yakima, Yakima County, Washington, Easton, Kittitas County, Washington September 15, 1999 EIS-0310: Notice of Intent to Prepare a Programmatic Environmental Impact Statement Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States, Including the Role of the Fast Flux Test Facility September 1, 1999 EIS-0222: Final Environmental Impact Statement Hanford Comprehensive Land-Use Plan, Hanford Site, Richland, Washington August 16, 1999 EIS-0169-SA-02: Supplement Analysis Yakima Fisheries Project-Natural Spawning Channels, Increased On-site

230

Hanford Site, Richland, Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for the Environmental for the Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington September 1992 U.S. Department of Energy Richland, Washington 99352 Contents 1 . 0 Summary . . 2.0 Purpose of and Need for the Proposed Action . . . . . . 3.0 Proposed Action and Alternatives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.1 Proposed Action 3.2 Onsite Alternatives . . . . . . . . . . 3.3 Offsite Alternatives . . . . . . . . . 3.4 No Action Alternative ~ ~ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.0 Affected Environment . . . . . . . . . . . 5.0 Environmental Impacts . . . . . . . . . . . 5.1 Construction Impacts 5.1.1 Atmospheric Impacts . . . . . . . . . . . . . . . . . . . . . . . . . 5.1.2 Terrestrial Impacts . 5.1.3 Impacts on CERCLA Remedial Actions . 5.1.4 Construction Accidents .

231

News From the D.C. Office: E x p a n s i o n  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Aerial view of Washington D.C. 3 Aerial view of Washington D.C. News From the D.C. Office E x p a n s i o n With a growing amount of project support work and increasing contacts with our Washington-based clients, the Environmental Energy Technologies Division (EETD) Washington Project Office is preparing for an expansion this spring. Two years after the office opened, we are making plans to more than double our present space and add a second meeting room, as well as additional demonstrations of efficient lighting, daylighting, and office technologies. The expanded space will be located either on a different floor of our current building at 1250 Maryland Ave. SW or in another building equally close to DOE headquarters. The Project office was established in Spring 1993 to enhance the Division's

232

Department of Energy EPA\\OAR\\Office of Radiation and Indoor Air U. S. Environmental Protection Agency  

E-Print Network (OSTI)

Agency Ariel Rios Building, 6601 J 1200 Pennsylvania Ave., N.W. Washington, DC 20460 Subject: Hanford Environmental Protection Agency (EPA) staff asked some additional questions concerning the Hanford Tank and K (DOE) staff, EPA staff and Hanford site personnel on April 13, 2005. Three questions remain

233

PIEDMONT ENVIRONMENTAL COUNCIL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PIEDMONT ENVIRONMENTAL COUNCIL PIEDMONT ENVIRONMENTAL COUNCIL October 30, 2013 Julie A. Smith and Christopher Lawrence Office of Electricity Delivery and Energy Reliability Mail Code: OE-20 U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 VIA electronic mail: juliea.smith@hq.doe.gov christopher.lawrence@hq.doe.gov Dear Ms. Smith and Mr. Lawrence: The Piedmont Environmental Council (PEC) was founded in 1972 to promote and protect the Virginia

234

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 26, 1997 February 26, 1997 EIS-0189: Record of Decision Tank Waste Remediation System, Hanford Site, Richland, WA December 1, 1996 EA-1111: Final Environmental Assessment K Pool Fish Rearing, Hanford Site, Richland, Washington October 21, 1996 EA-1177: Final Environmental Assessment Salvage/Demolition of 200 West Area, 200 East Area, and 300 Area Steam Plants August 1, 1996 EIS-0189: Final Environmental Impact Statement Tank Waste Remediation System, Hanford Site, Richland, Washington May 1, 1996 EIS-0244: Final Environmental Impact Statement Plutonium Finishing Plant Stabilization April 1, 1996 EIS-0259: Final Environmental Impact Statement Disposal of Decommissioned, Defueled Cruiser, Ohio Class, Los Angeles and Class Naval Reactor Plants April 1, 1996 EIS-0259: Final Environmental Impact Statement

235

EA-1111: K Pool Fish Rearing, Hanford Site, Richland, Washington...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: K Pool Fish Rearing, Hanford Site, Richland, Washington EA-1111: K Pool Fish Rearing, Hanford Site, Richland, Washington SUMMARY This EA evaluates the environmental impacts of...

236

Washington: Washington's Clean Energy Resources and Economy (Brochure)  

SciTech Connect

This document highlights the Office of Energy Efficiency and Renewable Energy's investments and impacts in the state of Washington.

2013-03-01T23:59:59.000Z

237

Indoor environmental quality and ventilation in U.S. office buildings: A view of current issues  

Science Conference Proceedings (OSTI)

Much of the current focus on indoor environmental quality and ventilation in US office buildings is a response to sick building syndrome and occupant complaints about building-related health symptoms, poor indoor air quality, and thermal discomfort. The authors know that serious ``sick-building`` problems occur in a significant number of US office buildings and that a significant proportion of the occupants in many normal (non-sick) buildings report building-related health symptoms. Concerns about the health effects of environmental tobacco smoke have also focused attention on the indoor environment. The major responses of industry and governments, underway at the present time, are to restrict smoking in offices, to attempt to reduce the emissions of indoor pollutants, and to improve the operation of heating, ventilating and air conditioning (HVAC) systems. Better air filtration, improved HVAC commissioning and maintenance, and increased provisions for individual control of HVAC are some of the improvements in HVAC that are currently being, evaluated. In the future, the potential for improved productivity and reduced airborne transmission of infectious disease may become the major driving force for improved indoor environments.

Fisk, W.J.

1994-11-01T23:59:59.000Z

238

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 26, 2010 July 26, 2010 CX-003272: Categorical Exclusion Determination Washington-City-Everett CX(s) Applied: A1, A9, A11, B1.32, B5.1 Date: 07/26/2010 Location(s): Everett, Washington Office(s): Energy Efficiency and Renewable Energy July 26, 2010 CX-003170: Categorical Exclusion Determination Innovative Phase Change Thermal Energy Storage Solution for Baseload Power CX(s) Applied: B3.6 Date: 07/26/2010 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 22, 2010 CX-003234: Categorical Exclusion Determination Demolition of Vacant House at Bonneville Power Administration's Ross Complex CX(s) Applied: B1.23 Date: 07/22/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration July 21, 2010 CX-003236: Categorical Exclusion Determination

239

Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary  

SciTech Connect

This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

Not Available

1991-09-01T23:59:59.000Z

240

Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary  

SciTech Connect

This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

1991-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 26, 2010 May 26, 2010 CX-002564: Categorical Exclusion Determination FPE Renewables, LLC CX(s) Applied: B5.1 Date: 05/26/2010 Location(s): Lynden, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 26, 2010 CX-002557: Categorical Exclusion Determination G.R. Silicate CX(s) Applied: B5.1 Date: 05/26/2010 Location(s): Hoquiam, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 21, 2010 CX-002567: Categorical Exclusion Determination Harold LeMay Enterprises, Inc. CX(s) Applied: B5.1 Date: 05/21/2010 Location(s): Pierce County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 21, 2010 CX-002563: Categorical Exclusion Determination Clark Public Utilities CX(s) Applied: B5.1

242

Categorical Exclusion Determinations: Environmental Management | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 4, 2011 May 4, 2011 CX-005761: Categorical Exclusion Determination 707-C Storm Drain Repairs CX(s) Applied: B1.3 Date: 05/04/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 28, 2011 CX-005765: Categorical Exclusion Determination Feed Pump Flush Water Connection/Lifting Bail Interference (General - F/H Tank Farms) CX(s) Applied: B1.3 Date: 04/28/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 28, 2011 CX-005892: Categorical Exclusion Determination Columbia River Inter-Tidal Fish Commission Use of White Bluffs Boat Launch and Hanford Town Boat Ramp for Salmon Tagging CX(s) Applied: B3.8 Date: 04/28/2011 Location(s): Richland, Washington Office(s): Environmental Management, Office of River Protection-Richland

243

Grand Junction Projects Office site environmental report for calendar year 1992  

SciTech Connect

This report presents information pertaining to environmental activities conducted during calendar year 1992 at the US Department of Energy Grand Junction Projects Office (DOE-GJPO) facility in Colorado. Environmental activities conducted at the GJPO facility during 1992 included those associated with environmental compliance, site remediation, off-site dose modeling, and radiological and nonradiological monitoring. Four phases of the on-site Grand Junction Projects Office Remedial Action Project were completed in 1992. Remediation activities, which included the removal of 161,589 tons of uranium-mill-tailings-contaminated material from the facility, were conducted in compliance with all applicable permits. Off-site dose modeling for the GJPO was conducted to determine compliance with current National Emission Standards for Hazardous Air Pollutants, Subpart H, and applicable DOE Orders (5400.1 and 5400.5). The total off-site EDE to the public from all sources of radiation emanating from the facility (radon, air particulates, gamma) was calculated as 9 mrem/yr, which is well below the DOE dose limit of 100 mrem/yr above background. The radiological and nonradiological monitoring program at the GJPO facility included monitoring of activities that generate potentially hazardous or toxic wastes and monitoring of ambient air, surface water, and ground water.

Not Available

1993-05-01T23:59:59.000Z

244

Review of the Department of Energy Office of Environmental Management Assessment of the Portsmouth/Paducah Project Office Oversight of the Portsmouth Gaseous Diffusion Plant Criticality Safety Program, May 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Department of Energy Office of Environmental Management Assessment of the Portsmouth/Paducah Project Office Oversight of the Portsmouth Gaseous Diffusion Plant Criticality Safety Program May 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 2

245

Washington - U.S. Energy Information Administration (EIA) - U.S ...  

U.S. Energy Information Administration (EIA)

Washington State Energy Office; ... EIA - 1000 Independence Avenue, SW, Washington, DC 20585 About EIA Press Room Careers Feedback Contact Us. Sources & Uses Petroleum

246

Programs director`s report for the Office of Health and Environmental Research  

SciTech Connect

Since its establishment, the Department of Energy`s Office of Health and Environmental Research (OHER) has had responsibility for conducting biological research to develop the knowledge needed to identify, understand, and anticipate the long-term health consequences of energy use and development, including the potential health impacts of radiation. The Health Effects Research Program has established the basis for understanding the health consequences of radiation for humans, developed radiation dosimetry methodology, characterized and evaluated the health impacts of fossil fuels, and developed and conducted research to determine the health impacts of inhaled toxicants. The results of this research have provided input for setting genetic standards for radiation and chemical exposure.

NONE

1996-08-01T23:59:59.000Z

247

EA-1055; Environmental Assessment and (FONSI) for The Proposed Center for Advanced Industrial Processes Washington State University College of Engineering and Architecture  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

55; Environmental Assessment and (FONSI) for The Proposed 55; Environmental Assessment and (FONSI) for The Proposed Center for Advanced Industrial Processes Washington State University College of Engineering and Architecture Table of Contents ABBREVIATIONS AND ACRONYMS 1. DOCUMENT SUMMARY 2. PURPOSE AND NEED FOR AGENCY ACTION 3. DESCRIPTION OF ALTERNATIVES INCLUDING THE PROPOSED ACTION 3.1 Description of the Proposed Action 3.2 Project Description 3.2.1 Construction Activities 3.2.2 Operation Activities 3.3 No Action Alternative 4. THE AFFECTED ENVIRONMENT 4.1 Site Description 4.2 Air Quality 4.3 Surface/Ground Water Quality 4.4 Soil 4.5 Sensitive Resources 5. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION 5.1 Construction Impacts 5.1.1 Sensitive Resources 5.1.2 Erosion/Run-Off 5.1.3 Demolition/Construction Waste Disposal 5.1.3.1 Conventional Wastes

248

DOE Nevada Operations Office Environmental Protection Implementation Plan, November 9, 1993--November 9, 1994  

Science Conference Proceedings (OSTI)

DOE Order 5400.1, ``General Environmental Protection Program,`` established environmental protection program requirements, authorities, and responsibilities to assure that the Department of Energy (DOE) operations are in compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter III of DOE Order 5400.1 required that each field organization prepare a plan for implementing the requirements of this order by no later than November 9, 1989, and update the plan annually. Therefore, the Department of Energy/Nevada Operations Office (DOE/NV) has prepared this fourth annual update of its Environmental Protection Implementation Plan (EPIP). The Order and corresponding guidances also require estimated budgetary resources necessary for implementation of the Order be identified in the Environmental Protection Implementation Plan. To satisfy this requirement, the estimated costs to effectuate necessary changes in existing programs or processes and to institute new programs or processes for compliance with the Order are provided in the following sections of this plan. The DOE/NV Assistant Manager for Environment, Safety, Security, & Health (AMESSH), in consultation with other organizations responsible for line management of plan implementation, is responsible for annual plan revisions.

Elle, D.R. [USDOE Nevada Operations Office, Las Vegas, NV (United States); Townsend, Y.E. [ed.; Latham, A.R.; Black, S.C. [Reynolds Electrical and Engineering Co., Inc., Las Vegas, NV (United States)

1993-11-01T23:59:59.000Z

249

SunShot Initiative: Visiting the SunShot Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Visiting the SunShot Office Visiting the SunShot Office Photo of the exterior front of 950 L'Enfant Plaza. The entryway is lined with a row of trees and lamp posts. In the foreground is an open space that is bricked and cemented. The DOE Solar Office is located at 950 L'Enfant Plaza in Washington, D.C. Located near the U.S. Department of Energy headquarters, the SunShot Initiative office is on the sixth floor of 950 L'Enfant Plaza, Washington, D.C. Map Washington, D.C. area map with the Solar Office pinpointed Washington D.C. Area Map Official Washington, D.C. Tourism Site - Virtual Tour of Washington, D.C. Metro Directions The Metro rail and bus system is the environmentally-friendly and economical way to get to L'Enfant Plaza. The L'Enfant Plaza station is conveniently located on the blue, orange, yellow, and green lines.

250

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 15, 2011 April 15, 2011 CX-005676: Categorical Exclusion Determination Murray-Custer #1 Transmission Line Wood Pole Replacement CX(s) Applied: B1.3 Date: 04/15/2011 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration April 13, 2011 Algae samples back at the NREL lab, ready to be analyzed and run through the Fluorescent-Activated Cell Sorter, or FACS, which separates the cells. | Credit: NREL Staff Photographer Dennis Schroeder. Study: Algae Could Replace 17% of U.S. Oil Imports A new study from Pacific Northwest National Lab concludes that 17% of U.S. oil imports for transportation could be replaced by domestically-produced algae biofuels. April 12, 2011 Beep Beep! King County, Washington Is Charging Up Savings King County uses $6.1 million to make investments that dramatically reduce

251

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

24, 2011 24, 2011 Chemical engineer Alan Zacher 10 Questions for a Chemical Engineer: Alan Zacher Chemical engineer Alan Zacher took some time to share advice for students interested in science and engineering and give us the download on his work developing propylene glycol from renewable sources. March 24, 2011 CX-005523: Categorical Exclusion Determination Washington-City-Bellevue CX(s) Applied: A9, A11, B5.1 Date: 03/24/2011 Location(s): Bellevue, Washington Office(s): Energy Efficiency and Renewable Energy March 22, 2011 EIS-0245-SA-03: Supplement Analysis Determination Management of Spent Nuclear Fuel from the K Basins at the Hanford Site, Richland, WA March 22, 2011 EIS-0422: Notice of Availability of the Record of Decision Central Ferry to Lower Monumental 500-kilovolt Transmission Line Project

252

Program director`s overview report for the Office of Health & Environmental Research  

Science Conference Proceedings (OSTI)

LBL performs basic and applied research and develops technologies in support of the Office of Health and Environmental Research`s mission to explore and mitigate the long-term health and environmental consequences of energy use and to advance solutions to major medical challenges. The ability of the Laboratory to engage in this mission depends upon the strength of its core competencies. In addition, there are several key capabilities that are cross-cutting, or underlie, many of the core competencies. Attention is focused on the following: Facilities and resources; research management practices; research in progress; program accomplishments and research highlights; program orientation; work for non-OHER organizations DOE; critical issues; and resource orientation.

Gilbert, D. [ed.

1994-02-01T23:59:59.000Z

253

Cost management improvement in the Office of Environmental Management 1991-1995. Progress report  

SciTech Connect

The Department of Energy`s (DOE`s) Office of Environmental Management (EM) has been proactive in meeting the cost management challenges of environmental management activities. EM recognized the need for defining and establishing good cost management practices and has, during the first half of the 1990s, initiated more than a dozen major cost-management-related activities that have resulted in: Measureable improvement in cost-and cost-related management practices; Improved communication between field and Headquarters and among field sites; Development of cost management tools; Hiring of cost professionals; Involving regulators and stakeholders early in the planning process. The purposes of this progress report are to summarize EM`s cost management initiatives, report on the results of its proactive approach to cleaning up the environment at reasonable cost, and identify future cost management needs.

1995-12-01T23:59:59.000Z

254

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 4, 2011 April 4, 2011 CX-005572: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant - Washington-Tribe-Cowlitz Indian Tribe CX(s) Applied: B2.5, B5.1 Date: 04/04/2011 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy March 30, 2011 CX-005577: Categorical Exclusion Determination Provision of Funds to the Confederated Tribes of the Colville Reservation for the Purchase of the Ninemile Creek Property Date: 03/30/2011 Location(s): Washington Office(s): Bonneville Power Administration March 27, 2011 CX-005474: Categorical Exclusion Determination Charging Stations - Willis D. Tucker Park CX(s) Applied: B5.1 Date: 03/14/2011 Location(s): Snohomish, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy

255

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 27, 1998 August 27, 1998 EA-1260: Finding of No Significant Impact Transfer of 1100 Area, Southern Rail Connection and Rolling Stock, Hanford Site, Richland, Washington August 27, 1998 EA-1260: Final Environmental Assessment and Finding of No Significant Impact Transfer of 1100 Area, Southern Rail Connection and Rolling Stock, Hanford Site, Richland, Washington August 13, 1998 EIS-0229: Notice of Availability of the Amended Record of Decision Storage and Disposition of Weapons-Usable Fissile Materials August 1, 1998 EIS-0245-SA-01: Supplement Analysis Management of Spent Nuclear Fuel from the K Basins at the Hanford Site, Richland, Washington May 1, 1998 EIS-0189: Supplement Analysis Tank Waste Remediation System July 28, 1997 EA-1203: Final Environmental Assessment Trench 33 Widening in 218-W-5 Low-level Burial Ground, Hanford Site,

256

Office of Inspector General audit report on credit card usage at the Ohio Field Office and the Fernald and Miamisburg Environmental Management Projects  

SciTech Connect

In 1994 the Department of Energy (Department) obtained the services of Rocky Mountain BankCard System, through the use of a General Services Administration contract, as a means for the Department and its contractors to make small purchases. The use of credit cards was expected to simplify small purchase procedures and improve cash management. The Ohio Field Office (Field Office) uses the credit card system and oversees usage by its area offices. Contractors under the Field Office also use the credit card system to make small purchases. The Office of Inspector General (OIG) has issued one audit report concerning the use of credit cards. In April 1996, the OIG issued Report WR-B-96-06, Audit of Bonneville Power Administration`s Management of Information Resources. The audit concluded that improvements could be made in implementing credit card and property procedures in Bonneville`s management of computer-related equipment. Specifically, many credit card purchases were made by employees whose authority to buy was not properly documented, and the purchasing files often lacked invoices that would show what was purchased. Additionally, some cardholders split purchases to avoid credit card limits. The objective of this audit was to determine whether the Field Office, Fernald and Miamisburg Environmental Management Projects, Fluor Daniel, and B and W were using credit cards for the appropriate purposes and within the limitations established by Federal and Departmental regulations.

1999-03-01T23:59:59.000Z

257

Program director`s report for the Office of Health and Environmental Research  

Science Conference Proceedings (OSTI)

LBNL performs basic and applied research and develops technologies in support of the Department of Energy Office of Health and Environmental Research`s mission to explore and mitigate the long-term health and environmental consequences of energy use and to advance solutions to major medical challenges. The ability of the Laboratory to engage in this mission depends upon the strength of its core competencies. In addition, there are several key capabilities that are crosscutting, or underlie, many of the core competencies. They are: bioscience and biotechnology; environmental assessment and remediation; advanced detector systems; materials characterization and synthesis; chemical dynamics, catalysis, and surface science; advanced technologies for energy supply and energy efficiency; particle and photon beams; national research facilities; computation and information management; engineering design and fabrication technologies; and education of future scientists and engineers. Research in progress and major accomplishments are summarized for projects in analytical technology; environmental research; health effects; molecular carcinogenesis; general life sciences; human genome project; medical applications; and imaging of E-binding proteins.

NONE

1995-07-01T23:59:59.000Z

258

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 16, 2005 March 16, 2005 EIS-0312-SA-02: Supplement Analysis Fish and Wildlife Implementation Plan December 23, 2004 EIS-0183: DOE Notice of Availability of the Record of Decision Hopkins Ridge Wind Interconnection Project September 3, 2004 EIS-0346: EPA Notice of Availability of the Draft Environmental Impact Statement Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington September 3, 2004 EIS-0346: Draft Environmental Impact Statement Salmon Creek Project August 27, 2004 EIS-0349: Final Environmental Impact Statement BP Cherry Point Cogeneration Project August 27, 2004 EIS-0349: EPA Notice of Availability of the Final Environmental Impact Statement BP Cherry Point Cogeneration Project, Whatcom County, Washington

259

CEQ Environmental Justice Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

JUSTICE JUSTICE Guidance Under the National Environmental Policy Act Council on Environmental Quality Executive Office of the President Old Executive Office Building, Room 360 Washington, D.C. 20502 (202)395-5750 http://www.whitehouse.gov/CEQ/ December 10, 1997 ii Table of Contents I. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 II. Executive Order 12898 and the Presidential Memorandum . . . . . . . . . . . . . 3 III. Executive Order 12898 and NEPA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 A. NEPA Generally . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 B. Principles for Considering Environmental Justice under NEPA . . . . . . . . . . . . . 8 1. General Principles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 2. Additional Considerations . . . . . . . . . . . . . . . . . . . . . .

260

United States Department of Energy Richland Operations Office Environmental Protection Implementation Plan: November 9, 1993, to November 9, 1994  

SciTech Connect

The hub of today`s programs at the Hanford Site are activities dedicated to managing stored and new wastes and cleanup of waste sites. To ensure focused planning and implementing efforts for these programs, management of the site is assigned to DOE`s Office of Environmental Restoration and Waste Management. This report describes policies and procedures in the following areas: Compliance activities; Environmental restoration; Waste management; and Technology development. Procedures for notification of environmental occurrences, long-range environmental protection planning and reporting, waste management programs; environmental monitoring programs, and quality assurance and data verification are also described and discussed.

1993-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington Washington Categorical Exclusion Determinations: Washington Location Categorical Exclusion Determinations issued for actions in Washington. DOCUMENTS AVAILABLE FOR DOWNLOAD November 22, 2013 CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration November 19, 2013 CX-010735: Categorical Exclusion Determination Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration September 24, 2013 CX-011171: Categorical Exclusion Determination Longview and Tillamook Substation Communication Upgrades CX(s) Applied: B1.7 Date: 09/24/2013

262

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 25, 2010 August 25, 2010 CX-003610: Categorical Exclusion Determination Ross-Lexington Number 1 Access Road Repair Project CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration August 25, 2010 CX-003609: Categorical Exclusion Determination Cushman North Fork Skokomish Powerhouse CX(s) Applied: A9 Date: 08/25/2010 Location(s): Tacoma, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 25, 2010 CX-003614: Categorical Exclusion Determination Badger Canyon Substation Radio Communication Tower Project CX(s) Applied: B1.7, B1.19 Date: 08/25/2010 Location(s): Benton County, Washington Office(s): Bonneville Power Administration August 24, 2010 CX-003613: Categorical Exclusion Determination

263

The DOE Office of Environmental Management International Collaboration Program Overview: Interactions, Agreements, and Future Direction  

Science Conference Proceedings (OSTI)

As the lead U.S. agency for the environmental cleanup, the Department of Energy (DOE) Office of Environmental Management (EM) carries out international activities in support of U.S. policies and objectives regarding accelerated risk reduction and remediation of the environmental legacy of the nation's nuclear weapons program and government-sponsored nuclear energy research. To achieve this, EM pursues collaborations with foreign government organizations, educational institutions, and private industry to assist in identifying technologies and promote international collaborations that leverage resources and link international experience and expertise. An initiative of the International Program is to link international experience and expertise to the technical needs of the overall EM mission and to foster further collaboration with international partners to promote those needs. This paper will provide an overview of the current international program and how it plans to leverage existing, and when necessary, new international partnerships to support the overall EM cleanup mission. In addition it will examine the future vision of the international program to promote the EM mission through a focus on transformational solutions, science, and technology development.

Marra, James C.; Fox, Kevin M.; Jannik, Gerald T.; Farfan, Eduardo B.; Kim, Dong-Sang; Vienna, John D.; Roach, Jay; Aloy, A. S.; Stefanovsky, S. V.; Lopukh, D. B.; Bondarkov, M. D.; Gerdes, Kurt D.; Han, Ana M.

2010-02-10T23:59:59.000Z

264

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 7, 2011 July 7, 2011 CX-006111: Categorical Exclusion Determination Washington-Tribe-Stillaguamish Tribe of Indians CX(s) Applied: A1, A9, B2.5, B5.1 Date: 07/07/2011 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy July 7, 2011 CX-006262: Categorical Exclusion Determination Central Ferry Fiber Project CX(s) Applied: B1.7, B4.7 Date: 07/07/2011 Location(s): Walla Walla County, Washington Office(s): Bonneville Power Administration July 2, 2011 CX-008688: Categorical Exclusion Determination Installation of equipment at Wahkiakum Public Utility District's Cathlamet Substation CX(s) Applied: B4.6 Date: 07/02/2011 Location(s): Washington Offices(s): Bonneville Power Administration June 30, 2011 CX-008011: Categorical Exclusion Determination Install EMSL Super-Computer Power Infrastructure

265

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 1, 2012 February 1, 2012 CX-007984: Categorical Exclusion Determination Explosives Research Capability Expansion, 300 Area, Hanford Site CX(s) Applied: B3.6 Date: 02/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office January 30, 2012 CX-007955: Categorical Exclusion Determination Exe-Guard (Formerly Whitelist) Antivirus Project CX(s) Applied: A1, A9, A11, B1.2, B1.7 Date: 01/30/2012 Location(s): Washington Offices(s): National Energy Technology Laboratory January 27, 2012 CX-007880: Categorical Exclusion Determination Evergreen State Solar Partnership CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Washington Offices(s): Golden Field Office January 13, 2012 CX-007980: Categorical Exclusion Determination Washington River Protection Solutions LLC - Proposed Actions For Calendar

266

Identifying the sources of subsurface contamination at the Hanford site in Washington using high-precision uranium isotopic measurements  

E-Print Network (OSTI)

Secretary of the Office of Environmental Management,Office of Science and Technology, Environmental Management

Christensen, John N.; Dresel, P. Evan; Conrad, Mark E.; Maher, Kate; DePaolo, Donald J.

2004-01-01T23:59:59.000Z

267

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 1, 2002 March 1, 2002 EIS-0333: Draft Environmental Impact Statement Bonneville Power Administration, Benton County, Washington March 1, 2002 EA-1405: Final Environmental Assessment Transuranic Waste Retrieval from the 218-W-4B and 218-W-4C Low-Level Burial Grounds, Hanford Site, Richland, Washington February 27, 2002 EIS-0183: DOE Notice of Availability of the Record of Decision Mint Farm Generation Project February 27, 2002 EIS-0285-SA-46: Supplement Analysis Transmission System Vegetation Management Program February 27, 2002 EIS-0285-SA-45: Supplement Analysis Transmission System Vegetation Management Program February 15, 2002 EIS-0285-SA-42: Supplement Analysis Transmission System Vegetation Management Program February 1, 2002 EIS-0332: Draft Environmental Impact Statement

268

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 ENVIRONMENTAL ASSESSMENT FOR PROPOSED ENERGY CONSERVATION STANDARDS FOR RESIDENTIAL CLOTHES WASHERS December 2000 U.S. Department of Energy Assistant Secretary, Energy Efficiency & Renewable Energy Office of Building Research and Standards Washington, DC 20585 ENVIRONMENTAL ASSESSMENT FOR RESIDENTIAL CLOTHES WASHERS TABLE OF CONTENTS 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-1 2. PURPOSE AND NEED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-1 3. ALTERNATIVES INCLUDING THE PROPOSED ACTION . . . . . . . . . . . . . . . . . EA-2 3.1 No Action Alternative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-2 3.2 Proposed Standard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-2 3.3 Alternative Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-3 3.4 Impacts of Proposed and Alternative Standards

269

U.S. Department of Energy Office of Legacy Management National Envkonmental Policy Act Environmental Checklist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- - 19-10 U.S. Department of Energy Office of Legacy Management National Envkonmental Policy Act Environmental Checklist Project/Activity: Drill one exploratory hole on L.T. c-WM-17 by Golden Eagle Uranium A. Brief Project! Activity Descl'iptioll Golden Eagle Uranium (LLC) proposes to drill one 5-inch-diameter exploratory borehole on U.S. Department of Energy (DOE) lease tract C-WM-17, located in western Montrose County, Colorado. The drilling would be completed by a truck-mounted rotary drill rig capable of boring to 1,000 feet (ft) below ground surface (bgs). The proposed location of the drill hole is in a previously disturbed area and is adjacent to a two-track dirt road. Access to the site would be on existing dirt roads. The drilling would be completed dry to an estimated depth of 550 ft bgs. Once data are collected, the hole

270

GREEN AND BLUE SCHOOLS: THE USE OF ENVIRONMENTALLY SENSITIVE RAINWATER DESIGN AT GEORGETOWN VISITATION PREPARATORY SCHOOL IN GEORGETOWN, WASHINGTON DC.  

E-Print Network (OSTI)

??The artful management of stormwater has a capability to create educational arenas by combining environmentally sensitive rainwater design with education. School settings provide great opportunities (more)

Jensen, Allison Palmer

2012-01-01T23:59:59.000Z

271

News From the D.C. Office: Energy-Saving Office Equipment, Part...  

NLE Websites -- All DOE Office Websites (Extended Search)

Aerial view of Washington D.C. News From the D.C. Office Energy-Saving Office Equipment, Part 1 More on the DC Office efficiency up-grade: Lighting, Office Equipment: Part 2...

272

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 15, 2013 July 15, 2013 CX-010738: Categorical Exclusion Determination 2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 07/15/2013 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration July 2, 2013 CX-010588: Categorical Exclusion Determination Chehalis Substation Tree Clearing CX(s) Applied: B1.3 Date: 07/02/2013 Location(s): Washington Offices(s): Bonneville Power Administration July 1, 2013 CX-010589: Categorical Exclusion Determination Nine Canyon Communication Tower Addition CX(s) Applied: B4.6 Date: 07/01/2013 Location(s): Washington Offices(s): Bonneville Power Administration June 25, 2013 CX-010429: Categorical Exclusion Determination Harbour Pointe Small Generator Integration

273

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 3, 2011 March 3, 2011 CX-005410: Categorical Exclusion Determination North Bonneville-Alcoa Number 1 and 2 Transmission Line Corridor CX(s) Applied: B1.3 Date: 03/03/2011 Location(s): Clark County, Washington Office(s): Bonneville Power Administration March 3, 2011 CX-005409: Categorical Exclusion Determination Olympia-Grand Coulee Number 1 Transmission Line CX(s) Applied: B1.3 Date: 03/03/2011 Location(s): Washington Office(s): Bonneville Power Administration March 2, 2011 CX-005379: Categorical Exclusion Determination Insulator Replacement in Agricultural Lands Along the Grand Coulee-Bell Number 3/Grand Coulee-Westside No. 1 Double Circuit 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/02/2011 Location(s): Lincoln County, Washington Office(s): Bonneville Power Administration

274

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 5, 2010 October 5, 2010 CX-004255: Categorical Exclusion Determination Replace Spacer Dampers Along the Chief Joseph PH-Chief Joseph Number 6 500-Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 10/05/2010 Location(s): Douglas County, Washington Office(s): Bonneville Power Administration October 4, 2010 CX-004076: Categorical Exclusion Determination East Omak Substation Fiber Project CX(s) Applied: B1.15 Date: 10/04/2010 Location(s): Okanogan County, Washington Office(s): Bonneville Power Administration September 30, 2010 CX-004116: Categorical Exclusion Determination Advanced Energy Efficient Building Technologies for High Performance Hospitals CX(s) Applied: A9, A11 Date: 09/30/2010 Location(s): Redmond, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy

275

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 21, 2011 September 21, 2011 CX-006842: Categorical Exclusion Determination Removal of the 204-AR Facility Diesel Generator and Associated Underground 550 Gallon Fuel Tank CX(s) Applied: B6.1 Date: 09/21/2011 Location(s): Richland, Washington Office(s): River Protection-Richland Operations Office September 21, 2011 CX-006842: Categorical Exclusion Determination Removal of the 204-AR Facility Diesel Generator and Associated Underground 550 Gallon Fuel Tank CX(s) Applied: B6.1 Date: 09/21/2011 Location(s): Richland, Washington Office(s): River Protection-Richland Operations Office September 20, 2011 CX-007036: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project - North Service Center CX(s) Applied: B5.1 Date: 09/20/2011 Location(s): Seattle, Washington

276

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 14, 2011 June 14, 2011 CX-006253: Categorical Exclusion Determination North Bonneville-Ross #1 230-Kilovolt, North Bonneville-Troutdale #2 230-Kilovolt Transmission Line Maintenance CX(s) Applied: B4.13 Date: 06/14/2011 Location(s): Clark County, Washington Office(s): Bonneville Power Administration June 10, 2011 CX-006198: Categorical Exclusion Determination South Tacoma - Frederickson Power Fiber Project CX(s) Applied: B4.7 Date: 06/10/2011 Location(s): Pierce County, Washington Office(s): Bonneville Power Administration June 9, 2011 CX-006197: Categorical Exclusion Determination Omak Area 3G Radio Site Upgrades CX(s) Applied: B1.19 Date: 06/09/2011 Location(s): Okanogan, Washington Office(s): Bonneville Power Administration June 8, 2011 CX-006049: Categorical Exclusion Determination

277

NUCLEAR SUBSTANCE LABORATORY SELF-AUDIT CHECKLIST Office of Environmental Health and Safety Title: Radiation Safety Self-Audit Checklist  

E-Print Network (OSTI)

NUCLEAR SUBSTANCE LABORATORY SELF-AUDIT CHECKLIST Office of Environmental Health and Safety Title for Handling Packages Containing Nuclear Substances" posters posted. Storage area signed, included 24 hour contact information Nuclear Substance Permit and all attachments posted (eg. Conditions ­ general, special

Beaumont, Christopher

278

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2010 1, 2010 CX-002359: Categorical Exclusion Determination Validation of Innovative Exploration Technologies at the Colado, Nevada, Geothermal Prospect CX(s) Applied: B3.1, A9 Date: 05/11/2010 Location(s): Colado, Nevada Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 10, 2010 CX-002368: Categorical Exclusion Determination Puget Sound Tidal Energy Demonstration Project: Environmental and Permitting Activities CX(s) Applied: B3.1, B3.3, A9 Date: 05/10/2010 Location(s): Puget Sound, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 10, 2010 CX-002284: Categorical Exclusion Determination Environmental Effects of Sediment Transport Alteration and Impacts on Protected Species: Edgartown Tidal Energy Project

279

Carlsbad Field Office Receives New Mexico's Silver Award for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carlsbad Field Office Receives New Mexico's Silver Award for Carlsbad Field Office Receives New Mexico's Silver Award for Environmental Excellence Carlsbad Field Office Receives New Mexico's Silver Award for Environmental Excellence August 1, 2012 - 12:00pm Addthis DOE Carlsbad Field Office Deputy Manager Ed Ziemianski presents a Waste Isolation Pilot Plant (WIPP) team with the Green Zia Program Silver Level Leader award from the New Mexico Environment Department earlier this month in recognition of environmental initiatives. Shown right of Ziemianski is Farok Sharif, Washington TRU Solutions LLC, the WIPP management and operating contractor, President and General Manager. DOE Carlsbad Field Office Deputy Manager Ed Ziemianski presents a Waste Isolation Pilot Plant (WIPP) team with the Green Zia Program Silver Level

280

Environmental Assessment and Finding of No Significant Impact: Widening Trench 36 of the 218-E-12B Low-Level Burial Ground, Hanford Site, Richland, Washington  

SciTech Connect

This environmental assessment was prepared to assess potential environmental impacts associated with the proposed action to widen and operate unused Trench 36 in the 218-E-12B Low-Level Burial Ground for disposal of low-level waste. Information contained herein will be used by the Manager, U.S. Department of Energy, Richland Operations Office, to determine if the Proposed Action is a major federal action significantly affecting the quality of the human environment. If the Proposed Action is determined to be major and significant, an environmental impact statement will be prepared. If the Proposed Action is determined not to be major and significant, a Finding of No Significant Impact will be issued and the action may proceed. Criteria used to evaluate significance can be found in Title 40, Code of Federal Regulations 1508.27. This environmental assessment was prepared in compliance with the ''National Environmental Policy Act of1969'', as amended, the Council on Environmental Quality Regulations for Implementing the Procedural Provisions of ''National Environmental Policy Act'' (Title 40, Code of Federal Regulations 1500-1508), and the U.S. Department of Energy Implementing Procedures for ''National Environmental Polio Act'' (Title 10, Code of Federal Regulations 1021). The following is a description of each section of this environmental assessment. (1) Purpose and Need for Action. This section provides a brief statement concerning the problem or opportunity the U.S, Department of Energy is addressing with the Proposed Action. Background information is provided. (2) Description of the Proposed Action. This section provides a description of the Proposed Action with sufficient detail to identify potential environmental impacts. (3) Alternatives to the Proposed Action. This section describes reasonable,alternative actions to the Proposed Action, which addresses the Purpose and Need. A No Action Alternative, as required by Title 10, Code of Federal Regulations 1021, also is described. (4) Affected Environment. This section provides a brief description of the locale in which the Proposed Action would take place. (5) Environmental Impacts. This section describes the range of environmental impacts, beneficial and adverse, of the Proposed Action. Impacts of alternatives briefly are discussed. (6) Permits and Regulatory Requirements. This section provides a brief description of permits and regulatory requirements for the Proposed Action. (7) Organizations Consulted. This section lists any outside groups, agencies, or individuals contacted as part of the environmental assessment preparation and/or review. (8) References. This section provides a list of documents used to contribute information or data in preparation of this environmental assessment.

N /A

1999-02-11T23:59:59.000Z

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

THE DOE OFFICE OF ENVIRONMENTAL MANAGEMENT INTERNATIONAL COOPERATIVE PROGRAM: OVERVIEW OF TECHNICAL TASKS AND RESULTS  

SciTech Connect

The DOE Office of Environmental Management (DOE-EM) Office of Engineering and Technology is responsible for implementing EM's International Cooperative Program. Over the past 15 years, collaborative work has been conducted through this program with researchers in Russia, Ukraine, France, United Kingdom and Republic of Korea. Currently, work is being conducted with researchers in Russia and Ukraine. Efforts aimed at evaluating and advancing technologies to support U.S. high-level waste (HLW) vitrification initiatives are being conducted in collaboration with Russian researchers. Work at Khlopin Radium Institute (KRI) is targeted at improving the throughput of current vitrification processes by increasing melting rate. These efforts are specifically targeted at challenging waste types identified at the Savannah River Site (SRS) and Hanford Site. The objectives of current efforts at SIA Radon are to gain insight into vitrification process limits for the cold crucible induction melter (CCIM) technology. Previous demonstration testing has shown that the CCIM offers the potential for dramatic increases in waste loading and waste throughput. However, little information is known regarding operational limits that could affect long-term, efficient CCIM operations. Collaborative work with the Russian Electrotechnical University (ETU) 'LETI' is aimed at advancing CCIM process monitoring, process control and design. The goal is to further mature the CCIM technology and to establish it as a viable HLW vitrification technology. The greater than two year effort conducted with the International Radioecology Laboratory in the Ukraine recently completed. The objectives of this study were: to assess the long-term impacts to the environment from radiation exposure in the Chernobyl Exclusion Zone (ChEZ); and to provide information on remediation guidelines and ecological risk assessment within radioactively contaminated territories around the Chernobyl Nuclear Power Plant (ChNPP) based on the results of long-term field monitoring, analytical measurements, and numerical modeling of soils and groundwater radioactive contamination.

Marra, J.; Fox, K.; Farfan, E.; Jannik, T.

2009-12-08T23:59:59.000Z

282

The DOE Office of Environmental Management International Cooperative Program: Overview of Technical Tasks and Results  

SciTech Connect

The DOE Office of Environmental Management (DOE-EM) Office of Engineering and Technology is responsible for implementing EMs International Cooperative Program. Over the past 15 years, collaborative work has been conducted through this program with researchers in Russia, Ukraine, France, United Kingdom and Republic of Korea. Currently, work is being conducted with researchers in Russia and Ukraine. Efforts aimed at evaluating and advancing technologies to support U.S. high-level waste (HLW) vitrification initiatives are being conducted in collaboration with Russian researchers. Work at Khlopin Radium Institute (KRI) is targeted at improving the throughput of current vitrification processes by increasing melting rate. These efforts are specifically targeted at challenging waste types identified at the Savannah River Site (SRS) and Hanford Site. The objectives of current efforts at SIA Radon are to gain insight into vitrification process limits for the cold crucible induction melter (CCIM) technology. Previous demonstration testing has shown that the CCIM offers the potential for dramatic increases in waste loading and waste throughput. However, little information is known regarding operational limits that could affect long-term, efficient CCIM operations. Collaborative work with the Russian Electrotechnical University (ETU) LETI is aimed at advancing CCIM process monitoring, process control and design. The goal is to further mature the CCIM technology and to establish it as a viable HLW vitrification technology. The greater than two year effort conducted with the International Radioecology Laboratory in the Ukraine recently completed. The objectives of this study were: to assess the long-term impacts to the environment from radiation exposure in the Chernobyl Exclusion Zone (ChEZ); and to provide information on remediation guidelines and ecological risk assessment within radioactively contaminated territories around the Chernobyl Nuclear Power Plant (ChNPP) based on the results of long-term field monitoring, analytical measurements, and numerical modeling of soils and groundwater radioactive contamination.

Marra, James C.; Fox, Kevin M.; Jannik, Gerald T.; Farfan, Eduardo B.; Kim, Dong-Sang; Vienna, John D.; Roach, Jay; Aloy, A. S.; Stefanovsky, S. V.; Lopukh, D. B.; Bondarkov, M. D.; Gerdes, Kurt D.; Han, Ana M.

2010-01-22T23:59:59.000Z

283

Final Environmental Impact Statement for the Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement for the Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment DOE/EIS - 0440 Lead Federal Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agencies: U.S. Department of the Interior, Bureau of Land Management, Yuma Field Office U.S. Army Corps of Engineers U.S. Army Garrison Yuma Proving Ground Arizona Department of Environmental Quality Arizona Game and Fish Department December 2012 COVER SHEET Lead Federal Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agencies: U.S. Department of the Interior, Bureau of Land Management U.S. Army Corps of Engineers U.S. Army Garrison-Yuma Proving Ground Arizona Department of Environmental Quality

284

Environmental Justice: Guidance Under the National Environmental Policy Act  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

cover photograph of John Heinz National Wildlife Refuge at Tinicum cover photograph of John Heinz National Wildlife Refuge at Tinicum by John and Karen Hollingsworth Front cover photograph of school bus and children by Sam Kittner. ENVIRONMENTAL JUSTICE Guidance Under the National Environmental Policy Act Council on Environmental Quality Executive Office of the President Old Executive Office Building, Room 360 Washington, D.C. 20502 (202)395-5750 http://www.whitehouse.gov/CEQ/ December 10, 1997 Table of Contents I. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 II. Executive Order 12898 and the Presidential Memorandum . . . . . . . . . 3 III. Executive Order 12898 and NEPA . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 A. NEPA Generally . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

285

ISSUES REGARDING FEE STRUCTURE FOR THREE ENVIRONMENTAL MANAGEMENT CONTRACTS, CR-B-01-01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CR-B-01-01 CR-B-01-01 AUDIT REPORT ISSUES REGARDING FEE STRUCTURE FOR THREE ENVIRONMENTAL MANAGEMENT CONTRACTS MAY 2001 U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES DEPARTMENT OF ENERGY Washington, DC 20585 May 9, 2001 MEMORANDUM FOR THE DIRECTOR, OFFICE OF MANAGEMENT AND ADMINISTRATION FROM: Phillip L. Holbrook (Signed) Deputy Inspector General for Audit Services Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Issues Regarding Fee Structure for

286

Office of the Chief Financial Officer Annual Report 2009  

E-Print Network (OSTI)

Environmental Management Assistant Secretary for Fossil Energy OfficeEnvironmental Management Assistant Secretary for Fossil Energy OfficeOffice of Civilian Radioactive Waste Management ASSISTANT SECRETARY FOR ENVIRONMENTAL MANAGEMENT

Fernandez, Jeffrey

2010-01-01T23:59:59.000Z

287

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2011 1, 2011 CX-005337: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 03/01/2011 Location(s): Redmond, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory February 24, 2011 Online Registration Dates Set for 2011 Hanford Tours RICHLAND, Wash. - The U.S. Department of Energy (DOE) will open online registration on March 8 for tours of the Hanford Site and on March 15 for B Reactor-specific tours. February 24, 2011 Praveen Thallapally | photo courtesy of Pacific Northwest National Lab 10 Questions for a Materials Chemist: Praveen Thallapally Dr. Thallapally gave us an inside look at how he's working to advance carbon capture and geothermal technologies, developing a new class of

288

CURRENT PROGRESS AND FUTURE PLANS FOR THE DOE OFFICE OF ENVIRONMENTAL MANAGEMENT INTERNATIONAL PROGRAM  

SciTech Connect

The U.S. Department of Energy's (DOE) Office of Environmental Management (EM) has collaborated with various international institutes for many years on radioactive waste management challenges of mutual concern. Currently, DOE-EM is performing collaborative work with researchers at the Khlopin Radium Institute and the SIA Radon Institute in Russia and the Ukraine's International Radioecology Laboratory to explore issues related to high-level waste and to investigate experience and technologies that could support DOE-EM site cleanup needs. Specific initiatives include: (1) Application of the Cold Crucible Induction Heated Melter to DOE Wastes--SIA Radon and Savannah River National Laboratory; (2) Improved Solubility and Retention of Troublesome Components in SRS and Hanford Waste Glasses--Khlopin Radium Institute, Pacific Northwest National Laboratory and Savannah River National Laboratory; and (3) Long-term Impacts from Radiation/Contamination within the Chernobyl Exclusion Zone--International Radioecology Laboratory and Savannah River National Laboratory. This paper provides an overview of the status of the current International Program task activities. The paper will also provide insight into the future direction for the program. Specific ties to the current DOE-EM technology development multi-year planning effort will be highlighted as well as opportunities for future international collaborations.

Marra, J; Kurt D Gerdes, K; David Peeler, D; John Harbour, J; Kevin Fox, K

2007-11-16T23:59:59.000Z

289

Current Progress and Future Plans for the DOE Office of Environmental Management International Program  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy's (DOE) Office of Environmental Management (EM) has collaborated with various international institutes for many years on radioactive waste management challenges of mutual concern. Currently, DOE-EM is performing collaborative work with researchers at the Khlopin Radium Institute and the SIA Radon Institute in Russia and the Ukraine's International Radioecology Laboratory to explore issues related to high-level waste and to investigate experience and technologies that could support DOE-EM site cleanup needs. Specific initiatives include: - Application of the Cold Crucible Induction Heated Melter to DOE Wastes - SIA Radon and Savannah River National Laboratory; - Improved Solubility and Retention of Troublesome Components in SRS and Hanford Waste Glasses - Khlopin Radium Institute, Pacific Northwest National Laboratory and Savannah River National Laboratory; - Long-term Impacts from Radiation/Contamination within the Chernobyl Exclusion Zone, International Radioecology Laboratory and Savannah River National Laboratory. This paper provides an overview of the status of the current International Program task activities. The paper will also provide insight into the future direction for the program. Specific ties to the current DOE-EM technology development multi-year planning effort will be highlighted as well as opportunities for future international collaborations. (authors)

Gerdes, K.D. [Office of Engineering and Technology, Office of Environmental Management, U.S. Department of Energy, Washington, DC (United States); Marra, J. C.; Peeler, D.K.; Harbour, M.J.J.R.; Fox, K.M. [Savannah River National Laboratory, Aiken, SC (United States); Vienna, J.D. [Pacific Northwest National Laboratory, Richland, WA (United States); Aloy, A.S. [Khlopin Radium Institute, St. Petersburg (Russian Federation); Stefanovsky, S.V. [SIA Radon, Moscow (Russian Federation); Bondarkov, M.D. [International Radioecology Laboratory, Slavutych (Ukraine)

2008-07-01T23:59:59.000Z

290

THE U.S. DEPARTMENT OF ENERGY-OFFICE OF ENVIRONMENTAL MANAGEMENT'S INTERNATIONAL PROGRAM  

SciTech Connect

The U.S. Department of Energy's (DOE) Office of Environmental Management (EM) has collaborated with the various international institutes (e.g. Russian Federal Atomic Energy Agency--Rosatom and Ukraine government's Chornobyl Center-International Radioecology Laboratory (CC-IRL)) for many years on radioactive waste management challenges of mutual concern. Currently, EM is cooperating with Rosatom and the Ukraine's CC-IRL to explore issues related to high-level waste and to investigate experience and technologies that could support EM site cleanup needs. EM is currently implementing five collaborative projects with other international institutes on nuclear waste issues: (1) Application of the Cold Crucible Induction Heated Melter to DOE Wastes; SIA Radon, Moscow. (2) Design Improvements to the Cold Crucible Induction Heated Melter; Electrotechnical University, St. Petersburg. (3) Improve Retention of Radionuclides in Cement Type Waste Forms; Khlopin Radium Institute, St. Petersburg. (4) Improved Solubility and Retention of Troublesome Components in SRS and Hanford HLW Glasses; Khlopin Radium Institute, St. Petersburg. (5) Long-term Impacts from Radiation/Contamination within the Chornobyl Exclusion Zone, Chornobyl Center, International Radioecology Laboratory, Ukraine The purpose of this paper is to provide an overview of EM's objectives for participating in cooperative activities with various international institutes. Additionally, this paper presents programmatic and technical information on these activities, and outlines specific technical collaborations currently underway and planned to support DOE's cleanup and closure mission.

Harbour, J; James Marra, J; David Peeler, D; Jay Roach (NOEMAIL), J; Bond Calloway, B

2007-02-08T23:59:59.000Z

291

Categorical Exclusion Determinations: Office of River Protection-Richland  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2012 5, 2012 CX-009658: Categorical Exclusion Determination Mission Support Alliance Annual Categorical Exclusion for Small-Scale Research and Development, Laboratory Operations, and Pilot Projects under 10 CFR 1021, Subpart D, Appendix B CX(s) Applied: B3.6 Date: 12/05/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 5, 2012 CX-009657: Categorical Exclusion Determination Mission Support Alliance Annual Categorical Exclusion for Site Characterization and Environmental Monitoring under 10 CFR 1021, Subpart D, Appendix B CX(s) Applied: B3.1 Date: 12/05/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 5, 2012 CX-009656: Categorical Exclusion Determination Mission Support Alliance Annual Categorical Exclusion for Facility Safety

292

Office of Nuclear Safety | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Safety Office of Nuclear Safety Organization Office of Health and Safety Office of Environmental Protection, Sustainability Support & Corporate Safety Analysis Office of...

293

Decommissioning of eight surplus production reactors at the Hanford Site, Richland, Washington. Addendum (Final Environmental Impact Statement)  

Science Conference Proceedings (OSTI)

The first section of this volume summarizes the content of the draft environmental impact statement (DEIS) and this Addendum, which together constitute the final environmental impact statement (FEIS) prepared on the decommissioning of eight surplus plutonium production reactors at Hanford. The FEIS consists of two volumes. The first volume is the DEIS as written. The second volume (this Addendum) consists of a summary; Chapter 9, which contains comments on the DEIS and provides DOE`s responses to the comments; Appendix F, which provides additional health effects information; Appendix K, which contains costs of decommissioning in 1990 dollars; Appendix L, which contains additional graphite leaching data; Appendix M, which contains a discussion of accident scenarios; Appendix N, which contains errata; and Appendix 0, which contains reproductions of the letters, transcripts, and exhibits that constitute the record for the public comment period.

Not Available

1992-12-01T23:59:59.000Z

294

Categorical Exclusion Determinations: Office of Energy Efficiency...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Projects CX(s) Applied: B5.1 Date: 04132010 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 13, 2010 CX-001689:...

295

Categorical Exclusion Determinations: Office of Energy Efficiency...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Applied: B3.3, B3.6 Date: 05252011 Location(s): Snohomish County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 25, 2011 CX-006015:...

296

Categorical Exclusion Determinations: Office of Energy Efficiency...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Turbines CX(s) Applied: B3.1, B3.3 Date: 07152011 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 15, 2011 CX-006238:...

297

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 2, 2004 August 2, 2004 EIS-0349: Final Environmental Impact Statement, Volume 2 BP Cherry Point Cogeneration Project Volume 2 August 2, 2004 EIS-0349: Final Environmental Impact Statement, Figures BP Cherry Point Cogeneration Project August 2, 2004 EIS-0349: Final Environmental Impact Statement, Appendices BP Cherry Point Cogeneration Project June 23, 2004 EIS-0026-SA-02: Supplement Analysis Disposal of Polychlorinated Biphenyl-Commingled Transuranic Waste at the Waste Isolation Pilot Plant April 7, 2004 EIS-0169-SA-08: Supplement Analysis Yakima/Klickitat Fisheries Project, Boone Pond Acclimation Site, Cle Elum, Kittitas County, Washington March 12, 2004 EA-1486: Final Environmental Assessment East and West Diversion Screening Proposal Methow Valley Irrigation District Project

298

DOE/EA-1728-F Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8-F 8-F Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington U.S. Department of Energy Richland Operations Office Richland, Washington 99352 DOE/EA-1728-F 1 2 3 4 5 6 This page intentionally left blank. 7 8 U.S. Department of Energy DOE/EA-1728-F Final Environmental Assessment iii February 2012 CONTENTS 1 2 1.0 INTRODUCTION ........................................................................................................................... 1 3 1.1 NATIONAL ENVIRONMENTAL POLICY ACT DETERMINATION 4 RECOMMENDATION ...................................................................................................... 1 5 1.2 PURPOSE AND NEED FOR AGENCY ACTION ........................................................... 1 6

299

Categorical Exclusion Determinations: Environmental Management | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 13, 2010 January 13, 2010 CX-000471: Categorical Exclusion Determination Limited Prescribed Burning on the Hanford Site During October, November, and December of 2010 to Maintain Critical Fire Breaks CX(s) Applied: B1.3 Date: 01/13/2010 Location(s): Benton County, Washington Office(s): Environmental Management, Office of River Protection-Richland Office January 5, 2010 CX-000799: Categorical Exclusion Determination Sable Systems Oxzilla Oxygen Analyzer CX(s) Applied: B3.6 Date: 01/05/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office January 5, 2010 CX-000800: Categorical Exclusion Determination Y593 Procure, Design and Install X-Ray Diffraction and X-Ray Fluorescence Instruments, 735-11A CX(s) Applied: B3.6 Date: 01/05/2010

300

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 21, 2012 May 21, 2012 CX-008716: Categorical Exclusion Determination Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-Kilovolt (kV) Line/Convert Microwave Signals From Analog To Digital CX(s) Applied: B1.7 Date: 05/21/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration May 18, 2012 CX-009096: Categorical Exclusion Determination U.S. Customs and Border Protection Non-Intrusive Inspection Tests CX(s) Applied: B3.10, B3.11 Date: 05/18/2012 Location(s): Washington Offices(s): Pacific Northwest Site Office May 17, 2012 CX-008717: Categorical Exclusion Determination Relocation of Wood Poles on Centralia B Street No. 1 for Proposed Centralia City Light May Street Substation CX(s) Applied: B4.6 Date: 05/17/2012

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Pacific Northwest Laboratory: Annual report for 1986 to the DOE Office of Energy Research: Part 2, Environmental sciences  

Science Conference Proceedings (OSTI)

This report summarizes progress in environmental sciences research conducted by Pacific Northwest Laboratory (PNL) for the Office of Health and Environmental Research in FY 1986. The program is focused on terrestrial, subsurface, and coastal marine systems, and this research forms the basis, in conjunction with remote sensing, for definition and quantification of processes leading to impacts at the global level. This report is organized into sections devoted to Detection and Management of Change in Terrestrial Systems, Biogeochemical Phenomena, Subsurface Microbiology and Transport, Marine Sciences, and Theoretical (Quantitative) Ecology. Separate abstracts have been prepared for individual projects.

Not Available

1987-09-01T23:59:59.000Z

302

Corel Office Document  

Office of Legacy Management (LM)

All Departmental Elements Office of Management, Budget and Evaluation U.S. Department of Energy Washington, D.C. POLICY Approved: 05-20-02 SUBJECT: MANAGEMENT POLICY FOR PLANNING,...

303

Authorizing appropriations to the Office of Research and Development, Environmental Protection Agency. Report together with additional views, 95th Congress, 1st Session  

SciTech Connect

The purpose of the bill is to authorize appropriations to the Office of Research and Development, Environmental Protection Agency for fiscal year 1978, to improve the direction and quality of environmental research within the EPA, to promote the coordination of environmental research and development efforts, and to establish the EPA Science Advisory Board by law.

1977-01-01T23:59:59.000Z

304

Office of Information Resources  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Personnel Management (OPM) Billing System Office of Personnel Management (OPM) Billing System Bureau: Department of Energy Project Unique ID: 01 9-1 0-01 -22-02-3048-00 Date: 02/08/2008 A. CONTACT INFORMATION 1) Who is the person completing this document? Joanne Csordas (HS-1.21), Office of Business Operations, Office of Resource Management, Office of Health, Safety and Security, U.S. Department of Energy, HS-1.21, 1000 Independence Avenue, SW, Washington D.C. 20585, (301) 903-3573 2) Who is the system owner? Joanne Csordas (HS-1.2 l), Office of Business Operations, Office of Resource Management, Office of Health, Safety and Security, U.S. Department of Energy, HS- 1.2 1, 1000 Independence Avenue, SW, Washington D.C. 20585, (301) 903-3573 3) Who is the system manager for this system or application?

305

U.S. Department of Energy Office of Inspector General  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Review of Allegations Involving Review of Allegations Involving Potential Misconduct by a Senior Office of Environmental Management Official Department of Energy Washington, DC 20585 December 29,2009 MEMORANDUM FOR FROM: Inspector General SUBJECT: INFORMATION: Review of Allegations Involving Potential Misconduct by a Senior Office of Environmental Management Official INTRODUCTION In September 2009, the Office of Inspector General (OIG) received multiple allegations concerning improprieties by a senior official with the Office of Environmental Management. The allegations involved potential violations of political activity restrictions, lack of impartiality i n performing official duties, misuse of position, and other related misconduct. Specific allegations concerned: 1. Orchestrating a $9 million American Recovery and Reinvestment Act of 2009 (Recovery

306

Washington, DC'  

Office of Legacy Management (LM)

of. Energy of. Energy Washington, DC' 26585 , The Honorable Gene Eriquez .~ City Hall I55 Deer Hill Avenue + Danbury/Connecticut 06180 .. -r. - Dear Mayor Eriquez: Secretary of Energy Hazel O!Leary has .announced a knew approach -to openness in. the Department of Energy (DOE) and its communications with the public. In support of th,is initiative, we are,pleased to forward the enclosed information, related to the former Sperry Products,'.Inc. site in your jurisdiction ,that performed,work for DOE or its predecessor agencies. Th,is informatipn is provided,for your information, use, and retenti~oh. DOE's Formeily Utilized Sites Remedial Action Program is responsible for. identification of sites used by'DOE's predecessor agencies, determining their current radiological condition and,

307

Department Washington,  

Office of Legacy Management (LM)

Washington, of Energy DC 20545 Mr. Roy J. Villella, Jr. Assistant Secretary Diebold, Incorporated 818 Mulberry Road, S.E. F. 0. Box 8230 Canton, Ohio 44711-8230 Dear Mr..Villella: Enclosed is your copy of the signed consent form for the survey of those portions of the Diebold property used by the former owner, Herring Hall and Marvin Safe Company, to machine uranium rod for the Manhattan Engineer District. I have directed our contractor, Oak Ridge National Laboratory (ORNL), to coordinate the specific time and details for the visit and survey. Mr. Woodrow Cottrell, ORNL, or his representative, will be contacting you in this regard. If you have any questions regarding the survey, please call me at (301) 353-5439. Sincerely, Andrew Wallo III, Designation

308

Washington Update  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Energy Management Federal Energy Management Program Federal/Utility Partnership Working Group David McAndrew April 14, 2010 Providence RI Washington Update Federal Energy Management Program femp.energy.gov 3 Presentation Overview * EO 13514 - Strategic Sustainability Plans * DOE's approach * EISA section 432 update * Outreach Opportunities - Federal Energy Management Awards - Energy Empowers Campaign - GovEnergy Federal Energy Management Program femp.energy.gov 4 EO13514 Sustainability Plans Update Federal Energy Management Program femp.energy.gov 5 EO 13514 Goals In addition to GHG goals, the EO requires agencies to meet sustainability targets, including: * 30% reduction in vehicle fleet petroleum use by 2020; * 26% reduction in potable, industrial, landscaping, and agricultural water consumption by 2020;

309

Washington Update  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Partnership Working Group (FUPWG) Utility Partnership Working Group (FUPWG) eere.energy.gov The Parker Ranch installation in Hawaii Federal Energy Management Program Federal/Utility Partnership Working Group David McAndrew October 20, 2010 Rapid City, SD Washington Update 2 | Federal Utility Partnership Working Group (FUPWG) eere.energy.gov Presentation Overview * FEMP Updates * GHG Guidance Update * EISA Section 432 Update * Mark Your Calendar 3 | Federal Utility Partnership Working Group (FUPWG) eere.energy.gov * Richard Kidd is leaving FEMP - Will become Deputy Assistant Secretary of the Army for Energy and Sustainability - Skye Schell will assume the role of interim Program Manager * Jesse Feinberg (Energetics) departed over the summer to attend grad school Columbia * Sarah Mabbitt (smabbitt@energetics.com)

310

Washington Update  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Energy Management Program Federal Energy Management Program Federal Utility Partnership Working Group Meeting: Washington Update Dr. Timothy Unruh October 25-26, 2011 Philadelphia, PA 2 | Federal Energy Management Program eere.energy.gov Presentation Overview  Federal Government Goals and Status  FEMP Update  UESC Program Overview and Goals  Mark Your Calendar: Spring 2012 FUPWG 3 | Federal Energy Management Program eere.energy.gov FEMP's Mission FEMP provides the services, tools, and expertise to Federal agencies to help them achieve their legislated and executive ordered energy, greenhouse gas, and water goals. This is delivered through project financing services, technical assistance, and communications and training. 4 | Federal Energy Management Program eere.energy.gov

311

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 12, 2011 August 12, 2011 CX-006472: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 08/12/2011 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 12, 2011 CX-006470: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 08/12/2011 Location(s): Lynden, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 12, 2011 CX-006468: Categorical Exclusion Determination Testing Subcontractor for Fenestration System Energy Performance Rating Development and Research CX(s) Applied: B3.6 Date: 08/12/2011 Location(s): Everett, Washington

312

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 10, 2009 December 10, 2009 CX-000349: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: A1, A9, B5.1 Date: 12/10/2009 Location(s): Everett, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory December 10, 2009 CX-000348: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: A1, A9, B5.1 Date: 12/10/2009 Location(s): Lynden, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory December 10, 2009 CX-000347: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: A1, A9, B5.1 Date: 12/10/2009 Location(s): Snohomish County, Washington

313

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 12, 2011 December 12, 2011 CX-008010: Categorical Exclusion Determination Small-Scale Research and Development Projects Using Nanoscale Materials CX(s) Applied: B3.15 Date: 12/12/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office December 9, 2011 CX-007481: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.23 Date: 12/09/2011 Location(s): Washington Offices(s): National Energy Technology Laboratory December 9, 2011 CX-007480: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.23 Date: 12/09/2011 Location(s): Washington Offices(s): National Energy Technology Laboratory December 9, 2011 CX-007479: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project

314

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 9, 2010 March 9, 2010 CX-001183: Categorical Exclusion Determination Replace Rock Creek-John Day Number 1 Spacers CX(s) Applied: B1.3 Date: 03/09/2010 Location(s): Klickitat County, Washington Office(s): Bonneville Power Administration March 3, 2010 CX-001185: Categorical Exclusion Determination Replace Spacer Dampers Along the Wautoma-Rock Creek Number 1 500 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/03/2010 Location(s): Benton County, Yakima County, Office(s): Bonneville Power Administration March 1, 2010 CX-001040: Categorical Exclusion Determination Puget Sound Clean Cities Coalition Petroleum Reduction Project - Conversion CX(s) Applied: B5.1 Date: 03/01/2010 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

315

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 29, 2006 November 29, 2006 EIS-0183: Record of Decision Electrical Interconnection of the Windy Point Wind Energy Project June 26, 2006 EIS-0397: Notice of Intent to Prepare an Environmental Impact Statement and Notice of Floodplain and Wetlands Involvement Lyle Falls Fishway Project May 1, 2006 EIS-0384: Draft Environmental Impact Statement Chief Joseph Hatchery Program March 31, 2006 EA-1547: Finding of No Significant Impact Fast Flux Test Facility Project, Hanford Site March 1, 2006 EA-1547: Final Environmental Assessment Sodium Residual Reaction/Removal and Other Deactivation Work Activities, Fast Flux Test Facility Project, Hanford Site, Richland, Washington February 17, 2006 EIS-0391: Notice to Extend Scoping Period Tank Closure and Waste Management for the Hanford Site, Richland, WA

316

Digitizing the Administrative Records of the U.S. Department of Energy Office of Environmental Management (Em) and Office of Legacy Management (LM) Ohio Sites  

Science Conference Proceedings (OSTI)

As former weapons sites close and are transitioned to the U.S. Department of Energy (DOE) Office of Legacy Management (LM), continued public involvement is essential for the successful turnover of long-term surveillance and maintenance (LTS and M) activities. During the environmental remediation process, public participation was a key factor in cleanup completion. The same level of commitment to encourage active public participation is true for the LTS and M activities at the LM sites, such as the Miamisburg Closure Project and the Fernald Closure Project. Community members participate in the transition and the decision-making processes for LTS and M as they did for the selection of response actions under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) cleanup process. [1] A key part of the post-closure activities for the Ohio Sites transitioning to LM from the DOE Office of Environmental Management (EM) is the preservation of site history and stakeholder involvement in the LTS and M activities that will continue during post-closure. In meeting the regulatory requirements of providing the CERCLA Administrative Record Reading Room for public access and to ensure that appropriate records are retrievable and available for all stakeholders, a decision was made to digitize the Miamisburg Closure Project and the Fernald Closure Project Administrative Records. This decision was, in part, based on the information and lessons learned from the digitization of the Rocky Flats Environmental Technology Site (RFETS) CERCLA Administrative Records (AR). The Ohio Sites effort was expanded to include the Living History Project from the Fernald Closure Project. In most cases, the CERCLA AR maintained by EM closure sites and transitioned to LM will provide adequate baselines for identifying and capturing the information required by LM for post-closure stewardship of the sites. The AR established under Section 113(k) [2] of CERCLA serves two primary purposes. First, the record contains those documents that form the basis for selection of a response action and comply with Section 113(j) [3]; judicial review of any issue concerning the adequacy of any response action is limited to the record. Second, Section 113(k) [2] requires that the AR act as a vehicle for public participation in selecting a response action. The AR is the body of documents that 'forms the basis' for the selection of a particular response action at a site and contains historic information that has future study value by scholars, historians, regulators, and other stakeholders. (authors)

Powell, J. [U.S. Department of Energy Office of Legacy Management, Cincinnati, Ohio (United States); Williams, K.; Walpole, S. [S.M. Stoller Corporation, Miamisburg, Ohio (United States); McKinney, R. [Source One Management, Inc., Denver, Colorado (United States)

2007-07-01T23:59:59.000Z

317

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 19, 2002 July 19, 2002 EIS-0285-SA-95: Supplement Analysis Transmission System Vegetation Management Program July 19, 2002 EIS-0285-SA-94: Supplement Analysis Transmission System Vegetation Management Program, Covington District Substations July 19, 2002 EIS-0285-SA-96: Supplement Analysis Transmission System Vegetation Management Program, Snohomish District Substations July 19, 2002 EIS-0285-SA-71: Supplement Analysis Transmission System Vegetation Management Program, located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington July 19, 2002 EIS-0285-SA-70: Supplement Analysis Transmission System Vegetation Management Program July 8, 2002 EIS-0189: Notice of Intent Supplemental Environmental Impact Statement for Disposal of Immobilized

318

Environmental assessment of facility operations at the U.S. Department of Energy Grand Junction Projects Office, Grand Junction, Colorado  

SciTech Connect

The US Department of Energy (DOE) has prepared a sitewide environmental assessment (EA) of the proposed action to continue and expand present-day activities on the DOE Grand Junction Projects Office (GJPO) facility in Grand Junction, Colorado. Because DOE-GJPO regularly proposes and conducts many different on-site activities, DOE decided to evaluate these activities in one sitewide EA rather than in multiple, activity-specific documents. On the basis of the information and analyses presented in the EA, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined by the National Environmental Policy Act (NEPA) of 1969. Therefore, preparation of an environmental impact statement is not required for facility operations, and DOE is issuing this Finding of No Significant Impact (FONSI).

NONE

1996-06-01T23:59:59.000Z

319

Technical Paper Series Congressional Budget Office Washington, D.C. Return on Cross-Border Investment: Why Does U.S. Investment Abroad Do Better?  

E-Print Network (OSTI)

Technical papers in this series are preliminary and are circulated to stimulate discussion and critical comment. These papers are not subject to CBOs formal review and editing processes. The analyses and conclusions expressed in them are those of the authors and should not be interpreted as those of the Congressional Budget Office. References in publications should be Despite the large size of U.S. net financial obligations to foreigners, U. S. residents have continued to earn more income on their assets abroad than foreigners have on their assets in the United States. In other words, the rate of return on U.S.-owned assets abroad is still higher than the rate of return on foreign-owned assets in the United States. The advantageous return gap for U.S. investment has reflected the much greater return on U.S. direct investments abroad than that on foreign direct investments in the United States. We investigate the validity of three major hypothesis advanced to explain the persistent return gap that has been so advantageous to U.S. direct investments: (1) the risk-compensating hypothesis, which claims that U.S. direct investments abroad are riskier than foreign direct investments in the United States and therefore command a higher return to compensate for their

Juann H. Hung; Angelo Mascaro

2004-01-01T23:59:59.000Z

320

EA-0429: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment EA-0429: Final Environmental Assessment Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington This environmental...

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Pacific Northwest Laboratory annual report for 1992 to the DOE Office of Energy Research. Part 2, Environmental sciences  

SciTech Connect

The 1992 Annual Report from Pacific Northwest Laboratory (PNL) to the US Department of Energy (DOE) describes research in environment and health conducted during fiscal year 1992. This report consists of four volumes oriented to particular segments of the PNL program, describing research performed for the DOE Office of Health and Environmental Research in the Office of Energy Research. The parts of the 1992 Annual Report are: Biomedical Sciences; Environmental Sciences; Atmospheric Sciences; and Physical Sciences. This Report is Part 2: Environmental Sciences. Included in this report are developments in Subsurface Science, Terrestrial Science, Laboratory-Directed Research and Development, Interactions with Educational Institutions, Technology Transfer, Publications, and Presentations. The research is directed toward developing a fundamental understanding of subsurface and terrestrial systems as a basis for both managing these critical resources and addressing environmental problems such as environmental restoration and global change. The Technology Transfer section of this report describes a number of examples in which fundamental research is laying the groundwork for the technology needed to resolve important environmental problems. The Interactions with Educational Institutions section of the report illustrates the results of a long-term, proactive program to make PNL facilities available for university and preuniversity education and to involve educational institutions in research programs. The areas under investigation include the effect of geochemical and physical phenomena on the diversity and function of microorganisms in deep subsurface environments, ways to address subsurface heterogeneity, and ways to determine the key biochemical and physiological pathways (and DNA markers) that control nutrient, water, and energy dynamics in arid ecosystems and the response of these systems to disturbance and climatic change.

Grove, L.K. [ed.; Wildung, R.E.

1993-03-01T23:59:59.000Z

322

DOE NEPA Compliance Officers  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Compliance Officers NEPA Compliance Officers NEPA Compliance Officers are listed first for Program Offices, then Power Marketing Administrations, then Field Offices. Please send updates to yardena.mansoor@hq.doe.gov Oct 04, 2013 Forrestal (FORS) Addresses: Germantown (GTN) Addresses: 1000 Independence Ave SW 1000 Independence Ave SW Washington, DC 20585 Washington, DC 20585-1290 . Use for U.S. Postal Service mail. 19901 Germantown Road Germantown, MD 20874-1290 Use for EXPRESS DELIVERY (e.g. Federal Express, UPS). NAME, OFFICE, E-MAIL FAX ADDRESS PHONE william.bierbower@hq.doe.gov Advanced Research Projects Agency-Energy 202-287-6585 FORS AR-1 20585 ARPA-E William Bierbower lori.gray@go.doe.gov Energy Efficiency and Renewable Energy, Golden Field Office 720-356-1568 720-356-1350 Department of Energy

323

Washington Closure Hanford, LLC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Neil Brosee President Washington Closure Hanford, LLC 2620 Fermi Avenue Richland, Washington 99354 WEA-201 0-02 Dear Mr. Brosee: This...

324

US Department of Energy Nevada Operations Office annual site environmental report, 1992. Volume 2, Appendices  

Science Conference Proceedings (OSTI)

These appendices contain 1992 NTS onsite and offsite environmental monitoring results. The onsite data presented are accompanied by summaries of statistical evaluations of the data. Other offsite data collected by the EPA are available from the US Environmental Protection Agency, Environmental Monitoring Systems Laboratory, Las Vegas, Nevada.

Black, S.C.; Latham, A.R.; Townsend, Y.E. [eds.

1993-09-01T23:59:59.000Z

325

Albuquerque Operations Office  

Office of Legacy Management (LM)

%r © J~4 %r © J~4 aDepartment of Energy Albuquerque Operations Office P.O. Box 5400 Albuquerue. New Mexico 87118 JUIl 0 198 Vicinity Property No. CA-401 _ U l Address; Mayer Street Bridgeville, Pennsylvania Cyclops Corporation 650 Washington Road Pittsburgh, Pennsylvania 15228 Dear Sir: Under the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, the Department of Energy (DOE) is authorized to conduct remedial action at properties contaminated with residual radioactive material from inactive uranium mill sites. Evaluation of your property identified above has revealed the presence of residual radioactive material in excess of standards established by the Environmental Protection Agency (EPA). Therefore, your property has been formally included by DOE for remedial action in the Uranium Mill Tailings

326

Portsmouth DUF6 Conversion Final EIS - Appendix D: Environmental Synopsis for the Depleted UF6 Conversion Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Portsmouth DUF Portsmouth DUF 6 Conversion Final EIS APPENDIX D: ENVIRONMENTAL SYNOPSIS FOR THE DEPLETED UF 6 CONVERSION PROJECT Environmental Synopsis D-2 Portsmouth DUF 6 Conversion Final EIS ENVIRONMENTAL SYNOPSIS FOR THE DEPLETED UF 6 CONVERSION PROJECT (Solicitation No. DE-RP05-01OR22717) October 2002 Environmental Assessment Division Argonne National Laboratory Argonne, Illinois Prepared for Office of Site Closure - Oak Ridge Office (EM-32) Office of Environmental Management U.S. Department of Energy Washington, D.C. October 2002 iii CONTENTS 1 INTRODUCTION........................................................................................................... 1 2 BACKGROUND.............................................................................................................

327

Paducah DUF6 Conversion Final EIS - Appendix D: Environmental Synopsis for the Depleted UF6 Conversion Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Paducah DUF Paducah DUF 6 Conversion Final EIS APPENDIX D: ENVIRONMENTAL SYNOPSIS FOR THE DEPLETED UF 6 CONVERSION PROJECT Environmental Synopsis D-2 Paducah DUF 6 Conversion Final EIS ENVIRONMENTAL SYNOPSIS FOR THE DEPLETED UF 6 CONVERSION PROJECT (Solicitation No. DE-RP05-01OR22717) October 2002 Environmental Assessment Division Argonne National Laboratory Argonne, Illinois Prepared for Office of Site Closure - Oak Ridge Office (EM-32) Office of Environmental Management U.S. Department of Energy Washington, D.C. October 2002 iii CONTENTS 1 INTRODUCTION........................................................................................................... 1 2 BACKGROUND............................................................................................................. 3 3

328

Office of Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis (SESA) SESA Home Mission & Functions Office of Sustainability, Environment, Safety and Anaylsis (SESA) Sustainability Support Environmental Policy & Assistance ...

329

Bioenergy Technologies Office: Sustainability  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Overview Financial Opportunities Publications Contact Us Sustainability The Bioenergy Technologies Office's activities are guided by a commitment to environmental, economic,...

330

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 7, 2013 January 7, 2013 CX-009785: Categorical Exclusion Determination Roosevelt Radio Station Emergency Generator Removal and Replacement CX(s) Applied: B1.3 Date: 01/07/2013 Location(s): Washington Offices(s): Bonneville Power Administration January 3, 2013 CX-010563: Categorical Exclusion Determination Pacific Northwest National Laboratory- Non-Wire Methods for Transmission Congestion Management Through Predictive Simulation and Optimization CX(s) Applied: B3.6 Date: 01/03/2013 Location(s): Washington, North Carolina, Illinois, Oregon Offices(s): Advanced Research Projects Agency-Energy December 27, 2012 CX-009699: Categorical Exclusion Determination Continuation of Yakama Nation Sturgeon Management Project CX(s) Applied: B1.20 Date: 12/27/2012 Location(s): Washington, Washington

331

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 5, 2013 April 5, 2013 CX-010154: Categorical Exclusion Determination Digital Communication System Upgrade Project: 'D' Analog System Retirement and #WC SONET Ring CX(s) Applied: B1.19 Date: 04/05/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 3, 2013 CX-010155: Categorical Exclusion Determination Augspurger Radio Tower Replacement Project CX(s) Applied: B1.19 Date: 04/03/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 3, 2013 CX-010094: Categorical Exclusion Determination Activity-Specific Categorical Exclusion for Deep Borehole Drilling, Sampling, and Characterization for the Proposed Natural Gas Pipeline from Pasco, Washington to the Hanford Site 200 East Area CX(s) Applied: B3.1 Date: 04/03/2013 Location(s): Washington

332

Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Revision 1  

Science Conference Proceedings (OSTI)

This report describes environmental monitoring activities at Hanford Reservation. Attention is focused on effluent monitoring and environmental surveillance. All Hanford contractors reviewed potential sources of contamination. A facility effluent monitoring plan was written for each facility with the potential to release significant quantities of hazardous materials, addressing both radiological and nonradiological effluent monitoring. The environmental surveillance program assesses onsite and offsite environmental impacts and offsite human health exposures. The program monitors air, surface water, sediment, agricultural products, vegetation, soil, and wildlife. In addition, independent onsite surveillance is conducted to evaluate the effectiveness of Hanford Site effluent controls in order to comply with applicable environmental standards and regulations.

Not Available

1994-11-09T23:59:59.000Z

333

Pacific Northwest Laboratory annual report for 1982 to the DOE Office of the Assistant Secretary for Environmental Protection, Safety and Emergency Preparedness. Part 5. Environmental and occupational protection, assessment, and engineering  

Science Conference Proceedings (OSTI)

Part 5 of the 1982 Annual Report to the Department of Energy's Office of Environmental Protection, Safety and Emergency Preparedness presents Pacific Northwest Laboratory's progress on work performed for the Office of Environmental Programs, Office of Operational Safety, and the Office of Nuclear Safety. The report is in three sections, introduced by blue divider pages, corresponding to the program elements: Technology Impacts, Environmental and Safety Engineering, Operational and Environmental Safety. In each section, articles describe progress made during FY 1982 on individual projects, as identified by the Field Task Proposal/Agreement. Authors of these articles represent a broad spectrum of capabilities derived from various segments of the Laboratory, reflecting the interdisciplinary nature of the work.

Bair, W.J.

1983-02-01T23:59:59.000Z

334

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 15, 2013 January 15, 2013 EA-1949: FERC Draft Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA December 27, 2012 EM's Office of River Protection has successfully removed waste from a tenth storage tank at the Hanford site. Located in C Farm, C-109 is one of 16 underground tanks ranging in capacity from 55,000 to 530,000 gallons. Retrieval of Tenth Single-shell Tank Complete at Hanford's Office of River Protection RICHLAND, Wash. - The Office of River Protection (ORP) has completed retrieval of radioactive and chemical waste from the tenth underground waste storage tank at the Hanford site. December 17, 2012 CX-009746: Categorical Exclusion Determination Upstream Ultrasonic Processing for Small Producers: Preventative Maintenance for Paraffin Management

335

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 12, 2003 February 12, 2003 EIS-0286: Notice of Intent Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement, Richland, WA February 12, 2003 EIS-0285-SA-121: Supplement Analysis Transmission System Vegetation Management Program February 10, 2003 EIS-0285-SA-120: Supplement Analysis Transmission System Vegetation Management Program, Benton County, Washington January 31, 2003 EIS-0325: EPA Notice of Availability of the Final Environmental Impact Statement Schultz-Hanford Transmission Line Project January 29, 2003 EIS-0285-SA-119: Supplement Analysis Transmission System Vegetation Management Program, Snohomish-Murray No. 1 Transmission Line January 27, 2003 EIS-0285-SA-118: Supplement Analysis Transmission System Vegetation Management Program, Holcomb-Naselle 115kV,

336

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 5, 2002 September 5, 2002 EIS-0285-SA-107: Supplement Analysis Transmission System Vegetation Management Program September 2, 2002 EIS-0169-SA-05: Supplement Analysis Yakima/Klickitat Fisheries Project, Cle Elum, Kittitas County, Washington August 30, 2002 EIS-0332: Final Environmental Impact Statement McNary-John Day Transmission Line Project August 29, 2002 EIS-0285-SA-99: Supplement Analysis Transmission System Vegetation Management Program Final Environmental Impact Statement - Olympia-Grand Coulee No.1 August 22, 2002 EIS-0285-SA-105: Supplement Analysis Transmission System Vegetation Management Program August 21, 2002 EIS-0285-SA-104: Supplement Analysis Transmission System Vegetation Management Program August 1, 2002 EIS-0344: Draft Envrionmental Impact Statement

337

EIS-0286: Revised Draft Environmental Import Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Revised Draft Environmental Import Statement 6: Revised Draft Environmental Import Statement EIS-0286: Revised Draft Environmental Import Statement Richland Operations Office, Hanford Site Solid (Radioactive and Hazardous) Waste Program, Richland, Washington The revised draft of the Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement (HSW EIS) provides environmental and technical information concerning U.S. Department of Energy (DOE) proposed waste management practices at the Hanford Site. DOE/EIS-0286, Richland Operations Office, Revised Draft Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement, Richland, Washington - Summary (March 2003) EIS-0286-D2-DEIS-01-2003.pdf EIS-0286-D2-DEIS-02-2003_0.pdf More Documents & Publications

338

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 30, 2013 July 30, 2013 Matt McCormick, manager of the Richland Operations Office, commends a large group of Hanford workers for the 15-million-ton milestone at a public event at the Environmental Restoration Disposal Facility. Disposal Facility Reaches 15-Million-Ton Milestone RICHLAND, Wash. - EM's Environmental Restoration Disposal Facility (ERDF) - a massive landfill for low-level radioactive and hazardous waste at the Hanford site - has achieved a major cleanup milestone. July 30, 2013 Energy Secretary Ernest Moniz tours the 200 West Pump and Treat System, which treats chemical and radionuclide contamination in Hanford's groundwater. Pictured, left to right, are Special Assistant to the Secretary Mark Appleton, Bob Popielarczyk of CH2M HILL Plateau Remediation Company, Special Assistant to the Secretary T.J. Augustine, Secretary Ernest Moniz, EM Senior Advisor Dave Huizenga and DOE Richland Operations Office Deputy Manager Doug Shoop.

339

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 22, 2012 June 22, 2012 CX-008692: Categorical Exclusion Determination Amendment Number 2 to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 06/22/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration June 21, 2012 CX-008695: Categorical Exclusion Determination Munro Control Center Expansion CX(s) Applied: B1.15 Date: 06/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 20, 2012 CX-008694: Categorical Exclusion Determination Acquisition and Disposition of Property CX(s) Applied: B1.24 Date: 06/20/2012 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration June 20, 2012 CX-008693: Categorical Exclusion Determination Wood Pole Structure Replacements on the Chehalis-Centralia No. 2 115 Kilovolt Transmission Line

340

DOE/EA-1444: Environmental Assessment for the Construction of New Office Building, Child-Care Facility, Parking Garage, And Storm Water Retention Pond (September 2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 ENVIRONMENTAL ASSESSMENT For the Construction of New Office Building, Child-Care Facility, Parking Garage, And Storm Water Retention Pond United States Department of Energy National Energy Technology Laboratory September 2002 DOE/EA-1444 ENVIRONMENTAL ASSESSMENT For the Construction of New Office Building, Child-Care Facility, Parking Garage, And Storm Water Retention Pond United States Department of Energy National Energy Technology Laboratory September 2002 National Environmental Policy Act (NEPA) Compliance Cover Sheet Proposed Action: The U.S. Department of Energy (DOE) proposes to upgrade facilities and infrastructure at the National Energy Technology Laboratory (NETL), Morgantown, WV, through acquisition of a 5-acre

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 28, 1995 September 28, 1995 EA-0981: Final Environmental Assessment Solid Waste Retrieval Complex, Enhanced Radioactive and Mixed Waste Storage Facility, Infrastructure Upgrades, and Central Waste Support Complex, Hanford Site, Richland, Washington September 22, 1995 EA-1092: Final Environmental Assessment Decontamination and Dismantlement September 8, 1995 EA-1097: Final Environmental Assessment Solid waste Disposal - Nevada Test Site, Nye County, Nevada September 8, 1995 EA-1107: Final Environmental Assessment Construction and Operation of a Office Building at the Stanford Linear Accelerator Center September 8, 1995 EA-1087: Final Environmental Assessment Proposed Induction Linac System Experiments in Building 51B at Lawrence Berkeley National Laboratory, Berkeley, California

342

Final Environmental Impact Statement Safe Interim Storage Of Hanford Tank Wastes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1995/01eis0212_cl.html[6/27/2011 1:02:59 PM] 1995/01eis0212_cl.html[6/27/2011 1:02:59 PM] Final Environmental Impact Statement Safe Interim Storage Of Hanford Tank Wastes DOE/EIS-0212 VOLUME 1 OF 2 VOLUME 1 FINAL ENVIRONMENTAL IMPACT STATEMENT SAFE INTERIM STORAGE OF HANFORD TANK WASTES Hanford Site Richland, Washington October, 1995 WASHINGTON STATE DEPARTMENT OF ECOLOGY NUCLEAR WASTE PROGRAM LACEY, WASHINGTON 98503 U.S. DEPARTMENT OF ENERGY RICHLAND OPERATIONS OFFICE

343

Office of Information Resources  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Bureau of Investigations Billing System Federal Bureau of Investigations Billing System Bureau: Department of Energy Project Unique ID: 01 9-10-01 -22-02-3028-00 Date: 02/08/2008 A. CONTACT INFORMATION 1) Who is the person completing this document? Joanne Csordas (HS-1.21), Office of Business Operations, Office of Resource Management, Office of Health, Safety and Security, U.S. Department of Energy, HS-1.21, 1000 Independence Avenue, SW, Washington D.C. 20585, (301) 903-3573 2) Who is the system owner? Joanne Csordas (HS-1.21), Office of Business Operations, Office of Resource Management, Office of Health, Safety and Security, U.S. Department of Energy, HS-1.21, 1000 Independence Avenue, SW, Washington D.C. 20585, (301) 903-3573 3) Who is the system manager for this system or application?

344

Independent Activity Report, Washington River Protection Solutions, LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solutions, Solutions, LLC - October 2011 Independent Activity Report, Washington River Protection Solutions, LLC - October 2011 October 2011 Industrial Hygiene Surveillance of the Washington River Protection Solutions, LLC Industrial Hygiene Program Strategy and Implementation of the Hanford Concerns Council Recommendations [HIAR-ORP-2011-10-26] Staff from the U.S. Department of Energy's (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), in coordination with the Office of River Protection (ORP), reviewed the status and programmatic health of the Washington River Protection Solutions, LLC (WRPS) industrial hygiene program relative to the Hanford Concerns Council (HCC) Independent Review Panel (IRP) report on Chemical Vapors Industrial

345

Environmental planning in Florida: Floridas environmental screening tool: laying the technology foundation for efficient transportation decision making  

E-Print Network (OSTI)

of Transportation. Environmental Management Office, Interimof Transportation, Environmental Management Office, with

Roaza, Ruth

2003-01-01T23:59:59.000Z

346

Pacific Northwest Site Office P.O. BOX 350, Kg-42  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pacific Northwest Site Office Pacific Northwest Site Office P.O. BOX 350, Kg-42 Richland, Washington 99352 JAN 1 8 2019 MEMORANDUM FOR SCOTT B. HARRIS, GENERAL COUNSEL OFFICE OF GENERAL COUNSEL FROM: SUBJECT: GC- I , HQ JULIE K. ERlCKSON PACIFIC NORTHWEST SITE OFFICE 20 1 1 ANNUAL NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) PLANNING SUMMARY DOE 0 45 1.1B requires Secretarial Officers and Heads of Field Organizations to submit a Annual NEPA Planning Summary to the Office of General Counsel. We have consulted your December 8,201 0, memorandum, and guidance posted on the Office of NEPA Policy and Compliailce (GC-54) web site, and have no NEPA activities to report. If you have any questions, please contact me, or your staff may contact Theresa Aldridge, Operations Division, at (509) 372-4508, or Peter Siebach, Integrated Support Center - Chicago

347

EIS-0203F; DOE Programmatic Spent Nuclear Fuel Management and INEL Environmental Restoration and Waste Management Programs Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary-1995.html[6/27/2011 12:08:32 PM] Summary-1995.html[6/27/2011 12:08:32 PM] SUMMARY DOE/EIS-0203-F Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement Summary April 1995 U.S. Department of Energy Office of Environmental Management Idaho Operations Office Department of Energy Washington, DC 20585 April 1995 Dear Citizen: This is a summary of the Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement. The Department of Energy and

348

MISSION ENVIRONMENTAL OFFICER HANDBOOK and Guide to Life-of-Project Environmental Compliance for all USAID Staff  

E-Print Network (OSTI)

Contract Number EPP-I-00-03-00013-00, Task Order No. 11. The contents of this publication are the sole responsibility of IRG and do not necessarily reflect the views of USAID or the United States Government. NOTE: The terminology used in this Handbook is consistent with the ADS. While terms such as, strategic objective and strategic objective team may no longer be in use, we use these terms herein pending update of ADS 204 and other USAID guidance. About this Handbook Dear MEO, The purpose of this Handbook is to provide you with guidance and the resources you need to be as effective as possible in helping your Mission attain and maintain full compliance with USAIDs Environmental Procedures and to mainstream environmentally sound design and management (ESDM). We know that your MEO role is just one of several important and competing responsibilities, and we hope that this Handbook makes your MEO role more fulfilling and easier. This Handbook provides you with: A basic orientation to USAIDs Environmental Procedures and the MEO position. Recommendations for coordinating with other USAID staff and partners. An orientation to, and recommendations for, implementing the MEOs core role: ensuring that

unknown authors

2009-01-01T23:59:59.000Z

349

EXECUTIVE OFFICE OF THE PRESIDENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EXECUTIVE OFFICE OF THE PRESIDENT COUNCIL ON ENVIRONMENTAL QUALITY 722 JACKSON PLACE, N. W. WASHINGTON, D. C. April 30, 1981 MEMORANDUM FOR GENERAL COUNSELS, NEPA LIAISONS AND PARTICIPANTS IN SCOPING SUBJECT: Scoping Guidance As part of its continuing oversight of the implementation of the NEPA regulations, the Council on Environmental Quality has been investigating agency experience with scoping. This is the process by which the scope of the issues and alternatives to be examined in an EIS is determined. In a project led by Barbara Bramble of the General Counsel's staff the Council asked federal agencies to report their scoping experiences; Council staff held meetings and workshops in all regions of the country to discuss scoping practice; and a contract study was performed for the Council to investigate what techniques work best for

350

Categorical Exclusion Determinations: Office of Energy Efficiency...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Government Buildings CX(s) Applied: B3.6, B5.1 Date: 11062009 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy November 6, 2009 CX-000043: Categorical...

351

DOE Programs Designate Technical Information Officers for DOE...  

Office of Scientific and Technical Information (OSTI)

TIOs: Advanced Research Projects - Energy (AR), Office of Energy Efficiency and Renewable Energy (EE), Office of Environmental Management (EM), Office of Fossil Energy (FE), Office...

352

U.S. GOVERNMENT PRINTING OFFICE WASHINGTON  

E-Print Network (OSTI)

Nuclear Security Adminis- tration (NNSA). In addition, the Subcommittee will examine the status of inter in June. NIF's construction was supported entirely by DOE's National Nuclear Security Administration (NNSA- tion for a significant inertial fusion energy program. At this time, however, neither NNSA nor FES, nor

353

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 19, 2013 June 19, 2013 A Hanford site volunteer helps a Boy Scout practice the Pull, Aim, Squeeze, Sweep, or PASS, fire extinguishing technique at the Volpentest HAMMER Training & Education Center in Richland. Local Scouts Train with Hanford Safety Experts - 52 Boy Scouts Earn Merit Badges at the HAMMER Training Facility RICHLAND, Wash. - Hanford site services contractor Mission Support Alliance (MSA) hosted a unique opportunity for 52 local Boy Scouts at the Volpentest HAMMER Training & Education Center during two consecutive weekends recently. June 14, 2013 EA-1562-SA-1: Supplement Analysis Final Environmental Assessment of Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington June 4, 2013

354

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18, 2011 18, 2011 Hanford to Host ISMS Safety Workshop in Kennewick: Abstracts Due in June for September Event RICHLAND, WASH. - The U.S. Department of Energy (DOE) at Hanford will hold its annual DOE Integrated Safety Management (ISM) Champions Workshop on September 12-15, 2011, at the Three Rivers Convention Center in Kennewick, Wash. May 17, 2011 EA-1731: Final Environmental Assessment Walla Walla-Tucannon River Transmission Line Rebuild Project, Walla Walla and Columbia Counties, Washington May 17, 2011 EA-1731: Mitigation Acton Plan Walla Walla-Tucannon River Transmission Line Rebuild Project May 17, 2011 EA-1731: Finding of No Significant Impact Walla Walla-Tucannon River Transmission Line Rebuild Project May 13, 2011 CX-005809: Categorical Exclusion Determination

355

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 16, 2004 January 16, 2004 EIS-0246-SA-37: Supplement Analysis Wildlife Mitigation Program, On the Spokane Indian Reservation, near Wellpinit, Stevens County, Washington November 10, 2003 EIS-0349: Record of Decision Electrical Interconnection of the BP Cherry Point Cogeneration Project October 2, 2003 EA-0307-SA-01: Supplement Analysis Colville Resident Trout Hatchery Project Supplement Analysis September 5, 2003 EIS-0349: Draft Environmental Impact Statement BP Cherry Point Cogeneration Project July 21, 2003 EIS-0317: Record of Decision Kangley-Echo Lake Transmission Line Project July 14, 2003 EIS-1069-SA-07: Supplement Analysis Yakima/Kilickitat Fisheries Project, Noxious Weed Control at Cle Elum and Jack Creek, Cle Elum Supplementation and Research Facility and Jack Creek

356

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 13, 2012 July 13, 2012 First of Hanford's Highly Radioactive Sludge Moved Away from River RICHLAND, Wash. - Workers have started moving highly radioactive material, called sludge, awayfrom the Columbia River, marking a significant milestone in the U. S. Department of Energy (DOE)'s cleanup of the Hanford Site in Washington State. July 9, 2012 EA-1912: Draft Environmental Assessment Midway-Benton No. 1 Rebuild Project Benton County, WA July 3, 2012 EIS-0312: Record of Decision (2012) Bonneville Power Administration Administrator's Record of Decision: Columbia Basin Fish Accords Memorandum of Agreement (MOA) with the Kalispel Tribe July 3, 2012 DOE Announces Additional Tour Seats Available: Tours of B Reactor at the Hanford Site Begin and End in Richland, Wash. RICHLAND, Wash. - The U.S. Department of Energy (DOE) has made additional

357

Find Funding | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Find Funding Find Funding Funding Opportunities Grants & Contracts Support Award Search Find Funding Early Career Research Program Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 Find Funding Print Text Size: A A A RSS Feeds FeedbackShare Page Additional information on funding opportunities, including program contacts and general program announcements can be found on the SC program offices' funding opportunities pages: Advanced Scientific Research Computing (ASCR) funding opportunities information Basic Energy Sciences (BES) funding opportunities information Biological & Environmental Research (BER) funding opportunities information Fusion Energy Sciences (FES) funding opportunities information

358

Idaho's Radiological and Environmental Sciences Laboratory , OAS-L-12-02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho's Radiological and Idaho's Radiological and Environmental Sciences Laboratory OAS-L-12-02 February 2012 Department of Energy Washington, DC 20585 February 21, 2012 MEMORANDUM FOR THE MANAGER, IDAHO OPERATIONS OFFICE FROM: Daniel M. Weeber, Director Eastern Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Idaho's Radiological and Environmental Sciences Laboratory" BACKGROUND The Department of Energy owns and operates the Radiological and Environmental Sciences Laboratory (RESL) through the Idaho Operations Office (Idaho). RESL is a reference measurements laboratory specializing in analytical chemistry, radiation measurements and calibrations, and quality assurance. RESL had been located at the Idaho National Laboratory

359

Efficiency Projects for Office and Education Buildings Integrating Indoor Environmental Quality with Energy Efficiency  

E-Print Network (OSTI)

Purpose and Scope of this Report Many building owners and managers are under increased pressure from many circles to provide good indoor environmental quality (IEQ). There are many opportunities to advance IEQ during the course of energy projects without sacrificing energy efficiency. These opportunities

Integrating Indoor; Environmental Quality; Office Of Radiation; Indoor Air

2000-01-01T23:59:59.000Z

360

Washington National Records Center  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington National Records Center Washington D.C. 20404 Annette Black, IM-23, 301-903-3842 Annette.Black@hq.doe.gov John E. Davenport, Director Records Management Div. IM23270CC...

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

DRAFT ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 FINAL ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE TO RECORD HILL WIND LLC FOR CONSTRUCTION OF A WIND ENERGY PROJECT IN ROXBURY, MAINE U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 July 2011 DOE/EA-1824 i EXECUTIVE SUMMARY INTRODUCTION The U.S. Department of Energy (DOE) is proposing to issue a loan guarantee to Record Hill Wind LLC (Record Hill) for the construction of a 50.6 megawatt (MW) wind energy project located in Roxbury, Maine. 1 DOE has prepared this Final Environmental Assessment (EA) in compliance with the National Environmental Policy Act (NEPA) (42 United States Code [USC] 4321, et. seq.) Council on Environmental Quality regulations for implementing NEPA (40 Code of Federal Regulations

362

The Office of Industrial Technologies - enhancing the competitiveness, efficiency, and environmental quality of American industry through technology partnerships  

Science Conference Proceedings (OSTI)

A critical component of the Federal Government`s effort to stimulate improved industrial energy efficiency is the DOE`s Office of Industrial Technologies (OIT). OIT funds research, development, and demonstration (RD&D) efforts and transfers the resulting technology and knowledge to industry. This document describes OIT`s program, including the new Industries of the Future (IOF) initiative and the strategic activities that are part of the IOF process. It also describes the energy, economic, and environmental characteristics of the materials and process industries that consume nearly 80% of all energy used by manufacturing in the United States. OIT-supported RD&D activities relating to these industries are described, and quantitative estimates of the potential benefits of many OIT-supported technologies for industry are also provided.

NONE

1997-09-01T23:59:59.000Z

363

Report: Removal of EM Projects from the GAO High Risk List: Strategies for Improving the Effectiveness of Project and Contract Management in the Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPORT TO THE REPORT TO THE ENVIRONMENTAL MANAGEMENT ADVISORY BOARD Removal of EM Projects from the GAO High Risk List: Strategies for Improving the Effectiveness of Project and Contract Management in the Office of Environmental Management Submitted by the EMAB Acquisition and Project Management Subcommittee December 5, 2011 Introduction: This report provides a comprehensive summary of the work performed by the Acquisition and Project Management Subcommittee (APMS) of the Environmental Management Advisory Board, since tasking in March 2010. In particular, this report includes the summary observations developed and recommendations previously approved by the EMAB on the Subcommittee's work and presented to the then Assistant Secretary of Environmental Management (EM). As the

364

News From the D.C. Office: Seminars Explore Energy Policies & Technologies  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Aerial view of Washington D.C. 3 Aerial view of Washington D.C. News From the D.C. Office Seminars Explore Energy Policies & Technologies As part of our effort to communicate with customers and colleagues in the Washington area, the LBNL-D.C. office sponsors a series of breakfast seminars on research and policy topics of current interest. We've held six seminars this spring, each attended by 15 to 25 invited guests from the Department of Energy, the Environmental Protection Agency, the Agency for International Development, nongovernmental organizations, Congressional committee staff, and D.C. staff of other national laboratories. On March 2, Jim McMahon of LBNL's Energy Analysis Program described LBNL's important contribution to national energy-efficiency standards for appliances. LBNL has provided analytical support to DOE for more than 15

365

Pacific Northwest Laboratory annual report for 1981 to the DOE Office of the Assistant Secretary for Environmental Protection, Safety and Emergency Preparedness. Part 5. Environmental and occupational protection, assessment, and engineering  

DOE Green Energy (OSTI)

This report describes research in environment, health, and safety conducted during fiscal year 1981. The five parts of the report are oriented to particular segments of the program. Parts 1 to 4 report on research performed for the DOE Office of Health and Environmental Research in the Office of Energy Research. Part 5 reports progress on all research performed for the Office of the Assistant Secretary for Environmental Protection, Safety and Emergency Preparedness. The parts are: Part 1: Biomedical Sciences under Program Manager, H. Drucker; Part 2: Ecological Sciences, under Program Manager, B.E. Vaughan; Part 3: Atmospheric Sciences under Program Manager, C.E. Elderkin; Part 4: Physical Sciences under Program Manager, J.M. Nielsen; and Part 5: Environmental and Occupational Protection, Assessment, and Engineering under Program Managers, D.L. Hessel, S. Marks, and W.A. Glass.

Glass, W.A.

1982-02-01T23:59:59.000Z

366

Vision Office Products  

NLE Websites -- All DOE Office Websites (Extended Search)

(CF) November 2000 C. N. Long Work supported by the U.S. Department of Energy, Office of Energy Research, Office of Health and Environmental Research Long, November 2000, ARM...

367

Field Offices | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Field Offices Field Offices About Organization Budget Field Offices Federal Advisory Committees History Scientific and Technical Information Honors & Awards Jobs Brochures, Logos, & Information Resources Contact Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 Field Offices Print Text Size: A A A RSS Feeds FeedbackShare Page The Office of Science is accountable for the effective stewardship and management of ten world class laboratories, and employs a performance based management and operating contract model to achieve these objectives. Each Office of Science Site Office oversees the operation of their respective laboratory: Ames Site Office (AMSO) Argonne Site Office (ASO) Berkeley Site Office (BSO)

368

Preliminary Notice of Violation, Washington Group International -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Group International - Group International - EA-2003-07 Preliminary Notice of Violation, Washington Group International - EA-2003-07 October 23, 2003 Preliminary Notice of Violation issued to Washington Group International related to Falsification of Records and Procurement Deficiencies at the Advanced Mixed Waste Treatment Project at the Idaho National Engineering and Environmental Laboratory This letter refers to the investigation conducted by the Department of Energy (DOE) into allegations that RTS Wright Industries, LLC, (RTS), a supplier for which Washington Group International (WGI) had direct contractual responsibility, had falsified quality control inspection records. These records pertained to the Advanced Mixed Waste Treatment Project (AMWTP) Supercompactor Glovebox Suite at the Idaho

369

HYDROGEOLOGY 2009 EPA WIPP RECERTIFICATION FACT SHEET United States Environmental Protection Agency | Office of Air and Radiation (6608J) | June 2009  

E-Print Network (OSTI)

HYDROGEOLOGY 2009 EPA WIPP RECERTIFICATION FACT SHEET United States Environmental Protection Agency | Office of Air and Radiation (6608J) | June 2009 http://www.epa.gov/radiation/wipp/index.html HYDROGEOLOGY as hydrogeology. WIPP hydrogeology Hydrogeologic studies for WIPP have been conducted to understand the rates

370

PERFORMANCE ASSESSMENT 2009 EPA WIPP RECERTIFICATION FACT SHEET United States Environmental Protection Agency | Office of Air and Radiation (6608J) | June 2009  

E-Print Network (OSTI)

PERFORMANCE ASSESSMENT 2009 EPA WIPP RECERTIFICATION FACT SHEET United States Environmental Protection Agency | Office of Air and Radiation (6608J) | June 2009 http://www.epa.gov/radiation/wipp the Waste Isolation Pilot Plant (WIPP) to the accessible environment over a 10,000-year period. The WIPP PA

371

MAGNESIUM OXIDE AN ENGINEERED BARRIER 2009 EPA WIPP RECERTIFICATION FACT SHEET United States Environmental Protection Agency | Office of Air and Radiation (6608J) | June 2009  

E-Print Network (OSTI)

MAGNESIUM OXIDE ­ AN ENGINEERED BARRIER 2009 EPA WIPP RECERTIFICATION FACT SHEET United States Environmental Protection Agency | Office of Air and Radiation (6608J) | June 2009 http://www.epa.gov/radiation/wipp/index.html MAGNESIUM OXIDE ­ AN ENGINEERED BARRIER Why is MgO Used At WIPP? The U.S. Department of Energy (DOE

372

United States Environmental Protection Agency | Office of Air and Radiation (6608J) | EPA 402-F-05-028 | October 2005 www.epa.gov/radiation/yucca  

E-Print Network (OSTI)

United States Environmental Protection Agency | Office of Air and Radiation (6608J) | EPA 402-F-05-028 | October 2005 www.epa.gov/radiation/yucca EPA Yucca Mountain Fact Sheet #4: Agency Roles in the Approval agencies involved in the approval and potential construction of the facility. National Academy of Sciences

373

FY 1991 environmental research programs for the Nevada Operations Office: Work plan and quarterly reports, first and second quarter reports  

SciTech Connect

The work carried out on behalf of the DOE by the Desert Research Institute (DRI) includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies, site mitigation plans, compliance activities, and historical research; offsite community radiation monitoring support; environmental compliance activities related to stat and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design, laboratory, field, and administrative activities. In addition to these, archaeological site characterization, flood hazards for rail transportation, and paleofaunal investigations will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, review and classification of DRI documents, and preparation of any special reports, e.g., quarterly reports, not included in the requirements of the individual projects. A new set of programs funded by the Office of Technology Development will be in place by the third quarter of FY 1991. These projects will address environmental restoration and waste management concerns, among other related topics. This document contains the Work Plan, including project descriptions, tasks, deliverables and quarterly progress reports on each project for FY 1991.

NONE

1991-05-01T23:59:59.000Z

374

Fermi Site Office Post Office Box 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fermi Site Office Fermi Site Office Post Office Box 2000 Batavia, Illinois 60510 JAN 14 2011 Scott Blake Harris, General Counsel GC-1 FORS SUBJECT: FERMl SITE OFFICE (FSO) 201 1 ANNUAL NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) PLANNING SUIMMARY The Department of Energy (DOE) Order 451 .I B, Change 2, requires Secretarial Officers and Heads of Field Organizations to submit a NEPA Annual Planning Summary to the Office of General Counsel. Per your December 8, 2010 memorandum and guidance provided by the Office of NEPA Policy and Compliance (GC-54), our Annual NEPA Planning Summary is enclosed. We have identified one on-going environmental assessment (EA). No environmental impact statements (EISs) are on-going and two new EAs and one EIS are expected to be prepared beginning in the next 12 to 24 months.

375

US Department of Energy Nevada Operations Office annual site environmental report, 1992. Volume 1  

SciTech Connect

This report contains the environmental monitoring and assessment results for the Nevada Test Site for 1992. Monitoring and surveillance on and around the NTS by DOE contractors and Site user organizations during 1992 indicated that underground nuclear testing operations were conducted in compliance with regulations, i.e., the dose the maximally exposed offsite individual could have received was less than 0.15 percent of the guideline for air exposure. All 1992 nuclear events took place during the first three quarters of the calendar year prior to the Congressional testing moratorium. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from test operations was not detectable offsite, and no measurable net exposure to members of the offsite population was detected through the offsite dosimetry program. Using the CAP88-PC model and NTS radionuclide emissions data, the calculated maximum effective dose equivalent offsite would have been 0.012 mrem. Any person receiving this dose was also exposed to 78 mrem from natural background radiation. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped to EPA-approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act is being achieved and, where mandated, permits for air and water discharges and waste management have been obtained from the appropriate agencies. Non-NTS support facilities complied with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits.

Black, S.C.; Latham, A.R.; Townsend, Y.E. [eds.

1993-09-01T23:59:59.000Z

376

US Department of Energy Nevada Operations Office annual site environmental report: 1993. Volume 1  

SciTech Connect

Monitoring and surveillance on and around the Nevada Test Site (NTS) by DOE contractors and NTS user organizations during 1993 indicated that operations on the NTS were conducted in compliance with applicable federal and DOE guidelines, i.e., the dose the maximally exposed offsite individual could have received was less than 0.04 percent of the 10 mrem per year guide for air exposure. No nuclear tests were conducted due to the moratorium. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from diffusion, evaporation of effluents, or resuspension was not detectable offsite, and no measurable net exposure to members of the offsite population was detected through the offsite dosimetry program. Using the CAP88-PC model and NTS radionuclide emissions data, the calculated effective dose equivalent to the maximally exposed individual offsite would have been 0.004 mrem. Any person receiving this dose would also have received 97 mrem from natural background radiation. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped offsite to approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act is being achieved and, where mandated, permits for air and water discharges and waste management have been obtained from the appropriate agencies. Support facilities at off-NTS locations compiled with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits.

Black, S.C.; Glines, W.M.; Townsend, Y.E. [eds.

1994-09-01T23:59:59.000Z

377

EIS-0283DS Supplement to the Surplus Plutonium Disposition Draft Environmental Impact Statement, April 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sheet Sheet Responsible Agency: United States Department of Energy (DOE) Title: Supplement to the Surplus Plutonium Disposition Draft Environmental Impact Statement (Supplement) (DOE/EIS-0283-DS) Locations of Candidate Sites: Idaho, North Carolina, South Carolina, Texas, Virginia, and Washington Contacts: For further information on the Supplement contact: For further information on the DOE National Environmental Policy Act (NEPA) process contact: Mr. G. Bert Stevenson, NEPA Compliance Officer Office of Fissile Materials Disposition U.S. Department of Energy P.O. Box 23786 Washington, DC 20026-3786 Voice: (202) 586-5368 Ms. Carol Borgstrom, Director Office of NEPA Policy and Assistance Office of Environment, Safety and Health U.S. Department of Energy 1000 Independence Ave., SW

378

Washington County- Wind Ordinance  

Energy.gov (U.S. Department of Energy (DOE))

This ordinance establishes regulations to facilitate the installation and construction of Small Wind Energy Systems in Washington County for private landowners, subject to reasonable restrictions...

379

,"Washington Natural Gas Prices"  

U.S. Energy Information Administration (EIA) Indexed Site

Of Series","Frequency","Latest Data for" ,"Data 1","Washington Natural Gas Prices",12,"Annual",2012,"6301967" ,"Release Date:","10312013" ,"Next Release...

380

Categorical Exclusion Determinations: Office of River Protection-Richland  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 1, 2011 March 1, 2011 CX-005367: Categorical Exclusion Determination Project T-222 Hazardous Materials Management Emergency Response (HAMMER) Training Facility Water Main Extension for Fire Protection CX(s) Applied: B1.3, B1.15 Date: 03/01/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office March 1, 2011 CX-005366: Categorical Exclusion Determination Herbicide Applications Along Gravel and Paved Roads on the Hanford Site CX(s) Applied: B1.3 Date: 03/01/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office January 31, 2011 CX-005190: Categorical Exclusion Determination Project L-691, 200 West Area Sanitary Sewage Lagoon CX(s) Applied: B1.26 Date: 01/31/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Categorical Exclusion Determinations: Office of River Protection-Richland  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 22, 2011 August 22, 2011 CX-006835: Categorical Exclusion Determination 241-T Tank Farm Debris Barrier Fence CX(s) Applied: B1.11 Date: 08/22/2011 Location(s): Richland, Washington Office(s): River Protection-Richland Operations Office, Golden Field Office August 11, 2011 CX-006490: Categorical Exclusion Determination Bat Roost Tower Construction CX(s) Applied: B1.20 Date: 08/11/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 28, 2011 CX-006063: Categorical Exclusion Determination Limited Firebreak Maintenance on the Hanford Site During Calendar Year 2011 CX(s) Applied: B1.3 Date: 06/28/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006092: Categorical Exclusion Determination

382

Code Compliance Technical Meeting: Building Technologies Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Compliance Compliance Technical Meeting: Building Technologies Office Department of Energy Washington, DC APRIL 2013 1 Welcome Welcome to The Building Technologies Office's Code Compliance Technical Meeting and to Washington, DC. On behalf of the Department of Energy Building Technology Office (BTO), we would like to thank you for attending, for your participation. The goal of this meeting is to review and discuss ongoing projects and existing activities that improve compliance with model energy codes. DOE

383

STATE OF WASHINGTON DEPARTMENT OF COMMERCE 1011 Plum Street SE  

NLE Websites -- All DOE Office Websites (Extended Search)

STATE OF WASHINGTON STATE OF WASHINGTON DEPARTMENT OF COMMERCE 1011 Plum Street SE  PO Box 42525  Olympia, Washington 98504-2525  (360) 725-4000 www.commerce.wa.gov July 33, 2013 Roland J. Risser Building Technologies Program Manager Office of Energy Efficiency and Renewable Energy U.S. Department of Energy 1000 Independence Avenue SW, Mail Stop EE-2J Washington, DC 20585-0121 RE: State Certification of Residential and Commercial Building Energy Codes Dear Mr. Risser: In compliance with Title III of the Energy Conservation and Production Act (ECPA) of 1976, as amended, this is to certify that the State of Washington has adopted the 2012 Edition, Washington State Energy Code, which meets or exceeds the 2012 version of the International Energy Conservation Code (IECC) for low-rise residential

384

Strategic Petroleum Reserve Receives Prestigious Environmental Award |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Petroleum Reserve Receives Prestigious Environmental Strategic Petroleum Reserve Receives Prestigious Environmental Award Strategic Petroleum Reserve Receives Prestigious Environmental Award September 22, 2009 - 1:00pm Addthis Washington, DC - The Department of Energy's Office of Fossil Energy (FE) announced today that the Strategic Petroleum Reserve (SPR) has received the Most Valuable Pollution Prevention Project (MVP2) award from the National Pollution Prevention Roundtable for lowering potential greenhouse gas emissions. This is the first time the SPR has captured the award for its commitment to pollution prevention, focusing on innovation, measurable results, transferability, commitment, and optimization of available project resources. "This is another example of the hard work and dedication by employees at

385

Strategic Petroleum Reserve Receives Prestigious Environmental Award |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Petroleum Reserve Receives Prestigious Environmental Strategic Petroleum Reserve Receives Prestigious Environmental Award Strategic Petroleum Reserve Receives Prestigious Environmental Award September 22, 2009 - 1:00pm Addthis Washington, DC - The Department of Energy's Office of Fossil Energy (FE) announced today that the Strategic Petroleum Reserve (SPR) has received the Most Valuable Pollution Prevention Project (MVP2) award from the National Pollution Prevention Roundtable for lowering potential greenhouse gas emissions. This is the first time the SPR has captured the award for its commitment to pollution prevention, focusing on innovation, measurable results, transferability, commitment, and optimization of available project resources. "This is another example of the hard work and dedication by employees at

386

Washington Recovery Act State Memo | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington Recovery Act State Memo Washington Recovery Act State Memo Washington Recovery Act State Memo Washington State has substantial natural resources, including biomass, wind, geothermal, and hydroelectric power. The American Recovery & Reinvestment Act (ARRA)is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Washington are supporting a broad range of clean energy projects from energy efficiency and the smart grid to wind, biomass, and geothermal, as well as cleaning up the legacy of Cold War nuclear facilities at Hanford. Through these investments, Washington's businesses, non-profits, and local governments are creating quality jobs today and positioning Washington to play an important role in the new energy economy of the

387

Staff | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

About » Staff About » Staff Biological and Environmental Research (BER) BER Home About Staff Program Contacts Organization Chart .pdf file (172KB) BER Budget BER Committees of Visitors Directions Jobs Research Facilities Science Highlights Benefits of BER Funding Opportunities Biological & Environmental Research Advisory Committee (BERAC) News & Resources Contact Information Biological and Environmental Research U.S. Department of Energy SC-23/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3251 F: (301) 903-5051 E: sc.ber@science.doe.gov More Information » About Staff Print Text Size: A A A RSS Feeds FeedbackShare Page Office of Biological and Environmental Research Dr. Sharlene Weatherwax, Associate Director Climate and Environmental Sciences Division

388

The White House Office of Media Affairs For Planning Purposes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Media Affairs For Planning Purposes December 14, 2010 Environmental Leaders, Cabinet Secretaries to Participate in First White House Environmental Justice Forum WASHINGTON, D.C. - On December 15, Obama Administration officials will convene the first-ever White House Forum on Environmental Justice. Environmental leaders from across the country will attend the day-long forum featuring White House Council on Environmental Quality Chair Nancy Sutley, EPA Administrator Lisa P. Jackson, Attorney General Eric Holder, Secretary of the Interior Ken Salazar, Secretary of Labor Hilda Solis, Secretary of Health and Human Services Kathleen Sebelius, Secretary of Energy Steven Chu, and Secretary of Homeland Security Janet Napolitano. This Forum will focus on the Obama Administration's commitment to ensuring that

389

News From the D.C. Office: Efficient Office Equipment  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Aerial view of Washington D.C. 3 Aerial view of Washington D.C. News From the D.C. Office Efficient Office Equipment: Update and a Look Ahead An extended version of this article is available here. We are now well aware of the large amount of energy consumed by "plug-in loads" such as personal computers (PCs) and other office electronics. Office equipment is often cited as the fastest-growing end-use of electricity in the fastest-growing sector of demand (commercial buildings). According to Dataquest figures, world growth of PCs will average 14 to 15 percent per year through 1999. Only ten years ago, office equipment was not even part of the "map" of non-residential energy end-uses. There were virtually no data on office equipment energy use, nor an awareness of the

390

Contact | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

& Information Resources Contact Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 Contact Print...

391

Secretary of Energy Announces New Office of Electricity Delivery...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Electricity Delivery & Energy Reliability Secretary of Energy Announces New Office of Electricity Delivery & Energy Reliability June 9, 2005 - 1:45pm Addthis WASHINGTON, DC --...

392

DOE/EIS-0456 CUSHMAN HYDROELECTRIC PROJECT MASON COUNTY, WASHINGTON  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 CUSHMAN HYDROELECTRIC PROJECT MASON COUNTY, WASHINGTON (FERC PROJECT NO. 460) FINAL ENVIRONMENTAL IMPACT STATEMENT (FERC/EIS-0095F, ADOPTED AS DOE/EIS-0456) US Department of Energy OCTOBER 2010 Lead Agency: U.S. Department of Energy (DOE) Title: Final Environmental Impact Statement (FEIS) for the Cushman Hydroelectric Project, Mason County, Washington (Adopted) Contact: For additional copies or more information on this final environmental impact statement (EIS), please

393

Record of Decision for the Final Supplemental Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Management and Budget, 725 17th Street, NW., Room 10235, New Executive Office Building, Washington, DC 20503 or should be electronically mailed to the internet address...

394

State Energy Program Assurances - Washington Governor Gregoire...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

State Energy Program Assurances - Washington Governor Gregoire State Energy Program Assurances - Washington Governor Gregoire Letter from Washington Governor Gregoire providing...

395

Independent Oversight Assessment of Environmental Monitoring...  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy DOE-ID DOE Idaho Operations Office EM Office of Environmental Management ESER Environmental Surveillance, Education and Research HSS Office of Health, Safety...

396

EA-1958: Final Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE))

Future Development in Proximity to the William R. Wiley Environmental Molecular Sciences Laboratory, Pacific Northwest National Laboratory, Richland, Washington

397

Office of Survey Development and Statistical Integration  

U.S. Energy Information Administration (EIA) Indexed Site

Steve Harvey Steve Harvey April 27, 2011 | Washington, D.C. Tough Choices in U.S. EIA's Data Programs Agenda * Office of Oil, Gas, and Coal Supply Statistics * Office of Petroleum and Biofuels Statistics * Office of Electricity, Renewables, and Uranium Statistics * Office of Energy Consumption and Efficiency Statistics * Office of Survey Development and Statistical Integration 2 Presenter name, Presentation location, Presentation date Coal Data Collection Program 3 James Kendell Washington, DC, April 27, 2011 Quarterly Coal Consumption and Quality Report, Manufacturing and Transformation/Processing Coal Plants and Commercial and Institutional Coal Users EIA-3 Quarterly Coal Consumption and Quality Report - Coke Plants EIA-5 Coal Production and Preparation

398

Building organizational technical capabilities: a new approach to address the office of environmental management cleanup challenges in the 21. century  

Science Conference Proceedings (OSTI)

The United States Department of Energy (DOE), Office of Environmental Management (EM) is responsible for the nations nuclear weapons program legacy wastes cleanup. The EM cleanup efforts continue to progress, however the cleanup continues to be technologically complex, heavily regulated, long-term, and a high life cycle cost estimate (LCCE) effort. Over the past few years, the EM program has undergone several changes to accelerate its cleanup efforts with varying degrees of success. Several cleanup projects continued to experience schedule delays and cost growth. The schedule delays and cost growth have been attributed to several factors such as changes in technical scope, regulatory and safety considerations, inadequacy of acquisition approach and project management. This article will briefly review the background and schools of thought on strategic management and organizational change practiced in the United States over the last few decades to improve an organisation's competitive edge and cost performance. The article will briefly review examples such as the change at General Electric, and the recent experience obtained from the nuclear industry, namely the long-term response to the 1986 Chernobyl accident. The long-term response to Chernobyl, though not a case of organizational change, could provide some insight in the strategic management approaches used to address people issues. The article will discuss briefly EM attempts to accelerate cleanup over the past few years, and the subsequent paradigm shift. The paradigm shift targets enhancing and/or creating organizational capabilities to achieve cost savings. To improve its ability to address the 21. century environmental cleanup challenges and achieve cost savings, EM has initiated new corporate changes to develop new and enhance existing capabilities. These new and enhanced organizational capabilities include a renewed emphasis on basics, especially technical capabilities including safety, project management, acquisition management and people. The new enhanced organizational capabilities coupled with more effective communications; oversight and decision-making processes are expected to help EM meet the 21. century challenges. This article will focus on some of the initiatives to develop and enhance organizational technical capabilities. Some of these development initiatives are a part of DOE corporate actions to respond to the Defense Nuclear Facilities Safety Board (DNFSB) recommendations 93-3 and 2004-1. Other development initiatives have been tailored to meet EM specific needs for organizational capabilities such as case studies analysis and cost estimating. (authors)

Fiore, J.J.; Rizkalla, E.I. [Office of Environmental Management, The United States Dept. of Energy, Washington, D.C. (United States)

2007-07-01T23:59:59.000Z

399

U.S. Environmental Protection Agency; Environmental Impact Statements; Notice of Availability; DOE/EIS-0286: Final Hanford Site Solid Waste Program Environmental Impact Statement, Richland, Washington (2/13/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15 15 Federal Register / Vol. 69, No. 30 / Friday, February 13, 2004 / Notices ratings assigned to draft environmental impact statements (EISs) was published in FR dated April 04, 2003 (68 FR 16511). Draft EISs ERP No. D-AFS-J65397-WY Rating LO, Woodrock Project, Proposal for Timber Sale, Travel Management and Watershed Restoration, Implementation, Bighorn National Forest, Tongue Ranger District, Sheridan County, WY. Summary: EPA has lack of objections to the proposed action based on the predicted overall improvement of forest resource conditions. EPA suggests that the final EIS provide qantification sediment from erosion estimates and monitor water quality and habitat quality in streams. ERP No. D-AFS-K65265-AZ Rating LO, Bar T Bar Anderson Springs Allotment Management Plans to

400

EIS-0419: Whistling Ridge Energy Project, Skamania County, Washington |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19: Whistling Ridge Energy Project, Skamania County, 19: Whistling Ridge Energy Project, Skamania County, Washington EIS-0419: Whistling Ridge Energy Project, Skamania County, Washington Summary This EIS evaluates the environmental impacts of a proposal to allow the electrical interconnection of Whistling Ridge Energy, LLC's proposed 75-megawatt (MW) wind project in Skamania County, Washington, to the Federal Columbia River Transmission System. DOE's Bonneville Power Administration will act as the federal lead agency under NEPA and the Washington Energy Facility Site Evaluation Council will act as the state lead agency under the Washington State Environmental Policy Act. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download August 23, 2011 EIS-0419: Final Environmental Impact Statement

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Washington Profile - Energy Information Administration  

U.S. Energy Information Administration (EIA)

Washington Quick Facts. The Grand Coulee Dam on Washington's Columbia River is the largest hydroelectric power producer in the United States, with a total generating ...

402

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 31, 1996 August 31, 1996 EA-1086: Final Environmental Assessment Amendments to 10 CFR Part 835 (Revised Version - 6/98) August 7, 1996 EA-1160: Final Environmental Assessment Northeast Oregon Wildlife Mitigation Project July 30, 1996 EA-1096: Final Environmental Assessment Washington Wildlife Mitigation Projects (Programmatic) July 15, 1996 EA-1149: Final Environmental Assessment Closure of the Waste Calcining Facility (CPP-633), Idaho National Engineering Laboratory June 8, 1996 EA-0930: Final Environmental Assessment Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado June 1, 1996 EA-1068: Final Programmatic Environmental Assessment State Energy Conservation Program May 21, 1996 EA-1093: Final Environmental Assessment Surface Water Drainage System

403

Itron (Washington) | Open Energy Information  

Open Energy Info (EERE)

Itron Itron Address 601 Officers Row Place Vancouver, Washington Zip 98661 Sector Efficiency Product Manufactures/sells advanced meters and data collection systems Website http://www.itron.com/ Coordinates 45.627447°, -122.656794° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.627447,"lon":-122.656794,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

404

Inspection of Emergency Management of the Idaho Operations Office...  

NLE Websites -- All DOE Office Websites (Extended Search)

Management of the Idaho Operations Office and Idaho National Engineering and Environmental Laboratory Office of Independent Oversight and Performance Assurance Office of the...

405

2013 Annual Planning Summary for the Ames Site Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ames Site Office 2013 Annual Planning Summary for the Ames Site Office 2013 Annual Planning Summary for the Ames Site Office The ongoing and projected Environmental Assessments and...

406

2013 Annual Planning Summary for the Loan Program Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Loan Program Office 2013 Annual Planning Summary for the Loan Program Office 2013 Annual Planning Summary for the Loan Program Office The ongoing and projected Environmental...

407

2013 Annual Planning Summary for the Chicago Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chicago Office 2013 Annual Planning Summary for the Chicago Office 2013 Annual Planning Summary for the Chicago Office The ongoing and projected Environmental Assessments and...

408

2013 Annual Planning Summary for the Sandia Site Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sandia Site Office 2013 Annual Planning Summary for the Sandia Site Office 2013 Annual Planning Summary for the Sandia Site Office The ongoing and projected Environmental...

409

2013 Annual Planning Summary for the Oak Ridge Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office 2013 Annual Planning Summary for the Oak Ridge Office 2013 Annual Planning Summary for the Oak Ridge Office The ongoing and projected Environmental Assessments and...

410

2013 Annual Planning Summary for the FERMI Site Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FERMI Site Office 2013 Annual Planning Summary for the FERMI Site Office 2013 Annual Planning Summary for the FERMI Site Office The ongoing and projected Environmental Assessments...

411

2013 Annual Planning Summary for the SLAC Site Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SLAC Site Office 2013 Annual Planning Summary for the SLAC Site Office 2013 Annual Planning Summary for the SLAC Site Office The ongoing and projected Environmental Assessments and...

412

2013 Annual Planning Summary for the Berkeley Site Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Berkeley Site Office 2013 Annual Planning Summary for the Berkeley Site Office 2013 Annual Planning Summary for the Berkeley Site Office The ongoing and projected Environmental...

413

2013 Annual Planning Summary for the Carlsbad Field Office |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carlsbad Field Office 2013 Annual Planning Summary for the Carlsbad Field Office 2013 Annual Planning Summary for the Carlsbad Field Office The ongoing and projected Environmental...

414

2013 Annual Planning Summary for the Princeton Site Office |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Princeton Site Office 2013 Annual Planning Summary for the Princeton Site Office 2013 Annual Planning Summary for the Princeton Site Office The ongoing and projected Environmental...

415

2013 Annual Planning Summary for the Argonne Site Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Argonne Site Office 2013 Annual Planning Summary for the Argonne Site Office 2013 Annual Planning Summary for the Argonne Site Office The ongoing and projected Environmental...

416

EM Announces New Director of Office of External Affairs | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Announces New Director of Office of External Affairs EM Announces New Director of Office of External Affairs May 7, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM has announced...

417

Summary Final Long-Term Management and Storage of Elemental Mercury Supplemental Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement Environmental Impact Statement Final LONG-TERM MANAGEMENT AND STORAGE OF ELEMENTAL MERCURY Final Supplemental Environmental Impact Statement LONG-TERM MANAGEMENT AND STORAGE OF ELEMENTAL MERCURY DOE/EIS-0423-S1 September 2013 SUMMARY AND GUIDE FOR STAKEHOLDERS U.S. Department of Energy Office of Environmental Management Washington, DC AVAILABILITY OF THIS FINAL LONG-TERM MANAGEMENT AND STORAGE OF ELEMENTAL MERCURY SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT For additional information on this Mercury Storage SEIS, contact: David Levenstein, Document Manager Office of Environmental Compliance (EM-11) U.S. Department of Energy Post Office Box 2612 Germantown, MD 20874 Website: http://www.mercurystorageeis.com Printed with soy ink on recycled paper FINAL LONG-TERM MANAGEMENT AND

418

Preliminary Notice of Violation, URS-Washington Division - WEA-201101 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

URS-Washington Division - URS-Washington Division - WEA-201101 Preliminary Notice of Violation, URS-Washington Division - WEA-201101 October 3, 2011 Preliminary Notice of Violation issued to URS-Washington Division related to a Hoisting Incident that occurred at the Sodium Bearing Waste Treatment Project at the Idaho National Laboratory This letter refers to the Office of Health, Safety and Security's Office of Enforcement and Oversight investigation into the facts and circumstances associated with the October 4, 2010, hoisting incident that occurred when a telescopic hydraulic gantry system (THGS) tipped while lifting a 7,800-pound shield plug at the Sodium Bearing Waste Treatment Project (SBWTP) located at the U.S. Department of Energy (DOE) Idaho National Laboratory. The noncompliances associated with this event were reported

419

Preliminary Notice of Violation, Washington Closure Hanford, LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington Closure Hanford, LLC - Washington Closure Hanford, LLC - WEA-2010-02 Preliminary Notice of Violation, Washington Closure Hanford, LLC - WEA-2010-02 August 19, 2010 Preliminary Notice of Violation issued to Washington Closure Hanford, LLC related an Employee Fall at the High Bay Testing Facility (336 Building) at the Hanford Site This letter refers to the Office of Health, Safety and Security's Office of Enforcement investigation into the facts and circumstances surrounding the employee fall that occurred at the Hanford High Bay Testing Facility (336 Building) on July 1, 2009. The worker sustained serious injury to his back and broke bones in both legs. Based on an evaluation of the evidence in this matter, the U.S. Department of Energy (DOE) has concluded that violations of 10 C.F.R. Part 851, Worker Safety and Health Program, by

420

Clean Cities: Greater Washington Region Clean Cities coalition  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Washington Region Clean Cities Coalition Washington Region Clean Cities Coalition The Greater Washington Region Clean Cities coalition works with vehicle fleets, fuel providers, community leaders, and other stakeholders to reduce petroleum use in transportation. Greater Washington Region Clean Cities coalition Contact Information Ron Flowers 202-671-1580 ronflowers@gwrccc.org Coalition Website Clean Cities Coordinator Ron Flowers Photo of Ron Flowers Ronald S. "Ron" Flowers, now retired, most recently served as the Director of the Office of Labor-Management Programs (OLMP), under the Executive Office of the Mayor of the District of Columbia (DC) Government. Flowers' senior management experience spans more than 35 years in the public and private sectors, and includes serving as the Fleet Administrator for the DC

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Department of Energy - Washington  

422

Washington Gasoline Price Data  

NLE Websites -- All DOE Office Websites (Extended Search)

Washington Exit Fueleconomy.gov The links below are to pages that are not part of the fueleconomy.gov. We offer these external links for your convenience in accessing additional...

423

Geothermal Technologies Program: Washington  

DOE Green Energy (OSTI)

This fact sheets provides a summary of geothermal potential, issues, and current development in Washington State. This fact sheet was developed as part of DOE's GeoPowering the West initiative, part of the Geothermal Technologies Program.

Not Available

2005-02-01T23:59:59.000Z

424

EA-1931: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Assessment EA-1931: Draft Environmental Assessment Keeler to Tillamook Transmission Line Rebuild, Washington and Tillamook Counties, Oregon Bonneville Power...

425

Energy Office Grant Helps the Virgin Islands Environmental Resource Station Install Solar Panels, Improve Efficiency, and Cut Monthly Energy Use Nearly 30% (Fact Sheet), Energy Development in Island Nations, U.S. Virgin Islands (EDIN)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office Grant Helps the Virgin Islands Environmental Office Grant Helps the Virgin Islands Environmental Resource Station Install Solar Panels, Improve Efficiency, and Cut Monthly Energy Use Nearly 30% Organization Virgin Islands Energy Office www.vienergy.org Industry/Sector Government/Nonprofit Deployment Location St. John, U.S. Virgin Islands This project is such a great learning tool, and I am excited about its progress and being able to show students visiting either VIERS or our website the impact of solar energy. -Randy Brown VIERS Administrator The Virgin Islands Environmental Resource Station developed a solar classroom to educate young people in the U.S. Virgin Islands about renewable energy technologies and their energy and environmental impacts. Photo from Don Buchanan, Virgin Islands Energy Office,

426

Directions | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Directions Directions Biological and Environmental Research (BER) BER Home About Staff Organization Chart .pdf file (172KB) BER Budget BER Committees of Visitors Directions Jobs Research Facilities Science Highlights Benefits of BER Funding Opportunities Biological & Environmental Research Advisory Committee (BERAC) News & Resources Contact Information Biological and Environmental Research U.S. Department of Energy SC-23/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3251 F: (301) 903-5051 E: sc.ber@science.doe.gov More Information » About Directions Print Text Size: A A A RSS Feeds FeedbackShare Page Directions to Department of Energy, Germantown, Maryland and the Office of Biological and Environmental Research Mailing Address: SC-23/Germantown Building

427

Jobs | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Jobs Jobs Biological and Environmental Research (BER) BER Home About Staff Organization Chart .pdf file (172KB) BER Budget BER Committees of Visitors Directions Jobs Research Facilities Science Highlights Benefits of BER Funding Opportunities Biological & Environmental Research Advisory Committee (BERAC) News & Resources Contact Information Biological and Environmental Research U.S. Department of Energy SC-23/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3251 F: (301) 903-5051 E: sc.ber@science.doe.gov More Information » About Jobs Print Text Size: A A A Subscribe FeedbackShare Page Current Open Federal Positions The Office of Biological and Environmental Research is located in Germantown, Maryland. All open federal positions listed below are posted on

428

Facilities | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Facilities Facilities Biological and Environmental Research (BER) BER Home About Research Facilities DOE Joint Genome Institute (JGI) ARM Climate Research Facility Environmental Molecular Sciences Laboratory Facility Metrics Science Highlights Benefits of BER Funding Opportunities Biological & Environmental Research Advisory Committee (BERAC) News & Resources Contact Information Biological and Environmental Research U.S. Department of Energy SC-23/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3251 F: (301) 903-5051 E: sc.ber@science.doe.gov More Information » Facilities Print Text Size: A A A RSS Feeds FeedbackShare Page BER User Facilities DOE designs, develops, builds, and operates unique, world-class facilities for the benefit of the entire research community. DOE Office of Science

429

Office of Sustainability Support - Mission and Functions  

NLE Websites -- All DOE Office Websites (Extended Search)

Sustainability Support (HS-21) Reports to the Office of Environmental Protection, Sustainability Support & Corporate Safety Analysis Mission The Office of Sustainability Support...

430

Enforcement Letter, Washington TRU Solutions - September 8, 2006 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington TRU Solutions - September 8, 2006 Washington TRU Solutions - September 8, 2006 Enforcement Letter, Washington TRU Solutions - September 8, 2006 September 8, 2006 Enforcement Letter issued to Washington TRU Solutions, LLC related to Quality Assurance Deficiencies associated with the Super High-Efficiency Neutron Counter Non-Destructive Assay System Refurbishment at the Waste Isolation Pilot Plant The Office of Price-Anderson Enforcement (OE) has conducted a preliminary evaluation of the deficiencies described in Noncompliance Tracking System (NTS) report NTS-CBFO-WIPP-WIPP-2006-0001. Our evaluation included review of the investigation/causal analysis and discussion with you and other site personnel during an informal conference held on August 1, 2006. Enforcement Letter, Washington TRU Solutions -September 8, 2006

431

DOE Awards Task Order Modification for Support Services to Office...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Modification for Support Services to Office of Environmental Management DOE Awards Task Order Modification for Support Services to Office of Environmental Management March 11, 2013...

432

2011 Annual Planning Summary for Sandia Site Office (SSO) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sandia Site Office (SSO) 2011 Annual Planning Summary for Sandia Site Office (SSO) The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011...

433

2012 Annual Planning Summary for Sandia Site Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sandia Site Office 2012 Annual Planning Summary for Sandia Site Office The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013...

434

2011 Annual Planning Summary for Ames Site Office (Ames) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ames Site Office (Ames) 2011 Annual Planning Summary for Ames Site Office (Ames) The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011...

435

2012 Annual Planning Summary for Argonne Site Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Argonne Site Office 2012 Annual Planning Summary for Argonne Site Office The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013...

436

Environmental Assessment and Finding of No Significant Impact: Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership  

SciTech Connect

The scope of this environmental assessment (EA) is to analyze the potential consequences of the Proposed Action on human health and the environment. Accordingly, this EA contains an introduction to the site and the history of the Grand Junction Office (Chapter One), a description of the Purpose and Need for Agency Action (Chapter Two), a description of the Proposed Action and Alternatives (Chapter Three), and the description of the Affected Environment and the Environmental Consequences (Chapter Four). Resource categories addressed in this EA include geology, soils and topography, groundwater and surface water, floodplains and wetlands, land use and infrastructure, human health, ecological resources, cultural resources, air quality, noise, visual resources, solid and hazardous waste management, transportation, and socioeconomic and environmental justice.

N /A

2000-04-25T23:59:59.000Z

437

EA-0915: Waste Tank Safety Program Hanford Site, Richland, Washington  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of the proposal to resolve waste tank safety issues at the Hanford Site near the City of Richland, Washington, and to reduce the risks associated with...

438

Washington Profile - Energy Information Administration  

U.S. Energy Information Administration (EIA)

Nuclear Power Plants : ... Clean Cities Coalitions Western Washington (Seattle) ... Governor Chris Gregoire - Initiatives - Energy;

439

Energy Matters in Washington State  

E-Print Network (OSTI)

Energy Matters in Washington State Energy Matters in Washington State www.energy.wsu.edu/library/ November 2009 #12;905 Plum Street SE, Building 3 P.O. Box 43169 Olympia, Washington 98504-3169 Energy University Extension Energy Program. 905 Plum Street SE, Building 3, P.O. Box 43169, Olympia, Washington

Collins, Gary S.

440

DEPARTMENT OF I Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I I Office of ENERGY Science SLAC Site Office SLAC National Accelerator Laboratory 2575 Sand Hill Road, MS-8A Menlo Park, CA 94025 DATE: January 11, 2012 MEMORANDUM FOR: Joseph A. McBrearty Deputy Director of Field Operations Office of Science FROM: Paul Gola Site a r SLAC Site Office SUBJECT: Annual National Environmental Policy Act (NEPA) Planning Summary for 2012, SLAC National Accelerator Laboratory The purpose of this memorandum is to transmit the Annual National Environmental Policy Act (NEPA) Planning Summary for 2012 for the SLAC National Accelerator Laboratory (SLAC), in accordance with the June 1994 Secretarial Policy Statement on NEPA and Department of Energy Order 451.1B. The SLAC Site Office (SSO) has reviewed ongoing and planned activities at the site and determined, in consultation with the DOE NEPA Compliance Officer, that there is one NEPA Environmental Assessment

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

EIS-0424: Klickitat Hatchery Complex Program, Washington  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the environmental impacts from DOEs Bonneville Power Administration's proposal to assist with funding the construction, operation, and maintenance of modifications to the Klickitat Hatchery and the Yakama Nations Hatchery Complex Program that intend to aid populations of anadromous fish affected by the Federal Columbia River Power System dams. The proposed action could include support for modifications to the existing hatchery, a new hatchery/acclimation facility in Wahkiacus, Washington, and an acclimation facility at McCreedy Creek in Yakima County, Washington.

442

Environmental Assessment LEAD TEST ASSEMBLY IRRADIATION AND ANALYSIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 10 Environmental Assessment LEAD TEST ASSEMBLY IRRADIATION AND ANALYSIS WATTS BAR NUCLEAR PLANT, TENNESSEE AND HANFORD SITE, RICHLAND, WASHINGTON U. S. DEPARTMENT OF ENERGY RICHLAND OPERATIONS OFFICE COOPERATING AGENCY: TENNESSEE VALLEY AUTHORITY July 1997 ~~~~ Portions o f this dorunrat may be iIlegiile in electronic image products. Images are produced from the best available original doaxnenL DOE/EA-12 10 Environmental Assessment LEAD TEST ASSEMBLY IRRADIATION AND ANALYSIS WATTS BAR NUCLEAR PLANT, TENNESSEE AND HANFORD SITE, RICHLAND, WASHINGTON U. S. DEPARTMENT OF ENERGY RICHLAND OPERATIONS OFFICE COOPERATING AGENCY: TENNESSEE VALLEY AUTHORITY July 1997 U.S. Department of Energy ALARA ANL-W BWR CFR CEDE CEQ Ci CLWR DOE DOT EA EDE EFPD EIS FFTF

443

DOE | Office of Health, Safety and Security | Office of the Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact Statement EJ Environmental Justice ELPAT Environmental Lead Proficiency Analytical Testing Program EM Office of Environmental Restoration and Waste Management EM U.S....

444

Department of Energy Office of Science  

E-Print Network (OSTI)

Department of Energy Office of Science Washington, DC 20585 October 5, 2010 Dear Student: Congratulations! You have been selected to attend and compete in the Science and Energy Research Challenge (SERCh

445

Notices FOR FURTHER INFORMATION CONTACT: Jessica Trice, Office of Federal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

309 Federal Register 309 Federal Register / Vol. 78, No. 36 / Friday, February 22, 2013 / Notices FOR FURTHER INFORMATION CONTACT: Jessica Trice, Office of Federal Activities, Mail Code 2252A, Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460; telephone number: (202) 564-6646; fax number: (202) 564-0072; email address: trice.jessica@epa.gov. SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail the information that the EPA will be collecting are available in the public docket for this ICR. The docket can be viewed online at www.regulations.gov or in person at the EPA Docket Center, EPA West, Room 3334, 1301 Constitution Ave., NW., Washington, DC. The telephone number for the Docket Center is 202-566-1744. For additional information about EPA's

446

Pacific Northwest Laboratory annual report for 1983 to the DOE Office of the Assistant Secretary for Environmental Protection, Safety and Emergency Preparedness. Part 5. Overview and assessment  

SciTech Connect

The 1983 annual report from Pacific Northwest Laboratory (PNL) to the Department of Energy (DOE) describes research in environment, health, and safety conducted during fiscal year 1983. The report again consists of five parts, each in a separate volume. Part 5 of the 1983 Annual Report to the Department of Energy's Assistant Secretary for Environmental Protection, Safety and Emergency Preparedness presents Pacific Northwest Laboratory's progress on work performed for the Office of Nuclear Safety and the Office of Operational Safety. For each project, as identified by the Field Task Proposal/Agreement, articles describe progress made during FY 1983. Authors of these articles represent a broad spectrum of capabilities derived from various segments of the Laboratory, reflecting the interdisciplinary nature of the work.

Bair, W.J.

1984-02-01T23:59:59.000Z

447

Categorical Exclusion Determinations: Office of River Protection-Richland  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 13, 2012 January 13, 2012 CX-007980: Categorical Exclusion Determination Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 Scheduled To Take Place CX(s) Applied: B1.22 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office January 13, 2012 CX-007979: Categorical Exclusion Determination Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 Scheduled To Take Place CX(s) Applied: B1.17 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office January 13, 2012 CX-007978: Categorical Exclusion Determination Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 CX(s) Applied: B1.16 Date: 01/13/2012 Location(s): Washington

448

Remedial actions at the former Vitro Rare Metals plant site, Canonsburg, Washington County, Pennsylvania. Final Environmental Impact Statement. Volume II. Appendices  

SciTech Connect

This report provides a summary of the conceptual design and other information necessary to understand the proposed remedial action at the expanded Canonsburg, Pennsylvania site. This design constitutes the current approach to stabilizing the radioactively contaminated materials in place in a manner that would fully protect the public health and environment. This summary is intended to provide sufficient detail for the reader to understand the proposed remedial action and the anticipated environmental impacts. The site conceptual design has been developed using available data. In some cases, elements of the design have not been developed fully and will be made final during the detailed design process.

1983-07-01T23:59:59.000Z

449

A field study of PEM (Personal Environmental Module) performance in Bank of America's San Francisco office buildings  

E-Print Network (OSTI)

for Environmental Design Research (CEDR) at UC Berkeley. TheAllen and Annette Quinn, of CEDR at UC Berkeley. REFERENCES

Bauman, Fred; Baughman, A.; Carter, G.; Arens, Edward A

1997-01-01T23:59:59.000Z

450

Categorical Exclusion Determinations: Pacific Northwest Site Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pacific Northwest Site Office Pacific Northwest Site Office Categorical Exclusion Determinations: Pacific Northwest Site Office Categorical Exclusion Determinations issued by Pacific Northwest Site Office. DOCUMENTS AVAILABLE FOR DOWNLOAD July 16, 2012 CX-009099: Categorical Exclusion Determination Routine Maintenance CX(s) Applied: B1.3, B1.4, B1.8, B1.16, B1.17 Date: 07/16/2012 Location(s): Washington Offices(s): Pacific Northwest Site Office June 28, 2012 CX-009097: Categorical Exclusion Determination U.S. Customs and Border Protection High-Energy Radiography Test Capability CX(s) Applied: B3.10, B3.11 Date: 06/28/2012 Location(s): Washington Offices(s): Pacific Northwest Site Office May 18, 2012 CX-009096: Categorical Exclusion Determination U.S. Customs and Border Protection Non-Intrusive Inspection Tests

451

A Cooperative Effort By: Office of Radiation and Indoor Air Office of Solid Waste and Emergency Response U.S. Environmental Protection Agency  

E-Print Network (OSTI)

The following two-volume report is intended solely as guidance to EPA and other environmental professionals. This document does not constitute rulemaking by the Agency, and cannot be relied on to create a substantive or procedural right enforceable by any party in litigation with the United States. EPA may take action that is at variance with the information, policies, and procedures in this document and may change them at any time without public notice. Reference herein to any specific commercial products, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government. ii FOREWORD Understanding the long-term behavior of contaminants in the subsurface is becoming increasingly more important as the nation addresses groundwater contamination. Groundwater contamination is a national concern as about 50 percent of the United States population receives its drinking water from groundwater. It is the goal of the Environmental Protection Agency (EPA) to prevent adverse effects to human health and the environment and to protect the

Review Of Geochemistry; Available K D Values

1999-01-01T23:59:59.000Z

452

Energy Edge, Post-Occupancy Evaluation Project: The Eastgate Corporate Center Bellevue, Washington  

SciTech Connect

The Workspace Satisfaction Survey measures occupant satisfaction with the thermal, lighting, acoustical, and air quality aspects of the work environment. In addition to ratings of these ambient environmental features, occupants also rate their satisfaction with a number of functional and aesthetic features of the office environment as well as their satisfaction with specific kinds of workspaces (e.g. computer rooms, the lobby, employee lounge, etc.) Each section on ambient conditions includes questions on the frequency with which people experience particular kinds of discomforts or problems, how much the discomfort bothers them, and how much it interferes with their work. Occupants are also asked to identify how they cope with discomfort or environmental problems, and to what extent these behaviors enable them to achieve more satisfactory conditions. This report documents the results of this survey of the occupants of the Eastgate Corporate Center, Bellevue, Washington. 21 figs., 7 tabs.

1990-06-01T23:59:59.000Z

453

News From the D.C. Office: Regional Builder Option Packages  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Aerial view of Washington D.C. 8 Aerial view of Washington D.C. News From the D.C. Office Regional Builder Option Packages: A Simplified Guide for Constructing Energy Star® Homes ENERGY STAR Homes is part of a family of voluntary market-transformation programs sponsored by the U.S. Environmental Protection Agency and Department of Energy. The goal of the various Energy Star programs is to help energy users save money and reduce the emission of greenhouse gases by increasing the efficiency of various energy end uses, such as appliances and office equipment. Residential energy use accounts for approximately 20% of the carbon dioxide gas emissions in the U.S., from direct fuel combustion (natural gas, oil, wood) and emissions from electricity generation. The EPA estimates that the average house is responsible for

454

DOEEA-0984 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0984 0984 Environmental Assessment Environmental Assessment for the Deactivation of the N Reactor Facilities U.S. Department of Energy Richland, Washington May 1995 \ lR4DEMARK DISCLAIMER Reference herein to any specific wmmercial product, process. M m M c e by trade name, uademark, manufacturer. or otherwise, does not necessariiy collbuNte M imply ~ f s endorsement, rewmmendation. or favoring by the Unrted States Government or any agency thereof or I u Contractors M subcontractors Ths repon has been reproduced from the best available copy Available m peper copy and microfiche Available to and contract~s from Office of Scienufic and Technical Information P O Box62 Oak hdge, TN 37831 161 51 576-8401 Available to the public from the U S Department of Commerce

455

Washington.indd  

NLE Websites -- All DOE Office Websites (Extended Search)

Washington Washington www.effi cientwindows.org March 2013 1. Meet the Energy Code and Look for the ENERGY STAR ® Windows must comply with your local energy code. Windows that are ENERGY STAR qualifi ed typically meet or exceed energy code requirements. To verify if specific window energy properties comply with the local code requirements, go to Step 2. 2. Look for Effi cient Properties on the NFRC Label The National Fenestration Rating Council (NFRC) label is needed for verifi cation of energy code compliance (www.nfrc. org). The NFRC label displays whole- window energy properties and appears on all fenestration products which are part of the ENERGY STAR program.

456

NORTH AMERICAN WATER OFFICE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NORTH AMERICAN WATER OFFICE NORTH AMERICAN WATER OFFICE P.O. Box 174 Lake Elmo, MN 55042 Phone: (612) 770-3861 Fax: (612) 770-3976 January 30, 1998 US Department of Energy Office of General Council GC-52 1000 Independence Ave. SW Washington DC 20585 RE: Preparation of Report to Congress on Price-Anderson Act Dear Office of General Council: The Price Anderson Act should be eliminated. The Price Anderson Act assumes that the encouragement and growth of the commercial nuclear industry is in the public interest. It is not. Rational evaluation of the commercial nuclear industry forces the conclusion that the Price Anderson Act simply shields the commercial nuclear industry from costs that it would otherwise, in a fair market setting, be forced to internalize and pay. Price Anderson amounts to

457

Enforcement Letter-CHWM-Washington Group-5/20/09  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2009 20, 2009 Mr. John Fulton President and Chief Executive Officer CH2M-Washington Group Idaho, LLC 2525 Fremont Street Idaho Falls, Idaho 83415-5104 Dear Mr. Fulton: In July 2008, the U.S. Department of Energy (DOE) Office of Health, Safety and Security's, Office of Enforcement was made aware of numerous, longstanding electrical safety deficiencies associated with electrical equipment located on the east side of the Idaho Nuclear Technology and Engineering Center (INTEC). The Office of Enforcement is also aware that shortly after electrical safety issues with this equipment were identified by a CH2M-Washington Group Idaho, LLC (CWI) worker in May 2007, CWI completed an Engineering Design File (EDF-8253, dated August 9, 2007). The Engineering Design File identified widespread

458

Office of Federal and State Materials and Environmental Management Programs (FSME) Procedure Approval Reviewing the Non-Common Performance Indicator,  

E-Print Network (OSTI)

This procedure was first issued by the former Office of State and Tribal Programs. As of October 1, 2006, any changes to the procedure will be the responsibility of the FSME Procedure Contact. Copies of FSME procedures will be available through the NRC website. Procedure Title: Reviewing the Non-Common

Robert Lewis; A. Duncan White; Janine F. Katanic

2010-01-01T23:59:59.000Z

459

Enforcement Letter, CH2M-Washington Group Idaho LLC , - May 20, 2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

M-Washington Group Idaho LLC , - May 20, M-Washington Group Idaho LLC , - May 20, 2009 Enforcement Letter, CH2M-Washington Group Idaho LLC , - May 20, 2009 May 20, 2009 Enforcement Letter issued to CH2M-Washington Group Idaho, LLC, for Electrical Safety Deficiencies at the Idaho National Laboratory In July 2008, the U.S. Department of Energy (DOE) Office of Health, Safety and Security's, Office of Enforcement was made aware of numerous, longstanding electrical safety deficiencies associated with electrical equipment located on the east side of the Idaho Nuclear Technology and Engineering Center (INTEC). The Office of Enforcement is also aware that shortly after electrical safety issues with this equipment were identified by a CH2M-Washington Group Idaho, LLC (CWI) worker in May 2007, CWI completed an Engineering Design File

460

United States Office of Radiation and EPA 402-B-00-001 Environmental Protection Indoor Air August 2000  

E-Print Network (OSTI)

--Florida Institute of Phosphate Research. Microbiology and Radiochemistry of Phosphogypsum. Publ. No. 05., and Burnett, W. Radiochemistry of Florida Phosphogypsum. Journal of Environmental Radioactivity 32 (1996) no

Note: This page contains sample records for the topic "washington offices environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

A Field Study of PEM (Personal Environmental Module) Performance in Bank of America's San Francisco Office Buildings  

E-Print Network (OSTI)

Allen and Annette Quinn, of CEDR at UC Berkeley. REFERENCESof California, Berkeley, April, CEDR-01-97. eScholarshipfor Environmental Design Research (CEDR) at UC Berkeley. The

Bauman, Fred; Carter, Graham; Baughman, Anne; Arens, Edward A

1997-01-01T23:59:59.000Z

462

2012 Annual Planning Summary for Office of River Protection  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Office of River Protection.

463

2012 Annual Planning Summary for Kansas City Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within the Kansas City Site Office.

464

2012 Annual Planning Summary for Golden Field Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Golden Field Office.

465

2012 Annual Planning Summary for Loan Program Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Loan Program Office.

466

2012 Annual Planning Summary for Thomas Jefferson Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Thomas Jefferson Site Office.

467

2011 Annual Planning Summary for Pantex Site Office (PXSO)  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Pantex Site Office (PXSO).

468

2012 Annual Planning Summary for Pantex Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within the Pantex Site Office.

469

2012 Annual Planning Summary for Savannah River Operations Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Savannah River Operations Office.

470

2012 Annual Planning Summary for Ames Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 wit