Powered by Deep Web Technologies
Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Bonneville Power Admin (Washington) | Open Energy Information  

Open Energy Info (EERE)

Bonneville Power Admin Bonneville Power Admin Place Washington Utility Id 1738 References Energy Information Administration.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates Industrial: $0.0046/kWh The following table contains monthly sales and revenue data for Bonneville Power Admin (Washington). Month RES REV (THOUSAND $) RES SALES (MWH) RES CONS COM REV (THOUSAND $) COM SALES (MWH) COM CONS IND_REV (THOUSAND $) IND SALES (MWH) IND CONS OTH REV (THOUSAND $) OTH SALES (MWH) OTH CONS TOT REV (THOUSAND $) TOT SALES (MWH) TOT CONS 2009-03 2,220.339 71,908.718 8 2,220.339 71,908.718 8

2

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 30, 2012 July 30, 2012 CX-008891: Categorical Exclusion Determination Pilot Butte-La Pine No. 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 07/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration July 30, 2012 CX-008890: Categorical Exclusion Determination Bonneville Power Administration/Washington Department of Natural Resources Access Road Improvements CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration July 27, 2012 CX-008676: Categorical Exclusion Determination Four AT&T Wireless Communication Site Upgrades CX(s) Applied: B1.7, B1.19 Date: 07/27/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration

3

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Bonneville Power Administration Categorical Exclusion Determinations: Bonneville Power Administration Categorical Exclusion Determinations issued by Bonneville Power Administration. DOCUMENTS AVAILABLE FOR DOWNLOAD November 22, 2013 CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration November 19, 2013 CX-010735: Categorical Exclusion Determination Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration August 26, 2013 CX-010720: Categorical Exclusion Determination Monroe-Custer #2 Access Roads CX(s) Applied: B1.3

4

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 10, 2011 March 10, 2011 CX-005419: Categorical Exclusion Determination Ostrander Line Swap CX(s) Applied: B4.11 Date: 03/10/2011 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration March 7, 2011 CX-005418: Categorical Exclusion Determination Birch Creek Radio Tower CX(s) Applied: B4.6 Date: 03/07/2011 Location(s): Bonneville County, Idaho Office(s): Bonneville Power Administration March 7, 2011 CX-005417: Categorical Exclusion Determination Beaver Creek Property CX(s) Applied: B1.25 Date: 03/07/2011 Location(s): Okanogan County, Washington Office(s): Bonneville Power Administration March 3, 2011 CX-005411: Categorical Exclusion Determination Troutdale Substation Control House CX(s) Applied: B1.3 Date: 03/03/2011 Location(s): Troutdale, Oregon Office(s): Bonneville Power Administration

5

Map Locating Berkeley Lab Washington, DC Office  

NLE Websites -- All DOE Office Websites (Extended Search)

WASHINGTON, DC PROJECTS OFFICE WASHINGTON, DC PROJECTS OFFICE Map LEGEND: A:Berkeley Lab DC Office; PNNL; NREL; ORNL | B: EPA Waterside Mall C: Metrorail Station: Smithsonian | D: Metrorail Station: L'Enfant Plaza Notice: Due to security requirements in the building, all visitors to the Berkeley Lab DC Projects Office must check in at the ground floor entrance. If you do not have a DOE access badge, you will need to obtain a building visitor badge. To expedite this process, visitors are encouraged to RSVP to their meeting host or call (202) 488-2250 ahead of time. Metal detectors and x-ray screening of personal items are required for all visitors and staff entering the building. Directions to the Lab's Washington, DC Projects Office 901 D Street, SW Suite 950 Washington, DC 20024 Phone/Fax: (202) 488-2250

6

Management of Bonneville Power Administration's Information Technology Program, IG-0861  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management of Bonneville Power Management of Bonneville Power Administration's Information Technology Program DOE/IG-0861 March 2012 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 March 26, 2012 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Management of Bonneville Power Administration's Information Technology Program" INTRODUCTION AND OBJECTIVE The Bonneville Power Administration provides about 30 percent of wholesale electric power to regional utilities that service homes, hospitals, financial institutions, commercial entities and military installations in the Pacific Northwest. Bonneville makes extensive use of various

7

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 4, 2013 June 4, 2013 CX-010433: Categorical Exclusion Determination Memaloose Meadows Land Acquisition CX(s) Applied: B1.25 Date: 06/04/2013 Location(s): Oregon Offices(s): Bonneville Power Administration June 3, 2013 CX-010436: Categorical Exclusion Determination Tri-Cities Maintenance Headquarters Project CX(s) Applied: B1.15 Date: 06/03/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration June 3, 2013 CX-010435: Categorical Exclusion Determination De Moss Substation Expansion CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): Oregon Offices(s): Bonneville Power Administration June 3, 2013 CX-010434: Categorical Exclusion Determination LaPine Substation Shunt Reactor Addition CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

8

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 29, 2010 July 29, 2010 CX-003233: Categorical Exclusion Determination Purchase of Conservation Easements on Cottom and Beyeler Properties CX(s) Applied: B1.25 Date: 07/29/2010 Location(s): Lemhi County, Idaho Office(s): Bonneville Power Administration July 22, 2010 CX-003235: Categorical Exclusion Determination Adolfson-Feleding Property (Lavaside Property) Purchase CX(s) Applied: B1.25 Date: 07/22/2010 Location(s): Bingham County, Idaho Office(s): Bonneville Power Administration July 22, 2010 CX-003234: Categorical Exclusion Determination Demolition of Vacant House at Bonneville Power Administration's Ross Complex CX(s) Applied: B1.23 Date: 07/22/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration July 21, 2010 CX-003236: Categorical Exclusion Determination

9

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 9, 2011 June 9, 2011 CX-006197: Categorical Exclusion Determination Omak Area 3G Radio Site Upgrades CX(s) Applied: B1.19 Date: 06/09/2011 Location(s): Okanogan, Washington Office(s): Bonneville Power Administration June 1, 2011 CX-005969: Categorical Exclusion Determination Provision of Funds to Montana Fish, Wildlife and Parks for Purchase of the Perry Creek Property CX(s) Applied: B1.25 Date: 06/01/2011 Location(s): Lake County, Montana Office(s): Bonneville Power Administration May 26, 2011 CX-005968: Categorical Exclusion Determination Holcomb Radio Station and Naselle Substation Communication Upgrade Project CX(s) Applied: B1.7 Date: 05/26/2011 Location(s): Pacific County, Washington Office(s): Bonneville Power Administration May 25, 2011 CX-005967: Categorical Exclusion Determination

10

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 2, 2009 November 2, 2009 CX-000008: Categorical Exclusion Determination Raver-Paul #1 Access Road Improvement and Bridge Replacement CX(s) Applied: B1.3 Date: 11/02/2009 Location(s): Pierce County, Washington Office(s): Bonneville Power Administration October 27, 2009 CX-000007: Categorical Exclusion Determination Spirit Tap to Colville-Boundary #1 Landings and Access Roads Construction CX(s) Applied: B1.3, B1.13 Date: 10/27/2009 Location(s): Stevens County, Washington Office(s): Bonneville Power Administration October 8, 2009 CX-000004: Categorical Exclusion Determination Lane-Wendson #1 Structure 10/5 Access Road Improvement and Pole Replacement Project CX(s) Applied: B1.3 Date: 10/08/2009 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration October 8, 2009

11

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 19, 2012 September 19, 2012 CX-009203: Categorical Exclusion Determination Ross Maintenance Headquarters Project CX(s) Applied: B1.15 Date: 09/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration September 19, 2012 CX-009200: Categorical Exclusion Determination Respond to the Town of Eatonville's Land Use Review Request (LURR) CX(s) Applied: B4.7 Date: 09/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration September 14, 2012 CX-009204: Categorical Exclusion Determination Bonneville-Hood River Number 1 Danger Pole Replacement and Access Road Upgrades CX(s) Applied: B1.3 Date: 09/14/2012 Location(s): Oregon Offices(s): Bonneville Power Administration September 14, 2012 CX-009202: Categorical Exclusion Determination Port Angeles Substation Equipment Additions

12

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 12, 2012 June 12, 2012 CX-008698: Categorical Exclusion Determination Poorman Ponds Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 12, 2012 CX-008697: Categorical Exclusion Determination Sale of Line Mile 1 of the 115 Kilovolt (kV) Tanner Tap to Snoqualmie-Lake Tradition #1 Transmission Line CX(s) Applied: B1.24 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 12, 2012 CX-008696: Categorical Exclusion Determination Power Circuit Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/12/2012 Location(s): Washington, Oregon, Idaho, Montana, Wyoming Offices(s): Bonneville Power Administration June 5, 2012 CX-008702: Categorical Exclusion Determination Forest Grove-McMinnville #1 Wood Pole Replacement Projects

13

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 9, 2013 April 9, 2013 CX-010153: Categorical Exclusion Determination Chinook Property Funding - Update CX(s) Applied: B1.25 Date: 04/09/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 5, 2013 CX-010154: Categorical Exclusion Determination Digital Communication System Upgrade Project: 'D' Analog System Retirement and #WC SONET Ring CX(s) Applied: B1.19 Date: 04/05/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 3, 2013 CX-010155: Categorical Exclusion Determination Augspurger Radio Tower Replacement Project CX(s) Applied: B1.19 Date: 04/03/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 1, 2013 CX-010156: Categorical Exclusion Determination Chinook Property Funding CX(s) Applied: B1.25

14

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 16, 2013 July 16, 2013 CX-010581: Categorical Exclusion Determination Little Shell Property Funding CX(s) Applied: B1.25 Date: 07/16/2013 Location(s): Montana Offices(s): Bonneville Power Administration July 15, 2013 CX-010738: Categorical Exclusion Determination 2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 07/15/2013 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration July 10, 2013 CX-010584: Categorical Exclusion Determination Kokanee Bend South Conservation Easement Funding CX(s) Applied: B1.25 Date: 07/10/2013 Location(s): Montana Offices(s): Bonneville Power Administration July 3, 2013 CX-010587: Categorical Exclusion Determination Mariah Wind CX(s) Applied: B1.7 Date: 07/03/2013

15

Bonneville Power Administration Notice of Availability of Record of Decision for the Bonneville Power Administration/Puget Power Northwest Washington Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

74 74 Federal Register / Vol. 60, No. 197 / Thursday, October 12, 1995 / Notices to speak to the Committee, on a first come, first serve basis. Those who call in and reserve time will be given the opportunity to speak first. The Chairman is empowered to conduct the meeting in a fashion that will facilitate the orderly conduct of business. Transcripts and Minutes: Meeting minutes will be available for public review and copying at the Freedom of Information Public Reading Room, 1E-190, Forrestal Building, 1000 Independence Avenue, S.W., Washington, DC 20585 between 9:00 a.m. and 4:00 p.m., Monday through Friday, except Federal holidays. Issued at Washington, DC on October 5, 1995. Rachel M. Samuel, Acting Deputy Advisory Committee Management Officer. [FR Doc. 95-25215 Filed 10-11-95; 8:45 am]

16

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 16, 2010 March 16, 2010 CX-001179: Categorical Exclusion Determination Lancaster-Noxon Number 1 Mile 46-50 Access Road Improvement and Bridge Replacement Project CX(s) Applied: B1.3 Date: 03/16/2010 Location(s): Bonner County, Idaho Office(s): Bonneville Power Administration March 15, 2010 CX-001180: Categorical Exclusion Determination Monroe-Custer Number 1 and 2 500-Kilovolt Transmission Line Structure 16/2 Access Road Improvement and Bridge Replacement Project CX(s) Applied: B1.3 Date: 03/15/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration March 12, 2010 CX-001181: Categorical Exclusion Determination Santiam Substation Renovation CX(s) Applied: B1.16 Date: 03/12/2010 Location(s): Linn County, Oregon Office(s): Bonneville Power Administration

17

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 15, 2010 September 15, 2010 CX-004876: Categorical Exclusion Determination Casa Grande-Empire (Double Circuit Upgrade) CX(s) Applied: B4.13 Date: 09/15/2010 Location(s): Pinal County, Arizona Office(s): Bonneville Power Administration September 15, 2010 CX-003906: Categorical Exclusion Determination Fiscal Year 2010 Willamette Basin Mitigation CX(s) Applied: B1.25 Date: 09/15/2010 Location(s): Eugene, Oregon Office(s): Bonneville Power Administration September 10, 2010 CX-003791: Categorical Exclusion Determination Grant Access for Filling Potholes and for Paving Existing Roadway CX(s) Applied: B1.3 Date: 09/10/2010 Location(s): Clallam County, Washington Office(s): Bonneville Power Administration September 8, 2010 CX-003908: Categorical Exclusion Determination Fiscal Year 2010 Columbia Basin Fish Accords with Colville Confederated

18

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 8, 2010 June 8, 2010 CX-003092: Categorical Exclusion Determination Ross-Lexington Number 1 New Access Road Construction: 15/1 to 15/2 CX(s) Applied: B1.13 Date: 06/08/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration June 8, 2010 CX-002771: Categorical Exclusion Determination Marion and Sand Springs Substations Radio Tower Projects CX(s) Applied: B1.19 Date: 06/08/2010 Location(s): Marion, Oregon Office(s): Bonneville Power Administration June 4, 2010 CX-002773: Categorical Exclusion Determination Idaho Department of Fish and Game Purchase of Crystal Springs Trout Farm - Snake River Sockeye Captive Propagation Program CX(s) Applied: A7 Date: 06/04/2010 Location(s): Springfield, Idaho Office(s): Bonneville Power Administration June 3, 2010

19

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 5, 2011 August 5, 2011 CX-006482: Categorical Exclusion Determination Swan Valley - Palisades Communication Upgrade CX(s) Applied: B1.7, B4.6 Date: 08/05/2011 Location(s): Idaho Office(s): Bonneville Power Administration August 5, 2011 CX-006481: Categorical Exclusion Determination Funding Removal of Underground Storage Tank at Nelson Springs CX(s) Applied: B6.1 Date: 08/05/2011 Location(s): Richland, Washington Office(s): Bonneville Power Administration August 3, 2011 CX-006483: Categorical Exclusion Determination Balancing Authority Area Service Agreement with Lane Electric Cooperative, Inc. CX(s) Applied: B4.1 Date: 08/03/2011 Location(s): Eugene, Oregon Office(s): Bonneville Power Administration July 26, 2011 CX-006293: Categorical Exclusion Determination Provision of Funds to the Confederated Salish and Kootenai Tribes for

20

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 27, 2012 December 27, 2012 CX-009701: Categorical Exclusion Determination Williams Northwest Pipeline Land Use Review Request CX(s) Applied: B4.9 Date: 12/27/2012 Location(s): Washington Offices(s): Bonneville Power Administration December 27, 2012 CX-009700: Categorical Exclusion Determination Finely Creek and North Valley Creek Property Funding CX(s) Applied: B1.25 Date: 12/27/2012 Location(s): Montana, Montana Offices(s): Bonneville Power Administration December 21, 2012 CX-009702: Categorical Exclusion Determination Columbia Rural Electric Association Walla Walla Hydroelectric Project CX(s) Applied: B4.1 Date: 12/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration December 19, 2012 CX-009703: Categorical Exclusion Determination Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

DOE/EIS-0333; Draft NEPA/SEPA Environmental Impact Statement Bonneville Power Administration, Benton County, Washington (03/2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1520 Kelly Place 1520 Kelly Place Walla Walla, Washington 99362 March 26, 2002 In reply refer to: PTS/Walla Walla To: People Interested in the Maiden Wind Farm We would like to hear from you about Bonneville Power Administration (BPA) and Benton County's Draft Environmental Impact Statement (EIS) for the Maiden Wind Farm. If you requested a copy of the Draft EIS or Summary, it is enclosed for your review. Comments will be accepted until May 15, 2002. The Draft EIS describes the proposed project, tells why it may be needed, discusses the environmental and social impacts the project could create, and lists the mitigation measures that would lessen or eliminate those impacts. We greatly appreciate your time in reviewing the document and giving us

22

UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Washington, DC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFFICE OF PERSONNEL MANAGEMENT Washington, DC 20415 The Director November 8, 2010 MEMORANDUM FOR HEADS OF DEPARTMENTS AND AGENCIES FROM: JOHN BERRY ( . .. (t"t-.. DIRECTOR...

23

City of North Bonneville, Washington: Geothermal Exploration Project, production test well, Phase II. Final report  

SciTech Connect

Based on discussions with the City of North Bonneville, the production test well was drilled to a depth that would also explore for ground water temperatures near 130/sup 0/F (54.4/sup 0/C). Depth projections to a 130/sup 0/F bottom hole temperature were made by assuming a constant ground water temperature rise greater than 50/sup 0/C per kilometer, and by assuming that essentially homogeneous or equivalent conductive rock units would be encountered. Minimum water production requirements were not set, although the City determined that about 800 gpm would be acceptable. Large upper casing diameters of 16 and 12 inches were installed in order to provide the future use of either a vertical turbine or submersible pump, as desired by the city. The scope of work included interpretation of well characteristics, evaluation of ground water as a geothermal resource, geologic analysis of data from drilling and testing, drilling supervision, daily drilling cost accounting, and preparation of a final report. The report includes geologic evaluation of the drilling and test data, ground water and geothermal potential.

Not Available

1982-06-01T23:59:59.000Z

24

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 14, 2011 June 14, 2011 CX-006253: Categorical Exclusion Determination North Bonneville-Ross #1 230-Kilovolt, North Bonneville-Troutdale #2 230-Kilovolt Transmission Line Maintenance CX(s) Applied: B4.13 Date: 06/14/2011 Location(s): Clark County, Washington Office(s): Bonneville Power Administration June 10, 2011 CX-006198: Categorical Exclusion Determination South Tacoma - Frederickson Power Fiber Project CX(s) Applied: B4.7 Date: 06/10/2011 Location(s): Pierce County, Washington Office(s): Bonneville Power Administration June 9, 2011 CX-006197: Categorical Exclusion Determination Omak Area 3G Radio Site Upgrades CX(s) Applied: B1.19 Date: 06/09/2011 Location(s): Okanogan, Washington Office(s): Bonneville Power Administration June 8, 2011 CX-006049: Categorical Exclusion Determination

25

Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.  

SciTech Connect

For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA's Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

United States. Bonneville Power Administration. Office of Engineering.

1992-05-01T23:59:59.000Z

26

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 19, 2011 September 19, 2011 CX-006818: Categorical Exclusion Determination Grant New Cingular Wireless? Request for Use of Right-Of-Way at the Salem Substation CX(s) Applied: B4.9 Date: 09/19/2011 Location(s): Salem, Polk County, Oregon Office(s): Bonneville Power Administration September 16, 2011 CX-006820: Categorical Exclusion Determination Prosser Hatchery Storage Shed CX(s) Applied: B1.15 Date: 09/16/2011 Location(s): Prosser, Benton County, Washington Office(s): Bonneville Power Administration, Natural Gas Regulation September 16, 2011 CX-006819: Categorical Exclusion Determination Replace Aging Wood Poles on Trans Alta?s Centralia Tap to Chehalis-Covington No. 1 230-Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 09/16/2011 Location(s): Lewis County, Washington

27

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 1, 2012 May 1, 2012 CX-008153: Categorical Exclusion Determination Maupin-Tygh Valley Number 1 Pole Replacement Project CX(s) Applied: B1.3 Date: 05/01/2012 Location(s): Oregon Offices(s): Bonneville Power Administration May 1, 2012 CX-008152: Categorical Exclusion Determination Whitefish In-line Hydroelectric Project CX(s) Applied: B4.1 Date: 05/01/2012 Location(s): Montana Offices(s): Bonneville Power Administration April 30, 2012 CX-008154: Categorical Exclusion Determination In-Kind Wood Pole Replacements - Driscoll-Naselle Number 1 CX(s) Applied: B1.3 Date: 04/30/2012 Location(s): Washington Offices(s): Bonneville Power Administration April 24, 2012 CX-008156: Categorical Exclusion Determination Amended Provision of Funds to the Idaho Department of Fish and Game (IDFG)

28

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2011 8, 2011 CX-006063: Categorical Exclusion Determination Limited Firebreak Maintenance on the Hanford Site During Calendar Year 2011 CX(s) Applied: B1.3 Date: 06/28/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 24, 2011 EIS-0425: Draft Environmental Impact Statement Bonneville Power Administration Mid-Columbia Coho Restoration Project, Chelan and Okanogan Counties, WA June 24, 2011 EIS-0425: EPA Notice of Availability of Draft Environmental Impact Statement Bonneville Power Administration Mid-Columbia Coho Restoration Project, Chelan and Okanogan Counties, WA June 22, 2011 CX-006255: Categorical Exclusion Determination Indian Cabin Road Repair Date: 06/22/2011 Location(s): Skamania County, Washington Office(s): Bonneville Power Administration

29

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

26, 2010 26, 2010 CX-003272: Categorical Exclusion Determination Washington-City-Everett CX(s) Applied: A1, A9, A11, B1.32, B5.1 Date: 07/26/2010 Location(s): Everett, Washington Office(s): Energy Efficiency and Renewable Energy July 23, 2010 EIS-0119: Amended Record of Decision Decommissioning of Eight Surplus Production Reactors at the Hanford Site, Richland, Washington July 22, 2010 CX-003234: Categorical Exclusion Determination Demolition of Vacant House at Bonneville Power Administration's Ross Complex CX(s) Applied: B1.23 Date: 07/22/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration July 21, 2010 CX-003236: Categorical Exclusion Determination Augspurger Fiber Replacement Project CX(s) Applied: B1.7, B4.7 Date: 07/21/2010 Location(s): Skamania County, Washington

30

BLM Washington Office | Open Energy Information  

Open Energy Info (EERE)

Bureau of Land Management Address 1849 C Street NW, Rm. 5665 Place Washington, DC Zip 20240 Phone number 202-208-3801 Website http:www.blm.govwostenin References...

31

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 3, 2011 March 3, 2011 CX-005410: Categorical Exclusion Determination North Bonneville-Alcoa Number 1 and 2 Transmission Line Corridor CX(s) Applied: B1.3 Date: 03/03/2011 Location(s): Clark County, Washington Office(s): Bonneville Power Administration March 3, 2011 CX-005409: Categorical Exclusion Determination Olympia-Grand Coulee Number 1 Transmission Line CX(s) Applied: B1.3 Date: 03/03/2011 Location(s): Washington Office(s): Bonneville Power Administration March 2, 2011 CX-005379: Categorical Exclusion Determination Insulator Replacement in Agricultural Lands Along the Grand Coulee-Bell Number 3/Grand Coulee-Westside No. 1 Double Circuit 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/02/2011 Location(s): Lincoln County, Washington Office(s): Bonneville Power Administration

32

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25, 2010 25, 2010 CX-003611: Categorical Exclusion Determination Schultz - Raver Number 3 and 4 500-kilovolt (kV) Transmission Lines Spacer Replacement CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): King County, Washington Office(s): Bonneville Power Administration August 25, 2010 CX-003610: Categorical Exclusion Determination Ross-Lexington Number 1 Access Road Repair Project CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration August 25, 2010 CX-003609: Categorical Exclusion Determination Cushman North Fork Skokomish Powerhouse CX(s) Applied: A9 Date: 08/25/2010 Location(s): Tacoma, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 25, 2010 CX-003614: Categorical Exclusion Determination

33

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13, 2010 13, 2010 CX-003035: Categorical Exclusion Determination Pacific Northwest Smart Grid Demonstration CX(s) Applied: A1, A9, A11, B1.7, B4.4, B5.1 Date: 07/13/2010 Location(s): Fox Island, Washington Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory July 12, 2010 CX-003628: Categorical Exclusion Determination Kittitas County Conservation Easement Acquisition CX(s) Applied: B1.25 Date: 07/12/2010 Location(s): Kittitas County, Washington Office(s): Bonneville Power Administration July 12, 2010 CX-003447: Categorical Exclusion Determination Bridge and Access Road Maintenance CX(s) Applied: B1.3 Date: 07/12/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration July 12, 2010 CX-003240: Categorical Exclusion Determination

34

NREL: Energy Analysis - Washington D.C. Office Staff  

NLE Websites -- All DOE Office Websites (Extended Search)

Washington D.C. Office Washington D.C. Office The following SEAC staff are based in our Washington D.C. Office. They support a variety of programs and activities, and often are the liaison between the U.S. Department of Energy and staff based in Golden, Colorado. Team Lead: Margaret Mann (Golden) Administrative Support: JoAnn Weaver (Golden) Thomas Jenkin Austin Brown David J. Feldman Tom Schneider Robert Margolis Kathleen Nawaz Monisha Shah Photo of Austin Brown. Austin Brown Senior Analyst (Strategic Planning) Areas of expertise Crosscutting low-carbon strategies Clean transportation technologies and policies Primary research interests Clean energy research portfolio planning Energy and society Sustainable transportation systems More information on Austin Brown Photo of David J. Feldman

35

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11, 2011 11, 2011 EIS-0422: Record of Decision Bonneville Power Administration's Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project March 11, 2011 CX-005421: Categorical Exclusion Determination Ohop Underbuild Project CX(s) Applied: B4.6, B4.12 Date: 03/11/2011 Location(s): Pierce County, Washington Office(s): Bonneville Power Administration March 7, 2011 CX-005417: Categorical Exclusion Determination Beaver Creek Property CX(s) Applied: B1.25 Date: 03/07/2011 Location(s): Okanogan County, Washington Office(s): Bonneville Power Administration March 4, 2011 Latest 200 Area Demolition Offers Snapshot of Hanford Cleanup Progress: Recovery Act Funding Allows Demolition of Power Houses Ahead of Schedule RICHLAND, WASH. - Today's safe and successful explosive demolition at

36

Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington Washington , DC 20585 September 20, 2012 MEMORANDUM FOR HEADS OF CONTRACTING ACTIVITY AND PROCUREMENT DIRECTORS FROM : SUBJECT: PAULBOSCO~~ - SENIOR PROCUhM~ OFFICE OF ACQUISITION AND PROJECT MANAGEMENT JOSEPH F. WADDELL SENIOR PROCUREMENT NNSA OFFICE OF ACQ SITION MANAGEMENT Acquisition Savings Reporting Template Guidance The Department is continuing to make progress in its efforts to support the Office of Management and Budget (OMB) Acquisition Savings Initiative, as well as the Department's Strategic Sourcing Program. After using our current reporting template for the past year, it was a good time to review the process and make adjustments where necessary. The Government Accountability Office (GAO) has also noted in an audit that

37

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 23, 2010 November 23, 2010 CX-004464: Categorical Exclusion Determination Central Ferry Area Radio Communications Project CX(s) Applied: B4.6 Date: 11/01/2010 Location(s): Franklin County, Washington Office(s): Bonneville Power Administration November 19, 2010 CX-004524: Categorical Exclusion Determination Washington State University Building Upgrades and Resource Conservation Manager CX(s) Applied: A9, A11, B5.1 Date: 11/19/2010 Location(s): Clark County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 19, 2010 CX-004525: Categorical Exclusion Determination Energy Services Corps CX(s) Applied: A9, A11, B5.1 Date: 11/19/2010 Location(s): Kitsap County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

38

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 15, 2010 March 15, 2010 CX-001180: Categorical Exclusion Determination Monroe-Custer Number 1 and 2 500-Kilovolt Transmission Line Structure 16/2 Access Road Improvement and Bridge Replacement Project CX(s) Applied: B1.3 Date: 03/15/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration March 12, 2010 CX-006365: Categorical Exclusion Determination Washington-City-Spokane CX(s) Applied: A9, A11, B2.5, B5.1 Date: 03/12/2010 Location(s): Spokane, Washington Office(s): Energy Efficiency and Renewable Energy March 12, 2010 CX-006364: Categorical Exclusion Determination Washington-City-Pasco CX(s) Applied: A9, A11, B5.1 Date: 03/12/2010 Location(s): Pasco, Washington Office(s): Energy Efficiency and Renewable Energy March 12, 2010 CX-001182: Categorical Exclusion Determination

39

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 15, 2013 July 15, 2013 CX-010738: Categorical Exclusion Determination 2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 07/15/2013 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration July 2, 2013 CX-010588: Categorical Exclusion Determination Chehalis Substation Tree Clearing CX(s) Applied: B1.3 Date: 07/02/2013 Location(s): Washington Offices(s): Bonneville Power Administration July 1, 2013 CX-010589: Categorical Exclusion Determination Nine Canyon Communication Tower Addition CX(s) Applied: B4.6 Date: 07/01/2013 Location(s): Washington Offices(s): Bonneville Power Administration June 25, 2013 CX-010429: Categorical Exclusion Determination Harbour Pointe Small Generator Integration

40

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 13, 2010 October 13, 2010 CX-004253: Categorical Exclusion Determination Northwest Natural Devine Road Land Use Review Request CX(s) Applied: B4.9 Date: 10/13/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration October 13, 2010 CX-004252: Categorical Exclusion Determination Replace Two Broken Transformers Near the Roza Dam Adult Trap Facility CX(s) Applied: B4.6 Date: 10/13/2010 Location(s): Kittitas County, Washington Office(s): Bonneville Power Administration October 8, 2010 EIS-0456: Final Environmental Impact Statement Cushman Hydroelectric Project (FERC Project No. 460) October 8, 2010 EIS-0456: Final Environmental Impact Statement (Appendices) Cushman Hydroelectric Project (FERC Project No. 460), Washington Comments and responses to DEIS-0456: Cushman Hydroelectric Project.

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2011 22, 2011 CX-006583: Categorical Exclusion Determination Wood Pole Replacement Along Portions of the Grand Coulee-Chief Joseph #1 and #2 230-Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13 Date: 08/22/2011 Location(s): Douglas County, Washington Office(s): Bonneville Power Administration August 22, 2011 CX-006580: Categorical Exclusion Determination Wood Pole Replacement Along the Grand Coulee-Okanogan #2 115-Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13 Date: 08/22/2011 Location(s): Grant County, Washington Office(s): Bonneville Power Administration August 18, 2011 EA-1728: Draft Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington August 15, 2011 EIS-0245-SA-03: Supplement Analysis Management of Spent Nuclear Fuel from the K Basins at the Hanford Site,

42

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2011 20, 2011 CX-006817: Categorical Exclusion Determination McNary-Ross No. 1 Upgrade Project, Surface Impairment Removal CX(s) Applied: B1.3 Date: 09/20/2011 Location(s): Klickitat and Clark Counties, Washington Office(s): Bonneville Power Administration September 19, 2011 CX-006840: Categorical Exclusion Determination Security Barrier Relocation at the 618-11 Burial Grounds CX(s) Applied: B1.15 Date: 09/19/2011 Location(s): Richland, Washington Office(s): River Protection-Richland Operations Office, Golden Field Office September 19, 2011 CX-006839: Categorical Exclusion Determination Training Exercises and Simulations on the Hanford Site CX(s) Applied: B1.2 Date: 09/19/2011 Location(s): Richland, Washington Office(s): River Protection-Richland Operations Office September 16, 2011

43

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 26, 2010 July 26, 2010 CX-003272: Categorical Exclusion Determination Washington-City-Everett CX(s) Applied: A1, A9, A11, B1.32, B5.1 Date: 07/26/2010 Location(s): Everett, Washington Office(s): Energy Efficiency and Renewable Energy July 26, 2010 CX-003170: Categorical Exclusion Determination Innovative Phase Change Thermal Energy Storage Solution for Baseload Power CX(s) Applied: B3.6 Date: 07/26/2010 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 22, 2010 CX-003234: Categorical Exclusion Determination Demolition of Vacant House at Bonneville Power Administration's Ross Complex CX(s) Applied: B1.23 Date: 07/22/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration July 21, 2010 CX-003236: Categorical Exclusion Determination

44

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 3, 2010 May 3, 2010 CX-002190: Categorical Exclusion Determination Nisqually Indian Tribe of the Nisqually Reservation Energy Efficiency Retrofits of Tribal Center CX(s) Applied: B2.5, B5.1 Date: 05/03/2010 Location(s): Nisqually Reservation, Washington Office(s): Energy Efficiency and Renewable Energy May 3, 2010 CX-002438: Categorical Exclusion Determination Rocky Reach-Maple Valley Number-1 Transmission Line Bridge Replacement Project CX(s) Applied: B1.3 Date: 05/03/2010 Location(s): Kittitas County, Washington Office(s): Bonneville Power Administration April 30, 2010 CX-002137: Categorical Exclusion Determination Farm Power Lynden CX(s) Applied: B5.1 Date: 04/30/2010 Location(s): Lynden, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

45

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28, 2011 28, 2011 EIS-0423: Final Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury January 28, 2011 CX-005134: Categorical Exclusion Determination Provision of Funds to the Yakama Nation for the Purchase of Three Parcels of Property Along Reecer Creek CX(s) Applied: B1.25 Date: 01/28/2011 Location(s): Kittitas County, Washington Office(s): Bonneville Power Administration January 28, 2011 EIS-0423: EPA Notice of Availability of the Final Environmental Impact Statement Long -Term Management and Storage of Elemental Mercury January 21, 2011 CX-005130: Categorical Exclusion Determination Ringold Substation Structure Replacement Project CX(s) Applied: B4.6 Date: 01/21/2011 Location(s): Basin City, Washington Office(s): Bonneville Power Administration

46

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2011 0, 2011 CX-006068: Categorical Exclusion Determination Site Characterization and Environmental Monitoring CX(s) Applied: B3.1 Date: 06/20/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 14, 2011 Massive Cement Pour into Hanford Site Nuclear Facility Underway: Recovery Act Funding Puts U Canyon in Home Stretch of Demolition Preparations RICHLAND, Wash. - Hanford workers are pouring enough cement-like material to fill six Olympic-size swimming pools in one of the U.S. Department of Energy's (DOE) largest nuclear facilities at the Hanford Site in southeast Washington State to prepare the massive building for demolition. June 14, 2011 CX-006253: Categorical Exclusion Determination North Bonneville-Ross #1 230-Kilovolt, North Bonneville-Troutdale #2

47

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 15, 2010 June 15, 2010 CX-003090: Categorical Exclusion Determination Perform Routine Access Road Maintenance within the McNary-Ross Number 1 Transmission Line Corridor CX(s) Applied: B1.3 Date: 06/15/2010 Location(s): Klickitat County, Washington Office(s): Bonneville Power Administration June 11, 2010 More than $60 Million in Recovery Act Funding to Expand Local Energy Efficiency Efforts in 20 Communities Competitive block grants to support jobs, save money and increase energy independence June 10, 2010 CX-002767: Categorical Exclusion Determination Granite Mountain 3G Radio Station Project CX(s) Applied: B1.19 Date: 06/10/2010 Location(s): Stevens County, Washington Office(s): Bonneville Power Administration June 9, 2010 Clark County Develops On-the-Job Weatherization Training Program

48

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington Washington Categorical Exclusion Determinations: Washington Location Categorical Exclusion Determinations issued for actions in Washington. DOCUMENTS AVAILABLE FOR DOWNLOAD November 22, 2013 CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration November 19, 2013 CX-010735: Categorical Exclusion Determination Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration September 24, 2013 CX-011171: Categorical Exclusion Determination Longview and Tillamook Substation Communication Upgrades CX(s) Applied: B1.7 Date: 09/24/2013

49

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15, 2010 15, 2010 CX-001639: Categorical Exclusion Determination Transportation Demand Management on 164th S/128th SW/20th SE CX(s) Applied: A9, A11, B5.1 Date: 04/15/2010 Location(s): Snohomish County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 15, 2010 CX-001821: Categorical Exclusion Determination SGL Automotive Carbon Limited Liability Company (LLC) CX(s) Applied: B5.1 Date: 04/15/2010 Location(s): Moses Lake, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office March 31, 2010 CX-001386: Categorical Exclusion Determination Dragoon Creek Access to Bonneville Power Administration's Bell-Boundary #3 Transmission Line to Replace Existing Bridge CX(s) Applied: B1.13, B1.3 Date: 03/31/2010 Location(s): Spokane County, Washington

50

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 15, 2011 February 15, 2011 CX-005262: Categorical Exclusion Determination Woodland and 148th Clearwire Wireless Communication Project CX(s) Applied: B1.7, B1.19 Date: 02/15/2011 Location(s): Pierce County, Washington Office(s): Bonneville Power Administration February 11, 2011 CX-005224: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 02/11/2011 Location(s): Bellevue, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory February 10, 2011 CX-005218: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 02/10/2011 Location(s): Renton, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy

51

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 30, 2010 June 30, 2010 CX-003023: Categorical Exclusion Determination Output Power Purchase Agreement with Northwest Energy Supply Cooperative - Barr-Tech, LLC Resource CX(s) Applied: B4.1 Date: 06/30/2010 Location(s): Fishtrap, Washington Office(s): Bonneville Power Administration June 30, 2010 CX-002874: Categorical Exclusion Determination Game Farm Park Energy Efficient Replacement Lighting Project CX(s) Applied: B2.5, B5.1 Date: 06/30/2010 Location(s): Auburn, Washington Office(s): Energy Efficiency and Renewable Energy June 30, 2010 CX-002873: Categorical Exclusion Determination Green House Gas Inventory CX(s) Applied: A9, A11, B5.1 Date: 06/30/2010 Location(s): Auburn, Washington Office(s): Energy Efficiency and Renewable Energy June 24, 2010 CX-002876: Categorical Exclusion Determination

52

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 25, 2010 August 25, 2010 CX-003610: Categorical Exclusion Determination Ross-Lexington Number 1 Access Road Repair Project CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration August 25, 2010 CX-003609: Categorical Exclusion Determination Cushman North Fork Skokomish Powerhouse CX(s) Applied: A9 Date: 08/25/2010 Location(s): Tacoma, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 25, 2010 CX-003614: Categorical Exclusion Determination Badger Canyon Substation Radio Communication Tower Project CX(s) Applied: B1.7, B1.19 Date: 08/25/2010 Location(s): Benton County, Washington Office(s): Bonneville Power Administration August 24, 2010 CX-003613: Categorical Exclusion Determination

53

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 7, 2011 July 7, 2011 CX-006111: Categorical Exclusion Determination Washington-Tribe-Stillaguamish Tribe of Indians CX(s) Applied: A1, A9, B2.5, B5.1 Date: 07/07/2011 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy July 7, 2011 CX-006262: Categorical Exclusion Determination Central Ferry Fiber Project CX(s) Applied: B1.7, B4.7 Date: 07/07/2011 Location(s): Walla Walla County, Washington Office(s): Bonneville Power Administration July 2, 2011 CX-008688: Categorical Exclusion Determination Installation of equipment at Wahkiakum Public Utility District's Cathlamet Substation CX(s) Applied: B4.6 Date: 07/02/2011 Location(s): Washington Offices(s): Bonneville Power Administration June 30, 2011 CX-008011: Categorical Exclusion Determination Install EMSL Super-Computer Power Infrastructure

54

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 22, 2012 June 22, 2012 CX-008692: Categorical Exclusion Determination Amendment Number 2 to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 06/22/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration June 21, 2012 CX-008695: Categorical Exclusion Determination Munro Control Center Expansion CX(s) Applied: B1.15 Date: 06/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 20, 2012 CX-008694: Categorical Exclusion Determination Acquisition and Disposition of Property CX(s) Applied: B1.24 Date: 06/20/2012 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration June 20, 2012 CX-008693: Categorical Exclusion Determination Wood Pole Structure Replacements on the Chehalis-Centralia No. 2 115 Kilovolt Transmission Line

55

Bonneville Power Administration (BPA)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Staff version which still requires senior executive review Staff version which still requires senior executive review Office of Office of Human Capita Human Capital Management Management Bonneville Power Administration Risk Informed Human Capital - Workforce Plan 2007-2009 September 15, 2006 2007 BPA Risk Informed Human Capital - Workforce Plan Table of Contents INTRODUCTION............................................................................................................. 5 Impact of the 2006 Workforce Plan ..............................................................................................6 BPA Strategic Objectives as drivers of the WP .......................................................................... 6 I. CONTEXT ................................................................................................................... 6

56

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 5, 2010 October 5, 2010 CX-004255: Categorical Exclusion Determination Replace Spacer Dampers Along the Chief Joseph PH-Chief Joseph Number 6 500-Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 10/05/2010 Location(s): Douglas County, Washington Office(s): Bonneville Power Administration October 4, 2010 CX-004076: Categorical Exclusion Determination East Omak Substation Fiber Project CX(s) Applied: B1.15 Date: 10/04/2010 Location(s): Okanogan County, Washington Office(s): Bonneville Power Administration September 30, 2010 CX-004116: Categorical Exclusion Determination Advanced Energy Efficient Building Technologies for High Performance Hospitals CX(s) Applied: A9, A11 Date: 09/30/2010 Location(s): Redmond, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy

57

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 7, 2011 October 7, 2011 CX-006814: Categorical Exclusion Determination Columbia Rural Electric Association (Columbia REA) Dayton Substation Tap Line Project CX(s) Applied: B4.12 Date: 10/07/2011 Location(s): Dayton, Columbia County, Washington Office(s): Bonneville Power Administration September 28, 2011 CX-006957: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project - Seattle Public Utilities CX(s) Applied: B5.1 Date: 09/28/2011 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, Sandia Site Office September 26, 2011 EIS-0421: Record of Decision Big Eddy-Knight Transmission Project Wasco County, Oregon and Klickitat County, Washington September 26, 2011 CX-006843: Categorical Exclusion Determination ER52 Fire Station Warning Signals

58

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 9, 2010 September 9, 2010 CX-003832: Categorical Exclusion Determination Issaquah Highlands Zero Energy Affordable Housing CX(s) Applied: A9, B2.2, B2.5, B5.1, B6.3 Date: 09/09/2010 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory September 8, 2010 CX-003908: Categorical Exclusion Determination Fiscal Year 2010 Columbia Basin Fish Accords with Colville Confederated Tribes CX(s) Applied: B1.25 Date: 09/08/2010 Location(s): Okanogan County, Washington Office(s): Bonneville Power Administration September 8, 2010 CX-003789: Categorical Exclusion Determination Grandview-Red Mountain Number 1 Proposed Transmission Line Interconnection CX(s) Applied: B4.6 Date: 09/08/2010 Location(s): Benton County, Washington

59

Bonneville Power Administration Fish and Wildlife Implementation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Trademark Office, Washington, DC 20231, Term-expires September 30, 2001 Jin F. Ng, Director, Patent Examining Group, Patent and Trademark Office, Washington, DC 20231,...

60

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 21, 2012 May 21, 2012 CX-008716: Categorical Exclusion Determination Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-Kilovolt (kV) Line/Convert Microwave Signals From Analog To Digital CX(s) Applied: B1.7 Date: 05/21/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration May 18, 2012 CX-009096: Categorical Exclusion Determination U.S. Customs and Border Protection Non-Intrusive Inspection Tests CX(s) Applied: B3.10, B3.11 Date: 05/18/2012 Location(s): Washington Offices(s): Pacific Northwest Site Office May 17, 2012 CX-008717: Categorical Exclusion Determination Relocation of Wood Poles on Centralia B Street No. 1 for Proposed Centralia City Light May Street Substation CX(s) Applied: B4.6 Date: 05/17/2012

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 9, 2010 March 9, 2010 CX-001183: Categorical Exclusion Determination Replace Rock Creek-John Day Number 1 Spacers CX(s) Applied: B1.3 Date: 03/09/2010 Location(s): Klickitat County, Washington Office(s): Bonneville Power Administration March 3, 2010 CX-001185: Categorical Exclusion Determination Replace Spacer Dampers Along the Wautoma-Rock Creek Number 1 500 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/03/2010 Location(s): Benton County, Yakima County, Office(s): Bonneville Power Administration March 1, 2010 CX-001040: Categorical Exclusion Determination Puget Sound Clean Cities Coalition Petroleum Reduction Project - Conversion CX(s) Applied: B5.1 Date: 03/01/2010 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

62

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 28, 2010 April 28, 2010 CX-002135: Categorical Exclusion Determination Barr-Tech - Green Waste To Renewable Energy CX(s) Applied: B5.1 Date: 04/28/2010 Location(s): Sprague, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 27, 2010 CX-002236: Categorical Exclusion Determination C-Farm Electrical, Lighting, and Walkway Upgrades CX(s) Applied: B1.13, B2.1, B1.3 Date: 04/27/2010 Location(s): Richland, Washington Office(s): Environmental Management, Office of River Protection-Richland Office April 23, 2010 CX-002213: Categorical Exclusion Determination Spacer replacement along the Hanford-Wautoma #1 and #2 (substation to substation) transmission lines CX(s) Applied: B1.3 Date: 04/23/2010 Location(s): Benton County, Washington Office(s): Bonneville Power Administration

63

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 5, 2013 April 5, 2013 CX-010154: Categorical Exclusion Determination Digital Communication System Upgrade Project: 'D' Analog System Retirement and #WC SONET Ring CX(s) Applied: B1.19 Date: 04/05/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 3, 2013 CX-010155: Categorical Exclusion Determination Augspurger Radio Tower Replacement Project CX(s) Applied: B1.19 Date: 04/03/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 3, 2013 CX-010094: Categorical Exclusion Determination Activity-Specific Categorical Exclusion for Deep Borehole Drilling, Sampling, and Characterization for the Proposed Natural Gas Pipeline from Pasco, Washington to the Hanford Site 200 East Area CX(s) Applied: B3.1 Date: 04/03/2013 Location(s): Washington

64

BERAC Meeting March 9-11, 2011 Washington, DC | U.S. DOE Office of Science  

Office of Science (SC) Website

March 9-11, 2011 Washington, DC March 9-11, 2011 Washington, DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting March 9-11, 2011 Washington, DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting March 9-10, 2011 Washington, DC Agenda .pdf file (7KB) Presentations Warren Washington .pptx file (29.0MB), The Present and Future of Climate Modeling William Brinkman .pptx file (25.3MB), Office of Science Report Sharlene Weatherwax .pdf file (446KB), State of BER Report Paul Bryan .pptx file (2.4MB), Activities in DOE's Office of Biomass Programs Gary Geernaert .pptx file (8.3MB), Climate and Environmental Sciences

65

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 4, 2011 April 4, 2011 CX-005572: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant - Washington-Tribe-Cowlitz Indian Tribe CX(s) Applied: B2.5, B5.1 Date: 04/04/2011 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy March 30, 2011 CX-005577: Categorical Exclusion Determination Provision of Funds to the Confederated Tribes of the Colville Reservation for the Purchase of the Ninemile Creek Property Date: 03/30/2011 Location(s): Washington Office(s): Bonneville Power Administration March 27, 2011 CX-005474: Categorical Exclusion Determination Charging Stations - Willis D. Tucker Park CX(s) Applied: B5.1 Date: 03/14/2011 Location(s): Snohomish, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy

66

Washington Regions | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Regions Regions National Science Bowl® (NSB) NSB Home About High School High School Students High School Coaches High School Regionals High School Rules, Forms, and Resources Middle School Attending National Event Volunteers 2013 Competition Results News Media WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: 202-586-6702 E: National.Science.Bowl@science.doe.gov High School Regionals Washington Regions Print Text Size: A A A RSS Feeds FeedbackShare Page Washington Coaches can review the high school regional locations listed below. Please note: Registrations are based on the location of your school. Please be sure to select the regional that is designated for your school's state, county, city, or district.

67

Washington Regions | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Regions Regions National Science Bowl® (NSB) NSB Home About High School Middle School Middle School Students Middle School Coaches Middle School Regionals Middle School Rules, Forms, and Resources Attending National Event Volunteers 2013 Competition Results News Media WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: 202-586-6702 E: National.Science.Bowl@science.doe.gov Middle School Regionals Washington Regions Print Text Size: A A A RSS Feeds FeedbackShare Page Washington Coaches can review the middle school regional locations listed below. Please note: Registrations are based on the location of your school. Please be sure to select the regional that is designated for your

68

DOE - Office of Legacy Management -- Carnegie Institute of Washington Dept  

Office of Legacy Management (LM)

Carnegie Institute of Washington Carnegie Institute of Washington Dept of Genetics - NY 0-07 FUSRAP Considered Sites Site: Carnegie Institute of Washington (Dept. of Genetics) (NY.0-07 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Cold Spring Harbor , New York NY.0-07-1 Evaluation Year: 1987 NY.0-07-1 Site Operations: This site served as a meeting place on June 25, 1942 for the 'Executive Committee of S-1,' a group comprised of various military and academic personnel. Discussions took place regarding what contracts should be extended beyond July 1, 1942 for scientific and other technical work done for the U.S. Government. NY.0-07-2 Site Disposition: Eliminated NY.0-07-1 Radioactive Materials Handled: None Indicated

69

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 26, 2011 July 26, 2011 Hanford Reaches Recovery Act Goal for Waste Cleanup Ahead of Schedule - Workers Shipped 1,800 Cubic Meters for Treatment and Disposal RICHLAND, Wash. - Today, the Department of Energy Hanford Site announced it reached a cleanup goal more than two months ahead of schedule at the Hanford Site in southeast Washington State. July 25, 2011 CX-006290: Categorical Exclusion Determination Cardwell-Cowlitz 2011 Wood Pole Replacements CX(s) Applied: B1.3 Date: 07/25/2011 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration July 21, 2011 CX-006304: Categorical Exclusion Determination Grand Coulee-Bell #3/Grand Coulee-Westside #1 Insulator Replacement and Access Road Maintenance CX(s) Applied: B1.3 Date: 07/21/2011 Location(s): Grant County, Washington

70

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21, 2011 21, 2011 CX-007750: Categorical Exclusion Determination Highlands Trail in the Longview-Cowlitz Number 1 Transmission Line Right-of-Way CX(s) Applied: B4.9 Date: 12/21/2011 Location(s): Washington Offices(s): Bonneville Power Administration December 16, 2011 Cows like these in Skagit County, Washington, supply the biodigester developed by Kevin Maas of Farm Power up to 70,000 gallons of manure per day. The newest Farm Power facility in Washington generates enough electricity to power 500 homes. Photo courtesy of sea_turtle. Farming Out Heat and Electricity through Biopower The newest biodigester at the Farm Power facility in Washington generates electricity from biogas created from bacteria's anaerobic digestion of cow

71

BERAC Meeting, February 16-17, 2012, Washington, DC| U.S. DOE Office of  

Office of Science (SC) Website

February 16-17, 2012, Washington, DC February 16-17, 2012, Washington, DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting, February 16-17, 2012, Washington, DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting February 16-17, 2012 Washington, DC Agenda .pdf file (25KB) Presentations William Brinkman, Comments from the Director, Office of Science .pdf file (24.4MB) Sharlene Weatherwax, State of BER Report .pdf file (4.3MB) Eddy Rubin, Joint Genome Institute Update .ppt file (18.0MB) Allison Campbell, Environmental Molecular Sciences Laboratory (EMSL) Update .pdf file (17.8MB) Adam Arkin, Knowledgebase Discussion .pdf file (8.9MB)

72

BERAC Meeting April 25-26, 2002 Washington, DC | U.S. DOE Office of Science  

Office of Science (SC) Website

25-26, 2002 Washington, DC 25-26, 2002 Washington, DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting April 25-26, 2002 Washington, DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting April 25-26, 2002 Washington DC Agenda .pdf file (6KB) Available Presentations James Decker .ppt file (22.1MB), Principal Deputy Director, Office of Science Rod Brown .ppt file (70KB), Deputy Undersecretary for Research, Education and Economics, USDA Ari Patrinos .ppt file (64KB), Associate Director for Biological & Environmental Research Dick Swaja .ppt file (74KB), National Institute of Biomedical Imaging and

73

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 5, 2011 January 5, 2011 CX-005015: Categorical Exclusion Determination Redland South and Oregon City Microwave Tower Wireless Communication Projects CX(s) Applied: B1.7, B1.19 Date: 01/05/2011 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration December 22, 2010 CX-004850: Categorical Exclusion Determination Marion to Santiam Fiber Installation CX(s) Applied: B4.7 Date: 12/22/2010 Location(s): Marion, Oregon Office(s): Bonneville Power Administration December 13, 2010 CX-004742: Categorical Exclusion Determination De Moss-Fossil 115-Kilovolt Line Upgrade CX(s) Applied: B4.6 Date: 12/13/2010 Location(s): Wasco County, Oregon Office(s): Bonneville Power Administration December 9, 2010 CX-004744: Categorical Exclusion Determination Provision of Funds to Confederated Salish and Kootenai Tribes (CSKT) for

74

UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Washington, DC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November November 8, 2010 MEMORANDUM FOR HEADS OF DEPARTMENTS AND AGENCIES FROM: JOHN BERRY \ (\ .~ .. (t"t-..~ DIRECTOR \~Ii" \"'b' ~ U Subject:ModelStrategiesfor RQitment andHiringof PeoplewithDisabilitiesas Required UnderExecutiveOrder 13548 On July 26,2010, President Obama issued Executive Order (EO) 13548, which directs Executive departments and agencies (agencies) to improve their efforts to employ Federal workers with disabilities and targeted disabilities through increased recruitment, hiring, and retention of these individuals. OPM, in consultation with the White House, the Department of Labor (DOL), the Equal Employment Opportunity Commission (EEOC), and the Office of Management and Budget (OMB), has developed, as required by the EO, model recruitment and hiring strategies for agencies to use to increase their employment of people with disabilities.

75

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 15, 2011 April 15, 2011 CX-005676: Categorical Exclusion Determination Murray-Custer #1 Transmission Line Wood Pole Replacement CX(s) Applied: B1.3 Date: 04/15/2011 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration April 13, 2011 Algae samples back at the NREL lab, ready to be analyzed and run through the Fluorescent-Activated Cell Sorter, or FACS, which separates the cells. | Credit: NREL Staff Photographer Dennis Schroeder. Study: Algae Could Replace 17% of U.S. Oil Imports A new study from Pacific Northwest National Lab concludes that 17% of U.S. oil imports for transportation could be replaced by domestically-produced algae biofuels. April 12, 2011 Beep Beep! King County, Washington Is Charging Up Savings King County uses $6.1 million to make investments that dramatically reduce

76

Bonneville Power Administration 1998 Annual Report.  

SciTech Connect

This is the 1998 annual report to the President by the Administrator and Chief Executive Officer of the Bonneville Power Administration. The topics of the report include financial highlights, letter to the President, review of 1998, financial data, management`s discussion and analysis, performance measures, financial statements, BPA executives, BPA offices, BPA profile.

United States. Bonneville Power Administration.

1998-01-01T23:59:59.000Z

77

Washington,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DC 20585 December 20, 2005 MEMORANDUM FOR THE ADMINISTRATOR, NATIONAL NUCLEAR SECURITY ADMINISTRATION CHIEF FINANCIAL OFFICER DIRECTOR, OFFICE OF MANAGEMENT FROM: William S. Maharay Deputy Inspector General for Audit Services Office of Inspector General SUBJECT: Audit Report on "Federal Managers' Financial Integrity Act" Audit Report No.: OAS-L-06-04 We reviewed selected aspects of the Department.of Energy's (Department) implementation of the Federal Managers' Financial Integrity Act (FMFIA) of 1982. FMFIA requires that agencies establish management control and financial systems to provide reasonable assurance that the integrity of Federal programs and operations is protected. Furthermore, it requires that the head of the agency provide an annual assurance statement on whether the agency has met this

78

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 6, 2012 February 6, 2012 CX-007997: Categorical Exclusion Determination Grant Consumer Power, Incorporated's Request for use of Right-of-way at Harrisburg Substation CX(s) Applied: B4.9 Date: 02/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration February 2, 2012 CX-007999: Categorical Exclusion Determination Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 02/02/2012 Location(s): Idaho Offices(s): Bonneville Power Administration February 2, 2012 CX-007998: Categorical Exclusion Determination Integration of Stoltze Land and Lumber Biomass Generation CX(s) Applied: B1.7 Date: 02/02/2012 Location(s): Montana Offices(s): Bonneville Power Administration

79

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 7, 2013 January 7, 2013 CX-009785: Categorical Exclusion Determination Roosevelt Radio Station Emergency Generator Removal and Replacement CX(s) Applied: B1.3 Date: 01/07/2013 Location(s): Washington Offices(s): Bonneville Power Administration January 3, 2013 CX-010563: Categorical Exclusion Determination Pacific Northwest National Laboratory- Non-Wire Methods for Transmission Congestion Management Through Predictive Simulation and Optimization CX(s) Applied: B3.6 Date: 01/03/2013 Location(s): Washington, North Carolina, Illinois, Oregon Offices(s): Advanced Research Projects Agency-Energy December 27, 2012 CX-009699: Categorical Exclusion Determination Continuation of Yakama Nation Sturgeon Management Project CX(s) Applied: B1.20 Date: 12/27/2012 Location(s): Washington, Washington

80

Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 5, 2011 December 5, 2011 MEMORANDUM FOR SECRETARIAL OFFICERS AND HEADS OF FIELD ORGANIZATIONS FROM: SUBJECT: !~::o~~~ral Cou;;(} '/-- Reminder Regarding Annual National Environmental Policy Act (NEP A) Planning Summaries Early involvement by senior management in the NEP A planning process is a key component of a successful NEP A compliance program. Thus, Department of Energy (DOE) Order 451.1 B requires that each Secretarial Officer and Head of a Field Organization submit an annual NEP A planning summary to the General Counsel by January 31 of each year and make it available to the public. Preparation of these summaries helps ensure that NEP A activities are aligned with program priorities and that resources are allocated to enable timely completion ofNEPA

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Distribution: Sonya Baskerville, Liaison, Bonneville Power Administration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11, 2013 11, 2013 Distribution: Sonya Baskerville, Liaison, Bonneville Power Administration Karen Boardman, Health Safety and Security, Director, National Training Center Wayne Elias, Fossil Energy, Director, FE-42 Gordon Fox, Office of Science, Director, SC-31.2 Mark Gilbertson, Environmental Management, DAS, Site Restoration Larry Harp, Division of Engineering and Planning, South Western Power Administration Joshua Hill, Federal Energy Regulatory Commission, Acting Director, Logistics Mgmt. Div. Doug Hooker, Energy Efficiency and Renewable Energy, Director, GO-OMA Mary McCune, Nuclear Energy, Director, Office of Facilities Management Peter O'Konski, Office of Management, Director, Office of Administration Jessica Schwersenska, Naval Reactors Laboratory Field Office, Analyst

82

EA-1693: Transmission Services Facility, Clark County, Washington |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Transmission Services Facility, Clark County, Washington 3: Transmission Services Facility, Clark County, Washington EA-1693: Transmission Services Facility, Clark County, Washington Summary DOE will prepare an EA to evaluate the potential environmental impacts from the proposed three-to-five story office building that would be constructed to meet the Leadership in Energy and Environmental Design (LEED) Gold standard in energy efficiency and sustainability, near Bonneville Power Administration's (BPA) existing Dittmer Building. BPA website: http://efw.bpa.gov/environmental_services/Document_Library/TSF_Project/ For more information, contact: Stephanie Breeden Environmental Project Manager Bonneville Power Administration - KEC-4 P.O. Box 3621 Portland, Oregon, 97208-3621 Direct telephone number 503-230-5192 Toll-free telephone number 1-800-282-3713

83

Energy Crossroads: Utility Energy Efficiency Programs Washington...  

NLE Websites -- All DOE Office Websites (Extended Search)

Washington Energy Crossroads Index Utility Energy Efficiency Programs Index Suggest a Listing Puget Sound Energy Information for Businesses Bonneville Power Administration...

84

Bonneville Power Administration (Bpa) Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1994/01_cover.html[6/27/2011 11:57:49 AM] 1994/01_cover.html[6/27/2011 11:57:49 AM] Final Environmental Impact Statement (DOE/eis-0194) Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Title of Proposed Action: Tenaska Washington II Generation Project State Involved: Washington Abstract: BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson

85

EA-1096: Washington Wildlife Mitigation Projects (Programmatic), Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Washington Wildlife Mitigation Projects (Programmatic), 6: Washington Wildlife Mitigation Projects (Programmatic), Washington EA-1096: Washington Wildlife Mitigation Projects (Programmatic), Washington SUMMARY This EA evaluates the environmental impacts of the proposal for the U.S. Department of Energy Bonneville Power Administration to fund the portion of the Washington Wildlife Mitigation Agreement pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD July 30, 1996 EA-1096: Finding of No Significant Impact Washington Wildlife Mitigation Projects (Programmatic) July 30, 1996 EA-1096: Final Environmental Assessment Washington Wildlife Mitigation Projects (Programmatic)

86

DOE Names Bill Drummond As New Bonneville Power Administration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Names Bill Drummond As New Bonneville Power Administration Names Bill Drummond As New Bonneville Power Administration Administrator DOE Names Bill Drummond As New Bonneville Power Administration Administrator January 16, 2013 - 7:00pm Addthis News Media Contact (202) 586-4940 WASHINGTON - The Energy Department has chosen Bill Drummond to be the new Administrator for the Bonneville Power Administration (BPA), one of the four Power Marketing Administrations (PMAs) the Department oversees. As BPA's Administrator, Drummond will be responsible for managing the non-profit federal agency, which markets carbon-free power from Columbia River hydroelectic dams and operates the surrounding power grid, distributing wind, nuclear and other energy to the Pacific Northwest and beyond. Drummond's leadership of BPA is part of a larger strategy for

87

BERAC Meeting November 3-4, 2004 Washington, DC | U.S. DOE Office...  

Office of Science (SC) Website

3-4, 2004 Washington, DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges Reports Charter...

88

Washington DC Regions | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Washington DC Regions Washington DC Regions National Science Bowl® (NSB) NSB Home About High School Middle School Middle School Students Middle School Coaches Middle School Regionals Middle School Rules, Forms, and Resources Attending National Event Volunteers 2013 Competition Results News Media WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: 202-586-6702 E: National.Science.Bowl@science.doe.gov Middle School Regionals Washington DC Regions Print Text Size: A A A RSS Feeds FeedbackShare Page Washington, DC Coaches can review the middle school regional locations listed below. Please note: Registrations are based on the location of your school. Please be sure to select the regional that is designated for your

89

Washington DC Regions | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Washington DC Regions Washington DC Regions National Science Bowl® (NSB) NSB Home About High School High School Students High School Coaches High School Regionals High School Rules, Forms, and Resources Middle School Attending National Event Volunteers 2013 Competition Results News Media WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: 202-586-6702 E: National.Science.Bowl@science.doe.gov High School Regionals Washington DC Regions Print Text Size: A A A RSS Feeds FeedbackShare Page Washington, DC Coaches can review the high school regional locations listed below. Please note: Registrations are based on the location of your school. Please be sure to select the regional that is designated for your

90

BERAC Meeting December 5-6, 2005 Washington, DC| U.S. DOE Office of Science  

Office of Science (SC) Website

5-6, 2005 Washington, DC 5-6, 2005 Washington, DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting December 5-6, 2005 Washington, DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting December 5-6, 2005 Washington, DC Agenda .pdf file (14KB) Presentations Mike Kuperberg .ppt file (68KB) and Andy Felmy .ppt file (9.8MB), EMSL Update: Reviews, Action Plan & Progress Ari Patrinos .ppt file (80KB), State of BER Warren Washington .ppt file (152KB), Discussion of the TCCRP subcommittee Report George Sgouros .pdf file (42KB), SNM, Public Comment Dan Hitchcock .ppt file (848KB), Dinner Talk, High Performance Computing

91

BERAC Meeting April 30 - May 1, 2003 Washington DC | U.S. DOE Office of  

Office of Science (SC) Website

30 - May 1, 2003 Washington DC 30 - May 1, 2003 Washington DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting April 30 - May 1, 2003 Washington DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting April 30 - May 1, 2003 Washington, DC Agenda .pdf file (8KB) Presentations Teresa Fryberger .ppt file (5.9MB), Director, Environmental Remediation Sciences Division, Division and Draft Strategic Plan Overview Anna Palmisano .ppt file (16.6MB), Natural and Accelerated Bioremediation Research Program Update Roland Hirsch .ppt file (740KB), Environmental Management Science Program Bill Rogers .ppt file (10.6MB), Environmental Molecular Sciences

92

BERAC Meeting December 3-4, 2002 Washington, DC | U.S. DOE Office of  

Office of Science (SC) Website

3-4, 2002 Washington, DC 3-4, 2002 Washington, DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting December 3-4, 2002 Washington, DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting December 3-4, 2002 Washington, DC Agenda .pdf file (6KB) Presentations Genomes to Life Facilities Marvin Frazier, DOE .ppt file (5.0MB), User Facilities for 21st Century Systems Biology Eric Ackerman, PNNL .ppt file (1.9MB), Facility I: Production and Characterization of Proteins Michelle Buchanan, ORNL .ppt file (4.3MB), Facility II: Whole Proteome Analysis Lee Makowski, ANL .ppt file (8.5MB), Characterization and Imaging of

93

BERAC Meeting July 10-11, 2006 Washington, DC | U.S. DOE Office of Science  

Office of Science (SC) Website

July 10-11, 2006 Washington, DC July 10-11, 2006 Washington, DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting July 10-11, 2006 Washington, DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting July 10-11, 2006 Washington, DC Agenda .pdf file (14KB) Presentations James Tiedje .ppt file (123KB), Discussion of Final Report of the BERAC Review of the JGI Jim Bristow .ppt file (2.8MB), JGI, Progress in addressing BERAC Recommendations Jeff Gaffney .pdf file (6.6MB), ANL, Reconfigured Atmospheric Science Program and the 2006 Mexico City Campaign David Thomassen .ppt file (119KB), State of BER Mike Kuperberg .ppt file (9.8MB), Introduction to EMSL

94

BERAC Meeting November 29-30, 2007 Washington, DC | U.S. DOE Office of  

Office of Science (SC) Website

November 29-30, 2007 Washington, DC November 29-30, 2007 Washington, DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting November 29-30, 2007 Washington, DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting November 29-30, 2007 Washington, DC Agenda .pdf file (9KB) Presentations BER Updates on BERAC Reports Jeff Amthor .ppt file (11.5MB), Free Air Carbon Dioxide Enrichment (FACE) Report Bob Vallario .ppt file (749KB), Integrated Assessment Program Report David Thomassen .ppt file (651KB), Climate Change Committee of Visitors Report Update on BERAC Charges Jim Adelstein .ppt file (785KB), Low Dose Program Review

95

BERAC Meeting November 13-14, 2003 Washington, DC | U.S. DOE Office of  

Office of Science (SC) Website

13-14, 2003 Washington, DC 13-14, 2003 Washington, DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting November 13-14, 2003 Washington, DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting November 13-14, 2003 Washington, DC Agenda .pdf file (12KB) Presentations Mark Humayun .ppt file (8.4MB), The Artificial Retina Project Chris Stubbs .ppt file (10.7MB), Computational Aspects of Medical Imaging Pat Dehmer .ppt file (34.2MB), Nanoscience and Hydrogen Initiatives Jim Mahoney .ppt file (761KB), The U.S. Climate Change Science Program: Strategic Planning to Implementation David Conover .ppt file (573KB), U.S. Climate Change Technology Program

96

BERAC Meeting April 20-21, 2005 Washington DC | U.S. DOE Office of Science  

Office of Science (SC) Website

April 20-21, 2005 Washington DC April 20-21, 2005 Washington DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting April 20-21, 2005 Washington DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting April 20-21, 2005 Washington DC Agenda .pdf file (15KB) Presentations Ray Orbach .ppt file (134KB), Advancing Energy, Economic and National Security... Dave Bader .ppt file (36KB), Subcommittee Report on the Need for Enhanced Research on Cloud Parameterization Methods... Peter Lunn .ppt file (215KB), Status Report on Restructuring of Aerosol Research Program Jerry Elwood .ppt file (552KB), New Charge to Review Terrestrial Carbon

97

BERAC Meeting April 29-30, 2004 Washington DC | U.S. DOE Office of Science  

Office of Science (SC) Website

29-30, 2004 Washington DC 29-30, 2004 Washington DC Biological and Environmental Research Advisory Committee (BERAC) BERAC Home Meetings BERAC Minutes BERAC Minutes Archive Members Charges/Reports Charter .pdf file (40KB) BER Committees of Visitors BER Home Meetings BERAC Meeting April 29-30, 2004 Washington DC Print Text Size: A A A RSS Feeds FeedbackShare Page BERAC Meeting April 29-30, 2004 Washington, DC Agenda .pdf file (15KB) Presentations Ray Orbach .ppt file (1.5MB) Ari Patrinos .ppt file (72.2MB), The State of BER Jill Banfield .ppt file (20.5MB), Structure, Reactivity, and Behavior of Nanoparticles in the Environment Steve Larson .ppt file (420KB), Radiopharmaceutical Subcommittee Report Joel Parriott/Bill Valdez .ppt file (710KB), Program Plans and Program Assessment Rating Tool (PART) Roadmaps

98

DOE - Office of Legacy Management -- University of Washington - WA 0-01  

Office of Legacy Management (LM)

Washington - WA 0-01 Washington - WA 0-01 FUSRAP Considered Sites Site: UNIVERSITY OF WASHINGTON (WA.0-01) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Seattle , Washington WA.0-01-1 Evaluation Year: 1987 WA.0-01-1 Site Operations: Research activities involving small quantities of radioactive materials in a controlled environment. WA.0-01-1 Site Disposition: Eliminated - Potential for residual radioactive contamination considered remote - Operating under active NRC license WA.0-01-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: None Indicated WA.0-01-1 Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP Also see

99

COMMENTS OF THE BONNEVILLE POWER ADMINISTRATION  

U.S. Energy Information Administration (EIA)

Page 2 BONNEVILLES COMMENTS ON FORM EIA-930 II. Comments A. The Proposed Collection is not Necessary for Proper Performance of EIA Functions,

100

Bonneville Power Administration Yakima Fisheries Project; 13Sept1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION YAKIMA FISHERIES PROJECT (YFP) RECORD OF DECISION Summary. As Administrator of the Bonneville Power Administration (BPA), I have decided to implement Alternative 2 of the proposed Yakima Fisheries Project (YFP) to undertake fishery research and mitigation activities in the Yakima River Basin in south- central Washington. The project responds directly to a need for knowledge of viable means to rebuild and maintain naturally spawning anadromous fish stocks in the Yakima Basin. Alternative 2 would experimentally supplement depressed populations of upper Yakima spring chinook salmon that spawn naturally, as well as undertake a study to determine the feasibility of re-establishing a naturally spawning population and significant fall fishery for coho salmon (now eliminated in the Basin).

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Review of Allegations Regarding Prohibited Personnel Practices at the Bonneville Power Administration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Special Inquiry Report Review of Allegations Regarding Prohibited Personnel Practices at the Bonneville Power Administration DOE/IG-0895 October 2013 Department of Energy Washington, DC 20585 October 3, 2013 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Special Inquiry: "Review of Allegations Regarding Prohibited Personnel Practices at the Bonneville Power Administration" BACKGROUND The Department of Energy's Bonneville Power Administration (Bonneville) is a self-funding entity that covers its costs by marketing wholesale electrical power from 31 Federal hydro projects. It is responsible for operating and maintaining about three-fourths of the high-voltage transmission in the Pacific Northwest. Bonneville's 3,100 employees represent 20 percent of the

102

Washington: Washington's Clean Energy Resources and Economy (Brochure)  

SciTech Connect

This document highlights the Office of Energy Efficiency and Renewable Energy's investments and impacts in the state of Washington.

Not Available

2013-03-01T23:59:59.000Z

103

Land Record System PIA, Bonneville Power Administration | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record...

104

2013 Annual Planning Summary for the Bonneville Power Administration...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Administration 2013 Annual Planning Summary for the Bonneville Power Administration 2013 Annual Planning Summary for the Bonneville Power Administration The...

105

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2011 1, 2011 CX-006066: Categorical Exclusion Determination Outdoor Tests, Experiments on Materials and Equipment Components CX(s) Applied: B3.11 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006065: Categorical Exclusion Determination Siting, Construction, Operation and Decommissioning of Microbiological and Biomedical Facilities CX(s) Applied: B3.12 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006064: Categorical Exclusion Determination Actions to Conserve Energy CX(s) Applied: B5.1 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 20, 2011 CX-006089: Categorical Exclusion Determination

106

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 26, 2010 May 26, 2010 CX-002564: Categorical Exclusion Determination FPE Renewables, LLC CX(s) Applied: B5.1 Date: 05/26/2010 Location(s): Lynden, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 26, 2010 CX-002557: Categorical Exclusion Determination G.R. Silicate CX(s) Applied: B5.1 Date: 05/26/2010 Location(s): Hoquiam, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 21, 2010 CX-002567: Categorical Exclusion Determination Harold LeMay Enterprises, Inc. CX(s) Applied: B5.1 Date: 05/21/2010 Location(s): Pierce County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 21, 2010 CX-002563: Categorical Exclusion Determination Clark Public Utilities CX(s) Applied: B5.1

107

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2010 22, 2010 CX-002030: Categorical Exclusion Determination Solar Array and Charging Stations - Administration Building/Cathcart CX(s) Applied: B5.1 Date: 04/22/2010 Location(s): Snohomish County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 22, 2010 CX-002029: Categorical Exclusion Determination Engine Generator for Enumclaw Dairy Manure Digester CX(s) Applied: B5.1 Date: 04/22/2010 Location(s): King County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 22, 2010 CX-001830: Categorical Exclusion Determination YWCA Family Village at Issaquah CX(s) Applied: B2.1, B2.5, B5.1 Date: 04/22/2010 Location(s): King county, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

108

Microsoft Word - CX-NorthBonneville-MidwayInsulatorRep_FY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2013 6, 2013 REPLY TO ATTN OF: KEP-Celilo SUBJECT: Environmental Clearance Memorandum Scott Williams Line Foreman III - TFDF-The Dalles Proposed Action: Insulator replacement on Bonneville Power Administration's (BPA) North Bonneville-Midway No. 1 transmission line PP&A Project No.: 2705 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Skamania County, Washington Line Corridor Structures TRS County, State N. Bonneville - Midway No. 1 1/1 to 10/1 2N, 7E, Sections 3, 7, 9, 16, 39 3N, 7E, Sections 25, 35, 36 3N, 8E, Sections 28, 29, 30 Skamania, Washington Proposed by: BPA Description of the Proposed Action: In order to provide continued system reliability, BPA

109

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 17, 2010 December 17, 2010 CX-004835: Categorical Exclusion Determination Electric Vehicle Charging Stations City of Mill Creek CX(s) Applied: B5.1 Date: 12/17/2010 Location(s): Mill Creek, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office December 16, 2010 CX-004691: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 12/16/2010 Location(s): Kirkland, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory December 16, 2010 CX-004836: Categorical Exclusion Determination Marine and Hydrokinetic Technology Readiness Advancement Initiative CX(s) Applied: A9, B3.6 Date: 12/16/2010 Location(s): Lynnwood, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

110

Information System Development Practices at the Bonneville and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information System Development Practices at the Bonneville and Western Area Power Administrations, IG-0586 Information System Development Practices at the Bonneville and Western...

111

Bonneville Power Administration Notice of Availability of Record...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

169 Thursday, August 31, 1995 Notices Bonneville Power Administration Notice of Availability of Record of Decision for the Business Plan AGENCY: Bonneville Power Administration...

112

PP-10-1 Bonneville Power Administrator | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

border. PP-10-1 Bonneville Power Administrator More Documents & Publications PP-10 Bonneville Power Administrator PP-30 New York Power Authority PP-305 Montana Alberta Tie Ltd...

113

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 30, 2009 September 30, 2009 CX-000477: Categorical Exclusion Determination Install a Photovoltaic Power Generation Array and Electric Car Charging Stations, Environmental Molecular Sciences Laboratory CX(s) Applied: B1.15 Date: 09/30/2009 Location(s): Richland, Washington Office(s): Science, Pacific Northwest Site Office September 23, 2009 CX-000476: Categorical Exclusion Determination 331 Building Irrigation Upgrades, 300 Area CX(s) Applied: B2.5 Date: 09/23/2009 Location(s): Richland, Washington Office(s): Science, Pacific Northwest Site Office September 16, 2009 EIS-0183: DOE Notice of Availability of the Record of Decision Electrical Interconnection of the Kittitas Valley Wind Project September 15, 2009 EIS-0312: Record of Decision Washington-Action Agency Estuary Habitat Memorandum of Agreement

114

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16, 2010 16, 2010 CX-003457: Categorical Exclusion Determination Sidewall Coring of Single-Shell Tank 241-A-106 CX(s) Applied: A9, B3.1, B3.11 Date: 08/16/2010 Location(s): Richland, Washington Office(s): Environmental Management, Office of River Protection-Richland Office August 13, 2010 CX-004960: Categorical Exclusion Determination Boeing Research and Technology -Low-Cost, High-Energy Density Flywheel Storage Grid CX(s) Applied: B3.6 Date: 08/13/2010 Location(s): Kent, Washington Office(s): Advanced Research Projects Agency - Energy August 12, 2010 CX-003624: Categorical Exclusion Determination Replacement of Twenty 22-L Structures on the Satsop-Aberdeen Number 2 230-kilovolt Transmission Line CX(s) Applied: B1.3 Date: 08/12/2010 Location(s): Gray's Harbor County, Washington

115

Department of Energy Bonneville Power Administration  

E-Print Network (OSTI)

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 Biological Opinions. Sincerely, Robert J. Austin Deputy Director for Fish and Wildlife Enclosures (2) cc: Mr

116

Department of Energy Bonneville Power Administration  

E-Print Network (OSTI)

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 or Bob Austin (503-230-4748) if you have questions about this letter or our analysis. Sincerely, William

117

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement Statement DOE/EIS-0285 Arrow-leaf Balsamroot Cooperating Agencies Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (DOE/EIS-0285) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy Cooperating Agencies: U.S. Forest Service (FS), U.S. Department of Agriculture; Bureau of Land Management (BLM), U.S. Department of Interior Title of Proposed Action: Transmission System Vegetation Management Program States Involved: California, Idaho, Montana, Oregon, Utah, Washington, and Wyoming Abstract: Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation.

118

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 30, 2010 September 30, 2010 CX-004092: Categorical Exclusion Determination Advanced Energy Efficient Building Technologies for High Performance Hospitals CX(s) Applied: A9 Date: 09/30/2010 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory September 30, 2010 CX-004074: Categorical Exclusion Determination Cascade Community Wind Mid Scale Wind Turbines CX(s) Applied: A9, B5.1 Date: 09/30/2010 Location(s): Kittitas County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office September 29, 2010 CX-004145: Categorical Exclusion Determination Advanced Low Energy Enzyme Catalyzed Solvent for Carbon Dioxide Capture CX(s) Applied: A9, B3.6 Date: 09/29/2010 Location(s): Richland, Washington

119

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 18, 2009 November 18, 2009 CX-000195: Categorical Exclusion Determination Washington County Pierce CX(s) Applied: A9, A11, B5.1 Date: 11/18/2009 Location(s): Pierce County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 12, 2009 CX-000376: Categorical Exclusion Determination Boise White Paper Mill Carbon Capture and Sequestration CX(s) Applied: A1, A9, B3.1, B3.6 Date: 11/12/2009 Location(s): Richland, Washington Office(s): Fossil Energy, National Energy Technology Laboratory November 4, 2009 Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4 cents per kWh - Without New Dams $30.6 million Recovery Act investment by the Department of Energy highlights the additional potential of hydro power November 2, 2009

120

Microsoft Word - NEPA_CX_WSDOT_LURR_No_20080504_SALE_North_Bonneville-Ross_ROW.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dawneen Dostert Dawneen Dostert Project Manager - TERR-LMT Proposed Action: Proposed Sale of Bonneville Power Administration (BPA) Fee Owned Property to Washington State Department of Transportation (WSDOT) for Interstate On and Off Ramps Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers Location: Vancouver, Clark County, WA, Township 2 North, Range 2 East, Section 28 and 21, Willamette Meridian Proposed by: Bonneville Power Adminitstration (BPA) Description of the Proposed Action: In response to a Land Use Review Request (LURR 20080504), BPA proposes to sell in fee 2.3 acres of land, located in Clark County, Washington, to WSDOT. The land consists of two strips within a residential area, located on either side of

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Bonneville Power Administration Fish & Wildlife Implementation Plan Final EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: 1: Environmental Analyses DOE/EIS-0312 April 2003 Fish and Wildlife Implementation Plan Final Environmental Impact Statement (DOE/EIS-0312) Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Title of Proposed Action: Fish and Wildlife Implementation Plan States and Provinces Involved: Arizona, California, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, Wyoming, and British Columbia Abstract: Despite the efforts of BPA and other regional entities in the Pacific Northwest, some populations of fish and wildlife continue to decline. Reasons for the lack of success include the following: different groups have different values and priorities; there is no clear and agreed-upon scientific answer; and there are conflicting

122

Pressurization test results: Bonneville Power Administration Energy Conservation Study  

SciTech Connect

Results are presented of air leakage measurements in 18 single-family detached houses at the Midway substation, Hanford, Washington, performed as part of the Bonneville Power Administration's Energy Conservation Study. The change in energy consumption following various retrofit strategies is compared. Air leakage was measured in each house with the fan pressurization technique, before and after the retrofits were installed. No significant change was found in infiltration rates in those houses receiving either no retrofits or insulation only; and average reduction of 17% in leakage area was found in the houses retrofitted with storm doors and windows. There appears to be great potential for further savings in energy use from reduced infiltration, and the study is being extended to investigate this.

Krinkel, D.L.; Dickeroff, D.J.; Casey, J.; Grimsrud, D.T.

1980-12-01T23:59:59.000Z

123

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 1, 2002 March 1, 2002 EIS-0333: Draft Environmental Impact Statement Bonneville Power Administration, Benton County, Washington March 1, 2002 EA-1405: Final Environmental Assessment Transuranic Waste Retrieval from the 218-W-4B and 218-W-4C Low-Level Burial Grounds, Hanford Site, Richland, Washington February 27, 2002 EIS-0183: DOE Notice of Availability of the Record of Decision Mint Farm Generation Project February 27, 2002 EIS-0285-SA-46: Supplement Analysis Transmission System Vegetation Management Program February 27, 2002 EIS-0285-SA-45: Supplement Analysis Transmission System Vegetation Management Program February 15, 2002 EIS-0285-SA-42: Supplement Analysis Transmission System Vegetation Management Program February 1, 2002 EIS-0332: Draft Environmental Impact Statement

124

Testimony by J. William Currie, Ph.D Manager, Energy Systems Modernization Office, Battelle, Pacific Northwest Laboratories before The Senate Committee on Governmental Affairs Washington D.C.  

Science Conference Proceedings (OSTI)

This report consists of the testimony by J. William Currie, Manager, Energy Systems Modernization Office, Battelle, Pacific Northwest Laboratories before The Senate Committee on Governmental Affairs, Washington, DC on February 18, 1992. He states ``It is a pleasure to have the opportunity to talk with this distinguished committee about energy conservation technologies and policies, especially as they relate to federal energy use and the commercialization of energy-efficiency technologies. Clearly, using energy more efficiently offers the potential for tremendous cost savings and environmental benefits in the United States and throughout the rest of the world. The challenge, especially with regard to the federal sector, is to lay the foundation for ensuring that the citizens of our nation realize the maximum savings and environmental benefit over the long run. This is the primary focus of my comments today.``

Currie, J.W.

1992-02-18T23:59:59.000Z

125

Testimony by J. William Currie, Ph. D Manager, Energy Systems Modernization Office, Battelle, Pacific Northwest Laboratories before The Senate Committee on Governmental Affairs Washington D. C  

SciTech Connect

This report consists of the testimony by J. William Currie, Manager, Energy Systems Modernization Office, Battelle, Pacific Northwest Laboratories before The Senate Committee on Governmental Affairs, Washington, DC on February 18, 1992. He states It is a pleasure to have the opportunity to talk with this distinguished committee about energy conservation technologies and policies, especially as they relate to federal energy use and the commercialization of energy-efficiency technologies. Clearly, using energy more efficiently offers the potential for tremendous cost savings and environmental benefits in the United States and throughout the rest of the world. The challenge, especially with regard to the federal sector, is to lay the foundation for ensuring that the citizens of our nation realize the maximum savings and environmental benefit over the long run. This is the primary focus of my comments today.''

Currie, J.W.

1992-02-18T23:59:59.000Z

126

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2011 2, 2011 EA-1858: Mitigation Action Plan Nippon Paper Industries USA Company Biomass Cogeneration Project May 1, 2011 EA-1679: Preliminary Environmental Assessment Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington April 28, 2011 CX-005892: Categorical Exclusion Determination Columbia River Inter-Tidal Fish Commission Use of White Bluffs Boat Launch and Hanford Town Boat Ramp for Salmon Tagging CX(s) Applied: B3.8 Date: 04/28/2011 Location(s): Richland, Washington Office(s): Environmental Management, Office of River Protection-Richland Office April 26, 2011 CX-005891: Categorical Exclusion Determination 200 Area Tank Farm Interim Surface Barriers CX(s) Applied: B6.9 Date: 04/26/2011 Location(s): Richland, Washington

127

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States » Washington United States » Washington Washington December 24, 2013 The concrete "core" is removed from Tank C-105 after workers cut a 55-inch hole in the tank dome. Cleanup Progresses at the Office of River Protection RICHLAND, Wash. - EM's Office of River Protection's (ORP) mission continues: to retrieve, treat and dispose of the 56 million gallons of radioactive and chemical waste stored in large, underground tanks. In 2013, ORP maintained steady progress toward the successful completion of its mission. December 24, 2013 Workers sample a well used to monitor groundwater at the Hanford site. EM's Richland Operations Office Celebrates Disposal Achievement in 2013 RICHLAND, Wash. - EM's Richland Operations Office's 2013 accomplishments ranged from cleaning up buildings and waste sites to treating a record

128

Department of Energy Bonneville Power Administration  

E-Print Network (OSTI)

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208. Delwiche ­ KE-4 J. Stier ­ KE-4 R. Austin ­ KEW-4 G. Dondlinger ­ KEWB-4 P. Lofy ­ KEWL-4 P. Krueger ­ KEWR

129

Bonneville Power Administration 1991 Annual Report.  

SciTech Connect

Congress enacted the Bonneville Project Act in 1937, creating the Bonneville Power Administration to market and transmit the power produced by Bonneville Dam on the Columbia River. Since then, Congress has directed BPA to sell at wholesale the power produced at a total of 30 Federal dams in the Pacific Northwest, and to acquire conservation and generating resources sufficient to meet the needs of BPA`s customer utilities. The dams and the electrical system are known as the Federal Columbia River Power System. Bonneville sells wholesale power to public and private utilities, rural cooperatives, large industries, and Federal agencies. BPA also sells or exchanges power with utilities in California. BPA uses revenues from the sale of power and transmission services to recover its own expenses, to repay the Federal investment in the power system, and to pay for the resources it has acquired. BPA pays for operation and maintenance expenses at the Federal dams and at non-Federal power plants. It also pays for irrigation benefits of Federal projects allocated to power to repay, and for fish and wildlife projects which offset damage to these resources by the Federal hydropower system. This document is the 1991 statement of budget, financial statement, cash flows, capitalization, expenses, and projects. An organization chart is included.

United States. Bonneville Power Administration.

1992-01-01T23:59:59.000Z

130

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2011 9, 2011 Department of Energy Announces $39 Million to Strengthen University-Led Nuclear Energy Research and Development 51 Projects Aim to Cut Carbon Pollution, Create Clean Energy Jobs and Strengthen America's Nuclear Energy Industry August 9, 2011 CX-006474: Categorical Exclusion Determination Biodiesel Crusher and Dryer Facility Upgrades CX(s) Applied: B5.1 Date: 08/09/2011 Location(s): Snohomish County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 8, 2011 CX-006463: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 08/08/2011 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 8, 2011

131

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 14, 2012 December 14, 2012 CX-009689: Categorical Exclusion Determination Washington River Protection Solutions LLC - Disconnection of Utilities CX(s) Applied: B1.27 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 14, 2012 CX-009672: Categorical Exclusion Determination Washington River Protection Solutions LLC - Relocation of Buildings CX(s) Applied: B1.22 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 14, 2012 CX-009671: Categorical Exclusion Determination Washington River Protection Solutions LLC - Demolition and Disposal of Buildings CX(s) Applied: B1.23 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 14, 2012

132

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 10, 2009 December 10, 2009 CX-000347: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: A1, A9, B5.1 Date: 12/10/2009 Location(s): Snohomish County, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory December 10, 2009 CX-000346: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: A1, A9 Date: 12/10/2009 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory December 7, 2009 CX-000457: Categorical Exclusion Determination Focused Site Characterization for Carbon Dioxide Storage Along a Mount Simon Sandstone Fairway in the Michigan Basin CX(s) Applied: A1, A9

133

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 13, 2012 July 13, 2012 First of Hanford's Highly Radioactive Sludge Moved Away from River RICHLAND, Wash. - Workers have started moving highly radioactive material, called sludge, awayfrom the Columbia River, marking a significant milestone in the U. S. Department of Energy (DOE)'s cleanup of the Hanford Site in Washington State. July 9, 2012 EA-1912: Draft Environmental Assessment Midway-Benton No. 1 Rebuild Project Benton County, WA July 3, 2012 EIS-0312: Record of Decision (2012) Bonneville Power Administration Administrator's Record of Decision: Columbia Basin Fish Accords Memorandum of Agreement (MOA) with the Kalispel Tribe July 3, 2012 DOE Announces Additional Tour Seats Available: Tours of B Reactor at the Hanford Site Begin and End in Richland, Wash. RICHLAND, Wash. - The U.S. Department of Energy (DOE) has made additional

134

PIA - Bonneville Power Adminstration Ethics Helpline | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Historical Records System, Office of Legacy Management iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management...

135

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 19, 2011 January 19, 2011 CX-005033: Categorical Exclusion Determination Oil Cleanup in 100-NR-2 CX(s) Applied: B6.1 Date: 01/19/2011 Location(s): Hanford, Washington Office(s): Environmental Management, Office of River Protection-Richland Office January 19, 2011 CX-005032: Categorical Exclusion Determination Waste Encapsulation and Storage Facility Ventilation System Replacement CX(s) Applied: B2.5 Date: 01/19/2011 Location(s): Hanford, Washington Office(s): Environmental Management, Office of River Protection-Richland Office January 13, 2011 CX-005034: Categorical Exclusion Determination Provide Power to Existing River Discharge and Monitoring System, 331 Facility, Hanford Site CX(s) Applied: B2.5 Date: 01/13/2011 Location(s): Hanford, Washington Office(s): Environmental Management, Office of River Protection-Richland

136

Washington Closure Hanford, LLC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 19,2010 August 19,2010 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Neil Brosee President Washington Closure Hanford, LLC 2620 Fermi Avenue Richland, Washington 99354 WEA-201 0-02 Dear Mr. Brosee: This letter refers to the Office of Health, Safety and Security's Office of Enforcement investigation into the facts and circumstances surrounding the employee fall that occurred at the Hanford High Bay Testing Facility (336 Building) on July 1, 2009. The worker sustained serious injury to his back and broke bones in both legs. Based on an evaluation of the evidence in this matter, the U.S. Department of Energy (DOE) has concluded that violations of 10 C.F.R. Part 851, Worker Safety and Health Program, by Washington Closure Hanford, LLC (WCH) occurred. Accordingly, DOE is issuing the enclosed Preliminary Notice of

137

Energy Incentive Programs, Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington Washington Energy Incentive Programs, Washington October 29, 2013 - 1:19pm Addthis Updated January 2013 Washington utilities budgeted over $180 million in 2011 to promote increased energy efficiency in the state, excluding the offerings administered by the Northwest Energy Efficiency Alliance and Bonneville Power Authority (see below). What public-purpose-funded energy efficiency programs are available in my state? Washington has no public-purpose-funded energy efficiency programs. What utility energy efficiency programs are available to me? Seattle City Light offers a variety of energy efficiency programs to commercial and industrial customers through its Energy Smart Services initiative: Free facility energy assessments are available to medium and large commercial customers in order to manage operating costs and identify energy

138

Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision (DOE/EIS-0317) (7/21/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Administration Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Kangley-Echo Lake Transmission Line Project in King County, Washington. BPA has decided to implement the Proposed Action (Alternative 1) identified in the Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0317-S1, June 2003). This decision is made thirty (30) days after publication of the notice for a final EIS (June 20, 2003) in the Federal Register. The Proposed Action consists of constructing a new 500-kilovolt (kV) transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to BPA's Echo Lake

139

Bonneville Power Administration South Oregon Coast Reinforcement Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Federal Register / Vol. 63, No. 61 / Tuesday, March 31, 1998 / Notices President of Utility Contracting, Citizens Power Sales, 160 Federal Street, Boston, Massachusetts 02110. A final decision will be made on this application after the environmental impacts have been evaluated pursuant to the National Environmental Policy Act of 1969, and a determination is made by the DOE that the proposed action will not adversely impact on the reliability of the U.S. electric power supply system. Copies of this application will be made available, upon request, for public inspection and copying at the address provided above. Issued in Washington, DC on March 24, 1998. Anthony J. Como, Manager, Electric Power Regulation, Office of Coal and Power Im/Ex, Office of Coal and Power Systems, Office of Fossil Energy.

140

EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line, Benton and Yakima Counties, Washington  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 34-mile Midway-Moxee transmission line in Benton and Yakima Counties, Washington.

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

EIS-0312: Notice of Availability of the Bonneville Power Administratio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Bonneville Power Administration Administrator's Record of Decision: Columbia Basin Fish Accords Memorandum of Agreement (MOA) with the Kalispel Tribe on Columbia Basin Fish...

142

PV integration in the Bonneville Power Administration balancing authority area.  

E-Print Network (OSTI)

??In this study I investigate the accuracy and necessity of the Bonneville Power Administration (BPA) PV integration tariff, which was instituted in 2011. Note that, (more)

Schumaker, Adam

2012-01-01T23:59:59.000Z

143

EA-1002: Bonneville Power Administration's Hot Springs- Garrison...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This EA evaluates the environmental impacts of the U.S. Department of Energy's Bonneville Power Administration's proposal to upgrade its operational telecommunications system...

144

PP-10 Bonneville Power Administrator | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. PP-10 Bonneville Power Administrator More Documents & Publications...

145

Independent Activity Report, Washington River Protection Solutions -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington River Protection Solutions Washington River Protection Solutions - September 2010 Independent Activity Report, Washington River Protection Solutions - September 2010 September 2010 Participation in the Washington River Protection Solutions, LLC Integrated Safety Management System Annual Review The U.S. Department of Energy, Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the review of the Washington River Protection Solutions, LLC Integrated Safety Management System Annual Review for 2010. The review was conducted during the period of August 23 to September 2, 2010, and focused on six functional areas: corrective action management, work planning and control, radiological protection, environmental protection, emergency preparedness, and

146

OHA Case Tracking System PIA,Office of Hearings and Appeals ...  

NLE Websites -- All DOE Office Websites (Extended Search)

PIA - Bonneville Power Adminstration Ethics Helpline iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management...

147

Washington: Washington's Clean Energy Resources and Economy (Brochure)  

SciTech Connect

This document highlights the Office of Energy Efficiency and Renewable Energy's investments and impacts in the state of Washington.

2013-03-01T23:59:59.000Z

148

EIS-0424: Klickitat Hatchery Complex Program, Washington  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the environmental impacts from DOEs Bonneville Power Administration's proposal to assist with funding the construction, operation, and maintenance of modifications to the Klickitat Hatchery and the Yakama Nations Hatchery Complex Program that intend to aid populations of anadromous fish affected by the Federal Columbia River Power System dams. The proposed action could include support for modifications to the existing hatchery, a new hatchery/acclimation facility in Wahkiacus, Washington, and an acclimation facility at McCreedy Creek in Yakima County, Washington.

149

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 26, 2010 May 26, 2010 CX-002564: Categorical Exclusion Determination FPE Renewables, LLC CX(s) Applied: B5.1 Date: 05/26/2010 Location(s): Lynden, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 26, 2010 CX-002557: Categorical Exclusion Determination G.R. Silicate CX(s) Applied: B5.1 Date: 05/26/2010 Location(s): Hoquiam, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 21, 2010 CX-002567: Categorical Exclusion Determination Harold LeMay Enterprises, Inc. CX(s) Applied: B5.1 Date: 05/21/2010 Location(s): Pierce County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 21, 2010 CX-002563: Categorical Exclusion Determination Clark Public Utilities CX(s) Applied: B5.1

150

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 30, 2009 September 30, 2009 CX-000477: Categorical Exclusion Determination Install a Photovoltaic Power Generation Array and Electric Car Charging Stations, Environmental Molecular Sciences Laboratory CX(s) Applied: B1.15 Date: 09/30/2009 Location(s): Richland, Washington Office(s): Science, Pacific Northwest Site Office September 23, 2009 CX-000476: Categorical Exclusion Determination 331 Building Irrigation Upgrades, 300 Area CX(s) Applied: B2.5 Date: 09/23/2009 Location(s): Richland, Washington Office(s): Science, Pacific Northwest Site Office August 19, 2009 CX-000470: Categorical Exclusion Determination Purgewater Storage and Treatment Facility Unit #1 Closure CX(s) Applied: B6.1 Date: 08/19/2009 Location(s): Benton County, Washington Office(s): Environmental Management, Office of River Protection-Richland

151

Bonneville Power Admin | Open Energy Information  

Open Energy Info (EERE)

Power Admin Power Admin Jump to: navigation, search Name Bonneville Power Admin Place Oregon Utility Id 1738 Utility Location Yes Ownership F NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png IP - 12 Industrial NR - 12 Industrial PF - 12 Exchange Residential PF - 12 Public - Average Tier 1 + Tier 2 rate Residential PF - 12 Public - Average Tier 1 rate Residential

152

Bonneville Environmental Foundation | Open Energy Information  

Open Energy Info (EERE)

Foundation Foundation Jump to: navigation, search Name Bonneville Environmental Foundation Address 240 SW 1st Avenue Place Portland, Oregon Zip 97204 Region Pacific Northwest Area Website https://www.b-e-f.org/ Coordinates 45.520495°, -122.671887° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.520495,"lon":-122.671887,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

153

Bonneville Power Administration's YouTube Channel  

DOE Data Explorer (OSTI)

The Bonneville Power Administration is one of DOE's four power marketing administration organizations. BPA describes its mission as a public service organization as one designed create and deliver the best value for our customers and constituents as we act in concert with others to assure the Pacific Northwest: 1) An adequate, efficient, economical and reliable power supply; 2) A transmission system that is adequate to the task of integrating and transmitting power from federal and non-federal generating units, providing service to BPA's customers, providing interregional interconnections, and maintaining electrical reliability and stability; and 3) Mitigation of the Federal Columbia River Power System's impacts on fish and wildlife. The more than 100 videos on BPA's YouTube channel are organized into 12 playlists, including: Technology R&D, Renewable Energy, Hydropower, Energy Efficiency and Conservation, Transmission, Environment, Fish, and Wildlife, Vegetation Management and Public Safety, Value of the River Education Series, and Community and Education.

154

Bonneville Project: CFD of the Spillway Tailrace  

SciTech Connect

US Army Corps of Engineers, Portland District (CENWP) operates the Bonneville Lock and Dam Project on the Columbia River. High spill flows that occurred during 2011 moved a large volume of rock from downstream of the spillway apron to the stilling basin and apron. Although 400 cubic yards of rocks were removed from the stilling basin, there are still large volumes of rock downstream of the apron that could, under certain flow conditions, move upstream into the stilling basin. CENWP is investigating operational changes that could be implemented to minimize future movement of rock into the stilling basin. A key analysis tool to develop these operational changes is a computational fluid dynamics (CFD) model of the spillway. A free-surface CFD model of the Bonneville spillway tailrace was developed and applied for four flow scenarios. These scenarios looked at the impact of flow volume and flow distribution on tailrace hydraulics. The simulation results showed that areas of upstream flow existed near the river bed downstream of the apron, on the apron, and within the stilling basin for all flows. For spill flows of 300 kcfs, the cross-stream and downstream extent of the recirculation zones along Cascade and Bradford Island was very dependent on the spill pattern. The center-loaded pattern had much larger recirculation zones than the flat or bi-modal pattern. The lower flow (200 kcfs) with a flat pattern had a very large recirculation zone that extended half way across the channel near the river bed. A single flow scenario (300 kcfs of flow in a relatively flat spill pattern) was further interrogated using Lagrangian particle tracking. The tracked particles (with size and mass) showed the upstream movement of sediments onto the concrete apron and against the vertical wall between the apron and the stilling basin from seed locations downstream of the apron and on the apron.

Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.; Romero Gomez, Pedro DJ

2012-11-19T23:59:59.000Z

155

Microsoft Word - CX-NorthBonneville-RossNorthBonneville-Troutdale_LineSwap_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2011 4, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Civil Engineer - TEP-TPP-3 Proposed Action: North Bonneville-Ross #1 230-kV, North Bonneville-Troutdale #2 230-kV transmission line maintenance Budget Information: Work Order #00246927 PP&A Project No.: PP&A 1666 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.13 Reconstruction (upgrading or rebuilding) and/or minor relocation of existing electric powerlines approximately 20 miles in length or less to enhance environmental and land use values. Such actions include relocations to avoid right-of-way encroachments, resolve conflict with property development, accommodate road/highway construction, allow for the construction of facilities

156

Washington - U.S. Energy Information Administration (EIA) - U.S ...  

U.S. Energy Information Administration (EIA)

Washington State Energy Office; ... EIA - 1000 Independence Avenue, SW, Washington, DC 20585 About EIA Press Room Careers Feedback Contact Us. Sources & Uses Petroleum

157

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 10, 2003 March 10, 2003 EIS-0330: Record of Decision Wallula-McNary Transmission Line Project and Wallula Power Project March 7, 2003 EA-1454: Finding of No Significant Impact Reactivation and Use of Three Former Borrow Sites in the 100-F,100-H, and 100-N Areas, Hanford Site, Richland, Washington March 6, 2003 EIS-0285-SA-128: Supplement Analysis Transmission System Vegetation Management Program March 3, 2003 EIS-0286: Draft Environmental Impact Statement Hanford Site Solid (Radioactive and Hazardous) Waste Program, Richland, Washington March 3, 2003 EIS-0286: Revised Draft Environmental Import Statement Richland Operations Office, Hanford Site Solid (Radioactive and Hazardous) Waste Program, Richland, Washington March 3, 2003 EA-1454: Final Environmental Assessment Reactivation and Use of Three Former Borrow Sites in the 100-F,100-H, and

158

Continuity of Operations at Bonneville Power Administration, IG-0781 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Continuity of Operations at Bonneville Power Administration, Continuity of Operations at Bonneville Power Administration, IG-0781 Continuity of Operations at Bonneville Power Administration, IG-0781 In the event of a major disruption to its nonnal operations, Bonneville must be prepared to continue its essential functions, particularly its power scheduling, tra~lsmission scheduling, and system operations. In this regard, Bonneville is required to follow Federal Preparedness Circular 65 (FPC 65), as prescribed by the Department of Homeland Security's Federal Emergency Management Agency. Under FPC 65, agencies are to develop viable contingency plans. The Circular also provides a number of key steps that agencies should take for continuity of operations. Specifically, it recommends that each agency: ( I ) prepare alternate operating facilities; (2)

159

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2011 6, 2011 CX-007504: Categorical Exclusion Determination 300 Area Nanoscale Research and Development Projects CX(s) Applied: B3.15, A9, B3.6 Date: 12/06/2011 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 1, 2011 EA-1679: Revision Sheet for Final Environmental Assessment Grand Coulee's Third Power plant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington November 18, 2011 Demolition Begins on Hanford's Historic Plutonium Vaults - Plutonium Finishing Plant on track to meet regulatory milestone RICHLAND, WASH. - The U.S. Department of Energy (DOE) and contractor CH2M HILL Plateau Remediation Company (CH2M HILL) began demolishing a vault complex that once held stores of plutonium for the U.S. nuclear weapons

160

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

24, 2011 24, 2011 Chemical engineer Alan Zacher 10 Questions for a Chemical Engineer: Alan Zacher Chemical engineer Alan Zacher took some time to share advice for students interested in science and engineering and give us the download on his work developing propylene glycol from renewable sources. March 24, 2011 CX-005523: Categorical Exclusion Determination Washington-City-Bellevue CX(s) Applied: A9, A11, B5.1 Date: 03/24/2011 Location(s): Bellevue, Washington Office(s): Energy Efficiency and Renewable Energy March 22, 2011 EIS-0245-SA-03: Supplement Analysis Determination Management of Spent Nuclear Fuel from the K Basins at the Hanford Site, Richland, WA March 22, 2011 EIS-0422: Notice of Availability of the Record of Decision Central Ferry to Lower Monumental 500-kilovolt Transmission Line Project

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 25, 2010 January 25, 2010 EIS-0391: Updated Notice of Public Hearings Tank Closure and Waste Management for the Hanford Site, Richland, WA January 13, 2010 CX-000471: Categorical Exclusion Determination Limited Prescribed Burning on the Hanford Site During October, November, and December of 2010 to Maintain Critical Fire Breaks CX(s) Applied: B1.3 Date: 01/13/2010 Location(s): Benton County, Washington Office(s): Environmental Management, Office of River Protection-Richland Office January 8, 2010 EIS-0391: Notice of Public Hearings Tank Closure and Waste Management for the Hanford Site, Richland, WA January 1, 2010 EIS-0222: Final Environmental Impact Statement Hanford Comprehensive Land-Use Plan December 18, 2009 EIS-0391: Notice of Modification of Preferred Alternatives

162

Bonneville Power Administration`s Commercial Sector Conservation Market.  

SciTech Connect

Bonneville has, as part of its resource plan, accepted targets for commercial conservation which are quite ambitious. To meet these targets, Bonneville will need to acquire as much cost-effective conservation as possible over the next twelve years. With this in mind, this document explores the relative importance of different commercial market segments and the types of assistance each market needs to install as many cost-effective conservation measures in as many buildings as possible. This document reviews Bonneville`s marketing environment and position, and suggests goals for commercial sector conservation marketing at Bonneville. Then it presents a broad market segmentation and series of additional demographic analyses. These analyses assess what groups of consumers Bonneville must reach to achieve most of the commercial conservation potential and what is needed to reach them. A final section reviews the success of Bonneville programs at reaching various markets. The market segmentation identifies different types of consumers and opportunities which would require distinct program approaches. Four large market segments are identified that have distinct program needs. Then four ``building life-cycle events`` are identified which provide important conservation opportunities and also require distinct program services. This creates a matrix of 16 cells which delineate distinct needs for program marketing. Each of the four key market segments manages at least 20% of the Region`s commercial floorspace.

Gordan, Frederick M. [Pacific Energy Associates, Inc. (United States)

1992-11-10T23:59:59.000Z

163

Bonneville Power Administration 1997 Annual Report.  

SciTech Connect

The Bonneville Power Administration`s 60th anniversary year exceeded expectations. Net revenues were the best since 1991, which demonstrates that earlier decisions to transform BPA into a smaller, cost-conscious, customer-focused organization were the correct decisions. The region`s evaluation of the agency`s role in the Northwest was as gratifying as the positive financial position. Through the Comprehensive Review of the Northwest Energy System, the region concluded that BPA has been and must continue to be an important economic and environmental benefit to the Northwest. BPA occupies a unique position in the region that is crystallized in the agency`s new purpose statement: to meet their public responsibilities through commercially successful businesses. The agency must be commercially successful to provide funding for public responsibilities such as its fish and wildlife program, conservation, and reliable power and transmission systems. But the heart and soul of the agency is providing benefits that reflect the public service orientation that inspired the agency`s creation 60 years ago. BPA will provide the region with power at cost, provide preference to the region because the river on which the hydro system is based is a regional resource, and continue to see that its power flows to the little guys. It is just as important that BPA deliver power to the region`s residential and rural consumers now as it was when the agency brought electricity to rural areas for the first time.

United States. Bonneville Power Administration.

1998-01-01T23:59:59.000Z

164

Bonneville Power Administration 1993 Annual Report.  

SciTech Connect

For the first time in a decade, Bonneville had to propose a double digit rate increase in 1993. Many of the causes were beyond our control, but self-examination and painful budget cuts put the focus squarely where it should be -- on the changes needed for BPA to compete in an increasingly market-driven business environment. As deregulation and change sweep the electricity industry, BPA has launched a major Competitiveness Project. It`s clear that we can, and will, cut costs and make ourselves more efficient. We can shape our products and services to better reflect what customers want and are willing to pay for. And more than ever we will measure and reward output -- results -- more than process. BPA today is the Northwest`s low-cost supplier of electricity and transmission services. To stay that way, we must adopt a more business-like model. The move does not signal a rejection of our role as a federal agency. In fact, close attention to sound business principles is the only way to strengthen our commitment to fish and wildlife, environment, and other community values.

United States. Bonneville Power Administration.

1994-01-01T23:59:59.000Z

165

Audit of Bonneville Power Administration's Management of Information Resources, WR-B-96-06  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIT OF BONNEVILLE POWER ADMINISTRATION'S MANAGEMENT OF INFORMATION RESOURCES The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov Department of Energy Human Resources and Administration Home Page http://www.hr.doe.gov/ig

166

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 1, 2012 February 1, 2012 CX-007984: Categorical Exclusion Determination Explosives Research Capability Expansion, 300 Area, Hanford Site CX(s) Applied: B3.6 Date: 02/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office January 30, 2012 CX-007955: Categorical Exclusion Determination Exe-Guard (Formerly Whitelist) Antivirus Project CX(s) Applied: A1, A9, A11, B1.2, B1.7 Date: 01/30/2012 Location(s): Washington Offices(s): National Energy Technology Laboratory January 27, 2012 CX-007880: Categorical Exclusion Determination Evergreen State Solar Partnership CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Washington Offices(s): Golden Field Office January 13, 2012 CX-007980: Categorical Exclusion Determination Washington River Protection Solutions LLC - Proposed Actions For Calendar

167

Bonneville Power Administration Fish & Wildlife Implementation Plan Final EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: 2: Appendices DOE/EIS-0312 April 2003 Appendix A Fish and Wildlife Funding Principles for Bonneville Power Administration Rates and Contracts Fish and Wildlife Implementation Plan EIS Appendix A: Fish and Wildlife Funding Principles Appendix A/ 1 Appendix A FISH AND WILDLIFE FUNDING PRINCIPLES FOR BONNEVILLE POWER ADMINISTRATION RATES AND CONTRACTS September 16, 1998 Preamble The purpose of these principles is to conclude the fish and wildlife funding process in which Bonneville has been engaged with various interests in the Region, and provide a set of guidelines for structuring Bonneville's subscription and power rate processes. The principles are intended to "keep the options open" for future fish and wildlife decisions that are anticipated to be made in late 1999 on reconfiguration of the hydrosystem and in

168

Bonneville Power Administration Notice of Availability of Record...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10-12-95; 8:45 am BILLING CODE 6450-01-P Bonneville Power Administration Notice of Availability of Record of Decision for Industrial Incentive Rate Sale for Idle Pacific Northwest...

169

The Skycrane at the Bonneville Power Administration | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Skycrane at the Bonneville Power Administration The Skycrane at the Bonneville Power Administration The Skycrane at the Bonneville Power Administration August 2, 2010 - 10:44am Addthis Daniel B. Poneman Daniel B. Poneman Deputy Secretary of Energy What does this project do? The project is now on schedule and under budget. The Skycrane helped overcome challenging environmental conditions. It also made the work safer for workers on the ground. The project is expected to employ approximately 140 people at its peak. For a striking glimpse of a power grid rapidly evolving to handle renewable power, look to the Bonneville Power Administration in the Pacific Northwest. Crews just finished using a Skycrane helicopter to assemble 65 steel towers for a new high-voltage transmission line to move wind power throughout the region.

170

Supplement to Administrator's Record of Decision on Bonneville Power Administration's Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011 (DOE/EIS-0183) (06/19/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

266 Federal Register 266 Federal Register / Vol. 71, No. 117 / Monday, June 19, 2006 / Notices Education, Room 5C141, 400 Maryland Avenue, SW., Washington, DC 20202. [FR Doc. 06-5528 Filed 6-16-06; 8:45 am] BILLING CODE 4000-01-M DEPARTMENT OF ENERGY Bonneville Power Administration Supplement to Administrator's Record of Decision on Bonneville Power Administration's Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011 AGENCY: Bonneville Power Administration (BPA), Department of Energy. ACTION: Notice of final policy. SUMMARY: BPA Administrator Stephen J. Wright signed a supplement to the Administrator's Record of Decision (ROD) on Bonneville Power Administration's Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011. The original

171

News From the D.C. Office: Energy-Saving Office Equipment, Part...  

NLE Websites -- All DOE Office Websites (Extended Search)

Aerial view of Washington D.C. News From the D.C. Office Energy-Saving Office Equipment, Part 1 More on the DC Office efficiency up-grade: Lighting, Office Equipment: Part 2...

172

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 21, 2011 September 21, 2011 CX-006842: Categorical Exclusion Determination Removal of the 204-AR Facility Diesel Generator and Associated Underground 550 Gallon Fuel Tank CX(s) Applied: B6.1 Date: 09/21/2011 Location(s): Richland, Washington Office(s): River Protection-Richland Operations Office September 21, 2011 CX-006842: Categorical Exclusion Determination Removal of the 204-AR Facility Diesel Generator and Associated Underground 550 Gallon Fuel Tank CX(s) Applied: B6.1 Date: 09/21/2011 Location(s): Richland, Washington Office(s): River Protection-Richland Operations Office September 20, 2011 CX-007036: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project - North Service Center CX(s) Applied: B5.1 Date: 09/20/2011 Location(s): Seattle, Washington

173

Wildlife Impact Assessment : Bonneville, McNary, The Dalles, and John Day Projects.  

DOE Green Energy (OSTI)

The Habitat Evaluation Procedures (HEP) were used to evaluate pre- and post-construction habitat conditions of the US Army Corps of Engineers Bonneville project in Oregon and Washington. The project directly impacted 20,749 acres of wildlife habitat. Seven evaluation species were selected with losses and gains expressed in Habitat Units (HU's). One HU is equivalent to 1 acre of prime habitat. The evaluation estimated a gain of 2671 HU's of lesser scaup wintering habitat. Losses of 4300 HU's of great blue heron habitat, 2443 HU's of Canada goose habitat, 2767 HU's of spotted sandpiper habitat, 163 HU's of yellow warbler habitat, 1022 HU's black-capped chickadee habitat, and 1622 HU's of mink habitat occurred as a result of the project. This amounts to a total combined loss of 12,317 HU's. 18 refs., 1 fig., 4 tabs.

Rasmussen, Larry; Wright, Patrick

1990-10-01T23:59:59.000Z

174

EIS-0419: Whistling Ridge Energy Project, Skamania County, Washington |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19: Whistling Ridge Energy Project, Skamania County, 19: Whistling Ridge Energy Project, Skamania County, Washington EIS-0419: Whistling Ridge Energy Project, Skamania County, Washington Summary This EIS evaluates the environmental impacts of a proposal to allow the electrical interconnection of Whistling Ridge Energy, LLC's proposed 75-megawatt (MW) wind project in Skamania County, Washington, to the Federal Columbia River Transmission System. DOE's Bonneville Power Administration will act as the federal lead agency under NEPA and the Washington Energy Facility Site Evaluation Council will act as the state lead agency under the Washington State Environmental Policy Act. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download August 23, 2011 EIS-0419: Final Environmental Impact Statement

175

EIS-0424: Klickitat Hatchery Complex Program, Washington | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Klickitat Hatchery Complex Program, Washington 4: Klickitat Hatchery Complex Program, Washington EIS-0424: Klickitat Hatchery Complex Program, Washington Summary This EIS evaluates the environmental impacts from DOE's Bonneville Power Administration's proposal to assist with funding the construction, operation, and maintenance of modifications to the Klickitat Hatchery and the Yakama Nation's Hatchery Complex Program that intend to aid populations of anadromous fish affected by the Federal Columbia River Power System dams. The proposed action could include support for modifications to the existing hatchery, a new hatchery/acclimation facility in Wahkiacus, Washington, and an acclimation facility at McCreedy Creek in Yakima County, Washington. Public Comment Opportunities No public comment opportunities available at this time.

176

Evaluation of Salmon Spawning Below Bonneville Dam, 2005-2006 Annual Report.  

DOE Green Energy (OSTI)

Since FY 2000, scientists at Pacific Northwest National Laboratory (PNNL) have conducted research to assess the extent of spawning by chum salmon (Oncorhynchus keta) and fall Chinook salmon (O. tshawytscha) in the lower mainstem Columbia River. Their work supports a larger project funded by the Bonneville Power Administration (BPA) aimed at characterizing the physical habitat used by mainstem fall Chinook and chum salmon populations. Multiple collaborators in addition to PNNL are involved in the BPA project--counterparts include the Washington Department of Fish and Wildlife (WDFW), U.S. Fish and Wildlife Service (USFWS), Pacific States Marine Fisheries Commission (PSMFC), U.S. Geological Survey (USGS), and Oregon Department of Fish and Wildlife (ODFW). Data resulting from the individual tasks each agency conducts are providing a sound scientific basis for developing strategies to operate the Federal Columbia River Power System (FCRPS) in ways that will effectively protect and enhance the chum and tule fall Chinook salmon populations--both listed as threatened under the Endangered Species Act (ESA). Fall Chinook salmon, thought to originate from Bonneville Hatchery, were first noted to be spawning downstream of Bonneville Dam by WDFW biologists in 1993. Known spawning areas include gravel beds on the Washington side of the river near Hamilton Creek and near Ives Island. Limited surveys of spawning ground were conducted in the area around Ives and Pierce islands from 1994 through 1997. Based on those surveys, it is believed that fall Chinook salmon are spawning successfully in this area. The size of this population from 1994 to 1996 was estimated at 1800 to 5200 fish. Chum salmon also have been documented spawning downstream of Bonneville Dam. Chum salmon were listed as threatened under the ESA in March 1999. At present there is a need to determine the number of fall Chinook and chum salmon spawning downstream of Bonneville Dam, the characteristics of their spawning areas, and the flows necessary to ensure their long-term survival. Ongoing discussions regarding the minimum and maximum flows will result in optimal spawning habitat usage and survival of embryos of both species. Collection of additional data as part of this project will ensure that established flow guidelines are appropriate and provide adequate protection for the species of concern. This is consistent with the high priority placed by the Northwest Power and Conservation Council Independent Scientific Advisory Board and the salmon managers on determining the importance of mainstem habitats to the production of salmon in the Columbia River Basin. Thus, there is a need to better understand the physical habitat variables used by mainstem fall Chinook and chum salmon populations and the effects of hydropower project operations on spawning and incubation. Pacific Northwest National Laboratory was asked to participate in the cooperative study during FY 2000. Since then, we have focused on (1) investigating the interactions between groundwater and surface water near fall Chinook and chum salmon spawning areas; (2) providing in-season hyporheic temperature data and assisting state agencies with emergence timing estimates; (3) locating and mapping deep-water fall Chinook salmon spawning areas; and (4) providing support to the WDFW for analysis of stranding data. Work conducted during FY 2006 addressed these same efforts. This report documents the studies and tasks performed by PNNL during FY 2006. Chapter 1 provides a description of the searches conducted for deepwater redds--adjacent to Pierce and Ives islands for fall Chinook salmon and near the Interstate 205 bridge for chum salmon. The chapter also provides data on redd location, information about habitat associations, and estimates of total spawning populations. Chapter 2 documents the collection of data on riverbed and river temperatures and water surface elevations, from the onset of spawning to the end of emergence, and the provision of those data in-season to fisheries management agencies to assist with emer

Arntzen, Evan; Mueller, Robert; Murray, Christopher [Pacific Northwest National Laboratory

2007-03-01T23:59:59.000Z

177

Evaluation of Salmon Spawning Below Bonneville Dam, Annual Report October 2005 - September 2006.  

DOE Green Energy (OSTI)

Since FY 2000, scientists at Pacific Northwest National Laboratory (PNNL) have conducted research to assess the extent of spawning by chum salmon (Oncorhynchus keta) and fall Chinook salmon (O. tshawytscha) in the lower mainstem Columbia River. Their work supports a larger project funded by the Bonneville Power Administration (BPA) aimed at characterizing the physical habitat used by mainstem fall Chinook and chum salmon populations. Multiple collaborators in addition to PNNL are involved in the BPA project--counterparts include the Washington Department of Fish and Wildlife (WDFW), U.S. Fish and Wildlife Service (USFWS), Pacific States Marine Fisheries Commission (PSMFC), U.S. Geological Survey (USGS), and Oregon Department of Fish and Wildlife (ODFW). Data resulting from the individual tasks each agency conducts are providing a sound scientific basis for developing strategies to operate the Federal Columbia River Power System (FCRPS) in ways that will effectively protect and enhance the chum and tule fall Chinook salmon populations--both listed as threatened under the Endangered Species Act (ESA). Fall Chinook salmon, thought to originate from Bonneville Hatchery, were first noted to be spawning downstream of Bonneville Dam by WDFW biologists in 1993. Known spawning areas include gravel beds on the Washington side of the river near Hamilton Creek and near Ives Island. Limited surveys of spawning ground were conducted in the area around Ives and Pierce islands from 1994 through 1997. Based on those surveys, it is believed that fall Chinook salmon are spawning successfully in this area. The size of this population from 1994 to 1996 was estimated at 1800 to 5200 fish. Chum salmon also have been documented spawning downstream of Bonneville Dam. Chum salmon were listed as threatened under the ESA in March 1999. At present there is a need to determine the number of fall Chinook and chum salmon spawning downstream of Bonneville Dam, the characteristics of their spawning areas, and the flows necessary to ensure their long-term survival. Ongoing discussions regarding the minimum and maximum flows will result in optimal spawning habitat usage and survival of embryos of both species. Collection of additional data as part of this project will ensure that established flow guidelines are appropriate and provide adequate protection for the species of concern. This is consistent with the high priority placed by the Northwest Power and Conservation Council Independent Scientific Advisory Board and the salmon managers on determining the importance of mainstem habitats to the production of salmon in the Columbia River Basin. Thus, there is a need to better understand the physical habitat variables used by mainstem fall Chinook and chum salmon populations and the effects of hydropower project operations on spawning and incubation. Pacific Northwest National Laboratory was asked to participate in the cooperative study during FY 2000. Since then, we have focused on (1) investigating the interactions between groundwater and surface water near fall Chinook and chum salmon spawning areas; (2) providing in-season hyporheic temperature data and assisting state agencies with emergence timing estimates; (3) locating and mapping deep-water fall Chinook salmon spawning areas; and (4) providing support to the WDFW for analysis of stranding data. Work conducted during FY 2006 addressed these same efforts. This report documents the studies and tasks performed by PNNL during FY 2006. Chapter 1 provides a description of the searches conducted for deepwater redds--adjacent to Pierce and Ives islands for fall Chinook salmon and near the Interstate 205 bridge for chum salmon. The chapter also provides data on redd location, information about habitat associations, and estimates of total spawning populations. Chapter 2 documents the collection of data on riverbed and river temperatures and water surface elevations, from the onset of spawning to the end of emergence, and the provision of those data in-season to fisheries management agencies to assist with emer

Arntzen, Evan V.; Mueller, Robert P.; Murray, Christopher J. [Pacific Northwest National Laboratory

2007-09-21T23:59:59.000Z

178

Bonneville Power Administration Fish and Wildlife Implementation Plan, October 23, 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

488 488 Federal Register / Vol. 64, No. 202 / Wednesday, October 20, 1999 / Notices DEPARTMENT OF COMMERCE Patent and Trademark Office Performance Review Board AGENCY: Patent and Trademark Office, Commerce. ACTION: Announcement of membership of the Patent and Trademark Office Performance Review Board. SUMMARY: In conformance with the Civil Service Reform Act of 1978, 5 U.S.C. 4314(c)(4), the Patent and Trademark Office announces the appointment of persons to serve as members of its Performance Review Board. ADDRESSES: Comments should be addressed to Director, Office of Human Resources, Patent and Trademark Office, One Crystal Park, Suite 707, Washington, DC 20231. FOR FURTHER INFORMATION CONTACT: Alethea Long-Green at the above address or telephone (703) 305-8062. SUPPLEMENTARY

179

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2011 1, 2011 CX-005337: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 03/01/2011 Location(s): Redmond, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory February 24, 2011 Online Registration Dates Set for 2011 Hanford Tours RICHLAND, Wash. - The U.S. Department of Energy (DOE) will open online registration on March 8 for tours of the Hanford Site and on March 15 for B Reactor-specific tours. February 24, 2011 Praveen Thallapally | photo courtesy of Pacific Northwest National Lab 10 Questions for a Materials Chemist: Praveen Thallapally Dr. Thallapally gave us an inside look at how he's working to advance carbon capture and geothermal technologies, developing a new class of

180

DOE/EIS-0312 Record of Decision for the Washington-Action Agency Estuary Habitat MOA (09/15/09)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION ADMINISTRATOR'S RECORD OF DECISION WASHINGTON-ACTION AGENCY ESTUARY HABITAT MEMORANDUM OF AGREEMENT September 2009 i TABLE OF CONTENTS 1.0 INTRODUCTION...................................................................................................... 1 2.0 BACKGROUND ........................................................................................................ 1 2.1 What is the Columbia River Estuary?............................................................... 1 2.2 Importance of the Estuary for All Listed Stocks ............................................. 2 2.3 Estuary Habitat and the 2008 FCRPS BiOp ..................................................... 2 2.4 The March 6, 2009, hearing before Judge Redden.

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Lake-atmosphere feedbacks associated with paleolakes Bonneville and Lahontan  

SciTech Connect

A high-resolution, regional climate model nested within a general circulation model was used to study the interactions between the atmosphere and the large Pleistocene lakes in the Great Basin of the United States. Simulations for January and July 18,000 years ago indicate that moisture provided by synoptic-scale atmospheric circulation features was the primary component of the hydrologic budgets of Lakes Lahontan and Bonneville. In addition, lake-generated precipitation was a substantial component of the hydrologic budget of Lake Bonneville at that time. This local lake-atmosphere interaction may help explain differences in the relative size of these lakes 18,000 years ago.

Hostetler, S.W. (Geological Survey, Boulder, CO (United States)); Giorgi, F.; Bates, G.T. (National Center for Atmospheric Research, Boulder, CO (United States)); Bartlein, P.J. (Univ. of Oregon, Eugene, OR (United States))

1994-02-04T23:59:59.000Z

182

Categorical Exclusion Determinations: Office of Energy Efficiency...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Projects CX(s) Applied: B5.1 Date: 04132010 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 13, 2010 CX-001689:...

183

Categorical Exclusion Determinations: Office of Energy Efficiency...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Applied: B3.3, B3.6 Date: 05252011 Location(s): Snohomish County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 25, 2011 CX-006015:...

184

Categorical Exclusion Determinations: Office of Energy Efficiency...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Turbines CX(s) Applied: B3.1, B3.3 Date: 07152011 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 15, 2011 CX-006238:...

185

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

186

Corel Office Document  

Office of Legacy Management (LM)

All Departmental Elements Office of Management, Budget and Evaluation U.S. Department of Energy Washington, D.C. POLICY Approved: 05-20-02 SUBJECT: MANAGEMENT POLICY FOR PLANNING,...

187

Office of Information Resources  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Personnel Management (OPM) Billing System Office of Personnel Management (OPM) Billing System Bureau: Department of Energy Project Unique ID: 01 9-1 0-01 -22-02-3048-00 Date: 02/08/2008 A. CONTACT INFORMATION 1) Who is the person completing this document? Joanne Csordas (HS-1.21), Office of Business Operations, Office of Resource Management, Office of Health, Safety and Security, U.S. Department of Energy, HS-1.21, 1000 Independence Avenue, SW, Washington D.C. 20585, (301) 903-3573 2) Who is the system owner? Joanne Csordas (HS-1.2 l), Office of Business Operations, Office of Resource Management, Office of Health, Safety and Security, U.S. Department of Energy, HS- 1.2 1, 1000 Independence Avenue, SW, Washington D.C. 20585, (301) 903-3573 3) Who is the system manager for this system or application?

188

Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.  

DOE Green Energy (OSTI)

The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.

Ashley, Paul

1992-06-01T23:59:59.000Z

189

Annual Planning Summaries By Office | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Annual Planning Summaries By Office Annual Planning Summaries By Office Annual Planning Summaries By Office SECRETARIAL OFFICES Advanced Research and Projects Agency (ARPA-E) Electricity Delivery and Energy Reliability (OE) Energy Efficiency and Renewable Energy (EE) Environmental Management (EM) Fossil Energy (FE) Health, Safety and Security (HSS) Intelligence and Counterintelligence (IN) Legacy Management (LM) Loan Programs Office (LPO) Nuclear Energy (NE) Science (SC) POWER MARKETING ADMINISTRATIONS Bonneville Power Administration (BPA) Southeastern Power Administration (SEPA) Southwestern Power Administration (SWPA) Western Area Power Administration (WAPA) DOE FIELD OFFICES Ames Site Office (ASO) Argonne Site Office (See SC APS) Berkeley Site Office (BSO) Brookhaven Site Office (BHSO) (See SC APS)

190

Washington, DC'  

Office of Legacy Management (LM)

of. Energy of. Energy Washington, DC' 26585 , The Honorable Gene Eriquez .~ City Hall I55 Deer Hill Avenue + Danbury/Connecticut 06180 .. -r. - Dear Mayor Eriquez: Secretary of Energy Hazel O!Leary has .announced a knew approach -to openness in. the Department of Energy (DOE) and its communications with the public. In support of th,is initiative, we are,pleased to forward the enclosed information, related to the former Sperry Products,'.Inc. site in your jurisdiction ,that performed,work for DOE or its predecessor agencies. Th,is informatipn is provided,for your information, use, and retenti~oh. DOE's Formeily Utilized Sites Remedial Action Program is responsible for. identification of sites used by'DOE's predecessor agencies, determining their current radiological condition and,

191

Department Washington,  

Office of Legacy Management (LM)

Washington, of Energy DC 20545 Mr. Roy J. Villella, Jr. Assistant Secretary Diebold, Incorporated 818 Mulberry Road, S.E. F. 0. Box 8230 Canton, Ohio 44711-8230 Dear Mr..Villella: Enclosed is your copy of the signed consent form for the survey of those portions of the Diebold property used by the former owner, Herring Hall and Marvin Safe Company, to machine uranium rod for the Manhattan Engineer District. I have directed our contractor, Oak Ridge National Laboratory (ORNL), to coordinate the specific time and details for the visit and survey. Mr. Woodrow Cottrell, ORNL, or his representative, will be contacting you in this regard. If you have any questions regarding the survey, please call me at (301) 353-5439. Sincerely, Andrew Wallo III, Designation

192

Washington Update  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Energy Management Federal Energy Management Program Federal/Utility Partnership Working Group David McAndrew April 14, 2010 Providence RI Washington Update Federal Energy Management Program femp.energy.gov 3 Presentation Overview * EO 13514 - Strategic Sustainability Plans * DOE's approach * EISA section 432 update * Outreach Opportunities - Federal Energy Management Awards - Energy Empowers Campaign - GovEnergy Federal Energy Management Program femp.energy.gov 4 EO13514 Sustainability Plans Update Federal Energy Management Program femp.energy.gov 5 EO 13514 Goals In addition to GHG goals, the EO requires agencies to meet sustainability targets, including: * 30% reduction in vehicle fleet petroleum use by 2020; * 26% reduction in potable, industrial, landscaping, and agricultural water consumption by 2020;

193

Washington Update  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Partnership Working Group (FUPWG) Utility Partnership Working Group (FUPWG) eere.energy.gov The Parker Ranch installation in Hawaii Federal Energy Management Program Federal/Utility Partnership Working Group David McAndrew October 20, 2010 Rapid City, SD Washington Update 2 | Federal Utility Partnership Working Group (FUPWG) eere.energy.gov Presentation Overview * FEMP Updates * GHG Guidance Update * EISA Section 432 Update * Mark Your Calendar 3 | Federal Utility Partnership Working Group (FUPWG) eere.energy.gov * Richard Kidd is leaving FEMP - Will become Deputy Assistant Secretary of the Army for Energy and Sustainability - Skye Schell will assume the role of interim Program Manager * Jesse Feinberg (Energetics) departed over the summer to attend grad school Columbia * Sarah Mabbitt (smabbitt@energetics.com)

194

Washington Update  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Energy Management Program Federal Energy Management Program Federal Utility Partnership Working Group Meeting: Washington Update Dr. Timothy Unruh October 25-26, 2011 Philadelphia, PA 2 | Federal Energy Management Program eere.energy.gov Presentation Overview  Federal Government Goals and Status  FEMP Update  UESC Program Overview and Goals  Mark Your Calendar: Spring 2012 FUPWG 3 | Federal Energy Management Program eere.energy.gov FEMP's Mission FEMP provides the services, tools, and expertise to Federal agencies to help them achieve their legislated and executive ordered energy, greenhouse gas, and water goals. This is delivered through project financing services, technical assistance, and communications and training. 4 | Federal Energy Management Program eere.energy.gov

195

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 12, 2011 August 12, 2011 CX-006472: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 08/12/2011 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 12, 2011 CX-006470: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 08/12/2011 Location(s): Lynden, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 12, 2011 CX-006468: Categorical Exclusion Determination Testing Subcontractor for Fenestration System Energy Performance Rating Development and Research CX(s) Applied: B3.6 Date: 08/12/2011 Location(s): Everett, Washington

196

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 10, 2009 December 10, 2009 CX-000349: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: A1, A9, B5.1 Date: 12/10/2009 Location(s): Everett, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory December 10, 2009 CX-000348: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: A1, A9, B5.1 Date: 12/10/2009 Location(s): Lynden, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory December 10, 2009 CX-000347: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: A1, A9, B5.1 Date: 12/10/2009 Location(s): Snohomish County, Washington

197

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 12, 2011 December 12, 2011 CX-008010: Categorical Exclusion Determination Small-Scale Research and Development Projects Using Nanoscale Materials CX(s) Applied: B3.15 Date: 12/12/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office December 9, 2011 CX-007481: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.23 Date: 12/09/2011 Location(s): Washington Offices(s): National Energy Technology Laboratory December 9, 2011 CX-007480: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.23 Date: 12/09/2011 Location(s): Washington Offices(s): National Energy Technology Laboratory December 9, 2011 CX-007479: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project

198

Technical Paper Series Congressional Budget Office Washington, D.C. Return on Cross-Border Investment: Why Does U.S. Investment Abroad Do Better?  

E-Print Network (OSTI)

Technical papers in this series are preliminary and are circulated to stimulate discussion and critical comment. These papers are not subject to CBOs formal review and editing processes. The analyses and conclusions expressed in them are those of the authors and should not be interpreted as those of the Congressional Budget Office. References in publications should be Despite the large size of U.S. net financial obligations to foreigners, U. S. residents have continued to earn more income on their assets abroad than foreigners have on their assets in the United States. In other words, the rate of return on U.S.-owned assets abroad is still higher than the rate of return on foreign-owned assets in the United States. The advantageous return gap for U.S. investment has reflected the much greater return on U.S. direct investments abroad than that on foreign direct investments in the United States. We investigate the validity of three major hypothesis advanced to explain the persistent return gap that has been so advantageous to U.S. direct investments: (1) the risk-compensating hypothesis, which claims that U.S. direct investments abroad are riskier than foreign direct investments in the United States and therefore command a higher return to compensate for their

Juann H. Hung; Angelo Mascaro

2004-01-01T23:59:59.000Z

199

DOE NEPA Compliance Officers  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Compliance Officers NEPA Compliance Officers NEPA Compliance Officers are listed first for Program Offices, then Power Marketing Administrations, then Field Offices. Please send updates to yardena.mansoor@hq.doe.gov Oct 04, 2013 Forrestal (FORS) Addresses: Germantown (GTN) Addresses: 1000 Independence Ave SW 1000 Independence Ave SW Washington, DC 20585 Washington, DC 20585-1290 . Use for U.S. Postal Service mail. 19901 Germantown Road Germantown, MD 20874-1290 Use for EXPRESS DELIVERY (e.g. Federal Express, UPS). NAME, OFFICE, E-MAIL FAX ADDRESS PHONE william.bierbower@hq.doe.gov Advanced Research Projects Agency-Energy 202-287-6585 FORS AR-1 20585 ARPA-E William Bierbower lori.gray@go.doe.gov Energy Efficiency and Renewable Energy, Golden Field Office 720-356-1568 720-356-1350 Department of Energy

200

Washington Closure Hanford, LLC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Neil Brosee President Washington Closure Hanford, LLC 2620 Fermi Avenue Richland, Washington 99354 WEA-201 0-02 Dear Mr. Brosee: This...

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

STATEMENT FOR THE RECORD BONNEVILLE POWER ADMINISTRATION BEFORE THE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOR THE RECORD FOR THE RECORD BONNEVILLE POWER ADMINISTRATION BEFORE THE COMMITTEE ON ENERGY AND NATURAL RESOURCES UNITED STATES SENATE JUNE 20, 2013 REGARDING RESOURCE ISSUES IN THE KLAMATH RIVER BASIN The U.S Department of the Interior's Bureau of Reclamation (Reclamation) has approached the Bonneville Power Administration (BPA) with a request to provide Federal power service to the Klamath Basin Irrigation Project's load. This request was made to the Administrator by letter received on August 27, 2009, requesting a contract(s) for the purchase and delivery of power to serve existing Reclamation load within the Klamath Project in Oregon. The letter noted the load was approximately 10 average megawatts and currently is served by PacifiCorp. The Klamath

202

Bonneville County, Idaho: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Bonneville County, Idaho: Energy Resources Bonneville County, Idaho: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 43.4508683°, -111.5455289° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.4508683,"lon":-111.5455289,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

203

White Sturgeon Mitigation & Restoration in the Columbia & Snake River Upstream from Bonneville Dam  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Finding of No Significant Impact (FONSI) Summary: Bonneville Power Administration (BPA) is proposing to fund the White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Project. The project proposes to continue to carry out harvest monitoring and stock status updates coordinated with fisheries management planning, annual young-of-the year recruitment indexing, research, experimental artificial propagation, and transport of white sturgeon to less densely populated areas of the river(s). Additionally, release of hatchery-reared juveniles is proposed to evaluate release

204

Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville, The Dalles, John Day and McNary Dams; 1999-2000 Annual Report.  

DOE Green Energy (OSTI)

This report describes work conducted by the Oregon Department of Fish and Wildlife (ODFW) and the Washington Department of Fish and Wildlife (WDFW) from 1 October 1999 to 30 September 2000. The work is part of studies to evaluate spawning of fall chinook salmon (Oncorhynchus tshawytscha) and chum salmon (O. keta) below the four lowermost Columbia River dams under the Bonneville Power Administration's Project 99-003. The purpose of this project is twofold: (1) Document the existence of fall chinook and chum populations spawning below Bonneville Dam (river mile (RM) 145), The Dalles Dam (RM 192), John Day Dam (RM 216), and McNary Dam (RM 292) (Figure 1) and estimate the size of these populations; and (2) Profile stocks for important population characteristics; including spawning time, genetic make-up, emergence timing, migration size and timing, and juvenile to adult survival rates.

van der Naald, Wayne; Spellman, Bryant; Clark, Roy (Oregon Department of Fish and Wildlife, Portland, OR)

2001-10-01T23:59:59.000Z

205

(DOE/EIS-0285/SA-112): Supplement Analysis for the Transmission System Vegetation Management Program FEIS -Ross-Alcoa 1&2, 3&4 and Bonneville-Alcoa 1&2) 10/15/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October October 15, 2002 REPLY TO ATTN OF: KEP/Z-992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-112-Ross-Alcoa 1&2, 3&4 and Bonneville Alcoa 1&2. Ed Tompkins - TFO/Ross Proposed Action: Vegetation Management for portions of the Ross-Alcoa transmission lines 230kV & 115kV and Bonneville-Alcoa 115kV. Proposed by: Bonneville Power Administration (BPA). Location: Project location is within Clark County, Washington and is within the Olympia Region. Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of-Ways along access roads and around tower structures that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: See the attached checklists

206

Hydroacoustic Evaluation of Fish Passage through Bonneville Dam in 2004  

DOE Green Energy (OSTI)

The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2004. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of four studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 15 and July 15, 2004, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, (2) B2 fish guidance efficiency and gap loss, (3) smolt approach and fate at the B2 Corner Collector (B2CC), and (4) B2 vertical barrier screen head differential.

Ploskey, Gene R.; Weiland, Mark A.; Schilt, Carl R.; Kim, Jina; Johnson, Peter N.; Hanks, Michael E.; Patterson, Deborah S.; Skalski, John R.; Hedgepeth, J

2005-12-22T23:59:59.000Z

207

Hydroacoustic Evaluation of Fish Passage Through Bonneville Dam in 2002  

DOE Green Energy (OSTI)

The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) and the U.S. Army Engineer Research and Development Center (ERDC) conduct fish-passage studies at Bonneville Dam in 2002. The ERDC contracted with MEVATEC Corporation to provide staff ranging from scientists to technicians to help conduct the study. This study supports the Portland-District goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. In this report, we present results of two studies of juvenile salmonid passage at Bonneville Dam that we carried out in the 2002 downstream passage season April 20 through July 15, 2002. The first study of Project-wide FPE provides hourly estimates of fish passage and associated variances for all operating turbine units, spill bays, and the two sluiceway entrances at Powerhouse 1 (B1), as well as estimates of a variety of fish-passage efficiency and effectiveness measures. This was the third consecutive year of full-project hydroacoustic sampling and passage estimation. The second study was more narrowly focused on B2 turbines and had two components: (1) to sample the FGE at two modified turbine intakes and compare them with efficiencies of other B2 units that were sampled in the first study, and (2) to evaluate proportions of fish passing up into gatewell slots versus through screen gaps at a few B2 turbine intakes.

Ploskey, Gene R. (BATTELLE (PACIFIC NW LAB)); Schilt, Carl R. (MEVATEC); Kim, J (Lynntech); Escher, Charles (MEVATEC Corporation); Skalski, John R.

2003-08-15T23:59:59.000Z

208

Report on Audit of Bonneville Power Administration's Energy Resource Programs, IG-0379  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1995 1995 IG-1 INFORMATION: Report on "Audit of Bonneville Power Administration's Energy Resource Programs" The Secretary BACKGROUND: Bonneville Power Administration (Bonneville) was established to market and transmit hydroelectric power produced at the Bonneville Dam. Since then, Bonneville has acquired additional resources and, today, markets the power from 30 Federal dams and 1 non-federal nuclear plant in the Pacific Northwest. In April 1994, Bonneville entered into a 20-year contract to purchase the electrical output from a natural gas fired combustion turbine facility at a total cost of about $2.2 billion. Bonneville's resource acquisitions were to be made only after its planning process showed that demand for its electricity would exceed its available resources. In

209

Office of Information Resources  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Bureau of Investigations Billing System Federal Bureau of Investigations Billing System Bureau: Department of Energy Project Unique ID: 01 9-10-01 -22-02-3028-00 Date: 02/08/2008 A. CONTACT INFORMATION 1) Who is the person completing this document? Joanne Csordas (HS-1.21), Office of Business Operations, Office of Resource Management, Office of Health, Safety and Security, U.S. Department of Energy, HS-1.21, 1000 Independence Avenue, SW, Washington D.C. 20585, (301) 903-3573 2) Who is the system owner? Joanne Csordas (HS-1.21), Office of Business Operations, Office of Resource Management, Office of Health, Safety and Security, U.S. Department of Energy, HS-1.21, 1000 Independence Avenue, SW, Washington D.C. 20585, (301) 903-3573 3) Who is the system manager for this system or application?

210

Independent Activity Report, Washington River Protection Solutions, LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solutions, Solutions, LLC - October 2011 Independent Activity Report, Washington River Protection Solutions, LLC - October 2011 October 2011 Industrial Hygiene Surveillance of the Washington River Protection Solutions, LLC Industrial Hygiene Program Strategy and Implementation of the Hanford Concerns Council Recommendations [HIAR-ORP-2011-10-26] Staff from the U.S. Department of Energy's (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), in coordination with the Office of River Protection (ORP), reviewed the status and programmatic health of the Washington River Protection Solutions, LLC (WRPS) industrial hygiene program relative to the Hanford Concerns Council (HCC) Independent Review Panel (IRP) report on Chemical Vapors Industrial

211

Water Velocity Measurements on a Vertical Barrier Screen at the Bonneville Dam Second Powerhouse  

Science Conference Proceedings (OSTI)

Fish screens at hydroelectric dams help to protect rearing and migrating fish by preventing them from passing through the turbines and directing them towards the bypass channels by providing a sweeping flow parallel to the screen. However, fish screens may actually be harmful to fish if they become impinged on the surface of the screen or become disoriented due to poor flow conditions near the screen. Recent modifications to the vertical barrier screens (VBS) at the Bonneville Dam second powerhouse (B2) intended to increase the guidance of juvenile salmonids into the juvenile bypass system (JBS) have resulted in high mortality and descaling rates of hatchery subyearling Chinook salmon during the 2008 juvenile salmonid passage season. To investigate the potential cause of the high mortality and descaling rates, an in situ water velocity measurement study was conducted using acoustic Doppler velocimeters (ADV) in the gatewell slot at Units 12A and 14A of B2. From the measurements collected the average approach velocity, sweep velocity, and the root mean square (RMS) value of the velocity fluctuations were calculated. The approach velocities measured across the face of the VBS varied but were mostly less than 0.3 m/s. The sweep velocities also showed large variances across the face of the VBS with most measurements being less than 1.5 m/s. This study revealed that the approach velocities exceeded criteria recommended by NOAA Fisheries and Washington State Department of Fish and Wildlife intended to improve fish passage conditions.

Hughes, James S.; Deng, Zhiqun; Weiland, Mark A.; Martinez, Jayson J.; Yuan, Yong

2011-11-22T23:59:59.000Z

212

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Applied: B1.19 Date: 06092011 Location(s): Okanogan, Washington Office(s): Bonneville Power Administration http:energy.govnepadownloadscx-006197-categorical-exclusion-determ...

213

Categorical Exclusion Determinations: Office of Energy Efficiency...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Government Buildings CX(s) Applied: B3.6, B5.1 Date: 11062009 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy November 6, 2009 CX-000043: Categorical...

214

U.S. GOVERNMENT PRINTING OFFICE WASHINGTON  

E-Print Network (OSTI)

Nuclear Security Adminis- tration (NNSA). In addition, the Subcommittee will examine the status of inter in June. NIF's construction was supported entirely by DOE's National Nuclear Security Administration (NNSA- tion for a significant inertial fusion energy program. At this time, however, neither NNSA nor FES, nor

215

1992-1993 Bonneville Appliance Efficiency Program: Showerhead Evaluation Volume II - Appendices  

SciTech Connect

This report included the appendices for 1992-1993 Bonneville appliance efficiency program: showerhead evaluation. It consists of nine appendices, titled: Bonneville documents; overview of research projects; Puget Power and Light persistence study; hot-water flow analyses and assumptions documentation; regional end-use metering program; showerhead and faucet aerator performance assessment; Bonneville showerhead program distribution methods by participating utility; water- and energy-saving measure distribution methods literature review; REMP study load shape results.

Warwick, W.M.

1995-01-01T23:59:59.000Z

216

Report on audit of Bonneville Power Administration`s energy resource programs  

SciTech Connect

The Bonneville Power Administration (Bonneville) must ensure that the costs of its contracts for energy resources are as low as reasonably possible and that the resources are needed. During the audit, we reviewed Bonneville`s energy resource programs and focused on its purchase of electrical output from natural gas fired combustion turbines. The objective of this audit was to determine if Bonneville paid excessive costs to acquire the electrical output from combustion turbine facilities. The audit showed that Bonneville contracted to purchase the output from a combustion turbine facility at excessive cost, and that the electricity was not needed. The cost of the electricity under this contract exceeded the amount of revenue Bonneville could obtain by selling it. Bonneville estimated it would operate the generation facility for only 6 months of the year; the contract, however, required Bonneville to pay the fixed costs of the facility during the other 6 months. Consequently, the cost of the electricity plus the fixed costs in the first year of the contract would exceed revenues by $20.9 million. The contract also contained cost escalators that exceeded the rate of inflation. These cost escalators combined with the excessive initial cost resulted in projected excessive costs of $146.8 million in the first 5 years of the contract, Finally, the contract was not needed due to competition from similar facilities and a desire by customers to diversify their sources of electricity.

1995-09-08T23:59:59.000Z

217

EA-1002: Bonneville Power Administration's Hot Springs- Garrison Fiber Optic Project, Montana  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of the U.S. Department of Energy's Bonneville Power Administration's proposal to upgrade its operational telecommunications system between the Hot...

218

Washington National Records Center  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington National Records Center Washington D.C. 20404 Annette Black, IM-23, 301-903-3842 Annette.Black@hq.doe.gov John E. Davenport, Director Records Management Div. IM23270CC...

219

Categorical Exclusion (CX) Determinations By Office | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Office Office Categorical Exclusion (CX) Determinations By Office Secretarial Offices Advanced Research Projects Agency-Energy Advanced Technology Vehicles Manufacturing Loan Program Civilian Radioactive Waste Management Office of Electricity Delivery and Energy Reliability Office of Energy Efficiency and Renewable Energy Environmental Management Fossil Energy Natural Gas Regulation Health, Safety, and Security Intelligence and Counterintelligence Legacy Management Loan Programs Office Nuclear Energy Science Power Administrations Bonneville Power Administration Southeastern Power Administration Southwestern Power Administration Western Area Power Administration --Western Area Power Administration-Colorado River Storage Project Management Center --Western Area Power Administration-Desert Southwest Region

220

Hatchery Evaluation Report / Bonneville Hatchery - Tule Fall Chinook : An Independent Audit Based on Integrated Hatchery Operations Team (IHOT) Performance Measures : Final Report.  

DOE Green Energy (OSTI)

This report presents the findings of the independent audit of the Bonneville Hatchery (Tule Fall Chinook). The hatchery is located on the Columbia River just west of Cascade Locks, Oregon. The hatchery is used for adult collection, egg incubation, and rearing of Tule Fall Chinook and URB Fall Chinook. The audit was conducted in April 1996 as part of a two-year effort that will include 67 hatcheries and satellite facilities located on the Columbia and Snake River system in Idaho, Oregon, and Washington. The hatchery operating agencies include the U.S. Fish and Wildlife Service, Idaho Department of Fish and Game, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife.

Watson, Montgomery

1996-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Hatchery Evaluation Report / Bonneville Hatchery - Urb Fall Chinook : An Independent Audit Based on Integrated Hatchery Operations Team (IHOT) Performance Measures : Final Report.  

DOE Green Energy (OSTI)

This report presents the findings of the independent audit of the Bonneville Hatchery (Upriver bright [URB] Fall Chinook). The hatchery is located on the Columbia River just west of Cascade Locks, Oregon. The hatchery is used for adult collection, egg incubation, and rearing of Tule Fall Chinook and URB Fall Chinook. The audit was conducted in April 1996 as part of at two-year effort that will include 67 hatcheries and satellite facilities located on the Columbia and Snake River system in Idaho, Oregon, and Washington. The hatchery operating agencies include the U.S. Fish and Wildlife Service, Idaho Department of Fish and Game, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife.

Watson, Montgomery

1996-05-01T23:59:59.000Z

222

Bonneville Power Administration Communication Alarm Processor (CAP). Final report  

Science Conference Proceedings (OSTI)

Power systems operations and maintenance currently face an ever-increasing need for a high level of computerized support. This paper is the final report of a research and development effort undertaken by the Bonneville Power Administration to develop a computerized decision support system to aid operations and maintenance personnel isolate and diagnose faults on a microwave communication system used for centralized dispatch operations. The system, called CAP for Communication Alarm Processor, provides statistical analysis of microwave communication system alarms, as well as an expert system capability for fault isolation and diagnosis. CAP is implemented on a DEC VAX Station 3100 computer, utilizing both knowledge-based programming principles as well as conventional programming techniques.

MacGregor, D.G. [MacGregor-Bates, Inc., Eugene, OR (United States); Goeltz, R. [Oak Ridge National Lab., TN (United States)

1995-01-01T23:59:59.000Z

223

Above Bonneville Passage and Propagation Cost Effectiveness Analysis.  

DOE Green Energy (OSTI)

We have developed several models to evaluate the cost-effectiveness of alternative strategies to mitigate hydrosystem impacts on salmon and steelhead, and applied these models to areas of the Columbia River Basin. Our latest application evaluates the cost-effectiveness of proposed strategies that target mainstem survival (e.g., predator control, increases in water velocity) and subbasin propagation (e.g., habitat improvements, screening, hatchery production increases) for chinook salmon and steelhead stocks, in the portion of the Columbia Basin bounded by Bonneville, Chief Joseph, Dworshak, and Hells Canyon darns. At its core the analysis primarily considers financial cost and biological effectiveness, but we have included other attributes which may be of concern to the region.

Paulsen, C.M.; Hyman, J.B.; Wernstedt, K.

1993-05-01T23:59:59.000Z

224

Field Offices | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Field Offices Field Offices About Organization Budget Field Offices Federal Advisory Committees History Scientific and Technical Information Honors & Awards Jobs Brochures, Logos, & Information Resources Contact Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 Field Offices Print Text Size: A A A RSS Feeds FeedbackShare Page The Office of Science is accountable for the effective stewardship and management of ten world class laboratories, and employs a performance based management and operating contract model to achieve these objectives. Each Office of Science Site Office oversees the operation of their respective laboratory: Ames Site Office (AMSO) Argonne Site Office (ASO) Berkeley Site Office (BSO)

225

News From the D.C. Office: Energy-Saving Office Equipment Part 2  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Aerial view of Washington D.C. 3 Aerial view of Washington D.C. News From the D.C. Office Energy-Saving Office Equipment Part 2: Making the "Virtual Office" Real More on the DC Office efficiency up-grade: Lighting, Office Equipment: Part 1 Regular readers of the Center for Building Science News know that energy-efficient lighting and office equipment can have significant environmental and economic benefits. Previous articles ("Monitored Savings from Energy-Efficient Lighting in D.C. Office" [Spring 1997, p. 3] and "Energy-Saving Office equipment" [Summer 1997, p. 3]) discussed these features of Berkeley Lab's Washington, D.C. office. The D.C. office also serves as a demonstration site for telecommunications technologies, which have energy and environmental benefits of their own.

226

Evaluation of the Super Efficient Refrigerator Program (SERP) in the Bonneville Power Administration service territory  

Science Conference Proceedings (OSTI)

The Super Efficient Refrigerator Program (SERP) is a collaborative utility program intended to transform the market for energy-efficient and environmentally friendly refrigerators. it is one of the first examples of large-scale {open_quotes}market transformation{close_quotes} energy efficiency program. This report documents the evaluation of SERP ({open_quotes}the Program{close_quotes}) in the Bonneville Power Administration`s (Bonneville`s) service territory. Pacific Northwest National Laboratory (PNNL) conducted this evaluation for Bonneville. This study includes the process evaluation, preliminary impact evaluation, and market transformation assessment. It is based on site visits and interviews with refrigerator dealers and manufacturers, industry data, and Bonneville information. Results from this study are compared with those from a parallel study that examines the Program across the 24 participating utilities.

Lee, A.D.; Conger, R.L.

1996-06-01T23:59:59.000Z

227

Results of the Bonneville Power Administration weatherization and tightening projects at the Midway substation residential community  

Science Conference Proceedings (OSTI)

As part of a regional conservation program, the Bonneville Power Administration retrofitted 18 houses at its Midway substation in central Washington and monitored the results for a three year period. The 18 houses were divided into three groups, or cells. During the first year of the project, energy consumption was monitored but no changes were made to the houses. Prior to the second year of the project, Cell 2 received attic and crawlspace insulation, foundation sill caulking, and increased attic ventilation. Cell 3 received these retrofits plus storm windows and doors, and Cell 1 served as the control group. Before the beginning of the project's third year, each house in Cell 1 received 22 hours of infiltration reduction weatherization or house tightening. Each house in Cell 3 received 10 hours of this same type of weatherization. Cell 2 served as the control group for the house doctoring phase of the project. Energy consumption and weather data were monitored for the entire three year period. Before and after each set of retrofits, leakage area measurements were made using blower door fan pressurization, thereby allowing calculation of heating season infiltration rates. An energy use model correlating energy consumption with outside temperature was developed in order to determine improvements to the thermal conductance of the building envelope as a result of the retrofits. Energy savings were calculated based on the results of the energy use model and, as a check on these findings, the Computerized Instrumented Residential Analysis (CIRA) load calculation program developed at Lawrence Berkeley Laboratory provided a theoretical estimate of the savings resulting from the retrofits.

Dickinson, J.B.; Grimsrud, D.T.; Krinkel, D.L.; Lipschutz, R.D.

1982-02-01T23:59:59.000Z

228

Final Environmental Impact Statement Plymouth Generating Facility Plymouth, Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plymouth Generating Facility Plymouth Generating Facility Plymouth, Washington Prepared by: Benton County, Washington Bonneville Power Administration (DOE/EIS 0345) June 2003 Final Environmental Impact Statement Plymouth Generating Facility To: People Interested in the Plymouth Generating Facility Enclosed is the Final EIS for the Plymouth Generating Facility. The Draft EIS was published in August 2002, and comments were received through October 5, 2002. The Final EIS contains revisions to the Draft EIS and our responses to public and agency comments on the Draft EIS. This letter briefly describes the Final EIS, outlines our next steps, and tells how to contact us if you have questions. The Final EIS is abbreviated, consisting of an updated summary and project description

229

EA-1959: Eightmile Ranch Coho Acclimation Site, Okanogan County, Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Eightmile Ranch Coho Acclimation Site, Okanogan County, 9: Eightmile Ranch Coho Acclimation Site, Okanogan County, Washington EA-1959: Eightmile Ranch Coho Acclimation Site, Okanogan County, Washington SUMMARY Bonneville Power Administration and USDA Forest Service, Okanogan-Wenatchee National Forest, are jointly preparing an EA to assess the potential environmental impacts of funding a proposal by the Confederated Tribes and Bands of the Yakama Nation to construct and operate a coho salmon acclimation pond at Eightmile Ranch, which is owned and operated by the Forest Service. BPA's Mid-Columbia Coho Restoration Program EIS (DOE/EIS-0425) addressed the overall coho restoration program, with 11 acclimation sites. Some of these sites proved infeasible, so the Yakama Nation is proposing a new site at Eightmile Ranch. Young coho would be held

230

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 9, 1995 November 9, 1995 EA-1123: Final Environmental Assessment Transfer of Normal and Low-Enriched Uranium Billets to the United Kingdom, Hanford Site, Richland, Washington October 1, 1995 EIS-0212: Final Environmental Impact Statement Safe Interim Storage of Hanford Tank Wastes, Hanford Site, Richland, Washington October 1, 1995 EIS-0173: DOE Notice of Availability of the Record of Decision Puget Power Northwest Washington Transmission Project October 1, 1995 EIS-0245: Draft Environmental Impact Statement Management of Spent Nuclear Fuel from the K Basins at the Hanford Site, Richland, Washington May 1, 1995 EA-0984: Finding of No Significant Impact Deactivation of the N Reactor Facilities, Richland, Washington May 1, 1995 EA-0984: Final Environmental Assessment Deactivation of the N Reactor Facilities, Richland, Washington

231

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 25, 1994 February 25, 1994 EA-0915: Final Environmental Assessment Waste Tank Safety Program Hanford Site, Richland, Washington January 1, 1994 EIS-0194: Final Environmental Impact Statement Tenaska Washington II Generation Project, Washington September 16, 1993 EIS-0119: Record of Decision Decommissioning of Eight Surplus Production Reactors at the Hanford Site, Richland, Washington December 1, 1992 EIS-0119: Final Environmental Impact Statement Decommissioning of Eight Surplus Production Reactors at the Hanford Site, Richland, Washington September 1, 1992 EA-0429: Final Environmental Assessment Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington August 10, 1992 EA-0881: Finding of No Significant Impact Tank 241-c-103 Organic Vapor and Liquid Characterization and Supporting

232

Washington County- Wind Ordinance  

Energy.gov (U.S. Department of Energy (DOE))

This ordinance establishes regulations to facilitate the installation and construction of Small Wind Energy Systems in Washington County for private landowners, subject to reasonable restrictions...

233

,"Washington Natural Gas Prices"  

U.S. Energy Information Administration (EIA) Indexed Site

Of Series","Frequency","Latest Data for" ,"Data 1","Washington Natural Gas Prices",12,"Annual",2012,"6301967" ,"Release Date:","10312013" ,"Next Release...

234

Categorical Exclusion Determinations: Office of River Protection-Richland  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 1, 2011 March 1, 2011 CX-005367: Categorical Exclusion Determination Project T-222 Hazardous Materials Management Emergency Response (HAMMER) Training Facility Water Main Extension for Fire Protection CX(s) Applied: B1.3, B1.15 Date: 03/01/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office March 1, 2011 CX-005366: Categorical Exclusion Determination Herbicide Applications Along Gravel and Paved Roads on the Hanford Site CX(s) Applied: B1.3 Date: 03/01/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office January 31, 2011 CX-005190: Categorical Exclusion Determination Project L-691, 200 West Area Sanitary Sewage Lagoon CX(s) Applied: B1.26 Date: 01/31/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office

235

Categorical Exclusion Determinations: Office of River Protection-Richland  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 22, 2011 August 22, 2011 CX-006835: Categorical Exclusion Determination 241-T Tank Farm Debris Barrier Fence CX(s) Applied: B1.11 Date: 08/22/2011 Location(s): Richland, Washington Office(s): River Protection-Richland Operations Office, Golden Field Office August 11, 2011 CX-006490: Categorical Exclusion Determination Bat Roost Tower Construction CX(s) Applied: B1.20 Date: 08/11/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 28, 2011 CX-006063: Categorical Exclusion Determination Limited Firebreak Maintenance on the Hanford Site During Calendar Year 2011 CX(s) Applied: B1.3 Date: 06/28/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006092: Categorical Exclusion Determination

236

Code Compliance Technical Meeting: Building Technologies Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Compliance Compliance Technical Meeting: Building Technologies Office Department of Energy Washington, DC APRIL 2013 1 Welcome Welcome to The Building Technologies Office's Code Compliance Technical Meeting and to Washington, DC. On behalf of the Department of Energy Building Technology Office (BTO), we would like to thank you for attending, for your participation. The goal of this meeting is to review and discuss ongoing projects and existing activities that improve compliance with model energy codes. DOE

237

STATE OF WASHINGTON DEPARTMENT OF COMMERCE 1011 Plum Street SE  

NLE Websites -- All DOE Office Websites (Extended Search)

STATE OF WASHINGTON STATE OF WASHINGTON DEPARTMENT OF COMMERCE 1011 Plum Street SE  PO Box 42525  Olympia, Washington 98504-2525  (360) 725-4000 www.commerce.wa.gov July 33, 2013 Roland J. Risser Building Technologies Program Manager Office of Energy Efficiency and Renewable Energy U.S. Department of Energy 1000 Independence Avenue SW, Mail Stop EE-2J Washington, DC 20585-0121 RE: State Certification of Residential and Commercial Building Energy Codes Dear Mr. Risser: In compliance with Title III of the Energy Conservation and Production Act (ECPA) of 1976, as amended, this is to certify that the State of Washington has adopted the 2012 Edition, Washington State Energy Code, which meets or exceeds the 2012 version of the International Energy Conservation Code (IECC) for low-rise residential

238

EIS-0425: Mid-Columbia Coho Restoration, Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25: Mid-Columbia Coho Restoration, Washington 25: Mid-Columbia Coho Restoration, Washington EIS-0425: Mid-Columbia Coho Restoration, Washington Summary This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to fund the construction, operation, and maintenance of a coho salmon restoration program sponsored by the Confederated Tribes and Bands of the Yakama Nation to help mitigate impacts to fish affected by the Federal Columbia River Power System dams on the Columbia River. The Proposed Action would involve building a new, small, in-basin adult holding/spawning, incubation and rearing facility on the Wenatchee River at one of two potential sites; and constructing and improving several sites in both the Wenatchee and Methow river basins in north central Washington State.

239

EIS-0425: Mid-Columbia Coho Restoration, Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0425: Mid-Columbia Coho Restoration, Washington EIS-0425: Mid-Columbia Coho Restoration, Washington EIS-0425: Mid-Columbia Coho Restoration, Washington Summary This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to fund the construction, operation, and maintenance of a coho salmon restoration program sponsored by the Confederated Tribes and Bands of the Yakama Nation to help mitigate impacts to fish affected by the Federal Columbia River Power System dams on the Columbia River. The Proposed Action would involve building a new, small, in-basin adult holding/spawning, incubation and rearing facility on the Wenatchee River at one of two potential sites; and constructing and improving several sites in both the Wenatchee and Methow river basins in north central Washington State.

240

Bonneville Power Administration Wildlife Mitigation Program : Draft Environmental Impact Statement.  

DOE Green Energy (OSTI)

Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information.

United States. Bonneville Power Administration.

1996-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

News From the D.C. Office: Efficient Office Equipment  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Aerial view of Washington D.C. 3 Aerial view of Washington D.C. News From the D.C. Office Efficient Office Equipment: Update and a Look Ahead An extended version of this article is available here. We are now well aware of the large amount of energy consumed by "plug-in loads" such as personal computers (PCs) and other office electronics. Office equipment is often cited as the fastest-growing end-use of electricity in the fastest-growing sector of demand (commercial buildings). According to Dataquest figures, world growth of PCs will average 14 to 15 percent per year through 1999. Only ten years ago, office equipment was not even part of the "map" of non-residential energy end-uses. There were virtually no data on office equipment energy use, nor an awareness of the

242

Contact | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

& Information Resources Contact Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 Contact Print...

243

Secretary of Energy Announces New Office of Electricity Delivery...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Electricity Delivery & Energy Reliability Secretary of Energy Announces New Office of Electricity Delivery & Energy Reliability June 9, 2005 - 1:45pm Addthis WASHINGTON, DC --...

244

Energy' TEfl9 Associated Post Office Box 117  

Office of Legacy Management (LM)

Division Office of Environmental Restoration and Waste Management U.S. Department of Energy Washington, DC 20545 Subject: DRAFT VERIFICATION SURVEY OF PARCEL 1A ELZA GATE SITE,...

245

State Energy Program Assurances - Washington Governor Gregoire...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

State Energy Program Assurances - Washington Governor Gregoire State Energy Program Assurances - Washington Governor Gregoire Letter from Washington Governor Gregoire providing...

246

Office of Survey Development and Statistical Integration  

U.S. Energy Information Administration (EIA) Indexed Site

Steve Harvey Steve Harvey April 27, 2011 | Washington, D.C. Tough Choices in U.S. EIA's Data Programs Agenda * Office of Oil, Gas, and Coal Supply Statistics * Office of Petroleum and Biofuels Statistics * Office of Electricity, Renewables, and Uranium Statistics * Office of Energy Consumption and Efficiency Statistics * Office of Survey Development and Statistical Integration 2 Presenter name, Presentation location, Presentation date Coal Data Collection Program 3 James Kendell Washington, DC, April 27, 2011 Quarterly Coal Consumption and Quality Report, Manufacturing and Transformation/Processing Coal Plants and Commercial and Institutional Coal Users EIA-3 Quarterly Coal Consumption and Quality Report - Coke Plants EIA-5 Coal Production and Preparation

247

Microsoft Word - CX-Bonneville-HoodRiverDangerPoleandARFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 14, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Darin Bowman Civil Engineer - TELF-TPP-3 Proposed Action: Bonneville-Hood River No. 1 Danger Pole Replacement and Access Road Upgrades Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine Maintenance Location: Hood River County, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: Upgrade access roads and landings from Structures 6/1 through 7/4 and replace danger poles on the Bonneville-Hood River No. 1 115-kV transmission line. Background This project entails improving the existing access along the Bonneville-Hood River No. 1 transmission line; maintaining existing structure landings; and replacing three danger poles and associated hardware.

248

EA-0956: South Fork Snake River/Palisades Wildlife Mitigation Project, Bonneville County, Idaho  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of the U.S. Department of Energy's Bonneville Power Administration proposal to fund the implementation of the South Fork Snake River Programmatic...

249

CX-008886: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

AT&T Fiber Addition North Bonneville-Ross No. 2 CX(s) Applied: B4.7 Date: 08/09/2012 Location(s): Washington Offices(s): Bonneville Power Administration

250

CX-008704: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Grand Coulee-Bell No. 3 Double Circuit 230 Kilovolt Transmission Line Reconductoring Project CX(s) Applied: B1.3 Date: 05/31/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration

251

CX-010738: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 07/15/2013 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration

252

Washington Profile - Energy Information Administration  

U.S. Energy Information Administration (EIA)

Washington Quick Facts. The Grand Coulee Dam on Washington's Columbia River is the largest hydroelectric power producer in the United States, with a total generating ...

253

1992-1993 Bonneville Appliance Efficiency Program: Showerhead evaluation. Volume I - report  

SciTech Connect

The Bonneville Power Administration (Bonneville) provides wholesale electric power to over 100 retail distribution utilities in the Pacific Northwest. Bonneville is faced with meeting growing loads from these utilities. It acquires conservation as one means of meeting this load growth. Bonneville has offered a variety of conservation programs since 1980. Efficient showerheads have been a feature in residential conservation programs ever since. Bonneville launched the Residential Appliance Efficiency Program to focus on water-heater energy conservation opportunities in 1992. The Residential Appliance Efficiency Program consists of two parts, a water-heater efficiency program, and a hot-water efficiency program. This report evaluates the savings and costs of the first two years of the showerhead portion of the Residential Appliance Efficiency Program (the showerhead program). Although it is not a formal evaluation of the program limited to implementation or a {open_quotes}process{close_quotes} evaluation, observations about program design and implementation are included as appropriate. Results of this evaluation are limited to program participants within the Bonneville service territory.

Warwick, W.M.

1995-01-01T23:59:59.000Z

254

Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010  

Science Conference Proceedings (OSTI)

The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

2012-09-01T23:59:59.000Z

255

Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010  

SciTech Connect

The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

2011-02-01T23:59:59.000Z

256

Itron (Washington) | Open Energy Information  

Open Energy Info (EERE)

Itron Itron Address 601 Officers Row Place Vancouver, Washington Zip 98661 Sector Efficiency Product Manufactures/sells advanced meters and data collection systems Website http://www.itron.com/ Coordinates 45.627447°, -122.656794° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.627447,"lon":-122.656794,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

257

EM Announces New Director of Office of External Affairs | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Announces New Director of Office of External Affairs EM Announces New Director of Office of External Affairs May 7, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM has announced...

258

Preliminary Notice of Violation, URS-Washington Division - WEA-201101 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

URS-Washington Division - URS-Washington Division - WEA-201101 Preliminary Notice of Violation, URS-Washington Division - WEA-201101 October 3, 2011 Preliminary Notice of Violation issued to URS-Washington Division related to a Hoisting Incident that occurred at the Sodium Bearing Waste Treatment Project at the Idaho National Laboratory This letter refers to the Office of Health, Safety and Security's Office of Enforcement and Oversight investigation into the facts and circumstances associated with the October 4, 2010, hoisting incident that occurred when a telescopic hydraulic gantry system (THGS) tipped while lifting a 7,800-pound shield plug at the Sodium Bearing Waste Treatment Project (SBWTP) located at the U.S. Department of Energy (DOE) Idaho National Laboratory. The noncompliances associated with this event were reported

259

Preliminary Notice of Violation, Washington Closure Hanford, LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington Closure Hanford, LLC - Washington Closure Hanford, LLC - WEA-2010-02 Preliminary Notice of Violation, Washington Closure Hanford, LLC - WEA-2010-02 August 19, 2010 Preliminary Notice of Violation issued to Washington Closure Hanford, LLC related an Employee Fall at the High Bay Testing Facility (336 Building) at the Hanford Site This letter refers to the Office of Health, Safety and Security's Office of Enforcement investigation into the facts and circumstances surrounding the employee fall that occurred at the Hanford High Bay Testing Facility (336 Building) on July 1, 2009. The worker sustained serious injury to his back and broke bones in both legs. Based on an evaluation of the evidence in this matter, the U.S. Department of Energy (DOE) has concluded that violations of 10 C.F.R. Part 851, Worker Safety and Health Program, by

260

Categorical Exclusion Determinations: Washington, D.C. | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington, D.C. Washington, D.C. Categorical Exclusion Determinations: Washington, D.C. Location Categorical Exclusion Determinations issued for actions in Washington, D.C. DOCUMENTS AVAILABLE FOR DOWNLOAD June 11, 2013 CX-010460: Categorical Exclusion Determination Novel Low Cost Environmentally Friendly Synthetic Approaches toward Core-Shell Structured Micro CX(s) Applied: B3.6 Date: 06/11/2013 Location(s): District of Columbia Offices(s): National Energy Technology Laboratory March 28, 2013 CX-010567: Categorical Exclusion Determination Lawrence Berkeley National Laboratory - Rapid Automated Modeling and Simulation of Existing Buildings for Energy Efficiency CX(s) Applied: B3.6 Date: 02/28/2013 Location(s): California, District of Columbia Offices(s): Advanced Research Projects Agency-Energy

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Clean Cities: Greater Washington Region Clean Cities coalition  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Washington Region Clean Cities Coalition Washington Region Clean Cities Coalition The Greater Washington Region Clean Cities coalition works with vehicle fleets, fuel providers, community leaders, and other stakeholders to reduce petroleum use in transportation. Greater Washington Region Clean Cities coalition Contact Information Ron Flowers 202-671-1580 ronflowers@gwrccc.org Coalition Website Clean Cities Coordinator Ron Flowers Photo of Ron Flowers Ronald S. "Ron" Flowers, now retired, most recently served as the Director of the Office of Labor-Management Programs (OLMP), under the Executive Office of the Mayor of the District of Columbia (DC) Government. Flowers' senior management experience spans more than 35 years in the public and private sectors, and includes serving as the Fleet Administrator for the DC

262

Department of Energy - Washington  

263

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 17, 2009 July 17, 2009 EIS-0424: Notice of Intent to Prepare an Environmental Impact Statement Klickitat Hatchery Program, Klickitat and Yakima Counties, WA July 1, 2009 EA-1660: Final Environmental Assessment Combined Community Communications Facility and Infrastructure Cleanup on the Fitzner/Eberhardt Arid Lands Ecology Reserve, Hanford Site, Richland, Washington April 21, 2009 EIS-0419: Notice of Intent to Prepare an Environmental Impact Statement Whistling Ridge Energy Project in Skamania County, Washington. March 12, 2009 State Energy Program Assurances - Washington Governor Gregoire Letter from Washington Governor Gregoire providing Secretary Chu with the assurances needed so that Recovery Act funds can be made available. These assurances are required by Section 410 of the American Recovery and

264

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 8, 2000 March 8, 2000 EIS-0169-SA-03: Supplement Analysis Yakima Fisheries Project-Use of Washington Department of Fish and Wildlife's Yakima Hatchery and Acclimation and Research Activities, Yakima, Yakima County, Washington, Easton, Kittitas County, Washington September 15, 1999 EIS-0310: Notice of Intent to Prepare a Programmatic Environmental Impact Statement Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States, Including the Role of the Fast Flux Test Facility September 1, 1999 EIS-0222: Final Environmental Impact Statement Hanford Comprehensive Land-Use Plan, Hanford Site, Richland, Washington August 16, 1999 EIS-0169-SA-02: Supplement Analysis Yakima Fisheries Project-Natural Spawning Channels, Increased On-site

265

Washington Gasoline Price Data  

NLE Websites -- All DOE Office Websites (Extended Search)

Washington Exit Fueleconomy.gov The links below are to pages that are not part of the fueleconomy.gov. We offer these external links for your convenience in accessing additional...

266

Geothermal Technologies Program: Washington  

DOE Green Energy (OSTI)

This fact sheets provides a summary of geothermal potential, issues, and current development in Washington State. This fact sheet was developed as part of DOE's GeoPowering the West initiative, part of the Geothermal Technologies Program.

Not Available

2005-02-01T23:59:59.000Z

267

CX-008161: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Prosser Hatchery Backup Generator Replacement CX(s) Applied: B1.31 Date: 04/16/2012 Location(s): Washington Offices(s): Bonneville Power Administration

268

CX-008691: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Mason Substation Metering Replacement Project CX(s) Applied: B1.7 Date: 06/25/2012 Location(s): Washington Offices(s): Bonneville Power Administration

269

CX-008875: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Bingen Substation Sectionalizing Switches Disposition CX(s) Applied: B1.24 Date: 08/27/2012 Location(s): Washington Offices(s): Bonneville Power Administration

270

CX-008882: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Sno-King Substation Expansion CX(s) Applied: B4.11 Date: 08/08/2012 Location(s): Washington Offices(s): Bonneville Power Administration

271

CX-010346: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Monroe Substation Integrated Project CX(s) Applied: B4.11 Date: 05/08/2013 Location(s): Washington Offices(s): Bonneville Power Administration

272

CX-010341: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Chandler Tap Line Reconductoring CX(s) Applied: B4.6 Date: 05/17/2013 Location(s): Washington Offices(s): Bonneville Power Administration

273

CX-010589: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Nine Canyon Communication Tower Addition CX(s) Applied: B4.6 Date: 07/01/2013 Location(s): Washington Offices(s): Bonneville Power Administration

274

CX-009202: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Port Angeles Substation Equipment Additions CX(s) Applied: B4.6 Date: 09/14/2012 Location(s): Washington Offices(s): Bonneville Power Administration

275

CX-008699: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Old Highway Bridge Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration

276

CX-008698: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Poorman Ponds Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration

277

CX-010724: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Franklin Substation Upgrades CX(s) Applied: B4.11 Date: 08/19/2013 Location(s): Washington Offices(s): Bonneville Power Administration

278

CX-010588: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Chehalis Substation Tree Clearing CX(s) Applied: B1.3 Date: 07/02/2013 Location(s): Washington Offices(s): Bonneville Power Administration

279

CX-010148: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Merritt Radio Station Upgrade CX(s) Applied: B1.19 Date: 04/18/2013 Location(s): Washington Offices(s): Bonneville Power Administration

280

CX-008684: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Metaline Radio Station Upgrade Project CX(s) Applied: B1.19 Date: 07/11/2012 Location(s): Washington Offices(s): Bonneville Power Administration

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

CX-008706: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Tunk Mountain Radio Station Upgrade CX(s) Applied: B1.19 Date: 05/30/2012 Location(s): Washington Offices(s): Bonneville Power Administration

282

Enforcement Letter, Washington TRU Solutions - September 8, 2006 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington TRU Solutions - September 8, 2006 Washington TRU Solutions - September 8, 2006 Enforcement Letter, Washington TRU Solutions - September 8, 2006 September 8, 2006 Enforcement Letter issued to Washington TRU Solutions, LLC related to Quality Assurance Deficiencies associated with the Super High-Efficiency Neutron Counter Non-Destructive Assay System Refurbishment at the Waste Isolation Pilot Plant The Office of Price-Anderson Enforcement (OE) has conducted a preliminary evaluation of the deficiencies described in Noncompliance Tracking System (NTS) report NTS-CBFO-WIPP-WIPP-2006-0001. Our evaluation included review of the investigation/causal analysis and discussion with you and other site personnel during an informal conference held on August 1, 2006. Enforcement Letter, Washington TRU Solutions -September 8, 2006

283

Washington Profile - Energy Information Administration  

U.S. Energy Information Administration (EIA)

Nuclear Power Plants : ... Clean Cities Coalitions Western Washington (Seattle) ... Governor Chris Gregoire - Initiatives - Energy;

284

Energy Matters in Washington State  

E-Print Network (OSTI)

Energy Matters in Washington State Energy Matters in Washington State www.energy.wsu.edu/library/ November 2009 #12;905 Plum Street SE, Building 3 P.O. Box 43169 Olympia, Washington 98504-3169 Energy University Extension Energy Program. 905 Plum Street SE, Building 3, P.O. Box 43169, Olympia, Washington

Collins, Gary S.

285

Department of Energy Office of Science  

E-Print Network (OSTI)

Department of Energy Office of Science Washington, DC 20585 October 5, 2010 Dear Student: Congratulations! You have been selected to attend and compete in the Science and Energy Research Challenge (SERCh

286

DOE/EIS-0169-SA-03: Supplement Analysis for Yakima Fisheries Project --Use of Washington Dept. of Fish and Wildlife's Yakima Hatchery and Acclimation and Research Activities (03/08/00)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 8, 2000 March 8, 2000 REPLY TO ATTN OF: KECN-4 SUBJECT: Supplement Analysis for Yakima Fisheries Project, (DOE/EIS-0169-SA-03) David Byrnes Project Manager - KEWN-4 Proposed Action: Yakima Fisheries Project - Use of Washington Department of Fish and Wildlife's Yakima Hatchery and Acclimation and Research Activities PL-6: F3204 Location: Yakima, Yakima County, Washington; and Easton, Kittitas County, Washington Proposed by: Bonneville Power Administration (BPA) and Co-Managed by the Yakama Nation (YN) and the Washington Department of Fish and Wildlife (WDFW). 1. Introduction The Bonneville Power Administration is funding ongoing studies, research, and artificial production of several salmonid species in the Yakima and Klickitat river basins. BPA analyzed environmental impacts of research and supplementation projects in the Yakima basin in an

287

Categorical Exclusion Determinations: Office of River Protection-Richland  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 13, 2012 January 13, 2012 CX-007980: Categorical Exclusion Determination Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 Scheduled To Take Place CX(s) Applied: B1.22 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office January 13, 2012 CX-007979: Categorical Exclusion Determination Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 Scheduled To Take Place CX(s) Applied: B1.17 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office January 13, 2012 CX-007978: Categorical Exclusion Determination Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 CX(s) Applied: B1.16 Date: 01/13/2012 Location(s): Washington

288

Categorical Exclusion Determinations: Pacific Northwest Site Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pacific Northwest Site Office Pacific Northwest Site Office Categorical Exclusion Determinations: Pacific Northwest Site Office Categorical Exclusion Determinations issued by Pacific Northwest Site Office. DOCUMENTS AVAILABLE FOR DOWNLOAD July 16, 2012 CX-009099: Categorical Exclusion Determination Routine Maintenance CX(s) Applied: B1.3, B1.4, B1.8, B1.16, B1.17 Date: 07/16/2012 Location(s): Washington Offices(s): Pacific Northwest Site Office June 28, 2012 CX-009097: Categorical Exclusion Determination U.S. Customs and Border Protection High-Energy Radiography Test Capability CX(s) Applied: B3.10, B3.11 Date: 06/28/2012 Location(s): Washington Offices(s): Pacific Northwest Site Office May 18, 2012 CX-009096: Categorical Exclusion Determination U.S. Customs and Border Protection Non-Intrusive Inspection Tests

289

Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2003-2004 Annual Report.  

DOE Green Energy (OSTI)

In 2003 a total of 253 adult fall chinook and 113 chum were sampled for biological data in the Ives and Pierce islands area below Bonneville Dam. Vital statistics were developed from 221 fall chinook and 109 chum samples. The peak redd count for fall chinook was 190. The peak redd count for chum was 262. Peak spawning time for fall chinook was set at approximately 24 November. Peak spawning time for chum occurred approximately 24 November. There were estimated to be a total of 1,533 fall chinook spawning below Bonneville Dam in 2003. The study area's 2003 chum population was estimated to be 688 spawning fish. Temperature unit data suggests that below Bonneville Dam 2003 brood bright stock, fall chinook emergence began on January 6, 2004 and ended 28 April 2004, with peak emergence occurring 13 April. 2003 brood juvenile chum emergence below Bonneville Dam began 22 February and continued through 15 April 2004. Peak chum emergence took place 25 March. A total of 25,433 juvenile chinook and 4,864 juvenile chum were sampled between the dates of 20 January and 28 June 2004 below Bonneville Dam. Juvenile chum migrated from the study area in the 40-55 mm fork length range. Migration of chum occurred during the months of March, April and May. Sampling results suggest fall chinook migration from rearing areas took place during the month of June 2004 when juvenile fall chinook were in the 65 to 80 mm fork length size range. Adult and juvenile sampling below Bonneville Dam provided information to assist in determining the stock of fall chinook and chum spawning and rearing below Bonneville Dam. Based on observed spawning times, adult age and sex composition, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration, it appears that in 2003 all of the fall chinook using the area below Bonneville Dam were of a late-spawning, bright stock. Observed spawning times, adult age and sex composition, GSI and DNA analysis, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration suggests chum spawning and rearing below Bonneville dam are similar to stocks of chum found in Hamilton and Hardy creek and are part of the Lower Columbia River Chum ESU.

van der Naald, Wayne; Duff, Cameron; Brooks, Robert (Oregon Department of Fish and Wildlife, Columbia River Section, John Day, OR)

2005-01-01T23:59:59.000Z

290

Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2002-2003 Annual Report.  

DOE Green Energy (OSTI)

In 2002 a total of 364 adult fall chinook and 472 chum were sampled for biological data in the Ives and Pierce islands area below Bonneville Dam. Vital statistics were developed from 290 fall chinook and 403 chum samples. The peak redd count for fall chinook was 214. The peak redd count for chum was 776. Peak spawning time for fall chinook was set at approximately 15 November. Peak spawning time for chum occurred approximately 6 December. There were estimated to be a total of 1,881 fall chinook spawning below Bonneville Dam in 2002. The study area's 2002 chum population was estimated to be 4,232 spawning fish. Temperature unit data suggests that below Bonneville Dam 2002 brood bright stock, fall chinook emergence began on February 3 2003 and ended 7 May 2003, with peak emergence occurring 20 April. 2002 brood juvenile chum emergence below Bonneville Dam began 27 January and continued through 6 April 2003. Peak chum emergence took place 1 March. A total of 10,925 juvenile chinook and 1,577 juvenile chum were sampled between the dates of 24 January and 21 July 2003 below Bonneville Dam. Juvenile chum migrated from the study area in the 40-55 mm fork length range. Migration of chum occurred during the months of March, April and May. Sampling results suggest fall chinook migration from rearing areas took place during the month of June 2003 when juvenile fall chinook were in the 65 to 80 mm fork length size range. Adult and juvenile sampling below Bonneville Dam provided information to assist in determining the stock of fall chinook and chum spawning and rearing below Bonneville Dam. Based on observed spawning times, adult age and sex composition, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration, it appears that in 2002 and 2003 the majority of fall chinook using the area below Bonneville Dam were of a late-spawning, bright stock of fall chinook. Observed spawning times, adult age and sex composition, GSI and DNA analysis, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration suggests chum spawning and rearing below Bonneville dam are similar to stocks of chum found in Hamilton and Hardy creek and are part of the Lower Columbia River Chum ESU.

van der Naald, Wayne; Clark, Roy; Brooks, Robert (Oregon Department of Fish and Wildlife, Columbia River Section, John Day, OR)

2004-01-01T23:59:59.000Z

291

Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville, The Dalles, John Day, and McNary Dams; 2000-2001 Annual Report.  

DOE Green Energy (OSTI)

This report describes work conducted by the Oregon Department of Fish and Wildlife (ODFW) and the Washington Department of Fish and Wildlife (WDFW) from 1 October 2000 to 30 September 2001. The work is part of studies to evaluate spawning of fall chinook salmon (Oncorhynchus tshawytscha) and chum salmon (O. keta) below the four lowermost Columbia River dams under the Bonneville Power Administration's Project 99-003. The purpose of this project is twofold: (1) Document the existence of fall chinook and chum populations spawning below Bonneville Dam (river mile (RM) 145), The Dalles Dam (RM 192), John Day Dam (RM 216), and McNary Dam (RM 292) (Figure 1) and estimate the size of these populations. (2) Profile stocks for important population characteristics; including spawning time, genetic make-up, emergence timing, migration size and timing, and juvenile to adult survival rates. Specific tasks conducted by ODFW and WDFW during this period were: (1) Documentation of fall chinook and chum spawning below Bonneville, The Dalles, John Day and McNary dams using on-water observations; (2) Collection of biological data to profile stocks in areas described in Task 1; (3) Determination of spawning population estimates and age composition, average size at return, and sex ratios in order to profile stocks in areas described in Task 1; (4) Collection of data to determine stock origin of adult salmon found in areas described in Task 1; (5) Determination of possible stock origins of adult salmon found in areas described in Task 1 using tag rates based on coded-wire tag recoveries and genetic baseline analysis; (6) Determination of emergence timing and hatching rate of juvenile fall chinook and chum below Bonneville Dam; (7) Determination of migration time and size for juvenile fall chinook and chum rearing in the area described in Task 6; (8) Investigation of feasibility of determining stock composition of juvenile fall chinook and chum rearing in the area described in Task 6; (9) Documentation of entrapment in low-lying areas of juvenile fall chinook and chum rearing in the area described in Task 6; and (10) Investigation of feasibility of determining juvenile to adult survival rate from coded-wire tagged juvenile fall chinook captured and tagged in the area described in Task 6.

van der Naald, Wayne; Clark, Roy; Spellman, Bryant (Oregon Department of Fish and Wildlife, Portland, OR)

2002-09-17T23:59:59.000Z

292

Evaluation of Fall Chinook and Chum Salmon below Bonneville, The Dalles, John Day and McNary Dams; 1998-1999 Annual Report.  

DOE Green Energy (OSTI)

This report describes work conducted by the Oregon Department of Fish and Wildlife (ODFW) and the Washington Department of Fish and Wildlife (WDFW) from 1 October 1998 to 30 September 1999. The work is part of studies to evaluate spawning of fall chinook salmon (Oncorhynchus tshawytscha) and chum salmon (O. keta) below the four lowermost Columbia River dams under the Bonneville Power Administration's Project 99-003. The purpose of this project is twofold: (1) Document the existence of fall chinook and chum populations spawning below Bonneville Dam (river mile (RM) 145), The Dalles Dam (RM 192), John Day Dam (RM 216), and McNary Dam (RM 292) (Figure 1) and estimate the size of these populations; and (2) Profile stocks for important population characteristics; including spawning time, genetic make-up, emergence timing, migration size and timing, and juvenile to adult survival rates. Specific tasks conducted by ODFW and WDFW during this period were: (1) Documentation of fall chinook and chum spawning below Bonneville, The Dalles, John Day and McNary dams using on-water observations; (2) Collection of biological data to profile stocks in areas described in Task 1; (3) Determination of spawning population estimates and age composition, average size at return, and sex ratios in order to profile stocks in areas described in Task 1; (4) Collection of data to determine stock origin of adult salmon found in areas described in Task 1; (5) Determination of possible stock origins of adult salmon found in areas described in Task 1 using tag rates based on coded-wire tag recoveries and genetic baseline analysis; (6) Determination of emergence timing and hatching rate of juvenile fall chinook and chum below Bonneville Dam; (7) Determination of migration time and size for juvenile fall chinook and chum rearing in the area described in Task 6; (8) Investigation of feasibility of determining stock composition of juvenile fall chinook and chum rearing in the area described in Task 6; (9) Documentation of stranding and entrapment in low-lying areas of juvenile fall chinook and chum rearing in the area described in Task 6; and (10) Investigation of feasibility of coded-wire tagging juvenile fall chinook captured in the area described in Task 6 to determine juvenile to adult survival rate.

van der Naald, Wayne; Clark, Roy; Spellman, Bryant

1999-12-01T23:59:59.000Z

293

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 15, 2001 May 15, 2001 EIS-0285-SA-10: Supplement Analysis Transmission System Vegetation Management Program May 1, 2001 EIS-0285-SA-11: Supplement Analysis Transmission System Vegetation Management Program April 23, 2001 EIS-0285-SA-08: Supplement Analysis Transmission System Vegetation Management Program, Raver - Covington Line 1 April 13, 2001 EIS-0285-SA-06: Supplement Analysis Vegetation Management of annual weeds on seven acres of Bonneville Power Administration (BPA) owned pastureland at the Walla Walla Substation April 13, 2001 EIS-0285-SA-06: Supplement Analysis Transmission System Vegetation Management Program March 9, 2001 EIS-0285-SA-02: Supplement Analysis Transmission System Vegetation Management Program March 1, 2001 EIS-0189: Supplement Analysis Tank Waste Remediation System

294

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 29, 2003 April 29, 2003 EA-1367: Final Environmental Assessment White Sturgeon Mitigation and Restoration in the Columbia & Snake River Upstream from Bonneville Dam April 21, 2003 EIS-0285-SA-147: Supplement Analysis Transmission System Vegetation Management Program April 11, 2003 EIS-0286: EPA Notice of Availability of the Revised Draft Environmental Impact Statement Hanford Site Solid (Radioactive and Hazardous) Waste Program April 8, 2003 EIS-0285-SA-143: Supplement Analysis Transmission System Vegetation Management Program April 8, 2003 EIS-0285-SA-144: Supplement Analysis Transmission System Vegetation Management Program April 3, 2003 EIS-0285-SA-138: Supplement Analysis Transmission System Vegetation Management Program April 3, 2003 EIS-0285-SA-139: Supplement Analysis

295

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 9, 2002 May 9, 2002 EIS-0265-SA-78: Supplement Analysis Watershed Management Program May 8, 2002 EIS-0230: DOE Notice of Availability of the Record of Decision Electrical Interconnection of the Satsop Combustion Turbine Project April 26, 2002 EIS-0285-SA-64: Supplement Analysis Transmission System Vegetation Management Program April 22, 2002 EIS-0285-SA-63: Supplement Analysis Transmission System Vegetation Management Program, North Bonneville-Midway and Hanvor-Ostrander April 19, 2002 EIS-0285-SA-59: Supplement Analysis Transmission System Vegetation Management Program April 16, 2002 EIS-0285-SA-62: Supplement Analysis Transmission System Vegetation Management Program April 15, 2002 EIS-0285-SA-61: Supplement Analysis Transmission System Vegetation Management Program April 12, 2002

296

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 27, 1998 August 27, 1998 EA-1260: Finding of No Significant Impact Transfer of 1100 Area, Southern Rail Connection and Rolling Stock, Hanford Site, Richland, Washington August 27, 1998 EA-1260: Final Environmental Assessment and Finding of No Significant Impact Transfer of 1100 Area, Southern Rail Connection and Rolling Stock, Hanford Site, Richland, Washington August 13, 1998 EIS-0229: Notice of Availability of the Amended Record of Decision Storage and Disposition of Weapons-Usable Fissile Materials August 1, 1998 EIS-0245-SA-01: Supplement Analysis Management of Spent Nuclear Fuel from the K Basins at the Hanford Site, Richland, Washington May 1, 1998 EIS-0189: Supplement Analysis Tank Waste Remediation System July 28, 1997 EA-1203: Final Environmental Assessment Trench 33 Widening in 218-W-5 Low-level Burial Ground, Hanford Site,

297

Washington.indd  

NLE Websites -- All DOE Office Websites (Extended Search)

Washington Washington www.effi cientwindows.org March 2013 1. Meet the Energy Code and Look for the ENERGY STAR ® Windows must comply with your local energy code. Windows that are ENERGY STAR qualifi ed typically meet or exceed energy code requirements. To verify if specific window energy properties comply with the local code requirements, go to Step 2. 2. Look for Effi cient Properties on the NFRC Label The National Fenestration Rating Council (NFRC) label is needed for verifi cation of energy code compliance (www.nfrc. org). The NFRC label displays whole- window energy properties and appears on all fenestration products which are part of the ENERGY STAR program.

298

Hanford Site, Richland, Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for the Environmental for the Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington September 1992 U.S. Department of Energy Richland, Washington 99352 Contents 1 . 0 Summary . . 2.0 Purpose of and Need for the Proposed Action . . . . . . 3.0 Proposed Action and Alternatives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.1 Proposed Action 3.2 Onsite Alternatives . . . . . . . . . . 3.3 Offsite Alternatives . . . . . . . . . 3.4 No Action Alternative ~ ~ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.0 Affected Environment . . . . . . . . . . . 5.0 Environmental Impacts . . . . . . . . . . . 5.1 Construction Impacts 5.1.1 Atmospheric Impacts . . . . . . . . . . . . . . . . . . . . . . . . . 5.1.2 Terrestrial Impacts . 5.1.3 Impacts on CERCLA Remedial Actions . 5.1.4 Construction Accidents .

299

NORTH AMERICAN WATER OFFICE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NORTH AMERICAN WATER OFFICE NORTH AMERICAN WATER OFFICE P.O. Box 174 Lake Elmo, MN 55042 Phone: (612) 770-3861 Fax: (612) 770-3976 January 30, 1998 US Department of Energy Office of General Council GC-52 1000 Independence Ave. SW Washington DC 20585 RE: Preparation of Report to Congress on Price-Anderson Act Dear Office of General Council: The Price Anderson Act should be eliminated. The Price Anderson Act assumes that the encouragement and growth of the commercial nuclear industry is in the public interest. It is not. Rational evaluation of the commercial nuclear industry forces the conclusion that the Price Anderson Act simply shields the commercial nuclear industry from costs that it would otherwise, in a fair market setting, be forced to internalize and pay. Price Anderson amounts to

300

Enforcement Letter-CHWM-Washington Group-5/20/09  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2009 20, 2009 Mr. John Fulton President and Chief Executive Officer CH2M-Washington Group Idaho, LLC 2525 Fremont Street Idaho Falls, Idaho 83415-5104 Dear Mr. Fulton: In July 2008, the U.S. Department of Energy (DOE) Office of Health, Safety and Security's, Office of Enforcement was made aware of numerous, longstanding electrical safety deficiencies associated with electrical equipment located on the east side of the Idaho Nuclear Technology and Engineering Center (INTEC). The Office of Enforcement is also aware that shortly after electrical safety issues with this equipment were identified by a CH2M-Washington Group Idaho, LLC (CWI) worker in May 2007, CWI completed an Engineering Design File (EDF-8253, dated August 9, 2007). The Engineering Design File identified widespread

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Enforcement Letter, CH2M-Washington Group Idaho LLC , - May 20, 2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

M-Washington Group Idaho LLC , - May 20, M-Washington Group Idaho LLC , - May 20, 2009 Enforcement Letter, CH2M-Washington Group Idaho LLC , - May 20, 2009 May 20, 2009 Enforcement Letter issued to CH2M-Washington Group Idaho, LLC, for Electrical Safety Deficiencies at the Idaho National Laboratory In July 2008, the U.S. Department of Energy (DOE) Office of Health, Safety and Security's, Office of Enforcement was made aware of numerous, longstanding electrical safety deficiencies associated with electrical equipment located on the east side of the Idaho Nuclear Technology and Engineering Center (INTEC). The Office of Enforcement is also aware that shortly after electrical safety issues with this equipment were identified by a CH2M-Washington Group Idaho, LLC (CWI) worker in May 2007, CWI completed an Engineering Design File

302

OFFICE OF NEPA POLICY AND COMPLIANCE - STAFF DIRECTORY | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFFICE OF NEPA POLICY AND COMPLIANCE - STAFF DIRECTORY OFFICE OF NEPA POLICY AND COMPLIANCE - STAFF DIRECTORY OFFICE OF NEPA POLICY AND COMPLIANCE - STAFF DIRECTORY Carol Borgstrom, Director 202-586-4600 Carol.Borgstrom@hq.doe.gov Lettie Wormley, Secretary 202-586-4610 Lettie.Wormley@hq.doe.gov Eastern Energy and Waste Management Unit Contact Program/Responsibility Special Projects or Topics Brian Costner Brian.Costner@hq.doe.gov 202-586-9924 Unit Leader Yardena Mansoor Yardena.Mansoor@hq.doe.gov 202-586-9326 Office of Environmental Management * Oak Ridge Office * Savannah River Operations Office Office of Fossil Energy * Strategic Reserves * Liquefied Natural Gas (LNG) Office of Electricity Delivery and Energy Reliability * Champlain Hudson Power Express Western Area Power Administration Bonneville Power Administration

303

Bonneville Power Administration Nez Perce Tribal Hatchery Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17 17 Federal Register / Vol. 62, No. 203 / Tuesday, October 21, 1997 / Notices all comments received within 60 days of the date of publication of this notice. FOR FURTHER INFORMATION CONTACT: To request more information on this proposed information collection or to obtain a copy of the proposal and associated collection instruments, please write the above address, or call Department of the Army Reports clearance officer at (703) 614-0454. Title: Research to Develop a Profile of Army National Guard Members. Needs and Uses: This research will be a mail survey among Army National Guard members. The research will assist the Army National Guard (ARNG) in making the most effective use of its public relations, advertising and marketing budget for recruiting efforts. The research will help the ARNG and its

304

Washington/Incentives | Open Energy Information  

Open Energy Info (EERE)

Washington/Incentives Washington/Incentives < Washington Jump to: navigation, search Contents 1 Financial Incentive Programs for Washington 2 Rules, Regulations and Policies for Washington Download All Financial Incentives and Policies for Washington CSV (rows 1 - 184) Financial Incentive Programs for Washington Download Financial Incentives for Washington CSV (rows 1 - 163) Incentive Incentive Type Active Avista Utilities (Electric) - Commercial Lighting Energy Efficiency Program (Washington) Utility Rebate Program No Avista Utilities (Electric) - Commercial Energy Efficiency Incentives Program (Washington) Utility Rebate Program Yes Avista Utilities (Electric) - Residential Energy Efficiency Rebate Programs (Washington) Utility Rebate Program Yes Avista Utilities (Electric) - Commercial Food Equipment Rebates (Washington) Utility Rebate Program No

305

Audit Report - Office of Secure Transportation Capabilities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Secure Transportation Office of Secure Transportation Capabilities OAS-M-12-05 June 2012 Department of Energy Washington, DC 20585 June 29, 2012 UN MEMORANDUM FOR THE ASSISTANT DEPUTY ADMINISTRATOR, OFFICE OF SECURE TRANSPORTATION FROM: George W. Collard Assistant Inspector General for Audits Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Office of Secure Transportation Capabilities" BACKGROUND The National Nuclear Security Administration's Office of Secure Transportation (OST) is responsible for safely and securely transporting nuclear weapons, weapon components and special nuclear material for customers such as the Department of Energy, Department of Defense and the Nuclear Regulatory Commission. Specifically, OST shipments support the nuclear

306

International Fertilizer Development Center (IFDC) Employment Opportunity in Washington, DC  

E-Print Network (OSTI)

International Fertilizer Development Center (IFDC) Employment Opportunity in Washington, DC Science and Technology Officer - VFRC IFDC has launched the Virtual Fertilizer Research Center (VFRC), a global research, website, other media) 5. Liaison with VFRC BoA Science Committee, IFDC RDD and other technical bodies

Ma, Lena

307

Southeast Washington Subbasin Planning Ecoregion  

E-Print Network (OSTI)

. Historic (potential) central arid steppe vegetation zone in the Southeast Washington Subbasin Planning miles of central Washington and occurs in the northwest corner of the Ecoregion is the regularly spacedSoutheast Washington Subbasin Planning Ecoregion Wildlife Assessment Paul R. Ashley and Stacey H

308

Office of Science Chicago Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Chicago Office Mission, Vision and Values Mission Statement The Office of Science - Chicago Office (SC-CH) is a critical element of the Office of Science (SC) program execution and...

309

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 13, 2012 September 13, 2012 HAMMER Celebrates 15th Anniversary: Dedicates New U.S. State Department Field Exercise Building RICHLAND, Wash. - The Volpentest HAMMER Training Center, located at the Department of Energy's (DOE) Hanford Site in southeastern Washington state, will mark its 15th anniversary of operations and dedicate a new Field Exercise Building for the U.S. State Department's counterterrorism efforts. September 6, 2012 Retrieval of Ninth Single-Shell Tank Complete Richland - Washington River Protection Solutions (WRPS) has completed the retrieval of radioactive and chemical waste from single-shell tank (SST) C-104, an underground storage tank that once held 259,000 gallons of waste left over from nuclear weapons production at Hanford. WRPS is the tank

310

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 16, 2005 March 16, 2005 EIS-0312-SA-02: Supplement Analysis Fish and Wildlife Implementation Plan December 23, 2004 EIS-0183: DOE Notice of Availability of the Record of Decision Hopkins Ridge Wind Interconnection Project September 3, 2004 EIS-0346: EPA Notice of Availability of the Draft Environmental Impact Statement Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington September 3, 2004 EIS-0346: Draft Environmental Impact Statement Salmon Creek Project August 27, 2004 EIS-0349: Final Environmental Impact Statement BP Cherry Point Cogeneration Project August 27, 2004 EIS-0349: EPA Notice of Availability of the Final Environmental Impact Statement BP Cherry Point Cogeneration Project, Whatcom County, Washington

311

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 12, 2011 January 12, 2011 The carbon steel doors come together to form an upside-down L-shape. The 102-ton door was set on top of the 85-ton door that was installed at the end of December. Hanford Waste Treatment Plant Sets Massive Protective Shield door in Pretreatment Facility Richland, Wash. -- Earlier this week, an enormous protective shield door was set in the Pretreatment Facility at the Hanford Waste Treatment Plant, also known as the "Vit Plant." The 102-ton door was lowered through the roof and placed on top of an adjoining 85-ton door that was installed at the end of December. January 10, 2011 CX-007074: Categorical Exclusion Determination Washington-City-Vancouver CX(s) Applied: A1, A9, A11, B2.5, B5.1 Date: 01/10/2011 Location(s): Vancouver, Washington

312

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 26, 1997 February 26, 1997 EIS-0189: Record of Decision Tank Waste Remediation System, Hanford Site, Richland, WA December 1, 1996 EA-1111: Final Environmental Assessment K Pool Fish Rearing, Hanford Site, Richland, Washington October 21, 1996 EA-1177: Final Environmental Assessment Salvage/Demolition of 200 West Area, 200 East Area, and 300 Area Steam Plants August 1, 1996 EIS-0189: Final Environmental Impact Statement Tank Waste Remediation System, Hanford Site, Richland, Washington May 1, 1996 EIS-0244: Final Environmental Impact Statement Plutonium Finishing Plant Stabilization April 1, 1996 EIS-0259: Final Environmental Impact Statement Disposal of Decommissioned, Defueled Cruiser, Ohio Class, Los Angeles and Class Naval Reactor Plants April 1, 1996 EIS-0259: Final Environmental Impact Statement

313

Washington. DC,20585  

Office of Legacy Management (LM)

Washington. DC,20585 Washington. DC,20585 MAY' i 1995 .- The Honorable Freeman R. Bosley, Jr. ' r City Hall 1200 Narket Street St. Louis, Missouri 63103 Dear Mayor Bosley: ,'~ ,. : !' Secretary of Energy Hazel O'Leary'has announced a new approach to'openness'in " the Department of,Energy"(DOE) and its communications with the pu~blic. In 'support of this initiative, we are pleased to forward the enclosed information rel,ated to the former Petrolite Corp. site in your jurisdiction that,performed, work for DDE or,i.ts predecessor agencies. your information, use, and retention. This information is provided for DDE's Formerly Utilized Sites Remedial Action Program is responsible for identification of sites used by DDE's predecessor agencies, determining their

314

I ' Washington, DC'  

Office of Legacy Management (LM)

' Washington, DC' ' Washington, DC' 20585 The.Honorable Don Trotter, 102' Public Square Clarksville, Tennessee '37040 '_ _' ' Dear Mayor Trotter: '. Secretary of Energy Hazel .O'Leary has announced a new the Department of Energy (DOE) and its communications support of this initiative, we are pleased to forward related to the Clarksville Foundry.& Machine Co. site approach to openness in with the publ,ic'. In " the~enclosed~information in your'jurisdiction that performed work for DOE or its predecessor'agencies. This information. is provided, for.your information, use, and retention. remedial action conservative' set of technical investigations to assure environment. If'you have any questions, please feel free~to call DrI W. Alexander Uilliams 301-427-1719 of my staff.

315

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 15, 2002 October 15, 2002 EIS-0285-SA-112: Supplement Analysis Transmission System Vegetation Management Program October 6, 2002 EIS-0265-SA-92: Supplement Analysis Watershed Management Program October 2, 2002 EIS-0285-SA-110: Supplement Analysis Transmission System Vegetation Management Program October 1, 2002 EIS-0332: Mitigation Action Plan McNary-John Day Transmission Line Project September 30, 2002 EIS-025-SA-106: Supplement Analysis Transmission System Vegetation Management Program -106 SnoKing Tap to Monroe-Samamish Line) within Snohomish County, Washington September 26, 2002 EIS-0246-SA-29: Supplement Analysis Wildlife Mitigation Program, on the Spokane Indian Reservation, near Wellpinit, Stevens County, Washington September 26, 2002 EIS-0265-SA-90: Supplement Analysis

316

Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008  

DOE Green Energy (OSTI)

Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam.

Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R. L.; Fu, Tao; Skalski, J. R.; Fischer, Eric S.

2010-02-12T23:59:59.000Z

317

Competition Opens for Time on DOE Supercomputers | U.S. DOE Office...  

Office of Science (SC) Website

In Focus Presentations & Testimony Recovery Act Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202)...

318

Brief Science Highlights | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Highlights SBIRSTTR Highlights Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 Brief Science...

319

The Department of Energy's American Recovery and Reinvestment Act - Washington State Energy Program, OAS-RA-12-10  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington Washington State Energy Program OAS-RA-12-10 May 2012 Department of Energy Washington, DC 20585 May 5, 2012 MEMORANDUM FOR THE ASSISTANT SECRETARY FOR ENERGY EFFICIENCY AND RENEWABLE ENERGY FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Department of Energy's American Recovery and Reinvestment Act - Washington State Energy Program" BACKGROUND The Department of Energy's Office of Energy Efficiency and Renewable Energy (EERE) provides grants to states, territories and the District of Columbia (states) to support various energy priorities through the State Energy Program (SEP). These grants are awarded based on

320

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 19, 2002 July 19, 2002 EIS-0285-SA-95: Supplement Analysis Transmission System Vegetation Management Program July 19, 2002 EIS-0285-SA-94: Supplement Analysis Transmission System Vegetation Management Program, Covington District Substations July 19, 2002 EIS-0285-SA-96: Supplement Analysis Transmission System Vegetation Management Program, Snohomish District Substations July 19, 2002 EIS-0285-SA-71: Supplement Analysis Transmission System Vegetation Management Program, located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington July 19, 2002 EIS-0285-SA-70: Supplement Analysis Transmission System Vegetation Management Program July 8, 2002 EIS-0189: Notice of Intent Supplemental Environmental Impact Statement for Disposal of Immobilized

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 15, 2013 January 15, 2013 EA-1949: FERC Draft Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA December 27, 2012 EM's Office of River Protection has successfully removed waste from a tenth storage tank at the Hanford site. Located in C Farm, C-109 is one of 16 underground tanks ranging in capacity from 55,000 to 530,000 gallons. Retrieval of Tenth Single-shell Tank Complete at Hanford's Office of River Protection RICHLAND, Wash. - The Office of River Protection (ORP) has completed retrieval of radioactive and chemical waste from the tenth underground waste storage tank at the Hanford site. December 17, 2012 CX-009746: Categorical Exclusion Determination Upstream Ultrasonic Processing for Small Producers: Preventative Maintenance for Paraffin Management

322

Grid Modernization Highlighted in Washington DC in September with the Solar  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grid Modernization Highlighted in Washington DC in September with Grid Modernization Highlighted in Washington DC in September with the Solar Decathlon Grid Modernization Highlighted in Washington DC in September with the Solar Decathlon September 9, 2011 - 4:40pm Addthis Smart Grid is on display at the U.S. Department of Energy 2011 Solar Decathlon, held September 23 through October 2 on the National Mall, West Potomac Park, Washington, DC. The decathlon challenges collegiate teams to design, build, and operate solar-powered houses that are cost-effective, energy-efficient, and attractive. The Office of Electricity Delivery and Energy Reliability will be hosting a booth providing information on grid modernization and smart meters. From Monday September 12 through Thursday September 15, the GridWeek conference was held in Washington, DC. The Office of Electricity Delivery

323

Consent Order, Washington River Protection Solutions, LLC - NCO-2011-01 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington River Protection Solutions, LLC - Washington River Protection Solutions, LLC - NCO-2011-01 Consent Order, Washington River Protection Solutions, LLC - NCO-2011-01 May 27, 2011 Consent Order issued to Washington River Protection Solutions, LLC related to deficiencies in the corrective action management program, radiation control program, and sealed radioactive source accountability and control program The U.S. Department of Energy (DOE) Office of Health, Safety and Security's Office of Enforcement and Oversight has completed its investigation into the facts and circumstances associated with identified deficiencies in the Washington River Protection Solutions, LLC (WRPS) corrective action management program, radiation control program, and sealed radioactive source accountability and control program. DOE views these programs as

324

Alternative Fuels Data Center: Washington Information  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Washington Information Washington Information to someone by E-mail Share Alternative Fuels Data Center: Washington Information on Facebook Tweet about Alternative Fuels Data Center: Washington Information on Twitter Bookmark Alternative Fuels Data Center: Washington Information on Google Bookmark Alternative Fuels Data Center: Washington Information on Delicious Rank Alternative Fuels Data Center: Washington Information on Digg Find More places to share Alternative Fuels Data Center: Washington Information on AddThis.com... Washington Information This state page compiles information related to alternative fuels and advanced vehicles in Washington and includes new incentives and laws, alternative fueling station locations, truck stop electrification sites, fuel prices, and local points of contact.

325

CX-010429: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Harbour Pointe Small Generator Integration CX(s) Applied: B1.7 Date: 06/25/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

326

CX-010421: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Bell-Boundary Fiber Project CX(s) Applied: B4.7 Date: 06/11/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

327

CX-010720: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Monroe-Custer #2 Access Roads CX(s) Applied: B1.3 Date: 08/26/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

328

CX-010725: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

2013 Ross Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 08/19/2013 Location(s): Washington, Washington, Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration

329

CX-010424: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Grand Coulee District Wood Replacement CX(s) Applied: B1.3 Date: 06/07/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

330

CX-010166: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Wenatchee District Wood Pole Replacements CX(s) Applied: B1.3 Date: 03/22/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

331

Office of Information Resources  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EXECUTIVE COURT REPORTERS, INC. EXECUTIVE COURT REPORTERS, INC. (301) 565-0064 1 NATIONAL COAL COUNCIL 2007 FALL FULL COUNCIL MEETING Hilton Washington Embassy Row 2015 Massachusetts Avenue, NW Washington, D.C. 8:30 a.m. Wednesday, November 14, 2007 EXECUTIVE COURT REPORTERS, INC. (301) 565-0064 2 I N D E X AGENDA ITEM: PAGE: Welcome and Opening Remarks 3 NCC Chair Georgia Nelson Remarks 7 Under Secretary of Energy Bud Albright Council Business 12 Presentation on Department of Defense CTL 21 Projects Roger Bezdek, President Management Information Services, Inc. Presentation on the Development and 43 Commercialization of the TIPS Oxy-Fuel Process Alex Fassbender, Chief Technology Officer and Executive Vice President

332

SBOT WASHINGTON PACIFIC NORTHWEST LAB POC Kerry T. Bass Telephone  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WASHINGTON WASHINGTON PACIFIC NORTHWEST LAB POC Kerry T. Bass Telephone (509) 371-7526 Email kerry.bass@pnl.gov ADMINISTATIVE / WASTE / REMEDIATION Facilities Support Services 561210 Employment Placement Agencies 561311 Temporary Help Services 561320 Professional Employer Organizations 561330 Document Preparation Services 561410 Security Guards and Patrol Services 561612 Security Systems Services (except Locksmiths) 561621 Janitorial Services 561720 Landscaping Services 561730 Hazardous Waste Treatment and Disposal 562211 Remediation Services 562910 Materials Recovery Facilities 562920 All Other Miscellaneous Waste Management Services 562998 Office machine repair and maintenance services (except communication equipment) 811212 Communication equipment repair and maintenance services 811213 Precision equipment calibration and repair and maintanence services

333

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 27, 2009 October 27, 2009 CX-000165: Categorical Exclusion Determination California County Contra Costa CX(s) Applied: A9, A11, B5.1 Date: 10/27/2009 Location(s): Contra Costa County, California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office October 27, 2009 CX-000167: Categorical Exclusion Determination Texas County Montgomery CX(s) Applied: A9, A11, B5.1 Date: 10/27/2009 Location(s): Montgomery County, Texas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office October 27, 2009 CX-000169: Categorical Exclusion Determination Washington County Clark CX(s) Applied: A9, A11, B5.1 Date: 10/27/2009 Location(s): Clark County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office October 27, 2009 CX-000168: Categorical Exclusion Determination

334

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 18, 2009 November 18, 2009 CX-000195: Categorical Exclusion Determination Washington County Pierce CX(s) Applied: A9, A11, B5.1 Date: 11/18/2009 Location(s): Pierce County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 18, 2009 CX-000194: Categorical Exclusion Determination Ohio City Cincinnati CX(s) Applied: A9, A11, B5.1 Date: 11/18/2009 Location(s): Cincinnati, Ohio Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 18, 2009 CX-000193: Categorical Exclusion Determination New York City Buffalo CX(s) Applied: A9, B5.1 Date: 11/18/2009 Location(s): Buffalo, New York Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 18, 2009 CX-000192: Categorical Exclusion Determination

335

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2010 0, 2010 CX-002559: Categorical Exclusion Determination Washington Credit Enhancement CX(s) Applied: B5.1 Date: 05/20/2010 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 20, 2010 CX-002492: Categorical Exclusion Determination Southern Illinois University Carbondale: Stone Center Geothermal CX(s) Applied: B5.1 Date: 05/20/2010 Location(s): Carbondale, Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 20, 2010 CX-002491: Categorical Exclusion Determination Champaign Unit 4 School District: Westview Elementary School - Ground Source Heat Pump Project CX(s) Applied: B5.1 Date: 05/20/2010 Location(s): Champaign, Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

336

Bonneville Seabase Scuba Dive Pool Pool & Spa Low Temperature Geothermal  

Open Energy Info (EERE)

Seabase Scuba Dive Pool Pool & Spa Low Temperature Geothermal Seabase Scuba Dive Pool Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Bonneville Seabase Scuba Dive Pool Pool & Spa Low Temperature Geothermal Facility Facility Bonneville Seabase Scuba Dive Pool Sector Geothermal energy Type Pool and Spa Location Grantsville, Utah Coordinates 40.5999425°, -112.4643988° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

337

Bonneville Project Act, Federal Columbia River Transmission System Act and Other Related Legislation.  

DOE Green Energy (OSTI)

Legislative texts are provided for: Bonneville Project Act which authorizes the completion, maintenance, and operation of Bonneville project for navigation, and for other purposes; Federal Columbia River Transmission system Act which enables the Secretary of the Interior to provide for operation, maintenance, and continued construction of the Federal transmission system in the Pacific Northwest by use of the revenues of the Federal Columbia River Power System and the proceeds of revenue bonds, and for other purposes; public law 88--552 which guarantees electric consumers of the Pacific Northwest first call on electric energy generated at Federal hydroelectric plants in that regions and reciprocal priority, and for other purposes; and public law 78--329 which provides for the partial construction of the Hungary Horse Dam on the South Fork of the Flathead River in the state of Montana, and for other purposes

Not Available

1985-01-01T23:59:59.000Z

338

White Sturgeon Mitigation & Restoration in the Columbia & Snake River Upstream from Bonneville Dam  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29, 2003 29, 2003 To: People Interested in the Project to Mitigate and Restore White Sturgeon Populations in the Columbia and Snake Rivers Bonneville Power Administration (BPA) has prepared the Final Environmental Assessment (EA), which includes a Finding of No Significant Impact (FONSI), for the White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Project. The document is enclosed for your information. Background: Since 1986, State, Federal, and Tribal fisheries agencies have been gathering data and studying habitats, movements, population dynamics, feeding, and distribution of white sturgeon in the Columbia River system. With the decline in anadromous salmonid runs there has been an increase in the importance of the white sturgeon fisheries. The Oregon Department of

339

Washington Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Washington nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State...

340

Categorical Exclusion Determinations: Washington | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX-009223: Categorical Exclusion Determination CH2MHill Plateau Remediation Company - Asbestos Removal Actions CX(s) Applied: B1.16 Date: 08032012 Location(s): Washington...

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012  

SciTech Connect

The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.

2013-05-01T23:59:59.000Z

342

Office of Inspector General audit report on credit card usage at the Ohio Field Office and the Fernald and Miamisburg Environmental Management Projects  

SciTech Connect

In 1994 the Department of Energy (Department) obtained the services of Rocky Mountain BankCard System, through the use of a General Services Administration contract, as a means for the Department and its contractors to make small purchases. The use of credit cards was expected to simplify small purchase procedures and improve cash management. The Ohio Field Office (Field Office) uses the credit card system and oversees usage by its area offices. Contractors under the Field Office also use the credit card system to make small purchases. The Office of Inspector General (OIG) has issued one audit report concerning the use of credit cards. In April 1996, the OIG issued Report WR-B-96-06, Audit of Bonneville Power Administration`s Management of Information Resources. The audit concluded that improvements could be made in implementing credit card and property procedures in Bonneville`s management of computer-related equipment. Specifically, many credit card purchases were made by employees whose authority to buy was not properly documented, and the purchasing files often lacked invoices that would show what was purchased. Additionally, some cardholders split purchases to avoid credit card limits. The objective of this audit was to determine whether the Field Office, Fernald and Miamisburg Environmental Management Projects, Fluor Daniel, and B and W were using credit cards for the appropriate purposes and within the limitations established by Federal and Departmental regulations.

1999-03-01T23:59:59.000Z

343

Offices | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Offices Offices Offices All Offices Program Offices Advanced Research Projects Agency - Energy Loan Programs Office Office of Electricity Delivery & Energy Reliability Office of Energy Efficiency & Renewable Energy Office of Environmental Management Office of Fossil Energy Office of Indian Energy Policy and Programs Office of Legacy Management Office of Nuclear Energy Office of Science Staff Offices Office of Congressional and Intergovernmental Affairs Office of Economic Impact and Diversity Office of Energy Policy and Systems Analysis Office of Health, Safety and Security Office of Hearings and Appeals Office of Inspector General Office of Intelligence and Counterintelligence Office of Management Office of NEPA Policy and Compliance Office of Policy and International Affairs

344

Microsoft Word - CX-NorthBonneville75-4ReplacementWenatcheeFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR/Pasco KEPR/Pasco SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TEP-TPP-1 Proposed Action: North Bonneville-Midway No. 1 Tower 75/4 Replacement PP&A Project No.: 2410 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: The work associated with this project will take place in the areas shown in the table below: Transmission Line/ROW Structure # Township Range Section County, State North Bonneville- Midway #1 75/4 6N 17E 14, 23 Klickitat, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace tower 75/4 on the North Bonneville-Midway No. 1 230-kilovolt (kV) transmission line to ensure the continued safe and

345

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 19, 2013 June 19, 2013 A Hanford site volunteer helps a Boy Scout practice the Pull, Aim, Squeeze, Sweep, or PASS, fire extinguishing technique at the Volpentest HAMMER Training & Education Center in Richland. Local Scouts Train with Hanford Safety Experts - 52 Boy Scouts Earn Merit Badges at the HAMMER Training Facility RICHLAND, Wash. - Hanford site services contractor Mission Support Alliance (MSA) hosted a unique opportunity for 52 local Boy Scouts at the Volpentest HAMMER Training & Education Center during two consecutive weekends recently. June 14, 2013 EA-1562-SA-1: Supplement Analysis Final Environmental Assessment of Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington June 4, 2013

346

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 2, 2004 August 2, 2004 EIS-0349: Final Environmental Impact Statement, Volume 2 BP Cherry Point Cogeneration Project Volume 2 August 2, 2004 EIS-0349: Final Environmental Impact Statement, Figures BP Cherry Point Cogeneration Project August 2, 2004 EIS-0349: Final Environmental Impact Statement, Appendices BP Cherry Point Cogeneration Project June 23, 2004 EIS-0026-SA-02: Supplement Analysis Disposal of Polychlorinated Biphenyl-Commingled Transuranic Waste at the Waste Isolation Pilot Plant April 7, 2004 EIS-0169-SA-08: Supplement Analysis Yakima/Klickitat Fisheries Project, Boone Pond Acclimation Site, Cle Elum, Kittitas County, Washington March 12, 2004 EA-1486: Final Environmental Assessment East and West Diversion Screening Proposal Methow Valley Irrigation District Project

347

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 14, 2001 December 14, 2001 EIS-0285-SA-35: Supplement Analysis Transmission System Vegetation Management Program December 3, 2001 EIS-0265-SA-72: Supplement Analysis Watershed Management Program - Yakima Basin Side Channels Project, Scatter Creek/Plum Creek Land Acquisition Phase II December 3, 2001 EIS-0285-SA-34: Supplement Analysis Transmission System Vegetation Management Program November 15, 2001 EIS-0285-SA-32: Supplement Analysis Watershed Management Program - Walla Walla County, Washington November 15, 2001 EIS-0265-SA-69: Supplement Analysis Watershed Management Program October 29, 2001 EIS-0265-SA-71: Supplement Analysis Watershed Management Program - Duncan Creek Channel Rehabilitation Project October 23, 2001 EIS-0265-SA-70: Supplement Analysis Watershed Management Program - Yakima Basin Side Channels Project, Scatter

348

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 29, 2006 November 29, 2006 EIS-0183: Record of Decision Electrical Interconnection of the Windy Point Wind Energy Project June 26, 2006 EIS-0397: Notice of Intent to Prepare an Environmental Impact Statement and Notice of Floodplain and Wetlands Involvement Lyle Falls Fishway Project May 1, 2006 EIS-0384: Draft Environmental Impact Statement Chief Joseph Hatchery Program March 31, 2006 EA-1547: Finding of No Significant Impact Fast Flux Test Facility Project, Hanford Site March 1, 2006 EA-1547: Final Environmental Assessment Sodium Residual Reaction/Removal and Other Deactivation Work Activities, Fast Flux Test Facility Project, Hanford Site, Richland, Washington February 17, 2006 EIS-0391: Notice to Extend Scoping Period Tank Closure and Waste Management for the Hanford Site, Richland, WA

349

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18, 2011 18, 2011 Hanford to Host ISMS Safety Workshop in Kennewick: Abstracts Due in June for September Event RICHLAND, WASH. - The U.S. Department of Energy (DOE) at Hanford will hold its annual DOE Integrated Safety Management (ISM) Champions Workshop on September 12-15, 2011, at the Three Rivers Convention Center in Kennewick, Wash. May 17, 2011 EA-1731: Final Environmental Assessment Walla Walla-Tucannon River Transmission Line Rebuild Project, Walla Walla and Columbia Counties, Washington May 17, 2011 EA-1731: Mitigation Acton Plan Walla Walla-Tucannon River Transmission Line Rebuild Project May 17, 2011 EA-1731: Finding of No Significant Impact Walla Walla-Tucannon River Transmission Line Rebuild Project May 13, 2011 CX-005809: Categorical Exclusion Determination

350

Departmentaf Energy Washington, DC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Departmentaf Departmentaf Energy Washington, DC 20585 MAR 4 1998 MEMORANDUM FOR: James H. Chafin, AL Robert Fisher, CH Steven Hamel, OR William Daubenspeck, LL James Hanley, SAN Robert Southworth, RL Harold Dixon, SR \ Lisa Jarr, FETC"/"',,,-' ( ~ ( ) ( I C{ \'"~V FROM: Paul A. Gottlieb'<,. ~ ' \ Assistant General Counsel . for Technology Transfer / and Intellectual Property SUBJECT: U.S. Competitiveness Provision. Except for the cases discussed further below, attached is the U.S. Competitiveness provision which you should begin providing as our initial negotiating position to inventors/contractors requesting identified and, advance patent waivers. Of course, it is not· expected that every inventor/contractor will agree to the exact language in the provision, in which case modifications to the provision can be made. In those cases where substantial changes are contemplated,

351

Washington, DC,20585  

Office of Legacy Management (LM)

>/gGq ' >/gGq ' ,, ' .. Department of Edgy Washington, DC,20585 ,I ' , APR 0 4 1995 The Honorable Patrick Ungaro 26 S. Phelps Street Youngstown, Ohio 44503 .' Dear );layor.Ungaro: Secretary of'Energy Hazel O'Leary has announced a new approach to openness in the Oepartment of Energy (DOE) and its coannunications with the public. In support of this initiative, we are pleased to forward the,enclosed information related to the former Ajax-Hagnethermic C,orp. site in your jurisdiction that performed work for DOE's predecessoragencies. This information is~provided for your information, use, and retention. DOE's Formerly Utilized Sites Remedial Action Program is responsible for identificationof sites used by DOE's predecessor agencies, determining their current radiological condition and, where it has authority, performing-

352

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 12, 2003 February 12, 2003 EIS-0286: Notice of Intent Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement, Richland, WA February 12, 2003 EIS-0285-SA-121: Supplement Analysis Transmission System Vegetation Management Program February 10, 2003 EIS-0285-SA-120: Supplement Analysis Transmission System Vegetation Management Program, Benton County, Washington January 31, 2003 EIS-0325: EPA Notice of Availability of the Final Environmental Impact Statement Schultz-Hanford Transmission Line Project January 29, 2003 EIS-0285-SA-119: Supplement Analysis Transmission System Vegetation Management Program, Snohomish-Murray No. 1 Transmission Line January 27, 2003 EIS-0285-SA-118: Supplement Analysis Transmission System Vegetation Management Program, Holcomb-Naselle 115kV,

353

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 16, 2004 January 16, 2004 EIS-0246-SA-37: Supplement Analysis Wildlife Mitigation Program, On the Spokane Indian Reservation, near Wellpinit, Stevens County, Washington November 10, 2003 EIS-0349: Record of Decision Electrical Interconnection of the BP Cherry Point Cogeneration Project October 2, 2003 EA-0307-SA-01: Supplement Analysis Colville Resident Trout Hatchery Project Supplement Analysis September 5, 2003 EIS-0349: Draft Environmental Impact Statement BP Cherry Point Cogeneration Project July 21, 2003 EIS-0317: Record of Decision Kangley-Echo Lake Transmission Line Project July 14, 2003 EIS-1069-SA-07: Supplement Analysis Yakima/Kilickitat Fisheries Project, Noxious Weed Control at Cle Elum and Jack Creek, Cle Elum Supplementation and Research Facility and Jack Creek

354

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 17, 2001 August 17, 2001 EIS-0285-SA-23: Supplement Analysis Transmission System Vegetation Management Program August 17, 2001 EIS-0285-SA-22: Supplement Analysis Transmission System Vegetation Management Program, King and Snohomish Counties, WA, in the Snohomish Region August 14, 2001 EIS-0265-SA-59: Supplement Analysis Watershed Management Program August 7, 2001 EIS-0265-SA-58: Supplement Anlalysis Watershed Program - Asotin Creek Channel, Floodplain and Riparian Restoration August 2, 2001 EIS-0285-SA-20: Supplement Analysis Transmission System Vegetation Management Program August 1, 2001 EIS-0245-SA-02: Supplement Analysis Management of Spent Nuclear Fuel from the K Basins at the Hanford Site, Richland, Washington July 24, 2001 EIS-0285-SA-17: Supplement Analysis Transmission System Vegetation Management Program

355

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 5, 2002 September 5, 2002 EIS-0285-SA-107: Supplement Analysis Transmission System Vegetation Management Program September 2, 2002 EIS-0169-SA-05: Supplement Analysis Yakima/Klickitat Fisheries Project, Cle Elum, Kittitas County, Washington August 30, 2002 EIS-0332: Final Environmental Impact Statement McNary-John Day Transmission Line Project August 29, 2002 EIS-0285-SA-99: Supplement Analysis Transmission System Vegetation Management Program Final Environmental Impact Statement - Olympia-Grand Coulee No.1 August 22, 2002 EIS-0285-SA-105: Supplement Analysis Transmission System Vegetation Management Program August 21, 2002 EIS-0285-SA-104: Supplement Analysis Transmission System Vegetation Management Program August 1, 2002 EIS-0344: Draft Envrionmental Impact Statement

356

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2011 2, 2011 CX-004962: Categorical Exclusion Determination California-City-Mission Viejo CX(s) Applied: B1.32, B5.1 Date: 01/12/2011 Location(s): Mission Viejo, California Office(s): Energy Efficiency and Renewable Energy January 12, 2011 CX-004961: Categorical Exclusion Determination California-City-Garden Grove CX(s) Applied: B5.1 Date: 01/12/2011 Location(s): Garden Grove, California Office(s): Energy Efficiency and Renewable Energy January 11, 2011 CX-005002: Categorical Exclusion Determination Washington-Tribal Energy Program-Lummi Indian Business Council CX(s) Applied: A9, A11, B3.1 Date: 01/11/2011 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy January 11, 2011 CX-005001: Categorical Exclusion Determination Vermont-County-Washington CX(s) Applied: A9, A11, B5.1

357

Total Dissolved Gas Monitoring in Chum Salmon Spawning Gravels Below Bonneville Dam  

DOE Green Energy (OSTI)

At the request of the U.S. Army Corps of Engineers (Portland District), Pacific Northwest National Laboratory (PNNL) conducted research to determine whether total dissolved gas concentrations are elevated in chum salmon redds during spring spill operations at Bonneville Dam. The study involved monitoring the total dissolved gas levels at egg pocket depth and in the river at two chum salmon spawning locations downstream from Bonneville Dam. Dissolved atmospheric gas supersaturation generated by spill from Bonneville Dam may diminish survival of chum (Oncorhynchus keta) salmon when sac fry are still present in the gravel downstream from Bonneville Dam. However, no previous work has been conducted to determine whether total dissolved gas (TDG) levels are elevated during spring spill operations within incubation habitats. The guidance used by hydropower system managers to provide protection for pre-emergent chum salmon fry has been to limit TDG to 105% after allowing for depth compensation. A previous literature review completed in early 2006 shows that TDG levels as low as 103% have been documented to cause mortality in sac fry. Our study measured TDG in the incubation environment to evaluate whether these levels were exceeded during spring spill operations. Total dissolved gas levels were measured within chum salmon spawning areas near Ives Island and Multnomah Falls on the Columbia River. Water quality sensors screened at egg pocket depth and to the river were installed at both sites. At each location, we also measured dissolved oxygen, temperature, specific conductance, and water depth to assist with the interpretation of TDG results. Total dissolved gas was depth-compensated to determine when levels were high enough to potentially affect sac fry. This report provides detailed descriptions of the two study sites downstream of Bonneville Dam, as well as the equipment and procedures employed to monitor the TDG levels at the study sites. Results of the monitoring at both sites are then presented in both text and graphics. The findings and recommendations for further research are discussed, followed by a listing of the references cited in the report.

Arntzen, Evan V.; Geist, David R.; Panther, Jennifer L.; Dawley, Earl

2007-01-30T23:59:59.000Z

358

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 30, 2013 July 30, 2013 Matt McCormick, manager of the Richland Operations Office, commends a large group of Hanford workers for the 15-million-ton milestone at a public event at the Environmental Restoration Disposal Facility. Disposal Facility Reaches 15-Million-Ton Milestone RICHLAND, Wash. - EM's Environmental Restoration Disposal Facility (ERDF) - a massive landfill for low-level radioactive and hazardous waste at the Hanford site - has achieved a major cleanup milestone. July 30, 2013 Energy Secretary Ernest Moniz tours the 200 West Pump and Treat System, which treats chemical and radionuclide contamination in Hanford's groundwater. Pictured, left to right, are Special Assistant to the Secretary Mark Appleton, Bob Popielarczyk of CH2M HILL Plateau Remediation Company, Special Assistant to the Secretary T.J. Augustine, Secretary Ernest Moniz, EM Senior Advisor Dave Huizenga and DOE Richland Operations Office Deputy Manager Doug Shoop.

359

Badge Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Badge Office Badge Office Badge Office The central point where badges are issued to employees and official visitors. Contact Badge Office (505) 667-6901 Email Badge Office location As the central point where badges are issued to employees and official visitors, the Badge Office is located on the second floor of the Otowi Building (TA-3, Bldg. 261). Badge Office map Printable 2-page map to the Badge Office (pdf) More maps and directions Badge Office hours Monday-Friday: 7:30 am - 4 pm Wednesday: Closed 11 am - 12:30 pm Badge requirements US citizen employees must present a photo ID and proof of US citizenship. See Security Smart on Proof of United States Citizenship for the Badge Office (pdf). Foreign national guests and employees must have an approved visit and present a valid passport and documentation of US legal status and work

360

Microsoft Word - washington.doc  

Gasoline and Diesel Fuel Update (EIA)

Washington Washington NERC Region(s) ....................................................................................................... WECC Primary Energy Source........................................................................................... Hydroelectric Net Summer Capacity (megawatts) ....................................................................... 30,478 10 Electric Utilities ...................................................................................................... 26,498 5 Independent Power Producers & Combined Heat and Power ................................ 3,979 26 Net Generation (megawatthours) ........................................................................... 103,472,729 15

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Biofuels in Oregon and Washington  

E-Print Network (OSTI)

PNNL-17351 Biofuels in Oregon and Washington A Business Case Analysis of Opportunities and Challenges Prepared by Pacific Northwest National Laboratory #12;#12;Biofuels in Oregon and Washington, particularly in light of the recent growth experienced by the biofuels industry in the Midwest. Policymakers

362

Washington | Building Energy Codes Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Washington Washington Last updated on 2013-11-05 Current News The Washington State Building Code Council recently completed deliberations on adoption and amendment of the 2012 codes. This includes adoption of the 2012 IECC with state amendments. The new codes became effective July 1, 2013. Commercial Residential Code Change Current Code State Specific Amendments / Additional State Code Information WA 2012 Nonresidential Codes Approved Compliance Tools Nonresidential Energy Code Compliance Tools Approximate Energy Efficiency Equivalent to ASHRAE 90.1-2010 Effective Date 07/01/2013 Adoption Date 02/01/2013 Code Enforcement Mandatory DOE Determination ASHRAE 90.1-2007: Yes ASHRAE 90.1-2010: Yes Washington DOE Determination Letter, May 31, 2013 Washington State Certification of Commercial and Residential Building Energy Codes

363

Categorical Exclusion Determinations: Office of River Protection-Richland  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14, 2012 14, 2012 CX-009693: Categorical Exclusion Determination CH2MHill Plateau Remediation Company - Site Characterization and Environmental Monitoring, December 2012 to December 2013 CX(s) Applied: B3.1 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 14, 2012 CX-009692: Categorical Exclusion Determination CH2MHill Plateau Remediation Company - Cleanup Actions, December 2012 to December 2013 CX(s) Applied: B6.1 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 14, 2012 CX-009673: Categorical Exclusion Determination Washington River Protection Solutions LLC - Facility Safety and Environmental Improvements CX(s) Applied: B2.5 Date: 12/14/2012 Location(s): Washington

364

Web Policies | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Web Policies Web Measurement and Tracking Opt-Out Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202)...

365

2008 | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

2011 2010 2009 2008 Recovery Act Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 Presentations &...

366

PECASE | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

PECASE Transcribed Media 2012 Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 Honors and Awards...

367

About | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Media Honors and Awards Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 About Print Text...

368

2012 | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

PECASE 2012 Transcribed Media Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 PECASE 2012 Print...

369

Feedback | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Feedback Feedback Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 Print Text Size: A A A RSS Feeds...

370

2005 | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

& Testimony Recovery Act Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 In the News 2005...

371

2005 | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 In Focus 2005 Print Text Size: A A A RSS Feeds...

372

Washington DC | OpenEI Community  

Open Energy Info (EERE)

Washington DC Home Linked Open Data Workshop in Washington, D.C. Description: A group organizing the LOD workshop in Washington, D.C. in fall 2012 A follow-up event to the...

373

Washington Datos del Precio de la Gasolina  

NLE Websites -- All DOE Office Websites (Extended Search)

WashingtonGasPrices.com (Busqueda por Ciudad o Cdigo Postal) - GasBuddy.com Washington Gas Prices (Ciudades Selectas) - GasBuddy.com Washington Gas Prices (Organizado por...

374

News From the D.C. Office: Monitored Savings from Energy-Efficient Lighting  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Aerial view of Washington D.C. 3 Aerial view of Washington D.C. News From the D.C. Office Monitored Savings from Energy-Efficient Lighting in D.C. Office More on the DC Office efficiency up-grade: Office Equipment: Part 1, Part 2 Figure 1: Lighting energy use profile for a typical exterior office. Berkeley Lab's office in Washington, D.C. is located a few blocks from DOE headquarters, in a five-year-old office building constructed mainly for lease to Federal agencies and their contractors. Despite its recent vintage, the building's standard lighting specifications were far from today's best, cost-effective practice. In designing the build-out plans for offices and meeting rooms in our 7,500-square-foot suite, we wanted to showcase some of the energy-efficient lighting and office equipment developed for DOE's Building Technologies

375

Building Technologies Office: 2013 DOE Building Technologies Office Program  

NLE Websites -- All DOE Office Websites (Extended Search)

2013 DOE Building Technologies Office Program Review 2013 DOE Building Technologies Office Program Review The 2013 Department of Energy (DOE) Building Technologies Office Program Review was held April 2-4, 2013 in Washington, DC. This inaugural review encompassed active work done by the Building Technologies Office (BTO), with a total of 59 individual activities reviewed. Sixty independent experts assessed the progress and contributions of each project toward BTO's mission and goals, and these assessments will be used to enhance the management of existing efforts, gauge the effectiveness of projects, and design future programs. The meeting also provided an opportunity to promote collaborations, partnerships, and technology transfers. 2013 Program Peer Review Report | 2013 Program Peer Review Presentations

376

Washington Wildlife Mitigation Projects : Final Programmatic Environmental Assessment and Finding of No Significant Impact.  

DOE Green Energy (OSTI)

Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities.

United States. Bonneville Power Administration; Washington (State). Dept. of Fish and Wildlife.

1996-08-01T23:59:59.000Z

377

United States General Accounting Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington, DC 20548 Washington, DC 20548 Comptroller General of the United States Decision Matter of: The Jones/Hill Joint Venture File: B-286194.4; B-286194.5; B-286194.6 Date: December 5, 2001 William A. Roberts III, Esq., Phillip H. Harrington, Esq., William S. Lieth, Esq., and Janet L. Eichers, Esq., Wiley, Rein & Fielding, for the protester. Marvin D. Norman, Esq., Vicki E. O'Keefe, Esq., and Robert E. Little, Jr., Esq., Department of the Navy, for the agency. Louis A. Chiarella, Esq., John L. Formica, Esq., and James A. Spangenberg, Esq., Office of the General Counsel, GAO, participated in the preparation of the decision. DIGEST 1. A conflict of interest existed in an Office of Management and Budget Circular A-76 commercial activities study where a Navy employee and a private-sector consultant

378

Washington Joint Aquatic Resources Permit Application (JARPA...  

Open Energy Info (EERE)

Washington Joint Aquatic Resources Permit Application (JARPA) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Washington Joint...

379

Washington Gas Energy Services | Open Energy Information  

Open Energy Info (EERE)

Washington Gas Energy Services (Redirected from WGES) Jump to: navigation, search Name Washington Gas Energy Services Place Virginia Utility Id 20659 Utility Location Yes Ownership...

380

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 and 2 Transmission Line Corridor CX(s) Applied: B1.3 Date: 03032011 Location(s): Clark County, Washington Office(s): Bonneville Power Administration http:energy.govnepa...

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Road Construction: 151 to 152 CX(s) Applied: B1.13 Date: 06082010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration http:energy.govnepa...

382

Standards Coordination Office Homepage  

Science Conference Proceedings (OSTI)

Standards Coordination Office. ... About the Standards Coordination Office (SCO). The Standards Coordination Office of the ...

2013-07-31T23:59:59.000Z

383

DOE NEPA Compliance Officers  

Energy.gov (U.S. Department of Energy (DOE))

NEPA Compliance Officers are listed first for Program Offices, then Power Marketing Administrations, then Field Offices.

384

Survival of Juvenile Chinook Salmon Passing the Bonneville Dam Spillway in 2007  

DOE Green Energy (OSTI)

The U.S. Army Corps of Engineers Portland District (CENWP) funds numerous evaluations of fish passage and survival on the Columbia River. In 2007, the CENWP asked Pacific Northwest National Laboratory to conduct an acoustic telemetry study to estimate the survival of juvenile Chinook salmon passing the spillway at Bonneville Dam. This report documents the study results which are intended to be used to improve the conditions juvenile anadromous fish experience when passing through the dams that the Corps operates on the river.

Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Zimmerman, Shon A.; Durham, Robin E.; Fischer, Eric S.; Kim, Jina; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; McComas, Roy L.

2008-12-01T23:59:59.000Z

385

Survival Rates of Juvenile Salmonids Passing Through the Bonneville Dam and Spillway in 2008  

DOE Green Energy (OSTI)

This report describes a 2008 acoustic telemetry survival study conducted by the Pacific Northwest National Laboratory for the Portland District of the U.S. Army Corps of Engineers. The study estimated the survival of juvenile Chinook salmon and steelhead passing Bonneville Dam (BON) and its spillway. Of particular interest was the relative survival of smolts detected passing through end spill bays 1-3 and 16-18, which had deep flow deflectors immediately downstream of spill gates, versus survival of smolts passing middle spill bays 4-15, which had shallow flow deflectors.

Ploskey, Gene R.; Weiland, Mark A.; Faber, Derrek M.; Deng, Zhiqun; Johnson, Gary E.; Hughes, James S.; Zimmerman, Shon A.; Monter, Tyrell J.; Cushing, Aaron W.; Wilberding, Matthew C.; Durham, Robin E.; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.; McComas, Roy L.; Everett, Jason

2009-12-28T23:59:59.000Z

386

HUBZone Business Opportunity Session to be held on July 29 in Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HUBZone Business Opportunity Session to be held on July 29 in HUBZone Business Opportunity Session to be held on July 29 in Washington D.C HUBZone Business Opportunity Session to be held on July 29 in Washington D.C July 12, 2013 - 10:58am Addthis HUBZone Business Opportunity Session to be held on July 29 in Washington D.C John Hale III John Hale III Director, Office of Small and Disadvantaged Business Utilization The Department of Energy's Office of Small and Disadvantaged Business Utilization is hosting a Business Opportunity Session. Please join us on Monday, July 29, 2013 from 9:00am - 3:00pm for the U.S. Department of Energy Business Opportunity Session at the Department of Energy in Washington, D.C. Registration is required - register by emailing smallbusiness@hq.doe.gov HUBZone and other small business owners will have the opportunity to

387

http://www.whitehouse.gov/the-press-office/communiqu-washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

security, requesting and providing assistance as necessary; 3. Recognize that highly enriched uranium and separated plutonium require special precautions and agree to promote...

388

NREL: About NREL - Washington, D.C. Office  

NLE Websites -- All DOE Office Websites (Extended Search)

here Report a problem - Maps Labs - Help Google Maps - 2014 Google - Terms of Use - Privacy Report a problem - Maps Labs - Help Google Maps - 2014...

389

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 8, 2012 March 8, 2012 Fifth Chapter of Hanford Story Released to Public: Chapter Dedicated to Potential Future Uses of the Hanford Site RICHLAND, Wash. - The Department of Energy is releasing the fifth chapter of The Hanford Story video series to the public today. March 1, 2012 The new resin was installed at the 100-DX Groundwater Treatment Facility, where it operated over one year without a single resin change. New Resin Improves Efficiency, Reduces Costs in Hanford Site Groundwater Treatment RICHLAND, Wash. - A new resin EM, the Richland Operations Office, and contractor CH2M HILL Plateau Remediation Company are using in contaminated groundwater treatment is expected to increase efficiency and reduce costs in the operation of pump-and-treat facilities along the Columbia River at

390

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2011 7, 2011 Hanford Projects Receive Sustainability Awards RICHLAND, WASH. - Hanford's Department of Energy offices and their contractors received special recognition Tuesday for their part in promoting sustainability. June 2, 2011 Nathan Baker | Photo Courtesy of PNNL 10 Questions for a Signature Scientist: Nathan Baker Find out how he's working to advance the innovative application of data analytics and algorithms to real-world challenges, ranging from smart grids and bioforensics to nuclear non-proliferation and medical treatments. June 2, 2011 Hanford Surpasses Transuranic Waste Milestone: 1,000 Cubic Meters Shipped Four Months Ahead of Schedule RICHLAND, WASH. - The U.S. Department of Energy (DOE) at Hanford surpassed a Tri-Party Agreement Milestone by four months in shipping 1,000

391

Recovery Act State Memos Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington Washington For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 6

392

Ferrin Moore, Senior Aviation Policy Officer  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ferrin Moore Ferrin Moore Title: Senior Aviation Policy Officer Organization: Office of Aviation Management/MA-30 Address: Headquarters, United States Department of Energy 1000 Independence Avenue S.W. Washington, D.C. 20585 E-mail Address: Ferrin.Moore@hq.doe.gov Phone Number: Office: (202) 586-6171, Mobile: Fax Number: (202) 586-6008 Biographical Summary: Ferrin Moore is a highly experience aviation manager and leader with 30 years of aviation experience in the private and government sector. Prior to joining the Office of Aviation Management Ferrin served 15 years with the Federal Aviation Administration as an Aviation Safety Inspector and Manager. While in the private sector, he worked for United Airlines Maintenance Division in San Francisco and Washington D.C.

393

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2009 2, 2009 CX-000172: Categorical Exclusion Determination Minnesota City St. Paul CX(s) Applied: A9, A11, B5.1 Date: 11/02/2009 Location(s): St. Paul, Minnesota Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 2, 2009 CX-000035: Categorical Exclusion Determination Washington's Energy Efficiency Retrofits CX(s) Applied: B5.1 Date: 11/02/2009 Location(s): Washington, Utah Office(s): Energy Efficiency and Renewable Energy November 2, 2009 CX-000034: Categorical Exclusion Determination Saint Regis Mohawk Tribe Energy Efficiency Retrofits CX(s) Applied: B5.1, B2.5 Date: 11/02/2009 Location(s): New York Office(s): Energy Efficiency and Renewable Energy November 2, 2009 CX-000033: Categorical Exclusion Determination Saint Regis Mohawk Tribe Energy Efficiency and Conservation Programs for

394

DOE Cites CH2M-Washington Group Idaho for Price-Anderson Violations |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

M-Washington Group Idaho for Price-Anderson Violations M-Washington Group Idaho for Price-Anderson Violations DOE Cites CH2M-Washington Group Idaho for Price-Anderson Violations June 14, 2007 - 1:40pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today notified CH2M-Washington Group Idaho (CWI) that it will fine the company $55,000 for violations of the Department's nuclear safety requirements. CWI is the prime contractor responsible for managing the Idaho Cleanup Project at the Idaho National Laboratory site. The Preliminary Notice of Violation (PNOV) cites violations associated with radiation safety and quality improvement deficiencies identified during a DOE Idaho Operations Office May 2006 assessment of radioactive waste processing activities at the Accelerated Retrieval Project (ARP). The

395

Evaluation of Behavioral Guidance Structure on Juvenile Salmonid Passage and Survival at Bonneville Dam in 2009  

DOE Green Energy (OSTI)

Pacific Northwest National Laboratory (PNNL) conducted an acoustic-telemetry study at Bonneville Dam in 2009 to evaluate the effects of a behavioral guidance structure (BGS) in the Bonneville Dam second powerhouse forebay on fish passage and survival through the second powerhouse (B2), the dam as a whole, and through the first powerhouse and spillway combined. The BGS was deployed to increase the survival of fish passing through B2 by increasing the percentage of outmigrating smolts entering the B2 Corner Collector (B2CC)a surface flow outlet known to be a relatively benign route for downstream passage at this dam. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. Study results indicated that having turbine 11 in service is important for providing flow conditions that are comparable to those observed in pre-BGS years (2004 and 2005) and in 2008. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; Kim, Jin A.; Fu, Tao; Fischer, Eric S.; Monter, Tyrell J.; Skalski, J. R.

2011-03-01T23:59:59.000Z

396

CX-009196: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Proposed Sale of Bonneville Power Administration (BPA) Fee Owned Property to Washington State Department of Transportation (WSDOT) for Interstate On and Off Ramps CX(s) Applied: B1.24 Date: 10/01/2012 Location(s): Washington Offices(s): Bonneville Power Administration

397

Better Buildings Neighborhood Program: Washington - SEP  

NLE Websites -- All DOE Office Websites (Extended Search)

Better Buildings Partners Better Buildings Partners Printable Version Share this resource Send a link to Better Buildings Neighborhood Program: Washington - SEP to someone by E-mail Share Better Buildings Neighborhood Program: Washington - SEP on Facebook Tweet about Better Buildings Neighborhood Program: Washington - SEP on Twitter Bookmark Better Buildings Neighborhood Program: Washington - SEP on Google Bookmark Better Buildings Neighborhood Program: Washington - SEP on Delicious Rank Better Buildings Neighborhood Program: Washington - SEP on Digg Find More places to share Better Buildings Neighborhood Program: Washington - SEP on AddThis.com... Better Buildings Residential Network Progress Stories Interviews Videos Events Quick Links to Partner Information AL | AZ | CA | CO | CT FL | GA | IL | IN | LA

398

Better Buildings Neighborhood Program: Bainbridge Island, Washington  

NLE Websites -- All DOE Office Websites (Extended Search)

Bainbridge Bainbridge Island, Washington to someone by E-mail Share Better Buildings Neighborhood Program: Bainbridge Island, Washington on Facebook Tweet about Better Buildings Neighborhood Program: Bainbridge Island, Washington on Twitter Bookmark Better Buildings Neighborhood Program: Bainbridge Island, Washington on Google Bookmark Better Buildings Neighborhood Program: Bainbridge Island, Washington on Delicious Rank Better Buildings Neighborhood Program: Bainbridge Island, Washington on Digg Find More places to share Better Buildings Neighborhood Program: Bainbridge Island, Washington on AddThis.com... Better Buildings Residential Network Progress Stories Interviews Videos Events Quick Links to Partner Information AL | AZ | CA | CO | CT FL | GA | IL | IN | LA ME | MD | MA | MI | MO

399

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 30, 2013 September 30, 2013 A screenshot of Hanford's online groundwater monitoring annual report. Groundwater Report Goes Online, Interactive RICHLAND, Wash. - EM's Richland Operations Office (RL) has moved its 1,200-page annual report on groundwater monitoring to a fully online and interactive web application. September 24, 2013 Carbon fiber material produced at SGL Automotive Carbon Fibers in Moses Lake, Wash. (Photo courtesy of SGL Automotive Carbon Fibers) Electric Car Featuring High-Tech Material Made in the USA Makes Its Debut One of the world's first electric vehicles built using ultra lightweight carbon fiber material manufactured in the U.S. was recently unveiled. September 5, 2013 Fun fact: Most systems require air conditioning or chilled water to cool super powerful supercomputers, but the Olympus supercomputer at Pacific Northwest National Laboratory is cooled by the location's 65 degree groundwater. Traditional cooling systems could cost up to $61,000 in electricity each year, but this more efficient setup uses 70 percent less energy. PNNL's scientists use the Olympus supercomputer to conduct advanced research in areas such as energy storage and future power grid development. This supercomputer has the ability to compute as fast as about 20,000 typical personal computers combined. | Photo courtesy of PNNL.

400

Headquarters Program & Staff Office Mailing Addresses | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Headquarters Program & Staff Office Mailing Headquarters Program & Staff Office Mailing Addresses Headquarters Program & Staff Office Mailing Addresses The following addresses are for delivery of regular mail and small packages: Delivery to the Headquarters buildings in Washington, DC: Name of Individual Title Routing Symbol/Forrestal Building U.S. Department of Energy 1000 Independence Ave., S.W. Washington, DC 20585 Name of Individual Title Routing Symbol/L'Enfant Plaza Building U.S. Department of Energy 1000 Independence Ave., S.W. Washington, DC 20585-1615 Delivery to the Headquarters buildings in Germantown, MD: Name of Individual Title Routing Symbol/Germantown Building U.S. Department of Energy 1000 Independence Ave., S.W. Washington, DC 20585-1290 Name of Individual Title Routing Symbol/Cloverleaf Building

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

SunShot Initiative: Visiting the SunShot Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Visiting the SunShot Office Visiting the SunShot Office Photo of the exterior front of 950 L'Enfant Plaza. The entryway is lined with a row of trees and lamp posts. In the foreground is an open space that is bricked and cemented. The DOE Solar Office is located at 950 L'Enfant Plaza in Washington, D.C. Located near the U.S. Department of Energy headquarters, the SunShot Initiative office is on the sixth floor of 950 L'Enfant Plaza, Washington, D.C. Map Washington, D.C. area map with the Solar Office pinpointed Washington D.C. Area Map Official Washington, D.C. Tourism Site - Virtual Tour of Washington, D.C. Metro Directions The Metro rail and bus system is the environmentally-friendly and economical way to get to L'Enfant Plaza. The L'Enfant Plaza station is conveniently located on the blue, orange, yellow, and green lines.

402

Geothermal : Economic Impacts of Geothermal Development in Whatcom County, Washington.  

DOE Green Energy (OSTI)

This report estimates the local economic impacts that could be anticipated from the development of a 100 megawatt (MW) geothermal power plant in eastern Whatcom County, Washington, near Mt. Baker, as shown in Figure 1. The study was commissioned by the Bonneville Power Administration to quantify such impacts as part of regional confirmation work recommended by the Northwest Power Planning Council. Whatcom County was chosen due to both identified geotherrnal resources and developer interest. The analysis will focus on two phases: a plant construction phase, including well field development, generating plant construction, and transmission line construction; and an operations phase. Economic impacts will occur to the extent that construction and operations affect the local economy. These impacts will depend on the existing structure of the Whatcom County economy and estimates of revenues that may accrue to the county as a result of plant construction, operation, and maintenance. Specific impacts may include additional direct employment at the plant, secondary impacts from wage payments being used to purchase locally produced goods and services, and impacts due to expenditures of royalty and tax payments received by the county. The basis for the analysis of economic impacts in this study is the US Forest Service IMPLAN input-output modeling system.

Lesser, Jonathan A.

1992-07-01T23:59:59.000Z

403

Geothermal : Economic Impacts of Geothermal Development in Skamania County, Washington.  

DOE Green Energy (OSTI)

This report estimates the local economic impacts that could be anticipated from the development of a 100 megawatt (MW) geothermal power plant in eastern Skamania County, Washington, near Mt. Adams, as shown in Figure 1. The study was commissioned by the Bonneville Power Administration to quantify such impacts as part of regional confirmation work recommended by the Northwest Power Planning Council. Skamania County was chosen due to both identified geothermal resources and developer interest. The analysis will focus on two phases: a plant construction phase, including well field development, generating plant construction, and transmission line construction; and an operations phase. Economic impacts will occur to the extent that construction and operations affect the local economy. These impacts will depend on the existing structure of the Skamania County economy and estimates of revenues that may accrue to the county as a result of plant construction, operation, and maintenance. Specific impacts may include additional direct employment at the plant, secondary impacts from wage payments being used to purchase locally produced goods and services, and impacts due to expenditures of royalty and tax payments received by the county. The basis for the analysis of economic impacts in this study is the US Forest Service IMPLAN input-output modeling system.

Lesser, Jonathan A.

1992-07-01T23:59:59.000Z

404

Velocity Measurements at Six Fish Screening Facilities in the Yakima River Basin, Washington, Summer 1988 : Annual Report.  

DOE Green Energy (OSTI)

The Bonneville Power Administration (BPA), the United States Bureau of Reclamation (USSR), and the Washington State Department of Ecology (WDOE) are funding the construction and evaluation of fish passage facilities and fish protection facilities at irrigation and hydroelectric diversions in the Yakima River Basin, Washington State. The program provides offsite enhancement to compensate for fish and wildlife losses caused by hydroelectric development throughout the Columbia River Basin, and addresses natural propagation of salmon to help mitigate the impact of irrigation in the Yakima River Basin. This report evaluates the flow characteristics of the screening facilities. Studies consisted of velocity measurements taken in front of the rotary drum screens and within the fish bypass systems during peak flows. Measurements of approach velocity and sweep velocity were emphasized in these studies; however, vertical velocity was also measured. 5 refs., 18 figs., 15 tabs.

Abernethy, C. Scott; Neitzel, Duane A.; Lusty, E. William

1989-11-01T23:59:59.000Z

405

Evaluation of the Fish Passage Effectiveness of the Bonneville I Prototype Surface Collector using Three-Dimensional Ultrasonic Fish Tracking  

Science Conference Proceedings (OSTI)

This report describes tests conducted at Bonneville Dam on the Columbia River in the spring of 2000 using three-dimensional acoustic telemetry and computational fluid dynamics hydraulic modeling to observe the response of outmigrating juvenile steelhead and yearling chinook to a prototype surface collector installed at the Powerhouse. The study described in this report was one of several conducted for the U.S. Army Corps of Engineers to prepare a decision document on which of two bypass methods: surface flow bypass or extended-length submersible bar screens to use to help smolts pass around Bonneville dams without going through the turbines.

Faber, Derrek M.; Weiland, Mark A.; Moursund, Robert; Carlson, Thomas J.; Adams, Noah; Rhondorf, D.

2001-05-01T23:59:59.000Z

406

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement - Appendices Statement - Appendices DOE/EIS-0285 Arrow-leaf Balsamroot Cooperating Agencies Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement DOE/EIS-0285 APPENDICES May 2000 Table of Contents Appendix A - Public Involvement: Publications Appendix B - Biological Weed Control Agents Appendix C - Bonneville Pesticide Applicator Certification Plan Appendix D - Sample Educational Information Appendix E - Clearance Criteria Appendix F - FS Mitigation Measures and Background Appendix G - BLM Mitigation Measures and Background Appendix H - Herbicide Fact Sheets 2,4-D Azafenidin Bromacil Chlorsulfuron Clopyralid Dicamba Dichlobenil Diuron Fosamine Ammonium Glyphosate Halosulfuron-methyl Hexazinone Imazapyr Isoxaben Mefluidide Metsulfuron-methyl

407

Monitoring and Evaluation of the Prototype Surface Collector at Bonneville First Powerhouse in 2000: Synthesis of Results  

DOE Green Energy (OSTI)

This report describes research done to evaluate the Prototype Surface Collector at Bonneville Dam, Powerhouse I, on the Columbia River. The surface collector is being evaluated as a means for bringing downstream migrating salmon and steelhead through the powerhouse while avoiding the turbines. The report describes evaluations conducted by PNNL, National Marine Fisheries Service, and various contractors using radio telemetry, hydroacoustics, and computational fluid dynamics models. The evaluation will provide information to the U.S. Army Corps of Engineers for their 2001 decision on whether to use surface flow bypass or extended-length submersible bar screens for long-term smolt passage at Bonneville Dam.

Carlson, Thomas J

2001-06-01T23:59:59.000Z

408

The U.S. Department of Energy Office of Indian Energy Policy and Programs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington, D.C., Roundtable Summary Washington, D.C., Roundtable Summary March 30, 2011 Prepared by: The Udall Foundation's U.S. Institute for Environmental Conflict Resolution DOE Tribal Roundtable on Tribal Energy Washington, DC Mach 30, 2011 WASHINGTON, D.C. EXECUTIVE SUMMARY The Washington, D.C. Roundtable on Tribal Energy Policy and Priorities convened at 1:30 PM on March 30, 2011 at the Dirksen Senate Building. The meeting was hosted by the Department of Energy (DOE) Office of Indian Energy Policy and Programs (Office of Indian Energy). Tracey LeBeau, Director of the Office of Indian Energy, and Pilar Thomas, Deputy Director-Policy, Office of Indian Energy, represented DOE. Twenty-six participants from six different tribes, various

409

CONTACT LIST Records Management Field Officers (RMFOs) PRGM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PRGM PRGM NAME PRGM OFC EMPLOY LOCATION PHONE EMAIL Ames Lab Tehan, Amy Ames Laboratory Federal Ames, IA 630-252-3721 ajotehan@ameslab.gov ANL Martin, Mary L. Argonne National Laboratory Contractor Germantown, MD 630-252-3721 mmartin@anl.gov BHSO Nekulak, Kim Brookhaven Site Office Federal Upton, NY 631-344-7439 knekulak@bnl.gov BNL Flood, Patricia E. Brookhaven National Laboratory Contractor Upton, NY 631-344-7886 flood@bnl.gov BPA Frost, Christopher Bonneville Power Administration Federal Portland, OR 503-230-5602 cmfrost@bpa.gov CB Chism, Lea Carlsbad Field Office Federal Carlsbad, NM 575-234-7442 lea.chism@wipp.ws CH Lane, Georgette M. Chicago Operations Office Federal Argonne, IL 630-252-8906 georgette.lane@ch.doe.gov EMCBC Reid, Kathy Portsmouth Paducah Project Office (PPPO, EM Small Sites: GE Vallecitos, Inhalation Toxicology Lab,

410

Office Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

Since they comprised 18 percent of commercial floorspace, this means that their total energy intensity was just slightly above average. Office buildings predominantly used...

411

Budget Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Calculator, spreadhseet, pen Budget Office Financial Management and Reporting: Project budget planning and analysis (post-award) Forecasting and long range planning Financial...

412

Washington Biodiesel | Open Energy Information  

Open Energy Info (EERE)

Logo: Washington Biodiesel Name Washington Biodiesel Address 3401 Fremont Avenue N. Place Seattle, Washington Zip 98103 Sector Biofuels Product Aims to grow biodiesel feedstock Website http://wabiodiesel.com/ Coordinates 47.6495905°, -122.3497956° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.6495905,"lon":-122.3497956,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

413

Pacific Northwest Site Office Homepage | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Home Home Pacific Northwest Site Office (PNSO) PNSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Pacific Northwest Site Office U.S. Department of Energy P.O. Box 350, MS K9-42 Richland, WA 99352 P: (509) 372-4005 Pacific Northwest Site Office Pictured Right: Pacific Northwest Site Office Staff PNSO Staff Photo 1 of 2 Print Text Size: A A A RSS Feeds FeedbackShare Page The Pacific Northwest Site Office (PNSO) is an organization within the U.S. Department of Energy's Office of Science with responsibility to oversee and manage the Management and Operating (M&O) contract for the Pacific Northwest National Laboratory (PNNL) External link in Richland, Washington. PNNL is one of ten Office of Science Laboratories and is a multi-program

414

Annual Coded Wire Tag Program; Washington Missing Production Groups, 1994 Annual Report.  

DOE Green Energy (OSTI)

The Bonneville Power Administration (BPA) funds the ``Annual Coded Wire Tag Program -- Missing Production Groups for Columbia River Hatcheries`` project. The Washington Department of Fish and Wildlife (WDFW) [formerly the Washington Department of Fisheries (WDF) and the Washington Department of Wildlife (WDW)], Oregon Department of Fish and Wildlife (ODFW) and the United States Fish and Wildlife Service (USFWS) all operate salmon and steelhead rearing programs in the Columbia River basin. The intent of the funding is to coded-wire tag at least one production group of each species at each Columbia Basin hatchery to provide a holistic assessment of survival and catch distribution over time. Data generated by this project contributes to WDFW`s obligations for representative tagging under the Endangered. Species Act (ESA) permit for operating Columbia Basin facilities. WDFW facilities operating outside the Snake River basin are required to have a Section 10, ``Incidental Take`` permit. Consistent with special conditions within this permit, WDFW has now reached it`s objective to tag representative groups from all WDFW Columbia Basin releases.

Fuss, Howard J.; Ashbrook, Charmane; Doty, Daniel (Washington Department of Fish and Wildlife, Olympia, WA)

1994-12-01T23:59:59.000Z

415

BPA/Puget Power Northwest Washington Transmission Project : Summary of the Supplemental Draft Environmental Statement.  

SciTech Connect

BPA and Puget Sound Power and Light (Puget Power) are proposing to upgrade the existing electric transmission power system in the Whatcom and Skagit County area of northwest Washington to increase the capacity of the US-Canada Intertie transmission system. The project would satisfy the need to provide more ability to store and return energy with Canada, would provide additional capacity on the Intertie for anticipated increases in power transactions, and would increase flexibility in operation of the US and Canadian hydroelectric system. It would protect Puget Power`s local system against thermal overloads, and improve local reliability. In November 1993, Bonneville Power Administration (BPA), and Whatcom County (Washington) published a draft environmental impact statement (DEIS) for the proposed Northwest Washington Transmission Project. In order to present some shifts in need for the project and to permit additional review, BPA and Whatcom County have elected to issue a Supplemental Draft EIS. This Summary presents background material, explains project needs and purposes, and then focuses on alternatives and the possible effects.

United States. Bonneville Power Administration.

1995-04-01T23:59:59.000Z

416

Synthesis of Biological Reports on Juvenile Fish Passage and Survival at Bonneville Dam through 2005  

DOE Green Energy (OSTI)

This report describes a review of available literature on juvenile salmonid passage at Bonneville Dam from 1939 through 2005. Studies of interest included project-wide fish-passage efficiency (FPE) studies by radio telemetry and fixed-aspect hydroacoustics, fish survival studies (direct and indirect), FGE studies, powerhouse and unit (by netting, hydroacoustics, and radio telemetry), predation studies in the forebay and tailrace, behavioral studies on forebay approach and egress, and surface-bypass studies. The FPE effort will include a review of available distribution data (horizontal, diel, and vertical) for juvenile salmon. This study does not repeat the results of previous review and synthesis studies but cites them. Where no previous review exists for a subject area, all reports were reviewed and synthesized. The report includes an annotated bibliography summarizing each of the documents reviewed and a DVD disk containing all of the original papers and reports along with an HTML index to the documents.

Ploskey, Gene R.; Johnson, Gary E.; Giorgi, Albert E.; Johnson, Richard L.; Stevenson, John R.; Schilt, Carl R.; Johnson, Peter N.; Patterson, Deborah S.

2005-06-01T23:59:59.000Z

417

Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing Through Bonneville Dam, 2010  

Science Conference Proceedings (OSTI)

Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, T. D.; Monter, Tyrell J.; Skalski, J. R.; Townsend, Richard L.; Zimmerman, Shon A.

2012-09-01T23:59:59.000Z

418

Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration  

Science Conference Proceedings (OSTI)

This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

1992-05-28T23:59:59.000Z

419

Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2010  

DOE Green Energy (OSTI)

Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, Tyler; Monter, Tyrell J.; Skalski, John R.; Townsend, Richard L.; Zimmerman, Shon A.

2011-12-01T23:59:59.000Z

420

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2009 6, 2009 CX-000044: Categorical Exclusion Determination Spokane Tribe of the Spokane Reservation Renewable Energy Technologies (Solar) on Government Buildings CX(s) Applied: B3.6, B5.1 Date: 11/06/2009 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy November 6, 2009 CX-000043: Categorical Exclusion Determination Spokane Tribe of the Spokane Reservation Energy Efficiency Retrofits CX(s) Applied: B2.5, B5.1, B6.3 Date: 11/06/2009 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy November 6, 2009 CX-000041: Categorical Exclusion Determination Pima-Maricopa Indian Community of the Salt River Reservation Financial Incentive Programs CX(s) Applied: B5.1, A1 Date: 11/06/2009 Location(s): Arizona Office(s): Energy Efficiency and Renewable Energy

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Categorical Exclusion Determinations: Office of Electricity Delivery and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 20, 2010 August 20, 2010 CX-003473: Categorical Exclusion Determination Pacific Northwest Smart Grid Demonstration CX(s) Applied: A1, A9, A11, B1.7, B4.4, B4.7, B4.11, B5.1 Date: 08/20/2010 Location(s): Pullman, Washington Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory August 17, 2010 CX-003429: Categorical Exclusion Determination Oswego County BOCES Wind Turbine Model Project CX(s) Applied: A9, B1.15, B5.1 Date: 08/17/2010 Location(s): Mexico, New York Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory August 5, 2010 CX-003312: Categorical Exclusion Determination Power Grid Reliability and Security ? Phase II CX(s) Applied: A9, A11 Date: 08/05/2010 Location(s): Pullman, Washington Office(s): Electricity Delivery and Energy Reliability, National Energy

422

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

24, 2011 24, 2011 CX-005322: Categorical Exclusion Determination Subtask 2.1 Maui Site: National Marine Renewable Energy Center in Hawaii CX(s) Applied: A9, B3.1 Date: 02/24/2011 Location(s): Maui, Hawaii Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 16, 2011 CX-005219: Categorical Exclusion Determination Van Dyk Dairy Anaerobic Digester CX(s) Applied: A9, B3.8, B5.1 Date: 02/16/2011 Location(s): Lynden, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 16, 2011 CX-005217: Categorical Exclusion Determination State Energy Program American Reinvestment and Recovery Act Sirti -Demand Energy -Energy Storage System Tied to Solar on Commercial Facility CX(s) Applied: A9, B1.7, B5.1 Date: 02/16/2011 Location(s): Liberty Lake, Washington

423

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2011 8, 2011 CX-006463: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 08/08/2011 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 8, 2011 CX-006460: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 08/08/2011 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 8, 2011 CX-006458: Categorical Exclusion Determination Installation of Retail Biofuel Infrastructure Supporting I-75 Green Corridor Project CX(s) Applied: A1, B5.1 Date: 08/08/2011 Location(s): Detroit, Michigan Office(s): Energy Efficiency and Renewable Energy, National Energy

424

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2011 3, 2011 CX-005811: Categorical Exclusion Determination Chicago Area Alternative Fuels Deployment Project CX(s) Applied: B5.1 Date: 05/13/2011 Location(s): Chicago, Illinois Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory May 13, 2011 CX-005809: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 05/13/2011 Location(s): Mercer Island, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory May 13, 2011 CX-005808: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 05/13/2011 Location(s): Mercer Island, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy

425

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2011 5, 2011 CX-006240: Categorical Exclusion Determination Acoustic Effects of Hydrokinetic Tidal Turbines CX(s) Applied: B3.1, B3.3 Date: 07/15/2011 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 15, 2011 CX-006238: Categorical Exclusion Determination Development of Post-Installation Monitoring Capabilities CX(s) Applied: A9, B3.1, B3.3 Date: 07/15/2011 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 15, 2011 CX-006228: Categorical Exclusion Determination State Energy Program American Recovery and Reinvestment Act - Deployment of Innovative Energy Efficiency and Renewable Energy - Agriculture - Dufur and Hanna-Cantrell CX(s) Applied: B5.1 Date: 07/15/2011 Location(s): Dufur, Oregon

426

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2010 6, 2010 CX-004466: Categorical Exclusion Determination Washington State Biofuels Industry Development CX(s) Applied: B3.6 Date: 11/16/2010 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 16, 2010 CX-004459: Categorical Exclusion Determination Wind and Water -Delos-Reyes Morrow Pressure: Simple, Scalable, and Submerged CX(s) Applied: A9 Date: 11/16/2010 Location(s): Oregon Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 16, 2010 CX-004458: Categorical Exclusion Determination Cincinnati City American Recovery and Reinvestment Act - Energy Efficiency and Conservation Block Grant Act 3 (Mill Creek Restoration Project - Phase 3) CX(s) Applied: A9, A11, B5.1 Date: 11/16/2010 Location(s): Cincinnati, Ohio

427

Vehicle Technologies Office: Vehicle Technologies Office Recognizes  

NLE Websites -- All DOE Office Websites (Extended Search)

Vehicle Technologies Vehicle Technologies Office Recognizes Outstanding Researchers to someone by E-mail Share Vehicle Technologies Office: Vehicle Technologies Office Recognizes Outstanding Researchers on Facebook Tweet about Vehicle Technologies Office: Vehicle Technologies Office Recognizes Outstanding Researchers on Twitter Bookmark Vehicle Technologies Office: Vehicle Technologies Office Recognizes Outstanding Researchers on Google Bookmark Vehicle Technologies Office: Vehicle Technologies Office Recognizes Outstanding Researchers on Delicious Rank Vehicle Technologies Office: Vehicle Technologies Office Recognizes Outstanding Researchers on Digg Find More places to share Vehicle Technologies Office: Vehicle Technologies Office Recognizes Outstanding Researchers on AddThis.com...

428

Hydroacoustic Evaluation of Fish-Passage Efficiency at Bonneville Dam in 2001  

DOE Green Energy (OSTI)

The Portland District of the U.S. Army Corps of Engineers requested that scientists with the Pacific Northwest National Laboratory (PNNL) and the U.S. Army Engineer Research and Development Center (ERDC) conduct the hydroacoustic fish-passage studies described in this report. The ERDC also contracted with MEVATEC Corporation and Dyntel to provide staff ranging from scientists to technicians for the study. This study supports the Portland-District goal of maximizing fish passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing the Bonneville Project. This report presents results of two hydroacoustic studies of juvenile salmonids. One was a Project-wide study of fish-passage efficiency, and the other was more narrowly focused upon the approach, vertical distribution, and fish-guidance efficiency (FGE) of fish at Unit 15, where the Portland District extensively modified the gatewell and vertical barrier screen to improve gatewell flow and FGE. The goal of the larger of the two studies was to provide project-wide estimates of FPE, spill efficiency, and spill effectiveness for run-of-river fish passing the Bonneville Project during the 2001 out-migration. This type of study also provides estimates of the horizontal, vertical, and diel distributions of fish passage and FGE by turbine unit. These data will provide a baseline for evaluating the performance of future management efforts to improve juvenile fish passage. The goal of the second study was to assess the effect of gatewell and vertical-barrier-screen modifications on the FGE of Unit 15.

Ploskey, Gene R.; Schilt, Carl R.; Hanks, Michael E.; Johnson, Peter N.; Kim, Jina; Skalski, John R.; Patterson, Deborah S.; Nagy, William T.; Lawrence, Larry R.

2002-10-11T23:59:59.000Z

429

Evaluation of Salmon Spawning Below Bonneville Dam Annual Report October 2006 - September 2007.  

DOE Green Energy (OSTI)

From 1999 through 2007, the Fish and Wildlife Program of the Bonneville Power Administration funded a project to determine the number of fall Chinook and chum salmon spawning downstream of Bonneville Dam, the characteristics of their spawning areas, and the flows necessary to ensure their long-term survival. Data were collected to ensure that established flow guidelines are appropriate and provide adequate protection for the species of concern. The projects objectives are consistent with the high priority placed by the Northwest Power and Conservation Council Independent Scientific Advisory Board and the salmon managers on determining the importance of mainstem habitats to the production of salmon in the Columbia River Basin. Because of the influence of mainstem habitat on salmon production, there is a continued need to better understand the physical habitat variables used by mainstem fall Chinook and chum salmon populations and the effects of hydropower project operations on spawning and incubation. During FY 2007, Pacific Northwest National Laboratory focused on (1) locating and mapping deep-water fall Chinook salmon and chum salmon spawning areas, (2) investigating the interaction between groundwater and surface water near fall Chinook and chum salmon spawning areas, and (3) providing in-season hyporheic temperature and water surface elevation data to assist state agencies with emergence timing and redd dewatering estimates. This report documents the studies and tasks performed by PNNL during FY 2007. Chapter 1 provides a description of the searches conducted for deepwater redds-adjacent to Pierce and Ives islands for fall Chinook salmon and near the Interstate 205 bridge for chum salmon. The chapter also provides data on redd location, information about habitat associations, and estimates of total spawning populations. Chapter 2 documents the collection of data on riverbed and river temperatures and water surface elevations, from the onset of spawning to the end of emergence, and the provision of those data in-season to fisheries management agencies to assist with emergence timing estimates and evaluations of redd dewatering.

Arntzen, Evan V.; Mueller, Robert P.; Murray, Katherine J.; Bott, Yi-Ju [Pacific Northwest National Laboratory

2008-08-08T23:59:59.000Z

430

Total Dissolved Gas Effects on Incubating Chum Salmon Below Bonneville Dam  

DOE Green Energy (OSTI)

At the request of the U.S. Army Corps of Engineers (USACE; Portland District), Pacific Northwest National Laboratory (PNNL) undertook a project in 2006 to look further into issues of total dissolved gas (TDG) supersaturation in the lower Columbia River downstream of Bonneville Dam. In FY 2008, the third year of the project, PNNL conducted field monitoring and laboratory toxicity testing to both verify results from 2007 and answer some additional questions about how salmonid sac fry respond to elevated TDG in the field and the laboratory. For FY 2008, three objectives were 1) to repeat the 2006-2007 field effort to collect empirical data on TDG from the Ives Island and Multnomah Falls study sites; 2) to repeat the static laboratory toxicity tests on hatchery chum salmon fry to verify 2007 results and to expose wild chum salmon fry to incremental increases in TDG, above those of the static test, until external symptoms of gas bubble disease were clearly present; and 3) to assess physiological responses to TDG levels in wild chum salmon sac fry incubating below Bonneville Dam during spill operations. This report summarizes the tasks conducted and results obtained in pursuit of the three objectives. Chapter 1 discusses the field monitoring, Chapter 2 reports the findings of the laboratory toxicity tests, and Chapter 3 describes the field-sampling task. Each chapter contains an objective-specific introduction, description of the study site and methods, results of research, and discussion of findings. Literature cited throughout this report is listed in Chapter 4. Additional details on the monitoring methodology and results are provided in Appendices A and B included on the compact disc bound inside the back cover of the printed version of this report.

Arntzen, Evan V.; Hand, Kristine D.; Carter, Kathleen M.; Geist, David R.; Murray, Katherine J.; Dawley, Earl M.; Cullinan, Valerie I.; Elston, Ralph A.; Vavrinec, John

2009-01-29T23:59:59.000Z

431

Why sequence Bacteria from Lake Washington?  

NLE Websites -- All DOE Office Websites (Extended Search)

bacteria from Lake Washington? bacteria from Lake Washington? Previous collaborations between the University of Washington team and the DOE JGI involving both single genome and metagenomic sequencing have greatly enhanced the community's ability to explore the diversity of bacteria functionally active in metabolism of single carbon compounds, known as methylotrophs, isolated from Lake Washington (Seattle, Washington) sediment. Sequencing genomes of 50 methylotroph isolates from the Lake Washington will further enhance the methylotroph community knowledge database providing a much higher level of resolution of global (meta)transcriptomic and (meta)proteomic analyses, as well as species interaction studies, informing a better understanding of biogeochemical cycling of carbon and nitrogen.

432

Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.  

SciTech Connect

In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

United States. Bonneville Power Administration.

1994-01-01T23:59:59.000Z

433

Geothermal : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.  

DOE Green Energy (OSTI)

The actual geothermal exploration and development may appear to be a simple and straightforward process in comparison to the legal and institutional maze which the developer must navigate in order to obtain all of the federal, state, and local leases, permits, licenses, and approvals necessary at each step in the process. Finally, and often most difficult, is obtaining a contract for the sale of thermal energy, brine, steam, or electricity. This guide is designed to help developers interested in developing geothermal resource sites in the Bonneville Power Administration Service Territory in the state of Idaho, Montana, Oregon, and Washington better understand the federal, state, and local institutional process, the roles and responsibilities of each agency, and how and when to make contact in order to obtain the necessary documents.

Bloomquist, R.Gordon

1991-10-01T23:59:59.000Z

434

News From the D.C. Office: E x p a n s i o n  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Aerial view of Washington D.C. 3 Aerial view of Washington D.C. News From the D.C. Office E x p a n s i o n With a growing amount of project support work and increasing contacts with our Washington-based clients, the Environmental Energy Technologies Division (EETD) Washington Project Office is preparing for an expansion this spring. Two years after the office opened, we are making plans to more than double our present space and add a second meeting room, as well as additional demonstrations of efficient lighting, daylighting, and office technologies. The expanded space will be located either on a different floor of our current building at 1250 Maryland Ave. SW or in another building equally close to DOE headquarters. The Project office was established in Spring 1993 to enhance the Division's

435

Albuquerque Operations Office  

Office of Legacy Management (LM)

%r © J~4 %r © J~4 aDepartment of Energy Albuquerque Operations Office P.O. Box 5400 Albuquerue. New Mexico 87118 JUIl 0 198 Vicinity Property No. CA-401 _ U l Address; Mayer Street Bridgeville, Pennsylvania Cyclops Corporation 650 Washington Road Pittsburgh, Pennsylvania 15228 Dear Sir: Under the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, the Department of Energy (DOE) is authorized to conduct remedial action at properties contaminated with residual radioactive material from inactive uranium mill sites. Evaluation of your property identified above has revealed the presence of residual radioactive material in excess of standards established by the Environmental Protection Agency (EPA). Therefore, your property has been formally included by DOE for remedial action in the Uranium Mill Tailings

436

EIS-0471: Department of Energy Loan Guarantee to Support Proposed Eagle Rock Enrichment Facility in Bonneville County, Idaho  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the environmental impacts of construction, operation, and decommissioning of the proposed Eagle Rock Enrichment Facility (EREF), a gas centrifuge uranium enrichment facility to be located in a rural area in western Bonneville County, Idaho. (DOE adopted this EIS issued by NRC on 04/13/2007.)

437

Fort Lewis, Yakima Firing Center, and Vancouver Barracks/Camp Bonneville basewide energy use plan; executive summary. Final report  

SciTech Connect

This Executive Summary presents an overview of a series of studies, mostly energy related, of Fort Lewis, Yakima Firing Center, Vancouver Barracks, and Camp Bonneville. Collectively, the work is known as the Basewide Energy Use Plan and is a part of the Energy Conservation Investment Program (ECIP).

Smiley, D.P.

1984-03-01T23:59:59.000Z

438

Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011  

Science Conference Proceedings (OSTI)

The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

2012-03-01T23:59:59.000Z

439

Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011  

Science Conference Proceedings (OSTI)

The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

2012-06-07T23:59:59.000Z

440

(DOE/EIS-0285/SA-63): Supplement Analysis for the Transmission System Vegetation Management Program FEIS, North Bonneville-Midway and Hanford-Ostrander 4/22/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2002 2, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS, North Bonneville-Midway and Hanvor-Ostrander (DOE/EIS-0285/SA-63) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on the North Bonneville-Midway and Hanford- Ostrander transmission line right-of-way (approx. 702 acres). The project area begins at the North Bonneville Substation and terminates at structure 25/3+500. For most of the length of the right-of-way, the width is 300 feet wide on the North Bonneville-Midway Line and 150 feet wide for the Hanford- Ostrander Line. Location: The ROW is located in North Bonneville, Skamania County, OR, being in the

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2010 5, 2010 CX-000919: Categorical Exclusion Determination Packwood Lake Hydroelectric Project CX(s) Applied: B5.1 Date: 02/25/2010 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 25, 2010 CX-000917: Categorical Exclusion Determination Ocean Thermal Energy Converter Life Cycle Cost Analysis Date: 02/25/2010 Location(s): Virginia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 25, 2010 CX-000916: Categorical Exclusion Determination Ocean Thermal Extractable Energy Visualization CX(s) Applied: A9 Date: 02/25/2010 Location(s): Virginia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 25, 2010 CX-000862: Categorical Exclusion Determination Mount Laurel Energy Audit Implementation Project

442

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2009 0, 2009 CX-000251: Categorical Exclusion Determination California City Riverside CX(s) Applied: A9, A11, B5.1 Date: 12/20/2009 Location(s): Riverside, California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office December 18, 2009 CX-000250: Categorical Exclusion Determination WA County Kitsap CX(s) Applied: A9, A11, B5.1 Date: 12/18/2009 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office December 17, 2009 CX-000565: Categorical Exclusion Determination Recovery Act: Wind Blade Manufacturing Innovation CX(s) Applied: A9, B3.6 Date: 12/17/2009 Location(s): North Carolina Office(s): Energy Efficiency and Renewable Energy, Golden Field Office December 17, 2009 CX-002152: Categorical Exclusion Determination

443

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2010 6, 2010 CX-002574: Categorical Exclusion Determination Expansion of Manufacturing Capabilities to Create Photovoltaic Frames for Panels CX(s) Applied: B5.1 Date: 05/26/2010 Location(s): Germantown, Wisconsin Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 26, 2010 CX-002557: Categorical Exclusion Determination G.R. Silicate CX(s) Applied: B5.1 Date: 05/26/2010 Location(s): Hoquiam, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 26, 2010 CX-002480: Categorical Exclusion Determination State Energy Program: 21st Century Energy Grants- AAA Cab Service CX(s) Applied: B5.1 Date: 05/26/2010 Location(s): Phoenix, Arizona Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 25, 2010 CX-002417: Categorical Exclusion Determination

444

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2010 7, 2010 CX-002536: Categorical Exclusion Determination American Recovery and Reinvestment Act Green Industry Business Development Program CX(s) Applied: B5.1 Date: 05/27/2010 Location(s): Chicago, Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 27, 2010 CX-002538: Categorical Exclusion Determination Tangent Grant Application for American Recovery and Reinvestment Act Business Development Program CX(s) Applied: B5.1 Date: 05/27/2010 Location(s): Aurora, Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 27, 2010 CX-002561: Categorical Exclusion Determination CAMPS (Center for Advanced Manufacturing Puget Sound) CX(s) Applied: A9, A11 Date: 05/27/2010 Location(s): Puget Sound, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

445

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23, 2009 23, 2009 CX-000208: Categorical Exclusion Determination Recovery Act - PEM (Polymer Electrolyte Membrane) Fuel Cell Systems Providing Emergency Reserve and Backup Power CX(s) Applied: B5.1 Date: 11/23/2009 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 23, 2009 CX-000207: Categorical Exclusion Determination NaSi (Sodium Silicide) and Na-SG (Sodium Silica Gell) Powder Hydrogen Fuel Cells CX(s) Applied: B3.6 Date: 11/23/2009 Location(s): New York Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 23, 2009 CX-000206: Categorical Exclusion Determination Michigan Biogas Center of Excellence CX(s) Applied: A9, B3.6 Date: 11/23/2009 Location(s): Flint, Michigan Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

446

BEFORE THE U.S. DEPARTMENT OF ENERGY Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington Washington , D.C. 20585 In the Matter of: The Mackie Company, Inc., ) Case Number: 2010-SE-0106 Respondent ) COMPROMISE AGREEMENT The U.S. Department of Energy Office of the General Counsel initiated this action against The Mackie Company, Inc. ("Respondent") pursuant to 10 C.F.R. § 430.74 by Notice of Proposed Civil Penalty alleging that Respondent had failed to submit a certification report and compliance statement for a variety of refrigerators, refrigerator- freezers, and freezers. Respondent on behalf of itself and any parent, subsidiary, division or other related entity and DOE, by their authorized representatives, hereby enter into this Compromise Agreement for the purpose of settling this civil penalty action. I. DEFINITIONS For the purposes of this Compromise Agreement,:the.following definitions shall apply:

447

Building Technologies Office: Contacts  

NLE Websites -- All DOE Office Websites (Extended Search)

Office: Contacts on Twitter Bookmark Building Technologies Office: Contacts on Google Bookmark Building Technologies Office: Contacts on Delicious Rank Building...

448

Advanced Manufacturing Office: Webcasts  

NLE Websites -- All DOE Office Websites (Extended Search)

Office: Webcasts on Twitter Bookmark Advanced Manufacturing Office: Webcasts on Google Bookmark Advanced Manufacturing Office: Webcasts on Delicious Rank Advanced...

449

Advanced Manufacturing Office: Subscribe  

NLE Websites -- All DOE Office Websites (Extended Search)

Office: Subscribe on Twitter Bookmark Advanced Manufacturing Office: Subscribe on Google Bookmark Advanced Manufacturing Office: Subscribe on Delicious Rank Advanced...

450

Advanced Manufacturing Office: Workshops  

NLE Websites -- All DOE Office Websites (Extended Search)

Office: Workshops on Twitter Bookmark Advanced Manufacturing Office: Workshops on Google Bookmark Advanced Manufacturing Office: Workshops on Delicious Rank Advanced...

451

Building Technologies Office: Webmaster  

NLE Websites -- All DOE Office Websites (Extended Search)

Office: Webmaster on Twitter Bookmark Building Technologies Office: Webmaster on Google Bookmark Building Technologies Office: Webmaster on Delicious Rank Building...

452

Integrated Support Center Chicago Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Revision 5 Southwestern and Bonneville Power Administration's; Naval Petroleum and Oil Shale Reserves; National Energy Technology Laboratory (including Albany Research Center);...

453

DOE Office of Science - Chicago Office  

NLE Websites -- All DOE Office Websites (Extended Search)

NEPA Documents There are no draft NEPA documents currently available for Office of Science-Chicago Office actions or for other actions which the Chicago Office supported....

454

DOE Office of Science - Chicago Office  

NLE Websites -- All DOE Office Websites (Extended Search)

ORGANIZATION CHART Organization Chart Office of Human Resources Services New Brunswick Laboratory Office of Acquisition and Assistance Office of Chief Counsel Click on select...

455

Naval Nuclear Propulsion Program Directorate, Washington ...  

Science Conference Proceedings (OSTI)

Naval Nuclear Propulsion Program Directorate, Washington, DC. NVLAP Lab Code: 100565-10. Address and Contact Information: Naval Reactors ...

2013-07-26T23:59:59.000Z

456

Naval Nuclear Propulsion Program Directorate, Washington ...  

Science Conference Proceedings (OSTI)

Naval Nuclear Propulsion Program Directorate, Washington, DC. NVLAP Lab Code: 100565-0. Address and Contact Information: ...

2013-08-23T23:59:59.000Z

457

Naval Nuclear Propulsion Program Directorate, Washington ...  

Science Conference Proceedings (OSTI)

Naval Nuclear Propulsion Program Directorate, Washington, DC. NVLAP Lab Code: 100565-2. Address and Contact Information: Point Loma, Bldg. ...

2013-08-23T23:59:59.000Z

458

Preliminary Notice of Violation, Washington TRU Solutions, LLC - EA-2004-08  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRU Solutions, LLC - TRU Solutions, LLC - EA-2004-08 Preliminary Notice of Violation, Washington TRU Solutions, LLC - EA-2004-08 August 30, 2004 Preliminary Notice of Violation issued to Washington TRU Solutions, LLC, related to the Transportainer Procurement and Fabrication Deficiencies at the Waste Isolation Pilot Plant Department of Energy's Office of Price-Anderson Enforcement (OE) initiated an investigation of the issues with a full review of relevant documentation. In addition, discussions that involved Department of Energy Carlsbad Field Office (DOE-CBFO) and Washington TRU Solutions, LLC (WTS) personnel took place in Carlsbad on May 11-12, 2004. Our findings were provided to you in an Investigation Summary Report dated June 25, 2004. An Enforcement Conference was held with you and members of your staff on July

459

Preliminary Notice of Violation, CH2M-Washington Group Idaho, LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

M-Washington Group Idaho, LLC - M-Washington Group Idaho, LLC - EA-2007-03 Preliminary Notice of Violation, CH2M-Washington Group Idaho, LLC - EA-2007-03 June 14, 2007 Preliminary Notice of Violation issued to CH2M-Washington Group Idaho, LLC, related to Radiation Protection Program Deficiencies at the Radioactive Waste Management Complex - Accelerated Retrieval Project at the Idaho National Laboratory This letter refers to the investigation of events at the Radioactive Waste Management Complex - Accelerated Retrieval Project (ARP) by the Department of Energy's (DOE) Office of Enforcement. The investigation summary report, Multiple Radiological Protection Program Deficiencies and Safety Culture Concerns, was provided to you in a letter dated February 20, 2007. An enforcement conference to discuss these findings was held on March

460

Preliminary Notice of Violation, CH2M-Washington Group Idaho, LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CH2M-Washington Group Idaho, LLC - CH2M-Washington Group Idaho, LLC - EA-2007-03 Preliminary Notice of Violation, CH2M-Washington Group Idaho, LLC - EA-2007-03 June 14, 2007 Preliminary Notice of Violation issued to CH2M-Washington Group Idaho, LLC, related to Radiation Protection Program Deficiencies at the Radioactive Waste Management Complex - Accelerated Retrieval Project at the Idaho National Laboratory This letter refers to the investigation of events at the Radioactive Waste Management Complex - Accelerated Retrieval Project (ARP) by the Department of Energy's (DOE) Office of Enforcement. The investigation summary report, Multiple Radiological Protection Program Deficiencies and Safety Culture Concerns, was provided to you in a letter dated February 20, 2007. An enforcement conference to discuss these findings was held on March

Note: This page contains sample records for the topic "washington offices bonneville" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Beep Beep! King County, Washington Is Charging Up Savings | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Beep Beep! King County, Washington Is Charging Up Savings Beep Beep! King County, Washington Is Charging Up Savings Beep Beep! King County, Washington Is Charging Up Savings April 12, 2011 - 5:48pm Addthis April Saylor April Saylor Former Digital Outreach Strategist, Office of Public Affairs What does this mean for me? King County used a $6.1 million grant to conduct energy efficiency upgrades. Upgrades included the installation of electric vehicle charging stations, county vehicle fleet upgrades and senior housing energy improvements. The county is helping lead a regional effort to install electric vehicle charging stations at strategic locations across the Puget Sound area. Residents of King County, Washington, are seeing several improvements in their community thanks to a $6.1 million Energy Efficiency and Conservation Block Grant (EECBG). The grant, which is funded by the

462

May 23 ChallengeHER Women Owned Small Business Event in Washington, DC |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 23 ChallengeHER Women Owned Small Business Event in Washington, May 23 ChallengeHER Women Owned Small Business Event in Washington, DC May 23 ChallengeHER Women Owned Small Business Event in Washington, DC May 6, 2013 - 4:48pm Addthis John Hale III John Hale III Director, Office of Small and Disadvantaged Business Utilization This April, the Small Business Administration (SBA) announced the ChallengeHER Campaign. The campaign is an exciting new initiative that leverages the resources of SBA, Women Impacting Public Policy, and American Express OPEN to promote the Women-Owned Small Business Federal Contract Program and bring more women-owned firms into the federal government's supply chain. Women owned small business are invited to join us on May 23 in Washington D.C. for a ChallengeHER summit. At this event, the federal government will

463

Naming of the Office of Science | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Naming of the Office of Science Naming of the Office of Science Basic Energy Sciences (BES) BES Home About Staff Organization Chart .pdf file (51KB) BES Budget BES Committees of Visitors Directions Jobs Organizational History Germantown Natural History President Kennedy's AEC Briefings Research Facilities Science Highlights Benefits of BES Funding Opportunities Basic Energy Sciences Advisory Committee (BESAC) News & Resources Contact Information Basic Energy Sciences U.S. Department of Energy SC-22/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3081 F: (301) 903-6594 E: sc.bes@science.doe.gov More Information » Organizational History Naming of the Office of Science Print Text Size: A A A RSS Feeds FeedbackShare Page Office of Science October 28, 1998 OFFICE OF ENERGY RESEARCH NOW OFFICE OF SCIENCE

464

US Department of Energy, Bonneville Power Administration US Army Corps of Engineers, North Pacific Division Columbia River System Operation Review Canadian Entitlement Allocation Extension Agreements Record of Decision; April 29, 1997  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Columbia River System Operation Review Columbia River System Operation Review Final Environmental Impact Statement Canadian Entitlement Allocation Extension Agreements Record of Decision Summary The Administrator and Chief Executive Officer (CEO) of the Bonneville Power Administration (BPA), acting for BPA, and, as Chairman of the United States Entity (the Administrator and the Division Engineer, North Pacific Division of the United States Army Corps of Engineers), acting on behalf of the United States Entity, has decided to adopt for the Canadian Entitlement Allocation Extension Agreements (CEAEA) a federal hydroelectric projects allocation of 72.5 percent and a non-Federal hydroelectric projects allocation of 27.5 percent. The Columbia River Treaty (Treaty), ratified in 1964, required the construction of three

465

Load Component Database of Household Appliances and Small Office Equipment  

Science Conference Proceedings (OSTI)

This paper discusses the development of a load component database for household appliances and office equipment. To develop more accurate load models at both transmission and distribution level, a better understanding on the individual behaviors of home appliances and office equipment under power system voltage and frequency variations becomes more and more critical. Bonneville Power Administration (BPA) has begun a series of voltage and frequency tests against home appliances and office equipments since 2005. Since 2006, Researchers at Pacific Northwest National Laboratory has collaborated with BPA personnel and developed a load component database based on these appliance testing results to facilitate the load model validation work for the Western Electricity Coordinating Council (WECC). In this paper, the testing procedure and testing results are first presented. The load model parameters are then derived and grouped. Recommendations are given for aggregating the individual appliance models to feeder level, the models of which are used for distribution and transmission level studies.

Lu, Ning; Xie, YuLong; Huang, Zhenyu; Puyleart, Francis; Yang, Steve

2008-07-24T23:59:59.000Z

466

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25, 2011 25, 2011 CX-006029: Categorical Exclusion Determination Acoustic Effects of Hydrokinetic Tidal Turbines CX(s) Applied: B3.3, B3.6 Date: 05/25/2011 Location(s): Snohomish County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 25, 2011 CX-006015: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant Program - Iowa-City-Cedar Rapids CX(s) Applied: A1, A9, A11, B1.32, B2.5, B3.6, B5.1 Date: 05/25/2011 Location(s): Cedar Rapids, Iowa Office(s): Energy Efficiency and Renewable Energy May 25, 2011 CX-006006: Categorical Exclusion Determination Deployment of Innovative Energy Efficiency and Renewable Energy - Agriculture CX(s) Applied: B5.1 Date: 05/25/2011 Location(s): The Dalles, Oregon Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

467

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2011 8, 2011 CX-006061: Categorical Exclusion Determination Photovoltaic System at Town Landfill CX(s) Applied: B5.1 Date: 06/08/2011 Location(s): Happauge, New York Office(s): Energy Efficiency and Renewable Energy, Golden Field Office June 8, 2011 CX-006060: Categorical Exclusion Determination City of Trenton Renewable Energy Feasibility Study CX(s) Applied: A9, A11 Date: 06/08/2011 Location(s): Trenton, New Jersey Office(s): Energy Efficiency and Renewable Energy, Golden Field Office June 8, 2011 CX-006049: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 06/08/2011 Location(s): Kent, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory June 8, 2011 CX-006047: Categorical Exclusion Determination

468

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2010 5, 2010 CX-001545: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant (EECBG) Program: City of Indianapolis, Indiana American Recovery and Reinvestment Act (ARRA)-EECBG CX(s) Applied: A9, A11, B5.1 Date: 04/15/2010 Location(s): Indianapolis, Indiana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 15, 2010 CX-002081: Categorical Exclusion Determination Carter Energy Efficiency Retrofits CX(s) Applied: B5.1 Date: 04/15/2010 Location(s): Carter, Oklahoma Office(s): Energy Efficiency and Renewable Energy April 15, 2010 CX-001821: Categorical Exclusion Determination SGL Automotive Carbon Limited Liability Company (LLC) CX(s) Applied: B5.1 Date: 04/15/2010 Location(s): Moses Lake, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

469

Better Buildings Neighborhood Program: Seattle, Washington  

NLE Websites -- All DOE Office Websites (Extended Search)

Seattle, Seattle, Washington to someone by E-mail Share Better Buildings Neighborhood Program: Seattle, Washington on Facebook Tweet about Better Buildings Neighborhood Program: Seattle, Washington on Twitter Bookmark Better Buildings Neighborhood Program: Seattle, Washington on Google Bookmark Better Buildings Neighborhood Program: Seattle, Washington on Delicious Rank Better Buildings Neighborhood Program: Seattle, Washington on Digg Find More places to share Better Buildings Neighborhood Program: Seattle, Washington on AddThis.com... Better Buildings Residential Network Progress Stories Interviews Videos Events Quick Links to Partner Information AL | AZ | CA | CO | CT FL | GA | IL | IN | LA ME | MD | MA | MI | MO NE | NV | NH | NJ | NY NC | OH | OR | PA | SC TN | TX | VT | VI | VA

470

Research, Washington, DC (United States) Sandia National Labs.,  

Office of Scientific and Technical Information (OSTI)

584878 SAND--95-2914 GeoEnergy technology 1980-12-31 USDOE Office of Energy 584878 SAND--95-2914 GeoEnergy technology 1980-12-31 USDOE Office of Energy Research, Washington, DC (United States) Sandia National Labs., Albuquerque, NM (United States) English 2010-02-18 Technical Report http://www.osti.gov/geothermal/servlets/purl/584878-P1qAuZ/webviewable/ http://www.osti.gov/energycitations/product.biblio.jsp?osti_id=584878 29 ENERGY PLANNING AND POLICY; RESEARCH PROGRAMS; COAL; PETROLEUM; NATURAL GAS; SYNTHETIC PETROLEUM; GEOTHERMAL ENERGY; ENERGY CONVERSION; PRODUCTION; HEAT EXTRACTION; US DOE; IN-SITU GASIFICATION; ENHANCED RECOVERY; COAL LIQUEFACTION; GEOTHERMAL WELLS Geothermal Legacy 894529 894529 Use of Geothermal Energy for Aquaculture Purposes - Phase III Johnson, W.C.; Smith, K.C. 1981-09-01 USDOE Geo-Heat Center, Klamath Falls, OR English

471

Comparison of Energy Information Administration and Bonneville Power Administration load forecasts  

SciTech Connect

Comparisons of the modeling methodologies underlying the project Independence Evaluation System (PIES) and the Bonneville Power Administration forecasts are discussed in this paper. This Technical Memorandum is presented in order to reconcile apparent inconsistencies between the forecasts. These represent different purposes for the modeling effort as well as different forecasts. Nonetheless, both are appropriate within the context that they are intended. The BPA forecasts are site-specific, detailed, micro-level, yearly forecasts of the demand for electricity. PIES develops regional, macro forecasts and does not contain estimates of the timing of the completion of plants within the period of the forecast. The BPA forecast is intended to be utilized in analyzing a sub-regional capacity expansion program. PIES is a regional energy market-clearing, non-normative model which allows different scenarios to be compared by changing input variables. Clearly, both forecasts are dependent upon the accuracy of the assumptions and input variables included. However, the differing levels of aggregation and objectives require different types of input variables.

Reed, H.J.

1978-06-01T23:59:59.000Z

472

30 MJ superconducting magnetic energy storage performance on the Bonneville Power Administration utility transmission system*  

DOE Green Energy (OSTI)

The 30 MJ, 10 MW superconducting magnetic energy storage (SMES) system was devised to interact in the Western U.S. Power System as an alternate means to damp unstable oscillations at 0.35 Hz on the Pacific HVAC Intertie. The SMES unit was installed at the Tacoma Substation of the Bonneville Power Administration (BPA). The operating limits of the 30 MJ SMES unit were established, and different means of controlling real and reactive power were tested. The unit can follow a sinusoidal power demand signal with an amplitude of up to 8.6 MW with the converter working in a 12 pulse mode. When the converter operates in the constant VAR mode, a time varying real power demand signal of up to 5 MW can be met. Experiments showed that the Pacific AC Intertie has current and reactive power variations of the same frequency as the modulating frequency of the SMES device. Endurance tests were run to assess the reliability of the SMES subsystems with a narrow band noise input, which is characteristic of the modulation signal for stabilizer operation. In this mode, the energy of the power spectrum is not concentrated at one frequency to avoid exciting a resonance frequency of the ac transmission system. During the endurance tests, parameters of the ac power system were determined. Accurate power system data are necessary for tuning the control algorithm so that the SMES unit can operate in the closed loop stabilizer mode.

Rogers, J.D.; Boenig, H.J.

1984-08-01T23:59:59.000Z

473

Bonneville Second Powerhouse Tailrace and High Flow Outfall: ADCP and drogue release field study  

DOE Green Energy (OSTI)

The Bonneville Project is one of four US Army Corps of Engineers operated dams along the Lower Columbia River. Each year thousands of smelt pass through this Project on their way to the Pacific Ocean. High flow outfalls, if specifically designed for fish passage, are thought to have as good or better smelt survival rates as spillways. To better understand the hydrodynamic flow field around an operating outfall, the Corps of Engineers commissioned measurement of water velocities in the tailrace of the Second Powerhouse. These data also are necessary for proper calibration and verification of three-dimensional numerical models currently under development at PNNL. Hydrodynamic characterization of the tailrace with and without the outfall operating was accomplished through use of a surface drogue and acoustic Doppler current profiler (ADCP). Both the ADCP and drogue were linked to a GPS (global positioning system); locating the data in both space and time. Measurements focused on the area nearest to the high flow outfall, however several ADCP transects and drogue releases were performed away from the outfall to document ambient flow field conditions when the outfall was not operating.

Cook, Chris B; Richmond, Marshall C; Guensch, Greg

2001-03-20T23:59:59.000Z

474

The Management of Post-Recovery Act Workforce Transition at Office...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management of Post-Recovery Act Workforce Transition at Office of Environmental Management Sites OAS-RA-12-06 February 2012 Department of Energy Washington, DC 20585 February 22,...

475

Slide01 | OSTI, US Dept of Energy, Office of Scientific and Technical...  

Office of Scientific and Technical Information (OSTI)

Dr. Walter Warnick, Director U.S. Department of Energy, Office of Scientific and Technical Information (OSTI) Web-Enabled Government Conference Washington, DC June 2, 2005 Add new...

476

The Battle of Wits Begins | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

& Testimony Recovery Act Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 01.16.13 The...

477

E. O. Lawrence Award Nominations | U.S. DOE Office of Science...  

Office of Science (SC) Website

& Testimony Recovery Act Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 12.04.12 E. O....

478

Honors and Awards | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Awards Transcribed Media PECASE Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 About Honors and...

479

Enrico Fermi Award Nominations | U.S. DOE Office of Science ...  

Office of Science (SC) Website

& Testimony Recovery Act Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 12.04.12 Enrico...

480

A Present . . . And A Future | U.S. DOE Office of Science (SC...  

Office of Science (SC) Website

Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 12.12.12 A Present . . . And A Future Students are...