  1. EA-1731: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Walla Walla-Tucannon River Transmission Line Rebuild Project, Walla Walla and Columbia Counties, Washington

  2. EA-1731: Mitigation Acton Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan Walla Walla-Tucannon River Transmission Line Rebuild Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Walla...

  3. Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    SciTech Connect (OSTI)

    Bronson, James P.; Duke, Bill; Loffink, Ken

    2008-12-30

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.

  4. 2007-2008 Annual Progress Report for BPA Grant Exp Restore Walla Walla River Flow

    SciTech Connect (OSTI)

    Bower, Bob

    2009-07-10

    WWBWC and its partners have been working on a wide variety of conservation and aquifer recharge related activities including: monitoring groundwater and surface water conditions, creating a geospatial database for the Walla Walla River valley (project focal area), expanding aquifer recharge testing at the HBDIC site and conducting an extensive outreach/education program by which to share the information, ideas and potential solutions to our current water management issues in this basin. This report is an outline of those activities and is accompanied by individual program-component (attached as appendices) reports for the areas that BPA is assisting to fund these on-the-ground projects along with the innovative research and monitoring being done to further aquifer recharge as a water management tool for the Pacific Northwest.

  5. Assessment of Salmonids and Their Habitat Conditions in the Walla Walla River Basin within Washington, Annual Report 2002-2003.

    SciTech Connect (OSTI)

    Mendel, Glen; Trump, Jeremy; Gembala, Mike

    2003-09-01

    This study began in 1998 to assess salmonid distribution, relative abundance, genetics, and the condition of salmonid habitats in the Walla Walla River basin. Stream flows in the Walla Walla Basin continue to show a general trend that begins with a sharp decline in discharge in late June, followed by low summer flows and then an increase in discharge in fall and winter. Manual stream flow measurements at Pepper bridge showed an increase in 2002 of 110-185% from July-September, over flows from 2001. This increase is apparently associated with a 2000 settlement agreement between the U.S. Fish and Wildlife Service (USFWS) and the irrigation districts to leave minimum flows in the river. Stream temperatures in the Walla Walla basin were similar to those in 2001. Upper montane tributaries maintained maximum summer temperatures below 65 F, while sites in mid and lower Touchet and Walla Walla rivers frequently had daily maximum temperatures well above 68 F (high enough to inhibit migration in adult and juvenile salmonids, and to sharply reduce survival of their embryos and fry). These high temperatures are possibly the most critical physiological barrier to salmonids in the Walla Walla basin, but other factors (available water, turbidity or sediment deposition, cover, lack of pools, etc.) also play a part in salmonid survival, migration, and breeding success. The increased flows in the Walla Walla, due to the 2000 settlement agreement, have not shown consistent improvements to stream temperatures. Rainbow/steelhead (Oncorhynchus mykiss) trout represent the most common salmonid in the basin. Densities of Rainbow/steelhead in the Walla Walla River from the Washington/Oregon stateline to Mojonnier Rd. dropped slightly from 2001, but are still considerably higher than before the 2000 settlement agreement. Other salmonids including; bull trout (Salvelinus confluentus), chinook salmon (Oncorhynchus tshawytscha), mountain whitefish (Prosopium williamsoni), and brown trout (Salmo trutta) had low densities, and limited distribution throughout the basin. A large return of adult spring chinook to the Touchet River drainage in 2001 produced higher densities of juvenile chinook in 2002 than have been seen in recent years, especially in the Wolf Fork. The adult return in 2002 was substantially less than what was seen in 2001. Due to poor water conditions and trouble getting personnel hired, spawning surveys were limited in 2002. Surveyors found only one redd in four Walla Walla River tributaries (Cottonwood Ck., East Little Walla Walla, West Little Walla Walla, and Mill Ck.), and 59 redds in Touchet River tributaries (10 in the North Fork Touchet, 30 in the South Fork Touchet, and 19 in the Wolf Fork). Bull trout spawning surveys in the upper Touchet River tributaries found a total of 125 redds and 150 live fish (92 redds and 75 fish in the Wolf Fork, 2 redds and 1 fish in the Burnt Fork, 0 redds and 1 fish in the South Fork Touchet, 29 redds and 71 fish in the North Fork Touchet, and 2 redds and 2 fish in Lewis Ck.). A preliminary steelhead genetics analysis was completed as part of this project. Results indicate differences between naturally produced steelhead and those produced in the hatchery. There were also apparent genetic differences among the naturally produced fish from different areas of the basin. Detailed results are reported in Bumgarner et al. 2003. Recommendations for assessment activities in 2003 included: (1) continue to monitor the Walla Walla River (focusing from the stateline to McDonald Rd.), the Mill Ck system, and the Little Walla Walla System. (2) reevaluate Whiskey Ck. for abundance and distribution of salmonids, and Lewis Ck. for bull trout density and distribution. (3) select or develop a habitat survey protocol and begin to conduct habitat inventory and assessment surveys. (4) summarize bull trout data for Mill Ck, South Fork Touchet, and Lewis Ck. (5) begin to evaluate temperature and flow data to assess if the habitat conditions exist for spring chinook in the Touchet River.

  6. Assessment of Salmonids and their Habitat Conditions in the Walla Walla River Basin within Washington, 2001 Annual Report.

    SciTech Connect (OSTI)

    Mendel, Glen Wesley; Trump, Jeremy; Karl, David

    2002-12-01

    Concerns about the decline of native salmon and trout populations have increased among natural resource managers and the public in recent years. As a result, a multitude of initiatives have been implemented at the local, state, and federal government levels. These initiatives include management plans and actions intended to protect and restore salmonid fishes and their habitats. In 1998 bull trout (Salvelinus confluentus) were listed under the Endangered Species Act (ESA), as ''Threatened'', for the Walla Walla River and its tributaries. Steelhead (Oncorhynchus mykiss) were listed as ''Threatened'' in 1999 for the mid-Columbia River and its tributaries. These ESA listings emphasize the need for information about these threatened salmonid populations and their habitats. The Washington Department of Fish and Wildlife (WDFW) is entrusted with ''the preservation, protection, and perpetuation of fish and wildlife....[and to] maximize public recreational or commercial opportunities without impairing the supply of fish and wildlife (WAC 77.12.010).'' In consideration of this mandate, the WDFW submitted a proposal in December 1997 to the Bonneville Power Administration (BPA) for a study to assess salmonid distribution, relative abundance, genetics, and the condition of salmonid habitats in the Walla Walla River basin. The primary purposes of this project are to collect baseline biological and habitat data, to identify major data gaps, and to draw conclusions whenever possible. The study reported herein details the findings of the 2001 field season (March to November, 2001).

  7. Assessment of Salmonids and their Habitat Conditions in the Walla Walla River Basin of Washington : 2000 Annual Report.

    SciTech Connect (OSTI)

    Mendel, Glen Wesley; Karl, David; Coyle, Terrence

    2001-11-01

    Concerns about the decline of native salmon and trout populations have increased among natural resource managers and the public in recent years. As a result, a multitude of initiatives have been implemented at the local, state, and federal government levels. These initiatives include management plans and actions intended to protect and restore salmonid fishes and their habitats. In 1998 bull trout were listed under the Endangered Species Act (ESA), as ''Threatened'', for the Walla Walla River and its tributaries. Steelhead were listed as ''Threatened'' in 1999 for the mid-Columbia River and its tributaries. These ESA listings emphasize the need for information about the threatened salmonid populations and their habitats. The Washington Department of Fish and Wildlife (WDFW) is entrusted with ''the preservation, protection, and perpetuation of fish and wildlife....[and to] maximize public recreational or commercial opportunities without impairing the supply of fish and wildlife (WAC 77. 12.010).'' In consideration of this mandate, the WDFW submitted a proposal in December 1997 to the Bonneville Power Administration (BPA) for a study to assess salmonid distribution, relative abundance, genetics, and the condition of their habitats in the Walla Walla River basin. The primary purposes of this project are to collect baseline biological and habitat data, to identify major data gaps, and to draw conclusions whenever possible. The study reported herein details the findings of the 2000 field season (March to November, 2000).

  8. Walla Walla River Basin Fish Screen Evaluations; Nursery Bridge Fishway and Garden City/Lowden II Sites, 2003 Technical Report.

    SciTech Connect (OSTI)

    Vucelick, J.; McMichael, G.

    2003-11-01

    Pacific Northwest National Laboratory evaluated the fish screens at the Nursery Bridge Fishway and the newly constructed Garden City/Lowden II site west of Walla Walla, Washington, in the Walla Walla River Basin during spring and summer 2003. Both fish screen facilities were examined to determine if they were being effectively operated and maintained to provide for safe fish passage. At the Nursery Bridge Fishway, the screens were evaluated specifically to determine whether the louvers that aid in controlling water flow from behind the screens could be adjusted so that the screens would meet fish protection criteria. Data were collected to determine whether velocities in front of the screens and in the bypasses met current National Oceanic and Atmospheric Administration Fisheries (NOAA Fisheries) (formerly National Marine Fisheries Service (NMFS)) criteria to promote safe and timely fish passage before and after changing the louver settings. Rock weirs downstream of the dam were also evaluated to determine whether they might impede upstream migration of juvenile salmonids during low flow conditions. At the Garden City/Lowden II site, data were collected to establish a baseline for operating conditions and to determine whether any changes in the baffle settings were needed.

  9. EIS-0495: Walla Walla Basin Spring Chinook Hatchery Program; Umatilla

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    County, Oregon | Department of Energy Walla Walla Basin Spring Chinook Hatchery Program; Umatilla County, Oregon EIS-0495: Walla Walla Basin Spring Chinook Hatchery Program; Umatilla County, Oregon SUMMARY Bonneville Power Administration (BPA) is preparing an EIS to analyze the potential environmental impacts of funding a proposal by the Confederated Tribes of the Umatilla Indian Reservation to construct and operate a hatchery for spring Chinook salmon in the Walla Walla River basin.

  10. Walla Walla River Basin Fish Screen Evaluations, 2003: Nursery Bridge Fishway and Garden City-Lowden II

    SciTech Connect (OSTI)

    Vucelick, Jessica A.; McMichael, Geoffrey A.

    2003-11-01

    The Pacific Northwest National Laboratory (PNNL) evaluated the fish screens at the Nursery Bridge Fishway and at the newly constructed Garden City-Lowden II site west of Walla Walla, Washington in the Walla Walla River Basin during the spring and summer of 2003. Both fish screen facilities were examined to determine if they were being effectively operated and maintained to provide for safe fish passage. At the Nursery Bridge Fishway, the screens were evaluated specifically to determine whether the louvers that aid in controlling water flow from behind the screens could be adjusted so that the screens would meet fish protection criteria. Data were collected to determine whether velocities in front of the screens and in the bypasses met current National Oceanic and Atmospheric Administration Fisheries ((NOAA Fisheries), formerly National Marine Fisheries Service (NMFS)) criteria to promote safe and timely fish passage before and after changing the louver settings. Rock weirs downstream of the dam were also evaluated to determine whether they might impede upstream migration of juvenile salmonids during low flow conditions. At the Garden City-Lowden II site, data were collected to establish a baseline for operating conditions and to determine whether any changes in the baffle settings were needed. Based on the results of our studies in 2003, we concluded: Nursery Bridge Site: (1) 68% of the initial velocity measurements on the west screen exceeded the NOAA Fisheries criteria of 0.4 ft/s for approach velocity; (2) A simple adjustment of the existing louvers was not sufficient to fix the problem; (3) The sediment and debris load in the river upstream of the screens exceeded the design criteria for the site, which had frequent breakdowns in the screen cleaning systems; and (4) The rock weirs downstream of the dam would not be expected to impede upstream movement of juvenile fish during low flow conditions. Garden City-Lowden II: (1) The flat inclined-plate screen design appeared to be efficiently protecting juvenile fish from entrainment, impingement and migration delay; (2) Approach velocities met the NMFS criteria of less than 0.4 ft/s in June, and no change in baffle settings was needed; (3) Sweep velocities were generally lower than approach velocities and did not increase toward the downstream end of the site; and (4) The automated cleaning system at the Garden City-Lowden II site works adequately when sediment loads are low, though its effectiveness at cleaning the screens decreases as sediment and debris loads and algal growth increase.

  11. Microsoft Word - XX 13 Public scoping Walla Walla Basin Spring...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    existing adult holding and spawning facility on the South Fork Walla Walla River near Milton-Freewater in Umatilla County, Ore. This is the latest project in an ongoing...

  12. Walla Walla County, Washington: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Burbank, Washington College Place, Washington Dixie, Washington Garrett, Washington Prescott, Washington Touchet, Washington Waitsburg, Washington Walla Walla East, Washington...

  13. EIS-0495: Walla Walla Basin Spring Chinook Hatchery Program; Umatilla County, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) is preparing an EIS to analyze the potential environmental impacts of funding a proposal by the Confederated Tribes of the Umatilla Indian Reservation to construct and operate a hatchery for spring Chinook salmon in the Walla Walla River basin.

  14. EIS-0495: Walla Walla Basin Spring Chinook Hatchery Program;...

    Broader source: Energy.gov (indexed) [DOE]

    Walla Walla Basin Spring Chinook Hatchery Program Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download...

  15. The Walla Walla Basin Natural Production Monitoring and Evaluation Project : Progress Report, 1999-2002.

    SciTech Connect (OSTI)

    Contor, Craig R.; Sexton, Amy D.

    2003-06-02

    The Walla Walla Basin Natural Production Monitoring and Evaluation Project (WWNPME) was funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) under the Walla Walla Basin Natural Production Monitoring and Evaluation Project (WWNPME). Chapter One provides an overview of the entire report and how the objectives of each statement of work from 1999, 2000, 2001, and 2002 contract years are organized and reported. Chapter One also provides background information relevant to the aquatic resources of the Walla Walla River Basin. Objectives are outlined below for the statements of work for the 1999, 2000, 2001 and 2002 contract years. The same objectives were sometimes given different numbers in different years. Because this document is a synthesis of four years of reporting, we gave objectives letter designations and listed the objective number associated with the statement of work for each year. Some objectives were in all four work statements, while other objectives were in only one or two work statements. Each objective is discussed in a chapter. The chapter that reports activities and findings of each objective are listed with the objective below. Because data is often interrelated, aspects of some findings may be reported or discussed in more than one chapter. Specifics related to tasks, approaches, methods, results and discussion are addressed in the individual chapters.

  16. Columbia basin project, Washington: Adams, Douglas, Franklin, Grant, Lincoln, and Walla Walla Counties

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    The Columbia Basin Project is a multipurpose development utilizing a portion of the resources of the Columbia River in the central part of the State of Washington. The key structure, Grand Coulee Dam, is on the main stem of the Columbia River about 90 miles west of Spokane, Wash. The extensive irrigation works extend southward on the Columbia Plateau 125 miles to the vicinity of Pasco, Wash., where the Snake and Columbia Rivers join.

  17. EIS-0163: 1992 Columbia River Salmon Flow Measures Options Analysis/EIS

    Broader source: Energy.gov [DOE]

    The U.S. Army Corps of Engineers – Walla Walla District prepared this statement to analyze four general alternatives to modify the flow of water in the lower Columbia-Snake River in order to help anadromous fish migrate past eight multipurpose Federal dams. The U.S. Department of Energy’s Bonneville Power Administration served as a cooperating agency due to its key role in direct operation of the integrated and coordinated Columbia-Snake River System, and adopted this statement on February 10, 1992.

  18. EIS-0163-S: Supplemental EIS/1993 Interim Columbia and Snake Rivers Flow Improvement Measures for Salmon

    Broader source: Energy.gov [DOE]

    The U.S. Army Corps of Engineers – Walla Walla District has prepared this statement to assess alternatives to improve flows of water in the lower Columbia-Snake rivers in 1993 and future years to assist the migration of juvenile and adult anadromous fish past eight hydropower dams. The U.S. Department of Energy’s Bonneville Power Administration served as a cooperating agency in developing this supplement due to its key role in direct operation of the integrated and coordinated Columbia-Snake River System, and adopted this statement in March of 1993. This statement supplements the 1992 Columbia River Salmon Flow Measures Options Analysis Environmental Impact Statement, which evaluated ways to alter water management operations in 1992 on the lower Columbia and Snake rivers to enhance the survival of wild Snake River salmon.

  19. EIS-0330: Wallula Power Project, Walla Walla County, WA

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's proposal to construct, operate, maintain, and decontaminate and decommission two depleted uranium hexafluoride (DUF 6) conversion facilities, at Portsmouth, Ohio, and Paducah, Kentucky.

  20. Research, Monitoring, and Evaluation of Avian Predation on Salmonid Smolts in the Lower and Mid-Columbia River, 2006 Final Season Summary.

    SciTech Connect (OSTI)

    Roby, Daniel D.; Collis, Ken; Lyons, Donald E.

    2009-06-18

    This study investigates predation by piscivorous waterbirds on juvenile salmonids (Oncorhynchus spp.) from throughout the Columbia River Basin. During 2006, study objectives in the Columbia River estuary, work funded by the Bonneville Power Administration, were to (1) monitor and evaluate previous management initiatives to reduce Caspian tern (Hydroprogne caspia) predation on juvenile salmonids (smolts); (2) measure the impact of double-crested cormorant (Phalacrocorax auritus) predation on smolt survival, and assess potential management options to reduce cormorant predation; and (3) monitor large colonies of other piscivorous waterbirds in the estuary (i.e., glaucous-winged/western gulls [Larus glaucescens/occidentalis]) to determine the potential impacts on smolt survival. Study objectives on the mid-Columbia River, work funded by the Walla Walla District of the U.S. Army Corps of Engineers, were to (1) measure the impact of predation by Caspian terns and double-crested cormorants on smolt survival; and (2) monitor large nesting colonies of other piscivorous waterbirds (i.e., California gulls [L. californicus], ring-billed gulls [L. delawarensis], American white pelicans [Pelecanus erythrorhynchos]) on the mid-Columbia River to determine the potential for significant impacts on smolt survival. Our efforts to evaluate system-wide losses of juvenile salmonids to avian predation indicated that Caspian terns and double-crested cormorants were responsible for the vast majority of smolt losses to avian predators in the Columbia Basin, with most losses occurring in the Columbia River estuary. In 2006, East Sand Island in the Columbia River estuary supported the largest known breeding colonies of Caspian terns and double-crested cormorants in the world. The Caspian tern colony on East Sand Island consisted of about 9,200 breeding pairs in 2006, up slightly (but not significantly so) from the estimate of colony size in 2005 (8,820 pairs). There has not been a statistically significant change in the size of the Caspian tern colony on East Sand Island since 2000. Tern nesting success averaged 0.72 fledglings per breeding pair in 2006, significantly higher than in 2005 (0.37 fledglings per breeding pair), a year of poor ocean conditions. Despite the presumably higher availability of marine forage fishes in 2006, the proportion of juvenile salmonids in diets of Caspian terns (32% of prey items) averaged higher than in 2005 (23% of prey items) and 2004 (18% of prey items). Steelhead smolts were particular vulnerable to predation by East Sand Island terns in 2006, with predation rates as high as 20% on particular groups of PIT-tagged fish reaching the estuary. Consumption of juvenile salmonids by terns nesting at the East Sand Island colony in 2006 was approximately 5.3 million smolts (95% c.i. = 4.4-6.2 million), significantly higher than the estimated 3.6 million smolts consumed in 2005, but still roughly 7 million fewer smolts consumed compared to 1998 (when all terns nested on Rice Island in the upper estuary). Caspian terns nesting on East Sand Island continue to rely primarily on marine forage fishes as a food supply, even in 2005 when availability of marine forage fishes declined due to poor ocean conditions. Further management of Caspian terns to reduce losses of juvenile salmonids would be implemented under the Caspian Tern Management Plan for the Columbia River Estuary; the Records of Decision (RODs) authorizing implementation of the plan were signed in November 2006. The ROD lists as the management goal the redistribution of approximately half of the East Sand Island Caspian tern colony to alternative colony sites in interior Oregon and San Francisco Bay, California (USFWS 2006). Implementation of the management plan is stalled, however, because of the lack of appropriated funds.

  1. Office of River Protection - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of River Protection Office of River Protection Office of River Protection Office of River Protection Email Email Page | Print Print Page |Text Increase Font Size Decrease...

  2. Lower Colorado River Authority | Department of Energy

    Office of Environmental Management (EM)

    of Lower Colorado River Authority's communications requirements

  3. Great River (1973)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  4. River of Power (1987)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  5. River and Harbors Act

    Broader source: Energy.gov [DOE]

    Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) prohibits the unauthorized obstruction or alteration of any navigable water of the United States.

  6. Savannah river site

    National Nuclear Security Administration (NNSA)

    at the Savannah River Site (SRS) to supply and process tritium, a radioactive form of hydrogen that is a vital component of nuclear weapons. SRS loads tritium and non-tritium...

  7. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    located downstream of the industrial facilities of T Area and upstream of the intake for pump station No. 3 of the Site river water distribution system. This area was dominated by...

  8. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (45.8 ha) Set-Aside Area, adjacent to the former location of the Savannah River Ecology Laboratory, is one of the original ten SREL habitat reserves and was selected to...

  9. Sky River Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    River Wind Farm Jump to: navigation, search Name Sky River Wind Farm Facility Sky River Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner...

  10. Sioux River Ethanol LLC | Open Energy Information

    Open Energy Info (EERE)

    River Ethanol LLC Jump to: navigation, search Name: Sioux River Ethanol LLC Place: Hudson, South Dakota Zip: 57034 Product: Farmer owned ethanol producer, Sioux River Ethanol is...

  11. Wing River Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search Name Wing River Wind Farm Facility Wing River Wind Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Wing River...

  12. Flambeau River Biofuels | Open Energy Information

    Open Energy Info (EERE)

    Flambeau River Biofuels Jump to: navigation, search Name: Flambeau River Biofuels Place: Park Falls, Wisconsin Sector: Biomass Product: A subsidiary of Flambeau River Papers LLC...

  13. Raft River Geothermal Facility | Open Energy Information

    Open Energy Info (EERE)

    Facility Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Raft River Geothermal Facility General Information Name Raft River Geothermal Facility Facility Raft River...

  14. Savannah River | Department of Energy

    Energy Savers [EERE]

    River Savannah River Following are compliance agreements for the Savannah River Site. Also included are short summaries of the agreements. PDF icon Natural Resources Defense Council Consent Decree, May 26, 1988 PDF icon Natural Resources Defense Council Consent Decree, May 26, 1988 Summary PDF icon Savannah River Site Consent Order 99-155-W, October 11, 1999 PDF icon Savannah River Site Consent Order 99-155-W, October 11, 1999 Summary PDF icon Savannah River Site Consent Order 85-70-SW, November

  15. Schlumberger soundings in the Upper Raft River and Raft River...

    Open Energy Info (EERE)

    soundings in the Upper Raft River and Raft River Valleys, Idaho and Utah Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Schlumberger soundings in the...

  16. Office of River Protection (ORP) and Washingotn River Protection Solutions,

    Office of Environmental Management (EM)

    LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project | Department of Energy Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project The Mission of the Office of River Protection is to safely retrieve and treat Hanford's tank waste and close the Tank Farms

  17. Lower Colorado River Authority | Department of Energy

    Office of Environmental Management (EM)

    from Lower Colorado River Authority on Smart Grid communications requirements

  18. Reese River Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    River Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Reese River Geothermal Project Project Location Information...

  19. Savannah River Site Robotics

    SciTech Connect (OSTI)

    2010-01-01

    Meet Sandmantis and Frankie, two advanced robotic devices that are key to cleanup at Savannah River Site. Sandmantis cleans hard, residual waste off huge underground storage tanks. Frankie is equipped with unique satellite capabilities and sensing abilties that can determine what chemicals still reside in the tanks in a cost effective manner.

  20. Savannah River Site Robotics

    ScienceCinema (OSTI)

    None

    2012-06-14

    Meet Sandmantis and Frankie, two advanced robotic devices that are key to cleanup at Savannah River Site. Sandmantis cleans hard, residual waste off huge underground storage tanks. Frankie is equipped with unique satellite capabilities and sensing abilties that can determine what chemicals still reside in the tanks in a cost effective manner.

  1. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    image of lab building SREL Home Faculty and Scientists Research Technical Reports Assessment of Radionuclide Monitoring in the CSRA Savannah River NERP Research Opportunities Field Sites / Data Research Facilities Low Dose Irradiation Facility Tritium Irrigation Facility Microsatellite Development Education Graduate Undergraduate Radioecology Curriculum Outreach Outreach Program SREL Herpetology Information for Visitors SREL Conference Center Maps and Directions Airports and Lodging Security

  2. Hood River Passive House

    SciTech Connect (OSTI)

    Hales, D.

    2013-03-01

    The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to reduce home energy use by 30%-50% (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project.

  3. Look to the River Columbia River Opens New Opportunities for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  4. Smith River Rancheria- 2006 Project

    Broader source: Energy.gov [DOE]

    Smith River Rancheria has a strong commitment to becoming energy self-sufficient, reduce their energy costs, and stimulate economic development in the community.

  5. about Savannah River National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    River National Laboratory (SRNL) maintains an active role in the research of tritium's impact on metal and the functionality of weapons systems. Not only does SRNL closely...

  6. RiverHeath Appleton, WI

    Broader source: Energy.gov [DOE]

    The goal of the project is to produce a closed loop neighborhood-wide geothermal exchange system using the river as the source of heat exchange.

  7. Employment | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Openings are posted on the UGA Human Resources website. To search for employment opportunities at SREL, select Department 267 (Savannah River Ecology Laboratory). UGA HR...

  8. River and Plateau Committee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 2012) Page 1 Area RAP Committee Area of Interest Issue Manager(s) (*denotes lead) Other interested committee members Focus/Product For FY2012 Framing Questions/Issues (Articulated by Issue Managers) Cross- cutting River Corridor 100 & 300 Areas (in order of expected document release) * 300 Area * 100 K Area * 100 F Area * 100 D & H Areas * 100 N Area * 100 B/C Area Shelley Cimon Dale Engstrom* Liz Mattson Jean Vanni Gerry Pollet Bob Suyama Wade Riggsbee 6 RODs RI/FS and Proposed

  9. River and Plateau Committee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 2011) Page 1 Area RAP Committee Area of Interest Issue Manager(s) (*denotes lead) Other interested committee members Focus/Product For FY2012 Framing Questions/Issues (Articulated by Issue Managers) Cross- cutting River Corridor 100 & 300 Areas * 100 B/C Area * 100 K Area * 100 N Area * 100 D & H Areas * 100 F Area * 300 Area Shelley Cimon Dale Engstrom* Liz Mattson Jean Vanni Gerry Pollet Bob Suyama Wade Riggsbee 6 RODs RI/FS and Proposed Plans to be issued between now &

  10. OFFICE OF RIVER PROTECTION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1-6-60 Richland, Washington 99352 SEP 3 0 2013 13 -CPM-0262 Mr. Charles A. Simpson, Contracts Manager Washington River Protection Solutions LLC 2440 Stevens Center Place Richland, Washington 99354 Mr. Simpson: CONTRACT NO. DE-AC27-08RVI4800 - TRANSMITTAL OF CONTRACT MODIFICATION 231 The purpose of this letter is to transmit the fully-executed Contract Modification 23 1. This modification revises the contract price for the base contract period and updates Section J, Attachment J.4, Performance

  11. North Sky River | Open Energy Information

    Open Energy Info (EERE)

    Sky River Jump to: navigation, search Name North Sky River Facility North Sky River Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra...

  12. Savannah River Site | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Operations / Acquisition and Project Management / Performance Evaluations / Savannah River Site Savannah River Site FY 2015 FY 2015 Performance Evaluation Plan, Savannah River Nuclear Solitions, LLC FY 2014 FY 2014 Performance Evaluation Report, Savannah River Nuclear Solutions, LLC FY 2014 Performance Evaluation Report, Fee Determination Letter, Savannah River Nuclear Solutions, LLC FY 2014 Performance Evaluation Plan, Savannah River Nuclear Solutions, LLC FY 2013 FY 2013 Performance Evaluation

  13. Hood River Passive House

    SciTech Connect (OSTI)

    Hales, David

    2014-01-01

    The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to "reduce home energy use by 30%-50% (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project. The design includes high R-Value assemblies, extremely tight construction, high performance doors and windows, solar thermal DHW, heat recovery ventilation, moveable external shutters and a high performance ductless mini-split heat pump. Cost analysis indicates that many of the measures implemented in this project did not meet the BA standard for cost neutrality. The ductless mini-split heat pump, lighting and advanced air leakage control were the most cost effective measures. The future challenge will be to value engineer the performance levels indicated here in modeling using production based practices at a significantly lower cost.

  14. Hood River Passive House

    SciTech Connect (OSTI)

    Hales, D.

    2014-01-01

    The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to reduce home energy use by 30%-50% (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project. The design includes high R-Value assemblies, extremely tight construction, high performance doors and windows, solar thermal DHW, heat recovery ventilation, moveable external shutters and a high performance ductless mini-split heat pump. Cost analysis indicates that many of the measures implemented in this project did not meet the BA standard for cost neutrality. The ductless mini-split heat pump, lighting and advanced air leakage control were the most cost effective measures. The future challenge will be to value engineer the performance levels indicated here in modeling using production based practices at a significantly lower cost.

  15. Green River Biodiesel Incorporated | Open Energy Information

    Open Energy Info (EERE)

    River Biodiesel Incorporated Jump to: navigation, search Name: Green River Biodiesel Incorporated Place: Houston, Texas Zip: 77056 Product: Biodiesel project developer and...

  16. Withlacoochee River Elec Coop | Open Energy Information

    Open Energy Info (EERE)

    Withlacoochee River Elec Coop Jump to: navigation, search Name: Withlacoochee River Elec Coop Place: Florida Phone Number: 352-567-5133 Website: www.wrec.net Twitter: https:...

  17. Independent Oversight Activity Report, Savannah River Site -...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - February 2014 Independent Oversight Activity Report, Savannah River Site - February 2014 February 2014 Operational Awareness Visit of the Savannah River Site...

  18. Kings River Conservation Dist | Open Energy Information

    Open Energy Info (EERE)

    Kings River Conservation Dist Jump to: navigation, search Name: Kings River Conservation Dist Place: California Phone Number: 559-237-5567 Website: www.krcd.org Facebook: https:...

  19. Wild and Scenic Rivers | Open Energy Information

    Open Energy Info (EERE)

    Scenic Rivers Jump to: navigation, search Retrieved from "http:en.openei.orgwindex.php?titleWildandScenicRivers&oldid612228" Feedback Contact needs updating Image...

  20. Beijing Haohua Rivers International Water Engineering Consulting...

    Open Energy Info (EERE)

    Haohua Rivers International Water Engineering Consulting Co Ltd Jump to: navigation, search Name: Beijing Haohua Rivers International Water Engineering Consulting Co.Ltd. Place:...

  1. River Hydrokinetic Resource Atlas | Open Energy Information

    Open Energy Info (EERE)

    dress":"","icon":"","group":"","inlineLabel":"","visitedicon":"" Hide Map Language: English River Hydrokinetic Resource Atlas Screenshot References: EPRI1 River Atlas2 The...

  2. Grand River Dam Authority | Open Energy Information

    Open Energy Info (EERE)

    River Dam Authority Place: Oklahoma Phone Number: 918-256-5545 Website: www.grda.com Twitter: @okgrda Facebook: https:www.facebook.compagesGrand-River-Dam-Authority...

  3. Voluntary Protection Program Onsite Review, Washington River...

    Energy Savers [EERE]

    Washington River Protection Solutions, LLC, Hanford - Feb 2014 Voluntary Protection Program Onsite Review, Washington River Protection Solutions, LLC, Hanford - Feb 2014 February...

  4. New Savannah River Site Deputy Manager Named

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. DOEs Savannah River Operations Office selected Terrel Terry J. Spears as the deputy manager of the Savannah River Site (SRS) this month.

  5. Project Management Institute Highlights Savannah River Nuclear...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Institute Highlights Savannah River Nuclear Solutions in Publication Project Management Institute Highlights Savannah River Nuclear Solutions in Publication February 6, 2014 -...

  6. Flambeau River Biofuels Demonstration-Scale Biorefinery

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Wisconsin (NewPage Corporation in Wisconsin Rapids and Flambeau River Papers, LLC in Park Falls). NewPage and Flambeau River have demonstrated successful collaboration on...

  7. Savannah River Site | Department of Energy

    Office of Environmental Management (EM)

    Savannah River Site | June 2011 Aerial View Savannah River Site (SRS) has mission responsibilities in nuclear weapons stockpile stewardship by ensuring the safe and reliable ...

  8. Enforcement Letter, Westinghouse Savannah River Company- April 19, 2004

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Employee Reprisal at the Savannah River Site

  9. Enforcement Letter, Westinghouse Savannah River Company- November 14, 2003

    Office of Energy Efficiency and Renewable Energy (EERE)

    Issued to Westinghouse Savannah River Company related to Criticality Safety Violations at the Savannah River Site

  10. Raft River Idaho Magnetotelluric Data

    SciTech Connect (OSTI)

    Gregory Nash

    2015-05-13

    Raw magnetotelluric (MT) data covering the geothermal system at Raft River, Idaho. The data was acquired by Quantec Geoscience. This is a zipped file containing .edi raw MT data files.

  11. Dayao County Yupao River BasDayao County Yupao River Basin Hydro...

    Open Energy Info (EERE)

    Dayao County Yupao River BasDayao County Yupao River Basin Hydro electricity Development Co Ltd in Jump to: navigation, search Name: Dayao County Yupao River BasDayao County Yupao...

  12. DOE to Extend Savannah River Nuclear Solutions Contract at Savannah River

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site to September 2016 | Department of Energy to Extend Savannah River Nuclear Solutions Contract at Savannah River Site to September 2016 DOE to Extend Savannah River Nuclear Solutions Contract at Savannah River Site to September 2016 September 6, 2012 - 12:00pm Addthis Media Contact Bill Taylor 803-952-8564 bill.taylor@srs.gov Aiken, SC -- The Department of Energy's (DOE) Savannah River Operations Office today exercised its option to extend the current Savannah River Site Management and

  13. Savannah River Site: Plutonium Preparation Project (PuPP) at Savannah River

    Energy Savers [EERE]

    Site | Department of Energy Site: Plutonium Preparation Project (PuPP) at Savannah River Site Savannah River Site: Plutonium Preparation Project (PuPP) at Savannah River Site Full Document and Summary Versions are available for download PDF icon Savannah River Site: Plutonium Preparation Project (PuPP) at Savannah River Site PDF icon Summary - Plutonium Preparation Project at the Savannah River Site More Documents & Publications EIS-0283-S2: Interim Action Determination EIS-0283-S2:

  14. Snake River Plain Geothermal Region | Open Energy Information

    Open Energy Info (EERE)

    Survey At Snake River Plain Region (DOE GTP) Micro-Earthquake At Snake River Plain Geothermal Region (1976) Reflection Survey At Snake River Plain Region (DOE GTP)...

  15. Independent Oversight Activity Report, Office of River Protection...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of River Protection - May 2013 Independent Oversight Activity Report, Office of River Protection - May 2013 May 2013 Operational Awareness Visit at the Office of River...

  16. Savannah River National Laboratory (SRNL) | Open Energy Information

    Open Energy Info (EERE)

    (Redirected from Savannah River National Laboratory) Jump to: navigation, search Logo: Savannah River National Laboratory Name: Savannah River National Laboratory Place: Aiken,...

  17. BLM Humboldt River Field Office | Open Energy Information

    Open Energy Info (EERE)

    River Field Office Jump to: navigation, search Name: BLM Humboldt River Field Office Abbreviation: Humboldt River Address: 5100 E. Winnemucca Blvd. Place: Winnemucca, Nevada Zip:...

  18. Voluntary Protection Program Onsite Review, Savannah River Remediation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Remediation, Llc, Liquid Waste Contract, Savannah River Site - November 2014 Voluntary Protection Program Onsite Review, Savannah River Remediation, Llc, Liquid...

  19. Green River, Utah, Disposal Site Fact Sheet

    Office of Legacy Management (LM)

    Green River, Utah, Disposal Site This fact sheet provides information about the Uranium Mill Tailings Radiation Control Act of 1978 Title I disposal site near Green River, Utah. This site is managed by the U.S. Department of Energy Office of Legacy Management. Location of the Green River, Utah, Disposal Site Site Description and History The Green River disposal site is about 0.5 mile east of the Green River and 1.5 miles southeast of the city of Green River, Utah. The site consists of an

  20. Concept Paper Savannah River Nuclear Solutions, LLC Savannah River Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Paper Savannah River Nuclear Solutions, LLC Savannah River Site Aiken, SC 29808 Michael S. Navetta, PE Manager- Energy Park Initiative (803) 952-8806 michael.navetta@srs.gov DRAFT Small Modular Reactor Demonstration Complex "One of the most promising areas is small modular reactors (SMRs). If we can develop this technology in the U.S. and build these reactors with American workers, we will have a key competitive edge. Our choice is clear: Develop these technologies today or import them

  1. Grays River Watershed Geomorphic Analysis

    SciTech Connect (OSTI)

    Geist, David R.

    2005-04-30

    This investigation, completed for the Pacific Northwest National Laboratory (PNNL), is part of the Grays River Watershed and Biological Assessment commissioned by Bonneville Power Administration under project number 2003-013-00 to assess impacts on salmon habitat in the upper Grays River watershed and present recommendations for habitat improvement. This report presents the findings of the geomorphic assessment and is intended to support the overall PNNL project by evaluating the following: 􀂃 The effects of historical and current land use practices on erosion and sedimentation within the channel network 􀂃 The ways in which these effects have influenced the sediment budget of the upper watershed 􀂃 The resulting responses in the main stem Grays River upstream of State Highway 4 􀂃 The past and future implications for salmon habi

  2. EA-273 Rainy River Energy Corporation | Department of Energy

    Energy Savers [EERE]

    Rainy River Energy Corporation EA-273 Rainy River Energy Corporation Order authorizing Rainy River Energy Corporation to export electric energy to Canada. PDF icon EA-273 Rainy River Energy Corporation More Documents & Publications EA-273-A

  3. EA-273-A Rainy River Energy Corporation | Department of Energy

    Energy Savers [EERE]

    -A Rainy River Energy Corporation EA-273-A Rainy River Energy Corporation Order authorizing Rainy River Energy Corporation to export electric energy to Canada. PDF icon EA-273-A Rainy River Energy Corporation More Documents & Publications EA-273

  4. Publications | Savannah River National Environmental Park

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Pauropoda (Myriapoda) of the Savannah River Plant, Aiken, South Carolina. Ulf Scheller. 1988. SRO-NERP-17. 99p. Download PDF Carolina Bays of the Savannah River Plant....

  5. An Inside Look at River Corridor

    Broader source: Energy.gov [DOE]

    In the seventh chapter of The Handford Story, the Energy Department takes a look at the River Corridor -- a 50-mile stretch of the Columbia River that flows through the Hanford site in southeast...

  6. Red River Biodiesel Ltd | Open Energy Information

    Open Energy Info (EERE)

    Ltd Jump to: navigation, search Name: Red River Biodiesel, Ltd. Place: Houston, Texas Zip: 77006 Product: Red River operates a biodiesel plant in Houstion, Texas with a capacity of...

  7. Preliminary Notice of Violation, Westinghouse Savannah River...

    Broader source: Energy.gov (indexed) [DOE]

    River Company - EA-97-11 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 98-09 Preliminary Notice of Violation, Kaiser-Hill Company, LLC - EA-1999-06...

  8. Platte River Power Authority | Open Energy Information

    Open Energy Info (EERE)

    search Name: Platte River Power Authority Place: Colorado Website: www.prpa.org Facebook: https:www.facebook.comPlatteRiverPower Outage Hotline: 1-888-748-5113 References:...

  9. Enforcement Letter, Savannah River Ecology Laboratory- June 7, 2000

    Broader source: Energy.gov [DOE]

    Issued to Savannah River Ecology Laboratory related to Radioactive Material Control Deficiencies at the Savannah River Site

  10. Conceptual Model At Raft River Geothermal Area (1988) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1988) Exploration Activity Details Location Raft River...

  11. Conceptual Model At Raft River Geothermal Area (1977) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  12. Field Mapping At Raft River Geothermal Area (1977) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Field Mapping At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  13. Geophysical Method At Raft River Geothermal Area (1975) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geophysical Method At Raft River Geothermal Area (1975) Exploration Activity Details Location Raft River...

  14. Field Mapping At Raft River Geothermal Area (1980) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Field Mapping At Raft River Geothermal Area (1980) Exploration Activity Details Location Raft River...

  15. Microearthquake surveys of Snake River plain and Northwest Basin...

    Open Energy Info (EERE)

    microearthquakes; Nevada; North America; passive systems; Pershing County Nevada; Raft River; reservoir rocks; seismic methods; seismicity; seismology; Snake River plain;...

  16. Core Analysis At Raft River Geothermal Area (1981) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Core Analysis At Raft River Geothermal Area (1981) Exploration Activity Details Location Raft River...

  17. Field Mapping At Raft River Geothermal Area (1990) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Field Mapping At Raft River Geothermal Area (1990) Exploration Activity Details Location Raft River...

  18. Conceptual Model At Raft River Geothermal Area (1987) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1987) Exploration Activity Details Location Raft River...

  19. Conceptual Model At Raft River Geothermal Area (1990) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1990) Exploration Activity Details Location Raft River...

  20. Conceptual Model At Raft River Geothermal Area (1983) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1983) Exploration Activity Details Location Raft River...

  1. Aeromagnetic Survey At Raft River Geothermal Area (1981) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Aeromagnetic Survey At Raft River Geothermal Area (1981) Exploration Activity Details Location Raft River...

  2. Core Analysis At Raft River Geothermal Area (1976) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Core Analysis At Raft River Geothermal Area (1976) Exploration Activity Details Location Raft River...

  3. Geophysical Method At Raft River Geothermal Area (1977) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geophysical Method At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  4. Exploratory Well At Raft River Geothermal Area (1977) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Exploratory Well At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  5. Exploratory Well At Raft River Geothermal Area (1975) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Exploratory Well At Raft River Geothermal Area (1975) Exploration Activity Details Location Raft River...

  6. Tracer Testing At Raft River Geothermal Area (1983) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Tracer Testing At Raft River Geothermal Area (1983) Exploration Activity Details Location Raft River...

  7. Aeromagnetic Survey At Raft River Geothermal Area (1978) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Aeromagnetic Survey At Raft River Geothermal Area (1978) Exploration Activity Details Location Raft River...

  8. Savannah River Field Office | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Field Offices / Savannah River Field Office Savannah River Field Office Learn More Mixed Oxide (MOX) Fuel Fabrication Facility

  9. Washington River Protection Solutions - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contracting Washington River Protection Solutions Contracting ORP Contracts and Procurements RL Contracts and Procurements CH2M HILL Plateau Remediation Company Mission Support Alliance Washington Closure Hanford HPM Corporation (HPMC) Wastren Advantage, Inc. Bechtel National, Inc. Washington River Protection Solutions Washington River Protection Solutions Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Washington River Protection Solutions, LLC logo The operation

  10. Columbia River Component Data Evaluation Summary Report

    SciTech Connect (OSTI)

    C.S. Cearlock

    2006-08-02

    The purpose of the Columbia River Component Data Compilation and Evaluation task was to compile, review, and evaluate existing information for constituents that may have been released to the Columbia River due to Hanford Site operations. Through this effort an extensive compilation of information pertaining to Hanford Site-related contaminants released to the Columbia River has been completed for almost 965 km of the river.

  11. Office of River Protection - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of River Protection Office of River Protection About ORP ORP Projects & Facilities Newsroom Contracts & Procurements Contact ORP Office of River Protection Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Hanford.gov Site Maintenance PHOENIX Tanks - Live Now Public Involvement Evaluation Survey Hanford Public Comment Period UNITED STATES DEPARTMENT OF ENERGY Office of River Protection The U.S. Department of Energy's (DOE) Hanford Site in southeast

  12. River Corridor Achievements | Department of Energy

    Energy Savers [EERE]

    Achievements River Corridor Achievements December 17, 2015 - 12:15pm Addthis Overall-RC-achievements_2015nw_756px - Copy.jpg Washington Closure Hanford and previous contractors have completed much of the cleanup work in the River Corridor, shown here. Addthis Related Articles EM Update Newsletter Spotlights River Corridor Cleanup at Hanford Site Washington Closure Hanford: Ten Years of River Corridor Cleanup The inset photo shows Hanford's 300 Area in 1982 in comparison to the area today, shown

  13. Categorical Exclusion Determinations: Savannah River Operations Office |

    Office of Environmental Management (EM)

    Department of Energy Savannah River Operations Office Categorical Exclusion Determinations: Savannah River Operations Office Categorical Exclusion Determinations issued by Savannah River Operations Office. DOCUMENTS AVAILABLE FOR DOWNLOAD April 6, 2015 CX-012595: Categorical Exclusion Determination Subcontractor Repair of Roof Leaks at 704-H CX(s) Applied: B1.3 Date: 41827 Location(s): South Carolina Offices(s): Savannah River Operations Office October 27, 2014 CX-012388: Categorical

  14. Bayer Material Science (TRL 1 2 3 System)- River Devices to Recover Energy with Advanced Materials(River DREAM)

    Broader source: Energy.gov [DOE]

    Bayer Material Science (TRL 1 2 3 System) - River Devices to Recover Energy with Advanced Materials(River DREAM)

  15. Smith River Rancheria- 2005 Project

    Broader source: Energy.gov [DOE]

    The Smith River Rancheria located just south of the Oregon border, on the coast, knows that developing a power-generation facility is a crucial part of its multifaceted plan for both economic development and reduction of energy costs. The activities associated with this grant will include the basic steps necessary to determine whether a generation facility will, in fact, benefit the tribe.

  16. HANFORD SITE RIVER CORRIDOR CLEANUP

    SciTech Connect (OSTI)

    BAZZELL, K.D.

    2006-02-01

    In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.

  17. Savannah River Plant/Savannah River Laboratory radiation exposure report

    SciTech Connect (OSTI)

    Rogers, C.D.; Hyman, S.D.; Keisler, L.L. and Co., Aiken, SC . Savannah River Plant); Reeder, D.F.; Jolly, L.; Spoerner, M.T.; Schramm, G.R. and Co., Aiken, SC . Savannah River Lab.)

    1989-01-01

    The protection of worker health and safety is of paramount concern at the Savannah River Site. Since the site is one of the largest nuclear sites in the nation, radiation safety is a key element in the protection program. This report is a compendium of the results in 1988 of the programs at the Savannah River Plant and the Savannah River Laboratory to protect the radiological health of employees. By any measure, the radiation protection performance at this site in 1988 was the best since the beginning of operations. This accomplishment was made possible by the commitment and support at all levels of the organizations to reduce radiation exposures to ALARA (As Low As Reasonably Achievable). The report provides detailed information about the radiation doses received by departments and work groups within these organizations. It also includes exposure data for recent years to allow Plant and Laboratory units to track the effectiveness of their ALARA efforts. Many of the successful practices and methods that reduced radiation exposure are described. A new goal for personnel contamination cases has been established for 1989. Only through continual and innovative efforts to minimize exposures can the goals be met. The radiation protection goals for 1989 and previous years are included in the report. 27 figs., 58 tabs.

  18. Voluntary Protection Program Onsite Review, Savannah River Nuclear

    Office of Environmental Management (EM)

    Solutions, Llc Savannah River Site - October 2014 | Department of Energy River Nuclear Solutions, Llc Savannah River Site - October 2014 Voluntary Protection Program Onsite Review, Savannah River Nuclear Solutions, Llc Savannah River Site - October 2014 October 2014 Recertification of SRNS as a Star Participant in the Department of Energy Voluntary Protection Program. This report summarizes the results from the evaluation of Savannah River Nuclear Solutions, LLC (SRNS), at the Savannah River

  19. Savannah River Laboratory Decontamination Program

    SciTech Connect (OSTI)

    Rankin, W.N.

    1991-01-01

    Savannah River Laboratory (SRL) has had a Decontamination and Decommissioning (D D) Technology program since 1981. The objective of this program is to provide state-of-the-art technology for use in D D operations that will enable our customers to minimize waste generated and personal exposure, increase productivity and safety, and to minimize the potential for release and uptake of radioactive material. The program identifies and evaluates existing technology, develops new technology, and provides technical assistance to implement its use onsite. This program has impacted not only the Savannah River Site (SRS), but the entire Department of Energy (DOE) complex. To document and communicate the technology generated by this program, 28 papers have been presented at National and International meetings in the United States and Foreign Countries.

  20. Savannah River Laboratory Decontamination Program

    SciTech Connect (OSTI)

    Rankin, W.N.

    1991-12-31

    Savannah River Laboratory (SRL) has had a Decontamination and Decommissioning (D&D) Technology program since 1981. The objective of this program is to provide state-of-the-art technology for use in D&D operations that will enable our customers to minimize waste generated and personal exposure, increase productivity and safety, and to minimize the potential for release and uptake of radioactive material. The program identifies and evaluates existing technology, develops new technology, and provides technical assistance to implement its use onsite. This program has impacted not only the Savannah River Site (SRS), but the entire Department of Energy (DOE) complex. To document and communicate the technology generated by this program, 28 papers have been presented at National and International meetings in the United States and Foreign Countries.

  1. Raft River geoscience case study

    SciTech Connect (OSTI)

    Dolenc, M.R.; Hull, L.C.; Mizell, S.A.; Russell, B.F.; Skiba, P.A.; Strawn, J.A.; Tullis, J.A.

    1981-11-01

    The Raft River Geothermal Site has been evaluated over the past eight years by the United States Geological Survey and the Idaho National Engineering Laboratory as a moderate-temperature geothermal resource. The geoscience data gathered in the drilling and testing of seven geothermal wells suggest that the Raft River thermal reservoir is: (a) produced from fractures found at the contact metamorphic zone, apparently the base of detached normal faulting from the Bridge and Horse Well Fault zones of the Jim Sage Mountains; (b) anisotropic, with the major axis of hydraulic conductivity coincident to the Bridge Fault Zone; (c) hydraulically connected to the shallow thermal fluid of the Crook and BLM wells based upon both geochemistry and pressure response; (d) controlled by a mixture of diluted meteoric water recharging from the northwest and a saline sodium chloride water entering from the southwest. Although the hydrogeologic environment of the Raft River geothermal area is very complex and unique, it is typical of many Basin and Range systems.

  2. The Columbia River System : the Inside Story.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1991-09-01

    The Columbia Ricer is one of the greatest natural resources in the western United States. The river and its tributaries touch the lives of nearly every resident of the Northwest-from providing the world-famous Pacific salmon to supplying the clean natural fuel for over 75 percent of the region's electrical generation. Since early in the century, public and private agencies have labored to capture the benefits of this dynamic river. Today, dozens of major water resource projects throughout the region are fed by the waters of the Columbia Basin river system. And through cooperative efforts, the floods that periodically threaten developments near the river can be controlled. This publication presents a detailed explanation of the planning and operation of the multiple-use dams and reservoirs of the Columbia River system. It describes the river system, those who operate and use it, the agreements and policies that guide system operation, and annual planning for multiple-use operation.

  3. Flambeau_River_Biofuels.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Flambeau_River_Biofuels.pdf Flambeau_River_Biofuels.pdf Flambeau_River_Biofuels.pdf PDF icon Flambeau_River_Biofuels.pdf More Documents & Publications Pacific Ethanol, Inc Flambeau River Biofuels Demonstration-Scale Biorefinery NewPage Demonstration-Scale Biorefinery

  4. U. S. Department of Energy Savannah River Operations Office - Tenant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Organizations Organizations Tenant Organizations Federal Offices National Nuclear Security Administration External Link Office of Environmental Management External Link U. S. Forest Service - Savannah River External Link Contractor Organizations Savannah River Nuclear Solutions External Link Savannah River National Laboratory External Link Savannah River Remediation External Link Centerra University of Georgia - Savannah River Ecology Laboratory External Link Shaw AREVA MOX Services External

  5. Three Rivers Builders The Three Rivers House 2015 Race to Zero Student Design Competition

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    i Three Rivers Builders The Three Rivers House 2015 Race to Zero Student Design Competition ii TABLE OF CONTENTS 1 Team Qualifications .............................................................................................................................. 1 1.1 Our Team ...................................................................................................................................... 1 1.2 Qualifications

  6. Deep drilling data, Raft River geothermal area, Idaho-Raft River...

    Open Energy Info (EERE)

    data, Raft River geothermal area, Idaho-Raft River geothermal exploration well sidetrack-C Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Deep drilling...

  7. Savannah River Site Waste Disposition Project

    Office of Environmental Management (EM)

    Terrel J. Spears Assistant Manager Waste Disposition Project DOE Savannah River Operations Office Savannah River Site Savannah River Site Waste Disposition Project Waste Disposition Project 2 Waste Disposition Project - Mission Radioactive Liquid Waste - Tank Waste Stabilization and Disposition - Disposition 36 million gallons of radioactive liquid waste - Close 49 underground storage tanks in which the waste now resides 3 36.7 Million 33.7 Mgal (92%) 3.0 Mgal (8%) Saltcake Sludge Salt Supernate

  8. Savannah River Site | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Locations / Savannah River Site Savannah River Site NNSA operates facilities at the Savannah River Site (SRS) to supply and process tritium, a radioactive form of hydrogen that is a vital component of nuclear weapons. SRS loads tritium and non-tritium reservoirs; including reclamation of previously used tritium reservoirs, receipt, packing and shipping of reservoirs; recycling, extraction, and enrichment of tritium gas and laboratory operations. SRS also plays a critical role in NNSA's

  9. Savannah River Needs Assessment | Department of Energy

    Energy Savers [EERE]

    Savannah River Needs Assessment Savannah River Needs Assessment June 23, 1998 This Needs Assessment for former Savannah River Site construction workers was developed for the purpose of collecting existing information relevant to exposure and health outcomes among former workers, utilizing this information to develop viable methods for contacting these former workers, and providing an initial determination of the most significant worker hazards, problems, and concerns for the site. PDF icon

  10. The Columbia River System Inside Story

    SciTech Connect (OSTI)

    2001-04-01

    The Columbia River is one of the greatest natural resources in the western United States. The river and its tributaries touch the lives of nearly every resident of the Pacific Northwestfrom fostering world-famous Pacific salmon to supplying clean natural fuel for 50 to 65 percent of the regions electrical generation. Since early in the 20th century, public and private agencies have labored to capture the benefits of this dynamic river. Today, dozens of major water resource projects throughout the region are fed by the waters of the Columbia Basin river system.

  11. River Valley Technology Center | Open Energy Information

    Open Energy Info (EERE)

    Valley Technology Center Jump to: navigation, search Name: River Valley Technology Center Place: United States Sector: Services Product: General Financial & Legal Services (...

  12. Gila River Indian Community- 2012 Project

    Broader source: Energy.gov [DOE]

    The Gila River Indian Community (GRIC) will conduct feasibility studies of potential renewable energy projects on its lands in south central Arizona.

  13. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enforcement (OE) investigation of the facts and circumstances concerning the unnecessary radiation exposure of three Westinghouse Savannah River Company (WSRC) personnel and the...

  14. Cuivre River Electric- Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Cuivre River Electric Cooperative, through the Take Control & Save program, offers rebates for cooperative members who purchase efficient geothermal and dual fuel heat pumps, and electric water...

  15. New Columbia River Estuary purchases benefit salmon

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the mouth of the Columbia River to permanently protect riverside habitat for Northwest fish and wildlife, including threatened and endangered salmon and steelhead. The...

  16. Brochure: Federal Columbia River Power System (FCRPS)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    these agencies maximize the use of the Columbia River by generating power, protecting fish and wildlife, controlling floods, providing irrigation and navigation, and sustaining...

  17. Power of the River History Book

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power-of-the-River-BPA-History-Book Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects &...

  18. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Achievable (ALARA) deficiencies that contributed to unplanned worker uptakes and the spread of contamination at DOE's Savannah River Site. PDF icon Preliminary Notice of...

  19. Beijing Changjiang River International Holding | Open Energy...

    Open Energy Info (EERE)

    100761 Sector: Services Product: Beijing Changjiang River International Holding is a Chinese emissions broker and services company. Coordinates: 39.90601, 116.387909 Show Map...

  20. Savannah River National Laboratory (SRNL) Environmental Sciences...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Laboratory (SRNL) Environmental Sciences and Biotechnology Support of Waste Isolation Pilot Plant (WIPP) Savannah River National Laboratory (SRNL) Environmental Sciences...

  1. Lumbee River EMC- Residential Energy Efficiency Program

    Broader source: Energy.gov [DOE]

    Lumbee River EMC (LREMC) offers rebates to its residential customers who purchase and install qualified energy efficient products or services. Rebates are available for:

  2. Savannah River Remediation (SRR) Expanded Staff Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Savannah River Remediation Delivering the Mission Dave Olson President and Project Manager January 27, 2012 SRS Executive Management Community Discussion 2 * Liquid Waste Funding...

  3. Big River Resources LLC | Open Energy Information

    Open Energy Info (EERE)

    Resources LLC Jump to: navigation, search Name: Big River Resources LLC Place: West Burlington, Iowa Zip: 52655 Product: Dry-mill bioethanol producer with a cooperative structure....

  4. Enforcement Letter, Westinghouse Savannah River Company - November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Company related to repeated criticality safety violations in 2002 and 2003 at the H-Canyon facility at DOE's Savannah River Site. PDF icon Enforcement Letter, Westinghouse...

  5. Two Rivers Water & Light | Open Energy Information

    Open Energy Info (EERE)

    Water & Light Jump to: navigation, search Name: Two Rivers Water & Light Place: Wisconsin Phone Number: (920) 793-5550 Website: trwaterandlight.com Facebook: https:...

  6. Big Rivers Electric Corp | Open Energy Information

    Open Energy Info (EERE)

    (270) 827-2561 Website: www.bigrivers.com Facebook: https:www.facebook.compagesBig-Rivers-Electric-Corporation142180855818082?rf154289971250771 Outage Hotline: (270)...

  7. Brazos River Authority | Open Energy Information

    Open Energy Info (EERE)

    Place: Texas Phone Number: 1-888-922-6272 Website: www.brazos.org Facebook: https:www.facebook.compagesBrazos-River-Authority126719790675809?frefts Outage Hotline:...

  8. Lower Colorado River Authority | Open Energy Information

    Open Energy Info (EERE)

    Name: Lower Colorado River Authority Place: Texas Website: www.lcra.orgPagesdefault.asp Twitter: @lcra Facebook: https:www.facebook.comlowercoloradoriverauthority Outage...

  9. River Corridor Closure Project Partnering Performance Agreement...

    Office of Environmental Management (EM)

    - March 2009 Voluntary Protection Program Onsite Review, River Corridor Closure Project - June 2012 Indoctrinating Subcontractors into the DOE Safety Culture and Expectations...

  10. Savannah River Laboratory monthly report, October 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separations operations; environmental concerns; and waste management. (FI)

  11. Savannah River Laboratory monthly report, October 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separations operations; environmental concerns; and waste management. (FI)

  12. Rebecca Sharitz | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The research in my laboratory is directed chiefly toward ecological processes in wetlands, including factors affecting the structure and function of river floodplain and swamp...

  13. ENVIRONMENTAL SCIENCES; SAVANNAH RIVER PLANT; ENVIRONMENTAL EFFECTS...

    Office of Scientific and Technical Information (OSTI)

    5 audit of SRP radioactive waste Ashley, C. 05 NUCLEAR FUELS; 54 ENVIRONMENTAL SCIENCES; SAVANNAH RIVER PLANT; ENVIRONMENTAL EFFECTS; RADIOACTIVE EFFLUENTS; EMISSION; HIGH-LEVEL...

  14. Savannah River Remediation, College Create Job Opportunities...

    Office of Environmental Management (EM)

    Tony Spence, who graduated from ATC, performs radiation monitoring duties. AIKEN, S.C. - Savannah River Remediation (SRR), the liquid waste contractor for the EM program at...

  15. Exhibits | Savannah River Ecology Laboratory Environmental Outreach...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    biodiversity of local ecosystems. If you are interested in having the Savannah River Ecology Laboratory participate in your event with a live animal and plant exhibit, you need...

  16. Home | Savannah River Ecology Laboratory Environmental Outreach...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    about the diverse ecological research conducted by scientists at the Savannah River Ecology Laboratory. Today, the Outreach Program continues to provide a great variety of...

  17. Savannah River Laboratory monthly report, November 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  18. Savannah River Laboratory monthly report, November 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  19. Savannah River Laboratory monthly report, September 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  20. Savannah River Laboratory monthly report, September 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  1. Savannah River Laboratory monthly report, July 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  2. Savannah River Laboratory monthly report, July 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  3. Savannah River Laboratory monthly report, August 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  4. Savannah River Laboratory monthly report, August 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  5. Hood River Passive House, Hood River, Oregon (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-02-01

    The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to "reduce home energy use by 30%-50%" (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project. The design includes high R-Value assemblies, extremely tight construction, high performance doors and windows, solar thermal DHW, heat recovery ventilation, moveable external shutters and a high performance ductless mini-split heat pump. Cost analysis indicates that many of the measures implemented in this project did not meet the BA standard for cost neutrality. The ductless mini-split heat pump, lighting and advanced air leakage control were the most cost effective measures. The future challenge will be to value engineer the performance levels indicated here in modeling using production based practices at a significantly lower cost.

  6. Smith River Rancheria- 2003 Project

    Broader source: Energy.gov [DOE]

    Implement a planning effort that addresses current and future energy needs and results in a long-term sustainable plan for energy self-sufficiency on the Rancheria. The Smith River Rancheria, located in northern Del Norte County, California about four miles south of the Oregon border on the Pacific Ocean, composes 184.4 acres. This effort is intended to promote energy self-sufficiency and assist in meeting the tribe's goal to preserve and protect the aboriginal territory of the Tolowa People.

  7. Florida Nuclear Profile - Crystal River

    U.S. Energy Information Administration (EIA) Indexed Site

    Crystal River1" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date" 3,860,0,"--","PWR","application/vnd.ms-excel","application/vnd.ms-excel" ,860,0,"--" "Data for 2010" "1 Unit was offline in 2010 for repairs." "-- Not applicable.

  8. Louisiana Nuclear Profile - River Bend

    U.S. Energy Information Administration (EIA) Indexed Site

    River Bend" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date" 1,974,"8,363",98.0,"BWR","application/vnd.ms-excel","application/vnd.ms-excel" ,974,"8,363",98.0 "Data for 2010" "BWR = Boiling

  9. Comments of the Lower Colorado River Authority | Department of Energy

    Office of Environmental Management (EM)

    Lower Colorado River Authority Comments of the Lower Colorado River Authority Comments of the Lower Colorado River Authority on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy PDF icon Comments of the Lower Colorado River Authority More Documents & Publications Lower Colorado River Authority Lower Colorado River Authority NBP RFI: Communications Requirements- Comments of Meeker Cooperative Light

  10. EA-1692: Red River Environmental Products, LLC Activated Carbon

    Office of Environmental Management (EM)

    Manufacturing Facility, Red River Parish, LA | Department of Energy 2: Red River Environmental Products, LLC Activated Carbon Manufacturing Facility, Red River Parish, LA EA-1692: Red River Environmental Products, LLC Activated Carbon Manufacturing Facility, Red River Parish, LA June 1, 2010 EA-1692: Final Environmental Assessment Construction and Start-Up of an Activated Carbon Manufacturing Facility in Red River Parish, Louisiana June 11, 2010 EA-1692: Finding of No Significant Impact Red

  11. Wild and Scenic Rivers Act (1968)

    Broader source: Energy.gov [DOE]

    The National Wild and Scenic Rivers System was created by Congress in 1968 (Public Law 90-542; 16 U.S.C. 1271 et seq.) to preserve certain rivers with outstanding natural, cultural, and recreational values in a free-flowing condition for the enjoyment of present and future generations.

  12. River and Plateau Committee Summaries - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Advisory Board Committee Meeting Information River and Plateau Committee Hanford Advisory Board Convening Report SSAB Guidance Memorandum of Understanding Membership Nomination and Appointment Process Operating Ground Rules Calendars Advice and Responses Full Board Meeting Information Committee Meeting Information Outgoing Board Correspondence Key Board Products and Special Reports HAB Annual Report HAB and Committee Lists Points of Contact Related Links River and Plateau Committee

  13. Savannah River Site Environmental Report for 1998

    SciTech Connect (OSTI)

    Arnett, M.

    1999-06-09

    The mission at the Savannah River Site (SRS) is focused primarily on support of the national defense, nonproliferation, and environmental cleanup. SRS-through its prime operating contractor, Westinghouse Savannah River Company-continues to maintain a comprehensive environmental monitoring program.

  14. Independent Oversight Follow-up Review, Savannah River National...

    Energy Savers [EERE]

    Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site This report provides the results of an independent review...

  15. White River Electric Assn, Inc | Open Energy Information

    Open Energy Info (EERE)

    Assn, Inc Jump to: navigation, search Name: White River Electric Assn, Inc Place: Colorado Website: www.white-river-electric-assoc Twitter: @WREAColorado Facebook: https:...

  16. Tianlin Baile River Hydropower Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Baile River Hydropower Co Ltd Jump to: navigation, search Name: Tianlin Baile River Hydropower Co., Ltd. Place: Baise, Guangxi Autonomous Region, China Zip: 533300 Sector: Hydro...

  17. Reed River Hot Spring Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Reed River Hot Spring Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Reed River Hot Spring Geothermal Area Contents 1 Area Overview 2 History and...

  18. Yingjiang County Binglang River Hydroelectric Power Co Ltd |...

    Open Energy Info (EERE)

    Yingjiang County Binglang River Hydroelectric Power Co Ltd Jump to: navigation, search Name: Yingjiang County Binglang River Hydroelectric Power Co., Ltd. Place: Dehong Dai-Jingpo...

  19. Ground Gravity Survey At Snake River Plain Region (DOE GTP) ...

    Open Energy Info (EERE)

    Ground Gravity Survey At Snake River Plain Region (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Snake River...

  20. Interagency Wild and Scenic Rivers Coordinating Council's WSRA...

    Open Energy Info (EERE)

    to use the flowcharts created by the Interagency Wild and Scenic Rivers Coordinating Council. Author The Interagency Wild and Scenic Rivers Coordinating Council Published The...

  1. Micro-Earthquake At Snake River Plain Geothermal Region (1976...

    Open Energy Info (EERE)

    Micro-Earthquake At Snake River Plain Geothermal Region (1976) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Snake River...

  2. Enforcement Letter, Westinghouse Savannah River Company- June 4, 1996

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Potential Violations of the Quality Assurance and Occupational Radiation Protection Rules at the Savannah River Site

  3. Exhibit D: Mirant Potomac River Schedule of Operations: January...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations: January and February 2006 Exhibit D: Mirant Potomac River Schedule of Operations: January and February 2006 Docket No. EO-05-01. Exhibit D: Mirant Potomac River...

  4. CRAD, Emergency Management - Office of River Protection K Basin...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System May 2004 A section ...

  5. John C. Barnes of Savannah River Operations named 2012 Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year John C. Barnes of Savannah River Operations named 2012 Facility Representative of the ...

  6. ITP LEADER Case Study: Flambeau River Papers Makes a Comeback...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LEADER Case Study: Flambeau River Papers Makes a Comeback With a Revised Energy Strategy ITP LEADER Case Study: Flambeau River Papers Makes a Comeback With a Revised Energy ...

  7. PIA - Savannah River Nuclear Solution SRNS ProRad Environment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SRNS ProRad Environment Management PIA - Savannah River Nuclear Solution SRNS ProRad Environment Management PIA - Savannah River Nuclear Solution SRNS ProRad Environment Management...

  8. Enforcement Letter, Westinghouse Savannah River Company- April 15, 1997

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Potential Violations of Quality Assurance and Work Process Requirements at the Savannah River Site

  9. Gengma County Tiechang River Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Gengma County Tiechang River Power Plant Jump to: navigation, search Name: Gengma County Tiechang River Power Plant Place: Lincang City, Yunnan Province, China Zip: 666100 Sector:...

  10. Zijin County East River Fengguang Likou Power Plant Development...

    Open Energy Info (EERE)

    Zijin County East River Fengguang Likou Power Plant Development Co Ltd Jump to: navigation, search Name: Zijin County East River Fengguang Likou Power Plant Development Co.Ltd...

  11. Yingjiang Nanpian River Electricity Exploring Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Nanpian River Electricity Exploring Co Ltd Jump to: navigation, search Name: Yingjiang Nanpian River Electricity Exploring Co., Ltd. Place: Dehong Dai-Jingpo Autonomous Prefecture,...

  12. EA-1973: Kootenai River Restoration at Bonners Ferry, Boundary...

    Energy Savers [EERE]

    73: Kootenai River Restoration at Bonners Ferry, Boundary County, Idaho EA-1973: Kootenai River Restoration at Bonners Ferry, Boundary County, Idaho Summary Bonneville Power...

  13. Jichuan Taiyang River Hydro Power Development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Jichuan Taiyang River Hydro Power Development Co Ltd Jump to: navigation, search Name: Jichuan Taiyang River Hydro Power Development Co., Ltd. Place: Sichuan Province, China Zip:...

  14. Yunnan Daoyao County Duodi River Hydro Power Development Co Ltd...

    Open Energy Info (EERE)

    Daoyao County Duodi River Hydro Power Development Co Ltd Jump to: navigation, search Name: Yunnan Daoyao County Duodi River Hydro Power Development Co., Ltd. Place: Yunnan...

  15. Gansu Diantou Tao River Hydro Power Development Co Ltd | Open...

    Open Energy Info (EERE)

    River Hydro Power Development Co Ltd Jump to: navigation, search Name: Gansu Diantou Tao River Hydro Power Development Co. Ltd. Place: Lanzhou, Gansu Province, China Zip: 730030...

  16. Huanghe Hydropower Development Co Ltd Yellow River Group | Open...

    Open Energy Info (EERE)

    Huanghe Hydropower Development Co Ltd Yellow River Group Jump to: navigation, search Name: Huanghe Hydropower Development Co Ltd (Yellow River Group) Place: Xining, Qinghai...

  17. Independent Activity Report, Office of River Protection Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of River Protection Waste Treatment Plant and Tank Farms - February 2013 Independent Activity Report, Office of River Protection Waste Treatment Plant and Tank Farms - February...

  18. Tongue River Electric Coop Inc | Open Energy Information

    Open Energy Info (EERE)

    Tongue River Electric Coop Inc Jump to: navigation, search Name: Tongue River Electric Coop Inc Place: Montana Phone Number: 406-784-2341 Website: tongueriverelectric.com...

  19. Lessons Learned and Best Practices in Savannah River Site Saltstone...

    Office of Environmental Management (EM)

    Lessons Learned and Best Practices in Savannah River Site Saltstone and Tank Farm Performance Assessments Lessons Learned and Best Practices in Savannah River Site Saltstone and...

  20. Kings River Conservation District (KRCD) Solar Farm Solar Power...

    Open Energy Info (EERE)

    River Conservation District (KRCD) Solar Farm Solar Power Plant Jump to: navigation, search Name Kings River Conservation District (KRCD) Solar Farm Solar Power Plant Facility...

  1. EM's Office of River Protection Completes Waste Retrieval in...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of River Protection Completes Waste Retrieval in Another Hanford Tank EM's Office of River Protection Completes Waste Retrieval in Another Hanford Tank December 29, 2015 -...

  2. Savannah River National Laboratory (SRNL) | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Logo: Savannah River National Laboratory Name: Savannah River National Laboratory Place: Aiken, South Carolina Zip: 29808 Website: srnl.doe.gov...

  3. Columbia River PUD- Commercial Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Columbia River PUD offers a variety of rebates to commercial and industrial customers who make energy saving improvements to facilities. Visit Columbia River PUD's website for specific program...

  4. Red River Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Red River Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Red River Hot Springs Geothermal Area Contents 1 Area Overview 2 History and...

  5. Red River Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Red River Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Red River Hot...

  6. Injectivity Test At Raft River Geothermal Area (1979) | Open...

    Open Energy Info (EERE)

    navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Injectivity Test At Raft River Geothermal Area (1979) Exploration Activity Details Location Raft River...

  7. Flow Test At Raft River Geothermal Area (1979) | Open Energy...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Raft River Geothermal Area (1979) Exploration Activity Details Location Raft River...

  8. Flow Test At Raft River Geothermal Area (2008) | Open Energy...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Raft River Geothermal Area (2008) Exploration Activity Details Location Raft River...

  9. Flow Test At Raft River Geothermal Area (2004) | Open Energy...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Raft River Geothermal Area (2004) Exploration Activity Details Location Raft River...

  10. Flow Test At Raft River Geothermal Area (2006) | Open Energy...

    Open Energy Info (EERE)

    Flow Test At Raft River Geothermal Area (2006) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Raft River Geothermal Area (2006)...

  11. Trona Injection Tests: Mirant Potomac River Station, Unit 1,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Trona Injection Tests: Mirant Potomac River Station, Unit 1, November 12 to December 23, 2005, Summary Report Trona Injection Tests: Mirant Potomac River Station, Unit 1, November ...

  12. Independent Oversight Review, Savannah River Site Salt Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 August 2013 Review of the Savannah River Site Salt Waste Processing...

  13. Enterprise Assessments Review of the Savannah River Site Salt...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Savannah River Site Salt Waste Processing Facility Construction Quality and Startup Test Plans - June 2015 Enterprise Assessments Review of the Savannah River Site...

  14. Elk River Business Incubator Program | Open Energy Information

    Open Energy Info (EERE)

    Business Incubator Program Jump to: navigation, search Name: Elk River Business Incubator Program Place: Minnesota Zip: 55330 Product: Program run by Elk River Energy City....

  15. Concept Paper Savannah River Nuclear Solutions, LLC Savannah...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Savannah River Nuclear Solutions, LLC Savannah River Site Aiken, SC 29808 Michael S. Navetta, PE Manager- Energy Park ... "I am convinced that whoever builds a clean energy economy, ...

  16. Geothermometry At New River Area (DOE GTP) | Open Energy Information

    Open Energy Info (EERE)

    New River Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geothermometry At New River Area (DOE GTP) Exploration Activity Details...

  17. Refraction Survey At Snake River Plain Region (DOE GTP) | Open...

    Open Energy Info (EERE)

    Snake River Plain Region (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Refraction Survey At Snake River Plain Region (DOE GTP)...

  18. Magnetotellurics At New River Area (DOE GTP) | Open Energy Information

    Open Energy Info (EERE)

    New River Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Magnetotellurics At New River Area (DOE GTP) Exploration Activity...

  19. Letter from Commonwealth to Mirant Potomac River Concerning Serious...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Mirant Potomac River Concerning Serious Violations of the National Ambient Air Quality Standards for Sulfur Dioxide Letter from Commonwealth to Mirant Potomac River Concerning...

  20. Notice of Unplanned Outage at the Mirant Potomac River Plant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the District of Columbia. PDF icon Notice of Unplanned Outage at the Mirant Potomac River Plant More Documents & Publications Re: Potomac River Generating Station Department of ...

  1. U. S. Department of Energy Savannah River Operations Office ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Reaches Significant Milestone with Waste Tank Closure SR-2012-06 Adobe Acrobat PDF DOE to Extend Savannah River Nuclear Solutions Contract at Savannah River Site to...

  2. Applicability of a Hybrid Retorting Technology in the Green River...

    Office of Environmental Management (EM)

    Applicability of a Hybrid Retorting Technology in the Green River Formation Applicability of a Hybrid Retorting Technology in the Green River Formation A broad range of new ...

  3. Office of River Protection's (ORP) Path to Reinvigorating Technology...

    Office of Environmental Management (EM)

    Office of River Protection's (ORP) Path to Reinvigorating Technology Development Presentation from the 2015 DOE National Cleanup Workshop by Kevin Smith, Manager, Office of River ...

  4. Ground Magnetics At Raft River Geothermal Area (1979) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Raft River Geothermal Area (1979)...

  5. Numerical Modeling At Raft River Geothermal Area (1983) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Numerical Modeling At Raft River Geothermal Area (1983)...

  6. Micro-Earthquake At Raft River Geothermal Area (1979) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Raft River Geothermal Area (1979) Exploration Activity Details Location Raft River...

  7. Fluid Inclusion Analysis At Raft River Geothermal Area (2011...

    Open Energy Info (EERE)

    Raft River Geothermal Area (2011) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Fluid Inclusion Analysis At Raft River Geothermal Area (2011)...

  8. Cuttings Analysis At Raft River Geothermal Area (1976) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1976) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Cuttings Analysis At Raft River Geothermal Area (1976)...

  9. Update on the Raft River Geothermal Reservoir | Open Energy Informatio...

    Open Energy Info (EERE)

    the Raft River Geothermal Reservoir Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Proceedings: Update on the Raft River Geothermal Reservoir...

  10. Groundwater Sampling At Raft River Geothermal Area (1974-1982...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Groundwater Sampling At Raft River Geothermal Area (1974-1982) Exploration Activity Details Location Raft River...

  11. Micro-Earthquake At Raft River Geothermal Area (2011) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Raft River Geothermal Area (2011) Exploration Activity Details Location Raft River...

  12. Electromagnetic Soundings At Raft River Geothermal Area (1977...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1977) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Electromagnetic Soundings At Raft River Geothermal Area (1977)...

  13. Thermochronometry At Raft River Geothermal Area (1993) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1993) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Thermochronometry At Raft River Geothermal Area (1993)...

  14. Isotopic Analysis-Fluid At Raft River Geothermal Area (1982)...

    Open Energy Info (EERE)

    GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Isotopic Analysis-Fluid At Raft River Geothermal Area (1982) Exploration Activity Details Location Raft River...

  15. Telluric Survey At Raft River Geothermal Area (1978) | Open Energy...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1978) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Telluric Survey At Raft River Geothermal Area (1978)...

  16. Ground Gravity Survey At Raft River Geothermal Area (1978) |...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Raft River Geothermal Area (1978) Exploration Activity Details Location Raft River...

  17. Direct-Current Resistivity Survey At Raft River Geothermal Area...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current Resistivity Survey At Raft River Geothermal Area...

  18. DC Resistivity Survey (Schlumberger Array) At Raft River Geothermal...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1974-1975) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: DC Resistivity Survey (Schlumberger Array) At Raft River...

  19. Development Wells At Raft River Geothermal Area (2004) | Open...

    Open Energy Info (EERE)

    Development Wells At Raft River Geothermal Area (2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Development Wells At Raft River Geothermal...

  20. Self Potential Measurements At Raft River Geothermal Area (1983...

    Open Energy Info (EERE)

    Measurements At Raft River Geothermal Area (1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Self Potential Measurements At Raft River...

  1. Audio-Magnetotellurics At Raft River Geothermal Area (1978) ...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1978) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Audio-Magnetotellurics At Raft River Geothermal Area (1978)...

  2. Earth Tidal Analysis At Raft River Geothermal Area (1984) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Earth Tidal Analysis At Raft River Geothermal Area (1984) Exploration Activity Details Location Raft River...

  3. Petrography Analysis At Raft River Geothermal Area (1980) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1980) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Petrography Analysis At Raft River Geothermal Area (1980)...

  4. Core Analysis At Raft River Geothermal Area (1979) | Open Energy...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Core Analysis At Raft River Geothermal Area (1979) Exploration...

  5. Geology and alteration of the Raft River geothermal system, Idaho...

    Open Energy Info (EERE)

    Raft River geothermal system, Idaho Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Proceedings: Geology and alteration of the Raft River geothermal...

  6. Airborne Electromagnetic Survey At Raft River Geothermal Area...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Airborne Electromagnetic Survey At Raft River Geothermal Area...

  7. Compound and Elemental Analysis At Raft River Geothermal Area...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1981) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Compound and Elemental Analysis At Raft River Geothermal Area...

  8. Isotopic Analysis-Fluid At Raft River Geothermal Area (1977)...

    Open Energy Info (EERE)

    GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Isotopic Analysis-Fluid At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  9. Earth Tidal Analysis At Raft River Geothermal Area (1982) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Earth Tidal Analysis At Raft River Geothermal Area (1982) Exploration Activity Details Location Raft River...

  10. Earth Tidal Analysis At Raft River Geothermal Area (1980) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Earth Tidal Analysis At Raft River Geothermal Area (1980) Exploration Activity Details Location Raft River...

  11. Chemical Logging At Raft River Geothermal Area (1979) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Chemical Logging At Raft River Geothermal Area (1979)...

  12. Acoustic Logs At Raft River Geothermal Area (1979) | Open Energy...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Acoustic Logs At Raft River Geothermal Area (1979) Exploration...

  13. Fault Mapping At Raft River Geothermal Area (1993) | Open Energy...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1993) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Fault Mapping At Raft River Geothermal Area (1993) Exploration...

  14. Hunan Rivers Bioengineering Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Rivers Bioengineering Co Ltd Jump to: navigation, search Name: Hunan Rivers Bioengineering Co Ltd Place: Yiyang, Hunan Province, China Zip: 413000 Product: The company uses waste...

  15. Savannah River Field Office | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Us Our Operations Management and Budget Office of Civil Rights Workforce Statistics Savannah River Field Office Savannah River Field Office FY15 Year End Report Semi...

  16. Vermont Watershed Management Rivers Program Website | Open Energy...

    Open Energy Info (EERE)

    Vermont Watershed Management Rivers Program Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Vermont Watershed Management Rivers Program Website...

  17. Lichuan City Yujiang River Valley Hydro Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Lichuan City Yujiang River Valley Hydro Co Ltd Jump to: navigation, search Name: Lichuan City Yujiang River Valley Hydro Co., Ltd. Place: Hubei Province, China Zip: 445400 Sector:...

  18. Lesson Learned by Savannah River Site Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Bonnie Barnes, Savannah River Remediation. Work Planning and Control at Savannah River Remediation.

  19. First Savannah River Shipment Arrives At WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    First Savannah River Site Shipment Arrives At WIPP CARLSBAD, N.M., May 10, 2001 - The U.S. Department of Energy's (DOE) Carlsbad Field Office today announced that the first shipment of defense-generated transuranic radioactive waste from DOE's Savannah River Site has arrived at the Waste Isolation Pilot Plant (WIPP). The shipment, which consisted of 42 drums of transuranic waste, left the Savannah River Site, near Aiken, South Carolina, at noon (EDT) on May 8, and arrived at WIPP today at 1:40

  20. Independent Oversight Inspection, Savannah River Site- December 2009

    Broader source: Energy.gov [DOE]

    Inspection of Reinforced Concrete Construction at the Savannah River Site Mixed Oxide Fuel Fabrication Facility

  1. Independent Oversight Inspection, Savannah River Site, Summary Report- February 2004

    Broader source: Energy.gov [DOE]

    Inspection of Environment, Safety, and Health Management and Emergency Management at the Savannah River Site

  2. Independent Oversight Review, Savannah River Site- September 2012

    Broader source: Energy.gov [DOE]

    Review of the Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping & Pipe Supports

  3. Enforcement Letter, Westinghouse Savannah River Company- July 21, 1998

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Notification of Incomplete Corrective Action

  4. Flambeau River Biofuels Demonstration-Scale Biorefinery | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Flambeau River Biofuels Demonstration-Scale Biorefinery Flambeau River Biofuels Demonstration-Scale Biorefinery The Flambeau River biorefinery will be added to an existing pulp and paper mill to create green diesel. PDF icon ibr_demonstration_flambeau.pdf More Documents & Publications NewPage Demonstration-Scale Biorefinery Flambeau_River_Biofuels.pdf Pacific Ethanol, Inc

  5. PIA - Savannah River Remediation Accreditation Boundary (SRR AB) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Remediation Accreditation Boundary (SRR AB) PIA - Savannah River Remediation Accreditation Boundary (SRR AB) PIA - Savannah River Remediation Accreditation Boundary (SRR AB) PDF icon PIA - Savannah River Remediation Accreditation Boundary (SRR AB) More Documents & Publications PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditation Boundary PIA - WEB Physical Security Major Application Occupational Medical Surveillance System (OMSS) PIA, Idaho

  6. EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) is preparing an EA to assess potential environmental impacts of a proposal to rebuild its 24-mile long, 115 kilovolt Bonneville-Hood River transmission line. The existing line runs between the Bonneville Powerhouse at Bonneville Dam in Multnomah County, Oregon, and BPA's existing Hood River Substation in Hood River County, Oregon. The project would include replacing structures and conductor wires, improving access roads, and constructing new access roads or trails where needed.

  7. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect (OSTI)

    CERTA PJ

    2008-07-10

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste management and treatment facilities, (8) Developing and implementing technical solutions to mitigate the impact from substantial1y increased estimates of Na added during the pretreatment of the tank waste solids, This involves a combination of: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, or (4) accepting an increase in mission duration, ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks, Key elements of the implementation of this strategy are included within the scope of the Tank Operations Contract, currently in procurement Since 2003, the ORP has conducted over 30 design oversight assessments of the Waste Treatment and Immobilization Plant (WTP). The estimated cost at completion has increased and the schedule for construction and commissioning of the WTP has extended, The DOE, Office of Environmental Management (EM), sanctioned a comprehensive review of the WTP flowsheet, focusing on throughput. In 2005, the TFC completed interim stabilization of the SSTs and as of March 2007, has completed the retrieval of seven selected SSTs. Demonstration of supplemental treatment technologies continues. The ongoing tank waste retrieval experience, progress with supplemental treatment technologies, and changes in WTP schedule led to the FY 2007 TFC baseline submittal in November 2006. The TFC baseline submittal was developed before the WTP schedule was fully understood and approved by ORP, and therefore reflects an earlier start date for the WTP facilities. This System Plan is aligned with the current WTP schedule with hot commissioning beginning in 2018 and full operations beginning in 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of

  8. EIS-0241: Hood River Fisheries Program

    Broader source: Energy.gov [DOE]

    This EIS evaluates a BPA proposal to protect and improve anadromous salmonid populations in the Hood River Basin. These actions are proposed in an attempt to mitigate the losses of fish and...

  9. Raft River Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    and later the US Department of Energy (DOE) which was formed by joining the Federal Energy Administration and ERDA in 1977.3 The Raft River site was identified as an area...

  10. South River EMC- Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    South River EMC offers a variety of rebates encouragings its members to invest in energy efficient appliances, equipment, and home upgrades. Incentives are available for a variety of energy...

  11. Lumbee River EMC- Residential Weatherization Loan Program

    Broader source: Energy.gov [DOE]

    Lumbee River Electric Membership Corporation (LREMC) offers low interest loans to help residential members increase the energy efficiency of homes. Loans up to $17,000 are available for the...

  12. BPA research aids Columbia River white sturgeon

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    research aids Columbia River white sturgeon 8142015 12:00 AM Tweet Page Content BPA fish biologist Scott Bettin (left) and Brad Cady of the Washington Dept. of Fish and...

  13. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Intake between August 4, 1996, and February 10, 1997, by a Crane Operator at the Savannah River Site F-Canyon Preliminary Notice of Violation, EG&G Incorporated - EA-97-10...

  14. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - EA 98-09 Type B Accident Investigation Board Report of the Plutonium Intake between August 4, 1996, and February 10, 1997, by a Crane Operator at the Savannah River Site F-Canyon...

  15. Clinch River MRS Task Force Recommendations

    Broader source: Energy.gov [DOE]

    The Clinch River HRS Task Force was appointed in July 1985 by the Roane County Executive and the Oak Ridge City Council to evaluate the Monitored Retrievable Storage (MRS) facility proposed by the...

  16. Domy C. Adriano | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Adriano Curriculum Vitae Faculty & Scientists SREL Home Domy C. Adriano Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5834 office (803) 725-3309 fax...

  17. Savannah River Site Environmental Report for 1997

    SciTech Connect (OSTI)

    Arnett, M.W.; Mamatey, A.R.

    1998-08-01

    The mission at the Savannah River Site has changed from the production of nuclear weapons materials for national defense to the management of waste, restoration of the environment, and the development of industry in and around the site.

  18. Robert A. Kennamer | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Curriculum Vitae Faculty & Scientists SREL Home Robert A. Kennamer Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-0387 office (803) 725-3309 fax...

  19. Stacey Lance | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lance Faculty & Scientists SREL Home Stacey Lance Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-0988 office (803) 725-3309 fax lance(at)srel.uga.edu...

  20. James Beasley | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Beasley Curriculum Vitae Faculty & Scientists SREL Home James Beasley Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5113 office (803) 725-3309 fax...

  1. Peter Stangel | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Senior Vice President, U.S. Endowment for Forestry and Communities co Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (404)-915-2763 (803) 725-8158...

  2. Tracey Tuberville | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Faculty & Scientists SREL Home SREL Herpetology Tracey D. Tuberville Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5757office (803) 725-3309 fax...

  3. David E. Scott | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scott Curriculum Vitae Faculty & Scientists SREL Home David E. Scott Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5747 office (803) 725-3309 fax...

  4. I. Lehr Brisbin | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Brisbin Faculty & Scientists SREL Home I. Lehr Brisbin Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5668 office (803) 725-3309 fax brisbin(at)uga.edu...

  5. Gary Mills | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mills Curriculum Vitae Faculty & Scientists SREL Home Gary Mills Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5368 office (803) 725-3309 fax...

  6. Doug Aubrey | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Aubrey Faculty & Scientists SREL Home Doug Aubrey Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-0135 office (803) 725-3309 fax daubrey(at)srel.uga.edu...

  7. Conference Center | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    small conference room Small conference room The University of Georgia - Savannah River Ecology Laboratory Conference Center is a 5,000-square-foot multi-purpose facility located on...

  8. John Seaman | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Seaman Curriculum Vitae Faculty & Scientists SREL Home John Seaman Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-0977 office (803) 725-3309 fax...

  9. River Data Package for the 2004 Composite Analysis

    SciTech Connect (OSTI)

    Rakowski, Cynthia L.; Guensch, Gregory R.; Patton, Gregory W.

    2004-08-01

    Beginning in fiscal year 2003, the DOE Richland Operations Office initiated activities, including the development of data packages, to support the 2004 Composite Analysis. The river data package provides calculations of flow and transport in the Columbia River system. This document presents the data assembled to run the river module components for the section of the Columbia River from Vernita Bridge to the confluence with the Yakima River.

  10. QER - Comment of Powder River Energy Corporation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Powder River Energy Corporation QER - Comment of Powder River Energy Corporation From: Mike Easley [mikee@precorp.coop] Sent: Wednesday, August 20, 2014 11:59 PM To: QERcomments Subject: Comment on the QER Public Meeting in Cheyenne, WY: Infrastructure Siting Attachment: Michael Easley CEO Powder River Energy Corporation - Statement.pdf Statement of Michael E Easley Panel 1-Electric Infrastructure Siting Best Regards, Mike Michael Easley CEO Powder River Energy Corporation Powder River Energy,

  11. Office of River Protection's (ORP) Path to Reinvigorating Technology

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Development | Department of Energy River Protection's (ORP) Path to Reinvigorating Technology Development Office of River Protection's (ORP) Path to Reinvigorating Technology Development Presentation from the 2015 DOE National Cleanup Workshop by Kevin Smith, Manager, Office of River Protection. PDF icon ORP's Path to Reinvigorating Technology Development More Documents & Publications Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering

  12. EA-366 TWIN RIVERS PAPER CO INC. | Department of Energy

    Energy Savers [EERE]

    6 TWIN RIVERS PAPER CO INC. EA-366 TWIN RIVERS PAPER CO INC. Order authorizing Twin Rivers Paper Co to export electric energy to Canada. PDF icon EA-366 Twin Rivers CN.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-366 Twin Rivers Paper Company Inc EA-264-C ENMAX Energy Marketing Inc. EA-385 Dynasty Power Inc.

  13. PP-366 Twin Rivers Paper Company, Inc. | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Twin Rivers Paper Company, Inc. PP-366 Twin Rivers Paper Company, Inc. Presidential Permit authorizing Twin Rivers Paper Company, Inc. to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PDF icon PP-366 Twin Rivers Paper Company, Inc. More Documents & Publications Application for Presidential Permit OE Docket No. PP-366 Twin Rivers Paper Company, Inc. Record of Categorical Exclusion (CS) Determination, Office of Electricity Delivery and Energy

  14. Voluntary Protection Program Onsite Review, Savannah River Remediation,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Llc, Liquid Waste Contract, Savannah River Site - November 2014 | Department of Energy Savannah River Remediation, Llc, Liquid Waste Contract, Savannah River Site - November 2014 Voluntary Protection Program Onsite Review, Savannah River Remediation, Llc, Liquid Waste Contract, Savannah River Site - November 2014 November 2014 Recertification of SRR as a Star Participant in the Department of Energy Voluntary Protection Program. This report summarizes the results from the evaluation of

  15. Washington Closure Hanford: Ten Years of River Corridor Cleanup |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Washington Closure Hanford: Ten Years of River Corridor Cleanup Washington Closure Hanford: Ten Years of River Corridor Cleanup December 17, 2015 - 12:30pm Addthis Contract-Timeline-E1511010_4-B_756px.jpg This timeline shows contractor Washington Closure Hanford's accomplishments over the past 10 years through its River Corridor Closure Contract. Addthis Related Articles EM Update Newsletter Spotlights River Corridor Cleanup at Hanford Site River Corridor Achievements

  16. PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Procurement Cycle System (PCS) PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS) PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS) PDF icon PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS) More Documents & Publications PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety

  17. PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Boundary | Department of Energy IBARS Srs Site Apps. Accreditation Boundary PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditation Boundary PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditation Boundary PDF icon PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditation Boundary More Documents & Publications PIA - Savannah River Nuclear Solutions Badge Request and Site Personnel Roster Systems PIA - Savannah River Remediation

  18. PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System (HRMS) | Department of Energy (SRNS) Human Resource Management System (HRMS) PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) PDF icon PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) More Documents & Publications PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS) PIA - Savannah River Site

  19. Independent Activity Report, Savannah River Remediation - July 2010 |

    Office of Environmental Management (EM)

    Department of Energy Savannah River Remediation - July 2010 Independent Activity Report, Savannah River Remediation - July 2010 July 2010 Savannah River Operations Office Integrated Safety Management System Phase II Verification Review of Savannah River Remediation The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the DOE Savannah River Operations Office (DOE-SR), Office of Safety and Quality

  20. 2013 Annual Planning Summary for the Savannah River Operations Office |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Savannah River Operations Office 2013 Annual Planning Summary for the Savannah River Operations Office The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Savannah River Operations Office. PDF icon NNSA_SROO_NEPA-APS-2013.pdf More Documents & Publications 2012 Annual Planning Summary for Savannah River Operations Office 2010 Annual Planning Summary for Savannah River Operations Office (SRS) 2012 Annual

  1. Columbia River Component Data Gap Analysis

    SciTech Connect (OSTI)

    L. C. Hulstrom

    2007-10-23

    This Data Gap Analysis report documents the results of a study conducted by Washington Closure Hanford (WCH) to compile and reivew the currently available surface water and sediment data for the Columbia River near and downstream of the Hanford Site. This Data Gap Analysis study was conducted to review the adequacy of the existing surface water and sediment data set from the Columbia River, with specific reference to the use of the data in future site characterization and screening level risk assessments.

  2. Justin D. Congdon | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Congdon Curriculum Vitae Faculty & Scientists SREL Home SREL Herpetology Justin D. Congdon Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5341 office (803) 725-3309 fax congdon(at)srel.uga.edu Justin Congdon is a Professor Emeritus at University of Georgia. For many years preceeding 2002 he was a senior research scientist at the Savannah River Ecology Laboratory and still participates in many of the studies being conducted at SREL. Justin earned an associate's

  3. Infrastructure at the Savannah River Site:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Infrastructure at the Savannah River Site: Modernizing for 21 st Century Missions January 2011 Executive Summary As it has for more than 60 years, the Savannah River Site (SRS) remains one of the crown jewels in America's quest for national security, innovative technology and new energy sources. SRS is well-suited to continue to perform nuclear-related missions with every assurance of quality, safety and innovation. SRS is not a closure site. It has clearly defined future missions extending

  4. Indian River Hydroelectric Project Grant

    SciTech Connect (OSTI)

    Rebecca Garrett

    2005-04-29

    This Final Technical Report provides a concise retrospective and summary of all facets of the Sheldon Jackson College electrical Infrastructure Renovation portion of the Indian River Hydroelectric Project Grant of the City and Borough of Sitka, Alaska. The Project Overview describes the origins of the project, the original conditions that provided the impetus for the grant funding, how the grant amendment was developed, the conceptual design development, and the actual parameters of the final project as it went out to bid. The Project Overview also describes the ''before and after'' conditions of the project. The Objectives division of this Final Technical Report describes the amendment-funded goals of the project. It also describes the milestones of project development and implementation, as well as, the rationale behind the milestone array. The Description of Activities Performed division of this report provides an in-depth chronological analysis of progressive project implementation. Photographs will provide further illustration of particular functional aspects of the renovation project within project parameters. The Conclusions and Recommendations division of this report provides a comprehensive retrospective analysis of the project.

  5. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect (OSTI)

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and Waste Management Environmental Impact Statement is completed and a Record of Decision is issued by DOE. Technical solutions are being developed to mitigate the impact from substantially increased estimates of sodium to be added during pretreatment of the tank waste solids. This may involve one or more of the following options: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, (4) increasing the incorporation of aluminum in the HLW glass to reduce caustic leaching requirements, or (5) implementing other technical solutions. For planning purposes, the PMB assumes that option (5) above, in the form of an ARF, will be successful in reducing the sodium required to be added during pretreatment of the tank waste.

  6. Coho Salmon Master Plan, Clearwater River Basin.

    SciTech Connect (OSTI)

    Nez Perce Tribe; FishPro

    2004-10-01

    The Nez Perce Tribe has a desire and a goal to reintroduce and restore coho salmon to the Clearwater River Subbasin at levels of abundance and productivity sufficient to support sustainable runs and annual harvest. Consistent with the Clearwater Subbasin Plan (EcoVista 2003), the Nez Perce Tribe envisions developing an annual escapement of 14,000 coho salmon to the Clearwater River Subbasin. In 1994, the Nez Perce Tribe began coho reintroduction by securing eggs through U.S. v. Oregon; by 1998 this agreement provided an annual transfer of 550,000 coho salmon smolts from lower Columbia River hatchery facilities for release in the Clearwater River Subbasin. In 1998, the Northwest Power and Conservation Council authorized the Bonneville Power Administration to fund the development of a Master Plan to guide this reintroduction effort. This Master Plan describes the results of experimental releases of coho salmon in the Clearwater River Subbasin, which have been ongoing since 1995. These data are combined with results of recent coho reintroduction efforts by the Yakama Nation, general coho life history information, and historical information regarding the distribution and life history of Snake River coho salmon. This information is used to assess a number of alternative strategies aimed at restoring coho salmon to historical habitats in the Clearwater River subbasin. These data suggest that there is a high probability that coho salmon can be restored to the Clearwater River subbasin. In addition, the data also suggest that the re-establishment of coho salmon could be substantially aided by: (1) the construction of low-tech acclimation facilities; (2) the establishment of a 'localized' stock of coho salmon; and (3) the construction of hatchery facilities to provide a source of juvenile coho salmon for future supplementation activities. The Nez Perce Tribe recognizes that there are factors which may limit the success of coho reintroduction. As a result of these uncertainties, the Nez Perce Tribe proposes to utilize a phased approach for coho reintroductions. This Master Plan seeks authorization and funding to move forward to Step 2 in the Northwest Power and Conservation Council 3-Step review process to further evaluate Phase I of the coho reintroduction program, which would focus on the establishment of a localized coho salmon stock capable of enduring the migration to the Clearwater River subbasin. To achieve this goal, the Nez Perce Tribe proposes to utilize space at existing Clearwater River subbasin hatchery facilities in concert with the construction of two low-tech acclimation facilities, to capitalize on the higher survival observed for acclimated versus direct stream released coho. In addition, Phase I would document the natural productivity of localized coho salmon released in two targeted tributaries within the Clearwater River subbasin. If Phase I is successful at establishing a localized coho salmon stock in an abundance capable of filling existing hatchery space, the rates of natural productivity are promising, and the interspecific interactions between coho and sympatric resident and anadromous salmonids are deemed acceptable, then Phase II would be triggered. Phase II of the coho reintroduction plan would focus on establishing natural production in a number of Clearwater River subbasin tributaries. To accomplish this goal, Phase II would utilize existing Clearwater River subbasin hatchery facilities, and expand facilities at the Nez Perce Tribal Hatchery Site 1705 facility to rear approximately 687,700 smolts annually for use in a rotating supplementation schedule. In short, this document identifies a proposed alternative (Phase I), complete with estimates of capital, operations and maintenance, monitoring and evaluation, and permitting that is anticipated to raise average smolt replacement rates from 0.73 (current) to 1.14 using primarily existing facilities, with a limited capital investment for low-tech acclimation facilities. This increase in survival is expected to provide the opportunity for the establishm

  7. EIS-0422: Notice of Intent to Prepare an Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration Central-Ferry Lower Monumental Transmission Line Project in Garfield, Columbia, and Walla Walla Counties in Washington

  8. EIS-0265-SA-67: Supplement Analysis

    Broader source: Energy.gov [DOE]

    Watershed Management Program - Install Fish Screens to Protect ESA Listed Steelhead and Bull Trout in the Walla Walla Basin

  9. New River Geothermal Exploration (Ram Power Inc.)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Miller, Clay

    2013-11-15

    The New River Geothermal Exploration (DOE Award No. EE0002843) is located approximately 25km south of the Salton Sea, near town of Brawley in Imperial County and approximately 150km east of San Diego, California. A total of 182 MT Logger sites were completed covering the two separate Mesquite and New River grids. The data was collected over a frequency range of 320Hz to 0.001Hz with variable site spacing. A number of different inversion algorithms in 1D, 2D and 3D were used to produce resistivity-depth profiles and maps of subsurface resistivity variations over the survey area. For 2D inversions, a total of eighteen lines were constructed in east-west and north-south orientations crossing the entire survey area. For MT 3D inversion, the New River property was divided in two sub-grids, Mesquite and New River areas. The report comprises of two parts. For the first part, inversions and geophysical interpretation results are presented with some recommendations of the potential targets for future follow up on the property. The second part of the report describes logistics of the survey, survey parameters, methodology and the survey results (data) in digital documents. The report reviews a Spartan MT survey carried out by Quantec Geoscience Limited over the New River Project in California, USA on behalf of Ram Power Inc. Data was acquired over a period of 29 days from 2010/06/26 to 2010/07/24.

  10. Savannah River Site (SRS) environmental overview

    SciTech Connect (OSTI)

    O'Rear, M.G. ); Steele, J.L.; Kitchen, B.G. )

    1990-01-01

    The environmental surveillance activities at and in the vicinity of the Savannah River Site (SRS) (formerly the Savannah River Plant (SRP)) comprise one of the most comprehensive and extensive environmental monitoring programs in the United States. This overview contains monitoring data from routine and nonroutine radiological and nonradiological environmental surveillance activities, summaries of environmental protection programs in progress, a summary of National Environmental Policy Act (NEPA) activities, and a listing of environmental permits (Appendix A) issued by regulatory agencies. This overview provides information about the impact of SRS operations on the public and the environment. The SRS occupies a large area of approximately 300 square miles along the Savannah River, principally in Aiken and Barnwell counties of South Carolina. SRS's primary function is the production of tritium, plutonium, and other special nuclear materials for national defense, for other governmental uses, and for some civilian purposes. From August 1950 to March 31, 1989, SRS was operated for the Department of Energy (DOE) by E. I. du Pont de Nemours Co. On April 1, 1989 the Westinghouse Savannah River Company assumed responsibility as the prime contractor for the Savannah River Site.

  11. New River Geothermal Exploration (Ram Power Inc.)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Miller, Clay

    The New River Geothermal Exploration (DOE Award No. EE0002843) is located approximately 25km south of the Salton Sea, near town of Brawley in Imperial County and approximately 150km east of San Diego, California. A total of 182 MT Logger sites were completed covering the two separate Mesquite and New River grids. The data was collected over a frequency range of 320Hz to 0.001Hz with variable site spacing. A number of different inversion algorithms in 1D, 2D and 3D were used to produce resistivity-depth profiles and maps of subsurface resistivity variations over the survey area. For 2D inversions, a total of eighteen lines were constructed in east-west and north-south orientations crossing the entire survey area. For MT 3D inversion, the New River property was divided in two sub-grids, Mesquite and New River areas. The report comprises of two parts. For the first part, inversions and geophysical interpretation results are presented with some recommendations of the potential targets for future follow up on the property. The second part of the report describes logistics of the survey, survey parameters, methodology and the survey results (data) in digital documents. The report reviews a Spartan MT survey carried out by Quantec Geoscience Limited over the New River Project in California, USA on behalf of Ram Power Inc. Data was acquired over a period of 29 days from 2010/06/26 to 2010/07/24.

  12. Overview | Savannah River National Environmental Park

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Park Overview The Savannah River Site is an 803-km2 Department of Energy (DOE) facility located on the Upper Coastal Plain of South Carolina, near Aiken, SC. The site is bordered on one side by the Savannah River. Approximately 10% of the site is developed for DOE industrial activities; the remaining 720 km2 is primarily forested. The entire SRS became the nation's first National Environmental Research Park (NERP) in 1972. Within the SRS NERP, DOE also maintains a network of research reserves

  13. Kimberly Andrews | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Andrews with kingsnake Curriculum Vitae Faculty & Scientists SREL Home SREL Herpetology Kimberly Andrews Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-9793 office (803) 725-3309 fax andrews(at)srel.uga.edu Kimberly received her PhD in Ecology (2010) from the University of Georgia’s Odum School of Ecology through work at the Savannah River Ecology Laboratory (UGA SREL) under the advisement of Dr. Whit Gibbons. Kimberly also holds an M.S. in Conservation Ecology

  14. Mirant Potomac River, LLC, Monthly Model Evaluation Study Report...

    Energy Savers [EERE]

    January 2007 Mirant Potomac River, LLC, Monthly Model Evaluation Study Report, January 2007 Docket No. EO-05-01. Order No. 202-07-02: As you are aware, Mirant Potomac River, L.L.C,...

  15. Mirant Potomac River, LLC, Monthly Model Evaluation Study Report...

    Energy Savers [EERE]

    March 2007 Mirant Potomac River, LLC, Monthly Model Evaluation Study Report, March 2007 Docket No. EO-05-01. Order No. 202-07-02: As you are aware, Mirant Potomac River, L.L.C,...

  16. Mirant Potomac River, LLC, Monthly Model Evaluation Study Report...

    Office of Environmental Management (EM)

    February 2007 Mirant Potomac River, LLC, Monthly Model Evaluation Study Report, February 2007 Docket No. EO-05-01. Order No. 202-07-02: As you are aware, Mirant Potomac River,...

  17. Peace River Electric Coop, Inc | Open Energy Information

    Open Energy Info (EERE)

    Peace River Electric Coop, Inc Jump to: navigation, search Name: Peace River Electric Coop, Inc Place: Florida Phone Number: 1-877-282-3656 Website: www.preco.coop Outage Hotline:...

  18. Savannah River Site Manager Jack Craig Wins Highest Civil Service...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Site Manager Jack Craig Wins Highest Civil Service Award Savannah River Site Manager Jack Craig Wins Highest Civil Service Award December 29, 2015 - 1:00pm Addthis ...

  19. Savannah River Ecology Laboratory FY2006 Annual Technical Progress Report

    SciTech Connect (OSTI)

    Paul M. Bertsch

    2006-10-23

    FY2006 annual report of research conducted by the Savannah River Ecology Laboratory, a research unit of the University of Georgia operating on the Savannah River Site in Aiken, County, SC.

  20. Salt River Electric Coop Corp | Open Energy Information

    Open Energy Info (EERE)

    River Electric Coop Corp Jump to: navigation, search Name: Salt River Electric Coop Corp Place: Kentucky References: EIA Form EIA-861 Final Data File for 2010 - File1a1 EIA Form...

  1. SAVANNAH RIVER TECHNOLOGY CENTER MONTHLY REPORT AUGUST 1992

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1999-06-21

    'This monthly report summarizes Programs and Accomplishments of the Savannah River Technology Center in support of activities at the Savannah River Site. The following categories are addressed: Reactor, Tritium, Separations, Environmental, Waste Management, General, and Items of Interest.'

  2. Savannah River Site's Liquid Waste Operations Adds Multi-Functional...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Budget at Savannah River Site DOE Issues RFI and Industry Day Announcement on Optimal Design of Saltstone Disposal Units at the Savannah River Site Pictured here is a component...

  3. Exhibit D: Mirant Potomac River Schedule of Unit Operations:...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4, January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 4, January - March 2006 Docket No. EO-05-01: Exhibit D: Mirant Potomac River...

  4. Exhibit D: Mirant Potomac River Schedule of Unit Operations:...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: January - March 2006 Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit...

  5. CRAD, Engineering - Office of River Protection K Basin Sludge...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Engineering - Office of River Protection K Basin Sludge Waste System CRAD, Engineering - Office of River Protection K Basin Sludge Waste System May 2004 A section of Appendix C to ...

  6. Black River Farm Solar Project | Open Energy Information

    Open Energy Info (EERE)

    Solar Project Facility Black River Farm Solar Project Sector Solar Facility Type Fixed Tilt Ground-Mount & Roof-Mount Owner EnXco Developer EnXco Energy Purchaser Black River Farm...

  7. Millions of Columbia River salmon return home in 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wind River. BPA funded a habitat restoration project on the river and helped bring fish back. A few years ago, there were no salmon in the Little Wind, this fall hundreds...

  8. City of Wood River, Nebraska (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    City of Wood River, Nebraska (Utility Company) Jump to: navigation, search Name: Wood River Municipal Power Place: Nebraska Phone Number: 308.583-2515; 308-583-2066 Website:...

  9. Paul Mutolo talks about Honorable Transportation - TEDxChemungRiver...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Paul Mutolo talks about Honorable Transportation - TEDxChemungRiver January 4th, 2016 Dr. Paul Mutolo spoke at TEDxChemungRiver 2015 in Corning, New York back in November. To...

  10. South River Elec Member Corp | Open Energy Information

    Open Energy Info (EERE)

    River Elec Member Corp Jump to: navigation, search Name: South River Elec Member Corp Place: North Carolina Phone Number: (910) 892-8071 Website: www.sremc.com Twitter: https:...

  11. Sun River Electric Coop, Inc | Open Energy Information

    Open Energy Info (EERE)

    River Electric Coop, Inc Jump to: navigation, search Name: Sun River Electric Coop, Inc Place: Montana Phone Number: 1-406-467-2526 Website: www.sunriverelectric.coop Outage...

  12. City of Park River, North Dakota (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Park River, North Dakota (Utility Company) Jump to: navigation, search Name: City of Park River Place: North Dakota Phone Number: 701.284.6150 Website: www.parkrivernd.govoffice2.c...

  13. Direct-Current Resistivity Survey At Raft River Geothermal Area...

    Open Energy Info (EERE)

    surveys were undertaken at the Raft River geothermal area. References Zohdy, A.A.R.; Jackson, D.B.; Bisdorf, R.J. (12 October 1975) Exploring the Raft River geothermal area,...

  14. Red River Valley Coop Pwr Assn | Open Energy Information

    Open Energy Info (EERE)

    Red River Valley Coop Pwr Assn Jump to: navigation, search Name: Red River Valley Coop Pwr Assn Place: Minnesota Website: www.rrvcoop.com Facebook: https:www.facebook.comRRVCPA...

  15. BLM Four Rivers Field Office | Open Energy Information

    Open Energy Info (EERE)

    Four Rivers Field Office Jump to: navigation, search Name: BLM Four Rivers Field Office Address: 3948 Development Ave. Place: Boise, ID Zip: 83705 Phone Number: 208-384-3300...

  16. Title 10 Chapter 45 Connecticut River Flood Control Compact ...

    Open Energy Info (EERE)

    5 Connecticut River Flood Control Compact Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 10 Chapter 45 Connecticut River...

  17. Savannah River Ecology Laboratory 2005 Annual Technical Progress Report

    SciTech Connect (OSTI)

    Paul M. Bertsch

    2005-07-19

    2005 annual report of research conducted by the Savannah River Ecology Laboratory, a research unit of The University of Georgia operating on the Savannah River Site, Aiken, South Carolina

  18. Texas River Authority Website Links | Open Energy Information

    Open Energy Info (EERE)

    Legal Document- OtherOther: Texas River Authority Website LinksLegal Abstract The Texas Parks and Wildlife Department provides information on and links to each of the 23 river...

  19. Indian River County, Florida: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    is classified as ASHRAE 169-2006 Climate Zone Number 2 Climate Zone Subtype A. Registered Energy Companies in Indian River County, Florida Climatic Solar Places in Indian River...

  20. Preliminary Notice of Violation, Savannah River Nuclear Solutions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Savannah River Nuclear Solutions (SRNS), LLC, related to a Worker Fall from a Scaffold in the K-Area Complex at the Savannah River Site On November 9, 2012, the U.S....

  1. U. S. Department of Energy Savannah River Operations Office ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    River Operations Office Mission Welcome to the Savannah River Operations Office (DOE-SR) website. DOE-SR is a U.S. Department of Energy (DOE) organization that serves as the...

  2. U. S. Department of Energy Savannah River Operations Office ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Savannah River Site Liquid Waste System Plans Archive Savannah River Site Liquid Waste System Plans Archive SRR-LWP-2009-00001 R-18 (June 2013) Adobe Acrobat PDF SRR-LWP-2009-00001...

  3. Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity

    Broader source: Energy.gov [DOE]

    College intern Spencer Isom recently began her second summer with Savannah River Remediation (SRR), and her fourth year at Savannah River Site (SRS), where she continues a 31-year family legacy on site.

  4. Deep drilling data Raft River geothermal area, Idaho | Open Energy...

    Open Energy Info (EERE)

    data Raft River geothermal area, Idaho Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Deep drilling data Raft River geothermal area, Idaho Abstract...

  5. Subsurface geology of the Raft River geothermal area, Idaho ...

    Open Energy Info (EERE)

    geology of the Raft River geothermal area, Idaho Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Proceedings: Subsurface geology of the Raft River...

  6. Savannah River Site Museum Ribbon Cutting | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Site Museum Ribbon Cutting Savannah River Site Museum Ribbon Cutting Addthis Description A ribbon cutting ceremony marked the opening of the new SRS Museum, on October 27, 2014, at the former Dibble Library in Aiken, South Carolina.

  7. Savannah River Field Office | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    About Us / Our Operations / Management and Budget / Office of Civil Rights / Workforce Statistics / Savannah River Field Office Savannah River Field Office FY15 Year End Report Semi Annual Report FY14 Year End Report Semi Annual Report

  8. Preliminary Notice of Violation, Westinghouse Savannah River Company- EA-2000-02

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company, related to Procurement Quality Assurance and Quality Improvement Deficiencies at the Savannah River Site.

  9. Workplace Charging Challenge Partner: Salt River Project | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Salt River Project Workplace Charging Challenge Partner: Salt River Project Workplace Charging Challenge Partner: Salt River Project The mission of Salt River Project's (SRP) Electric Vehicle Initiative is to encourage greater use of clean energy transportation. Under this program, SRP's headquarters received two Level 2 charging stations in 2010. When demand for workplace charging increased in 2012, SRP added eight Level 2 and five Level 1 charging stations for employee use.

  10. Independent Oversight Review, Savannah River Site- August 2011

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Commercial Grade Dedication Plans for the Safety Instrumented System at the Savannah River Site Waste Solidification Building Project

  11. Savannah River Site - Central Shops GW OU | Department of Energy

    Office of Environmental Management (EM)

    Central Shops GW OU Savannah River Site - Central Shops GW OU January 1, 2013 - 12:00pm Addthis US Department of Energy Groundwater Database Groundwater Master Report InstallationName, State: Savannah River Site, SC Responsible DOE Office: Savannah River Site Plume Name: Central Shops GW OU Remediation Contractor: Savannah River Nuclear Solutions, LLC PBS Number: 30 Report Last Updated: 2013 Contaminants Halogenated VOCs/SVOCs Present?: Yes VOC Name Concentration (ppb) Regulatory Driver Cleanup

  12. Independent Oversight Activity Report, Savannah River Site - February

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014 | Department of Energy Savannah River Site - February 2014 Independent Oversight Activity Report, Savannah River Site - February 2014 February 2014 Operational Awareness Visit of the Savannah River Site [HIAR-SRS-2014-02-25] This Independent Activity Report documents an oversight activity conducted by the Office of Health, Safety and Security's (HSS) Office of Safety and Emergency Management Evaluations on February 25-27, 2014, at the Savannah River Site (SRS). The activity consisted of

  13. Independent Oversight Review, Savannah River Operations Office - July 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Independent Oversight Review, Savannah River Operations Office - July 2013 Independent Oversight Review, Savannah River Operations Office - July 2013 July 2013 Review of the Employee Concerns Program at the Savannah River Operations Office The purpose of this Independent Oversight targeted review was to evaluate DOE-SR processes and their implementation for addressing safety concerns reported by DOE, contractor, and subcontractor employees at the Savannah River Site

  14. PP-41 Mirias River Electric Cooperative, Inc. | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Mirias River Electric Cooperative, Inc. PP-41 Mirias River Electric Cooperative, Inc. Presidential Permit authorizing Mirias River Electric Cooperative, Inc. to constuct, operate, and maintain electric transmission facilities at the U.S.- Canada Border. PDF icon PP-41 Mirias River Electric Cooperative, Inc. More Documents & Publications PP-42 Roseau Electric Cooperative, Inc. PP-67 North Central Electric Cooperative, Inc. PP-69 Vermont

  15. Small Column Ion Exchange at Savannah River Site Technology Readiness

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment Report | Department of Energy Small Column Ion Exchange at Savannah River Site Technology Readiness Assessment Report Small Column Ion Exchange at Savannah River Site Technology Readiness Assessment Report PDF icon Small Column Ion Exchange at Savannah River Site Technology Readiness Assessment Report More Documents & Publications Small Column Ion Exchange Technology at Savannah River Site Compilation of TRA Summaries External Technical Review Report for Small Column Ion

  16. Independent Oversight Review, Savannah River Site- July 2011

    Broader source: Energy.gov [DOE]

    Review of Electrical System Configuration Management and Design Change Control at the Savannah River Site, Waste Solidification Building Project

  17. Contractor Fee Payments - Office of River Protection | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of River Protection Contractor Fee Payments - Office of River Protection See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Office of River Protection on these charts. PDF icon Laboratory Analytical Services & Testing PDF icon Tank Operations PDF icon Waste Treatment Plant Design & Construction More Documents & Publications Contractor Fee Payments - Savannah River Operations Office Contractor Fee Payments -

  18. Voluntary Protection Program Onsite Review, Washington River Protection

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solutions, LLC, Hanford - Feb 2014 | Department of Energy Washington River Protection Solutions, LLC, Hanford - Feb 2014 Voluntary Protection Program Onsite Review, Washington River Protection Solutions, LLC, Hanford - Feb 2014 February 13, 2014 Evaluation to determine whether Washington River Protection Solutions, LLC, Hanford is performing at a level deserving DOE-VPP Star recognition. PDF icon Voluntary Protection Program Onsite Review, Washington River Protection Solutions, LLC, Hanford

  19. Disposal Practices at the Savannah River Site | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Practices at the Savannah River Site Disposal Practices at the Savannah River Site Full Document and Summary Versions are available for download PDF icon Disposal Practices at the Savannah River Site PDF icon Summary - Disposal Practices at the Savannah River Site More Documents & Publications Compilation of ETR Summaries Disposal Practices at the Nevada Test Site 2008 Briefing: DOE EM ITR Landfill Assessment Project Lessons Learned

  20. PIA - Savannah River Site Management and Operating Contractor...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) Integrated Safety Management Workshop Registration, PIA,...

  1. Categorical Exclusion Determinations: Office of River Protection-Richland

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Opperations Office | Department of Energy River Protection-Richland Opperations Office Categorical Exclusion Determinations: Office of River Protection-Richland Opperations Office Categorical Exclusion Determinations issued by Office of River Protection-Richland Office. DOCUMENTS AVAILABLE FOR DOWNLOAD July 29, 2014 CX-012727: Categorical Exclusion Determination CHPRC Cleanup Actions CX(s) Applied: B6.1 Date: 41849 Location(s): Washington Offices(s): River Protection-Richland Operations

  2. 2012 Annual Planning Summary for Savannah River Operations Office

    Office of Energy Efficiency and Renewable Energy (EERE)

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Savannah River Operations Office.

  3. Modeling-Computer Simulations At Raft River Geothermal Area ...

    Open Energy Info (EERE)

    navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Modeling-Computer Simulations At Raft River Geothermal Area (1980) Exploration Activity Details...

  4. Modeling-Computer Simulations At Raft River Geothermal Area ...

    Open Energy Info (EERE)

    navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Modeling-Computer Simulations At Raft River Geothermal Area (1979) Exploration Activity Details...

  5. Modeling-Computer Simulations At Raft River Geothermal Area ...

    Open Energy Info (EERE)

    navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Modeling-Computer Simulations At Raft River Geothermal Area (1977) Exploration Activity Details...

  6. Modeling-Computer Simulations At Raft River Geothermal Area ...

    Open Energy Info (EERE)

    navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Modeling-Computer Simulations At Raft River Geothermal Area (1983) Exploration Activity Details...

  7. Savannah River Site - Salt Waste Processing Facility Independent Technical

    Energy Savers [EERE]

    Review | Department of Energy Facility Independent Technical Review Savannah River Site - Salt Waste Processing Facility Independent Technical Review Full Document and Summary Versions are available for download PDF icon Savannah River Site - Salt Waste Processing Facility Independent Technical Review PDF icon Summary - Salt Waste Processing Facility Design at the Savannah River Site More Documents & Publications Savannah River Site - Salt Waste Processing Facility: Briefing on the Salt

  8. Project Management Institute Highlights Savannah River Nuclear Solutions in

    Energy Savers [EERE]

    Publication | Department of Energy Project Management Institute Highlights Savannah River Nuclear Solutions in Publication Project Management Institute Highlights Savannah River Nuclear Solutions in Publication February 6, 2014 - 12:00pm Addthis American Recovery and Reinvestment Act workers at the Savannah River Site imploded the 455-foot-tall K Reactor Cooling Tower in May 2010. American Recovery and Reinvestment Act workers at the Savannah River Site imploded the 455-foot-tall K Reactor

  9. Raft River III Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Raft River III Geothermal Project Project Location Information Coordinates...

  10. PIA - DOE Savannah River Operations Office PRISM System | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Savannah River Operations Office PRISM System PIA - DOE Savannah River Operations Office PRISM System PIA - DOE Savannah River Operations Office PRISM System PDF icon PIA - DOE Savannah River Operations Office PRISM System More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Bonneville Power Adminstration Ethics Helpline PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009

  11. PIA - Savannah River Nuclear Solution SRNS Electronic Document Workflow

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RECORDS System (EDWS) | Department of Energy SRNS Electronic Document Workflow RECORDS System (EDWS) PIA - Savannah River Nuclear Solution SRNS Electronic Document Workflow RECORDS System (EDWS) PIA - Savannah River Nuclear Solution SRNS Electronic Document Workflow RECORDS System (EDWS) PDF icon PIA - Savannah River Nuclear Solution SRNS Electronic Document Workflow RECORDS System (EDWS) More Documents & Publications PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System

  12. PIA - Savannah River Operations Office Lotus Domino/Notes System |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Lotus Domino/Notes System PIA - Savannah River Operations Office Lotus Domino/Notes System PIA - Savannah River Operations Office Lotus Domino/Notes System PDF icon PIA - Savannah River Operations Office Lotus Domino/Notes System More Documents & Publications PIA - DOE Savannah River Operations Office PRISM System PIA - GovTrip (DOE data) PIA - HSPD-12 Physical and Logical Access System

  13. PIA - Savannah River Site Management and Operating Contractor (HRMS) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) PDF icon PIA - Savannah River Site Management and Operating Contractor (HRMS) More Documents & Publications PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA -

  14. Independent Oversight Activity Report, Office of River Protection - May

    Office of Environmental Management (EM)

    2013 | Department of Energy Office of River Protection - May 2013 Independent Oversight Activity Report, Office of River Protection - May 2013 May 2013 Operational Awareness Visit at the Office of River Protection [HAIR-HANFORD-2013-05-13] The Office of Health, Safety and Security (HSS) Office of Safety and Emergency Management Evaluations (HS-45) Site Lead conducted an operational awareness visit to the Office of River Protection (ORP) to observe contractor efforts to develop a hazards

  15. Independent Oversight Follow-up Review, Savannah River National Laboratory

    Office of Environmental Management (EM)

    - January 2012 | Department of Energy Savannah River National Laboratory - January 2012 Independent Oversight Follow-up Review, Savannah River National Laboratory - January 2012 January 2012 Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site This report provides the results of an independent review of the identification and implementation of safety basis hazard controls associated with "flashing spray release"

  16. Independent Oversight Inspection, Savannah River Site - January 2010 |

    Office of Environmental Management (EM)

    Department of Energy Savannah River Site - January 2010 Independent Oversight Inspection, Savannah River Site - January 2010 January 2010 Inspection of Emergency Management at the Savannah River Site This report provides the results of an independent oversight inspection of emergency management at the Department of Energy's (DOE) Savannah River Site. The inspection was conducted in August and September 2009 by the Office of Independent Oversight's Office of Emergency Management Oversight,

  17. White River Valley Electric Cooperative- Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    The White River Electric Coop's Rebate Program offers both residential and commercial rebates. Items available in the program include:

  18. Tapping the Power of Alaska's Rivers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tapping the Power of Alaska's Rivers Tapping the Power of Alaska's Rivers April 10, 2013 - 2:06pm Addthis Partnering with Alaska's Whitestone Power, EERE is supporting efforts to develop a practical River In-Stream Energy Conversion (RISEC)-a device that can produce electricity from free-flowing rivers not suited to conventional hydroelectric generation, and that can do so in Alaska's weather conditions. Rural areas of Alaska frequently experience high electricity prices due to the high costs of

  19. Deep Challenges for Foundation Performance at Savannah River Site |

    Office of Environmental Management (EM)

    Department of Energy Deep Challenges for Foundation Performance at Savannah River Site Deep Challenges for Foundation Performance at Savannah River Site Deep Challenges for Foundation Performance at Savannah River Site Frank H. Syms and Brent Gutierrez October 22, 2014 PDF icon Deep Challenges for Foundation Performance at Savannah River Site More Documents & Publications H-Tank Farm Waste Determination SRS FTF Section 3116 Basis for Determination F-Tank Farm Performance Assessment, Rev

  20. EA-1973: Kootenai River Restoration at Bonners Ferry, Boundary County,

    Office of Environmental Management (EM)

    Idaho | Department of Energy 3: Kootenai River Restoration at Bonners Ferry, Boundary County, Idaho EA-1973: Kootenai River Restoration at Bonners Ferry, Boundary County, Idaho Summary Bonneville Power Administration (BPA) is preparing an EA to assess the potential environmental impacts of funding the Kootenai Tribe of Idaho to restore portions of the Kootenai River near the town of Bonners Ferry, Idaho. The proposed project involves installing structures on the river banks, excavating areas

  1. PIA - Savannah River Nuclear Solution (SRNS) Energy Employees Occupational

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Illness Compensation Program Act (EEOICPA) | Department of Energy Energy Employees Occupational Illness Compensation Program Act (EEOICPA) PIA - Savannah River Nuclear Solution (SRNS) Energy Employees Occupational Illness Compensation Program Act (EEOICPA) PIA - Savannah River Nuclear Solution (SRNS) Energy Employees Occupational Illness Compensation Program Act (EEOICPA) PDF icon PIA - Savannah River Nuclear Solution (SRNS) Energy Employees Occupational Illness Compensation Program Act

  2. PIA - Savannah River Operations Office Executive Commitment Action Tracking

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System | Department of Energy Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PDF icon PIA - Savannah River Operations Office Executive Commitment Action Tracking System More Documents & Publications PIA - GovTrip (DOE data) PIA - Bonneville Power Adminstration Ethics Helpline

  3. PIA - Savannah River Operations Office File and Print Services | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy File and Print Services PIA - Savannah River Operations Office File and Print Services PIA - Savannah River Operations Office File and Print Services PDF icon PIA - Savannah River Operations Office File and Print Services More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - GovTrip (DOE data)

  4. DOE - Office of Legacy Management -- Savannah River Swamp - SC 01

    Office of Legacy Management (LM)

    Savannah River Swamp - SC 01 FUSRAP Considered Sites Site: Savannah River Swamp (SC.01 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see http://www.srs.gov/general/pubs/ERsum/2001Reportpdfs/chapter10ar.pdf Documents Related to Savannah River Swamp

  5. EIS-0268: Shutdown of River Water System at the Savannah River Site

    Broader source: Energy.gov [DOE]

    This EIS evaluates the potential environmental impacts of a proposal to shut down the Savannah R]ver Site River Water System in order to save money; that is, to prevent further expenditure of the...

  6. Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site, IG-0377

    Office of Environmental Management (EM)

    IG-1 INFORMATION: Report on "Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site" The Secretary BACKGROUND: During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five

  7. Savannah River Laboratory monthly report, February 1992

    SciTech Connect (OSTI)

    Ferrell, J.M.; Ice, L.W.

    1992-02-01

    This report is a progress report for the Savannah River Laboratory for the month of February 1992. The progress and activities in six categories were described in the report. The categories are reactor, tritium, separations, environmental, waste management, and general. Each category described numerous and varied activities. Some examples of these activities described are such things as radiation monitoring, maintenance, modifications, and remedial action.

  8. Savannah River Technology Center. Monthly report

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    This is a monthly progress report from the Savannah River Laboratory for the month of January 1993. It has sections with work in the areas of reactor safety, tritium processes and absorption, separations programs and wastes, environmental concerns and responses, waste management practices, and general concerns.

  9. Savannah River Technology Center. Monthly report

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This document contains information about the research programs being conducted at the Savannah River Plant. Topics of discussion include: thermal cycling absorption process, development of new alloys, ion exchange, oxalate precipitation, calcination, environmental research, remedial action, ecological risk assessments, chemical analysis of salt cakes, natural phenomena hazards assessment, and sampling of soils and groundwater.

  10. Metal pollution of river Msimbazi, Tanzania

    SciTech Connect (OSTI)

    Ak'habuhaya, J.; Lodenius, M. )

    1988-01-01

    The Misimbazi River in Dar es Salaam is polluted with industrial, urban and agricultural waste waters. A preliminary investigation on the extent of metal pollution (Hg, Cr, Cu, Zn, Fe, Ni, Cd, Mn, Al) was made from samples of sediments and biological indicators. The metal concentrations were in general low, but some of our results indicated industrial pollution.

  11. The Savannah River Site's Groundwater Monitoring Program

    SciTech Connect (OSTI)

    Not Available

    1992-08-03

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted during the first quarter of 1992. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official document of the analytical results.

  12. The Savannah River Site's groundwater monitoring program

    SciTech Connect (OSTI)

    Not Available

    1991-10-18

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by EPD/EMS in the first quarter of 1991. In includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program's activities and rationale, and serves as an official document of the analytical results.

  13. Land Use Baseline Report Savannah River Site

    SciTech Connect (OSTI)

    Noah, J.C.

    1995-06-29

    This document is to serve as a resource for Savannah River Site managers, planners, and SRS stakeholders by providing a general description of the site and land-use factors important to future use decisions and plans. The intent of this document is to be comprehensive in its review of SRS and the surrounding area.

  14. EIS-0351: Operation of Flaming Gorge Dam, Colorado River Storage Project, Colorado River, UT

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Secretary of the United States Department of the Interior (Secretary), acting through the Bureau of Reclamation (Reclamation), is considering whether to implement a proposed action under which Flaming Gorge Dam would be operated to achieve the flow and temperature regimes recommended in the September 2000 report Flow and Temperature Recommendations for Endangered Fishes in the Green River Downstream of Flaming Gorge Dam (2000 Flow and Temperature Recommendations), published by the Upper Colorado River Endangered Fish Recovery Program (Recovery Program).

  15. Wind River Watershed Restoration: 1999 Annual Report.

    SciTech Connect (OSTI)

    Connolly, Patrick J.

    2001-09-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its first year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey--Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW). Following categories given in the FY1999 Statement of Work, the broad categories, the related objectives, and the entities associated with each objective (lead entity in boldface) were as follows: Coordination--Objective 1: Coordinate the Wind River watershed Action Committee (AC) and Technical Advisory Committee (TAC) to develop a prioritized list of watershed enhancement projects. Monitoring--Objective 2: Monitor natural production of juvenile, smolt, and adult steelhead in the Wind River subbasin. Objective 3: Evaluate physical habitat conditions in the Wind River subbasin. Assessment--Objective 4: Assess watershed health using an ecosystem-based diagnostic model that will provide the technical basis to prioritize out-year restoration projects. Restoration--Objective 5: Reduce road related sediment sources by reducing road densities to less than 2 miles per square mile. Objective 6: Rehabilitate riparian corridors, flood plains, and channel morphology to reduce maximum water temperatures to less than 61 F, to increase bank stability to greater than 90%, to reduce bankfull width to depth ratios to less than 30, and to provide natural levels of pools and cover for fish. Objective 7: Maintain and evaluate passage for adult and juvenile steelhead at artificial barriers. Education--Objective 8: Promote watershed stewardship among students, the community, private landowners, and local governments. Progress towards six of eight of these objectives is described within nine separate reports included in a four-volume document.

  16. Savannah River Site Achieves Transuranic Waste Disposition Goal in 2013 |

    Energy Savers [EERE]

    Department of Energy Savannah River Site Achieves Transuranic Waste Disposition Goal in 2013 Savannah River Site Achieves Transuranic Waste Disposition Goal in 2013 December 24, 2013 - 12:00pm Addthis Workers gather behind a “Safety and Security begins with Me” banner at the Savannah River Site. Workers gather behind a "Safety and Security begins with Me" banner at the Savannah River Site. Workers sort through transuranic waste at the Savannah River Site. Workers sort

  17. The Savannah River Site's Groundwater Monitoring Program

    SciTech Connect (OSTI)

    Not Available

    1989-01-01

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  18. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    SEEMAN, S.E.

    2000-04-01

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  19. Roger Seitz Savannah River National Laboratory

    Office of Environmental Management (EM)

    Practical Considerations for Development and Selection of Scenarios Roger Seitz Savannah River National Laboratory 3 June 2014 PA&RA Community of Practice SRNL-MS-2014-00076 2 PA&RA Community of Practice - 3 June 2014 Introduction ! Need set of cases to consider for quantitative assessments to evaluate effectiveness of disposal or remedial actions ! Emphasis on understanding roles and functions of "barriers" in context of system behavior rather than exact predictions

  20. Beasley Lab | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ecology and Management of Wild Pigs SPATIAL ECOLOGY, POPULATION DYNAMICS, GENETIC STRUCTURE, AND DISEASE DYNAMICS OF WILD PIGS ON THE SAVANNAH RIVER SITE SREL Collaborators: Jim Beasley, Gene Rhodes, Shem Unger Outside Collaborators: Fred Cunningham (APHIS), Kim Pepin (APHIS), John Kilgo (USFS), Tracy Grazia (USFS), Toni Piaggio (APHIS) Wild pigs (Sus scrofa) are a highly invasive species that are rapidly expanding in number and distribution throughout the U.S. It is estimated that wild pig

  1. Waste management units: Savannah River Site

    SciTech Connect (OSTI)

    Molen, G.

    1991-09-01

    This report indexes every waste management unit of the Savannah River Site. They are indexed by building number and name. The waste units are also tabulated by solid waste units receiving hazardous materials with a known release or no known release to the environment. It also contains information on the sites which has received no hazardous waste, and units which have received source, nuclear, or byproduct material only. (MB)

  2. Judith L. Greene | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Greene Curriculum Vitae Faculty & Scientists SREL Home SREL Herpetology Judith L. Greene Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-7637 office (803) 725-3309 fax jgreene(at)srel.uga.edu My research interests include the population dynamics and ecology and of reptiles and amphibians, particularly turtles. Objectives have included documenting the distribution and abundance patterns of herpetofauna and relating this to conservation issues for herps , as well as

  3. Kurt Buhlmann | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Buhlmann Curriculum Vitae Faculty & Scientists SREL Home SREL Herpetology Kurt A. Buhlmann Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5293 office (803) 725-3309 fax buhlmann(at)uga.edu Research interests: A major focus of my research has been the life history and evolutionary ecology of amphibians and reptiles, primarily chelonians, with application to conservation and habitat management. Past research has included evaluation of terrestrial habitat requirements

  4. In the News | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In the News SREL ecologist finds another cause of antibiotic resistance (UGA Columns, 15 Feb. 2016) When antibiotics stop working: Local ecologist looks at alternative cause of antibiotic resistance (Aiken Standard, 08 Feb. 2016) Research opportunities for students offered at Savannah River Ecology Lab (Aiken Standard, 19 Dec. 2015) Joshua King presents at symposium (Aiken Standard, 26 Oct. 2015) Buhlmann honored for reptile work (Aiken Standard, 30 Aug. 2015) How chemicals from one Superfund

  5. Upcoming Seminars | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upcoming Seminars Seminars will be held at the Savannah River Ecology Laboratory, Bldg. 737-A, in the Cypress Room, at 3:30 PM. Snacks will be provided at 3:15. DATE SPEAKER TITLE 3:30 PM Thursday, March 17, 2016 Dan Quinn, MS Candidate, SREL/Warnell School of Forestry and Natural Resources, UGA Head-starting as a conservation tool for Gopher Tortoises (Gopherus polyphemus) SREL seminar committee: Dr. Gary Mills (chair), Margaret Wead, Linda Lee, Wes Flynn

  6. Waste management units - Savannah River Site

    SciTech Connect (OSTI)

    Not Available

    1989-10-01

    This report is a compilation of worksheets from the waste management units of Savannah River Plant. Information is presented on the following: Solid Waste Management Units having received hazardous waste or hazardous constituents with a known release to the environment; Solid Waste Management Units having received hazardous waste or hazardous constituents with no known release to the environment; Solid Waste Management Units having received no hazardous waste or hazardous constituents; Waste Management Units having received source; and special nuclear, or byproduct material only.

  7. Savannah River Site | National Nuclear Security Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages

    Savannah River Site | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at

  8. Savannah river site | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    river site | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog

  9. Notices Susquehanna River in York, Dauphin,

    Energy Savers [EERE]

    40 Federal Register / Vol. 81, No. 22 / Wednesday, February 3, 2016 / Notices Susquehanna River in York, Dauphin, and Lancaster counties, Pennsylvania. The project does not occupy federal lands. The applicants seek Commission approval to transfer the license for the Spencer Mountain Hydroelectric Project from the transferor to the transferee. Applicant Contact: For transferor: Mr. Boyce Falls, Manager, Advantage Investment Group, LLC, PO Box 458, Dallas, NC 28034, Phone: 704-363- 5911, Email:

  10. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  11. Radioactivity in Precipitation: Methods & Observations from Savannah River

    Office of Environmental Management (EM)

    Site | Department of Energy Radioactivity in Precipitation: Methods & Observations from Savannah River Site Radioactivity in Precipitation: Methods & Observations from Savannah River Site Presentation from the 33rd Tritium Focus Group Meeting held in Aiken, South Carolina on April 22-24, 2014. PDF icon Radioactivity in Precipitation: Methods & Observations from Savannah River Site More Documents & Publications DOE-HDBK-1129-2008 F-Tank Farm Performance Assessment, Rev 1

  12. Polymer Exposure and Testing Facilities at the Savannah River Site |

    Office of Environmental Management (EM)

    Department of Energy Polymer Exposure and Testing Facilities at the Savannah River Site Polymer Exposure and Testing Facilities at the Savannah River Site Presentation from the 33rd Tritium Focus Group Meeting held in Aiken, South Carolina on April 22-24, 2014. PDF icon Polymer Exposure and Testing Facilities at the Savannah River Site More Documents & Publications Advanced Polymers for Tritium Service Meeting Attendance - 33rd Tritium Focus Group Meeting Postdoctoral Research Awards

  13. U. S. Department of Energy Savannah River Operations Office - Leadership -

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ronald T. Bartholomew Ronald T. Bartholomew Ronald T. Bartholomew Director - Office of Safeguards, Security and Emergency Services U. S. Department of Energy Savannah River Operations Office Ronald T. Bartholomew Ronald (Ron) T. Bartholomew has served as the Director, Office of Safeguards, Security and Emergency Services (OSSES) for the U.S. Department of Energy (DOE) Savannah River Operations Office (SR) at the Savannah River Site (SRS) in Aiken, South Carolina, since June 2002. Mr.

  14. Texas-Louisiana- Mississippi Salt Basin Greater Green River Basin

    Gasoline and Diesel Fuel Update (EIA)

    Texas-Louisiana- Mississippi Salt Basin Greater Green River Basin W. Gulf Coast Basin Appalachian Basin Wind River Basin Eastern Shelf NW Shelf Abo Sussex-Shannon Muddy J Mesaverde- Lance-Lewis Medina/Clinton-Tuscarora Bradford-Venango-Elk Berea-Murrysville Piceance Basin Bossier Williston Basin Ft Worth Basin Davis Bighorn Basin Judith River- Eagle Permian Basin Anadarko Basin Denver Basin San Juan Basin North-Central Montana Area Uinta Basin Austin Chalk Codell-Niobrara Penn-Perm Carbonate

  15. 2011 Annual Planning Summary for Office of River Protection (ORP) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy River Protection (ORP) 2011 Annual Planning Summary for Office of River Protection (ORP) The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Oak Ridge Operations Office (OR) (See EM and SC APS). PDF icon 2011 Annual Planning Summary for Office of River Protection (ORP) More Documents & Publications 2011 Annual Planning Summary for Richland Operations Office (RL) 2012 Annual Planning Summary for Fossil

  16. A Supplement Analysis on Plutonium Consolidation at Savannah River Site |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy A Supplement Analysis on Plutonium Consolidation at Savannah River Site A Supplement Analysis on Plutonium Consolidation at Savannah River Site DOE's April 2002 decision to consolidate surplus, non-pit weapons-usable plutonium at Savannah River Site did not affect a 1997 DOE decision to continue storage of non-pit surplus plutonium at Hanford, Idaho National Laboratory and Los Alamos National Laboratory. PDF icon Supplement Analysis Plutonium Consolidation More Documents

  17. Savannah River National Laboratory Meets with Historically Black Colleges

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Universities | Department of Energy Savannah River National Laboratory Meets with Historically Black Colleges and Universities Savannah River National Laboratory Meets with Historically Black Colleges and Universities February 1, 2013 - 9:00am Addthis South Carolina State University students William Dumpson, left, and Alejandra Chirino, center, talk with Savannah River National Laboratory Director Dr. Terry Michalske at a recent research exchange involving the laboratory and seven

  18. Plutonium Isotopes in the Terrestrial Environment at the Savannah River

    Office of Scientific and Technical Information (OSTI)

    Site, USA. A Long-Term Study (Journal Article) | SciTech Connect Journal Article: Plutonium Isotopes in the Terrestrial Environment at the Savannah River Site, USA. A Long-Term Study Citation Details In-Document Search Title: Plutonium Isotopes in the Terrestrial Environment at the Savannah River Site, USA. A Long-Term Study This work presents the findings of a long term plutonium study at Savannah River Site (SRS) conducted between 2003 and 2013. Terrestrial environmental samples were

  19. Section 3116 Waste Determinationfor Salt Disposal at the Savannah River

    Office of Environmental Management (EM)

    Site, signed by Secretary of Energy, Samuel W. Bodman | Department of Energy Section 3116 Waste Determinationfor Salt Disposal at the Savannah River Site, signed by Secretary of Energy, Samuel W. Bodman Section 3116 Waste Determinationfor Salt Disposal at the Savannah River Site, signed by Secretary of Energy, Samuel W. Bodman PDF icon Section 3116 Waste Determinationfor Salt Disposal at the Savannah River Site, signed by Secretary of Energy, Samuel W. Bodman More Documents &

  20. Radioactivity in Precipitation: Methods and Observations from Savannah River Site

    Office of Environmental Management (EM)

    Radioactivity in Precipitation: Methods & Observations from Savannah River Site Dennis Jackson P.E. & Timothy Jannik - Savannah River National Laboratory Teresa Eddy - Savannah River Nuclear Solutions 1 H3 Tritium 3.0160492 Presented at the Tritium Focus Group Meeting April 22 - 24, 2014 Aiken, South Carolina 2 Significant Sources of Radionuclides to Atmosphere: Anthropogenic 3 Major Atmospheric Sources in the Unites States: DOE Nuclear Sites (19) 2007 Point Source Emissions: * DOE:

  1. Voluntary Protection Program Onsite Review, River Corridor Closure Project

    Office of Environmental Management (EM)

    - June 2012 | Department of Energy River Corridor Closure Project - June 2012 Voluntary Protection Program Onsite Review, River Corridor Closure Project - June 2012 June 2012 Evaluation to determine whether River Corridor Closure Project is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during June 11 - 14, 2012 to determine whether Washington Closure Hanford, LLC is continuing to perform at a level deserving DOE-VPP Star recognition. PDF

  2. Final Report: Particulate Emissions Testing, Unit 1, Potomac River

    Energy Savers [EERE]

    Generating Station, Alexandria, Virginia | Department of Energy Final Report: Particulate Emissions Testing, Unit 1, Potomac River Generating Station, Alexandria, Virginia Final Report: Particulate Emissions Testing, Unit 1, Potomac River Generating Station, Alexandria, Virginia Docket No. EO-05-01: TRC Environmental Corporation (TRC) of Lowell, Massachusetts was retained by Mirant Potomac River, LLC (Mirant) to provide sampling and analytical support in completing a Particulate Emission

  3. Letter from Commonwealth to Mirant Potomac River Concerning Serious

    Energy Savers [EERE]

    Violations of the National Ambient Air Quality Standards for Sulfur Dioxide | Department of Energy to Mirant Potomac River Concerning Serious Violations of the National Ambient Air Quality Standards for Sulfur Dioxide Letter from Commonwealth to Mirant Potomac River Concerning Serious Violations of the National Ambient Air Quality Standards for Sulfur Dioxide Docket No. EO-05-01: Letter from Commonwealth of Virginia to Mirant Potomac River concerning Serious Violations of the National

  4. DOE Selects Washington River Protection Solutions, LLC for Tank Operations

    Energy Savers [EERE]

    Contract at Hanford Site | Department of Energy Washington River Protection Solutions, LLC for Tank Operations Contract at Hanford Site DOE Selects Washington River Protection Solutions, LLC for Tank Operations Contract at Hanford Site May 29, 2008 - 12:51pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that Washington River Protection Solutions (WRPS), LLC has been selected as the tank operations contractor to store, retrieve and treat Hanford tank waste and

  5. Department of Energy Awards Hanford River Corridor Contract To Washington

    Energy Savers [EERE]

    Closure, LLC | Department of Energy Hanford River Corridor Contract To Washington Closure, LLC Department of Energy Awards Hanford River Corridor Contract To Washington Closure, LLC March 23, 2005 - 10:56am Addthis WASHINGTON, DC - U.S. Energy Secretary Samuel Bodman today announced that Washington Closure, LLC has been awarded the contract to manage the clean up and remediation of the Columbia River Corridor at the Department of Energy's Hanford Reservation in the state of Washington. The

  6. Consolidation of Surplus Plutonium at Savannah River Site | Department of

    Energy Savers [EERE]

    Energy Waste Management » Nuclear Materials & Waste » Consolidation of Surplus Plutonium at Savannah River Site Consolidation of Surplus Plutonium at Savannah River Site In April 2002, DOE decided to consolidate surplus, non-pit, weapons-usable plutonium that had been stored at the Rocky Flats Environmental Technology Site in long-term storage at the Savannah River Site. DOE Amends Record of Decision for Plutonium Consolidation A Supplement Analysis on Plutonium Consolidation at

  7. Contractor Fee Payments - Savannah River Operations Office | Department of

    Energy Savers [EERE]

    Energy Contractor Fee Payments - Savannah River Operations Office Contractor Fee Payments - Savannah River Operations Office See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Savannah River Site Office on these charts. PDF icon Liquid Waste Processing PDF icon Site Management and Operations PDF icon Comprehensive Security Services PDF icon Salt Waste Processing Facility More Documents & Publications Contractor Fee

  8. DOE Issues Salt Waste Determination for the Savannah River Site |

    Energy Savers [EERE]

    Department of Energy Salt Waste Determination for the Savannah River Site DOE Issues Salt Waste Determination for the Savannah River Site January 18, 2006 - 10:49am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued the waste determination for the treatment and stabilization of low activity salt-waste at the Savannah River Site allowing for significant reductions in environmental and health risks posed by the material. Stored in forty-nine underground tanks,

  9. Cleanup Performance Prompts Contract Changes at Hanford's River Corridor

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Performance Prompts Contract Changes at Hanford's River Corridor Cleanup Performance Prompts Contract Changes at Hanford's River Corridor June 30, 2015 - 12:00pm Addthis RICHLAND, Wash. - EM's Richland Operations Office has added an additional year to the current River Corridor Closure contract held by Washington Closure Hanford (WCH). The contract will now run to Sept. 30, 2016, focusing primarily on completing the trench work at the 618-10 Burial Ground and placing

  10. Microsoft PowerPoint - Arkansa River System Operation.ppt

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Serving The Army and the Nation Tulsa District Tulsa District Tulsa District Arkansas River System Arkansas River System Operation Operation One Corps Serving The Army and the Nation Tulsa District Overview Overview * * Tulsa District Tulsa District * * Authorized Purposes Authorized Purposes * * Types of projects and storage zones Types of projects and storage zones * * Flood damage risk reduction operation. Flood damage risk reduction operation. * * Arkansas River System Operation Arkansas

  11. CRAD, Emergency Management - Office of River Protection K Basin Sludge

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste System | Department of Energy Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System May 2004 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Emergency Management program at the Office of River

  12. Smith River Rancheria - Wind and Biomass Power Generation Feasibility Study

    Energy Savers [EERE]

    DOE Tribal Energy Program Program Review Meeting October 17 - 21, 2005 Greg Retzlaff Strategic Energy Solutions, Inc. Wind & Biomass Power Generation Smith River Rancheria 2 Smith River Rancheria * Coastal Community of 600 * Members Living in Oregon * Next Door to Booming Community * Additional Development Opportunities Wind & Biomass Power Generation Smith River Rancheria 3 Location * Northern California Location * Members in Oregon * Multiple Jurisdictions - Federal - Del Norte County

  13. Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE

    Energy Savers [EERE]

    $300 Million | Department of Energy Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE $300 Million Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE $300 Million December 17, 2015 - 12:35pm Addthis A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. RICHLAND, Wash. - The River Corridor Closure

  14. Richland/Office of River Protection | Department of Energy

    Energy Savers [EERE]

    Richland/Office of River Protection Richland/Office of River Protection Below are compliance agreements and accompanying summaries for the Richland Operations Office and Office of River Protection at the Hanford site. PDF icon Settlement Agreement re: Washington v. Bodman, January 6, 2006 PDF icon Administrative Order, June 13, 2000 PDF icon Administrative Order, June 13, 2000 Summary PDF icon Federal Facility Compliance Agreement on Storage of Polychlorinated Biphenyls, August 8, 1996 PDF icon

  15. Independent Oversight Inspection, Savannah River Site Office - December

    Energy Savers [EERE]

    2009 | Department of Energy Office - December 2009 Independent Oversight Inspection, Savannah River Site Office - December 2009 December 2009 Inspection of Nuclear Safety at the Savannah River Site Office and the Tritium Program Facilities This report documents the results of an inspection of nuclear safety at several National Nuclear Security Administration (NNSA) facilities located at Department of Energy's (DOE) Savannah River Site. The inspection was performed during August and September

  16. Independent Oversight Review, Savannah River Site - September 2011 |

    Energy Savers [EERE]

    Department of Energy - September 2011 Independent Oversight Review, Savannah River Site - September 2011 September 2011 Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities This report provides the results of an independent oversight review of the of the Implementation Verification Review (IVR) processes for the Environmental Management nuclear facilities at the Department of Energy's (DOE) Savannah River Site. The

  17. Gila River Indian Community Renewable Energy Feasibility Study

    Office of Environmental Management (EM)

    antaresgroupinc.com Gila River Indian Community Renewable Energy Feasibility Study Presented by: ANTARES Group Inc. Tim Rooney Anneliese Schmidt Gila River Indian Community DEQ Rudy Mix March 25, 2014 ANTARES Group Incorporated www.antaresgroupinc.com Presentation Outline * Summary of Gila River Indian Community * Project overview * Summary of feasibility study assessment - Solar projects - Biomass resource assessment - Biomass projects * Project status and future plans 2 www.antaresgroupinc.com

  18. PIA - Savannah River Nuclear Solutions Badge Request and Site Personnel

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Roster Systems | Department of Energy Badge Request and Site Personnel Roster Systems PIA - Savannah River Nuclear Solutions Badge Request and Site Personnel Roster Systems PIA - Savannah River Nuclear Solutions Badge Request and Site Personnel Roster Systems PDF icon PIA - Savannah River Nuclear Solutions Badge Request and Site Personnel Roster Systems More Documents & Publications PIA - 10th International Nuclear Graphite Specialists Meeting registration web site PIA - HSPD-12 Physical

  19. PIA - Savannah River Nuclear Solutions Electronic Safeguards Security

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System (E3S) | Department of Energy Electronic Safeguards Security System (E3S) PIA - Savannah River Nuclear Solutions Electronic Safeguards Security System (E3S) PIA - Savannah River Nuclear Solutions Electronic Safeguards Security System (E3S) PDF icon PIA - Savannah River Nuclear Solutions Electronic Safeguards Security System (E3S) More Documents & Publications PIA - 10th International Nuclear Graphite Specialists Meeting registration web site PIA - HSPD-12 Physical and Logical

  20. PIA - Savannah River Nuclear Solutions Training Records and Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Network (TRAIN) | Department of Energy Nuclear Solutions Training Records and Information Network (TRAIN) PIA - Savannah River Nuclear Solutions Training Records and Information Network (TRAIN) PIA - Savannah River Nuclear Solutions Training Records and Information Network (TRAIN) PDF icon PIA - Savannah River Nuclear Solutions Training Records and Information Network (TRAIN) More Documents & Publications PIA - HSPD-12 Physical and Logical Access System PIA - WEB Unclassified Business

  1. John C. Barnes of Savannah River Operations named 2012 Facility

    Office of Environmental Management (EM)

    Representative of the Year | Department of Energy John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year August 20, 2013 - 8:27am Addthis John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year About 200 Department of Energy (DOE) federal employees are Facility Representatives (FR) who provide day-to-day oversight of contractor

  2. Implemntation of the Recovery Act at the Savannah River Site

    Office of Environmental Management (EM)

    Implementation of the Recovery Act at the Savannah River Site OAS-RA-L-11-12 September 2011 Department of Energy Washington, DC 20585 September 29, 2011 MEMORANDUM FOR THE MANAGER, SAVANNAH RIVER OPERATIONS OFFICE FROM: Daniel M. Weeber, Director Environment, Technology, and Corporate Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Implementation of the Recovery Act at the Savannah River Site" Audit Report Number: OAS-RA-L-11-12 BACKGROUND The

  3. Independent Oversight Review, Savannah River Field Office Tritium

    Office of Environmental Management (EM)

    Facilities - November 2013 | Department of Energy Field Office Tritium Facilities - November 2013 Independent Oversight Review, Savannah River Field Office Tritium Facilities - November 2013 November 13, 2013 Review of Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation This report documents the results of an independent oversight review of the radiological protection program at the Savannah River Site (SRS) tritium facilities implemented at the

  4. Independent Oversight Review, Savannah River Operations Office - July 2013

    Office of Environmental Management (EM)

    | Department of Energy Operations Office - July 2013 Independent Oversight Review, Savannah River Operations Office - July 2013 July 2013 Review of the Employee Concerns Program at the Savannah River Operations Office The purpose of this Independent Oversight targeted review was to evaluate DOE-SR processes and their implementation for addressing safety concerns reported by DOE, contractor, and subcontractor employees at the Savannah River Site (SRS). This targeted review was performed at

  5. Independent Oversight Review, Savannah River Site Tritium Facilities - June

    Office of Environmental Management (EM)

    2012 | Department of Energy June 2012 Independent Oversight Review, Savannah River Site Tritium Facilities - June 2012 June 2012 Review of the Savannah River Site Tritium Facilities Implementation Verification Review Processes This report documents the results of an independent review of the implementation verification review (IVR) processes at the Department of Energy's (DOE) Savannah River Site Tritium Facilities. The review was conducted April 16-19, 2012, by the DOE Office of Safety and

  6. DOE - Office of Legacy Management -- Elk River Reactor - MN 01

    Office of Legacy Management (LM)

    Elk River Reactor - MN 01 FUSRAP Considered Sites Site: Elk River Reactor (MN.01 ) Eliminated from consideration under FUSRAP - Reactor was dismantled and decommissioned by 1974 Designated Name: Not Designated Alternate Name: None Location: Elk River , Minnesota MN.01-1 Evaluation Year: 1985 MN.01-1 Site Operations: Boiling water reactor demonstration, research and development program MN.01-1 Site Disposition: Eliminated MN.01-1 Radioactive Materials Handled: None Indicated Primary Radioactive

  7. 2010 Annual Planning Summary for Savannah River Operations Office (SRS) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Savannah River Operations Office (SRS) 2010 Annual Planning Summary for Savannah River Operations Office (SRS) Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. PDF icon 2010 Annual Planning Summary for Savannah River Operations Office (SRS) More

  8. River Turbine Provides Clean Energy to Remote Alaskan Village | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy River Turbine Provides Clean Energy to Remote Alaskan Village River Turbine Provides Clean Energy to Remote Alaskan Village August 18, 2015 - 10:36am Addthis River Turbine Provides Clean Energy to Remote Alaskan Village Alison LaBonte Marine and Hydrokinetic Technology Manager To date, Ocean Renewable Power Company (ORPC) is the only company to have built, operated and delivered power to a utility grid from a hydrokinetic tidal project, and to a local microgrid from a hydrokinetic

  9. Employee of Savannah River Site Contractor Recognized as Exemplary in

    Office of Environmental Management (EM)

    Safety and Health | Department of Energy Employee of Savannah River Site Contractor Recognized as Exemplary in Safety and Health Employee of Savannah River Site Contractor Recognized as Exemplary in Safety and Health October 29, 2015 - 12:00pm Addthis Sharon Kidd, a Savannah River Remediation electrical and instrumentation technician, receives the Safety and Health Achievement Award from VPPPA Board Chairman Mike Maddox at the 31st Annual National Voluntary Protection Program

  10. U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nanoparticle-enhanced Ionic Liquids as Heat Transfer Fluids As the demand for renewable energy sources is on the rise, scientists at the Savannah River National Laboratory (SRNL) ...

  11. Compound and Elemental Analysis At Snake River Plain Region ...

    Open Energy Info (EERE)

    | Sign Up Search Page Edit with form History Compound and Elemental Analysis At Snake River Plain Region (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home...

  12. Reflection Survey At Snake River Plain Region (DOE GTP) | Open...

    Open Energy Info (EERE)

    Community Login | Sign Up Search Page Edit with form History Reflection Survey At Snake River Plain Region (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home...

  13. Singing River Electric Power Association- Comfort Advantage Home Program

    Broader source: Energy.gov [DOE]

    Singing River Electric Power Association provides rebates on energy efficiency measures in new homes and heat pumps that meet Comfort Advantage weatherization standards. To qualify for this rebate...

  14. River Inn Natural Hot Spring Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Inn Natural Hot Spring Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name River Inn Natural Hot Spring Pool & Spa Low Temperature Geothermal Facility...

  15. Savannah River Site Liquid Waste Contractor Earns Excellent Performanc...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM acknowledged SRR management's responsiveness to identify value-added engagement ... Successful First Year at Savannah River Site SRR employees work through the Lean process. ...

  16. Yellow River Water and Hydropower Development Corp | Open Energy...

    Open Energy Info (EERE)

    Henan Province, China Zip: 450003 Sector: Hydro Product: Responsible for developing hydroelectric projects over the Yellow River. Coordinates: 34.762501, 113.653023 Show Map...

  17. Salt River Electric- Residential Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Salt River Electric serves as the rural electric provider in Kentucky's Bullitt, Nelson, Spencer, and Washington counties. Residential customers are eligible for a variety of cash incentives for...

  18. Principal Media Contact: Lindsey Evans Savannah River Nuclear...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for the site's production reactors. The nomination was submitted by Dr. Elizabeth Hoffman of SRNL and Dr. Elliott Clark, formerly of SRNL, on behalf of the Savannah River...

  19. Voluntary Protection Program Onsite Review, Savannah River Site- May 2010

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether the Savannah River Site is continuing to perform at a level deserving DOE-VPP Star recognition.

  20. Type B Accident Investigation of the Savannah River Site Arc...

    Broader source: Energy.gov (indexed) [DOE]

    Type B Accident Investigation Board investigation of the September 23, 2009, employee burn injury at the Department of Energy (DOE) Savannah River Site (SRS) D Area powerhouse....

  1. Principal Media Contact: Lindsey Evans Savannah River Nuclear...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    containers is being main- tained at the Site. Savannah River Nuclear Solutions is a Fluor-led company whose members are Fluor Federal Services, Newport News Nuclear and...

  2. Independent Activity Report, Savannah River Site- June 2011

    Broader source: Energy.gov [DOE]

    Defense Nuclear Facilities Safety Board Public Meeting in Augusta, Ga, Regarding the Savannah River Site [HIAR-SRS-2011-06-16

  3. Concept Testing and Development at the Raft River Geothermal...

    Office of Environmental Management (EM)

    Development at the Raft River Geothermal Field, Idaho presentation at the April 2013 peer review meeting held in Denver, Colorado. PDF icon raftriverpeer2013.pdf More...

  4. Concept Testing and Development at the Raft River Geothermal...

    Broader source: Energy.gov (indexed) [DOE]

    Development at the Raft River Geothermal Field, Idaho presentation at the April 2013 peer review meeting held in Denver, Colorado. raftriverpeer2013.pdf More Documents &...

  5. Project Reports for Yukon River Inter-Tribal Watershed Council

    Broader source: Energy.gov [DOE]

    The Yukon River Inter-Tribal Watershed Council (YRITWC) is an international organization with 501(c)(3) nonprofit status in the United States and Societal Status in Canada.

  6. BPA celebrates protection of Lemhi River fish and wildlife habitat

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    celebrates-protection-of-Lemhi-River-fish-and-wildlife-habitat Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives...

  7. Enterprise Assessments Review of the Savannah River Site Emergency...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 Enterprise Assessments Review of the Savannah River Site Emergency Management Exercise Program - November 2015 November 2015 Review of Emergency Management Exercise ...

  8. Department of Energy Cites Savannah River Nuclear Solutions,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Addthis Related Articles Department of Energy Cites Savannah River Nuclear Solutions for Worker Safety and Health Violations Department of Energy Cites Parsons Infrastructure & ...

  9. MHK Projects/Yukon River Hydrokinetic Turbine Project | Open...

    Open Energy Info (EERE)

    Yukon River Hydrokinetic Turbine Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... "minzoom":false,"mappingservice":"googlem...

  10. MHK Projects/GCK Technology Amazon River Brazil | Open Energy...

    Open Energy Info (EERE)

    Amazon River Brazil < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... "minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP...

  11. North Great River, New York: Energy Resources | Open Energy Informatio...

    Open Energy Info (EERE)

    Great River, New York: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 40.756272, -73.170087 Show Map Loading map... "minzoom":false,"mappingse...

  12. Great River, New York: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Great River, New York: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 40.7212097, -73.1576139 Show Map Loading map... "minzoom":false,"mapping...

  13. MHK Projects/Cornwall Ontario River Energy CORE | Open Energy...

    Open Energy Info (EERE)

    Cornwall Ontario River Energy CORE < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... "minzoom":false,"mappingservice":"googlemaps3",...

  14. Oregon Willamette River Basin Mitigation Agreement | Open Energy...

    Open Energy Info (EERE)

    River Basin Mitigation Agreement Author State of Oregon Recipient Bonneville Power Administration Published Publisher Not Provided, 10222010 DOI Not Provided Check for DOI...

  15. Independent Oversight Review, Savannah River Site- June 2012

    Broader source: Energy.gov [DOE]

    Review of Electrical System Configuration Management, Safety Instrumented System Commercial Grade Dedication, Setpoint Calculations, and Software Testing at the Savannah River Site, Waste Solidification Building Project

  16. PIA - Savannah River Nuclear Solutions (SRNS) Human Resource...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contractor (HRMS) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing System (Assistant)

  17. PIA - Savannah River Nuclear Solution (SRNS) Energy Employees...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing System (Assistant)) PIA - Savannah River Nuclear Solution (SRNS) Procurement ...

  18. PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System (HRMS) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing System (Assistant)

  19. PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Alcohol Testing System (Assistant)) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol ...

  20. Preliminary Notice of Violation, Savannah River Nuclear Solutions, LLC -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WEA-2012-04 | Department of Energy Savannah River Nuclear Solutions, LLC - WEA-2012-04 Preliminary Notice of Violation, Savannah River Nuclear Solutions, LLC - WEA-2012-04 November 9, 2012 Issued to Savannah River Nuclear Solutions (SRNS), LLC, related to a Worker Fall from a Scaffold in the K-Area Complex at the Savannah River Site On November 9, 2012, the U.S. Department of Energy (DOE) Office of Health, Safety and Security's Office of Enforcement and Oversight issued a Preliminary Notice

  1. Independent Oversight Review, Savannah River Field Office Tritium...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 Review of Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation This report documents the results of an independent oversight...

  2. Vermont Flood Hazard Area and River Corridor General Permit Applicatio...

    Open Energy Info (EERE)

    the developer should provide a map generated from the ANR Natural Resources Atlas showing the river corridor and flood hazard area; A written description of the...

  3. Tracer Testing At Raft River Geothermal Area (1984) | Open Energy...

    Open Energy Info (EERE)

    undertaken at Raft River geothermal area. References Kroneman, R. L.; Yorgason, K. R.; Moore, J. N. (1 December 1984) Preferred methods of analysis for chemical tracers in...

  4. Surface Water Sampling At Raft River Geothermal Area (1973) ...

    Open Energy Info (EERE)

    to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Surface Water Sampling At Raft River Geothermal Area (1973) Exploration Activity Details Location...

  5. Department of Energy Awards Hanford River Corridor Contract To...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Inc., Bechtel National Inc., CH2M Hill Inc., Eberline Services Inc., and Integrated Logistics Services Inc. The Columbia River Corridor is composed of roughly 210 square miles...

  6. Project Reports for Smith River Rancheria- 2006 Project

    Broader source: Energy.gov [DOE]

    Smith River Rancheria has a strong commitment to becoming energy self-sufficient, reduce their energy costs, and stimulate economic development in the community.

  7. Voluntary Protection Program Onsite Review, Savannah River Nuclear...

    Office of Environmental Management (EM)

    Llc Savannah River Site - October 2014 October 2014 Recertification of SRNS as a Star Participant in the Department of Energy Voluntary Protection Program. This report...

  8. Independent Oversight Review, Savannah River Site Salt Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the Savannah River Site Salt Waste Processing Facility Construction Quality and Fire Protection Systems The U.S. Department of Energy (DOE) Office of Enforcement and...

  9. MHK Projects/Microturbine River In Stream | Open Energy Information

    Open Energy Info (EERE)

    Project Technology *MHK TechnologiesMicroturbine River In Stream Project Licensing Environmental Monitoring and Mitigation Efforts See Tethys << Return to the MHK database...

  10. Independent Activity Report, Savannah River Site - March 2013...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    safety oversight activities. The Site Lead reviewed the differing professional opinion (DPO) program at the Savannah River Operations Office (Department of Energy (DOE)-SR). ...

  11. U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    segregation Ability to connect direct to a sensor Functionality over the Internet Authenticity schemes to ensure validity of data Patent applied for Savannah River National...

  12. City of Elk River, Minnesota (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Minnesota (Utility Company) Jump to: navigation, search Name: City of Elk River Place: Minnesota Phone Number: 763.441.2020 Website: www.elkriverutilities.com Facebook: https:...

  13. FLOWMETER ANALYSIS AT RAFT RIVER, IDAHO | Open Energy Information

    Open Energy Info (EERE)

    leads to estimated field hydraulic conductivity. Data were obtained during an injection test of a geothermal well at the Raft River geothermal test site in Idaho. Both stationary...

  14. Injectivity Test At Reese River Area (Henkle & Ronne, 2008) ...

    Open Energy Info (EERE)

    navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Injectivity Test At Reese River Area (Henkle & Ronne, 2008) Exploration Activity Details Location Reese...

  15. Preliminary Notice of Violation,Savannah River Nuclear Solutions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    associated with a June 14, 2010, employee puncture wound injury that occurred at the F-Canyon Facility at DOE's Savannah River Site. PDF icon Preliminary Notice of...

  16. U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER ...

    Office of Environmental Management (EM)

    operated by Savannah River Nuclear Solutions. The SRNL Technical Assistance Program: When standard approaches don't work Teams provide phased technical solutions that combine...

  17. U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Haptic seat provides feedback to drivers for improved vehicle fuel economy Engineers at Savannah River National Laboratory (SRNL) are working on development of a new method for...

  18. U. S. Department of Energy Savannah River Operations Office ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Support; Chief Financial Officer U. S. Department of Energy Savannah River Operations Office Douglas Hintze Douglas E. Hintze is the Assistant Manager for Mission Support and...

  19. Savannah River Technology Center monthly report, January 1994

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This is the monthly progress report for the Savannah River Technology Center, which covers the following areas of interest, Tritium, Separation processes, Environmental Issues, and Waste Management.

  20. Columbia River PUD- Residential Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Columbia River PUD offers a variety of rebates to residential customers for making energy efficient improvements to electrically heated homes. Rebates are available for Energy Star manufactured...