National Library of Energy BETA

Sample records for wabash river heritage

  1. Wabash River Coal Gasification Repowering Project Final Technical...

    Office of Scientific and Technical Information (OSTI)

    ... ten General Electric "F" class machines and the first such ... and the Wabash River system represents one of the few ... identified a process change to enhance nitrogen production. ...

  2. WABASH RIVER COAL GASIFICATION REPOWERING PROJECT

    SciTech Connect (OSTI)

    Unknown

    2000-09-01

    The close of 1999 marked the completion of the Demonstration Period of the Wabash River Coal Gasification Repowering Project. This Final Report summarizes the engineering and construction phases and details the learning experiences from the first four years of commercial operation that made up the Demonstration Period under Department of Energy (DOE) Cooperative Agreement DE-FC21-92MC29310. This 262 MWe project is a joint venture of Global Energy Inc. (Global acquired Destec Energy's gasification assets from Dynegy in 1999) and PSI Energy, a part of Cinergy Corp. The Joint Venture was formed to participate in the Department of Energy's Clean Coal Technology (CCT) program and to demonstrate coal gasification repowering of an existing generating unit impacted by the Clean Air Act Amendments. The participants jointly developed, separately designed, constructed, own, and are now operating an integrated coal gasification combined-cycle power plant, using Global Energy's E-Gas{trademark} technology (E-Gas{trademark} is the name given to the former Destec technology developed by Dow, Destec, and Dynegy). The E-Gas{trademark} process is integrated with a new General Electric 7FA combustion turbine generator and a heat recovery steam generator in the repowering of a 1950's-vintage Westinghouse steam turbine generator using some pre-existing coal handling facilities, interconnections, and other auxiliaries. The gasification facility utilizes local high sulfur coals (up to 5.9% sulfur) and produces synthetic gas (syngas), sulfur and slag by-products. The Project has the distinction of being the largest single train coal gasification combined-cycle plant in the Western Hemisphere and is the cleanest coal-fired plant of any type in the world. The Project was the first of the CCT integrated gasification combined-cycle (IGCC) projects to achieve commercial operation.

  3. WABASH RIVER INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLOGIES (IMPPCCT)

    SciTech Connect (OSTI)

    Albert Tsang

    2003-03-14

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is conducted by a multi-industry team lead by Gasification Engineering Corporation (GEC), a company of Global Energy Inc., and supported by Air Products and Chemicals, Inc., Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation. Three project phases are planned for execution over several years, including: (1) Feasibility study and conceptual design for an integrated demonstration facility, and for fence-line commercial embodiment plants (CEP) operated at Dow Chemical or Dow Corning chemical plant locations (2) Research, development, and testing to define any technology gaps or critical design and integration issues (3) Engineering design and financing plan to install an integrated commercial demonstration facility at the existing Wabash River Energy Limited (WREL) plant in West Terre Haute, Indiana.

  4. WABASH RIVER INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLOGIES (IMPPCCT)

    SciTech Connect (OSTI)

    Thomas Lynch

    2004-01-07

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is conducted by a multi-industry team lead previously by Gasification Engineering Corporation (GEC). The project is now under the leadership of ConocoPhillips Company (COP) after it acquired GEC and the E-Gas{trademark} gasification technology from Global Energy in July 2003. The Phase I of this project was supported by Air Products and Chemicals, Inc., Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation, while the Phase II is supported by Gas Technology Institute, TDA Research, Inc., and Nucon International, Inc. The two project phases planned for execution include: (1) Feasibility study and conceptual design for an integrated demonstration facility at Global Energy's existing Wabash River Energy Limited (WREL) plant in West Terre Haute, Indiana, and for a fence-line commercial embodiment plants (CEP) operated at Dow Chemical or Dow Corning chemical plant locations (2) Research, development, and testing (RD&T) to define any technology gaps or critical design and integration issues. The WREL facility was designed, constructed, and operated under a project selected and co-funded under the Round IV of the United States Department of Energy's (DOE's) Clean Coal Technology Program. In this project, coal and/or other solid fuel feedstocks are gasified in an oxygen-blown, entrained-flow gasifier with continuous slag removal and a dry particulate removal system. The resulting product synthesis gas is used to fuel a combustion turbine generator whose exhaust is integrated with a heat recovery steam generator to drive a refurbished steam turbine generator. The gasifier uses technology initially developed by The Dow Chemical Company (the Destec Gasification Process), and now acquired and offered commercially by COP as the E-GAS{trademark} technology. In a joint effort with the DOE, a Cooperative Agreement was awarded under the Early Entrance Coproduction Plant (EECP) solicitation. GEC, and now COP and the industrial partners are investigating the use of synthesis gas produced by the E-GAS{trademark} technology in a coproduction environment to enhance the efficiency and productivity of solid fuel gasification combined cycle power plants. The objectives of this effort are to determine the feasibility of an EECP located at a specific site which produces some combination of electric power (or heat), fuels, and/or chemicals from synthesis gas derived from coal, or, coal in combination with some other carbonaceous feedstock. The project's intended result is to provide the necessary technical, economic, and environmental information that will be needed to move the EECP forward to detailed design, construction, and operation by industry.

  5. WABASH RIVER INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLOGIES (IMPPCCT)

    SciTech Connect (OSTI)

    Gary Harmond; Albert Tsang

    2003-03-14

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is conducted by a multi-industry team lead by Gasification Engineering Corporation (GEC), a company of Global Energy Inc., and supported by Air Products and Chemicals, Inc., Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation. Three project phases are planned for execution over a three year period, including: (1) Feasibility study and conceptual design for an integrated demonstration facility, and for fence-line commercial embodiment plants (CEP) operated at Dow Chemical or Dow Corning chemical plant locations (2) Research, development, and testing to define any technology gaps or critical design and integration issues (3) Engineering design and financing plan to install an integrated commercial demonstration facility at the existing Wabash River Energy Limited (WREL) plant in West Terre Haute, Indiana. The WREL facility is a project selected and co-funded under the Round IV of the U.S. Department of Energy's (DOE's) Clean Coal Technology Program. In this project, coal and/or other solid fuel feedstocks are gasified in an oxygen-blown, entrained-flow gasifier with continuous slag removal and a dry particulate removal system. The resulting product synthesis gas is used to fuel a combustion turbine generator whose exhaust is integrated with a heat recovery steam generator to drive a refurbished steam turbine generator. The gasifier uses technology initially developed by The Dow Chemical Company (the Destec Gasification Process), and now offered commercially by Global Energy, Inc., as the E-GAS{trademark} technology. In a joint effort with the DOE, a Cooperative Agreement was awarded under the Early Entrance Coproduction Plant (EECP) solicitation. GEC and an Industrial Consortium are investigating the use of synthesis gas produced by the E-GAS{trademark} technology in a coproduction environment to enhance the efficiency and productivity of solid fuel gasification combined cycle power plants. During the reporting period, various methods to remove low-level contaminants for the synthesis gas were reviewed. In addition, there was a transition of the project personnel for GEC which has slowed the production of the outstanding project reports.

  6. WABASH RIVER IMPPCCT, INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLOGIES

    SciTech Connect (OSTI)

    Doug Strickland

    2001-09-28

    In a joint effort with the U.S. Department of Energy, working under a Cooperative Agreement Award from the ''Early Entrance Coproduction Plant'' (EECP) initiative, the Gasification Engineering Corporation and an Industrial Consortium are investigating the application of synthesis gas from the E-GAS{trademark} technology to a coproduction environment to enhance the efficiency and productivity of solid fuel gasification combined cycle power plants. The objectives of this effort are to determine the feasibility of an Early Entrance Coproduction Plant located at a specific site which produces some combination of electric power (or heat), fuels, and/or chemicals from synthesis gas derived from coal, or, coal in combination with some other carbonaceous feedstock. The project's intended result is to provide the necessary technical, financial, and environmental information that will be needed to move the EECP forward to detailed design, construction, and operation by industry. The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is conducted by a multi-industry team lead by Gasification Engineering Corporation (GEC), and supported by Air Products and Chemicals Inc., The Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation. Three project phases are planned for execution, including: (1) Feasibility Study and conceptual design for an integrated demonstration facility and for fence-line commercial plants operated at The Dow Chemical Company or Dow Corning Corporation chemical plant locations (i.e. the Commercial Embodiment Plant or CEP) (2) Research, development, and testing to address any technology gaps or critical design and integration issues (3) Engineering design and financing plan to install an integrated commercial demonstration facility at the existing Wabash River Energy Ltd., plant in West Terre Haute, Indiana. During the reporting period work was furthered to support the development of capital and operating cost estimates associated with the installation of liquid or gas phase methanol synthesis technology in a Commercial Embodiment Plant (CEP) utilizing the six cases previously defined. In addition, continued development of the plant economic model was accomplished by providing combined cycle performance data. Performance and emission estimates for gas turbine combined cycles was based on revised methanol purge gas information. The economic model was used to evaluate project returns with various market conditions and plant configurations and was refined to correct earlier flaws. Updated power price projections were obtained and incorporated in the model. Sensitivity studies show that break-even methanol prices which provide a 12% return are 47-54 cents/gallon for plant scenarios using $1.25/MM Btu coal, and about 40 cents/gallon for most of the scenarios with $0.50/MM Btu petroleum coke as the fuel source. One exception is a high power price and production case which could be economically attractive at 30 cents/gallon methanol. This case was explored in more detail, but includes power costs predicated on natural gas prices at the 95th percentile of expected price distributions. In this case, the breakeven methanol price is highly sensitive to the required project return rate, payback period, and plant on-line time. These sensitivities result mainly from the high capital investment required for the CEP facility ({approx}$500MM for a single train IGCC-methanol synthesis plant). Finally, during the reporting period the Defense Contractor Audit Agency successfully executed an accounting audit of Global Energy Inc. for data accumulated over the first year of the IMPPCCT project under the Cooperative Agreement.

  7. WABASH RIVER INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLOGIES (IMPPCCT)

    SciTech Connect (OSTI)

    Doug Strickland; Albert Tsang

    2002-10-14

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is conducted by a multi-industry team lead by Gasification Engineering Corporation (GEC), and supported by Air Products and Chemicals, Inc., Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation. Three project phases are planned for execution over a three year period, including: (1) Feasibility study and conceptual design for an integrated demonstration facility, and for fence-line commercial plants operated at Dow Chemical or Dow Corning chemical plant locations; (2) Research, development, and testing to define any technology gaps or critical design and integration issues; and (3) Engineering design and financing plan to install an integrated commercial demonstration facility at the existing Wabash River Energy Limited (WREL) plant in West Terre Haute, Indiana. This report describes management planning, work breakdown structure development, and feasibility study activities by the IMPPCCT consortium in support of the first project phase. Project planning activities have been completed, and a project timeline and task list has been generated. Requirements for an economic model to evaluate the West Terre Haute implementation and for other commercial implementations are being defined. Specifications for methanol product and availability of local feedstocks for potential commercial embodiment plant sites have been defined. The WREL facility is a project selected and co-funded under the fifth phase solicitation of the U.S. Department of Energy's Clean Coal Technology Program. In this project, coal and/or other solid fuel feedstocks are gasified in an oxygen-blown, entrained-flow gasifier with continuous slag removal and a dry particulate removal system. The resulting product synthesis gas is used to fuel a combustion turbine generator whose exhaust is integrated with a heat recovery steam generator to drive a refurbished steam turbine generator. The gasifier uses technology initially developed by The Dow Chemical Company (the Destec Gasification Process), and now offered commercially by Global Energy, Inc., as the E-GAS{trademark} technology. In a joint effort with the U.S. Department of Energy, working under a Cooperative Agreement Award from the ''Early Entrance Coproduction Plant'' (EECP) initiative, the GEC and an Industrial Consortia are investigating the application of synthesis gas from the E-GAS{trademark} technology to a coproduction environment to enhance the efficiency and productivity of solid fuel gasification combined cycle power plants. The objectives of this effort are to determine the feasibility of an EECP located at a specific site which produces some combination of electric power (or heat), fuels, and/or chemicals from synthesis gas derived from coal, or, coal in combination with some other carbonaceous feedstock. The project's intended result is to provide the necessary technical, economic, and environmental information that will be needed to move the EECP forward to detailed design, construction, and operation by industry.

  8. WABASH RIVER INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLOGIES (IMPPCCT)

    SciTech Connect (OSTI)

    Albert Tsang

    2003-03-14

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is conducted by a multi-industry team lead by Gasification Engineering Corporation (GEC), and supported by Air Products and Chemicals, Inc., Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation. Three project phases are planned for execution, including: (1) Feasibility study and conceptual design for an integrated demonstration facility, and for fence-line commercial embodiment plants (CEP) operated at Dow Chemical or Dow Corning chemical plant locations (2) Research, development, and testing (RD&T) to define any technology gaps or critical design and integration issues (3) Engineering design and financing plan to install an integrated commercial demonstration facility at the existing Wabash River Energy Limited (WREL) plant in West Terre Haute, Indiana. The WREL facility is a project selected and co-funded under the Round IV of the United States Department of Energy's (DOE's) Clean Coal Technology Program. In this project, coal and/or other solid fuel feedstocks are gasified in an oxygen-blown, entrained-flow gasifier with continuous slag removal and a dry particulate removal system. The resulting product synthesis gas is used to fuel a combustion turbine generator whose exhaust is integrated with a heat recovery steam generator to drive a refurbished steam turbine generator. The gasifier uses technology initially developed by The Dow Chemical Company (the Destec Gasification Process), and now offered commercially by Global Energy, Inc., parent company of GEC and WREL, as the E-GAS{trademark} technology. In a joint effort with the DOE, a Cooperative Agreement was awarded under the Early Entrance Coproduction Plant (EECP) solicitation. GEC and an Industrial Consortium are investigating the use of synthesis gas produced by the E-GAS{trademark} technology in a coproduction environment to enhance the efficiency and productivity of solid fuel gasification combined cycle power plants. The objectives of this effort are to determine the feasibility of an EECP located at a specific site which produces some combination of electric power (or heat), fuels, and/or chemicals from synthesis gas derived from coal, or, coal in combination with some other carbonaceous feedstock. The project's intended result is to provide the necessary technical, economic, and environmental information that will be needed to move the EECP forward to detailed design, construction, and operation by industry. During the reporting period, effort continues on identifying potential technologies for removing contaminants from synthesis gas to the level required by methanol synthesis. A liquid phase Claus process and a direct sulfur oxidation process were evaluated. Preliminary discussion was held with interested parties on cooperating on RD&T in Phase II of the project. Also, significant progress was made during the period in the submission of project deliverables. A meeting was held at DOE's National Energy Technology Laboratory in Morgantown between GEC and the DOE IMPPCCT Project Manager on the status of the project, and reached an agreement on the best way to wrap up Phase I and transition into the Phase II RD&T. Potential projects for the Phase II, cost, and fund availability were also discussed.

  9. WABASH RIVER INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLOGIES (IMPPCCT)

    SciTech Connect (OSTI)

    Albert Tsang

    2003-10-14

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is conducted by a multi-industry team lead by Gasification Engineering Corporation (GEC), and supported by Air Products and Chemicals, Inc., Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation. Two project phases are planned for execution, including: (1) Feasibility study and conceptual design for an integrated demonstration facility at the existing Wabash River Energy Limited (WREL) plant in West Terre Haute, Indiana, and for a fence-line commercial embodiment plants (CEP) operated at Dow Chemical or Dow Corning chemical plant locations (2) Research, development, and testing (RD&T) to define any technology gaps or critical design and integration issues. The WREL facility is a project selected and co-funded under the Round IV of the United States Department of Energy's (DOE's) Clean Coal Technology Program. In this project, coal and/or other solid fuel feedstocks are gasified in an oxygen-blown, entrained-flow gasifier with continuous slag removal and a dry particulate removal system. The resulting product synthesis gas is used to fuel a combustion turbine generator whose exhaust is integrated with a heat recovery steam generator to drive a refurbished steam turbine generator. The gasifier uses technology initially developed by The Dow Chemical Company (the Destec Gasification Process), and now offered commercially by Global Energy, Inc., parent company of GEC and WREL, as the E-GAS{trademark} technology. In a joint effort with the DOE, a Cooperative Agreement was awarded under the Early Entrance Coproduction Plant (EECP) solicitation. GEC and an Industrial Consortium are investigating the use of synthesis gas produced by the E-GAS{trademark} technology in a coproduction environment to enhance the efficiency and productivity of solid fuel gasification combined cycle power plants. The objectives of this effort are to determine the feasibility of an EECP located at a specific site which produces some combination of electric power (or heat), fuels, and/or chemicals from synthesis gas derived from coal, or, coal in combination with some other carbonaceous feedstock. The project's intended result is to provide the necessary technical, economic, and environmental information that will be needed to move the EECP forward to detailed design, construction, and operation by industry. During the reporting period, DOE approved the RD&T Plan submitted in the previous quarter. The RD&T Plan forms the basis for the Continuation Application to initiate the transition of the project from Phase I to Phase II. Potential technologies for removing contaminants from synthesis gas to the level required by methanol synthesis will be tested in slipstream units at the WREL facility during Phase II. A supplemental information package consisting of a revised Work Breakdown Structure and Budget Plan for Phase II and other necessary forms was also submitted. Agreement is being reached with DOE's patent attorney on the scope of the limited rights data to be provided under the Cooperative Agreement. Preparation of a comprehensive Final Report for Phase I of the project, which will consolidate the remaining deliverables including the Initial Feasibility Report, Concept Report, Site Analysis Report, Economic Analysis, and Preliminary Project Financing Plan, continued during the reporting period. Significant progress was made in the Subsystem Design Specification section of the report.

  10. Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT)

    SciTech Connect (OSTI)

    Conocophillips

    2007-09-30

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project was established to evaluate integrated electrical power generation and methanol production through clean coal technologies. The project was under the leadership of ConocoPhillips Company (COP), after it acquired Gasification Engineering Corporation (GEC) and the E-Gas gasification technology from Global Energy Inc. in July 2003. The project has completed both Phase 1 and Phase 2 of development. The two project phases include the following: (1) Feasibility study and conceptual design for an integrated demonstration facility at SG Solutions LLC (SGS), previously the Wabash River Energy Limited, Gasification Facility located in West Terre Haute, Indiana, and for a fence-line commercial embodiment plant (CEP) operated at the Dow Chemical Company or Dow Corning Corporation chemical plant locations. (2) Research, development, and testing (RD&T) to define any technology gaps or critical design and integration issues. Phase 1 of this project was supported by a multi-industry team consisting of Air Products and Chemicals, Inc., The Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation, while Phase 2 was supported by Gas Technology Institute, TDA Research Inc., and Nucon International, Inc. The SGS integrated gasification combined cycle (IGCC) facility was designed, constructed, and operated under a project selected and co-funded under the Round IV of the United States Department of Energy's (DOE's) Clean Coal Technology Program. In this project, coal and/or other carbonaceous fuel feedstocks are gasified in an oxygen-blown, entrained-flow gasifier with continuous slag removal and a dry particulate removal system. The resulting product synthesis gas (syngas) is used to fuel a combustion turbine generator whose exhaust is integrated with a heat recovery steam generator to drive a refurbished steam turbine generator. The gasifier uses technology initially developed by The Dow Chemical Company (the Destec Gasification Process), and now acquired and offered commercially by COP as the E-Gas technology. In a joint effort with the DOE, a Cooperative Agreement was awarded under the Early Entrance Coproduction Plant (EECP) solicitation. GEC, and later COP and the industrial partners investigated the use of syngas produced by the E-Gas technology in a coproduction environment to enhance the efficiency and productivity of solid fuel gasification combined cycle power plants. The objectives of this effort were to determine the feasibility of an EECP located at a specific site which produces some combination of electric power (or heat), fuels, and/or chemicals from syngas derived from coal, or, coal in combination with some other carbonaceous feedstock. The intended result of the project was to provide the necessary technical, economic, and environmental information that would be needed to move the EECP forward to detailed design, construction, and operation by industry. The EECP study conducted in Phase 1 of the IMPPCCT Project confirmed that the concept for the integration of gasification-based (E-Gas) electricity generation from coal and/or petroleum coke and methanol production (Liquid Phase Methanol or LPMEOH{trademark}) processes was feasible for the coproduction of power and chemicals. The results indicated that while there were minimal integration issues that impact the deployment of an IMPPCCT CEP, the major concern was the removal of sulfur and other trace contaminants, which are known methanol catalyst poisons, from the syngas. However, economic concerns in the domestic methanol market which is driven by periodic low natural gas prices and cheap offshore supplies limit the commercial viability of this more capital intensive concept. The objective of Phase 2 was to conduct RD&T as outlined in the Phase 1 RD&T Plan to enhance the development and commercial acceptance of coproduction technology. Studies were designed to address the technical concerns that would make the IMPPCCT concept competitive with natural gas-based systems in the commercial marketplace. Efforts in Phase 2 investigated the cleanup of the syngas by removing contaminants, particularly sulfur species, to a level acceptable for the methanol synthesis catalyst, and reducing the cost of the current sulfur removal system such as via warm gas cleanup methods. Laboratory testing followed by on-site field testing at SGS with bench-scale slipstream units was conducted. Actual syngas produced by the facility was evaluated at system pressure and temperature.

  11. WABASH RIVER INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLGIES (IMPPCCT)

    SciTech Connect (OSTI)

    Albert C. Tsang

    2004-03-26

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is under the leadership of ConocoPhillips Company (COP), after it acquired Gasification Engineering Corporation (GEC) and the E-Gas gasification technology from Global Energy in July 2003. The project has completed Phase I, and is currently in Phase II of development. The two project phases include: (1) Feasibility study and conceptual design for an integrated demonstration facility at Global Energy's existing Wabash River Energy Limited (WREL) plant in West Terre Haute, Indiana, and for a fence-line commercial embodiment plants (CEP) operated at Dow Chemical or Dow Corning chemical plant locations; and (2) Research, development, and testing (RD&T) to define any technology gaps or critical design and integration issues. The Phase I of this project was supported by a multi-industry team consisting of Air Products and Chemicals, Inc., Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation, while Phase II is supported by Gas Technology Institute, TDA Research Inc., and Nucon International, Inc. The WREL integrated gasification combined cycle (IGCC) facility was designed, constructed, and operated under a project selected and co-funded under the Round IV of the United States Department of Energy's (DOE's) Clean Coal Technology Program. In this project, coal and/or other solid fuel feedstocks are gasified in an oxygen-blown, entrained-flow gasifier with continuous slag removal and a dry particulate removal system. The resulting product synthesis gas is used to fuel a combustion turbine generator whose exhaust is integrated with a heat recovery steam generator to drive a refurbished steam turbine generator. The gasifier uses technology initially developed by The Dow Chemical Company (the Destec Gasification Process), and now acquired and offered commercially by COP as the E-Gas technology. In a joint effort with the DOE, a Cooperative Agreement was awarded under the Early Entrance Coproduction Plant (EECP) solicitation. GEC, and now COP and the industrial partners are investigating the use of synthesis gas produced by the E-Gas technology in a coproduction environment to enhance the efficiency and productivity of solid fuel gasification combined cycle power plants. The objectives of this effort are to determine the feasibility of an EECP located at a specific site which produces some combination of electric power (or heat), fuels, and/or chemicals from synthesis gas derived from coal, or, coal in combination with some other carbonaceous feedstock. The project's intended result is to provide the necessary technical, economic, and environmental information that will be needed to move the EECP forward to detailed design, construction, and operation by industry. The early entrance coproduction plant study conducted in Phase I of the IMPPCCT project confirmed that the concept for the integration of gasification-based (E-Gas) electricity generation from coal and/or petroleum coke and methanol production (Liquid Phase Methanol or LPMEOH{trademark}) processes was feasible for the coproduction of power and chemicals. The results indicated that while there are minimal integration issues that impact the deployment of an IMPPCCT CEP, the major concern was the removal of sulfur and other trace contaminants, which are known methanol catalyst poisons, from the synthesis gas (syngas). However, economic concerns in the domestic methanol market which is driven by periodic low natural gas prices and cheap offshore supplies limit the commercial viability of this more capital intensive concept. The objective of Phase II is to conduct RD&T as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. Studies will address the technical concerns that will make the IMPPCCT concept competitive with natural gas-based systems in the commercial marketplace. Efforts in Phase II will investigate the cleanup of the syngas by removing contaminants, particularly sulfur species, to a level acceptable for the methanol synthesis catalyst, and reducing the cost of the current sulfur removal system such as via warm gas cleanup methods. Laboratory testing followed by on-site testing at WREL with bench-scale slipstream units will be conducted. Actual syngas produced by the facility will be evaluated at system pressure and temperature. This report summarizes progress made during the period of October 1-December 31, 2003.

  12. Wabash County Rural E M C | Open Energy Information

    Open Energy Info (EERE)

    Wabash County Rural E M C Jump to: navigation, search Name: Heartland Rural E M C Address: 350 Wedcor Avenue Place: Wabash, Indiana Phone Number: (260) 563-2146 Website:...

  13. Wabash River Coal Gasification Repowering Project

    SciTech Connect (OSTI)

    Amick, P.; Mann, G.J.; Cook, J.J.; Fisackerly, R.; Spears, R.C.

    1992-01-01

    The Destec gasification process features an oxygen-blown, two stage entrained flow gasifier. PSI will procure coal for the Project consistent with the design specification ranges of Destec's coal gasification facility. Destec's plant will be designed to accept coal with a maximum sulfur content of 5.9% (dry basis) and a minimum energy content of 13,5000 BTU/pound (moisture and ash free basis). PSI and Destec will test at least two other coals for significant periods during the demonstration period. In the Destec process, coal is ground with water to form a slurry. It is then pumped into a gasification vessel where oxygen is added to form a hot raw gas through partial combustion. Most of the noncarbon material in the coal melts and flows out the bottom of the vessel forming slag -- a black, glassy, non-leaching, sand-like material. Particulates, sulfur and other impurities are removed from the gas before combustion to make it acceptable fuel for the gas turbine. The synthetic fuel gas (syngas) is piped to a General Electric MS 7001F high temperature combustion turbine generator. A heat recovery steam generator recovers gas turbine exhaust heat to produce high pressure steam. This steam and the steam generated in the gasification process supply an existing steam turbine-generator. The plant will be designed to outperform air emission standards established by the Clean Air Act Amendments for the year 2000.

  14. Wabash River Coal Gasification Repowering Project

    SciTech Connect (OSTI)

    Amick, P.; Mann, G.J.; Cook, J.J.; Fisackerly, R.; Spears, R.C.

    1992-11-01

    The Destec gasification process features an oxygen-blown, two stage entrained flow gasifier. PSI will procure coal for the Project consistent with the design specification ranges of Destec`s coal gasification facility. Destec`s plant will be designed to accept coal with a maximum sulfur content of 5.9% (dry basis) and a minimum energy content of 13,5000 BTU/pound (moisture and ash free basis). PSI and Destec will test at least two other coals for significant periods during the demonstration period. In the Destec process, coal is ground with water to form a slurry. It is then pumped into a gasification vessel where oxygen is added to form a hot raw gas through partial combustion. Most of the noncarbon material in the coal melts and flows out the bottom of the vessel forming slag -- a black, glassy, non-leaching, sand-like material. Particulates, sulfur and other impurities are removed from the gas before combustion to make it acceptable fuel for the gas turbine. The synthetic fuel gas (syngas) is piped to a General Electric MS 7001F high temperature combustion turbine generator. A heat recovery steam generator recovers gas turbine exhaust heat to produce high pressure steam. This steam and the steam generated in the gasification process supply an existing steam turbine-generator. The plant will be designed to outperform air emission standards established by the Clean Air Act Amendments for the year 2000.

  15. Wabash Valley Power Association (28 Member Cooperatives)- Residential Energy Efficiency Program

    Broader source: Energy.gov [DOE]

    Wabash Valley Power Association (WVPA) is a generation and transmission cooperative which provides wholesale electricity to 28 distribution systems in Indiana, Ohio, Michigan, Missouri, and...

  16. DOE - Office of Legacy Management -- Wabash River Ordnance Works...

    Office of Legacy Management (LM)

    Newport , Indiana IN.03-1 Evaluation Year: 1987 IN.03-2 Site Operations: Produced heavy water for the MED in the mid-1940s. IN.03-1 Site Disposition: Eliminated - Facility...

  17. Native American Heritage Month

    Broader source: Energy.gov [DOE]

    This month, we celebrate the rich heritage and myriad contributions of American Indians and Alaska Natives, and we rededicate ourselves to supporting tribal sovereignty, tribal self-determination,...

  18. Hispanic Heritage Month - Honoring a Heritage and Individual Success |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Hispanic Heritage Month - Honoring a Heritage and Individual Success Hispanic Heritage Month - Honoring a Heritage and Individual Success October 10, 2012 - 9:59am Addthis Dr. Karina Edmonds, the Department's Technology Transfer Director, speaks with Joan Michelson of Green Connections Radio about women in STEM last July. This week she is receiving a Career Achievement Award from Women of Color Magazine. Dr. Karina Edmonds, the Department's Technology Transfer Director,

  19. Heritage Garden | Open Energy Information

    Open Energy Info (EERE)

    Energy Developer Heritage Sustainable Energy Energy Purchaser Consumers Energy Detroit Edison Location Garden MI Coordinates 45.776334, -86.5527241 Show Map Loading...

  20. Heritage Flight | Open Energy Information

    Open Energy Info (EERE)

    Heritage Flight Sector Wind energy Facility Type Small Scale Wind Facility Status In Service Location South Burlington VT Coordinates 44.46312955, -73.14592659 Show Map...

  1. Celebrating National Hispanic Heritage Month | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hispanic Heritage Month Celebrating National Hispanic Heritage Month September 22, 2010 - 3:46pm Addthis Energy Department Photo Energy Department Photo Bill Valdez Bill Valdez ...

  2. Sequestration and Enhanced Coal Bed Methane: Tanquary Farms Test Site, Wabash County, Illinois

    SciTech Connect (OSTI)

    Scott Frailey; Thomas Parris; James Damico; Roland Okwen; Ray McKaskle; Charles Monson; Jonathan Goodwin; E. Beck; Peter Berger; Robert Butsch; Damon Garner; John Grube; Keith Hackley; Jessica Hinton; Abbas Iranmanesh; Christopher Korose; Edward Mehnert; Charles Monson; William Roy; Steven Sargent; Bracken Wimmer

    2012-05-01

    The Midwest Geological Sequestration Consortium (MGSC) carried out a pilot project to test storage of carbon dioxide (CO{sub 2}) in the Springfield Coal Member of the Carbondale Formation (Pennsylvanian System), in order to gauge the potential for large-scale CO{sub 2} sequestration and/or enhanced coal bed methane recovery from Illinois Basin coal beds. The pilot was conducted at the Tanquary Farms site in Wabash County, southeastern Illinois. A four-well design— an injection well and three monitoring wells—was developed and implemented, based on numerical modeling and permeability estimates from literature and field data. Coal cores were taken during the drilling process and were characterized in detail in the lab. Adsorption isotherms indicated that at least three molecules of CO{sub 2} can be stored for each displaced methane (CH{sub 4}) molecule. Microporosity contributes significantly to total porosity. Coal characteristics that affect sequestration potential vary laterally between wells at the site and vertically within a given seam, highlighting the importance of thorough characterization of injection site coals to best predict CO{sub 2} storage capacity. Injection of CO{sub 2} gas took place from June 25, 2008, to January 13, 2009. A “continuous” injection period ran from July 21, 2008, to December 23, 2008, but injection was suspended several times during this period due to equipment failures and other interruptions. Injection equipment and procedures were adjusted in response to these problems. Approximately 92.3 tonnes (101.7 tons) of CO{sub 2} were injected over the duration of the project, at an average rate of 0.93 tonne (1.02 tons) per day, and a mode injection rate of 0.6–0.7 tonne/day (0.66–0.77 ton/day). A Monitoring, Verification, and Accounting (MVA) program was set up to detect CO{sub 2 leakage. Atmospheric CO{sub 2} levels were monitored as were indirect indicators of CO{sub 2} leakage such as plant stress, changes in gas composition at wellheads, and changes in several shallow groundwater characteristics (e.g., alkalinity, pH, oxygen content, dissolved solids, mineral saturation indices, and isotopic distribution). Results showed that there was no CO{sub 2} leakage into groundwater or CO{sub 2} escape at the surface. Post-injection cased hole well log analyses supported this conclusion. Numerical and analytical modeling achieved a relatively good match with observed field data. Based on the model results the plume was estimated to extend 152 m (500 ft) in the face cleat direction and 54.9 m (180 ft) in the butt cleat direction. Using the calibrated model, additional injection scenarios—injection and production with an inverted five-spot pattern and a line drive pattern—could yield CH{sub 4} recovery of up to 70%.

  3. baepgig-wabriv | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Wabash River Coal Gasification Repowering Project - Project Brief PDF-250KB Wabash River Coal Gasification Repowering Project Joint Venture, West Terre Haute, IN Program ...

  4. Heritage Sustainable Energy LLC | Open Energy Information

    Open Energy Info (EERE)

    Sustainable Energy LLC Jump to: navigation, search Name: Heritage Sustainable Energy LLC Place: Traverse City, Michigan Sector: Wind energy Product: Start up wind developer in...

  5. President Obama Proclaims November National Native American Heritage Month

    Broader source: Energy.gov [DOE]

    Read the Presidential Proclamation designating November 2013 National Native American Heritage Month.

  6. Observing AAPI Heritage Month | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Observing AAPI Heritage Month Observing AAPI Heritage Month May 1, 2012 - 4:42pm Addthis Bill Valdez Bill Valdez Director of Workforce Management What are the key facts? President Obama has also appointed a historic number of highly qualified Asian Americans and Pacific Islanders to senior positions in his Administration Throughout May,the White House Initiative on Asian Americans and Pacific Islanders will be sharing the many ways in which the Obama Administration has helped the Asian American

  7. Celebrating Asian American Pacific Islander Heritage Month at the Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department | Department of Energy Celebrating Asian American Pacific Islander Heritage Month at the Energy Department Celebrating Asian American Pacific Islander Heritage Month at the Energy Department May 1, 2014 - 4:22pm Addthis Celebrating Asian American Pacific Islander Heritage Month at the Energy Department Each May we celebrate Asian American and Pacific Islander Heritage Month, honoring the accomplishments of Asian Americans, Native Hawaiians, and Pacific Islanders at the Energy

  8. Celebrating Hispanic Heritage Month at the Department of Energy |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Celebrating Hispanic Heritage Month at the Department of Energy Celebrating Hispanic Heritage Month at the Department of Energy October 14, 2014 - 2:19pm Addthis Secretary Moniz addresses Energy Department employees and contractors gathered at the 2014 Hispanic Heritage Month event, held October 14, 2014, in the Forrestal Auditorium. | Photo by Sarah Gerrity, Energy Department. Secretary Moniz addresses Energy Department employees and contractors gathered at the 2014

  9. Hanford Site Celebrates National Native American Heritage Month with

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Educational Workshops | Department of Energy Site Celebrates National Native American Heritage Month with Educational Workshops Hanford Site Celebrates National Native American Heritage Month with Educational Workshops November 28, 2012 - 12:23pm Addthis *Editor's Note: This article was originally posted in the Office of Environmental Management's EM Update, Volume 4, Issue 11, November 2012. RICHLAND, Wash. - Each November, in honor of Native American Heritage Month, the Richland Operations

  10. Honoring Hispanic Heritage Month and Renewing the American Dream |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Honoring Hispanic Heritage Month and Renewing the American Dream Honoring Hispanic Heritage Month and Renewing the American Dream September 15, 2011 - 11:03am Addthis Bill Valdez Bill Valdez Director of Workforce Management Today we kick-off Hispanic Heritage Month, celebrating under the theme of "Renewing the American Dream." The Energy Department joins the rest of the Administration in participating in a series of events that reflect various factors of the

  11. Building America Efficient Solutions for New Homes Case Study: Heritage

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Buildings, Inc., and Energy Smart Home Plans, Leland, North Carolina | Department of Energy Heritage Buildings, Inc., and Energy Smart Home Plans, Leland, North Carolina Building America Efficient Solutions for New Homes Case Study: Heritage Buildings, Inc., and Energy Smart Home Plans, Leland, North Carolina PNNL worked with North Carolina Heritage Buildings and Energy Smart Home Plans to design zero-energy ready homes that score under HERS 60 for less than 2% added cost over code

  12. A Presidential Proclamation - Asian American and Pacific Islander Heritage

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Month | Department of Energy A Presidential Proclamation - Asian American and Pacific Islander Heritage Month A Presidential Proclamation - Asian American and Pacific Islander Heritage Month May 1, 2013 - 9:25am Addthis A Presidential Proclamation - Asian American and Pacific Islander Heritage Month BY THE PRESIDENT OF THE UNITED STATES OF AMERICA A PROCLAMATION Each May, our Nation comes together to recount the ways Asian Americans and Pacific Islanders (AAPIs) helped forge our country. We

  13. Presentation 2014 AAPI Heritage Month, Department of Energy HQ | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Presentation 2014 AAPI Heritage Month, Department of Energy HQ Presentation 2014 AAPI Heritage Month, Department of Energy HQ Download the presentation from James Meng, Deputy Secretary of the Navy, on leadership, diversity, and assets of Asian American Pacific Islanders serving in government, presented on May 15, 2014 at the Department of Energy's AAPI Heritage Month in Washington DC. File Meng AAPI 2014 More Documents & Publications Diversity and Inclusion Related Documents

  14. Celebrating National Native American Heritage Month at the Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    film series for Native American Heritage Month, co-presented by the Smithsonian's National Museum of the American Indian. Employees and contractors from the Department of...

  15. Celebrating National Native American Heritage Month at the Department of Energy

    Broader source: Energy.gov [DOE]

    We celebrate Native American Heritage Month to honor Native Americans, their rich heritage, and their present accomplishments. Native Americans are innovators, entrepreneurs, leaders, and scholars,...

  16. baepgig-wabriv | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Wabash River Coal Gasification Repowering Project - Project Brief [PDF-250KB] Wabash River Coal Gasification Repowering Project Joint Venture, West Terre Haute, IN Program Publications Final Reports Wabash River Coal Gasification Repowering Project, Final Technical Report [PDF-8.2MB] (Aug 2000) Annual/Quarterly Technical Reports Wabash River Coal Gasification Repowering Project, Annual Technical Progress Reports 1995 [PDF-1.7MB] (Mar 1999) 1996 [PDF-3.8MB] (Feb 2000) 1997 [PDF-4.8MB] 1998

  17. Kickoff of Minorities in Energy Initiative and Hispanic Heritage Month Celebration

    Broader source: Energy.gov [DOE]

    The Department of Energy launched the Initiative on September 24, 2013 during National Hispanic Heritage Month.

  18. Lake Heritage, Pennsylvania: Energy Resources | Open Energy Informatio...

    Open Energy Info (EERE)

    You can help OpenEI by expanding it. Lake Heritage is a census-designated place in Adams County, Pennsylvania.1 References US Census Bureau 2005 Place to 2006 CBSA...

  19. Native American Heritage Month Celebration at the DOE Headquarters

    Broader source: Energy.gov [DOE]

    All employees are welcome to attend DOE’s celebration of Native American Heritage Month on November 20, 2013. Joining us are guest speakers Hankie Ortiz and William Mendoza.

  20. Asian American and Pacific Islander Heritage Month Program

    Broader source: Energy.gov [DOE]

    Asian Pacific American Heritage Month is a celebration of the culture, traditions, and history of Asian Americans and Pacific Islanders in the United States. Join the Energy Department for the...

  1. Asian American and Pacific Islander Heritage Women @ Energy | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Asian American and Pacific Islander Heritage Women @ Energy Asian American and Pacific Islander Heritage Women @ Energy May 3, 2013 - 11:49am Addthis Xin Sun 1 of 12 Xin Sun Creativity, insight, and application are the hallmarks of Dr. Xin Sun's applied mechanics and computational materials research at Pacific Northwest National Laboratory. Her advances in lightweight and high-strength materials (including steels) and modeling are vital to energy efficiency and renewable energy and

  2. 2013 Asian American & Pacific Islander Heritage Month Resources and Theme |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 2013 Asian American & Pacific Islander Heritage Month Resources and Theme 2013 Asian American & Pacific Islander Heritage Month Resources and Theme April 3, 2013 - 1:43pm Addthis Save the date for the Asian Pacific American Heritage Month Family Day at the Smithsonian! This year it will be at the National Museum of American History on Saturday, May 4, 2013. More details to come. Save the date for the Asian Pacific American Heritage Month Family Day at the

  3. Ion beam analysis in cultural heritage studies: Milestones and perspectives

    SciTech Connect (OSTI)

    Dran, Jean-Claude; Calligaro, Thomas

    2013-07-18

    For three decades, ion beam analysis (IBA) in external mode was considered as the best choice for the characterisation of cultural heritage materials, as it combines excellent analytical performance and non-invasive character. However, in recent years, other analytical techniques arose as serious competitors, such as those based on synchrotron radiation (X-ray absorption, fluorescence or diffraction) or those using portable instruments (XRF, micro-Raman). It is shown that nevertheless IBA remains unmatched thanks to two unique features, namely the analysis of light elements and the high-resolution 3D chemical imaging.

  4. Assessment of contaminant levels and trophic relations at a World Heritage Site by measurements in a characteristic shorebird species

    SciTech Connect (OSTI)

    Schwemmer, Philipp; Covaci, Adrian; Das, Krishna; Lepoint, Gilles; Adler, Sven; Garthe, Stefan

    2015-01-15

    The River Elbe is responsible for influxes of contaminants into the Wadden Sea World Heritage Site. We investigated levels of polychlorinated biphenyls (PCBs), oxychlordane (OxC), hexachlorobenzene (HCB), hexachlorocyclohexanes (α-, β-, γ-HCHs), dichlorodiphenyltrichloroethane (DDT) and its metabolites, and polybrominated diphenyl ethers (PBDEs) in blood and feathers from Eurasian oystercatchers (Haematopus ostralegus; n=28) at the Elbe and compared it with a non-riverine site about 90 km further north. (1) Mean levels of all contaminants in feathers and serum were significantly higher at the river (∑PCBs: 27.6 ng/g feather, 37.0 ng/ml serum; ∑DDTs: 5.3 ng/g feather, 4.4 ng/ml serum) compared with the non-riverine site (∑PCBs: 6.5 ng/g feather, 1.2 ng/ml serum; ∑DDTs: 1.4 ng/g feather, 0.5 ng/ml serum). Mean ∑HCH and HCB levels were <1.8 ng/g in feather and <1.8 ng/ml in serum at both sites. (2) Levels of most detectable compounds in serum and feathers were significantly related, but levels were not consistently higher in either tissue. (3) There was no significant relationship between trophic level in individual oystercatchers (expressed as δ15N) or the degree of terrestrial feeding (expressed as δ13C) and contaminant loads. (4) PBDEs were not detected in significant amounts at either site. The results of this study indicate that the outflow from one of Europe′s largest river systems is associated with significant historical contamination, reflected by the accumulation of contaminants in body tissues in a coastal benthivore predator. - Highlights: • Contaminants in Oystercatchers from the Elbe river and a non-riverine site were measured. • Mean levels of contaminants were higher at the river than at the non-riverine site. • Levels of most contaminants in serum and feathers were significantly related. • No relationship between trophic level (δ15N) and contaminant level was found. • One of Europe′s largest river systems is associated with major historical contamination.

  5. MCA 22-3-435 - Report Discovered Heritage Properties or Paleontologica...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: MCA 22-3-435 - Report Discovered Heritage Properties or Paleontological RemainsLegal Abstract...

  6. A Platinum Anniversary for U.S. Atomic Heritage - EM's Historic Manhattan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Sites Gain International Media Attention | Department of Energy A Platinum Anniversary for U.S. Atomic Heritage - EM's Historic Manhattan Project Sites Gain International Media Attention A Platinum Anniversary for U.S. Atomic Heritage - EM's Historic Manhattan Project Sites Gain International Media Attention September 1, 2012 - 12:00pm Addthis WASHINGTON, D.C. - Traditionally, a platinum anniversary marks 70-years. The Manhattan roject legacy reached that special milestone this

  7. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessment of Radionuclide Monitoring in the CSRA Savannah River NERP Research ... Upcoming Seminars The Savannah River Ecology Laboratory is a research unit of the ...

  8. Savannah River Field Office | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Savannah River Field Office

  9. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in 1997 and replaced with two other areas, both located in the Savannah River swamp. ... on the natural levy that parallels the Savannah River. Area: 1 2 3 4 5 6 7 8 9 10 11 ...

  10. River Corridor Achievements

    Broader source: Energy.gov [DOE]

    Washington Closure Hanford and previous contractors have completed much of the cleanup work in the River Corridor, shown here.

  11. The Montana Rivers Information System: Edit/entry program user`s manual

    SciTech Connect (OSTI)

    Not Available

    1992-07-01

    The Montana Rivers Information System (MRIS) was initiated to assess the state`s fish, wildlife, and recreation value; and natural cultural and geologic features. The MRIS is now a set of data bases containing part of the information in the Natural Heritage Program natural features and threatened and endangered species data bases. The purpose of this User`s Manual is to: (1) describe to the user how to maintain the MRIS database of their choice by updating, changing, deleting, and adding records using the edit/entry programs; and (2) provide to the user all information and instructions necessary to complete data entry into the MRIS databases.

  12. Montana Rivers Information System : Edit/Entry Program User's Manual.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Montana Department of Fish, Wildlife and Parks

    1992-07-01

    The Montana Rivers Information System (MRIS) was initiated to assess the state`s fish, wildlife, and recreation value; and natural cultural, and geologic features. The MRIS is now a set of data bases containing part of the information in the Natural Heritage Program natural features and threatened and endangered species data bases and comprises of the Montana Interagency Stream Fisheries Database; the MDFWP Recreation Database; and the MDFWP Wildlife Geographic Information System. The purpose of this User`s Manual is to describe to the user how to maintain the MRIS database of their choice by updating, changing, deleting, and adding records using the edit/entry programs; and to provide to the user all information and instructions necessary to complete data entry into the MRIS databases.

  13. Lower Colorado River Authority | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Lower Colorado River Authority's communications requirements

  14. Office of River Protection - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of River Protection Office of River Protection Office of River Protection Office of River Protection Email Email Page | Print Print Page |Text Increase Font Size Decrease...

  15. New Whole-House Solutions Case Study: Heritage Buildings, Inc., and Energy Smart Home Plans, Leland, North Carolina

    SciTech Connect (OSTI)

    none,

    2012-10-01

    PNNL worked with North Carolina Heritage Buildings and Energy Smart Home Plans to design zero-energy ready homes that score under HERS 60 for less than 2% added cost over code construction.

  16. Savannah River National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Savannah River National Laboratory srnl.doe.gov SRNL is a DOE National Laboratory operated by Savannah River Nuclear Solutions. At a glance 'Tin whiskers' suppression method Researchers at the Savannah River National Laboratory (SRNL) have identified a treatment method that slows or prevents the formation of whiskers in lead-free solder. Tin whiskers spontaneously grow from thin films of tin, often found in microelectronic devices in the form of solders and platings. Background This problem was

  17. River and Plateau Committee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy River Turbine Provides Clean Energy to Remote Alaskan Village River Turbine Provides Clean Energy to Remote Alaskan Village August 18, 2015 - 10:36am Addthis River Turbine Provides Clean Energy to Remote Alaskan Village Alison LaBonte Marine and Hydrokinetic Technology Manager To date, Ocean Renewable Power Company (ORPC) is the only company to have built, operated and delivered power to a utility grid from a hydrokinetic tidal project, and to a local microgrid from a hydrokinetic

  18. Great River (1973)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  19. River of Power (1987)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  20. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of bottomland hardwoodfloodplain forest communities of a southern river swamp system. ... or urban waste discharge, or power plant cooling effluents. Area: 1 2 3 4 5 6 7 ...

  1. Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    location of the Savannah River Ecology Laboratory, is one of the original ten SREL habitat reserves and was selected to complement the old-field habitatplant succession studies ...

  2. about Savannah River National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The EDM capability at the Savannah River National Laboratory (SRNL) is unique to the Savannah River Site. It allows for very fine, precise cutting of metal without destroying ...

  3. Office of River Protection (ORP) and Washingotn River Protection Solutions,

    Energy Savers [EERE]

    LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project | Department of Energy River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project The Mission of the Office of River Protection is to safely retrieve and treat Hanford's tank waste and close the Tank

  4. River and Harbors Act

    Broader source: Energy.gov [DOE]

    Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) prohibits the unauthorized obstruction or alteration of any navigable water of the United States.

  5. Savannah river site

    National Nuclear Security Administration (NNSA)

    at the Savannah River Site (SRS) to supply and process tritium, a radioactive form of hydrogen that is a vital component of nuclear weapons. SRS loads tritium and non-tritium...

  6. Sioux River Ethanol LLC | Open Energy Information

    Open Energy Info (EERE)

    River Ethanol LLC Jump to: navigation, search Name: Sioux River Ethanol LLC Place: Hudson, South Dakota Zip: 57034 Product: Farmer owned ethanol producer, Sioux River Ethanol is...

  7. Savannah River Site | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Savannah River Site FY 2015 FY 2015 Performance Evaluation Plan, Savannah River Nuclear Solitions, LLC FY 2014 FY 2014 Performance Evaluation Report, Savannah River Nuclear ...

  8. Raft River Geothermal Facility | Open Energy Information

    Open Energy Info (EERE)

    Facility Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Raft River Geothermal Facility General Information Name Raft River Geothermal Facility Facility Raft River...

  9. Sky River Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    River Wind Farm Jump to: navigation, search Name Sky River Wind Farm Facility Sky River Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner...

  10. Wing River Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search Name Wing River Wind Farm Facility Wing River Wind Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Wing River...

  11. Flambeau River Biofuels | Open Energy Information

    Open Energy Info (EERE)

    Flambeau River Biofuels Jump to: navigation, search Name: Flambeau River Biofuels Place: Park Falls, Wisconsin Sector: Biomass Product: A subsidiary of Flambeau River Papers LLC...

  12. Savannah River Site Waste Disposition Project

    Office of Environmental Management (EM)

    Terrel J. Spears Assistant Manager Waste Disposition Project DOE Savannah River Operations Office Savannah River Site Savannah River Site Waste Disposition Project Waste ...

  13. Savannah River | Department of Energy

    Energy Savers [EERE]

    River Savannah River Following are compliance agreements for the Savannah River Site. Also included are short summaries of the agreements. PDF icon Natural Resources Defense Council Consent Decree, May 26, 1988 PDF icon Natural Resources Defense Council Consent Decree, May 26, 1988 Summary PDF icon Savannah River Site Consent Order 99-155-W, October 11, 1999 PDF icon Savannah River Site Consent Order 99-155-W, October 11, 1999 Summary PDF icon Savannah River Site Consent Order 85-70-SW, November

  14. THE AEROSPACE CORPORATION

    Office of Legacy Management (LM)

    ... BE INCLUDED IN FUSRAP. CONTRACT STANARD OIL OF IIANA IN B-10 PLANT DEVELOPMENT (BOlRN) ... WABASH RIVER ORDNANCE WORKS NEWF9T IN HEAVY WATER PLANT INFORMATION COLLECTED INDICATE ...

  15. Albany, OR * Fairbanks, AK * Morgantown...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    run at the Eastman Chemical Company's Kingsport, TN, site; at Tampa Electric Company's Polk Power Station in Lakeland, FL; and at the Wabash River Power Station in Terre Haute,...

  16. Most Viewed Documents for Power Generation and Distribution:...

    Office of Scientific and Technical Information (OSTI)

    Gas Turbine Exhaust Diffuser Norris, Thomas R. (2009) 18 Electric power substation capital costs Dagle, J.E.; Brown, D.R. (1997) 17 WABASH RIVER COAL GASIFICATION REPOWERING ...

  17. Schlumberger soundings in the Upper Raft River and Raft River...

    Open Energy Info (EERE)

    soundings in the Upper Raft River and Raft River Valleys, Idaho and Utah Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Schlumberger soundings in the...

  18. Lower Colorado River Authority | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    from Lower Colorado River Authority on Smart Grid communications requirements

  19. Reese River Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    River Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Reese River Geothermal Project Project Location Information...

  20. Project Management Institute Highlights Savannah River Nuclear...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Management Institute Highlights Savannah River Nuclear Solutions in Publication Project Management Institute Highlights Savannah River Nuclear Solutions in Publication ...

  1. Gasification | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Gasification Gasification The Wabash River Clean Coal Power Plant The Wabash River Clean Coal Power Plant Gasification Technology R&D Coal gasification offers one of the most versatile and clean ways to convert coal into electricity, hydrogen, and other valuable energy products. Coal gasification electric power plants are now operating commercially in the United States and in other nations, and many experts predict that coal gasification will be at the heart of future generations of clean

  2. Gasoline Hybrid Electric Delivery Vehicles Reduce Tailpipe Emissions While

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Gasification Gasification The Wabash River Clean Coal Power Plant The Wabash River Clean Coal Power Plant Gasification Technology R&D Coal gasification offers one of the most versatile and clean ways to convert coal into electricity, hydrogen, and other valuable energy products. Coal gasification electric power plants are now operating commercially in the United States and in other nations, and many experts predict that coal gasification will be at the heart of future generations of clean

  3. Ecotoxicology | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Savannah River NERP Research Opportunities Field Sites Data Research Facilities Low Dose Irradiation Facility Tritium Irrigation Facility Microsatellite Development Education ...

  4. Savannah River Site Robotics

    SciTech Connect (OSTI)

    2010-01-01

    Meet Sandmantis and Frankie, two advanced robotic devices that are key to cleanup at Savannah River Site. Sandmantis cleans hard, residual waste off huge underground storage tanks. Frankie is equipped with unique satellite capabilities and sensing abilties that can determine what chemicals still reside in the tanks in a cost effective manner.

  5. Savannah River Site Robotics

    ScienceCinema (OSTI)

    None

    2012-06-14

    Meet Sandmantis and Frankie, two advanced robotic devices that are key to cleanup at Savannah River Site. Sandmantis cleans hard, residual waste off huge underground storage tanks. Frankie is equipped with unique satellite capabilities and sensing abilties that can determine what chemicals still reside in the tanks in a cost effective manner.

  6. Wabash Valley Power Assn, Inc | Open Energy Information

    Open Energy Info (EERE)

    Utility Id 40211 Utility Location Yes Ownership C NERC Location RFC,SERC NERC RFC Yes RTO PJM Yes ISO MISO Yes Activity Generation Yes Activity Transmission Yes Activity Buying...

  7. Wabash County, Illinois: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    lse,"poi":true,"imageoverlays":,"markercluster":false,"searchmarkers":"","locations":"text":"","title":"","link":null,"lat":38.4226484,"lon":-87.8156715,"alt":0,"address":"","i...

  8. Hood River Passive House

    SciTech Connect (OSTI)

    Hales, D.

    2013-03-01

    The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to reduce home energy use by 30%-50% (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project.

  9. Voluntary Protection Program Onsite Review, Savannah River Nuclear...

    Office of Environmental Management (EM)

    River Nuclear Solutions, Llc Savannah River Site - October 2014 Voluntary Protection Program Onsite Review, Savannah River Nuclear Solutions, Llc Savannah River Site - October 2014 ...

  10. EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    81: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River ...

  11. Look to the River Columbia River Opens New Opportunities for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  12. about Savannah River National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Gas Transfer Systems and Reservoir Development Gas Transfer Systems and Reservoir Development The Savannah River Site (SRS) is rich in history for its involvement in the nation's nuclear defense program. For over 50 years, SRS and the Savannah River National Laboratory (SRNL) have developed the expertise necessary to be the premier laboratory for tritium processing and its relation to new reservoir design. SRNL is the bridge between the weapon Design Agencies and the Savannah River Tritium

  13. Smith River Rancheria- 2006 Project

    Broader source: Energy.gov [DOE]

    Smith River Rancheria has a strong commitment to becoming energy self-sufficient, reduce their energy costs, and stimulate economic development in the community.

  14. RiverHeath Appleton, WI

    Office of Energy Efficiency and Renewable Energy (EERE)

    The goal of the project is to produce a closed loop neighborhood-wide geothermal exchange system using the river as the source of heat exchange.

  15. Employment | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Openings are posted on the UGA Human Resources website. To search for employment opportunities at SREL, select Department 267 (Savannah River Ecology Laboratory). UGA HR...

  16. OFFICE OF RIVER PROTECTION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1-6-60 Richland, Washington 99352 SEP 3 0 2013 13 -CPM-0262 Mr. Charles A. Simpson, Contracts Manager Washington River Protection Solutions LLC 2440 Stevens Center Place Richland, Washington 99354 Mr. Simpson: CONTRACT NO. DE-AC27-08RVI4800 - TRANSMITTAL OF CONTRACT MODIFICATION 231 The purpose of this letter is to transmit the fully-executed Contract Modification 23 1. This modification revises the contract price for the base contract period and updates Section J, Attachment J.4, Performance

  17. River and Plateau Committee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 2011) Page 1 Area RAP Committee Area of Interest Issue Manager(s) (*denotes lead) Other interested committee members Focus/Product For FY2012 Framing Questions/Issues (Articulated by Issue Managers) Cross- cutting River Corridor 100 & 300 Areas * 100 B/C Area * 100 K Area * 100 N Area * 100 D & H Areas * 100 F Area * 300 Area Shelley Cimon Dale Engstrom* Liz Mattson Jean Vanni Gerry Pollet Bob Suyama Wade Riggsbee 6 RODs RI/FS and Proposed Plans to be issued between now &

  18. River and Plateau Committee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2/15 River and Plateau Committee Priorities for advice on FY17 budget Not in priority order, numbering refers to last year's related advice points, per DOE response  (#1) The Board strongly urges DOE-Headquarters (HQ) to request full funding from Congress to meet all legal requirements of the ongoing cleanup work in FY 2016 and 2017 in addition to the following specific requests.  (#5) The Board advises DOE-RL to restore funding for removal and treatment of thousands of stored containers

  19. North Sky River | Open Energy Information

    Open Energy Info (EERE)

    Sky River Jump to: navigation, search Name North Sky River Facility North Sky River Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra...

  20. Hood River Passive House

    SciTech Connect (OSTI)

    Hales, D.

    2014-01-01

    The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to reduce home energy use by 30%-50% (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project. The design includes high R-Value assemblies, extremely tight construction, high performance doors and windows, solar thermal DHW, heat recovery ventilation, moveable external shutters and a high performance ductless mini-split heat pump. Cost analysis indicates that many of the measures implemented in this project did not meet the BA standard for cost neutrality. The ductless mini-split heat pump, lighting and advanced air leakage control were the most cost effective measures. The future challenge will be to value engineer the performance levels indicated here in modeling using production based practices at a significantly lower cost.

  1. Hood River Passive House

    SciTech Connect (OSTI)

    Hales, David

    2014-01-01

    The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to "reduce home energy use by 30%-50% (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project. The design includes high R-Value assemblies, extremely tight construction, high performance doors and windows, solar thermal DHW, heat recovery ventilation, moveable external shutters and a high performance ductless mini-split heat pump. Cost analysis indicates that many of the measures implemented in this project did not meet the BA standard for cost neutrality. The ductless mini-split heat pump, lighting and advanced air leakage control were the most cost effective measures. The future challenge will be to value engineer the performance levels indicated here in modeling using production based practices at a significantly lower cost.

  2. Wild and Scenic Rivers | Open Energy Information

    Open Energy Info (EERE)

    Scenic Rivers Jump to: navigation, search Retrieved from "http:en.openei.orgwindex.php?titleWildandScenicRivers&oldid612228" Feedback Contact needs updating Image...

  3. Green River Biodiesel Incorporated | Open Energy Information

    Open Energy Info (EERE)

    River Biodiesel Incorporated Jump to: navigation, search Name: Green River Biodiesel Incorporated Place: Houston, Texas Zip: 77056 Product: Biodiesel project developer and...

  4. Independent Activity Report, Savannah River Remediation - July...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Activity Report, Savannah River Remediation - July 2010 July 2010 Savannah River Operations Office Integrated Safety Management System Phase II Verification Review of ...

  5. Independent Oversight Inspection, Savannah River Site Office...

    Energy Savers [EERE]

    Office - December 2009 Independent Oversight Inspection, Savannah River Site Office - December 2009 December 2009 Inspection of Nuclear Safety at the Savannah River Site Office and ...

  6. Savannah River Remediation (SRR) Expanded Staff Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Savannah River Remediation Delivering the Mission Dave Olson President and Project Manager ... Liquid Waste Operations contractor Savannah River Remediation LLC * Began work in ...

  7. Beasley Lab | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    These studies are being conducted in habitats on the Savannah River Site where the ... activities on the Savannah River Site can expose wildlife that use contaminated areas. ...

  8. Savannah River Analytical Laboratories Achieve International...

    National Nuclear Security Administration (NNSA)

    Savannah River Analytical Laboratories Achieve International Standard Accreditation Tuesday, September 8, 2015 - 12:55pm Savannah River National Laboratory's FH Analytical ...

  9. Educational Materials | Savannah River Ecology Laboratory Environmenta...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Snapshots The Savannah River Site National Environmental Research Park The History of Radioecology Research at the Savannah River Ecology Laboratory Gray Foxes of the ...

  10. Savannah river site | National Nuclear Security Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Savannah river site NNSA team members make a living in nuclear security, make a difference ... Last HEU Removed from Switzerland under NNSA Collaboration Savannah River Analytical ...

  11. Independent Oversight Inspection, Savannah River Site - January...

    Energy Savers [EERE]

    Independent Oversight Inspection, Savannah River Site - January 2010 January 2010 Inspection of Emergency Management at the Savannah River Site This report provides the results of ...

  12. Flambeau River Biofuels Demonstration-Scale Biorefinery

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Wisconsin (NewPage Corporation in Wisconsin Rapids and Flambeau River Papers, LLC in Park Falls). NewPage and Flambeau River have demonstrated successful collaboration on...

  13. Grand River Dam Authority | Open Energy Information

    Open Energy Info (EERE)

    River Dam Authority Place: Oklahoma Phone Number: 918-256-5545 Website: www.grda.com Twitter: @okgrda Facebook: https:www.facebook.compagesGrand-River-Dam-Authority...

  14. Beijing Haohua Rivers International Water Engineering Consulting...

    Open Energy Info (EERE)

    Haohua Rivers International Water Engineering Consulting Co Ltd Jump to: navigation, search Name: Beijing Haohua Rivers International Water Engineering Consulting Co.Ltd. Place:...

  15. River Hydrokinetic Resource Atlas | Open Energy Information

    Open Energy Info (EERE)

    dress":"","icon":"","group":"","inlineLabel":"","visitedicon":"" Hide Map Language: English River Hydrokinetic Resource Atlas Screenshot References: EPRI1 River Atlas2 The...

  16. Independent Oversight Activity Report, Savannah River Site -...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - February 2014 Independent Oversight Activity Report, Savannah River Site - February 2014 February 2014 Operational Awareness Visit of the Savannah River Site...

  17. Withlacoochee River Elec Coop | Open Energy Information

    Open Energy Info (EERE)

    Withlacoochee River Elec Coop Jump to: navigation, search Name: Withlacoochee River Elec Coop Place: Florida Phone Number: 352-567-5133 Website: www.wrec.net Twitter: https:...

  18. Categorical Exclusion Determinations: Savannah River Operations...

    Office of Environmental Management (EM)

    Savannah River Operations Office Categorical Exclusion Determinations: Savannah River ... Install Concrete Block Bins for Additional Rock Storage at MOX Batch Plant CX(s) Applied: ...

  19. Savannah River Remediation, College Create Job Opportunities...

    Office of Environmental Management (EM)

    Remediation, College Create Job Opportunities for Graduates Savannah River Remediation, ... "With ongoing missions at the Savannah River Site and construction at Plant Vogtle and ...

  20. Kings River Conservation Dist | Open Energy Information

    Open Energy Info (EERE)

    Kings River Conservation Dist Jump to: navigation, search Name: Kings River Conservation Dist Place: California Phone Number: 559-237-5567 Website: www.krcd.org Facebook: https:...

  1. Voluntary Protection Program Onsite Review, Washington River...

    Energy Savers [EERE]

    Washington River Protection Solutions, LLC, Hanford - Feb 2014 Voluntary Protection Program Onsite Review, Washington River Protection Solutions, LLC, Hanford - Feb 2014 February...

  2. Enforcement Letter, Westinghouse Savannah River Company- April 19, 2004

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Employee Reprisal at the Savannah River Site

  3. Enforcement Letter, Westinghouse Savannah River Company- November 14, 2003

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Criticality Safety Violations at the Savannah River Site

  4. Recent developments in atomic/nuclear methodologies used for the study of cultural heritage objects

    SciTech Connect (OSTI)

    Appoloni, Carlos Roberto

    2013-05-06

    Archaeometry is an area established in the international community since the 60s, with extensive use of atomic-nuclear methods in the characterization of art, archaeological and cultural heritage objects in general. In Brazil, however, until the early '90s, employing methods of physics, only the area of archaeological dating was implemented. It was only after this period that Brazilian groups became involved in the characterization of archaeological and art objects with these methodologies. The Laboratory of Applied Nuclear Physics, State University of Londrina (LFNA/UEL) introduced, pioneered in 1994, Archaeometry and related issues among its priority lines of research, after a member of LFNA has been involved in 1992 with the possibilities of tomography in archaeometry, as well as the analysis of ancient bronzes by EDXRF. Since then, LFNA has been working with PXRF and Portable Raman in several museums in Brazil, in field studies of cave paintings and in the laboratory with material sent by archaeologists, as well as carrying out collaborative work with new groups that followed in this area. From 2003/2004 LAMFI/DFN/IFUSP and LIN/COPPE/UFRJ began to engage in the area, respectively with methodologies using ion beams and PXRF, then over time incorporating other techniques, followed later by other groups. Due to the growing number of laboratories and institutions/archaeologists/conservators interested in these applications, in may 2012 was created a network of available laboratories, based at http://www.dfn.if.usp.br/lapac. It will be presented a panel of recent developments and applications of these methodologies by national groups, as well as a sampling of what has been done by leading groups abroad.

  5. Concept Paper Savannah River Nuclear Solutions, LLC Savannah River Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Paper Savannah River Nuclear Solutions, LLC Savannah River Site Aiken, SC 29808 Michael S. Navetta, PE Manager- Energy Park Initiative (803) 952-8806 michael.navetta@srs.gov U.S. EnergyFreedomCenter PREDECISIONAL DRAFT Today We Can Start To Unshackle America Decades of debate for ending America's dependence on foreign fossil fuels, climate change and environmentally positive energy has produced a myriad of technologies that independently offer a partial solution. Applying existing technologies

  6. Annual review of cultural resource investigations by the Savannah River Archaeological Research Program. Fiscal year 1995

    SciTech Connect (OSTI)

    Brooks, M.J.; Brooks, R.D.; Sassaman, K.E.; Crass, D.C.

    1995-10-01

    The Savannah River Archaeological Research Program (SRARP) continued through FY95 with the United States Department of Energy to fulfill a threefold mission of cultural resource management, research, and public education at the Savannah River Site. Over 2,300 acres of land on the SRS came under cultural resources review in FY95. This activity entailed 30 field surveys, resulting in the recording of 86 new sites. Twenty-two existing sites within survey tract boundaries were revisited to update site file records. Research conducted by SRARP was reported in 11 papers and monographs published during FY95. SRARP staff also presented research results in 18 papers at professional meetings. Field research included several testing programs, excavations, and remote sensing at area sites, as well as data collection abroad. Seven grants were acquired by SRARP staff to support off-site research. In the area of heritage education, the SRARP expanded its activities in FY95 with a full schedule of classroom education, public outreach, and on-site tours. Volunteer excavations at the Tinker Creek site were continued with the Augusta Archaeological Society and other avocational groups, and other off-site excavations provided a variety of opportunities for field experience. Some 80 presentations, displays and tours were provided for schools, historical societies, civic groups, and environmental and historical awareness day celebrations. Additionally, SRARP staff taught four anthropology courses at area colleges.

  7. about Savannah River National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In an effort to ensure the safety of the nation's nuclear weapons stockpile, the Savannah ... Operated by Savannah River Nuclear Solutions for the U.S. Department of Energy near Aiken, ...

  8. Raft River Idaho Magnetotelluric Data

    SciTech Connect (OSTI)

    Gregory Nash

    2015-05-13

    Raw magnetotelluric (MT) data covering the geothermal system at Raft River, Idaho. The data was acquired by Quantec Geoscience. This is a zipped file containing .edi raw MT data files.

  9. Savannah River Site | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Site Savannah River Site Savannah River Site | June 2011 Aerial View Savannah River Site | June 2011 Aerial View Savannah River Site (SRS) has mission responsibilities in nuclear weapons stockpile stewardship by ensuring the safe and reliable management of tritium resources; by contributing to the stockpile surveillance program; and by assisting in the development of alternatives for large-scale pit disassembly/conversion capability. SRS also manages excess nuclear materials and

  10. Savannah River Site | Department of Energy

    Office of Environmental Management (EM)

    Savannah River Site Savannah River Site Savannah River Site | June 2011 Aerial View Savannah River Site | June 2011 Aerial View Savannah River Site (SRS) has mission responsibilities in nuclear weapons stockpile stewardship by ensuring the safe and reliable management of tritium resources; by contributing to the stockpile surveillance program; and by assisting in the development of alternatives for large-scale pit disassembly/conversion capability. SRS also manages excess nuclear materials and

  11. Dayao County Yupao River BasDayao County Yupao River Basin Hydro...

    Open Energy Info (EERE)

    Dayao County Yupao River BasDayao County Yupao River Basin Hydro electricity Development Co Ltd in Jump to: navigation, search Name: Dayao County Yupao River BasDayao County Yupao...

  12. PP-366 Twin Rivers Paper Company, Inc. | Department of Energy

    Office of Environmental Management (EM)

    6 Twin Rivers Paper Company, Inc. PP-366 Twin Rivers Paper Company, Inc. Presidential Permit authorizing Twin Rivers Paper Company, Inc. to construct, operate, and maintain ...

  13. BLM Humboldt River Field Office | Open Energy Information

    Open Energy Info (EERE)

    River Field Office Jump to: navigation, search Name: BLM Humboldt River Field Office Abbreviation: Humboldt River Address: 5100 E. Winnemucca Blvd. Place: Winnemucca, Nevada Zip:...

  14. EA-273 Rainy River Energy Corporation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rainy River Energy Corporation EA-273 Rainy River Energy Corporation Order authorizing Rainy River Energy Corporation to export electric energy to Canada. PDF icon EA-273 Rainy ...

  15. PIA - Savannah River Operations Office File and Print Services...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    File and Print Services PIA - Savannah River Operations Office File and Print Services PIA - Savannah River Operations Office File and Print Services PDF icon PIA - Savannah River ...

  16. PIA - DOE Savannah River Operations Office PRISM System | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Operations Office PRISM System PIA - DOE Savannah River Operations Office PRISM System PIA - DOE Savannah River Operations Office PRISM System PDF icon PIA - DOE ...

  17. Voluntary Protection Program Onsite Review, Savannah River Remediation...

    Office of Environmental Management (EM)

    River Remediation, Llc, Liquid Waste Contract, Savannah River Site - November 2014 Voluntary Protection Program Onsite Review, Savannah River Remediation, Llc, Liquid Waste ...

  18. Savannah River Site - L-Area Southern Groundwater | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    L-Area Southern Groundwater Savannah River Site - L-Area Southern Groundwater January 1, ... InstallationName, State: Savannah River Site, SC Responsible DOE Office: Savannah River ...

  19. Independent Activity Report, Savannah River Site - March 2013...

    Office of Environmental Management (EM)

    Savannah River Site - March 2013 Independent Activity Report, Savannah River Site - March 2013 March 2013 Oversight Scheduling an Operational Awareness at the Savannah River Site ...

  20. Savannah River Site - R-Area Groundwater Operable Unit | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    R-Area Groundwater Operable Unit Savannah River Site - R-Area Groundwater Operable Unit ... InstallationName, State: Savannah River Site, SC Responsible DOE Office: Savannah River ...

  1. Snake River Plain Geothermal Region | Open Energy Information

    Open Energy Info (EERE)

    Survey At Snake River Plain Region (DOE GTP) Micro-Earthquake At Snake River Plain Geothermal Region (1976) Reflection Survey At Snake River Plain Region (DOE GTP)...

  2. Independent Oversight Activity Report, Office of River Protection...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of River Protection - May 2013 Independent Oversight Activity Report, Office of River Protection - May 2013 May 2013 Operational Awareness Visit at the Office of River...

  3. Savannah River National Laboratory (SRNL) | Open Energy Information

    Open Energy Info (EERE)

    (Redirected from Savannah River National Laboratory) Jump to: navigation, search Logo: Savannah River National Laboratory Name: Savannah River National Laboratory Place: Aiken,...

  4. Green River, Utah, Disposal Site Fact Sheet

    Office of Legacy Management (LM)

    Green River, Utah, Disposal Site This fact sheet provides information about the Uranium Mill Tailings Radiation Control Act of 1978 Title I disposal site near Green River, Utah. This site is managed by the U.S. Department of Energy Office of Legacy Management. Location of the Green River, Utah, Disposal Site Site Description and History The Green River disposal site is about 0.5 mile east of the Green River and 1.5 miles southeast of the city of Green River, Utah. The site consists of an

  5. THE SNAKE RIVER PLAIN AQUIFER THE SNAKE RIVER PLAIN AQUIFER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    aquifer THE INL & THE SNAKE RIVER PLAIN AQUIFER THE SNAKE RIVER PLAIN AQUIFER underneath the Idaho National Laboratory is one of the most productive groundwater resources in the U.S. Each year about 2 million acre-feet of water is drawn from the aquifer. Approximately 95 percent of the water withdrawn from the aquifer is used for irrigation, 3 per- cent for domestic water, and 2 percent for industrial purposes. The aquifer is the primary water source for more than 280,000 people in

  6. Concept Paper Savannah River Nuclear Solutions, LLC Savannah River Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Paper Savannah River Nuclear Solutions, LLC Savannah River Site Aiken, SC 29808 Michael S. Navetta, PE Manager- Energy Park Initiative (803) 952-8806 michael.navetta@srs.gov DRAFT Small Modular Reactor Demonstration Complex "One of the most promising areas is small modular reactors (SMRs). If we can develop this technology in the U.S. and build these reactors with American workers, we will have a key competitive edge. Our choice is clear: Develop these technologies today or import them

  7. Flambeau_River_Biofuels.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FlambeauRiverBiofuels.pdf FlambeauRiverBiofuels.pdf FlambeauRiverBiofuels.pdf PDF icon FlambeauRiverBiofuels.pdf More Documents & Publications Pacific Ethanol, Inc Flambeau ...

  8. Grays River Watershed Geomorphic Analysis

    SciTech Connect (OSTI)

    Geist, David R.

    2005-04-30

    This investigation, completed for the Pacific Northwest National Laboratory (PNNL), is part of the Grays River Watershed and Biological Assessment commissioned by Bonneville Power Administration under project number 2003-013-00 to assess impacts on salmon habitat in the upper Grays River watershed and present recommendations for habitat improvement. This report presents the findings of the geomorphic assessment and is intended to support the overall PNNL project by evaluating the following: 􀂃 The effects of historical and current land use practices on erosion and sedimentation within the channel network 􀂃 The ways in which these effects have influenced the sediment budget of the upper watershed 􀂃 The resulting responses in the main stem Grays River upstream of State Highway 4 􀂃 The past and future implications for salmon habi

  9. EA-2000: Proposed Land Transfer to Develop a General Aviation Airport at the East Tennessee Technology Park Heritage Center, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    DOE is preparing an EA to assess potential environmental impacts of the proposed land transfer to the Metropolitan Knoxville Airport Authority for the development of a general aviation airport at the East Tennessee Technology Park Heritage Center, in Oak Ridge, Tennessee.

  10. Platte River Power Authority | Open Energy Information

    Open Energy Info (EERE)

    search Name: Platte River Power Authority Place: Colorado Website: www.prpa.org Facebook: https:www.facebook.comPlatteRiverPower Outage Hotline: 1-888-748-5113 References:...

  11. Savannah River Site | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Savannah River Site NNSA operates facilities at the Savannah River Site (SRS) to supply and process tritium, a radioactive form of hydrogen that is a vital component of nuclear ...

  12. Beasley Lab | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AND DISEASE DYNAMICS OF WILD PIGS ON THE SAVANNAH RIVER SITE SREL Collaborators: Jim ... At the Savannah River Site alone between 30 and 40 pigs are struck by vehicles each year, ...

  13. Research | Savannah River National Environmental Park

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Over the years research on the Savannah River NERP has provided many insights into human ... research on the SRS and the establishment of the Savannah River Ecology Laboratory (SREL). ...

  14. Savannah River Site - TNX | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Site - TNX January 1, 2013 - 12:00pm Addthis US Department of Energy Groundwater Database Groundwater Master Report InstallationName, State: Savannah River Site, SC ...

  15. Overview | Savannah River National Environmental Park

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Park Overview The Savannah River Site is an 803-km2 Department of Energy (DOE) facility ... of South Carolina, near Aiken, SC. The site is bordered on one side by the Savannah River. ...

  16. New Savannah River Site Deputy Manager Named

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – DOE’s Savannah River Operations Office selected Terrel “Terry” J. Spears as the deputy manager of the Savannah River Site (SRS) this month.

  17. Preliminary Notice of Violation, Westinghouse Savannah River...

    Broader source: Energy.gov (indexed) [DOE]

    River Company - EA-97-11 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 98-09 Preliminary Notice of Violation, Kaiser-Hill Company, LLC - EA-1999-06...

  18. An Inside Look at River Corridor

    Broader source: Energy.gov [DOE]

    In the seventh chapter of The Handford Story, the Energy Department takes a look at the River Corridor -- a 50-mile stretch of the Columbia River that flows through the Hanford site in southeast...

  19. Red River Biodiesel Ltd | Open Energy Information

    Open Energy Info (EERE)

    Ltd Jump to: navigation, search Name: Red River Biodiesel, Ltd. Place: Houston, Texas Zip: 77006 Product: Red River operates a biodiesel plant in Houstion, Texas with a capacity of...

  20. Conceptual Model At Raft River Geothermal Area (1988) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1988) Exploration Activity Details Location Raft River...

  1. Conceptual Model At Raft River Geothermal Area (1977) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  2. Field Mapping At Raft River Geothermal Area (1977) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Field Mapping At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  3. Geophysical Method At Raft River Geothermal Area (1975) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geophysical Method At Raft River Geothermal Area (1975) Exploration Activity Details Location Raft River...

  4. Field Mapping At Raft River Geothermal Area (1980) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Field Mapping At Raft River Geothermal Area (1980) Exploration Activity Details Location Raft River...

  5. Microearthquake surveys of Snake River plain and Northwest Basin...

    Open Energy Info (EERE)

    microearthquakes; Nevada; North America; passive systems; Pershing County Nevada; Raft River; reservoir rocks; seismic methods; seismicity; seismology; Snake River plain;...

  6. Core Analysis At Raft River Geothermal Area (1981) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Core Analysis At Raft River Geothermal Area (1981) Exploration Activity Details Location Raft River...

  7. Field Mapping At Raft River Geothermal Area (1990) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Field Mapping At Raft River Geothermal Area (1990) Exploration Activity Details Location Raft River...

  8. Conceptual Model At Raft River Geothermal Area (1987) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1987) Exploration Activity Details Location Raft River...

  9. Conceptual Model At Raft River Geothermal Area (1990) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1990) Exploration Activity Details Location Raft River...

  10. Conceptual Model At Raft River Geothermal Area (1983) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1983) Exploration Activity Details Location Raft River...

  11. Aeromagnetic Survey At Raft River Geothermal Area (1981) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Aeromagnetic Survey At Raft River Geothermal Area (1981) Exploration Activity Details Location Raft River...

  12. Core Analysis At Raft River Geothermal Area (1976) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Core Analysis At Raft River Geothermal Area (1976) Exploration Activity Details Location Raft River...

  13. Geophysical Method At Raft River Geothermal Area (1977) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geophysical Method At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  14. Exploratory Well At Raft River Geothermal Area (1977) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Exploratory Well At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  15. Exploratory Well At Raft River Geothermal Area (1975) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Exploratory Well At Raft River Geothermal Area (1975) Exploration Activity Details Location Raft River...

  16. Tracer Testing At Raft River Geothermal Area (1983) | Open Energy...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Tracer Testing At Raft River Geothermal Area (1983) Exploration Activity Details Location Raft River...

  17. Aeromagnetic Survey At Raft River Geothermal Area (1978) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Aeromagnetic Survey At Raft River Geothermal Area (1978) Exploration Activity Details Location Raft River...

  18. Enforcement Letter, Savannah River Ecology Laboratory- June 7, 2000

    Broader source: Energy.gov [DOE]

    Issued to Savannah River Ecology Laboratory related to Radioactive Material Control Deficiencies at the Savannah River Site

  19. Washington River Protection Solutions - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contracting Washington River Protection Solutions Contracting ORP Contracts and Procurements RL Contracts and Procurements CH2M HILL Plateau Remediation Company Mission Support Alliance Washington Closure Hanford HPM Corporation (HPMC) Wastren Advantage, Inc. Bechtel National, Inc. Washington River Protection Solutions Washington River Protection Solutions Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Washington River Protection Solutions, LLC logo The operation

  20. Office of River Protection - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of River Protection Office of River Protection About ORP ORP Projects & Facilities Newsroom Contracts & Procurements Contact ORP Office of River Protection Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Registration for 2016 Hanford Cleanup Tours PHOENIX Tanks - Live Now UNITED STATES DEPARTMENT OF ENERGY Office of River Protection The U.S. Department of Energy's (DOE) Hanford Site in southeast Washington State is home to 56 million gallons of

  1. Columbia River Component Data Evaluation Summary Report

    SciTech Connect (OSTI)

    C.S. Cearlock

    2006-08-02

    The purpose of the Columbia River Component Data Compilation and Evaluation task was to compile, review, and evaluate existing information for constituents that may have been released to the Columbia River due to Hanford Site operations. Through this effort an extensive compilation of information pertaining to Hanford Site-related contaminants released to the Columbia River has been completed for almost 965 km of the river.

  2. Publications | Savannah River National Environmental Park

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Savannah River NERP Program Publications The Snakes of the Savannah River Plant with Information about Snakebite Prevention and Treatment. J. Whitfield Gibbons. 1977. SRO-NERP-1. 26 p. [Download PDF] The Reptiles and Amphibians of the Savannah River Plant. J. Whitfield Gibbons and Karen K. Patterson. 1978. SRO-NERP-2. 24p. [Download PDF] The Freshwater Bivalve Mollusca (Unionidae, Sphaeriidae, Corbiculidae) of the Savannah River Plant, South Carolina. Joseph C. Britton and Samuel L. H. Fuller.

  3. Bayer Material Science (TRL 1 2 3 System)- River Devices to Recover Energy with Advanced Materials(River DREAM)

    Broader source: Energy.gov [DOE]

    Bayer Material Science (TRL 1 2 3 System) - River Devices to Recover Energy with Advanced Materials(River DREAM)

  4. Savannah River Site: Plutonium Preparation Project (PuPP) at Savannah River

    Energy Savers [EERE]

    Savannah River Site Savannah River Site Savannah River Site | June 2011 Aerial View Savannah River Site | June 2011 Aerial View Savannah River Site (SRS) has mission responsibilities in nuclear weapons stockpile stewardship by ensuring the safe and reliable management of tritium resources; by contributing to the stockpile surveillance program; and by assisting in the development of alternatives for large-scale pit disassembly/conversion capability. SRS also manages excess nuclear materials and

  5. Smith River Rancheria- 2005 Project

    Broader source: Energy.gov [DOE]

    The Smith River Rancheria located just south of the Oregon border, on the coast, knows that developing a power-generation facility is a crucial part of its multifaceted plan for both economic development and reduction of energy costs. The activities associated with this grant will include the basic steps necessary to determine whether a generation facility will, in fact, benefit the tribe.

  6. HANFORD SITE RIVER CORRIDOR CLEANUP

    SciTech Connect (OSTI)

    BAZZELL, K.D.

    2006-02-01

    In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.

  7. Savannah River Plant/Savannah River Laboratory radiation exposure report

    SciTech Connect (OSTI)

    Rogers, C.D.; Hyman, S.D.; Keisler, L.L. and Co., Aiken, SC . Savannah River Plant); Reeder, D.F.; Jolly, L.; Spoerner, M.T.; Schramm, G.R. and Co., Aiken, SC . Savannah River Lab.)

    1989-01-01

    The protection of worker health and safety is of paramount concern at the Savannah River Site. Since the site is one of the largest nuclear sites in the nation, radiation safety is a key element in the protection program. This report is a compendium of the results in 1988 of the programs at the Savannah River Plant and the Savannah River Laboratory to protect the radiological health of employees. By any measure, the radiation protection performance at this site in 1988 was the best since the beginning of operations. This accomplishment was made possible by the commitment and support at all levels of the organizations to reduce radiation exposures to ALARA (As Low As Reasonably Achievable). The report provides detailed information about the radiation doses received by departments and work groups within these organizations. It also includes exposure data for recent years to allow Plant and Laboratory units to track the effectiveness of their ALARA efforts. Many of the successful practices and methods that reduced radiation exposure are described. A new goal for personnel contamination cases has been established for 1989. Only through continual and innovative efforts to minimize exposures can the goals be met. The radiation protection goals for 1989 and previous years are included in the report. 27 figs., 58 tabs.

  8. Savannah River Laboratory Decontamination Program

    SciTech Connect (OSTI)

    Rankin, W.N.

    1991-01-01

    Savannah River Laboratory (SRL) has had a Decontamination and Decommissioning (D D) Technology program since 1981. The objective of this program is to provide state-of-the-art technology for use in D D operations that will enable our customers to minimize waste generated and personal exposure, increase productivity and safety, and to minimize the potential for release and uptake of radioactive material. The program identifies and evaluates existing technology, develops new technology, and provides technical assistance to implement its use onsite. This program has impacted not only the Savannah River Site (SRS), but the entire Department of Energy (DOE) complex. To document and communicate the technology generated by this program, 28 papers have been presented at National and International meetings in the United States and Foreign Countries.

  9. Savannah River Laboratory Decontamination Program

    SciTech Connect (OSTI)

    Rankin, W.N.

    1991-12-31

    Savannah River Laboratory (SRL) has had a Decontamination and Decommissioning (D&D) Technology program since 1981. The objective of this program is to provide state-of-the-art technology for use in D&D operations that will enable our customers to minimize waste generated and personal exposure, increase productivity and safety, and to minimize the potential for release and uptake of radioactive material. The program identifies and evaluates existing technology, develops new technology, and provides technical assistance to implement its use onsite. This program has impacted not only the Savannah River Site (SRS), but the entire Department of Energy (DOE) complex. To document and communicate the technology generated by this program, 28 papers have been presented at National and International meetings in the United States and Foreign Countries.

  10. Raft River geoscience case study

    SciTech Connect (OSTI)

    Dolenc, M.R.; Hull, L.C.; Mizell, S.A.; Russell, B.F.; Skiba, P.A.; Strawn, J.A.; Tullis, J.A.

    1981-11-01

    The Raft River Geothermal Site has been evaluated over the past eight years by the United States Geological Survey and the Idaho National Engineering Laboratory as a moderate-temperature geothermal resource. The geoscience data gathered in the drilling and testing of seven geothermal wells suggest that the Raft River thermal reservoir is: (a) produced from fractures found at the contact metamorphic zone, apparently the base of detached normal faulting from the Bridge and Horse Well Fault zones of the Jim Sage Mountains; (b) anisotropic, with the major axis of hydraulic conductivity coincident to the Bridge Fault Zone; (c) hydraulically connected to the shallow thermal fluid of the Crook and BLM wells based upon both geochemistry and pressure response; (d) controlled by a mixture of diluted meteoric water recharging from the northwest and a saline sodium chloride water entering from the southwest. Although the hydrogeologic environment of the Raft River geothermal area is very complex and unique, it is typical of many Basin and Range systems.

  11. The Columbia River System : the Inside Story.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1991-09-01

    The Columbia Ricer is one of the greatest natural resources in the western United States. The river and its tributaries touch the lives of nearly every resident of the Northwest-from providing the world-famous Pacific salmon to supplying the clean natural fuel for over 75 percent of the region's electrical generation. Since early in the century, public and private agencies have labored to capture the benefits of this dynamic river. Today, dozens of major water resource projects throughout the region are fed by the waters of the Columbia Basin river system. And through cooperative efforts, the floods that periodically threaten developments near the river can be controlled. This publication presents a detailed explanation of the planning and operation of the multiple-use dams and reservoirs of the Columbia River system. It describes the river system, those who operate and use it, the agreements and policies that guide system operation, and annual planning for multiple-use operation.

  12. U. S. Department of Energy Savannah River Operations Office - Tenant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Organizations Organizations Tenant Organizations Federal Offices National Nuclear Security Administration External Link Office of Environmental Management External Link U. S. Forest Service - Savannah River External Link Contractor Organizations Savannah River Nuclear Solutions External Link Savannah River National Laboratory External Link Savannah River Remediation External Link Centerra University of Georgia - Savannah River Ecology Laboratory External Link Shaw AREVA MOX Services External

  13. Deep drilling data, Raft River geothermal area, Idaho-Raft River...

    Open Energy Info (EERE)

    data, Raft River geothermal area, Idaho-Raft River geothermal exploration well sidetrack-C Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Deep drilling...

  14. Savannah River Site Vegetation Map | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Set-Aside Program SREL HOME Savannah River Site Vegetation Map swatch 1. Industrial swatch 2. Open water swatch 3. Bare soil / bare surface swatch 4. Sparse herbaceous vegetation swatch 5. Grasses and forbs swatch 6. Shrubs, grasses, and forbs swatch 7. Disturbed and revegetated in 1997 swatch 8. Marsh / aquatic macrophytes swatch 9. Young, open-canopy loblolly pine swatch 10. Open-canopy loblolly pine swatch 11. Young, dense-canopy loblolly pine swatch 12. Dense-canopy loblolly pine swatch 13.

  15. Savannah River BioEnergy Integration Center Savannah River BioEnergy Integration Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BioEnergy Integration Center Savannah River BioEnergy Integration Center Savannah River Savannah River Nuclear Solutions, LLC, Mission Development January 14, 2010 - Rev 3 DRAFT - Business Sensitive Savannah River BioEnergy Integration Center Contents 2 Mission Need for BioEnergy Integration Center 3 Overview of the BioEnergy Integration Center 4 Expected Outcomes and Benefits 5 Implementation Approach and Timeline 6 Financial Considerations DRAFT - BUSINESS SENSITIVE Henry Ford really had a

  16. Beijing Changjiang River International Holding | Open Energy...

    Open Energy Info (EERE)

    100761 Sector: Services Product: Beijing Changjiang River International Holding is a Chinese emissions broker and services company. Coordinates: 39.90601, 116.387909 Show Map...

  17. PIA - Savannah River Nuclear Solutions Electronic Safeguards...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting registration web site PIA - HSPD-12 Physical and Logical Access System PIA - Savannah River Nuclear Solution SRNS Electronic Document Workflow RECORDS System (EDWS

  18. River Corridor Closure Project Partnering Performance Agreement...

    Office of Environmental Management (EM)

    - March 2009 Voluntary Protection Program Onsite Review, River Corridor Closure Project - June 2012 Indoctrinating Subcontractors into the DOE Safety Culture and Expectations...

  19. Big River Resources LLC | Open Energy Information

    Open Energy Info (EERE)

    Resources LLC Jump to: navigation, search Name: Big River Resources LLC Place: West Burlington, Iowa Zip: 52655 Product: Dry-mill bioethanol producer with a cooperative structure....

  20. The Columbia River System Inside Story

    SciTech Connect (OSTI)

    2001-04-01

    The Columbia River is one of the greatest natural resources in the western United States. The river and its tributaries touch the lives of nearly every resident of the Pacific Northwest—from fostering world-famous Pacific salmon to supplying clean natural fuel for 50 to 65 percent of the region’s electrical generation. Since early in the 20th century, public and private agencies have labored to capture the benefits of this dynamic river. Today, dozens of major water resource projects throughout the region are fed by the waters of the Columbia Basin river system.

  1. Big Rivers Electric Corp | Open Energy Information

    Open Energy Info (EERE)

    (270) 827-2561 Website: www.bigrivers.com Facebook: https:www.facebook.compagesBig-Rivers-Electric-Corporation142180855818082?rf154289971250771 Outage Hotline: (270)...

  2. Enforcement Letter, Westinghouse Savannah River Company - November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Company related to repeated criticality safety violations in 2002 and 2003 at the H-Canyon facility at DOE's Savannah River Site. PDF icon Enforcement Letter, Westinghouse...

  3. River Valley Technology Center | Open Energy Information

    Open Energy Info (EERE)

    Valley Technology Center Jump to: navigation, search Name: River Valley Technology Center Place: United States Sector: Services Product: General Financial & Legal Services (...

  4. Two Rivers Water & Light | Open Energy Information

    Open Energy Info (EERE)

    Water & Light Jump to: navigation, search Name: Two Rivers Water & Light Place: Wisconsin Phone Number: (920) 793-5550 Website: trwaterandlight.com Facebook: https:...

  5. In the News | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Touch an Animal Day (WJBF, 22 Aug. 2015) UGA collaboration ... rabies (UGA Columns, 24 Feb. 2015) Savannah River ... Chronicle, 25 Dec. 2013) Ecology lab studies birds ...

  6. Lower Colorado River Authority | Open Energy Information

    Open Energy Info (EERE)

    Name: Lower Colorado River Authority Place: Texas Website: www.lcra.orgPagesdefault.asp Twitter: @lcra Facebook: https:www.facebook.comlowercoloradoriverauthority Outage...

  7. Savannah River Laboratory monthly report, November 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  8. Savannah River Laboratory monthly report, November 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  9. Savannah River Laboratory monthly report, September 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  10. Savannah River Laboratory monthly report, September 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  11. Savannah River Laboratory monthly report, July 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  12. Savannah River Laboratory monthly report, July 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  13. Savannah River Laboratory monthly report, August 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  14. Savannah River Laboratory monthly report, August 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)

  15. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Achievable (ALARA) deficiencies that contributed to unplanned worker uptakes and the spread of contamination at DOE's Savannah River Site. PDF icon Preliminary Notice of...

  16. Independent Oversight Review, Savannah River Operations Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and subcontractor employees at the Savannah River Site (SRS). This targeted review was performed at SRS from June 3 to 5, 2013. This report discusses the background, ...

  17. Power of the River History Book

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power-of-the-River-BPA-History-Book Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects &...

  18. Lumbee River EMC- Residential Energy Efficiency Program

    Broader source: Energy.gov [DOE]

    Lumbee River EMC (LREMC) offers rebates to its residential customers who purchase and install qualified energy efficient products or services. Rebates are available for:

  19. Savannah River Laboratory monthly report, October 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-01-01

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separations operations; environmental concerns; and waste management. (FI)

  20. Savannah River Laboratory monthly report, October 1991

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1991-12-31

    This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation, tritium facilities and production; separations operations; environmental concerns; and waste management. (FI)

  1. New Columbia River Estuary purchases benefit salmon

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the mouth of the Columbia River to permanently protect riverside habitat for Northwest fish and wildlife, including threatened and endangered salmon and steelhead. The...

  2. Brochure: Federal Columbia River Power System (FCRPS)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    these agencies maximize the use of the Columbia River by generating power, protecting fish and wildlife, controlling floods, providing irrigation and navigation, and sustaining...

  3. Roger Seitz Savannah River National Laboratory

    Office of Environmental Management (EM)

    Practical Considerations for Development and Selection of Scenarios Roger Seitz Savannah River ... Dust, Radon Drinking Water Fish Plant Foods Meat Milk Radioactively Contaminated ...

  4. Savannah River National Laboratory (SRNL) Environmental Sciences...

    Office of Environmental Management (EM)

    National Laboratory (SRNL) Environmental Sciences and Biotechnology Support of Waste Isolation Pilot Plant (WIPP) Savannah River National Laboratory (SRNL) Environmental Sciences ...

  5. Home | Savannah River Ecology Laboratory Environmental Outreach...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    diverse ecological research conducted by scientists at the Savannah River Ecology Laboratory. ... and pine snakes wild hog skull edible plant samples View Touch an Animal Day 2015 ...

  6. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enforcement (OE) investigation of the facts and circumstances concerning the unnecessary radiation exposure of three Westinghouse Savannah River Company (WSRC) personnel and the...

  7. Gila River Indian Community- 2012 Project

    Broader source: Energy.gov [DOE]

    The Gila River Indian Community (GRIC) will conduct feasibility studies of potential renewable energy projects on its lands in south central Arizona.

  8. Savannah River Needs Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This Needs Assessment for former Savannah River Site construction workers was developed for the purpose of collecting existing information relevant to exposure and health outcomes ...

  9. Brazos River Authority | Open Energy Information

    Open Energy Info (EERE)

    Place: Texas Phone Number: 1-888-922-6272 Website: www.brazos.org Facebook: https:www.facebook.compagesBrazos-River-Authority126719790675809?frefts Outage Hotline:...

  10. Cuivre River Electric- Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Cuivre River Electric Cooperative, through the Take Control & Save program, offers rebates for cooperative members who purchase efficient geothermal and dual fuel heat pumps, and electric water...

  11. ENVIRONMENTAL SCIENCES; SAVANNAH RIVER PLANT; ENVIRONMENTAL EFFECTS...

    Office of Scientific and Technical Information (OSTI)

    5 audit of SRP radioactive waste Ashley, C. 05 NUCLEAR FUELS; 54 ENVIRONMENTAL SCIENCES; SAVANNAH RIVER PLANT; ENVIRONMENTAL EFFECTS; RADIOACTIVE EFFLUENTS; EMISSION; HIGH-LEVEL...

  12. Hood River Passive House, Hood River, Oregon (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-02-01

    The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to "reduce home energy use by 30%-50%" (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project. The design includes high R-Value assemblies, extremely tight construction, high performance doors and windows, solar thermal DHW, heat recovery ventilation, moveable external shutters and a high performance ductless mini-split heat pump. Cost analysis indicates that many of the measures implemented in this project did not meet the BA standard for cost neutrality. The ductless mini-split heat pump, lighting and advanced air leakage control were the most cost effective measures. The future challenge will be to value engineer the performance levels indicated here in modeling using production based practices at a significantly lower cost.

  13. Smith River Rancheria- 2003 Project

    Broader source: Energy.gov [DOE]

    Implement a planning effort that addresses current and future energy needs and results in a long-term sustainable plan for energy self-sufficiency on the Rancheria. The Smith River Rancheria, located in northern Del Norte County, California about four miles south of the Oregon border on the Pacific Ocean, composes 184.4 acres. This effort is intended to promote energy self-sufficiency and assist in meeting the tribe's goal to preserve and protect the aboriginal territory of the Tolowa People.

  14. Louisiana Nuclear Profile - River Bend

    U.S. Energy Information Administration (EIA) Indexed Site

    River Bend" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date" 1,974,"8,363",98.0,"BWR","application/vnd.ms-excel","application/vnd.ms-excel" ,974,"8,363",98.0 "Data for 2010" "BWR = Boiling

  15. Florida Nuclear Profile - Crystal River

    U.S. Energy Information Administration (EIA) Indexed Site

    Crystal River1" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date" 3,860,0,"--","PWR","application/vnd.ms-excel","application/vnd.ms-excel" ,860,0,"--" "Data for 2010" "1 Unit was offline in 2010 for repairs." "-- Not applicable.

  16. EA-273-A Rainy River Energy Corporation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -A Rainy River Energy Corporation EA-273-A Rainy River Energy Corporation Order authorizing Rainy River Energy Corporation to export electric energy to Canada. PDF icon EA-273-A ...

  17. EA-1692: Red River Environmental Products, LLC Activated Carbon

    Energy Savers [EERE]

    Manufacturing Facility, Red River Parish, LA | Department of Energy 2: Red River Environmental Products, LLC Activated Carbon Manufacturing Facility, Red River Parish, LA EA-1692: Red River Environmental Products, LLC Activated Carbon Manufacturing Facility, Red River Parish, LA June 1, 2010 EA-1692: Final Environmental Assessment Construction and Start-Up of an Activated Carbon Manufacturing Facility in Red River Parish, Louisiana June 11, 2010 EA-1692: Finding of No Significant Impact Red

  18. Comments of the Lower Colorado River Authority | Department of Energy

    Energy Savers [EERE]

    Lower Colorado River Authority Comments of the Lower Colorado River Authority Comments of the Lower Colorado River Authority on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy PDF icon Comments of the Lower Colorado River Authority More Documents & Publications Lower Colorado River Authority Lower Colorado River Authority NBP RFI: Communications Requirements- Comments of Meeker Cooperative Light

  19. Wild and Scenic Rivers Act (1968)

    Broader source: Energy.gov [DOE]

    The National Wild and Scenic Rivers System was created by Congress in 1968 (Public Law 90-542; 16 U.S.C. 1271 et seq.) to preserve certain rivers with outstanding natural, cultural, and recreational values in a free-flowing condition for the enjoyment of present and future generations.

  20. Savannah River Site Environmental Report for 1998

    SciTech Connect (OSTI)

    Arnett, M.

    1999-06-09

    The mission at the Savannah River Site (SRS) is focused primarily on support of the national defense, nonproliferation, and environmental cleanup. SRS-through its prime operating contractor, Westinghouse Savannah River Company-continues to maintain a comprehensive environmental monitoring program.

  1. PIA - Savannah River Nuclear Solution SRNS Electronic Document...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SRNS Electronic Document Workflow RECORDS System (EDWS) PIA - Savannah River Nuclear Solution SRNS Electronic Document Workflow RECORDS System (EDWS) PIA - Savannah River Nuclear ...

  2. PIA - Savannah River Nuclear Solution SRNS ProRad Environment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (HRMS) PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS) PIA - Savannah River Nuclear Solution SRNS Electronic Document Workflow RECORDS System (EDWS

  3. PP-41 Mirias River Electric Cooperative, Inc. | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Mirias River Electric Cooperative, Inc. to constuct, operate, and maintain electric transmission facilities at the U.S.- Canada Border. PDF icon PP-41 Mirias River Electric ...

  4. ITP LEADER Case Study: Flambeau River Papers Makes a Comeback...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LEADER Case Study: Flambeau River Papers Makes a Comeback With a Revised Energy Strategy ITP LEADER Case Study: Flambeau River Papers Makes a Comeback With a Revised Energy ...

  5. Vermont Watershed Management Rivers Program Website | Open Energy...

    Open Energy Info (EERE)

    Vermont Watershed Management Rivers Program Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Vermont Watershed Management Rivers Program Website...

  6. American Society of Mechanical Engineers/Savannah River National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary American Society of Mechanical EngineersSavannah River National Laboratory (ASME... More Documents & Publications American Society of Mechanical EngineersSavannah River ...

  7. American Society of Mechanical Engineers/Savannah River National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agenda American Society of Mechanical EngineersSavannah River National Laboratory (ASME... More Documents & Publications American Society of Mechanical EngineersSavannah River ...

  8. American Society of Mechanical Engineers/Savannah River National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting Attendee List American Society of Mechanical EngineersSavannah River National ... More Documents & Publications American Society of Mechanical EngineersSavannah River ...

  9. Savannah River Site Contractor Resumes Full Operations Following...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Site Contractor Resumes Full Operations Following Pause April 27, 2016 - 12:25pm Addthis AIKEN, S.C. - Savannah River Site management and operations contractor ...

  10. Lichuan City Yujiang River Valley Hydro Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Lichuan City Yujiang River Valley Hydro Co Ltd Jump to: navigation, search Name: Lichuan City Yujiang River Valley Hydro Co., Ltd. Place: Hubei Province, China Zip: 445400 Sector:...

  11. Savannah River Field Office | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Us Our Operations Management and Budget Office of Civil Rights Workforce Statistics Savannah River Field Office Savannah River Field Office FY15 Year End Report Semi...

  12. White River Electric Assn, Inc | Open Energy Information

    Open Energy Info (EERE)

    Assn, Inc Jump to: navigation, search Name: White River Electric Assn, Inc Place: Colorado Website: www.white-river-electric-assoc Twitter: @WREAColorado Facebook: https:...

  13. 2012 Annual Planning Summary for Savannah River Operations Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Operations Office 2012 Annual Planning Summary for Savannah River Operations Office The ongoing and projected Environmental Assessments and Environmental Impact ...

  14. Ventilation System to Improve Savannah River Site's Liquid Waste...

    Office of Environmental Management (EM)

    Ventilation System to Improve Savannah River Site's Liquid Waste Operations Ventilation System to Improve Savannah River Site's Liquid Waste Operations August 28, 2014 - 12:00pm ...

  15. PIA - Savannah River Operations Office Lotus Domino/Notes System...

    Broader source: Energy.gov (indexed) [DOE]

    Lotus DominoNotes System PDF icon PIA - Savannah River Operations Office Lotus DominoNotes System More Documents & Publications PIA - DOE Savannah River Operations Office PRISM ...

  16. FY 2012 Savannah River Nuclear Solutions, LLC, PER Summary |...

    National Nuclear Security Administration (NNSA)

    12 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2012 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  17. FY 2010 Savannah River Nuclear Solutions, LLC, PER Summary |...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2010 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  18. PIA - Savannah River Site Management and Operating Contractor...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor ...

  19. Small Column Ion Exchange at Savannah River Site Technology Readiness...

    Broader source: Energy.gov (indexed) [DOE]

    Small Column Ion Exchange at Savannah River Site Technology Readiness Assessment Report More Documents & Publications Small Column Ion Exchange Technology at Savannah River Site ...

  20. John C. Barnes of Savannah River Operations named 2012 Facility...

    Energy Savers [EERE]

    John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year John C. Barnes of Savannah River Operations named 2012 Facility Representative of the ...

  1. PIA - Savannah River Nuclear Solutions Badge Request and Site...

    Energy Savers [EERE]

    Badge Request and Site Personnel Roster Systems PIA - Savannah River Nuclear Solutions Badge Request and Site Personnel Roster Systems PIA - Savannah River Nuclear Solutions Badge ...

  2. Savannah River Site Cleanup By the Numbers | Department of Energy

    Office of Environmental Management (EM)

    Site Cleanup By the Numbers Savannah River Site Cleanup By the Numbers Savannah River Site Cleanup By the Numbers In 2015, EM developed site infographics highlighting each sites ...

  3. FY 2008 Washington Savannah River Company, LLC, PER Summary ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2008 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  4. Passive Groundwater Cleanup Measures Save Savannah River Site...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Passive Groundwater Cleanup Measures Save Savannah River Site Millions of Dollars Passive Groundwater Cleanup Measures Save Savannah River Site Millions of Dollars November 25, ...

  5. Centerra Earns High Performance Rating for Savannah River Site...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Centerra Earns High Performance Rating for Savannah River Site Security Operations Centerra Earns High Performance Rating for Savannah River Site Security Operations January 27, ...

  6. U. S. Department of Energy Savannah River Operations Office ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Small Business Forum Technology Demos & opportunities The Department of Energy Office of Environmental Management, Savannah River Site and the Savannah River National Laboratory ...

  7. Savannah River National Laboratory by the Numbers August 2015

    Office of Environmental Management (EM)

    In 1951, the Savannah River Laboratory was created to support these efforts. In 2004 the laboratory was designated a National Laboratory, renamed Savannah River National Laboratory ...

  8. FY 2006 Washington Savannah River Company, LLC, PER Summary ...

    National Nuclear Security Administration (NNSA)

    6 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2006 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  9. Enterprise Assessments Review, Savannah River Site 2014 Site...

    Energy Savers [EERE]

    Savannah River Site 2014 Site-Level Exercise - January 2015 Enterprise Assessments Review, Savannah River Site 2014 Site-Level Exercise - January 2015 January 2015 Review of the ...

  10. Disposal Practices at the Savannah River Site | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Practices at the Savannah River Site Disposal Practices at the Savannah River Site Full Document and Summary Versions are available for download PDF icon Disposal Practices at the ...

  11. Dennis Yates Of Savannah River Operations Named 2013 Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dennis Yates Of Savannah River Operations Named 2013 Facility Representative Of The Year Dennis Yates Of Savannah River Operations Named 2013 Facility Representative Of The Year ...

  12. Independent Oversight Follow-up Review, Savannah River National...

    Energy Savers [EERE]

    Savannah River National Laboratory - January 2012 Independent Oversight Follow-up Review, Savannah River National Laboratory - January 2012 January 2012 Follow-up Review of ...

  13. DOE - Office of Legacy Management -- Savannah River Swamp - SC...

    Office of Legacy Management (LM)

    Savannah River Swamp - SC 01 FUSRAP Considered Sites Site: Savannah River Swamp (SC.01 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site ...

  14. Construction Workers Achieve Safety Milestone at Savannah River...

    Office of Environmental Management (EM)

    Construction Workers Achieve Safety Milestone at Savannah River Site Construction Workers Achieve Safety Milestone at Savannah River Site April 29, 2014 - 4:23pm Addthis Savannah ...

  15. Microsoft PowerPoint - Allison - Savannah River Presentation

    Office of Environmental Management (EM)

    September 30, 2009 September 30, 2009 JEFFREY M. ALLISON, MANAGER JEFFREY M. ALLISON, MANAGER Savannah River Operations Office Savannah River Operations Office The State of ...

  16. Savannah River Site Federal Facility Agreement, January 15, 1993...

    Office of Environmental Management (EM)

    Site Agreement Name Savannah River Site Federal Facility Agreement Under Section 120 of ... with past and present activities at the Savannah River Site are thoroughly investigated ...

  17. DEPARTMENT OF ENERGY CITES SAVANNAH RIVER NUCLEAR SOLUTIONS,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC FOR WORKER SAFETY AND HEALTH VIOLATIONS November 9, ... Notice of Violation (PNOV) to Savannah River Nuclear Solutions, LLC (SRNS) for ...

  18. DOE Order 435.1 Performance Assessment Savannah River Site |...

    Energy Savers [EERE]

    Order 435.1 Performance Assessment Savannah River Site DOE Order 435.1 Performance Assessment Savannah River Site Performance Assessments (PA) are analyses conducted for low level ...

  19. Employee of Savannah River Site Contractor Recognized as Exemplary...

    Office of Environmental Management (EM)

    Employee of Savannah River Site Contractor Recognized as Exemplary in Safety and Health Employee of Savannah River Site Contractor Recognized as Exemplary in Safety and Health ...

  20. Ground Magnetics At Raft River Geothermal Area (1979) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Raft River Geothermal Area (1979)...

  1. Numerical Modeling At Raft River Geothermal Area (1983) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Numerical Modeling At Raft River Geothermal Area (1983)...

  2. Micro-Earthquake At Raft River Geothermal Area (1979) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Raft River Geothermal Area (1979) Exploration Activity Details Location Raft River...

  3. Fluid Inclusion Analysis At Raft River Geothermal Area (2011...

    Open Energy Info (EERE)

    Raft River Geothermal Area (2011) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Fluid Inclusion Analysis At Raft River Geothermal Area (2011)...

  4. Cuttings Analysis At Raft River Geothermal Area (1976) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1976) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Cuttings Analysis At Raft River Geothermal Area (1976)...

  5. Update on the Raft River Geothermal Reservoir | Open Energy Informatio...

    Open Energy Info (EERE)

    the Raft River Geothermal Reservoir Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Proceedings: Update on the Raft River Geothermal Reservoir...

  6. Groundwater Sampling At Raft River Geothermal Area (1974-1982...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Groundwater Sampling At Raft River Geothermal Area (1974-1982) Exploration Activity Details Location Raft River...

  7. Micro-Earthquake At Raft River Geothermal Area (2011) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Raft River Geothermal Area (2011) Exploration Activity Details Location Raft River...

  8. Electromagnetic Soundings At Raft River Geothermal Area (1977...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1977) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Electromagnetic Soundings At Raft River Geothermal Area (1977)...

  9. Thermochronometry At Raft River Geothermal Area (1993) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1993) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Thermochronometry At Raft River Geothermal Area (1993)...

  10. Isotopic Analysis-Fluid At Raft River Geothermal Area (1982)...

    Open Energy Info (EERE)

    GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Isotopic Analysis-Fluid At Raft River Geothermal Area (1982) Exploration Activity Details Location Raft River...

  11. Telluric Survey At Raft River Geothermal Area (1978) | Open Energy...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1978) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Telluric Survey At Raft River Geothermal Area (1978)...

  12. Ground Gravity Survey At Raft River Geothermal Area (1978) |...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Raft River Geothermal Area (1978) Exploration Activity Details Location Raft River...

  13. Direct-Current Resistivity Survey At Raft River Geothermal Area...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current Resistivity Survey At Raft River Geothermal Area...

  14. DC Resistivity Survey (Schlumberger Array) At Raft River Geothermal...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1974-1975) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: DC Resistivity Survey (Schlumberger Array) At Raft River...

  15. Development Wells At Raft River Geothermal Area (2004) | Open...

    Open Energy Info (EERE)

    Development Wells At Raft River Geothermal Area (2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Development Wells At Raft River Geothermal...

  16. Self Potential Measurements At Raft River Geothermal Area (1983...

    Open Energy Info (EERE)

    Measurements At Raft River Geothermal Area (1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Self Potential Measurements At Raft River...

  17. Audio-Magnetotellurics At Raft River Geothermal Area (1978) ...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1978) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Audio-Magnetotellurics At Raft River Geothermal Area (1978)...

  18. Earth Tidal Analysis At Raft River Geothermal Area (1984) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Earth Tidal Analysis At Raft River Geothermal Area (1984) Exploration Activity Details Location Raft River...

  19. Petrography Analysis At Raft River Geothermal Area (1980) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1980) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Petrography Analysis At Raft River Geothermal Area (1980)...

  20. Core Analysis At Raft River Geothermal Area (1979) | Open Energy...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Core Analysis At Raft River Geothermal Area (1979) Exploration...

  1. Geology and alteration of the Raft River geothermal system, Idaho...

    Open Energy Info (EERE)

    Raft River geothermal system, Idaho Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Proceedings: Geology and alteration of the Raft River geothermal...

  2. Airborne Electromagnetic Survey At Raft River Geothermal Area...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Airborne Electromagnetic Survey At Raft River Geothermal Area...

  3. Compound and Elemental Analysis At Raft River Geothermal Area...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1981) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Compound and Elemental Analysis At Raft River Geothermal Area...

  4. Isotopic Analysis-Fluid At Raft River Geothermal Area (1977)...

    Open Energy Info (EERE)

    GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Isotopic Analysis-Fluid At Raft River Geothermal Area (1977) Exploration Activity Details Location Raft River...

  5. Earth Tidal Analysis At Raft River Geothermal Area (1982) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Earth Tidal Analysis At Raft River Geothermal Area (1982) Exploration Activity Details Location Raft River...

  6. Earth Tidal Analysis At Raft River Geothermal Area (1980) | Open...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Earth Tidal Analysis At Raft River Geothermal Area (1980) Exploration Activity Details Location Raft River...

  7. Chemical Logging At Raft River Geothermal Area (1979) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Chemical Logging At Raft River Geothermal Area (1979)...

  8. Acoustic Logs At Raft River Geothermal Area (1979) | Open Energy...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Acoustic Logs At Raft River Geothermal Area (1979) Exploration...

  9. Fault Mapping At Raft River Geothermal Area (1993) | Open Energy...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1993) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Fault Mapping At Raft River Geothermal Area (1993) Exploration...

  10. Exhibit D: Mirant Potomac River Schedule of Operations: January...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations: January and February 2006 Exhibit D: Mirant Potomac River Schedule of Operations: January and February 2006 Docket No. EO-05-01. Exhibit D: Mirant Potomac River ...

  11. Tianlin Baile River Hydropower Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Baile River Hydropower Co Ltd Jump to: navigation, search Name: Tianlin Baile River Hydropower Co., Ltd. Place: Baise, Guangxi Autonomous Region, China Zip: 533300 Sector: Hydro...

  12. Independent Oversight Review, Savannah River Site Salt Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 August 2013 Review of the Savannah River Site Salt Waste Processing...

  13. Yingjiang County Binglang River Hydroelectric Power Co Ltd |...

    Open Energy Info (EERE)

    Yingjiang County Binglang River Hydroelectric Power Co Ltd Jump to: navigation, search Name: Yingjiang County Binglang River Hydroelectric Power Co., Ltd. Place: Dehong Dai-Jingpo...

  14. Enforcement Letter, Westinghouse Savannah River Company- June 4, 1996

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Potential Violations of the Quality Assurance and Occupational Radiation Protection Rules at the Savannah River Site

  15. PIA - Savannah River Operations Office Executive Commitment Action...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations ...

  16. Ground Gravity Survey At Snake River Plain Region (DOE GTP) ...

    Open Energy Info (EERE)

    Ground Gravity Survey At Snake River Plain Region (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Snake River...

  17. 2013 Annual Planning Summary for the Office of River Protection...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    River Protection and Richland Operations Office 2013 Annual Planning Summary for the Office of River Protection and Richland Operations Office The ongoing and projected ...

  18. Jichuan Taiyang River Hydro Power Development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Jichuan Taiyang River Hydro Power Development Co Ltd Jump to: navigation, search Name: Jichuan Taiyang River Hydro Power Development Co., Ltd. Place: Sichuan Province, China Zip:...

  19. Yunnan Daoyao County Duodi River Hydro Power Development Co Ltd...

    Open Energy Info (EERE)

    Daoyao County Duodi River Hydro Power Development Co Ltd Jump to: navigation, search Name: Yunnan Daoyao County Duodi River Hydro Power Development Co., Ltd. Place: Yunnan...

  20. Gansu Diantou Tao River Hydro Power Development Co Ltd | Open...

    Open Energy Info (EERE)

    River Hydro Power Development Co Ltd Jump to: navigation, search Name: Gansu Diantou Tao River Hydro Power Development Co. Ltd. Place: Lanzhou, Gansu Province, China Zip: 730030...

  1. Huanghe Hydropower Development Co Ltd Yellow River Group | Open...

    Open Energy Info (EERE)

    Huanghe Hydropower Development Co Ltd Yellow River Group Jump to: navigation, search Name: Huanghe Hydropower Development Co Ltd (Yellow River Group) Place: Xining, Qinghai...

  2. Geothermometry At New River Area (DOE GTP) | Open Energy Information

    Open Energy Info (EERE)

    New River Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geothermometry At New River Area (DOE GTP) Exploration Activity Details...

  3. Refraction Survey At Snake River Plain Region (DOE GTP) | Open...

    Open Energy Info (EERE)

    Snake River Plain Region (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Refraction Survey At Snake River Plain Region (DOE GTP)...

  4. Magnetotellurics At New River Area (DOE GTP) | Open Energy Information

    Open Energy Info (EERE)

    New River Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Magnetotellurics At New River Area (DOE GTP) Exploration Activity...

  5. COMPARISON OF THREE TRACER TESTS AT THE RAFT RIVER GEOTHERMAL...

    Office of Scientific and Technical Information (OSTI)

    TESTS AT THE RAFT RIVER GEOTHERMAL SITE Citation Details In-Document Search Title: COMPARISON OF THREE TRACER TESTS AT THE RAFT RIVER GEOTHERMAL SITE Three conservative ...

  6. Micro-Earthquake At Snake River Plain Geothermal Region (1976...

    Open Energy Info (EERE)

    Micro-Earthquake At Snake River Plain Geothermal Region (1976) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Snake River...

  7. FY 2006 Washington Savannah River Company, LLC, PER Summary ...

    National Nuclear Security Administration (NNSA)

    FY 2006 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2006 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned ...

  8. FY 2007 Washington Savannah River Company, LLC, PER Summary ...

    National Nuclear Security Administration (NNSA)

    FY 2007 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2007 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned ...

  9. FY 2009 Savannah River Nuclear Solutions, LLC, PER Summary |...

    National Nuclear Security Administration (NNSA)

    FY 2009 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2009 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  10. FY 2011 Savannah River Nuclear Solutions, LLC, PER Summary |...

    National Nuclear Security Administration (NNSA)

    FY 2011 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2011 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  11. FY 2010 Savannah River Nuclear Solutions, LLC, PER Summary |...

    National Nuclear Security Administration (NNSA)

    FY 2010 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2010 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  12. FY 2008 Washington Savannah River Company, LLC, PER Summary ...

    National Nuclear Security Administration (NNSA)

    FY 2008 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2008 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned ...

  13. EA-1973: Kootenai River Restoration at Bonners Ferry, Boundary...

    Energy Savers [EERE]

    73: Kootenai River Restoration at Bonners Ferry, Boundary County, Idaho EA-1973: Kootenai River Restoration at Bonners Ferry, Boundary County, Idaho Summary Bonneville Power...

  14. Interagency Wild and Scenic Rivers Coordinating Council's WSRA...

    Open Energy Info (EERE)

    to use the flowcharts created by the Interagency Wild and Scenic Rivers Coordinating Council. Author The Interagency Wild and Scenic Rivers Coordinating Council Published The...

  15. Reed River Hot Spring Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Reed River Hot Spring Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Reed River Hot Spring Geothermal Area Contents 1 Area Overview 2 History and...

  16. PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditati...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    IBARS Srs Site Apps. Accreditation Boundary PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditation Boundary PIA - Savannah River Nuclear Solution IBARS Srs Site ...

  17. Red River Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Red River Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Red River Hot Springs Geothermal Area Contents 1 Area Overview 2 History and...

  18. Red River Hot Springs Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Springs Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Red River Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Red River Hot...

  19. Office of River Protection's (ORP) Path to Reinvigorating Technology...

    Office of Environmental Management (EM)

    Office of River Protection's (ORP) Path to Reinvigorating Technology Development Presentation from the 2015 DOE National Cleanup Workshop by Kevin Smith, Manager, Office of River ...

  20. Columbia River PUD- Commercial Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Columbia River PUD offers a variety of rebates to commercial and industrial customers who make energy saving improvements to facilities. Visit Columbia River PUD's website for specific program...

  1. Yingjiang Nanpian River Electricity Exploring Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Nanpian River Electricity Exploring Co Ltd Jump to: navigation, search Name: Yingjiang Nanpian River Electricity Exploring Co., Ltd. Place: Dehong Dai-Jingpo Autonomous Prefecture,...

  2. Independent Activity Report, Office of River Protection Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of River Protection Waste Treatment Plant and Tank Farms - February 2013 Independent Activity Report, Office of River Protection Waste Treatment Plant and Tank Farms - February...

  3. Tongue River Electric Coop Inc | Open Energy Information

    Open Energy Info (EERE)

    Tongue River Electric Coop Inc Jump to: navigation, search Name: Tongue River Electric Coop Inc Place: Montana Phone Number: 406-784-2341 Website: tongueriverelectric.com...

  4. Trona Injection Tests: Mirant Potomac River Station, Unit 1,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the Potomac River Generating Station in Alexandria, Virginia Update 2 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant, Modeling Unit ...

  5. Kings River Conservation District (KRCD) Solar Farm Solar Power...

    Open Energy Info (EERE)

    River Conservation District (KRCD) Solar Farm Solar Power Plant Jump to: navigation, search Name Kings River Conservation District (KRCD) Solar Farm Solar Power Plant Facility...

  6. Enforcement Letter, Westinghouse Savannah River Company- April 15, 1997

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Potential Violations of Quality Assurance and Work Process Requirements at the Savannah River Site

  7. Hunan Rivers Bioengineering Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Rivers Bioengineering Co Ltd Jump to: navigation, search Name: Hunan Rivers Bioengineering Co Ltd Place: Yiyang, Hunan Province, China Zip: 413000 Product: The company uses waste...

  8. PIA - Savannah River Nuclear Solutions Training Records and Informatio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Solutions Training Records and Information Network (TRAIN) PIA - Savannah River Nuclear Solutions Training Records and Information Network (TRAIN) PIA - Savannah River ...

  9. Lessons Learned and Best Practices in Savannah River Site Saltstone...

    Office of Environmental Management (EM)

    Lessons Learned and Best Practices in Savannah River Site Saltstone and Tank Farm Performance Assessments Lessons Learned and Best Practices in Savannah River Site Saltstone and...

  10. Injectivity Test At Raft River Geothermal Area (1979) | Open...

    Open Energy Info (EERE)

    navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Injectivity Test At Raft River Geothermal Area (1979) Exploration Activity Details Location Raft River...

  11. Flow Test At Raft River Geothermal Area (1979) | Open Energy...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Raft River Geothermal Area (1979) Exploration Activity Details Location Raft River...

  12. Flow Test At Raft River Geothermal Area (2008) | Open Energy...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Raft River Geothermal Area (2008) Exploration Activity Details Location Raft River...

  13. Flow Test At Raft River Geothermal Area (2004) | Open Energy...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Raft River Geothermal Area (2004) Exploration Activity Details Location Raft River...

  14. Flow Test At Raft River Geothermal Area (2006) | Open Energy...

    Open Energy Info (EERE)

    Flow Test At Raft River Geothermal Area (2006) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Raft River Geothermal Area (2006)...

  15. Elk River Business Incubator Program | Open Energy Information

    Open Energy Info (EERE)

    Business Incubator Program Jump to: navigation, search Name: Elk River Business Incubator Program Place: Minnesota Zip: 55330 Product: Program run by Elk River Energy City....

  16. Gengma County Tiechang River Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Gengma County Tiechang River Power Plant Jump to: navigation, search Name: Gengma County Tiechang River Power Plant Place: Lincang City, Yunnan Province, China Zip: 666100 Sector:...

  17. Zijin County East River Fengguang Likou Power Plant Development...

    Open Energy Info (EERE)

    Zijin County East River Fengguang Likou Power Plant Development Co Ltd Jump to: navigation, search Name: Zijin County East River Fengguang Likou Power Plant Development Co.Ltd...

  18. Savannah River National Laboratory (SRNL) | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Logo: Savannah River National Laboratory Name: Savannah River National Laboratory Place: Aiken, South Carolina Zip: 29808 Website: srnl.doe.gov...

  19. Lesson Learned by Savannah River Site Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Bonnie Barnes, Savannah River Remediation. Work Planning and Control at Savannah River Remediation.

  20. Office of River Protection's (ORP) Path to Reinvigorating Technology Development

    Broader source: Energy.gov [DOE]

    Presentation from the 2015 DOE National Cleanup Workshop by Kevin Smith, Manager, Office of River Protection.

  1. Flambeau River Biofuels Demonstration-Scale Biorefinery | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Flambeau River Biofuels Demonstration-Scale Biorefinery Flambeau River Biofuels Demonstration-Scale Biorefinery The Flambeau River biorefinery will be added to an existing pulp and paper mill to create green diesel. PDF icon ibr_demonstration_flambeau.pdf More Documents & Publications NewPage Demonstration-Scale Biorefinery Flambeau_River_Biofuels.pdf Pacific Ethanol, Inc

  2. Savannah River Site Environmental Report for 1997-Data

    SciTech Connect (OSTI)

    Arnett, M.W.; Mamatey, A.R.

    1998-08-01

    This document presents data from Savannah River Site routine environmental monitoring and surveillance programs.

  3. Enforcement Letter, Westinghouse Savannah River Company- July 21, 1998

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Notification of Incomplete Corrective Action

  4. PIA - Savannah River Remediation Accreditation Boundary (SRR AB) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Remediation Accreditation Boundary (SRR AB) PIA - Savannah River Remediation Accreditation Boundary (SRR AB) PIA - Savannah River Remediation Accreditation Boundary (SRR AB) PDF icon PIA - Savannah River Remediation Accreditation Boundary (SRR AB) More Documents & Publications PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditation Boundary PIA - WEB Physical Security Major Application Occupational Medical Surveillance System (OMSS) PIA, Idaho

  5. Independent Oversight Review, Savannah River Site- September 2012

    Broader source: Energy.gov [DOE]

    Review of the Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping & Pipe Supports

  6. Independent Oversight Inspection, Savannah River Site- December 2009

    Office of Energy Efficiency and Renewable Energy (EERE)

    Inspection of Reinforced Concrete Construction at the Savannah River Site Mixed Oxide Fuel Fabrication Facility

  7. Independent Oversight Inspection, Savannah River Site, Summary Report- February 2004

    Broader source: Energy.gov [DOE]

    Inspection of Environment, Safety, and Health Management and Emergency Management at the Savannah River Site

  8. Savannah River Field Office | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Home / fieldoffices Savannah River Field Office Learn More Mixed Oxide (MOX) Fuel Fabrication Facility

  9. EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) is preparing an EA to assess potential environmental impacts of a proposal to rebuild its 24-mile long, 115 kilovolt Bonneville-Hood River transmission line. The existing line runs between the Bonneville Powerhouse at Bonneville Dam in Multnomah County, Oregon, and BPA's existing Hood River Substation in Hood River County, Oregon. The project would include replacing structures and conductor wires, improving access roads, and constructing new access roads or trails where needed.

  10. Clinch River MRS Task Force Recommendations

    Broader source: Energy.gov [DOE]

    The Clinch River HRS Task Force was appointed in July 1985 by the Roane County Executive and the Oak Ridge City Council to evaluate the Monitored Retrievable Storage (MRS) facility proposed by the...

  11. South River EMC- Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    South River EMC offers a variety of rebates encouragings its members to invest in energy efficient appliances, equipment, and home upgrades. Incentives are available for a variety of energy...

  12. EIS-0241: Hood River Fisheries Program

    Broader source: Energy.gov [DOE]

    This EIS evaluates a BPA proposal to protect and improve anadromous salmonid populations in the Hood River Basin. These actions are proposed in an attempt to mitigate the losses of fish and...

  13. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Intake between August 4, 1996, and February 10, 1997, by a Crane Operator at the Savannah River Site F-Canyon Preliminary Notice of Violation, EG&G Incorporated - EA-97-10...

  14. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - EA 98-09 Type B Accident Investigation Board Report of the Plutonium Intake between August 4, 1996, and February 10, 1997, by a Crane Operator at the Savannah River Site F-Canyon...

  15. Savannah River Site environmental data for 1995

    SciTech Connect (OSTI)

    Arnett, M.W.

    1995-12-31

    This document presents data from Savannah River Site routine environmental monitoring and surveillance programs. An attempt also has been made to include all available data from environmental research programs.

  16. Conference Center | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The University of Georgia - Savannah River Ecology Laboratory Conference Center is a 5,000-square-foot multi-purpose facility located on the U.S. Department of Energy's Savannah ...

  17. Upcoming Seminars | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upcoming Seminars Seminars are held at the Savannah River Ecology Laboratory, Bldg. 737-A, in the Cypress Room. Snacks are provided 15 minutes prior to the beginning of each ...

  18. Raft River Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    and later the US Department of Energy (DOE) which was formed by joining the Federal Energy Administration and ERDA in 1977.3 The Raft River site was identified as an area...

  19. Robert A. Kennamer | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Curriculum Vitae Faculty & Scientists SREL Home Robert A. Kennamer Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-0387 office (803) 725-3309 fax...

  20. Peter Stangel | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Senior Vice President, U.S. Endowment for Forestry and Communities co Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (404)-915-2763 (803) 725-8158...

  1. Gary Mills | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mills Curriculum Vitae Faculty & Scientists SREL Home Gary Mills Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5368 office (803) 725-3309 fax...

  2. BPA research aids Columbia River white sturgeon

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    research aids Columbia River white sturgeon 8142015 12:00 AM Tweet Page Content BPA fish biologist Scott Bettin (left) and Brad Cady of the Washington Dept. of Fish and...

  3. Lumbee River EMC- Residential Weatherization Loan Program

    Broader source: Energy.gov [DOE]

    Lumbee River Electric Membership Corporation (LREMC) offers low interest loans to help residential members increase the energy efficiency of homes. Loans up to $17,000 are available for the...

  4. Savannah River Site Environmental Report for 1997

    SciTech Connect (OSTI)

    Arnett, M.W.; Mamatey, A.R.

    1998-08-01

    The mission at the Savannah River Site has changed from the production of nuclear weapons materials for national defense to the management of waste, restoration of the environment, and the development of industry in and around the site.

  5. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect (OSTI)

    CERTA PJ

    2008-07-10

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste management and treatment facilities, (8) Developing and implementing technical solutions to mitigate the impact from substantial1y increased estimates of Na added during the pretreatment of the tank waste solids, This involves a combination of: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, or (4) accepting an increase in mission duration, ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks, Key elements of the implementation of this strategy are included within the scope of the Tank Operations Contract, currently in procurement Since 2003, the ORP has conducted over 30 design oversight assessments of the Waste Treatment and Immobilization Plant (WTP). The estimated cost at completion has increased and the schedule for construction and commissioning of the WTP has extended, The DOE, Office of Environmental Management (EM), sanctioned a comprehensive review of the WTP flowsheet, focusing on throughput. In 2005, the TFC completed interim stabilization of the SSTs and as of March 2007, has completed the retrieval of seven selected SSTs. Demonstration of supplemental treatment technologies continues. The ongoing tank waste retrieval experience, progress with supplemental treatment technologies, and changes in WTP schedule led to the FY 2007 TFC baseline submittal in November 2006. The TFC baseline submittal was developed before the WTP schedule was fully understood and approved by ORP, and therefore reflects an earlier start date for the WTP facilities. This System Plan is aligned with the current WTP schedule with hot commissioning beginning in 2018 and full operations beginning in 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of

  6. SAVANNAH RIVER SITE COLD WAR HISTORIC PROPERTY DOCUMENTATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WAR HISTORIC PROPERTY DOCUMENTATION NARRATIVE AND PHOTOGRAPHY CMX AND TNX SAVANNAH RIVER'S PILOT PLANTS Aiken County, South Carolina SAVANNAH RIVER SITE COLD WAR HISTORIC PROPERTY DOCUMENTATION CMX AND TNX CMX AND TNX SA SA V V ANNAH RIVER'S ANNAH RIVER'S PILOT PLANTS PILOT PLANTS Aiken County, South Carolina NARRATIVE AND PHOTOGRAPHY ii ABSTRACT This documentation was prepared in accordance with a Memorandum of Agreement (MOA) signed by the Department of Energy-Savannah River (DOE-SR) and the

  7. Exhibit D: Mirant Potomac River Schedule of Operations: January and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    February 2006 | Department of Energy Operations: January and February 2006 Exhibit D: Mirant Potomac River Schedule of Operations: January and February 2006 Docket No. EO-05-01. Exhibit D: Mirant Potomac River Schedule of Operations, January and February 2006 PDF icon Exhibit D: Mirant Potomac River Schedule of Operations More Documents & Publications Exhibit D: Mirant Potomac River Schedule of Unit Operations: January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit

  8. Exhibit D: Mirant Potomac River Schedule of Unit Operations: January -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 2006 | Department of Energy January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: January - March 2006 Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit Operations related to Supplement Number 4 of the Operating Plan of Mirant Potomac River, LLC PDF icon Exhibit D: Mirant Potomac River Schedule of Unit Operations More Documents & Publications Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 3, January and

  9. Voluntary Protection Program Onsite Review, Savannah River Remediation,

    Energy Savers [EERE]

    Llc, Liquid Waste Contract, Savannah River Site - November 2014 | Department of Energy Savannah River Remediation, Llc, Liquid Waste Contract, Savannah River Site - November 2014 Voluntary Protection Program Onsite Review, Savannah River Remediation, Llc, Liquid Waste Contract, Savannah River Site - November 2014 November 2014 Recertification of SRR as a Star Participant in the Department of Energy Voluntary Protection Program. This report summarizes the results from the evaluation of

  10. PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Procurement Cycle System (PCS) PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS) PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS) PDF icon PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS) More Documents & Publications PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety

  11. PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Boundary | Department of Energy IBARS Srs Site Apps. Accreditation Boundary PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditation Boundary PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditation Boundary PDF icon PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditation Boundary More Documents & Publications PIA - Savannah River Nuclear Solutions Badge Request and Site Personnel Roster Systems PIA - Savannah River Remediation

  12. PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System (HRMS) | Department of Energy (SRNS) Human Resource Management System (HRMS) PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) PDF icon PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) More Documents & Publications PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS) PIA - Savannah River Site

  13. QER - Comment of Powder River Energy Corporation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Powder River Energy Corporation QER - Comment of Powder River Energy Corporation From: Mike Easley [mikee@precorp.coop] Sent: Wednesday, August 20, 2014 11:59 PM To: QERcomments Subject: Comment on the QER Public Meeting in Cheyenne, WY: Infrastructure Siting Attachment: Michael Easley CEO Powder River Energy Corporation - Statement.pdf Statement of Michael E Easley Panel 1-Electric Infrastructure Siting Best Regards, Mike Michael Easley CEO Powder River Energy Corporation Powder River Energy,

  14. River Data Package for the 2004 Composite Analysis

    SciTech Connect (OSTI)

    Rakowski, Cynthia L.; Guensch, Gregory R.; Patton, Gregory W.

    2004-08-01

    Beginning in fiscal year 2003, the DOE Richland Operations Office initiated activities, including the development of data packages, to support the 2004 Composite Analysis. The river data package provides calculations of flow and transport in the Columbia River system. This document presents the data assembled to run the river module components for the section of the Columbia River from Vernita Bridge to the confluence with the Yakima River.

  15. Environmental Bulletin The Savannah River Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bulletin The Savannah River Site On January 25, 2016, the Department of Energy (DOE) issued a Notice of Availability (NOA) of its draft Environmental Assessment (EA) (DOE/EA-1977) evaluating the potential environmental impacts from a proposed action to receive, store, process and disposition spent nuclear fuel (SNF) from the Federal Republic of Germany at DOE's Savannah River Site (SRS) (Draft Spent Nuclear Fuel from Germany EA). In that previous Notice, DOE invited public comments on the Draft

  16. Savannah River Analytical Laboratories Achieve International Standard

    National Nuclear Security Administration (NNSA)

    Accreditation | National Nuclear Security Administration Blog Savannah River Analytical Laboratories Achieve International Standard Accreditation Tuesday, September 8, 2015 - 12:55pm Savannah River National Laboratory's F/H Analytical Laboratories have achieved ISO/IEC 17025 accreditation, which represents an independent validation of two analytical methods against a set of world-class specifications. The accreditation was formally awarded by the American Association for Laboratory

  17. Rebecca Sharitz | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sharitz Research Teaching Selected Publications Faculty & Scientists SREL Home UGA Plant Biology Rebecca Sharitz Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5679 office (803) 725-3309 fax sharitz(at)srel.uga.edu The research in my laboratory is directed chiefly toward ecological processes in wetlands, including factors affecting the structure and function of river floodplain and swamp forest ecosystems and of isolated depression wetlands (Carolina bays),

  18. Columbia River Component Data Gap Analysis

    SciTech Connect (OSTI)

    L. C. Hulstrom

    2007-10-23

    This Data Gap Analysis report documents the results of a study conducted by Washington Closure Hanford (WCH) to compile and reivew the currently available surface water and sediment data for the Columbia River near and downstream of the Hanford Site. This Data Gap Analysis study was conducted to review the adequacy of the existing surface water and sediment data set from the Columbia River, with specific reference to the use of the data in future site characterization and screening level risk assessments.

  19. Indian River Hydroelectric Project Grant

    SciTech Connect (OSTI)

    Rebecca Garrett

    2005-04-29

    This Final Technical Report provides a concise retrospective and summary of all facets of the Sheldon Jackson College electrical Infrastructure Renovation portion of the Indian River Hydroelectric Project Grant of the City and Borough of Sitka, Alaska. The Project Overview describes the origins of the project, the original conditions that provided the impetus for the grant funding, how the grant amendment was developed, the conceptual design development, and the actual parameters of the final project as it went out to bid. The Project Overview also describes the ''before and after'' conditions of the project. The Objectives division of this Final Technical Report describes the amendment-funded goals of the project. It also describes the milestones of project development and implementation, as well as, the rationale behind the milestone array. The Description of Activities Performed division of this report provides an in-depth chronological analysis of progressive project implementation. Photographs will provide further illustration of particular functional aspects of the renovation project within project parameters. The Conclusions and Recommendations division of this report provides a comprehensive retrospective analysis of the project.

  20. Mesaba next-generation IGCC plant

    SciTech Connect (OSTI)

    2006-01-01

    Through a US Department of Energy (DOE) cooperative agreement awarded in June 2006, MEP-I LLC plans to demonstrate a next generation integrated gasification-combined cycle (IGCC) electric power generating plant, the Mesaba Energy Project. The 606-MWe plant (the first of two similarly sized plants envisioned by project sponsors) will feature next-generation ConocoPhillips E-Gas{trademark} technology first tested on the DOE-funded Wabash River Coal Gasification Repowering project. Mesaba will benefit from recommendations of an industry panel applying the Value Improving Practices process to Wabash cost and performance results. The project will be twice the size of Wabash, while demonstrating better efficient, reliability and pollutant control. The $2.16 billion project ($36 million federal cost share) will be located in the Iron Range region north of Duluth, Minnesota. Mesaba is one of four projects selected under Round II of the Clean Coal Power Initiative. 1 fig.

  1. Columbia River monitoring: Distribution of tritium in Columbia River water at the Richland Pumphouse

    SciTech Connect (OSTI)

    Dirkes, R.L.

    1993-02-01

    The Surface Environmental Surveillance Project (SESP) is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This report presents the results of a special study conducted as part of the SESP to supplement the routine Columbia River monitoring program and provide information relative to the dispersion and distribution of Hanford origin contaminants entering the river through the seepage of ground water along the Hanford Site. Sampling was conducted along cross sections to determine the distribution of tritium within the Columbia River at Richland, Washington. The investigation was also designed to evaluate the relationship between the average tritium concentrations in the river water at this location and in water collected from the routine SESP river monitoring system located at the city of Richland drinking water intake (Richland Pumphouse). This study was conducted during the summers of 1987 and 1988. Water samples were collected along cross sections located at or near the Richland Pumphouse monitoring station.

  2. Hispanic Heritage Month

    Broader source: Energy.gov [DOE]

    The future of America is inextricably linked to the future of our Hispanic community. Our country thrives on the diversity and ingenuity of all our people, and our ability to out innovate, out...

  3. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect (OSTI)

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and Waste Management Environmental Impact Statement is completed and a Record of Decision is issued by DOE. Technical solutions are being developed to mitigate the impact from substantially increased estimates of sodium to be added during pretreatment of the tank waste solids. This may involve one or more of the following options: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, (4) increasing the incorporation of aluminum in the HLW glass to reduce caustic leaching requirements, or (5) implementing other technical solutions. For planning purposes, the PMB assumes that option (5) above, in the form of an ARF, will be successful in reducing the sodium required to be added during pretreatment of the tank waste.

  4. Coho Salmon Master Plan, Clearwater River Basin.

    SciTech Connect (OSTI)

    Nez Perce Tribe; FishPro

    2004-10-01

    The Nez Perce Tribe has a desire and a goal to reintroduce and restore coho salmon to the Clearwater River Subbasin at levels of abundance and productivity sufficient to support sustainable runs and annual harvest. Consistent with the Clearwater Subbasin Plan (EcoVista 2003), the Nez Perce Tribe envisions developing an annual escapement of 14,000 coho salmon to the Clearwater River Subbasin. In 1994, the Nez Perce Tribe began coho reintroduction by securing eggs through U.S. v. Oregon; by 1998 this agreement provided an annual transfer of 550,000 coho salmon smolts from lower Columbia River hatchery facilities for release in the Clearwater River Subbasin. In 1998, the Northwest Power and Conservation Council authorized the Bonneville Power Administration to fund the development of a Master Plan to guide this reintroduction effort. This Master Plan describes the results of experimental releases of coho salmon in the Clearwater River Subbasin, which have been ongoing since 1995. These data are combined with results of recent coho reintroduction efforts by the Yakama Nation, general coho life history information, and historical information regarding the distribution and life history of Snake River coho salmon. This information is used to assess a number of alternative strategies aimed at restoring coho salmon to historical habitats in the Clearwater River subbasin. These data suggest that there is a high probability that coho salmon can be restored to the Clearwater River subbasin. In addition, the data also suggest that the re-establishment of coho salmon could be substantially aided by: (1) the construction of low-tech acclimation facilities; (2) the establishment of a 'localized' stock of coho salmon; and (3) the construction of hatchery facilities to provide a source of juvenile coho salmon for future supplementation activities. The Nez Perce Tribe recognizes that there are factors which may limit the success of coho reintroduction. As a result of these uncertainties, the Nez Perce Tribe proposes to utilize a phased approach for coho reintroductions. This Master Plan seeks authorization and funding to move forward to Step 2 in the Northwest Power and Conservation Council 3-Step review process to further evaluate Phase I of the coho reintroduction program, which would focus on the establishment of a localized coho salmon stock capable of enduring the migration to the Clearwater River subbasin. To achieve this goal, the Nez Perce Tribe proposes to utilize space at existing Clearwater River subbasin hatchery facilities in concert with the construction of two low-tech acclimation facilities, to capitalize on the higher survival observed for acclimated versus direct stream released coho. In addition, Phase I would document the natural productivity of localized coho salmon released in two targeted tributaries within the Clearwater River subbasin. If Phase I is successful at establishing a localized coho salmon stock in an abundance capable of filling existing hatchery space, the rates of natural productivity are promising, and the interspecific interactions between coho and sympatric resident and anadromous salmonids are deemed acceptable, then Phase II would be triggered. Phase II of the coho reintroduction plan would focus on establishing natural production in a number of Clearwater River subbasin tributaries. To accomplish this goal, Phase II would utilize existing Clearwater River subbasin hatchery facilities, and expand facilities at the Nez Perce Tribal Hatchery Site 1705 facility to rear approximately 687,700 smolts annually for use in a rotating supplementation schedule. In short, this document identifies a proposed alternative (Phase I), complete with estimates of capital, operations and maintenance, monitoring and evaluation, and permitting that is anticipated to raise average smolt replacement rates from 0.73 (current) to 1.14 using primarily existing facilities, with a limited capital investment for low-tech acclimation facilities. This increase in survival is expected to provide the opportunity for the establishm

  5. New River Geothermal Exploration (Ram Power Inc.)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Miller, Clay

    The New River Geothermal Exploration (DOE Award No. EE0002843) is located approximately 25km south of the Salton Sea, near town of Brawley in Imperial County and approximately 150km east of San Diego, California. A total of 182 MT Logger sites were completed covering the two separate Mesquite and New River grids. The data was collected over a frequency range of 320Hz to 0.001Hz with variable site spacing. A number of different inversion algorithms in 1D, 2D and 3D were used to produce resistivity-depth profiles and maps of subsurface resistivity variations over the survey area. For 2D inversions, a total of eighteen lines were constructed in east-west and north-south orientations crossing the entire survey area. For MT 3D inversion, the New River property was divided in two sub-grids, Mesquite and New River areas. The report comprises of two parts. For the first part, inversions and geophysical interpretation results are presented with some recommendations of the potential targets for future follow up on the property. The second part of the report describes logistics of the survey, survey parameters, methodology and the survey results (data) in digital documents. The report reviews a Spartan MT survey carried out by Quantec Geoscience Limited over the New River Project in California, USA on behalf of Ram Power Inc. Data was acquired over a period of 29 days from 2010/06/26 to 2010/07/24.

  6. New River Geothermal Exploration (Ram Power Inc.)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Miller, Clay

    2013-11-15

    The New River Geothermal Exploration (DOE Award No. EE0002843) is located approximately 25km south of the Salton Sea, near town of Brawley in Imperial County and approximately 150km east of San Diego, California. A total of 182 MT Logger sites were completed covering the two separate Mesquite and New River grids. The data was collected over a frequency range of 320Hz to 0.001Hz with variable site spacing. A number of different inversion algorithms in 1D, 2D and 3D were used to produce resistivity-depth profiles and maps of subsurface resistivity variations over the survey area. For 2D inversions, a total of eighteen lines were constructed in east-west and north-south orientations crossing the entire survey area. For MT 3D inversion, the New River property was divided in two sub-grids, Mesquite and New River areas. The report comprises of two parts. For the first part, inversions and geophysical interpretation results are presented with some recommendations of the potential targets for future follow up on the property. The second part of the report describes logistics of the survey, survey parameters, methodology and the survey results (data) in digital documents. The report reviews a Spartan MT survey carried out by Quantec Geoscience Limited over the New River Project in California, USA on behalf of Ram Power Inc. Data was acquired over a period of 29 days from 2010/06/26 to 2010/07/24.

  7. Savannah River Site (SRS) environmental overview

    SciTech Connect (OSTI)

    O'Rear, M.G. ); Steele, J.L.; Kitchen, B.G. )

    1990-01-01

    The environmental surveillance activities at and in the vicinity of the Savannah River Site (SRS) (formerly the Savannah River Plant (SRP)) comprise one of the most comprehensive and extensive environmental monitoring programs in the United States. This overview contains monitoring data from routine and nonroutine radiological and nonradiological environmental surveillance activities, summaries of environmental protection programs in progress, a summary of National Environmental Policy Act (NEPA) activities, and a listing of environmental permits (Appendix A) issued by regulatory agencies. This overview provides information about the impact of SRS operations on the public and the environment. The SRS occupies a large area of approximately 300 square miles along the Savannah River, principally in Aiken and Barnwell counties of South Carolina. SRS's primary function is the production of tritium, plutonium, and other special nuclear materials for national defense, for other governmental uses, and for some civilian purposes. From August 1950 to March 31, 1989, SRS was operated for the Department of Energy (DOE) by E. I. du Pont de Nemours Co. On April 1, 1989 the Westinghouse Savannah River Company assumed responsibility as the prime contractor for the Savannah River Site.

  8. Historical river flow rates for dose calculations

    SciTech Connect (OSTI)

    Carlton, W.H.

    1991-06-10

    Annual average river flow rates are required input to the LADTAP Computer Code for calculating offsite doses from liquid releases of radioactive materials to the Savannah River. The source of information on annual river flow rates used in dose calculations varies, depending on whether calculations are for retrospective releases or prospective releases. Examples of these types of releases are: Retrospective - releases from routine operations (annual environmental reports) and short term release incidents that have occurred. Prospective - releases that might be expected in the future from routine or abnormal operation of existing or new facilities (EIS`s, EID`S, SAR`S, etc.). This memorandum provides historical flow rates at the downstream gauging station at Highway 301 for use in retrospective dose calculations and derives flow rate data for the Beaufort-Jasper and Port Wentworth water treatment plants.

  9. River Protection Project (RPP) Level 0 Logic

    SciTech Connect (OSTI)

    SEEMAN, S.E.

    2000-01-20

    The following modifications were made to the River Protection Project Level-0 logic in going from Rev. I to Rev. 2. The first change was the change to the heading at the top of the drawing: ''TWRS Program Logic'' to ''River Protection Project Mission Logic''. Note that purely format changes (e.g., fonts, location of boxes, date format, addition of numbers to ''ghost'' boxes) are not discussed. However, the major format change was to show DOE-BNFL Inc. Interface Control Documents (ICDs) on the logic.

  10. Sun River Electric Coop, Inc | Open Energy Information

    Open Energy Info (EERE)

    River Electric Coop, Inc Jump to: navigation, search Name: Sun River Electric Coop, Inc Place: Montana Phone Number: 1-406-467-2526 Website: www.sunriverelectric.coop Outage...

  11. Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity

    Broader source: Energy.gov [DOE]

    College intern Spencer Isom recently began her second summer with Savannah River Remediation (SRR), and her fourth year at Savannah River Site (SRS), where she continues a 31-year family legacy on site.

  12. City of Park River, North Dakota (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Park River, North Dakota (Utility Company) Jump to: navigation, search Name: City of Park River Place: North Dakota Phone Number: 701.284.6150 Website: www.parkrivernd.govoffice2.c...

  13. Preliminary Notice of Violation, Savannah River Nuclear Solutions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fall from a Scaffold in the K-Area Complex at the Savannah River Site On November 9, ... an elevated work platform in the K-Area Complex at the Savannah River Site on July 1, ...

  14. BLM Four Rivers Field Office | Open Energy Information

    Open Energy Info (EERE)

    Four Rivers Field Office Jump to: navigation, search Name: BLM Four Rivers Field Office Address: 3948 Development Ave. Place: Boise, ID Zip: 83705 Phone Number: 208-384-3300...

  15. EA-366 TWIN RIVERS PAPER CO INC. | Department of Energy

    Energy Savers [EERE]

    Twin Rivers Paper Co to export electric energy to Canada. PDF icon EA-366 Twin Rivers CN.pdf More Documents & Publications Application to Export Electric Energy OE Docket No....

  16. SAVANNAH RIVER TECHNOLOGY CENTER MONTHLY REPORT AUGUST 1992

    SciTech Connect (OSTI)

    Ferrell, J.M.

    1999-06-21

    'This monthly report summarizes Programs and Accomplishments of the Savannah River Technology Center in support of activities at the Savannah River Site. The following categories are addressed: Reactor, Tritium, Separations, Environmental, Waste Management, General, and Items of Interest.'

  17. Type B Accident Investigation Board Report of the Savannah River...

    Energy Savers [EERE]

    Savannah River Site Hand Injury at the Salt Waste Processing Facility on October 6, 2009 Type B Accident Investigation Board Report of the Savannah River Site Hand Injury at the ...

  18. Preliminary Notice of Violation, Savannah River Nuclear Solutions...

    Broader source: Energy.gov (indexed) [DOE]

    Preliminary Notice of Violation issued to Savannah River Nuclear Solutions, LLC related to a Nitric Acid Spill Event and an Electrical Arc Flash Injury Event at the Savannah River ...

  19. Preliminary Notice of Violation,Savannah River Nuclear Solutions...

    Broader source: Energy.gov (indexed) [DOE]

    July 22, 2011 Issued to Savannah River Nuclear Solutions, LLC related to a Puncture Wound Injury resulting in a Radiological Uptake at the Savannah River Site On July 22, 2011, the ...

  20. Type B Accident Investigation of the Savannah River Site Arc...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the Savannah River Site Arc Flash Burn Injury on September 23, 2009, in the D Area Powerhouse Type B Accident Investigation of the Savannah River Site Arc Flash Burn Injury on ...

  1. Madelyn Creedon visits Savannah River Site | National Nuclear...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Savannah River Site Thursday, March 12, 2015 - 4:48pm NNSA Blog This week, NNSA Principal Deputy Administrator Madelyn Creedon was at the Savannah River Site. She visited the ...

  2. Learn More About EM's Savannah River Site Technology at Small...

    Broader source: Energy.gov (indexed) [DOE]

    Learn More About EM's Savannah River Site Technology at Small Business Forum This Month To ... Small Business Forum is Set for May 19-20, 2016 Learn More About EM's Savannah River Site ...

  3. Deep drilling data Raft River geothermal area, Idaho | Open Energy...

    Open Energy Info (EERE)

    data Raft River geothermal area, Idaho Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Deep drilling data Raft River geothermal area, Idaho Abstract...

  4. Subsurface geology of the Raft River geothermal area, Idaho ...

    Open Energy Info (EERE)

    geology of the Raft River geothermal area, Idaho Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Proceedings: Subsurface geology of the Raft River...

  5. Exhibit D: Mirant Potomac River Schedule of Unit Operations:...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: January - March 2006 Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit ...

  6. Exhibit D: Mirant Potomac River Schedule of Unit Operations:...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 4, January - March 2006 Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit Operations in ...

  7. Black River Farm Solar Project | Open Energy Information

    Open Energy Info (EERE)

    Solar Project Facility Black River Farm Solar Project Sector Solar Facility Type Fixed Tilt Ground-Mount & Roof-Mount Owner EnXco Developer EnXco Energy Purchaser Black River Farm...

  8. Direct-Current Resistivity Survey At Raft River Geothermal Area...

    Open Energy Info (EERE)

    surveys were undertaken at the Raft River geothermal area. References Zohdy, A.A.R.; Jackson, D.B.; Bisdorf, R.J. (12 October 1975) Exploring the Raft River geothermal area,...

  9. Salt River Electric Coop Corp | Open Energy Information

    Open Energy Info (EERE)

    River Electric Coop Corp Jump to: navigation, search Name: Salt River Electric Coop Corp Place: Kentucky References: EIA Form EIA-861 Final Data File for 2010 - File1a1 EIA Form...

  10. Savannah River Nuclear Solutions, LLC, Consent Order NCO-2016...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Nuclear Solutions, LLC, Consent Order NCO-2016-01 Savannah River Nuclear Solutions, LLC, Consent Order NCO-2016-01 April 19, 2016 Nuclear Safety Enforcement Consent ...

  11. Title 10 Chapter 45 Connecticut River Flood Control Compact ...

    Open Energy Info (EERE)

    5 Connecticut River Flood Control Compact Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 10 Chapter 45 Connecticut River...

  12. Peace River Electric Coop, Inc | Open Energy Information

    Open Energy Info (EERE)

    Peace River Electric Coop, Inc Jump to: navigation, search Name: Peace River Electric Coop, Inc Place: Florida Phone Number: 1-877-282-3656 Website: www.preco.coop Outage Hotline:...

  13. Red River Valley Coop Pwr Assn | Open Energy Information

    Open Energy Info (EERE)

    Red River Valley Coop Pwr Assn Jump to: navigation, search Name: Red River Valley Coop Pwr Assn Place: Minnesota Website: www.rrvcoop.com Facebook: https:www.facebook.comRRVCPA...

  14. Savannah River Site Manager Jack Craig Wins Highest Civil Service...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Site Manager Jack Craig Wins Highest Civil Service Award Savannah River Site Manager Jack Craig Wins Highest Civil Service Award December 29, 2015 - 1:00pm Addthis ...

  15. South River Elec Member Corp | Open Energy Information

    Open Energy Info (EERE)

    River Elec Member Corp Jump to: navigation, search Name: South River Elec Member Corp Place: North Carolina Phone Number: (910) 892-8071 Website: www.sremc.com Twitter: https:...

  16. Millions of Columbia River salmon return home in 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wind River. BPA funded a habitat restoration project on the river and helped bring fish back. A few years ago, there were no salmon in the Little Wind, this fall hundreds...

  17. U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER ...

    Office of Environmental Management (EM)

    * SAVANNAH RIVER SITE * AIKEN * SC from Savannah River National Laboratory srnl.doe.gov ... Ashtabula, Fernald, Mound and Kansas City Plant, and larger sites such as Oak Ridge, Los ...

  18. Savannah River's Biomass Steam Plant Success with Clean and Renewable...

    Office of Environmental Management (EM)

    Page 1 of 2 Savannah River Site South Carolina Savannah River's Biomass Steam Plant Success with Clean and Renewable Energy Challenge In order to meet the federal energy and ...

  19. Savannah River Ecology Laboratory 2005 Annual Technical Progress Report

    SciTech Connect (OSTI)

    Paul M. Bertsch

    2005-07-19

    2005 annual report of research conducted by the Savannah River Ecology Laboratory, a research unit of The University of Georgia operating on the Savannah River Site, Aiken, South Carolina

  20. Savannah River Ecology Laboratory FY2006 Annual Technical Progress Report

    SciTech Connect (OSTI)

    Paul M. Bertsch

    2006-10-23

    FY2006 annual report of research conducted by the Savannah River Ecology Laboratory, a research unit of the University of Georgia operating on the Savannah River Site in Aiken, County, SC.

  1. Savannah River Ecology Laboratory 2004 Annual Technical Progress Report

    SciTech Connect (OSTI)

    Paul M. Bertsch

    2004-07-29

    2004 annual report of research conducted by the Savannah River Ecology Laboratory, a research unit of The University of Georgia operating on the Savannah River Site in Aiken, South Carolina

  2. Indian River County, Florida: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    is classified as ASHRAE 169-2006 Climate Zone Number 2 Climate Zone Subtype A. Registered Energy Companies in Indian River County, Florida Climatic Solar Places in Indian River...

  3. 2,"Big Bend Dam","Hydroelectric","USCE-Missouri River District...

    U.S. Energy Information Administration (EIA) Indexed Site

    River District",714 2,"Big Bend Dam","Hydroelectric","USCE-Missouri River District",520 3,"Big Stone","Coal","Otter Tail Power Co",475.6 4,"Fort Randall","Hydroelectric","USCE-Mis...

  4. Mirant Potomac River, LLC, Monthly Model Evaluation Study Report...

    Energy Savers [EERE]

    January 2007 Mirant Potomac River, LLC, Monthly Model Evaluation Study Report, January 2007 Docket No. EO-05-01. Order No. 202-07-02: As you are aware, Mirant Potomac River, L.L.C,...

  5. Mirant Potomac River, LLC, Monthly Model Evaluation Study Report...

    Energy Savers [EERE]

    March 2007 Mirant Potomac River, LLC, Monthly Model Evaluation Study Report, March 2007 Docket No. EO-05-01. Order No. 202-07-02: As you are aware, Mirant Potomac River, L.L.C,...

  6. Mirant Potomac River, LLC, Monthly Model Evaluation Study Report...

    Office of Environmental Management (EM)

    February 2007 Mirant Potomac River, LLC, Monthly Model Evaluation Study Report, February 2007 Docket No. EO-05-01. Order No. 202-07-02: As you are aware, Mirant Potomac River,...

  7. Texas River Authority Website Links | Open Energy Information

    Open Energy Info (EERE)

    Legal Document- OtherOther: Texas River Authority Website LinksLegal Abstract The Texas Parks and Wildlife Department provides information on and links to each of the 23 river...

  8. City of Wood River, Nebraska (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    City of Wood River, Nebraska (Utility Company) Jump to: navigation, search Name: Wood River Municipal Power Place: Nebraska Phone Number: 308.583-2515; 308-583-2066 Website:...

  9. CRAD, Engineering - Office of River Protection K Basin Sludge...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Engineering - Office of River Protection K Basin Sludge Waste System CRAD, Engineering - Office of River Protection K Basin Sludge Waste System May 2004 A section of Appendix C to ...

  10. Evaluate Status of Pacific Lamprey in the Clearwater River and Salmon River Drainages, Idaho, 2009 Technical Report.

    SciTech Connect (OSTI)

    Cochnauer, Tim; Claire, Christopher

    2009-05-07

    Pacific lamprey Lampetra tridentata have received little attention in fishery science until recently, even though abundance has declined significantly along with other anadromous fish species in Idaho. Pacific lamprey in Idaho have to navigate over eight lower Snake River and Columbia River hydroelectric facilities for migration downstream as juveniles to the Pacific Ocean and again as adults migrating upstream to their freshwater spawning grounds in Idaho. The number of adult Pacific lamprey annually entering the Snake River basin at Ice Harbor Dam has declined from an average of over 18,000 during 1962-1969 to fewer than 600 during 1998-2006. Based on potential accessible streams and adult escapement over Lower Granite Dam on the lower Snake River, we estimate that no more than 200 Pacific lamprey adult spawners annually utilize the Clearwater River drainage in Idaho for spawning. We utilized electrofishing in 2000-2006 to capture, enumerate, and obtain biological information regarding rearing Pacific lamprey ammocoetes and macropthalmia to determine the distribution and status of the species in the Clearwater River drainage, Idaho. Present distribution in the Clearwater River drainage is limited to the lower sections of the Lochsa and Selway rivers, the Middle Fork Clearwater River, the mainstem Clearwater River, the South Fork Clearwater River, and the lower 7.5 km of the Red River. In 2006, younger age classes were absent from the Red River.

  11. The Savannah River Site is owned by the U.S. Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Jeffrey Griffin Associate Laboratory Director, Environmental Stewardship Savannah River National Laboratory Savannah River Nuclear Solutions, LLC Georgia Southern College Bachelor ...

  12. The Savannah River Site is owned by the U.S. Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Associate Laboratory Director, Nuclear Materials Management Programs Savannah River National Laboratory Savannah River Nuclear Solutions, LLC Indian Institute of Technology, ...

  13. Preliminary Notice of Violation, Westinghouse Savannah River Company- EA-2000-02

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company, related to Procurement Quality Assurance and Quality Improvement Deficiencies at the Savannah River Site.

  14. Washington Closure Hanford: Ten Years of River Corridor Cleanup

    Broader source: Energy.gov [DOE]

    This timeline shows contractor Washington Closure Hanford's accomplishments over the past 10 years through its River Corridor Closure Contract.

  15. U. S. Department of Energy Savannah River Operations Office - Mission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission Savannah River Operations Office Mission Welcome to the Savannah River Operations Office (DOE-SR) website. DOE-SR is a U.S. Department of Energy (DOE) organization that serves as the landlord for site resources and is responsible for overseeing the work performed by the Savannah River Site's (SRS) contractors. The Savannah River Site (SRS) is a key DOE industrial complex dedicated to; environmental cleanup, nuclear weapons stockpile stewardship, and nuclear materials disposition, in

  16. Independent Oversight Follow-up Review, Savannah River National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - January 2012 | Department of Energy Savannah River National Laboratory - January 2012 Independent Oversight Follow-up Review, Savannah River National Laboratory - January 2012 January 2012 Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site This report provides the results of an independent review of the identification and implementation of safety basis hazard controls associated with "flashing spray release"

  17. Independent Oversight Inspection, Savannah River Site Office - December

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2009 | Department of Energy Savannah River Site Office - December 2009 Independent Oversight Inspection, Savannah River Site Office - December 2009 December 2009 Inspection of Nuclear Safety at the Savannah River Site Office and the Tritium Program Facilities This report documents the results of an inspection of nuclear safety at several National Nuclear Security Administration (NNSA) facilities located at Department of Energy's (DOE) Savannah River Site. The inspection was performed during

  18. White River Valley Electric Cooperative- Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    The White River Electric Coop's Rebate Program offers both residential and commercial rebates. Items available in the program include:

  19. Savannah River Site Achieves Waste Transfer First | Department of Energy

    Office of Environmental Management (EM)

    Department of Energy Savannah River Nuclear Solutions, LLC, Consent Order NCO-2016-01 Savannah River Nuclear Solutions, LLC, Consent Order NCO-2016-01 April 19, 2016 Nuclear Safety Enforcement Consent Order issued to Savannah River Nuclear Solutions, LLC relating to nuclear criticality safety infractions that occurred at the Savannah River Sit On April 19, 2016, the U.S. Department of Energy (DOE) Office of Enterprise Assessments' Office of Enforcement issued a Consent Order (NCO-2016-01) to

  20. Workplace Charging Challenge Partner: Salt River Project | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Salt River Project Workplace Charging Challenge Partner: Salt River Project Workplace Charging Challenge Partner: Salt River Project Joined the Challenge: December 2014 Headquarters: Tempe, AZ Charging Locations: Phoenix, AZ; Scottsdale, AZ; Tempe, AZ; Tolleson, AZ Domestic Employees: 4,900 The mission of Salt River Project's (SRP) Electric Vehicle Initiative is to encourage greater use of clean energy transportation. Under this program, SRP's headquarters received two Level 2

  1. Deep Challenges for Foundation Performance at Savannah River Site

    Broader source: Energy.gov [DOE]

    Deep Challenges for Foundation Performance at Savannah River Site Frank H. Syms and Brent Gutierrez October 22, 2014

  2. Independent Oversight Review, Savannah River Site- August 2011

    Broader source: Energy.gov [DOE]

    Review of Commercial Grade Dedication Plans for the Safety Instrumented System at the Savannah River Site Waste Solidification Building Project

  3. Voluntary Protection Program Onsite Review, Washington River Protection

    Energy Savers [EERE]

    Solutions, LLC, Hanford - Feb 2014 | Department of Energy Washington River Protection Solutions, LLC, Hanford - Feb 2014 Voluntary Protection Program Onsite Review, Washington River Protection Solutions, LLC, Hanford - Feb 2014 February 13, 2014 Evaluation to determine whether Washington River Protection Solutions, LLC, Hanford is performing at a level deserving DOE-VPP Star recognition. PDF icon Voluntary Protection Program Onsite Review, Washington River Protection Solutions, LLC, Hanford

  4. Savannah River Site - Salt Waste Processing Facility Independent Technical

    Energy Savers [EERE]

    Review | Department of Energy Facility Independent Technical Review Savannah River Site - Salt Waste Processing Facility Independent Technical Review Full Document and Summary Versions are available for download PDF icon Savannah River Site - Salt Waste Processing Facility Independent Technical Review PDF icon Summary - Salt Waste Processing Facility Design at the Savannah River Site More Documents & Publications Savannah River Site - Salt Waste Processing Facility: Briefing on the Salt

  5. 2011 Annual Planning Summary for Savannah River Operations Office (SRS) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Savannah River Operations Office (SRS) 2011 Annual Planning Summary for Savannah River Operations Office (SRS) The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Savannah River Operations Office (SRS) (See also Environmental Management). PDF icon 2011 Annual Planning Summary for Savannah River Operations Office (SRS) More Documents & Publications 2011 Annual Planning Summary for Environmental

  6. Raft River III Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Raft River III Geothermal Project Project Location Information Coordinates...

  7. Mighty Microbes Where Rivers Run (Other) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Other: Mighty Microbes Where Rivers Run Citation Details In-Document Search Title: Mighty Microbes Where Rivers Run Microbes and their influential role in Earth's climate take center stage in the area where river water and groundwater mix - an area known as the hyporheic zone. PNNL ecologist James Stegen discusses his team's research in his "laboratory" - the zone along the Columbia, one of the nation's largest rivers. It's a squishy, porous lab, better known for soaking feet than

  8. PIA - Savannah River Nuclear Solution SRNS Electronic Document Workflow

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RECORDS System (EDWS) | Department of Energy SRNS Electronic Document Workflow RECORDS System (EDWS) PIA - Savannah River Nuclear Solution SRNS Electronic Document Workflow RECORDS System (EDWS) PIA - Savannah River Nuclear Solution SRNS Electronic Document Workflow RECORDS System (EDWS) PDF icon PIA - Savannah River Nuclear Solution SRNS Electronic Document Workflow RECORDS System (EDWS) More Documents & Publications PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System

  9. PIA - Savannah River Site Management and Operating Contractor (HRMS) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) PDF icon PIA - Savannah River Site Management and Operating Contractor (HRMS) More Documents & Publications PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA -

  10. Potomac River Project Outage Schedule Clarification | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Docket No. EO-05-01. Order No. 202-07-02: Based on the most current information we have for both circuits, the new outage dates are listed below: Outage Duration Feeder Out April 30, 2007 - June 1, 2007 Circuit 1 June 2, 2007 - July 1, 2007 Circuit 2 PDF icon Potomac River Project Outage Schedule Clarification More Documents & Publications Re: Potomac River Generating Station Department of Energy,

  11. EM Update Newsletter Spotlights River Corridor Cleanup at Hanford Site |

    Office of Environmental Management (EM)

    Department of Energy EM Update Newsletter Spotlights River Corridor Cleanup at Hanford Site EM Update Newsletter Spotlights River Corridor Cleanup at Hanford Site December 17, 2015 - 12:40pm Addthis RICHLAND, Wash. - In this issue of the EM Update newsletter, EM marks the many accomplishments the Richland Operations Office and its contractors have achieved in cleanup along the Columbia River corridor at the Hanford Site. This year marked the 10th anniversary of the River Corridor Closure

  12. EA-2008: Colorado River Storage Project Programmatic Operations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Programmatic Operations and Maintenance Project; Coconino, Maricopa, Navajo, ... EA-2008: Colorado River Storage Project Programmatic Operations and Maintenance Project; ...

  13. Modeling-Computer Simulations At Raft River Geothermal Area ...

    Open Energy Info (EERE)

    navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Modeling-Computer Simulations At Raft River Geothermal Area (1980) Exploration Activity Details...

  14. Modeling-Computer Simulations At Raft River Geothermal Area ...

    Open Energy Info (EERE)

    navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Modeling-Computer Simulations At Raft River Geothermal Area (1979) Exploration Activity Details...

  15. Modeling-Computer Simulations At Raft River Geothermal Area ...

    Open Energy Info (EERE)

    navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Modeling-Computer Simulations At Raft River Geothermal Area (1977) Exploration Activity Details...

  16. Modeling-Computer Simulations At Raft River Geothermal Area ...

    Open Energy Info (EERE)

    navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Modeling-Computer Simulations At Raft River Geothermal Area (1983) Exploration Activity Details...

  17. Categorical Exclusion Determinations: Office of River Protection-Richland

    Energy Savers [EERE]

    Opperations Office | Department of Energy River Protection-Richland Opperations Office Categorical Exclusion Determinations: Office of River Protection-Richland Opperations Office Categorical Exclusion Determinations issued by Office of River Protection-Richland Office. DOCUMENTS AVAILABLE FOR DOWNLOAD July 29, 2014 CX-012727: Categorical Exclusion Determination CHPRC Cleanup Actions CX(s) Applied: B6.1 Date: 41849 Location(s): Washington Offices(s): River Protection-Richland Operations

  18. EM’s Year in Review at Savannah River Site

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – The EM program at the Savannah River Site (SRS) achieved many accomplishments in 2014.

  19. Contractor Fee Payments - Office of River Protection | Department...

    Energy Savers [EERE]

    PDF icon Waste Treatment Plant Design & Construction More Documents & Publications Contractor Fee Payments - Savannah River Operations Office Contractor Fee Payments - ...

  20. Independent Oversight Review, Savannah River Site- July 2011

    Broader source: Energy.gov [DOE]

    Review of Electrical System Configuration Management and Design Change Control at the Savannah River Site, Waste Solidification Building Project

  1. Savannah River Site - Central Shops GW OU | Department of Energy

    Office of Environmental Management (EM)

    Central Shops GW OU Savannah River Site - Central Shops GW OU January 1, 2013 - 12:00pm Addthis US Department of Energy Groundwater Database Groundwater Master Report InstallationName, State: Savannah River Site, SC Responsible DOE Office: Savannah River Site Plume Name: Central Shops GW OU Remediation Contractor: Savannah River Nuclear Solutions, LLC PBS Number: 30 Report Last Updated: 2013 Contaminants Halogenated VOCs/SVOCs Present?: Yes VOC Name Concentration (ppb) Regulatory Driver Cleanup

  2. Savannah River Site - GSA Western | Department of Energy

    Office of Environmental Management (EM)

    GSA Western Savannah River Site - GSA Western January 1, 2013 - 12:00pm Addthis US Department of Energy Groundwater Database Groundwater Master Report InstallationName, State: Savannah River Site, SC Responsible DOE Office: Savannah River Site Plume Name: GSA Western Remediation Contractor: Savannah River Nuclear Solutions, LLC PBS Number: 30 Report Last Updated: 2013 Contaminants Halogenated VOCs/SVOCs Present?: Yes VOC Name Concentration (ppb) Regulatory Driver Cleanup Requirement TCE 34 Yes 5

  3. Savannah River Site - Sanitary Landfill | Department of Energy

    Office of Environmental Management (EM)

    Energy - P-Area Groundwater Operable Unit Savannah River Site - P-Area Groundwater Operable Unit January 1, 2013 - 12:00pm Addthis US Department of Energy Groundwater Database Groundwater Master Report InstallationName, State: Savannah River Site, SC Responsible DOE Office: Savannah River Site Plume Name: P-Area Groundwater Operable Unit Remediation Contractor: Savannah River Nuclear Solutions, LLC PBS Number: 30 Report Last Updated: 2013 Contaminants Halogenated VOCs/SVOCs Present?: Yes VOC

  4. Savannah River National Laboratory Technology Marketing Summaries - Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Innovation Portal Savannah River National Laboratory Technology Marketing Summaries Here you'll find marketing summaries for technologies available for licensing from the Savannah River National Laboratory (SRNL). The summaries provide descriptions of the technologies including their benefits, applications and industries, and development stage. Savannah River National Laboratory 27 Technology Marketing Summaries Category Title and Abstract Laboratories Date Industrial Technologies Startup

  5. PIA - Savannah River Nuclear Solution (SRNS) Energy Employees Occupational

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Illness Compensation Program Act (EEOICPA) | Department of Energy Energy Employees Occupational Illness Compensation Program Act (EEOICPA) PIA - Savannah River Nuclear Solution (SRNS) Energy Employees Occupational Illness Compensation Program Act (EEOICPA) PIA - Savannah River Nuclear Solution (SRNS) Energy Employees Occupational Illness Compensation Program Act (EEOICPA) PDF icon PIA - Savannah River Nuclear Solution (SRNS) Energy Employees Occupational Illness Compensation Program Act

  6. PIA - Savannah River Operations Office Executive Commitment Action Tracking

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System | Department of Energy Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PDF icon PIA - Savannah River Operations Office Executive Commitment Action Tracking System More Documents & Publications PIA - GovTrip (DOE data) PIA - Bonneville Power Adminstration Ethics Helpline

  7. EIS-0268: Shutdown of River Water System at the Savannah River Site

    Broader source: Energy.gov [DOE]

    This EIS evaluates the potential environmental impacts of a proposal to shut down the Savannah R]ver Site River Water System in order to save money; that is, to prevent further expenditure of the...

  8. Wabash Valley Power Association (28 Member Cooperatives)- Residential Energy Efficiency Program

    Broader source: Energy.gov [DOE]

    WVPA also has programs in place to help customers pursue Touchstone Energy Homes, help manage peak loads, and to provide home energy assessments. Contact WVPA or visit the website listed above fo...

  9. The Savannah River Site's groundwater monitoring program

    SciTech Connect (OSTI)

    Not Available

    1991-10-18

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by EPD/EMS in the first quarter of 1991. In includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program's activities and rationale, and serves as an official document of the analytical results.

  10. Savannah River Laboratory monthly report, February 1992

    SciTech Connect (OSTI)

    Ferrell, J.M.; Ice, L.W.

    1992-02-01

    This report is a progress report for the Savannah River Laboratory for the month of February 1992. The progress and activities in six categories were described in the report. The categories are reactor, tritium, separations, environmental, waste management, and general. Each category described numerous and varied activities. Some examples of these activities described are such things as radiation monitoring, maintenance, modifications, and remedial action.

  11. Savannah River Technology Center. Monthly report

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    This is a monthly progress report from the Savannah River Laboratory for the month of January 1993. It has sections with work in the areas of reactor safety, tritium processes and absorption, separations programs and wastes, environmental concerns and responses, waste management practices, and general concerns.

  12. Land Use Baseline Report Savannah River Site

    SciTech Connect (OSTI)

    Noah, J.C.

    1995-06-29

    This document is to serve as a resource for Savannah River Site managers, planners, and SRS stakeholders by providing a general description of the site and land-use factors important to future use decisions and plans. The intent of this document is to be comprehensive in its review of SRS and the surrounding area.

  13. Metal pollution of river Msimbazi, Tanzania

    SciTech Connect (OSTI)

    Ak'habuhaya, J.; Lodenius, M. )

    1988-01-01

    The Misimbazi River in Dar es Salaam is polluted with industrial, urban and agricultural waste waters. A preliminary investigation on the extent of metal pollution (Hg, Cr, Cu, Zn, Fe, Ni, Cd, Mn, Al) was made from samples of sediments and biological indicators. The metal concentrations were in general low, but some of our results indicated industrial pollution.

  14. The Savannah River Site's Groundwater Monitoring Program

    SciTech Connect (OSTI)

    Not Available

    1992-08-03

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted during the first quarter of 1992. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official document of the analytical results.

  15. Savannah River Technology Center. Monthly report

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This document contains information about the research programs being conducted at the Savannah River Plant. Topics of discussion include: thermal cycling absorption process, development of new alloys, ion exchange, oxalate precipitation, calcination, environmental research, remedial action, ecological risk assessments, chemical analysis of salt cakes, natural phenomena hazards assessment, and sampling of soils and groundwater.

  16. EIS-0351: Operation of Flaming Gorge Dam, Colorado River Storage Project, Colorado River, UT

    Broader source: Energy.gov [DOE]

    The Secretary of the United States Department of the Interior (Secretary), acting through the Bureau of Reclamation (Reclamation), is considering whether to implement a proposed action under which Flaming Gorge Dam would be operated to achieve the flow and temperature regimes recommended in the September 2000 report Flow and Temperature Recommendations for Endangered Fishes in the Green River Downstream of Flaming Gorge Dam (2000 Flow and Temperature Recommendations), published by the Upper Colorado River Endangered Fish Recovery Program (Recovery Program).

  17. RIVER-RAD: A computer code for simulating the transport of radionuclides in rivers

    SciTech Connect (OSTI)

    Hetrick, D.M.; McDowell-Boyer, L.M.; Sjoreen, A.L.; Thorne, D.J.; Patterson, M.R.

    1992-11-01

    A screening-level model, RIVER-RAD, has been developed to assess the potential fate of radionuclides released to rivers. The model is simplified in nature and is intended to provide guidance in determining the potential importance of the surface water pathway, relevant transport mechanisms, and key radionuclides in estimating radiological dose to man. The purpose of this report is to provide a description of the model and a user's manual for the FORTRAN computer code.

  18. RIVER-RAD: A computer code for simulating the transport of radionuclides in rivers

    SciTech Connect (OSTI)

    Hetrick, D.M.; McDowell-Boyer, L.M.; Sjoreen, A.L.; Thorne, D.J.; Patterson, M.R.

    1992-11-01

    A screening-level model, RIVER-RAD, has been developed to assess the potential fate of radionuclides released to rivers. The model is simplified in nature and is intended to provide guidance in determining the potential importance of the surface water pathway, relevant transport mechanisms, and key radionuclides in estimating radiological dose to man. The purpose of this report is to provide a description of the model and a user`s manual for the FORTRAN computer code.

  19. Wind River Watershed Restoration: 1999 Annual Report.

    SciTech Connect (OSTI)

    Connolly, Patrick J.

    2001-09-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its first year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey--Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW). Following categories given in the FY1999 Statement of Work, the broad categories, the related objectives, and the entities associated with each objective (lead entity in boldface) were as follows: Coordination--Objective 1: Coordinate the Wind River watershed Action Committee (AC) and Technical Advisory Committee (TAC) to develop a prioritized list of watershed enhancement projects. Monitoring--Objective 2: Monitor natural production of juvenile, smolt, and adult steelhead in the Wind River subbasin. Objective 3: Evaluate physical habitat conditions in the Wind River subbasin. Assessment--Objective 4: Assess watershed health using an ecosystem-based diagnostic model that will provide the technical basis to prioritize out-year restoration projects. Restoration--Objective 5: Reduce road related sediment sources by reducing road densities to less than 2 miles per square mile. Objective 6: Rehabilitate riparian corridors, flood plains, and channel morphology to reduce maximum water temperatures to less than 61 F, to increase bank stability to greater than 90%, to reduce bankfull width to depth ratios to less than 30, and to provide natural levels of pools and cover for fish. Objective 7: Maintain and evaluate passage for adult and juvenile steelhead at artificial barriers. Education--Objective 8: Promote watershed stewardship among students, the community, private landowners, and local governments. Progress towards six of eight of these objectives is described within nine separate reports included in a four-volume document.

  20. Energy-water challenge emerges in Colorado River flows

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy-water challenge emerges in Colorado River flows At the Bradbury Latest Issue:May 2016 all issues All Issues » submit Energy-water challenge emerges in Colorado River flows Climate-driven heat-stress and forest mortality on the Colorado River watershed are expected to reduce river flows basin-wide out to the year 2100. May 1, 2016 Research at Los Alamos National Laboratory indicates that the combination of climate-driven heat-stress and forest mortality on the Colorado River watershed are