Powered by Deep Web Technologies
Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Project title:  

Broader source: Energy.gov (indexed) [DOE]

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

2

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Title: DEVELOPING A Title: DEVELOPING A COMPREHENSIVE RISK ASSESMENT FRAMEWORK FOR GEOLOGICAL STORAGE OF CO2 Ian Duncan University of Texas U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline 1. Benefit to the Program 2. Goals and Objectives 3. Technical Status Project 4. Accomplishments to Date 5. Summary 3 Benefit to the Program The research project is developing a comprehensive understanding of the programmatic (business), and technical risks associated with CCS particularly the likelihood of leakage and its potential consequences. This contributes to the Carbon Storage Program's effort of ensuring 99 percent CO

3

RECIPIENT:WA Dept. of Commerce STATE: WA PROJECT SEP ARRA SIRTI -  

Broader source: Energy.gov (indexed) [DOE]

WA Dept. of Commerce STATE: WA WA Dept. of Commerce STATE: WA PROJECT SEP ARRA SIRTI - Demand Energy - Energy Storage System Tied to Solar on Commercial Facility TITLE: Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-FOA-0000052 DE-EEOOO0139 GFO-o000139-031 Based on my review ofthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution;

4

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

5

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

6

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

7

PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

Richmond Richmond PROJECT TITLE: EECBG - Solar Compactors and Recycling Units Page 1 of2 STATE: VA Funding Opportunity Announcement Number DE-FOA-0000013 Procurement Instrument Number DE-EE0000878 NEPA Control Number cm Number GFO-0000878-003 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

8

PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

Baltimore Baltimore PROJECT TITLE: EECBG - GHG Scrubbing System Page 1 of2 STATE: MD Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-EE0000738 GFO-0000738-002 0 Based all my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: All Technical advice and planning assistance to international, national, state, and local organizations. 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

9

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

10

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve into teams and having each team use a different m-health data collection tool (e.g., cellular phones, smart health patterns. The Tech Fellow, Jacqueline Ferguson, will assist in creating an m-health project

Gray, Jeffrey J.

11

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit to the Program * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * This research project develops a reservoir scale CO 2 plume migration model at the Sleipner project, Norway. The Sleipner project in the Norwegian North Sea is the world's first commercial scale geological carbon storage project. 4D seismic data have delineated the CO 2 plume migration history. The relatively long history and high fidelity data make

12

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Test and Evaluation of Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background information - Project Concept (MICP) - Ureolytic Biomineralization, Biomineralization Sealing * Accomplishments to Date - Site Characterization - Site Preparation - Experimentation and Modeling - Field Deployable Injection Strategy Development * Summary

13

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LBNL's Consolidated Sequestration Research Program (CSRP) Project Number FWP ESD09-056 Barry Freifeld Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefits and Goals of GEO-SEQ * Technical Status - Otway Project (CO2CRC) - In Salah (BP, Sonatrach and Statoil) - Ketzin Project (GFZ, Potsdam) - Aquistore (PTRC) * Accomplishments and Summary * Future Plans 3 Benefit to the Program * Program goals being addressed: - Develop technologies to improve reservoir storage capacity estimation - Develop and validate technologies to ensure 99 percent storage permanence.

14

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline I. Benefits II. Project Overview III. Technical Status A. Background B. Results IV. Accomplishments V. Summary 3 Benefit to the Program * Program goals. - Prediction of CO 2 storage capacity. * Project benefits. - Workforce/Student Training: Support of 3 student GAs in use of multiphase flow and geochemical models simulating CO 2 injection. - Support of Missouri DGLS Sequestration Program. 4 Project Overview: Goals and Objectives Project Goals and Objectives. 1. Training graduate students in use of multi-phase flow models related to CO 2 sequestration. 2. Training graduate students in use of geochemical models to assess interaction of CO

15

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Center for Coal's Center for Coal's FY10 Carbon Sequestration Peer Review February 8 - 12, 2010 2 Collaborators * Tissa Illangasekare (Colorado School of Mines) * Michael Plampin (Colorado School of Mines) * Jeri Sullivan (LANL) * Shaoping Chu (LANL) * Jacob Bauman (LANL) * Mark Porter (LANL) 3 Presentation Outline * Benefit to the program * Project overview * Project technical status * Accomplishments to date * Future Plans * Appendix 4 Benefit to the program * Program goals being addressed (2011 TPP): - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefit: - This project is developing system modeling capabilities that can be used to address challenges associated with infrastructure development, integration, permanence &

16

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Snøhvit CO Snøhvit CO 2 Storage Project Project Number: FWP-FEW0174 Task 4 Principal Investigators: L. Chiaramonte, *J.A. White Team Members: Y. Hao, J. Wagoner, S. Walsh Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Summary & Accomplishments * Appendix 3 Benefit to the Program * The research project is focused on mechanical

17

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

InSalah CO InSalah CO 2 Storage Project Project Number: FWP-FEW0174 Task 2 Principal Investigator: W. McNab Team Members: L. Chiaramonte, S. Ezzedine, W. Foxall, Y. Hao, A. Ramirez, *J.A. White Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Accomplishments * Summary * Appendix 3 Benefit to the Program * The research project is combining sophisticated

18

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Space Geodesy, Seismology, Space Geodesy, Seismology, and Geochemistry for Monitoring Verification and Accounting of CO 2 in Sequestration Sites DE-FE0001580 Tim Dixon, University of South Florida Peter Swart, University of Miami U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to program * Goals & objectives * Preliminary InSAR results (site selection phase) * Project location * Project installed equipment * Specific project results * Summary 3 Benefit to the Program * Focused on monitoring, verification, and accounting (MVA) * If successful, our project will demonstrate the utility of low cost, surface

19

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 DE-FE0001159 Advanced Technologies for Monitoring CO 2 Saturation and Pore Pressure in Geologic Formations Gary Mavko Rock Physics Project/Stanford University 2 Presentation Outline * Benefit to the Program * Project Overview * Motivating technical challenge * Approach * Technical Status - Laboratory results - Theoretical modeling * Summary Mavko: Stanford University 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations. - Develop technologies to demonstrate that 99% of injected CO 2 remains in injection zones. * Project benefits statement.

20

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Large Volume Injection of CO Large Volume Injection of CO 2 to Assess Commercial Scale Geological Sequestration in Saline Formations in the Big Sky Region Project Number: DE-FC26-05NT42587 Dr. Lee Spangler Big Sky Carbon Sequestration Partnership Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and Objectives * Project overview * Kevin Dome characteristics * Project design philosophy * Infrastructure * Modeling * Monitoring * Project Opportunities 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Research on Probabilistic and Research on Probabilistic Hydro-Thermo-Mechanical (HTM) Modeling of CO 2 Geological Sequestration (GS) in Fractured Porous Rocks Project DE-FE0002058 Marte Gutierrez, Ph.D. Colorado School of Mines U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program (Program goals addressed and Project benefits) * Project goals and objectives * Technical status - Project tasks * Technical status - Key findings * Lessons learned * Summary - Accomplishments to date 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

22

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Complexity and Choice of Complexity and Choice of Model Approaches for Practical Simulations of CO 2 Injection, Migration, Leakage, and Long- term Fate Karl W. Bandilla Princeton University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Project Number DE-FE0009563 2 Presentation Outline * Project Goals and Objectives * Project overview * Accomplishments * Summary 3 Benefit to the Program * The aim of the project is to develop criteria for the selection of the appropriate level of model complexity for CO 2 sequestration modeling at a given site. This will increase the confidence in modeling results, and reduce computational cost when appropriate.

23

RECIPIENT:WA Department of Commerce STATE: WA PROJECT Van Dyk Dairy Anaerobic Digester  

Broader source: Energy.gov (indexed) [DOE]

of5 of5 RECIPIENT:WA Department of Commerce STATE: WA PROJECT Van Dyk Dairy Anaerobic Digester TITLE: Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-EE0000139 GF0-10-604 Based on my review oftbe information concerning the proposed action, as NEPA CompUance Officer (authorized under DOE Order 451.1A), I have made the foUowing determination: cx, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution;

24

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS: CCS: Life Cycle Water Consumption for Carbon Capture and Storage Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Benefit to the Program * Program goals being addressed. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints

25

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Leakage Mitigation Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number: FE0004478 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background Information * Accomplishments to Date - Injection strategy development (control and prediction) - Large core tests - ambient pressure - Large core tests - high pressure - Small core tests - high pressure - MCDP, permeability and porosity assessments * Progress Assessment and Summary

26

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CO2 Leakage Mitigation CO2 Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number FE0004478 Lee H Spangler, Al Cunningham, Robin Gerlach Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation * Background information * Large core tests - ambient pressure * Large core tests - high pressure 3 Benefit to the Program Program goals being addressed. Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Project benefits statement. The Engineered Biomineralized Sealing Technologies

27

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS CCS Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program goals being addressed. - Increased control of reservoir pressure, reduced risk of CO2 migration, and expanded formation storage capacity. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints on CCS deployment and provide insight into

28

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Multiphase of Multiphase Flow for Improved Injectivity and Trapping 4000.4.641.251.002 Dustin Crandall, URS PI: Grant Bromhal, NETL ORD Morgantown, West Virginia U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program * Project overview * Breakdown of FY12 project tasks * Facilities and personnel * Task progress to date * Planned task successes * Tech transfer and summary 3 Benefit to the Program * Program goal being addressed - Develop technologies that will support industries' ability to predict CO

29

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Advanced Resources International, Inc. Advanced Resources International, Inc. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Program goal being addressed: - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Project benefits statement: - This research seeks to develop a set of robust mathematical modules to predict how coal and shale permeability and

30

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SUMNER SUMNER COUNTY, KANSAS Project Number DE-FE0006821 W. Lynn Watney Kansas Geological Survey Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Fountainview Wednesday 8-21-12 1:10-1:35 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Acknowledgements & Disclaimer Acknowledgements * The work supported by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) under Grant DE-FE0002056 and DE- FE0006821, W.L. Watney and Jason Rush, Joint PIs. Project is managed and

31

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0-22, 2013 0-22, 2013 Collaborators Zhengrong Wang, Yale University Kevin Johnson, University of Hawaii 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 storage capacity - Demonstrate fate of injected CO 2 and most common contaminants * Project benefits statement: This research project conducts modeling, laboratory studies, and pilot-scale research aimed at developing new technologies and new systems for utilization of basalt formations for long term subsurface storage of CO 2 . Findings from this project

32

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

behavior of shales as behavior of shales as seals and storage reservoirs for CO2 Project Number: Car Stor_FY131415 Daniel J. Soeder USDOE/NETL/ORD U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Project Overview: Goals and Objectives * Program Goals - Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness * Project Objectives - Assess how shales behave as caprocks in contact with CO 2 under a variety of conditions - Assess the viability of depleted gas shales to serve as storage reservoirs for sequestered CO

33

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CO CO 2 leakage and cap rock remediation DE-FE0001132 Runar Nygaard Missouri University of Science and Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the program * Project overview * Technical status * Accomplishments to date * Summary 2 3 Benefit to the Program * Program goals being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefits statement. - The project develops a coupled reservoir and geomechanical modeling approach to simulate cap rock leakage and simulate the success of remediation

34

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Web-based CO Web-based CO 2 Subsurface Modeling Geologic Sequestration Training and Research Project Number DE-FE0002069 Christopher Paolini San Diego State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and goals. * Web interface for simulating water-rock interaction. * Development of, and experience teaching, a new Carbon Capture and Sequestration course at San Diego State University. * Some noteworthy results of student research and training in CCS oriented geochemistry. * Status of active student geochemical and geomechancal modeling projects.

35

Project Title:  

Broader source: Energy.gov (indexed) [DOE]

Repair flowline 61-66-SX-3 Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY # 291 Project Information Date: 3/1 1/2010 Contractor Code: Project Overview In order to repair this line it was decided to trench a line aproximately 100 feet and tie it into the line at 71-3- 1. What are the environmental sx-3. This will get us out of the old flow line which has been repaired 5-6 times. this will mitigate the chances impacts? of having spills in the future. 2. What is the legal location? This flowline runs from the well77-s-1 0 to the B-2-10 manifold.+ "/-,~?X3 3. What is the duration of the project? Approximately 10 hours(1 day) to complete 4. What major equipment will be used backhoe and operator and one hand if any (work over rig. drilling rig.

36

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Co-Sequestration Co-Sequestration Studies Project Number 58159 Task 2 B. Peter McGrail Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 and mixed gas storage capacity in various geologic settings - Demonstrate fate of injected mixed gases * Project benefits statement:

37

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Model Complexity in Geological Carbon Model Complexity in Geological Carbon Sequestration: A Design of Experiment (DoE) & Response Surface (RS) Uncertainty Analysis Project Number: DE-FE-0009238 Mingkan Zhang 1 , Ye Zhang 1 , Peter Lichtner 2 1. Dept. of Geology & Geophysics, University of Wyoming, Laramie, Wyoming 2. OFM Research, Inc., Santa Fe, New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project major goals and benefits; * Detailed project objectives & success criteria; * Accomplishments to date; * Summary of results; * Appendix (organization chart; Gantt chart; additional results). Dept. of Geology & Geophysics, University of Wyoming

38

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Region Region DE-FE0001812 Brian J. McPherson University of Utah U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Acknowledgements * NETL * Shell * Tri-State * Trapper Mining * State of Colorado 3 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 4 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 5 Benefit to the Program Program Goals Being Addressed by this Project

39

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring Geological CO Monitoring Geological CO 2 Sequestration using Perfluorocarbon and Stable Isotope Tracers Project Number FEAA-045 Tommy J. Phelps and David R. Cole* Oak Ridge National Laboratory Phone: 865-574-7290 email: phelpstj@ornl.gov (*The Ohio State University) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Developing the Technologies and Building the Infrastructure for CO 2 Storage August 22, 2013 2 Project Overview: Goals and Objectives Goal: Develop methods to interrogate subsurface for improved CO 2 sequestration, field test characterization and MVA, demonstrate CO 2 remains in zone, and tech transfer. Objectives: 1. Assessment of injections in field. PFT gas tracers are analyzed by GC-ECD to

40

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Acknowledgments Dave Harris, Kentucky Geological Survey Dave Barnes, Western Michigan University John Rupp, Indiana Geological Survey Scott Marsteller, Schlumberger Carbon Services John McBride, Brigham Young University * Project is funded by the U.S. Department of Energy through the National Energy Technology Laboratory (NETL) and by a cost share agreement with the Illinois Department of Commerce and Economic Opportunity, Office of Coal Development through the Illinois Clean Coal Institute * ConocoPhillips: in-kind match * Western Kentucky Carbon Storage Foundation: matching funding * SeisRes 2020, Houston: VSP acquisition and processing

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to Analyze Spatial and Temporal to Analyze Spatial and Temporal Heterogeneities in Reservoir and Seal Petrology, Mineralogy, and Geochemistry: Implications for CO 2 Sequestration Prediction, Simulation, and Monitoring Project Number DE-FE0001852 Dr. Brenda B. Bowen Purdue University (now at the University of Utah) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction to the project * Tasks * Student training * Student research successes * Lessons learned and future plans 3 Benefit to the Program * Addresses Carbon Storage Program major goals: - Develop technologies that will support industries' ability to predict CO

42

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Results from Simulation Project Results from Simulation Framework for Regional Geologic CO 2 Storage Infrastructure along Arches Province of Midwest United States DOE Award No. DE-FE0001034 Ohio Dept. of Dev. Grant CDO/D-10-03 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting August 21-23, 2012 Joel Sminchak and Neeraj Gupta Battelle Energy Systems sminchak@battelle.org, 614-424-7392 gupta@battelle.org, 614-424-3820 BUSINESS SENSITIVE 2 Presentation Outline 1. Technical Status 2. Background (CO 2 Sources, Geologic Setting) 3. Injection Well history 4. Geocellular Model Development 5. Geological Data (Geological dataset, Geostatistics) 6. Geocellular porosity/permeability model development 7. Pipeline Routing Analysis

43

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SECARB Anthropogenic Test: SECARB Anthropogenic Test: CO 2 Capture/Transportation/Storage Project # DE-FC26-05NT42590 Jerry Hill, Southern Sates Energy Board Richard A. Esposito, Southern Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - CO 2 Capture - CO 2 Transportation - CO 2 Storage * Accomplishments to Date * Organization Chart * Gantt Chart * Bibliography * Summary Benefit to the Program 1. Predict storage capacities within +/- 30% * Conducted high resolution reservoir characterization of the Paluxy saline formation key

44

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Investigation of the CO Investigation of the CO 2 Sequestration in Depleted Shale Gas Formations Project Number DE-FE-0004731 Jennifer Wilcox, Tony Kovscek, Mark Zoback Stanford University, School of Earth Sciences U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Project Benefits * Technical Status * Imaging at mm- to micron-scales using CT - Permeability measurements and application of the Klinkenberg effect - Molecular Dynamics simulations for permeability and viscosity estimates * Accomplishments to Date * Summary Stanford University 3 Benefit to the Program * Carbon Storage Program major goals

45

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fidelity Computational Analysis of Fidelity Computational Analysis of CO2 Trappings at Pore-scales Project Number: DE-FE0002407 Vinod Kumar (vkumar@utep.edu) & Paul Delgado (pmdelgado2@utep.edu) University of Texas at El Paso U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Collaborators: Dr. C. Harris (Shell Oil Company/Imperial College), Dr. G. Bromhal (NETL), Dr. M. Ferer (WVU/NETL), Dr. D. Crandall (NETL-Ctr), and Dr. D. McIntyre (NETL). 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - Pore-network modeling - Conductance derivation for irregular geom. - Pore-to-CFD Computations

46

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Number (DE-FE0002056) W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary KANSAS STATE UNIVERSITY Bittersweet Energy Inc. Partners FE0002056 Devilbiss Coring Service Basic Energy Services Wellington Field Operator Industrial and Electrical Power Sources of CO 2 Southwest Kansas CO 2 -EOR Initiative Industry Partners (modeling 4 Chester/Morrowan oil fields to make CO2 ready) +drilling and seismic contractors TBN

47

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Number (DE-FE0002056) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 Brighton 1&2 2:40 August 20, 2013 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary ORGANIZATIONAL STRUCTURE Modeling CO 2 Sequestration in Saline A quifer and Depleted Oil Reservoir to Evaluate Regional CO 2 Sequestration Potential of Ozark Plateau A quifer System, South-Central Kansas Co-Principal Investigators Co-Principal Investigators Kerry D. Newell -- stratigraphy, geochemistry

48

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tracer for Tracking Permanent CO 2 Storage in Basaltic Rocks DE-FE0004847 Jennifer Hall Columbia University in the City of New York U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Conservative and Reactive Tracer Techniques * Accomplishments to Date * Summary 3 Benefit to the Program * The goal of the project is to develop and test novel geochemical tracer techniques for quantitative monitoring, verification and accounting of stored CO 2 . These techniques contribute to the Carbon Storage Program's

49

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Geotechnical Site and Geotechnical Site Investigations for the Design of a CO 2 Rich Flue Gas Direct Injection Facility Project Number DOE Grant FE0001833 Paul Metz Department of Mining & Geological Engineering University of Alaska Fairbanks U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix: Not Included in Presentation 3 Benefit to the Program * Carbon Storage Program Major Goals: - Develop technologies that will support industries' ability to

50

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Scale CO Scale CO 2 Injection and Optimization of Storage Capacity in the Southeastern United States Project Number: DE-FE0010554 George J. Koperna, Jr. Shawna Cyphers Advanced Resources International U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Program Goals * Benefits Statement * Project Overview - Goals - Objectives * Technical Status * Accomplishments to Date * Summary * Appendix USDOE/NETL Program Goals * Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop and validate technologies to ensure 99 percent storage permanence. * Develop technologies to improve reservoir storage

51

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SUMNER COUNTY, KANSAS DE-FE0006821 W. Lynn Watney, Jason Rush, Joint PIs Kansas Geological Survey The University of Kansas Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Brighton 1&2 Wednesday 8-21-13 1:10-1:35 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 2 Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Project Team DOE-NETL Contract #FE0006821 KANSAS STATE UNIVERSITY 3 L. Watney (Joint PI), J. Rush (Joint PI), J. Doveton, E. Holubnyak, M. Fazelalavi, R. Miller, D. Newell, J. Raney

52

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Seal Repair Using Seal Repair Using Nanocomposite Materials Project Number DE-FE0009562 John Stormont, Mahmoud Reda Taha University of New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Ed Matteo, Thomas Dewers Sandia National Laboratories 2 Presentation Outline * Introduction and overview * Materials synthesis * Materials testing and characterization * Annular seal system testing * Numerical simulation * Summary 3 Benefit to the Program * BENEFITS STATEMENT: The project involves the development and testing of polymer-cement nanocomposites for repairing flaws in annular wellbore seals. These materials will have superior characteristics compared to conventional

53

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wyoming: MVA Techniques for Determining Gas Transport and Caprock Integrity Project Number DE-FE0002112 PIs Drs. John Kaszuba and Kenneth Sims Virginia Marcon University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status - Results - Conclusions - Next Steps * Summary 3 Benefit to the Program * Program goal being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. - Monitoring, Verification, and Accounting (MVA). MVA technologies seek to monitor, verify, and

54

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Impact of CO Impact of CO 2 Injection on the Subsurface Microbial Community in an Illinois Basin CCS Reservoir: Integrated Student Training in Geoscience and Geomicrobiology Project Number (DEFE0002421) Dr. Yiran Dong Drs. Bruce W. Fouke, Robert A. Sanford, Stephen Marshak University of Illinois-Urbana Champaign U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Technical status * Results and discussion * Summary * Appendix 3 Benefit to the Program This research project has developed scientific, technical and institutional collaborations for the development of

55

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mohammad Piri and Felipe Pereira Mohammad Piri and Felipe Pereira University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 2013 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status o Experimentation: core-flooding and IFT/CA o Pore-scale modeling modeling * Accomplishments to Date * Summary University of Wyoming 3 Benefit to the Program * Program goal: o 'Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.' * Benefits statement: o The research project is focused on performing reservoir conditions experiments to measure steady-state relative permeabilities,

56

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MVA Tools MVA Tools Sam Clegg, Kristy Nowak-Lovato, Ron Martinez, Julianna Fessenden, Thom Rahn, & Lianjie Huang Los Alamos National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview - Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix - Organization Chart - Bibliography 3 Project Overview: Goals and Objectives * Surface MVA - Frequency Modulated Spectroscopy - Quantitatively identify CO2, H2S and CH4 seepage from geologic sequestration sites - Distinguish anthropogenic CO2 from natural CO2 emissions * CO2 carbon stable isotope measurements

57

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 BROWN 2 Presentation Outline * Benefits & overview of deriving acrylates from coupling carbon dioxide and ethylene * Chemical catalysis approach: background and battles left to fight * Experimental assessment of the viability of thermochemical acrylate production * Perspectives for the future BROWN 3 Benefit to the Program * This project identifies the critical catalyst features necessary to promote carbon dioxide coupling with ethylene to acrylate at molybdenum catalysts. This research demonstrates the viability of acrylate production

58

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 Proof-of-Feasibility of Using Wellbore Deformation as a Diagnostic Tool to Improve CO2 Sequestration DE FE0004542 Larry Murdoch, Clemson University Stephen Moysey, Clemson University Leonid Germanovich, Georgia Tech Cem Ozan, Baker Hughes Sihyun Kim, Georgia Tech Glenn Skawski, Clemson University Alex Hanna, Clemson University Johnathan Ebenhack, Clemson University Josh Smith, Clemson University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Proof-of-Feasibility of Using Wellbore Deformation as a Diagnostic Tool, Larry Murdoch Project Review Meeting, 23 Aug. 2013 2 Presentation Outline * Preliminaries

59

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DE-FE0001836: DE-FE0001836: Numerical modeling of geomechanical processes related to CO 2 injection within generic reservoirs Andreas Eckert & Runar Nygaard Missouri University of Science & Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Objectives, Benefits and Outcomes * Technical status: Project summary - Teaching - Reservoir scale (Geomechanics & Fluid flow simulation) - Borehole scale (Wellbore integrity & wellbore trajectory planning) * Conclusions * Appendix 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

60

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DE-FE0002225: DE-FE0002225: Actualistic and geochemical modeling of reservoir rock, CO 2 and formation fluid interaction, Citronelle oil field, Alabama West Virginia University & University of Alabama Presenter: Dr. Amy Weislogel (WVU) Co-PI: Dr. Rona Donahoe (UA) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits * Overview & Project Map * Reservoir Geochemical Characterization * Formation Fluid Geochemistry * Geochemical Modeling * Summary 3 Benefit to the Program * Develop technologies that will support industries'

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Investigating the Fundamental Investigating the Fundamental Scientific Issues Affecting the Long-term Geologic Storage of Carbon Dioxide Project Number DE-FE0000397 Lee H Spangler Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Computational tool development * Laboratory studies to understand subsurface CO 2 behavior * Analog studies to inform risk analysis * Near surface detection technologies / testing * Mitigation method development 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

62

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FE/NETL CTS Cost Models and FE/NETL CTS Cost Models and Benefits Assessment of Carbon Storage R&D Program David Morgan Benefits Division Office of Program Planning and Analysis National Energy Technology Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 OFFICE OF FOSSIL ENERGY 2 Presentation Outline * Overview of benefits assessment * Overview of FE/NETL models used to assess benefits of CO 2 capture and storage * Benefits evaluation of Storage Program's R&D projects using a model to estimate costs of CO 2 storage in a saline aquifer * Description of model used to estimate costs of

63

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline * Benefit to the program * Project overview: Why 14 C for MVA? * Technical status: Cartridges, injections, lasers * Summary * Organizational chart * Collaborators 3 Benefit to the Program * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Permanent storage of CO 2 can be demonstrated by adding carbon-14 ( 14 C) prior to injection. This research project aims to demonstrate this by tagging fossil CO 2 with 14 C at a field site. When completed, this system will show that 14 C can be a safe and effective tracer for sequestered CO 2 . A laser-based 14 C measurement method is being adapted for continuous monitoring. This technology contributes to the Carbon Storage Program's effort of ensuring 99 percent

64

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Leakage Pathways and Leakage Pathways and Mineralization within Caprocks for Geologic Storage of CO 2 Project DE-FC26-0xNT4 FE0001786 James P. Evans Utah State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits * Goals and Objectives * Relationship to overall program goals * Overview of seal bypass * Technical status; bypass systems - Field based studies - Technological advances * Accomplishments and Summary * Appendices 3 Benefit to the Program * Program goals addressed * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.

65

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Michael G. Waddell Earth Sciences and Resources Institute University of South Carolina U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 2 Presentation Outline * Project goals and benefits * Overview of the geology of the South Georgia Rift basin in SC * Results of petrographic and core analysis from the Rizer #1 * Future investigations in the SGR * Summary 3 Benefit to the Program Program Goals: * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected

66

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Micro-Structured Sapphire Fiber Sensors for Micro-Structured Sapphire Fiber Sensors for Simultaneous Measurements of High-T and Dynamic Gas Pressure in Harsh Environments DE-FE0001127 Investigators: Hai Xiao, Hai-Lung Tsai, Missouri University of Science and Technology Junhang Dong, University of Cincinnati Program Manager: Norm Popkie, Gasification Division, NETL DOE Project Kickoff Meeting in the NETL Pittsburgh December 15, 2009 Outline * Background * Objectives * Project Elements * Management Plan * Research Plan and Approaches * Risk Management * Summary Background * Demands: High-performance, reliable, in situ sensors are highly demanded for advanced process control and lifecycle management in existing and future advanced power and fuel systems - Improved efficiency/safety/reliability/availability/maintainability

67

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mart Oostrom Mart Oostrom Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline  Project overview  Sub-Task 1: Investigation of CO 2 migration in heterogeneous porous media  Sub-Task 2: Modeling CCUS deployment in China  Summary Collaboration with China on Clean Energy Research 3 Benefit to the Program The Clean Energy Partnership was established by a memorandum of understanding between the Chinese Academy of Sciences, the National Energy Technology Laboratory and the Pacific Northwest National Laboratory in May of 2009 with the goal of significantly reducing the environmental emissions and improving the efficiency of

68

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Evaluation of Evaluation of Geophysical Methods for Monitoring and Tracking CO 2 Migration in the Subsurface PI: Jeffrey Daniels Co-PI: Robert Burns & Franklin Schwartz Students: Michael Murphy & Kyle Shalek The Ohio State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 FOA Number: DE-FOA-0000032 NETL Award Number: DE-FE0002441 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 3 Benefit to the Program * Program Goal: Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones

69

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

capillary trapping (FE0004956), Bryant, UT-Austin capillary trapping (FE0004956), Bryant, UT-Austin Influence of Local Capillary Trapping on Containment System Effectiveness DE-FE0004956 Steven Bryant The University of Texas at Austin U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Local capillary trapping (FE0004956), Bryant, UT-Austin Local capillary trapping (FE0004956), Bryant, UT-Austin 2 Presentation Outline * Motivation and relevance to Program * Project goals * Technical status * Accomplishments * Summary * Future plans Local capillary trapping (FE0004956), Bryant, UT-Austin Local capillary trapping (FE0004956), Bryant, UT-Austin

70

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Brian Turk Research Triangle Institute U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and objectives * Carbon gasification * Carbon reactivity studies * Catalyst development * Techno-economic analysis * Summary 3 Benefit to the Program * Program goal: Reduce CO 2 emissions by developing beneficial uses that meet the DOE net cost metric of $10/MT for captured CO 2 that will mitigate CO 2 emissions in areas where geological storage may not be an optimal solution * Benefits statement: Development of a commercial process for converting CO 2 and a carbon source into a commodity chemical at a

71

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improved Caprock Integrity and Improved Caprock Integrity and Risk Assessment Techniques Project Number (FE0009168) Michael Bruno, PhD, PE GeoMechanics Technologies U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Introduction and Motivation 2 A primary requirement for long-term geologic storage and containment of carbon dioxide is ensuring caprock integrity. Large-scale CO2 injection requires improved and advanced simulation tools and risk assessment techniques to better predict and help control system failures, and to enhance performance of geologic storage. GeoMechanics Technologies is developing enhanced simulation and risk analysis approaches to assess and

72

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive Monitoring and Uncertainty Assessment of CO 2 Plume Migration DOE-FE0004962 Steven Bryant The University of Texas at Austin U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin 2 Presentation Outline * Motivation and relevance to Program * Project goals * Technical status * Accomplishments * Summary * Future plans Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin

73

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Basin-Scale Leakage Risks from Basin-Scale Leakage Risks from Geologic Carbon Sequestration: Impact on CCS Energy Market Competitiveness Catherine A. Peters Jeffery P. Fitts Michael A. Celia Princeton University Paul D. Kalb Vatsal Bhatt Brookhaven National Laboratory Elizabeth J. Wilson Jeffrey M. Bielicki Melisa Pollak University of Minnesota DOE Award DE-FE0000749 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to CCUS research program * Project Goals & Objectives * Technical Status  Thrust I - Reservoir-scale simulations of leakage potential with permeability evolution

74

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for Modeling CO for Modeling CO 2 Processes: Pressure Management, Basin-Scale Models, Model Comparison, and Stochastic Inversion ESD09-056 Jens T. Birkholzer with Abdullah Cihan, Marco Bianchi, Quanlin Zhou, Xiaoyi Liu, Sumit Mukhopadhyay, Dorothee Rebscher, Barbara Fialeix Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview and Technical Status - Task 1: Optimization of Brine Extraction for Pressure Management and Mitigation - Task 2: Basin-scale Simulation of CO 2 Storage in the Northern Plains - Prairie Basal Aquifer - Task 3: Sim-SEQ Model Comparison

75

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Beneficial Use of CO Beneficial Use of CO 2 in Precast Concrete Production DE-FE0004285 Yixin Shao, Yaodong Jia Liang Hu McGill University 3H Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation outline * Goals and objectives * Benefits to the program * Project overview * Technical status * Accomplishment to date * Summary 2 Objective Masonry blocks Fiber-cement panels Prefabricated buildings Concrete pipes To develop a carbonation process to replace steam curing in precast concrete production for energy reduction, and carbon storage and utilization. Goals * CO 2 sequestration capacity by cement:

76

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

University of Kansas Center for Research University of Kansas Center for Research Kansas Geological Survey U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 Presentation Outline * Benefits, objectives, overview * Methods * Background & setting * Technical status * Accomplishments * Summary Benefit to the Program * Program goal addressed: Develop technologies that will support the industries' ability to predict CO 2 storage capacity in geologic formations to within ± 30 percent. * Program goal addressed: This project will confirm - via a horizontal test boring - whether fracture attributes derived from 3-D seismic PSDM Volumetric Curvature (VC) processing are real. If

77

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Brian Turk Research Triangle Institute U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project benefits and objectives * Carbon reactivity studies * Catalyst mechanism studies * Catalyst development * Test results * Summary 3 Benefit to the Program * Program goal: Reduce CO 2 emissions by developing beneficial uses that meet the DOE net cost metric of $10/MT for captured CO 2 that will mitigate CO 2 emissions in areas where geological storage may not be an optimal solution * Benefits statement: Development of a commercial process for converting CO 2 and a carbon source into a commodity chemical at a

78

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0-22, 2013 0-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Advanced simulation tool for quantifying transport in porous and fractured geological formations during CO 2 sequestration that includes all mechanisms: convection, diffusion, dissolution and chemical reactions * A simulator that can fully model these processes does not currently exist * Simulator will contribute to our ability to predict CO 2 storage capacity in geologic formations, to within ±30 percent 4 Project Overview: Goals and Objectives Comprehensive reservoir simulator for investigation of CO 2 non-isothermal, multiphase flow and long-term storage in

79

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Thomas J. Wolery Thomas J. Wolery Lawrence Livermore National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 LLNL-PRES-574632 2 Team Members * Roger Aines * Bill Bourcier * Tom Wolery * Tom Buscheck * Tom Wolfe (consultant) * Mike DiFilippo (consultant) * Larry Lien (Membrane Development Specialists) 3 Presentation Outline * Overview of Active CO 2 Reservoir Management (ACRM) * Subsurface Reservoir Management: Made Possible by Brine Production, Yielding Many Benefits * Brine Disposal Options - What brines are out there? - What are the treatment options? 4 Benefit to the Program * This project is identifying and evaluating

80

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

William Bourcier William Bourcier Lawrence Livermore National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Saline Aquifer Brine Production Well Brine Injection Well Chiller Pretreatment Desalination Brine Permeate To power plant or other use Storage pump CO 2 injection Concept is to extract and desalinate aquifer brines to create fresh water and space for CO 2 storage cap-rock 3 Presentation Outline * Overview, Purpose, Goals and Benefits * Technical status - Brine treatment and disposition - Reservoir management * Accomplishments * Summary and Planned work Goals and Objectives Technical Goals Potential advantages of brine

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Metrics for Screening CO Metrics for Screening CO 2 Utilization Processes Peter Kabatek Energy Sector Planning and Analysis (ESPA) Services / WorleyParsons U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * NETL's Carbon Storage Program * Introduction of the metrics * Review of the case study technology * Application of metrics to the case study technology * Discussion of metrics interpretation and grouping 3 NETL Carbon Storage Program * The Carbon Storage Program contains three key elements: - Infrastructure - Global Collaborations - Core Research and Development: * Monitoring, Verification and Accounting (MVA) * Geologic Storage

82

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Reservoir Simulation Model * Intelligent Leakage Detection System (ILDS) * Accomplishments * Summary Objective * Develop an in-situ CO 2 leak detection technology based on the concept of Smart Fields. - Using real-time pressure data from permanent downhole gauges to estimate the location and the rate of CO 2 leakage. CO2 Leakage(X,Y,Q) Artificial Intelligence & Data Mining Industrial Advisory Committee (IAC) * Project goes through continuous peer-review by an Industrial Review Committee. * Meetings: - November 6 th 2009 : * Conference call * Site selection criteria - November 17 th 2009: * A meeting during the Regional Carbon Sequestration Partnership Meeting in Pittsburgh

83

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Factors Influencing Factors Influencing CO 2 Storage Capacity and Injectivity in Eastern Gas Shales Contract No. DE-FE0004633 Michael Godec, Vice President Advanced Resources International mgodec@adv-res.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Benefits * Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefits to the Program * Program Goals Addressed - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.

84

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Training and Research Peter M. Walsh University of Alabama at Birmingham U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CCUS Pittsburgh, Pennsylvania August 21-23, 2012 DE-FE0002224 * Evaluation of the sealing capacity of caprocks serving as barriers to upward migration of CO 2 sequestered in geologic formations. * Education and training of undergraduate and graduate students, through independent research on geologic sequestration. * Education, through an advanced undergraduate/graduate level course on coal combustion and gasification, climate change, and carbon sequestration. * Simulation of CO 2 migration and trapping in storage

85

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building the Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction - Objective - Industrial Review Committee - Background * Steps Involved - Geological and Reservoir Simulation Modeling - Leakage Modeling & Real-Time Data Processing - Pattern Recognition & Intelligent Leakage Detection System (ILDS) * Accomplishments to Date * Summary Objective * Develop an in-situ CO 2 leak detection technology based on the concept of Smart Fields. - Using real-time pressure data from permanent downhole gauges to estimate the location and the rate of CO 2 leakage. Industrial Advisory Committee (IAC) * Project goes through continuous peer-review by an Industrial Review Committee. * Meetings: - November 6 th 2009 :

86

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix Introduction * Most storage modeling studies assume a discrete reservoir/caprock interface with simple (uniform) flow conditions. * We address the question of whether or not heterogeneities at the interface influence transmission of CO 2 into the caprock 3 4 Reservoir Caprock Reservoir Introduction The nature of reservoir/caprock interfaces 4 Organization 5 Peter Mozley (PD/PI) NMT Sedimentology James Evans (Co-PI) USU Structure Thomas Dewers (Co-I) Jason Heath (Staff) SNL Modeling Mark Person (Cooperating Scientist) NMT Modeling Stefan Raduha NMT Sedimentology

87

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ketzin Collaboration Ketzin Collaboration ESD-09-056 Barry Freifeld Earth Sciences Division Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and objectives * Success Criteria * Technical Status * Latest developments in Integrated Monitoring * Summary and Lessons Learned 3 Image from: www.co2ketzin.de 4 Benefit to the Program * Program goal being addressed: - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * The Ketzin collaboration leverages information gained through the mid-scale geological sequestration experiment in Ketzin, Germany.

88

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Jennifer A. Kozak, Jennifer A. Kozak, 1,2 Dr. Fritz Simeon, 2 Prof. T. Alan Hatton,* ,2 and Prof. Timothy F. Jamison* ,1 1 Department of Chemistry and 2 Department of Chemical Engineering Massachusetts Institute of Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation, Goals, Objectives * Background * Cyclic Carbonate Synthesis via Catalytic Coupling of CO 2 and Epoxides * New Catalysts and Reaction Scope * Mechanism - A New Paradigm for Activating Epoxides * Conclusions 3 Benefit to the Program * Identify the Program goals being addressed. - Develop technologies to demonstrate that 99 percent

89

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Verification and Accounting of Geologic Carbon Sequestration Using a Field Ready 14 C Isotopic Analyzer DEFE 0001116 Bruno D.V. Marino PhD CEO, Founder Planetary Emissions Management, Inc. 485 Massachusetts Ave. Cambridge, MA 02139 bruno.marino@pem-carbon.com www.pem-carbon.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Benefits of a 14 CO 2 Field Analyzer to DOE MVA Program Goals Program Goals: 99% Containment Identify/Quantify CCS Credits Direct Tracking Verification Tight/Leaky Account for Natural Baseline MVA Atmosphere MVA Groundwater Ecosystem Health, Community Safety

90

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building the Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix Introduction * Most storage modeling studies involve a caprock/reservoir interface, and assume a discrete contact with simple (uniform) flow conditions. * We address the question of whether or not heterogeneities at the interface influence transmission of CO 2 into the caprock 3 Introduction The nature of reservoir/caprock interfaces 4 Triassic-Jurassic Strata, San Rafael Swell, UT Organization 5 Peter Mozley (PD/PI) NMT Sedimentology James Evans (Co-PI) USU Structure Thomas Dewers (Co-I) Jason Heath (Staff) SNL Modeling Mark Person

91

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Verification and Verification and Accounting of Geologic Carbon Sequestration Using a Field Ready 14 C Isotopic Analyzer CCS Public Outreach: Pathway to Tradable CCS Securities DEFE 0001116 Bruno D.V. Marino PhD CEO, Founder Planetary Emissions Management, Inc. One Broadway, 14 th Floor Cambridge, MA 02142 bruno.marino@pem-carbon.com www.pem-carbon.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 All RIGHTS RESERVED © Benefits: Public Outreach CCS-MVA LINKED TRADABLE SECURITY Increase Public Confidence in CCS Increase Public involvement in CCS "Leakage Rate" Product Distinct from GHG "Credits"

92

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Geologic Geologic Characterization of the Triassic Newark Basin of Southeastern New York and Northern New Jersey (DE-FE0002352) Daniel J. Collins, PG, RG Sandia Technologies, LLC U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 * Acknowledgment: This material is based upon work supported by the Department of Energy [National Energy Technology Laboratory] under Award Number DE- FE0002352, Contract No. 18131 from the New York State Energy Research & Development Authority [NYSERDA], and "In Kind" Cost Share from Schlumberger Carbon Services, Weatherford Laboratories, National Oilwell Varco, New York State Museum, and Rutgers University.

93

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RISK ASSESSMENT AND MONITORING OF RISK ASSESSMENT AND MONITORING OF STORED CO 2 IN ORGANIC ROCKS UNDER NON- EQUILIBRIUM CONDITIONS DOE (NETL) Award Number: DE-FE0002423 Investigator: Vivak (Vik) Malhotra DOE supported undergraduate student participants: Jacob Huffstutler, Ryan Belscamper, Stephen Hofer, Kyle Flannery,, Bradley Wilson, Jamie Pfister, Jeffrey Pieper, Joshua T. Thompson, Collier Scalzitti-Sanders, and Shaun Wolfe Southern Illinois University-Carbondale Carbondale, Illinois 62901-4401 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Carbon Storage Program * Program goals being addressed: - To attempt to answer whether CO

94

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Water-Rock Interactions Water-Rock Interactions and the Integrity of Hydrodynamic Seals FWP FE-10-001 Bill Carey Los Alamos National Laboratory Los Alamos, NM U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program Goal: Ensure retention of 99% of injected CO 2 * Focus: Wellbore integrity * Approach: Use field, experimental and computational methods - Determine long-term compatibility of wellbore materials with CO 2 - Determine leakage mechanisms - Predict well performance * Benefit: The research will provide a basis for evaluating the long-term performance of wells, guide remediation

95

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

© 2012 Paulsson, Inc. (PI) Development of a 1,000 Level 3C Fiber Optic Borehole Seismic Receiver Array Applied to Carbon Sequestration DE-FE0004522 Björn N.P. Paulsson Paulsson, Inc. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 ® © 2012 Paulsson, Inc. (PI) © 2012 Paulsson, Inc. (PI) * Goals: Design, build, and test a high performance borehole seismic receiver system to allow cost effective geologic Carbon Capture and Storage (CCS) * Objectives: A: Develop technology to allow deployment of a 1,000 level drill pipe deployed 3C Fiber Optic Geophone (FOG) receiver array for deep

96

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Space Geodesy and Geochemistry Space Geodesy and Geochemistry Applied to Monitoring and Verification of Carbon Capture and Storage Award # DE-FE0002184 Peter Swart University of Miami Tim Dixon University of South Florida U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * What is the Award For? * What Research Work is being Supported? * Geochemical Research What is the Award For? * Provides Support for the Training of Two Graduate Students - Student 1: Involved in analysis of SAR images - Student 2: Involved in modeling of sub-surface geochemistry and application of models for policy decisions

97

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

fluid-driven fracture fluid-driven fracture DE-FE0002020 Joseph F. Labuz Civil Engineering University of Minnesota U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits statement * Goal, objectives * Technical status: fracture code, experimental results (poro, AE) * Accomplishments * Summary 0 50 100 150 200 250 300 350 0.00 0.05 0.10 0.15 0.20 Lateral displacement [mm] Load [kN] 0 300 600 900 1200 1500 AE events inelastic deformation peak 3 Benefit to the Program * Goal: develop technologies to predict CO2 storage capacity in geologic formations. * Benefits statement: develop 3D boundary element code & experimental techniques

98

WA_00_030_ASE_AMERICAS_Request_to_Assign_Title_to_Waiver-Inv...  

Broader source: Energy.gov (indexed) [DOE]

WA1995019DONNELLYCORPORATIONWaiverofDomesticandFore.pdf WA1995018OPTICALCOATINGLABORATORYINCWaiverofDomesti.pdf WA03032RWESCHOTTSOLARINCWaiverof...

99

EIS-0397: Lyle Falls Fish Passage Project, WA  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's decision to modify funding to the existing Lyle Falls Fishway on the lower Klickitat River in Klickitat County, WA. The proposed project would help BPA meet its off-site mitigation responsibilities for anadromous fish affected by the development of the Federal Columbia River Power System and increase overall fish production in the Columbia Basin.

100

Project Title Project Sponsor (funding agency)  

E-Print Network [OSTI]

and procedures applicable to the above project; and we confirm that the PI is eligible to apply in accordance Project Title Project Sponsor (funding agency) Declaration of Principal Investigator (PI) I certify that: I agree that my participation in the project must be in accordance with all

Saskatchewan, University of

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Title Project Number  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Coupled HCTM Phenomena Coupled HCTM Phenomena From Pore-scale Processes to Macroscale Implications DE-FE0001826 J. Carlos Santamarina Georgia Institute of Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline Project Overview: The Proposal Accomplishments: HTCM Coupled Processes Appendices: Contact Information Schedule Bibliography Presentation Outline Project Overview: The Proposal Accomplishments: HTCM Coupled Processes Appendices: Contact Information Schedule Bibliography Relevance "Faustian bargain"? long-term CO 2 geo-storage needed (C-economy + climate change)

102

Title Project Number  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project DE-FE0001808 Novel Oxygen Carriers For Coal-Fueled Chemical Looping Combustion Western Kentucky University Presenter: Dr. Yan Cao Institute for Combustion Science and Environmental Technology February 25, 2011 Project Participants * PIs: Dr. Wei-Ping Pan Dr. Yan Cao * Students: Ms. Wen Ying (Master student) Mr. Andy Wang (Undergraduate student) Mr. Yanwen Cui (Master student) Introduction (limit - 1 slide) * Background on the project * Anticipated benefits Solid Oxygen Carriers 1. Commercially accepted kinetics - coupling and potential uncoupling (free oxygen) 2. Thermal Stability, Lower degradation, and Lower Attrition loss 3. Favored thermodynamics for pure CO 2 4. Opportunity to release of free oxygen for improvement of process kinetics;

103

Header with Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5NT42646 Zero Emissions Coal Syngas-Oxygen Turbo Machinery 5NT42646 Zero Emissions Coal Syngas-Oxygen Turbo Machinery FACT SHEET (42646) Oct. 2006 I. PROJECT PARTICIPANTS A. Siemens Power Generation, Inc. B. Florida Turbine Technologies, Inc. C. Clean Energy Systems, Inc. II. PROJECT DESCRIPTION A. Objective(s) - To develop a cost effective and highly efficient turbo machinery system that will work with an oxy-fuel combustor that generates very high temperature CO2 and steam mixture as the working fluid. After expansion of the working fluid, the CO2 is captured allowing near-zero emissions of NOx and carbon. The project will complete conceptual designs of alternate steam cycles and select one cycle for detailed design based on cost and feasibility studies. B. Relevancy - 1. Background: CES, Inc. has an operational oxy-fuel combustor that generates

104

Header with Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

42648 - Micro-Mixing Lean Premix Systems for Ultra-Low Emission 42648 - Micro-Mixing Lean Premix Systems for Ultra-Low Emission Hydrogen/Syngas Combustion 12/15/2006 FACT SHEET I. PROJECT PARTICIPANTS Parker Hannifin Corporation (Lead) Gas Turbine Fuel Systems Division, 9200 Tyler Blvd., Mentor OH 44060 PI: Dr. Adel Mansour (e-mail: amansour@parker.com, Ph.: 440-954-8171) University of California at Irvine UCI Combustion Laboratory, Irvine, CA 92617 Solar Turbines Incorporated 2200 Pacific Highway, San Diego CA 92101 II. PROJECT DESCRIPTION A. Objective(s) The overall objective of this DOE-Supported research and development program is to develop and test a next-generation, practical and scalable, high-performing, multi-point injector module for hydrogen and syngas fuels. The injector will use Parker Hannifin's

105

Header with Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Shock Wave Compression rev060908, 6/14/06, rev 9/8/06 Shock Wave Compression rev060908, 6/14/06, rev 9/8/06 FACT SHEET Rampressor Shock Wave Compressor , DE-FC26-06NT42651 (Ramgen Power Systems, RPS) I. PROJECT PARTICIPANTS A. Prime Participant: Ramgen Power Systems, Inc (RPS) under cooperative Agreement DE-FC26-06NT42651 B. Sub-Award Participants: ASE Technologies (ASE), Manufacturing Resources Inc. (MRI), Geminus Technologies Development (GTD), Steve Kushnick, P.E., Alouette Technology. II. PROJECT DESCRIPTION A. Objective(s): Based on aerospace ramjet technology, Ramgen Power Systems is developing a novel more cost effective compressor concepts (air and carbon dioxide) for support of coal fueled gasification stationary power applications and for potential replacement of the compressor component in gas turbines.

106

Title Project Number  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Research 2011 Yearly Review Meeting Project DE-FE0002128 Analysis of microbial activity under a supercritical CO 2 atmosphere Massachusetts Institute of Technology Prof. Janelle Thompson, Department of Civil and Environmental Engineering February 24-26, 2011 Project Participants * Dr. Janelle Thompson, PhD, Assistant Professor, Civil and Environmental Engineering (MIT) * Dr. Hector Hernandez, PhD, Martin Luther King Postdoctoral Fellow (MIT) * Mr. Kyle Peet, doctoral student, Civil and Environmental Engineering, MIT * 2 undergraduates Janelle Hector Kyle 3 Why do microbes matter? CO 2 "trapping" mechanisms -biofilm barriers -mineralization Natural and Engineered Systems Mitchell et al, 2009 dawsonite Biofilm Barriers Biological catalysis of mineral trapping Can we recover life forms that grow in supercritical CO

107

Project Title: VIscosity Reduction Date:  

Broader source: Energy.gov (indexed) [DOE]

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

108

EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project  

Broader source: Energy.gov (indexed) [DOE]

73: W.A. Parish Post-Combustion CO2 Capture and Sequestration 73: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX SUMMARY This EIS evaluates the environmental impacts of a proposal to provide financial assistance for a project proposed by NRG Energy, Inc (NRG). DOE selected NRG's proposed W.A. Parish Post-Combustion CO2 Capture and Sequestration Project for a financial assistance award through a competitive process under the Clean Coal Power Initiative Program. NRG would design, construct and operate a commercial-scale carbon dioxide (CO2) capture facility at its existing W.A. Parish Generating Station in Fort Bend County, Texas; deliver the CO2 via a new pipeline to the existing West Ranch oil field in Jackson

109

EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project  

Broader source: Energy.gov (indexed) [DOE]

EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX SUMMARY This EIS evaluates the environmental impacts of a proposal to provide financial assistance for a project proposed by NRG Energy, Inc (NRG). DOE selected NRG's proposed W.A. Parish Post-Combustion CO2 Capture and Sequestration Project for a financial assistance award through a competitive process under the Clean Coal Power Initiative Program. NRG would design, construct and operate a commercial-scale carbon dioxide (CO2) capture facility at its existing W.A. Parish Generating Station in Fort Bend County, Texas; deliver the CO2 via a new pipeline to the existing West Ranch oil field in Jackson

110

Sustainability Project Fund Application Form Requirements Project Title  

E-Print Network [OSTI]

Sustainability Project Fund Application Form Requirements Project Title: Budget Requested: Applicant/Project Leader: Faculty/Department: Email: Daytime Phone: Project Team: (Please include. Project Overview Project summary: · Provide a brief background, describing the project, objectives

Volesky, Bohumil

111

EA-1949: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA | Department  

Broader source: Energy.gov (indexed) [DOE]

49: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA 49: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA EA-1949: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA SUMMARY This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within Island County, Washington. The Federal Energy Regulatory Commission (FERC) is the lead agency. DOE is a cooperating agency. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 9, 2013 EA-1949: FERC Notice of Availability Errata Sheet

112

W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Final Environmental Impact Statement (DOE/EIS-0473)  

Broader source: Energy.gov (indexed) [DOE]

W.A. W.A. Parish Post-Combustion CO 2 Capture and Sequestration Project Final Environmental Impact Statement Summary February 2013 DOE/EIS-0473 Office of Fossil Energy National Energy Technology Laboratory INTENTIONALLY LEFT BLANK COVER SHEET Responsible Federal Agency: U.S. Department of Energy (DOE) Title: W.A. Parish Post-Combustion CO 2 Capture and Sequestration Project, Final Environmental Impact Statement (DOE/EIS-0473) Location: Southeastern Texas, including Fort Bend, Wharton, and Jackson counties Contacts: For further information about this Environmental Impact Statement, contact: For general information on the DOE process for implementing the National Environmental Policy Act, contact: Mark W. Lusk U.S. Department of Energy National Energy Technology Laboratory 3610 Collins Ferry Road Morgantown, WV 26507-0880 (304) 285-4145 or Mark.Lusk@netl.doe.gov

113

EIS-0325: Schultz-Hanford Area Transmission Line Project, WA  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

114

EA-1855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties, WA |  

Broader source: Energy.gov (indexed) [DOE]

855: Creston-Bell Rebuild Project, Spokane and Lincoln 855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties, WA EA-1855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties, WA Summary This EA (also known as DOE/EA-4406 or DOE/BP-4406) evaluates the potential environmental impacts from rebuilding the Creston-Bell No. 1 115-kV transmission line, including the replacement of wood poles and associated structural components and conductor and access road improvements. The 54-mile long, wood pole line extends from the Bonneville Power Administration (BPA) Creston substation to the BPA Bell substation near Spokane in Lincoln and Spokane Counties, Washington. Additional information about this project is available on the BPA website. Public Comment Opportunities None available at this time. Documents Available for Download

115

EA-1949: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA  

Broader source: Energy.gov [DOE]

This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within Island County, Washington. The Federal Energy Regulatory Commission (FERC) is the lead agency. DOE is a cooperating agency.

116

WA_07_038_POET_PROJECT_LIBERTY_LLC_Waiver_of_Domestic_and_Fo...  

Broader source: Energy.gov (indexed) [DOE]

7038POETPROJECTLIBERTYLLCWaiverofDomesticandFo.pdf WA07038POETPROJECTLIBERTYLLCWaiverofDomesticandFo.pdf WA07038POETPROJECTLIBERTYLLCWaiverofDomestic...

117

Project Information Form Project Title Modeling for Local Impact Analysis  

E-Print Network [OSTI]

Project Information Form Project Title Modeling for Local Impact Analysis University University Research and Educational Foundation- $48,683.00 Total Project Cost $48,683.00 Agency ID or Contract Number Project We will develop a traffic simulation model for the Los Angeles region that will allow us

California at Davis, University of

118

Proposed Start Date: Title of Project  

E-Print Network [OSTI]

Proposed Start Date: Title of Project: 1 Department:Principal Investigator(s): 1. College: Phone/ Email: 5 6 7 8 Does project involve: Human subjects? No Yes VertebrateAnimals? No Yes Radioactive understand and agree to comply with the URI policies and procedures for misconduct, conflict of interest

Rhode Island, University of

119

Critical in PROJECT TITLE COMMENTS BPA NPCC  

E-Print Network [OSTI]

PROJECT NUMBER (BiOp Critical in Italics) PROJECT TITLE COMMENTS BPA NPCC 35019 Develop and Implement a Pilot Status and Trend Monitoring Program BPA reduced budget by $250,000 to reflect duplicate NPCC tier 2. NPCC budget reflects an assumption of a capital determination for some components; BPA has

120

Project Title: Thematic Analysis of Forensic  

E-Print Network [OSTI]

Project Title: Thematic Analysis of Forensic Service Whanau/family Booklet Bachelor of Arts Application Deadline: 13 February, Noon Project Description: The Canterbury Regional Forensic Service (http' and their families' journey through the Forensic Service. The data has already been transcribed but needs in

Hickman, Mark

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Project Title: Thematic Analysis of Forensic  

E-Print Network [OSTI]

Project Title: Thematic Analysis of Forensic Service Whanau/family Booklet Bachelor of Arts Application Deadline: 1 February, 2012 Project Description: The Canterbury Regional Forensic Service (http' and their families' journey through the Forensic Service. The data has already been transcribed but needs in

Hickman, Mark

122

Project Information Form Project Title Eco-Driving for Transit  

E-Print Network [OSTI]

Provided (by each agency or organization) DOT - $54,871.35 Total Project Cost $54,871.35 Agency IDProject Information Form Project Title Eco-Driving for Transit University Georgia Institute Project Second-by-second data for school buses, MARTA transit buses, and GRTA express buses

California at Davis, University of

123

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Broader source: Energy.gov (indexed) [DOE]

New power Line for new generator at ten sleep New power Line for new generator at ten sleep Dat e: 12114/10 DOE Code: Contractor Code: Project Lead: Mike Preston Project Overview 1. Brief project description (include Extend 3 phase power line from (existing) pole 99 to the Ten Sleep location for a new generator. The anything that could impact the transformer bank at the WDF will be dismantled, the line extended overhead, across 5 new power poles, to environment) the Ten Sleep Battery and the bank will be reassembled there. The new guy anchor at pole 99 will be located outside Palustrine wetlands. The line will be 34.5/19.920 KV, approximately 1,200 feet in length. 2. Legal location Ground disturbance will be minimal and have very little potential to affect the environment. 3. Duration of the project

124

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Broader source: Energy.gov (indexed) [DOE]

Dig d~ch from 24-51-5TX-1 0 to 24-AX-10 and reinstall electrical wire Dig d~ch from 24-51-5TX-1 0 to 24-AX-10 and reinstall electrical wire Date: 12120/2010 DOE Coda: Contractor Coda: Project Lead: Marcus Bruckner Project Overview 1 Dig ditch from 24-51-8TX-1 0 to 24-AX-10 and remove and replace electrical wire {N 2.7o') 1. Brief project desalptlon Pnclude anything that oould impact the 2. 24-51-5TX-10 and 24-AX-10 (SW r.tN 10TOWNSHIP 38 NORTH RANGE 78WEST) environment] 2. Leg allocation 3. 1 day 3. Duration of the project 4. Major equipment to be used 4. Backhoe The table below is to be completed by the Project Leed and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and contact the Technical Assurance Department.

125

Project title: Principal Investigator(s)  

E-Print Network [OSTI]

No. 0123 Project title: Principal Investigator(s): Funding Agency: Submission deadline: Instruments, redeployment costs) OBS engineering and technical support cost: (on shore and at sea) Shipping: Travel and technical support for OBS operations at sea. The cost of providing this support (e.g., instrument charges

Menke, William

126

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Broader source: Energy.gov (indexed) [DOE]

Reclamation of Pits and Boxes Reclamation of Pits and Boxes Date: Nov. 11 , 2010 DOE Code: 6740.010.00000 Contractor Code: 8067-451 Project Lead: Anthony Bowler Project Overview 1. Brief project description [include anything that Reclamation of Q!!]y the following Pits and Boxes : 1. T-2-11 could impact the environment) 2. B-1-10 Pit 2. Legal location 3. B-1-3 Pit 3. Duration of the project 4. T .Q-3 Concrete Sump Box 4. Major equipment to be used 5. B-2-10 Skim Box 6. B-1-14 Skim Box 7. 66-1-StX-14 Pit 8. T-5-10 Pit 9. WDFSkim Box 10. WDFUpperPit 11 . WDFLowerPit 12. B-1-3 Skim Box 13. T-3-3 Skim Box 14. T-1-20 Pit 15. T-2-34 Pit (A) 16. T-2-34 Pit (B) 17. B-1 -10 Skim Box 18. Carwash Skim Box 19. 5~1-SX-3-Madison Water Valve Box from 57-WX-3 20. T-5-3 Pit

127

NEPA COMPLIANCE SURVEY J.-1{p Project Information Project Title:  

Broader source: Energy.gov (indexed) [DOE]

}:- }:- J.-1{p Project Information Project Title: Flowline leak @ 68-66-SX-34 Date: 1/26/2010 DOE Code: Contractor Code: Project Lead: Jeff Jones Project Overview 011..- 1. What are the environmental Elimination of the flowline@ 68-66- SX-34. Dig up and locate leak. Take p ntaminated soil to land fann and impacts? record in log book. The duration of this project will be approx. 4-days. The equipment to be used is as follows backhoe, and welder. We will be eliminating the flowline and pumping to a tank set on location.So we don't 2. What is the legal location? have any leaks in the Mure. 3. What is the duration of the project? 4. What major equipment will be used if any (work over rig, drilling rig, etc.)? The table below Is to be completed by the Project Lead and nwlewed by the Environmental Specialist and the DOE NEPA

128

BEACON SOLAR ENERGY PROJECT (08-AFC-2) Project Title: Beacon Solar Energy Project (Beacon)  

E-Print Network [OSTI]

BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Project Title: Beacon Solar Energy Project and operate the Beacon Solar Energy Project (Beacon). Location: The project is located in eastern Kern County;BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Licensing: The Beacon project would have a nominal

129

Geothermal: Sponsored by OSTI -- Project Title: Small Scale Electrical...  

Office of Scientific and Technical Information (OSTI)

Project Title: Small Scale Electrical Power Generation from Heat Co-Produced in Geothermal Fluids: Mining Operation Geothermal Technologies Legacy Collection HelpFAQ | Site Map |...

130

Project Project Funding Operational & Maintenance Costs Univ. Project Title GSF Brief Description of Project Location Amount Source  

E-Print Network [OSTI]

Project Project Funding Operational & Maintenance Costs Univ. Project Title GSF Brief Description of Project Location Amount Source UF Minor Projects for UF 50,000 Minor projects for facilities located and education. Typical projects consist of Gainesville/ Typical projects other funding greenhouses, general

Slatton, Clint

131

Independence) PROJECT TITLE: Clinton Community Human Service Campus Project  

Broader source: Energy.gov (indexed) [DOE]

Area Substance Abuse Council, Inc (a SEP subrecipient of the Iowa Office of Energy STATE: IA Area Substance Abuse Council, Inc (a SEP subrecipient of the Iowa Office of Energy STATE: IA Independence) PROJECT TITLE: Clinton Community Human Service Campus Project Page 1 of2 Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE FOA 000052 EE0000162 GFO-0000162-015 EE162 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

132

Project Information Form Project Title Urban Spatial Structure and GHG Emissions  

E-Print Network [OSTI]

Project Information Form Project Title Urban Spatial Structure and GHG Emissions University UC specified GHG reduction targets. This requires clear evidence that links from urban spatial structure

California at Davis, University of

133

Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project -Compliance  

E-Print Network [OSTI]

DOCKETED Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project - Compliance TN schedule and procedures necessary to conclude the amendment review process. At the Prehearing Conference

134

Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project -Compliance  

E-Print Network [OSTI]

DOCKETED Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project - Compliance TN-700-2009-004.PDF #12;2 Notice of Committee's Intention to Use Informal Hearing Procedures Pursuant

135

Project ID: 35011 Title: The Floating Net Pen Transportation System Pilot Project  

E-Print Network [OSTI]

Project ID: 35011 Title: The Floating Net Pen Transportation System Pilot Project Sponsor: Columbia. Principal goals are to assess survival and straying at adulthood. Net pens are proposed as a low cost

136

Project Information Form Project Title Assessment of Critical Barriers to Alternative and Renewable Fuel and  

E-Print Network [OSTI]

Project Information Form Project Title Assessment of Critical Barriers to Alternative and Renewable Fuel and Vehicle Deployment University UC Davis Principal Investigator Amy Jaffe Andrew Burke PI models are necessary to promote adequate investment in promising alternative vehicle technologies

California at Davis, University of

137

Project Information Form Project Title Integrating Management of Truck and Rail Systems in Los Angeles  

E-Print Network [OSTI]

Project Information Form Project Title Integrating Management of Truck and Rail Systems in Los or organization) Volvo Research and Educational Foundation- $79,604.00 Total Project Cost $79,604.00 Agency ID of Research Project This project will develop models to optimize the balance of freight demand across rail

California at Davis, University of

138

Project Information Form Project Title Spatial Dynamics of the Logistics Industry and Implications for Freight  

E-Print Network [OSTI]

or organization) Caltrans $50,000 Total Project Cost $50,000 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title Spatial Dynamics of the Logistics Industry and Implications and End Dates August 15, 2014 to August 14 2015 Brief Description of Research Project This project

California at Davis, University of

139

Name Title of Project Site Supervisor and  

E-Print Network [OSTI]

in Yolo County's Department of Public Health Hoa Tan, Program Director, Emergency Preparedness, Yolo Community Health Assessment Project Jill Cook, MS, RN, PHN, Director of Health, Yolo County Health Department 500 Jefferson Blvd. West Sacramento, CA 95691 (916) 375-6380 jill.cook@yolo county.org BK Yoo, MD

Leistikow, Bruce N.

140

Project Information Form Project Title White Paper on Climate Adaptation for State DOTs and Local Agencies  

E-Print Network [OSTI]

Project Information Form Project Title White Paper on Climate Adaptation for State DOTs and Local each agency or organization) DOT $30,000 Total Project Cost $30,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates January 2014 to December 2014 Brief Description of Research Project

California at Davis, University of

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Project Information Form Project Title White Paper on The application of permeable pavement with emphasis  

E-Print Network [OSTI]

Project Information Form Project Title White Paper on The application of permeable pavement (by each agency or organization) Cal Trans Total Project Cost $29,007 Agency ID or Contract Number Project Depending on the type of surface pavement, permeable pavement can be termed as porous asphalt

California at Davis, University of

142

Project Title Improved Emission Models for Project Evaluation (MOVES-Matrix) University Georgia Institute of Technology  

E-Print Network [OSTI]

Project Title Improved Emission Models for Project Evaluation (MOVES-Matrix) University Georgia or organization) DOT - $92,292.15 Total Project Cost $92,292.15 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates November 2013 - June 2015 Brief Description of Research Project Local governments are using

California at Davis, University of

143

Project Information Form Project Title Reduction of Lifecycle Green House Gas Emissions From Road  

E-Print Network [OSTI]

Project Information Form Project Title Reduction of Lifecycle Green House Gas Emissions From Road@ucdavis.edu Funding Source(s) and Amounts Provided (by each agency or organization) US DOT $30,000 Total Project Cost Brief Description of Research Project This white paper will summarize the state of knowledge and state

California at Davis, University of

144

Project Information Form Project Title Impact of Legislative Mandates on Transportation Workforce Capacity  

E-Print Network [OSTI]

or organization) DOT $95,000 Total Project Cost $95,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and EndProject Information Form Project Title Impact of Legislative Mandates on Transportation Workforce Dates August 1, 2014 to July 31, 2015 Brief Description of Research Project The transportation industry

California at Davis, University of

145

Project Information Form Project Title Accelerating Commercialization of Alternative and Renewable Fuels and  

E-Print Network [OSTI]

or organization) CEC $344,546 Total Project Cost $344,546 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title Accelerating Commercialization of Alternative and Renewable and End Dates June 30, 2014 to June 30, 2016 Brief Description of Research Project Alternative

California at Davis, University of

146

Project Information Form Project Title Exploring Unintended Environmental and SocialEquity Consequences of  

E-Print Network [OSTI]

Source(s) and Amounts Provided (by each agency or organization) Caltrans $91,829 Total Project Cost $92Project Information Form Project Title Exploring Unintended Environmental and Social Brief Description of Research Project Communities throughout the U.S. are pursuing land use

California at Davis, University of

147

Project Information Form Project Title Using Connected Vehicle Technology for Advanced Signal Control  

E-Print Network [OSTI]

,387 Total Project Cost $59,387 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates 4/14/2014 ­ 9Project Information Form Project Title Using Connected Vehicle Technology for Advanced Signal/30/15 Brief Description of Research Project Today's conventional traffic control strategies typically rely

California at Davis, University of

148

Project Information Form Project Title Designing and Analyzing Policies for Renewable Fuels  

E-Print Network [OSTI]

or organization) US DOT $38,942 Total Project Cost $38,942 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title Designing and Analyzing Policies for Renewable Fuels and End Dates September 1, 2014 to August 31, 2015 Brief Description of Research Project Federal and state

California at Davis, University of

149

Project Information Form Project Title Designing and Analyzing Policies for Renewable Fuels  

E-Print Network [OSTI]

or organization) US DOT $38,925 Total Project Cost $38,925 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title Designing and Analyzing Policies for Renewable Fuels and End Dates September 1, 2014 to August 31, 2015 Brief Description of Research Project Federal and state

California at Davis, University of

150

Project Information Form Project Title The Role of Environmental Concerns, Lifestyles, Mobility-Related  

E-Print Network [OSTI]

(s) and Amounts Provided (by each agency or organization) Cal Trans $92,070.27 Total Project Cost $92Project Information Form Project Title The Role of Environmental Concerns, Lifestyles, Mobility Brief Description of Research Project Recent research has highlighted significant modifications

California at Davis, University of

151

Project Information Form Project Title White Paper on Performance Based Approaches to Incentivize Local Adoption of  

E-Print Network [OSTI]

Provided (by each agency or organization) Caltrans $23,385 Total Project Cost $23,385 Agency ID or ContractProject Information Form Project Title White Paper on Performance Based Approaches to Incentivize of Research Project This white paper will consider how to incentivize local government adoption of land use

California at Davis, University of

152

Project Information Form Project Title Intercity Travel in Northeaster Non-metropolitan Regions: What Roles do  

E-Print Network [OSTI]

) USDOT $73,000 Total Project Cost $73,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and End DatesProject Information Form Project Title Intercity Travel in Northeaster Non-metropolitan Regions September 2014 to August 2016 Brief Description of Research Project Little is known about intercity travel

California at Davis, University of

153

Project Information Form Project Title Innovative Data Collection to Improve Transit Service Assessment  

E-Print Network [OSTI]

(s) and Amounts Provided (by each agency or organization) DOT - $102,971.57 Total Project Cost $102,971.57 AgencyProject Information Form Project Title Innovative Data Collection to Improve Transit Service of Research Project Mobile information technology will be used to compare travel behavior of populations

California at Davis, University of

154

Project Information Form Project Title Eco-Driving to Reduce Emissions Cars (Behavioral Focus)  

E-Print Network [OSTI]

Source(s) and Amounts Provided (by each agency or organization) USDOT $34,618.33 Total Project Cost $34Project Information Form Project Title Eco-Driving to Reduce Emissions ­ Cars (Behavioral Focus Description of Research Project The purpose of this review is to provide energy and environment policy makers

California at Davis, University of

155

Project Information Form Project Title Intercity Travel in Northeastern Non-metropolitan Regions: What Roles do  

E-Print Network [OSTI]

) USDOT $73,000 Total Project Cost $73,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and End DatesProject Information Form Project Title Intercity Travel in Northeastern Non-metropolitan Regions September 2014 to August 2016 Brief Description of Research Project Little is known about intercity travel

California at Davis, University of

156

Project Information Form Project Title Working toward a policy framework for reducing greenhouse gas  

E-Print Network [OSTI]

Provided (by each agency or organization) US DOT $37,874 Total Project Cost $37,874 Agency ID or ContractProject Information Form Project Title Working toward a policy framework for reducing greenhouse of Research Project This white paper is concerned with a preliminary investigation of the extent to which

California at Davis, University of

157

Project Information Form Project Title Advanced Energy Management Strategy Development for Plug-in Hybrid  

E-Print Network [OSTI]

,365 Total Project Cost $58,365 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates April 1, 2014Project Information Form Project Title Advanced Energy Management Strategy Development for Plug ­ September 30, 2015 Brief Description of Research Project Plug-in hybrid vehicles (PHEVs) have great

California at Davis, University of

158

Project Information Form Project Title White Paper of Assessing Transportation Financing Options from a Green  

E-Print Network [OSTI]

or organization) US DOT $23,700 Total Project Cost $23,700 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title White Paper of Assessing Transportation Financing Options and End Dates June 15, 2014 to August 31, 2014 Brief Description of Research Project The Highway Trust

California at Davis, University of

159

Project Information Form Project Title Program for Vehicle Regulatory Reform: Assessing Life Cycle-Based  

E-Print Network [OSTI]

,931.44 Total Project Cost $98,931.44 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates November 1Project Information Form Project Title Program for Vehicle Regulatory Reform: Assessing Life Cycle, 2014 ­ October 31, 2015 Brief Description of Research Project Current greenhouse gas emissions

California at Davis, University of

160

Project Information Form Project Title Managing Roadway Systems to Reduce GHG Emissions and Improve  

E-Print Network [OSTI]

or organization) $25,217 Total Project Cost $25,217 Agency ID or Contract Number DTRT13-G-UTC29 Start and EndProject Information Form Project Title Managing Roadway Systems to Reduce GHG Emissions and Improve Dates 4/1/14 ­ 3/30/15 Brief Description of Research Project There have been a variety of traffic

California at Davis, University of

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Project Information Form Project Title Reducing Truck Emissions and Improving Truck Fuel Economy via ITS  

E-Print Network [OSTI]

each agency or organization) US DOT $90,000 Total Project Cost $90,000 Agency ID or Contract NumberProject Information Form Project Title Reducing Truck Emissions and Improving Truck Fuel Economy Project Currently trucks are viewed as any other vehicle in traffic management Currently trucks are viewed

California at Davis, University of

162

Project Information Form Project Title Urban Spatial Structure and GHG Emissions  

E-Print Network [OSTI]

Source(s) and Amounts Provided (by each agency or organization) Caltrans $79,375 Total Project Cost $79Project Information Form Project Title Urban Spatial Structure and GHG Emissions University USC Brief Description of Research Project The evidence on land use and travel shows that employment access

California at Davis, University of

163

W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Final Environmental Impact Statement (DOE/EIS-0473)  

Broader source: Energy.gov (indexed) [DOE]

NRG W.A. PARISH PCCS PROJECT NRG W.A. PARISH PCCS PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT APPENDIX H. BEG MODELING REPORT APPENDIX H BEG MODELING REPORT DOE/EIS-0473 NRG W.A. PARISH PCCS PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT APPENDIX H. BEG MODELING REPORT INTENTIONALLY LEFT BLANK 1 Reservoir modeling and simulation for estimating migration extents of injectate-CO 2 in support of West Ranch oilfield NEPA/EIS Gulf Coast Carbon Center, Bureau of Economic Geology, Jackson School of Geosciences, The University of Texas at Austin May 4, 2012 Summary It is anticipated that anthropogenic carbon dioxide (CO2-A) will be injected into the deep (5,000-6,000 ft below sea level) subsurface for enhanced oil recovery (EOR) at the West Ranch oilfield beginning in early 2015. The purpose of this report is to present reservoir modeling and simulation

164

Project Title and Principal Investigators FY 2014 Federal  

E-Print Network [OSTI]

Sea Grant Program Project Title and Principal Investigators FY 2014 Federal Funding * FY 2014, NY, RI, WHOI Buy Out or Build Back? A Comparative Assessment of Approaches to Employing Public Stewards Academies in Maryland (Dana R. Fisher) $69,999 $35,007 MI Development of Stable Open Channel

165

Project Title: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY  

Broader source: Energy.gov (indexed) [DOE]

DOE Code: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY # 258 Project lnfonnation Rewire electrical to pole at 77SHX10 Mike Preston Date: 11-19-09 Contractor Code: Project Overview No~ rea has been previously disturbed. The trenching will be th,ugh pre-existing right of way for the 1. What are the environmental ~ ~=~d ~ impacts? 2. What is the legal location? Repair a~ replacement of electrical lines to the Pole next to well at 77S~1 0. This will require trenching 3. What is the duration of the project? across the road a~ to the pole. Removing old lines and replacement of lines. 4. What major equipment will be used if any (wor1< over rig, drilling rig, 1 day etc.)? Back hole The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

166

NEPA COMPLIANCE SURVEY Project Information Project Title: Liner Drilling Date:  

Broader source: Energy.gov (indexed) [DOE]

Liner Drilling Date: Liner Drilling Date: 4-5-10 DOE Code: 71092 Cont ractor Code: 8067-766 Project Lead: Frank Ingham Project Overview Nothing out of the ordinary for drilling an existing location 1. What are the environmental impacts? NE SW Sec 21 , T39N, R78W (45-3-X-21 well) 2. What is the legal location? 3. What is the duration of the project? Approximately a week 4 . What major equipment will be used if any (work over rig, drilling rig, Drilling Rig etc.)? Will Drill out of 9 5/8 caslng with liner drillng assembly. After drilling approximately 750 to 1000 ft, will test liner hanging assembly set and retrieve multiple times. The table b elow is to be completed by the Project Lead and reviewed by the Environmental Specialis t and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey a

167

NEPA COMPLIANCE SURVEY Project Information Project Title: Express Stack Tools  

Broader source: Energy.gov (indexed) [DOE]

Express Stack Tools Express Stack Tools Date: 11/16/2010 DOE Code: 6730.020.81023 Contractor Code: 8067-971 Project Lead: Brian Black Project Overview 1) This project will test open and cased Hole logging tools in multiple wells. The tools to be testied include: 1. Brief project description [include anything that could impact the natural gamma, borehole temperature, compensated neutron, compensated density with PE, dual environment] induction/short guard, neutron prompt gamma, and acoustic televiewer tool. Radioactive sources will be run in the well as part of the toolstring. 2. Legal location 3. Duration of the project 2) 48-X-28 well location, SE %, SW %, Tsp 39N Rng 78W, Section 28; 45::3-X-21 well location, NE %, SW 4. Major equipment to be used %, Tsp 39N, Rng 78W, Section 21; 46-TpX-10 well location, NE %, SW Y.., Tsp38N, Rng 78W, Section 10.

168

Project Information Form Project Title Potential to Build Current Natural Gas Infrastructure to Accommodate  

E-Print Network [OSTI]

Project Information Form Project Title Potential to Build Current Natural Gas Infrastructure Project Natural gas is often touted as a `bridge' to low carbon fuels in the heavy duty transportation sector, and the number of natural gas-fueled medium and heavy-duty fleets is growing rapidly. Research

California at Davis, University of

169

Project Information Form Project Title Routing Strategies for Efficient Deployment of Alt. Fuel Vehicles for  

E-Print Network [OSTI]

agency or organization) US DOT $90,000 Total Project Cost $90,000 Agency ID or Contract Number DTRT13-GProject Information Form Project Title Routing Strategies for Efficient Deployment of Alt. Fuel-UTC29 Start and End Dates May 16, 2014 to May 31, 2015 Brief Description of Research Project

California at Davis, University of

170

Project Information Form Project Title Evaluation of the Combined Effect of Recycled Asphalt Pavement (RAP),  

E-Print Network [OSTI]

(s) and Amounts Provided (by each agency or organization) Caltrans $90,315 Total Project Cost $90,315 Agency IDProject Information Form Project Title Evaluation of the Combined Effect of Recycled Asphalt of Research Project As virgin material sources become increasingly scarce, and the volume of pavement material

California at Davis, University of

171

Project Information Form Project Title Environmentally Friendly Driving Feedback Systems Research and  

E-Print Network [OSTI]

Provided (by each agency or organization) Caltrans $136,000 Total Project Cost $136,000 Agency IDProject Information Form Project Title Environmentally Friendly Driving Feedback Systems Research of Research Project Among several strategies to reduce fuel consumption and greenhouse gas emissions from

California at Davis, University of

172

Project Information Form Project Title Design and Analysis of Feebate Policies for Sustainable ZEV and Other  

E-Print Network [OSTI]

(s) and Amounts Provided (by each agency or organization) US DOT $36,442 Total Project Cost $36,442 Agency IDProject Information Form Project Title Design and Analysis of Feebate Policies for Sustainable ZEV of Research Project Zero-emission vehicles (ZEVs) are expected to play a critical role in decarbonizing light

California at Davis, University of

173

Project Information Form Project Title Evaluation of the Combined Effect of Recycled Asphalt Pavement (RAP),  

E-Print Network [OSTI]

(s) and Amounts Provided (by each agency or organization) Caltrans $90,538 Total Project Cost $90,538 Agency IDProject Information Form Project Title Evaluation of the Combined Effect of Recycled Asphalt of Research Project As virgin material sources become increasingly scarce, and the volume of pavement material

California at Davis, University of

174

Project Information Form Project Title Exploring Unintended Environmental and Social-Equity Consequences of  

E-Print Network [OSTI]

to simulate the effect of plans on rents, location of low income households, and travel (mode, trips, autoProject Information Form Project Title Exploring Unintended Environmental and Social and End Dates September 1, 2014 to August 31, 2015 Brief Description of Research Project Communities

California at Davis, University of

175

NEPA COMPLIANCE SURVEY Project Information Project Title: Casing Drilling Test  

Broader source: Energy.gov (indexed) [DOE]

Casing Drilling Test Casing Drilling Test Date: 5-17-201 1 DOE Code: 6730-020-72000 Contractor Code: 8067-806 Project Lead: Marl< Duletsky Project Overview 1, Brief project description ~nclude The existing 13-1-SX-23 location and entry road will be reworlproject 4. Major equipment to be used

176

Project title: Cottonwood-Roseville Optical Groundwire Project  

Broader source: Energy.gov (indexed) [DOE]

Cottonwood-Roseville Optical Groundwire Project Cottonwood-Roseville Optical Groundwire Project Requested By: Joe Oloriz Mail Code: N5706 Phone: 916-353-4773 Date Submitted: 7-3-13 Date Required: 7-8-13 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, switchyards, and facilities throughout California. Western must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. The process of marketing and delivering electric power through transmission facilities requires a great

177

Project Information Form Project Title The Development of Lifecycle Data for Hydrogen Fuel Production and  

E-Print Network [OSTI]

Project Information Form Project Title The Development of Lifecycle Data for Hydrogen Fuel will be technologies and fuels related to renewable hydrogen. The literature review will produce a set of hydrogen hydrogen or hydrogen produced with technologies or fuels not currently in the LCFS. The study will assess

California at Davis, University of

178

EIS-0378: Port Angeles-Juan de Fuca Transmission Project, WA  

Broader source: Energy.gov [DOE]

This EIS assesses DOE decision to approve the Sea Breeze Transmission project for a Presidential permit for through DOE's Office of Electricity Delivery and Energy Reliability and for approval for interconnection into the federal transmission system through the Bonneville Power Administration (BPA).

179

RECIPIENT:Bowling Green State University STATE: OH PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

', ', , , 1'.1 'Pagf;: 1 of 2 RECIPIENT:Bowling Green State University STATE: OH PROJECT TITLE: Coastal Ohio Wind Project for Reduced Barriers to Deployment of Offshore Wind Energy Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number COP DE-EE0003871 GFO-0003871-001 EE3871 Based on my review oftlle information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 45I.IA), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

180

TITLE: HVAC TESTING & BALANCING FOR MAJOR AND MINOR PROJECTS OBJECTIVE AND  

E-Print Network [OSTI]

TITLE: HVAC TESTING & BALANCING FOR MAJOR AND MINOR PROJECTS OBJECTIVE AND PURPOSE: To provide an independent test & balance for the adjustment of all HVAC systems in all major projects and minor projects

Fernandez, Eduardo

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

RECIPIENT:Chesterfield County PROJECT TITLE: EECBG Lighting Retrofit  

Broader source: Energy.gov (indexed) [DOE]

Chesterfield County Chesterfield County PROJECT TITLE: EECBG Lighting Retrofit Page 1 of2 STATE: VA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000013 DE-EE0000874 GFO-0000874-001 0 Based 011 my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution;

182

RECIPIENT:Utah County STATE: UT PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

Utah County STATE: UT Utah County STATE: UT PROJECT TITLE: EECBG - Utah County Energy Efficiency Retrofits Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-FOA-OOOOO13 EEOOOO889 GFO-O000889-002 EEO Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: Cx, EA, EIS APPENDIX AND NUMBER: Description: A11 Technical advice and planning assistance to international, national, state, and local organizations. A9 Information gathering (including, but not limited to, literature surveys, Inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

183

RECIPIENT:Hull Municipal Light Plant STATE: MA PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

: : Page 1 01 :L RECIPIENT:Hull Municipal Light Plant STATE: MA PROJECT TITLE: Hull Offshore Wind Research and Development Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number 09EE0000326 DE-EE0000326 GFO-OO00326-001 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the foUowing determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution; and

184

Standard Operating Procedure (SOP) for (title of project, experiment, reaction or process) Date of Preparation: ____________________________  

E-Print Network [OSTI]

Standard Operating Procedure (SOP) for (title of project, experiment, reaction or process and ensuring that this procedure is carried out: _________________________________________________ HEALTH

Sura, Philip

185

Project Information Form Project Title Bicyclist Behavior in San Francisco: A Before-and-After Study of the  

E-Print Network [OSTI]

Project Information Form Project Title Bicyclist Behavior in San Francisco: A Before(s) and Amounts Provided (by each agency or organization) Caltrans $56,707 Total Project Cost $56,707 Agency ID of Research Project Many cities in California are investing bicycle infrastructure as a way to increase

California at Davis, University of

186

Project Information Form Project Title White Paper on the Future of Passenger Travel Demand in the United  

E-Print Network [OSTI]

each agency or organization) Caltrans $26,383 Total Project Cost $26,383 Agency ID or Contract NumberProject Information Form Project Title White Paper on the Future of Passenger Travel Demand DTRT13-G-UTC29 Start and End Dates September 2014 to June 2015 Brief Description of Research Project

California at Davis, University of

187

Project Information Form Project Title Do California Highways Act as Barriers to Gene Flow for Ground-Dwelling  

E-Print Network [OSTI]

(by each agency or organization) Caltrans $78,395 Total Project Cost $78,395 Agency ID or ContractProject Information Form Project Title Do California Highways Act as Barriers to Gene Flow of Research Project Roads can act as significant barriers to wildlife dispersal, creating small fragmented

California at Davis, University of

188

Project Information Form Project Title White Paper on the Future of Passenger Travel Demand in the United  

E-Print Network [OSTI]

each agency or organization) DOT $26,383.66 Total Project Cost $26,383.66 Agency ID or Contract NumberProject Information Form Project Title White Paper on the Future of Passenger Travel Demand Project This white paper will summarize recent research findings pertaining to future passenger travel

California at Davis, University of

189

Project Information Form Project Title White Paper on the Effectiveness of Land Use and Demand Strategies in  

E-Print Network [OSTI]

DOT $12,000 Cal Trans Total Project Cost $42,533 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title White Paper on the Effectiveness of Land Use and Demand and End Dates June 30, 2014 to January 30, 2015 Brief Description of Research Project Reducing vehicle

California at Davis, University of

190

RECIPIENT:EES I PROJECT TITLE u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

EES EES I PROJECT TITLE : u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION Tennessee Energy Efficient Schools Initiative Ground Source Heat Pump Page 1 of2 ~ ~~ STATE: TN Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE·FOA-EEOOOO116 DE-EEOOO3007 GFO..QOO3007-OO3 0 Based on my review o(tbe informafioD concerning the proposed actioD, as NEPA Compliance Officer (authorized under DOE Order-451.1A),1 have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including , but nollimited 10, literature surveys, inventories, audits), data analysis (including computer modeling). document preparation (such as conceptual design or feasibility studies, analytical energy supply

191

PROJECT TITLE: EECBG u.s. DEPARIIIIENI OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

Plano Plano PROJECT TITLE: EECBG u.s. DEPARIIIIENI OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DEIERlIlINAIION Page 1 of2 STATE: TX Funding Opportunity ADDoum::tmtnt Number PrO(urtment Instrument Number NEPA Control Number em Numbu DE·FQA-OOOOQ13 DE-EE0000969 0 Based on my review orlbe information concuning the proposed action, as N[PA Compliance Officer (authorized under DOE Order 4SI.IA), I bave made the rollowing ddtnnination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits). data analysis (including computer modeling). document preparation (such as conceptual deSign or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution;

192

www.arts.canterbury.ac.nz/internships Project Title: Health, History and Digital  

E-Print Network [OSTI]

project on the history of unfree labour in the Pacific. The intern will link the database to other onlinewww.arts.canterbury.ac.nz/internships Project Title: Health, History and Digital Humanities: The project explores the health history of indentured labourers in Fiji. The intern will digitise microfilm

Hickman, Mark

193

Title: CEL Solar Photovoltaic Power Project in El Salvador Principal Investigator: Abbas Ghassemi  

E-Print Network [OSTI]

Title: CEL Solar Photovoltaic Power Project in El Salvador Principal Investigator: Abbas Ghassemi solar resource, studying different technology options, anticipating performance, and evaluating the economics of the solar power technologies. The NMSU team is evaluating the potential environmental impacts

Johnson, Eric E.

194

Department of Industrial Engineering Spring 2010 Project Title: Angel Wings Bicycle Seat  

E-Print Network [OSTI]

PENNSTATE Department of Industrial Engineering Spring 2010 Project Title: Angel Wings Bicycle Seat Overview The Angel Wings Bicycle Seat is the only two padded bike seat that moves with rides with the rider

Demirel, Melik C.

195

Title I design summary report, initial tank retrieval systems, project W-211  

SciTech Connect (OSTI)

This document provides the Title I (preliminary) design for the Tank 241-SY-101 (101-SY) retrieval system. The design reflects an integrated retrieval approach for 101-SY, whereby the existing mitigation pump will be used to mix the waste and Project W-211 will provide for waste removal. The Title I Design Summary Report includes narrative and sketches that describe the technical aspect of the project, as well as updated cost and schedule baselines for the 101-SY retrieval system.

Rieck, C.A.

1995-03-01T23:59:59.000Z

196

The following National Sea Grant aquaculture research projects were awarded in FY2010-Program Investigator Investigator Affiliation Project Title  

E-Print Network [OSTI]

The following National Sea Grant aquaculture research projects were awarded in FY2010- 2011: Sea Grant College Program Investigator Investigator Affiliation Project Title FY 10-11 Federal Share* Alaska Sea Grant Eckert University of Alaska Fairbanks Red King Crab Aquaculture in Alaska - Release

197

HQ State HQ City Name of Primary Selectee Project Type Project Title and Brief Project Description  

Broader source: Energy.gov (indexed) [DOE]

Total Project Value Total Project Value Including Cost Share AZ Fort Defiance Navajo Tribal Utility Authority Company Smart Grid Workforce Training (Topic B) Navajo Tribal Utility Authority Smart Grid Workforce Training Program - Develop a workforce that is well-trained and committed to the mission of modernizing NTUA's distribution services, including an expeditious and well- built smart grid system. The training program is designed to maximize employment opportunities for citizens of the Navajo Nation located on the reservation. Arizona New Mexico $704,486 $1,408,971 $704,486 $1,408,971 Glendale Glendale Community College Developing and Enhancing Workforce Training Programs (Topic A) Southern California Utility Initiative - Expand training curricula and programs in the Southern California region. The project will raise awareness and

198

Title of Project: Scoping Data Access and Integration Needs to Facilitate Better Management of Research Innovation  

E-Print Network [OSTI]

Title of Project: Scoping Data Access and Integration Needs to Facilitate Better Management-Madison Participants: P.S. Sriraj, Paul Metaxatos, Piyushimita (Vonu) Thakuriah Status: Active Objective: This project of the intended use and value of these databases. 3. Identify existing access procedures to WisDOT databases

Illinois at Chicago, University of

199

Project Title: Reciprocal interactions between bark beetles and wildfire in subalpine forests: landscape patterns and the  

E-Print Network [OSTI]

Project Title: Reciprocal interactions between bark beetles and wildfire in subalpine forests@uwyo.edu William H. Romme Colorado State University Dept. of Forest, Rangeland, and Watershed Stewardship, Fort-Kind and Financial Contributions: $242,868 Abstract: Our project addresses Task 1 in AFP 2006-2. Wildfire and bark

Turner, Monica G.

200

Project Title: Complete System-Level Efficient and Interoperable...  

Office of Environmental Management (EM)

and architecture since a microgrid will be likely upgraded from an existing system. 2014 Smart Grid R&D Program Peer Review Project Summary 2 2014 Smart Grid R&D Program Peer...

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Project Title: SPANA A Multimedia Tool for Learning Speech Analysis  

E-Print Network [OSTI]

valuable advice on programming techniques and useful materials on handling this project. He also took care crossing measurements, a diagram with both average energy and zero crossing rate of the speech signal

Mak, Man-Wai

202

HQ State HQ City Name of Primary Selectee Project Type Project Title and Brief Project Description  

Broader source: Energy.gov (indexed) [DOE]

Participant Participant Share Total Project Value Including Cost Share AZ Fort Defiance Navajo Tribal Utility Authority Company Smart Grid Workforce Training (Topic B) Navajo Tribal Utility Authority Smart Grid Workforce Training Program - Develop a workforce that is well-trained and committed to the mission of modernizing NTUA's distribution services, including an expeditious and well-built smart grid system. The training program is designed to maximize employment opportunities for citizens of the Navajo Nation located on the reservation. Arizona New Mexico $704,486 $704,486 $1,408,972 $704,486 $704,486 $1,408,972 Glendale Glendale Community College Developing and Enhancing Workforce Training Programs (Topic A) Southern California Utility Initiative - Expand training curricula and

203

TITLE  

Office of Legacy Management (LM)

. . . . . . . . . . . . . . . -, , / AMC 000102 ( Nevada DOE/NV--1106-REV. 1 1 Environmental Restoration Project Subsurface Completion Report for Amchitka Underground Nuclear Test Sites: Long Shot, Milrow, and Cannikin Revision No.: 1 September 2006 Approved for public release: further dissemination unlimited Environmental Restoration Project U.S. Department Of Energy National Nuclear Securlty Administration Nevada Sile OMW i - Available for public sale, in p a p from: U.S. Department of Commerce National Technical Information Service 5285 Poa Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Ernail: prdtr$@ntis.gov Online ordering: htto:/hvww.n~~.~ov/ordenn~.htm Available electronically at htt~://www.osti.rov/hrid~e Available for a processing fee to U.S. Department of Energy and its contractors,

204

TITLE  

Office of Legacy Management (LM)

CULTURAL RESOURCES STUDY CULTURAL RESOURCES STUDY BACKQROUND RESEARCH REPORT Off-NfS Cukural Rasowcmr Studks: Background Research for Project Shot11 Prepared by Maureen King Alvin R. McLane and William Gray Johnson MAY 1993 DESERT RESEARCH INSTITUTE CULTURAL RESOURCES STUDY BACKGROUND RESEARCH REPORT Off-NTS Cultural Resources Studies: Background Research for Project Shoal Prepared by Maureen King Alvin R. McLane and William Gray Johnson Prepared for the U.S. Department of Energy Nevada Field Office Las Vegas, Nevada This document is UNCLASSIFIED Derivative , , ::/>.: ; , . / I : Classifier - & ? " A . + - = / . /.. Desert Research Institute ate.:^^:,'& MAY 1993 The work upon which this report is based was supporred by the U.S. Department of h e r g y under Contract #DE-AC08-90NV10845

205

title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

April 21, 2003 April 21, 2003 April 21, 2003 Bakul Banerjee Bakul Banerjee Project Engineer Project Engineer MOU/SOW MOU/SOW NEU MOU and FY03 SOW are waiting for Mont's signature. SOW NEU MOU and FY03 SOW are waiting for Mont's signature. SOW contains work for three engineers. contains work for three engineers. Princeton FY03 SOW and Caltech FY03 SOW were signed in March. Princeton FY03 SOW and Caltech FY03 SOW were signed in March. Caltech FY03 SOW and MOU will be modified to include T2 Caltech FY03 SOW and MOU will be modified to include T2 operations work after UCSD and UFL MOUs are approved. operations work after UCSD and UFL MOUs are approved. UCDavis UCDavis FY03SOW was signed by Dr. Ko and waiting for FY03SOW was signed by Dr. Ko and waiting for Bauerdick

206

W.A. Parish Post-Combustion CO{sub 2} Capture and Sequestration Project Phase 1 Definition  

SciTech Connect (OSTI)

For a secure and sustainable energy future, the United States (U.S.) must reduce its dependence on imported oil and reduce its emissions of carbon dioxide (CO{sub 2}) and other greenhouse gases (GHGs). To meet these strategic challenges, the U.S. wiU have to create fundamentally new technologies with performance levels far beyond what is now possible. Developing advanced post-combustion clean coal technologies for capturing CO{sub 2} from existing coal-fired power plants can play a major role in the country's transition to a sustainable energy future, especially when coupled with CO{sub 2}-enhanced oil recovery (CO{sub 2}-EOR). Pursuant to these goals, NRG Energy, Inc. (NRG) submitted an application and entered into a cost-shared collaboration with the U.S. Department of Energy (DOE) under Round 3 of the Clean Coal Power Initiative (CCPI) to advance low-emission coal technologies. The objective of the NRG W A Parish Post-Combustion CO{sub 2} Capture and Sequestration Demonstration Project is to establish the technical feasibility and economic viability of post-combustion CO{sub 2} capture using flue gas from an existing pulverized coal-fired boiler integrated with geologic sequestration via an enhanced oil recovery (EOR) process. To achieve these objectives, the project will be executed in three phases. Each phase represents a distinct aspect of the project execution. The project phases are: Phase I. Project Definition/Front-End Engineering Design (FEED) Phase ll. Detailed Engineering, Procurement & Construction Phase III. Demonstration and Monitoring The purpose of Phase I is to develop the project in sufficient detail to facilitate the decision-making process in progressing to the next stage of project delivery. Phase n. This report provides a complete summary of the FEED study effort, including pertinent project background information, the scope of facilities covered, decisions, challenges, and considerations made regarding configuration and performance of the facility, along with the conceptual design and estimate results. The findings of this report should be considered conceptual in nature and are conditioned on the statements contained herein. The cost of preparing this report (including the FEED study described herein) was funded in part by a $167-million grant provided by the U.S. DOE.

Armpriester, Anthony; Smith, Roger; Scheriffius, Jeff; Smyth, Rebecca; Istre, Michael

2014-02-01T23:59:59.000Z

207

Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Site Map Site Map Home Publications Software Facilities Links Staff Glazing Materials Chromogenics LowE and Spectrally Selective Deposition Processes Characterization New Materials Advanced Systems Superwindows Integrated Window Systems Gas-Filled Panels Window Properties Infrared Laboratory and Traversing System MoWiTT Window+5 Development Therm Development Film Coefficients Condensation Resistance Comfort Models Field Measurements LBNL Role in NFRC Optics Database Daylighting IEA Task 21 Lightshelves/Lightpipes Tools for Daylighting Prediction Demonstrations Daylighting Controls Residential Performance Energy Star ResFen Development ECW Demonstrations Annual Energy Rating Field Tests and Monitoring Projects

208

TITLE  

Office of Legacy Management (LM)

2 Velma Avenue 2 Velma Avenue Columbus, 0h.o 4321 1-2497 6141297-2300 Fax: 297-241 1 OH I 0 HISTORICAL SOCIETY SlSCE 1885 February 23, 1996 David G. Adler, Site Manager F o m r Sites Restoration Division Department of Energy Oak Ridge Operations Office P.O. 80x 200T Oak Ridge, Tennessee 37831 -8723 Dear Mr. Adler: Re: 8 8 T Metal Building, Columbus, Ohio This is in response to your correspondence, received on February 22, 1996, regarding the project noted above. My staff has reviewed carefully the information provided. Based on the description of the proposed work and photographs provided, it is my opinion that the proposed work, if completed as proposed, will have no effect on the integrity of the B 8 T Metal building, which is eligible for the National Register of Historic Places under Criterion C. No further coordination with

209

FINAL TECHNICAL REPORT Project Title: Environmental Impacts of Wind Power Development on the Population Biology  

E-Print Network [OSTI]

Collaborative Abby Arnold, Executive Director, American Wind Wildlife Institute,aarnold@awwi.org, 202- 535-7800 (x105) Taber D. Allison, Director of Research and Evaluation, American Wind Wildlife Institutei FINAL TECHNICAL REPORT Project Title: Environmental Impacts of Wind Power Development

Sandercock, Brett K.

210

Title: Use of Physical Barriers to Prevent Borer Infestation of Apple Burrknots Project Leaders  

E-Print Network [OSTI]

Title: Use of Physical Barriers to Prevent Borer Infestation of Apple Burrknots Project Leaders of burrknot tissue on apple dwarfing rootstocks is an increasing problem throughout the northeast. One into the winter. We also discuss economic considerations. Background and Justification: Apple growers

Agnello, Arthur M.

211

TITLE  

Office of Legacy Management (LM)

Corporare Center Corporare Center f 5 1 Lalayerre Drive P.O. Box 350 Oak Ridge. Tennewt 3783 1.0350 Facsimile: 1 6 1 5 1 220.2 100 ~ o b No. 14501, FUSRAP Project DOE Contract NO. DE-AC05-9 10R2 194 9 Code: 7340/WBS: 135 U.S. Department of Energy Oak Ridge Field Office P . O . BOX 2001 Oak Ridge, Tennessee 37831-8723 Attention: David G. hdler, Site Manager , Former Sites Restoration Division subject: Hazard Assessment for Residual Contaminztion at the Former Associate Aircraft S i t e ' ( P 2 S ) Dear Mr. Adler: Based on sample results obtained a t A4S, uranium-238 concentrations above the site specific criteria (35 pCi/g) were found in a small sub-slab srsa in Section 1 of the former AAS building. The sample results of the location indicated radioactive contamination at a maximum concentration of 134 pci/g. T

212

WA-TRIBE-STILLAGUAMISH TRIBE OF INDIANS  

Broader source: Energy.gov (indexed) [DOE]

WA-TRIBE-STILLAGUAMISH TRIBE OF INDIANS WA-TRIBE-STILLAGUAMISH TRIBE OF INDIANS Energy Efficiency and Conservation Block Grant Program Location: Tribe WA-TRIBE- STILLAGUAMISH TRIBE OF INDIANS WA American Recovery and Reinvestment Act: Proposed Action or Project Description The Stillaguamish Tribe proposes to expand its Stillaguamish Tribe Transit Services (STTS). For the past three years, the STTS has employed 14-passenger buses to transport clients to and from the tribal medical, dental, behavioral health and massage clinics. Often the demand-response requests that come to STTS are for one to three passengers at a time; therefore, funds are being requested to purchase a hybrid sedan to transport clients. Conditions: None Categorical Exclusion(s) Applied: A1, B1.32, B5.1 *-For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, see Subpart D of 10 CFR10 21

213

Project Title: Translating Solanaceae Sequence Diversity and Trait Variation into Applied Outcomes through Integrative Research, Education, and Extension  

E-Print Network [OSTI]

Project Title: Translating Solanaceae Sequence Diversity and Trait Variation into Applied Outcomes. Project Director: David Douches (douchesd@msu.edu), Michigan State University Co-Directors: Robin Buell@hort.oregonstate.edu), Oregon State University Project Website: http://solcap.msu.edu The SolCAP project was initiated September

Douches, David S.

214

Application for CALS-CCE 2013 Summer Internship Title of project: Communicating Climate Change to New Yorkers  

E-Print Network [OSTI]

Application for CALS-CCE 2013 Summer Internship Title of project: Communicating Climate Change County Project summary and intended outcomes (no more than 5-10 sentences): Cornell Climate Change): The intern will support the Cornell climate change project by working to develop outreach materials

Keinan, Alon

215

Project title: Stimulation at Desert Peak and Bradys reservoirs: modeling with the coupled THM code FEHM  

Broader source: Energy.gov [DOE]

Project title: Stimulation at Desert Peak and Bradys reservoirs: modeling with the coupled THM code FEHM presentation at the April 2013 peer review meeting held in Denver, Colorado.

216

NEPA COMPLIANCE SURVEY Project Information Project Title: South Compost Facility #2 Da  

Broader source: Energy.gov (indexed) [DOE]

South Compost Facility #2 Da South Compost Facility #2 Da te: 1-6-10 DOE Code: 6730.020.0000 Contracto r Code: 8067-788 Project Lead: Anthony Bowler Project Ove rview The purpose of the project is to build an additional compos ling facility at RMOTC to allow for 1. Bnef project description [include anything that increased soil remediation capabilities. The project will involve removing the top soil and placing could impact the environment] it adjacent to the operational area ,in a "signed" pile for reclamation . Additional scraping of the 2. Legal location area (6"-8'1 will generate material which will be used to erect a 2' berm around the location to 3. Duration of the project control runon/runoff. A perimeter fence and a locking gate will be installed around the facility's

217

Project Information Form Project Title Strategies for Transitioning to Zero-Emission Vehicles--Freight  

E-Print Network [OSTI]

,884 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates June 1, 2014 � August 15, 2014 Brief Description of Research Project According to the EIA, freight modes accounted for 29% of transportation fuel, not anticipated) Web Links Reports Project website http://ncst.ucdavis.edu/white-paper/ucd-dot-wp3-1b #12;

California at Davis, University of

218

BayWa Group | Open Energy Information  

Open Energy Info (EERE)

BayWa Group BayWa Group Jump to: navigation, search Name BayWa Group Place Munich, Germany Zip 81925 Sector Services, Solar Product Germany-based company with international operations specialised in wholesale and retail and in providing services. The company is also active in the biofuel and solar sectors. Coordinates 48.136415°, 11.577531° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.136415,"lon":11.577531,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

219

NEPA COMPLIANCE SURVEY Project Information Project Title: T-2-33  

Broader source: Energy.gov (indexed) [DOE]

2-33 2-33 Date: 12-22-2010 DOE Code: Contractor Code: Project Lead: Bernard Winfree Project Overview 1. What are the environmental The existing manifold building will be moved off site. A backhoe will be used to dig up the manifold piping, impacts? after all possible fluids have been sucked out. Wells 88-ax-28, 17 -stx-27 and 18-stx-27 will be tied directly into the tank The remaining pipes will be cut off at the lowest point. At this time, a compos it sample of the 2. What is the legal location? surrounding soil soil will be taken . Any contaiminated soils will be hauled to the compost facility. When the 3. What is the duration of the project? samples come back under the established limits, the hole will be backfilled with native materials and the site

220

NEPA COMPLIANCE SURVEY Project Information Project Title: T-1-21 Restoration  

Broader source: Energy.gov (indexed) [DOE]

1-21 Restoration 1-21 Restoration Date: 12-22-2010 DOE Code: Contractor Code: Project Lead : Bernard Winfree Project Overview 1. What are the environmental The existing building will be removed from the site. A backhoe will be used to dig up the manifold piping, impacts? after all possible fluids have been sucked out of the piping. We will then cut off the pipes at the lowest 2. What is the legal location? possible point At this time a com posit soil sample will be taken of the area. When the samples come back under the established limits, we will backfill the hole with the existing materials and recontour the site to 3. What is the duration of the project? perexisting conditions. Reseeding will be initiated when the proper seed mix is established. This is an

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

RECIPIENT:NREL PROJECT TITLE: ESIF Excavation Soil Stockpile; NREL Tracking No. 11-013  

Broader source: Energy.gov (indexed) [DOE]

PROJECT PROJECT TITLE: ESIF Excavation Soil Stockpile; NREL Tracking No. 11-013 Page 1 of2 **...*... @-~ .. @ '"',. .. ~ STATE: CO Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number NREL-11-013 GOO Based on my review ufthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: DOE/EA· Final Supplement-II to Final Site-Wide Environmental Assessment of the National Renewable Energy Laboratory's 1440·5·11 (NREL) South Table Mountain Complex (November 2009) DOE/EA· Final Site-Site Wide Environmental Assessment of the National Renewable Energy Laboratory's (NREL) South

222

Final Project Report for project titled "Fluoroalkylphosphonic-acid-based proton conductors"  

SciTech Connect (OSTI)

The overall objective of this research was to create new proton-conducting polymer electrolytes for use in energy conversion devices including hydrogen fuel cells that could operate at high temperatures (95-130 C) and under low relative humidity (< 50% RH) conditions. The new polymers were based on the fluoroalkylphosphonic and phosphinic acid (FPA) groups (see illustration below) which offer prospects for rapid proton transport by a proton-hopping mechanism similar to that which operates in phosphoric acid, a well-known proton-transporting electrolyte that is used in a class of hydrogen fuel cells that work well under the conditions noted above and are already commercially successful. The two specific project objectives were as follows: (1) synthesize and characterize new proton-conducting electrolytes based on the fluoroalkylphosphonic and phosphinic acid (FPA) functional groups; and (2) create and apply new computer models to study protonic conduction in FPA-based electrolytes. The project was successful in creating the desired polymer electrolytes and also a series of molecular model compounds which were used to study proton transport in FPA electrolytes in general. Computer models were created to study both structure and proton-transport dynamics in the electrolytes, particularly the molecular model compounds. Rapid proton transport by a hopping mechanism was found in many of the model compounds and correlations with transport rates with molecular structure were identified. Several polymeric analogs of FPA model compounds were prepared and studied, however FPA-based polymeric materials having very high protonic conductivities under either wet or dry conditions were not obtained. Several possible reasons for the failure of polymeric materials to exhibit the expected high protonic conductivities were identified, including a failure of the polymers to adopt the phase-separated secondary structure/morphology necessary for high proton conductivity, and an unexpected polymer crosslinking effect of acidic groups having two P-OH groups. The project has lent insight into how FPA groups transport protons in both liquid and polymeric forms, which provides guidance to future efforts to design and prepare future generations of proton-conducting polymer electrolytes for hydrogen fuel cells and other types of electrochemical energy conversion and storage devices.

Stephen Creager

2011-12-08T23:59:59.000Z

223

RECIPIENT:City of Ann Arbor PROJECT TITLE: Ann Arbor Wind Generator  

Broader source: Energy.gov (indexed) [DOE]

Ann Arbor Ann Arbor PROJECT TITLE: Ann Arbor Wind Generator " ) STATE: MI Funding Opportunity Announcement Number ProcurementInstrument Number NEPA Control Number CID Number DE-EE0000447 GFO-0000447-001 0 Based on my review oCthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution; and

224

Program or Field Office: Project Title and I. D. No.: Locatio  

Broader source: Energy.gov (indexed) [DOE]

D. No.: Locatio n: U.S. Department of Energy Office of Legacy Management Categorical Exclusion Determination Form Office of Legacy Management Acid Pond Property Disposition Near the Spook, Wyoming, Disposal Site. LM # 08-12. Spook, Wyoming Proposed Action or Project Description: The Spook disposal site is located in Converse County, Wyoming, about 32 miles north of Glenrock, and is managed as a Title I Uranium Mill Tailings Radiation Control Act site. The Acid Pond Parcel located just southwest of the disposal site, also known as Vicinity Property SK-001 S, is a previously disturbed area once considered part of the original footprint of the Spook site. This parcel is not associated with current disposal site operations. DOE proposes to disposition the 5.89-

225

TITLE XVII Application Process  

Broader source: Energy.gov [DOE]

The Title XVII Innovative Clean Energy Projects (Title XVII) loan program is currently accepting applications in response to open technology-specific solicitations.

226

2012 EL Project Title and Number: Model-Based Engineering Program Title: Systems Integration for Manufacturing and Construction  

E-Print Network [OSTI]

for Manufacturing and Construction Applications Principal Investigator: Joshua Lubell, 734 Project Staff Name Josh Lubell Robert Lipman Allison Barnard Feeney Simon Frechette Chris Brown Kenway Chen Albert Jones Craig

Perkins, Richard A.

227

Project Title Mobile Device Management. Team Pam Horne, Jolene King, Jim Lehman, Marcus Lill, Terry Schroeder, David Shaw  

E-Print Network [OSTI]

Project Title Mobile Device Management. Team Pam Horne, Jolene King, Jim Lehman, Marcus Lill, Terry and supporting mobile devices that access Purdue data and information. Hypothesis We anticipate there would be several advantages from providing a model of supporting mobile devices. These advantages would be in areas

228

Project Title: Functional Measures of Sea Turtle Hearing ONR Award No: N00014-02-1-0510  

E-Print Network [OSTI]

A t Project Title: Functional Measures of Sea Turtle Hearing ONR Award No: N00014 Moein Bartol Virginia Institute ofMarine Science ABSTRACT In this study, sea turtle hearing and species and physiologically by brainstem evoked potential techniques. Sea turtles employed in this work

229

IMPEE PhD Opportunity Project title: Cyber-physical Systems (CPS) for knowledge discovery, data exploration and human factors  

E-Print Network [OSTI]

IMPEE PhD Opportunity Project title: Cyber-physical Systems (CPS) for knowledge discovery, data exploration and human factors research Supervisor(s): T. Lim, J.M. Ritchie Abstract CPS is an engineering/augmented/mixed reality spaces. R&D interests include (but not limited to): Aural or narrative guidance for product design

Greenaway, Alan

230

Project Year Project Title  

E-Print Network [OSTI]

-friendly visualization tools, such as Google Sketchup, do not enable structural analysis. This makes it extremely

Gray, Jeffrey J.

231

Category:Seattle, WA | Open Energy Information  

Open Energy Info (EERE)

Seattle, WA Seattle, WA Jump to: navigation, search Go Back to PV Economics By Location Media in category "Seattle, WA" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Seattle WA Puget Sound Energy Inc.png SVFullServiceRestauran... 60 KB SVHospital Seattle WA Puget Sound Energy Inc.png SVHospital Seattle WA ... 58 KB SVLargeHotel Seattle WA Puget Sound Energy Inc.png SVLargeHotel Seattle W... 57 KB SVLargeOffice Seattle WA Puget Sound Energy Inc.png SVLargeOffice Seattle ... 57 KB SVMediumOffice Seattle WA Puget Sound Energy Inc.png SVMediumOffice Seattle... 61 KB SVMidriseApartment Seattle WA Puget Sound Energy Inc.png SVMidriseApartment Sea... 58 KB SVOutPatient Seattle WA Puget Sound Energy Inc.png SVOutPatient Seattle W... 63 KB

232

NEPA REVIEW SCREENING FORM DOE/CX-00088 I. Project Title: CH2f"JHill Plateau Remediation Company -  

Broader source: Energy.gov (indexed) [DOE]

10 Number: 10 Number: NEPA REVIEW SCREENING FORM DOE/CX-00088 I. Project Title: CH2f"JHill Plateau Remediation Company - Cleanup Actions, December 2012 to December 2013 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions. e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): CH2MHill Plateau Remediation Company (PRC) will be conducting cleanup actions on the Hanford Site in accordance with the categorical exclusion (CX) referenced in 10 CFR 1021, B, CX B6.1 ''Cleanup actions". PRC Projects include all those identified Sections . 3 and J.l4 of the PRC Contract, DE-AC06-08RL14788. Small-scale, short-term cleanup actions, under RCRA, Atomic Energy Act, or other

233

20121114 Riverton drinking wa...  

Office of Legacy Management (LM)

Where Does My Drinking Water Come From? Where Does My Drinking Water Come From? Riverton, Wyoming, Processing Site F A C T S H E E T ENERGY Legacy Management U.S. DEPARTMENT OF This fact sheet provides information about the Alternative Water Supply System and domestic wells at the Uranium Mill Tailings Radiation Control Act of 1978 Title I processing site at Riverton, Wyoming. The Riverton site is managed by the U.S. Department of Energy Office of Legacy Management. Where Is the Riverton Site? The former Riverton, Wyoming, Processing Site is in Fremont County, 2 miles southwest of the town of Riverton and within the boundaries of the Wind River Indian Reservation (Northern Arapaho and Eastern Shoshone). Why Is It a "Site"? A uranium- and vanadium-ore-processing mill operated on the property from 1958 to 1963. Milling operations created

234

WA_1993_040_REGENTS_OF_THE_UNIVERSITY_OF_CALIFORNIA_Waiver_o...  

Broader source: Energy.gov (indexed) [DOE]

WA1993040REGENTSOFTHEUNIVERSITYOFCALIFORNIAWaivero.pdf WA1993040REGENTSOFTHEUNIVERSITYOFCALIFORNIAWaivero.pdf WA1993040REGENTSOFTHEUNIVERSITYOFCALIFORNI...

235

Project Title: Carbon cycling at the landscape scale: the effect of changes in climate and fire frequency on age distribution, stand structure, and net ecosystem production.  

E-Print Network [OSTI]

Project Title: Carbon cycling at the landscape scale: the effect of changes in climate and fire: Our project addresses Task 1 in RFP 2003-1. Climate, fire (frequency and intensity), and forest@mhub.zoology.wisc.edu, 4 Tinker@uwyo.edu Duration of Project: 3 years Annual Funding Requested from the Joint Fire Science

Turner, Monica G.

236

PROJECT TITLE: Evaluation of Seed Boot and Furrow Opener Configurations for Optimizing Seed and Fertilizer Placement in Simultaneous, Single-Pass Operations with Air Drills under  

E-Print Network [OSTI]

Hr GRC 3 PROJECT TITLE: Evaluation of Seed Boot and Furrow Opener Configurations for Optimizing-seeded into spring wheat stubble at Havre in 2002 is presented in Table 1. The `Morris Gumbo Boot' was included

Maxwell, Bruce D.

237

PI Research Organisation Project Title NE/J024678/1 Dr Christopher Davis University of Reading Driving space weather forecasts with real data  

E-Print Network [OSTI]

Lead Grant Reference PI Research Organisation Project Title NE/J024678/1 Dr Christopher Davis Troposphere and the Routing of Aircraft (EXTRA)Professor Keith Shine University of Reading NE/J023760

238

Category:Yakima, WA | Open Energy Information  

Open Energy Info (EERE)

Yakima, WA Yakima, WA Jump to: navigation, search Go Back to PV Economics By Location Media in category "Yakima, WA" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Yakima WA Puget Sound Energy Inc.png SVFullServiceRestauran... 61 KB SVHospital Yakima WA Puget Sound Energy Inc.png SVHospital Yakima WA P... 58 KB SVLargeHotel Yakima WA Puget Sound Energy Inc.png SVLargeHotel Yakima WA... 58 KB SVLargeOffice Yakima WA Puget Sound Energy Inc.png SVLargeOffice Yakima W... 58 KB SVMediumOffice Yakima WA Puget Sound Energy Inc.png SVMediumOffice Yakima ... 57 KB SVMidriseApartment Yakima WA Puget Sound Energy Inc.png SVMidriseApartment Yak... 59 KB SVOutPatient Yakima WA Puget Sound Energy Inc.png SVOutPatient Yakima WA... 63 KB SVPrimarySchool Yakima WA Puget Sound Energy Inc.png

239

No Slide Title | Department of Energy  

Energy Savers [EERE]

No Slide Title No Slide Title No Slide Title More Documents & Publications Slide 1 Earned Value Management System (EVMS) and Project Analysis Standard Operating Procedure (EPASOP)-...

240

Long-Term Surveillance Plan for the Sherwood Project (UMTRCA Title II) Reclamation Cell, Wellpinit, Washington, February 2001  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Maintenance Program and Maintenance Program Long-Term Surveillance Plan for the DOE Sherwood Project (UMTRCA Title II) Reclamation Cell Wellpinit, Washington February 2001 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract Number DE-AC13-96GJ87335 Task Order Number MAC 01-06 Document Number S00204 DOE/Grand Junction Office Sherwood LTSP February 2001 Page iii Contents 1.0 Introduction............................................................................................................... 1-1 1.1 Purpose ..................................................................................................................... 1-1 1.2 Legal and Regulatory Requirements ........................................................................

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Are non-marine organic-rich shales suitable exploration targets?  

E-Print Network [OSTI]

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Are non-marine organic-rich shales suitable exploration targets? (EARTH-15-SR2) Host institution: University of Oxford Supervisor 1: Stuart Robinson Supervisor 2: Steve Hesselbo (University of Exeter) Project description: Shales

Henderson, Gideon

242

Project title: Phylogenetic Analysis of "New" Homeobox in the lineage leading to Humans Thehomebox genes are extremely interesting and central in the mechanisms establishing form in  

E-Print Network [OSTI]

Project title: Phylogenetic Analysis of "New" Homeobox in the lineage leading to Humans Thehomebox and challenging questions in case of fast initial progress. The core project will involve comparative genome these genes evolutionary. Peter Holland group has found 4 new genes in humans, by comparison to the mouse

Goldschmidt, Christina

243

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Evaluating the resilience of deepwater systems to recover from oil spills  

E-Print Network [OSTI]

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Evaluating the resilience of deepwater systems to recover from oil spills Host institution: Heriot-Watt University Gatliff (BGS), Jeffrey Polton (NOC), Alejandro Gallego and Eileen Bresnan (MSS). Project description: Oil

Henderson, Gideon

244

RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project and Cold War Era Historic District Treatment Plan" (DOERL-97-56); the "Cultural Resources Management Plan" (DOERL-98-10), and other applicable guidance documents and...

245

RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project and Cold War Era Historic District Treatment Plan" (DOERL-97-56; the "Cultural Resources Management Plan" (DOERL-98-10, and other applicable guidance documents and...

246

RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project and Cold War Era Historic District Treatment Plan" (DOERL-97-56); the "Cultural Resources Management Plan" (DOERL-98-10), and other applicable guidance documents and...

247

Title 16 U.S.C. 1278(a) Restrictions on Water Resources Projects...  

Open Energy Info (EERE)

not grant any license for construction of any dam, water conduit, reservoir, powerhouse, transmission line, or other project works under the Federal Power Act on or directly...

248

RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: Energy.gov (indexed) [DOE]

2, Rev 1 MSA Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.4 for Calendar Year 2014 II. Project...

249

RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 MSA Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.4 for Calendar Year 2015. II. Project...

250

RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 MSA Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.4 for Calendar Year 2014 II. Project Description...

251

RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: Energy.gov (indexed) [DOE]

7, Rev 1 MSA Annual Categorical Exclusion for Disconnection of Utilities under 10 CFR 1021, Subpart D, Appendix B, B1.27 for Calendar Year 2014 II. Project Description and Location...

252

RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 MSA Annual Categorical Exclusion for Disconnection of Utilities under 10 CFR 1021, Subpart D, Appendix B, B1.27 for Calendar Year 2015. II. Project Description and Location...

253

Project Title: Air Quality Monitoring in the Coastal Environment of Miami Professor's name: Xinrong Ren________________________________________ ______ _  

E-Print Network [OSTI]

on the campus of the Rosenstiel School of Marine and Atmospheric Science. Atmospheric pollutants include ozone in this project will learn basic knowledge of atmospheric science and air pollution, operate some environmental Ren________________________________________ ______ _ Department: Marine and Atmospheric Chemistry

Miami, University of

254

Awards Received in October 2006 Principal Investigator Department Sponsor Project Title Amount GCO OSP Number  

E-Print Network [OSTI]

OSP Number ABRUNA, HECTOR D DISALVO, FRANCIS J CCMR DOE AN ADVANCED MATERIALS APPROACH TO FUEL CELL RESEARCH PROJECT $33,025 THF 52476 BELL, JAMES F CRSR NASA (GODDARD SFC) COMPOSITION AND WEATHERING HISTORY

Danforth, Bryan Nicholas

255

Awards Received in March 2010 Principal Investigator Department Sponsor Project Title Amount GCO OSP Number  

E-Print Network [OSTI]

FOR VISUAL REALISM IN SCALE-COMPLEX SCENES 98,337. MBF 51958 BARBASCH, DAN MATH NSF UNIPOTENT REPRESENTATIONS B SEELEY, ROBIN WEEKS, HAROLD JOHN SHOALS NSF (NSF BIO) UPGRADE OF SANITATION AND COMMUNICATION, JAMES M NAIC NSF A TECHNOLOGY DEVELOPMENT PROJECT FOR THE LARGE-N / SMALL-D SQUARE KILOMETER ARRAY

Danforth, Bryan Nicholas

256

Year Project Title USGS contact(s) Published paper, data source,  

E-Print Network [OSTI]

information Keywords 1 2003-present Delineation of brine contamination in and near the East Poplar oil field_poplar/index.html Project assesses brine contamination to the shallow aquifers and surface water. Energy Development, Williston Basin, Brine contamination, Groundwater, Surface Water, East Poplar oil field, Fort Peck Indian

Torgersen, Christian

257

Title: Advance Patent Waiver W(A)2011-041  

Broader source: Energy.gov [DOE]

This is a request by GENERAL MOTOR for a DOE waiver of domestic and foreign patent rights under agreement DE-AC36-08GO28308.

258

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

51 Rev. l 51 Rev. l Washington River Protection Solutions LLC - Proposed Actions For CY 2013 Scheduled To Take Place Under CX 81.28, "Placing a Facility in an Environmentally Safe Condition" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions ·e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will place facilities in a cold, dark, and environmentally safe condition during Calendar Year 2013. WRPS will perform all activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & 8 to Subpart D, & CX 81.28. WRPS' facilities include all those identified in

259

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

93 Rev 0 93 Rev 0 River Protection Solutions LLC - Proposed Actions For CY 2013 Scheduled To Take Place Under CX B5.6, "Oil Spill Cleanup" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform actions to remove and cleanup oil and related contaminated materials recovered during oil spill cleanup operations during Calendar Year 2013. WRPS will perform all activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, & ex B5.6. WRPS' facilities include all those identified in the Tank Operations Contract

260

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

38, Rev 1 38, Rev 1 MSA Annual Categorical Exclusion for Electronic Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.7 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform acquisition, installation, operation, modification, and removal of electricity transmission control and monitoring devices, communication systems, data processing equipment, and similar electronic equipment. Activities include, but are not limited to, install fiber optic cable between and within existing buildings; install new conduit and/or replace old conduit; minor

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

2, Rev 0 2, Rev 0 MSA Annual Categorical Exclusion for Facility Safety and Environmental Improvements under 10 CFR 1021, Subpart D, Appendix B, B2.5 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform safety and environmental improvements of a facility (including, but not limited to, replacement and upgrade of facility components) that do not result in a significant change in the expected useful life, design capacity, or function of the facility and during which operations may be suspended and then resumed. Improvements include, but are not limited to, replacement/

262

RL-721 REV3 I. Project Title: NEPA REVIEW SCREENING FORM  

Broader source: Energy.gov (indexed) [DOE]

10 Number: 10 Number: DOE/CX-00051 Washington River Protection Solutions LLC - Proposed Actions For CY 2012 Scheduled To Take Place Onder CX B1.28, "Placing a Facility in an Environmentally Safe Condition" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, etc.): Washington River Protection Solutions LLC (WRPS) will place facilities in a cold, dark, and environmentally safe condition on & near the Hanford Site during Calendar Year 2012. WRPS will perform all activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, & CX B1.28. WRPS' facilities

263

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

48 Rev. 1 48 Rev. 1 Washington River Protection Solutions LLC -Proposed Actions For CY 2013 Scheduled To Take Place Under CX B1.3, "Routine Maintenance" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform routine maintenance services on buildings, structures, infrastructure and equipment during Calendar Year 2013. WRPS will perform all routine maintenance activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, and CX B1.3. WRPS' facilities include all those identified in the Tank Operations Contract Sections J.13

264

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

3, Rev 0 3, Rev 0 MSA Annual Categorical Exclusion for Site Characterization and Environmental Monitoring under 10 CFR 1021, Subpart D, Appendix B, B3.1 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform site characterization and environmental monitoring (including siting, construction, modification, operation, dismantlement, and removal of equipment). Activities would be near-surface, shallow, and in previously disturbed or developed areas; designed to conform with applicable requirements and use best management practices to limit the effects of any resultant ground disturbance.

265

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

7 Rev 0 7 Rev 0 Washington River Protection Solutions LLC Place Under CX 86.1, "Cleanup Actions" Proposed Actions For CY 2013 Scheduled To Take 11. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions- e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform small-scale, short-term cleanup actions, costing ten million or less, under the Resource Conservation & Recovery Act (RCRA), Atomic Energy Act, or other authorities as necessary to reduce risk to human health or the environment from a release or threat of release of a hazardous substance of than high-level radioactive waste and spent nuclear fuel during Calendar Year 2013. WRPS

266

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

62 Rev. 1 62 Rev. 1 Washington River Protection Solutions LLC - Proposed Actions For CY 2013 Scheduled To Take Place Onder CX B5.1, "Actions to Conserve Energy or Water" 11. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions ·e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform actions to conserve energy or water during Calendar Year 2013. WRPS will perform all activities in accordance with the cal exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, & CX 85.1. WRPS' facilities include all those identified in the Tank Operations Contract Sections J.l3 and J.l4. Activities would include, but are not limited to:

267

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

47, Rev 1 47, Rev 1 MSA Annual Categorical Exclusion for Transfer Actions under 10 CFR 1021, Subpart D, Appendix B, Bl.30 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform transfer actions, where the predominant activity is transportation, and where the receipt and storage capacity and management capability for the amount and type of materials, equipment, or waste to be moved already exists at the receiving site; and all necessary facilities and operations at the receiving site are already permitted, licensed, or approved, as appropriate. Transfers may

268

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

87 87 CH2MHill Plateau Remediation Company - Site Characterization and Environmental Monitoring, December 2012 to December 2013 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions- e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): CH2MHill Plateau Remediation (PRC) will be conducting site characterization and environmental monitoring on the Han Site in accordance with the categorical exclusion (CX) referenced in 10 CFR 102 , Appendix B, CX 83.1, ''Site characterization and environmental monitoring''. PRC ects include all those identified Sections J.l3 and J.l4 of the PRC Contract, DE-AC06-0 RL14788. Site characterization and environmental monitoring (including, but not limited to, siting,

269

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

5 5 Washington River Protection Solutions LLC - Renovation of 274-AW Under CX B2.l, "Workplace Enhancements" 11. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will renovate the 274-AW building. The 274-AW building is a 10-wide modular building located in the 200 East Area near the 241-AW and 241-AP Tank Farms. It was installed in 1993 by Eric R. Brown Construction, Inc. as a support facility for 272-AW. The facility currently serves as an office for WRPS' Base Operations managers and engineers. 274-AW is centrally located and easily accessible,

270

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

11, Rev 0 11, Rev 0 MSA Annual Categorical Exclusion for Routine Maintenance and Custodial Services under 10 CFR 1021, Subpart D, Appendix B, Bl.3 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform routine maintenance and custodial services on Hanford buildings, structures, infrastructures, and equipment in previously disturbed and developed areas. Routine maintenance and custodial services include those in MSA contract DE-AC06-09RL14728, Attachment J.3. Buildings, structures, infrastructures, and equipment subject to routine maintenance and custodial services

271

Pacific Northwest Region MAPS dataset retrospective analysis Project Title: USFS Region Six MAPS Dataset Re-analysis for the Development of Management  

E-Print Network [OSTI]

Pacific Northwest Region MAPS dataset ­ retrospective analysis Project Title: USFS Region Six MAPS Dataset Re-analysis for the Development of Management and Climate Change Support Tools for Landbird) demographic dataset may reveal how predicted patterns of climate-related forest fragmentation, pest outbreak

DeSante, David F.

272

Project Title: Reciprocal interactions between bark beetles and wildfire in subalpine forests: landscape patterns and the risk of high-severity fire.  

E-Print Network [OSTI]

1 Project Title: Reciprocal interactions between bark beetles and wildfire in subalpine forests of Wisconsin, Madison, WI Dr. William H. Romme, Colorado State University, Fort Collins, CO Dr. Philip A.firescience.gov #12;2 ABSTRACT The interactions of wildfire and bark beetle outbreaks and their reciprocal influences

Turner, Monica G.

273

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Environmental assessment of deep-water sponge fields in relation to oil and gas  

E-Print Network [OSTI]

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Environmental assessment of deep-water sponge fields in relation to oil and gas activity: a west of Shetland case study industry and government identified sponge grounds in areas of interest to the oil and gas sector

Henderson, Gideon

274

UK Oil and Gas Collaborative Doctoral Training Centre (2015 start) Project Title: Exploring the petroleum potential of a frontier province: Cretaceous stratigraphy and  

E-Print Network [OSTI]

UK Oil and Gas Collaborative Doctoral Training Centre (2015 start) Project Title: Exploring Myanmar. It has been shown that gas and oil exists in the basin and that a considerable unconventional biogenic gas system exists in the deep-waters offshore. The sediments of the Rakhine Basin were deposited

Henderson, Gideon

275

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Quantifying the role of groundwater in hydrocarbon systems using noble gas  

E-Print Network [OSTI]

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Quantifying the role of groundwater in hydrocarbon systems using noble gas isotopes (EARTH-15-CB1) Host institution biodegradation of oil can remove its value ­ but what controls the biodegradation? The deep biosphere plays a key

Henderson, Gideon

276

Advance Patent Waiver W(A)2013-013 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

& Publications WA98023McDERMOTTTECHNOLOGYINCWaiverofDomesticandFo.pdf WA96016AIRPRODUCTSANDCHEMICALSINCWaiverofDomestic.pdf WA96004GECORPORATERESEARCHand...

277

WA_1995_018_OPTICAL_COATING_LABORATORY_INC_Waiver_of_Domesti...  

Broader source: Energy.gov (indexed) [DOE]

Publications WA1995019DONNELLYCORPORATIONWaiverofDomesticandFore.pdf WA1994034AIRPRODUCTSANDCHEMICALSINCWaiverofDomesti.pdf WA1995009AIRPRODUCTSANDCHEMICAL...

278

WA_04_057_CHEMICAL_RESEARCH_AND_LICENSING_CO_Waiver_of_Paten...  

Broader source: Energy.gov (indexed) [DOE]

& Publications WA04064VELOCYSINCWaiverofPatentRgithsUnderaDOECo.pdf WA04063AIRPRODUCTSANDCHEMICALSWaiverofPatentRights.pdf WA04028AIRPRODUCTSANDCHEMICAL...

279

WA_98_023_McDERMOTT_TECHNOLOGY_INC_Waiver_of_Domestic_and_Fo...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

WA06013McDERMOTTTECHNOLOGYINCWaiverofPatentRightst.pdf WA00018PRAXAIRWaiveofDomesticandForeignInventionRi.pdf WA00007COMBUSTIONENGINEERINGINCW...

280

WA_02_021_H2GEN_INNOVATIONS_Waiver_of_Domestic_and_Foreign_P...  

Broader source: Energy.gov (indexed) [DOE]

WA02046QUESTAAIRTECHNOLOGIESWaiverofDomesticandFor.pdf WA02055PRAXAIRWaiverofDomesticandForeignPatentRigh.pdf WA04034NUVERAFUELCELLSINCWaiver...

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

WA_04_009_ROCKWELL_SCIENTIFIC_CO_Wailve_of_Domestic_And_Fore...  

Broader source: Energy.gov (indexed) [DOE]

WA1995019DONNELLYCORPORATIONWaiverofDomesticandFore.pdf WA1995018OPTICALCOATINGLABORATORYINCWaiverofDomesti.pdf WA00030ASEAMERICASRequesttoAssign...

282

WA_1995_019_DONNELLY_CORPORATION_Waiver_of_Domestic_and_Fore...  

Broader source: Energy.gov (indexed) [DOE]

WA00030ASEAMERICASRequesttoAssignTitletoWaiver-Inv.pdf WA1995018OPTICALCOATINGLABORATORYINCWaiverofDomesti.pdf WA04009ROCKWELLSCIENTIFICCOWailve...

283

Program or Field Office: Project Title and I.D. No.:  

Broader source: Energy.gov (indexed) [DOE]

D. No.: D. No.: u.s. Department of Energy Office of Legacy Management Categorical Exclusion Determination Form Office of Legacy Management Routine Maintenance Activities at th e Grand Junction, Colorado, Calibration Model Facility. LM # 42-11. Location: Grand Junction , Colorado Proposed Action or Project Description: DOE proposes to conduct routine maintenance actions as needed at a facility containing calibration borehole test pits. The facility is located just behind the U.S. Department of Energy Grand Junction Office Site on land leased from the Riverview Technology Corporation . Property adjacent to the east side of the facility is owned by the Union Pacific Railroad; east of that is a City of Grand Junction municipal cemetery. Renewal of the lease generally occurs every 5 years

284

Manhattan Project: A Tentative Decision to Build the Bomb<!--Include title  

Office of Scientific and Technical Information (OSTI)

President Franklin Roosevelt's note to Vannevar Bush giving Bush the tentative go-ahead to build the atomic bomb. A TENTATIVE DECISION TO BUILD THE BOMB President Franklin Roosevelt's note to Vannevar Bush giving Bush the tentative go-ahead to build the atomic bomb. A TENTATIVE DECISION TO BUILD THE BOMB Washington, D.C.(1941-1942) Events > Early Government Support, 1939-1942 Einstein's Letter, 1939 Early Uranium Research, 1939-1941 Piles and Plutonium, 1939-1941 Reorganization and Acceleration, 1940-1941 The MAUD Report, 1941 A Tentative Decision to Build the Bomb, 1941-1942 Vannevar Bush moved swiftly to take advantage of the positive MAUD Report. Without waiting for Arthur Compton's latest committee to finish its work confirming the MAUD Committee's conclusions, Bush on October 9, 1941, met with President Franklin D. Roosevelt and Vice President Henry A. Wallace (who had been briefed on uranium research in July). Bush summarized the British findings, discussed cost and duration of a bomb project, and emphasized the uncertainty of the situation. He also received the President's permission to explore construction needs with the Army. Roosevelt instructed him to move as quickly as possible but not to go beyond research and development. Bush, then, was to find out if a bomb could be built and at what cost but not to proceed to the production stage without further presidential authorization. Roosevelt indicated that he could find a way to finance the project and asked Bush to draft a letter so that the British government could be approached "at the top.

285

GRR/Section 11-WA-a - State Cultural Considerations Overview | Open Energy  

Open Energy Info (EERE)

GRR/Section 11-WA-a - State Cultural Considerations Overview GRR/Section 11-WA-a - State Cultural Considerations Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 11-WA-a - State Cultural Considerations Overview 11-WA-a - State Cultural Considerations Overview.pdf Click to View Fullscreen Triggers None specified The developer will be required to comply with Washington state law when human remains or other cultural resources are discovered on a project site. Cultural resources include both historic and archaeological resources and sites. The discovery of cultural resources may require obtaining a permit and providing public notice and notice to Indian Tribes. Once the necessary procedures have been followed, the developer may continue with the project.

286

Two Line Subject Title One Line Title  

Broader source: Energy.gov (indexed) [DOE]

9 9 Status Update: EPAct 2005 Title IX, Subtitle J Section 999 - Project NT42677, "Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Program Roy Long Technology Manager, EPAct 2005 Title IX, Subtitle J, Section 999 2 UDAC Update Presentation Outline * Consortium Accomplishments * UDW Program RFP Summary - 2007 - 2008 * 2009 Funding Disbursement History * 2009 Program / Process Enhancements - Contractual / GAO - Risk Mitigation / Management 3 Overall: * 3 Annual Plans completed * 15 solicitations released under 2007 R&D funding * 43 projects selected for award under 2007 solicitations - 17 Ultra-Deepwater projects - 19 Unconventional Resources projects - 7 Small Producers projects Program Accomplishments Solicitations & Awards 4 * Current Status:

287

RAPID/Roadmap/11-WA-a | Open Energy Information  

Open Energy Info (EERE)

Toolkit About Bulk Transmission Geothermal Solar Tools Contribute Contact Us 11-WA-a State Cultural Considerations Overview 11-WA-a - State Cultural Considerations Overview.pdf...

288

GRR/Section 11-WA-c - Archaeological Resource Discovery Process | Open  

Open Energy Info (EERE)

GRR/Section 11-WA-c - Archaeological Resource Discovery Process GRR/Section 11-WA-c - Archaeological Resource Discovery Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 11-WA-c - Archaeological Resource Discovery Process 11-WA-c - Archaeological Resource Discovery Process.pdf Click to View Fullscreen Triggers None specified In the state of Washington, cultural resource concerns are integrated as early as possible into the planning for capital projects and are protected if discovered during construction. Washington defines "Cultural resources" as archeological and historical sites and artifacts, and traditional areas or items of religious, ceremonial and social uses to affected tribes. Washington defines an "Archaeological resource" as any

289

Project Title:__________________________________________________________________ Proposal #: _____________  

E-Print Network [OSTI]

#: _____________ Company Name: Name on Card: Mailing Address: Email: Telephone: FAX: Credit Card Type: Credit Card #, and the funding expiration date. NanoFab Payment Form Dollar Amount: Exp. Date mm/yy Credit Card Payment Purchase) contact name; 2) email; 3) fax; 4) telephone; 5) company name; 6) company mailing address; 7) Tax

290

WA_1995_009_AIR_PRODUCTS_AND_CHEMICALS_INC_Waiver_of_Domesti...  

Broader source: Energy.gov (indexed) [DOE]

9AIRPRODUCTSANDCHEMICALSINCWaiverofDomesti.pdf WA1995009AIRPRODUCTSANDCHEMICALSINCWaiverofDomesti.pdf WA1995009AIRPRODUCTSANDCHEMICALSINCWaiverofDomesti...

291

WA_96_016_AIR_PRODUCTS_AND_CHEMICALS_INC_Waiver_of_Domestic_...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

16AIRPRODUCTSANDCHEMICALSINCWaiverofDomestic.pdf WA96016AIRPRODUCTSANDCHEMICALSINCWaiverofDomestic.pdf WA96016AIRPRODUCTSANDCHEMICALSINCWaiverofDomest...

292

WA_1995_014_AIR_PRODUCTS_AND_CHEMICALS_INC_Waiver_of_Domesti...  

Broader source: Energy.gov (indexed) [DOE]

14AIRPRODUCTSANDCHEMICALSINCWaiverofDomesti.pdf WA1995014AIRPRODUCTSANDCHEMICALSINCWaiverofDomesti.pdf WA1995014AIRPRODUCTSANDCHEMICALSINCWaiverofDomest...

293

WA_1994_034_AIR_PRODUCTS_AND_CHEMICALS_INC_Waiver_of_Domesti...  

Broader source: Energy.gov (indexed) [DOE]

4034AIRPRODUCTSANDCHEMICALSINCWaiverofDomesti.pdf WA1994034AIRPRODUCTSANDCHEMICALSINCWaiverofDomesti.pdf WA1994034AIRPRODUCTSANDCHEMICALSINCWaiverofDom...

294

WA_99_017_AIR_PRODUCTS_AND_CHEMICALS_Waiver_of_Domestic_and_...  

Broader source: Energy.gov (indexed) [DOE]

9017AIRPRODUCTSANDCHEMICALSWaiverofDomesticand.pdf WA99017AIRPRODUCTSANDCHEMICALSWaiverofDomesticand.pdf WA99017AIRPRODUCTSANDCHEMICALSWaiverofDomesti...

295

WA_04_028_AIR_PRODUCTS_AND_CHEMICALS_Waiver_of_patent_Rights...  

Broader source: Energy.gov (indexed) [DOE]

8AIRPRODUCTSANDCHEMICALSWaiverofpatentRights.pdf WA04028AIRPRODUCTSANDCHEMICALSWaiverofpatentRights.pdf WA04028AIRPRODUCTSANDCHEMICALSWaiverofpatentRigh...

296

WA_1993_028_ALLIANCE_ELECTRIC_COMPANY_Waiver_of_Domestic_and...  

Broader source: Energy.gov (indexed) [DOE]

3028ALLIANCEELECTRICCOMPANYWaiverofDomesticand.pdf WA1993028ALLIANCEELECTRICCOMPANYWaiverofDomesticand.pdf WA1993028ALLIANCEELECTRICCOMPANYWaiverofDomestic...

297

WA_98_006_WESTINGHOUSE_POWER_GENERATION_A_FORMER_DIVISION_OF...  

Broader source: Energy.gov (indexed) [DOE]

6WESTINGHOUSEPOWERGENERATIONAFORMERDIVISIONOF.pdf WA98006WESTINGHOUSEPOWERGENERATIONAFORMERDIVISIONOF.pdf WA98006WESTINGHOUSEPOWERGENERATIONAFORMERDIVISION...

298

WA_98_005_WESTINGHOUSE_POWER_GENERATION_A_FORMER_DIVISION_OF...  

Broader source: Energy.gov (indexed) [DOE]

5WESTINGHOUSEPOWERGENERATIONAFORMERDIVISIONOF.pdf WA98005WESTINGHOUSEPOWERGENERATIONAFORMERDIVISIONOF.pdf WA98005WESTINGHOUSEPOWERGENERATIONAFORMERDIVISION...

299

U.S. DEPARTlVIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERrvIINATION  

Broader source: Energy.gov (indexed) [DOE]

DETERrvIINATION DETERrvIINATION RECIPIENT:WA Dept. of Commerce STATE: WA PROJECT SEP ARRA SIRTI - Greenwood -Scaling Production of Clean , High-Efficiecny, EPA Phase 2 Biomass TITLE: Boilers in WA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-FOA-0000052 DE-EE-0000139 GFO-0000139-032 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4Sl.IA), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies

300

Microfabrication Project Proposal Form Principle Investigator: (Person responsible for project)  

E-Print Network [OSTI]

Microfabrication Project Proposal Form Principle Investigator: (Person responsible for project: ___________________________________ Department: _____________________ _________________ __ Phone Number: _________________________ Project Information: Project Title: ________________________________________________________________ Funding Agency

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

ADVANCED RESEARCH PROJECTS AGENCY - ENERGY ...  

Office of Environmental Management (EM)

WA (DOEEIS-0467) FOSSIL ENERGY 13. Hydrogen Energy California's Integrated Gasification Combined Cycle Project, CA (DOEEIS-0431) NATIONAL NUCLEAR SECURITY ADMINISTRATION 14....

302

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

303

U.S. DEPARTlIIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlIIINATION  

Broader source: Energy.gov (indexed) [DOE]

DETERlIIINATION DETERlIIINATION RECIPIENT:WA Dept. of Commerce PROJECT TITl.E: Barr·Tech - Green waste to Renewable Energy Page I of2 STATE: WA Funding Opportunity Announcement Number PrOC'urtment Instrumcnt Number NEPA Control Number CID Number DE-FOA-OOOOO52 DE-EEOOOO139 GF0-09-155-011 0 Baud on my review oUbt information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.IA), I have made the foUowing detennination: ex, EA, EIS APPENDIX AND NUMBER: Description: 8 5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

304

U.S. Dl1PARl'MENT OF ENERGY EERE PROJECT MAN AG EMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

r-.u..~ r-.u..~ , U.S. Dl1PARl'MENT OF ENERGY EERE PROJECT MAN AG EMENT CENTER NEPA DEl'ElU.,nNAl'ION RECIPIENT:WA Dept. of Commerce PROJECT TITLE: Washington State Ferries Biodiesel Project· Phase II Page 1 of3 STATE: WA Funding Opportunity Announcement Number ProcuR'mentlnstrument Number NEPA Control Number em Number DE-FOA-OOOOO52 EEOOOO139 GF0-0000139-039 EE139 Based on my review orlhe Information concerning the propostd action, as NEPA Compliance Officer (authorized under DOE Order 45I.1A), I have made tbe rollowing determination: ex, EA, EIS APPENDIX AND NUMBER: Description: B5.22 Alternative fuel vehicle fueling stations The installation, modification, operation, and removal of alternative fuel vehicle fueling stations (such as for compressed

305

WA_98_016_ABB_POWER_T_AND_D_COMPANY_Waiver_of_Domestic_and_F...  

Broader source: Energy.gov (indexed) [DOE]

More Documents & Publications Advance Patent Waiver W(A)2011-046 Advance Patent Waiver W(A)2009-016 WA96016AIRPRODUCTSANDCHEMICALSINCWaiverofDomestic...

306

Advance Patent Waiver W(A)2009-030 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

public. Advance Patent Waiver W(A)2009-030 More Documents & Publications WA97030AIRPRODUCTSWaiverofDomesticandForeignPaten.pdf WA98001REYNOLDSMETALSCOMPANYW...

307

WA_04_085_THE_BOEING_COMPANY_Waiver_of_domestic_and_Foreign_...  

Broader source: Energy.gov (indexed) [DOE]

More Documents & Publications Advance Patent Waiver W(A)2010-018 Advance Patent Waiver W(A)2007-012 WA99017AIRPRODUCTSANDCHEMICALSWaiverofDomesticand...

308

WA_00_025_PRAXAIR_INC_Waiver_Request.pdf | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

25PRAXAIRINCWaiverRequest.pdf WA00025PRAXAIRINCWaiverRequest.pdf WA00025PRAXAIRINCWaiverRequest.pdf More Documents & Publications WA00001PRAXAIRINCWaiverofDo...

309

WA_00_035_ALCOA_INC_Waiver_of_Domestic_and_Foreign_Rights_in...  

Broader source: Energy.gov (indexed) [DOE]

& Publications WA03054HEILTRAILERINTERNATIONALWaiverofDomesticand.pdf WA00011HONEYWELLINTERNATIONALWaiverofDomesticandFor.pdf Advance Patent Waiver W(A)2010-051...

310

WA_03_054_HEIL_TRAILER_INTERNATIONAL_Waiver_of_Domestic_and_...  

Broader source: Energy.gov (indexed) [DOE]

& Publications WA00035ALCOAINCWaiverofDomesticandForeignRightsin.pdf WA00011HONEYWELLINTERNATIONALWaiverofDomesticandFor.pdf Advance Patent Waiver W(A)2010-051...

311

Ferndale High School Wind Project | Open Energy Information  

Open Energy Info (EERE)

Ferndale High School Wind Project Ferndale High School Wind Project Jump to: navigation, search Name Ferndale High School Wind Project Facility Ferndale High School Sector Wind energy Facility Type Community Wind Location WA Coordinates 48.852478°, -122.592613° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.852478,"lon":-122.592613,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

312

RAPID/Roadmap/4-WA-a | Open Energy Information  

Open Energy Info (EERE)

4-WA-a State Exploration Process 4-WA-a State Exploration Process.pdf Click to View Fullscreen Permit Overview Developers desiring to conduct geothermal exploration activities on...

313

RAPID/Roadmap/3-WA-b | Open Energy Information  

Open Energy Info (EERE)

needs access to state lands for exploratory purposes, then they should begin the State Exploration Process. Green arrow.PNG 4-WA-a: State Exploration Process 3-WA-b.3 to...

314

RAPID/Roadmap/19-WA-f | Open Energy Information  

Open Energy Info (EERE)

9-WA-f Water Well NOI for Replacement or Additional Wells 19-WA-f - Water Well NOI for Replacement or Additional Wells.pdf Click to View Fullscreen Permit Overview A developer...

315

W(A)94-022 STATEMENT OF CONSIDERATIONS  

Broader source: Energy.gov (indexed) [DOE]

4-022 4-022 STATEMENT OF CONSIDERATIONS Request by Cummins Power Generation, Inc., for an Advance Waiver of Domestic and Foreign Patent Rights to Inventions made under a contract entitled "Utility Scale Joint Venture Project," between Cummins Power Generation, Inc. and Sandia National Laboratories (Contract No. AB- 8717B) under Management and Operations Contract DE-AL04-84AL85000, DOE Docket No. W(A)94-022. The petitioner, Cummins Power Generation, Inc., (CPG) has requested a waiver of all domestic and foreign patent rights to inventions which it may conceive or first actually reduce to practice in the course of work under the Utility Scale Joint Venture Project between Petitioner and Sandia National Laboratories (Sandia) under contract No. AB- 8717B. Sandia is operated by Sandia Corporation for the U.S. Department of Energy (DOE).

316

EA-1912: Midway-Benton No. 1 Rebuild Project, near town of Desert...  

Broader source: Energy.gov (indexed) [DOE]

Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA EA-1912: Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA...

317

Syllabus Fall 2014 | APS 1019 Leadership in Project Management | Dr. Haig Baronikian 1 A) Title: APS1019 Leadership in Project Management  

E-Print Network [OSTI]

people and managing resources to achieve the intended project outcomes and benefits. Leadership is often, Strategy and Project Management Vision, Mission and Values! Strategic Planning and the Balanced Scorecard and Project Management 2 Organizational Culture Organizational Culture plays one of the largest roles

Prodiæ, Aleksandar

318

GRR/Section 11-WA-b - Human Remains Process | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 11-WA-b - Human Remains Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 11-WA-b - Human Remains Process 11-WA-b - Human Remains Process (1).pdf Click to View Fullscreen Triggers None specified This flowchart illustrates the necessary procedure when a developer discovers human remains on a project site. In Washington, every person has the duty to notify the coroner upon the discovery of any human remains in the most expeditious manner possible. The Washington Department of Archaeology and Historic Preservation (DAHP) handles the disposition of non-forensic remains, while the county coroner handles the disposition of

319

Category Capstone Project Title Student Names Bioengineering & Medical Devices A Point-of-Care Platform for Neonatal Complete Blood Counts  

E-Print Network [OSTI]

Project Peter Florin, Byron Pakter, Eric Scott, Brian Mick Product Design Concussion Terminator : Football Helmet Design, Analysis, Economics Meyssane Alj Hakim, Bruce Lin, Michael Liou Product Design Alo

Sekhon, Jasjeet S.

320

Advance Patent Waiver W(A)2011-011 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

W(A)2011-011 More Documents & Publications Advance Patent Waiver W(A)2008-011 Advance Patent Waiver W(A)2008-045 WA07038POETPROJECTLIBERTYLLCWaiverofDomesticandFo...

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Advance Patent Waiver W(A)2005-006 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

W(A)2005-006 More Documents & Publications Advance Patent Waiver W(A)2008-022 WA04079PRAXAIRINCWaiverofPatentRightsUnderaSubcon.pdf Advance Patent Waiver W(A)2011-063...

322

Advance Patent Waiver W(A)2002-023 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-023 Advance Patent Waiver W(A)2002-023 Advance Patent Waiver W(A)2002-023 More Documents & Publications Advance Patent Waiver W(A)2006-028 WA05056IBMWATSONRESEARCHCENTERWa...

323

National Ignition Facility Title II Design Plan  

SciTech Connect (OSTI)

This National Ignition Facility (NIF) Title II Design Plan defines the work to be performed by the NIF Project Team between November 1996, when the U.S. Department of Energy (DOE) reviewed Title I design and authorized the initiation of Title H design and specific long-lead procurements, and September 1998, when Title 11 design will be completed.

Kumpan, S

1997-03-01T23:59:59.000Z

324

WA_-01_001_PHILLIPS_PETROLEUM_Waiver_of_Domestic_and_Foreign...  

Broader source: Energy.gov (indexed) [DOE]

-01001PHILLIPSPETROLEUMWaiverofDomesticandForeign.pdf WA-01001PHILLIPSPETROLEUMWaiverofDomesticandForeign.pdf WA-01001PHILLIPSPETROLEUMWaiverofDomesticand...

325

WA_1993_041_ROCKETDYNE_AND_LLNL_Waiver_of_the_Governments_U.pdf...  

Broader source: Energy.gov (indexed) [DOE]

1ROCKETDYNEANDLLNLWaiveroftheGovernmentsU.pdf WA1993041ROCKETDYNEANDLLNLWaiveroftheGovernmentsU.pdf WA1993041ROCKETDYNEANDLLNLWaiveroftheGovernmentsU.pd...

326

WA_1993_042_UNITED_TECHNOLOGIES_CORPORATION_Waiver_of_the_Go...  

Broader source: Energy.gov (indexed) [DOE]

TIONWaiveroftheGo.pdf More Documents & Publications WA1993040REGENTSOFTHEUNIVERSITYOFCALIFORNIAWaivero.pdf WA1993041ROCKETDYNEANDLLNLWaiveroftheGovernmentsU...

327

WA_99_015_FORD_MOTOR_COMPANY_Waiver_of_Domestic_and_Foreign_...  

Broader source: Energy.gov (indexed) [DOE]

COMPANYWaiverofDomesticandForeign.pdf More Documents & Publications WA97038FORDMOTORCOMPANYWaiverofDomesticandForeign.pdf WA98008GENERALELECTRICCOMPANYWaive...

328

WA_99_022_AIR_PRODUCTS_AND_CHEMICAL_Waiver_of_Domestic_and_F...  

Broader source: Energy.gov (indexed) [DOE]

9022AIRPRODUCTSANDCHEMICALWaiverofDomesticandF.pdf WA99022AIRPRODUCTSANDCHEMICALWaiverofDomesticandF.pdf WA99022AIRPRODUCTSANDCHEMICALWaiverofDomestic...

329

WA_02_015_AIR_PRODUCTS_AND_CHEMICALS_INC_Waiver_of_Patent_Ri...  

Broader source: Energy.gov (indexed) [DOE]

15AIRPRODUCTSANDCHEMICALSINCWaiverofPatentRi.pdf WA02015AIRPRODUCTSANDCHEMICALSINCWaiverofPatentRi.pdf WA02015AIRPRODUCTSANDCHEMICALSINCWaiverofPatent...

330

WA_04_063_AIR_PRODUCTS_AND_CHEMICALS_Waiver_of_Patent_Rights...  

Broader source: Energy.gov (indexed) [DOE]

63AIRPRODUCTSANDCHEMICALSWaiverofPatentRights.pdf WA04063AIRPRODUCTSANDCHEMICALSWaiverofPatentRights.pdf WA04063AIRPRODUCTSANDCHEMICALSWaiverofPatentRig...

331

WA_04_083_AIR_PRODUCTS_AND_CHEMICALS_Waiver_of_Patent_Rights...  

Broader source: Energy.gov (indexed) [DOE]

83AIRPRODUCTSANDCHEMICALSWaiverofPatentRights.pdf WA04083AIRPRODUCTSANDCHEMICALSWaiverofPatentRights.pdf WA04083AIRPRODUCTSANDCHEMICALSWaiverofPatentRig...

332

WA_01_005__PRAXAIR_INC_Waiver_of_Domestic_and_Foreign_patent...  

Broader source: Energy.gov (indexed) [DOE]

1005PRAXAIRINCWaiverofDomesticandForeignpatent.pdf WA01005PRAXAIRINCWaiverofDomesticandForeignpatent.pdf WA01005PRAXAIRINCWaiverofDomesticandForeign...

333

WA_01_022_PRAXAIR_INC_AND_BP_AMOCO_Waiver_of_Domestic_and_Fo...  

Broader source: Energy.gov (indexed) [DOE]

1022PRAXAIRINCANDBPAMOCOWaiverofDomesticandFo.pdf WA01022PRAXAIRINCANDBPAMOCOWaiverofDomesticandFo.pdf WA01022PRAXAIRINCANDBPAMOCOWaiverofDomestic...

334

WA_03_018_HONEYWELL_INTERNATIONAL_Waiver_of_Domestic_and_For...  

Broader source: Energy.gov (indexed) [DOE]

3018HONEYWELLINTERNATIONALWaiverofDomesticandFor.pdf WA03018HONEYWELLINTERNATIONALWaiverofDomesticandFor.pdf WA03018HONEYWELLINTERNATIONALWaiverofDomestica...

335

WA_02_028_TRANE_CO__Waiver_of_Domestic_and_Foreign_Rights_in...  

Broader source: Energy.gov (indexed) [DOE]

5YORKINTERNATIONALCORPORATIONWaiverofDomesti.pdf WA01034INGERSOLL-RANDENERGYSYSTEMSWaiverofDomestica.pdf WA01011HONEYWELLLABORATORIESWaiverofDomesticandFore...

336

WA_04_040_HONEYWELL_INTERNATIONAL_INC_Waiver_of_Patent_Right...  

Broader source: Energy.gov (indexed) [DOE]

40HONEYWELLINTERNATIONALINCWaiverofPatentRight.pdf WA04040HONEYWELLINTERNATIONALINCWaiverofPatentRight.pdf WA04040HONEYWELLINTERNATIONALINCWaiverofPatentRi...

337

WA_03_041_HONEYWELL_INTERNATIONAL_Waiver_of_Domestic_and_For...  

Broader source: Energy.gov (indexed) [DOE]

3041HONEYWELLINTERNATIONALWaiverofDomesticandFor.pdf WA03041HONEYWELLINTERNATIONALWaiverofDomesticandFor.pdf WA03041HONEYWELLINTERNATIONALWaiverofDomestica...

338

WA_01_011_HONEYWELL_LABORATORIES_Waiver_of_Domestic_and_Fore...  

Broader source: Energy.gov (indexed) [DOE]

11HONEYWELLLABORATORIESWaiverofDomesticandFore.pdf WA01011HONEYWELLLABORATORIESWaiverofDomesticandFore.pdf WA01011HONEYWELLLABORATORIESWaiverofDomesticandF...

339

WA_00_011_HONEYWELL_INTERNATIONAL_Waiver_of_Domestic_and_For...  

Broader source: Energy.gov (indexed) [DOE]

0011HONEYWELLINTERNATIONALWaiverofDomesticandFor.pdf WA00011HONEYWELLINTERNATIONALWaiverofDomesticandFor.pdf WA00011HONEYWELLINTERNATIONALWaiverofDomestica...

340

WA_00_010_ROCKWELL_SCIENCE_CENTER_A_Subcontractor_of_SILICON...  

Broader source: Energy.gov (indexed) [DOE]

NTERASubcontractorofSILICON.pdf More Documents & Publications WA03011ROCKWELLAUTOMATIONWaiverofPatentRightsUnder.pdf WA01034INGERSOLL-RANDENERGYSYSTEMSWaiverof...

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

WA_04_034_NUVERA_FUEL_CELLS_INC_Waiver_of_Domestic_and_Forei...  

Broader source: Energy.gov (indexed) [DOE]

34NUVERAFUELCELLSINCWaiverofDomesticandForei.pdf WA04034NUVERAFUELCELLSINCWaiverofDomesticandForei.pdf WA04034NUVERAFUELCELLSINCWaiverofDomesticandFo...

342

WA_04_041_NUVERA_FUEL_CELLS_INC_Waiver_of_Domestic_and_Forei...  

Broader source: Energy.gov (indexed) [DOE]

41NUVERAFUELCELLSINCWaiverofDomesticandForei.pdf WA04041NUVERAFUELCELLSINCWaiverofDomesticandForei.pdf WA04041NUVERAFUELCELLSINCWaiverofDomesticandFo...

343

U.S. DEPARTlVIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlVIINATION  

Broader source: Energy.gov (indexed) [DOE]

ot3 ot3 U.S. DEPARTlVIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlVIINATION RECIPIENT:WA Dept. of Commerce STATE: WA PROJECT TITLE: SIRTI - Great Northern Spokane, LLC Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000052 DE-EE0000139 GFO-0000139-034 EE139 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.1A), 1 have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

344

u.s. Dl!PARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER Nl!PA DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

PARTMENT OF ENERGY PARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER Nl!PA DETERMINATION RECIPIENT:WA Dept of Commerce Page 1 of3 STATE: WA PROJECT TITLE: SEP ARRA · WSU Anaerobic Digester - Nutrient Recovery Technology - Vander Haak Dairy Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number EEOOOO139 GF0-0000139-040 0 Based on my review of the Information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.1A), I have made tbe following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering, analysis, and dissemination Information gathering (including, but not limited to, literature surveys, inventories, site visils, and audits), data analysis (including

345

DEPARTlVIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlVDNATION  

Broader source: Energy.gov (indexed) [DOE]

DEPARTlVIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlVDNATION RECIPIENT:WA Dept. of Commerce STATE: WA PROJECT SEP ARRA - SIRTI - NuElement Bio Aviation Fuel Battery-Extender Auxiliary Power Unit Demonstration TITLE: at Boeing Commercial Airplanes' System Concept Center Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000052 DE-EE-0000139 GFO-0000139-028 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not

346

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

347

Two Line Subject Title One Line Title  

Broader source: Energy.gov (indexed) [DOE]

UDAC Recommendations UDAC Recommendations Roy Long Technology Manager, EPAct 2005 Title IX, Subtitle J, Section 999 2 Overview of UDAC 2009 Recommendations Recommendation Areas * R&D Program Focus * Program Scope * Process * Program Progress & Value * Societal Impact 3 R&D Program Focus Area * Safety and environmental projects should be considered as separate topics. * Safety and environmental projects should be identified with specific phases of the exploration and production lifecycle. * The project impact assessment utilized in the project selection process should be made public and available to the UDAC. * Fund projects which address the overall safety impact of UDW activity. * Fund projects which address the overall environmental impact of UDW activity. * The metocean program should be strengthened regarding wind and

348

Cooperative fish rearing projects at Hanford  

SciTech Connect (OSTI)

This presentation details the success of the cooperative efforts to develop fish rearing projects at the Hanford Site, Richland,WA.

Betsch, M.D., Westinghouse Hanford

1996-06-25T23:59:59.000Z

349

W(A)93-013 STATEMENT OF CONSIDERATIONS  

Broader source: Energy.gov (indexed) [DOE]

13 13 STATEMENT OF CONSIDERATIONS Request by AlliedSignal, Inc. for Waiver of Domestic and Foreign Patent Rights to inventions that may arise under Contract No. DE-FC04-93AL94462 between the United States Department of Energy (DOE) and AlliedSignal, Inc. DOE Docket: W(A)93-013 The Petitioner, AlliedSignal, Inc. (AlliedSignal), has requested a waiver of all domestic and foreign patent rights to inventions which it may conceive or reduce to practice in the course of work under Contract No. DE-FC04-93AL94462, a Cooperative Agreement with DOE. The project period is May 14, 1993 through May 13, 1996. The Cooperative Agreement covers work in designing a biological/chemical production process for caprolactam using microbial bioprocesses that convert cyclohexane to

350

Lyle Falls Fish Passage Project Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Lyle Falls Fish Passage Project Lyle Falls Fish Passage Project Draft Environmental Impact Statement DOE/EIS-0397 March 2008 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Lyle Falls Fish Passage Project Draft Environmental Impact Statement (DOE/EIS-0397) Responsible Agencies: U.S. Department of Energy, Bonneville Power Administration (BPA); Confederated Tribes and Bands of the Yakama Nation (Yakama Nation); Washington Department of Fish and Wildlife (WDFW); U.S. Department of Agriculture, Forest Service (USFS), Title of Proposed Project: Lyle Falls Fish Passage Project State Involved: Washington (WA) Abstract: BPA proposes to fund modification of the existing Lyle Falls Fishway on the lower Klickitat River in

351

Grand Ridge Elementary Wind Project | Open Energy Information  

Open Energy Info (EERE)

Grand Ridge Elementary Wind Project Grand Ridge Elementary Wind Project Facility Grand Ridge Elementary Sector Wind energy Facility Type Community Wind Location WA Coordinates 47.545883°, -122.005714° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.545883,"lon":-122.005714,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

352

Grant Reference Grant Holder Research Organisation Project Title NE/I015299/1 Robert Upstill-Goddard Newcastle University Surfactant control of air-sea gas exchange in coastal waters  

E-Print Network [OSTI]

Grant Reference Grant Holder Research Organisation Project Title NE/I015299/1 Robert Upstill of Holocene Monsoon intensity from Central Asia NE/I016414/1 Michael James Lancaster University Quantifying's University of Belfast 14C as a tool to trace terrestrial carbon in a complex lake: implications for food

353

Lead Grant Reference Lead Grant RO Grant Holder Last Name, First Name Project Title NE/K000071/1 Newcastle University Mr R Gaulton Dual-wavelength laser scanning for forest health  

E-Print Network [OSTI]

Newcastle University Mr R Gaulton Dual-wavelength laser scanning for forest health monitoring. NE/K000381/1Lead Grant Reference Lead Grant RO Grant Holder Last Name, First Name Project Title NE/K000071/1 and sensory mechanisms in bat navigation NE/K000403/1 University of Southampton Dr S Watt Emplacement dynamics

354

Grant Reference Principal Investigator Research Organisation Project Title NE/J013544/1 Professor B Hubbard Aberystwyth University Extended-range optical televiewer imaging of the NEEM deep ice borehole, Greenland  

E-Print Network [OSTI]

Grant Reference Principal Investigator Research Organisation Project Title NE/J013544/1 Professor B Hubbard Aberystwyth University Extended-range optical televiewer imaging of the NEEM deep ice borehole/1 Dr A Bedford Edge Hill University Late Holocene temperature reconstruction from Hawes Water northwest

355

BayWa Sunways JV | Open Energy Information  

Open Energy Info (EERE)

Sunways JV Jump to: navigation, search Name: BayWa & Sunways JV Place: Germany Sector: Solar Product: Germany-based JV that specialises in developing, planning and realizing...

356

RAPID/Roadmap/14-WA-b | Open Energy Information  

Open Energy Info (EERE)

RAPID Regulatory and Permitting Information Desktop Toolkit BETA RAPID Toolkit About Bulk Transmission Geothermal Solar Tools Contribute Contact Us 14-WA-b NPDES Permit...

357

RAPID/Roadmap/9-WA-a | Open Energy Information  

Open Energy Info (EERE)

(EIS) is necessary. Contact Information Agency Washington State Department of Ecology Position State Environmental Issues Contact Name Fran Sant Email fran.sant@ecy.wa.gov...

358

Fourth Annual SECA Meeting - Seattle, WA  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fourth Annual SECA Meeting - Seattle, WA Fourth Annual SECA Meeting - Seattle, WA April 15-16, 2003 Table of Contents Disclaimer Papers and Presentations Expanded Applications of SECA Fuel Cells SECA Industrial Team Reports Military Applications of Fuel Cells Technology Highlights Environmental Considerations Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government or any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.

359

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Time: 2014-11-18 08:00:00 6456Proposal: NS-2014-6456-A PI: Paris Wiley Institution: Honeywell Corporation Title: Neutron Single Event Effects T... Start Time: 2014-11-19 08:00:00...

360

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

talks: 18 Presentation number Start time End time Presenter (if not author) First Author Remote Title Primary Task Force Area Alternate Task Force Area 101 9:30 9:37 Irby, Jim...

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ImageRotator.items href: 'javascript:void(0)', alt: 'Mule deer near cocooned reactor', title: 'Mule deer near cocooned reactor', image: src: 'http:www.hanford.govc.cfm...

362

--No Title--  

National Nuclear Security Administration (NNSA)

in Table 2.0. According to Title 40 CFR 61.93.(b)(4), (CFR 2002) no credit was taken for pollution control equipment in determining air emissions. The emissions for NESHAPs...

363

U.S. DEPARTlVIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlVIINATION  

Broader source: Energy.gov (indexed) [DOE]

State of Washington STATE: WA State of Washington STATE: WA PROJECT TITLE: SEP ARRA - GEN-X Energy Group, Inc. Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000052 EE0000139 GFO-0000139-033 EE139 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4Sl.IA), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: B1.7 Acquisition, installation, operation, and removal of communication systems, data processing equipment, and similar electronic equipment. B5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances

364

waTer economics. environmenTand Policy  

E-Print Network [OSTI]

41 cenTre for waTer economics. environmenTand Policy "Men and nature must work hand in hand and public policy insights for the supply, demand, management, and governance of water CWEEP pronounced `sweep' as in to survey so as to obtain a whole and continuous view of the world #12;42 waTer is a cri

Botea, Adi

365

Hanford, WA Selected as Plutonium Production Facility | National Nuclear  

National Nuclear Security Administration (NNSA)

Hanford, WA Selected as Plutonium Production Facility | National Nuclear Hanford, WA Selected as Plutonium Production Facility | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > Hanford, WA Selected as Plutonium Production Facility Hanford, WA Selected as Plutonium Production Facility January 16, 1943 Hanford, WA

366

EIS-0330: Wallula Power Project, Walla Walla County, WA  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's proposal to construct, operate, maintain, and decontaminate and decommission two depleted uranium hexafluoride (DUF 6) conversion facilities, at Portsmouth, Ohio, and Paducah, Kentucky.

367

Advance Patent Waiver W(A)2008-035 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

public. Advance Patent Waiver W(A)2008-035 More Documents & Publications WA07038POETPROJECTLIBERTYLLCWaiverofDomesticandFo.pdf Advance Patent Waiver W(A)2008-022...

368

Advance Patent Waiver W(A)2010-042 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Waiver W(A)2010-042 More Documents & Publications Advance Patent Waiver W(A)2005-023 WA02055PRAXAIRWaiverofDomesticandForeignPatentRigh.pdf ClassWaiverWC-2003-001.pdf...

369

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

370

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

371

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

372

Project Year Project Team  

E-Print Network [OSTI]

; Ian Sims, Student, Electrical and Computer Engineering, Whiting School of Engineering Project Title and Jazz Theory/Keyboard I & II. Technologies Used Digital Audio, Digital Video, Graphic Design, HTML

Gray, Jeffrey J.

373

Anemometer Data (Wind Speed, Direction) for Quinault #3, WA (2004 - 2005) |  

Open Energy Info (EERE)

Quinault #3, WA (2004 - 2005) Quinault #3, WA (2004 - 2005) Dataset Summary Description Wind data collected from Quinault Indian Reservation in Washington from an anemometer as part of the Native American anemometer loan program. Monthly mean wind speed is available for 2004 through 2005, as is wind direction and turbulence data. Data is reported from a height of 20 m. The data was originally made available by Wind Powering America, a DOE Office of Energy Efficiency & Renewable Energy (EERE) program. A dynamic map displaying all available data from DOE anemometer loan programs is available http://www.windpoweringamerica.gov/anemometerloans/projects.asp. Source EERE Date Released December 02nd, 2010 (4 years ago) Date Updated December 02nd, 2010 (4 years ago) Keywords wind

374

WA_00_008_PLUG_POWER_Waiver_of_Patent_Rights_in_Performance_...  

Broader source: Energy.gov (indexed) [DOE]

POWERWaiverofPatentRightsinPerformance.pdf More Documents & Publications WA99012AIRPRODUCTSWaiverofPatentRightsUnderANNVO.pdf WA99022AIRPRODUCTSANDCHEMICAL...

375

WA_99_012_AIR_PRODUCTS_Waiver_of_Patent_Rights_Under_AN_NVO_...  

Broader source: Energy.gov (indexed) [DOE]

2AIRPRODUCTSWaiverofPatentRightsUnderANNVO.pdf WA99012AIRPRODUCTSWaiverofPatentRightsUnderANNVO.pdf WA99012AIRPRODUCTSWaiverofPatentRightsUnderANNV...

376

WA_1994_027_FORD_MOTOR_COMPANY_Waiver_of_Domestic_and_Foreig...  

Broader source: Energy.gov (indexed) [DOE]

2FORDMOTORCOMPANYWaiverofDomesticandForeig.pdf WA97038FORDMOTORCOMPANYWaiverofDomesticandForeign.pdf WA99012AIRPRODUCTSWaiverofPatentRightsUnderANNVO...

377

WA_00_018_PRAXAIR_Waive_of_Domestic_and_Foreign_Invention_Ri...  

Broader source: Energy.gov (indexed) [DOE]

18PRAXAIRWaiveofDomesticandForeignInventionRi.pdf WA00018PRAXAIRWaiveofDomesticandForeignInventionRi.pdf WA00018PRAXAIRWaiveofDomesticandForeignInvention...

378

WA_02_046_QUESTA_AIR_TECHNOLOGIES_Waiver_of_Domestic_and_For...  

Broader source: Energy.gov (indexed) [DOE]

IRTECHNOLOGIESWaiverofDomesticandFor.pdf More Documents & Publications WA02055PRAXAIRWaiverofDomesticandForeignPatentRigh.pdf WA02021H2GENINNOVATIONSWaiverof...

379

WA_03_024_PRAXAIR_Waiver_of_Domestic_and_Foreign_Invention_R...  

Broader source: Energy.gov (indexed) [DOE]

24PRAXAIRWaiverofDomesticandForeignInventionR.pdf WA03024PRAXAIRWaiverofDomesticandForeignInventionR.pdf WA03024PRAXAIRWaiverofDomesticandForeignInventio...

380

WA_01_039_PRAXAIR_INC_Waiver_of_Domestic_and_Foreign_Patent_...  

Broader source: Energy.gov (indexed) [DOE]

1039PRAXAIRINCWaiverofDomesticandForeignPatent.pdf WA01039PRAXAIRINCWaiverofDomesticandForeignPatent.pdf WA01039PRAXAIRINCWaiverofDomesticandForeignP...

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

WA_02_055_PRAXAIR_Waiver_of_Domestic_and_Foreign_Patent_Righ...  

Broader source: Energy.gov (indexed) [DOE]

2055PRAXAIRWaiverofDomesticandForeignPatentRigh.pdf WA02055PRAXAIRWaiverofDomesticandForeignPatentRigh.pdf WA02055PRAXAIRWaiverofDomesticandForeignPaten...

382

WA_00_001_PRAXAIR_INC_Waiver_of_Domestic_and_Foreign_Inventi...  

Broader source: Energy.gov (indexed) [DOE]

01PRAXAIRINCWaiverofDomesticandForeignInventi.pdf WA00001PRAXAIRINCWaiverofDomesticandForeignInventi.pdf WA00001PRAXAIRINCWaiverofDomesticandForeignInve...

383

WA_04_079_PRAXAIR_INC_Waiver_of_Patent_Rights_Under_a_Subcon...  

Broader source: Energy.gov (indexed) [DOE]

04079PRAXAIRINCWaiverofPatentRightsUnderaSubcon.pdf WA04079PRAXAIRINCWaiverofPatentRightsUnderaSubcon.pdf WA04079PRAXAIRINCWaiverofPatentRightsUndera...

384

WA_02_022_HONEYWELL_INC_Waiver_of_Domestic_and_Foreign_Inven...  

Broader source: Energy.gov (indexed) [DOE]

22HONEYWELLINCWaiverofDomesticandForeignInven.pdf WA02022HONEYWELLINCWaiverofDomesticandForeignInven.pdf WA02022HONEYWELLINCWaiverofDomesticandForeignIn...

385

WA_02_045_KENNAMETAL_INC_Waiver_of_Domestic_and_Foreign_Righ...  

Broader source: Energy.gov (indexed) [DOE]

LINCWaiverofDomesticandForeignRigh.pdf More Documents & Publications WA00011HONEYWELLINTERNATIONALWaiverofDomesticandFor.pdf WA01034INGERSOLL-RANDENERGYSYSTEMS...

386

WA_04_039_HONEYWELL_INTERNATIONAL_Waiver_of_Patent_Rights_Un...  

Broader source: Energy.gov (indexed) [DOE]

9HONEYWELLINTERNATIONALWaiverofPatentRightsUn.pdf WA04039HONEYWELLINTERNATIONALWaiverofPatentRightsUn.pdf WA04039HONEYWELLINTERNATIONALWaiverofPatentRights...

387

WA_04_007_OSHKOSH_TRUCK_CORP_Waiver_of_Patent_Rights_Under_N...  

Broader source: Energy.gov (indexed) [DOE]

WaiverofPatentRightsUnderN.pdf More Documents & Publications WA03011ROCKWELLAUTOMATIONWaiverofPatentRightsUnder.pdf WA04008GENERALMOTORSCORPWaiverofPatentRi...

388

WA_03_011_ROCKWELL_AUTOMATION_Waiver_of_Patent_Rights_Under_...  

Broader source: Energy.gov (indexed) [DOE]

3011ROCKWELLAUTOMATIONWaiverofPatentRightsUnder.pdf WA03011ROCKWELLAUTOMATIONWaiverofPatentRightsUnder.pdf WA03011ROCKWELLAUTOMATIONWaiverofPatentRights...

389

Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Port Angeles-Juan de Fuca Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement DOE/EIS-0378 October 2007 Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement DOE/EIS - 0378 D e p a r t m e n t o f E n e r g y Office of Electricity Delivery and Energy Reliability and Bonneville Power Administration October 2007 Port Angeles-Juan de Fuca Transmission Project DOE/EIS-0378 Responsible Agency: U.S. Department of Energy (DOE): Office of Electricity Delivery and Energy Reliability (OE) and Bonneville Power Administration (BPA) Title of Proposed Project: Port Angeles-Juan de Fuca Transmission Project State Affected: Washington (WA) Abstract: Sea Breeze Olympic Converter LP (Sea Breeze) has applied to DOE for authorizations and approvals

390

Project Acronym AMOP Project title (in French)  

E-Print Network [OSTI]

-role on the evolution of climate (greenhouse gases production) and living resources from ecosystems to fisheries Industrial Research International cooperation International cooperation with: United States - MWN United and the worrying problem of the ocean deoxygenation due to global warming and human activities, OMZs have not been

391

TITLE PAGE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Title: Seismic and Rockphysics Diagnostics of Title: Seismic and Rockphysics Diagnostics of Multiscale Reservoir Textures Type of Report: Final Technical Reporting Start Date: April 1, 2005 Reporting End Date: June 30, 2005 Principal Investigator: Prof. Gary Mavko Date of Report: July 2005 DOE Award Number: DE-FC26-01BC15354 Submitting Organization: Stanford University, 651 Serra Street, Suite 260, Stanford, CA 94305-4125 1 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warrantee, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not

392

Isotopic Studies of Contaminant Transport at the Hanford Site, WA  

E-Print Network [OSTI]

MR-0132. Westinghouse Hanford Company, Richland WA. Bretz,in recharge at the Hanford Site. Northwest Science. 66:237-M.J. , ed. 2000. Hanford Site groundwater Monitoring

Christensen, J.N.; Conrad, M.E.; DePaolo, D.J.; Dresel, P.E.

2008-01-01T23:59:59.000Z

393

RAPID/Roadmap/18-WA-b | Open Energy Information  

Open Energy Info (EERE)

period in which the WSDE has to respond to the Demonstration of Compliance. 18-WA-b.17 - Conduct Public Meeting, if Requested If the public requests a public meeting on the...

394

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

TRU Pad 1 Inventory. This project will provide personnel weather shelters (shelters, Mobile Mini) for personnel supporting the ARRA in E-Area while new facilities are being...

395

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

The goal of the project is to reduce the City's energy intensity and costs, and lower GHG emissions. The Technical Energy Audit (TEA) will evaluate systems, equipment and...

396

Presentation title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Department of Energy initiated effort to develop renewable energy resources and reduce GHG emissions * Develop a high level "screening tool" to identify potential projects that...

397

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

and control rights usually and customarily provided to lenders in similar project finance transactions" allows DOE, within its sole discretion and in appropriate circumstances as...

398

Recent Titles  

E-Print Network [OSTI]

Kings River Project, CA-Fre- 1441, CA-Fre-1442, CA-Fre-1443 and CA- Fre-1444, Fresno County, California.

Moratto, Michael J

1984-01-01T23:59:59.000Z

399

--No Title--  

Energy Savers [EERE]

56 DATE: June 4, 2013, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management...

400

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

an energy efficiency strategy, retaining technical services, and upgrading the HVAC system for the County of Twin Falls. OCRWM Twin Fall County Energy Efficiency Projects...

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

Developing an energy efficiency strategy and upgrades for multiple HVAC systems for the city of Hobbs. OCRWM Hobbs Energy Efficiency Project New Mexico Apr 9, 2010 Kathryn Knapp...

402

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

retaining technical services, conducting audits, lighting retrofits, and potential HVAC upgrades for Miles City. OCRWM Miles City Energy Efficiency Projects Montana Apr 3,...

403

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

The tribe proposes to hire an individual and provide energy audit training to create an Energy Auditor position. The project will perform energy audits for local commercial and...

404

--No Title--  

Office of Legacy Management (LM)

March 21, 2014 Re: Instrumentation and Monitoring, Rocky Flats OLF Tt Project : 114-181750 Introduction This technical memorandum provides a summary and evaluation of data...

405

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

& Controls Simulation Engineering High Performance Materials Innovative Energy Concepts Water Management R&D University Research CCSI NRAP Program Plan Project Information...

406

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

a project led by Joseph Oefelein of Sandia National Laboratories will study the combustion processes of internal combustion engines, helping to make vehicles more efficient, thus...

407

--No Title--  

Energy Savers [EERE]

52 DATE: May 6, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management...

408

--No Title--  

National Nuclear Security Administration (NNSA)

NUCLEAR ENERGY UNIVERSITY PROGRAMS Improved Fission Neutron Data Base for Active Interrogation of Actinides PI: Pozzi, Sara - University of Michigan Project Number: 09-414...

409

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

joined Martin Marietta Energy Systems as project coordinator for the International Thermonuclear Experimental Reactor (ITER) engineering design activities. He became the U.S. ITER...

410

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

376-1297, DeeMillikin@rl.gov Three Fuel Storage Facilities Removed from Hanford's Landscape Completion of Recovery Act Project Reduces Cleanup Footprint RICHLAND, WASH. - Gone...

411

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

and pilot projects The proposed action would involve the purchase and installation of a solar panel system on the community washeteria, a public facility with rest rooms, showers...

412

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

Develop energy efficiency and conservation strategy, 2) technical consultant, 3) revolving loan program, 4) sub grants for commercial projects, 5) energy upgrades of city...

413

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

Strategy (EECS) focuses upon the following EECBG project activities: "Technical Consultant Services" and "Energy Efficiency Retrofits" as described by the EECBG Program....

414

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

Technical consultant, 2) revolving loan program, 3) sub grants for commercial projects, 4) energy upgrades of city facilities Energy Efficiency and Conservation Block Program Hire...

415

DEP.~TMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

DEP.~TMENT OF ENERGY DEP.~TMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DFTJ!R1,fiNATION RECIPIENT:Sound & Sea Technology. Inc. PROJECT TITLE: Marine and Hydrokinetic Technology Readiness Advancemenlinitiative Page I of2 STATE: WA Funding Opportunity Announcement Number Procurement Instrument Number N[PA Control Number CID Number DE-FOA-OOOO293 OE-EEOOO3632 GFO-OOO3632-OO1 GOO Based on my review oflhe informatioD concerning the proposed action,.s NEPA Compliance Officer (authorized under DOE Order 4SI.IA),1 have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, bul 1"101 limited to, literature surveys, inventories, audits), data analysis (including computer modeling). document preparation (such as conceptual design or feasibility studies, analytical energy supply

416

GEOL 5303 Project Presentations Presenter name: ______________________________________________  

E-Print Network [OSTI]

GEOL 5303 Project Presentations Presenter name: ______________________________________________ Project title: ___________________________________________________________ Project content Superb Effective Weak Absent Introduction: What is your project topic? Presenter provides a clear introduction

Smith-Konter, Bridget

417

Presentation Title  

Broader source: Energy.gov (indexed) [DOE]

Hawaii Sustainable Energy Project - Hawaii Sustainable Energy Project - NREL Support DOE OE Smart Grid Peer Review Ben Kroposki, PhD, PE November 2-4, 2010 Innovation for Our Energy Future Innovation for Our Energy Future Hawaii Sustainable Energy Project- NREL Objective Funding Summary ($K) FY09 FY10 FY11 300K 300K 300K Technical Scope Provide technical support to Hawaii to reach goal of 70% renewable and energy efficiency Provide technical support to Lanai (MECO and C&C) to help reach goal of 100% renewable energy. Provide Kauai and KIUC with technical support regarding integration of renewable energy. Provide technical support for Hawaii in the areas of grid integration of distributed and renewable energy and smart grid applications Innovation for Our Energy Future Needs and Challenges This project addresses the Smart

418

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BioCee's thin-film coating technology. Bio- hydrocarbons will be converted into fuels by chemical catalytic processes. Advanced Research Projects Agency - Energy (ARPA-E) 25A4083...

419

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

materials, 3) bike path extension (.5 miles), 4) expand recycling program, 5) install,o solar panels on city building-panels are to be used as a demonstration project to collect...

420

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

between supercomputers and the huge data available in molecular databases like the Human Genome Project," Baudry said. "We have an avalanche of data available to us, and now we...

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

Replacing an HVAC system for the city of West New York OCRWM West New York Energy Efficiency Projects New Jersey Apr 9, 2010 Kathryn Knapp Digitally signed by Kathryn Knapp DN:...

422

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

engineering that evolved from their work on a DOE project that focused on developing mobile robots to work in hazardous environments. The invention won an R&D 100 Award in...

423

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Math, Science and Technology Nov. 5 at Georgia Tech in Atlanta. Under the guidance of Boyd Evans and John Mueller, ORNL biomedical engineers, Cain and Liu developed a project...

424

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

New conductor could provide answers for energy demand OAK RIDGE, Tenn., Nov. 7, 2002 - Oak Ridge National Laboratory and 3M Company are hoping for powerful results from a project...

425

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Track 1A: Oil & Gas Production Track 1A: Oil & Gas Production and Utilization-Overview George Guthrie Office of Research and Development National Energy Technology Laboratory Title, Date ‹#› The Need: Energy portfolio is projected to remain anchored by fossil. Sources: U.S. data from EIA, Annual Energy Outlook 2011; World data from IEA, World Energy Outlook 2010, Current Policies Scenario 79% Fossil Energy 78% Fossil Energy 84% Fossil Energy 81% Fossil Energy * Primarily traditional biomass, wood, and waste. Gas 24% Coal 21% Oil 33% Nuclear 8% Renewables 14% Gas 24% Coal 22% Oil 37% Nuclear 8% Renewables 8% Gas 21% Coal 27% Oil 33% Nuclear 6% Renewables* 13% Gas 22% Coal 29% Oil 28% Nuclear 8% Renewables* 15% + 14% + 47% Energy Demand 2008 Energy Demand 2035 World

426

Recipient: County of Kitsap, WA ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM  

Broader source: Energy.gov (indexed) [DOE]

it: EE 000 0853 it: EE 000 0853 Recipient: County of Kitsap, WA ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM Activities Determination/ Categorical Exclusion Reviewer's Specific Instructions and Rationale (Restrictions and Allowable Activity) Kitsap Built Green Projects B5.1 Waste Stream, Engineering, and Historic Preservation clauses. Kitsap County Building Retrofits and Energy Efficiency Upgrades (Green Jobs Initiative) B5.1 except geothermal Waste Stream, Engineering, and Historic Preservation clauses. Prohibited: Any implementation of geothermal projects/construction activities without NEPA approval from DOE. Geothermal projects are to be provided to DOE for analysis. Energy Efficiency Implementation and Strategy A9, All, B5.1 None Energy Services Corps A9, All, B5.1

427

Presentation Title  

Broader source: Energy.gov (indexed) [DOE]

Mexico (PNM) - PV Plus Storage for Simultaneous Voltage Smoothing and Peak Shifting Steve Willard PE Principal Investigator November 3, 2010 Funded in part by the Energy Storage Systems Program of the U.S. Department Of Energy through National Energy Technology Laboratory PNM/DOE SGDP Battery + PV Objectives * Project will co-locate a 2 - 4 MWh Advanced Lead Acid battery with a separately installed 500kW solar PV plant at a utility-owned site to create a firm, dispatchable distributed generation resource. * The project will develop broadly applicable modeling tools. These tools are being developed and used during the project to optimize the battery-system control algorithms, and ultimately will help characterize and further the understanding of feeders with storage and distributed

428

u.s. DEPARTl'..IENT OF ENERGY EERE PROJECT MANAGEM ENT CEN T  

Broader source: Energy.gov (indexed) [DOE]

No.1 to conduct preliminary engineering analyses in support of a project to harness hydroelectric power from the Everett, WA Reservoir 4 water transmission line. The Snohomish...

429

Big Horn Wind Power Project | Open Energy Information  

Open Energy Info (EERE)

Wind Power Project Wind Power Project Jump to: navigation, search Name Big Horn Wind Power Project Facility Big Horn Wind Power Project Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Iberdrola Renewables Developer PPM Energy Inc Energy Purchaser Modesto-Santa Clara-Redding Public Power Agency Location Klickitat County WA Coordinates 45.935948°, -120.284085° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.935948,"lon":-120.284085,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

430

PRESENTATION TITLE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects Impacting Federal Projects Impacting Federal Power Tulsa District Dan Brueggenjohann 12 June 2013 BUILDING STRONG ®  Interpretation/Application of CERM-F-2013-18  303(d) Listing of Broken Bow Tailwaters  Interior Least Tern Operations and Habitat Creation  Tulsa Vision 2025  Dam Safety Issues ► Keystone, Pine Creek, Robert S. Kerr, Denison  Lake Eufaula Advisory Committee  Tenkiller Downstream Fishery Issues  Broken Bow Seasonal Pool Update - Cultural Resources Impacts  Arkansas River Navigation Improvement  Oklahoma Comprehensive Water Plan Update BUILDING STRONG ® Interpretation/Application of CERM-F-2013-18  Situation - New Resource Management regulation to increase the capitalization threshold for power marketing agency assets.

431

PRESENTATION TITLE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Southwestern Regional Southwestern Regional Hydropower Conference Michael Biggs, PE Chief, Reservoir Control Section Hydraulics & Technical Services Branch Little Rock District 16 June 2011 BUILDING STRONG ® White River Operations BUILDING STRONG ® Typical River Basin BUILDING STRONG ® Typical Multi Purpose Project BUILDING STRONG ® Typical River Section BUILDING STRONG ® Typical Regulating Station BUILDING STRONG ® White River Basin and Projects BUILDING STRONG ® White River System  Operated as a SYSTEM of reservoirs ► Beaver, Table Rock, Bull Shoals, Norfork are a 4-lake subsystem ► Greers Ferry ► Clearwater  "Comprehensive" system of water control regulation ► encompasses the entire White River basin ► 1 water control plan  Operation of the system is VERY COMPLEX

432

unknown title  

E-Print Network [OSTI]

AbstractThe problem of wastewater treatment in Egypt is a two-fold problem; the first part concerning the existing rural areas, the second one dealing with new industrial/domestic areas. In Egypt several agricultural projects have been initiated by the government and the private sector as well, in order to change its infrastructure. As a reliable energy source, photovoltaic pumping systems have contributed to supply water for local rural communities worldwide; they can also be implemented to solve the problem wastewater environment pollution. The solution of this problem can be categorised as recycle process. In addition, because of regional conditions past technologies are being reexamined to select a smallscale treatment system requiring low construction and maintenance costs. This paper gives the design guidelines of a Photovoltaic Small-Scale Wastewater Treatment Plant (PVSSWTP) based on technologies that can be transferred. KeywordsRenewable energy sources, Photovoltaic, small-scale projects, wastewater treatment. I I.

Photovoltaic Small-scale; Wastewater Treatment; Fadia M. A. Ghali

433

Gaseous Detonation-Driven Fracture of Tubes Tong Wa Chao  

E-Print Network [OSTI]

Gaseous Detonation-Driven Fracture of Tubes Thesis by Tong Wa Chao In Partial Fulfillment An experimental investigation of fracture response of aluminum 6061-T6 tubes under internal gaseous detonation on the detonation velocity, strain history, blast pressure from the crack opening, and crack speeds. The curved

434

DOE - Office of Legacy Management -- University of Washington - WA 0-01  

Office of Legacy Management (LM)

Washington - WA 0-01 Washington - WA 0-01 FUSRAP Considered Sites Site: UNIVERSITY OF WASHINGTON (WA.0-01) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Seattle , Washington WA.0-01-1 Evaluation Year: 1987 WA.0-01-1 Site Operations: Research activities involving small quantities of radioactive materials in a controlled environment. WA.0-01-1 Site Disposition: Eliminated - Potential for residual radioactive contamination considered remote - Operating under active NRC license WA.0-01-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: None Indicated WA.0-01-1 Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP Also see

435

PROJECT REQUEST FORM PROJECT HOLDER INFORMATION  

E-Print Network [OSTI]

PROJECT REQUEST FORM Last Name: Email: PROJECT HOLDER INFORMATION UCID:Last Name: Email: Institute if different than Project Holder) First Name: Project Short Name: (50 characters max) (for eFIN view only) Project Title: PROJECT INFORMATION Start Date (MM/DD/YYYY): End Date (MM/DD/YYYY): For Questions or HELP

de Leon, Alex R.

436

Presentation title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Meeting Transmission Meeting Transmission Challenges in the Rocky Mountain Region Jeff Hein June 21, 2011 Western Renewable Energy Zones Composite photo created by NREL Presentation Outline * WREZ Vision * Chronology * WREZ Initiative Overview * Generation and Transmission Model * Lessons Learned * Future Activities National Renewable Energy Laboratory WREZ Vision * Western Governor's Association and U.S. Department of Energy initiated effort to develop renewable energy resources and reduce GHG emissions * Develop a high level "screening tool" to identify potential projects that allows industry stakeholders to analyze and compare economics of

437

PRESENTATION TITLE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

STRONG STRONG ® Projects Impacting Federal Power Tulsa District Dan Brueggenjohann 9 June 2010 BUILDING STRONG ® 303(d) Listing of Broken Bow Tailwaters Impairment Impaired Use Cadmium Fish and Wildlife Propagation - Trout Fishery Lead Fish and Wildlife Propagation - Trout Fishery Water Temperature* Fish and Wildlife Propagation - Trout Fishery The 303(d) List reports on waters identified as impaired. These waters: Have elevated portions of one or more pollutants. Do not meet one or more water quality standards. Portions of the Mountain Fork River below Broken Bow Dam are on the 2010 draft Oklahoma 303(d) list. * ODWC is currently working to implement a selective withdrawal

438

SENIOR PROJECT APPROVAL FORM Submit this completed form with your Honors Senior Project  

E-Print Network [OSTI]

SENIOR PROJECT APPROVAL FORM Submit this completed form with your Honors Senior Project I. PERSONAL: _______________________________________ Classification: Junior Senior II. PROJECT INFORMATION Type of Project: Thesis Group Project Internship Creative Project Study Abroad Service Learning Project Title

Huang, Haiying

439

unknown title  

E-Print Network [OSTI]

THE GOAL OF PROJECT APOLLO, to place a man on the surfaceof the Moon and return him safely to Earth, was a task for engineering and technology. The resultant transportation system was so robust in its capability that a rich scientific harvest also was gathered in the process. The visibility and magnitude of the Apollo program left the impression, even within the scientific community,that the major lunar scientific questions had been answered. Since the Surveyor project, NASA's unmanned planetary program has ignored the Moon, preferring to concentrate its admittedly limited resources on other bodies in the solar system. In 1972,lunar scientists proposed launching a remote-sensing satellite into lunar polar orbit. Carrying a small number of geochemical and geophysical sensors,the Lunar Polar Orbiter (LBO)was designed to expand to global coverage the limited Apollo orbital science data set. Remote-sensing information from the orbiting Service Modules of Apollos 15, 16,and 17 had been invaluable in revealing the scale and extent of the planetary processes whose nature and timing were decoded in analyses of the returned samples. Low orbital inclination and limited time at the Moon resulted in tantalizingly

unknown authors

440

Title page  

Office of Legacy Management (LM)

Institutional Controls Evaluation (ICE) Report: Institutional Controls Evaluation (ICE) Report: Summary of Supporting Information for the Identification and Evaluation of Institutional Controls for the Weldon Spring Site September 2004 prepared by Environmental Assessment Division, Argonne National Laboratory prepared for U.S. Department of Energy, Office of Legacy Management, Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri, under Contract W-31-109-Eng-38 iii September 2004 CHECKLIST FOR INSTITUTIONAL CONTROL (IC) PACKAGE FOR THE WELDON SPRING SITE For identifying, evaluating, selecting the IC mechanisms for the Weldon Spring Site, the items in the checklist below are included in this report. ¥ 1. Provide maps and figures showing boundaries of the land use controls (Section 4 and

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Main Title  

Broader source: Energy.gov (indexed) [DOE]

50 State Street, Suite 3 50 State Street, Suite 3 Montpelier, VT 05602 Phone: 802-223-8199 web: www.raponline.org Roadmap 2050: A practical guide to a prosperous, low-carbon Europe A project of the European Climate Foundation Presentation to the U.S. Department of Energy Electricity Advisory Committee Michael Hogan, Senior Advisor, RAP 12 July 2011 Month dd, yyyy The objective was to develop a fact based report - supported by key stakeholders and feeding directly into EU decision making 2 Key deliverables ▪ A set of plausible and visionary emissions pathways with an 80% reduction across the EU-27 below 1990 levels by 2050 ▪ Deep dive on the decarbonization of the power sector ▪ Implications on strategic options for the EU ▪ A related set of policy options highlighting poten-

442

Leakage Risk Assessment of CO2 Transportation by Pipeline at the Illinois Basin Decatur Project, Decatur, Illinois  

E-Print Network [OSTI]

of CO 2 associated with carbon capture & storage projects:2 transportation for carbon capture and storage: sublimationin Gerard, W.A. , ed. , Carbon Capture and Sequestration

Mazzoldi, A.

2014-01-01T23:59:59.000Z

443

Project Year Project Team  

E-Print Network [OSTI]

information systems (GIS) tools to design maps that integrate data for visualizing geographic concepts School of Engineering Project Title GIS & Introductory Geography Audience Undergraduate students on how to use the Internet for geographic research, and an interactive introduction to GIS through online

Gray, Jeffrey J.

444

u.s. DEPARTl'dENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlVIINATION  

Broader source: Energy.gov (indexed) [DOE]

DEPARTl'dENT OF ENERGY DEPARTl'dENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlVIINATION RECIPIENT:King County PROJECT EECBG Replacement Projects TITLE: Page 1 of2 STATE: WA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE· FOA·0000013 DE· EE0000854.002 EEO Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

445

PMC·En. u.s. DEPARTMENT OE ENERGY EERE PROJECT MANAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

En. En. u.s. DEPARTMENT OE ENERGY EERE PROJECT MANAGEMENT CENTER NEPADETERMINATION RECIPIENT:Washington Department of Commerce PROJECT TITLE: Elma City Halt, Fire Station & Police Station - EECBG Page I of2 STATE : WA Funding Opportunity Announcement Number DE-FOA-OOOOO13 Procurement Instrument Number DE-EEOOO0849 NEPA Control Number em Number EEO Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4Sl.IA), I have made the (ollowing determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency thai do not increase the indoor ooncenlralions of potentially harmful substances. These actions may involve financial and technical

446

U.S. DEPARTMENT OFllNERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

OFllNERGY OFllNERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT:Washington Department of Commerce Page 1 of2 STATE: WA PROJECT TITLE: Kittitas County, Washington Morris Sorensen Bldg. & Upper County Shop· EECBG State of Washington Funding Opportunity Announcement Number Procuremenllnslrument Number DE-EE0000849 NEPA Control Number em Number EEO Based on my review orlhe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A),1 have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 81.3 Routine maintenance activities and custodial services for buildings, structures, rights-of-way, infrastructures (e.g ., pathways. roads, and railroads ). vehicles and equipment. and localized vegetation and pest control. during which

447

u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

Washington Department of Commerce Washington Department of Commerce PROJECT TITLE: Washington Cowlitz County partnership Project - EECBG State of Washington Page 1 of3 STATE: WA Funding Opportunity Announcement Number DE-FOA-OOOOO13 Procurement Instrument Number DE-EEOOOO849 NEPA Control Number em Number EEO Based on my review oflhe information conc:erning the proposed action, as NEPA Compliance Officer (authorized under DOE Onter 451.1A). I have made the following detumination: ex, EA, EIS APPENDIX AND NUMBER: Description: 8 5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency thai do not increase the Indoor concentrations of potentially harmful substances. These actions may involve finanCial and techmcal 3SSlStance to Individuals (such as builders, owners, consultants, designers), organizations (sud'! as utilities), and state

448

U.S. DEPARTlVIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

A1I.oJ) A1I.oJ) U.S. DEPARTlVIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT:City of Seattle, Seattle City Ught PROJECT TITLE : Community Solar Financing Through Municipal Utility Page 1 of2 STATE: WA Funding Opportunity Announcement Number- Pro<:urement Instrument Number NEPA Control Number CID Number DE-FOA-QOOOO78 EEOOO2077 9f0-0002077-OO2 0 Based on my ffY iew oftbc information coourning tbe proposed action, as NEPA Compliance Officer (authorized uDder OOE Order 451.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: l.>cscription: 8 5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-effiCiency that do not increase the Indoor concentrations of potentially harmful substances These actioo5 may involve financial and technical

449

PNIC- F. F2 a U.S. DEPARTMENT OF ENERGY HERE PROJECT MANAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

wei wei r PNIC- F. F2 a U.S. DEPARTMENT OF ENERGY HERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT:Snohomish County PUD STATE: WA PROJECT TITLE : Snohomish County PUD Geothermal Energy Study Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number CDP DE-EE000325 GFO-09-326 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to. literature surveys. inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and

450

File:INL-geothermal-wa.pdf | Open Energy Information  

Open Energy Info (EERE)

wa.pdf wa.pdf Jump to: navigation, search File File history File usage Washington Geothermal Resources Size of this preview: 699 × 600 pixels. Full resolution ‎(4,835 × 4,147 pixels, file size: 3.28 MB, MIME type: application/pdf) Description Washington Geothermal Resources Sources Idaho National Laboratory Authors Patrick Laney; Julie Brizzee Related Technologies Geothermal Creation Date 2003-11-01 Extent State Countries United States UN Region Northern America States Washington File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:45, 16 December 2010 Thumbnail for version as of 12:45, 16 December 2010 4,835 × 4,147 (3.28 MB) MapBot (Talk | contribs) Automated upload from NREL's "mapsearch" data

451

GRR/Section 15-WA-a - Air Quality Notice of Construction Permit | Open  

Open Energy Info (EERE)

5-WA-a - Air Quality Notice of Construction Permit 5-WA-a - Air Quality Notice of Construction Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-WA-a - Air Quality Notice of Construction Permit 15-WA-a - Air Quality Notice of Construction Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies WAC 173-400-110 WAC 173-400-111 WAC 173-400-171 Triggers None specified This flowchart illustrates the process for obtaining an Air Quality Notice of Construction Permit. The Washington State Department of Ecology (WSDE) oversees the permitting process under WAC 173-400. 15-WA-a - Air Quality Notice of Construction Permit.pdf 15-WA-a - Air Quality Notice of Construction Permit.pdf 15-WA-a - Air Quality Notice of Construction Permit.pdf

452

Title Standards 2001  

Broader source: Energy.gov (indexed) [DOE]

Standards 2001 Standards 2001 A guide for the preparation of title evidence in land acquisitions by the United States of America. Quick links to Contents: Table of Contents / Why Title Standards 2001, and who uses it? / Evidence of title / Abstract of Title Supplemental and Supporting Title Evidence / Title Insurance Policies and Certificates of Title / Final Title Evidence Title Evidence for Condemnations / The Deed to the United States / Special Standards for Texas / Sample Forms U.S. Department of Justice Environment and Natural Resources Division Land Acquisition Section Washington, D.C. 20530 December 29, 2000 (reprint March 23, 2001) [Editor's Note: The reprint of March 23, 2001, added page numbers to the table of contents; added a new item "3" to part B of Form # 1 of the Certificate of Inspection and Possession,

453

York Externally Funded Research Grants and Contracts -July 1, 2009 to December 31, 2009 Rersearcher Project Title Funder Total Funding Start Date End Date  

E-Print Network [OSTI]

of Spatial Framework to Enhance Chronic Disease Surveillance Public Health Agency of Canada $102,936 10 for an Energy Efficient Ontario SeeLine Group LTD. $10,000 11/1/2009 4/30/2010 Bebko, James Mentoring Project Conservation Authority $5,000 12/22/2009 12/31/2010 Bohr, Yvonne Parent-Infant Separation in Trans- national

454

York Externally Funded Research Grants and Contracts -January 1, 2010 to June 30, 2010 Rersearcher Project Title Funder Total Funding Start Date End Date  

E-Print Network [OSTI]

to Low Income Households and an Assessment of Their Debt Relief Options SSHRC $67,029 4/1/2010 3, Uzoamaka N Black Creek Community Capacity Building Project Delta Family Resource Centre $25,284 1 Playing Field Understanding Relative Age Effects in Sport SSHRC $100,563 4/1/2010 3/31/2013 Page 1 of 20

455

GRR/Section 9-WA-b - State Environmental Review | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 9-WA-b - State Environmental Review GRR/Section 9-WA-b - State Environmental Review < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 9-WA-b - State Environmental Review 9-WA-b - State Environmental Review.pdf Click to View Fullscreen Triggers None specified Once the lead agency is determined they are responsible for continuing forward with environmental review. In Washington, environmental review is effectuated through the developer completing an Environmental Checklist which assists the lead agency in determining whether the proposal will likely result in negative impacts on the environment. 9-WA-b - State Environmental Review.pdf 9-WA-b - State Environmental Review.pdf Error creating thumbnail: Page number not in range.

456

RECIPI ENT;Kitsap County u.s. DEPARTlvIENT OF ENER GY EERE PROJECT MANAGEMENT CENT  

Broader source: Energy.gov (indexed) [DOE]

ENT;Kitsap County ENT;Kitsap County u.s. DEPARTlvIENT OF ENER GY EERE PROJECT MANAGEMENT CENT ER NEPA DETERlVITNATION PROJECT TITLE: EECBG * Energy Service Corps (SOW) Page 1 01'2 STATE: WA Funding Opportunity Announcem ent Number DE-FOA..QOOOO13 Procurement Instrument Number NEPA Control Number CID Number DE-EEOOOO853 '1t;..o -6ObC>g5~- 0(.::)\ EE81128 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the foUowing determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Aclions 10 conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase Ihe indoor concentrations of potentially harmful substances, These actions may involve financial and technical

457

u.s. DEPARn.'lENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlVIINATION  

Broader source: Energy.gov (indexed) [DOE]

MC·EFl. MC·EFl. u.s. DEPARn.'lENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlVIINATION RECIPIENT:Clark County PROJECT TITLE: EECBG ~ WSU Building Upgrades & Resource Conservation Mgr Page 1 01'2 STATE: WA Funding Opportunity Announcement Number DE-FOA-0000013 Procurement Instrument Number NEPA Control Number CID Number DE-EE0000856 GFO-OOOO856-001 EEO Based on my review or the infonnation concerning the proposed action, as NEPA Compliance Officer (authoriud under DOE Order 451.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A11 Technical advice and planning assistance to international, national, state, and local organizations. 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not

458

Program or Field Office: Office of Legacy Management Project Title and I.D. No.: Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida,  

Broader source: Energy.gov (indexed) [DOE]

Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida, Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida, LM 13-13 Location: Largo, Florida Proposed Action or Project Description: DOE proposes to use a Geoprobe to inject emulsified edible soybean oil (EEO) and anaerobic microbial solution into the surficial aquifer at the 4.5 Acre Site adjacent to the DOE Young - Rainey STAR Center (Pinellas Site) in Largo, Florida. The proposed action would enhance naturally occurring anaerobic biodegradation, thereby reducing vinyl chloride contamination along the southwest boundary of the 4.5 Acre Site. Dehalococcoides ethenogenes (DHE) is a type of microbe that occurs naturally in the aquifer. Bioaugmentation with a commercially available DHE culture used in conjunction with the EEO would maximize the efficiency of contaminant biodegradation. No genetically engineered or

459

Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

460

ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT (EECBG) - BETTER BUILDINGS NEIGHBORHOOD PROGRAM AT GREATER CINCINNATI ENERGY ALLIANCE Project Title: Home Performance with Energy Star and Better Buildings Performance  

SciTech Connect (OSTI)

The Greater Cincinnati Energy Alliance (Energy Alliance) is a nonprofit economic development agency dedicated to helping Greater Cincinnati and Northern Kentucky communities reduce energy consumption. The Energy Alliance has launched programs to educate homeowners, commercial property owners, and nonprofit organizations about energy efficiency opportunities they can use to drive energy use reductions and financial savings, while extending significant focus to creating/retaining jobs through these programs. The mission of the Energy Alliance is based on the premise that investment in energy efficiency can lead to transformative economic development in a region. With support from seven municipalities, the Energy Alliance began operation in early 2010 and has been among the fastest growing nonprofit organizations in the Greater Cincinnati/Northern Kentucky area. The Energy Alliance offers two programs endorsed by the Department of Energy: the Home Performance with ENERGY STAR Program for homeowners and the Better Buildings Performance Program for commercial entities. Both programs couple expert guidance, project management, and education in energy efficiency best practices with incentives and innovative energy efficiency financing to help building owners effectively invest in the energy efficiency, comfort, health, longevity, and environmental impact of their residential or commercial buildings. The Energy Alliance has raised over $23 million of public and private capital to build a robust market for energy efficiency investment. Of the $23 million, $17 million was a direct grant from the Department of Energy Better Buildings Neighborhood Program (BBNP). The organizations investments in energy efficiency projects in the residential and commercial sector have led to well over $50 million in direct economic activity and created over 375,000 hours of labor created or retained. In addition, over 250 workers have been trained through the Building Performance Training Center, a program that was developed and funded by the Energy Alliance and housed at Cincinnati State Technical and Community College. Nearly 100 residential and commercial contractors currently participate in the Energy Alliances two major programs, which have together served over 2,800 residential and 100 commercial customers. Additionally, the Energy Alliance established loan programs for homeowners, nonprofits and commercial businesses. The GC-HELP program was established to provide up to ten year low interest, unsecured loans to homeowners to cover the energy efficiency products they purchased through the Energy Alliance approved contractor base. To date the Energy Alliance has financed over $1 million in energy efficiency loans for homeowners, without any loans written off. The nonprofit business community is offered five year, fixed-interest rate loans through the Building Communities Loan Fund of $250,000. Additionally, the Energy Alliance has developed GC-PACE, a commercial financing tool that enables buildings owners to finance their energy upgrades through voluntary property assessments deploying low-interest extended-term capital from the bond market. The Energy Alliance and its partners are actively evaluating additional market-based financing solutions.

Holzhauser, Andy; Jones, Chris; Faust, Jeremy; Meyer, Chris; Van Divender, Lisa

2013-12-30T23:59:59.000Z

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Flyer, Title VI  

Broader source: Energy.gov [DOE]

Titles VI and IX of the Civil Rights Act of 1964, as amended prohibit discrimination in programs and activities receiving Federal financial assistance.

462

u.s. DEPARTMENT OF ENERGY EERE PROJECT MAN AG EMENT CENTER NEPA DETERlVIINATION  

Broader source: Energy.gov (indexed) [DOE]

AG EMENT CENTER AG EMENT CENTER NEPA DETERlVIINATION RECIPIENT:Snohomish County PUD PROJECT TITLE : Development of Post-Installation Monitoring Capabilities Page lof3 STATE: WA Funding Opportunity Announcement Number Procurement Instrument Numbu NEPA Control Number CID Number NlA - CDP DE-EE0000301 GF0-00003Q1'()()2 EE301 Based on my review orlhe information concerning the proposed action, as NEPA Compliance Officer (authori7.ed under DOE Order 451.IA), I have made the following determination: ex, EA, [IS APPENDIX AND NUMBER: Description : AS Informabon gathering (including, but nollimiled 10, literature surveys, inventories, audits), data analYSIS (including computer modeling), document preparation (sud1 as conceptual design or feasibility studies, analytical erJergy supply and

463

u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERIVIINATION  

Broader source: Energy.gov (indexed) [DOE]

DETERIVIINATION DETERIVIINATION Page 1 of2 RECIPIENT:INFINIA CORPORATION STATE: WA PROJECf TITLE: Innovative Phase Change Thennal Energy Storage Solution for Baseload Power Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-FOA-OOOO104 DE-EEOOO3585 GFO-10-490 G03585 Based on my review of the information concerning the proposed action, as NEPA Campliance Officer (authori7.ed under DOE Order 45I.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 83.6 Siting, construction (or modification), operation, and decommissioning of facilities for indoor bench-scale research projects and conventional laboralory operations (for example. preparation of chemical standards and sample analysis);

464

U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER Nl!PA DEl1!RMINATION  

Broader source: Energy.gov (indexed) [DOE]

PA DEl1!RMINATION PA DEl1!RMINATION RECIPIENT:Snohomish County PUD PROJECT TITLE: Acoustic Effects of Hydrokinetic Tidal Turbines Page 1 00 STATE: WA funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA..()()()()()69 DE-EEOOO2654 GF0-10-171 0 Based on my review oflhe information concerning the proposed adion, as NEPA CompliaDce Officer (authorized under DOE Order451.1A), I have made tbe following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 83.1 OnSlle and off site site characterizatIOn and environmental monitonng, Induding siting, construction (or modification). operatJon, and dismantlement or dosing (abandonment) of characterization and monitoring devices and siting, constructJon, and aSSOCIated operation of a small-scale laboratory building or renovation of a room in an existing building

465

U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAG EMENT CEN T ER  

Broader source: Energy.gov (indexed) [DOE]

CEN CEN T ER NEPA DETERl\IINATION Page 1 of2 RECIPIENT:King County PROJECT YWCA Family Village at Issaquah STATE: WA TITLE: Funding Opportunity Announcement Num~r Procurement Instrument Number NEPA Control Number CID Number DE-FOA-OOOOO13 DE-EEOOOO854 EEO Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 82.1 Modifications of an existing structure to enhance workplace habitability (including, but not limited to: improvements to lighting, radiation shielding, or heatinglventilatingl air conditioning and its instrumentation; and noise reduction ). 82.5 Safety and environmental improvements of a facility, including replacement and upgrade of facility components, that do

466

u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

King County King County PROJECT Engine Generator for Enumclaw Oairy Manure Digestor TITLE: Page I of 3 STATE: WA Funding Opportunity Announcement Number DE-FOA-OOOOO13 Procurement Instrument Number DE-EEOOOO854-003 NEPA Control Number elD Number EEO Based on my review of lhe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficlency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

467

US DEPARl'lIIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER Nl!PA DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

DEPARl'lIIENT OF ENERGY DEPARl'lIIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER Nl!PA DETERMINATION RECIPIENT: Snohomish County PUD PROJECf TITLE: Acoustic Effects of Hydrokinetic Tidal Turbines Page 1 on STATE: WA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000069 DE-EEOOO2654 GFQ-0002654-OO2 0 Based on my review orlhe Information concerning the proposed action, as NEPA Compliance Officer (authori1.ed under DOE Order 4S1.1A), I have made the following determination: ex, EA, EIS APPENDIX ANO NUMBER: Description: B3.3 Field and laboratory research, inventory, and information collection activities that are directly related to the conservation of fish or wildlife resources and that involve only negligible habitat destruction or population reduction

468

RECIPIENT:Whole Energy u.s. DEPARTlIIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

Whole Energy Whole Energy u.s. DEPARTlIIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETElaIINATION PROJECf TITLE : SEp· Biodiesel Refueling Infrastructure Page 1 of2 STATE: WA Funding Opportunity Announcement Number Procure ment Instrument Number NEPA Control Number CIO Number qFO-OOOoI'f!- O~1 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DO .. : Order4SI .IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 81.7 ACQuisition, installation, operation, and removal of oommunication systems, data processing equipment, and similar electronic equipment. A9 Information gathering (including, but nollimiled to, literature surveys, inventories, audits). data analysis (including

469

DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlVIINATION  

Broader source: Energy.gov (indexed) [DOE]

(lotI .. ]) (lotI .. ]) u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlVIINATION RECI PIENT:Washinglon Siale Department of Commerce PROJEcr TITLE: Evergreen State Solar Partnership Page I of2 STATE: WA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-QOOO549 DE-EE0005687 GF0-0Q05687-OO1 0 Based on my review orthe information concerning the proposed adion, as NEPA Com pliance Officer (authorized under DOE Order 4SI.IA). I have made the (ollowing determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A 11 Technical advice and assistance to organizations Technical advice and planning assistance to international, national, state, and local organizations. A9 Infonnallon gathering, analysis, and dissemination

470

W(A)93-039 STATEMENT OF CONSIDERATIONS  

Broader source: Energy.gov (indexed) [DOE]

39 39 STATEMENT OF CONSIDERATIONS Request by Air Products and Chemicals, Inc. for Waiver of Domestic and Foreign Patent Rights to inventions that may arise under Contract No. DE-FC04-93AL94461 between the United States Department of Energy (DOE) and Air Products and Chemicals, Inc. DOE Docket: W(A)93-039. The Petitioner, Air Products and Chemicals, Inc., (Air Products) has requested a waiver of all domestic and foreign patent rights to inventions which it may conceive or reduce to practice in the course of work under Contract No. DE-FC04-93AL94461 a Cooperative Agreement with DOE. The contract covers a four phase development program for a recently patented technology developed at Air Products entitled "Novel Selective Surface Flow (SSF T ) Membranes for the

471

GRR/Section 12-WA-a - Live Wildlife Taking Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 12-WA-a - Live Wildlife Taking Permit GRR/Section 12-WA-a - Live Wildlife Taking Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 12-WA-a - Live Wildlife Taking Permit 12-WA-a - Live Wildlife Taking Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Fish and Wildlife Regulations & Policies WAC 232-12-064 Triggers None specified In Washington, it is unlawful to take wildlife from the wild without permission from the Washington State Department of Fish and Wildlife (WDFW). The WDFW issues Live Wildlife Taking Permits under WAC 232-12-064. 12-WA-a - Live Wildlife Taking Permit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

472

Fisher & Paykel Appliances: ENERGY STAR Referral (WA42T26GW1) | Department  

Broader source: Energy.gov (indexed) [DOE]

Fisher & Paykel Appliances: ENERGY STAR Referral (WA42T26GW1) Fisher & Paykel Appliances: ENERGY STAR Referral (WA42T26GW1) Fisher & Paykel Appliances: ENERGY STAR Referral (WA42T26GW1) June 12, 2013 DOE referred the matter of Fisher & Paykel Appliances residential clothes washer, model WA42T26GW1, to the U.S. Environmental Protection Agency, brand manager for the ENERGY STAR Program, for appropriate action after DOE testing showed that the model does not meet the ENERGY STAR specification. Fisher & Paykel Appliances: ENERGY STAR Referral (WA42T26GW1) More Documents & Publications Regulatory Burden RFI DOE response to questions from AHAM on the supplemental proposed test procedure for residential clothes washers Scoping Study to Evaluate Feasibility of National Databases for EM&V Documents and Measure Savings: Appendices

473

GRR/Section 3-WA-b - Land Access Overview | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-WA-b - Land Access Overview GRR/Section 3-WA-b - Land Access Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-WA-b - Land Access Overview 3-WA-b - Land Access Overview.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Triggers None specified Any developer that needs access to or through state lands must obtain the appropriate permit or lease. The developer will obtain such permit or lease through the Washington State Department of Natural Resources. 3-WA-b - Land Access Overview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

474

CSCE4610: Project Grading Sheet (Krishna Kavi)  

E-Print Network [OSTI]

CSCE4610: Project Grading Sheet (Krishna Kavi) Assumption: A report on one or more commercially available architecture Student Name: _____________________________________________ Project Title. are used to determine the difficulty of the project 2. Project Details 60% Completeness Identification

Kavi, Krishna

475

Microbial community changes during sustained Cr(VI) reduction at the 100H site in Hanford, WA  

E-Print Network [OSTI]

at the 100H site in Hanford, WA Romy Chakraborty 1 , Eoin Lcontaminated aquifer at the Hanford (WA) 100H site in 2004.Cr(VI) reduction at Hanford, and a comparison of the

Chakraborty, Romy

2010-01-01T23:59:59.000Z

476

Module Title: Project Module Code: OPTO6005  

E-Print Network [OSTI]

Ibsen, Dr Ping Hua, Prof James Wilkinson Contact (email ID) sm@orc.soton.ac.uk, mi@orc.soton.ac.uk, ph2@orc.soton.ac.uk, jsw@orc.soton.ac.uk Is the module subject to external accreditation? No If yes and optical labs of the ORC 3. Train in technical and hands-on research skills to gain technical insight

Anderson, Jim

477

Two Line Subject Title One Line Title  

Broader source: Energy.gov (indexed) [DOE]

Title IX, Subtitle J (EPAct Title IX, Subtitle J (EPAct 2005) Complementary Program - Office of Research and Development September 2008 2 3 Complementary Program NETL - ORD * Areas of research - Drilling Under Extreme Conditions - Environmental Impacts of Oil and Gas - Enhanced and Unconventional Oil Recovery - Resource Assessment * Institute for Advanced Energy Solutions - West Virginia University, Carnegie-Mellon University, and University of Pittsburgh * Penn State University and Oregon State University 4 Drilling Under Extreme Conditions * Ultra-deep single cutter drilling simulator - Recreates bottom-hole drilling environment of ultra-deep wells (30,000 psi and 481 o F) - Delivered to NETL later this year - Operates with real drilling fluids - X-ray video system images cuttings - Verify the results of the full bit

478

Global Environmental Course Title  

E-Print Network [OSTI]

Department Global Environmental Studies Room Course Title Frontier of Sustainability Science Instructor Akihisa MORI, Global Environmental Studies Satoshi KONISHI, Institute of Advanced consisting from a variety of academic field, including philosophy, politics, economics, energy, architecture

Takada, Shoji

479

LM's New Role for the DOE Title X Reimbursement Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program October 16, 2012 - 10:01am Addthis LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program What does this project do? Goal 4. Optimize the use of land and assets Title X of the Energy Policy Act of 1992 authorized U.S. Department of Energy (DOE) to reimburse licensees of 1 thorium and 13 uranium processing sites (Figure 1) for a portion of their remedial action costs attributable

480

LM's New Role for the DOE Title X Reimbursement Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program October 16, 2012 - 10:01am Addthis LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program What does this project do? Goal 4. Optimize the use of land and assets Title X of the Energy Policy Act of 1992 authorized U.S. Department of Energy (DOE) to reimburse licensees of 1 thorium and 13 uranium processing sites (Figure 1) for a portion of their remedial action costs attributable

Note: This page contains sample records for the topic "wa project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

RAPID/Roadmap/8-WA-a | Open Energy Information  

Open Energy Info (EERE)

for the project or ownership of land on which the project will be located; Information or data that may be available at a later date; A summary and timeline of any initial...

482

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research and Development Research and Development Project Review Meeting Presenter: John Litynski, PE United States Department of Energy, National Energy Technology Laboratory, U.S. DOE Office of Fossil Energy National Energy Technology Laboratory August 21-23, 2012 Pittsburgh, PA 2 WELCOME 3 * Annual requirement in all cooperative agreements and grants * First complete program review of 126 carbon storage projects - 7 Regional Partnerships (Large scale injection projects) - 14 Infrastructure (Injection, Characterization, systems modeling) - 38 Geologic Storage - 28 Simulation and Risk Assessment - 26 Monitoring, Verification, and Accounting (MVA) - 6 CO2 Use and Reuse - 7 Training Centers * Report on technical progress and financial status of projects * 55 Posters

483

Philip E. Long, Ph.D. Geological Project Scientist and Deputy Lead, Sustainable Systems Science Focus Area  

E-Print Network [OSTI]

, Westinghouse Hanford Co. Richland, WA 1979 Assistant Professor, Geology, Central Washington University, Ellensburg, WA 1977-1978 Sr. Scientist, Basalt Waste Isolation Project, Rockwell Hanford Operations, Richland Presentations Dr. Long has presented multiple invited lectures and presentations at society meetings over

Ajo-Franklin, Jonathan

484

EIS-0467: Hanford Site Natural Gas Pipeline, Richland, WA | Department of  

Broader source: Energy.gov (indexed) [DOE]

7: Hanford Site Natural Gas Pipeline, Richland, WA 7: Hanford Site Natural Gas Pipeline, Richland, WA EIS-0467: Hanford Site Natural Gas Pipeline, Richland, WA Summary This EIS will evaluate the environmental impacts of a proposal to enter into a contract with a licensed natural gas supplier in Washington State to construct, operate, and maintain a natural gas pipeline. The pipeline would deliver natural gas to support the Waste Treatment Plant and the 242-A Evaporator operations in the 200 East Area of the Hanford Site. Public Comment Opportunities None available at this time. For more information, contact: Mr. Douglas Chapin, NEPA Document Manager U.S. Department of Energy Richland Operations Office P.O. Box 550, MSIN A5-11 Richland, WA 99352 Documents Available for Download January 23, 2012 EIS-0467: Notice of Intent to Prepare an Environmental Impact Statement and

485

GRR/Section 9-WA-c - State Environmental Impact Statement | Open Energy  

Open Energy Info (EERE)

GRR/Section 9-WA-c - State Environmental Impact Statement GRR/Section 9-WA-c - State Environmental Impact Statement < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 9-WA-c - State Environmental Impact Statement 9-WA-c - State Environmental Impact Statement.pdf Click to View Fullscreen Triggers None specified The primary purpose of an Environmental Impact Statement (EIS) is to ensure that the Washington State Environmental Policy Act (SEPA) policies are an integral part of the ongoing programs and actions of state and local government. An EIS must provide impartial discussion of significant environmental impacts and must inform decision makers and the public of reasonable alternatives, including mitigation measures that would avoid or minimize adverse impacts or enhance environmental quality. WAC 197-11-400.

486

GRR/Section 19-WA-f - Water Well NOI for Replacement or Additional Wells |  

Open Energy Info (EERE)

GRR/Section 19-WA-f - Water Well NOI for Replacement or Additional Wells GRR/Section 19-WA-f - Water Well NOI for Replacement or Additional Wells < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-f - Water Well NOI for Replacement or Additional Wells 19-WA-f - Water Well NOI for Replacement or Additional Wells.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington 90.44.100 Revised Code of Washington 18.104.048 Washington Administrative Code 173-160-151 Triggers None specified A developer seeking to use ground water for an activity may need to drill a new well in a different location than a previous well, drill an additional well at an existing location, or drill a replacement well at the same

487

GRR/Section 14-WA-c - Underground Injection Control Permit | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-WA-c - Underground Injection Control Permit GRR/Section 14-WA-c - Underground Injection Control Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-WA-c - Underground Injection Control Permit 14-WA-c - Underground Injection Control Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Chapter 173-218 WAC Non-endangerment Standard Triggers None specified The Safe Drinking Water Act requires Washington to implement technical criteria and standards to protect underground sources of drinking water from contamination. Under Chapter 173-218 WAC, the Washington State Department of Ecology (WSDE) regulates and permits underground injection control (UIC) wells in Washington. The Environmental Protection Agency

488

GRR/Section 18-WA-a - Underground Storage Tank Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 18-WA-a - Underground Storage Tank Process GRR/Section 18-WA-a - Underground Storage Tank Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-WA-a - Underground Storage Tank Process 18-WA-a - Underground Storage Tank Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington Chapter 90.76 Washington Administrative Code Chapter 173-360 Triggers None specified Washington has a federally-approved state Underground Storage Tank (UST) program regulated by the Washington State Department of Ecology (WSDE) under Revised Code of Washington Chapter 90.76 and Washington Administrative Code Chapter 173-360. Washington defines an "Underground

489

GRR/Section 5-WA-a - Drilling and Well Development | Open Energy  

Open Energy Info (EERE)

GRR/Section 5-WA-a - Drilling and Well Development GRR/Section 5-WA-a - Drilling and Well Development < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 5-WA-a - Drilling and Well Development 5-WA-a.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Regulations & Policies Geothermal Act 78.60 RCW Geothermal Rules 332-17 WAC Triggers None specified In Washington geothermal drilling and well development are regulated by the Washington State Department of Natural Resources (WSDNR). Geothermal production wells and core holes deeper than 750ft require the developer go through the whole WSDNR permitting process (which requires a public hearing) and require that the developer complete the State Environmental

490

GRR/Section 3-WA-e - State Right of Way Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-WA-e - State Right of Way Process GRR/Section 3-WA-e - State Right of Way Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-WA-e - State Right of Way Process 3-WA-e - State Right of Way Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Regulations & Policies RCW 79-36-350 RCW 79-36-520 RCW 79-36-530 Triggers None specified This flowchart illustrates the process for obtaining a right of way over state lands in Washington. The right of way process is overseen by the Washington State Department of Natural Resources (WSDNR). The right of way process is regulated under Revised Code of Washington (RCW) 79-36-350. The developer may apply for an easement, permit or license for a right of

491

GRR/Section 14-WA-d - Section 401 Water Quality Certification | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-WA-d - Section 401 Water Quality Certification GRR/Section 14-WA-d - Section 401 Water Quality Certification < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-WA-d - Section 401 Water Quality Certification 14-WA-d - 401 Water Quality Certification.pdf Click to View Fullscreen Contact Agencies U S Army Corps of Engineers Washington State Department of Ecology Regulations & Policies Revised Statute of Washington Chapter 90.48 Washington Administrative Code Chapter 173-201A Washington Administrative Code 173-225-030 Triggers None specified Developers requiring a Section 404 Dredge and Fill Permit from the U S Army Corps of Engineers (Corps) are required to obtain a Section 401 Water Quality Certification from the state of Washington. The Washington State

492

GRR/Section 19-WA-d - Water Conservancy Board Transfer or Change of Water  

Open Energy Info (EERE)

19-WA-d - Water Conservancy Board Transfer or Change of Water 19-WA-d - Water Conservancy Board Transfer or Change of Water Right < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-d - Water Conservancy Board Transfer or Change of Water Right 19-WA-d - Water Conservancy Board Transfer or Change of Water Right.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington Chapter 90.80 RCW 90.03.380 90.03.390 RCW 90.44.100 Triggers None specified In 1997, the Washington Legislature authorized the creation of water conservancy boards through the enactment of Revised Code of Washington Chapter 90.80 to expedite the administrative process for voluntary water right transfers within individual counties. In counties where a water

493

GRR/Section 19-WA-e - Water Well Notice of Intent for New Well | Open  

Open Energy Info (EERE)

GRR/Section 19-WA-e - Water Well Notice of Intent for New Well GRR/Section 19-WA-e - Water Well Notice of Intent for New Well < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-e - Water Well Notice of Intent for New Well 19-WA-e - Water Well Notice of Intent for New Well.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington 18.104.048 Washington Administrative Code 173-160-151 Triggers None specified A developer seeking to use ground water for an activity may need to drill a new well to access the ground water. When a developer needs to drill a new well, the developer must complete the Notice of Intent (NOI) to Drill a Well form and submit the form to the Washington State Department of Ecology

494

GRR/Section 14-WA-b - State NPDES Permitting Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-WA-b - State NPDES Permitting Process GRR/Section 14-WA-b - State NPDES Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-WA-b - State NPDES Permitting Process 14-WA-b - State NPDES Permitting Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology United States Environmental Protection Agency Regulations & Policies Clean Water Act Chapter 90.48 RCW Chapter 173-216 WAC Triggers None specified Section 402 of the Clean Water Act (CWA) required the Environmental Protection Agency (EPA) to establish the National Pollutant Discharge Elimination System (NPDES) to regulate discharge of pollutants from point sources. In Washington, the EPA has delegated responsibility of NPDES to

495

GRR/Section 4-WA-a - State Exploration Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 4-WA-a - State Exploration Process GRR/Section 4-WA-a - State Exploration Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 4-WA-a - State Exploration Process 4-WA-a State Exploration Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Regulations & Policies Geothermal Act 78.60 RCW Geothermal Rules 332-17 WAC Triggers None specified Geothermal exploration in Washington requires a Geothermal Exploration Permit from the Washington State Department of Natural Resources (WSDNR) for invasive exploration or drilling. Operations that require an exploration or drilling permit will also require the developer to initiate the State Environmental Policy Act (SEPA). In Washington geothermal resources are regulated under Chapter 78.60 RCW

496

GRR/Section 3-WA-d - State Land Lease | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-WA-d - State Land Lease GRR/Section 3-WA-d - State Land Lease < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-WA-d - State Land Lease 3-WA-d - State Land Lease.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Regulations & Policies RCW 79-13-020 RCW 79-13-140 RCW 79-13-150 WAC 332-22-030 WAC 332-22-105 WAC 332-22-110 Triggers None specified This flowchart illustrates the process used to lease state lands in Washington. The Washington State Department of Natural Resources (WSDNR) oversees the land leasing process through the Commissioner of Public Lands ("commissioner"). The WSDNR may lease state lands for purposes it deems advisable, including commercial, industrial, residential, agricultural, and

497

GRR/Section 3-WA-c - Utility Franchise or Permit Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 3-WA-c - Utility Franchise or Permit Process GRR/Section 3-WA-c - Utility Franchise or Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-WA-c - Utility Franchise or Permit Process 3-WA-c - Utility Franchise or Permit Process (1).pdf Click to View Fullscreen Contact Agencies Washington State Department of Transportation Regulations & Policies WAC 468-34-060 WAC 468-34-080 WAC 468-34-110 WAC 468-34-160 WAC 468-34-170 Triggers None specified This flowchart illustrates the process of obtaining a franchise or permit through a state highway right of way in Washington State. A utility permit or franchise is required for occupancy of a highway right of way by utility facilities, including private lines. WAC 468-34-160. The process is

498

GRR/Section 19-WA-b - New Water Right Permit Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 19-WA-b - New Water Right Permit Process GRR/Section 19-WA-b - New Water Right Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-b - New Water Right Permit Process 19-WA-b - New Water Right Permit Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington Chapter 90.03 Revised Code of Washington Chapter 90.44 Triggers None specified Washington uses a prior appropriation system for the distribution of both surface water and ground water rights in which water users receive the right to use water on a "first in time, first in right" basis. Under Washington law, the waters of Washington belong collectively to the public

499

GRR/Section 19-WA-c - Transfer or Change of Water Right | Open Energy  

Open Energy Info (EERE)

9-WA-c - Transfer or Change of Water Right 9-WA-c - Transfer or Change of Water Right < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-c - Transfer or Change of Water Right 19-WA-c - Transfer or Change of Water Right.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington 90.03.380 Revised Code of Washington 90.44.100 Revised Code of Washington Chapter 90.80 Triggers None specified Much of Washington's public waters have been accounted for through water right claims, permits, or certificates. As a result, many individuals seeking water rights try to acquire existing water rights already in use or change the use of a current water right they already hold. Certain elements

500

NEURAL NETWORKS FOR DISCRETE TOMOGRAPHY K.J. Batenburg a W.A. Kosters b  

E-Print Network [OSTI]

NEURAL NETWORKS FOR DISCRETE TOMOGRAPHY K.J. Batenburg a W.A. Kosters b a Mathematical Institute of crystalline solids at atomic resolution from electron microscopic images can be considered the ``holy grail

Kosters, Walter