National Library of Energy BETA

Sample records for volume 1-quarterly projections

  1. Multivariate volume visualization through dynamic projections

    SciTech Connect (OSTI)

    Liu, Shusen; Wang, Bei; Thiagarajan, Jayaraman J.; Bremer, Peer -Timo; Pascucci, Valerio

    2014-11-01

    We propose a multivariate volume visualization framework that tightly couples dynamic projections with a high-dimensional transfer function design for interactive volume visualization. We assume that the complex, high-dimensional data in the attribute space can be well-represented through a collection of low-dimensional linear subspaces, and embed the data points in a variety of 2D views created as projections onto these subspaces. Through dynamic projections, we present animated transitions between different views to help the user navigate and explore the attribute space for effective transfer function design. Our framework not only provides a more intuitive understanding of the attribute space but also allows the design of the transfer function under multiple dynamic views, which is more flexible than being restricted to a single static view of the data. For large volumetric datasets, we maintain interactivity during the transfer function design via intelligent sampling and scalable clustering. As a result, using examples in combustion and climate simulations, we demonstrate how our framework can be used to visualize interesting structures in the volumetric space.

  2. CleanFleet. Volume 2, Project Design and Implementation

    SciTech Connect (OSTI)

    1995-12-01

    The CleanFleet alternative fuels demonstration project evaluated five alternative motorfuels in commercial fleet service over a two-year period. The five fuels were compressed natural gas, propane gas, California Phase 2 reformulated gasoline (RFG), M-85 (85 percent methanol and 15 percent RFG), and electric vans. Eight-four vans were operated on the alternative fuels and 27 vans were operated on gasoline as baseline controls. Throughout the demonstration information was collected on fleet operations, vehicle emissions, and fleet economics. In this volume of the CleanFleet findings, the design and implementation of the project are summarized.

  3. Breckinridge Project, initial effort. Report III, Volume 2. Specifications

    SciTech Connect (OSTI)

    1982-01-01

    Report III, Volume 2 contains those specifications numbered K through Y, as follows: Specifications for Compressors (K); Specifications for Piping (L); Specifications for Structures (M); Specifications for Insulation (N); Specifications for Electrical (P); Specifications for Concrete (Q); Specifications for Civil (S); Specifications for Welding (W); Specifications for Painting (X); and Specifications for Special (Y). The standard specifications of Bechtel Petroleum Incorporated have been amended as necessary to reflect the specific requirements of the Breckinridge Project and the more stringent specifications of Ashland Synthetic Fuels, Inc. These standard specifications are available for the Initial Effort (Phase Zero) work performed by all contractors and subcontractors.

  4. Southline Transmission Line Project - Volume 1 Front Matter

    Energy Savers [EERE]

    WESTERN BLM/NM/PL-14-01-1610 * DOE/EIS-0474 Southline Transmission Line Project Final Environmental Impact Statement Volume 1 of 4 October 2015 MISSION STATEMENT The Bureau of Land Management is responsible for stewardship of our public lands. The BLM is committed to manage, protect, and improve these lands in a manner to serve the needs of the American people. Management is based upon the principles of multiple use and sustained yield of our Nation's resources within the framework of

  5. Proposed Southline Transmission Line Project - Volume 3 of 4...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Right-of-Way ... G-1 11 12 13 VOLUME SUMMARY 14 15 Volume 1 - Executive Summary, Chapters 1, 2, and 3 16 Volume 2 -...

  6. Revised SRC-I project baseline. Volume 1

    SciTech Connect (OSTI)

    Not Available

    1984-01-01

    International Coal Refining Company (ICRC), in cooperation with the Commonwealth of Kentucky has contracted with the United States Department of Energy (DOE) to design, build and operate a first-of-its-kind plant demonstrating the economic, environmental, socioeconomic and technical feasibility of the direct coal liquefaction process known as SRC-I. ICRC has made a massive commitment of time and expertise to design processes, plan and formulate policy, schedules, costs and technical drawings for all plant systems. These fully integrated plans comprise the Project Baseline and are the basis for all future detailed engineering, plant construction, operation, and other work set forth in the contract between ICRC and the DOE. Volumes I and II of the accompanying documents constitute the updated Project Baseline for the SRC-I two-stage liquefaction plant. International Coal Refining Company believes this versatile plant design incorporates the most advanced coal liquefaction system available in the synthetic fuels field. SRC-I two-stage liquefaction, as developed by ICRC, is the way of the future in coal liquefaction because of its product slate flexibility, high process thermal efficiency, and low consumption of hydrogen. The SRC-I Project Baseline design also has made important state-of-the-art advances in areas such as environmental control systems. Because of a lack of funding, the DOE has curtailed the total project effort without specifying a definite renewal date. This precludes the development of revised accurate and meaningful schedules and, hence, escalated project costs. ICRC has revised and updated the original Design Baseline to include in the technical documentation all of the approved but previously non-incorporated Category B and C and new Post-Baseline Engineering Change Proposals.

  7. Recovery Efficiency Test Project Phase 2 activity report, Volume 1

    SciTech Connect (OSTI)

    Overbey, W.K. Jr.; Salamy, S.P.; Locke, C.D.

    1989-02-01

    The purpose of Phase II operations of the Recovery Efficiency Test Project is to enhance the natural production of the well and evaluate the relative improvement as a function of the type of stimulation conducted. Another purpose is to compare the stimulated production performance of the horizontal well with vertical wells in the field. The objectives considered for Phase II operations and plans were: (1) Develop a rationale for a systematic approach to designing stimulations for the well. (2) Conduct a series of stimulations designed to optimize the fluids, injection rates, proppant volumes and general approach to stimulating a horizontal well with similar geologic conditions. (3) Develop and test a method or methods for determining the geometry of stimulation-induced fractures. (4) Conduct tests and analyze the results to determine the efficiency of stimulation operations. The technical approach pursued in developing plans to accomplish three objectives was to: (1) Review the data needs for all objectives and obtain that data first. (2) Identify the operating geologic, geomechanical, and reservoir parameters that need additional clarification or definition. (3) Investigate existing models which could be used to plan or evaluate stimulation on the well and the reservoir. (4) Plan for analysis and verification of models and approaches.

  8. Clean Coal Technology Programs: Completed Projects (Volume 2)

    SciTech Connect (OSTI)

    Assistant Secretary for Fossil Energy

    2003-12-01

    Annual report on the Clean Coal Technology Demonstration Program (CCTDP), Power Plant Improvement Initiative (PPII), and Clean Coal Power Initiative (CCPI). The report addresses the roles of the programs, implementation, funding and costs, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

  9. Proposed Southline Transmission Line Project - Volume 4 of 4...

    Office of Environmental Management (EM)

    2 Appendix J J-1 Southline Transmission Line Project Draft Environmental Impact Statement and Draft Resource Management Plan Amendment BLM LAND USE AUTHORIZATIONS 1...

  10. Secretary's annual report to Congress. Volume III. Project summaries

    SciTech Connect (OSTI)

    1981-01-01

    Progress and status of representative projects in each program within DOE are summarized. Subjects covered and the number of projects reported on are: conservation (2); fossil energy (11); nuclear energy (5); renewable energy resources (16); energy production and power marketing (3); general science (11); defense programs (7); contingency planning (3); and management and oversight (1). (MCW)

  11. Report to Congress on abnormal occurrences. Volume 16, No. 1, Quarterly report, January--March 1993

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    Section 208 of the Energy Reorganization Act of 1974 identifies an abnormal occurrence as an unscheduled incident or event that the Nuclear Regulatory Commission determines to be significant from the standpoint of public health and safety and requires a quarterly report of such events to be made to Congress. This report covers the period January through March 1993. There is one abnormal occurrence at a nuclear power plant disposed in this report that involved a steam generator tube rupture at Palo Verde Unit 2, and none for fuel cycle facilities. Three abnormal occurrences involving medical misadminstrations (two therapeutic and one diagnostic) at NRC-licensed facilities are also discussed in this report. No abnormal occurrences were reported by NRC`s Agreement States. The report also contains information updating previously reported abnormal occurrences.

  12. Final Technical Report - Kotzebue Wind Power Project - Volume II

    SciTech Connect (OSTI)

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  13. Now Available: Pacific Northwest Smart Grid Demonstration Project- Technology Performance Report Volume 1

    Broader source: Energy.gov [DOE]

    The Pacific Northwest Smart Grid Demonstration, a $179 million project that was co-funded by the DOE in late 2009, was one of 16 regional smart grid demonstrations funded by the American Recovery and Reinvestment Act. The first volume of the technology performance report for the project is now available for downloading on SmartGrid.gov.

  14. Hanford spent nuclear fuel project recommended path forward, volume III: Alternatives and path forward evaluation supporting documentation

    SciTech Connect (OSTI)

    Fulton, J.C.

    1994-10-01

    Volume I of the Hanford Spent Nuclear Fuel Project - Recommended Path Forward constitutes an aggressive series of projects to construct and operate systems and facilities to safely retrieve, package, transport, process, and store K Basins fuel and sludge. Volume II provided a comparative evaluation of four Alternatives for the Path Forward and an evaluation for the Recommended Path Forward. Although Volume II contained extensive appendices, six supporting documents have been compiled in Volume III to provide additional background for Volume II.

  15. Volume 1 Great Northern Transmission Line Project FEIS Part 3

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement 7.0 Cumulative and Other Impacts 667 7.2.1 Past Actions Past actions are those actions and their associated impacts that occurred within or influenced the geographic region of influence (ROI) of each resource and have shaped the current affected environment of the proposed Project area. For the purposes of this Environmental Impact Statement (EIS), actions that have occurred in the past and their associated impacts are now part of the existing environment and

  16. Southline Transmission Line Project - Volume 3 Chapter 3

    Energy Savers [EERE]

    629 Chapter 4 ENVIRONMENTAL CONSEQUENCES 4.1 INTRODUCTION This chapter presents the results of the environmental impact analysis for the various resources introduced in chapter 3 of this EIS. The analysis of potential environment impacts has been updated since the Draft EIS to a discussion of the route variations new to the Final EIS (P7a-d and U3aPC). 4.1.1 Impact Assessment The proposed Project and alternatives outlined in chapter 2 may cause, directly or indirectly, changes in the human

  17. Environmental information volume: Liquid Phase Methanol (LPMEOH{trademark}) project

    SciTech Connect (OSTI)

    1996-05-01

    The purpose of this project is to demonstrate the commercial viability of the Liquid Phase Methanol Process using coal-derived synthesis gas, a mixture of hydrogen and carbon monoxide. This report describes the proposed actions, alternative to the proposed action, the existing environment at the coal gasification plant at Kingsport, Tennessee, environmental impacts, regulatory requirements, offsite fuel testing, and DME addition to methanol production. Appendices include the air permit application, solid waste permits, water permit, existing air permits, agency correspondence, and Eastman and Air Products literature.

  18. SLUDGE TREATMENT PROJECT ALTERNATIVES ANALYSIS SUMMARY REPORT [VOLUME 1

    SciTech Connect (OSTI)

    FREDERICKSON JR; ROURK RJ; HONEYMAN JO; JOHNSON ME; RAYMOND RE

    2009-01-19

    Highly radioactive sludge (containing up to 300,000 curies of actinides and fission products) resulting from the storage of degraded spent nuclear fuel is currently stored in temporary containers located in the 105-K West storage basin near the Columbia River. The background, history, and known characteristics of this sludge are discussed in Section 2 of this report. There are many compelling reasons to remove this sludge from the K-Basin. These reasons are discussed in detail in Section1, and they include the following: (1) Reduce the risk to the public (from a potential release of highly radioactive material as fine respirable particles by airborne or waterborn pathways); (2) Reduce the risk overall to the Hanford worker; and (3) Reduce the risk to the environment (the K-Basin is situated above a hazardous chemical contaminant plume and hinders remediation of the plume until the sludge is removed). The DOE-RL has stated that a key DOE objective is to remove the sludge from the K-West Basin and River Corridor as soon as possible, which will reduce risks to the environment, allow for remediation of contaminated areas underlying the basins, and support closure of the 100-KR-4 operable unit. The environmental and nuclear safety risks associated with this sludge have resulted in multiple legal and regulatory remedial action decisions, plans,and commitments that are summarized in Table ES-1 and discussed in more detail in Volume 2, Section 9.

  19. Renewable Resources: a national catalog of model projects. Volume 3. Southern Solar Energy Center Region

    SciTech Connect (OSTI)

    1980-07-01

    This compilation of diverse conservation and renewable energy projects across the United States was prepared through the enthusiastic participation of solar and alternate energy groups from every state and region. Compiled and edited by the Center for Renewable Resources, these projects reflect many levels of innovation and technical expertise. In many cases, a critique analysis is presented of how projects performed and of the institutional conditions associated with their success or failure. Some 2000 projects are included in this compilation; most have worked, some have not. Information about all is presented to aid learning from these experiences. The four volumes in this set are arranged in state sections by geographic region, coinciding with the four Regional Solar Energy Centers. The table of contents is organized by project category so that maximum cross-referencing may be obtained. This volume includes information on the Southern Solar Energy Center Region. (WHK)

  20. Renewable Resources: a national catalog of model projects. Volume 1. Northeast Solar Energy Center Region

    SciTech Connect (OSTI)

    1980-07-01

    This compilation of diverse conservation and renewable energy projects across the United States was prepared through the enthusiastic participation of solar and alternate energy groups from every state and region. Compiled and edited by the Center for Renewable Resources, these projects reflect many levels of innovation and technical expertise. In many cases, a critique analysis is presented of how projects performed and of the institutional conditions associated with their success or failure. Some 2000 projects are included in this compilation; most have worked, some have not. Information about all is presented to aid learning from these experiences. The four volumes in this set are arranged in state sections by geographic region, coinciding with the four Regional Solar Energy Centers. The table of contents is organized by project category so that maximum cross-referencing may be obtained. This volume includes information on the Northeast Solar Energy Center Region. (WHK).

  1. Renewable Resources: a national catalog of model projects. Volume 4. Western Solar Utilization Network Region

    SciTech Connect (OSTI)

    1980-07-01

    This compilation of diverse conservation and renewable energy projects across the United States was prepared through the enthusiastic participation of solar and alternate energy groups from every state and region. Compiled and edited by the Center for Renewable Resources, these projects reflect many levels of innovation and technical expertise. In many cases, a critique analysis is presented of how projects performed and of the institutional conditions associated with their success or failure. Some 2000 projects are included in this compilation; most have worked, some have not. Information about all is presented to aid learning from these experiences. The four volumes in this set are arranged in state sections by geographic region, coinciding with the four Regional Solar Energy Centers. The table of contents is organized by project category so that maximum cross-referencing may be obtained. This volume includes information on the Western Solar Utilization Network Region. (WHK)

  2. Aguirre Offshore GasPort Project Final Environmental Impact Statement_Volume I

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulatory Commission Office of Energy Projects Washington, DC 20426 Aguirre Offshore GasPort Project Final Environmental Impact Statement Aguirre Offshore GasPort, LLC Volume I Docket Nos. CP13-193-000 and PF12-4-000 Cooperating Agencies: FERC/EIS-0253F U.S. Environmental Protection Agency U.S. Coast Guard Puerto Rico Permits Management Office Puerto Rico Environmental Quality Board Puerto Rico Planning Board Puerto Rico Department of Natural and Environmental Resources Puerto Rico Department

  3. Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 2 (CDP)

    Office of Environmental Management (EM)

    PRELIMINARY TECHNOLOGY OF THE CALCINE Prepared by the U.S. Department of Energy ECHNOLOGY READINESS ASSESSMENT ALCINE DISPOSITION PROJECT VOLUME TWO Anthony F. Kluk Hoyt C. Johnson Clyde Phillip McGinnis Michael Rinker Steven L. Ross Herbert G. Sutter John Vienna February 2011 Prepared by the U.S. Department of Energy Washington, DC SSESSMENT ROJECT 412.09 (06/03/2009 - Rev. 11) CALCINE DISPOSITION PROJECT TECHNOLOGY MATURATION PLAN Identifier: Revision*: Page: PLN-1482 2 C-1 of C-317 Appendix C

  4. Draft Northern Pass Transmission Line Project Environmental Impact Statement Volume 1: Impact Analyses

    Office of Environmental Management (EM)

    VOLUME 1: IMPACT ANALYSES JULY 2015 DOE/EIS-0463 U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY WASHINGTON, DC Department of Energy Washington, DC 20585 July 2015 Dear Sir/Madam: Enclosed for your review and comment is the Draft Northern Pass Transmission Line Project Environmental Impact Statement (DOE/EIS-0463) prepared by the Department of Energy (DOE) pursuant to the National Environmental Policy Act of 1969 (NEPA) and its implementing regulations. The U.S.

  5. Advanced Flue Gas Desulfurization (AFGD) demonstration project: Volume 2, Project performance and economics. Final technical report

    SciTech Connect (OSTI)

    1996-04-30

    The project objective is to demonstrate removal of 90--95% or more of the SO{sub 2} at approximately one-half the cost of conventional scrubbing technology; and to demonstrate significant reduction of space requirements. In this project, Pure Air has built a single SO{sub 2} absorber for a 528-MWe power plant. The absorber performs three functions in a single vessel: prequencher, absorber, and oxidation of sludge to gypsum. Additionally, the absorber is of a co- current design, in which the flue gas and scrubbing slurry move in the same direction and at a relatively high velocity compared to conventional scrubbers. These features all combine to yield a state- of-the-art SO{sub 2} absorber that is more compact and less expensive than conventional scrubbers. The project incorporated a number of technical features including the injection of pulverized limestone directly into the absorber, a device called an air rotary sparger located within the base of the absorber, and a novel wastewater evaporation system. The air rotary sparger combines the functions of agitation and air distribution into one piece of equipment to facilitate the oxidation of calcium sulfite to gypsum. Additionally, wastewater treatment is being demonstrated to minimize water disposal problems inherent in many high-chloride coals. Bituminous coals primarily from the Indiana, Illinois coal basin containing 2--4.5% sulfur were tested during the demonstration. The Advanced Flue Gas Desulfurization (AFGD) process has demonstrated removal of 95% or more of the SO{sub 2} while providing a commercial gypsum by-product in lieu of solid waste. A portion of the commercial gypsum is being agglomerated into a product known as PowerChip{reg_sign} gypsum which exhibits improved physical properties, easier flowability and more user friendly handling characteristics to enhance its transportation and marketability to gypsum end-users.

  6. Wind-electric icemaking project: Analysis and dynamometer testing. Volume 1

    SciTech Connect (OSTI)

    Holz, R.; Gervorgian, V.; Drouilhet, S.; Muljadi, E.

    1998-07-01

    The wind/hybrid systems group at the National Renewable Energy Laboratory has been researching the most practical and cost-effective methods for producing ice from off-grid wind-electric power systems. The first phase of the project, conducted in 1993--1994, included full-scale dynamometer and field testing of two different electric ice makers directly connected to a permanent magnet alternator. The results of that phase were encouraging and the second phase of the project was launched in which steady-state and dynamic numerical models of these systems were developed and experimentally validated. The third phase of the project was the dynamometer testing of the North Star ice maker, which is powered by a 12-kilowatt Bergey Windpower Company, Inc., alternator. This report describes both the second and third project phases. Also included are detailed economic analyses and a discussion of the future prospects of wind-electric ice-making systems. The main report is contained in Volume 1. Volume 2 consists of the report appendices, which include the actual computer programs used in the analysis and the detailed test results.

  7. 1980 survey and evaluation of utility conservation, load management, and solar end-use projects. Volume 3: utility load management projects. Final report

    SciTech Connect (OSTI)

    Not Available

    1982-01-01

    The results of the 1980 survey of electric utility-sponsored energy conservation, load management, and end-use solar energy conversion projects are described. The work is an expansion of a previous survey and evaluation and has been jointly sponsored by EPRI and DOE through the Oak Ridge National Laboratory. There are three volumes and a summary document. Each volume presents the results of an extensive survey to determine electric utility involvement in customer-side projects related to the particular technology (i.e., conservation, solar, or load management), selected descriptions of utility projects and results, and first-level technical and economic evaluations.

  8. Data base on dose reduction research projects for nuclear power plants. Volume 5

    SciTech Connect (OSTI)

    Khan, T.A.; Yu, C.K.; Roecklein, A.K.

    1994-05-01

    This is the fifth volume in a series of reports that provide information on dose reduction research and health physics technology or nuclear power plants. The information is taken from two of several databases maintained by Brookhaven National Laboratory`s ALARA Center for the Nuclear Regulatory Commission. The research section of the report covers dose reduction projects that are in the experimental or developmental phase. It includes topics such as steam generator degradation, decontamination, robotics, improvements in reactor materials, and inspection techniques. The section on health physics technology discusses dose reduction efforts that are in place or in the process of being implemented at nuclear power plants. A total of 105 new or updated projects are described. All project abstracts from this report are available to nuclear industry professionals with access to a fax machine through the ACEFAX system or a computer with a modem and the proper communications software through the ACE system. Detailed descriptions of how to access all the databases electronically are in the appendices of the report.

  9. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1994-01-01

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

  10. ASEAN-USAID buildings energy conservation project. Volume 1, Energy standards: Final report

    SciTech Connect (OSTI)

    Levine, M.D.; Busch, J.F.; Deringer, J.J.

    1992-06-01

    Mandatory or voluntary energy-efficiency standards for new or existing buildings can play an important role in a national program aimed at promoting energy conservation. Building codes and standards can provide a degree of control over design and building practices throughout the construction process, and encourage awareness of energy-conscious design. Studies in developed countries indicate that efficiency standards can produce energy reductions on the order of 20 to 40% or more. Within ASEAN, analyses of the savings potential from the proposed standards suggest that if implemented, these standards would produce savings over current new design practice of 19% to 24%. In this volume we provide an overview of the ASEAN-USAID project aimed at promulgating standards for energy efficiency in commercial buildings. The process of developing and implementing energy-efficiency standards for buildings can be subdivided into two key components: policy development; and technical and economic analysis. Each of these involves a number of steps and processes, as outlined in Figure 1-1. This volume describes the technical and economic analyses used to develop the proposed energy efficiency standards for four countries (Malaysia, Thailand, the Philippines, and Indonesia), and to refine an energy standard existing in Singapore since 1979. Though oriented toward the ASEAN region, the analysis methods described here are applicable in a range of settings, provided appropriate modifications are made for local building construction, climatic, economic, and political conditions. Implementation issues are not specifically addressed here; rather this volume is oriented towards the analytical work needed to establish or revise an energy standard for buildings.

  11. Inventory of Federal energy-related environment and safety research for FY 1979. Volume II. Project listings and indexes

    SciTech Connect (OSTI)

    1980-12-01

    This volume contains summaries of FY 1979 government-sponsored environment and safety research related to energy arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each contributing agency. Information elements included in the summary listings are project title, principal investigators, research organization, project number, contract number, supporting organization, funding level, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in the back of this volume.

  12. Renewable Resources: a national catalog of model projects. Volume 2. Mid-American Solar Energy Complex Region

    SciTech Connect (OSTI)

    1980-07-01

    This compilation of diverse conservation and renewable energy projects across the United States was prepared through the enthusiastic participation of solar and alternate energy groups from every state and region. Compiled and edited by the Center for Renewable Resources, these projects reflect many levels of innovation and technical expertise. In many cases, a critique analysis is presented of how projects performed and of the institutional conditions associated with their success or failure. Some 2000 projects are included in this compilation; most have worked, some have not. Information about all is presented to aid learning from these experiences. The four volumes in this set are arranged in state sections by geographic region, coinciding with the four Regional Solar Energy Centers. The table of contents is organized by project category so that maximum cross-referencing may be obtained. This volume includes information on the Mid-American Solar Energy Complex Region. (WHK)

  13. Assessment of the components of the Kalimantan and Sulawesi power development project: Volume 2. Export trade information

    SciTech Connect (OSTI)

    NONE

    1998-03-31

    This report, conducted by Utility Consulting was funded by the US Trade and Development Agency. The report concerns a power development project on the islands of Kalimantan and Sulawesi. This is TDA Volume 2, the main text (Report Volume 1), and it includes the following: (1) Introduction; (2) Transmission line and substation investment plan; (3) The distribution component; (4) Telecommunications; (5) PLN information systems; and Appendix: Figures and tables.

  14. Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 4: Project cost estimate

    SciTech Connect (OSTI)

    1995-09-01

    The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. This volume represents the total estimated costs for the W113 facility. Operating Contractor Management costs have been incorporated as received from WHC. The W113 Facility TEC is $19.7 million. This includes an overall project contingency of 14.4% and escalation of 17.4%. A January 2001 construction contract procurement start date is assumed.

  15. Confined zone dispersion flue gas desulfurization demonstration. Volume 1, Quarterly report No. 4, August 1, 1991--October 31, 1991

    SciTech Connect (OSTI)

    Not Available

    1992-02-27

    The confined zone dispersion (CZD) process involves flue gas post-treatment, physically located between a boiler`s outlet and its particulate collector, which in the majority of cases is an electrostatic precipitator. The features that distinguish this process from other similar injection processes are: Injection of an alkaline slurry directly into the duct, instead of injection of dry solids into the duct ahead of a fabric filter. Use of an ultrafine calcium/magnesium hydroxide, type S pressure-hydrated dolomitic lime. This commercial product is made from plentiful, naturally occurring dolomite. Low residence time, made possible by the high effective surface area of the Type S lime. Localized dispersion of the reagent. Slurry droplets contact only part of the gas while the droplets are drying, to remove up to 50 percent of the S0{sub 2} and significant amounts of NO{sub x}. The process uses dual fluid rather than rotary atomizers. Improved electrostatic precipitator performance via gas conditioning from the increased water vapor content, and lower temperatures. Supplemental conditioning with S0{sub 3} is not believed necessary for satisfactory removal of particulate matter.

  16. A Research Needs Assessment for waste plastics recycling: Volume 2, Project report. Final report

    SciTech Connect (OSTI)

    1994-12-01

    This second volume contains detailed information on a number of specific topics relevant to the recovery/recycling of plastics.

  17. Recovery Efficiency Test Project Phase 2 activity report, Volume 1. Final report

    SciTech Connect (OSTI)

    Overbey, W.K. Jr.; Salamy, S.P.; Locke, C.D.

    1989-02-01

    The purpose of Phase II operations of the Recovery Efficiency Test Project is to enhance the natural production of the well and evaluate the relative improvement as a function of the type of stimulation conducted. Another purpose is to compare the stimulated production performance of the horizontal well with vertical wells in the field. The objectives considered for Phase II operations and plans were: (1) Develop a rationale for a systematic approach to designing stimulations for the well. (2) Conduct a series of stimulations designed to optimize the fluids, injection rates, proppant volumes and general approach to stimulating a horizontal well with similar geologic conditions. (3) Develop and test a method or methods for determining the geometry of stimulation-induced fractures. (4) Conduct tests and analyze the results to determine the efficiency of stimulation operations. The technical approach pursued in developing plans to accomplish three objectives was to: (1) Review the data needs for all objectives and obtain that data first. (2) Identify the operating geologic, geomechanical, and reservoir parameters that need additional clarification or definition. (3) Investigate existing models which could be used to plan or evaluate stimulation on the well and the reservoir. (4) Plan for analysis and verification of models and approaches.

  18. Recovery efficiency test project, Phase 2 activity report. Volume 2, Final report

    SciTech Connect (OSTI)

    Overbey, W.K. Jr.; Salamy, S.P.; Locke, C.D.

    1989-02-01

    The Recovery Efficiency Test well project addressed a number of technical issues. The primary objective was to determine the increased efficiency of gas recovery of a long horizontal wellbore over that of a vertical wellbore and, more specifically, what improvements can be expected from inducing multiple hydraulic fractures from such a wellbore. This volume contains appendices for: (1) supporting material and procedures for ``data frac`` stimulation of zone 6 using nitrogen and nitrogen foam; (2) supporting material and procedures for stimulation no. 1 nitrogen gas frac on zone no. 1; (3) supporting material and procedures for stimulation no. 2 in zone no. 1 using liquid CO{sub 2}; (4) supporting material and procedures for frac no. 3 on zone no.1 using nitrogen foam and proppant; (5) supporting material and procedures for stimulation no. 4 in zones 2--3 and 4 using nitrogen foam and proppant; (6) supporting materials and procedures for stimulation no. 5 in zones 5 and 8; and (7) fracture diagnostics reports and supporting materials.

  19. The ADVANCE project: Formal evaluation of the targeted deployment. Volume 1

    SciTech Connect (OSTI)

    NONE

    1997-01-01

    The Advanced Driver and Vehicle Advisory Navigation ConcEpt (ADVANCE) was an invehicle advanced traveler information system (ATIS) that operated in the northwest suburbs of Chicago, Illinois. It was designed to provide origin-destination shortest-time route guidance to a vehicle based on (a) an on-board static (fixed) data base of average network link travel times by time of day, combined as available and appropriate with (b) dynamic (real-time) information on traffic conditions provided by radio frequency (RF) communications to and from a traffic information center (TIC). Originally conceived in 1990 as a major project that would have installed 3,000 to 5,000 route guidance units in privately owned vehicles throughout the test area, ADVANCE was restructured in 1995 as a {open_quotes}targeted deployment,{close_quotes} in which approximately 80 vehicles were to be equipped with the guidance units - Mobile Navigation Assistants (MNAs) - to be in full communication with the TIC while driving the ADVANCE test area road system. Volume one consists of the evaluation managers overview report, and several appendices containing test results.

  20. Surface Environmental Surveillance Project: Locations Manual Volume 1 Air and Water Volume 2 Farm Products, Soil & Vegetation, and Wildlife

    SciTech Connect (OSTI)

    Fritz, Brad G.; Patton, Gregory W.; Stegen, Amanda; Poston, Ted M.

    2009-01-01

    This report describes all environmental monitoring locations associated with the Surface Environmental Surveillance Project. Environmental surveillance of the Hanford site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 450.1, Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The environmental surveillance sampling design is described in the Hanford Site Environmental Monitoring Plan, United States Department of Energy, Richland Operation Office (DOE/RL-91-50). This document contains the locations of sites used to collect samples for the Surface Environmental Surveillance Project (SESP). Each section includes directions, maps, and pictures of the locations. A general knowledge of roads and highways on and around the Hanford Site is necessary to successfully use this manual. Supplemental information (Maps, Gazetteer, etc.) may be necessary if user is unfamiliar with local routes. The SESP is a multimedia environmental surveillance effort to measure the concentrations of radionuclides and chemicals in environmental media to demonstrate compliance with applicable environmental quality standards and public exposure limits, and assessing environmental impacts. Project personnel annually collect selected samples of ambient air, surface water, agricultural products, fish, wildlife, and sediments. Soil and vegetation samples are collected approximately every 5 years. Analytical capabilities include the measurement of radionuclides at very low environmental concentrations and, in selected media, nonradiological chemicals including metals, anions, volatile organic compounds, and total organic carbon.

  1. New England Wind Forum: A Wind Powering America Project Volume 1, Issue 3 -- October 2007

    SciTech Connect (OSTI)

    2009-02-26

    Newsletter featuring the latest developments throughout New England in wind power policy, project development, and markets.

  2. New England Wind Forum: A Wind Powering America Project Volume 1, Issue 4 -- May 2008

    SciTech Connect (OSTI)

    2009-02-26

    Newsletter featuring the latest developments throughout New England in wind power policy, project development, and markets.

  3. PHMC Year 2000: Status reporting for mission essential Year 2000 projects. Revision 0, Volume 3

    SciTech Connect (OSTI)

    Layfield, K.A.

    1998-09-02

    The PHMC Year 2000 status reporting process is designed to encompass the reporting requirements of the Office of Management and Budget (OMB), DOE HQ, RL and the PHMC for mission essential Year 2000 projects. Status reporting is required for all Year 2000 projects. The Year 2000 project list will be maintained current as Year 2000 projects are modified, added or deleted. Reporting is required until a Year 2000 project has completed compliance assurance. Some projects will be identified as DOE HQ reportable. These are projects determined to be the most critical and due the attention of DOE HQ.

  4. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    SciTech Connect (OSTI)

    Not Available

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  5. Project W-320, 241-C-106 sluicing: Civil/structural calculations. Volume 1

    SciTech Connect (OSTI)

    Bailey, J.W.

    1998-07-28

    This supporting document has been prepared to make the FDNW civil/structural calculations for Project W-320 readily retrievable.

  6. Project W-320, 241-C-106 sluicing: Piping calculations. Volume 5

    SciTech Connect (OSTI)

    Bailey, J.W.

    1998-07-24

    This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable.

  7. Project W-320, 241-C-106 sluicing: Civil/structural calculations. Volume 8

    SciTech Connect (OSTI)

    Bailey, J.W.

    1998-07-23

    This supporting document has been prepared to make the FDNW civil/structural calculations for Project W-320 readily retrievable.

  8. Project W-320, 241-C-106 sluicing: Piping calculations. Volume 3

    SciTech Connect (OSTI)

    Bailey, J.W.

    1998-07-25

    This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable.

  9. Breckinridge Project, initial effort. Report XI, Volume V. Critical review of the design basis. [Critical review

    SciTech Connect (OSTI)

    1982-01-01

    Report XI, Technical Audit, is a compendium of research material used during the Initial Effort in making engineering comparisons and decisions. Volumes 4 and 5 of Report XI present those studies which provide a Critical Review of the Design Basis. The Critical Review Report, prepared by Intercontinental Econergy Associates, Inc., summarizes findings from an extensive review of the data base for the H-Coal process design. Volume 4 presents this review and assessment, and includes supporting material; specifically, Design Data Tabulation (Appendix A), Process Flow Sheets (Appendix B), and References (Appendix C). Volume 5 is a continuation of the references of Appendix C. Studies of a proprietary nature are noted and referenced, but are not included in these volumes. They are included in the Limited Access versions of these reports and may be reviewed by properly cleared personnel in the offices of Ashland Synthetic Fuels, Inc.

  10. Water Resources Data. Ohio - Water Year 1992. Volume 1. Ohio River Basin excluding project data

    SciTech Connect (OSTI)

    H.L. Shindel; J.H. Klingler; J.P. Mangus; L.E. Trimble

    1993-03-01

    Water-resources data for the 1992 water year for Ohio consist of records of stage, discharge, and water quality of streams; stage and contents of lakes and reservoirs; and water levels and water quality of ground-water wells. This report, in two volumes, contains records for water discharge at 121 gaging stations, 336 wells, and 72 partial-record sites; and water levels at 312 observation wells. Also included are data from miscellaneous sites. Additional water data were collected at various sites not involved in the systematic data-collection program and are published as miscellaneous measurements and analyses. These data represent that part of the National Water Data System collected by the US Geological Survey and cooperating State and Federal agencies in Ohio. Volume 1 covers the central and southern parts of Ohio, emphasizing the Ohio River Basin. (See Order Number DE95010451 for Volume 2 covering the northern part of Ohio.)

  11. New England Wind Forum: A Wind Powering America Project, Volume 1, Issue 4 -- May 2008 (Newsletter)

    SciTech Connect (OSTI)

    Grace, R. C.; Gifford, J.

    2008-05-01

    The New England Wind Forum electronic newsletter summarizes the latest news in wind energy development activity, markets, education, and policy in the New England region. It also features an interview with a key figure influencing New England's wind energy development. Volume 1, Issue 4 features an interview with Brian Fairbank, president and CEO of Jiminy Peak Mountain Resort.

  12. Validation of a 4D-PET Maximum Intensity Projection for Delineation of an Internal Target Volume

    SciTech Connect (OSTI)

    Callahan, Jason; Kron, Tomas; Peter MacCallum Department of Oncology, The University of Melbourne, Melbourne ; Schneider-Kolsky, Michal; Dunn, Leon; Thompson, Mick; Siva, Shankar; Aarons, Yolanda; Peter MacCallum Department of Oncology, The University of Melbourne, Melbourne ; Binns, David; Hicks, Rodney J.; Peter MacCallum Department of Oncology, The University of Melbourne, Melbourne

    2013-07-15

    Purpose: The delineation of internal target volumes (ITVs) in radiation therapy of lung tumors is currently performed by use of either free-breathing (FB) {sup 18}F-fluorodeoxyglucose-positron emission tomography-computed tomography (FDG-PET/CT) or 4-dimensional (4D)-CT maximum intensity projection (MIP). In this report we validate the use of 4D-PET-MIP for the delineation of target volumes in both a phantom and in patients. Methods and Materials: A phantom with 3 hollow spheres was prepared surrounded by air then water. The spheres and water background were filled with a mixture of {sup 18}F and radiographic contrast medium. A 4D-PET/CT scan was performed of the phantom while moving in 4 different breathing patterns using a programmable motion device. Nine patients with an FDG-avid lung tumor who underwent FB and 4D-PET/CT and >5 mm of tumor motion were included for analysis. The 3 spheres and patient lesions were contoured by 2 contouring methods (40% of maximum and PET edge) on the FB-PET, FB-CT, 4D-PET, 4D-PET-MIP, and 4D-CT-MIP. The concordance between the different contoured volumes was calculated using a Dice coefficient (DC). The difference in lung tumor volumes between FB-PET and 4D-PET volumes was also measured. Results: The average DC in the phantom using 40% and PET edge, respectively, was lowest for FB-PET/CT (DCAir = 0.72/0.67, DCBackground 0.63/0.62) and highest for 4D-PET/CT-MIP (DCAir = 0.84/0.83, DCBackground = 0.78/0.73). The average DC in the 9 patients using 40% and PET edge, respectively, was also lowest for FB-PET/CT (DC = 0.45/0.44) and highest for 4D-PET/CT-MIP (DC = 0.72/0.73). In the 9 lesions, the target volumes of the FB-PET using 40% and PET edge, respectively, were on average 40% and 45% smaller than the 4D-PET-MIP. Conclusion: A 4D-PET-MIP produces volumes with the highest concordance with 4D-CT-MIP across multiple breathing patterns and lesion sizes in both a phantom and among patients. Freebreathing PET/CT consistently underestimates ITV when compared with 4D PET/CT for a lesion affected by respiration.

  13. Great Northern Transmission Line Project Draft Environmental Impact Statement_Volume II

    Office of Environmental Management (EM)

    O Agricultural Impact Mitigation Plan (AIMP) Example ITCM Minnesota - Iowa 345 kV Transmission Line Project: Final Environmental Impact Statement Appendix O Agricultural Impact Mitigation Plan O-1 ITC Midwest LLC Agricultural Impact Mitigation Plan Minnesota - Iowa 345 kV Transmission Project and Associated Facilities in Jackson, Martin, and Faribault Counties Docket Nos. ET6675/CN-12-1053 & ET6675/TL-12-1337 April 29, 2014 ITC Midwest's DEIS Comment Letter E X A M P L E ITCM Minnesota -

  14. Final report on the Background Soil Characterization Project at the Oak Ridge Reservation, Oak Ridge, Tennessee. Volume 3: Project Plan

    SciTech Connect (OSTI)

    Hatmaker, T.L.; Hook, L.A.; Jackson, B.L.

    1993-10-01

    The Background Soil Characterization Project (BSCP) will provide background concentration levels of selected metals, organic compounds, and radionuclides in soils from uncontaminated on-site areas at the Oak Ridge Reservation (ORR), and off-site in the western part of Roane County and the eastern part of Anderson County. The BSCP will establish a database, recommend how to use the data for contaminated site assessment, and provide estimates of the potential human health and environmental risks associated with the background level concentrations of potentially hazardous constituents. ORR background soil characterization data will be used for two purposes. The first application will be in differentiating between naturally occurring constituents and site-related contamination. This is a very important step in a risk assessment because if sufficient background data are not available, no constituent known to be a contaminant can be eliminated from the assessment even if the sampled concentration is measured at a minimum level. The second use of the background data will be in calculating baseline risks against which site-specific contamination risks can be compared.

  15. Water Resources Data Ohio: Water year 1994. Volume 1, Ohio River Basin excluding Project Data

    SciTech Connect (OSTI)

    1994-12-31

    The Water Resources Division of the US Geological Survey (USGS) in cooperation with State agencies, obtains a large amount of data each water year (a water year is the 12-month period from October 1 through September 30 and is identified by the calendar year in which it ends) pertaining to the water resources of Ohio. These data, accumulated during many years, constitute a valuable data base for developing an improved understanding of the water resources of the State. To make these data readily available to interested parties outside the USGS, they are published annually in this report series entitled ``Water Resources Data--Ohio.`` This report (in two volumes) includes records on surface water and ground water in the State. Specifically, it contains: (1) Discharge records for streamflow-gaging stations, miscellaneous sites, and crest-stage stations; (2) stage and content records for streams, lakes, and reservoirs; (3) water-quality data for streamflow-gaging stations, wells, synoptic sites, and partial-record sit -aid (4) water-level data for observation wells. Locations of lake-and streamflow-gaging stations, water-quality stations, and observation wells for which data are presented in this volume are shown in figures 8a through 8b. The data in this report represent that part of the National Water Data System collected by the USGS and cooperating State and Federal agencies in Ohio. This series of annual reports for Ohio began with the 1961 water year with a report that contained only data relating to the quantities of surface water. For the 1964 water year, a similar report was introduced that contained only data relating to water quality. Beginning with the 1975 water year, the report was changed to present (in two or three volumes) data on quantities of surface water, quality of surface and ground water, and ground-water levels.

  16. Breckinridge Project, initial effort. Report VII, Volume 4. Safety and health plan

    SciTech Connect (OSTI)

    none,

    1982-01-01

    The Safety and Health Plan recognizes the potential hazards associated with the Project and has been developed specifically to respond to these risks in a positive manner. Prevention, the primary objective of the Plan, starts with building safety controls into the process design and continues through engineering, construction, start-up, and operation of the Project facilities and equipment. Compliance with applicable federal, state, and local health and safety laws, regulations, and codes throughout all Project phases is required and assured. The Plan requires that each major Project phase be thoroughly reviewed and analyzed to determine that those provisions required to assure the safety and health of all employees and the public, and to prevent property and equipment losses, have been provided. The Plan requires followup on those items or situations where corrective action needs were identified to assure that the action was taken and is effective. Emphasis is placed on loss prevention. Exhibit 1 provides a breakdown of Ashland Synthetic Fuels, Inc.'s (ASFI's) Loss Prevention Program. The Plan recognizes that the varied nature of the work is such as to require the services of skilled, trained, and responsible personnel who are aware of the hazards and know that the work can be done safely, if done correctly. Good operating practice is likewise safe operating practice. Training is provided to familiarize personnel with good operational practice, the general sequence of activities, reporting requirements, and above all, the concept that each step in the operating procedures must be successfully concluded before the following step can be safely initiated. The Plan provides for periodic review and evaluation of all safety and loss prevention activities at the plant and departmental levels.

  17. Project W-320, 241-C-106 sluicing HVAC calculations, Volume 1

    SciTech Connect (OSTI)

    Bailey, J.W.

    1998-08-07

    This supporting document has been prepared to make the FDNW calculations for Project W-320, readily retrievable. The report contains the following calculations: Exhaust airflow sizing for Tank 241-C-106; Equipment sizing and selection recirculation fan; Sizing high efficiency mist eliminator; Sizing electric heating coil; Equipment sizing and selection of recirculation condenser; Chiller skid system sizing and selection; High efficiency metal filter shielding input and flushing frequency; and Exhaust skid stack sizing and fan sizing.

  18. Great Northern Transmission Line Project Draft Environmental Impact Statement_Volume I

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement 7.0 Cumulative and Other Impacts 7.2.1 Past Actions Past actions are those actions and their associated impacts that occurred within or influenced the geographic region of influence (ROI) of each resource and have shaped the current affected environment of the proposed Project area. For the purposes of this Environmental Impact Statement (EIS), actions that have occurred in the past and their associated impacts are now part of the existing environment and are

  19. Draft New England Clean Power Link Project Environmental Impact Statement Volume I

    Office of Environmental Management (EM)

    (http://wamc/files/styles/default/public/201410/new-england-clean-power-link-map- ctsy-tdi-new-england.jpg" alt="">) 2. NECPL exit from Lake Champlain (Benson, Vermont) courtesy of TDI-NE 3. Lake Bomoseen, Fair Haven, Vermont courtesy of TDI-NE 4. TDI-NE 2014a 1 3 2 4 Department of Energy Washington, DC 20585 June 2015 Dear Sir/Madam: Enclosed for your review and comment is the New England Clean Power Link Transmission Line Project Draft Environmental Impact Statement

  20. Site characterization report for the basalt waste isolation project. Volume II

    SciTech Connect (OSTI)

    1982-11-01

    The reference location for a repository in basalt for the terminal storage of nuclear wastes on the Hanford Site and the candidate horizons within this reference repository location have been identified and the preliminary characterization work in support of the site screening process has been completed. Fifteen technical questions regarding the qualification of the site were identified to be addressed during the detailed site characterization phase of the US Department of Energy-National Waste Terminal Storage Program site selection process. Resolution of these questions will be provided in the final site characterization progress report, currently planned to be issued in 1987, and in the safety analysis report to be submitted with the License Application. The additional information needed to resolve these questions and the plans for obtaining the information have been identified. This Site Characterization Report documents the results of the site screening process, the preliminary site characterization data, the technical issues that need to be addressed, and the plans for resolving these issues. Volume 2 contains chapters 6 through 12: geochemistry; surface hydrology; climatology, meteorology, and air quality; environmental, land-use, and socioeconomic characteristics; repository design; waste package; and performance assessment.

  1. Geotechnical characterization of the North Ramp of the Exploratory Studies Facility: Yucca Mountain Site Characterization Project. Volume 1, Data summary

    SciTech Connect (OSTI)

    Brechtel, C.E.; Lin, Ming; Martin, E.; Kessel, D.S.

    1995-05-01

    This report presents the results of geological and geotechnical characterization of the Miocene volcanic tuff rocks of the Timber Mountain and Paintbrush groups that the tunnel boring machine will encounter during excavation of the Exploratory Studies Facility (ESF) North Ramp. The is being constructed by the DOE as part of the Yucca Mountain Project site characterization activities. The purpose of these activities is to evaluate the feasibility of locating a potential high-level nuclear waste repository on lands adjacent to the Nevada Test Site, Nye County, Nevada. This report was prepared as part of the Soil and Rock Properties Studies in accordance with the 8.3.1.14.2 Study Plan. This report is volume 1 of the data summary.

  2. SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 5. Science Applications, Incorporated system requirements definition

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    This report sets forth the system requirements for a Solar Controlled-Environment Agriculture System (SCEAS) Project. In the report a conceptual baseline system description for an engineering test facility is given. This baseline system employs a fluid roof/roof filter in combination with a large storage tank and a ground water heat exchanger in order to provide cooling and heating as needed. Desalination is accomplished by pretreatment followed by reverse osmosis. Energy is provided by means of photovoltaics and wind machines in conjunction with storage batteries. Site and climatic data needed in the design process are given. System performance specifications and integrated system design criteria are set forth. Detailed subsystem design criteria are presented and appropriate references documented.

  3. Project W-320, 241-C-106 sluicing: Piping calculations. Volume 4

    SciTech Connect (OSTI)

    Bailey, J.W.

    1998-07-24

    This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable. The objective of this calculation is to perform the structural analysis of the Pipe Supports designed for Slurry and Supernate transfer pipe lines in order to meet the requirements of applicable ASME codes. The pipe support design loads are obtained from the piping stress calculations W320-27-I-4 and W320-27-I-5. These loads are the total summation of the gravity, pressure, thermal and seismic loads. Since standard typical designs are used for each type of pipe support such as Y-Stop, Guide and Anchors, each type of support is evaluated for the maximum loads to which this type of supports are subjected. These loads are obtained from the AutoPipe analysis and used to check the structural adequacy of these supports.

  4. Breckinridge Project, initial effort. Report VII, Volume II. Environmental baseline report

    SciTech Connect (OSTI)

    1982-01-01

    Ashland Synthetic Fuels, Inc. (ASFI) and Airco Energy Company, Inc. (AECI) have recently formed the Breckinridge Project and are currently conducting a process and economic feasibility study of a commercial scale facility to produce synthetic liquid fuels from coal. The coal conversion process to be used is the H-COAL process, which is in the pilot plant testing stage under the auspices of the US Department of Energy at the H-COAL Pilot Plant Project near Catlettsburg, Kentucky. The preliminary plans for the commercial plant are for a 18,140 metric ton/day (24,000 ton/day) nominal coal assumption capacity utilizing the abundant high sulfur Western Kentucky coals. The Western Kentucky area offers a source of the coal along with adequate water, power, labor, transportation and other factors critical to the successful siting of a plant. Various studies by federal and state governments, as well as private industry, have reached similar conclusions regarding the suitability of such plant sites in western Kentucky. Of the many individual sites evaluated, a site in Breckinridge County, Kentucky, approximately 4 kilometers (2.5 miles) west of the town of Stephensport, has been identified as the plant location. Actions have been taken to obtain options to insure that this site will be available when needed. This report contains an overview of the regional setting and results of the baseline environmental studies. These studies include collection of data on ambient air and water quality, sound, aquatic and terrestrial biology and geology. This report contains the following chapters; introduction, review of significant findings, ambient air quality monitoring, sound, aquatic ecology, vegetation, wildlife, geology, soils, surface water, and ground water.

  5. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 1, Summary

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western`s power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western`s firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action altemative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  6. Electric and Magnetic Fields (EMF) RAPID Program Engineering Project 8: FINAL REPORT, Evaluation of Field Reduction Technologies, Volume 1 (Report) and Volume 2 (Appendices)

    SciTech Connect (OSTI)

    Commonwealth Associates, Inc.; IIT Research Institute

    1997-08-01

    This draft report consists of two volumes. Volume 1, the main body, contains an introducto~ sectionj an overview of magnetic fields sectio~ and field reduction technology evaluation section. Magnetic field reduction methods are evalpated for transmission lines, distribution Iines,sulxtations, building wiring applkmd machinery, and transportation systems. The evaluation considers effectiveness, co% and other ftiors. Volume 2 contains five appendices, Append~ A presents magnetic field shielding information. Appendices B and C present design assumptions and magnetic field plots for transmission and distribution lines, respectively. Appendices D and E present cost estimate details for transmission and distribution limes, respectively.

  7. FY 2013 Volume 4

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 DOE/CF-0074 Volume 4 Science Advanced Research Projects Agency-Energy Department of Energy FY 2013 Congressional Budget Request February 2012 Office of Chief Financial Officer Volume 4 DOE/CF-0074 Volume 4 Science Advanced Research Projects Agency-Energy Printed with soy ink on recycled paper Department of Energy FY 2013 Congressional Budget Request Science Advanced Research Projects Agency- Energy Science Advanced Research Projects Agency- Energy Department of Energy/Science/ Advanced

  8. TVA coal-gasification commercial demonstration plant project. Volume 5. Plant based on Koppers-Totzek gasifier. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-11-01

    This volume presents a technical description of a coal gasification plant, based on Koppers-Totzek gasifiers, producing a medium Btu fuel gas product. Foster Wheeler carried out a conceptual design and cost estimate of a nominal 20,000 TPSD plant based on TVA design criteria and information supplied by Krupp-Koppers concerning the Koppers-Totzek coal gasification process. Technical description of the design is given in this volume.

  9. Computational mechanics research and support for aerodynamics and hydraulics at TFHRC, year 1 quarter 3 progress report.

    SciTech Connect (OSTI)

    Lottes, S.A.; Kulak, R.F.; Bojanowski, C.

    2011-08-26

    The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. The analysis methods employ well-benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water loads on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to assess them for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, vehicle stability under high wind loading, and the use of electromagnetic shock absorbers to improve vehicle stability under high wind conditions. This quarterly report documents technical progress on the project tasks for the period of April through June 2011.

  10. Materials and process engineering projects for the Sandia National Laboratories/Newly Independent States Industrial Partnering Program. Volume 1

    SciTech Connect (OSTI)

    Zanner, F.J.; Moffatt, W.C.

    1995-07-01

    In July, 1994, a team of materials specialists from Sandia and U S Industry traveled to Russia and the Ukraine to select and fund projects in materials and process technology in support of the Newly Independent States/Industrial Partnering Program (NIS/IPP). All of the projects are collaborations with scientists and Engineers at NIS Institutes. Each project is scheduled to last one year, and the deliverables are formatted to supply US Industry with information which will enable rational decisions to be made regarding the commercial value of these technologies. This work is an unedited interim compilation of the deliverables received to date.

  11. Materials and process engineering projects for the Sandia National Laboratories/Newly Independent States Industrial Partnering Program. Volume 2

    SciTech Connect (OSTI)

    Zanner, F.J.; Moffatt, W.C.

    1995-07-01

    In July, 1994, a team of materials specialists from Sandia and US. Industry traveled to Russia and the Ukraine to select and fund projects in materials and process technology in support of the Newly Independent States/Industrial Partnering Program (NIS/IPP). All of the projects are collaborations with scientists and Engineers at NIS Institutes. Each project is scheduled to last one year, and the deliverables are formatted to supply US. Industry with information which will enable rational decisions to be made regarding the commercial value of these technologies. This work is an unedited interim compilation of the deliverables received to date.

  12. CO-operation development project for new treatment of steam generator's - impact on final disposal volumes and recycling in Northern Europe

    SciTech Connect (OSTI)

    Wirendal, B.O.; Lindstrom, A.; Lindberg, M.; Hansson, T.

    2007-07-01

    This paper describes a real case of cost effective volume reduction of a retired, full size SG removed from the Ringhals Nuclear Power Plant, Sweden. The project is described from the first step of fulfilling the demands from the authorities before treatment to the results of the treatment. The evaluations of the method is also included and compared to the other possibilities and the driving forces that work in favour of our method. The waste owners' strategy is also described in this paper. Finally is the method of treatment described as a principle as well as the results. Technical details as well as detailed results are given in Paper 7131 [ref 1]. (authors)

  13. Ecological evaluation of proposed discharge of dredged material from Oakland Harbor into ocean waters (Phase 3 B of -42-foot project). Volume 1, Analyses and discussion

    SciTech Connect (OSTI)

    Kohn, N.P.; Ward, J.A.; Mayhew, H.L.; Word, J.Q.; Barrows, E.S.; Goodwin, S.M.; Lefkovitz, L.F.

    1992-06-01

    The Water Resources Development Act of 1986 (Public Law 99-662) authorized the US Army Corps of Engineers (USACE) San Francisco District, to deepen and widen the navigational channels of the Oakland Inner and Outer Harbors to accomodate deeper-draft vessels. The USACE is considering several disposal options for the dredged material removed during these channel improvements including open-water disposal. Dredged material proposed for open-water disposal must be evaluated to determine the potential impacts of the disposal activity on the water column and disposal site enviromments. The USACE requested that Battelle/Marine Sciences Laboratory (MSL) conduct studies to evaluate open-water disposal options for Oakland Harbor sediments. This request developed into the Oakland Harbor Phase III Program. This is Volume 1 of a two-volume report that presents information gathered to determine the suitability of ocean disposal of sediments dredged from Oakland Harbor. This volume contains project background, materials and methods, results, discussion, and conclusions.

  14. Wadter Resources Data Ohio: Water year 1994. Volume 2, St. Lawrence River Basin and Statewide Project Data

    SciTech Connect (OSTI)

    1994-12-31

    The Water Resources Division of the US Geological Survey (USGS), in cooperation with State agencies, obtains a large amount of data each water year (a water year is the 12-month period from October 1 through September 30 and is identified by the calendar year in which it ends) pertaining to the water resources of Ohio. These data, accumulated during many years, constitute a valuable data base for developing an improved understanding of the water resources of the State. To make these data readily available to interested parties outside the USGS, they are published annually in this report series entitled ``Water Resources Data--Ohio.`` This report (in two volumes) includes records on surface water and ground water in the State. Specifically, it contains: (1) Discharge records for streamflow-gaging stations, miscellaneous sites, and crest-stage stations; (2) stage and content records for streams, lakes, and reservoirs; (3) water-quality data for streamflow-gaging stations, wells, synaptic sites, and partial-record sites; and (4) water-level data for observation wells. Locations of lake- and streamflow-gaging stations, water-quality stations, and observation wells for which data are presented in this volume are shown in figures ga through 8b. The data in this report represent that part of the National Water Data System collected by the USGS and cooperating State and Federal agencies in Ohio. This series of annual reports for Ohio began with the 1961 water year with a report that contained only data relating to the quantities of surface water. For the 1964 water year, a similar report was introduced that contained only data relating to water quality. Beginning with the 1975 water year, the report was changed to present (in two to three volumes) data on quantities of surface water, quality of surface and ground water, and ground-water levels.

  15. Advanced system demonstration for utilization of biomass as an energy source. Volume I. Scope and design criteria and project summary

    SciTech Connect (OSTI)

    1980-10-01

    The information in this document is the result of an intensive engineering effort to demonstrate the feasibility of biomass-fueled boilers in cogeneration applications. This design package is based upon a specific site in the State of Maine. However, the design is generic in nature and could serve as a model for other biomass conversion facilities located anywhere biomass is abundant. The project's purpose and summary information are presented: the plant, its concept of operation; and other overall information are described. The capital cost estimate for the plant, and the basis upon which it was obtained are given; a schedule of key milestones and activities required to construct the plant and put it into operation is presented; and the general findings in areas that affect the viability of the project are discussed. The technical design, biomass study, environmental impact, commercialization, and economic factors are addressed. Each major plant area and the equipment and facilities that each includes are discussed in depth. Some overall plant requirements, including noise control, reliability, maintainability, and safety, are detailed. The results of each study relating to alternatives considered for optimizing plant operation parameters and specific system process schemes are briefly presented. All economic factors that affect the feasibility and viability of the biomass project are defined and evaluated.

  16. Alaska Regional Energy Resources Planning Project. Phase 2: coal, hydroelectric and energy alternatives. Volume I. Beluga Coal District Analysis

    SciTech Connect (OSTI)

    Rutledge, G.; Lane, D.; Edblom, G.

    1980-01-01

    This volume deals with the problems and procedures inherent in the development of the Beluga Coal District. Socio-economic implications of the development and management alternatives are discussed. A review of permits and approvals necessary for the initial development of Beluga Coal Field is presented. Major land tenure issues in the Beluga Coal District as well as existing transportation routes and proposed routes and sites are discussed. The various coal technologies which might be employed at Beluga are described. Transportation options and associated costs of transporting coal from the mine site area to a connecting point with a major, longer distance transportation made and of transporting coal both within and outside (exportation) the state are discussed. Some environmental issues involved in the development of the Beluga Coal Field are presented. (DMC)

  17. Projecting

    U.S. Energy Information Administration (EIA) Indexed Site

    Projecting the scale of the pipeline network for CO2-EOR and its implications for CCS ... for CO 2 -EOR and CO 2 transportation for CCS assuming a carbon price are discussed. ...

  18. Site characterization plan: Conceptual design report: Volume 4, Appendices F-O: Nevada Nuclear Waste Storage Investigations Project

    SciTech Connect (OSTI)

    MacDougall, H R; Scully, L W; Tillerson, J R

    1987-09-01

    The site for the prospective repository is located at Yucca Mountain in southwestern Nevada, and the waste emplacement area will be constructed in the underlying volcanic tuffs. The target horizon for waste emplacement is a sloping bed of densely welded tuff more than 650 ft below the surface and typically more than 600 ft above the water table. The conceptual design described in this report is unique among repository designs in that it uses ramps in addition to shafts to gain access to the underground facility, the emplacement horizon is located above the water table, and it is possible that 300- to 400-ft-long horizontal waste emplacement boreholes will be used. This report summarizes the design bases, design and performance criteria, and the design analyses performed. The current status of meeting the preclosure performance objectives for licensing and of resolving the repository design and preclosure issues is presented. The repository design presented in this report will be expanded and refined during the advanced conceptual design, the license application design, and the final procurement and construction design phases. Volume 4 contains Appendices F to O.

  19. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume II

    SciTech Connect (OSTI)

    1996-10-01

    Volume II of the programmatic environmental impact statement (PElS) is a comment and response document; it is the collection of the comments received on the draft PElS. The U.S. Department of Energy's (DOE) response to each comment is provided after each comment. If the comment resulted in a change to the PElS, the affected section number of the PElS is provided in the response. Comments 1 through 259 were received at public hearings. The name of the hearing at which the comment was received is listed after each comment. Comments were recorded on flip charts and by notetakers. DOE representatives were present to hear the comments and respond to them. The DOE's written response is provided after each comment. Comments 260 through 576 were received in writing at the hearings, and from various federal, tribal, and state agencies and from individuals during the public comment period. Copies of the written comments follow the comments and responses.

  20. Geotechnical characterization of the North Ramp of the Exploratory Studies Facility: Yucca Mountain Site Characterization Project. Volume 2, NRG corehole data appendices

    SciTech Connect (OSTI)

    Brechtel, C.E.; Lin, Ming; Martin, E.; Kessel, D.S.

    1995-05-01

    This report presents the results of the geological and geotechnical characterization of the Miocene volcanic tuff rocks of the Timber Mountain and Paintbrush groups that the tunnel boring machine will encounter during excavations of the Exploratory Studies Facility (ESF) North Ramp. The information in this report was developed to support the design of the ESF North Ramp. The ESF is being constructed by the DOE as part of the Yucca Mountain Project site characterization activities. The purpose of these activities is to evaluate the potential to locate the national high-level nuclear waste repository on land within and adjacent to the Nevada Test Site (NTS), Nye County, Nevada. This report was prepared as part of the Soil and Rock Properties Studies in accordance with the 8.3.1.14.2 Study Plan to Provide Soil and Rock Properties. This is volume 2 which contains NRG Corehole Data for each of the NRG Holes.

  1. Alkaline Waterflooding Demonstration Project, Ranger Zone, Long Beach Unit, Wilmington Field, California. Fourth annual report, June 1979-May 1980. Volume 3. Appendices II-XVII

    SciTech Connect (OSTI)

    Carmichael, J.D.

    1981-03-01

    Volume 3 contains Appendices II through XVII: mixing instructions for sodium orthosilicate; oil displacement studies using THUMS C-331 crude oil and extracted reservoir core material from well B-110; clay mineral analysis of B-827-A cores; sieve analysis of 4 Fo sand samples from B-110-IA and 4 Fo sand samples from B-827-A; core record; delayed secondary caustic consumption tests; long-term alkaline consumption in reservoir sands; demulsification study for THUMS Long Beach Company, Island White; operating plans and instructions for DOE injection demonstration project, alkaline injection; caustic pilot-produced water test graphs; well test irregularities (6/1/79-5/31/80); alkaline flood pump changes (6/1/79-5/31/80); monthly DOE pilot chemical waterflood injection reports (preflush injection, alkaline-salt injection, and alkaline injection without salt); and caustic safety procedures-alkaline chemicals.

  2. Sweet Lake geopressured-geothermal project, Magma Gulf-Technadril/DOE Amoco fee. Volume III. Final report. Annual report, February 1982-March 1985

    SciTech Connect (OSTI)

    Durham, C.O. Jr.; O'Brien, F.D.; Rodgers, R.W.

    1985-01-01

    This report presents the results of the testing of Sand 3 (15,245 to 15,280 feet in depth) which occurred from November 1983 to March 1984 and evaluates these new data in comparison to results from the testing of Sand 5 (15,385 to 15,415 feet in depth) which occurred from June 1981 to February 1982. It also describes the reworking of the production and salt water disposal wells preparatory to the Sand 3 testing as well as the plug and abandon procedures requested to terminate the project. The volume contains two parts: Part 1 includes the text and accompanying plates, figures and tables; Part 2 consists of the appendixes including auxiliary reports and tabulations.

  3. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 4, Appendixes B-D

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  4. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 3, Appendix A

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  5. Breckinridge Project, initial effort. Report VII, Volume I. Introduction and background. [Storage losses of 28 products and by-products

    SciTech Connect (OSTI)

    none,

    1982-01-01

    The proposed plant site consists of 1594 acres along the Ohio River in Breckinridge County, Kentucky. An option to purchase the site has been secured on behalf of the Breckinridge Project by the Commonwealth of Kentucky Department of Energy. Figure 1 is an area map locating the site with respect to area cities and towns. The nearest communities to the site are the hamlet of Stephensport, Kentucky, about 3-1/2 miles northeast and Cloverport, Kentucky, which is 6 miles to the southwest. The nearest major cities are Owensboro, Kentucky, 45 road miles to the west and Louisville, Kentucky, 65 miles to the northeast. The Breckinridge facility will convert about 23,000 TPD of run-of-mine (ROM) coal into a nominal 50,000 BPD of hydrocarbon liquids including a significant quantity of transportation fuels. Major products refined for marketing include pipeline gas, propane, butane, 105 RONC gasoline reformate, middle distillate and heavy distillate. By-products include sulfur, anhydrous ammonia, and commercial-grade phenol. Care is being taken to minimize the impact of the facility operations on the environment. Water and wastewater treatment systems have been designed to achieve zero discharge. Waste solids will be disposed of in a carefully designed and well-monitored landfill operation. Also, special design features have been included to minimize air emissions.

  6. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 2, Sections 1-16

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  7. Recovery Efficiency Test Project: Phase 1, Activity report. Volume 1: Site selection, drill plan preparation, drilling, logging, and coring operations

    SciTech Connect (OSTI)

    Overbey, W.K. Jr.; Carden, R.S.; Kirr, J.N.

    1987-04-01

    The recovery Efficiency Test well project addressed a number of technical issues. The primary objective was to determine the increased efficiency gas recovery of a long horizontal wellbore over that of a vertical wellbore and, more specifically, what improvements can be expected from inducing multiple hydraulic fractures from such a wellbore. BDM corporation located, planned, and drilled a long radius turn horizontal well in the Devonian shale Lower Huron section in Wayne County, West Virginia, demonstrating that state-of-the-art technology is capable of drilling such wells. BDM successfully tested drilling, coring, and logging in a horizontal well using air as the circulating medium; conducted reservoir modeling studies to protect flow rates and reserves in advance of drilling operations; observed two phase flow conditions in the wellbore not observed previously; cored a fracture zone which produced gas; observed that fractures in the core and the wellbore were not systematically spaced (varied from 5 to 68 feet in different parts of the wellbore); observed that highest gas show rates reported by the mud logger corresponded to zone with lowest fracture spacing (five feet) or high fracture frequency. Four and one-half inch casting was successfully installed in the borehole and was equipped to isolate the horizontal section into eight (8) zones for future testing and stimulation operations. 6 refs., 48 figs., 10 tabs.

  8. River Protection Project Integrated safety management system phase II verification report, volumes I and II - 8/19/99

    SciTech Connect (OSTI)

    SHOOP, D.S.

    1999-09-10

    The Department of Energy policy (DOE P 450.4) is that safety is integrated into all aspects of the management and operations of its facilities. In simple and straightforward terms, the Department will ''Do work safely.'' The purpose of this River Protection Project (RPP) Integrated Safety Management System (ISMS) Phase II Verification was to determine whether ISMS programs and processes are implemented within RFP to accomplish the goal of ''Do work safely.'' The goal of an implemented ISMS is to have a single integrated system that includes Environment, Safety, and Health (ES&H) requirements in the work planning and execution processes to ensure the protection of the worker, public, environment, and federal property over the RPP life cycle. The ISMS is comprised of the (1) described functions, components, processes, and interfaces (system map or blueprint) and (2) personnel who are executing those assigned roles and responsibilities to manage and control the ISMS. Therefore, this review evaluated both the ''paper'' and ''people'' aspects of the ISMS to ensure that the system is implemented within RPP. Richland Operations Office (RL) conducted an ISMS Phase I Verification of the TWRS from September 28-October 9, 1998. The resulting verification report recommended that TWRS-RL and the contractor proceed with Phase II of ISMS verification given that the concerns identified from the Phase I verification review are incorporated into the Phase II implementation plan.

  9. Tri-State Synfuels Project Review: Volume 9A. Subcontract information. [Proposed Henderson, Kentucky coal to gasoline plant; water supply and civil engineering subcontracts

    SciTech Connect (OSTI)

    Not Available

    1982-06-01

    Volume 9A considers subcontract work done at the site involving hydrogeological studies with respect to water supply and geotechnical work with respect to the building foundations necessary based on boreholes drilled and the lithology of the area. (LTN)

  10. Ground-water monitoring compliance projects for Hanford site facilities: Progress report for January 1 to March 31, 1988: Volume 9: Appendix C

    SciTech Connect (OSTI)

    Not Available

    1988-05-01

    The appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the first quarter of calendar year 1988 (January through March). The data in this volume of Appendix C cover the following wells: 199-N-58; 199-N-59; 199-N-60; 199-N-61; 199-N-67. The data are presented in the following order: Well Completion Report/Title III Inspection List, As-Built Diagram, Logging Charts, and Drill Logs.

  11. Final EIS Volume 3

    Office of Environmental Management (EM)

    Volume 3 Final Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center DOE/EIS-0226 January 2010 The West Valley Site Comment Response Document Final Environmental Impact Statement for AVAILABILITY OF THE FINAL EIS FOR DECOMMISSIONING AND/OR LONG- TERM STEWARDSHIP AT THE WEST VALLEY DEMONSTRATION PROJECT AND WESTERN NEW YORK NUCLEAR SERVICE CENTER For further information on this Final

  12. Final report on the Background Soil Characterization Project at the Oak Ridge Reservation, Oak Ridge, Tennessee. Volume 1: Results of Field Sampling Program

    SciTech Connect (OSTI)

    Watkins, D.R.; Ammons, J.T.; Branson, J.L.

    1993-10-01

    This report presents, evaluates, and documents data and results obtained in the Background Soil Characterization Project (BSCP). It is intended to be a stand-alone document for application and use in structuring and conducting remedial investigation and remedial action projects in the Environmental Restoration (ER) Program. The objectives of the BSCP consist of the following: determine background concentrations of organics, metals, and radionuclides in natural soils that are key to environmental restoration projects; provide remediation projects with 100% validated data on background concentrations, which are technically and legally defensible; and quantify baseline risks from background constituents for comparison of risks associated with contaminated sites.

  13. Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period January 1 to March 31, 1988: Volume 5, Appendix B

    SciTech Connect (OSTI)

    1988-05-01

    This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix B cover the following wells: 299-W6-2; 299-W7-1; 299-W7-2; 299-W7-3; 299-W7-4. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

  14. Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period January 1 to March 31, 1988: Volume 7, Appendix B (contd)

    SciTech Connect (OSTI)

    Not Available

    1988-05-01

    This appendix is one of nine volumes, and presents data describing wwlls completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix B cover the following wells: 299-W10-14; 299-W15-15; 299-W15-16; 299-W15-17; 299-W15-18. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

  15. Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period, January 1-March 31, 1988: Volume 6, Appendix B (contd)

    SciTech Connect (OSTI)

    Not Available

    1988-05-01

    This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix B cover the following wells: 299-W7-5; 299-W7-6; 299-W8-1; 299-W9-1; 299-W10-13. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

  16. Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period January 1 to March 31, 1988: Volume 8, Appendix B (contd)

    SciTech Connect (OSTI)

    Not Available

    1988-05-01

    This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix B cover the following wells: 299-W18-21; 299-W18-22; 299-W18-23; 299-W18-24. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

  17. Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period January 1 to March 31, 1988: Volume 2, Appendix A

    SciTech Connect (OSTI)

    Not Available

    1988-05-01

    This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix A cover the following wells: 299-E27-8; 299-E27-9; 299-E27-10; 299-E28-26; 299-E28-27. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

  18. Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period January 1 to March 31, 1988: Volume 4, Appendix A (contd)

    SciTech Connect (OSTI)

    Not Available

    1988-05-01

    This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix A cover the following wells: 299-E33-30; 299-E34-2; 299-E34-3; 299-E34-4; 299-E34-5; 299-E34-6. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

  19. Computational mechanics research and support for aerodynamics and hydraulics at TFHRC. Quarterly report January through March 2011. Year 1 Quarter 2 progress report.

    SciTech Connect (OSTI)

    Lottes, S. A.; Kulak, R. F.; Bojanowski, C.

    2011-05-19

    This project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at the Turner-Fairbank Highway Research Center for a period of five years, beginning in October 2010. The analysis methods employ well-benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water loads on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to assess them for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, vehicle stability under high wind loading, and the use of electromagnetic shock absorbers to improve vehicle stability under high wind conditions. This quarterly report documents technical progress on the project tasks for the period of January through March 2011.

  20. Probability of pipe fracture in the primary coolant loop of a PWR plant. Volume 4. Seismic response analysis. Load Combination Program Project I final report

    SciTech Connect (OSTI)

    Lu, S.C.; Ma, S.M.; Larder, R.A.

    1981-06-01

    This volume of the report gives a detailed account of the seismic response analysis of the primary coolant loop piping of Unit 1 of the Zion Nuclear Power Station. Because the purpose of this work was to perform a realistic simulation, best estimate loads and material properties were used for the calculation whenever possible. When such data were unavailable, conservative values were used. The calculation procedure included the generation of seismic input, the determination of dynamic soil properties, a three-part soil-structure-piping interaction analysis, and the post-response data procession. A large number of variables considered in the analysis can affect the seismic response stresses. This volume therefore describes a sensitivity study, as well as the method of analysis. The sensitivity study is included to establish confidence in the computed response stresses. 19 refs., 28 figs., 6 tabs.

  1. Independent Verification and Validation Of SAPHIRE 8 Volume 3 Users' Guide Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE 8 Volume 3 Users Guide is to assess the user documentation for its completeness, correctness, and consistency with respect to requirements for user interface and for any functionality that can be invoked by the user. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  2. Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects Projects

  3. QUARTER SHORT-TERM ENERGY OUTLOOK QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION

    Gasoline and Diesel Fuel Update (EIA)

    1Q) 1991 1 QUARTER SHORT-TERM ENERGY OUTLOOK QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION February 1991 This publication may be purchased from the Superintendent of Documents, U.S. Government Printing Office. Purchasing in formation for this or other Energy Information Administration (EIA) publications may be obtained from the Government Printing Office or ElA's National Energy Information Center. Questions on energy statistics should be directed to the Center by mail, telephone, or

  4. Desk study of the proposed Petroleum Resource Management and Assessment project for the Western Siberia Administration, Russia. Volume 1. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1992-05-15

    The United States Trade and Development Program (TDP) is considering the provision of funds to allow a U.S. firm or firms to be hired to conduct a feasibility study on a Petroleum Resource Management and Assessment project in Russia's West Siberian Basin. To evaluate whether or not to fund the study, TDP contracted a Desk Study to evaluate the concept of the project; cost out the scope of work for the feasibility study; estimate the potential exports of U.S. equipment and services during project implementation; and make a recommendation as to whether TDP should fund the study. The goal of the feasibility study would be to stem the rapid decline in oil and gas production which has resulted in a well-publicized hard currency crisis.

  5. Probability of pipe fracture in the primary coolant loop of a PWR Plant. Volume 7. System failure probability analysis. Load Combination Program Project I final report

    SciTech Connect (OSTI)

    George, L.; Mensing, R.

    1981-06-01

    This volume describes the computational methodology used to estimate the probability of a simultaneous occurrence of an earthquake and a primary coolant loop pipe fracture caused directly by an earthquake for a pressurized water reactor. Point estimates of this probability, based on a simulation experiment, and the probabilities of related events are included. Simulation is used to estimate weld fracture probabilities conditional on a crack initially existing and an earthquake of specified intensity occurring at a specified time in the life of the plant. These estimates are combined with probabilities associated with the occurrence of an earthquake and the existence of a crack to obtain an estimate of the probability of simultaneous earthquake and pipe fracture for the entire primary coolant loop piping system. A point estimate of probability, as outlined in this volume, does not fully take into consideration all of the uncertainties associated with an analysis of this type. Uncertainty analysis, confidence interval estimates, and sensitivity measures better reflect potential uncertainties. These topics are discussed. Finally, a discussion of the use of a risk-based, rather than a probability-based, decision criterion for deciding whether to decouple is included. 13 refs., 7 figs., 6 tabs.

  6. Final EIS Volume 2

    Office of Environmental Management (EM)

    Volume 2 Final Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center DOE/EIS-0226 January 2010 The West Valley Site (Appendices A through R) AVAILABILITY OF THE FINAL EIS FOR DECOMMISSIONING AND/OR LONG- TERM STEWARDSHIP AT THE WEST VALLEY DEMONSTRATION PROJECT AND WESTERN NEW YORK NUCLEAR SERVICE CENTER For further information on this Final EIS, or to request a copy of the EIS or

  7. Viability Assessment Volume 5

    SciTech Connect (OSTI)

    DOE,

    1998-12-01

    This volume presents a management summary of the cost estimate to complete the design, and to license, construct, operate, monitor, close, and decommission a Monitored Geologic Repository at Yucca Mountain in Nevada. This volume summarizes the scope, estimating methodologies, and assumptions used in development of the Monitored Geologic Repository-VA cost estimate. It identifies the key features necessary to understand the summary costs presented herein. This cost summary derives from a larger body of documented cost analysis. Volume 5 is organized to reflect this structured approach to cost estimation and contains the following sections: Section 1, Cost Elements. This section briefly defines the components of each major repository cost element. Section 2, Project Phases. This section presents the definition, as used in the estimate, of five project phases (Licensing, Pre-emplacement Construction, Emplacement Operations, Monitoring, and Closure and Decommissioning) and the schedule dates for each phase. It also contains major milestone dates and a bar chart schedule. Section 3, Major Assumptions. This section identifies key high-level assumptions for the cost estimate basis. Additional detailed assumptions are included in the appendices. Section 4, Integrated Cost Summary. This section presents a high-level roll-up of the VA costs resulting from the estimating work. The tables and figures contained in this section were compiled from the more detailed cost estimates in the appendices. Section 5, References. This section identifies the references that support this cost volume. Appendices. For each major repository cost element, Appendices B-F [B, C, D, E, F] presents additional information on the scope of cost elements, identifies methodologies used to develop the cost estimates, lists underlying cost assumptions, and tabulates summary results. Appendix A contains a glossary to assist the reader in understanding the terminology in Volume 5. Appendix G presents costs associated with three VA design options, as described in Volume 2. These costs are provided for information and are not compiled into the integrated cost summary.

  8. Fischer-Tropsch synthesis from a low HH/sub 2/:CO gas in a dry fluidized-bed system. Volume 1. Project summary. Final technical report, October 1, 1986. [Heat tray

    SciTech Connect (OSTI)

    Liu, Y.A.; Squires, A.M.

    1986-10-01

    The objective of this project is to experimentally develop and demonstrate a dry fluidized-bed reactor system (called ''heat tray'') for Fischer-Tropsch synthesis from a low H/sub 2/:CO gas. The reactor involves conducting catalytic synthesis reactions primarily in a horizontal conveying zone, in which fine particles of an iron catalyst are carried in a relatively dilute suspension by a large flow of reacting gas. A secondary reaction zone, in the form of a shallow fluidized bed of catalyst particles, is situated beneath the primary reaction zone. This shallow bed also has immersed horizontal heat-transfer tubes for removing reaction heat. A major thrust of the new reactor development is to prevent carbon deposits from forming on the iron catalyst, which cause deactivation and physical degradation. This is to be achieved by conducting the Fischer-Tropsch synthesis in an unsteady-state mode, particularly by alternately exposing the iron catalyst to a large flow of low H/sub 2/:CO gas for a short period of time and to a small flow of H/sub 2/-rich gas for a long period of time. The project has been carried out in two key tasks: (1) development of a microreactor system for unsteady-state Fischer-Tropsch synthesis, simulating the life history of an iron catalyst particle in a ''heat-tray'' reactor; and (2) supporting fluidization studies. The present Volume I summarizes the key conclusions and recommendations from this project, and the accompanying Volumes II and III describes the details of experimental investigations and results. 12 refs., 8 figs., 2 tabs.

  9. Volume I

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE/NV/l 0630-I 1 Volume I November 1990 . . . . . . ..A~- ["'asf NEVADA TEST SITE ANNUAL SITE ENVIRONMENTAL REPORT - 1989 Volume I Editors: Donald T. Wruble and Elizabeth M. McDowell Work Performed Under Contract No. DE-AC08-89NV10630 prepared by: Reynolds Electrical & Engineering Co., Inc. Post Office Box 98521 Las Vegas, Nevada 89193-8521 and United States Environmental Protection Agency Environmental Monitoring Systems Laboratory Post Office Box 93478 Las Vegas, Nevada 89193-3478

  10. Probability of pipe fracture in the primary coolant loop of a PWR Plant. Volume 3. Nonseismic stress analysis. Load Combination Program, Project I final report

    SciTech Connect (OSTI)

    Chan, A.L.; Lu, S.C.; Rybicki, E.F.; Curtis, D.J.

    1981-06-01

    This volume describes the analyses used to evaluate stresses due to loads other than seismic excitations in the primary coolant loop piping of a selected four-loop pressurized water reactor nuclear power station. The results of the analyses are used as input to a simulation procedure for predicting the probability of pipe fracture in the primary coolant system. Sources of stresses considered in the analyses are pressure, dead weight, thermal expansion, thermal gradients through the pipe wall, residual welding, and mechanical vibrations. Stresses due to dead weight and thermal expansion are computed from a three-dimensional finite element model that uses a combination of pipe, truss, and beam elements to represent the reactor coolant loop piping, reactor pressure vessel, reactor coolant pumps, steam generators, and the pressurizer. Stresses due to pressure and thermal gradients are obtained by closed-form solutions. Calculations of residual stresses account for the actual heat impact, welding speed, weld preparation geometry, and pre- and post-heat treatments. Vibrational stresses due to pump operation are estimated by a dynamic analysis using existing measurements of pump vibrations. 13 refs., 16 figs., 11 tabs.

  11. Definitive design report: Design report project W-025, Radioactive Mixed Waste (RMW) Land Disposal Facility NON-DRAG-OFF. Revision 1, Volume 1 and 2

    SciTech Connect (OSTI)

    Roscha, V.

    1994-11-29

    The purpose of this report is to describe the definitive design of the Radioactive Mixed Waste (RMW) Non-Drag-Off disposal facility, Project W-025. This report presents a n of the major landfill design features and a discussion of how each of the criteria is addressed in the design. The appendices include laboratory test results, design drawings, and individual analyses that were conducted in support of the design. Revision 1 of this document incorporates design changes resulting from an increase in the required operating life of the W-025 landfill from 2 to 20 years. The rationale for these design changes is described in Golder Associates Inc. 1991a. These changes include (1) adding a 1.5-foot-thick layer of compacted admix directory-under the primary FML on the floor of the landfill to mitigate the effects of possible stress cracking in the primary flexible membrane liner (FML), and (2) increasing the operations layer thickness from two to three feet over the entire landfill area, to provide additional protection for the secondary admix layer against mechanical damage and the effects of freezing and desiccation. The design of the W-025 Landfill has also been modified in response to the results of the EPA Method 9090 chemical compatibility testing program (Golder Associates Inc. 1991b and 1991c), which was completed after the original design was prepared. This program consisted of testing geosynthetic materials and soil/bentonite admix with synthetic leachate having the composition expected during the life of the W-025 Landfill., The results of this program indicated that the polyester geotextile originally specified for the landfill might be susceptible to deterioration. On this basis, polypropylene geotextiles were substituted as a more chemically-resistant alternative. In addition, the percentage of bentonite in the admix was increased to provide sufficiently low permeability to the expected leachate.

  12. Film Collection Volume One

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  13. Volume One Disc Two

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  14. Solar Fundamentals Volume 1: Technology

    Broader source: Energy.gov [DOE]

    This report is one component of a multi-part series publication to assist in educating th'se seeking to become more familiar with the solar industry. This volume introduces solar technologies, explaining each technology’s applications, the components that make up a photovoltaic system, and how they can be used to optimize energy generation. This report explains solar insolation and how it impacts energy generation in illustrating where solar energy is a viable option. A final section highlights important considerations in solar project siting to maximize system production and avoid unexpected project development challenges.

  15. FY 2007 Volume 5

    Energy Savers [EERE]

    5 DOE/CF-006 Volume 5 Environmental management Department of Energy FY 2007 Congressional Budget Request February 2006 Office of Chief Financial Officer Volume 5 DOE/CF-006 Volume 5 Printed with soy ink on recycled paper Environmental management Department of Energy/ Environmental Management FY 2007 Congressional Budget Volume 5 Table of Contents Page Appropriation Account Summary .........................................................................................................3

  16. FY 2008 Volume 5

    Energy Savers [EERE]

    5 DOE/CF-018 Volume 5 Environmental Management Department of Energy FY 2008 Congressional Budget Request February 2007 Office of Chief Financial Officer Volume 5 DOE/CF-018 Volume 5 Environmental Management Printed with soy ink on recycled paper Department of Energy/ Environmental Management FY 2008 Congressional Budget Volume 5 Table of Contents Page Appropriation Account Summary.............................................................................................................3

  17. FY 2010 Volume 4

    Energy Savers [EERE]

    4 DOE/CF-038 Volume 4 Science May 2009 Office of Chief Financial Officer FY 2010 Congressional Budget Request Volume 4 DOE/CF-038 Volume 4 Science Printed with soy ink on recycled paper Department of Energy/ Science FY 2010 Congressional Budget Volume 4 Table of Contents Page Appropriation Account Summary.............................................................................................................3 Appropriation Language

  18. FY 2012 Volume 4

    Energy Savers [EERE]

    0 Volume 4 Department of Energy FY 2012 Congressional Budget Request Science Science February 2011 Office of Chief Financial Officer Volume 4 DOE/CF-0060 Volume 4 Department of Energy FY 2012 Congressional Budget Request Science Science February 2011 Office of Chief Financial Officer Volume 4 Printed with soy ink on recycled paper Department of Energy/ Science FY 2012 Congressional Budget Volume 4 Table of Contents Page Appropriation Account Summary

  19. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 3 of 3

    SciTech Connect (OSTI)

    Beck Colleen M.,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  20. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 2 of 3

    SciTech Connect (OSTI)

    Beck Colleen M.,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  1. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 1 of 3

    SciTech Connect (OSTI)

    Beck Colleen M,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  2. Northern Pass Transmission Line Project Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September ...

  3. FY 2007 Volume 1

    Energy Savers [EERE]

    Chief Financial Officer Volume 1 DOE/CF-002 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Printed with soy ink on recycled paper Department of Energy FY 2007 Congressional Budget Request February 2006 Office of Chief Financial Officer Volume 1 DOE/CF-002 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors

  4. FY 2012 Volume 7

    Energy Savers [EERE]

    3 Volume 7 Department of Energy FY 2012 Congressional Budget Request Nuclear Energy D f N l W t Di l Defense Nuclear Waste Disposal Nuclear Waste Disposal February 2011 Office of Chief Financial Officer Volume 7 Printed with soy ink on recycled paper Department of Energy/ Volume 7 FY 2012 Congressional Budget Volume 7 Table of Contents Page Appropriation Account Summary ........................................................................................................... 3 Nuclear Energy

  5. FY 2013 Volume 5

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 DOE/CF-0075 Volume 5 Environmental Management Department of Energy FY 2013 Congressional Budget Request February 2012 Office of Chief Financial Officer Volume 5 DOE/CF-0075 Volume 5 Environmental Management Printed with soy ink on recycled paper Department of Energy FY 2013 Congressional Budget Request Environmental Management Page 1 FY 2013 Congressional Budget Volume 5 Table of Contents Page Appropriation Account Summary

  6. FY 2008 Volume 6

    Energy Savers [EERE]

    6 DOE/CF-019 Volume 6 Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Power Administration Bonneville Power Administration Department of Energy FY 2008 Congressional Budget Request February 2007 Office of Chief Financial Officer Volume 6 DOE/CF-019 Volume 6 Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Power Administration Bonneville Power Administration Printed with soy ink

  7. FY 2009 Volume 6

    Energy Savers [EERE]

    6 DOE/CF-029 Volume 6 Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Bonneville Power Administration February 2008 Office of Chief Financial Officer Department of Energy FY 2009 Congressional Budget Request Volume 6 DOE/CF-029 Volume 6 Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Bonneville Power Administration Printed

  8. FY 2012 Volume 1

    Energy Savers [EERE]

    7 Volume 1 Department of Energy FY 2012 Congressional Budget Request National Nuclear Security Administration Office of the Administrator Weapons Activities Weapons Activities Defense Nuclear Nonproliferation Naval Reactors February 2011 Office of Chief Financial Officer Volume 1 Printed with soy ink on recycled paper Department of Energy/ National Nuclear Security Administration FY 2012 Congressional Budget Volume 1 Table of Contents Page Appropriation Account Summary

  9. FY 2012 Volume 5

    Energy Savers [EERE]

    1 Volume 5 Department of Energy FY 2012 Congressional Budget Request Environmental Management February 2011 Office of Chief Financial Officer Volume 5 Printed with soy ink on recycled paper Environmental Management FY 2011 Congressional Budget Volume 5 Table of Contents Page Appropriation Account Summary .............................................................................................................3 Appropriation Language

  10. FY 2013 Volume 6

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Volume 6 Department of Energy FY 2013 Congressional Budget Request Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Western Area Power Administration Bonneville Power Administration February 2012 Office of Chief Financial Officer Volume 6 DOE/CF-0076 Volume 6 Department of Energy FY 2013 Congressional Budget Request Power Marketing Administrations Southeastern Power Administration Southwestern Power

  11. The Manhattan Project National Security History Series

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Manhattan Project National Security History Series 5 Visit our Manhattan Project web site: http://www.cfo.doe.gov/me70/manhattan/index.htm 5 DOE/MA-0002 Revised F. G. Gosling Offce of History and Heritage Resources Executive Secretariat Offce of Management Department of Energy January 2010 The Manhattan Project National Security History Series 5 National Security History Series Volume I: The Manhattan Project: Making the Atomic Bomb Volume II: Building the Nuclear Arsenal: Cold War Nuclear

  12. Savannah River Site Approved Site Treatment Plan, 2001 Annual Update (Volumes I and II)

    SciTech Connect (OSTI)

    Lawrence, B.

    2001-04-30

    The Compliance Plan Volume (Volume I) identifies project activity scheduled milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

  13. FY 2010 Volume 5

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Project has unique political, technical, cost, and ... and Liability Act, Tri-Party Agreement, Clean Air Act, ... The Interim Pretreatment System Project definition work ...

  14. FY 2006 Volume 1

    Energy Savers [EERE]

    National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Office of Management, Budget and Evaluation/CFO Volume 1 February 2005 DOE/ME-0046 Volume 1 Department of Energy FY 2006 Congressional Budget Request National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Office of Management, Budget and Evaluation/CFO Volume 1 February 2005

  15. FY 2006 Volume 2

    Energy Savers [EERE]

    2 February 2005 DOE/ME-0047 Volume 2 Other Defense Activities Security & Performance Assurance Environment, Safety & Health Legacy Management Nuclear Energy Defense Related Administrative Support Office of Hearings & Appeals Safeguards & Security Crosscut Department of Energy FY 2006 Congressional Budget Request Office of Management, Budget and Evaluation/CFO Volume 2 February 2005 DOE/ME-0047 Volume 2 Other Defense Activities Security & Performance Assurance Environment,

  16. FY 2006 Volume 5

    Energy Savers [EERE]

    5 February 2005 DOE/ME-0050 Volume 5 Environmental Management Defense Site Acceleration Completion Defense Environmental Services Non-Defense Site Acceleration Completion Non-Defense Environmental Services Uranium Enrichment Decontamination and Decommissioning Fund Department of Energy FY 2006 Congressional Budget Request Office of Management, Budget and Evaluation/CFO Volume 5 February 2005 DOE/ME-0050 Volume 5 Environmental Management Defense Site Acceleration Completion Defense Environmental

  17. FY 2006 Volume 6

    Energy Savers [EERE]

    6 February 2005 DOE/ME-0051 Volume 6 Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Bonneville Power Administration Department of Energy FY 2006 Congressional Budget Request Office of Management, Budget and Evaluation/CFO Volume 6 February 2005 DOE/ME-0051 Volume 6 Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Bonneville

  18. FY 2006 Volume 7

    Energy Savers [EERE]

    7 February 2005 DOE/ME-0052 Volume 7 Interior & Related Agencies Fossil Energy Research & Development Naval Petroleum & Oil Shale Reserves Elk Hills School Lands Fund Energy Conservation Economic Regulation Strategic Petroleum Reserve Energy Information Administration Clean Coal Technology Department of Energy FY 2006 Congressional Budget Request Office of Management, Budget and Evaluation/CFO Volume 7 February 2005 DOE/ME-0052 Volume 7 Interior & Related Agencies Fossil Energy

  19. FY 2007 Volume 2

    Energy Savers [EERE]

    2 DOE/CF-003 Volume 2 Other defense activities Security & Safety Performance assurance Environment, safety & health Legacy management Nuclear energy Defense related administrative support Hearings and appeals Safeguards & security crosscut Department of Energy FY 2007 Congressional Budget Request February 2006 Office of Chief Financial Officer Volume 2 DOE/CF-003 Volume 2 Printed with soy ink on recycled paper Other defense activities Security & Safety Performance assurance

  20. FY 2007 Volume 3

    Energy Savers [EERE]

    3 DOE/CF-004 Volume 3 Energy supply and Conservation Energy efficiency and renewable energy Electricity delivery and energy reliability Nuclear energy Environment, safety and health Legacy management Department of Energy FY 2007 Congressional Budget Request February 2006 Office of Chief Financial Officer Volume 3 DOE/CF-004 Volume 3 Printed with soy ink on recycled paper Energy supply and Conservation Energy efficiency and renewable energy Electricity delivery and energy reliability Nuclear

  1. FY 2007 Volume 6

    Energy Savers [EERE]

    6 DOE/CF-007 Volume 6 Power marketing administrations Southeastern power administration Southwestern power administration Western power administration Bonneville power administration Department of Energy FY 2007 Congressional Budget Request February 2006 Office of Chief Financial Officer Volume 6 DOE/CF-007 Volume 6 Printed with soy ink on recycled paper Power marketing administrations Southeastern power administration Southwestern power administration Western power administration Bonneville

  2. FY 2007 Volume 7

    Energy Savers [EERE]

    7 DOE/CF-008 Volume 7 Fossil energy and other Fossil energy research and development Naval petroleum & oil shale reserves Elk hills school lands fund Strategic petroleum reserve Clean coal technology Energy information administration Department of Energy FY 2007 Congressional Budget Request February 2006 Office of Chief Financial Officer Volume 7 DOE/CF-008 Volume 7 Printed with soy ink on recycled paper Fossil energy and other Fossil energy research and development Naval petroleum & oil

  3. FY 2008 Volume 1

    Energy Savers [EERE]

    1 DOE/CF-014 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Department of Energy FY 2008 Congressional Budget Request February 2007 Office of Chief Financial Officer Volume 1 DOE/CF-014 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Printed with soy ink on recycled paper Office of the Administrator

  4. FY 2008 Volume 2

    Energy Savers [EERE]

    2 DOE/CF-015 Volume 2 Other Defense Activities Health, Safety and Security Legacy Management Nuclear Energy Defense-Related Administrative Support Hearings and Appeals Safeguards and Security Crosscut Department of Energy FY 2008 Congressional Budget Request February 2007 Office of Chief Financial Officer Volume 2 DOE/CF-015 Volume 2 Other Defense Activities Health, Safety and Security Legacy Management Nuclear Energy Defense-Related Administrative Support Hearings and Appeals Safeguards and

  5. FY 2008 Volume 3

    Energy Savers [EERE]

    3 DOE/CF-016 Volume 3 Energy Supply and Conservation Energy Efficiency and Renewable Energy Electricity Delivery and Energy Reliability Nuclear Energy Legacy Management Department of Energy FY 2008 Congressional Budget Request February 2007 Office of Chief Financial Officer Volume 3 DOE/CF-016 Volume 3 Energy Supply and Conservation Energy Efficiency and Renewable Energy Electricity Delivery and Energy Reliability Nuclear Energy Legacy Management Printed with soy ink on recycled paper Energy

  6. FY 2008 Volume 7

    Energy Savers [EERE]

    7 DOE/CF-020 Volume 7 Fossil Energy and Other Fossil Energy Research and Development Naval Petroleum & Oil Shale Reserves Elk Hills School Lands Fund Strategic Petroleum Reserve Clean Coal Technology Ultra-Deepwater Unconventional Natural Gas Energy Information Administration Department of Energy FY 2008 Congressional Budget Request February 2007 Office of Chief Financial Officer Volume 7 DOE/CF-020 Volume 7 Fossil Energy and Other Fossil Energy Research and Development Naval Petroleum &

  7. FY 2009 Volume 1

    Energy Savers [EERE]

    1 DOE/CF-024 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors February 2008 Office of Chief Financial Officer Department of Energy FY 2009 Congressional Budget Request Volume 1 DOE/CF-024 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Printed with soy ink on recycled paper Office of the Administrator

  8. FY 2009 Volume 7

    Energy Savers [EERE]

    7 DOE/CF-030 Volume 7 Fossil Energy Research and Development Naval Petroleum and Oil Shale Reserves Strategic Petroleum Reserve Northeast Home Heating Oil Reserve Clean Coal Technology Ultra-Deepwater Unconventional Natural Gas February 2008 Office of Chief Financial Officer Department of Energy FY 2009 Congressional Budget Request Volume 7 DOE/CF-030 Volume 7 Fossil Energy Research and Development Naval Petroleum and Oil Shale Reserves Strategic Petroleum Reserve Northeast Home Heating Oil

  9. FY 2010 Volume 1

    Energy Savers [EERE]

    1 DOE/CF-035 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors May 2009 Office of Chief Financial Officer FY 2010 Congressional Budget Request Volume 1 DOE/CF-035 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Printed with soy ink on recycled paper Office of the Administrator Weapons Activities Defense

  10. FY 2010 Volume 6

    Energy Savers [EERE]

    6 DOE/CF-040 Volume 6 Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Bonneville Power Administration May 2009 Office of Chief Financial Officer FY 2010 Congressional Budget Request Volume 6 DOE/CF-040 Volume 6 Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Bonneville Power Administration Printed with soy ink on recycled

  11. FY 2005 Volume 1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Volume 1 February 2004 Volume 1 National Nuclear Security Administration National Nuclear Security Administration Office of the Administrator Office of the Administrator Weapons Activities Weapons Activities Defense Nuclear Nonproliferation Defense Nuclear Nonproliferation Naval Reactors Naval Reactors Office of Management, Budget and Evaluation/CFO Department of Energy Department of Energy FY 2005 Congressional Budget FY 2005 Congressional Budget Request Request DOE/ME-0032 Volume 1 February

  12. FY 2005 Volume 4

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ME-0035 Volume 4 Science Science Nuclear Waste Disposal Nuclear Waste Disposal Defense Nuclear Waste Disposal Defense Nuclear Waste Disposal Departmental Administration Departmental Administration Inspector General Inspector General Working Capital Fund Working Capital Fund February 2004 Volume 4 Office of Management, Budget and Evaluation/CFO Department of Energy Department of Energy FY 2005 Congressional Budget FY 2005 Congressional Budget Request Request DOE/ME-0035 Volume 4 Science Science

  13. FY 2013 Volume 2

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Volume 2 f Department of Energy FY 2013 Congressional B d R Budget Request Other Defense Activities Departmental Administration Inspector General Working Capital F nd Working Capital Fund Safeguards and Security Crosscut Pensions February 2012 Office of Chief Financial Officer Volume 2 DOE/CF-0072 Volume 2 f Department of Energy FY 2013 Congressional B d R Budget Request Other Defense Activities Departmental Administration Inspector General Working Capital F nd Working Capital Fund Safeguards

  14. FY 2013 Volume I

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 DOE/CF-0071 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Department of Energy FY 2013 Congressional Budget Request February 2012 Office of Chief Financial Officer Volume 1 DOE/CF-0071 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Printed with soy ink on recycled paper Department of Energy FY 2013

  15. About Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Projects MicroBooNE Project Web Pages The Project Pages hold information and links for the collaboration and its Project Managers, and also hold links to project Director's and...

  16. The Manhattan Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Manhattan Project The Manhattan Project A brief History of the Manhattan Project: Terrence R. Fehner and F.G. Gosling, The Manhattan Project, 2012, 10 p. PDF icon The Manhattan Project.pdf More Documents & Publications Fehner and Gosling, Origins of the Nevada Test Site Fehner and Gosling, Atmospheric Nuclear Weapons Testing, 1951-1963. Battlefield of the Cold War: The Nevada Test Site, Volume I Gosling, The Manhattan Project: Making the Atomic Bomb

  17. FY 2012 Volume 6

    Energy Savers [EERE]

    2 Volume 6 Department of Energy FY 2012 Congressional Budget Request Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Western Area Power Administration Bonneville Power Administration February 2011 Office of Chief Financial Officer Volume 6 Printed with soy ink on recycled paper Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Bonneville Power Administration

  18. FY 2005 Volume 2

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Volume 2 February 2004 Volume 2 Office of Management, Budget and Evaluation/CFO Other Defense Activities Other Defense Activities Energy Security and Assurance Energy Security and Assurance Security Security Independent Oversight & Performance Assurance Independent Oversight & Performance Assurance Civilian Radioactive Waste Management Civilian Radioactive Waste Management Environment, Safety & Health Environment, Safety & Health Legacy Management Legacy Management Nuclear

  19. FY 2005 Volume 3

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Volume 3 February 2004 Volume 3 Office of Management, Budget and Evaluation/CFO Energy Supply Energy Supply Energy Efficiency and Renewable Energy Energy Efficiency and Renewable Energy Electric Transmission and Distribution Electric Transmission and Distribution Nuclear Energy Nuclear Energy Civilian Radioactive Waste Management Civilian Radioactive Waste Management Environment, Safety & Health Environment, Safety & Health Future Liabilities Future Liabilities Legacy Management Legacy

  20. FY 2005 Volume 5

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Volume 5 Environmental Management Environmental Management Defense Site Acceleration Completion Defense Site Acceleration Completion Defense Environmental Services Defense Environmental Services Non Non - - Defense Site Acceleration Completion Defense Site Acceleration Completion Non Non - - Defense Environmental Services Defense Environmental Services Uranium Enrichment Decontamination Uranium Enrichment Decontamination and Decommissioning Fund and Decommissioning Fund February 2004 Volume 5

  1. FY 2005 Volume 6

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Volume 6 Power Marketing Administrations Power Marketing Administrations Southeastern Power Administration Southeastern Power Administration Southwestern Power Administration Southwestern Power Administration Western Area Power Administration Western Area Power Administration Bonneville Power Administration Bonneville Power Administration February 2004 Volume 6 Office of Management, Budget and Evaluation/CFO Department of Energy Department of Energy FY 2005 Congressional Budget FY 2005

  2. Building America Program Evaluation, Harvard University, Volume 1, 2004 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 1, 2004 Building America Program Evaluation, Harvard University, Volume 1, 2004 Building America Program Evaluation, Volume I: Main Report, prepared by Energy Technology Innovation Project (ETIP), Kennedy School of Government, Harvard University, Vicki Norberg-Bohm, Principal Investigator, Chad White, Lead Author, September 2004. PDF icon Building America Program Evaluation More Documents & Publications Building America Program Evaluation, Harvard University, Volume

  3. Probability of pipe fracture in the primary coolant loop of a PWR plant. Volume 8. Pipe fracture indirectly induced by an earthquake. Load Combination Program, Project I final report

    SciTech Connect (OSTI)

    Streit, R.D.

    1981-06-01

    This volume considers the probability that a double-ended guillotine break in the primary coolant loop of a pressurized water reactor occurs simultaneously with (and is indirectly caused by) a seismic event. The pipe break is a consequence of a seismically initiated failure in a system other than the primary piping itself. Events studied that can lead to an indirectly induced pipe break include structural and mechanical failures, missile impact, pressure transients, jet impingement, fire, and explosion. Structural failures of the supports for the reactor pressure vessel, reactor coolant pump, and steam generator have the highest probability of causing a double-ended pipe break. Furthermore, we found that structural failure of the containment dome and failure of the reactor coolant pump flywheel have the highest potential for a missile-caused pipe break. Since structural failure proved to be a major factor, we developed a model to estimate the probability of structural failure; this model is based on the engineering factors of safety and seismic hazard. preliminary results indicate that the probability of a double-ended pipe break indirectly caused by a seismic event during the plant life is on the order of 10/sup -9/.

  4. National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #10, January-March 2006

    SciTech Connect (OSTI)

    Not Available

    2006-04-01

    Volume 10 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

  5. National Bioenergy Center Sugar Platform Integration Project: Quarterly Update #12, July-September 2006

    SciTech Connect (OSTI)

    Schell, D.

    2006-10-01

    Volume 12 of a quarterly newsletter that describes the activities of the National Bioenergy Center's Sugar Platform Integration Project.

  6. Final Project Report on Arsenic Biogeochemistry in the Clinch River and Watts Bar Reservoir, Volume 2: Quality Assurance/Quality Control Summary Report for Arsenic Biogeochemistry in the Clinch River and Watts Bar Reservoir

    SciTech Connect (OSTI)

    Newman, K.A.

    1995-01-01

    Arsenic contamination was studied in the Clinch River/Watts Bar Reservoir (CR/WBR) system downstream from the U.S. Department of Energy's Oak Ridge Reservation (ORR). Arsenic is of particular interest and concern because (1) it occurs commonly in coal-bearing rock and waste products such as fly ash associated with the burning of coal, (2) it is classified as a Class A carcinogen by the U. S. Environmental Protection Agency, and (3) disposal of fly ash, both on and off the ORR, may have contaminated surface water and sediments in the Clinch River and Watts Bar Reservoir. The present study differs from previous reports on arsenic concentrations in the CR/WBR system in the use of much more sensitive and precise processing and analytical techniques to measure arsenic species (arsenate, arsenite, and organic arsenic) at levels well below the ecological and human health risk screening criteria. The absolute detection limits using these techniques are approximately 20 to 40 pmol/L, or 0.0015 to 0.003 {micro}g/L. Four main sites were sampled quarterly over a 3-year period (1990 through 1992). Sites investigated included Lower Watts Bar Reservoir near the Watts Bar Dam (Tennessee River kilometer 849.6), the Kingston area (Clinch River kilometer 1.6), Poplar Creek (Poplar Creek kilometer 1.6), and the McCoy Branch Embayment (McCoy Branch kilometer 0.3). Additional sites were investigated in the vicinity of these main stations to determine the distribution of contamination and to identify possible alternative or additional sources of arsenic. Detection limits that were a factor of 20 below the minimum risk screening criteria were achieved for 100% of arsenic speciation data. However, 118 samples for inductively coupled plasma metals analysis were not preserved to analytical specifications, and the analytical holding times for 180 ion chromatography samples were not met. More rigorous preservative testing protocols and more tightly defined analytical statements of work will prevent these problems in the future. Introduction, background, materials and methods, results, discussion, and conclusions are presented in Volume 1. The Quality Assurance/Quality Control Summary Report; the listing of water quality and surface water arsenic speciation data by source and site; and the listing of pore water arsenic speciation and particle-to-water distribution coefficients for As, Fe, and Mn by source, site, and season are presented in Volume 2. The Clinch River Environmental Restoration Program is currently completing the second phase of the Clinch River Remedial Investigation, with the intent of performing a baseline risk assessment on collected data. The data collected for this report will contribute to the baseline risk assessment for the Clinch River. Many of the goals of the Clinch River Remedial Investigation were refined using the results of this study.

  7. Executive Order 13212 - Actions To Expedite Energy-Related Projects...

    Office of Environmental Management (EM)

    Projects: Federal Register Notice Volume 66, No. 99 - May 18, 2001 The increased production and transmission of energy in a safe and environmentally sound manner is...

  8. Viability Assessment Volume 4

    SciTech Connect (OSTI)

    DOE

    1998-12-01

    Volume 4 provides the DOE plan and cost estimate for the remaining work necessary to proceed from completing this VA to submitting an LA to NRC. This work includes preparing an EIS and evaluating the suitability of the site. Both items are necessary components of the documentation required to support a decision in 2001 by the Secretary of Energy on whether or not to recommend that the President approve the site for development as a repository. If the President recommends the site to Congress and the site designation becomes effective, then DOE will submit the LA to NRC in 2002 for authorization to construct the repository. The work described in Volume 4 constitutes the last step in the characterization of the Yucca Mountain site and the design and evaluation of the performance of a repository system in the geologic setting of this site. The plans in this volume for the next 4 years' work are based on the results of the previous 15 years' work, as reported in Volumes 1, 2, and 3 of this VA. Volume 1 summarizes what DOE has learned to date about the Yucca Mountain site. Volume 2 describes the current, reference repository design, several design options that might enhance the performance of the reference design, and several alternative designs that represent substantial departures from the reference design. Volume 2 also summarizes the results of tests of candidate materials for waste packages and for support of the tunnels into which waste would be emplaced. Volume 3 provides the results of the latest performance assessments undertaken to evaluate the performance of the design in the geologic setting of Yucca Mountain. The results described in Volumes 1, 2, and 3 provide the basis for identifying and prioritizing the work described in this volume. DOE believes that the planned work, together with the results of previous work, will be sufficient to support a site suitability evaluation for site recommendation and, if the site is recommended and designated, a defensible LA. Volume 4 is divided into seven sections. Section 2 presents a rationale and summary for the technical work to be done to develop the preclosure and postclosure safety cases that will support the compliance evaluations required for the evaluation of site suitability and for licensing. Section 2 also describes other necessary technical work, including that needed to support design decisions and development of the necessary design information. Section 3 presents a more detailed description of the technical work required to address the issues identified in Section 2. Section 3 also describes activities that will continue after submittal of the site recommendation and the LA. Examples include the drift scale heater test in the Exploratory Studies Facility (Section 3.1.4.3) and long-term waste package corrosion testing (Section 3.2.2.9). Section 4 discusses the statutory and regulatory framework for site recommendation and submittal of an LA, and describes the activities and documentation that must be completed to achieve these milestones, including the development of an EIS. Section 5 describes the numerous activities required to support program milestones, including support for completing the testing program, continuing tests as part of the performance confirmation program, and managing information and records to support regulatory and legal review. Sections 6 and 7 provide cost and schedule information for the activities planned.

  9. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LaboratoryNational Security Education Center Menu NSEC Educational Programs Los Alamos Dynamics Summer School Science of Signatures Advanced Studies Institute Judicial Science School SHM Data Sets and Software Research Projects Current Projects Past Projects Publications NSEC » Engineering Institute » Research Projects » Joint Los Alamos National Laboratory/UCSD research projects Past Research Projects Previous collaborations between Los Alamos National Laboratory and the University of

  10. FY 2005 Volume 7

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 Volume 7 Interior & Related Agencies Interior & Related Agencies Fossil Energy Research & Development Fossil Energy Research & Development Naval Petroleum & Oil Shale Reserves Naval Petroleum & Oil Shale Reserves Elk Hills School Lands Fund Elk Hills School Lands Fund Energy Conservation Energy Conservation Economic Regulation Economic Regulation Strategic Petroleum Reserve Strategic Petroleum Reserve Energy Information Administration Energy Information Administration

  11. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current Research Projects Joint Los Alamos National LaboratoryUCSD Research Projects Collaborations between Los Alamos National Laboratory and the University of California at San...

  12. Project Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Management Project Management MaRIE is the experimental facility needed to control the time-dependent properties of materials for national security science missions. It...

  13. Project Accounts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Accounts Project Accounts A redirector page has been set up without anywhere to redirect to. Last edited: 2016-02-01 08:06:53

  14. Project Controls

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  15. Viability Assessment Volume 2

    SciTech Connect (OSTI)

    DOE

    1998-12-01

    This volume describes the major design features of the Monitored Geologic Repository. This document is not intended to provide an exhaustive, detailed description of the repository design. Rather, this document summarizes the major systems and primary elements of the design that are radiologically significant, and references the specific technical documents and design analyses wherein the details can be found. Not all portions of the design are at the same level of completeness. Highest priority has been given to assigning resources to advance the design of the Monitored Geologic Repository features that are important to radiological safety and/or waste isolation and for which there is no NRC licensing precedent. Those features that are important to radiological safety and/or waste isolation, but for which there is an NRC precedent, receive second priority. Systems and features that have no impact on radiological safety or waste isolation receive the lowest priority. This prioritization process, referred to as binning, is discussed in more detail in Section 2.3. Not every subject discussed in this volume is given equal treatment with regard to the level of detail provided. For example, less detail is provided for the surface facility design than for the subsurface and waste package designs. This different level of detail is intentional. Greater detail is provided for those functions, structures, systems, and components that play key roles with regard to protecting radiological health and safety and that are not common to existing nuclear facilities already licensed by NRC. A number of radiological subjects are not addressed in the VA, (e.g., environmental qualification of equipment). Environmental qualification of equipment and other radiological safety considerations will be addressed in the LA. Non-radiological safety considerations such as silica dust control and other occupational safety considerations are considered equally important but are not addressed in th is volume of the VA (see Volume 1, Section 2.2.1.2, subsection on Health Related Mineral Issues).

  16. FY 2013 Volume 3

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 DOE/CF-0073 Volume 3 Printed with soy ink on recycled paper Department of Energy FY 2013 Congressional Budget Request Energy Efficiency and Renewable Energy Electricity Delivery and Energy Reliability Nuclear Energy Fossil Energy Research and Development Naval Petroleum and Oil Shale Reserves Strategic Petroleum Reserve Northeast Home Heating Oil Reserve Ultra-Deepwater Unconventional Natural Gas Elk Hills Lands Fund Advanced Tech. Vehicle Manufacturing Loan Program Title 17 Innovative Tech.

  17. Project Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Information Slider award map The REE Program funds projects focused on developing economically feasible and environmentally benign technologies for recovering REEs from coal and/or coal by-products. Project Information The listed projects represent the current REE program portfolio. Agreement Number Project Title Performer Name FWP-ORD REE FY2016-2020 Rare Earth Elements (REE) from Coal and Coal By-Products National Energy Technology Laboratory

  18. Building America Program Evaluation, Harvard University, Volume 2, 2004 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 2, 2004 Building America Program Evaluation, Harvard University, Volume 2, 2004 Building America Program Evaluation, Volume II: Appendices, prepared by: Energy Technology Innovation Project (ETIP), Kennedy School of Government, Harvard University, Vicki Norberg-Bohm, Principal Investigator, Chad White, Lead Author, September 2004. PDF icon Building America Program Evaluation More Documents & Publications DOE-STD-1029-92 Building America Program Evaluation, Harvard

  19. Monthly Project Bulletin: January 2012 | Department of Energy

    Energy Savers [EERE]

    January 2012 Monthly Project Bulletin: January 2012 This document contains the Guidelines for Home Energy Professionals Project bulletin for the month of January 2012. PDF icon januarybulletin.pdf More Documents & Publications Monthly Project Bulletin: February 2012 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 9, 2012, Volume 3 No. 3 Monthly Project Bulletin: April

  20. 1988 DOE model conference proceedings: Volume 4

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    These Proceedings of the October 3-7, 1988, DOE Model Conference are a compilation of the papers that were presented in the technical or poster sessions at the conference. Papers and posters not submitted for publication are not included in the Proceedings. The Table of Contents lists the titles of papers as well as the names of the presenters. These individuals are not, in all cases, the primary authors of the papers published. The actual title pages, appearing later with the papers, show the primary author(s) and all co-authors. The papers in all three volumes of the Proceedings appear as they were originally submitted for publication and have not been edited or changed in any way. Topics discussed in Volume 4 include site characterization and remediation projects, environmental monitoring and modeling; disposal site selection and facility design, risk assessment, safety and health issues, and site remediation technology.

  1. Line Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grand Coulee Transmission Line Replacement Project Hooper Springs McNary-John Day Montana-to-Washington Transmission System Upgrade Project - M2W Olympia-Grand Coulee No. 1...

  2. Project Gnome

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Gnome Double Beta Decay Dark Matter Biology Repository Science Renewable Energy The first underground physics experiment near Carlsbad was Project Gnome, December 10, 1961 Totally unrelated (and many years prior) to WIPP, the Project Gnome detonation was the first U.S. underground nuclear test with the objective of using nuclear explosives for peaceful applications. Project Gnome was intended to provide a detailed understanding of the underground environment created when a nuclear

  3. Enloe Dam Passage Project, Volume I, 1984 Annual Report.

    SciTech Connect (OSTI)

    Fanning, M.L.

    1985-07-01

    This report discusses issues related to the provision of fish passage facilities at Enloe Dam and the introduction of anadromous salmonid fish to the upper Similkameen River basin. The species of fish being considered is a summer run of steelhead trout adapted to the upper Columbia basin. (ACR)

  4. Solar Technology Assessment Project. Volume VII. A review of OTEC

    SciTech Connect (OSTI)

    Yuen, P.C.

    1981-04-01

    The Ocean Thermal Energy Conversion (OTEC) principle is discussed along with general system and cycle types, specific OTEC designs, applications, and the ocean thermal resource. the historic development and present status of OTEC are reviewed. Power system components of the more technically advanced closed-cycle OTEC concept are discussed: heat exchangers, corrosion and biofouling countermeasures, working fluids, ammonia power systems, and on-platform seawater sytems. Several open-cycle features are also discussed. A critical review of the ocean engineering aspects of the OTEC power system is presented. Major subsystems such as platform, cold water pipe, mooring system, dynamic positioning system and power transmission cable system are assessed for their relationships with the ocean environment and with each other. Nine available studies of OTEC costs are reviewed, and tentative comparisons are made between OTEC and traditional fuel costs. OTEC products and markets are considered. Possible environmental and social effects of OTEC development are discussed. International and national laws regulating OTEC plants are reviewed, specifically, the United Nations Third Conference on the Law of the Sea and the Ocean Thermal Energy Conversion Act of 1980. Coast Guard regulations, OSHA laws, and state and local government regulations are also considered as well as attitudes of the utilities. (LEW)

  5. Proposed Southline Transmission Line Project - Volume 4 of 4...

    Office of Environmental Management (EM)

    These resources include recreation, rangelands, timber, minerals, watershed, fish and wildlife habitat, wilderness, air, and scenic quality, as well as scientific and...

  6. Proposed Southline Transmission Line Project - Volume 4 of 4...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bureau of Land Management 3 The Arizona State Historic Preservation Officer 4 The New Mexico State Historic Preservation Officer 5 The Advisory Council on Historic Preservation 6...

  7. Proposed Southline Transmission Line Project - Volume 2 of 4

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    would contribute to cumulative impacts on wildlife resources include the 27 Sapphire Energy Algae Facility, Lightning Dock Geothermal Power Plant, and Bowie Power Station. 28...

  8. Northern Pass Transmission Line Project Environmental Impact Statement:

    Energy Savers [EERE]

    Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 | Department of Energy Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 -

  9. Hexahedron Projection by Triangle Fans and Strips

    Energy Science and Technology Software Center (OSTI)

    2007-05-10

    The program divides the projection of a hexahedron with not-necessarily-planar quadrilateral faces, such as would arise in a curvilinear grid, by the projections of its edges, into polygons overlapped by a single front-facing and a single back-facing face. These polygons are further organized into triangle strips and fans, for rapid volume rendering in graphics hardware.

  10. Isotopic prediction of eruption volume at continental volcanoes

    SciTech Connect (OSTI)

    Perry, F.V.; Valentine, G.A.; Crowe, B.M.

    1997-10-01

    This is the final report of a one-year, Laboratory Directed Research and Development (LDRD) project at Los Alamos National Laboratory (LANL). The objective of this project was to determine whether isotopic techniques can be used to assess the eruption potential and eruption volume of continental stratovolcanoes. Large-volume eruptions from stratovolcanoes pose significant hazards to population and infrastructure in many parts of the world. We are testing whether this technique will allow a short- to medium-term (decades to millennia) probabilistic hazard assessment of large-volume eruptions. If successful, the technique will be useful to countries or regions that must consider medium to long-term volcanic (e.g., nuclear waste facilities). We have begun sample acquisition and isotopic measurements at two stratovolcanoes, Pico de Orizaba in eastern Mexico and Daisen in western Japan.

  11. Twisted mass finite volume effects

    SciTech Connect (OSTI)

    Colangelo, Gilberto; Wenger, Urs; Wu, Jackson M. S.

    2010-08-01

    We calculate finite-volume effects on the pion masses and decay constant in twisted mass lattice QCD at finite lattice spacing. We show that the lighter neutral pion in twisted mass lattice QCD gives rise to finite-volume effects that are exponentially enhanced when compared to those arising from the heavier charged pions. We demonstrate that the recent two flavor twisted mass lattice data can be better fitted when twisted mass effects in finite-volume corrections are taken into account.

  12. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    structure whose behavior is fundamentally nonlinear. Thus, the students assigned to this project will develop control techniques that will allow an electrodynamic shake table to...

  13. Project Construction

    Office of Energy Efficiency and Renewable Energy (EERE)

    Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

  14. project management

    National Nuclear Security Administration (NNSA)

    3%2A en Project Management and Systems Support http:www.nnsa.energy.govaboutusouroperationsapmprojectmanagementandsystemssupport

  15. Custom Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Management Small Industrial Lighting Compressed Air ESUE Motors Federal Agriculture Custom Projects No two industrial customers are alike; each has its own unique...

  16. project management

    National Nuclear Security Administration (NNSA)

    %2A en Project Management and Systems Support http:nnsa.energy.govaboutusouroperationsapmprojectmanagementandsystemssupport

  17. Project Tour

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Tour Transportation Transportation to the tour will be provided from Hilton Santa Fe Buffalo Thunder to Los Alamos National Laboratory, Technical Area 55. After the...

  18. Project Complete

    Broader source: Energy.gov [DOE]

    DOE has published its Record of Decision announcing and explaining DOEs chosen project alternative and describing any commitments for mitigating potential environmental impacts. The NEPA process...

  19. Volume 4 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    and Energy Before the House Committee on Space, Science, and Technology Volume 4 The Science and Energy Plan Careers & Internships Congressional Reports Contact Us Energy.gov...

  20. Yucca Mountain transportation routes: Preliminary characterization and risk analysis; Volume 2, Figures [and] Volume 3, Technical Appendices

    SciTech Connect (OSTI)

    Souleyrette, R.R. II; Sathisan, S.K.; di Bartolo, R.

    1991-05-31

    This report presents appendices related to the preliminary assessment and risk analysis for high-level radioactive waste transportation routes to the proposed Yucca Mountain Project repository. Information includes data on population density, traffic volume, ecologically sensitive areas, and accident history.

  1. Awarded projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    projects Awarded projects 2016 Allocation Awards This page lists the allocation awards for NERSC for the 2016 allocation year (Jan 12, 2016 through Jan 09, 2017). Read More » Previous Year Awards Last edited: 2016-02-01 08:07:34

  2. Natural Propagation and Habitat Improvement, Volume I, Oregon, 1984 Final and Annual Reports.

    SciTech Connect (OSTI)

    Miller, Rod

    1986-02-01

    This volume contains reports on habitat improvement and fisheries enhancement projects conducted in the following subbasins: (1) Clackamas River; (2) Hood River; :(3) Deschutes River; (4) John Day River; (5) Umatilla River; and (6) Grande Ronde River. (ACR)

  3. Liquefied natural gas as a transportation fuel for heavy-duty trucks: Volume I

    SciTech Connect (OSTI)

    1997-12-01

    This document contains Volume 1 of a three-volume manual designed for use with a 2- to 3-day liquefied natural gas (LNG) training course. Transportation and off-road agricultural, mining, construction, and industrial applications are discussed. This volume provides a brief introduction to the physics and chemistry of LNG; an overview of several ongoing LNG projects, economic considerations, LNG fuel station technology, LNG vehicles, and a summary of federal government programs that encourage conversion to LNG.

  4. Development of High-Volume Warm Forming of Low-Cost Magnesium Sheet

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    USAMP AMD 602 - High-Volume Warm Forming of Low-Cost Magnesium Sheet Development of High-Volume Warm Forming of Low-Cost Magnesium Sheet Project ID "LM10" AMD 602 1 This presentation does not contain any proprietary, confidential or otherwise protected information 2010 DOE Merit Review Presentation Prepared by: Peter Friedman, Ford Motor Company USAMP AMD 602 - High-Volume Warm Forming of Low-Cost Magnesium Sheet Acknowledgement This presentation does not contain any proprietary,

  5. Rehab guide: Roofs. Volume 3

    SciTech Connect (OSTI)

    1999-03-01

    Nine volumes will eventually make up The Rehab Guide in its entirety, and they are listed on the back cover of this volume. Each one is devoted to distinct elements of the house, and within each volume is a range of issues that are common to that element of home rehabilitation work. This volume, Roofs, for example, covers the major roofing systems including framing and sheathing; protective strategies such as underlayments and flashing; energy and air infiltration issues; roofing materials; and gutters and down-spouts. Each volume addresses a wide range techniques, materials, and tools, and recommendations based on regional differences around the country. Throughout The Rehab Guide, special attention is given to issues related to energy efficiency, sustainability, and accessibility.

  6. HUD lead-based-paint abatement demonstration (FHA). Volume 2. Appendices i-p

    SciTech Connect (OSTI)

    Not Available

    1991-08-01

    The document is volume 2 of the two-volume appendices accompanying 'The HUD Lead-Based Paint Abatement Demonstration' report. The document contains paint testing, abatement, cleanup and disposal guidelines; the part NIOSH plays in the project; health and safety training manual; tables from Tractor Technology Resources; list of manufacturers; quality assurance project plan for collection and analysis of air and wipe samples; and release of housing unit from the demonstration.

  7. RENOTER Project

    Broader source: Energy.gov [DOE]

    Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE materials, as well as efficient material integration and production process.

  8. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Projects Joint Los Alamos National Laboratory/UCSD Research Projects Collaborations between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Jutta Kayser (505) 663-5649 Email Administrative Assistant Stacy Baker (505) 663-5233 Email "Since 2003, LANL has funded numerous collaborative

  9. CleanFleet. Final report: Volume 1, summary

    SciTech Connect (OSTI)

    1995-12-01

    The South Coast Alternative Fuels Demonstration, called CleanFleet, was conducted in the Los Angeles area from April 1992 through September 1994. The demonstration consisted of 111 package delivery vans operating on five alternative fuels and the control fuel, unleaded gasoline. The alternative fuels were propane gas, compressed natural gas, California Phase 2 reformulated gasoline (RFG), methanol with 15 percent RFG (called M-85), and electricity. This volume of the eight volume CleanFleet final report is a summary of the project design and results of the analysis of data collected during the demonstration on vehicle maintenance and durability, fuel economy, employee attitudes, safety and occupational hygiene, emissions, and fleet economics.

  10. Product Guide Category Prices Volumes

    U.S. Energy Information Administration (EIA) Indexed Site

    Kerosene refiners 2,4,32 3,5,41 prime suppliers - 47 Table U.S. Energy Information Administration Petroleum Marketing Monthly 1 Product Guide Category Prices Volumes No. 1 ...

  11. DOE Project Scorecards

    Broader source: Energy.gov [DOE]

    DOE Project Scorecards DOEproject scorecards summarize capital asset project performance compared to the current approved baseline.

  12. Cloudnet Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Hogan, Robin

    2008-01-15

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  13. The PROJECT

    Office of Scientific and Technical Information (OSTI)

    PROJECT Copies of this publication are available while supply lasts from the Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831 Attention: Information Services Telephone: (423) 576-8401 Also Available: The United States Department of Energy: A Summary History, 1977-1994 @ Printed with soy ink on recycled paper The PROJECT U N I T E D S T A T E S D E P A R T M E N T O F E N E R G Y F.G. Gosling History Division Executive Secretariat Management and Administration

  14. Cloudnet Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Hogan, Robin

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  15. International Linear Collider Technical Design Report - Volume...

    Office of Scientific and Technical Information (OSTI)

    Design Report - Volume 2: Physics Citation Details In-Document Search Title: International Linear Collider Technical Design Report - Volume 2: Physics You are accessing a ...

  16. Request for Proposals for New or Upgraded Transmission Line Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012 Request for ...

  17. PROJECT MANAGEMENT PLANS Project Management Plans

    Office of Environmental Management (EM)

    MANAGEMENT PLANS Project Management Plans  Overview  Project Management Plan Suggested Outline Subjects  Crosswalk between the Suggested PMP Outline Subjects and a Listing of Project Planning Elements  Elements of Deactivation Project Planning  Examples From Project Management Plans Overview The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in

  18. SU-E-J-79: Internal Tumor Volume Motion and Volume Size Assessment Using 4D CT Lung Data

    SciTech Connect (OSTI)

    Jurkovic, I; Stathakis, S; Li, Y; Patel, A; Vincent, J; Papanikolaou, N; Mavroidis, P

    2014-06-01

    Purpose: To assess internal tumor volume change through breathing cycle and associated tumor motion using the 4DCT data. Methods: Respiration induced volume change through breathing cycle and associated motion was analyzed for nine patients that were scanned during the different respiratory phases. The examined datasets were the maximum and average intensity projections (MIP and AIP) and the 10 phases of the respiratory cycle. The internal target volume (ITV) was delineated on each of the phases and the planning target volume (PTV) was then created by adding setup margins to the ITV. Tumor motion through the phases was assessed using the acquired 4DCT dataset, which was then used to determine if the margins used for the ITV creation successfully encompassed the tumor in three dimensions. Results: Results showed that GTV motion along the superior inferior axes was the largest in all the cases independent of the tumor location and/or size or the use of abdomen compression. The extent of the tumor motion was found to be connected with the size of the GTV. The smallest GTVs exhibited largest motion vector independent of the tumor location. The motion vector size varied through the phases depending on the tumor size and location and it was smallest for phases 20 and 30. The smaller the volume of the delineated GTV, the greater its volume difference through the different respiratory phases was. The average GTV volume change was largest for the phases 60 and 70. Conclusion: Even if GTV is delineated using both AIP and MIP datasets, its motion extent will exceed the used margins especially for the very small GTV volumes. When the GTV size is less than 10 cc it is recommended to use fusion of the GTVs through all the phases to create the planning ITV.

  19. International energy outlook. Volume 3. North and South America

    SciTech Connect (OSTI)

    Not Available

    1982-01-01

    Petroleum, coal, and hydropower resources are found, in varying degrees, throughout the Americas. Struggling to maintain or achieve energy self-sufficiency, many North and South American countries are undertaking major projects to develop these, and other, energy sources. This volume, Volume 3 is a compilation of official US government intelligence reports examining the development projects and energy trends in 12 countries of North and South America: Argentina, Bolivia, Brazil, Canada, Colombia, Guatemala, Mexico, Panama, Paraguay, Peru, the United States and Venezuela. The range and detail of country coverage varies, due to availability of reports. Although the book details current energy situations and provides some historical background, its main emphasis is on estimates of future consumption and production, and descriptions of energy programs and plans. Plans in the Americas call for exploiting oil and gas where possible, and making major efforts to develop sources such as coal and hydropower that can be alternatives to imported petroleum. 33 references, 1 figure, 73 tables.

  20. New hydrocracker complex: The master plan study report. Volume 3. Export trade information

    SciTech Connect (OSTI)

    1995-06-16

    The study, conducted by ABB Lummus Crest, was funded by the U.S. Trade and Development Agency. The purpose of the Master Plan is to aid in the implementation of the new hydrocracker complex at the Kirishi Refinery in Kirishi, Russia. The report contains financial information, including the project costs and the development of a financing plan. Also covered in the study is a marketing plan for both the domestic and export scenarios for products produced by the complex. This is Volume 3 of a three volume report and is divided into the following sections: (5) Marketing Plan; (6) Project Costs and Economics; (7) Project Execution. Appendix C follows.

  1. Fort Drum integrated resource assessment. Volume 3, Resource assessment

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Daellenbach, K.K.; Dagle, J.E.; Di Massa, F.V.; Elliott, D.B.; Keller, J.M.; Richman, E.E.; Shankle, S.A.; Sullivan, G.P.; Wahlstrom, R.R.

    1992-12-01

    The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at one of Niagara Mohawk`s primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 2, the Baseline Detail.

  2. Fort Irwin Integrated Resource Assessment. Volume 2, Baseline detail

    SciTech Connect (OSTI)

    Richman, E.E.; Keller, J.M.; Dittmer, A.L.; Hadley, D.L.

    1994-01-01

    This report documents the assessment of baseline energy use at Fort Irwin, a US Army Forces Command facility near Barstow, California. It is a companion report to Volume 1, Executive Summary, and Volume 3, Integrated Resource Assessment. The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Irwin. This is part of a model program that PNL has designed to support energy-use decisions in the federal sector. This program (1) identifies and evaluates all cost-effective energy projects; (2) develops a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) targets 100% of the financing required to implement energy efficiency projects. PNL applied this model program to Fort Irwin. This analysis examines the characteristics of electric, propane gas, and vehicle fuel use for a typical operating year. It records energy-use intensities for the facilities at Fort Irwin by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that accounts for all energy use among buildings, utilities, and applicable losses.

  3. October 2011 Energy Assurance Planning Bulletin Volume 2 No 4

    Energy Savers [EERE]

    3, 2011 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 2, NUMBER 4 Need to Know Fourth DOE/OE Regional Tabletop Exercise Action Items DOE to Request Sharing of State EA Plans Exercise and Reporting Deadlines News from the States Revolving Loan Funded Hydro Projects Help to Power Nevada Energy Assurance Success Stories Midwest Regional Exercise Recap Other Useful Information and Links New PTI Resources DOE/OE Year-in-Review: 2010 Report Upcoming Events Winter Fuels Outlook NARUC Annual Meeting

  4. October 2012 Energy Assurance Planning Bulletin Volume 3 No 4

    Energy Savers [EERE]

    OCTOBER 1, 2012 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 3, NUMBER 4 Need to Know Program Recap Action Items Quarterly and Project Close- Out Reports Due Energy Assurance Success Stories Portland, Oregon's Community-Wide Approach to Local Government Energy Assurance Planning News from the States North Carolina reaps benefits from SLEAP Upcoming Events GridWeek 2012 DOE Winter Fuels Outlook Conference ASERTTI Fall Meeting NMU "The Basics" Courses World Energy Engineering

  5. High air volume to low liquid volume aerosol collector

    DOE Patents [OSTI]

    Masquelier, Donald A. (Tracy, CA); Milanovich, Fred P. (Lafayette, CA); Willeke, Klaus (Cincinnati, OH)

    2003-01-01

    A high air volume to low liquid volume aerosol collector. A high volume flow of aerosol particles is drawn into an annular, centripetal slot in a collector which directs the aerosol flow into a small volume of liquid pool contained is a lower center section of the collector. The annular jet of air impinges into the liquid, imbedding initially airborne particles in the liquid. The liquid in the pool continuously circulates in the lower section of the collector by moving to the center line, then upwardly, and through assistance by a rotating deflector plate passes back into the liquid at the outer area adjacent the impinging air jet which passes upwardly through the liquid pool and through a hollow center of the collector, and is discharged via a side outlet opening. Any liquid droplets escaping with the effluent air are captured by a rotating mist eliminator and moved back toward the liquid pool. The collector includes a sensor assembly for determining, controlling, and maintaining the level of the liquid pool, and includes a lower centrally located valve assembly connected to a liquid reservoir and to an analyzer for analyzing the particles which are impinged into the liquid pool.

  6. Hydropower Projects

    SciTech Connect (OSTI)

    2015-04-02

    The Water Power Program helps industry harness this renewable, emissions-free resource to generate environmentally sustainable and cost-effective electricity. Through support for public, private, and nonprofit efforts, the Water Power Program promotes the development, demonstration, and deployment of advanced hydropower devices and pumped storage hydropower applications. These technologies help capture energy stored by diversionary structures, increase the efficiency of hydroelectric generation, and use excess grid energy to replenish storage reserves for use during periods of peak electricity demand. In addition, the Water Power Program works to assess the potential extractable energy from domestic water resources to assist industry and government in planning for our nation’s energy future. From FY 2008 to FY 2014, DOE’s Water Power Program announced awards totaling approximately $62.5 million to 33 projects focused on hydropower. Table 1 provides a brief description of these projects.

  7. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Past Research Projects Composite-to-Steel Joint Integrity Monitoring and Assessment Collaboration between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Ellie Vigil (505) 667-2818 Email Administrative Assistant Rebecca Duran (505) 665-8899 Email UCSD Faculty and Graduate Students Professor

  8. MONTICELLO PROJECTS

    Office of Legacy Management (LM)

    09 January 2010 Doc. No. S06172 Page 1 1.3 Peripheral Properties (Private and City-Owned) * No land use or supplemental standards compliance issues were observed or reported by LTSM on-site staff. Monticello National Priorities List Sites Federal Facilities Agreement (FFA) Quarterly Report: October 1-December 31, 2009 This report summarizes project status and activities implemented October through December 2009, and provides a schedule of near-term activities for the Monticello Mill Tailings

  9. MONTICELLO PROJECTS

    Office of Legacy Management (LM)

    1 July 2011 Doc. No. S07978 Page 1 Monticello, Utah, National Priorities List Sites Federal Facility Agreement (FFA) Quarterly Report: April 1-June 30, 2011 This report summarizes project status and activities implemented April through June 2011 and provides a schedule for near-term activities at the Monticello Vicinity Properties (MVP) site and the Monticello Mill Tailings Site (MMTS) located in and near Monticello, Utah. The MMTS and MVP were placed on the U.S. Environmental Protection Agency

  10. MONTICELLO PROJECTS

    Office of Legacy Management (LM)

    31, 2011 April 2011 Doc. No. S07666 Page 1 Monticello, Utah, National Priorities List Sites Federal Facility Agreement (FFA) Quarterly Report: January 1-March 31, 2011 This report summarizes project status and activities implemented January through March 2011 and provides a schedule for near-term activities at the Monticello Vicinity Properties (MVP) site and the Monticello Mill Tailings Site (MMTS) located in and near Monticello, Utah. The MMTS and MVP were placed on the U.S. Environmental

  11. Hallmark Project

    Office of Environmental Management (EM)

    Project Commercialization of the Secure SCADA Communications Protocol, a cryptographic security solution for device-to-device communication Increased connectivity and automation in the control systems that manage the nation's energy infrastructure have improved system functionality, but left systems more vulnerable to cyber attack. Intruders could severely disrupt control system operation by sending fabricated information or commands to control system devices. To ensure message integrity,

  12. Approved Site Treatment Plan, Volumes 1 and 2. Revision 4

    SciTech Connect (OSTI)

    Helmich, E.H.; Molen, G.; Noller, D.

    1996-03-22

    The US Department of Energy, Savannah River Operations Office (DOE-SR), has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume 1. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore, pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE`s requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021. Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW. The Compliance Plan Volume (Volume 1) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume 2) and is provided for information.

  13. PROJECT MANGEMENT PLAN EXAMPLES Project Organization Examples

    Office of Environmental Management (EM)

    Organization Examples Example 8 4.0 PROJECT ORGANIZATION Chapter 4.0 describes the principle project organizations, including their responsibilities and relationships. Other organizations, that have an interest in the project, also are described. 4.1 Principal Project Organizations and Responsibilities The management organization for the 324/327 Buildings Stabilization/Deactivation Project represents a partnership between four principal project organizations responsible for the project. The four

  14. PATRAM '80. Proceedings. Volume 1

    SciTech Connect (OSTI)

    Huebner, H.W.

    1980-01-01

    Volume 1 contains papers from the following sessions: Plenary Session; Regulations, Licensing and Standards; LMFBR Systems Concepts; Risk/Safety Assessment I; Systems and Package Design; US Institutional Issues; Risk/Safety Assessment II; Leakage, Leak Rate and Seals; Poster Session A; Operations and Systems Experience I; Manufacturing Processes and Materials; and Quality Assurance and Maintenance. Individual papers were processed. (LM)

  15. PATRAM '80. Proceedings. Volume 2

    SciTech Connect (OSTI)

    Huebner, H.W.

    1980-01-01

    Volume 2 contains papers from the following sessions: Safeguards-Related Problems; Neutronics and Criticality; Operations and Systems Experience II; Plutonium Systems; Intermediate Storage in Casks; Operations and Systems Planning; Institutional Issues; Structural and Thermal Evaluation I; Poster Session B; Extended Testing I; Structural and Thermal Evaluation II; Extended Testing II; and Emergency Preparedness and Response. Individual papers were processed. (LM)

  16. MHK Projects/Manchac Point Project | Open Energy Information

    Open Energy Info (EERE)

    el":"","visitedicon":"" Project Profile Project Start Date 112008 Project City St Gabriel, LA Project StateProvince Louisiana Project Country United States Project Resource...

  17. MHK Projects/Claiborne Island Project | Open Energy Information

    Open Energy Info (EERE)

    el":"","visitedicon":"" Project Profile Project Start Date 112008 Project City St Gabriel, LA Project StateProvince Louisiana Project Country United States Project Resource...

  18. MHK Projects/Point Pleasant Project | Open Energy Information

    Open Energy Info (EERE)

    el":"","visitedicon":"" Project Profile Project Start Date 112008 Project City St Gabriel, LA Project StateProvince Louisiana Project Country United States Project Resource...

  19. MHK Projects/College Point Project | Open Energy Information

    Open Energy Info (EERE)

    bel":"","visitedicon":"" Project Profile Project Start Date 112008 Project City St James, LA Project StateProvince Louisiana Project Country United States Project Resource...

  20. VOLUME

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 P H Y S I C A L R E V I E W L E T T E R S 4 SEPTEMBER 2000 Control of Density ... multichord arrays for the detection of both H a D a and soft x-ray radiation to ...

  1. VOLUME

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, NUMBER 10 P H Y S I C A L R E V I E W L E T T E R S 8 SEPTEMBER 1997 Enhanced ... Particle content increases and H a radiation decreases upon application of bias and global ...

  2. VOLUME

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PPCD. The transition of the fluctuation to its low value coincides with a small saw- tooth in this and many improved PPCD plasmas. This is probably related to an abrupt but...

  3. VOLUME

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in a typical MST discharge. the cause of the sudden changes in rotation during saw- tooth crashes. First, we measure correlated triple products of three modes, and observe that...

  4. Volumes

    U.S. Energy Information Administration (EIA) Indexed Site

    W W 843.8 W W 2,188.3 W W 193.2 133.6 - 326.8 November ... W W 818.4 1,151.9 NA 1,984.1 W W 189.5 127.0 - 316.5 December ... W W W...

  5. Volumes

    U.S. Energy Information Administration (EIA) Indexed Site

    W 2,734.4 W W W W - 243.3 May ... W W 898.3 W W 2,818.3 W W W W - 255.4 June ... W W 919.7 W W 2,841.1 W W...

  6. Volumes

    U.S. Energy Information Administration (EIA) Indexed Site

    13,752.8 14,204.9 16,837.5 52,025.3 9,480.0 78,342.8 2,675.9 2,738.6 2,823.0 4,995.6 - 7,818.6 August ... 13,908.8 14,400.4 17,863.9 53,248.7 8,114.1...

  7. VOLUME

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 P H Y S I C A L R E V I E W L E T T E R S 17 JULY 2000 Spectroscopic Observation of Fluctuation-Induced Dynamo in the Edge of the Reversed-Field Pinch P. W. Fontana, D. J. Den...

  8. Volumes

    U.S. Energy Information Administration (EIA) Indexed Site

    39,569.3 40,215.9 122,708.5 26,876.5 189,800.8 10,466.7 10,604.8 10,129.5 14,302.8 - 24,432.4 February ... 40,637.5 41,953.1 43,328.9 133,687.6...

  9. VOLUME

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0, NUMBER 10 P H Y S I C A L R E V I E W L E T T E R S 9 MARCH 1998 Strong E 3 B Flow Shear and Reduced Fluctuations in a Reversed-Field Pinch B. E. Chapman, C.-S. Chiang, S. C. Prager, J. S. Sarff, and M. R. Stoneking Department of Physics, University of Wisconsin, Madison, Wisconsin 53706 (Received 8 May 1997) Large radial electric field gradients, leading to sheared E 3 B flow, are observed in enhanced confinement discharges in the Madison Symmetric Torus reversed-field pinch. The flow shear

  10. VOLUME

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    role in the fluctuation structure. These experiments also report that the sign of the flux can actually reverse in the region of the shear flow, an effect not predicted by the...

  11. VOLUME

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    18 P H Y S I C A L R E V I E W L E T T E R S 6 MAY 2002 Measurement of the Current-Density Profile and Plasma Dynamics in the Reversed-Field Pinch D. L. Brower, W. X. Ding, and...

  12. VOLUME

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hussey, and R. E. Peterkin, Jr., IEEE Trans. Plasma Sci. 23, 83 (1995). 14 K. F. Schoenberg, R. A. Gerwin, R. W. Moses, Jr., J. T. Scheuer, and H. P. Wagner, Phys. Plasmas 5,...

  13. VOLUME

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Improved Confinement in the MST Reversed-Field Pinch B. E. Chapman, 1, * J. K. Anderson, 1 T. M. Biewer, 1 D. L. Brower, 2 S. Castillo, 1 P. K. Chattopadhyay, 1 C.-S....

  14. FUSRAP Project

    Office of Legacy Management (LM)

    Project 23b 14501 FUSRAP TECHNICAL BULLETIN N O . - R 3 v . L DATE: 1.2 9-99 SUBJECT : Pr.pec.d BY T r m L u d Approval Summary of the results for the Springdale characterization activities performed per WI-94-015, Rev. 0. TUO separate radiological characterization surveys and a limited cherical characterization survey were performed on the Springdale Site in Octcjer and December, 1993. The design of the radiological surveys were to supplement and define existing ORNL surveys. The limited

  15. Site Environmental Report for 2005 Volume I and Volume II

    SciTech Connect (OSTI)

    Ruggieri, Michael

    2006-07-07

    Each year, Ernest Orlando Lawrence Berkeley National Laboratory prepares an integrated report on its environmental programs to satisfy the requirements of United States Department of Energy Order 231.1A, ''Environment, Safety, and Health Reporting''. The ''Site Environmental Report for 2005'' summarizes Berkeley Lab's environmental management performance, presents environmental monitoring results, and describes significant programs for calendar year 2005. (Throughout this report, Ernest Orlando Lawrence Berkeley National Laboratory is referred to as ''Berkeley Lab'', ''the Laboratory'', ''Lawrence Berkeley National Laboratory'', and ''LBNL''.) The report is separated into two volumes. Volume I contains an overview of the Laboratory, the status of environmental programs, and summarized results from surveillance and monitoring activities. This year's Volume I text body is organized into an executive summary followed by six chapters. The report's structure has been reorganized this year, and it now includes a chapter devoted to environmental management system topics. Volume II contains individual data results from surveillance and monitoring activities. The ''Site Environmental Report'' is distributed by releasing it on the Web from the Berkeley Lab Environmental Services Group (ESG) home page, which is located at http://www.lbl.gov/ehs/esg/. Many of the documents cited in this report also are accessible from the ESG Web page. CD and printed copies of this Site Environmental Report are available upon request. The report follows the Laboratory's policy of using the International System of Units (SI), also known as the metric system of measurements. Whenever possible, results are also reported using the more conventional (non-SI) system of measurements, because the non-SI system is referenced by several current regulatory standards and is more familiar to some readers. Two tables are provided at the end of the Glossary to help readers: the first defines the prefixes used with SI units of measurement, and the second provides conversions to non-SI units.

  16. Notice of Availability of Plains & Eastern Clean Line Transmission Project

    Energy Savers [EERE]

    Draft Environmental Impact Statement and Public Hearings: Federal Register Notice, Volume 79, No. 242 - Dec. 17, 2014 | Department of Energy Availability of Plains & Eastern Clean Line Transmission Project Draft Environmental Impact Statement and Public Hearings: Federal Register Notice, Volume 79, No. 242 - Dec. 17, 2014 Notice of Availability of Plains & Eastern Clean Line Transmission Project Draft Environmental Impact Statement and Public Hearings: Federal Register Notice, Volume

  17. Capital Project Prioritization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Capital-Project-Prioritization Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects &...

  18. Report to Congress on the U.S. Department of Energy`s Environmental Management Science Program: Research funded and its linkages to environmental cleanup problems, and high out-year cost environmental management project descriptions. Volume 3 of 3 -- Appendix C

    SciTech Connect (OSTI)

    1998-04-01

    The Department of Energy`s Environmental Management Science Program (EMSP) serves as a catalyst for the application of scientific discoveries to the development and deployment of technologies that will lead to reduction of the costs and risks associated with cleaning up the nation`s nuclear complex. Appendix C provides details about each of the Department`s 82 high cost projects and lists the EMSP research awards with potential to impact each of these projects. The high cost projects listed are those having costs greater than $50 million in constant 1998 dollars from the year 2007 and beyond, based on the March 1998 Accelerating Cleanup: Paths to Closure Draft data, and having costs of quantities of material associated with an environmental management problem area. The high cost project information is grouped by operations office and organized by site and project code. Each operations office section begins with a list of research needs associated with that operations office. Potentially related research awards are listed by problem area in the Index of Research Awards by Environmental Management Problem Area, which can be found at the end of appendices B and C. For projects that address high risks to the public, workers, or the environment, refer also the Health/Ecology/Risk problem area awards. Research needs are programmatic or technical challenges that may benefit from knowledge gained through basic research.

  19. Project Grandmaster

    Energy Science and Technology Software Center (OSTI)

    2013-09-16

    The purpose of the Project Grandmaster Application is to allow individuals to opt-in and give the application access to data sources about their activities on social media sites. The application will cross-reference these data sources to build up a picture of each individual activities they discuss, either at present or in the past, and place this picture in reference to groups of all participants. The goal is to allow an individual to place themselves inmore » the collective and to understand how their behavior patterns fit with the group and potentially find changes to make, such as activities they weren’t already aware of or different groups of interest they might want to follow.« less

  20. Project Grandmaster

    SciTech Connect (OSTI)

    2013-09-16

    The purpose of the Project Grandmaster Application is to allow individuals to opt-in and give the application access to data sources about their activities on social media sites. The application will cross-reference these data sources to build up a picture of each individual activities they discuss, either at present or in the past, and place this picture in reference to groups of all participants. The goal is to allow an individual to place themselves in the collective and to understand how their behavior patterns fit with the group and potentially find changes to make, such as activities they weren?t already aware of or different groups of interest they might want to follow.

  1. International Linear Collider Technical Design Report (Volumes 1 through 4)

    SciTech Connect (OSTI)

    Harrison M.

    2013-03-27

    The design report consists of four volumes: Volume 1, Executive Summary; Volume 2, Physics; Volume 3, Accelerator (Part I, R and D in the Technical Design Phase, and Part II, Baseline Design); and Volume 4, Detectors.

  2. Project Management Lessons Learned

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-08-05

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and aids the federal project directors and integrated project teams in the execution of projects.

  3. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Capital Asset Line Item Projects: (Pre-RCACAP) Projects completed within 110% of CD-2 ... Projects: (Pre- RACCAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. ...

  4. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    90% of projects completed within 110% of CD-2 TPC by FY11. 80% - Two projects completed ... projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup ...

  5. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects: (Pre-RCACAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. ... Projects: (Pre- RACCAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. ...

  6. Volume International: Order (2014-CE-32014)

    Broader source: Energy.gov [DOE]

    DOE ordered Volume International Corporation to pay a $8,000 civil penalty after finding Volume International had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  7. Western Interconnection Synchrophasor Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Demonstration Project Western Interconnection Synchrophasor Project Resources & Links Demand Response Energy Efficiency Emerging Technologies Synchrophasor measurements are a...

  8. Project File System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project File System Project File System Overview The project file system is a global file system available on all NERSC computational systems. It allows sharing of data between users, systems, and/or (via science gateways) the "outside world". Default project directories are provided to every MPP project. Additional project directories can be provided upon request. Purging No, files in project directories are not subject to purging. Backup Daily backups are performed for project

  9. Community Renewables Projects

    Broader source: Energy.gov [DOE]

    This webinar covered introduction and barriers to individual renewable projects, resources for community and group buy projects, and permitting guidelines.

  10. OMAE 1993: Proceedings. Volume 5: Pipeline technology

    SciTech Connect (OSTI)

    Yoon, M.; Murray, A.; Thygesen, J.

    1993-01-01

    This volume of conference proceedings is volume five of a five volume series dealing with offshore and arctic pipeline, marine riser, platforms, and ship design and engineering. This volume is a result of increased use of pipeline transportation for oil, gas, and liquid products and the resultant need for lower design and operating costs. Papers in this conference cover topics on environmental considerations, pipeline automation, computer simulation techniques, materials testing, corrosion protection, permafrost problems, pipeline integrity, geotechnical concerns, and offshore engineering problems.

  11. New hydrocracker complex: The master plan study report, volume 2. Export trade information

    SciTech Connect (OSTI)

    1995-06-16

    The study, conducted by ABB Lummus Crest, was funded by the U.S. Trade and Development Agency. The purpose of the Master Plan is to aid in the implementation of the new hydrocracker complex at the Kirishi Refinery in Russia. The report contains financial information, including the project costs and the development of a financing plan. Also covered in the study is a marketing plan for both the domestic and export scenarios for products produced by the complex. This is Volume 2 of a three volume report and it is divided into the following sections: (2) Background and Introduction; (3) Project Profile; (4) Safety. Appendixes A and B follow.

  12. MHK Projects/Admirality Inlet Tidal Energy Project | Open Energy...

    Open Energy Info (EERE)

    eLabel":"","visitedicon":"" Project Profile Project Start Date 112006 Project City Port Townsend, WA Project StateProvince Washington Project Country United States...

  13. Demonstration project Smart Charging (Smart Grid Project) | Open...

    Open Energy Info (EERE)

    Smart Grid Projects Smart Grid Projects in Europe Smart Grid Projects - Grid Automation Distribution Smart Grid Projects - Integrated System Smart Grid Projects - Home...

  14. Preparing for Project Implementation Financing Project Implementation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 11, 2010 9 - Preparing for Project Implementation Financing Project Implementation Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference Agenda  Seminar Series Overview  Recap Seminar # 8 - "Announcing the PRIZE"  Financing Project Implementation Fred Schoeneborn - ORNL team Robert Varcoe - UAW & General Motors  Questions/Future Seminars Save Energy Now LEADER Web Conference Project Implementation Series

  15. Breckinridge Project, initial effort. Report II. Breckinridge Project design basis

    SciTech Connect (OSTI)

    1982-01-01

    The Breckinridge Project is a pioneer endeavor involving the engineering, construction, and operation of a commercial facility that will convert 23,000 tons per day of run-of-mine, high-sulfur coal into 50,000 barrels per day of liquid hydrocarbons equivalent to those produced from crude oil. The Initial Effort, now complete, was executed under Cooperative Agreement No. DE-FC05-80OR20717 between the Department of Energy and the Participants, Ashland Synthetic Fuels, Inc., and Airco Energy Company, Inc. The Initial Effort produced a preliminary design, capital estimate, and economic analysis of the commercial plant, as well as a plan for the design, construction, and operation of that plant. The extensive and rigorous attention given to environmental, socioeconomic, safety, and health considerations is indicative of the high priority these issues will continue to receive throughout the life of the project. The Breckinridge Energy Company, a partnership of several major corporations, is being formed to finance, own, and manage the Breckinridge Project. Report II is intended for the reader who is primarily interested in less detailed discussion of the coal liquefaction process and Breckinridge facility than presented in the eleven volumes of Reports IV and V. The overview section describes the project goals and briefly introduces the coal liquefaction process. The report continues with a discussion of the history of the project and the H-COAL process from its concept to the proposed commercialization technology. The report describes the site, the Breckinridge Facility, and concludes with a summary of the eleven reports that contain the deliverable documentation of the Initial Effort or Development Phase of the project.

  16. Fort Drum integrated resource assessment. Volume 2, Baseline detail

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Brodrick, J.R.; Daellenbach, K.K.; Di Massa, F.V.; Keller, J.M.; Richman, E.E.; Sullivan, G.P.; Wahlstrom, R.R.

    1992-12-01

    The US Army Forces Command (FORSCOM) has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company. It will identify and evaluate all electric and fossil fuel cost-effective energy projects; develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk`s primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Resource Assessment. This analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. It records energy-use intensities for the facilities at Fort Drum by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that includes the accounting of all energy use among buildings, utilities, central systems, and applicable losses.

  17. Griffiss AFB integrated resource assessment. Volume 2, Electric baseline detail

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Keller, J.M.

    1993-02-01

    The US Air Force Air Combat Command has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Griffiss Air Force Base (AFB). This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk`s primary federal facilities, Griffiss AFB, an Air Combat Command facility located near Rome, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Electric Resource Assessment. The analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. The results include energy-use intensities for the facilities at Griffiss AFB by building type and electric energy end use. A complete electric energy consumption reconciliation is presented that accounts for the distribution of all major electric energy uses and losses among buildings, utilities, and central systems.

  18. Petroleum supply annual 1993. Volume 1

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    The Petroleum Supply Annual (PSA) contains information on the supply and disposition of crude oil and petroleum products. The publication reflects data that were collected from the petroleum industry during 1993 through annual and monthly surveys. The PSA is divided into two volumes. This first volume contains four sections: Summary Statistics, Detailed Statistics, Refinery Capacity, and Oxygenate Capacity each with final annual data. The second volume contains final statistics for each month of 1993, and replaces data previously published in the Petroleum Supply Monthly (PSM). The tables in Volumes 1 and 2 are similarly numbered to facilitate comparison between them. Below is a description of each section in Volume 1 of the PSA.

  19. Petroleum supply annual 1994. Volume 1

    SciTech Connect (OSTI)

    1995-05-22

    The Petroleum Supply Annual (PSA) contains information on the supply and disposition of crude oil and petroleum products. The publication reflects data that were collected from the petroleum industry during 1994 through annual and monthly surveys. The PSA is divided into two volumes. This first volume contains four sections: Summary Statistics, Detailed Statistics, Refinery Capacity, and Oxygenate Capacity each with final annual data. The second volume contains final statistics for each month of 1994, and replaces data previously published in the Petroleum Supply Monthly (PSM). The tables in Volumes 1 and 2 are similarly numbered to facilitate comparison between them. Below is a description of each section in Volume 1 of the PSA.

  20. Step 3: Project Refinement

    Energy Savers [EERE]

    3: Project Refinement 2 1 Potential 3 Refinement 4 Implementation 5 Operations & Maintenance 2 Options 3 Refinement 1/28/2016 2 3 FUNDING AND FINANCING OPTIONS Project Ownership Financing structure is highly dependent on size of the project and the capital available for a given project: * Tribe owns the project (cash purchase or debt) * Tribe hosts the project and buys the electricity (power purchase agreement) * Tribe partners with private sector and co-owns the project (uncertainties about

  1. High-Temperature-High-Volume Lifting for Enhanced Geothermal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    High-Temperature-High-Volume Lifting for Enhanced Geothermal Systems High-Temperature-High-Volume Lifting for Enhanced Geothermal Systems High-Temperature-High-Volume Lifting for ...

  2. Ironmaking conference proceedings. Volume 54

    SciTech Connect (OSTI)

    1995-12-01

    The technical presentations at this conference displayed a renewed sense of viability of the coke and ironmaking community. In addition, many of the papers show that the environmental aspects of ironmaking are being integrated into day-to-day operations rather than being thought of as separate responsibilities. This volume contains 68 papers divided into the following sections: Blast furnace injection; Blast furnace fundamental studies; Blast furnace general; Blast furnace repairs/rebuilds/modernization; Process control techniques for blast furnaces; Cokemaking general; Cokemaking environmental; Coke--by-products--plant operations; Coal and coke research; Battery operations; Pelletizing; Direct reduction and smelting; and Sintering. Most of the papers have been processed separately for inclusion on the data base.

  3. Information architecture. Volume 3: Guidance

    SciTech Connect (OSTI)

    1997-04-01

    The purpose of this document, as presented in Volume 1, The Foundations, is to assist the Department of Energy (DOE) in developing and promulgating information architecture guidance. This guidance is aimed at increasing the development of information architecture as a Departmentwide management best practice. This document describes departmental information architecture principles and minimum design characteristics for systems and infrastructures within the DOE Information Architecture Conceptual Model, and establishes a Departmentwide standards-based architecture program. The publication of this document fulfills the commitment to address guiding principles, promote standard architectural practices, and provide technical guidance. This document guides the transition from the baseline or defacto Departmental architecture through approved information management program plans and budgets to the future vision architecture. This document also represents another major step toward establishing a well-organized, logical foundation for the DOE information architecture.

  4. Energy self-sufficiency for the County of Kauai. Volume 2. General energy plan

    SciTech Connect (OSTI)

    Kai, K.; Browne, S.; Hahn, Y.; Seki, A.

    1980-06-01

    Volume 1 of this study presented background information concerning the environment, the economy, past trends in the use of energy, and potentially available natural energy resources of Kauai. In Section II of this volume, Vol. 2, present energy-use patterns are described, updating the data of Volume 1 through 1978. Based upon past trends, three plausible scenarios of future economic growth and the corresponding projections of future energy demand are developed in Section III. Potential sources of energy to meet projected demands are discussed in Section IV, including conservation and indigenous energy resources. The present state of energy technology and its implications for Kauai are reviewed, economic factors and environmental impact issues that will influence selection of sources are discussed, and current and planned RD and D programs are described. Section V presents an energy-supply projection to be used in subsequent analysis. It represents a reasonable growth pattern in which sources available immediately and in the near future, conservation, biomass, solar water heating, and wind, are utilized in earlier years, augmented by solar power generation and ocean energy conversion, as they might be expected to become available. The results of analysis of the impact of this supply projection on each projected demand are discussed, including some economic impacts and alternatives that might increase future supply when projected supplies fall short of demand. Some general conclusions are drawn in Section VI.

  5. Project Reports for Haida Corporation- 2010 Project

    Broader source: Energy.gov [DOE]

    The Reynolds Creek Hydroelectric Project ("Reynolds Creek" or the "Project") is a 5 MW hydroelectric resource to be constructed on Prince of Wales Island, Alaska, approximately 10 miles east of Hydaburg.

  6. Project Information Form for Usability Projects

    Broader source: Energy.gov [DOE]

    For user-centered design projects such as a survey or card sort, complete the user-centered design project information form and send it to the Web Governance Team facilitator.

  7. Project Reports for Chickasaw Nation- 2010 Project

    Broader source: Energy.gov [DOE]

    Under this project, the Chickasaw Nation, Division of Commerce (CNDC) will upgrade old, inefficient lighting systems throughout CNDC to new, energy saving systems. Learn more about this project or...

  8. Step 4: Project Implementation

    Energy Savers [EERE]

    Process Step 4: Project Implementation Presentation Agenda * Step 4: Project Implementation - Pre-construction - Contract execution - Interconnection - Project construction - Commissioning * Project Example 2 1/28/2016 2 1 Potential 3 Refinement 5 Operations & Maintenance 2 Options 4 Implementation 4 Implementation 3 Potential Options Refinement Implementation Operations & Maintenance Step 4: Implementation 4 Purpose: Contract and begin physical construction of project Tasks: * Finalize

  9. MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT

    Office of Legacy Management (LM)

    August/September 2005 Report Period: July 1- September 30, 2005 DOE Project Coordinator: Art Kleinrath HIGHLIGHTS The draft-final Monticello Long-Term Surveillance and Afaintenance Operating Procedures for Swface and Ground Water (Volume III) and draft-final Annual Data Summmy Report for Operable Unit Ill of the Monticello Mill Tailings Site, October 2004 through April 2005 were completed. MRAP The annual inspection of the Monticello Mill Tailings Site and the Monticello Vicinity Properties was

  10. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of projects completed within 110% of CD-2 TPC by FY11. 80% - No 1 st Qtr FY09 completions. ... projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup ...

  11. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    90% of projects completed within 110% of CD-2 TPC by FY11. 75% 76% This is a 3-year ... projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup ...

  12. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCACAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: ...

  13. International and Domestic Market Opportunities for Biomass Power: Volumes I and II

    SciTech Connect (OSTI)

    Not Available

    1998-09-01

    This report examines the domestic and international markets for biopower. Domestic and foreign markets present fundamentally different challenges to private power developers. Volume I focuses on the domestic market for biopower. The domestic challenge lies in finding economically viable opportunities for biopower. Vol. I outlines the current state of the U.S. biomass industry, discusses policies affecting biomass development, describes some demonstration projects currently underway, and discusses the future direction of the industry. Volume II focuses on the international market for biopower. Recent literature states that the electricity investment and policy climate in foreign markets are the key elements in successful private project development. Vol. II discusses the financing issues, policy climate, and business incentives and barriers to biopower development. As India and China are the largest future markets for biopower, they are the focus of this volume. Three other top markets- -Brazil, Indonesia, and the Philippines--are also discussed. Potential financial resources wrap up the discussion.

  14. Petroleum supply annual 1995: Volume 1

    SciTech Connect (OSTI)

    1996-05-01

    The {ital Petroleum Supply Annual} contains information on supply and disposition of crude oil and petroleum products. It reflects data collected from the petroleum industry during 1995 through monthly surveys, and it is divided into 2 volumes. This volume contains three sections: summary statistics, detailed statistics, and selected refinery statistics, each with final annual data. (The other volume contains final statistics for each month and replaces data previously published in the {ital Petroleum Supply Monthly}).

  15. Constant Volume During Combustion | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Constant Volume During Combustion Constant Volume During Combustion This presentation covers constant volume during combustion and discusses how it can alter the kinematics of piston to crankshaft travel. PDF icon deer08_joniec.pdf More Documents & Publications Utilizing the Rapid Ignition Region of HCCI to Attain > 60% BTE 50% thermo-mechanical efficiency utilizing a free-piston engine in Hybrid vehicles DOE-HDBK-1018/1-93

  16. Surface and Volume Contamination | Department of Energy

    Energy Savers [EERE]

    Surface and Volume Contamination Surface and Volume Contamination (Questions Posted to ERAD in May 2012) Will there be volume contamination/activation guides as well as updated contamination guides? The only guidance being developed for volumetric contamination is a Technical Standard for accelerator facilities. However, a revised version of ANSI N13.12-1999 is expected in the future and it will be assessed to determine its acceptability for use as a pre-approved authorized limit. It is noted

  17. Buckman Direct Diversion Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Buckman Direct Diversion Project Buckman Direct Diversion Project This project takes surface water from the Rio Grande, and then treats and distributes these waters to the city and county of Santa Fe through their drinking water distribution systems. August 1, 2013 Water flumes at Buckman Direct Diversion Project Water flumes at Buckman Direct Diversion Project The City of Santa Fe and Santa Fe County completed the construction of the Buckman Direct Diversion (BDD) Project in December 2010. The

  18. Perspectives on Project Finance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Finance July 29 2014 Project Company (Borrower) Off-take Agreements Feedstock Agreements O&M Agreement EPC Contract (construct) Technology License Agreements Sponsor's Equity Project Level Equity Investors Senior Project Debt Providers Equity Investors Typical Project Finance Structure 2 SOUND PROJECT ECONOMICS Leads to Adequate Debt Service Coverage And Acceptable Equity Returns Market Risk Assessment Competitive positioning. Supply / demand forecasts. Competing suppliers.

  19. PROJECT MANGEMENT PLAN EXAMPLES

    Office of Environmental Management (EM)

    Baselines - Performance Baseline Examples Example 34 6.0 PROJECT BASELINE This section presents a summary of the PFP Stabilization and Deactivation Project baseline, which was prepared by an inter- contractor team to support an accelerated planning case for the project. The project schedules and associated cost profiles presented in this section are compared to the currently approved project baseline, as contained in the Facility Stabilization Project Fiscal Year 1999 Multi-Year Work Plan (MYWP)

  20. Bradys EGS Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bradys EGS Project DOE: DE-FG36-08GO18200 Kyle Snyder Ezra Zemach Ormat Nevada Inc. Project Officer: Bill Vandermeer Total Project Funding: $6.6M April 22nd, 2013 This presentation does not contain any proprietary confidential, or otherwise restricted information. Insert photo of your choice 2 | US DOE Geothermal Program eere.energy.gov - Timeline * Project start date: September 2008, contract singed on June 2009 * Project end date: December 2013 * percent complete: ~50% - Budget * Total project

  1. Projects | Department of Energy

    Energy Savers [EERE]

    Projects Projects The U.S. Department of Energy supports a variety of energy-related projects on tribal lands. Through these projects, tribes have built the institutional capacity to manage their energy needs, assessed the feasibility of energy efficiency and renewable energy installation, and demonstrated the viability of installing renewable energy systems on tribal lands. View a map of projects, get information on project funding history, learn about Tribal Energy Deployment Program staff,

  2. PARC Periodical | Volume 6, Issue 5 | Photosynthetic Antenna Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center Volume 6, Issue 5 June 3, 2015 PARC Periodical | Volume 6, Issue 5 VIEW ARTICLE HERE

  3. PARC Periodical | Volume 6, Issue 6 | Photosynthetic Antenna Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center Volume 6, Issue 6 August 20, 2015 PARC Periodical | Volume 6, Issue 6 VIEW ARTICLE HERE

  4. Petroleum supply annual, 1997. Volume 1

    SciTech Connect (OSTI)

    1998-06-01

    The Petroleum Supply Annual (PSA) contains information on the supply and disposition of crude oil and petroleum products. The publication reflects data that were collected from the petroleum industry during 1997 through annual and monthly surveys. The PSA is divided into two volumes. This first volume contains three sections: Summary Statistics, Detailed Statistics, and Refinery Statistics; each with final annual data. The second volume contains final statistics for each month of 1997, and replaces data previously published in the Petroleum Supply Monthly (PSM). The tables in Volumes 1 and 2 are similarly numbered to facilitate comparison between them. 16 figs., 48 tabs.

  5. Petroleum supply annual 1998: Volume 1

    SciTech Connect (OSTI)

    1999-06-01

    The ``Petroleum Supply Annual`` (PSA) contains information on the supply and disposition of crude oil and petroleum products. The publication reflects data that were collected from the petroleum industry during 1998 through annual and monthly surveys. The PSA is divided into two volumes. This first volume contains three sections: Summary Statistics, Detailed Statistics, and Refinery Statistics; each with final annual data. The second volume contains final statistics for each month of 1998, and replaces data previously published in the PSA. The tables in Volumes 1 and 2 are similarly numbered to facilitate comparison between them. 16 figs., 59 tabs.

  6. International Linear Collider Technical Design Report - Volume...

    Office of Scientific and Technical Information (OSTI)

    Linear Collider Technical Design Report - Volume 2: Physics Baer, Howard; Barklow, Tim; Fujii, Keisuke; Gao, Yuanning; Hoang, Andre; Kanemura, Shinya; List, Jenny; Logan, Heather...

  7. Building America Program Evaluation, Harvard University, Volume...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building America Program Evaluation, Harvard University, Volume 1, 2004 Building America ... (ETIP), Kennedy School of Government, Harvard University, Vicki Norberg-Bohm, Principal ...

  8. Building America Program Evaluation, Harvard University, Volume...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building America Program Evaluation, Harvard University, Volume 2, 2004 Building America ... (ETIP), Kennedy School of Government, Harvard University, Vicki Norberg-Bohm, Principal ...

  9. Solar Progammatic Environmental Impact Statement, Volume 1 |...

    Open Energy Info (EERE)

    Progammatic Environmental Impact Statement, Volume 1 Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Solar Progammatic Environmental...

  10. Transmission Commercial Project Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K Commercial Business Process Improvement (CBPI) Customer...

  11. Projects & Facilities - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facilities About Us Projects & Facilities Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Projects & Facilities 100 Area 118-K-1 Burial Ground 200...

  12. 2016 Technology Innovation Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects FY 2016 Technology Innovation Project Briefs Demand Response TIP 292: Advanced Heat Pump Water Heater Research TIP 336: Scaled Deployment and Demonstration of Demand...

  13. Falls Creek Hydroelectric Project

    SciTech Connect (OSTI)

    Gustavus Electric Company; Richard Levitt; DOE Project Officer - Keith Bennett

    2007-06-12

    This project was for planning and construction of a 700kW hydropower project on the Fall River near Gustavus, Alaska.

  14. Sandia National Laboratories: Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Threat and Intelligence Insight Game-changing projects with a high degree of technical risk realized and produced in support of the warfighter Threat and Intelligence...

  15. GTO Project Portfolio

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Office funds 154 research and development projects leveraging nearly $500 million in total combined investment. Each project represents a growing technology sector in conventional hydrothermal,...

  16. Evaluation Project 4492

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Organization area to allow the movement and radio-graphing of component for evaluation to determine the proper Project Execution Plan for dismantlement. Evaluation Project...

  17. All Selected Projects

    Energy Savers [EERE]

    Selected Projects Oct 23, 2009 (rev. Dec. 14, 2010) 99 Projects SMART GRID INVESTMENT GRANTS Type Advanced Metering Infrastructure Customer Systems Electric Systems Distribution...

  18. Campo Net Meter Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Campo Net Meter Project Michael Connolly Miskwish, MA EconomistEngineer Campo Kumeyaay Nation Location map Tribal Energy Planning Current 50 MW project Proposed 160 MW ...

  19. MHK Projects/Clarence Strait Tidal Energy Project | Open Energy...

    Open Energy Info (EERE)

    Project Country Australia Project Resource Click here Current Tidal Project Nearest Body of Water Clarence Strait Coordinates -12.083533792616, 131.04972839355 Project...

  20. MHK Projects/Twelve Mile Point Project | Open Energy Information

    Open Energy Info (EERE)

    Province Louisiana Project Country United States Project Resource Click here Current Tidal Coordinates 29.9177, -89.9307 Project Phase Phase 1 Project Installed Capacity...

  1. NNSA project receives DOE Secretary's Award for Project Management...

    National Nuclear Security Administration (NNSA)

    project receives DOE Secretary's Award for Project Management Improvement | National ... Blog Home NNSA Blog NNSA project receives DOE Secretary's Award for ... NNSA project ...

  2. Projects - Summer 2016 Cyclotron Institute REU Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2016 Student Projects

  3. Environmental Justice Interagency Collaborative Newsletter Volume 1 |

    Office of Environmental Management (EM)

    Department of Energy Justice Interagency Collaborative Newsletter Volume 1 Environmental Justice Interagency Collaborative Newsletter Volume 1 The inaugural edition of the Environmental Justice Interagency Collaborative Newsletter is one of many opportunities the agencies are utilizing to share information and to communicate the various collaborative efforts ongoing throughout the Federal Interagency Working Group on Environmental Justice (EJ IWG). PDF icon Environmental Justice Interagency

  4. Solar Energy Science Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science Projects Curriculum: Solar Power -(thermodynamics, lightelectromagnetic, radiation, energy transformation, conductionconvection, seasons, trigonometry) Grade Level: ...

  5. Fairbanks Geothermal Energy Project

    Broader source: Energy.gov [DOE]

    Fairbanks Geothermal Energy Project presentation at the April 2013 peer review meeting held in Denver, Colorado.

  6. PROJECT MANGEMENT PLAN EXAMPLES Project Execution Example

    Office of Environmental Management (EM)

    Project Execution Example Example 73 6.3 Project Approach The overall schedule strategy for the PFP project includes ongoing minimum safe activities, combined with stabilization of materials followed by materials disposition, and subsequent transition of the PFP complex to a decommissioned state. The PFP material stabilization baseline was developed using a functionally-based work WBS. The WBS defines all activities required to take each material stream from their current location/conditions

  7. Reynolds Creek Hydroelectric Project, Project Status

    Energy Savers [EERE]

    Hydroelectric Project Project Status November 17, 2009 By : Alvin Edenshaw, President Haida Corporation and Haida Energy, Inc. Mike Stimac, P.E. Vice President, HDR Engineering, Inc. Project Manager November 17, 2009 2 Haida Corporation  Located in Hydaburg on Prince of Wales Island in SE Alaska  Hydaburg population = 350 people (called Kaigani Haida)  Hydaburg is largest Haida Village in Alaska  Subsistence and Commercial Fishing Lifestyle  Substantial Timber Holdings 

  8. January 2016 Project Dashboard

    Broader source: Energy.gov [DOE]

    The Office of Project Management Oversight and Assessments (PM) provides a monthly assessment of DOEs portfolio of capital assets projects, which is summarized in the monthly Project Dashboard report. The current portfolio consists of 32 active projects with established scope, schedule, and cost performance baselines. Based on current performance, projects that are expected to meet their performance baseline are assessed as GREEN, projects that are at-risk of breaching their performance baselines are assessed as YELLOW, and projects that are expected to breach their performance baselines are assessed as RED.

  9. March 2016 Project Dashboard

    Broader source: Energy.gov [DOE]

    The Office of Project Management Oversight and Assessments (PM) provides a monthly assessment of DOE’s portfolio of capital assets projects, which is summarized in the monthly Project Dashboard report. The current portfolio consists of 33 active projects with established scope, schedule, and cost performance baselines. Based on current performance, projects that are expected to meet their performance baseline are assessed as GREEN, projects that are at-risk of breaching their performance baselines are assessed as YELLOW, and projects that are expected to breach their performance baselines are assessed as RED.

  10. December 2015 Project Dashboard

    Broader source: Energy.gov [DOE]

    The Office of Project Management Oversight and Assessments (PM) provides a monthly assessment of DOEs portfolio of capital assets projects, which is summarized in the monthly Project Dashboard report. The current portfolio consists of 32 active projects with established scope, schedule, and cost performance baselines. Based on current performance, projects that are expected to meet their performance baseline are assessed as GREEN, projects that are at-risk of breaching their performance baselines are assessed as YELLOW, and projects that are expected to breach their performance baselines are assessed as RED.

  11. Contract/Project Management

    Office of Environmental Management (EM)

    2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - Two projects completed in the 2 nd Qtr FY09. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects

  12. Project Reports for Winnebago Tribe- 2014 Project

    Broader source: Energy.gov [DOE]

    Following through with the Winnebago Tribe's commitment to reduce energy usage and consumption, the Winnebago Tribe Solar Project will focus on renewable energy production and energy cost savings...

  13. ARRA Electrification Projects

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    U.S. Department of Energy funded multiple electrification projects through the American Recovery and Reinvestment Act to accelerate the deployment of electric drive vehicles and charging equipment. These included Clean Cities electric drive projects and transportation electrification projects. Use the interactive map above to learn more about the plan and status of the various projects. The U.S. Department of Energy funded multiple electrification projects through the American Recovery and

  14. From Project Sapphire to Today | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    From Project Sapphire to ... From Project Sapphire to Today Posted: February 7, 2013 - 6:45pm | Y-12 Report | Volume 9, Issue 2 | 2013 At the 2010 Nuclear Security Summit, President Barack Obama set forth a large-scale effort to aggressively secure the world's vulnerable nuclear material. This effort to reduce the threat of nuclear terrorism was reinforced at the 2012 summit with continued support for the National Nuclear Security Administration's Global Threat Reduction Initiative. But nearly

  15. Probabilistic accident consequence uncertainty analysis: Food chain uncertainty assessment. Volume 1: Main report

    SciTech Connect (OSTI)

    Brown, J.; Goossens, L.H.J.; Kraan, B.C.P.

    1997-06-01

    This volume is the first of a two-volume document that summarizes a joint project conducted by the US Nuclear Regulatory Commission and the European Commission to assess uncertainties in the MACCS and COSYMA probabilistic accident consequence codes. These codes were developed primarily for estimating the risks presented by nuclear reactors based on postulated frequencies and magnitudes of potential accidents. This document reports on an ongoing project to assess uncertainty in the MACCS and COSYMA calculations for the offsite consequences of radionuclide releases by hypothetical nuclear power plant accidents. A panel of sixteen experts was formed to compile credible and traceable uncertainty distributions for food chain variables that affect calculations of offsite consequences. The expert judgment elicitation procedure and its outcomes are described in these volumes. Other panels were formed to consider uncertainty in other aspects of the codes. Their results are described in companion reports. Volume 1 contains background information and a complete description of the joint consequence uncertainty study. Volume 2 contains appendices that include (1) a summary of the MACCS and COSYMA consequence codes, (2) the elicitation questionnaires and case structures for both panels, (3) the rationales and results for the panels on soil and plant transfer and animal transfer, (4) short biographies of the experts, and (5) the aggregated results of their responses.

  16. Building America Best Practices Series: Volume 12. Energy Renovations-Insulation: A Guide for Contractors to Share With Homeowners

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Insulation A Guide for Contractors to Share with Homeowners PREPARED BY Pacific Northwest National Laboratory & Oak Ridge National Laboratory May 2012 May 2012 * PNNL-20972 BUILDING AMERICA BEST PRACTICES SERIES VOLUME 17. R BUILDING AMERICA BEST PRACTICES SERIES Energy Renovations Volume 17: Insulation A Guide for Contractors to Share with Homeowners Prepared by Pacific Northwest National Laboratory Michael C. Baechler, Project Manager K. T. Adams, M. G. Hefty, and T. L. Gilbride and Oak

  17. Fundamental Kinetics Database Utilizing Shock Tube Measurements (Volumes 1, 2, 3, 4, and Volume 6)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Davidson, D. F.; Hanson, R. K

    The data from shock tube experiments generally takes three forms: ignition delay times, species concentration time-histories and reaction rate measurements. Volume 1 focuses on ignition delay time data measured and published by the Shock Tube Group in the Mechanical Engineering Department of Stanford University. The cut-off date for inclusion into this volume was January 2005. Volume 2 focuses on species concentration time-histories and was cut off December 2005. The two volumes are in PDF format and are accompanied by a zipped file of supporting data. Volume 3 was issued in 2009. Volume 4, Ignition delay times measurements came out in May, 2014, along with Reaction Rates Measurements, Vol 6. Volume 5 is not available at this time.

  18. Contract/Project Management

    Office of Environmental Management (EM)

    8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2008 Target FY 2008 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 75% 76% This is a 3-year rolling average Data includes FY06 to FY08. (37/48) 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete

  19. Contract/Project Management

    Office of Environmental Management (EM)

    1 st Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - No 1 st Qtr FY09 completions. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of

  20. Contract/Project Management

    Office of Environmental Management (EM)

    3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 72% This is a 3-year rolling average (FY07 to FY09). No 3 rd qtr FY09 completions. 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of

  1. Contract/Project Management

    Office of Environmental Management (EM)

    4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 73% This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125%

  2. Contract/Project Management

    Office of Environmental Management (EM)

    1 st Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target 1st Qtr FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 73% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to

  3. Contract/Project Management

    Office of Environmental Management (EM)

    Second Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 73% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10).

  4. Contract/Project Management

    Office of Environmental Management (EM)

    Third Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 71% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10).

  5. New hydrocracker complex: The master plan study report. Executive summary. Volume 1. Export trade information

    SciTech Connect (OSTI)

    1995-06-16

    The study, conducted by ABB Lummus Crest, was funded by the U.S. Trade and Development Agency. The purpose of the Master Plan is to aid in the implementation of the new hydrocracker complex at the Kirishi Refinery in Russia. The report contains financial information, including the project costs and the development of a financing plan. Also covered in the study is a marketing plan for both the domestic and export scenarios for products produced by the complex. This is Volume 1 of a three volume report and it contains the Executive Summary.

  6. Greater-than-Class C low-level radioactive waste characterization: Estimated volumes, radionuclide activities, and other characteristics

    SciTech Connect (OSTI)

    Hulse, R.A.

    1991-08-01

    Planning for storage or disposal of greater-than-Class C low-level radioactive waste (GTCC LLW) requires characterization of that waste to estimate volumes, radionuclide activities, and waste forms. Data from existing literature, disposal records, and original research were used to estimate the characteristics and project volumes and radionuclide activities to the year 2035. GTCC LLW is categorized as: nuclear utilities waste, sealed sources waste, DOE-held potential GTCC LLW; and, other generator waste. It has been determined that the largest volume of those wastes, approximately 57%, is generated by nuclear power plants. The Other Generator waste category contributes approximately 10% of the total GTCC LLW volume projected to the year 2035. Waste held by the Department of Energy, which is potential GTCC LLW, accounts for nearly 33% of all waste projected to the year 2035; however, no disposal determination has been made for that waste. Sealed sources are less than 0.2% of the total projected volume of GTCC LLW.

  7. Petroleum supply annual 1995: Volume 2

    SciTech Connect (OSTI)

    1996-06-01

    The Petroleum Supply Annual (PSA) contains information on the supply and disposition of crude oil and petroleum products. The publication reflects data that were collected from the petroleum industry during 1995 through monthly surveys. The PSA is divided into two volumes. This first volume contains three sections: Summary Statistics, Detailed Statistics, and selected Refinery Statistics each with final annual data. The second volume contains final statistics for each month of 1995, and replaces data previously published in the Petroleum Supply Monthly (PSM). The tables in Volumes 1 and 2 are similarly numbered to facilitate comparison between them. Explanatory Notes, located at the end of this publication, present information describing data collection, sources, estimation methodology, data quality control procedures, modifications to reporting requirements and interpretation of tables. Industry terminology and product definitions are listed alphabetically in the Glossary.

  8. Petroleum supply annual 1994, Volume 2

    SciTech Connect (OSTI)

    1995-06-01

    The Petroleum Supply Annual (PSA) contains information on the supply and disposition of crude oil and petroleum products. The publication reflects data that were collected from the petroleum industry during 1994 through annual and monthly surveys. The PSA is divided into two volumes. This first volume contains four sections: Summary Statistics, Detailed Statistics, Refinery Capacity, and Oxygenate Capacity each with final annual data. The second volume contains final statistics for each month of 1994, and replaces data previously published in the Petroleum Supply Monthly (PSM). The tables in Volumes 1 and 2 are similarly numbered to facilitate comparison between them. Explanatory Notes, located at the end of this publication, present information describing data collection, sources, estimation methodology, data quality control procedures, modifications to reporting requirements and interpretation of tables. Industry terminology and product definitions are listed alphabetically in the Glossary.

  9. Petroleum supply annual 1996: Volume 2

    SciTech Connect (OSTI)

    1997-06-01

    The Petroleum Supply Annual (PSA) contains information on the supply and disposition of crude oil and petroleum products. The publication reflects data that were collected from the petroleum industry during 1996 through monthly surveys. The PSA is divided into two volumes. The first volume contains three sections: Summary Statistics, Detailed Statistics, and Refinery Capacity; each with final annual data. The second volume contains final statistics for each month of 1996, and replaces data previously published in the Petroleum Supply Monthly (PSM). The tables in Volumes 1 and 2 are similarly numbered to facilitate comparison between them. Explanatory Notes, located at the end of this publication, present information describing data collection, sources, estimation methodology, data quality control procedures, modifications to reporting requirements and interpretation of tables. Industry terminology and product definitions are listed alphabetically in the Glossary. 35 tabs.

  10. Petroleum supply annual 1998: Volume 2

    SciTech Connect (OSTI)

    1999-06-01

    The Petroleum Supply Annual (PSA) contains information on the supply and disposition of crude oil and petroleum products. The publication reflects data that were collected from the petroleum industry during 1998 through monthly surveys. The PSA is divided into two volumes. The first volume contains three sections: Summary Statistics, Detailed Statistics, and Refinery Statistics; each with final annual data. This second volume contains final statistics for each month of 1998, and replaces data previously published in the Petroleum Supply Monthly (PSM). The tables in Volumes 1 and 2 are similarly numbered to facilitate comparison between them. Explanatory Notes, located at the end of this publication, present information describing data collection, sources, estimation methodology, data quality control procedures, modifications to reporting requirements and interpretation of tables. Industry terminology and product definitions are listed alphabetically in the Glossary. 35 tabs.

  11. Site Environmental Report for 1999 - Volume II

    SciTech Connect (OSTI)

    Ruggieri, M.

    2000-08-01

    Each year, Ernest Orlando Lawrence Berkeley National Laboratory prepares an integrated report on its environmental programs to satisfy the requirements of United States Department of Energy Order 231.1. The Site Environmental Report for 1999 is intended to summarize Berkeley Lab's compliance with environmental standards and requirements, characterize environmental management efforts through surveillance and monitoring activities, and highlight significant programs and efforts for calendar year 1999. The report is separated into two volumes. Volume I contains a general overview of the Laboratory, the status of environmental programs, and summary results from surveillance and monitoring activities. Each chapter in Volume I begins with an outline of the sections that follow, including any tables or figures found in the chapter. Readers should use section numbers (e.g., {section}1.5) as navigational tools to find topics of interest in either the printed or the electronic version of the report. Volume II contains the individual data results from monitoring programs.

  12. Petroleum supply annual, 1997. Volume 2

    SciTech Connect (OSTI)

    1998-06-01

    The Petroleum Supply Annual (PSA) contains information on the supply and disposition of crude oil and petroleum products. The publication reflects data that were collected from the petroleum industry during 1997 through monthly surveys. The PSA is divided into two volumes. The first volume contains three sections: Summary Statistics, Detailed Statistics, and Refinery Statistics; each with final annual data. The second volume contains final statistics for each month of 1997, and replaces data previously published in the Petroleum Supply Monthly (PSM). The tables in Volumes 1 and 2 are similarly numbered to facilitate comparison between them. Explanatory Notes, located at the end of this publication, present information describing data collection, sources, estimation methodology, data quality control procedures, modifications to reporting requirements and interpretation of tables. Industry terminology and product definitions are listed alphabetically in the Glossary. 35 tabs.

  13. U.S. Prices, Sales Volumes & Stocks

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Prices, Sales Volumes & Stocks by State Area: U.S. East Coast (PADD 1) New England (PADD 1A) Connecticut Maine Massachusetts New Hampshire Rhode Island Vermont Central Atlantic...

  14. Petroleum Supply Annual 1998, Volume 2

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    8, Volume 2 Entire . The entire report as a single file. PDF 3.8MB . . Front Matter . Cover Page, Contacts, Preface, and Table of Contents Page PDF . . Monthly Statistics Tables ....

  15. Petroleum Supply Annual 1997, Volume 1

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    7, Volume 1 Entire . The entire report as a single file. PDF 1.0MB . . Front Matter . Cover Page, Contacts, Preface, and Table of Contents Page PDF . . Summary Statistics . Summary...

  16. Volume International: Proposed Penalty (2014-CE-32014)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Volume International Corporation failed to certify a variety of ceiling fans as compliant with the applicable energy conservation standards.

  17. Method of measuring a liquid pool volume

    DOE Patents [OSTI]

    Garcia, Gabe V. (Las Cruces, NM); Carlson, Nancy M. (Idaho Falls, ID); Donaldson, Alan D. (Idaho Falls, ID)

    1991-01-01

    A method of measuring a molten metal liquid pool volume and in particular molten titanium liquid pools, including the steps of (a) generating an ultrasonic wave at the surface of the molten metal liquid pool, (b) shining a light on the surface of a molten metal liquid pool, (c) detecting a change in the frequency of light, (d) detecting an ultrasonic wave echo at the surface of the molten metal liquid pool, and (e) computing the volume of the molten metal liquid.

  18. Photoexcitation of a Volume Plasmon in Buckyballs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Photoexcitation of a Volume Plasmon in Buckyballs Photoexcitation of a Volume Plasmon in Buckyballs Print Wednesday, 31 August 2005 00:00 For molecules made from a single element, buckyballs (carbon-60) are very large. They mark the transition from atoms to solids. In atoms and small molecules, the behavior of electrons is accounted individually; in bulk materials, a sea of innumerable electrons can behave en masse, yielding a very different description of electronic structure. Buckyballs perch

  19. ETTP Volume I - final.PDF

    Office of Environmental Management (EM)

    Inspection of Environment, Safety, and Health Management at the Oak Ridge Operations Office East Tennessee Technology Park and Officeof Independent Oversight and PerformanceAssurance Officeof theSecretary of Energy May 2003 ISM Volume I INDEPENDENT OVERSIGHT INSPECTION OF ENVIRONMENT, SAFETY, AND HEALTH MANAGEMENT AT THE OAK RIDGE OPERATIONS OFFICE AND EAST TENNESSEE TECHNOLOGY PARK Volume I May 2003 i INDEPENDENT OVERSIGHT INSPECTION OF ENVIRONMENT, SAFETY, AND HEALTH MANAGEMENT AT THE OAK

  20. Sample Project Execution Plan

    Broader source: Energy.gov [DOE]

    The project execution plan (PEP) is the governing document that establishes the means to execute, monitor, and control projects.  The plan serves as the main communication vehicle to ensure that...

  1. Haida Corporation- 2010 Project

    Broader source: Energy.gov [DOE]

    The Reynolds Creek Hydroelectric Project ("Reynolds Creek" or the "Project") is a 5 MW hydroelectric resource to be constructed on Prince of Wales Island, Alaska, approximately 10 miles east of Hydaburg.

  2. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    within 110% of CD-2 TPC by FY11. 80% 72% This is a 3-year rolling average (FY07 to FY09). ... projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup ...

  3. Information Technology Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-03

    The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1 approved 1-16-2013.

  4. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 Actual FY 2011 Pre- & Post-CAP Actual Comment 1a. Capital Asset Line Item Projects: ...

  5. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 Actual & Forecast FY 2011 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: ...

  6. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA...

  7. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: ...

  8. Improving Project Management

    Office of Environmental Management (EM)

    Improving Project Management Report of the Contract and Project Management Working Group November 2014 1 TABLE OF CONTENTS 1. Foreword ........................................................................................................................................................................... 2 2. Executive Summary ...................................................................................................................................................... 3 2.1 Summary of

  9. Acquisition and Project Management

    National Nuclear Security Administration (NNSA)

    4%2A en Acquisition and Project Management Office volunteers get up-close look at Office of Secure Transportation exercise http:nnsa.energy.govblogacquisition-and-project-mana...

  10. GHPsRUS Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Battocletti, Liz

    The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

  11. GHPsRUS Project

    SciTech Connect (OSTI)

    Battocletti, Liz

    2013-07-09

    The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

  12. WIPP Projects Interative Map

    Broader source: Energy.gov [DOE]

    View WIPP Projects in a larger map. To report corrections, please email WeatherizationInnovation@ee.doe.gov.

  13. Mentors and Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mentors, Projects Mentors and Projects Bringing together top space science students with internationally recognized researchers at Los Alamos in an educational, collaborative atmosphere Contacts Director Misa Cowee Email Administrative Assistant Mary Wubbena Email Request more information Email Students work closely with their mentors, who are Laboratory scientists, on challenging research projects in the Space Weather Summer School. Projects are related to current research topics in space

  14. Step 2: Project Options

    Energy Savers [EERE]

    2: Project Options 2 2 Design 1 Potential 3 Refinement 4 Implementation 2 Options 5 Operations & Maintenance 1/28/2016 2 Presentation Agenda * Step 2: Project Options * Project members and roles * Activity * Project ownership options - Interconnection, net metering, permitting, and considerations * Tools * Case in Point 3 Potential Options Refinement Implementation Operations & Maintenance 4 Step 2: Roles, Business Structures, & Regulatory Considerations Purpose: Determine ownership

  15. Red Lake Weatherization Project

    Energy Savers [EERE]

    REVIEW RED LAKE WEATHERIZATION PROJECT BERT VAN WERT ENERGY ACTIVITIES COORDINATOR Project Overview To develop the capacity to conduct energy audits Implement energy efficiency measures into Tribal homes Develop a Tribally administered Energy Efficiency Program and business PROJECT LOCATION Our project is located at Red Lake Housing Authority Red Lake Band of Chippewa Indians Red Lake , MN Red Lake Band of Chippewas Area overview Reservation (Diminished Lands) and Surroundings Red Lake Band of

  16. Step 4: Project Implementation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: Project Implementation Project Implementation 2 1 Potential 3 Refinement 5 Operations & Maintenance 2 Options 4 Implementation Step 4: Implementation 3 1 Potential 3 Refinement 5 Operations & Maintenance 2 Options 4 Implementation Step 4: Implementation 1. Pre-construction - Project kickoff - Design and construction documents, plans/schedules, submittals 2. Construction of project - Contract oversight/quality control - Change control 3. Commissioning - Testing and verification -

  17. Request for Proposals for New or Upgraded Transmission Line Projects Under

    Energy Savers [EERE]

    Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012 | Department of Energy Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012 Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012 PDF icon FRN Request

  18. Project Reports for Pawnee Nation- 2006 Project

    Broader source: Energy.gov [DOE]

    The primary goal of this project is to move the energy vision of the Pawnee Nation forward by conducting specific data collection and analysis tasks to assess the viable options available to Pawnee to meet future energy needs sustainable.

  19. Project Reports for Hualapai Tribe- 2010 Project

    Broader source: Energy.gov [DOE]

    The project will build on the potential for renewable energy development on the Hualapai Reservation that was identified during the Phase l renewable energy resource assessment conducted by the Hualapai Tribe since 2005.

  20. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    SciTech Connect (OSTI)

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  1. Nuclear regulatory legislation, 104th Congress. Volume 2, No. 4

    SciTech Connect (OSTI)

    1997-12-01

    This document is the second of two volumes compiling statutes and material pertaining to nuclear regulatory legislation through the 104th Congress, 2nd Session. It is intended for use as a U.S. Nuclear Regulatory Commission (NRC) internal resource document. Legislative information reproduced in this document includes portions of the Paperwork Reduction Act, various acts pertaining to low-level radioactive waste, the Clean Air Act, the Federal Water Pollution Control Act, the National Environmental Policy Act, the Hazardous Materials Transportation Act, the West Valley Demonstration Project Act, Nuclear Non-Proliferation and Export Licensing Statutes, and selected treaties, agreements, and executive orders. Other information provided pertains to Commissioner tenure, NRC appropriations, the Chief Financial Officers Act, information technology management reform, and Federal civil penalties.

  2. MHK Projects/Tensas | Open Energy Information

    Open Energy Info (EERE)

    ","visitedicon":"" Project Profile Project Start Date 112009 Project City Butte la Rose, LA Project StateProvince Louisiana Project Country United States Project Resource...

  3. Justice and the Human Genome Project

    SciTech Connect (OSTI)

    Murphy, T.F.; Lappe, M.

    1992-12-31

    Most of the essays gathered in this volume were first presented at a conference, Justice and the Human Genome, in Chicago in early November, 1991. The goal of the, conference was to consider questions of justice as they are and will be raised by the Human Genome Project. To achieve its goal of identifying and elucidating the challenges of justice inherent in genomic research and its social applications the conference drew together in one forum members from academia, medicine, and industry with interests divergent as rate-setting for insurance, the care of newborns, and the history of ethics. The essays in this volume address a number of theoretical and practical concerns relative to the meaning of genomic research.

  4. Justice and the Human Genome Project

    SciTech Connect (OSTI)

    Murphy, T.F.; Lappe, M.

    1992-01-01

    Most of the essays gathered in this volume were first presented at a conference, Justice and the Human Genome, in Chicago in early November, 1991. The goal of the, conference was to consider questions of justice as they are and will be raised by the Human Genome Project. To achieve its goal of identifying and elucidating the challenges of justice inherent in genomic research and its social applications the conference drew together in one forum members from academia, medicine, and industry with interests divergent as rate-setting for insurance, the care of newborns, and the history of ethics. The essays in this volume address a number of theoretical and practical concerns relative to the meaning of genomic research.

  5. Desert Peak EGS Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Desert Peak EGS Project DOE Award: DE-FC6-02ID14406 Ethan Chabora GeothermEx, a Schlumberger Company Ezra Zemach Ormat Nevada Inc. Project Officer: Bill Vandermeer Total Project Funding: $7.6M April 22nd, 2013 This presentation does not contain any proprietary confidential, or otherwise restricted information. Insert photo of your choice 2 | US DOE Geothermal Program eere.energy.gov - Timeline * Project start date: September 2002 * Project end date: Q3 2013 * Percentage complete: 90% - Budget *

  6. Contract/Project Management

    Office of Environmental Management (EM)

    3 First Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2013 Target FY 2013 Final FY 2013 Pre- & Post-CAP Final Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 83% Construction 86% Cleanup 80% 70% Pre-CAP 84% Post-CAP This is based on a 3- year rolling average (FY11 to FY13). TPC is Total Project Cost.

  7. Contract/Project Management

    Office of Environmental Management (EM)

    Fourth Quarter Overall Root Cause Analysis (RCA)/Corrective Action Plan (CAP) Performance Metrics 1 Contract/Project Management Performance Metric FY 2013 Target FY 2013 Actual FY 2013 Pre- & Post-CAP* Actual Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90% 83% Construction 84% Cleanup 82% 70% Pre-CAP 84% Post-CAP Based on 3-year rolling period (FY11 to FY13) of 93 projects. TPC is Total Project Cost.

  8. Contract/Project Management

    Office of Environmental Management (EM)

    Fourth Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 69% Line Item 67% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY08 to FY10). TPC is Total

  9. Contract/Project Management

    Office of Environmental Management (EM)

    First Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual & Forecast FY 2011 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 79% Line Item 71% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total

  10. Contract/Project Management

    Office of Environmental Management (EM)

    Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC

  11. Contract/Project Management

    Office of Environmental Management (EM)

    Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is

  12. Contract/Project Management

    Office of Environmental Management (EM)

    Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual FY 2011 Pre- & Post-CAP Actual Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 77% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is

  13. Contract/Project Management

    Office of Environmental Management (EM)

    First Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 84% Construction 83% Cleanup 85% 77% Pre-CAP 86% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost.

  14. Contract/Project Management

    Office of Environmental Management (EM)

    Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 88% Construction 87% Cleanup 89% 77% Pre-CAP 92% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost.

  15. Contract/Project Management

    Office of Environmental Management (EM)

    Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 87% Construction 87% Cleanup 87% 77% Pre-CAP 90% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost.

  16. Contract/Project Management

    Office of Environmental Management (EM)

    Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Final FY 2012 Pre- & Post-CAP Final Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 86% Construction 87% Cleanup 84% 77% Pre-CAP 89% Post-CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost.

  17. Volume II Volume II U.S. DEPARTMENT OF ENERGY NEVADA OPERATIONS OFFICE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    20 DOE/NV/l 0630-20 Volume II Volume II U.S. DEPARTMENT OF ENERGY NEVADA OPERATIONS OFFICE ANNUAL SITE ENVIRONMENTAL REPORT - 1990 Volume II - Appendices Editors: Elizabeth M. McDowell and Stuart C. Blakk September 1991 Work Performed Under Contract No. DE-AC08-89NV10630 prepared by: Reynolds Electrical & Engineering Co., Inc. Post Office Box 98521 Las Vegas, Nevada 89193-8521 DOE/NV/l 0630-20 Volume II U.S. DEPARTMENT OF ENERGY NEVADA OPERATIONS OFFICE ANNUAL SITE ENVIRONMENTAL REPORT -

  18. Coastal Ohio Wind Project

    SciTech Connect (OSTI)

    Gorsevski, Peter; Afjeh, Abdollah; Jamali, Mohsin; Bingman, Verner

    2014-04-04

    The Coastal Ohio Wind Project intends to address problems that impede deployment of wind turbines in the coastal and offshore regions of Northern Ohio. The project evaluates different wind turbine designs and the potential impact of offshore turbines on migratory and resident birds by developing multidisciplinary research, which involves wildlife biology, electrical and mechanical engineering, and geospatial science. Firstly, the project conducts cost and performance studies of two- and three-blade wind turbines using a turbine design suited for the Great Lakes. The numerical studies comprised an analysis and evaluation of the annual energy production of two- and three-blade wind turbines to determine the levelized cost of energy. This task also involved wind tunnel studies of model wind turbines to quantify the wake flow field of upwind and downwind wind turbine-tower arrangements. The experimental work included a study of a scaled model of an offshore wind turbine platform in a water tunnel. The levelized cost of energy work consisted of the development and application of a cost model to predict the cost of energy produced by a wind turbine system placed offshore. The analysis found that a floating two-blade wind turbine presents the most cost effective alternative for the Great Lakes. The load effects studies showed that the two-blade wind turbine model experiences less torque under all IEC Standard design load cases considered. Other load effects did not show this trend and depending on the design load cases, the two-bladed wind turbine showed higher or lower load effects. The experimental studies of the wake were conducted using smoke flow visualization and hot wire anemometry. Flow visualization studies showed that in the downwind turbine configuration the wake flow was insensitive to the presence of the blade and was very similar to that of the tower alone. On the other hand, in the upwind turbine configuration, increasing the rotor blade angle of attack reduced the wake size and enhanced the vortices in the flow downstream of the turbine-tower compared with the tower alone case. Mean and rms velocity distributions from hot wire anemometer data confirmed that in a downwind configuration, the wake of the tower dominates the flow, thus the flow fields of a tower alone and tower-turbine combinations are nearly the same. For the upwind configuration, the mean velocity shows a narrowing of the wake compared with the tower alone case. The downwind configuration wake persisted longer than that of an upwind configuration; however, it was not possible to quantify this difference because of the size limitation of the wind tunnel downstream of the test section. The water tunnel studies demonstrated that the scale model studies could be used to adequately produce accurate motions to model the motions of a wind turbine platform subject to large waves. It was found that the important factors that affect the platform is whether the platform is submerged or surface piercing. In the former, the loads on the platform will be relatively reduced whereas in the latter case, the structure pierces the wave free surface and gains stiffness and stability. The other important element that affects the movement of the platform is depth of the sea in which the wind turbine will be installed. Furthermore, the wildlife biology component evaluated migratory patterns by different monitoring systems consisting of marine radar, thermal IR camera and acoustic recorders. The types of radar used in the project are weather surveillance radar and marine radar. The weather surveillance radar (1988 Doppler), also known as Next Generation Radar (NEXRAD), provides a network of weather stations in the US. Data generated from this network were used to understand general migratory patterns, migratory stopover habitats, and other patterns caused by the effects of weather conditions. At a local scale our marine radar was used to complement the datasets from NEXRAD and to collect additional monitoring parameters such as passage rates, flight paths, flight directions, and flight altitudes of nocturnal migrating species. Our work focused on the design and development of custom built marine radar that used t-bar and parabolic dish antennas. The marine radar used in the project was Furuno (XANK250) which was coupled with a XIR3000B digitizing card from Russell Technologies for collection of the radar data. The radar data was processed by open source radR processing software using different computational techniques and methods. Additional data from thermal IR imaging cameras were collected to detect heat emitted from objects and provide information on movements of birds and bats, data which we used for different animal flight behavior analysis. Lastly, the data from the acoustic recorders were used to provide the number of bird calls for assessing patterns and peak passage rates during migration. The development of the geospatial database included collection of different data sources that are used to support offshore wind turbine development. Many different data sets were collected and organized using initial version of web-based repository software tools that can accommodate distribution of rectified pertinent data sets such as the lake depth, lake bottom engineering parameters, extent of ice, navigation pathways, wind speed, important bird habitats, fish efforts and other layers that are relevant for supporting robust offshore wind turbine developments. Additional geospatial products developed during the project included few different prototypes for offshore wind farm suitability which can involve different stakeholders and participants for solving complex planning problems and building consensus. Some of the prototypes include spatial decision support system (SDSS) for collaborative decision making, a web-based Participatory Geographic Information System (PGIS) framework for evaluating importance of different decision alternatives using different evaluation criteria, and an Android application for collection of field data using mobile and tablet devices . In summary, the simulations of two- and three-blade wind turbines suggested that two-bladed machines could produce comparable annual energy as the three-blade wind turbines but have a lighter tower top weight, which leads to lower cost of energy. In addition, the two-blade rotor configuration potentially costs 20% less than a three blade configuration that produces the same power at the same site. The cost model analysis predicted a potential cost savings of approximately 15% for offshore two-blade wind turbines. The foundation design for a wind turbine in Lake Erie is likely to be driven by ice loads based on the currently available ice data and ice mechanics models. Hence, for Lake Eire, the cost savings will be somewhat smaller than the other lakes in the Great Lakes. Considering the size of cranes and vessels currently available in the Great Lakes, the cost optimal wind turbine size should be 3 MW, not larger. The surveillance data from different monitoring systems suggested that bird and bat passage rates per hour were comparable during heavy migrations in both spring and fall seasons while passage rates were significantly correlated to wind directions and wind speeds. The altitude of migration was higher during heavy migrations and higher over water relative to over land. Notable portions of migration on some spring nights occurred parallel the shoreline, often moving perpendicular to southern winds. The birds approaching the Western basin have a higher propensity to cross than birds approaching the Central basin of Lake Erie and as such offshore turbine development might be a better option further east towards Cleveland than in the Western basin. The high stopover density was more strongly associated with migration volume the following night rather than the preceding night. The processed mean scalar wind speeds with temporal resolutions as fine as 10-minute intervals near turbine height showed that August is the month with the weakest winds while December is the month, which typically has the strongest winds. The ice data suggests that shallow western basin of Lake Erie has higher ice cover duration many times exceeding 90 days during some winters.

  19. Volume II, Environment, Safety, and Health Special Review of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Volume II, Environment, Safety, and Health Special Review of Work Practices for Nanoscale Material Activities at Department of Energy Laboratories, August 2008 Volume II, ...

  20. Promising Technology: Variable-Air-Volume Ventilation System

    Broader source: Energy.gov [DOE]

    Variable-air-volume (VAV) ventilation saves energy compared to a constant-air-volume (CAV) ventilation system, mainly by reducing energy consumption associated with fans.

  1. State Energy-Efficient Appliance Rebate Program: Volume 1 - Program...

    Energy Savers [EERE]

    State Energy-Efficient Appliance Rebate Program: Volume 1 - Program Design Lessons Learned State Energy-Efficient Appliance Rebate Program: Volume 1 - Program Design Lessons...

  2. Produced water volumes and management practices in the United...

    Office of Scientific and Technical Information (OSTI)

    Produced water volumes and management practices in the United States. Citation Details In-Document Search Title: Produced water volumes and management practices in the United ...

  3. Building America Best Practices Series: Volume 12. EnergyRenovations...

    Energy Savers [EERE]

    Building America Best Practices Series: Volume 12. Energy Renovations-Insulation: A Guide for Contractors to Share With Homeowners Building America Best Practices Series: Volume...

  4. PARC Periodical | Volume 7, Issue 3 | Photosynthetic Antenna Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center PARC Periodical | Volume 7, Issue 3 February 16, 2016 PARC Periodical | Volume 7, Issue 3 VIEW ARTICLE HERE News/Media PARC Periodical

  5. South Central Region Natural Gas Underground Storage Volume ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    South Central Region Natural Gas Underground Storage Volume (Million Cubic Feet) South Central Region Natural Gas Underground Storage Volume (Million Cubic Feet) Year Jan Feb Mar...

  6. EA-1645: Sage Electrochromics SageGlass High Volume Manufacturing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    45: Sage Electrochromics SageGlass High Volume Manufacturing Facility in Fairbault, MN EA-1645: Sage Electrochromics SageGlass High Volume Manufacturing Facility in Fairbault, MN...

  7. Ablation Casting Evaluation for High Volume Structural Castings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ablation Casting Evaluation for High Volume Structural Castings Ablation Casting Evaluation for High Volume Structural Castings 2012 DOE Hydrogen and Fuel Cells Program and Vehicle...

  8. Bioenergy `96: Partnerships to develop and apply biomass technologies. Volume I and II

    SciTech Connect (OSTI)

    1996-12-31

    The conference proceedings consist of two volumes of papers detailing numerous issues related to biomass energy production and use. An author and keyword index are provided in the proceedings. A total of 143 papers were selected for the database. Papers were selected from the following areas from Volume 1: feedstock production, harvest, storage, and delivery; the DOE biomass power program; technical, economic, and policy barriers and incentives; new developments in biomass combustion; advancements in biomass gasification; liquid fuels production and use; and case studies of bioenergy projects. From Volume 2, subtopics selected included: bioenergy systems for distributed generation; assessment and use of biomass wastes; non-technical barriers to bioenergy implementation; improving commercial viability through integrated systems; and anaerobic digestion.

  9. Recent regulatory experience of low-Btu coal gasification. Volume III. Supporting case studies

    SciTech Connect (OSTI)

    Ackerman, E.; Hart, D.; Lethi, M.; Park, W.; Rifkin, S.

    1980-02-01

    The MITRE Corporation conducted a five-month study for the Office of Resource Applications in the Department of Energy on the regulatory requirements of low-Btu coal gasification. During this study, MITRE interviewed representatives of five current low-Btu coal gasification projects and regulatory agencies in five states. From these interviews, MITRE has sought the experience of current low-Btu coal gasification users in order to recommend actions to improve the regulatory process. This report is the third of three volumes. It contains the results of interviews conducted for each of the case studies. Volume 1 of the report contains the analysis of the case studies and recommendations to potential industrial users of low-Btu coal gasification. Volume 2 contains recommendations to regulatory agencies.

  10. The Department of Energy`s Rocky Flats Plant: A guide to record series useful for health-related research. Volume I, introduction

    SciTech Connect (OSTI)

    1995-08-01

    This guide consists of seven volumes which describe records useful for conducting health-related research at the DOE`s Rocky Flats Plant. Volume I is an introduction, and the remaining six volumes are arranged by the following categories: administrative and general, facilities and equipment, production and materials handling, waste management, workplace and environmental monitoring, and employee occupational exposure and health. Volume I briefly describes the Epidemiologic Records Project and provides information on the methodology used to inventory and describe the records series contained in subsequent volumes. Volume II describes records concerning administrative functions and general information. Volume III describes records series relating to the construction and routine maintenance of plant buildings and the purchase and installation of equipment. Volume IV describes records pertaining to the inventory and production of nuclear materials and weapon components. Records series include materials inventories, manufacturing specifications, engineering orders, transfer and shipment records, and War Reserve Bomb Books. Volume V describes records series pertaining to the storage, handling, treatment, and disposal of radioactive, chemical, or mixed materials produced or used at Rocky Flats. Volume VI describes records series pertaining to monitoring of the workplace and of the environment outside of buildings onsite and offsite. Volume VII describes records series pertaining to the health and occupational exposures of employees and visitors.

  11. EM Capital Asset Project List

    Broader source: Energy.gov [DOE]

    Read the EM Capital Asset Project List, which includes the project's name, site, current critical decision and current total project cost.

  12. Principal Associate Director - Capital Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Principal Associate Director - Capital Projects As Principal Associate Director for Capital Projects (interim), Larry Simmons is responsible for institutional large-project...

  13. Site Environmental Report for 2002, Volume 2

    SciTech Connect (OSTI)

    Pauer, Ron

    2003-07-01

    Each year, Ernest Orlando Lawrence Berkeley National Laboratory prepares an integrated report on its environmental programs to satisfy the requirements of United States Department of Energy Order 231.1. The ''Site Environmental Report for 2002'' summarizes Berkeley Lab's compliance with environmental standards and requirements, characterizes environmental management efforts through surveillance and monitoring activities, and highlights significant programs and efforts for calendar year 2002. Throughout this report, Ernest Orlando Lawrence Berkeley National Laboratory is referred to as ''Berkeley Lab,'' ''the Laboratory,'' ''Lawrence Berkeley National Laboratory,'' and ''LBNL.'' The report is separated into two volumes. Volume I contains a general overview of the Laboratory, the status of environmental programs, and summarized results from surveillance and monitoring activities. Volume II contains individual data results from the monitoring programs. This year, the ''Site Environmental Report'' was distributed on a CD in PDF format that includes Volume I, Volume II, and related documents. The report is also available on the Web at http://www.lbl.gov/ehs/esg/. The report follows the Laboratory's policy of using the International System of Units (SI), also known as the metric system of measurements. Whenever possible, results are additionally reported using the more conventional (non-SI) system of measurements because this system is referenced by some current regulatory standards and is more familiar to some readers. The tables included at the end of the Glossary are intended to help readers understand the various prefixes used with SI units of measurement and convert these units from one system to the other.

  14. Site Environmental Report for 2002, Volume 1

    SciTech Connect (OSTI)

    Pauer, Ron

    2003-07-01

    Each year, Ernest Orlando Lawrence Berkeley National Laboratory prepares an integrated report on its environmental programs to satisfy the requirements of United States Department of Energy Order 231.1. The ''Site Environmental Report for 2002'' summarizes Berkeley Lab's compliance with environmental standards and requirements, characterizes environmental management efforts through surveillance and monitoring activities, and highlights significant programs and efforts for calendar year 2002. Throughout this report, Ernest Orlando Lawrence Berkeley National Laboratory is referred to as ''Berkeley Lab,'' ''the Laboratory,'' ''Lawrence Berkeley National Laboratory,'' and ''LBNL.'' The report is separated into two volumes. Volume I contains a general overview of the Laboratory, the status of environmental programs, and summarized results from surveillance and monitoring activities. Volume II contains individual data results from the monitoring programs. This year, the ''Site Environmental Report'' was distributed on a CD in PDF format that includes Volume I, Volume II, and related documents. The report is also available on the Web at http://www.lbl.gov/ehs/esg/. The report follows the Laboratory's policy of using the International System of Units (SI), also known as the metric system of measurements. Whenever possible, results are additionally reported using the more conventional (non-SI) system of measurements because this system is referenced by some current regulatory standards and is more familiar to some readers. The tables included at the end of the Glossary are intended to help readers understand the various prefixes used with SI units of measurement and convert these units from one system to the other.

  15. MHK Projects/UEK Yukon River Project | Open Energy Information

    Open Energy Info (EERE)

    StateProvince Alaska Project Country United States Project Resource Click here Current Tidal Coordinates 64.7881, -141.2 Project Phase Phase 1 Project Details UEK is has...

  16. Volume I Final Environmental Impact Statement

    Office of Environmental Management (EM)

    ... Project-related equipment and machinery would be cleaned using compressed air or water to ... noise elevates ambient sound levels, signals that might otherwise have been detected ...

  17. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    SEEMAN, S.E.

    2000-04-01

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  18. Time varying, multivariate volume data reduction

    SciTech Connect (OSTI)

    Ahrens, James P; Fout, Nathaniel; Ma, Kwan - Liu

    2010-01-01

    Large-scale supercomputing is revolutionizing the way science is conducted. A growing challenge, however, is understanding the massive quantities of data produced by large-scale simulations. The data, typically time-varying, multivariate, and volumetric, can occupy from hundreds of gigabytes to several terabytes of storage space. Transferring and processing volume data of such sizes is prohibitively expensive and resource intensive. Although it may not be possible to entirely alleviate these problems, data compression should be considered as part of a viable solution, especially when the primary means of data analysis is volume rendering. In this paper we present our study of multivariate compression, which exploits correlations among related variables, for volume rendering. Two configurations for multidimensional compression based on vector quantization are examined. We emphasize quality reconstruction and interactive rendering, which leads us to a solution using graphics hardware to perform on-the-fly decompression during rendering. In this paper we present a solution which addresses the need for data reduction in large supercomputing environments where data resulting from simulations occupies tremendous amounts of storage. Our solution employs a lossy encoding scheme to acrueve data reduction with several options in terms of rate-distortion behavior. We focus on encoding of multiple variables together, with optional compression in space and time. The compressed volumes can be rendered directly with commodity graphics cards at interactive frame rates and rendering quality similar to that of static volume renderers. Compression results using a multivariate time-varying data set indicate that encoding multiple variables results in acceptable performance in the case of spatial and temporal encoding as compared to independent compression of variables. The relative performance of spatial vs. temporal compression is data dependent, although temporal compression has the advantage of offering smooth animations, while spatial compression can handle volumes of larger dimensions.

  19. Silver State Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    State Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Silver State Geothermal Project Project Location Information Coordinates...

  20. Orita 3 Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    3 Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Orita 3 Geothermal Project Project Location Information Coordinates...

  1. Panther Canyon Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    Canyon Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Panther Canyon Geothermal Project Project Location Information...

  2. Kelsey North Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    North Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Kelsey North Geothermal Project Project Location Information...

  3. Devil's Canyon Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    Canyon Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Devil's Canyon Geothermal Project Project Location Information...

  4. Dead Horse Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    Horse Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Dead Horse Geothermal Project Project Location Information...

  5. Delcer Butte Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    Butte Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Delcer Butte Geothermal Project Project Location Information...

  6. Drum Mountain Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    Mountain Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Drum Mountain Geothermal Project Project Location Information...

  7. Puna Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    Puna Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Puna Geothermal Project Project Location Information Coordinates...

  8. Reese River Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    River Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Reese River Geothermal Project Project Location Information...

  9. Baltazor Springs Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    Baltazor Springs Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Baltazor Springs Geothermal Project Project Location...

  10. Eleventh annual international Pittsburgh coal conference proceedings: Volume 2

    SciTech Connect (OSTI)

    Chiang, S.H.

    1994-12-31

    The conference presented over 300 papers in 39 separate sessions. These presentations are grouped into five topical areas: the technologies in pre- and post-utilization of coal; research and development in coal conversion; advanced coal combustion; environmental control technologies, and environmental policy issues related to coal use. The program has expanded its coverage in non-fuel use of coal. This is reflected in the three sessions on use of coal in the steel industry, and a sessions on carbon products and non-fuel coal applications. Volume 2 includes the following topics: Environmental systems and technologies/Environmental policy; Coal drying, dewatering and reconstitution; Coal cleaning technology; Slurry bed technology; Coal syngas, methanol, DME, olefins and oxygenates; Environmental issues in energy conversion technology; Applied coal geology; Use of coal in the steel industry; Recent developments in coal preparation; International coal gasification projects; Progress on Clean Coal projects; Retrofit air quality control technologies;Fluidized bed combustion; Commercialization of coal preparation technologies; Integrated gasification combined cycle program; the US Department of Energy`s Combustion 2000 program; and Environmental issues in coal utilization. All papers have been processed separately for inclusion on the data base.

  11. Project Reports for Hualapai Tribe- 2005 Project

    Broader source: Energy.gov [DOE]

    The Hualapai Tribe is located on the end of their existing utility grid which has subjected them to high costs and poor reliability of electric service. The first phase of the project will establish a tribally operated utility to provide service to tribal customers at Grand Canyon West, which has been operating without grid power for the past seven years. The second phase of the project will examine the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation.

  12. Battleground Energy Recovery Project

    SciTech Connect (OSTI)

    Daniel Bullock

    2011-12-31

    In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and ? Create a Showcase Waste Heat Recovery Demonstration Project.

  13. Structuring small projects

    SciTech Connect (OSTI)

    Pistole, C.O.

    1995-11-01

    One of the most difficult hurdles facing small project developers is obtaining financing. Many major banks and institutional investors are unwilling to become involved in projects valued at less than $25 million. To gain the interest of small project investors, developers will want to present a well-considered plan and an attractive rate of return. Waste-to-energy projects are one type that can offer diversified revenue sources that assure maximum profitability. The Ripe Touch Greenhouse project, a $14.5 million waste tire-to-energy facility in Colorado, provides a case study of how combining the strengths of the project partners can help gain community and regulatory acceptance and maximize profit opportunities.

  14. Method of measuring a liquid pool volume

    DOE Patents [OSTI]

    Garcia, G.V.; Carlson, N.M.; Donaldson, A.D.

    1991-03-19

    A method of measuring a molten metal liquid pool volume and in particular molten titanium liquid pools is disclosed, including the steps of (a) generating an ultrasonic wave at the surface of the molten metal liquid pool, (b) shining a light on the surface of a molten metal liquid pool, (c) detecting a change in the frequency of light, (d) detecting an ultrasonic wave echo at the surface of the molten metal liquid pool, and (e) computing the volume of the molten metal liquid. 3 figures.

  15. Multiple volume compressor for hot gas engine

    DOE Patents [OSTI]

    Stotts, Robert E. (Clifton Park, NY)

    1986-01-01

    A multiple volume compressor for use in a hot gas (Stirling) engine having a plurality of different volume chambers arranged to pump down the engine when decreased power is called for and return the working gas to a storage tank or reservoir. A valve actuated bypass loop is placed over each chamber which can be opened to return gas discharged from the chamber back to the inlet thereto. By selectively actuating the bypass valves, a number of different compressor capacities can be attained without changing compressor speed whereby the capacity of the compressor can be matched to the power available from the engine which is used to drive the compressor.

  16. Gasification Systems Project Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Information Gasifier Optimization Archived Projects Agreement Number Project Title Performer Name Technology Area FE0023497 Alstom's Limestone Chemical Looping Gasification Process for High Hydrogen Syngas Generation Alstom Power, Inc Gasification Systems FE0023577 Advanced Gasifier and Water Gas Shift Technologies for Low Cost Coal Conversion to High Hydrogen Syngas Gas Technology Institute Coal & Coal-Biomass to Liquids, Gasification Systems FE0023915 Pilot Scale Operation and

  17. Funding for CSES Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Funding for CSES Projects Funding for CSES Projects High quality, cutting-edge science in the areas of astrophysics, space physics, solid planetary geoscience, and climate science. Contact Director Reiner Friedel (505) 665-1936 Email Professional Staff Assistant Georgia D. Sanchez (505) 665-0855 Email CSES Student and Postdoctoral Fellow Program Funding intervals are based on the federal fiscal year spanning the year from October 1 through September 30 of the following year. For all projects

  18. Infrastructure Projects | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Infrastructure Projects June 3, 2010 What do you think of the TEDF? How about the UIM project? What would have happened if we had not got the ARRA funding for the NP GPP projects last year? Gobbledegook!? Acronymia? Certainly different from the usual PREx, or QWeak, or DVCS that we hear from the physics side of the house! TEDF, UIM and the others are acronyms used by the facilities people, those trying to build, modernize and maintain our infrastructure. TEDF (Technology and Engineering

  19. Microwave solidification project overview

    SciTech Connect (OSTI)

    Sprenger, G.

    1993-01-01

    The Rocky Flats Plant Microwave Solidification Project has application potential to the Mixed Waste Treatment Project and the The Mixed Waste Integrated Program. The technical areas being addressed include (1) waste destruction and stabilization; (2) final waste form; and (3) front-end waste handling and feed preparation. This document covers need for such a program; technology description; significance; regulatory requirements; and accomplishments to date. A list of significant reports published under this project is included.

  20. Tribal Energy Projects

    Energy Savers [EERE]

    PROJECTS U.S. DEPARTMENT OF ENERGY U.S. DEPARTMENT OF ENERGY OFFICE OF ENERGY EFFICIENCY AND RENEWABLE ENERGY OFFICE OF ENERGY EFFICIENCY AND RENEWABLE ENERGY TRIBAL ENERGY PROGRAM TRIBAL ENERGY PROGRAM DOE's Tribal Energy Program DOE's Tribal Energy Program Tribal Energy Projects Tribal Energy Projects First Steps Toward Developing Renewable Energy and Energy Efficiency * Strategic planning * Energy options analysis * Capacity building * Organizational development Renewable Energy Development

  1. Project Submission Template

    Energy Savers [EERE]

    Cooperation Project Title: Country/Organizations: Foreign: Foreign POC: U.S: U.S. POC: Technology Area: Scope of Collaborative Research and Development: Justification of Approach: Work Completed to Date: Overview of Proposed Scope for FY12: Summary Brief Description of Specific Project(s): Timeline: Estimated Cost: Status: CONTINUATION or NEW? Type of Contracting Instrument: (Int'l agreements, lab-lab agreement, etc) Participant Organizations General Scope Budget Foreign (Technical Scope) US

  2. Evaluation Project 4492

    National Nuclear Security Administration (NNSA)

    12-2010 NNSA-B-10-0412 Sandia National Laboratories/New Mexico (SNL/NM) proposes to support the Bio-Response Operational Testing and Evaluation (BOTE) project. The BOTE project would involve multiple releases of a biological simulant, characterization sampling, decontamination, and clearance sampling, at the Idaho National Laboratory (INL) Test Site. Sandia Site Office Bio-Response Operational Testing and Evaluation (BOTE) Project (TA-I, TA-III, & Offsite at INL) INL LACY,SUSAN DOYLENE

  3. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  4. Penobscot Tribe- 2012 Project

    Broader source: Energy.gov [DOE]

    With this award, the Penobscot Indian Nation will advance the preconstruction activities required to secure funding for the proposed 227-megawatt (MW) Alder Stream wind project.

  5. NREL: Biomass Research - Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Spectrometer analyzes vapors during the gasification and pyrolysis processes. NREL's biomass projects are designed to advance the production of liquid transportation fuels from...

  6. Pit 9 Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 11, 2007 Pit 9 Project Structures Removed For many years, the Pit 9 project at the Department of Energy's Idaho Site was the symbol of frustration for its cleanup program. All of that is coming to a close now, however, as North Wind, Inc. and its subcontractors are successfully tearing down and removing the structures and equipment left over by the original subcontractor for the Pit 9 project. The goal of this dismantlement and disposal project is to remove buildings and equipment to allow

  7. Production Project Accounts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    accounting logs. PIs and PI Proxies can request a Project Account by logging into nim and selecting "Request a Collaboration Account" under the blue "Actions" tab. Accessing...

  8. The MAJORANA project

    SciTech Connect (OSTI)

    Elliott, Steven R [Los Alamos National Laboratory

    2009-01-01

    The Majorana Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

  9. Mascoma: Frontier Biorefinery Project

    Broader source: Energy.gov [DOE]

    This project involves the construction and operation of a biorefinery that produces ethanol and other co-products from cellulosic materials through advanced consolidated bioprocessing.

  10. Fit for Purpose Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    that needs to be addressed by current and future Fit-for-Purpose projects includes: Reservoir pressure management - In deep saline formations, pressure increases due to...

  11. Funding for IGPPS Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    which may, in certain circumstances, require several months to implement after the start of the fiscal year. For all projects supported with Los Alamos National Laboratory...

  12. Classroom Projects - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford For Students and Kids Classroom Projects Hanford For Students and Kids Hanford Fun Facts Classroom Projects Famous People of Hanford Classroom Projects Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size If you've been assigned to write a report or complete a classroom assignment that involves Hanford, we've got some tools that might help you with your project! Photographs The first is an online photo gallery of pictures. We've got thousands of photographs

  13. Custom Renewable Energy Projects

    Broader source: Energy.gov [DOE]

    Project development assistance funding is available for a variety of purposes, including grant writing, feasibility studies, or technical assistance with design, permitting, or utility interconne...

  14. NREL: Transportation Research - Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects 3-D illustration of tractor trailor cab, garbage truck, and car. NREL research helps optimize the energy efficiency of a wide range of vehicle technologies and...

  15. Major Capital Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BPA on 242015 and does not contain Agency-approved Financial Information. 1 Includes capital projects authorized at the agency level since August 2007 2 Direct capital costs...

  16. Major Capital Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BPA on 622014 and does not contain Agency-approved Financial Information. 1 Includes capital projects authorized at the agency level since August 2007 2 Direct capital costs...

  17. Major Capital Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    on 1142014 and does not contain Agency-approved Financial Information. 1 Includes capital projects authorized at the agency level since August 2007 2 Direct capital costs...

  18. Major Capital Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    on 2112014 and does not contain Agency-approved Financial Information. 1 Includes capital projects authorized at the agency level since August 2007 2 Direct capital costs...

  19. Final Project Report

    SciTech Connect (OSTI)

    Wang, Qiang; Dandy, David S.

    2015-05-15

    This is the final technical report of the DOE project DE-FG02-07ER46448 awarded to Colorado State University.

  20. Contract/Project Management

    Office of Environmental Management (EM)

    Second Quarter Overall Root Cause Analysis (RCA)/Corrective Action Plan (CAP) Performance Metrics 1 Contract/Project Management Performance Metric FY 2013 Target FY 2013 Forecast FY 2013 Pre- & Post-CAP* Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 83% Construction 85% Cleanup 80% 70% Pre-CAP 84% Post-CAP This is based on a 3- year rolling average (FY11 to FY13). TPC is Total Project Cost.

  1. Contract/Project Management

    Office of Environmental Management (EM)

    3 Third Quarter Overall Root Cause Analysis (RCA)/Corrective Action Plan (CAP) Performance Metrics 1 Contract/Project Management Performance Metric FY 2013 Target FY 2013 Forecast FY 2013 Pre- & Post-CAP* Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 83% Construction 85% Cleanup 80% 70% Pre-CAP 84% Post-CAP This is based on a 3- year rolling average (FY11 to FY13). TPC is Total Project Cost.

  2. Portable Power Projects

    Broader source: Energy.gov [DOE]

    DOE's Portable Power, Auxiliary Power Units, and R&D for Off-Road Fuel Cell Applications Research Projects Awarded April 2004

  3. Project Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Reports Project Reports This page contains links to project reports summarizing the solid-state lighting projects funded by DOE, providing project descriptions and information on project partners, funding, and research period. The following documents are available as Adobe Acrobat PDFs. Download Adobe Reader. 2015 Project Portfolio Overviews of all current DOE-funded R&D projects related to solid-state lighting, including brief description, partners, funding level, and proposed time

  4. Project Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Management Project Management Some of the Project Management Division’s many functions involve developing risk management plans, managing project risks, and providing input on prime contractor performance. Some of the Project Management Division's many functions involve developing risk management plans, managing project risks, and providing input on prime contractor performance. Employees in our Project Management Division address projects' planning and execution, as specified in

  5. Product Guide Product Guide Volumes Category Prices Table Crude...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    suppliers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -- 49 Product Guide Volumes Category Prices Table Energy Information Administration Petroleum...

  6. PARC Periodical | Volume 7, Issue 2 | Photosynthetic Antenna Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center 2 December 7, 2015 PARC Periodical | Volume 7, Issue 2 VIEW ARTICLE HERE

  7. Product Guide Product Guide Volumes Category Prices Table Crude...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -- 49 Product Guide Volumes Category Prices Table Energy Information Administration Petroleum Marketing...

  8. Recovery of Navy distillate fuel from reclaimed product. Volume II. Literature review

    SciTech Connect (OSTI)

    Brinkman, D.W.; Whisman, M.L.

    1984-11-01

    In an effort to assist the Navy to better utilize its waste hydrocarbons, NIPER, with support from the US Department of Energy, is conducting research designed to ultimately develop a practical technique for converting Reclaimed Product (RP) into specification Naval Distillate Fuel (F-76). This first phase of the project was focused on reviewing the literature and available information from equipment manufacturers. The literature survey has been carefully culled for methodology applicable to the conversion of RP into diesel fuel suitable for Navy use. Based upon the results of this study, a second phase has been developed and outlined in which experiments will be performed to determine the most practical recycling technologies. It is realized that the final selection of one particular technology may be site-specific due to vast differences in RP volume and available facilities. A final phase, if funded, would involve full-scale testing of one of the recommended techniques at a refueling depot. The Phase I investigations are published in two volumes. Volume 1, Technical Discussion, includes the narrative and Appendices I and II. Appendix III, a detailed Literature Review, includes both a narrative portion and an annotated bibliography containing about 800 references and abstracts. This appendix, because of its volume, has been published separately as Volume 2.

  9. Project Reports for Kootznoowoo Incorporated- 2010 Project

    Broader source: Energy.gov [DOE]

    Thayer Lake Hydropower Development (TLHD) consists of a 1 MW+ run of the river hydropower project located in the Tongass Forest in the Admiralty Island National Monument Park that will provide the energy to the City of Angoon and Angoon Community Association (traditional tribe as recognized by Indian Reorganization Act).

  10. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  11. Breckinridge Project, initial effort

    SciTech Connect (OSTI)

    1982-01-01

    Report IV, Volume 4, provides descriptions, data, and drawings pertaining to the Gas Plant (Plant 7). The Gas Plant (Plant 7) receives feed gas streams from various process plants. The Gas Plant compresses, treats, and fractionates the gas streams into intermediate and final products. The following information is included for the plant described in this volume: a description of the plant's process design, including the utility balance, catalysts and chemicals usage, and process flow diagrams; an equipment list, including item numbers and descriptions; data sheets and sketches for major plant components; and pertinent engineering drawings. An appendix contains: an overall site plan showing the locations of all plants; and the symbols and legend for the piping and instrument diagrams included in this volume.

  12. Hydropower Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects Hydropower Projects This report covers the Wind and Water Power Technologies Office's hydropower projects from fiscal years 2008 to 2014. PDF icon Hydropower Projects 2008-2014 More Documents & Publications Marine and Hydrokinetic Energy Projects Offshore Wind Projects Real World Demonstration of a New American Low-Head Hydropower Unit

  13. Coal slurry combustion and technology. Volume 2

    SciTech Connect (OSTI)

    Not Available

    1983-01-01

    Volume II contains papers presented at the following sessions of the Coal Slurry Combustion and Technology Symposium: (1) bench-scale testing; (2) pilot testing; (3) combustion; and (4) rheology and characterization. Thirty-three papers have been processed for inclusion in the Energy Data Base. (ATT)

  14. Natural gas annual 1992. Volume 2

    SciTech Connect (OSTI)

    Not Available

    1993-11-22

    This document provides information on the supply and disposition of natural gas to a wide audience including industry, consumers, Federal and State agencies, and educational institutions. This report, Volume 2, presents historical data for the Nation from 1930 to 1992, and by State from 1967 to 1992. The Supplement of this report presents profiles of selected companies.

  15. State authorization manual. Volume 2. Appendices

    SciTech Connect (OSTI)

    Brugler-Jones, S.

    1990-10-01

    The document provides the supportive appendices for Volume 1 of the State Authorization Manual (SAM), which provides guidance for States applying for program revisions to their authorized RCRA State program. Among the appendices are: various program checklists, lists of revision checklists by cluster, model Federal Register Notices, guidance for State Authorization Files, and guidance for using Wordperfect files and for CFR files.

  16. 2013 BNL Site Environmental Report. Volume 1

    SciTech Connect (OSTI)

    Ratel, K.; Remien, J.; Pohlot, P.; Williams, J.; Green, T.; Paquette, P.; Dorsch, W.; Welty, T.; Burke, J.

    2014-10-01

    A summary of Brookhaven National Laboratory’s (BNL) Site Environmental Report, meant to inform the public, regulators, employees, and other stakeholders of the Laboratory’s environmental performance in the lab’s surrounding area during the calendar year. The review is comprised of multiple volumes relevant to environmental data/environmental management performance and groundwater status report.

  17. Blanket comparison and selection study. Volume II

    SciTech Connect (OSTI)

    Not Available

    1983-10-01

    This volume contains extensive data for the following chapters: (1) solid breeder tritium recovery, (2) solid breeder blanket designs, (3) alternate blanket concept screening, and (4) safety analysis. The following appendices are also included: (1) blanket design guidelines, (2) power conversion systems, (3) helium-cooled, vanadium alloy structure blanket design, (4) high wall loading study, and (5) molten salt safety studies. (MOW)

  18. Bibliography of Utah radioactive occurrences. Volume II

    SciTech Connect (OSTI)

    Doelling, H.H.

    1983-07-01

    The references in this bibliography were assembled by reviewing published bibliographies of Utah geology, unpublished reports of the US Geological Survey and the Department of Energy, and various university theses. Each of the listings is cross-referenced by location and subject matter. This report is published in two volumes.

  19. Bibliography of Utah radioactive occurrences. Volume I

    SciTech Connect (OSTI)

    Doelling, H.H. comp.

    1983-07-01

    The references in this bibliography were assembled by reviewing published bibliographies of Utah geology, unpublished reports of the US Geological Survey and the Department of Energy, and various university theses. Each of the listings is cross-referenced by location and subject matter. This report is published in two volumes.

  20. Site Environmental Report for 2008, Volume 1

    SciTech Connect (OSTI)

    Lackner, Regina; Baskin, David; Fox, Robert; Jelinski, John; Pauer, Ron; Thorson, Patrick; Wahl, Linnea; Xu, Suying

    2009-09-21

    The Site Environmental Report for 2008 is an integrated report on the environmental programs at Lawrence Berkeley National Laboratory and satisfies the requirements of DOE order 231.1A, Environment, Safety, and Health Reporting. Volume II contains individual data results from surveillance and monitoring activities

  1. Petroleum supply annual 1993. Volume 2

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This publication contains information on the supply and disposition of crude oil and petroleum products. The publication reflects data that were collected from the petroleum industry during 1993 through annual and monthly surveys. This second volume contains final statistics for each month of 1993.

  2. Wind Energy Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Wind Energy Projects Wind Energy Projects Wind Energy Projects Wind Energy Projects Wind Energy Projects Wind Energy Projects Wind Energy Projects Wind Energy Projects Wind Energy Projects Wind Energy Projects Wind Energy Projects Wind Energy Projects WIND ENERGY 4 PROJECTS in 5 LOCATIONS 1,025 MW GENERATION CAPACITY 2,190,000 MWh PROJECTED ANNUAL GENERATION * 1,225,000 METRIC TONS OF CO2 EMISSIONS PREVENTED ANNUALLY ALL FIGURES AS OF MARCH 2015 * Calculated using the project's and NREL

  3. Project organizations and schedules

    SciTech Connect (OSTI)

    Briggs, R.J.

    1990-07-01

    The Superconducting Super Collider Laboratory (SSCL) faces the challenge of simultaneously carrying out a large-scale construction project with demanding cost, schedule, and performance goals; and creating a scientific laboratory capable of exploiting this unique scientific instrument. This paper describes the status of the laboratory organization developed to achieve these goals, and the major near-term schedule objectives of the project.

  4. The human genome project

    SciTech Connect (OSTI)

    Yager, T.D.; Zewert, T.E.; Hood, L.E. )

    1994-04-01

    The Human Genome Project (HGP) is a coordinated worldwide effort to precisely map the human genome and the genomes of selected model organisms. The first explicit proposal for this project dates from 1985 although its foundations (both conceptual and technological) can be traced back many years in genetics, molecular biology, and biotechnology. The HGP has matured rapidly and is producing results of great significance.

  5. The Home Microbiome Project

    SciTech Connect (OSTI)

    Gilbert, Jack

    2014-08-25

    The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

  6. Coal. [Great Plains Project

    SciTech Connect (OSTI)

    Not Available

    1981-03-01

    The status of various research projects related to coal is considered: gasification (approximately 30 processes) and in-situ gasification. Methanol production, retrofitting internal combustion engines to stratified charge engines, methanation (Conoco), direct reduction of iron ores, water resources, etc. Approximately 200 specific projects related to coal are considered with respect to present status. (LTN)

  7. The Home Microbiome Project

    ScienceCinema (OSTI)

    Gilbert, Jack

    2014-09-15

    The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

  8. PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and

    Office of Environmental Management (EM)

    Risk Assessment Examples Example 54 10.0 PROJECT RISK This section outlines a methodology which will be used to qualitatively/subjectively assess the project risk. The approach is modeled after project risk assessment processes outlined in standard project management texts and training courses but tailored to the unique risks encountered in the DOE projects. In the context of this section, project risk means risk to one of the project baselines (technical, cost, or schedule) and should not be

  9. Project Reports for Seneca Nation - 2007 Project | Department of Energy

    Energy Savers [EERE]

    Seneca Nation - 2007 Project Project Reports for Seneca Nation - 2007 Project On the three territories of the Seneca Nation, there exist opportunities for energy development from both renewable and nonrenewable resources. Learn more about this project or find details in the below status reports. PDF icon November 2007 status report PDF icon November 2008 status report PDF icon Final report More Documents & Publications Project Reports for Seneca Nation - 2003 Project Project Reports for

  10. GAD (Smart Grid Project) | Open Energy Information

    Open Energy Info (EERE)

    Projects in Europe Smart Grid Projects - Smart Meter and AMI Smart Grid Projects - Integrated System Smart Grid Projects - Home application Smart Grid Projects - Customer Behavior...

  11. Address (Smart Grid Project) | Open Energy Information

    Open Energy Info (EERE)

    Categories: Smart Grid Projects Smart Grid Projects in Europe Smart Grid Projects - Integrated System Smart Grid Projects - Home application Smart Grid Projects - Customer Behavior...

  12. 2016 Project Portfolio | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Project Portfolio 2016 Project Portfolio PDF icon 2016ssl-project-portfolio.pdf More Documents & Publications 2015 Project Portfolio 2014 Solid-State Lighting Project Portfolio ...

  13. HRC steel mill project. Volume 2. Final report. Export trade information

    SciTech Connect (OSTI)

    1995-08-01

    The initial step in developing the design for a steel producing facility is the selection of the major processes to be used. This study investigated five steelmaking processes to determine the one(s) best suited for Grasim based on technical and cost performance. The processes were: Electric Arc Furnace; Induction Furnace/BOF; KS Furnace; Cupola; and Submerged Arc. This investigation determined that the electric arc furnace (EAF) was the most suitable melting process for the production of steel using DRI feed stock.

  14. Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report calendar year 1992: Volume 2

    SciTech Connect (OSTI)

    1993-12-31

    This report contains environmental monitoring information for the following UMTRA sites for the 1992 Calendar Year: Lakeview, OR; Lowman, ID; Mexican Hat, UT; Monument Valley, AZ; Rifle, CO; Riverton, WY; Shiprock, NM; Spook, WY; Tuba City, AZ. Each site report contains a site description, compliance summary, environmental program information, environmental radiological and non-radiological program information, water resources protection, and quality assurance information.

  15. Lexington-Blue Grass Depot Activity, EEAP Project No. 208; volume 1 - executive summary. Final report

    SciTech Connect (OSTI)

    NONE

    1984-01-01

    This report is a product of the Army Facilities Energy Plan. The plan`s goals are: To reduce baseline FY 1975 total facilities energy consumption (BTU) 20 percent by FY 1985 and 40 percent by FY 2000. To develop the capabilities to use synthetic gases by FY 2000. To reduce heating oil consumption by 75 percent by FY 2000. Five programs have been established to help achieve the above goals. The programs are: (1) The Energy Engineering Analysis Program (EEAP). (2) The Energy Conservation Investment Program (ECIP). (3) The Energy Conservation and Management Program (ECAM). (4) Solid Fuels Conversion Program. (5) The Boiler Efficiency Improvement Program (BEIP).

  16. Mixed and low-level waste treatment facility project. Volume 3, Waste treatment technologies (Draft)

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    The technology information provided in this report is only the first step toward the identification and selection of process systems that may be recommended for a proposed mixed and low-level waste treatment facility. More specific information on each technology will be required to conduct the system and equipment tradeoff studies that will follow these preengineering studies. For example, capacity, maintainability, reliability, cost, applicability to specific waste streams, and technology availability must be further defined. This report does not currently contain all needed information; however, all major technologies considered to be potentially applicable to the treatment of mixed and low-level waste are identified and described herein. Future reports will seek to improve the depth of information on technologies.

  17. Project planning workshop 6-GeV synchrotron light source: Volume 2

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    A series of work sheets, graphs, and printouts are given which detail the work breakdown structure, cost, and manpower requirements for the 6 GeV Synchrotron Light Source. (LEW)

  18. Breckinridge Project, initial effort. Report VII, Volume III. Cultural resource assessment socioeconomic background data

    SciTech Connect (OSTI)

    Macfarlane, Heather; Janzen, Donald E.

    1980-11-26

    This report has been prepared in conjunction with an environmental baseline study for a commercial coal conversion facility being conducted by Ashland Synthetic Fuels, Inc. (ASFI) and Airco Energy Company (AECO). This report represents a cultural resource assessment for the proposed plant site and two potential solid waste disposal areas. This assessment presents data collected by Dames and Moore during a recent archaeological reconnaissance of the unsurveyed southeastern portion of the proposed plant site and two potential solid waste disposal areas. Also, results of two previous surveys on the northern and southwestern portion of the plant site for American Smelting and Refining Company (ASARCO) and Kentucky Utilities are included. The Dames and Moore survey of the southeastern portion of the plant site identified one archaeological site, three standing structures and one historic cemetery. In addition 47 archaeological sites and six standing structures are known from two previous surveys of the remainder of the plant site (Cowan 1975 and Turnbow et al 1980). Eleven of the previously recorded archaeological sites were recommended for further assessment to evaluate their potential for inclusion within the Holt Bottoms Archaeological District currently listed on the National Register of Historic Places. None of the archaeological sites or standing structures located within the plant site during the Dames and Moore survey were recommended for further assessment. A total of eight archaeological sites were located during the Dames and Moore survey of the two potential solid waste disposal areas. Of this total only two sites were recommended for further assessment. Also, one previously unknown historic cemetry was located in the southernmost potential waste disposal area.

  19. Breckinridge Project, initial effort

    SciTech Connect (OSTI)

    1982-01-01

    Report IV, Volume 6 provides descriptions, data, and drawings pertaining to Gasification and Purification (Plant 12). Gasification and Purification (Plant 12) produces makeup hydrogen for H-COAL Preheating and Reaction (Plant 3), and produces a medium Btu fuel gas for consumption in fired heaters. The following information is included: a description of the plant's process design, including the utility balance, catalysts and chemicals usage, and a process flow diagram; an equipment list, including item numbers and descriptions; data sheets and sketches for major plant components; and pertinent engineering drawings. An appendix contains: an overall site plan showing the locations of all plants; and the symbols and legend for the piping and instrument diagrams included in this volume. Gasification and Purification (Plant 12) utilizes process technology from three licensors: gasification of vacuum bottoms using the Texaco process, shift conversion using the Haldor Topsoe process, and purification of fuel gas and shifted gas using the Allied Chemical Selexol process. This licensed technology is proprietary in nature. As a result, this volume does not contain full disclosure of these processes although a maximum of information has been presented consistent with the confidentiality requirements. Where data appears incomplete in this volume, it is due to the above described limitations. Full data concerning this plant are available for DOE review at the Houston offices of Bechtel Petroleum, Inc.

  20. Project Reports for Yurok Tribe- 2005 Project

    Broader source: Energy.gov [DOE]

    The Yurok Tribe has a great need for improved energy services on the reservation. The members pay $328 per month per household on average for energy, with just a $9,000 median household income. The project will assess the need for energy efficiency services on the reservation, identify available resources, and develop an implementation plan for meeting these needs. With an unemployment rate of 42%, the job training component of this program will benefit the tribe. Past attempts have been made to provide energy efficiency and renewable energy maintenance services on the reservation, but many of these services have not endured because they were not tribe-driven. This project will build tribal expertise, increase awareness, and form collaborative relationships with local energy services.