Powered by Deep Web Technologies
Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

CHESTNUT RIDGE RD VALLEY ROAD  

E-Print Network (OSTI)

SIGN TO: OAK RIDGE, Y-12,AND KNOXVILLE CHESTNUT RIDGE ROAD FIRSTSTREET 95 95 HFIR and SNS Sites #12;SNS PARKING CNMS PARKING COVERED BRIDGE 8310 87008910 8913 8911 8100 8330 CHESTNUT RIDGE RD TO

2

Oak Ridge Environmental Management Program Completes Work at Bethel Valley  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ridge Environmental Management Program Completes Work at Bethel Ridge Environmental Management Program Completes Work at Bethel Valley Burial Grounds Oak Ridge Environmental Management Program Completes Work at Bethel Valley Burial Grounds September 1, 2011 - 12:00pm Addthis Media Contact Ben Williams http://www.oakridge.doe.gov 865-576-0885 OAK RIDGE, Tenn. - The U.S. Department of Energy's (DOE) Oak Ridge Environmental Management (EM) program recently completed upgrades and soil remediation work at the Bethel Valley Burial Grounds, using approximately $17.5 million in American Recovery and Reinvestment Act funds. Oak Ridge's EM program was able to use Recovery Act funds to address five areas needing improvement, including Solid Waste Storage Areas 1 and 3. This included removing contaminated soil ("hot spots"), diverting clean

3

West Valley Demonstration Project 10282 Rock Springs Road  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project West Valley Demonstration Project 10282 Rock Springs Road West Valley, NY 141 71 -9799 Mr. Daniel W. Coyne President & General Manager CH2M HILL B&W West Valley, LLC West Valley Demonstration Project 10282 Rock Springs Road West Valley, NY 141 71 -9799 ATTENTION: J. D. Rendall, Regulatory Strategy, AC-EA SUBJECT: Environmental Checklist WVDP-20 12-0 1, " WVDP Reservoir Interconnecting Canal Maintenance Activities" REFERENCE: Letter WD:2012:0409 (357953), D. W. Coyne to R. W. Reffner, "CONTRACT NO. DE-EM000 1529, Section 5-3, Item 105, NEPA Documentation (Transmittal of Environmental Checklist WVDP-20 12-0 1, WVDP Reservoir Interconnecting Canal Maintenance Activities), Revision 1 ," dated July 24, 20 12 Dear Mr. Coyne:

4

COMMUNITY AND EDAPHIC ANALYSIS OF MIXED OAK FORESTS IN RIDGE AND VALLEY PROVINCE OF CENTRAL PENNSYLVANIA  

E-Print Network (OSTI)

COMMUNITY AND EDAPHIC ANALYSIS OF MIXED OAK FORESTS IN RIDGE AND VALLEY PROVINCE OF CENTRAL). In this study, mixed oak stands on nine different physiographic units in the Ridge and Valley Province PENNSYLVANIA Gregory J. Nowacki and Marc D. Abrams 1 Abstract: Forty-two relatively undisturbed mixed oak

Abrams, Marc David

5

EA-1044: Melton Valley Storage Tanks Capacity Increase Project- Oak Ridge  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

44: Melton Valley Storage Tanks Capacity Increase Project- Oak 44: Melton Valley Storage Tanks Capacity Increase Project- Oak Ridge National Laboratory, Oak Ridge, Tennessee EA-1044: Melton Valley Storage Tanks Capacity Increase Project- Oak Ridge National Laboratory, Oak Ridge, Tennessee SUMMARY This EA evaluates the environmental impacts of the proposal to construct and maintain additional storage capacity at the U.S. Department of Energy's Oak Ridge National Laboratory, Oak Ridge, Tennessee, for liquid low-level radioactive waste. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD May 25, 1995 EA-1044: Finding of No Significant Impact Melton Valley Storage Tanks Capacity Increase Project- Oak Ridge National Laboratory, Oak Ridge, Tennessee May 25, 1995 EA-1044: Final Environmental Assessment

6

White Oak Creek watershed: Melton Valley area Remedial Investigation report, at the Oak Ridge National Laboratory, Oak Ridge, Tennessee: Volume 2, Appendixes A and B  

SciTech Connect

This document contains Appendixes A ``Source Inventory Information for the Subbasins Evaluated for the White Oak Creek Watershed`` and B ``Human Health Risk Assessment for White Oak Creek / Melton Valley Area`` for the remedial investigation report for the White Oak Creek Watershed and Melton Valley Area. Appendix A identifies the waste types and contaminants for each subbasin in addition to the disposal methods. Appendix B identifies potential human health risks and hazards that may result from contaminants present in the different media within Oak Ridge National Laboratory sites.

NONE

1996-11-01T23:59:59.000Z

7

EA-1980: Spar Canyon-Round Valley Access Road System Improvements...  

Energy Savers (EERE)

proposed improvements to the access road system for its existing Spar Canyon-Round Valley Transmission Line located on BLM land in Custer County, Idaho. Additional information is...

8

Long-term impacts of deer exclosures on mixed-oak forest composition at the Valley Forge National Historical Park,  

E-Print Network (OSTI)

Long-term impacts of deer exclosures on mixed-oak forest composition at the Valley Forge National 16802). Long-term impacts of deer exclosures on mixed-oak forest composition at the Valley Forge virginianus, Quercus, Valley Forge National Historical Park. Long-term studies of forest dynamics indi- cate

Abrams, Marc David

9

White Oak Creek Watershed: Melton Valley Area Remedial Investigation Report, Oak Ridge National Laboratory, Oak Ridge, Tennessee: Volume 3 Appendix C  

SciTech Connect

This report provides details on the baseline ecological risk assessment conducted in support of the Remedial Investigation (RI) Report for the Melton Valley areas of the White Oak Creek watershed (WOCW). The RI presents an analysis meant to enable the US Department of Energy (DOE) to pursue a series of remedial actions resulting in site cleanup and stabilization. The ecological risk assessment builds off of the WOCW screening ecological risk assessment. All information available for contaminated sites under the jurisdiction of the US Department of Energy`s Comprehensive Environmental Response, Compensation, and Liability Act Federal Facilities Agreement within the White Oak Creek (WOC) RI area has been used to identify areas of potential concern with respect to the presence of contamination posing a potential risk to ecological receptors within the Melton Valley area of the White Oak Creek watershed. The risk assessment report evaluates the potential risks to receptors within each subbasin of the watershed as well as at a watershed-wide scale. The WOC system has been exposed to contaminant releases from Oak Ridge National Laboratory and associated operations since 1943 and continues to receive contaminants from adjacent waste area groupings.

NONE

1996-11-01T23:59:59.000Z

10

PRESOLICITATION Category: A. Owner: Department of Energy, Oak Ridge National Laboratory -UT Battelle LLC (DOE Contractor), Oak Ridge National Laboratory, Bethel  

E-Print Network (OSTI)

PRESOLICITATION Category: A. Owner: Department of Energy, Oak Ridge National Laboratory - UT Battelle LLC (DOE Contractor), Oak Ridge National Laboratory, Bethel Valley Road P.O. Box 2008, Oak Ridge-Battelle), the management and operating contractor for the United States Department of Energy's Oak Ridge National

Hively, Lee M.

11

Phase 1 report on the Bear Creek Valley treatability study, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

Bear Creek Valley (BCV) is located within the US Department of Energy (DOE) Oak Ridge Reservation and encompasses multiple waste units containing hazardous and radioactive wastes associated with past operations at the adjacent Oak Ridge Y-12 Plant. The BCV Remedial Investigation determined that disposal of wastes at the S-3 Site, Boneyard/Burnyard (BYBY), and Bear Creek Burial Grounds (BCBG) has caused contamination of both deep and shallow groundwater. The primary contaminants include uranium, nitrate, and VOCs, although other metals such as aluminum, magnesium, and cadmium persist. The BCV feasibility study will describe several remedial options for this area, including both in situ and ex situ treatment of groundwater. This Treatability Study Phase 1 Report describes the results of preliminary screening of treatment technologies that may be applied within BCV. Four activities were undertaken in Phase 1: field characterization, laboratory screening of potential sorbents, laboratory testing of zero valent iron products, and field screening of three biological treatment systems. Each of these activities is described fully in technical memos attached in Appendices A through G.

NONE

1997-04-01T23:59:59.000Z

12

Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste fadities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCIA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RIFA)/RCRA Facility Investigation (RFI)/Coffective Measures Study (CMS)/Corrective Measures Implementation process. Under CERCLA, the actions follow the Pre@ary Assessment/Site Investigation (PA/Sl) Remedial Investigation Feasibility Study (RI/FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCIA into an RI Work Plan for the lint phase of characterization of Bear Creek Valley (BCV) Operable Unit (OU) 4.

Not Available

1992-12-01T23:59:59.000Z

13

EA-1980: Spar Canyon-Round Valley Access Road System Improvements, Custer County, Idaho  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to assess potential environmental impacts of proposed improvements to the access road system for its existing Spar Canyon-Round Valley Transmission Line located on Bureau of Land Management land in Custer County, Idaho.

14

White Oak Creek Watershed: Melton Valley Area Remedial Investigation Report, Oak Ridge National Laboratory, Oak Ridge, Tennessee: Volume 1 Main Text  

SciTech Connect

The purpose of this Remedial Investigation (RI) report is to present an analysis of the Melton Valley portion of the White Oak Creek (WOC) watershed, which will enable the US Department of Energy (DOE) to pursue a series of cost-effective remedial actions resulting in site cleanup and stabilization. In this RI existing levels of contamination and radiological exposure are compared to levels acceptable for future industrial and potential recreational use levels at the site. This comparison provides a perspective for the magnitude of remedial actions required to achieve a site condition compatible with relaxed access restrictions over existing conditions. Ecological risk will be assessed to evaluate measures required for ecological receptor protection. For each subbasin, this report will provide site-specific analyses of the physical setting including identification of contaminant source areas, description of contaminant transport pathways, identification of release mechanisms, analysis of contaminant source interactions with groundwater, identification of secondary contaminated media associated with the source and seepage pathways, assessment of potential human health and ecological risks from exposure to contaminants, ranking of each source area within the subwatershed, and outline the conditions that remedial technologies must address to stop present and future contaminant releases, prevent the spread of contamination and achieve the goal of limiting environmental contamination to be consistent with a potential recreational use of the site.

NONE

1996-11-01T23:59:59.000Z

15

Radiological Assessment for the Vance Road Facility Source Vault, Oak Ridge Institute for Science and Education, Oak Ridge, Tennessee  

SciTech Connect

From the 1950s, the Vance Road laboratories had been used for a broad range of nuclear medicine research involving numerous radionuclides. These radionuclides were stored in the a source vault located on the first floor of the facility. The Environmental Survey and Site Assessment Program (ESSAP) of ORISE performed a radiological assessment survey of the source vault after it had been remediated and in preparation for converting the area to office space.

J. R. Morton

2000-09-01T23:59:59.000Z

16

Stratigraphic variations and secondary porosity within the Maynardville Limestone in Bear Creek Valley, Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

To evaluate groundwater and surface water contamination and migration near the Oak Ridge Y-12 plant, a Comprehensive Groundwater Monitoring Plan was developed. As part of the Maynardville exit pathways monitoring program, monitoring well clusters were ii installed perpendicular to the strike of the Maynardville Limestone, that underlies the southern part of the Y-12 Plant and Bear Creek Valley (BCV). The Maynardville Project is designed to locate potential exit pathways of groundwater, study geochemical characteristics and factors affecting the occurrence and distribution of water-bearing intervals, and provide hydrogeologic information to be used to reduce the potential impacts of contaminants entering the Maynardville Limestone.

Goldstrand, P.M. [Univ. of Nevada, Reno, NV (United States)

1995-05-01T23:59:59.000Z

17

Remedial investigation report on the Melton Valley watershed at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 3: Appendix C  

SciTech Connect

The Melton Valley watershed presents a multifaceted management and decision-making challenge because of the very heterogeneous conditions that exist with respect to contaminant type, disposal unit age, mode of disposal, release mechanism, and potential risk-producing pathways. The investigation presented here has assembled relevant site data in the geographic context with the intent of enabling program managers and decision-makers to understand site conditions and evaluate the necessity, relative priority, and scope of potential remedial actions. The industrial and recreational exposure scenarios are used to provide a risk assessment reference context to evaluate levels of contamination in surface water, groundwater, soil, and sediment within each subbasin of the Melton Valley watershed. All available analytical results for the media of interest that could be qualified for use in the risk assessment were screened to determine carcinogenic risk values and noncarcinogenic hazard indexes and to identify the chemicals of concern (COCs) for each evaluated media in each subbasin.

NONE

1997-05-01T23:59:59.000Z

18

Report on the remedial investigation of Bear Creek Valley at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 4: Appendix E -- Valley-wide fate and transport report  

SciTech Connect

This Remedial Investigation (RI) Report characterizes the nature and extent of contamination, evaluates the fate and transport of contaminants, and assesses risk to human health and the environment resulting from waste disposal and other US Department of Energy (DOE) operations in Bear Creek Valley (BCV). BCV, which is located within the DOE Oak Ridge Reservation (ORR) encompasses multiple waste units containing hazardous and radioactive wastes arising from operations at the adjacent Oak Ridge Y-12 Plant. The primary waste units discussed in this RI Report are the S-3 Site, Oil Landfarm (OLF), Boneyard/Burnyard (BYBY), Sanitary Landfill 1 (SL 1), and Bear Creek Burial Grounds (BCBG). These waste units, plus the contaminated media resulting from environmental transport of the wastes from these units, are the subject of this RI. This BCV RI Report represents the first major step in the decision-making process for the BCV watershed. The RI results, in concert with the follow-on FS will form the basis for the Proposed Plan and Record of Decision for all BCV sites. This comprehensive decision document process will meet the objectives of the watershed approach for BCV. Appendix E addresses contaminant releases and migration pathways from a valley-wide perspective and provides estimates of changes in contaminant fluxes in BCV.

NONE

1996-09-01T23:59:59.000Z

19

Report on the remedial investigation of Bear Creek Valley at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 6: Appendix G -- Baseline ecological risk assessment report  

SciTech Connect

This Remedial Investigation (RI) Report characterizes the nature and extent of contamination, evaluates the fate and transport of contaminants, and assesses risk to human health and the environment resulting from waste disposal and other US Department of Energy (DOE) operations in Bear Creek Valley (BCV). BCV, which is located within the DOE Oak Ridge Reservation (ORR) encompasses multiple waste units containing hazardous and radioactive wastes arising from operations at the adjacent Oak Ridge Y-12 Plant. The primary waste units discussed in this RI Report are the S-3 Site, Oil Landfarm (OLF), Boneyard/Burnyard (BYBY), Sanitary Landfill 1 (SL 1), and Bear Creek Burial Grounds (BCBG). These waste units, plus the contaminated media resulting from environmental transport of the wastes from these units, are the subject of this RI. This BCV RI Report represents the first major step in the decision-making process for the BCV watershed. The RI results, in concert with the follow-on FS will form the basis for the Proposed Plan and Record of Decision for all BCV sites. This comprehensive decision document process will meet the objectives of the watershed approach for BCV. Appendix G contains ecological risks for fish, benthic invertebrates, soil invertebrates, plants, small mammals, deer, and predator/scavengers (hawks and fox). This risk assessment identified significant ecological risks from chemicals in water, sediment, soil, and shallow ground water. Metals and PCBs are the primary contaminants of concern.

NONE

1996-09-01T23:59:59.000Z

20

Report on the remedial investigation of Bear Creek Valley at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1  

SciTech Connect

This Remedial Investigation (RI) Report characterizes the nature and extent of contamination, evaluates the fate and transport of contaminants, and assesses risk to human health and the environment resulting from waste disposal and other US Department of Energy (DOE) operations in Bear Creek Valley (BCV). BCV, which is located within the DOE Oak Ridge Reservation (ORR) encompasses multiple waste units containing hazardous and radioactive wastes arising from operations at the adjacent Oak Ridge Y-12 Plant. The primary waste units discussed in this RI Report are the S-3 Site, Oil Landfarm (OLF), Boneyard/Burnyard (BYBY), Sanitary Landfill 1 (SL 1), and Bear Creek Burial Grounds (BCBG). These waste units, plus the contaminated media resulting from environmental transport of the wastes from these units, are the subject of this RI. This BCV RI Report represents the first major step in the decision-making process for the BCV watershed. The RI results, in concert with the follow-on FS will form the basis for the Proposed Plan and Record of Decision for all BCV sites. This comprehensive decision document process will meet the objectives of the watershed approach for BCV.

NONE

1996-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Remedial Investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODS) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regime`s, which are labeled as integrator OUs. This Remedial Investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the Feasibility Study to evaluate all probable or likely alternatives.

Not Available

1993-09-01T23:59:59.000Z

22

Oak Ridge National Laboratory | Open Energy Information  

Open Energy Info (EERE)

Oak Ridge National Laboratory Oak Ridge National Laboratory Jump to: navigation, search Logo: Oak Ridge National Laboratory Name Oak Ridge National Laboratory Address 1 Bethel Valley Road Place Oak Ridge, Tennessee Zip 37831 Number of employees 1001-5000 Year founded 1943 Coordinates 35.9753705°, -84.237476° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.9753705,"lon":-84.237476,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

23

FY94 site characterization and multilevel well installation at a west Bear Creek Valley research site on the Oak Ridge Reservation  

SciTech Connect

The goals of this project are to collect data that will assist in determining what constitutes a representative groundwater sample in fractured shale typical of much of the geology underlying the ORR waste disposal sites, and to determine how monitoring-well construction and sampling methods impact the representativeness of the sample. This report details the FY94 field activities at a research site in west Bear Creek Valley on the Oak Ridge Reservation (ORR). These activities funded by the Energy Systems Groundwater Program Office through the Oak Ridge Reservation Hydrologic and Geologic Studies (ORRHAGS) task, focus on developing appropriate sampling protocols for the type of fractured media that underlies many of the ORR waste disposal sites. Currently accepted protocols were developed for porous media and are likely to result in nonrepresentative samples in fractured systems.

Moline, G.R. [Oak Ridge National Lab., TN (United States). Environmental Sciences Div.; Schreiber, M.E. [Univ. of Wisconsin, Madison, WI (United States). Dept. of Geology and Geophysics

1996-03-01T23:59:59.000Z

24

Oak Ridge National Laboratory | Open Energy Information  

Open Energy Info (EERE)

National Laboratory National Laboratory (Redirected from ORNL) Jump to: navigation, search Logo: Oak Ridge National Laboratory Name Oak Ridge National Laboratory Address 1 Bethel Valley Road Place Oak Ridge, Tennessee Zip 37831 Number of employees 1001-5000 Year founded 1943 Coordinates 35.9753705°, -84.237476° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.9753705,"lon":-84.237476,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

25

Remedial investigation report on the Melton Valley watershed at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 2: Appendixes A and B  

SciTech Connect

The Melton Valley watershed presents a multifaceted management and decision-making challenge because of the very heterogeneous conditions that exist with respect to contaminant type, disposal unit age, mode of disposal, release mechanism, and potential risk-producing pathways. The investigation presented here has assembled relevant site data in the geographic context with the intent of enabling program managers and decision-makers to understand site conditions and evaluate the necessity, relative priority, and scope of potential remedial actions. The industrial and recreational exposure scenarios are used to provide a risk assessment reference context to evaluate levels of contamination in surface water, groundwater, soil, and sediment within each subbasin of the Melton Valley watershed. All available analytical results for the media of interest that could be qualified for use in the risk assessment were screened to determine carcinogenic risk values and noncarcinogenic hazard indexes and to identify the chemicals of concern (COCs) for each evaluated media in each subbasin.

NONE

1997-05-01T23:59:59.000Z

26

Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.

NONE

1998-03-01T23:59:59.000Z

27

Report on the remedial investigation of Bear Creek Valley at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 3: Appendix D -- Nature and extent of contamination report  

SciTech Connect

This Remedial Investigation (RI) Report characterizes the nature and extent of contamination, evaluates the fate and transport of contaminants, and assesses risk to human health and the environment resulting from waste disposal and other US Department of Energy (DOE) operations in Bear Creek Valley (BCV). BCV, which is located within the DOE Oak Ridge Reservation (ORR) encompasses multiple waste units containing hazardous and radioactive wastes arising from operations at the adjacent Oak Ridge Y-12 Plant. The primary waste units discussed in this RI Report are the S-3 Site, Oil Landfarm (OLF), Boneyard/Burnyard (BYBY), Sanitary Landfill 1 (SL 1), and Bear Creek Burial Grounds (BCBG). These waste units, plus the contaminated media resulting from environmental transport of the wastes from these units, are the subject of this RI. This BCV RI Report represents the first major step in the decision-making process for the BCV watershed. The RI results, in concert with the follow-on FS will form the basis for the Proposed Plan and Record of Decision for all BCV sites. This comprehensive decision document process will meet the objectives of the watershed approach for BCV. Appendix D describes the nature and extent of contamination in environmental media and wastes.

NONE

1996-09-01T23:59:59.000Z

28

Lessons from long-term studies of harvest methods in southwestern ponderosa pineGambel oak forests on the Fort Valley Experimental Forest, Arizona, U.S.A.  

Science Journals Connector (OSTI)

The Fort Valley Experiment Station (now Fort Valley Experimental Forest) has contributed many long-term studies to forest research. This paper focuses on a Methods of Cutting study initiated in 1913 on the Coulter Ranch Unit of Fort Valley and how that long-term study yielded important ecological and management lessons. We quantified the historical and contemporary forest patterns at this ponderosa pineGambel oak site, which was harvested using three different harvesting systems in 1913 (seed tree, group selection, and light selection) and was partially excluded from livestock browsing in 1919. Using nine historically stem-mapped permanent plots for the following three stand structural scenarios: 1913 pre-harvest (modeled), post-harvest (actual), and 20032006 (actual) conditions, we examined the short- and long-term consequences of harvest and livestock grazing land-use and stand dynamics. We assessed changes in spatial pattern under each harvesting system and in each structural scenario, and lastly, we examined spatial and temporal tree recruitment patterns as observed in the contemporary (20032006) conditions. The seed tree harvests effectively converted the spatial patterns from aggregated to random and left few trees, while the group selection and light selection had varying effects, but consistently exaggerated the spatial patchiness of the stand. By 20032006, all plots were aggregated at all scales and were one large patch of predominately small trees. Sites that were harvested, but excluded from livestock browsing had 40% more trees in 20032006. Contemporary recruitment patterns were significantly aggregated under all harvesting systems, but were most strongly aggregated if the site received a group selection or light selection cut. For group and light selection, pine seedlings initially established in stump patches created by harvesting and then proceeded to fill-in the remaining area, with recruitment rarely found under the residual pine or oak trees. Long-term data sets, such as these established by the Fort Valley Experimental Forest in 1913, are essential for quantifying the impact of historical land-use practices on contemporary forest composition and structure. Ignoring land-use legacies may lead to the misinterpretation of stand dynamics and development, and therefore should be explicitly quantified and incorporated into future management and restoration activities.

Andrew J. Snchez Meador; Margaret M. Moore

2010-01-01T23:59:59.000Z

29

Oak Ridge Environmental Management Program Completes Work at...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Management Program Completes Work at Bethel Valley Burial Grounds Oak Ridge Environmental Management Program Completes Work at Bethel Valley Burial Grounds September...

30

Valley Road University Drive  

E-Print Network (OSTI)

WATER AND ENVIRONMENTAL SCIENCE BUILDING (WE) THE BREEZEWAY THE GROVE THE QUAD UNIVERSITY HALL (UH and Teaching (Trading Room) · Faculty of Health Sciences · Faculty of Management · Simulation Health Centre Centre · Science Labs · Subway · The Urban Market · Tim Hortons · University of Calgary Faculty of Social

Seldin, Jonathan P.

31

120 Check www.uaf.edu/schedule/ for changes to classes, regulations and fees. Area code is 907. FarmersLoopRoad  

E-Print Network (OSTI)

. TROTH YEDDHA' PARK FarmersLoopRoad West Valley Plaza 4001 Geist Road, Suite 6 - Advancement Services

Wagner, Diane

32

Report on the remedial investigation of Bear Creek Valley at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 2: Appendix A -- Waste sites, source terms, and waste inventory report; Appendix B -- Description of the field activities and report database; Appendix C -- Characterization of hydrogeologic setting report  

SciTech Connect

This Remedial Investigation (RI) Report characterizes the nature and extent of contamination, evaluates the fate and transport of contaminants, and assesses risk to human health and the environment resulting from waste disposal and other US Department of Energy (DOE) operations in Bear Creek Valley (BCV). BCV, which is located within the DOE Oak Ridge Reservation (ORR) encompasses multiple waste units containing hazardous and radioactive wastes arising from operations at the adjacent Oak Ridge Y-12 Plant. The primary waste units discussed in this RI Report are the S-3 Site, Oil Landfarm (OLF), Boneyard/Burnyard (BYBY), Sanitary Landfill 1 (SL 1), and Bear Creek Burial Grounds (BCBG). These waste units, plus the contaminated media resulting from environmental transport of the wastes from these units, are the subject of this RI. This BCV RI Report represents the first major step in the decision-making process for the BCV watershed. The RI results, in concert with the follow-on FS will form the basis for the Proposed Plan and Record of Decision for all BCV sites. This comprehensive decision document process will meet the objectives of the watershed approach for BCV. Appendix A includes descriptions of waste areas and estimates of the current compositions of the wastes. Appendix B contains an extensive database of environmental data for the Bear Creek Valley Characterization Area. Information is also presented about the number and location of samples collected, the analytes examined, and the extent of data validation. Appendix C describes the hydrogeologic conceptual model for Bear Creek Valley. This model is one of the principal components of the conceptual site models for contaminant transport in BCV.

NONE

1996-09-01T23:59:59.000Z

33

Reprint of: Lessons from long-term studies of harvest methods in southwestern ponderosa pineGambel oak forests on the Fort Valley Experimental Forest, Arizona, U.S.A.  

Science Journals Connector (OSTI)

The Fort Valley Experiment Station (now Fort Valley Experimental Forest) has contributed many long-term studies to forest research. This paper focuses on a Methods of Cutting study initiated in 1913 on the Coulter Ranch Unit of Fort Valley and how that long-term study yielded important ecological and management lessons. We quantified the historical and contemporary forest patterns at this ponderosa pineGambel oak site, which was harvested using three different harvesting systems in 1913 (seed tree, group selection, and light selection) and was partially excluded from livestock browsing in 1919. Using nine historically stem-mapped permanent plots for the following three stand structural scenarios: 1913 pre-harvest (modeled), post-harvest (actual), and 20032006 (actual) conditions, we examined the short- and long-term consequences of harvest and livestock grazing land-use and stand dynamics. We assessed changes in spatial pattern under each harvesting system and in each structural scenario, and lastly, we examined spatial and temporal tree recruitment patterns as observed in the contemporary (20032006) conditions. The seed tree harvests effectively converted the spatial patterns from aggregated to random and left few trees, while the group selection and light selection had varying effects, but consistently exaggerated the spatial patchiness of the stand. By 20032006, all plots were aggregated at all scales and were one large patch of predominately small trees. Sites that were harvested, but excluded from livestock browsing had 40% more trees in 20032006. Contemporary recruitment patterns were significantly aggregated under all harvesting systems, but were most strongly aggregated if the site received a group selection or light selection cut. For group and light selection, pine seedlings initially established in stump patches created by harvesting and then proceeded to fill-in the remaining area, with recruitment rarely found under the residual pine or oak trees. Long-term data sets, such as these established by the Fort Valley Experimental Forest in 1913, are essential for quantifying the impact of historical land-use practices on contemporary forest composition and structure. Ignoring land-use legacies may lead to the misinterpretation of stand dynamics and development, and therefore should be explicitly quantified and incorporated into future management and restoration activities.

Andrew J. Snchez Meador; Margaret M. Moore

2011-01-01T23:59:59.000Z

34

Design/Installation and Structural Integrity Assessment of the Bethel Valley Low-Level Waste Collection and Transfer System Upgrade for Building 3544 (Process Waste Treatment Plant) at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

This document describes and assesses planned modifications to be made to the Building 3544 Process Waste Treatment Plant of the Oak Ridge National Laboratory, Oak Ridge, Tennessee. The modifications are made in response to the requirements of the Federal Facility Agreement (FFA) relating to environmental protection requirements for tank systems. The modifications include the provision of a new double contained LLW line replacing an existing buried line that does not provide double containment. This new above ground, double contained pipeline is provided to permit discharge of treated process waste fluid to an outside truck loading station. The new double contained discharge line is provided with leak detection and provisions to remove accumulated liquid. An existing LLW transfer pump, concentrated waste tank, piping and accessories are being utilized, with the addition of a secondary containment system comprised of a dike, a chemically resistant internal coating on the diked area surfaces and operator surveillance on a daily basis for the diked area leak detection. This assessment concludes that the planned modifications comply with applicable requirements of Federal Facility Agreement, Docket No. 89-04-FF, covering the Oak Ridge Reservation.

NONE

1996-12-01T23:59:59.000Z

35

Imperial Valley IMPERIAL VALLEY  

E-Print Network (OSTI)

2013­2014 Bulletin Imperial Valley Campus #12;BULLETIN THE IMPERIAL VALLEY CAMPUS 2013-2014 SAN of the Imperial Valley Campus of San Diego State University. Its publication coincides with the campus' 54 years of providing higher education to the students of Imperial Valley. During this time we have evolved from

Gallo, Linda C.

36

The Oaks  

NLE Websites -- All DOE Office Websites (Extended Search)

Oaks Oaks Nature Bulletin No. 73 July 6, 1946 Forest Preserve District of Cook County Clayton F. Smith, President Roberts Mann, Superintendent of Conservation THE OAKS The oak is celebrated in history and fable. Great forests of oak once covered much of England and central Europe. The ancient Druids held the oak especially sacred and performed their mysterious rites in the depths of the oak forests. Our modern oaks, of which there are more than 275 species distributed over the world -- largely in temperate regions -- are descendants of prehistoric trees. Some 20 or 30 forms have been identified from fossils as existing during the Ice Age. The oaks dominate our upland woods in the Middle West. Of 54 species in the United States, Illinois has 19. Cook County has 9, of which only 6 are common: the white, the swamp white, the bur, the black, the red and Hill's black ( or northern pin oak). Less common are the true pin oak, the shingle oak and the chinquapin.

37

Ed Westcotts photography goes on the road  

NLE Websites -- All DOE Office Websites (Extended Search)

the Manhattan Project by famed local photographer Ed Westcott, is going on the road. The Oak Ridge Secret City Photographic History Exhibit consists of selected images from many...

38

Oak Wilt  

NLE Websites -- All DOE Office Websites (Extended Search)

Oak Wilt Oak Wilt Nature Bulletin No. 479-A February 3, 1973 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation OAK WILT Our sturdy oaks, symbols of strength, toughness and durability, are menaced by a deadly fungous disease called Oak Wilt, They are being attacked in at least 18 states from Minnesota and Kansas to Pennsylvania and North Carolina. That is alarming to those who recall that, during the first 35 years of this century, all but a few of our native chestnuts were annihilated by Chestnut Blight -- a fungus brought here in young chestnuts from Asia. Since 1930, we have lost untold numbers of fine elms and are desperately battling to save the rest from destruction by Dutch elm disease caused by a European fungus. Now the oaks, most important of all our hardwoods, are similarly threatened.

39

The Tradeoffs of Fused Memory Hierarchies in Heterogeneous Computing Architectures  

E-Print Network (OSTI)

Oak Ridge National Laboratory 1 Bethel Valley Road Oak Ridge, TN 37831 kys@ornl.gov Jeremy S. Meredith Oak Ridge National Laboratory 1 Bethel Valley Road Oak Ridge, TN 37831 jsmeredith@ornl.gov Seyong Lee Oak Ridge National Laboratory 1 Bethel Valley Road Oak Ridge, TN 37831 lees2@ornl.gov Dong Li Oak

40

Oak Ridge  

Office of Legacy Management (LM)

~, ~, . ., . .- -. -_ .._ ..-. - .- ..- Oak Ridge Associated post Of%ce Box 117 Uniwx.ities Oak Riie. Tennessee 37631-0117 Apill. 1991 Ms. cethy Hickey Bschtel Nstiod Inc. P. 0. Box 350 Oak Ridge, Tn 378314350 Subject: BLDG. 621-527 - BAKER AND WlLLfAMS WAREHOUSES Deer Ms. Hiikey: 8etween March 1 l-22, 1991, the Envfronmental Suvey and Sine Assessment Program fESSAP1 of Oak Ridge Associated Urtiversities fORALl conducted a radiological charscterization euwey of the East end West besernent bays in Building 521-527 of the Etaker and Williams Warehouses. A review of tha rrurvey resufts indicate that ecthity exceeding criteria is present in four (4) locations in the East bay which will requfre decontamination. Dust samples were coflected from the floor and ledges in tha East bay. Direct measurements

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

OAK FMSXSE  

Office of Legacy Management (LM)

DOE contractors from the Office of Sciitific and Techni- cal Information, P.O. Box 62, Oak Ridge, TN 37831; prices availabte from (423) 5768401. Frs 6264401. Available to the...

42

Design/installation and structural integrity assessment under the Federal Facility Agreement for Bethel Valley low-level waste collection and transfer system upgrade for Building 2026 (High Radiation Level Analytical Laboratory) and Building 2099 (Monitoring and Control Station) at Oak Ridge National Laboratory  

SciTech Connect

This document presents a Design/Installation and Structural Integrity Assessment for a replacement tank system for portions of the Bethel Valley Low-Level Waste (LLW) System, located at the Oak Ridge Reservation, Oak Ridge, Tennessee. This issue of the assessment covers the design aspects of the replacement tank system, and certifies that the design has sufficient structural integrity and is acceptable for the storing or treating of hazardous and/or radioactive substances. This document will be reissued at a future date and will then include the assessment of the installation of the replacement tank system. The present issue identifies specific activities that must be completed during the fabrication, installation, and testing of the replacement tank system in order to provide assurance that the final installation complies with governing requirements.

Not Available

1994-11-01T23:59:59.000Z

43

E-Print Network 3.0 - azapa valley northern Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

H., ed., Goethe, Chaos, and Complexity. Amsterdam: Editions Summary: growing in white oak woodlands on of the hills surrounding the Gobenmatt valley, Switzerland. A....

44

Rift valley  

Science Journals Connector (OSTI)

Valleys of subsidence with long steep parallel walls, as originally defined...J. W. Gregory (1894). rift valleys are evidently the geomorphic equivalents of or...Rift Valley Structure..., Vol. V). Quennell be...

Rhodes W. Fairbridge

1968-01-01T23:59:59.000Z

45

NPP Tropical Forest: Magdalena Valley, Colombia  

NLE Websites -- All DOE Office Websites (Extended Search)

Magdalena Valley, Colombia, 1970-1971 Magdalena Valley, Colombia, 1970-1971 Data Citation Cite this data set as follows: Folster, H. 1999. NPP Tropical Forest: Magdalena Valley, Colombia, 1970-1971. Data set. Available on-line [http://www.daac.ornl.gov] from Oak Ridge National Laboratory Distributed Active Archive Center, Oak Ridge, Tennessee, U.S.A. Description Biomass, litterfall, and nutrient content of above-ground vegetation and soil were determined for a tropical seasonal evergreen forest at Magdalena Valley, Colombia, during an 18-month period in 1970 and 1971. The study was sponsored by the German Research Foundation. Of primary interest were biomass and nutrient dynamics of a forest stand that had developed atop a perched water table on a typical valley terrace. Perched water tables give rise to pseudogley soils with low pH, prolonged

46

Union Valley  

Energy.gov (U.S. Department of Energy (DOE))

This document explains the cleanup activities and any use limitations for the land surrounding Union Valley.

47

Imperial Valley Campus IMPERIAL VALLEY  

E-Print Network (OSTI)

Bulletin Imperial Valley Campus 2012­2013 #12;#12;BULLETIN THE IMPERIAL VALLEY CAMPUS 2012-2013 SAN 2012-2013 It is with great pleasure that we present the 2012- 2013 Bulletin of the Imperial Valley higher education to the students of Imperial Valley. During this time we have evolved from an institution

Gallo, Linda C.

48

Oak Ridge Y-12 and Oak Ridge National Laboratory, Former Production Workers  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Y-12 and Oak Ridge National Laboratory, Former Production Y-12 and Oak Ridge National Laboratory, Former Production Workers Screening Projects Oak Ridge Y-12 and Oak Ridge National Laboratory, Former Production Workers Screening Projects Project Name: Worker Health Protection Program Covered DOE Site: Y-12 and ORNL (X-10) Worker Population Served: Production Workers Principal Investigator: Steven Markowitz, MD Toll-free Telephone: (800) 906-2019 Local Outreach Office: Linda Parker 109 Viking Road Oak Ridge, TN 37830 Website: http://www.worker-health.org/ Former workers at risk from exposures while working at Y-12 and X-10 are offered a free medical screening. This project is carried out by investigators from the Queens College of the City University of New York. This program also offers CT scans for early lung cancer detection to

49

Oak Ridge Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

P.O. Box 2001 Oak Ridge , Tennessee 37831 June 6, 2011 Mr. Ron Murphree, Chair Oak Ridge Site Specific Advisory Board Post Office Box 2001 Oak Ridge, Tennessee 37830 Dear Mr....

50

Oak Ridge O  

NLE Websites -- All DOE Office Websites (Extended Search)

O ffice P.O. Box 2001 Oak Ridge, Tennessee 37831 - November 24, 2008 Oak Ridge Associated Universities Attn: Mr. Ivan Boatner, General Counsel P.O. Box 117 Oak Ridge , Tennessee...

51

Valley evolution  

Science Journals Connector (OSTI)

The long profile of a stream is not identical with that of its valley since the former depends on the loops ... . The stream in its controls all the valley-forming processes although a direct influence is ... f...

Otto Frnzle

1968-01-01T23:59:59.000Z

52

Alpine Valley  

Science Journals Connector (OSTI)

The Alpine Valley (Vallis Alpes) is a great fault ... Alps Mountains. It is about 80 miles long and up to 7 miles wide. It ... runs down most of the center of the valley. Be sure that you show this exceptional...

Don Spain

2009-01-01T23:59:59.000Z

53

Oak Ridge Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2010 Mr. Ron Murphree, Chair Oak Ridge Site Specific Advisory Board Post Office Box 200 1 Oak Ridge, Tennessee 37830 Dear Mr. Murphree: IN RESPONSE TO RECOMMENDATION 189:...

54

Oak Ridge Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2010 Mr. Ron Murphree, Chair Oak Ridge Site Specific Advisory Board Post Office Box 2001 Oak Ridge, Tennessee 37830 Dear Mr. Murphree: RECOMMENDATION 191: RECOMMENDATION...

55

Oak Ridge Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2010 Mr. Ron Murphree, Chair Oak Ridge Site Specific Advisory Board Post Office Box 200 1 Oak Ridge, Tennessee 37830 Dear Mr. Murphree: IN RESPONSE TO RECOMMENDATION 187:...

56

Oak Ridge Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- June 10, 2009 Mr. Steve Dixon, Chairman Oak Ridge Site Specific Advisory Board Post Office Box 2001 Oak Ridge, Tennessee 37830 Dear Mr. Dixon: RESPONSE TO RECOMMENDATIONS...

57

OAK RIDGE  

Office of Legacy Management (LM)

or or _^ *ORNL/RASA-89/1 I : OAK RIDGE _NATIONAL LABORATORY |*H~~~~~ -~~Results of the I'I-------_____ ~ Preliminary Radiological * "~ i, .irri uSurvey at B&T Metals, _" 425 West Town Street, i * !' V Columbus, Ohio (C0001) I i. U Wo. 0aa-. r m ~~~~~~~~~ if? _ ~ W. D. Cottrell J. L Quillen J. W. Crutcher , I OPERATED BY MARTIN MARIETTA ENERGY SYSTEMS, INC. FOR THE UNITED STATES DEPARTMENT OF ENERGY ORNL/RASA-89/1 3*1~~ ~HEALTH AND SAFETY RESEARCH DIVISION Waste Management Research and Development Programs (Activity No. AH 10 05 00 0; NEAH001) ~I ~RESULTS OF THE PRELIMINARY RADIOLOGICAL SURVEY AT B&T METALS, 425 WEST TOWN STREET. COLUMBUS, OHIO (C0001) 1~~ ~~~~I ~W. D. Cottrell, J. L Quillen,' and J. W. Crutcher ~~~~~~~I ~Date Published - October 1990 «~~I*~ ~~~~~~~ Investigation Team

58

Negative correlation does not imply a tradeoff between growth and reproduction in California oaks  

E-Print Network (OSTI)

of Vertebrate Zoology, University of California at Berkeley, 38601 East Carmel Valley Road, Carmel Valley, CA 93924; and §145 Eldridge Avenue, Mill Valley, CA 94941 Edited by James H. Brown, University of New to be much more important in the life-history evolution of these long-lived plants. We also conclude

Minnesota, University of

59

Design/installation and structural integrity assessment under the Federal Facility Agreement for Bethel Valley Low-Level Waste Collection and Transfer System upgrade for Building 2026 (High Radiation Level Analytical Laboratory) and Building 2099 (Monitoring and Control Station) at Oak Ridge National Laboratory  

SciTech Connect

This document presents a Design/Installation and Structural Integrity Assessment for a replacement tank system for portions of the Bethel Valley Low Level Waste (LLW) System, located at the Oak Ridge Reservation, Oak Ridge, Tennessee. This issue of the assessment covers the design aspects of the replacement tank system, and certifies that the design has sufficient structural integrity and is acceptable for the storing or treating of hazardous and/or radioactive substances. The present issue identifies specific activities that must be completed during the fabrication, installation, and testing of the replacement tank system in order to provide assurance that the final installation complies with governing requirements. Portions of the LLW system are several decades old, or older, and do not comply with current environmental protection regulations. Several subsystems of the LLW system have been designated to receive a state-of-the-art replacement and refurbishment. One such subsystem serves Building 2026, the High Radiation Level Analytical Laboratory. This assessment focuses on the scope of work for the Building 2026 replacement LLW Collection and Transfer System, including the provision of a new Monitoring and Control Station (Building 2099) to receive, store, and treat (adjust pH) low level radioactive waste.

Not Available

1994-10-01T23:59:59.000Z

60

Sheila I. Smith 117 Phillips Road (518) 301-5158  

E-Print Network (OSTI)

Sheila I. Smith 117 Phillips Road (518) 301-5158 Valley Falls, NY, 12185 ssmith4@albany.edu DOB: 12 for Excellence in Nanotechnology (4-year) ­ Spring 2010 Publications Rajan Kumar, Sheila Smith, James Mc

Daly, Samantha

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Oak Ridge Ofice  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge Ofice Oak Ridge Ofice P.O. Box 2001 Oak Ridge, Tennessee 37831 January 30, 2013 MEMORANDUM FOR GREGORY H. WOODS GENERAL COUNSEL, GC-1, HQFORS FROM: LARRY C. KEL MANAGER SUBJECT: ANNUAL NATIONAL ENVIRONMENTAL POLICY ACT PLANNING SUMMARY ·FOR 2013- OAK RIDGE OFFICE This correspondence responds to the request for the Annual National Environmental Policy Act (NEPA) Planning Summary for 2013 for the Oak Ridge Office (ORO). This is in accordance with

62

Oak Ridge National Laboratory | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge National Laboratory Oak Ridge National Laboratory Oak Ridge National Laboratory | April 2013 Aerial View Oak Ridge National Laboratory | April 2013 Aerial View Oak Ridge...

63

Design/installation and structural integrity assessment of Bethel Valley low-level waste collection and transfer system upgrade for Building 3092 (Central Off-Gas Scrubber Facility) at Oak Ridge National Laboratory  

SciTech Connect

This document describes and assesses planned modifications to be made to the Building 3092 Central Off-Gas Scrubber Facility of the Oak Ridge National Laboratory, Oak Ridge, Tennessee. The modifications are made in responsible to the requirements of 40CFR264 Subpart J, relating to environmental protection requirements for buried tank systems. The modifications include the provision of a new scrubber recirculation tank in a new, below ground, lines concrete vault, replacing and existing recirculation sump that does not provide double containment. A new buried, double contained pipeline is provided to permit discharge of spent scrubber recirculation fluid to the Central Waste Collection Header. The new vault, tank, and discharge line are provided with leak detection and provisions to remove accumulated liquid. New scrubber recirculation pumps, piping, and accessories are also provided. This assessment concludes that the planned modifications comply with applicable requirements of 40CFR264 Subpart J, as set forth in Appendix F to the Federal Facility Agreement, Docket No. 89-04-FF, covering the Oak Ridge Reservation.

NONE

1995-01-01T23:59:59.000Z

64

Field Of?b, Oak Rldge  

Office of Legacy Management (LM)

Field Of?b, Oak Rldge Field Of?b, Oak Rldge P.O. Box 2001 Oak Ridge, Tennes~e 37831- 8723 April 20, 1993 Dr. Paul Merges Chief, Bureau of Radiation New York State Department of Environmental Conservation 50 Yolf Road Room 506 Albany, New York 12233-7255 Dear Dr. Merges: BAKER AND NILLIANS WRMOUSES SITE - CORPLETION OF CLEANUP ACTI(rIT1ES The purpose of this notice is to inform you about further scheduled cleanup activities to be conducted by the Department of Energy (DDE) at 513-519 West 20th Street In New York, New York. This property is one of three buildings that make up the site of the former Baker and Williams warehouses. Final remediation of this site by DDE is scheduled for flay and June 1993. I have enclosed for your Information a sumnary fact sheet describing these

65

Oak Ridge Advantages  

NLE Websites -- All DOE Office Websites (Extended Search)

Oak Ridge Advantages Our Locational Advantage Oak Ridge, Tennessee is within a day's drive of 70% of the population of the continental United States. Each of CROET's industrial and...

66

Oak Ridge Operations.  

Office of Legacy Management (LM)

4s - 22 Department of Energy Oak Ridge Operations. SI9J>liB P.O. Box 2001 Oak Ridge. Tennessee 37831-8723 October 21, 1994 Mr. Charles A. Duritsa Regional Director...

67

Oak Ridge Office  

Office of Environmental Management (EM)

Martin , Chair Oak Ridge Site Specific Advisory Board Post Office Box 200 I Oak Ridge, Tennessee 37831 Dear Mr. Martin : May 22, 2013 RESPONSE TO YOUR LETTER DATED MAY 9, 2013,...

68

Oak Ridge Office  

Office of Environmental Management (EM)

Hemelright, Acting Chair Oak Ridge Site Specific Advisory Board Post Office Box 2001 Oak Ridge, Tennessee 37831 Dear Mr. Hemel right: July 19, 2013 RESPONSE TO YOUR LETTER DATED...

69

Oak Ridge Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2010 Mr. Ron Murphree, Chair Oak Ridge Site Specific Advisory Board Post Office Box 200 1 Oak Ridge, Tennessee 3783 1 Dear Mr. Murphree: RESPONSE TO BOARD RECOMMENDATION 188 ON...

70

West Valley Demonstration Project Waste Management Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WEST VALLEY DEMONSTRATION PROJECT WEST VALLEY DEMONSTRATION PROJECT WASTE MANAGEMENT ENVIRONMENTAL IMPACT STATEMENT FINAL SUMMARY December 2003 Prepared by: U.S. Department of Energy West Valley Area Office West Valley, NY DOE/EIS - 0337F For general questions or to request a copy of this EIS, please contact: DANIEL W. SULLIVAN, DOCUMENT MANAGER DOE WEST VALLEY AREA OFFICE 10282 Rock Springs Road WEST VALLEY, NY 14171-0191 1-800-633-5280 COVER SHEET Lead Agency: U.S. Department of Energy Title: Final West Valley Demonstration Project Waste Management Environmental Impact Statement, Cattaraugus County, West Valley, New York. Contact: For further information about this Environmental Impact Statement, contact: For general information on the Department of Energy's process for implementing the National

71

Oak Ridge | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge Oak Ridge Oak Ridge Oak Ridge's compliance agreements - which help support the development of effective compliance approaches and strategies - are listed below. Summaries of the agreements also are included. Oak Ridge Reservation Compliance Order, September 26, 1995 Oak Ridge Reservation Compliance Order, September 26, 1995 Summary Federal Facility Agreement for the Oak Ridge Reservation, January 1, 1992 Federal Facility Agreement for the Oak Ridge Reservation, January 1, 1992 Summary The Oak Ridge Reservation PCB Federal Facilities Compliance Agreement, October 28, 1996 The Oak Ridge Reservation PCB Federal Facilities Compliance Agreement, October 28, 1996 Summary Weldon Spring Federal Facility Agreement, January 28, 1992 Weldon Spring Federal Facility Agreement, January 28, 1992 Summary

72

Oak Ridge Associated Universities Procurement Questionnaire Applicatio...  

Office of Environmental Management (EM)

Oak Ridge Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities Procurement...

73

Table S1. Values for density (trees/ha) and percent stocking (Stock) for the Missouri, US, Ozarks. Due to lack of a stocking chart for oaks in floodplain forests, stocking may be overestimated for some floodplain forests.  

E-Print Network (OSTI)

Oak Woodland/Forest Hills floodplains 476 218 673 189 87 267 Floodplain Forests OZ14 Oak-Pine Hills floodplains 252 124 340 111 55 150 Floodplain Forests OZ9 Oak-Pine Hills floodplains 136 64 189 48 23 67 Oak Woodland/Forest Hills valleys/toe slopes 228 146 266 65 42 76 Forest OZ5 Oak Woodland/Forest Hills

Sprott, Julien Clinton

74

Oak Ridge National Laboratory | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Oak Ridge National Laboratory Oak Ridge National Laboratory An aerial view of the Oak Ridge National Laboratory campus. An aerial view of the Oak Ridge National Laboratory campus....

75

Oak Ridge Associated Llniversities  

Office of Legacy Management (LM)

iifil Prepared by Oak Ridge Associated Llniversities Prepared for U.S. Nuclear Regulatory Commission's Region I Office Supported by Safeguards dnd Materials Program Branch;...

76

Oak Ridge Associated Universities  

NLE Websites -- All DOE Office Websites (Extended Search)

BIBLIOGRAPHY Partnerships for Innovation Oak Ridge Associated Universities (ORAU) is a university consortium leveraging the scientific strength of major research institutions to...

77

WINDERMERE RD WesternRoadWesternRoad  

E-Print Network (OSTI)

WINDERMERE RD N 2 210 Kilometres 186 189 194 WesternRoadWesternRoad Oxford Street Oxford Street 2 2 Street (9 kms) · Turn left (west) onto Oxford Street and follow to Wharncliffe Road (4 kms) · Turn right (north) onto Wharncliffe Road and follow to the fifth set of traffic lights · Turn left (west

Sinnamon, Gordon J.

78

Oak Ridge National Laboratory DOE Oak Ridge Environmental Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Laboratory DOE Oak Ridge Environmental Management Program Background The U.S. Department of Energy's (DOE) Oak Ridge Reservation includes several contaminated areas that...

79

cityOakRidgeWeb  

NLE Websites -- All DOE Office Websites (Extended Search)

& TECHNICAL INFORMATION Oak Ridge Marina Centennial Golf Course Oak Ridge Memorial Park Swimming Pool 11 10 9 9 8 6 7 5 4 3 2 1 701 Scarboro To OAK RIDGE NATIONAL LABORATORY To...

80

Application of Oak Ridge Inorganic Membrane  

NLE Websites -- All DOE Office Websites (Extended Search)

Oak Ridge Inorganic Membrane Oak Ridge Inorganic Membrane Technology to Cat Cracker Recycle Gas Hydrogen* FINAL REPORT DOE FEW FEAC324 June 2003 L.D. Trowbridge *AKA: Application of Inorganic Membrane Technology to Hydrogen-Hydrocarbon Separations ORNL/TM-2003/139 Application of Inorganic Membrane Technology To Hydrogen-hydrocarbon Separations June 2003 Prepared by L. D. Trowbridge DOCUMENT AVAILABILITY Reports produced after January 1, 1996, are generally available free via the U.S. Department of Energy (DOE) Information Bridge: Web site: http://www.osti.gov/bridge Reports produced before January 1, 1996, may be purchased by members of the public from the following source: National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Telephone: 703-605-6000 (1-800-553-6847)

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Oak Ridge | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ridge Ridge Oak Ridge Oak Ridge's compliance agreements - which help support the development of effective compliance approaches and strategies - are listed below. Summaries of the agreements also are included. Oak Ridge Reservation Compliance Order, September 26, 1995 Oak Ridge Reservation Compliance Order, September 26, 1995 Summary Federal Facility Agreement for the Oak Ridge Reservation, January 1, 1992 Federal Facility Agreement for the Oak Ridge Reservation, January 1, 1992 Summary The Oak Ridge Reservation PCB Federal Facilities Compliance Agreement, October 28, 1996 The Oak Ridge Reservation PCB Federal Facilities Compliance Agreement, October 28, 1996 Summary Weldon Spring Federal Facility Agreement, January 28, 1992 Weldon Spring Federal Facility Agreement, January 28, 1992 Summary

82

with Oak Ridge National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

2 Mechanisms for Partnering with Oak Ridge National Laboratory Partnerships-It's our name, but it also represents our driving philosophy and commitment. Oak Ridge National...

83

Lighthouse Solar Diablo Valley | Open Energy Information  

Open Energy Info (EERE)

Valley Valley Jump to: navigation, search Logo: Lighthouse Solar Diablo Valley Name Lighthouse Solar Diablo Valley Address 2420 Sand Creek Road - C1308 Place Brentwood, CA Zip 94513 Sector Solar Phone number (925) 420-5121 Website http://www.lighthousesolar.com Coordinates 37.9434593°, -121.738203° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.9434593,"lon":-121.738203,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

84

Lighthouse Solar Indian Valley | Open Energy Information  

Open Energy Info (EERE)

Valley Valley Jump to: navigation, search Logo: Lighthouse Solar Indian Valley Name Lighthouse Solar Indian Valley Address 5062 McLean Station Road Place Green Lane, PA Zip 18054 Sector Solar Phone number (215) 541-5464 Website http://www.lighthousesolar.com Coordinates 40.350689°, -75.475961° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.350689,"lon":-75.475961,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

85

The Bur Oak  

NLE Websites -- All DOE Office Websites (Extended Search)

Bur Oak Bur Oak Nature Bulletin No. 708 March 9, 1963 Forest Preserve District of Cook County Seymour Simon. President Roberts Mann, Conservation Editor THE BUR OAK The state tree of Illinois is the "native oak". It should be the Bur Oak. As Aldo Leopold discerned: "When school children vote on a state bird, flower, or tree, they are not making a decision; they are merely ratifying history". Ergo, when the first settlers gazed westward across the vast prairies of Illinois, bur oaks were the burly trees on knolls and ridges which stood like ships in a sea of grass. Those oak openings, as they are called, were remarkable features of the tall grass prairies in Indiana, Illinois, and the prairie peninsulas that extended northward into Michigan and Wisconsin. Many early travelers wrote lyrical descriptions of those park-like openings "without a twig of underbrush". . . "where deer grazed leisurely like sheep"...."so open that a cabriolet could have been driven through them for miles".

86

Oak Ridge Reservation Annual Site  

E-Print Network (OSTI)

Oak Ridge Reservation Annual Site Environmental Report DOE/ORO/2445 2012 #12;Cover Image Jeff Riggs Logistical Services Design Creative Media Communications Oak Ridge National Laboratory Oak Ridge Reservation Annual Site Environmental Report 2012 #12;DOE/ORO/2445 Oak Ridge Reservation Annual Site Environmental

Pennycook, Steve

87

Oak Ridge via State Route  

E-Print Network (OSTI)

Knoxville Nashville Oak Ridge via State Route 162 North OAK RIDGE INN & SUITES THE RIDGE INN. TRANSFER SNS PROJECT OFFICE COMMERCE PARK OAK RIDGE/KNOXVILLE ROUTE MAP A B C D E F G H I J K L M N O P Q R CIVIC COLISEUM UT MAIN CAMPUS UT AGRICULTURAL CAMPUS KNOXVILLE LEGEND OAK RIDGE LEGEND To Chattanooga (I

Pennycook, Steve

88

Oak Ridge Reservation Annual Site  

E-Print Network (OSTI)

Oak Ridge Reservation Annual Site Environmental Report DOE/ORO-2473 2013 #12;Cover Image & Design Creative Media Communications Oak Ridge National Laboratory Oak Ridge Reservation Annual Site Environmental Report 2013 #12;DOE/ORO/2473 Oak Ridge Reservation Annual Site Environmental Report for 2013 on the World

Pennycook, Steve

89

Oak Ridge partners: Global security and fuel development | Y-12 National  

NLE Websites -- All DOE Office Websites (Extended Search)

Oak Ridge partners: Global ... Oak Ridge partners: Global ... Oak Ridge partners: Global security and fuel development Posted: July 18, 2012 - 10:00am | Y-12 Report | Volume 9, Issue 1 | 2012 Additive manufacturing builds metal parts, layer by layer, such as this titanium piece ORNL fabricated for Y-12. Y-12 is evaluating the technology for tooling and manufacturing applications. In 2011 the two DOE facilities shared 178 projects worth $12.5 million. In the 1940s Bear Creek and Bethel valleys cradled newly constructed facilities filled with people on a common mission that ended World War II. Today, the Y-12 National Security Complex and Oak Ridge National Laboratory thrive in those transformed valleys and collaborate daily. In 2011 they shared 178 projects worth $12.5 million. "With just a few miles separating our nationally renowned institutions,

90

Ridge and valley topography  

Science Journals Connector (OSTI)

Viewed empirically, the ridge and valley province is a lowland (an assemblage of valley floors) surmounted by long, narrow, even-topped mountain ridges. Either ... the lowlands are disconnected or absent. The valley

Rhodes W. Fairbridge

1968-01-01T23:59:59.000Z

91

Oak Ridge Cleanup Areas  

Energy.gov (U.S. Department of Energy (DOE))

On November 21, 1989, the Environmental Protection Agency placed the Department of Energys Oak Ridge site on its National Prioritization List (NPL).The list names national priorities where there...

92

Operating Oak Ridge's "Calutrons"  

NLE Websites -- All DOE Office Websites (Extended Search)

RIDGE'S CALUTRONS: In this oral history, Theodore Rockwell talks about the Y-12 plant at Oak Ridge where the calutrons were operated by young women, many just out of high school....

93

Oak Ridge Operations YTO  

Office of Legacy Management (LM)

ed States Government Department of Energy Oak Ridge Operations YTO r , , EM-93:Hartman I - CATEGORICAL EXCLUSION (CX) DETERMINATION - RMOVAL ACTION AT M E SPRINGDALE r SITE I -a...

94

Oak Ridge Associ Universities  

Office of Legacy Management (LM)

ir. "'t-"' , i 'Prepared by Oak Ridge Associ Universities Prepared for Division of Remedial Action Proiects 'U.S. Department of Energy 5 : l :;"i r l ,iri, t . r ' i , , . 1...

95

OAK RIDGE NATIONAL LABORATORY  

Office of Legacy Management (LM)

Pennsylvania The Measurement l i c a t i o n s and Development Group of the Oak Ridge National Laborator? served as the Independent Verification Contractor for the...

96

Remedial investigation work plan for Bear Creek Valley Operable Unit 1 (S-3 Ponds, Boneyard/Burnyard, Oil Landfarm, Sanitary Landfill 1, and the Burial Grounds, including Oil Retention Ponds 1 and 2) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1, Main text  

SciTech Connect

The intent and scope of the work plan are to assemble all data necessary to facilitate selection of remediation alternatives for the sites in Bear Creek Valley Operable Unit 1 (BCV OU 1) such that the risk to human health and the environment is reduced to acceptable levels based on agreements with regulators. The ultimate goal is to develop a final Record Of Decision (ROD) for all of the OUs in BCV, including the integrator OU. However, the initial aim of the source OUs is to develop a ROD for interim measures. For source OUs such as BCV OU 1, data acquisition will not be carried out in a single event, but will be carried out in three stages that accommodate the schedule for developing a ROD for interim measures and the final site-wide ROD. The three stages are as follows: Stage 1, Assemble sufficient data to support decisions such as the need for removal actions, whether to continue with the remedial investigation (RI) process, or whether no further action is required. If the decision is made to continue the RI/FS process, then: Stage 2, Assemble sufficient data to allow for a ROD for interim measures that reduce risks to the human health and the environment. Stage 3, Provide input from the source OU that allows a final ROD to be issued for all OUs in the BCV hydrologic regime. One goal of the RI work plan will be to ensure that sampling operations required for the initial stage are not repeated at later stages. The overall goals of this RI are to define the nature and extent of contamination so that the impact of leachate, surface water runoff, and sediment from the OU I sites on the integrator OU can be evaluated, the risk to human health and the environment can be defined, and the general physical characteristics of the subsurface can be determined such that remedial alternatives can be screened.

Not Available

1993-09-01T23:59:59.000Z

97

Independent Oversight Inspection, Oak Ridge National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 Independent Oversight Inspection, Oak Ridge National Laboratory - October 2005 October 2005 Inspection of Emergency Management at the Oak Ridge Office and the Oak Ridge National...

98

2014 House Nuclear Cleanup Caucus Oak Ridge  

Office of Environmental Management (EM)

2014 House Nuclear Cleanup Caucus Oak Ridge August 16, 2014 Sue Cange Acting Manager Oak Ridge Office of Environmental Management Oak Ridge Site Specific Advisory Board Annual...

99

Independent Oversight Inspection, Oak Ridge National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge National Laboratory - October 2008 Independent Oversight Inspection, Oak Ridge National Laboratory - October 2008 October 2008 Inspection of Nuclear Safety at the Oak...

100

Oversight Reports - Oak Ridge National Laboratory | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge National Laboratory Oversight Reports - Oak Ridge National Laboratory April 24, 2014 Independent Oversight Targeted Review, Oak Ridge National Laboratory - April 2014...

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Murdock Road Knoxville.TN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

702 702 Murdock Road Knoxville.TN 37932 Tel: (609) 921-1456 Fax: (609) 92 1-8703 AA\W.nell-one.com March 25,2009 Office of the Assistant General Counsel for Technology Transfer and Intellectual Property U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Attn: Technology Transfer Questions Subject: Questions Concerning Technology Transfer Practices at DOE Laboratories (Federal RegisterNol. 73, No. 229/ November 26,2008 /Notices) Dear Mr. Gottlieb, Thank you for the opportunity to respond to the questions published in the Federal Register. As Chief Executive Officer of Nell One Therapeutics, a spin-out company which is in the process of licensing technology from Oak Ridge National Laboratory (ORNL), I found the questions to be highly relevant to our experiences. While many great technologies and capabilities reside in the National Laboratories

102

East Avenue Truck Inspection Patterson Pass Road Vasco Road  

NLE Websites -- All DOE Office Websites (Extended Search)

Vasco Road Thunderbird Lane Greenville Road Greenville Road Directions to the SandiaCA - Visitor Badge Office Interstate 580 - OaklandSan Francisco, Traveling Eastbound * Exit...

103

West Valley Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE))

West Valley Demonstration Project compliance agreements, along with summaries of the agreements, can be viewed here.

104

Imperial Valley Campus Bulletin  

E-Print Network (OSTI)

Imperial Valley Campus Bulletin 2011­2012 #12;#12;BULLETIN THE IMPERIAL VALLEY CAMPUS 2011-2012 SAN 2011-2012 It is with great pleasure that we present the 2011- 2012 Bulletin of the Imperial Valley higher education to the students of Imperial Valley. During this time we have evolved from an institution

Gallo, Linda C.

105

West Valley  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Facility Nuclear Facility Coalition on West Valley Nuclear Wastes PO Box 603 Springville NY 14141 WV-DigItUp@roadrunner.com Joanne Hameister CFMT (Concentrator Feed Make-up Tank) Packaged 13'x14'x19' 177.5 tons MFHT (Melter Feed Hold Tank) Packaged 13'x14'x16' 152.5 tons WIR Shipments pending to LLW facility MELTER 10'x10'x10' Packaged: 14'x13'x13' 159 tons 4,570 Curies Waste Categories High-Level Waste Based on source * Nuclear Fuel * Reprocessing * TRU Low-Level Waste Not Low Risk Complex classification based on * Nuclide inventory * Half-life(s) * Quantity * Decay products Background Radiation 1978 - average was 100 mRem per person 2011 - BRC* estimate 620 mRem per person Naturally occurring radioactive elements Additions accumulate - from fall-out,

106

West Valley  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Facility Nuclear Facility Coalition on West Valley Nuclear Wastes PO Box 603 Springville NY 14141 WV-DigItUp@roadrunner.com Joanne Hameister CFMT (Concentrator Feed Make-up Tank) Packaged 13'x14'x19' 177.5 tons MFHT (Melter Feed Hold Tank) Packaged 13'x14'x16' 152.5 tons WIR Shipments pending to LLW facility MELTER 10'x10'x10' Packaged: 14'x13'x13' 159 tons 4,570 Curies Waste Categories High-Level Waste Based on source * Nuclear Fuel * Reprocessing * TRU Low-Level Waste Not Low Risk Complex classification based on * Nuclide inventory * Half-life(s) * Quantity * Decay products Background Radiation 1978 - average was 100 mRem per person 2011 - BRC* estimate 620 mRem per person Naturally occurring radioactive elements Additions accumulate - from fall-out,

107

Photo of the Week: RoHAWKtics at Oak Ridge National Laboratory | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RoHAWKtics at Oak Ridge National Laboratory RoHAWKtics at Oak Ridge National Laboratory Photo of the Week: RoHAWKtics at Oak Ridge National Laboratory April 1, 2013 - 3:40pm Addthis Tennessee Governor Bill Haslam signs the robot of Hardin Valley Academy's FIRST robotics team during the dedication of DOE's Carbon Fiber Technology Facility, located at Oak Ridge National Laboratory. The RoHAWKtics team (named after their school mascot) spent an intense six weeks constructing the robot, using design, engineering, and problem-solving skills. The team will be moving on to a national competition in April. Learn more about the FIRST competition. | Photo courtesy of Oak Ridge National Laboratory.

108

Photo of the Week: RoHAWKtics at Oak Ridge National Laboratory | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RoHAWKtics at Oak Ridge National Laboratory RoHAWKtics at Oak Ridge National Laboratory Photo of the Week: RoHAWKtics at Oak Ridge National Laboratory April 1, 2013 - 3:40pm Addthis Tennessee Governor Bill Haslam signs the robot of Hardin Valley Academy's FIRST robotics team during the dedication of DOE's Carbon Fiber Technology Facility, located at Oak Ridge National Laboratory. The RoHAWKtics team (named after their school mascot) spent an intense six weeks constructing the robot, using design, engineering, and problem-solving skills. The team will be moving on to a national competition in April. Learn more about the FIRST competition. | Photo courtesy of Oak Ridge National Laboratory.

109

Oak Ridge Associated Universities  

Office of Legacy Management (LM)

the the Office of Environmental Restoration U.S. Department of Energy RADIOLOGICAL SURVEY OF THE FORMER BLISS AND LAUGHLIN STEEL COMPANY FACILITY BUFFALO, NEW YORK J. D. BERGER Environmental Survey and Site Assessment Program Energy/Environment Systems Division DRAFT REPORT APRIL 1992 c -. ..". FlLS\COPY x_.. --. RADIOLOGICAL SURVEY OF THE FORMER BLISS AND LAUGHLIN STEEL COMPANY FACILITY 110 HOPKINS STREET BUFFALO, NEW YORK Prepared by J. D. Berger Environmental Survey and Site Assessment Program Energy/Environmental Systems Division Oak Ridge Associated Universities/Oak Ridge Institute for Science and Education Oak Ridge, Tennessee 37831-0117 Project Staff R. D. Condra D. A. Gibson M. J. Laudernan R. B. Slaten Prepared for Department of Energy

110

Oak Ridge Office  

NLE Websites -- All DOE Office Websites (Extended Search)

P.O. Box 2001 P.O. Box 2001 Oak Ridge, Tennessee 37831 - August 28, 2008 Oak Ridge Associated Universities Attn : Mr. Ivan Boatner, General Counsel P.O. Box 117 Oak Ridge, Tennessee 37831 Dear Mr. Boatner: SUBJECT: CONTRACT NO. DE-AC05-060R231 00, MODIFICATION A050 Enclosed is one fully executed copy of the subject document. This modification obligates the sum of $25,539,179.05, resulting in total obligations to this contract of $541 ,282,961.6 1. If you have any queslions regarding this action, you may contact me at 576-0757 or via e-mail at ahlersdd@oro.doe.qov. Enclosure Darlene D. Ahlers Contract Specialist Procurement and Contracts Division ® PRINTED ON REC'1CLEO PAPER AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT 10 CODE 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 1

111

Oak Ridge Associated  

Office of Legacy Management (LM)

])\D ])\D Oak Ridge ,.(\\~ Associated ru~ Universities Post Office Box 11 7 Oak Ridge, Tennessee 37831-0117 October 21, 1986 Manpower Education, Research, and Training Division Mr. Edward G. Delaney, Director Division of Facility and Site Decommissioning Projects Office of Nuclear Energy U.S. Department of Energy Washington, DC 20545 Subject: VERIFICATION OF NIAGARA FALLS STORAGE SITE VICINITY PROPERTIES - 1983/1984 REMEDIAL ACTIONS Dear Mr. Delaney: Oak Ridge Associated Universities

112

Contact OAK RIDGE NATIONAL LABORATORY  

NLE Websites -- All DOE Office Websites (Extended Search)

Contact OAK RIDGE NATIONAL LABORATORY ORNL is managed by UT-Battelle for the US Department of Energy Solving the big problems Oak Ridge National Laboratory is the largest US...

113

DOE Oak Ridge Operations managers  

NLE Websites -- All DOE Office Websites (Extended Search)

Oak Ridge Operations managers As the last few articles have shown, the period immediately following the end of World War II was one of constant and continuing change for Oak Ridge....

114

Oak Ridge National Laboratory Site Office CX Determinations | U.S. DOE  

NLE Websites -- All DOE Office Websites (Extended Search)

Oak Ridge National Laboratory Site Office Oak Ridge National Laboratory Site Office CX Determinations Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act Categorical Exclusion Determinations Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Larry Kelly U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-0885 Categorical Exclusion (CX) Determinations Oak Ridge National Laboratory Site Office CX Determinations Print Text Size: A A A RSS Feeds FeedbackShare Page Categorical Exclusion Determination Documents (CX Determinations): * Determination Date Name of Action: Description Categorical Exclusion Number External link 12/11/2013 Demolition and Replacement of Building 7018 at the Oak Ridge National Laboratory (3790CXD) .pdf file (100KB) B1.15; B1.23

115

U.S. Department of Energy Oak Ridge Operations Offlce Procurement and Cantrads Division  

National Nuclear Security Administration (NNSA)

Oak Ridge Operations Offlce Oak Ridge Operations Offlce Procurement and Cantrads Division P.O. BOX 2001 Oak Ridge. TN 37831 SOLICITATION, OFFER AND AWARD Dlrect Del very Adotess' U S Deoanmenl of Energy Oar R doe Ooerat ons Ofice ~ r m u r e i e n t s n d Contracts Division ,200 Administration Road, ATTN: Ballard A. Jackson Jr Oak Ridse. TN 37830 I . THIS CONTRACT IS ARATED ORDER UNDER DPAS (15 CFR 700) I NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder". SOLICITATION 9. Sealed offers in original and S e e Section L copies for furnishing the supplies or selvices in the Schedule will b e received at the place specified in I t e m % or if handcarried, in the depository located i n the Federal Office Buildinq a t Oak Ridqe. T

116

ROBERT BROWN DEPUTY MANAGER, OAK RIDGE OFFICE  

E-Print Network (OSTI)

ROBERT BROWN DEPUTY MANAGER, OAK RIDGE OFFICE AUGUST 24, 2010 OVERVIEW OF THE UNITED STATES DEPARTMENT OF ENERGY OAK RIDGE OFFICE #12;( 2 ) KEY OAK RIDGE MISSIONS Oak Ridge Office · Science CONTRACTORS Oak Ridge National Laboratory Oak Ridge Institute for Science and Education Office of Scientific

117

Oak Ridge via State Route  

E-Print Network (OSTI)

Knoxville Nashville Oak Ridge via State Route 162 North STAYBRIDGE SUITES THE VISTA INN PROJECT OFFICE COMMERCE PARK OAK RIDGE/KNOXVILLE DETAILED ROUTE MAP A B C D E F G H I J K L M N O P Q R PARK (FORMERLY K-25 PLANT) OAK RIDGE NATIONAL LABORATORY (X-10) Y-12 NATIONAL SECURITY COMPLEX 1 2 SNS

118

Forest Roads (Minnesota)  

Energy.gov (U.S. Department of Energy (DOE))

Proposed forest roads must be approved and designated by the Commissioner of the Department of Natural Resources.

119

Scott Stadium Stadium Road  

E-Print Network (OSTI)

Scott Stadium Stadium Road Residence Hereford College Alderman Road Residence Area Aquatic Increase Service to the Corner I0 750 1,500375 Feet Coordinate System: NAD 1983 StatePlane Virginia South 2: 36.7667 Latitude Of Origin: 36.3333 Units: Foot US #12;Scott Stadium Stadium Road Residence

Acton, Scott

120

Early Oak Ridge Trailer Homes | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

Early Oak Ridge Trailer ... Early Oak Ridge Trailer Homes A row of trailer homes used in early Oak Ridge...

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Valley Network (Venus)  

Science Journals Connector (OSTI)

Labyrinthic valley network (Fig. 1...). This is the most common type observed on Venus. Valleys are several km wide and 100 s km long. They are found within or near tectonically...1992, 1993, 2001...). Their morp...

Goro Komatsu

2014-06-01T23:59:59.000Z

122

Melton Valley Watershed  

Energy.gov (U.S. Department of Energy (DOE))

This document explains the cleanup activities and any use limitations for the land surrounding the Melton Valley Watershed.

123

Bear Creek Valley Watershed  

Energy.gov (U.S. Department of Energy (DOE))

This document explains the cleanup activities and any use limitations for the land surrounding the Bear Creek Valley Watershed.

124

Bethel Valley Watershed  

Energy.gov (U.S. Department of Energy (DOE))

This document explains the cleanup activities and any use limitations for the land surrounding the Bethel Valley Watershed.

125

Oak Ridge Office  

NLE Websites -- All DOE Office Websites (Extended Search)

October 31, 2008 October 31, 2008 Oak Ridge Associated Universities Attn : Mr. Ivan Boatner, General Counsel P.O. Box 117 Oak Ridge, Tennessee 37831 Dear Mr. Boatner: SUBJECT: CONTRACT NO. DE-AC05-060R23100, MODIFICATION A054 Enclosed is one fully executed copy of the subject document. This modification obligates the sum of $10,799,1 39.34, resulting in total obligations to this contract of $585,758,575.72. If you have any questions regarding this action, you may contact me at 576-0757 or via e-mail at ahlersdd@oro.doe .qov . Enclosure Darlene D. Ahlers Contract Specialist Procurement and Contracts Division ® PRINTED ON RECYCLED PAPER AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE I PAGE OF PAGES 1 I 1 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITIONIPURCHASE REQ. NO. I 5. PROJECT NO. (If applicabla)

126

Oak Ridge Office  

NLE Websites -- All DOE Office Websites (Extended Search)

September 30, 2008 September 30, 2008 Oak Ridge Associated Universities Attn: Mr. Ivan Boatner, General Counsel P.O. Box 117 Oak Ridge , Tennessee 37831 Dear Mr. Boatner: SUBJECT: CONTRACT NO. DE-AC05-060R23100, MODIFICATION A051 Enclosed is one fully executed copy of the subject document. This modification obligates the sum of $32,445,437.04, resulting in total obligations to this contract of $573,728,398.65. If you have any questions regarding this action, you may contact me at 576-0757 or via e-mail at ahlersdd@oro.doe.gov. Enclosure Darlene D. Ahlers Contract Specialist Procurement and Contracts Division ® PRINTED ON RECYCLED PAPER AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT 10 CODE I PAGE OF PAGES 1 I 1 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.

127

OAK RIDGE NATIONAL LABORATORY  

Office of Legacy Management (LM)

POST OFFICE 80X 2008 POST OFFICE 80X 2008 OAK RIDGE, TENNESSEE 37831 MANAGED BY MARTIN MARlElTA ENERGY SYSTEMS. INC. FOR THE U.S. DEPARTMENT OF ENERGY July 15, 1992 Dr. W. A Williams Department of Energy Trevion II Building EM-421 Washington, D. C. 20585 Dear Dr. Williams: Trip Report of ORNL Health Physics Support at the Uniroyal Chemical Company Painesvik, Ohio, on June 25,1992 As per agreement between DOE-HQ and Uniroyal of Painesville, on June 25, 1992, a member, the undersigned, from the Health and Safety Research Division of the Oak Rtdge Nattonal Laboratory (ORNL) provided health physics support for the Uniroyal Chemical Company. The job encompassed a contractor excavating around a fire hydrant and finding an underground water leak. The leak was in an area where no contamination was detected in an earlier survey.

128

Oak Ridge Office  

NLE Websites -- All DOE Office Websites (Extended Search)

October 1, 2008 October 1, 2008 Oak Ridge Associated Universities Attn: Mr. Ivan Boatner, General Counsel P.O. Box 117 Oak Ridge, Tennessee 37831 Dear Mr. Boatner: SUBJECT: CONTRACT NO. DE-AC05-060R23100, MODIFICATION A052 Enclosed is one fully executed copy of the subject document. This modification obligates the sum of $1,231,037.73, resulting in total obligations to this contract of $574,959,436.38 . If you have any questions regarding this action, you may contact me at 576-0757 or via e-mail at ahlersdd@oro.doe.gov. Enclosure Darlene D. Ahlers Contract Specialist Procurement and Contracts Division ® PRlNTto ON RECYCLED PAPER AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT 10 CODE I PAGE (t PAGES 1 1 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. I 5. PROJECT NO. (II applicab/e)

129

Oak Ridge Office  

NLE Websites -- All DOE Office Websites (Extended Search)

July 30, 2008 July 30, 2008 Oak Ridge Associated Universities Attn: Mr. Ivan Boatner, General Counsel P.O. Box 117 Oak Ridge, Tennessee 37831 Dear Mr. Boatner: SUBJECT: CONTRACT NO. DE-AC05-060R231 00, MODIFICATION A049 Enclosed is one fully executed copy of the subject document. This modification obligates the sum of $14,265 ,839.77, resulting in total obligations to this contract of $515,743,782 .56 . If you have any questions regarding this action, you may contact me at 576-0757 or via e-mail at ahlersdd@oro.doe.qov. Enclosure Darlene D. Ahlers Contract Specialist Procurement and Contracts Division ® PRINTfD ON RECYCLED PAPEA AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE J PAGE iF PAGES 1 1 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.

130

Oak Ridge Office  

NLE Websites -- All DOE Office Websites (Extended Search)

22, 2008 22, 2008 Oak Ridge Associ ated Universities Attn: Mr. Ivan Boatner, General Counsel P.O. Box 117 Oak Ridge, Tennessee 37831 Dear Mr. Boatner: SUBJECT: CONTRACT NO. DE-AC05 -060R23100, MODIFICATION M053 Enclosed is one fully executed copy of the subject modification which : revises Section J, Attachment H; attaches a supplement to Section J, Attachment H; and deletes Section J, Attachment D, Directives (List B), RCN ORAU-10 and replaces it with RCN ORAU-11. If you have any questions regarding this action, please contact me at 576-0757 or via e-mail at ahlersdd@oro.doe.gov. Enclosure Darlene D. Ahlers Contract Specialist Contracts and Property Management Branch Procurement and Contracts Division ® PRINTED ON RECYCLED PAPER AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

131

Oak Ridge Associated Universities  

Office of Legacy Management (LM)

Facility and Site Decommissioning U.S. Department of Energy ORAU 89lA-42 VERIFICATION OF REMEDIAL ACTION ON VENTILATION SYSTEMS JONES CHEMICAL LABORATORY UNIVERSITY OF CHICAGO CHICAGO, ILLINOIS M. R. LANDIS Radiological Site Assessment Program Manpower Education, Research, and Training Division FINAL REPORT JANUARY 1989 ORAU 89IA-42 3 VERIFICATION OF REMEDIAL ACTION ON VENTILATION SYSTEMS JONES CHEMICAL LABORATORY UNIVERSITY OF CHICAGO CHICAGO, ILLINOIS Prepared by M.R. Landis Radiological Site Assessment Program Manpower Education, Research, and Training Division Oak Ridge Associated Universities Oak Ridge, TN 37831-0117 Project Staff J.D. Berger R.D. Condra J.F. Lisco C.F. Weaver Prepared for U.S. Department of Energy as part of the Formerly Utilized Sites -

132

Oak Ridge Office of Environmental Management | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Oak Ridge Office of Environmental Management Ambitious vision drives Oak Ridge's progress Ambitious vision drives Oak Ridge's progress In 2014, Oak Ridge's EM program made...

133

Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA...  

Energy Savers (EERE)

Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office Oak Ridge...

134

Fuel Used for Off-Road Recreation: A Reassessment of the Fuel Use Model  

NLE Websites -- All DOE Office Websites (Extended Search)

Used for Off-Road Recreation: Used for Off-Road Recreation: A Reassessment of the Fuel Use Model Stacy C. Davis Lorena F. Truett Patricia S. Hu ORNL/TM-1999/100 Fuel Used for Off-Road Recreation: A Reassessment of the Fuel Use Model Stacy C. Davis Lorena F. Truett Patricia S. Hu July 1999 Prepared for the Office of Highway Information Management Federal Highway Administration U.S. Department of Transportation Washington, DC 20590 Prepared by the Statistics and Data Analysis Program Center for Transportation Analysis Oak Ridge National Laboratory Oak Ridge, TN 37831-6073 managed by Lockheed Martin Energy Research Corporation for the U.S. Department of Energy under Contract No. DE-AC05-96OR22464 Fuel Used for Off-Road Recreation: A Reassessment of the Fuel Use Model - iii - TABLE OF CONTENTS LIST OF ACRONYMS AND ABBREVIATIONS

135

Small Business Manager Oak Ridge National Laboratory  

E-Print Network (OSTI)

Keith Joy Small Business Manager Oak Ridge National Laboratory: Past, Present, and Future #12;2 OAK was the world's first continuously operated nuclear reactor Oak Ridge National Laboratory evolved from the Manhattan Project 2 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Overview_0604 #12;3 OAK RIDGE

136

Science Education Programs at Oak Ridge  

E-Print Network (OSTI)

Science Education Programs at Oak Ridge National Laboratory This publication spotlights the Science Education Programs at ORNL, which are administered by Oak Ridge Associated Universities through the Oak... A #12;Many Science Education Programs at Oak Ridge National Laboratory are managed by Oak Ridge

Ronquist, Fredrik

137

DOE Oak Ridge Office Freda H. Hopper  

E-Print Network (OSTI)

DOE Oak Ridge Office Freda H. Hopper Small Business Program Manager August 26, 2008 Oak Ridge BUILDING EM DISPOSAL CELL ORISE #12;Oak Ridge Reservation Jun08 2008 © All Rights Reserved 4 Oak Ridge National Laboratory Oak Ridge Institute for Science and Education Y-12 National Security Complex Y-12 Site

138

Oak Ridge National Laboratory site data for safety-analysis report  

SciTech Connect

The Oak Ridge National Laboratory site data contained herein were compiled in support of the United States Department of Energy (USDOE) Oak Ridge Operations Office Order OR 5481.1. That order sets forth assignment of responsibilities for safety analysis and review responsibilities and provides guidance relative to the content and format of safety analysis reports. The information presented in this document is intended for use by reference in individual safety analysis reports where applicable to support accident analyses or the establishment of design bases of significance to safety, and it is applicable only to Oak Ridge National Laboratory facilities in Bethel and Melton Valleys. This information includes broad descriptions of the site characteristics, radioactive waste handling and monitoring practices, and the organization and operating policies at Oak Ridge National Laboratory. The historical background of the Laboratory is discussed briefly and the overall physical situation of the facilities is described in the following paragraphs.

Fitzpatrick, F.C.

1982-12-01T23:59:59.000Z

139

Charter Oak Apartments East Campus  

E-Print Network (OSTI)

43 44 46 47 48 49 50 51 52 53 54 55 56 57 Hillside Road Hunting Lodge Road Separatist Road 61 62 63, I, L, W, X, Y Visitor Parking: Metered / Parking Garage Employee Parking: Area 1 Area 2 Area 3 Horsebarn Hill Area Inset #12;

Holsinger, Kent

140

AEC and Oak Ridge Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

transitions required was that of moving the center of authority for daily operations from Oak Ridge, splitting the responsibilities and placing segments of control in various other...

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Even more Oak Ridge transitions  

NLE Websites -- All DOE Office Websites (Extended Search)

Even more Oak Ridge transitions The University of Chicago managed the Clinton Laboratories until July 1, 1945 when Monsanto Chemical Company took over operations. Charles A....

142

Oak Ridge: A Historical Perspective  

NLE Websites -- All DOE Office Websites (Extended Search)

Alamos laboratory. They were implemented for industrial-scale uranium enrichment at the Oak Ridge, Tennessee Y-12 plant established during the war and provided much of the...

143

Oak Ridge National Laboratory 5-1 5. Oak Ridge National Laboratory  

E-Print Network (OSTI)

Oak Ridge National Laboratory 5-1 5. Oak Ridge National Laboratory ORNL is the largest science from, the work carried out in the days of the Manhattan Project. #12;Oak Ridge Reservation 5-2 Oak and Energy in the city of Oak Ridge, and several other locations around the Oak Ridge vicinity. Fig. 5

Pennycook, Steve

144

Oak Ridge ARI Overview | Department of Energy  

Energy Savers (EERE)

Oak Ridge ARI Overview Oak Ridge ARI Overview This fact sheet covers the asset revitalization initiative in Oak Ridge, TN. OakridgeFactSheet.pdf More Documents & Publications ARI...

145

Oak Ridge Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

O. Box 2001 Oak Ridge, Tennessee 37831 Mr. David Hemelright, Chair Oak Ridge Site Specific Advisory Board Post Office Box 2001 Oak Ridge, Tennessee 37831 Dear Mr. Hemelright: July...

146

Oak Ridge Associated Llniversities  

Office of Legacy Management (LM)

ii!fil ii!fil Prepared by Oak Ridge Associated Llniversities Prepared for U.S. Nuclear Regulatory Commission's Region I Office Supported by Safeguards dnd Materials Program Branch; Division of Quality Assurance, Safeguards, and Inspection Programs; Off ice of Inspection and r Enforcement I - CONFIRMATORY RADIOLOGICAL SURVEYS OF BUILDING 10 AND OUTSIDE AREAS ASSOCIATED WITH BUILDINGS 7 AND 8 WESTINGHOUSE NUCLEAR FUEL DIVISION CHESWICK, PENNSYLVANIA A. J. BOERNER Radiological Site Assessment Program Manpower Education, Research, and Training Division FINAL REPORT November 1984 CONFIRMATORY RADIOLOGICAL SURVEY OF BUILDING 10 AND OUTSIDE AREAS ASSOCIATED WITH BUILDINGS 7 AND 8 WESTINGHOUSE NUCLEAR FUEL DIVISION CHESWICK, PENNSYLVANIA Prepared for Safeguards and Materials Program Branch

147

CRAD, Configuration Management - Oak Ridge National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Configuration Management - Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Configuration Management - Oak Ridge National Laboratory High Flux Isotope Reactor February...

148

OLCF | Oak Ridge Leadership Computing Facility | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

OLCF Capabilities Working with OLCF OLCF Oak Ridge National Laboratory 865.241.6536 Home | User Facilities | OLCF OLCF | Oak Ridge Leadership Computing Facility SHARE Computational...

149

Independent Oversight Inspection, Oak Ridge National Laboratory...  

Energy Savers (EERE)

Oak Ridge National Laboratory - October 2008 Independent Oversight Inspection, Oak Ridge National Laboratory - October 2008 October 2008 Inspection of Emergency Management at the...

150

Independent Oversight Review, Oak Ridge National Laboratory ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

National Laboratory - January 2013 Independent Oversight Review, Oak Ridge National Laboratory - January 2013 January 2013 Review of the Oak Ridge National Laboratory High Flux...

151

Independent Activity Report, Oak Ridge National Laboratory -...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Oak Ridge National Laboratory - October 2011 Independent Activity Report, Oak Ridge National Laboratory - October 2011 October 2011 Operational Awareness Tour of Building 3525...

152

Independent Oversight Review, Oak Ridge National Laboratory ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Review, Oak Ridge National Laboratory - July 2011 Independent Oversight Review, Oak Ridge National Laboratory - July 2011 July 2011 Review of Selected Elements of Emergency...

153

Independent Oversight Environment, Oak Ridge National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environment, Oak Ridge National Laboratory - June 2006 Independent Oversight Environment, Oak Ridge National Laboratory - June 2006 June 2006 Inspection of the Environmental...

154

Oak Ridge National Laboratory - Global Security Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

Intelligence Point of Contact: JD Stauffer Intelligence Oak Ridge National Laboratory Post Office Box 2008, MS-6242 Oak Ridge, Tennessee 37831-6242 Telephone: (865) 241-6580...

155

Oak Ridge National Laboratory - Global Security Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

Director Defense Advanced Research Projects Agency Programs, Global Security Directorate Oak Ridge National Laboratory Post Office Box 2008, MS-6138 Oak Ridge, Tennessee...

156

Oak Ridge Site Specific Advisory Board  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Recommendations on Additional Waste Disposal Capacity on the Oak Ridge Reservation At our May 14, 2014, meeting, the Oak Ridge Site Specific Advisory Board approved the enclosed...

157

Oak Ridge City Center Technology Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge City Center Technology Demonstration Project David Thrash, Principal Investigator Oak Ridge City Center, LLC Track Name May 18, 2010 This presentation does not contain...

158

CRAD, Configuration Management - Oak Ridge National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Configuration Management - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR CRAD, Configuration Management - Oak Ridge National Laboratory High Flux Isotope...

159

Enforcement Documents - Oak Ridge National Laboratory | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge National Laboratory Enforcement Documents - Oak Ridge National Laboratory January 20, 2010 Enforcement Letter, Isotek Systems, LLC - January 20, 2010 Issued to Isotek...

160

Oak Ridge Associated Universities Procurement Questionnaire Application  

NLE Websites -- All DOE Office Websites (Extended Search)

Associated Universities Procurement Questionnaire Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office More Documents & Publications Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory ORO Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Road Accidents and Research  

Science Journals Connector (OSTI)

... of speed); later still to lack of care in all road users without exception (pedestrians, cyclists and drivers), that is, the whole community. Before blaming the 'human ... to probe into such other accident causes as the varying number of traffic units including pedestrians brought on to the roads by more hours of sunshine. Two drought years increased ...

MERVYN O'GORMAN

1944-05-20T23:59:59.000Z

162

Hazards of the Road  

Science Journals Connector (OSTI)

... judges), the meeting considered its subject, under four main headings: the driver, the pedestrian, the vehicle and the road. No doubt remained at the conclusion that the fitness ... 1949 (when the Road Research Laboratory first prepared comprehensive records) and 1961, casualties to pedestrians have been increasing as traffic increased but not in direct proportion. On the other ...

DAVID NAPLEY

1962-09-29T23:59:59.000Z

163

Death Valley TronaWestend  

E-Print Network (OSTI)

Goldfield Lida Tempiute Gold Point Beatty Amargosa Valley Mercury Indian Springs PiocheCaselton Prince Nevada Test Site East Mormon Mountain Gold Point Delamar Valley Amargosa Valley Millers Dry Lake Dry Lake

Laughlin, Robert B.

164

Global Energy Partners, LLC 500 Ygnacio Valley Road, Suite 450  

E-Print Network (OSTI)

.482.2000 F: 925.284.3147 E: globalhq@gepllc.com ASSESSMENT OF DEMAND RESPONSE AND ENERGY EFFICIENCY POTENTIAL Response and Energy Efficiency Potential for Midwest ISO, Global Energy Partners, LLC. Walnut Creek, CA FOR MIDWEST ISO Draft Report #1314 July 2010 #12;#12;Global Energy Partners, LLC iii DISCLAIMER OF WARRANTIES

165

Environmental Assessment for the Oak Ridge Science and Technology Project at the Oak Ridge National Laboratory, Oak Ridge, Tennessee  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81(E)/020508 81(E)/020508 DOE/EA-1575 Environmental Assessment for the Oak Ridge Science and Technology Project at the Oak Ridge National Laboratory, Oak Ridge, Tennessee February 2008 U. S. Department of Energy Oak Ridge Office 06-281(E)/020508 iii CONTENTS FIGURES.....................................................................................................................................................iv TABLES ......................................................................................................................................................iv ACRONYMS................................................................................................................................................ v 1. INTRODUCTION

166

Oak Ridge Associated  

Office of Legacy Management (LM)

2012 IL.06 ·128 2012 IL.06 ·128 Oak Ridge Associated Post Of/ICE: 80 '17 Unl e Sllles Oa d. )Cp€ T nness £: 37 1 ·01 '7 '-1.\0.-»"--" 10. June 14, 1989 Mr. Andrew Wallo ruSRAP/Surplus Facilities Group Division of Facili y & Site Decommissioning Projects Office of Nuclear Energy U.S. D~partment of Energy Washington, D.C. 20545 Subject: LETTER REPORT - VERIFIC~TION ACTIVITIES AT UNIVERSITY OF CHICAGO Dear Mr. Wallo: Enclosed is the report for the recent ORAU verification activities involving facilities at the tJniversity of Chicago, remediated and/or surveyed by Argonne National Laboratory. If you have any questions concerning this information contact me or Jim Berger at FrS 626-~908 or 626-3305, respectively.

167

Oak Ridge Site Specific Advisory Board  

Office of Environmental Management (EM)

... 6:206:30 IV. Presentation: Oak Ridge Environmental Management Stewardship Program (P. Halsey, S....

168

Oak Ridge National Laboratory National Security Programs  

E-Print Network (OSTI)

Oak Ridge National Laboratory National Security Programs Dr. Michael A. Kuliasha, Chief Scientist National Security Technologies Oak Ridge National Laboratory #12;2 OAK RIDGE NATIONAL LABORATORY U. S Security Challenges #12;3 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY How Will Our Enemies

169

Department of Energy Oak Ridge Office  

E-Print Network (OSTI)

Department of Energy Oak Ridge Office PO. Box 2001 Oak Ridge,Tennessee 37831 Contracting Officers, manages and operates the governrnent-owned Oak Ridge National Laboratory (ORNL) on behalf of DOE reimbursableIA work which DOE accepts under the joint MOA . #12;DOD Contracting Officers -2- The DOE Oak Ridge

170

West Valley Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE))

The West Valley Demonstration Project came into being through the West Valley Demonstration Project Act of 1980. The Act requires that the DOE is responsible for solidifying the high-level waste, disposing of waste created by the solidification, and decommissioning the facilities used in the process.

171

Oak Ridge National Laboratory 5-1 5. Oak Ridge National Laboratory  

E-Print Network (OSTI)

Oak Ridge National Laboratory 5-1 5. Oak Ridge National Laboratory The Oak Ridge National. In addition, more than 3,000 visiting scientists spend 2 weeks or longer in Oak Ridge each year at the 12.1.1 Mission ORNL lies in the southwest corner of DOE's Oak Ridge Reservation (ORR) (Fig. 5.1) and is managed

Pennycook, Steve

172

Oak Ridge National Laboratory 5-1 5. Oak Ridge National Laboratory  

E-Print Network (OSTI)

Oak Ridge National Laboratory 5-1 5. Oak Ridge National Laboratory The Oak Ridge National. In addition, more than 3,000 visiting scientists spend 2 weeks or longer in Oak Ridge each year at the 12 5.1.1 Mission ORNL lies in the southwest corner of DOE's Oak Ridge Reservation (ORR) (Fig. 5

Pennycook, Steve

173

Introduction to the Oak Ridge Reservation 1-1 1. Introduction to the Oak Ridge Reservation  

E-Print Network (OSTI)

Introduction to the Oak Ridge Reservation 1-1 1. Introduction to the Oak Ridge Reservation The Oak components, the Oak Ridge National Laboratory (ORNL) and the Y-12 National Security Complex (Y-12 Complex sector business/industrial park; the Oak Ridge Institute for Science and Education (ORISE) South Campus

Pennycook, Steve

174

Introduction to the Oak Ridge Reservation 1-1 1. Introduction to the Oak Ridge Reservation  

E-Print Network (OSTI)

Introduction to the Oak Ridge Reservation 1-1 1. Introduction to the Oak Ridge Reservation The Oak) operating components, the Oak Ridge National Laboratory (ORNL) and the Y-12 National Security Complex (Y-12 diffusion plant that is undergoing environmental restoration; the Oak Ridge Institute for Science

Pennycook, Steve

175

Oak Ridge National Laboratory 5-1 5. Oak Ridge National Laboratory  

E-Print Network (OSTI)

1 Oak Ridge National Laboratory 5-1 5. Oak Ridge National Laboratory ORNL is the largest science from, the work carried out in the days of the Manhattan Project. #12;Oak Ridge Reservation Annual Site Environmental Report--2013 Oak Ridge National Laboratory 5-2 Fig. 5.1. Location of Oak Ridge National Laboratory

Pennycook, Steve

176

Introduction to the Oak Ridge Reservation 1-1 1. Introduction to the Oak Ridge Reservation  

E-Print Network (OSTI)

Introduction to the Oak Ridge Reservation 1-1 1. Introduction to the Oak Ridge Reservation The Oak-12 National Security Complex, Oak Ridge National Laboratory, and East Tennessee Technology Park have involved, and continue to involve, the use of radiological and hazardous materials. The Oak Ridge

Pennycook, Steve

177

Waste Acceptance for Vitrified Sludge from Oak Ridge Tank Farms  

SciTech Connect

The Tanks Focus Area of the DOE`s Office of Science and Technology (EM-50) has funded the Savannah River Technology Center (SRTC) to develop formulations which can incorporate sludges from Oak Ridge Tank Farms into immobilized glass waste forms. The four tank farms included in this study are: Melton Valley Storage Tanks (MVST), Bethel Valley Evaporation Service Tanks (BVEST), Gunite and Associated Tanks (GAAT), and Old Hydrofracture Tanks (OHF).The vitrified waste forms must be sent for disposal either at the Waste Isolation Pilot Plant (WIPP) or the Nevada Test Site (NTS). Waste loading in the glass is the major factor in determining where the waste will be sent and whether the waste will be remote-handled (RH) or contact-handled (CH). In addition, the waste loading significantly impacts the costs of vitrification operations and transportation to and disposal within the repository.This paper focuses on disposal options for the vitrified Oak Ridge Tank sludge waste as determined by the WIPP (1) and NTS (2) Waste Acceptance Criteria (WAC). The concentrations for both Transuranic (TRU) and beta/gamma radionuclides in the glass waste form will be presented a a function of sludge waste loading. These radionuclide concentrations determine whether the waste forms will be TRU (and therefore disposed of at WIPP) and whether the waste forms will be RH or CH.

Harbour, J.R. [Westinghouse Savannah River Company, AIKEN, SC (United States); Andrews, M.K.

1998-03-01T23:59:59.000Z

178

Oak Ridge Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge Site Oak Ridge Site Oak Ridge Site Demolition progress at Oak Ridge Demolition progress at Oak Ridge Recovery Act workers at Alpha 5 at the Y-12 National Security Complex at Oak Ridge, Tenn., survey waste as part of the characterization process to determine its proper disposition path Recovery Act workers at Alpha 5 at the Y-12 National Security Complex at Oak Ridge, Tenn., survey waste as part of the characterization process to determine its proper disposition path Demolition progress at Oak Ridge Recovery Act workers at Alpha 5 at the Y-12 National Security Complex at Oak Ridge, Tenn., survey waste as part of the characterization process to determine its proper disposition path OVERVIEW The U.S. Department of Energy's (DOE) Oak Ridge Reservation is located on

179

Shady Oaks | Open Energy Information  

Open Energy Info (EERE)

Oaks Oaks Jump to: navigation, search Name Shady Oaks Facility Shady Oaks Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Goldwind Developer Mainstream Renewable and Goldwind Energy Purchaser ComEd Location Shabbona IL Coordinates 41.81354658°, -88.90651703° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.81354658,"lon":-88.90651703,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

180

Oak Ridge Office of Environmental ...  

Office of Environmental Management (EM)

Management Program Plan October 2013 FY 2014 to 2024 U.S. DEPARTMENT OF ENERGY OREM III Oak Ridge Office of Environmental Management Program Plan FY 2014 to 2024 October 2013...

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

AEC and Oak Ridge Transitions  

NLE Websites -- All DOE Office Websites (Extended Search)

States arsenal. The transition for X-10 from the Graphite Reactor to being named the Oak Ridge National Laboratory on February 1, 1948 was not as smooth or as easily defined....

182

Oak Ridge picking up momentum  

NLE Websites -- All DOE Office Websites (Extended Search)

up momentum At the beginning of 1948 things were beginning to settle down a bit in Oak Ridge. The Y-12 Plant was busy making uranium metal and machining parts for nuclear...

183

Oak Ridge Site Specific Advisory ...  

Office of Environmental Management (EM)

Ridge Site Specific Advisory Board * P.O. Box 2001, EM-91, Oak Ridge, TN 37831 Phone: 865-241-4583, 865-241-4584, 1-800-382-6938 * Fax: 865-574-3521 * Internet:...

184

Visibility and Road Accidents  

Science Journals Connector (OSTI)

... road accidents from a very unusual point of view. These writers investigated the beliefs of pedestrians regarding their own visibility, to see how far these beliefs compared with their actual ... drive.

1940-11-23T23:59:59.000Z

185

Rapid road repair vehicle  

DOE Patents (OSTI)

Disclosed is a rapid road repair vehicle capable of moving over a surface to be repaired at near normal posted traffic speeds to scan for and find at the high rate of speed, imperfections in the pavement surface, prepare the surface imperfection for repair by air pressure and vacuum cleaning, applying a correct amount of the correct patching material to effect the repair, smooth the resulting repaired surface, and catalog the location and quality of the repairs for maintenance records of the road surface. The rapid road repair vehicle can repair surface imperfections at lower cost, improved quality, at a higher rate of speed than was not heretofor possible, with significantly reduced exposure to safety and health hazards associated with this kind of road repair activities in the past. 2 figs.

Mara, L.M.

1998-05-05T23:59:59.000Z

186

Rapid road repair vehicle  

DOE Patents (OSTI)

Disclosed is a rapid road repair vehicle capable of moving over a surface to be repaired at near normal posted traffic speeds to scan for and find an the high rate of speed, imperfections in the pavement surface, prepare the surface imperfection for repair by air pressure and vacuum cleaning, applying a correct amount of the correct patching material to effect the repair, smooth the resulting repaired surface, and catalog the location and quality of the repairs for maintenance records of the road surface. The rapid road repair vehicle can repair surface imperfections at lower cost, improved quality, at a higher rate of speed than was was heretofor possible, with significantly reduced exposure to safety and health hazards associated with this kind of road repair activities in the past.

Mara, Leo M. (Livermore, CA)

1998-01-01T23:59:59.000Z

187

Imperial Valley College Portland State University Imperial Valley College  

E-Print Network (OSTI)

Imperial Valley College Portland State University Imperial Valley College Transfer Worksheet If you) at Imperial Valley College (IVC), you can rest assured that those credits will also transfer to Portland State. Degree Requirements (BA, BS) #12;Imperial Valley College Portland State University 2. DEGREE REQUIREMENTS

Caughman, John

188

Oak Ridge Universities  

Office of Legacy Management (LM)

Oak Ridge Oak Ridge Universities Prepared for Division of Remedial Action Projects U.S. Department of Energy C O M P R E H E N S I V E R A D I O L O G I C A L S U R V E Y O F F - S I T E P R O P E R T Y X N I A G A R A F A L L S S T O R A G E S I T E L E W l s T o N , N E W Y O R K J . D . B E R G E R R a d i o l o g i c a l M a n p o w e r E d u c a t i o n ' Site Assessment Program Research, and Training Division FINA], May REPORT 1 9 8 4 COMPREHENSIVE MDIOLOGICAI SURVEY OFF-SITE PROPERTY X NIAGARA FAI-LS STORAGE SITE LEWISTON' NEI'I YORK u. s. F o r m e r l y U t i l i z e d P r e p a r e d f o r Department of EnergY a s p a r t o f t h e S i t e s - - R e u e d i a l A c t i o n P r o g r a m R a d i o l o g i c a l M a n p o w e r E d u c a t i o n , O a k R i d g e O a k R i d g e , J . D . B e r g e r P r o j e c t J . B u r d e n * R . D . C o n d r a D . L . D a v i s J . S . E p l e r * P . W . F r a m e W . 0 . H e l t o n R . C . G o s s l e e S t a f f J . A . P e r r y I { . L . S n i t h T . J . S o w e l l G . M . S t e p h e n s L . B . T a u s * C . F . W e a v e r B . S . Z a c h a r e k Prepared by S i t e A s s e

189

Oak Ridge Office of Environmental Management P.O  

Office of Environmental Management (EM)

O . Box 2001 Oak Ridge, Tennessee 37831 Mr. David Hemelright, Chair Oak Ridge Site Specific Advisory Board Post Office Box 2001 Oak Ridge, Tennessee 37831 Dear Mr. Hemelright:...

190

Oak Ridge Metrology Center | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

Global Security Manufacturing and Technical Services Oak Ridge Metrology Center Oak Ridge Metrology Center Oak Ridge Metrology Center has an international reputation for...

191

Oak Ridge Reservation Emergency Sectors Changing | Y-12 National...  

NLE Websites -- All DOE Office Websites (Extended Search)

Oak Ridge Reservation ... Oak Ridge Reservation Emergency Sectors Changing Posted: March 11, 2014 - 12:23pm OAK RIDGE, Tenn. - On March 12, the Tennessee Emergency Management...

192

Recommendation 208 : Use White Paper on Oak Ridge Reservation...  

Office of Environmental Management (EM)

8 : Use White Paper on Oak Ridge Reservation Recommendation 208 : Use White Paper on Oak Ridge Reservation The ORSSAB approved the enclosed recommendation suggesting DOE Oak Ridge...

193

Inspection, Oak Ridge National Laboratory - July 2004 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge National Laboratory - July 2004 Inspection, Oak Ridge National Laboratory - July 2004 July 2004 Inspection of Environment, Safety, and Health Management at the Oak Ridge...

194

Independent Oversight Review, Oak Ridge Office - August 2011...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- August 2011 Independent Oversight Review, Oak Ridge Office - August 2011 August 2011 Review of the Oak Ridge Office Oversight of the Fire Protection Program at the Oak Ridge...

195

Oak Ridge National Laboratory - Computing and Computational Sciences...  

NLE Websites -- All DOE Office Websites (Extended Search)

Oak Ridge to acquire next generation supercomputer Oak Ridge to acquire next generation supercomputer The U.S. Department of Energy's (DOE) Oak Ridge Leadership Computing Facility...

196

Recommendation 217: Stewardship Point of Contact for the Oak...  

Office of Environmental Management (EM)

Recommendation 217: Stewardship Point of Contact for the Oak Ridge Reservation Recommendation 217: Stewardship Point of Contact for the Oak Ridge Reservation The Oak Ridge Site...

197

Oak Ridge Reservation Needs Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge Reservation Needs Assessment Oak Ridge Reservation Needs Assessment December 1997 This Needs Assessment for former Oak Ridge National Laboratory and Y-12 Nuclear Security...

198

Trailer homes in Oak Ridge | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

Trailer homes in Oak Ridge Trailer homes in Oak Ridge An aerial of Oak Ridge showing the extensive use of trailer homes...

199

Oak Ridge Science and Technology Park | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Economic Development | Oak Ridge Science and Technology Park SHARE Oak Ridge Science and Technology Park The Oak Ridge Science and Technology Park is ideal for companies that want...

200

2014 Annual Planning Summary for the Oak RIdge National Laboratory...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

4 Annual Planning Summary for the Oak RIdge National Laboratory Site Office 2014 Annual Planning Summary for the Oak RIdge National Laboratory Site Office The Oak Ridge National...

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Green Valley Galaxies  

E-Print Network (OSTI)

The "green valley" is a wide region separating the blue and the red peaks in the ultraviolet-optical color magnitude diagram, first revealed using GALEX UV photometry. The term was coined by Christopher Martin in 2005. Green valley highlights the discriminating power of UV to very low relative levels of ongoing star formation, to which the optical colors, including u-r, are insensitive. It corresponds to massive galaxies below the star-forming "main" sequence, and therefore represents a critical tool for the study of the quenching of star formation and its possible resurgence in otherwise quiescent galaxies. This article reviews the results pertaining to morphology, structure, environment, dust content and gas properties of green valley galaxies in the local universe. Their relationship to AGN is also discussed. Attention is given to biases emerging from defining the "green valley" using optical colors. We review various evolutionary scenarios and we present evidence for a new, quasi-static view of the green ...

Salim, Samir

2015-01-01T23:59:59.000Z

202

EA-1697: San Joaquin Valley Right-of-Way Project, California | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

97: San Joaquin Valley Right-of-Way Project, California 97: San Joaquin Valley Right-of-Way Project, California EA-1697: San Joaquin Valley Right-of-Way Project, California Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of right-of-way maintenance (including facility inspection and repair, vegetation management, and equipment upgrades for transmission lines and associated rights-or-way, access roads, substations, and a maintenance facility) in the San Joaquin Valley in California. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download December 2, 2011 EA-1697: Finding of No Significant Impact Right-of-Way Maintenance in the San Joaquin Valley, California December 2, 2011 EA-1697: Final Environmental Assessment

203

Oak Ridge K-25 Gaseous Diffusion Plant, Former Production Workers Screening  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

K-25 Gaseous Diffusion Plant, Former Production Workers K-25 Gaseous Diffusion Plant, Former Production Workers Screening Projects Oak Ridge K-25 Gaseous Diffusion Plant, Former Production Workers Screening Projects Project Name: Worker Health Protection Program Covered DOE Site: K-25 Worker Population Served: Production Workers Principal Investigator: Jim Frederick Co-Principal Investigator: Steven Markowitz, MD Toll-free Telephone: (888) 241-1199 Local Outreach Office: Bruce Lawson 133 Raleigh Road Oak Ridge, TN 37830 Local Medical Clinics: ParkMed 110 S. Illinois Avenue Oak Ridge, TN 37380 Website: http://www.worker-health.org/ This project is conducted by the United Steelworkers in conjunction with Queens College of the City University of New York. The program is being offered as a service to both former and current workers. Free of charge,

204

Enforcement Documents - West Valley Demonstration Project | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project Enforcement Documents - West Valley Demonstration Project December 7, 1999 Preliminary Notice of Violation, West Valley Nuclear Services -...

205

Oversight Reports - West Valley Demonstration Project | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project Oversight Reports - West Valley Demonstration Project August 24, 2012 Independent Activity Report, West Valley Demonstration Project - July 2012...

206

Imperial Valley Geothermal Area | Department of Energy  

Energy Savers (EERE)

Imperial Valley Geothermal Area Imperial Valley Geothermal Area The Imperial Valley Geothermal project consists of 10 generating plants in the Salton Sea Known Geothermal Resource...

207

The Road to 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Road to 2010 Road to 2010 Addressing the nuclear question in the twenty first century July 2009 The Road to 2010 Addressing the nuclear question in the twenty first century Presented to Parliament by the Prime Minister, by Command of Her Majesty July 2009 Cm 7675 £14.35 Photograph on page 16 by EDF; © EDF Photograph on page 20 by BNFL; © BNFL, image from www.IAEA.org Photograph on page 26 by British Army; © Crown copyright/MoD, image from www.photos.mod.uk Photograph on page 34 by CTBTO; © CTBTO Preparatory Commission, image from www.CTBTO.org Photograph on pages 42 and 45 by Dean Calma; © Dean Calma, image from www.IAEA.org © Crown Copyright 2009 The text in this document (excluding the Royal Arms and other departmental or agency logos) may be reproduced free of

208

Oak Ridge Leadership Computing Facility  

NLE Websites -- All DOE Office Websites

Oak Ridge Leadership Computing Facility Oak Ridge Leadership Computing Facility The OLCF was established at Oak Ridge National Laboratory in 2004 with the mission of standing up a supercomputer 100 times more powerful than the leading systems of the day. Connect with OLCF Facebook Twitter YouTube Vimeo Search OLCF.ORNL.GOV Home About OLCF Overview Leadership Team Groups Org Chart User Council Careers Visitor Information & Tours Contact Us Leadership Science Biological Sciences Chemistry Computer Science Earth Science Engineering Materials Science Physics 2013 INCITE Projects 2013 ALCC Projects Computing Resources Titan Cray XK7 Eos Lens EVEREST Rhea Sith Smoky Data Management Data Analysis Center Projects Adios CCI eSiMon File System Projects IOTA OpenSFS SWTools XGAR User Support Getting Started System User Guides KnowledgeBase

209

Oak Ridge Associated  

Office of Legacy Management (LM)

l/s1 Prepared by Oak Ridge Associated 'Universities Prepared for Division of Remedial Action Froiects ilJ..S. Department of Energy N( , /7 C O M P R E H E N S I V E R A D I O L O G I C A L S U R V E Y O F F . S I T E P R O P E R T Y F N I A G A R A F A L L S S T O R A G E S I T E L E W I S T O N , N E W Y O R K J. D. BERGER Radiologieal Site Assessment Program . Manpower Education, Research, and Training Division FINAL REPORT February 1984 COMPREHENSIVE RADIOLOGICAI SURVEY OFF-SITE PROPERTY F NIAGARA FA.LLS STORAGE SITE IEI{ISTON, NEI{ YORK Prepared for U . S . D e p a r t m e n t o f E n e r g Y a s p a r t o f t h e F o r m e r l y U t i l i z e d S i t e s - - R e m e d i a l A c t i o n P r o g r a m J . D . B e r g e r P r o j e c t S t a f f R . D . C o n d r a M . W . S t a f f o r d R . C . G o s s l e e G . M . S t e P h e n s W . 0 . E e L t o n C . F . W e a v e r T . J . S o w e l l B . S . Z a c h a r e k Prepared by R a d i o l o g i c a l S i t e A s s e s s m e n t P r o g r a m Manpower Education, Research, and Training Division

210

Rapid road repair vehicle  

DOE Patents (OSTI)

Disclosed are improvments to a rapid road repair vehicle comprising an improved cleaning device arrangement, two dispensing arrays for filling defects more rapidly and efficiently, an array of pre-heaters to heat the road way surface in order to help the repair material better bond to the repaired surface, a means for detecting, measuring, and computing the number, location and volume of each of the detected surface imperfection, and a computer means schema for controlling the operation of the plurality of vehicle subsystems. The improved vehicle is, therefore, better able to perform its intended function of filling surface imperfections while moving over those surfaces at near normal traffic speeds.

Mara, Leo M. (Livermore, CA)

1999-01-01T23:59:59.000Z

211

Oak Ridge Facilities Construction | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities ... Oak Ridge Facilities Construction Work in wet and mud was common during the construction of Oak Ridge facilities...

212

Oak Ridge Office of Environmental Management  

Office of Environmental Management (EM)

Oak Ridge Office of Environmental Management Congressional Nuclear Cleanup Caucus Mark Whitney Manager Oak Ridge, TN May 16, 2013 www.energy.govEM 2 EM Program Overview ETTP ORNL...

213

Oak Ridge Associated Universities 2010 Bibliography  

NLE Websites -- All DOE Office Websites (Extended Search)

0 Bibliography Prepared by ORAU Communications and Marketing P.O. Box 117, MS 44 Oak Ridge, Tennessee 37831-0117 www.orau.orgabout-oraupublications.aspx Oak Ridge Associated...

214

Oak Ridge Site Specific Advisory Board  

Office of Environmental Management (EM)

October 13, 2011 John Eschenberg Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Mr. Eschenberg: Recommendation 207:...

215

Oak Ridge Site Specific Advisory Board  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 12, 2012 Susan Cange Acting Assistant Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Ms. Cange: Recommendation...

216

Oak Ridge Site Specific Advisory Board  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2013 Mark Whitney Oak Ridge Office of Environmental Management U.S. Department of Energy P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Mr. Whitney: Recommendation 216:...

217

Oak Ridge Site Specific Advisory Board  

Office of Environmental Management (EM)

May 9, 2013 Susan Cange Deputy Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Ms. Cange: Recommendation 215:...

218

Oak Ridge Site Specific Advisory Board  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge Site Specific Advisory Board Wednesday, March 12, 2014, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (D....

219

UT gets involved at Oak Ridge  

NLE Websites -- All DOE Office Websites (Extended Search)

UT gets involved at Oak Ridge In 1947, the Atomic Energy Commission took over Oak Ridge from the Manhattan Project's General Groves and Colonel Nichols. The struggle to maintain...

220

Introduction to the Oak Ridge Reservation 1-1 1. Introduction to the Oak Ridge Reservation  

E-Print Network (OSTI)

1 Introduction to the Oak Ridge Reservation 1-1 1. Introduction to the Oak Ridge Reservation The Oak Ridge Reservation (ORR) is a 13,560 ha (33,508-acre) federally owned site located in the counties components, the Oak Ridge National Laboratory (ORNL) and the Y-12 National Security Complex (Y-12 Complex

Pennycook, Steve

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Oak Ridge National Laboratory 5-1 5. Oak Ridge National Laboratory  

E-Print Network (OSTI)

Oak Ridge National Laboratory 5-1 5. Oak Ridge National Laboratory ORNL is the largest science, but very different from, the work carried out in the days of the Manhattan Project. #12;Oak Ridge Reservation Annual Site Environmental Report--2012 Oak Ridge National Laboratory 5-2 Fig. 5.1. Location

Pennycook, Steve

222

Changes in Soil Quality Due to Grazing and Oak Tree Removal in California Blue Oak  

E-Print Network (OSTI)

investigated (carbon, nitrogen, phosphorus, pH) within 5 to 15 years following tree removal. Following treeChanges in Soil Quality Due to Grazing and Oak Tree Removal in California Blue Oak Woodlands1 Trina of grazing and oak tree removal on soil quality and fertility were examined in a blue oak (Quercus douglasii

Standiford, Richard B.

223

Oak Ridge Site Specific Advisory Board Meetings  

Energy.gov (U.S. Department of Energy (DOE))

Lists links to the Oak Ridge Site Specific Advisory Board Meetings. The links provide meeting documents available for download.

224

Oak Ridge Site Specific Advisory Board Contacts  

Energy.gov (U.S. Department of Energy (DOE))

Lists Oak Ridge Site Specific Advisory Board contact information including mailing address, phone numbers, and contact email addresses.

225

21st Century jobs initiative - Tennessee`s Resource Valley. Progress report 1995  

SciTech Connect

Tennessee`s Resource Valley, a regional economic development organization, was asked to facilitate a two-year, $750,000 grant from the Department of Energy. The grant`s purpose is to make the East Tennessee region less dependent on federal funds for its economic well-being and to increase regional awareness of the advantages of proximity to the Department of Energy facilities in Oak Ridge. Tennessee`s Resource Valley`s mission is to market the mid-East Tennessee region`s business location advantages to corporate decision makers and to facilitate regional initiatives that impact the creation of quality job opportunities. Tennessee`s Resource Valley represents the following fifteen (15) counties in East Tennessee: Anderson, Blount, Campbell, Claiborne, Cocke, Grainger, Jefferson, Knox, Loudon, Monroe, Morgan, Scott, Sevier, and Union.

NONE

1995-12-20T23:59:59.000Z

226

Research and Road Traffic  

Science Journals Connector (OSTI)

... been advocated for Great Britain within my knowledge, deserve other than the fervent opposition of pedestrians as well as motorists. They can do nothing for safety?they do not discover ... relate the number of road fatalities in a place to the amount of traffic flow (pedestrian and other) there. It would establish at an early moment the machinery for measuring ...

MERVYN O'GORMAN

1934-09-01T23:59:59.000Z

227

DOE Names Oak Ridge Cleanup Manager  

Energy.gov (U.S. Department of Energy (DOE))

Oak Ridge, Tenn. The U.S. Department of Energy (DOE) announced today the selection of Sue Cange as the manager of the Oak Ridge Office of Environmental Management (EM). Previously, Cange served as the acting manager of EMs Oak Ridge Office since May 2014, and she has served as the deputy manager since March 2011.

228

OAK RIDGE NATIONAL LABORATORY SMALL BUSINESS CONFERENCE  

E-Print Network (OSTI)

1 OAK RIDGE NATIONAL LABORATORY SMALL BUSINESS CONFERENCE Bechtel Jacobs Company LLC (BJC) Small.S. Department of Energy's (DOE's) operations in Oak Ridge, Tennessee and associated areas. · Cleanup commercial uses for many Oak Ridge facilities. #12;4 #12;5 #12;6 #12;7 CONTACT INFORMATION · Basic BJC

229

Title: Oak Ridges Moraine Data Creator /  

E-Print Network (OSTI)

Title: Oak Ridges Moraine Data Creator / Copyright Owner: Ontario Ministry of Natural Resources. Ministry of Natural Resources. "Oak Ridges Moraine" [electronic resource: vector]. Peterborough, Ontario: NAD83 /UTM Resolution: N/A Coordinates: N/A Index Map: N/A Keywords (Place): Oak Rides Moraine

230

E-Print Network 3.0 - actively articulated suspension Sample...  

NLE Websites -- All DOE Office Websites (Extended Search)

COATINGS: FORMATION OF MULLITE COATINGS ON SiC Summary: COLLOIDAL SUSPENSION Beth L. Armstrong Oak Ridge National Laboratory Bethel Valley Road, P.O. Box 2008, Oak... with...

231

E-Print Network 3.0 - active suspension design Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

COATINGS: FORMATION OF MULLITE COATINGS ON SiC Summary: COLLOIDAL SUSPENSION Beth L. Armstrong Oak Ridge National Laboratory Bethel Valley Road, P.O. Box 2008, Oak... with...

232

Contracting with Oak Ridge National  

E-Print Network (OSTI)

Contracting with Oak Ridge National Laboratory Presented at the 5nd Annual East Tennessee Veterans our web site for Upcoming Subcontracting Opportunities at www.ornl.gov/adm/contracts/majorprocs.pdf · Register your business in Supplier Information Database at www.ornl.gov/adm/contracts/supplierportal. shtml

233

Oak Ridge callibration recall program  

SciTech Connect

A development effort was initiated within the Oak Ridge metrology community to address the need for a more versatile and user friendly tracking database that could be used across the Oak Ridge complex. This database, which became known as the Oak Ridge Calibration Recall Program (ORCRP), needed to be diverse enough for use by all three Oak Ridge facilities, as well as the seven calibration organizations that support them. Various practical functions drove the initial design of the program: (1) accessible by any user at any site through a multi-user interface, (2) real-time database that was able to automatically generate e-mail notices of due and overdue measuring and test equipment, (3) large memory storage capacity, and (4) extremely fast data access times. In addition, the program needed to generate reports on items such as instrument turnaround time, workload projections, and laboratory efficiency. Finally, the program should allow the calibration intervals to be modified, based on historical data. The developed program meets all of the stated requirements and is accessible over a network of computers running Microsoft Windows software.

Falter, K.G.; Wright, W.E. [Oak Ridge National Lab., TN (United States); Pritchard, E.W. [Oak Ridge Centers for Manufacturing Technology, TN (United States)] [and others

1996-12-31T23:59:59.000Z

234

Tweets on the road  

E-Print Network (OSTI)

The pervasiveness of mobile devices, which is increasing daily, is generating a vast amount of geo-located data allowing us to gain further insights into human behaviors. In particular, this new technology enables users to communicate through mobile social media applications, such as Twitter, anytime and anywhere. Thus, geo-located tweets offer the possibility to carry out in-depth studies on human mobility. In this paper, we study the use of Twitter in transportation by identifying tweets posted from roads and rails in Europe between September 2012 and November 2013. We compute the percentage of highway and railway segments covered by tweets in 39 countries. The coverages are very different from country to country and their variability can be partially explained by differences in Twitter penetration rates. Still, some of these differences might be related to cultural factors regarding mobility habits and interacting socially online. Analyzing particular road sectors, our results show a positive correlation b...

Lenormand, Maxime; Colet, Pere; Ramasco, Jos J

2014-01-01T23:59:59.000Z

235

Hoopa Valley Small Scale Hydroelectric Feasibility Project  

SciTech Connect

This study considered assessing the feasibility of developing small scale hydro-electric power from seven major tributaries within the Hoopa Valley Indian Reservation of Northern California (http://www.hoopa-nsn.gov/). This study pursued the assessment of seven major tributaries of the Reservation that flow into the Trinity River. The feasibility of hydropower on the Hoopa Valley Indian Reservation has real potential for development and many alternative options for project locations, designs, operations and financing. In order to realize this opportunity further will require at least 2-3 years of intense data collection focusing on stream flow measurements at multiple locations in order to quantify real power potential. This also includes on the ground stream gradient surveys, road access planning and grid connectivity to PG&E for sale of electricity. Imperative to this effort is the need for negotiations between the Hoopa Tribal Council and PG&E to take place in order to finalize the power rate the Tribe will receive through any wholesale agreement that utilizes the alternative energy generated on the Reservation.

Curtis Miller

2009-03-22T23:59:59.000Z

236

Typical Oak Ridge cemesto houses and city bus | Y-12 National...  

NLE Websites -- All DOE Office Websites (Extended Search)

Typical Oak Ridge cemesto ... Typical Oak Ridge cemesto houses and city bus Typical Oak Ridge cemesto houses and city bus...

237

OSTI raises $2,400 for Norwood, Dutch Valley, Andersonville, Briceville,  

Office of Scientific and Technical Information (OSTI)

FOR IMMEDIATE RELEASE February 1, 2006 OSTI raises $2,400 for Norwood, Dutch Valley, Andersonville, Briceville, and Fairview Elementary Schools Oak Ridge, TN - The U.S. Department of Energy (DOE) Office of Scientific and Technical Information (OSTI) raised $2,400 during its recent annual Adopt-A-School auction featuring auctioneer Bear Stevenson. The auction was held at Kern Methodist Church in Oak Ridge and benefits Norwood, Andersonville, Briceville, Dutch Valley, and Fairview Elementary Schools. Supplies were delivered to the schools January 27, and included construction paper, markers, pencils, pens, staplers, paper clips, magic tape, video tape, post-it-notes, tissues, file folders, copy paper, and more. OSTI has been Adopt-a-School partner of Norwood Elementary School for

238

OSTI raises $2,400 for Norwood, Dutch Valley, Andersonville, Briceville,  

Office of Scientific and Technical Information (OSTI)

FOR IMMEDIATE RELEASE FOR IMMEDIATE RELEASE February 1, 2006 OSTI raises $2,400 for Norwood, Dutch Valley, Andersonville, Briceville, and Fairview Elementary Schools Oak Ridge, TN - The U.S. Department of Energy (DOE) Office of Scientific and Technical Information (OSTI) raised $2,400 during its recent annual Adopt-A-School auction featuring auctioneer Bear Stevenson. The auction was held at Kern Methodist Church in Oak Ridge and benefits Norwood, Andersonville, Briceville, Dutch Valley, and Fairview Elementary Schools. Supplies were delivered to the schools January 27, and included construction paper, markers, pencils, pens, staplers, paper clips, magic tape, video tape, post-it-notes, tissues, file folders, copy paper, and more. OSTI has been Adopt-a-School partner of Norwood Elementary School for

239

Oak Ridge Opw~tlon~  

Office of Legacy Management (LM)

634 eo.7to 634 eo.7to Department of Energy Oak Ridge Opw~tlon~ P.O. Box 2001 Oak Ridge, Tmnmeea 37Wl- September 27. 1990 ,- __ .._ .- Dr. Frank Bradley Principle Radiophy??t.ist New York State Departront of Labor 1 Main Street Brooklyn, NY 11201 Dear Dr. Bradley: DESIGNATION OF THE FORMER BAKER AND WILLIAMS WAREHOUSES INTO DOE'S FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM The purpose of this letter is to inform you that on August 9, 1990, the site of :;; former Baker and Williams warehouses, currently owned by Ralph Ferrara, located on West 20th Street in New York City, was designated into the Depa;tment of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (WRAP). This information was discussed with Dr. Leonard Solon, Director of the Bureau of Radiation Control, New York City Department of Health, on

240

Oak Ridge Associated Universities II  

Office of Legacy Management (LM)

Prepared by Prepared by Oak Ridge Associated Universities II Prepared for Division of Fuel - Cycle and Material Safety II U.S. Nuclear Regulatory Commission L RADIOLOGICAL SURVEY OF THE W. R. GRACE PROPERTY WAYNE, NEW JERSEY P. W. FRAME Radiological Site Assessment Program Manpower Education, Research, and Training Division FINAL REPORT January 1983 RADIOLOGICAL SURVEY OF THE W.R. GRACE PROPERTY WAYNE, NEW JERSEY Prepared for Division of Fuel Cycle and Material Safety U.S. Nuclear Regulatory Commission P. W. Frame Project Staff J. D. Berger A. J. Liu R. D. Condra A. M. Pitt G. R. Foltz T. J. Sowell J. R. Frazier C. F. Weaver R. C. Gentry T. S. Yoo Prepared by Radiological Site Assessment Program Manpower Education, Research, and Training Division Oak Ridge Associated Universities

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Environmental Assessment for the Oak Ridge Science and Technology Project at the Oak Ridge National Laboratory, Oak Ridge, Tennessee  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81(E)/020508 81(E)/020508 FINDING OF NO SIGNIFICANT IMPACT OAK RIDGE SCIENCE AND TECHNOLOGY PROJECT AT THE OAK RIDGE NATIONAL LABORATORY, OAK RIDGE, TENNESSEE AGENCY: U. S. Department of Energy ACTION: Finding of No Significant Impact. SUMMARY: The U. S. Department of Energy (DOE) has completed an Environmental Assessment (EA) (DOE/EA-1575) for the Oak Ridge Science and Technology Project (ORSTP) at the Oak Ridge National Laboratory (ORNL). The proposed action would advance technology transfer and other missions at ORNL by supporting technology commercialization, creating new companies, and stimulating technology-based recruitment. Funding for the ORSTP would primarily be from private, other federal, and state sources. As a part of the ORSTP, DOE would also establish the Oak Ridge Science and

242

ADEC II Universal SCR Retrofit System for On-road and Off-road...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADEC II Universal SCR Retrofit System for On-road and Off-road Diesel Engines ADEC II Universal SCR Retrofit System for On-road and Off-road Diesel Engines Presentation given at...

243

Oak Ridge National Laboratory - Wireless Networking  

NLE Websites -- All DOE Office Websites (Extended Search)

Oak Ridge National Laboratory Oak Ridge National Laboratory Oak Ridge National Laboratory UT-Battelle U.S. Department of Energy Oak Ridge National Laboratory Oak Ridge National Laboratory Oak Ridge National Laboratory Find People · Contacts · Site Index · Comments Saturday, January 11, 2014 Location right-hand arrow ORNL Home · Visiting ORNL · Wireless Networking Home News About ORNL ORNL Video Science & Technology Spallation Neutron Source User Facilities Technology Transfer Working with ORNL Community Outreach Jobs Visitor Information Calendar of Events University Partners Contact Us Featured Sites Home News About ORNL ORNL Video Science & Technology Spallation Neutron Source User Facilities Technology Transfer Working with ORNL Community Outreach Jobs Visitor Information Calendar of Events

244

DOE/ORO/2119 Oak Ridge Reservation Annual Site  

E-Print Network (OSTI)

#12;#12;DOE/ORO/2119 Oak Ridge Reservation Annual Site Environmental Report for 2000 on the World Technical coordinators L. W. McMahon J. F. Hughes M. L. Coffey Oak Ridge Y-12 Complex Oak Ridge National. Mulkey Date published: September 2001 Prepared by Oak Ridge National Laboratory P.O. Box 2008, Oak Ridge

Pennycook, Steve

245

DOE/ORO/2185 Oak Ridge Reservation Annual Site  

E-Print Network (OSTI)

#12;#12;#12;DOE/ORO/2185 Oak Ridge Reservation Annual Site Environmental Report for 2003 Technical coordinators Wayne McMahon Joan Hughes Mike Coffey Oak Ridge Y-12 Complex Oak Ridge National published: September 2004 Prepared by Oak Ridge National Laboratory P.O. Box 2008, Oak Ridge, TN 37831

Pennycook, Steve

246

DOE/ORO/2159 Oak Ridge Reservation Annual Site  

E-Print Network (OSTI)

#12;#12;DOE/ORO/2159 Oak Ridge Reservation Annual Site Environmental Report for 2002 on the World Technical coordinators Wayne McMahon Joan Hughes Mike Coffey Oak Ridge Y-12 Complex Oak Ridge National: September 2003 Prepared by Oak Ridge National Laboratory P.O. Box 2008, Oak Ridge, TN 37831-2008 Managed

Pennycook, Steve

247

OAK RIDGE NATIONAL LABORATORY U.S. DEPARTMENT OF ENERGY  

E-Print Network (OSTI)

1 OAK RIDGE NATIONAL LABORATORY U.S. DEPARTMENT OF ENERGY OAK RIDGE NATIONAL LABORATORY U.S. DEPARTMENT OF ENERGY OAK RIDGE NATIONAL LABORATORY U.S. DEPARTMENT OF ENERGY BPWorkshop-2005 - LRB OAK RIDGE.K. Combs, W.A. Houlberg, T.C. Jernigan, S. Maruyama#, L.W. Owen, G.L. Schmidt, D.A. Rasmussen Oak Ridge

248

DOE/ORO/2218 Oak Ridge Reservation Annual Site  

E-Print Network (OSTI)

#12;#12;#12;DOE/ORO/2218 Oak Ridge Reservation Annual Site Environmental Report for 2005 Technical coordinators Wayne McMahon Joan Hughes Mike Coffey Oak Ridge Y-12 Complex Oak Ridge National: September 2006 Prepared by Oak Ridge National Laboratory P.O. Box 2008, Oak Ridge, TN 37831-2008 Managed

Pennycook, Steve

249

Sally Johnson 123 Bakers Road  

E-Print Network (OSTI)

Sally Johnson 123 Bakers Road Nashville, TN 37212 203-333-4444 Sally.johnson@vanderbilt.edu Leslie. Sincerely, (signature) Sally Johnson #12;

Bordenstein, Seth

250

MONUMENT VALLEY, ARIZONA  

Office of Legacy Management (LM)

VALLEY, ARIZONA VALLEY, ARIZONA Sampled August 1997 DATA PACKAGE CONTENTS This data package includes the following information: Item No. Descriotion of Contents 1. Site Sampling Lead Summary 2. Data Package Assessment, which includes the following: a. Field procedures verification checklist b. Confirmation that chain-of-custody was maintained. c. Confirmation that holding time requirements were met. d. Evaluation of the adequacy of the QC sample results. Data Assessment Summary, which describes problems identified in the data validation process and summarizes the validator's findings. Suspected Anomalies Reports generated by the UMTRA database system. This report compares the new data $et with historical data and designates "suspected anomalies" based on the many criteria listed as footnotes on each page. In

251

monument valley.cdr  

Office of Legacy Management (LM)

The Monument Valley processing site is located on the The Monument Valley processing site is located on the Navajo Nation in northeastern Arizona, about 15 miles south of Mexican Hat, Utah. A uranium-ore-processing mill operated at the site from 1955 to 1968 on property leased from the Navajo Nation. The mill closed in 1968, and control of the site reverted to the Navajo Nation. Most of the mill buildings were removed shortly thereafter. The milling process produced radioactive mill tailings, a predominantly sandy material. From 1955 until 1964, ore at the site was processed by mechanical milling using an upgrader, which crushed the ore and separated it by grain size. The finer-grained material, which was higher in uranium content, was shipped to other mills for chemical processing. Coarser-grained material was stored on site.

252

Chief Financial Officer, Oak Ridge Office  

Energy.gov (U.S. Department of Energy (DOE))

A successful candidate in this position will serve as the Chief Financial Officer, Oak Ridge Office, providing overall executive leadership for financial management, budgeting, contractor...

253

Oak Ridge Site Specific Advisory Board Committees  

Energy.gov (U.S. Department of Energy (DOE))

Oak Ridges Site Specific Advisory Board uses its committee structure to achieve its mission and conduct many of its tasks.

254

Oak Ridge National Laboratory - Physical Sciences Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

Physics The Physics Division of Oak Ridge National Laboratory is concerned primarily with studies of the fundamental properties of matter at the atomic, nuclear, and subnuclear...

255

Oak Ridge National Laboratory - Global Security Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

the proliferation of nuclear weapons, technologies that make America safer are among Oak Ridge National Laboratory's top research priorities. The Laboratory provides federal,...

256

Oak Ridge Site Specific Advisory Board  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 12, 2014, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (D. Hemelright) ......

257

Oak Ridge Hotels | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Conferences Highlights Success Stories Contact Us Index Home | ORNL | Visiting ORNL SHARE Oak Ridge Hotels Contact information for local hotels is listed below. At ORNL Hotel...

258

Oak Ridge - A Center of Innovation & Technology  

NLE Websites -- All DOE Office Websites (Extended Search)

facilities, equipment, personnel and technology available at the Department of Energy's Oak Ridge complex. Transforming Liabilities into Community Assets In the lead article of...

259

Oak Ridge Site Specific Advisory Board  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on Additional Off-site Groundwater Migration Studies At our May 14, 2014, meeting, the Oak Ridge Site Specific Advisory Board approved the enclosed recommendations on additional...

260

Oak Ridge Centers for Manufacturing Technology - Partnership...  

NLE Websites -- All DOE Office Websites (Extended Search)

in result from Jack Cook making contacts with some of the people who experienced the Oak Ridge Centers for Manufacturing Technology firsthand. Here is his introduction...

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Oak Ridge National Laboratory Site Office Jobs  

NLE Websites -- All DOE Office Websites (Extended Search)

Title: Industrial Security Specialst
DOE 15 ORO RCG 4927
Office: Oak Ridge National Laboratory Site Office
URL:

262

Oak Ridge National Laboratory - User Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

User Facilities Oak Ridge National Laboratory is home to a number of highly sophisticated experimental user facilities. These research laboratories are designed to serve staff...

263

ORISE: Oak Ridge Sitewide Institutional Review Board  

NLE Websites -- All DOE Office Websites (Extended Search)

Oak Ridge Sitewide Institutional Review Board The Federal Policy for the Protection of Human Subjects, also known as the Common Rule, requires that each institution that engages in...

264

Oak Ridge Reservation's emergency sectors change | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reservation's emergency sectors change Oak Ridge Reservation's emergency sectors change March 11, 2014 - 11:30am Addthis On March 12, the Tennessee Emergency Management Agency...

265

Oak Ridge Critical Experiment Facility (Building 9213)  

NLE Websites -- All DOE Office Websites (Extended Search)

9213) Joe Lenhard, retired Department of Energy official, had responsibility for the Oak Ridge Critical Experi- ment Facility. Joe has continued to hold up this facility as...

266

Oak Ridge Site Specific Advisory Board  

Office of Environmental Management (EM)

January 14, 2015, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (D. Hemelright) ......

267

Oak Ridge National Laboratory Manufacturing Demonstration Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Oak Ridge National Laboratory Manufacturing Demonstration Facility Technology Collaborations | Proposal Guidelines Proposal Guidelines Proposals should be no more than 5 single...

268

Oak Ridge Centers for Manufacturing Technology ? testimonials  

NLE Websites -- All DOE Office Websites (Extended Search)

testimonials The first testimonial for the successful Oak Ridge Centers for Manufacturing Technology came from Mitchell Burnett. Mitch was among the first hourly paid employees, an...

269

Blue Oak Energy Inc | Open Energy Information  

Open Energy Info (EERE)

California Zip: 95618 Sector: Services Product: Focused on PV system design, planning, engineering, testing and commissioning services. References: Blue Oak Energy Inc1 This...

270

USAEC, David Lilienthal and Oak Ridge  

NLE Websites -- All DOE Office Websites (Extended Search)

Ridge While Oak Ridge and Hanford continued to produce nuclear materials, significant discussion about how to control atomic energy continued. The drift from an early desire for...

271

Sundial Substation Site Baxter Road Substation Site Casey Road  

NLE Websites -- All DOE Office Websites (Extended Search)

Sundial Substation Site Baxter Road Substation Site Casey Road Substation Site Monahan Creek Substation Site YALE DAM MERWIN DAM S i l v e r L a k e Lake Merwin Y a l e L a k e V a...

272

ROAD POLISHING ASSESSMENT METHODOLOGY (TROWS) PIARC XXIIND WORLD ROAD CONGRESS  

E-Print Network (OSTI)

depend non-linearly on numerous parameters, like materials used, vehicle and road usage, environmental conditions (e.g., temperature) and many others. Due to their many economic and ecological implications in the same test conditions. On the road circuit, Passenger Car (PC) and Heavy Goods Vehicle (HGV) equipped

Paris-Sud XI, Université de

273

LVOC - Livermore Valley Open Campus  

NLE Websites -- All DOE Office Websites (Extended Search)

LVOC - Livermore Valley Open Campus LVOC - Livermore Valley Open Campus ↓ Case Studies | ↓ About LVOC Get to market faster Making the impossible possible Lawrence Livermore and Sandia National Laboratories are home to some of the world's most unique state-of-the art facilities and resources. For decades, we have been using our combined capabilities, including a workforce of over 7000 employees to solve complex problems for the nation. Visit the science and technology epicenter - the Livermore Valley Open Campus - just east of San Francisco in the Tri-Valley's innovation ecosystem to find out what problems we can solve for you. LVOC Flyer We Keep Industry on the Cutting Edge of Innovative Technology About the Livermore Valley Open Campus LVOC Rendering Open for Business: The Livermore Valley Open Campus is located at the

274

EM's Oak Ridge Office Launches New Website | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge Office Launches New Website EM's Oak Ridge Office Launches New Website February 6, 2014 - 12:00pm Addthis The Oak Ridge Office of Environmental Management's new website,...

275

Area Lodging: Oak Ridge | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

Oak Ridge Area Lodging: Oak Ridge Comfort Inn 433 South Rutgers Avenue Oak Ridge, TN 37830 865.481.8200 (1.800.228.5150) fax 865.483.6142 1.2 miles from Y-12 Corporate Quarters,...

276

Follow-up Review, Oak Ridge National Laboratory - December 2001...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Follow-up Review, Oak Ridge National Laboratory - December 2001 Follow-up Review, Oak Ridge National Laboratory - December 2001 December 2001 Follow-up Review of the Oak Ridge...

277

Recommendation 178: FY 2011 DOE Oak Ridge EM Budget Request ...  

Office of Environmental Management (EM)

78: FY 2011 DOE Oak Ridge EM Budget Request Recommendation 178: FY 2011 DOE Oak Ridge EM Budget Request At our April 8, 2009, meeting, the Oak Ridge Site Specific Advisory Board...

278

Oak Ridge's EM Program Realizes Successful 2010 | Department...  

Office of Environmental Management (EM)

2010 Oak Ridge's EM Program Realizes Successful 2010 February 7, 2011 - 12:00pm Addthis OAK RIDGE, Tenn. - Cleanup at the Oak Ridge Reservation took a major leap forward in 2010,...

279

Incinerator Completes Mission in Oak Ridge | Department of Energy  

Office of Environmental Management (EM)

Incinerator Completes Mission in Oak Ridge Incinerator Completes Mission in Oak Ridge December 1, 2009 - 12:00pm Addthis OAK RIDGE, Tenn. - After more than 18 years of operation...

280

Recommendation 209 : FY 2014 DOE Oak Ridge EM Budget Request...  

Office of Environmental Management (EM)

9 : FY 2014 DOE Oak Ridge EM Budget Request Recommendation 209 : FY 2014 DOE Oak Ridge EM Budget Request At the April 11, 2012, meeting, the Oak Ridge Site Specific Advisory Board...

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Recommendation 216: FY 2015 DOE Oak Ridge EM Budget Request ...  

Office of Environmental Management (EM)

6: FY 2015 DOE Oak Ridge EM Budget Request Recommendation 216: FY 2015 DOE Oak Ridge EM Budget Request At the May 8, 2013, meeting, the Oak Ridge Site Specific Advisory Board...

282

Federal Facility Agreement (FFA) Signed at Oak Ridge | Department...  

Office of Environmental Management (EM)

Federal Facility Agreement (FFA) Signed at Oak Ridge Federal Facility Agreement (FFA) Signed at Oak Ridge The Oak Ridge Reservation FFA was implemented on January 1, 1992. It is a...

283

Oak Ridge Site Specific Advisory Board Contacts | Department...  

Office of Environmental Management (EM)

Contacts Oak Ridge Site Specific Advisory Board Contacts Mailing Address Oak Ridge Site Specific Advisory Board P.O. Box 2001, EM-91 Oak Ridge, TN 37831 Phone Numbers (865)...

284

Climate Change Science Institute at Oak Ridge National Laboratory  

E-Print Network (OSTI)

Climate Change Science Institute at Oak Ridge National Laboratory A multidisciplinary research fields. The Climate Change Science Institute at Oak Ridge National Laboratory routinely partners simulations to improve regional modeling of climate extremes - Partners from Oak Ridge, Lawrence Berkeley

285

Recommendation 197: FY 2013 DOE Oak Ridge EM Budget Request ...  

Office of Environmental Management (EM)

7: FY 2013 DOE Oak Ridge EM Budget Request Recommendation 197: FY 2013 DOE Oak Ridge EM Budget Request At the May 26, 2011, meeting, the Oak Ridge Site Specific Advisory Board...

286

Diesel Engines for Road Transport  

Science Journals Connector (OSTI)

... A REMARKABLE revolution is taking place in the type of engine used in large motor vehicles, and by some it is thought that for road ... motor vehicles, and by some it is thought that for road transport the highspeed oil engine is destined to supersede the long-favoured petrol ...

1933-10-21T23:59:59.000Z

287

Categorical Exclusion for Access Road  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Access Road Access Road Improvements along the Pinnacle Peak- Prescott 230-kV Transmission Line between Structures 16813 and 170/1 Yavapai County. Arizona * RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to improve access roads along a portion of the Pinnacle Peak to Prescott 230-kV Transmission Line (Structures 168/3 and 170/1). which are currently impassable. to maintain worker safety and the reliability of the bulk electric system. Western plans to blade and grade the existing access road where it enters and leaves three washes so that Western's maintenance vehicles can drive across the washes. We will remove dirt from the road prism by starting at wash edges and pulling dirt up slope in order to create ramps with grades suitable for our equipment.

288

Oak Ridge Office CX Determinations | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Office CX Determinations Office CX Determinations Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act Categorical Exclusion Determinations Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Larry Kelly U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-0885 Categorical Exclusion (CX) Determinations Oak Ridge Office CX Determinations Print Text Size: A A A RSS Feeds FeedbackShare Page Categorical Exclusion Determination Documents (CX Determinations): * Determination Date Name of Action: Description Categorical Exclusion Number External link 09/25/2013 Office of Secure Transportation Multiple Actions (CX-ORR-13-009) .pdf file (65KB) B1.2, B1.3, B1.11, B1.15

289

2012 Annual Workforce Analysis and Staffing Plan Report - Oak...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Oak Ridge Office of Environmental Management 2012 Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office of Environmental Management Managers perform an annual...

290

2013 Annual Workforce Analysis and Staffing Plan Report - Oak...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

3 Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office of Environmental Management 2013 Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office of...

291

DOE Awards $3 Million Contract to Oak Ridge Associated Universities...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Million Contract to Oak Ridge Associated Universities for Expert Review of Yucca Mountain Work DOE Awards 3 Million Contract to Oak Ridge Associated Universities for Expert...

292

PIA - Oak Ridge Institute for Science and Education Program Applicant...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Oak Ridge Institute for Science and Education Program Applicant and Participant Status System (APSS) PIA - Oak Ridge Institute for Science and Education Program Applicant and...

293

Oak Ridge Operations Office of Environmental Management Overview...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Environmental Management Overview Oak Ridge Operations Office of Environmental Management Overview Oak Ridge Operations Office of Environmental Management Overview More...

294

ORO Verification of Employment Tracking System(VETS) PIA, Oak...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office ORO Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office ORO...

295

Oak Ridge Site Specific Advisory Board | Department of Energy  

Energy Savers (EERE)

Engagement Oak Ridge Site Specific Advisory Board Oak Ridge Site Specific Advisory Board 2014 ORSSAB board members are pictured with representatives from DOE and TDEC. 2014...

296

2011 Annual Workforce Analysis and Staffing Plan Report - Oak...  

Office of Environmental Management (EM)

1 Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office 2011 Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office Managers perform an annual...

297

CRAD, Radiological Controls - Oak Ridge National Laboratory TRU...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Radiological Controls - Oak Ridge National Laboratory TRU ALPHA LLWT Project CRAD, Radiological Controls - Oak Ridge National Laboratory TRU ALPHA LLWT Project November 2003 A...

298

Improvements to the Oak Ridge National Laboratory Beryllium Program...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Improvements to the Oak Ridge National Laboratory Beryllium Program Improvements to the Oak Ridge National Laboratory Beryllium Program August 2009 Presenter: Kevin Petherick,...

299

CRAD, Fire Protection - Oak Ridge National Laboratory High Flux...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fire Protection - Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Fire Protection - Oak Ridge National Laboratory High Flux Isotope Reactor February 2006 A section of...

300

Oak Ridge City Center Technology Demonstration Project | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge City Center Technology Demonstration Project Oak Ridge City Center Technology Demonstration Project Project objectives: To broaden market understanding of large-scale...

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

DOE Issues Final Request for Proposal for Oak Ridge Transuranic...  

Office of Environmental Management (EM)

Oak Ridge Transuranic Waste Processing Center Services DOE Issues Final Request for Proposal for Oak Ridge Transuranic Waste Processing Center Services October 14, 2014 - 2:16pm...

302

CRAD, Engineering - Oak Ridge National Laboratory High Flux Isotope...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Engineering - Oak Ridge National Laboratory High Flux Isotope Reactor February 2007 A section of Appendix C to DOE G...

303

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor February 2007 A section of...

304

The Oak Ridge Institute for Science and Education Human Subjects...  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview Forms Membership List Operating Procedures (pdf) "How to" for PIs (pdf) The Oak Ridge Institute for Science and Education (ORISE) Human Subjects Research Program Oak...

305

DOE - Office of Legacy Management -- Oak Ridge Gaseous Diffusion...  

Office of Legacy Management (LM)

Oak Ridge Gaseous Diffusion Plant - TN 02 FUSRAP Considered Sites Site: Oak Ridge Gaseous Diffusion Plant (TN.02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site...

306

Uraninum-233 Inventory in Oak Ridge Lightened with First Shipment...  

Office of Environmental Management (EM)

Uraninum-233 Inventory in Oak Ridge Lightened with First Shipment of Material from Building 3019 Uraninum-233 Inventory in Oak Ridge Lightened with First Shipment of Material from...

307

2013 Annual Planning Summary for the Oak Ridge Office | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

3 Annual Planning Summary for the Oak Ridge Office 2013 Annual Planning Summary for the Oak Ridge Office The ongoing and projected Environmental Assessments and Environmental...

308

Independent Activity Report, Oak Ridge Office - June 2011 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office - June 2011 Independent Activity Report, Oak Ridge Office - June 2011 June 2011 Review of the Oak Ridge Office FY 2012 Draft Schedules for Oversight Activities...

309

CRAD, Emergency Management - Oak Ridge National Laboratory High...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergency Management - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR CRAD, Emergency Management - Oak Ridge National Laboratory High Flux Isotope Reactor...

310

CRAD, Emergency Management - Oak Ridge National Laboratory High...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergency Management - Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Emergency Management - Oak Ridge National Laboratory High Flux Isotope Reactor February 2007 A...

311

2013 Federal Energy and Water Management Award Winner Oak Ridge...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2013 Federal Energy and Water Management Award Winner Oak Ridge National Laboratory 2013 Federal Energy and Water Management Award Winner Oak Ridge National Laboratory Poster...

312

Oak Ridge Micro Energy Inc | Open Energy Information  

Open Energy Info (EERE)

Inc Jump to: navigation, search Name: Oak Ridge Micro-Energy Inc Place: Oak Ridge, Tennessee Zip: 37830 Product: Developer and producer of thin film rechargeable lithium and...

313

CRAD, Nuclear Safety - Oak Ridge National Laboratory High Flux...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Safety - Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Nuclear Safety - Oak Ridge National Laboratory High Flux Isotope Reactor February 2007 A section of...

314

CRAD, Safety Basis - Oak Ridge National Laboratory High Flux...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR CRAD, Safety Basis - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR February 2007 A...

315

CRAD, Safety Basis - Oak Ridge National Laboratory TRU ALPHA...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety Basis - Oak Ridge National Laboratory TRU ALPHA LLWT Project CRAD, Safety Basis - Oak Ridge National Laboratory TRU ALPHA LLWT Project November 2003 A section of Appendix C...

316

CRAD, Quality Assurance - Oak Ridge National Laboratory TRU ALPHA...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quality Assurance - Oak Ridge National Laboratory TRU ALPHA LLWT Project CRAD, Quality Assurance - Oak Ridge National Laboratory TRU ALPHA LLWT Project November 2003 A section of...

317

Independent Oversight Targeted Review, Oak Ridge National Laboratory...  

Office of Environmental Management (EM)

Targeted Review, Oak Ridge National Laboratory - April 2014 Independent Oversight Targeted Review, Oak Ridge National Laboratory - April 2014 April 2014 Targeted Review of...

318

CRAD, Management - Oak Ridge National Laboratory TRU ALPHA LLWT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management - Oak Ridge National Laboratory TRU ALPHA LLWT Project CRAD, Management - Oak Ridge National Laboratory TRU ALPHA LLWT Project November 2003 A section of Appendix C to...

319

Former Oak Ridge Bechtel Jacobs Employee Charged with Violating...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Former Oak Ridge Bechtel Jacobs Employee Charged with Violating Atomic Energy Act Former Oak Ridge Bechtel Jacobs Employee Charged with Violating Atomic Energy Act Department of...

320

CRAD, Engineering - Oak Ridge National Laboratory High Flux Isotope...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Engineering - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR CRAD, Engineering - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR...

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Energy Department, Oak Ridge National Lab Officials to Celebrate...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Department, Oak Ridge National Lab Officials to Celebrate First of its Kind Carbon Fiber Facility Energy Department, Oak Ridge National Lab Officials to Celebrate First of its Kind...

322

Other: Advancing Materials Science using Neutrons at Oak Ridge...  

Office of Scientific and Technical Information (OSTI)

Advancing Materials Science using Neutrons at Oak Ridge National Laboratory Citation Details Title: Advancing Materials Science using Neutrons at Oak Ridge National Laboratory...

323

Oak Ridge Site Specific Advisory Board Committees | Department...  

Office of Environmental Management (EM)

Committees Oak Ridge Site Specific Advisory Board Committees Oak Ridge's Site Specific Advisory Board uses its committee structure to achieve its mission and conduct many of its...

324

CRAD, Radiological Controls - Oak Ridge National Laboratory High...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Radiological Controls - Oak Ridge National Laboratory High Flux Isotope Reactor February 2007 A section of Appendix C...

325

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR...

326

CRAD, Management- Oak Ridge National Laboratory High Flux Isotope...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management- Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Management- Oak Ridge National Laboratory High Flux Isotope Reactor February 2007 A section of Appendix C...

327

Recommendation 224: Recommendations on the FY 2016 DOE Oak Ridge...  

Office of Environmental Management (EM)

Recommendation 224: Recommendations on the FY 2016 DOE Oak Ridge Environmental Management Budget Request Recommendation 224: Recommendations on the FY 2016 DOE Oak Ridge...

328

CHP Research and Development - Presentation by Oak Ridge National...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CHP Research and Development - Presentation by Oak Ridge National Laboratory, June 2011 CHP Research and Development - Presentation by Oak Ridge National Laboratory, June 2011...

329

Energy Department, Oak Ridge National Lab Officials to Celebrate...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Energy Department, Oak Ridge National Lab Officials to Celebrate First of its Kind Carbon Fiber Facility Energy Department, Oak Ridge National Lab Officials to Celebrate First of...

330

CRAD, Conduct of Operations - Oak Ridge National Laboratory High...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR CRAD, Conduct of Operations - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR February...

331

CRAD, Conduct of Operations - Oak Ridge National Laboratory TRU...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Conduct of Operations - Oak Ridge National Laboratory TRU ALPHA LLWT Project CRAD, Conduct of Operations - Oak Ridge National Laboratory TRU ALPHA LLWT Project November 2003 A...

332

CRAD, Occupational Safety & Health - Oak Ridge National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Occupational Safety & Health - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR CRAD, Occupational Safety & Health - Oak Ridge National Laboratory High Flux...

333

CRAD, Occupational Safety & Health - Oak Ridge National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Occupational Safety & Health - Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Occupational Safety & Health - Oak Ridge National Laboratory High Flux Isotope Reactor...

334

Oak Ridge recognized for bird protection practices  

Energy.gov (U.S. Department of Energy (DOE))

Oak Ridges efforts to protect migratory birds recently garnered honorable mention for the 2013 Presidential Migratory Bird Federal Stewardship Award. The Energy Department championed the effort through partnerships with the Tennessee Wildlife Resources Agency, UT-Battelle, and URS | CH2M Oak Ridge.

335

Oak Ridge Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE))

This website highlights activities that support the mission of the Oak Ridge Office of Environmental Management (Oak Ridge Office of EM), which is to remove environmental legacies resulting from more than 60 years of nuclear weapons development and government-sponsored nuclear energy and scientific research.

336

Record Series Descriptions: Oak Ridge Sites  

NLE Websites -- All DOE Office Websites (Extended Search)

Oak Ridge Sites Oak Ridge Sites AEC Manager's Meetings Files Classification Office Files Contract Division Insurance Files Chief Counsel Office, Subject Files Decatur Area Office Files Feed Materials Division, Lockland Area Office, and Personnel Files Finance Division Files Individual Injury Reports and Medical File Various MED Areas Industrial Personnel Relations Files Injury and Compensation Claim Files Joseph A. Lenhard Reading File K-25 Insurance Branch Files New Brunswick Area Office Files New York Operations Office Files New York Operations Office Contract Files Oak Ridge Contract Files Oak Ridge Manger's Files Public Information Office Files Periodic Progress Reports (Oak Ridge Copy) Personal Insurance Record Cards R.W. Cook Office Files Records Holding Task Group (RHTG) Files

337

Independent Activity Report, West Valley Demonstration Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 2011 Independent Activity Report, West Valley Demonstration Project - November 2011 November 2011 West Valley Demonstration Project Orientation Visit HIAR-WVDP-2011-11-07...

338

Thanksgiving Goodwill: West Valley Demonstration Project Food...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Thanksgiving Goodwill: West Valley Demonstration Project Food Drive Provides 640 Turkeys to People in Need Thanksgiving Goodwill: West Valley Demonstration Project Food Drive...

339

Independent Activity Report, West Valley Demonstration Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 2012 Independent Activity Report, West Valley Demonstration Project - July 2012 July 2012 Operational Awareness Oversight of the West Valley Demonstration Project HIAR...

340

Aire Valley Environmental | Open Energy Information  

Open Energy Info (EERE)

search Name: Aire Valley Environmental Place: United Kingdom Product: Leeds-based waste-to-energy project developer. References: Aire Valley Environmental1 This article...

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

The silhouette of valley oaks (Quercus lobata) in tule fog in Sonoma County's Valley of the Moon. Photograph by David Cavagnaro. SAVING SOMEONE ELSE'S OAKS  

E-Print Network (OSTI)

-year program of extensive education, research, and monitoring to ad- dress concerns about the sustainability. The owners of large ranching properties have often held the land for more than one generation, and take pride

Standiford, Richard B.

342

Genetic variation in post-epidemic and pre-epidemic live oak populations subject to oak wilt  

E-Print Network (OSTI)

when challenged by the oak wilt pathogen. White oaks are known to be more resistant to oak Journal used for style and format is Phytopathology. wilt, and rarely die from the disease, presumably due to differences in anatomy and/or responses... half of the white oaks have vessels similar to those found in red oaks. He also reported that tyloses are frequent in the vessels of white oaks, while they are rare in the summerwood vessels of red oaks; "live oaks" usually have no tyloses present...

Bellamy, Brenda Kay

2012-06-07T23:59:59.000Z

343

Voluntary Protection Program Onsite Review, Oak Ridge Associated Universities, Oak Ridge Institute for Science and Education- October 2011  

Energy.gov (U.S. Department of Energy (DOE))

Evaluation to determine whether Oak Ridge Associated Universities, Oak Ridge Institute for Science and Education is continuing to perform at a level deserving DOE-VPP Star recognition.

344

Voluntary Protection Program Onsite Review, Oak Ridge Associated Universities Oak Ridge Institute for Science and Education- April 2008  

Energy.gov (U.S. Department of Energy (DOE))

Evaluation to determine whether Oak Ridge Associated Universities Oak Ridge Institute for Science and Education is continuing to perform at a level deserving DOE-VPP Star recognition.

345

Solar homes for the valley  

SciTech Connect

TVA has designed 11 passive solar homes in the public interest to encourage the development of solar housing in the Tennessee Valley region. The program, Solar Homes For The Valley, involves the design, construction, and testing of the 11 designs in each of four microclimatic areas within the region, (total of 44 homes).

Born, B.; Brewer, D.

1980-01-01T23:59:59.000Z

346

GEO Imperial Valley activities  

SciTech Connect

Geothermal Resources International, Inc. (GEO) in San Mateo, California, and PacifiCorp Credit, a subsidiary of PacifiCorp in Portland, Oregon, announced that since July 1987, the company has raised about $21 million to fund the initial development of GEO's East Mesa project. GEO will use a portion of the funds to meet its commitment to share in the cost of a $50 million, 230-kilovolt transmission line. The line will carry electricity generated from geothermal power plants in the Imperial Valley to a Southern California Edison substation in Riverside County, California. In September 1987, two GEO geothermal wells at East Mesa were completed, and GEO was drilling its third and fourth wells in the field. Test data results from these wells will be analyzed to decide whether GEO will construct a dual-flash or binary power plant. GEO has the geothermal rights on about 300,000 acres in five western states. In addition to its operations and development projects in The Geysers and the Imperial Valley, the company is continuing exploration projects on the flanks of the Newberry Crater in Central Oregon and in Hokkaido, Japan. GEO also has an international geotechnical service group in the United Kingdom, GeoScience Ltd., which provides geotechnical services to clients around the world and to the company's geothermal operations.

Not Available

1987-07-01T23:59:59.000Z

347

The Australasian College of Road Safety Road Safety 2020: Smart Solutions, Sustainability, Vision, Conference Proceedings, 5-6 November 2009  

E-Print Network (OSTI)

The Australasian College of Road Safety Road Safety 2020: Smart Solutions, Sustainability, Vision Solutions, Sustainability, Vision The Australasian College of Road Safety Conference, Perth, Western Australia : Australia (2009)" #12;The Australasian College of Road Safety Road Safety 2020: Smart Solutions

Paris-Sud XI, Université de

348

Plants of Ornamental Value for the Rio Grande Valley of Texas.  

E-Print Network (OSTI)

, Phoenix cannriensis, Cocos australis, Phoenix Roebelenii and Cycas revoluta thrive to perfection in the Lower Rio Grande Valley. The stately fan palms and the graceful Phoenix and Cocos palms may be used for avenue planting (Figure I), in group... plantings at the end of roads, or to give height to mass plantings of the more dwarf types of plants. The dwarf forms such as Cocos australis, Phoenix Roebelenii and Cycas revo- Zutn are especially useful for small group plantings. Most palms...

Friend, W. H. (William Heartsill)

1942-01-01T23:59:59.000Z

349

Isotope Work at Oak Ridge  

Science Journals Connector (OSTI)

The special training division of the Oak Ridge Institute of Nuclear Studies has announced that three additional courses in the techniques of using radioisotopes in research have been scheduled during the winter and spring of 1951. They are to be held from January 8th to February 2nd from February 19th to March 16th and from April 16th to May 11th. Designed to acquaint research workers with the safe and efficient use of radioisotopes the courses include laboratory work lectures and special?topic seminars. Experiments cover such matters as the use and calibration of instruments purification and separation of radioactive materials from inert and other radioactive materials and pile activation technology. The seminars cover various biological and medical uses of radioisotopes and the design of radiochemical laboratories.

C. P. Keim; H. W. Savage; Boyd Weaver

1951-01-01T23:59:59.000Z

350

VNG's Hampton Roads Pipeline Crossing  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VNG's Hampton Roads Pipeline Crossing VNG's Hampton Roads Pipeline Crossing FUPWG Conference Fall 2008 Williamsburg, Virginia Connection to DTI at Quantico Columbia Limitations South Hampton Roads served by a single pipeline Southside dependent on back up systems LNG Propane/air Two supply sources to VNG What if we connected pipelines? It would take Two Water Crossings Two Compressor Stations Construction in densely populated cities It could Deliver over 200,000 Dth of incremental supply Serve VNG, Columbia and Dominion customers ...we would get... Hampton Roads Crossing - HRX Hampton / Newport News Craney Island Norfolk 21 miles of 24" pipe 7 miles in Hampton/Newport News 4 miles in Norfolk 10 miles of water and island crossing 4 mile harbor crossing 4.5 miles on Craney

351

Tunnels for roads and motorways  

Science Journals Connector (OSTI)

...compromise. Such a solution also offers no protection to pedestrians and tunnel service personnel; this is a consideration...unit length of the tunnel but also its extent from portal to portal. Whereas motorways and trunk roads usually tolerate...

Alan Marshall Muir Wood

352

RESTRICTED ACCESS to Groat Road  

E-Print Network (OSTI)

AveUniversity Ave University Ave South Ave 80 Ave 82 Ave Braithwaite Park North Saskatchewan River Mc Ave Edinboro Road Saskatchewan Drive Saskatchewan Drive Saskatchewan Drive 88 Corbett Field West

MacMillan, Andrew

353

Analysis Activities at Oak Ridge National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Oak Ridge National Laboratory Oak Ridge National Laboratory David L. Greene Engineering Science and Technology Division Paul N. Leiby Environmental Sciences Division Juan Ferrada Nuclear Science and Technology Division DOE Hydrogen, Fuel Cells, and Infrastructure Technologies Program Systems Analysis Workshop July 28-29, 2004 Washington, D.C. 2 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Charter * The Engineering Science and Technology Division, National Transportation Research Center conducts engineering and analytical R&D for DOE, other federal sponsors and the private sector. * The Environmental Sciences Division conducts interdisciplinary research, develops technology, and performs analyses to understand and assess responses to global and regional change, environmental stress, and resource use.

354

Remedial investigation report on waste area grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 4, Appendix C, Risk assessment  

SciTech Connect

Waste Area Grouping (WAG) 5 is part of Oak Ridge National Laboratory (ORNL) and is located on the United States Department of Energy`s Oak Ridge Reservation (DOE-ORR). The site lies southeast of Haw Ridge in Melton Valley and comprises approximately 32 ha (80 ac) [12 ha (30 ac) of forested area and the balance in grassed fields]. Waste Area Grouping 5 consists of several contaminant source areas for the disposal of low-level radioactive, transuranic (TRU), and fissile wastes (1959 to 1973) as well as inorganic and organic chemical wastes. Wastes were buried in trenches and auger holes. Radionuclides from buried wastes are being transported by shallow groundwater to Melton Branch and White Oak Creek. Different chemicals of potential concern (COPCs) were identified (e.g., cesium-137, strontium-90, radium-226, thorium-228, etc.); other constituents and chemicals, such as vinyl chloride, bis(2-ethylhexyl)phthalate, trichloroethene, were also identified as COPCs. Based on the results of this assessment contaminants of concern (COCs) were subsequently identified. The objectives of the WAG 5 Baseline Human Health Risk Assessment (BHHRA) are to document the potential health hazards (i.e., risks) that may result from contaminants on or released from the site and provide information necessary for reaching informed remedial decisions. As part of the DOE-Oak Ridge Operations (ORO), ORNL and its associated waste/contamination sites fall under the auspices of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), also known as Superfund under the Superfund Amendments and Reauthorization Act (SARA). The results of the BHHRA will (1) document and evaluate risks to human health, (2) help determine the need for remedial action, (3) determine chemical concentrations protective of current and future human receptors, and (4) help select and compare various remedial alternatives.

NONE

1995-09-01T23:59:59.000Z

355

Oak Ridge ReseRvatiOn DOE/ORO/2379  

E-Print Network (OSTI)

Oak Ridge ReseRvatiOn DOE/ORO/2379 Annual Site Environmental Report 2010 #12;Cover Image and Design Creative Media Human Resources and Communications Oak Ridge National Laboratory The Oak Ridge Reservation Annual Site Environmental Report 2010 #12;DOE/ORO/2379 Oak Ridge Reservation Annual Site Environmental

Pennycook, Steve

356

OAK RIDGE ORNL/TM-2008/ NATIONAL LABORATORY  

E-Print Network (OSTI)

OAK RIDGE ORNL/TM-2008/ NATIONAL LABORATORY MANAGED BY UT-BATTELLE FOR THE DEPARTMENT OF ENERGY. Leggett K. F. Eckerman Oak Ridge National Laboratory Oak Ridge, Tennessee 37831 #12;DOCUMENT AVAILABILITY: Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831 Telephone: 865

Pennycook, Steve

357

15 April 2005 Christian Engelmann, Oak Ridge National Laboratory  

E-Print Network (OSTI)

15 April 2005 Christian Engelmann, Oak Ridge National Laboratory High Availability for Ultra Christian Engelmann Oak Ridge National Laboratory #12;15 April 2005 Christian Engelmann, Oak Ridge National. " Computer science at Oak Ridge National Laboratory. " Ultra-scale high-end scientific computing. " High

Engelmann, Christian

358

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY  

E-Print Network (OSTI)

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Fusion Materials Research Steve Zinkle Materials Science & Technology Division Oak Ridge National Laboratory, Oak Ridge, TN Fusion Power Associates Annual Meeting Fusion Energy: Preparing for the NIF and ITER Era Oak Ridge, TN, December 4-5, 2007

359

OAK RIDGE ORNL/TM-2006/583 NATIONAL LABORATORY  

E-Print Network (OSTI)

OAK RIDGE ORNL/TM-2006/583 NATIONAL LABORATORY MANAGED BY UT-BATTELLE FOR THE DEPARTMENT OF ENERGY Agency Washington, DC 20460 b Oak Ridge National Laboratory Oak Ridge, Tennessee 37831 #12;DOCUMENT: Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831 Telephone: 865

360

Statement of Thomas E. Mason Director, Oak Ridge National Laboratory  

E-Print Network (OSTI)

Statement of Thomas E. Mason Director, Oak Ridge National Laboratory Before the Subcommittee Director of the U.S. Department of Energy's Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee, the Oak Ridge fusion program has drawn on the diverse resources afforded by ORNL's standing

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

West Virginia University 1 Oak Ridge Associated Universities  

E-Print Network (OSTI)

West Virginia University 1 Oak Ridge Associated Universities Oak Ridge Associated Universities and a contractor for the U.S. Department of Energy (DOE) located in Oak Ridge, Tennessee. ORAU works with its, and research appointments; and to organize research alliances among its members. Through the Oak Ridge

Mohaghegh, Shahab

362

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY  

E-Print Network (OSTI)

1 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Simulation of supersonic combustion and Mathematics Division Oak Ridge National Laboratory Oak Ridge, Tennessee SIAM Conference on Computational of Advanced Scientific Computing Research; U.S. Department of Energy (DOE) and was performed at the Oak Ridge

Deiterding, Ralf

363

Description of Facilities and Resources Oak Ridge National Laboratory  

E-Print Network (OSTI)

1 Description of Facilities and Resources Oak Ridge National Laboratory and the UT-ORNL Joint Institute for Computational Sciences 1. Oak Ridge National Laboratory Computer Facilities. The Oak Ridge National Laboratory (ORNL) hosts three petascale computing facilities: the Oak Ridge Leadership Computing

364

Mechanisms for Partnering with Oak Ridge National Laboratory  

E-Print Network (OSTI)

#12;2 Mechanisms for Partnering with Oak Ridge National Laboratory Partnerships--It's our name, but it also represents our driving philosophy and commitment. Oak Ridge National Laboratory (ORNL) has. Partnerships Oak Ridge National Laboratory Bldg. 4500N, MS 6196 Oak Ridge, TN 37831-6196 Phone: 866

365

UT OAK RIDGE FACILITY To Y-12 National  

E-Print Network (OSTI)

5 UT ­ OAK RIDGE FACILITY To Y-12 National Security Complex To East Tennessee Technology Park (ETTP To Knoxville and McGhee Tyson Airport Via 162 / I-140 (Pellissippi Parkway) OAK RIDGE TURNPIKE 10 2 MILES 95 To Oak Ridge National Laboratory 9 3 2 4 1 9 7 6 8 TU LANE TU LANE NEWYORK UT OUTREACH CENTER UT-OAK

366

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY  

E-Print Network (OSTI)

1 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY AAAS Symposium CO2 Fertilization: Boon. Norby Environmental Sciences Division Oak Ridge National Laboratory #12;2 OAK RIDGE NATIONAL LABORATORY Amicus Journal Fall: 8 #12;3 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY CO2 fertilization

367

at Oak Ridge National Laboratory A Project of  

E-Print Network (OSTI)

Oak Ridge at Oak Ridge National Laboratory A Project of One of the Community Reuse Organization.241.2149 ORNL2010-G01039/aas Supporting the Technology Transfer Mission The Oak Ridge Science and Technology Building... ...Partnerships with Oak Ridge National Laboratory have Never Been Easier! The Design Phase I

Pennycook, Steve

368

OAK RIDGE ORNL/TM-2008/131 NATIONAL LABORATORY  

E-Print Network (OSTI)

OAK RIDGE ORNL/TM-2008/131 NATIONAL LABORATORY MANAGED BY UT-BATTELLE FOR THE DEPARTMENT OF ENERGY by R. W. Leggetta K. F. Eckermana R. A. Meckb a Oak Ridge National Laboratory Oak Ridge, Tennessee: Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831 Telephone: 865

Pennycook, Steve

369

History of the Laboratory Protection Division Oak Ridge National Laboratory  

E-Print Network (OSTI)

i i #12;#12;History of the Laboratory Protection Division Oak Ridge National Laboratory 1942, Emergency Preparedness Date Published: March 1992 Prepared by the Oak Ridge National Laboratory Oak Ridge stations should be tucked comfortably away in isolated places. As such, the Oak Ridge area seemed perfect

370

May 12, 2005 Christian Engelmann, Oak Ridge National Laboratory  

E-Print Network (OSTI)

May 12, 2005 Christian Engelmann, Oak Ridge National Laboratory High Availability for Ultra Christian Engelmann Network and Cluster Computing Group Computer Science and Mathematics Division Oak Ridge National Laboratory, Oak Ridge, USA #12;May 12, 2005 Christian Engelmann, Oak Ridge National Laboratory

Engelmann, Christian

371

September 26, 2005 Christian Engelmann, Oak Ridge National Laboratory  

E-Print Network (OSTI)

September 26, 2005 Christian Engelmann, Oak Ridge National Laboratory High Availability for Ultra Christian Engelmann Network and Cluster Computing Group Computer Science and Mathematics Division Oak Ridge National Laboratory, Oak Ridge, USA #12;September 26, 2005 Christian Engelmann, Oak Ridge National

Engelmann, Christian

372

RECENT CRYSTAL STRUCTURE DETERMINATIONS BY NEUTRON DIFFRACTION AT OAK RIDGE  

E-Print Network (OSTI)

469. RECENT CRYSTAL STRUCTURE DETERMINATIONS BY NEUTRON DIFFRACTION AT OAK RIDGE By GEORGE M. BROWN and HENRI A. LEVY, Chemistry Division Oak Ridge National Laboratory (1), Oak Ridge, Tennessee, U. S. A ont été relevées grace au diffractomètre à neutrons d'Oak Ridge position- nant automatiquement les

Paris-Sud XI, Université de

373

Independent Oversight Review, Oak Ridge National Laboratory- January 2013  

Energy.gov (U.S. Department of Energy (DOE))

Review of the Oak Ridge National Laboratory High Flux Isotope Reactor Implementation Verification Review Processes

374

California Valley Solar Ranch Biological Assessment  

Energy.gov (U.S. Department of Energy (DOE))

Biological Assessment for the California Valley Solar Ranch Project San Luis Obispo County, California

375

monument valley.cdr  

Office of Legacy Management (LM)

The The Monument Valley Processing Site is located on the Navajo Nation in northeastern Arizona, about 15 miles south of Mexican Hat, Utah. A uranium-ore processing mill operated at the site from 1955 to 1968 on property leased from the Navajo Nation. The mill closed in 1968, and control of the site reverted to the Navajo Nation. Most of the mill buildings were removed shortly thereafter. The milling process produced radioactive mill tailings, a predominantly sandy material. From 1955 until 1964, ore at the site was processed by mechanical milling using an upgrader, which crushed the ore and separated it by grain size. The finer-grained material, which was higher in uranium content, was shipped to other mills for chemical processing. Coarser-grained material was stored on site. These source materials and other site-related contamination were removed during surface remediation at the

376

Valley Forge Corporate Center  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

55 Jefferson Ave. 55 Jefferson Ave. Valley Forge Corporate Center Norristown, PA 19403-2497 Pauline Foley Assistant General Counsel 610.666.8248 | Fax - 610.666.8211 foleyp@pjm.com October 30, 2013 Via Electronic Mail: juliea.smith@hq.doe.gov Christopher.lawrence@hq.doe.gov Julie A. Smith Office of Electricity Delivery and Energy Reliability Mail Code: OE-20 U.S. Department of Energy 1000 Independence Avenue, SW Washington, D.C. 20585 Re: Department of Energy - Improving Performance of Federal Permitting and Review of Infrastructure Projects. Request for Information ("RFI") 78 Fed. Reg. 53436 (August 29, 2013) Dear Ms. Smith: Please accept the following comments submitted on behalf of PJM Interconnection, L.L.C. ("PJM") in response to the RFI issued in the above captioned matter. This letter responds

377

Environmental Assessment for U-233 Stabilization, and Building 3019 Complex Shutdown at the Oak Ridge National Laboratory Oak Ridge, Tennessee  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

74 74 Environmental Assessment for U-233 Stabilization, and Building 3019 Complex Shutdown at the Oak Ridge National Laboratory Oak Ridge, Tennessee U. S. Department of Energy Oak Ridge Office Oak Ridge, Tennessee March 2007 TABLE OF CONTENTS ACRONYMS ........................................................................................................................... vi 1. INTRODUCTION.....................................................................................................................1 1.1 PURPOSE AND NEED....................................................................................................1 1.2 BACKGROUND/OVERVIEW.........................................................................................1

378

The potential use of thiabendazole and propiconazole for oak wilt control in live oak  

E-Print Network (OSTI)

THE POTENTIAL USE OF THIABENDAZOLE AND PROPICONAZOLE FOR OAK WILT CONTROL IN LIVE OAK A Thesis by PAUL EDWIN ROBERTS Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER... OF SCIENCE May 1988 Major Subject: Plant Pathology THE POTENTIAL USE OF THIABENDAZOLE AND PROPICONAZOLE FOR OAK WILT CONTROL IN LIVE OAK A Thesis by PAUL EDWIN ROBERTS Approved as to style and content by: David N. Ap 1 (Chair of Committee) Charles M...

Roberts, Paul Edwin

2012-06-07T23:59:59.000Z

379

Transportation and Directions to Oak Ridge  

NLE Websites -- All DOE Office Websites (Extended Search)

Transportation and Directions to Oak Ridge Transportation and Directions to Oak Ridge Several major airlines have frequent daily flights to the nearby Knoxville McGee Tyson Airport (TYS). Travel from the airport to Oak Ridge takes about 30 minutes via rental car or taxi, available at the airport. ORNL has developed several maps of the area. Directions to the lab from various points of origin are below. Visitors will be issued temporary passes at the guard gate and will be directed to the visitor center. Instructions for "Entering ORNL" and a map to the visitor center may be helpful. Directions to the Oak Ridge National Laboratory From McGhee Tyson Airport (~25 mi.) Upon leaving the airport, follow the exit ramp as directed for "Knoxville". Merge onto US 129 North (Alcoa Highway). After aapproximately 3 mi. exit on

380

-p Oak Ricf~e Assokiatbd Unwersltles  

Office of Legacy Management (LM)

p Oak Ricf~e Assokiatbd p Oak Ricf~e Assokiatbd Unwersltles : ,k.*,., ;"~, :,: .; ,,: ;;:::A ~, ' ,, : : ~' ,Pie&red foitlie RADI' OLOGICAL SURVEY' ~ OF THE' BAKER AND WILLIAMS WAREHO,US' ES NEW YORK, KNEW YORK' ~ ,, .,,~ P. R. COlTEN, Environmental Survey and Site Assessment Program Energy/Environment Systems Division FINAL REPORT JUNE1990 ?- i i t * " i i, , F < I, ,., F 8 .& r . F, ; RADIOLOGICAL SURVEY OF THE BAKER AND WILLIAMS WAREHOUSES NEW YORK, NEW YORK Prepared by P. R. Cotten Environmental Survey & Site Assessment Program Energy/Environment Systems Division Oak Ridge Associated Universities Oak Ridge, TN 37831-0117 Project Staff J. D. Berger F. A. Payne S. F. Barnett J. L. Payne M. J. Laudernan A. Wall& E. A. Powell C. F. Weaver Prepared by

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Lion Television films at Oak Ridge  

NLE Websites -- All DOE Office Websites (Extended Search)

Lion Television films at Oak Ridge Several weeks ago an interesting e-mail came to me from ORNL's Public Relations office. The e-mail had a patent application drawing attached and...

382

Oak Ridge National Laboratory Environmental Management Portfolio...  

Office of Environmental Management (EM)

Technology Park Projects April 10, 2013 U.S. Department of Energy ETTP ORNL Y-12 City of Oak Ridge East Tennessee Technology Park (ETTP) is Transitioning to a Private Industrial...

383

AEC and Oak Ridge High School  

NLE Websites -- All DOE Office Websites (Extended Search)

Commission proudly published the following milestones in 1964 in the AEC Handbook on Oak Ridge Operations: 1. The gates were opened to the public in 1949 2. Land first leased...

384

Oak Ridge National Laboratory Environmental Management Portfolio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transuranic Waste Projects April 2013 U.S. Department of Energy ETTP ORNL Y-12 City of Oak Ridge Y-12 National Security Complex (Y-12) Execution Challenges Y-12 Cleanup...

385

Spring Valley | Open Energy Information  

Open Energy Info (EERE)

Valley Valley Jump to: navigation, search Name Spring Valley Facility Spring Valley Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Pattern Energy Developer Pattern Energy Energy Purchaser NV Energy Location Ely NV Coordinates 39.10555447°, -114.4940186° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.10555447,"lon":-114.4940186,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

386

Magic Valley | Open Energy Information  

Open Energy Info (EERE)

Valley Valley Jump to: navigation, search Name Magic Valley Facility Magic Valley Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner E.ON Climate & Renewables North America Developer E.ON Climate & Renewables North America Location Raymondville TX Coordinates 26.46534829°, -97.6725769° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.46534829,"lon":-97.6725769,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

387

Swauk Valley | Open Energy Information  

Open Energy Info (EERE)

Swauk Valley Swauk Valley Jump to: navigation, search Name Swauk Valley Facility Swauk Valley Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner McKinstry Developer McKinstry Location Ellensburg WA Coordinates 47.14163°, -120.754376° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.14163,"lon":-120.754376,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

388

South Valley Compliance Agreement Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

South Valley South Valley Agreement Name South Valley Superfund Site Interagency Agreement State New Mexico Agreement Type Compliance Agreement Legal Driver(s) CERCLA Scope Summary Interagency Agreement with the U.S. Air Force for payment of costs associated with the remediation of two operable units (the facility and San Jose 6) at the South Valley Superfund Site. Parties DOE; U.S. Air Force Date 9/26/1990 SCOPE * Set forth the actions required of the USAF and DOE to fulfill their respective responsibilities pursuant to the Settlement Agreement between DOE, USAF, and General Electric Company (8/29/1990). * Establish mechanism by which DOE will transfer, to a fund managed by the USAF, its share of the costs set forth in the Settlement Agreement. * Set forth each party's responsibilities and respective share of costs.

389

Retrofitting the Tennessee Valley Authority  

E-Print Network (OSTI)

As the flagship of the New Deal, the Tennessee Valley Authority (TVA) was a triumph of regional and environmental design that has since fallen on hard times. When writer James Agee toured the region in 1935, he described ...

Zeiber, Kristen (Kristen Ann)

2013-01-01T23:59:59.000Z

390

AMF Deployment, Ganges Valley, India  

NLE Websites -- All DOE Office Websites (Extended Search)

Valley region were shown to affect cloud formation and monsoon activity over the Indian Ocean. Growth in industries such as cement factories, steel mills, and the coal-fired...

391

Ecology of Owens Valley vole  

E-Print Network (OSTI)

Little current data exist concerning the status and ecology of Owens Valley vole (OVV; Microtus californicus vallicola), despite its California Department of Fish and Game listing as a Species of Special Concern. No formal studies have been...

Nelson, Fletcher Chris

2005-08-29T23:59:59.000Z

392

Valley Electric Association- Net Metering  

Energy.gov (U.S. Department of Energy (DOE))

The Board of Directors for Valley Electric Association (VEA) approved net metering in April 2008. The rules apply to systems up to 30 kW, though owners of larger systems may be able to negotiate...

393

Oak Ridge Reservation environmental report for 1989  

SciTech Connect

This two-volume report, the Oak Ridge Reservation Environmental Report for 1989, is the nineteenth in an annual series that began in 1971. It reports the results of a comprehensive, year-round program to monitor the impact of operations at the three major US Department of Energy (DOE) production and research installations in Oak Ridge on the immediate areas' and surrounding region's groundwater and surface waters, soil, air quality, vegetation and wildlife, and through these multiple and varied pathways, the resident human population. Information is presented for the environmental monitoring Quality Assurance (QA) Program, audits and reviews, waste management activities, land special environmental studies. Data are included for the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory (ORNL), and Oak Ridge Gaseous Diffusion Plant (ORGDP). Volume 1 presents narratives, summaries, and conclusions based on environmental monitoring at the three DOE installations and in the surrounding environs during calendar year (CY) 1989. Volume 1 is intended to be a stand-alone'' report about the Oak Ridge Reservation (ORR) for the reader who does not want an in-depth review of 1989 data. Volume 2 presents the detailed data from which these conclusions have been drawn and should be used in conjunction with Volume 1.

Jacobs, V.A.; Wilson, A.R. (eds.)

1990-10-01T23:59:59.000Z

394

Morphology and downslope sediment displacement in a deep-sea valley, the Valencia Valley (Northwestern Mediterranean)  

Science Journals Connector (OSTI)

The Valencia Valley is a Quaternary, 200 km long deep-sea valley in the Valencia Trough, Western Mediterranean Sea ... A swathmapping survey approximately mid-way along the valley length, where the floor has an a...

Suzanne O'Connell; Belen Alonso; Kim A. Kastens; Andrs Maldonado

1985-01-01T23:59:59.000Z

395

ADEC II Universal SCR Retrofit System for On-road and Off-road...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADEC II Universal SCR Retrofit System for On-road and Off-road Diesel Engines Richard Carlson Extengine Transport Systems, LLC Fullerton, California 2006 DEER Conference Poster...

396

Boulder Valley School District (Colorado) Power Purchase Agreement...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Boulder Valley School District (Colorado) Power Purchase Agreement Case Study Boulder Valley School District (Colorado) Power Purchase Agreement Case Study Boulder Valley School...

397

West Valley Demonstration Project Low-Level Waste Shipment |...  

Office of Environmental Management (EM)

West Valley Demonstration Project Low-Level Waste Shipment West Valley Demonstration Project Low-Level Waste Shipment West Valley Demonstration Project Low-Level Waste Shipment...

398

Radiological survey results at 4400 Piehl Road, Ottawa Lake, Michigan  

SciTech Connect

At the request of the US Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted a radiological survey at 4400 Piehl Road in Ottawa Lake, Michigan. The survey was performed in September, 1992. The purpose of the survey was to determine if materials containing uranium from work performed under government contract at the former Baker Brothers facility in Toledo, Ohio had been transported off-site to this neighboring area. The radiological survey included surface gamma scans indoors and outdoors, alpha and beta scans inside the house and attached garage, beta-gamma scans of the hard surfaces outside, and the collection of soil, water, and dust samples for radionuclide analyses. Results of the survey demonstrated that the majority of the measurements on the property were within DOE guidelines. However, the presence of isolated spots of uranium contamination were found in two areas where materials were allegedly transported to the property from the former Baker Brothers site. Uranium uptake by persons on the property by ingestion is fairly unlikely, but inhalation is a possibility. Based on these findings, it is recommended that the residential property at 4400 Piehl Road in Ottawa Lake, Michigan be considered for inclusion under FUSRAP.

Foley, R.D.; Johnson, C.A.

1993-04-01T23:59:59.000Z

399

Oak Ridge Office Oversight of the Fire Protection Program at the Oak Ridge Reservation, August 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Review of the Independent Review of the Oak Ridge Office Oversight of the Fire Protection Program at the Oak Ridge Reservation May 2011 August 2011 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose and Scope ............................................................................................................................... 1 2.0 Results ................................................................................................................................................... 1 3.0 Conclusions ........................................................................................................................................... 3

400

Treatment, storage, and disposal alternatives for the gunite and associated tanks at the Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

The gunite and associated tanks (GAAT) are inactive, liquid low-level waste tanks located in and around the North and South Tank Farms at Oak Ridge National Laboratory. These underground tanks are the subject of an ongoing treatability study that will determine the best remediation alternatives for the tanks. As part of the treatability study, an assessment of viable treatment, storage, and disposal (TSD) alternatives has been conducted. The report summarizes relevant waste characterization data and statistics obtained to date. The report describes screening and evaluation criteria for evaluating TSD options. Individual options that pass the screening criteria are described in some detail. Order-or-magnitude cost estimates are presented for each of the TSD system alternatives. All alternatives are compared to the baseline approach of pumping all of the GAAT sludge and supernate to the Melton Valley Storage Tank (MVST) facility for eventual TSD along with the existing MOST waste. Four TSD systems are identified as alternatives to the baseline approach. The baseline is the most expensive of the five identified alternatives. The least expensive alternative is in-situ grouting of all GAAT sludge followed by in-situ disposal. The other alternatives are: (1) ex-situ grouting with on-site storage and disposal at Nevada Test Site (NTS); (2) ex-situ grouting with on-site storage and disposal at NTS and the Waste Isolation Pilot Plant (WIPP); and (3) ex-situ vitrification with on-site storage and disposal at NTS and WIPP.

DePew, R.E.; Rickett, K. [Advanced Systems Technology, Inc., Oak Ridge, TN (United States); Redus, K.S. [MACTEC, Oak Ridge, TN (United States); DuMont, S.P. [Hazardous and Medical Waste Services, Inc. (United States); Lewis, B.E.; DePaoli, S.M.; Van Hoesen, S.D. Jr. [Oak Ridge National Lab., TN (United States)

1996-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Waste management plan for the remedial investigation/feasibility study of Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

This plan defines the criteria and methods to be used for managing waste generated during activities associated with Waste Area Grouping (WAG) 5 at Oak Ridge National Laboratory (ORNL). WAG 5 is located in Melton Valley, south of the main ORNL plant area. It contains 17 solid waste management units (SWMUs) to be evaluated during the remedial investigation. The SWMUs include three burial areas, two hydrofracture facilities, two settling ponds, eight tanks, and two low-level liquid waste leak sites. These locations are all considered to be within the WAG 5 area of contamination (AOC). The plan contains provisions for safely and effectively managing soils, rock cuttings, development and sampling water, decontamination fluids, and disposable personal protective equipment (PPE) consistent with the Environmental Protection Agency (EPA) guidance of May 1991 (EPA 1991). Consistent with EPA guidance, this plan is designed to protect the environment and the health and safety of workers and the public.

Not Available

1992-12-01T23:59:59.000Z

402

Waste management plan for the remedial investigation/feasibility study of Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoratin Program  

SciTech Connect

This plan defines the criteria and methods to be used for managing waste generated during activities associated with Waste Area Grouping (WAG) 5 at Oak Ridge National Laboratory (ORNL). WAG 5 is located in Melton Valley, south of the main ORNL plant area. It contains 17 solid waste management units (SWMUs) to be evaluated during the remedial investigation. The SWMUs include three burial areas, two hydrofracture facilities, two settling ponds, eight tanks, and two low-level liquid waste leak sites. These locations are all considered to be within the WAG 5 area of contamination (AOC). The plan contains provisions for safely and effectively managing soils, rock cuttings, development and sampling water, decontamination fluids, and disposable personal protective equipment (PPE) consistent with the Environmental Protection Agency (EPA) guidance of May 1991 (EPA 1991). Consistent with EPA guidance, this plan is designed to protect the environment and the health and safety of workers and the public.

Not Available

1992-12-01T23:59:59.000Z

403

U.S. Department of Energy, Oak Ridge Office and URS/CH2M Oak Ridge, LLC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy, Oak Ridge Office and URS/CH2M Oak Ridge, U.S. Department of Energy, Oak Ridge Office and URS/CH2M Oak Ridge, LLC (UCOR) East Tennessee Technology Park (ETTP) Contract Partnering Agreement U.S. Department of Energy, Oak Ridge Office and URS/CH2M Oak Ridge, LLC (UCOR) East Tennessee Technology Park (ETTP) Contract Partnering Agreement The Partnering Team will complete the cleanup, reindustrialize ETTP and continue Environmental Management (EM) activities currently ongoing at ORNL and Y-12. This work will be accomplished in a safe and quality manner with a goal of completion under budget and ahead of schedule. U.S. Department of Energy, Oak Ridge Office and URS/CH2M Oak Ridge, LLC (UCOR) East Tennessee Technology Park (ETTP) Contract Partnering Agreement More Documents & Publications Contractor Fee Payments - Oak Ridge Operations

404

Groundwater quality monitoring well installation for Waste Area Grouping at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect

This report documents the drilling and installation of 18 groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 11. WAG 11 (White Wing Scrap Yard) is located on the west end of East Fork Ridge between White Wing Road and the Oak Ridge Turnpike. The scrap yard is approximately 25 acres in size. The wells at WAG 11 were drilled and developed between January 1990 and October 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The wells at WAG 11 were drilled with auger or air rotary rigs. Depending on the hydrogeologic conditions present at each proposed well location, one of four basic installation methods was utilized. Detailed procedures for well construction were specified by the Engineering Division to ensure that the wells would provide water samples representative of the aquifer. To ensure conformance with the specifications, Energy Systems Construction Engineering and ERCE provided continuous oversight of field activities. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAG 11. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents.

Mortimore, J.A.; Lee, T.A.

1994-09-01T23:59:59.000Z

405

Mn/DOT County Road Safety Plans  

E-Print Network (OSTI)

Roads Program !! Minnesota Central Safety Funds !! Foster safety culture among county stakeholders 41 Mn/DOT County Road Safety Plans CTS Annual Research Conference April 27 & 28, 2010 Howard Preston & Objectives !! Project Overview !! Schedule, Participating Counties, Approach !! Safety Emphasis Areas

Minnesota, University of

406

Remedial investigation work plan for the Upper East Fork Poplar Creek characterization area, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

The Oak Ridge Y-12 Plant, located within the Oak Ridge Reservation (ORR), is owned by the US Department of Energy (DOE) and managed by Lockheed Martin Energy Systems, Inc. The entire ORR was placed on the National Priorities List (NPL) of CERCLA sites in November 1989. Following CERCLA guidelines, sites under investigation require a remedial investigation (RI) to define the nature and extent of contamination, evaluate the risks to public health and the environment, and determine the goals for a feasibility study (FS) of potential remedial actions. The need to complete RIs in a timely manner resulted in the establishment of the Upper East Fork Poplar Creek (UEFPC) Characterization Area (CA) and the Bear Creek CA. The CA approach considers the entire watershed and examines all appropriate media within it. The UEFPC CA, which includes the main Y-12 Plant area, is an operationally and hydrogeologically complex area that contains numerous contaminants and containment sources, as well as ongoing industrial and defense-related activities. The UEFPC CA also is the suspected point of origin for off-site groundwater and surface-water contamination. The UEFPC CA RI also will address a carbon-tetrachloride/chloroform-dominated groundwater plume that extends east of the DOE property line into Union Valley, which appears to be connected with springs in the valley. In addition, surface water in UEFPC to the Lower East Fork Poplar Creek CA boundary will be addressed. Through investigation of the entire watershed as one ``site,`` data gaps and contaminated areas will be identified and prioritized more efficiently than through separate investigations of many discrete units.

NONE

1995-09-01T23:59:59.000Z

407

Rosetta on the Road: an outreach project  

E-Print Network (OSTI)

on the Road · Uses the groundbreaking ESA Rosetta mission ­ comet rendezvous and landing ­ as a basis

408

Sally Johnson 123 Bakers Road  

E-Print Network (OSTI)

Sally Johnson 123 Bakers Road Nashville, TN 37212 Sally.Johnson@vanderbilt.edu May 2, 2011 Leslie qualifications, you may reach me at (615) 555-5555 or Sally.johnson@vanderbilt.edu at your earliest convenience) Sally Johnson Enclosure Address blocks are used when the document is printed or attached to an email

Bordenstein, Seth

409

Oak Ridge Construction Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONSTRUCT ON WORKERS CONSTRUCT ON WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT* December, 1997 Dr. Eula Bingharn, P.1. University of Cincinnati *Ts revised needs assessment reflects an a4fressçs comments from the NIOSH review of our original needs assessment, July, 1997. SURVEILLANCE OF FORMER CONSTRUCTION WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT* December, 1997 * * Dr. Eula Bingham, P.1. University of Cincinnati * * *Thjs rerised needs assessment reflects and addtesses comments from the NIOSH review of our original needs assessment, July, 1997! * SURVEILLANCE OF FORMER CONSTRUCTION WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT Principal Investigator Eula Bingham Introduction - Need for Establishing Medical Evaluation and Page Notification 1 a. Medical Surveillance

410

Wildlife -- Oak Ridge National Environmental Research Park  

NLE Websites -- All DOE Office Websites (Extended Search)

What's New What's New Wildlife Some of the links on this page lead to documents in Portable Document Format (PDF) and can only be viewed with Adobe Acrobat Reader. You can download a free copy from the Adobe site. WILDLIFE MANAGEMENT HUNTING ON THE OAK RIDGE RESERVATION OTHER WILDLIFE INFORMATION WILDLIFE MANAGEMENT Top of Page ORR Wildlife Management Update (Presentation - February 5, 2010) Goose Control. (Video - December 2009) Giffen, Neil R., James W. Evans, and Patricia D. Parr. 2007. Wildlife Management Plan for the Oak Ridge Reservation. ORNL/TM-2006/155. August. Giffen, Neil R. 2007. Nuisance Wildlife Education and Prevention Plan for the Oak Ridge National Laboratory ORNL/TM-2006/154. March. Wildlife Management Plan for the ORR (Presentation - November 2006) Wildlife Management Activities on the ORR (Presentation - September 2006)

411

REPORT OF SURVEY OF OAK RIDGE ISOTOPE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OAK RIDGE ISOTOPE OAK RIDGE ISOTOPE ENRICHMENT (CALUTRON) FACILITY BUILDING 9204-3 U.S. Department of Energy Office of Environmental Management & Office of Nuclear Energy Report of Survey of Oak Ridge Isotope Enrichment (Calutron) Facility Building 9204-3 FINAL May 8, 2000 Contents 1. Introduction 1.1 Purpose 1.2 Facility Description 1.3 Organization Representatives 1.4 Survey Participants 2. Summary, Conclusions & Recommendations 2.1 Transfer Considerations 2.2 Post-Transfer EM Path Forward & Management Risk 3. Survey Results 4. Stabilization and Other Actions Required for Transfer 5. Surveillance & Maintenance After Transfer 6. Other Transfer Details 7. Attachments and References Appendix A - Detailed Survey Notes

412

Oak Ridge National Laboratory (ORNL) Enforcement Letter  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31, 2002 31, 2002 Dr. William J. Madia [ ] Oak Ridge National Laboratory P.O. Box 2008 Oak Ridge, TN 37831-6255 Subject: Oak Ridge National Laboratory (ORNL) Enforcement Letter Dear Dr. Madia: The Office of Price-Anderson Enforcement (OE) has conducted a preliminary evaluation of the deficiencies described in Noncompliance Tracking System (NTS) report NTS- ORO--ORNL-X10PHYSICS-2002-0001. Our evaluation included review of the investigation report, associated corrective action plan, and discussion with site personnel. The subject NTS report described a series of deficiencies that resulted in several personnel being exposed to unanticipated radiation fields during the startup testing of an electron cyclotron resonance (ECR) source at the [facility]. The exposures occurred

413

Screening of contaminants in Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

Waste Area Grouping 2 (WAG 2) of the Oak Ridge National Laboratory (ORNL) is located in the White Oak Creek Watershed and is composed of White Oak Creek Embayment, White Oak Lake and associated floodplain, and portions of White Oak Creek (WOC) and Melton Branch downstream of ORNL facilities. Contaminants leaving other ORNL WAGs in the WOC watershed pass through WAG 2 before entering the Clinch River. Health and ecological risk screening analyses were conducted on contaminants in WAG 2 to determine which contaminants were of concern and would require immediate consideration for remedial action and which contaminants could be assigned a low priority or further study. For screening purposes, WAG 2 was divided into four geographic reaches: Reach 1, a portion of WOC; Reach 2, Melton Branch; Reach 3, White Oak Lake and the floodplain area to the weirs on WOC and Melton Branch; and Reach 4, the White Oak Creek Embayment, for which an independent screening analysis has been completed. Screening analyses were conducted using data bases compiled from existing data on carcinogenic and noncarcinogenic contaminants, which included organics, inorganics, and radionuclides. Contaminants for which at least one ample had a concentration above the level of detection were placed in a detectable contaminants data base. Those contaminants for which all samples were below the level of detection were placed in a nondetectable contaminants data base.

Blaylock, B.G.; Frank, M.L.; Hoffman, F.O.; Hook, L.A.; Suter, G.W.; Watts, J.A.

1992-07-01T23:59:59.000Z

414

Case Study - Sioux Valley Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sioux Valley Energy Sioux Valley Energy SVE's smart meters report consumption levels every 30 minutes, which enables SVE to bill customers for critical peak events that occur on particular days and during particular time periods. This detailed billing cannot be done with conventional meters. Critical Peak Pricing Lowers Peak Demands and Electric Bills in South Dakota and Minnesota Sioux Valley Energy (SVE) is an electric cooperative serving approximately 21,000 customers in seven counties in South Dakota and Minnesota. SVE's Smart Grid Investment Grant (SGIG) Advanced Metering Infrastructure Project is a customer-focused initiative to assist customers with better managing their electricity consumption and associated costs, and to help SVE realize operational efficiencies and

415

Moors Valley Play Trail Moors Valley Country Park is a very popular attraction  

E-Print Network (OSTI)

visitors to Moors Valley Country Park use the play trail. · Sport England's South West Regional PlanMoors Valley Play Trail objectives Moors Valley Country Park is a very popular attraction welcoming more than 750,000 visitors a year. Ranked in the top 20 national attractions Moors Valley is deemed

416

Preliminary engineering report waste area grouping 5, Old Hydrofracture Facility Tanks content removal project, Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

The Superfund Amendments and Reauthorization Act of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requires a Federal Facilities Agreement (FFA) for federal facilities placed on the National Priorities List. The Oak Ridge Reservation was placed on that list on December 21, 1989, and the agreement was signed in November 1991 by the U.S. Department of Energy (DOE) Oak Ridge Operations Office, the U.S. Environmental Protection Agency (EPA) Region IV, and the Tennessee Department of Environment and Conservation (TDEC). The effective date of the FFA is January 1, 1992. One objective of the FFA is to ensure that liquid low-level waste (LLLW) tanks that are removed from service are evaluated and remediated through the CERCLA process. Five inactive LLLW tanks, designated T-1, T-2, T-3, T-4, and T-9, located at the Old Hydrofracture (OHF) Facility in the Melton Valley area of Oak Ridge National Laboratory (ORNL) have been evaluated and are now entering the remediation phase. As a precursor to final remediation, this project will remove the current liquid and sludge contents of each of the five tanks (System Requirements Document, Appendix A). It was concluded in the Engineering Evaluation/Cost Analysis [EE/CA] for the Old Hydrofracture Facility Tanks (DOE 1996) that sluicing and pumping the contaminated liquid and sludge from the five OHF tanks was the preferred removal action. Evaluation indicated that this alternative meets the removal action objective and can be effective, implementable, and cost-effective. Sluicing and removing the tank contents was selected because this action uses (1) applicable experience, (2) the latest information about technologies and techniques for removing the wastes from the tanks, and (3) activities that are currently acceptable for storage of transuranic (TRU) mixed waste.

NONE

1996-06-01T23:59:59.000Z

417

Annual Planning Summaries: Oak Ridge Office (OR) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge Office (OR) Oak Ridge Office (OR) Annual Planning Summaries: Oak Ridge Office (OR) Document(s) Available For Download February 23, 2012 2012 Annual Planning Summary for Oak Ridge Office The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within the Oak Ridge Office. January 28, 2011 2011 Annual Planning Summary for Oak Ridge Operations Office (OR) The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Oak Ridge Operations Office (OR) (See Environmental Management and Science). February 1, 2010 2010 Annual Planning Summary for Oak Ridge (OR) Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12

418

Energy Secretary Steven Chu Visits Oak Ridge | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Visits Oak Ridge Visits Oak Ridge Energy Secretary Steven Chu Visits Oak Ridge March 23, 2010 - 12:00am Addthis OAK RIDGE, TN - At an event earlier this afternoon at Oak Ridge National Laboratory, U.S. Energy Secretary Steven Chu announced that DOE has issued a five-year extension to its current management and operating contractor, UT-Battelle, LLC, for the continued operation of the Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. While at Oak Ridge, Secretary Chu also met with staff from the laboratory and saw firsthand the progress that has been made possible as a result of the Recovery Act investments at the site. "ORNL's world-class facilities and scientific talent are vital to developing solutions to the Nation's many energy challenges," said

419

Recommendation 225: Recommendation on DOE Oak Ridge GIS Fact...  

Energy Savers (EERE)

Recommendation 225: Recommendation on DOE Oak Ridge GIS Fact Sheets Recommendation 225: Recommendation on DOE Oak Ridge GIS Fact Sheets Not all fact sheets that can be accessed on...

420

Dr. Xiang-Qiang Chu Oak Ridge National Laboratory  

E-Print Network (OSTI)

Colloquium Dr. Xiang-Qiang Chu Oak Ridge National Laboratory "Neutron Scattering for Biological at the world's largest neutron source SNS at Oak Ridge National Lab, quasi-elastic neutron scattering (QENS

Baskaran, Mark

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

DOE's Oak Ridge and Lawrence Berkeley National Labs Join with...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE's Oak Ridge and Lawrence Berkeley National Labs Join with Dow Chemical to Develop Next-Generation Cool Roofs DOE's Oak Ridge and Lawrence Berkeley National Labs Join with Dow...

422

ORIGINAL ARTICLE The paleolimnology of Haynes Lake, Oak Ridges Moraine,  

E-Print Network (OSTI)

ORIGINAL ARTICLE The paleolimnology of Haynes Lake, Oak Ridges Moraine, Ontario, Canada-Verlag 2012 Abstract Haynes Lake is a small kettle lake located on the Oak Ridges Moraine, and is within

Patterson, Timothy

423

Enforcement Letter, Oak Ridge National Laboratory LLC- May 13...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Letter, Oak Ridge National Laboratory LLC- May 13, 2009 Enforcement Letter, Oak Ridge National Laboratory LLC- May 13, 2009 May 13, 2009 Issued to UT-Battelle, LLC related to a...

424

P.O. Box 117, Oak Ridge, TN 37831  

NLE Websites -- All DOE Office Websites (Extended Search)

Box 117, Oak Ridge, TN 37831 g (865) 241-8893 g IVsurveys@orau.org On the Web: www.orau.orgenvironmental-assessments-health-physics Oak Ridge Associated Universities (ORAU) is a...

425

Enforcement Letter, Oak Ridge National Laboratory - May 31, 2002...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- May 31, 2002 Enforcement Letter, Oak Ridge National Laboratory - May 31, 2002 May 31, 2002 Issued to UT-Battelle, LLC related to Unplanned Radiation Exposures at Oak Ridge...

426

About Oak Ridge | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

About Oak Ridge 2012 Y-12 interns Oak Ridge is one of the most scientifically influential cities in the United States. With a rich history dating back to the 1940s, the Atomic City...

427

Mr. David Hemelright, Chair Oak Ridge Site Specific Advisory...  

Office of Environmental Management (EM)

David Hemelright, Chair Oak Ridge Site Specific Advisory Board P.O. Box 2001 , EM-91 Oak Ridge, Tennessee 37831 Dear Mr. Hemelright: SEP.. 2 0 2013 This is in response to your June...

428

Bill Wilcox ? The transformation and second birth of Oak Ridge...  

NLE Websites -- All DOE Office Websites (Extended Search)

3 As we continue to examine the transition of the city of Oak Ridge in the late 1950s toward incorporation, the speech Bill Wilcox, who was the Oak Ridge city historian until his...

429

Questions remain on funding for cleanup of Oak Ridge Reservation...  

Office of Environmental Management (EM)

Questions remain on funding for cleanup of Oak Ridge Reservation Questions remain on funding for cleanup of Oak Ridge Reservation March 18, 2013 - 12:00pm Addthis There is great...

430

Contractor Fee Payments - Oak Ridge Operations | Department of...  

Office of Environmental Management (EM)

Oak Ridge Operations Contractor Fee Payments - Oak Ridge Operations See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to...

431

CRAD, Safety Basis - Oak Ridge National Laboratory High Flux...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Safety Basis - Oak Ridge National Laboratory High Flux Isotope Reactor February 2007 A section of Appendix C to DOE G...

432

Oak Ridge National Laboratory Cleanup | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge National Laboratory Cleanup Oak Ridge National Laboratory Cleanup This fact sheet provides an update on all of the current cleanup projects at the site, and it also lists...

433

Bill Wilcox ? The transformation and second birth of Oak Ridge...  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Bill Wilcox, who was the Oak Ridge city historian, until his passing on September 2, 2013, gave a speech on June 4, 2010, entitled The Transformation and Second Birth of Oak...

434

First Oak Ridge Remote-Handled Transuranic Waste Shipment Arrives...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First Oak Ridge Remote-Handled Transuranic Waste Shipment Arrives Safely at WIPP First Oak Ridge Remote-Handled Transuranic Waste Shipment Arrives Safely at WIPP March 2, 2009 -...

435

Oak Ridge Operations Office of Environmental Management Overview  

Office of Environmental Management (EM)

Oak Ridge Environmental Management Program Moving to the Future by Cleaning up the Past Sue Cange Acting Manager May 16, 2012 Oak Ridge Cleanup Work is Urgent and Essential * Our...

436

CRAD, Training - Oak Ridge National Laboratory TRU ALPHA LLWT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training - Oak Ridge National Laboratory TRU ALPHA LLWT Project CRAD, Training - Oak Ridge National Laboratory TRU ALPHA LLWT Project November 2003 A section of Appendix C to DOE G...

437

Bill Wilcox ? The transformation and second birth of Oak Ridge...  

NLE Websites -- All DOE Office Websites (Extended Search)

4 As we continue to examine the transition of the city of Oak Ridge in the late 1950s toward incorporation, the speech Bill Wilcox, who was the Oak Ridge city historian, until his...

438

ORIGINAL ARTICLE The paleolimnology of Haynes Lake, Oak Ridges Moraine,  

E-Print Network (OSTI)

ORIGINAL ARTICLE The paleolimnology of Haynes Lake, Oak Ridges Moraine, Ontario, Canada is a small kettle lake located on the Oak Ridges Moraine, and is within the Greater metropolitan area

Patterson, Timothy

439

Oak Ridge Centers for Manufacturing Technology ? Insights from...  

NLE Websites -- All DOE Office Websites (Extended Search)

Jack Cook The long-term partner with Dave Beck from Y-12, as well as Co-Director of the Oak Ridge Centers for Manufacturing Technology (ORMCT), was Jack Cook of Oak Ridge...

440

Report of Survey of Oak Ridge Isotope Enrichment (Calutron) Facility...  

Office of Environmental Management (EM)

Report of Survey of Oak Ridge Isotope Enrichment (Calutron) Facility Building 9204-3 Report of Survey of Oak Ridge Isotope Enrichment (Calutron) Facility Building 9204-3 The...

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Mr. Steven Dixon, Chair Oak Ridge Site Specific Advisory Board  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steven Dixon, Chair Oak Ridge Site Specific Advisory Board P.O. BOX 2001, EM-91 Oak Ridge, Tennessee 3783 1 Dear Mr. Dixon: Thank you for your April 9,2009, letter with...

442

FTCP Site Specific Information - Oak Ridge Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Oak Ridge Office FTCP Agent Organization Name Phone E-Mail Oak Ridge Patrick Smith 865574-0960 smithpn@oro.doe.gov Annual Workforce Analysis and Staffing Plan Reports...

443

Stewardship on the Oak Ridge Reservation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Stewardship Stewardship on the on the Oak Ridge Reservation Oak Ridge Reservation * * End Use Working Group End Use Working Group formed in 1997 formed in 1997 - - a broad a broad based community based community constituency determined in constituency determined in its 1998 Final Report that its 1998 Final Report that some contamination would some contamination would remain in place at certain remain in place at certain locations with adequate locations with adequate groundwater protection and groundwater protection and long long - - term stewardship term stewardship ORSSAB Established in 1995 ORSSAB Established in 1995 The Stakeholder The Stakeholder ' ' s Report on Stewardship (1998) s Report on Stewardship (1998)

444

IMPERIAL VALLEY SAN DIEGO STATE UNIVERSITY  

E-Print Network (OSTI)

BULLETIN THE IMPERIAL VALLEY CAMPUS 2004-2005 SAN DIEGO STATE UNIVERSITY 720 HEBER AVENUE present the 2004-2005 Bulletin of the Imperial Valley Campus of San Diego State University. Its in the educational opportunities offered at the Imperial Valley Campus of San Diego State University and look forward

Gallo, Linda C.

445

IMPERIAL VALLEY SAN DIEGO STATE UNIVERSITY  

E-Print Network (OSTI)

BULLETIN THE IMPERIAL VALLEY CAMPUS 2006-2007 SAN DIEGO STATE UNIVERSITY 720 HEBER AVENUE pleasure that we present the 2006-2007 Bulletin of the Imperial Valley Campus of San Diego State University of Imperial Valley. During this time we have evolved from an institution created to grant elementary teaching

Gallo, Linda C.

446

IMPERIAL VALLEY SAN DIEGO STATE UNIVERSITY  

E-Print Network (OSTI)

BULLETIN THE IMPERIAL VALLEY CAMPUS 2005-2006 SAN DIEGO STATE UNIVERSITY 720 HEBER AVENUE pleasure that we present the 2005-2006 Bulletin of the Imperial Valley Campus of San Diego State University of Imperial Valley. During this time we have evolved from an institution created to grant elementary teach ing

Gallo, Linda C.

447

IMPERIAL VALLEY SAN DIEGO STATE UNIVERSITY  

E-Print Network (OSTI)

BULLETIN THE IMPERIAL VALLEY CAMPUS 2007-2008 SAN DIEGO STATE UNIVERSITY 720 HEBER AVENUE pleasure that we present the 2007-2008 Bulletin of the Imperial Valley Campus of San Diego State University of Imperial Valley. During this time we have evolved from an institution created to grant elementary teaching

Gallo, Linda C.

448

IMPERIAL VALLEY SAN DIEGO STATE UNIVERSITY  

E-Print Network (OSTI)

BULLETIN THE IMPERIAL VALLEY CAMPUS 2008-2009 SAN DIEGO STATE UNIVERSITY 720 HEBER AVENUE pleasure that we present the 2008-2009 Bulletin of the Imperial Valley Campus of San Diego State University of Imperial Valley. During this time we have evolved from an institution created to grant elementary teaching

Gallo, Linda C.

449

Imperial Valley Campus San Diego State University  

E-Print Network (OSTI)

2014--2015 IVC 2014--2015 Bulletin Imperial Valley Campus San Diego State University #12;BULLETIN THE IMPERIAL VALLEY CAMPUS 2014-2015 SAN DIEGO STATE UNIVERSITY 720 HEBER AVENUE CALEXICO, CALIFORNIA 92231 760 clarification. #12;2 SDSU Imperial Valley Campus Bulletin 2014-2015 Message from the Dean It is with great

Gallo, Linda C.

450

IMPERIAL VALLEY SAN DIEGO STATE UNIVERSITY  

E-Print Network (OSTI)

BULLETIN THE IMPERIAL VALLEY CAMPUS 2009-2010 SAN DIEGO STATE UNIVERSITY 720 HEBER AVENUE pleasure that we present the 2009-2010 Bulletin of the Imperial Valley Campus of San Diego State University of Imperial Valley. During this time we have evolved from an institution created to grant elementary teaching

Gallo, Linda C.

451

Award Recipient Poudre Valley Health System  

E-Print Network (OSTI)

2008 Award Recipient Poudre Valley Health System Poudre Valley Health System (PVHS) is a locally, oncology, and orthopedic care. Founded in 1925 as the Poudre Valley Hospital (PVH) in Fort Collins, Colo." · Afterfirstestablishingrelationshipswithphysicians,PVHS expanded its partner base to include entities such as home health agencies, a long-term care

Magee, Joseph W.

452

Owens Valley Radio ObsevatoryOwens Valley Radio Obsevatory David Woody  

E-Print Network (OSTI)

Owens Valley Radio ObsevatoryOwens Valley Radio Obsevatory David Woody Owens Valley Radio · [Need pictures of the telescopes] 1/24/2008 2Woody #12;The Owens ValleyThe Owens Valley 1/24/2008 3Woody in the future · 40 m ­ 1960s ­ 1-20 GHz ­ Long history single dish and VLBI · VLBA antenna, 25 m dia · Misc. ­ 5

Weinreb, Sander

453

Berry phase effects on electronic properties Materials Science and Technology Division, Oak Ridge National Laboratory, Oak Ridge,  

E-Print Network (OSTI)

Ridge National Laboratory, Oak Ridge, Tennessee 37831, USA Ming-Che Chang Department of PhysicsBerry phase effects on electronic properties Di Xiao Materials Science and Technology Division, Oak

Wu, Zhigang

454

1Oak Ridge National Laboratory Science & Technology Highlights  

E-Print Network (OSTI)

program manager, DOE EERE Solar Energy Technologies Program. #12;2 Science & Technology Highlights Oak1Oak Ridge National Laboratory Science & Technology Highlights Published by Oak Ridge National continued on p. 3 First Solar Summit a Success continued on p. 2 The DOE Building America Project

Pennycook, Steve

455

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY  

E-Print Network (OSTI)

1 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Voice of the Customer Assessment Results Lynn Aaron Summer Intern Small Business Programs Office August 9, 2006 #12;2 OAK RIDGE NATIONAL on feedback and suggestions for improvement were given Voice of the Customer #12;3 OAK RIDGE NATIONAL

456

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY  

E-Print Network (OSTI)

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Overhead Bare Conductor Testing at Oak transmission- technology testing facilities ... at DOE 's Oak Ridge National Laboratory.*" Test Line Ridge National Laboratory Contact Information D. Tom Rizy, (865) 574-5203 Voice, (865) 574-9338 Fax

457

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY  

E-Print Network (OSTI)

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY A Framework for Check-Pointed Fault-Tolerant Out-of-Core Linear Algebra Ed D'Azevedo (e6d@ornl.gov) Oak Ridge National Laboratory Piotr Luszczek (luszczek@cs.utk.edu) University of Tennessee #12;OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY

Luszczek, Piotr

458

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY  

E-Print Network (OSTI)

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY 1 Deciphering the Structure of Gaseous Detonations by Numerical Simulation Ralf Deiterding Computer Science and Mathematics Division Oak Ridge Research; U.S. Department of Energy (DOE) and was performed at the Oak Ridge National Laboratory, which

Deiterding, Ralf

459

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY  

E-Print Network (OSTI)

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Tilt Option Discussion Issues Van Graves Phone Conference Sept 22, 2004 #12;2 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY orientation (as discussed in K. McDonald's 9Sept paper) Hg Drainage #12;4 OAK RIDGE NATIONAL LABORATORY U. S

McDonald, Kirk

460

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY  

E-Print Network (OSTI)

1 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Efficient fluid-structure interaction simulation of plates subjected to shock loading under water and in air Ralf Deiterding Oak Ridge National Laboratory Int. Workshop on Fluid-Structure Interaction, Herrsching Sep 30, 2008 #12;2 OAK RIDGE NATIONAL

Deiterding, Ralf

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY  

E-Print Network (OSTI)

1 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Amroc - A Cartesian SAMR Framework for Compressible Gas Dynamics Ralf Deiterding Computer Science and Mathematics Division Oak Ridge National Laboratory Oak Ridge, Tennessee SIAM Conference on Computational Science and Engineering Costa Mesa

Deiterding, Ralf

462

Oak Ridge National Laboratory U.S. Department of Energy  

E-Print Network (OSTI)

Oak Ridge National Laboratory U.S. Department of Energy September 05 Invasive plant management on the Oak Ridge Reservation Contact: Harry Quarles, quarleshdiii@ornl.gov, 865-241-2412 Sponsor: Reservation with planting of native species; monitoring and maintenance as necessary Photo © R. K. McConathy #12;Oak Ridge

463

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY  

E-Print Network (OSTI)

1/17/2008 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Hydrologic variability-order forested stream on DOE's Oak Ridge National Environmental Research Park. · Rates of GPP and ER varied-1) 2004 2005 #12;1/17/2008 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Investigations

464

Oak Ridge National Laboratory U.S. Department of Energy  

E-Print Network (OSTI)

Oak Ridge National Laboratory U.S. Department of Energy September 05 Throughfall Displacement and biogeochemical cycling processes. #12;Oak Ridge National Laboratory U.S. Department of Energy September 05) manipulation of precipitation inputs to an upland oak forest has been conducted. This Throughfall Displacement

465

NUCLEAR SCIENCE AND TECHNOLOGY DIVISION OAK RIDGE NATIONAL LABORATORY  

E-Print Network (OSTI)

NUCLEAR SCIENCE AND TECHNOLOGY DIVISION OAK RIDGE NATIONAL LABORATORY U.S. DEPARTMENT OF ENERGY-27, 2004 CERN Geneva, Switzerland #12;NUCLEAR SCIENCE AND TECHNOLOGY DIVISION OAK RIDGE NATIONAL LABORATORY Experience Installing New Equipment · Conclusions #12;NUCLEAR SCIENCE AND TECHNOLOGY DIVISION OAK RIDGE

McDonald, Kirk

466

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY  

E-Print Network (OSTI)

1 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Tri Cities Town Hall Forum August 9, 2006 #12;2 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Doing Business with ORNL and R&D Services 15.3% 92.0% TOTAL DOLLARS TOTAL ACTIONS #12;3 OAK RIDGE NATIONAL LABORATORY U. S

467

DOE/ORO/2296 Oak Ridge Reservation Annual Site  

E-Print Network (OSTI)

#12;#12;DOE/ORO/2296 Oak Ridge Reservation Annual Site Environmental Report for 2008 on the World Project manager, DOE-ORO David Page September 2009 Prepared by Oak Ridge National Laboratory P.O. Box 2008, Oak Ridge, TN 37831-2008 Managed by UT-Battelle, LLC, for the Department of Energy under Contract No

Pennycook, Steve

468

NUCLEAR SCIENCE AND TECHNOLOGY DIVISION OAK RIDGE NATIONAL LABORATORY  

E-Print Network (OSTI)

NUCLEAR SCIENCE AND TECHNOLOGY DIVISION OAK RIDGE NATIONAL LABORATORY U.S. DEPARTMENT OF ENERGY Upton, NY #12;2 NUCLEAR SCIENCE AND TECHNOLOGY DIVISION OAK RIDGE NATIONAL LABORATORY U.S. DEPARTMENT;3 NUCLEAR SCIENCE AND TECHNOLOGY DIVISION OAK RIDGE NATIONAL LABORATORY U.S. DEPARTMENT OF ENERGY Properties

McDonald, Kirk

469

Oak Ridge National Laboratory U.S. Department of Energy  

E-Print Network (OSTI)

Oak Ridge National Laboratory U.S. Department of Energy October 06 Sequencing the Populus Genome mechanistic ecosystem responses to global climate change. #12;Oak Ridge National Laboratory U.S. Department:1596-1603. #12;Oak Ridge National Laboratory U.S. Department of Energy October 06 #12;

470

Department of Energy (DOE) Oak Ridge Office (ORO) Project Life  

E-Print Network (OSTI)

Department of Energy (DOE) Oak Ridge Office (ORO) Project Life Cycle Reimbursable Funding://www.ornl.gov/wfo/exthome.htm September 27, 2007 #12;2 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Briefing Outline · Summary #12;3 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Secretary of Energy Legal Authority

471

SNS Experimental Facilities Oak Ridge1 SNS Project Overview  

E-Print Network (OSTI)

SNS Experimental Facilities Oak Ridge1 SNS Project Overview Development of High Powered Target. Riemer, P. Spampinato N. Mokhov, T. McManamy April 2002 #12;SNS Experimental Facilities Oak Ridge2 Facilities Oak Ridge3 SNS Basic Parameters List · Beam power >1 mW · Beam energy ~1 GeV · Pulse rate 60 hertz

McDonald, Kirk

472

Oak Ridge National Laboratory's Values in the Conduct of  

E-Print Network (OSTI)

#12;Oak Ridge National Laboratory's Values in the Conduct of Research and Development Prepared RIDGE NATIONAL LABORATORY Oak Ridge, Tennessee 37831-6285 operated by LOCKHEED MARTIN ENERGY RESEARCH in the Conduct of Research and Development Introduction No quality of the Oak Ridge National Laboratory (ORNL

473

Oak Ridge National Laboratory U.S. Department of Energy  

E-Print Network (OSTI)

Oak Ridge National Laboratory U.S. Department of Energy September 05 Enriched Background Isotope, BER (KP 12 02 02 0) EBIS takes advantage of a low-level1999 14C-release to the Oak Ridge Reservation agency and institution cooperation #12;Oak Ridge National Laboratory U.S. Department of Energy September

474

Department of Energy (DOE) Oak Ridge Office (ORO) Project Life  

E-Print Network (OSTI)

Department of Energy (DOE) Oak Ridge Office (ORO) Project Life Cycle Reimbursable Funding: http://www.ornl.gov/wfo/exthome.htm October 11, 2010 #12;OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT Project Closeout Process Summary #12;OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY 3 Secretary

475

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY  

E-Print Network (OSTI)

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY 1 Improving the parallel scaling Division Oak Ridge National Laboratory SIAM Conference on Parallel Data Processing Seattle, February 24, 2010 #12;OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY 2 In Collaboration with Sean Mauch

Deiterding, Ralf

476

SNS Experimental Facilities Oak Ridge SNS Mercury Target Issues and  

E-Print Network (OSTI)

SNS Experimental Facilities Oak Ridge SNS Mercury Target Issues and Development Program J. R. Haines October 30, 2000 #12;SNS Experimental Facilities Oak Ridge2 Outline · SNS Target Requirements;SNS Experimental Facilities Oak Ridge3 Mercury Target Requirements · 2 MW average proton beam power

McDonald, Kirk

477

Experimental Facilities Division Oak Ridge Nov. 13-15, 2002  

E-Print Network (OSTI)

Experimental Facilities Division Oak Ridge Nov. 13-15, 2002 PITTING ISSUE/TARGET DECISION John;Experimental Facilities Division Oak Ridge2 Nov. 13-15, 2002 SNS-XFD Doug Abernathy Michael Agamalian Ian The Pit Crew #12;Experimental Facilities Division Oak Ridge3 Nov. 13-15, 2002 Criteria and Deadlines

McDonald, Kirk

478

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY  

E-Print Network (OSTI)

1 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Upcoming Opportunities and Doing 9, 2006 #12;2 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY We Apply Our Strengths,912,343.44 - Total Small Business $215,111,951.98 OAK RIDGE NATIONAL LABORATORY The Business Side of Science #12

479

DOE/ORO/2261 Oak Ridge Reservation Annual Site  

E-Print Network (OSTI)

#12;#12;DOE/ORO/2261 Oak Ridge Reservation Annual Site Environmental Report for 2007 on the World, Jane Parrott Project manager, DOE-ORO David Page September 2008 Prepared by Oak Ridge National Laboratory P.O. Box 2008, Oak Ridge, TN 37831-2008 Managed by UT-Battelle, LLC, for the Department of Energy

Pennycook, Steve

480

Tanzania Roads Evaluation - Baseline | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Tanzania Roads Evaluation - Baseline Tanzania Roads Evaluation - Baseline Agriculture Community Menu DATA APPS EVENTS DEVELOPER STATISTICS COLLABORATE ABOUT Agriculture You are here Data.gov » Communities » Agriculture » Data Tanzania Roads Evaluation - Baseline Dataset Summary Description Baseline survey for impact evaluation of MCC's roads improvement investments in Tanzania. The evaluation will examine the project's household- and community-level effects on local standards of living along the roads. For the evaluation of major roads on the mainland, Economic Development Initiatives conducted a survey of 3,000 households in 200 communities in 2009. For the Pemba rural roads evaluation, Economic Development Initiatives conducted a survey on 570 households in the treatment group and 630 households in the comparison group.

Note: This page contains sample records for the topic "valley road oak" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

EA-1117: Management of Spent Nuclear Fuel on the Oak Ridge Reservation, Oak Ridge, Tennessee  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of the proposal for the management of spent nuclear fuel on the U.S. Department of Energy's Oak Ridge Reservation to implement the preferred alternative...

482

Valley County Secondary Data Analysis  

E-Print Network (OSTI)

Infarction prevalence (Heart Attack) 5.5% 4.1% 6.0% All Sites Cancer 472.3 455.5 543.2 1 Community Montana1,2 Nation2 1. Heart Disease 2. Cancer 3. Diabetes 1. Cancer 2. Heart Disease 3.CLRD* 1. Heart Disease 2. Cancer 3. CLRD* #12; Valley County Secondary Data Analysis July 23, 2012 2

Maxwell, Bruce D.

483

Santa Clara Valley Transportation Authority  

Energy.gov (U.S. Department of Energy (DOE))

Santa Clara Valley Transportation Authority (VTA) is based in San Jose, California, and provides service in and around Santa Clara county. VTA provides bus and light rail service in Santa Clara County, as well as congestion mitigation, highway improvement projects, and countywide transportation planning. VTA's 423 buses serve an annual ridership of more than 39 million and cover approximately 326 square miles.

484

Oak Ridge Manufacturing Demonstration Facility (MDF)  

Office of Energy Efficiency and Renewable Energy (EERE)

The Manufacturing Demonstration Facility (MDF) is a collaborative manufacturing community that shares a common RD&D infrastructure. This shared infrastructure provides affordable access to advanced physical and virtual tools for rapidly demonstrating new manufacturing technologies and optimizing critical processes. Oak Ridge National Laboratory is home to AMO's MDF focused on Additive Manufacturing and Low-cost Carbon Fiber.

485

Verdigris Valley Electric Cooperative - Residential Energy Efficiency  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Verdigris Valley Electric Cooperative - Residential Energy Verdigris Valley Electric Cooperative - Residential Energy Efficiency Rebate Program Verdigris Valley Electric Cooperative - Residential Energy Efficiency Rebate Program < Back Eligibility Residential Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Heat Pumps Appliances & Electronics Water Heating Program Info State Oklahoma Program Type Utility Rebate Program Rebate Amount Room Air Conditioner: $50 Electric Water Heaters: $50 - $199 Geothermal Heat Pumps (new): $300/ton Geothermal Heat Pumps (replacement): $150/ton Air-source/Dual Fuel Heat Pumps: $150/ton Provider Verdigris Valley Electric Cooperative Verdigris Valley Electric Cooperative (VVEC) offers rebates for residential customers who purchase energy efficient home equipment. Rebates are

486

Independent Oversight Review, West Valley Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Review, West Valley Demonstration Project Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 September 2000 Transportation Emergency Management Review of the West Valley Demonstration Project (WVDP) and National Transportation Program (NTP)/Transportation Compliance Evaluation/Assistance Program (TCEAP) The U.S. Department of Energy (DOE) Office of Emergency Management Oversight, within the Secretary of Energy's Office of Independent Oversight and Performance Assurance, conducted a transportation emergency management review of the West Valley Demonstration Project (WVDP) and National Transportation Program (NTP)/Transportation Compliance Evaluation/Assistance Program (TCEAP) in September 2000.

487

Independent Oversight Review, Oak Ridge Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Review, Oak Ridge Office of Environmental Independent Oversight Review, Oak Ridge Office of Environmental Management - February 2012 Independent Oversight Review, Oak Ridge Office of Environmental Management - February 2012 February 2012 Review of the Implementation Verification Review Processes at the Oak Ridge Office of Environmental Management for Building 3019 This report documents the independent review of implementation verification review (IVR) processes at the Oak Ridge Office of Environmental Management (ORO-EM) conducted by the Office of Enforcement and Oversight (Independent Oversight) within the Office of Health, Safety and Security (HSS). The review involved evaluation of established IVR processes and implementation of the newly revised documented safety analysis (DSA) and technical safety

488

Propagation of a Rapid Growing Semi-Evergreen Hybrid Oak.  

E-Print Network (OSTI)

combinations were also secured, from a smaller number of grafts, between hybrid scions and seedlings of the F2 (live X overcup), live oak (Fig. 4), and white oak (Q. alba). Only a small per- centage of the grafts on Chinese and water oaks grew, and none... cent of the grafts made on the F2 (live X overcup) seedlings grew (Fig. 5). Grafts on white oak (Q. alba) were not as successful as the few made in 1940. Poor results were again obtained with grafts on Chinese and water oaks. M BULLETIN NO. 612...

Flory, Walter S. (Walter Samuel); Brison, Fred R. (Fred Robert)

1942-01-01T23:59:59.000Z

489

A study of shin oak (Quercus havardi) poisoning in cattle  

E-Print Network (OSTI)

to 1$ days. Fach guinea oip was fed 20 grams of oak daily, and was fed rabbit nuggets free choice, Feeding Fresh Blossoms, Buds, and heaves of Shin Oak ?o Rabbits Sixty four rabbits were fed fresh shin oak from 5 ?, o 20 days. These rabbits readily...' mothers be'. ttp I'ed risk devt loses sl pns of i linens?but t bey los . weigh i. This also was orobably dtte decrease in mi'k yield by their mothers. Feeding Shin Oak i;o Guinea Pips Table ~tj Five of the seven guinea oigs die t afler being f d oak...

Dollahite, James Walton

2012-06-07T23:59:59.000Z

490

ITP Industrial Distributed Energy: Assessment of Large Combined...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary Report: Assessment of Large Combined Heat and Power Market ORNL Subcontract 4000021456 Task 2 Submitted to: Oak Ridge National Laboratory P.O. Box 2008 1 Bethel Valley Road...

491

Oak Ridge EM Program Collaborates with Regulators on Groundwater Strategy |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Collaborates with Regulators on Groundwater Collaborates with Regulators on Groundwater Strategy Oak Ridge EM Program Collaborates with Regulators on Groundwater Strategy June 26, 2013 - 12:00pm Addthis EM uses data collected at monitoring wells to determine groundwater migration patterns and potential risks. EM uses data collected at monitoring wells to determine groundwater migration patterns and potential risks. OAK RIDGE, Tenn. - The Oak Ridge EM program has joined state and federal regulators in a series of workshops to address contaminated groundwater on the Oak Ridge Reservation. The U.S. Environmental Protection Agency and Tennessee Department of Environment and Conservation are working with Oak Ridge's EM program and other organizations interested in the site's environmental cleanup and quality. Those entities include URS | CH2M Oak Ridge, Oak Ridge's prime

492

EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract July 12, 2012 - 12:00pm Addthis DOE and UCOR employees held an event today celebrating the recent contract reconciliation. DOE and UCOR employees held an event today celebrating the recent contract reconciliation. OAK RIDGE, Tenn. - At a ceremony today, Oak Ridge's Environmental Management (EM) program and its prime contractor, URS | CH2M Oak Ridge, LLC (UCOR) celebrated the completion of the site's reconciled cleanup contract. The newly aligned contract accurately specifies the projects and activities that the site's cleanup contractor will perform. "The speedy completion of this process is a testament to DOE and UCOR contract teams and managers," said Sue Cange, acting manager of the Oak

493

OAK RIDGE CERCLA DISPOSAL FACILITY ACHIEVES SAFETY MILESTONE | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OAK RIDGE CERCLA DISPOSAL FACILITY ACHIEVES SAFETY MILESTONE OAK RIDGE CERCLA DISPOSAL FACILITY ACHIEVES SAFETY MILESTONE OAK RIDGE CERCLA DISPOSAL FACILITY ACHIEVES SAFETY MILESTONE December 1, 2010 - 12:00pm Addthis OAK RIDGE CERCLA DISPOSAL FACILITY ACHIEVES SAFETY MILESTONE Oak Ridge, TN - The Environmental Management Waste Management Facility (EMWMF) provides the onsite disposal capability for the majority of cleanup-generated wastes on the Oak Ridge Reservation. EMWMF has continued a long-standing pattern of safe, complaint operations with 3,000 days without a lost workday case since operations commenced on May 28, 2002. The EMWMF has placed 1.5 million tons of waste and fill in the facility. The EMWMF receives waste from many Oak Ridge cleanup projects, including American Recovery and Reinvestment Act-funded projects, multiple

494

Oak Ridge EM Program Collaborates with Regulators on Groundwater Strategy |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge EM Program Collaborates with Regulators on Groundwater Oak Ridge EM Program Collaborates with Regulators on Groundwater Strategy Oak Ridge EM Program Collaborates with Regulators on Groundwater Strategy June 26, 2013 - 12:00pm Addthis EM uses data collected at monitoring wells to determine groundwater migration patterns and potential risks. EM uses data collected at monitoring wells to determine groundwater migration patterns and potential risks. OAK RIDGE, Tenn. - The Oak Ridge EM program has joined state and federal regulators in a series of workshops to address contaminated groundwater on the Oak Ridge Reservation. The U.S. Environmental Protection Agency and Tennessee Department of Environment and Conservation are working with Oak Ridge's EM program and other organizations interested in the site's environmental cleanup and

495

Enforcement Documents - Oak Ridge National Laboratory | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge National Laboratory Oak Ridge National Laboratory Enforcement Documents - Oak Ridge National Laboratory January 20, 2010 Enforcement Letter, Isoteck Systems, LLC - January 20, 2010 Enforcement Letter issued to Isotek Systems, LLC related to Quality Assurance Issues associated with the U233 Material Downblending and Disposition Project at Oak Ridge National Laboratory February 13, 2009 Enforcement Letter, Oak Ridge National Laboratory LLC- May 13, 2009 Enforcement Letter issued to UT-Battelle, LLC related to a Radioactive Material Release at the Holifield Radioactive Ion Beam Facility at Oak Ridge National Laboratory December 16, 2005 Preliminary Notice of Violation, UT-Battelle, LLC - EA-2005-06 Preliminary Notice of Violation issued to UT-Battelle, LLC, related to Facility Hazard Categorization and Safety Basis Compliance Issues at Oak

496

IMPROVED WELL PLUGGING EQUIPMENT AND WASTE MANGEMENT TECHNIQUES EXCEED ALARA GOALS AT THE OAK RIDGE NATIONAL LABORATORY  

SciTech Connect

In 2000, Bechtel Jacobs Company LLC (BJC) contracted Tetra Tech NUS, Inc. (TtNUS) and their sub-contractor, Texas World Operations, Inc. (TWO), to plug and abandon (P&A) 111 wells located in the Melton Valley area of Oak Ridge National Laboratory (ORNL). One hundred and seven of those wells were used to monitor fluid movement and subsurface containment of the low level radioactive liquid waste/grout slurry that was injected into the Pumpkin Valley Shale Formation, underlying ORNL. Four wells were used as hydrofracture injection wells to emplace the waste in the shale formation. Although the practice of hydrofracturing was and is considered by many to pose no threat to human health or the environment, the practice was halted in 1982 after the Federal Underground Injection Control regulations were enacted by United States Environmental Protection Agency (USEPA) making it necessary to properly close the wells. The work is being performed for the United States Department of Energy Oak Ridge Operations (DOE ORO). The project team is using the philosophy of minimum waste generation and the principles of ALARA (As Low As Reasonably Achievable) as key project goals to minimize personnel and equipment exposure, waste generation, and project costs. Achievement of these goals was demonstrated by the introduction of several new pieces of custom designed well plugging and abandonment equipment that were tested and used effectively during field operations. Highlights of the work performed and the equipment used are presented.

Whiteside, R.; Pawlowicz, R.; Whitehead, L.; Arnseth, R.

2002-02-25T23:59:59.000Z

497

Microsoft Word - CX-SwanValley-Goshen_GraniteCreekBoxCulvert_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SUBJECT: Environmental Clearance Memorandum Joe Johnson Natural Resource Specialist - TFBV-Kalispell Proposed Action: Replace existing bridge with a concrete box culvert at Granite Creek along Bonneville Power Administration's (BPA) Swan Valley-Goshen 161-kV transmission line. Budget Information: Work Order # 189268-01 PP&A Project No.: PP&A 2047 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities for structures, rights-of-way, and infrastructures, (such as roads), that are required to maintain infrastructures in a condition suitable for a facility to be used for its designated purpose. Location: The proposed project is located on Granite Creek along BPA's Swan Valley-Goshen

498

Microsoft Word - CX-RockyReach-MapleValley_Bridge_FY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR-4 KEPR-4 SUBJECT: Environmental Clearance Memorandum Richard Ross Project Manager - TELF-TPP-3 Proposed Action: Rocky Reach-Maple Valley #1 Temporary Bridge Installation (116/4-117/1) PP&A Project No.: 2203 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance. Location: The project area is confined to the existing access road located to the south of the right-of-way corridor of Bonneville Power Administration's (BPA) Rocky Reach-Maple Valley 345-kV transmission line between miles 116-117. The proposed project, located in King County, Washington, is within BPA's Covington District. Proposed by: BPA Description of the Proposed Action: BPA is proposing to construct a temporary bridge over

499

Hydrologic data summary for the White Oak Watershed at Oak Ridge National Laboratory, Oak Ridge, Tennessee, October 1990--December 1991  

SciTech Connect

This report summarizes for the 15-month period of October 1990-- December 1991 the available dynamic hydrologic data collected, primarily on the White Oak Creek (WOC) watershed, along with information collected on the surface flow systems that affect the quality or quantity of surface water. The collection of hydrologic data is one component of numerous, ongoing Oak Ridge National Laboratory (ORNL) environmental studies and monitoring programs and is intended to: (1) characterize the quantity and quality of water in the flow systems; (2) assist with the planning and assessment of remedial action activities; and, (3) provide long-term availability of data and quality assurance. Characterization of the hydrology of the WOC watershed is critical for understanding the processes that drive contaminant transport in the watershed. Identification of spatial and temporal trends in hydrologic parameters and mechanisms that affect the movement of contaminants supports the development of interim corrective measures and remedial restoration alternatives. In addition, hydrologic monitoring supports long-term assessment of the effectiveness of remedial actions in limiting the transport of contaminants across Waste Area Grouping (WAG) boundaries and ultimately to the off-site environment. For these reasons, it is of paramount importance to the Environmental Restoration Program (ERP) to collect and report hydrologic data activities that contribute to the Site Investigations component of the ERP. (White Oak Creek is also referred to as ``Whiteoak`` Creek).

Borders, D.M.; Gregory, S.M.; Clapp, R.B.; Frederick, B.J.; Watts, J.A.

1992-06-01T23:59:59.000Z

500

Hydrologic data summary for the White Oak Watershed at Oak Ridge National Laboratory, Oak Ridge, Tennessee, October 1990--December 1991  

SciTech Connect

This report summarizes for the 15-month period of October 1990-- December 1991 the available dynamic hydrologic data collected, primarily on the White Oak Creek (WOC) watershed, along with information collected on the surface flow systems that affect the quality or quantity of surface water. The collection of hydrologic data is one component of numerous, ongoing Oak Ridge National Laboratory (ORNL) environmental studies and monitoring programs and is intended to: (1) characterize the quantity and quality of water in the flow systems; (2) assist with the planning and assessment of remedial action activities; and, (3) provide long-term availability of data and quality assurance. Characterization of the hydrology of the WOC watershed is critical for understanding the processes that drive contaminant transport in the watershed. Identification of spatial and temporal trends in hydrologic parameters and mechanisms that affect the movement of contaminants supports the development of interim corrective measures and remedial restoration alternatives. In addition, hydrologic monitoring supports long-term assessment of the effectiveness of remedial actions in limiting the transport of contaminants across Waste Area Grouping (WAG) boundaries and ultimately to the off-site environment. For these reasons, it is of paramount importance to the Environmental Restoration Program (ERP) to collect and report hydrologic data activities that contribute to the Site Investigations component of the ERP. (White Oak Creek is also referred to as Whiteoak'' Creek).

Borders, D.M.; Gregory, S.M.; Clapp, R.B.; Frederick, B.J.; Watts, J.A.

1992-06-01T23:59:59.000Z