National Library of Energy BETA

Sample records for validate respondent control

  1. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    SciTech Connect (OSTI)

    Wipke, K.; Spirk, S.; Kurtz, J.; Ramsden, T.

    2010-09-01

    Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through September 2010.

  2. Demonstrating and Validating a Next Generation Model-Based Controller...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a Next Generation Model-Based Controller for Fuel Efficient, Low Emissions Diesel Engines Demonstrating and Validating a Next Generation Model-Based Controller for Fuel...

  3. V-139: Cisco Network Admission Control Input Validation Flaw...

    Broader source: Energy.gov (indexed) [DOE]

    PROBLEM: Cisco Network Admission Control Input Validation Flaw Lets Remote Users Inject SQL Commands PLATFORM: Cisco NAC Manager versions prior to 4.8.3.1 and 4.9.2 ABSTRACT: A...

  4. CHANCE: comprehensive software for quality control and validation of ChIP-seq data

    E-Print Network [OSTI]

    Diaz, Aaron; Nellore, Abhinav; Song, Jun S

    2012-01-01

    comprehensive software for quality control and validation ofcomprehensive software for quality control and validation ofOther software visualizes the distribution of quality scores

  5. Adaptive Cruise Control: Experimental Validation of Advanced Controllers on Scale-Model Cars

    E-Print Network [OSTI]

    Ames, Aaron

    Adaptive Cruise Control: Experimental Validation of Advanced Controllers on Scale-Model Cars Aakar of correctness. In particular, safety constraints--maintaining a valid following distance from a lead car objectives in an optimal fashion. This methodology is demonstrated on scale-model cars, for which the CBF

  6. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    SciTech Connect (OSTI)

    Stottler, Gary

    2012-02-08

    General Motors, LLC and energy partner Shell Hydrogen, LLC, deployed a system of hydrogen fuel cell electric vehicles integrated with a hydrogen fueling station infrastructure to operate under real world conditions as part of the U.S. Department of Energy's Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project. This technical report documents the performance and describes the learnings from progressive generations of vehicle fuel cell system technology and multiple approaches to hydrogen generation and delivery for vehicle fueling.

  7. Data Management Plan for The Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    Broader source: Energy.gov [DOE]

    The Data Management Plan describes how DOE will handle data submitted by recipients as deliverables under the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project.

  8. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Pre-Solicitation Meeting: Questions and Answers

    Broader source: Energy.gov [DOE]

    Questions and answers from the pre-solicitation meeting for the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project held March 19, 2003, in Southfield, Michigan.

  9. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Pre-Solicitation Meeting: Supporting Information

    Office of Energy Efficiency and Renewable Energy (EERE)

    Supporting information and objectives for the pre-solicitation meeting for the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project held March 19, 2003 in Southfield, Michigan.

  10. Validation of model based active control of combustion instability

    SciTech Connect (OSTI)

    Fleifil, M.; Ghoneim, Z.; Ghoniem, A.F.

    1998-07-01

    The demand for efficient, company and clean combustion systems have spurred research into the fundamental mechanisms governing their performance and means of interactively changing their performance characteristics. Thermoacoustic instability which is frequently observed in combustion systems with high power density, when burning close to the lean flammability limit, or using exhaust gas recirculation to meet more stringent emissions regulations, etc. Its occurrence and/or means to mitigate them passively lead to performance degradation such as reduced combustion efficiency, high local heat transfer rates, increase in the mixture equivalence ratio or system failure due to structural damage. This paper reports on their study of the origin of thermoacoustic instability, its dependence on system parameters and the means of actively controlling it. The authors have developed an analytical model of thermoacoustic instability in premixed combustors. The model combines a heat release dynamics model constructed using the kinematics of a premixed flame stabilized behind a perforated plate with the linearized conservation equations governing the system acoustics. This formulation allows model based controller design. In order to test the performance of the analytical model, a numerical solution of the partial differential equations governing the system has been carried out using the principle of harmonic separation and focusing on the dominant unstable mode. This leads to a system of ODEs governing the thermofluid variables. Analytical predictions of the frequency and growth ate of the unstable mode are shown to be in good agreement with the numerical simulations as well s with those obtained using experimental identification techniques when applied to a laboratory combustor. The authors use these results to confirm the validity of the assumptions used in formulating the analytical model. A controller based on the minimization of a cost function using the LQR technique has been designed using the analytical model and implemented on a bench top laboratory combustor. The authors show that the controller is capable of suppressing the pressure oscillations in the combustor with a settling time much shorter than what had been attained before and without exciting secondary peaks.

  11. Validating

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking WithTelecentric viewingValidating extended MHD models for fusion

  12. Validation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking WithTelecentric viewingValidating extended MHD

  13. Experiential Lighting Development and Validation of Perception-based Lighting Controls

    E-Print Network [OSTI]

    Experiential Lighting Development and Validation of Perception-based Lighting Controls BY MATTHEW Lighting Development and Validation of Perception-based Lighting Controls by Matthew Aldrich Submitted Lighting, and its emergence as a digital and networked medium, represents an ideal platform for conducting

  14. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Fall 2009; Composite Data Products, Final Version September 11, 2009

    SciTech Connect (OSTI)

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

    2009-09-01

    Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through September 2009.

  15. Pre-solicitation Meeting for the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    Broader source: Energy.gov [DOE]

    This presentation was given to attendees of the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project pre-solicitation meeting held in Detroit, Michigan, on March 19, 2003.

  16. An Economical Micro-Car Testbed for Validation of Cooperative Control Strategies

    E-Print Network [OSTI]

    Bertozzi, Andrea L.

    - controlled cars. The Position Tracking System includes a 1Dept. of Electrical Engineering, UniversityAn Economical Micro-Car Testbed for Validation of Cooperative Control Strategies Chung H. Hsieh1-- This paper describes the design of an economical cooperative control testbed using 1/64 size micro-car

  17. Article Revue XXX DESIGN AND VALIDATION OF A PRODUCT-DRIVEN CONTROL SYSTEM BASED ON A

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Author manuscript, published in "Production Planning & Control (2009) 142-156" DOI : 10.1080/09537280902Article Revue XXX 1 DESIGN AND VALIDATION OF A PRODUCT-DRIVEN CONTROL SYSTEM BASED ON A SIX SIGMA Driven System (PDS) concept can be seen as an innovative control concept that advocates that a product

  18. Dual-UEGO Active Catalyst Control for Emissions Reduction: Design and Experimental Validation

    E-Print Network [OSTI]

    Grizzle, Jessy W.

    Dual-UEGO Active Catalyst Control for Emissions Reduction: Design and Experimental Validation are used to measure air-fuel ratio upstream and downstream of each catalyst. A series controller on the basis of measured feedgas air-fuel ratio, while the downstream controller uses the feedgas and post

  19. Using a Research Simulator for Validating Control Room Modernization Concepts

    SciTech Connect (OSTI)

    Ronald L. Boring; Vivek Agarwal; Julius J. Persensky; Jeffrey C. Joe

    2012-05-01

    The Light Water Reactor Sustainability Program is a research, development, and deployment program sponsored by the United States Department of Energy. The program is operated in close collaboration with industry research and development programs to provide the technical foundations for licensing and managing the long-term, safe, and economical operation of nuclear power plants that are currently in operation. Advanced instrumentation and control (I&C) technologies are needed to support the continued safe and reliable production of power from nuclear energy systems during sustained periods of operation up to and beyond their expected licensed lifetime. This requires that new capabilities to achieve process control be developed and eventually implemented in existing nuclear control rooms. It also requires that approaches be developed and proven to achieve sustainability of I&C systems throughout the period of extended operation. Idaho National Laboratory (INL) is working closely with nuclear utilities to develop technologies and solutions to help ensure the safe life extension of current reactors. One of the main areas of focus is control room modernization. Current analog control rooms are growing obsolete, and it is difficult for utilities to maintain them. Using its reconfigurable control room simulator adapted from a training simulator, INL serves as a neutral test bed for implementing new control room system technologies and assisting in control room modernization efforts across.

  20. Experimental Validation of a Resilient Monitoring and Control System

    SciTech Connect (OSTI)

    Wen-Chiao Lin; Kris R. E. Villez; Humberto E. Garcia

    2014-05-01

    Complex, high performance, engineering systems have to be closely monitored and controlled to ensure safe operation and protect public from potential hazards. One of the main challenges in designing monitoring and control algorithms for these systems is that sensors and actuators may be malfunctioning due to malicious or natural causes. To address this challenge, this paper addresses a resilient monitoring and control (ReMAC) system by expanding previously developed resilient condition assessment monitoring systems and Kalman filter-based diagnostic methods and integrating them with a supervisory controller developed here. While the monitoring and diagnostic algorithms assess plant cyber and physical health conditions, the supervisory controller selects, from a set of candidates, the best controller based on the current plant health assessments. To experimentally demonstrate its enhanced performance, the developed ReMAC system is then used for monitoring and control of a chemical reactor with a water cooling system in a hardware-in-the-loop setting, where the reactor is computer simulated and the water cooling system is implemented by a machine condition monitoring testbed at Idaho National Laboratory. Results show that the ReMAC system is able to make correct plant health assessments despite sensor malfunctioning due to cyber attacks and make decisions that achieve best control actions despite possible actuator malfunctioning. Monitoring challenges caused by mismatches between assumed system component models and actual measurements are also identified for future work.

  1. Methodology for Assessing Radiation Detectors Used by Emergency Responders

    SciTech Connect (OSTI)

    Piotr Wasiolek; April Simpson

    2008-03-01

    The threat of weapons of mass destruction terrorism resulted in the U.S. Department of Homeland Security deploying large quantities of radiation detectors throughout the emergency responder community. However, emergency responders specific needs were not always met by standard health physics instrumentation used in radiation facilities. Several American National Standards Institute standards were developed and approved to evaluate the technical capabilities of detection equipment. Establishing technical capability is a critical step, but it is equally important to emergency responders that the instruments are easy to operate and can withstand the rugged situations they encounter. The System Assessment and Validation for Emergency Responders (SAVER) Program (managed by the U.S. Department of Homeland Security, Office of Grants and Training, Systems Support Division) focuses predominantly on the usability, ergonomics, readability, and other features of the detectors, rather than performance controlled by industry standards and the manufacturers. National Security Technologies, LLC, as a SAVER Technical Agent, conducts equipment evaluations using active emergency responders who are familiar with the detection equipment and knowledgeable of situations encountered in the field, which provides more relevant data to emergency responders.

  2. Physical control oriented model of large scale refrigerators to synthesize advanced control schemes. Design, validation, and first control results

    SciTech Connect (OSTI)

    Bonne, François; Bonnay, Patrick [INAC, SBT, UMR-E 9004 CEA/UJF-Grenoble, 17 rue des Martyrs, 38054 Grenoble (France); Alamir, Mazen [Gipsa-Lab, Control Systems Department, CNRS-University of Grenoble, 11, rue des Mathématiques, BP 46, 38402 Saint Martin d'Hères (France)

    2014-01-29

    In this paper, a physical method to obtain control-oriented dynamical models of large scale cryogenic refrigerators is proposed, in order to synthesize model-based advanced control schemes. These schemes aim to replace classical user experience designed approaches usually based on many independent PI controllers. This is particularly useful in the case where cryoplants are submitted to large pulsed thermal loads, expected to take place in the cryogenic cooling systems of future fusion reactors such as the International Thermonuclear Experimental Reactor (ITER) or the Japan Torus-60 Super Advanced Fusion Experiment (JT-60SA). Advanced control schemes lead to a better perturbation immunity and rejection, to offer a safer utilization of cryoplants. The paper gives details on how basic components used in the field of large scale helium refrigeration (especially those present on the 400W @1.8K helium test facility at CEA-Grenoble) are modeled and assembled to obtain the complete dynamic description of controllable subsystems of the refrigerator (controllable subsystems are namely the Joule-Thompson Cycle, the Brayton Cycle, the Liquid Nitrogen Precooling Unit and the Warm Compression Station). The complete 400W @1.8K (in the 400W @4.4K configuration) helium test facility model is then validated against experimental data and the optimal control of both the Joule-Thompson valve and the turbine valve is proposed, to stabilize the plant under highly variable thermals loads. This work is partially supported through the European Fusion Development Agreement (EFDA) Goal Oriented Training Program, task agreement WP10-GOT-GIRO.

  3. responding to emergencies

    National Nuclear Security Administration (NNSA)

    1%2A en Responding to Emergencies http:www.nnsa.energy.govaboutusourprogramsemergencyoperationscounterterrorismrespondingtoemergencies

  4. Responder Technology Alert Monthly

    E-Print Network [OSTI]

    PNNL-24014 Responder Technology Alert Monthly (Oct-Nov 2014) January 2015 JF Upton SL Stein #12;#12;PNNL-24014 Responder Technology Alert Monthly (Oct-Nov 2014) JF Upton SL Stein January 2015 Prepared for the Department of Homeland Security Science and Technology Directorate under Contract HSHQPM-14-X-00058. Pacific

  5. Intelligent Sensor Validation And Sensor Fusion For Reliability And Safety Enhancement In Vehicle Control

    E-Print Network [OSTI]

    Agogino, Alice; Goebel, Kai; Alag, Sanam

    1995-01-01

    A Methodology for Intelligent Sensor Validation, Fusion andA Framework for Intelligent Sensor Validation, SensorA Methodology for Intelligent Sensor Validation and Fusion

  6. The design of a controllable energy recovery device for solar powered reverse osmosis desalination with experimental validation

    E-Print Network [OSTI]

    Reed, Elizabeth Anne, S.M. Massachusetts Institute of Technology

    2012-01-01

    The purpose of this thesis is to design and validate a controllable energy recovery device with application to photovoltaic powered reverse osmosis (PVRO). The energy consumption of a reverse osmosis plant depends significantly ...

  7. Criticality Safety Basics for INL Emergency Responders

    SciTech Connect (OSTI)

    Valerie L. Putman

    2012-08-01

    This document is a modular self-study guide about criticality safety principles for Idaho National Laboratory emergency responders. This guide provides basic criticality safety information for people who, in response to an emergency, might enter an area that contains much fissionable (or fissile) material. The information should help responders understand unique factors that might be important in responding to a criticality accident or in preventing a criticality accident while responding to a different emergency.

    This study guide specifically supplements web-based training for firefighters (0INL1226) and includes information for other Idaho National Laboratory first responders. However, the guide audience also includes other first responders such as radiological control personnel.

    For interested readers, this guide includes clearly marked additional information that will not be included on tests. The additional information includes historical examples (Been there. Done that.), as well as facts and more in-depth information (Did you know …).

    INL criticality safety personnel revise this guide as needed to reflect program changes, user requests, and better information. Revision 0, issued May 2007, established the basic text. Revision 1 incorporates operation, program, and training changes implemented since 2007. Revision 1 increases focus on first responders because later responders are more likely to have more assistance and guidance from facility personnel and subject matter experts. Revision 1 also completely reorganized the training to better emphasize physical concepts behind the criticality controls that help keep emergency responders safe. The changes are based on and consistent with changes made to course 0INL1226.

  8. Responds to Hurricane Sandy

    E-Print Network [OSTI]

    US Army Corps of Engineers

    and Control Vehicle that was parked in Battery Park near the Staten Island Ferry Terminal in the immediate Editing and Design Chris Gardner Christopher.P.Gardner@ usace.army.mil Graphics and Images Daniel Desmet. 29, 2012, I was standing in Battery Park watching the nine-foot swells from Hurricane Sandy barely

  9. Human factors design, verification, and validation for two types of control room upgrades at a nuclear power plant

    SciTech Connect (OSTI)

    Boring, Laurids Ronald

    2014-10-01

    This paper describes the NUREG-0711 based human factors engineering (HFE) phases and associated elements required to support design, verification and validation (V&V), and implementation of a new plant process computer (PPC) and turbine control system (TCS) at a representative nuclear power plant. This paper reviews ways to take a human-system interface (HSI) specification and use it when migrating legacy PPC displays or designing displays with new functionality. These displays undergo iterative usability testing during the design phase and then undergo an integrated system validation (ISV) in a full scope control room training simulator. Following the successful demonstration of operator performance with the systems during the ISV, the new system is implemented at the plant, first in the training simulator and then in the main control room.

  10. Responder Technology Alert (February 2015)

    E-Print Network [OSTI]

    PNNL-24227 Responder Technology Alert (February 2015) April 2015 JF Upton SL Stein #12;#12;PNNL-24227 Responder Technology Alert (February 2015) JF Upton SL Stein April 2015 Prepared for the Department of Homeland Security Science and Technology Directorate under Contract HSHQPM-14-X-00058. Pacific

  11. Responder Technology Alert (April 2015)

    E-Print Network [OSTI]

    PNNL-24326 Responder Technology Alert (April 2015) May 2015 JF Upton SL Stein #12;#12;PNNL-24326 Responder Technology Alert (April 2015) JF Upton SL Stein May 2015 Prepared for the Department of Homeland Security Science and Technology Directorate under Contract HSHQPM-14-X-00058. Pacific Northwest National

  12. First Responders and Criticality Accidents

    SciTech Connect (OSTI)

    Valerie L. Putman; Douglas M. Minnema

    2005-11-01

    Nuclear criticality accident descriptions typically include, but do not focus on, information useful to first responders. We studied these accidents, noting characteristics to help (1) first responders prepare for such an event and (2) emergency drill planners develop appropriate simulations for training. We also provide recommendations to help people prepare for such events in the future.

  13. BEYOND INTEGRATED SYSTEM VALIDATION: USE OF A CONTROL ROOM TRAINING SIMULATOR FOR PROOF-OF-CONCEPT INTERFACE DEVELOPMENT

    SciTech Connect (OSTI)

    Ronald Boring; Vivek Agarwal

    2012-07-01

    This paper provides background on a reconfigurable control room simulator for nuclear power plants. The main control rooms in current nuclear power plants feature analog technology that is growing obsolete. The need to upgrade control rooms serves the practical need of maintainability as well as the opportunity to implement newer digital technologies with added functionality. There currently exists no dedicated research simulator for use in human factors design and evaluation activities for nuclear power plants in the US. The new research simulator discussed in this paper provides a test bed in which operator performance on new control room concepts can be benchmarked against existing control rooms and in which new technologies can be validated for safety and usability prior to deployment.

  14. Development and Validation of Aggregated Models for Thermostatic Controlled Loads with Demand Response

    SciTech Connect (OSTI)

    Kalsi, Karanjit; Elizondo, Marcelo A.; Fuller, Jason C.; Lu, Shuai; Chassin, David P.

    2012-01-04

    Demand response is playing an increasingly important role in smart grid research and technologies being examined in recently undertaken demonstration projects. The behavior of load as it is affected by various load control strategies is important to understanding the degree to which different classes of end-use load can contribute to demand response programs at various times. This paper focuses on developing aggregated control models for a population of thermostatically controlled loads. The effects of demand response on the load population dynamics are investigated.

  15. Experiential lighting : development and validation of perception-based lighting controls

    E-Print Network [OSTI]

    Aldrich, Matthew (Matthew Henry)

    2014-01-01

    Lighting, and its emergence as a digital and networked medium, represents an ideal platform for conducting research on both sensor and human-derived methods of control. Notably, solid-state lighting makes possible the ...

  16. Final Technical Report: Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    SciTech Connect (OSTI)

    Ronald Grasman

    2011-12-31

    This report summarizes the work conducted under U.S. Department of Energy (DOE) under contract DE-FC36-04GO14285 by Mercedes-Benz & Research Development, North America (MBRDNA), Chrysler, Daimler, Mercedes Benz USA (MBUSA), BP, DTE Energy and NextEnergy to validate fuel cell technologies for infrastructure, transportation as well as assess technology and commercial readiness for the market. The Mercedes Team, together with its partners, tested the technology by operating and fueling hydrogen fuel cell vehicles under real world conditions in varying climate, terrain and driving conditions. Vehicle and infrastructure data was collected to monitor the progress toward the hydrogen vehicle and infrastructure performance targets of $2.00 to 3.00/gge hydrogen production cost and 2,000-hour fuel cell durability. Finally, to prepare the public for a hydrogen economy, outreach activities were designed to promote awareness and acceptance of hydrogen technology. DTE, BP and NextEnergy established hydrogen filling stations using multiple technologies for on-site hydrogen generation, storage and dispensing. DTE established a hydrogen station in Southfield, Michigan while NextEnergy and BP worked together to construct one hydrogen station in Detroit. BP constructed another fueling station in Burbank, California and provided a full-time hydrogen trailer at San Francisco, California and a hydrogen station located at Los Angeles International Airport in Southern, California. Stations were operated between 2005 and 2011. The Team deployed 30 Gen I Fuel Cell Vehicles (FCVs) in the beginning of the project. While 28 Gen I F-CELLs used the A-Class platform, the remaining 2 were Sprinter delivery vans. Fuel cell vehicles were operated by external customers for real-world operations in various regions (ecosystems) to capture various driving patterns and climate conditions (hot, moderate and cold). External operators consisted of F-CELL partner organizations in California and Michigan ranging from governmental organizations, for-profit to and non-profit entities. All vehicles were equipped with a data acquisition system that automatically collected statistically relevant data for submission to National Renewable Energy Laboratory (NREL), which monitored the progress of the fuel cell vehicles against the DOE technology validation milestones. The Mercedes Team also provided data from Gen-II vehicles under the similar operations as Gen I vehicles to compare technology maturity during program duration.

  17. Experimental Validation of Control Designs for Low-Loss Active Magnetic Bearings

    E-Print Network [OSTI]

    Tsiotras, Panagiotis

    , hard disk drives, high-speed centrifuges Electrical Engineer, Space Vehicles Directorate, 3550 Aberdeen in flywheel batteries (FWBs) and advanced control moment gyroscopes (CMGs).6 In a FWB, kinetic energy of specific energy and typically outperform chemical batteries in terms of specific power. Advanced energy

  18. Experimental validation of an autonomous control system on a mobile robot platform

    E-Print Network [OSTI]

    Ren, Wei

    .-S. Sun, R. Beard and T. McLain Abstract: An autonomous control system designed for a non avoidance, real-time trajectory generation and trajectory tracking. Both the wheeled mobile robot as either stabilisation or tracking. Based on Brockett's necessary condition for feed- back stabilisation [1

  19. Numerical Verification and Experimental Validation of Sliding Mode Control Design for

    E-Print Network [OSTI]

    Kearfott, R. Baker

    Thermal SOFC Models Andreas Rauh, Luise Senkel, Thomas D¨otschel , Harald Aschemann Chair of Mechatronics@inf.uni-due.de Abstract The design of reliable and robust control strategies for the automatized operation of SOFC systems for an SOFC system that is available at the Chair of Mechatronics at the University of Rostock. Keywords

  20. Model based multivariable controller for large scale compression stations. Design and experimental validation on the LHC 18KW cryorefrigerator

    SciTech Connect (OSTI)

    Bonne, François; Bonnay, Patrick [INAC, SBT, UMR-E 9004 CEA/UJF-Grenoble, 17 rue des Martyrs, 38054 Grenoble (France); Alamir, Mazen [Gipsa-Lab, Control Systems Department, CNRS-University of Grenoble, 11, rue des Mathématiques, BP 46, 38402 Saint Martin d'Hères (France); Bradu, Benjamin [CERN, CH-1211 Genève 23 (Switzerland)

    2014-01-29

    In this paper, a multivariable model-based non-linear controller for Warm Compression Stations (WCS) is proposed. The strategy is to replace all the PID loops controlling the WCS with an optimally designed model-based multivariable loop. This new strategy leads to high stability and fast disturbance rejection such as those induced by a turbine or a compressor stop, a key-aspect in the case of large scale cryogenic refrigeration. The proposed control scheme can be used to have precise control of every pressure in normal operation or to stabilize and control the cryoplant under high variation of thermal loads (such as a pulsed heat load expected to take place in future fusion reactors such as those expected in the cryogenic cooling systems of the International Thermonuclear Experimental Reactor ITER or the Japan Torus-60 Super Advanced fusion experiment JT-60SA). The paper details how to set the WCS model up to synthesize the Linear Quadratic Optimal feedback gain and how to use it. After preliminary tuning at CEA-Grenoble on the 400W@1.8K helium test facility, the controller has been implemented on a Schneider PLC and fully tested first on the CERN's real-time simulator. Then, it was experimentally validated on a real CERN cryoplant. The efficiency of the solution is experimentally assessed using a reasonable operating scenario of start and stop of compressors and cryogenic turbines. This work is partially supported through the European Fusion Development Agreement (EFDA) Goal Oriented Training Program, task agreement WP10-GOT-GIRO.

  1. Emergency Responder Radioactive Material Quick Reference Sheet

    Broader source: Energy.gov [DOE]

    Transportation Emergency Preparedness Program (TEPP) Emergency Responder Radioactive Material Quick Reference Sheet

  2. Biodetection Technologies for First Responders

    SciTech Connect (OSTI)

    Baird, Cheryl L.; Seiner, Derrick R.; Ozanich, Richard M.; Bartholomew, Rachel A.; Colburn, Heather A.; Straub, Tim M.; Bruckner-Lea, Cindy J.

    2012-10-24

    In a white powder scenario, there are a large number of field-deployable assays that can be used to determine if the suspicious substance contains biological material and warrants further investigation. This report summarizes commercially available technologies that are considered hand portable and can be used by first responders in the field. This is not meant to be an exhaustive list, nor do the authors endorse any of the technologies described herein. Rather, it is meant to provide useful information about available technologies to help end-users make informed decisions about biodetection technology procurement and use.

  3. Responder Technology Alert (February 2015)

    Office of Scientific and Technical Information (OSTI)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield MunicipalTechnical Report:Speeding accessby aLEDSpeeding FINAL ProgressTechnicalPNNL-24227 Responder

  4. LANL responds to radiological incident

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesse Bergkamp Graduate student Subtask2 J.N.open to badge holdersLANL responds

  5. Planning Considerations Coordinate with local law enforcement & first responders

    E-Print Network [OSTI]

    Patzek, Tadeusz W.

    Planning Considerations Coordinate with local law enforcement & first responders to ensure smooth to in this document as "Site Decision Maker(s)") Select Evacuation Teams and Search Teams Develop training plan Determine search procedures Designate control center locations Plan for emergency assistance (police, fire

  6. GENERAL INFORMATION A0. Respondent Information (Not for Publication)

    E-Print Network [OSTI]

    Bou-Zeid, Elie

    to which applications should be sent, please provide: A2. Source of institutional control (check one only categories as of the institution's official fall reporting date or as of October 15, 2007. FULL-TIME PARTGENERAL INFORMATION A0. Respondent Information (Not for Publication) Name Jonathan R. LeBouef Title

  7. Responder Technology Alert Monthly (January 2015)

    SciTech Connect (OSTI)

    Upton, Jaki F.; Stein, Steven L.

    2015-02-01

    As part of technology foraging for the Responder Technology Alliance, established by the Department of Homeland Science and Technologies First Responders Group, this report summarizes technologies that are relevant in the area of “wearables,” with the potential for use by first responders. The content was collected over the previous month(s) and reproduced from a general Internet search using the term wearables. Additional information is available at the websites provided. This report is not meant to be an exhaustive list nor an endorsement of any technology described herein. Rather, it is meant to provide useful information about current developments in the areas wearable technology.

  8. Emergency Responder Radioactive Material Quick Reference Sheet

    Broader source: Energy.gov [DOE]

    This job aid is a quick reference to assist emergency responders in identifying preliminary safety precautions that should be taken during the initial response phase after arrival at the scene of...

  9. Colorado State Forest Service SB09-020 --Responsibility for Responding to Wildland Fires

    E-Print Network [OSTI]

    Colorado State Forest Service SB09-020 -- Responsibility for Responding to Wildland Fires Summary, and the Colorado State Forest Service in responding to wildland fires. This legislation organizes the roles Forest Service may assist the sheriff in controlling or extinguishing such fires, and may assume command

  10. Respond to the article | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7,Breakout Sessions Notes andRespond toRespond

  11. A controlled distributed parameter model for a fluid-flexible structure system: numerical simulations and experiment validations

    E-Print Network [OSTI]

    Baudouin, Lucie

    A controlled distributed parameter model for a fluid-flexible structure system: numerical consider the problem of active reduction of vibrations in a fluid-flexible structure system and the sloshing of the fuel inside the wing's tank. The control is performed using piezoelectric patches

  12. Respond to the article | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7,Breakout Sessions Notes andRespond to theRespond to the

  13. Respond to the article | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7,Breakout Sessions Notes andRespond to theRespond to

  14. Respond to the article | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7,Breakout Sessions Notes andRespond to theRespond

  15. Respond to the article | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7,Breakout Sessions Notes andRespond to theRespond19,4,

  16. Respond to the article | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7,Breakout Sessions Notes andRespond toRespond to the

  17. Respond to the article | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7,Breakout Sessions Notes andRespond toRespond to

  18. Respond to the article | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7,Breakout Sessions Notes andRespond toRespond to1, 2014

  19. Respond to the article | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7,Breakout Sessions Notes andRespond toRespond to1,

  20. Respond to the article | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7,Breakout Sessions Notes andRespond toRespond to1,7,

  1. Respond to the article | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7,Breakout Sessions Notes andRespond toRespond3, 2014 -

  2. Respond to the article | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7,Breakout Sessions Notes andRespond toRespond3, 2014 -4,

  3. Respond to the article | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7,Breakout Sessions Notes andRespond toRespond3, 2014

  4. Respond to the article | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7,Breakout Sessions Notes andRespond toRespond3, 20147,

  5. First Responder Initial Response Procedure | Department of Energy

    Office of Environmental Management (EM)

    Procedure First Responder Initial Response Procedure The purpose of this response flow chart is to provide first responders with guidance for response to a transportation...

  6. Homeowners: Respond to Natural Gas Disruptions | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Natural Gas Disruptions Homeowners: Respond to Natural Gas Disruptions Homeowners: Respond to Natural Gas Disruptions Because natural gas is distributed through underground...

  7. Local Leaders: Respond to Fuel Shortages | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Fuel Shortages Ensuring adequate fuel supplies is a key component in responding to energy emergencies. Fuel powers backup generators and allows emergency responders and...

  8. Energy Department Emergency Response Team Ready to Respond to...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Emergency Response Team Ready to Respond to Hurricane Irene Energy Department Emergency Response Team Ready to Respond to Hurricane Irene August 26, 2011 - 12:15pm Addthis...

  9. Respond to the article | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7,Breakout Sessions Notes andRespond to the article

  10. Respond to the article | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7,Breakout Sessions Notes andRespond to the

  11. Respond to the article | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7,Breakout Sessions Notes andRespond to

  12. Training For Radiation Emergencies, First Responder Operations- Course Presentation

    Broader source: Energy.gov [DOE]

    Presentation slides use in the Training For Radiation Emergencies, First Responder Operations refresher training course.

  13. Controlled Hydrogen Fleet and Infrastructure Demonstration and...

    Energy Savers [EERE]

    Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project 2009 DOE...

  14. Controlled Hydrogen Fleet and Infrastructure Demonstration and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Solicitation Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project...

  15. SANSMIC Validation.

    SciTech Connect (OSTI)

    Weber, Paula D.; Rudeen, David Keith; Lord, David

    2014-08-01

    SANSMIC is solution mining software that was developed and utilized by SNL in its role as geotechnical advisor to the US DOE SPR for planning purposes. Three SANSMIC leach modes - withdrawal, direct, and reverse leach - have been revalidated with multiple test cases for each mode. The withdrawal mode was validated using high quality data from recent leach activity while the direct and reverse modes utilized data from historical cavern completion reports. Withdrawal results compared very well with observed data, including the location and size of shelves due to string breaks with relative leached volume differences ranging from 6 - 10% and relative radius differences from 1.5 - 3%. Profile comparisons for the direct mode were very good with relative leached volume differences ranging from 6 - 12% and relative radius differences from 5 - 7%. First, second, and third reverse configurations were simulated in order to validate SANSMIC over a range of relative hanging string and OBI locations. The first-reverse was simulated reasonably well with relative leached volume differences ranging from 1 - 9% and relative radius differences from 5 - 12%. The second-reverse mode showed the largest discrepancies in leach profile. Leached volume differences ranged from 8 - 12% and relative radius differences from 1 - 10%. In the third-reverse, relative leached volume differences ranged from 10 - 13% and relative radius differences were ~4 %. Comparisons to historical reports were quite good, indicating that SANSMIC is essentially the same as documented and validated in the early 1980's.

  16. Biodetection Technologies for First Responders: 2014 Edition

    SciTech Connect (OSTI)

    Ozanich, Richard M.; Baird, Cheryl L.; Bartholomew, Rachel A.; Colburn, Heather A.; Straub, Tim M.; Bruckner-Lea, Cindy J.

    2014-03-28

    This report summarizes commercially-available, hand-portable technologies that can be used by first responders in the field. This is not meant to be an exhaustive list, nor an endorsement of any technology described herein. Rather, this report is meant to provide useful information about available technologies to help end-users make informed decisions about biodetection technology procurement and use. Information listed in this report is primarily vendor-provided; however, where possible it has been supplemented with additional information obtained from publications, reports, and websites. Manufacturers were given the chance to review summaries of their technologies from August through November 2013 to verify the accuracy of technical specifications, available references, and pricing.

  17. Utilities respond to nuclear station blackout rule

    SciTech Connect (OSTI)

    Rubin, A.M.; Beasley, B.; Tenera, L.P

    1990-02-01

    The authors discuss how nuclear plants in the United States have taken actions to respond to the NRC Station Blackout Rule, 10CFR50.63. The rule requires that each light water cooled nuclear power plant licensed to operate must be able to withstand for a specified duration and recover from a station blackout. Station blackout is defined as the complete loss of a-c power to the essential and non-essential switch-gear buses in a nuclear power plant. A station blackout results from the loss of all off-site power as well as the on-site emergency a-c power system. There are two basic approaches to meeting the station blackout rule. One is to cope with a station blackout independent of a-c power. Coping, as it is called, means the ability of a plant to achieve and maintain a safe shutdown condition. The second approach is to provide an alternate a-c power source (AAC).

  18. Common Data Set 2011-2012 A0 Respondent Information (Not for Publication)

    E-Print Network [OSTI]

    the publishers further refine CDS items. http://admissions.msu.edu/apply/asp Source of institutional control of undergraduate students for each of the following categories as of the institution's official fall reporting dateCommon Data Set 2011-2012 A0 Respondent Information (Not for Publication) A0 Name: Kyle Sweitzer A0

  19. Webinar: National Hydrogen Safety Training Resource for Emergency Responders

    Office of Energy Efficiency and Renewable Energy (EERE)

    Text version and video recording of the Fuel Cell Technologies Office webinar titled "National Hydrogen Safety Training Resource for Emergency Responders," originally presented on March 24, 2015.

  20. National Hydrogen Safety Training Resource for Emergency Responders...

    Broader source: Energy.gov (indexed) [DOE]

    slides from the Fuel Cell Technologies Office webinar "National Hydrogen Safety Training Resource for Emergency Responders" held on March 24, 2015. National Hydrogen Safety...

  1. NNSA hosts Illinois emergency responders during technical exchange...

    National Nuclear Security Administration (NNSA)

    responders during an Aerial Measuring System (AMS) Technical Exchange meeting at NNSA's Remote Sensing Laboratory (RSL) in Las Vegas, Nev. The technical exchange consisted of...

  2. Secretary of Energy's First Biennial Report to Congress Responding...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Secretary of Energy's First Biennial Report to Congress Responding to Hydrogen and Fuel Cell Technical Advisory Committee (HTAC) Findings and Recommendations during Fiscal Year...

  3. FIRE Action Plan to Respond to Next Step Options

    E-Print Network [OSTI]

    1 FIRE Action Plan to Respond to Next Step Options Program Advisory Committee Report #2 July 3, 2001 The FIRE Action s are listed among the NSO-PAC2 recommendations. 1. Response to NSO PAC-1 Report Representatives of the FIRE project presented an action plan for how to respond to issues that had been raised

  4. Onsite Wastewater Treatment Systems: Responding to Electrical Power Outages

    E-Print Network [OSTI]

    1 Onsite Wastewater Treatment Systems: Responding to Electrical Power Outages and Floods Bruce The Texas A&M University System Electrical power outages and floods can affect you and your residential power outages and flooding. System Components To properly respond to a disaster, homeowners need to know

  5. Does rationality consist in responding correctly to reasons? John Broome

    E-Print Network [OSTI]

    Fitelson, Branden

    Does rationality consist in responding correctly to reasons? John Broome Journal of Moral form. What does it mean to say that rationality consists in responding correctly to reasons? Partly does not call for a response from you. Your punishment is the responsibility of the authorities

  6. EIA responds to Nature article on shale gas projections

    Reports and Publications (EIA)

    2014-01-01

    EIA has responded to a December 4, 2014 Nature article on projections of shale gas production made by EIA and by the Bureau of Economic Geology of the University of Texas at Austin (BEG/UT) with a letter to the editors of Nature. BEG/UT has also responded to the article in their own letter to the editor.

  7. Data gathering to build and validate small-scale social models for simulation. Two ways: strict control and stake-holders involvement

    E-Print Network [OSTI]

    Tesfatsion, Leigh

    Data gathering to build and validate small-scale social models for simulation. Two ways: strict. Nowadays, it has become a norm to assess results with actually comparable data and to build the hypothesis for the right use of empirical data in the building of models (Moss and Edmonds, 2005). In this paper, we focus

  8. Responder Technology Alert Monthly (Oct-Nov 2014)

    SciTech Connect (OSTI)

    Upton, Jaki F.; Stein, Steven L.

    2015-01-21

    As part of technology foraging for the Responder Technology Alliance, established by the Department of Homeland Science and Technologies First Responders Group, this report summarizes technologies that are relevant in the area of “wearables,” with the potential for use by first responders. The content was collected over the previous month(s) and reproduced from a general Internet search using the term wearables. Additional information is available at the websites provided. This report is not meant to be an exhaustive list nor an endorsement of any technology described herein. Rather, it is meant to provide useful information about current developments in the areas wearable technology.

  9. Patterns for responding to climate in shared-wall housing

    E-Print Network [OSTI]

    Paulos, Susan Kaufmann

    1982-01-01

    Out of the inescapables of building come inspiration for architectural design. Decisions which respond to climate make their mark in design, just as structural requirements, lighting provisions, and the limitations of a ...

  10. Federal policy towards emergency responder interoperability : a path forward

    E-Print Network [OSTI]

    Weir, Tristan John

    2006-01-01

    Emergency responders have suffered from a lack of cross-agency radio communications for the past three decades. After numerous firefighters died in the terrorist attacks of September 11, partially due to a lack of ...

  11. Webinar: National Hydrogen Safety Training Resource for Emergency Responders

    Broader source: Energy.gov [DOE]

    The Energy Department's Fuel Cell Technologies Office announces the launch of a new, free, online national hydrogen safety training resource for emergency responders. This webinar will provide additional details about the emergency response hydrogen training resource.

  12. Responding to Solicitations Under DOE Work For Others Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7,Breakout Sessions Notes andRespondRESPONDING TO

  13. Common Data Set 2012-2013 A0 Respondent Information (Not for Publication)

    E-Print Network [OSTI]

    Weaver, Adam Lee

    ://www.smcvt.edu/Admissions/Apply.aspx Source of institutional control (Check only one): CDS-A Page 1 #12;Common Data Set 2012-2013 A5 Degrees for each of the following categories as of the institution's official fall reporting date or as of OctoberCommon Data Set 2012-2013 A0 Respondent Information (Not for Publication) A0 Name: John Kulhowvick

  14. Radiation belt electrons respond to multiple solar wind inputs

    E-Print Network [OSTI]

    Radiation belt electrons respond to multiple solar wind inputs E. J. Rigler,1 M. Wiltberger,1 and D is clearly valuable from a practical standpoint, but the latter helps build confidence in any physical on the fractional or percent variance of radiation belt electron flux that can be attributed to each different solar

  15. Table of Contents Preparing for and Responding to Drought

    E-Print Network [OSTI]

    3 Table of Contents Preparing for and Responding to Drought WHEN EVERY DROP COuNtsProtecting Public, National Oceanic and Atmospheric Agency, and American Water Works Association. 2010. When every drop counts P r o f e s s i o n A l s #12;#12;Table of Contents Acknowledgments

  16. Training For Radiation Emergencies, First Responder Operations- Student Guide

    Broader source: Energy.gov [DOE]

    The purpose of this program is to provide refresher operations training, as well as in-depth training in radiation, to fire fighters who are currently trained to the National Fire Protection Association (NFPA) Standard for Professional Competence of Responders to Hazardous Materials (NFPA 472).

  17. Training For Radiation Emergencies, First Responder Operations- Instructors Guide

    Broader source: Energy.gov [DOE]

    The purpose of this program is to provide refresher operations training, as well as in-depth training in radiation, to fire fighters who are currently trained to the National Fire Protection Association (NFPA) Standard for Professional Competence of Responders to Hazardous Materials (NFPA 472).

  18. "Designing equipment and buildings to more quickly respond to occupant

    E-Print Network [OSTI]

    Zhigilei, Leonid V.

    prediction system Energy Efficient Smart Buildings In the near future, intelligent buildings"Designing equipment and buildings to more quickly respond to occupant behavior." Kamin Whitehouse University of Virginia Charlottesville, VA 434.982.2211 Whitehouse Research Group Our group is creating smart

  19. U.S. First Responder Safety Training for Advanced Electric Drive...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    First Responder Safety Training for Advanced Electric Drive Vehicle Presentation U.S. First Responder Safety Training for Advanced Electric Drive Vehicle Presentation 2010 DOE...

  20. Apparatus for responding to an anomalous change in downhole pressure

    DOE Patents [OSTI]

    Hall, David R.; Fox, Joe; Wilde, Tyson; Barlow, Jonathan S.

    2010-04-13

    A method of responding to an anomalous change in downhole pressure in a bore hole comprises detecting the anomalous change in downhole pressure, sending a signal along the segmented electromagnetic transmission path, receiving the signal, and performing a automated response. The anomalous change in downhole pressure is detected at a first location along a segmented electromagnetic transmission path, and the segmented electromagnetic transmission path is integrated into the tool string. The signal is received by at least one receiver in communication with the segmented electromagnetic transmission path. The automated response is performed along the tool string. Disclosed is an apparatus for responding to an anomalous change in downhole pressure in a downhole tool string, comprising a segmented electromagnetic transmission path connecting one or more receivers and at least one pressure sensor.

  1. Homeowners: Respond to Power Outages | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Financing Tool Fits the Bill FinancingDepartment ofPower Outages Homeowners: Respond to Power

  2. Challenges for Early Responders to a Nuclear / Radiological Terrorism Incident

    SciTech Connect (OSTI)

    Wells, M.A. [Sacramento Metropolitan Fire District, Sacramento, CA (United States); Stearns, L.J. [Shaw Environmental, Inc, Monroeville, PA (United States); Davie, A.D. [Shaw Environmental, Inc, Alpharetta, GA (United States); Day, E. [PELL Resources Company, Manassas, VA (United States)

    2007-07-01

    Even in the best of circumstances, most municipalities would face severe challenges in providing effective incident response to a large scale radiation release caused by nuclear terrorism or accident. Compounding obvious complexities, the effectiveness of first and early responders to a radiological emergency may also be hampered by an insufficient distribution of radiation detection and monitoring equipment, local policies concerning triage and field decontamination of critical victims, malfunctioning communications, inadequate inter-agency agility, and the psychological 'fear' impact on early responders. This paper examines several issues impeding the early response to nuclear terrorism incidents with specific consideration given to the on-going and forward-thinking preparedness efforts currently being developed in the Sacramento, California region. Specific recommendations are provided addressing hot zone protocols, radiation detection and monitoring equipment, hasty patient packaging techniques, vertically and horizontally integrated pre-event training, mitigating psychological fear, and protocols for the effective 'hand-off' from first responders to subsequent early response-recovery teams. (authors)

  3. Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 with Destructive Validation

    SciTech Connect (OSTI)

    Crawford, Susan L.; Cinson, Anthony D.; MacFarlan, Paul J.; Hanson, Brady D.; Mathews, Royce

    2012-08-01

    The objective of this investigation was to evaluate the efficacy of ultrasonic testing (UT) for primary water leak path assessments of reactor pressure vessel (RPV) upper head penetrations. Operating reactors have experienced leakage when stress corrosion cracking of nickel-based alloy penetrations allowed primary water into the annulus of the interference fit between the penetration and the low-alloy steel RPV head. In this investigation, UT leak path data were acquired for an Alloy 600 control rod drive mechanism nozzle penetration, referred to as Nozzle 63, which was removed from the North Anna Unit 2 reactor when the RPV head was replaced in 2002. In-service inspection prior to the head replacement indicated that Nozzle 63 had a probable leakage path through the interference fit region. Nozzle 63 was examined using a phased-array UT probe with a 5.0-MHz, eight-element annular array. Immersion data were acquired from the nozzle inner diameter surface. The UT data were interpreted by comparing to responses measured on a mockup penetration with known features. Following acquisition of the UT data, Nozzle 63 was destructively examined to determine if the features identified in the UT examination, including leakage paths and crystalline boric acid deposits, could be visually confirmed. Additional measurements of boric acid deposit thickness and low-alloy steel wastage were made to assess how these factors affect the UT response. The implications of these findings for interpreting UT leak path data are described.

  4. Validation of updated neutronic calculation models proposed for Atucha-II PHWR. Part I: Benchmark comparisons of WIMS-D5 and DRAGON cell and control rod parameters with MCNP5

    SciTech Connect (OSTI)

    Mollerach, R. [Nucleoelectrica Argentina S.A., Arribenos 3619, Buenos Aires 1429 (Argentina); Leszczynski, F. [Comision Nacional de Energia Atomica, Avenida del Libertador 8250, Buenos Aires 1429 (Argentina); Fink, J. [Nucleoelectrica Argentina S.A., Arribenos 3619, Buenos Aires 1429 (Argentina)

    2006-07-01

    In 2005 the Argentine Government took the decision to complete the construction of the Atucha-II nuclear power plant, which has been progressing slowly during the last ten years. Atucha-II is a 745 MWe nuclear station moderated and cooled with heavy water, of German (Siemens) design located in Argentina. It has a pressure-vessel design with 451 vertical coolant channels, and the fuel assemblies (FA) are clusters of 37 natural UO{sub 2} rods with an active length of 530 cm. For the reactor physics area, a revision and update calculation methods and models (cell, supercell and reactor) was recently carried out covering cell, supercell (control rod) and core calculations. As a validation of the new models some benchmark comparisons were done with Monte Carlo calculations with MCNP5. This paper presents comparisons of cell and supercell benchmark problems based on a slightly idealized model of the Atucha-I core obtained with the WIMS-D5 and DRAGON codes with MCNP5 results. The Atucha-I core was selected because it is smaller, similar from a neutronic point of view, and more symmetric than Atucha-II Cell parameters compared include cell k-infinity, relative power levels of the different rings of fuel rods, and some two-group macroscopic cross sections. Supercell comparisons include supercell k-infinity changes due to the control rods (tubes) of steel and hafnium. (authors)

  5. Development of the ANL plant dynamics code and control strategies for the supercritical carbon dioxide Brayton cycle and code validation with data from the Sandia small-scale supercritical carbon dioxide Brayton cycle test loop.

    SciTech Connect (OSTI)

    Moisseytsev, A.; Sienicki, J. J.

    2011-11-07

    Significant progress has been made in the ongoing development of the Argonne National Laboratory (ANL) Plant Dynamics Code (PDC), the ongoing investigation and development of control strategies, and the analysis of system transient behavior for supercritical carbon dioxide (S-CO{sub 2}) Brayton cycles. Several code modifications have been introduced during FY2011 to extend the range of applicability of the PDC and to improve its calculational stability and speed. A new and innovative approach was developed to couple the Plant Dynamics Code for S-CO{sub 2} cycle calculations with SAS4A/SASSYS-1 Liquid Metal Reactor Code System calculations for the transient system level behavior on the reactor side of a Sodium-Cooled Fast Reactor (SFR) or Lead-Cooled Fast Reactor (LFR). The new code system allows use of the full capabilities of both codes such that whole-plant transients can now be simulated without additional user interaction. Several other code modifications, including the introduction of compressor surge control, a new approach for determining the solution time step for efficient computational speed, an updated treatment of S-CO{sub 2} cycle flow mergers and splits, a modified enthalpy equation to improve the treatment of negative flow, and a revised solution of the reactor heat exchanger (RHX) equations coupling the S-CO{sub 2} cycle to the reactor, were introduced to the PDC in FY2011. All of these modifications have improved the code computational stability and computational speed, while not significantly affecting the results of transient calculations. The improved PDC was used to continue the investigation of S-CO{sub 2} cycle control and transient behavior. The coupled PDC-SAS4A/SASSYS-1 code capability was used to study the dynamic characteristics of a S-CO{sub 2} cycle coupled to a SFR plant. Cycle control was investigated in terms of the ability of the cycle to respond to a linear reduction in the electrical grid demand from 100% to 0% at a rate of 5%/minute. It was determined that utilization of turbine throttling control below 50% load improves the cycle efficiency significantly. Consequently, the cycle control strategy has been updated to include turbine throttle valve control. The new control strategy still relies on inventory control in the 50%-90% load range and turbine bypass for fine and fast generator output adjustments, but it now also includes turbine throttling control in the 0%-50% load range. In an attempt to investigate the feasibility of using the S-CO{sub 2} cycle for normal decay heat removal from the reactor, the cycle control study was extended beyond the investigation of normal load following. It was shown that such operation is possible with the extension of the inventory and the turbine throttling controls. However, the cycle operation in this range is calculated to be so inefficient that energy would need to be supplied from the electrical grid assuming that the generator could be capable of being operated in a motoring mode with an input electrical energy from the grid having a magnitude of about 20% of the nominal plant output electrical power level in order to maintain circulation of the CO{sub 2} in the cycle. The work on investigation of cycle operation at low power level will be continued in the future. In addition to the cycle control study, the coupled PDC-SAS4A/SASSYS-1 code system was also used to simulate thermal transients in the sodium-to-CO{sub 2} heat exchanger. Several possible conditions with the potential to introduce significant changes to the heat exchanger temperatures were identified and simulated. The conditions range from reactor scram and primary sodium pump failure or intermediate sodium pump failure on the reactor side to pipe breaks and valve malfunctions on the S-CO{sub 2} side. It was found that the maximum possible rate of the heat exchanger wall temperature change for the particular heat exchanger design assumed is limited to {+-}7 C/s for less than 10 seconds. Modeling in the Plant Dynamics Code has been compared with available data from the Sandia Natio

  6. Business Owners: Respond to an Energy Emergency | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann JacksonDepartment|Marketing, LLCEfficiency | DepartmentEnergy CHINO,UtilityRespond to

  7. Rooftop unit embedded diagnostics: Automated fault detection and diagnostics (AFDD) development, field testing and validation

    SciTech Connect (OSTI)

    Katipamula, Srinivas; Kim, Woohyun; Lutes, Robert G.; Underhill, Ronald M.

    2015-09-30

    This report documents the development, testing and field validation of the integrated AFDD and advanced rooftop unit (RTU) controls using a single controller in buildings.

  8. A Simple Evacuation Modeling and Simulation Tool for First Responders

    SciTech Connect (OSTI)

    Koch, Daniel B [ORNL; Payne, Patricia W [ORNL

    2015-01-01

    Although modeling and simulation of mass evacuations during a natural or man-made disaster is an on-going and vigorous area of study, tool adoption by front-line first responders is uneven. Some of the factors that account for this situation include cost and complexity of the software. For several years, Oak Ridge National Laboratory has been actively developing the free Incident Management Preparedness and Coordination Toolkit (IMPACT) to address these issues. One of the components of IMPACT is a multi-agent simulation module for area-based and path-based evacuations. The user interface is designed so that anyone familiar with typical computer drawing tools can quickly author a geospatially-correct evacuation visualization suitable for table-top exercises. Since IMPACT is designed for use in the field where network communications may not be available, quick on-site evacuation alternatives can be evaluated to keep pace with a fluid threat situation. Realism is enhanced by incorporating collision avoidance into the simulation. Statistics are gathered as the simulation unfolds, including most importantly time-to-evacuate, to help first responders choose the best course of action.

  9. Validating Energy Measures 

    E-Print Network [OSTI]

    Chari, S.; Thomas, D.

    1994-01-01

    Energy measurements play a very important role in a detailed energy analysis. The role is more important in industrial processes where wide variations of process conditions exist. Valid energy measurements make the decision making process easier...

  10. Verification and validation benchmarks.

    SciTech Connect (OSTI)

    Oberkampf, William Louis; Trucano, Timothy Guy

    2007-02-01

    Verification and validation (V&V) are the primary means to assess the accuracy and reliability of computational simulations. V&V methods and procedures have fundamentally improved the credibility of simulations in several high-consequence fields, such as nuclear reactor safety, underground nuclear waste storage, and nuclear weapon safety. Although the terminology is not uniform across engineering disciplines, code verification deals with assessing the reliability of the software coding, and solution verification deals with assessing the numerical accuracy of the solution to a computational model. Validation addresses the physics modeling accuracy of a computational simulation by comparing the computational results with experimental data. Code verification benchmarks and validation benchmarks have been constructed for a number of years in every field of computational simulation. However, no comprehensive guidelines have been proposed for the construction and use of V&V benchmarks. For example, the field of nuclear reactor safety has not focused on code verification benchmarks, but it has placed great emphasis on developing validation benchmarks. Many of these validation benchmarks are closely related to the operations of actual reactors at near-safety-critical conditions, as opposed to being more fundamental-physics benchmarks. This paper presents recommendations for the effective design and use of code verification benchmarks based on manufactured solutions, classical analytical solutions, and highly accurate numerical solutions. In addition, this paper presents recommendations for the design and use of validation benchmarks, highlighting the careful design of building-block experiments, the estimation of experimental measurement uncertainty for both inputs and outputs to the code, validation metrics, and the role of model calibration in validation. It is argued that the understanding of predictive capability of a computational model is built on the level of achievement in V&V activities, how closely related the V&V benchmarks are to the actual application of interest, and the quantification of uncertainties related to the application of interest.

  11. Radiography Facility - Building 239 Independent Validation Review

    SciTech Connect (OSTI)

    Altenbach, T J; Beaulieu, R A; Watson, J F; Wong, H J

    2010-02-02

    The purpose of this task was to perform an Independent Validation Review to evaluate the successful implementation and effectiveness of Safety Basis controls, including new and revised controls, to support the implementation of a new DSA/TSR for B239. This task addresses Milestone 2 of FY10 PEP 7.6.6. As the first IVR ever conducted on a LLNL nuclear facility, it was designated a pilot project. The review follows the outline developed for Milestone 1 of the PEP, which is based on the DOE Draft Guide for Performance of Independent Verification Review of Safety Basis Controls. A formal Safety Basis procedure will be developed later, based on the lessons learned with this pilot project. Note, this review is termed a ''Validation'' in order to be consistent with the PEP definition and address issues historically raised about verification mechanisms at LLNL. Validation is intended to confirm that implementing mechanisms realistically establish the ability of TSR LCO, administrative control or safety management program to accomplish its intended safety function and that the controls are being implemented. This effort should not, however, be confused with a compliance assessment against all relevant DOE requirements and national standards. Nor is it used as a vehicle to question the derivation of controls already approved by LSO unless a given TSR statement simply cannot be implemented as stated.

  12. Technology Validation Sig Gronich

    E-Print Network [OSTI]

    · Awarded Power Parks Project to Hawaiian Electric Company, Detroit Edison and Arizona Public Services, validate stationary fuel cell and hydrogen ICE systems that co- produce hydrogen and electricity from non-renewable and renewable resources, and demonstrate 30,000 hour durability, greater than 32% efficiency and a price of $1

  13. 9. Technology Validation Introduction

    E-Print Network [OSTI]

    system solution and that system performance and operation are met under anticipated operating scenarios & Infrastructure Analysis Keith Wipke, National Renewable Energy Laboratory (NREL) 9-6 4.00 3.75 3.75 3.75 3.50 3.60 3.40 3.38 Technology Validation: Fuel Cell Bus Evaluations Leslie Eudy, National Renewable Energy

  14. CIPS Validation Data Plan

    SciTech Connect (OSTI)

    Nam Dinh

    2012-03-01

    This report documents analysis, findings and recommendations resulted from a task 'CIPS Validation Data Plan (VDP)' formulated as an POR4 activity in the CASL VUQ Focus Area (FA), to develop a Validation Data Plan (VDP) for Crud-Induced Power Shift (CIPS) challenge problem, and provide guidance for the CIPS VDP implementation. The main reason and motivation for this task to be carried at this time in the VUQ FA is to bring together (i) knowledge of modern view and capability in VUQ, (ii) knowledge of physical processes that govern the CIPS, and (iii) knowledge of codes, models, and data available, used, potentially accessible, and/or being developed in CASL for CIPS prediction, to devise a practical VDP that effectively supports the CASL's mission in CIPS applications.

  15. 21.1 Introduction A sensor is a device that provides an electrical output responding to a stimulation of a nonelectrical

    E-Print Network [OSTI]

    Wilamowski, Bogdan Maciej

    21-1 21.1 Introduction A sensor is a device that provides an electrical output responding to a stimulation of a nonelectrical signal. It converts a physical parameter into a signal suitable for processing/28/2010 7:55:10 PM #12;21-2 Control and Mechatronics The time cost for the light traveling through

  16. Integrated performance validation facility for KNICS

    SciTech Connect (OSTI)

    Kim, D. G.; Choi, J. J.; Choi, M. J.; Choe, I. N. [I and C Engineering Dept., Korea Power Engineering Company, 360-9, Mabuk-Dong, Yongin-Si. Gyeonggi-Do. 446-713 (Korea, Republic of); Gong, Y. H.; Kim, K. H. [KNICS R and D Center, 28-1, Seongju-Dong, Changwon-Si. 641-120 (Korea, Republic of)

    2006-07-01

    For the application of new digital control and monitoring systems in nuclear power plants (NPPs), it is required to satisfy the proven technology requirements. They should have at least three years of documented, satisfactory service as modules of subsystems in power plant applications similar to that of NPP, or it should have three years of documented, satisfactory service in other plant applications which are similar to the use in NPP (EPRI-URD's first option). However, tlte digital control and monitoring systems developed by Korea Nuclear Instrumentation A Control System (KNICS) R and D Center, due to the nature of the firstly developed system, have had no prior application in any NPPs as well as industrial and fossil power plants. Therefore, well defined program using 'Integrated Performance Validation Facility (IPVF) 'for prototype testing has been prepared to verify their performance, operability and reliability according to EPRI-URD's second option: It has satisfactorily completed a defined program of prototype testing which has been designed to verify its performance. The IPVF for KNICS is being designed to justify that new control systems are proven to meet utility's requirements. The IPVF comprises Virtual Operating Crew (VOC) and Test Commander (TC). Human System Interface (HIS). Evaluation System, and Simulator and Interface System. PLC and DCS developed by KNICS are connected with IPVF. Control logics and HIS of real NPP are implemented in the KNICS PLC and DCS, which are the validation object. Finally. IPVF will be extremely valuable for other activities in addition to the validation of the new control system equipment, including the testing and evaluation of plant control algorithms, personnel training, and support for long-term maintenance of the control systems. (authors)

  17. Value of Laboratory Experiments for Code Validations

    SciTech Connect (OSTI)

    Wawersik, W.R.

    1998-12-14

    Numerical codes have become indispensable for designing underground structures and interpretating the behavior of geologic systems. Because of the complexities of geologic systems, however, code calculations often are associated with large quantitative uncertainties. This papers presents three examples to demonstrate the value of laboratory(or bench scale) experiments to evaluate the predictive capabilities of such codes with five major conclusions: Laboratory or bench-scale experiments are a very cost-effective, controlled means of evaluating and validating numerical codes, not instead of but before or at least concurrent with the implementation of in situ studies. The design of good laboratory validation tests must identifj what aspects of a code are to be scrutinized in order to optimize the size, geometry, boundary conditions, and duration of the experiments. The design of good and sometimes difficult numerical analyses and sensitivity studies. Laboratory validation tests must involve: Good validation experiments will generate independent data sets to identify the combined effect of constitutive models, model generalizations, material parameters, and numerical algorithms. Successfid validations of numerical codes mandate a close collaboration between experimentalists and analysts drawing from the full gamut of observations, measurements, and mathematical results.

  18. Tryptophan depletion promotes habitual over goal-directed control of appetitive responding in humans

    E-Print Network [OSTI]

    Worbe, Yulia; Savulich, George; de Wit, Sanne; Fernandez-Egea, Emilio; Robbins, Trevor W.

    2015-02-06

    -directed and habitual action. Neuropsychopharmacology 35:48–69. Bayer J, Bandurski P, Sommer T (2013) Differential modulation ofvactivity related to the anticipation of monetary gains and losses across the menstrual cycle. European Journal of Neuroscience 38...

  19. Preventing and Responding to All Forms of Violence in the Workplace...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    P 444.1, Preventing and Responding to All Forms of Violence in the Workplace (Informational Purposes Only) by Beau Newman Functional areas: Workplace Violence, Employee Safety This...

  20. Optimal Control of Distillation Systems 

    E-Print Network [OSTI]

    Chatterjee, N.; Suchdeo, S. R.

    1984-01-01

    The optimum performance of a distillation system can be evaluated by examining the product purities, the product recoveries, and the system's capability to respond to small or large, expected or unexpected, plant disturbances. An optimal control...

  1. FIMS Data Validation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information Systems FIMS Data Validation FIMS Data Validation FIMS Data Validation The Facility Information Management System (FIMS) is the Department's official repository of...

  2. Red Algae Respond to Waves: Morphological and Mechanical Variation in Mastocarpus papillatus Along

    E-Print Network [OSTI]

    Denny, Mark

    Red Algae Respond to Waves: Morphological and Mechanical Variation in Mastocarpus papillatus Along Grove, California, 93950 Abstract. Intertidal algae are exposed to the potentially severe drag forces generated by crashing waves, and several species of brown algae respond, in part, by varying the strength

  3. Webinar March 24: National Hydrogen Safety Training Resource for Emergency Responders

    Broader source: Energy.gov [DOE]

    The Fuel Cell Technologies Office will present a live webinar titled "National Hydrogen Safety Training Resource for Emergency Responders" on Tuesday, March 24, from 12 to 1 p.m. Eastern Daylight Time. This webinar will describe a new, free, online national hydrogen safety training resource for emergency responders.

  4. Controlled Hydrogen Fleet and Infrastructure Demonstration and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Citation Details In-Document Search Title: Controlled Hydrogen Fleet and Infrastructure...

  5. Evaluating resilience of DNP3-controlled SCADA systems against event buffer flooding

    SciTech Connect (OSTI)

    Yan, Guanhua [Los Alamos National Laboratory; Nicol, David M [UNIV OF IL; Jin, Dong [UNIV OF IL

    2010-12-16

    The DNP3 protocol is widely used in SCADA systems (particularly electrical power) as a means of communicating observed sensor state information back to a control center. Typical architectures using DNP3 have a two level hierarchy, where a specialized data aggregator device receives observed state from devices within a local region, and the control center collects the aggregated state from the data aggregator. The DNP3 communication between control center and data aggregator is asynchronous with the DNP3 communication between data aggregator and relays; this leads to the possibility of completely filling a data aggregator's buffer of pending events, when a relay is compromised or spoofed and sends overly many (false) events to the data aggregator. This paper investigates how a real-world SCADA device responds to event buffer flooding. A Discrete-Time Markov Chain (DTMC) model is developed for understanding this. The DTMC model is validated by a Moebius simulation model and data collected on real SCADA testbed.

  6. Survey respondents were asked what information on the CDM website they--as CDM students --found most relevant. Out of 257 respondents, the top four response

    E-Print Network [OSTI]

    Miller, Craig

    CDM Survey Results Survey respondents were asked what information on the CDM website they-- as CDM Information, Degree Information, Faculty Information and Schedule. The category Course Information was mentioned 122 times. The category Course Information also included responses that mentioned the words "class

  7. Software Verification and Validation Procedure

    SciTech Connect (OSTI)

    Olund, Thomas S.

    2008-09-15

    This Software Verification and Validation procedure provides the action steps for the Tank Waste Information Network System (TWINS) testing process. The primary objective of the testing process is to provide assurance that the software functions as intended, and meets the requirements specified by the client. Verification and validation establish the primary basis for TWINS software product acceptance.

  8. Washington and Lee University Guidelines for Responding to Information Security Breaches

    E-Print Network [OSTI]

    Marsh, David

    Washington and Lee University Guidelines for Responding to Information Security Breaches Notifications 1. As further detailed in the university's Guidelines for Reporting Information Security Breaches regarding an actual or suspected data breach should contact: i. the university's Information Security

  9. More money, more science? : how the malaria research community responds to funding opportunities

    E-Print Network [OSTI]

    Krestin, Ruth Viviane

    2010-01-01

    Agencies that fund research shape both the rate and direction of scientific progress through the resource allocation choices they make. However, our understanding of the degree to which scientists respond to shifts in that ...

  10. Guide on Preventing and Responding to All Forms of Violence in the Workplace

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-04-22

    This guide is a broad overview of the basic tools for development of site specific procedures for responding to workplace violence. Supports implementation of DOE P 444.1. Does not cancel/supersede other directives.

  11. Look at this: the neural correlates of initiating and responding to bids for joint attention

    E-Print Network [OSTI]

    Redcay, Elizabeth

    When engaging in joint attention, one person directs another person's attention to an object (Initiating Joint Attention, IJA), and the second person's attention follows (Responding to Joint Attention, RJA). As such, joint ...

  12. The relationship of social desirability responding and the Big Five: an investigation using confirmatory factor analysis 

    E-Print Network [OSTI]

    Carlisle, Todd Dana

    2000-01-01

    The relationship between social desirability responding (SDR) and the Big Five factors of personality was both summarized with a review of past and current studies and directly investigated using a series of confirmatory ...

  13. Stress, performance, and control room operations

    SciTech Connect (OSTI)

    Fontaine, C.W.

    1990-01-01

    The notion of control room operator performance being detrimentally affected by stress has long been the focus of considerable conjecture. It is important to gain a better understanding of the validity of this concern for the development of effective severe-accident management approaches. This paper illustrates the undeniable negative impact of stress on a wide variety of tasks. A computer-controlled simulated work environment was designed in which both male and female operators were closely monitored during the course of the study for both stress level (using the excretion of the urine catecholamines epinephrine and norepinephrine as an index) and job performance. The experimental parameters employed by the study when coupled with the subsequent statistical analyses of the results allow one to make some rather striking comments with respect to how a given operator might respond to a situation that he or she perceives to be psychologically stressful (whether the stress be externally or internally generated). The findings of this study clearly indicated that stress does impact operator performance on tasks similar in nature to those conducted by control room operators and hence should be seriously considered in the development of severe-accident management strategies.

  14. first responders

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal GasAdministration Medal01 Sandia4) August 20123/%2A en46Afed feed families |fff |fire

  15. RESPONDENT INFORMATION

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming Dry Natural GasNaturalOctober 2015 Alcohol. TheData - U.S.fuel oil

  16. RESPONDENT INFORMATION

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming Dry Natural GasNaturalOctober 2015 Alcohol. TheData - U.S.fuel

  17. Advanced Supply System Validation Workshop

    Broader source: Energy.gov [DOE]

    The Bioenergy Technologies Office (BETO) is hosting the Advanced Supply System Validation Workshop on February 3-4, 2015, in Golden, Colorado. The purpose of the workshop is to bring together a...

  18. Building public trust: Actions to respond to the report of the Advisory Committee on human radiation experiments

    SciTech Connect (OSTI)

    NONE

    1997-03-01

    Democratic government requires trust: people need to know and believe that the government is telling the truth. Without information about what the government is doing and why, citizens cannot exercise democratic control over government institutions. During his first year in office, President Clinton became concerned about reports that the government had conducted unethical secret human radiation experiments during the Cold War. To address this issue, in January 1994, President Clinton established the Advisory Committee on Human Radiation Experiments (ACHRE), chaired by bioethicist Dr. Ruth Faden of Johns Hopkins University. The President also directed all Federal agencies to search for records related to human subjects radiation research and provide them to the Advisory Committee. This report presents the Administration`s actions to respond to the ACHRE`s findings and recommendations.

  19. Quality data validation: Comprehensive approach to environmental data validation

    SciTech Connect (OSTI)

    Matejka, L.A. Jr.

    1993-10-01

    Environmental data validation consists of an assessment of three major areas: analytical method validation; field procedures and documentation review; evaluation of the level of achievement of data quality objectives based in part on PARCC parameters analysis and expected applications of data. A program utilizing matrix association of required levels of validation effort and analytical levels versus applications of this environmental data was developed in conjunction with DOE-ID guidance documents to implement actions under the Federal Facilities Agreement and Consent Order in effect at the Idaho National Engineering Laboratory. This was an effort to bring consistent quality to the INEL-wide Environmental Restoration Program and database in an efficient and cost-effective manner. This program, documenting all phases of the review process, is described here.

  20. Technical Demonstration and Economic Validation of Geothermal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Economic Validation of Geothermal-Produced Electricity from Coproduced Water at Existing OilGas Wells in Texas Technical Demonstration and Economic Validation of...

  1. Overview of Hazard Assessment and Emergency Planning Software of Use to RN First Responders

    SciTech Connect (OSTI)

    Waller, E; Millage, K; Blakely, W F; Ross, J A; Mercier, J R; Sandgren, D J; Levine, I H; Dickerson, W E; Nemhauser, J B; Nasstrom, J S; Sugiyama, G; Homann, S; Buddemeier, B R; Curling, C A; Disraelly, D S

    2008-08-26

    There are numerous software tools available for field deployment, reach-back, training and planning use in the event of a radiological or nuclear (RN) terrorist event. Specialized software tools used by CBRNe responders can increase information available and the speed and accuracy of the response, thereby ensuring that radiation doses to responders, receivers, and the general public are kept as low as reasonably achievable. Software designed to provide health care providers with assistance in selecting appropriate countermeasures or therapeutic interventions in a timely fashion can improve the potential for positive patient outcome. This paper reviews various software applications of relevance to radiological and nuclear (RN) events that are currently in use by first responders, emergency planners, medical receivers, and criminal investigators.

  2. MICROFLUIDIC CONTROL OF STEM CELL DIFFUSIBLE SIGNALING

    E-Print Network [OSTI]

    Voldman, Joel

    MICROFLUIDIC CONTROL OF STEM CELL DIFFUSIBLE SIGNALING Katarina Blagovi, Lily Y. Kim, Alison M cell differentiation. KEYWORDS: Embryonic stem cells, microfluidic perfusion, diffusible signaling; they secrete molecules to which they respond. Microfluidics offers a potential solution to this challenge

  3. RESPONDING TO ALLEGATIONS OF SCIENTIFIC MISCONDUCT FOR US PUBLIC HEALTH SERVICE GRANT APPLICANTS AND RECIPIENTS

    E-Print Network [OSTI]

    Brownstone, Rob

    RESPONDING TO ALLEGATIONS OF SCIENTIFIC MISCONDUCT FOR US PUBLIC HEALTH SERVICE GRANT APPLICANTS University is committed to excellence in scholarly activities and as such is committed to assuring that the highest standards of scholarly integrity are to be understood and practised. Scholarly activity varies

  4. or executed, and not to others, while the remainder responded to

    E-Print Network [OSTI]

    Behrmann, Marlene

    characteristics in anterior intraparietal area PF/IPL. One of the studies [2] reported that a small number,3] reproduced the original finding in area F5, while the third [4] reported neurons with the same functional that a small number of mirror neurons in areas F5 and IPL responded selectively to a particular movement goal

  5. Guide on Preventing and Responding to All Forms of Violence in the Workplace

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-10-21

    To ensure all sites have the tools to implement processes, we have created this guide. Each site is expected to develop its own site specific set of procedures/process to implement DOE Policy 444.1 Preventing and Responding to all forms of violence in the Workplace.

  6. HumanWildlife Conflicts 2(2):194199, Fall 2008 How people should respond when

    E-Print Network [OSTI]

    by a black bear, mountain lion, or wolf, most respondents said to fight back. Opinion was divided over, carnivores, grizzly bear, human­wildlife conflicts, mountain lion, predator attacks, wolf Attacks by large). Black bears (Ursus americana), grizzly bears (Ursus arctos), mountain lions (Puma concolor), and gray

  7. "Our flexible and diverse program options respond to individual student needs." carleton.ca/socanth

    E-Print Network [OSTI]

    Dawson, Jeff W.

    "Our flexible and diverse program options respond to individual student needs." carleton and social conditions in diverse contexts throughout the world. We offer three program options: coursework work with their area of research interest, while gaining real- world experience. #12;This document

  8. Situational Judgment Test Responding: Best and Worst or Rate Each Response 

    E-Print Network [OSTI]

    Rasmussen, Jennifer

    2010-01-16

    because this type of SJT has a high cognitive load and thus acts like a knowledge test. It was also hypothesized that the SJT on which respondents rated the effectiveness of each option on a Likert scale would be related to personality because it taps...

  9. Responding to symptoms suggestive of lung cancer: a qualitative interview study

    E-Print Network [OSTI]

    Birt, Linda; Hall, Nicky; Emery, Jon; Banks, Jon; Mills, Katie; Johnson, Margaret; Hamilton, Willie; Walter, Fiona M.

    2014-12-11

    illness experiences. Help-seeking was triggered when: symptoms failed to respond as expected; there was an increased awareness of symptoms of lung cancer; the public nature of a cough meant others were able to endorse help-seeking. Almost half visited...

  10. Sensor Data Management, Validation, Correction,

    E-Print Network [OSTI]

    Wang, Xiaorui "Ray"

    in three areas Envelope Equipment System/building integration Develop component technologies that are more in real buildings #12;6 Envelope research lab facilities Heat Flow Through Roof/Attic Assemblies Heat FlowSensor Data Management, Validation, Correction, and Provenance for Building Technologies Charles

  11. Incrementally Deployable Source Address Validity

    E-Print Network [OSTI]

    Lowd, Daniel

    ID-SAVE: Incrementally Deployable Source Address Validity Enforcement Toby Ehrenkranz ://netsec.cs.uoregon.edu #12;Ehrenkranz WiP ID-SAVE What's The Problem? While routers know which direction a packet should are unreliable ID-SAVE attacks this root cause! 1 #12;Ehrenkranz WiP ID-SAVE ID-SAVE Basics Create and maintain

  12. Methodology for Validating Building Energy Analysis Simulations

    SciTech Connect (OSTI)

    Judkoff, R.; Wortman, D.; O'Doherty, B.; Burch, J.

    2008-04-01

    The objective of this report was to develop a validation methodology for building energy analysis simulations, collect high-quality, unambiguous empirical data for validation, and apply the validation methodology to the DOE-2.1, BLAST-2MRT, BLAST-3.0, DEROB-3, DEROB-4, and SUNCAT 2.4 computer programs. This report covers background information, literature survey, validation methodology, comparative studies, analytical verification, empirical validation, comparative evaluation of codes, and conclusions.

  13. Sector Course Name Duration 2014-2015 HST Total Marine Basic Oil Spill Response (Responder) 5 days $ 1,435.00 -$ 1,435.00$

    E-Print Network [OSTI]

    Oyet, Alwell

    Sector Course Name Duration 2014-2015 HST Total Marine Basic Oil Spill Response (Responder) 5 days Aid Emergency Medical Responder Bridging 4 days $ 775.00 100.

  14. Adaptation of hybrid five-phase ABS algorithms for experimental validation

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    -lock braking, Hybrid control systems, Limit cycle analysis, Experimental validation, Quarter-car. 1Adaptation of hybrid five-phase ABS algorithms for experimental validation Mathieu Gerard WilliamAnti-lock Braking System (ABS) is the most important active safety system for passenger cars, but unfortunately

  15. Responding to complexity in socio-economic systems: How to build a smart and resilient society?

    E-Print Network [OSTI]

    Helbing, Dirk

    2015-01-01

    The world is changing at an ever-increasing pace. And it has changed in a much more fundamental way than one would think, primarily because it has become more connected and interdependent than in our entire history. Every new product, every new invention can be combined with those that existed before, thereby creating an explosion of complexity: structural complexity, dynamic complexity, functional complexity, and algorithmic complexity. How to respond to this challenge? And what are the costs?

  16. A Pragmatic Standard of Legal Validity 

    E-Print Network [OSTI]

    Tyler, John

    2012-07-16

    American jurisprudence currently applies two incompatible validity standards to determine which laws are enforceable. The natural law tradition evaluates validity by an uncertain standard of divine law, and its methodology relies on contradictory...

  17. k-Validity vs Validity in Q: A formula of Q that is k-valid for all k, but not valid Branden Fitelson

    E-Print Network [OSTI]

    Fitelson, Branden

    k-Validity vs Validity in Q: A formula of Q that is k-valid for all k, but not valid Branden Fitelson 03/13/07 Consider the following three formulas of Q [where, as always, p q (p q), and p p]: p x A false on any k-element interpretation. And, since A is a closed formula, it must either be true or false

  18. CAMP PARKING PERMIT VALID LOT G ONLY

    E-Print Network [OSTI]

    Burg, Theresa

    PERMIT No. SUMMER CAMP PARKING PERMIT VALID LOT G ONLY (REFER TO SIGNS IN PARKING LOT TO ENSURE RD. Aperture Lake LOT F LOT FS LOT J LOT N LOT C University Day Care The Quad Summer Camp Parking Lot PROPER USE) VALID FROM: JUNE 29, 2015 TO: AUG 28, 2015 VALID ONLY DURING TIMES BELOW PARKING ANYWHERE

  19. Technology Validation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaics »Tankless WaterEnergyJanuary28-982This form is toValidation

  20. Benchmarks for GADRAS performance validation.

    SciTech Connect (OSTI)

    Mattingly, John K.; Mitchell, Dean James; Rhykerd, Charles L., Jr.

    2009-09-01

    The performance of the Gamma Detector Response and Analysis Software (GADRAS) was validated by comparing GADRAS model results to experimental measurements for a series of benchmark sources. Sources for the benchmark include a plutonium metal sphere, bare and shielded in polyethylene, plutonium oxide in cans, a highly enriched uranium sphere, bare and shielded in polyethylene, a depleted uranium shell and spheres, and a natural uranium sphere. The benchmark experimental data were previously acquired and consist of careful collection of background and calibration source spectra along with the source spectra. The calibration data were fit with GADRAS to determine response functions for the detector in each experiment. A one-dimensional model (pie chart) was constructed for each source based on the dimensions of the benchmark source. The GADRAS code made a forward calculation from each model to predict the radiation spectrum for the detector used in the benchmark experiment. The comparisons between the GADRAS calculation and the experimental measurements are excellent, validating that GADRAS can correctly predict the radiation spectra for these well-defined benchmark sources.

  1. Qualifying geospatial workflow models for adaptive controlled validity and accuracy

    E-Print Network [OSTI]

    Stock, Kristin

    with additional metadata associated with the chosen datasets and the chosen sub-models is essential to help quality and sensitivity. A meta- model integrating metadata measures compatible with current standards, not only is GEOSS expected to enable the sharing of data and sensors, but it will also facilitate

  2. ARROW (Version 2) Commercial Software Validation and Configuration Control

    SciTech Connect (OSTI)

    HEARD, F.J.

    2000-02-10

    ARROW (Version 2), a compressible flow piping network modeling and analysis computer program from Applied Flow Technology, was installed for use at the U.S. Department of Energy Hanford Site near Richland, Washington.

  3. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would like submit the followingConcentrating DepartmentOIRVI4136Contracts7019 UnlimitedProject

  4. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based Fuels|ProgramsLakeDepartment of Energy Contractor019Project

  5. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based Fuels|ProgramsLakeDepartment of Energy Contractor019ProjectProject |

  6. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based Fuels|ProgramsLakeDepartment of Energy

  7. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i p aDepartmentEnergy comparingDeep January 2012 PURPOSE ThisProject |

  8. A Simulation Learning Approach to Training First Responders for Radiological Emergencies ? A Continuation of Work

    SciTech Connect (OSTI)

    Lake, Joe E; Cross, Butch; Sanders, Robert Lon

    2008-01-01

    Real-time gaming engines, such as Epic Game's Unreal Engine[1], provide an excellent resource as a training environment. These engines provide an alternate reality that can accurately depict not only real world geometry, but they can also achieve realistic physical effects such as radiation fields and blast physics. The real time photorealistic graphics available through the Unreal Engine add to its applicability to this project's needs. Moreover, this engine provides a very efficient means to modify the game's physics modeling, visual effects, and game play structure to fit the ever-evolving needs of a training curriculum. To this end, we have worked to extend the Unreal Engine to incorporate radiation effects dependent on distance from a radiological source, similar to what one would experience in the real world. In order to help better prepare first responders for using the radiological detection equipment vital for mission success, we have continued work, previously described by Sanders and Rhodes [2], on a Geiger counter readout display being implemented and added to the interface's Heads Up Display (HUD) as well as incorporating a physically accurate model within the engine that will allow the first responder to acclimate themselves to the sounds and possible size of the device. Moreover, the Karma Physics Engine, which works in conjunction with the Unreal Engine 2, accurately simulates fluid physics, blast effects, and basic player movements. It is this physics engine that has been the focus of our continued efforts and has been extended to include realistic modeling of radiological effects.

  9. Learning environment simulator: a tool for local decision makers and first responders

    SciTech Connect (OSTI)

    Leclaire, Rene J [Los Alamos National Laboratory; Hirsch, Gary B [CLE, INCORPORATED

    2009-01-01

    The National Infrastructure Simulation and Analysis Center (NISAC) has developed a prototype learning environment simulator (LES) based on the Critical Infrastructure Protection Decision Support System (CIPDSS) infrastructure and scenario models. The LES is designed to engage decision makers at the grass-roots level (local/city/state) to deepen their understanding of an evolving crisis, enhance their intuition and allow them to test their own strategies for events before they occur. An initial version is being developed, centered on a pandemic influenza outbreak and has been successfully tested with a group of hospital administrators and first responders. LES is not a predictive tool but rather a simulated environment allowing the user to experience the complexities of a crisis before it happens. Users can contrast various approaches to the crisis, competing with alternative strategies of their own or other participants. LES is designed to assist decision makers in making informed choices by functionally representing relevant scenarios before they occur, including impacts to critical infrastructures with their interdependencies, and estimating human health & safety and economic impacts. In this paper a brief overview of the underlying models are given followed by a description of the LES, its interface and usage and an overview of the experience testing LES with a group of hospital administrators and first responders. The paper concludes with a brief discussion of the work remaining to make LES operational.

  10. Valuation of the use of biomarkers predictive of drug efficacy to enrich responders in oncology drug clinical development

    E-Print Network [OSTI]

    Wine, David

    2006-01-01

    I study several aspects of the value in performing oncology clinical trials using screening biomarkers to preferentially select and enroll responders. From trial reports and investigational reports on potential biomarkers, ...

  11. NEW - DOE G 444.1 1, Guide on Preventing and Responding to All Forms of Violence in the Workplace

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    This guide is a broad overview of the basic tools for a site to develop its site specific procedures for responding to workplace violence. Supports implementation of DOE P 444.1.

  12. CHANGES TO THE CDS FOR 2003-2004 A0. Respondent Information: This item collects respondent name and contact information in case questions arise.

    E-Print Network [OSTI]

    Selmic, Sandra

    to include only institutional aid. J. Degrees Conferred: CIP 2000's two-digit categories are now listed application site on the Internet? If so, please specify: A2. Source of institutional control (check one only of students for each of the following categories as of the institution's official fall reporting date

  13. Validation of expert systems with multiple experts 

    E-Print Network [OSTI]

    Mitri, Wajeeh Asad

    1991-01-01

    confused with verification. The verification process "refers to building the system right (that is, substantiating that a system correctly implements its specifications)" [3]. Although the validation of traditional software is a relatively well... Resident Engineers Fig. l. An example of a hierarchy of experts. 1. Validation Phase Verification and validation of expert systems are acknowledged by a number of refer- ences as part of the expert system building process. However, there is little...

  14. Transmission Services Product Pricing Validation - September...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission-Services-Product-Pricing-Validation---September-17,-2015 Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer...

  15. Reminder: Transmission Services Product Pricing Validation -...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission-Services-Product-Pricing-Validation---September-24,-2015 Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer...

  16. VALIDATION OF NOMINATIONS IN GAS NETWORK OPTIMIZATION ...

    E-Print Network [OSTI]

    2013-11-17

    in gas transportation, namely the validation of nomination problem: Given a ...... Mathematical Methods in Fluid Dynamics, volume 67 of Pitman Monographs.

  17. TEG On-Vehicle Performance & Model Validation

    Broader source: Energy.gov [DOE]

    Details efforts and results of steady-state and transient models validated with bench, engine dynamometer, and on-vehicle tests to measure actual performance

  18. Fuel Cell Backup Power Technology Validation (Presentation)

    SciTech Connect (OSTI)

    Kurtz, J.; Sprik, S.; Ramsden, T.; Saur, G.

    2012-10-01

    Presentation about fuel cell backup power technology validation activities at the U.S. Department of Energy's National Renewable Energy Laboratory.

  19. Probabilistic Methods for Model Validation 

    E-Print Network [OSTI]

    Halder, Abhishek

    2014-05-01

    Instead of Moments or Sets . . . . . 6 1.3.4 Methodology and Organization . . . . . . . . . . . . . . . . . 8 1.4 Contributions of This Dissertation . . . . . . . . . . . . . . . . . . . . 9 2. UNCERTAINTY PROPAGATION FOR DETERMINISTIC FLOW . . . . 12 2...’s Density Function Based Model Fal- sification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 113 4.6 Chapter Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114 xv 5. CASE STUDY: F-16 CONTROLLER ROBUSTNESS VERIFICATION...

  20. ISOTHERMAL AIR INGRESS VALIDATION EXPERIMENTS

    SciTech Connect (OSTI)

    Chang H Oh; Eung S Kim

    2011-09-01

    Idaho National Laboratory carried out air ingress experiments as part of validating computational fluid dynamics (CFD) calculations. An isothermal test loop was designed and set to understand the stratified-flow phenomenon, which is important as the initial air flow into the lower plenum of the very high temperature gas cooled reactor (VHTR) when a large break loss-of-coolant accident occurs. The unique flow characteristics were focused on the VHTR air-ingress accident, in particular, the flow visualization of the stratified flow in the inlet pipe to the vessel lower plenum of the General Atomic’s Gas Turbine-Modular Helium Reactor (GT-MHR). Brine and sucrose were used as heavy fluids, and water was used to represent a light fluid, which mimics a counter current flow due to the density difference between the stimulant fluids. The density ratios were changed between 0.87 and 0.98. This experiment clearly showed that a stratified flow between simulant fluids was established even for very small density differences. The CFD calculations were compared with experimental data. A grid sensitivity study on CFD models was also performed using the Richardson extrapolation and the grid convergence index method for the numerical accuracy of CFD calculations . As a result, the calculated current speed showed very good agreement with the experimental data, indicating that the current CFD methods are suitable for predicting density gradient stratified flow phenomena in the air-ingress accident.

  1. Developing validation strategies for the financial-reporting system. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-02-06

    This report is the result of an 8-month project performed for the Office of Energy Information Validation (OEIV) in the Department of Energy. Its primary purpose has been to develop alternative techniques for validating the Financial Reporting System (FRS). In order to accomplish this objective, several activities were performed. First, the data needs of prospective FRS users were related to the information available from the FRS to determine how well the FRS data meet users' needs. The two most common desired changes in the FRS among the users were: more segmented data and more geographic detail. Two additional desired changes were: clarification or alteration in definitions of such terms as domestic, operating income, and funds (as in sources and use of statement), and require ARAMCO to submit FRS data or require the participating members to make necessary reconciliations on their income statements. Next, several key validation issues pertinent to the meaningfulness and usefulness of FRS data were examined. This task dealt directly with the problem of using accounting data for economic analyses. Finally, specific guidelines for validating the flow of data from a respondent to the FRS data base were developed. Utilizing the framework within which OEIV must operate, and based on their legislative mandate, empirical techniques were outlined in detail for the accomplishment of verification auditing, consistency/reasonableness auditing, and field auditing.

  2. GridMat: Matlab Toolbox for GridLAB-D to Analyse Grid Impact and Validate Residential Microgrid Level

    E-Print Network [OSTI]

    Al Faruque, Mohammad Abdullah

    GridMat: Matlab Toolbox for GridLAB-D to Analyse Grid Impact and Validate Residential Microgrid.alfaruque, fahourai} @ uci.edu Abstract-- Residential microgrid has the capability to participate in the distribution level) advanced control algorithms need to be developed and validated for such residential microgrids

  3. 2006 ILDC/ILMC Validation of Operational LDS VALIDATION OF AN OPERATIONAL LIGHTNING DETECTION SYSTEM

    E-Print Network [OSTI]

    Haak, Hein

    lightning detection system. Since 1995 KNMI operates a SAFIR (Surveillance et Alerte Foudre par of the lightning data of the SAFIR system. Validation against other operational lightning detection systems2006 ILDC/ILMC Validation of Operational LDS VALIDATION OF AN OPERATIONAL LIGHTNING DETECTION

  4. Marcus Venzke: Automatic Validation of Web Services 1 Automatic Validation of Web Services

    E-Print Network [OSTI]

    Turau, Volker

    Marcus Venzke: Automatic Validation of Web Services 1 Automatic Validation of Web Services Marcus validation" for web services. It allows to check if occurring message flows conform to the interface's speci a system's dependability. 1 Introduction Web services allow interoperation of loosely coupled components

  5. Human Behavior Meets Building Intelligence: How Occupants Respond to “Open Window” Signals

    E-Print Network [OSTI]

    Ackerly, Katie; Brager, Gail

    2012-01-01

    the signal message and occupant behavior were by and largesystem is in moving occupant behavior towards design teamobjectives and occupant control behaviors related to comfort

  6. VEPP-2000 COLLIDER CONTROL SYSTEM* A.Senchenko1,#

    E-Print Network [OSTI]

    Kozak, Victor R.

    VEPP-2000 COLLIDER CONTROL SYSTEM* A.Senchenko1,# , D.Berkaev1,2 , O.Gorbatenko1 , A.Kasaev1 , I of interacting subsystems responding on different acceleration facility parts. Control system software is based presents architecture, implementation and functionality of hardware and software of the collider control

  7. Estimating uncertainty of inference for validation

    SciTech Connect (OSTI)

    Booker, Jane M [Los Alamos National Laboratory; Langenbrunner, James R [Los Alamos National Laboratory; Hemez, Francois M [Los Alamos National Laboratory; Ross, Timothy J [UNM

    2010-09-30

    We present a validation process based upon the concept that validation is an inference-making activity. This has always been true, but the association has not been as important before as it is now. Previously, theory had been confirmed by more data, and predictions were possible based on data. The process today is to infer from theory to code and from code to prediction, making the role of prediction somewhat automatic, and a machine function. Validation is defined as determining the degree to which a model and code is an accurate representation of experimental test data. Imbedded in validation is the intention to use the computer code to predict. To predict is to accept the conclusion that an observable final state will manifest; therefore, prediction is an inference whose goodness relies on the validity of the code. Quantifying the uncertainty of a prediction amounts to quantifying the uncertainty of validation, and this involves the characterization of uncertainties inherent in theory/models/codes and the corresponding data. An introduction to inference making and its associated uncertainty is provided as a foundation for the validation problem. A mathematical construction for estimating the uncertainty in the validation inference is then presented, including a possibility distribution constructed to represent the inference uncertainty for validation under uncertainty. The estimation of inference uncertainty for validation is illustrated using data and calculations from Inertial Confinement Fusion (ICF). The ICF measurements of neutron yield and ion temperature were obtained for direct-drive inertial fusion capsules at the Omega laser facility. The glass capsules, containing the fusion gas, were systematically selected with the intent of establishing a reproducible baseline of high-yield 10{sup 13}-10{sup 14} neutron output. The deuterium-tritium ratio in these experiments was varied to study its influence upon yield. This paper on validation inference is the first in a series of inference uncertainty estimations. While the methods demonstrated are primarily statistical, these do not preclude the use of nonprobabilistic methods for uncertainty characterization. The methods presented permit accurate determinations for validation and eventual prediction. It is a goal that these methods establish a standard against which best practice may evolve for determining degree of validation.

  8. Verification and Validation of Hybrid Systems

    E-Print Network [OSTI]

    Jin, Xiaoqing

    2013-01-01

    automatic light control subsystem of a smart home for seniorautomatic light control subsystem in a smart home for seniorautomatic light control subsystem of a smart home for senior

  9. Measures of agreement between computation and experiment:validation metrics.

    SciTech Connect (OSTI)

    Barone, Matthew Franklin; Oberkampf, William Louis

    2005-08-01

    With the increasing role of computational modeling in engineering design, performance estimation, and safety assessment, improved methods are needed for comparing computational results and experimental measurements. Traditional methods of graphically comparing computational and experimental results, though valuable, are essentially qualitative. Computable measures are needed that can quantitatively compare computational and experimental results over a range of input, or control, variables and sharpen assessment of computational accuracy. This type of measure has been recently referred to as a validation metric. We discuss various features that we believe should be incorporated in a validation metric and also features that should be excluded. We develop a new validation metric that is based on the statistical concept of confidence intervals. Using this fundamental concept, we construct two specific metrics: one that requires interpolation of experimental data and one that requires regression (curve fitting) of experimental data. We apply the metrics to three example problems: thermal decomposition of a polyurethane foam, a turbulent buoyant plume of helium, and compressibility effects on the growth rate of a turbulent free-shear layer. We discuss how the present metrics are easily interpretable for assessing computational model accuracy, as well as the impact of experimental measurement uncertainty on the accuracy assessment.

  10. Review and validation of exposure assessment methods 

    E-Print Network [OSTI]

    Shaw, Eduardo

    2001-01-01

    The purpose of this research is twofold, to standardize and to validate exposure assessment methods. First, the attempt is made to standardize the manner in which exposure assessment methods are developed. Literature on the subject is reviewed...

  11. Validating Computer-Designed Proteins for Vaccines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Validating Computer-Designed Proteins for Vaccines Print In the struggle to keep up with microbes whose rapid mutations outpace our ability to produce vaccines, the human race has...

  12. Advanced Supply System Validation Workshop Agenda

    Broader source: Energy.gov [DOE]

    List of Assumptions and Draft Workshop Agenda for the Advanced Supply System Validation Workshop, February 3-4, 2014, Golden, Colorado, from the U.S. Department of Energy's Bioenergy Technologies Office.

  13. Validation and Accreditation of Transient Stability Results

    E-Print Network [OSTI]

    Engineering Research Center Empowering Minds to Engineer the Future Electric Energy System #12;Validation at Urbana-Champaign 1406 W. Green St Urbana, IL 61801 Tel: 217-333-4463 Fax: 217-333-1162 Email: Overbye

  14. Tools for event generator tuning and validation

    E-Print Network [OSTI]

    Andy Buckley

    2008-09-26

    I describe the current status of MCnet tools for validating the performance of event generator simulations against data, and for tuning their phenomenological free parameters. For validation, the Rivet toolkit is now a mature and complete system, with a large library of prominent benchmark analyses. For tuning, the Professor system has recently completed its first tunes of Pythia 6, with substantial improvements on the existing default tune and potential to greatly aid the setup of new generators for LHC studies.

  15. Criticality Safety Validation of SCALE 6.1 with ENDF/B-VII.0 Libraries

    SciTech Connect (OSTI)

    Marshall, William BJ J [ORNL] [ORNL; Rearden, Bradley T [ORNL] [ORNL

    2012-01-01

    ANSI/ANS-8.1-1998;2007, Nuclear Criticality Safety in Operations with Fissionable Material Outside Reactors, and ANSI/ANS-8.24-2007, Validation of Neutron Transport Methods for Nuclear Criticality Safety Calculations, require validation of a computer code and the associated data through benchmark evaluations based on physical experiments. The performance of the code and data are validated by comparing the calculated and the benchmark results. A SCALE procedure has been established to generate a Verified, Archived Library of Inputs and Data (VALID). This procedure provides a framework for preparing, peer reviewing, and controlling models and data sets derived from benchmark definitions so that the models and data can be used with confidence. The procedure ensures that the models and data were correctly generated using appropriate references with documented checks and reviews. Configuration management is implemented to prevent inadvertent modification of the models and data or inclusion of models that have not been subjected to the rigorous review process. VALID entries for criticality safety are based on critical experiments documented in the International Handbook of Evaluated Criticality Safety Benchmark Experiments (IHECSBE). The findings of a criticality safety validation of SCALE 6.1 utilizing the benchmark models vetted in the VALID library at Oak Ridge National Laboratory are summarized here.

  16. Does the Giant Wood Spider Nephila pilipes Respond to Prey Variation by Altering Web or Silk Properties?

    E-Print Network [OSTI]

    Blackledge, Todd

    Does the Giant Wood Spider Nephila pilipes Respond to Prey Variation by Altering Web or Silk Chung-Hsing University, Taichung, Taiwan Introduction Historically, orb webs constructed by spiders to construct webs are easy to quantify (Eber- hard 1990; Craig 1992; Pasquet et al. 1994; Sandoval 1994

  17. Summary Pinus taeda L. stomata respond slowly to changes in irradiance. Because incident irradiance on a leaf varies

    E-Print Network [OSTI]

    Teskey, Robert O.

    Summary Pinus taeda L. stomata respond slowly to changes in irradiance. Because incident irradiance on a leaf varies constantly, the rate of change in stomatal conductance to fluc- tuating irradiance may have with very different irradiance patterns, assuming that rates of stomatal opening and closing were similar

  18. Complex cytokine responses to hepatitis B surface antigen and tetanus toxoid in responders, nonresponders and subjects naive to

    E-Print Network [OSTI]

    Alper, Chester A.

    Complex cytokine responses to hepatitis B surface antigen and tetanus toxoid in responders, nonresponders and subjects naive to hepatitis B surface antigen Charles E. Larsena, c , Jianhua Xua, e , Susan; accepted 23 February 2000 Abstract Some human subjects vaccinated with hepatitis B surface antigen (HBs

  19. August 1, 2012 Thank you for the opportunity to review and respond to the RTI Grants Program Consultation

    E-Print Network [OSTI]

    August 1, 2012 Thank you for the opportunity to review and respond to the RTI Grants Program the future direction of investments in support of the Research Tools and Instruments (RTI) Grants Program in available program funding, enabling researchers to continue to utilize the RTI grant to foster and enhance

  20. change. Similar (and statistically indistinguishable: x2 1:99; df 2; P 0:57) proportions of respondents thought

    E-Print Network [OSTI]

    Basset, Yves

    change. Similar (and statistically indistinguishable: x2 ¼ 1:99; df ¼ 2; P ¼ 0:57) proportions by respondents who had a smaller proportion of papers accepted without rejection (x2 ¼ 19:12; df ¼ 1; P , 0:001), and a greater proportion of papers submitted multiple times before publication (x2 ¼ 22:83; df ¼ 1; P , 0

  1. DRAFT - DOE G 444.1-1, Guide on Preventing and Responding to All Forms of Violence in the Workplace

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    To ensure all sites have the tools to implement processes, we have created this guide. Each site is expected to develop its own site specific set of procedures/process to implement DOE Policy 444.1 Preventing and Responding to all forms of violence in the Workplace.

  2. Combustion Control 

    E-Print Network [OSTI]

    Riccardi, R. C.

    1984-01-01

    American industry is responding to the challenges of high fuel prices, intense international competition, and a renewed emphasis on quality. To meet these demands, industry has looked at many opportunities--some have been cost effective, some...

  3. Responding to Terrorist Incidents in Your Community: Flammable-Liquid Fire Fighting Techniques for Municipal and Rural Firefighters

    SciTech Connect (OSTI)

    Denise Baclawski

    2010-03-08

    The University of Nevada, Reno Fire Science Academy (FSA) applied for grant funding to develop and deliver programs for municipal, rural, and volunteer firefighters. The FSA specializes in preparing responders for a variety of emergency events, including flammable liquid fires resulting from accidents, intentional acts, or natural disasters. Live fire training on full scale burnable props is the hallmark of FSA training, allowing responders to practice critical skills in a realistic, yet safe environment. Unfortunately, flammable liquid live fire training is often not accessible to municipal, rural, or volunteer firefighters due to limited department training budgets, even though most department personnel will be exposed to flammable liquid fire incidents during the course of their careers. In response to this training need, the FSA developed a course during the first year of the grant (Year One), Responding to Terrorist Incidents in Your Community: Flammable-Liquid Fire Fighting Techniques for Municipal and Rural Firefighters. During the three years of the grant, a total of 2,029 emergency responders received this training. In Year Three, two new courses, a train-the-trainer for Responding to Terrorist Incidents in Your Community and Management of Large-Scale Disasters for Public Officials were developed and pilot tested during the Real-World Disaster Management Conference held at the FSA in June of 2007. Two research projects were conducted during Years Two and Three. The first, conducted over a two year period, evaluated student surveys regarding the value of the flammable liquids training received. The second was a needs assessment conducted for rural Nevada. Both projects provided important feedback and a basis for curricula development and improvements.

  4. V-193: Barracuda SSL VPN Input Validation Hole Permits Cross...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Validation Flaw Permits Cross-Site Scripting Attacks T-701: Citrix Access Gateway Enterprise Edition Input Validation Flaw in Logon Portal Permits Cross-Site Scripting Attacks...

  5. V-153: Symantec Brightmail Gateway Input Validation Flaw Permits...

    Broader source: Energy.gov (indexed) [DOE]

    T-701: Citrix Access Gateway Enterprise Edition Input Validation Flaw in Logon Portal Permits Cross-Site Scripting Attacks U-001:Symantec IM Manager Input Validation Flaws...

  6. Validation of techniques to mitigate copper surface contamination...

    Office of Scientific and Technical Information (OSTI)

    Validation of techniques to mitigate copper surface contamination in CUORE Citation Details In-Document Search Title: Validation of techniques to mitigate copper surface...

  7. Cloud Computing and Validation of Expandable In Silico Livers

    E-Print Network [OSTI]

    Ropella, Glen EP; Hunt, C Anthony

    2010-01-01

    benefit analysis of cloud computing versus desktop grids.as: Ropella and Hunt: Cloud computing and validation ofCloud computing and validation of expandable in silico

  8. Fact Sheet: Energy Storage Testing and Validation (October 2012...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Testing and Validation (October 2012) Fact Sheet: Energy Storage Testing and Validation (October 2012) At Sandia National Laboratories, the Energy Storage Analysis Laboratory, in...

  9. Testing and Validation of Vehicle to Grid Communication Standards...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Validation of Vehicle to Grid Communication Standards Testing and Validation of Vehicle to Grid Communication Standards 2011 DOE Hydrogen and Fuel Cells Program, and Vehicle...

  10. U-252: Barracuda Web Filter Input Validation Flaws Permit Cross...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks U-252: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks September...

  11. Validation of Hydrogen Exchange Methodology on Molecular Sieves...

    Office of Environmental Management (EM)

    Validation of Hydrogen Exchange Methodology on Molecular Sieves for Tritium Removal from Contaminated Water Validation of Hydrogen Exchange Methodology on Molecular Sieves for...

  12. Design, Modeling, and Validation of a Flame Reformer for LNT...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Design, Modeling, and Validation of a Flame Reformer for LNT External Bypass Regeneration Design, Modeling, and Validation of a Flame Reformer for LNT External Bypass Regeneration...

  13. PV Performance and Reliability Validation Capabilities at Sandia...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PV Performance and Reliability Validation Capabilities at Sandia National Laboratories PV Performance and Reliability Validation Capabilities at Sandia National Laboratories This...

  14. Model Predictive Control for Energy Efficient Buildings

    E-Print Network [OSTI]

    Ma, Yudong

    2012-01-01

    components that use energy, and thermal energy load. When aLearning Control for Thermal Energy Storage Systems”. In:to validate the energy savings and thermal comfort. Also the

  15. MODELING AND VALIDATION OF A HIGH SPEED ROTARY PWM ON/OFF VALVE Haink C. Tu

    E-Print Network [OSTI]

    Li, Perry Y.

    MODELING AND VALIDATION OF A HIGH SPEED ROTARY PWM ON/OFF VALVE Haink C. Tu Center for Compact-speed on/off valves are a critical technology for enabling digital control of hydraulic systems via pulse-width- modulation (PWM). High-speed valves, when used in virtually variable displacement pumps (VVDP), increase

  16. The Dartmouth Database of Children's Faces: Acquisition and Validation of a New Face Stimulus Set

    E-Print Network [OSTI]

    Duchaine, Bradley C.

    The Dartmouth Database of Children's Faces: Acquisition and Validation of a New Face Stimulus Set research. Although several extensive and well-controlled databases of adult faces exist, few databases include children's faces. Here we present the Dartmouth Database of Children's Faces, a set of photographs

  17. Criticality Code Validation Exercises with TSUNAMI

    SciTech Connect (OSTI)

    Rearden, Bradley T [ORNL

    2007-01-01

    In the criticality code validation of common systems, many paths may exist to a correct bias, bias uncertainty, and upper subcritical limit. The challenge for the criticality analyst is to select an efficient, defensible, and safe methodology to consistently obtain the correct values. One method of testing criticality code validation techniques is to use a sample system with a known bias as a test application and determine whether the methods employed can reproduce the known bias. In this paper, a low-enriched uranium (LEU) lattice critical experiment with a known bias is used as the test application, and numerous other LEU experiments are used as the benchmarks for the criticality code validation exercises using traditional and advanced parametric techniques. The parameters explored are enrichment, energy of average lethargy causing fission (EALF), and the TSUNAMI integral index ck with experiments with varying degrees of similarity. This paper is an extension of a previously published summary.

  18. Data Validation Using Data Descriptors Data validation is often defined by six data descriptors

    E-Print Network [OSTI]

    APPENDIX N Data Validation Using Data Descriptors Data validation is often defined by six data descriptors: 1) reports to decision maker 2) documentation 3) data sources 4) analytical method and detection limit 5) data review 6) data quality indicators The decision maker or reviewer examines the data

  19. Industrial validation models 1 4/23/03 Experimental validation of new software technology

    E-Print Network [OSTI]

    Zelkowitz, Marvin V.

    Industrial validation models 1 4/23/03 Experimental validation of new software technology Marvin V When to apply a new technology in an organization is a critical decision for every software development organization. Earlier work defines a set of methods that the research community uses when a new technology

  20. Marketing Plan for Demonstration and Validation Assets

    SciTech Connect (OSTI)

    2008-05-30

    The National Security Preparedness Project (NSPP), is to be sustained by various programs, including technology demonstration and evaluation (DEMVAL). This project assists companies in developing technologies under the National Security Technology Incubator program (NSTI) through demonstration and validation of technologies applicable to national security created by incubators and other sources. The NSPP also will support the creation of an integrated demonstration and validation environment. This report documents the DEMVAL marketing and visibility plan, which will focus on collecting information about, and expanding the visibility of, DEMVAL assets serving businesses with national security technology applications in southern New Mexico.

  1. Validating Computer-Designed Proteins for Vaccines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking WithTelecentric viewingValidating extended MHD models forValidating

  2. Validating Computer-Designed Proteins for Vaccines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking WithTelecentric viewingValidating extended MHD modelsValidating

  3. Binge or Control? Binge or Control? Assessment of the validity, treatment and underlying mechanisms

    E-Print Network [OSTI]

    van den Brink, Jeroen

    with anorexia nervosa (AN) and bulimia nervosa (BN). BED is characterized by recurrent episodes of binge eating

  4. King has no clothes: The role of the military in responding to a terrorist chemical/biological attack. Final report

    SciTech Connect (OSTI)

    Osterman, J.L.

    1996-06-14

    The United States has begun a program of counterproliferation in order to preempt the use of WMD by such elements, however, the ability to respond to the terrorist employment of biological/chemical weapons is absent. Given the structure, capability and technical expertise in the Federal Emergency Management Agency (FEMA) and the Federal Bureau of Investigation (FBI), the Department of Defense (DoD) will be tasked to conduct the response to such an incident. The geographical Commander in Chief (CINC) and the appointed Joint Task Force (JTF) commander will ultimately be assigned the response mission. Planning, training and coordination is required to develop a force capable of responding in a timely and coordinated manner.

  5. Command and Control during Security Incidents/Emergencies

    SciTech Connect (OSTI)

    Knipper, W. [NSTec

    2013-10-16

    This presentation builds on our response to events that pose, or have the potential to pose, a serious security or law enforcement risk and must be responded to and controlled in a clear a decisive fashion. We will examine some common concepts in the command and control of security-centric events.

  6. Model Based Test Generation for Microprocessor Architecture Validation

    E-Print Network [OSTI]

    Minnesota, University of

    , Minneapolis, MN 55455 CESCA, Virginia Tech, Blacksburg, VA 24061 Validation Technology, Intel Corporation

  7. Validating a token coherence protocol for scientific Fernandez-Pascual

    E-Print Network [OSTI]

    Acacio, Manuel

    Validating a token coherence protocol for scientific workloads Ricardo Fern´andez-Pascual r.fernandez

  8. Identifying evolving multivariate dynamics in individual and cohort time series, with application to physiological control systems

    E-Print Network [OSTI]

    Nemati, Shamim, 1980-

    2013-01-01

    Physiological control systems involve multiple interacting variables operating in feedback loops that enhance an organism's ability to self-regulate and respond to internal and external disturbances. The resulting multivariate ...

  9. Recognizing epigenetic patterns that mark the control of cell state in differentiation and disease

    E-Print Network [OSTI]

    Ng, Christopher W

    2015-01-01

    Unlike the genomic sequence, the epigenome is dynamic, responding to and influencing the cellular state. Understanding the ways in which chromatin structure exercises control over transcriptional programs during development ...

  10. FIRE Physics Validation Review Hampton Inn

    E-Print Network [OSTI]

    FIRE Physics Validation Review Agenda Hampton Inn 20260 Goldenrod Lane Germantown, Maryland, US Introduction John Willis 2:15 pm FIRE Overview Dale Meade 3:30 pm FIRE Physics Basis Charles Kessel 5:00 pm Diagnostics for FIRE, Challenges for FIRE and ITER Ken Young 5:30 pm FIRE Engineering Summary Phil

  11. Sequence Assembly Validation by Restriction Digest Fingerprint

    E-Print Network [OSTI]

    Rouchka, Eric

    Sequence Assembly Validation by Restriction Digest Fingerprint Comparison Eric C. Rouchka and David examines the use of restriction digest analysis as a method for testing the fidelity of sequence assembly. Restriction digest fingerprint matching is an established technology for high resolution physical map

  12. Feature extraction for structural dynamics model validation

    SciTech Connect (OSTI)

    Hemez, Francois [Los Alamos National Laboratory; Farrar, Charles [Los Alamos National Laboratory; Park, Gyuhae [Los Alamos National Laboratory; Nishio, Mayuko [UNIV OF TOKYO; Worden, Keith [UNIV OF SHEFFIELD; Takeda, Nobuo [UNIV OF TOKYO

    2010-11-08

    This study focuses on defining and comparing response features that can be used for structural dynamics model validation studies. Features extracted from dynamic responses obtained analytically or experimentally, such as basic signal statistics, frequency spectra, and estimated time-series models, can be used to compare characteristics of structural system dynamics. By comparing those response features extracted from experimental data and numerical outputs, validation and uncertainty quantification of numerical model containing uncertain parameters can be realized. In this study, the applicability of some response features to model validation is first discussed using measured data from a simple test-bed structure and the associated numerical simulations of these experiments. issues that must be considered were sensitivity, dimensionality, type of response, and presence or absence of measurement noise in the response. Furthermore, we illustrate a comparison method of multivariate feature vectors for statistical model validation. Results show that the outlier detection technique using the Mahalanobis distance metric can be used as an effective and quantifiable technique for selecting appropriate model parameters. However, in this process, one must not only consider the sensitivity of the features being used, but also correlation of the parameters being compared.

  13. REMSView Validation Application- Version 3.1

    Broader source: Energy.gov [DOE]

    The REMSView 3.1 Validation Application has been updated as of 3/9/2010. The application is a Java application and can be run on any computer system that can run Java. The interface is a standard windows format.

  14. RELAP-7 SOFTWARE VERIFICATION AND VALIDATION PLAN

    SciTech Connect (OSTI)

    Smith, Curtis L; Choi, Yong-Joon; Zou, Ling

    2014-09-01

    This INL plan comprehensively describes the software for RELAP-7 and documents the software, interface, and software design requirements for the application. The plan also describes the testing-based software verification and validation (SV&V) process—a set of specially designed software models used to test RELAP-7.

  15. Maui Electrical System Simulation Model Validation

    E-Print Network [OSTI]

    Maui Electrical System Simulation Model Validation Prepared for the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Under Award No. DE-FC-06NT42847 Task 9 Deliverable was prepared by General Electric Company (GE) as an account of work sponsored by the Hawaii Natural Energy

  16. Experimental Validation of a Risk Assessment Method

    E-Print Network [OSTI]

    Wieringa, Roel

    Experimental Validation of a Risk Assessment Method Eelco Vriezekolk1,3(B) , Sandro Etalle2, that is, that methods can be repeated with the same results. Risk assessments methods, however, often have. [Question/problem] Our goal is to assess the reliability of an availability risk assessment method

  17. Distributed Energy System Validation, Commissioning and

    E-Print Network [OSTI]

    Distributed Energy System Validation, Commissioning and Qualification Test Report Prepared Agreement No. DE-FC26-06NT42847 Hawai`i Distributed Energy Resource Technologies for Energy Security Subtask for the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Under Cooperative

  18. Master Thesis Validation of Interpersonal Stances

    E-Print Network [OSTI]

    Vellekoop, Michel

    , people recognized the stances expressed by the virtual humans when they show the behaviors technology, such as 3D animation, programming in 3D game engine and virtual reality head-mounted displayMaster Thesis Validation of Interpersonal Stances Expressed by Virtual Suspect Characters

  19. J.M. Butler Validation Webinar August 26, 2008 http://www.cstl.nist.gov/biotech/strbase/validation.htm 1

    E-Print Network [OSTI]

    J.M. Butler ­Validation Webinar August 26, 2008 http://www.cstl.nist.gov/biotech.butler@nist.gov 301-975-4049 http://www.cstl.nist.gov/biotech/strbase/validation.htm Webinar August 26, 2008 NIST ­Validation Webinar August 26, 2008 http://www.cstl.nist.gov/biotech/strbase/validation.htm 2 What

  20. Shot noise of charge current in a quantum dot responded by rotating and oscillating magnetic fields

    SciTech Connect (OSTI)

    Zhao, Hong-Kang Zou, Wei-Ke; Chen, Qiao

    2014-09-07

    We have investigated the shot noise and Fano factor of the dynamic spin-polarized quantum dot under the perturbations of a rotating magnetic field (RMF), and an oscillating magnetic field (OMF) by employing the non-equilibrium Green's function approach. The shot noise is enhanced from sub-Poissonian to super-Poissonian due to the application of RMF and OMF, and it is controlled sensitively by the tilt angle ? of RMF. The magnitude of shot noise increases as the photon energy ?? of OMF increases, and its valley eventually is reversed to peaks as the photon energy is large enough. Double-peak structure of Fano factor is exhibited as the frequency of OMF increases to cover a large regime. The Zeeman energy ?{sub 0}B{sub 0} acts as an effective gate bias to exhibit resonant behavior, and novel peak emerges associated with the applied OMF.

  1. Development and testing of an integrated signal validation system for nuclear power plants

    SciTech Connect (OSTI)

    Upadhyaya, B.R.; Kerlin, T.W.; Gaudio, P.J. Jr.

    1989-09-01

    Since the incident at Three Mile Island unit 2, computerized plant status display, implementation of human factors in control room design, and plant monitoring based on expert system technology have seen a tremendous growth. One such proposed operator assist device is a plant signal validation system. This system is used to check the consistency of redundant measurements (sensors) of selected process variables, estimate their expect values from plant-wide data, and detect, isolate and characterize the type of anomaly in the instrument channel outputs. In large process control systems signals from several hundred instrument channels are routed via data highways to control systems, protection (safety) systems and plant monitoring systems. The need of automated signal validation is necessary because of the large amount of information available, and as a result the operator's inability to validate information from many diverse sources. This is also useful for improved plant control (minimize challenges on control systems), minimizing plant downtime, and for predictive maintenance advising. 107 refs., 56 figs., 6 tabs.

  2. Force-controlled absorption in a fully-nonlinear numerical wave tank

    SciTech Connect (OSTI)

    Spinneken, Johannes Christou, Marios; Swan, Chris

    2014-09-01

    An active control methodology for the absorption of water waves in a numerical wave tank is introduced. This methodology is based upon a force-feedback technique which has previously been shown to be very effective in physical wave tanks. Unlike other methods, an a-priori knowledge of the wave conditions in the tank is not required; the absorption controller being designed to automatically respond to a wide range of wave conditions. In comparison to numerical sponge layers, effective wave absorption is achieved on the boundary, thereby minimising the spatial extent of the numerical wave tank. In contrast to the imposition of radiation conditions, the scheme is inherently capable of absorbing irregular waves. Most importantly, simultaneous generation and absorption can be achieved. This is an important advance when considering inclusion of reflective bodies within the numerical wave tank. In designing the absorption controller, an infinite impulse response filter is adopted, thereby eliminating the problem of non-causality in the controller optimisation. Two alternative controllers are considered, both implemented in a fully-nonlinear wave tank based on a multiple-flux boundary element scheme. To simplify the problem under consideration, the present analysis is limited to water waves propagating in a two-dimensional domain. The paper presents an extensive numerical validation which demonstrates the success of the method for a wide range of wave conditions including regular, focused and random waves. The numerical investigation also highlights some of the limitations of the method, particularly in simultaneously generating and absorbing large amplitude or highly-nonlinear waves. The findings of the present numerical study are directly applicable to related fields where optimum absorption is sought; these include physical wavemaking, wave power absorption and a wide range of numerical wave tank schemes.

  3. Control of Nuclear Weapon Data

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-07-21

    The directive establishes the policy, process and procedures for control of nuclear weapon data to ensure that dissemination of the information is restricted to individuals with appropriate clearances, approved authorization and valid need-to-know in keeping with the Atomic Energy Act (as amended) stipulation of ensuring common defense and security. Supersedes DOE O 5610.2.

  4. Task 3 - RMC method validation project report

    SciTech Connect (OSTI)

    Sarkinen, R.A.

    1996-08-01

    The EPRI Substation Reliability Centered Maintenance Project Task 3 uses utility data to validate the RCM process for maintenance in substations. At BPA, this project was used to validate the RCM method for a preventive maintenance program for substations. This project was performed by an RCM technical team and all maintenance personnel at the Chemawa Maintenance District Headquarters. The system chosen for, this project involved four transmission lines that feeds 230 kV Santiam Substation. This report explains the process for the system approach-used for the Santiam project and a summary of the results. The current preventive maintenance program is primarily based on time. The RCM approach for a preventive maintenance program realized significant savings.

  5. NASA Remote Sensing Validation Data: Saudi Arabia

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Myers, Daryl R. [NREL; Al-Abbadi, Naif [King Abdulaziz City for Science and Technology, Energy Research Institite; Wilcox, Steve [NREL

    Since 1995, the King Abdulaziz City for Science and Technology (KACST) and the National Renewable Energy Laboratory (NREL) have co-operated to establish a 12 station network of high quality solar radiation monitoring installations across the Kingdom of Saudi Arabia. NREL and KACST realized the value of accurate surface solar radiation flux measurements for validation of satellite derived surface and atmospheric solar radiation flux measurements, and is making this data available to support validation of satellite data products related to the NASA Mission to Planet Earth component of the Earth Science Enterprise Earth Observing System (EOS) project to evaluate long term climate trends based on measuements from EOS Terra Platforms. A CIMEL 8 channel sunphotometer for measuring aerosol optical depth at 6 wavelengths and total column water has been deployed at the Solar Village station since February 24, 1999. [Taken from http://rredc.nrel.gov/solar/new_data/Saudi_Arabia/

  6. Security Technology Demonstration and Validation Sustainability Plan

    SciTech Connect (OSTI)

    2008-08-31

    This report describes the process of creating continuity and sustainability for demonstration and validation (DEMVAL) assets at the National Security Technology Incubator (NSTI). The DEMVAL asset program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). The mission of the NSTI program is to identify, incubate, and accelerate technologies with national security applications at various stages of development by providing hands-on mentoring and business assistance to small businesses and emerging or growing companies. Part of this support is envisioned to be research and development of companies’ technology initiatives, at the same time providing robust test and evaluation of actual development activities. This program assists companies in developing technologies under the NSTI program through demonstration and validation of technologies applicable to national security created by incubators and other sources. The NSPP also will support the creation of an integrated demonstration and validation environment. Development of the commercial potential for national security technologies is a significant NSTI focus. As part of the process of commercialization, a comprehensive DEMVAL program has been recognized as an essential part of the overall incubator mission. A number of resources have been integrated into the NSTI program to support such a DEMVAL program.

  7. Nuclear data to support computer code validation

    SciTech Connect (OSTI)

    Fisher, S.E.; Broadhead, B.L.; DeHart, M.D.; Primm, R.T. III

    1997-04-01

    The rate of plutonium disposition will be a key parameter in determining the degree of success of the Fissile Materials Disposition Program. Estimates of the disposition rate are dependent on neutronics calculations. To ensure that these calculations are accurate, the codes and data should be validated against applicable experimental measurements. Further, before mixed-oxide (MOX) fuel can be fabricated and loaded into a reactor, the fuel vendors, fabricators, fuel transporters, reactor owners and operators, regulatory authorities, and the Department of Energy (DOE) must accept the validity of design calculations. This report presents sources of neutronics measurements that have potential application for validating reactor physics (predicting the power distribution in the reactor core), predicting the spent fuel isotopic content, predicting the decay heat generation rate, certifying criticality safety of fuel cycle facilities, and ensuring adequate radiation protection at the fuel cycle facilities and the reactor. The U.S. in-reactor experience with MOX fuel is first presented, followed by information related to other aspects of the MOX fuel performance information that is valuable to this program, but the data base remains largely proprietary. Thus, this information is not reported here. It is expected that the selected consortium will make the necessary arrangements to procure or have access to the requisite information.

  8. Solar Energy Research Institute Validation Test House Site Handbook

    SciTech Connect (OSTI)

    Burch, J.; Wortman, D.; Judkoff, R.; Hunn, B.

    1985-05-01

    The Validation Test House at the Solar Energy Research Institute in Golden, Colorado, is being used to collect performance data for analysis/design tool validation as part of the DOE Passive Solar Class A Performance Evaluation Program.

  9. Development and Validation of the Transition Coordinators Survey

    E-Print Network [OSTI]

    Bjorkman Wade, Diana K.

    2014-05-31

    The purpose of this study was to create a valid and reliable instrument for the field of secondary special education and transition by developing and validating the Transition Coordinators Survey (TCS). Transition coordinators ...

  10. Validation of machine-oriented strategies in chess endgames 

    E-Print Network [OSTI]

    Niblett, Timothy B.

    1982-01-01

    This thesis is concerned with the validation of chess endgame strategies. It is also concerned with the synthesis of strategies that can be validated. A strategy for a given player is the specification of the move to ...

  11. Protection of Use Control Vulnerabilities and Designs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-05-14

    The order establishes the policy, process and procedures for control of sensitive use control information in nuclear weapon data (NWD) categories Sigma 14 and Sigma 15 to ensure that dissemination of the information must be restricted to individuals with valid need to know. Supersedes DOE M 452.4-1A

  12. Industrial engineering study of tank farm access qualifications and validations

    SciTech Connect (OSTI)

    Sterling, S.G., Westinghouse Hanford

    1996-07-01

    Engineering study of alternatives to reduce costs of validation worker`s qualification prior to Tank Farm area access.

  13. Verification and Validation of Hybrid Systems

    E-Print Network [OSTI]

    Jin, Xiaoqing

    2013-01-01

    ECA rules for a smart home . . . . . . . . . . 2.3 Modelingphase for the smart home example. . . . . . . . .automatic light control subsystem of a smart home for senior

  14. Validation of the strain index in manufacturing facilities 

    E-Print Network [OSTI]

    Rucker, Nathan Paul

    1999-01-01

    factors were not found to be significant and had low measures of predictive validity. The results generated by this study suggest that the predictive validity of the Strain Index is good and the predictive validity of the generic poor. This indicates...

  15. INTELLIGENT SENSOR VALIDATION AND SENSOR FUSION FOR RELIABILITY AND SAFETY

    E-Print Network [OSTI]

    Agogino, Alice M.

    1 INTELLIGENT SENSOR VALIDATION AND SENSOR FUSION FOR RELIABILITY AND SAFETY ENHANCEMENT IN VEHICLE #12;2 Intelligent Sensor Validation and Sensor Fusion for Reliability and Safety Enhancement acknowledge the help of PATH engineers Pete Devlin, Seibum Choi, and Leon Chen. II. Keywords Sensor Validation

  16. Transient Mixed Convection Validation for NGNP

    SciTech Connect (OSTI)

    Smith, Barton; Schultz, Richard

    2015-10-19

    The results of this project are best described by the papers and dissertations that resulted from the work. They are included in their entirety in this document. They are: (1) Jeff Harris PhD dissertation (focused mainly on forced convection); (2) Blake Lance PhD dissertation (focused mainly on mixed and transient convection). This dissertation is in multi-paper format and includes the article currently submitted and one to be submitted shortly; and, (3) JFE paper on CFD Validation Benchmark for Forced Convection.

  17. ARM - Field Campaign - AIRS Validation Sonde Support

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach HomeA Better Anode Design to Improve4AJ01) (See22, 2012 [DataJulyMarch 27,5govCampaignsAIRS Validation

  18. Validating Computer-Designed Proteins for Vaccines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking WithTelecentric viewingValidating extended MHD models for

  19. Validating Computer-Designed Proteins for Vaccines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking WithTelecentric viewingValidating extended MHD models

  20. Ice Sheets: Byrd Polar Outreach & Education February 2013 You might remember I mentioned taking Wilderness First Responder (WFR) training in the

    E-Print Network [OSTI]

    Howat, Ian M.

    mentioned taking Wilderness First Responder (WFR) training in the December newsletter and found I carry a well-stocked first-aid kit in my car, the car we were driving in did not have such a kit

  1. Policy on Content Validation for CME Activities

    E-Print Network [OSTI]

    Dorf, Martin E.

    medical education (CME) activities is free from the control of commercial interests and is balanced be developed free from the control of commercial interests (see HMS Policy and Procedures: Identification trade names, where available trade names from several companies should be used, not just trade names

  2. VALIDATION OF ANALYTICAL METHODS AND INSTRUMENTATION FOR BERYLLIUM MEASUREMENT: REVIEW AND SUMMARY OF AVAILABLE GUIDES, PROCEDURES, AND PROTOCOLS

    SciTech Connect (OSTI)

    Ekechukwu, A.

    2008-12-17

    This document proposes to provide a listing of available sources which can be used to validate analytical methods and/or instrumentation for beryllium determination. A literature review was conducted of available standard methods and publications used for method validation and/or quality control. A comprehensive listing of the articles, papers, and books reviewed is given in Appendix 1. Available validation documents and guides are listed in the appendix; each has a brief description of application and use. In the referenced sources, there are varying approaches to validation and varying descriptions of validation at different stages in method development. This discussion focuses on validation and verification of fully developed methods and instrumentation that have been offered up for use or approval by other laboratories or official consensus bodies such as ASTM International, the International Standards Organization (ISO) and the Association of Official Analytical Chemists (AOAC). This review was conducted as part of a collaborative effort to investigate and improve the state of validation for measuring beryllium in the workplace and the environment. Documents and publications from the United States and Europe are included. Unless otherwise specified, all documents were published in English.

  3. Dream controller

    DOE Patents [OSTI]

    Cheng, George Shu-Xing; Mulkey, Steven L; Wang, Qiang; Chow, Andrew J

    2013-11-26

    A method and apparatus for intelligently controlling continuous process variables. A Dream Controller comprises an Intelligent Engine mechanism and a number of Model-Free Adaptive (MFA) controllers, each of which is suitable to control a process with specific behaviors. The Intelligent Engine can automatically select the appropriate MFA controller and its parameters so that the Dream Controller can be easily used by people with limited control experience and those who do not have the time to commission, tune, and maintain automatic controllers.

  4. The role of the United States Water Resources Engineering Community in responding to the water related needs of the developing world 

    E-Print Network [OSTI]

    Ormond, Timothy Paul

    1993-01-01

    THK ROLE OF THK UNITED STATES WATER RESOURCES ENGINEERING COMMUNITY IN RESPONDING TO THE WATER- RELATED NEEDS OF THK DEVELOPING WORLD A Thesis by TIMOTHY PAUL ORMOND Submitted to thc Office of Graduate Studies of Texas AdtM Vnivcrsdy... in partial fulfdlmcnt of the requirements for thc dcgrcc of MASTER OF SCIENCE August 1993 Major Subject: Civil Engineering THF. ROLE OF THE UNITED STATES WATER RESOURCES ENGINEERING COMMUNITY IN RESPONDING TO THE WATER-RELATED NEEDS OF THE DEVELOPING...

  5. The validity of the Background Field Approximation

    E-Print Network [OSTI]

    R. Parentani

    1997-10-10

    In the absence of a tractable theory of quantum gravity, quantum matter field effects have been so far computed by treating gravity at the Background Field Approximation. The principle aim of this paper is to investigate the validity of this approximation which is not specific to gravity. To this end, for reasons of simplicity and clarity, we shall compare the descriptions of thermal processes induced by constant acceleration (i.e. the Unruh effect) in four dynamical frameworks. In this problem, the position of the ``heavy'' accelerated system plays the role of gravity. In the first framework, the trajectory is treated at the BFA: it is given from the outset and unaffected by radiative processes. In the second one, recoil effects induced by these emission processes are taken into account by describing the system's position by WKB wave functions. In the third one, the accelerated system is described by second quantized fields and in the fourth one, gravity is turned on. It is most interesting to see when and why transitions amplitudes evaluated in different frameworks but describing the same process do agree. It is indeed this comparison that determines the validity of the BFA. It is also interesting to notice that the abandonment of the BFA delivers new physical insights concerning the processes. For instance, in the fourth framework, the ``recoils'' of gravity show that the acceleration horizon area acts as an entropy in delivering heat to accelerated systems.

  6. CASL Validation Data: An Initial Review

    SciTech Connect (OSTI)

    Nam Dinh

    2011-01-01

    The study aims to establish a comprehensive view of “data” needed for supporting implementation of the Consortium of Advanced Simulation of LWRs (CASL). Insights from this review (and its continual refinement), together with other elements developed in CASL, should provide the foundation for developing the CASL Validation Data Plan (VDP). VDP is instrumental to the development and assessment of CASL simulation tools as predictive capability. Most importantly, to be useful for CASL, the VDP must be devised (and agreed upon by all participating stakeholders) with appropriate account for nature of nuclear engineering applications, the availability, types and quality of CASL-related data, and novelty of CASL goals and its approach to the selected challenge problems. The initial review (summarized on the January 2011 report version) discusses a broad range of methodological issues in data review and Validation Data Plan. Such a top-down emphasis in data review is both needed to see a big picture on CASL data and appropriate when the actual data are not available for detailed scrutiny. As the data become available later in 2011, a revision of data review (and regular update) should be performed. It is expected that the basic framework for review laid out in this report will help streamline the CASL data review in a way that most pertinent to CASL VDP.

  7. Verification and validation for induction heating

    SciTech Connect (OSTI)

    Lam, Kin [Los Alamos National Laboratory; Tippetts, Trevor B [Los Alamos National Laboratory; Allen, David W [NON LANL

    2008-01-01

    Truchas is a software package being developed at LANL within the Telluride project for predicting the complex physical processes in metal alloy casting. The software was designed to be massively parallel, multi-material, multi-physics, and to run on 3D, fully unstructured meshes. This work describes a Verification and Validation assessment of Truchas for simulating the induction heating phase of a casting process. We used existing data from a simple experiment involving the induction heating of a graphite cylinder, as graphite is a common material used for mold assemblies. Because we do not have complete knowledge of all the conditions and properties in this experiment (as is the case in many other experiments), we performed a parameter sensitivity study, modeled the uncertainties of the most sensitive parameters, and quantified how these uncertainties propagate to the Truchas output response. A verification analysis produced estimates of the numerical error of the Truchas solution to our computational model. The outputs from Truchas runs with randomly sampled parameter values were used for the validation study.

  8. Intelligent Sensor Validation And Fusion For Vehicle Guidance Using Probabilistic And Fuzzy Methods

    E-Print Network [OSTI]

    Agogino, Alice; Goebel, Kai; Alag, Sanam

    1997-01-01

    1995. A Framework for Intelligent Sensor Validation, SensorAgogino, A. 1995. Intelligent Sensor Validation and FusionOF CALIFORNIA, BERKELEY Intelligent Sensor Validation and

  9. Real-World Hydrogen Technology Validation: Preprint

    SciTech Connect (OSTI)

    Sprik, S.; Kurtz, J.; Wipke, K.; Ramsden, T.; Ainscough, C.; Eudy, L.; Saur, G.

    2012-03-01

    The Department of Energy, the Department of Defense's Defense Logistics Agency, and the Department of Transportation's Federal Transit Administration have funded learning demonstrations and early market deployments to provide insight into applications of hydrogen technologies on the road, in the warehouse, and as stationary power. NREL's analyses validate the technology in real-world applications, reveal the status of the technology, and facilitate the development of hydrogen and fuel cell technologies, manufacturing, and operations. This paper presents the maintenance, safety, and operation data of fuel cells in multiple applications with the reported incidents, near misses, and frequencies. NREL has analyzed records of more than 225,000 kilograms of hydrogen that have been dispensed through more than 108,000 hydrogen fills with an excellent safety record.

  10. Full-Scale Cookoff Model Validation Experiments

    SciTech Connect (OSTI)

    McClelland, M A; Rattanapote, M K; Heimdahl, E R; Erikson, W E; Curran, P O; Atwood, A I

    2003-11-25

    This paper presents the experimental results of the third and final phase of a cookoff model validation effort. In this phase of the work, two generic Heavy Wall Penetrators (HWP) were tested in two heating orientations. Temperature and strain gage data were collected over the entire test period. Predictions for time and temperature of reaction were made prior to release of the live data. Predictions were comparable to the measured values and were highly dependent on the established boundary conditions. Both HWP tests failed at a weld located near the aft closure of the device. More than 90 percent of unreacted explosive was recovered in the end heated experiment and less than 30 percent recovered in the side heated test.

  11. Boron-10 Lined Proportional Counter Model Validation

    SciTech Connect (OSTI)

    Lintereur, Azaree T.; Siciliano, Edward R.; Kouzes, Richard T.

    2012-06-30

    The Department of Energy Office of Nuclear Safeguards (NA-241) is supporting the project “Coincidence Counting With Boron-Based Alternative Neutron Detection Technology” at Pacific Northwest National Laboratory (PNNL) for the development of an alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a boron-lined proportional tube-based alternative system in the configuration of a coincidence counter. This report discusses the validation studies performed to establish the degree of accuracy of the computer modeling methods current used to simulate the response of boron-lined tubes. This is the precursor to developing models for the uranium neutron coincidence collar under Task 2 of this project.

  12. responding to emergencies

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal GasAdministration Medal01 Sandia4) August 20123/%2A en46Afedkcp8/%2A4/%2A6/%2A en/%2A

  13. WORKSHEET AND RESPONDENT QUESTIONS

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming Dry NaturalPrices Globaldieselgasolinemonthlysummer gasolineall

  14. Verification and Validation Strategy for LWRS Tools

    SciTech Connect (OSTI)

    Carl M. Stoots; Richard R. Schultz; Hans D. Gougar; Thomas K Larson; Michael Corradini; Laura Swiler; David Pointer; Jess Gehin

    2012-09-01

    One intension of the Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program is to create advanced computational tools for safety assessment that enable more accurate representation of a nuclear power plant safety margin. These tools are to be used to study the unique issues posed by lifetime extension and relicensing of the existing operating fleet of nuclear power plants well beyond their first license extension period. The extent to which new computational models / codes such as RELAP-7 can be used for reactor licensing / relicensing activities depends mainly upon the thoroughness with which they have been verified and validated (V&V). This document outlines the LWRS program strategy by which RELAP-7 code V&V planning is to be accomplished. From the perspective of developing and applying thermal-hydraulic and reactivity-specific models to reactor systems, the US Nuclear Regulatory Commission (NRC) Regulatory Guide 1.203 gives key guidance to numeric model developers and those tasked with the validation of numeric models. By creating Regulatory Guide 1.203 the NRC defined a framework for development, assessment, and approval of transient and accident analysis methods. As a result, this methodology is very relevant and is recommended as the path forward for RELAP-7 V&V. However, the unique issues posed by lifetime extension will require considerations in addition to those addressed in Regulatory Guide 1.203. Some of these include prioritization of which plants / designs should be studied first, coupling modern supporting experiments to the stringent needs of new high fidelity models / codes, and scaling of aging effects.

  15. Refining and Improving Control Techniques COOPERATIVE RESEARCH AND MANAGEMEN

    E-Print Network [OSTI]

    agree that it i s good, t h a t it one member of the cooperative team. And since i s needed, and t h- and management w i l l respond with t h e i r partic- toe control practices you now use. Instead, u l a r points

  16. REFERENCE: Holt CL, Buoncristiani M, Wallin JM, Nguyen T, Lazaruk KD, Walsh PS. TWGDAM validation of AmpF STRTM

    E-Print Network [OSTI]

    that assessed re- liability and identified potential limitations. These validation studies were designed as recommended by the Technical Working Group on DNA Analysis Methods (TWGDAM) and the DNA Advisory Board (DAB polymerase, PCR primer set, positive control DNA (cell line 9947A), allelic ladder, and mineral oil. Kit

  17. Fault detection and isolation in aircraft gas turbine engines. Part 2: validation on a simulation test bed

    E-Print Network [OSTI]

    Ray, Asok

    319 Fault detection and isolation in aircraft gas turbine engines. Part 2: validation of fault detection and isolation (FDI) in aircraft gas turbine engines. The FDI algorithms are built upon,onasimulationtestbed.Thetestbedisbuiltuponanintegratedmodelofageneric two-spool turbofan aircraft gas turbine engine including the engine control system. Keywords: aircraft

  18. VEPP-2000 COLLIDER CONTROL SYSTEM* , P. Cheblakov, A. Kirpotin, I. Koop, V. Kozak, E. Kuper, A. Lysenko,

    E-Print Network [OSTI]

    Kozak, Victor R.

    VEPP-2000 COLLIDER CONTROL SYSTEM* D. Berkaev , P. Cheblakov, A. Kirpotin, I. Koop, V. Kozak, E of the collider control system. The software according to hardware system consists of interacting subsystems responding on different acceleration facility parts. Control system software is based on several TCP

  19. V-192: Symantec Security Information Manager Input Validation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Symantec Security Information Manager Input Validation Flaws Permit Cross-Site Scripting, SQL Injection, and Information Disclosure Attacks V-192: Symantec Security Information...

  20. Validation of a Small Engine Based Procedure for Studying Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Studying Performance of Engine Lube Oils, Ionic Liquids as Lubricants andor Lubricant Additives, Opportunities for Engine Friction Reduction and Durable Design Validation...

  1. Sandia Energy - Tidal & Current Modeling Development and Validation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tidal & Current Modeling Development and Validation Home Stationary Power Energy Conversion Efficiency Water Power Technology Development Tidal & Current Modeling Development and...

  2. PV Validation and Bankability Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workshop This presentation summarizes the information given by DOE during the Photovoltaic Validation and Bankability Workshop in San Jose, California, on August 31, 2011....

  3. T-701: Citrix Access Gateway Enterprise Edition Input Validation...

    Broader source: Energy.gov (indexed) [DOE]

    ABSTRACT: Citrix Access Gateway Enterprise Edition Input Validation Flaw in Logon Portal Permits Cross-Site Scripting Attacks. reference LINKS: SecurityTracker Alert ID:...

  4. Transmission Services Product Pricing Validation October 1, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: Transmission Services Product Pricing Validation Posted Date: 1012015 On October 1, 2015, at...

  5. V-192: Symantec Security Information Manager Input Validation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Security Information Manager Input Validation Flaws Permit Cross-Site Scripting, SQL Injection, and Information Disclosure Attacks V-192: Symantec Security Information...

  6. Validation in Genomics: CpG Island Methylation Revisited

    E-Print Network [OSTI]

    Segal, Mark R

    2006-01-01

    analysis. In: Functional Genomics: Methods and Protocols, M.Segal: Validation in Genomics: CpG Island Methylationpackage and applications to genomics. Bioinformatics and

  7. Annual Property Training & Validations Must be Completed Between...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Property Training & Validations Must be Completed Between March 26 & April 24 It is that time again for all property custodians to take the annual Property Custodian...

  8. Development and Validation of an Advanced Stimulation Prediction...

    Open Energy Info (EERE)

    and Validation of an Advanced Stimulation Prediction Model for Enhanced Geothermal Systems Geothermal Project Jump to: navigation, search Last modified on July 22, 2011. Project...

  9. Automation of particle accelerator control

    SciTech Connect (OSTI)

    Silbar, R.R.; Schultz, D.E.

    1988-01-01

    We have begun a program aiming toward automatic control of charged-particle beam optics using artificial intelligence programming techniques. In developing our prototype, we are working with LISP machines and the KEE expert system shell. Our first goal was to develop a 'mouseable' representation of a typical beamline. This responds actively to changes input from the mouse or keyboard, giving an updated display of the beamline itself, its optical properties, and the instrumentation and control devices as seen by the operator. We have incorporated the Fortran beam optics code TRANSPORT for simulation of the beam. The paper describes the experience gained in this process and discusses plans to extend the work so that it is usable, in real-time, on an operating beamline. 11 refs., 2 figs.

  10. Report on a workshop concerning code validation

    SciTech Connect (OSTI)

    None

    1996-12-01

    The design of wind turbine components is becoming more critical as turbines become lighter and more dynamically active. Computer codes that will reliably predict turbine dynamic response are, therefore, more necessary than before. However, predicting the dynamic response of very slender rotating structures that operate in turbulent winds is not a simple matter. Even so, codes for this purpose have been developed and tested in North America and in Europe, and it is important to disseminate information on this subject. The purpose of this workshop was to allow those involved in the wind energy industry in the US to assess the progress invalidation of the codes most commonly used for structural/aero-elastic wind turbine simulation. The theme of the workshop was, ``How do we know it`s right``? This was the question that participants were encouraged to ask themselves throughout the meeting in order to avoid the temptation of presenting information in a less-than-critical atmosphere. Other questions posed at the meeting are: What is the proof that the codes used can truthfully represent the field data? At what steps were the codes tested against known solutions, or against reliable field data? How should the designer or user validate results? What computer resources are needed? How do codes being used in Europe compare with those used in the US? How does the code used affect industry certification? What can be expected in the future?

  11. Validation of an Integrated Hydrogen Energy Station

    SciTech Connect (OSTI)

    Edward C. Heydorn

    2012-10-26

    This report presents the results of a 10-year project conducted by Air Products and Chemicals, Inc. (Air Products) to determine the feasibility of coproducing hydrogen with electricity. The primary objective was to demonstrate the technical and economic viability of a hydrogen energy station using a high-temperature fuel cell designed to produce power and hydrogen. This four-phase project had intermediate go/no-go decisions and the following specific goals: �¢���¢ Complete a technical assessment and economic analysis of the use of high-temperature fuel cells, including solid oxide and molten carbonate, for the co-production of power and hydrogen (energy park concept). �¢���¢ Build on the experience gained at the Las Vegas H2 Energy Station and compare/contrast the two approaches for co-production. �¢���¢ Determine the applicability of co-production from a high-temperature fuel cell for the existing merchant hydrogen market and for the emerging hydrogen economy. �¢���¢ Demonstrate the concept on natural gas for six months at a suitable site with demand for both hydrogen and electricity. �¢���¢ Maintain safety as the top priority in the system design and operation. �¢���¢ Obtain adequate operational data to provide the basis for future commercial activities, including hydrogen fueling stations. Work began with the execution of the cooperative agreement with DOE on 30 September 2001. During Phase 1, Air Products identified high-temperature fuel cells as having the potential to meet the coproduction targets, and the molten carbonate fuel cell system from FuelCell Energy, Inc. (FuelCell Energy) was selected by Air Products and DOE following the feasibility assessment performed during Phase 2. Detailed design, construction and shop validation testing of a system to produce 250 kW of electricity and 100 kilograms per day of hydrogen, along with site selection to include a renewable feedstock for the fuel cell, were completed in Phase 3. The system also completed six months of demonstration operation at the wastewater treatment facility operated by Orange County Sanitation District (OCSD, Fountain Valley, CA). As part of achieving the objective of operating on a renewable feedstock, Air Products secured additional funding via an award from the California Air Resources Board. The South Coast Air Quality Management District also provided cost share which supported the objectives of this project. System operation at OCSD confirmed the results from shop validation testing performed during Phase 3. Hydrogen was produced at rates and purity that met the targets from the system design basis, and coproduction efficiency exceeded the 50% target set in conjunction with input from the DOE. Hydrogen production economics, updated from the Phase 2 analysis, showed pricing of $5 to $6 per kilogram of hydrogen using current gas purification systems. Hydrogen costs under $3 per kilogram are achievable if next-generation electrochemical separation technologies become available.

  12. Ris-R-1298(EN) Validation of Satellite SAR Offshore

    E-Print Network [OSTI]

    resources, e.g. in future planning of offshore wind farms. The report describes the validation analysisRisø-R-1298(EN) Validation of Satellite SAR Offshore Wind Speed Maps to In-Situ Data, Microscale project goal is to develop a method for utilizing the satellite wind speed maps for offshore wind

  13. VALIDATION OF SPECTRAL UNMIXING METHODS USING PHOTOMETRY AND TOPOGRAPHY INFORMATION

    E-Print Network [OSTI]

    Plaza, Antonio J.

    VALIDATION OF SPECTRAL UNMIXING METHODS USING PHOTOMETRY AND TOPOGRAPHY INFORMATION Rubén Marrero1 topography and photometry of the scene. The validation of the different methods and deconvolution processes topography and most importantly photometry are precisely known. On the other hand better distribution maps

  14. Performance Validation and Energy Analysis of HVAC Systems using Simulation

    E-Print Network [OSTI]

    1 Performance Validation and Energy Analysis of HVAC Systems using Simulation Tim Salsbury and Rick This paper describes the concept of using simulation as a tool for performance validation and energy analysis and supervision of building systems in order to optimize operational performance. The paper describes one way

  15. Validation of operational ozone profiles from the Ozone Monitoring Instrument

    E-Print Network [OSTI]

    Validation of operational ozone profiles from the Ozone Monitoring Instrument M. Kroon,1 J. F. de we present the validation results of the operational vertical ozone profiles retrieved from the nadir observations by the Ozone Monitoring Instrument (OMI) aboard the NASA Earth Observing System (EOS) Aura

  16. Technology Validation Hydrogen and fuel cells are a critical

    E-Print Network [OSTI]

    barriers for future R&D efforts. The data collected also helps to develop statistical confidence. The Fuel Cell Technologies (FCT) Office, through its Technology Validation program, provides a crucial step), and a driving range of more than 250 miles between refueling. The program also validated one vehicle outside

  17. Automated Validation of Class Invariants In C ++ Applications

    E-Print Network [OSTI]

    Malloy, Brian

    of the invariants. We describe both our approach and our results of validating invariants in keystone, a well tested of the invariants. We describe both our approach and our results of validating invariants in keystone, a well tested pattern, class invariants, OCL and keystone. In Section 3, we overview our approach including a de

  18. Automated Validation of Class Invariants In C++ Applications

    E-Print Network [OSTI]

    Malloy, Brian

    of the invariants. We describe both our approach and our results of validating invariants in keystone, a well tested of the invariants. We describe both our approach and our results of validating invariants in keystone, a well tested pattern, class invariants, OCL and keystone. In Section 3, we overview our approach including a de

  19. An Experimental Study on Validation Problems with Existing HTML Webpages

    E-Print Network [OSTI]

    Shen, Vincent Yun

    the results of an experimental study on the validation problem of existing HTML pages in the World Wide Web, Verification Keywords HTML Specification, HTML Validator, HTML tidy tools, W3C, webpage characteristics, Web Web Consortium (W3C) released the HTML (Hyper- Text Markup Language) Recommendation in 1995

  20. Roll-up of validation results to a target application.

    SciTech Connect (OSTI)

    Hills, Richard Guy

    2013-09-01

    Suites of experiments are preformed over a validation hierarchy to test computational simulation models for complex applications. Experiments within the hierarchy can be performed at different conditions and configurations than those for an intended application, with each experiment testing only part of the physics relevant for the application. The purpose of the present work is to develop methodology to roll-up validation results to an application, and to assess the impact the validation hierarchy design has on the roll-up results. The roll-up is accomplished through the development of a meta-model that relates validation measurements throughout a hierarchy to the desired response quantities for the target application. The meta-model is developed using the computation simulation models for the experiments and the application. The meta-model approach is applied to a series of example transport problems that represent complete and incomplete coverage of the physics of the target application by the validation experiments.

  1. Bromocriptine increased operant responding for high fat food but decreased chow intake in both obesity-prone and resistant rats

    SciTech Connect (OSTI)

    Thanos, P.K.; Wang, G.; Thanos, P.K.; Cho, J. Kim, R.; Michaelides, M.; Primeaux, S.; Bray, G.; Wang, G.-J.; Volkow, N.D.

    2010-10-27

    Dopamine (DA) and DAD{sub 2} receptors (D2R) have been implicated in obesity and are thought to be involved in the rewarding properties of food. Osborne-Mendel (OM) rats are susceptible to diet induced obesity (DIO) while S5B/P (S5B) rats are resistant when given a high-fat diet. Here we hypothesized that the two strains would differ in high-fat food self-administration (FSA) and that the D2R agonist bromocriptine (BC) would differently affect their behavior. Ad-libitum fed OM and S5B/P rats were tested in a FSA operant chamber and were trained to lever press for high-fat food pellets under a fixed-ratio (FR1) and a progressive ratio (PR) schedule. After sixteen days of PR sessions, rats were treated with three different doses of BC (1, 10 and 20 mg/kg). No significant differences were found between the two strains in the number of active lever presses. BC treatment (10 mg/kg and 20 mg/kg) increased the number of active lever presses (10 mg/kg having the strongest effect) whereas it decreased rat chow intake in the home cage with equivalent effects in both strains. These effects were not observed on the day of BC administration but on the day following its administration. Our results suggest that these two strains have similar motivation for procuring high fat food using this paradigm. BC increased operant responding for high-fat pellets but decreased chow intake in both strains, suggesting that D2R stimulation may have enhanced the motivational drive to procure the fatty food while correspondingly decreasing the intake of regular food. These findings suggest that susceptibility to dietary obesity (prior to the onset of obesity) may not affect operant motivation for a palatable high fat food and that differential susceptibility to obesity may be related to differential sensitivity to D2R stimulation.

  2. Optimal Control of Quantum Measurement

    E-Print Network [OSTI]

    Daniel J. Egger; Frank K. Wilhelm

    2014-08-26

    Pulses to steer the time evolution of quantum systems can be designed with optimal control theory. In most cases it is the coherent processes that can be controlled and one optimizes the time evolution towards a target unitary process, sometimes also in the presence of non-controllable incoherent processes. Here we show how to extend the GRAPE algorithm in the case where the incoherent processes are controllable and the target time evolution is a non-unitary quantum channel. We perform a gradient search on a fidelity measure based on Choi matrices. We illustrate our algorithm by optimizing a phase qubit measurement pulse. We show how this technique can lead to large measurement contrast close to 99%. We also show, within the validity of our model, that this algorithm can produce short 1.4 ns pulses with 98.2% contrast.

  3. H Zhu, Validating Algebraic Class Testing in Final Algebra January 16, 2002 Validating Algebraic Class Testing in Final Algebra

    E-Print Network [OSTI]

    Zhu, Hong

    H Zhu, Validating Algebraic Class Testing in Final Algebra January 16, 2002 1 Validating Algebraic Class Testing in Final Algebra Hong Zhu Department of Computing, Oxford Brookes University Wheatley Campus, Oxford OX33 1HX, UK, Email: hzhu@brookes.ac.uk Abstract Algebraic class testing is an object

  4. "In terms of the long-term outlook for biomass and biofuels, the largest proportion of Business Insights industry survey respondents

    E-Print Network [OSTI]

    production and consumption expansion will depend heavily on incentives frameworks in order to stimulate and hydrogen and production, storage and consumption issues. What impact will biofuels production have fuel production by 2017. A further 25% of respondents thought that biofuels would account for 2

  5. REPORTS FROM PROFESSIONAL, STATUTORY AND REGULATORY BODIES 1.1 The purpose of this procedure is to ensure that the College responds to

    E-Print Network [OSTI]

    Daley, Monica A.

    REPORTS FROM PROFESSIONAL, STATUTORY AND REGULATORY BODIES 1. PURPOSE 1.1 The purpose of this procedure is to ensure that the College responds to reports on its academic provision from professional.1 This procedure currently encompasses reports from RCVS, AVMA, EAEVE, QAA, the Society of Biology, and any other

  6. U of A responds to community (Edmonton) Economic development in Alberta has received a boost from the University of Alberta, with a new community planning

    E-Print Network [OSTI]

    Machel, Hans

    U of A responds to community (Edmonton) Economic development in Alberta has received a boost from the University of Alberta, with a new community planning program that will help to fill a critical planners in Alberta where the scarcity of planners stymies development, he says, and can result in projects

  7. Next Generation Nuclear Plant Resilient Control System Functional Analysis

    SciTech Connect (OSTI)

    Lynne M. Stevens

    2010-07-01

    Control Systems and their associated instrumentation must meet reliability, availability, maintainability, and resiliency criteria in order for high temperature gas-cooled reactors (HTGRs) to be economically competitive. Research, perhaps requiring several years, may be needed to develop control systems to support plant availability and resiliency. This report functionally analyzes the gaps between traditional and resilient control systems as applicable to HTGRs, which includes the Next Generation Nuclear Plant; defines resilient controls; assesses the current state of both traditional and resilient control systems; and documents the functional gaps existing between these two controls approaches as applicable to HTGRs. This report supports the development of an overall strategy for applying resilient controls to HTGRs by showing that control systems with adequate levels of resilience perform at higher levels, respond more quickly to disturbances, increase operational efficiency, and increase public protection.

  8. Project Controls

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  9. VALIDATION OF ANALYTICAL METHODS AND INSTRUMENTATION FOR BERYLLIUM MEASUREMENT: REVIEW AND SUMMARY OF AVAILABLE GUIDES, PROCEDURES, AND PROTOCOLS

    SciTech Connect (OSTI)

    Ekechukwu, A

    2009-05-27

    Method validation is the process of evaluating whether an analytical method is acceptable for its intended purpose. For pharmaceutical methods, guidelines from the United States Pharmacopeia (USP), International Conference on Harmonisation (ICH), and the United States Food and Drug Administration (USFDA) provide a framework for performing such valications. In general, methods for regulatory compliance must include studies on specificity, linearity, accuracy, precision, range, detection limit, quantitation limit, and robustness. Elements of these guidelines are readily adapted to the issue of validation for beryllium sampling and analysis. This document provides a listing of available sources which can be used to validate analytical methods and/or instrumentation for beryllium determination. A literature review was conducted of available standard methods and publications used for method validation and/or quality control. A comprehensive listing of the articles, papers and books reviewed is given in the Appendix. Available validation documents and guides are listed therein; each has a brief description of application and use. In the referenced sources, there are varying approches to validation and varying descriptions of the valication process at different stages in method development. This discussion focuses on valication and verification of fully developed methods and instrumentation that have been offered up for use or approval by other laboratories or official consensus bodies such as ASTM International, the International Standards Organization (ISO) and the Association of Official Analytical Chemists (AOAC). This review was conducted as part of a collaborative effort to investigate and improve the state of validation for measuring beryllium in the workplace and the environment. Documents and publications from the United States and Europe are included. Unless otherwise specified, all referenced documents were published in English.

  10. THE VALIDITY OF HUMAN AND COMPUTERIZED WRITING ASSESSMENT

    SciTech Connect (OSTI)

    Ronald L. Boring

    2005-09-01

    This paper summarizes an experiment designed to assess the validity of essay grading between holistic and analytic human graders and a computerized grader based on latent semantic analysis. The validity of the grade was gauged by the extent to which the student’s knowledge of the topic correlated with the grader’s expert knowledge. To assess knowledge, Pathfinder networks were generated by the student essay writers, the holistic and analytic graders, and the computerized grader. It was found that the computer generated grades more closely matched the definition of valid grading than did human generated grades.

  11. CONFIDENTIAL -encanadacgpss2013reports.xlsx All Respondents (No Filter) CANADIAN GRADUATE AND PROFESSIONAL STUDENT SURVEY -2013 NATIONAL DATA -ALL CANADA

    E-Print Network [OSTI]

    Wang, Hao "Howard"

    Responses 51,621 Valid 51,634 Total Responses 51,682 Total 51,682 Q2: In what disciplinary area are you.3% 32,705 3.0% 1,559 6.5% 3,358 32.4% 16,720 30.2% 15,619 Valid Responses 51,682 Valid 51,682 Total Responses 51,682 Total 51,682 SECTION 1 - EDUCATIONAL STATUS Q1: At which degree level are you currently

  12. Particulate dispersion apparatus for the validation of plume models 

    E-Print Network [OSTI]

    Bala, William D

    2001-01-01

    The purpose of this thesis is to document design, development, and fabrication of a transportable source of dry aerosol to improve testing and validation of atmospheric plume models. The proposed dispersion apparatus is intended to complement...

  13. Field validation of monitoring method for ditertiary butylperoxide (DTBP) 

    E-Print Network [OSTI]

    Stansbury, Anna Michelle

    1997-01-01

    In this field study, a new air monitoring method, developed in the laboratory for measuring occupational exposure to ditertiary butylperoxide (DTBP) was validated by testing the overall accuracy and precision of the technique under more realistic...

  14. Validation of the G-PASS code : status report.

    SciTech Connect (OSTI)

    Vilim, R. B.; Nuclear Engineering Division

    2009-03-12

    Validation is the process of determining whether the models in a computer code can describe the important phenomena in applications of interest. This report describes past work and proposed future work for validating the Gas Plant Analyzer and System Simulator (G-PASS) code. The G-PASS code was developed for simulating gas reactor and chemical plant system behavior during operational transients and upset events. Results are presented comparing code properties, individual component models, and integrated system behavior against results from four other computer codes. Also identified are two experiment facilities nearing completion that will provide additional data for individual component and integrated system model validation. The main goal of the validation exercise is to ready a version of G-PASS for use as a tool in evaluating vendor designs and providing guidance to vendors on design directions in nuclear-hydrogen applications.

  15. Multi-terminal Subsystem Model Validation for Pacific DC Intertie

    SciTech Connect (OSTI)

    Yang, Bo; Huang, Zhenyu; Kosterev, Dmitry

    2008-07-20

    this paper proposes to validate dynamic model of Pacific DC Intertie with the concept of hybrid simulation by combing simulation with PMU measurements. The Playback function available in GE PSLF is adopted for hybrid simulation. It is demonstrated for the first time the feasibility of using Playback function on multi-terminal subsystem. Sensitivity studies are also presented as a result of common PMU measurement quality problem, ie, offset noise and time synchronization. Results indicate a good tolerance of PDCI model generally. It is recommended that requirements should apply to phasor measurements in model validation work to ensure better analysis. Key parameters are identified based on impact of value change to model behavior. Two events are employed for preliminary model validation with PMU measurements. Suggestions are made for PDCI model validation work in the future.

  16. Biological Cluster Validity Indices Based on the Gene Ontology

    E-Print Network [OSTI]

    Zell, Andreas

    Biological Cluster Validity Indices Based on the Gene Ontology Nora Speer, Christian Spieth 3646, pp. 429­439, 2005. c Springer-Verlag Berlin Heidelberg 2005 #12;430 N. Speer, C. Spieth, and A

  17. O`ahu Grid Study: Validation of Grid Models

    E-Print Network [OSTI]

    O`ahu Grid Study: Validation of Grid Models Prepared for the U.S. Department of Energy Office Resource Technologies for Energy Security Subtask 7.2 Deliverable By GE Global Research Niskayuna, New York

  18. System development & validation process for emerging growing organizations

    E-Print Network [OSTI]

    Almazán López, José Antonio

    2009-01-01

    This thesis has the main purpose of presenting the Development and Validation phase of the product development system from the point of view of an emerging and growing product development organization, denoting the obstacles ...

  19. Original Valid Refugee Visa Complete Fees Quotation Form

    E-Print Network [OSTI]

    Wagner, Stephan

    Original Valid Refugee Visa Complete Fees Quotation Form Form to be completed by student (personal information) Faculty Staff Member to complete (Course Codes and Type of Registration i.e. Refugee). Form

  20. Is emotional intelligence worthwhile?: Assessing incremental validity and adverse impact 

    E-Print Network [OSTI]

    Rhodes, Dana Lanay

    2009-05-15

    several contributions: (a) a summary of theoretical links between EI and job performance, (b) meta-analytic incremental validity estimation for two different conceptualizations of emotional intelligence – labeled ability EI and mixed EI – over and above...

  1. Bayesian-based simulation model validation for spacecraft thermal systems

    E-Print Network [OSTI]

    Stout, Kevin Dale

    2015-01-01

    Over the last several decades of space flight, spacecraft thermal system modeling software has advanced significantly, but the model validation process, in general, has changed very little. Although most thermal systems ...

  2. Psychometric validation of the Hispanic Bilingual Gifted Screening Instrument (HBGSI) 

    E-Print Network [OSTI]

    Fultz, Monica V.

    2005-08-29

    research is recommended to establish the concurrent validity of the HBGSI with other achievement measures. In conclusion, there has been a contemporary move to the incorporation of inclusive screening instruments for use with language minority students...

  3. LLNL Final Design for PDV Measurements of Godiva for Validation...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: LLNL Final Design for PDV Measurements of Godiva for Validation of Multi-Physics Simulation Citation Details In-Document Search Title: LLNL Final Design for PDV...

  4. Validation of an improved computer algorithm for precipitation echo classification 

    E-Print Network [OSTI]

    Amrhein, Edward Thomas

    2001-01-01

    A validation of an improved radar reflectivity partitioning scheme was performed using radar data collected for three separate precipitation systems in Central Texas. The improved algorithm was compared to a previously ...

  5. From Validation to Automated Repair & Beyond with Constraint Solving

    E-Print Network [OSTI]

    Samimi, Hesam

    2013-01-01

    used to validate HTML output from web applica- tions [Min05,The class of web applications used to generate HTML are anPHP web applications routinely generate invalid HTML. Modern

  6. Development and Validation of an Occupational Skills Assessment Instrument

    E-Print Network [OSTI]

    Mathews, R. Mark; Whang, Paula L.; Fawcett, Stephen B.

    1980-01-01

    The development and validation of an occupational skills assessment instrument is described. The instrument was designed to describe accurately a participant's actual level of occupational skills in a variety of job-related ...

  7. Reconceptualising public acceptability: A study of the ways people respond to policies aimed to reduce alcohol consumption

    E-Print Network [OSTI]

    Cohn, Simon

    2015-03-13

    of government attempts to control drinking and the intersection ‘of individual behaviour with state regulation’ (Malleck, 2012: 8) have drawn on such concepts as bio- power and governmentality to explore the ways policies are traditionally designed to both... from what has happened elsewhere and, uninterrupted for a few minutes, returns to draw on other examples to emphasise his general point: … this new drug in Russia … it’s been nicknamed Crocodile … it’s very cheap heroin basically so as the price...

  8. Stochastic Control Analysis for Biochemical Reaction Systems

    E-Print Network [OSTI]

    Kyung Hyuk Kim; Herbert M. Sauro

    2009-08-21

    In this paper, we investigate how stochastic reaction processes are affected by external perturbations. We describe an extension of the deterministic metabolic control analysis (MCA) to the stochastic regime. We introduce stochastic sensitivities for mean and covariance values of reactant concentrations and reaction fluxes and show that there exist MCA-like summation theorems among these sensitivities. The summation theorems for flux variances are shown to depend on the size of the measurement time window ($\\epsilon$), within which reaction events are counted for measuring a single flux. The degree of the $\\epsilon$-dependency can become significant for processes involving multi-time-scale dynamics and is estimated by introducing a new measure of time scale separation. This $\\epsilon$-dependency is shown to be closely related to the power-law scaling observed in flux fluctuations in various complex networks. We propose a systematic way to control fluctuations of reactant concentrations while minimizing changes in mean concentration levels. Such orthogonal control is obtained by introducing a control vector indicating the strength and direction of parameter perturbations leading to a sensitive control. We also propose a possible implication in the control of flux fluctuation: The control distribution for flux fluctuations changes with the measurement time window size, $\\epsilon$. When a control engineer applies a specific control operation on a reaction system, the system can respond contrary to what is expected, depending on the time window size $\\epsilon$.

  9. Validating Savings Claims of Cold Climate Zero Energy Ready Homes

    SciTech Connect (OSTI)

    Williamson, J.; Puttagunta, S.

    2015-06-05

    This study was intended to validate actual performance of three ZERHs in the Northeast to energy models created in REM/Rate v14.5 (one of the certified software programs used to generate a HERS Index) and the National Renewable Energy Laboratory’s Building Energy Optimization (BEopt™) v2.3 E+ (a more sophisticated hourly energy simulation software). This report details the validation methods used to analyze energy consumption at each home.

  10. Validity and limitations of gas-drive relative permeability measurement 

    E-Print Network [OSTI]

    Gupta, Anand Kumar

    1971-01-01

    VALIDITY AND LIMITATIONS OF GAS-DRIVE RELA TI VE PERMEABILITY MEASUREMEN T A Thesis by ANAND KUMAR GUPTA Submitted to the Graduate College of Texas ARM University in partial fulfillxnent of the requirement for the degree of MASTER Ok SCIENCE... August, 1971 Major Subject: Petroleum Engineering VALIDITY AND LIMITATIONS OF GAS-DRIVE RELATIVE PERMEABILITY MEASUREMENT A Thesis by ANAND KUMAR GUPTA Approved as to style and content by: ( airman of Committee) ber) Head of Department) (Member...

  11. NREL Develops New Controls that Proactively Adapt to the Wind (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-11-01

    Until now, wind turbine controls that reduce the impacts of wind gusts and turbulence were always reactive-responding to the wind rather than anticipating it. But with today's laser-based sensors that measure wind speed ahead of the turbine, researchers at the National Renewable Energy Laboratory (NREL) and their industry partners are developing more intelligent controls. The world's first field tests of these controls are currently underway at the National Wind Technology Center (NWTC) at NREL, with plans for future commercialization.

  12. NREL Develops New Controls that Proactively Adapt to the Wind (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-10-01

    Until now, wind turbine controls that reduce the impacts of wind gusts and turbulence were always reactive -- responding to the wind rather than anticipating it. But with today's laser-based sensors that measure wind speed ahead of the turbine, researchers at the National Renewable Energy Laboratory (NREL) and their industry partners are developing more intelligent controls. The world's first field tests of these controls are currently underway at the National Wind Technology Center (NWTC) at NREL, with plans for future commercialization.

  13. Data validation and security for reprocessing.

    SciTech Connect (OSTI)

    Tolk, Keith Michael; Merkle, Peter Benedict; DurÔan, Felicia Angelica; Cipiti, Benjamin B.

    2008-10-01

    Next generation nuclear fuel cycle facilities will face strict requirements on security and safeguards of nuclear material. These requirements can result in expensive facilities. The purpose of this project was to investigate how to incorporate safeguards and security into one plant monitoring system early in the design process to take better advantage of all plant process data, to improve confidence in the operation of the plant, and to optimize costs. An existing reprocessing plant materials accountancy model was examined for use in evaluating integration of safeguards (both domestic and international) and security. International safeguards require independent, secure, and authenticated measurements for materials accountability--it may be best to design stand-alone systems in addition to domestic safeguards instrumentation to minimize impact on operations. In some cases, joint-use equipment may be appropriate. Existing domestic materials accountancy instrumentation can be used in conjunction with other monitoring equipment for plant security as well as through the use of material assurance indicators, a new metric for material control that is under development. Future efforts will take the results of this work to demonstrate integration on the reprocessing plant model.

  14. Criticality Safety Code Validation with LWBR’s SB Cores

    SciTech Connect (OSTI)

    Putman, Valerie Lee

    2003-01-01

    The first set of critical experiments from the Shippingport Light Water Breeder Reactor Program included eight, simple geometry critical cores built with 233UO2-ZrO2, 235UO2-ZrO2, ThO2, and ThO2-233UO2 nuclear materials. These cores are evaluated, described, and modeled to provide benchmarks and validation information for INEEL criticality safety calculation methodology. In addition to consistency with INEEL methodology, benchmark development and nuclear data are consistent with International Criticality Safety Benchmark Evaluation Project methodology.Section 1 of this report introduces the experiments and the reason they are useful for validating some INEEL criticality safety calculations. Section 2 provides detailed experiment descriptions based on currently available experiment reports. Section 3 identifies criticality safety validation requirement sources and summarizes requirements that most affect this report. Section 4 identifies relevant hand calculation and computer code calculation methodologies used in the experiment evaluation, benchmark development, and validation calculations. Section 5 provides a detailed experiment evaluation. This section identifies resolutions for currently unavailable and discrepant information. Section 5 also reports calculated experiment uncertainty effects. Section 6 describes the developed benchmarks. Section 6 includes calculated sensitivities to various benchmark features and parameters. Section 7 summarizes validation results. Appendices describe various assumptions and their bases, list experimenter calculations results for items that were independently calculated for this validation work, report other information gathered and developed by SCIENTEC personnel while evaluating these same experiments, and list benchmark sample input and miscellaneous supplementary data.

  15. Temperature and heat flux datasets of a complex object in a fire plume for the validation of fire and thermal response codes.

    SciTech Connect (OSTI)

    Jernigan, Dann A.; Blanchat, Thomas K.

    2010-09-01

    It is necessary to improve understanding and develop temporally- and spatially-resolved integral scale validation data of the heat flux incident to a complex object in addition to measuring the thermal response of said object located within the fire plume for the validation of the SIERRA/FUEGO/SYRINX fire and SIERRA/CALORE codes. To meet this objective, a complex calorimeter with sufficient instrumentation to allow validation of the coupling between FUEGO/SYRINX/CALORE has been designed, fabricated, and tested in the Fire Laboratory for Accreditation of Models and Experiments (FLAME) facility. Validation experiments are specifically designed for direct comparison with the computational predictions. Making meaningful comparison between the computational and experimental results requires careful characterization and control of the experimental features or parameters used as inputs into the computational model. Validation experiments must be designed to capture the essential physical phenomena, including all relevant initial and boundary conditions. This report presents the data validation steps and processes, the results of the penlight radiant heat experiments (for the purpose of validating the CALORE heat transfer modeling of the complex calorimeter), and the results of the fire tests in FLAME.

  16. Alaska North Slope Tundra Travel Model and Validation Study

    SciTech Connect (OSTI)

    Harry R. Bader; Jacynthe Guimond

    2006-03-01

    The Alaska Department of Natural Resources (DNR), Division of Mining, Land, and Water manages cross-country travel, typically associated with hydrocarbon exploration and development, on Alaska's arctic North Slope. This project is intended to provide natural resource managers with objective, quantitative data to assist decision making regarding opening of the tundra to cross-country travel. DNR designed standardized, controlled field trials, with baseline data, to investigate the relationships present between winter exploration vehicle treatments and the independent variables of ground hardness, snow depth, and snow slab thickness, as they relate to the dependent variables of active layer depth, soil moisture, and photosynthetically active radiation (a proxy for plant disturbance). Changes in the dependent variables were used as indicators of tundra disturbance. Two main tundra community types were studied: Coastal Plain (wet graminoid/moist sedge shrub) and Foothills (tussock). DNR constructed four models to address physical soil properties: two models for each main community type, one predicting change in depth of active layer and a second predicting change in soil moisture. DNR also investigated the limited potential management utility in using soil temperature, the amount of photosynthetically active radiation (PAR) absorbed by plants, and changes in microphotography as tools for the identification of disturbance in the field. DNR operated under the assumption that changes in the abiotic factors of active layer depth and soil moisture drive alteration in tundra vegetation structure and composition. Statistically significant differences in depth of active layer, soil moisture at a 15 cm depth, soil temperature at a 15 cm depth, and the absorption of photosynthetically active radiation were found among treatment cells and among treatment types. The models were unable to thoroughly investigate the interacting role between snow depth and disturbance due to a lack of variability in snow depth cover throughout the period of field experimentation. The amount of change in disturbance indicators was greater in the tundra communities of the Foothills than in those of the Coastal Plain. However the overall level of change in both community types was less than expected. In Coastal Plain communities, ground hardness and snow slab thickness were found to play an important role in change in active layer depth and soil moisture as a result of treatment. In the Foothills communities, snow cover had the most influence on active layer depth and soil moisture as a result of treatment. Once certain minimum thresholds for ground hardness, snow slab thickness, and snow depth were attained, it appeared that little or no additive effect was realized regarding increased resistance to disturbance in the tundra communities studied. DNR used the results of this modeling project to set a standard for maximum permissible disturbance of cross-country tundra travel, with the threshold set below the widely accepted standard of Low Disturbance levels (as determined by the U.S. Fish and Wildlife Service). DNR followed the modeling project with a validation study, which seemed to support the field trial conclusions and indicated that the standard set for maximum permissible disturbance exhibits a conservative bias in favor of environmental protection. Finally DNR established a quick and efficient tool for visual estimations of disturbance to determine when investment in field measurements is warranted. This Visual Assessment System (VAS) seemed to support the plot disturbance measurements taking during the modeling and validation phases of this project.

  17. Evaluation of Possible Surrogates for Validation of the Oxidation Furnace for the Plutonium Disposition Project

    SciTech Connect (OSTI)

    Duncan, A.

    2007-12-31

    The Plutonium Disposition project (PuD) is considering an alternative furnace design for direct metal oxidation (DMO) of plutonium metal to use as a feed for potential disposition routes. The proposed design will use a retort to oxidize the feed at temperatures up to 500 C. The atmosphere will be controlled using a metered mixture of oxygen, helium and argon to control the oxidation at approximately 400 torr. Since plutonium melts at 664 C, and may potentially react with retort material to form a lower melting point eutectic, the oxidation process will be controlled by metering the flow of oxygen to ensure that the bulk temperature of the material does not exceed this temperature. A batch processing time of <24 hours is desirable to meet anticipated furnace throughput requirements. The design project includes demonstration of concept in a small-scale demonstration test (i.e., small scale) and validation of design in a full-scale test. These tests are recommended to be performed using Pu surrogates due to challenges in consideration of the nature of plutonium and operational constraints required when handling large quantities of accountable material. The potential for spreading contamination and exposing workers to harmful levels of cumulative radioactive dose are motivation to utilize non-radioactive surrogates. Once the design is demonstrated and optimized, implementation would take place in a facility designed to accommodate these constraints. Until then, the use of surrogates would be a safer, less expensive option for the validation phase of the project. This report examines the potential for use of surrogates in the demonstration and validation of the DMO furnace for PuD. This report provides a compilation of the technical information and process requirements for the conversion of plutonium metal to oxide by burning in dry environments. Several potential surrogates were evaluated by various criteria in order to select a suitable candidate for large scale demonstration. First, the structure of the plutonium metal/oxide interface was compared to potential surrogates. Second the data for plutonium oxidation kinetics were reviewed and rates for oxidation were compared with surrogates. The criteria used as a basis for recommendation was selected in order to provide a reasonable oxidation rate during the validation phase. Several reference documents were reviewed and used to compile the information in this report. Since oxidation of large monolithic pieces of plutonium in 75% oxygen is the preferable oxidizing atmosphere for the intended process, this report does not focus on the oxidation of powders, but focuses instead on larger samples in flowing gas.

  18. Flea Control 

    E-Print Network [OSTI]

    Merchant, Michael E.

    2002-08-23

    This publication will help you identify fleas and learn their behaviors and potential dangers to pets and humans. Included are methods for controlling fleas indoors and out....

  19. Tick Control 

    E-Print Network [OSTI]

    Merchant, Michael E.

    2002-08-23

    This publication will help you identify ticks and learn their behaviors and potential dangers. Included are methods for avoiding, controlling and removing ticks....

  20. Motivation HDFs Algorithms Cross Validation Predictions Combating Viruses by Targeting Host Proteins

    E-Print Network [OSTI]

    Zhang, Liqing

    Motivation HDFs Algorithms Cross Validation Predictions Combating Viruses by Targeting Host Combating Viruses by Targeting Host Proteins #12;Motivation HDFs Algorithms Cross Validation Predictions Proteins #12;Motivation HDFs Algorithms Cross Validation Predictions Pathogens are Becoming Drug

  1. The SCALE Verified, Archived Library of Inputs and Data - VALID

    SciTech Connect (OSTI)

    Marshall, William BJ J; Rearden, Bradley T

    2013-01-01

    The Verified, Archived Library of Inputs and Data (VALID) at ORNL contains high quality, independently reviewed models and results that improve confidence in analysis. VALID is developed and maintained according to a procedure of the SCALE quality assurance (QA) plan. This paper reviews the origins of the procedure and its intended purpose, the philosophy of the procedure, some highlights of its implementation, and the future of the procedure and associated VALID library. The original focus of the procedure was the generation of high-quality models that could be archived at ORNL and applied to many studies. The review process associated with model generation minimized the chances of errors in these archived models. Subsequently, the scope of the library and procedure was expanded to provide high quality, reviewed sensitivity data files for deployment through the International Handbook of Evaluated Criticality Safety Benchmark Experiments (IHECSBE). Sensitivity data files for approximately 400 such models are currently available. The VALID procedure and library continue fulfilling these multiple roles. The VALID procedure is based on the quality assurance principles of ISO 9001 and nuclear safety analysis. Some of these key concepts include: independent generation and review of information, generation and review by qualified individuals, use of appropriate references for design data and documentation, and retrievability of the models, results, and documentation associated with entries in the library. Some highlights of the detailed procedure are discussed to provide background on its implementation and to indicate limitations of data extracted from VALID for use by the broader community. Specifically, external users of data generated within VALID must take responsibility for ensuring that the files are used within the QA framework of their organization and that use is appropriate. The future plans for the VALID library include expansion to include additional experiments from the IHECSBE, to include experiments from areas beyond criticality safety, such as reactor physics and shielding, and to include application models. In the future, external SCALE users may also obtain qualification under the VALID procedure and be involved in expanding the library. The VALID library provides a pathway for the criticality safety community to leverage modeling and analysis expertise at ORNL.

  2. Centralized Stochastic Optimal Control of Complex Systems

    SciTech Connect (OSTI)

    Malikopoulos, Andreas

    2015-01-01

    In this paper we address the problem of online optimization of the supervisory power management control in parallel hybrid electric vehicles (HEVs). We model HEV operation as a controlled Markov chain using the long-run expected average cost per unit time criterion, and we show that the control policy yielding the Pareto optimal solution minimizes the average cost criterion online. The effectiveness of the proposed solution is validated through simulation and compared to the solution derived with dynamic programming using the average cost criterion.

  3. Nederlandse samenvatting Binge or Control? Assessment of the validity, treatment and

    E-Print Network [OSTI]

    van den Brink, Jeroen

    Eetbuistoornis. De eetbuistoornis is een van de eetstoornissen naast anorexia nervosa en boulimia nervosa. Begin

  4. V-139: Cisco Network Admission Control Input Validation Flaw Lets Remote

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematics And Statistics » USAJobs Search USAJobs SearchWater-Savingof EnergyVulnerabilities7:

  5. Behavior-Based Methods for Modeling and Structuring Control of Social Robots

    E-Print Network [OSTI]

    Mataric, Maja J.

    -to-end validation of social theories that deal with self-referential notions and require validation. A centralBehavior-Based Methods for Modeling and Structuring Control of Social Robots Dylan A. Shell social biological systems. A working robotic imple- mentation based on a biologically plausible model

  6. Advanced nuclear plant control complex

    DOE Patents [OSTI]

    Scarola, Kenneth (Windsor, CT); Jamison, David S. (Windsor, CT); Manazir, Richard M. (North Canton, CT); Rescorl, Robert L. (Vernon, CT); Harmon, Daryl L. (Enfield, CT)

    1993-01-01

    An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

  7. Strategy for experimental validation of waste package performance assessment

    SciTech Connect (OSTI)

    Bates, J.K.; Abrajano, T.A. Jr.; Wronkiewicz, D.J.; Gerding, T.J.; Seils, C.A.

    1990-07-01

    A strategy for the experimental validation of waste package performance assessment has been developed as part of a program supported by the Repository Technology Program. The strategy was developed by reviewing the results of laboratory analog experiments, in-situ tests, repository simulation tests, and material interaction tests. As a result of the review, a listing of dependent and independent variables that influence the ingress of water into the near-field environment, the reaction between water and the waste form, and the transport of radionuclides from the near-field environment was developed. The variables necessary to incorporate into an experimental validation strategy were chosen by identifying those which had the greatest effect of each of the three major events, i.e., groundwater ingress, waste package reactions, and radionuclide transport. The methodology to perform validation experiments was examined by utilizing an existing laboratory analog approach developed for unsaturated testing of glass waste forms. 185 refs., 9 figs., 2 tabs.

  8. Validity of Thermodynamical Laws in Dark Energy Filled Universe

    E-Print Network [OSTI]

    Samarpita Bhattacharya; Ujjal Debnath

    2010-12-26

    We have considered the flat FRW model of the universe which is filled with only dark energy. The general descriptions of first and second laws of thermodynamics are investigated on the apparent horizon and event horizon of the universe. We have assumed the equation of state of three different types of dark energy models. We have examined the validity of first and second laws of thermodynamics on apparent and event horizons for these dark energies. For these dark energy models, it has been found that on the apparent horizon, first and second laws are always valid. On the event horizon, the laws are break down for dark energy models 1 and 2. For model 3, first law cannot be satisfied on the event horizon, but second law may be satisfied at the late stage of the evolution of the universe and so the validity of second law on the event horizon depends on the values of the parameters only.

  9. Development and Validation of a Lifecycle-based Prognostics Architecture with Test Bed Validation

    SciTech Connect (OSTI)

    Hines, J. Wesley; Upadhyaya, Belle; Sharp, Michael; Ramuhalli, Pradeep; Jeffries, Brien; Nam, Alan; Strong, Eric; Tong, Matthew; Welz, Zachary; Barbieri, Federico; Langford, Seth; Meinweiser, Gregory; Weeks, Matthew

    2014-11-06

    On-line monitoring and tracking of nuclear plant system and component degradation is being investigated as a method for improving the safety, reliability, and maintainability of aging nuclear power plants. Accurate prediction of the current degradation state of system components and structures is important for accurate estimates of their remaining useful life (RUL). The correct quantification and propagation of both the measurement uncertainty and model uncertainty is necessary for quantifying the uncertainty of the RUL prediction. This research project developed and validated methods to perform RUL estimation throughout the lifecycle of plant components. Prognostic methods should seamlessly operate from beginning of component life (BOL) to end of component life (EOL). We term this "Lifecycle Prognostics." When a component is put into use, the only information available may be past failure times of similar components used in similar conditions, and the predicted failure distribution can be estimated with reliability methods such as Weibull Analysis (Type I Prognostics). As the component operates, it begins to degrade and consume its available life. This life consumption may be a function of system stresses, and the failure distribution should be updated to account for the system operational stress levels (Type II Prognostics). When degradation becomes apparent, this information can be used to again improve the RUL estimate (Type III Prognostics). This research focused on developing prognostics algorithms for the three types of prognostics, developing uncertainty quantification methods for each of the algorithms, and, most importantly, developing a framework using Bayesian methods to transition between prognostic model types and update failure distribution estimates as new information becomes available. The developed methods were then validated on a range of accelerated degradation test beds. The ultimate goal of prognostics is to provide an accurate assessment for RUL predictions, with as little uncertainty as possible. From a reliability and maintenance standpoint, there would be improved safety by avoiding all failures. Calculated risk would decrease, saving money by avoiding unnecessary maintenance. One major bottleneck for data-driven prognostics is the availability of run-to-failure degradation data. Without enough degradation data leading to failure, prognostic models can yield RUL distributions with large uncertainty or mathematically unsound predictions. To address these issues a "Lifecycle Prognostics" method was developed to create RUL distributions from Beginning of Life (BOL) to End of Life (EOL). This employs established Type I, II, and III prognostic methods, and Bayesian transitioning between each Type. Bayesian methods, as opposed to classical frequency statistics, show how an expected value, a priori, changes with new data to form a posterior distribution. For example, when you purchase a component you have a prior belief, or estimation, of how long it will operate before failing. As you operate it, you may collect information related to its condition that will allow you to update your estimated failure time. Bayesian methods are best used when limited data are available. The use of a prior also means that information is conserved when new data are available. The weightings of the prior belief and information contained in the sampled data are dependent on the variance (uncertainty) of the prior, the variance (uncertainty) of the data, and the amount of measured data (number of samples). If the variance of the prior is small compared to the uncertainty of the data, the prior will be weighed more heavily. However, as more data are collected, the data will be weighted more heavily and will eventually swamp out the prior in calculating the posterior distribution of model parameters. Fundamentally Bayesian analysis updates a prior belief with new data to get a posterior belief. The general approach to applying the Bayesian method to lifecycle prognostics consisted of identifying the prior, which is the RUL es

  10. A computerized main control room for NPP: Development and investigation

    SciTech Connect (OSTI)

    Anokhin, A. N.; Marshall, E. C.; Rakitin, I. D.; Slonimsky, V. M.

    2006-07-01

    An ergonomics assessment of the control room at Leningrad Nuclear Power Plant has been undertaken as part of an international project funded by the EU TACIS program. The project was focused on the upgrading of the existing control facilities and the installation of a validation facility to evaluate candidate refurbishment proposals before their implementation at the plant. The ergonomics methodology applied in the investigation was wide ranging and included an analysis of reported events, extensive task analysis (including novel techniques) and validation studies using experienced operators. The paper addresses the potential difficulties for the human operator associated with fully computerized interfaces and shows how the validation facility and the outcomes from ergonomics assessment will be used to minimise any adverse impact on performance that may be caused by proposed control room changes. (authors)

  11. PV Validation and Bankability Workshop: San Jose, California

    SciTech Connect (OSTI)

    Granata, J.; Howard, J.

    2011-12-01

    This report is a collaboration between Sandia National Laboratories, the National Renewable Energy Laboratory, and the Florida Solar Energy Center (FSEC). The report provides feedback from the U.S. Department of Energy's (DOE) Solar Program PV Validation and Bankability Workshop in San Jose, California on August 31, 2011. It focuses on the current state of PV in the United States, private funding to fund U.S. PV industry growth, roles and functions of the regional test center program, and ways to improve the current validation and bankability practices.

  12. Social Media and Social Reality - Theory, Evidence and Validation

    SciTech Connect (OSTI)

    Reynolds, William; Weber, Marta S.; Farber, Robert M.; Corley, Courtney D.; Cowell, Andrew J.; Gregory, Michelle L.

    2010-06-14

    Social Media provide an exciting and novel view into social phenomena. The vast amounts of data that can be gathered from the Internet coupled with massively parallel supercomputers such as the Cray XMT open new vistas for research. Conclusions drawn from such analysis must recognize that social media are distinct from the underlying social reality. Rigorous validation is essential. This paper briefly presents results obtained from computational analysis of social media - utilizing both blog and twitter data. Validation of these results is discussed in the context of a framework of established methodologies from the social sciences. Finally, an outline for a set of supporting studies is proposed.

  13. CASL - Validation of Peregrine with Test Reactor Data

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsiclouddenDVA N C E D B L OBransenBusinessInitial Validation andpressurizedValidation of

  14. Controlling Fleas 

    E-Print Network [OSTI]

    Merchant, Michael E.; Robinson, James V.

    2006-12-18

    . For this reason, avoid close contact with wild rodents such as squirrels, rats and prairie dogs. Their fleas can bite you and may transmit disease. Cat fleas, however, do not carry plague. Control An integrated flea control program includes good sanitation... and treatment of the pet and environment. You can eliminate fleas from your home with proper treatment, but it may take time, especially if the infes- tation is heavy. Sanitation. Change pet bedding regularly and vacuum thoroughly. Vacuuming removes up to 30...

  15. Wind-driven Sediment Suspension Controls Light Availability in a Shallow Coastal Lagoon

    E-Print Network [OSTI]

    McGlathery, Karen

    Wind-driven Sediment Suspension Controls Light Availability in a Shallow Coastal Lagoon S. E, was determined for a summer and late fall time period with different wind conditions. We combined field and currents in Hog Island Bay responded strongly to wind forcing, with bottom stresses from wind driven waves

  16. University of Nevada Las Vegas Arduino Project Report: Fan Speed Control as a Function of Thermistor

    E-Print Network [OSTI]

    Kachroo, Pushkin

    University of Nevada Las Vegas Arduino Project Report: Fan Speed Control as a Function, and an arduino board. The arduino board is programmed to read the analog input, the thermistor, and respond by the arduino that will decrease the speed of the fan. Furthermore, if the temperature goes up, the resistance

  17. Control Methodologies for a Heterogeneous Group of Untethered Magnetic Micro-Robots

    E-Print Network [OSTI]

    Sitti, Metin

    investigate Mag-µBots that are geometrically and magnetically designed to respond uniquely to the same input magnetic fields. Designs include: (1) ge- ometrically similar Mag-µBots with different values of magControl Methodologies for a Heterogeneous Group of Untethered Magnetic Micro-Robots Steven Floyd

  18. Implementation of CMOS Neuron for Robot Motion Control Unit , Jing Yang1

    E-Print Network [OSTI]

    Ayers, Joseph

    ]), engineered muscle which is activated by oLED circuit, and powered by thin film battery, all of which control unit to generate corresponding motion patterns. The motion patterns are then transferred by oLED circuit and the optogenetically engineered muscles that respond to light will produce an undulatory

  19. Design, fabrication, and control of soft robots with fluidic elastomer actuators

    E-Print Network [OSTI]

    Marchese, Andrew D. (Andrew Dominic)

    2015-01-01

    The goal of this thesis is to explore how autonomous robotic systems can be created with soft elastomer bodies powered by fluids. In this thesis we innovate in the design, fabrication, control, and experimental validation ...

  20. ASME Symposium on Modeling and Control Electrohydraulic Systems, Orlando, FL. November, 2000

    E-Print Network [OSTI]

    Li, Perry Y.

    ASME Symposium on Modeling and Control Electrohydraulic Systems, Orlando, FL. November, 2000 1 not present in previous models. The model has been coded in Simulink and experimentally validated. I

  1. A Control Scheme of Enhanced Reliability for Multiple Chiller Plants Using Mergerd Building Cooling Load Measurements 

    E-Print Network [OSTI]

    Wang, S.; Sun, Y.; Huang, G.; Zhu, N.

    2008-01-01

    the cooling load using chiller models based on the instantaneous chiller electrical power input and condition measured variables. The control performance of the proposed scheme is validated in this paper....

  2. Validation of Innovative Exploration Technologies for Newberry Volcano: LIDAR of Newberry Volcano 2012

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Jaffe, Todd

    2012-01-01

    Validation of Innovative Exploration Technologies for Newberry Volcano: LIDAR of Newberry Volcano 2012

  3. Validation of Innovative Exploration Technologies for Newberry Volcano: LIDAR of Newberry Volcano 2012

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Jaffe, Todd

    Validation of Innovative Exploration Technologies for Newberry Volcano: LIDAR of Newberry Volcano 2012

  4. Validation of Hydrogen Fuel Cell Vehicle and Infrastructure Technology (Fact Sheet)

    Broader source: Energy.gov [DOE]

    Fact sheet on Validation of Hydrogen Fuel Cell Vehicle and Infrastructure Technology activities at NREL.

  5. Validation Procedure of the Tokamak Equilibrium Reconstruction Code EQUAL with a Scientific Workflow System

    E-Print Network [OSTI]

    Validation Procedure of the Tokamak Equilibrium Reconstruction Code EQUAL with a Scientific Workflow System

  6. Sequence Assembly Validation by Multiple Restriction Digest Fragment Coverage Analysis

    E-Print Network [OSTI]

    Rouchka, Eric

    Sequence Assembly Validation by Multiple Restriction Digest Fragment Coverage Analysis Eric C the possibility of analyzing multiple, independent restriction digests as a method for testing the fidelity of the fragment assembly is highly desirable. Comparison of predicted and experimental restriction digests has

  7. Press Tonnage Signal Decomposition and Validation Analysis for

    E-Print Network [OSTI]

    Jin, Jionghua "Judy"

    Press Tonnage Signal Decomposition and Validation Analysis for Transfer or Progressive Die to de- velop a new methodology that can decompose press tonnage sig- nals to obtain individual station consists of multiple die stations, the press tonnage signals measured from the press linkages

  8. NEAMS Experimental Support for Code Validation, INL FY2009

    SciTech Connect (OSTI)

    G. Youinou; G. Palmiotti; M. Salvatore; C. Rabiti

    2009-09-01

    The goal is for all modeling and simulation tools to be demonstrated accurate and reliable through a formal Verification and Validation (V&V) process, especially where such tools are to be used to establish safety margins and support regulatory compliance, or to design a system in a manner that reduces the role of expensive mockups and prototypes. Whereas the Verification part of the process does not rely on experiment, the Validation part, on the contrary, necessitates as many relevant and precise experimental data as possible to make sure the models reproduce reality as closely as possible. Hence, this report presents a limited selection of experimental data that could be used to validate the codes devoted mainly to Fast Neutron Reactor calculations in the US. Emphasis has been put on existing data for thermal-hydraulics, fuel and reactor physics. The principles of a new “smart” experiment that could be used to improve our knowledge of neutron cross-sections are presented as well. In short, it consists in irradiating a few milligrams of actinides and analyzing the results with Accelerator Mass Spectroscopy to infer the neutron cross-sections. Finally, the wealth of experimental data relevant to Fast Neutron Reactors in the US should not be taken for granted and efforts should be put on saving these 30-40 years old data and on making sure they are validation-worthy, i.e. that the experimental conditions and uncertainties are well documented.

  9. Validation of Eddy-renewal model by numerical simulation

    E-Print Network [OSTI]

    Garbe, Christoph S.

    Validation of Eddy-renewal model by numerical simulation Li-Ping Hung1,2 , Christoph S. Garbe1, E-mail: wttsai@ncu.edu.tw Abstract. The eddy-renewal model proposes that the dominant vortical flows as the diffusivity effect in the thin diffusive sublayer beneath surface. Key Words: eddy-renewal model, numerical

  10. Validation of Innovative Exploration Technologies for Newberry Volcano

    Broader source: Energy.gov [DOE]

    DOE Geothermal Technologies Peer Review - 2010. Project summary: To effectively combine numerous exploration technologies to gather important data. Once information is combined into 3-D models, a target drilling location will be determined. Deep well capable of finding commercial quantities of geothermal resource will be drilled to validate methodology.

  11. Risk Analytics for Estimating and Validating Magnitude of Earthquake Losses

    E-Print Network [OSTI]

    Rau-Chaplin, Andrew

    Risk Analytics for Estimating and Validating Magnitude of Earthquake Losses A. Astoul, C. Filliter-time estimation and visualisation of insured losses incurred due to earthquakes is presented. The system incorporates a model for estimating losses due to earthquakes in near real-time and a geo

  12. Utilization of a Validated Power System Model on Two

    E-Print Network [OSTI]

    Utilization of a Validated Power System Model on Two Scenarios: Base Case and High Wind Penetration. DE-FC-06NT42847 Task 1. Deliverable #4 ­ Conceptual Design Report By GE Global Research Niskayuna-956-8346 e-mail: rochelea@hawaii.edu Technical Contact at GE Global Research: Devon Manz Electric Power

  13. SPATIOTEMPORAL SEGMENTATION FOR VALIDATION OF ROLLING LEUKOCYTE TRACKING DATA

    E-Print Network [OSTI]

    Acton, Scott

    leukocytes (activated white blood cells moving significantly slower than the blood flow) is a critical tool by employing an edge-response filter followed by an active contour method. The proposed direction sensitive such values within a range of orientations of the line segment. Our validation experiments show

  14. Investigating primary breakup with OpenFoam: Performance and Validation

    E-Print Network [OSTI]

    Technologies · Biomass, wind, nuclear, solar · Smart engines, prognostics and CBM · Diesels, HCCI, turbos ­ Validation ­ Exploration #12;3 / GE ORNL visit / 10/29/2010 · Aero acoustics ... Fan, Wind, jet & other­ Menard et al, 2007 (VOF+Levelset) [11] Large Eddy Simulation of Primary Diesel Spray Atomization (VOF

  15. Preliminary Validation and Performance of the Jason Microwave Radiometer

    E-Print Network [OSTI]

    Ruf, Christopher

    Preliminary Validation and Performance of the Jason Microwave Radiometer Shannon Brown and Chris Pasadena, CA Abstract ­ The Jason Microwave Radiometer is calibrated using hot and cold on-located Topex Microwave Radiometer and radiosonde values. The calibrated path delay values are demonstrated

  16. Guide to Using the WIND Toolkit Validation Code

    SciTech Connect (OSTI)

    Lieberman-Cribbin, W.; Draxl, C.; Clifton, A.

    2014-12-01

    In response to the U.S. Department of Energy's goal of using 20% wind energy by 2030, the Wind Integration National Dataset (WIND) Toolkit was created to provide information on wind speed, wind direction, temperature, surface air pressure, and air density on more than 126,000 locations across the United States from 2007 to 2013. The numerical weather prediction model output, gridded at 2-km and at a 5-minute resolution, was further converted to detail the wind power production time series of existing and potential wind facility sites. For users of the dataset it is important that the information presented in the WIND Toolkit is accurate and that errors are known, as then corrective steps can be taken. Therefore, we provide validation code written in R that will be made public to provide users with tools to validate data of their own locations. Validation is based on statistical analyses of wind speed, using error metrics such as bias, root-mean-square error, centered root-mean-square error, mean absolute error, and percent error. Plots of diurnal cycles, annual cycles, wind roses, histograms of wind speed, and quantile-quantile plots are created to visualize how well observational data compares to model data. Ideally, validation will confirm beneficial locations to utilize wind energy and encourage regional wind integration studies using the WIND Toolkit.

  17. Formal definition of POTENTIAL ENERGY (valid for conservative forces only)

    E-Print Network [OSTI]

    some kinetic energy as well as some potential energy change along the way. Question: What doespage - 16 Formal definition of POTENTIAL ENERGY (valid for conservative forces only) Given one type of conservative force F UB - UA= - = - Definition of 'Potential energy difference" conserv #12;page - 17

  18. PicoDBMS: Validation and Experience Nicolas Anciaux*

    E-Print Network [OSTI]

    Bouganim, Luc

    1 PicoDBMS: Validation and Experience Nicolas Anciaux* , Christophe Bobineau* , Luc Bouganim a DBMS is undoubtedly the best candidate to host data in a highly-available and secure way. This makes of popular DBMS (e.g., Oracle 8i Lite, DB2 Everywhere) have been designed for portable computers and PDA

  19. Direct Methanol Fuel Cell Experimental and Model Validation Study

    E-Print Network [OSTI]

    Wang, Chao-Yang

    Direct Methanol Fuel Cell Experimental and Model Validation Study M. Mench, J. Scott, S. Thynell boundary Fuel cell performance Current density distribution measurements Conclusions #12;3 Method, flow rate, species inlet and fuel cell temperature, and humidity. Transparent polycarbonate windows

  20. Into the Loops: Practical Issues in Translation Validation for

    E-Print Network [OSTI]

    Barrett, Clark W.

    optimizations employed by Intel's ORC compiler. Tvoc, however, is somewhat limited when dealing with loop ORC, this instrumentation is fortu- nately part of the compiler). This paper addresses all the issues by the Intel ORC compiler, describes a methodology for translation validation in the presence of combinations

  1. Validity and Reliability of Web Accessibility Guidelines Giorgio Brajnik

    E-Print Network [OSTI]

    Brajnik, Giorgio

    checkpoints taken from WCAG 1.0 and WCAG 2.0. The experiment employed 35 young web developers with some the viewpoint of their validity and reliability. WCAG 2.0 explicitly claim that they are based on "testable knowledge on web accessibility. Although this is a small-scale experiment, unlikely to provide definite

  2. Utilization of a Validated Power System Model on Two

    E-Print Network [OSTI]

    Utilization of a Validated Power System Model on Two Scenarios: Base Case and High Wind Penetration, New York And University of Hawaii Hawaii Natural Energy Institute School of Ocean and Earth Science are presented. The business-as-usual and higher wind penetration scenarios have been built in both

  3. Additional critical experiments for computer code validation base

    SciTech Connect (OSTI)

    Elliott, E.P.; Tollefson, D.A.; Vornehm, R.G.

    1994-04-25

    This paper describes the validation, in accordance with ANSI/ANS-8.1-1983(R1988), of KENO V.a using the 27-group ENDF/B-IV cross section library for some neutronic systems containing highly-enriched uranium, carbon, and hydrogen. This constituent combination is present in many packaging applications for the safe transportation of fissile and fissionable materials. The validation has been performed for two separate computational platforms: an IBM 3090 mainframe and an HP 9000 Series 700 workstation, both using the Oak Ridge Y-12 Plant Nuclear Criticality Safety Software (NCSS) code package. Critical experiments performed at the Oak Ridge Critical Experiments Facility in support of the Rover reactor program were identified as having the constitutents desired for this validation as well as sufficient experimental detail to allow accurate construction of KENO V.a calculational models. Calculated values of k{sub eff} for the Rover experiments, which contain uranium, carbon, and hydrogen, are between 1.0012 {+-} 0.0026 and 1.0245 {+-} 0.0023. These experiments can now be added to KENO V.a and other computer code critical experiment data bases which are used for validation and to establish upper limits on calculated values of k{sub eff} for specific applications.

  4. Validating the Evaluation of Adaptive Systems by User Profile Simulation

    E-Print Network [OSTI]

    Bravo, Javier

    a simulation-based technique is proposed as an economic way for testing evaluation tools based on log analysisValidating the Evaluation of Adaptive Systems by User Profile Simulation Javier Bravo and Alvaro.ortigosa}@uam.es Abstract. Availability of automated tools and methods to evaluate adaptive systems is a fundamental

  5. Procurement Auction with Supplier Coalitions: Validity Requirements and Mechanism Design

    E-Print Network [OSTI]

    Wu, David

    1 Procurement Auction with Supplier Coalitions: Validity Requirements and Mechanism Design Mingzhou of Engineering, Lehigh University Abstract: We study the formation of supplier coalitions in the context propose a two-stage auction mechanism that allows suppliers to form coalitions with one another. Building

  6. Design of Embedded Systems: Formal Models, Validation, and Synthesis

    E-Print Network [OSTI]

    Grosu, Radu

    critical situations, where reliability and safety are more important criteria than performance. TodayDesign of Embedded Systems: Formal Models, Validation, and Synthesis S. Edwards, L. Lavagno, E. A. Lee, and A. Sangiovanni-Vincentelli November 5, 1999 Abstract This paper addresses the design

  7. Validation of FSP Reactor Design with Sensitivity Studies of Beryllium-Reflected Critical Assemblies

    SciTech Connect (OSTI)

    John D. Bess; Margaret A. Marshall

    2013-02-01

    The baseline design for space nuclear power is a fission surface power (FSP) system: sodium-potassium (NaK) cooled, fast spectrum reactor with highly-enriched-uranium (HEU)-O2 fuel, stainless steel (SS) cladding, and beryllium reflectors with B4C control drums. Previous studies were performed to evaluate modeling capabilities and quantify uncertainties and biases associated with analysis methods and nuclear data. Comparison of Zero Power Plutonium Reactor (ZPPR)-20 benchmark experiments with the FSP design indicated that further reduction of the total design model uncertainty requires the reduction in uncertainties pertaining to beryllium and uranium cross-section data. Further comparison with three beryllium-reflected HEU-metal benchmark experiments performed at the Oak Ridge Critical Experiments Facility (ORCEF) concluded the requirement that experimental validation data have similar cross section sensitivities to those found in the FSP design. A series of critical experiments was performed at ORCEF in the 1960s to support the Medium Power Reactor Experiment (MPRE) space reactor design. The small, compact critical assembly (SCCA) experiments were graphite- or beryllium-reflected assemblies of SS-clad, HEU-O2 fuel on a vertical lift machine. All five configurations were evaluated as benchmarks. Two of the five configurations were beryllium reflected, and further evaluated using the sensitivity and uncertainty analysis capabilities of SCALE 6.1. Validation of the example FSP design model was successful in reducing the primary uncertainty constituent, the Be(n,n) reaction, from 0.28 %dk/k to 0.0004 %dk/k. Further assessment of additional reactor physics measurements performed on the SCCA experiments may serve to further validate FSP design and operation.

  8. Environmental Control Technology

    SciTech Connect (OSTI)

    NONE

    1997-02-10

    Operations and maintenance continued this month at the Electric Power Research Institute's (EPRI's) Environmental Control Technology Center (ECTC). Testing for the Hazardous Air Pollutants (HAP) study was conducted using the Carbon Injection System (the 4.0 MW Spray Dryer Absorber and the Pulse-Jet Fabric Filter). Testing also continued across the B&W/CHX Heat Exchanger this month as the effects of increased particulate loading are being studied. The 1.0 MW Cold-Side Selective Catalytic Reduction (SCR) unit and the 4.0 MW Pilot Wet Scrubber remained idle this month in a cold-standby mode and were inspected regularly. On September 13, 1996, the ECTC completed an independent test block for a third-party company, Air Purification Inc. (API). For this testing, the ECTC's staff (O&M and Testing) were contracted to conduct performance and validation testing across a new, integrated emissions control device, the Rotorfilter{trademark}. This testing was conducted for a thirty (30) day period simultaneously with the B&W/CHX test block. The HAP testing resumed as this third-party test block was completed. Testing in September at the Electric Power Research Institute's (EPRI's) Environmental Control Technology Center (ECTC) included tests from the Pilot Trace Elements Removal (TER) test block as part of EPRI's overall program to develop control technology options for reduction of trace element emissions. This experimental program investigates mercury removal and mercury speciation under different operating conditions. The 1996 program is being performed on the 4.0 MW wet FGD pilot unit and the spray dryer/pulse jet fabric filter (SDA/PJFF) pilot units. The 1996 Trace Elements Removal (TER) test block is a continuation of the 1995 TER test block and will focus on up to five research areas, depending on experimental results. These areas are: (1) Mercury speciation methods; (2) Effect of FGD system operating variables on mercury removal; (3) Novel methods for elemental mercury control; (4) Catalytic methods for converting elemental mercury to oxidized mercury; and (5) Electrostatic charging of particulate material in the FGD inlet flue gas stream.

  9. Validation of Criticality Safety Calculations with SCALE 6.2

    SciTech Connect (OSTI)

    Marshall, William BJ J [ORNL] [ORNL; Wiarda, Dorothea [ORNL] [ORNL; Celik, Cihangir [ORNL] [ORNL; Rearden, Bradley T [ORNL] [ORNL

    2013-01-01

    SCALE 6.2 provides numerous updates in nuclear data, nuclear data processing, and computational tools utilized in the criticality safety calculational sequences relative to SCALE 6.1. A new 252-group ENDF/B-VII.0 multigroup neutron library, improved ENDF/B-VII.0 continuous energy data, as well as the previously deployed 238-group ENDF/B-VII.0 neutron library are included in SCALE 6.2 for criticality safety analysis. The performance of all three libraries for keff calculations is examined with a broad sampling of critical experiment models covering a range of fuels and moderators. Critical experiments from the International Handbook of Evaluated Criticality Safety Benchmark Experiments (IHECSBE) that are available in the SCALE Verified, Archived Library of Inputs and Data (VALID) are used in this validation effort. Over 300 cases are used in the validation of KENO V.a, and a more limited set of approximately 50 configurations are used for KENO-VI validation. Additionally, some KENO V.a cases are converted to KENO-VI models so that an equivalent set of experiments can be used to validate both codes. For continuous-energy calculations, SCALE 6.2 provides improved performance relative to SCALE 6.1 in most areas with notable improvements in fuel pin lattice cases, particularly those with mixed oxide fuel. Multigroup calculations with the 252-group library also demonstrate improved performance for fuel lattices, uranium (high and intermediate enrichment) and plutonium metal experiments, and plutonium solution systems. Overall, SCALE 6.2 provides equivalent or smaller biases than SCALE 6.1, and the two versions of KENO provide similar results on the same suite of problems.

  10. Post-processing of seismic parameter data based on valid seismic event determination

    DOE Patents [OSTI]

    McEvilly, Thomas V. (733 Alvarado Rd., Berkeley, CA 94705)

    1985-01-01

    An automated seismic processing system and method are disclosed, including an array of CMOS microprocessors for unattended battery-powered processing of a multi-station network. According to a characterizing feature of the invention, each channel of the network is independently operable to automatically detect, measure times and amplitudes, and compute and fit Fast Fourier transforms (FFT's) for both P- and S- waves on analog seismic data after it has been sampled at a given rate. The measured parameter data from each channel are then reviewed for event validity by a central controlling microprocessor and if determined by preset criteria to constitute a valid event, the parameter data are passed to an analysis computer for calculation of hypocenter location, running b-values, source parameters, event count, P- wave polarities, moment-tensor inversion, and Vp/Vs ratios. The in-field real-time analysis of data maximizes the efficiency of microearthquake surveys allowing flexibility in experimental procedures, with a minimum of traditional labor-intensive postprocessing. A unique consequence of the system is that none of the original data (i.e., the sensor analog output signals) are necessarily saved after computation, but rather, the numerical parameters generated by the automatic analysis are the sole output of the automated seismic processor.

  11. Validation of the Monte Carlo Criticality Program KENO V. a for highly-enriched uranium systems

    SciTech Connect (OSTI)

    Knight, J.R.

    1984-11-01

    A series of calculations based on critical experiments have been performed using the KENO V.a Monte Carlo Criticality Program for the purpose of validating KENO V.a for use in evaluating Y-12 Plant criticality problems. The experiments were reflected and unreflected systems of single units and arrays containing highly enriched uranium metal or uranium compounds. Various geometrical shapes were used in the experiments. The SCALE control module CSAS25 with the 27-group ENDF/B-4 cross-section library was used to perform the calculations. Some of the experiments were also calculated using the 16-group Hansen-Roach Library. Results are presented in a series of tables and discussed. Results show that the criteria established for the safe application of the KENO IV program may also be used for KENO V.a results.

  12. SCALE Code Validation for Prismatic High-Temperature Gas-Cooled Reactors

    SciTech Connect (OSTI)

    Ilas, Dan [ORNL

    2013-01-01

    Using experimental data published in the International Handbook of Evaluated Reactor Physics Benchmark Experiments for the fresh cold core of the High Temperature Engineering Test Reactor, a comprehensive validation study has been carried out to assess the performance of the SCALE code system for analysis of high-temperature gas-cooled reactor configurations. This paper describes part of the results of that effort. The studies performed included criticality evaluations for the full core and for the annular cores realized during the fuel loading, as well as calculations and comparisons for excess reactivity, shutdown margin, control rod worths, temperature coefficient of reactivity, and reaction rate distributions. Comparisons of the SCALE results with both experimental values and MCNP-calculated values are presented. The comparisons show that the SCALE calculated results, obtained with both multigroup and continuous energy cross sections, are in reasonable agreement with the experimental data and the MCNP predictions.

  13. SCALE Code Validation for Prismatic High-Temperature Gas-Cooled Reactors

    SciTech Connect (OSTI)

    Ilas, Dan [ORNL] [ORNL

    2012-01-01

    Using experimental data published in the International Handbook of Evaluated Reactor Physics Benchmark Experiments for the fresh cold core of the High Temperature Engineering Test Reactor, a comprehensive validation study has been carried out to assess the performance of the SCALE code system for analysis of High Temperature Gas-Cooled Reactor (HTGR) configurations. This paper describes part of the results of this effort. The studies performed included criticality evaluations for the full core and for the annular cores realized during the fuel loading, as well as calculations and comparisons for excess reactivity, shutdown margin, control rod worths, temperature coefficient of reactivity, and reaction rate distributions. Comparisons of the SCALE results with both the experimental values and MCNP-calculated values are presented. The comparisons show that the SCALE calculated results, obtained with both multigroup and continuous energy cross sections, are in reasonable agreement with the experimental data. The agreement with the MCNP predictions is, in general, very good.

  14. Modeling Framework and Validation of a Smart Grid and Demand Response System for Wind Power Integration

    SciTech Connect (OSTI)

    Broeer, Torsten; Fuller, Jason C.; Tuffner, Francis K.; Chassin, David P.; Djilali, Ned

    2014-01-31

    Electricity generation from wind power and other renewable energy sources is increasing, and their variability introduces new challenges to the power system. The emergence of smart grid technologies in recent years has seen a paradigm shift in redefining the electrical system of the future, in which controlled response of the demand side is used to balance fluctuations and intermittencies from the generation side. This paper presents a modeling framework for an integrated electricity system where loads become an additional resource. The agent-based model represents a smart grid power system integrating generators, transmission, distribution, loads and market. The model incorporates generator and load controllers, allowing suppliers and demanders to bid into a Real-Time Pricing (RTP) electricity market. The modeling framework is applied to represent a physical demonstration project conducted on the Olympic Peninsula, Washington, USA, and validation simulations are performed using actual dynamic data. Wind power is then introduced into the power generation mix illustrating the potential of demand response to mitigate the impact of wind power variability, primarily through thermostatically controlled loads. The results also indicate that effective implementation of Demand Response (DR) to assist integration of variable renewable energy resources requires a diversity of loads to ensure functionality of the overall system.

  15. Stormwater Control Structures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stormwater Control Structures Stormwater Control Structures Stormwater control structures are engineered to control run-on and runoff water from suspected contaminated sites....

  16. Validation of nuclear models used in space radiation shielding applications

    SciTech Connect (OSTI)

    Norman, Ryan B.; Blattnig, Steve R.

    2013-01-15

    A program of verification and validation has been undertaken to assess the applicability of models to space radiation shielding applications and to track progress as these models are developed over time. In this work, simple validation metrics applicable to testing both model accuracy and consistency with experimental data are developed. The developed metrics treat experimental measurement uncertainty as an interval and are therefore applicable to cases in which epistemic uncertainty dominates the experimental data. To demonstrate the applicability of the metrics, nuclear physics models used by NASA for space radiation shielding applications are compared to an experimental database consisting of over 3600 experimental cross sections. A cumulative uncertainty metric is applied to the question of overall model accuracy, while a metric based on the median uncertainty is used to analyze the models from the perspective of model development by examining subsets of the model parameter space.

  17. Cross-platform validation and analysis environment for particle physics

    E-Print Network [OSTI]

    S. V. Chekanov; I. Pogrebnyak; D. Wilbern

    2015-10-20

    A multi-platform validation and analysis framework for public Monte Carlo simulation for high-energy particle collisions is discussed. The front-end of this framework uses the Python programming language, while the back-end is written in Java, which provides a multi-platform environment that can be run from a web browser and can easily be deployed at the grid sites. The analysis package includes all major software tools used in high-energy physics, such as Lorentz vectors, jet algorithms, histogram packages, graphic canvases, and tools for providing data access. This multi-platform software suite, designed to minimize OS-specific maintenance and deployment time, is used for online validation of Monte Carlo event samples through a web interface.

  18. Swing Check Valve Design Criteria and CFD Validation

    SciTech Connect (OSTI)

    Dallstream, Brian E.; Fricke, Brian A.; Becker, Bryan R. [University of Missouri-Kansas City (United States)

    2006-07-01

    This paper provides information on swing check valve selection criteria suitable for nuclear power plant applications. In this project, four swing check valves were analyzed to demonstrate the implementation and application of this information. In this example, swing check valves were selected according to 'ASME Boiler and Pressure Vessel Code, Section III' and 'ASME B16.34, Valves Flanged, Threaded, and Welding End'. This paper also discusses the utilization of Computational Fluid Dynamics Software (CFD) as a means to analyze valve design. The use of CFD is a relatively new approach for validation of valve design that is becoming invaluable due to the high cost of physical bench testing. The Instrument Society of America (ISA) Analysis Division and the American Society of Mechanical Engineers (ASME) Computational Fluid Dynamics Technical Committee have taken a proactive approach in setting standards and practices for the use of CFD in design and validation. (authors)

  19. Quantitative validation of PEDFLOW for description of unidirectional pedestrian dynamics

    E-Print Network [OSTI]

    Zhang, J; Chraibi, M; Loehner, R; Haug, E; Gawenat, B

    2015-01-01

    The results of a systematic quantitative validation of PEDFLOW based on the experimental data from FZJ are presented. Unidirectional flow experiments, totaling 28 different combinations with varying entry, corridor and exit widths, were considered. The condition imposed on PEDFLOW was that all the cases should be run with the same input parameters. The exit times and fundamental diagrams for the measuring region were evaluated and compared. This validation process led to modifications and enhancements of the model underlying PEDFLOW. The preliminary conclusions indicate that the results agree well for densities smaller than 3 m-2 and a good agreement is observed even at high densities for the corridors with bcor = 2.4 m, and bcor = 3.0 m. For densities between 1 and 2 m-2 the specific flow and velocities are underpredicted by PEDFLOW.

  20. Computational design and experimental validation of new thermal barrier systems

    SciTech Connect (OSTI)

    Guo, Shengmin

    2015-03-31

    The focus of this project is on the development of a reliable and efficient ab initio based computational high temperature material design method which can be used to assist the Thermal Barrier Coating (TBC) bond-coat and top-coat design. Experimental evaluations on the new TBCs are conducted to confirm the new TBCs’ properties. Southern University is the subcontractor on this project with a focus on the computational simulation method development. We have performed ab initio density functional theory (DFT) method and molecular dynamics simulation on screening the top coats and bond coats for gas turbine thermal barrier coating design and validation applications. For experimental validations, our focus is on the hot corrosion performance of different TBC systems. For example, for one of the top coatings studied, we examined the thermal stability of TaZr2.75O8 and confirmed it’s hot corrosion performance.

  1. ITOUGH2 V3.2 verification and validation report

    SciTech Connect (OSTI)

    Finsterle, S.

    1998-06-01

    This report describes the Verification and Validation (V and V) test cases performed to qualify ITOUGH2 V3.2. ITOUGH2 V3.2 was installed in a directory {approximately}/itough2v3.2 on a SUN ULTRA 1 workstation under UNIX Solaris 2. Instructions for installing ITOUGH2 can be found in file read.me and the user`s manual. This report is structured as follows: for each functional requirement, the corresponding design is described, which may include the mathematical model implemented in ITOUGH2 V3.2, if appropriate. Next, the author discusses the test case or sequence of test cases performed to validate each requirement, followed by a description of the test results and their compliance with the acceptance criteria. ITOUGH2 simulates fluid flow in fractures.

  2. Validation of HELIOS for ATR Core Follow Analyses

    SciTech Connect (OSTI)

    Bays, Samuel E.; Swain, Emily T.; Crawford, Douglas S.; Nigg, David W.

    2015-03-01

    This work summarizes the validation analyses for the HELIOS code to support core design and safety assurance calculations of the Advanced Test Reactor (ATR). Past and current core safety assurance is performed by the PDQ-7 diffusion code; a state of the art reactor physics simulation tool from the nuclear industry’s earlier days. Over the past twenty years, improvements in computational speed have enabled the use of modern neutron transport methodologies to replace the role of diffusion theory for simulation of complex systems, such as the ATR. More exact methodologies have enabled a paradigm-shift away from highly tuned codes that force compliance with a bounding safety envelope, and towards codes regularly validated against routine measurements. To validate HELIOS, the 16 ATR operational cycles from late-2009 to present were modeled. The computed power distribution was compared against data collected by the ATR’s on-line power surveillance system. It was found that the ATR’s lobe-powers could be determined with ±10% accuracy. Also, the ATR’s cold startup shim configuration for each of these 16 cycles was estimated and compared against the reported critical position from the reactor log-book. HELIOS successfully predicted criticality within the tolerance set by the ATR startup procedure for 13 out of the 16 cycles. This is compared to 12 times for PDQ (without empirical adjustment). These findings, as well as other insights discussed in this report, suggest that HELIOS is highly suited for replacing PDQ for core safety assurance of the ATR. Furthermore, a modern verification and validation framework has been established that allows reactor and fuel performance data to be computed with a known degree of accuracy and stated uncertainty.

  3. DOE Vehicle Technologies Program 2009 Merit Review Report - Technology Validation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based| Department8, 2015 GATEWAY Takes 9. Technology Validation Introduction In

  4. Validation of TES Temperature and Water Vapor Retrievals with ARM

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking WithTelecentric viewingValidating extended

  5. Validation of Innovative Exploration Technologies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematics And Statistics » USAJobs Search USAJobs SearchWater-SavingofCode |Department of18 -Validation of

  6. Validation of an Integrated Hydrogen Energy Station | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematics And Statistics » USAJobs Search USAJobs SearchWater-SavingofCode |Department of18 -Validation

  7. Fuel Cost Savings Through Computer Control of a Boiler Complex - - Two Case Histories 

    E-Print Network [OSTI]

    Worthley, C. M.

    1979-01-01

    meet the steam demand, the boiler must be able to respond SlIDOthly to load changes. '!his can be acxxxrplished by integrating steam pro duction control with air-to-fuel ratio, steam drum level and furnace draft control, as indicated in Fig. 1. When... to regulate steam prcx:1uction, not the base fuel flow. Since -chan~s in .oornbustion and steam prcx:1uction affect drum balance and indicated level measurement, the drum level control is coordinated with the steam production control. Feedwater flow...

  8. Automated Grid Disruption Response System: Robust Adaptive Topology Control (RATC)

    SciTech Connect (OSTI)

    2012-03-01

    GENI Project: The RATC research team is using topology control as a mechanism to improve system operations and manage disruptions within the electric grid. The grid is subject to interruption from cascading faults caused by extreme operating conditions, malicious external attacks, and intermittent electricity generation from renewable energy sources. The RATC system is capable of detecting, classifying, and responding to grid disturbances by reconfiguring the grid in order to maintain economically efficient operations while guaranteeing reliability. The RATC system would help prevent future power outages, which account for roughly $80 billion in losses for businesses and consumers each year. Minimizing the time it takes for the grid to respond to expensive interruptions will also make it easier to integrate intermittent renewable energy sources into the grid.

  9. Robust design and model validation of nonlinear compliant micromechanisms.

    SciTech Connect (OSTI)

    Howell, Larry L. (Brigham Young University, Provo, UT); Baker, Michael Sean; Wittwer, Jonathan W. (Brigham Young University, Provo, UT)

    2005-02-01

    Although the use of compliance or elastic flexibility in microelectromechanical systems (MEMS) helps eliminate friction, wear, and backlash, compliant MEMS are known to be sensitive to variations in material properties and feature geometry, resulting in large uncertainties in performance. This paper proposes an approach for design stage uncertainty analysis, model validation, and robust optimization of nonlinear MEMS to account for critical process uncertainties including residual stress, layer thicknesses, edge bias, and material stiffness. A fully compliant bistable micromechanism (FCBM) is used as an example, demonstrating that the approach can be used to handle complex devices involving nonlinear finite element models. The general shape of the force-displacement curve is validated by comparing the uncertainty predictions to measurements obtained from in situ force gauges. A robust design is presented, where simulations show that the estimated force variation at the point of interest may be reduced from {+-}47 {micro}N to {+-}3 {micro}N. The reduced sensitivity to process variations is experimentally validated by measuring the second stable position at multiple locations on a wafer.

  10. Validation and Comparison of One-Dimensional Graound Motion Methodologies

    SciTech Connect (OSTI)

    B. Darragh; W. Silva; N. Gregor

    2006-06-28

    Both point- and finite-source stochastic one-dimensional ground motion models, coupled to vertically propagating equivalent-linear shear-wave site response models are validated using an extensive set of strong motion data as part of the Yucca Mountain Project. The validation and comparison exercises are presented entirely in terms of 5% damped pseudo absolute response spectra. The study consists of a quantitative analyses involving modeling nineteen well-recorded earthquakes, M 5.6 to 7.4 at over 600 sites. The sites range in distance from about 1 to about 200 km in the western US (460 km for central-eastern US). In general, this validation demonstrates that the stochastic point- and finite-source models produce accurate predictions of strong ground motions over the range of 0 to 100 km and for magnitudes M 5.0 to 7.4. The stochastic finite-source model appears to be broadband, producing near zero bias from about 0.3 Hz (low frequency limit of the analyses) to the high frequency limit of the data (100 and 25 Hz for response and Fourier amplitude spectra, respectively).

  11. Validation of the U.S. NRC coupled code system TRITON/TRACE/PARCS with the special power excursion reactor test III (SPERT III)

    SciTech Connect (OSTI)

    Wang, R. C.; Xu, Y.; Downar, T.; Hudson, N.

    2012-07-01

    The Special Power Excursion Reactor Test III (SPERT III) was a series of reactivity insertion experiments conducted in the 1950's. This paper describes the validation of the U.S. NRC Coupled Code system TRITON/PARCS/TRACE to simulate reactivity insertion accidents (RIA) by using several of the SPERT III tests. The work here used the SPERT III E-core configuration tests in which the RIA was initiated by ejecting a control rod. The resulting super-prompt reactivity excursion and negative reactivity feedback produced the familiar bell shaped power increase and decrease. The energy deposition during such a power peak has important safety consequences and provides validation basis for core coupled multi-physics codes. The transients of five separate tests are used to benchmark the PARCS/TRACE coupled code. The models were thoroughly validated using the original experiment documentation. (authors)

  12. Designing visualization tools for a distributed control architecture

    E-Print Network [OSTI]

    Kortenkamp, David

    Designing visualization tools for a distributed control architecture David Kortenkamp Metrica Inc of visualization tools for debugging and validating dis- tributed autonomous systems. These tools will let as they debug their autonomous systems. Traditional software debugging tools are not designed for distributed au

  13. Control Theoretic Adaptive Monitoring Tools for the Android Platform

    E-Print Network [OSTI]

    Guirguis, Mina S. - Department of Computer Science, Texas State University

    Control Theoretic Adaptive Monitoring Tools for the Android Platform DAVID REYNOLDS Department the duty cycles of the monitors. Our models and results are validated on the Android platform through emulation and real implementation on the Nexus 7 tablet. I. INTRODUCTION Motivation: The Android platform

  14. Finance & Administration Controller's Office

    E-Print Network [OSTI]

    Weston, Ken

    Finance & Administration Controller's Office April 2014 Michael Williams Controller Controller ICOFA 61318 Revised: 4/4/2014 #12;Finance & Administration Controller's Office Accounting & Asset Coordinator Property Surplus Sales 81269 Revised: 4/4/2014 #12;Finance & Administration Controller's Office

  15. Extending quantum control of time-independent systems to time-dependent systems

    E-Print Network [OSTI]

    Zhen-Yu Wang; Ren-Bao Liu

    2011-01-27

    We establish that if a scheme can control a time-independent system arbitrarily coupled to a generic finite bath over a short period of time $T$ with control precision $O(T^{N+1})$, it can also realize the control with the same order of precision on smoothly time-dependent systems. This result extends the validity of various universal dynamical control schemes to arbitrary analytically time-dependent systems.

  16. Software Verification & Validation Report for the 244-AR Vault Interim Stabilization Ventilation System

    SciTech Connect (OSTI)

    YEH, T.

    2002-11-20

    This document reports on the analysis, testing and conclusions of the software verification and validation for the 244-AR Vault Interim Stabilization ventilation system. Automation control system will use the Allen-Bradley software tools for programming and programmable logic controller (PLC) configuration. The 244-AR Interim Stabilization Ventilation System will be used to control the release of radioactive particles to the environment in the containment tent, located inside the canyon of the 244-AR facility, and to assist the waste stabilization efforts. The HVAC equipment, ducts, instruments, PLC hardware, the ladder logic executable software (documented code), and message display terminal are considered part of the temporary ventilation system. The system consists of a supply air skid, temporary ductwork (to distribute airflow), and two skid-mounted, 500-cfm exhausters connected to the east filter building and the vessel vent system. The Interim Stabilization Ventilation System is a temporary, portable ventilation system consisting of supply side and exhaust side. Air is supplied to the containment tent from an air supply skid. This skid contains a constant speed fan, a pre-filter, an electric heating coil, a cooling coil, and a constant flow device (CFD). The CFD uses a passive component that allows a constant flow of air to pass through the device. Air is drawn out of the containment tent, cells, and tanks by two 500-cfm exhauster skids running in parallel. These skids are equipped with fans, filters, stack, stack monitoring instrumentation, and a PLC for control. The 500CFM exhaust skids were fabricated and tested previously for saltwell pumping activities. The objective of the temporary ventilation system is to maintain a higher pressure to the containment tent, relative to the canyon and cell areas, to prevent contaminants from reaching the containment tent.

  17. CLARIFICATION AND VALIDATION OF NEED FOR EDUCATIONAL/INFORMATIONAL MATERIALS TO

    E-Print Network [OSTI]

    CLARIFICATION AND VALIDATION OF NEED FOR EDUCATIONAL/INFORMATIONAL MATERIALS TO SUPPORT Center for Homeland Security Clarification and Validation of Need for Educational/Informational Materials .............................................................................................................................................. 2 Review of Web Resources

  18. Validation of a group 24-hour recall method for dietary assessment 

    E-Print Network [OSTI]

    Scott, Amanda Renee

    2002-01-01

    A group 24-hour recall method developed by the Expanded Food and Nutrition Education Program of Texas was validated in a population of low-income female food service workers using unobtrusive meal observation as a validation standard. All subjects...

  19. An Examination of the Predictive Validity of Curriculum-Embedded Measures for Kindergarten Students 

    E-Print Network [OSTI]

    Oslund, Eric

    2012-10-19

    The purpose of the present research was to examine the predictive validity of curriculum-embedded mastery-check measures (CEMs) for kindergarten students in Tier 2 intervention. Two studies examined the predictive validity, parsimony, and changing...

  20. Development and Validation of a Two-phase, Three-dimensional...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Validation of a Two-phase, Three-dimensional Model for PEM Fuel Cells Development and Validation of a Two-phase, Three-dimensional Model for PEM Fuel Cells Presented at the...

  1. T-676: Apple iOS Certificate Chain Validation Flaw Lets Certain...

    Energy Savers [EERE]

    676: Apple iOS Certificate Chain Validation Flaw Lets Certain Remote Users Access or Modify SSLTLS Sessions T-676: Apple iOS Certificate Chain Validation Flaw Lets Certain Remote...

  2. V-168: Splunk Web Input Validation Flaw Permits Cross-Site Scripting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    68: Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks V-168: Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks May 31, 2013 - 6:00am Addthis...

  3. SIMULATION AND VALIDATION OF HYBRID GROUND SOURCE AND WATER-LOOP HEAT PUMP

    E-Print Network [OSTI]

    SIMULATION AND VALIDATION OF HYBRID GROUND SOURCE AND WATER-LOOP HEAT PUMP SYSTEMS By JASON EARL AND VALIDATION OF HYBRID GROUND SOURCE AND WATER-LOOP HEAT PUMP SYSTEMS Thesis Approved: Dr. Jeffrey D. Spitler

  4. V-168: Splunk Web Input Validation Flaw Permits Cross-Site Scripting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks V-168: Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks May 31, 2013 - 6:00am Addthis...

  5. V-229: IBM Lotus iNotes Input Validation Flaws Permit Cross-Site...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: IBM Lotus iNotes Input Validation Flaws Permit Cross-Site Scripting Attacks V-229: IBM Lotus iNotes Input Validation Flaws Permit Cross-Site Scripting Attacks August 28, 2013 -...

  6. A VU governance process applied to a Bison Fuel Rod Validation...

    Office of Scientific and Technical Information (OSTI)

    VU governance process applied to a Bison Fuel Rod Validation exercise. Citation Details In-Document Search Title: A VU governance process applied to a Bison Fuel Rod Validation...

  7. Cyber Security Testing and Training Programs for Industrial Control Systems

    SciTech Connect (OSTI)

    Daniel Noyes

    2012-03-01

    Service providers rely on industrial control systems (ICS) to manage the flow of water at dams, open breakers on power grids, control ventilation and cooling in nuclear power plants, and more. In today's interconnected environment, this can present a serious cyber security challenge. To combat this growing challenge, government, private industry, and academia are working together to reduce cyber risks. The Idaho National Laboratory (INL) is a key contributor to the Department of Energy National SCADA Test Bed (NSTB) and the Department of Homeland Security (DHS) Control Systems Security Program (CSSP), both of which focus on improving the overall security posture of ICS in the national critical infrastructure. In support of the NSTB, INL hosts a dedicated SCADA testing facility which consists of multiple control systems supplied by leading national and international manufacturers. Within the test bed, INL researchers systematically examine control system components and work to identify vulnerabilities. In support of the CSSP, INL develops and conducts training courses which are designed to increase awareness and defensive capabilities for IT/Control System professionals. These trainings vary from web-based cyber security trainings for control systems engineers to more advanced hands-on training that culminates with a Red Team/ Blue Team exercise that is conducted within an actual control systems environment. INL also provides staffing and operational support to the DHS Industrial Control Systems Cyber Emergency Response Team (ICS-CERT) Security Operations Center which responds to and analyzes control systems cyber incidents across the 18 US critical infrastructure sectors.

  8. LANL responds to radiological incident

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center(LANSCE). Aerial view of the Los Alamos Neutron Science Center (LANSCE). The contamination poses no danger to the public. The Laboratory is investigating the inadvertent...

  9. ACTIVE SHOOTER HOW TO RESPOND

    E-Print Network [OSTI]

    IT IS SAFE TO DO SO! 2 ·G ·PR O O O F D I P LE RA O C F TI A CE N S A FO CT R I C VE O S PI H N O G O W TE I

  10. Responder Technology Alert (March 2015)

    E-Print Network [OSTI]

    .................................................................................................................2.5 2.1.8 Tech .............................................................2.9 2.2.1 New Mexico State University

  11. Technology Validation of Fuel Cell Vehicles and Their Hydrogen Infrastructure (Presentation)

    SciTech Connect (OSTI)

    Sprik, S.; Kurtz, J.; Wipke, K.; Saur, G.; Ainscough, C.

    2013-10-22

    This presentation summarizes NREL's analysis and validation of fuel cell electric vehicles and hydrogen fueling infrastructure technologies.

  12. Neuro-fuzzy control of a multi-degree of freedom structure with semi-active magnetorheological dampers 

    E-Print Network [OSTI]

    Likhitruangsilp, Visit

    2002-01-01

    use of an artificial earthquake. Next, performance of a fuzzy controller is validated by investigating time histories of the absolute acceleration response and the overall performance indices when the structure is subjected to a set of actual...

  13. Behavior-Based Simulation Approach for the Capacity and Traffic Operational Characteristic Study of Four-Way-Stop-Controlled Intersections

    E-Print Network [OSTI]

    Yin, Juan

    2010-08-26

    and service time. After calibration and validation, the simulation model was used to study characteristics of the queue length, control delay, and service time at FWSC intersections. Finally, intersection capacities were estimated under different traffic...

  14. control and Dynamic Systems Decentralized Control

    E-Print Network [OSTI]

    Moore, John Barratt

    control and Dynamic Systems BR Departn Decentralized Control Using Time-Varying Feedback AN D. O controller one connects to the system, so long as the controller has available to it the system inputs of the closed-loop system. If the controller CopyrightO 1985 by Academic Pres, inc. 85 Allrightsofreproductjon

  15. A New Cryosurgical Device for Controlled Freezing II. In Vivo Experiments on Skeletal Muscle of Rabbit Hindlimbs

    E-Print Network [OSTI]

    Rabin, Yoed

    A New Cryosurgical Device for Controlled Freezing II. In Vivo Experiments on Skeletal Muscle of the cooling rate at the freezing front. In the new computer-controlled cryosurgical device, the controlling at the freezing front. Details of the new cryodevice, results of a validation test, and the system characteristics

  16. Semi-valid Input Coverage for Fuzz Testing Petar Tsankov, Mohammad Torabi Dashti and David Basin

    E-Print Network [OSTI]

    Basin, David

    We define semi-valid input coverage (SVCov), the first cov- erage criterion for fuzz testing. Our upon the notion of semi-valid inputs to define a coverage criterion for fuzz testing. We defineSemi-valid Input Coverage for Fuzz Testing Petar Tsankov, Mohammad Torabi Dashti and David Basin

  17. A Versatile Scheme for the Validation, Testing and Debugging of High Speed Serial Interfaces

    E-Print Network [OSTI]

    Zilic, Zeljko

    A Versatile Scheme for the Validation, Testing and Debugging of High Speed Serial Interfaces, the post-silicon validation, debugging and testing of HSSIs are becoming critical. This paper presents and an FPGA-based Bit Error Rate Tester (BERT), we can validate and test HSSIs without the need of high

  18. Outline Motivation Theory Validation Application Conclusions Correlation screening in high dimension

    E-Print Network [OSTI]

    Tourneret, Jean-Yves

    Outline Motivation Theory Validation Application Conclusions Correlation screening in high dimension Alfred Hero University of Michigan - Ann Arbor June 14, 2011 1 / 45 #12;Outline Motivation Theory Validation Application Conclusions 1 Motivation 2 Theory 3 Validation 4 Application 5 Conclusions 2 / 45 #12

  19. Global sea-salt modeling: Results and validation against multicampaign shipboard measurements

    E-Print Network [OSTI]

    Global sea-salt modeling: Results and validation against multicampaign shipboard measurements of sea-salt concentrations from five different campaigns are used to validate the sea-salt). The validity of the sea-salt parameterizations is tested by employing a global forecasting model and transport

  20. Valmet: A new validation tool for assessing and improving 3D object segmentation

    E-Print Network [OSTI]

    Gerig, Guido

    Valmet: A new validation tool for assessing and improving 3D object segmentation 1,2 Guido Gerig, 1 Department of Psychiatry, UNC, Chapel Hill, NC 27599, USA Software: http://www.ia.unc.edu/public/valmet email are validity and reliability. We have developed VALMET, a new tool for validation and comparison of object

  1. Adaptive Accelerated ReaxFF Reactive Dynamics with Validation from Simulating Hydrogen Combustion

    E-Print Network [OSTI]

    Goddard III, William A.

    Adaptive Accelerated ReaxFF Reactive Dynamics with Validation from Simulating Hydrogen Combustion concept (BB), which we validate here for describing hydrogen combustion. The bond order, undercoordination determined the detailed sequence of reactions for hydrogen combustion with and without the BB. We validate

  2. INL Experimental Program Roadmap for Thermal Hydraulic Code Validation

    SciTech Connect (OSTI)

    Glenn McCreery; Hugh McIlroy

    2007-09-01

    Advanced computer modeling and simulation tools and protocols will be heavily relied on for a wide variety of system studies, engineering design activities, and other aspects of the Next Generation Nuclear Power (NGNP) Very High Temperature Reactor (VHTR), the DOE Global Nuclear Energy Partnership (GNEP), and light-water reactors. The goal is for all modeling and simulation tools to be demonstrated accurate and reliable through a formal Verification and Validation (V&V) process, especially where such tools are to be used to establish safety margins and support regulatory compliance, or to design a system in a manner that reduces the role of expensive mockups and prototypes. Recent literature identifies specific experimental principles that must be followed in order to insure that experimental data meet the standards required for a “benchmark” database. Even for well conducted experiments, missing experimental details, such as geometrical definition, data reduction procedures, and manufacturing tolerances have led to poor Benchmark calculations. The INL has a long and deep history of research in thermal hydraulics, especially in the 1960s through 1980s when many programs such as LOFT and Semiscle were devoted to light-water reactor safety research, the EBRII fast reactor was in operation, and a strong geothermal energy program was established. The past can serve as a partial guide for reinvigorating thermal hydraulic research at the laboratory. However, new research programs need to fully incorporate modern experimental methods such as measurement techniques using the latest instrumentation, computerized data reduction, and scaling methodology. The path forward for establishing experimental research for code model validation will require benchmark experiments conducted in suitable facilities located at the INL. This document describes thermal hydraulic facility requirements and candidate buildings and presents examples of suitable validation experiments related to VHTRs, sodium-cooled fast reactors, and light-water reactors. These experiments range from relatively low-cost benchtop experiments for investigating individual phenomena to large electrically-heated integral facilities for investigating reactor accidents and transients.

  3. Validation of the TIARA code to tritium inventory data

    SciTech Connect (OSTI)

    Billone, M.C.

    1994-03-01

    The TIARA code has been developed to predict tritium inventory in Li{sub 2}O breeder ceramic and to predict purge exit flow rate and composition. Inventory predictions are based on models for bulk diffusion, surface desorption, solubility and precipitation. Parameters for these models are determined from the results of laboratory annealing studies on unirradiated and irradiated Li{sub 2}O. Inventory data from in-reactor purge flow tests are used for model improvement, fine-tuning of model parameters and validation. In this current work, the inventory measurement near the purge inlet from the BEATRIX-II thin-ring sample is used to fine tune the surface desorption model parameters for T > 470{degrees}C, and the inventory measurement near the midplane from VOM-15H is used to fine tune the moisture solubility model parameters. predictions are then validated to the remaining inventory data from EXOTIC-2 (1 point), SIBELIUS (3 axial points), VOM-15H (2 axial points), CRITIC-1 (4 axial points), BEATRIX-II thin ring (3 axial points) and BEATRIX-II thick pellet (5 radial points). Thus. of the 20 data points, two we re used for fine tuning model parameters and 18 were used for validation. The inventory data span the range of 0.05--1.44 wppm with an average of 0.48 wppm. The data pertain to samples whose end-of-life temperatures were in the range of 490--1000{degrees}C. On the average, the TIARA predictions agree quite well with the data (< 0.02 wppm difference). However, the root-mean-square deviation is 0.44 wppm, mostly due to over-predictions for the SIBELIUS samples and the higher-temperature radial samples from the BEATRIX-11 thick-pellet.

  4. The Development of a Valid and Reliable Measure of Technological Literacy for Adults

    E-Print Network [OSTI]

    Bastion, Susan

    2014-12-31

    responded to the items and also took two existing measures which assess similar constructs (the Survey of Technological Literacy and the Technology Inventory Profile). Analysis of their data guided final item selection and suggests that the new measure...

  5. Low frequency eddy current benchmark study for model validation

    SciTech Connect (OSTI)

    Mooers, R. D.; Boehnlein, T. R. [University of Dayton Research Institute, Structural Integrity Division, Dayton, OH, 45469 (United States); Cherry, M. R.; Knopp, J. S. [Air Force Research Lab, NDE Division, Wright Patterson, OH 45433 (United States); Aldrin, J. C. [Computational Tools, Gurnee, IL 60031 (United States); Sabbagh, H. A. [Victor Technologies LLC, Bloomington, IN 47401 (United States)

    2011-06-23

    This paper presents results of an eddy current model validation study. Precise measurements were made using an impedance analyzer to investigate changes in impedance due to Electrical Discharge Machining (EDM) notches in aluminum plates. Each plate contained one EDM notch at an angle of 0, 10, 20, or 30 degrees from the normal of the plate surface. Measurements were made with the eddy current probe both scanning parallel and perpendicular to the notch length. The experimental response from the vertical and oblique notches will be reported and compared to results from different numerical simulation codes.

  6. Validating Savings Claims of Cold Climate Zero Energy Ready Homes

    SciTech Connect (OSTI)

    Williamson, J.; Puttagunta, S.

    2015-06-01

    This report details the validation methods used to analyze consumption at each of these homes. It includes a detailed end-use examination of consumptions from the following categories: 1) Heating, 2) Cooling, 3) Lights, Appliances, and Miscellaneous Electric Loads (LAMELS) along with Domestic Hot Water Use, 4) Ventilation, and 5) PV generation. A utility bill disaggregation method, which allows a crude estimation of space conditioning loads based on outdoor air temperature, was also performed and the results compared to the actual measured data.

  7. Validation of the SUNY Satellite Model in a Meteosat Evironment

    SciTech Connect (OSTI)

    Perez, R.; Schlemmer, J.; Renne, D.; Cowlin, S.; George, R.; Bandyopadhyay, B.

    2009-01-01

    The paper presents a validation of the SUNY satellite-to-irradiance model against four ground-truth stations from the Indian solar radiation network located in and around the province of Rajasthan, India. The SUNY model had initially been developed and tested to process US weather satellite data from the GOES series and has been used as part of the production of the US National Solar Resource Data Base (NSRDB). Here the model is applied to processes data from the European weather satellites Meteosat 5 and 7.

  8. Validating the BHR RANS model for variable density turbulence

    SciTech Connect (OSTI)

    Israel, Daniel M [Los Alamos National Laboratory; Gore, Robert A [Los Alamos National Laboratory; Stalsberg - Zarling, Krista L [Los Alamos National Laboratory

    2009-01-01

    The BHR RANS model is a turbulence model for multi-fluid flows in which density variation plays a strong role in the turbulence processes. In this paper they demonstrate the usefulness of BHR over a wide range of flows which include the effects of shear, buoyancy, and shocks. The results are in good agreement with experimental and DNS data across the entire set of validation cases, with no need to retune model coefficients between cases. The model has potential application to a number of aerospace related flow problems.

  9. Validation of Phonon Physics in the CDMS Detector Monte Carlo

    SciTech Connect (OSTI)

    McCarthy, K.A.; Leman, S.W.; Anderson, A.J.; /MIT; Brandt, D.; /SLAC; Brink, P.L.; Cabrera, B.; Cherry, M.; /Stanford U.; Do Couto E Silva, E.; /SLAC; Cushman, P.; /Minnesota U.; Doughty, T.; /UC, Berkeley; Figueroa-Feliciano, E.; /MIT; Kim, P.; /SLAC; Mirabolfathi, N.; /UC, Berkeley; Novak, L.; /Stanford U.; Partridge, R.; /SLAC; Pyle, M.; /Stanford U.; Reisetter, A.; /Minnesota U. /St. Olaf Coll.; Resch, R.; /SLAC; Sadoulet, B.; Serfass, B.; Sundqvist, K.M.; /UC, Berkeley /Stanford U.

    2012-06-06

    The SuperCDMS collaboration is a dark matter search effort aimed at detecting the scattering of WIMP dark matter from nuclei in cryogenic germanium targets. The CDMS Detector Monte Carlo (CDMS-DMC) is a simulation tool aimed at achieving a deeper understanding of the performance of the SuperCDMS detectors and aiding the dark matter search analysis. We present results from validation of the phonon physics described in the CDMS-DMC and outline work towards utilizing it in future WIMP search analyses.

  10. Washington State Ergonomics Tool: predictive validity in the waste industry 

    E-Print Network [OSTI]

    Eppes, Susan Elise

    2004-09-30

    stream_source_info etd-tamu-2004A-SENG-Eppes-1.pdf.txt stream_content_type text/plain stream_size 67300 Content-Encoding UTF-8 stream_name etd-tamu-2004A-SENG-Eppes-1.pdf.txt Content-Type text/plain; charset=UTF-8... WASHINGTON STATE ERGONOMICS TOOL: PREDICTIVE VALIDITY IN THE WASTE INDUSTRY A Thesis by SUSAN EPPES Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree...

  11. On the Range of Validity of the Dipole Picture

    E-Print Network [OSTI]

    Carlo Ewerz; Andreas von Manteuffel; Otto Nachtmann

    2008-04-15

    We derive correlated bounds on ratios of deep inelastic structure functions from the dipole picture of photon-hadron scattering at high energies. In particular we consider ratios of the longitudinal structure function, the total structure function and the charm part of the latter. We also consider ratios of total structure functions taken at the same energy but at three different photon virtualities. It is shown that by confronting these bounds with experimental data we can significantly constrain the range of validity of the dipole picture.

  12. Experimentally validated finite element model of electrocaloric multilayer ceramic structures

    SciTech Connect (OSTI)

    Smith, N. A. S. E-mail: maciej.rokosz@npl.co.uk Correia, T. M. E-mail: maciej.rokosz@npl.co.uk; Rokosz, M. K. E-mail: maciej.rokosz@npl.co.uk

    2014-07-28

    A novel finite element model to simulate the electrocaloric response of a multilayer ceramic capacitor (MLCC) under real environment and operational conditions has been developed. The two-dimensional transient conductive heat transfer model presented includes the electrocaloric effect as a source term, as well as accounting for radiative and convective effects. The model has been validated with experimental data obtained from the direct imaging of MLCC transient temperature variation under application of an electric field. The good agreement between simulated and experimental data, suggests that the novel experimental direct measurement methodology and the finite element model could be used to support the design of optimised electrocaloric units and operating conditions.

  13. Validation of a personal sampling method for 2-ethylhexyl acrylate 

    E-Print Network [OSTI]

    Albert, David Lynn

    1978-01-01

    with the chosen sorbent at simulated operational conditions. "E. Obtain storage data on the samoling tubes both before and after contaminant sampling to make sure the sorbent is stable and that migration tr. the back-up adsorbent bed is not so rapid... charcoal is CS2? and is also the solvent recommended by NIOSH. 3 Carbon disulfide was tested as a possible so'. vent for EHA and was found not to be acceptable. The desorption efficiency was BO? percent which is not within desired limits for a valid...

  14. Compton scattering from positronium and validity of the impulse approximation

    SciTech Connect (OSTI)

    Kaliman, Z.; Pisk, K.; Pratt, R. H.

    2011-05-15

    The cross sections for Compton scattering from positronium are calculated in the range from 1 to 100 keV incident photon energy. The calculations are based on the A{sup 2} term of the photon-electron or photon-positron interaction. Unlike in hydrogen, the scattering occurs from two centers and the interference effect plays an important role for energies below 8 keV. Because of the interference, the criterion for validity of the impulse approximation for positronium is more restrictive compared to that for hydrogen.

  15. ARM - Field Campaign - AIRS Validation Soundings - Phases 6 and 7

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach HomeA Better Anode Design to Improve4AJ01) (See22, 2012 [DataJulyMarchgovCampaignsAIRS Validation

  16. PV Validation and Bankability Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy Bills andOrder 422.1, CONDUCT P - .Energy 5PV Validation and Bankability

  17. PV Validation and Bankability Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy Bills andOrder 422.1, CONDUCT P - .Energy 5PV Validation and

  18. Technology Validation: Fuel Cell Bus Evaluations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaics »Tankless WaterEnergyJanuary28-982This form isValidation:

  19. An Algebraic Speci cation of the Steam-Boiler Control System

    E-Print Network [OSTI]

    Bidoit, Michel

    An Algebraic Speci#12;cation of the Steam-Boiler Control System Michel Bidoit 1 , Claude Chevenier describe how to derive an algebraic speci#12;cation of the Steam-Boiler Control System starting from to specify the detection of the steam-boiler fail- ures. Finally we discuss validation and veri#12;cation

  20. Aalborg Universitet Distributed Bus Signaling Control for a DC Charging Station with Multi Paralleled

    E-Print Network [OSTI]

    Vasquez, Juan Carlos

    been reported in order to verify the validity of proposed approach. Keywords--EV charging; flywheelAalborg Universitet Distributed Bus Signaling Control for a DC Charging Station with Multi., & Savaghebi, M. (2015). Distributed Bus Signaling Control for a DC Charging Station with Multi Paralleled

  1. Test plan for validation of the radiative transfer equation.

    SciTech Connect (OSTI)

    Ricks, Allen Joseph; Grasser, Thomas W.; Kearney, Sean Patrick; Jernigan, Dann A.; Blanchat, Thomas K.

    2010-09-01

    As the capabilities of numerical simulations increase, decision makers are increasingly relying upon simulations rather than experiments to assess risks across a wide variety of accident scenarios including fires. There are still, however, many aspects of fires that are either not well understood or are difficult to treat from first principles due to the computational expense. For a simulation to be truly predictive and to provide decision makers with information which can be reliably used for risk assessment the remaining physical processes must be studied and suitable models developed for the effects of the physics. A set of experiments are outlined in this report which will provide soot volume fraction/temperature data and heat flux (intensity) data for the validation of models for the radiative transfer equation. In addition, a complete set of boundary condition measurements will be taken to allow full fire predictions for validation of the entire fire model. The experiments will be performed with a lightly-sooting liquid hydrocarbon fuel fire in the fully turbulent scale range (2 m diameter).

  2. Thermal Control & System Integration

    Broader source: Energy.gov [DOE]

    The thermal control and system integration activity focuses on issues such as the integration of motor and power control technologies and the development of advanced thermal control technologies....

  3. Digital gate pulse generator for cycloconverter control

    DOE Patents [OSTI]

    Klein, Frederick F. (Monroeville, PA); Mutone, Gioacchino A. (Pleasant Hills, PA)

    1989-01-01

    The present invention provides a digital gate pulse generator which controls the output of a cycloconverter used for electrical power conversion applications by determining the timing and delivery of the firing pulses to the switching devices in the cycloconverter. Previous gate pulse generators have been built with largely analog or discrete digital circuitry which require many precision components and periodic adjustment. The gate pulse generator of the present invention utilizes digital techniques and a predetermined series of values to develop the necessary timing signals for firing the switching device. Each timing signal is compared with a reference signal to determine the exact firing time. The present invention is significantly more compact than previous gate pulse generators, responds quickly to changes in the output demand and requires only one precision component and no adjustments.

  4. Predictive Optimal Control of Active and Passive Building Thermal Storage Inventory

    SciTech Connect (OSTI)

    Gregor P. Henze; Moncef Krarti

    2005-09-30

    Cooling of commercial buildings contributes significantly to the peak demand placed on an electrical utility grid. Time-of-use electricity rates encourage shifting of electrical loads to off-peak periods at night and weekends. Buildings can respond to these pricing signals by shifting cooling-related thermal loads either by precooling the building's massive structure or the use of active thermal energy storage systems such as ice storage. While these two thermal batteries have been engaged separately in the past, this project investigated the merits of harnessing both storage media concurrently in the context of predictive optimal control. To pursue the analysis, modeling, and simulation research of Phase 1, two separate simulation environments were developed. Based on the new dynamic building simulation program EnergyPlus, a utility rate module, two thermal energy storage models were added. Also, a sequential optimization approach to the cost minimization problem using direct search, gradient-based, and dynamic programming methods was incorporated. The objective function was the total utility bill including the cost of reheat and a time-of-use electricity rate either with or without demand charges. An alternative simulation environment based on TRNSYS and Matlab was developed to allow for comparison and cross-validation with EnergyPlus. The initial evaluation of the theoretical potential of the combined optimal control assumed perfect weather prediction and match between the building model and the actual building counterpart. The analysis showed that the combined utilization leads to cost savings that is significantly greater than either storage but less than the sum of the individual savings. The findings reveal that the cooling-related on-peak electrical demand of commercial buildings can be considerably reduced. A subsequent analysis of the impact of forecasting uncertainty in the required short-term weather forecasts determined that it takes only very simple short-term prediction models to realize almost all of the theoretical potential of this control strategy. Further work evaluated the impact of modeling accuracy on the model-based closed-loop predictive optimal controller to minimize utility cost. The following guidelines have been derived: For an internal heat gain dominated commercial building, reasonable geometry simplifications are acceptable without a loss of cost savings potential. In fact, zoning simplification may improve optimizer performance and save computation time. The mass of the internal structure did not show a strong effect on the optimization. Building construction characteristics were found to impact building passive thermal storage capacity. It is thus advisable to make sure the construction material is well modeled. Zone temperature setpoint profiles and TES performance are strongly affected by mismatches in internal heat gains, especially when they are underestimated. Since they are a key factor in determining the building cooling load, efforts should be made to keep the internal gain mismatch as small as possible. Efficiencies of the building energy systems affect both zone temperature setpoints and active TES operation because of the coupling of the base chiller for building precooling and the icemaking TES chiller. Relative efficiencies of the base and TES chillers will determine the balance of operation of the two chillers. The impact of mismatch in this category may be significant. Next, a parametric analysis was conducted to assess the effects of building mass, utility rate, building location and season, thermal comfort, central plant capacities, and an economizer on the cost saving performance of optimal control for active and passive building thermal storage inventory. The key findings are: (1) Heavy-mass buildings, strong-incentive time-of-use electrical utility rates, and large on-peak cooling loads will likely lead to attractive savings resulting from optimal combined thermal storage control. (2) By using economizer to take advantage of the cool fresh air during the night, the bu

  5. Integrated Transmission and Distribution Control

    SciTech Connect (OSTI)

    Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

    2013-01-16

    Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: • Develop a simulation environment for integrating transmission and distribution control, • Construct reduced-order controllable models for smart grid assets at the distribution level, • Design and validate closed-loop control strategies for distributed smart grid assets, and • Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment allows the load flow interactions between the bulk power system and end-use loads to be explicitly modeled. Power system interactions are modeled down to time intervals as short as 1-second. Another practical issue is that the size and complexity of typical distribution systems makes direct integration with transmission models computationally intractable. Hence, the focus of the next main task is to develop reduced-order controllable models for some of the smart grid assets. In particular, HVAC units, which are a type of Thermostatically Controlled Loads (TCLs), are considered. The reduced-order modeling approach can be extended to other smart grid assets, like water heaters, PVs and PHEVs. Closed-loop control strategies are designed for a population of HVAC units under realistic conditions. The proposed load controller is fully responsive and achieves the control objective without sacrificing the end-use performance. Finally, using the T&D simulation platform, the benefits to the bulk power system are demonstrated by controlling smart grid assets under different demand response closed-loop control strategies.

  6. Finance & Administration Controller's Office

    E-Print Network [OSTI]

    McQuade, D. Tyler

    Finance & Administration Controller's Office July 2014 Michael Williams Controller Controller Administrative Services 51111 Catherine Hebert Program Director ICOFA 61318 Revised: 7/28/2014 #12;Finance Surplus Property 81269 Revised: 7/28/2014 #12;Finance & Administration Controller's Office Disbursement

  7. Skinner-Rusk Unified Formalism for Optimal Control Systems and Applications

    E-Print Network [OSTI]

    M. Barbero-Liñan; A. Echeverria-Enriquez; D. Martin de Diego; M. C. Muñoz-Lecanda; N. Roman-Roy

    2007-10-18

    A geometric approach to time-dependent optimal control problems is proposed. This formulation is based on the Skinner and Rusk formalism for Lagrangian and Hamiltonian systems. The corresponding unified formalism developed for optimal control systems allows us to formulate geometrically the necessary conditions given by Pontryagin's Maximum Principle, provided that the differentiability with respect to controls is assumed and the space of controls is open. Furthermore, our method is also valid for implicit optimal control systems and, in particular, for the so-called descriptor systems (optimal control problems including both differential and algebraic equations).

  8. INTERIM VALIDATION REPORT MIDDLE DISTILLATE PRICE MONITORING SYSTEM

    E-Print Network [OSTI]

    Hopelain, D.G.

    2011-01-01

    oil and No. 2-D diesel fuel, from price and allocationdiesel fuel, effective October 1, 1977, bad assumed from pricellY controlled prices at No. 2-D diesel fuel to ultimate

  9. Validation of techniques to mitigate copper surface contamination in CUORE

    E-Print Network [OSTI]

    F. Alessandria; R. Ardito; D. R. Artusa; F. T. Avignone III; O. Azzolini; M. Balata; T. I. Banks; G. Bari; J. Beeman; F. Bellini; A. Bersani; M. Biassoni; T. Bloxham; C. Brofferio; C. Bucci; X. Z. Cai; L. Canonica; S. Capelli; L. Carbone; L. Cardani; M. Carrettoni; N. Casali; N. Chott; M. Clemenza; C. Cosmelli; O. Cremonesi; R. J. Creswick; I. Dafinei; A. Dally; V. Datskov; A. De Biasi; M. M. Deninno; S. Di Domizio; M. L. di Vacri; L. Ejzak; R. Faccini; D. Q. Fang; H. A. Farach; E. Ferri; F. Ferroni; E. Fiorini; M. A. Franceschi; S. J. Freedman; B. K. Fujikawa; A. Giachero; L. Gironi; A. Giuliani; J. Goett; A. Goodsell; P. Gorla; C. Gotti; E. Guardincerri; T. D. Gutierrez; E. E. Haller; K. Han; K. M. Heeger; H. Z. Huang; R. Kadel; K. Kazkaz; G. Keppel; L. Kogler; Yu. G. Kolomensky; D. Lenz; Y. L. Li; C. Ligi; X. Liu; Y. G. Ma; C. Maiano; M. Maino; M. Martinez; R. H. Maruyama; Y. Mei; N. Moggi; S. Morganti; T. Napolitano; S. Newman; S. Nisi; C. Nones; E. B. Norman; A. Nucciotti; F. Orio; D. Orlandi; J. L. Ouellet; M. Pallavicini; V. Palmieri; L. Pattavina; M. Pavan; M. Pedretti; G. Pessina; S. Pirro; E. Previtali; V. Rampazzo; R. Reil; F. Rimondi; C. Rosenfeld; C. Rusconi; S. Sangiorgio; N. D. Scielzo; M. Sisti; A. R. Smith; L. Sparks; F. Stivanello; L. Taffarello; M. Tenconi; W. D. Tian; C. Tomei; S. Trentalange; G. Ventura; M. Vignati; B. S. Wang; H. W. Wang; C. A. Whitten Jr; T. Wise; A. Woodcraft; L. Zanotti; C. Zarra; B. X. Zhu; S. Zucchelli

    2013-04-04

    In this article we describe the background challenges for the CUORE experiment posed by surface contamination of inert detector materials such as copper, and present three techniques explored to mitigate these backgrounds. Using data from a dedicated test apparatus constructed to validate and compare these techniques we demonstrate that copper surface contamination levels better than 10E-07 - 10E-08 Bq/cm2 are achieved for 238U and 232Th. If these levels are reproduced in the final CUORE apparatus the projected 90% C.L. upper limit on the number of background counts in the region of interest is 0.02-0.03 counts/keV/kg/y depending on the adopted mitigation technique.

  10. Validation Analysis of the Shoal Groundwater Flow and Transport Model

    SciTech Connect (OSTI)

    A. Hassan; J. Chapman

    2008-11-01

    Environmental restoration at the Shoal underground nuclear test is following a process prescribed by a Federal Facility Agreement and Consent Order (FFACO) between the U.S. Department of Energy, the U.S. Department of Defense, and the State of Nevada. Characterization of the site included two stages of well drilling and testing in 1996 and 1999, and development and revision of numerical models of groundwater flow and radionuclide transport. Agreement on a contaminant boundary for the site and a corrective action plan was reached in 2006. Later that same year, three wells were installed for the purposes of model validation and site monitoring. The FFACO prescribes a five-year proof-of-concept period for demonstrating that the site groundwater model is capable of producing meaningful results with an acceptable level of uncertainty. The corrective action plan specifies a rigorous seven step validation process. The accepted groundwater model is evaluated using that process in light of the newly acquired data. The conceptual model of ground water flow for the Project Shoal Area considers groundwater flow through the fractured granite aquifer comprising the Sand Springs Range. Water enters the system by the infiltration of precipitation directly on the surface of the mountain range. Groundwater leaves the granite aquifer by flowing into alluvial deposits in the adjacent basins of Fourmile Flat and Fairview Valley. A groundwater divide is interpreted as coinciding with the western portion of the Sand Springs Range, west of the underground nuclear test, preventing flow from the test into Fourmile Flat. A very low conductivity shear zone east of the nuclear test roughly parallels the divide. The presence of these lateral boundaries, coupled with a regional discharge area to the northeast, is interpreted in the model as causing groundwater from the site to flow in a northeastward direction into Fairview Valley. Steady-state flow conditions are assumed given the absence of groundwater withdrawal activities in the area. The conceptual and numerical models were developed based upon regional hydrogeologic investigations conducted in the 1960s, site characterization investigations (including ten wells and various geophysical and geologic studies) at Shoal itself prior to and immediately after the test, and two site characterization campaigns in the 1990s for environmental restoration purposes (including eight wells and a year-long tracer test). The new wells are denoted MV-1, MV-2, and MV-3, and are located to the northnortheast of the nuclear test. The groundwater model was generally lacking data in the north-northeastern area; only HC-1 and the abandoned PM-2 wells existed in this area. The wells provide data on fracture orientation and frequency, water levels, hydraulic conductivity, and water chemistry for comparison with the groundwater model. A total of 12 real-number validation targets were available for the validation analysis, including five values of hydraulic head, three hydraulic conductivity measurements, three hydraulic gradient values, and one angle value for the lateral gradient in radians. In addition, the fracture dip and orientation data provide comparisons to the distributions used in the model and radiochemistry is available for comparison to model output. Goodness-of-fit analysis indicates that some of the model realizations correspond well with the newly acquired conductivity, head, and gradient data, while others do not. Other tests indicated that additional model realizations may be needed to test if the model input distributions need refinement to improve model performance. This approach (generating additional realizations) was not followed because it was realized that there was a temporal component to the data disconnect: the new head measurements are on the high side of the model distributions, but the heads at the original calibration locations themselves have also increased over time. This indicates that the steady-state assumption of the groundwater model is in error. To test the robustness of the model d

  11. System Advisor Model: Flat Plate Photovoltaic Performance Modeling Validation Report

    SciTech Connect (OSTI)

    Freeman, J.; Whitmore, J.; Kaffine, L.; Blair, N.; Dobos, A. P.

    2013-12-01

    The System Advisor Model (SAM) is a free software tool that performs detailed analysis of both system performance and system financing for a variety of renewable energy technologies. This report provides detailed validation of the SAM flat plate photovoltaic performance model by comparing SAM-modeled PV system generation data to actual measured production data for nine PV systems ranging from 75 kW to greater than 25 MW in size. The results show strong agreement between SAM predictions and field data, with annualized prediction error below 3% for all fixed tilt cases and below 8% for all one axis tracked cases. The analysis concludes that snow cover and system outages are the primary sources of disagreement, and other deviations resulting from seasonal biases in the irradiation models and one axis tracking issues are discussed in detail.

  12. Validation of Power Output for the WIND Toolkit

    SciTech Connect (OSTI)

    King, J.; Clifton, A.; Hodge, B. M.

    2014-09-01

    Renewable energy integration studies require wind data sets of high quality with realistic representations of the variability, ramping characteristics, and forecast performance for current wind power plants. The Wind Integration National Data Set (WIND) Toolkit is meant to be an update for and expansion of the original data sets created for the weather years from 2004 through 2006 during the Western Wind and Solar Integration Study and the Eastern Wind Integration Study. The WIND Toolkit expands these data sets to include the entire continental United States, increasing the total number of sites represented, and it includes the weather years from 2007 through 2012. In addition, the WIND Toolkit has a finer resolution for both the temporal and geographic dimensions. Three separate data sets will be created: a meteorological data set, a wind power data set, and a forecast data set. This report describes the validation of the wind power data set.

  13. Computational Design and Experimental Validation of New Thermal Barrier Systems

    SciTech Connect (OSTI)

    Guo, Shengmin; Yang, Shizhong; Khosravi, Ebrahim

    2012-10-01

    This project (10/01/2010-9/30/2013), “Computational Design and Experimental Validation of New Thermal Barrier Systems”, originates from Louisiana State University (LSU) Mechanical Engineering Department and Southern University (SU) Department of Computer Science. This project will directly support the technical goals specified in DEFOA- 0000248, Topic Area 3: Turbine Materials, by addressing key technologies needed to enable the development of advanced turbines and turbine-based systems that will operate safely and efficiently using coal-derived synthesis gases. We will develop and implement novel molecular dynamics method to improve the efficiency of simulation on novel TBC materials; perform high performance computing (HPC) on complex TBC structures to screen the most promising TBC compositions; perform material characterizations and oxidation/corrosion tests; and demonstrate our new thermal barrier coating (TBC) systems experimentally under integrated gasification combined cycle (IGCC) environments. The durability of the coating will be examined using the proposed Durability Test Rig.

  14. Computational Design and Experimental Validation of New Thermal Barrier Systems

    SciTech Connect (OSTI)

    Guo, Shengmin; Yang, Shizhong; Khosravi, Ebrahim

    2014-04-01

    This project (10/01/2010-9/30/2014), “Computational Design and Experimental Validation of New Thermal Barrier Systems”, originates from Louisiana State University (LSU) Mechanical Engineering Department and Southern University (SU) Department of Computer Science. This project will directly support the technical goals specified in DE-FOA-0000248, Topic Area 3: Turbine Materials, by addressing key technologies needed to enable the development of advanced turbines and turbine-based systems that will operate safely and efficiently using coal-derived synthesis gases. In this project, the focus is to develop and implement novel molecular dynamics method to improve the efficiency of simulation on novel TBC materials; perform high performance computing (HPC) on complex TBC structures to screen the most promising TBC compositions; perform material characterizations and oxidation/corrosion tests; and demonstrate our new thermal barrier coating (TBC) systems experimentally under integrated gasification combined cycle (IGCC) environments.

  15. Field Test of Boiler Primary Loop Temperature Controller

    SciTech Connect (OSTI)

    Glanville, P.; Rowley, P.; Schroeder, D.; Brand, L.

    2014-09-01

    Beyond these initial system efficiency upgrades are an emerging class of Advanced Load Monitoring (ALM) aftermarket controllers that dynamically respond to the boiler load, with claims of 10% to 30% of fuel savings over a heating season. For hydronic boilers specifically, these devices perform load monitoring, with continuous measurement of supply and, in some cases, return water temperatures. Energy savings from these ALM controllers are derived from dynamic management of the boiler differential, where a microprocessor with memory of past boiler cycles prevents the boiler from firing for a period of time, to limit cycling losses and inefficient operation during perceived low load conditions. These differ from OTR controllers, which vary boiler setpoint temperatures with ambient conditions while maintaining a fixed differential.

  16. Knock-free engine control system for turbocharged automotive engine

    SciTech Connect (OSTI)

    Hirabayashi, Y.

    1985-04-09

    In a turbocharged internal combustion engine, in order to optimize engine torque output spark timing control and boost pressure control are coordinated in such a manner that spark advance angle is adjusted only when the measured boost pressure equals a predetermined value and is allowed to vary only within a specified range advanced from a reference value derived from an empirical memory table on the basis of engine speed and boost pressure. When engine operating conditions are such that spark advance angle would fall outside of the specified range, spark advance angle is then held at the empirical value and boost pressure is adjusted in order to optimize engine torque. The coordinated control system can also be designed to respond to exhaust gas temperature on a first-priority basis, i.e., when exhaust temperature is sensed to be dangerously high, boost pressure is reduced regardless of other engine conditions.

  17. Pareto Efficient Policy for Supervisory Power Management Control

    SciTech Connect (OSTI)

    Malikopoulos, Andreas

    2015-01-01

    n this paper we address the problem of online optimization of the supervisory power management control in parallel hybrid electric vehicles (HEVs). We model HEV opera- tion as a controlled Markov chain using the long-run expected average cost per unit time criterion, and we show that the control policy yielding the Pareto optimal solution minimizes the average cost criterion online. The effectiveness of the proposed solution is validated through simulation and compared to the solution derived with dynamic programming using the average cost criterion.

  18. Validation of thermal models for a prototypical MEMS thermal actuator.

    SciTech Connect (OSTI)

    Gallis, Michail A.; Torczynski, John Robert; Piekos, Edward Stanley; Serrano, Justin Raymond; Gorby, Allen D.; Phinney, Leslie Mary

    2008-09-01

    This report documents technical work performed to complete the ASC Level 2 Milestone 2841: validation of thermal models for a prototypical MEMS thermal actuator. This effort requires completion of the following task: the comparison between calculated and measured temperature profiles of a heated stationary microbeam in air. Such heated microbeams are prototypical structures in virtually all electrically driven microscale thermal actuators. This task is divided into four major subtasks. (1) Perform validation experiments on prototypical heated stationary microbeams in which material properties such as thermal conductivity and electrical resistivity are measured if not known and temperature profiles along the beams are measured as a function of electrical power and gas pressure. (2) Develop a noncontinuum gas-phase heat-transfer model for typical MEMS situations including effects such as temperature discontinuities at gas-solid interfaces across which heat is flowing, and incorporate this model into the ASC FEM heat-conduction code Calore to enable it to simulate these effects with good accuracy. (3) Develop a noncontinuum solid-phase heat transfer model for typical MEMS situations including an effective thermal conductivity that depends on device geometry and grain size, and incorporate this model into the FEM heat-conduction code Calore to enable it to simulate these effects with good accuracy. (4) Perform combined gas-solid heat-transfer simulations using Calore with these models for the experimentally investigated devices, and compare simulation and experimental temperature profiles to assess model accuracy. These subtasks have been completed successfully, thereby completing the milestone task. Model and experimental temperature profiles are found to be in reasonable agreement for all cases examined. Modest systematic differences appear to be related to uncertainties in the geometric dimensions of the test structures and in the thermal conductivity of the polycrystalline silicon test structures, as well as uncontrolled nonuniform changes in this quantity over time and during operation.

  19. Foundation Heat Exchanger Final Report: Demonstration, Measured Performance, and Validated Model and Design Tool

    SciTech Connect (OSTI)

    Hughes, Patrick [ORNL; Im, Piljae [ORNL

    2012-01-01

    Geothermal heat pumps, sometimes called ground-source heat pumps (GSHPs), have been proven capable of significantly reducing energy use and peak demand in buildings. Conventional equipment for controlling the temperature and humidity of a building, or supplying hot water and fresh outdoor air, must exchange energy (or heat) with the building's outdoor environment. Equipment using the ground as a heat source and heat sink consumes less non-renewable energy (electricity and fossil fuels) because the earth is cooler than outdoor air in summer and warmer in winter. The most important barrier to rapid growth of the GSHP industry is high first cost of GSHP systems to consumers. The most common GSHP system utilizes a closed-loop ground heat exchanger. This type of GSHP system can be used almost anywhere. There is reason to believe that reducing the cost of closed-loop systems is the strategy that would achieve the greatest energy savings with GSHP technology. The cost premium of closed-loop GSHP systems over conventional space conditioning and water heating systems is primarily associated with drilling boreholes or excavating trenches, installing vertical or horizontal ground heat exchangers, and backfilling the excavations. This project investigates reducing the cost of horizontal closed-loop ground heat exchangers by installing them in the construction excavations, augmented when necessary with additional trenches. This approach applies only to new construction of residential and light commercial buildings or additions to such buildings. In the business-as-usual scenario, construction excavations are not used for the horizontal ground heat exchanger (HGHX); instead the HGHX is installed entirely in trenches dug specifically for that purpose. The potential cost savings comes from using the construction excavations for the installation of ground heat exchangers, thereby minimizing the need and expense of digging additional trenches. The term foundation heat exchanger (FHX) has been coined to refer exclusively to ground heat exchangers installed in the overcut around the basement walls. The primary technical challenge undertaken by this project was the development and validation of energy performance models and design tools for FHX. In terms of performance modeling and design, ground heat exchangers in other construction excavations (e.g., utility trenches) are no different from conventional HGHX, and models and design tools for HGHX already exist. This project successfully developed and validated energy performance models and design tools so that FHX or hybrid FHX/HGHX systems can be engineered with confidence, enabling this technology to be applied in residential and light commercial buildings. The validated energy performance model also addresses and solves another problem, the longstanding inadequacy in the way ground-building thermal interaction is represented in building energy models, whether or not there is a ground heat exchanger nearby. Two side-by-side, three-level, unoccupied research houses with walkout basements, identical 3,700 ft{sup 2} floor plans, and hybrid FHX/HGHX systems were constructed to provide validation data sets for the energy performance model and design tool. The envelopes of both houses are very energy efficient and airtight, and the HERS ratings of the homes are 44 and 45 respectively. Both houses are mechanically ventilated with energy recovery ventilators, with space conditioning provided by water-to-air heat pumps with 2 ton nominal capacities. Separate water-to-water heat pumps with 1.5 ton nominal capacities were used for water heating. In these unoccupied research houses, human impact on energy use (hot water draw, etc.) is simulated to match the national average. At House 1 the hybrid FHX/HGHX system was installed in 300 linear feet of excavation, and 60% of that was construction excavation (needed to construct the home). At House 2 the hybrid FHX/HGHX system was installed in 360 feet of excavation, 50% of which was construction excavation. There are six pipes in all excavations (three par

  20. Incoherent Control of Locally Controllable Quantum Systems

    E-Print Network [OSTI]

    Daoyi Dong; Chenbin Zhang; Herschel Rabitz; Alexander Pechen; Tzyh-Jong Tarn

    2008-10-21

    An incoherent control scheme for state control of locally controllable quantum systems is proposed. This scheme includes three steps: (1) amplitude amplification of the initial state by a suitable unitary transformation, (2) projective measurement on the amplified state, and (3) final optimization by a unitary controlled transformation. The first step increases the amplitudes of some desired eigenstates and the corresponding probability of observing these eigenstates, the second step projects, with high probability, the amplified state into a desired eigenstate, and the last step steers this eigenstate into the target state. Within this scheme, two control algorithms are presented for two classes of quantum systems. As an example, the incoherent control scheme is applied to the control of a hydrogen atom by an external field. The results support the suggestion that projective measurements can serve as an effective control and local controllability information can be used to design control laws for quantum systems. Thus, this scheme establishes a subtle connection between control design and controllability analysis of quantum systems and provides an effective engineering approach for controlling quantum systems with partial controllability information.

  1. Alarm system for a nuclear control complex

    DOE Patents [OSTI]

    Scarola, Kenneth (Windsor, CT); Jamison, David S. (Windsor, CT); Manazir, Richard M. (North Canton, CT); Rescorl, Robert L. (Vernon, CT); Harmon, Daryl L. (Enfield, CT)

    1994-01-01

    An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

  2. Console for a nuclear control complex

    DOE Patents [OSTI]

    Scarola, Kenneth (Windsor, CT); Jamison, David S. (Windsor, CT); Manazir, Richard M. (North Canton, CT); Rescorl, Robert L. (Vernon, CT); Harmon, Daryl L. (Enfield, CT)

    1993-01-01

    An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

  3. Advanced nuclear plant control room complex

    DOE Patents [OSTI]

    Scarola, Kenneth (Windsor, CT); Jamison, David S. (Windsor, CT); Manazir, Richard M. (North Canton, CT); Rescorl, Robert L. (Vernon, CT); Harmon, Daryl L. (Enfield, CT)

    1993-01-01

    An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

  4. Validation of MCNP4a for highly enriched uranium using the Battelle process safety and risk management IBM RS/6000 workstation

    SciTech Connect (OSTI)

    Negron, S.B.; Lee, B.L. Jr.; Tayloe, R.W. Jr.

    1996-01-01

    This document has been prepared to allow use of the Radiation Shielding and Information Center (RSIC) release of MCNP4a, which has been installed on the Battelle Process Safety and Risk Management (PSRM) IBM RS/6000 workstation, for production calculations for the Portsmouth Gaseous Diffusion Plant (PORTS). This hardware/software configuration is under the configuration control plan listed in Reference 1. The first portion of this document outlines basic information with regard to validation of MCNP4a using the supplied cross sections and the additional MCNPDAT cross sections. A basic discussion of MCNP is provided, along with discussions of the validation database in general. A description of the statistical analysis then follows. The results of this validation indicate that the software and data libraries examined may be used with confidence for criticality calculations at the Portsmouth Gaseous Diffusion Plant (PORTS). When the validation results are treated as a single group, there is a 95% confidence that 99.9% of future calculations of similar critical systems will have a calculated k{sub eff} > 0.95. Based on this result, the Battelle PSRM Nuclear Safety Group has adopted the calculational acceptance criteria that a calculated k{sub eff} + 2{sigma}, {le} 0.95 is safely subcritical. The conclusion of this document is that MCNP4a and all associated cross section libraries installed on the PSRM IBM RS/6000 are acceptable for use in performing production criticality safety calculations for the Portsmouth Gaseous Diffusion Plant.

  5. Military and diplomatic roles and options for managing and responding to the proliferation of ballistic missiles and weapons of mass destruction. Final report: Program on Stability and the Offense/Defense Relationship

    SciTech Connect (OSTI)

    Hallenbeck, R.A.; Gill, J.M.; Murray, B.L.

    1993-05-26

    The March seminar, ``Military and Diplomatic Roles and Options`` for managing and responding to proliferation, featured three presentations: the military and diplomatic implications of preemptive force as a counterproliferation option; an in-depth assessment of the threat posed by biological weapons; and, a new proposed US counterproliferation policy.

  6. Experimental evidence of ion acoustic soliton chain formation and validation of nonlinear fluid theory

    SciTech Connect (OSTI)

    Kakad, Amar; Indian Institute of Geomagnetism, New Panvel, Navi Mumbai 410-218 ; Omura, Yoshiharu; Kakad, Bharati

    2013-06-15

    We perform one-dimensional fluid simulation of ion acoustic (IA) solitons propagating parallel to the magnetic field in electron-ion plasmas by assuming a large system length. To model the initial density perturbations (IDP), we employ a KdV soliton type solution. Our simulation demonstrates that the generation mechanism of IA solitons depends on the wavelength of the IDP. The short wavelength IDP evolve into two oppositely propagating identical IA solitons, whereas the long wavelength IDP develop into two indistinguishable chains of multiple IA solitons through a wave breaking process. The wave breaking occurs close to the time when electrostatic energy exceeds half of the kinetic energy of the electron fluid. The wave breaking amplitude and time of its initiation are found to be dependent on characteristics of the IDP. The strength of the IDP controls the number of IA solitons in the solitary chains. The speed, width, and amplitude of IA solitons estimated during their stable propagation in the simulation are in good agreement with the nonlinear fluid theory. This fluid simulation is the first to confirm the validity of the general nonlinear fluid theory, which is widely used in the study of solitary waves in laboratory and space plasmas.

  7. Validation of Multiple Tools for Flat Plate Photovoltaic Modeling Against Measured Data

    SciTech Connect (OSTI)

    Freeman, J.; Whitmore, J.; Blair, N.; Dobos, A. P.

    2014-08-01

    This report expands upon a previous work by the same authors, published in the 40th IEEE Photovoltaic Specialists conference. In this validation study, comprehensive analysis is performed on nine photovoltaic systems for which NREL could obtain detailed performance data and specifications, including three utility-scale systems and six commercial scale systems. Multiple photovoltaic performance modeling tools were used to model these nine systems, and the error of each tool was analyzed compared to quality-controlled measured performance data. This study shows that, excluding identified outliers, all tools achieve annual errors within +/-8% and hourly root mean squared errors less than 7% for all systems. It is further shown using SAM that module model and irradiance input choices can change the annual error with respect to measured data by as much as 6.6% for these nine systems, although all combinations examined still fall within an annual error range of +/-8.5%. Additionally, a seasonal variation in monthly error is shown for all tools. Finally, the effects of irradiance data uncertainty and the use of default loss assumptions on annual error are explored, and two approaches to reduce the error inherent in photovoltaic modeling are proposed.

  8. Validation of the new code package APOLLO2.8 for accurate PWR neutronics calculations

    SciTech Connect (OSTI)

    Santamarina, A.; Bernard, D.; Blaise, P.; Leconte, P.; Palau, J. M.; Roque, B.; Vaglio, C.; Vidal, J. F.

    2013-07-01

    This paper summarizes the Qualification work performed to demonstrate the accuracy of the new APOLLO2.S/SHEM-MOC package based on JEFF3.1.1 nuclear data file for the prediction of PWR neutronics parameters. This experimental validation is based on PWR mock-up critical experiments performed in the EOLE/MINERVE zero-power reactors and on P.I. Es on spent fuel assemblies from the French PWRs. The Calculation-Experiment comparison for the main design parameters is presented: reactivity of UOX and MOX lattices, depletion calculation and fuel inventory, reactivity loss with burnup, pin-by-pin power maps, Doppler coefficient, Moderator Temperature Coefficient, Void coefficient, UO{sub 2}-Gd{sub 2}O{sub 3} poisoning worth, Efficiency of Ag-In-Cd and B4C control rods, Reflector Saving for both standard 2-cm baffle and GEN3 advanced thick SS reflector. From this qualification process, calculation biases and associated uncertainties are derived. This code package APOLLO2.8 is already implemented in the ARCADIA new AREVA calculation chain for core physics and is currently under implementation in the future neutronics package of the French utility Electricite de France. (authors)

  9. Standard Problems for CFD Validation for NGNP - Status Report

    SciTech Connect (OSTI)

    Richard W. Johnson; Richard R. Schultz

    2010-08-01

    The U.S. Department of Energy (DOE) is conducting research and development to support the resurgence of nuclear power in the United States for both electrical power generation and production of process heat required for industrial processes such as the manufacture of hydrogen for use as a fuel in automobiles. The project is called the Next Generation Nuclear Plant (NGNP) Project, which is based on a Generation IV reactor concept called the very high temperature reactor (VHTR). The VHTR will be of the prismatic or pebble bed type; the former is considered herein. The VHTR will use helium as the coolant at temperatures ranging from 250°C to perhaps 1000°C. While computational fluid dynamics (CFD) has not previously been used for the safety analysis of nuclear reactors in the United States, it is being considered for existing and future reactors. It is fully recognized that CFD simulation codes will have to be validated for flow physics reasonably close to actual fluid dynamic conditions expected in normal operational and accident situations. The “Standard Problem” is an experimental data set that represents an important physical phenomenon or phenomena, whose selection is based on a phenomena identification and ranking table (PIRT) for the reactor in question. It will be necessary to build a database that contains a number of standard problems for use to validate CFD and systems analysis codes for the many physical problems that will need to be analyzed. The first two standard problems that have been developed for CFD validation consider flow in the lower plenum of the VHTR and bypass flow in the prismatic core. Both involve scaled models built from quartz and designed to be installed in the INL’s matched index of refraction (MIR) test facility. The MIR facility employs mineral oil as the working fluid at a constant temperature. At this temperature, the index of refraction of the mineral oil is the same as that of the quartz. This provides an advantage to the optics used for data gathering. Particle image velocimetry (PIV) is used to take the data. The first standard problem represents several flow physics expected to be present in the lower plenum of the prismatic VHTR. In the lower plenum, heated helium coolant in the form of jets issues downward into the plenum and is then forced to turn ninety degrees and flow toward the exit duct. The lower plenum is filled with cylindrical graphite posts that hold up the core. Figure S-1 provides a plan view of the lower plenum. The red circles represent support posts holding up columns of heated blocks. Grey circles represent support posts under columns of reflector blocks. Helium enters the lower plenum at the junctions of the hexagonal blocks.

  10. Minimal control power of the controlled teleportation

    E-Print Network [OSTI]

    Kabgyun Jeong; Jaewan Kim; Soojoon Lee

    2015-09-17

    We generalize the control power of a perfect controlled teleportation on some entangled three-qubit pure state suggested in [Phy. Rev. A {\\bf 90}, 052305 (2014)] to the control power of a general controlled teleportation on a multi-qubit pure state. In addition, we define the minimal control power, and calculate the values of the minimal control power on a class of general three-qubit GHZ states and the three-qubit W class whose states have zero three-tangles. Moreover, we show that the standard GHZ state and the standard W state have the maximal values of the minimal control power on the two classes, respectively. This means that the minimal control power can be interpreted as not only an operational quantity of a multi-partite quantum communication but also a degree of multi-partite entanglement.

  11. Options for Control of Reactive Power by Distributed Photovoltaic Generators

    E-Print Network [OSTI]

    Petr Sulc; Konstantin Turitsyn; Scott Backhaus; Michael Chertkov

    2010-08-04

    High penetration levels of distributed photovoltaic(PV) generation on an electrical distribution circuit present several challenges and opportunities for distribution utilities. Rapidly varying irradiance conditions may cause voltage sags and swells that cannot be compensated by slowly responding utility equipment resulting in a degradation of power quality. Although not permitted under current standards for interconnection of distributed generation, fast-reacting, VAR-capable PV inverters may provide the necessary reactive power injection or consumption to maintain voltage regulation under difficult transient conditions. As side benefit, the control of reactive power injection at each PV inverter provides an opportunity and a new tool for distribution utilities to optimize the performance of distribution circuits, e.g. by minimizing thermal losses. We discuss and compare via simulation various design options for control systems to manage the reactive power generated by these inverters. An important design decision that weighs on the speed and quality of communication required is whether the control should be centralized or distributed (i.e. local). In general, we find that local control schemes are capable for maintaining voltage within acceptable bounds. We consider the benefits of choosing different local variables on which to control and how the control system can be continuously tuned between robust voltage control, suitable for daytime operation when circuit conditions can change rapidly, and loss minimization better suited for nighttime operation.

  12. DOE's Hydrogen Fuel Cell Activities: Developing Technology and Validating it through Real-World Evaluation (Presentation)

    SciTech Connect (OSTI)

    Wipke, K.; Sprik, S.; Kurtz, J.; Garbak, J.

    2008-05-12

    Presentation prepared for the May 12, 2008 Alternative Fuels and Vehicles Conference that describes DOE's current hydrogen fuel cell technology validation projects.

  13. A Workflow for Parameter Calibration and and Model Validation in SST: Interim Report.

    SciTech Connect (OSTI)

    Pebay, Philippe Pierre; Wilke, Jeremiah J; Sargsyan, Khachik

    2014-12-01

    This brief report explains the method used for parameter calibration and model validation in SST/Macro and the set of tools and workflow developed for this purpose.

  14. Model Validation at the 204-MW New Mexico Wind Energy Center

    SciTech Connect (OSTI)

    Muljadi, E.; Butterfield, C. P.; Ellis, A.; Mechenbier, J.; Hochheimer, J.; Young, R.; Miller, N.; Delmerico, R.; Zavadil, R.; Smith, J. C.

    2006-06-01

    Poster for WindPower 2006 held June 4-7, 2006, in Pittsburgh, PA, describing model validation at the 204-MW New Mexico Wind Energy Center.

  15. Quantum feedback control and classical control theory

    E-Print Network [OSTI]

    Andrew C. Doherty; Salman Habib; Kurt Jacobs; Hideo Mabuchi; Sze M. Tan

    2000-03-09

    We introduce and discuss the problem of quantum feedback control in the context of established formulations of classical control theory, examining conceptual analogies and essential differences. We describe the application of state-observer based control laws, familiar in classical control theory, to quantum systems and apply our methods to the particular case of switching the state of a particle in a double-well potential.

  16. Quantum Control Theory

    E-Print Network [OSTI]

    Matthew James

    2014-06-20

    This paper explains some fundamental ideas of {\\em feedback} control of quantum systems through the study of a relatively simple two-level system coupled to optical field channels. The model for this system includes both continuous and impulsive dynamics. Topics covered in this paper include open and closed loop control, impulsive control, optimal control, quantum filtering, quantum feedback networks, and coherent feedback control.

  17. Radio Frequency Interference Validation Testing for LAAS using the

    E-Print Network [OSTI]

    Stanford University

    of a LAAS Ground Facility (LGF) that is composed of various monitors to detect possible hazardous anomalies Controller (AGC) outputs from the IMT receivers are sensitive to interference but are not sensitive to other types of failures. In addition to being more sensitive to changes in RFI, they provide a useful metric

  18. Experimental Validation of the Multi-Isotope Process Monitor Concept

    SciTech Connect (OSTI)

    Orton, Christopher R.; Schwantes, Jon M.; Fraga, Carlos G.; Douglas, Matthew; Christensen, Richard

    2010-05-13

    Researchers from Pacific Northwest National Laboratory, in conjunction with personnel from The Ohio State University, are working to develop a system for monitoring spent nuclear fuel reprocessing facilities on-line, non-destructively, and in near-real-time. This method, known as the Multi-Isotope Process (MIP) Monitor, is based upon the measurement of distribution patterns of a suite of indicator (radioactive) isotopes present within particular process streams. Distribution patterns, monitored on-line by gamma spectrometry, are then compared in near-real-time to patterns representing "normal" process conditions using multivariate pattern recognition software. By targeting gamma-emitting indicator isotopes, the MIP Monitor approach is compatible with the use of small, portable, high-resolution gamma detectors that may be easily deployed throughout the facility. In addition, utilization of a suite of radio-elements, including ones with multiple oxidation states, increases the likelihood that attempts to divert material via process manipulation would be detected. Proof-of-principle modeling exercises simulating changes in acid strength have been completed and the results are promising. Laboratory validation is currently under way and significant results are available. The latest experimental results, along with an overview of the method will be presented.

  19. Computational Design and Experimental Validation of New Thermal Barrier Systems

    SciTech Connect (OSTI)

    Guo, Shengmin; Yang, Shizhong; Khosravi, Ebrahim

    2011-12-31

    This project (10/01/2010-9/30/2013), “Computational Design and Experimental Validation of New Thermal Barrier Systems”, originates from Louisiana State University (LSU) Mechanical Engineering Department and Southern University (SU) Department of Computer Science. This proposal will directly support the technical goals specified in DE-FOA-0000248, Topic Area 3: Turbine Materials, by addressing key technologies needed to enable the development of advanced turbines and turbine-based systems that will operate safely and efficiently using coal-derived synthesis gases. We will develop novel molecular dynamics method to improve the efficiency of simulation on novel TBC materials; we will perform high performance computing (HPC) on complex TBC structures to screen the most promising TBC compositions; we will perform material characterizations and oxidation/corrosion tests; and we will demonstrate our new Thermal barrier coating (TBC) systems experimentally under Integrated gasification combined cycle (IGCC) environments. The durability of the coating will be examined using the proposed High Temperature/High Pressure Durability Test Rig under real syngas product compositions.

  20. Radiative transfer model for contaminated slabs : experimental validations

    E-Print Network [OSTI]

    Andrieu, François; Schmitt, Bernard; Douté, Sylvain; Brissaud, Olivier

    2015-01-01

    This article presents a set of spectro-goniometric measurements of different water ice samples and the comparison with an approximated radiative transfer model. The experiments were done using the spectro-radiogoniometer described in Brissaud et al. (2004). The radiative transfer model assumes an isotropization of the flux after the second interface and is fully described in Andrieu et al. (2015). Two kind of experiments were conducted. First, the specular spot was closely investigated, at high angular resolution, at the wavelength of $1.5\\,\\mbox{\\mu m}$, where ice behaves as a very absorbing media. Second, the bidirectional reflectance was sampled at various geometries, including low phase angles on 61 wavelengths ranging from $0.8\\,\\mbox{\\mu m}$ to $2.0\\,\\mbox{\\mu m}$. In order to validate the model, we made a qualitative test to demonstrate the relative isotropization of the flux. We also conducted quantitative assessments by using a bayesian inversion method in order to estimate the parameters (e.g. sampl...