Powered by Deep Web Technologies
Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Complete LNG Terminal Status Maps | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LNG Terminal Status Maps Complete LNG Terminal Status Maps A series of slides showing the status of various LNG terminals (existing, under construction, proposed, etc.) in North...

2

National Ignition Facility Project Completion and Control System Status  

SciTech Connect

The National Ignition Facility (NIF) is the world's largest and most energetic laser experimental system providing a scientific center to study inertial confinement fusion (ICF) and matter at extreme energy densities and pressures. Completed in 2009, NIF is a stadium-sized facility containing a 1.8-MJ, 500-TW 192-beam ultraviolet laser and target chamber. A cryogenic tritium target system and suite of optical, X-ray and nuclear diagnostics will support experiments in a strategy to achieve fusion ignition starting in 2010. Automatic control of NIF is performed by the large-scale Integrated Computer Control System (ICCS), which is implemented by 2 MSLOC of Java and Ada running on 1300 front-end processors and servers. The ICCS framework uses CORBA distribution for interoperation between heterogeneous languages and computers. Laser setup is guided by a physics model and shots are coordinated by data-driven distributed workflow engines. The NIF information system includes operational tools and a peta-scale repository for provisioning experimental results. This paper discusses results achieved and the effort now underway to conduct full-scale operations and prepare for ignition.

Van Arsdall, P J; Azevedo, S G; Beeler, R G; Bryant, R M; Carey, R W; Demaret, R D; Fisher, J M; Frazier, T M; Lagin, L J; Ludwigsen, A P; Marshall, C D; Mathisen, D G; Reed, R K

2009-10-02T23:59:59.000Z

3

Microsoft Word - 10.15.2013 Status Report.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

Vacancy Announcement Status Report, Updated 10152013 Vacancy Position PPSeriesGrade Organization Status Specialist DOE-NETL-13- DE-008 Chief Financial Officer & Business...

4

Vacancies | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Field Offices Contact Us Vacancies Interested candidates can apply to the following Office of the Inspector General job opportunities at: http:www.usajobs.gov . USAJOBS is...

5

Vacancies in fully hydrogenated boron nitride layer: implications for functional nanodevices  

SciTech Connect

Using density functional theory, a series of calculations of structural and electronic properties of hydrogen vacancies in a fully hydrogenated boron nitride (fH-BN) layer were conducted. By dehydrogenating the fH-BN structure, B-terminated vacancies can be created which induce complete spin polarization around the Fermi level, irrespective of the vacancy size. On the contrary, the fH-BN structure with N-terminated vacancies can be a small-gap semiconductor, a typical spin gapless semiconductor, or a metal depending on the vacancy size. Utilizing such vacancy-induced band gap and magnetism changes, possible applications in spintronics are proposed, and a special fH-BN based quantum dot device is designed.

Zhou, Yungang; Wang, Zhiguo; Nie, JL; Yang, Ping; Sun, Xin; Khaleel, Mohammad A.; Zu, Xiaotao; Gao, Fei

2012-03-01T23:59:59.000Z

6

Calculation of the electron structure of vacancies and their compensated states in III-VI semiconductors  

Science Conference Proceedings (OSTI)

The Green's functions theory and the bond-orbital model are used as a basis for calculations of the electron structure of local defects-specifically, vacancies and their compensated states in III-VI semiconductors. The energy levels in the band gap are established, and the changes induced in the electron densities in the GaS, GaSe, and InSe semiconductors by anion and cation vacancies and their compensated states are calculated. It is established that, if a vacancy is compensated by an atom of an element from the same subgroup with the same tetrahedral coordination and if the ionic radius of the compensating atom is smaller than that of the substituted atom, the local levels formed by the vacancy completely disappear. It is shown that this mechanism of compensation of vacancies provides a means not only for recovering the parameters of the crystal, but for improving the characteristics of the crystal as well.

Mehrabova, M. A., E-mail: Mehrabova@mail.ru; Madatov, R. S. [Azerbaijan National Academy of Sciences, Institute of Radiation Problems (Azerbaijan)

2011-08-15T23:59:59.000Z

7

Status  

NLE Websites -- All DOE Office Websites (Extended Search)

9 FOIA - Request Log 9 FOIA - Request Log 1 Closed/ Date No. Dated Date Rec'd HQ or Dir. Subject Finalized 05/19/09 001 04/07/09 04/07/09 Direct Current contracts with Visionary Solutions, LLC and CAST Specialty Transportation Incorporated, for transportation services for the Waste Isolation Pilot Plant (WIPP) Finalized 06/30/09 002 06/29/09 06/29/09 Transfer DOE/HQ (1) All documents dated from February 2001 to the present relating or referring to any labor disputes that have delayed completion of federal construction projects costing $25 million or more during the time period referenced above. (2) All documents dated from February 2001 to the present relating or referring to any difficulties asserted by contractors in predicting labor cost and/or interruptions

8

The free energy of vacancy pairs  

Science Conference Proceedings (OSTI)

The configurational free energy change ?A 2/k T associated with the introduction of pairs of vacancy defects into a two?dimensional triangular lattice with nearest neighbor interactions is calculated by lattice dynamics in the classical high temperature limit. It is found that second and third nearest neighbor vacancies yield the greatest decrease in the free energy.

Robert Cook; Alan Shuldiner

1978-01-01T23:59:59.000Z

9

Method for providing oxygen ion vacancies in lanthanide oxides  

DOE Patents (OSTI)

A method for desulfurization of fuel gases resulting from the incomplete combustion of sulfur containing hydrocarbons whereby the gases are treated with lanthanide oxides containing large numbers of oxygen-ion vacancies providing ionic porosity which enhances the ability of the lanthanide oxides to react more rapidly and completely with the sulfur in the fuel gases whereby the sulfur in such gases is reduced to low levels suitable for fuels for firing into boilers of power plants generating electricity with steam turbine driven generators, gas turbines, fuel cells and precursors for liquid fuels such as methanol and the like.

Kay, D. Alan R. (4305 Lakeshore Rd., Burlington, CA); Wilson, William G. (820 Harden Dr., Pittsburgh, PA 15229)

1989-12-05T23:59:59.000Z

10

Thermal vacancies in close-packing solids  

E-Print Network (OSTI)

Based on Stillinger's version of cell cluster theory, we derive an expression for the equilibrium concentration of thermal monovacancies in solids which allows for a transparent interpretation of the vacancy volume and the energetic/entropic part in the corresponding Gibbs energy of vacancy formation $\\Delta G_{\\rm v}$. For the close--packing crystals of the hard sphere and Lennard--Jones model systems very good agreement with simulation data is found. Application to metals through the embedded--atom method (EAM) reveals a strong sensitivity of the variation of $\\Delta G_{\\rm v}$ with temperature to details of the EAM potential. Our truncation of the cell cluster series allows for an approximate, but direct measurement of crystal free energies and vacancy concentration in colloidal model systems using laser tweezers.

Mostafa Mortazavifar; Martin Oettel

2013-11-20T23:59:59.000Z

11

The free energy of a vacancy  

Science Conference Proceedings (OSTI)

The configurational free energy change ?A/k T associated with the introduction of a vacancy defect into a two?dimensional triangular lattice with nearest neighbor interactions is calculated by lattice dynamics in the classical high temperature limit and found to be ?1.6800.002.

Robert Cook; David Negri

1977-01-01T23:59:59.000Z

12

Vacancy Mechanism Davydov I.А.  

National Nuclear Security Administration (NNSA)

9: Computational Physics-MD 9: Computational Physics-MD DFT and MD Simulation of Self-Diffusion in Silicon: Study of Diffusion Vacancy Mechanism Davydov I.А. * , Anisin А.V. † , Eliseev G.М. ‡ , Kopkin S.V. § , and Reese Jones ** *, †, ‡, § Russian Federal Nuclear Center - All-Russia Research Institute of Experimental Physics (RFNC-VNIIEF), 607190 Sarov, Mira-37, Russia ** Sandia National Laboratories, MS 9404, P.O. Box 0969, Livermore, CA 94551, USA Summary: Computations of jump activation energy DH j and diffusion jump frequency n have been carried out using the Density Functional Theory (DFT) and Molecular Dynamics (MD) method for a single crystal of Si. These parameters define the rate of vacancy diffusion transport.

13

Completed DOE Technical Standards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Completed) Completed) Project Number Title Document ID SLM / ORG Author / Phone / Email Status / Review Date P1020-2002REV National Phenomena hazards Design and Evaluation Criteria for DOE Facilities DOE-STD-1020-2012 James O'Brien (HS-30) P1066-1999REV Fire Protection and Emergency Services Program and Design Criteria (revision to DOE-STD-1066-99) DOE-STD-1066-2012 James O'Brien (HS-30)

14

Completion technology  

SciTech Connect

This article reports that current economic conditions in the oil patch have provided a climate for continuous search for more economical completion designs and tools. Aside from more cost-effective completion tools, there are several ways to reduce related costs. For example, inadequate communication of technical requirements between operator and service company results in a tremendous amount of needless expense. This article explains the concerns of completion tool manufacturers and service companies so operating companies can better understand their required inputs and internal workings. The essence of the article is that well completion and production costs can be improved through better communication.

Longbottom, J.R.

1987-01-01T23:59:59.000Z

15

Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide...  

NLE Websites -- All DOE Office Websites (Extended Search)

Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers Print Low-dimensional materials have gained much attention not only because of the nonstop march toward...

16

Strain Relaxation and Vacancy Creation in Thin Platinum Films  

Science Conference Proceedings (OSTI)

Synchrotron based combined in situ x-ray diffractometry and reflectometry is used to investigate the role of vacancies for the relaxation of residual stress in thin metallic Pt films. From the experimentally determined relative changes of the lattice parameter a and of the film thickness L the modification of vacancy concentration and residual strain was derived as a function of annealing time at 130 deg. C. The results indicate that relaxation of strain resulting from compressive stress is accompanied by the creation of vacancies at the free film surface. This proves experimentally the postulated dominant role of vacancies for stress relaxation in thin metal films close to room temperature.

Gruber, W.; Chakravarty, S.; Schmidt, H. [Technische Universitaet Clausthal, Institut fuer Metallurgie, Clausthal-Zellerfeld (Germany); Baehtz, C. [Helmholtz Zentrum Dresden Rossendorf, Institute of Ion Beam Physics and Materials Research, Dresden (Germany); Leitenberger, W. [Universitaet Potsdam, Institut fuer Physik und Astronomie, Potsdam (Germany); Bruns, M. [Karlsruher Institut fuer Technologie, Institute for Applied Materials, Eggenstein-Leopoldshafen (Germany); Karlsruher Institut fuer Technologie, Karlsruher Micro Nano Facility, Eggenstein-Leopoldshafen (Germany); Kobler, A.; Kuebel, C. [Karlsruher Institut fuer Technologie, Institute of Nanotechnology, Eggenstein-Leopoldshafen (Germany); Karlsruher Institut fuer Technologie, Karlsruher Micro Nano Facility, Eggenstein-Leopoldshafen (Germany)

2011-12-23T23:59:59.000Z

17

Guidance_Application_Federal_Vacancies_Reform_Act_1998.pdf |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

nceApplicationFederalVacanciesReformAct1998.pdf More Documents & Publications Intelligence Reform and Terroroism Prevention Act - December 17, 2004 Bond Amendment, Security...

18

COMPLETE LISTING:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COMPLETE LISTING: COMPLETE LISTING: DISPOSITION AUTHORITIES FROZEN UNDER THE EPIDEMIOLOGICAL MORATORIUM MARCH 2008 Listed below are all the disposition authorities which are under the moratorium on the destruction of health related records as of March 2008. All records scheduled under these authorities at Department of Energy (DOE) headquarters and field sites should be preserved past their normal retention periods unless an headquarters organization or a field site has obtained permission to remove records scheduled under the authority from the moratorium. Questions about the moratorium and what records should be preserved under it should be directed to Marsha Lawn on 301-903-3721 or at Marsha.Lawn@hq.doe.gov. ENVIRONMENTAL RECORDS SCHEDULE Item Series Title

19

GUIDANCE ON APPLICATION OF FEDERAL VACANCIES REFORM ACT OF 1998 Page 1 of 13  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APPLICATION OF FEDERAL VACANCIES REFORM ACT OF 1998 Page 1 of 13 APPLICATION OF FEDERAL VACANCIES REFORM ACT OF 1998 Page 1 of 13 GUIDANCE ON APPLICATION OF FEDERAL VACANCIES REFORM ACT OF 1998 This memorandum provides guidance on the application of the Federal Vacancies Reform Act of1998 to vacancies in Senate-confirmed offices within the executive branch. March 22, 1999 MEMORANDUM FOR AGENCY GENERAL COUNSELS On October 21, 1998, the Federal Vacancies Reform Act of 1998 ("Vacancies Reform Act" or "Act") was signed into law. ( ) The Vacancies Reform Act replaces the old Vacancies Act and alters the way in which vacancies in presidentially appointed, Senate- confirmed offices within the executive branch may be filled on a temporary basis. The following Q&As are intended to provide general guidance on the Vacancies Reform Act. If

20

Completed EISs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Completed EISs Completed EISs Number of EISs in report: 294 Number Title Prog Office Ops Office Federal Register Notices Notice Date Citation Agency Areva Eagle Rock Enrichment Facility, Bonneville County, Idaho (Adopted) LP DOE/EIS-0471 5/20/2011 EPA 76 FR 29240 Adopted American Centrifuge Plant in Piketon, Pike County, Ohio (Adopted) LP DOE/EIS-0468 5/20/2011 EPA 76 FR 29240 Adopted Cushman Hydroelectric Project, Mason County, Washington (Adopted) EE DOE/EIS-0456 10/8/2010 EPA 75 FR 62386 NOA FEIS 11/29/2010 DOE 75 FR 73059 ROD Genesis Solar Energy Project, California (also identified as NextEra - Ford Dry Lake Solar Project) (Adopted) LP DOE/EIS-0455 11/23/2009 BLM 74 FR 61167 NOI 4/9/2010 BLM 75 FR 18204 NOA DEIS 8/27/2010 EPA 75 FR 52736 NOA FEIS 8/30/2010 BLM 75 FR 52966 NOA FEIS 12/17/2010 EPA 75 FR 78992

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers  

NLE Websites -- All DOE Office Websites (Extended Search)

Vacancy-Induced Nanoscale Wire Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers Print Wednesday, 21 December 2005 00:00 Low-dimensional materials have gained much attention not only because of the nonstop march toward miniaturization in the electronics industry but also for the exotic properties that are inherent in their small size. One approach for creating low-dimensional structures is to exploit the nanoscale or atomic-scale features that exist naturally in the three-dimensional (bulk) form of materials. By this means, a group from the University of Washington has demonstrated a new way of creating one-dimensional nanoscale structures (nanowires) in the compound gallium selenide. In short, ordered lines of structural vacancies in the material stimulate the growth of "one-dimensional" structures less than 1 nanometer in width.

22

Hydrogen-Vacancy Interactions in Fe-C Alloys  

E-Print Network (OSTI)

Energetics and concentrations of hydrogen-containing point defect clusters (PDCs) in Fe-C alloys are calculated and cast into a PDC dominance diagram. Because of the strong binding effects of iron vacancies on the stability ...

Yip, Sidney

23

Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers  

NLE Websites -- All DOE Office Websites (Extended Search)

Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers Print Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers Print Low-dimensional materials have gained much attention not only because of the nonstop march toward miniaturization in the electronics industry but also for the exotic properties that are inherent in their small size. One approach for creating low-dimensional structures is to exploit the nanoscale or atomic-scale features that exist naturally in the three-dimensional (bulk) form of materials. By this means, a group from the University of Washington has demonstrated a new way of creating one-dimensional nanoscale structures (nanowires) in the compound gallium selenide. In short, ordered lines of structural vacancies in the material stimulate the growth of "one-dimensional" structures less than 1 nanometer in width.

24

Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers  

NLE Websites -- All DOE Office Websites (Extended Search)

Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers Print Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers Print Low-dimensional materials have gained much attention not only because of the nonstop march toward miniaturization in the electronics industry but also for the exotic properties that are inherent in their small size. One approach for creating low-dimensional structures is to exploit the nanoscale or atomic-scale features that exist naturally in the three-dimensional (bulk) form of materials. By this means, a group from the University of Washington has demonstrated a new way of creating one-dimensional nanoscale structures (nanowires) in the compound gallium selenide. In short, ordered lines of structural vacancies in the material stimulate the growth of "one-dimensional" structures less than 1 nanometer in width.

25

Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers  

NLE Websites -- All DOE Office Websites (Extended Search)

Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers Print Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide Layers Print Low-dimensional materials have gained much attention not only because of the nonstop march toward miniaturization in the electronics industry but also for the exotic properties that are inherent in their small size. One approach for creating low-dimensional structures is to exploit the nanoscale or atomic-scale features that exist naturally in the three-dimensional (bulk) form of materials. By this means, a group from the University of Washington has demonstrated a new way of creating one-dimensional nanoscale structures (nanowires) in the compound gallium selenide. In short, ordered lines of structural vacancies in the material stimulate the growth of "one-dimensional" structures less than 1 nanometer in width.

26

FORECAST OF VACANCIES Until mid -2014 (Issue No.19)  

E-Print Network (OSTI)

; · Computer skills: standard Microsoft Office software; · Languages: Fluency in English. Working knowledge: standard Microsoft Office software; · Languages: Fluency in English. Working knowledge of other official REQUIREMENTS / ROLE EXPECTED DATE OF VACANCY Offices reporting to the Director General Senior Programme

Ohta, Shigemi

27

Molecular dynamics simulation of interaction of H with vacancy in W  

DOE Green Energy (OSTI)

Molecular dynamics simulations were performed to investigate the interaction between H and vacancy in W using an analytical bond-order potential to describe the interactions between W-W, W-H and H-H. The most stable configuration for H in W is the tetrahedron interstitial site. We calculated the binding energies of an H and a vacancy to an H-vacancy cluster (HnVm) in W, respectively, where n and m ranged from 0 to 10. The binding energy was almost unchanged. The binding energy of a vacancy to H-vacancy cluster is about 0.4eV, which is higher than the binding energy of an H to H-vacancy cluster. Vacancy is much easier to binding with H-vacancy cluster than H. And H is easier to stay in the tetrahedron interstitial site or octahedron interstitial site in bcc W.

Li, Xiaochun; Gao, Fei; Lu, Guang-Hong

2009-09-15T23:59:59.000Z

28

Precipitate Dissolution and Gettering under Vacancy Injection in Silicon: Final Subcontract Report, 21 March 2006 - 15 January 2008  

DOE Green Energy (OSTI)

This paper summarizes the mechanisms of vacancy injection, radiation-enhanced solubility, and radiation-enhanced diffusion of vacancies and metal impurity atoms in silicon.

Tan, T. Y.; Li, N.

2008-09-01T23:59:59.000Z

29

Live Status  

NLE Websites -- All DOE Office Websites (Extended Search)

For Users For Users Live Status Global Queue Look Scheduled Outages Outage Log Edison Login Node Status Hopper Login Node Status Hopper User Environment Monitoring Carver Login Node Status PDSF Login Node Status PDSF Monitoring Science Gateway Status Now Computing Highlights My NERSC Getting Started Computational Systems Data & File Systems Network Connections Queues and Scheduling Job Logs & Analytics Training & Tutorials Software Accounts & Allocations Policies Data Analytics & Visualization Data Management Policies Science Gateways User Surveys NERSC Users Group User Announcements Help Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612

30

Numerical Modeling of the Stability of Face-Centered Cubic Metals with High Vacancy Concentration  

DOE Green Energy (OSTI)

The objective of this research is to assess the possibility of forming an atomically porous structure in a low-density metal, e.g., Al with vacancies up to 0.20/lattice site; and to examine the effects of hydrogen and vacancy concentration on the stability of an atomically porous structure that has been experimentally produced in nickel. The approach involves numerical modeling using the Embedded-Atom Method (EAM). High vacancy concentrations cause the Al lattice to disorder at 300K. In contrast, Ni retains the face-centered-cubic structure at 300K for vacancy concentrations up to 0.15 Vac/lattice site. Unexpectedly, the lattice with 0.15 Vac/lattice site is more stable than the lattice with 0.10 or 0.20 Vac/lattice site. The Ni systems with 0.10 and 0.15 Vac/lattice site exhibit domains consisting of uniform lattice rotations. The Ni lattice with 0.15 Vac/lattice site is more stable with an initial distribution of random vacancies compared to ordered vacancies. The equilibrium lattice structures of Ni a d Al containing vacancies and H are less ordered to structures with vacancies only at 300K.

Brian P. Somerday; M. I. Baskes

1998-12-01T23:59:59.000Z

31

Active code completion  

Science Conference Proceedings (OSTI)

Code completion menus have replaced standalone API browsers for most developers because they are more tightly integrated into the development workflow. Refinements to the code completion menu that incorporate additional sources of information have similarly ...

Cyrus Omar; YoungSeok Yoon; Thomas D. LaToza; Brad A. Myers

2012-06-01T23:59:59.000Z

32

Magnetically active vacancy related defects in irradiated GaN layers  

Science Conference Proceedings (OSTI)

We present the studies of magnetic properties of 2 MeV {sup 4}He{sup +}-irraadiated GaN grown by metal-organic chemical-vapor deposition. Particle irradiation allowed controllable introduction of Ga-vacancy in the samples. The magnetic moments with concentrations changing between 4.3 and 8.3 Multiplication-Sign 10{sup 17}cm{sup -3} showing superparamagnetic blocking at room temperature are observed. The appearance of clear hysteresis curve at T=5K with coercive field of about H{sub C} Almost-Equal-To 270 Oe suggests that the formation of more complex Ga vacancy related defects is promoted with increasing Ga vacancy content. The small concentration of the observed magnetically active defects with respect to the total Ga-vacancy concentration suggests that the presence of the oxygen/hydrogen-related vacancy complexes is the source of the observed magnetic moments.

Kilanski, L.; Tuomisto, F. [Department of Applied Physics, Aalto University, P.O. Box 11100, FI-00076 Aalto Espoo (Finland); Szymczak, R. [Institute of Physics, Polish Academy of Sciences, Al. Lotnikow 32/46, 02-668 Warsaw (Poland); Kruszka, R. [Institute of Electron Technology, Al. Lotnikow 46, 02-668 Warsaw (Poland)

2012-08-13T23:59:59.000Z

33

Completed Sites Listing  

Energy.gov (U.S. Department of Energy (DOE))

As of fiscal year 2012, EM (and its predecessor organization UMTRA) completed cleanup and closed 90 sites in 24 states.

34

Live Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Global Queue Look Scheduled Outages Outage Log Edison Login Node Status Hopper Login Node Status Hopper User Environment Monitoring Carver Login Node Status PDSF Login Node Status PDSF Monitoring Science Gateway Status Now Computing Highlights My NERSC Getting Started Computational Systems Data & File Systems Network Connections Queues and Scheduling Job Logs & Analytics Training & Tutorials Software Accounts & Allocations Policies Data Analytics & Visualization Data Management Policies Science Gateways User Surveys NERSC Users Group User Announcements Help Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612 Consulting http://help.nersc.gov

35

Science Gateway Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Global Queue Look Scheduled Outages Outage Log Edison Login Node Status Hopper Login Node Status Hopper User Environment Monitoring Carver Login Node Status PDSF Login Node Status...

36

Ultraviolet Complete Quantum Gravity  

E-Print Network (OSTI)

An ultraviolet complete (UV) quantum gravity theory is formulated in which vertex functions in Feynman graphs are entire functions and the propagating gravitons are described by local, causal propagators. A scalar-tensor action describes classical gravity theory. The cosmological constant problem is investigated in the context of the UV complete quantum gravity.

Moffat, J W

2010-01-01T23:59:59.000Z

37

Complete Safety Training  

NLE Websites -- All DOE Office Websites (Extended Search)

Complete Safety Training Print Complete Safety Training Print All users are required to take safety training before they may begin work at the ALS. It is the responsibility of the Principal Investigator and the Experimental Lead to ensure that all members of the team receive proper safety training before an experiment begins. Special consideration is available for NSLS users who have completed, and are up-to-date with, their safety training, NSLS Safety Module; they may take a brief equivalency course ALS 1010: Site-Specific Safety at the ALS in lieu of the complete safety training in ALS 1001: Safety at the ALS. These users must present documentation upon arrival at the ALS showing that they have completed NSLS Safety Module; see Acceptable NSLS Safety Documentation for examples.

38

Complete Safety Training  

NLE Websites -- All DOE Office Websites (Extended Search)

Complete Safety Training Print Complete Safety Training Print All users are required to take safety training before they may begin work at the ALS. It is the responsibility of the Principal Investigator and the Experimental Lead to ensure that all members of the team receive proper safety training before an experiment begins. Special consideration is available for NSLS users who have completed, and are up-to-date with, their safety training, NSLS Safety Module; they may take a brief equivalency course ALS 1010: Site-Specific Safety at the ALS in lieu of the complete safety training in ALS 1001: Safety at the ALS. These users must present documentation upon arrival at the ALS showing that they have completed NSLS Safety Module; see Acceptable NSLS Safety Documentation for examples.

39

Complete Safety Training  

NLE Websites -- All DOE Office Websites (Extended Search)

Complete Safety Training Print Complete Safety Training Print All users are required to take safety training before they may begin work at the ALS. It is the responsibility of the Principal Investigator and the Experimental Lead to ensure that all members of the team receive proper safety training before an experiment begins. Special consideration is available for NSLS users who have completed, and are up-to-date with, their safety training, NSLS Safety Module; they may take a brief equivalency course ALS 1010: Site-Specific Safety at the ALS in lieu of the complete safety training in ALS 1001: Safety at the ALS. These users must present documentation upon arrival at the ALS showing that they have completed NSLS Safety Module; see Acceptable NSLS Safety Documentation for examples.

40

Performance of Second 50 Completed ATP Projects Status ...  

Science Conference Proceedings (OSTI)

... the customers who would respond to the lower prices, and determine what ... projected from current records using projective visualization (PV), a new ...

2008-07-28T23:59:59.000Z

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Performance of Second 50 Completed ATP Projects Status ...  

Science Conference Proceedings (OSTI)

... high-quality care throughout a patient's lifetime. ... a successful project (tremendous cost savings spread ... in 1995 included standalone kiosks, wireless ...

2008-07-28T23:59:59.000Z

42

Status,Series,Publication # (complete),Publication # (main) ...  

Science Conference Proceedings (OSTI)

... including hostile cyber attacks, natural disasters, structural failures ... System Contingency Plan; Incident Response Plan; Disaster Recovery Plan ...

2013-10-31T23:59:59.000Z

43

Status,Series,Publication # (complete),Publication # (main) ...  

Science Conference Proceedings (OSTI)

... XP Home Edition computers within home offices for their ... the standard was minimally restructured to: standardize ... 1998 by the Office of Management ...

2014-01-02T23:59:59.000Z

44

Status,Series,Publication # (complete),Publication # (main) ...  

Science Conference Proceedings (OSTI)

... Markup Language; healthcare IT; Health Insurance Portability and ... Act; HIPAA; privilege management; RAdAC; Risk-Adaptable Access ...

2013-09-26T23:59:59.000Z

45

Performance of Second 50 Completed ATP Projects Status ...  

Science Conference Proceedings (OSTI)

... ie, logic and evolution) models accommodated by the ... included a distributed agent-based platform for ... to use a distributed function model versus the ...

2008-07-28T23:59:59.000Z

46

Performance of the Third 50 Completed ATP Projects Status ...  

Science Conference Proceedings (OSTI)

... listed is sorted in descending order of performance rating, then by ... on "a unique national measurement facility for soft X-ray absorption spectroscopy ...

2007-07-24T23:59:59.000Z

47

Complete Urban Surface Temperatures  

Science Conference Proceedings (OSTI)

An observation program using ground and airborne thermal infrared radiometers is used to estimate the surface temperature of urban areas, taking into account the total active surface area. The authors call this the complete urban surface ...

J. A. Voogt; T. R. Oke

1997-09-01T23:59:59.000Z

48

Making abstract interpretations complete  

Science Conference Proceedings (OSTI)

Completeness is an ideal, although uncommon, feature of abstract interpretations, formalizing the intuition that, relatively to the properties encoded by the underlying abstract domains, there is no loss of information accumulated in abstract computations. ...

Roberto Giacobazzi; Francesco Ranzato; Francesca Scozzari

2000-03-01T23:59:59.000Z

49

SMARTS status  

NLE Websites -- All DOE Office Websites (Extended Search)

SMARTS INSTRUMENT STATUS SMARTS INSTRUMENT STATUS Instrument Status (Last updated: 2014/01/11 12:06:58) Run Number: 87401 Title: Sample1 Pretested [4.06,150.00,-0.75,45.00] Run Status: running Last Script Activity: 2014/01/11 11:52:36: Start run 87401; mah 1200000 move 4.06 150.00 -0.75 45.00 View full script Next Script Command: mah 1200000 move -0.75 120.00 -0.60 45.00 Proposal#: 4808 Sample#: 977 MAH: 837309 Monitor: 306052 Beam Current: 100 Shutter Status: OPEN Used disk space on /home: 52% Used disk space on /disk2: 74% Crate Status smartsdaq1 smartsdaq2 smartsdaq3 smartsdaq4 smartsdaq5 T0's in Run 16946 16959 16971 16984 16997 T0's Processed 16946 16959 16971 16984 16997 Events 726326 649097 794699 702610 3750460 Events/T0 42.86 38.27 46.83 41.37 220.65

50

Automation Status  

NLE Websites -- All DOE Office Websites (Extended Search)

NREL Manufacturing R&D Workshop NREL Manufacturing R&D Workshop NREL H2/FC Manufacturing R&D Workshop Automation Status Garry Sperrick garry@sperkllc.com 585-259-0311 August 11, 2011 Automation Status NREL Manufacturing R&D Workshop Presentation Overview ƒ Brief Introduction ƒ DOE / NREL - Review & Discussion ƒ Automation Platforms ƒ Automation Processes ƒ Automation Considerations of the Manufacturer ƒ Manufacturer and the Supplier ƒ Three (3) Automation Programs Following these Guidelines ƒ Automotive Component Manufacturing ƒ Medical Manufacturing ƒ Membrane Electrode Assembly Manufacturing ƒ Hypothetical Fuel Cell Manufacturing Platforms August 11, 2011 Automation Status NREL Manufacturing R&D Workshop Professional Bio ƒ Automation Technician - Mobil Chemical

51

Detachments of Complete Graphs  

Science Conference Proceedings (OSTI)

A detachment of a graph $G$ is formed by splitting each vertex into one or more subvertices, and sharing the incident edges arbitrarily among the subvertices. In this paper we consider the question of whether a graph $H$ is a detachment of some complete ...

Keith Edwards

2005-05-01T23:59:59.000Z

52

Effects of internal hydrogen on the vacancy loop formation probability in Al  

DOE Green Energy (OSTI)

The effect of internal hydrogen on the formation of vacancy dislocation loops from heavy-ion generated displacement cascades in Al has been investigated. Samples of high-purity aluminum and aluminum containing 900 and 1300 appM of hydrogen were irradiated at room temperature with 50 keV Kr+ ions. The ion dose rate was typically 2 {times} 10{sup 10}ions cm{sup {minus}2} sec{sup {minus}1} and the ion dose was between 10{sup 11} and 10{sup 13} ion cm{sup {minus}2}. Under these irradiation conditions, dislocation loops were observed in all compositions, although the formation probability was relatively low (less than 10 percent of the displacement cascades produced a vacancy loop). The loop formation probability was further reduced by the presence of hydrogen. No difference in the geometry or the size of the loops created in the hydrogen free and hydrogen charged samples was found. These results are difficult to interpret, and the explanation may lie in the distribution and form of the hydrogen. To account for the large hydrogen concentrations and from calculations of the energy associated with hydrogen entry into aluminum, it has been suggested that the hydrogen enters the aluminum lattice with an accompanying vacancy. This will create hydrogen-vacancy complexes in the material; two dimensional complexes have been detected in the hydrogen-charged, but unirradiated, samples by the small-angle x-ray scattering technique. The possibility of these complexes trapping the vacancies produced by the cascade process exists thus lowering the formation probability. However, such a mechanism must occur within the lifetime of the cascade. Alternatively, if a displacement cascade overlaps with the hydrogen-vacancy complexes, the lower atomic density of the region will result in an increase in the cascade volume (decrease in the local vacancy concentration) which will also reduce the loop formation probability.

Bui, T.X.; Sirois, E.; Robertson, I.M. (Illinois Univ., Urbana, IL (USA). Dept. of Materials Science and Engineering); Kirk, M.A. (Argonne National Lab., IL (USA))

1990-04-01T23:59:59.000Z

53

BNL | Completed ATF Experiments  

NLE Websites -- All DOE Office Websites (Extended Search)

Completed / Terminated ATF Experiments Completed / Terminated ATF Experiments AE01 - Micro-undulator FEL Experiment. Spokesperson: I. Ben-Zvi, BNL. (1992 - 1997) AE02. - Inverse FEL Accelerator. Spokesperson: A. van Steenbergen, BNL. [Yale, Columbia]. (1992-1997) AE03 - Laser Grating Accelerator Experiment. Spokesperson: R. Fernow, BNL. [Princeton, LANL]. (1992- 1996) AE05 - Nonlinear-Compton Scattering. Spokesperson: K. McDonald, Princeton (1992-) AE06 - Inverse Cherenkov Acceleration. Spokesperson: W. Kimura, STI Optronics. [UCSB,BNL]. (1992-1997) AE08 - Far Infrared Radiation Source. Spokesperson J. Walsh, Dartmouth. [Oxford, BNL]. (1992 - 1994) AE09. - Photocathode R&D. Spokesperson: T. Rao, BNL. (1992 - ) AE10. - High Gain Harmonic Generation FEL. Spokesperson: L.H. Yu, BNL. [ANL] (1992 - 2001)

54

Complete Experiment Safety Documentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Complete Experiment Safety Documentation Print Complete Experiment Safety Documentation Print User Safety Overview The steps for authorization of your experiment are described below. The ALS Experiment Coordinators are available to support you through this process. Please This e-mail address is being protected from spambots. You need JavaScript enabled to view it at any stage if you have questions or need more information. Prior to Your Arrival at the ALS 1. Complete or Update and Experiment Safety Sheet If you did not submit a General User Proposal, you must submit an ESS one month prior to arrival at the ALS. 2. Biological, Radioactive, Hazardous, and Electrical Materials, and Lasers If your experiment involves the use of any of the above materials-no matter how small the quantities are or how innocuous the sample may be-additional authorization may be required. Please submit your ESS early and clearly identify your materials. Our staff will assess the hazards and contact you about any necessary supplementary documentation.

55

Complete Experiment Safety Documentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Complete Experiment Safety Documentation Print Complete Experiment Safety Documentation Print User Safety Overview The steps for authorization of your experiment are described below. The ALS Experiment Coordinators are available to support you through this process. Please This e-mail address is being protected from spambots. You need JavaScript enabled to view it at any stage if you have questions or need more information. Prior to Your Arrival at the ALS 1. Complete or Update and Experiment Safety Sheet If you did not submit a General User Proposal, you must submit an ESS one month prior to arrival at the ALS. 2. Biological, Radioactive, Hazardous, and Electrical Materials, and Lasers If your experiment involves the use of any of the above materials-no matter how small the quantities are or how innocuous the sample may be-additional authorization may be required. Please submit your ESS early and clearly identify your materials. Our staff will assess the hazards and contact you about any necessary supplementary documentation.

56

Complete Experiment Safety Documentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Complete Experiment Safety Documentation Print Complete Experiment Safety Documentation Print User Safety Overview The steps for authorization of your experiment are described below. The ALS Experiment Coordinators are available to support you through this process. Please This e-mail address is being protected from spambots. You need JavaScript enabled to view it at any stage if you have questions or need more information. Prior to Your Arrival at the ALS 1. Complete or Update and Experiment Safety Sheet If you did not submit a General User Proposal, you must submit an ESS one month prior to arrival at the ALS. 2. Biological, Radioactive, Hazardous, and Electrical Materials, and Lasers If your experiment involves the use of any of the above materials-no matter how small the quantities are or how innocuous the sample may be-additional authorization may be required. Please submit your ESS early and clearly identify your materials. Our staff will assess the hazards and contact you about any necessary supplementary documentation.

57

Complete Experiment Safety Documentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Complete Experiment Safety Documentation Print Complete Experiment Safety Documentation Print User Safety Overview The steps for authorization of your experiment are described below. The ALS Experiment Coordinators are available to support you through this process. Please This e-mail address is being protected from spambots. You need JavaScript enabled to view it at any stage if you have questions or need more information. Prior to Your Arrival at the ALS 1. Complete or Update and Experiment Safety Sheet If you did not submit a General User Proposal, you must submit an ESS one month prior to arrival at the ALS. 2. Biological, Radioactive, Hazardous, and Electrical Materials, and Lasers If your experiment involves the use of any of the above materials-no matter how small the quantities are or how innocuous the sample may be-additional authorization may be required. Please submit your ESS early and clearly identify your materials. Our staff will assess the hazards and contact you about any necessary supplementary documentation.

58

Method for large-scale fabrication of atomic-scale structures on material surfaces using surface vacancies  

DOE Patents (OSTI)

A method for forming atomic-scale structures on a surface of a substrate on a large-scale includes creating a predetermined amount of surface vacancies on the surface of the substrate by removing an amount of atoms on the surface of the material corresponding to the predetermined amount of the surface vacancies. Once the surface vacancies have been created, atoms of a desired structure material are deposited on the surface of the substrate to enable the surface vacancies and the atoms of the structure material to interact. The interaction causes the atoms of the structure material to form the atomic-scale structures.

Lim, Chong Wee (Urbana, IL); Ohmori, Kenji (Urbana, IL); Petrov, Ivan Georgiev (Champaign, IL); Greene, Joseph E. (Champaign, IL)

2004-07-13T23:59:59.000Z

59

Current Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Current Status Current Status > Content on this page requires a newer version of Adobe Flash Player. Get Adobe Flash player July 31, 1942 The Army Corp of Engineers leases 1,025 acres of the Cook County Forest Preserve to build a research facility. November 1942 Under the direction of Enrico Fermi, a group of scientists at the University of Chicago begin building Chicago Pile-1 (CP-1). Security and secracy were essential. December 2, 1942 Enrico Fermi's team creates the world's first self-sustaining nuclear chain reaction using the CP-1 reactor under Stagg Field at the University of Chicago. CP-1 1943 The experiments under Stagg Field shut down, and the scientists move to a 19 acre section of the leased forest preserve, known as Site A. CP-1 is reconstructed and modified at Site A and renamed Chicago Pile 2 (CP-2).

60

Status of Wheeler Reservoir  

DOE Green Energy (OSTI)

This is one in a series of status reports prepared by the Tennessee Valley Authority (TVA) for those interested in the conditions of TVA reservoirs. This overview of Wheeler Reservoir summarizes reservoir purposes and operation, reservoir and watershed characteristics, reservoir uses and use impairments, and water quality and aquatic biological conditions. The information presented here is from the most recent reports, publications, and original data available. If no recent data were available, historical data were summarized. If data were completely lacking, environmental professionals with special knowledge of the resource were interviewed. 12 refs., 2 figs.

Not Available

1990-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Tevatron status  

Science Conference Proceedings (OSTI)

The Fermilab Tevatron is both the world's highest energy accelerator system and first large-scale superconducting synchrotron. Since Tevatron commissioning in July 1983, the accelerator has operated in 1984, 1985 and 1987 with extracted beams of 800 GeV for three runs of fixed target physics, and in 1987, and 1988, with proton-antiproton colliding beams at 900 /times/ 900 GeV. This paper will focus on the collider operation of the Tevatron: its present status and the outlook for its longer-term future evolution. 18 refs., 3 figs., 2 tabs.

Dugan, G.

1989-03-01T23:59:59.000Z

62

Working Paper 25 Skills Gaps and Hard to Fill Vacancies at  

E-Print Network (OSTI)

; in establishments in the private sector; and in establishments which make use of part time and temporary staff. Hard significant. Hard to fill vacancies are more likely in establishments which make use of part time in the private sector; and in establishments which made use of part time and temporary staff. By contrast, hard

Glasgow, University of

63

SOLID STATE NMR STUDY SUPPORTING THE LITHIUM VACANCY DEFECT MODEL IN CONGRUENT LITHIUM  

E-Print Network (OSTI)

@ Pergamon SOLID STATE NMR STUDY SUPPORTING THE LITHIUM VACANCY DEFECT MODEL IN CONGRUENT LITHIUM Nouember 1993; accepted I March 1994) Abstract-e3Nb and 7Li wideline- as well as MAS-NMR measurements were could be reduced to 0.6kHz by using MAS-NMR with a rotational lrequency of 4000Hz, thsre was no second 7

Bluemel, Janet

64

CPP Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Protection Program (CPP) Protection Program (CPP) Status FY10 Jeff Mauth Project Manager May 19, 2010 1 Agenda  Sensor Integration  Sensor Deployment  CPP Portal  Mercury  Parting Comments  Questions 2 Sensor Integration Task Lead: Greg Thomas  Flo and Flower: Session Data  Snort: Network Intrusion Detection Data  AMP: Various Types of Network Data  PopQuiz: Various Types of Network Data  T3: Data Movement and Sensor Control 3 Sensor Deployment Task Lead: Liz Faultersack Certification and Accreditation Continued Expansion Hardware Refresh to Begin FY11 9 CPP Portal Task lead: Brett Didier Features Sharing Policy Data and Releases 13 CPP Portal Provides DOE cyber analysts access to CPP collected "DOE enterprise" data

65

Code Completion From Abbreviated Input  

E-Print Network (OSTI)

Abbreviation Completion is a novel technique to improve the efficiency of code-writing by supporting code completion of multiple keywords based on non-predefined abbreviated input - a different approach from conventional ...

Miller, Robert C.

66

Status Company Terminal Term  

NLE Websites -- All DOE Office Websites (Extended Search)

Status of Short-Term Applications to Export Previously Imported LNG (as of March 5, 2013) Status Company Terminal Term (Years) Authorized Volume (Equivalent Bcf in natural gas)...

67

Propane Market Status Report  

Gasoline and Diesel Fuel Update (EIA)

Propane Market Status Report 07272000 Click here to start Table of Contents Propane Market Status Report Propane Prices Follow Crude Oil Propane Demand by Sector Demand Impacted...

68

Fundamentals of horizontal well completions  

Science Conference Proceedings (OSTI)

Oil and gas wells are drilled horizontally for a variety of reasons, chiefly to improve production without drilling multiple vertical wells and to prevent water or gas coning. Benefits of horizontal drilling are well documented. This article addresses the fundamentals of completing a horizontal well, discussing completion by (1) open hole, (2) casing packers, (3) slotted or perforated liner, and (4) cemented casing/liner. Completion methods 1 through 3 are generally known as ''drain hole'' completions, and method 4 is commonly called the ''case hole'' or ''stimulated'' completion.

Austin, C.; Zimmerman, C.; Sullaway, B.; Sabins, F.

1988-05-01T23:59:59.000Z

69

User_CompleteSF182  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Completing an External Training Request (SF-182) Completing an External Training Request (SF-182) © 2011 SuccessFactors, Inc. - 1 - SuccessFactors Learning Job Aid: Completing an External Training Request (SF-182) Purpose The purpose of this job aid is to guide users through the step-by-step process of completing an external training request form (SF-182). Complete an External Training Request (SF-182) - 11 Steps Task A Task A. Complete an External Training Request (SF-182) From the Home page, click the External Requests easy link. Click New Request to create a new training request form. Before completing the request form, it is recommended that you review the form to determine the required fields, indicated by red asterisks. This will assist you to determine the information you need to

70

Nanoscale magnetometry through quantum control of nitrogen-vacancy centres in rotationally diffusing nanodiamonds  

E-Print Network (OSTI)

The confluence of quantum physics and biology is driving a new generation of quantum-based sensing and imaging technology capable of harnessing the power of quantum effects to provide tools to understand the fundamental processes of life. One of the most promising systems in this area is the nitrogen-vacancy centre in diamond - a natural spin qubit which remarkably has all the right attributes for nanoscale sensing in ambient biological conditions. Typically the nitrogen-vacancy qubits are fixed in tightly controlled/isolated experimental conditions. In this work quantum control principles of nitrogen-vacancy magnetometry are developed for a randomly diffusing diamond nanocrystal. We find that the accumulation of geometric phases, due to the rotation of the nanodiamond plays a crucial role in the application of a diffusing nanodiamond as a bio-label and magnetometer. Specifically, we show that a freely diffusing nanodiamond can offer real-time information about local magnetic fields and its own rotational behaviour, beyond continuous optically detected magnetic resonance monitoring, in parallel with operation as a fluorescent biomarker.

D. Maclaurin; L. T. Hall; A. M. Martin; L. C. L. Hollenberg

2012-07-23T23:59:59.000Z

71

Complete  

NLE Websites -- All DOE Office Websites (Extended Search)

2 History File Checklist 11_0613 Page 1 of 5 2 History File Checklist 11_0613 Page 1 of 5 EOTA - Business Form Document Title: ISD History File Checklist Document Number: ISDF-012 Rev. 11_0613 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: ISDP-002, Training Production Process Notify of Changes: ADM, QAM, ISD, MGT Referenced Document(s): ISDF-001 Technical Direction, ISDF-035 Analysis Feasibility Assessment, ISDF-044 Course Feasibility Assessment, ISDF-045 Analysis Project Plan, ISDF-046 Training Design/Development Summary, ISDF-004 Design Document, ISDF-006 Script Template (Web), ISDF-007 Lesson Plan Template (ILT), ISDF-005 WBT Student Feedback Survey, ISDF-008 ILT Student Feedback Survey, ISDF-009 Design-Development Review Checklist, ISDF-010 After Action Report Template, ISDF-011 ISD

72

Evaluation of nitrogen- and silicon-vacancy defect centres as single photon sources in quantum key distribution  

E-Print Network (OSTI)

We demonstrate a quantum key distribution (QKD) testbed for room temperature single photon sources based on defect centres in diamond. A BB84 protocol over a short free-space transmission line is implemented. The performance of nitrogen-vacancy (NV) as well as silicon-vacancy defect (SiV) centres is evaluated and an extrapolation for next-generation sources with enhanced efficiency is discussed.

Matthias Leifgen; Tim Schrder; Friedemann Gdeke; Robert Riemann; Valentin Mtillon; Elke Neu; Christian Hepp; Carsten Arend; Christoph Becher; Kristian Lauritsen; Oliver Benson

2013-10-04T23:59:59.000Z

73

DEACTIVATION COMPLETION AND TURNOVER Deactivation Completion and Turnover  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COMPLETION AND TURNOVER COMPLETION AND TURNOVER Deactivation Completion and Turnover Overview of Turnover Turnover Checklists End-Points Closeout Method End-Point Files Description Examples of End-Point Closeout Methods Closeout Method Subjects of This Chapter Achieving consensus that deactivation is complete can involve several parties including the deactivation contractor, the Field Office, DOE Headquarters, the post-deactivation contractor, regulators, and stakeholders.  Overview of Turnover  Turnover Checklists and Documents  End-Points Closeout and Verification Overview of Turnover When facility deactivation activities are complete, some of the possibilities for the subsequent receiving organization include:  In cases of facilities that are contaminated, turnover to a remediation organization for managing

74

100 Area D4 Project Building Completion Report: December 2008 to December 2009  

SciTech Connect

This report documents the final status of buildings after the completion of D4 activities at the 100 Area of the U.S. Department of Energy Hanford Site from December 1, 2008, to December 31, 2009.

K.G. Finucane, J.P. Harrie

2010-10-26T23:59:59.000Z

75

Ad Building demolition, recycling completed  

NLE Websites -- All DOE Office Websites (Extended Search)

Ad Building demolition, recycling completed Ad Building demolition, recycling completed Ad Building demolition, recycling completed Demolition of the Administration Building helps Los Alamos meet an NNSA directive to reduce its structural footprint, modernize its infrastructure, and provide workers with safe, energy-efficient facilities. October 11, 2011 Demolition of the administration building Demolition of the Administration Building Contact Steve Sandoval Communications Office (505) 665-9206 Email Project finished under budget, ahead of schedule LOS ALAMOS, New Mexico, October 11, 2011-Los Alamos National Laboratory has completed demolition of its former Administration Building. Demolition of the 316,500-square-foot building that was home to seven Laboratory directors was completed five months ahead of the original schedule and

76

Site Transition Process Upon Cleanup Completion | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion More...

77

High-fidelity quantum memory using nitrogen-vacancy center ensemble for hybrid quantum computation  

E-Print Network (OSTI)

We study a hybrid quantum computing system using nitrogen-vacancy center ensemble (NVE) as quantum memory, current-biased Josephson junction (CBJJ) superconducting qubit fabricated in a transmission line resonator (TLR) as quantum computing processor and the microwave photons in TLR as quantum data bus. The storage process is seriously treated by considering all kinds of decoherence mechanisms. Such a hybrid quantum device can also be used to create multi-qubit W states of NVEs through a common CBJJ. The experimental feasibility and challenge are justified using currently available technology.

W. L. Yang; Zhang-qi Yin; Y. Hu; M. Feng; J. F. Du

2011-06-15T23:59:59.000Z

78

Method for enhancement of useful luminescence from vacancy defects in refractory oxides for tunable lasers  

DOE Patents (OSTI)

Refractory oxide crystals suitable for use in tunable lasers and a method for preparing the same are provided. The crystals are characterized by high quantum efficiency, high thermal stability, good crystal transparency, and a high percentage of useful luminescence. The method for preparation of the crystals involves removing substantially all the hydrogen, thermochemically reducing the crystal's oxygen content to produce oxygen (anion) vacancy defects, and subsequently irradiating the crystal with electrons to inactivate trace H.sup.- ions so that an increased amount of short lived F.sup.+ luminescence is produced when the crystal is optically excited.

Chen, Yok (Oak Ridge, TN)

1990-01-01T23:59:59.000Z

79

Status and Future of TRANSCOM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steve Casey Steve Casey U.S. Dept. of Energy Carlsbad Field Office  Current Program status g  Upcoming Changes  Glimpse at future options  DOE Commitments 2 6/3/2010 2  Current Program status g * Computer Based Training * User Support Site * Program Support * Program Accomplishments U i Ch  Upcoming Changes  Glimpse at future options  DOE Commitments 3  1 st release - December 2009 9  Covers general user training  Allows organizations access to training without waiting for a traditional class  Computer security module to be added Autumn 2010 Autumn 2010  Shipper/Scheduler training - being considered 4 6/3/2010 3  Completely overhauled in p y 2009  Features are user friendly  Layout more intuitive

80

Plant Operational Status - Pantex Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

Status Plant Operational Status Page Content Operational Status Shift 1 - Day The Pantex Plant is open for normal operations. All personnel are to report for duty according to...

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Heuristic status polling  

DOE Patents (OSTI)

Methods, compute nodes, and computer program products are provided for heuristic status polling of a component in a computing system. Embodiments include receiving, by a polling module from a requesting application, a status request requesting status of a component; determining, by the polling module, whether an activity history for the component satisfies heuristic polling criteria; polling, by the polling module, the component for status if the activity history for the component satisfies the heuristic polling criteria; and not polling, by the polling module, the component for status if the activity history for the component does not satisfy the heuristic criteria.

Archer, Charles J. (Rochester, MN); Blocksome, Michael A. (Rochester, MN); Heidelberger, Philip (Cortlandt Manor, NY); Kumar, Sameer (White Plains, NY); Parker, Jeffrey J. (Rochester, MN); Ratterman, Joseph D. (Rochester, MN)

2011-06-07T23:59:59.000Z

82

EBIS Project Status Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

All 20 0.5 m Coils complete * 1 st of 4 2.5m coils complete (DM) * 2 nd support tube insulation nearly complete (MH) * Pushers - complete, tube cut for forming in oven (AMDM?) *...

83

Horizontal completions challenge for industry  

SciTech Connect

As the technology to drill horizontal wells continues to evolve, the problem of efficiently and cost-effectively completing such wells grows. The economics of applying horizontal technology in high-productivity reservoirs demands both increased production and lower development costs. Such high productivity reservoirs are typical of the Gulf of Mexico, North Sea, South China basin, and other areas. Lowering development costs is achieved by drilling fewer wells and in the offshore environment by reducing the number of platforms and other well structures. Specifically addressed in this article are the problems of achieving high efficiency, long lasting completions while controlling costs in unconsolidated and poorly consolidated sandstone reservoirs.

Zaleski, T.E. Jr.; Spatz, E.

1988-05-02T23:59:59.000Z

84

CONTENTS Japan Completes First Offshore  

NLE Websites -- All DOE Office Websites (Extended Search)

Japan Completes First Offshore Japan Completes First Offshore Production Test .............................1 New Seismic Data Over Known Hydrate Occurrences in the Deepwater Gulf of Mexico .........3 Gas Hydrate Reservoirs in the Offshore Caribbean Region of Colombia ..........................................7 CSEM Survey of a Methane Vent Site, Offshore West Svalbard...12 Pressure Core Analysis Tools Used to Characterize Hydrate- Bearing Sediments from The Nankai Trough ..............................19 Using Noble Gas Signatures to Fingerprint Gas Streams Derived from Dissociating Methane Hydrate .......................................... 23 Announcements ...................... 27 * North Slope Oil and Gas Lands Set Aside for Methane Hydrate Research * 2014 Offshore Technology Conference to Have Sessions on

85

Status of DOE A-76 Studies  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE A-76 Studies DOE A-76 Studies (A/O July 15, 2008) Function Competition Affected FTE Status Savings RESL FY 07 Standard 19 Completed-Decision Jan. 2008 (MEO win) $4.9M Albany Research Center FY 06 Standard 74 Cancelled June 2007 Legacy Management FY 06 HPO 58 OMB approved HPO-June 2006 $16.5 DOE Logistics FY 02/03 Standard 144 Completed-Decision March 2006 (Contractor win) $1.6M New Brunswick Lab FY 04/05 Standard 40 Completed-Decision March 2006 (MEO win) $2.6M Environmental Engineering Services FY 04/05 Standard 684 CANCELLED September 2005 Information Technology FY 02/03 Standard 642 1000+ Contractors Completed-Decision July 2005 (MEO win) $456M ARC Logistics Standard 8 Completed-Decision March 2005 (MEO win) $0.8M Human Resources FY 02/03 Standard 146 Completed-Decision September

86

Lyme Carditis with Transient Complete Heart Block  

E-Print Network (OSTI)

demonstrating complete heart block Volume XI, no . 2 : Maywith Transient Complete Heart Block Katherine W. D. Dolbecsecond-degree to first-degree heart block before complete

Dolbec, Katherine W D; Higgins, George L; Saucier, John R

2010-01-01T23:59:59.000Z

87

Site Transition Process Upon Cleanup Completion | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup...

88

Geothermal Drilling and Completion Technology Development Program. Quarterly progress report, January 1981-March 1981  

DOE Green Energy (OSTI)

The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods as they apply to advanced drilling systems.

Kelsey, J.R. (ed.)

1981-06-01T23:59:59.000Z

89

Geothermal Drilling and Completion Technology Development Program. Quarterly progress report, October 1980-December 1980  

Science Conference Proceedings (OSTI)

The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods. Advanced drilling systems are also under development.

Kelsey, J.R. (ed.)

1981-03-01T23:59:59.000Z

90

Uranium vacancy mobility at the sigma 5 symmetric tilt grain boundary in UO2  

Science Conference Proceedings (OSTI)

An important consequence of the fissioning process occurring during burnup is the formation of fission products. These fission products alter the thermo-mechanical properties of the fuel. They also lead to macroscopic changes in the fuel structure, including the formation of bubbles that are connected to swelling of the fuel. Subsequent release of fission gases increase the pressure in the plenum and can cause changes in the properties of the fuel pin itself. It is thus imperative to understand how fission products, and fission gases in particular, behave within the fuel in order to predict the performance of the fuel under operating conditions. Fission gas redistribution within the fuel is governed by mass transport and the presence of sinks such as impurities, dislocations, and grain boundaries. Thus, to understand how the distribution of fission gases evolves in the fuel, we must understand the underlying transport mechanisms, tied to the concentrations and mobilities of defects within the material, and how these gases interact with microstructural features that might act as sinks. Both of these issues have been addressed in previous work under NEAMS. However, once a fission product has reached a sink, such as a grain boundary, its mobility may be different there than in the grain interior and predicting how, for example, bubbles nucleate within grain boundaries necessitates an understanding of how fission gases diffuse within boundaries. That is the goal of the present work. In this report, we describe atomic level simulations of uranium vacancy diffusion in the pressence of a {Sigma}5 symmetric tilt boundary in urania (UO{sub 2}). This boundary was chosen as it is the simplest of the boundaries we considered in previous work on segregation and serves as a starting point for understanding defect mobility at boundaries. We use a combination of molecular statics calculations and kinetic Monte Carlo (kMC) to determine how the mobility of uranium vacancies is altered at this particular grain boundary. Given that the diffusion of fission gases such as Xe are tied to the mobility of uranium vacancies, these results given insight into how fission gas mobility differs at grain boundaries compared to bulk urania.

Uberuaga, Blas P. [Los Alamos National Laboratory

2012-05-02T23:59:59.000Z

91

Low energy electron beam induced vacancy activation in GaN  

Science Conference Proceedings (OSTI)

Experimental evidence on low energy electron beam induced point defect activation in GaN grown by metal-organic vapor phase epitaxy (MOVPE) is presented. The GaN samples are irradiated with a 5-20 keV electron beam of a scanning electron microscope and investigated by photoluminescence and positron annihilation spectroscopy measurements. The degradation of the band-to-band luminescence of the irradiated GaN films is associated with the activation of point defects. The activated defects were identified as in-grown Ga-vacancies. We propose that MOVPE-GaN contains a significant concentration of passive V{sub Ga}-H{sub n} complexes that can be activated by H removal during low energy electron irradiation.

Nykaenen, H.; Suihkonen, S.; Sopanen, M. [Department of Micro- and Nanosciences, Aalto University, P.O. Box 13500, FI-00076 Aalto (Finland); Kilanski, L. [Department of Applied Physics, Aalto University, P.O. Box 11100, FI-00076 Aalto (Finland); Institute of Physics, Polish Academy of Sciences, Al. Lotnikow 32/56, 02-668 Warsaw (Poland); Tuomisto, F. [Department of Applied Physics, Aalto University, P.O. Box 11100, FI-00076 Aalto (Finland)

2012-03-19T23:59:59.000Z

92

HSPD-12 Implementation Status Report Updated Date:  

NLE Websites -- All DOE Office Websites (Extended Search)

Implementation Status Report Implementation Status Report Updated Date: Number of Employees requiring PIV credentials* Number of Employees requiring a NACI (or at least equivalent) that have not previously undergone a background check* Number of Employees requiring a NACI (or at least equivalent) with background investigation in process* Number of Employees with completed/adjudicated NACI (or equivalent background investigation)* Total Number of PIV credentials Issued to Employees* Number of Contractors requiring PIV credentials Number of Contractors requiring NACIs (or at least equivalent) that have not previously undergone a background check Number of Contractors requiring a NACI (or at least equivalent) with background investigation in process Number of Contractors with

93

NGPL Louisiana station nears completion  

Science Conference Proceedings (OSTI)

Construction on a 3,600-hp compressor station on the Louisiana line of Natural Gas Pipeline Co. of America near Henry, La., was scheduled for completion later this month. The Louisiana line extends some 205 miles along the Gulf Coast between New Caney, Tex., and the Henry hub area. The new compressor station will be located about 44 miles west of the Henry hub. Work began on the $5.1 million expansion project in Cameron Parish, La., in May following Federal Energy Regulatory Commission (FERC) certification. By mid-September, the compressor building, service building, and meter house has been erected, final compressor inspections were under way, and gas piping tie-ins had been completed, according to NGPL. Powered by three 1,200-hp Solar Saturn gas-fired centrifugal engines, the station is designed to increase the capacity of the Louisiana line east of the Stingray pipeline system by up to 220 MMcfd. Current capacity for east bound flows is approximately 900 MMcfd.

Not Available

1990-10-22T23:59:59.000Z

94

BCDA Machine Status Link  

NLE Websites -- All DOE Office Websites (Extended Search)

Machine Status Link Machine Status Link Version 1.33 (December 2005) David M. Kline. The Machine Status Link (MSL) is responsible for distributing the digitized beam current, injection status, P0 clock, and other statuses over a single fiber to several locations around the Storage Ring. The MRD100 is a VME-based module that is part of the MSL and was specifically designed for the APS. It receives and interprets information from the XMS100 module by means of copper or fiber. Signals from the XMS100 module are sent at a P0 rate (3.667 microseconds). It sends two registers every cycle and all in about 12 cycles. Refer to the ASD website for additional information regarding the MSL. The focus of this page is to provide information of how to configure the MRD100 for a beamline IOC and to discuss the sample IOC

95

N reactor safety upgrades final status report  

Science Conference Proceedings (OSTI)

This document describes the requirements, objectives, work completed, and issues resolved for all safety upgrades recommended by the various expert panels (e.g., Roddis), National Academy of Sciences (NAS), and Westinghouse Independent Safety Appraisal (WISA) team. This report reflects the status of the recommendations at the time of publication, while the reactor is being placed in cold standby. Each recommendation required a resolution, a closure process if closed, and a punchlist reference if open and required for restart. These recommendations are maintained on databases that were updated periodically as work was completed or punchlisted. The databases and files are to be retained with the N Reactor Standby files.

Foreman, S.K.; Rainey, T.E.; Erpenbeck, E.G.

1990-02-01T23:59:59.000Z

96

Oil shale: Technology status report  

Science Conference Proceedings (OSTI)

This report documents the status of the US Department of Energy's (DOE) Oil Shale Program as of the end of FY 86. The report consists of (1) a status of oil shale development, (2) a description of the DOE Oil Shale Program, (3) an FY 86 oil shale research summary, and (4) a summary of FY 86 accomplishments. Discoveries were made in FY 86 about the physical and chemical properties and behavior of oil shales, process chemistry and kinetics, in situ retorting, advanced processes, and the environmental behavior and fate of wastes. The DOE Oil Shale Program shows an increasing emphasis on eastern US oil shales and in the development of advanced oil shale processing concepts. With the award to Foster Wheeler for the design of oil shale conceptual plants, the first step in the development of a systems analysis capability for the complete oil shale process has been taken. Unocal's Parachute Creek project, the only commercial oil shale plant operating in the United States, is operating at about 4000 bbl/day. The shale oil is upgraded at Parachute Creek for input to a conventional refinery. 67 refs., 21 figs., 3 tabs.

Not Available

1986-10-01T23:59:59.000Z

97

Weekly Petroleum Status Report  

U.S. Energy Information Administration (EIA)

Weekly Petroleum Status Report/Energy Information Administration v U.S. crude oil refinery inputs averaged about 14.6 million barrels per day during the week ending ...

98

SSRL Light Source Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Stanford Synchrotron Radiation Lightsource An Office of Science User Facility Beam Current: 0.00 mA Beam Status: Down Loss Rate: 0.00 mAmin SPEAR Operator Messages 4-SEP-2013...

99

{ital K}-shell vacancies carried by swift O and Si ions inside ferromagnetic hosts  

Science Conference Proceedings (OSTI)

The single and double {ital K}-shell vacancy fractions for swift O and Si ions inside Fe and Gd foils have been measured using the probe layer technique. The measurements are carried out at velocities varying from 7.5 to 13.5{ital v}{sub 0} for Si ions and at a velocity of 7.8{ital v}{sub 0} for oxygen ions ({ital v}{sub 0}={alpha}{ital c} where {alpha} is the fine-structure constant and {ital c} is the speed of light). It is shown that all such available data for light ions fall on a smooth curve when plotted against the reduced velocity of the ion. These values are used along with the existing transient magnetic field data to derive the electron spin polarization acquired by the ions traveling inside ferromagnetic hosts. The degree of polarization is shown to decrease with the atomic number of the ions. This observation is, however, in disagreement with recent theoretical calculations.

Tribedi, L.C.; Prasad, K.G.; Tandon, P.N. [Tata Institute of Fundamental Research, Homi Bhabha Road, Bombay 400 005 (India)

1995-05-01T23:59:59.000Z

100

Geothermal drilling ad completion technology development program. Semi-annual progress report, April-September 1979  

DOE Green Energy (OSTI)

The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, and completion technology. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1982 and by 50% by 1986.

Varnado, S.G. (ed.)

1980-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Geothermal drilling and completion technology development program. Quarterly progress report, January-March 1980  

DOE Green Energy (OSTI)

The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1983 and by 50% by 1987.

Varnado, S.G. (ed.)

1980-04-01T23:59:59.000Z

102

Geothermal drilling and completion technology development program. Annual progress report, October 1979-September 1980  

DOE Green Energy (OSTI)

The progress, status, and results of ongoing research and development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1983 and by 50% by 1987.

Varnado, S.G. (ed.)

1980-11-01T23:59:59.000Z

103

Geothermal drilling and completion technology development program. Quarterly progress report, April-June 1980  

DOE Green Energy (OSTI)

The progress, status, and results of ongoing research and development (R and D) within the Geothermal Drilling and Completion Technology Development Program are reported. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1983 and by 50% by 1987.

Varnado, S.G.

1980-07-01T23:59:59.000Z

104

Geothermal drilling and completion technology development program. Semi-annual progress report, October 1978-March 1979  

DOE Green Energy (OSTI)

The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drill bits, drilling fluids, and completion technology. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1982 and by 50% by 1986.

Varnado, S.G. (ed.)

1979-09-01T23:59:59.000Z

105

Geothermal drilling and completion technology development program. Quarterly progress report, October-December 1979  

DOE Green Energy (OSTI)

The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, and completion technology. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1982 and by 50% by 1986.

Varnado, S.G. (ed.)

1980-01-01T23:59:59.000Z

106

EBIS Project Status Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

4, 2012 4, 2012 Electron Lens 2 E-Lens Magnet, Tooling Magnet * Cold mass, cryostat drawing work continues (SP/PK/SS) * Yoke NLE Restraint Cylinder - 1 more rework for leads (RC/SP) * Part orders being prioritized, released; bellows, cryo valve, heat shield, etc. (SRP) Tooling * Testing Top Hat assembly complete (RM/SD/DC/WM etc.) * Cryostatting, pressure test fixture Mods in CS (PK) - supporting schedule * Magnetic Needle Tooling - COMPLETE 3 Main Solenoid Coils 2 nd main solenoid * CS machining complete * Stainless steel support machining complete 4 AFF, FF Solenoid coils * FF coil #1 - FF coil #4 * Mods complete to ID to fit to main support tube * AFF #3 Final electrical tests complete (DI) * AFF #4 overwrap & cure, Final electrical tests complete (DI) 5 eLens - Cold Test Assembly Magnet #1:

107

Context-Sensitive Query Auto-Completion ?  

E-Print Network (OSTI)

Query auto completion is known to provide poor predictions of the users query when her input prefix is very short (e.g., one or two characters). In this paper we show that context, such as the users recent queries, can be used to improve the prediction quality considerably even for such short prefixes. We propose a context-sensitive query auto completion algorithm, NearestCompletion, which outputs the completions of the users input that are most similar to the context queries. To measure similarity, we represent queries and contexts as high-dimensional term-weighted vectors and resort to cosine similarity. The mapping from queries to vectors is done through a new query expansion technique that we introduce, which expands a query by traversing the query recommendation tree rooted at the query. In order to evaluate our approach, we performed extensive experimentation over the public AOL query log. We demonstrate that when the recent users queries are relevant to the current query she is typing, then after typing a single character, NearestCompletions MRR is 48 % higher relative to the MRR of the standard MostPopularCompletion algorithm on average. When the context is irrelevant, however, NearestCompletions MRR is essentially zero. To mitigate this problem, we propose HybridCompletion, which is a hybrid of NearestCompletion with MostPopularCompletion. HybridCompletion is shown to dominate both NearestCompletion and MostPopularCompletion, achieving a total improvement of 31.5 % in MRR relative to MostPopular-Completion on average.

Ziv Bar-yossef; Naama Kraus

2011-01-01T23:59:59.000Z

108

RECRUITMENT OF U.S. CITIZENS FOR VACANCIES IN IAEA SAFEGUARDS.  

SciTech Connect

The International Atomic Energy Agency (IAEA) relies on its member states to assist with recruiting qualified individuals for positions within the IAEA's secretariat. It is likewise important to the U.S. government for U.S. citizens to take positions with the IAEA to contribute to its success. It is important for persons within and outside the U.S. nuclear and safeguards industries to become aware of the job opportunities available at the IAEA and to be informed of important vacancies as they arise. The International Safeguards Project Office (ISPO) at Brookhaven National Laboratory (BNL) is tasked by the U.S. government with recruiting candidates for positions within the Department of Safeguards at the IAEA and since 1998, has been actively seeking methods for improving outreach. In addition, ISPO has been working more closely with the IAEA Division of Personnel. ISPO staff members attend trade shows to distribute information about IAEA opportunities. The shows target the nuclear industry as well as shows that are unrelated to the nuclear industry. ISPO developed a web site that provides information for prospective candidates. They have worked with the IAEA to understand its recruitment processes, to make suggestions for improvements, and to understand employment benefits so they can be communicated to potential U.S. applicants. ISPO is also collaborating with a State Department working group that is focused on increasing U.S. representation within the United Nations as a whole. Most recently Secretary of State Condoleezza Rice issued a letter to all Federal Agency heads encouraging details and transfers of their employees to international organizations to the maximum extent feasible and with due regard to their manpower requirements. She urged all federal agencies to review their detail and transfer policies and practices to ensure that employment in international organizations is promoted in a positive and active manner. In addition, she wrote that it is important that agencies examine their policies and practices for returning employees from details and transfer to ensure that reintegration procedures result in both the agency and such employees receiving optimal benefit from the international organization experience. This paper follows a 1999 paper on the same topic.

OCCHIOGROSSO, D.; PEPPER, S.

2006-07-16T23:59:59.000Z

109

MMCR Upgrades: Present Status and Future Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

MMCR Upgrades: Present Status and Future Plans MMCR Upgrades: Present Status and Future Plans K. B. Widener and A. S. Koontz Pacific Northwest National Laboratory Richland, Washington K. P. Moran and K. A. Clark National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado C. Chander STC xxxxxxxxx M. A. Miller and K. L. Johnson Brookhaven National Laboratory Upton, New York Abstract In September 2003, the Southern Great Plains (SGP) millimeter wave cloud radar (MMCR) was upgraded to a new digital signal processor that significantly increases the temporal resolution and the processing capability of the MMCR. The Barrow MMCR upgrade will be completed in early 2004. We will discuss the hardware and software C40 upgrade to the MMCRs at SGP and Barrow and the plans

110

High fidelity gate operations within the coupled nuclear and electron spins of a nitrogen vacancy center in diamond  

E-Print Network (OSTI)

In this article we investigate the dynamics of a single negatively charged nitrogen-vacancy center (NV-) coupled to the spin of the nucleus of a 15-nitrogen atom and show that high fidelity gate operations are possible without the need for complicated composite pulse sequences. These operations include both the electron and nuclear spin rotations, as well as an entangling gate between them. These are experimentally realizable gates with current technology of sufficiently high fidelities that they can be used to build graph states for quantum information processing tasks.

Mark S. Everitt; Simon Devitt; W. J. Munro; Kae Nemoto

2013-09-12T23:59:59.000Z

111

Development of Monte Carlo Simulation Code to Model Behavior of Hydrogen Isotopes Loaded into Tungsten Containing Vacancies  

DOE Green Energy (OSTI)

The behavior of hydrogen isotopes implanted into tungsten containing vacancies was simulated using a Monte Carlo technique. The correlations between the distribution of implanted deuterium and fluence, trap density and trap distribution were evaluated. Throughout the present study, qualitatively understandable results were obtained. In order to improve the precision of the model and obtain quantitatively reliable results, it is necessary to deal with the following subjects: (1) how to balance long-time irradiation processes with a rapid diffusion process, (2) how to prevent unrealistic accumulation of hydrogen, and (3) how to model the release of hydrogen forcibly loaded into a region where hydrogen densely exist already.

T. Oda; M. Shimada; K. Zhang; P. Calderoni; Y. Oya; M. Sokolov; R. Kolasinski

2011-11-01T23:59:59.000Z

112

EBIS Project Status Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

April 12, 2011 April 12, 2011 Electron Lens 2 Outline Corrector coils Main solenoid coils Anti-Fringe field, Fringe Field coils Schedule 3 Corrector coils * 1 st Coil winding complete * 2 nd Coil winding started * OVEN - need "retort" for final cure (AM/RC) 4 Main Solenoid Coils * Support tube insulated, Kapton wrinkled due to out-gassing during cure; re-insulated & cured without problem * Internal support flanges installed, insulated * Hipot complete * Lead end "lead" flange received * Released winding travelers are available * Parts deliveries 90% complete * Dimensional issue investigated, resolved - to be checked Monday 4/11 (LR) * Winding should start ~ 4/13 5 AFF, FF Solenoid coils * AFF support hub, Winding machine upgrade are complete * AFF Coil #1 * complete * AFF Coil #2

113

DOE 2010 Safety and Security Reform Project - HSS Directives Disposition and Status (December 4, 2012)  

NLE Websites -- All DOE Office Websites (Extended Search)

10 Safety and Security Reform Project - HSS Directives Disposition and Status (December 4, 2012) 10 Safety and Security Reform Project - HSS Directives Disposition and Status (December 4, 2012) Page 1 of 3 2010 HSS Directives Disposition Status Secretary of Energy Notice SEN-35-91, Nuclear Safety Policy Revise Complete - see Policy 420.1. Order 5400.5, Radiation Protection of the Public and the Environment Revise Complete - see Order 458.1. Order 5480.19, Conduct of Operations Requirements for DOE Facilities Revise Complete - see Order 422.1. Order 5480.20A, Personnel Selection, Training, Qualification, and Certification Requirements Revise Complete - see Order 426.2. Order 5480.30, Nuclear Reactor Design Criteria Re-certify Complete - re-certified. Manual 140.1-1B, Interface with the Defense Nuclear Facilities Safety Board Re-certify Complete - re-certified.

114

Underbalanced completions improve well safety and productivity  

Science Conference Proceedings (OSTI)

Recent advances in completion technology, especially the use of and advances in coiled tubing technology, have presented the petroleum industry with methods that were previously unknown or considered too risky. Specifically, coiled tubing drilling and underbalanced drilling have both proven to be effective and acceptable methods in industry today. Several methods have been presented that will allow for the well to be completed underbalanced. By utilizing these methods, the completion process can be carried out while experiencing the same benefits offered by underbalanced drilling. the well can be completed with minimal fluid loss, which will result in reduced formation damage and improved well productivity. This new approach to the completion process provides additional opportunities both for completing new wells and for reentering existing wells.

Walker, T.; Hopmann, M. [Baker Oil Tools, Houston, TX (United States)

1995-11-01T23:59:59.000Z

115

Geothermal Well Completion Tests | Open Energy Information  

Open Energy Info (EERE)

Geothermal Well Completion Tests Geothermal Well Completion Tests Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Paper: Geothermal Well Completion Tests Abstract This paper reviews the measurements that are typically made in a well immediately after drilling is completed - the Completion Tests. The objective of these tests is to determine the properties of the reservoir, and of the reservoir fluid near the well. A significant amount of information that will add to the characterisation of the reservoir and the well, can only be obtained in the period during and immediately after drilling activities are completed. Author Hagen Hole Conference Petroleum Engineering Summer School; Dubrovnik, Croatia; 2008/06/09 Published N/A, 2008 DOI Not Provided Check for DOI availability: http://crossref.org

116

Slimhole Drilling, Logging, and Completion Technology - An Update  

DOE Green Energy (OSTI)

Using slim holes (diameter < 15 cm) for geothermal exploration and small-scale power production can produce significant cost savings compared to conventional rotary-drilling methods. In addition, data obtained from slim holes can be used to lower the risks and costs associated with the drilling and completion of large-diameter geothermal wells. As a prime contractor to the U.S. Department of Energy (DOE), Sandia National Laboratories has worked with industry since 1992 to develop and promote drilling, testing, and logging technology for slim holes. This paper describes the current status of work done both in-house and contracted to industry. It focuses on drilling technology, case histories of slimhole drilling projects, data collection and rig instrumentation, and high-temperature logging tools.

FINGER,JOHN T.; JACOBSON,RONALD D.

1999-10-07T23:59:59.000Z

117

NNSA Completes Successful Facilities and Infrastructure Recapitalization  

National Nuclear Security Administration (NNSA)

Completes Successful Facilities and Infrastructure Recapitalization Completes Successful Facilities and Infrastructure Recapitalization Program | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Press Releases > NNSA Completes Successful Facilities and Infrastructure Recapitalization Program Press Release NNSA Completes Successful Facilities and Infrastructure Recapitalization

118

NIST Complete hemispherical infrared laser-based ...  

Science Conference Proceedings (OSTI)

... A custom instrument, the Complete Hemispherical infrared Laser-based Reflectometer ... using light input from a selection of lasers covering the ...

2010-10-05T23:59:59.000Z

119

Environmental Management Completed Projects 2005-Present  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Management Completed Projects 2005-Present December 7, 2012 U.S. Department of Energy Before, during, and after pictures of the K-33 building decontamination,...

120

Natural Gas Pipeline Projects Completed in 2003  

U.S. Energy Information Administration (EIA)

Table 2. Natural Gas Pipeline Projects Completed in 2003; Ending Region & State: Begins in State - Region: Pipeline/Project Name: FERC Docket ...

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

JOBAID-LAUNCHING AND COMPLETING ASSIGNED SURVEY  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of this job aid is to guide users through the step-by-step process of launching and completing assigned surverys.

122

China National Machinery Industry Complete Engineering Corporation...  

Open Energy Info (EERE)

construction project, trading, military equipment manufacturing, real estate and waste-to-energy project development. References China National Machinery Industry Complete...

123

ESnet Planning, Status,  

NLE Websites -- All DOE Office Websites (Extended Search)

ESnet Planning, Status, ESnet Planning, Status, and Future Issues William E. Johnston, ESnet Department Head and Senior Scientist Joe Burrescia, General Manager Mike Collins, Chin Guok, and Eli Dart, Engineering Brian Tierney, Advanced Development Jim Gagliardi, Operations and Deployment Stan Kluz, Infrastructure and ECS Mike Helm, Federated Trust Dan Peterson, Security Officer Gizella Kapus, Business Manager and the rest of the ESnet Team wej@es.net, this talk is available at www.es.net Energy Sciences Network Lawrence Berkeley National Laboratory Networking for the Future of Science ASCAC, August 2008 2 DOE Office of Science and ESnet - the ESnet Mission * ESnet is an Office of Science ("SC") facility in the Office of Advanced Scientific Computing Research ("ASCR")

124

Weekly Petroleum Status Report  

U.S. Energy Information Administration (EIA) Indexed Site

Petrolem Reports Petrolem Reports Weekly Petroleum Status Report Data for week ending Dec. 13, 2013 | Release Date: Dec. 18, 2013 | Next Release Date: Dec. 27, 2013 | full report Previous Issues Week: December 18, 2013 December 11, 2013 December 4, 2013 November 27, 2013 November 20, 2013 November 14, 2013 November 6, 2013 October 30, 2013 October 23, 2013 October 21, 2013 October 9, 2013 October 2, 2013 prior issues Go The petroleum supply situation in the context of historical information and selected prices. Released after 10:30 a.m. 1:00 p.m. Highlights Weekly Petroleum Status Report Highlights PDF PDF Data Overview (Combined Table 1 and Table 9) PDF Tables 1 U.S. Petroleum Balance Sheet CSV XLS PDF 2 U.S. Inputs and Production by PAD District CSV XLS PDF

125

Small Business Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact of Teaming Arrangements on Impact of Teaming Arrangements on Small Business Status The Department of Energy is planning to set aside for small businesses a number of acquisitions of a very complex nature, requiring a myriad of capabilities on the part of offerors, which might result in teaming arrangements or joint ventures being formed. Given this, the Department believes that potential offerors should be aware of the Small Business Administration's regulations regarding affiliation. As such, DOE will include the following provision in solicitations where it expects teaming or joint ventures to propose. GUIDANCE FOR PROSPECTIVE OFFERORS - IMPACT OF TEAMING ARRANGEMENTS ON SMALL BUSINESS STATUS (a) This procurement has been set aside for small business. In order to ensure that award

126

Hopper Updates and Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Updates and Status Current Status: Up Open Issues List of known problems, submitted bug reports and issues we are actively working on. Read More » Hopper Featured Announcements A list of key Hopper announcements and system changes. Read More » Hopper Email Announcements Archive An archive of email announcements sent to NERSC users regarding Hopper. Read More » Announcements Hopper OS upgrade and new SW set to default next Wed, Feb 27 21 February 2013, 10:29 am Hopper scheduled maintenance tomorrow (Sept 19) and /project outage 18 September 2012, 4:46 pm Please use "gres" settings in your batch scripts 4 September 2012, 2:03 pm high thruput queue now available on Hopper 30 August 2012, 4:27 pm max walltime for low queue is increased to 24 hrs on Hopper

127

Status of MARS Code  

SciTech Connect

Status and recent developments of the MARS 14 Monte Carlo code system for simulation of hadronic and electromagnetic cascades in shielding, accelerator and detector components in the energy range from a fraction of an electronvolt up to 100 TeV are described. these include physics models both in strong and electromagnetic interaction sectors, variance reduction techniques, residual dose, geometry, tracking, histograming. MAD-MARS Beam Line Build and Graphical-User Interface.

N.V. Mokhov

2003-04-09T23:59:59.000Z

128

MARS Flight Engineering Status  

DOE Green Energy (OSTI)

The Multi-sensor Airborne Radiation Survey Flight Engineering project (MARS FE) has designed a high purity germanium (HPGe) crystal array for conducting a wide range of field measurements. In addition to the HPGe detector system, a platform-specific shock and vibration isolation system and environmental housing have been designed to support demonstration activities in a maritime environment on an Unmanned Surface Vehicle (USV). This report describes the status of the equipment as of the end of FY09.

Fast, James E.; Dorow, Kevin E.; Morris, Scott J.; Thompson, Robert C.; Willett, Jesse A.

2010-04-06T23:59:59.000Z

129

Antares: a status report  

DOE Green Energy (OSTI)

Antares is the Los Alamos Scientific Laboratory 100-kJ CO/sub 2/ laser driver for inertial confinement fusion experiments. The status of the various Antares subsystems is discussed. These subsystems consist of facilities, front end, energy storage, power amplifier, target, optical alignment and diagnostics, large optics, and controls. The installation of Antares is underway and the schedule to permit experiments which may lead to breakeven in 1984 is discussed.

Stine, R.D. Jr.

1979-01-01T23:59:59.000Z

130

Status of KLOE-2  

E-Print Network (OSTI)

In a few months the KLOE-2 detector is expected to start data taking at the upgraded DA$\\rm{\\Phi}$NE $\\phi$-factory of INFN Laboratori Nazionali di Frascati. It aims to collect 25 fb$^{-1}$ at the $\\phi(1020)$ peak, and about 5 fb$^{-1}$ in the energy region between 1 and 2.5 GeV. We review the status and physics program of the project

,

2010-01-01T23:59:59.000Z

131

Status of fusion maintenance  

SciTech Connect

Effective maintenance will be an essential ingredient in determining fusion system productivity. This level of productivity will result only after close attention is paid to the entire system as an entity and appropriate integration of the elements is made. The status of fusion maintenance is reviewed in the context of the entire system. While there are many challenging developmental tasks ahead in fusion maintenance, the required technologies are available in several high-technology industries, including nuclear fission.

Fuller, G.M.

1984-01-01T23:59:59.000Z

132

The LEU conversion status of U.S. Research Reactors.  

SciTech Connect

This paper summarizes the conversion status of US research and test reactors and estimates uranium densities needed to convert reactors with power levels 21 MW from HEU ({ge} 20% U-235) to LEU (<20% U-235) fuels. Detailed conversion studies for each reactor need to be completed in order to establish the feasibility of using LEU fuels.

Matos, J. E.

1997-11-14T23:59:59.000Z

133

Quarterly Construction Status Report Period Ending: June 30, 2012  

E-Print Network (OSTI)

of each project together with progress photographs and the project manager's estimate of the cost to complete the project. Because the reports contain projected costs and also account for budget risks #12;Quarterly Construction Status Report Period Ending: June 30, 2012 Project Number Project Index

Holsinger, Kent

134

Free energies, vacancy concentrations and density distribution anisotropies in hard--sphere crystals: A combined density functional and simulation study  

E-Print Network (OSTI)

We perform a comparative study of the free energies and the density distributions in hard sphere crystals using Monte Carlo simulations and density functional theory (employing Fundamental Measure functionals). Using a recently introduced technique (Schilling and Schmid, J. Chem. Phys 131, 231102 (2009)) we obtain crystal free energies to a high precision. The free energies from Fundamental Measure theory are in good agreement with the simulation results and demonstrate the applicability of these functionals to the treatment of other problems involving crystallization. The agreement between FMT and simulations on the level of the free energies is also reflected in the density distributions around single lattice sites. Overall, the peak widths and anisotropy signs for different lattice directions agree, however, it is found that Fundamental Measure theory gives slightly narrower peaks with more anisotropy than seen in the simulations. Among the three types of Fundamental Measure functionals studied, only the White Bear II functional (Hansen-Goos and Roth, J. Phys.: Condens. Matter 18, 8413 (2006)) exhibits sensible results for the equilibrium vacancy concentration and a physical behavior of the chemical potential in crystals constrained by a fixed vacancy concentration.

M. Oettel; S. Goerig; A. Haertel; H. Loewen; M. Radu; T. Schilling

2010-09-03T23:59:59.000Z

135

Current status of the RERTR Program  

SciTech Connect

The main purpose of this paper is to review the progress which has been accomplished by the RERTR Program during the past year, the present status of the program, the activities which are now in progress, and the program plans for the coming years. The changes that have taken place in the overall program plan are, in themselves, not very significant. Some activities were found to be somewhat more difficult than expected and required a longer time to complete; others were found to be less difficult than expected and caused opposite readjustments of the program plan. These effects tend to balance each other when the program is considered as a whole.

Travelli, A.

1980-01-01T23:59:59.000Z

136

EBIS Project Status Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

April 10, 2012 April 10, 2012 Electron Lens 2 E-Lens Magnet, Tooling Magnet * Cold mass drawings submitted to Central Shops * Cryostat drawing work continues - (SP/PK/SS) * Cryostat pipe thickness? (SS/SP) * new heat shield vendor - requisition submitted, sole source justification submitted, new drawings sent for vendor review - awaiting confirmation / quote (SP/HH) Tooling * Cryostatting, pressure test fixture Mods in CS (PK) - complete 3 Main Solenoid Coils 2 nd main solenoid * End sleeve installation complete * Anti-fringe field coil installation changed to properly orient main solenoid leads * Wires being prepped for wiring board installation (DM / DC) 4 eLens - Cold Test Assembly Magnet #1: * Wiring complete * Dewar installation complete 4/4 * Electrical/Programming work continues Magnet #2: *

137

Gravel packing feasible in horizontal well completions  

SciTech Connect

Successful completion of horizontal wells in unconsolidated formations depends on proper equipment selection and installation method balanced with reservoir objectives, formation parameters, and costs. The guidelines for designing these completions are based on generalized field experience, including horizontal cases where applicable.

Zaleski, T.E. Jr.; Ashton, J.P. (Baker Sand Control, Houston, TX (US))

1990-06-11T23:59:59.000Z

138

Context-sensitive query auto-completion  

Science Conference Proceedings (OSTI)

Query auto completion is known to provide poor predictions of the user's query when her input prefix is very short (e.g., one or two characters). In this paper we show that context, such as the user's recent queries, can be used to improve the prediction ... Keywords: context-awareness, query auto-completion, query expansion

Ziv Bar-Yossef; Naama Kraus

2011-03-01T23:59:59.000Z

139

Introducing complete graphs in molecular connectivity studies  

Science Conference Proceedings (OSTI)

The mathematical model of the molecular polarizability of fifty-four organic compounds, of the lattice enthalpy of twenty metal halides, and of the partition coefficient of twenty-five organic compounds has been used to test four different complete graph, ... Keywords: Mathematical model, algorithms, chemical graphs, complete graphs, core electrons, molecular connectivity, polarizability

Lionello Pogliani

2005-01-01T23:59:59.000Z

140

Weekly Petroleum Status Report April 17, 2013  

U.S. Energy Information Administration (EIA)

Released: April 17, 2013 Weekly Petroleum Status Report --- Full report in PDF file. Highlights: Weekly Petroleum Status Report Highlights: PDF

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Foolproof completions for high rate production wells  

E-Print Network (OSTI)

Operators, especially those managing production from deepwater reservoirs, are striving to produce hydrocarbons at higher and higher rates without exposing the wells to completion failure risk. To avoid screen failures, recent studies have favored gravel pack (GP) and high rate water pack (HRWP) completions over high-permeability fracturing (HPF), known in the vernacular as a frac&pack (FP) for very high rate wells. While a properly designed GP completion may prevent sand production, it does not stop formation fines migration, and, over time, fines accumulation in the GP will lead to increasing completion skin. Although, and not always, the skin can be removed by acidizing, it is not practical to perform repeated acid treatments on deepwater wells, particularly those with subsea wellheads, and the alternative has been to subject the completion to increasingly high drawdown, accepting a high skin effect. A far better solution is to use a HPF completion. Of course the execution of a successful HPF is not a trivial exercise, and frequently, there is a steep learning curve for such a practice. This work explains the importance to HPF completions of the well trajectory through the interval to be hydraulically fractured, for production, not execution, reasons. A new model quantifies the effect of the well inclination on the connectivity between the fracture and the well via perforations. Guidelines based on the maximum target production rate, including forecasts of multiphase flow, are provided to size the HPF completion to avoid common completion failures that may result from high fluid rate and/or fines movement. Skin model will be developed for both vertical and deviated wells. Once the HPF is properly designed and executed, the operators should end up with a long term low skin good completion quality well. The well will be safely produced at the maximum flow rates, with no need for well surveillance and monitoring.

Tosic, Slavko

2007-12-01T23:59:59.000Z

142

Distributed Generation Status Update  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 DOE Peer Review Presentation 0 DOE Peer Review Presentation © Chevron 2010 CERTS Microgrid Demonstration with Large scale Energy Storage & Renewable Generation November 5, 2010 Presented By: Craig Gee, Project Manager (for Mr. Eduardo Alegria - Principal Investigator) Energy Solutions November 2010 DOE Peer Review Presentation © Chevron 2010 Agenda * Introduction - Who we are * Project Team & Site * Project Purpose & Objectives * Project Impacts * System Elements * Project Status * Research Elements * Recent Developments in California * Questions & Comments November 2010 DOE Peer Review Presentation © Chevron 2010 Chevron Energy Solutions Designed & Implemented over 900 Projects in the U.S.  Chevron ES, a division of Chevron USA, Inc. is committed to delivering economically & environmentally advantageous green

143

June 2013, FTCP Senior Technical Safety Manager (STSM) Status Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FEDERAL TECHNICAL CAPABILITY PANEL FEDERAL TECHNICAL CAPABILITY PANEL SENIOR TECHNICAL SAFETY MANAGER STATUS REPORT U.S. Department of Energy Washington, D.C. 20585 June 2013 FEDERAL TECHNICAL CAPABILITY PANEL List of Senior Technical Safety Manager (STSM) Positions ORGANIZATION: Office of Environmental Management - Carlsbad Field Office 2 Position Title Incumbent Base Requirements Compensatory Measures Qualification Status Comments Technical Degree Experience Manager Carlsbad Field Office Jose R. Franco Yes Yes No Complete Deputy Manager, Carlsbad Field Office Vacant Director for the Office of Site Operations Donald "Casey" Gadbury Yes Yes No Complete Director for the Office of Environment, Safety and Health/CBFO FTCP Agent George T. Basabilvazo Yes Yes No Complete 3 FEDERAL TECHNICAL CAPABILITY PANEL

144

June 2013, FTCP Senior Technical Safety Manager (STSM) Status Report  

NLE Websites -- All DOE Office Websites (Extended Search)

FEDERAL TECHNICAL CAPABILITY PANEL FEDERAL TECHNICAL CAPABILITY PANEL SENIOR TECHNICAL SAFETY MANAGER STATUS REPORT U.S. Department of Energy Washington, D.C. 20585 June 2013 FEDERAL TECHNICAL CAPABILITY PANEL List of Senior Technical Safety Manager (STSM) Positions ORGANIZATION: Office of Environmental Management - Carlsbad Field Office 2 Position Title Incumbent Base Requirements Compensatory Measures Qualification Status Comments Technical Degree Experience Manager Carlsbad Field Office Jose R. Franco Yes Yes No Complete Deputy Manager, Carlsbad Field Office Vacant Director for the Office of Site Operations Donald "Casey" Gadbury Yes Yes No Complete Director for the Office of Environment, Safety and Health/CBFO FTCP Agent George T. Basabilvazo Yes Yes No Complete 3 FEDERAL TECHNICAL CAPABILITY PANEL

145

Environmental Management Completed Projects 2005-Present  

Energy.gov (U.S. Department of Energy (DOE))

This document provides thelist of completed EM cleanup projects from various sites across the country from 2005 topresent, along with the each projects performance related to cost, schedule, and...

146

Princeton Plasma Physics Laboratory achieves milestone, completing...  

NLE Websites -- All DOE Office Websites (Extended Search)

of the upgrade that will make the device the most advanced fusion facility of its kind on earth. Completion of the first quadrant entailed some anxious moments. Riding on the...

147

Querying partially sound and complete data sources  

Science Conference Proceedings (OSTI)

When gathering data from multiple data sources, users need uniform, transparent access to data. Also, when extracting data from several independent, often only partially sound and complete data sources, it is useful to present users with meta-information ...

Alberto O. Mendelzon; George A. Mihaila

2001-05-01T23:59:59.000Z

148

Complete Reducibility in Euclidean Twin Buildings  

E-Print Network (OSTI)

Completely reducible subcomplexes of spherical buildings was defined by J.P. Serre and are used in studying subgroups of reductive algebraic groups. We begin the study of completely reducible subcomplexes of twin buildings and how they may be used to study subgroups of algebraic groups over a ring of Laurent polynomials and Kac-Moody groups by looking at the Euclidean twin building case.

Dawson, Denise K

2011-01-01T23:59:59.000Z

149

Foothills pipeline project prebuild being completed  

Science Conference Proceedings (OSTI)

September 1982 marked the completion of the 395-mile eastern leg of the Alaska Highway Gas Pipeline project; the western leg went into service in October 1981. The design capacities are, respectively, 1.075 billion and 240 million CF/day. Phase 11 of the project will consist of installing the northern, large-diameter sections in Alberta, British Columbia, the Yukon, and Alaska, along with additional facilities on the two completed legs.

Stewart, M.E.

1982-06-01T23:59:59.000Z

150

Property:CompletionNotes | Open Energy Information  

Open Energy Info (EERE)

CompletionNotes CompletionNotes Jump to: navigation, search Property Name CompletionNotes Property Type Text Description List of data that still needs to be researched and entered for the NEPA document Subproperties This property has the following 2 subproperties: C CA-96062042 D DOI-BLM-CA-ES-2013-002+1793-EIS Pages using the property "CompletionNotes" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 8/2: Data reviewed for completion C CA-017-05-051 + 8/9 Data entry complete. Attached FONSI does not seem to be fully related to the attached EA. The FONSI is for a geothermal well and slimhole exploration project and the EA is for a pipeline project. Need to add Public Health and Safety as a resource 8/22/13 - The 'FONSI/DR is actually for EA CA-170-02-15 Bassalt Canyon..dated Jan 2002 KW 8/26/13 - I deleted the FONSI from this page. Filename is incorrect for the file and stands as "CA-017-05-51-EA-DR -FONSI.pdf," Andrew Gentile. Unable to find Final EA or FONSI online. When RMP added, add "Inyo National Forest "Land and Resource Management Plan" (LRMP) 1988"

151

Mg acceptor doping of In{sub 2}O{sub 3} and overcompensation by oxygen vacancies  

Science Conference Proceedings (OSTI)

Mg-doped indium oxide (In{sub 2}O{sub 3}) thin films were grown by plasma-assisted molecular beam epitaxy with Mg-concentrations ranging from 10{sup 17} to 6 Multiplication-Sign 10{sup 20} cm{sup -3}. In this concentration range Mg was incorporated into In{sub 2}O{sub 3} without discernable impediment nor formation of secondary phases. Despite the role of Mg as acceptor, the films were n-type conductive in the as-grown state or after annealing in vacuum. For Mg-concentrations well in excess of the unintentional donor concentration annealing in oxygen resulted in semi-insulating films without detectable p-type conductivity. These results strongly suggest oxygen vacancies to act as shallow donors in In{sub 2}O{sub 3} that can overcompensate the Mg acceptors.

Bierwagen, Oliver; Speck, James S. [Department of Materials, University of California, Santa Barbara, California 93106 (United States)

2012-09-03T23:59:59.000Z

152

Vacancy-driven anisotropic defect distribution in the battery-cathode material LiFePO4  

Science Conference Proceedings (OSTI)

Li-ion mobility in LiFePO{sub 4}, a key property for energy applications, is impeded by Fe antisite defects (Fe{sub Li}) that form in select b-axis channels. Here we combine first-principles calculations, statistical mechanics, and scanning transmission electron microscopy to identify the origin of the effect: Li vacancies (V{sub Li}) are confined in one-dimensional b-axis channels, shuttling between neighboring Fe{sub Li}. Segregation in select channels results in shorter Fe{sub Li}-Fe{sub Li} spans, whereby the energy is lowered by the V{sub Li}'s spending more time bound to end-point Fe{sub Li}'s. V{sub Li}-Fe{sub Li}-V{sub Li} complexes also form, accounting for observed electron energy loss spectroscopy features.

Lee, Jaekwang [Vanderbilt University; Zhou, Wu [Vanderbilt University; Idrobo Tapia, Juan C [ORNL; Pennycook, Stephen J [ORNL; Pantelides, Sokrates T. [Vanderbilt University; Biegalski, Michael D [ORNL

2011-01-01T23:59:59.000Z

153

Effects of solute and vacancy segregation on antiphase boundary migration in stoichiometric and Al-rich Fe?Al: a phase-field simulation study  

E-Print Network (OSTI)

Effects of segregation of solute atoms and vacancies on migration of antiphase boundaries (APBs) in stoichiometric (Fe-25 at%Al) and Al-rich (Fe-28 at%Al) Fe?Al at 673 K have been studied using a phase-field method in which ...

Koizumi, Yuichiro

154

U.S. And Russia Complete Nuclear Security Upgrades Under Bratislava  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

And Russia Complete Nuclear Security Upgrades Under Bratislava And Russia Complete Nuclear Security Upgrades Under Bratislava Initiative U.S. And Russia Complete Nuclear Security Upgrades Under Bratislava Initiative December 23, 2008 - 9:18am Addthis WASHINGTON, DC -The U.S. Department of Energy today delivered the Bratislava Nuclear Security report to the White House, which detailed the status of work agreed to by Presidents Bush and Putin in Bratislava in 2005. U.S. and Russian officials from the U.S. Department of Energy's National Nuclear Security Administration (NNSA), the U.S. Department of Defense, the Russian Ministry of Defense and State Atomic Energy Corporation "Rosatom" reviewed work to complete nuclear security upgrades in Russia at meetings in Moscow last week. Building on this success, both

155

The Effect of Structural Vacancies on the Thermoelectric Properties of (Cu2Te)1-x(Ga2Te3)x  

SciTech Connect

We have studied the effects of structural vacancies on the thermoelectric properties of the ternary compounds (Cu2Te)1-x(Ga2Te3)x (x = 0.5, 0.55, 0.571, 0.6, 0.625, 0.667 and 0.75), which are solid solutions found in the pseudo-binary phase diagram for Cu2Te and Ga2Te3. This system possesses tunable structural vacancy concentrations. The x= 0.5 phase, CuGaTe2, is nominally devoid of structural vacancies, while the rest of the compounds contain varying amounts of these features, and the volume density of vacancies increases with Ga2Te3 content. The sample with x = 0.5, 0.55, 0.571, 0.6, 0.625 crystallize in the chalcopyrite structure while the x = 0.667 and 0.75 adopt the Ga2Te3 defect zinc blende structure. Strong scattering of heat carrying phonons by structural defects, leads to the reduction of thermal conductivity, which is beneficial to the thermoelectric performance of materials. On the other hand, these defects also scatter charge carriers and reduce the electrical conductivity. All the samples investigated are p-type semiconductors as inferred by the signs of their respective Hall (RH) and Seebeck (S) coefficients. The structural vacancies were found to scatter phonons strongly, while a combination of increased carrier concentration, and vacancies decreases the Hall mobility ( H), degrading the overall thermoelectric performance. The room temperature H drops from 90 cm2/V s for CuGaTe2 to 13 cm2/V s in Cu9Ga11Te21 and 4.6 cm2/V s in CuGa3Te5. The low temperature thermal conductivity decreases significantly with higher Ga2Te3 concentrations (higher vacancy concentration) due to increased point defect scattering which dominate thermal resistance terms. At high temperatures, the dependence of thermal conductivity on the Ga2Te3 content is less significant. The presence of strong Umklapp scattering leads to low thermal conductivity at high temperatures for all samples investigated. The highest ZT among the samples in this study was found for the defect-free CuGaTe2 with ZT ~ 1.0 at 840K.

Ye, Zuxin [GM Research and Development Center; Cho, Jung Y [GM R& D and Planning, Warren, Michigan; Tessema, Misle [GM Research and Development Center; Salvador, James R. [GM R& D and Planning, Warren, Michigan; Waldo, Richard [GM R& D and Planning, Warren, Michigan; Wang, Hsin [ORNL; Cai, Wei [ORNL

2013-01-01T23:59:59.000Z

156

Fuel Cell Development Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Development Status Michael Short Systems Engineering Manager United Technologies Corporation Research Center Hamilton Sundstrand UTC Power UTC Fire & Security Fortune 50 corporation $52.9B in annual sales in 2009 ~60% of Sales are in building technologies Transportation Stationary Fuel Cells Space & Defense * Fuel cell technology leader since 1958 * ~ 550 employees * 768+ Active U.S. patents, more than 300 additional U.S. patents pending * Global leader in efficient, reliable, and sustainable fuel cell solutions UTC Power About Us PureCell ® Model 400 Solution Process Overview Power Conditioner Converts DC power to high-quality AC power 3 Fuel Cell Stack Generates DC power from hydrogen and air 2 Fuel Processor Converts natural gas fuel to hydrogen

157

DFC Technology Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Pinakin Patel Pinakin Patel Mohammad Farooque FuelCell Energy, Inc. 3 Great Pasture Road Danbury, Ct 06813 DFC Technology Status * Distributed generation puts power where it's needed * Increases power reliability * Near zero emissions allow units to be sited almost anywhere - even polluted urban areas * Reduces need for central generation plants * Reduces grid congestion and need for new transmission lines * Distributed generation enables smart grid * Balances the grid with 24/7 power * Meets requirements for low carbon technology * Smaller projects enable faster permitting, financing, and execution DFC power plant is an enabler for broad distributed generation 600 kW at M&L Commodities Distributed Generation FuelCell Energy Products Fuel Cell Stack DFC300 Single Module

158

RIA Overview and Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Science Office of Science U.S. Department of Energy Guy Savard Argonne National Laboratory & University of Chicago Based on Material presented at the ATLAS Operation's Review December 8-10, 2003 by The Californium Source Upgrade 2 Pioneering Science and Technology Office of Science U.S. Department of Energy 12/8-10/2003 ATLAS Upgrade Guy Savard ATLAS Status * ATLAS only low-energy accelerator for stable ions operating as a User Facility with well documented characteristics (reliability, beam quality, transmission, timing,...) * Excellent and varied physics program with a large User community * What lies ahead for ATLAS * Maintain position as premier low-energy heavy ion accelerator * Address open physics/technical questions leading to RIA * Help the community in the "pre-RIA"

159

Lab completes Recovery Act-funded demolition  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery Act-funded demolition completed Recovery Act-funded demolition completed Lab completes Recovery Act-funded demolition The building was the largest of the 24 demolished at LANL's historic Technical Area 21. January 19, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Contact Fred deSousa Communications Office (505) 665-3430

160

NP-complete Problems and Physical Reality  

E-Print Network (OSTI)

Can NP-complete problems be solved efficiently in the physical universe? I survey proposals including soap bubbles, protein folding, quantum computing, quantum advice, quantum adiabatic algorithms, quantum-mechanical nonlinearities, hidden variables, relativistic time dilation, analog computing, Malament-Hogarth spacetimes, quantum gravity, closed timelike curves, and "anthropic computing." The section on soap bubbles even includes some "experimental" results. While I do not believe that any of the proposals will let us solve NP-complete problems efficiently, I argue that by studying them, we can learn something not only about computation but also about physics.

Scott Aaronson

2005-02-12T23:59:59.000Z

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Completion fluids: a generic overview. Part 2  

SciTech Connect

This work defines how clean completion fluids should be obtained onsite by implementing cleaner operational practices and using progressive solids removal steps, so that final fine filtration can be effective. Several current final filtration techniques are discussed and evaluated. Due to the variability in solids loading during completion operations, a number of solids removal steps are recommended to enhance the filtration process toward a solids-free system. In order of descending particle size removal, the equipment needed includes a shale shaker, settling tank, desilter, centrifugal separator, and final polishing filters. 25 references.

Ammerer, N.H.; Hashemi, R.; Jewell, J.E.

1983-06-01T23:59:59.000Z

162

Area 410 status and capabilities  

SciTech Connect

This memo is distributed to acquaint personnel with (a) the status of the various 410 areas, (b) time and personnel required to do optic experiments in the ``Dog`` area, and (c) status of the timing and firing system and conditions of cables from Able to Dog.

Bennett, W. P.

1962-10-01T23:59:59.000Z

163

NGNP Engineering Status  

SciTech Connect

The objectives of Phase 1 Engineering and Design scope are to: 1) complete the initial design activities for a prototype nuclear reactor and plant that is capable of co-generating electricity, hydrogen, and process heat; 2) identify technological aspects of the NGNP that need further advancement by research and development activities; and 3) provide engineering support to the early licensing process, including technical input to white papers and developing the basis for future safety analyses.

John Collins

2010-08-01T23:59:59.000Z

164

Retrofitting Urban Arterials Into Complete Streets  

E-Print Network (OSTI)

speeds reduce mobility and increase costs for all vehicles Required to design to Level of Service C with Federal highway standards and guidelines Slower speeds reduce mobility and increase costs for all in Complete Streets Conflicts with National Guidelines #12;ITE New Recommended Practice Designing Walkable

Bertini, Robert L.

165

STIMULATION TECHNOLOGIES FOR DEEP WELL COMPLETIONS  

SciTech Connect

The Department of Energy (DOE) is sponsoring a Deep Trek Program targeted at improving the economics of drilling and completing deep gas wells. Under the DOE program, Pinnacle Technologies is conducting a project to evaluate the stimulation of deep wells. The objective of the project is to assess U.S. deep well drilling & stimulation activity, review rock mechanics & fracture growth in deep, high pressure/temperature wells and evaluate stimulation technology in several key deep plays. Phase 1 was recently completed and consisted of assessing deep gas well drilling activity (1995-2007) and an industry survey on deep gas well stimulation practices by region. Of the 29,000 oil, gas and dry holes drilled in 2002, about 300 were drilled in the deep well; 25% were dry, 50% were high temperature/high pressure completions and 25% were simply deep completions. South Texas has about 30% of these wells, Oklahoma 20%, Gulf of Mexico Shelf 15% and the Gulf Coast about 15%. The Rockies represent only 2% of deep drilling. Of the 60 operators who drill deep and HTHP wells, the top 20 drill almost 80% of the wells. Six operators drill half the U.S. deep wells. Deep drilling peaked at 425 wells in 1998 and fell to 250 in 1999. Drilling is expected to rise through 2004 after which drilling should cycle down as overall drilling declines.

Stephen Wolhart

2003-06-01T23:59:59.000Z

166

Complete Orders, Categories and Lattices of Approximations  

Science Conference Proceedings (OSTI)

The present article deals with the problem whether and how the bilattice orderings of knowledge ⩽$_k$ and truth ⩽$_t$ might enrich the theory of rough sets. Passing to the chief idea of the paper, we develop a bilattice-theoretic generalisation ... Keywords: *-autonomous category, Chu construction, Nelson lattice, approximation, bilattice, complete partial order, rough set

Marcin Wolski

2006-09-01T23:59:59.000Z

167

NNSA Completes B61 Warhead Refurbishment | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

B61 Warhead Refurbishment NNSA Completes B61 Warhead Refurbishment June 30, 2006 Washington, DC NNSA Completes B61 Warhead Refurbishment NNSA completed a six-year effort...

168

HANFORD SITE CENTRAL PLATEAU CLEANUP COMPLETION STRATEGY  

SciTech Connect

Cleanup of the Hanford Site is a complex and challenging undertaking. The U.S. Department of Energy (DOE) has developed a comprehensive vision for completing Hanford's cleanup mission including transition to post-cleanup activities. This vision includes 3 principle components of cleanup: the {approx}200 square miles ofland adjacent to the Columbia River, known as the River Corridor; the 75 square miles of land in the center of the Hanford Site, where the majority of the reprocessing and waste management activities have occurred, known as the Central Plateau; and the stored reprocessing wastes in the Central Plateau, the Tank Wastes. Cleanup of the River Corridor is well underway and is progressing towards completion of most cleanup actions by 2015. Tank waste cleanup is progressing on a longer schedule due to the complexity of the mission, with construction of the largest nuclear construction project in the United States, the Waste Treatment Plant, over 50% complete. With the progress on the River Corridor and Tank Waste, it is time to place increased emphasis on moving forward with cleanup of the Central Plateau. Cleanup of the Hanford Site has been proceeding under a framework defmed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In early 2009, the DOE, the State of Washington Department of Ecology, and the U.S. Environmental Protection Agency signed an Agreement in Principle in which the parties recognized the need to develop a more comprehensive strategy for cleanup of the Central Plateau. DOE agreed to develop a Central Plateau Cleanup Completion Strategy as a starting point for discussions. This DOE Strategy was the basis for negotiations between the Parties, discussions with the State of Oregon, the Hanford Advisory Board, and other Stakeholder groups (including open public meetings), and consultation with the Tribal Nations. The change packages to incorporate the Central Plateau Cleanup Completion Strategy were signed by the Parties on October 26,2010, and are now in the process of being implemented.

BERGMAN TB

2011-01-14T23:59:59.000Z

169

SNS Operating Status | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

SNS Operating Status Current Beam Status 101713 11:43 Beam is back on target at 485 kW. Power increases will occur throughout the day. Status, Schedules & Alerts Energy and...

170

July 2012, Work Force Retention Work Group Status Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Force Retention Work Group Status Overview Work Force Retention Work Group Status Overview Accomplishments: 1. Progress on the completion of the 10 CFR 1046 modifications to address barriers to workforce retention. Written response to public comment is being drafted by HS-51. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce retention in over 20 years. 3. Draft re-charter of PF Career Options Committee (PFCOC) to establish a PF Working Group approved by GC-63 and GC NNSA. Near Term Goals and Activities: 1. Publish 1046 as a final rule - anticipated completion no later than September, assuming timely OMB review and approval. 2. Draft PF Working Group charter final review by senior management to be

171

Completion techniques for geothermal-geopressured wells. Final report  

DOE Green Energy (OSTI)

The following are covered: oil well completions, water well completions, sand control techniques, geopressured oil and gas wells, and geopressured water well completion. The conclusions for a geothermal-geopressured water well completion and needed research are included. (MHR)

Boyd, W.E.

1974-01-01T23:59:59.000Z

172

SNS Operations Status Update | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

Home SNS Operations Status Update SNS Operations Status Update - November 29, 2012 Resumption of SNS Operations and User Program Neutron production resumed on November 29,...

173

Lab completes record year for environmental cleanup  

NLE Websites -- All DOE Office Websites (Extended Search)

Record year for environmental cleanup Record year for environmental cleanup Lab completes record year for environmental cleanup Personnel conducted more field investigations and cleanup campaigns than ever and completed a record number of Lab shipments to WIPP. December 16, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

174

Stimulation Technologies for Deep Well Completions  

SciTech Connect

The Department of Energy (DOE) is sponsoring the Deep Trek Program targeted at improving the economics of drilling and completing deep gas wells. Under the DOE program, Pinnacle Technologies is conducting a study to evaluate the stimulation of deep wells. The objective of the project is to assess U.S. deep well drilling & stimulation activity, review rock mechanics & fracture growth in deep, high pressure/temperature wells and evaluate stimulation technology in several key deep plays. An assessment of historical deep gas well drilling activity and forecast of future trends was completed during the first six months of the project; this segment of the project was covered in Technical Project Report No. 1. The second progress report covers the next six months of the project during which efforts were primarily split between summarizing rock mechanics and fracture growth in deep reservoirs and contacting operators about case studies of deep gas well stimulation.

None

2003-09-30T23:59:59.000Z

175

Geothermal drilling and completion technology development  

SciTech Connect

The high cost of drilling and completing geothermal wells is an impediment to the development of geothermal energy resources. Technological deficiencies in rotary drilling techniques are evidenced when drilling geothermal wells. The Division of Geothermal Energy (DGE) of the U.S. Department of Energy has initiated a program aimed at developing new drilling and completion techniques for geothermal wells. The goals of this program are to reduce well costs by 25% by 1982 and by 50% by 1986. Sandia Laboratories has been selected to manage this technology development program, and this paper presents an overview of the program. Program justification which relates well cost to busbar energy cost and to DGE power-on-line goals is presented. Technological deficiencies in current rotary drilling techniques for geothermal wells are discussed. A program for correcting these deficiencies is described.

Varnado, S.G.; Stoller, H.M.

1978-01-01T23:59:59.000Z

176

Process development status report for advanced manufacturing projects  

Science Conference Proceedings (OSTI)

This is the final status report for the approved Advanced Manufacturing Projects for FY 1989. Five of the projects were begun in FY 1987, one in FY 1988, and one in FY 1989. The approved projects cover technology areas in welding, explosive material processing and evaluation, ion implantation, and automated manufacturing. It is expected that the successful completion of these projects well result in improved quality and/or reduced cost for components produced by Mound. Those projects not brought to completion will be continued under Process development in FY 1990.

Brinkman, J.R.; Homan, D.A.

1990-03-30T23:59:59.000Z

177

SF-4400-ATS Affidavit of Tax Status  

NLE Websites -- All DOE Office Websites (Extended Search)

ATS (07-2012) ATS (07-2012) SANDIA PROPRIETARY INFORMATION PERSONALLY IDENTIFIABLE INFORMATION (PII) (WHEN COMPLETE) Affidavit of Tax Status Benefits paid under a group health plan for your covered dependents who do not qualify for tax-free health coverage under the Internal Revenue Code causes you to receive additional compensation as taxable wages. Generally, same-gender domestic partners and their children do not qualify for tax-free health coverage and are, therefore, considered Non- Qualifying Dependents. You are required to declare as taxable income the value (imputed income) of the coverage for your Non-Qualifying Dependent(s). Imputed income is not a pay increase. It is the value of Sandia's contributions for medical (including the Health Reimbursement Account, if applicable), dental, and/or vision coverage for dependents who do not

178

Hybrid Arc Cell Studies: Status Report  

SciTech Connect

I report on the status, at the end of FY12, of the studies of an arc cell for a hybrid synchrotron accelerating from 375 GeV/c to 750 GeV/c in momentum. Garren produced a complete lattice that gives a good outline of the structure of a hybrid synchrotron lattice. It is, however, lacking in some details: it does not maintain a constant time of flight, it lacks chromaticity correction, its cell structure is not ideal for removing aberrations from chromaticity correction, and it probably needs more space between magnets. I have begun studying cell structures for the arc cells to optimize the lattice performance and cost. I present some preliminary results for two magnets per half cell. I then discuss difficulties encountered, some preliminary attempts at resolving them, and the future plans for this work.

Berg J. S.

2012-09-28T23:59:59.000Z

179

ILC Marx Modulator Development Program Status  

DOE Green Energy (OSTI)

Development of a first generation prototype (P1) Marx-topology klystron modulator for the International Linear Collider is nearing completion at the Stanford Linear Accelerator Center. It is envisioned as a smaller, lower cost, and higher reliability alternative to the present, bouncer-topology, 'Baseline Conceptual Design'. The Marx presents several advantages over conventional klystron modulator designs. It is physically smaller; there is no pulse transformer (quite massive at ILC parameters) and the energy storage capacitor bank is quite small, owing to the active droop compensation. It is oil-free; voltage hold-off is achieved using air insulation. It is air cooled; the secondary air-water heat exchanger is physically isolated from the electronic components. The P1-Marx employs all solid state elements; IGBTs and diodes, to control the charge, discharge and isolation of the cells. A general overview of the modulator design and the program status are presented.

Burkhart, C.; Beukers, T.; Larsen, R.; Macken, K.; Nguyen, M.; Olsen, J.; Tang, T.; /SLAC

2009-03-04T23:59:59.000Z

180

Status of the Magma Energy Project  

DOE Green Energy (OSTI)

The current magma energy project is assessing the engineering feasibility of extracting thermal energy directly from crustal magma bodies. The estimated size of the US resource (50,000 to 500,000 quads) suggests a considerable potential impact on future power generation. In a previous seven-year study, we concluded that there are no insurmountable barriers that would invalidate the magma energy concept. Several concepts for drilling, energy extraction, and materials survivability were successfully demonstrated in Kilauea Iki lava lake, Hawaii. The present program is addressing the engineering design problems associated with accessing magma bodies and extracting thermal energy for power generation. The normal stages for development of a geothermal resource are being investigated: exploration, drilling and completions, production, and surface power plant design. Current status of the engineering program and future plans are described. 20 refs., 12 figs.

Dunn, J.C.

1987-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Business Plan Process Status Update  

Business Plan Process Status Update 2009: 10 - Business schools visited or contacted in Bay Area to date (CSEB, GGU, SCU, SJSU, Stanford, St. Marys, UCB, UCD, UOP ...

182

Status of Oregon's Bull Trout.  

Science Conference Proceedings (OSTI)

Limited historical references indicate that bull trout Salvelinus confluentus in Oregon were once widely spread throughout at least 12 basins in the Klamath River and Columbia River systems. No bull trout have been observed in Oregon's coastal systems. A total of 69 bull trout populations in 12 basins are currently identified in Oregon. A comparison of the 1991 bull trout status (Ratliff and Howell 1992) to the revised 1996 status found that 7 populations were newly discovered and 1 population showed a positive or upgraded status while 22 populations showed a negative or downgraded status. The general downgrading of 32% of Oregon's bull trout populations appears largely due to increased survey efforts and increased survey accuracy rather than reduced numbers or distribution. However, three populations in the upper Klamath Basin, two in the Walla Walla Basin, and one in the Willamette Basin showed decreases in estimated population abundance or distribution.

Buchanan, David V.; Hanson, Mary L.; Hooton, Robert M.

1997-10-01T23:59:59.000Z

183

Fusion technology status and requirements  

SciTech Connect

This paper summarizes the status of fusion technology and discusses the requirements to be met in order to build a demonstration fusion plant. Strategies and programmatic considerations in pursuing engineering feasibility are also outlined.

Thomassen, K.I.

1982-01-26T23:59:59.000Z

184

Spectroscopic differentiation between O-atom vacancy and divacancy defects, respectively, in TiO2 and HfO2 by X-ray absorption spectroscopy  

Science Conference Proceedings (OSTI)

Defect state features have been detected in second derivative O K edge spectra for thin films of nano-crystalline TiO"2 and HfO"2. Based on soft X-ray photoelectron band edge spectra, and the occurrence of occupied band edge 4f states in Gd(Sc,Ti)O"3, ... Keywords: Bound resonance states, Divacancies, Immobile and mobile vacancies, Monovacancies, Pre-edge regime, X-ray absorption spectroscopy

G. Lucovsky; K. -B. Chung; J. -W. Kim; D. Norlund

2009-07-01T23:59:59.000Z

185

O-vacancies in transition metal (TM) oxides: Coordination and local site symmetry of transition and negative ion states in TM2O3 and TMO2 oxides  

Science Conference Proceedings (OSTI)

Removal of neutral O-atoms from a transition metal (TM) oxide results in two electrons residing within the vacated site. Two-electron multiplet theory has been used to develop a d^2equivalent model. When applied to tetragonal HfO"2, the two electrons ... Keywords: Negative ion states, O-vacancy, Second derivative O K pre-edge spectra, Tanabe-Sugano diagrams, Transition metal oxides: X-ray absorption spectroscopy

G. Lucovsky; D. Zeller; J. L. Whitten

2011-07-01T23:59:59.000Z

186

Stimulation Technologies for Deep Well Completions  

SciTech Connect

The Department of Energy (DOE) is sponsoring the Deep Trek Program targeted at improving the economics of drilling and completing deep gas wells. Under the DOE program, Pinnacle Technologies conducted a study to evaluate the stimulation of deep wells. The objective of the project was to review U.S. deep well drilling and stimulation activity, review rock mechanics and fracture growth in deep, high-pressure/temperature wells and evaluate stimulation technology in several key deep plays. This report documents results from this project.

Stephen Wolhart

2005-06-30T23:59:59.000Z

187

Microsoft Word - CRC nearing completion.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Begins Final Efforts to Consolidate Tank Farm Begins Final Efforts to Consolidate Tank Farm Control Rooms Into One State-of-the-Art Facility AIKEN, S.C. (June 25, 2013) - Nearly a decade of work to consolidate six control rooms into a single facility at the Savannah River Site (SRS) tank farms is nearing completion with the recent closure of two F Tank Farm control rooms. Signing off the command and control functions of the 1F and 74F control rooms last

188

Diamond Shamrock nears completion of major expansions  

SciTech Connect

With completion later this year of a second refined products line into Colorado, Diamond Shamrock Inc., San Antonio, will have added more than 600 miles of product and crude-oil pipeline on its system and expanded charge and production capacities at its two state-of-the-art refineries, all within 30 months. The projects aim at improving the company's ability to serve markets in the U.S. Southwest and increasing capacities and flexibility at its two refineries. The paper describes these projects under the following headings: new products service; another new line; and refineries, crude pipelines; Three Rivers expansion and Supplies for McKee.

True, W.R.

1993-05-24T23:59:59.000Z

189

JEA successfully completes world's largest CFB demonstration  

Science Conference Proceedings (OSTI)

JEA (formerly the Jacksonville Electric Authority) has successfully completed an eighth year landmark demonstration project that continues in baseload commercial operation. It scales up atmospheric fluidized-bed technology demonstration to the near-300-MW size, providing important data on a technology that can achieve > 90% SO{sub 2} removal and 60% NOx reduction at relatively high efficiencies and at costs comparable to those of conventional pulverized coal plants. The article recounts the history of the project. Performance tests showed a blend of coal and petcoke were most efficient as a feedstock. 3 figs.

NONE

2005-09-30T23:59:59.000Z

190

SRS - Area Completion Projects - ARF/IRF  

NLE Websites -- All DOE Office Websites (Extended Search)

4/16/2012 4/16/2012 SEARCH GO spacer Administrative Record File/Information Repository File Federal Facility Agreement and Supporting Documentation General Information and Technologies Public Involvement Home SRS Home Area Completion Projects Administrative Record File/Information Repository File (ARF/IRF) Index of documents contained in the ARF/IRF is available at the University of South Carolina Libraries - Aiken and Columbia on microfilm and/or CD. This index is in PDF (portable document format) which requires Adobe Acrobat Reader software to be installed on your computer. Disclaimer - The scanning process used to transfer documents into the portable document format may unintentionally create minor inaccuracies in the text. The viewer is warned that minor spelling errors may occur and numerical data may be missing decimal points or exponential values. Should the viewer have any questions regarding a particular section of text, an accurate hardcopy is always available from the Area Completion Project Document Control at the Savannah River Site, Debbie Rice at 803-725-3885.

191

Stimulation Technologies for Deep Well Completions  

SciTech Connect

The Department of Energy (DOE) is sponsoring the Deep Trek Program targeted at improving the economics of drilling and completing deep gas wells. Under the DOE program, Pinnacle Technologies is conducting a study to evaluate the stimulation of deep wells. The objective of the project is to assess U.S. deep well drilling and stimulation activity, review rock mechanics and fracture growth in deep, high-pressure/temperature wells and evaluate stimulation technology in several key deep plays. An assessment of historical deep gas well drilling activity and forecast of future trends was completed during the first six months of the project; this segment of the project was covered in Technical Progress Report No. 1. During the next six months, efforts were primarily split between summarizing rock mechanics and fracture growth in deep reservoirs and contacting operators about case studies of deep gas well stimulation as documented in Technical Progress Report No. 2. This report details work done with Anadarko and ChevronTexaco in the Table Rock Field in Wyoming.

None

2004-03-31T23:59:59.000Z

192

Complete Mie-Gruneisen Equation of State  

SciTech Connect

The Mie-Gruneisen equation of state (EOS) is frequently used in hydro simulations to model solids at high pressure (up to a few Mb). It is an incomplete EOS characterized by a Gruneisen coefficient, {Lambda} = -V({partial_derivative}{sub e}P){sub V}, that is a function of only V. Expressions are derived for isentropes and isotherms. This enables the extension to a complete EOS. Thermodynamic consistency requires that the specific heat is a function of a single scaled temperature. A complete extension is uniquely determined by the temperature dependence of the specific heat at a fixed reference density. In addition we show that if the domain of the EOS extends to T = 0 and the specific heat vanishes on the zero isotherm then {Lambda} a function of only V is equivalent to a specific heat with a single temperature scale. If the EOS domain does not include the zero isotherm, then a specific heat with a single temperature scale leads to a generalization of the Mie-Gruneisen EOS in which the pressure is linear in both the specific energy and the temperature. Such an EOS has previously been used to model liquid nitromethane.

Menikoff, Ralph [Los Alamos National Laboratory

2012-06-28T23:59:59.000Z

193

PSA_Well_Completion_Report.book  

Office of Legacy Management (LM)

Restoration Restoration Project U.S. Department of Energy National Nuclear Security Administration Nevada Site Office Environmental Restoration Project U.S. Department of Energy National Nuclear Security Administration Nevada Site Office Nevada Environmental Restoration Project Well Completion Report for Corrective Action Unit 447, Project Shoal Area Churchill County, Nevada Revision No.: 0 September 2006 Approved for public release; further dissemination unlimited. DOE/NV--1166 Available for public sale, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@ntis.gov Online ordering: http://www.ntis.gov/ordering.htm Available electronically at http://www.osti.gov/bridge

194

Ozark 260-mile gas line system completed  

Science Conference Proceedings (OSTI)

Gathering gas in the Arkoma basin of Oklahoma and Arkansas for transport to market, the 260-mile Ozark gas line system runs from southwest of McAlester, Okla., to Natural Gas Pipeline Co. of America's station at Searcy, Ark. The recently completed mainline has an initial capacity of 170 million CF/day with a maximum operating pressure of 1200 psig and a delivery pressure of 700 psig at the NGPL station. The 20-in. pipeline is API 5LX-Grade X60, 0.281-in. wall thickness for Class 1 areas, 0.344 for Class 2 areas, 0.406 for Class 3 areas, and API 5LX-Grade X52, 0.500-in. wall thickness for river crossings.

Dixon, R.R.

1982-05-01T23:59:59.000Z

195

Slant hole completion test. Final report  

Science Conference Proceedings (OSTI)

One of the Department of Energy`s (DOE) Strategies and Objectives in the Natural Gas Program is to conduct activities to transfer technology from R&D programs to potential users. The Slant Hole Completion Test has achieved exactly this objective. The Slant Hole site is essentially the same as the Multiwell site and is located in the southeastern portion of the Piceance Basin near Rifle, Colorado. The Piceance Basin is typical of the Western low permeability basins that contain thick sequences of sands, silts and coals deposited during the Cretaceous period. These sequences contain vast amounts of natural gas but have proven to be resistant to commercial production because of the low permeability of the host rocks. Using the knowledge gained from the DOE`s earlier Multiwell experiment, the SHCT-1 was drilled to demonstrate that by intersecting the natural fractures found in these ``tight rocks,`` commercial gas production can be obtained.

Mann, R.L.

1993-07-01T23:59:59.000Z

196

ER-12-1 completion report  

SciTech Connect

The objective of drillhole ER-12-1 was to determine the hydrogeology of paleozoic carbonate rocks and of the Eleana Formation, a regional aquitard, in an area potentially downgradient from underground nuclear testing conducted in nearby Rainier Mesa. This objective was addressed through the drilling of well ER-12-1 at N886,640.26 E640,538.85 Nevada Central Coordinates. Drilling of the 1094 m (3588 ft) well began on July 19, 1991 and was completed on October 17, 1991. Drilling problems included hole deviation and hole instability that prevented the timely completion of this borehole. Drilling methods used include rotary tri-cone and rotary hammer drilling with conventional and reverse circulation using air/water, air/foam (Davis mix), and bentonite mud. Geologic cuttings and geophysical logs were obtained from the well. The rocks penetrated by the ER-12-1 drillhole are a complex assemblage of Silurian, Devonian, and Mississippian sedimentary rocks that are bounded by numerous faults that show substantial stratigraphic offset. The final 7.3 m (24 ft) of this hole penetrated an unusual intrusive rock of Cretaceous age. The geology of this borehole was substantially different from that expected, with the Tongue Wash Fault encountered at a much shallower depth, paleozoic rocks shuffled out of stratigraphic sequence, and the presence of an altered biotite-rich microporphyritic igneous rock at the bottom of the borehole. Conodont CAI analyses and rock pyrolysis analyses indicate that the carbonate rocks in ER-12-1, as well as the intervening sheets of Eleana siltstone, have been thermally overprinted following movement on the faults that separate them. The probable source of heat for this thermal disturbance is the microporphyritic intrusion encountered at the bottom of the hole, and its age establishes that the major fault activity must have occurred prior to 102.3+0.5 Ma (middle Cretaceous).

Russell, C.E.; Gillespie, D.; Cole, J.C.; Drellack, S.L. [and others

1996-12-01T23:59:59.000Z

197

Sediment Properties: E-Area Completion Project  

Science Conference Proceedings (OSTI)

To accommodate a future need for additional waste disposal facilities at the Savannah River Site, the Solid Waste Management Division (SWMD) designated nine additional plots for development (Kasraii 2007; SRS 2010); these plots are collectively known as the E Area Completion Project (ECP). Subsurface samples were collected from ECP plots 6, 7, 8 and 9 (Figure 1) for chemical and physical property analyses to support Performance Assessment (PA) and Special Analyses (SA) modeling. This document summarizes the sampling and analysis scheme and the resultant data, and provides interpretations of the data particularly in reference to existing soil property data. Analytical data in this document include: gamma log, cone penetrometer log, grain size (sieve and hydrometer), water retention, saturated hydraulic conductivity (falling head permeameter), porosity, dry bulk density, total organic carbon, x-ray diffraction, and x-ray fluorescence data. SRNL provided technical and safety oversight for the fieldwork, which included completion of eight soil borings, four geophysical logs, and the collection of 522 feet of core and 33 Shelby tubes from ECP plots 6, 7, 8, and 9. Boart Longyear provided sonic drilling and logging services. Two soil borings were completed at each location. The first set of boreholes extended into (but did not fully penetrate) the Warley Hill Formation. These boreholes were continuously cored, then geophysically (gamma ray) logged. The recovered core was split, photographed, and described; one half of the core was archived at SRS's Core Lab facilities, and the remaining half was consumed as necessary for testing at SRS and off-site labs. Core descriptions and geophysical data were used to calculate target elevations for Shelby tube samples, which were obtained from the second set of boreholes. Shelby tubes were shipped to MACTEC Engineering and Consulting Inc. (MACTEC) in Atlanta for physical property testing. SRNL deployed their Site Characterization and Analysis Penetrometer System (SCAPS) cone penetrometer test (CPT) truck at ECP plots 6, 7, 8 and 9 to collect inferred lithology data for the vadose zone. Results from this study are used to make recommendations for future modeling efforts involving the ECP plots. The conceptual model of the ECP hydrogeology differs from the conceptual model of the current ELLWF disposal area in that for the ECP plots, the topography (ground surface) is generally lower in elevation; The Upland and top of Tobacco Road lithostratigraphic units are missing (eroded); The water table occurs lower in elevation (i.e., it occurs in lower stratigraphic units); and the Tan Clay Confining Zone (TCCZ) often occurs within the vadose zone (rather than in the saturated zone). Due to the difference in the hydrogeology between the current ELLWF location and the ECP plots, different vadose zone properties are recommended for the ECP plots versus the properties recommended by Phifer et al. (2006) for the current disposal units. Results from this study do not invalidate or conflict with the current PA's use of the Upper and Lower Vadose Zone properties as described by Phifer et al. (2006) for the current ELLWF disposal units. The following modeling recommendations are made for future modeling of the ECP plots where vadose zone properties are required: (1) If a single vadose zone property is preferred, the properties described by Phifer et al. (2006) for the Upper Vadose Zone encompass the general physical properties of the combined sands and clays in the ECP vadose zone sediments despite the differences in hydrostratigraphic units. (2) If a dual zone system is preferred, a combination of the Lower Zone properties and the Clay properties described by Phifer et al. (2006) are appropriate for modeling the physical properties of the ECP vadose zone. The Clay properties would be assigned to the Tan Clay Confining Zone (TCCZ) and any other significant clay layers, while the Lower Zone properties would be assigned for the remainder of the vadose zone. No immediate updates or changes are recommended for

Millings, M.; Bagwell, L.; Amidon, M.; Dixon, K.

2011-04-29T23:59:59.000Z

198

Entiat 4Mile WELLs Completion Report, 2006.  

DOE Green Energy (OSTI)

The Entiat 4-mile Wells (Entiat 4-mile) project is located in the Entiat subbasin and will benefit Upper Columbia steelhead, spring Chinook and bull trout. The goal of this project is to prevent juvenile fish from being diverted into an out-of-stream irrigation system and to eliminate impacts due to the annual maintenance of an instream pushup dam. The objectives include eliminating a surface irrigation diversion and replacing it with two wells, which will provide Bonneville Power Administration (BPA) and the Bureau of Reclamation (Reclamation) with a Federal Columbia River Power System (FCRPS) BiOp metric credit of one. Wells were chosen over a new fish screen based on biological benefits and costs. Long-term biological benefits are provided by completely eliminating the surface diversion and the potential for fish entrainment in a fish screen. Construction costs for a new fish screen were estimated at $150,000, which does not include other costs associated with implementing and maintaining a fish screening project. Construction costs for a well were estimated at $20,000 each. The diversion consisted of a pushup dam that diverted water into an off-channel pond. Water was then pumped into a pressurized system for irrigation. There are 3 different irrigators who used water from this surface diversion, and each has multiple water right claims totaling approximately 5 cfs. Current use was estimated at 300 gallons per minute (approximately 0.641 cfs). Some irrigated acreage was taken out of orchard production less than 5 years ago. Therefore, approximately 6.8 acre-feet will be put into the State of Washington Trust Water Right program. No water will be set aside for conservation savings. The construction of the two irrigation wells for three landowners was completed in September 2006. The Lower Well (Tippen/Wick) will produce up to 175 gpm while the Upper Well (Griffith) will produce up to 275 gpm during the irrigation season. The eight inch diameter wells were developed to a depth of 75 feet and 85 feet, respectively, and will be pumped with Submersible Turbine pumps. The irrigation wells have been fitted with new electric boxes and Siemens flowmeters (MAG8000).

Malinowksi, Richard

2007-01-01T23:59:59.000Z

199

ABB`s LEBS activities -- A status report  

SciTech Connect

ABB Combustion Engineering, Inc. is one of three contractors executing Phases 1, 2 and 3 of the Department of Energy project entitled Engineering Development of Advanced Coal-Fired Low-Emission Boiler Systems (LEBS). Phase 1 has been completed and Phase 2 is scheduled for completion on September 30, 1996. The following major activities are being carried out in parallel in Phase 2 and this paper is a status report on this work: (1) in-furnace NOx reduction; (2) catalytic filter optimization; (3) add Kalina cycle to POCTF; and (4) POCTF design and licensing. The in-furnace NOx reduction work has been completed and, therefore, a description of this work comprises the major part of this paper.

Regan, J.W.; Hein, R.J. von [ABB Power Plant Labs. (United States); Peletz, L.J. Jr. [ABB CE Utility Power Boilers (United States); Wesnor, J.D. [ABB Environmental Systems (United States); Bender, D.J. [Raytheon Engineers and Constructors (United States)

1996-12-31T23:59:59.000Z

200

DOE Seeks Commercial Storage to Complete Fill of Northeast Home...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Seeks Commercial Storage to Complete Fill of Northeast Home Heating Oil Reserve DOE Seeks Commercial Storage to Complete Fill of Northeast Home Heating Oil Reserve August 26,...

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Complexity of the positive semidefinite matrix completion problem ...  

E-Print Network (OSTI)

This follows directly from Lemma 2.2 combined with Theorem. 3.2: By Lemma 2.2 , ..... The real positive defi- nite completion problem: cycle completability.

202

Recovery Act Workers Complete Environmental Cleanup of Coal Ash...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Complete Environmental Cleanup of Coal Ash Basin Recovery Act Workers Complete Environmental Cleanup of Coal Ash Basin The Savannah River Site (SRS) recently cleaned up a 17-acre...

203

October 25, 2001, DOE letter reporting completion of commitment...  

NLE Websites -- All DOE Office Websites (Extended Search)

The following commitment is proposed for closure: 229 Complete dissolution of RFETS scrub alloy at SRS. - September 2001 Dissolution of the scrub alloy was completed on September...

204

Site Transition Process upon Completion of the Cleanup Mission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Process upon Completion of the Cleanup Mission: Fact Sheet (September 2013) Site Transition Process upon Completion of the Cleanup Mission: Fact Sheet (September 2013) DOE's...

205

Idaho Workers Complete Last of Transuranic Waste Transfers Funded...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Workers Complete Last of Transuranic Waste Transfers Funded by Recovery Act Idaho Workers Complete Last of Transuranic Waste Transfers Funded by Recovery Act American Recovery and...

206

NNSA Successfully Completes W87 Refurbishment | National Nuclear...  

NLE Websites -- All DOE Office Websites (Extended Search)

Successfully Completes W87 Refurbishment NNSA announced the successful completion at the Pantex Plant outside of Amarillo, Texas, of efforts to refurbish the W87 nuclear warhead...

207

Recovery Act Workers Complete Environmental Cleanup of Coal Ash...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Workers Complete Environmental Cleanup of Coal Ash Basin Recovery Act Workers Complete Environmental Cleanup of Coal Ash Basin The Savannah River Site (SRS) recently cleaned up a...

208

Oak Ridge Environmental Management Program Completes Work at...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ridge Environmental Management Program Completes Work at Bethel Valley Burial Grounds Oak Ridge Environmental Management Program Completes Work at Bethel Valley Burial Grounds...

209

Digital Materiality: Preserving Access to Computers as Complete Environments  

E-Print Network (OSTI)

J. 1982. Living with a Computer. The Atlantic (July).Preserving Access to Computers as Complete Environmentsthat account for the computer as a complete artifact and

2009-01-01T23:59:59.000Z

210

Los Alamos County Completes Abiquiu Hydropower Project, Bringing...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean Energy Resources to New Mexico Los Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean...

211

Definition of Environmental Management (EM) Completion  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D D D e e f f i i n n i i t t i i o o n n o o f f E E M M C C o o m m p p l l e e t t i i o o n n a a n n d d D D O O E E S S i i t t e e C C l l o o s s u u r r e e This fact sheet defines critical points in the cleanup process, specifies where the Office of Environmental Management (EM) programmatic responsibility ends, and clarifies the responsibilities of other Program Secretarial Offices managing a site after EM's mission is complete. Accordingly, these definitions serve as the framework for developing or revising strategic plans, site baselines, and implementation plans. Environmental Management (Cleanup) includes those activities necessary to evaluate and mitigate a release or threat of release of a hazardous substance that may pose a risk to human health or the environment. Cleanup activities may include source term

212

Status of the MEG Experiment  

Science Conference Proceedings (OSTI)

The MEG experiment which searches for ?? e ? decays at the sensitivity level of 10 ?13 is now in its final stage of the preparation. Some data run is expected by the end of the year 2007. The statuses of each detector components are described.

Aki Maki; MEG Group

2008-01-01T23:59:59.000Z

213

RENEWABLES 2005 GLOBAL STATUS REPORT  

E-Print Network (OSTI)

Research Institute Chinese Renewable Energy Industries Association China Susan McDade Energy EnvironmentRENEWABLES 2005 GLOBAL STATUS REPORT Paper prepared for the REN21 Network by The Worldwatch Institute Lead Author: Eric Martinotwww.ren21.net #12;Renewable Energy Policy Network for the 21st Century

Kammen, Daniel M.

214

-----_ _111 _ _ _ __ HEALTH STATU~S  

E-Print Network (OSTI)

- - - - -_ _111 _ _ _ __ HEALTH STATU~S OF VIETNAM VETER~I~NS SUPPLEMENT A LABORATORY METHOD~3 AND QUALITY CONTROL U.S. DEPARTMENT OF HEALTH AND HUMAN SEIIVICES PUBLIC HEALTH SERVICE Control Vietnam Experience Study January 1989 t t U.S. DEPARTMENT OF HEALTH AND HUMAN SERVICES

215

ESnet Network Measurement Current Status  

E-Print Network (OSTI)

1 ESnet Network Measurement Current Status Joe Metzger Jan 24th 2008 ESCC meeting Energy Sciences ­ Regular scheduled bandwidth testing · Internal to ESnet IP & SDN Network · External to important peers, and ESnet sites that are interested ­ Dynamic end-user testing via · perfSONAR · ESnet Performance Center

216

ESnet Network Measurement Current Status &  

E-Print Network (OSTI)

1 ESnet Network Measurement Current Status & Future Plans Joe Metzger - with slides copied from Networking for the Future of Science #12;2 Overview · ESnet Services ­ New content · LHC Requirements problems and get more systems deployed ­ Regular scheduled bandwidth testing · Internal to ESnet IP & SDN

217

Vacancy Mechanism Davydov I.?.  

National Nuclear Security Administration (NNSA)

9404, P.O. Box 0969, Livermore, CA 94551, USA Summary: Computations of jump activation energy DH j and diffusion jump frequency n have been carried out using the Density Functional...

218

September 2012, Work Force Retention Work Group Status Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Force Retention Work Group Status Overview Work Force Retention Work Group Status Overview 2 Subgroups: Pro-Force and Non-Pro-Force Pro-Force Subgroup: Accomplishments: 1. Completion of 10 CFR 1046 [Protective Force Personnel Medical, Physical Readiness, Training, and Access Authorization Standards] as a final rule that includes modification efforts to address barriers to workforce retention. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce retention in over 20 years. 3. Draft re-charter of PF Career Options Committee (PFCOC) to establish a PF Working Group approved by GC-63 and GC NNSA. Near Term Goals and Activities: 1. Publish 1046 as a final rule - publication anticipated this month.

219

Indian Renewable Energy Status Report: Background Report for DIREC 2010  

NLE Websites -- All DOE Office Websites (Extended Search)

Indian Renewable Energy Status Report Indian Renewable Energy Status Report Background Report for DIREC 2010 D. S. Arora (IRADe) | Sarah Busche (NREL) | Shannon Cowlin (NREL) | Tobias Engelmeier (Bridge to India Pvt. Ltd.) | Hanna Jaritz (IRADe) | Anelia Milbrandt (NREL) | Shannon Wang (REN21 Secretariat) NREL/TP-6A20-48948 October 2010 I R A D e NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately

220

Training Work Group Status Overview - July 2012 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Work Group Status Overview - July 2012 Training Work Group Status Overview - July 2012 Documents Available for Download July 2012 Status Overviews More Documents &...

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Training Work Group Status Overview - July 2012 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 2012 Training Work Group Status Overview - July 2012 Documents Available for Download July 2012 Status Overviews More Documents & Publications Training Work Group Status...

222

Method for enhancement of useful luminescence from vacancy defects in refractory oxides for tunable lasers and the refractory oxides produced thereby  

DOE Patents (OSTI)

Refractory oxide crystals suitable for use in tunable lasers and a method for preparing the same are provided. The crystals are characterized by high quantum efficiency, high thermal stability, good crystal transparency, and a high percentage of useful luminescence. The method for preparation of the crystals involves removing substantially all the hydrogen, thermochemically reducing the crystal's oxygen content to produce oxygen (anion) vacancy defects, and subsequently irradiating the crystal with electrons to inactivate trace H{sup minus} ions so that an increased amount of short lived F{sup +} luminescence is produced when the crystal is optically excited.

Chen, Yok.

1988-09-12T23:59:59.000Z

223

NUCLEAR POWER IN CALIFORNIA: 2007 STATUS REPORT  

E-Print Network (OSTI)

........................................................................................................148 Potential Impact of a Centralized Interim Storage Facility Status and Implications of Centralized Interim Fuel Storage

224

Nuclear lattice simulations: Status and perspectives  

E-Print Network (OSTI)

I review the present status of nuclear lattice simulations. This talk is dedicated to the memory of Gerald E. Brown.

Meiner, Ulf-G

2013-01-01T23:59:59.000Z

225

Weekly Petroleum Status Report Schedule  

Gasoline and Diesel Fuel Update (EIA)

Weekly Petroleum Status Report Weekly Petroleum Status Report Release Schedule The wpsrsummary.pdf, overview.pdf, and Tables 1-14 in CSV and XLS formats, are released to the Web site after 10:30 a.m. (Eastern Time) on Wednesday. All other PDF and HTML files are released to the Web site after 1:00 p.m. (Eastern Time) on Wednesday. Appendix D is produced during the winter heating season, which extends from October through March of each year. For some weeks which include holidays, releases are delayed by one day. Holiday Release Schedule The standard release time and day of the week will be at 10:30 a.m. (Eastern time) on Wednesdays with the following exceptions. All times are Eastern. Data for the week ending Alternate Release Date Release Day Release Time Holiday October 11, 2013 October 21, 2013 Monday 10:30 a.m. Columbus/EIA Closed

226

Final Focus Test Facility ATF2 Status  

Science Conference Proceedings (OSTI)

ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometre level beam stability. Several advanced beam diagnostics and feedback tools are used. In December 2008, construction and installation were completed and beam commissioning started, supported by an international team of Asian, European and American scientists. In this paper, the present status and performance of the recently deployed ATF2 systems are briefly described, based on the first experience with beam measurements and tuning during winter, spring and early autumn of 2009. The near and longer term plans are outlined as well. The ATF collaboration has completed the construction of ATF2 and has started its commissioning. Important experience operating the new cavity BPM and BSM instrumentation in real conditions has been gained and first beam measurements have been performed in a magnetic configuration with reduced optical demagnification. Both horizontal and vertical emittances were successfully tuned and measured in the extraction line, with values approaching the design values of 2 nm and 12 pm, respectively. First checks of the first order optics along the beam line and at the IP were also done. Hardware developments for the second ATF2 goal are being pursued in parallel with the present commissioning work for the first goal. The collaboration is also preparing several near and long terms plans for ATF2. In the next few years, information very valuable for any future collider with local chromaticity correction and tuning of very low emittance beams can be expected. In the previous experience at the FFTB, the smallest vertical beam sizes which were achieved were about 70 nanometers. The work described here continues to address this largely unexplored regime in a systematic way.

Bambade, P.; /KEK, Tsukuba /Orsay, LAL; Seryi, A.; /SLAC; Tauchi, T.; /KEK, Tsukuba

2012-04-06T23:59:59.000Z

227

Renewable Energy Requirement Status: 2005  

Science Conference Proceedings (OSTI)

The potential impacts of renewable portfolio standards (RPS) and other requirements are significant for electricity generation, transmission, and distribution companies, especially for those that depend on coal and other fossil fuels to supply the power delivered to their customers. this Technical Update is to update the information presented in the previous EPRI report, Renewable Energy Requirement Status and Compliance Strategies: 2004 (1008374, December 2004). Although the assessment focuses on state ...

2006-03-30T23:59:59.000Z

228

Gasification Technology Status - December 2011  

Science Conference Proceedings (OSTI)

This report addresses the worldwide market and technology status of gasification technologies. The market for gasification technologies is primarily in China, where national policy has established a major coal-to-chemicals industry and plans to add major coal-to-substitute natural gas and coal-to-liquid transportation fuels in the next five-year plan. Gasification is being deployed to a lesser extent in other Asian countries and elsewhere. Gasification technology companies have responded to this market b...

2011-12-30T23:59:59.000Z

229

Gasification Technology Status -- December 2008  

Science Conference Proceedings (OSTI)

Over the past 5 years, several major power companies have been developing and conducting detailed design studies of commercial-sized coal-based integrated gasification combined-cycle (IGCC) and pulverized coal (PC) projects. Integrated gasification combined-cycle (IGCC) plants can meet very stringent emissions targets, including those for mercury and CO2. This report covers current IGCC designs being offered and reviews the commercial status of gasification technologies, potential improvements, and lesso...

2008-12-18T23:59:59.000Z

230

Gasification Technology Status - December 2012  

Science Conference Proceedings (OSTI)

This report addresses the worldwide market and technology status of gasification technologies. The market for gasification technologies is primarily in China, where national policy has established a major coal-to-chemicals industry and plans to add major coaltosubstitute natural gas and coaltoliquid transportation fuels in the next five-year plan. Gasification is being deployed to a lesser extent in other Asian countries and elsewhere. Gasification technology companies ...

2012-12-31T23:59:59.000Z

231

Gasification Technology Status - December 2010  

Science Conference Proceedings (OSTI)

Several Integrated Gasification Combined Cycle (IGCC) projects that incorporate various degrees of CO2 Capture and Sequestration (CCS) are under development worldwide. This report covers current IGCC designs on offer that include CO2 capture and reviews the commercial status of gasification technologies, potential improvements, and lessons learned from commercial operating experience at IGCC plants. It describes and evaluates the considerable R&D program of the U.S. DOE and industrial companies to improv...

2010-12-31T23:59:59.000Z

232

United States National Hydrogen Fuel Cell Vehicle and Infrastructure Learning Demonstration - Status and Results (Presentation)  

DOE Green Energy (OSTI)

This presentation provides status and results for the United States National Hydrogen Fuel Cell Vehicle Learning Demonstration, including project objectives, partners, the National Renewable Energy Laboratory's role in the project and methodology, how to access complete results, and results of vehicle and infrastructure analysis.

Wipke,K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Garbak, J.

2009-03-06T23:59:59.000Z

233

Joint Maintenance Status Report of Potomac Electric Power Company amd PJM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Maintenance Status Report of Potomac Electric Power Company Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Docket No. EO-05-01: Potomac Electric Power Company ("Pepco") and PJM Interconnection, L.L.C. ("PJM") hereby jointly submit this Maintenance Report to advise you of the work completed and findings made during the maintenance outages for Pepco's two 230 kV circuits from the Palmers Comer to Potomac River substations pursuant to the December 20. 2006, Department of Energy ("DOE") Order No. 202-05-3. Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC More Documents & Publications Special Environmental Analysis For Actions Taken under U.S. Department of

234

Development Status of The ILC Marx Modulator  

SciTech Connect

The ILC Marx Modulator is under development as a lower cost alternative to the 'Baseline Conceptual Design' (BCD) klystron modulator. Construction of a prototype Marx is complete and testing is underway at SLAC. The Marx employs solid state elements, IGBTs and diodes, to control the charge, discharge and isolation of the modules. The prototype is based on a stack of sixteen modules, each initially charged to {approx}11 kV, which are arranged in a Marx topology. Initially, eleven modules combine to produce the 120 kV output pulse. The remaining modules are switched in after appropriate delays to compensate for the voltage droop that results from the discharge of the energy storage capacitors. Additional elements will further regulate the output voltage to {+-}0.5%. The Marx presents several advantages over the conventional klystron modulator designs. It is physically smaller; there is no pulse transformer (quite massive at these parameters) and the energy storage capacitor bank is quite small, owing to the active droop compensation. It is oil-free; voltage hold-off is achieved using air insulation. It is air cooled; the secondary air-water heat exchanger is physically isolated from the electronic components. This paper outlines the current developmental status of the prototype Marx. It presents a detailed electrical and mechanical description of the modulator and operational test results. It will discuss electrical efficiency measurements, fault testing, and output voltage regulation.

Nguyen, M; Beukers, T.; Burkhart, C.; Larsen, R.; Olsen, J.; Tang, T.; /SLAC

2010-06-07T23:59:59.000Z

235

Development Status of the ILC Marx Modulator  

DOE Green Energy (OSTI)

The ILC Marx Modulator is under development as a lower cost alternative to the 'Baseline Conceptual Design' (BCD) klystron modulator. Construction of a prototype Marx is complete and testing is underway at SLAC. The Marx employs solid state elements, IGBTs and diodes, to control the charge, discharge and isolation of the modules. The prototype is based on a stack of sixteen modules, each initially charged to {approx}11 kV, which are arranged in a Marx topology. Initially, eleven modules combine to produce the 120 kV output pulse. The remaining modules are switched in after appropriate delays to compensate for the voltage droop that results from the discharge of the energy storage capacitors. Additional elements will further regulate the output voltage to {+-} 0.5%. The Marx presents several advantages over the conventional klystron modulator designs. It is physically smaller; there is no pulse transformer (quite massive at these parameters) and the energy storage capacitor bank is quite small, owing to the active droop compensation. It is oil-free; voltage hold-off is achieved using air insulation. It is air cooled; the secondary air-water heat exchanger is physically isolated from the electronic components. This paper outlines the current developmental status of the prototype Marx. It presents a detailed electrical and mechanical description of the modulator and operational test results. It will discuss electrical efficiency measurements, fault testing, and output voltage regulation.

Nguyen, M.; Beukers, T.; Burkhart, C.; Larsen, R.; Olsen, J.; Tang, T.; /SLAC

2008-06-16T23:59:59.000Z

236

Microsoft PowerPoint - eLens status Anerella 083011.pptx  

NLE Websites -- All DOE Office Websites (Extended Search)

August 30 2011 August 30 2011 August 30, 2011 1 E-Lens - General * G 10 wiring board delivered; to be assembled by RM * G-10 wiring board delivered; to be assembled by RM (after jury duty) (SP) * All parts for vertical cold test assembly submitted to CS (SP) to CS (SP) * Cold mass, cryostat drawing work continues (LR/SP/PK!) Yoke material due 8/29 * Yoke material - due 8/29 * Coil support installation fixture - base plate by tomorrow C t tti fi t M d b itt d PK * Cryostatting fixture Mods submitted - PK * Coil status - following slides 2 Corrector coils * 1 st Corrector: * Final cure complete * Final cure complete * Electrical tests underway (hypot complete) * 2 nd Corrector: * (8) 0.5 m coils complete (DM) 3 Main Solenoid Coils * 1 st main solenoid * Machining complete * Electrical tests complete * Waiting for stainless steel support W

237

Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Department of Energy Identity, Credential, and Access Management (ICAM) Cyber Security Training Conference Tuesday, May 18, 2010 Office of the Chief Information Officer 2 Announcement * LACS Birds-of-a-Feather Session - Logistics * Wednesday, May 19, 2010 * 9:30 AM - 11:30 AM EST * Room A708 - Focus: LACS ONLY! * LACS implementation experiences, lessons, questions, challenges, etc - Everyone is welcome * Science Identity Federation (Risk Management Track) - Logistics * Tuesday, May 18, 2010 * 4:00 PM - 5:00 PM EST * Room A704 - Focus * Ties into NSF/NIH InCommon Federation * Federated identity solution for Level 1 authentication Office of the Chief Information Officer 3 Slight Change of Focus Credential Issuance Facility Office of the Chief Information Officer 4 Paradigm Shift

238

STATUS:  

E-Print Network (OSTI)

Thank you for your submittal of the Total Maximum Daily Load (TMDL) documents that address biological impairments in Moon, Stevens, and Rugg Brooks. These waterbodies are included on Vermonts 2008 303(d) list and were prioritized for TMDL development. The purpose of these TMDLs is to address aquatic life use impairments caused by stormwater runoff. The U.S. Environmental Protection Agency (EPA) hereby approves Vermonts October, 2008 versions of the three TMDLs (for Moon, Stevens, and Rugg Brooks) submitted with a cover letter dated October 2, 2008. EPA has determined that these TMDLs meet the requirements of 303(d) of the Clean Water Act (CWA), and of EPAs implementing regulations (40 CFR Part 130). A copy of our approval documentation is enclosed. Thank you again for your submittal. My staff and I look forward to continued cooperation with VTDEC in exercising our shared responsibility of implementing the requirements under Section 303(d) of the CWA. Sincerely, /s/

Laura Pelosi Commissioner; Rugg Brook Tmdls; Ken Moraff; Acting Director

2009-01-01T23:59:59.000Z

239

Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(ICAM) will improve the security and interoperability of the Nuclear Security Enterprise (NSE)" * Cyber Security Governance Council Representatives - ICAM Governance model...

240

Status  

NLE Websites -- All DOE Office Websites (Extended Search)

030310 002 030210 030210 Direct Requesting copies of Consultation and cooperative Agreement between the Department of Energy and the State of New Mexico with the...

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

[ital K]-[ital K]-electron transfer and [ital K]-shell-vacancy production cross sections for Ti bombarded by [sup 28]Si and [sup 32]S beams at 1. 25--4. 70 MeV/amu  

SciTech Connect

Single and double [ital K]-[ital K]-electron transfer and the [ital K]-shell-vacancy production cross sections for Ti bombarded by [sup 28]Si and [sup 32]S beams at energies varying between 1.25 and 4.7 MeV/amu have been determined, in the limit of zero target thickness, from the thickness variation of the Ti [ital K] x-ray yield with ion beams having 0, 1, or 2 vacancies in their [ital K] shell. From the measured energy shift and the intensity ratios of [ital K][alpha], [ital K][beta] lines, the average number of 2[ital p] and 3[ital p] vacancies were determined from which the average value of the fluorescence yield [omega][sub [ital K

Tribedi, L.C.; Prasad, K.G.; Tandon, P.N. (Tata Institute of Fundamental Research, Bombay 400 005 (India))

1993-05-01T23:59:59.000Z

242

Definition of Environmental Management (EM) Completion | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Definition of Environmental Management (EM) Completion Definition of Environmental Management (EM) Completion Definition of Environmental Management (EM) Completion The purpose of this memorandum is to provide you with additional clarification on: 1) the specific activities that must be accomplished before an environmental cleanup project is complete; and 2) the specific activities that need to be accomplished before the Office of Environmental Management's (EM) responsibility for a site, or portions of a site, is complete. Definition of Environmental Management (EM) Completion More Documents & Publications EM SSAB Conference Calls - January 27, 2011 Site Transition Summary: Cleanup Completion to Long-Term Stewardship at Department of Energy On-going Mission Sites Site Transition Process upon Completion of the Cleanup Mission: Fact Sheet

243

"TRU" Success: SRS Recovery Act Prepares to Complete Shipment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Act Prepares to Complete Shipment of More Than 5,000 Cubic Meters of Nuclear Waste to WIPP "TRU" Success: SRS Recovery Act Prepares to Complete Shipment of More Than 5,000 Cubic...

244

Idaho Cleanup Project completes work at Test Area North complex...  

NLE Websites -- All DOE Office Websites (Extended Search)

Idaho Cleanup Project completes work at Test Area North complex at DOEs Idaho site Loss-Of-Fluid Test Reactor Facility (before) Idaho Cleanup Project workers have completed all...

245

Apparatus for the concurrent inspection of partially completed welds  

DOE Patents (OSTI)

An apparatus for the concurrent inspection of partially completed welds is described in which is utilized in combination with a moveable welder for forming a partially completed weld, and an ultrasonic generator mounted on a moveable welder in which is reciprocally moveable along a path of travel which is laterally disposed relative to the partially completed weld.

Smartt, Herschel B. (Idaho Falls, ID); Johnson, John A. (Idaho Falls, ID); Larsen, Eric D. (Idaho Falls, ID); Bitsoi, Rodney J. (Ririe, ID); Perrenoud, Ben C. (Rigby, ID); Miller, Karen S. (Idaho Falls, ID); Pace, David P. (Idaho Falls, ID)

2002-01-01T23:59:59.000Z

246

DOE Workshop - Deposition Velocity Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Delivering DOE's Vision for the Delivering DOE's Vision for the East Tennessee Technology Park Mission Safely Delivering the Department of Energy's Vision for the East Tennessee Technology Park Mission DOE Workshop Deposition Velocity Status Mike Hitchler, Manager Nuclear Facility Safety June 5, 2012 Safely Delivering DOE's Vision for the East Tennessee Technology Park Mission Existing UCOR Analyses * UCOR facilities at East Tennessee Technology Park (ETTP) and Oak Ridge National Laboratory (ORNL) use various plume models depending on when they were developed and by whom. - Some use MACCS or MACCS2 for dispersion evaluation. (~5 locations) - LLLW uses ingestion modeling (multiple locations)

247

Status of the LNG industry  

Science Conference Proceedings (OSTI)

A status report on the liquefied natural gas (LNG) industry after 22 years of international trade compares developments during 1984-1985 for the major exporting and importing countries. Japan, the leading consumer, imports over 72% of the world production, while Europe imports 27% and the US 1%. There are 10 baseload liquefaction plants with a collective capacity of about 230 million m/sup 3//streamday. Japan has 85% of the world's LNG storage facilities because its geology is not suitable for underground storage. Utilities are looking to LNG for peakshaving, but it will be necessary to time projects so that production and demand will develop a reliable trade climate. 3 tables.

Anderson, P.J.

1986-06-30T23:59:59.000Z

248

State building energy codes status  

Science Conference Proceedings (OSTI)

This document contains the State Building Energy Codes Status prepared by Pacific Northwest National Laboratory for the U.S. Department of Energy under Contract DE-AC06-76RL01830 and dated September 1996. The U.S. Department of Energy`s Office of Codes and Standards has developed this document to provide an information resource for individuals interested in energy efficiency of buildings and the relevant building energy codes in each state and U.S. territory. This is considered to be an evolving document and will be updated twice a year. In addition, special state updates will be issued as warranted.

NONE

1996-09-01T23:59:59.000Z

249

Status of Charm Flavor Physics  

E-Print Network (OSTI)

The role of charm in testing the Standard Model description of quark mixing and CP violation through measurements of lifetimes, decay constants and semileptonic form factors is reviewed. Together with Lattice QCD, charm has the potential this decade to maximize the sensitivity of the entire flavor physics program to new physics. and pave the way for understanding physics beyond the Standard Model at the LHC in the coming decade. The status of indirect searches for physics beyond the Standard Model through charm mixing, CP-violation and rare decays is also reported.

I. Shipsey

2006-07-26T23:59:59.000Z

250

Relativistic Positioning Systems: current status  

E-Print Network (OSTI)

A {\\em relativistic positioning system} consists in a set of four clocks broadcasting their respective proper time by means of light signals. Among them, the more important ones are the {\\em auto-located positioning systems,} in which every clock broadcasts not only its proper time but also the proper times that it receives from the other three. At this level, no reference to any exterior system (the Earth surface, for example) and no synchronization are needed. The current status of the theory of relativistic positioning systems is sketched.

Bartolom Coll; Joan J. Ferrando; Juan A. Morales-Lladosa

2009-06-03T23:59:59.000Z

251

Foreign Obligations Implementation Status Presentation  

National Nuclear Security Administration (NNSA)

January 13, 2004 Crowne Plaza Ravinia Atlanta, January 13, 2004 Crowne Plaza Ravinia Atlanta, January 13, 2004 Crowne Plaza Ravinia Atlanta, Georgia Georgia Obligations Accounting Implementation Workshop Obligations Accounting Implementation Workshop Foreign Obligations Implementation Status Brian G. Horn U.S. Nuclear Regulatory Commission January 13, 2004 Obligations Accounting Implementation Workshop January 13, 2 Obligations Accounting Implementation Workshop January 13, 2004 Crowne Plaza Ravinia Atlanta, GA 004 Crowne Plaza Ravinia Atlanta, GA Overview of Meeting Overview of Meeting * Review how the Obligation Tracking System is working * Presentations: - Review of Government notification procedures - Establishment of the beginning Obligation Balances for sites

252

Contractor Earned Value Management System Certification Status...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Centers Field Sites Power Marketing Administration Other Agencies You are here Home Contractor Earned Value Management System Certification Status Contractor Earned...

253

Estimating IPv6 & DNSSEC Deployment Status  

Science Conference Proceedings (OSTI)

Estimating IPv6 & DNSSEC External Service Deployment Status Background and Methodology. ... gov.two. Agency Two, (errors & islands). gov.three. ...

2013-11-07T23:59:59.000Z

254

Idle Reduction Technology Demonstrations: Status Report  

Science Conference Proceedings (OSTI)

DOE's Advanced Vehicle Testing Activity is sponsoring 3 idle reduction demonstration projects for heavy-duty trucks. This report provides the status of the projects.

Proc, K.

2004-11-01T23:59:59.000Z

255

Weekly Petroleum Status Report - Energy Information Administration  

U.S. Energy Information Administration (EIA)

DOE/EIA-0208(2012-104) Distribution Category UC-98 Data for Week Ended: December 28, 2012 Weekly Petroleum Status Report

256

Weekly Petroleum Status Report - Energy Information Administration  

U.S. Energy Information Administration (EIA)

DOE/EIA-0208(2013-17) Distribution Category UC-98 Data for Week Ended: April 26, 2013 Weekly Petroleum Status Report

257

Status & Direction for Onboard Hydrogen Storage  

NLE Websites -- All DOE Office Websites (Extended Search)

Economy Manufacturing for the Hydrogen Economy Status & Direction for Onboard Hydrogen Storage Andy Abele Quantum Fuel Systems Technologies Worldwide, Inc. July 2005 This...

258

Status of SAE Electro-Mobility Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

US-China Electric Vehicle and Battery Technology Workshop -Boston, MA Status of SAE Electro-Mobility Standards Peter Byk Technical Project Manager, Global Ground Vehicle Standards...

259

Status of State Electric Industry Restructuring Activity  

Reports and Publications (EIA)

Presents an overview of the status of electric industry restructuring in each state.. Restructuring means that a monopoly system of electric utilities has been replaced with competing sellers.

Channele Wirman

2010-09-01T23:59:59.000Z

260

Habitat Projects Completed within the Asotin Creek Watershed, 1998 Completion Report.  

DOE Green Energy (OSTI)

The Asotin Creek Model Watershed Program (ACMWP) is the primary entity coordinating habitat projects on both private and public lands within the Asotin Creek watershed. The Asotin Creek watershed covers approximately 325 square miles in the Blue Mountains of southeastern Washington. Snake River spring chinook salmon, summer steelhead and bull trout, which are listed under the Endangered Species Act (ESA), are present in the watershed. The ACMWP began coordinating habitat projects in 1995. Approximately two hundred forty-six projects have been implemented through the ACMWP as of 1998. Fifty-nine of these projects were funded in part through Bonneville Power Administration's 1998 Columbia Basin Fish and Wildlife Program. These projects used a variety of methods to enhance and protect watershed conditions. In-stream work for fish habitat included construction of hard structures (e.g. vortex rock weirs), meander reconstruction, placement of large woody debris (LWD) and whole trees and improvements to off-channel rearing habitat; one hundred thirty-nine pools were created with these structures. Three miles of stream benefited from riparian improvements such as fencing, vegetative plantings, and noxious weed control. Two alternative water developments were completed, providing off-stream-watering sources for livestock. 20,500 ft of upland terrace construction, seven sediment basin construction, one hundred eighty-seven acres of grass seeding, eight hundred fifty acres of direct seeding and eighteen sediment basin cleanouts were implemented to reduce sediment production and delivery to streams in the watershed.

Johnson, Bradley J.

1999-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

FINANCIAL STATUS REPORT (Short Form)  

E-Print Network (OSTI)

instructions, searching existing data sources, gathering and maintaining the data needed, and completing's grant regulations or in the terms and conditions of the award. You may also contact the Federal agency directly. Item Entry Item Entry 1, 4. 5. 6. 7. 8. 9. 10. 10a. 2 and 3. Self-explanatory. Enter the Employer

Bandettini, Peter A.

262

Vacancy related defects in La{sub 0.5}Sr{sub 0.5}CoO{sub 3-{delta}} thin films  

Science Conference Proceedings (OSTI)

Laser ablated La{sub 0.5}Sr{sub 0.5}CoO{sub 3-{delta}} thin films have been studied by Doppler-broadening-detected positron annihilation using a variable-energy positron beam. The oxygen partial pressure during cooling from the growth temperature was altered through the range 760 torr to 10{sup -5} torr to change the oxygen non-stoichiometry of the films. The measured Doppler broadened lineshape parameter S was found to increase with increasing oxygen nonstoichiometry. For films cooled with an oxygen partial pressure of {le} 10{sup -4} Torr positron trapping to monovacancy type defects is inferred. For the film cooled in 10{sup -5} torr oxygen the magnitude of the increase in S, with respect to that measured from the film cooled in 760 Torr oxygen, showed positron trapping to vacancy cluster defects was occurring.

Keeble, D.J. [Univ. of Dundee (United Kingdom). Carnegie Lab. of Physics; Krishnan, A. [Michigan Technological Univ., Houghton, MI (United States). Dept. of Physics; Nielsen, B. [Brookhaven National Lab., Upton, NY (United States)] [and others

1996-12-31T23:59:59.000Z

263

Electron spin resonance shift and linewidth broadening of nitrogen-vacancy centers in diamond as a function of electron irradiation dose  

SciTech Connect

A high-nitrogen-concentration diamond sample was subjected to 200-keV electron irradiation using a transmission electron microscope. The optical and spin-resonance properties of the nitrogen-vacancy (NV) color centers were investigated as a function of the irradiation dose up to 6.4 Multiplication-Sign 10{sup 21} e{sup -}/cm{sup 2}. The microwave transition frequency of the NV{sup -} center was found to shift by up to 0.6% (17.1 MHz) and the linewidth broadened with increasing electron-irradiation dose. Unexpectedly, the measured magnetic sensitivity is best at the lowest irradiation dose, even though the NV concentration increases monotonically with increasing dose. This is in large part due to a sharp reduction in optically detected spin contrast at higher doses.

Kim, Edwin [Ramtron International Corporation, 1850 Ramtron Drive, Colorado Springs, Colorado 80921 (United States); Acosta, Victor M. [Hewlett-Packard Laboratories, 1501 Page Mill Road, Palo Alto, California 94304 (United States); Department of Physics, University of California, Berkeley, California 94720-7300 (United States); Bauch, Erik [Department of Physics, University of California, Berkeley, California 94720-7300 (United States); Technische Universitaet Berlin, Hardenbergstrasse 28, 10623 Berlin (Germany); Budker, Dmitry [Department of Physics, University of California, Berkeley, California 94720-7300 (United States); Nuclear Science Division, Lawrence Berkeley National Laboratory, Berkeley, California 94720 (United States); Hemmer, Philip R. [Department of Electrical and Computer Engineering, Texas A and M University, College Station, Texas 77843-3128 (United States)

2012-08-20T23:59:59.000Z

264

Application of Vacancy Injection Gettering to Improve Efficiency of Solar Cells Produced by Millinet Solar: Cooperative Research and Development Final Report, CRADA Number CRD-10-417  

SciTech Connect

NREL will apply vacancy injection gettering (VIG) to Millinet solar cells and evaluate the performance improvement produced by this process step. The VIG will be done in conjunction with the formation of a back, Al-alloyed, contact. Millinet Solar will provide NREL with cells having AR coating on the front side and screen-printed Al on the backside, which will be processed in the NREL's optical furnace to perform simultaneous VIG and back contact alloying with deep BSF. These cells will be sent back to Millinet solar for a screen-printed front/side contact mask, followed by a second firing at NREL. Detailed analyses will be performed to determine improvements due to BSF and VIG.

Sopori, B.

2012-07-01T23:59:59.000Z

265

PHMC Year 2000: Status reporting for mission essential Year 2000 projects. Revision 0, Volume 3  

SciTech Connect

The PHMC Year 2000 status reporting process is designed to encompass the reporting requirements of the Office of Management and Budget (OMB), DOE HQ, RL and the PHMC for mission essential Year 2000 projects. Status reporting is required for all Year 2000 projects. The Year 2000 project list will be maintained current as Year 2000 projects are modified, added or deleted. Reporting is required until a Year 2000 project has completed compliance assurance. Some projects will be identified as DOE HQ reportable. These are projects determined to be the most critical and due the attention of DOE HQ.

Layfield, K.A.

1998-09-02T23:59:59.000Z

266

SRS Recovery Act Completes Major Lower Three Runs Project Cleanup |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SRS Recovery Act Completes Major Lower Three Runs Project Cleanup SRS Recovery Act Completes Major Lower Three Runs Project Cleanup SRS Recovery Act Completes Major Lower Three Runs Project Cleanup American Recovery and Reinvestment Act can now claim that 85 percent of the Savannah River Site (SRS) has been cleaned up with the recent completion of the Lower Three Runs (stream) Project. Twenty miles long, Lower Three Runs leaves the main body of the 310-square mile site and runs through parts of Barnwell and Allendale Counties until it flows into the Savannah River. Government property on both sides of the stream acts as a buffer as it runs through privately-owned property. Completing this project reduces the site's footprint by another 10 percent. SRS Recovery Act Completes Major Lower Three Runs Project Cleanup More Documents & Publications

267

Los Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Alamos County Completes Abiquiu Hydropower Project, Bringing Los Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean Energy Resources to New Mexico Los Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean Energy Resources to New Mexico April 21, 2011 - 12:00am Addthis WASHINGTON, D.C. - U.S. Energy Secretary Steven Chu issued the following statement on the completion and startup today of the Abiquiu Hydropower Project in New Mexico - the first hydropower project funded by the American Recovery and Reinvestment Act to be completed nationwide. "Today marks a major milestone in securing America's clean energy future as we celebrate the completion of the Department of Energy's first major Recovery Act-funded water power project. By increasing renewable energy output at existing hydropower facilities, we can create clean energy jobs,

268

SRS Recovery Act Completes Major Lower Three Runs Project Cleanup |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SRS Recovery Act Completes Major Lower Three Runs Project Cleanup SRS Recovery Act Completes Major Lower Three Runs Project Cleanup SRS Recovery Act Completes Major Lower Three Runs Project Cleanup American Recovery and Reinvestment Act can now claim that 85 percent of the Savannah River Site (SRS) has been cleaned up with the recent completion of the Lower Three Runs (stream) Project. Twenty miles long, Lower Three Runs leaves the main body of the 310-square mile site and runs through parts of Barnwell and Allendale Counties until it flows into the Savannah River. Government property on both sides of the stream acts as a buffer as it runs through privately-owned property. Completing this project reduces the site's footprint by another 10 percent. SRS Recovery Act Completes Major Lower Three Runs Project Cleanup More Documents & Publications

269

Method for the concurrent ultrasonic inspection of partially completed welds  

DOE Patents (OSTI)

A method for the concurrent ultrasonic inspection of partially completed welds is disclosed and which includes providing a pair of transducers which are individually positioned on the opposite sides of a partially completed weld to be inspected; moving the transducers along the length of and laterally inwardly and outwardly relative to the partially completed weld; pulsing the respective transducers to produce an ultrasonic signal which passes through or is reflected from the partially completed weld; receiving from the respective transducers ultrasonic signals which pass through or are reflected from the partially completed welds; and analyzing the ultrasonic signal which has passed through or is reflected from the partially completed weld to determine the presence of any weld defects.

Johnson, John A. (Idaho Falls, ID); Larsen, Eric D. (Idaho Falls, ID); Miller, Karen S. (Idaho Falls, ID); Smartt, Herschel B. (Idaho Falls, ID); McJunkin, Timothy R. (Idaho Falls, ID)

2002-01-01T23:59:59.000Z

270

Energy Department Completes K-25 Gaseous Diffusion Building Demolition |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department Completes K-25 Gaseous Diffusion Building Energy Department Completes K-25 Gaseous Diffusion Building Demolition Energy Department Completes K-25 Gaseous Diffusion Building Demolition December 19, 2013 - 12:00pm Addthis K-25 Demolition - Oak Ridge 2013 K-25 Demolition - Oak Ridge 2013 Media Contacts Ben Williams, DOE, (865) 574-4912 Wayne McKinney, UCOR, (865) 576-6284 Oak Ridge, Tenn. - Today, the Department of Energy announced that its contractor URS|CH2M Oak Ridge, LLC, or UCOR, has completed demolition of the K-25 gaseous diffusion building, the largest facility in the DOE complex. UCOR took over the project in 2011 and has maintained a strong safety record while completing the demolition over one year ahead of its current schedule and approximately $300 million under the current budget. All debris removal is expected to be completed in spring 2014.

271

Microsoft PowerPoint - eLens status Anerella 101111.pptx  

NLE Websites -- All DOE Office Websites (Extended Search)

October 11 2011 October 11 2011 October 11, 2011 1 E-Lens - General * All parts for vertical cold test assembly in process in CS, expected delivery 10/28 (SP) C ld t t d i k ti * Cold mass, cryostat drawing work continues (LR/SP/PK/SS) * Yoke material - received, in CS for machining f d P * Cryostatting fixture Mods in CS - PK * Vertical cold test top hat, hanging support design complete, released to CS * Magnetic Needle Tooling - all parts in CS, some parts complete, expected delivery ~ 10/30 (PK) * Coil status - following slides g 2 Corrector coils * 1 st Corrector: * Electrical tests complete * Electrical tests complete * Needs helium holes in FG * 2 nd Corrector: * (20) 0.5 m coil electrical tests complete (JE) * (4) 2.5 m coils wound (DM) 3 Main Solenoid Coils 1 st main solenoid * All stainless steel support sleeve

272

Mobil completes deep, tight, horizontal gas well in Germany  

Science Conference Proceedings (OSTI)

A completion and fracturing program for stimulating a horizontal well in the ultra-tight Rotliegendes sand onshore Germany included casing design, completion fluid selection, overbalanced perforation, analysis of the stimulation treatment, design modification, zone and fracture isolation, well testing and acid stimulation. This paper reviews the field geology, the well design, casing design, describes the completion fluids, perforation techniques, fracture treatment, and methods for zone isolation.

Abou-Sayed, I.S.; Chambers, M.R. [Mobil E and P Technical Center, Dallas, TX (United States); Mueller, M.W. [Mobil Erdgas-Erdoel GmbH, Celle (Germany)

1996-08-01T23:59:59.000Z

273

TECHNICAL PROGRESS REPORT FOR UTSI/CFFF MHD PROGRAM COMPLETION AND RELATED ACTIVITIES  

DOE Green Energy (OSTI)

Routine preventive maintenance of the DOE Coal Fired Flow Facility (CFFF) is being performed. Modernization programs, funded under subcontract from Foster Wheeler Development Corporation by the DOE HIPPS Program, have been completed on the coal processing system, the data acquisition and control system and the control room. Late in the quarter, all work was stopped on maintenance of the CFFF at DOE instruction. Environmental restoration actions continued with monitoring of groundwater wells and holding pond effluent. Progress is reported on the approved groundwater remediation plan. Actions are underway to dispose of spent seed/ash mixtures and excess coal remaining from the MHD POC program. The status of five (5) High Temperature Superconductor (HTS) projects is reported. A summary is included of the results attained with sol-gel experiments with buffer layers and YBCO. The status of the cost/performance study of electron beam and PLD deposition is pre-sented. A summary of work performed in diagnostics for real time control of HTS processes is presented.

DR. JAMES N. CHAPMAN; DR. JOEL W. MUEHLHAUSER

1998-10-23T23:59:59.000Z

274

NNSA and Kazakhstan Complete Operation to Eliminate Highly Enriched...  

NLE Websites -- All DOE Office Websites (Extended Search)

Flickr RSS Twitter YouTube NNSA and Kazakhstan Complete Operation to Eliminate Highly Enriched Uranium | National Nuclear Security Administration Our Mission Managing the Stockpile...

275

Martin-Lf Random and PA-complete Sets  

E-Print Network (OSTI)

A set A is Martin-Lof random iff the class fAg does not have \\Sigma 1 -measure 0. A set A is PA-complete if one can compute relative to A a consistent and complete extension of Peano Arithmetic. It is shown that every Martin-Lof random set either permits to solve the halting problem K or is not PA-complete. This result implies a negative answer to the question of Ambos-Spies and Kucera whether there is a Martin-Lof random set not above K which is also PA-complete.

Frank Stephan

2002-01-01T23:59:59.000Z

276

Major Milestone: PPPL completes first quadrant of the heart of...  

NLE Websites -- All DOE Office Websites (Extended Search)

Major Milestone: PPPL completes first quadrant of the heart of the National Spherical Torus Experiment Upgrade By John Greenwald March 18, 2013 Tweet Widget Facebook Like Google...

277

Pantex High Pressure Fire Loop Project Completed On Time, Under...  

National Nuclear Security Administration (NNSA)

the approved cost and schedule baselines. In 2013, NNSA completed five projects on time, including HPFL, and collectively more than 10 million under budget. NNSA has been...

278

Department of Energy Completes Demolition of K-33 Building -...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

its largest demolition project to date. The removal of K-33, a former gaseous diffusion uranium enrichment facility spanning 32-acres, was completed several months ahead of...

279

Joint Spectral Radius and Path-Complete Graph Lyapunov Functions  

E-Print Network (OSTI)

Nov 22, 2011 ... Abstract: We introduce the framework of path-complete graph Lyapunov functions for approximation of the joint spectral radius. The approach is...

280

How to Fill Out a Well Completion Report Instruction Pamphlet  

E-Print Network (OSTI)

For assistance in preparing the Well Completion Report form, contact the nearest Department of Water Resources District Office according to the county in which the well is located (see below). Well Completion Report forms which do not have sufficient well location information will be returned to the sender and considered incomplete until the required information is received. Send completed Well Completion Report forms to the appropriate District Office listed below. To request copies of this instruction pamphlet contact DWRs Publications and Paperwork Management Office at (916) 653-1097 or

El Dorado; North Mono

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Energy Department Completes Salt Coolant Material Transfer to...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Republic's Ministry of Industry and Trade to complete the transfer of 75 kilograms of fluoride salt from the Department's Oak Ridge National Laboratory (ORNL) to the Czech Nuclear...

282

State Energy Data System (SEDS) Complete Dataset through 2009...  

Open Energy Info (EERE)

Complete Dataset through 2009 The State Energy Data System (SEDS) is compiled by the U.S. Energy Information Administration's (EIA); it is a comprehensive database of energy...

283

Tyre parameter identification from road tests on a complete vehicle.  

E-Print Network (OSTI)

??Vehicle manufacturers notice a difference between the tyre behaviour observed in road tests with a complete vehicle and the behaviour of the tyre as provided (more)

Lo Conte, D.

2010-01-01T23:59:59.000Z

284

Complete genome sequence of Acidimicrobium ferrooxidans type strain (ICPT)  

E-Print Network (OSTI)

with type strain genome sequencing projects registered inResearch, Braunschweig) Genome sequencing and annotationthe complete Table 2. Genome sequencing project information

Clum, Alicia

2010-01-01T23:59:59.000Z

285

COSO Geothermal Exploratory Hole No. 1, CGEH No. 1. Completion...  

Open Energy Info (EERE)

COSO Geothermal Exploratory Hole No. 1, CGEH No. 1. Completion report. (Coso Hot Springs KGRA) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: COSO Geothermal...

286

DOE completes environmental assessment on INL National Security...  

NLE Websites -- All DOE Office Websites (Extended Search)

icon Printer-Friendly April 17, 2007 DOE completes environmental assessment on INL National Security Test Range The U.S. Department of Energy has issued the final...

287

Molecular Biosciences Trainee Progress Report (To Be Completed by Student)  

E-Print Network (OSTI)

Molecular Biosciences Trainee Progress Report (To Be Completed by Student) Trainee name: Ph. #12;Molecular Biosciences Trainee Progress Advisory Committee Report Trainee: Major Advisor: MBTG

Sheridan, Jennifer

288

Pages that link to "China National Machinery Industry Complete...  

Open Energy Info (EERE)

en.openei.orgwikiSpecial:WhatLinksHereChinaNationalMachineryIndustryCompleteEngineeringCorporationCMCEC" Special pages About us Disclaimers Energy blogs Developer...

289

Omega Laser Facility Completes Record 25,000 Experiments | National...  

National Nuclear Security Administration (NNSA)

NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Press Releases > Omega Laser Facility Completes Record 25,000...

290

Deputy Administrator Anne Harrington on Completion of BN-350...  

NLE Websites -- All DOE Office Websites (Extended Search)

Anne Harrington on Completion of BN-350 Fuel Shipments | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering...

291

EIA Completes Corrections to Drilling Activity Estimates Series  

Reports and Publications (EIA)

The Energy Information Administration (EIA) has published monthly and annual estimates of oil and gas drilling activity since 1978. These data are key information for many industry analysts, serving as aleading indicator of trends in the industry and a barometer of general industry status.

Information Center

1999-01-01T23:59:59.000Z

292

Status of current IPH applications  

SciTech Connect

The US Department of Energy has funded a series of field tests since 1977 to gain operational experience in the application of solar energy to industrial process heat requirements. To date, 34 design studies or actual installations have been funded utilizing technologies ranging from flat plates to line-focus concentrators to central receiver industrial systems. The types of solar systems include hot air, hot water, and steam production applied to a broad spectrum of industrial processes. The program elements are identified and put in perspective relative to transport fluid, temperature level, and size of the solar field. The status of these programs ranges from design studies to operational systems. Solar enhanced oil recovery and repowering have been studied. The chronological history of each program is tabulated. (LEW)

Kearney, D. W.

1981-03-01T23:59:59.000Z

293

ATLAS Status and latest results  

E-Print Network (OSTI)

The ATLAS experiment is a general-purpose detector located in one of the four interaction points of the Large Hadron Collider at CERN, Switzerland. In 2010 LHC has been colliding proton beams at the unprecedented centre-of-mass energy of 7 TeV. The last month of operation was dedicated to Pb-ion collisions at centre-of-mass energy of 2.76 TeV per nucleon. In this talk, a survey of the status of the ATLAS detector in both runs will be presented. The main results in pp collisions, including the study of minimum bias events, jets, W/Z, top and first searches for new physics will be reviewed. First results from heavy Ion collisions will be focussed on charged particle multiplicity, transverse energy, and elliptic flow as a function of collision geometry.

Sbarra, C; The ATLAS collaboration

2011-01-01T23:59:59.000Z

294

Power, Status, and Learning in Organizations  

Science Conference Proceedings (OSTI)

This paper reviews the scholarly literature on the effects of social hierarchy---differences in power and status among organizational actors---on collective learning in organizations and groups. We begin with the observation that theories of organization ... Keywords: organizational and group learning, power and status, social hierarchy

J. Stuart Bunderson; Ray E. Reagans

2011-09-01T23:59:59.000Z

295

Neutrino oscillations present status and outlook  

E-Print Network (OSTI)

I summarize the status of three-flavour neutrino oscillations with date of Oct. 2007, and provide an outlook for the developments to be expected in the near future. Furthermore, I discuss the status of sterile neutrino oscillation interpretations of the LSND anomaly in the light of recent MiniBooNE results, and comment on implications for the future neutrino oscillation program.

Schwetz, Thomas

2008-01-01T23:59:59.000Z

296

Neutrino oscillations: present status and outlook  

E-Print Network (OSTI)

I summarize the status of three-flavour neutrino oscillations with date of Oct. 2007, and provide an outlook for the developments to be expected in the near future. Furthermore, I discuss the status of sterile neutrino oscillation interpretations of the LSND anomaly in the light of recent MiniBooNE results, and comment on implications for the future neutrino oscillation program.

Thomas Schwetz

2007-10-26T23:59:59.000Z

297

Neutrino oscillations: present status and outlook  

Science Conference Proceedings (OSTI)

I summarize the status of three-flavour neutrino oscillations with date of Oct. 2007, and provide an outlook for the developments to be expected in the near future. Furthermore, I discuss the status of sterile neutrino oscillation interpretations of the LSND anomaly in the light of recent MiniBooNE results, and comment on implications for the future neutrino oscillation program.

Schwetz, Thomas [Physics Department, Theory Division, CERN, CH-1211 Geneva 23 (Switzerland)

2008-02-21T23:59:59.000Z

298

APPLICATION FOR PLEASE COMPLETE THIS FORM IN BLACK  

E-Print Network (OSTI)

APPLICATION FOR EMPLOYMENT PLEASE COMPLETE THIS FORM IN BLACK INK OR TYPESCRIPT AND RETURN applicants. For photocopying purposes, please complete this form in black ink. It may be handwritten or typed Black or Black British Caribbean African Other Asian or Asian British Indian Pakistani Bangladeshi

Dahl, Torbjørn Semb

299

CAVITY LIKE COMPLETIONS IN WEAK SANDS PREFERRED UPSTREAM MANAGEMENT PRACTICES  

SciTech Connect

The technology referred to as Cavity Like Completions (CLC) offers a new technique to complete wells in friable and unconsolidated sands. A successfully designed CLC provides significant increases in well PI (performance index) at lower costs than alternative completion techniques. CLC technology is being developed and documented by a partnership of major oil and gas companies through a GPRI (Global Petroleum Research Institute) joint venture. Through the DOE-funded PUMP program, the experiences of the members of the joint venture will be described for other oil and gas producing companies. To date six examples of CLC completions have been investigated by the JV. The project was performed to introduce a new type of completion (or recompletion) technique to the industry that, in many cases, offers a more cost effective method to produce oil and gas from friable reservoirs. The project's scope of work included: (1) Further develop theory, laboratory and field data into a unified model to predict performance of cavity completion; (2) Perform at least one well test for cavity completion (well provided by one of the sponsor companies); (3) Provide summary of geo-mechanical models for PI increase; and (4) Develop guidelines to evaluate success of potential cavity completion. The project tracks the experiences of a joint industry consortium (GPRI No. 17) over a three year period and compiles results of the activities of this group.

Ian Palmer; John McLennan

2004-04-30T23:59:59.000Z

300

Property:FacilityStatus | Open Energy Information  

Open Energy Info (EERE)

FacilityStatus FacilityStatus Jump to: navigation, search Property Name FacilityStatus Property Type String Description Status of the energy generation facility Allows Values Proposed;Under Construction;In Service;Decommissioned Pages using the property "FacilityStatus" Showing 25 pages using this property. (previous 25) (next 25) 3 3-D Metals + In Service + A AB Tehachapi Wind Farm + In Service + AFCEE MMR Turbines + In Service + AG Land 1 + In Service + AG Land 2 + In Service + AG Land 3 + In Service + AG Land 4 + In Service + AG Land 5 + In Service + AG Land 6 + In Service + AVTEC + In Service + Adair Wind Farm I + In Service + Adair Wind Farm II + In Service + Adams Wind Project + In Service + Aegir II + Proposed + Aero Turbine + In Service + Aeroman Repower Wind Farm + In Service +

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Department of Energy Completes Demolition of K-33 Building - Largest  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Demolition of K-33 Building - Demolition of K-33 Building - Largest Completed Demo Project in Oak Ridge History Department of Energy Completes Demolition of K-33 Building - Largest Completed Demo Project in Oak Ridge History September 30, 2011 - 12:00pm Addthis Media Contact Ben Williams http://www.oakridge.doe.gov 865-576-0885 OAK RIDGE, Tenn. - The U.S. Department of Energy's Oak Ridge Environmental Management (EM) program recently completed its largest demolition project to date. The removal of K-33, a former gaseous diffusion uranium enrichment facility spanning 32-acres, was completed several months ahead of schedule. The American Recovery and Reinvestment Act funded the $51 million project. "The expedited removal of K-33 significantly changes our site's landscape, and moves DOE closer to transitioning the East Tennessee

302

Completed Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Completed Projects Completed Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated November 2013) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov Project Construction Photos Completed Projects Print Text Size: A A A RSS Feeds FeedbackShare Page Photos of completed SC projects Advanced Photon Source External link Building 51 and Bevatron D&D .pdf file (1.1MB) LHC ATLAS .pdf file (322KB) LHC CMS .pdf file (166KB) Linac Coherent Light Source .pdf file (4.6MB)

303

Subcontractors complete recovery act-funded demolition under budget  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery act-funded demolition complete Recovery act-funded demolition complete Small business subcontractors complete recovery act-funded demolition under budget Demolition completed $16 million under budget and six months ahead of schedule. April 3, 2012 Recovery Act-funded demolitions complete The Department of Energy's Office of Environmental Management allocated $212 million in Recovery Act funding to Los Alamos. Some $73 million was slated for demolition. Through cost efficiencies, the Lab added two buildings to the demolition list and still finished $16 million under budget and six months ahead of schedule. Contact Small Business Office (505) 667-4419 Email "Their outstanding performance has provided a great service to the environment and the community, resulting in a successful project under the

304

Department of Energy Announces Completion of World's Largest Laser |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Announces Completion of World's Largest Laser Department of Energy Announces Completion of World's Largest Laser Department of Energy Announces Completion of World's Largest Laser March 31, 2009 - 12:00am Addthis WASHINGTON, DC - The Department of Energy today announced that the National Nuclear Security Administration (NNSA) has certified the completion of the historic effort to build the world's largest laser. Housed at the Department of Energy's Lawrence Livermore National Laboratory, the National Ignition Facility (NIF) is expected to allow scientists to achieve fusion ignition in the laboratory, obtaining more energy from the target than is provided by the laser. The completion of NIF opens the door to scientific advancement and discovery that promises to enhance our national security, could help break America's dependence on foreign oil, and will lead to new

305

Natural completions - overcoming the damage caused by drilling and perforations  

SciTech Connect

Natural completions are suggested as a way to avoid or overcome damage to the formation caused by drilling and perforating. Formation damage may take the form of plugged passageways which remain closed because formation pressure does not exceed that of the plug material. Natural completions refer to using maximum differential pressure toward the wellbore, so that such obstructions in passageways can less easily exist. The method allows the formation pressure to backsurge perforation tunnels immediately following detonation of the guns, with the objectives of obtaining deep, clean perforations with the crushed zone and debris completely removed from the perforations. Procedures for natural completions are described and illustrated. A case history is given where the natural completion method restores productivity of a well.

Perry, G.; Smith, G.

1980-04-01T23:59:59.000Z

306

NNSA Successfully Completes W87 Refurbishment | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Successfully Completes W87 Refurbishment | National Nuclear Security Successfully Completes W87 Refurbishment | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > NNSA Successfully Completes W87 Refurbishment NNSA Successfully Completes W87 Refurbishment November 19, 2004 Amarillo TX NNSA Successfully Completes W87 Refurbishment

307

Waste Isolation Pilot Plant Status and Plans - 2010 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status and Plans - 2010 Waste Isolation Pilot Plant Status and Plans - 2010 Overview of WIPP presented by Dr. Dave Moody. Waste Isolation Pilot Plant Status and Plans - 2010 More...

308

UTSI/CFFF MHD program completion and related activities  

DOE Green Energy (OSTI)

Maintenance work on the DOE CFFF facility remained in suspension for the entire quarter in accordance with the stop work order issued the previous quarter. Work resumed on the environmental restoration activities during the quarter and work performed is summarized. Progress continued on the five (5) high temperature superconductivity projects under Task 6. On the sol-gel process, improvement is reported in application of buffer layers to single crystals. Problems are discussed in applying buffer layers to nickel substrates. The status of cost performance studies is summarized. The status of diagnostic measurements directed toward real time control of manufacturing processes is reported with emphasis on measurement of surface smoothness. The results of atomic absorption measurement of MOCVD precursors are reported.

Muehlhauser, J.W.; Chapman, J.N.

1999-04-30T23:59:59.000Z

309

NSLS control system upgrade status  

SciTech Connect

The NSLS control system initially installed in 1978 has undergone several modifications but the basic system architecture remained relatively unchanged. The need for faster response, increased reliability and better diagnostics made the control system upgrade a priority. Since the NSLS runs continuously, major changes to the control system are difficult. The upgrade plan had to allow continuous incremental changes to the control system without having any detrimental effect on operations. The plan had to provide for immediate improvement in a few key areas, such as data access rates, and be complete in a short time. At present, most accelerator operations utilize the upgraded control system.

Smith, J.; Ramamoorthy, S.; Tang, Y.; Flannigan, J.; Sathe, S.; Keane, J.; Krinsky, S.

1993-07-01T23:59:59.000Z

310

Action Item Review and Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Corporate Board Waste Corporate Board Action Items Action Item Resolution Action Item Strategic Planning Initiative Optimization Study Resolution Presentation by S. Schneider (HLW System Integrated Project Team) Pretreatment Whitepaper Presentation by W. Wilmarth (Role of Liquid Waste Pretreatment Technologies in Solving the DOE Clean-up Mission) Draft Charter for Performance Assessment Sub-Committee Presentation by J. Marra (Performance Assessment Community of Practice) Final Report from Slurry Transport Workshop In final stages of review and Approval; will be distributed when complete This document is intended for planning and analysis purposes, assuming a continuing constrained budget environment. Every effort will be made to comply with all applicable environmental and legal obligations,

311

Solar Neutrinos: Status and Prospects  

E-Print Network (OSTI)

We describe the current status of solar neutrino measurements and of the theory -- both neutrino physics and solar astrophysics -- employed in interpreting measurements. Important recent developments include Super-Kamiokande's determination of the neutrino-electron elastic scattering rate for 8B neutrinos to 3%; the latest SNO global analysis in which the inclusion of low-energy data from SNO I and II significantly narrowed the range of allowed values for the neutrino mixing angle theta12; Borexino results for both the 7Be and pep neutrino fluxes, the first direct measurements constraining the rate of ppI and ppII burning in the Sun; global reanalyses of solar neutrino data that take into account new reactor results on theta13; a new decadal evaluation of the nuclear physics of the pp chain and CNO cycle defining best values and uncertainties in the nuclear microphysics input to solar models; recognition of an emerging discrepancy between two tests of solar metallicity, helioseismological mappings of the soun...

Robertson, W C Haxton R G Hamish

2012-01-01T23:59:59.000Z

312

PEM Stack Manufacturing: Industry Status  

NLE Websites -- All DOE Office Websites (Extended Search)

© 2009 BALLARD POWER SYSTEMS INC. ALL RIGHTS RESERVED © 2009 BALLARD POWER SYSTEMS INC. ALL RIGHTS RESERVED JULY 2009 B U I L D I N G A C L E A N E N E R G Y G R O W T H C O M P A N Y B A L L A R D P O W E R S Y S T E M S PEM Stack Manufacturing: Industry Status Duarte R. Sousa, PE August 11, 2011 AUGUST 2009 P A G E 2 Overview of PEM Stack Manufacturing MEA Manufacturing Plate Manufacturing Stack Assembly Stack Conditioning and Testing Package and Ship For each of the four main processes, the following will be provided: 1. A brief history of where we have been; 2. Where we are today; 3. Where we would like to transition to; 4. Gaps and proposals. AUGUST 2009 P A G E 3 PEM Stack Manufacturing: Cost Overview * The MEA was readily identified as the major cost driver in a 10 kW stationary stack. * The precious metal catalyst electrode is the major cost driver for the MEA.

313

Hyperforests on the Complete Hypergraph by Grassmann Integral Representation  

E-Print Network (OSTI)

We study the generating function of rooted and unrooted hyperforests in a general complete hypergraph with n vertices by using a novel Grassmann representation of their generating functions. We show that this new approach encodes the known results about the exponential generating functions for the different number of vertices. We consider also some applications as counting hyperforests in the k-uniform complete hypergraph and the one complete in hyperedges of all dimensions. Some general feature of the asymptotic regimes for large number of connected components is discussed.

Bedini, Andrea; Sportiello, Andrea

2008-01-01T23:59:59.000Z

314

Hyperforests on the Complete Hypergraph by Grassmann Integral Representation  

E-Print Network (OSTI)

We study the generating function of rooted and unrooted hyperforests in a general complete hypergraph with n vertices by using a novel Grassmann representation of their generating functions. We show that this new approach encodes the known results about the exponential generating functions for the different number of vertices. We consider also some applications as counting hyperforests in the k-uniform complete hypergraph and the one complete in hyperedges of all dimensions. Some general feature of the asymptotic regimes for large number of connected components is discussed.

Andrea Bedini; Sergio Caracciolo; Andrea Sportiello

2008-02-11T23:59:59.000Z

315

QMA-complete problems for stoquastic Hamiltonians and Markov matrices  

E-Print Network (OSTI)

We show that finding the lowest eigenvalue of a 3-local symmetric stochastic matrix is QMA-complete. We also show that finding the highest energy of a stoquastic Hamiltonian is QMA-complete and that adiabatic quantum computation using certain excited states of a stoquastic Hamiltonian is universal. We also show that adiabatic evolution in the ground state of a stochastic frustration free Hamiltonian is universal. Our results give a new QMA-complete problem arising in the classical setting of Markov chains, and new adiabatically universal Hamiltonians that arise in many physical systems.

Stephen P. Jordan; David Gosset; Peter J. Love

2009-05-28T23:59:59.000Z

316

Inspection apparatus for evaluating a partially completed weld  

SciTech Connect

An inspection apparatus for evaluating a partially completed weld is described and which is utilized in combination with an automated movable welder which moves across a supporting surface, and wherein the inspection apparatus includes a coupling member mounted on the welder; a frame member mounted on the coupling member; an ultrasonic sensor mounted on the frame member and disposed in ultrasonic sound transmitting relation relative to the partially completed weld; and a drive assembly for adjusting the position of the ultrasonic sensor relative to the partially completed weld.

Smartt, Herschel B. (Idaho Falls, ID); Larsen, Eric D. (Idaho Falls, ID); Johnson, Jonn A. (Idaho Falls, ID)

2001-01-01T23:59:59.000Z

317

Training Work Group Status Overview - September 2012 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 2012 Training Work Group Status Overview - September 2012 Documents Available for Download September 2012 Status Overviews More Documents & Publications Training Work...

318

Status Prospects of Green Data Center | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status Prospects of Green Data Center Status Prospects of Green Data Center Information on energy-saving technology research of green data centers and the potential impacts....

319

Joint Maintenance Status Report of Potomac Electric Power Company...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM...

320

Status and Future of TRANSCOM | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Status Upcoming Changes Glimpse at Future Options DOE Commitments Status and Future of TRANSCOM More Documents & Publications Department of Energy Office of Science...

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Cambodia-Status and Potential for the Development of Biofuels...  

Open Energy Info (EERE)

Cambodia-Status and Potential for the Development of Biofuels and Rural Renewable Energy Jump to: navigation, search Name Cambodia-Status and Potential for the Development of...

322

DOE Completes Large-Scale Carbon Sequestration Project Awards | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Completes Large-Scale Carbon Sequestration Project Awards DOE Completes Large-Scale Carbon Sequestration Project Awards DOE Completes Large-Scale Carbon Sequestration Project Awards November 17, 2008 - 4:58pm Addthis Regional Partner to Demonstrate Safe and Permanent Storage of 2 Million Tons of CO2 at Wyoming Site WASHINGTON, DC - Completing a series of awards through its Regional Carbon Sequestration Partnership Program, the U.S. Department of Energy (DOE) today awarded $66.9 million to the Big Sky Regional Carbon Sequestration Partnership for the Department's seventh large-scale carbon sequestration project. Led by Montana State University-Bozeman, the Partnership will conduct a large-volume test in the Nugget Sandstone formation to demonstrate the ability of a geologic formation to safely, permanently and economically

323

NNSA's Global Threat Reduction Initiative Completes First Plutonium  

NLE Websites -- All DOE Office Websites (Extended Search)

Completes First Plutonium Completes First Plutonium Shipment | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > NNSA's Global Threat Reduction Initiative Completes First ... NNSA's Global Threat Reduction Initiative Completes First Plutonium Shipment Posted By NNSA Public Affairs NNSA Blog The United States and Sweden announced today at the 2012 Nuclear Security

324

Workers Complete Demolition of Hanford's Historic Plutonium Vaults |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Workers Complete Demolition of Hanford's Historic Plutonium Workers Complete Demolition of Hanford's Historic Plutonium Vaults Workers Complete Demolition of Hanford's Historic Plutonium Vaults April 1, 2012 - 12:00pm Addthis RICHLAND, Wash. - The Richland Operations Office and contractor CH2M HILL Plateau Remediation Company this month completed demolition of a large plutonium vault complex, formerly one of the highest security facilities at the Hanford site. "This project was a joint safety success between our workers who spent months cleaning out the facilities, the demolition crews who tore the buildings down and the crews who helped remove the waste for disposal. It took teamwork and cooperation to remove the complex safely and efficiently," said Ty Blackford, CH2M HILL Vice President of Decommissioning, Waste, Fuels and Remediation Services.

325

Well completions in the Beta Field, Offshore California  

SciTech Connect

The heavy oil reservoir in the Beta Field, Offshore California is thick (up to 1200 feet gross), unconsolidated, consists of nine distinct sand intervals, and lies at a shallow depth. In order to economically develop the field from two platforms and be able to waterflood, the development wells must be highly deviated with an 'S' shaped profile, have isolated multi-zone completions designed with the capability to selectively inject or produce any combination of zones, and produce virtually sand-free because of the use of electric submersible pumps for artificial lift. To meet these requirements, new completion techniques were developed. This paper reviews the overall completion sequence starting with primary cementing and zonal isolation, through perforating and perforation cleanup, and finishing with the inside casing gravel packing and gravel pack logging. The new techniques have proved expedient and successful, with 40 producing wells containing a total of 152 individual zones completed as of December, 1982.

Bruist, E.H.; Botts, T.M.; Jefferis, R.G.

1983-03-01T23:59:59.000Z

326

DOE Completes TRU Waste Cleanup at Bettis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRU Waste Cleanup at Bettis TRU Waste Cleanup at Bettis DOE Completes TRU Waste Cleanup at Bettis September 23, 2011 - 12:00pm Addthis Media Contact Deb Gill www.wipp.energy.gov 575-234-7270 CARLSBAD, N.M. - The U.S. Department of Energy (DOE) has successfully completed cleanup of all Cold War legacy transuranic (TRU) waste at the Bettis Atomic Power Laboratory (BAPL) near Pittsburgh, Pa., permanently disposing of it at the Waste Isolation Pilot Plant (WIPP). BAPL is the 20th site to be completely cleaned of legacy TRU waste. This milestone was achieved using approximately $640,000 of a $172 million investment from the American Recovery and Reinvestment Act to expedite legacy waste cleanup activities across the DOE complex. This summer, TRU waste cleanup was also completed at the Nuclear Radiation Development, LLC,

327

Energy Department Completes Cool Roof Installation on DC Headquarters  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Completes Cool Roof Installation on DC Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy Energy Department Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy December 14, 2010 - 12:00am Addthis Washington - Secretary Steven Chu today announced the completion of a new cool roof installation on the Department of Energy's Headquarters West Building. There was no incremental cost to adding the cool roof as part of the roof replacement project and it will save taxpayers $2,000 every year in building energy costs. Cool roofs use lighter-colored roofing surfaces or special coatings to reflect more of the sun's heat, helping improve building efficiency, reduce cooling costs and offset carbon emissions. The cool roof and increased insulation at the facility were

328

Energy Department Completes Salt Coolant Material Transfer to Czech  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Completes Salt Coolant Material Transfer to Czech Completes Salt Coolant Material Transfer to Czech Republic for Advanced Reactor Research Energy Department Completes Salt Coolant Material Transfer to Czech Republic for Advanced Reactor Research May 20, 2013 - 12:52pm Addthis News Media Contact (202) 586-4940 PRAGUE, CZECH REPUBLIC - The U.S. Department of Energy recently joined with the U.S. Embassy in Prague and the Czech Republic's Ministry of Industry and Trade to complete the transfer of 75 kilograms of fluoride salt from the Department's Oak Ridge National Laboratory (ORNL) to the Czech Nuclear Research Institute Řež for experiments at Řež's critical test facility. This partnership builds on a strong history of U.S.-Czech energy collaboration and follows President Obama's speech in Prague in April 2009, where he laid out the importance of international

329

DOE Completes Large-Scale Carbon Sequestration Project Awards | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Completes Large-Scale Carbon Sequestration Project Awards Completes Large-Scale Carbon Sequestration Project Awards DOE Completes Large-Scale Carbon Sequestration Project Awards November 17, 2008 - 4:58pm Addthis Regional Partner to Demonstrate Safe and Permanent Storage of 2 Million Tons of CO2 at Wyoming Site WASHINGTON, DC - Completing a series of awards through its Regional Carbon Sequestration Partnership Program, the U.S. Department of Energy (DOE) today awarded $66.9 million to the Big Sky Regional Carbon Sequestration Partnership for the Department's seventh large-scale carbon sequestration project. Led by Montana State University-Bozeman, the Partnership will conduct a large-volume test in the Nugget Sandstone formation to demonstrate the ability of a geologic formation to safely, permanently and economically

330

Oak Ridge Environmental Management Program Completes Work at Bethel Valley  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ridge Environmental Management Program Completes Work at Bethel Ridge Environmental Management Program Completes Work at Bethel Valley Burial Grounds Oak Ridge Environmental Management Program Completes Work at Bethel Valley Burial Grounds September 1, 2011 - 12:00pm Addthis Media Contact Ben Williams http://www.oakridge.doe.gov 865-576-0885 OAK RIDGE, Tenn. - The U.S. Department of Energy's (DOE) Oak Ridge Environmental Management (EM) program recently completed upgrades and soil remediation work at the Bethel Valley Burial Grounds, using approximately $17.5 million in American Recovery and Reinvestment Act funds. Oak Ridge's EM program was able to use Recovery Act funds to address five areas needing improvement, including Solid Waste Storage Areas 1 and 3. This included removing contaminated soil ("hot spots"), diverting clean

331

Secretary Chu Announces Completion of Critical Energy Conservation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Completion of Critical Energy Conservation Completion of Critical Energy Conservation Appliance Standards Secretary Chu Announces Completion of Critical Energy Conservation Appliance Standards September 1, 2009 - 12:00am Addthis Washington, DC - U.S. Energy Secretary Steven Chu announced today that the Department of Energy has completed energy efficiency standards for a critical group of appliances that will together save up to 1.1 billion metric tons of carbon dioxide once in effect. In February 2009, President Obama visited the Department of Energy to emphasize the importance of quickening the pace of energy conservation standards for appliances, while continuing to meet legal and statutory deadlines. Yesterday, the minimum energy efficiency standards for beverage vending machines - the last of the

332

LANL completes excavation of 1940s waste disposal site  

NLE Websites -- All DOE Office Websites (Extended Search)

LANL completes excavation LANL completes excavation LANL completes excavation of 1940s waste disposal site The excavation removed about 43,000 cubic yards of contaminated debris and soil from the six-acre site. September 22, 2011 Workers sample contents of LANL's Material Disposal Area B (MDA-B) before excavation Workers sample contents of LANL's Material Disposal Area B (MDA-B) before excavation. Contact Colleen Curran Communicatons Office (505) 664-0344 Email LOS ALAMOS, New Mexico, September 22, 2011-Los Alamos National Laboratory has completed excavation of its oldest waste disposal site, Material Disposal Area B (MDA-B). The excavation removed about 43,000 cubic yards of contaminated debris and soil from the six-acre site. MDA-B was used from 1944-48 as a waste disposal site for Manhattan Project and Cold War-era research and

333

Idaho Site Completes Cleanup Milestone Ahead of Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

News Media Contact: News Media Contact: Erik Simpson (208) 360-0426 For Immediate Release Date: June 23, 2010 Idaho Site Completes Cleanup Milestone Ahead of Schedule Idaho Falls, ID � The Department of Energy�s Idaho Operations Office, through the efforts of its cleanup contractor, CH2M-WG Idaho (CWI), recently reached a key cleanup milestone three weeks ahead of schedule by completing the transfer of nearly 6.6 metric tons of spent nuclear fuel from wet to dry storage. �The transfer of spent nuclear fuel from wet to dry storage represents a major contract milestone completion by CWI, a five year endeavor,� said Jim Cooper, DOE-ID Acting Deputy Manager for the Idaho Cleanup Project. �Completion of this campaign places the spent fuel in a safer configuration for the environment, complies with DOE�s commitment to the

334

Idaho Workers Complete Last of Transuranic Waste Transfers Funded by  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Workers Complete Last of Transuranic Waste Transfers Funded Workers Complete Last of Transuranic Waste Transfers Funded by Recovery Act Idaho Workers Complete Last of Transuranic Waste Transfers Funded by Recovery Act American Recovery and Reinvestment Act workers successfully transferred 130 containers of remote-handled transuranic waste – each weighing up to 15 tons – to a facility for repackaging and shipment to a permanent disposal location. As part of a project funded by $90 million from the Recovery Act, the final shipment of the containers from the Materials and Fuels Complex recently arrived at the Idaho Nuclear Technology and Engineering Center (INTEC). Idaho Workers Complete Last of Transuranic Waste Transfers Funded by Recovery Act More Documents & Publications EIS-0203-SA-03: Supplement Analysis

335

Secretary Bodman Celebrates Clean Up Completion of Three Former Weapons  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clean Up Completion of Three Former Clean Up Completion of Three Former Weapons Research and Production Sites in Ohio Secretary Bodman Celebrates Clean Up Completion of Three Former Weapons Research and Production Sites in Ohio January 19, 2007 - 9:59am Addthis Over 1,100 Acres in Fernald, Columbus and Ashtabula Restored CROSBY TOWNSHIP, OH - U.S. Secretary of Energy Samuel W. Bodman today certified that environmental cleanup is complete at three former weapons research and production facilities in Ohio. In a ceremony at the Fernald site, Secretary Bodman, joined by Environmental Protection Agency (EPA) Administrator Stephen L. Johnson and U.S. Senator George Voinovich (R-OH), commemorated the efforts of thousands of workers for their contributions at the Fernald Closure site in Crosby Township, the Columbus Closure site at

336

NNSA's Global Threat Reduction Initiative Completes First Plutonium  

National Nuclear Security Administration (NNSA)

Completes First Plutonium Completes First Plutonium Shipment | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > NNSA's Global Threat Reduction Initiative Completes First ... NNSA's Global Threat Reduction Initiative Completes First Plutonium Shipment Posted By NNSA Public Affairs NNSA Blog The United States and Sweden announced today at the 2012 Nuclear Security

337

Richland Operations Office Completes Cleanup in Hanford's 300...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

sewer system - was removed from the 300-15 Waste Site in the north section. RICHLAND, Wash. - EM met a Tri-Party Agreement milestone by completing cleanup of the north portion of...

338

Long alternating cycles in edge-colored complete graphs  

Science Conference Proceedings (OSTI)

Let Knc denote a complete graph on n vertices whose edges are colored in an arbitrary way. And let ?(Knc) denote the maximum number of edges of the same ... Keywords: alternating cycle, color degree, edge-colored graph

Hao Li; Guanghui Wang; Shan Zhou

2007-08-01T23:59:59.000Z

339

Smoothing of pipe system completion processes in a shipyard environment/  

E-Print Network (OSTI)

Due to a number of different production issues, the manufacture of template pipes is often delayed. These delays hold up pipe system completion on board the ships in production and can delay payments from the Ministry of ...

Zojwalla, Shaheen J. (Shaheen Joyab), 1977-

2004-01-01T23:59:59.000Z

340

Guide to Complete SSO (Single Sign-On) Registration  

Annual Energy Outlook 2012 (EIA)

Guide to Complete EIA SSO (Single Sign-On) Registration 1. Open your Internet Browser, enter this address, and press Enter https:signon.eia.doe.govssoserverlogin 1 L6533:prj...

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

U.S. Geothermal Announces Successful Completion of First Well...  

Open Energy Info (EERE)

Number NA DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for U.S. Geothermal Announces Successful Completion of First Well at Neal Hot...

342

SRS Commemorates P & R Reactor Area Completions - SRS Closes...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SRS Commemorates P & R Reactor Area Completions - SRS Closes the Door on Past Cold War Operations and Opens the Door for Future Missions through Enterprise SRS SRS Commemorates P &...

343

Idaho Cleanup Project grows its workforce to complete ARRA work  

NLE Websites -- All DOE Office Websites (Extended Search)

Idaho Cleanup Project grows its workforce to complete ARRA work CWI President and CEO John Fulton greets newly hired ICP employees at a June orientation session in Idaho Falls....

344

Three veterans complete summer internships at Lawrence Livermore  

NLE Websites -- All DOE Office Websites (Extended Search)

complete the inaugural Veteran Internship Program (VIP). The program combines their education at Las Positas with a hands-on internship at the Lab. East Bay funded the Lab...

345

June 30, 2008: US portion of Large Hadron Collider completed  

Energy.gov (U.S. Department of Energy (DOE))

June 30, 2008The Department and the National Science Foundation announce that the U.S. contribution to the Large Hadron Collider (LHC) has been completed on budget and ahead of schedule. The LHC,...

346

A Sound (and Complete) Model of Contracts Matthias Blume  

E-Print Network (OSTI)

A Sound (and Complete) Model of Contracts Matthias Blume Toyota Technological Institute at Chicago blume@tti-c.org David McAllester Toyota Technological Institute at Chicago mcallester@tti-c.org Abstract

McAllester, David

347

Influence of projectile - breakup threshold on complete fusion  

E-Print Network (OSTI)

Complete fusion excitations for 11,10B+159Tb have been measured at energies around the respective Coulomb barriers, and the existing complete fusion measurements for 7Li+159Tb have been extended to higher energies. The measurements show significant reduction of complete fusion cross sections at above-barrier energies for both the reactions, 10B+159Tb and 7Li+159Tb, when compared to those for 11B+159Tb. The comparison shows that the extent of suppression of complete fusion cross sections is correlated with the -separation energies of the projectiles. Also, the two reactions, 10B+159Tb and 7Li+159Tb were found to produce incomplete fusion products at energies near the respective Coulomb barriers, with the - particle emitting channel being the favoured incomplete fusion process in both the cases.

A. Mukherjee; Subinit Roy; M. K. Pradhan; M. Saha Sarkar; P. Basu; B. Dasmahapatra; T. Bhattacharya; S. Bhattacharya; S. K. Basu; A. Chatterjee; V. Tripathi; S. Kailas

2006-03-24T23:59:59.000Z

348

Path predicate abstraction by complete interval property checking  

Science Conference Proceedings (OSTI)

This paper describes a method to create an abstract model from a set of properties fulfilling a certain completeness criterion. The proposed abstraction can be understood as a path predicate abstraction. As in predicate abstraction, certain concrete ...

Joakim Urdahl; Dominik Stoffel; Jrg Bormann; Markus Wedler; Wolfgang Kunz

2010-10-01T23:59:59.000Z

349

Innovative Heat Shield Structure Completed for Orion - Materials ...  

Science Conference Proceedings (OSTI)

Posted on: 3/1/2010 12:00:00 AM... Lockheed Martin announced on March 1 that it has completed fabrication of the world's largest heat shield structure.

350

NNSA, LANL Complete DARHT Improvements With Successful Multi-frame  

NLE Websites -- All DOE Office Websites (Extended Search)

LANL Complete DARHT Improvements With Successful Multi-frame LANL Complete DARHT Improvements With Successful Multi-frame Hydrodynamic Test | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Press Releases > NNSA, LANL Complete DARHT Improvements With Successful ... Press Release NNSA, LANL Complete DARHT Improvements With Successful Multi-frame

351

Microsoft Word - Goal FTCP Action Plan Status September 6 2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2012 6, 2012 Goal 3 Improve FTCP Management Processes Champions: Ted Wyka, Office of Security Operations and Pat Worthington, Office of Health and Safety Objective 1: Workforce Analysis: Improving the FTCP Workforce Analysis as an Effective Tool to be Used in Other Baseline Staffing Activities Champions: Dary Newbry Accomplishments/Status * Identify available Workforce Analysis Tools. Date: March 31, 2012  Complete. o Solicitated agents for input of which three primary Workforce Analysis Tools were identified: Experience based; Facility Representative Staffing Analysis; and, SSO Staffing Analysis * Evaluate tools for application in the FTCP Workforce Analysis. Date: June 30, 2012  Complete. o Evaluation included comparison between current methodology and available

352

Property:NEPA Completion Notes | Open Energy Information  

Open Energy Info (EERE)

Completion Notes Completion Notes Jump to: navigation, search Property Name NEPA Completion Notes Property Type Text Pages using the property "NEPA Completion Notes" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 8/2: Data reviewed for completion C CA-017-05-051 + 8/9 Data entry complete. Attached FONSI does not seem to be fully related to the attached EA. The FONSI is for a geothermal well and slimhole exploration project and the EA is for a pipeline project. Need to add Public Health and Safety as a resource 8/22/13 - The 'FONSI/DR is actually for EA CA-170-02-15 Bassalt Canyon..dated Jan 2002 KW 8/26/13 - I deleted the FONSI from this page. Filename is incorrect for the file and stands as "CA-017-05-51-EA-DR -FONSI.pdf," Andrew Gentile. Unable to find Final EA or FONSI online. When RMP added, add "Inyo National Forest "Land and Resource Management Plan" (LRMP) 1988"

353

GRR Status Update - given 2013-06-26.pptx  

Open Energy Info (EERE)

Doug Hollett Doug Hollett Geothermal Technologies Program Manager Kate Young NREL Principal Investigator June 26, 2013 2 | US DOE Geothermal Program eere.energy.gov Status U pdate * Roadmap C ontent * Analyses * Web I nterface * White P apers Moving F orward Meeting Agenda 3 | US DOE Geothermal Program eere.energy.gov Colorado * Colorado agency/industry review: March 6, 2013 * Completed à through agency and legal review * Now available online Texas * Texas agency/industry review: June 12, 2013 * Comments being incorporated and re-reviewed by agencies * Flowcharts available online * Full content with legal review: scheduled for July 15 GRR Content Technology W hite P apers Web I nterface Roadmap Future P lans PermiBng A nalysis 4 | US DOE Geothermal Program eere.energy.gov

354

Containment atmosphere response (CAR) program. Second status report. [HTGR  

Science Conference Proceedings (OSTI)

This report contains a summary of the work performed under the Containment Atmosphere Response (CAR) Program of the High-Temperature Gas-Cooled Reactor (HTGR) Safety Research Task since the publication of the previous status report (February 1978). The work concentrated on development of models describing containment phenomena during core heatup in support of probabilistic risk assessment studies. Models were completed for fission product iodine sorption on coated surfaces, diffusivity and retentivity of untreated concrete, iodine interaction with condensing steam on the containment atmosphere boundaries, and the cleanup filter system. These models were incorporated into a new computer program called CARCAS, a substantial extension of the CNTB computer program, and applied to Accident Initiation and Progression Analysis for Phase II core heatup sequences. Development was begun on models describing the postulated behavior of particulate fission products or aerosols within and leaking out of the containment.

Landoni, J.A.

1980-03-01T23:59:59.000Z

355

Microsoft PowerPoint - Denison Status.ppt [Compatibility Mode]  

NLE Websites -- All DOE Office Websites (Extended Search)

DENISON TURBINE DENISON TURBINE REHABILITATION PLANNING REHABILITATION PLANNING Status Report Southwestern Federal Hydropower Conference 10 June 2010 By: Charlie Allen Chief, Turbomachinery Section y Hydroelectric Design Center US Army Corps of Engineers BUILDING STRONG ® Historic Context Historic Context Late 1990's: Index Testing, 4% Efficiency Decrease g y Early 2000's: Generator Uprate Study Mid 2000's: Generator Rewinds Completed Capacity increase from 42.3 KVA to 53.5 KVA Capacity increase from 42.3 KVA to 53.5 KVA BUILDING STRONG ® PORTLAND DISTRICT 2 Unit Condition Unit Condition Units installed in late 1940's Badly Corroded Wicket Gates, Facing Plates, Stay Vanes Excessive Wicket Gate Leakage Brake Speed Switches reset to compensate Brake Speed Switches reset to compensate Runner Blade Entrance Edge Cavitation

356

The ANTARES Neutrino Telescope: status and first results  

E-Print Network (OSTI)

Completed in May 2008, the ANTARES neutrino telescope is located in the Mediterranean Sea, 40 km off the coast of Toulon, at a depth of about 2500 m. Consisting of 12 detector lines housing nearly 900 optical modules, the ANTARES telescope is currently the largest neutrino detector in the northern hemisphere. Utilising the Mediterranean Sea as a detecting medium, the detection principle of ANTARES relies on the observation of Cherenkov photons emitted by charged relativistic leptons, produced through neutrino interactions with the surrounding water and seabed, using a 3 dimensional lattice of photomultiplier tubes. In this paper we review the current status of the ANTARES experiment, highlighting some of the results from it's first year of full operation.

Brown, Anthony M

2009-01-01T23:59:59.000Z

357

Qweak: A search for new physics status update  

DOE Green Energy (OSTI)

Qweak is a currently running experiment at the Thomas Jefferson National Accelerator Facility that uses parity-violating elastic electron-proton scattering to measure the weak charge of the proton (Q{sub weak}{sup P}). This experiment is a sensitive test for physics beyond the Standard Model, as Q{sub weak}{sup P} is well predicted in the Standard Model. Qweak will measure an expected {approx}200 ppb asymmetry to 4% and will be the first direct measurement of Q{sub weak}{sup P}. The precision generated will allow the probing of certain classes of new physics up to 2.5 TeV. Longitudinally polarized electrons are scattered off a liquid hydrogen target and pass through a toroidal-field magnetic spectrometer. The 4% measurement requires 2500 hours of 85% polarized electron beam. In this paper, the design and status of the complete experiment including the details of the asymmetry measurements will be discussed.

John Leckey, Qweak Collaboration

2012-04-01T23:59:59.000Z

358

Status of the Dark Energy Survey Camera (DECam) Project  

SciTech Connect

The Dark Energy Survey Collaboration has completed construction of the Dark Energy Camera (DECam), a 3 square degree, 570 Megapixel CCD camera which will be mounted on the Blanco 4-meter telescope at CTIO. DECam will be used to perform the 5000 sq. deg. Dark Energy Survey with 30% of the telescope time over a 5 year period. During the remainder of the time, and after the survey, DECam will be available as a community instrument. All components of DECam have been shipped to Chile and post-shipping checkout finished in Jan. 2012. Installation is in progress. A summary of lessons learned and an update of the performance of DECam and the status of the DECam installation and commissioning will be presented.

Flaugher, Brenna L.; Abbott, Timothy M.C.; Angstadt, Robert; Annis, Jim; Antonik, Michelle, L.; Bailey, Jim; Ballester, Otger.; Bernstein, Joseph P.; Bernstein, Rebbeca; Bonati, Marco; Bremer, Gale; /Fermilab /Cerro-Tololo InterAmerican Obs. /ANL /Texas A-M /Michigan U. /Illinois U., Urbana /Ohio State U. /University Coll. London /LBNL /SLAC /IFAE

2012-06-29T23:59:59.000Z

359

Solar Neutrinos: Status and Prospects  

E-Print Network (OSTI)

We describe the current status of solar neutrino measurements and of the theory -- both neutrino physics and solar astrophysics -- employed in interpreting measurements. Important recent developments include Super-Kamiokande's determination of the neutrino-electron elastic scattering rate for 8B neutrinos to 3%; the latest SNO global analysis in which the inclusion of low-energy data from SNO I and II significantly narrowed the range of allowed values for the neutrino mixing angle theta12; Borexino results for both the 7Be and pep neutrino fluxes, the first direct measurements constraining the rate of ppI and ppII burning in the Sun; global reanalyses of solar neutrino data that take into account new reactor results on theta13; a new decadal evaluation of the nuclear physics of the pp chain and CNO cycle defining best values and uncertainties in the nuclear microphysics input to solar models; recognition of an emerging discrepancy between two tests of solar metallicity, helioseismological mappings of the sound speed in the solar interior, and analyses of the metal photoabsorption lines based on our best current description of the Sun's photosphere; a new round of standard solar model calculations optimized to agree either with helioseismology or with the new photospheric analysis; and, motivated by the solar abundance problem, the development of nonstandard, accreting solar models, in order to investigate possible consequences of the metal segregation that occurred in the proto-solar disk. We review this progress and describe how new experiments such as SNO+ could help us further exploit neutrinos as a unique probe of stellar interiors.

W. C. Haxton; R. G. Hamish Robertson; Aldo M. Serenelli

2012-08-28T23:59:59.000Z

360

Status of Data Import into EIDR  

NLE Websites -- All DOE Office Websites (Extended Search)

Status of Data Import into EIDR February 10, 2007 This page describes data generated by ESPP that have been uploaded to LBNL (using Biofiles, EDR, or ftp), but that have not yet...

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

SNS Operating Status | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

SNS Operating Status Alerts SNS Operating Status Alerts Receive updates about the SNS beam status via text messages to your cell phone and/or e-mail by signing up here. The instrument hall coordinators will communicate any significant beam status changes including beam start, beam down, planned and unplanned outages, and unanticipated schedule changes such as delays. On the registration, enter your e-mail address to receive e-mail updates or to receive text messages enter the information below that is specific to your cell phone provider: Carrier Email to SMS Gateway Alltel [10-digit phone number]@message.alltel.com Example:1234567890@message.alltel.com AT&T (formerly Cingular) [10-digit phone number]@txt.att.net [10-digit phone number]@mms.att.net (MMS) [10-digit phone number]@cingularme.com

362

Status of Chemical Freeze-Out  

E-Print Network (OSTI)

The status of the energy dependence of the chemical freeze-out temperature and chemical potential obtained in heavy ion collisions is presented. Recent proposals for chemical freeze-out conditions are compared.

J. Cleymans; H. Oeschler; K. Redlich; S. Wheaton

2006-07-14T23:59:59.000Z

363

National Hydrogen Learning Demonstration Status (Presentation)  

DOE Green Energy (OSTI)

This presentation discusses U.S. DOE Learning Demonstration Project goals, fuel cell vehicle and H2 station deployment status, and technical highlights of vehicle and infrastructure analysis results and progress.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

2012-02-01T23:59:59.000Z

364

Status of Heavy-lepton Searches  

DOE R&D Accomplishments (OSTI)

Searches for heavy leptons using e{sup +}e{sup -} annihilation, lepton-hadron collisions, photon-hadron collisions, hadron-hadron collisions, and studies of macroscopic matter are reviewed. The present experimental status and future possibilities are summarized.

Perl, M. L.

1981-06-00T23:59:59.000Z

365

Weekly Petroleum Status Report - Energy Information Administration  

U.S. Energy Information Administration (EIA)

Weekly Petroleum Status Report/Energy Information Administration v U.S. crude oil refinery inputs averaged over 14.5 million barrels per day during the week ending ...

366

HFIR Operating Status | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

Current Operating Status of HFIR HFIR reactor building with sun and sky in background As of 13:19:50 10192013, Reactor Power is at 84 MW The reactor is currently operating at...

367

Machine Status | Argonne Leadership Computing Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Machine Status Science on Mira Cores Core Hours Atomistic Simulations of Nanoscale Oxides and Oxide Interfaces 65536 1297201.9256901 Lattice QCD 16384 28881.396622179 MockBOSS :...

368

Electrical Network Supervisor Status Report  

E-Print Network (OSTI)

During year 2000 CERN has installed the Electrical Network Supervisor (ENS) for the monitoring and control of the equipment of the electrical distribution network located in about 100 substations throughout the different sites. In the first phase the system has been installed in parallel with the original CERN-developed system and databases and mimic diagrams have been prepared to cover parts of the distribution network. The system has been integrated with the general ST supervision systems for alarms monitoring and measurement logging, and the data from the ENS are gradually being integrated. In the second phase an extension of the system has been tested to include a direct industrial interface with the electrical equipment without the need for the existing CERN equipment interfaces. During the 2000-2001 shutdown the supervision will be renovated in a number of zones to operate a complete industrial system covering all aspects of the supervision from equipment interfaces to end-user applications.

Poulsen, S

2001-01-01T23:59:59.000Z

369

status of the latest research and development  

NLE Websites -- All DOE Office Websites (Extended Search)

status of the latest research and development (R&D) activities. In status of the latest research and development (R&D) activities. In addition, the website, which is accessible from the NETL homepage, contains updated material on the program's Core R&D, Infrastructure, and Global Collaborations elements; a modified Frequently Asked Questions (FAQ) section; a section highlighting the National Carbon Sequestration Database and Geographic Information System

370

Department of Energy Completes Five Recovery Act Projects - Moves Closer to Completing Recovery Act Funded Work at Oak Ridge Site  

Energy.gov (U.S. Department of Energy (DOE))

OAK RIDGE, Tenn. - The U.S. Department of Energys (DOE) Environmental Management (EM) program recently completed five projects at the Oak Ridge site funded through the American Recovery and Reinvestment Act.

371

First Principles Calculations of Oxygen Vacancy Formation and Migration in Ba1?xSrxCo1?yFeyO3?? Perovskites  

Science Conference Proceedings (OSTI)

Based on first principles DFT calculations, we analyze oxygen vacancy formation and migration energies as a function of chemical composition in complex multicomponent (Ba,Sr)(Co,Fe)O3?? perovskites which are candidate materials for SOFC cathodes and permeation membranes. The atomic relaxation, electronic charge redistribution and energies of the transition states of oxygen migration are compared for several perovskites to elucidate the atomistic reason for the exceptionally low migration barrier in Ba0.5Sr0.5Co0.8Fe0.2O3?? that was previously determined experimentally. The critical comparison of Ba1?xSrxCo1?yFeyO3?? perovskites with different cation compositions and arrangements shows that in addition to the geometric constraints the electronic structure plays a considerable role for the height of the oxygen migration barrier in these materials. These findings help understand advantages and limitations of the fast oxygen permeation and exchange properties of Ba0.5Sr0.5Co0.8Fe0.2O3??.

Merkle, Rotraut; Mastrikov, Yuri; Kotomin, Eugene Alexej; Kukla, Maija M.; Maier, Joachim

2011-12-28T23:59:59.000Z

372

Richland Operations Office Completes Cleanup in Hanford's 300 Area North  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Richland Operations Office Completes Cleanup in Hanford's 300 Richland Operations Office Completes Cleanup in Hanford's 300 Area North Section Richland Operations Office Completes Cleanup in Hanford's 300 Area North Section March 28, 2013 - 12:00pm Addthis An aerial view of Hanford’s 300 Area North Section following completion of cleanup. An aerial view of Hanford's 300 Area North Section following completion of cleanup. Workers demolish the 384 Building, known as the Power House and Heating Plant, in the north portion of the 300 Area. Workers demolish the 384 Building, known as the Power House and Heating Plant, in the north portion of the 300 Area. More than 8,000 feet of pipe — part of the 300 Area’s process sewer system — was removed from the 300-15 Waste Site in the north section. More than 8,000 feet of pipe - part of the 300 Area's process sewer

373

Richland Operations Office Completes Cleanup in Hanford's 300 Area North  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Richland Operations Office Completes Cleanup in Hanford's 300 Richland Operations Office Completes Cleanup in Hanford's 300 Area North Section Richland Operations Office Completes Cleanup in Hanford's 300 Area North Section March 28, 2013 - 12:00pm Addthis An aerial view of Hanford’s 300 Area North Section following completion of cleanup. An aerial view of Hanford's 300 Area North Section following completion of cleanup. Workers demolish the 384 Building, known as the Power House and Heating Plant, in the north portion of the 300 Area. Workers demolish the 384 Building, known as the Power House and Heating Plant, in the north portion of the 300 Area. More than 8,000 feet of pipe — part of the 300 Area’s process sewer system — was removed from the 300-15 Waste Site in the north section. More than 8,000 feet of pipe - part of the 300 Area's process sewer

374

Status of DOE A-76 Studies  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FY 0203 Standard 156 22 Contractors Completed-Decision December 2003 (MEO win) 31M Graphics FY 0203 Standard 13 Completed-Decision September 2003 (MEO win) 4.3M Civil Rights...

375

INNOVATIONS IN NUCLEAR INFRASTRUCTURE AND EDUCATION (INIE) CONSORTIA - CURRENT STATUS  

SciTech Connect

This presentation discusses the current status of innovations in the Nuclear Infrastructure and Education (INIE) Consortia.

Fjeld, R.A.; Gutteridge, J.; Williamson, C.

2004-10-06T23:59:59.000Z

376

FTCP Senior Technical Safety Manager (STSM) Status Report  

Energy.gov (U.S. Department of Energy (DOE))

List of Senior Technical Safety Manager Positions, Base Requirements, Compensatory Measures and Qualification Status.

377

F Reactor Area Cleanup Complete | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

F Reactor Area Cleanup Complete F Reactor Area Cleanup Complete F Reactor Area Cleanup Complete September 19, 2012 - 12:00pm Addthis Media Contact Cameron Hardy, DOE Cameron.Hardy@rl.doe.gov 509-376-5365 RICHLAND, Wash. - U.S. Department of Energy (DOE) contractors have cleaned up the F Reactor Area, the first reactor area at the Hanford Site in southeastern Washington state to be fully remediated. While six of Hanford's nine plutonium production reactors have been sealed up, or cocooned, the F Reactor Area is the first to have all of its associated buildings and waste sites cleaned up in addition to having its reactor sealed up. "The cleanup of the F Reactor Area shows the tremendous progress workers are making along Hanford's River Corridor," said Dave Huizenga, Senior Advisor for the DOE Office of Environmental Management. "The River

378

Remarks at the Capability Replacement Laboratory (CRL) Completion Ceremony  

NLE Websites -- All DOE Office Websites (Extended Search)

at the Capability Replacement Laboratory (CRL) Completion Ceremony at the Capability Replacement Laboratory (CRL) Completion Ceremony by Deputy Administrator Anne M. Harrington | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Speeches > Remarks at the Capability Replacement Laboratory (CRL) ... Speech Remarks at the Capability Replacement Laboratory (CRL) Completion Ceremony

379

EM's Los Alamos TRU Waste Campaign Heads Toward Completion | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM's Los Alamos TRU Waste Campaign Heads Toward Completion EM's Los Alamos TRU Waste Campaign Heads Toward Completion EM's Los Alamos TRU Waste Campaign Heads Toward Completion November 20, 2013 - 12:00pm Addthis Advanced techniques allowed crews at Los Alamos National Laboratory to decontaminate large boxes of waste so it could be shipped as mixed low-level rather than transuranic waste. Advanced techniques allowed crews at Los Alamos National Laboratory to decontaminate large boxes of waste so it could be shipped as mixed low-level rather than transuranic waste. The EM program at Los Alamos National Laboratory exceeded its shipping goals in fiscal year 2013, shipping twice as much waste as it did in fiscal year 2012. The EM program at Los Alamos National Laboratory exceeded its shipping goals in fiscal year 2013, shipping twice as much waste as it did in fiscal

380

Brookhaven Lab Completes Decommissioning of Graphite Research Reactor:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Brookhaven Lab Completes Decommissioning of Graphite Research Brookhaven Lab Completes Decommissioning of Graphite Research Reactor: Reactor core and associated structures successfully removed; waste shipped offsite for disposal Brookhaven Lab Completes Decommissioning of Graphite Research Reactor: Reactor core and associated structures successfully removed; waste shipped offsite for disposal September 1, 2012 - 12:00pm Addthis The Brookhaven Graphite Research Reactor’s bioshield, which contains the 700-ton reactor core, is shown prior to decommissioning. The Brookhaven Graphite Research Reactor's bioshield, which contains the 700-ton reactor core, is shown prior to decommissioning. Pictured here is the Brookhaven Graphite Research Reactor, where major decommissioning milestones were recently reached after the remaining radioactive materials from the facility’s bioshield were shipped to a licensed offsite disposal facility.

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

EM to Proceed with Demolition Following Completion of Cascade Cleanout  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Proceed with Demolition Following Completion of Cascade to Proceed with Demolition Following Completion of Cascade Cleanout Operations EM to Proceed with Demolition Following Completion of Cascade Cleanout Operations July 1, 2012 - 12:00pm Addthis X-326 Facility Manager Jack Tully, left to right, DOE Site Lead Joel Bradburne and Operator Russ Nickell stand in the local control room after the last processing equipment that had been operating in the uranium enrichment cascade at the Portsmouth site in Piketon was shut down. X-326 Facility Manager Jack Tully, left to right, DOE Site Lead Joel Bradburne and Operator Russ Nickell stand in the local control room after the last processing equipment that had been operating in the uranium enrichment cascade at the Portsmouth site in Piketon was shut down. The last equipment that had been operating in the uranium enrichment cascade at the Portsmouth site in Piketon was powered off May 30 after more than 57 years of operation.

382

EERE Celebrates Completion of 1 Million Weatherized American Homes |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EERE Celebrates Completion of 1 Million Weatherized American Homes EERE Celebrates Completion of 1 Million Weatherized American Homes EERE Celebrates Completion of 1 Million Weatherized American Homes September 27, 2012 - 10:07am Addthis 1 of 6 David Poindexter with Veterans Green Jobs, puts moisture barrier and insulation into the crawl space of this Lakewood, Colorado, home. This home is part of the Energy Department's Weatherization Assistance Program that supports energy efficiency upgrades to low-income homes in Denver. In addition, the Department's Weatherization and Intergovernmental Program supports development of National Residential Retrofit Guidelines that will improve worker training and workforce development for weatherization and home improvement workers and enable these industries to increase the value of their services to homeowners. | Photo courtesy of Dennis Schroeder,

383

Waste Treatment Facility Passes Federal Inspection, Completes Final  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Treatment Facility Passes Federal Inspection, Completes Final Waste Treatment Facility Passes Federal Inspection, Completes Final Milestone, Begins Startup Waste Treatment Facility Passes Federal Inspection, Completes Final Milestone, Begins Startup April 23, 2012 - 12:00pm Addthis Media Contact Erik Simpson, 208-390-9464 Danielle Miller, 208-526-5709 The Idaho site today initiated the controlled, phased startup of a new waste treatment facility scheduled to begin treating 900,000 gallons of radioactive liquid waste stored in underground tanks at a former Cold War spent nuclear fuel reprocessing facility next month. A U.S. Department of Energy (DOE) operational readiness review team (made up of Subject Matter Experts across the country) in early April identified a dozen issues for the cleanup contractor CH2M-WG Idaho, LLC (CWI) to

384

Celebrating the Completion of 1 Million Weatherized American Homes |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Celebrating the Completion of 1 Million Weatherized American Homes Celebrating the Completion of 1 Million Weatherized American Homes Celebrating the Completion of 1 Million Weatherized American Homes Addthis 1 of 6 David Poindexter with Veterans Green Jobs, puts moisture barrier and insulation into the crawl space of this Lakewood, Colorado, home. This home is part of the Energy Department's Weatherization Assistance Program that supports energy efficiency upgrades to low-income homes in Denver. In addition, the Department's Weatherization and Intergovernmental Program supports development of National Residential Retrofit Guidelines that will improve worker training and workforce development for weatherization and home improvement workers and enable these industries to increase the value of their services to homeowners. | Photo courtesy of Dennis Schroeder,

385

Complete genome sequence of Cellulomonas flavigena type strain (134T)  

DOE Green Energy (OSTI)

Cellulomonas flavigena (Kellerman and McBeth 1912) Bergey et al. 1923 is the type species of the genus Cellulomonas of the actinobacterial family Cellulomonadaceae. Members of the genus Cellulomonas are of special interest for their ability to degrade cellulose and hemicellulose, particularly with regard to the use of biomass as an alternative energy source. Here we describe the features of this organism, together with the complete genome sequence, and annotation. This is the first complete genome sequence of a member of the genus Cellulomonas, and next to the human pathogen Tropheryma whipplei the second complete genome sequence within the actinobacterial family Cellulomonadaceae. The 4,123,179 bp long single replicon genome with its 3,735 protein-coding and 53 RNA genes is part of the Genomic Encyclopedia of Bacteria and Archaea project.

Abt, Birte [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany; Foster, Brian [U.S. Department of Energy, Joint Genome Institute; Lapidus, Alla L. [U.S. Department of Energy, Joint Genome Institute; Clum, Alicia [U.S. Department of Energy, Joint Genome Institute; Sun, Hui [U.S. Department of Energy, Joint Genome Institute; Pukall, Rudiger [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany; Lucas, Susan [U.S. Department of Energy, Joint Genome Institute; Glavina Del Rio, Tijana [U.S. Department of Energy, Joint Genome Institute; Nolan, Matt [U.S. Department of Energy, Joint Genome Institute; Tice, Hope [U.S. Department of Energy, Joint Genome Institute; Cheng, Jan-Fang [U.S. Department of Energy, Joint Genome Institute; Pitluck, Sam [U.S. Department of Energy, Joint Genome Institute; Liolios, Konstantinos [U.S. Department of Energy, Joint Genome Institute; Ivanova, N [U.S. Department of Energy, Joint Genome Institute; Mavromatis, K [U.S. Department of Energy, Joint Genome Institute; Ovchinnikova, Galina [U.S. Department of Energy, Joint Genome Institute; Pati, Amrita [U.S. Department of Energy, Joint Genome Institute; Goodwin, Lynne A. [Los Alamos National Laboratory (LANL); Chen, Amy [U.S. Department of Energy, Joint Genome Institute; Palaniappan, Krishna [U.S. Department of Energy, Joint Genome Institute; Land, Miriam L [ORNL; Hauser, Loren John [ORNL; Chang, Yun-Juan [ORNL; Jeffries, Cynthia [Oak Ridge National Laboratory (ORNL); Rohde, Manfred [HZI - Helmholtz Centre for Infection Research, Braunschweig, Germany; Goker, Markus [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany; Woyke, Tanja [U.S. Department of Energy, Joint Genome Institute; Bristow, James [U.S. Department of Energy, Joint Genome Institute; Eisen, Jonathan [U.S. Department of Energy, Joint Genome Institute; Markowitz, Victor [U.S. Department of Energy, Joint Genome Institute; Hugenholtz, Philip [U.S. Department of Energy, Joint Genome Institute; Kyrpides, Nikos C [U.S. Department of Energy, Joint Genome Institute; Klenk, Hans-Peter [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany

2010-01-01T23:59:59.000Z

386

Sandia/DOE geothermal drilling and completion technology development program  

DOE Green Energy (OSTI)

The high cost of drilling and completing geothermal wells is an impediment to the development of geothermal energy resources. Technological deficiencies in rotary drilling techniques are evidenced when drilling geothermal wells. The Division of Geothermal Energy (DGE) of the US Department of Energy (DOE) has initiated a program aimed at developing new drilling and completion techniques for geothermal wells. The goals of this program are to reduce well costs 25% by 1982 and 50% by 1986. Sandia Laboratories has managed this technology development program since October 1977, and this paper presents an overview of the program. A statement of program goals and structure is given. The content of the FY-79 program is presented and recent results of R and D projects are given. Plans for development of an advanced drilling and completion system are discussed.

Barnette, J.H.

1979-01-01T23:59:59.000Z

387

A complete and normalized 61850 substation (Smart Grid Project) | Open  

Open Energy Info (EERE)

complete and normalized 61850 substation (Smart Grid Project) complete and normalized 61850 substation (Smart Grid Project) Jump to: navigation, search Project Name A complete and normalized 61850 substation Country Spain Headquarters Location Madrid, Spain Coordinates 40.488735°, -3.284912° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.488735,"lon":-3.284912,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

388

Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Reduces  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Reduces the Risk along the Columbia River Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Reduces the Risk along the Columbia River September 13, 2012 - 12:00pm Addthis Media Contacts Cameron Salony, DOE Cameron.Salony@rl.doe.gov 509-376-0402 Dee Millikin, CH2M HILL Plateau Remediation Company Dee_Millikin@rl.gov 509-376-1297 RICHLAND, WASH. - The U.S. Department of Energy (DOE) and contractor CH2M HILL Plateau Remediation Company (CH2M HILL) announced today the removal of the first phase of highly radioactive sludge from under water storage in the K West Basin about 400 yards away from the Columbia River. "This is a major step forward in protecting the river and a historic

389

Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Reduces  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Reduces the Risk along the Columbia River Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Reduces the Risk along the Columbia River September 13, 2012 - 12:00pm Addthis Media Contacts Cameron Salony, DOE Cameron.Salony@rl.doe.gov 509-376-0402 Dee Millikin, CH2M HILL Plateau Remediation Company Dee_Millikin@rl.gov 509-376-1297 RICHLAND, WASH. - The U.S. Department of Energy (DOE) and contractor CH2M HILL Plateau Remediation Company (CH2M HILL) announced today the removal of the first phase of highly radioactive sludge from under water storage in the K West Basin about 400 yards away from the Columbia River. "This is a major step forward in protecting the river and a historic

390

LANL completes high-priority flood and erosion control work  

NLE Websites -- All DOE Office Websites (Extended Search)

Lab completes priority erosion controls Lab completes priority erosion controls LANL completes high-priority flood and erosion control work Crews installed 600 feet of water diversion barriers and removed more than 1,200 cubic yards of sediment in anticipation of flash flooding. July 11, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

391

Completion methods in thick, multilayered tight gas sands  

E-Print Network (OSTI)

Tight gas sands, coal-bed methane, and gas shales are commonly called unconventional reservoirs. Tight gas sands (TGS) are often described as formations with an expected average permeability of 0.1mD or less. Gas production rates from TGS reservoirs are usually low due to poor permeability. As such, state-of-the-art technology must be used to economically develop the resource. TGS formations need to be hydraulically fractured in order to enhance the gas production rates. A majority of these reservoirs can be described as thick, multilayered gas systems. Many reservoirs are hundreds of feet thick and some are thousands of feet thick. The technology used to complete and stimulate thick, tight gas reservoirs is quite complex. It is often difficult to determine the optimum completion and stimulating techniques in thick reservoirs. The optimum methods are functions of many parameters, such as depth, pressure, temperature, in-situ stress and the number of layers. In multilayered reservoirs, it is important to include several sand layers in a single completion. The petroleum literature contains information on the various diversion techniques involved in the completion of these multilayered reservoirs. In this research, we have deduced and evaluated eight possible techniques that have been used in the oil and gas industry to divert multilayered fracture treatments in layered reservoirs. We have developed decision charts, economic analyses and computer programs that will assist completion engineers in determining which of the diversion methods are feasible for a given well stimulation. Our computer programs have been tested using case histories from the petroleum literature with results expressed in this thesis. A limited entry design program has also being developed from this research to calculate the fluid distribution into different layers when fracture treating multilayered tight gas reservoirs using the limited entry technique. The research is aimed at providing decision tools which will eventually be input into an expert advisor for well completions in tight gas reservoirs worldwide.

Ogueri, Obinna Stavely

2007-12-01T23:59:59.000Z

392

STEP 1: TO BE COMPLETED BY ALCOHOL TECHNICIAN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 (07/03) OMB Control No. 1910-5122 7 (07/03) OMB Control No. 1910-5122 U.S. Department of Energy (DOE) Human Reliability Program (HRP) Alcohol Testing Form (Instructions for completing this form are attached.) STEP 1: TO BE COMPLETED BY ALCOHOL TECHNICIAN A. Employee Name __________________________________________________________________ (Print) First M.I. Last B. Employee ID No. __________________________________________________________ C. Employer Name __________________________________________________________ _____________________________________(____)________________ HRP Supervisor Phone Number D. Reason for Test: Random Reasonable Susp. Post-Accident Return to Duty Follow-up Pre-employment

393

Complete genome sequence of Acidimicrobium ferrooxidans type strain (ICPT)  

Science Conference Proceedings (OSTI)

Acidimicrobium ferrooxidans (Clark and Norris 1996) is the sole and type species of the genus, which until recently was the only genus within the actinobacterial family Acidimicrobiaceae and in the order Acidomicrobiales. Rapid oxidation of iron pyrite during autotrophic growth in the absence of an enhanced CO2 concentration is characteristic for A. ferrooxidans. Here we describe the features of this organism, together with the complete genome sequence, and annotation. This is the first complete genome sequence of the order Acidomicrobiales, and the 2,158,157 bp long single replicon genome with its 2038 protein coding and 54 RNA genes is part of the Genomic Encyclopedia of Bacteria and Archaea project.

Clum, Alicia; Nolan, Matt; Lang, Elke; Glavina Del Rio, Tijana; Tice, Hope; Copeland, Alex; Cheng, Jan-Fang; Lucas, Susan; Chen, Feng; Bruce, David; Goodwin, Lynne; Pitluck, Sam; Ivanova, Natalia; Mavrommatis, Konstantinos; Mikhailova, Natalia; Pati, Amrita; Chen, Amy; Palaniappan, Krishna; Goker, Markus; Spring, Stefan; Land, Miriam; Hauser, Loren; Chang, Yun-Juan; Jefferies, Cynthia C.; Chain, Patrick; Bristow, James; Eisen, Jonathan A.; Markowitz, Victor; Hugenholtz, Philip; Kyrpides, Nikos C.; Klenk, Hans-Peter; Lapidus, Alla

2009-05-20T23:59:59.000Z

394

Status of NIO1 construction  

SciTech Connect

The NIO1 (Negative Ion Optimization phase 1) project consists of a multiaperture negative ion source mounted on a 60 kV accelerating column; up to 9 beamlets (15 mA H{sup -} each one) arranged in 3x3 matrix with 14 mm spacing can be extracted. The moderate size and the modular concept make some relative rotation of the source magnetic filter and the electrodes possible, so that the effect of crossed and aligned field can be easily compared. Other goals of source experimental program are emittance (and beam profile) measurement at several distances (for simulation code validation), testing of diagnostic components and of radiofrequency coupling. A full set of construction drawing was completed; also the Fast Emittance Scanner (FES) and its vacuum chambers were built (four mounting positions are reserved to FES). Some low power rf matching boxes were developed for a test plasma, approximately half the source size. A cesium oven compatible with NIO1 is being also developed; by using some industrial standard 100 W heaters (with a proper driver) a careful control of temperature is planned.

Cavenago, M.; Fagotti, E.; Poggi, M. [INFN-LNL, v.le dell'Universita' 2, 35020 Legnaro (PD) (Italy); Serianni, G.; Antoni, V.; Bigi, M.; Fellin, F.; Gazza, E.; Recchia, M.; Veltri, P. [Consorzio RFX, Associazione Euratom-ENEA sulla fusione, c.so S. Uniti 4, 35127 Padova (Italy); Petrenko, S.; Kulevoy, T. [INFN-LNL, Legnaro, Italy and ITEP, B. Cheremushkinskaya 25, 117218 Moscow (Russian Federation)

2011-09-26T23:59:59.000Z

395

Current status of ForecastCurrent status of Forecast 2005 EPACT is in the model  

E-Print Network (OSTI)

1 1 Current status of ForecastCurrent status of Forecast 2005 EPACT is in the model 2007 Federal prices are being inputted into the model 2 Sales forecast Select yearsSales forecast Select years --Draft 0.53% Irrigation 2.76% Annual Growth Rates Preliminary Electricity ForecastAnnual Growth Rates

396

Fossil Energy Techline, DOE Completes Large-Scale Carbon  

E-Print Network (OSTI)

and represents a summary of carbon sequestration news covering the past month. Readers are referred to the actual article(s) for complete information. It is produced by the National Energy Technology Laboratory to provide information on recent activities and publications related to carbon sequestration. It covers domestic, international, public sector, and private sector news.

unknown authors

2008-01-01T23:59:59.000Z

397

How is a search system used in work task completion?  

Science Conference Proceedings (OSTI)

Typically studies of information retrieval and interactive information retrieval concentrate on the identification of relevant items. In this study, rather than stop at finding relevant items, we considered how people use a search system in the completion ... Keywords: evaluation, interactive information retrieval, search task, success, work task

Elaine G. Toms, Robert Villa, Lori Mccay-Peet

2013-02-01T23:59:59.000Z

398

Direct decompositions of non-algebraic complete lattices  

E-Print Network (OSTI)

For a given complete lattice L, we investigate whether L can be decomposed as a direct product of directly indecomposable lattices. We prove that this is the case if every element of L is a join of join-irreducible elements and dually, thus extending to non-algebraic lattices a result of L. Libkin. We illustrate this by various examples and counterexamples.

Friedrich Wehrung

2005-01-22T23:59:59.000Z

399

Drilling and Completion of the Urach III HDR Test Well  

DOE Green Energy (OSTI)

The hot dry rock (HDR) test well, urach III, was drilled and completed in 1979. The borehole is located in Southwest Germany in the geothermal anomaly of Urach. The purpose of project Urach was to study drilling and completion problems of HDR wells and to provide a test site for a HDR research program. The Urach III borehole was drilled to a total depth of 3,334 meters (10,939 feet), penetrating 1,700 meters (5,578 feet) into the granitic basement. Extensive coring was required to provide samples for geophysical and geochemical studies. Positive displacement downhole motors were used for coring and normal drilling operations. It was found that these motors in combination with the proper bits gave better results than conventional rotary drilling. Loss of circulation was encountered not only in sedimentary rocks but also in the granite. After drilling and completion of the borehole, a number of hydraulic fracturing experiments were performed in the open hole as well as in the cased section of Urach III. A circulation loop was established by using the single-borehole concept. It is not yet clear whether new fractures have actually been generated or preexisting joints and fissures have been reactivated. Evaluation of the results of this first step is almost completed and the planning of Phase II of the Urach project is under way.

Meier, U.; Ernst, P. L.

1981-01-01T23:59:59.000Z

400

Tight gas sands study breaks down drilling and completion costs  

Science Conference Proceedings (OSTI)

Given the high cost to drill and complete tight gas sand wells, advances in drilling and completion technology that result in even modest cost savings to the producer have the potential to generate tremendous savings for the natural gas industry. The Gas Research Institute sponsored a study to evaluate drilling and completion costs in selected tight gas sands. The objective of the study was to identify major expenditures associated with tight gas sand development and determine their relative significance. A substantial sample of well cost data was collected for the study. Individual well cost data were collected from nearly 300 wells in three major tight gas sand formations: the Cotton Valley sand in East Texas, the Frontier sand in Wyoming, and the Wilcox sand in South Texas. The data were collected and organized by cost category for each formation. After the information was input into a data base, a simple statistical analysis was performed. The statistical analysis identified data discrepancies that were then resolved, and it helped allow conclusions to be drawn regarding drilling and completion costs in these tight sand formations. Results are presented.

Brunsman, B. (Gas Research Inst., Chicago, IL (United States)); Saunders, B. (S.A. Holditch Associates Inc., College Station, TX (United States))

1994-06-06T23:59:59.000Z

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

NEXP TIME-complete description logics with concrete domains  

Science Conference Proceedings (OSTI)

Concrete domains are an extension of Description Logics (DLs) that allow one to integrate reasoning about conceptual knowledge with reasoning about "concrete qualities" of real-world entities such as their sizes, weights, and durations. In this article, ... Keywords: Computational complexity, NExpTime-completeness, concrete domains, description logic, domino problem, post correspondence problem

Carsten Lutz

2004-10-01T23:59:59.000Z

402

Complete Genome of the Cellulolytic Ruminal Bacterium Ruminococcus albus 7  

SciTech Connect

Ruminococcus albus 7 is a highly cellulolytic ruminal bacterium that is a member of the phylum Firmicutes. Here, we describe the complete genome of this microbe. This genome will be useful for rumen microbiology and cellulosome biology and in biofuel production, as one of its major fermentation products is ethanol.

Suen, Garret [University of Wisconsin, Madison; Stevenson, David M [USDA-ARS, Madison WI; Bruce, David [Los Alamos National Laboratory (LANL); Chertkov, Olga [Los Alamos National Laboratory (LANL); Copeland, A [U.S. Department of Energy, Joint Genome Institute; Cheng, Jan-Fang [U.S. Department of Energy, Joint Genome Institute; Detter, J. Chris [U.S. Department of Energy, Joint Genome Institute; Goodwin, Lynne A. [Los Alamos National Laboratory (LANL); Han, Cliff [Los Alamos National Laboratory (LANL); Hauser, Loren John [ORNL; Ivanova, N [U.S. Department of Energy, Joint Genome Institute; Kyrpides, Nikos C [U.S. Department of Energy, Joint Genome Institute; Land, Miriam L [ORNL; Lapidus, Alla L. [U.S. Department of Energy, Joint Genome Institute; Lucas, Susan [U.S. Department of Energy, Joint Genome Institute; Ovchinnikova, Galina [U.S. Department of Energy, Joint Genome Institute; Pitluck, Sam [U.S. Department of Energy, Joint Genome Institute; Tapia, Roxanne [Los Alamos National Laboratory (LANL); Woyke, Tanja [U.S. Department of Energy, Joint Genome Institute; Boyum, Julie [University of Wisconsin, Madison; Mead, David [University of Wisconsin, Madison; Weimer, Paul J [USDA-ARS, Madison WI

2011-01-01T23:59:59.000Z

403

Landscape Environmental Monitoring: Sample Based Versus Complete Mapping  

E-Print Network (OSTI)

13 Landscape Environmental Monitoring: Sample Based Versus Complete Mapping Approaches in Aerial for this purpose. In mapping, homogenous areas are first delineated as polygons. Aerial photo interpretation and Traub, 2003). The argument is that a sample survey takes less time; that it is possible to achieve more

404

The relationship between minority statuses and prejudice  

E-Print Network (OSTI)

It is important to explore prejudice to understand and learn how to decrease it. There is a central belief that personal knowledge reduces prejudice. Does a person who has personal knowledge of prejudice, for example, those of minority status have less prejudice towards others? There has been considerable research on the prejudice that the majority might feel towards minorities but there is limited research on minorities prejudice towards others. The current study focuses on the relationship between a person of self-perceived minority statuses and her or his feelings of prejudice towards others (e.g. minorities and mainstream). Previous research had found a positive correlation between fundamentalism and prejudice. This study investigated that relationship and a positive correlation was found. Another aspect that has been studied in previous research, dealing with prejudice and self reports, is social desirability. This study investigated the relationship between social desirability and multiple minority statuses and no statistical significance was found. An analysis of variance (ANOVA) was utilized to investigate the relationship between multiple minority statuses and prejudice. The analysis showed no statistical significance on the relationship between multiple minority statuses and prejudice. There is still a lot about prejudice that remains unknown. This area of research should be investigated further to better understand minority prejudice, which in turn might lead us to overcome its negative effects.

Veve, Mia

2007-08-01T23:59:59.000Z

405

Alternative calcination development status report  

SciTech Connect

The Programmatic Spent Nuclear Fuel and (INEEL) Environmental Restoration and Waste Management Programs Environmental Impact Statement Record of Decision, dated June 1, 1995, specifies that high-level waste stored in the underground tanks at the ICPP continue to be calcined while other options to treat the waste are studied. Therefore, the High-Level Waste Program has funded a program to develop new flowsheets to increase the liquid waste processing rate. Simultaneously, a radionuclide separation process, as well as other options, are also being developed, which will be compared to the calcination treatment option. Two alternatives emerged as viable candidates; (1) elevated temperature calcination (also referred to as high temperature calcination), and (2) sugar-additive calcination. Both alternatives were determined to be viable through testing performed in a lab-scale calcination mockup. Subsequently, 10-cm Calciner Pilot Plant scoping tests were successfully completed for both flowsheets. The results were compared to the standard 500 C, high-ANN flow sheet (baseline flowsheet). The product and effluent streams were characterized to help elucidate the process chemistry and to investigate potential environmental permitting issues. Several supplementary tests were conducted to gain a better understanding of fine-particles generation, calcine hydration, scrub foaming, feed makeup procedures, sugar/organic elimination, and safety-related issues. Many of the experiments are only considered to be scoping tests, and follow-up experiments will be required to establish a more definitive understanding of the flowsheets. However, the combined results support the general conclusion that flowsheet improvements for the NWCF are technically viable.

Boardman, R.D.

1997-12-01T23:59:59.000Z

406

National Ignition Facility monthly status report-January 2000  

SciTech Connect

The Project provides for the design, procurement, construction, assembly, installation, and acceptance testing of the National Ignition Facility (NIF), an experimental inertial confinement fusion facility intended to achieve controlled thermonuclear fusion in the laboratory by imploding a small capsule containing a mixture of the hydrogen isotopes deuterium and tritium. The NIF will be constructed at the Lawrence Livermore National Laboratory (LLNL), Livermore, California as determined by the Record of Decision made on December 19, 1996, as a part of the Stockpile Stewardship and Management Programmatic Environmental Impact Statement. Safety: On January 13, 2000, a worker received a back injury when a 42-in.-diameter duct fell during installation. He was taken by helicopter to the hospital and released on January 16, 2000. All work in the area was suspended, and the construction contractors went through a thorough safety review before work was started. A DOE occurrence report was filed. An independent LLNL Incident Analysis Team is reviewing the cause of the accident and will report out on March 1. A Project management review team is reviewing construction line management and safety support and will also report out on March 1. Several changes in work planning and site management have been incorporated to increase site safety. Technical Status: The general status of the technologies underlying the NIF Project remains satisfactory. The issues currently being addressed are (1) cleanliness for installation, assembly, and activation of the laser system by Systems Engineering; (2) laser glass--a second pilot run at one of the two commercial suppliers is ongoing; and (3) operational costs associated with final optics assembly (FOA) optics components--methods are being developed to mitigate 3 {omega}damage and resolve beam rotation issues. Schedule: The completion of the Title II design of laser equipment is now approximately 80% complete. The Beampath Infrastructure System is on the critical schedule path. The procurement strategy is being evaluated by commercial construction management and Architectural/Engineering (A/E) contractors with a report presented to a panel of independent experts, the Beampath Infrastructure System Implementation Review Committee Advisory Group who wrote a set of recommendations for proceeding with this critical path activity. In January, a briefing was given to DOE Oakland (OAK) Field Manager who then arranged briefings for the DOE OAK Procurement organization with the LLNL Procurement organization to review the proposed procurement strategies. The next step is to review the strategy with DOE Headquarters (HQ) procurement. The construction status of the Conventional Facilities at the end of January is 83% complete and is projected to finish within budget and on schedule. Cost: The NIF Project Total Project Cost (TPC) is $1.2B. The Project has obligated 73% of the TPC funds. The remaining contingency is $21.8M. Because of schedule delays and projected increases in the design, construction management, assembly, and installation of the system infrastructure, cost growth of the TPC is anticipated and will remain a major concern until the budget rebaseline process is completed.

Moses, E

2000-01-31T23:59:59.000Z

407

ARM - Value-Added Product Status Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Status Reports Status Reports Publications Journal Articles Conference Documents Program Documents Technical Reports Publications Database Public Information Materials Image Library Videos Publication Resources Submit a Publication Publishing Procedures ARM Style Guide (PDF, 448KB) Acronyms Glossary Logos Contacts RSS for Publications Value-Added Product Status Reports ARM Climate Research Facility Quarterly Value-Added Product Report July 1-September 30, 2013 (PDF, 1MB) ARM Climate Research Facility Quarterly Value-Added Product Report April 1-June 30, 2013 (PDF, 1MB) ARM Climate Research Facility Quarterly Value-Added Product Report January 1-March 31, 2013 (PDF, 268KB) ARM Climate Research Facility Quarterly Value-Added Product Report October 1-December 31, 2012 (PDF, 271KB) ARM Climate Research Facility Quarterly Value-Added Product Report

408

Renewables in India : Status and Future Potential  

NLE Websites -- All DOE Office Websites (Extended Search)

Renewables in India : Status and Future Potential Renewables in India : Status and Future Potential Speaker(s): Luis Fernandes Date: July 9, 2007 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Galen Barbose We analyse the status and the trends in the growth of renewables in India. We propose a methodology linking micro-simulation to macro-modelling to obtain technical and economic potential estimates for solar water heaters in residential and commercial and biomass gasifiers for thermal applications in industry. We assess the sustainability of renewables based on the criteria of life cycle cost, net energy ratio, resource constraint and greenhouse gas emissions. The renewable based technologies seem to be sustainable based on all criteria, except the high life cycle cost. In some cases e.g. in wind and biomass based systems land availability may

409

Lab Status via Twitter | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Lab Status via Twitter Lab Status via Twitter Employees can be notified of changes to the laboratory's operations - for example, a delayed opening due to a heavy overnight snowfall - via the "Argonnestatus" account on Twitter. The account can be set to automatically send text messages to most mobile phones and PDAs. In addition to a short description of any changes in laboratory operations, messages may contain links to additional, detailed information. Only messages about changes in laboratory business hours will be sent. Most mobile communication devices can receive Twitter updates; instructions for receiving Argonne Status updates by phone are below. Any applicable text messaging charges from your provider are your responsibility. The Twitter Web site has basic information about the free online service.

410

ORISE: Voluntary Protection Program (VPP) Star Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Voluntary Protection Program (VPP) Star Status Voluntary Protection Program (VPP) Star Status Within the U.S. Department of Energy's (DOE) Voluntary Protection Program (VPP), there are three levels of recognition: STAR, MERIT and DEMONSTRATION. Contractors' programs that meet the requirements for outstanding safety and health programs, earn VPP STAR status-the highest achievement level. In December of 2003, the Oak Ridge Institute for Science and Education (ORISE) first earned STAR distinction following a comprehensive evaluation of its application for the VPP program. At that time, ORISE was just the 21st DOE site and the first in Tennessee to earn such exemplary recognition. In 2011 ORISE received its seventh consecutive Star of Excellence award. Today, ORISE is one of more than two dozen DOE sites to achieve VPP STAR

411

UTSI/CFFF MHD PROGRAM COMPLETION AND RELATED ACTIVITY  

Science Conference Proceedings (OSTI)

In this final technical report, UTSI summarizes work completed under DOE Contract No. DE-AC22-95PC95231. This work began on the contract effective date, September 15, 1995 and is continuing on a very small basis to complete the groundwater remediation as of this date. The work scope required UTSI to continue to maintain the DOE Coal Fired Flow Facility and keep it in readiness for anticipated testing. This effort was terminated in September 1998 by DOE stop-work letter. Work continued on reporting, environmental restoration and on the High Temperature Superconductivity work that was underway. The work included preparing reports on the MHD POC tests that had been completed just prior to this contract initiation under an earlier contract with DOE Chicago. These four reports are summarized herein. This report summarizes the environmental restoration work performed under the contract, including groundwater monitoring and remediation, removal of wastes from the facility, removal of asbestos from the cooling tower and actions in compliance with the license to discharge water into Woods Reservoir. This report covers work in support of the DOE High Temperature Superconductivity program including: (1) Assistance to DOE in preparing a development plan; (2) Cooperation with industry, national laboratories and other universities to promote the commercialization of thin film superconductors (coated conductors); (3) Process Evaluations; (4) Process Diagnostic Development; and (5) Process Economics. The assistance to DOE task included convening an advisory board composed of all the major participants in the DOE program and preparing a draft development plan and Research and Development Roadmap leading to commercialization of the coated conductor technology. Under this program, cooperative agreements and cooperative work was undertaken with Oak Ridge National Laboratory, Midwest Superconductivity, Inc., EURUS Technologies, Inc., Westinghouse Electric Company, and others. In the process evaluation task, four studies were completed by faculty, staff and students. Summaries of these studies are included in this report. In process diagnostic development, three studies were completed, all emphasizing diagnostics that are applicable to real time control of manufacturing processes. In Process Economics, one study was completed that estimated the manufacturing cost of superconducting wire produced by two of the process thought to be most promising.

Joel W. Muehlhauser

2004-07-21T23:59:59.000Z

412

What is the status of the Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

status of the Project? status of the Project? The first phase of the project was energized on July 20, 2006. It operated flawlessly as an integral part of National Grid's 35-kilovolt network in Albany, serving the equivalent of 25,000 homes. It was taken offline after nine months to begin phase II of the project: replacing a 30-meter section with 2G cable, which will be the world's first use of 2G in any utility device. Phase II of the project was energized on January 8, 2008.

413

Environment and safety research status report: 1993  

SciTech Connect

The 1993 status report discusses ongoing and planned research activities in the GRI Environment and Safety Program. The objectives and goals, accomplishments, and strategy along with the basis for each project area are presented for the supply, end use, and gas operations subprograms. Within the context of these subprograms, contract status summaries under their conceptual titles are given for the following project areas: Gas Supply Environmental and Safety Research, Air Quality Research, End Use Equipment Safety Research, Gas Operations Safety Research, Liquefied Natural Gas, Safety Research, and Gas Operations Environmental Research.

Not Available

1993-03-01T23:59:59.000Z

414

Agencies complete comprehensive investigation for radioactive and hazardous  

NLE Websites -- All DOE Office Websites (Extended Search)

Printer-friendly icon Printer-Friendly June 29, 2007 Agencies complete comprehensive investigation for radioactive and hazardous waste landfill; agree to extend document submittal milestone The U.S. Department of Energy (DOE), Idaho Department of Environmental Quality (IDEQ), and U.S. Environmental Protection Agency (EPA) have completed a CERCLA (Superfund) Remedial Investigation and Baseline Risk Assessment and Feasibility Study of a radioactive and hazardous waste landfill at the U.S. Department of Energy�s Idaho Radioactive Waste Management Complex (RWMC). The results of these investigations are found in two documents: the Remedial Investigation and Baseline Risk Assessment for Operable Unit 7-13/-14 and the Feasibility Study for Operable Unit 7-13/-14. Both documents are available in the Administrative Record at http://ar.inel.gov/. The documents are also available at the INL Technical Library in Idaho Falls and Boise State University�s Albertsons Library.

415

GUIDANCE TO COMPLETING THE SELF-DIRECTED RBSM INTERVIEW FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TO COMPLETING THE SELF-DIRECTED RBSM TO COMPLETING THE SELF-DIRECTED RBSM INTERVIEW FORM The RBSM Process This guidance package is meant to be a companion piece for the self-directed RBSM Interview Form and describes the basic mechanics of the RBSM process. Examples are provided to clarify the review process and provide the reviewer with some of the rationale behind the questions that are asked. This companion piece does not emulate the exact order of the review process interview form but rather, attempts to address the major pathways that may be followed along the way to selecting a given disposition category. The RBSM review process is outlined in a detailed flow chart which is subdivided into various sections. The first section of the flow chart initially identifies the activity to be evaluated. The remaining sections include a

416

Complete oxidation of methane on palladium catalysts. Final Report  

DOE Green Energy (OSTI)

This is the final report for grant DE-FG02-00ER15026. It summarizes all the accomplishments in these 8 sections: (1) Adaptations on Existing Unit and Construction of New Unit; (2) Turnover Rate and Reaction Orders for the Complete Oxidation of Methane on a Palladium Foil in Excess Dioxygen; (3) Surface area increase on Pd foils after oxidation in excess methane; (4) UV Raman spectroscopic study of hydrogen bonding in gibbsite and bayerite between 93 and 453 K; (5) Coverage of Palladium Catalysts by Oxidized Silicon During Complete Oxidation of Methane; (6) Kinetics of Methane Oxidation under lean conditions over Pd and PdO; (7) An Explanation for the Hysteresis on the Oxidation of Methane; and (8) Structure of Pd(111) after oxidation in O{sub 2}.

Ribeiro, Fabio H.

2003-07-17T23:59:59.000Z

417

All Complete Intersection Calabi-Yau Four-Folds  

E-Print Network (OSTI)

We present an exhaustive, constructive, classification of the Calabi-Yau four-folds which can be described as complete intersections in products of projective spaces. A comprehensive list of 921,497 configuration matrices which represent all topologically distinct types of complete intersection Calabi-Yau four-folds is provided and can be downloaded at http://www-thphys.physics.ox.ac.uk/projects/CalabiYau/Cicy4folds/index.html . The manifolds have non-negative Euler characteristics in the range 0 - 2610. This data set will be of use in a wide range of physical and mathematical applications. Nearly all of these four-folds are elliptically fibered and are thus of interest for F-theory model building.

James Gray; Alexander S. Haupt; Andre Lukas

2013-03-07T23:59:59.000Z

418

Frac packs: A specialty option or primary completion technique?  

SciTech Connect

High permeability fracture treatments have taken place at Alaska`s North Slope, in the North Sea, and most recently, in the unconsolidated Miocene formations of the Gulf of Mexico -- where gravel pack completions have historically been used to prevent sand production. In the Gulf of Mexico, attempts were made as early as the mid-1960s to hydraulically fracture sands. However, some of these early treatments failed because of improper techniques, poor candidate selection and lack of understanding of rock property mechanics. Recent developments in fracturing technology, and the use of this technology to fracture through damage has achieved more favorable results than gravel packing and sandstone acidizing, and has led to widespread use of these fracture treatments. The procedure for fracturing high permeability formations is called frac packing. These frac pack treatments are typically used to remove near-wellbore damage that occurs from drilling and completion operations.

NONE

1997-03-01T23:59:59.000Z

419

DOE Joint Genome Institute: Scientists Publish Complete Genetic Blueprint  

NLE Websites -- All DOE Office Websites (Extended Search)

January 28, 2009 January 28, 2009 Scientists Publish Complete Genetic Blueprint of Key Biofuels Crop WALNUT CREEK, CA-Scientists at the U.S. Department of Energy (DOE) Joint Genome Institute (JGI) and several partner institutions have published the sequence and analysis of the complete genome of sorghum, a major food and fodder plant with high potential as a bioenergy crop. The genome data will aid scientists in optimizing sorghum and other crops not only for food and fodder use, but also for biofuels production. The comparative analysis of the sorghum genome appears in the January 29 edition of the journal Nature. Prized for its drought resistance and high productivity, sorghum is currently the second most prevalent biofuels crop in the United States, behind corn. Grain sorghum produces the same amount of ethanol per bushel

420

DOE Joint Genome Institute Completes Soybean Genome- Data Released to  

NLE Websites -- All DOE Office Websites (Extended Search)

Press Release: December 8, 2008 Press Release: December 8, 2008 DOE Joint Genome Institute Completes Soybean Genome- Data Released to Advance Biofuel, Food, & Feed Research WALNUT CREEK, CA- The U.S. Department of Energy Joint Genome Institute (DOE JGI) has released a complete draft assembly of the soybean (Glycine max) genetic code, making it widely available to the research community to advance new breeding strategies for one of the world's most valuable plant commodities. Soybean not only accounts for 70 percent of the world's edible protein, but also is an emerging feedstock for biodiesel production. Soybean is second only to corn as an agricultural commodity and is the leading U.S. agricultural export. DOE JGI's interest in sequencing the soybean centers on its use for biodiesel, a renewable, alternative fuel with the highest energy content of

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

ORISE: Completion of environmental characterization at ORNL a Recovery Act  

NLE Websites -- All DOE Office Websites (Extended Search)

ORISE's completion of environmental characterization at ORNL is a ORISE's completion of environmental characterization at ORNL is a Recovery Act success Exterior of K-33 superstructure at ORNL This 2.8 million-square-foot facility known as K-33 was formerly used to house a uranium-enrichment operation during the Manhattan Project. The superstructure was one of three dozen facilities ORISE characterized under the American Recovery and Reinvestment Act-an effort that proved to be challenging due to the complexity of the facilities and the project's accelerated timeline. Photo courtesy of DOE. Over the past year and a half, funding from the American Recovery and Reinvestment Act (ARRA) has made its way into Oak Ridge, Tenn. That has meant that the Oak Ridge Institute for Science and Education (ORISE), which is managed by Oak Ridge Associated Universities, has been very busy

422

NETL: News Release - DOE, Jacksonville Utility Complete Major Clean Coal  

NLE Websites -- All DOE Office Websites (Extended Search)

August 2, 2005 August 2, 2005 DOE, Jacksonville Utility Complete Major Clean Coal Technology Project Eight Year Demonstration Project Results in One of World's Cleanest Coal-Based Power Plants WASHINGTON, DC - The U.S. Department of Energy and JEA, the public utility of Florida, have achieved a significant milestone in the DOE's Clean Coal Technology Demonstration Program by completing a project in which JEA's Northside Generating Station was converted into one of the cleanest burning coal-fired power plants in the world. MORE INFO Read the final project report [PDF-438KB] As part of the 8-year, $320 million cost-shared project, JEA installed state-of-the-art technology known as circulating fluidized bed combustion in a 300?megawatt combustor-triple the size of any previous

423

Recovery Act Workers Complete Environmental Cleanup of Coal Ash Basin  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site (SRS) recently cleaned up a 17- Site (SRS) recently cleaned up a 17- acre basin containing coal ash residues from Cold War operations. The American Recovery and Reinvestment Act project was safely completed at a cost of $8.9 million, $2.9 million under budget. The manmade earthen basin received ash from the former R Area Pow- erhouse operations, which ended in 1964. The first of five reactors con- structed at SRS, the R Reactor produced nuclear materials for national defense. Recovery Act funding allowed SRS to accelerate cleanup of the basin and complete the project five years earlier than the target set in a regu- latory schedule. In late 2010, the U.S. Environmental Protection Agency and South Carolina Department of Health and Environmental Control determined the closure met all regulatory requirements after inspection

424

Retrievable exploration guide base/completion guide base system  

SciTech Connect

A system is described for converting a subsea exploratory well into a production well. The well includes a temporary guide base located subsea with guide lines extending to the water surface and a central opening through which drilling operations are conducted. A method of converting a subsea exploratory well into a production well is described comprising the steps of: locating a temporary guide base on a subsea mud line, providing a permanent guide base in two parts latched together, providing a wellhead housing with an external latching profile and assembling the two parts of the permanent guide base and the wellhead housing together and lowering the assembly onto the temporary guide base, releasing part of the permanent guide base leaving the second part of the permanent guide base and the wellhead housing subsea, providing a completion guide base with equipment for producing from the well and lowering the completion guide base on to the temporary guide base.

Hed, J.E.; Draper, R.B.

1986-09-16T23:59:59.000Z

425

Age-aware solder performance models : level 2 milestone completion.  

Science Conference Proceedings (OSTI)

Legislated requirements and industry standards are replacing eutectic lead-tin (Pb-Sn) solders with lead-free (Pb-free) solders in future component designs and in replacements and retrofits. Since Pb-free solders have not yet seen service for long periods, their long-term behavior is poorly characterized. Because understanding the reliability of Pb-free solders is critical to supporting the next generation of circuit board designs, it is imperative that we develop, validate and exercise a solder lifetime model that can capture the thermomechanical response of Pb-free solder joints in stockpile components. To this end, an ASC Level 2 milestone was identified for fiscal year 2010: Milestone 3605: Utilize experimentally validated constitutive model for lead-free solder to simulate aging and reliability of solder joints in stockpile components. This report documents the completion of this milestone, including evidence that the milestone completion criteria were met and a summary of the milestone Program Review.

Neilsen, Michael K.; Vianco, Paul Thomas; Neidigk, Matthew Aaron; Holm, Elizabeth Ann

2010-09-01T23:59:59.000Z

426

SRS Recovery Act Completes Major Lower Three Runs Project Cleanup  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 14, 2012 August 14, 2012 AIKEN, S.C. - American Recovery and Reinvestment Act can now claim that 85 percent of the Savannah River Site (SRS) has been cleaned up with the recent completion of the Lower Three Runs (stream) Project. Twenty miles long, Lower Three Runs leaves the main body of the 310-square mile site and runs through parts of Barnwell and Allendale Coun- ties until it flows into the Savannah River. Government property on both sides of the stream acts as a buffer as it runs through privately-owned property. Completing this project reduces the site's footprint by another 10 percent. "We excavated and disposed of over five million pounds of contaminated soil from three specific sites along the stream, erected miles of fence and placed over 2,000 signs in order to make Lower Three Runs safe and to reduce our site's footprint by another 10 percent," said Chris

427

Pseudo 3-D simulator optimizes gravel-packed completions  

SciTech Connect

This paper discusses a three-dimensional computer simulation which allows the consistent use of a gravel pack in oil and gas well completions. The primary thrust of the paper is dealing with horizontal oil and gas wells in unconsolidated reservoir rock. The model's objective is to provide an overall computer-aided design and evaluation tool for circulation and squeeze gravel packing. It is based on equations representing conservation of mass, momentum, and energy.

Ali, S.A.; Sanclemente, L.W. (Chevron USA Production Co., New Orleans, LA (United States)); Tupper, M.A. (Dowell, New Orleans, LA (United States))

1994-03-01T23:59:59.000Z

428

2010sr27[cooling_tower_complete].doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Friday, September 17, 2010 Friday, September 17, 2010 james-r.giusti@srs.gov Paivi Nettamo, SRNS, (803) 952-6938 paivi.nettamo@srs.gov K Cooling Tower Project Reaches Completion Aiken, S.C. - One of the most visual milestones of cleanup projects underway within the Department of Energy's Office of Environmental Management was the demolition of the K-Reactor Cooling Tower at the Savannah River Site (SRS). Now, this American Recovery and Reinvestment Act project has been

429

Dynamical probability, particle trajectories and completion of traditional quantum mechanics  

E-Print Network (OSTI)

Maintaining the position that the wave function $\\psi$ provides a complete description of state, the traditional formalism of quantum mechanics is augmented by introducing continuous trajectories for particles which are sample paths of a stochastic process determined (including the underlying probability space) by $\\psi$. In the resulting formalism, problems relating to measurements and objective reality are solved as in Bohmian mechanics (without sharing its weak points). The pitfalls of Nelson's stochastic mechanics are also avoided.

Tulsi Dass

2005-05-25T23:59:59.000Z

430

Downhole Power Generation and Wireless Communications for Intelligent Completions Applications  

SciTech Connect

Tubel Tech has been working with the DoE Rocky Mountain test center to create a CRADA which will allow Tubel Tech to test its wireless gauge in a well at the test center. The CRADA agreement should be completed by the next quarter and Tubel Tech expects to perform the final test on this project during the next quarter as well. The wireless gauge has not been modified or upgraded during this report period.

Paul Tubel

2005-11-07T23:59:59.000Z

431

Time Series, Stochastic Processes and Completeness of Quantum Theory  

Science Conference Proceedings (OSTI)

Most of physical experiments are usually described as repeated measurements of some random variables. Experimental data registered by on?line computers form time series of outcomes. The frequencies of different outcomes are compared with the probabilities provided by the algorithms of quantum theory (QT). In spite of statistical predictions of QT a claim was made that it provided the most complete description of the data and of the underlying physical phenomena. This claim could be easily rejected if some fine structures

2011-01-01T23:59:59.000Z

432

Development of geothermal-well-completion systems. Final report  

DOE Green Energy (OSTI)

Results of a three year study concerning the completion of geothermal wells, specifically cementing, are reported. The research involved some specific tasks: (1) determination of properties an adequate geothermal well cement must possess; (2) thorough evaluation of current high temperature oilwell cementing technology in a geothermal context; (3) basic research concerning the chemical and physical behavior of cements in a geothermal environment; (4) recommendation of specific cement systems suitable for use in a geothermal well.

Nelson, E.B.

1979-01-01T23:59:59.000Z

433

Augmented Fish Health Monitoring; Volume II of II, Completion Report.  

DOE Green Energy (OSTI)

The Bonneville Power Administration (BPA) initiated the Augmented Fish Health Monitoring project in 1986. This project was a five year interagency project involving fish rearing agencies in the Columbia Basin. Participating agencies included: Washington Department of Fisheries (WDF), Oregon Department of Fish and Wildlife, Idaho Department of Fish and Game, and the US Fish and Wildlife Service (USFWS). This is the final data report for the Augmented Fish Health Monitoring project. Data collected and sampling results for 1990 and 1991 are presented within this report. An evaluation of this project can be found in Augmented Fish Health Monitoring, Volume 1, Completion Report.'' May, 1991. Pathogen detection methods remained the same from methods described in Augmented Fish Health Monitoring, Annual Report 1989,'' May, 1990. From January 1, 1990 to June 30, 1991 fish health monitoring sampling was conducted. In 1990 21 returning adult stocks were sampled. Juvenile pre-release exams were completed on 20 yearling releases, and 13 sub-yearling releases in 1990. In 1991 17 yearling releases and 11 sub-yearling releases were examined. Midterm sampling was completed on 19 stocks in 1990. Organosomatic analysis was performed at release on index station stocks; Cowlitz spring and fall chinook, Lewis river early coho and Lyons Ferry fall chinook.

Michak, Patty

1991-12-01T23:59:59.000Z

434

Coiled tubing enables rapid CO{sub 2} completions  

Science Conference Proceedings (OSTI)

In the Bravo Dome field of northeastern New Mexico, Amoco has doubled their expected carbon dioxide (CO{sub 2}) production and reduced completion costs by 7.5% using coiled tubing in conjunction with other technologies. Amoco initially expected to produce an average 2.6 MMcfd per well. Instead, six months after completing the 31-well package, the company is producing an average 5.1 MMcfd. Important elements contributing cost and time savings on the project were: Log analysis to select perforations and help prevent water production, and lost circulation; the mobility and flexibility of coiled tubing; using cement for low-cost lost circulation control; using thermoplastic film to prevent proppant flowback; fracture designs optimized for each well; and forming an alliance between Amoco and vendors and developing of mutual trust. Amoco and other producing companies use about 95% of the CO{sub 2} produced at Amoco`s Bravo Dome field for enhanced oil recovery (EOR) projects in the Permian Basin area. Amoco sells 5% of the purest product to companies in the US food industry. While the low price of CO{sub 2}, about one-fourth that of methane, furnished part of the impetus for Amoco to implement the cost-cutting methods at Bravo Dome, the methods can be applied in many completion applications and are discussed in this paper.

Payton, R.; Baker, R.; Turner, D.; Bertrand, B.

1996-08-01T23:59:59.000Z

435

Geopressured geothermal drilling and completions technology development needs  

DOE Green Energy (OSTI)

Geopressured geothermal formations found in the Texas and Louisiana gulf coast region and elsewhere have the potential to supply large quantities of energy in the form of natural gas and warm brine (200 to 300/sup 0/F). Advances are needed, however, in hardware technology, well design technology, and drilling and completion practices to enable production and testing of exploratory wells and to enable economic production of the resource should further development be warranted. This report identifies needed technology for drilling and completing geopressured geothermal source and reinjection wells to reduce the cost and to accelerate commercial recovery of this resource. A comprehensive prioritized list of tasks to develop necessary technology has been prepared. Tasks listed in this report address a wide range of technology needs including new diagnostic techniques, control technologies, hardware, instrumentation, operational procedure guidelines and further research to define failure modes and control techniques. Tasks are organized into the functional areas of well design, drilling, casing installation, cementing, completions, logging, brine reinjection and workovers.

Maish, A.B.

1981-03-01T23:59:59.000Z

436

Indonesia and Climate Change: Current Status and Policies | Open Energy  

Open Energy Info (EERE)

and Climate Change: Current Status and Policies and Climate Change: Current Status and Policies Jump to: navigation, search Name Indonesia and Climate Change: Current Status and Policies Agency/Company /Organization World Bank, Department for International Development Indonesia Sector Energy, Land Focus Area Renewable Energy, Forestry, Agriculture Topics Policies/deployment programs, Background analysis Resource Type Publications Website http://siteresources.worldbank Country Indonesia South-Eastern Asia References Indonesia and Climate Change: Current Status and Policies[1] Background References ↑ "Indonesia and Climate Change: Current Status and Policies" Retrieved from "http://en.openei.org/w/index.php?title=Indonesia_and_Climate_Change:_Current_Status_and_Policies&oldid=328842

437

Status of the NRC Decommissioning Program  

Science Conference Proceedings (OSTI)

On July 21, 1997, the U.S. Nuclear Regulatory Commission (NRC) published the final rule on Radiological Criteria for License Termination (the License Termination Rule or LTR) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submit Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program that was presented during WM'02. It discusses the staff's current efforts to streamline the decommissioning process, current issues being faced in the decommissioning program, such as partial site release and restricted release of sites, as well as the status of the decommissioning of complex sites and those listed in the Site Decommissioning Management Plan. The paper discusses the status of permanently shut-down commercial power reactors and the transfer of complex decommissioning sites and sites listed on the SDMP to Agreement States. Finally the paper provides an update of the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including an effort to consolidate and risk-inform decommissioning guidance.

Orlando, D. A.; Camper, L.; Buckley, J.; Pogue, E.; Banovac, K.

2003-02-24T23:59:59.000Z

438

CDF Status and B Physics Prospects  

Science Conference Proceedings (OSTI)

With extensive upgrades to the detector and electronics, CDF has started collecting data with Run II of the Tevatron. The enhanced silicon coverage and the use of silicon based tracks in the trigger, make CDF well suited for a broad program of B hadron measurements. We present the current status of the experiment and prospects for measurements in Run II.

J. Stephen Miller

2002-10-07T23:59:59.000Z

439

The National Storage Laboratory: Overview and status  

Science Conference Proceedings (OSTI)

The National Storage Laboratory (NSL) was organized to investigate, demonstrate, and commercialize high-performance hardware and software storage technologies that promise to remove network computing bottlenecks and provide critically needed new storage systems functionality. This paper briefly outlines the goals, collaboration and current status of the NSL.

Watson, R.W.; Coyne, R.

1994-01-19T23:59:59.000Z

440

Status of IFR fuel cycle demonstration  

SciTech Connect

The next major step in Argonne`s Integral Fast Reactor (IFR) Program is demonstration of the pyroprocess fuel cycle, in conjunction with continued operation of EBR-II. The Fuel Cycle Facility (FCF) is being readied for this mission. This paper will address the status of facility systems and process equipment, the initial startup experience, and plans for the demonstration program.

Lineberry, M.J.; Phipps, R.D.; McFarlane, H.F.

1993-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Fuel Cell Technology Status - Voltage Degradation (Presentation)  

DOE Green Energy (OSTI)

This presentation describes an independent assessment of fuel cell durability status and discusses the project's relevance to the Department of Energy Hydrogen and Fuel Cells Program; NREL's analysis approach; the FY12 technical accomplishments including the fourth annual publication of results; and project collaborations and future work.

Kurtz, J.; Wipke,; Sprik, S.; Saur, G.

2012-06-01T23:59:59.000Z

442

Solar Photovoltaics development -Status and perspectives  

E-Print Network (OSTI)

Solar Photovoltaics development - Status and perspectives Jørgen Fenhann Risø National Laboratory for the development of solar photovoltaics, contributing to the Macro Task E1 on production cost for fusion.S. with 53 MWp followed by Japan and EU. Until now off-grid installation have dominated the solar PV market

443

Research Portals: Status Quo and Improvement Perspectives  

Science Conference Proceedings (OSTI)

Research portals are a means to present, discuss, and advance scientific findings. They are web-based knowledge management tools for research communities. Research portals foster collaboration among a community of scientists, research funders, and political ... Keywords: Knowledge Management, Maturity Model, Research Community, Research Dissemination, Research Portal, Status Quo Analysis

Jrg Becker; Ralf Knackstedt; Lukasz Lis; Armin Stein; Matthias Steinhorst

2012-07-01T23:59:59.000Z

444

LLNL-PRES-407935 Mirror Status Workshop  

E-Print Network (OSTI)

LLNL-PRES-407935 Mirror Status Workshop September 8-9, 2008 Lawrence Berkeley National Laboratory; #12; #12; #12;LLNL-PRES-406923 Comments-9 September 2008 R. F. Post, LLNL MW08-01 #12;The Kinetic Stabilizer concept allows the use of axisymmetric

445

Electricity from Renewables: Status, Prospects, and Impediments  

E-Print Network (OSTI)

Electricity from Renewables: Status, Prospects, and Impediments America's Energy Future Study Panel on Electricity from Renewables K. John Holmes, National Research Council, Study Director (jholmes@nas.edu) #12, Carnegie Mellon University ·James J. Markowsky***, American Electric Power (Ret.) ·Richard A. Meserve

Kammen, Daniel M.

446

The Current and Historical Distribution of Special Status Amphibians at the Livermore Site and Site 300  

SciTech Connect

65 surveys were completed in 2002 to assess the current distribution of special status amphibians at the Lawrence Livermore National Laboratory's (LLNL) Livermore Site and Site 300. Combined with historical information from previous years, the information presented herein illustrates the dynamic and probable risk that amphibian populations face at both sites. The Livermore Site is developed and in stark contrast to the mostly undeveloped Site 300. Yet both sites have significant issues threatening the long-term sustainability of their respective amphibian populations. Livermore Site amphibians are presented with a suite of challenges inherent of urban interfaces, most predictably the bullfrog (Rana catesbeiana), while Site 300's erosion issues and periodic feral pig (Sus scrofa) infestations reduce and threaten populations. The long-term sustainability of LLNL's special status amphibians will require active management and resource commitment to maintain and restore amphibian habitat at both sites.

Hattem, M V; Paterson, L; Woollett, J

2008-08-20T23:59:59.000Z

447

Status of the Integral Fast Reactor fuel cycle demonstration and waste management practices  

SciTech Connect

Over the past few years, Argonne National Laboratory has been preparing for the demonstration of the fuel cycle for the Integral Fast Reactor (IFR), an advanced reactor concept that takes advantage of the properties of metallic fuel and liquid metal cooling to offer significant improvements in reactor safety and operations, fuel-cycle economics, environmental protection, and safeguards. The IFR fuel cycle, which will be demonstrated at Argonne-West in Idaho, employs a pyrometallurgical process using molten salts and liquid metals to recover actinides from spent fuel. The required facility modifications and process equipment for the demonstration are nearing completion. Their status and the results from initial fuel fabrication work, including the waste management aspects, are presented. Additionally, estimated compositions of the various process waste streams have been made, and characterization and treatment methods are being developed. The status of advanced waste processing equipment being designed and fabricated is described.

Benedict, R.W.; Goff, K.M.; McFarlane, H.F.

1994-07-01T23:59:59.000Z

448

Microsoft PowerPoint - FAQS Status_Sep 18 2012_JYarrington.ppt [Compatibility Mode]  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 18, 2012 September 18, 2012 Jeanette Yarrington Updates to TSP Process * Five-year "Sunset" reviews - for currency, accuracy, and continuing need/value. * Project Justification Statement (PJS) prior to proceeding with a new or revised DOE technical standard with a new or revised DOE technical standard. * The convention that the TSP is adopting is for all DOE The convention that the TSP is adopting is for all DOE Technical Standards requirements to be written with "shall" statements, consistent with the convention used b t j ti l t d d b di by most major national consensus standards bodies. Status of FAQS Qualification Standard Sponsor/POC FTCP Agent Status Chemical Processing EM/Mike Mikolanis and Patricia Suggs Mike Mikolanis Complete - Approved 02/2010 Criticality Safety Idaho/Adolf Dary Newbry

449

Complete genome sequence of Methanoculleus marisnigri type strain JR1  

SciTech Connect

Methanoculleus marisnigri Romesser et al. 1981 is a methanogen belonging to the order Methanomicrobiales within the archaeal phylum Euryarchaeota. The type strain, JR1, was isolated from anoxic sediments of the Black Sea. M. marisnigri is of phylogenetic interest because at the time the sequencing project began only one genome had previously been sequenced from the order Methanomicrobiales. We report here the complete genome sequence of M. marisnigri type strain JR1 and its annotation. This is part of a Joint Genome Institute 2006 Community Sequencing Program to sequence genomes of diverse Archaea.

Anderson, Iain [U.S. Department of Energy, Joint Genome Institute; Sieprawska-Lupa, Magdalena [University of Georgia, Athens, GA; Goltsman, Eugene [U.S. Department of Energy, Joint Genome Institute; Lapidus, Alla L. [U.S. Department of Energy, Joint Genome Institute; Copeland, A [U.S. Department of Energy, Joint Genome Institute; Glavina Del Rio, Tijana [U.S. Department of Energy, Joint Genome Institute; Tice, Hope [U.S. Department of Energy, Joint Genome Institute; Dalin, Eileen [U.S. Department of Energy, Joint Genome Institute; Barry, Kerrie [U.S. Department of Energy, Joint Genome Institute; Saunders, Elizabeth H [Los Alamos National Laboratory (LANL); Han, Cliff [Los Alamos National Laboratory (LANL); Brettin, Tom [Los Alamos National Laboratory (LANL); Detter, J. Chris [U.S. Department of Energy, Joint Genome Institute; Bruce, David [Los Alamos National Laboratory (LANL); Mikhailova, Natalia [U.S. Department of Energy, Joint Genome Institute; Pitluck, Sam [U.S. Department of Energy, Joint Genome Institute; Hauser, Loren John [ORNL; Land, Miriam L [ORNL; Lucas, Susan [U.S. Department of Energy, Joint Genome Institute; Richardson, P M [U.S. Department of Energy, Joint Genome Institute; Whitman, W. B. [University of Georgia, Athens, GA; Kyrpides, Nikos C [U.S. Department of Energy, Joint Genome Institute

2009-01-01T23:59:59.000Z

450

Complete genome sequence of Methanocorpusculum labreanum type strain Z  

Science Conference Proceedings (OSTI)

Methanocorpusculum labreanum is a methanogen belonging to the order Methanomicrobiales within the archaeal phylum Euryarchaeota. The type strain Z was isolated from surface sediments of Tar Pit Lake in the La Brea Tar Pits in Los Angeles, California. M. labreanum is of phylogenetic interest because at the time the sequencing project began only one genome had previously been sequenced from the order Methanomicrobiales. We report here the complete genome sequence of M. labreanum type strain Z and its annotation. This is part of a 2006 Joint Genome Institute Community Sequencing Program project to sequence genomes of diverse Archaea.

Anderson, Iain [U.S. Department of Energy, Joint Genome Institute; Sieprawska-Lupa, Magdalena [University of Georgia, Athens, GA; Goltsman, Eugene [U.S. Department of Energy, Joint Genome Institute; Lapidus, Alla L. [U.S. Department of Energy, Joint Genome Institute; Copeland, A [U.S. Department of Energy, Joint Genome Institute; Glavina Del Rio, Tijana [U.S. Department of Energy, Joint Genome Institute; Tice, Hope [U.S. Department of Energy, Joint Genome Institute; Dalin, Eileen [U.S. Department of Energy, Joint Genome Institute; Barry, Kerrie [U.S. Department of Energy, Joint Genome Institute; Pitluck, Sam [U.S. Department of Energy, Joint Genome Institute; Hauser, Loren John [ORNL; Land, Miriam L [ORNL; Lucas, Susan [U.S. Department of Energy, Joint Genome Institute; Richardson, P M [U.S. Department of Energy, Joint Genome Institute; Whitman, W. B. [University of Georgia, Athens, GA; Kyrpides, Nikos C [U.S. Department of Energy, Joint Genome Institute

2009-01-01T23:59:59.000Z

451

High performance static latches with complete single event upset immunity  

DOE Patents (OSTI)

An asymmetric response latch providing immunity to single event upset without loss of speed is described. The latch has cross-coupled inverters having a hardened logic state and a soft state, wherein the logic state of the first inverter can only be changed when the voltage on the coupling node of that inverter is low and the logic state of the second inverter can only be changed when the coupling of that inverter is high. One of more of the asymmetric response latches may be configured into a memory cell having complete immunity, which protects information rather than logic states. 5 figures.

Corbett, W.T.; Weaver, H.T.

1994-04-26T23:59:59.000Z

452

Completion report: Raft River Geothermal Production Well Four (RRGP-4)  

DOE Green Energy (OSTI)

The fourth Raft River well was originally drilled to 866 m (2840 ft), for use as a test injection well. This well allowed the injection of geothermal fluids into the intermediate zone--above the geothermal production zone and below the shallow groundwater aquifers. After this testing, the well was deepened and cased for use as a production well. The well's designation was changed from RRGI-4 to RRGP-4. This report describes the drilling and completion of both drilling projects. Results of well tests are also included.

Miller, L.G.; Prestwich, S.M.

1979-02-01T23:59:59.000Z

453

Summary of Electrolytic Hydrogen Production: Milestone Completion Report  

SciTech Connect

This report provides an overview of the current state of electrolytic hydrogen production technologies and an economic analysis of the processes and systems available as of December 2003. The operating specifications of commercially available electrolyzers from five manufacturers, i.e., Stuart, Teledyne, Proton, Norsk Hydro, and Avalence, are summarized. Detailed economic analyses of three systems for which cost and economic data were available were completed. The contributions of the cost of electricity, system efficiency, and capital costs to the total cost of electrolysis are discussed.

Ivy, J.

2004-09-01T23:59:59.000Z

454

Summary of Electrolytic Hydrogen Production: Milestone Completion Report  

SciTech Connect

This report provides an overview of the current state of electrolytic hydrogen production technologies and an economic analysis of the processes and systems available as of December 2003. The operating specifications of commercially available electrolyzers from five manufacturers, i.e., Stuart, Teledyne, Proton, Norsk Hydro, and Avalence, are summarized. Detailed economic analyses of three systems for which cost and economic data were available were completed. The contributions of the cost of electricity, system efficiency, and capital costs to the total cost of electrolysis are discussed.

Ivy, J.

2004-04-01T23:59:59.000Z

455

Complete genome sequence of Ferroglobus placidus AEDII12DO  

Science Conference Proceedings (OSTI)

Ferroglobus placidus belongs to the order Archaeoglobales within the archaeal phylum Euryar- chaeota. Strain AEDII12DO is the type strain of the species and was isolated from a shallow marine hydrothermal system at Vulcano, Italy. It is a hyperthermophilic, anaerobic chemoli- thoautotroph, but it can also use a variety of aromatic compounds as electron donors. Here we describe the features of this organism together with the complete genome sequence and anno- tation. The 2,196,266 bp genome with its 2,567 protein-coding and 55 RNA genes was se- quenced as part of a DOE Joint Genome Institute Laboratory Sequencing Program (LSP) project.

Anderson, Iain [U.S. Department of Energy, Joint Genome Institute; Risso, Carla [University of Massachusetts, Amherst; Holmes, Dawn [University of Massachusetts, Amherst; Lucas, Susan [U.S. Department of Energy, Joint Genome Institute; Copeland, A [U.S. Department of Energy, Joint Genome Institute; Lapidus, Alla L. [U.S. Department of Energy, Joint Genome Institute; Cheng, Jan-Fang [U.S. Department of Energy, Joint Genome Institute; Bruce, David [Los Alamos National Laboratory (LANL); Goodwin, Lynne A. [Los Alamos National Laboratory (LANL); Pitluck, Sam [U.S. Department of Energy, Joint Genome Institute; Saunders, Elizabeth H [Los Alamos National Laboratory (LANL); Brettin, Thomas S [ORNL; Detter, J. Chris [U.S. Department of Energy, Joint Genome Institute; Han, Cliff [Los Alamos National Laboratory (LANL); Tapia, Roxanne [Los Alamos National Laboratory (LANL); Larimer, Frank W [ORNL; Land, Miriam L [ORNL; Hauser, Loren John [ORNL; Woyke, Tanja [U.S. Department of Energy, Joint Genome Institute; Lovley, Derek [University of Massachusetts, Amherst; Kyrpides, Nikos C [U.S. Department of Energy, Joint Genome Institute; Ivanova, N [U.S. Department of Energy, Joint Genome Institute

2011-01-01T23:59:59.000Z

456

DOWNHOLE POWER GENERATION AND WIRELESS COMMUNICATIONS FOR INTELLIGENT COMPLETIONS APPLICATIONS  

SciTech Connect

The development work during this quarter was focused in the test of the wireless gauge in a well. The tool was sent to Halliburton for a test. The company indicated that the test well was not available for 4 months and the company was not able to schedule a test of the wireless gauge in its test well. The tool was returned to Tubel Tech's facility in The Woodlands. Tubel Tech is looking for a new test well to deploy the wireless gauge to complete the requirements for the DOE.

Paul Tubel

2005-05-08T23:59:59.000Z

457

High performance static latches with complete single event upset immunity  

SciTech Connect

An asymmetric response latch providing immunity to single event upset without loss of speed. The latch has cross-coupled inverters having a hardened logic state and a soft state, wherein the logic state of the first inverter can only be changed when the voltage on the coupling node of that inverter is low and the logic state of the second inverter can only be changed when the coupling of that inverter is high. One of more of the asymmetric response latches may be configured into a memory cell having complete immunity, which protects information rather than logic states.

Corbett, Wayne T. (Albuquerque, NM); Weaver, Harry T. (Albuquerque, NM)

1994-01-01T23:59:59.000Z

458

White Paper on Energy Efficiency Status of Energy-Using Products in China (2011)  

E-Print Network (OSTI)

Standardization. White Paper Energy Efficiency Status ofbased on the White Paper - Energy Efficiency Status oftransformer). In White Paper Energy Efficiency Status of

Zhou, Nan

2013-01-01T23:59:59.000Z

459

White Paper on Energy Efficiency Status of Energy-Using Products in China (2012)  

E-Print Network (OSTI)

and others. White Paper Energy Efficiency Status ofand others. White Paper Energy Efficiency Status ofL ABORATORY White Paper on Energy Efficiency Status of

Zhou, Nan

2013-01-01T23:59:59.000Z

460

Clean Energy Policy Analyses: Analysis of the Status and Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clean Energy Policy Analyses: Analysis of the Status and Impact of Clean Energy Policies at the Local Level Clean Energy Policy Analyses: Analysis of the Status and Impact of Clean...

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Status of DOE Research Efforts in Gas Hydrates | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status of DOE Research Efforts in Gas Hydrates Status of DOE Research Efforts in Gas Hydrates July 30, 2009 - 1:38pm Addthis Statement of Dr. Ray Boswell, National Energy...

462

Status report on the Advanced Light Source control system  

SciTech Connect

This paper is a status report on the ADVANCED LIGHT SOURCE (ALS) control system. The current status, performance data, and future plans will be discussed. Manpower, scheduling, and costs issues are addressed.

Magyary, S.; Chin, M.; Fahmie, M.; Lancaster, H.; Molinari, P.; Robb, A.; Timossi, C.; Young, J.

1991-11-11T23:59:59.000Z

463

Review and status of maglev in the United States  

DOE Green Energy (OSTI)

This report contains a slide show on the status and future of Maglev type transportation systems in the United States.

Coffey, H.T.

1993-12-31T23:59:59.000Z

464

Retail Unbundling status for Michigan - U.S. Energy Information ...  

U.S. Energy Information Administration (EIA)

Retail Unbundling- Michigan. Status: The state has begun the process of implementing comprehensive unbundling programs for its residential gas customers.

465

ARM - ARM Instrumentation Status: New, Current, and Future  

NLE Websites -- All DOE Office Websites (Extended Search)

Instrumentation Status: New, Current, and Future Publications Journal Articles Conference Documents Program Documents Technical Reports Publications Database Public Information...

466

FCV Learning Demonstration: Project Midpoint Status and Fall 2007 Results  

DOE Green Energy (OSTI)

Status reoprt on NREL's fuel cell vehicle learning demonstration presented at the 2007 EVS-23 meeting in Anaheim, CA.

Wipke, K.; Sprik, S.; Kurtz, J.; Thomas, H.; Garbak, J.

2007-12-01T23:59:59.000Z

467

Retail Unbundling status for the state of New York  

U.S. Energy Information Administration (EIA)

Retail Unbundling - New York. Status: The state has comprehensive unbundling programs for its residential gas customers. Overview: Natural gas ...

468

Complete genome sequence Methanothermus fervidus type strain (V24ST)  

DOE Green Energy (OSTI)

Methanothermus fervidus Stetter 1982 is the type strain of the genus Methanothermus. This hyperthermophilic genus is of a thought to be endemic in Icelandic hot springs. M. fervidus was not only the first characterized organism with a maximal growth temperature (97 C) close to the boiling point of water, but also the first archaeon in which a detailed functional analysis of its histone protein was reported and the first one in which the function of 2,3-cyclodiphosphoglycerate in thermoadaptation was characterized. Strain V24ST is of interest because of its very low substrate ranges, it grows only on H2 + CO2. This is the first completed genome sequence of the family Methanothermaceae. Here we describe the features of this organism, together with the complete genome sequence and annotation. The 1,243,342 bp long genome with its 1,311 protein-coding and 50 RNA genes is a part of the Genomic Encyclopedia of Bacteria and Archaea project.

Anderson, Iain [U.S. Department of Energy, Joint Genome Institute; Djao, Olivier Duplex [HZI - Helmholtz Centre for Infection Research, Braunschweig, Germany; Misra, Monica [Los Alamos National Laboratory (LANL); Chertkov, Olga [Los Alamos National Laboratory (LANL); Nolan, Matt [U.S. Department of Energy, Joint Genome Institute; Lucas, Susan [U.S. Department of Energy, Joint Genome Institute; Lapidus, Alla L. [U.S. Department of Energy, Joint Genome Institute; Glavina Del Rio, Tijana [U.S. Department of Energy, Joint Genome Institute; Tice, Hope [U.S. Department of Energy, Joint Genome Institute; Cheng, Jan-Fang [U.S. Department of Energy, Joint Genome Institute; Tapia, Roxanne [Los Alamos National Laboratory (LANL); Han, Cliff [Los Alamos National Laboratory (LANL); Goodwin, Lynne A. [Los Alamos National Laboratory (LANL); Pitluck, Sam [U.S. Department of Energy, Joint Genome Institute; Liolios, Konstantinos [U.S. Department of Energy, Joint Genome Institute; Ivanova, N [U.S. Department of Energy, Joint Genome Institute; Mavromatis, K [U.S. Department of Energy, Joint Genome Institute; Mikhailova, Natalia [U.S. Department of Energy, Joint Genome Institute; Pati, Amrita [U.S. Department of Energy, Joint Genome Institute; Brambilla, Evelyne-Marie [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany; Chen, Amy [U.S. Department of Energy, Joint Genome Institute; Palaniappan, Krishna [U.S. Department of Energy, Joint Genome Institute; Land, Miriam L [ORNL; Hauser, Loren John [ORNL; Chang, Yun-Juan [ORNL; Jeffries, Cynthia [Oak Ridge National Laboratory (ORNL); Sikorski, Johannes [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany; Spring, Stefan [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany; Rohde, Manfred [HZI - Helmholtz Centre for Infection Research, Braunschweig, Germany; Eichinger, Konrad [Universitat Regensburg, Regensburg, Germany; Huber, Harald [Universitat Regensburg, Regensburg, Germany; Wirth, Reinhard [Universitat Regensburg, Regensburg, Germany; Goker, Markus [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany; Detter, J. Chris [U.S. Department of Energy, Joint Genome Institute; Woyke, Tanja [U.S. Department of Energy, Joint Genome Institute; Bristow, James [U.S. Department of Energy, Joint Genome Institute; Eisen, Jonathan [U.S. Department of Energy, Joint Genome Institute; Markowitz, Victor [U.S. Department of Energy, Joint Genome Institute; Hugenholtz, Philip [U.S. Department of Energy, Joint Genome Institute; Kyrpides, Nikos C [U.S. Department of Energy, Joint Genome Institute; Klenk, Hans-Peter [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany

2010-01-01T23:59:59.000Z

469

Geopressured-geothermal well report. Volume I. Drilling and completion  

DOE Green Energy (OSTI)

Gladys McCall site activities are covered through the completion of the test well and salt water disposal well. The test well was drilled to a total depth of 16,510 feet, then plugged back to 15,831 feet. Three 4'' diameter diamond cores were taken for analysis. An existing well on site, the Getty-Butts Gladys McCall No. 1, was reentered and completed to a depth of 3514 feet as a salt water disposal well. The geologic interpretation of the Gladys McCall site indicated target sands for testing at 15,080 feet through 15, 831 feet. Reservoir fluid temperature at this depth is estimated to be approximately 313/sup 0/F and pressure is estimated to be +-12,800 psi. The preliminary reservoir volume estimate is 3.6 billion barrels of brine. The design wells program includes environmental monitoring of the Gladys McCall site by Louisiana State University. Field stations are set up to monitor surface and ground water quality, subsidence, land loss and shoreline erosion, and seismicity. As of December 31, 1981 the study shows no significant impact on the environment by site operations.

Not Available

1982-01-01T23:59:59.000Z

470

Completion report for Well Cluster ER-20-5  

SciTech Connect

The Well Cluster ER-20-5 drilling and completion project was conducted for the US Department of Energy, Nevada Operations Office (DOE/NV), in support of the Nevada Environmental Restoration Project at the Nevada Test Site (NTS) in Nye County, Nevada. Its primary tasks include collecting geological, geophysical, hydrological, and water chemistry data from new and existing wells to define groundwater quality in addition to pathways and rates of groundwater migration. A program of drilling wells near the sites of selected underground nuclear tests (near-field drilling) was implemented to obtain site-specific data about the nature and extent of migration of radionuclides that might have been produced by an underground nuclear explosion. Well Cluster ER-20-5 is the first near-field drilling project initiated at the NTS. This document presents construction data and summarizes the scientific data gathered during the drilling and well-installation phases for all three holes drilled at Well Cluster ER-20-5. Some of this information is preliminary and unprocessed, but was released so that drilling, geotechnical, well design, and completion data could be rapidly disseminated. Additional information about water levels, aquifer testing, and groundwater sampling will be reported after any of this work is performed. Any additional geologic and/or geophysical investigations conducted for this project is described in one or more analysis and interpretation reports. The lithologic and stratigraphic logs, however, are provided in final form.

NONE

1997-03-01T23:59:59.000Z

471

Complete genome sequence of Actinosynnema mirum type strain (101T)  

SciTech Connect

Actinosynnema mirum Hasegawa et al. 1978 is the type species of the genus, and is of phylogenetic interest because of its central phylogenetic location in the Actino-synnemataceae, a rapidly growing family within the actinobacterial suborder Pseudo-nocardineae. A. mirum is characterized by its motile spores borne on synnemata and as a producer of nocardicin antibiotics. It is capable of growing aerobically and under a moderate CO2 atmosphere. The strain is a Gram-positive, aerial and substrate mycelium producing bacterium, originally isolated from a grass blade collected from the Raritan River, New Jersey. Here we describe the features of this organism, together with the complete genome sequence and annotation. This is the first complete genome sequence of a member of the family Actinosynnemataceae, and only the second sequence from the actinobacterial suborder Pseudonocardineae. The 8,248,144 bp long single replicon genome with its 7100 protein-coding and 77 RNA genes is part of the Genomic Encyclopedia of Bacteria and Archaea project.

Land, Miriam; Lapidus, Alla; Mayilraj, Shanmugam; Chen, Feng; Copeland, Alex; Glavina Del Rio, Tijana; Nolan, Matt; Lucas, Susan; Tice, Hope; Cheng, Jan-Fang; Chertkov, Olga; Bruce, David; Goodwin, Lynne; Pitluck, Sam; Rohde, Manfred; Goker, Markus; Pati, Amrita; Ivanova, Natalia; Mavrommatis, Konstantinos; Chen, Amy; Palaniappan, Krishna; Hauser, Loren; Chang, Yun-Juan; Jefferies, Cynthia; Brettin, Thomas; Detter, John C.; Han, Cliff; Chain, Patrick; Tindall, Brian; Bristow, James; Eisen, Jonathan A.; Markowitz, Victor; Hugenholtz, Philip; Kyrpides, Nikos C.; Klenk, Hans-Peter

2009-05-20T23:59:59.000Z

472

UTSI/CFFF MHD program completion and related activity  

DOE Green Energy (OSTI)

Maintenance work on the DOE CFFF facility and other related government property remained in suspension in accordance with the stop work order issued by DOE. Environmental remediation and preservation of the facility continued. Final actions were completed to dispose of the soil that was contaminated by diesel oil. Actions are underway to dispose of other wastes. Progress is reported on the 5 high temperature superconductivity projects under Task 6. Results are reported for various techniques for annealing cold rolled nickel tapes and applying buffer layer by the Sol-Gel process. Included in the annealing/coating work is one case that involved oxidizing the nickel to nickel oxide which is textured before application of the buffer layer. Work under the Optimum Coated Conductor included issuing a topical report describing the work on grain boundary grooving in nickel substrates as a function of annealing temperature and time. Also, the work to evaluate the mutual effects of adjacent superconductors. In the cost/performance analysis project, completion of a study on the economics of production of coated conductors by the MOCVD process is reported. In the diagnostics for real time process control project, a topical report that outlines the requirements for control of promising manufacturing processes was submitted, additional work is reported on using absorption spectroscopy as the basis for control of the stoichiometry for the MOCVD process and the work on scatterometry for measuring uniformity of surfaces is summarized.

Dr. Joel W. Muehlhauser; Dr. James N. Chapman

1999-07-30T23:59:59.000Z

473

Wind Power Technology Status and Performance and Cost Estimates - 2009  

Science Conference Proceedings (OSTI)

This report provides an update on the status and cost of wind power technology based on the Wind Power Technology Status and Performance and Cost Estimates 2008 (EPRI report 1015806). It addresses the status of wind turbine and related technology for both onshore and offshore applications and the performance and cost of onshore wind power plants.

2009-11-20T23:59:59.000Z

474

User Agreement and Proprietary Account Status  

NLE Websites -- All DOE Office Websites (Extended Search)

User Agreement and Proprietary Account Status (04-Oct-2013) User Agreement and Proprietary Account Status (04-Oct-2013) Listed below are the 562 institutions that have signed APS User Agreements as financially contributing CAT members (indicated by CAT acronyms) and/or as non-members (indicated by "GU") as of (04-Oct-2013). A CAT Agreement covers users' activities at that CAT's beam lines; a GU Agreement covers users' activities at any APS beam line. All listed Agreements are nonproprietary unless otherwise noted. A superscript p indicates that a proprietary User Account has also been established. If you are not an ANL employee, a User Agreement signed by your home institution is a prerequisite for hands-on work at the APS. If your institution is not listed below (or if your institution is listed but a

475

Status and Impact of State MTBE Bans  

Gasoline and Diesel Fuel Update (EIA)

Status and Impact of State MTBE Bans Status and Impact of State MTBE Bans Background As a result of the Clean Air Act Amendments of 1990 (CAAA90), the year-round use of reformulated gasoline (RFG) has been required in cities with the worst smog problems since 1995 (Figure 1). One of the requirements of RFG specified by CAAA90 is a 2- percent oxygen requirement, which is met by blending "oxygenates," 1 including methyl tertiary butyl ether (MTBE) and ethanol, into the gasoline. MTBE is the oxygenate used in almost all RFG outside of the Midwest. Ethanol is currently used in the Midwest as an oxygenate in RFG and as an octane booster and volume extender in conventional gasoline. Several years ago, MTBE was detected in water supplies scattered throughout the country, but predominantly in areas using RFG. MTBE from RFG was apparently

476

July 2012, Training Work Group Status Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Work Group Status Overview Training Work Group Status Overview Accomplishments: 1. May 7 - 8. Attended NIEHS Trainer's Exchange in Oak Ridge . 2. May 8 - 9. Joined HAMMER in visiting Oak Ridge entities to build support for the Radworker Pilot. 3. June 19-20. Joined Char Wells at Sandia (with NIEHS and HAMMER) for the Learning/Training Workshop. 2. NTC offered support for Data Warehousing at the Learning/Training Workshop. 3. Obtained EFCOG commitment to create a Human Capital Training Subgroup under the Business Management Working Group. 4. June 20 - 21. Hosted HAMMER to develop Radworker Reciprocity Program Checklist. 5. July 10-11. HSS Focus Group Training Working Group and Subcommittee meetings at NTC. Upcoming Meetings: Boardman meeting with HAMMER week of July 29.

477

September 2012, Training Work Group Status Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Work Group Status Overview Training Work Group Status Overview Accomplishments: 1. May 7-8. Attended NIEHS Trainer's Exchange in Oak Ridge. 2. May 8-9. Joined HAMMER in visiting Oak Ridge entities to build support for the Radworker pilot. Entities visited included ORISE, Y-12, DOE TRU Project, and local labor entities. 3. June 19-20. Participated with Char Wells, Sandia National Laboratory Training Manager, (NTC, NIEHS and HAMMER in attendance) at a DOE M&O contractor led Learning/Training Workshop. - Obtained EFCOG commitment to create a Human Capital Training Subgroup under the Business Management Working Group. - Serving this group as data repository and communications hub for efforts to standardize General Employee Radiation Training (GERT) within DOE. - Briefed the complex wide Radworker reciprocity concept finding interest and

478

Fossil energy waste management. Technology status report  

SciTech Connect

This report describes the current status and recent accomplishments of the Fossil Energy Waste Management (FE WM) projects sponsored by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The primary goal of the Waste Management Program is to identify and develop optimal strategies to manage solid by-products from advanced coal technologies for the purpose of ensuring the competitiveness of advanced coal technologies as a future energy source. The projects in the Fossil Energy Waste Management Program are divided into three types of activities: Waste Characterization, Disposal Technologies, and Utilization Technologies. This technology status report includes a discussion on barriers to increased use of coal by-products. Also, the major technical and nontechnical challenges currently being addressed by the FE WM program are discussed. A bibliography of 96 citations and a list of project contacts is included if the reader is interested in obtaining additional information about the FE WM program.

Bossart, S.J.; Newman, D.A.

1995-02-01T23:59:59.000Z

479

Natural Gas Vehicles: Status, Barriers, and Opportunities  

NLE Websites -- All DOE Office Websites (Extended Search)

ESD/10-4 ESD/10-4 Natural Gas Vehicles: Status, Barriers, and Opportunities Energy Systems Division About Argonne National Laboratory Argonne is a U.S. Department of Energy laboratory managed by UChicago Argonne, LLC under contract DE-AC02-06CH11357. The Laboratory's main facility is outside Chicago, at 9700 South Cass Avenue, Argonne, Illinois 60439. For information about Argonne and its pioneering science and technology programs, see www.anl.gov.

480

Status Update: Closing Rocky Flats by 2006  

SciTech Connect

Safely closing Rocky Flats by December 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy (DOE), Kaiser-Hill and its team of subcontractors, the site's employees and taxpayers across the country. This paper will: provide a status of the Closure Project to date; describe important accomplishments of the past year; describe some of the closure-enhancing technologies enabling acceleration; and discuss the remaining challenges ahead.

Tuor, N.; Schubert, A.

2003-02-25T23:59:59.000Z

Note: This page contains sample records for the topic "vacancy status completely" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Status Assessment of Cadmium Telluride Photovoltaic Technology  

Science Conference Proceedings (OSTI)

Thin-film cadmium telluride (CdTe) solar cells are the basis of a potentially significant technology for commercial solar-energy production. This report provides a description of laboratory- and commercial-scale CdTe thin-film technologies and their status with respect to both present performance and understanding of ultimate technology limitations. Small laboratory-scale cells have achieved efficiencies over 16%, while larger monolithic thin-film modules have demonstrated over 11% efficiency and long-te...

2004-01-12T23:59:59.000Z

482

Gasification Users Association - Technology Status - December 2011  

Science Conference Proceedings (OSTI)

This report addresses the worldwide market and technology status of gasification technologies. The market for gasification technologies is primarily in China where national policy has established a major coal-to-chemicals industry and plans to add major plants for coal-to-substitute natural gas (SNG) and coal-to-liquid transportation fuels in the next five-year plan. Gasification is also being deployed to some extent in other Asian countries (for example, Korea and India) and elsewhere. Gasification tech...

2011-12-30T23:59:59.000Z

483

Gasification Users Association: Technology Status - December 2012  

Science Conference Proceedings (OSTI)

This report addresses the worldwide market and technology status of gasification technologies. The market for gasification technologies is primarily in China, where national policy has established a major coaltochemicals industry and plans to add major coaltosubstitute natural gas and coaltoliquid transportation fuels in the next five-year plan. Gasification is being deployed to a lesser extent in other Asian countries and elsewhere. Gasification technology ...

2012-12-31T23:59:59.000Z

484

Status of SOFC development in USA  

DOE Green Energy (OSTI)

Solid oxide fuel cells represent a highly efficient power generation/cogeneration source in the United States and worldwide. Currently, the US is a leader in this technology in the tubular, monolithic and planar solid oxide fuel cell areas. In addition, research is being conducted in intermediate temperature solid oxide fuel cells. An overview of the status of these technologies, research, and critical issues is presented.

Hooie, D.T.

1993-06-01T23:59:59.000Z

485

The status of fuel cell technology  

DOE Green Energy (OSTI)

This brief status report provides an introduction to what fuel cells are, why they are important, what uses have been made of them to date, the goals and timetables of current programs, and who the players are in this vital technology. Copies of most of the slides presented and additional diagrams are appended to this paper. Further details can be obtained from the comprehensive texts cited in the bibliography. 11 refs., 44 figs.

O'Sullivan, J.B.

1991-02-20T23:59:59.000Z

486

Propane Vehicles: Status, Challenges, and Opportunities  

NLE Websites -- All DOE Office Websites (Extended Search)

Propane Vehicles: Propane Vehicles: Status, Challenges, and Opportunities ANL/ESD/10-2 Energy Systems Division Availability of This Report This report is available, at no cost, at http://www.osti.gov/bridge. It is also available on paper to the U.S. Department of Energy and its contractors, for a processing fee, from: U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62

487

Spot Award Recipient List-complete 11-2013.xlsx  

NLE Websites -- All DOE Office Websites (Extended Search)

Recipient Recipient Division Date Award For (Pictures) Kurt Ettinger EHS 09/2013 Kurt created Smartsheets for the Fall Protection Permit Inventory and helped develop a digital Fall Protection Matrix which tracks real-time projects that require fall protection systems to protect workers from fall hazards. The effort enabled a scientist complete required training and obtain permit off-site for work near Pemberton, NJ. Kurt's effort also enables EHS to introduce paperless record keeping processes to the Fall Protection Competent Person Group in Q1FY14. David Mustar FA 09/2013 On a Saturday before dawn, David was walking in the B71 area checking on liquid nitrogen tanks when he heard a faint sound. After a considerable time searching for the source of the sound, he came near a trailer and realized

488

Application of High Powered Lasers to Perforated Completions  

NLE Websites -- All DOE Office Websites (Extended Search)

Congress on Applications of Laser & Electro-Optics Congress on Applications of Laser & Electro-Optics October 13 - 16, 2003, Jacksonville, Florida Application of High Powered Lasers to Perforated Completions Zhiyue Xu, Claude B. Reed and Keng H. Leong Argonne National Laboratory, 9700 South Cass Avenue, Argonne, IL 60439 R. A. Parker Parker Geoscience Consulting, LLC, 6346 Secrest Street, Arvada, CO 80403 R. M. Graves, Petroleum Engineering Department, Colorado School of Mines, Golden, CO 80401 ABSTRACT As part of the process of drilling an oil or gas well, a steel production casing is often inserted to the bottom of the well and sealed with cement against the productive formation. Openings must be made through the steel casing wall and cement and into the rock formation to allow formation fluid to enter the well. Conventionally, a perforator is

489

Microsoft Word - CX_Cederosa Phase I completion.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2011 5, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Jay Marcotte Project Manager - KEWU-4 Proposed Action: To provide BPA funding to acquire the Cedarosa Phase I completion parcel and to maintain this parcel and the 3 other Phase I parcels for fish habitat protection. Budget Information: Work Order # 00266311 Fish and Wildlife Project No.: 2009-003-00, BPA-004560 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in

490

SRS - Area Completion Projects - Federal Facility Agreement and Supporting  

NLE Websites -- All DOE Office Websites (Extended Search)

5/2013 5/2013 SEARCH GO spacer Administrative Record File/Information Repository File Federal Facility Agreement and Supporting Documentation General Information and Technologies Public Involvement Home SRS Home Area Completion Projects Federal Facility Agreement and Supporting Documentation * Federal Facility Agreement -The document that directs the comprehensive remediation of the Savannah River Site Appendix Affected by Modification: Appendix D Issuance of EPA and SCDHEC approved Revision.0 Appendix D for Fiscal Year 2013 (Print Date: 08/27/2013). The SCDHEC provided a comment on the Revision 0 Appendix D for Fiscal Year 2013 (Print Date: 08/27/2013) on Spetember 26, 2013. The EPA provided conditional approval, pending resolution of the SCDHEC's comment, of theRevision 0 Appendix D for Fiscal Year 2013 (Print Date: 08/27/2013) on October 30, 2013.

491

Waste treatment facility passes federal inspection, completes final  

NLE Websites -- All DOE Office Websites (Extended Search)

23, 2012 23, 2012 Media Contact: Danielle Miller, 208-526-5709 Erik Simpson, 208-390-9464 Waste treatment facility passes federal inspection, completes final milestone, begins startup The Idaho site today initiated the controlled, phased startup of a new waste treatment facility scheduled to begin treating 900,000 gallons of radioactive liquid waste stored in underground tanks at a former Cold War spent nuclear fuel reprocessing facility next month. An exterior view of the Integrated Waste Treatment Unit A U.S. Department of Energy (DOE) operational readiness review team (made up of Subject Matter Experts across the country) in early April identified a dozen issues for the cleanup contractor CH2M-WG Idaho, LLC (CWI) to resolve before the 53,000-square-foot Integrated Waste Treatment Unit

492

Energy Aware Scheduling for Weighted Completion Time and Weighted Tardiness  

E-Print Network (OSTI)

The ever increasing adoption of mobile devices with limited energy storage capacity, on the one hand, and more awareness of the environmental impact of massive data centres and server pools, on the other hand, have both led to an increased interest in energy management algorithms. The main contribution of this paper is to present several new constant factor approximation algorithms for energy aware scheduling problems where the objective is to minimize weighted completion time plus the cost of the energy consumed, in the one machine non-preemptive setting, while allowing release dates and deadlines.Unlike previous known algorithms these new algorithms can handle general job-dependent energy cost functions, extending the application of these algorithms to settings outside the typical CPU-energy one. These new settings include problems where in addition, or instead, of energy costs we also have maintenance costs, wear and tear, replacement costs, etc., which in general depend on the speed at which the machine r...

Carrasco, Rodrigo A; Stein, Cliff

2011-01-01T23:59:59.000Z

493

Completion of decommissioning: Monitoring for site release and license termination  

SciTech Connect

To request termination of a license upon completion of dismantling or decommissioning activities, documenting any residual radioactivity to show that the levels are environmentally acceptable will be necessary. When the regulators approve the decommissioning plan, they establish what the release criteria for the decommissioned site will be at the time of the site release and license termination. The criteria are numeric guidelines for direct radiation in soils and on surfaces. If the regulatory body finds that the measured on-site values are below the guidelines, the site will be acceptable for unrestricted release (no radiological controls or future use). If areas are found above those values, more decontamination or cleanup of these areas may be required unless the regulatory body grants an exemption.

Boing, L.E.

1997-08-01T23:59:59.000Z

494

Complete genome sequence of Thauera aminoaromatica strain MZ1T  

Science Conference Proceedings (OSTI)

Thauera aminoaromatica strain MZ1T, an isolate belonging to genus Thauera, of the family Rhodocyclaceae and the class the Betaproteobacteria, has been characterized for its ability to produce abundant exopolysaccharide and degrade various aromatic compounds with nitrate as an electron acceptor. These properties, if fully understood at the genome-sequence level, can aid in environmental processing of organic matter in anaerobic cycles by short-circuiting a central anaerobic metabolite, acetate, from microbiological conversion to methane, a criti-cal greenhouse gas. Strain MZ1T is the first strain from the genus Thauera with a completely sequenced genome. The 4,496,212 bp chromosome and 78,374 bp plasmid contain 4,071 protein-coding and 71 RNA genes, and were sequenced as part of the DOE Community Se-quencing Program CSP{_}776774.

Sanseverino, John [ORNL; Chauhan, Archana [University of Tennessee, Knoxville (UTK); Lucas, Susan [U.S. Department of Energy, Joint Genome Institute; Copeland, A [U.S. Department of Energy, Joint Genome Institute; Lapidus, Alla L. [U.S. Department of Energy, Joint Genome Institute; Glavina Del Rio, Tijana [U.S. Department of Energy, Joint Genome Institute; Dalin, Eileen [U.S. Department of Energy, Joint Genome Institute; Tice, Hope [U.S. Department of Energy, Joint Genome Institute; Bruce, David [Los Alamos National Laboratory (LANL); Goodwin, Lynne A. [Los Alamos National Laboratory (LANL); Pitluck, Sam [U.S. Department of Energy, Joint Genome Institute; Sims, David [Los Alamos National Laboratory (LANL); Brettin, Thomas S [ORNL; Detter, J. Chris [U.S. Department of Energy, Joint Genome Institute; Han, Cliff [Los Alamos National Laboratory (LANL); Chang, Yun-Juan [ORNL; Larimer, Frank W [ORNL; Land, Miriam L [ORNL; Hauser, Loren John [ORNL; Kyrpides, Nikos C [U.S. Department of Energy, Joint Genome Institute; Mikhailova, Natalia [U.S. Department of Energy, Joint Genome Institute; Moser, Scott [University of Tennessee, Knoxville (UTK); Jegier, Patricia [University of Tennessee, Knoxville (UTK); Close, Dan [University of Tennessee, Knoxville (UTK); Wang, Ying [University of Tennessee, Knoxville (UTK); Layton, Alice [University of Tennessee, Knoxville (UTK); Allen, Michael S. [University of Tennessee, Knoxville (UTK); Sayler, Gary [University of Tennessee, Knoxville (UTK)

2012-01-01T23:59:59.000Z

495

Complete genome sequence of Paenibacillus sp. strain JDR-2  

Science Conference Proceedings (OSTI)

Paenibacillus sp. strain JDR-2, an aggressively xylanolytic bacterium isolated from sweetgum (Liquidambar styraciflua) wood, is able to efficiently depolymerize, assimilate and metabolize 4-O-methylglucuronoxylan, the predominant structural component of hardwood hemicelluloses. A basis for this capability was first supported by the identification of genes and characterization of encoded enzymes and has been further defined by the sequencing and annotation of the complete genome, which we describe. In addition to genes implicated in the utilization of -1,4-xylan, genes have also been identified for the utilization of other hemicellulosic polysaccharides. The genome of Paenibacillus sp. JDR-2 contains 7,184,930 bp in a single replicon with 6,288 protein-coding and 122 RNA genes. Uniquely prominent are 874 genes encoding proteins involved in carbohydrate transport and metabolism. The prevalence and organization of these genes support a metabolic potential for bioprocessing of hemicellulose fractions derived from lignocellulosic resources.

Chow, Virginia [University of Florida; Nong, Guang [University of Florida; St. John, Franz J. [US Forest Service, Forest Products Laboratory, Madison, Wisconsin, USA; Dickstein, Ellen [University of Florida; Chertkov, Olga [Los Alamos National Laboratory (LANL); Bruce, David [Los Alamos National Laboratory (LANL); Detter, J. Chris [U.S. Department of Energy, Joint Genome Institute; Brettin, Thomas S [ORNL; Han, James [U.S. Department of Energy, Joint Genome Institute; Woyke, Tanja [U.S. Department of Energy, Joint Genome Institute; Pitluck, Sam [U.S. Department of Energy, Joint Genome Institute; Nolan, Matt [U.S. Department of Energy, Joint Genome Institute; Pati, Amrita [U.S. Department of Energy, Joint Genome Institute; Martin, Joel [U.S. Department of Energy, Joint Genome Institute; Copeland, A [U.S. Department of Energy, Joint Genome Institute; Land, Miriam L [ORNL; Goodwin, Lynne A. [Los Alamos National Laboratory (LANL); Jones, Jeffrey B. [University of Florida; Ingram, Lonnie O. [University of Florida; Shanmugam, Keelnathan T. [University of Florida; Preston, James F. [University of Florida

2012-01-01T23:59:59.000Z

496

Drilling, Completing, and Maintaining Geothermal Wells in Baca, New Mexico  

DOE Green Energy (OSTI)

A 55-MWe power plant is planned for development in the Baca location in the Jemez Mountains of New Mexico. Union Geothermal has contracted to provide the steam for the power plant. This paper uses Baca Well No. 13 as a case history to describe the drilling methods, casing program, cementing program, and completion methods used by Union. The discussion includes aerated-water drilling and the methods of solving corrosion problems in aerated water. lost circulation control in mud drilling and its effect on the subsequent casing cementing program are discussed. The paper also includes a case history of scale removal methods used in Baca Well No. 11, including drilling the scale out with a turbo-drill and attempts at chemical inhibition.

Pye, S.

1981-01-01T23:59:59.000Z

497

Status of the Linac Coherent Light Source  

Science Conference Proceedings (OSTI)

The Linac Coherent Light Source (LCLS) is a free electron laser facility in construction at Stanford Linear Accelerator Center. It is designed to operate in the wavelength range 0.15-1.5 nanometers. At the time of this conference, civil construction of new tunnels and buildings is complete, the necessary modifications to the SLAC linac are complete, and the undulator system and x-ray optics/diagnostics are being installed. The electron gun, 135 MeV injector linac and 250 MeV bunch compressor were commissioned in 2007. Accelerator commissioning activities are presently devoted to the achievement of performance goals for the completed 14 GeV linac.

Galayda, John N.; /SLAC

2011-11-04T23:59:59.000Z

498

May 15, 2012, Federal Technical Capability Program Face to Face Meeting … Presentation: Status of FAQS revision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 15, 2012 May 15, 2012 Jeanette Yarrington Process * Approve FAQS at 5-Year Intervals Identify Sponsor/POC and Revise FAQS FTCP Agents/DNFSB Staff Review Receive/Resolve Comments RevCom Process as Technical Standard Submit for DNFSB Staff Review FTCP Approval/CTA Concurrence Submit to TSP for Formal Posting FTCP Approval/CTA Concurrence Qualification Standard Sponsor/POC FTCP Agent Status Chemical Processing EM/Mike Mikolanis and Patricia Suggs Mike Mikolanis Complete - Approved 02/2010 Criticality Safety Idaho/Adolf Dary Newbry Complete - Approved 04/2009 Garcia and NA- SH/Jerry Hicks Environmental Compliance NA-173/Steve Black Mike Garcia Complete - Approved 06/2011 Facility Representative HSS/Earl Hughes Pat Worthington Complete - Approved 10/2010 *JTA needed Mechanical Systems Pantex/Terry