Powered by Deep Web Technologies
Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

Richmond Richmond PROJECT TITLE: EECBG - Solar Compactors and Recycling Units Page 1 of2 STATE: VA Funding Opportunity Announcement Number DE-FOA-0000013 Procurement Instrument Number DE-EE0000878 NEPA Control Number cm Number GFO-0000878-003 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

2

Project title:  

Broader source: Energy.gov (indexed) [DOE]

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

3

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Title: DEVELOPING A Title: DEVELOPING A COMPREHENSIVE RISK ASSESMENT FRAMEWORK FOR GEOLOGICAL STORAGE OF CO2 Ian Duncan University of Texas U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline 1. Benefit to the Program 2. Goals and Objectives 3. Technical Status Project 4. Accomplishments to Date 5. Summary 3 Benefit to the Program The research project is developing a comprehensive understanding of the programmatic (business), and technical risks associated with CCS particularly the likelihood of leakage and its potential consequences. This contributes to the Carbon Storage Program's effort of ensuring 99 percent CO

4

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

5

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

6

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

7

PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

Baltimore Baltimore PROJECT TITLE: EECBG - GHG Scrubbing System Page 1 of2 STATE: MD Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-EE0000738 GFO-0000738-002 0 Based all my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: All Technical advice and planning assistance to international, national, state, and local organizations. 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

8

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

9

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve into teams and having each team use a different m-health data collection tool (e.g., cellular phones, smart health patterns. The Tech Fellow, Jacqueline Ferguson, will assist in creating an m-health project

Gray, Jeffrey J.

10

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit to the Program * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * This research project develops a reservoir scale CO 2 plume migration model at the Sleipner project, Norway. The Sleipner project in the Norwegian North Sea is the world's first commercial scale geological carbon storage project. 4D seismic data have delineated the CO 2 plume migration history. The relatively long history and high fidelity data make

11

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Test and Evaluation of Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background information - Project Concept (MICP) - Ureolytic Biomineralization, Biomineralization Sealing * Accomplishments to Date - Site Characterization - Site Preparation - Experimentation and Modeling - Field Deployable Injection Strategy Development * Summary

12

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LBNL's Consolidated Sequestration Research Program (CSRP) Project Number FWP ESD09-056 Barry Freifeld Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefits and Goals of GEO-SEQ * Technical Status - Otway Project (CO2CRC) - In Salah (BP, Sonatrach and Statoil) - Ketzin Project (GFZ, Potsdam) - Aquistore (PTRC) * Accomplishments and Summary * Future Plans 3 Benefit to the Program * Program goals being addressed: - Develop technologies to improve reservoir storage capacity estimation - Develop and validate technologies to ensure 99 percent storage permanence.

13

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline I. Benefits II. Project Overview III. Technical Status A. Background B. Results IV. Accomplishments V. Summary 3 Benefit to the Program * Program goals. - Prediction of CO 2 storage capacity. * Project benefits. - Workforce/Student Training: Support of 3 student GAs in use of multiphase flow and geochemical models simulating CO 2 injection. - Support of Missouri DGLS Sequestration Program. 4 Project Overview: Goals and Objectives Project Goals and Objectives. 1. Training graduate students in use of multi-phase flow models related to CO 2 sequestration. 2. Training graduate students in use of geochemical models to assess interaction of CO

14

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Center for Coal's Center for Coal's FY10 Carbon Sequestration Peer Review February 8 - 12, 2010 2 Collaborators * Tissa Illangasekare (Colorado School of Mines) * Michael Plampin (Colorado School of Mines) * Jeri Sullivan (LANL) * Shaoping Chu (LANL) * Jacob Bauman (LANL) * Mark Porter (LANL) 3 Presentation Outline * Benefit to the program * Project overview * Project technical status * Accomplishments to date * Future Plans * Appendix 4 Benefit to the program * Program goals being addressed (2011 TPP): - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefit: - This project is developing system modeling capabilities that can be used to address challenges associated with infrastructure development, integration, permanence &

15

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Snøhvit CO Snøhvit CO 2 Storage Project Project Number: FWP-FEW0174 Task 4 Principal Investigators: L. Chiaramonte, *J.A. White Team Members: Y. Hao, J. Wagoner, S. Walsh Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Summary & Accomplishments * Appendix 3 Benefit to the Program * The research project is focused on mechanical

16

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

InSalah CO InSalah CO 2 Storage Project Project Number: FWP-FEW0174 Task 2 Principal Investigator: W. McNab Team Members: L. Chiaramonte, S. Ezzedine, W. Foxall, Y. Hao, A. Ramirez, *J.A. White Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Accomplishments * Summary * Appendix 3 Benefit to the Program * The research project is combining sophisticated

17

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Space Geodesy, Seismology, Space Geodesy, Seismology, and Geochemistry for Monitoring Verification and Accounting of CO 2 in Sequestration Sites DE-FE0001580 Tim Dixon, University of South Florida Peter Swart, University of Miami U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to program * Goals & objectives * Preliminary InSAR results (site selection phase) * Project location * Project installed equipment * Specific project results * Summary 3 Benefit to the Program * Focused on monitoring, verification, and accounting (MVA) * If successful, our project will demonstrate the utility of low cost, surface

18

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 DE-FE0001159 Advanced Technologies for Monitoring CO 2 Saturation and Pore Pressure in Geologic Formations Gary Mavko Rock Physics Project/Stanford University 2 Presentation Outline * Benefit to the Program * Project Overview * Motivating technical challenge * Approach * Technical Status - Laboratory results - Theoretical modeling * Summary Mavko: Stanford University 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations. - Develop technologies to demonstrate that 99% of injected CO 2 remains in injection zones. * Project benefits statement.

19

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Large Volume Injection of CO Large Volume Injection of CO 2 to Assess Commercial Scale Geological Sequestration in Saline Formations in the Big Sky Region Project Number: DE-FC26-05NT42587 Dr. Lee Spangler Big Sky Carbon Sequestration Partnership Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and Objectives * Project overview * Kevin Dome characteristics * Project design philosophy * Infrastructure * Modeling * Monitoring * Project Opportunities 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

20

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Research on Probabilistic and Research on Probabilistic Hydro-Thermo-Mechanical (HTM) Modeling of CO 2 Geological Sequestration (GS) in Fractured Porous Rocks Project DE-FE0002058 Marte Gutierrez, Ph.D. Colorado School of Mines U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program (Program goals addressed and Project benefits) * Project goals and objectives * Technical status - Project tasks * Technical status - Key findings * Lessons learned * Summary - Accomplishments to date 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Complexity and Choice of Complexity and Choice of Model Approaches for Practical Simulations of CO 2 Injection, Migration, Leakage, and Long- term Fate Karl W. Bandilla Princeton University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Project Number DE-FE0009563 2 Presentation Outline * Project Goals and Objectives * Project overview * Accomplishments * Summary 3 Benefit to the Program * The aim of the project is to develop criteria for the selection of the appropriate level of model complexity for CO 2 sequestration modeling at a given site. This will increase the confidence in modeling results, and reduce computational cost when appropriate.

22

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS: CCS: Life Cycle Water Consumption for Carbon Capture and Storage Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Benefit to the Program * Program goals being addressed. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints

23

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Leakage Mitigation Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number: FE0004478 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background Information * Accomplishments to Date - Injection strategy development (control and prediction) - Large core tests - ambient pressure - Large core tests - high pressure - Small core tests - high pressure - MCDP, permeability and porosity assessments * Progress Assessment and Summary

24

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CO2 Leakage Mitigation CO2 Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number FE0004478 Lee H Spangler, Al Cunningham, Robin Gerlach Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation * Background information * Large core tests - ambient pressure * Large core tests - high pressure 3 Benefit to the Program Program goals being addressed. Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Project benefits statement. The Engineered Biomineralized Sealing Technologies

25

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS CCS Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program goals being addressed. - Increased control of reservoir pressure, reduced risk of CO2 migration, and expanded formation storage capacity. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints on CCS deployment and provide insight into

26

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Multiphase of Multiphase Flow for Improved Injectivity and Trapping 4000.4.641.251.002 Dustin Crandall, URS PI: Grant Bromhal, NETL ORD Morgantown, West Virginia U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program * Project overview * Breakdown of FY12 project tasks * Facilities and personnel * Task progress to date * Planned task successes * Tech transfer and summary 3 Benefit to the Program * Program goal being addressed - Develop technologies that will support industries' ability to predict CO

27

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Advanced Resources International, Inc. Advanced Resources International, Inc. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Program goal being addressed: - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Project benefits statement: - This research seeks to develop a set of robust mathematical modules to predict how coal and shale permeability and

28

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SUMNER SUMNER COUNTY, KANSAS Project Number DE-FE0006821 W. Lynn Watney Kansas Geological Survey Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Fountainview Wednesday 8-21-12 1:10-1:35 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Acknowledgements & Disclaimer Acknowledgements * The work supported by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) under Grant DE-FE0002056 and DE- FE0006821, W.L. Watney and Jason Rush, Joint PIs. Project is managed and

29

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0-22, 2013 0-22, 2013 Collaborators Zhengrong Wang, Yale University Kevin Johnson, University of Hawaii 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 storage capacity - Demonstrate fate of injected CO 2 and most common contaminants * Project benefits statement: This research project conducts modeling, laboratory studies, and pilot-scale research aimed at developing new technologies and new systems for utilization of basalt formations for long term subsurface storage of CO 2 . Findings from this project

30

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

behavior of shales as behavior of shales as seals and storage reservoirs for CO2 Project Number: Car Stor_FY131415 Daniel J. Soeder USDOE/NETL/ORD U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Project Overview: Goals and Objectives * Program Goals - Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness * Project Objectives - Assess how shales behave as caprocks in contact with CO 2 under a variety of conditions - Assess the viability of depleted gas shales to serve as storage reservoirs for sequestered CO

31

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CO CO 2 leakage and cap rock remediation DE-FE0001132 Runar Nygaard Missouri University of Science and Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the program * Project overview * Technical status * Accomplishments to date * Summary 2 3 Benefit to the Program * Program goals being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefits statement. - The project develops a coupled reservoir and geomechanical modeling approach to simulate cap rock leakage and simulate the success of remediation

32

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Web-based CO Web-based CO 2 Subsurface Modeling Geologic Sequestration Training and Research Project Number DE-FE0002069 Christopher Paolini San Diego State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and goals. * Web interface for simulating water-rock interaction. * Development of, and experience teaching, a new Carbon Capture and Sequestration course at San Diego State University. * Some noteworthy results of student research and training in CCS oriented geochemistry. * Status of active student geochemical and geomechancal modeling projects.

33

Project Title:  

Broader source: Energy.gov (indexed) [DOE]

Repair flowline 61-66-SX-3 Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY # 291 Project Information Date: 3/1 1/2010 Contractor Code: Project Overview In order to repair this line it was decided to trench a line aproximately 100 feet and tie it into the line at 71-3- 1. What are the environmental sx-3. This will get us out of the old flow line which has been repaired 5-6 times. this will mitigate the chances impacts? of having spills in the future. 2. What is the legal location? This flowline runs from the well77-s-1 0 to the B-2-10 manifold.+ "/-,~?X3 3. What is the duration of the project? Approximately 10 hours(1 day) to complete 4. What major equipment will be used backhoe and operator and one hand if any (work over rig. drilling rig.

34

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Co-Sequestration Co-Sequestration Studies Project Number 58159 Task 2 B. Peter McGrail Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 and mixed gas storage capacity in various geologic settings - Demonstrate fate of injected mixed gases * Project benefits statement:

35

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Model Complexity in Geological Carbon Model Complexity in Geological Carbon Sequestration: A Design of Experiment (DoE) & Response Surface (RS) Uncertainty Analysis Project Number: DE-FE-0009238 Mingkan Zhang 1 , Ye Zhang 1 , Peter Lichtner 2 1. Dept. of Geology & Geophysics, University of Wyoming, Laramie, Wyoming 2. OFM Research, Inc., Santa Fe, New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project major goals and benefits; * Detailed project objectives & success criteria; * Accomplishments to date; * Summary of results; * Appendix (organization chart; Gantt chart; additional results). Dept. of Geology & Geophysics, University of Wyoming

36

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Region Region DE-FE0001812 Brian J. McPherson University of Utah U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Acknowledgements * NETL * Shell * Tri-State * Trapper Mining * State of Colorado 3 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 4 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 5 Benefit to the Program Program Goals Being Addressed by this Project

37

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring Geological CO Monitoring Geological CO 2 Sequestration using Perfluorocarbon and Stable Isotope Tracers Project Number FEAA-045 Tommy J. Phelps and David R. Cole* Oak Ridge National Laboratory Phone: 865-574-7290 email: phelpstj@ornl.gov (*The Ohio State University) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Developing the Technologies and Building the Infrastructure for CO 2 Storage August 22, 2013 2 Project Overview: Goals and Objectives Goal: Develop methods to interrogate subsurface for improved CO 2 sequestration, field test characterization and MVA, demonstrate CO 2 remains in zone, and tech transfer. Objectives: 1. Assessment of injections in field. PFT gas tracers are analyzed by GC-ECD to

38

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Acknowledgments Dave Harris, Kentucky Geological Survey Dave Barnes, Western Michigan University John Rupp, Indiana Geological Survey Scott Marsteller, Schlumberger Carbon Services John McBride, Brigham Young University * Project is funded by the U.S. Department of Energy through the National Energy Technology Laboratory (NETL) and by a cost share agreement with the Illinois Department of Commerce and Economic Opportunity, Office of Coal Development through the Illinois Clean Coal Institute * ConocoPhillips: in-kind match * Western Kentucky Carbon Storage Foundation: matching funding * SeisRes 2020, Houston: VSP acquisition and processing

39

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to Analyze Spatial and Temporal to Analyze Spatial and Temporal Heterogeneities in Reservoir and Seal Petrology, Mineralogy, and Geochemistry: Implications for CO 2 Sequestration Prediction, Simulation, and Monitoring Project Number DE-FE0001852 Dr. Brenda B. Bowen Purdue University (now at the University of Utah) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction to the project * Tasks * Student training * Student research successes * Lessons learned and future plans 3 Benefit to the Program * Addresses Carbon Storage Program major goals: - Develop technologies that will support industries' ability to predict CO

40

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Results from Simulation Project Results from Simulation Framework for Regional Geologic CO 2 Storage Infrastructure along Arches Province of Midwest United States DOE Award No. DE-FE0001034 Ohio Dept. of Dev. Grant CDO/D-10-03 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting August 21-23, 2012 Joel Sminchak and Neeraj Gupta Battelle Energy Systems sminchak@battelle.org, 614-424-7392 gupta@battelle.org, 614-424-3820 BUSINESS SENSITIVE 2 Presentation Outline 1. Technical Status 2. Background (CO 2 Sources, Geologic Setting) 3. Injection Well history 4. Geocellular Model Development 5. Geological Data (Geological dataset, Geostatistics) 6. Geocellular porosity/permeability model development 7. Pipeline Routing Analysis

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SECARB Anthropogenic Test: SECARB Anthropogenic Test: CO 2 Capture/Transportation/Storage Project # DE-FC26-05NT42590 Jerry Hill, Southern Sates Energy Board Richard A. Esposito, Southern Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - CO 2 Capture - CO 2 Transportation - CO 2 Storage * Accomplishments to Date * Organization Chart * Gantt Chart * Bibliography * Summary Benefit to the Program 1. Predict storage capacities within +/- 30% * Conducted high resolution reservoir characterization of the Paluxy saline formation key

42

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Investigation of the CO Investigation of the CO 2 Sequestration in Depleted Shale Gas Formations Project Number DE-FE-0004731 Jennifer Wilcox, Tony Kovscek, Mark Zoback Stanford University, School of Earth Sciences U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Project Benefits * Technical Status * Imaging at mm- to micron-scales using CT - Permeability measurements and application of the Klinkenberg effect - Molecular Dynamics simulations for permeability and viscosity estimates * Accomplishments to Date * Summary Stanford University 3 Benefit to the Program * Carbon Storage Program major goals

43

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fidelity Computational Analysis of Fidelity Computational Analysis of CO2 Trappings at Pore-scales Project Number: DE-FE0002407 Vinod Kumar (vkumar@utep.edu) & Paul Delgado (pmdelgado2@utep.edu) University of Texas at El Paso U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Collaborators: Dr. C. Harris (Shell Oil Company/Imperial College), Dr. G. Bromhal (NETL), Dr. M. Ferer (WVU/NETL), Dr. D. Crandall (NETL-Ctr), and Dr. D. McIntyre (NETL). 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - Pore-network modeling - Conductance derivation for irregular geom. - Pore-to-CFD Computations

44

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Number (DE-FE0002056) W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary KANSAS STATE UNIVERSITY Bittersweet Energy Inc. Partners FE0002056 Devilbiss Coring Service Basic Energy Services Wellington Field Operator Industrial and Electrical Power Sources of CO 2 Southwest Kansas CO 2 -EOR Initiative Industry Partners (modeling 4 Chester/Morrowan oil fields to make CO2 ready) +drilling and seismic contractors TBN

45

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Number (DE-FE0002056) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 Brighton 1&2 2:40 August 20, 2013 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary ORGANIZATIONAL STRUCTURE Modeling CO 2 Sequestration in Saline A quifer and Depleted Oil Reservoir to Evaluate Regional CO 2 Sequestration Potential of Ozark Plateau A quifer System, South-Central Kansas Co-Principal Investigators Co-Principal Investigators Kerry D. Newell -- stratigraphy, geochemistry

46

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tracer for Tracking Permanent CO 2 Storage in Basaltic Rocks DE-FE0004847 Jennifer Hall Columbia University in the City of New York U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Conservative and Reactive Tracer Techniques * Accomplishments to Date * Summary 3 Benefit to the Program * The goal of the project is to develop and test novel geochemical tracer techniques for quantitative monitoring, verification and accounting of stored CO 2 . These techniques contribute to the Carbon Storage Program's

47

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Geotechnical Site and Geotechnical Site Investigations for the Design of a CO 2 Rich Flue Gas Direct Injection Facility Project Number DOE Grant FE0001833 Paul Metz Department of Mining & Geological Engineering University of Alaska Fairbanks U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix: Not Included in Presentation 3 Benefit to the Program * Carbon Storage Program Major Goals: - Develop technologies that will support industries' ability to

48

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Scale CO Scale CO 2 Injection and Optimization of Storage Capacity in the Southeastern United States Project Number: DE-FE0010554 George J. Koperna, Jr. Shawna Cyphers Advanced Resources International U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Program Goals * Benefits Statement * Project Overview - Goals - Objectives * Technical Status * Accomplishments to Date * Summary * Appendix USDOE/NETL Program Goals * Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop and validate technologies to ensure 99 percent storage permanence. * Develop technologies to improve reservoir storage

49

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SUMNER COUNTY, KANSAS DE-FE0006821 W. Lynn Watney, Jason Rush, Joint PIs Kansas Geological Survey The University of Kansas Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Brighton 1&2 Wednesday 8-21-13 1:10-1:35 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 2 Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Project Team DOE-NETL Contract #FE0006821 KANSAS STATE UNIVERSITY 3 L. Watney (Joint PI), J. Rush (Joint PI), J. Doveton, E. Holubnyak, M. Fazelalavi, R. Miller, D. Newell, J. Raney

50

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Seal Repair Using Seal Repair Using Nanocomposite Materials Project Number DE-FE0009562 John Stormont, Mahmoud Reda Taha University of New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Ed Matteo, Thomas Dewers Sandia National Laboratories 2 Presentation Outline * Introduction and overview * Materials synthesis * Materials testing and characterization * Annular seal system testing * Numerical simulation * Summary 3 Benefit to the Program * BENEFITS STATEMENT: The project involves the development and testing of polymer-cement nanocomposites for repairing flaws in annular wellbore seals. These materials will have superior characteristics compared to conventional

51

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wyoming: MVA Techniques for Determining Gas Transport and Caprock Integrity Project Number DE-FE0002112 PIs Drs. John Kaszuba and Kenneth Sims Virginia Marcon University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status - Results - Conclusions - Next Steps * Summary 3 Benefit to the Program * Program goal being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. - Monitoring, Verification, and Accounting (MVA). MVA technologies seek to monitor, verify, and

52

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Impact of CO Impact of CO 2 Injection on the Subsurface Microbial Community in an Illinois Basin CCS Reservoir: Integrated Student Training in Geoscience and Geomicrobiology Project Number (DEFE0002421) Dr. Yiran Dong Drs. Bruce W. Fouke, Robert A. Sanford, Stephen Marshak University of Illinois-Urbana Champaign U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Technical status * Results and discussion * Summary * Appendix 3 Benefit to the Program This research project has developed scientific, technical and institutional collaborations for the development of

53

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mohammad Piri and Felipe Pereira Mohammad Piri and Felipe Pereira University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 2013 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status o Experimentation: core-flooding and IFT/CA o Pore-scale modeling modeling * Accomplishments to Date * Summary University of Wyoming 3 Benefit to the Program * Program goal: o 'Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.' * Benefits statement: o The research project is focused on performing reservoir conditions experiments to measure steady-state relative permeabilities,

54

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MVA Tools MVA Tools Sam Clegg, Kristy Nowak-Lovato, Ron Martinez, Julianna Fessenden, Thom Rahn, & Lianjie Huang Los Alamos National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview - Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix - Organization Chart - Bibliography 3 Project Overview: Goals and Objectives * Surface MVA - Frequency Modulated Spectroscopy - Quantitatively identify CO2, H2S and CH4 seepage from geologic sequestration sites - Distinguish anthropogenic CO2 from natural CO2 emissions * CO2 carbon stable isotope measurements

55

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 BROWN 2 Presentation Outline * Benefits & overview of deriving acrylates from coupling carbon dioxide and ethylene * Chemical catalysis approach: background and battles left to fight * Experimental assessment of the viability of thermochemical acrylate production * Perspectives for the future BROWN 3 Benefit to the Program * This project identifies the critical catalyst features necessary to promote carbon dioxide coupling with ethylene to acrylate at molybdenum catalysts. This research demonstrates the viability of acrylate production

56

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 Proof-of-Feasibility of Using Wellbore Deformation as a Diagnostic Tool to Improve CO2 Sequestration DE FE0004542 Larry Murdoch, Clemson University Stephen Moysey, Clemson University Leonid Germanovich, Georgia Tech Cem Ozan, Baker Hughes Sihyun Kim, Georgia Tech Glenn Skawski, Clemson University Alex Hanna, Clemson University Johnathan Ebenhack, Clemson University Josh Smith, Clemson University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Proof-of-Feasibility of Using Wellbore Deformation as a Diagnostic Tool, Larry Murdoch Project Review Meeting, 23 Aug. 2013 2 Presentation Outline * Preliminaries

57

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DE-FE0001836: DE-FE0001836: Numerical modeling of geomechanical processes related to CO 2 injection within generic reservoirs Andreas Eckert & Runar Nygaard Missouri University of Science & Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Objectives, Benefits and Outcomes * Technical status: Project summary - Teaching - Reservoir scale (Geomechanics & Fluid flow simulation) - Borehole scale (Wellbore integrity & wellbore trajectory planning) * Conclusions * Appendix 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

58

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DE-FE0002225: DE-FE0002225: Actualistic and geochemical modeling of reservoir rock, CO 2 and formation fluid interaction, Citronelle oil field, Alabama West Virginia University & University of Alabama Presenter: Dr. Amy Weislogel (WVU) Co-PI: Dr. Rona Donahoe (UA) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits * Overview & Project Map * Reservoir Geochemical Characterization * Formation Fluid Geochemistry * Geochemical Modeling * Summary 3 Benefit to the Program * Develop technologies that will support industries'

59

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Investigating the Fundamental Investigating the Fundamental Scientific Issues Affecting the Long-term Geologic Storage of Carbon Dioxide Project Number DE-FE0000397 Lee H Spangler Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Computational tool development * Laboratory studies to understand subsurface CO 2 behavior * Analog studies to inform risk analysis * Near surface detection technologies / testing * Mitigation method development 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

60

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FE/NETL CTS Cost Models and FE/NETL CTS Cost Models and Benefits Assessment of Carbon Storage R&D Program David Morgan Benefits Division Office of Program Planning and Analysis National Energy Technology Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 OFFICE OF FOSSIL ENERGY 2 Presentation Outline * Overview of benefits assessment * Overview of FE/NETL models used to assess benefits of CO 2 capture and storage * Benefits evaluation of Storage Program's R&D projects using a model to estimate costs of CO 2 storage in a saline aquifer * Description of model used to estimate costs of

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline * Benefit to the program * Project overview: Why 14 C for MVA? * Technical status: Cartridges, injections, lasers * Summary * Organizational chart * Collaborators 3 Benefit to the Program * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Permanent storage of CO 2 can be demonstrated by adding carbon-14 ( 14 C) prior to injection. This research project aims to demonstrate this by tagging fossil CO 2 with 14 C at a field site. When completed, this system will show that 14 C can be a safe and effective tracer for sequestered CO 2 . A laser-based 14 C measurement method is being adapted for continuous monitoring. This technology contributes to the Carbon Storage Program's effort of ensuring 99 percent

62

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Leakage Pathways and Leakage Pathways and Mineralization within Caprocks for Geologic Storage of CO 2 Project DE-FC26-0xNT4 FE0001786 James P. Evans Utah State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits * Goals and Objectives * Relationship to overall program goals * Overview of seal bypass * Technical status; bypass systems - Field based studies - Technological advances * Accomplishments and Summary * Appendices 3 Benefit to the Program * Program goals addressed * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.

63

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Michael G. Waddell Earth Sciences and Resources Institute University of South Carolina U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 2 Presentation Outline * Project goals and benefits * Overview of the geology of the South Georgia Rift basin in SC * Results of petrographic and core analysis from the Rizer #1 * Future investigations in the SGR * Summary 3 Benefit to the Program Program Goals: * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected

64

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Micro-Structured Sapphire Fiber Sensors for Micro-Structured Sapphire Fiber Sensors for Simultaneous Measurements of High-T and Dynamic Gas Pressure in Harsh Environments DE-FE0001127 Investigators: Hai Xiao, Hai-Lung Tsai, Missouri University of Science and Technology Junhang Dong, University of Cincinnati Program Manager: Norm Popkie, Gasification Division, NETL DOE Project Kickoff Meeting in the NETL Pittsburgh December 15, 2009 Outline * Background * Objectives * Project Elements * Management Plan * Research Plan and Approaches * Risk Management * Summary Background * Demands: High-performance, reliable, in situ sensors are highly demanded for advanced process control and lifecycle management in existing and future advanced power and fuel systems - Improved efficiency/safety/reliability/availability/maintainability

65

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mart Oostrom Mart Oostrom Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline  Project overview  Sub-Task 1: Investigation of CO 2 migration in heterogeneous porous media  Sub-Task 2: Modeling CCUS deployment in China  Summary Collaboration with China on Clean Energy Research 3 Benefit to the Program The Clean Energy Partnership was established by a memorandum of understanding between the Chinese Academy of Sciences, the National Energy Technology Laboratory and the Pacific Northwest National Laboratory in May of 2009 with the goal of significantly reducing the environmental emissions and improving the efficiency of

66

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Evaluation of Evaluation of Geophysical Methods for Monitoring and Tracking CO 2 Migration in the Subsurface PI: Jeffrey Daniels Co-PI: Robert Burns & Franklin Schwartz Students: Michael Murphy & Kyle Shalek The Ohio State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 FOA Number: DE-FOA-0000032 NETL Award Number: DE-FE0002441 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 3 Benefit to the Program * Program Goal: Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones

67

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

capillary trapping (FE0004956), Bryant, UT-Austin capillary trapping (FE0004956), Bryant, UT-Austin Influence of Local Capillary Trapping on Containment System Effectiveness DE-FE0004956 Steven Bryant The University of Texas at Austin U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Local capillary trapping (FE0004956), Bryant, UT-Austin Local capillary trapping (FE0004956), Bryant, UT-Austin 2 Presentation Outline * Motivation and relevance to Program * Project goals * Technical status * Accomplishments * Summary * Future plans Local capillary trapping (FE0004956), Bryant, UT-Austin Local capillary trapping (FE0004956), Bryant, UT-Austin

68

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Brian Turk Research Triangle Institute U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and objectives * Carbon gasification * Carbon reactivity studies * Catalyst development * Techno-economic analysis * Summary 3 Benefit to the Program * Program goal: Reduce CO 2 emissions by developing beneficial uses that meet the DOE net cost metric of $10/MT for captured CO 2 that will mitigate CO 2 emissions in areas where geological storage may not be an optimal solution * Benefits statement: Development of a commercial process for converting CO 2 and a carbon source into a commodity chemical at a

69

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improved Caprock Integrity and Improved Caprock Integrity and Risk Assessment Techniques Project Number (FE0009168) Michael Bruno, PhD, PE GeoMechanics Technologies U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Introduction and Motivation 2 A primary requirement for long-term geologic storage and containment of carbon dioxide is ensuring caprock integrity. Large-scale CO2 injection requires improved and advanced simulation tools and risk assessment techniques to better predict and help control system failures, and to enhance performance of geologic storage. GeoMechanics Technologies is developing enhanced simulation and risk analysis approaches to assess and

70

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive Monitoring and Uncertainty Assessment of CO 2 Plume Migration DOE-FE0004962 Steven Bryant The University of Texas at Austin U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin 2 Presentation Outline * Motivation and relevance to Program * Project goals * Technical status * Accomplishments * Summary * Future plans Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin

71

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Basin-Scale Leakage Risks from Basin-Scale Leakage Risks from Geologic Carbon Sequestration: Impact on CCS Energy Market Competitiveness Catherine A. Peters Jeffery P. Fitts Michael A. Celia Princeton University Paul D. Kalb Vatsal Bhatt Brookhaven National Laboratory Elizabeth J. Wilson Jeffrey M. Bielicki Melisa Pollak University of Minnesota DOE Award DE-FE0000749 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to CCUS research program * Project Goals & Objectives * Technical Status  Thrust I - Reservoir-scale simulations of leakage potential with permeability evolution

72

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for Modeling CO for Modeling CO 2 Processes: Pressure Management, Basin-Scale Models, Model Comparison, and Stochastic Inversion ESD09-056 Jens T. Birkholzer with Abdullah Cihan, Marco Bianchi, Quanlin Zhou, Xiaoyi Liu, Sumit Mukhopadhyay, Dorothee Rebscher, Barbara Fialeix Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview and Technical Status - Task 1: Optimization of Brine Extraction for Pressure Management and Mitigation - Task 2: Basin-scale Simulation of CO 2 Storage in the Northern Plains - Prairie Basal Aquifer - Task 3: Sim-SEQ Model Comparison

73

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Beneficial Use of CO Beneficial Use of CO 2 in Precast Concrete Production DE-FE0004285 Yixin Shao, Yaodong Jia Liang Hu McGill University 3H Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation outline * Goals and objectives * Benefits to the program * Project overview * Technical status * Accomplishment to date * Summary 2 Objective Masonry blocks Fiber-cement panels Prefabricated buildings Concrete pipes To develop a carbonation process to replace steam curing in precast concrete production for energy reduction, and carbon storage and utilization. Goals * CO 2 sequestration capacity by cement:

74

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

University of Kansas Center for Research University of Kansas Center for Research Kansas Geological Survey U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 Presentation Outline * Benefits, objectives, overview * Methods * Background & setting * Technical status * Accomplishments * Summary Benefit to the Program * Program goal addressed: Develop technologies that will support the industries' ability to predict CO 2 storage capacity in geologic formations to within ± 30 percent. * Program goal addressed: This project will confirm - via a horizontal test boring - whether fracture attributes derived from 3-D seismic PSDM Volumetric Curvature (VC) processing are real. If

75

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Brian Turk Research Triangle Institute U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project benefits and objectives * Carbon reactivity studies * Catalyst mechanism studies * Catalyst development * Test results * Summary 3 Benefit to the Program * Program goal: Reduce CO 2 emissions by developing beneficial uses that meet the DOE net cost metric of $10/MT for captured CO 2 that will mitigate CO 2 emissions in areas where geological storage may not be an optimal solution * Benefits statement: Development of a commercial process for converting CO 2 and a carbon source into a commodity chemical at a

76

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0-22, 2013 0-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Advanced simulation tool for quantifying transport in porous and fractured geological formations during CO 2 sequestration that includes all mechanisms: convection, diffusion, dissolution and chemical reactions * A simulator that can fully model these processes does not currently exist * Simulator will contribute to our ability to predict CO 2 storage capacity in geologic formations, to within ±30 percent 4 Project Overview: Goals and Objectives Comprehensive reservoir simulator for investigation of CO 2 non-isothermal, multiphase flow and long-term storage in

77

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Thomas J. Wolery Thomas J. Wolery Lawrence Livermore National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 LLNL-PRES-574632 2 Team Members * Roger Aines * Bill Bourcier * Tom Wolery * Tom Buscheck * Tom Wolfe (consultant) * Mike DiFilippo (consultant) * Larry Lien (Membrane Development Specialists) 3 Presentation Outline * Overview of Active CO 2 Reservoir Management (ACRM) * Subsurface Reservoir Management: Made Possible by Brine Production, Yielding Many Benefits * Brine Disposal Options - What brines are out there? - What are the treatment options? 4 Benefit to the Program * This project is identifying and evaluating

78

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

William Bourcier William Bourcier Lawrence Livermore National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Saline Aquifer Brine Production Well Brine Injection Well Chiller Pretreatment Desalination Brine Permeate To power plant or other use Storage pump CO 2 injection Concept is to extract and desalinate aquifer brines to create fresh water and space for CO 2 storage cap-rock 3 Presentation Outline * Overview, Purpose, Goals and Benefits * Technical status - Brine treatment and disposition - Reservoir management * Accomplishments * Summary and Planned work Goals and Objectives Technical Goals Potential advantages of brine

79

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Metrics for Screening CO Metrics for Screening CO 2 Utilization Processes Peter Kabatek Energy Sector Planning and Analysis (ESPA) Services / WorleyParsons U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * NETL's Carbon Storage Program * Introduction of the metrics * Review of the case study technology * Application of metrics to the case study technology * Discussion of metrics interpretation and grouping 3 NETL Carbon Storage Program * The Carbon Storage Program contains three key elements: - Infrastructure - Global Collaborations - Core Research and Development: * Monitoring, Verification and Accounting (MVA) * Geologic Storage

80

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Reservoir Simulation Model * Intelligent Leakage Detection System (ILDS) * Accomplishments * Summary Objective * Develop an in-situ CO 2 leak detection technology based on the concept of Smart Fields. - Using real-time pressure data from permanent downhole gauges to estimate the location and the rate of CO 2 leakage. CO2 Leakage(X,Y,Q) Artificial Intelligence & Data Mining Industrial Advisory Committee (IAC) * Project goes through continuous peer-review by an Industrial Review Committee. * Meetings: - November 6 th 2009 : * Conference call * Site selection criteria - November 17 th 2009: * A meeting during the Regional Carbon Sequestration Partnership Meeting in Pittsburgh

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Factors Influencing Factors Influencing CO 2 Storage Capacity and Injectivity in Eastern Gas Shales Contract No. DE-FE0004633 Michael Godec, Vice President Advanced Resources International mgodec@adv-res.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Benefits * Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefits to the Program * Program Goals Addressed - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.

82

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Training and Research Peter M. Walsh University of Alabama at Birmingham U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CCUS Pittsburgh, Pennsylvania August 21-23, 2012 DE-FE0002224 * Evaluation of the sealing capacity of caprocks serving as barriers to upward migration of CO 2 sequestered in geologic formations. * Education and training of undergraduate and graduate students, through independent research on geologic sequestration. * Education, through an advanced undergraduate/graduate level course on coal combustion and gasification, climate change, and carbon sequestration. * Simulation of CO 2 migration and trapping in storage

83

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building the Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction - Objective - Industrial Review Committee - Background * Steps Involved - Geological and Reservoir Simulation Modeling - Leakage Modeling & Real-Time Data Processing - Pattern Recognition & Intelligent Leakage Detection System (ILDS) * Accomplishments to Date * Summary Objective * Develop an in-situ CO 2 leak detection technology based on the concept of Smart Fields. - Using real-time pressure data from permanent downhole gauges to estimate the location and the rate of CO 2 leakage. Industrial Advisory Committee (IAC) * Project goes through continuous peer-review by an Industrial Review Committee. * Meetings: - November 6 th 2009 :

84

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix Introduction * Most storage modeling studies assume a discrete reservoir/caprock interface with simple (uniform) flow conditions. * We address the question of whether or not heterogeneities at the interface influence transmission of CO 2 into the caprock 3 4 Reservoir Caprock Reservoir Introduction The nature of reservoir/caprock interfaces 4 Organization 5 Peter Mozley (PD/PI) NMT Sedimentology James Evans (Co-PI) USU Structure Thomas Dewers (Co-I) Jason Heath (Staff) SNL Modeling Mark Person (Cooperating Scientist) NMT Modeling Stefan Raduha NMT Sedimentology

85

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ketzin Collaboration Ketzin Collaboration ESD-09-056 Barry Freifeld Earth Sciences Division Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and objectives * Success Criteria * Technical Status * Latest developments in Integrated Monitoring * Summary and Lessons Learned 3 Image from: www.co2ketzin.de 4 Benefit to the Program * Program goal being addressed: - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * The Ketzin collaboration leverages information gained through the mid-scale geological sequestration experiment in Ketzin, Germany.

86

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Jennifer A. Kozak, Jennifer A. Kozak, 1,2 Dr. Fritz Simeon, 2 Prof. T. Alan Hatton,* ,2 and Prof. Timothy F. Jamison* ,1 1 Department of Chemistry and 2 Department of Chemical Engineering Massachusetts Institute of Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation, Goals, Objectives * Background * Cyclic Carbonate Synthesis via Catalytic Coupling of CO 2 and Epoxides * New Catalysts and Reaction Scope * Mechanism - A New Paradigm for Activating Epoxides * Conclusions 3 Benefit to the Program * Identify the Program goals being addressed. - Develop technologies to demonstrate that 99 percent

87

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Verification and Accounting of Geologic Carbon Sequestration Using a Field Ready 14 C Isotopic Analyzer DEFE 0001116 Bruno D.V. Marino PhD CEO, Founder Planetary Emissions Management, Inc. 485 Massachusetts Ave. Cambridge, MA 02139 bruno.marino@pem-carbon.com www.pem-carbon.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Benefits of a 14 CO 2 Field Analyzer to DOE MVA Program Goals Program Goals: 99% Containment Identify/Quantify CCS Credits Direct Tracking Verification Tight/Leaky Account for Natural Baseline MVA Atmosphere MVA Groundwater Ecosystem Health, Community Safety

88

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building the Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix Introduction * Most storage modeling studies involve a caprock/reservoir interface, and assume a discrete contact with simple (uniform) flow conditions. * We address the question of whether or not heterogeneities at the interface influence transmission of CO 2 into the caprock 3 Introduction The nature of reservoir/caprock interfaces 4 Triassic-Jurassic Strata, San Rafael Swell, UT Organization 5 Peter Mozley (PD/PI) NMT Sedimentology James Evans (Co-PI) USU Structure Thomas Dewers (Co-I) Jason Heath (Staff) SNL Modeling Mark Person

89

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Verification and Verification and Accounting of Geologic Carbon Sequestration Using a Field Ready 14 C Isotopic Analyzer CCS Public Outreach: Pathway to Tradable CCS Securities DEFE 0001116 Bruno D.V. Marino PhD CEO, Founder Planetary Emissions Management, Inc. One Broadway, 14 th Floor Cambridge, MA 02142 bruno.marino@pem-carbon.com www.pem-carbon.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 All RIGHTS RESERVED © Benefits: Public Outreach CCS-MVA LINKED TRADABLE SECURITY Increase Public Confidence in CCS Increase Public involvement in CCS "Leakage Rate" Product Distinct from GHG "Credits"

90

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Geologic Geologic Characterization of the Triassic Newark Basin of Southeastern New York and Northern New Jersey (DE-FE0002352) Daniel J. Collins, PG, RG Sandia Technologies, LLC U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 * Acknowledgment: This material is based upon work supported by the Department of Energy [National Energy Technology Laboratory] under Award Number DE- FE0002352, Contract No. 18131 from the New York State Energy Research & Development Authority [NYSERDA], and "In Kind" Cost Share from Schlumberger Carbon Services, Weatherford Laboratories, National Oilwell Varco, New York State Museum, and Rutgers University.

91

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RISK ASSESSMENT AND MONITORING OF RISK ASSESSMENT AND MONITORING OF STORED CO 2 IN ORGANIC ROCKS UNDER NON- EQUILIBRIUM CONDITIONS DOE (NETL) Award Number: DE-FE0002423 Investigator: Vivak (Vik) Malhotra DOE supported undergraduate student participants: Jacob Huffstutler, Ryan Belscamper, Stephen Hofer, Kyle Flannery,, Bradley Wilson, Jamie Pfister, Jeffrey Pieper, Joshua T. Thompson, Collier Scalzitti-Sanders, and Shaun Wolfe Southern Illinois University-Carbondale Carbondale, Illinois 62901-4401 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Carbon Storage Program * Program goals being addressed: - To attempt to answer whether CO

92

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Water-Rock Interactions Water-Rock Interactions and the Integrity of Hydrodynamic Seals FWP FE-10-001 Bill Carey Los Alamos National Laboratory Los Alamos, NM U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program Goal: Ensure retention of 99% of injected CO 2 * Focus: Wellbore integrity * Approach: Use field, experimental and computational methods - Determine long-term compatibility of wellbore materials with CO 2 - Determine leakage mechanisms - Predict well performance * Benefit: The research will provide a basis for evaluating the long-term performance of wells, guide remediation

93

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

© 2012 Paulsson, Inc. (PI) Development of a 1,000 Level 3C Fiber Optic Borehole Seismic Receiver Array Applied to Carbon Sequestration DE-FE0004522 Björn N.P. Paulsson Paulsson, Inc. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 ® © 2012 Paulsson, Inc. (PI) © 2012 Paulsson, Inc. (PI) * Goals: Design, build, and test a high performance borehole seismic receiver system to allow cost effective geologic Carbon Capture and Storage (CCS) * Objectives: A: Develop technology to allow deployment of a 1,000 level drill pipe deployed 3C Fiber Optic Geophone (FOG) receiver array for deep

94

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Space Geodesy and Geochemistry Space Geodesy and Geochemistry Applied to Monitoring and Verification of Carbon Capture and Storage Award # DE-FE0002184 Peter Swart University of Miami Tim Dixon University of South Florida U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * What is the Award For? * What Research Work is being Supported? * Geochemical Research What is the Award For? * Provides Support for the Training of Two Graduate Students - Student 1: Involved in analysis of SAR images - Student 2: Involved in modeling of sub-surface geochemistry and application of models for policy decisions

95

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

fluid-driven fracture fluid-driven fracture DE-FE0002020 Joseph F. Labuz Civil Engineering University of Minnesota U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits statement * Goal, objectives * Technical status: fracture code, experimental results (poro, AE) * Accomplishments * Summary 0 50 100 150 200 250 300 350 0.00 0.05 0.10 0.15 0.20 Lateral displacement [mm] Load [kN] 0 300 600 900 1200 1500 AE events inelastic deformation peak 3 Benefit to the Program * Goal: develop technologies to predict CO2 storage capacity in geologic formations. * Benefits statement: develop 3D boundary element code & experimental techniques

96

Project Title Project Sponsor (funding agency)  

E-Print Network [OSTI]

and procedures applicable to the above project; and we confirm that the PI is eligible to apply in accordance Project Title Project Sponsor (funding agency) Declaration of Principal Investigator (PI) I certify that: I agree that my participation in the project must be in accordance with all

Saskatchewan, University of

97

Title Project Number  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Coupled HCTM Phenomena Coupled HCTM Phenomena From Pore-scale Processes to Macroscale Implications DE-FE0001826 J. Carlos Santamarina Georgia Institute of Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline Project Overview: The Proposal Accomplishments: HTCM Coupled Processes Appendices: Contact Information Schedule Bibliography Presentation Outline Project Overview: The Proposal Accomplishments: HTCM Coupled Processes Appendices: Contact Information Schedule Bibliography Relevance "Faustian bargain"? long-term CO 2 geo-storage needed (C-economy + climate change)

98

Title Project Number  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project DE-FE0001808 Novel Oxygen Carriers For Coal-Fueled Chemical Looping Combustion Western Kentucky University Presenter: Dr. Yan Cao Institute for Combustion Science and Environmental Technology February 25, 2011 Project Participants * PIs: Dr. Wei-Ping Pan Dr. Yan Cao * Students: Ms. Wen Ying (Master student) Mr. Andy Wang (Undergraduate student) Mr. Yanwen Cui (Master student) Introduction (limit - 1 slide) * Background on the project * Anticipated benefits Solid Oxygen Carriers 1. Commercially accepted kinetics - coupling and potential uncoupling (free oxygen) 2. Thermal Stability, Lower degradation, and Lower Attrition loss 3. Favored thermodynamics for pure CO 2 4. Opportunity to release of free oxygen for improvement of process kinetics;

99

Header with Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5NT42646 Zero Emissions Coal Syngas-Oxygen Turbo Machinery 5NT42646 Zero Emissions Coal Syngas-Oxygen Turbo Machinery FACT SHEET (42646) Oct. 2006 I. PROJECT PARTICIPANTS A. Siemens Power Generation, Inc. B. Florida Turbine Technologies, Inc. C. Clean Energy Systems, Inc. II. PROJECT DESCRIPTION A. Objective(s) - To develop a cost effective and highly efficient turbo machinery system that will work with an oxy-fuel combustor that generates very high temperature CO2 and steam mixture as the working fluid. After expansion of the working fluid, the CO2 is captured allowing near-zero emissions of NOx and carbon. The project will complete conceptual designs of alternate steam cycles and select one cycle for detailed design based on cost and feasibility studies. B. Relevancy - 1. Background: CES, Inc. has an operational oxy-fuel combustor that generates

100

Header with Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

42648 - Micro-Mixing Lean Premix Systems for Ultra-Low Emission 42648 - Micro-Mixing Lean Premix Systems for Ultra-Low Emission Hydrogen/Syngas Combustion 12/15/2006 FACT SHEET I. PROJECT PARTICIPANTS Parker Hannifin Corporation (Lead) Gas Turbine Fuel Systems Division, 9200 Tyler Blvd., Mentor OH 44060 PI: Dr. Adel Mansour (e-mail: amansour@parker.com, Ph.: 440-954-8171) University of California at Irvine UCI Combustion Laboratory, Irvine, CA 92617 Solar Turbines Incorporated 2200 Pacific Highway, San Diego CA 92101 II. PROJECT DESCRIPTION A. Objective(s) The overall objective of this DOE-Supported research and development program is to develop and test a next-generation, practical and scalable, high-performing, multi-point injector module for hydrogen and syngas fuels. The injector will use Parker Hannifin's

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Header with Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Shock Wave Compression rev060908, 6/14/06, rev 9/8/06 Shock Wave Compression rev060908, 6/14/06, rev 9/8/06 FACT SHEET Rampressor Shock Wave Compressor , DE-FC26-06NT42651 (Ramgen Power Systems, RPS) I. PROJECT PARTICIPANTS A. Prime Participant: Ramgen Power Systems, Inc (RPS) under cooperative Agreement DE-FC26-06NT42651 B. Sub-Award Participants: ASE Technologies (ASE), Manufacturing Resources Inc. (MRI), Geminus Technologies Development (GTD), Steve Kushnick, P.E., Alouette Technology. II. PROJECT DESCRIPTION A. Objective(s): Based on aerospace ramjet technology, Ramgen Power Systems is developing a novel more cost effective compressor concepts (air and carbon dioxide) for support of coal fueled gasification stationary power applications and for potential replacement of the compressor component in gas turbines.

102

Title Project Number  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Research 2011 Yearly Review Meeting Project DE-FE0002128 Analysis of microbial activity under a supercritical CO 2 atmosphere Massachusetts Institute of Technology Prof. Janelle Thompson, Department of Civil and Environmental Engineering February 24-26, 2011 Project Participants * Dr. Janelle Thompson, PhD, Assistant Professor, Civil and Environmental Engineering (MIT) * Dr. Hector Hernandez, PhD, Martin Luther King Postdoctoral Fellow (MIT) * Mr. Kyle Peet, doctoral student, Civil and Environmental Engineering, MIT * 2 undergraduates Janelle Hector Kyle 3 Why do microbes matter? CO 2 "trapping" mechanisms -biofilm barriers -mineralization Natural and Engineered Systems Mitchell et al, 2009 dawsonite Biofilm Barriers Biological catalysis of mineral trapping Can we recover life forms that grow in supercritical CO

103

Project Title: VIscosity Reduction Date:  

Broader source: Energy.gov (indexed) [DOE]

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

104

Sustainability Project Fund Application Form Requirements Project Title  

E-Print Network [OSTI]

Sustainability Project Fund Application Form Requirements Project Title: Budget Requested: Applicant/Project Leader: Faculty/Department: Email: Daytime Phone: Project Team: (Please include. Project Overview Project summary: · Provide a brief background, describing the project, objectives

Volesky, Bohumil

105

Project Information Form Project Title Modeling for Local Impact Analysis  

E-Print Network [OSTI]

Project Information Form Project Title Modeling for Local Impact Analysis University University Research and Educational Foundation- $48,683.00 Total Project Cost $48,683.00 Agency ID or Contract Number Project We will develop a traffic simulation model for the Los Angeles region that will allow us

California at Davis, University of

106

Proposed Start Date: Title of Project  

E-Print Network [OSTI]

Proposed Start Date: Title of Project: 1 Department:Principal Investigator(s): 1. College: Phone/ Email: 5 6 7 8 Does project involve: Human subjects? No Yes VertebrateAnimals? No Yes Radioactive understand and agree to comply with the URI policies and procedures for misconduct, conflict of interest

Rhode Island, University of

107

Critical in PROJECT TITLE COMMENTS BPA NPCC  

E-Print Network [OSTI]

PROJECT NUMBER (BiOp Critical in Italics) PROJECT TITLE COMMENTS BPA NPCC 35019 Develop and Implement a Pilot Status and Trend Monitoring Program BPA reduced budget by $250,000 to reflect duplicate NPCC tier 2. NPCC budget reflects an assumption of a capital determination for some components; BPA has

108

Project Title: Thematic Analysis of Forensic  

E-Print Network [OSTI]

Project Title: Thematic Analysis of Forensic Service Whanau/family Booklet Bachelor of Arts Application Deadline: 13 February, Noon Project Description: The Canterbury Regional Forensic Service (http' and their families' journey through the Forensic Service. The data has already been transcribed but needs in

Hickman, Mark

109

Project Title: Thematic Analysis of Forensic  

E-Print Network [OSTI]

Project Title: Thematic Analysis of Forensic Service Whanau/family Booklet Bachelor of Arts Application Deadline: 1 February, 2012 Project Description: The Canterbury Regional Forensic Service (http' and their families' journey through the Forensic Service. The data has already been transcribed but needs in

Hickman, Mark

110

Project Information Form Project Title Eco-Driving for Transit  

E-Print Network [OSTI]

Provided (by each agency or organization) DOT - $54,871.35 Total Project Cost $54,871.35 Agency IDProject Information Form Project Title Eco-Driving for Transit University Georgia Institute Project Second-by-second data for school buses, MARTA transit buses, and GRTA express buses

California at Davis, University of

111

RECIPIENT:Chesterfield County PROJECT TITLE: EECBG Lighting Retrofit  

Broader source: Energy.gov (indexed) [DOE]

Chesterfield County Chesterfield County PROJECT TITLE: EECBG Lighting Retrofit Page 1 of2 STATE: VA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000013 DE-EE0000874 GFO-0000874-001 0 Based 011 my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution;

112

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Broader source: Energy.gov (indexed) [DOE]

New power Line for new generator at ten sleep New power Line for new generator at ten sleep Dat e: 12114/10 DOE Code: Contractor Code: Project Lead: Mike Preston Project Overview 1. Brief project description (include Extend 3 phase power line from (existing) pole 99 to the Ten Sleep location for a new generator. The anything that could impact the transformer bank at the WDF will be dismantled, the line extended overhead, across 5 new power poles, to environment) the Ten Sleep Battery and the bank will be reassembled there. The new guy anchor at pole 99 will be located outside Palustrine wetlands. The line will be 34.5/19.920 KV, approximately 1,200 feet in length. 2. Legal location Ground disturbance will be minimal and have very little potential to affect the environment. 3. Duration of the project

113

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Broader source: Energy.gov (indexed) [DOE]

Dig d~ch from 24-51-5TX-1 0 to 24-AX-10 and reinstall electrical wire Dig d~ch from 24-51-5TX-1 0 to 24-AX-10 and reinstall electrical wire Date: 12120/2010 DOE Coda: Contractor Coda: Project Lead: Marcus Bruckner Project Overview 1 Dig ditch from 24-51-8TX-1 0 to 24-AX-10 and remove and replace electrical wire {N 2.7o') 1. Brief project desalptlon Pnclude anything that oould impact the 2. 24-51-5TX-10 and 24-AX-10 (SW r.tN 10TOWNSHIP 38 NORTH RANGE 78WEST) environment] 2. Leg allocation 3. 1 day 3. Duration of the project 4. Major equipment to be used 4. Backhoe The table below is to be completed by the Project Leed and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and contact the Technical Assurance Department.

114

Project title: Principal Investigator(s)  

E-Print Network [OSTI]

No. 0123 Project title: Principal Investigator(s): Funding Agency: Submission deadline: Instruments, redeployment costs) OBS engineering and technical support cost: (on shore and at sea) Shipping: Travel and technical support for OBS operations at sea. The cost of providing this support (e.g., instrument charges

Menke, William

115

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Broader source: Energy.gov (indexed) [DOE]

Reclamation of Pits and Boxes Reclamation of Pits and Boxes Date: Nov. 11 , 2010 DOE Code: 6740.010.00000 Contractor Code: 8067-451 Project Lead: Anthony Bowler Project Overview 1. Brief project description [include anything that Reclamation of Q!!]y the following Pits and Boxes : 1. T-2-11 could impact the environment) 2. B-1-10 Pit 2. Legal location 3. B-1-3 Pit 3. Duration of the project 4. T .Q-3 Concrete Sump Box 4. Major equipment to be used 5. B-2-10 Skim Box 6. B-1-14 Skim Box 7. 66-1-StX-14 Pit 8. T-5-10 Pit 9. WDFSkim Box 10. WDFUpperPit 11 . WDFLowerPit 12. B-1-3 Skim Box 13. T-3-3 Skim Box 14. T-1-20 Pit 15. T-2-34 Pit (A) 16. T-2-34 Pit (B) 17. B-1 -10 Skim Box 18. Carwash Skim Box 19. 5~1-SX-3-Madison Water Valve Box from 57-WX-3 20. T-5-3 Pit

116

NEPA COMPLIANCE SURVEY J.-1{p Project Information Project Title:  

Broader source: Energy.gov (indexed) [DOE]

}:- }:- J.-1{p Project Information Project Title: Flowline leak @ 68-66-SX-34 Date: 1/26/2010 DOE Code: Contractor Code: Project Lead: Jeff Jones Project Overview 011..- 1. What are the environmental Elimination of the flowline@ 68-66- SX-34. Dig up and locate leak. Take p ntaminated soil to land fann and impacts? record in log book. The duration of this project will be approx. 4-days. The equipment to be used is as follows backhoe, and welder. We will be eliminating the flowline and pumping to a tank set on location.So we don't 2. What is the legal location? have any leaks in the Mure. 3. What is the duration of the project? 4. What major equipment will be used if any (work over rig, drilling rig, etc.)? The table below Is to be completed by the Project Lead and nwlewed by the Environmental Specialist and the DOE NEPA

117

BEACON SOLAR ENERGY PROJECT (08-AFC-2) Project Title: Beacon Solar Energy Project (Beacon)  

E-Print Network [OSTI]

BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Project Title: Beacon Solar Energy Project and operate the Beacon Solar Energy Project (Beacon). Location: The project is located in eastern Kern County;BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Licensing: The Beacon project would have a nominal

118

Geothermal: Sponsored by OSTI -- Project Title: Small Scale Electrical...  

Office of Scientific and Technical Information (OSTI)

Project Title: Small Scale Electrical Power Generation from Heat Co-Produced in Geothermal Fluids: Mining Operation Geothermal Technologies Legacy Collection HelpFAQ | Site Map |...

119

Project Project Funding Operational & Maintenance Costs Univ. Project Title GSF Brief Description of Project Location Amount Source  

E-Print Network [OSTI]

Project Project Funding Operational & Maintenance Costs Univ. Project Title GSF Brief Description of Project Location Amount Source UF Minor Projects for UF 50,000 Minor projects for facilities located and education. Typical projects consist of Gainesville/ Typical projects other funding greenhouses, general

Slatton, Clint

120

Independence) PROJECT TITLE: Clinton Community Human Service Campus Project  

Broader source: Energy.gov (indexed) [DOE]

Area Substance Abuse Council, Inc (a SEP subrecipient of the Iowa Office of Energy STATE: IA Area Substance Abuse Council, Inc (a SEP subrecipient of the Iowa Office of Energy STATE: IA Independence) PROJECT TITLE: Clinton Community Human Service Campus Project Page 1 of2 Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE FOA 000052 EE0000162 GFO-0000162-015 EE162 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Project Information Form Project Title Urban Spatial Structure and GHG Emissions  

E-Print Network [OSTI]

Project Information Form Project Title Urban Spatial Structure and GHG Emissions University UC specified GHG reduction targets. This requires clear evidence that links from urban spatial structure

California at Davis, University of

122

Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project -Compliance  

E-Print Network [OSTI]

DOCKETED Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project - Compliance TN schedule and procedures necessary to conclude the amendment review process. At the Prehearing Conference

123

Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project -Compliance  

E-Print Network [OSTI]

DOCKETED Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project - Compliance TN-700-2009-004.PDF #12;2 Notice of Committee's Intention to Use Informal Hearing Procedures Pursuant

124

Project ID: 35011 Title: The Floating Net Pen Transportation System Pilot Project  

E-Print Network [OSTI]

Project ID: 35011 Title: The Floating Net Pen Transportation System Pilot Project Sponsor: Columbia. Principal goals are to assess survival and straying at adulthood. Net pens are proposed as a low cost

125

Project Information Form Project Title Assessment of Critical Barriers to Alternative and Renewable Fuel and  

E-Print Network [OSTI]

Project Information Form Project Title Assessment of Critical Barriers to Alternative and Renewable Fuel and Vehicle Deployment University UC Davis Principal Investigator Amy Jaffe Andrew Burke PI models are necessary to promote adequate investment in promising alternative vehicle technologies

California at Davis, University of

126

Project Information Form Project Title Integrating Management of Truck and Rail Systems in Los Angeles  

E-Print Network [OSTI]

Project Information Form Project Title Integrating Management of Truck and Rail Systems in Los or organization) Volvo Research and Educational Foundation- $79,604.00 Total Project Cost $79,604.00 Agency ID of Research Project This project will develop models to optimize the balance of freight demand across rail

California at Davis, University of

127

Project Information Form Project Title Spatial Dynamics of the Logistics Industry and Implications for Freight  

E-Print Network [OSTI]

or organization) Caltrans $50,000 Total Project Cost $50,000 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title Spatial Dynamics of the Logistics Industry and Implications and End Dates August 15, 2014 to August 14 2015 Brief Description of Research Project This project

California at Davis, University of

128

Name Title of Project Site Supervisor and  

E-Print Network [OSTI]

in Yolo County's Department of Public Health Hoa Tan, Program Director, Emergency Preparedness, Yolo Community Health Assessment Project Jill Cook, MS, RN, PHN, Director of Health, Yolo County Health Department 500 Jefferson Blvd. West Sacramento, CA 95691 (916) 375-6380 jill.cook@yolo county.org BK Yoo, MD

Leistikow, Bruce N.

129

Project Information Form Project Title White Paper on Climate Adaptation for State DOTs and Local Agencies  

E-Print Network [OSTI]

Project Information Form Project Title White Paper on Climate Adaptation for State DOTs and Local each agency or organization) DOT $30,000 Total Project Cost $30,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates January 2014 to December 2014 Brief Description of Research Project

California at Davis, University of

130

Project Information Form Project Title White Paper on The application of permeable pavement with emphasis  

E-Print Network [OSTI]

Project Information Form Project Title White Paper on The application of permeable pavement (by each agency or organization) Cal Trans Total Project Cost $29,007 Agency ID or Contract Number Project Depending on the type of surface pavement, permeable pavement can be termed as porous asphalt

California at Davis, University of

131

Project Title Improved Emission Models for Project Evaluation (MOVES-Matrix) University Georgia Institute of Technology  

E-Print Network [OSTI]

Project Title Improved Emission Models for Project Evaluation (MOVES-Matrix) University Georgia or organization) DOT - $92,292.15 Total Project Cost $92,292.15 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates November 2013 - June 2015 Brief Description of Research Project Local governments are using

California at Davis, University of

132

Project Information Form Project Title Reduction of Lifecycle Green House Gas Emissions From Road  

E-Print Network [OSTI]

Project Information Form Project Title Reduction of Lifecycle Green House Gas Emissions From Road@ucdavis.edu Funding Source(s) and Amounts Provided (by each agency or organization) US DOT $30,000 Total Project Cost Brief Description of Research Project This white paper will summarize the state of knowledge and state

California at Davis, University of

133

Project Information Form Project Title Impact of Legislative Mandates on Transportation Workforce Capacity  

E-Print Network [OSTI]

or organization) DOT $95,000 Total Project Cost $95,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and EndProject Information Form Project Title Impact of Legislative Mandates on Transportation Workforce Dates August 1, 2014 to July 31, 2015 Brief Description of Research Project The transportation industry

California at Davis, University of

134

Project Information Form Project Title Accelerating Commercialization of Alternative and Renewable Fuels and  

E-Print Network [OSTI]

or organization) CEC $344,546 Total Project Cost $344,546 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title Accelerating Commercialization of Alternative and Renewable and End Dates June 30, 2014 to June 30, 2016 Brief Description of Research Project Alternative

California at Davis, University of

135

Project Information Form Project Title Exploring Unintended Environmental and SocialEquity Consequences of  

E-Print Network [OSTI]

Source(s) and Amounts Provided (by each agency or organization) Caltrans $91,829 Total Project Cost $92Project Information Form Project Title Exploring Unintended Environmental and Social Brief Description of Research Project Communities throughout the U.S. are pursuing land use

California at Davis, University of

136

Project Information Form Project Title Using Connected Vehicle Technology for Advanced Signal Control  

E-Print Network [OSTI]

,387 Total Project Cost $59,387 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates 4/14/2014 ­ 9Project Information Form Project Title Using Connected Vehicle Technology for Advanced Signal/30/15 Brief Description of Research Project Today's conventional traffic control strategies typically rely

California at Davis, University of

137

Project Information Form Project Title Designing and Analyzing Policies for Renewable Fuels  

E-Print Network [OSTI]

or organization) US DOT $38,942 Total Project Cost $38,942 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title Designing and Analyzing Policies for Renewable Fuels and End Dates September 1, 2014 to August 31, 2015 Brief Description of Research Project Federal and state

California at Davis, University of

138

Project Information Form Project Title Designing and Analyzing Policies for Renewable Fuels  

E-Print Network [OSTI]

or organization) US DOT $38,925 Total Project Cost $38,925 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title Designing and Analyzing Policies for Renewable Fuels and End Dates September 1, 2014 to August 31, 2015 Brief Description of Research Project Federal and state

California at Davis, University of

139

Project Information Form Project Title The Role of Environmental Concerns, Lifestyles, Mobility-Related  

E-Print Network [OSTI]

(s) and Amounts Provided (by each agency or organization) Cal Trans $92,070.27 Total Project Cost $92Project Information Form Project Title The Role of Environmental Concerns, Lifestyles, Mobility Brief Description of Research Project Recent research has highlighted significant modifications

California at Davis, University of

140

Project Information Form Project Title White Paper on Performance Based Approaches to Incentivize Local Adoption of  

E-Print Network [OSTI]

Provided (by each agency or organization) Caltrans $23,385 Total Project Cost $23,385 Agency ID or ContractProject Information Form Project Title White Paper on Performance Based Approaches to Incentivize of Research Project This white paper will consider how to incentivize local government adoption of land use

California at Davis, University of

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Project Information Form Project Title Intercity Travel in Northeaster Non-metropolitan Regions: What Roles do  

E-Print Network [OSTI]

) USDOT $73,000 Total Project Cost $73,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and End DatesProject Information Form Project Title Intercity Travel in Northeaster Non-metropolitan Regions September 2014 to August 2016 Brief Description of Research Project Little is known about intercity travel

California at Davis, University of

142

Project Information Form Project Title Innovative Data Collection to Improve Transit Service Assessment  

E-Print Network [OSTI]

(s) and Amounts Provided (by each agency or organization) DOT - $102,971.57 Total Project Cost $102,971.57 AgencyProject Information Form Project Title Innovative Data Collection to Improve Transit Service of Research Project Mobile information technology will be used to compare travel behavior of populations

California at Davis, University of

143

Project Information Form Project Title Eco-Driving to Reduce Emissions Cars (Behavioral Focus)  

E-Print Network [OSTI]

Source(s) and Amounts Provided (by each agency or organization) USDOT $34,618.33 Total Project Cost $34Project Information Form Project Title Eco-Driving to Reduce Emissions ­ Cars (Behavioral Focus Description of Research Project The purpose of this review is to provide energy and environment policy makers

California at Davis, University of

144

Project Information Form Project Title Intercity Travel in Northeastern Non-metropolitan Regions: What Roles do  

E-Print Network [OSTI]

) USDOT $73,000 Total Project Cost $73,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and End DatesProject Information Form Project Title Intercity Travel in Northeastern Non-metropolitan Regions September 2014 to August 2016 Brief Description of Research Project Little is known about intercity travel

California at Davis, University of

145

Project Information Form Project Title Working toward a policy framework for reducing greenhouse gas  

E-Print Network [OSTI]

Provided (by each agency or organization) US DOT $37,874 Total Project Cost $37,874 Agency ID or ContractProject Information Form Project Title Working toward a policy framework for reducing greenhouse of Research Project This white paper is concerned with a preliminary investigation of the extent to which

California at Davis, University of

146

Project Information Form Project Title Advanced Energy Management Strategy Development for Plug-in Hybrid  

E-Print Network [OSTI]

,365 Total Project Cost $58,365 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates April 1, 2014Project Information Form Project Title Advanced Energy Management Strategy Development for Plug ­ September 30, 2015 Brief Description of Research Project Plug-in hybrid vehicles (PHEVs) have great

California at Davis, University of

147

Project Information Form Project Title White Paper of Assessing Transportation Financing Options from a Green  

E-Print Network [OSTI]

or organization) US DOT $23,700 Total Project Cost $23,700 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title White Paper of Assessing Transportation Financing Options and End Dates June 15, 2014 to August 31, 2014 Brief Description of Research Project The Highway Trust

California at Davis, University of

148

Project Information Form Project Title Program for Vehicle Regulatory Reform: Assessing Life Cycle-Based  

E-Print Network [OSTI]

,931.44 Total Project Cost $98,931.44 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates November 1Project Information Form Project Title Program for Vehicle Regulatory Reform: Assessing Life Cycle, 2014 ­ October 31, 2015 Brief Description of Research Project Current greenhouse gas emissions

California at Davis, University of

149

Project Information Form Project Title Managing Roadway Systems to Reduce GHG Emissions and Improve  

E-Print Network [OSTI]

or organization) $25,217 Total Project Cost $25,217 Agency ID or Contract Number DTRT13-G-UTC29 Start and EndProject Information Form Project Title Managing Roadway Systems to Reduce GHG Emissions and Improve Dates 4/1/14 ­ 3/30/15 Brief Description of Research Project There have been a variety of traffic

California at Davis, University of

150

Project Information Form Project Title Reducing Truck Emissions and Improving Truck Fuel Economy via ITS  

E-Print Network [OSTI]

each agency or organization) US DOT $90,000 Total Project Cost $90,000 Agency ID or Contract NumberProject Information Form Project Title Reducing Truck Emissions and Improving Truck Fuel Economy Project Currently trucks are viewed as any other vehicle in traffic management Currently trucks are viewed

California at Davis, University of

151

Project Information Form Project Title Urban Spatial Structure and GHG Emissions  

E-Print Network [OSTI]

Source(s) and Amounts Provided (by each agency or organization) Caltrans $79,375 Total Project Cost $79Project Information Form Project Title Urban Spatial Structure and GHG Emissions University USC Brief Description of Research Project The evidence on land use and travel shows that employment access

California at Davis, University of

152

Project Title and Principal Investigators FY 2014 Federal  

E-Print Network [OSTI]

Sea Grant Program Project Title and Principal Investigators FY 2014 Federal Funding * FY 2014, NY, RI, WHOI Buy Out or Build Back? A Comparative Assessment of Approaches to Employing Public Stewards Academies in Maryland (Dana R. Fisher) $69,999 $35,007 MI Development of Stable Open Channel

153

TITLE  

Office of Legacy Management (LM)

. . . . . . . . . . . . . . . -, , / AMC 000102 ( Nevada DOE/NV--1106-REV. 1 1 Environmental Restoration Project Subsurface Completion Report for Amchitka Underground Nuclear Test Sites: Long Shot, Milrow, and Cannikin Revision No.: 1 September 2006 Approved for public release: further dissemination unlimited Environmental Restoration Project U.S. Department Of Energy National Nuclear Securlty Administration Nevada Sile OMW i - Available for public sale, in p a p from: U.S. Department of Commerce National Technical Information Service 5285 Poa Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Ernail: prdtr$@ntis.gov Online ordering: htto:/hvww.n~~.~ov/ordenn~.htm Available electronically at htt~://www.osti.rov/hrid~e Available for a processing fee to U.S. Department of Energy and its contractors,

154

Project Title: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY  

Broader source: Energy.gov (indexed) [DOE]

DOE Code: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY # 258 Project lnfonnation Rewire electrical to pole at 77SHX10 Mike Preston Date: 11-19-09 Contractor Code: Project Overview No~ rea has been previously disturbed. The trenching will be th,ugh pre-existing right of way for the 1. What are the environmental ~ ~=~d ~ impacts? 2. What is the legal location? Repair a~ replacement of electrical lines to the Pole next to well at 77S~1 0. This will require trenching 3. What is the duration of the project? across the road a~ to the pole. Removing old lines and replacement of lines. 4. What major equipment will be used if any (wor1< over rig, drilling rig, 1 day etc.)? Back hole The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

155

NEPA COMPLIANCE SURVEY Project Information Project Title: Liner Drilling Date:  

Broader source: Energy.gov (indexed) [DOE]

Liner Drilling Date: Liner Drilling Date: 4-5-10 DOE Code: 71092 Cont ractor Code: 8067-766 Project Lead: Frank Ingham Project Overview Nothing out of the ordinary for drilling an existing location 1. What are the environmental impacts? NE SW Sec 21 , T39N, R78W (45-3-X-21 well) 2. What is the legal location? 3. What is the duration of the project? Approximately a week 4 . What major equipment will be used if any (work over rig, drilling rig, Drilling Rig etc.)? Will Drill out of 9 5/8 caslng with liner drillng assembly. After drilling approximately 750 to 1000 ft, will test liner hanging assembly set and retrieve multiple times. The table b elow is to be completed by the Project Lead and reviewed by the Environmental Specialis t and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey a

156

NEPA COMPLIANCE SURVEY Project Information Project Title: Express Stack Tools  

Broader source: Energy.gov (indexed) [DOE]

Express Stack Tools Express Stack Tools Date: 11/16/2010 DOE Code: 6730.020.81023 Contractor Code: 8067-971 Project Lead: Brian Black Project Overview 1) This project will test open and cased Hole logging tools in multiple wells. The tools to be testied include: 1. Brief project description [include anything that could impact the natural gamma, borehole temperature, compensated neutron, compensated density with PE, dual environment] induction/short guard, neutron prompt gamma, and acoustic televiewer tool. Radioactive sources will be run in the well as part of the toolstring. 2. Legal location 3. Duration of the project 2) 48-X-28 well location, SE %, SW %, Tsp 39N Rng 78W, Section 28; 45::3-X-21 well location, NE %, SW 4. Major equipment to be used %, Tsp 39N, Rng 78W, Section 21; 46-TpX-10 well location, NE %, SW Y.., Tsp38N, Rng 78W, Section 10.

157

Project Information Form Project Title Potential to Build Current Natural Gas Infrastructure to Accommodate  

E-Print Network [OSTI]

Project Information Form Project Title Potential to Build Current Natural Gas Infrastructure Project Natural gas is often touted as a `bridge' to low carbon fuels in the heavy duty transportation sector, and the number of natural gas-fueled medium and heavy-duty fleets is growing rapidly. Research

California at Davis, University of

158

Project Information Form Project Title Routing Strategies for Efficient Deployment of Alt. Fuel Vehicles for  

E-Print Network [OSTI]

agency or organization) US DOT $90,000 Total Project Cost $90,000 Agency ID or Contract Number DTRT13-GProject Information Form Project Title Routing Strategies for Efficient Deployment of Alt. Fuel-UTC29 Start and End Dates May 16, 2014 to May 31, 2015 Brief Description of Research Project

California at Davis, University of

159

Project Information Form Project Title Evaluation of the Combined Effect of Recycled Asphalt Pavement (RAP),  

E-Print Network [OSTI]

(s) and Amounts Provided (by each agency or organization) Caltrans $90,315 Total Project Cost $90,315 Agency IDProject Information Form Project Title Evaluation of the Combined Effect of Recycled Asphalt of Research Project As virgin material sources become increasingly scarce, and the volume of pavement material

California at Davis, University of

160

Project Information Form Project Title Environmentally Friendly Driving Feedback Systems Research and  

E-Print Network [OSTI]

Provided (by each agency or organization) Caltrans $136,000 Total Project Cost $136,000 Agency IDProject Information Form Project Title Environmentally Friendly Driving Feedback Systems Research of Research Project Among several strategies to reduce fuel consumption and greenhouse gas emissions from

California at Davis, University of

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Project Information Form Project Title Design and Analysis of Feebate Policies for Sustainable ZEV and Other  

E-Print Network [OSTI]

(s) and Amounts Provided (by each agency or organization) US DOT $36,442 Total Project Cost $36,442 Agency IDProject Information Form Project Title Design and Analysis of Feebate Policies for Sustainable ZEV of Research Project Zero-emission vehicles (ZEVs) are expected to play a critical role in decarbonizing light

California at Davis, University of

162

Project Information Form Project Title Evaluation of the Combined Effect of Recycled Asphalt Pavement (RAP),  

E-Print Network [OSTI]

(s) and Amounts Provided (by each agency or organization) Caltrans $90,538 Total Project Cost $90,538 Agency IDProject Information Form Project Title Evaluation of the Combined Effect of Recycled Asphalt of Research Project As virgin material sources become increasingly scarce, and the volume of pavement material

California at Davis, University of

163

Project Information Form Project Title Exploring Unintended Environmental and Social-Equity Consequences of  

E-Print Network [OSTI]

to simulate the effect of plans on rents, location of low income households, and travel (mode, trips, autoProject Information Form Project Title Exploring Unintended Environmental and Social and End Dates September 1, 2014 to August 31, 2015 Brief Description of Research Project Communities

California at Davis, University of

164

NEPA COMPLIANCE SURVEY Project Information Project Title: Casing Drilling Test  

Broader source: Energy.gov (indexed) [DOE]

Casing Drilling Test Casing Drilling Test Date: 5-17-201 1 DOE Code: 6730-020-72000 Contractor Code: 8067-806 Project Lead: Marl< Duletsky Project Overview 1, Brief project description ~nclude The existing 13-1-SX-23 location and entry road will be reworlproject 4. Major equipment to be used

165

Project title: Cottonwood-Roseville Optical Groundwire Project  

Broader source: Energy.gov (indexed) [DOE]

Cottonwood-Roseville Optical Groundwire Project Cottonwood-Roseville Optical Groundwire Project Requested By: Joe Oloriz Mail Code: N5706 Phone: 916-353-4773 Date Submitted: 7-3-13 Date Required: 7-8-13 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, switchyards, and facilities throughout California. Western must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. The process of marketing and delivering electric power through transmission facilities requires a great

166

Project Information Form Project Title The Development of Lifecycle Data for Hydrogen Fuel Production and  

E-Print Network [OSTI]

Project Information Form Project Title The Development of Lifecycle Data for Hydrogen Fuel will be technologies and fuels related to renewable hydrogen. The literature review will produce a set of hydrogen hydrogen or hydrogen produced with technologies or fuels not currently in the LCFS. The study will assess

California at Davis, University of

167

RECIPIENT:Bowling Green State University STATE: OH PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

', ', , , 1'.1 'Pagf;: 1 of 2 RECIPIENT:Bowling Green State University STATE: OH PROJECT TITLE: Coastal Ohio Wind Project for Reduced Barriers to Deployment of Offshore Wind Energy Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number COP DE-EE0003871 GFO-0003871-001 EE3871 Based on my review oftlle information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 45I.IA), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

168

TITLE: HVAC TESTING & BALANCING FOR MAJOR AND MINOR PROJECTS OBJECTIVE AND  

E-Print Network [OSTI]

TITLE: HVAC TESTING & BALANCING FOR MAJOR AND MINOR PROJECTS OBJECTIVE AND PURPOSE: To provide an independent test & balance for the adjustment of all HVAC systems in all major projects and minor projects

Fernandez, Eduardo

169

Title  

National Nuclear Security Administration (NNSA)

Geologic map of the Nevada Test Site, Southern Nevada. Geographic Features of NTS and upland Areas. Author Frizzell, Jr. V.A. and J. Shulters 101056 Document Date 1190 Document...

170

RECIPIENT:Utah County STATE: UT PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

Utah County STATE: UT Utah County STATE: UT PROJECT TITLE: EECBG - Utah County Energy Efficiency Retrofits Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-FOA-OOOOO13 EEOOOO889 GFO-O000889-002 EEO Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: Cx, EA, EIS APPENDIX AND NUMBER: Description: A11 Technical advice and planning assistance to international, national, state, and local organizations. A9 Information gathering (including, but not limited to, literature surveys, Inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

171

RECIPIENT:Hull Municipal Light Plant STATE: MA PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

: : Page 1 01 :L RECIPIENT:Hull Municipal Light Plant STATE: MA PROJECT TITLE: Hull Offshore Wind Research and Development Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number 09EE0000326 DE-EE0000326 GFO-OO00326-001 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the foUowing determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution; and

172

Standard Operating Procedure (SOP) for (title of project, experiment, reaction or process) Date of Preparation: ____________________________  

E-Print Network [OSTI]

Standard Operating Procedure (SOP) for (title of project, experiment, reaction or process and ensuring that this procedure is carried out: _________________________________________________ HEALTH

Sura, Philip

173

Project Information Form Project Title Bicyclist Behavior in San Francisco: A Before-and-After Study of the  

E-Print Network [OSTI]

Project Information Form Project Title Bicyclist Behavior in San Francisco: A Before(s) and Amounts Provided (by each agency or organization) Caltrans $56,707 Total Project Cost $56,707 Agency ID of Research Project Many cities in California are investing bicycle infrastructure as a way to increase

California at Davis, University of

174

Project Information Form Project Title White Paper on the Future of Passenger Travel Demand in the United  

E-Print Network [OSTI]

each agency or organization) Caltrans $26,383 Total Project Cost $26,383 Agency ID or Contract NumberProject Information Form Project Title White Paper on the Future of Passenger Travel Demand DTRT13-G-UTC29 Start and End Dates September 2014 to June 2015 Brief Description of Research Project

California at Davis, University of

175

Project Information Form Project Title Do California Highways Act as Barriers to Gene Flow for Ground-Dwelling  

E-Print Network [OSTI]

(by each agency or organization) Caltrans $78,395 Total Project Cost $78,395 Agency ID or ContractProject Information Form Project Title Do California Highways Act as Barriers to Gene Flow of Research Project Roads can act as significant barriers to wildlife dispersal, creating small fragmented

California at Davis, University of

176

Project Information Form Project Title White Paper on the Future of Passenger Travel Demand in the United  

E-Print Network [OSTI]

each agency or organization) DOT $26,383.66 Total Project Cost $26,383.66 Agency ID or Contract NumberProject Information Form Project Title White Paper on the Future of Passenger Travel Demand Project This white paper will summarize recent research findings pertaining to future passenger travel

California at Davis, University of

177

Project Information Form Project Title White Paper on the Effectiveness of Land Use and Demand Strategies in  

E-Print Network [OSTI]

DOT $12,000 Cal Trans Total Project Cost $42,533 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title White Paper on the Effectiveness of Land Use and Demand and End Dates June 30, 2014 to January 30, 2015 Brief Description of Research Project Reducing vehicle

California at Davis, University of

178

RECIPIENT:EES I PROJECT TITLE u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

EES EES I PROJECT TITLE : u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION Tennessee Energy Efficient Schools Initiative Ground Source Heat Pump Page 1 of2 ~ ~~ STATE: TN Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE·FOA-EEOOOO116 DE-EEOOO3007 GFO..QOO3007-OO3 0 Based on my review o(tbe informafioD concerning the proposed actioD, as NEPA Compliance Officer (authorized under DOE Order-451.1A),1 have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including , but nollimited 10, literature surveys, inventories, audits), data analysis (including computer modeling). document preparation (such as conceptual design or feasibility studies, analytical energy supply

179

PROJECT TITLE: EECBG u.s. DEPARIIIIENI OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

Plano Plano PROJECT TITLE: EECBG u.s. DEPARIIIIENI OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DEIERlIlINAIION Page 1 of2 STATE: TX Funding Opportunity ADDoum::tmtnt Number PrO(urtment Instrument Number NEPA Control Number em Numbu DE·FQA-OOOOQ13 DE-EE0000969 0 Based on my review orlbe information concuning the proposed action, as N[PA Compliance Officer (authorized under DOE Order 4SI.IA), I bave made the rollowing ddtnnination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits). data analysis (including computer modeling). document preparation (such as conceptual deSign or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution;

180

www.arts.canterbury.ac.nz/internships Project Title: Health, History and Digital  

E-Print Network [OSTI]

project on the history of unfree labour in the Pacific. The intern will link the database to other onlinewww.arts.canterbury.ac.nz/internships Project Title: Health, History and Digital Humanities: The project explores the health history of indentured labourers in Fiji. The intern will digitise microfilm

Hickman, Mark

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Title: CEL Solar Photovoltaic Power Project in El Salvador Principal Investigator: Abbas Ghassemi  

E-Print Network [OSTI]

Title: CEL Solar Photovoltaic Power Project in El Salvador Principal Investigator: Abbas Ghassemi solar resource, studying different technology options, anticipating performance, and evaluating the economics of the solar power technologies. The NMSU team is evaluating the potential environmental impacts

Johnson, Eric E.

182

Department of Industrial Engineering Spring 2010 Project Title: Angel Wings Bicycle Seat  

E-Print Network [OSTI]

PENNSTATE Department of Industrial Engineering Spring 2010 Project Title: Angel Wings Bicycle Seat Overview The Angel Wings Bicycle Seat is the only two padded bike seat that moves with rides with the rider

Demirel, Melik C.

183

Title I design summary report, initial tank retrieval systems, project W-211  

SciTech Connect (OSTI)

This document provides the Title I (preliminary) design for the Tank 241-SY-101 (101-SY) retrieval system. The design reflects an integrated retrieval approach for 101-SY, whereby the existing mitigation pump will be used to mix the waste and Project W-211 will provide for waste removal. The Title I Design Summary Report includes narrative and sketches that describe the technical aspect of the project, as well as updated cost and schedule baselines for the 101-SY retrieval system.

Rieck, C.A.

1995-03-01T23:59:59.000Z

184

The following National Sea Grant aquaculture research projects were awarded in FY2010-Program Investigator Investigator Affiliation Project Title  

E-Print Network [OSTI]

The following National Sea Grant aquaculture research projects were awarded in FY2010- 2011: Sea Grant College Program Investigator Investigator Affiliation Project Title FY 10-11 Federal Share* Alaska Sea Grant Eckert University of Alaska Fairbanks Red King Crab Aquaculture in Alaska - Release

185

TITLE  

Office of Legacy Management (LM)

Verification Verification Survey at B&T Metals, 425 West Town Street, Columbus, Ohio M. E. Murray V. P. Patania C. A. Johnson This report h s ken rcpmduccd directly from the t f s i avail3ble copy. Avaihble to DOE and DOE c o n m u x s from the Olficc of Scienlific and Technical inlormaliar. P.O. Boa 6 1 . W Ridsee. l X 378331: priccsav&lable from (6t5) 576-8101, TTS 6268401. A v ~ i t b I e t o h e public lmm the Naliorul Technical Inlormalion Service. U.S. Dcpvtmenl 01 Commcrcc. 5285 Pon Royal Rd.. Springlield. VA 22161. This rcpon was prep& as an account o f work sponsored by an agency o f thc Unircd Sutcs Govcmmcnr. X c i h c ~ thc Uniicd Sulcs Govcrnmcn~ nor any ;Igcncy, Lhcrcol. nor any of theu crnployccs, mikes my warmly. cxprcss, or implicd.or assumcs my legal l i i i l

186

HQ State HQ City Name of Primary Selectee Project Type Project Title and Brief Project Description  

Broader source: Energy.gov (indexed) [DOE]

Total Project Value Total Project Value Including Cost Share AZ Fort Defiance Navajo Tribal Utility Authority Company Smart Grid Workforce Training (Topic B) Navajo Tribal Utility Authority Smart Grid Workforce Training Program - Develop a workforce that is well-trained and committed to the mission of modernizing NTUA's distribution services, including an expeditious and well- built smart grid system. The training program is designed to maximize employment opportunities for citizens of the Navajo Nation located on the reservation. Arizona New Mexico $704,486 $1,408,971 $704,486 $1,408,971 Glendale Glendale Community College Developing and Enhancing Workforce Training Programs (Topic A) Southern California Utility Initiative - Expand training curricula and programs in the Southern California region. The project will raise awareness and

187

Title of Project: Scoping Data Access and Integration Needs to Facilitate Better Management of Research Innovation  

E-Print Network [OSTI]

Title of Project: Scoping Data Access and Integration Needs to Facilitate Better Management-Madison Participants: P.S. Sriraj, Paul Metaxatos, Piyushimita (Vonu) Thakuriah Status: Active Objective: This project of the intended use and value of these databases. 3. Identify existing access procedures to WisDOT databases

Illinois at Chicago, University of

188

Project Title: Reciprocal interactions between bark beetles and wildfire in subalpine forests: landscape patterns and the  

E-Print Network [OSTI]

Project Title: Reciprocal interactions between bark beetles and wildfire in subalpine forests@uwyo.edu William H. Romme Colorado State University Dept. of Forest, Rangeland, and Watershed Stewardship, Fort-Kind and Financial Contributions: $242,868 Abstract: Our project addresses Task 1 in AFP 2006-2. Wildfire and bark

Turner, Monica G.

189

Project Title: Complete System-Level Efficient and Interoperable...  

Office of Environmental Management (EM)

and architecture since a microgrid will be likely upgraded from an existing system. 2014 Smart Grid R&D Program Peer Review Project Summary 2 2014 Smart Grid R&D Program Peer...

190

Project Title: SPANA A Multimedia Tool for Learning Speech Analysis  

E-Print Network [OSTI]

valuable advice on programming techniques and useful materials on handling this project. He also took care crossing measurements, a diagram with both average energy and zero crossing rate of the speech signal

Mak, Man-Wai

191

HQ State HQ City Name of Primary Selectee Project Type Project Title and Brief Project Description  

Broader source: Energy.gov (indexed) [DOE]

Participant Participant Share Total Project Value Including Cost Share AZ Fort Defiance Navajo Tribal Utility Authority Company Smart Grid Workforce Training (Topic B) Navajo Tribal Utility Authority Smart Grid Workforce Training Program - Develop a workforce that is well-trained and committed to the mission of modernizing NTUA's distribution services, including an expeditious and well-built smart grid system. The training program is designed to maximize employment opportunities for citizens of the Navajo Nation located on the reservation. Arizona New Mexico $704,486 $704,486 $1,408,972 $704,486 $704,486 $1,408,972 Glendale Glendale Community College Developing and Enhancing Workforce Training Programs (Topic A) Southern California Utility Initiative - Expand training curricula and

192

TITLE  

Office of Legacy Management (LM)

CULTURAL RESOURCES STUDY CULTURAL RESOURCES STUDY BACKQROUND RESEARCH REPORT Off-NfS Cukural Rasowcmr Studks: Background Research for Project Shot11 Prepared by Maureen King Alvin R. McLane and William Gray Johnson MAY 1993 DESERT RESEARCH INSTITUTE CULTURAL RESOURCES STUDY BACKGROUND RESEARCH REPORT Off-NTS Cultural Resources Studies: Background Research for Project Shoal Prepared by Maureen King Alvin R. McLane and William Gray Johnson Prepared for the U.S. Department of Energy Nevada Field Office Las Vegas, Nevada This document is UNCLASSIFIED Derivative , , ::/>.: ; , . / I : Classifier - & ? " A . + - = / . /.. Desert Research Institute ate.:^^:,'& MAY 1993 The work upon which this report is based was supporred by the U.S. Department of h e r g y under Contract #DE-AC08-90NV10845

193

title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

April 21, 2003 April 21, 2003 April 21, 2003 Bakul Banerjee Bakul Banerjee Project Engineer Project Engineer MOU/SOW MOU/SOW NEU MOU and FY03 SOW are waiting for Mont's signature. SOW NEU MOU and FY03 SOW are waiting for Mont's signature. SOW contains work for three engineers. contains work for three engineers. Princeton FY03 SOW and Caltech FY03 SOW were signed in March. Princeton FY03 SOW and Caltech FY03 SOW were signed in March. Caltech FY03 SOW and MOU will be modified to include T2 Caltech FY03 SOW and MOU will be modified to include T2 operations work after UCSD and UFL MOUs are approved. operations work after UCSD and UFL MOUs are approved. UCDavis UCDavis FY03SOW was signed by Dr. Ko and waiting for FY03SOW was signed by Dr. Ko and waiting for Bauerdick

194

Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Site Map Site Map Home Publications Software Facilities Links Staff Glazing Materials Chromogenics LowE and Spectrally Selective Deposition Processes Characterization New Materials Advanced Systems Superwindows Integrated Window Systems Gas-Filled Panels Window Properties Infrared Laboratory and Traversing System MoWiTT Window+5 Development Therm Development Film Coefficients Condensation Resistance Comfort Models Field Measurements LBNL Role in NFRC Optics Database Daylighting IEA Task 21 Lightshelves/Lightpipes Tools for Daylighting Prediction Demonstrations Daylighting Controls Residential Performance Energy Star ResFen Development ECW Demonstrations Annual Energy Rating Field Tests and Monitoring Projects

195

TITLE  

Office of Legacy Management (LM)

2 Velma Avenue 2 Velma Avenue Columbus, 0h.o 4321 1-2497 6141297-2300 Fax: 297-241 1 OH I 0 HISTORICAL SOCIETY SlSCE 1885 February 23, 1996 David G. Adler, Site Manager F o m r Sites Restoration Division Department of Energy Oak Ridge Operations Office P.O. 80x 200T Oak Ridge, Tennessee 37831 -8723 Dear Mr. Adler: Re: 8 8 T Metal Building, Columbus, Ohio This is in response to your correspondence, received on February 22, 1996, regarding the project noted above. My staff has reviewed carefully the information provided. Based on the description of the proposed work and photographs provided, it is my opinion that the proposed work, if completed as proposed, will have no effect on the integrity of the B 8 T Metal building, which is eligible for the National Register of Historic Places under Criterion C. No further coordination with

196

FINAL TECHNICAL REPORT Project Title: Environmental Impacts of Wind Power Development on the Population Biology  

E-Print Network [OSTI]

Collaborative Abby Arnold, Executive Director, American Wind Wildlife Institute,aarnold@awwi.org, 202- 535-7800 (x105) Taber D. Allison, Director of Research and Evaluation, American Wind Wildlife Institutei FINAL TECHNICAL REPORT Project Title: Environmental Impacts of Wind Power Development

Sandercock, Brett K.

197

Title: Use of Physical Barriers to Prevent Borer Infestation of Apple Burrknots Project Leaders  

E-Print Network [OSTI]

Title: Use of Physical Barriers to Prevent Borer Infestation of Apple Burrknots Project Leaders of burrknot tissue on apple dwarfing rootstocks is an increasing problem throughout the northeast. One into the winter. We also discuss economic considerations. Background and Justification: Apple growers

Agnello, Arthur M.

198

TITLE  

Office of Legacy Management (LM)

Corporare Center Corporare Center f 5 1 Lalayerre Drive P.O. Box 350 Oak Ridge. Tennewt 3783 1.0350 Facsimile: 1 6 1 5 1 220.2 100 ~ o b No. 14501, FUSRAP Project DOE Contract NO. DE-AC05-9 10R2 194 9 Code: 7340/WBS: 135 U.S. Department of Energy Oak Ridge Field Office P . O . BOX 2001 Oak Ridge, Tennessee 37831-8723 Attention: David G. hdler, Site Manager , Former Sites Restoration Division subject: Hazard Assessment for Residual Contaminztion at the Former Associate Aircraft S i t e ' ( P 2 S ) Dear Mr. Adler: Based on sample results obtained a t A4S, uranium-238 concentrations above the site specific criteria (35 pCi/g) were found in a small sub-slab srsa in Section 1 of the former AAS building. The sample results of the location indicated radioactive contamination at a maximum concentration of 134 pci/g. T

199

E-Print Network 3.0 - avalieye tarahi va Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RESEARCH (PROGRAM... ) FUNDS NOT SALARIED BY VA 1. NAME: 2. DEGREE: 3. SSN: 4. VA TITLE: CONTRACT WOC INVESTIGATOR'S SIGNATURE... Table 8) Code (If code 99, enter name of...

200

E-Print Network 3.0 - annamria zskai va Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RESEARCH (PROGRAM... ) FUNDS NOT SALARIED BY VA 1. NAME: 2. DEGREE: 3. SSN: 4. VA TITLE: CONTRACT WOC INVESTIGATOR'S SIGNATURE... Table 8) Code (If code 99, enter name of...

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Project Title: Translating Solanaceae Sequence Diversity and Trait Variation into Applied Outcomes through Integrative Research, Education, and Extension  

E-Print Network [OSTI]

Project Title: Translating Solanaceae Sequence Diversity and Trait Variation into Applied Outcomes. Project Director: David Douches (douchesd@msu.edu), Michigan State University Co-Directors: Robin Buell@hort.oregonstate.edu), Oregon State University Project Website: http://solcap.msu.edu The SolCAP project was initiated September

Douches, David S.

202

Application for CALS-CCE 2013 Summer Internship Title of project: Communicating Climate Change to New Yorkers  

E-Print Network [OSTI]

Application for CALS-CCE 2013 Summer Internship Title of project: Communicating Climate Change County Project summary and intended outcomes (no more than 5-10 sentences): Cornell Climate Change): The intern will support the Cornell climate change project by working to develop outreach materials

Keinan, Alon

203

Project title: Stimulation at Desert Peak and Bradys reservoirs: modeling with the coupled THM code FEHM  

Broader source: Energy.gov [DOE]

Project title: Stimulation at Desert Peak and Bradys reservoirs: modeling with the coupled THM code FEHM presentation at the April 2013 peer review meeting held in Denver, Colorado.

204

NEPA COMPLIANCE SURVEY Project Information Project Title: South Compost Facility #2 Da  

Broader source: Energy.gov (indexed) [DOE]

South Compost Facility #2 Da South Compost Facility #2 Da te: 1-6-10 DOE Code: 6730.020.0000 Contracto r Code: 8067-788 Project Lead: Anthony Bowler Project Ove rview The purpose of the project is to build an additional compos ling facility at RMOTC to allow for 1. Bnef project description [include anything that increased soil remediation capabilities. The project will involve removing the top soil and placing could impact the environment] it adjacent to the operational area ,in a "signed" pile for reclamation . Additional scraping of the 2. Legal location area (6"-8'1 will generate material which will be used to erect a 2' berm around the location to 3. Duration of the project control runon/runoff. A perimeter fence and a locking gate will be installed around the facility's

205

Project Information Form Project Title Strategies for Transitioning to Zero-Emission Vehicles--Freight  

E-Print Network [OSTI]

,884 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates June 1, 2014 � August 15, 2014 Brief Description of Research Project According to the EIA, freight modes accounted for 29% of transportation fuel, not anticipated) Web Links Reports Project website http://ncst.ucdavis.edu/white-paper/ucd-dot-wp3-1b #12;

California at Davis, University of

206

NEPA COMPLIANCE SURVEY Project Information Project Title: T-2-33  

Broader source: Energy.gov (indexed) [DOE]

2-33 2-33 Date: 12-22-2010 DOE Code: Contractor Code: Project Lead: Bernard Winfree Project Overview 1. What are the environmental The existing manifold building will be moved off site. A backhoe will be used to dig up the manifold piping, impacts? after all possible fluids have been sucked out. Wells 88-ax-28, 17 -stx-27 and 18-stx-27 will be tied directly into the tank The remaining pipes will be cut off at the lowest point. At this time, a compos it sample of the 2. What is the legal location? surrounding soil soil will be taken . Any contaiminated soils will be hauled to the compost facility. When the 3. What is the duration of the project? samples come back under the established limits, the hole will be backfilled with native materials and the site

207

NEPA COMPLIANCE SURVEY Project Information Project Title: T-1-21 Restoration  

Broader source: Energy.gov (indexed) [DOE]

1-21 Restoration 1-21 Restoration Date: 12-22-2010 DOE Code: Contractor Code: Project Lead : Bernard Winfree Project Overview 1. What are the environmental The existing building will be removed from the site. A backhoe will be used to dig up the manifold piping, impacts? after all possible fluids have been sucked out of the piping. We will then cut off the pipes at the lowest 2. What is the legal location? possible point At this time a com posit soil sample will be taken of the area. When the samples come back under the established limits, we will backfill the hole with the existing materials and recontour the site to 3. What is the duration of the project? perexisting conditions. Reseeding will be initiated when the proper seed mix is established. This is an

208

RECIPIENT:NREL PROJECT TITLE: ESIF Excavation Soil Stockpile; NREL Tracking No. 11-013  

Broader source: Energy.gov (indexed) [DOE]

PROJECT PROJECT TITLE: ESIF Excavation Soil Stockpile; NREL Tracking No. 11-013 Page 1 of2 **...*... @-~ .. @ '"',. .. ~ STATE: CO Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number NREL-11-013 GOO Based on my review ufthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: DOE/EA· Final Supplement-II to Final Site-Wide Environmental Assessment of the National Renewable Energy Laboratory's 1440·5·11 (NREL) South Table Mountain Complex (November 2009) DOE/EA· Final Site-Site Wide Environmental Assessment of the National Renewable Energy Laboratory's (NREL) South

209

Final Project Report for project titled "Fluoroalkylphosphonic-acid-based proton conductors"  

SciTech Connect (OSTI)

The overall objective of this research was to create new proton-conducting polymer electrolytes for use in energy conversion devices including hydrogen fuel cells that could operate at high temperatures (95-130 C) and under low relative humidity (< 50% RH) conditions. The new polymers were based on the fluoroalkylphosphonic and phosphinic acid (FPA) groups (see illustration below) which offer prospects for rapid proton transport by a proton-hopping mechanism similar to that which operates in phosphoric acid, a well-known proton-transporting electrolyte that is used in a class of hydrogen fuel cells that work well under the conditions noted above and are already commercially successful. The two specific project objectives were as follows: (1) synthesize and characterize new proton-conducting electrolytes based on the fluoroalkylphosphonic and phosphinic acid (FPA) functional groups; and (2) create and apply new computer models to study protonic conduction in FPA-based electrolytes. The project was successful in creating the desired polymer electrolytes and also a series of molecular model compounds which were used to study proton transport in FPA electrolytes in general. Computer models were created to study both structure and proton-transport dynamics in the electrolytes, particularly the molecular model compounds. Rapid proton transport by a hopping mechanism was found in many of the model compounds and correlations with transport rates with molecular structure were identified. Several polymeric analogs of FPA model compounds were prepared and studied, however FPA-based polymeric materials having very high protonic conductivities under either wet or dry conditions were not obtained. Several possible reasons for the failure of polymeric materials to exhibit the expected high protonic conductivities were identified, including a failure of the polymers to adopt the phase-separated secondary structure/morphology necessary for high proton conductivity, and an unexpected polymer crosslinking effect of acidic groups having two P-OH groups. The project has lent insight into how FPA groups transport protons in both liquid and polymeric forms, which provides guidance to future efforts to design and prepare future generations of proton-conducting polymer electrolytes for hydrogen fuel cells and other types of electrochemical energy conversion and storage devices.

Stephen Creager

2011-12-08T23:59:59.000Z

210

RECIPIENT:City of Ann Arbor PROJECT TITLE: Ann Arbor Wind Generator  

Broader source: Energy.gov (indexed) [DOE]

Ann Arbor Ann Arbor PROJECT TITLE: Ann Arbor Wind Generator " ) STATE: MI Funding Opportunity Announcement Number ProcurementInstrument Number NEPA Control Number CID Number DE-EE0000447 GFO-0000447-001 0 Based on my review oCthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution; and

211

Program or Field Office: Project Title and I. D. No.: Locatio  

Broader source: Energy.gov (indexed) [DOE]

D. No.: Locatio n: U.S. Department of Energy Office of Legacy Management Categorical Exclusion Determination Form Office of Legacy Management Acid Pond Property Disposition Near the Spook, Wyoming, Disposal Site. LM # 08-12. Spook, Wyoming Proposed Action or Project Description: The Spook disposal site is located in Converse County, Wyoming, about 32 miles north of Glenrock, and is managed as a Title I Uranium Mill Tailings Radiation Control Act site. The Acid Pond Parcel located just southwest of the disposal site, also known as Vicinity Property SK-001 S, is a previously disturbed area once considered part of the original footprint of the Spook site. This parcel is not associated with current disposal site operations. DOE proposes to disposition the 5.89-

212

TITLE XVII Application Process  

Broader source: Energy.gov [DOE]

The Title XVII Innovative Clean Energy Projects (Title XVII) loan program is currently accepting applications in response to open technology-specific solicitations.

213

2012 EL Project Title and Number: Model-Based Engineering Program Title: Systems Integration for Manufacturing and Construction  

E-Print Network [OSTI]

for Manufacturing and Construction Applications Principal Investigator: Joshua Lubell, 734 Project Staff Name Josh Lubell Robert Lipman Allison Barnard Feeney Simon Frechette Chris Brown Kenway Chen Albert Jones Craig

Perkins, Richard A.

214

Project Title Mobile Device Management. Team Pam Horne, Jolene King, Jim Lehman, Marcus Lill, Terry Schroeder, David Shaw  

E-Print Network [OSTI]

Project Title Mobile Device Management. Team Pam Horne, Jolene King, Jim Lehman, Marcus Lill, Terry and supporting mobile devices that access Purdue data and information. Hypothesis We anticipate there would be several advantages from providing a model of supporting mobile devices. These advantages would be in areas

215

Project Title: Functional Measures of Sea Turtle Hearing ONR Award No: N00014-02-1-0510  

E-Print Network [OSTI]

A t Project Title: Functional Measures of Sea Turtle Hearing ONR Award No: N00014 Moein Bartol Virginia Institute ofMarine Science ABSTRACT In this study, sea turtle hearing and species and physiologically by brainstem evoked potential techniques. Sea turtles employed in this work

216

IMPEE PhD Opportunity Project title: Cyber-physical Systems (CPS) for knowledge discovery, data exploration and human factors  

E-Print Network [OSTI]

IMPEE PhD Opportunity Project title: Cyber-physical Systems (CPS) for knowledge discovery, data exploration and human factors research Supervisor(s): T. Lim, J.M. Ritchie Abstract CPS is an engineering/augmented/mixed reality spaces. R&D interests include (but not limited to): Aural or narrative guidance for product design

Greenaway, Alan

217

Project Year Project Title  

E-Print Network [OSTI]

-friendly visualization tools, such as Google Sketchup, do not enable structural analysis. This makes it extremely

Gray, Jeffrey J.

218

Communication and Collaboration Keep San Francisco VA Medical Center  

Broader source: Energy.gov (indexed) [DOE]

Communication and Collaboration Keep San Francisco VA Medical Communication and Collaboration Keep San Francisco VA Medical Center Project on Track Communication and Collaboration Keep San Francisco VA Medical Center Project on Track October 7, 2013 - 1:56pm Addthis San Francisco VA Medical Center The San Francisco VA Medical Center is saving more than $500,000 and almost 3 million kWh every year through a retrofit financed by FEMP's Super ESPC Program. Overview The Veterans Affairs Medical Center in San Francisco is saving almost 3 million kilowatt-hours of electricity, more than 70,000 therms of natural gas, and more than $500,000 annually. The energy savings are enough to power 400 homes and supply natural gas to more than 100 homes each year in California. These savings were realized by taking advantage of Super Energy

219

NEPA REVIEW SCREENING FORM DOE/CX-00088 I. Project Title: CH2f"JHill Plateau Remediation Company -  

Broader source: Energy.gov (indexed) [DOE]

10 Number: 10 Number: NEPA REVIEW SCREENING FORM DOE/CX-00088 I. Project Title: CH2f"JHill Plateau Remediation Company - Cleanup Actions, December 2012 to December 2013 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions. e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): CH2MHill Plateau Remediation Company (PRC) will be conducting cleanup actions on the Hanford Site in accordance with the categorical exclusion (CX) referenced in 10 CFR 1021, B, CX B6.1 ''Cleanup actions". PRC Projects include all those identified Sections . 3 and J.l4 of the PRC Contract, DE-AC06-08RL14788. Small-scale, short-term cleanup actions, under RCRA, Atomic Energy Act, or other

220

Virginia Energy Project | Open Energy Information  

Open Energy Info (EERE)

Logo: Virginia Energy Project Name Virginia Energy Project Place Charlottesville, Virginia Year founded 2008 Website [www.va-energy-project.com www.va-energy-project.com ] Coordinates 38.0293059°, -78.4766781° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.0293059,"lon":-78.4766781,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Project Title: Carbon cycling at the landscape scale: the effect of changes in climate and fire frequency on age distribution, stand structure, and net ecosystem production.  

E-Print Network [OSTI]

Project Title: Carbon cycling at the landscape scale: the effect of changes in climate and fire: Our project addresses Task 1 in RFP 2003-1. Climate, fire (frequency and intensity), and forest@mhub.zoology.wisc.edu, 4 Tinker@uwyo.edu Duration of Project: 3 years Annual Funding Requested from the Joint Fire Science

Turner, Monica G.

222

PROJECT TITLE: Evaluation of Seed Boot and Furrow Opener Configurations for Optimizing Seed and Fertilizer Placement in Simultaneous, Single-Pass Operations with Air Drills under  

E-Print Network [OSTI]

Hr GRC 3 PROJECT TITLE: Evaluation of Seed Boot and Furrow Opener Configurations for Optimizing-seeded into spring wheat stubble at Havre in 2002 is presented in Table 1. The `Morris Gumbo Boot' was included

Maxwell, Bruce D.

223

PI Research Organisation Project Title NE/J024678/1 Dr Christopher Davis University of Reading Driving space weather forecasts with real data  

E-Print Network [OSTI]

Lead Grant Reference PI Research Organisation Project Title NE/J024678/1 Dr Christopher Davis Troposphere and the Routing of Aircraft (EXTRA)Professor Keith Shine University of Reading NE/J023760

224

No Slide Title | Department of Energy  

Energy Savers [EERE]

No Slide Title No Slide Title No Slide Title More Documents & Publications Slide 1 Earned Value Management System (EVMS) and Project Analysis Standard Operating Procedure (EPASOP)-...

225

VA Energy Management Action Plan  

Broader source: Energy.gov (indexed) [DOE]

VA Energy Management VA Energy Management Action Plan Ken Demers Chief, VA National Energy Business Center Purpose Cited Deficiencies Within VA's Previous Energy Program... *No comprehensive Department-wide policy *Lack of coordinated acquisition and investment strategies throughout the Administrations and Staff Offices *No uniform measurement and verification of energy usage *Unverifiable reporting mechanism *Lack of capturing "lessons learned" and best practices from previous experiences Potential Annual Savings ENERGY COST ($000) CONSUMPTION (Billion Btu) Baseline - FY 2005: $397,577 Baseline - FY 2005: 29,094 Savings Savings SOURCE OF SAVINGS FY 2007 FY 2008 Future TOTAL

226

Long-Term Surveillance Plan for the Sherwood Project (UMTRCA Title II) Reclamation Cell, Wellpinit, Washington, February 2001  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Maintenance Program and Maintenance Program Long-Term Surveillance Plan for the DOE Sherwood Project (UMTRCA Title II) Reclamation Cell Wellpinit, Washington February 2001 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract Number DE-AC13-96GJ87335 Task Order Number MAC 01-06 Document Number S00204 DOE/Grand Junction Office Sherwood LTSP February 2001 Page iii Contents 1.0 Introduction............................................................................................................... 1-1 1.1 Purpose ..................................................................................................................... 1-1 1.2 Legal and Regulatory Requirements ........................................................................

227

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Are non-marine organic-rich shales suitable exploration targets?  

E-Print Network [OSTI]

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Are non-marine organic-rich shales suitable exploration targets? (EARTH-15-SR2) Host institution: University of Oxford Supervisor 1: Stuart Robinson Supervisor 2: Steve Hesselbo (University of Exeter) Project description: Shales

Henderson, Gideon

228

Project title: Phylogenetic Analysis of "New" Homeobox in the lineage leading to Humans Thehomebox genes are extremely interesting and central in the mechanisms establishing form in  

E-Print Network [OSTI]

Project title: Phylogenetic Analysis of "New" Homeobox in the lineage leading to Humans Thehomebox and challenging questions in case of fast initial progress. The core project will involve comparative genome these genes evolutionary. Peter Holland group has found 4 new genes in humans, by comparison to the mouse

Goldschmidt, Christina

229

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Evaluating the resilience of deepwater systems to recover from oil spills  

E-Print Network [OSTI]

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Evaluating the resilience of deepwater systems to recover from oil spills Host institution: Heriot-Watt University Gatliff (BGS), Jeffrey Polton (NOC), Alejandro Gallego and Eileen Bresnan (MSS). Project description: Oil

Henderson, Gideon

230

RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project and Cold War Era Historic District Treatment Plan" (DOERL-97-56); the "Cultural Resources Management Plan" (DOERL-98-10), and other applicable guidance documents and...

231

RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project and Cold War Era Historic District Treatment Plan" (DOERL-97-56; the "Cultural Resources Management Plan" (DOERL-98-10, and other applicable guidance documents and...

232

RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project and Cold War Era Historic District Treatment Plan" (DOERL-97-56); the "Cultural Resources Management Plan" (DOERL-98-10), and other applicable guidance documents and...

233

Title 16 U.S.C. 1278(a) Restrictions on Water Resources Projects...  

Open Energy Info (EERE)

not grant any license for construction of any dam, water conduit, reservoir, powerhouse, transmission line, or other project works under the Federal Power Act on or directly...

234

RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: Energy.gov (indexed) [DOE]

2, Rev 1 MSA Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.4 for Calendar Year 2014 II. Project...

235

RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 MSA Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.4 for Calendar Year 2015. II. Project...

236

RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 MSA Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.4 for Calendar Year 2014 II. Project Description...

237

RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: Energy.gov (indexed) [DOE]

7, Rev 1 MSA Annual Categorical Exclusion for Disconnection of Utilities under 10 CFR 1021, Subpart D, Appendix B, B1.27 for Calendar Year 2014 II. Project Description and Location...

238

RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 MSA Annual Categorical Exclusion for Disconnection of Utilities under 10 CFR 1021, Subpart D, Appendix B, B1.27 for Calendar Year 2015. II. Project Description and Location...

239

Project Title: Air Quality Monitoring in the Coastal Environment of Miami Professor's name: Xinrong Ren________________________________________ ______ _  

E-Print Network [OSTI]

on the campus of the Rosenstiel School of Marine and Atmospheric Science. Atmospheric pollutants include ozone in this project will learn basic knowledge of atmospheric science and air pollution, operate some environmental Ren________________________________________ ______ _ Department: Marine and Atmospheric Chemistry

Miami, University of

240

Awards Received in October 2006 Principal Investigator Department Sponsor Project Title Amount GCO OSP Number  

E-Print Network [OSTI]

OSP Number ABRUNA, HECTOR D DISALVO, FRANCIS J CCMR DOE AN ADVANCED MATERIALS APPROACH TO FUEL CELL RESEARCH PROJECT $33,025 THF 52476 BELL, JAMES F CRSR NASA (GODDARD SFC) COMPOSITION AND WEATHERING HISTORY

Danforth, Bryan Nicholas

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

VA's Performance Contracting Program Overview | Department of...  

Broader source: Energy.gov (indexed) [DOE]

VA's Performance Contracting Program Overview VA's Performance Contracting Program Overview Presentation-given at the Fall 2012 Federal Utility Partnership Working Group (FUPWG)...

242

Category:Richmond, VA | Open Energy Information  

Open Energy Info (EERE)

VA VA Jump to: navigation, search Go Back to PV Economics By Location Media in category "Richmond, VA" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Richmond VA Virginia Electric & Power Co.png SVFullServiceRestauran... 64 KB SVQuickServiceRestaurant Richmond VA Virginia Electric & Power Co.png SVQuickServiceRestaura... 64 KB SVHospital Richmond VA Virginia Electric & Power Co.png SVHospital Richmond VA... 66 KB SVLargeHotel Richmond VA Virginia Electric & Power Co.png SVLargeHotel Richmond ... 62 KB SVLargeOffice Richmond VA Virginia Electric & Power Co.png SVLargeOffice Richmond... 69 KB SVMediumOffice Richmond VA Virginia Electric & Power Co.png SVMediumOffice Richmon... 64 KB SVMidriseApartment Richmond VA Virginia Electric & Power Co.png

243

Awards Received in March 2010 Principal Investigator Department Sponsor Project Title Amount GCO OSP Number  

E-Print Network [OSTI]

FOR VISUAL REALISM IN SCALE-COMPLEX SCENES 98,337. MBF 51958 BARBASCH, DAN MATH NSF UNIPOTENT REPRESENTATIONS B SEELEY, ROBIN WEEKS, HAROLD JOHN SHOALS NSF (NSF BIO) UPGRADE OF SANITATION AND COMMUNICATION, JAMES M NAIC NSF A TECHNOLOGY DEVELOPMENT PROJECT FOR THE LARGE-N / SMALL-D SQUARE KILOMETER ARRAY

Danforth, Bryan Nicholas

244

Year Project Title USGS contact(s) Published paper, data source,  

E-Print Network [OSTI]

information Keywords 1 2003-present Delineation of brine contamination in and near the East Poplar oil field_poplar/index.html Project assesses brine contamination to the shallow aquifers and surface water. Energy Development, Williston Basin, Brine contamination, Groundwater, Surface Water, East Poplar oil field, Fort Peck Indian

Torgersen, Christian

245

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

51 Rev. l 51 Rev. l Washington River Protection Solutions LLC - Proposed Actions For CY 2013 Scheduled To Take Place Under CX 81.28, "Placing a Facility in an Environmentally Safe Condition" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions ·e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will place facilities in a cold, dark, and environmentally safe condition during Calendar Year 2013. WRPS will perform all activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & 8 to Subpart D, & CX 81.28. WRPS' facilities include all those identified in

246

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

93 Rev 0 93 Rev 0 River Protection Solutions LLC - Proposed Actions For CY 2013 Scheduled To Take Place Under CX B5.6, "Oil Spill Cleanup" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform actions to remove and cleanup oil and related contaminated materials recovered during oil spill cleanup operations during Calendar Year 2013. WRPS will perform all activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, & ex B5.6. WRPS' facilities include all those identified in the Tank Operations Contract

247

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

38, Rev 1 38, Rev 1 MSA Annual Categorical Exclusion for Electronic Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.7 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform acquisition, installation, operation, modification, and removal of electricity transmission control and monitoring devices, communication systems, data processing equipment, and similar electronic equipment. Activities include, but are not limited to, install fiber optic cable between and within existing buildings; install new conduit and/or replace old conduit; minor

248

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

2, Rev 0 2, Rev 0 MSA Annual Categorical Exclusion for Facility Safety and Environmental Improvements under 10 CFR 1021, Subpart D, Appendix B, B2.5 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform safety and environmental improvements of a facility (including, but not limited to, replacement and upgrade of facility components) that do not result in a significant change in the expected useful life, design capacity, or function of the facility and during which operations may be suspended and then resumed. Improvements include, but are not limited to, replacement/

249

RL-721 REV3 I. Project Title: NEPA REVIEW SCREENING FORM  

Broader source: Energy.gov (indexed) [DOE]

10 Number: 10 Number: DOE/CX-00051 Washington River Protection Solutions LLC - Proposed Actions For CY 2012 Scheduled To Take Place Onder CX B1.28, "Placing a Facility in an Environmentally Safe Condition" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, etc.): Washington River Protection Solutions LLC (WRPS) will place facilities in a cold, dark, and environmentally safe condition on & near the Hanford Site during Calendar Year 2012. WRPS will perform all activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, & CX B1.28. WRPS' facilities

250

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

48 Rev. 1 48 Rev. 1 Washington River Protection Solutions LLC -Proposed Actions For CY 2013 Scheduled To Take Place Under CX B1.3, "Routine Maintenance" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform routine maintenance services on buildings, structures, infrastructure and equipment during Calendar Year 2013. WRPS will perform all routine maintenance activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, and CX B1.3. WRPS' facilities include all those identified in the Tank Operations Contract Sections J.13

251

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

3, Rev 0 3, Rev 0 MSA Annual Categorical Exclusion for Site Characterization and Environmental Monitoring under 10 CFR 1021, Subpart D, Appendix B, B3.1 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform site characterization and environmental monitoring (including siting, construction, modification, operation, dismantlement, and removal of equipment). Activities would be near-surface, shallow, and in previously disturbed or developed areas; designed to conform with applicable requirements and use best management practices to limit the effects of any resultant ground disturbance.

252

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

7 Rev 0 7 Rev 0 Washington River Protection Solutions LLC Place Under CX 86.1, "Cleanup Actions" Proposed Actions For CY 2013 Scheduled To Take 11. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions- e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform small-scale, short-term cleanup actions, costing ten million or less, under the Resource Conservation & Recovery Act (RCRA), Atomic Energy Act, or other authorities as necessary to reduce risk to human health or the environment from a release or threat of release of a hazardous substance of than high-level radioactive waste and spent nuclear fuel during Calendar Year 2013. WRPS

253

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

62 Rev. 1 62 Rev. 1 Washington River Protection Solutions LLC - Proposed Actions For CY 2013 Scheduled To Take Place Onder CX B5.1, "Actions to Conserve Energy or Water" 11. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions ·e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform actions to conserve energy or water during Calendar Year 2013. WRPS will perform all activities in accordance with the cal exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, & CX 85.1. WRPS' facilities include all those identified in the Tank Operations Contract Sections J.l3 and J.l4. Activities would include, but are not limited to:

254

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

47, Rev 1 47, Rev 1 MSA Annual Categorical Exclusion for Transfer Actions under 10 CFR 1021, Subpart D, Appendix B, Bl.30 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform transfer actions, where the predominant activity is transportation, and where the receipt and storage capacity and management capability for the amount and type of materials, equipment, or waste to be moved already exists at the receiving site; and all necessary facilities and operations at the receiving site are already permitted, licensed, or approved, as appropriate. Transfers may

255

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

87 87 CH2MHill Plateau Remediation Company - Site Characterization and Environmental Monitoring, December 2012 to December 2013 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions- e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): CH2MHill Plateau Remediation (PRC) will be conducting site characterization and environmental monitoring on the Han Site in accordance with the categorical exclusion (CX) referenced in 10 CFR 102 , Appendix B, CX 83.1, ''Site characterization and environmental monitoring''. PRC ects include all those identified Sections J.l3 and J.l4 of the PRC Contract, DE-AC06-0 RL14788. Site characterization and environmental monitoring (including, but not limited to, siting,

256

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

5 5 Washington River Protection Solutions LLC - Renovation of 274-AW Under CX B2.l, "Workplace Enhancements" 11. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will renovate the 274-AW building. The 274-AW building is a 10-wide modular building located in the 200 East Area near the 241-AW and 241-AP Tank Farms. It was installed in 1993 by Eric R. Brown Construction, Inc. as a support facility for 272-AW. The facility currently serves as an office for WRPS' Base Operations managers and engineers. 274-AW is centrally located and easily accessible,

257

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

11, Rev 0 11, Rev 0 MSA Annual Categorical Exclusion for Routine Maintenance and Custodial Services under 10 CFR 1021, Subpart D, Appendix B, Bl.3 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform routine maintenance and custodial services on Hanford buildings, structures, infrastructures, and equipment in previously disturbed and developed areas. Routine maintenance and custodial services include those in MSA contract DE-AC06-09RL14728, Attachment J.3. Buildings, structures, infrastructures, and equipment subject to routine maintenance and custodial services

258

Pacific Northwest Region MAPS dataset retrospective analysis Project Title: USFS Region Six MAPS Dataset Re-analysis for the Development of Management  

E-Print Network [OSTI]

Pacific Northwest Region MAPS dataset ­ retrospective analysis Project Title: USFS Region Six MAPS Dataset Re-analysis for the Development of Management and Climate Change Support Tools for Landbird) demographic dataset may reveal how predicted patterns of climate-related forest fragmentation, pest outbreak

DeSante, David F.

259

Project Title: Reciprocal interactions between bark beetles and wildfire in subalpine forests: landscape patterns and the risk of high-severity fire.  

E-Print Network [OSTI]

1 Project Title: Reciprocal interactions between bark beetles and wildfire in subalpine forests of Wisconsin, Madison, WI Dr. William H. Romme, Colorado State University, Fort Collins, CO Dr. Philip A.firescience.gov #12;2 ABSTRACT The interactions of wildfire and bark beetle outbreaks and their reciprocal influences

Turner, Monica G.

260

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Environmental assessment of deep-water sponge fields in relation to oil and gas  

E-Print Network [OSTI]

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Environmental assessment of deep-water sponge fields in relation to oil and gas activity: a west of Shetland case study industry and government identified sponge grounds in areas of interest to the oil and gas sector

Henderson, Gideon

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

UK Oil and Gas Collaborative Doctoral Training Centre (2015 start) Project Title: Exploring the petroleum potential of a frontier province: Cretaceous stratigraphy and  

E-Print Network [OSTI]

UK Oil and Gas Collaborative Doctoral Training Centre (2015 start) Project Title: Exploring Myanmar. It has been shown that gas and oil exists in the basin and that a considerable unconventional biogenic gas system exists in the deep-waters offshore. The sediments of the Rakhine Basin were deposited

Henderson, Gideon

262

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Quantifying the role of groundwater in hydrocarbon systems using noble gas  

E-Print Network [OSTI]

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Quantifying the role of groundwater in hydrocarbon systems using noble gas isotopes (EARTH-15-CB1) Host institution biodegradation of oil can remove its value ­ but what controls the biodegradation? The deep biosphere plays a key

Henderson, Gideon

263

Program or Field Office: Project Title and I.D. No.:  

Broader source: Energy.gov (indexed) [DOE]

D. No.: D. No.: u.s. Department of Energy Office of Legacy Management Categorical Exclusion Determination Form Office of Legacy Management Routine Maintenance Activities at th e Grand Junction, Colorado, Calibration Model Facility. LM # 42-11. Location: Grand Junction , Colorado Proposed Action or Project Description: DOE proposes to conduct routine maintenance actions as needed at a facility containing calibration borehole test pits. The facility is located just behind the U.S. Department of Energy Grand Junction Office Site on land leased from the Riverview Technology Corporation . Property adjacent to the east side of the facility is owned by the Union Pacific Railroad; east of that is a City of Grand Junction municipal cemetery. Renewal of the lease generally occurs every 5 years

264

Manhattan Project: A Tentative Decision to Build the Bomb<!--Include title  

Office of Scientific and Technical Information (OSTI)

President Franklin Roosevelt's note to Vannevar Bush giving Bush the tentative go-ahead to build the atomic bomb. A TENTATIVE DECISION TO BUILD THE BOMB President Franklin Roosevelt's note to Vannevar Bush giving Bush the tentative go-ahead to build the atomic bomb. A TENTATIVE DECISION TO BUILD THE BOMB Washington, D.C.(1941-1942) Events > Early Government Support, 1939-1942 Einstein's Letter, 1939 Early Uranium Research, 1939-1941 Piles and Plutonium, 1939-1941 Reorganization and Acceleration, 1940-1941 The MAUD Report, 1941 A Tentative Decision to Build the Bomb, 1941-1942 Vannevar Bush moved swiftly to take advantage of the positive MAUD Report. Without waiting for Arthur Compton's latest committee to finish its work confirming the MAUD Committee's conclusions, Bush on October 9, 1941, met with President Franklin D. Roosevelt and Vice President Henry A. Wallace (who had been briefed on uranium research in July). Bush summarized the British findings, discussed cost and duration of a bomb project, and emphasized the uncertainty of the situation. He also received the President's permission to explore construction needs with the Army. Roosevelt instructed him to move as quickly as possible but not to go beyond research and development. Bush, then, was to find out if a bomb could be built and at what cost but not to proceed to the production stage without further presidential authorization. Roosevelt indicated that he could find a way to finance the project and asked Bush to draft a letter so that the British government could be approached "at the top.

265

Two Line Subject Title One Line Title  

Broader source: Energy.gov (indexed) [DOE]

9 9 Status Update: EPAct 2005 Title IX, Subtitle J Section 999 - Project NT42677, "Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Program Roy Long Technology Manager, EPAct 2005 Title IX, Subtitle J, Section 999 2 UDAC Update Presentation Outline * Consortium Accomplishments * UDW Program RFP Summary - 2007 - 2008 * 2009 Funding Disbursement History * 2009 Program / Process Enhancements - Contractual / GAO - Risk Mitigation / Management 3 Overall: * 3 Annual Plans completed * 15 solicitations released under 2007 R&D funding * 43 projects selected for award under 2007 solicitations - 17 Ultra-Deepwater projects - 19 Unconventional Resources projects - 7 Small Producers projects Program Accomplishments Solicitations & Awards 4 * Current Status:

266

Project Title:__________________________________________________________________ Proposal #: _____________  

E-Print Network [OSTI]

#: _____________ Company Name: Name on Card: Mailing Address: Email: Telephone: FAX: Credit Card Type: Credit Card #, and the funding expiration date. NanoFab Payment Form Dollar Amount: Exp. Date mm/yy Credit Card Payment Purchase) contact name; 2) email; 3) fax; 4) telephone; 5) company name; 6) company mailing address; 7) Tax

267

NEW IPA Received from the VA Processing IPAs with the VA  

E-Print Network [OSTI]

NEW IPA Received from the VA Processing IPAs with the VA NEW IPA Received from the VA data and contact PDRF OSR will inform DFA/Division Admin and PI that we received the IPA department for Letter of Rehire OSR will sign/return the IPA to the VA for processing DFA/DA responsibilities: OSR

Kay, Mark A.

268

Microfabrication Project Proposal Form Principle Investigator: (Person responsible for project)  

E-Print Network [OSTI]

Microfabrication Project Proposal Form Principle Investigator: (Person responsible for project: ___________________________________ Department: _____________________ _________________ __ Phone Number: _________________________ Project Information: Project Title: ________________________________________________________________ Funding Agency

269

OU Veterans Association (OU-VA) Student Handbook / Educational Benefits  

E-Print Network [OSTI]

OU Veterans Association (OU-VA) Student Handbook / Educational Benefits VA Educational Benefits://vabenefits.vba.va.gov/vonapp. Please note that OU-VA does require a copy of your application. In the event that you

Oklahoma, University of

270

Hampton Roads Demonstration Project | Open Energy Information  

Open Energy Info (EERE)

Roads Demonstration Project Roads Demonstration Project Jump to: navigation, search Name Hampton Roads Demonstration Project Facility Hampton Roads Demonstration Project Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Developer Virginia State Government Location Chesapeake Bay VA Coordinates 36.965°, -76.289° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.965,"lon":-76.289,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

271

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

An existing 13.8KV480V, 1000 kVA pad mounted transformer located on the southeast side of 105-R near the reactor ventilation stack must be relocated prior to stack demolition. The...

272

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

As a result of lightning, the 2500 kVA 13.8kV480V transformer that normally supplies power to the switchgear was damaged. The transformer repair replacement is a lengthy process...

273

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

274

VA-4-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4-B Wholesale Power Rate Schedule 4-B Wholesale Power Rate Schedule VA-4-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina served through the transmission facilities of Virginia Electric and Power Company (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download VA-4-B Rate Schedule More Documents & Publications

275

Northumberland Schools Wind Project | Open Energy Information  

Open Energy Info (EERE)

Northumberland Schools Wind Project Northumberland Schools Wind Project Jump to: navigation, search Name Northumberland Schools Wind Project Facility Northumberland Schools Sector Wind energy Facility Type Community Wind Location VA Coordinates 37.917591°, -76.473579° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.917591,"lon":-76.473579,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

276

Guide to VA Mental Health Services  

E-Print Network [OSTI]

Guide to VA Mental Health Services for Veterans and Families Keitha R Beamer, MSN: PMHCNS, BC; CARN-AP #12;The most complex and dangerous conflicts, the most harrowing operations, and the most deadly wars.va.gov/vetdata/index.asp #12;Guiding Principals · Focus on Recovery · Coordinated Care for the Whole Person · Mental Health

Hardy, Christopher R.

277

Syllabus Fall 2014 | APS 1019 Leadership in Project Management | Dr. Haig Baronikian 1 A) Title: APS1019 Leadership in Project Management  

E-Print Network [OSTI]

people and managing resources to achieve the intended project outcomes and benefits. Leadership is often, Strategy and Project Management Vision, Mission and Values! Strategic Planning and the Balanced Scorecard and Project Management 2 Organizational Culture Organizational Culture plays one of the largest roles

Prodiæ, Aleksandar

278

US SoAtl VA Site Consumption  

Gasoline and Diesel Fuel Update (EIA)

SoAtl VA SoAtl VA Site Consumption million Btu $0 $500 $1,000 $1,500 $2,000 $2,500 US SoAtl VA Expenditures dollars ALL ENERGY average per household (excl. transportation) 0 4,000 8,000 12,000 16,000 US SoAtl VA Site Consumption kilowatthours $0 $300 $600 $900 $1,200 $1,500 $1,800 US SoAtl VA Expenditures dollars ELECTRICITY ONLY average per household * Virginia households consume an average of 86 million Btu per year, about 4% less than the U.S. average. * Average electricity consumption and costs are higher for Virginia households than the national average, but similar to those in neighboring states where electricity is the most common heating fuel. * Virginia homes are typically newer and larger than homes in other parts of the country. CONSUMPTION BY END USE

279

US SoAtl VA Site Consumption  

U.S. Energy Information Administration (EIA) Indexed Site

SoAtl VA SoAtl VA Site Consumption million Btu $0 $500 $1,000 $1,500 $2,000 $2,500 US SoAtl VA Expenditures dollars ALL ENERGY average per household (excl. transportation) 0 4,000 8,000 12,000 16,000 US SoAtl VA Site Consumption kilowatthours $0 $300 $600 $900 $1,200 $1,500 $1,800 US SoAtl VA Expenditures dollars ELECTRICITY ONLY average per household * Virginia households consume an average of 86 million Btu per year, about 4% less than the U.S. average. * Average electricity consumption and costs are higher for Virginia households than the national average, but similar to those in neighboring states where electricity is the most common heating fuel. * Virginia homes are typically newer and larger than homes in other parts of the country. CONSUMPTION BY END USE

280

Category Capstone Project Title Student Names Bioengineering & Medical Devices A Point-of-Care Platform for Neonatal Complete Blood Counts  

E-Print Network [OSTI]

Project Peter Florin, Byron Pakter, Eric Scott, Brian Mick Product Design Concussion Terminator : Football Helmet Design, Analysis, Economics Meyssane Alj Hakim, Bruce Lin, Michael Liou Product Design Alo

Sekhon, Jasjeet S.

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

DOE - Office of Legacy Management -- Reynolds Metals Co - VA 04  

Office of Legacy Management (LM)

Reynolds Metals Co - VA 04 Reynolds Metals Co - VA 04 FUSRAP Considered Sites Site: REYNOLDS METALS CO. (VA.04 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Virginia-Carolina Chemical Corporation VA.04-1 Location: 818 Perry Street , Richmond , Virginia VA.04-1 Evaluation Year: 1985 VA.04-2 VA.04-3 Site Operations: Preparatory process development involving only gram quantities of uranium performed in the 1950s. VA.04-1 Site Disposition: Eliminated - Potential for contamination considered remote based on limited materials handled VA.04-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium VA.04-1 Radiological Survey(s): None Indicated VA.04-1 VA.04-4 Site Status: Eliminated from consideration under FUSRAP

282

u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

VA Dept of Mines, Minerals and Energy VA Dept of Mines, Minerals and Energy PROJECf TITLE: South Boston Landfill Energy Project Page 1 of2 ~ '«I STATE: VA I'unding Opportunity Announcement Number Procurement Instrument Number NEPA Control Numbe r em Number DE·FOA..QOOOO13 DE-EEOOOO864 0 Based on my review orlhe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SLIA),1 have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 8S.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency thai do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to Individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

283

National Ignition Facility Title II Design Plan  

SciTech Connect (OSTI)

This National Ignition Facility (NIF) Title II Design Plan defines the work to be performed by the NIF Project Team between November 1996, when the U.S. Department of Energy (DOE) reviewed Title I design and authorized the initiation of Title H design and specific long-lead procurements, and September 1998, when Title 11 design will be completed.

Kumpan, S

1997-03-01T23:59:59.000Z

284

Energy Department Recognizes City of Roanoke, VA for Leadership...  

Energy Savers [EERE]

Department Recognizes City of Roanoke, VA for Leadership in Better Buildings Challenge Energy Department Recognizes City of Roanoke, VA for Leadership in Better Buildings Challenge...

285

--No Title--  

Buildings Energy Data Book [EERE]

| Total Delivered Natural Gas 33.5% 14.9% | USPS 9.8% | Energy Consumption 0.39 Fuel Oil 7.3% 3.3% | DOE 8.2% | Total Primary Coal 5.2% 2.3% | VA 6.4% | Energy Consumption ...

286

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

287

Two Line Subject Title One Line Title  

Broader source: Energy.gov (indexed) [DOE]

UDAC Recommendations UDAC Recommendations Roy Long Technology Manager, EPAct 2005 Title IX, Subtitle J, Section 999 2 Overview of UDAC 2009 Recommendations Recommendation Areas * R&D Program Focus * Program Scope * Process * Program Progress & Value * Societal Impact 3 R&D Program Focus Area * Safety and environmental projects should be considered as separate topics. * Safety and environmental projects should be identified with specific phases of the exploration and production lifecycle. * The project impact assessment utilized in the project selection process should be made public and available to the UDAC. * Fund projects which address the overall safety impact of UDW activity. * Fund projects which address the overall environmental impact of UDW activity. * The metocean program should be strengthened regarding wind and

288

Spotsylvania Career and Tech Center Wind Project | Open Energy Information  

Open Energy Info (EERE)

Career and Tech Center Wind Project Career and Tech Center Wind Project Jump to: navigation, search Name Spotsylvania Career and Tech Center Wind Project Facility Spotsylvania Career and Tech Center Sector Wind energy Facility Type Community Wind Location VA Coordinates 38.230911°, -77.556313° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.230911,"lon":-77.556313,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

289

DOE - Office of Legacy Management -- Norfolk Naval Station - VA 05  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Norfolk Naval Station - VA 05 Norfolk Naval Station - VA 05 FUSRAP Considered Sites Site: NORFOLK NAVAL STATION (VA.05) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Norfolk , Virginia VA.05-1 Evaluation Year: 1993 VA.05-1 Site Operations: Demonstration of extinguishing a uranium fire at the Fire Fighters School for AEC contractors. VA.05-3 VA.05-2 Site Disposition: Eliminated - Potential for contamination considered remote based on the limited quantity of materials handled VA.05-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium VA.05-2 Radiological Survey(s): Yes - Health and Safety Monitoring during operations only VA.05-2 Site Status: Eliminated from consideration under FUSRAP

290

DOE - Office of Legacy Management -- Mobil Oil Corp - VA 01  

Office of Legacy Management (LM)

Mobil Oil Corp - VA 01 Mobil Oil Corp - VA 01 FUSRAP Considered Sites Site: Mobil Oil Corp. (VA.01 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: Virginia-Carolina Chemical Corporation VA.01-1 Location: 818 Perry Street , Richmond , Virginia VA.01-1 Evaluation Year: Circa 1987 VA.01-2 VA.01-3 Site Operations: Research/Development to recover Uranium as a byproduct of phosphate production; preparatory process for pilot plant scale operation at Nichols, Florida. VA.01-1 Site Disposition: Eliminated - Potential for residual radioactive contamination from small quantities of material used at the site is considered remote VA.01-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium VA.01-1

291

Grant Reference Grant Holder Research Organisation Project Title NE/I015299/1 Robert Upstill-Goddard Newcastle University Surfactant control of air-sea gas exchange in coastal waters  

E-Print Network [OSTI]

Grant Reference Grant Holder Research Organisation Project Title NE/I015299/1 Robert Upstill of Holocene Monsoon intensity from Central Asia NE/I016414/1 Michael James Lancaster University Quantifying's University of Belfast 14C as a tool to trace terrestrial carbon in a complex lake: implications for food

292

Lead Grant Reference Lead Grant RO Grant Holder Last Name, First Name Project Title NE/K000071/1 Newcastle University Mr R Gaulton Dual-wavelength laser scanning for forest health  

E-Print Network [OSTI]

Newcastle University Mr R Gaulton Dual-wavelength laser scanning for forest health monitoring. NE/K000381/1Lead Grant Reference Lead Grant RO Grant Holder Last Name, First Name Project Title NE/K000071/1 and sensory mechanisms in bat navigation NE/K000403/1 University of Southampton Dr S Watt Emplacement dynamics

293

Grant Reference Principal Investigator Research Organisation Project Title NE/J013544/1 Professor B Hubbard Aberystwyth University Extended-range optical televiewer imaging of the NEEM deep ice borehole, Greenland  

E-Print Network [OSTI]

Grant Reference Principal Investigator Research Organisation Project Title NE/J013544/1 Professor B Hubbard Aberystwyth University Extended-range optical televiewer imaging of the NEEM deep ice borehole/1 Dr A Bedford Edge Hill University Late Holocene temperature reconstruction from Hawes Water northwest

294

VA's Performance Contracting Program Overview  

Broader source: Energy.gov (indexed) [DOE]

Kristan Higgins Kristan Higgins Phyllis Stange October 17, 2012 1 Keeping our promises to veterans through sustainability OVERVIEW  Veteran - Centric  Good stewards of the taxpayers dollars.  Process is about 14 months from Agency Developed Package Award  New stream-lined process on next slide  Removed 2-3 months 2 Keeping our promises to veterans through sustainability Requirement s Package Received by NEBC; NEBC and OAEM Validate Package Phase 1 - Project Planning Assemble Acquisition Team; Engage Project Facilitator; Build RFP/NOO 6 weeks Send RFP for Technical & Legal Review Interested ESCOs respond to NOO (Can't close until legal review is complete) Technical & Legal Reviews Completed Send Invitation for Preliminary Site Survey

295

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Time: 2014-11-18 08:00:00 6456Proposal: NS-2014-6456-A PI: Paris Wiley Institution: Honeywell Corporation Title: Neutron Single Event Effects T... Start Time: 2014-11-19 08:00:00...

296

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

talks: 18 Presentation number Start time End time Presenter (if not author) First Author Remote Title Primary Task Force Area Alternate Task Force Area 101 9:30 9:37 Irby, Jim...

297

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ImageRotator.items href: 'javascript:void(0)', alt: 'Mule deer near cocooned reactor', title: 'Mule deer near cocooned reactor', image: src: 'http:www.hanford.govc.cfm...

298

--No Title--  

National Nuclear Security Administration (NNSA)

in Table 2.0. According to Title 40 CFR 61.93.(b)(4), (CFR 2002) no credit was taken for pollution control equipment in determining air emissions. The emissions for NESHAPs...

299

u.s. DEPARTMENT OF ENERGY EE RE PROJECT M ANAGEMENT CENTER NEPA DETER.1.IINATION  

Broader source: Energy.gov (indexed) [DOE]

j! .O ' .O~, j! .O ' .O~, u.s. DEPARTMENT OF ENERGY EE RE PROJECT M ANAGEMENT CENTER NEPA DETER.1.IINATION RECIPIENT:VA Department of Mines, Minerals and Energy PROJECf TITLE: EECBG - Martinsville Hydro Plant Project Page 1 of2 STATE: VA Funding Opportunity Announumcnt Number DE-FOA-OOOOO13 Procurement Instrument Number DE-EEOOOO864 NEPA Control Number em Number GFO-OOOO864-OO7 0 Based on my review of the informllition concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.IA), I have made the following determinatio n: ex, EA, EIS APPENDIX AND NUMBER: Dtscription: 8 5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency tha t do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

300

U.S. DEPARThIllN'f OF ENERGY EERE PROJECT MANAG EMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

DEPARThIllN'f OF ENERGY DEPARThIllN'f OF ENERGY EERE PROJECT MANAG EMENT CENTER NFPADETFIU.IINATION RECIPIENT:VA Dept of Mines, Minerals and Energy PROJ ECf TITLE: Mecklenburg County Landfill Energy Project Page 1 of2 STATE: VA "' unding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE·FOA-OOOOO13 DE-EEOOOO864 0 Based on my review or the information concerning the proposed action, as NEPA Compliance Officer (authori7.ed under DOE Order 4S1.1A), I have made Ihe following determination: ex, EA, EIS APPENDIX AND NUMBER: Description : B5.1 Adions to conserve energy, demonstrate potential energy conservation. and promote energy-efficiency that do not increase the indOOf concentrations of potentially harmful substances. These actions may involve financial and technical

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

u.s. DFP.'\RThIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

DFP.'\RThIENT OF ENERGY DFP.'\RThIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NFPA DFTFIU.llNATION R[CIPIENT: VA Dept of Mines, Minerals and Energy PROJECT TITLE: Goochland County Park and Ride Improvements Page I of2 STATE: VA "unding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-OOOOO13 OE-EEOOOO864 GFO-OOOO864-006 0 Based on my nview orlbe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.IA), I bave made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

302

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

303

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

304

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

305

Project Year Project Team  

E-Print Network [OSTI]

; Ian Sims, Student, Electrical and Computer Engineering, Whiting School of Engineering Project Title and Jazz Theory/Keyboard I & II. Technologies Used Digital Audio, Digital Video, Graphic Design, HTML

Gray, Jeffrey J.

306

Project Acronym AMOP Project title (in French)  

E-Print Network [OSTI]

-role on the evolution of climate (greenhouse gases production) and living resources from ecosystems to fisheries Industrial Research International cooperation International cooperation with: United States - MWN United and the worrying problem of the ocean deoxygenation due to global warming and human activities, OMZs have not been

307

TITLE PAGE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Title: Seismic and Rockphysics Diagnostics of Title: Seismic and Rockphysics Diagnostics of Multiscale Reservoir Textures Type of Report: Final Technical Reporting Start Date: April 1, 2005 Reporting End Date: June 30, 2005 Principal Investigator: Prof. Gary Mavko Date of Report: July 2005 DOE Award Number: DE-FC26-01BC15354 Submitting Organization: Stanford University, 651 Serra Street, Suite 260, Stanford, CA 94305-4125 1 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warrantee, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not

308

VA-2-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-B Wholesale Power Rate Schedule 2-B Wholesale Power Rate Schedule VA-2-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer. Document Available for Download

309

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

TRU Pad 1 Inventory. This project will provide personnel weather shelters (shelters, Mobile Mini) for personnel supporting the ARRA in E-Area while new facilities are being...

310

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

The goal of the project is to reduce the City's energy intensity and costs, and lower GHG emissions. The Technical Energy Audit (TEA) will evaluate systems, equipment and...

311

Presentation title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Department of Energy initiated effort to develop renewable energy resources and reduce GHG emissions * Develop a high level "screening tool" to identify potential projects that...

312

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

and control rights usually and customarily provided to lenders in similar project finance transactions" allows DOE, within its sole discretion and in appropriate circumstances as...

313

Recent Titles  

E-Print Network [OSTI]

Kings River Project, CA-Fre- 1441, CA-Fre-1442, CA-Fre-1443 and CA- Fre-1444, Fresno County, California.

Moratto, Michael J

1984-01-01T23:59:59.000Z

314

--No Title--  

Energy Savers [EERE]

56 DATE: June 4, 2013, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management...

315

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

an energy efficiency strategy, retaining technical services, and upgrading the HVAC system for the County of Twin Falls. OCRWM Twin Fall County Energy Efficiency Projects...

316

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

Developing an energy efficiency strategy and upgrades for multiple HVAC systems for the city of Hobbs. OCRWM Hobbs Energy Efficiency Project New Mexico Apr 9, 2010 Kathryn Knapp...

317

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

retaining technical services, conducting audits, lighting retrofits, and potential HVAC upgrades for Miles City. OCRWM Miles City Energy Efficiency Projects Montana Apr 3,...

318

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

The tribe proposes to hire an individual and provide energy audit training to create an Energy Auditor position. The project will perform energy audits for local commercial and...

319

--No Title--  

Office of Legacy Management (LM)

March 21, 2014 Re: Instrumentation and Monitoring, Rocky Flats OLF Tt Project : 114-181750 Introduction This technical memorandum provides a summary and evaluation of data...

320

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

& Controls Simulation Engineering High Performance Materials Innovative Energy Concepts Water Management R&D University Research CCSI NRAP Program Plan Project Information...

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

a project led by Joseph Oefelein of Sandia National Laboratories will study the combustion processes of internal combustion engines, helping to make vehicles more efficient, thus...

322

--No Title--  

Energy Savers [EERE]

52 DATE: May 6, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management...

323

--No Title--  

National Nuclear Security Administration (NNSA)

NUCLEAR ENERGY UNIVERSITY PROGRAMS Improved Fission Neutron Data Base for Active Interrogation of Actinides PI: Pozzi, Sara - University of Michigan Project Number: 09-414...

324

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

joined Martin Marietta Energy Systems as project coordinator for the International Thermonuclear Experimental Reactor (ITER) engineering design activities. He became the U.S. ITER...

325

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

376-1297, DeeMillikin@rl.gov Three Fuel Storage Facilities Removed from Hanford's Landscape Completion of Recovery Act Project Reduces Cleanup Footprint RICHLAND, WASH. - Gone...

326

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

and pilot projects The proposed action would involve the purchase and installation of a solar panel system on the community washeteria, a public facility with rest rooms, showers...

327

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

Develop energy efficiency and conservation strategy, 2) technical consultant, 3) revolving loan program, 4) sub grants for commercial projects, 5) energy upgrades of city...

328

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

Strategy (EECS) focuses upon the following EECBG project activities: "Technical Consultant Services" and "Energy Efficiency Retrofits" as described by the EECBG Program....

329

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

Technical consultant, 2) revolving loan program, 3) sub grants for commercial projects, 4) energy upgrades of city facilities Energy Efficiency and Conservation Block Program Hire...

330

Hacia dnde va el teatro en Cali!  

E-Print Network [OSTI]

, damas alturistas del arte caleo, lagartos de coctel y, lo mejor, muchsima gente joven. La verdad es que el foro debi llamarse Hacia dnde va el TEC? pues el colocar en la mesa central a Enrique Buenaventura sita como centro de atencin sus... posiciones y reclamas. De otra parte un foro de esta naturaleza en la ciudad de Cali es un foro al TEC, causa y efecto de los logros y dificultades del teatro local. As que el foro se enfoc hacia la "Crisis del TEC," hecho cultural sin precedentes en la...

Cajamarca Castro, Orlando

1990-10-01T23:59:59.000Z

331

U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlVllNATION  

Broader source: Energy.gov (indexed) [DOE]

DETERlVllNATION DETERlVllNATION RECIPIENT:VA Dept of Mines, Minerals and Energy PROJECT TITLE : EECBG * NEPA Template (T) Page lof2 STATE: VA Funding Opportunity Annou ncement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-OOOOO13 DE-EEOOOO864 0 Based on my review uribe information concerning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.1A), I bave made the following detennination: ex, EA, EIS APPENDIX AND NUMBER: Description: A11 Technical advice and planning assistance to international, national, state, and local organizations. A9 Information gathering (including , but not limited to, literature surveys, inventories, audits). data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

332

U.S. DEPARTIlIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

ENERGY ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT:Arlington County, VA PROJECf TITLE : EECBG * Electric Vehicle Pilot in County Fleet Page 1 of2 STATE: VA Funding Opportunity Announcement Number DE-FOA-OOOOO13 Procurement Instrument Number OE-EEOOOOB851000 NEPA Control Number em Number GFO-OOOOsas-Q02 0 Based on my review of the information conce ... ning the proposed action, as NEPA Compliance Officer (authori7.ed under DOE Order 451.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

333

GEOL 5303 Project Presentations Presenter name: ______________________________________________  

E-Print Network [OSTI]

GEOL 5303 Project Presentations Presenter name: ______________________________________________ Project title: ___________________________________________________________ Project content Superb Effective Weak Absent Introduction: What is your project topic? Presenter provides a clear introduction

Smith-Konter, Bridget

334

Presentation Title  

Broader source: Energy.gov (indexed) [DOE]

Hawaii Sustainable Energy Project - Hawaii Sustainable Energy Project - NREL Support DOE OE Smart Grid Peer Review Ben Kroposki, PhD, PE November 2-4, 2010 Innovation for Our Energy Future Innovation for Our Energy Future Hawaii Sustainable Energy Project- NREL Objective Funding Summary ($K) FY09 FY10 FY11 300K 300K 300K Technical Scope Provide technical support to Hawaii to reach goal of 70% renewable and energy efficiency Provide technical support to Lanai (MECO and C&C) to help reach goal of 100% renewable energy. Provide Kauai and KIUC with technical support regarding integration of renewable energy. Provide technical support for Hawaii in the areas of grid integration of distributed and renewable energy and smart grid applications Innovation for Our Energy Future Needs and Challenges This project addresses the Smart

335

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BioCee's thin-film coating technology. Bio- hydrocarbons will be converted into fuels by chemical catalytic processes. Advanced Research Projects Agency - Energy (ARPA-E) 25A4083...

336

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

materials, 3) bike path extension (.5 miles), 4) expand recycling program, 5) install,o solar panels on city building-panels are to be used as a demonstration project to collect...

337

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

between supercomputers and the huge data available in molecular databases like the Human Genome Project," Baudry said. "We have an avalanche of data available to us, and now we...

338

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

Replacing an HVAC system for the city of West New York OCRWM West New York Energy Efficiency Projects New Jersey Apr 9, 2010 Kathryn Knapp Digitally signed by Kathryn Knapp DN:...

339

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

engineering that evolved from their work on a DOE project that focused on developing mobile robots to work in hazardous environments. The invention won an R&D 100 Award in...

340

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Math, Science and Technology Nov. 5 at Georgia Tech in Atlanta. Under the guidance of Boyd Evans and John Mueller, ORNL biomedical engineers, Cain and Liu developed a project...

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

New conductor could provide answers for energy demand OAK RIDGE, Tenn., Nov. 7, 2002 - Oak Ridge National Laboratory and 3M Company are hoping for powerful results from a project...

342

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Track 1A: Oil & Gas Production Track 1A: Oil & Gas Production and Utilization-Overview George Guthrie Office of Research and Development National Energy Technology Laboratory Title, Date ‹#› The Need: Energy portfolio is projected to remain anchored by fossil. Sources: U.S. data from EIA, Annual Energy Outlook 2011; World data from IEA, World Energy Outlook 2010, Current Policies Scenario 79% Fossil Energy 78% Fossil Energy 84% Fossil Energy 81% Fossil Energy * Primarily traditional biomass, wood, and waste. Gas 24% Coal 21% Oil 33% Nuclear 8% Renewables 14% Gas 24% Coal 22% Oil 37% Nuclear 8% Renewables 8% Gas 21% Coal 27% Oil 33% Nuclear 6% Renewables* 13% Gas 22% Coal 29% Oil 28% Nuclear 8% Renewables* 15% + 14% + 47% Energy Demand 2008 Energy Demand 2035 World

343

Presentation Title  

Broader source: Energy.gov (indexed) [DOE]

Mexico (PNM) - PV Plus Storage for Simultaneous Voltage Smoothing and Peak Shifting Steve Willard PE Principal Investigator November 3, 2010 Funded in part by the Energy Storage Systems Program of the U.S. Department Of Energy through National Energy Technology Laboratory PNM/DOE SGDP Battery + PV Objectives * Project will co-locate a 2 - 4 MWh Advanced Lead Acid battery with a separately installed 500kW solar PV plant at a utility-owned site to create a firm, dispatchable distributed generation resource. * The project will develop broadly applicable modeling tools. These tools are being developed and used during the project to optimize the battery-system control algorithms, and ultimately will help characterize and further the understanding of feeders with storage and distributed

344

PRESENTATION TITLE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects Impacting Federal Projects Impacting Federal Power Tulsa District Dan Brueggenjohann 12 June 2013 BUILDING STRONG ®  Interpretation/Application of CERM-F-2013-18  303(d) Listing of Broken Bow Tailwaters  Interior Least Tern Operations and Habitat Creation  Tulsa Vision 2025  Dam Safety Issues ► Keystone, Pine Creek, Robert S. Kerr, Denison  Lake Eufaula Advisory Committee  Tenkiller Downstream Fishery Issues  Broken Bow Seasonal Pool Update - Cultural Resources Impacts  Arkansas River Navigation Improvement  Oklahoma Comprehensive Water Plan Update BUILDING STRONG ® Interpretation/Application of CERM-F-2013-18  Situation - New Resource Management regulation to increase the capitalization threshold for power marketing agency assets.

345

PRESENTATION TITLE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Southwestern Regional Southwestern Regional Hydropower Conference Michael Biggs, PE Chief, Reservoir Control Section Hydraulics & Technical Services Branch Little Rock District 16 June 2011 BUILDING STRONG ® White River Operations BUILDING STRONG ® Typical River Basin BUILDING STRONG ® Typical Multi Purpose Project BUILDING STRONG ® Typical River Section BUILDING STRONG ® Typical Regulating Station BUILDING STRONG ® White River Basin and Projects BUILDING STRONG ® White River System  Operated as a SYSTEM of reservoirs ► Beaver, Table Rock, Bull Shoals, Norfork are a 4-lake subsystem ► Greers Ferry ► Clearwater  "Comprehensive" system of water control regulation ► encompasses the entire White River basin ► 1 water control plan  Operation of the system is VERY COMPLEX

346

unknown title  

E-Print Network [OSTI]

AbstractThe problem of wastewater treatment in Egypt is a two-fold problem; the first part concerning the existing rural areas, the second one dealing with new industrial/domestic areas. In Egypt several agricultural projects have been initiated by the government and the private sector as well, in order to change its infrastructure. As a reliable energy source, photovoltaic pumping systems have contributed to supply water for local rural communities worldwide; they can also be implemented to solve the problem wastewater environment pollution. The solution of this problem can be categorised as recycle process. In addition, because of regional conditions past technologies are being reexamined to select a smallscale treatment system requiring low construction and maintenance costs. This paper gives the design guidelines of a Photovoltaic Small-Scale Wastewater Treatment Plant (PVSSWTP) based on technologies that can be transferred. KeywordsRenewable energy sources, Photovoltaic, small-scale projects, wastewater treatment. I I.

Photovoltaic Small-scale; Wastewater Treatment; Fadia M. A. Ghali

347

Chapter 29. The Retinal Implant Project The Retinal Implant Project  

E-Print Network [OSTI]

-04A1 VA Center for Innovative Visual Rehabilitation MOSIS provides IC fabrication at no cost ProjectChapter 29. The Retinal Implant Project 29-1 The Retinal Implant Project RLE Group Retinal Implant Drohan, Dr. William Ellersick, Oscar Mendoza Introduction to the Retinal Implant Project The Retinal

348

PROJECT REQUEST FORM PROJECT HOLDER INFORMATION  

E-Print Network [OSTI]

PROJECT REQUEST FORM Last Name: Email: PROJECT HOLDER INFORMATION UCID:Last Name: Email: Institute if different than Project Holder) First Name: Project Short Name: (50 characters max) (for eFIN view only) Project Title: PROJECT INFORMATION Start Date (MM/DD/YYYY): End Date (MM/DD/YYYY): For Questions or HELP

de Leon, Alex R.

349

Presentation title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Meeting Transmission Meeting Transmission Challenges in the Rocky Mountain Region Jeff Hein June 21, 2011 Western Renewable Energy Zones Composite photo created by NREL Presentation Outline * WREZ Vision * Chronology * WREZ Initiative Overview * Generation and Transmission Model * Lessons Learned * Future Activities National Renewable Energy Laboratory WREZ Vision * Western Governor's Association and U.S. Department of Energy initiated effort to develop renewable energy resources and reduce GHG emissions * Develop a high level "screening tool" to identify potential projects that allows industry stakeholders to analyze and compare economics of

350

PRESENTATION TITLE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

STRONG STRONG ® Projects Impacting Federal Power Tulsa District Dan Brueggenjohann 9 June 2010 BUILDING STRONG ® 303(d) Listing of Broken Bow Tailwaters Impairment Impaired Use Cadmium Fish and Wildlife Propagation - Trout Fishery Lead Fish and Wildlife Propagation - Trout Fishery Water Temperature* Fish and Wildlife Propagation - Trout Fishery The 303(d) List reports on waters identified as impaired. These waters: Have elevated portions of one or more pollutants. Do not meet one or more water quality standards. Portions of the Mountain Fork River below Broken Bow Dam are on the 2010 draft Oklahoma 303(d) list. * ODWC is currently working to implement a selective withdrawal

351

Naval Station Norfolk, VA- Energy Conservation Program UESC Partnership Success Story  

Broader source: Energy.gov (indexed) [DOE]

Station Norfolk, VA Station Norfolk, VA Energy Conservation Program UESC Partnership Success Story 20 November 2008 2 Agenda Background Basis for Success Phase I Phase I Mod 01 Phase II Other / Future Program Aspects Why the Partnership Works 3 Background Minimal structured plan for NS Norfolk prior to 2006 Other MidLant Installations had aggressive ESPC programs in place The largest US Navy Installation in the World had only scratched the surface on all the opportunities for energy conservation Decision made to establish long term UESC partnership / program with VNG 4 NS Norfolk Basis for Success Focus on long term partnership with Utility to meet infrastructure needs and energy goals Gear project efforts to support core Mission of NS Norfolk Long term benefits more important than strict

352

Case Study - The Department of Veterans Affairs West Haven Campus, VA  

Broader source: Energy.gov (indexed) [DOE]

The Department of Veterans Affairs West Haven Campus, The Department of Veterans Affairs West Haven Campus, VA Connecticut Health Care System Case Study - The Department of Veterans Affairs West Haven Campus, VA Connecticut Health Care System October 7, 2013 - 1:59pm Addthis Overview The West Haven (Connecticut) Campus of the Veterans Affairs Connecticut Health Care System was the first Veteran's Hospital to award a shared energy savings (SES) contract (now known as energy savings performance contracts). The project involves replacement of the lighting system, installation of a cooling system, maintenance of the new chiller equipment, and several smaller efforts. Up-front costs are being provided through a $3.9 million investment by the contractor, EUA Cogenex, about $400,000 in rebates from the local utilities for gas and electric service (Southern

353

SENIOR PROJECT APPROVAL FORM Submit this completed form with your Honors Senior Project  

E-Print Network [OSTI]

SENIOR PROJECT APPROVAL FORM Submit this completed form with your Honors Senior Project I. PERSONAL: _______________________________________ Classification: Junior Senior II. PROJECT INFORMATION Type of Project: Thesis Group Project Internship Creative Project Study Abroad Service Learning Project Title

Huang, Haiying

354

unknown title  

E-Print Network [OSTI]

THE GOAL OF PROJECT APOLLO, to place a man on the surfaceof the Moon and return him safely to Earth, was a task for engineering and technology. The resultant transportation system was so robust in its capability that a rich scientific harvest also was gathered in the process. The visibility and magnitude of the Apollo program left the impression, even within the scientific community,that the major lunar scientific questions had been answered. Since the Surveyor project, NASA's unmanned planetary program has ignored the Moon, preferring to concentrate its admittedly limited resources on other bodies in the solar system. In 1972,lunar scientists proposed launching a remote-sensing satellite into lunar polar orbit. Carrying a small number of geochemical and geophysical sensors,the Lunar Polar Orbiter (LBO)was designed to expand to global coverage the limited Apollo orbital science data set. Remote-sensing information from the orbiting Service Modules of Apollos 15, 16,and 17 had been invaluable in revealing the scale and extent of the planetary processes whose nature and timing were decoded in analyses of the returned samples. Low orbital inclination and limited time at the Moon resulted in tantalizingly

unknown authors

355

Title page  

Office of Legacy Management (LM)

Institutional Controls Evaluation (ICE) Report: Institutional Controls Evaluation (ICE) Report: Summary of Supporting Information for the Identification and Evaluation of Institutional Controls for the Weldon Spring Site September 2004 prepared by Environmental Assessment Division, Argonne National Laboratory prepared for U.S. Department of Energy, Office of Legacy Management, Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri, under Contract W-31-109-Eng-38 iii September 2004 CHECKLIST FOR INSTITUTIONAL CONTROL (IC) PACKAGE FOR THE WELDON SPRING SITE For identifying, evaluating, selecting the IC mechanisms for the Weldon Spring Site, the items in the checklist below are included in this report. ¥ 1. Provide maps and figures showing boundaries of the land use controls (Section 4 and

356

Main Title  

Broader source: Energy.gov (indexed) [DOE]

50 State Street, Suite 3 50 State Street, Suite 3 Montpelier, VT 05602 Phone: 802-223-8199 web: www.raponline.org Roadmap 2050: A practical guide to a prosperous, low-carbon Europe A project of the European Climate Foundation Presentation to the U.S. Department of Energy Electricity Advisory Committee Michael Hogan, Senior Advisor, RAP 12 July 2011 Month dd, yyyy The objective was to develop a fact based report - supported by key stakeholders and feeding directly into EU decision making 2 Key deliverables ▪ A set of plausible and visionary emissions pathways with an 80% reduction across the EU-27 below 1990 levels by 2050 ▪ Deep dive on the decarbonization of the power sector ▪ Implications on strategic options for the EU ▪ A related set of policy options highlighting poten-

357

Project Year Project Team  

E-Print Network [OSTI]

information systems (GIS) tools to design maps that integrate data for visualizing geographic concepts School of Engineering Project Title GIS & Introductory Geography Audience Undergraduate students on how to use the Internet for geographic research, and an interactive introduction to GIS through online

Gray, Jeffrey J.

358

Hydrogen Production and Dispensing Facility Opens at W. Va. Airport |  

Broader source: Energy.gov (indexed) [DOE]

Hydrogen Production and Dispensing Facility Opens at W. Va. Airport Hydrogen Production and Dispensing Facility Opens at W. Va. Airport Hydrogen Production and Dispensing Facility Opens at W. Va. Airport August 19, 2009 - 1:00pm Addthis Major General Allen Tackett of the National Guard's 130th Airlift Wing dispenses the first fill-up of hydrogen fuel from the Yeager facility. Major General Allen Tackett of the National Guard's 130th Airlift Wing dispenses the first fill-up of hydrogen fuel from the Yeager facility. Washington, D.C. -- A hydrogen production and dispensing station constructed and operated with support from the Office of Fossil Energy's National Energy Technology Laboratory (NETL) was officially opened Monday at the Yeager Airport in Charleston, W.Va. The facility is an example of how domestically produced fuels may be used to power a variety of vehicles

359

Leafy Biomass Gasifier for 15 kVA Diesel Genset  

Science Journals Connector (OSTI)

A 15 kVA diesel genset powered by a loose sugarcane leaves gasifier was successfully tested and long-term data ... 20-40 cm (water gage). The gasifier also produces char which is 2028% by ... . Tests conducted wi...

Anil K. Rajvanshi; Rajiv M. Jorapur

1993-01-01T23:59:59.000Z

360

Title Standards 2001  

Broader source: Energy.gov (indexed) [DOE]

Standards 2001 Standards 2001 A guide for the preparation of title evidence in land acquisitions by the United States of America. Quick links to Contents: Table of Contents / Why Title Standards 2001, and who uses it? / Evidence of title / Abstract of Title Supplemental and Supporting Title Evidence / Title Insurance Policies and Certificates of Title / Final Title Evidence Title Evidence for Condemnations / The Deed to the United States / Special Standards for Texas / Sample Forms U.S. Department of Justice Environment and Natural Resources Division Land Acquisition Section Washington, D.C. 20530 December 29, 2000 (reprint March 23, 2001) [Editor's Note: The reprint of March 23, 2001, added page numbers to the table of contents; added a new item "3" to part B of Form # 1 of the Certificate of Inspection and Possession,

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

VA UESC with PG&E  

Broader source: Energy.gov (indexed) [DOE]

Federal Utility Partnership Working Group Spring 2013: May 22-23 San Francisco, CA Hosted by: Pacific Gas and Electric Company  Review Key Challenges  Strategies Utilized to Achieve Success  Lessons Learned  Project Profile  Project Challenges  UESC Energy Saving Results  Conclusion  Facilities Targeted: ◦ 3 VAMCs and 2 clinics within VISN 21 ◦ Over 2,000,000 square feet  Project Size: $9.9 Million  Project Timeline: ◦ Business development: May 2009 ◦ Awarded: October 2011 ◦ Construction completed: July 2013 Martinez Outpatient Clinic and Community Living Center Mather VAMC San Francisco VAMC Fresno VAMC McClellan Outpatient Clinic  FEMP UESC Workshop - April 2009  Review of Existing Audits 

362

York Externally Funded Research Grants and Contracts -July 1, 2009 to December 31, 2009 Rersearcher Project Title Funder Total Funding Start Date End Date  

E-Print Network [OSTI]

of Spatial Framework to Enhance Chronic Disease Surveillance Public Health Agency of Canada $102,936 10 for an Energy Efficient Ontario SeeLine Group LTD. $10,000 11/1/2009 4/30/2010 Bebko, James Mentoring Project Conservation Authority $5,000 12/22/2009 12/31/2010 Bohr, Yvonne Parent-Infant Separation in Trans- national

363

York Externally Funded Research Grants and Contracts -January 1, 2010 to June 30, 2010 Rersearcher Project Title Funder Total Funding Start Date End Date  

E-Print Network [OSTI]

to Low Income Households and an Assessment of Their Debt Relief Options SSHRC $67,029 4/1/2010 3, Uzoamaka N Black Creek Community Capacity Building Project Delta Family Resource Centre $25,284 1 Playing Field Understanding Relative Age Effects in Sport SSHRC $100,563 4/1/2010 3/31/2013 Page 1 of 20

364

DOE - Office of Legacy Management -- Naval Proving Ground - VA 0-01  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proving Ground - VA 0-01 Proving Ground - VA 0-01 FUSRAP Considered Sites Site: NAVAL PROVING GROUND (VA.0-01 ) Eliminated from further consideration under FUSRAP - Referred to DOD Designated Name: Not Designated Alternate Name: None Location: Dahlgren , Virginia VA.0-01-1 Evaluation Year: 1987 VA.0-01-1 Site Operations: Site operations were not specified; this site was identified on the 1954 Accountable Station Lists. VA.0-01-1 VA.0-01-2 Site Disposition: Eliminated - Referred to DOD VA.0-01-1 Radioactive Materials Handled: None Indicated Primary Radioactive Materials Handled: None Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP - Referred to DOD VA.0-01-1 Also see Documents Related to NAVAL PROVING GROUND VA.0-01-1 - DOE Letter; Fiore to Schafer; Referral of DOD or Former

365

Program or Field Office: Office of Legacy Management Project Title and I.D. No.: Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida,  

Broader source: Energy.gov (indexed) [DOE]

Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida, Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida, LM 13-13 Location: Largo, Florida Proposed Action or Project Description: DOE proposes to use a Geoprobe to inject emulsified edible soybean oil (EEO) and anaerobic microbial solution into the surficial aquifer at the 4.5 Acre Site adjacent to the DOE Young - Rainey STAR Center (Pinellas Site) in Largo, Florida. The proposed action would enhance naturally occurring anaerobic biodegradation, thereby reducing vinyl chloride contamination along the southwest boundary of the 4.5 Acre Site. Dehalococcoides ethenogenes (DHE) is a type of microbe that occurs naturally in the aquifer. Bioaugmentation with a commercially available DHE culture used in conjunction with the EEO would maximize the efficiency of contaminant biodegradation. No genetically engineered or

366

Reduction of NOx Emissions in Alamo Area Council of Government Projects  

E-Print Network [OSTI]

: Electricity and Natural Gas Savings From Retrofits Reported by the Audi Murphy Memorial Veterans Hospital (VA). ....................................................................................................................... 6 Table 5: Definitions... projects reported were LoanSTAR lighting upgrade projects implemented in December of 2001. In Table 4 the electricity and gas savings from retrofits reported for the Audi Murphy Memorial Veterans Hospital (VA) are shown. These projects include lighting...

Haberl, J. S.; Zhu, Y.; Im, P.

2004-01-01T23:59:59.000Z

367

Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

368

DOE - Office of Legacy Management -- Reactor Site - Fort Belvoir - VA 0-02  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reactor Site - Fort Belvoir - VA Reactor Site - Fort Belvoir - VA 0-02 FUSRAP Considered Sites Site: REACTOR SITE - FORT BELVOIR (VA.0-02 ) Eliminated from further consideration under FUSRAP - Referred to DOD Designated Name: Not Designated Alternate Name: None Location: Fort Belvoir , Virginia VA.0-02-1 Evaluation Year: 1987 VA.0-02-1 Site Operations: No evidence of AEC involvement with reactor operations. AEC conducted health and safety inspections of this site. Probably a licensed operation. VA.0-02-1 Site Disposition: Eliminated - Referred to DOD VA.0-02-1 Radioactive Materials Handled: Reactor fuel Primary Radioactive Materials Handled: Reactor Fuel Radiological Survey(s): Health and safety inspections VA.0-02-1 Site Status: Eliminated from further consideration under FUSRAP - Referred to DOD VA.0-02-1

369

EN T OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETER1v1INATION  

Broader source: Energy.gov (indexed) [DOE]

I.0~ \ I.0~ \ u .s. DEPARTM EN T OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETER1v1INATION RECIPIENT:Fairiax County PROJECT TITLE: Activity 13, Energy Audits and Retrocommissionin Page 1 of2 STATE: VA Funding Opportunity Announcement Number PrO(urement Instrument Number NEPA Control Number CID Number DE-FOA-0000013 DE-EE0000873 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 45l.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A 11 Technical advice and planning assistance to international, national, slale, and local organizations. A9 Information gathering (including, but not limited to, literature surveys, inventories, audits). data analysis (including

370

U.S. DEPARTIVIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlVIINATION  

Broader source: Energy.gov (indexed) [DOE]

DEPARTIVIENT OF ENERGY DEPARTIVIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlVIINATION RECIPIENT:County of Fairfax STATE: VA PROJECT Electric and hybrid vehicle incremental cost recovery TITLE: Funding Opportunity Announcement Number Procurement Instrument Number NEP A Control Number cm Number DE-FOA-0000013 DE-EE0000873 Gf O- O tXt:lP';- O D3 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

371

u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAG EMENT CENTER NEPA DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

City of Virginia Beach City of Virginia Beach PROJECT TITLE: Virginia Beach Wind Turbine Demonstration Project Page I of2 STATE: VA Funding Opportunity Announcement Number DE-FOAOOOOO13 Procurement Instrument Numbn DE-EE0000876.002 NEPA. Control Numbn cm Number o Based on my review ofthe information concerning the proposed action, as NEPA Compliance Offien (authorized under DOE Order 451.IA), I have made the following determination; ex, EA, EIS APPENDIX AND NUMBE R: Description: A11 Technical advice and planning assistance to intemational, national, state, and local organizations. A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

372

RECIPIENT:Fairfax County u.s. DEPARTl\-IENT OF ENERGY EERE PROJECT MANAG  

Broader source: Energy.gov (indexed) [DOE]

Fairfax County Fairfax County u.s. DEPARTl\-IENT OF ENERGY EERE PROJECT MANAG EMENT CENTER NEPA DETERMINATION Page 1 of2 STATE: VA PROJECT TITLE: Activity 18, Energy Conservation Education and Residential Energy Efficiency Audits and Rebates Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000013 DE-EE0000873.001 0 Based on my review of the information concerning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.IA), I have made the following determination : ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

373

u.s. DEPARIIIIENI OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlIIINATION  

Broader source: Energy.gov (indexed) [DOE]

DEPARIIIIENI OF ENERGY DEPARIIIIENI OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlIIINATION RECIPIENT:New River Valley Regional Jail Authority PROJECf TITLE: New River Solar Thermal Hot Water Project Page 1 01'2 STATE: VA Funding Opportunity Announctment Number DE·FQA-OOOQ013 Procurement Instrument Number DE-EEOOOO864 NEPA Control Number CIO Number GF0-{)()()()864-008 a Based on my review ortbe information concerning the proposed action, as NEPA Compliance Officer (aulhoriud under DOr. Order 4Sl.IA), I have made tht following determi nation: ex, EA, EIS APPENDIX AND NUMBER: Description: 8 5. 1 Aclions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

374

u.s. DEPARThIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DFTFlUDNATION  

Broader source: Energy.gov (indexed) [DOE]

lA'''1, lA'''1, u.s. DEPARThIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DFTFlUDNATION Page 1 of3 RECIPIENT:HCl CleanTech STATE: VA PROJECf TITLE: Biomass Pre-extraction, Hydrolysis and Conversion Process Improvements for an Integrated Biorefinery Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-OOOO337 DE-EEOOO5003 GF()"o()()5003-OO1 0 Based on my review of the information concerning the proposf'd action, as NEPA Compliance Officer (authorized under DOE Order 4SI.IA), I have made the rollowing determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 83.6 Siting, construction (or modification). operation, and decommissioning of facilities for indoor benen-scale research projects and conventional laboratory operations (for example, preparation of chemical standards and sample analysis);

375

u.s. DEPARTMENT OF ENER Y EERE PROJECT MANAGEMENT CENTER NEPADETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

'I.(J~) 'I.(J~) u.s. DEPARTMENT OF ENER Y EERE PROJECT MANAGEMENT CENTER NEPADETERMINATION RECIPIENT:Virginia Department of Mines, Minerals and Energy PROJECT TITLE : PY 2012 State Energy Program Formul a Grant Page 1 of2 STATE: VA Funding Opportunity Announ<:ement Number Procurement Instrument Number NEPA Control Number elD Number DE-FOA-Q000643 EE()(X)IJ246 1 GFO-OOOO246-OO2 Based on my review of the information concerning the proposed action, as NEP Compliance Officer (authorized under DOE Order 451.1 A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: I1cscription: A11 Technical adv ice and assistance to organizations A9 Information Technical advice and planning assistance to internati ai, national, state, and local organizations

376

ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT (EECBG) - BETTER BUILDINGS NEIGHBORHOOD PROGRAM AT GREATER CINCINNATI ENERGY ALLIANCE Project Title: Home Performance with Energy Star and Better Buildings Performance  

SciTech Connect (OSTI)

The Greater Cincinnati Energy Alliance (Energy Alliance) is a nonprofit economic development agency dedicated to helping Greater Cincinnati and Northern Kentucky communities reduce energy consumption. The Energy Alliance has launched programs to educate homeowners, commercial property owners, and nonprofit organizations about energy efficiency opportunities they can use to drive energy use reductions and financial savings, while extending significant focus to creating/retaining jobs through these programs. The mission of the Energy Alliance is based on the premise that investment in energy efficiency can lead to transformative economic development in a region. With support from seven municipalities, the Energy Alliance began operation in early 2010 and has been among the fastest growing nonprofit organizations in the Greater Cincinnati/Northern Kentucky area. The Energy Alliance offers two programs endorsed by the Department of Energy: the Home Performance with ENERGY STAR Program for homeowners and the Better Buildings Performance Program for commercial entities. Both programs couple expert guidance, project management, and education in energy efficiency best practices with incentives and innovative energy efficiency financing to help building owners effectively invest in the energy efficiency, comfort, health, longevity, and environmental impact of their residential or commercial buildings. The Energy Alliance has raised over $23 million of public and private capital to build a robust market for energy efficiency investment. Of the $23 million, $17 million was a direct grant from the Department of Energy Better Buildings Neighborhood Program (BBNP). The organizations investments in energy efficiency projects in the residential and commercial sector have led to well over $50 million in direct economic activity and created over 375,000 hours of labor created or retained. In addition, over 250 workers have been trained through the Building Performance Training Center, a program that was developed and funded by the Energy Alliance and housed at Cincinnati State Technical and Community College. Nearly 100 residential and commercial contractors currently participate in the Energy Alliances two major programs, which have together served over 2,800 residential and 100 commercial customers. Additionally, the Energy Alliance established loan programs for homeowners, nonprofits and commercial businesses. The GC-HELP program was established to provide up to ten year low interest, unsecured loans to homeowners to cover the energy efficiency products they purchased through the Energy Alliance approved contractor base. To date the Energy Alliance has financed over $1 million in energy efficiency loans for homeowners, without any loans written off. The nonprofit business community is offered five year, fixed-interest rate loans through the Building Communities Loan Fund of $250,000. Additionally, the Energy Alliance has developed GC-PACE, a commercial financing tool that enables buildings owners to finance their energy upgrades through voluntary property assessments deploying low-interest extended-term capital from the bond market. The Energy Alliance and its partners are actively evaluating additional market-based financing solutions.

Holzhauser, Andy; Jones, Chris; Faust, Jeremy; Meyer, Chris; Van Divender, Lisa

2013-12-30T23:59:59.000Z

377

U.S. Department of Energy Hydrogen and Fuel Cells Program 2012 Annual Merit Review and Peer Evaluation Report: May 14-18, 2012, Arlington, VA  

SciTech Connect (OSTI)

This document summarizes the comments provided by peer reviewers on hydrogen and fuel cell projects presented at the fiscal year (FY) 2012 U.S. Department of Energy (DOE) Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting (AMR), held May 14-18, 2012, in Arlington, VA.

Not Available

2012-09-01T23:59:59.000Z

378

Contract Connections @ ChallengeHER, Norfolk VA, October 14  

Broader source: Energy.gov [DOE]

The U.S. Small Business Administration (SBA), Women Impacting Public Policy (WIPP), and American Express OPEN have partnered to host this special FREE contracting event for women business owners. American Express OPEN will hold a Contract Connections session at the ChallengeHER Norfolk Event, on October 14th, 2014 at the Webb University Center, Norfolk, VA.

379

Polarized Muon Decay at Rest with V+A Interaction  

E-Print Network [OSTI]

In this paper, we analyze the polarized muon decay at rest (PMDaR) and elastic neutrino-electron scattering (ENES) admitting the non-standard V+A interaction in addition to standard V-A interaction. Considerations are made for Dirac massive muon neutrino and electron antineutrino. Moreover, muon neutrinos are transversely polarized. It means that the outgoing muon-neutrino beam is a mixture of the left- and right-chirality muon neutrinos and has a fixed direction of transverse spin polarization with respect to production plane. We show that the angle-energy distribution of muon neutrinos contains the interference terms between the standard V-A and exotic V+A couplings, which are proportional to the transverse components of muon neutrino spin polarization. They do not vanish in a limit of massless neutrino and include the relative phases to test the CP violation. In consequence, it allows to calculate a neutrino flux and an expected event number in the ENES (detection process) both for the standard model prediction and the case of neutrino left-right mixture.

W. Sobkw; S. Ciechanowicz; M. Misiaszek

2011-02-07T23:59:59.000Z

380

Health and Wellness @ U.Va. Department of Student Health  

E-Print Network [OSTI]

Health and Wellness @ U.Va. Department of Student Health Counseling and Psychological Services "Without health there is no happiness. An attention to health, then, should take the place of every other on Accreditation of Healthcare Organizations 2013 Parents Handbook p. 36-41 #12;Student Health Services · 12:30am-2

Acton, Scott

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Flyer, Title VI  

Broader source: Energy.gov [DOE]

Titles VI and IX of the Civil Rights Act of 1964, as amended prohibit discrimination in programs and activities receiving Federal financial assistance.

382

No Slide Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MACRO MACRO MARINE BOUNDARY LAYER CLOUD MACRO - - SCALE STRUCTURE SCALE STRUCTURE DURING THE AMF POINT REYES DEPLOYMENT DURING THE AMF POINT REYES DEPLOYMENT Michael Jensen 1 , Andrew M. Vogelmann 1 , Edward P. Luke 1 , Patrick Minnis 2 , Mark A. Miller 3 , Mandana Khaiyer 4 , Louis Nguyen 2 and Rabindra Palikonda 2,4 1 Brookhaven National Laboratory, Upton, New York, 2 NASA Langley Research Center, Hampton, VA 3 Rutgers University, New Brunswick, NJ, 4 Science Systems and Applications, Inc., Hampton, VA Corresponding author: Mike Jensen, mjensen@bnl.gov, (631) 344-7021 1. 1. OBJECTIVES OBJECTIVES * Use satellite observations to place the AMF surface-based and aircraft observations into a larger-scale context relevant to GCM-sized grids (e.g. 300 x 300 km) * Quantify the macro- and microphysical properties of

383

E-Print Network 3.0 - analyze va shenasai Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

is how an organism Summary: 12;87Analyzing the effect of wind on flight migration dataset (APM) between Va and Vg-Va using... . Furthermore, we focus on the analysis of air...

384

E-Print Network 3.0 - adenovirus va rna-derived Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

va rna-derived Search Powered by Explorit Topic List Advanced Search Sample search results for: adenovirus va rna-derived Page: << < 1 2 3 4 5 > >> 1 MINI REVIEW MODIFIED...

385

CSCE4610: Project Grading Sheet (Krishna Kavi)  

E-Print Network [OSTI]

CSCE4610: Project Grading Sheet (Krishna Kavi) Assumption: A report on one or more commercially available architecture Student Name: _____________________________________________ Project Title. are used to determine the difficulty of the project 2. Project Details 60% Completeness Identification

Kavi, Krishna

386

V.A. HOSPITAL QUALITY MONITORS: 19881997 Mike West, Omar Aguilar & Viridiana Lourdes  

E-Print Network [OSTI]

V.A. HOSPITAL QUALITY MONITORS: 1988­1997 Mike West, Omar Aguilar & Viridiana Lourdes Institute, 1998 This report discusses reanalysis of VA hospital quality monitor data sets as described in West and Aguilar (1997) ``Studies of Quality Monitor Time Series: The V.A. Hospital System. In Fall 1998 the data

West, Mike

387

V.A. HOSPITAL QUALITY MONITORS: 1988-1997 Mike West, Omar Aguilar & Viridiana Lourdes  

E-Print Network [OSTI]

V.A. HOSPITAL QUALITY MONITORS: 1988-1997 Mike West, Omar Aguilar & Viridiana Lourdes Institute, 1998 This report discusses reanalysis of VA hospital quality monitor data sets as described in West and Aguilar 1997 Studies of Quality Monitor Time Series: The V.A. Hospital System. In Fall 1998 the data set

West, Mike

388

Module Title: Project Module Code: OPTO6005  

E-Print Network [OSTI]

Ibsen, Dr Ping Hua, Prof James Wilkinson Contact (email ID) sm@orc.soton.ac.uk, mi@orc.soton.ac.uk, ph2@orc.soton.ac.uk, jsw@orc.soton.ac.uk Is the module subject to external accreditation? No If yes and optical labs of the ORC 3. Train in technical and hands-on research skills to gain technical insight

Anderson, Jim

389

R[CIPIENT:Fairfax County u.s. DEPARThIFNT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

Fairfax County Fairfax County u.s. DEPARThIFNT OF ENERGY EERE PROJECT MANAGEMENT CENTER NFPA DFTFIU.IINATION PROJECT TITLE: Installation of EV Charging Stations at County Facilities Page 1 of2 STATE: VA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number OE-FOA.()()()()(}13 OE-EEOOOO873 GF0-0000873-004 0 Based on my Rview oflbe informalion concerning the proposed action, as NEPA Compliance Officer (authorized UDder DOE Order 451.1A),1 have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 8 5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

390

u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAG EMEN T CENTER NEPA DETERl\ilNATION  

Broader source: Energy.gov (indexed) [DOE]

City of Noriolk City of Noriolk u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAG EMEN T CENTER NEPA DETERl\ilNATION Page 1 of2 STATE: VA PROJECT TITLE: Green Vision Community Energy Program and Evergreen Municipal Energy Efficiency Program- SOW (5) Funding Opportunity Announcement Number Proc:urt:mtnt Instrument Number NEPA Control Number CID Number DE-FOA-OOOOO13 OE-EEOOOO880/000 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

391

Two Line Subject Title One Line Title  

Broader source: Energy.gov (indexed) [DOE]

Title IX, Subtitle J (EPAct Title IX, Subtitle J (EPAct 2005) Complementary Program - Office of Research and Development September 2008 2 3 Complementary Program NETL - ORD * Areas of research - Drilling Under Extreme Conditions - Environmental Impacts of Oil and Gas - Enhanced and Unconventional Oil Recovery - Resource Assessment * Institute for Advanced Energy Solutions - West Virginia University, Carnegie-Mellon University, and University of Pittsburgh * Penn State University and Oregon State University 4 Drilling Under Extreme Conditions * Ultra-deep single cutter drilling simulator - Recreates bottom-hole drilling environment of ultra-deep wells (30,000 psi and 481 o F) - Delivered to NETL later this year - Operates with real drilling fluids - X-ray video system images cuttings - Verify the results of the full bit

392

Global Environmental Course Title  

E-Print Network [OSTI]

Department Global Environmental Studies Room Course Title Frontier of Sustainability Science Instructor Akihisa MORI, Global Environmental Studies Satoshi KONISHI, Institute of Advanced consisting from a variety of academic field, including philosophy, politics, economics, energy, architecture

Takada, Shoji

393

LM's New Role for the DOE Title X Reimbursement Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program October 16, 2012 - 10:01am Addthis LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program What does this project do? Goal 4. Optimize the use of land and assets Title X of the Energy Policy Act of 1992 authorized U.S. Department of Energy (DOE) to reimburse licensees of 1 thorium and 13 uranium processing sites (Figure 1) for a portion of their remedial action costs attributable

394

LM's New Role for the DOE Title X Reimbursement Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program October 16, 2012 - 10:01am Addthis LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program What does this project do? Goal 4. Optimize the use of land and assets Title X of the Energy Policy Act of 1992 authorized U.S. Department of Energy (DOE) to reimburse licensees of 1 thorium and 13 uranium processing sites (Figure 1) for a portion of their remedial action costs attributable

395

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research and Development Research and Development Project Review Meeting Presenter: John Litynski, PE United States Department of Energy, National Energy Technology Laboratory, U.S. DOE Office of Fossil Energy National Energy Technology Laboratory August 21-23, 2012 Pittsburgh, PA 2 WELCOME 3 * Annual requirement in all cooperative agreements and grants * First complete program review of 126 carbon storage projects - 7 Regional Partnerships (Large scale injection projects) - 14 Infrastructure (Injection, Characterization, systems modeling) - 38 Geologic Storage - 28 Simulation and Risk Assessment - 26 Monitoring, Verification, and Accounting (MVA) - 6 CO2 Use and Reuse - 7 Training Centers * Report on technical progress and financial status of projects * 55 Posters

396

P AU! U.S. DFPARl'MENT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

AU! AU! ) U.S. DFPARl'MENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NFPA DI!TFmllNATION RECIPIENT:Virginia Electric and Power Company Page 1 of2 STATE: VA PROJECf TITLE: Integrated Optimization and Cost Analysis of an Innovative Offshore Wind Plant Design for Shallow and Transitional Water Depths Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number eln Number DE-FOA-0000415 DE-EEOOO5485 GFO-OOO5485-001 0 Based on my nview D(the information concerning the propo5ed action, as NEPA Compliance Officer (authorized under DOE Order 451.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering, analysis, and disseminat ion Information gathering (including, but not limited to, literature surveys, inventories, site visits, and audits), data analysis

397

U.S. DEPARTl\IENT OF ENERGY EERE PROJECT MANAG EMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

DETERMINATION DETERMINATION RECIPI ENT:Prince William County, Virginia PROJECT TITLE: Energy Efficient Building Upgrades Page 1 of2 STATE: VA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-OOOOO13 DE-EE0000867.001 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.lA). I have made the fo llowing determ ination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consuHants, designers), organizations (such as utilities), and state

398

Big Data Projects on Solar Tech Evolution and Diffusion  

Broader source: Energy.gov [DOE]

This is the meeting agenda from the Big Data Projects on Solar Technology Evolution and Diffusion kickoff meeting, held on July 15, 2013 in Arlington, VA and facilitated by the SunShot Initiative.

399

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CO CO 2 Storage Resource Methodologies Presenter: Angela Goodman Team: Angela Goodman, Grant Bromhal, Brian Strazisar, Traci Rodosta and George Guthrie United States Department of Energy, National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CCUS August 21-23, 2012 Pittsburgh, PA 2 U.S. DEPARTMENT OF ENERGY  OFFICE OF FOSSIL ENERGY NATIONAL ENERGY TECHNOLOGY LABORATORY CARBON STORAGE PROGRAM with ARRA Projects Benefits Global Collaborations Technology Solutions Lessons Learned North America Energy Working Group Carbon Sequestration Leadership Forum International Demonstration Projects Canada (Weyburn, Zama,

400

Project Website Information Architecture  

E-Print Network [OSTI]

Project Website Information Architecture Overview Purpose: To describe up front what your initiative/project does. This section does not need to literally be called "Overview;" you can come up with anther suitable title that is more specific to your project. Examples of what to include: Information

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

TITLE48CHAPTER9  

Broader source: Energy.gov (indexed) [DOE]

TITLE 48 CHAPTER 9 CODE OF FEDERAL REGULATIONS TITLE 48 CHAPTER 9 CODE OF FEDERAL REGULATIONS DEPARTMENT OF ENERGY ACQUISITION REGULATION TABLE OF CONTENTS Subchapter A - General 901 - Federal Acquisition Regulations System 902 - Definitions of words and terms 903 - Improper business practices and personal conflicts of interest 904 - Administrative matters Subchapter B - Acquisition Planning 905 - Publicizing contract actions 906 - Competition requirements 908 - Required sources of supplies and services 909 - Contractor qualifications 911 - Describing Agency needs 912 - Acquisition of Commercial Items Subchapter C - Contracting Methods and Contract Types 913 - Simplified acquisition procedures 914 - Sealed bidding 915 - Contracting by negotiation 916 - Types of contracts

402

U.S. DI!PARTMFNT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DE1'l1R1.llNATION  

Broader source: Energy.gov (indexed) [DOE]

PARTMFNT OF ENERGY PARTMFNT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DE1'l1R1.llNATION RECIPIENT:Loudoun County Virginia Government Page 1 of2 STATE:: VA PROJECT TITLE: Scott Jenkins Parking Lot LED Lighting with Solar Arrays and on·site EV Charging Stations Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number EEOOOO868 DE-EEOOOO86B GFO-OOOO868-OO3 EEO Based on my review orthe information concerning tbe proposed action, as NEPA CompliaMt Officer (authorized under DOE Order 451.1A), I have made the following determination; ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy. demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

403

Safety of Carotid Endarterectomy in a High-Risk Population: Lessons from the VA and Connecticut  

Science Journals Connector (OSTI)

Background The safety and efficacy of carotid endarterectomy (CEA) have been demonstrated in randomized trials, but these studies excluded patients thought to be at higher risk for poor outcomes. We sought to determine whether patients undergoing CEA in Veteran Affairs Hospitals (VA) were at higher risk and had different outcomes, compared with patients in nonfederal hospitals. Study Design Records of all CEA performed in the VA Connecticut Healthcare System between October 1997 and September 2002 were examined and compared with CEA performed in all nonfederal Connecticut hospitals (CT). Results There were 7,089 \\{CEAs\\} performed (VA, 140; CT, 6,949). VA patients had increased comorbidity scores and symptomatic presentation (39% versus 14%; p Connecticut. These results suggest not only that patients undergoing vascular surgery at the VA may form a higher-risk population compared with patients receiving care in non-VA hospitals, but that these high-risk patients can undergo CEA safely.

Jeffrey S. Weiss; Patricia Dumas; Charles Cha; Richard J. Gusberg; Alan Dardik

2006-01-01T23:59:59.000Z

404

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wellbores and Drilling Wellbores and Drilling Brian Strazisar NETL Title, Date ‹#› Technology or Capability Overview * 3 primary efforts related to wellbore cement - Risk of wellbore leakage in CO 2 storage/EOR - Stability of foamed cements in deep offshore wells - Shallow gas migration in shale gas wells * Extreme Drilling Laboratory (XDL) - NETL Facility to study drilling processes under conditions that exist at extreme depths ‹#› CO 2 and Wellbore Leakage Risk * Early NETL work defined mechanism for chemical reaction between CO 2 and wellbore cement. * Degradation of cement determined to be too slow to impact well integrity in the absence of preexisting flow paths CaCO 3(s) barrier (2) Degraded Zone (3) Propagation of Fronts Ca(OH) 2 depleted zone (1)

405

CSCE3030: Project Grading Sheet (Krishna Kavi)  

E-Print Network [OSTI]

CSCE3030: Project Grading Sheet (Krishna Kavi) Student Name: _____________________________________________ Project Title: _______________________________________________ 1.Problem Difficulty 15% Originality, material from outside of the class new concepts, etc. are used to determine the difficulty of the project 2

Kavi, Krishna

406

u.s. DEPARUIENT OE ENERGY EERE PROJECT MANAGEMENT CENTER NEV...  

Broader source: Energy.gov (indexed) [DOE]

ENERGY EERE PROJECT MANAGEMENT CENTER NEV. DETERlIINATION RECIPI": NT:Ocean Renewable Power Company PROJECT TITLE: TidGen Power System Commercialization Project Pagelof3 STATE:...

407

Project Number: IST-2001-33100 Project Acronym: PROFUNDIS  

E-Print Network [OSTI]

and achievements . . . . . . . . . . . . . . 15 3 Project management and coordination 15 4 Cost breakdown 15 5Project Number: IST-2001-33100 Project Acronym: PROFUNDIS Title : Proofs of Functionality;cation: Public Contract start date 1 January 2002 Duration: 3 years Project co-ordinator: Joachim Parrow

Parrow, Joachim

408

Project Number: IST-2001-33100 Project Acronym: PROFUNDIS  

E-Print Network [OSTI]

and achievements . . . . . . . . . . . . . . 17 3 Project management and coordination 17 4 Cost breakdown 17 5Project Number: IST-2001-33100 Project Acronym: PROFUNDIS Title : Proofs of Functionality Classification: Public Contract start date 1 January 2002 Duration: 3 years Project co-ordinator: Joachim Parrow

Parrow, Joachim

409

Geysers Project Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Geothermal Project Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Geysers Project Geothermal Project Project Location Information Coordinates 38.790555555556°, -122.75583333333° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.790555555556,"lon":-122.75583333333,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

410

Report Title: Mapping  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Title: Title: Mapping of Reservoir Properties and Facies Through Integration of Static and Dynamic Data Report Type: Final Technical Report Reporting Period Start Date: October 1, 2000 Reporting Period End Date: September 30, 2004 Principal Authors: Albert C. Reynolds, Dean S. Oliver, Yannong Dong, Ning Liu, Guohua Gao, Fengjun Zhang & Ruijian Li Date Report Issued: December 2004 DOE Award Number: DE-FC26-00BC15309 Petroleum Engineering Department The University of Tulsa 600 South College Avenue Tulsa, Oklahoma 74104 This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product,

411

No Slide Title  

Broader source: Energy.gov (indexed) [DOE]

Traditional Research and NETL Traditional Research and NETL Complementary Research Portfolio September 25, 2012 Alexandra Hakala Technical Coordinator, Shale Gas Office of Research and Development National Energy Technology Laboratory 2 Maximizing Benefits 9 Projects Resource Characterization 12 Projects Production Optimization Department of Energy Office of Fossil Energy Industry Consortium RPSEA Complementary Research Appropriated Funded Program (Extramural) @ NETL Minimizing Impacts 10 Projects Water Treatment 4 Projects Water Resources Mgmt 2 Projects Impact Mitigation and Decision-making 3 Current Appropriated Program Drivers: Secretary of Energy Advisory Board - Recommendations for Federal Agencies * Enhance the quality and quantity of public

412

Category:Projects | Open Energy Information  

Open Energy Info (EERE)

2 subcategories, out of 2 total. P Private Sectors Public Sectors Retrieved from "http:en.openei.orgwindex.php?titleCategory:Projects&oldid272216...

413

Title of Presentation | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Title of Presentation Title of Presentation More Documents & Publications Cybersecurity for Energy Delivery Systems 2010 Peer Review Presentations - Software Engineering...

414

Title Line 2 Commercialization at the  

E-Print Network [OSTI]

-exclusive or exclusive license (royalty free or royalty bearing) ­ Researchers sign acknowledgment #12;Title Title Line 2

Czarnecki, Krzysztof

415

Title Slide Examples  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

measures * Multi-fuel, performance based * Total energy use performance period * Target EUI vs. actual * Piloting in deep retrofit program * 6 projects in pilot Construction...

416

Project Year Spring 2009  

E-Print Network [OSTI]

Project Year Spring 2009 Project Title A Database of Film and Media History and Aesthetics Part 2 experience with colleagues, they were eager to participate in expanding the database to include clips or they simply don't have the time, or both. Solution: The development of a user-friendly database of clips would

Gray, Jeffrey J.

417

Project Documentation Group Members  

E-Print Network [OSTI]

agencies to track client services and outcomes, thus providing sound documentation that justifies stateCSC 4330 Project Documentation 11/30/2009 Group Members: Andy Bursavich Justin Farr Will Folse Chris Miceli Michael Miceli #12;Group Answers I. The Title ­ UREC Client Tracking System II. The project

Kundu, Sukhamay

418

Presentation title goes here  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Future of DR Future of DR March 3, 2011 Sila Kiliccote, Mary Ann Piette, Dave Watson, Rish Ghatikar Deputy, DRRC Program Manager, LBNL SKiliccote@lbl.gov 2 Presentation Overview * Trends * Policy * Technology * Implementations * Load As Resource in Ancillary Services Markets * Future directions towards responsive buildings 3 Trends Policy Dynamic Rates - Large C&I, residential, small commercial Codes and Standards -Title 24, US Green Building Council's LEED Credits Smart Grid Standards effort Ancillary Services Technology Integration of Renewables Energy Storage Technologies - Can DR replace storage? PHEVs and EVs Implementation Linking Energy Efficiency and DR Utility Implementations Smart Grid Investment and Demonstration Grants 4 Demand Side Management and Automated DR Future

419

Superconductivity for Electric Systems Annual Peer Review Arlington, VA July 25-27, 2006Superconductivity for Electric Systems Annual Peer Review Arlington, VA July 25-27, 2006 Understanding and Pushing the Limits  

E-Print Network [OSTI]

Superconductivity for Electric Systems Annual Peer Review Arlington, VA July 25-27, 2006Superconductivity for Electric Systems Annual Peer Review Arlington, VA July 25-27, 2006 Understanding and Pushing pinning " #12;Superconductivity for Electric Systems Annual Peer Review Arlington, VA July 25-27, 2006

420

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sequestration Program Sequestration Program Sean I. Plasynski, PhD Sequestration Technology Manager November 12, 2009 Mostly CO 2 CO 2 Mostly H 2 Mixed Gas Stream and other gases 2 Key Challenges to Carbon Capture and Storage *Capture Technology - Existing Plants - New Plants (PC) - IGCC *Cost of CCS *Sufficient Storage Capacity *Permanence *Best Practices - Storage Site Characterization - Monitoring/Verification - Site Closure - Etc etc ... *Regulatory Framework - Permitting - Treatment of CO 2 *Infrastructure *Human Capital *Legal Framework - Liability - Ownership * pore space * CO 2 *Public Acceptance (NIMBY  NUMBY) Technical Issues Legal/Social Issues Projects helping to address both categories of issues 3 PC Boiler (With SCR) Sulfur Removal Particulate Removal Ash Coal 7,760 TPD STEAM CYCLE CO 2 Capture Process* ID Fan Air

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Atlas II Atlas II Dawn M. Deel Project Manager - Carbon Sequestration 2 Atlas I - Background and Statistics * 2007 - DOE released the first version of the Carbon Sequestration Atlas of the U.S. and Canada * Result of cooperation and coordination among carbon sequestration experts from local, state, and government agencies, as well as industry and academia * Atlas presented the first coordinated assessment of carbon capture and storage (CCS) potential across the majority of the U.S. and portions of western Canada * Over 3,000 hardcopies released * 1,000 CDs mailed * Daily downloads from NETL website * Widespread media and industry attention * Continued public interest 3 Atlas II * Scheduled for release in November 2008 (GHGT9) * Purpose of this update: To update the CO 2 storage portfolio, document differences in CO

422

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

R&D Introduction R&D Introduction Briggs M. White Project Manager National Energy Technology Laboratory United States Department of Energy July 28, 2010 11 th Annual SECA Workshop, Pittsburgh PA 2 SOFC Anode SOFC Cathode air Atmospheric SOFC Oxy-Comb Heat Recovery oxygen CO 2 Condenser CO 2 Compressor & dryer stack gas expander Water Recycle SECA Coal-Based Atmospheric IGFC blower * Atmospheric SOFC with catalytic gasification 25 % Methane * Separate Fuel and Air Streams: Oxy Combustion * Cycle Efficiency (HHV); 99% Capture  ~51% with CO2 Compression  ~54% w/out CO2 Compression air ASU Gas Cleaning (Dry or WGCU) air N 2 coal oxy-comb O 2 Catalytic Gasification CH 4 O 2 CO, H 2 , CH 4 expander 3 SOFC Operating Conditions for Coal Plants Fuel IN Air OUT Fuel OUT Air IN Temperature Model High system efficiency is a key target

423

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Partnership Annual Meeting Partnership Annual Meeting Terrestrial Best Practices Manual Sean I. Plasynski, PhD Sequestration Technology Manager November 16, 2009 Mostly CO 2 CO 2 Mostly H 2 Mixed Gas Stream and other gases 2 BSCSP WESTCARB SWP PCOR MGSC MRCSP SECARB Terrestrial Project Categorization Agricultural soils Soil Reclamation Afforestation Accounting/Aggregation Wetlands Reclamation J A B C D E F G I H K Terrestrial Field Tests - Tree-plantings - No-till farming - Wetlands restoration - Land management: grasslands, grazing lands - Fire management - Forest preservation - Monitoring, mitigation, and verification technologies 3 CCS Best Practice Manuals Critical Requirement For Significant Wide Scale Deployment Capturing Lessons Learned Best Practice Manual Version 1 (Phase II) Version 2 (Phase III) Final Guidelines

424

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carbon Sequestration Atlas of the Carbon Sequestration Atlas of the United States and Canada Dawn Deel, Project Manager, Sequestration Division October 5, 2010 2 Background and Statistics Atlas I - March 2007 * First coordinated assessment of CCS in the US and Canada * Provided maps showing number, location and magnitude of CO 2 sources * Maps showing areal extent of geologic storage sites * Storage potential by Partnership * Digital Atlas developed * Over 3,000 hardcopies released: 1,000 CDs mailed * Daily downloads from NETL website Atlas II - November 2008 * Updated the CO 2 storage portfolio * Documented differences in CO 2 resource and CO 2 capacity * Provided CO 2 emission estimation for stationary sources * Described Interagency collaboration * Illustrated federal lands CO 2 geologic storage potential

425

No Slide Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the Nation the Nation US Army Corps US Army Corps of Engineers of Engineers Tenkiller Tenkiller Auxiliary Auxiliary Spillway Project Spillway Project Project Scope: Phase 1 provide a new auxiliary spillway with 5 tainter gates, and maint. bridge Phase 2 construct a new highway bridge, remove the plug and re-water. Phase 1 Started: July 1999 Phase 1 Completed: December 2003 Phase 2 Started: March 2004 Scheduled Completion Date: August 2006 One Corps Serving The Army and the Nation US Army Corps US Army Corps of Engineers of Engineers Total Project Cost: $39.9M Phase 1 Construction Costs: 22.3M Phase 2 Construction Costs: $6.5M Remaining Activities: Complete permanent electrical connections to the substation. Complete stop logs. Tenkiller Tenkiller Auxiliary Auxiliary Spillway Project

426

Staff Recommendations for Remaining Projects in the RME/AP Category Review 5/18/2011 # Task1 SubCat ProjNum Title Sponsor ISRPRec BiOp Accord FY12Req BPA  

E-Print Network [OSTI]

199506425 Policy, Plan and Technical Support of Washington Department of Fish and Wildlife (WDFW)-Yakima/Klickitat Fisheries Project (YKFP) Washington Department of Fish and Wildlife (WDFW) Yes (Qualified) $197,917 Art 2012; project to wind down for close out within FY 2012. 102 B AP 200203100 Growth Modulation in Salmon

427

No Slide Title  

Broader source: Energy.gov (indexed) [DOE]

1 1 Presented by: Mark Steele: Ex WAGR Project Manager Decommissioning of Windscale Advanced Gas-Cooled Reactor (WAGR) Slide 2 Introduction * UK policy for nuclear power plant decommissioning is long-term safe- storage of reactor facilities * WAGR Project is being used to demonstrate that such a plant can be fully decommissioned * Project funded by the UK Government * Windscale Licensee UKAEA * During early and mid 1990"s facility modified and construction of Reactor Dismantling Machine and Waste Route * 1999 contract let for the dismantling of the reactor to Magnox Electric - fixed price * Scope included engineering and design, safety submission, provision of equipment and operations

428

Policy Procedure Administrative Directive Title: _____________________________________  

E-Print Network [OSTI]

Policy ­ Procedure ­ Administrative Directive Title: _____________________________________ Policy-President _____________ See also: Related Policies, Procedures and Agreements: Relevant Legislation and Regulations: ____________________________________________________________________________ Background and Purpose: ____________________________________________________________________________ Policy

Northern British Columbia, University of

429

Title 44 Excerpts  

Broader source: Energy.gov (indexed) [DOE]

4 Excerpts 4 Excerpts The United States Code - Title 44 PUBLIC PRINTING AND DOCUMENTS And Miscellaneous Statutes Identify the Authority of the Joint Committee on Printing 1997 EDITION CHAPTER 5 - PRODUCTION AND PROCUREMENT OF PRINTING AND BINDING Section 501. Government printing, and blank-book work for Congress, the Executive Office, the Judiciary, other than the Supreme Court of the United States, and every executive department, independent office and establishment of the Government, shall be done at the Government Printing Office, except- (1) classes of work the Joint Committee on Printing considers to be urgent or necessary to have done elsewhere; and (2) printing in field printing plants operated by an executive department, independent office of establishment, and the procurement of printing by an executive department,

430

DOE Selects 3 Small-Scale Biorefinery Projects for up to $86...  

Energy Savers [EERE]

VA. "These projects will help pioneer the next generation of non-food based biofuels that will power our cars and trucks and help meet President Bush's goal to stop...

431

Active Project Justification Statements  

Broader source: Energy.gov (indexed) [DOE]

Project Justification Statements Project Justification Statements Date Received PJS Number Title Owner / Author Status ORG Due Date 10/26/2012 PJS-2012-007 Cost Benefit Analysis for Nuclear Facility Accident Prevention or Mitigation Design Options, Project Justification 1/9/2013 PJS-2013-01 DOE HDBK of Optimizing Radiation Protection of the Public and the Environment 6/24/2013 PJS-2013-03 Review and Approval of Nuclear Facility

432

W.Va. Mom Sees Benefits of Weatherization | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

W.Va. Mom Sees Benefits of Weatherization W.Va. Mom Sees Benefits of Weatherization W.Va. Mom Sees Benefits of Weatherization April 2, 2010 - 2:43pm Addthis Joshua DeLung Not only is Rachael McCarty working full-time and going to college, but also she's a full-time single mom of two small children. After moving to Bluefield, W.Va., from California a few years ago, Rachel bought her first home, a property that needed some work. "It's a very, very old house, and it didn't really have any insulation," she says. Last year, Rachael was approved for the weatherization assistance program from Community Action of South Eastern West Virginia. The agency installed a new furnace and insulation, along with a new hot water heater and weather stripping for the doors. She says the house was much easier to heat this

433

VaPa - nuorten varhennettu kuntoutus Lappeenrannassa; Backdated rehabilitation of youngsters in Lappeenranta.  

E-Print Network [OSTI]

??Kehittmishanke ksittelee Lappeenrannassa vuosina 2001-2003 toteutettua nuorten varhennettua kuntoutusta VaPa- hanketta. Kuntoutuskokeilun jrjestettiin Lappeenrannan sosiaali- ja terveysviraston ostopalveluna yhteis-voimin Lappeenrannan Kelan, tyvoimatoimiston ja toteuttajatahon Laptuote-stin (more)

Korja,Minna-Liisa

2006-01-01T23:59:59.000Z

434

DOE Zero Energy Ready Home Case Study: Promethean Homes, Charlottesville, VA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Charlottesville, VA, that achieves a HERS 33 without PV. The 2,572-ft2 custom home with daylight basement, has 2x6 advanced framed walls filled with R...

435

Work Authorization Document NSTX Upgrade Project  

E-Print Network [OSTI]

Work Authorization Document NSTX Upgrade Project Control Account #: 1302 Title: WBS 1.1.11 Title Functional Manager P. Heitzenroeder Approvals Signature Date NSTX-U Project Manager R. Strykowsky 4- WBS and includes design modifications and upgrade of the coil assembly stand; procedures for assembling the Center

Princeton Plasma Physics Laboratory

436

Work Authorization Document NSTX Upgrade Project  

E-Print Network [OSTI]

Work Authorization Document NSTX Upgrade Project Control Account #: 7900 Title: WBS 1.7.3 Title Functional Manager L. Dudek Approvals Signature Date NSTX-U Project Manager R. Strykowsky 4- WBS Dictionary procedures and documents to support the integrated tests, and to support performance of the pre

Princeton Plasma Physics Laboratory

437

Communication and Collaboration Keep San Francisco VA Medical Center Project on Track  

Broader source: Energy.gov [DOE]

The Veterans Affairs Medical Center in San Francisco is saving almost 3 million kilowatt-hours of electricity, more than 70,000 therms of natural gas, and more than $500,000 annually. The energy savings are enough to power 400 homes and supply natural gas to more than 100 homes each year in California. These savings were realized by taking advantage of Super Energy Savings Performance Contracts (Super ESPCs) developed by the U.S. Department of Energy's Federal Energy Management Program (FEMP).

438

No Slide Title  

Broader source: Energy.gov (indexed) [DOE]

Successful Risk Management Successful Risk Management Lessons Learned from the Spallation Neutron Source Suzanne Herron U.S. ITER Deputy Project Manager Former SNS Project Controls Manager The Spallation Neutron Source (SNS) achieved world-class objectives * Construction completed ahead of schedule (June 2006) and under budget ($1.411B) * World's leading facility for neutron science * Room for eventual 25 instruments spanning physics, chemistry, biology, and materials science * Upgradeable to higher power, second target SNS was a partnership among six national labs and a major industrial partner SNS partners owned major scope, budget, and risk! Total Project $1411.7M Argonne National Laboratory Brookhaven National Laboratory Thomas Jefferson National Accelerator Laboratory Legend ANL 45.6 BNL 137.1

439

Title IX | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

IX IX Title IX Title IX of the Education Amendments of 1972, as amended, prohibits discrimination on the basis of sex in all educational programs and activities of institutions that receive federal financial assistance. The law states, in part, that: No person in the United States shall, on the basis of sex, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any education program or activity receiving federal financial assistance. Click here to learn more: 20 U.S.C. § 1681(a) The Office of Civil Rights is responsible for monitoring and enforcing compliance with Title IX, investigating Title IX-related complaints, and providing technical assistance related to Title IX to recipients of Department of Energy financial assistance.

440

INSERT PRESENTATION TITLE HERE  

Broader source: Energy.gov (indexed) [DOE]

S. Department of Energy S. Department of Energy National Electric Transmission Congestion Study Workshop Saint Louis, Missouri December 8, 2011 Maureen A. Borkowski President & CEO, Ameren Transmission Company 2 CONGESTION IN THE MIDWEST * Midwest ISO performs regular congestion studies looking at historical and expected future congestion - Top Congested Flowgate Study - Cross-Border Congested Flowgates (with PJM) * Significant congestion exists in several areas - Southeast Missouri, Southern Illinois and Indiana - Chicago area, Southern Wisconsin and Northern Indiana surrounding Lake Michigan - Indiana and Kentucky border * Historically, dozens of transmission projects were evaluated to mitigate congestion on the top congested flowgates - RECB II Benefit/Cost Threshold was used - Only one small project passed the criteria

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

FUELS NETL Team Technical Coordinator: Dirk Link Name Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NETL Team Technical Coordinator: Dirk Link NETL Team Technical Coordinator: Dirk Link Name Title Affiliation Dogan, Omer N Materials Research Eng NETL Haynes, Daniel ST (Chem Eng) NETL How ard, Bret H Research Chemist NETL Link, Dirk D Research Chemist NETL Morreale, Bryan D General Engineer NETL Poston, James A Physicist NETL Shekhaw at, Dushyant General Engineer NETL Smith, David K Physical Science Tech NETL Sorescu, Dan C Research Physicist NETL Ciocco, Mike Project Lead URS Smith, Mark Project Lead URS Abdelsayed, Victor Research Scientist URS Floyd, Donald Scientist URS Smith, Mark Research Engineer URS Name Project Role Affiliation University Project Title Veser, Goetz PI Pitt Task 221 Development of Catalysts for Coal-gas Component Conversion Enick, Robert M PI Pitt Task 331 Membrane Reaction Process for Conversion of Coal-Gas Components

442

3rd year final contractor report for: U.S. Department of Energy Stewardship Science Academic Alliances Program Project Title: Detailed Measurements of Rayleigh-Taylor Mixing at Large and Small Atwood Numbers  

SciTech Connect (OSTI)

This project had two major tasks: Task 1. The construction of a new air/helium facility to collect detailed measurements of Rayleigh-Taylor (RT) mixing at high Atwood number, and the distribution of these data to LLNL, LANL, and Alliance members for code validation and design purposes. Task 2. The collection of initial condition data from the new Air/Helium facility, for use with validation of RT simulation codes at LLNL and LANL. This report describes work done in the last twelve (12) months of the project, and also contains a summary of the complete work done over the three (3) life of the project. As of April 1, 2006, the air/helium facility (Task 1) is now complete and extensive testing and validation of diagnostics has been performed. Initial condition studies (Task 2) is also comp lete. Detailed experiments with air/helium with Atwood numbers up to 0.1 have been completed, and Atwood numbers of 0.25. Within the last three (3) months we have been able to successfully run the facility at Atwood numbers of 0.5. The progress matches the project plan, as does the budget. We have finished the initial condition studies using the water channel, and this work has been accepted for publication on the Journal of Fluid Mechanics (the top fluid mechanics journal). Mr. Nick Mueschke and Mr. Wayne Kraft are continuing with their studies to obtain PhDs in the same field, and will also continue their collaboration visits to LANL and LLNL. Over its three (3) year life the project has supported two(2) Ph.D.s and three (3) MScs, and produced nine (9) international journal publications, twenty four (24) conference publications, and numerous other reports. The highlight of the project has been our close collaboration with LLNL (Dr. Oleg Schilling) and LANL (Drs. Dimonte, Ristorcelli, Gore, and Harlow).

Malcolm J. Andrews

2006-04-14T23:59:59.000Z

443

Projects and Savings Back on Track in Virginia City | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Projects and Savings Back on Track in Virginia City Projects and Savings Back on Track in Virginia City Projects and Savings Back on Track in Virginia City July 21, 2010 - 12:21pm Addthis Roanoke, Va., is using Recovery Act money to fund four energy-efficiency projects. | Photo courtesy City of Roanoke Roanoke, Va., is using Recovery Act money to fund four energy-efficiency projects. | Photo courtesy City of Roanoke Joshua DeLung Roanoke, Va., is nestled in the Blue Ridge Mountains amidst the farms and fields along Interstate 81 in southwestern Virginia. With budget cuts, the city put projects on hold. Now, with a $963,700 Energy Efficiency and Conservation Block Grant awarded through the U.S. Department of Energy and the American Recovery and Reinvestment Act, a stalled project is moving ahead and the city is looking at $86,000 in annual energy savings and

444

SciTech Connect: The Mesaba Energy Project: Clean Coal Power...  

Office of Scientific and Technical Information (OSTI)

The Mesaba Energy Project: Clean Coal Power Initiative, Round 2 Citation Details In-Document Search Title: The Mesaba Energy Project: Clean Coal Power Initiative, Round 2 The...

445

Main Title 32pt  

Broader source: Energy.gov (indexed) [DOE]

Joint Energy Storage Joint Energy Storage Initiative November 2, 2010 Georgianne Huff Sandia National Laboratories Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. Cooperation on ESS projects in New York * Demonstrate electric energy storage for increasing reliability and for electric energy management to be: - technically viable - cost-effective - broadly applicable Start: FY2005 DOE/NYSERDA MOU DOE/Sandia Activities * Assist in project selection process * Data Acquisition System Management - - EnerNex * Data and Economic Analysis - - Distributed Utilities Associates

446

No Slide Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wheat Ridge, CO 80033 * www.tda.com Wheat Ridge, CO 80033 * www.tda.com A Low Cost, High Capacity Regenerable Sorbent for Pre-Combustion CO 2 Capture Contract No: DE-FE0000469 Principal Investigator Gökhan Alptekin, PhD DOE Project Manager Ms. Sara Zenner Project Kick-off Meeting NETL, Pittsburgh, PA November 12, 2009 TDA R e s e a r c h 2  Privately Owned / Began operations in 1987  ~13 million revenue in 2009  84 full-time technical staff  Primarily chemists and engineers, more than half with advanced degrees (26 PhDs) TDA Research, Inc. Wheat Ridge Facility Golden Facility 12345-12355 W 52 nd Avenue 22,000 ft 2 offices and labs Synthetic Chemistry, Catalyst/Sorbent Synthesis and Testing, Machine and Electronics Shops, SEM, TOF Mass Spec 4663 Table Mountain Drive 27,000 ft 2 offices and labs

447

No Slide Title  

Broader source: Energy.gov (indexed) [DOE]

BROOKHAVEN SCIENCE ASSOCIATES BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Risk Management Diane Hatton Associate Director, NSLS-II Project Support Division, BNL November 4, 2009 2 BROOKHAVEN SCIENCE ASSOCIATES Risk Management Steps * identify potential vulnerabilities/risks * determine their likelihood of occurring * assess their impact on the project technical, cost, and schedule baselines * determine activities that would reduce/mitigate the risk Consolidated risk entries to manageable numbers * execute a plan to accomplish these risk-reducing activities * risk reporting/tracking STEP 1 3 BROOKHAVEN SCIENCE ASSOCIATES Risk Management Steps * Bottom up Risk Analysis produced 407 Risk Register Entries * Mixture of risks (can be mitigated) and uncertainties (things beyond our control) * Repetition and redundancy (e.g. higher than usual inflation and exchange rate, out-year

448

US Recovery Act Smart Grid Projects - Equipment Manufacturing | Open Energy  

Open Energy Info (EERE)

Georgia_System_Operations_Corporation_Inc._Smart_Grid_Project\" Georgia_System_Operations_Corporation_Inc._Smart_Grid_Project\" title=\"Georgia System Operations Corporation Inc. Smart Grid Project\">Georgia System Operations Corporation Inc. Smart Grid Project","title":"Georgia System Operations Corporation Inc. Smart Grid Project","link":null,"lat":33.8545479,"lon":-84.2171424,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""},{"text":"Project\" title=\"Whirlpool Corporation Smart Grid Project\">Whirlpool Corporation Smart Grid

449

US Recovery Act Smart Grid Projects - Electric Transmission Systems | Open  

Open Energy Info (EERE)

American_Transmission_Company_LLC_II_Smart_Grid_Project\" American_Transmission_Company_LLC_II_Smart_Grid_Project\" title=\"American Transmission Company LLC II Smart Grid Project\">American Transmission Company LLC II Smart Grid Project","title":"American Transmission Company LLC II Smart Grid Project","link":null,"lat":43.0116784,"lon":-88.2314813,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""},{"text":"Project\" title=\"American Transmission Company LLC Smart Grid Project\">American

450

PECO-ELIGIBLE PROJECT REQUESTS Academic or Net Gross Project Cost Educational Approved by  

E-Print Network [OSTI]

PECO-ELIGIBLE PROJECT REQUESTS Academic or Net Gross Project Cost Educational Approved by 2013 Priority to Benefit Square Feet Feet Project (Proj. Cost/ Recommended reference No Project Title Year 1 Year 2 Year 3 Year 4 Year 5 from Projects (NASF) (GSF) Cost GSF) Date/Rec No. 1 UTILITIES

Slatton, Clint

451

PECO-ELIGIBLE PROJECT REQUESTS Academic or Net Gross Project Cost Educational Approved by  

E-Print Network [OSTI]

PECO-ELIGIBLE PROJECT REQUESTS Academic or Net Gross Project Cost Educational Approved by 2014 Priority to Benefit Square Feet Feet Project (Proj. Cost/ Recommended reference No Project Title Year 1 Year 2 Year 3 Year 4 Year 5 from Projects (NASF) (GSF) Cost GSF) Date/Rec No. 1 UTILITIES

Slatton, Clint

452

PECO-ELIGIBLE PROJECT REQUESTS Academic or Net Gross Project Cost Educational Approved by  

E-Print Network [OSTI]

PECO-ELIGIBLE PROJECT REQUESTS Academic or Net Gross Project Cost Educational Approved by 2015 Priority to Benefit Square Feet Feet Project (Proj. Cost/ Recommended reference No Project Title Year 1 Year 2 Year 3 Year 4 Year 5 from Projects (NASF) (GSF) Cost GSF) Date/Rec No. 1 UTILITIES

Slatton, Clint

453

Canby Cascaded Project Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Canby Cascaded Project Geothermal Project Canby Cascaded Project Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Canby Cascaded Project Geothermal Project Project Location Information Coordinates 41.443888888889°, -120.87027777778° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.443888888889,"lon":-120.87027777778,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

454

Title VI | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

VI VI Title VI Title VI of the Civil Rights Act of 1964 prohibits discrimination on the basis of race, color, and national origin in programs and activities that receive federal financial assistance. The law states, in part, that: No person in the United States shall, on the ground of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving Federal financial assistance. The Office of Civil Rights is responsible for monitoring and enforcing compliance with Title VI, investigating Title VI-related complaints, and providing technical assistance to recipients of Department of Energy financial assistance. The Department has promulgated regulations that

455

Session Title Climate Smart Agriculture  

E-Print Network [OSTI]

Session Title Climate Smart Agriculture Session Date Khosla (moderator) Professor, Soil and Crop Sciences College of Agricultural Climate Smart Agriculture is a multi-disciplinary approach to practice agriculture

Barnes, Elizabeth A.

456

No Slide Title  

Broader source: Energy.gov (indexed) [DOE]

July 23, 2013 July 23, 2013 Office of the Under Secretary for Nuclear Security Edward B. Held (Acting) Under Secretary for Nuclear Security DEPARTMENT OF ENERGY Office of the Under Secretary for Management & Performance Vacant Under Secretary Office of the Under Secretary for Science & Energy Vacant Under Secretary for Science Southwestern Power Administration Bonneville Power Administration Western Area Power Administration Southeastern Power Administration U.S. Energy Information Administration Loan Programs Office Advanced Research Projects Agency - Energy General Counsel Assistant Secretary for Congressional & Intergovernmental Affairs Chief Human Capital Officer Chief Financial Officer

457

[Presenter's Name] [Presenter's Title]  

Broader source: Energy.gov (indexed) [DOE]

Byron Woertz Byron Woertz Senior Project Manager Transmission Planning in the West February 8, 2012 Tribal Leader Forum Series, Denver, CO 2 * What is WECC? * What is RTEP? * 2011 10-Year Regional Transmission Plan * 2013 10-Year Regional Transmission Plan * 2013 20-Year Regional Transmission Target Plan * Opportunities for Tribal Participation Today's Discussion 3 "My interest is in the future because I am going to spend the rest of my life there." ...Charles Kettering Why Transmission Planning? 4 What is WECC? 5 * Transmission Expansion Planning Policy Committee (TEPPC)-April, 2006 o Annual study program o Transmission expansion studies

458

No Slide Title  

Broader source: Energy.gov (indexed) [DOE]

August 7, 2013 August 7, 2013 Office of the Under Secretary for Nuclear Security Edward B. Held (Acting) Under Secretary for Nuclear Security DEPARTMENT OF ENERGY Office of the Under Secretary for Management & Performance Vacant Under Secretary Office of the Under Secretary for Science & Energy Vacant Under Secretary for Science Southwestern Power Administration Bonneville Power Administration Western Area Power Administration Southeastern Power Administration U.S. Energy Information Administration Loan Programs Office Advanced Research Projects Agency - Energy General Counsel Assistant Secretary for Congressional & Intergovernmental Affairs Chief Human Capital Officer Chief Financial Officer

459

No Slide Title  

Broader source: Energy.gov (indexed) [DOE]

Roy Long, Technology Manager, NETL Roy Long, Technology Manager, NETL UDAC Meeting, February 23, 2011, Washington, D.C. Oil and Gas Program Overview February 23, 2011 2 Outline Introduction Traditional O&G Program Overview  O&G Projects Summary  Stripper Well Consortium Highlight Integrated Technology Transfer Program  Structure  Publications  Knowledge Management Database (KMD) 3 NETL Applies Basic Science to Technology Development, Demonstration, & Deployment Onsite Research & Development Systems, Analyses, & Planning Extramural Research & Collaboration Developing the critical science and technology to discover and Commercialize advanced energy systems that efficiently utilize domestic Resources in an environmentally sustainable manner 4 NETL Natural Gas & Oil R&D Program

460

Project Charter Current 8/23/2006  

E-Print Network [OSTI]

Project Charter Current 8/23/2006 Version 2 #12;Page 1 10/12/2006 Document Control Document Title: Project Charter Author(s): CMS Project Team Date By Action Version Pages 8/23/06 SKC Template applied 1.................................................................................................................................. 3 The Central Vision for the Project

de Lijser, Peter

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Title I conceptual design for Pit 6 landfill closure at Lawrence Livermore National Laboratory Site 300  

SciTech Connect (OSTI)

The objective of this design project is to evaluate and prepare design and construction documents for a closure cover cap for the Pit 6 Landfill located at Lawrence Livermore National Laboratory Site 300. This submittal constitutes the Title I Design (Conceptual Design) for the closure cover of the Pit 6 Landfill. A Title I Design is generally 30 percent of the design effort. Title H Design takes the design to 100 percent complete. Comments and edits to this Title I Design will be addressed in the Title II design submittal. Contents of this report are as follows: project background; design issues and engineering approach; design drawings; calculation packages; construction specifications outline; and construction quality assurance plan outline.

MacDonnell, B.A.; Obenauf, K.S. [Golder Associates, Inc., Alameda, CA (United States)

1996-08-01T23:59:59.000Z

462

Webinar: Wind-to-Hydrogen Cost Modeling and Project Findings  

Broader source: Energy.gov [DOE]

Video recording and text version of the webinar titled, Wind-to-Hydrogen Cost Modeling and Project Findings, originally presented on January 17, 2013.

463

Clarence Strait Tidal Energy Project, Tenax Energy Tropical Tidal...  

Open Energy Info (EERE)

Energy Tropical Tidal Test Centre, Jump to: navigation, search 1 Retrieved from "http:en.openei.orgwindex.php?titleClarenceStraitTidalEnergyProject,TenaxEnergyTropica...

464

SciTech Connect: Transportation Energy Futures Series: Projected...  

Office of Scientific and Technical Information (OSTI)

Transportation Energy Futures Series: Projected Biomass Utilization for Fuels and Power in a Mature Market Citation Details In-Document Search Title: Transportation Energy Futures...

465

No Slide Title  

Broader source: Energy.gov (indexed) [DOE]

999 Federal Advisory Committee 999 Federal Advisory Committee Overview of DOE Oil & Gas Program September 9-12, 2008 Guide DeHoratiis Acting Deputy Assistant Secretary Office of Oil and Natural Gas Designated Federal Officer Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Oil and Gas R&D Funding Consortium Program * Ultra-Deepwater $14.963 * Unconventional Gas $13.854 * Small Producer $3.206 * RPSEA administration $3.562 * NETL Oversight $1.875 Complementary Program * Extreme Drilling * Unconventional Oil and EOR * Environmental * Resource Assessment Traditional Program * E&P * Hydrate * Environmental * LNG * RMOTC * Congressional Projects: - Alaska - SWC/GOMH NETL Department of Energy Office of Fossil Energy $37.5 MM $12.5 MM FY09 H: $29.2 MM S: $32.2 MM Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources

466

No Slide Title  

Gasoline and Diesel Fuel Update (EIA)

and Summer Fuels Outlook Guy Caruso Administrator, Energy Information Administration 2006 Summer Transportation Fuels Outlook Conference April 11, 2006 Washington, DC Several Key Factors Drive the Short-Term Fuels Forecast 1) Rising world oil consumption; 2) Low global surplus production capacity and tight crude oil supply relative to demand; 3) Supply concerns in international oil markets (such as in Nigeria, Iraq, and Iran); 4) The challenges of:  Stricter sulfur standards under the Tier 2 Gasoline program;  MTBE phase-out;  A shift to ultra low sulfur diesel. All these factors contribute to higher prices for petroleum products, particularly in the coming months. World Oil Consumption Growth Slowed in 2005; Projected to Increase in 2006-2007 Source: EIA, Short-Term Energy Outlook, April 2006

467

No Slide Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

from DOE's from DOE's Mercury Control Technology Field Testing and Related Projects China Workshop on Mercury Control from Coal Combustion October 31 - November 2, 2005 Beijing, China Thomas J. Feeley, III thomas.feeley@netl.doe.gov National Energy Technology Laboratory China Hg Workshop_Beijing_Nov 3 , 2005 Outline * DOE/NETL's Hg control technology program * Characterization of fly ash * Characterization of FGD solids * Summary/conclusion DOE-NETL CUB Program Goal: 50% Utilization by 2010 0 20 40 60 80 100 120 140 160 1980 1990 2000 2010 Million tons / year Production Production Utilization Utilization Disposal Utilization Production estimate based on implementation of CAIR Phase I Production estimate based on implementation of CAIR Phase I China Hg Workshop_Beijing_Nov 3 , 2005 EPA Regulations Introduce Additional

468

No Slide Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

10 10 These slides are updated on a monthly basis, as soon as data are reasonably final for the preceding month. Hours worked are estimated monthly and updated with final and actual values quarterly. While every effort is made to present accurate and final data, data may change in subsequent months, as additional information becomes available and as later developments change the recordability of some cases. Refer questions about these charts to rwfisher@lbl.gov 2 Narrative of October 2010 Injury/Illness Cases * Guest Student Assistant - Finger contusion - While plumbing additional signal cables in a NIM bin rack the left middle finger struck the blade of one of the cooling fans. * Materials Project Scientist/Engineer - Allergic response - Employee experienced a sudden onset of allergy

469

No Slide Title  

Broader source: Energy.gov (indexed) [DOE]

MA-1 MA-1 Office of Scheduling MA-10 February 3, 2011 Ingrid Kolb, Director Laurie Morman, Chief of Staff MA-40 MA-30 MA-90 Office of Aviation Management Office of Administration Office of Engineering & Construction Management MA-50 Office of Procurement & Assistance Management MA-60 Office of Executive Secretariat MA-70 Office of Information Resources Anthony Rediger,Director Glen Wattman, Director Brian Costlow, Director Paul Bosco, Director Vacant, Director Kevin Hagerty, Director Office of Headquarters Safety, Health and Security MA-41 MA-43 MA-42 Office of Administrative Management and Support Office of Logistics and Facility Operations Deputy Director for Facilities Management Deputy Director for Project Management Rebecca Montoya, Dep. Director Office of Procurement

470

No Slide Title  

Broader source: Energy.gov (indexed) [DOE]

MA-1 MA-1 Office of Scheduling MA-10 February 3, 2011 Ingrid Kolb, Director Laurie Morman, Chief of Staff MA-40 MA-30 MA-90 Office of Aviation Management Office of Administration Office of Engineering & Construction Management MA-50 Office of Procurement & Assistance Management MA-60 Office of Executive Secretariat MA-70 Office of Information Resources Anthony Rediger,Director Glen Wattman, Director Brian Costlow, Director Paul Bosco, Director Vacant, Director Kevin Hagerty, Director Office of Headquarters Safety, Health and Security MA-41 MA-43 MA-42 Office of Administrative Management and Support Office of Logistics and Facility Operations Deputy Director for Facilities Management Deputy Director for Project Management Rebecca Montoya, Dep. Director Office of Procurement

471

No Slide Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 1 These slides are updated on a monthly basis as soon as data are reasonably final for the preceding month. Hours worked are estimated monthly and updated with final and actual values quarterly. Every effort is made to present accurate and final data. However, changes may occur in subsequent months as additional information becomes available and as developments change the recordability of some cases. Refer questions about these charts to rwfisher@lbl.gov 2 Injury/Illness Cases - Slip / Trip / Fall June 2011 * Administrator - Fractured wrist - The employee fell to the parking lot surface while walking. * Project Manager - Contusion of wrist and hand - The employee tripped while ascending exterior wooden staircase (handrail was not used). * Custodian - Ankle sprain

472

Annual Poster Session 2009 Titles and Presenters  

E-Print Network [OSTI]

Kolli Title: Genetic Variation in the Lecane luna from Populations in the Chihuahua desert. 9) Daniel

Fuentes, Olac

473

Implementation of Title V in California  

SciTech Connect (OSTI)

This presentation provides information on California`s Title V operating permit programs for stationary sources mandated by the 1990 Clean Air Act amendments. It covers background, applicability, regulatory history, requirements, and issues. In addition, specific information is provided on the progress of Title V implementation in California, including: the roles of implementing agencies, the status of district Title V programs, number and distribution of Title V sources, cost of Title V implementation, and highlights of Title V implementation in the State. The question and answer format is intended to facilitate easy access to specific information related to the Title V operating permit programs in California.

Werner, B.; Cook, B.

1996-12-31T23:59:59.000Z

474

No Slide Title  

Gasoline and Diesel Fuel Update (EIA)

Fuels Outlook Fuels Outlook Guy Caruso Administrator Energy Information Administration EIA 2008 Energy Conference 30 Years of Energy Information and Analysis April 8, 2008 Washington, DC EIA, Short-Term Energy Outlook, April 2008 1) Rising world oil consumption 2) Low global surplus oil production capacity 3) Insufficient non-OPEC oil supply growth relative to demand 4) Supply concerns in international oil markets Together these factors contribute to high prices for petroleum products. Key Factors Driving the Short-Term Forecast EIA, Short-Term Energy Outlook, April 2008 45 50 55 60 65 70 75 80 85 90 95 2001 2002 2003 2004 2005 2006 2007 2008 Million barrels per day -0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Change from prior year (million barrels per day) China US Other Total Consumption Annual Growth Forecast World Oil Consumption Is Projected to

475

No Slide Title  

Gasoline and Diesel Fuel Update (EIA)

Summer Transportation Summer Transportation Fuels Outlook U.S. Energy Information Administration April 6, 2010 Source: Short-Term Energy Outlook, April 2010 1) Stronger economic recovery in emerging economies 2) High inventories 3) Slowing growth in non-OPEC production 4) Higher OPEC surplus crude oil production capacity Together these factors contribute to relatively stable but rising prices for crude oil and petroleum products. Key factors driving the Short-Term Outlook Source: Short-Term Energy Outlook, April 2010 30 35 40 45 50 55 60 65 70 75 80 85 90 95 2003 2004 2005 2006 2007 2008 2009 2010 -2.5 -1.5 -0.5 0.5 1.5 2.5 3.5 4.5 5.5 China United States Other Total consumption Annual growth Forecast World liquid fuels consumption is projected to increase by 1.5 million bbl/d in 2010 million barrels per day million barrels per day

476

Beowawe Bottoming Binary Project Geothermal Project | Open Energy  

Open Energy Info (EERE)

Beowawe Bottoming Binary Project Geothermal Project Beowawe Bottoming Binary Project Geothermal Project Jump to: navigation, search Last modified on July 22, 2011. Project Title Beowawe Bottoming Binary Project Project Type / Topic 1 Recovery Act: Geothermal Technologies Program Project Type / Topic 2 Geothermal Energy Production from Low Temperature Resources, Coproduced Fluids from Oil and Gas Wells, and Geopressured Resources Project Type / Topic 3 Low Temperature Resources Project Description The proposed two-year project supports the DOE GTP's goal of promoting the development and commercial application of energy production from low-temperature geothermal fluids, i.e., between 150°F and 300°F. State Nevada Objectives Demonstrate the technical and economic feasibility of electricity generation from nonconventional geothermal resources of 205°F using the first commercial use of a cycle at a geothermal power plant inlet temperature of less than 300°F.

477

Final Report for project titled "New fluoroionomer electrolytes with high conductivity and low SO2 crossover for use in electrolyzers being developed for hydrogen production from nuclear power plants"  

SciTech Connect (OSTI)

Thermochemical water splitting cycles, using the heat of nuclear power plants, offer an alternate highly efficient route for the production of hydrogen. Among the many possible thermochemical cycles for the hydrogen production, the sulfur-based cycles lead the competition in overall energy efficiency. A variant on sulfur-based thermochemical cycles is the Hybrid Sulfur (HyS) Process, which uses a sulfur dioxide depolarized electrolyzer (SDE) to produce hydrogen. The Savannah River National Laboratory (SRNL) selected the fuel cell MEA design concept for the SDE in the HyS process since the MEA concept provides a much smaller cell footprint than conventional parallel plate technology. The electrolyzer oxidizes sulfur dioxide to form sulfuric acid at the anode and reduces protons to form hydrogen at the cathode. The overall electrochemical cell reaction consists of the production of H{sub 2}SO{sub 4} and H{sub 2}. There is a significant need to provide the membrane materials that exhibit reduced sulfur dioxide transport characteristics without sacrificing other important properties such as high ionic conductivity and excellent chemical stability in highly concentrated sulfuric acid solutions saturated with sulfur dioxide. As an alternative membrane, sulfonated Perfluorocyclobutyl aromatic ether polymer (sPFCB) were expected to posses low SO2 permeability due to their stiff backbones as well as high proton conductivity, improved mechanical properties. The major accomplishments of this project were the synthesis, characterizations, and optimizations of suitable electrolyzers for good SDE performance and higher chemical stability against sulfuric acid. SDE performance results of developed sPFCB polyelectrolytes have shown that these membranes exhibit good chemical stability against H{sub 2}SO{sub 4}.

Dennis W. Smith; Stephen Creager

2012-09-13T23:59:59.000Z

478

FY 2007-09 Project Selection, Section 10 1 Project ID: 1991-019-01  

E-Print Network [OSTI]

FY 2007-09 Project Selection, Section 10 1 Project ID: 1991-019-01 Title: Hungry Horse Mitigation/Flathead Lake Confederated Salish and Kootenai Tribes A. Abstract This project was initiated in 1992 after NPCC annual funding since that time. This project specifically addresses the losses on the Flathead Indian

479

12th International Conference on Nuclear Engineering Arlington, VA, April 25-29, 2004  

E-Print Network [OSTI]

that the nuclear reactor sector has acquired over the years. Keywords: Irradiation, beam targets, high-power proton1 12th International Conference on Nuclear Engineering Arlington, VA, April 25-29, 2004 ICONE12 Laboratory, UPTON NY 11973, USA 2 Princeton University, Princeton, NJ, USA 3 KEK, Tsukuba, Japan simos

McDonald, Kirk

480

Matching between Reaction and Catalyst Conditions in Growing VA-SWNTs by ACCVD  

E-Print Network [OSTI]

Matching between Reaction and Catalyst Conditions in Growing VA-SWNTs by ACCVD Hisashi Sugime1 of the catalyst nanoparticles is a crucial issue. Co-Mo binary catalysts effectively grow SWNTs either from CO [1/3 for the former [1] and 1.6/1 for the latter [2]. The structure of catalyst nanoparticles should be determined

Maruyama, Shigeo

Note: This page contains sample records for the topic "va project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Energy Secretary Moniz's Remarks at Hampton University in Hampton, Va.-- As Prepared for Delivery  

Broader source: Energy.gov [DOE]

Today, Secretary of Energy Ernest Moniz traveled to Hampton Roads, Va. to highlight President Obamas State of the Union address at Hampton University, one of the nations top historically black universities and a leader in science, technology, engineering and math (STEM) education.

482

Economic Impact of the ACESA of 2009 on the W.Va. Economy 1 Policy Brief  

E-Print Network [OSTI]

Economic Impact of the ACESA of 2009 on the W.Va. Economy 1 Policy Brief: Economic Impact.D. Bureau of Business and Economic Research College of Business and Economics West Virginia University May concern over the effects of the current recession. The ARRA was designed to spur economic activity

Mohaghegh, Shahab

483

ADELE Project AACAES (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

ADELE Project AACAES (Smart Grid Project) ADELE Project AACAES (Smart Grid Project) Jump to: navigation, search Project Name ADELE Project AACAES Country Germany Coordinates 51.165691°, 10.451526° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.165691,"lon":10.451526,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

484

Demonstration project Smart Charging (Smart Grid Project) | Open Energy  

Open Energy Info (EERE)

project Smart Charging (Smart Grid Project) project Smart Charging (Smart Grid Project) Jump to: navigation, search Project Name Demonstration project Smart Charging Country Netherlands Headquarters Location Noord-Brabant, Netherlands Coordinates 51.482655°, 5.232169° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.482655,"lon":5.232169,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

485

DataHub project (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

DataHub project (Smart Grid Project) DataHub project (Smart Grid Project) Jump to: navigation, search Project Name DataHub project Country Denmark Headquarters Location Fredericia, Denmark Coordinates 55.570332°, 9.746595° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.570332,"lon":9.746595,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

486

ESB Smart Meter Projects (Smart Grid Project) (Limerick, Ireland) | Open  

Open Energy Info (EERE)

Projects (Smart Grid Project) (Limerick, Ireland) Projects (Smart Grid Project) (Limerick, Ireland) Jump to: navigation, search Project Name ESB Smart Meter Projects Country Ireland Headquarters Location Limerick, Ireland Coordinates 52.663857°, -8.626773° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":52.663857,"lon":-8.626773,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

487

DSOpilot project (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

DSOpilot project (Smart Grid Project) DSOpilot project (Smart Grid Project) Jump to: navigation, search Project Name DSOpilot project Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

488

Administration Policy Complete Policy Title  

E-Print Network [OSTI]

Administration Policy Complete Policy Title: McMaster University Alcohol Policy Policy Number, 1998 Supersedes/Amends Policy dated: May 11, 1998 Responsible Executive: Vice-President (Administration policy and the written copy held by the policy owner, the written copy prevails. INTRODUCTION Mc

Haykin, Simon

489

Title Slide "Memorability and Invisibility  

E-Print Network [OSTI]

Title Slide 2002- "Memorability and Invisibility: A tale of two alarm clocks and other stories from. Disclaimer #12;v. 1.1, 26/Aug/2002, (slide 1 - 3). © L.Hatton, 2001- O Memorability and invisibility Mobile phone tariffs O Memorability and invisibility for defects: the dark side Overview #12;v. 1.1, 26

Hatton, Les

490

DOE Spent Nuclear Fuel Information In Support of TSPA-VA  

SciTech Connect (OSTI)

RW has started the viability assessment (VA) effort to determine the feasibility of Yucca Mountain as the first geologic repository for spent nuclear fuel (SNF) and high-level waste. One component of the viability assessment will be a total system performance assessment (TSPA), based on the design concept and the scientific data and analysis available, describing the repository's probable behavior relative to the overall system performance standards. Thus, all the data collected from the Exploratory Studies Facility to-date have been incorporated into the latest TSPA model. In addition, the Repository Integration Program, an integrated probabilistic simulator, used in the TSPA has also been updated by Golder Associates Incorporated at December 1997. To ensure that the Department of Energy-owned (DOE-owned) SNF continues to be acceptable for disposal in the repository, it will be included in the TSPA-VA evaluation. A number of parameters are needed in the TSPA-VA models to predict the performance of the DOE-owned SNF materials placed into the potential repository. This report documents all of the basis and/or derivation for each of these parameters. A number of properties were not readily available at the time the TSPA-VA data was requested. Thus, expert judgement and opinion was utilized to determine a best property value. The performance of the DOE-owned SNF will be published as part of the TSPA-VA report. Each DOE site will be collecting better data as the DOE SNF program moves closer to repository license application. As required by the RW-0333P, the National Spent Nuclear Fuel Program will be assisting each site in qualifying the information used to support the performance assessment evaluations.

A. Brewer; D. Cresap; D. Fillmore; H. Loo; M. Ebner; R. McCormack

1998-09-01T23:59:59.000Z

491

Final Scientific/Technical Report, USDOE Award DE-FG-02ER54684, Recipient: CompX, Project Title: Fokker-Planck/Ray Tracing for Electron Bernstein and Fast Wave Modeling in Support of NSTX.  

SciTech Connect (OSTI)

This DOE grant supported fusion energy research, a potential long-term solution to the world's energy needs. Magnetic fusion, exemplified by confinement of very hot ionized gases, i.e., plasmas, in donut-shaped tokamak vessels is a leading approach for this energy source. Thus far, a mixture of hydrogen isotopes has produced 10's of megawatts of fusion power for seconds in a tokamak reactor at Princeton Plasma Physics Laboratory in New Jersey. The research grant under consideration, ER54684, uses computer models to aid in understanding and projecting efficacy of heating and current drive sources in the National Spherical Torus Experiment, a tokamak variant, at PPPL. The NSTX experiment explores the physics of very tight aspect ratio, almost spherical tokamaks, aiming at producing steady-state fusion plasmas. The current drive is an integral part of the steady-state concept, maintaining the magnetic geometry in the steady-state tokamak. CompX further developed and applied models for radiofrequency (rf) heating and current drive for applications to NSTX. These models build on a 30 year development of rf ray tracing (the all-frequencies GENRAY code) and higher dimensional Fokker-Planck rf-collisional modeling (the 3D collisional-quasilinear CQL3D code) at CompX. Two mainline current-drive rf modes are proposed for injection into NSTX: (1) electron Bernstein wave (EBW), and (2) high harmonic fast wave (HHFW) modes. Both these current drive systems provide a means for the rf to access the especially high density plasma--termed high beta plasma--compared to the strength of the required magnetic fields. The CompX studies entailed detailed modeling of the EBW to calculate the efficiency of the current drive system, and to determine its range of flexibility for driving current at spatial locations in the plasma cross-section. The ray tracing showed penetration into NSTX bulk plasma, relatively efficient current drive, but a limited ability to produce current over the whole radial plasma cross-section. The actual EBW experiment will cost several million dollars, and remains in the proposal stage. The HHFW current drive system has been experimentally implemented on NSTX, and successfully drives substantial current. The understanding of the experiment is to be accomplished in terms of general concepts of rf current drive, and also detailed modeling of the experiment which can discern the various competing processes which necessarily occur simultaneously in the experiment. An early discovery of the CompX codes, GENRAY and CQL3D, was that there could be significant interference between the neutral beam injection fast ions in the machine (injected for plasma heating) and the HHFW energy. Under many NSTX experimental conditions, power which could go to the fast ions would then be unavailable for current drive by the desired HHFW interaction with electrons. This result has been born out by experiments; the modeling helps in understanding difficulties with HHFW current drive, and has enabled adjustment of the experiment to avoid interaction with neutral beam injected fast ions thereby achieving stronger HHFW current drive. The detailed physics modeling of the various competing processes is almost always required in fusion energy plasma physics, to ensure a reasonably accurate and certain interpretation of the experiment, enabling the confident design of future, more advanced experiments and ultimately a commercial fusion reactor. More recent work entails detailed investigation of the interaction of the HHFW radiation for fast ions, accounting for the particularly large radius orbits in NSTX, and correlations between multiple HHFW-ion interactions. The spherical aspect of the NSTX experiment emphasized particular physics such as the large orbits which are present to some degree in all tokamaks, but gives clearer clues on the resulting physics phenomena since competing physics effects are reduced.

R.W. Harvey, CompX, Del Mar, CA 92014

2009-11-12T23:59:59.000Z

492

Project Submission Template  

Broader source: Energy.gov (indexed) [DOE]

International Cooperation International Cooperation Project Title: Country/Organizations: Foreign: Foreign POC: U.S: U.S. POC: Technology Area: Scope of Collaborative Research and Development: Justification of Approach: Work Completed to Date: Overview of Proposed Scope for FY12: Summary Brief Description of Specific Project(s): Timeline: Estimated Cost: Status: CONTINUATION or NEW? Type of Contracting Instrument: (Int'l agreements, lab-lab agreement, etc) Participant Organizations General Scope Budget Foreign (Technical Scope) US (Overhead rate) (Technical Scope) TOTAL Budget Breakdown: Overhead rates and experimental work: APPROVE ____________________ DISAPPROVE ____________________ Approving Official: Associate PDAS, Alice Williams, EM-2.1

493

PROJECT PLANNING TEMPLATE  

Broader source: Energy.gov (indexed) [DOE]

Plan i Issue Date: 4/24/2009 Plan i Issue Date: 4/24/2009 U.S. Department of Energy Office of Engineering and Construction Management Project Plan for the Project Assessment and Reporting System (PARS II) Version 2.0a (Public) April 20, 2009 Submitted by: Energy Enterprises Solutions 20440 Century Blvd. Suite 150 Germantown, MD 20874 Phone 301-916-0050 Fax 301-916-0066 www.eesllc.net PARS II Project Plan ii Issue Date: 4/24/2009 Title Page Document Name: Project Plan for the Project Assessment and Reporting System (PARS II), V2.0a Publication Date: April 24, 2009 Contract Number: DE-AT01-06IM00102 Project Number: 1ME07, CLIN 2 Prepared by: Judith Bernsen, PMC, LLC Kai Mong, Energy Enterprise Solutions, LLC

494

Category:OpenEI Projects | Open Energy Information  

Open Energy Info (EERE)

Oil and Gas P cont. OpenEI:ProjectsPublic Resources OpenEI:ProjectsSearch Engine Optimization Retrieved from "http:en.openei.orgwindex.php?titleCategory:OpenEIProjects&old...

495

REQUEST FOR INDIRECT COST WAIVER I. Project Director  

E-Print Network [OSTI]

REQUEST FOR INDIRECT COST WAIVER I. Project Director: Department: Project Title: Project Sponsor without fully recovering the institutional indirect costs which will be incurred in conducting the project COSTS 1. FULL: OF I. A. C. 2. PARTIAL: OF H. B. K. TOTAL PROJECT COSTS L. INDIRECT COSTS TO BE WAIVED, J

Krovi, Venkat

496

Project Year Project Team  

E-Print Network [OSTI]

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

497

Residential Lighting: Title 24 and Technology Update  

E-Print Network [OSTI]

Residential Lighting: Title 24 and Technology Update Best practices in lighting design to comply the development and deployment of energy-efficient lighting and daylighting technologies in partnership. Effectively apply the residential Title 24 Building Energy Efficiency Standards requirements specific

California at Davis, University of

498

Project Year Project Team  

E-Print Network [OSTI]

(Karl) Zhang, Undergraduate Student, Biomedical Engineering, Whiting School of Engineering; Cheryl Kim Audio, Digital Video Project Abstract The goal of this project is to develop online modular units

Gray, Jeffrey J.

499

Research Highlights Sorted by Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Title Title "Invisible" Giants in the Sky ARM ASR Kassianov, E. "Radiance Assimilation" Correction Method Improves Water Vapor Radiosonde Observations in the Upper Troposphere ARM Soden, B. J. "Roobik" Is Part of the Answer, Not a Puzzle ARM Turner, D. D. 2007 Floods Not a Complete Washout in U.S. Great Plains ARM ASR Bhattacharya, A. A "Little" Respect: Droplet Nucleation Finally Included in Global Climate Model ARM Ghan, S. J. A Bulk Parameterization of Giant Cloud Condensation Nuclei ARM Kogan, Y. A Climatology of Midlatitude Continental Cloud Properties and Their Impact on the Surface Radiation Budget ARM Dong, X. A Comparison of Integrated Water Vapor Sensors: WVIOP-96 ARM Liljegren, J. C. A Consistency Analysis of ARESE Aircraft Measurements ARM

500

Practical experience with Title V  

SciTech Connect (OSTI)

Having prepared numerous Title V permit applications and applications for synthetic minor status, the do`s and don`ts of this experience are evaluated. The philosophy for what goes into the application is reviewed, with special regard to the EPA {open_quotes}White Paper{close_quotes} on streamlining the process. The pros and cons of accepting and applying for synthetic minor status are evaluated.

Hoffnagle, G.F. [TRC Environmental, Windsor, CT (United States)

1996-12-31T23:59:59.000Z