Sample records for utility service options

  1. Mandatory Utility Green Power Option

    Broader source: Energy.gov [DOE]

    In Montana, regulated electric utilities are required to offer customers the option of purchasing electricity generated by certified, environmentally-preferred resources that include, but are not...

  2. Mandatory Utility Green Power Option

    Broader source: Energy.gov [DOE]

    All electric utilities operating in Iowa, including those not rate-regulated by the Iowa Utilities Board (IUB), are required to offer green power options to their customers. These programs allow...

  3. Mandatory Utility Green Power Option

    Broader source: Energy.gov [DOE]

    Legislation enacted in 2009 directed the Maine Public Utilities Commission (PUC) to develop a program offering green power as an option to residential and small commercial customers in the state....

  4. Mandatory Utility Green Power Option

    Broader source: Energy.gov [DOE]

    In May 2001, Washington enacted legislation (EHB 2247) that requires all electric utilities serving more than 25,000 customers to offer customers the option of purchasing renewable energy. Eligible...

  5. Utility Data Collection Service

    Broader source: Energy.gov [DOE]

    Presentation covers the utility data collection service and is given at the FUPWG 2006 Spring meeting, held on May 3-4, 2006 in Atlanta, Georgia.

  6. Utility Energy Service Contracts

    Broader source: Energy.gov [DOE]

    Utility energy service contracts (UESCs) offer Federal agencies an effective means to implement energy-efficiency, renewable-energy, and water-efficiency projects.

  7. Utility Service Renovations

    Broader source: Energy.gov [DOE]

    Any upgrade to utility service provides an opportunity to revisit a Federal building's electrical loads and costs, but it also may provide an economic way to bundle the upgrade with an onsite renewable electricity project during renovation. Upgrading utility service to the site may involve improving or adding a transformer, upgrading utility meters, or otherwise modifying the interconnection equipment or services with the utility. In some cases, the upgrade may change the tariff structure for the facility and may qualify the property for a different structure with lower overall costs. In all cases, the implementation of renewable energy technologies should be identified during the design phase.

  8. Mandatory Utility Green Power Option

    Broader source: Energy.gov [DOE]

    In addition to meeting the requirements of the state [http://www.dsireusa.org/library/includes/incentive2.cfm?Incentive_Code=N... renewables portfolio standard], New Mexico investor-owned utilities...

  9. Statement of Work - Optional Service Offerings for Contractor...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work - Optional Service Offerings for Contractor-Identified Project Statement of Work - Optional Service Offerings for Contractor-Identified Project Spreadsheet features optional...

  10. EIS-0123: Direct Service Industry Options

    Broader source: Energy.gov [DOE]

    BPA proposes to implement one or more options to reduce load fluctuations and revenue uncertainty resulting from its electrical service to 10 aluminum smelters and its other direct service industrial customers. BPA believes these options will give BPA greater ability to plan for power needs and help to maintain its relatively strong financial position during the current period of power surplus. They also are expected to enhance BPA's ability to repay the U.S. Treasury. In turn, BPA rates to other customers would stabilize.

  11. Mandatory Green Power Option for Large Municipal Utilities

    Broader source: Energy.gov [DOE]

    Municipal electric utilities serving more than 40,000 customers in Colorado must offer an optional green-power program that allows retail customers the choice of supporting emerging renewable...

  12. Natural Gas Utilities Options Analysis for the Hydrogen Economy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    > Natural Gas Utilities Options Analysis for the Hydrogen Economy Hydrogen Pipeline R&D Project Review Meeting 6 January 2005 Oak Ridge National Laboratory Oak Ridge, TN Mark E....

  13. Ocala Utility Services- Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Ocala Utility Services Electric and Telecommunications is a community owned utility that serves around 50,000 customers in Ocala and Marion County area. Ocala Utility Services offers rebates on A/C...

  14. General Services Administration Public Utility Contracting

    Broader source: Energy.gov [DOE]

    Presentation—given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meeting—discusses the government utility bill, utility service characteristics, utility energy service contract (UESC) requirements, supplier diversity requirement, subcontracting plan requirements, reporting requirements, and the Subcontracting Orientation and Assistance Reviews (SOARs).

  15. Combining Financial Double Call Options with Real Options for Early Curtailment of Electricity Service

    E-Print Network [OSTI]

    Combining Financial Double Call Options with Real Options for Early Curtailment of Electricity@IEOR.Berkeley.edu Abstract In a competitive electricity market traditional demand side management options offering customers curtailable service at reduced rates are replaced by voluntary customer responses to electricity spot prices

  16. Types of Utility Energy Service Contracts

    Broader source: Energy.gov [DOE]

    Several types of contracts are used as utility energy service contracts (UESCs). Many agency sites procure electricity services under a contract with the local utility, and most of these contracts have provisions that can also cover energy efficiency projects. Agencies not covered by such agreements may enter contracts with the utility for the sole purpose of implementing energy projects.

  17. Financing for Utility Energy Service Contracts

    Broader source: Energy.gov [DOE]

    Financing is a significant portion of utility energy service contract (UESC) costs. Experience shows several things the Federal Government can do to get the best value by reducing UESC financial transaction costs and interest.

  18. Statement of Work- Optional Service Offerings for Contractor-Identified Project

    Broader source: Energy.gov [DOE]

    Spreadsheet features optional Federal Energy Management Program (FEMP) services for energy savings performance contracts (ESPCs).

  19. Utility Energy Service Contract Contacts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contacts Utility Energy Service Contract Contacts For more information about utility energy service contracts, contact: Contact Organization David McAndrew 202-586-7722 Federal...

  20. RTP as an Optional Service: It's Alive, But Is It Well?

    SciTech Connect (OSTI)

    Goldman, Charles; Barbose, Galen; Neenan, Bernie

    2006-03-10T23:59:59.000Z

    Economists have advocated for real-time pricing (RTP) of electricity on the basis of the gains in economic efficiency that would result from charging customers the contemporaneous marginal cost of supplying electricity instead of the average cost. In recent years, RTP has also become the subject of interest in a variety of policy contexts, including integrated resource planning initiatives, ongoing efforts to improve efficiency and reliability in competitive electricity markets, and implementation of default service in states with retail choice. Most experience with RTP has been as an optional service, that is, a self-selecting alternative to the standard utility service. By our count, approximately 70 utilities in the U.S. offered an optional RTP program at some point over the past 20 years. However, many programs are now defunct. In 2003, 47 utilities in the U.S. were still offering an optional RTP program, on either a pilot or permanent basis (see Figure 1). In addition, 10 utilities in states with retail choice currently offer RTP as the default service for large customers that are not under contract with a competitive supplier. Another two utilities have received regulatory approval to do so in the next few years. Although the results of a few optional RTP programs have been publicized, the vast majority of programs have operated in relative obscurity. To provide a wider perspective on utility and customer experience with RTP, we surveyed 43 optional RTP programs offered in 2003. We interviewed RTP program managers and other utility staff, and reviewed publicly available sources, including key regulatory documents and program evaluations. Based on this research, we identified trends related to RTP program history and outlook, program design and implementation, customer participation, and participant price response. The results are both surprising and instructive. We conclude that RTP is indeed alive but is not prospering as well it could. Thus, we offer a number of recommendations for policymakers and utilities that are considering optional RTP as a strategy for developing price responsive demand.

  1. Natural Gas Utilities Options Analysis for the Hydrogen

    E-Print Network [OSTI]

    or service contract ­ Selling other types of energy services that qualify (e.g. hydrogen/renewables synergies

  2. Quick Guide: Utility Energy Services Contracting (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2009-07-01T23:59:59.000Z

    Summarized guide to conducting Federal energy management projects through utility energy services contracts.

  3. Energy Analysis and Energy Conservation Option for the Warehouse Facility at the Human Services Center Complex

    E-Print Network [OSTI]

    Farzad, M.; O'Neal, D. L.

    1986-01-01T23:59:59.000Z

    ] has been created to encourage the energy efficient design of new buildings. It provides criteria and minimum standards to reduce energy consumption without constraining the building function or the comfort of the occupants. It also provides methods... ENERGY ANALYSIS AND ENERGY CONSERVATION OPTION FOR THE WAREHOUSE FACILITY AT THE HUMAN SERVICES CENTER COMPLEX DRAFT REPORT Submitted by Mohsen Farzad Dennis O'Neal Prepared For Energy Efficiency Division Texas Public Utility Commission Austin...

  4. SETTING-UP AND PAYING UTILITIES SIGNING UP FOR UTILITY SERVICE

    E-Print Network [OSTI]

    Bogaerts, Steven

    SETTING-UP AND PAYING UTILITIES SIGNING UP FOR UTILITY SERVICE When you sign up for utility service, you may be required to pay a deposit. Here are some questions you should ask a utility company should call to report service problems? If you have an issue with a utility company that you can

  5. Using Entrez Utilities Web Service with C# and MS Visual Studio Entrez Utilities Web Service has been tested with

    E-Print Network [OSTI]

    Levin, Judith G.

    Using Entrez Utilities Web Service with C# and MS Visual Studio 2008 Entrez Utilities Web Service Version 9.0.30729.1 SP Creating a Web Service Client Project The following walkthrough describes how to create a new C# project to access the NCBI Entrez Utilities Web Service using MS Visual Studio 2008

  6. Competitive Subcontract Selection in Utility Energy Service Contracts

    Broader source: Energy.gov [DOE]

    Presentation covers subcontract selections in utility energy service contracts and is given at the Spring 2011 Federal Utility Partnership Working Group (FUPWG) meeting.

  7. Utility Energy Service Contracts for Renewable Energy Projects

    Broader source: Energy.gov [DOE]

    Utility energy service contracts (UESCs) offer Federal agencies an effective means to implement energy efficiency, renewable energy, and water efficiency projects. In a UESC, a utility arranges...

  8. Economics of Alaska North Slope gas utilization options

    SciTech Connect (OSTI)

    Thomas, C.P.; Doughty, T.C.; Hackworth, J.H.; North, W.B.; Robertson, E.P.

    1996-08-01T23:59:59.000Z

    The recoverable natural gas available for sale in the developed and known undeveloped fields on the Alaskan North Slope (ANS) total about 26 trillion cubic feet (TCF), including 22 TCF in the Prudhoe Bay Unit (PBU) and 3 TCF in the undeveloped Point Thomson Unit (PTU). No significant commercial use has been made of this large natural gas resource because there are no facilities in place to transport this gas to current markets. To date the economics have not been favorable to support development of a gas transportation system. However, with the declining trend in ANS oil production, interest in development of this huge gas resource is rising, making it important for the U.S. Department of Energy, industry, and the State of Alaska to evaluate and assess the options for development of this vast gas resource. The purpose of this study was to assess whether gas-to-liquids (GTL) conversion technology would be an economic alternative for the development and sale of the large, remote, and currently unmarketable ANS natural gas resource, and to compare the long term economic impact of a GTL conversion option to that of the more frequently discussed natural gas pipeline/liquefied natural gas (LNG) option. The major components of the study are: an assessment of the ANS oil and gas resources; an analysis of conversion and transportation options; a review of natural gas, LNG, and selected oil product markets; and an economic analysis of the LNG and GTL gas sales options based on publicly available input needed for assumptions of the economic variables. Uncertainties in assumptions are evaluated by determining the sensitivity of project economics to changes in baseline economic variables.

  9. Evaluation of Industrial Energy Options for Cogeneration, Waste Heat Recovery and Alternative Fuel Utilization

    E-Print Network [OSTI]

    Hencey, S.; Hinkle, B.; Limaye, D. R.

    1980-01-01T23:59:59.000Z

    This paper describes the energy options available to Missouri industrial firms in the areas of cogeneration, waste heat recovery, and coal and alternative fuel utilization. The project, being performed by Synergic Resources Corporation...

  10. Working With Your Utility to Obtain Metering Services

    Broader source: Energy.gov [DOE]

    Presentation—given at the Spring 2013 Federal Utility Partnership Working Group (FUPWG) meeting—covers the government metering requirement, the U.S. Department of Defense (DoD) metering directive, and customer metering services available from utilities.

  11. Diversifying Project Portfolios for Utility Energy Service Contracts...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    project portfolio enhances utility energy service contracts (UESCs) to ensure Federal agencies get the best value possible. Energy efficiency measures are inherent in UESC...

  12. Spot pricing of public utility services

    E-Print Network [OSTI]

    Bohn, Roger E.

    1982-01-01T23:59:59.000Z

    This thesis analyzes how public utility prices should be changed over time and space. Earlier static and non spatial models of public utility pricing emerge as special cases of the theory developed here. Electricity is ...

  13. DOE Considers Natural Gas Utility Service Options: Proposal Includes

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehiclesTankless orAChiefAppropriation FY 2012Control WorkChief FOIA30-mile

  14. Utility Energy Services Contracting (UESC) Overview

    Broader source: Energy.gov (indexed) [DOE]

    Contracting (UESC) Overview Michael Norton Huntsville Engineering and Support Center U.S. Army Corps of Engineers Federal Utility Partnership Working Group Spring 2012 Jekyll...

  15. Moorhead Public Service Utility- Renewable Energy Incentive

    Broader source: Energy.gov [DOE]

    Moorhead Public Service (MPS) offers rebates for qualifying electricity producing solar or wind renewable energy systems. Wind rebates are not availble to residential customers. Rebates are for up...

  16. Utility Energy Services Contracts: Enabling Documents, May 2009 (Book)

    SciTech Connect (OSTI)

    Not Available

    2009-05-01T23:59:59.000Z

    Enabling Documents, delivered by the U.S. Department of Energy's Federal Energy Management Program (FEMP) to provide materials that clarify the authority for federal agencies to enter into utility energy services contracts (UESCs).

  17. Getting the Best Value with Utility Energy Service Contracts

    Broader source: Energy.gov [DOE]

    Federal agencies benefit from lessons learned during utility energy service contracts (UESCs). Over the years, best practices to get the best value from UESCs have been identified from successful UESC projects.

  18. Intern experience with Texas Utilities Services, Inc.: an internship report

    E-Print Network [OSTI]

    Janne, Randall Lee, 1953-

    2013-03-13T23:59:59.000Z

    This report is a review of the author's year of experience as an intern with Texas Utilities Services...The author worked as a Nuclear Fuels Engineer for the duration of the internship period. His primary assignment was the development...

  19. Ancillary-service costs for 12 US electric utilities

    SciTech Connect (OSTI)

    Kirby, B.; Hirst, E.

    1996-03-01T23:59:59.000Z

    Ancillary services are those functions performed by electrical generating, transmission, system-control, and distribution-system equipment and people to support the basic services of generating capacity, energy supply, and power delivery. The Federal Energy Regulatory Commission defined ancillary services as ``those services necessary to support the transmission of electric power from seller to purchaser given the obligations of control areas and transmitting utilities within those control areas to maintain reliable operations of the interconnected transmission system.`` FERC divided these services into three categories: ``actions taken to effect the transaction (such as scheduling and dispatching services) , services that are necessary to maintain the integrity of the transmission system [and] services needed to correct for the effects associated with undertaking a transaction.`` In March 1995, FERC published a proposed rule to ensure open and comparable access to transmission networks throughout the country. The rule defined six ancillary services and developed pro forma tariffs for these services: scheduling and dispatch, load following, system protection, energy imbalance, loss compensation, and reactive power/voltage control.

  20. Diversifying Project Portfolios for Utility Energy Service Contracts

    Broader source: Energy.gov [DOE]

    Building a diversified project portfolio enhances utility energy service contracts (UESCs) to ensure Federal agencies get the best value possible. Energy efficiency measures are inherent in UESC projects. However, do not overlook the possibility for renewable energy and water efficiency and other conservation measures.

  1. Using Entrez Utilities Web Service with Visual Basic and MS Visual Studio 2008

    E-Print Network [OSTI]

    Levin, Judith G.

    Using Entrez Utilities Web Service with Visual Basic and MS Visual Studio 2008 Entrez Utilities Web to create a Visual Basic project to access the NCBI Entrez Utilities Web Service using MS Visual Studio 2005.wsdl or path to local file (for example, C: \\SOAP\\eUtils\\v2.0\\eutils.wsdl) if you downloaded eUtils WSDL

  2. Using Entrez Utilities Web Service with Apache Axis2 for Java Creating a Web Service Client Application

    E-Print Network [OSTI]

    Levin, Judith G.

    Using Entrez Utilities Web Service with Apache Axis2 for Java Creating a Web Service Client Entrez Utilities Web Service using Axis2 for Java. Preinstalled Software You should have Apache Axis2.sh shell script file on Linux) in the bin directory of Axis2 installation. You will use it to generate Web

  3. Real Time Pricing as a Default or Optional Service for C&ICustomers: A Comparative Analysis of Eight Case Studies

    SciTech Connect (OSTI)

    Barbose, Galen; Goldman, Charles; Bharvirkar, Ranjit; Hopper,Nicole; Ting, Michael; Neenan, Bernie

    2005-08-01T23:59:59.000Z

    Demand response (DR) has been broadly recognized to be an integral component of well-functioning electricity markets, although currently underdeveloped in most regions. Among the various initiatives undertaken to remedy this deficiency, public utility commissions (PUC) and utilities have considered implementing dynamic pricing tariffs, such as real-time pricing (RTP), and other retail pricing mechanisms that communicate an incentive for electricity consumers to reduce their usage during periods of high generation supply costs or system reliability contingencies. Efforts to introduce DR into retail electricity markets confront a range of basic policy issues. First, a fundamental issue in any market context is how to organize the process for developing and implementing DR mechanisms in a manner that facilitates productive participation by affected stakeholder groups. Second, in regions with retail choice, policymakers and stakeholders face the threshold question of whether it is appropriate for utilities to offer a range of dynamic pricing tariffs and DR programs, or just ''plain vanilla'' default service. Although positions on this issue may be based primarily on principle, two empirical questions may have some bearing--namely, what level of price response can be expected through the competitive retail market, and whether establishing RTP as the default service is likely to result in an appreciable level of DR? Third, if utilities are to have a direct role in developing DR, what types of retail pricing mechanisms are most appropriate and likely to have the desired policy impact (e.g., RTP, other dynamic pricing options, DR programs, or some combination)? Given a decision to develop utility RTP tariffs, three basic implementation issues require attention. First, should it be a default or optional tariff, and for which customer classes? Second, what types of tariff design is most appropriate, given prevailing policy objectives, wholesale market structure, ratemaking practices and standards, and customer preferences? Third, if a primary goal for RTP implementation is to induce DR, what types of supplemental activities are warranted to support customer participation and price response (e.g., interval metering deployment, customer education, and technical assistance)?

  4. Moorhead Public Service Utility- Commercial and Industrial Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    [http://www.mpsutility.com Moorhead Public Service Utility] offers the Bright Energy Solutions Programs for commercial and industrial customers that purchase and install qualifying energy-efficient...

  5. Benchmarking and incentive regulation of quality of service: an application to the UK electricity distribution utilities

    E-Print Network [OSTI]

    Giannakis, D; Jamasb, Tooraj; Pollitt, Michael G.

    2004-06-16T23:59:59.000Z

    Cambridge Working Papers in Economics CWPE 0408 Benchmarking and Incentive Regulation of Quality of Service: an Application to the UK Electricity Distribution Utilities D. Giannakis, T. Jamasb, and M. Pollitt... and Environmental Policy Research CMI Working Paper Series UNIVERSITY OF CAMBRIDGE Department of Applied Economics BENCHMARKING AND INCENTIVE REGULATION OF QUALITY OF SERVICE: AN APPLICATION TO THE UK ELECTRICITY DISTRIBUTION UTILITIES Dimitrios Giannakis...

  6. Impact of Separation on Community Social Service Utilization

    E-Print Network [OSTI]

    McDonald, Thomas P.; Piliavin, Irving

    1981-01-01T23:59:59.000Z

    This experiment indicates that AFDC recipients who received public welfare social services under the format of separation of services from financial aid are more likely than recipients in the combined condition to use ...

  7. Provision of utility support services to the US Department of Energy San Francisco Operations Office. Final technical report

    SciTech Connect (OSTI)

    Not Available

    1994-04-01T23:59:59.000Z

    The main purpose of this project was to provide to DOE/SAN continuing, follow-up support to realize savings from a number of alternate supply arrangements that had already been and/or were expected to be identified under the original project. This expected continuation of these efforts is demonstrated by certain of the tasks that are spelled out in the Statement of Work. For example: Evaluate and propose alternative options and methods for improving efficiency, reducing cost, and making effective use of the energy supplies and facilities under various conditions of use; Provide engineering and economic analysis and recommendations for utility-related facilities and service issues, such as high voltage discounts, ownership of facilities, etc.; Assist in developing strategy and documentation in support of negotiating utility contracts and modifications thereto. In addition, the follow-on contract provided for monitoring and intervening in rate cases that had particular relevance to the DOE/SAN laboratories.

  8. Electric retail market options: The customer perspective

    SciTech Connect (OSTI)

    Hadley, S.W.; Hillsman, E.L.

    1995-07-01T23:59:59.000Z

    This report describes various options that are now available for retail electric customers, or that may become available during the next few years as the electric utility industry restructures. These options include different ways of meeting demand for energy services, different providers of service or points of contact with providers, and different pricing structures for purchased services. Purpose of this document is to examine these options from the customer`s perspective: how might being a retail electric customer in 5--10 years differ from now? Seizing opportunities to reduce cost of electric service is likely to entail working with different service providers; thus, transaction costs are involved. Some of the options considered are speculative. Some transitional options include relocation, customer-built/operated transmission lines, municipalization, self-generation, and long-term contracts with suppliers. All these may change or diminish in a restructured industry. Brokers seem likely to become more common unless restructuring takes the form of mandatory poolcos (wholesale). Some options appear robust, ie, they are likely to become more common regardless of how restructuring is accomplished: increased competition among energy carriers (gas vs electric), real-time pricing, etc. This report identified some of the qualitative differences among the various options. For customers using large amounts of electricity, different alternatives are likely to affect greatly service price, transaction costs, tailoring service to customer preferences, and risks for customer. For retail customers using small amounts of electricity, there may be little difference among the options except service price.

  9. UCSC EMPLOYEE HOUSING APARTMENTS APPLICATION Rental rates include: rent, refuse collection, common area utilities, groundskeeping services, and repairs and

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    area utilities, groundskeeping services, and repairs and maintenance of the Laureate Court complex. Tenants pay for their own utilities (i.e., electricity, gas, water, telephone and cable services). A $750

  10. Adapting state and national electricity consumption forecasting methods to utility service areas. Final report

    SciTech Connect (OSTI)

    Swift, M.A.

    1984-07-01T23:59:59.000Z

    This report summarizes the experiences of six utilities (Florida Power and Light Co., Municipal Electric Authority of Georgia, Philadelphia Electric Co., Public Service Co. of Colorado, Sacramento Municipal Utility District, and TVA) in adapting to their service territories models that were developed for forecasting loads on a national or regional basis. The models examined were of both end-use and econometric design and included the three major customer classes: residential, commercial, and industrial.

  11. Service and Utility Oriented Distributed Computing Systems: Challenges and Opportunities for Modeling and Simulation Communities

    E-Print Network [OSTI]

    Buyya, Rajkumar

    1 Service and Utility Oriented Distributed Computing Systems: Challenges and Opportunities) networks have emerged as popular platforms for the next generation parallel and distributed computing. Utility computing is envisioned to be the next generation of IT evolution that depicts how computing needs

  12. User fees, health staff incentives, and service utilization in Kabarole District, Uganda

    E-Print Network [OSTI]

    Scharfstein, Daniel

    User fees, health staff incentives, and service utilization in Kabarole District, Uganda Walter in Kabarole District, western Uganda. Methods Of the 38 government health units that had introduced user incentive plans; Cost sharing; Community health centers/utilization; Health; Health care surveys; Uganda

  13. Energy Efficiency: Marketing and Service Potential for Energy Utilities' Industrial Markets

    E-Print Network [OSTI]

    Russel, C.; Tate, R.; Tubiolo, A.

    to serve a specific customer segment. Example companies: ? Kansas Gas Service (Kansas City & Wichita, KS) ? Public Service Gas &Electric (Newark, NJ) ? NW Natural (Portland, OR) ? Reliant Minnegasco (Minneapolis, MN) ? Oklahoma Natural Gas (Okla... information or links to other sites that do. A collaboration of New England based utilities have developed the GasNetworks website for both marketing and customer service purposes. Other examples: ? NW Natural (Portland, OR); ? Piedmont Natural Gas...

  14. Property:Utility Services Available | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: EnergyPotentialUrbanUtilityScalePVCapacity Jump to:USGSMeanReservoirTemp Jump to: navigation, searchAvailable

  15. Utility Energy Service Contract Contacts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment of Dept. ofUSA RSDepartmentProject Funding » Utility Energy

  16. Utility Energy Service Contract Partnership Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment of Dept. ofUSA RSDepartmentProject Funding » Utility EnergyProject

  17. The Utilities' Role in Conservation and Cogeneration

    E-Print Network [OSTI]

    Mitchell, R. C., III

    1982-01-01T23:59:59.000Z

    The electric utility industry is uniquely qualified and positioned to serve as an effective 'deliverer' of energy conservation services and alternative energy supply options, such as cogeneration, rather than merely as a 'facilitator...

  18. Fair Labor Standards Act and Service Contract Act-Price Adjustment UT-B Contracts Div (Multiple Year and Option Contracts)

    E-Print Network [OSTI]

    Pennycook, Steve

    Fair Labor Standards Act and Service Contract Act-Price Adjustment UT-B Contracts Div (Multiple STANDARDS ACT AND SERVICE CONTRACT ACT - PRICE ADJUSTMENT (MULTIPLE YEAR AND OPTION CONTRACTS) (Sept 2009 is provided under this clause. (c) The wage determination, issued under the Service Contract Act of 1965

  19. Coal contracting: Lessons utilities are learning from the pricing of their services

    SciTech Connect (OSTI)

    Lively, M.B.

    1996-12-31T23:59:59.000Z

    The lessons that electric and gas utilities are learning from the pricing of their services are discussed. The utilities will have accountants look at their operations, determine quantities and costs, and set prices so that the quantities sold will produce revenue equal to costs, or even greater than costs so the company can make a profit. The demand side of the business and the diversification going on in the industry are described.

  20. Updated Analysis of Energy and cost Savings for Utility service Program at Federal Sites

    SciTech Connect (OSTI)

    Mcmordie, Katherine; Sandusky, William F.; Solana, Amy E.; Bates, Derrick J.

    2006-10-31T23:59:59.000Z

    Report detailing PNNL's re-analysis of data based original analysis done in 2004. The data came from the updated Department of Energy Federal Energy Management utility energy services contract database and the analysis was also expanded to uncover information on additional areas.

  1. Utilizing Green Energy Prediction to Schedule Mixed Batch and Service Jobs in Data Centers

    E-Print Network [OSTI]

    Simunic, Tajana

    Utilizing Green Energy Prediction to Schedule Mixed Batch and Service Jobs in Data Centers Baris on using immediately available green energy to supplement the non- renewable, or brown energy at the cost of canceling and rescheduling jobs whenever the green energy availability is too low [16]. In this paper we

  2. Management support services to the Office of Utility Technologies. Final technical report

    SciTech Connect (OSTI)

    Not Available

    1993-12-16T23:59:59.000Z

    The Office of Utility Technologies works cooperatively with industry and the utility sector to realize the market potential for energy efficiency and renewable energy technologies. Under this contract, BNF has provided management support services for OUT R&D activities for the following Program offices: (1) Office of Energy Management; (2) Office of Solar Energy Conversion; (3) Office of Renewable Energy Conversion; and (4) Deputy Assistant Secretary. During the period between 4/17/91 and 9/17/93, BNF furnished the necessary personnel, equipment, materials, facilities and travel required to provide management support services for each of the above Program Offices. From 9/18/93 to 12/17/93, BNF has been involved in closeout activities, including final product deliverables. Research efforts that have been supported in these Program Offices are: (1) for Energy Management -- Advanced Utility Concepts Division; Utility Systems Division; Integrated Planning; (2) for Solar Energy Conversion -- Photovoltaics Division; Solar Thermal and Biomass Power Division; (3) for Renewable Energy Conversion -- Geothermal Division; Wind, Hydroelectric and Ocean Systems Division; (4) for the Deputy Assistant Secretary -- support as required by the Supporting Staff. This final report contains summaries of the work accomplished for each of the Program Offices listed above.

  3. Employee SelfService (ESS) Time Entry Eligible employees may utilize the Employee SelfService application in myOleMiss to submit their attendances

    E-Print Network [OSTI]

    Tchumper, Gregory S.

    1 Employee SelfService (ESS) Time Entry Eligible employees may utilize the Employee Self them that time has been submitted for their approval. If you need assistance with ESS Time Entry

  4. Employee SelfService (ESS) Time Approval Supervisors may utilize the Employee SelfService application in myOleMiss to approve employees' attendances

    E-Print Network [OSTI]

    Tchumper, Gregory S.

    1 Employee SelfService (ESS) Time Approval Supervisors may utilize the Employee Self/rejection. If you need assistance with ESS Time Approval, please contact the Payroll Office in Human Resources

  5. A Comparison of Domestic Water Heating Options in the Austin Electric Service Area

    E-Print Network [OSTI]

    Vliet, G. C.; Hood, D. B.

    1985-01-01T23:59:59.000Z

    controlled and actual opera tinp, situations. The larye DOE/ORNL/EUS field test of HPVHs was probably the most co~nprehensive (3). The Florida Public Service Colmi~ission sporlsored saveral field tests of all four water heating systems to evaluate.... Thesis, The University of Texas at ----- Austin, Dec.. 1982. 2. Askey, Jay L., The Effect of Residential 3. R. P. Blevins, B. D. Sloan, and G. E. Malli. "Demonstration of a Heat Pump Water Heater, Volume 2: Final Report." ORNL/Sub-7321-4, Oak Ridge...

  6. Public Service Commission Authorization to Utilize an Alternative Method of Cost Recovery for Certain Base Load Generation (Mississippi)

    Broader source: Energy.gov [DOE]

    The Senate Bill 2793 authorizes the Public Service Commission (PSC) to utilize an alternative cost recovery for certain base load generation. The PSC is authorized to include in an electric...

  7. Hypermodular Self-Assembling Space Solar Power -- Design Option for Mid-Term GEO Utility-Scale Power Plants

    E-Print Network [OSTI]

    Leitgab, Martin

    2013-01-01T23:59:59.000Z

    This paper presents a design for scaleable space solar power systems based on free-flying reflectors and module self-assembly. Lower system cost of utility-scale space solar power is achieved by design independence of yet-to-be-built in-space assembly or transportation infrastructure. Using current and expected near-term technology, this study describe a design for mid-term utility-scale power plants in geosynchronous orbits. High-level economic considerations in the context of current and expected future launch costs are given as well.

  8. Pawnee Nation Energy Option Analyses

    SciTech Connect (OSTI)

    Matlock, M.; Kersey, K.; Riding In, C.

    2009-07-31T23:59:59.000Z

    In 2003, the Pawnee Nation leadership identified the need for the tribe to comprehensively address its energy issues. During a strategic energy planning workshop a general framework was laid out and the Pawnee Nation Energy Task Force was created to work toward further development of the tribe’s energy vision. The overarching goals of the “first steps” project were to identify the most appropriate focus for its strategic energy initiatives going forward, and to provide information necessary to take the next steps in pursuit of the “best fit” energy options. Based on the request of Pawnee Nation’s Energy Task Force the research team, consisting Tribal personnel and Summit Blue Consulting, focused on a review of renewable energy resource development potential, funding sources and utility organizational along with energy savings options. Elements of the energy demand forecasting and characterization and demand side options review remained in the scope of work, but were only addressed at a high level. Description of Activities Performed Renewable Energy Resource Development Potential The research team reviewed existing data pertaining to the availability of biomass (focusing on woody biomass, agricultural biomass/bio-energy crops, and methane capture), solar, wind and hydropower resources on the Pawnee-owned lands. Using these data, combined with assumptions about costs and revenue streams, the research team performed preliminary feasibility assessments for each resource category. The research team also reviewed available funding resources and made recommendations to Pawnee Nation highlighting those resources with the greatest potential for financially-viable development, both in the near-term and over a longer time horizon. Energy Efficiency Options While this was not a major focus of the project, the research team highlighted common strategies for reducing energy use in buildings. The team also discussed the benefits of adopting a building energy code and introduced two model energy codes Pawnee Nation should consider for adoption. Summary of Current and Expected Future Electricity Usage The research team provided a summary overview of electricity usage patterns in current buildings and included discussion of known plans for new construction. Utility Options Review Pawnee Nation electric utility options were analyzed through a four-phase process, which included: 1) summarizing the relevant utility background information; 2) gathering relevant utility assessment data; 3) developing a set of realistic Pawnee electric utility service options, and 4) analyzing the various Pawnee electric utility service options for the Pawnee Energy Team’s consideration. III. Findings and Recommendations Due to a lack of financial incentives for renewable energy, particularly at the state level, combined mediocre renewable energy resources, renewable energy development opportunities are limited for Pawnee Nation. However, near-term potential exists for development of solar hot water at the gym, and an exterior wood-fired boiler system at the tribe’s main administrative building. Pawnee Nation should also explore options for developing LFGTE resources in collaboration with the City of Pawnee. Significant potential may also exist for development of bio-energy resources within the next decade. Pawnee Nation representatives should closely monitor market developments in the bio-energy industry, establish contacts with research institutions with which the tribe could potentially partner in grant-funded research initiatives. In addition, a substantial effort by the Kaw and Cherokee tribes is underway to pursue wind development at the Chilocco School Site in northern Oklahoma where Pawnee is a joint landowner. Pawnee Nation representatives should become actively involved in these development discussions and should explore the potential for joint investment in wind development at the Chilocco site.

  9. Market-Oriented Cloud Computing: Vision, Hype, and Reality for Delivering IT Services as Computing Utilities

    E-Print Network [OSTI]

    Buyya, Rajkumar; Venugopal, Srikumar

    2008-01-01T23:59:59.000Z

    This keynote paper: presents a 21st century vision of computing; identifies various computing paradigms promising to deliver the vision of computing utilities; defines Cloud computing and provides the architecture for creating market-oriented Clouds by leveraging technologies such as VMs; provides thoughts on market-based resource management strategies that encompass both customer-driven service management and computational risk management to sustain SLA-oriented resource allocation; presents some representative Cloud platforms especially those developed in industries along with our current work towards realising market-oriented resource allocation of Clouds by leveraging the 3rd generation Aneka enterprise Grid technology; reveals our early thoughts on interconnecting Clouds for dynamically creating an atmospheric computing environment along with pointers to future community research; and concludes with the need for convergence of competing IT paradigms for delivering our 21st century vision.

  10. Real Time Pricing as a Default or Optional Service for C&I Customers: A Comparative Analysis of Eight Case Studies

    E-Print Network [OSTI]

    Barbose, Galen; Goldman, Charles; Bharvirkar, Ranjit; Hopper, Nicole; Ting, Michael; Neenan, Bernie

    2005-01-01T23:59:59.000Z

    Load Response Program – Real Time Option is a unique examplePJM Economic LRP – Real Time Option, PJM Emergency LRPPJM Economic LRP – Real Time Option PowerShare – QuoteOption

  11. Opportunities for utility involvement with solar domestic hot water

    SciTech Connect (OSTI)

    Carlisle, N.; Christensen, C. (National Renewable Energy Lab., Golden, CO (United States)); Barrett, L. (Barrett Consulting Associates, Inc., Colorado Springs, CO (United States))

    1992-05-01T23:59:59.000Z

    Solar water heating is one of a number of options that can be considered under utility demand-side management (DSM) programs. Utilities perceive a range of potential benefits for solar water heating in terms of customer service, energy conservation, load management, environmental enhancement, and public relations. The solar industry may benefit from utility marketing efforts, economies of scale, added credibility, financing options, and long-term maintenance arrangements. This paper covers three topics: (1) the energy and demand impacts of solar water heating on utility load profiles based on the results of four studies in the literature, (2) the results of workshops sponsored by the National Renewable Energy Laboratory (NREL) to identify key issues faced by utilities in considering residential solar water heating as a DSM option, (3) several current or planned utility programs to promote solar water heating. 7 refs.

  12. Decoupling Policies: Options to Encourage Energy Efficiency Policies for Utilities; Clean Energy Policies in States and Communities, National Renewable Energy Laboratory (NREL) (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2009-12-01T23:59:59.000Z

    This document discusses the policy of decoupling in utilities and how it can be used to encourage energy efficiency.

  13. Performance Monitoring of Service-Level Agreements for Utility Computing Using the Event Calculus

    E-Print Network [OSTI]

    Sergot, Marek

    ­ and informing interested parties of past, present and (possible) future contract states; and, (ii) Assessing (contract tracking XML). The semantics for CTXML are presented in terms of a computational model based-house and to customers). It will allow them to out-source large areas of their IT service provision to UC-data centres

  14. Energy Analysis and Energy Conservation Options for the Supreme Court and Attorney General Buildings Final Report, Prepared for the Energy Efficiency Division, Texas Public Utility Commission

    E-Print Network [OSTI]

    Farzad, M.; O'Neal, D. L.

    1986-01-01T23:59:59.000Z

    loads, is solar film on the windows. Both the proposed ASHRAE standards and the California standards appear to reduce energy use. The following Table shows EUIs for the Supreme Court and Attorney General buildings with different options. EUI...'s For The Supreme Court and Attorney General Buildings (KBtu/sf-yr) ABSTRACT The energy use and peak load requirement of the Supreme Court & Attorney General Buildings in Austin, Texas were analyzed using the DOE 2.IB building energy simulation program. An analysis...

  15. Hualapai Tribal Utility Development Project

    SciTech Connect (OSTI)

    Hualapai Tribal Nation

    2008-05-25T23:59:59.000Z

    The first phase of the Hualapai Tribal Utility Development Project (Project) studied the feasibility of establishing a tribally operated utility to provide electric service to tribal customers at Grand Canyon West (see objective 1 below). The project was successful in completing the analysis of the energy production from the solar power systems at Grand Canyon West and developing a financial model, based on rates to be charged to Grand Canyon West customers connected to the solar systems, that would provide sufficient revenue for a Tribal Utility Authority to operate and maintain those systems. The objective to establish a central power grid over which the TUA would have authority and responsibility had to be modified because the construction schedule of GCW facilities, specifically the new air terminal, did not match up with the construction schedule for the solar power system. Therefore, two distributed systems were constructed instead of one central system with a high voltage distribution network. The Hualapai Tribal Council has not taken the action necessary to establish the Tribal Utility Authority that could be responsible for the electric service at GCW. The creation of a Tribal Utility Authority (TUA) was the subject of the second objective of the project. The second phase of the project examined the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation and the feasibility of including wind energy from a tribal wind generator in the energy resource portfolio of the tribal utility (see objective 2 below). It is currently unknown when the Tribal Council will consider the implementation of the results of the study. Objective 1 - Develop the basic organizational structure and operational strategy for a tribally controlled utility to operate at the Tribe’s tourism enterprise district, Grand Canyon West. Coordinate the development of the Tribal Utility structure with the development of the Grand Canyon West Power Project construction of the power infrastructure at Grand Canyon West. Develop the maintenance and operations capacity necessary to support utility operations. Develop rates for customers on the Grand Canyon West “mini-grid” sufficient for the tribal utility to be self-sustaining. Establish an implementation strategy for tribal utility service at Grand Canyon West Objective 2 - Develop a strategy for tribal utility takeover of electric service on the Reservation. Perform a cost analysis of Reservation electrical service. Develop an implementation strategy for tribal takeover of Reservation electrical service. Examine options and costs associated with integration of the Tribe’s wind resources.

  16. Lighting Options for Homes.

    SciTech Connect (OSTI)

    Baker, W.S.

    1991-04-01T23:59:59.000Z

    This report covers many aspects of various lighting options for homes. Types of light sources described include natural light, artificial light, incandescent lamps, fluorescent lamps, and high intensity discharge lamps. A light source selection guide gives the physical characteristics of these, design considerations, and common applications. Color, strategies for efficient lighting, and types of lighting are discussed. There is one section giving tips for various situations in specific rooms. Rooms and types of fixtures are shown on a matrix with watts saved by using the recommended type lighting for that room and room location. A major emphasis of this report is saving energy by utilizing the most suitable, recommended lighting option. (BN)

  17. COMM-OPINION-ORDER, 75 FERC 61,208, Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and

    E-Print Network [OSTI]

    Laughlin, Robert B.

    COMM-OPINION-ORDER, 75 FERC ¶61,208, Promoting Wholesale Competition Through Open Access Non Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities-7-001 [61,687] [¶61,208] Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission

  18. Financing Options

    Broader source: Energy.gov [DOE]

    A growing variety of options are available for financing an LED street lighting replacement program. One or another approach may be preferable based on the system ownership and maintenance model in...

  19. What's the Option?

    E-Print Network [OSTI]

    Traeger, Christian

    2013-01-01T23:59:59.000Z

    option value. Second, the real options literature developed1994) spread the work on real options analysis to a broadis known as the real options approach. Translated into our

  20. DSM Program Development. The demand-side resource options were developed using a combination of internal engineering estimates and external consulting services. The

    E-Print Network [OSTI]

    for the determination of the optimum program level to be included in the IRP. The demand-side management options wereDSM Program Development. The demand-side resource options were developed using a combination Practices Manual: Economic Analysis of Demand-side Programs and Projects.2 The proposed DSM programs

  1. Services

    Broader source: Energy.gov [DOE]

    The Office of Management provides many of the services that keep the Department of Energy Headquarters offices operational.  Other Program Offices also provide services to the employees at...

  2. A new option in ECE @ UBC The Biomedical Engineering (BE) option offers

    E-Print Network [OSTI]

    Pulfrey, David L.

    A new option in ECE @ UBC The Biomedical Engineering (BE) option offers the opportunity to gain core competency in fundamental electrical engineering topics, key topics in biomedical engineering on the Biomedical Engineering option: Student Services Electrical & Computer Engineering The University of British

  3. Comment amliorer le financement et la durabilit des services publics... http://cemadoc.irstea.fr/exl-php/util/documents/accede_document.php 15 sur 20 18/02/2014 11:24

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Comment améliorer le financement et la durabilité des services publics... http://cemadoc.irstea.fr/exl-php/util/documents/accede_document.php... http://cemadoc.irstea.fr/exl-php/util/documents/accede_document.php 16 sur 20 18/02/2014 11:24 #12;Comment améliorer le financement et la durabilité des services publics... http://cemadoc.irstea.fr/exl-php/util/documents/accede_document.php

  4. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    Presentationand Publicationat the CBIP International Conference onFly Ash Disposal & Utilization,New Delhi, India, January 1998 foundry sand and slag. Most of these by-products are landfilled, primarily due to non-availability of economically attractive use options. Landfilling is not a desirable option because it not only causes huge

  5. Federal Utility Partnership Working Group Participants | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in the Federal Utility Partnership Working Group or engaged in a utility energy service contract project. General Services Administration National Aeronautics and Space...

  6. PFBC Utility Demonstration Project

    SciTech Connect (OSTI)

    Not Available

    1992-11-01T23:59:59.000Z

    This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP's proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

  7. Integrating Solar PV into Energy Services Performance Contracts...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrating Solar PV into Energy Services Performance Contracts: Options for Local Governments Nationwide Integrating Solar PV into Energy Services Performance Contracts: Options...

  8. GSA-Utility Interconnection Agreements

    Broader source: Energy.gov [DOE]

    Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—covers the General Service Administration's (GSA's) utility interconnection agreements.

  9. Forecourt Storage and Compression Options

    E-Print Network [OSTI]

    capital costs and maximize utilization NATURAL GAS & HYDROGEN FUELING STATION SIZING SOFTWARE Developed 510 520 530 540 Minutes Bank1 Bank2 Bank3 Cascade Banks Pressure Vs.Time (Hydrogen) #12;16 Compressor> Forecourt Storage and Compression Options DOE and FreedomCAR & Fuel Partnership Hydrogen Delivery

  10. Utility -Owned Central Plant Load Management at the Domain

    E-Print Network [OSTI]

    Lilley, D.

    2013-01-01T23:59:59.000Z

    intensive than ice > Pro – Can use existing chillers > Pro – Can be below ground (dual use of space) > Pro – Can be used for fire fighting or cooling tower backup water source > Con – Larger footprint 7 Thermal Energy Storage (TES) Options ESL-KT-13...Dennis Lilley, CEM, PMP Customer Energy Solutions, Austin Energy Mission: Deliver clean, affordable, reliable energy and excellent customer service. Utility Owned Load Management – Thermal Energy Storage ESL-KT-13-12-12 CATEE 2013: Clean Air...

  11. Services

    Broader source: Energy.gov [DOE]

    The Human Capital Office offers benefit, new employee orientation and some learning & development related services to all DOE employees. Additionally the Office supplies employee and labor...

  12. BPA_Utilities_and_Cities.mxd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    cTribalandIOUCustomerServiceAreas.mxd State Boundary Indian Reservations Public Utilities Tribal Utilities Tribal Investor Owned Utilities Idaho Power Company Northwestern...

  13. Decoupling Policies: Options to Encourage Energy Efficiency Policies...

    Broader source: Energy.gov (indexed) [DOE]

    Decoupling Policies: Options to Encourage Energy Efficiency Policies for Utilities, Clean Energy Policies in States and Communities, National Renewable Energy Laboratory (NREL)...

  14. Introduction to Options

    E-Print Network [OSTI]

    Mintert, James R.; Welch, Mark

    2009-01-07T23:59:59.000Z

    Options give the agricultural industry a flexible pricing tool to assist in price risk managment. This publication defines an option and gives a brief introduction to this tool....

  15. Trends in Utility Green Pricing Programs (2004)

    SciTech Connect (OSTI)

    Bird, L.; Brown, E.

    2005-10-01T23:59:59.000Z

    In the early 1990s, only a handful of utilities offered their customers a choice of purchasing electricity generated from renewable energy sources. Today, nearly 600 utilities in regulated electricity markets--or almost 20% of all utilities nationally--provide their customers a "green power" option. Because some utilities offer programs in conjunction with cooperative associations or other publicly owned power entities, the number of distinct programs totals about 125. Through these programs, more than 40 million customers spanning 34 states have the ability to purchase renewable energy to meet some portion or all of their electricity needs--or make contributions to support the development of renewable energy resources. Typically, customers pay a premium above standard electricity rates for this service. This report presents year-end 2004 data on utility green pricing programs, and examines trends in consumer response and program implementation over time. The data in this report, which were obtained via a questionnaire distributed to utility green pricing program managers, can be used by utilities as benchmarks by which to gauge the success of their green power programs.

  16. Retrieval options study

    SciTech Connect (OSTI)

    Not Available

    1980-03-01T23:59:59.000Z

    This Retrieval Options Study is part of the systems analysis activities of the Office of Nuclear Waste Isolation to develop the scientific and technological bases for radioactive waste repositories in various geologic media. The study considers two waste forms, high level waste and spent fuel, and defines various classes of waste retrieval and recovery. A methodology and data base are developed which allow the relative evaluation of retrieval and recovery costs and the following technical criteria: safety; technical feasibility; ease of retrieval; probable intact retrieval time; safeguards; monitoring; criticality; and licensability. A total of 505 repository options are defined and the cost and technical criteria evaluated utilizing a combination of facts and engineering judgments. The repositories evaluated are selected combinations of the following parameters: Geologic Media (salt, granite, basalt, shale); Retrieval Time after Emplacement (5 and 25 years); Emplacement Design (nominal hole, large hole, carbon steel canister, corrosion resistant canister, backfill in hole, nominal sleeves, thick wall sleeves); Emplacement Configuration (single vertical, multiple vertical, single horizontal, multiple horizontal, vaults; Thermal Considerations; (normal design, reduced density, once-through ventilation, recirculated ventilation); Room Backfill; (none, run-of-mine, early, 5 year delay, 25 year delay, decommissioned); and Rate of Retrieval; (same as emplacement, variably slower depending on repository/canister condition).

  17. Techno-Economic Analysis of BEV Service Providers Offering Battery Swapping Services

    SciTech Connect (OSTI)

    Neubauer, J. S.; Pesaran, A.

    2013-01-01T23:59:59.000Z

    Battery electric vehicles (BEVs) offer the potential to reduce both oil imports and greenhouse gas emissions, but high upfront costs, battery-limited vehicle range, and concern over high battery replacement costs may discourage potential buyers. A subscription model in which a service provider owns the battery and supplies access to battery swapping infrastructure could reduce upfront and replacement costs for batteries with a predictable monthly fee, while expanding BEV range. Assessing the costs and benefits of such a proposal are complicated by many factors, including customer drive patterns, the amount of required infrastructure, battery life, etc. The National Renewable Energy Laboratory has applied its Battery Ownership Model to compare the economics and utility of BEV battery swapping service plan options to more traditional direct ownership options. Our evaluation process followed four steps: (1) identifying drive patterns best suited to battery swapping service plans, (2) modeling service usage statistics for the selected drive patterns, (3) calculating the cost-of-service plan options, and (4) evaluating the economics of individual drivers under realistically priced service plans. A service plan option can be more cost-effective than direct ownership for drivers who wish to operate a BEV as their primary vehicle where alternative options for travel beyond the single-charge range are expensive, and a full-coverage-yet-cost-effective regional infrastructure network can be deployed. However, when assumed cost of gasoline, tax structure, and absence of purchase incentives are factored in, our calculations show the service plan BEV is rarely more cost-effective than direct ownership of a conventional vehicle.

  18. Techno-Economic Analysis of BEV Service Providers Offering Battery Swapping Services: Preprint

    SciTech Connect (OSTI)

    Neubauer, J.; Pesaran, A.

    2013-03-01T23:59:59.000Z

    Battery electric vehicles (BEVs) offer the potential to reduce both oil imports and greenhouse gas emissions, but high upfront costs, battery-limited vehicle range, and concern over high battery replacement costs may discourage potential buyers. A subscription model in which a service provider owns the battery and supplies access to battery swapping infrastructure could reduce upfront and replacement costs for batteries with a predictable monthly fee, while expanding BEV range. Assessing the costs and benefits of such a proposal are complicated by many factors, including customer drive patterns, the amount of required infrastructure, battery life, etc. The National Renewable Energy Laboratory has applied its Battery Ownership Model to compare the economics and utility of BEV battery swapping service plan options to more traditional direct ownership options. Our evaluation process followed four steps: (1) identifying drive patterns best suited to battery swapping service plans, (2) modeling service usage statistics for the selected drive patterns, (3) calculating the cost-of-service plan options, and (4) evaluating the economics of individual drivers under realistically priced service plans. A service plan option can be more cost-effective than direct ownership for drivers who wish to operate a BEV as their primary vehicle where alternative options for travel beyond the single-charge range are expensive, and a full-coverage-yet-cost-effective regional infrastructure network can be deployed. However, when assumed cost of gasoline, tax structure, and absence of purchase incentives are factored in, our calculations show the service plan BEV is rarely more cost-effective than direct ownership of a conventional vehicle.

  19. Proceeding of the Hawaii International System Science Conference, January 1999 Combining Financial Double Call Options with Real Options for Early Curtailment of

    E-Print Network [OSTI]

    Oren, Shmuel S.

    Double Call Options with Real Options for Early Curtailment of Electricity Service Shmuel S. Oren that provides a hedge against price risk and reflects the "real options" available to the customer. This paper flexibility by responding to the price signal and exercise its "real option" to reduce consumption when

  20. Who Owns Renewable Energy Certificates? An Exploration of Policy Options and Practice

    E-Print Network [OSTI]

    Holt, Edward A.; Wiser, Ryan; Bolinger, Mark

    2006-01-01T23:59:59.000Z

    and Public Service Company of New Hampshire); Pacific GasPublic Utilities Commission; New Hampshire Public Utilities Commission; New York State Public Service

  1. Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest RegionatSearchScheduled System OutagesNewsMaterialsX-ray laserServices

  2. Distributed utility technology cost, performance, and environmental characteristics

    SciTech Connect (OSTI)

    Wan, Y.; Adelman, S.

    1995-06-01T23:59:59.000Z

    Distributed Utility (DU) is an emerging concept in which modular generation and storage technologies sited near customer loads in distribution systems and specifically targeted demand-side management programs are used to supplement conventional central station generation plants to meet customer energy service needs. Research has shown that implementation of the DU concept could provide substantial benefits to utilities. This report summarizes the cost, performance, and environmental and siting characteristics of existing and emerging modular generation and storage technologies that are applicable under the DU concept. It is intended to be a practical reference guide for utility planners and engineers seeking information on DU technology options. This work was funded by the Office of Utility Technologies of the US Department of Energy.

  3. Public Utilities Commission Consumer Programs

    E-Print Network [OSTI]

    California Public Utilities Commission Consumer Programs Water Programs The CPUC regulates company's service territory and have varying income limits. Check with your water utility to find out plans that can help you man- age your bills. Contact the utility directly, using the customer service

  4. Utilization of the atmospheric release advisory capability (ARAC) services during and after the Three Mile Island accident

    SciTech Connect (OSTI)

    Knox, J.B.; Dickerson, M.H.; Greenly, G.D.; Gudiksen, P.H.; Sullivan, T.J.

    1980-07-01T23:59:59.000Z

    At 0820 PST on 28 March 1979, the Department of Energy's Emergency Operations Center advised the Atmospheric Release Advisory Capability (ARAC) that the Three Mile Island nuclear power plant in Harrisburg, Pennsylvania, had experienced an accident some four hours earlier, resulting in the atmospheric release of xenon-133 and krypton-88. This report describes ARAC's response to the Three Mile Island accident, including the role ARAC played throughout the 20 days that real-time assessments were made available to the Department of Energy on-scene commander. It also describes the follow-up population-dose calculations performed for the President's Commission on Three Mile Island. At the request of the Nuclear Regulatory Commission, a questionnaire addressing the usefulness of ARAC products during the accident was sent to ARAC-product users. A summary of the findings from this questionnaire, along with recommendations for improving ARAC service, is also presented. The accident at Mississauga, Ontario, Canada, is discussed in the context of a well-planned emergency response by local and Federal officials.

  5. OPTIONS for ENERGY EFFICIENCY

    E-Print Network [OSTI]

    OPTIONS for ENERGY EFFICIENCY in EXISTING BUILDINGS December 2005 CEC-400-2005-039-CMF;OPTIONS FOR ENERGY EFFICIENCY in EXISTING BUILDINGS COMMISSION REPORT TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................iii California's Successful Energy Efficiency Programs

  6. Federal Utility Partnership Working Group Meeting Chairman's...

    Broader source: Energy.gov (indexed) [DOE]

    (FUPWG) meeting-lists key utility program projects and upcoming utility energy service contract (UESC) training. fupwgfall12mcandrew.pdf More Documents & Publications Federal...

  7. Federal Utility Partnership Working Group Participants

    Broader source: Energy.gov [DOE]

    The following Federal agencies have participated in the Federal Utility Partnership Working Group or engaged in a utility energy service contract project.

  8. Electric Utilities and Electric Cooperatives (South Carolina)

    Broader source: Energy.gov [DOE]

    This legislation authorizes the Public Service Commission to promulgate regulations related to investor owned utilities in South Carolina, and addresses service areas, rates and charges, and...

  9. Natural Gas Purchasing Options

    E-Print Network [OSTI]

    Watkins, G.

    As a result of economic and regulatory changes, the natural gas marketplace now offers multiple options for purchasers. The purpose of this panel is to discuss short-term purchasing options and how to take advantage of these options both to lower...

  10. Public Utilities Act (Illinois)

    Broader source: Energy.gov [DOE]

    This act aims to make energy services in the state reliable and efficient, while preserving the quality if the environment. It states the duties of public utilities in terms of accounts and reports...

  11. Cogeneration Assessment Methodology for Utilities

    E-Print Network [OSTI]

    Sedlik, B.

    1983-01-01T23:59:59.000Z

    A methodology is presented that enables electric utilities to assess the cogeneration potential among industrial, commercial, and institutional customers within the utility's service area. The methodology includes a survey design, analytic...

  12. TANK SPACE OPTIONS REPORT

    SciTech Connect (OSTI)

    WILLIS WL; AHRENDT MR

    2009-08-11T23:59:59.000Z

    Since this report was originally issued in 2001, several options proposed for increasing double-shell tank (DST) storage space were implemented or are in the process of implementation. Changes to the single-shell tank (SST) waste retrieval schedule, completion of DST space saving options, and the DST space saving options in progress have delayed the projected shortfall of DST storage space from the 2007-2011 to the 2018-2025 timeframe (ORP-11242, River Protection Project System Plan). This report reevaluates options from Rev. 0 and includes evaluations of new options for alleviating projected restrictions on SST waste retrieval beginning in 2018 because of the lack of DST storage space.

  13. Virginia Tech Services Student Legal Services

    E-Print Network [OSTI]

    Buehrer, R. Michael

    )231-6437 Utility Info:www.vtes.vt.edu A complete list of utility numbers can be found at www(231)2603 www.dining.vt.edu Family Support Info: A list of childcare options in the area can be found at: www)961-1185 Check the website for schedules and maps: www.btransit.org Utilities Local Newspaper Licenses & Decals

  14. COMM-OPINION-ORDER, 76 FERC 61,347, Promoting Wholesale Competition Through Open-Access Non-discriminatory Transmission Services by Public Utilities, Docket No. RM95-8-000, Recovery of Stranded Costs by

    E-Print Network [OSTI]

    Laughlin, Robert B.

    COMM-OPINION-ORDER, 76 FERC ¶61,347, Promoting Wholesale Competition Through Open-Access Non Incorporated Promoting Wholesale Competition Through Open-Access Non-discriminatory Transmission Services Utilities, Docket No. RM94-7-001 [62,646] [¶61,347] Promoting Wholesale Competition Through Open-Access Non

  15. WOOD PRODUCTS AND UTILIZATION

    E-Print Network [OSTI]

    Standiford, Richard B.

    WOOD PRODUCTS AND UTILIZATION V #12;#12;443USDA Forest Service Gen. Tech. Rep. PSW-GTR-160. 1997. Section Overview Wood Products and Utilization1 John R. Shelly2 Forests are obviously a very important asset to California, and their economic and social value to the state is well documented. Wood

  16. Utility Rebates and Incentive Programs (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2009-07-01T23:59:59.000Z

    Fact sheet overview of the Federal Utility Partnership Working Group (FUPWG), including group objectives, activities, and services.

  17. Innovative Utility Partnership at Fort Lewis, Washington

    SciTech Connect (OSTI)

    Not Available

    2000-07-01T23:59:59.000Z

    Utility partnership upgrades energy system to help meet the General Services Administration's (GSA) energy-saving goals

  18. A generalized real options methodology for evaluating investments under uncertainty with application to air transportation

    E-Print Network [OSTI]

    Miller, Bruno, 1974-

    2005-01-01T23:59:59.000Z

    Real options analysis is being increasingly used as a tool to evaluate investments under uncertainty; however, traditional real options methodologies have some shortcomings that limit their utility, such as the use of the ...

  19. Thermal Storage Options for HVAC Systems

    E-Print Network [OSTI]

    Weston, R. F.; Gidwani, B. N.

    THERMAL STORAGE OPTIONS FOR HVAC SYSTEMS B. N. Gidwani, P.E. Roy F. Weston, Inc. West Chester, Pennsylvania ABSTRACT With the ever-increasing cost of electricity and the high demand charges levied by utility compa nies, thermal storage... for cooling is rapidly becom ing a widely recognized method to lower cooling costs. There are three maior types of thermal stor age systems: ? Ice Storage: This utilizes the latent heat of fusion of ice for thermal storage. During off Deak periods...

  20. Survey of state regulatory activities on least cost planning for gas utilities

    SciTech Connect (OSTI)

    Goldman, C.A. (Lawrence Berkeley Lab., CA (United States) National Association of Regulatory Utility Commissioners, Washington, DC (United States)); Hopkins, M.E. (Fleming Group, Washington, DC (United States))

    1991-04-01T23:59:59.000Z

    Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. Incorporating the concept of meeting customer energy service needs entails a recognition that customers' costs must be considered along with the utility's costs in the economic analysis of energy options. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. All state commissions were surveyed to assess the current status of gas planning and demand-side management and to identify significant regulatory issues faced by commissions during the next several years. The survey was to determine the extent to which they have undertaken least-cost planning for gas utilities. The survey included the following topics: (1) status of state PUC least-cost planning regulations and practices for gas utilities; (2) type and scope ofnatural gas DSM programs in effect, includeing fuel substitution; (3) economic tests and analysis methods used to evaluate DSM programs; (4) relationship between prudence reviews of gas utility purchasing practices and integrated resource planning; and (5) key regulatory issues facing gas utilities during the next five years. 34 refs., 6 figs., 10 tabs.

  1. " Federal Utility Energy Service Contracts"

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chiller Central Plant Comprehensive Upgrades ControlsUpgradesRepairs Distributed Generation Renewables HVACMotorsPumps InsulationBuilding Envelope Lighting Lighting and...

  2. Options for Affordable Fission Surface Power Systems

    SciTech Connect (OSTI)

    Houts, Mike; Gaddis, Steve; Porter, Ron; Van Dyke, Melissa; Martin, Jim; Godfroy, Tom; Bragg-Sitton, Shannon; Garber, Anne; Pearson, Boise [NASA Marshall Space Flight Center, VP31, MSFC, AL 35812 (United States)

    2006-07-01T23:59:59.000Z

    Fission surface power systems could provide abundant power anywhere on the surface of the moon or Mars. Locations could include permanently shaded regions on the moon and high latitudes on Mars. To be fully utilized, however, fission surface power systems must be safe, have adequate performance, and be affordable. This paper discusses options for the design and development of such systems. (authors)

  3. EXOTIC OPTIONS FOR INTERRUPTIBLE ELECTRICITY SUPPLY CONTRACTS

    E-Print Network [OSTI]

    the last decade have been directed at increasing competition in the generation of electricity. This hasEXOTIC OPTIONS FOR INTERRUPTIBLE ELECTRICITY SUPPLY CONTRACTS RAJNISH KAMAT and SHMUEL S. OREN of financial contracts for the supply and procurement of interruptible electricity service. While the contract

  4. Parking Options 2011/12 Reserved Permits

    E-Print Network [OSTI]

    Parking Options 2011/12 Reserved Permits A Reserved permit is $275 this fiscal year and is only available to faculty and staff through payroll deduction. Individuals issued a Reserved permit may park is completely full someone is parked illegally and Parking Services should be notified. Reserved permit holders

  5. Generation of Web Service Descriptions and Web Service

    E-Print Network [OSTI]

    Generation of Web Service Descriptions and Web Service Module Implementation for Concept University of Science and Technology Software Systems Institute (STS) #12;Abstract Nowadays web services in order to initiate the communication. A web services endpoint communication interface utilizes

  6. Montana State University Administration and Finance University Services

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    Disposal Engineering & Utilities Engineering Services Utilities Acquisitions Heating Plant OperationMontana State University Administration and Finance University Services Associate Vice President Bob Lashaway Facilities Services Budget & IT Services Budgeting & Accounting IT Services

  7. Montana State University -Administration and Finance University Services

    E-Print Network [OSTI]

    Lawrence, Rick L.

    Disposal Engineering & Utilities Engineering Services Utilities Acquisitions Heating Plant OperationMontana State University - Administration and Finance University Services Associate Vice President Bob Lashaway Facilities Services Budget & IT Services Budgeting & Accounting IT Services

  8. Electricity Real Options Valuation

    E-Print Network [OSTI]

    Ewa Broszkiewicz-Suwaj

    2006-08-16T23:59:59.000Z

    In this paper a real option approach for the valuation of real assets is presented. Two continuous time models used for valuation are described: geometric Brownian motion model and interest rate model. The valuation for electricity spread option under Vasicek interest model is placed and the formulas for parameter estimators are calculated. The theoretical part is confronted with real data from electricity market.

  9. Electricity Real Options Valuation

    E-Print Network [OSTI]

    Broszkiewicz-Suwaj, E

    2006-01-01T23:59:59.000Z

    In this paper a real option approach for the valuation of real assets is presented. Two continuous time models used for valuation are described: geometric Brownian motion model and interest rate model. The valuation for electricity spread option under Vasicek interest model is placed and the formulas for parameter estimators are calculated. The theoretical part is confronted with real data from electricity market.

  10. Techno-economic analysis of renewable energy source options for a district heating project

    SciTech Connect (OSTI)

    Ghafghazi, S. [University of British Columbia, Vancouver; Sowlati, T. [University of British Columbia, Vancouver; Sokhansanj, Shahabaddine [ORNL; Melin, Staffan [University of British Columbia, Vancouver

    2009-09-01T23:59:59.000Z

    With the increased interest in exploiting renewable energy sources for district heating applications, the economic comparison of viable options has been considered as an important step in making a sound decision. In this paper, the economic performance of several energy options for a district heating system in Vancouver, British Columbia, is studied. The considered district heating system includes a 10 MW peaking/ backup natural gas boiler to provide about 40% of the annual energy requirement and a 2.5 MW base-load system. The energy options for the base-load system include: wood pellet, sewer heat, and geothermal heat. Present values of initial and operating costs of each system were calculated over 25-year service life of the systems, considering depreciation and salvage as a negative cost item. It was shown that the wood pellet heat producing technologies provided less expensive energy followed by the sewer heat recovery, geothermal and natural gas systems. Among wood pellet technologies, the grate burner was a less expensive option than powder and gasifier technologies. It was found that using natural gas as a fuel source for the peaking/backup system accounted for more than 40% of the heat production cost for the considered district heating center. This is mainly due to the high natural gas prices which cause high operating costs over the service life of the district heating system. Variations in several economic inputs did not change the ranking of the technology options in the sensitivity analysis. However, it was found that the results were more sensitive to changes in operating costs of the system than changes in initial investment. It is economical to utilize wood pellet boilers to provide the base-load energy requirement of district heating systems Moreover, the current business approach to use natural gas systems for peaking and backup in district heating systems could increase the cost of heat production significantly.

  11. Naval Undersea Warfare Center Division Newport utilities metering, Phase 1

    SciTech Connect (OSTI)

    Carroll, D.M.

    1992-11-01T23:59:59.000Z

    Pacific Northwest Laboratory developed this report for the US Navy's Naval Undersea Warfare Center Division Newport, Rhode Island (NUWC). The purpose of the report was to review options for metering electricity and steam used in the NUWC compound, and to make recommendations to NUWC for implementation under a follow-on project. An additional NUWC concern is a proposed rate change by the servicing utility, Newport Electric, which would make a significant shift from consumption to demand billing, and what effect that rate change would have on the NUWC utility budget. Automated, remote reading meters are available which would allow NUWC to monitor its actual utility consumption and demand for both the entire NUWC compound and by end-use in individual buildings. Technology is available to perform the meter reads and manipulate the data using a personal computer with minimal staff requirement. This is not meant to mislead the reader into assuming that there is no requirement for routine preventive maintenance. All equipment requires routine maintenance to maintain its accuracy. While PNL reviewed the data collected during the site visit, however, it became obvious that significant opportunities exist for reducing the utility costs other than accounting for actual consumption and demand. Unit costs for both steam and electricity are unnecessarily high, and options are presented in this report for reducing them. Additionally, NUWC has an opportunity to undertake a comprehensive energy resource management program to significantly reduce its energy demand, consumption, and costs.

  12. Naval Undersea Warfare Center Division Newport utilities metering, Phase 1

    SciTech Connect (OSTI)

    Carroll, D.M.

    1992-11-01T23:59:59.000Z

    Pacific Northwest Laboratory developed this report for the US Navy`s Naval Undersea Warfare Center Division Newport, Rhode Island (NUWC). The purpose of the report was to review options for metering electricity and steam used in the NUWC compound, and to make recommendations to NUWC for implementation under a follow-on project. An additional NUWC concern is a proposed rate change by the servicing utility, Newport Electric, which would make a significant shift from consumption to demand billing, and what effect that rate change would have on the NUWC utility budget. Automated, remote reading meters are available which would allow NUWC to monitor its actual utility consumption and demand for both the entire NUWC compound and by end-use in individual buildings. Technology is available to perform the meter reads and manipulate the data using a personal computer with minimal staff requirement. This is not meant to mislead the reader into assuming that there is no requirement for routine preventive maintenance. All equipment requires routine maintenance to maintain its accuracy. While PNL reviewed the data collected during the site visit, however, it became obvious that significant opportunities exist for reducing the utility costs other than accounting for actual consumption and demand. Unit costs for both steam and electricity are unnecessarily high, and options are presented in this report for reducing them. Additionally, NUWC has an opportunity to undertake a comprehensive energy resource management program to significantly reduce its energy demand, consumption, and costs.

  13. Federal Utility Partnership Working Group

    Broader source: Energy.gov [DOE]

    The Federal Utility Partnership Working Group (FUPWG) establishes partnerships and facilitates communications among Federal agencies, utilities, and energy service companies. The group develops strategies to implement cost-effective energy efficiency and water conservation projects through utility incentive programs at Federal sites.

  14. Avista Utilities (Electric)- Commercial Energy Efficiency Incentives Program

    Broader source: Energy.gov [DOE]

    Avista Utilities offers numerous incentives to commercial and industrial customers to increase the energy efficiency of customer facilities or equipment. Incentive options are available for heating...

  15. Procurement Options for New Renewable Electricity Supply

    SciTech Connect (OSTI)

    Kreycik, C. E.; Couture, T. D.; Cory, K. S.

    2011-12-01T23:59:59.000Z

    State renewable portfolio standard (RPS) policies require utilities and load-serving entities (LSEs) to procure renewable energy generation. Utility procurement options may be a function of state policy and regulatory preferences, and in some cases, may be dictated by legislative authority. Utilities and LSEs commonly use competitive solicitations or bilateral contracting to procure renewable energy supply to meet RPS mandates. However, policymakers and regulators in several states are beginning to explore the use of alternatives, namely feed-in tariffs (FITs) and auctions to procure renewable energy supply. This report evaluates four procurement strategies (competitive solicitations, bilateral contracting, FITs, and auctions) against four main criteria: (1) pricing; (2) complexity and efficiency of the procurement process; (3) impacts on developers access to markets; and (4) ability to complement utility decision-making processes. These criteria were chosen because they take into account the perspective of each group of stakeholders: ratepayers, regulators, utilities, investors, and developers.

  16. Physics & Astronomy Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    148 Physics & Astronomy Degree options BSc (Single Honours Degrees) Astrophysics Physics MPhys (Single Honours Degrees) Astrophysics Physics Theoretical Physics BSc (Joint Honours Degrees) Physics) Theoretical Physics and Mathematics MSci (Joint Honours Degree) Physics and Chemistry Entrance Requirements

  17. Mathematics & Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    132 Mathematics & Statistics Degree options MMath (Single Honours Degrees) Mathematics Applied Mathematics Pure Mathematics Statistics BSc or MA (Single Honours Degrees) Mathematics Statistics [If you wish (Joint Honours Degrees) Mathematics and one of: Biology Chemistry Computer Science Economics Geography

  18. Cogeneration System Design Options

    E-Print Network [OSTI]

    Gilbert, J. S.

    , engine, turbine, generator, switchgear, and balance of plant can be bewildering. This paper presents an overview and a systematic approach to the basic system alternatives and attributes. The presentation illustrates how these options match the electrical...

  19. Assessing Renewable Energy Options

    Broader source: Energy.gov [DOE]

    Federal agencies should assess renewable energy options for each specific project when integrating renewable energy in new building construction or major renovations. This section covers the preliminary screening, screening, feasibility study, and sizing and designing systems phases.

  20. Options Study - Phase II

    SciTech Connect (OSTI)

    R. Wigeland; T. Taiwo; M. Todosow; W. Halsey; J. Gehin

    2010-09-01T23:59:59.000Z

    The Options Study has been conducted for the purpose of evaluating the potential of alternative integrated nuclear fuel cycle options to favorably address the issues associated with a continuing or expanding use of nuclear power in the United States. The study produced information that can be used to inform decisions identifying potential directions for research and development on such fuel cycle options. An integrated nuclear fuel cycle option is defined in this study as including all aspects of the entire nuclear fuel cycle, from obtaining natural resources for fuel to the ultimate disposal of used nuclear fuel (UNF) or radioactive wastes. Issues such as nuclear waste management, especially the increasing inventory of used nuclear fuel, the current uncertainty about used fuel disposal, and the risk of nuclear weapons proliferation have contributed to the reluctance to expand the use of nuclear power, even though it is recognized that nuclear power is a safe and reliable method of producing electricity. In this Options Study, current, evolutionary, and revolutionary nuclear energy options were all considered, including the use of uranium and thorium, and both once-through and recycle approaches. Available information has been collected and reviewed in order to evaluate the ability of an option to clearly address the challenges associated with the current implementation and potential expansion of commercial nuclear power in the United States. This Options Study is a comprehensive consideration and review of fuel cycle and technology options, including those for disposal, and is not constrained by any limitations that may be imposed by economics, technical maturity, past policy, or speculated future conditions. This Phase II report is intended to be used in conjunction with the Phase I report, and much information in that report is not repeated here, although some information has been updated to reflect recent developments. The focus in this Options Study was to identify any nuclear fuel cycle technology or option that may result in a significant beneficial impact to the issues as compared to the current U.S. approach of once-through use of nuclear fuel in LWRs or similar reactors followed by direct disposal of UNF. This approach was taken because incremental differences may be difficult to clearly identify and justify due to the large uncertainties that can be associated with the specific causes of the issues. Phase II of this Options Study continued the review of nuclear fuel cycle options that was initiated and documented during Phase I, concentrating on reviewing and summarizing the potential of integrated nuclear fuel cycles. However, based on the reviews of previous studies and available data, it was not always possible to clearly determine sufficiently large differences between the various fuel cycle and technology options for some of the issues or evaluation measures, for example, in cases where only incremental differences with respect to the issues might be achieved regardless of the fuel cycle option or technologies being considered, or where differences were insufficient to clearly rise above the uncertainties.

  1. Nevada Transportatoion Options Study

    SciTech Connect (OSTI)

    P. GEHNER; E.M. WEAVER; L. FOSSUM

    2006-05-25T23:59:59.000Z

    This study performs a cost and schedule analysis of three Nevada Transportation options that support waste receipt at the repository. Based on the U.S. Department of Energy preference for rail transportation in Nevada (given in the Final Environmental Impact Statement), it has been assumed that a branch rail line would be constructed to support waste receipt at the repository. However, due to potential funding constraints, it is uncertain when rail will be available. The three Nevada Transportation options have been developed to meet a varying degree of requirements for transportation and to provide cost variations used in meeting the funding constraints given in the Technical Direction Letter guidelines for this study. The options include combinations of legal-weight truck, heavy-haul truck, and rail. Option 1 uses a branch rail line that would support initial waste receipt at the repository in 2010. Rail transportation would be the primary mode, supplemented by legal weight trucks. This option provides the highest level of confidence in cost and schedule, lowest public visibility, greatest public acceptability, lowest public dose, and is the recommended option for support of waste receipt. The completion of rail by 2010 will require spending approximately $800 million prior to 2010. Option 2 uses a phased rail approach to address a constrained funding scenario. To meet funding constraints, Option 2 uses a phased approach to delay high cost activities (final design and construction) until after initial waste receipt in 2010. By doing this, approximately 95 percent of the cost associated with completion of a branch rail line is deferred until after 2010. To support waste receipt until a branch rail line is constructed in Nevada, additional legal-weight truck shipments and heavy-haul truck shipments (on a limited basis for naval spent nuclear fuel) would be used to meet the same initial waste receipt rates as in Option 1. Use of heavy-haul shipments in the absence of rail is restricted to approximately twelve, without upgrading public highways. There is high uncertainty as to what road upgrades and security/escorts the Nevada Department of Transportation would require to obtain an overweight/overdimensional permit. In addition, the Naval Nuclear Propulsion Program has indicated that a larger cask weight than that analyzed in the Final Environmental Impact Statement may be required for naval shipments, resulting in additional costs for heavy-haul transport. These uncertainties result in a high cost and schedule risk. Option 3 assumes that the start of rail construction will be delayed until after construction authorization is received from the Nuclear Regulatory Commission. Similar to Option 2, Option 3 uses legal-weight truck shipments and limited heavy haul truck shipments to meet the same initial waste receipt rates as Option 1, until rail becomes available. By using heavy-haul truck for two years, Option 3 contains the same uncertainties and resultant high cost and schedule risk as Option 2. The cost and schedule of legal-weight truck transport are not included in this report as that will be evaluated in the report on national transportation.

  2. Pawnee Nation Energy Option Analyses

    SciTech Connect (OSTI)

    Matlock, M.; Kersey, K.; Riding In, C.

    2009-07-21T23:59:59.000Z

    Pawnee Nation of Oklahoma Energy Option Analyses In 2003, the Pawnee Nation leadership identified the need for the tribe to comprehensively address its energy issues. During a strategic energy planning workshop a general framework was laid out and the Pawnee Nation Energy Task Force was created to work toward further development of the tribe’s energy vision. The overarching goals of the “first steps” project were to identify the most appropriate focus for its strategic energy initiatives going forward, and to provide information necessary to take the next steps in pursuit of the “best fit” energy options. Description of Activities Performed The research team reviewed existing data pertaining to the availability of biomass (focusing on woody biomass, agricultural biomass/bio-energy crops, and methane capture), solar, wind and hydropower resources on the Pawnee-owned lands. Using these data, combined with assumptions about costs and revenue streams, the research team performed preliminary feasibility assessments for each resource category. The research team also reviewed available funding resources and made recommendations to Pawnee Nation highlighting those resources with the greatest potential for financially-viable development, both in the near-term and over a longer time horizon. Findings and Recommendations Due to a lack of financial incentives for renewable energy, particularly at the state level, combined mediocre renewable energy resources, renewable energy development opportunities are limited for Pawnee Nation. However, near-term potential exists for development of solar hot water at the gym, and an exterior wood-fired boiler system at the tribe’s main administrative building. Pawnee Nation should also explore options for developing LFGTE resources in collaboration with the City of Pawnee. Significant potential may also exist for development of bio-energy resources within the next decade. Pawnee Nation representatives should closely monitor market developments in the bio-energy industry, establish contacts with research institutions with which the tribe could potentially partner in grant-funded research initiatives. In addition, a substantial effort by the Kaw and Cherokee tribes is underway to pursue wind development at the Chilocco School Site in northern Oklahoma where Pawnee is a joint landowner. Pawnee Nation representatives should become actively involved in these development discussions and should explore the potential for joint investment in wind development at the Chilocco site. Financial incentives for project development are generally structured to provide tribes with access to conventional financing mechanisms. Grant funding for project construction is currently difficult to obtain. Substantial new opportunities for bio-fuel development may exist in the next few years with passage of the 2007 Farm Bill, and through opportunities made available through Oklahoma’s new Bio-energy Center. A review of potential alternatives to Pawnee Nation’s current electricity supply scenario revealed that a range of options could be viable. These include the following scenarios: business as usual, alternative supply, negotiate lower rates with City of Pawnee, focus on reducing energy usage, develop electric utility organization. Under any circumstances, Pawnee Nation should purse strategies to reduce energy usage, as this is the simplest means of reducing electric costs and environmental impacts. The research team also recommends that Pawnee Nation initiate some focused discussions with the City of Pawnee, with GRDA, and with IEC to discuss its wholesale supply purchase options. These discussions will better inform the Pawnee Energy Team of the specific pros and cons of its wholesale power supply options, and will assist the Team’s broader decision-making on utility-related issues. The ultimate path chosen by Pawnee Nation will depend on further consideration of priorities and potential barriers by Pawnee Nation’s Energy Team.

  3. Edit Test Options Page 1 Edit Test Options

    E-Print Network [OSTI]

    Xu, Shouhuai

    Edit Test Options Page 1 Edit Test Options Format Test Information 1. Enter a Name for the Test. 2. Choose a color for the title text of the Test. (Optional) 3. Enter a Description in the Text Box. The description is visible to Students before they click on the link to take the Test. (Optional) 4. If you want

  4. E-Print Network 3.0 - aids care services Sample Search Results

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    consultation and resources Summary: and referrals. Examples include: Housing Options Home Health Aides Evaluating care options Special needs... resources Transportation Services...

  5. Designing a Thermal Energy Storage Program for Electric Utilities

    E-Print Network [OSTI]

    Niehus, T. L.

    1994-01-01T23:59:59.000Z

    Electric utilities are looking at thermal energy storage technology as a viable demand side management (DSM) option. In order for this DSM measure to be effective, it must be incorporated into a workable, well-structured utility program. This paper...

  6. Identification and definition of unbundled electric generation and transmission services

    SciTech Connect (OSTI)

    Kirby, B.; Hirst, E.; Vancoevering, J.

    1995-03-01T23:59:59.000Z

    State and federal regulators, private and public utilities, large and small customers, power brokers and marketers, and others are engaged in major debates about the future structure of the electric industry. Although the outcomes are far from certain, it seems clear that customers will have much greater choices about the electric services they purchase and from whom they buy these services. This report examines the ``ancillary`` services that are today buried within the typical vertically integrated utility. These ancillary services support and make possible the provision of the basic services of generating capacity, energy supply, and power delivery. These ancillary services include: Management of generating units; reserve generating capacity to follow variations in customer loads, to provide capacity and energy when generating units or transmission lines suddenly fall, to maintain electric-system stability, and to provide local-area security; transmission-system monitoring and control; replacement of real power and energy losses; reactive-power management and voltage regulation; transmission reserves; repair and maintenance of the transmission network; metering, billing, and communications; and assurance of appropriate levels of power quality. Our focus in this report, the first output from a larger Oak Ridge National Laboratory project, is on identification and definition of these services. Later work in this project will examine more closely the costs and pricing options for each service.

  7. PFBC Utility Demonstration Project. Annual report, 1991

    SciTech Connect (OSTI)

    Not Available

    1992-11-01T23:59:59.000Z

    This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 & 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP`s proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

  8. Electricity prices in a competitive environment: Marginal cost pricing of generation services and financial status of electric utilities. A preliminary analysis through 2015

    SciTech Connect (OSTI)

    NONE

    1997-08-01T23:59:59.000Z

    The emergence of competitive markets for electricity generation services is changing the way that electricity is and will be priced in the United States. This report presents the results of an analysis that focuses on two questions: (1) How are prices for competitive generation services likely to differ from regulated prices if competitive prices are based on marginal costs rather than regulated {open_quotes}cost-of-service{close_quotes} pricing? (2) What impacts will the competitive pricing of generation services (based on marginal costs) have on electricity consumption patterns, production costs, and the financial integrity patterns, production costs, and the financial integrity of electricity suppliers? This study is not intended to be a cost-benefit analysis of wholesale or retail competition, nor does this report include an analysis of the macroeconomic impacts of competitive electricity prices.

  9. Thermal test options

    SciTech Connect (OSTI)

    Koski, J.A.; Keltner, N.R.; Sobolik, K.B.

    1993-02-01T23:59:59.000Z

    Shipping containers for radioactive materials must be qualified to meet a thermal accident environment specified in regulations, such at Title 10, Code of Federal Regulations, Part 71. Aimed primarily at the shipping container design, this report discusses the thermal testing options available for meeting the regulatory requirements, and states the advantages and disadvantages of each approach. The principal options considered are testing with radiant heat, furnaces, and open pool fires. The report also identifies some of the facilities available and current contacts. Finally, the report makes some recommendations on the appropriate use of these different testing methods.

  10. Economics & Finance Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    98 Economics & Finance Degree options MA or BSc (Single Honours Degrees) Applied Economics Economics Financial Economics BA (International Honours Degree) Economics (See page 51) MA or BSc (Joint Honours Degrees) Economics and one of: Geography Management Mathematics MA (Joint Honours Degrees

  11. Sustainable Office Lighting Options

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    Sustainable Office Lighting Options Task Lighting: Task lighting is a localized method of lighting a workspace so that additional, unnecessary lighting is eliminated, decreasing energy usage and costs. Illumination levels in the targeted work areas are higher with task lighting than with the ambient levels

  12. Computer Science Degree options

    E-Print Network [OSTI]

    Brierley, Andrew

    82 Computer Science Degree options BSc (Single Honours Degree) Computer Science BSc (Joint Honours Degrees) Computer Science and one of: Economics Logic and Philosophy of Science Management Management Science MSci (Single Honours Degree) Computer Science Entrance Requirements (see also pages 164 - 205

  13. Fuels options conference

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    The proceedings of the Fuels Options Conference held May 9-10, 1995 in Atlanta, Georgia are presented. Twenty-three papers were presented at the conference that dealt with fuels outlook; unconventional fuels; fuel specification, purchasing, and contracting; and waste fuels applications. A separate abstract was prepared for each paper for inclusion in the Energy Science and Technology Database.

  14. Idaho's Energy Options

    SciTech Connect (OSTI)

    Robert M. Neilson

    2006-03-01T23:59:59.000Z

    This report, developed by the Idaho National Laboratory, is provided as an introduction to and an update of the status of technologies for the generation and use of energy. Its purpose is to provide information useful for identifying and evaluating Idaho’s energy options, and for developing and implementing Idaho’s energy direction and policies.

  15. OVERVIEW OF CONTRACTING OPTIONS

    E-Print Network [OSTI]

    Waliser, Duane E.

    OVERVIEW OF CONTRACTING OPTIONS Presented by Bill McNally July 24, 2012 #12;National Aeronautics and Space Administration Selecting the Right Contract Type · Objective ­ Negotiate a contract type and price a Contract Type · What are your acquisition's objectives? ­ New program? ­ Existing program? (Historical

  16. The directory of United States coal & technology export resources. Profiles of domestic US corporations, associations and public entities, nationwide, which offer products or services suitable for export, relating to coal and its utilization

    SciTech Connect (OSTI)

    Not Available

    1994-01-01T23:59:59.000Z

    The purpose of this directory is to provide a listing of available U.S. coal and coal related resources to potential purchasers of those resources abroad. The directory lists business entities within the US which offer coal related resources, products and services for sale on the international market. Each listing is intended to describe the particular business niche or range of product and/or services offered by a particular company. The listing provides addresses, telephones, and telex/fax for key staff in each company committed to the facilitation of international trade. The content of each listing has been formulated especially for this directory and reflects data current as of the date of this edition. The directory listings are divided into four primary classifications: coal resources; technology resources; support services; and financing and resource packaging. The first three of which are subdivided as follows: Coal Resources -- coal derivatives, coal exporters, and coal mining; Technology Resources -- advanced utilization, architects and engineers, boiler equipment, emissions control and waste disposal systems, facility construction, mining equipment, power generation systems, technical publications, and transport equipment; Support Services -- coal transport, facility operations, freight forwarders, sampling services and equipment, and technical consultants. Listings for the directory were solicited on the basis of this industry breakdown. Each of the four sections of this directory begins with a matrix illustrating which companies fall within the particular subclassifications specific to that main classification. A general alphabetical index of companies and an index by product/service classification are provided following the last section of the directory.

  17. Federal Utility Program Overview (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2009-07-01T23:59:59.000Z

    Fact sheet overview of the U.S. Department of Energy (DOE) Federal Energy Management Program's (FEMP) Federal Utility Program, including common contracts and services available to Federal agencies through local serving utilities.

  18. Student Photos (utilizing bASSESS)-

    E-Print Network [OSTI]

    Cui, Yan

    listing. #12;Student Photos (utilizing bASSESS)- Step 10 · The next screen provides the followingStudent Photos (utilizing bASSESS)- Step 1 · Access Banner web page from the UTHSC homepage. #12;Student Photos (utilizing bASSESS)- Step 2 · Click "Self-Service Login." #12;Student Photos (utilizing b

  19. Colorado Springs Utilities- Energy Efficient Builder Program

    Broader source: Energy.gov [DOE]

    The Colorado Springs Utilities (CSU) Energy Efficient Builder Program offers an incentive to builders who construct ENERGY STAR® qualified homes within the CSU service area. The incentive range...

  20. Factors Affecting Option Premium Values

    E-Print Network [OSTI]

    Johnson, Jason; Smith, Jackie; Dhuyvetter, Kevin C.; Waller, Mark L.

    1999-06-23T23:59:59.000Z

    prices or buyers against ris- ing prices. A put option allows producers to establish a price floor or minimum selling price. With a put the producer can benefit from a price rally. The buyer of a put option pays an option premium but does not have... to establish a margin account. For this premium, the put option buyer has the right, but not the obliga- tion, to sell a futures contract at a predetermined price known as the ?strike? price. Call Options Call options protect buyers from rising prices...

  1. Convergence Speed of GARCH Option Price to Diffusion Option Price

    E-Print Network [OSTI]

    Chaudhuri, Sanjay

    Convergence Speed of GARCH Option Price to Diffusion Option Price Jin-Chuan Duan, Yazhen Wang that as the time interval between two consecutive observations shrinks to zero, a properly constructed GARCH model will weakly converge to a bivariate diffusion. Naturally the European option price under the GARCH model

  2. Convergence Speed of GARCH Option Price to Diffusion Option Price

    E-Print Network [OSTI]

    Wang, Yazhen

    Convergence Speed of GARCH Option Price to Diffusion Option Price Jin-Chuan Duan National constructed GARCH model will weakly converge to a bi- variate diffusion. Naturally the European option price under the GARCH model will also converge to its bivariate diffusion counterpart. This paper investigates

  3. Federal Utility Partnership Working Group Overview (FUPWG) (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2009-07-01T23:59:59.000Z

    Fact sheet overview of the Federal Utility Partnership Working Group (FUPWG), including group objectives, activities, and services.

  4. Hedging With a Put Option

    E-Print Network [OSTI]

    Anderson, Carl; Smith, Jackie; McCorkle, Dean; O'Brien, Daniel

    1999-06-23T23:59:59.000Z

    , corn options delivery months are December, March, May, July and September. Cotton delivery months are December, March, May, July, and October. Strike Price A put option is tied to a predetermined price level, in the underlying delivery month, at which...

  5. Milk Futures, Options and Basis

    E-Print Network [OSTI]

    Haigh, Michael; Stockton, Matthew; Anderson, David P.; Schwart Jr., Robert B.

    2001-10-12T23:59:59.000Z

    The milk futures and options market enables producers and processors to manage price risk. This publication explains hedging, margin accounts, basis and how to track it, and other fundamentals of the futures and options market....

  6. The Window Strategy with Options

    E-Print Network [OSTI]

    McCorkle, Dean; Amosson, Stephen H.; Fausett, Marvin

    1999-06-23T23:59:59.000Z

    The window strategy is one of several marketing strategies using futures and options to establish a floor price and allow for upside price potential. It also reduces option premium costs. This publication discusses how the window strategy works...

  7. The safeguards options study

    SciTech Connect (OSTI)

    Hakkila, E.A.; Mullen, M.F.; Olinger, C.T.; Stanbro, W.D. [Los Alamos National Lab., NM (United States); Olsen, A.P.; Roche, C.T.; Rudolph, R.R. [Argonne National Lab., IL (United States); Bieber, A.M.; Lemley, J. [Brookhaven National Lab., Upton, NY (United States); Filby, E. [Idaho National Engineering Lab., Idaho Falls, ID (United States)] [and others

    1995-04-01T23:59:59.000Z

    The Safeguards Options Study was initiated to aid the International Safeguards Division (ISD) of the DOE Office of Arms Control and Nonproliferation in developing its programs in enhanced international safeguards. The goal was to provide a technical basis for the ISD program in this area. The Safeguards Options Study has been a cooperative effort among ten organizations. These are Argonne National Laboratory, Brookhaven National Laboratory, Idaho National Engineering Laboratory, Lawrence Livermore National Laboratory, Los Alamos National Laboratory, Mound Laboratory, Oak Ridge National Laboratory, Pacific Northwest Laboratories, Sandia National Laboratories, and Special Technologies Laboratory. Much of the Motivation for the Safeguards Options Study is the recognition after the Iraq experience that there are deficiencies in the present approach to international safeguards. While under International Atomic Energy Agency (IAEA) safeguards at their declared facilities, Iraq was able to develop a significant weapons program without being noticed. This is because negotiated safeguards only applied at declared sites. Even so, their nuclear weapons program clearly conflicted with Iraq`s obligations under the Nuclear Nonproliferation Treaty (NPT) as a nonnuclear weapon state.

  8. Design options for clothes washers

    SciTech Connect (OSTI)

    Biermayer, Peter J.

    1996-10-01T23:59:59.000Z

    This report discusses possible design options for improving the energy efficiency of standard capacity, residential clothes washers.

  9. Natural Gas Utilities Options Analysis for the Hydrogen

    E-Print Network [OSTI]

    Natural Gas Gas Hydrates Kent Perry Executive Director Exploration & Production Technology Distributed Hydrogen Fuel Processing Low-Temperature Fuel Cells High-Temperature Fuel Cells Vehicle Fuel Infrastructure Gerry Runte Executive Director Hydrogen Energy Systems Gasification & Hot Gas Cleanup Process

  10. Mandatory Utility Green Power Option | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat JumpIncMAKGalway Bay(Held

  11. Natural Gas Utilities Options Analysis for the Hydrogen Economy |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F S i DOETowardExecutive SummaryDepartment of Energy Objectives:

  12. Natural Gas Utilities Options Analysis for the Hydrogen Economy |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F S i DOETowardExecutive SummaryDepartment of Energy

  13. A Laboratory Investigation of Deferral Options

    E-Print Network [OSTI]

    Oprea, Ryan; Friedman, Daniel; Anderson, Steven T

    2007-01-01T23:59:59.000Z

    T. and Antikarov, V. , 2003, “Real Options: A Practitioner’ssteady state. Keywords: Real options, optimal stopping,email Introduction Real options theory came of age in the

  14. Resources, real options, and corporate strategy

    E-Print Network [OSTI]

    Bernardo, Antonio; Chowdhry, Bhagwan

    1998-01-01T23:59:59.000Z

    211–234 Resources, real options, and corporate strategy $D83; G30; G31 Keywords: Real options; Valuation; Corporateparticipants at the Real Options Conference at Northwestern

  15. Transition Strategies: Government Options and Market Penetration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategies: Government Options and Market Penetration Scenarios Transition Strategies: Government Options and Market Penetration Scenarios Presentation on Transition Strategies:...

  16. Effects of reduced voltage on the operation and efficiency of electric systems. Volume 3. Field tests in a northern utility service area. Final report

    SciTech Connect (OSTI)

    Chen, M.S.; Shoults, R.R.

    1985-07-01T23:59:59.000Z

    Volume 3 of this three-volume report for RP1419-1 describes the tests on selected residential, commercial, and small industry areas of the Detroit Edison Company system and the statistical analysis performed on the test data gathered. The purpose of the field testing was to provide data to analyze changes in energy consumption due to changes in feeder voltage levels. Detroit Edison was chosen to represent a winter peaking load area. Original intent was to present these results simultaneously with results from a summer peaking load area, Texas Electric Service Company (TESCO). Unavoidable delays retarded the Detroit study results to this Volume 3. TESCO results were reported in Volume 1, and the Distribution System Analysis and Simulation (DSAS) program for these studies was presented in Volume 2 in the form of a User's Manual.

  17. Evaluating Utility System Operations Using APLUS

    E-Print Network [OSTI]

    Pethe, S.; Singh, R.

    "Evaluating utility System Operations Using APLUS" Sanjay Pethe Sr. Process Engineer TENSA Services, Inc. 6200 Savoy Drive, Ste. 540 Houston, Texas 77036 ABSTRACT The steam system at a recycled paper fiberboard plant in Texas... Figure 1: Schematic of Steam System 86 "Evaluating utility System Operations Using APLUS" Sanjay Pethe Sr. Process Engineer Rajiv Singh Sr. Process Engineer TENSA Services, Inc. 6200 Savoy Drive, Ste. 540 Houston, Texas 77036 TENSA Services, Inc. 6200...

  18. SHORT-TERM GENERATION ASSET VALUATION: A REAL OPTIONS APPROACH

    E-Print Network [OSTI]

    Tseng, Chung-Li

    using real options to value power plants with unit commitment constraints over a short-term period. We forward-moving Monte Carlo simulation with backward-moving dynamic programming. We assume that the power significantly overvalue a power plant. With deregulation of the electricity industry a global trend, utilities

  19. UTILIZATION OF ALASKAN SALMON CANNERY WASTE

    E-Print Network [OSTI]

    UTILIZATION OF ALASKAN SALMON CANNERY WASTE Marine Biological Laboratory iM0V3Ul953 WOODS HOLE and Wildlife Service, John L. Farley, Director UTILIZATION OP ALASKM SALMON CANlTEaT WASH PAHTS I AHD II, September 1953 #12;#12;UTILIZATION OF AUSKAN SALMON CANNERY WASTE y PART I 1. Possibility of Development

  20. Local Option- Property Tax Exemption

    Broader source: Energy.gov [DOE]

    Vermont allows municipalities the option of offering an exemption from the municipal real and personal property taxes for certain renewable energy systems (Note: state property taxes would still...

  1. Sustainable Energy: Choosing Among Options

    E-Print Network [OSTI]

    Mirza, Umar Karim

    2006-01-01T23:59:59.000Z

    Review: Sustainable Energy: Choosing Among Options Byand William A. Peters. Sustainable Energy: Choosing AmongAll the authors of Sustainable Energy are associated with

  2. DATA TRANSMISSION OPTIONS FOR VMT DATA AND FEE COLLECTION CENTERS

    E-Print Network [OSTI]

    Bertini, Robert L.

    , VMT fee, data processing, fuel tax alternatives, fee collection center, customer service center 18DATA TRANSMISSION OPTIONS FOR VMT DATA AND FEE COLLECTION CENTERS by Robert L. Bertini Kerri-based fee collection centers, including the identification of issues related to data transmission, data

  3. Rural Health Option The Rural Health Option requires

    E-Print Network [OSTI]

    Veiga, Pedro Manuel Barbosa

    Rural Health Option The Rural Health Option requires: Membership in StORM Club, the Students include up to 3 sites/3physician-mentors Enrollment into BOTH rural health electives for a total of 2.sumner@okstate.edu) o Spring: Perspectives in Rural Health for OMSI or OMSII (or OMSIII with special permission) CLME

  4. Communication Needs and Integration Options

    E-Print Network [OSTI]

    " links that carry data from smart meters to the control center. The consensus on HAN technologiesCommunication Needs and Integration Options for AMI in the Smart Grid Future Grid Initiative White System #12;Communication Needs and Integration Options for AMI in the Smart Grid Prepared for the Project

  5. Communication Needs and Integration Options

    E-Print Network [OSTI]

    home area networks (HANs) than "backhaul" links that carry data from smart meters to the control centerCommunication Needs and Integration Options for AMI in the Smart Grid Future Grid Initiative White System #12;Communication Needs and Integration Options for AMI in the Smart Grid Prepared for the Project

  6. Solid Target Options S. Childress

    E-Print Network [OSTI]

    McDonald, Kirk

    power is higher than for existing solid target designs - but not by a large factor. · NuMI graphite beam power) · High beam power solid targets frequently use higher z materials for increased yield plusSolid Target Options NuFACT'00 S. Childress Solid Target Options · The choice of a primary beam

  7. AFCI Options Study

    SciTech Connect (OSTI)

    R. Wigeland; T. Taiwo; M. Todosow; W. Halsey; J. Gehin

    2009-09-01T23:59:59.000Z

    This report describes the background and framework for both organizing the discussion and providing information on the potential for nuclear energy R&D to develop alternative nuclear fuel cycles that would address the issues with the current implementations of nuclear power, including nuclear waste disposal, proliferation risk, safety, security, economics, and sustainability. The disposition of used fuel is the cause of many of the concerns, and the possible approaches to used fuel management identify a number of basic technology areas that need to be considered. The basic science in each of the technology areas is discussed, emphasizing what science is currently available, where scientific knowledge may be insufficient, and especially to identify specific areas where transformational discoveries may allow achievement of performance goals not currently attainable. These discussions lead to the wide range of technical options that have been the basis for past and current research and development on advanced nuclear fuel cycles in the United States. The results of this work are then briefly reviewed to show the extent to which such approaches are capable of addressing the issues with nuclear power, the potential for moving further, and the inherent limitations.

  8. Employee Benefit Options

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Region service area. TheEPSCI Home It is the|Resources

  9. Expanding the Pool of Federal Policy Options to Promote Industrial Energy Efficiency

    SciTech Connect (OSTI)

    Brown, Dr. Marilyn Ann [Georgia Institute of Technology] [Georgia Institute of Technology; Cox, Matthew [Georgia Institute of Technology] [Georgia Institute of Technology; Jackson, Roderick K [ORNL] [ORNL; Lapsa, Melissa Voss [ORNL] [ORNL

    2011-01-01T23:59:59.000Z

    Improving the energy efficiency of industry is essential for maintaining the viability of domestic manufacturing, especially in a world economy where production is shifting to low-cost, less regulated developing countries. Numerous studies have shown the potential for significant cost-effective energy-savings in U.S. industries, but the realization of this potential is hindered by regulatory, information, workforce, and financial obstacles. This report evaluates seven federal policy options aimed at improving the energy efficiency of industry, grounded in an understanding of industrial decision-making and the barriers to efficiency improvements. Detailed analysis employs the Georgia Institute of Technology's version of the National Energy Modeling System and spreadsheet calculations, generating a series of benefit/cost metrics spanning private and public costs and energy bill savings, as well as air pollution benefits and the social cost of carbon. Two of the policies would address regulatory hurdles (Output-Based Emissions Standards and a federal Energy Portfolio Standard with Combined Heat and Power); three would help to fill information gaps and workforce training needs (the Superior Energy Performance program, Implementation Support Services, and a Small Firm Energy Management program); and two would tackle financial barriers (Tax Lien Financing and Energy-Efficient Industrial Motor Rebates). The social benefit-cost ratios of these policies appear to be highly favorable based on a range of plausible assumptions. Each of the seven policy options has an appropriate federal role, broad applicability across industries, utilizes readily available technologies, and all are administratively feasible.

  10. E-Print Network 3.0 - analytical services management Sample Search...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Administration... Travel Management Services Technology Resources for Employee & Campus Services Utilities & Energy... - Facilities Management Campus Safety & ... Source: Patzek,...

  11. The Utility Energy Savings Contract for Brookhaven National Laboratory

    E-Print Network [OSTI]

    Johnson, Peter D.

    The Utility Energy Savings Contract for Brookhaven National Laboratory Evelyn Landini Director;2 Tonight's Presentation Answering the questions: ­ What is a Utility Energy Services Contract? ­ Advantages of the contract? · Where will the efficiencies be found? #12;3 What is a Utility Energy Services Contract (or

  12. Russian prospects for plutonium utilization

    SciTech Connect (OSTI)

    Kudriavtsev, E.G.; Mikerin, E.I. [Ministry for Atomic Energy of Russian Federation, Moscow (Russian Federation)

    1993-12-31T23:59:59.000Z

    The main figures and options are given in this paper on plutonium build-up under various conditions of the Russian nuclear fuel cycle final stage. The real possibility of useful utilization of plutonium being recovered at the NPP fuel radiochemical reprocessing or becoming available as a result of disarmament, is connected with its involvement into the BN-800 and VVER-1000 fuel cycles. A reviews of the main installations for production of MOX-fuel for scientific studies and pilot testing on plutonium utilization in fast reactors has been made. The trends for investigations and developments being designed and aimed at plutonium optimum utilization in nuclear power engineering of the Russian Federation are presented.

  13. EVALUATION OF TRANSPORTATION OPTIONS FOR INTERMEDIATE NON DESTRUCTIVE EXAMINATIONS

    SciTech Connect (OSTI)

    Case, Susan; Hoggard, Gary

    2014-07-01T23:59:59.000Z

    Idaho National Laboratory (INL) shipments of irradiated experiments from the Advanced Test Reactor (ATR) to the Hot Fuels Examination Facility (HFEF) have historically been accomplished using the General Electric Model 2000 (GE 2000) Type B shipping container. Battelle Energy Alliance (BEA) concerns regarding the future availability and leasing and handling costs associated with the GE 2000 cask have warranted an evaluation of alternative shipping options. One or more of these shipping options may be utilized to perform non destructive examinations (NDE) such as neutron radiography and precision gamma scans of irradiated experiments at HFEF and then return the experiments to ATR for further irradiation, hereafter referred to as “intermediate NDE.”

  14. Advanced Nuclear Fuel Cycle Options

    SciTech Connect (OSTI)

    Roald Wigeland; Temitope Taiwo; Michael Todosow; William Halsey; Jess Gehin

    2010-06-01T23:59:59.000Z

    A systematic evaluation has been conducted of the potential for advanced nuclear fuel cycle strategies and options to address the issues ascribed to the use of nuclear power. Issues included nuclear waste management, proliferation risk, safety, security, economics and affordability, and sustainability. The two basic strategies, once-through and recycle, and the range of possibilities within each strategy, are considered for all aspects of the fuel cycle including options for nuclear material irradiation, separations if needed, and disposal. Options range from incremental changes to today’s implementation to revolutionary concepts that would require the development of advanced nuclear technologies.

  15. The Farm Credit Crisis: Policy Options and Consequences.

    E-Print Network [OSTI]

    Duncan, Marvin; Harrington, David H.; Brake, John; Boehlje, Michael; Lee, Warren; Barry, Peter J.; Penson, John B.; Hughes, Dean W.; Knutson, Ronald D.: Richardson, James W.; Jolly, Robert W.; Lins, David A.; Klinefelter, Danny A.; Guither, Harold D.; Marshall, J. Paxton; Barkley, Paul W.

    1986-01-01T23:59:59.000Z

    IUU\\,., Z TA245.7 8873 NO.1532 8-1532 ~ Texas Agricultural Extension Service -P~fJ& 1I~tA!/ P~fJ& --------=-. ------- Ifhe Farm Credit Crisis: Policy Opt~ons and ,Consequences LI3RAnv APR 181986 -l~ ? '. University Texas Agricultural... to the need for a comprehensive documentation of the broad spectrum of policy options available to deal with the farm credit crisis. Emphasis is placed upon a description of options and their consequences. The topics covered in the articles were...

  16. Options for Kentucky's Energy Future

    SciTech Connect (OSTI)

    Larry Demick

    2012-11-01T23:59:59.000Z

    Three important imperatives are being pursued by the Commonwealth of Kentucky: ? Developing a viable economic future for the highly trained and experienced workforce and for the Paducah area that today supports, and is supported by, the operations of the US Department of Energy’s (DOE’s) Paducah Gaseous Diffusion Plant (PGDP). Currently, the PGDP is scheduled to be taken out of service in May, 2013. ? Restructuring the economic future for Kentucky’s most abundant indigenous resource and an important industry – the extraction and utilization of coal. The future of coal is being challenged by evolving and increasing requirements for its extraction and use, primarily from the perspective of environmental restrictions. Further, it is important that the economic value derived from this important resource for the Commonwealth, its people and its economy is commensurate with the risks involved. Over 70% of the extracted coal is exported from the Commonwealth and hence not used to directly expand the Commonwealth’s economy beyond the severance taxes on coal production. ? Ensuring a viable energy future for Kentucky to guarantee a continued reliable and affordable source of energy for its industries and people. Today, over 90% of Kentucky’s electricity is generated by burning coal with a delivered electric power price that is among the lowest in the United States. Anticipated increased environmental requirements necessitate looking at alternative forms of energy production, and in particular electricity generation.

  17. A real options approach to criminal careers

    E-Print Network [OSTI]

    Aguiar de Oliveira, Cristiano

    2012-01-01T23:59:59.000Z

    J. (2004) Criminal behavior: A real option approach with anTrigeorgis, L. (1996) Real Options. Cambridge: MIT Press.A real options approach to criminal careers Cristiano Aguiar

  18. Patents and R& D as Real Options

    E-Print Network [OSTI]

    Schwartz, Eduardo S.

    2002-01-01T23:59:59.000Z

    Information Technology as Real Options, UCLA Working Paper.Patents and R&D as Real Options* September 2001 RevisedPatents and R&D as Real Options Abstract This article

  19. Utility Formation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500II Field EmissionFunctional MaterialsRobertUtility-Formation

  20. An Energy Services Initiative

    E-Print Network [OSTI]

    Beasley, R. C.; Tipton, J. K.; Ehmer, R. C.

    , and power quality needs. The subsidiary will continually search the horizon for emerging technologies to enhance its ability to deliver comprehensive and customized energy solutions. The approach to marketing these services supplements the electric utility...

  1. Departmental Energy and Utilities Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-04-15T23:59:59.000Z

    To establish requirements and responsibilities for managing Department of Energy (DOE) energy and utility supplies and services. Cancels paragraphs 6d(2), 6h, 7b(1), 7b(2), and 7e(16) of DOE O 430.1A) Cancels: DOE O 430.2, DOE O 430.1A (in part)

  2. Hydrogen Delivery Infrastructure Options Analysis

    Fuel Cell Technologies Publication and Product Library (EERE)

    This report, by the Nexant team, documents an in-depth analysis of seven hydrogen delivery options to identify the most cost-effective hydrogen infrastructure for the transition and long term. The pro

  3. INTEGRATIVE BIOSCIENCES (IBIOS) GRADUATE PROGRAM OPTION

    E-Print Network [OSTI]

    dePamphilis, Claude

    INTEGRATIVE BIOSCIENCES (IBIOS) GRADUATE PROGRAM OPTION IN Bioinformatics and Genomics (BG) Degree-Faculty Relation----------------------------------------------------------------- 8 Bioinformatics and Genomics--------------------------------------------------------------------------------------------------17 #12;- -3 Bioinformatics and Genomics Option (BG

  4. Hydrogen Delivery Infrastructure Analysis, Options and Trade...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis, Options and Trade-offs, Transition and Long-term Hydrogen Delivery Infrastructure Analysis, Options and Trade-offs, Transition and Long-term Presentation on Hydrogen...

  5. Final Report - Hydrogen Delivery Infrastructure Options Analysis...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Hydrogen Delivery Infrastructure Options Analysis Final Report - Hydrogen Delivery Infrastructure Options Analysis This report, by the Nexant team, documents an in-depth analysis...

  6. Final Report - Hydrogen Delivery Infrastructure Options Analysis

    Broader source: Energy.gov (indexed) [DOE]

    pipelines for gaseous hydrogen delivery Option 2: Use of existing natural gas or oil pipelines for gaseous hydrogen delivery Option 3: Use of existing natural gas pipelines...

  7. Tribal Utility Feasibility Study

    SciTech Connect (OSTI)

    Engel, R. A.; Zoellick, J. J.

    2007-06-30T23:59:59.000Z

    The Schatz Energy Research Center (SERC) assisted the Yurok Tribe in investigating the feasibility of creating a permanent energy services program for the Tribe. The original purpose of the DOE grant that funded this project was to determine the feasibility of creating a full-blown Yurok Tribal electric utility to buy and sell electric power and own and maintain all electric power infrastructure on the Reservation. The original project consultant found this opportunity to be infeasible for the Tribe. When SERC took over as project consultant, we took a different approach. We explored opportunities for the Tribe to develop its own renewable energy resources for use on the Reservation and/or off-Reservation sales as a means of generating revenue for the Tribe. We also looked at ways the Tribe can provide energy services to its members and how to fund such efforts. We identified opportunities for the development of renewable energy resources and energy services on the Yurok Reservation that fall into five basic categories: • Demand-side management – This refers to efforts to reduce energy use through energy efficiency and conservation measures. • Off-grid, facility and household scale renewable energy systems – These systems can provide electricity to individual homes and Tribal facilities in areas of the Reservation that do not currently have access to the electric utility grid. • Village scale, micro-grid renewable energy systems - These are larger scale systems that can provide electricity to interconnected groups of homes and Tribal facilities in areas of the Reservation that do not have access to the conventional electric grid. This will require the development of miniature electric grids to serve these interconnected facilities. • Medium to large scale renewable energy development for sale to the grid – In areas where viable renewable energy resources exist and there is access to the conventional electric utility grid, these resources can be developed and sold to the wholesale electricity market. • Facility scale, net metered renewable energy systems – These are renewable energy systems that provide power to individual households or facilities that are connected to conventional electric utility grid.

  8. Utility Energy Services Contracts: Enabling Documents

    Broader source: Energy.gov (indexed) [DOE]

    9, 2000, Richard Butterworth, GSA - authorized to enter contracts for terms greater than ten years * Relationship of the Anti-Deficiency Act to Multi- year Contracts June 22,...

  9. Utility Energy Services Contracts: Enabling Documents

    Broader source: Energy.gov [DOE]

    Presentation covers the FUPWG 2006 Fall meeting, held on November 1-2, 2006 in San Francisco, California.

  10. Utility Energy Services Contracts: Enabling Documents Update

    Broader source: Energy.gov (indexed) [DOE]

    Agreement (pending final review and approval) Sample Documents UESC Sample Documents &1; Task Order under Areawide contract &1; Task Order under Basic Ordering Agreement (BOA) with...

  11. Utility Energy Service Contracts | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned SmallOf The 2012Nuclear Guide Remote Access toDeployment |Project Funding

  12. Rural Utilities Service | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g Grant ofRichardton Abbey Wind Farm ItRoscoe

  13. Utility Energy Service Contracts - Lessons Learned

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyTheTwo New12.'6/0.2Contract (UESC) is not an Energy

  14. Graduate Procedures Master of Science in Food and Nutrition Services and Coordinated Program

    E-Print Network [OSTI]

    Elsherbeni, Atef Z.

    1 Graduate Procedures Master of Science in Food and Nutrition Services in nutrition, food service management, dietetics, and child nutrition program management. · The Coordinated with emphasis option of Child and Adolescent Nutrition (CAN) or Food Service Administration (FSA). Department

  15. PPL Electric Utilities- Commercial and Industrial Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    PPL Electric Utilities offers rebates and incentives for commercial and industrial products installed in their service area. The program offers rebates for lighting, heat pumps, refrigeration...

  16. Clark Public Utilities- Commercial Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Clark Public Utilities (CPU) offers a variety of energy efficiency rebates and services to help commercial and industrial customers save energy in existing and new facilities. Clark Public...

  17. MuniHELPS- Offered by 17 Utilities through the MMWEC

    Broader source: Energy.gov [DOE]

    The Massachusetts Municipal Wholesale Electric Company (MMWEC) provides the Home Energy Loss Prevention Services (HELPS) Program to seventeen municipal utilities in Massachusetts.

  18. UNICOR Renewable Energy Group Solar Program and Service Offerings...

    Office of Environmental Management (EM)

    UNICOR Renewable Energy Group Solar Program and Service Offerings UNICOR Renewable Energy Group Solar Program and Service Offerings Presentation-for the Federal Utility Partnership...

  19. Federal Utility Partnership Working Group Utility Partners

    Broader source: Energy.gov [DOE]

    Federal Utility Partnership Working Group (FUPWG) utility partners are eager to work closely with Federal agencies to help achieve energy management goals.

  20. Home Health and Informal Care Utilization

    E-Print Network [OSTI]

    Home Health and Informal Care Utilization and Costs Over Time in Alzheimer's Disease Carolyn W. Zhu, NY 10468 (E-mail: Carolyn.zhu@mssm.edu). Home Health Care Services Quarterly, Vol. 27(1) 2008, and (3) estimate possible interdependence of home health and informal care utilization. Methods

  1. features Utility Generator

    E-Print Network [OSTI]

    Chang, Shih-Fu

    #12;#12;#12;#12;features function utility Training Pool Utility Generator Per-frame function content utility classes utility classes utility Tree Decision Generator Module Utility Clustering Adaptive Content Classification Loop features content VO selection & Utility Selector content features Real

  2. Cloud Services Cloud Services

    E-Print Network [OSTI]

    Cloud Services Cloud Services In 2012 UCD IT Services launched an exciting new set of cloud solutions called CloudEdu, which includes cloud servers, cloud storage, cloud hosting and cloud network. The CloudEdu package includes a consultancy service in design, deployment, management and utilisation

  3. Design Evolution Study - Aging Options

    SciTech Connect (OSTI)

    P. McDaniel

    2002-04-05T23:59:59.000Z

    The purpose of this study is to identify options and issues for aging commercial spent nuclear fuel received for disposal at the Yucca Mountain Mined Geologic Repository. Some early shipments of commercial spent nuclear fuel to the repository may be received with high-heat-output (younger) fuel assemblies that will need to be managed to meet thermal goals for emplacement. The capability to age as much as 40,000 metric tons of heavy metal of commercial spent nuclear he1 would provide more flexibility in the design to manage this younger fuel and to decouple waste receipt and waste emplacement. The following potential aging location options are evaluated: (1) Surface aging at four locations near the North Portal; (2) Subsurface aging in the permanent emplacement drifts; and (3) Subsurface aging in a new subsurface area. The following aging container options are evaluated: (1) Complete Waste Package; (2) Stainless Steel inner liner of the waste package; (3) Dual Purpose Canisters; (4) Multi-Purpose Canisters; and (5) New disposable canister for uncanistered commercial spent nuclear fuel. Each option is compared to a ''Base Case,'' which is the expected normal waste packaging process without aging. A Value Engineering approach is used to score each option against nine technical criteria and rank the options. Open issues with each of the options and suggested future actions are also presented. Costs for aging containers and aging locations are evaluated separately. Capital costs are developed for direct costs and distributable field costs. To the extent practical, unit costs are presented. Indirect costs, operating costs, and total system life cycle costs will be evaluated outside of this study. Three recommendations for aging commercial spent nuclear fuel--subsurface, surface, and combined surface and subsurface are presented for further review in the overall design re-evaluation effort. Options that were evaluated but not recommended are: subsurface aging in a new subsurface area (high cost); surface aging in the complete waste package (risk to the waste package and impact on the Waste Handling Facility); and aging in the stainless steel liner (impact on the waste package design and new high risk operations added to the waste packaging process). The selection of a design basis for aging will be made in conjunction with the other design re-evaluation studies.

  4. Does Contracting Transit Service Save Money?

    E-Print Network [OSTI]

    McCullough, William S.; Taylor, Brian D.; Wachs, Martin

    1997-01-01T23:59:59.000Z

    wage rates. In some cases contracting for service may be theby other strategies. Contracting is a viable option for manye y e r , Privatization Contracting, p p . 1 -11, 1 9 8 7 .

  5. Utilization Analysis Page 1 UTILIZATION ANALYSIS

    E-Print Network [OSTI]

    Oliver, Douglas L.

    Utilization Analysis Page 1 UTILIZATION ANALYSIS Section 46a-68-40 and HIRING/PROMOTION GOALS utilized in the Health Center's workforce, the numbers of protected classes in the workforce must conducted for each occupational category and position classification. The Utilization Analysis was performed

  6. utility functions scaling profiles utility-fair

    E-Print Network [OSTI]

    Chang, Shih-Fu

    bandwidth utility functions scaling profiles utility-fair I. INTRODUCTION The emerging MPEG-4 video. This can result in a significant increase in the utilization of network capacity [1]. These techniques. Bandwidth utility functions [9] can be used to characterize an application's capability to adapt over

  7. Cogeneration - A Utility Perspective

    E-Print Network [OSTI]

    Williams, M.

    1983-01-01T23:59:59.000Z

    are discussed from a utility perspective as how they influence utility participation in future projects. The avoided cost methodology is examined, and these payments for sale of energy to the utility are compared with utility industrial rates. In addition...

  8. Utility Monitor September 2010

    E-Print Network [OSTI]

    Utility Monitor September 2010 Why monitor utility syntax? Enforce and Maintain Company-Wide DB2 Utility Standards. Jennifer Nelson Product Specialist, Rocket Software © 2010 IBM Corporation © 2010............................................................................................................... iv 1 Why Monitor DB2 Utility Syntax

  9. Electricity demand-side management for an energy efficient future in China : technology options and policy priorities

    E-Print Network [OSTI]

    Cheng, Chia-Chin

    2005-01-01T23:59:59.000Z

    The main objective of this research is to identify robust technology and policy options which achieve substantial reductions in electricity demand in China's Shandong Province. This research utilizes a scenario-based ...

  10. NET PRED UTILITY

    Energy Science and Technology Software Center (OSTI)

    002602IBMPC00 Normalized Elution Time Prediction Utility  http://omics.pnl.gov/software/NETPredictionUtility.php 

  11. Utility battery storage systems program report for FY 94

    SciTech Connect (OSTI)

    Butler, P.C.

    1995-03-01T23:59:59.000Z

    Sandia National Laboratories, New Mexico, conducts the Utility Battery Storage Systems Program, which is sponsored by the US Department of Energy`s Office of Energy Management. The goal of this program is to assist industry in developing cost-effective battery systems as a utility resource option by 2000. Sandia is responsible for the engineering analyses, contracted development, and testing of rechargeable batteries and systems for utility energy storage applications. This report details the technical achievements realized during fiscal year 1994.

  12. Partnerships with the U.S. Postal Service

    SciTech Connect (OSTI)

    Not Available

    2000-07-01T23:59:59.000Z

    Utility partnership upgrades energy system to help meet the General Services Administration's (GSA) energy-saving goals.

  13. University Services Management Services

    E-Print Network [OSTI]

    Webb, Peter

    system U Services Finance organized a workforce planning process resulting in a team with better capacity > 3 Primary Services Human Resources Workforce Planning Recruitment and Selection Employee and Labor, and strategic planning efforts. In addition to supporting the University Services enterprise, the Management

  14. Integrating Solar PV into Energy Services Performance Contracts: Options

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergy Health andofIan Kalin About32C:\DocumentsProgram ManagementAdapting

  15. Depleted uranium disposal options evaluation

    SciTech Connect (OSTI)

    Hertzler, T.J.; Nishimoto, D.D.; Otis, M.D. [Science Applications International Corp., Idaho Falls, ID (United States). Waste Management Technology Div.

    1994-05-01T23:59:59.000Z

    The Department of Energy (DOE), Office of Environmental Restoration and Waste Management, has chartered a study to evaluate alternative management strategies for depleted uranium (DU) currently stored throughout the DOE complex. Historically, DU has been maintained as a strategic resource because of uses for DU metal and potential uses for further enrichment or for uranium oxide as breeder reactor blanket fuel. This study has focused on evaluating the disposal options for DU if it were considered a waste. This report is in no way declaring these DU reserves a ``waste,`` but is intended to provide baseline data for comparison with other management options for use of DU. To PICS considered in this report include: Retrievable disposal; permanent disposal; health hazards; radiation toxicity and chemical toxicity.

  16. Fuel option for gas turbine

    SciTech Connect (OSTI)

    Tantayakom, S. [Electricity Generating Authority of Thailand, Nonthaburi (Thailand). Chemical and Analysis Dept.

    1995-12-31T23:59:59.000Z

    Growth in electricity demand is an average of 10% per year. Energy, emission, and economy are importance of critical concerns for generating systems. Therefore, combined cycle power plant is preferred to Electricity Generating Authority of Thailand (EGAT) new power generating capacity. The various option of available fuel for gas turbine are natural gas, liquid fuel and coal fuel. Particularly with the tremendous price increases in imported and domestic fuel supplies, natural gas is an attractive low cost alternative for power generation. EGAT has researched using heavy fuel instead of natural gas since the year 1991. The problems of various corrosion characteristics have been found. In addition, fuel treatment for gas turbine are needed, and along with it, the environmental consideration are options that provide the limitation of environmental regulation.

  17. Early Exercise Option Valuation 00000001111111

    E-Print Network [OSTI]

    Oosterlee, Cornelis W. "Kees"

    Early Exercise Option Valuation 0 0 1 1 00000001111111 s T 0 0s K Mm+1m t 0 With V (tM , S(tM)) = E. Computational Finance (Summerschool) Hitotsubashi University August 2009 2 / 51 #12;The CONV method (Carr-Madan extended) The main premise of the CONV method is that f (y|x) depends on x and y via f (y|x) = f (y - x

  18. The new option view of investment

    E-Print Network [OSTI]

    Dixit, Avinash K.

    1995-01-01T23:59:59.000Z

    This paper provides a simple introduction to the new option view of investment. We explain the shortcomings of the orthodox theory, and then outline the basic ideas behind the option framework. Several industry examples ...

  19. Options for Control of Reactive Power by Distributed Photovoltaic Generators

    E-Print Network [OSTI]

    Sulc, Petr; Backhaus, Scott; Chertkov, Michael

    2010-01-01T23:59:59.000Z

    High penetration levels of distributed photovoltaic(PV) generation on an electrical distribution circuit present several challenges and opportunities for distribution utilities. Rapidly varying irradiance conditions may cause voltage sags and swells that cannot be compensated by slowly responding utility equipment resulting in a degradation of power quality. Although not permitted under current standards for interconnection of distributed generation, fast-reacting, VAR-capable PV inverters may provide the necessary reactive power injection or consumption to maintain voltage regulation under difficult transient conditions. As side benefit, the control of reactive power injection at each PV inverter provides an opportunity and a new tool for distribution utilities to optimize the performance of distribution circuits, e.g. by minimizing thermal losses. We discuss and compare via simulation various design options for control systems to manage the reactive power generated by these inverters. An important design de...

  20. Assessment for advanced fuel cycle options in CANDU

    SciTech Connect (OSTI)

    Morreale, A.C.; Luxat, J.C. [McMaster University, 1280 Main St. W. Hamilton, Ontario, L8S 4L7 (Canada); Friedlander, Y. [AMEC-NSS Ltd., 700 University Ave. 4th Floor, Toronto, Ontario, M5G 1X6 (Canada)

    2013-07-01T23:59:59.000Z

    The possible options for advanced fuel cycles in CANDU reactors including actinide burning options and thorium cycles were explored and are feasible options to increase the efficiency of uranium utilization and help close the fuel cycle. The actinide burning TRUMOX approach uses a mixed oxide fuel of reprocessed transuranic actinides from PWR spent fuel blended with natural uranium in the CANDU-900 reactor. This system reduced actinide content by 35% and decreased natural uranium consumption by 24% over a PWR once through cycle. The thorium cycles evaluated used two CANDU-900 units, a generator and a burner unit along with a driver fuel feedstock. The driver fuels included plutonium reprocessed from PWR, from CANDU and low enriched uranium (LEU). All three cycles were effective options and reduced natural uranium consumption over a PWR once through cycle. The LEU driven system saw the largest reduction with a 94% savings while the plutonium driven cycles achieved 75% savings for PWR and 87% for CANDU. The high neutron economy, online fuelling and flexible compact fuel make the CANDU system an ideal reactor platform for many advanced fuel cycles.

  1. Numerical Valuation of Discrete Barrier Options with

    E-Print Network [OSTI]

    Chu, Hao-hua

    Numerical Valuation of Discrete Barrier Options with the Adaptive Mesh Model and Other Competing for discrete barrier options such that many methods have been suggested and declared to price discrete barrier options fast and accurately but no one can tell exactly that what method is the best. We also make

  2. General Order Ensuring Reliable Electric Service (Louisiana)

    Broader source: Energy.gov [DOE]

    The standards set forth herein have been developed to provide consumers, the Louisiana Public Service Commission, and jurisdictional electric utilities with a uniform method of ensuring reliable...

  3. Utility Theory Social Intelligence

    E-Print Network [OSTI]

    Polani, Daniel

    Utility Theory Social Intelligence Daniel Polani Utility Theory ­ p.1/15 Utilities: Motivation Consider: game scenario For Instance: 2-or-more players Necessary: development of concept for utilities decisions sequential decisions (time) games Utility The Prototypical Scenario Consider: agent that can take

  4. E-Print Network 3.0 - assistance relief services Sample Search...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Relief Options Paper October 2008 Summary: : A mortgage relief scheme is essentially a public support service, providing financial assistance... relief assistance in NSW and...

  5. Implementation of solar-reflective surfaces: Materials and utility programs

    SciTech Connect (OSTI)

    Bretz, S.; Akbari, H.; Rosenfeld, A.; Taha, H.

    1992-06-01T23:59:59.000Z

    This report focuses on implementation issues for using solar-reflective surfaces to cool urban heat islands, with specific examples for Sacramento, California. Advantages of solar-reflective surfaces for reducing energy use are: (1) they are cost-effective if albedo is increased during routine maintenance; (2) the energy savings coincide with peak demand for power; (3) there are positive effects on environmental quality; and (4) the white materials have a long service life. Important considerations when choosing materials for mitigating heat islands are identified as albedo, emissivity, durability, cost, pollution and appearance. There is a potential for increasing urban albedo in Sacramento by an additional 18%. Of residential roofs, we estimate that asphalt shingle and modified bitumen cover the largest area, and that built-up roofing and modified bitumen cover the largest area of commercial buildings. For all of these roof types, albedo may be increased at the time of re-roofing without any additional cost. When a roof is repaired, a solar-reflective roof coating may be applied to significantly increase albedo and extend the life of the root Although a coating may be cost-effective if applied to a new roof following installation or to an older roof following repair, it is not cost-effective if the coating is applied only to save energy. Solar-reflective pavement may be cost-effective if the albedo change is included in the routine resurfacing schedule. Cost-effective options for producing light-colored pavement may include: (1) asphalt concrete, if white aggregate is locally available; (2) concrete overlays; and (3) newly developed white binders and aggregate. Another option may be hot-rolled asphalt, with white chippings. Utilities could promote solar-reflective surfaces through advertisement, educational programs and cost-sharing of road resurfacing.

  6. Valuation of Information Technology Investments as Real Options

    E-Print Network [OSTI]

    Schwartz, Eduardo S.; Zozaya-Gorostiza, Carlos

    2000-01-01T23:59:59.000Z

    1999) A Case for Using Real Options Pricing Analysis toExpansion Using Real Options Analysis. MIS Quarterly. Vol.Investment Opportunities as Real Options: Getting Started on

  7. Quality electric motor repair: A guidebook for electric utilities

    SciTech Connect (OSTI)

    Schueler, V.; Douglass, J.

    1995-08-01T23:59:59.000Z

    This guidebook provides utilities with a resource for better understanding and developing their roles in relation to electric motor repair shops and the industrial and commercial utility customers that use them. The guidebook includes information and tools that utilities can use to raise the quality of electric motor repair practices in their service territories.

  8. A VAX/VMS mapped section/virtual memory utility package: Yucca Mountain Project

    SciTech Connect (OSTI)

    Yarrington, L.

    1990-02-01T23:59:59.000Z

    A VAX/VMS Mapped Section/Virtual Memory Utility Package is a collection of FORTRAN subprograms that allocate virtual memory and, optionally, map that memory to a file. The subprograms use VMS system services and run-time libraries for allocating and mapping memory; therefore, the utility package is system dependent and functional on that platform only. FORTRAN-77 is one of the most widely used languages for computer programming. Languages have been developed in the past few decades that provide more powerful tools than FORTRAN and overcome some of its limitations. Two limitations addressed by this paper which have been a source of frustration to many programmers are that (1) FORTRAN does not provide dynamic array allocation and (2) FORTRAN file input-output is very slow. The solutions presented here are for the VAX/VMS operating system and use system services that are not part of the standard FORTRAN language description. Also discussed in this paper are dynamic array allocation, mapped sections of the program memory, and support modules. 3 refs.

  9. Adaptation policies to increase terrestrial ecosystem resilience: potential utility of a multicriteria approach

    SciTech Connect (OSTI)

    de Bremond, Ariane; Engle, Nathan L.

    2014-03-01T23:59:59.000Z

    Climate change is rapidly undermining terrestrial ecosystem resilience and capacity to continue providing their services to the benefit of humanity and nature. Because of the importance of terrestrial ecosystems to human well-being and supporting services, decision makers throughout the world are busy creating policy responses that secure multiple development and conservation objectives- including that of supporting terrestrial ecosystem resilience in the context of climate change. This article aims to advance analyses on climate policy evaluation and planning in the area of terrestrial ecosystem resilience by discussing adaptation policy options within the ecology-economy-social nexus. The paper evaluates these decisions in the realm of terrestrial ecosystem resilience and evaluates the utility of a set of criteria, indicators, and assessment methods, proposed by a new conceptual multi-criteria framework for pro-development climate policy and planning developed by the United Nations Environment Programme. Potential applications of a multicriteria approach to climate policy vis-A -vis terrestrial ecosystems are then explored through two hypothetical case study examples. The paper closes with a brief discussion of the utility of the multi-criteria approach in the context of other climate policy evaluation approaches, considers lessons learned as a result efforts to evaluate climate policy in the realm of terrestrial ecosystems, and reiterates the role of ecosystem resilience in creating sound policies and actions that support the integration of climate change and development goals.

  10. GARCH Option Pricinga Options can be priced when the underlying asset's

    E-Print Network [OSTI]

    Lyuu, Yuh-Dauh

    GARCH Option Pricinga · Options can be priced when the underlying asset's return follows a GARCH for any elapsed time t. aA Bloomberg quant said, on Feb 29, 2008, that GARCH option pricing is seldom used in trading. c 2008 Prof. Yuh-Dauh Lyuu, National Taiwan University Page 686 #12;GARCH Option Pricing

  11. Hydrogen Delivery InfrastructureHydrogen Delivery Infrastructure Option AnalysisOption Analysis

    E-Print Network [OSTI]

    Converting NG/oil pipelines for GH delivery Option 3 Blending GH into NG pipelines Option 4* GH tube trailers Option 5* LH tank trucks Option 6 Use of novel H2 carriers (alanate; chemical hydride; liquid hydrocarbon as CA) -- NG distribution lines: gas companies usually use for Class 3 & 4 No odorants used in current H

  12. 1992 Columbia River Salmon Flow Measures Options Analysis/EIS.

    SciTech Connect (OSTI)

    Not Available

    1992-01-01T23:59:59.000Z

    This Options Analysis/Environmental Impact Statement (OA/EIS) identifies, presents effects of, and evaluates the potential options for changing instream flow levels in efforts to increase salmon populations in the lower Columbia and Snake rivers. The potential actions would be implemented during 1992 to benefit juvenile and adult salmon during migration through eight run-of-river reservoirs. The Corps of Engineers (Corps) prepared this document in cooperation with the Bonneville Power Administration and the Bureau of Reclamation. The US Fish and Wildlife Service (FSWS) is a participating agency. The text and appendices of the document describe the characteristics of 10 Federal projects and one private water development project in the Columbia River drainage basin. Present and potential operation of these projects and their effects on the salmon that spawn and rear in the Columbia and Snake River System are presented. The life history, status, and response of Pacific salmon to current environmental conditions are described.

  13. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    -first Century, Hyderabad, India, February 1999. Department of Civil EngineeringandMechanics College) of foundry by-products, including foundry sand and slag. Most of these by-products are landfilled, primarily due to non-availability of economically attractive use options. Landfilling is not a desirable option

  14. Document Supply Services Quick Guide

    E-Print Network [OSTI]

    , phrase, ISBN/ISSN in the Search Term field (other options are available in the dropdown menu). Note1 Document Supply Services Quick Guide The DSS Portal makes requesting easy! Search for your item and password. If you are having difficulty please read the login help on the main DSS webpage. 2. Enter a word

  15. A case study review of technical and technology issues for transition of a utility load management program to provide system reliability resources in restructured electricity markets

    SciTech Connect (OSTI)

    Weller, G.H.

    2001-07-15T23:59:59.000Z

    Utility load management programs--including direct load control and interruptible load programs--were employed by utilities in the past as system reliability resources. With electricity industry restructuring, the context for these programs has changed; the market that was once controlled by vertically integrated utilities has become competitive, raising the question: can existing load management programs be modified so that they can effectively participate in competitive energy markets? In the short run, modified and/or improved operation of load management programs may be the most effective form of demand-side response available to the electricity system today. However, in light of recent technological advances in metering, communication, and load control, utility load management programs must be carefully reviewed in order to determine appropriate investments to support this transition. This report investigates the feasibility of and options for modifying an existing utility load management system so that it might provide reliability services (i.e. ancillary services) in the competitive markets that have resulted from electricity industry restructuring. The report is a case study of Southern California Edison's (SCE) load management programs. SCE was chosen because it operates one of the largest load management programs in the country and it operates them within a competitive wholesale electricity market. The report describes a wide range of existing and soon-to-be-available communication, control, and metering technologies that could be used to facilitate the evolution of SCE's load management programs and systems to provision of reliability services. The fundamental finding of this report is that, with modifications, SCE's load management infrastructure could be transitioned to provide critical ancillary services in competitive electricity markets, employing currently or soon-to-be available load control technologies.

  16. Utility-Customer Rate Negotiations Blackmail or Compromise?

    E-Print Network [OSTI]

    Gilbert, J. S.

    Ion is cogeneration, where the fuel supplier can increase market share at the expense of the electric utility. There are also absorption chillers that do the same. And there are electric options that go after a fuel supplier's loads. These include heat pumps..., microwave, radIo frequency, infrared and others. There are load shaping options to reduce the cost of purchased commodities. The most obvious of these is cold water or ice based thermal storage. In these cases, the electric utility usually will have a...

  17. Study on effects of resident-perceived neighborhood boundaries on public services accessibility & its relation to utilization: using Geographic Information System, focusing on the case of public parks in Austin, Texas

    E-Print Network [OSTI]

    Cho, Chun Man

    2004-09-30T23:59:59.000Z

    parks based on equity consideration and its relationship to park utilization. The study also addressed whether the neighborhood boundaries perceived by the actual residents may exhibit more actual neighborhood construct than Census-based Neighborhood...

  18. Intergovernmental Solid Waste Services (Iowa)

    Broader source: Energy.gov [DOE]

    Two or more local governments may form a public service monopoly, utilizing private recycling industries where possible, if such a monopoly is deemed necessary to protect public health and welfare...

  19. Minimum Gas Service Standards (Ohio)

    Broader source: Energy.gov [DOE]

    Natural gas companies in Ohio are required to follow the Minimum Gas Service Standards, which are set and enforced by the Public Utilities Commission of Ohio. These rules are found in chapter 4901...

  20. Student Services Student Services

    E-Print Network [OSTI]

    Student Services _______________ 1.9 Page 1 Student Services DIVISION OF STUDENT AFFAIRS Office for Student Affairs The Division of Student Affairs seeks to create a campus environment that fully engages students in the integration of their academic and personal development through quality programs

  1. Student Services Student Services

    E-Print Network [OSTI]

    Collett Jr., Jeffrey L.

    Student Services Student Services DIVISION OF STUDENT AFFAIRS Office in the Administration Building, Room 201 (970) 491-5312 studentaffairs.colostate.edu Blanche Hughes, Vice President for Student Affairs The Division of Student Affairs seeks to create a campus environment that fully engages students

  2. Utility battery storage systems. Program report for FY95

    SciTech Connect (OSTI)

    Butler, P.C.

    1996-03-01T23:59:59.000Z

    Sandia National Laboratories, New Mexico, conducts the Utility Battery Storage Systems Program, which is sponsored by the U.S. Department of Energy`s Office of Utility Technologies. The goal of this program is to assist industry in developing cost-effective battery systems as a utility resource option by 2000. Sandia is responsible for the engineering analyses, contracted development, and testing of rechargeable batteries and systems for utility energy storage applications. This report details the technical achievements realized during fiscal year 1995.

  3. Bioenergy in India: Barriers and Policy Options | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin: Energy ResourcesJersey:form View source HistoryBarriers and Policy Options Jump

  4. Exit Options and Dividend Policy under Liquidity Constraints

    E-Print Network [OSTI]

    Murto, Pauli; Terviö, Marko

    2009-01-01T23:59:59.000Z

    optimal exercise of real options. Boyle and Guthrie (2003)described by the standard real option model of optimal exit.

  5. Scheduling for Quality of Service based Service Di erentiation Saswati Sarkar 1 and Leandros Tassiulas 2

    E-Print Network [OSTI]

    Sarkar, Saswati

    Scheduling for Quality of Service based Service Di#11;erentiation Saswati Sarkar 1 and Leandros, College Park, leandros@isr.umd.edu #3; Address all correspondence to Saswati Sarkar We consider a utility

  6. A Case Study of Danville Utilities: Utilizing Industrial Assessment...

    Broader source: Energy.gov (indexed) [DOE]

    A Case Study of Danville Utilities: Utilizing Industrial Assessment Centers to Provide Energy Efficiency Resources for Key Accounts A Case Study of Danville Utilities: Utilizing...

  7. How One Utility is Building Industrial Consumer Relationships

    E-Print Network [OSTI]

    Hamilton, D. E.

    HOW ONE UT1~ITY IS BUILDING INDUSTRIAL CONSUMER RELATIONSHIPS DONALD E. HAMILTON Manager-Industrial Services and Cogeneration Gulf States Utilities Company Beaumont, Texas COMPETITION AND THE UTILITY INDUSTRY The refining and petrochemical... industries enjoyed an unprecedented era of growth beginning with World War II and continuing through the seventies. Electric loads served by gulf coast utilities grew at phenomenal rates. Electric loads at Gulf States Utilities, my Company, grew at a...

  8. Service-Oriented Heterogeneous Resource Sharing for Optimizing Service Latency in Mobile Cloud

    E-Print Network [OSTI]

    Mandayam, Narayan

    Service-Oriented Heterogeneous Resource Sharing for Optimizing Service Latency in Mobile Cloud for mobile cloud applications and services. In this paper, we propose an architecture and mathematical frame- work for heterogeneous resource sharing based on the key idea of service-oriented utility functions

  9. VAMOS: The verification and monitoring options study: Current research options for in-situ monitoring and verification of contaminant remediation and containment within the vadose zone

    SciTech Connect (OSTI)

    Betsill, J.D. [Sandia National Labs., Albuquerque, NM (United States); Gruebel, R.D. [Tech Reps., Inc., Albuquerque, NM (United States)

    1995-09-01T23:59:59.000Z

    The Verification and Monitoring Options Study Project (VAMOS) was established to identify high-priority options for future vadose-zone environmental research in the areas of in-situ remediation monitoring, post-closure monitoring, and containment emplacement and verification monitoring. VAMOS examined projected needs not currently being met with applied technology in order to develop viable monitoring and verification research options. The study emphasized a compatible systems approach to reinforce the need for utilizing compatible components to provide user friendly site monitoring systems. To identify the needs and research options related to vadose-zone environmental monitoring and verification, a literature search and expert panel forums were conducted. The search included present drivers for environmental monitoring technology, technology applications, and research efforts. The forums included scientific, academic, industry, and regulatory environmental professionals as well as end users of environmental technology. The experts evaluated current and future monitoring and verification needs, methods for meeting these needs, and viable research options and directions. A variety of high-priority technology development, user facility, and technology guidance research options were developed and presented as an outcome of the literature search and expert panel forums.

  10. DOE outlines complex cleanup options

    SciTech Connect (OSTI)

    Lobsenz, G.

    1994-02-25T23:59:59.000Z

    The Energy Department said last week it will consider four different strategies for cleanup of its nuclear weapons complex in a draft programmatic environmental impact statement due for release this summer. In an implementation plan released for public comment February 17, DOE also said the EIS would look at centralized, decentralized and regional approaches to management of six types of radioactive and hazardous wastes. Other issues to be addressed in the EIS are development of innovative cleanup technology, budgeting and prioritization, job cutbacks and worker retraining, waste minimization and community involvement in cleanup decisions. However, DOE said it had decided not to address spent nuclear fuel storage in the EIS, as had been previously planned. Instead, spent fuel storage options will be reviewed in another environmental study being done under court order for DOE's Idaho National Engineering Laboratory. Findings from the INEL study will be incorporated in the department-wide EIS for environmental restoration and waste management.

  11. Utilization of waste heat stream in distillation

    SciTech Connect (OSTI)

    Fidkowski, Z.T.; Agrawal, R. [Air Products and Chemicals, Inc., Allentown, PA (United States)

    1995-04-01T23:59:59.000Z

    Cost of separation can be reduced by utilizing all available energy streams at various temperature levels. In the simplest case a waste energy heat stream can be used to partially vaporize a liquid feed stream. A more beneficial process involves an entire evaporation of a portion of the feed and introducing it into a column below the liquid portion of the feed. One can also use the waste energy stream as a heating medium in an intermediate reboiler in the column. There is, however, a limit to the amount of the waste energy that can be utilized in each case, beyond which this approach is no longer beneficial. Detailed analysis of the waste heat utilization enables one to determine this limit and compare each of these flowsheet options.

  12. Fast 3D Brain Segmentation Using Dual-Front Active Contours with Optional User-Interaction

    E-Print Network [OSTI]

    Cohen, Laurent

    Fast 3D Brain Segmentation Using Dual-Front Active Contours with Optional User-Interaction Hua Li1 attributes of 3D brain segmentation algorithms in- clude robustness, accuracy, computational efficiency result. We propose a novel 3D brain cortex segmentation procedure utilizing dual- front active contours

  13. ASSESSMENT OF OPTIONS FOR ATTRACTIVE COMMERCIAL AND DEMONSTRATION TOKAMAK FUSION POWER PLANTS

    E-Print Network [OSTI]

    California at San Diego, University of

    ASSESSMENT OF OPTIONS FOR ATTRACTIVE COMMERCIAL AND DEMONSTRATION TOKAMAK FUSION POWER PLANTS Power Plant based on toka- mak confinement concept. It is obvious that the Fusion Demo should demonstrate that a commercial fusion power plant would be accepted by utility and industry (i

  14. OFF-GRID RENEWABLE ENERGY OPTIONS FOR RURAL ELECTRIFICATION IN WESTERN CHINA

    E-Print Network [OSTI]

    Delaware, University of

    OFF-GRID RENEWABLE ENERGY OPTIONS FOR RURAL ELECTRIFICATION IN WESTERN CHINA by the Center in the field of renewable energy utilization in rural areas. John Byrne Director, CEEP #12;iii TABLE..............................................................................................................2 1.4 Renewable Energy and Rural Electrification: A Conceptual Understanding............3 2. PROFILE

  15. Assuring Generation Adequacy through Call Option Obligations Shmuel S. Oren, Fellow IEEE

    E-Print Network [OSTI]

    Oren, Shmuel S.

    Assuring Generation Adequacy through Call Option Obligations Shmuel S. Oren, Fellow IEEE University-utility generators to bear investment and operating risks, and by requiring retailers and/or their customers to bear energy market, generators always offer supply at marginal cost but inframarginal profits (from scarcity

  16. Utility Solar Generation Valuation Methods

    SciTech Connect (OSTI)

    Hansen, Thomas N.; Dion, Phillip J.

    2009-06-30T23:59:59.000Z

    Tucson Electric Power (TEP) developed, tested and verified the results of a new and appropriate method for accurately evaluating the capacity credit of time variant solar generating sources and reviewed new methods to appropriately and fairly evaluate the value of solar generation to electric utilities. The project also reviewed general integrated approaches for adequately compensating owners of solar generation for their benefits to utilities. However, given the limited funding support and time duration of this project combined with the significant differences between utilities regarding rate structures, solar resource availability and coincidence of solar generation with peak load periods, it is well beyond the scope of this project to develop specific rate, rebate, and interconnection approaches to capture utility benefits for all possible utilities. The project developed computer software based evaluation method models to compare solar generation production data measured in very short term time increments called Sample Intervals over a typical utility Dispatch Cycle during an Evaluation Period against utility system load data. Ten second resolution generation production data from the SGSSS and actual one minute resolution TEP system load data for 2006 and 2007, along with data from the Pennington Street Garage 60 kW DC capacity solar unit installed in downtown Tucson will be applied to the model for testing and verification of the evaluation method. Data was provided by other utilities, but critical time periods of data were missing making results derived from that data inaccurate. The algorithms are based on previous analysis and review of specific 2005 and 2006 SGSSS production data. The model was built, tested and verified by in house TEP personnel. For this phase of the project, TEP communicated with, shared solar production data with and collaborated on the development of solar generation valuation tools with other utilities, including Arizona Public Service, Salt River Project, Xcel and Nevada Power Company as well as the Arizona electric cooperatives. In the second phase of the project, three years of 10 second power output data of the SGSSS was used to evaluate the effectiveness of frequency domain analysis, normal statistical distribution analysis and finally maximum/minimum differential output analysis to test the applicability of these mathematic methods in accurately modeling the output variations produced by clouds passing over the SGSSS array.

  17. Power Sales to Electric Utilities

    SciTech Connect (OSTI)

    None

    1989-02-01T23:59:59.000Z

    The Public Utilities Regulatory Policies Act (PURPA) of 1979 requires that electrical utilities interconnect with qualifying facilities and purchase electricity at a rate based upon their full avoided costs (i.e., costs of providing both capacity and energy). Qualifying facilities (QF) include solar or geothermal electric units, hydropower, municipal solid waste or biomass-fired power plants, and cogeneration projects that satisfy maximum size, fuel use, ownership, location, and/or efficiency criteria. In Washington State, neither standard power purchase prices based upon a proxy ''avoided plant'', standard contracts, or a standard offer process have been used. Instead, a variety of power purchase contracts have been negotiated by developers of qualifying facilities with investor-owned utilities, public utility districts, and municipally-owned and operated utilities. With a hydro-based system, benefits associated with resource acquisition are determined in large part by how compatible the resource is with a utility's existing generation mix. Power purchase rates are negotiated and vary according to firm energy production, guarantees, ability to schedule maintenance or downtime, rights of refusal, power plant purchase options, project start date and length of contract; front-loading or levelization provisions; and the ability of the project to provide ''demonstrated'' capacity. Legislation was also enacted which allows PURPA to work effectively. Initial laws established ownership rights and provided irrigation districts, PUDs, and municipalities with expanded enabling powers. Financial processes were streamlined and, in some cases, simplified. Finally, laws were passed which are designed to ensure that development proceeds in an environmentally acceptable manner. In retrospect, PURPA has worked well within Washington. In the state of Washington, 20 small-scale hydroelectric projects with a combined generating capacity of 77 MW, 3 solid waste-to-energy facilities with 55 MW of electrical output, 4 cogeneration projects with 34.5 MW of generating capability, and 4 wastewater treatment facility digester gas-to-energy projects with 5 MW of electrical production have come on-line (or are in the final stages of construction) since the passage of PURPA. These numbers represent only a small portion of Washington's untapped and underutilized cogeneration and renewable resource generating potentials. [DJE-2005

  18. Optional Residential Program Benchmarking | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Data and Evaluation Peer Exchange Call Series: Optional Residential Program Benchmarking, Call Slides and Discussion Summary, January 23, 2014. Call Slides and Discussion Summary...

  19. Biochemistry, Research Option BS Degree Completion Checklist

    E-Print Network [OSTI]

    Sherrill, David

    ____ CHEM 4601 ____ Biology Electives: 9 hours 4701 _____ LCC 4702 _____ Free Electives: ____ hours petition. Note on CHEM 4698 vs. 4699 CHEM 4698 does count toward the Research Option designation

  20. UBC Social Ecological Economic Development Studies (SEEDS) Student Report An Investigation into Sustainable Transport Options

    E-Print Network [OSTI]

    investigated: using a car co-op's services, purchasing a diesel engine vehicle, and purchasing a diesel vehicle of traveling off campus to find and retrieve a vehicle out ways the potential cost savings and the ability options. UBC Farm needs to replace its aging gasoline operated farm and delivery vehicle. The UBC Farm

  1. Hedging Quantity Risks with Standard Power Options in a Competitive Wholesale Electricity

    E-Print Network [OSTI]

    Hedging Quantity Risks with Standard Power Options in a Competitive Wholesale Electricity Market, GA, 30332-0205 USA March 3, 2005 Abstract This paper addresses quantity risk in the electricity of a load serving entity, which provides electricity service at a regulated price in electricity markets

  2. Hedging Quantity Risks with Standard Power Options in a Competitive Wholesale Electricity Market

    E-Print Network [OSTI]

    Oren, Shmuel S.

    Hedging Quantity Risks with Standard Power Options in a Competitive Wholesale Electricity MarketScience (www.interscience.wiley.com). Abstract: This paper addresses quantity risk in the electricity market-serving entity, which provides electricity service at a regulated price in electricity markets with price

  3. Life cycle assessment of base-load heat sources for district heating system options

    SciTech Connect (OSTI)

    Ghafghazi, Saeed [University of British Columbia, Vancouver; Sowlati, T. [University of British Columbia, Vancouver; Sokhansanj, Shahabaddine [ORNL; Melin, Staffan [Delta Research Corporation

    2011-03-01T23:59:59.000Z

    Purpose There has been an increased interest in utilizing renewable energy sources in district heating systems. District heating systems are centralized systems that provide heat for residential and commercial buildings in a community. While various renewable and conventional energy sources can be used in such systems, many stakeholders are interested in choosing the feasible option with the least environmental impacts. This paper evaluates and compares environmental burdens of alternative energy source options for the base load of a district heating center in Vancouver, British Columbia (BC) using the life cycle assessment method. The considered energy sources include natural gas, wood pellet, sewer heat, and ground heat. Methods The life cycle stages considered in the LCA model cover all stages from fuel production, fuel transmission/transportation, construction, operation, and finally demolition of the district heating system. The impact categories were analyzed based on the IMPACT 2002+ method. Results and discussion On a life-cycle basis, the global warming effect of renewable energy options were at least 200 kgeqCO2 less than that of the natural gas option per MWh of heat produced by the base load system. It was concluded that less than 25% of the upstream global warming impact associated with the wood pellet energy source option was due to transportation activities and about 50% of that was resulted from wood pellet production processes. In comparison with other energy options, the wood pellets option has higher impacts on respiratory of inorganics, terrestrial ecotoxicity, acidification, and nutrification categories. Among renewable options, the global warming impact of heat pump options in the studied case in Vancouver, BC, were lower than the wood pellet option due to BC's low carbon electricity generation profile. Ozone layer depletion and mineral extraction were the highest for the heat pump options due to extensive construction required for these options. Conclusions Natural gas utilization as the primary heat source for district heat production implies environmental complications beyond just the global warming impacts. Diffusing renewable energy sources for generating the base load district heat would reduce human toxicity, ecosystem quality degradation, global warming, and resource depletion compared to the case of natural gas. Reducing fossil fuel dependency in various stages of wood pellet production can remarkably reduce the upstream global warming impact of using wood pellets for district heat generation.

  4. Utility Conservation Programs: A Regulatory and Design Framework

    E-Print Network [OSTI]

    Norland, D. L.; Wolf, J. L.

    , it provides that a conservation program may be implemented as long as the utility's revenue requirements (the total costs to the utility of providing electric services) do not rise over what they would have been in the absence of a utility conservation... is to achieve the greatest reduction in revenue requirements (to provide electric services at least cost to society), a utility would never pay an incentive for an in dividual ECO greater than the marginal cost it saves. If it offered incentives greater...

  5. Model Predictive Control of Regulation Services from Commercial Buildings to the Smart Grid

    E-Print Network [OSTI]

    Maasoumy, Mehdi

    2014-01-01T23:59:59.000Z

    Services from Commercial Buildings to the Smart Grid Mehdicommercial building hvac fan as ancillary service for smartbuildings flexibility can be utilized for frequency regulation provision in the smart

  6. Model-based Estimation of Flexibility and Optionability in an Integrated Real Options Framework

    E-Print Network [OSTI]

    Mikaelian, Tsoline

    Uncertainties can be managed through real options that provide a decision maker the right, but not the obligation, to exercise actions at a later time. In previous work we introduced an integrated real options framework ...

  7. Real options "in" projects and systems design : identification of options and solutions for path dependency

    E-Print Network [OSTI]

    Wang, Tao, 1973-

    2005-01-01T23:59:59.000Z

    This research develops a comprehensive approach to identify and deal with real options in" projects, that is, those real options (flexibility) that are integral parts of the technical design. It represents a first attempt ...

  8. Pueblo of Laguna Utility Authority Renewable Energy Feasibility Study

    SciTech Connect (OSTI)

    Carolyn Stewart, Red Mountain Tribal Energy

    2008-03-31T23:59:59.000Z

    The project, “Renewable Energy Feasibility Study” was designed to expand upon previous work done by the Tribe in evaluating utility formation, generation development opportunities, examining options for creating self-sufficiency in energy matters, and integrating energy management with the Tribe’s economic development goals. The evaluation of project locations and economic analysis, led to a focus primarily on solar projects.

  9. The Utility of Pollination for Autonomic Computing

    E-Print Network [OSTI]

    Bauer, Bernhard

    transporting fresh meals and drinks, service cars taking cabin crews to their aircrafts, or fueling vehiclesThe Utility of Pollination for Autonomic Computing Holger Kasinger and Bernhard Bauer University disturbances, e. g. absent ground vehicles, accidents on the apron, delayed or different typed aircrafts

  10. Life cycle assessment of bagasse waste management options

    SciTech Connect (OSTI)

    Kiatkittipong, Worapon [Department of Chemical Engineering, Faculty of Engineering and Industrial Technology, Silpakorn University, Nakhon Pathom 73000 (Thailand); National Center of Excellence for Environmental and Hazardous Waste Management, Chulalongkorn University, Bangkok 10330 (Thailand); Wongsuchoto, Porntip [National Center of Excellence for Environmental and Hazardous Waste Management, Chulalongkorn University, Bangkok 10330 (Thailand); Pavasant, Prasert [National Center of Excellence for Environmental and Hazardous Waste Management, Chulalongkorn University, Bangkok 10330 (Thailand); Department of Chemical Engineering, Faculty of Engineering, Chulalongkorn University, Bangkok 10330 (Thailand)], E-mail: prasert.p@chula.ac.th

    2009-05-15T23:59:59.000Z

    Bagasse is mostly utilized for steam and power production for domestic sugar mills. There have been a number of alternatives that could well be applied to manage bagasse, such as pulp production, conversion to biogas and electricity production. The selection of proper alternatives depends significantly on the appropriateness of the technology both from the technical and the environmental points of view. This work proposes a simple model based on the application of life cycle assessment (LCA) to evaluate the environmental impacts of various alternatives for dealing with bagasse waste. The environmental aspects of concern included global warming potential, acidification potential, eutrophication potential and photochemical oxidant creation. Four waste management scenarios for bagasse were evaluated: landfilling with utilization of landfill gas, anaerobic digestion with biogas production, incineration for power generation, and pulp production. In landfills, environmental impacts depended significantly on the biogas collection efficiency, whereas incineration of bagasse to electricity in the power plant showed better environmental performance than that of conventional low biogas collection efficiency landfills. Anaerobic digestion of bagasse in a control biogas reactor was superior to the other two energy generation options in all environmental aspects. Although the use of bagasse in pulp mills created relatively high environmental burdens, the results from the LCA revealed that other stages of the life cycle produced relatively small impacts and that this option might be the most environmentally benign alternative.

  11. architecture 2-year master of architecture option deadlinesmaster of architecture 3-year master of architecture option

    E-Print Network [OSTI]

    Papalambros, Panos

    credits) 1 environmental technology course (3 credits) 2 architectural history courses (6 credits) 3master of architecture (M.Arch.) #12;2-year master of architecture option deadlinesmaster of architecture 3-year master of architecture option Taubman College's 2-year master of architecture option

  12. On Accurate Trinomial GARCH Option Pricing

    E-Print Network [OSTI]

    Lyuu, Yuh-Dauh

    On Accurate Trinomial GARCH Option Pricing Algorithms Advisor: Prof. Yuh-Dauh Lyuu Chun-Yang Liu Department of Computer Science and Information Engineering National Taiwan University #12;Abstract The GARCH-based GARCH option pricing algorithms suffer from exponential running time, inaccuracy, or other problems

  13. Montana State University 1 Geology Option

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    Montana State University 1 Geology Option The Geology Option is a degree program designed and private sectors in fields such as petroleum geology, mining geology, seismology (including earthquake and volcanic risk assessment), hydrology (surface and ground water) natural-hazard geology, environmental clean

  14. Avista Utilities- Net Metering

    Broader source: Energy.gov [DOE]

    Idaho does not have a statewide net-metering policy. However, each of the state's three investor-owned utilities -- Avista Utilities, Idaho Power and Rocky Mountain Power -- has developed a net...

  15. Mississippi Public Utility Act

    Broader source: Energy.gov [DOE]

    The Mississippi Public Utility Act is relevant to any project that plans to generate energy. It requires that a utility must first obtain a Certificate of Public Convenience and Necessity (CPCN)...

  16. GSA- Utility Interconnection Agreements

    Broader source: Energy.gov [DOE]

    Presentation given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

  17. Low-income energy policy in a restructuring electricity industry: an assessment of federal options

    SciTech Connect (OSTI)

    Baxter, L.W.

    1997-07-01T23:59:59.000Z

    This report identifies both the low-income energy services historically provided in the electricity industry and those services that may be affected by industry restructuring. It identifies policies that are being proposed or could be developed to address low- income electricity services in a restructured industry. It discusses potential federal policy options and identifies key policy and implementation issues that arise when considering these potential federal initiatives. To understand recent policy development at the state level, we reviewed restructuring proposals from eight states and the accompanying testimony and comments filed in restructuring proceedings in these states.

  18. Impact of Large Scale Energy Efficiency Programs On Consumer Tariffs and Utility Finances in India

    SciTech Connect (OSTI)

    Abhyankar, Nikit; Phadke, Amol

    2011-01-20T23:59:59.000Z

    Large-scale EE programs would modestly increase tariffs but reduce consumers' electricity bills significantly. However, the primary benefit of EE programs is a significant reduction in power shortages, which might make these programs politically acceptable even if tariffs increase. To increase political support, utilities could pursue programs that would result in minimal tariff increases. This can be achieved in four ways: (a) focus only on low-cost programs (such as replacing electric water heaters with gas water heaters); (b) sell power conserved through the EE program to the market at a price higher than the cost of peak power purchase; (c) focus on programs where a partial utility subsidy of incremental capital cost might work and (d) increase the number of participant consumers by offering a basket of EE programs to fit all consumer subcategories and tariff tiers. Large scale EE programs can result in consistently negative cash flows and significantly erode the utility's overall profitability. In case the utility is facing shortages, the cash flow is very sensitive to the marginal tariff of the unmet demand. This will have an important bearing on the choice of EE programs in Indian states where low-paying rural and agricultural consumers form the majority of the unmet demand. These findings clearly call for a flexible, sustainable solution to the cash-flow management issue. One option is to include a mechanism like FAC in the utility incentive mechanism. Another sustainable solution might be to have the net program cost and revenue loss built into utility's revenue requirement and thus into consumer tariffs up front. However, the latter approach requires institutionalization of EE as a resource. The utility incentive mechanisms would be able to address the utility disincentive of forgone long-run return but have a minor impact on consumer benefits. Fundamentally, providing incentives for EE programs to make them comparable to supply-side investments is a way of moving the electricity sector toward a model focused on providing energy services rather than providing electricity.

  19. Transmission access: The new factor in electric utility mergers

    SciTech Connect (OSTI)

    Boiler, D.S.

    1991-04-01T23:59:59.000Z

    This article deals with the effect of consideration of transmission access in whether a merger of electric utility is in the public interest. Cases examined are Southern California Edison and San Diego Gas and Electric, Utah Power and Light and Pacific Power and Light, Public Service Company of New Hampshire and Northeast Utilities Service Company, Kansas Gas and Electric and Kansas Power and Light, plus some holding company mergers.

  20. Impact of information and communications technologies on residental customer energy services

    SciTech Connect (OSTI)

    Goldman, C.; Kempton, W.; Eide, A.; Iyer, M. [and others

    1996-10-01T23:59:59.000Z

    This study analyzes the potential impact of information and communications technologies on utility delivery of residential customer energy services. Many utilities are conducting trials which test energy-related and non-energy services using advanced communications systems.

  1. Electric and gas utility marketing of residential energy conservation case studies

    SciTech Connect (OSTI)

    None

    1980-05-01T23:59:59.000Z

    The objective of this research was to obtain information about utility conservation marketing techniques from companies actively engaged in performing residential conservation services. Many utilities currently are offering comprehensive services (audits, listing of contractors and lenders, post-installation inspection, advertising, and performing consumer research). Activities are reported for the following utilities: Niagara Mohawk Power Corporation; Tampa Electric Company; Memphis Light, Gas, and Water Division; Northern States Power-Wisconsin; Public Service Company of Colorado; Arizona Public Service Company; Pacific Gas and Electric Company; Sacramento Municipal Utility District; and Pacific Power and Light Company.

  2. Wind Energy Applications for Municipal Water Services: Opportunities, Situation Analyses, and Case Studies; Preprint

    SciTech Connect (OSTI)

    Flowers, L.; Miner-Nordstrom, L.

    2006-01-01T23:59:59.000Z

    As communities grow, greater demands are placed on water supplies, wastewater services, and the electricity needed to power the growing water services infrastructure. Water is also a critical resource for thermoelectric power plants. Future population growth in the United States is therefore expected to heighten competition for water resources. Many parts of the United States with increasing water stresses also have significant wind energy resources. Wind power is the fastest-growing electric generation source in the United States and is decreasing in cost to be competitive with thermoelectric generation. Wind energy can offer communities in water-stressed areas the option of economically meeting increasing energy needs without increasing demands on valuable water resources. Wind energy can also provide targeted energy production to serve critical local water-system needs. The research presented in this report describes a systematic assessment of the potential for wind power to support water utility operation, with the objective to identify promising technical applications and water utility case study opportunities. The first section describes the current situation that municipal providers face with respect to energy and water. The second section describes the progress that wind technologies have made in recent years to become a cost-effective electricity source. The third section describes the analysis employed to assess potential for wind power in support of water service providers, as well as two case studies. The report concludes with results and recommendations.

  3. A Practical Approach to Modeling Managerial Risk Aversion in Real Option Valuation for Early Stage Investments ?

    E-Print Network [OSTI]

    Sebastian Jaimungal; Yuri Lawryshyn

    In this work, we build on a previous real options approach that utilizes managerial cash-flow estimates to value early stage project investments, but accounting for managerial risk aversion. We introduce a market sector indicator, which is assumed to be correlated to a tradeable market index, which, through a mapping function, drives and replicates the cash-flow estimates. The mapping allows us to link the cash-flow estimates to many theoretical real options frameworks which currently can not be applied in practice. Through indifference pricing we are able to model the effect of managerial risk aversion for any given set of cash-flow estimates.

  4. Power options for lunar exploration

    SciTech Connect (OSTI)

    Bamberger, J.A.; Gaustad, K.L.

    1992-01-01T23:59:59.000Z

    This paper presents an overview of the types of power systems available for providing power on the moon. Lunar missions of exploration, in situ resource utilization, and colonization will be constrained by availability of adequate power. The length of the lunar night places severe limitations on solar power system designs, because a large portion of the system mass is devoted to energy storage. The selection of the ideal power source hardware will require compatibility with not only the lunar base power requirements and environment, but also with the conversion, storage, and transmission equipment. In addition, further analysis to determine the optimum operating parameters for a given power system should be conducted so that critical technologies can be identified in the early stages of base development. This paper describes the various concepts proposed for providing power on the lunar surface and compare their ranges of applicability. The importance of a systems approach to the integration of these components will also be discussed.

  5. "List of Covered Electric Utilities" under the Public Utility...

    Broader source: Energy.gov (indexed) [DOE]

    6 Revised "List of Covered Electric Utilities" under the Public Utility Regulatory Policies Act of 1978 (PURPA) - 2006 Revised Under Title I of the Public Utility Regulatory...

  6. The market potential for SMES in electric utility applications. Final report

    SciTech Connect (OSTI)

    Not Available

    1994-06-01T23:59:59.000Z

    Superconducting magnetic energy storage (SMES) is an emerging technology with features that are potentially attractive in electric utility applications. This study evaluates the potential for SMES technology in the generation, transmission, distribution, and use of electric energy; the time frame of the assessment is through the year 2030. Comparisons are made with other technology options, including both commercially available and advanced systems such as various peaking generation technologies, transmission stability improvement technologies, and power quality enhancement devices. The methodology used for this study focused on the needs of the market place, the capabilities of S and the characteristics of the competing technologies. There is widespread interest within utilities for the development of SMES technology, but there is no general consensus regarding the most attractive size. Considerable uncertainty exists regarding the eventual costs and benefits of commercial SMES systems, but general trends have been developed based on current industry knowledge. Results of this analysis indicate that as storage capacity increases, cost increases at a rate faster than benefits. Transmission system applications requiring dynamic storage appear to have the most attractive economics. Customer service applications may be economic in the near term, but improved ride-through capability of end-use equipment may limit the size of this market over time. Other applications requiring greater storage capacity appear to be only marginally economic at best.

  7. Rolling Up a Put Option as Prices Increase

    E-Print Network [OSTI]

    Johnson, Jason; Polk, Wade

    2008-10-07T23:59:59.000Z

    Agricultural producers use put options to protect themselves against declining prices. The technique of "rolling up a put option, explained in this publication, allows the producer to raise the minimum expected selling price of a put option...

  8. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    in a combination with a number of fuels including coal, petroleum coke, natural gas, etc. In the mid 1990s, the unit was firing a combination of coal and petroleum coke to generate energy. It has been established;1 PROJECT 1 - COAL COMBUSTION BY-PRODUCTS: CHARACTERIZATION AND USE OPTIONS Introduction An AFBC system

  9. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    ash or CFAs. Based on these properties, a number of constructive use options such as #12;pollution by saw mills, pulp mills, and the wood-products industry, by burning a combination of wood products control [3], land application [9,10,11], construction materials [13,14], have been reported. However, most

  10. Local Option Municipal Economic Development Act (Nebraska)

    Broader source: Energy.gov [DOE]

    This act gives local governments the option to provide direct and indirect assistance to business enterprises in their communities, whether for expansion of existing operations, the creation of new...

  11. Comparison of Current LCD Tracking Options

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    Comparison of Current LCD Tracking Options Bruce Schumm Santa Cruz Institute for Particle Physics for new S design (pattern recognition, resolution) S detector in real trouble at low angle w/out beam

  12. Comparison of Current LCD Tracking Options

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    Comparison of Current LCD Tracking Options Bruce Schumm Santa Cruz Institute for Particle Physics tracking somewhat more pressed for new S design (pattern recognition, ` resolution) S detector in real

  13. Hedging Milk with BFP Futures and Options

    E-Print Network [OSTI]

    Anderson, David P.; McCorkle, Dean; Schwart Jr., Robert B.; Jones, Rodney

    1999-06-23T23:59:59.000Z

    Basic Formula Price (BFP) milk futures and options can be used to hedge, or lock in, milk prices in order to manage milk price fluctuations. This publication offers information on futures contracts, basis, cash settlement and margin call. There also...

  14. Generalized utility metrics for supercomputers

    E-Print Network [OSTI]

    Strohmaier, Erich

    2009-01-01T23:59:59.000Z

    2007:1–12 Generalized utility metrics for supercomputers 12.ISSUE PAPER Generalized utility metrics for supercomputersproblem of ranking the utility of supercom- puter systems

  15. Joint Electrical Utilities (Iowa)

    Broader source: Energy.gov [DOE]

    Cities may establish utilities to acquire existing electric generating facilities or distribution systems. Acquisition, in this statute, is defined as city involvement, and includes purchase, lease...

  16. Utility Regulation (Indiana)

    Broader source: Energy.gov [DOE]

    The Indiana Utility Regulatory Commission enforces regulations in this legislation that apply to all individuals, corporations, companies, and partnerships that may own, operate, manage, or control...

  17. Electric Utility Industry Update

    Broader source: Energy.gov [DOE]

    Presentation—given at the April 2012 Federal Utility Partnership Working Group (FUPWG) meeting—covers significant electric industry trends and industry priorities with federal customers.

  18. Municipal Utility Districts (Texas)

    Broader source: Energy.gov [DOE]

    Municipal Utility Districts, regulated by the Texas Commission on Environmental Quality, may be created for the following purposes: (1) the control, storage, preservation, and distribution of its...

  19. Real Options for Project Schedules (ROPS)

    E-Print Network [OSTI]

    Ingber, Lester

    2007-01-01T23:59:59.000Z

    Real Options for Project Schedules (ROPS) has three recursive sampling/optimization shells. An outer Adaptive Simulated Annealing (ASA) optimization shell optimizes parameters of strategic Plans containing multiple Projects containing ordered Tasks. A middle shell samples probability distributions of durations of Tasks. An inner shell samples probability distributions of costs of Tasks. PATHTREE is used to develop options on schedules.. Algorithms used for Trading in Risk Dimensions (TRD) are applied to develop a relative risk analysis among projects.

  20. Photovoltaics for demand-side management utility markets: A utility/customer partnership approach

    SciTech Connect (OSTI)

    Byrne, J.; Letendre, S.; Govindarajalu, C.; Wang, Y.D. [Univ. of Delaware, Newark, DE (United States). Center for Energy and Environmental Policy; Nigro, R. [Delmarva Power and Light Co., Wilmington, DE (United States); Wallace, W. [National Renewable Energy Lab., Golden, CO (United States)

    1994-12-31T23:59:59.000Z

    Photovoltaic (PV) systems located at customer sites can be used to meet utility needs for demand-side management (DSM) applications. PV-DSM can also represent a high-value intermediate market for PV in the utility sector. Maximum value for PV in DSM applications can be achieved by incorporating a dispatching capability to PV systems (through the addition of storage). This enables utilities to evaluate PV systems as a peak-shaving technology. To date, peak-shaving has been the higher value DSM application for US utilities. This analysis of the value of dispatchable PV-DSM systems indicates that small-scale, customer-sited systems are approaching competitive cost levels in several regions of the US that have favorable load matching and peak demand pricing characteristics. This paper presents the results for PV-DSM systems located within the service territories of five case study utilities.

  1. Public Utilities Specialist

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Power Marketing, (J6200) Contracts and Energy Services 5555...

  2. Options for Control of Reactive Power by Distributed Photovoltaic Generators

    E-Print Network [OSTI]

    Petr Sulc; Konstantin Turitsyn; Scott Backhaus; Michael Chertkov

    2010-08-04T23:59:59.000Z

    High penetration levels of distributed photovoltaic(PV) generation on an electrical distribution circuit present several challenges and opportunities for distribution utilities. Rapidly varying irradiance conditions may cause voltage sags and swells that cannot be compensated by slowly responding utility equipment resulting in a degradation of power quality. Although not permitted under current standards for interconnection of distributed generation, fast-reacting, VAR-capable PV inverters may provide the necessary reactive power injection or consumption to maintain voltage regulation under difficult transient conditions. As side benefit, the control of reactive power injection at each PV inverter provides an opportunity and a new tool for distribution utilities to optimize the performance of distribution circuits, e.g. by minimizing thermal losses. We discuss and compare via simulation various design options for control systems to manage the reactive power generated by these inverters. An important design decision that weighs on the speed and quality of communication required is whether the control should be centralized or distributed (i.e. local). In general, we find that local control schemes are capable for maintaining voltage within acceptable bounds. We consider the benefits of choosing different local variables on which to control and how the control system can be continuously tuned between robust voltage control, suitable for daytime operation when circuit conditions can change rapidly, and loss minimization better suited for nighttime operation.

  3. Tool to Compare Solar Energy Program Financing Options | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information Resources Tool to Compare Solar Energy Program Financing Options Tool to Compare Solar Energy Program Financing Options This model is intended to be used for...

  4. Waste Heat Management Options for Improving Industrial Process...

    Broader source: Energy.gov (indexed) [DOE]

    of waste heat streams, and options for recovery including Combined Heat and Power. Waste Heat Management Options for Improving Industrial Process Heating Systems...

  5. Renewable Power Options for Electricity Generation on Kaua'i...

    Office of Environmental Management (EM)

    Renewable Power Options for Electricity Generation on Kaua'i: Economics and Performance Modeling Renewable Power Options for Electricity Generation on Kaua'i: Economics and...

  6. The University of Texas at Austin Administrative Services

    E-Print Network [OSTI]

    Texas at Austin, University of

    Management and Analysis, January 22, 2007. Office of the President Office of Internal Audits Office & School Relations Hogg Foundation for Mental Health Office of Community & School Relations University Travel Management Services Technology Resources for Employee & Campus Services Utilities & Energy

  7. Partners for Progress- A Utility Perspective

    E-Print Network [OSTI]

    Pierce, C. S.

    a cogeneration facility. Given a competitive cost and CPL's quality serVice these industriales are choosing cPt as thei~ primary power supplier. The estimated cost of power from a ~6MW cogeneration facility is 3.4 cents/KWH which is the same... as the cost of CPL power. CU9'1'OM!R U9PQND TO HI!! INTDRUP'l'~ !m? Since the Public Utility COmm19B1on or Texas approved our latest interruptible rates for large industriales (10 MW and above) the company has Bold over 200 MWa of this service. This has...

  8. Competitive Bidding Process for Electric Distribution Companies’ Procurement of Default and Back-up Electric Generation Services (Connecticut)

    Broader source: Energy.gov [DOE]

    Electric distribution companies shall utilize a competitive bidding process for electric generation services. The Department of Public Utility Control will be responsible for setting the criteria...

  9. Texas - PUC Substantive Rule 25.198 - Electric Service Providers...

    Open Energy Info (EERE)

    Access Comparable Transmission Service for Electric Utilities in the Electric Reliability Council of Texas Jump to: navigation, search OpenEI Reference LibraryAdd to library...

  10. Uility Energy Services Contract Data Collection Confidentiality Statement

    Broader source: Energy.gov [DOE]

    Confidentiality statement for information collected by the U.S. Department of Energy, Federal Energy Management Program, and Energetics Inc. in regard to utility energy services contracts.

  11. Gnie civil, option gestion et entrepreneuriat en ingnierie / Civil Engineering, Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie civil, option gestion et entrepreneuriat en ingénierie / Civil Engineering, Engineering, CVG4130 or CVG4148. Bien que les cotes de cours apparaissent dans les deux langues (anglais

  12. Understanding bus service reliability : a practical framework using AVL/APC data

    E-Print Network [OSTI]

    Cham, Laura Cecilia

    2006-01-01T23:59:59.000Z

    Service reliability on a transit system can have significant impacts on its provider and both existing and potential users. To passengers, unreliable service affects their perception of service quality and transit utility ...

  13. Diesel plant retrofitting options to enhance decentralized electricity supply in Indonesia

    SciTech Connect (OSTI)

    Baring-Gould, E.I.; Barley, C.D.; Drouilhet, S. [and others] [and others

    1997-09-01T23:59:59.000Z

    Over the last 20 years, the government of Indonesia has undertaken an extensive program to provide electricity to the population of that country. The electrification of rural areas has been partially achieved through the use of isolated diesel systems, which account for about 20% of the country`s generated electricity. Due to many factors related to inefficient power production with diesels, the National Renewable Energy Laboratory, in conjunction with PLN, the Indonesian national utility, Community Power Corporation, and Idaho Power Company, analyzed options for retrofitting existing diesel power systems. This study considered the use of different combinations of advanced diesel control, the addition of wind generators, photovoltaics and batteries to reduce the systems of overall cost and fuel consumption. This analysis resulted in a general methodology for retrofitting diesel power systems. This paper discusses five different retrofitting options to improve the performance of diesel power systems. The systems considered in the Indonesian analysis are cited as examples for the options discussed.

  14. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    clean coal technology, are not extensively utilized in the cast concrete masonry products (bricks both conventional and clean coal technologies. A clean coal ash is defined as the ash derived from SO2Center for By-Products Utilization USE OF CLASS F FLY ASH AND CLEAN-COAL ASH BLENDS FOR CAST

  15. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    combustion by-products #12;3 generated by using both conventional and clean-coal technologies. A clean-coal that obtained from clean-coal technology, are not utilized in cast-concrete masonry products (bricks, blocksCenter for By-Products Utilization RECENT ADVANCES IN RECYCLING CLEAN- COAL ASH By Tarun R. Naik

  16. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    Center for By-Products Utilization USE OF CLASS F FLY ASH AND CLEAN-COAL ASH BLENDS FOR CAST OF CLASS F FLYASHAND CLEAN-COAL ASHBLENDS FOR CAST CONCRETE PRODUCTS Authors: TarunR.Naik, Director, Center,Illinois Clean Coal Institute RudolphN.Kraus, Research Associate, UWM Center forBy-Products Utilization Shiw S

  17. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    Center for By-Products Utilization CLEAN COAL BY-PRODUCTS UTILIZATION IN ROADWAY, EMBANKMENTS-fueled plants, particularly use of eastern coals, has lead to the use of clean coal and using advanced sulfur dioxide control technologies. Figure 1 shows clean coal technology benefits(2) . In 1977, the concept

  18. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    -Milwaukee, P.O. Box 784, Milwaukee, WI 53201 d Project Manager, Illinois Clean Coal Institute * Director UWM products containing clean coal ash compared to conventional coal ash. Utilization of clean coal ash is much products that utilize clean coal ash. With increasing federal regulations on power plant emissions, finding

  19. Integrating Solar PV in Utility System Operations

    SciTech Connect (OSTI)

    Mills, A.; Botterud, A.; Wu, J.; Zhou, Z.; Hodge, B-M.; Heany, M.

    2013-10-31T23:59:59.000Z

    This study develops a systematic framework for estimating the increase in operating costs due to uncertainty and variability in renewable resources, uses the framework to quantify the integration costs associated with sub-hourly solar power variability and uncertainty, and shows how changes in system operations may affect these costs. Toward this end, we present a statistical method for estimating the required balancing reserves to maintain system reliability along with a model for commitment and dispatch of the portfolio of thermal and renewable resources at different stages of system operations. We estimate the costs of sub-hourly solar variability, short-term forecast errors, and day-ahead (DA) forecast errors as the difference in production costs between a case with “realistic” PV (i.e., subhourly solar variability and uncertainty are fully included in the modeling) and a case with “well behaved” PV (i.e., PV is assumed to have no sub-hourly variability and can be perfectly forecasted). In addition, we highlight current practices that allow utilities to compensate for the issues encountered at the sub-hourly time frame with increased levels of PV penetration. In this analysis we use the analytical framework to simulate utility operations with increasing deployment of PV in a case study of Arizona Public Service Company (APS), a utility in the southwestern United States. In our analysis, we focus on three processes that are important in understanding the management of PV variability and uncertainty in power system operations. First, we represent the decisions made the day before the operating day through a DA commitment model that relies on imperfect DA forecasts of load and wind as well as PV generation. Second, we represent the decisions made by schedulers in the operating day through hour-ahead (HA) scheduling. Peaking units can be committed or decommitted in the HA schedules and online units can be redispatched using forecasts that are improved relative to DA forecasts, but still imperfect. Finally, we represent decisions within the operating hour by schedulers and transmission system operators as real-time (RT) balancing. We simulate the DA and HA scheduling processes with a detailed unit-commitment (UC) and economic dispatch (ED) optimization model. This model creates a least-cost dispatch and commitment plan for the conventional generating units using forecasts and reserve requirements as inputs. We consider only the generation units and load of the utility in this analysis; we do not consider opportunities to trade power with neighboring utilities. We also do not consider provision of reserves from renewables or from demand-side options. We estimate dynamic reserve requirements in order to meet reliability requirements in the RT operations, considering the uncertainty and variability in load, solar PV, and wind resources. Balancing reserve requirements are based on the 2.5th and 97.5th percentile of 1-min deviations from the HA schedule in a previous year. We then simulate RT deployment of balancing reserves using a separate minute-by-minute simulation of deviations from the HA schedules in the operating year. In the simulations we assume that balancing reserves can be fully deployed in 10 min. The minute-by-minute deviations account for HA forecasting errors and the actual variability of the load, wind, and solar generation. Using these minute-by-minute deviations and deployment of balancing reserves, we evaluate the impact of PV on system reliability through the calculation of the standard reliability metric called Control Performance Standard 2 (CPS2). Broadly speaking, the CPS2 score measures the percentage of 10-min periods in which a balancing area is able to balance supply and demand within a specific threshold. Compliance with the North American Electric Reliability Corporation (NERC) reliability standards requires that the CPS2 score must exceed 90% (i.e., the balancing area must maintain adequate balance for 90% of the 10-min periods). The combination of representing DA forecast errors in the

  20. Library Service Models Self-Study Team April 18, 2012

    E-Print Network [OSTI]

    California at Berkeley, University of

    1 Library Service Models Self-Study Team Overviews April 18, 2012 Access to Collections;2 Library Service Models Self-Study Team - Overviews Below are overviews of the options that the Library Libraries and their collections have long been intertwined, with the size of one a key indicator

  1. Renewable Energies program (6 credit hour) Option A: 11

    E-Print Network [OSTI]

    Simaan, Nabil

    Renewable Energies program (6 credit hour) Option A: 11 Option B: The program is organized by t Spanish Institute and the Asso program on renewable energy will provide students with advanced knowledge. opportunities: option A- two renewable energies; option B include on-site visits to renewable energy generation

  2. Wireless Network Capacity Management: A Real Options Approach

    E-Print Network [OSTI]

    Forsyth, Peter A.

    capacity, market price of risk, investment timing option 1 Introduction Wireless networks are now regarded

  3. Hydrogen Production: Overview of Technology Options, January 2009

    Fuel Cell Technologies Publication and Product Library (EERE)

    Overview of technology options for hydrogen production, its challenges and research needs and next steps

  4. Energy Analysis and Energy Conservation Options for the Addition to Records Storage Building

    E-Print Network [OSTI]

    Farzad, M.; O'Neal, D. L.

    1986-01-01T23:59:59.000Z

    REPORT Submitted by Mohsen Farzad Dennis L. O'Neal Prepared For Energy Efficiency Division Texas Public Utility Commission Austin, Texas ABSTRACT The energy use and peak load requirements of the addition to Records Storage Building in Austin, Texas were... reflectivity and low overall heat transfer coefficient was used to study the reduction of glass conduction and glass solar loads. Other options which were studied included increasing the wall and roof insulation,- reducing the light level, temperature setback...

  5. Utility Access Questionnaire | Utility Access Questionnaire

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 South Place: Salt Lake City, Utah Zip: 84111Jump to:Access Questionnaire

  6. Remote information service access system based on a client-server-service model

    DOE Patents [OSTI]

    Konrad, Allan M. (P.O. Box 4023, Berkeley, CA 94704)

    1999-01-01T23:59:59.000Z

    A local host computing system, a remote host computing system as connected by a network, and service functionalities: a human interface service functionality, a starter service functionality, and a desired utility service functionality, and a Client-Server-Service (CSS) model is imposed on each service functionality. In one embodiment, this results in nine logical components and three physical components (a local host, a remote host, and an intervening network), where two of the logical components are integrated into one Remote Object Client component, and that Remote Object Client component and the other seven logical components are deployed among the local host and remote host in a manner which eases compatibility and upgrade problems, and provides an illusion to a user that a desired utility service supported on a remote host resides locally on the user's local host, thereby providing ease of use and minimal software maintenance for users of that remote service.

  7. Remote information service access system based on a client-server-service model

    DOE Patents [OSTI]

    Konrad, Allan M. (P.O. Box 4023, Berkeley, CA 94704)

    1997-01-01T23:59:59.000Z

    A local host computing system, a remote host computing system as connected by a network, and service functionalities: a human interface service functionality, a starter service functionality, and a desired utility service functionality, and a Client-Server-Service (CSS) model is imposed on each service functionality. In one embodiment, this results in nine logical components and three physical components (a local host, a remote host, and an intervening network), where two of the logical components are integrated into one Remote Object Client component, and that Remote Object Client component and the other seven logical components are deployed among the local host and remote host in a manner which eases compatibility and upgrade problems, and provides an illusion to a user that a desired utility service supported on a remote host resides locally on the user's local host, thereby providing ease of use and minimal software maintenance for users of that remote service.

  8. Remote information service access system based on a client-server-service model

    DOE Patents [OSTI]

    Konrad, Allan M. (P.O. Box 4023, Berkeley, CA 94704)

    1996-01-01T23:59:59.000Z

    A local host computing system, a remote host computing system as connected by a network, and service functionalities: a human interface service functionality, a starter service functionality, and a desired utility service functionality, and a Client-Server-Service (CSS) model is imposed on each service functionality. In one embodiment, this results in nine logical components and three physical components (a local host, a remote host, and an intervening network), where two of the logical components are integrated into one Remote Object Client component, and that Remote Object Client component and the other seven logical components are deployed among the local host and remote host in a manner which eases compatibility and upgrade problems, and provides an illusion to a user that a desired utility service supported on a remote host resides locally on the user's local host, thereby providing ease of use and minimal software maintenance for users of that remote service.

  9. Remote information service access system based on a client-server-service model

    DOE Patents [OSTI]

    Konrad, A.M.

    1996-08-06T23:59:59.000Z

    A local host computing system, a remote host computing system as connected by a network, and service functionalities: a human interface service functionality, a starter service functionality, and a desired utility service functionality, and a Client-Server-Service (CSS) model is imposed on each service functionality. In one embodiment, this results in nine logical components and three physical components (a local host, a remote host, and an intervening network), where two of the logical components are integrated into one Remote Object Client component, and that Remote Object Client component and the other seven logical components are deployed among the local host and remote host in a manner which eases compatibility and upgrade problems, and provides an illusion to a user that a desired utility service supported on a remote host resides locally on the user`s local host, thereby providing ease of use and minimal software maintenance for users of that remote service. 16 figs.

  10. Remote information service access system based on a client-server-service model

    DOE Patents [OSTI]

    Konrad, A.M.

    1997-12-09T23:59:59.000Z

    A local host computing system, a remote host computing system as connected by a network, and service functionalities: a human interface service functionality, a starter service functionality, and a desired utility service functionality, and a Client-Server-Service (CSS) model is imposed on each service functionality. In one embodiment, this results in nine logical components and three physical components (a local host, a remote host, and an intervening network), where two of the logical components are integrated into one Remote Object Client component, and that Remote Object Client component and the other seven logical components are deployed among the local host and remote host in a manner which eases compatibility and upgrade problems, and provides an illusion to a user that a desired utility service supported on a remote host resides locally on the user`s local host, thereby providing ease of use and minimal software maintenance for users of that remote service. 16 figs.

  11. A systems model and potential leverage points for base load electric generating options

    SciTech Connect (OSTI)

    Brownson, D.A.; Hanson, D.J.; Price, L.G.; Sebo, D.E.

    1993-09-01T23:59:59.000Z

    The mission and structure of electric utilities may change significantly to meet the challenges on the next several decades. In addition, providing electrical energy in an environmentally responsible manner will continue to be a major challenge. The methods of supplying electrical power may change dramatically in the future as utilities search for ways to improve the availability and reliability of electrical power systems. The role of large, base load generating capacity to supply the bulk of a utility`s electrical power is evolving, but it will continue to be important for many years to come. The objective of this study is to examine the systems structure of five base load capacity options available to a utility and identify areas where technological improvements could produce significant changes in their systems. These improvements would enhance the likelihood that these options would be selected for providing future electrical capacity. Technology improvements are identified and discussed, but it was beyond the scope of this work to develop strategies for specific Idaho National Engineering Laboratory involvement.

  12. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    International Conference onFly Ash Disposal and Utilization,onJanuary 20-22, 1998, New Delhi, India. COAL ASH and embankments, pavement and subbase courses, subgrade stabilizations, landfill cover, soil improvement, land

  13. Supervisory Public Utilities Specialist

    Broader source: Energy.gov [DOE]

    The incumbent of this position serves as a Supervisory Public Utilities Specialist in the Long Term Power Planning Group that is part of Power Servicess Generation Asset Management, Power &...

  14. Extraction Utility Design Specification

    Energy Savers [EERE]

    Extraction Utility Design Specification January 11, 2011 Document Version 1.9 1 Revision History Date Version Section and Titles Author Summary of Change January 15, 2010 1.0 All...

  15. Gas Utilities (New York)

    Broader source: Energy.gov [DOE]

    This chapter regulates natural gas utilities in the State of New York, and describes standards and procedures for gas meters and accessories, gas quality, line and main extensions, transmission and...

  16. Utility and Industrial Partnerships

    E-Print Network [OSTI]

    Sashihara, T. F.

    In the past decade, many external forces have shocked both utilities and their large industrial customers into seeking more effective ways of coping and surviving. One such way is to develop mutually beneficial partnerships optimizing the use...

  17. utilities.scm

    E-Print Network [OSTI]

    ;;; Some utility functions (define (negative-abs m) ;; m can be big, so we'll try to be nice here (if (abs_m m) ;; returns smallest p ...

  18. Public Utilities (Florida)

    Broader source: Energy.gov [DOE]

    Chapter 366 of the Florida Statutes governs the operation of public utilities, and includes a section pertaining to cogeneration and small power production (366.051). This section establishes the...

  19. Utility Metering- AGL Resources

    Broader source: Energy.gov [DOE]

    Presentation—given at the Spring 2013 Federal Utility Partnership Working Group (FUPWG) meeting—discusses AGL Resources metering, including interruptible rate customers, large users, and meeting federal metering goals.

  20. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    Center for By-Products Utilization DRAFT REPORT CARBON DIOXIDE SEQUESTRATION IN CEMENTITIOUS-MILWAUKEE #12;CARBON DIOXIDE SEQUESTRATION IN CEMENTITIOUS PRODUCTS Progress Report by Tarun R. Naik, Rakesh of Carbon Dioxide Sequestration Technologies

  1. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    -Products Utilization E-mail: ymchun@uwm.edu and F. D. Botha Project Manager, Illinois Clean Coal Institute 5776 Coal, University of Wisconsin-Milwaukee, Milwaukee, WI, USA. 4 Project Manager, Illinois Clean Coal Institute

  2. Utility Easements (Indiana)

    Broader source: Energy.gov [DOE]

    A permit is required from the Indiana Department of Natural Resources for the construction of a utility upon a state park, a state forest, a state game preserve, land acquired by the state and set...

  3. Gas Utilities (Maine)

    Broader source: Energy.gov [DOE]

    Rules regarding the production, sale, and transfer of manufactured gas will also apply to natural gas. This section regulates natural gas utilities that serve ten or more customers, more than one...

  4. Double Shell Tank (DST) Utilities Specification

    SciTech Connect (OSTI)

    SUSIENE, W.T.

    2000-04-27T23:59:59.000Z

    This specification establishes the performance requirements and provides the references to the requisite codes and standards to he applied during the design of the Double-Shell Tank (DST) Utilities Subsystems that support the first phase of waste feed delivery (WFD). The DST Utilities Subsystems provide electrical power, raw/potable water, and service/instrument air to the equipment and structures used to transfer low-activity waste (LAW) and high-level waste (HLW) to designated DST staging tanks. The DST Utilities Subsystems also support the equipment and structures used to deliver blended LAW and HLW feed from these staging tanks to the River Protection Project (RPP) Privatization Contractor facility where the waste will be immobilized. This specification is intended to be the basis for new projects/installations. This specification is not intended to retroactively affect previously established project design criteria without specific direction by the program.

  5. Utility theory front to back inferring utility from agents' choices

    E-Print Network [OSTI]

    Utility theory front to back ­ inferring utility from agents' choices A. M. G. Cox Dept to utility theory and consumption & investment problems. Instead of specifying an agent's utility function) and ask if it is possible to derive a utility function for which the observed behaviour is optimal. We

  6. Asymptotic utility-based pricing and hedging for exponential utility

    E-Print Network [OSTI]

    Kallsen, Jan

    Asymptotic utility-based pricing and hedging for exponential utility Jan Kallsen Christian deals with pricing and hedging based on utility indifference for exponential utility. We consider order approximation the utility indifference price and the corresponding hedge can be determined from

  7. Energy Conservation Options in Distillation Processes

    E-Print Network [OSTI]

    Harris, G. E.; Hearn, W. R.; Blythe, G. M.; Stuart, J. M.

    1980-01-01T23:59:59.000Z

    ~itroo.? ':!OD.e~tell.,..ot!.k1 .'k..,.-.ottNltlu'..,. II ""'I'JI ..... ~I_ """-.4008l1"OO I ~.z.,. 1 ,1'1 (-frl-.'....u_~ R.da at AC~Ofllftl\\,J'ftlit...." ? I 5 "'-tlnc&! Tt.,.. ? 21.' \\lip Gilil.In31 j TnyE.'tIc>Mcy .11.1'llo I ~~TI""'.'2.at... I There are many options available to the engi*eer seeking to reduce the energy requirements of a distil lation process. The technology for most of these I, options has been available for many years, but it has only recently become economically...

  8. Sequestration Options for the West Coast States

    SciTech Connect (OSTI)

    Larry Myer

    2006-04-30T23:59:59.000Z

    The West Coast Regional Carbon Sequestration Partnership (WESTCARB) is one of seven partnerships that have been established by the U.S. Department of Energy (DOE) to evaluate carbon capture and sequestration (CCS) technologies best suited for different regions of the country. The West Coast Region comprises Arizona, California, Nevada, Oregon, Washington, Alaska, and British Columbia. Led by the California Energy Commission, WESTCARB is a consortium of about 70 organizations, including state natural resource and environmental protection agencies; national laboratories and universities; private companies working on carbon dioxide (CO{sub 2}) capture, transportation, and storage technologies; utilities; oil and gas companies; nonprofit organizations; and policy/governance coordinating organizations. Both terrestrial and geologic sequestration options were evaluated in the Region during the 18-month Phase I project. A centralized Geographic Information System (GIS) database of stationary source, geologic and terrestrial sink data was developed. The GIS layer of source locations was attributed with CO{sub 2} emissions and other data and a spreadsheet was developed to estimate capture costs for the sources in the region. Phase I characterization of regional geological sinks shows that geologic storage opportunities exist in the WESTCARB region in each of the major technology areas: saline formations, oil and gas reservoirs, and coal beds. California offers outstanding sequestration opportunities because of its large capacity and the potential of value-added benefits from enhanced oil recovery (EOR) and enhanced gas recovery. The estimate for storage capacity of saline formations in the ten largest basins in California ranges from about 150 to about 500 Gt of CO{sub 2}, the potential CO{sub 2}-EOR storage was estimated to be 3.4 Gt, and the cumulative production from gas reservoirs suggests a CO{sub 2} storage capacity of 1.7 Gt. A GIS-based method for source-sink matching was implemented and preliminary marginal cost curves developed, which showed that 20, 40, or 80 Mega tonnes (Mt) of CO{sub 2} per year could be sequestered in California at a cost of $31/tonne (t), $35/t, or $50/t, respectively. Phase I also addressed key issues affecting deployment of CCS technologies, including storage-site monitoring, injection regulations, and health and environmental risks. A framework for screening and ranking candidate sites for geologic CO{sub 2} storage on the basis of HSE risk was developed. A webbased, state-by-state compilation of current regulations for injection wells, and permits/contracts for land use changes, was developed, and modeling studies were carried out to assess the application of a number of different geophysical techniques for monitoring geologic sequestration. Public outreach activities resulted in heightened awareness of sequestration among state, community and industry leaders in the Region. Assessment of the changes in carbon stocks in agricultural lands showed that Washington, Oregon and Arizona were CO{sub 2} sources for the period from 1987 to 1997. Over the same period, forest carbon stocks decreased in Washington, but increased in Oregon and Arizona. Results of the terrestrial supply curve analyses showed that afforestation of rangelands and crop lands offer major sequestration opportunities; at a price of $20 per t CO{sub 2}, more than 1,233 MMT could be sequestered over 40-years in Washington and more than 1,813 MMT could be sequestered in Oregon.

  9. The Michigan regulatory incentives study for electric utilities

    SciTech Connect (OSTI)

    Reid, M.W.; Weaver, E.M. (Barakat and Chamberlin, Inc., Oakland, CA (United States)) [Barakat and Chamberlin, Inc., Oakland, CA (United States)

    1991-06-17T23:59:59.000Z

    This is the final report of Phase I of the Michigan Regulatory Incentives Study for Electric Utilities, a three-phase review of Michigan's regulatory system and its effects on resource selection by electric utilities. The goal of Phase I is to identify and analyze financial incentive mechanisms that encourage selection of resources in accord with the principles of integrated resource planning (IRP) or least-cost planning (LCP). Subsequent study phases will involve further analysis of options and possibly a collaborative formal effort to propose regulatory changes. The Phase I analysis proceeded in three steps: (1) identification and review of existing regulatory practices that affect utilities; selection of resources, particularly DSM; (2) preliminary analysis of ten financial mechanisms, and selection of three for further study; (3) detailed analysis of the three mechanisms, including consideration of how they could be implemented in Michigan and financial modeling of their likely impacts on utilities and ratepayers.

  10. "List of Covered Electric Utilities" under the Public Utility...

    Broader source: Energy.gov (indexed) [DOE]

    8 "List of Covered Electric Utilities" under the Public Utility Regulatory Policies Act of 1978 (PURPA) - 2008 Under Title I of the Public Utility Regulatory Policies Act of 1978...

  11. "List of Covered Electric Utilities" under the Public Utility...

    Broader source: Energy.gov (indexed) [DOE]

    9 "List of Covered Electric Utilities" under the Public Utility Regulatory Policies Act of 1978 (PURPA) - 2009 Under Title I, Sec. 102(c) of the Public Utility Regulatory Policies...

  12. Test Preparation Options Free Test Prep Websites

    E-Print Network [OSTI]

    Stowell, Michael

    Test Preparation Options Free Test Prep Websites ACT: http: http://www.collegeboard.com/student/testing/sat/prep_one/test.html http://www.number2.com://testprep.princetonreview.com/CourseSearch/Search.aspx?itemCode=17&productType=F&rid=1&zip=803 02 Test Prep Classes Front Range Community College: Classes

  13. Waste disposal options report. Volume 1

    SciTech Connect (OSTI)

    Russell, N.E.; McDonald, T.G.; Banaee, J.; Barnes, C.M.; Fish, L.W.; Losinski, S.J.; Peterson, H.K.; Sterbentz, J.W.; Wenzel, D.R.

    1998-02-01T23:59:59.000Z

    This report summarizes the potential options for the processing and disposal of mixed waste generated by reprocessing spent nuclear fuel at the Idaho Chemical Processing Plant. It compares the proposed waste-immobilization processes, quantifies and characterizes the resulting waste forms, identifies potential disposal sites and their primary acceptance criteria, and addresses disposal issues for hazardous waste.

  14. Pilot Plant Options for the MFE Roadmap

    E-Print Network [OSTI]

    Pilot Plant Options for the MFE Roadmap Hutch Neilson Princeton Plasma Physics Laboratory International Workshop MFE Roadmapping for the ITER Era Princeton, NJ 10 September 2011 #12;Outline 2 · Pilot plant ­ mission, motivation, and description. · Role of pilot plants on the Roadmap to Demo. Pilot Plant

  15. Advanced ignition options for laser ICF

    E-Print Network [OSTI]

    University of Rochester and Princeton Plasma Physics Laboratory #12;FSC · With day-one hardware, the NIF can explore high-gain shock ignition - Polar Shock Ignition (uses half the NIF beams to drive the implosion: multi-FM or 2D-SSD (talk by J. Soures at this meeting) The NIF can explore advanced ignition options

  16. RTGs Options for Pluto Fast Flyby Mission

    SciTech Connect (OSTI)

    Schock, Alfred

    1993-10-01T23:59:59.000Z

    A small spacecraft design for the Pluto Fast Flyby (PFF) Mission is under study by the Jet Propulsion Laboratory (JPL) for the National Aeronautics and Space Administration (NASA), for a possible launch as early as 1998. JPL's 1992 baseline design calls for a power source able to furnish an energy output of 3963 kWh and a power output of 69 watts(e) at the end of the 9.2-year mission. Satisfying those demands is made difficult because NASA management has set a goal of reducing the spacecraft mass from a baseline value of 166 kg to ~110 kg, which implies a mass goal of less than 10 kg for the power source. To support the ongoing NASA/JPL studies, the Department of Energy's Office of Special Applications (DOE/OSA) commissioned Fairchild Space to prepare and analyze conceptual designs of radioisotope power systems for the PFF mission. Thus far, a total of eight options employing essentially the same radioisotope heat source modules were designed and subjected to thermal, electrical, structural, and mass analyses by Fairchild. Five of these - employing thermoelectric converters - are described in the present paper, and three - employing free-piston Stirling converters - are described in the companion paper presented next. The system masses of the thermoelectric options ranged from 19.3 kg to 10.2 kg. In general, the options requiring least development are the heaviest, and the lighter options require more development with greater programmatic risk. There are four duplicate copies

  17. Interdisciplinary Option Computer Science Graduation Worksheet

    E-Print Network [OSTI]

    Dyer, Bill

    Engineering 3 CSCI 338 Computer Science Theory 3 CSCI 361 Computer Architecture 3 CSCI 481 Program Assessment. · The Statistics Elective can be satisfied by any probability or statistics course, such as EIND 354Interdisciplinary Option Computer Science Graduation Worksheet 2010-2012 Semester Catalog Revised

  18. FINANCIAL & BUSINESS SERVICES Financial & Business Services

    E-Print Network [OSTI]

    FINANCIAL & BUSINESS SERVICES Financial & Business Services Presidential Briefing #12;FINANCIAL & BUSINESS SERVICES Financial & Business Services (FBS) · FBS currently has approx. 140 employees · We) ­ Financial Solutions (6) ­ Travel, Training & Policy Development (6) #12;FINANCIAL & BUSINESS SERVICES Our

  19. Colorado School of Mines Service Center Procedures

    E-Print Network [OSTI]

    will usually develop and incorporate its own indirect cost rate in order to recover utilities, space School of Mines Service Center Procedures - 2 - I. PURPOSE CSM conducts research under Government sponsored awards. Therefore, service center procedures must reflect government regulatory costing principles

  20. On the Use of Energy Storage Technologies for Regulation Services in Electric Power Systems with Significant Penetration of Wind Energy

    SciTech Connect (OSTI)

    Yang, Bo; Makarov, Yuri V.; DeSteese, John G.; Vishwanathan, Vilanyur V.; Nyeng, Preben; McManus, Bart; Pease, John

    2008-05-27T23:59:59.000Z

    Energy produced by intermittent renewable resources is sharply increasing in the United States. At high penetration levels, volatility of wind power production could cause additional problems for the power system balancing functions such as regulation. This paper reports some partial results of a project work, recently conducted by the Pacific Northwest National Laboratory (PNNL) for Bonneville Power Administration (BPA). The project proposes to mitigate additional intermittency with the help of Wide Area Energy Management System (WAEMS) that would provide a two-way simultaneous regulation service for the BPA and California ISO systems by using a large energy storage facility. The paper evaluates several utility-scale energy storage technology options for their usage as regulation resources. The regulation service requires a participating resource to quickly vary its power output following the rapidly and frequently changing regulation signal. Several energy storage options have been analyzed based on thirteen selection criteria. The evaluation process resulted in the selection of flywheels, pumped hydro electric power (or conventional hydro electric power) plant and sodium sulfur or nickel cadmium batteries as candidate technologies for the WAEMS project. A cost benefit analysis should be conducted to narrow the choice to one technology.

  1. ENERGY COMMISSION PUBLIC UTILITIES COMMISSION

    E-Print Network [OSTI]

    CALIFORNIA ENERGY COMMISSION CALIFORNIA PUBLIC UTILITIES COMMISSION FOR IMMEDIATE RELEASE Prosper, California Public Utilities Commission, 415.703.2160 GREENHOUSE GAS STRATEGIES OPINION RELEASED SACRAMENTO -- The California Energy Commission and the California Public Utilities Commission today released

  2. Utility View of Risk Assessment

    E-Print Network [OSTI]

    Bickham, J.

    This paper will address a utility perspective in regard to risk assessment, reliability, and impact on the utility system. Discussions will also include the critical issues for utilities when contracting for energy and capacity from cogenerators...

  3. Transportation Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transportation Services Transporting nuclear materials within the United States and throughout the world is a complicated and sometimes highly controversial effort requiring...

  4. Innovative Utility Pricing for Industry

    E-Print Network [OSTI]

    Ross, J. A.

    INNOVATIVE UTILITY PRICING FOR INDUSTRY James A. Ross Drazen-Brubaker &Associates, Inc. St. Louis, Missouri ABSTRACT The electric utility industry represents only one source of power available to industry. Al though the monopolistic... structure of the electric utility industry may convey a perception that an electric utility is unaffected by competition, this is an erroneous perception with regard to in dustry. Electric utilities face increased compe tition, both from other utilities...

  5. Confidential data in a competitive utility environment: A regulatory perspective

    SciTech Connect (OSTI)

    Vine, E.

    1996-08-01T23:59:59.000Z

    Historically, the electric utility industry has been regarded as one of the most open industries in the United States in sharing information but their reputation is being challenged by competitive energy providers, the general public, regulators, and other stakeholders. As the prospect of competition among electricity power providers has increased in recent years, many utilities have been requesting that the data they submit to their utility regulatory commissions remain confidential. Withholding utility information from the public is likely to have serious and significant policy implications with respect to: (1) consumer education, the pursuit of truth, mutual respect among parties, and social cooperation; (2) the creation of a fair market for competitive energy services; (3) the regulatory balance; (4) regional and national assessments of energy-savings opportunities; (5) research and development; and (6) evaluations of utility programs, plans, and policies. In a telephone survey of all public utility commissions (PUCs) that regulate electric and gas utilities in the U.S., we found that almost all PUCs have received requests from utility companies for data to be filed as confidential, and confidential data filings appear to have increased (both in scope and in frequency) in those states where utility restructuring is being actively discussed. The most common types of data submitted as confidential by utilities dealt with specific customer data, market data, avoided costs, and utility costs.

  6. Gnie civil, option gestion et entrepreneuriat en ingnierie / Civil Engineering, Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie civil, option gestion et entrepreneuriat en ingénierie / Civil Engineering, Engineering or CVG4148. Bien que les cotes de cours apparaissent dans les deux langues (anglais/français), les cours

  7. Gnie chimique / Chemical Engineering Option gestion et entrepreneuriat en ingnierie / Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie chimique / Chemical Engineering Option gestion et entrepreneuriat en ingénierie / Engineering GNG4170/4570 2010.12.02 Bien que les cotes de cours apparaissent dans les deux langues (anglais

  8. Gnie chimique / Chemical Engineering Option gestion et entrepreneuriat en ingnierie / Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie chimique / Chemical Engineering Option gestion et entrepreneuriat en ingénierie / Engineering GNG4170/4570 2011.11.07 Bien que les cotes de cours apparaissent dans les deux langues (anglais

  9. Gnie civil, option gestion et entrepreneuriat en ingnierie / Civil Engineering, Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie civil, option gestion et entrepreneuriat en ingénierie / Civil Engineering, Engineering cotes de cours apparaissent dans les deux langues (anglais/français), les cours en français ne sont pas

  10. Gnie chimique / Chemical Engineering Option gestion et entrepreneuriat en ingnierie / Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie chimique / Chemical Engineering Option gestion et entrepreneuriat en ingénierie / Engineering GNG4170/4570 2010.03.21 Bien que les cotes de cours apparaissent dans les deux langues (anglais

  11. Gnie civil, option gestion et entrepreneuriat en ingnierie / Civil Engineering, Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie civil, option gestion et entrepreneuriat en ingénierie / Civil Engineering, Engineering, CVG4113, CVG4130 or CVG4148. Bien que les cotes de cours apparaissent dans les deux langues (anglais

  12. Utility Power Plant Construction (Indiana)

    Broader source: Energy.gov [DOE]

    This statute requires a certificate of necessity from the Indiana Utility Regulatory Commission for the construction, purchase, or lease of an electricity generation facility by a public utility.

  13. Utility Energy Savings Contract Project

    Broader source: Energy.gov [DOE]

    Presentation covers the Utility Energy Savings Contract Project and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

  14. Options for treating high-temperature gas-cooled reactor fuel for repository disposal

    SciTech Connect (OSTI)

    Lotts, A.L.; Bond, W.D.; Forsberg, C.W.; Glass, R.W.; Harrington, F.E.; Micheals, G.E.; Notz, K.J.; Wymer, R.G.

    1992-02-01T23:59:59.000Z

    This report describes the options that can reasonably be considered for disposal of high-temperature gas-cooled reactor (HTGR) fuel in a repository. The options include whole-block disposal, disposal with removal of graphite (either mechanically or by burning), and reprocessing of spent fuel to separate the fuel and fission products. The report summarizes what is known about the options without extensively projecting or analyzing actual performance of waste forms in a repository. The report also summarizes the processes involved in convert spent HTGR fuel into the various waste forms and projects relative schedules and costs for deployment of the various options. Fort St. Vrain Reactor fuel, which utilizes highly-enriched {sup 235}U (plus thorium) and is contained in a prismatic graphite block geometry, was used as the baseline for evaluation, but the major conclusions would not be significantly different for low- or medium-enriched {sup 235}U (without thorium) or for the German pebble-bed fuel. Future US HTGRs will be based on the Fort St. Vrain (FSV) fuel form. The whole block appears to be a satisfactory waste form for disposal in a repository and may perform better than light-water reactor (LWR) spent fuel. From the standpoint of process cost and schedule (not considering repository cost or value of fuel that might be recycled), the options are ranked as follows in order of increased cost and longer schedule to perform the option: (1) whole block, (2a) physical separation, (2b) chemical separation, and (3) complete chemical processing.

  15. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    wood with supplementary fuels such as coal, oil, natural gas, and coke by pulp and paper mills and wood, knots, chips, etc. with other supplementary fuels such as coal, oil, natural gas, and coke to generateCenter for By-Products Utilization DEVELOPMENT OF CLSM USING COAL ASH AND WOOD ASH, A SOURCE OF NEW

  16. Physical Plant Utility Department

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    of Massachusetts Amherst Electrical Distribution & Outdoor Lighting 3.0 Table of Contents Page 1 UMass Medium buses at the Eastside sub-station. The Eastside sub-station is comprised of two separate buses with a normally open bus tie. Each bus is automatically backed up by separate utility feeds. The Eastside Sub-station

  17. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    currently being produced by Manitowoc Public Utilities. Flowable Materials have up to 1200 psi compressive of water, and consist mostly of ash or similar materials. It is believed that concrete Bricks, Blocks in manufacturing Blended Cements. Soil stabilization or site remediation is another significant potential use

  18. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    consume all of the ashes currently being produced by Manitowoc Public Utilities. Flowable Materials have little portland cement and a lot of water, and consist mostlyof ash or similar materials. It is believed fly ash in manufacturing Blended Cements. Soil stabilization or site remediation is another

  19. INTRODUCTION Ukiah Electric Utility

    E-Print Network [OSTI]

    INTRODUCTION Ukiah Electric Utility Renewable Energy Resources Procurement Plan Per Senate Billlx 2 renewable energy resources, including renewable energy credits, as a specified percentage of Ukiah's total,2011 to December 31, 2013, Ukiah shall procure renewable energy resources equivalent to an average of at least

  20. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    Issued to the Illinois Clean Coal Institute For Project 02-1/3.1D-2 Department of Civil Engineering of technology and market development for controlled low-strength material (CLSM) slurry using Illinois coal ashCenter for By-Products Utilization IMPLEMENTATION OF FLOWABLE SLURRY TECHNOLOGY IN ILLINOIS

  1. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    technologies. A clean-coal ash is defined as the ash derived from SOxand NOxcontrol technologies, and FBC that obtained from clean-coal technology, are not utilized in cast-concrete masonry products (bricks, blocks conventional and clean-coal technologies. Fifteen high-sulfur coal ash samples were obtained from eight

  2. Advanced fossil energy utilization

    SciTech Connect (OSTI)

    Shekhawat, D.; Berry, D.; Spivey, J.; Pennline, H.; Granite, E.

    2010-01-01T23:59:59.000Z

    This special issue of Fuel is a selection of papers presented at the symposium ‘Advanced Fossil Energy Utilization’ co-sponsored by the Fuels and Petrochemicals Division and Research and New Technology Committee in the 2009 American Institute of Chemical Engineers (AIChE) Spring National Meeting Tampa, FL, on April 26–30, 2009.

  3. Utility spot pricing, California

    E-Print Network [OSTI]

    Schweppe, Fred C.

    1982-01-01T23:59:59.000Z

    The objective of the present spot pricing study carried out for SCE and PG&E is to develop the concepts which wculd lead to an experimental design for spot pricing in the two utilities. The report suggests a set of experiments ...

  4. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    and paper mills in concrete. INTRODUCTION Concrete is a porous solid that is created by combining four basicCenter for By-Products Utilization CURING TEMPERATURE EFFECTS ON HIGH-PERFORMANCE CONCRETE By Tarun For presentation and publication at the symposium entitled "High-Performance Concrete and Concrete for Marine

  5. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    -burning electricity gene-ration is the current principal energy source. The total amounts of fly ash and bottom ash, University of Wisconsin - Milwaukee #12;The bar graph (Fig. 1) compares the production and utilization of fly shows the percentage of various usage of fly ash in China in 1988 [1]. Fig. 2 Percentage of Fly Ash

  6. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    -Products Utilization University of Wisconsin-Milwaukee ABSTRACT This project consisted of performance testing at a typical electric power plant. One of the goals of this project was to determine the feasibility of using. The carbonation reaction of the CLSM would also have the potential to reduce carbon dioxide emissions at a coal-fired

  7. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    . Naik, Rudolph N. Kraus, Shiw S. Singh, Lori- Lynn C. Pennock, and Bruce Ramme Report No. CBU-2001 with numerous projects on the use of by-product materials including utilization of used foundry sand and fly ash;2 INTRODUCTION Wood FA is generated due to combustion of wood for energy production at pulp and paper mills, saw

  8. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    Center for By-Products Utilization CHARACTERIZATION AND APPLICATION OF CLASSF FLY ASHCOAL AND CLEAN-COAL #12;-1- CHARACTERIZATION AND APPLICATION OF CLASSF FLYASHCOAL AND CLEAN-COAL ASHFOR CEMENT -Milwaukee (UWM) Daniel D.Banerjee, Project Manager,Illinois Clean Coal Institute RudolphN.Kraus, Research

  9. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    Center for By-Products Utilization USE OF CLEAN-COAL ASH FOR MANAGING ASR By Zichao Wu and Tarun R College of Engineering and Applied Science THE UNIVERSITY OF WISCONSIN­MILWAUKEE #12;USE OF CLEAN-COAL ASH combustion by-products (such as clean-coal ash) from power plants. Maximum recycling of such by- products

  10. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    Center for By-Products Utilization CARBON DIOXIDE SEQUESTRATION IN NO-FINES CONCRETE By Tarun R;CARBON DIOXIDE SEQUESTRATION IN NO-FINES CONCRETE ABSTRACT By Tarun, R. Naik, Yoon-moon Chun, Rudolph N. Kraus, and Fethullah Canpolat This paper presents a detailed experimental study on the sequestration

  11. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    Center for By-Products Utilization USE OF CLEAN COAL ASH AS SETTING TIME REGULATOR IN PORTLAND OF WISCONSIN ­ MILWAUKEE #12;2 Use of Clean Coal Ash as Setting Time Regulator in Portland Cement by Zichao Wu as setting time regulator for portland cement production. In this paper a source of clean coal ash (CCA

  12. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    Center for By-Products Utilization HIGH-STRENGTH HVFA CONCRETE CONTAINING CLEAN COAL ASH By Tarun R #12;1 HIGH-STRENGTH HVFA CONCRETE CONTAINING CLEAN COAL ASH By Tarun R. Naik, Shiw S. Singh, and Bruce for manufacture of cement-based products using ashes generated from combustion of high-sulfur coals. A clean coal

  13. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    was carried out to utilize wood ash in making self- compacting controlled low-strength materials (CLSM), air and Presentation at the Seventh CANMET/ACI International Conference on Recent Advances in Concrete Technology, Las-entrained and non-air- entrained concretes, and bricks/blocks/paving stones. Initial test results indicated

  14. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    SELF-COMPACTING CONCRETE By Tarun R. Naik, Rudolph N. Kraus, and Yoon-moon Chun Report No. CBU-2004 of Limestone Quarry By-Products for Developing Economical Self-Compacting Concrete Principle Investigator Name. For this proposed project, self-compacting concrete mixtures will be developed for prototype production that utilize

  15. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    Center for By-Products Utilization SELF-COMPACTING CONCRETE (SCC) OR SELF- LEVELING CONCRETE (SLC - MILWAUKEE #12;2 SELF-COMPACTING CONCRETE (SCC) OR SELF ­LEVELING CONCRETE (SLC) INTRODUCTION Self-compacting as the concrete which can be placed and compacted into every corner of a form work, purely by means of its self

  16. By-Products Utilization

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    , compressive strength, concrete testing, fly ash, high-performance concrete, hot weather, permeability, silica Testing of Concrete", Committee 214, "Evaluation of Results of Strength Tests of Concrete", and CommitteeCenter for By-Products Utilization STRENGTH AND DURABILITY OF HIGH- PERFORMANCE CONCRETE SUBJECTED

  17. The Risks and Rewards of Participation in Demand Side Bidding Programs; an Energy Service Company Perspective

    E-Print Network [OSTI]

    Machold, W. D.

    1994-01-01T23:59:59.000Z

    with participation by ESCOs in utility sponsored DSM programs: 1. Utility Competition ESCOs seeking to participate in utility sponsored DSM bidding programs must evaluate current and planned rebate and/or customized programs budgeted by utilities.... The utility customer lay appreciate having the choice between utility )onsored rebate programs and third party service roviders. However, from an ESCO viewpoint, ~mpetition with utility sponsored programs can -ode the market and thereby result...

  18. UTILITY MAXIMISATION AND UTILITY INDIFFERENCE PRICE FOR EXPONENTIAL

    E-Print Network [OSTI]

    Boyer, Edmond

    UTILITY MAXIMISATION AND UTILITY INDIFFERENCE PRICE FOR EXPONENTIAL SEMI-MARTINGALE MODELS WITH RANDOM FACTOR A. Ellanskaya1 and L. Vostrikova2 Abstract. We consider utility maximization problem to the conditional one, given = u, which we solve using dual approach. For HARA utilities we con- sider information

  19. Helping Utilities Make Smart Solar Decisions Utility Barriers

    E-Print Network [OSTI]

    Homes, Christopher C.

    Helping Utilities Make Smart Solar Decisions Utility Barriers Key issues facing deployment of utility-scale solar PV plants. Sandra Burton Regional Director March 8 ­ 9, 2011 Brookhaven National Lab #12;About SEPA Developed by utilities to facilitate the integration of solar electric power. SEPA

  20. Facilities Services Overview & Discussion

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    & Finance Facilities Services Director: Jeff Butler Human Resources Administrative Services Engineering) Environmental Services Morrison (3) Admin Services Evans (1) Human Resources Engineering (4) ·EngineeringFacilities Services Overview & Discussion Jeff Butler Director ­ Facilities Services November 2011

  1. MCNP6 Cosmic-Source Option

    SciTech Connect (OSTI)

    McKinney, Gregg W [Los Alamos National Laboratory; Armstrong, Hirotatsu [Los Alamos National Laboratory; James, Michael R [Los Alamos National Laboratory; Clem, John [University of Delaware, BRI; Goldhagen, Paul [DHS, National Urban Security Technology Laboratory

    2012-06-19T23:59:59.000Z

    MCNP is a Monte Carlo radiation transport code that has been under development for over half a century. Over the last decade, the development team of a high-energy offshoot of MCNP, called MCNPX, has implemented several physics and algorithm improvements important for modeling galactic cosmic-ray (GCR) interactions with matter. In this presentation, we discuss the latest of these improvements, a new Cosmic-Source option, that has been implemented in MCNP6.

  2. Understanding Leasing Options for Energy Projects

    E-Print Network [OSTI]

    Davenport, B.

    2005-01-01T23:59:59.000Z

    UNDERSTANDING LEASING OPTIONS FOR ENERGY PROJECTS Baker Davenport Davenport Finance Company Richmond, Virginia Industrials often find it difficult to fund energy projects with internal monies. Energy projects must compete with the company...?s ?core? assets for capital dollars. Leasing can be used to overcome some of these hurdles. Topics of discussion will include several key leasing structures, with benefits and disadvantages noted. Project financing is also discussed as a way...

  3. Cyanide treatment options in coke plants

    SciTech Connect (OSTI)

    Minak, H.P.; Lepke, P. [Krupp Uhde GmbH, Dortmund (Germany)

    1997-12-31T23:59:59.000Z

    The paper discusses the formation of cyanides in coke oven gas and describes and compares waste processing options. These include desulfurization by aqueous ammonia solution, desulfurization using potash solution, desulfurization in oxide boxes, decomposition of NH{sub 3} and HCN for gas scrubbing. Waste water treatment methods include chemical oxidation, precipitation, ion exchange, reverse osmosis, and biological treatment. It is concluded that biological treatment is the most economical process, safe in operation and requires a minimum of manpower.

  4. Seattle's system for evaluating energy options

    SciTech Connect (OSTI)

    Logie, P.; Macdonald, M.J.

    1982-01-01T23:59:59.000Z

    In 1975, the City Council developed a blueprint called Energy 1990 for meeting Seattle's future electric energy needs. Priorities for addressing or offsetting expected growth in demand are in order: (1) conservation (2) hydroelectricity (3) other renewable sources such as wind, biomass, solar, and geothermal energy (4) abundant nonrenewable resources such as coal, and (5) other renewables. An energy resources planning group was formed and a data base was established. Resource options were investigated and the recommendations were published.

  5. Modeling Dependence in Data: Options Pricing and Random Walks

    E-Print Network [OSTI]

    Kumar, Nitesh

    2013-01-01T23:59:59.000Z

    option pricing under GARCH by a Markov chain approximation.S. (2000). A closed-form GARCH option valuation model. Theof stochastic and/or GARCH volatility (Heston, 1993; Heston

  6. A streamlined real options model for Real Estate Development

    E-Print Network [OSTI]

    Barman, Baabak

    2007-01-01T23:59:59.000Z

    This thesis introduces a streamlined model that incorporates the value of the real options that exist in real estate development projects. Real options add value to a project by providing developers with flexibility to ...

  7. Using Options to Hedge Farm and Ranch Inputs

    E-Print Network [OSTI]

    Anderson, David P.; McCorkle, Dean; Schwart Jr., Robert B.; O'Brien, Daniel

    1999-09-29T23:59:59.000Z

    A call option is a pricing tool that helps producers manage the price risks associated with farm and ranch inputs. This publication offers a thorough explanation of the way call options work. It includes various strategies producers might use...

  8. The British Asian Option K. Glover, G. Peskir & F. Samee

    E-Print Network [OSTI]

    Sidorov, Nikita

    The British Asian Option K. Glover, G. Peskir & F. Samee Sequential Anal. Vol. 29, No. 3, 2010 Option K. Glover, G. Peskir & F. Samee Sequential Anal. Vol. 29, No. 3, 2010, (311­327) Research Report

  9. The British Russian Option K. Glover, G. Peskir & F. Samee

    E-Print Network [OSTI]

    Sidorov, Nikita

    The British Russian Option K. Glover, G. Peskir & F. Samee Stochastics Vol. 83, No. 4-6, 2011, (315 and Statistics Group School of Mathematics, The University of Manchester #12;The British Russian Option K. Glover

  10. Impacts of project management on real option values

    E-Print Network [OSTI]

    Bhargav, Shilpa Anandrao

    2005-02-17T23:59:59.000Z

    reduces the value of real options. The example of resource allocation is used to test this hypothesis. Based on the results, it is concluded that project management reduces the value of real options by reducing variance of the exercise signal...

  11. Options for Burning LWR SNF in LIFE Engine

    SciTech Connect (OSTI)

    Farmer, J

    2008-09-09T23:59:59.000Z

    We have pursued two processes in parallel for the burning of LWR SNF in the LIFE engine: (1) solid fuel option and (2) liquid fuel option. Approaches with both are discussed. The assigned Topical Report on liquid fuels is attached.

  12. Analysis of sustainable water supply options for Kuwait

    E-Print Network [OSTI]

    Murtaugh, Katharine A. (Katharine Ann)

    2006-01-01T23:59:59.000Z

    This thesis considers several options for improving the sustainability of Kuwait's water supply system. The country currently relies heavily on desalination and brackish groundwater extraction. The options considered for ...

  13. STEP Utility Data Release Form

    Broader source: Energy.gov [DOE]

    STEP Utility Data Release Form, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  14. STEP Utility Bill Analysis Report

    Broader source: Energy.gov [DOE]

    STEP Utility Bill Analysis Report, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  15. Technological options for management of hazardous wastes from US Department of Energy facilities

    SciTech Connect (OSTI)

    Chiu, S.; Newsom, D.; Barisas, S.; Humphrey, J.; Fradkin, L.; Surles, T.

    1982-08-01T23:59:59.000Z

    This report provides comprehensive information on the technological options for management of hazardous wastes generated at facilities owned or operated by the US Department of Energy (DOE). These facilities annually generate a large quantity of wastes that could be deemed hazardous under the Resource Conservation and Recovery Act (RCRA). Included in these wastes are liquids or solids containing polychlorinated biphenyls, pesticides, heavy metals, waste oils, spent solvents, acids, bases, carcinogens, and numerous other pollutants. Some of these wastes consist of nonnuclear hazardous chemicals; others are mixed wastes containing radioactive materials and hazardous chemicals. Nearly 20 unit processes and disposal methods are presented in this report. They were selected on the basis of their proven utility in waste management and potential applicability at DOE sites. These technological options fall into five categories: physical processes, chemical processes, waste exchange, fixation, and ultimate disposal. The options can be employed for either resource recovery, waste detoxification, volume reduction, or perpetual storage. Detailed descriptions of each technological option are presented, including information on process performance, cost, energy and environmental considerations, waste management of applications, and potential applications at DOE sites. 131 references, 25 figures, 23 tables.

  16. Pricing A Class of Multiasset Options using Information on Smaller ...

    E-Print Network [OSTI]

    2007-03-19T23:59:59.000Z

    Mar 19, 2007 ... Extensions to markets where only a finite set of options are traded on ...... On non-

  17. Emergence of Distributed Engineering Web Services , David Liu2

    E-Print Network [OSTI]

    Stanford University

    Emergence of Distributed Engineering Web Services Jun Peng1 , David Liu2 , Jinxing Cheng3 , Charles engineering web services. This paper presents three example applications utilizing some of these protocols large engineering software applications. Introduction The world of web services is evolving very quickly

  18. PP/OP 02.07 Engineering Services Addendum

    E-Print Network [OSTI]

    Gelfond, Michael

    PP/OP 02.07 Engineering Services Addendum 01/05/2011 LOCKOUT AND TAGOUT POLICY Engineering Services Energy (Lockout/Tagout). b. Chapter XVII §1910.306(c); Elevators, dumbwaiters, escalators 29CFR), it will be the policy of Engineering Services to coordinate any needed tagout/lockout with the Utilities and/or Building

  19. Utility Maximization under Uncertainty

    E-Print Network [OSTI]

    Li, Jian

    2010-01-01T23:59:59.000Z

    Motivated by several search and optimization problems over uncertain datasets, we study the stochastic versions of a broad class of combinatorial problems where either the existences or the weights of the elements in the input dataset are uncertain. The class of problems that we study includes shortest paths, minimum weight spanning trees, and minimum weight matchings over probabilistic graphs; top-k queries over probabilistic datasets; and other combinatorial problems like knapsack. By noticing that the expected value is inadequate in capturing different types of risk-averse or risk-prone behaviors, we consider a more general objective which is to maximize the expected utility of the solution for some given utility function. For weight uncertainty model, we show that we can obtain a polynomial time approximation algorithm with additive error eps for any eps>0, if there is a pseudopolynomial time algorithm for the exact version of the problem. Our result generalizes several prior works on stochastic shortest ...

  20. An Accurate and Provably Efficient GARCH Option Pricing Tree

    E-Print Network [OSTI]

    Lyuu, Yuh-Dauh

    An Accurate and Provably Efficient GARCH Option Pricing Tree Advisor: Prof. Yuh-Dauh Lyuu Chi-Ning Wu Department of Finance National Taiwan University #12;Abstract The trinomial-tree GARCH option not prevent explosion. This thesis then presents a trinomial-tree GARCH option pricing algorithm that solves

  1. Cache-Optimal Algorithms for Option Pricing John E. Savage

    E-Print Network [OSTI]

    Savage, John

    , and the leaves are at expiration times. We use G (n) biop to determine the price of an option at the root node a discrete time model [Kwok 1998; Cox et al. 1979]. The binomial option pricing computation is modeledCache-Optimal Algorithms for Option Pricing John E. Savage Brown University, Providence, Rhode

  2. PRICING AND HEDGING SPREAD OPTIONS RENE CARMONA AND VALDO DURRLEMAN

    E-Print Network [OSTI]

    Carmona, Rene

    energy prices dynamics, and we explain how the pricing and hedging algorithms can be implemented bothPRICING AND HEDGING SPREAD OPTIONS REN´E CARMONA AND VALDO DURRLEMAN ABSTRACT. We survey the theoretical and the computational problems associated with the pricing of spread options. These options

  3. Architecture independent parallel binomial tree option price valuations

    E-Print Network [OSTI]

    Gerbessiotis, Alexandros V.

    Architecture independent parallel binomial tree option price valuations Alexandros V. Gerbessiotis­02 #12; Architecture independent parallel binomial tree option price valuations Alexandros V in American or European­style option valuations can be performed in parallel in the binomial­tree model

  4. Industrial Engineering-BS ,PhD option in Engineering

    E-Print Network [OSTI]

    Dyer, Bill

    I Industrial Engineering- BS ,PhD option in Engineering Industrial & Management Engineering - BS MS Applied Mathematics - BS optionin Mathematics Applied Mechanics PhD option in Engineering Applied; teaching "minor, Art History minor Art.History - BA option in Art; minor B Bio-resources`Engineering - BS

  5. THE COSTS AND BENEFITS OF A PUBLIC OPTION IN

    E-Print Network [OSTI]

    Kammen, Daniel M.

    THE COSTS AND BENEFITS OF A PUBLIC OPTION IN HEALTH CARE REFORM: An Economic Analysis Ethan Kaplan and Benefits of a Public Option in Health Care Reform: An Economic Analysis ACKNOWLEDGMENTS We would like Security|The Costs and Benefits of a Public Option in Health Care Reform: An Economic Analysis EXECUTIVE

  6. The Information in Option Volume for Future Stock Prices

    E-Print Network [OSTI]

    Gabrieli, John

    that option trading volume contains information about future stock prices. Taking advantage of a unique dataThe Information in Option Volume for Future Stock Prices Jun Pan MIT Sloan School of Management set, we construct put-call ratios from option volume initiated by buyers to open new positions. Stocks

  7. Utility Energy Services Contracts: Enabling Documents (rev.3...

    Broader source: Energy.gov (indexed) [DOE]

    Products * Inserting 10 USC 2916, Sale of Electricity from Alternate Energy and Cogeneration Production Facilities * Inserting amended 10 USC 2866, Water Conservation at...

  8. The Sustainable Energy Utility (SEU) Model for Energy Service Delivery

    E-Print Network [OSTI]

    Delaware, University of

    -oriented focus. Conventional energy suppliers are very capable of marketing and delivering energy products

  9. Utility Energy Service Contract Case Studies | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment of EnergyProgram2-26The ConfederatedSolarusingEnergy Provides

  10. Utility Energy Services Contracts Guide | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment of EnergyProgram2-26The ConfederatedSolarusingEnergy

  11. Utility Energy Service Contracts - Lessons Learned | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned SmallOf The 2012Nuclear Guide Remote Access toDeployment |

  12. Utility Energy Services Contracts: Enabling Documents Overview | Department

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned SmallOf The 2012Nuclear Guide Remote Access toDeployment |Project Fundingof

  13. Utility Energy Services Contracts: Enabling Documents, May 2009 |

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned SmallOf The 2012Nuclear Guide Remote Access toDeployment |Project

  14. Rural Utilities Service Electric Program | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromCommentsRevolving Loan Funds Revolving LoanA lEnergy for

  15. Financing for Utility Energy Service Contracts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecordFederal Registry CommentsOverview » Financing

  16. Diversifying Project Portfolios for Utility Energy Service Contracts |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat Pump Models |Conduct, Parent(CRADA and DOW Area 5(Presentation)Distribution:Work

  17. Chapter 41 - Acquisition of Utility Services | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energyon ArmedWaste andAccessCO2 Injection Begins8: Variable Frequency3:Chapter 37 -4:

  18. Resources on Utility Energy Service Contracts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergyDepartmentEnergyHydrokineticClothes WashersDepartmentProgram Areas

  19. Getting the Best Value with Utility Energy Service Contracts | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdf Flash2006-53.pdf0.pdfCostAnalysis GeothermalEnergy GeothermalGet started onof

  20. Types of Utility Energy Service Contracts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment of EnergyTheDepartment of EnergyDepartmentProject Funding

  1. Utility Energy Service Contract Case Studies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment of Dept. ofUSA RSDepartment

  2. Utility Energy Services Contract Data Collection Confidentiality Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyTheTwo New12.'6/0.2Contract (UESC) is not an Energy| Department

  3. Utility Energy Services Contracting Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyTheTwo New12.'6/0.2Contract (UESC) is not an Energy|

  4. Utility Energy Services Contracts: Enabling Documents DRAFT | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyTheTwo New12.'6/0.2Contract (UESC) is not an Energy|Energy

  5. Utility Energy Services Contracts: Enabling Documents Update | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyTheTwo New12.'6/0.2Contract (UESC) is not an

  6. Utility Energy Services Contracts: Enabling Documents, May 2009 (Revised) (Book)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyTheTwo New12.'6/0.2Contract (UESC) is not an www.femp.energy.gov

  7. Mandi: A Market Exchange for Trading Utility Computing Services

    E-Print Network [OSTI]

    Buyya, Rajkumar

    . A number of companies have started building Cloud and Grid computing environments, and offering access on demand, rather than maintaining their own expensive HPC infrastructure. For such communities, it would providers. The presence of a Market Exchange (ME) infrastructure can easily fulfill their demand for compute

  8. Cogeneration: An Industrial Steam and Power Option

    E-Print Network [OSTI]

    Orlando, J. A.; Stewart, M. M.; Roberts, J. R.

    Industrial facilities of all sizes have the ability to reduce and better control both power and steam costs with a cogeneration system. Unlike the larger systems that sell almost all of the cogenerated power to a regulated electric utility...

  9. T:\\P roj ects\\CEC \\NG_ Utility S ervice T erri tories\\ Web m aps\\NG S ervice Area_W eb _ A siz e.m xd 0 50 10025 Miles

    E-Print Network [OSTI]

    Utility Service Areas Service Area LONG BEACH GAS & OIL NO SERVICE OUTSIDE OF CALIFORNIA SERVICE CITY^_ PG&E SCG Southwest Gas Southwest Gas SDG&E City of Susanville City of Palo Alto Long Beach Gas & Oil City of Vernon Southwest Gas Sacramento Tuscarora T:\\P roj ects\\CEC \\NG_ Utility S ervice T erri

  10. Mass-Transit Options Around Brandeis University

    E-Print Network [OSTI]

    Fraden, Seth

    Area It is possible to get anywhere usinga combination of MBTA services, includingthe T, commuter rail, andbus lines (2010), Julia Marder (2010) Information & Images courtesyof: http://www.mbta.com http

  11. THE ECONOMIC THRESHOLD WITH A STOCHASTIC PEST POPULATION: A REAL OPTIONS APPROACH

    E-Print Network [OSTI]

    Saphores, Jean-Daniel M

    2007-01-01T23:59:59.000Z

    101. Trigeorgis, L. , Real Options: Managerial FlexibilityPEST POPULATION: A REAL OPTIONS APPROACH ? Jean-Daniel M.Keywords: Uncertainty; Real Options; Pest Control; Reentry

  12. The New Face of Utility Marketing

    E-Print Network [OSTI]

    Gilbert, J. S.

    of just one advisors, attempting alternatives to management. But, by the way, do to sell. You aren't idea. You are energy to offer the best of your customer or you present 20 ideas when asked for your opinion. People don't want to choose between...THE NEW FACE OF UTILITY MARKETING Joel S. Gilbert, P.E., Director Energy Management & Planning Services Dames & Moore, Bethesda, Maryland Introduction Ho hum, another conference about energy conservation. Oh, let's call it a conference...

  13. Wildlife Services

    E-Print Network [OSTI]

    Texas Wildlife Services

    2007-05-23T23:59:59.000Z

    Wildlife Services, part of Texas Cooperative Extension, is an agency created to assist the public in managing the problems sometimes caused by wildlife. Its objectives are to protect wildlife, crops, livestock, property and human health...

  14. A primer on incentive regulation for electric utilities

    SciTech Connect (OSTI)

    Hill, L.J.

    1995-10-01T23:59:59.000Z

    In contemplating a regulatory approach, the challenge for regulators is to develop a model that provides incentives for utilities to engage in socially desirable behavior. In this primer, we provide guidance on this process by discussing (1) various models of economic regulation, (2) problems implementing these models, and (3) the types of incentives that various models of regulation provide electric utilities. We address five regulatory models in depth. They include cost-of-service regulation in which prudently incurred costs are reflected dollar-for-dollar in rates and four performance-based models: (1) price-cap regulation, in which ceilings are placed on the average price that a utility can charge its customers; (2) revenue-cap regulation, in which a ceiling is placed on revenues; (3) rate-of-return bandwidth regulation, in which a utility`s rates are adjusted if earnings fall outside a {open_quotes}band{close_quotes} around equity returns; and (4) targeted incentives, in which a utility is given incentives to improve specific components of its operations. The primary difference between cost-of-service and performance-based approaches is the latter sever the tie between costs and prices. A sixth, {open_quotes}mixed approach{close_quotes} combines two or more of the five basic ones. In the recent past, a common mixed approach has been to combine targeted incentives with cost-of-service regulation. A common example is utilities that are subject to cost-of-service regulation are given added incentives to increase the efficiency of troubled electric-generating units.

  15. Financing Non-Residential Photovoltaic Projects: Options and Implications

    E-Print Network [OSTI]

    Bolinger, Mark

    2009-01-01T23:59:59.000Z

    23 4.4 Service Contract (24 4.5 Pre-Paid Service Contract (the full report). • Service Contract (Partnership): The site

  16. Federal Utility Partnership Working Group- Utility Interconnection Panel

    Broader source: Energy.gov [DOE]

    Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—discusses solar/photovoltaic (PV) projects to connect with utility in California and their issues.

  17. Time functions as utilities

    E-Print Network [OSTI]

    E. Minguzzi

    2009-09-04T23:59:59.000Z

    Every time function on spacetime gives a (continuous) total preordering of the spacetime events which respects the notion of causal precedence. The problem of the existence of a (semi-)time function on spacetime and the problem of recovering the causal structure starting from the set of time functions are studied. It is pointed out that these problems have an analog in the field of microeconomics known as utility theory. In a chronological spacetime the semi-time functions correspond to the utilities for the chronological relation, while in a K-causal (stably causal) spacetime the time functions correspond to the utilities for the K^+ relation (Seifert's relation). By exploiting this analogy, we are able to import some mathematical results, most notably Peleg's and Levin's theorems, to the spacetime framework. As a consequence, we prove that a K-causal (i.e. stably causal) spacetime admits a time function and that the time or temporal functions can be used to recover the K^+ (or Seifert) relation which indeed turns out to be the intersection of the time or temporal orderings. This result tells us in which circumstances it is possible to recover the chronological or causal relation starting from the set of time or temporal functions allowed by the spacetime. Moreover, it is proved that a chronological spacetime in which the closure of the causal relation is transitive (for instance a reflective spacetime) admits a semi-time function. Along the way a new proof avoiding smoothing techniques is given that the existence of a time function implies stable causality, and a new short proof of the equivalence between K-causality and stable causality is given which takes advantage of Levin's theorem and smoothing techniques.

  18. Utilize Available Resources

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500II Field EmissionFunctionalPortal BuildingProjectUtilize

  19. Utilities | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 South Place: Salt Lake City, Utah Zip: 84111Jump to:

  20. Utilize Available Resources

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered energy consumption by sectorlongUpdates byUserUtility-Scale Solar through the

  1. Extraction Utility Design Specification

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office of Audit|Department of Energy56Executive212-2012 June 2012Extraction Utility

  2. Distillation: Still towering over other options

    SciTech Connect (OSTI)

    Kunesh, J.G. [Fractionation Research, Inc., Stillwater, OK (United States); Kister, H.Z. [Brown and Root, Inc., Alhambra (Canada); Lockett, M.J. [Praxair, Inc., Tonawanda, NY (United States); Fair, J.R. [Univ. of Texas, Austin, TX (United States)

    1995-10-01T23:59:59.000Z

    Distillation dominates separations in the chemical process industries (CPI), at least for mixtures that normally are processed as liquids. The authors fully expect that distillation will continue to be the method of choice for many separations, and the method against which other options must be compared. So, in this article, they will put into some perspective just why distillation continues to reign as the king of separations, and what steps are being taken to improve its applicability and performance, as well as basic understanding of the technique.

  3. Food Options | Stanford Synchrotron Radiation Lightsource

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickr Flickr Editor's note: Since the FlickrFluorimeterFood Options

  4. Utility Partnership Webinar Series: State Mandates for Utility Energy Efficiency

    Broader source: Energy.gov [DOE]

    This webinar highlights state mandates from throughout the country, and how they’ve influenced utility industrial energy efficiency programs.

  5. Utility and infrastructure needs for private tank waste processing

    SciTech Connect (OSTI)

    Reynolds, B.A.

    1996-05-01T23:59:59.000Z

    This document supports the development of the Draft TWRS Privatization RFP. The document provides summaries of a wide variety of utility infrastructure and support services that are available at the Hanford Site. The needs of the privatization contractors are estimated and compared to the existing infrastructure. Recommendations are presented on the preferred and alternate routes of supplying the identifies requirements.

  6. Federal Utility Partnership Working Group Spring 2009 Meeting Welcome

    Broader source: Energy.gov [DOE]

    Presentation—given at the Spring 2009 Federal Utility Partnership Working Group (FUPWG) meeting—covers the Federal Energy Management Program (FEMP) mission and services; Energy Independence and Security Act (EISA) Section 432 guidance; and American Reinvestment and Recovery Act (ARRA).

  7. Utility spot pricing study : Wisconsin

    E-Print Network [OSTI]

    Caramanis, Michael C.

    1982-01-01T23:59:59.000Z

    Spot pricing covers a range of electric utility pricing structures which relate the marginal costs of electric generation to the prices seen by utility customers. At the shortest time frames prices change every five ...

  8. Development of stripper options for FRIB

    SciTech Connect (OSTI)

    Marti, F.; Hershcovitch, A.; Momozaki, Y.; Nolen, J.; Reed, C.; Thieberger, P.

    2010-09-12T23:59:59.000Z

    The US Department of Energy Facility for Rare Isotope Beams (FRIB) at Michigan State University includes a heavy ion superconducting linac capable of accelerating all ions up to uranium with energies higher than 200 MeV/u and beam power up to 400 kW. To achieve these goals with present ion source performance it is necessary to accelerate simultaneously two charge states of uranium from the ion source in the first section of the linac. At an energy of approximately 16.5 MeV/u it is planned to strip the uranium beam to reduce the voltage needed in the rest of the linac to achieve the final energy. Up to five different charge states are planned to be accelerated simultaneously after the stripper. The design of the stripper is a challenging problem due to the high power deposited (approximately 0.7 kW) in the stripper media by the beam in a small spot. To assure success of the project we have established a research and development program that includes several options: carbon or diamond foils, liquid lithium films, gas strippers and plasma strippers. We present in this paper the status of the different options.

  9. Cementitious waste option scoping study report

    SciTech Connect (OSTI)

    Lee, A.E.; Taylor, D.D.

    1998-02-01T23:59:59.000Z

    A Settlement Agreement between the Department of Energy (DOE) and the State of Idaho mandates that all high-level radioactive waste (HLW) now stored at the Idaho Chemical Processing Plant (ICPP) on the Idaho National Engineering and Environmental Laboratory (INEEL) will be treated so that it is ready to be moved out of Idaho for disposal by a target date of 2035. This study investigates the nonseparations Cementitious Waste Option (CWO) as a means to achieve this goal. Under this option all liquid sodium-bearing waste (SBW) and existing HLW calcine would be recalcined with sucrose, grouted, canisterized, and interim stored as a mixed-HLW for eventual preparation and shipment off-Site for disposal. The CWO waste would be transported to a Greater Confinement Disposal Facility (GCDF) located in the southwestern desert of the US on the Nevada Test Site (NTS). All transport preparation, shipment, and disposal facility activities are beyond the scope of this study. CWO waste processing, packaging, and interim storage would occur over a 5-year period between 2013 and 2017. Waste transport and disposal would occur during the same time period.

  10. Real options : a way to deal with market uncertainty in real estate development projects

    E-Print Network [OSTI]

    Kim, Kyungwon

    2008-01-01T23:59:59.000Z

    The practice of applying options theory to real estate investments has only recently begun. In particular, options in real estate are called "real options." Real options add value to real estate development projects by ...

  11. Utilization FLY ASH INFORMATION FROM

    E-Print Network [OSTI]

    Wisconsin-Milwaukee, University of

    , quarries, and pits (34%), 6% for temporary stockpile, and 7% landfilled. Fly Ash In Europe, the utilization

  12. Gnie informatique / Computer Engineering Option gestion et entrepreneuriat en ingnierie / Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie informatique / Computer Engineering Option gestion et entrepreneuriat en ingénierie / Course selection grid 2010-03-16 Bien que les cotes de cours apparaissent dans les deux langues (anglais GNG4170/4570 Cours de gestion au choix/ Management Elective Cours technique au choix/ Technical

  13. Gnie informatique / Computer Engineering Option gestion et entrepreneuriat en ingnierie / Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie informatique / Computer Engineering Option gestion et entrepreneuriat en ingénierie / Course selection grid 2013-03-22 Bien que les cotes de cours apparaissent dans les deux langues (anglais GNG4170/4570 Cours de gestion au choix/ Management Elective Cours technique au choix/ Technical

  14. Gnie informatique / Computer Engineering Option gestion et entrepreneuriat en ingnierie / Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie informatique / Computer Engineering Option gestion et entrepreneuriat en ingénierie / Course selection grid 2011-11-03 Bien que les cotes de cours apparaissent dans les deux langues (anglais GNG4170/4570 Cours de gestion au choix/ Management Elective Cours technique au choix/ Technical

  15. Gnie informatique / Computer Engineering Option gestion et entrepreneuriat en ingnierie / Engineering Management and Entrepreneurship Option

    E-Print Network [OSTI]

    Petriu, Emil M.

    Génie informatique / Computer Engineering Option gestion et entrepreneuriat en ingénierie / Course selection grid 2010-12-01 Bien que les cotes de cours apparaissent dans les deux langues (anglais GNG4170/4570 Cours de gestion au choix/ Management Elective Cours technique au choix/ Technical

  16. DEGREES, MAJORS, AND OPTIONS This is a list of the degrees, majors, and options

    E-Print Network [OSTI]

    Wisconsin at Madison, University of

    &S) Asian Studies* (L&S) Astronomy - Physics* (L&S) Atmospheric and Oceanic Sciences* (L&S) Biochemistry* (L to the degree are shown. These degree titles appear on the student's transcript and on the diploma. The major titles and any applicable options appear only on the student's transcript. The school

  17. Subjective expected utility without preferences$

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Utility (henceforth model SEUc, the subscript c being $ Authors are listed alphabetically. The workSubjective expected utility without preferences$ Denis Bouyssoua,b , Thierry Marchantc a CNRS of subjective expected utility based on prim- itives only involving the fact that an act can be judged either

  18. Dispute Resolution Process Utility Owner

    E-Print Network [OSTI]

    Minnesota, University of

    State One Call (GSOC) for "Design Call" Provide "as-builts", marked plans or field locates MnDOT Utility? Underground Utility? Contact Minnesota Office of Pipeline Safety Minnesota Office of Pipeline Safety Step 1 - Utility Identification for Construction Investigate and take appropriate action up to and including

  19. CONSORTIUM FOR CLEAN COAL UTILIZATION

    E-Print Network [OSTI]

    Subramanian, Venkat

    CONSORTIUM FOR CLEAN COAL UTILIZATION Call for Proposals Date of Issue: July 29, 2013 The Consortium for Clean Coal Utilization (CCCU) at Washington University in St. Louis was established in January of Clean Coal Utilization. The format may be a conference or workshop, or a seminar given by a leading

  20. Utility Demand Side Management- DSM Lessons: Experience is the Toughest Teacher

    E-Print Network [OSTI]

    Gilbert, S. M.

    Most utilities first became actively involved with energy conservation in the early 1980s with the federally mandated Residential Conservation Service (RCS) program. Legislation mandating a similar effort directed toward commercial and apartment...