  1. Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the Energy Policy Act of 2005 (EPACT 2005) -List of Covered Electric Utilities - 2006 Public Utility Regulatory ...

  2. Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the Energy Policy Act of 2005 (EPACT 2005) - List of Covered Electric Utilities. Public Utility Regulatory ...

  3. Texas - PUC - Public Utility Regulatory Act | Open Energy Information

    Open Energy Info (EERE)

    Act (2011). Retrieved from "http:en.openei.orgwindex.php?titleTexas-PUC-PublicUtilityRegulatoryAct&oldid800942" Feedback Contact needs updating Image needs...

  4. Public Utility Regulatory Act - Texas | Open Energy Information

    Open Energy Info (EERE)

    http:crossref.org Citation Retrieved from "http:en.openei.orgwindex.php?titlePublicUtilityRegulatoryAct-Texas&oldid792167" Feedback Contact needs updating...

  5. Public Utility Regulatory Policies Act of 1978 (PURPA)

    Broader source: Energy.gov [DOE]

    The Energy Policy Act of 2005 (EPACT 2005) Subtitle E contains three sections (secs. 1251, 1252, and 1254) that add additional “States-must-consider” standards to the Public Utility Regulatory Policies Act of 1978 (PURPA). Specifically, EPACT 2005 adds five new Federal standards to PURPA Section 111(d).

  6. Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Policy Act of 2005 (EPACT 2005) - List of Covered Electric Utilities. | Department of Energy Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the Energy Policy Act of 2005 (EPACT 2005) - List of Covered Electric Utilities. Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the Energy Policy Act of 2005 (EPACT 2005) - List of Covered Electric Utilities. Under Title I of the Public Utility Regulatory Policies Act of 1978 (PURPA), the U.S.

  7. Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Policy Act of 2005 (EPACT 2005) -List of Covered Electric Utilities - 2006 | Department of Energy Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the Energy Policy Act of 2005 (EPACT 2005) -List of Covered Electric Utilities - 2006 Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the Energy Policy Act of 2005 (EPACT 2005) -List of Covered Electric Utilities - 2006 Under Title I of the Public Utility Regulatory Policies Act of 1978 (PURPA), the

  8. AS 42.05, Alaska Public Utilities Regulatory Act | Open Energy...

    Open Energy Info (EERE)

    Act (1999). Retrieved from "http:en.openei.orgwindex.php?titleAS42.05,AlaskaPublicUtilitiesRegulatoryAct&oldid801052" Feedback Contact needs updating Image...

  9. AS 42.05.990, Alaska Public Utilities Regulatory Act Definitions...

    Open Energy Info (EERE)

    AS 42.05.990, Alaska Public Utilities Regulatory Act Definitions Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: AS 42.05.990,...

  10. AS 42.05.711, Alaska Public Utilities Regulatory Act Exemptions...

    Open Energy Info (EERE)

    AS 42.05.711, Alaska Public Utilities Regulatory Act Exemptions Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: AS 42.05.711,...

  11. Public Utility Regulatory Policies Act of 1978 | Open Energy...

    Open Energy Info (EERE)

    is to encourage: (1) conservation of energy supplied by electric utilities; (2) the optimization of the efficiency of use of facilities and resources by electric utilities; and (3)...

  12. Public Utility Regulatory Policies Act of 1978. Annual report to Congress

    SciTech Connect (OSTI)

    None,

    1980-05-01

    Titles I and III of the Public Utility Regulatory Policies Act of 1978 (PURPA) establish retail regulatory policies for electric and natural gas utilities, respectively, aimed at achieving three purposes: conservation of energy supplied by electric and gas utilities; efficiency in the use of facilities and resources by these utilities; equitable rates to electricity and natural gas consumers. PURPA also continues the pilot utility implementation program, authorized under Title II of the Energy Conservation and Production ACT (ECPA), to encourage adoption of cost-based rates and efficient energy-management practices. The purpose of this report is twofold: (1) to summarize and analyze the progress that state regulatory authorities and certain nonregulated utilities have made in their consideration of the PURPA standards; and (2) to summarize the Department of Energy (DOE) activities relating to PURPA and ECPA. The report provides a broad overview and assessment of the status of electric and gas regulation nationwide, and thus helps provide the basis for congressional and DOE actions targeted on the utility industry to address pressing national energy problems.

  13. Economic and regulatory aspects of cogeneration: the implementation of Section 210 of the Public Utility Regulatory Policies Act of 1978

    SciTech Connect (OSTI)

    Vincent, J.W.

    1982-01-01

    In February of 1980 the Federal Energy Regulatory Commission (FERC) promulgated a set of rules that were to commence the implementation process of Section 210 of the Public Utility Regulatory Policies Act of 1978 (PURPA). Of particular interest to economists are the pricing provisions in the rules that pertain to integrating dispersed sources of electric power generation into conventional electric utility systems. The full avoided cost pricing provision couples a utility mandate to purchase power from qualified dispersed facilities (cogenerators, wind power, small hydro facilities, etc., hereafter denoted QFs) with the requirement that the price the utility pays for such purchases be equal to the full extent of the cost it avoids by not generating the power itself. The simultaneous purchase and sale billing scheme requires a utility to purchase the gross power output of a QF at the full avoided cost rate and simultaneously sell back to the QF its power requirement on the applicable retail tariff. Theoretical investigation of these two provisions reveals that, properly defined, they are consistent with improving economic signals with respect to electricity generation.

  14. Rules implementing Sections 201 and 210 of the Public Utility Regulatory Policies Act of 1978: a regulatory history

    SciTech Connect (OSTI)

    Danziger, R.N.; Caples, P.W.; Huning, J.R.

    1980-09-15

    An analysis is made of the rules implementing Sections 201 and 210 of the Public Utility Regulatory Policies Act of 1978 (PURPA). The act provides that utilities must purchase power from qualifying producers of electricity at nondiscriminatory rates, and it exempts private generators from virtually all state and Federal utility regulations. Most of the analysis presented is taken from the perspective of photovoltaics (PV) and solar thermal electric point-focusing distributed receivers (pfdr). It is felt, however, that the analysis is applicable both to cogeneration and other emerging technologies. Chapters presented are: The FERC Response to Oral Comments on the Proposed Rules Implementing Sections 201 and 210 of PURPA; Additional Changes Made or Not Made That Were Addressed in Other Than Oral Testimony; View on the Proposed Rules Implementing Sections 201 and 210 of PURPA; Response to Comments on the Proposed 201 and 210 Rules; and Summary Analysis of the Environmental Assessment of the Rules. Pertinent reference material is provided in the Appendices, including the text of the rules. (MCW)

  15. The Public Utilities Regulatory Policy Act (PURPA) and US Geothermal Industry: Current controversies and trends in federal and state implementation

    SciTech Connect (OSTI)

    Not Available

    1988-09-01

    This report is an analysis of the issues confronting US energy policymakers and the US geothermal industry as the result of the implementation and interpretation of the 1978 Public Utility Regulatory Policies Act, commonly known as PURPA. It seeks to answer four sets of questions about PURPA: (1) What has the existence of PURPA meant to the US geothermal industry. (2) How has the interpretation of PURPA evolved over the past decade. (3) What particular portions of PURPA rule making have been most crucial to the growth and development of the geothermal industry. (4) What aspects of PURPA have been most troubling to utilities purchasing or developing geothermal energy.

  16. Public Utility Regulatory Policies Act of 1978: Natural Gas Rate Design Study

    SciTech Connect (OSTI)

    1980-05-01

    First, the comments on May 3, 1979 Notice of Inquiry of DOE relating to the Gas Utility Rate Design Study Required by Section 306 of PURPA are presented. Then, comments on the following are included: (1) ICF Gas Utility Model, Gas Utility Model Data Outputs, Scenario Design; (2) Interim Model Development Report with Example Case Illustrations; (3) Interim Report on Simulation of Seven Rate Forms; (4) Methodology for Assessing the Impacts of Alternative Rate Designs on Industrial Energy Use; (5) Simulation of Marginal-Cost-Based Natural Gas Rates; and (6) Preliminary Discussion Draft of the Gas Rate Design Study. Among the most frequent comments expressed were the following: (a) the public should be given the opportunity to review the final report prior to its submission to Congress; (b) results based on a single computer model of only four hypothetical utility situations cannot be used for policy-making purposes for individual companies or the entire gas industry; (c) there has been an unobjective treatment of traditional and economic cost rate structures; the practical difficulties and potential detrimental consequences of economic cost rates are not fully disclosed; and (d) it is erroneous to assume that end users, particularly residential customers, are influenced by price signals in the rate structure, as opposed to the total bill.

  17. "List of Covered Electric Utilities" under the Public Utility Regulatory

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policies Act of 1978 (PURPA) - 2009 | Department of Energy 9 "List of Covered Electric Utilities" under the Public Utility Regulatory Policies Act of 1978 (PURPA) - 2009 Under Title I, Sec. 102(c) of the Public Utility Regulatory Policies Act of 1978 (PURPA), the U.S. Department of Energy (DOE) is required to publish a list identifying each electric utility "List of Covered Electric Utilities" under the Public Utility Regulatory Policies Act of 1978 (PURPA) (2.43 MB

  18. Small Business Regulatory Enforcement Fairness Act Information

    Broader source: Energy.gov [DOE]

    Small Business Regulatory Enforcement Fairness Act of 1996 (SBREFA) OSDBU is a resource for small businesses seeking information concerning the rules and regulations regarding all federal agencies and their relationships with the small business community.

  19. Comments from The National Association of Regulatory Utility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    from The National Association of Regulatory Utility Commissioners (NARUC) on the Smart Grid RFI Comments from The National Association of Regulatory Utility Commissioners (NARUC) ...

  20. California Public Utilities Act | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: California Public Utilities ActLegal Published NA Year Signed or Took Effect 2014 Legal...

  1. Fact Sheet: DOE/National Association of Regulatory Utility Commissione...

    Energy Savers [EERE]

    DOENational Association of Regulatory Utility Commissioners Natural Gas Infrastructure ... Commissioners (NARUC) to encourage investments in infrastructure modernization to ...

  2. Hydropower Regulatory Efficiency Act of 2013 | Open Energy Information

    Open Energy Info (EERE)

    navigation, search OpenEI Reference LibraryAdd to library Legal Document- BillBill: Hydropower Regulatory Efficiency Act of 2013Legal Abstract Amends statutory provisions related...

  3. Comments from The National Association of Regulatory Utility Commissioners

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (NARUC) on the Smart Grid RFI | Department of Energy from The National Association of Regulatory Utility Commissioners (NARUC) on the Smart Grid RFI Comments from The National Association of Regulatory Utility Commissioners (NARUC) on the Smart Grid RFI The National Association of Regulatory Utility Commissioners (NARUC) appreciates the opportunity to provide comments to the Department of Energy (DOE) on this Request for Information (RFI) regarding the policy and logistical challenges of the

  4. Fact Sheet: DOE/National Association of Regulatory Utility Commissione...

    Broader source: Energy.gov (indexed) [DOE]

    Fact Sheet: DOENational Association of Regulatory Utility Commissioners Natural Gas ... will work with NARUC to encourage investments in infrastructure modernization to ...

  5. Fact Sheet: DOE/National Association of Regulatory Utility Commissioners

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Natural Gas Infrastructure Modernization Partnership | Department of Energy DOE/National Association of Regulatory Utility Commissioners Natural Gas Infrastructure Modernization Partnership Fact Sheet: DOE/National Association of Regulatory Utility Commissioners Natural Gas Infrastructure Modernization Partnership The following fact sheet outlines one of the Department of Energy's series of actions, partnerships, and stakeholder commitments to help modernize the nation¹s natural gas

  6. "List of Covered Electric Utilities" under the Public Utility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon "List of Covered Electric Utilities" under the Public Utility Regulatory Policies ... Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the Energy Policy ...

  7. "List of Covered Electric Utilities" under the Public Utility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Revised "List of Covered Electric Utilities" under the Public Utility Regulatory Policies Act of 1978 (PURPA) - 2006 Revised Under Title I of the Public Utility Regulatory...

  8. "List of Covered Electric Utilities" under the Public Utility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    "List of Covered Electric Utilities" under the Public Utility Regulatory Policies Act of 1978 (PURPA) - 2009 Under Title I, Sec. 102(c) of the Public Utility Regulatory Policies ...

  9. Cal. Pub. Util. Code 201-248 - Public Utilities Act | Open...

    Open Energy Info (EERE)

    from "http:en.openei.orgwindex.php?titleCal.Pub.Util.Code201-248-PublicUtilitiesAct&oldid801671" Feedback Contact needs updating Image needs updating...

  10. Confidential data in a competitive utility environment: A regulatory perspective

    SciTech Connect (OSTI)

    Vine, E.

    1996-08-01

    Historically, the electric utility industry has been regarded as one of the most open industries in the United States in sharing information but their reputation is being challenged by competitive energy providers, the general public, regulators, and other stakeholders. As the prospect of competition among electricity power providers has increased in recent years, many utilities have been requesting that the data they submit to their utility regulatory commissions remain confidential. Withholding utility information from the public is likely to have serious and significant policy implications with respect to: (1) consumer education, the pursuit of truth, mutual respect among parties, and social cooperation; (2) the creation of a fair market for competitive energy services; (3) the regulatory balance; (4) regional and national assessments of energy-savings opportunities; (5) research and development; and (6) evaluations of utility programs, plans, and policies. In a telephone survey of all public utility commissions (PUCs) that regulate electric and gas utilities in the U.S., we found that almost all PUCs have received requests from utility companies for data to be filed as confidential, and confidential data filings appear to have increased (both in scope and in frequency) in those states where utility restructuring is being actively discussed. The most common types of data submitted as confidential by utilities dealt with specific customer data, market data, avoided costs, and utility costs.

  11. Fact Sheet: DOE/National Association of Regulatory Utility Commissioners

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fact Sheet: DOE/National Association of Regulatory Utility Commissioners Natural Gas Infrastructure Modernization Partnership Summary: Building on many years of productive collaboration, the U.S. Department of Energy will work with NARUC to encourage investments in infrastructure modernization to enhance pipeline safety, efficiency and deliverability. State Public Utility Commissions serve a leading role in ensuring continued investments are made to secure safe, reliable, affordable and robust

  12. Public Utility Holding Company Act of 1935: 1935-1992

    Reports and Publications (EIA)

    1993-01-01

    This report provides an economic and legislative history and analysis of the Public Utilities Holding Company Act (PUHCA) of 1935. This Act was substantially amended for the first time in 1992 by passage of the Energy Policy Act (EPACT). The report also includes a discussion of the issues which led to the amendment of PUHCA and projections of the impact of these changes on the electric industry.

  13. Public Utility Holding Company Act of 1935: 1935--1992

    SciTech Connect (OSTI)

    Not Available

    1993-01-15

    This report provides an economic and legislative history and analysis of the Public Utilities Holding Company Act (PUHCA) of 1935. This Act was substantially amended for the first time in 1992 by passage of the Energy Policy Act (EPACT). The report also includes a discussion of the issues which led to the amendment of PUHCA and projections of the impact of these changes on the electric industry. The report should be of use to Federal and State regulators, trade associations, electric utilities, independent power producers, as well as decision-makers in Congress and the Administration.

  14. On the Path to SunShot. Utility Regulatory and Business Model...

    Office of Scientific and Technical Information (OSTI)

    Utility Regulatory and Business Model Reforms for Addressing the Financial Impacts of Distributed Solar on Utilities Net-energy metering (NEM) has helped drive the rapid growth of ...

  15. The clean water act -- (Federal Water Pollution Control Act), what it means to utilities

    SciTech Connect (OSTI)

    Talt, L.A.

    1996-10-01

    Departing from previous policy, in August 1993 the USEPA`s Water Office recommended that the agency regulate a proposed electric power plant`s cooling pond as a water of the US. At issue was a proposal by Florida Power corp. to build a new electric power plant in Polk County, Florida. A 2,600 acre cooling pond to collect heated and discharged water was included in the proposal. Region 4 USEPA staff asked USEPA Headquarters in Washington, DC to decide whether the pond was exempt from the CWA or a water of the US. The pond could be a habitat for migratory birds according to a memo prepared by Region 4 staff. The USEPA Water Office used the presence of migratory birds to claim a nexus to interstate commerce and therefore concluded that the pond should be regulated under the CWA. Electric power industry proponents have argued that an overly expansive definition of waters of the US may result in any new power plant being required to construct cooling towers. Cooling towers are said to be a more expensive and wasteful method to cool heated water. Region 4 ultimately recanted its earlier position after considerable discussions with various other Environmental Protection Agency offices and, no doubt industry pressure. Florida Power Corp. was not required to obtain an NPDES permit for the cooling pond. The lesson of Florida Power Corp. is that the regulatory environment for utilities can be uncertain under the Clean Water Act even in the face of a relatively straightforward exemption from regulation.

  16. Public Utility Regulatory Policies Act of 1978 (PURPA) | Department...

    Energy Savers [EERE]

    Sec. 1251 for details) (14) TIME-BASED METERING AND COMMUNICATIONS (see EPACT 2005 Sec. ... for details) (16) (sic) CONSIDERATION OF SMART GRID INVESTMENTS (see EISA 2007 Sec. ...

  17. NMS 62-3 New Mexico Public Utility Act | Open Energy Information

    Open Energy Info (EERE)

    62-3 New Mexico Public Utility Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: NMS 62-3 New Mexico Public Utility ActLegal...

  18. Final Report -Regulatory and Utility Solutions to Advance SunShot

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Initiative Goals | Department of Energy Regulatory and Utility Solutions to Advance SunShot Initiative Goals Final Report -Regulatory and Utility Solutions to Advance SunShot Initiative Goals Awardee: Interstate Renewable Energy Council (IREC) Location: Latham, NY Subprogram: Soft Costs Funding Program: Solar Projects to Reduce Market Barriers and Non-Hardware Balance of System Costs IREC's work over the past three years under the United States Department of Energy SunShot award

  19. A Framework for Organizing Current and Future Electric Utility Regulatory and Business Models

    Broader source: Energy.gov [DOE]

    In this report, we will present a descriptive and organizational framework for incremental and fundamental changes to regulatory and utility business models in the context of clean energy public policy goals. We will also discuss the regulated utility's role in providing value-added services that relate to distributed energy resources, identify the "openness" of customer information and utility networks necessary to facilitate change, and discuss the relative risks, and the shifting of risks, for utilities and customers.

  20. N.R.S. 704.820 - Utility Environmental Protection Act | Open...

    Open Energy Info (EERE)

    4.820 - Utility Environmental Protection Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: N.R.S. 704.820 - Utility...

  1. Utah - UC 54-14 - Utility Facility Review Board Act | Open Energy...

    Open Energy Info (EERE)

    Utah - UC 54-14 - Utility Facility Review Board Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Utah - UC 54-14 - Utility...

  2. On the Path to SunShot: Utility Regulatory and Business Model Reforms for Addressing the Financial Impacts of Distributed Solar on Utilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    670 LBNL-1004371 Utility Regulatory and Business Model Reforms for Addressing the Financial Impacts of Distributed Solar on Utilities Cover photos (clockwise from top left): Solar Design Associates, Inc., NREL 08563; SolarReserve; Dennis Schroeder, NREL 30551; and iStock 000075760625 On the Path to SunShot: Utility Regulatory and Business Model Reforms for Addressing the Financial Impacts of Distributed Solar on Utilities Galen Barbose 1 , John Miller 2 , Ben Sigrin 2 , Emerson Reiter 2 ,

  3. A Framework for Organizing Current and Future Electric Utility Regulatory and Business Models

    SciTech Connect (OSTI)

    Satchwell, Andrew; Cappers, Peter; Schwartz, Lisa C.; Fadrhonc, Emily Martin

    2015-06-01

    Many regulators, utilities, customer groups, and other stakeholders are reevaluating existing regulatory models and the roles and financial implications for electric utilities in the context of today’s environment of increasing distributed energy resource (DER) penetrations, forecasts of significant T&D investment, and relatively flat or negative utility sales growth. When this is coupled with predictions about fewer grid-connected customers (i.e., customer defection), there is growing concern about the potential for serious negative impacts on the regulated utility business model. Among states engaged in these issues, the range of topics under consideration is broad. Most of these states are considering whether approaches that have been applied historically to mitigate the impacts of previous “disruptions” to the regulated utility business model (e.g., energy efficiency) as well as to align utility financial interests with increased adoption of such “disruptive technologies” (e.g., shareholder incentive mechanisms, lost revenue mechanisms) are appropriate and effective in the present context. A handful of states are presently considering more fundamental changes to regulatory models and the role of regulated utilities in the ownership, management, and operation of electric delivery systems (e.g., New York “Reforming the Energy Vision” proceeding).

  4. Managing Carbon Regulatory Risk in Utility Resource Planning: Current Practices in the Western United States

    SciTech Connect (OSTI)

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-07-11

    Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. As such, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by fifteen electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without Federal climate regulation in the U.S., the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of U.S. electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations.

  5. Managing Carbon Regulatory Risk in Utility Resource Planning:Current Practices in the Western United States

    SciTech Connect (OSTI)

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-05-16

    Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. Assuch, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by fifteen electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without Federal climate regulation in the U.S., the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of U.S. electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations

  6. Techniques of analyzing the impacts of certain electric-utility ratemaking and regulatory-policy concepts. Bibliography

    SciTech Connect (OSTI)

    1980-08-01

    This bibliography provides documentation for use by state public utility commissions and major nonregulated utilities in evaluating the applicability of a wide range of electric utility rate design and regulatory concepts in light of certain regulatory objectives. Part I, Utility Regulatory Objectives, contains 2084 citations on conservation of energy and capital; efficient use of facilities and resources; and equitable rates to electricity consumers. Part II, Rate Design Concepts, contains 1238 citations on time-of-day rates; seasonally-varying rates; cost-of-service rates; interruptible rates (including the accompanying use of load management techniques); declining block rates; and lifeline rates. Part III, Regulatory Concepts, contains 1282 references on restrictions on master metering; procedures for review of automatic adjustment clauses; prohibitions of rate or regulatory discrimination against solar, wind, or other small energy systems; treatment of advertising expenses; and procedures to protect ratepayers from abrupt termination of service.

  7. "List of Covered Electric Utilities" under the Public Utility

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulatory Policies Act of 1978 (PURPA) - 2006 Revised | Department of Energy 6 Revised "List of Covered Electric Utilities" under the Public Utility Regulatory Policies Act of 1978 (PURPA) - 2006 Revised Under Title I of the Public Utility Regulatory Policies Act of 1978 (PURPA), the U.S. Department of Energy (DOE) is required to publish a list identifying each electric utility. "List of Covered Electric Utilities" under the Public Utility Regulatory Policies Act of 1978

  8. "List of Covered Electric Utilities" under the Public Utility

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulatory Policies Act of 1978 (PURPA) - 2008 | Department of Energy 8 "List of Covered Electric Utilities" under the Public Utility Regulatory Policies Act of 1978 (PURPA) - 2008 Under Title I of the Public Utility Regulatory Policies Act of 1978 (PURPA), the U.S. Department of Energy (DOE) is required to publish a list identifying each electric utility. "List of Covered Electric Utilities" under the Public Utility Regulatory Policies Act of 1978 (PURPA) (52.14 KB) More

  9. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Texas. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities in Texas is generally vested in the Public Utilities Commission. The Commission is comprised of three members appointed by the governor, with the advice of at least two-thirds of the senate, for a six-year term. Prior to the passage of the Texas Public Utility Regulatory Act (PURA) in 1975, the power to regulate public utilities was vested almost exclusively in municipalities. Under PURA, municipalities retain exclusive original jurisdiction over all electric, water, and sewer utilities within the municipality. PURA provides that all regulations pertaining to public utilities promulgated by local regulatory agencies remain in effect unless they are superceded by Commission rules. The municipality's governing body is required to exercise its regulatory authority under rules and standards consistent with those promulgated by the Commission. The Commission has exclusive appellate jurisdiction to review orders and ordinances of regulatory municipalities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  10. Reading the Tea Leaves: How Utilities in the West Are Managing Carbon Regulatory Risk in their Resource Plans

    SciTech Connect (OSTI)

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-02-01

    The long economic lifetime and development lead-time of many electric infrastructure investments requires that utility resource planning consider potential costs and risks over a lengthy time horizon. One long-term -- and potentially far-reaching -- risk currently facing the electricity industry is the uncertain cost of future carbon dioxide (CO2) regulations. Recognizing the importance of this issue, many utilities (sometimes spurred by state regulatory requirements) are beginning to actively assess carbon regulatory risk within their resource planning processes, and to evaluate options for mitigating that risk. However, given the relatively recent emergence of this issue and the rapidly changing political landscape, methods and assumptions used to analyze carbon regulatory risk, and the impact of this analysis on the selection of a preferred resource portfolio, vary considerably across utilities. In this study, we examine the treatment of carbon regulatory risk in utility resource planning, through a comparison of the most-recent resource plans filed by fifteen investor-owned and publicly-owned utilities in the Western U.S. Together, these utilities account for approximately 60percent of retail electricity sales in the West, and cover nine of eleven Western states. This report has two related elements. First, we compare and assess utilities' approaches to addressing key analytical issues that arise when considering the risk of future carbon regulations. Second, we summarize the composition and carbon intensity of the preferred resource portfolios selected by these fifteen utilities and compare them to potential CO2 emission benchmark levels.

  11. Financial constraints in capacity planning: a national utility regulatory model (NUREG). Volume II of III: user's guide. Final report

    SciTech Connect (OSTI)

    Not Available

    1981-10-29

    This volume is a User's Guide to the National Utility Regulatory Model (NUREG) and its implementation of the National Coal Model. This is the second of three volumes provided by ICF under contract number DEAC-01-79EI-10579. These three volumes are: a manual describing the NUREG methodology; a users guide; and a description of the software. This manual provides a brief introduction to the National Utility Regulation Model, describes the various programs that comprise the National Utility Regulatory Model, gives sample input files, and provides information needed to run the model.

  12. Interactions Between Energy Efficiecy Programs Funded Under Recover Act and Utility Customer-funded Energy Efficiency Programs

    Broader source: Energy.gov [DOE]

    This webinar covered utility customer-funded and Recovery Act-funded energy efficiency programs, results of analysis in 12 case study states, and case study examples.

  13. Techniques for analyzing the impacts of certain electric-utility ratemaking and regulatory-policy concepts. Regulatory laws and policies. [State by state

    SciTech Connect (OSTI)

    1980-08-01

    This report is a legal study prepared to provide a review of the substantive and procedural laws of each regulatory jurisdiction that may affect implementation of the PURPA standards, and to summarize the current state of consideration and implementation of policies and rate designs similar or identical to the PURPA standards by state regulatory agencies and nonregulated utilities. This report is divided into three sections. The first section, the Introduction, summarizes the standards promulgated by PURPA and the results of the legal study. The second section, State Regulatory Law and Procedure, summarizes for each state or other ratemaking jurisdiction: (1) general constitutional and statutory provisions affecting utility rates and conditions of service; (2) specific laws or decisions affecting policy or rate design issues covered by PURPA standards; and (3) statutes and decisions governing administrative procedures, including judicial review. A chart showing actions taken on the policy and rate design issues addressed by PURPA is also included for each jurisdiction, and citations to relevant authorities are presented for each standard. State statutes or decisions that specifically define a state standard similar or identical to a PURPA standard, or that refer to one of the three PURPA objectives, are noted. The third section, Nonregulated Electric Utilities, summarizes information available on nonregulated utilities, i.e., publicly or cooperatively owned utilities which are specifically exempted from state regulation by state law.

  14. Synergies and conflicts in multimedia pollution control related to utility compliance with Title IV of the Clean Air Act Amendments of 1990

    SciTech Connect (OSTI)

    Bailey, K.A.; Loeb, A.P.; Formento, J.W.; South, D.W.

    1994-01-01

    Most analyses of utility strategies for meeting Title IV requirements in the Clean Air Act Amendments of 1990 have focused on factors relating directly to utilities` sulfur dioxide control costs; however, there are a number of additional environmental requirements that utilities must meet at the same time they comply with the acid rain program. To illuminate the potential synergies and conflicts that these other regulatory mandates may have in connection with the acid rain program, it is necessary to conduct a thorough, simultaneous examination of the various programs. This report (1) reviews the environmental mandates that utilities must plant to meet in the next decade concurrently with those of the acid rain program, (2) evaluates the technologies that utilities may select to meet these requirements, (3) reviews the impacts of public utility regulation on the acid rain program, and (4) analyzes the interactions among the various programs for potential synergies and conflicts. Generally, this report finds that the lack of coordination among current and future regulatory programs may result in higher compliance costs than necessary. Failure to take advantage of cost-effective synergies and incremental compliance planning will increase control costs and reduce environmental benefits.

  15. Nuclear Regulatory Commission Authorization Act for fiscal years 1994 and 1995. Introduced in the Senate of the United States, One Hundred Third Congress, Second Session, July 25, 1994

    SciTech Connect (OSTI)

    1994-12-31

    The report addresses S. 2313 a bill to authorize appropriations for the Nuclear Regulatory Commission (NRC) for fiscal years 1994 and 1995. Congressional oversight of the Federal independent regulatory agencies is a fundamental aspect of the Federal regulatory process to ensure that their responsibilities are properly implemented. The bill amends the Atomic Energy Act of 1954 to strengthen and clarify NRC;s authority.

  16. Nevada Sample Application for Permit Under Utility Environmental...

    Open Energy Info (EERE)

    Sample Application for Permit Under Utility Environmental Protection Act Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  17. File:Public Utility Regulatory Act - Texas.pdf | Open Energy...

    Open Energy Info (EERE)

    27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85...

  18. Interactions between Energy Efficiency Programs funded under the Recovery Act and Utility Customer-Funded Energy Efficiency Programs

    SciTech Connect (OSTI)

    Goldman, Charles A.; Stuart, Elizabeth; Hoffman, Ian; Fuller, Merrian C.; Billingsley, Megan A.

    2011-02-25

    efficiency programs administered by state energy offices: the State Energy Program (SEP) formula grants, the portion of Energy Efficiency and Conservation Block Grant (EECBG) formula funds administered directly by states, and the State Energy Efficient Appliance Rebate Program (SEEARP). Since these ARRA programs devote significant monies to energy efficiency and serve similar markets as utility customer-funded programs, there are frequent interactions between programs. We exclude the DOE low-income weatherization program and EECBG funding awarded directly to the over 2,200 cities, counties and tribes from our study to keep its scope manageable. We summarize the energy efficiency program design and funding choices made by the 50 state energy offices, 5 territories and the District of Columbia. We then focus on the specific choices made in 12 case study states. These states were selected based on the level of utility customer program funding, diversity of program administrator models, and geographic diversity. Based on interviews with more than 80 energy efficiency actors in those 12 states, we draw observations about states strategies for use of Recovery Act funds. We examine interactions between ARRA programs and utility customer-funded energy efficiency programs in terms of program planning, program design and implementation, policy issues, and potential long-term impacts. We consider how the existing regulatory policy framework and energy efficiency programs in these 12 states may have impacted development of these selected ARRA programs. Finally, we summarize key trends and highlight issues that evaluators of these ARRA programs may want to examine in more depth in their process and impact evaluations.

  19. The Public Utility Holding Company Act: Is reform or repeal in the public interest?

    SciTech Connect (OSTI)

    Penn, D.W.

    1996-11-01

    One of the dangers in policy debates, especially those involving many complex and interrelated subjects, is that the debate will plunge into the depths of details to the exclusion of firmly establishing overarching logic and principles. Sometimes this is because it is extremely difficult for the human brain simultaneously to think of many things at many levels. Sometimes it is because that central logic is forgotten along the way or, worse, never in place to begin with. The policy debate on electricity industry restructuring is no exception. This danger of concentrating on the details and obscuring the central principles permeates the wide-ranging restructuring debates, and certainly has contaminated questions about the subissue of the Public Utility Holding Company Act (PUHCA).

  20. The use of information systems to transform utilities and regulatory commissions: The application of geographic information systems

    SciTech Connect (OSTI)

    Wirick, D.W.; Montgomery, G.E.; Wagman, D.C.; Spiers, J.

    1995-09-01

    One technology that can assist utilities remain financially viable in competitive markets and help utilities and regulators to better serve the public is information technology. Because geography is an important part of an electric, natural gas, telecommunications, or water utility, computer-based Geographic Information Systems (GIS) and related Automated Mapping/Facilities Management systems are emerging as core technologies for managing an ever-expanding variety of formerly manual or paper-based tasks. This report focuses on GIS as an example of the types of information systems that can be used by utilities and regulatory commissions. Chapter 2 provides general information about information systems and effects of information on organizations; Chapter 3 explores the conversion of an organization to an information-based one; Chapters 4 and 5 set out GIS as an example of the use of information technologies to transform the operations of utilities and commissions; Chapter 6 describes the use of GIS and other information systems for organizational reengineering efforts; and Chapter 7 examines the regulatory treatment of information systems.

  1. Final Report -Regulatory and Utility Solutions to Advance SunShot...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Market Barriers and Non-Hardware Balance of System Costs IREC's work over the past three years under the United States Department of Energy SunShot award "Regulatory and ...

  2. Collaborative Research: Metabolic Engineering of E. coli Sugar-Utilization Regulatory Systems for the Consumption of Plant Biomass Sugars.

    SciTech Connect (OSTI)

    Ramon Gonzalez; J. V. Shanks; K-Y. San .

    2006-03-31

    The overall objective of this project is to metabolically engineer the E. coli sugar-utilization regulatory systems (SURS) to utilize sugar mixtures obtained from plant biomass. Of particular relevance is the implementation of a metabolic engineering cycle aided by functional genomics and systems biology tools. Our findings will help in the establishment of a platform for the efficient production of fuels and chemicals from lignocellulosic sugars. Our research has improved the understanding of the role of SURS in regulating sugar utilization and several other cellular functions. For example, we discovered that Mlc, a global regulatory protein, regulates the utilization of xylose and demonstrated the existence of an important link between catabolite repression and respiratory/fermentative metabolism. The study of SURS mutants also revealed a connection between flagellar biosynthesis and catabolite repression. Several tools were also developed as part of this project. A novel tool (Elementary Network Decomposition, END) to help elucidate the network topology of regulatory systems was developed and its utility as a discovery tool was demonstrated by applying it to the SURS in E. coli. A novel method (and software) to estimate metabolic fluxes that uses labeling experiments and eliminates reliance on extracellular fluxes was also developed. Although not initially considered in the scope of this project, we have developed a novel and superior method for optimization of HPLC separation and applied it to the simultaneous quantification of different functionalities (sugars, organic acids, ethanol, etc.) present in our fermentation samples. Currently under development is a genetic network driven metabolic flux analysis framework to integrate transcriptional and flux data.

  3. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Ohio. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The Public Utilities Commission (PUCO) is a body created by the Ohio State legislature to administer the provisions of the Ohio Public Utilities Act. It is composed of three commissioners appointed by the governor with the advice and consent of the senate. Once appointed, a commissioner serves for a six-year period. The PUCO is vested with the power and jurisdiction to supervise and regulate public utilities and railroads... . The term public utility includes every corporation, company, co-partnership, person or association, their lessees, trustees, or receivers, as defined in the Ohio Code. Among the various services enumerated in the Code under the definition of public utility are an electric light company; a gas company; a pipeline company transporting gas, oil or coal; a waterworks company; a heating or cooling company. The power to regulate public utilities is shared by the PUCO and municipal governments. The municipal regulatory authority is derived from the Ohio Constitution, statutory provisions, and municipal franchising authority. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  4. Compliance problems of small utility systems with the Powerplant and Industrial Fuel Use Act of 1978: volume II - appendices

    SciTech Connect (OSTI)

    1981-01-01

    A study of the problems of compliance with the Powerplant and Industrial Fuel Use Act of 1978 experienced by electric utility systems which have a total generating capacity of less than 2000 MW is presented. This volume presents the following appendices: (A) case studies (Farmington, New Mexico; Lamar, Colorado; Dover, Delaware; Wolverine Electric Cooperative, Michigan; Central Telephone and Utilities, Kansas; Sierra Pacific Power Company, Nevada; Vero Beach, Florida; Lubbock, Texas; Western Farmers Cooperative, Oklahoma; and West Texas Utilities Company, Texas); (B) contacts and responses to study; (C) joint action legislation chart; (D) Texas Municipal Power Agency case study; (E) existing generating units jointly owned with small utilities; (F) future generating units jointly owned with small utilities; (G) Federal Register Notice of April 17, 1980, and letter of inquiry to utilities; (H) small utility responses; and (I) Section 744, PIFUA. (WHK)

  5. Examination of utility Phase 1 compliance choices and state reactions to Title IV of the Clean Air Act Amendments of 1990

    SciTech Connect (OSTI)

    Bailey, K.A.; Elliott, T.J.; Carlson, L.J.; South, D.W.

    1993-11-01

    Title IV (acid rain) of the Clean Air Act Amendments of 1990 is imposing new limitations on the emission of sulfur dioxide (SO{sub 2}) and nitrogen oxides (N{sub x}) from electric power plants. The act requires utilities to develop compliance plans to reduce these emissions, and indications are that these plans will dramatically alter traditional operating procedures. A key provision of the SO{sub 2} control program deaned in Title IV is the creation of a system of emission allowances, with utilities having the option of complying by adjusting system emissions and allowance holdings. A compilation of SO{sub 2} compliance activities by the 110 utility plants affected by Phase I is summarized in this report. These compliance plans are presented in a tabular form, correlated with age, capacity, and power pool data. A large number of the Phase I units (46%) have chosen to blend or switch to lower sulfur coals. This choice primarily is in response to (1) prices of low-sulfur coal and (2) the need to maintain SO{sub 2} control flexibility because of uncertain future environmental regulations (e.g., air toxics, carbon dioxide) and compliance prices. The report also discusses the responses of state legislatures and public utility commissions to the compliance requirements in Title IV. Most states have taken negligible action regarding the regulatory treatment of allowances and compliance activities. To protect mine employment, states producing high-sulfur coal have enacted regulations encouraging continued use of that coal, but for the most part, this response has had little effect on utility compliance choices.

  6. NEPA and the Endangered Species Act: Complementary approaches or regulatory excess

    SciTech Connect (OSTI)

    Salk, M.S.; McCold, L.N.

    1991-01-01

    The National Environmental Policy Act (NEPA) of 1969, as amended, provides a broad mandate requiring protection of human health and the natural environmental, while the Endangered Species Act (ESA) of 1973, as amended, has a much narrower mandate. NEPA's purpose is to prevent or eliminate damage to the environment and biosphere{hor ellipsis},'' while the ESA's is to provide a means whereby the ecosystems upon which endangered species and threatened species depend may be conserved'' and a a program for the conservation of such endangered species and threatened species{hor ellipsis}'' NEPA's current role in improving the quality of decision making by federal agencies with respect to environmental matters is a matter of some debate. This paper discusses several ways in which NEPA provides protection for rare species beyond that provided by the ESA including public involvement, consideration of rare plant species, consideration of species which are not federally listed, consideration of incremental actions of federal agencies, and discussion of alternative means to accomplish the goal of a projected action. 3 refs.

  7. Effects of Title IV of the Clean Air Act Amendments of 1990 on Electric Utilities: An Update, The

    Reports and Publications (EIA)

    1997-01-01

    Describes the strategies used to comply with the Acid Rain Program in 1995, the effect of compliance on SO2 emissions levels, the cost of compliance, and the effects of the program on coal supply and demand. It updates and expands the EIA report, Electric Utility Phase I Acid Rain Compliance Strategies for the Clean Air Act Amendments of 1990.

  8. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in North Carolina. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    Under the Public Utilities Act of 1965, utilities in North Carolina are regulated by the State's Utility Commission. The Commission consists of seven members who are appointed by the governor, subject to confirmation by the General Assembly sitting in joint session. The Commissioners serve eight year terms and the governor designates one of the commissioners as chairman. The Commission has an office of the executive director, who is appointed to a six year term by the governor subject to confirmaion by the General Assembly. The executive director heads the Commission's public staff. The public staff's duties include reviewing, investigating, and making recommendations on utility rates and services and intervention on behalf of the public in proceedings affecting consumer rates and generating plant certification. The Commission has the same power to regulate the operation of privately-owned public utilities within municipalities as it has to control those ouside. The only power over privately-owned utilities reserved to the municipalities is the power to grant franchises. A municipality may maintain its own utility systems, and such systems are not subject to the control and jurisdiction of the Commission. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  9. Approaches to Electric Utility Energy Efficiency for Low Income Customers in a Changing Regulatory Environment

    SciTech Connect (OSTI)

    Brockway, N.

    2001-05-21

    As the electric industry goes through a transformation to a more market-driven model, traditional grounds for utility energy efficiency have come under fire, undermining the existing mechanisms to fund and deliver such services. The challenge, then, is to understand why the electric industry should sustain investments in helping low-income Americans use electricity efficiently, how such investments should be made, and how these policies can become part of the new electric industry structure. This report analyzes the opportunities and barriers to leveraging electric utility energy efficiency assistance to low-income customers during the transition of the electric industry to greater competition.

  10. The effects of Title IV of the Clean Air Act amendments of 1990 on electric utilities: An update

    SciTech Connect (OSTI)

    1997-03-01

    This report presents data and analyses related to Phase I implementation of the Clean Air Act Amendment by electric utilities. It describes the strategies used to comply with the Acid Rain Program in 1995, the effect of compliance on sulfur dioxide emissions levels, the cost of compliance, and the effects of the program on coal supply and demand. The first year of Phase I demonstrated that the market-based sulfur dioxide emissions control system could achieve significant reductions in emissions at lower than expected costs. Some utilities reduced aggregate emissions below legal requirements due to economic incentives; other utilities purchased additional allowances to avoid noncompliance. More than half of the utilities switched to or blended with lower sulfur coal, due to price reductions in the coal market which were partially due to the allowance trading program. 21 figs., 20 tabs.

  11. Electric Utility Phase I Acid Rain Compliance Strategies for the Clean Air Act Amendments of 1990

    Reports and Publications (EIA)

    1994-01-01

    The Acid Rain Program is divided into two time periods; Phase I, from 1995 through 1999, and Phase II, starting in 2000. Phase I mostly affects power plants that are the largest sources of SO2 and NOx . Phase II affects virtually all electric power producers, including utilities and nonutilities. This report is a study of the effects of compliance with Phase I regulations on the costs and operations of electric utilities, but does not address any Phase II impacts.

  12. State Agency Recovery Act Funding

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agency Recovery Act Funding .Alabama Alabama Public Service Commission $868,824 .Alaska Regulatory Commission of Alaska $767,493 .Arizona Arizona Corporation Commission $915,679 .Arkansas Arkansas Public Service Commission $822,779 .California California Public Utilities Commission $1,686,869 .Colorado The Public Utilities Commission of the State of Colorado $875,899 .Connecticut Connecticut Department of Public Utility Control $839,241 .Delaware Delaware Public Service Commission $772,254

  13. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Nevada. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate the operatons of public utilities in Nevada is vested generally in the Public Service Commission. The Commission is comprised of three members appointed by the governor to four year terms. One of the members is designated by the governor to act as chairman and serves in that capacity at the pleasure of the governor. Commissioners must be free from employment or pecuniary interests which are incompatible with the duties of the Commission. Within the purview of its powers, the authority of the Commission supercedes that of local governments. Local governments play a role in regulating public utilities only through the exercise of their zoning and franchising powers. In addition, municipally-owned utilities are totally exempt from Commission control. No specific procedure is provided by which the decisions of local governments regarding utilities may be reviewed by the Commission. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  14. Government Performance and Results Act: Performance plan FY 1999, U.S. Nuclear Regulatory Commission. Volume 1

    SciTech Connect (OSTI)

    Fuches, J.L.

    1998-02-01

    The Nuclear Regulatory Commission`s (NRC) strategic plan [NUREG-1614, Vol. 1, September 1997] establishes a strategic framework that will guide future decision-making and will help the NRC continue to meet its responsibility for protecting public health and safety, promoting the common defense and security, and protecting the environment. This performance plan complements the agency`s strategic plan by setting annual goals with measurable target levels of performance for FY 1999, as required by the Government Performance and Results Act. No significant contribution was made to the preparation of the performance plan by any non-Federal entity. However, a contractor was used to help facilitate discussions and resolution of issues. Within six months after the close of FY 1999, the NRC will submit to the President and the Congress a report on program performance for FY 1999. This performance report will review the success of the agency in achieving the performance goals established for FY 1999. Where those goals have been achieved, the underlying assumptions and strategies will be examined to ensure that continued applicability is warranted in the future. If any of the FY 1999 performance goals are not met, the agency will conduct a thorough analysis of why it did not meet the goal and the actions necessary to meet-the goal in the future. One result of this analysis will be the documentation of plans and schedules for achieving the established performance goal. If the analysis should indicate that the performance goal is impractical or infeasible, the performance report will document why that is the case and what action is recommended.

  15. Utilities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 July 2016 ______________________________________________________________________________ 1 Utilities [References: FAR 41, DEAR 941 and 970.4102] 1.0 Summary of Latest Changes This update includes administrative changes. 2.0 Discussion This chapter supplements other more primary acquisition regulations and policies contained in the references above and should be considered in the context of those references. 2.1 Overview. This section discusses the acquisition and sales of utility services by

  16. Commissions as educating organizations: How to educate the public regarding the mission of the public utilities commission in the new regulatory environment

    SciTech Connect (OSTI)

    Sevel, F.

    1996-12-31

    Numerous authors have discussed the massive changes in the new regulatory environment and the necessary impact of these changes on the roles, responsibilities, structure, function, and mission of the public utility commission. In fact, when public utility commissioners gathered in Denver for the NRRI/NARUC Commissioners Summit in April 1995, {open_quotes}they made it clear that they embraced change as necessary to effective commission functioning in new regulatory environments and made it clear that they were prepared to direct that change.{close_quotes} The Commissioners identified the following trends of change: (1) Dichotomy of customers in core and noncore groupings. (2) Unbundling and new service offerings. (3) Deregulation of certain services and markets. (4) Increased use of market-based pricing and incentive ratemaking. (5) Large users seeking lowest-cost service providers. (6) Shift from old regulatory compact [of] territorial exclusivity and assured recovery. (7) Changing obligation to serve. (8) Utility diversification into other businesses and use of holding company structures. (9) Increased business risk for utilities. (10) Uncertainty as to continued attention to social goals. In response to these changes, they identified five clusters of core missions for public utility commissions: (1) Protection of those customers who would not reap the full benefits of competition. (2) Support of competition balanced with an interest in fair and effective competition. (3) The provision of timely and clear decisions to utility managers and allowing utilities the flexibility to adapt to new conditions. (4) Preserving the commitment to social goals compatible with the competitive market. (5) Addressing the impact of new corporate structures, jurisdictional changes, necessary change in regulatory methods, and customer protection in the new environment.

  17. Nuclear Safety Regulatory Framework

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Nuclear Safety Regulatory Framework DOE's Nuclear Safety Enabling Legislation Regulatory Enforcement & Oversight Regulatory Governance Atomic Energy Act 1946 Atomic Energy Act 1954 Energy Reorganization Act 1974 DOE Act 1977 Authority and responsibility to regulate nuclear safety at DOE facilities 10 CFR 830 10 CFR 835 10 CFR 820 Regulatory Implementation Nuclear Safety Radiological Safety Procedural Rules ISMS-QA; Operating Experience; Metrics and Analysis Cross Cutting

  18. H. R. 3532: This act may be cited as the Nuclear Regulatory Commission Authorization Act for Fiscal Year 1999. Introduced in the House of Representatives, One Hundred Fifth Congress, Second Session, March 24, 1998

    SciTech Connect (OSTI)

    Not Available

    1998-03-24

    This bill authorizes appropriations for the Nuclear Regulatory Commission for fiscal year 1999. It is divided into the following sections: Section 1. Short title; Section 102. Allocation of amounts authorized; Section 103. Retention of funds; Section 104. Transfer of certain funds; Section 105. Limitation; Section 106. License fee exemption; Section 107. NRC user fees and actual charges. Section 201. Office location; Section 202. Period of a combined license; Section 203. Gift acceptance authority; Section 204. Carrying of firearms by licensee employees; Section 205. Sabotage of production, utilization or waste storage facilities under construction; Section 206. Unauthorized introduction of dangerous weapons; and Section 207. Continuation of Commissioner service.

  19. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in the United States. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    This report is a summary of a series of preliminary reports describing the laws and regulatory programs of the United states and each of the 50 states affecting the siting and operation of energy generating facilities likely to be used in Integrated Community Energy Systems (ICES). A brief summary of public utility regulatory programs, energy facility siting programs, and municipal franchising authority is presented in this report to identify how such programs and authority may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES. Subsequent reports will (1) describe public utility rate regulatory procedures and practices as they might affect an ICES, (2) analyze each of the aforementioned regulatory programs to identify impediments to the development of ICES, and (3) recommend potential changes in legislation and regulatory practices and procedures to overcome such impediments.

  20. Photovoltaics Program: utility interface southwest regional workshop proceedings

    SciTech Connect (OSTI)

    1981-04-01

    This was the first of a series of regional workshops that will focus on the photovoltaic and utility interface, and the use of photovoltaics as a cogeneration option by utilities. The needs and constraints of the utilities are defined and an understanding is established of the capabilities and limitations of photovoltaic systems as an alternative electricity generation option by utilities. Utilities' viewpoints regarding large-scale central systems and small-scale, interconnected, distributed systems are given. The Public Utility Regulatory Policies Act and other economic, legislative, and regulatory factors affecting photovoltaic systems are discussed. Current status of photovoltaic systems with respect to the Department of Energy Photovoltaic Program is given. (LEW)

  1. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Indiana. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Public Service Commission of Indiana. The Commission is comprised of three members appointed by the governor. Commissioners are appointed for four-year terms. They must be free from any employment or pecuniary interest in any public utility. Indiana courts have stated that the Commission was created and vested with regulatory authority over public utilities in order to relieve these utilities from local regulation. Local governments do, however, have specific statutory authority to determine, by contract or ordinance, the quality and character of service to be provided by public utilities within the municipality. Local governments may also regulate the use of streets and other public property by public utilities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  2. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Kentucky. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    Until April 1, 1979, the Public Service Commission had been vested with exclusive jurisdiction over the regulation of rates and service of utilities. As of that date two new agencies, the Energy Regulatory Commission (ERC) and the Utility Regulatory Commission (URC), have replaced the Public Service Commission. The ERC consists of three full-time members appointed by the governor for four year terms and is responsible for enforcing the provisions of the Kentucky statutes relating to electric and gas utilities. The three-member URC is responsible for enforcing the provisions relating to non-energy utilities such as telephone, sewer, and water utilities. The statutes vest all regulatory authority over public utilities in either the ERC or the URC. Local governments retain only the power to grant local franchises. However, it should be noted, that any utility owned or operated by a political subdivision of the state is exempt from regulation. Thus, local government has complete authority over utilities which are self-owned. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  3. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Louisiana. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Louisiana Public Service Commission, composed of five members elected by the general electorate and elected for six-year terms. The Commission is charged with regulating all public utilities and has such other regulatory authority as provided by law. The Commission, however, has no power to regulate a public utility owned, operated, or regulated on the effective data of this constitution (1921) by the governing authority of one or more political subdivisions unless the Commission is authorized to regulate these utilities by the electorate of the political subdivision involved. An additional statutory provision excludes all municipally-owned public utilities from Commission regulation. New Orleans has retained the regulatory authority which it held as of the effective date of the Louisiana Constitution. Therefore, the Commission exercises no regulatory powers over investor or municipally-owned utilities in New Orleans. A municipality is empowered to own and operate a revenue-producing public utility within or without its boundaries and it may sell and distribute the commodity or service of the public utility within or without its corporate limits and may establish rates, rules, and regulations with respect to the sale and distribution. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  4. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Illinois. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Illinois Commerce Commission, comprised of five members appointed by the governor with the advice and consent of the senate and appointed for five year terms. They must be free from any employment or pecuniary interests in any business subject to regulation by the Commission. Local governments may exercise a large degree of regulatory authority over public utilities providing services within a municipality. The question of whether a municipality will exercise regulatory control over local public utilities must be put to the voters of the city. If the proposition is approved by a majority of the voters, the municipality may regulate services and rates and exercise most of the regulatory functions otherwise assigned to the Commission. If any public utility is dissatisfied with any action of a municipality, the utility is entitled to apply to the Commission for review of the action. On review, the Commission may take any determination which it deems just and reasonable. In addition, municipally-owned utilities are excluded specifically from the definition of public utility. These utilities are not within the jurisdiction of the Commission and are regulated locally. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  5. Career Map: Regulatory Expert | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulatory Expert Career Map: Regulatory Expert A regulatory expert works on a computer with two screens while reading from a book. Regulatory Expert Position Title Regulatory Expert Alternate Title(s) Government Regulatory Expert, Utility Regulatory Expert, Policy & Regulatory Specialist, Policy Analyst, Public Affairs, Legislative Liaison, Government Relations, Government Affairs, Lobbyist Education & Training Level Advanced, Bachelors required, prefer graduate degree Education &

  6. How Regulatory Risk Has Moved Front and Center in the Tug-of-War between State Commissions and Public Utilities

    SciTech Connect (OSTI)

    Keglevic, Paul; McConomy, John; Koppin, John

    2006-11-15

    Deregulation of generation, volatile commodity markets and an increase in proposed utility mergers have heightened the stakes in the historic struggle of public service commissions to balance the interests of ratepayers and shareholders. The authors review this struggle and its impact on recent requests for rate increases and the pending approval of several mergers announced in the past few years. (author)

  7. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Idaho. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The Idaho state legislature has created the Idaho Public Utilities Commission and has given the Commission the power and jurisdiction to supervise and regulate every public utility in the state. The Commission is comprised of three members appointed by the governor with the approval of the senate. Commissioners serve full time and are appointed for six year terms. No more than two of the members may be from the same political party. Title 61 of the Idaho Code, which establishes the Commission and delineates its powers, vests all regulatory responsibility in the Commission to the exclusion of local government. However, as an incident to their franchising power, municipalities may impose reasonable regulations on the use of their streets. The Idaho Supreme Court holds that the transfer of regulatory power over public utilities to the Commission did not diminish the powers and duties of municipalities to control and maintain their streets and alleys. Limited statutory authority also exists giving municipalities the power to regulate the fares, rates, rentals, or charges made for the service rendered under any franchise granted in such city, except such as are subject to regulation by the Public Utilities Commission. With the exception of this limited power, the Commission is the sole agency having regulatory power over Idaho public utilities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  8. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Alabama. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    The Alabama legislature has created the Public Service Commission which has general supervisory powers over utilities. The PSC consists of a president and two associates, who are elected to four-year terms. The PSC has no jurisdiction over municipal utilities and, as a result, local governments retain the power to regulate the operation of their municipally-owned utilities. Municipalities also retain their police power over streets and highways within their territory. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  9. Techniques for analyzing the impacts of certain electric-utility ratemaking and regulatory-policy concepts. Glossary

    SciTech Connect (OSTI)

    1980-08-01

    This document, Glossary, is the first in a series of reports to identify, describe, and apply techniques for analyzing the impacts of certain electric utility concepts. This report was developed with a focus on the currently evolving issues of ratemaking, especially as they might be expected to arise under Sections 101, 111, 113, 114, 131, 132, and 210 of the P.U.R.P.A. of 1978. Because the evolutionary process of ratemaking has led to multiple proceedings and changes of inference in some terms, the glossary attempts to delineate these changes where appropriate. Definitions not uniquely related to ratemaking are included if they are likely to be used in ratemaking proceedings. To avoid unnecessary duplication of effort and expense, the compilers relied heavily on previously developed, publicly available glossaries and definitions developed by organizations such as Edison Electric Institute, the Electric Power Research Institute, and the Institute of Electrical and Electronics Engineers. Existing definitions were revised and new ones were developed as appropriate.

  10. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in California. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    The Constitution of the State of California grants to the Legislature control over persons and private corporations that own or operate a line, plant, or system for the production, generation, or transmission of heat, light, water, or power to be furnished either directly or indirectly to or for the public. The Constitution establishes the Public Utilities Commission and grants certain specific powers to the PUC, including the power to fix rates, establish rules and prescribe a uniform system of accounts. The Constitution also recognizes that the Legislature has plenary power to confer additional authority and jurisdiction upon the PUC. The Constitution prohibits regulation by a city, county, or other municipal body of matters over which the Legislature has granted regulatory power to the PUC. This provision does not, however, impair the right of any city to grant franchises for public utilities. The California legislature has enacted the California Public Utilities Code and has designated the PUC as the agency to implement the regulatory provisions of the Code. The Public Utilities Commission consists of five members appointed by the governor and approved by the senate, a majority of the membership concurring, for staggered 6-year terms. Certain limited powers over the conduct of public utilities may still be exercised by municipalities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  11. Proceedings of Office of Surface Mining Coal Combustion By-product Government/Regulatory Panel: University of Kentucky international ash utilization symposium

    SciTech Connect (OSTI)

    Vories, K.C.

    2003-07-01

    Short papers are given on: the Coal Combustion Program (C2P2) (J. Glenn); regional environmental concerns with disposal of coal combustion wastes at mines (T. FitzGerald); power plant waste mine filling - an environmental perspective (L.G. Evans); utility industry perspective regarding coal combustion product management and regulation (J. Roewer); coal combustion products opportunities for beneficial use (D.C. Goss); state perspective on mine placement of coal combustion by-products (G.E. Conrad); Texas regulations provide for beneficial use of coal combustion ash (S.S. Ferguson); and the Surface Mining Control and Reclamation Act - a response to concerns about placement of CCBs at coal mine sites (K.C. Vories). The questions and answers are also included.

  12. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in New York. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the New York Public Service Commission. The Commission is composed of five members appointed by the governor with the advice and consent of the senate. Commissioners are appointed for six-year terms. Commissioners may not have any pecuniary or financial interest in any public utility. Local governing bodies are authorized to exercise such power, jurisdiction and authority in enforcing the laws of the state and the orders, rules, and regulations of the commission as may be prescribed by statute or by the commission with respect to public utilities. A Commission spokesman confirmed that no statutes have been passed pursuant to this provision and the Commission has not ceded any of its regulatory powers to local governments. With the exception of the granting of franchises and permits to use public ways, local governments exercise no regulatory powers over public utilities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  13. DOE Report to Congress„Energy Efficient Electric and Natural Gas Utilities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    REGIONAL POLICIES THAT PROMOTE ENERGY EFFICIENCY PROGRAMS CARRIED OUT BY ELECTRIC AND GAS UTILITIES A REPORT TO THE UNITED STATES CONGRESS PURSUANT TO SECTION 139 OF THE ENERGY POLICY ACT OF 2005 MARCH 2007 U.S. DEPARTMENT OF ENERGY Sec. 139. Energy Efficient Electric and Natural Gas Utilities Study. a) IN GENERAL.-Not later than 1 year after the date of enactment of this Act, the Secretary, in consultation with the National Association of Regulatory Utility Commis- sioners and the National

  14. Electric Consumers Protection Act of 1986

    SciTech Connect (OSTI)

    Echeverria, J.D.

    1987-01-01

    An overview of the Electric Consumers Protection Act of 1986 identifies it as the most important federal legislation dealing with hydroelectric development standards since the Federal Water Power Act of 1920. The author summarizes its major components, and identifies some of the existing and potential issues relation to its implementation. The most controversial issue is the selection of a new licensee for a project once the original licensee's term has expired. Other issues concern environmental criteria, comprehensive planning, amendments to the Public Utility Regulatory Policies Act, and enforcement procedures. The article concludes with a summary of miscellaneous provisions, including antitrust, modifications and time calculations of projects, wheeling, and other concerns.

  15. EPAct Transportation Regulatory Activities

    SciTech Connect (OSTI)

    2011-11-21

    The U.S. Department of Energy's (DOE) Vehicle Technologies Program manages several transportation regulatory activities established by the Energy Policy Act of 1992 (EPAct), as amended by the Energy Conservation Reauthorization Act of 1998, EPAct 2005, and the Energy Independence and Security Act of 2007 (EISA).

  16. Analysis of the Clean Air Act Amendments of 1990: A forecast of the electric utility industry response to Title IV, Acid Deposition Control

    SciTech Connect (OSTI)

    Molburg, J.C.; Fox, J.A.; Pandola, G.; Cilek, C.M.

    1991-10-01

    The Clean Air Act Amendments of 1990 incorporate, for the first time, provisions aimed specifically at the control of acid rain. These provisions restrict emissions of sulfur dioxide (SO[sub 2]) and oxides of nitrogen (NO[sub x]) from electric power generating stations. The restrictions on SO[sub 2] take the form of an overall cap on the aggregate emissions from major generating plants, allowing substantial flexibility in the industry's response to those restrictions. This report discusses one response scenario through the year 2030 that was examined through a simulation of the utility industry based on assumptions consistent with characterizations used in the National Energy Strategy reference case. It also makes projections of emissions that would result from the use of existing and new capacity and of the associated additional costs of meeting demand subject to the emission limitations imposed by the Clean Air Act. Fuel-use effects, including coal-market shifts, consistent with the response scenario are also described. These results, while dependent on specific assumptions for this scenario, provide insight into the general character of the likely utility industry response to Title IV.

  17. Analysis of the Clean Air Act Amendments of 1990: A forecast of the electric utility industry response to Title IV, Acid Deposition Control

    SciTech Connect (OSTI)

    Molburg, J.C.; Fox, J.A.; Pandola, G.; Cilek, C.M.

    1991-10-01

    The Clean Air Act Amendments of 1990 incorporate, for the first time, provisions aimed specifically at the control of acid rain. These provisions restrict emissions of sulfur dioxide (SO{sub 2}) and oxides of nitrogen (NO{sub x}) from electric power generating stations. The restrictions on SO{sub 2} take the form of an overall cap on the aggregate emissions from major generating plants, allowing substantial flexibility in the industry`s response to those restrictions. This report discusses one response scenario through the year 2030 that was examined through a simulation of the utility industry based on assumptions consistent with characterizations used in the National Energy Strategy reference case. It also makes projections of emissions that would result from the use of existing and new capacity and of the associated additional costs of meeting demand subject to the emission limitations imposed by the Clean Air Act. Fuel-use effects, including coal-market shifts, consistent with the response scenario are also described. These results, while dependent on specific assumptions for this scenario, provide insight into the general character of the likely utility industry response to Title IV.

  18. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Tennessee. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The Tennessee Public Service Commission has been designated by the legislature as the agency primarily responsible for the regulation of public utilities and carriers. The Commission is comprised of three members elected by the voters of the state. Each member of the Commission serves a six-year term. The Commission is given broad supervisory control over public utilities in the public utilities statute. Included under its authority is the power to determine whether a privilege or franchise granted to a public utility by a municipality is necessary and proper for the public convenience. No privilege or franchise is valid until it has been approved by the Commission. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  19. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Missouri. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities in Missouri is vested in the Public Service Commission. The Commission is composed of five members who are appointed by the governor with the advice and consent of the senate. Commissioners are appointed for a term of six years. Commissioners must be free from any employment or pecuniary interests incompatible with the duties of the Commission. The Commission is charged with the general supervision of public utilities. The Public Service Commission Law passed in 1913, makes no provision for the regulation of public utilities by municipalities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  20. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Virginia. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilties is vested generally in the State Corporation Commission. The Commission is comprised of three members elected by a joint vote of the two houses of the general assembly. Commissioners serve six-year terms. They must be free from any employment or pecuniary interests in any company subject to the supervision and regulation of the Commission. The Commission is charged with the primary responsibility of supervising and regulating public utilities. However, local governments retain the power to grant franchises and otherwise regulate the use of streets and other public property. In addition, municipally-owned utilities are not within the jurisdiction of the Commission to the extent that they operate within corporate limits. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  1. Regulatory Policy Guide/Game Concept Paper

    SciTech Connect (OSTI)

    Driving Ratepayer-Funded Efficiency through Regulatory Policies Working Group

    2011-09-01

    Proposes a new resource for utility regulators to plot a course through regulatory options available to surmount barriers to aggressive and sustained utility investment in energy efficiency programs.

  2. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Mississippi. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities in Mississippi is vested generally in the Public Service Commission, composed of three members elected for four year terms from separate districts of the state. Within the purview of its powers, the authority of the Commission supersedes that of local governments. It is empowered to amend municipal franchises that contain provisions conflicting with its exclusive jurisdiction over the rates and standards of service of public utilities. Local governments play a role in regulating public utilities only through the exercise of their zoning and franchising powers. They may also operate their own utilities which are totally exempt from Commission control, unless they provide services more than one mile beyond their corporate boundaries. Other than a procedure in which certain provisions in municipal franchises may be subject to modification by the Commission, there is no process by which the decisions of local government respecting utilities are reviewed by the Commission. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  3. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in New Jersey. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate the operations of public utilities in New Jersey is generally vested in the Board of Public Utilities. The Board is subsumed within the Department of Energy for administrative purposes, but functions largely independently of supervision or control by that agency. The Board is composed of three members who serve for six-year terms. They are appointed by the governor with the advice and consent of the senate. Within the purview of its powers, the authority of the Board supersedes that of local governments. The Board, for example, may grant exemptions from local zoning provisions, and has approving authority over privileges or franchises granted by municipalities to public utilities. The Board, however, cannot override the refusal of a municipality to grant consent to the initiation of operations by a public utility. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  4. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in South Dakota. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The South Dakota Public Utilities Commission is authorized by statute to regulate gas and electric utilities. The Commission consists of three elected commissioners each of whom serves for a six year term. The Commissioners are elected by district and each must, at the time of election, be a resident of the district from which he has been elected. Each Commissioner must reside in the state capital and devote his entire time to the duties of his office. The Commission is part of the Department of Commerce and Consumer Protection. Municipal power to regulate privately owned electric and gas public utilities was terminated in 1975. A municipally-owned electric utility has the authority to regulate the sale, use, and rates of electric power and energy which it provides. The Commission has no authority to regulate steam, heat, and refrigeration systems; that power resides in cities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  5. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Massachusetts. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Department of Public Utilities. The Department is under the supervision and control of a commission consisting of three members appointed by the governor for terms of four years. No more than two of the commissioners may be members of the same political party. Commissioners must be freee from any employment or financial interests which are incompatible with the duties of the Department. The Department is responsible for regulating public utilities. The Department is specifically granted general supervisory authority over all gas and electric companies. Specific provisions for the appeal of local decisions exist only in the case of a municipality's approval or disapproval of new operaions by an electric or gas company in a municipality already being served by another such utility. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  6. Analysis of the Clean Energy Standard Act of 2012

    Gasoline and Diesel Fuel Update (EIA)

    5 Appendix D: Request Letter and Bill May 2012 U.S. Energy Information Administration | Analysis of the Clean Energy Standard Act of 2012 16 May 2012 U.S. Energy Information Administration | Analysis of the Clean Energy Standard Act of 2012 17 II 112TH CONGRESS 2D SESSION S. 2146 To amend the Public Utility Regulatory Policies Act of 1978 to create a market-oriented standard for clean electric energy generation, and for other purposes. IN THE SENATE OF THE UNITED STATES MARCH 1, 2012 Mr.

  7. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Washington. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The Washinton State Constitution grants authority to the legislature to regulate railroads and other common carriers as well as telegraph and telephone companies in the state. No section of the constitution expressly provides for the regulation of electric, gas, water, or heating utilities. The authority to regulate public utilities is vested generally in the Utilities and Transportation Commission, formerly designated at the Public Service Commission. The Commission is composed of three members appointed by the governor, with the consent of the senate. The term of office for commissioners is six years. Recently enacted legislation provides for the implementation of tax incentives to encourage the development of cogeneration facilities in the state. This plan is to be administered by the Department of Revenue in conjunction with the Energy Office. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  8. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ENVIRONMENTAL ASSESSMENT (January 15, 2013) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects reviewed the Public Utility District No. 1 of Snohomish County, Washington's (Snohomish PUD) application for a 10-year pilot license for the proposed Admiralty Inlet Tidal Project No. 12690, which would be located in Admiralty Inlet

  9. Regulatory Streamlining and Improvement

    SciTech Connect (OSTI)

    Mark A. Carl

    2006-07-11

    The Interstate Oil and Gas Compact Commission (IOGCC) engaged in numerous projects outlined under the scope of work discussed in the United States Department of Energy (DOE) grant number DE-FC26-04NT15456 awarded to the IOGCC. Numerous projects were completed that were extremely valuable to state oil and gas agencies as a result of work performed utilizing resources provided by the grant. There are numerous areas in which state agencies still need assistance. This additional assistance will need to be addressed under future scopes of work submitted annually to DOE's Project Officer for this grant. This report discusses the progress of the projects outlined under the grant scope of work for the 2005-2006 areas of interest, which are as follows: Area of Interest No. 1--Regulatory Streamlining and Improvement: This area of interest continues to support IOGCC's regulatory streamlining efforts that include the identification and elimination of unnecessary duplications of efforts between and among state and federal programs dealing with exploration and production on public lands. Area of Interest No. 2--Technology: This area of interest seeks to improve efficiency in states through the identification of technologies that can reduce costs. Area of Interest No. 3--Training and Education: This area of interest is vital to upgrading the skills of regulators and industry alike. Within the National Energy Policy, there are many appropriate training and education opportunities. Education was strongly endorsed by the President's National Energy Policy Development group. Acting through the governors offices, states are very effective conduits for the dissemination of energy education information. While the IOGCC favors the development of a comprehensive, long-term energy education plan, states are also supportive of immediate action on important concerns, such as energy prices, availability and conservation. Area of Interest No. 4--Resource Assessment and Development: This area

  10. Regulatory and Permitting Information Desktop (RAPID) Toolkit (Poster)

    SciTech Connect (OSTI)

    Young, K. R.; Levine, A.

    2014-09-01

    The Regulatory and Permitting Information Desktop (RAPID) Toolkit combines the former Geothermal Regulatory Roadmap, National Environmental Policy Act (NEPA) Database, and other resources into a Web-based tool that gives the regulatory and utility-scale geothermal developer communities rapid and easy access to permitting information. RAPID currently comprises five tools - Permitting Atlas, Regulatory Roadmap, Resource Library, NEPA Database, and Best Practices. A beta release of an additional tool, the Permitting Wizard, is scheduled for late 2014. Because of the huge amount of information involved, RAPID was developed in a wiki platform to allow industry and regulatory agencies to maintain the content in the future so that it continues to provide relevant and accurate information to users. In 2014, the content was expanded to include regulatory requirements for utility-scale solar and bulk transmission development projects. Going forward, development of the RAPID Toolkit will focus on expanding the capabilities of current tools, developing additional tools, including additional technologies, and continuing to increase stakeholder involvement.

  11. History of Regulatory Oversight at LANL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    History of Regulatory Oversight History of Regulatory Oversight at LANL History of Regulatory Oversight at LANL 1943-1950: Manhattan Project Era Few environmental regulations Best available protection technologies employed, though rudimentary 1950s-1970s: Cold War Era Laboratory moved from townsite to current location Advent of national environmental protection laws Clean Air Act Clean Water Act Resource Conservation and Recovery Act (RCRA) 1980s-1990s: Non-proliferation/Stockpile Reduction LANL

  12. Tribal Utility Policy Issues

    Broader source: Energy.gov (indexed) [DOE]

    ... Coal Combustion Residuals Regulation Act of 2015 (H.R. 1734) FCC's Connect America Funding to provide broadband to rural communities Gas Utility Issues Pipeline Safety & ...

  13. Regulatory Processes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance & Equipment Standards » Rulemakings & Notices » Regulatory Processes Regulatory Processes Beginning with the Energy Policy and Conservation Act of 1975, Congress has enacted a series of laws establishing federal appliance and equipment standards and the Department of Energy's (DOE) authority to develop, amend, and implement standards. To implement these laws, the Appliance and Equipment Standards program manages the regulatory processes described below. Standards Development

  14. Coal Distribution and Utilization Act of 1987. Hearing before the Committee on Energy and Natural Resources, United States Senate, One Hundredth Congress, First Session on S. 801, September 10, 1987

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    The hearing was called to review Senate bill S.801 which would provide Federal eminent domain authority for coal slurry pipelines to facilitate the national distribution and utilization of coal. Obtaining rights-of-way for the pipelines, particularly across railroad lands, has been a major stumbling lock to construction in the US. Testimony was heard from 9 witnesses, representing the Building and Construction Trade Department of AFL-CIO, Snamprogetti USA, Association of American Railroads, Railway Labor Executives Association, Coal and Slurry Technology Association, American Mining Congress, Edison Electric Institute, and the state of Louisiana. An attorney at law also gave testimony. Additional material was submitted by the National Association of Regulatory Utility Commissioners, the American Farm Bureau Federation, American Public Power Association, several union representatives, and the National Rural Electric Cooperative Association.

  15. Recovery Act: State Assistance for Recovery Act Related Electricity

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policies | Department of Energy Act: State Assistance for Recovery Act Related Electricity Policies Recovery Act: State Assistance for Recovery Act Related Electricity Policies $44 Million for State Public Utility Commissions State public utility commissions (PUCs), which regulate and oversee electricity projects in their states, will be receiving more than $44.2 million in Recovery Act funding to hire new staff and retrain existing employees to ensure they have the capacity to quickly and

  16. Wholesale service obligation of electric utilities

    SciTech Connect (OSTI)

    Norton, F.L. IV; Spivak, M.R.

    1985-01-01

    The basic concepts of public utility status and utility regulation intertwine the obligation to provide service to the public as reasonably demanded with rate regulation and shielding from competitive interference. While a common law service obligation was not part of the Federal Power Act, the Federal Energy Regulatory Commission has taken the position that service, once commenced, may not be terminated without its approval. This view of Commission authority may not be supported by the legislative history of the Federal Power Act or by judicial precedent. The requirement to serve apart from recognition of a right to serve may result in increased rates in the near term and insufficient capacity, or both, in the long run. A review by the Commission and the courts is examining ways to introduce competition and shift risks from ratepayers to shareholders.

  17. Montana Environmental Policy Act Guide | Open Energy Information

    Open Energy Info (EERE)

    Environmental Policy Act Guide Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Montana Environmental Policy Act...

  18. Assessment of potential and existing problems concerning interface between electric utilities and cogenerators

    SciTech Connect (OSTI)

    Not Available

    1980-03-01

    The potential and existing problems concerning the interface between US electric utilities and cogenerators are considered by region. Also considered are regulatory barriers, rates and contracts, economic feasibility, and impact on system planning. Finally, the impact of the National Energy Act on the marketability potential of cogeneration is reviewed. The three appendixes summarize the utility meetings on cogeneration held in Washington, DC, Los Angeles, and Chicago.

  19. Utilities Offering Federal Utility Energy Service Contracts | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Utilities Offering Federal Utility Energy Service Contracts Utilities Offering Federal Utility Energy Service Contracts The Energy Policy Act of 1992 (codified as 42 USC Section 8256 (c) Utility Incentive Programs) authorizes and encourages agencies to participate in generally available utility programs to increase energy efficiency; conserve water; or manage electricity demand conducted by gas, water, or electric utilities. The following maps show utility service territories

  20. Regulatory Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regulatory Tools Home CRA - 2004 Final Recertification Decision CRA Comments & Responses CCA - 1996 CRA CARDs & TSDs CCA CARDs & TSDs Regulatory Tools Title 40 CFR Part 191 Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes. Title 40 CFR Part 194 Criteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations.

  1. Comments by the National Association of State Utility Consumer...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    state laws to represent utility consumers before federal and state utility regulatory commissions, before other federal and state agencies, and before federal and state courts. ...

  2. WYDOT - Utility Accommodation Regulation Manual | Open Energy...

    Open Energy Info (EERE)

    Regulation ManualPermittingRegulatory GuidanceGuideHandbook Abstract This manual sets forth the processes and procedures for utility accommodation on WYDOT rights-of-way. Author...

  3. Regulatory Processes

    Broader source: Energy.gov [DOE]

    Beginning with the Energy Policy and Conservation Act of 1975, Congress has enacted a series of laws establishing federal appliance and equipment standards and the Department of Energy's (DOE)...

  4. Tribal Renewable Energy Webinar: Project Regulatory Considerations |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Project Regulatory Considerations Tribal Renewable Energy Webinar: Project Regulatory Considerations August 31, 2016 11:00AM to 12:30PM MDT Learn about the many permitting and project regulatory issues that need to be addressed when developing energy projects. Considerations include the Helping Expedite and Advance Responsible Tribal Home Ownership (HEARTH) Act, land use, noise, birds, and other biological resources; visual impact; soil erosion and water quality; public

  5. Understanding the Energy Policy and Regulatory Environment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Understanding the Energy Policy and Regulatory Environment Douglas MacCourt Senior Policy Advisor Department of Energy, Office of Indian Energy Policy and Programs 2 Presentation Agenda * Regulatory and Policy Considerations o Legal Issues, Interconnection, permitting considerations, Clean Power Plan * Federal, State, & Utility Incentives o Net metering, Renewable Portfolio Standards, ITC * Tools 3 REGULATORY AND POLICY CONSIDERATIONS 4 Legal Issues Legal issues to consider in exploring your

  6. Utility Partnerships

    Broader source: Energy.gov [DOE]

    Utility Partnerships 7/10/12. Provides an overview of LEAP's (Charlottesville, VA) partnership with local utilities.

  7. H. R. 1007: A bill to amend the Internal Revenue Code of 1986 to exclude from gross income payments made by electric utilities to customers to subsidize the cost of energy conservation services and measures, introduced in the House of Representatives, One Hundred Second Congress, First Session, February 20, 1991

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    The term energy conservation measure, for the purpose of this bill, refers to any residential or commercial energy conservation measure described in the National Energy Conservation Policy Act or any specially defined energy property in effect on the day before the date of enactment of the Revenue Reconciliation Act of 1990. This bill shall not apply to any payment to or from a qualified cogeneration facility or qualifying small power production facility defined in the Public Utilities Regulatory Policy Acts of 1978.

  8. The Vermont Shoreland Protection Act: A Handbook for Shoreland...

    Open Energy Info (EERE)

    The Vermont Shoreland Protection Act: A Handbook for Shoreland Development Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  9. Power Sales to Electric Utilities

    SciTech Connect (OSTI)

    1989-02-01

    The Public Utilities Regulatory Policies Act (PURPA) of 1979 requires that electrical utilities interconnect with qualifying facilities and purchase electricity at a rate based upon their full avoided costs (i.e., costs of providing both capacity and energy). Qualifying facilities (QF) include solar or geothermal electric units, hydropower, municipal solid waste or biomass-fired power plants, and cogeneration projects that satisfy maximum size, fuel use, ownership, location, and/or efficiency criteria. In Washington State, neither standard power purchase prices based upon a proxy ''avoided plant'', standard contracts, or a standard offer process have been used. Instead, a variety of power purchase contracts have been negotiated by developers of qualifying facilities with investor-owned utilities, public utility districts, and municipally-owned and operated utilities. With a hydro-based system, benefits associated with resource acquisition are determined in large part by how compatible the resource is with a utility's existing generation mix. Power purchase rates are negotiated and vary according to firm energy production, guarantees, ability to schedule maintenance or downtime, rights of refusal, power plant purchase options, project start date and length of contract; front-loading or levelization provisions; and the ability of the project to provide ''demonstrated'' capacity. Legislation was also enacted which allows PURPA to work effectively. Initial laws established ownership rights and provided irrigation districts, PUDs, and municipalities with expanded enabling powers. Financial processes were streamlined and, in some cases, simplified. Finally, laws were passed which are designed to ensure that development proceeds in an environmentally acceptable manner. In retrospect, PURPA has worked well within Washington. In the state of Washington, 20 small-scale hydroelectric projects with a combined generating capacity of 77 MW, 3 solid waste-to-energy facilities

  10. Recovery Act: State Assistance for Recovery Act Related Electricity Policies

    Broader source: Energy.gov [DOE]

    State public utility commissions (PUCs), which regulate and oversee electricity projects in their states, will be receiving more than $44.2 million in Recovery Act funding to hire new staff and retrain existing employees to ensure they have the capacity to quickly and effectively review proposed electricity projects. The funds will help the individual state PUCs accelerate reviews of the large number of electric utility requests that are expected under the Recovery Act.

  11. Title 40 CFR 230 Definitions - Clean Water Act | Open Energy...

    Open Energy Info (EERE)

    RegulationRegulation: Title 40 CFR 230 Definitions - Clean Water ActLegal Abstract Sets forth regulatory definitions under the Clean Water Act including the definition of waters of...

  12. Nuclear regulatory legislation, 104th Congress, Volume 1, No. 4

    SciTech Connect (OSTI)

    1997-12-01

    This document is the first of two volumes compiling statutes and material pertaining to nuclear regulatory legislation through the 104th Congress, 2nd Session. It is intended for use as a U.S. Nuclear Regulatory Commission (NRC) internal resource document. Legislative information reproduced in this document includes portions of the Atomic Energy Act, Energy Reorganization Act, Low-Level Radioactive Waste Policy Amendments Act, and Nuclear Waste Policy Act. Other information included in this volume pertains to NRC user fees, NRC authorizations, the Inspector General Act, and the Administrative Procedure Act.

  13. Emissions trading and compliance: Regulatory incentives and barriers

    SciTech Connect (OSTI)

    South, D.W.; Bailey, K.A. ); McDermott, K.A. . Center for Regulatory Studies)

    1992-01-01

    The Title IV of the Clean Air Act Amendments of 1990 (P.L. 101-549) authorizes the use of transferable emission allowances to achieve reductions in the power generating industry's SO{sub 2} emissions at a minimum possible cost. All electricity generators (greater than 25 MW) are required to hold emissions allowances equal to the amount (tons) of SO{sub 2} emitted during a given year, and meet NO{sub x} reduction levels indicated by the Revised New Source Performance Standards (NSPS). This paper will examine the multifaceted goals and problems of states and utilities relative to compliance with Title IV, and in particular as they pertain to the development and functioning of the allowance market together with utility pollution control and power generation technology choice. Section 2 presents possible utility compliance strategies along with possible barriers that utilities may confront regarding the development of a SO{sub 2} allowance market. Section 3 discusses current regulatory barriers and requirements being implemented by state public utility commissions, and Section 4 offers some policy recommendations to achieve the goals of Title IV. Finally, Section 5 presents a summary and conclusions; Appendix A provides programs/mandates developed to data by high sulfur coal states in response to Title IV compliance requirements.

  14. Emissions trading and compliance: Regulatory incentives and barriers

    SciTech Connect (OSTI)

    South, D.W.; Bailey, K.A.; McDermott, K.A.

    1992-04-01

    The Title IV of the Clean Air Act Amendments of 1990 (P.L. 101-549) authorizes the use of transferable emission allowances to achieve reductions in the power generating industry`s SO{sub 2} emissions at a minimum possible cost. All electricity generators (greater than 25 MW) are required to hold emissions allowances equal to the amount (tons) of SO{sub 2} emitted during a given year, and meet NO{sub x} reduction levels indicated by the Revised New Source Performance Standards (NSPS). This paper will examine the multifaceted goals and problems of states and utilities relative to compliance with Title IV, and in particular as they pertain to the development and functioning of the allowance market together with utility pollution control and power generation technology choice. Section 2 presents possible utility compliance strategies along with possible barriers that utilities may confront regarding the development of a SO{sub 2} allowance market. Section 3 discusses current regulatory barriers and requirements being implemented by state public utility commissions, and Section 4 offers some policy recommendations to achieve the goals of Title IV. Finally, Section 5 presents a summary and conclusions; Appendix A provides programs/mandates developed to data by high sulfur coal states in response to Title IV compliance requirements.

  15. The net utility revenue impact of small power producing facilities operating under spot pricing policies

    SciTech Connect (OSTI)

    MacGregor, P.R.

    1989-01-01

    The National Energy Act, in general, and Section 210 of the Public Utilities Regulatory Policies Act (PURPA) of 1978 in particular, have dramatically stimulated increasing levels of independent non-utility power generation. As these levels of independent non-utility power generation increase, the electric utility is subjected to new and significant operational and financial impacts. One important concern is the net revenue impact on the utility which is the focus of the research discussed in this thesis and which is inextricably intertwined with the operational functions of the utility system. In general, non-utility generation, and specifically, cogeneration, impact utility revenues by affecting the structure and magnitude of the system load, the scheduling of utility generation, and the reliability of the composite system. These effects are examined by developing a comprehensive model non-utility independent power producing facilities, referenced as Small Power Producing Facilities, a cash-flow-based corporate model of the electric utility, a thermal plant based generation scheduling algorithm, and a system reliability evaluation. All of these components are integrated into an iterative closed loop solution algorithm to both assess and enhance the net revenue. In this solution algorithm, the spot pricing policy of the utility is the principal control mechanism in the process and the system reliability is the primary procedural constraint. A key issue in reducing the negative financial impact of non-utility generation is the possibility of shutting down utility generation units given sufficient magnitudes of non-utility generation in the system. A case study simulating the financial and system operations of the Georgia Power Company with representative cogeneration capacity and individual plant characteristics is analyzed in order to demonstrate the solution process.

  16. EIS-0038: Fuel Use Act

    Broader source: Energy.gov [DOE]

    The Economic Regulatory Administration developed this EIS to evaluate the programmatic environmental impacts that would result from implementation of the regulations for enacting the coal and alternate fuels use program which has been authorized by the Power Plant and Industrial Fuel Use Act of 1978 (FUA) Pub. L . 95-620.

  17. FRP Policy 16: Utility Easements | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: FRP Policy 16: Utility EasementsPermittingRegulatory GuidanceGuideHandbook...

  18. Georgia Shore Assistance Act

    SciTech Connect (OSTI)

    Pendergrast, C.

    1984-01-01

    The Georgia General Assembly passed the Shore Assistance Act in 1979 in order to fill a regulatory gap in the state's management of its coastal resources. A review of its legislative history, purposes, applications, and effects in terms of the sand sharing system of sand dunes, beaches, sandbars, and shoals concludes that the Act is poorly drafted. In its application on the oceanfront, it betrays its intent and protects the oceanfront owner. It has failed to satisfy the requirements of the public trust in the tidal foreshore. Amendments to clarify its understanding of the functions and values of the sand-sharing system should also conform with the state's duties under the public trust. 139 references.

  19. Recovery Act

    Broader source: Energy.gov [DOE]

    Recovery Act and Energy Department programs were designed to stimulate the economy while creating new power sources, conserving resources and aligning the nation to once again lead the global energy economy.

  20. Approaches to Electric Utility Energy Efficiency for Low Income...

    Open Energy Info (EERE)

    Approaches to Electric Utility Energy Efficiency for Low Income Customers in a Changing Regulatory Environment Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Approaches...

  1. Labview utilities

    Energy Science and Technology Software Center (OSTI)

    2011-09-30

    The software package provides several utilities written in LabView. These utilities don't form independent programs, but rather can be used as a library or controls in other labview programs. The utilities include several new controls (xcontrols), VIs for input and output routines, as well as other 'helper'-functions not provided in the standard LabView environment.

  2. Utility Formation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Outreach Doing Business Expand Doing Business Skip navigation links Newsroom About Us Civil Rights - EEO Freedom of Information Act Investor Relations Library Privacy...

  3. Solar: A Clean Energy Source for Utilities

    SciTech Connect (OSTI)

    Solar Energy Technologies Program

    2010-09-28

    The fact sheet summarizes the goals and activities of the DOE Solar Energy Technologies Program efforts with utilities to remove the technical, regulatory, and market challenges they face in deploying solar technologies.

  4. Financial impacts of nonutility power purchases on investor-owned electric utilities

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    To assist in its these responsibilities in the area of electric power, EIA has prepared this report, Financial Impacts of Nonutility Power Purchases on Investor-Owned Electric Utilities. The primary purpose of this report is to provide an overview of the issues surrounding the financial impacts of nonutility generation contracts (since the passage of the Public Utility Regulatory Policies Act of 1978) on investor-owned utilities. The existing concern in this area is manifest in the provisions of Section 712 of the Energy Policy Act of 1992, which required State regulatory commissions to evaluate various aspects of long-term power purchase contracts, including their impact on investor-owned utilities` cost of capital and rates charged to customers. The EIA does not take positions on policy questions. The EIA`s responsibility is to provide timely, high quality information and to perform objective, credible analyses in support of the deliberations by both public and private decision-makers. Accordingly, this report does not purport to represent the policy positions of the US Department of Energy or the Administration.

  5. Utility FGD Survey, January--December 1989

    SciTech Connect (OSTI)

    Hance, S.L.; McKibben, R.S.; Jones, F.M. )

    1992-03-01

    The Utility flue gas desulfurization (FGD) Survey report, which is generated by a computerized data base management system, represents a survey of operational and planned domestic utility flue gas desulfurization (FGD) systems. It summarizes information contributed by the utility industry, system and equipment suppliers, system designers, research organizations, and regulatory agencies. The data cover system design, fuel characteristics, operating history, and actual system performance. Also included is a unit-by-unit discussion of problems and solutions associated with the boilers, scrubbers, and FGD systems. The development status (operational, under construction, or in the planning stages), system supplier, process, waste disposal practice, and regulatory class are tabulated alphabetically by utility company.

  6. Nuclear regulatory legislation, 104th Congress. Volume 2, No. 4

    SciTech Connect (OSTI)

    1997-12-01

    This document is the second of two volumes compiling statutes and material pertaining to nuclear regulatory legislation through the 104th Congress, 2nd Session. It is intended for use as a U.S. Nuclear Regulatory Commission (NRC) internal resource document. Legislative information reproduced in this document includes portions of the Paperwork Reduction Act, various acts pertaining to low-level radioactive waste, the Clean Air Act, the Federal Water Pollution Control Act, the National Environmental Policy Act, the Hazardous Materials Transportation Act, the West Valley Demonstration Project Act, Nuclear Non-Proliferation and Export Licensing Statutes, and selected treaties, agreements, and executive orders. Other information provided pertains to Commissioner tenure, NRC appropriations, the Chief Financial Officers Act, information technology management reform, and Federal civil penalties.

  7. Recovery Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Recovery Act - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced Nuclear Energy

  8. Obtain regulatory support services and technical expertise

    Broader source: Energy.gov [DOE]

    The purpose of this task order (TO) is to obtain regulatory support services and technical expertise required to comply with the March 2005 Compliance Order on Consent (Consent Order), the Individual Permit for Stormwater (IP), Resource Conservation and Recovery Act (RCRA) Hazardous Waste Facility Permit (RCRA Permit, and other applicable compliance areas for Fiscal Year 2016.

  9. Coming utility squeeze play

    SciTech Connect (OSTI)

    Stoiaken, L.N.

    1988-02-01

    Like a sleeping giant, utilities are waking up and preparing to participate in the increasingly competitive power production industry. Some are establishing subsidiaries to participate in join venture deals with independents. Others are competing by offering lucrative discount or deferral rates to important industrial and commercial customers considering cogeneration. And now, a third approach is beginning to shape up- the disaggregation of generation assets into a separate generation company, or genco. This article briefly discusses these three and also devotes brief sections to functional segmentation and The regulatory arena.

  10. Other Regulatory Efforts

    Broader source: Energy.gov [DOE]

    In addition to regulating international electricity trade, the Office of Electricity Delivery and Energy Reliability participates in other regulatory activities.

  11. Reducing Regulatory Burden

    Office of Energy Efficiency and Renewable Energy (EERE)

    As part of its implementation of Executive Order 13563, ‘‘Improving Regulation and Regulatory Review,’’

  12. President Ford Signs the Energy Reorganization Act of 1974 | National

    National Nuclear Security Administration (NNSA)

    Nuclear Security Administration | (NNSA) Ford Signs the Energy Reorganization Act of 1974 President Ford Signs the Energy Reorganization Act of 1974 Washington, DC President Ford signs the Energy Reorganization Act of 1974. The Atomic Energy Commission is abolished. The Energy Research and Development Administration, Nuclear Regulatory Commission, and Energy Resources Council are established

  13. Congeneration and utilities: Status and prospects: Final report

    SciTech Connect (OSTI)

    Limaye, D.R.; Jacobs, L.; McDonald, C.

    1988-11-01

    The cogeneration industry has grown and changed considerably since the passage of the Public Utility Regulatory Policies Act (PURPA) in 1978. It has moved from infancy to a major industry that must be addressed in electric utility resource planning. This report examines the utility perspective on cogeneration. The report begins with a brief outline of the history of the US cogeneration industry, including an in-depth look at recent developments. An assessment of the industry as it currently stands is then presented. This assessment includes a look at who is cogenerating now and who is likely to be cogenerating in the future. It also includes an analysis of the key market sensitivities and how they affect the individuals who must make the decisions to cogenerate. These discussions provide a framework for the central issue addressed in the next section: the effect of cogeneration on the electric utilities. After the alternative responses to cogeneration are outlined, the report details the impacts of cogeneration on utility planning and policy. Special utility concerns relative to cogeneration are raised including potential ratemaking approaches, the issue of cogeneration reliability and approaches to planning for it, and the costs and benefits of cogeneration to non-participant ratepayers. Next the planning and economic benefits which can accrue from utility ownership of and participation in cogeneration projects are discussed in the context of cogeneration as an electric utility opportunity. The final sections of the report define and classify various types of cogeneration technologies and outline the current status of EPRI's cogeneration research. 21 figs., 22 tabs.

  14. Nuclear Regulatory legislation: 103d Congress. Volume 2, No. 3

    SciTech Connect (OSTI)

    1995-08-01

    This document is a compilation of nuclear regulatory legislation and other relevant material through the 103d Congress, 2d Session. This compilation has been prepared for use as a resource document, which the NRC intends to update at the end of every Congress. The contents of NUREG-0980 include the Atomic Energy Act of 1954, as amended; Energy Reorganization Act of 1974, as amended, Uranium Mill Tailings Radiation Control Act of 1978; Low-Level Radioactive Waste Policy Act; Nuclear Waste Policy Act of 1982; and NRC Authorization and Appropriations Acts. Other materials included are statutes and treaties on export licensing, nuclear non-proliferation, and environmental protection.

  15. Nuclear regulatory legislation: 102d Congress. Volume 1, No. 2

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    This document is a compilation of nuclear regulatory legislation and other relevant material through the 102d Congress, 2d Session. This compilation has been prepared for use as a resource document, which the NRC intends to update at the end of every Congress. The contents of NUREG-0980 include: The Atomic Energy Act of 1954, as amended; Energy Reorganization Act of 1974, as amended, Uranium Mill Tailings Radiation Control Act of 1978; Low-Level Radioactive Waste Policy Act; Nuclear Waste Policy Act of 1982; and NRC Authorization and Appropriations Acts. Other materials included are statutes and treaties on export licensing, nuclear non-proliferation, and environmental protection.

  16. Nuclear regulatory legislation, 102d Congress. Volume 2, No. 2

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    This document is a compilation of nuclear regulatory legislation and other relevant material through the 102d Congress, 2d Session. This compilation has been prepared for use as a resource document, which the NRC intends to update at the end of every Congress. The contents of NUREG-0980 include The Atomic Energy Act of 1954, as amended; Energy Reorganization Act of 1974, as amended, Uranium Mill Tailings Radiation Control Act of 1978; Low-Level Radioactive Waste Policy Act; Nuclear Waste Policy Act of 1982; and NRC Authorization and Appropriations Acts. Other materials included are statutes and treaties on export licensing, nuclear non-proliferation, and environmental protection.

  17. Nuclear Regulatory legislation: 103d Congress. Volume 1, No. 3

    SciTech Connect (OSTI)

    1995-08-01

    This document is a compilation of nuclear regulatory legislation and other relevant material through the 103d Congress, 2d Session. This compilation has been prepared for use as a resource document, which the NRC intends to update at the end of every Congress. The contents of NUREG-0980 include the Atomic Energy Act of 1954, as amended; Energy Reorganization Act of 1974, as amended, Uranium Mill Tailings Radiation Control Act of 1978; Low-Level Radioactive Waste Policy Act; Nuclear Waste Policy Act of 1982; and NRC Authorization and Appropriations Acts. Other materials included are statutes and treaties on export licensing, nuclear non-proliferation, and environmental protection.

  18. Utilization Graphs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    that use data from the PDSF batch scheduler (SGE) to show the utilization of the cluster over the past 24 hours. The graphs were generated with RRDTool and are updated...

  19. NUCLEAR REGULATORY COMMISSION

    Office of Environmental Management (EM)

    NUCLEAR REGULATORY COMMISSION 10 CFR Parts 71 and 73 RIN 3150-AG41 Advance Notification to Native American Tribes of Transportation of Certain Types of Nuclear Waste AGENCY: ...

  20. Nuclear Safety Regulatory Framework

    Energy Savers [EERE]

    Authority and responsibility to regulate nuclear safety at DOE facilities 10 CFR 830 10 CFR 835 10 CFR 820 Regulatory Implementation Nuclear Safety Radiological Safety Procedural ...

  1. Oregon Public Utility Commission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oregon Public Utility Commission Oregon Public Utility Commission Offer comments on the United States Department of Energy Smart Grid Request for Information (RFI). Oregon Public Utility Commission (330.3 KB) More Documents & Publications Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy- Request for Information Edison Electric Institute (EEI) Regulatory Burden RFI, 77 Fed. Reg. 47328 Comments of the American Public

  2. Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance

    SciTech Connect (OSTI)

    2012-03-01

    This document presents guidance for implementing the process that the U.S. Department of Energy (DOE) Office of Legacy Management (LM) will use for assuming perpetual responsibility for a closed uranium mill tailings site. The transition process specifically addresses sites regulated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) but is applicable in principle to the transition of sites under other regulatory structures, such as the Formerly Utilized Sites Remedial Action Program.

  3. Small Business Regulatory Enforcement Fairness Act Download | Department of

    Energy Savers [EERE]

    Small Business Program (Text Version) Small Business Program (Text Version) This is the text version for the images on the EERE Small Business Program page. North American Industry Classification System This pie chart shows the top ten North American Industry Classification System codes used by businesses working with the Department of Energy in September 2015. They are 541611: Administrative Management and General Management Consulting Services: $35,932,769; 541330: Engineering Services:

  4. Tribal Utility Formation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    I L L E P O W E R A D M I N I S T R A T I O N Tribal Utility Formation in the Bonneville Power Administration Service Territory Ken Johnston Acting Tribal Affairs Manager BPA TRIBAL AFFAIRS DEPARTMENT JULY 2015 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2 The Basics  BPA markets power from 31 Federal dams, the Columbia Generating Station Nuclear Plant, and several small non- Federal power plants  About 80% of the power BPA sells is hydroelectric  BPA accounts for about

  5. The Hanford Story: Recovery Act

    Broader source: Energy.gov [DOE]

    This is the third chapter of The Hanford Story. This chapter is a tribute to the thousands of workers and representatives of regulatory agencies, neighboring states, Tribes, stakeholders, and surrounding communities who came together to put stimulus funding to work at Hanford. The video describes how the Department of Energy and its contractors turned a nearly $2 billion investment of American Recovery and Reinvestment Act funding in 2009 into nearly $4 billion worth of environmental cleanup work over the past two years. At the same time, Hanford workers have reduced the cleanup footprint of the Hanford Site by more than half (586 square miles to 241 sq. mi. through August -- 59 percent).

  6. Nuclear Regulatory Commission Regulatory and Licensing Matters | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Regulatory Commission Regulatory and Licensing Matters Nuclear Regulatory Commission Regulatory and Licensing Matters GC-52 provides legal advice to DOE regarding Nuclear Regulatory Commission (NRC) regulatory and licensing matters of interest to DOE, either as an NRC license applicant or in connection with related authorities and responsibilities of DOE and NRC on nuclear material, nuclear waste, and nuclear nonproliferation matters. GC-52 attorneys provide advice and support on a

  7. Regulatory Burden RFI: Revitalization of DOE's Role as a Regulatory

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Watchdog | Department of Energy RFI: Revitalization of DOE's Role as a Regulatory Watchdog Regulatory Burden RFI: Revitalization of DOE's Role as a Regulatory Watchdog This Memorandum serves as an Executive Summary of Center for Regulatory Effectiveness' (CRE's) attached comments highlighting four issues: CRE_Response-DOE_Regulatory_Review_Request_for_Comments.pdf (283.1 KB) More Documents & Publications DOE Review of Regulations - Center for Regulatory Effectiveness Comments DOE Ex

  8. Phenylpropanoid related regulatory protein-regulatory region associations

    DOE Patents [OSTI]

    Apuya, Nestor; Bobzin, Steven Craig; Park, Joon-Hyun; Doukhanina, Elena

    2012-01-03

    Materials and methods for identifying lignin regulatory region-regulatory protein associations are disclosed. Materials and methods for modulating lignin accumulation are also disclosed.

  9. Competing Federal Utility Energy Service Contracts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Competing Federal Utility Energy Service Contracts Competing Federal Utility Energy Service Contracts Opening utility energy service contracts to competing franchised utility companies ensures federal agencies get the best value for their projects. Federal agencies are not legally required to compete for utility incentive services provided by the "established source" utility in the utility's franchised service territory. If services are available, the Energy Policy Act of 1992 states

  10. FAST ACTING CURRENT SWITCH

    DOE Patents [OSTI]

    Batzer, T.H.; Cummings, D.B.; Ryan, J.F.

    1962-05-22

    A high-current, fast-acting switch is designed for utilization as a crowbar switch in a high-current circuit such as used to generate the magnetic confinement field of a plasma-confining and heat device, e.g., Pyrotron. The device particularly comprises a cylindrical housing containing two stationary, cylindrical contacts between which a movable contact is bridged to close the switch. The movable contact is actuated by a differential-pressure, airdriven piston assembly also within the housing. To absorb the acceleration (and the shock imparted to the device by the rapidly driven, movable contact), an adjustable air buffer assembly is provided, integrally connected to the movable contact and piston assembly. Various safety locks and circuit-synchronizing means are also provided to permit proper cooperation of the invention and the high-current circuit in which it is installed. (AEC)

  11. TriUtils Trilinos Utilities Package

    Energy Science and Technology Software Center (OSTI)

    2011-09-26

    TriUtils is a package of utilities for other Trilinos packages. TriUtils contains utilities to perform common operations such as command line parsing, and input file reading.

  12. Reducing Regulatory Burden | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Request for information on reducing regulatory burden Reducing Regulatory Burden (177.64 KB) More Documents & Publications Reducing Regulatory Burden Reducing Regulatory Burden

  13. Informing Policymakers and Regulatory Support

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Informing Policymakers and Regulatory Support HomeStationary PowerNuclear EnergyNuclear ... Regulatory Gap Analysis Fact Sheet Quality Assurance Implementing systematic quality ...

  14. Overview of Utility Incentives Presentation to the Kansas Corporation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commission Energy Efficiency Incentives Workshop | Department of Energy Utility Incentives Presentation to the Kansas Corporation Commission Energy Efficiency Incentives Workshop Overview of Utility Incentives Presentation to the Kansas Corporation Commission Energy Efficiency Incentives Workshop RAP is a non-profit organization providing technical and educational assistance to government officials on energy and environmental issues. RAP Principals all have extensive utility regulatory

  15. Federal Utility Partnership Working Group Industry Commitment

    Broader source: Energy.gov [DOE]

    Investor-owned electric utility industry members of the Edison Electric Institute pledge to assist Federal agencies in achieving energy-saving goals. These goals are set in the Energy Policy Act of...

  16. The regulatory battleground: A briefing for commanders

    SciTech Connect (OSTI)

    Wirick, D.

    1995-12-31

    This imperfect analogy likens the history and current status of public utility regulation to a military campaign. Clearly, the relationship between regulators and utilities has not always been combative, but intermittent conflict has necessarily characterized the relationship. Nonetheless, this military analogy describes some of the elements of the history of regulation and may have implications for regulatory policy in the near term. The scene is a battlefield headquarters not far from the heat of the conflict. The commanders of regulatory units are gathered. In the distance, the low rumble of troop movements can be heard. Ladies and gentlemen, please take your seats. As you are aware, recent developments have placed regulatory forces in extreme jeopardy. Our forces are under stress, and though they continue to fight, the confusion of the current situation is beginning to take its toll. In most cases, reinforcements have been denied and our lines of logistical support have been weakened. Without effective and rapid action on our part, the regulatory battle will be lost and we will be driven from the field. Until consumers are well-enough armed to protect themselves, a process that is certainly suspect and potentially time-consuming, they will be powerless and undoubtedly victimized.

  17. Renewable energy and utility regulation

    SciTech Connect (OSTI)

    Not Available

    1991-04-10

    This report summarizes the results of a joint project on renewable energy of the National Association of Regulatory Utility Commissioners (NARUC) and the US DOE. NARUC'S Task Force on Renewable Energy conducted a review of the current state of renewable energy technologies to evaluate their potential and extract key policy lessons from experience already gained in deployment of these technologies in numerous states. The main focus of this effort has been to clarify how utility regulators affect the development of renewable energy resources. The goal of the project was twofold: (1) identify the factors that have led to success or failure or renewable energy technologies in various energy markets, and (2) to develop an agenda on renewable energy and utility regulation for NARUC and the DOE. This report consists of three sections: renewable energy contributions, costs and potential; factors affecting development of renewable energy resources; and a renewable energy agenda for NARUC.

  18. Renewable energy and utility regulation

    SciTech Connect (OSTI)

    Not Available

    1991-04-10

    This report summarizes the results of a joint project on renewable energy of the National Association of Regulatory Utility Commissioners (NARUC) and the US DOE. NARUC`S Task Force on Renewable Energy conducted a review of the current state of renewable energy technologies to evaluate their potential and extract key policy lessons from experience already gained in deployment of these technologies in numerous states. The main focus of this effort has been to clarify how utility regulators affect the development of renewable energy resources. The goal of the project was twofold: (1) identify the factors that have led to success or failure or renewable energy technologies in various energy markets, and (2) to develop an agenda on renewable energy and utility regulation for NARUC and the DOE. This report consists of three sections: renewable energy contributions, costs and potential; factors affecting development of renewable energy resources; and a renewable energy agenda for NARUC.

  19. Municipal Utilities' Investment in Smart Grid Technologies Improves...

    Office of Environmental Management (EM)

    Three municipal utilities that received funding through the Recovery Act Smart Grid Investment Grant program are featured in this report. Burbank, California; Glendale, California; ...

  20. Utility FGD survey, Janurary--December 1988

    SciTech Connect (OSTI)

    Hance, S.L.; McKibben, R.S.; Jones, F.M. )

    1991-09-01

    The Utility FGD Survey report, which is generated by a computerized data base management system, represents a survey of operational and planned domestic utility flue gas desulfurization (FGD) systems. It summarizes information contributed by the utility industry, system and equipment suppliers, system designers, research organizations, and regulatory agencies. The data cover system design, fuel characteristics, operating history, and actual system performance. Also included is a unit-by-unit discussion of problems and solutions associated with the boilers, scrubbers, and FGD systems. The development status (operational, under construction, or in the planning stages), system supplier, process, waste disposal practice, and regulatory class are tabulated alphabetically by utility company. Simplified process flow diagrams of FGD systems, definitions, and a glossary of terms are attached to the report. Current data for domestic FGD systems show systems in operation, systems under construction, and systems planned. The current total FGD-controlled capacity in the United States is 67,091 MW. 2 figs., 9 tabs.

  1. Utility FGD survey, January--December 1988

    SciTech Connect (OSTI)

    Hance, S.L.; McKibben, R.S.; Jones, F.M. )

    1991-09-01

    The Utility FGD Survey report, which is generated by a computerized data base management system, represents a survey of operational and planned domestic utility flue gas desulfurization (FGD) systems. It summarizes information contributed by the utility industry, system and equipment suppliers, systems designers, research organizations, and regulatory agencies. The data cover system design, fuel characteristics, operating history, and actual system performance. Also included is a unit-by-unit discussion of problems and solutions associated with the boilers, scrubbers, and FGD systems. The development status (operational, under construction, or in the planning stages), system supplier, process, waste disposal practice, and regulatory class are tabulated alphabetically by utility company. Simplified process flow diagrams of FGD systems, definitions, and a glossary of terms are attached to the report. Current data for domestic FGD systems show systems in operation, systems under construction, and systems planned. The current total FGD-controlled capacity in the United States is 67,091 MW.

  2. Utility FGD survey, January--December 1988

    SciTech Connect (OSTI)

    Hance, S.L.; McKibben, R.S.; Jones, F.M. )

    1991-09-01

    The Utility FGD Survey report, which is generated by a computerized data base management system, represents a survey of operational and planned domestic utility flue gas desulfurization (FGD) systems. It summarizes information contributed by the utility industry, system and equipment suppliers, system designers, research organizations, and regulatory agencies. The data cover system design, fuel characteristics, operating history, and actual system performance. Also included is a unit-by-unit discussion of problems and solutions associated with the boilers, scrubbers, and FGD systems. The development status (operational, under construction, or in the planning stages), system supplier, process, waste disposal practice, and regulatory class are tabulated alphabetically by utility company. Simplified process flow diagrams of FGD systems, definitions, and a glossary of terms are attached to the report. Current data for domestic FGD systems show systems in operation, systems under construction, and systems planned. The current total FGD-controlled capacity in the United States is 67,091 MW.

  3. Atomic Energy Act and Related Legislation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Atomic Energy Act and Related Legislation Atomic Energy Act and Related Legislation Purpose and Organization The purpose of the Atomic Energy Act (42 U.S.C. Sect. 2011 - Sect. 2259) (AEA) is to assure the proper management of source, special nuclear, and byproduct material. The AEA and the statutes that amended it delegate the control of nuclear energy primarily to DOE, the Nuclear Regulatory Commission (NRC) , and the Environmental Protection Agency (EPA). DOE authority extends to: source

  4. Solar: A Clean Energy Source for Utilities (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2010-09-01

    The fact sheet summarizes the goals and activities of the DOE Solar Energy Technologies Program efforts with utilities to remove the technical, regulatory, and market challenges they face in deploying solar technologies.

  5. State reactions to Title IV of the 1990 Clean Air Act Amendments

    SciTech Connect (OSTI)

    Miller, D.A.

    1995-12-01

    The Clean Air Act Amendments of 1990 represents a bold step in application of environmental regulation. By setting up a national free market in sulfur dioxide emission allowances, Congress has adopted the position that environmental protection and good economics are not necessarily in opposition. In fact, by carefully crafting legislation these two goals may work in aide of each other. Title IV is intended to achieve a significant reduction in the incidence of acid rain at minimal cost for the nation as a whole. On the other hand, states have traditionally had the greater responsibility for direct regulation of electric utility operations. A national free market in pollution is not welcomed by many state regulatory agencies. Some states are concerned about losing in-state markets for coal; others are unwilling to {open_quotes}import{close_quotes} pollution through the purchase of allowances. A number of states have reacted by passing regulations which limit utilities` choices in developing compliance plans. The Illinois Coal Act, for example, specifically requires two of the largest Illinois coal-fired power plants to install scrubbers and prohibits any plant from reducing its use of Illinois-mined coal by more than 10 percent per year. In December of 1993 the U.S. District Court for the Northern District of Illinois ruled, in the case of Alliance for Clean Coal v. Craig, that the Illinois Coal Act violates the Commerce Clause of the U.S. Constitution and permanently enjoined the Illinois Commerce Commission from enforcing it. The state appealed that decision but in January of 1995 the U.S. Court of Appeals for the Seventh Circuit upheld the District Court`s opinion. This paper will show that the argument that should be of particular interest from an economics perspective. Finally, the paper will attempt to draw conclusions regarding how state regulators may legitimately integrate the trading of emission allowances into their current regulatory schemes.

  6. Powerplant productivity improvements and regulatory incentives

    SciTech Connect (OSTI)

    Hardy, D; Brown, D

    1980-10-27

    The purpose of this study was to examine the benefits to be gained from increased powerplant productivity and to validate and demonstrate the use of incentives within the regulatory process to promote the improvement of powerplant productivity. The system-wide costs savings to be gained from given productivity improvement scenarios are estimated in both the short and long term. Numerous reports and studies exist which indicate that productivity improvements at the powerplant level are feasible and cost effective. The efforts of this study widen this focus and relate system-wide productivity improvements with system-wide cost savings. The initial thrust of the regulatory section of this study is to validate the existence of reasonable incentive procedures which would enable regulatory agencies to better motivate electric utilities to improve productivity on both the powerplant and system levels. The voluntary incentive format developed in this study was designed to facilitate the link between profit and efficiency which is typically not clear in most regulated market environments. It is concluded that at the present time, many electric utilities in this country could significantly increase the productivity of their base load units, and the adoption of an incentive program of the general type recommended in this study would add to rate of return regulation the needed financial incentives to enable utilities to make such improvements without losing long-run profit. In light of the upcoming oil import target levels and mandatory cutbacks of oil and gas as boiler fuels for electric utilities, the use of incentive programs to encourage more efficient utilization of coal and nuclear base load capacity will become far more inviting over the next two decades.

  7. Reducing Regulatory Burden | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Burden Reducing Regulatory Burden Request for information on reducing regulatory burden Reducing Regulatory Burden (289.74 KB) More Documents & Publications Reducing Regulatory Burden; Retrospective Review Under E.O. 13563 SEVENTH RFI COMMENTS ON REDUCING REGULATORY BURDEN

  8. Two regional regulatory meetings on distributed resources. Final technical report

    SciTech Connect (OSTI)

    2001-02-01

    An overview and discussion of Eastern Regional and Western Regional State Utility Regulators Workshops on Distributed Resources (DR) is given. The purpose of the workshops was for state regulators to learn about DR and the regulatory issues surrounding their greater use. The following issues were addressed: introduction to DR technologies and their potential benefits, interconnection and market barriers, regulatory incentives, rate design issues, and environmental issues.

  9. Federal Utility Partnership Working Group Utility Partners

    Broader source: Energy.gov [DOE]

    Federal Utility Partnership Working Group (FUPWG) utility partners are eager to work closely with Federal agencies to help achieve energy management goals.

  10. Federal Utility Partnership Working Group - Utility Interconnection...

    Energy Savers [EERE]

    Federal Utility Partnership Working Group (FUPWG) meeting-discusses solarphotovoltaic (PV) projects to connect with utility in California and their issues. fupwgfall12jewell.pd...

  11. Optimal Electric Utility Expansion

    Energy Science and Technology Software Center (OSTI)

    1989-10-10

    SAGE-WASP is designed to find the optimal generation expansion policy for an electrical utility system. New units can be automatically selected from a user-supplied list of expansion candidates which can include hydroelectric and pumped storage projects. The existing system is modeled. The calculational procedure takes into account user restrictions to limit generation configurations to an area of economic interest. The optimization program reports whether the restrictions acted as a constraint on the solution. All expansionmore » configurations considered are required to pass a user supplied reliability criterion. The discount rate and escalation rate are treated separately for each expansion candidate and for each fuel type. All expenditures are separated into local and foreign accounts, and a weighting factor can be applied to foreign expenditures.« less

  12. Recovery Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act Recovery Act More Documents & Publications Overview of Recovery Act FAR Clauses Map Data: Recovery Act Funding DOE Policy Re Recovery Act Recipient Use of Recovery Act Logos on Signage

  13. H. R. 1301: A bill to implement the National Energy Strategy Act, and for other purposes, introduced in the US House of Representatives, One Hundred Second Congress, First Session, March 6, 1991

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    This bill contains the following: Title I - Residential, commercial, and Federal energy use: consumer and commercial products, and Federal energy management; Title II - Natural gas: natural gas pipeline regulatory reform, natural gas import/export deregulation, and structural reform of the Federal Energy Regulatory Commission; Title III - Oil: Alaska coastal plain oil and gas leasing, Naval Petroleum Reserve leasing, and oil pipeline deregulation; Title IV - Electricity generation and use: Public Utility Holding Company Act reform, and power marketing administration repayment reform; Title V - Nuclear power: licensing reform, nuclear waste management; Title VI - Renewable energy: PURPA size cap and co-firing reform, and hydroelectric power regulatory reform; Title VII - Alternative fuel: alternative and dual fuel vehicle credits, and alternative transportation fuels; Title VIII - Innovation and technology transfer; Title IX - Tax incentives.

  14. Utilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Utilities Utilities Below are resources for Tribes about utilities. The Economics of Electric System Municipalization Looks at the economic environment in California to determine ...

  15. Utility FGD survey, January--December 1989

    SciTech Connect (OSTI)

    Hance, S.L.; McKibben, R.S.; Jones, F.M. )

    1992-03-01

    This is Volume 2 part 2, of the Utility flue gas desulfurization (FGD) Survey report, which is generated by a computerized data base management system, represents a survey of operational and planned domestic utility flue gas desulfurization (FGD) systems. It summarizes information contributed by the utility industry, system and equipment suppliers, system designers, research organizations, and regulatory agencies. The data cover system design, fuel characteristics, operating history, and actual system performance. Also included is a unit-by-unit discussion of problems and solutions associated with the boilers, scrubbers, and FGD systems. This volume particularly contains basic design and performance data.

  16. American Reinvestment Recovery Act | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Energy American Recovery and Reinvestment Act of 2009 CSP Awards In 2009, DOE announced six concentrating solar power (CSP) projects funded under the American Recovery and Reinvestment Act (ARRA) of 2009. The following projects were selected under this competitive solicitation: Argonne National Laboratory: Dual-Purpose Heat Transfer Fluids for CSP Los Alamos National Laboratory: Hybrid Organic Silicone HTF Utilizing Endothermic Chemical Reactions for Latent Heat Storage National Renewable

  17. Re: Regulatory Burden RFI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulatory Burden RFI Re: Regulatory Burden RFI Hearth Patio & Barbecue Association comments on Regulatory Burden RFI Re: Regulatory Burden RFI (74.36 KB) More Documents & Publications Department of Energy Request for Information: Reducing Regulatory Burden (Reply Comments) .Hearth, Patio & Barbecue Association's Comments on DOE's Regulatory Burden RFI Regulatory Reduction RFI, 76 Fed. Reg. 6123, February 3, 2011

  18. FOIA, The Privacy Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FOIA, the Privacy Act Your Rights under the FOIA, the Privacy Act, and other Privacy Laws The Freedom of Information Act and Privacy Act Division/Office is responsible for administering policies, programs, and procedures to ensure DOE compliance with the Freedom of Information Act (FOIA) and the Privacy Act (PA), 5 U.S.C. 552 and 5 U.S.C. 552a, respectively. The resources on these pages are provided to aid in finding answers to your questions about programs of the Department of Energy and to

  19. regulatory | OpenEI Community

    Open Energy Info (EERE)

    regulatory Home Graham7781's picture Submitted by Graham7781(2017) Super contributor 5 August, 2013 - 13:18 Geothermal Regulatory Roadmap featured on NREL Now geothermal NREL...

  20. Confidential data in a competitive environment: Setting a regulatory agenda

    SciTech Connect (OSTI)

    Vine, E.

    1997-04-01

    Utilities will be reluctant to share data that gives them a competitive advantage over competitors. For exactly that reason, regulators should be more proactive in reviewing and revising, if need be, their policies with respect to the confidentiality of that data. Historically, the electric utility industry has been regarded as one of the most open industries in the United States in terms of inter-company sharing of information and conducting joint research and development activities. But as the prospect of competition among electricity power providers has increased in recent years, investor-owned utilities have become concerned that their competitors will desire access to energy-related data that they may regard as proprietary or confidential. As a result, many utilities are now requesting that the data they submit to their utility regulatory commissions remain confidential. As noted in the discussion below, withholding utility information from the public is likely to have significant policy implications with respect to such matters as: (1) consumer education, the pursuit of truth, mutual respect among parties, and social cooperation; (2) creation of a fair market for competitive energy services; (3) the regulatory balance; (4) regional and national assessments of energy-savings opportunities; (5) research and development; and (6) evaluations of utility programs, plans, and policies. In response to these concerns, in late 1995 and early 1996 the author conducted a survey of state public utility commissions in the U.S. to assess: (1) the relative importance of the issue of confidential data in the regulatory arena; (2) the regulatory response to utility requests for confidentiality (e.g., formal policies, guidelines, rules and procedures, and decisions); and (3) the type of data filed as confidential with PUCs. In this article, the author focus on only the first two objectives of this study.

  1. NET PRED UTILITY

    Energy Science and Technology Software Center (OSTI)

    002602IBMPC00 Normalized Elution Time Prediction Utility http://omics.pnl.gov/software/NETPredictionUtility.php

  2. Regulatory Requirements | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regulatory Requirements Executive Order 13423, Strengthening Federal Environment, Energy, and Transportation Management (January 26, 2007) and Executive Order 13514, Federal...

  3. Nuclear Regulatory Commission information digest

    SciTech Connect (OSTI)

    None,

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  4. Regulatory Burden RFI | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    and in making its regulatory program more effective and less burdensome. Regulatory Burden RFI More Documents & Publications Regulatory Burden RFI from AHRI Air-Conditioning,...

  5. Washington Coastal Zone Management Regulatory Handbook | Open...

    Open Energy Info (EERE)

    to library PermittingRegulatory Guidance - GuideHandbook: Washington Coastal Zone Management Regulatory HandbookPermittingRegulatory GuidanceGuideHandbook Author Washington...

  6. Privacy Act of 1974; Publication of Compilation of Privacy Act...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Privacy Act of 1974; Publication of Compilation of Privacy Act Systems of Records Privacy Act of 1974; Publication of Compilation of Privacy Act Systems of Records Privacy Act of ...

  7. Intergovernmental Personnel Act Assignments

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-08-24

    This Manual implements provisions of the Intergovernmental Personnel Act (IPA) within the Department of Energy (DOE) and establishes requirements, responsibilities, and authority for effecting assignments under the Act. Does not cancel other directives.

  8. Recovery Act Milestones

    ScienceCinema (OSTI)

    Rogers, Matt

    2013-05-29

    Every 100 days, the Department of Energy is held accountable for a progress report on the American Recovery and Reinvestment Act. Update at 200 days, hosted by Matt Rogers, Senior Advisor to Secretary Steven Chu for Recovery Act Implementation.

  9. Fast-acting valve actuator

    DOE Patents [OSTI]

    Cho, Nakwon

    1980-01-01

    A fast-acting valve actuator utilizes a spring driven pneumatically loaded piston to drive a valve gate. Rapid exhaust of pressurized gas from the pneumatically loaded side of the piston facilitates an extremely rapid piston stroke. A flexible selector diaphragm opens and closes an exhaust port in response to pressure differentials created by energizing and de-energizing a solenoid which controls the pneumatic input to the actuator as well as selectively providing a venting action to one side of the selector diaphragm.

  10. ACT-ARA

    Energy Science and Technology Software Center (OSTI)

    003092IBMPC00 ACT-ARA: Code System for the Calculation of Changes in Radiological Source Terms with Time

  11. Federal Utility Partnership Working Group Industry Commitment | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Group Industry Commitment Federal Utility Partnership Working Group Industry Commitment Investor-owned electric utility industry members of the Edison Electric Institute pledge to assist Federal agencies in achieving energy-saving goals. These goals are set in the Energy Policy Act of 1992 and subsequent executive orders. Federal agencies can contact Federal Utility Partnership Working Group utility partners for more information on assistance. Electric Utility Industry Pledge

  12. Reshaping the electric utility industry: Competitive implications for Illinois

    SciTech Connect (OSTI)

    Maschoff, D.C.

    1995-12-31

    This paper briefly outlines some of the issues in the electric power industry restructuring. In addition, the impacts of these changes on the energy marketplace are discussed. Federal policy initiatives, state regulatory response, and utility management response are each described. Management skills are identified as the critical success factor for competition in the utility market.

  13. Legal & regulatory issues affecting participation in distributed resource markets

    SciTech Connect (OSTI)

    Nimmons, J.T.

    1996-12-31

    This paper describes recent research co-sponsored by the National Renewable Energy Laboratory and four investor-owned utilities. Its purpose was to investigate how legal and regulatory factors will shape strategic decisions on the roles of utilities and others in the development of distributed resources. The work was performed during 1995 and early 1996 by John Nimmons & Associates, with support from Thomas J. Starts, Energy & Environmental Economics, and Awad & Singer.

  14. Interstate Technology & Regulatory Council (ITRC) Remediation...

    Office of Environmental Management (EM)

    Interstate Technology & Regulatory Council (ITRC) Remediation Management of Complex Sites: Case Studies and Guidance Interstate Technology & Regulatory Council (ITRC) Remediation ...

  15. Paducah Regulatory Approach | Department of Energy

    Office of Environmental Management (EM)

    Environmental Remediation Paducah Regulatory Approach Paducah Regulatory Approach Past uranium enrichment operations and support activities generated hazardous, radioactive, ...

  16. Implementation of subsidence control regulatory requirements

    SciTech Connect (OSTI)

    Barkley, D.

    1999-07-01

    Underground coal mining in Illinois has shown an increasing percentage of total coal mined relative to surface mining. In the past 20 years, the percentage of underground to surface mine production has steadily increased. Underground mining is expected to continue to dominate Illinois coal production into the 21st century. The drive for higher production and lower operating costs should increase the number of longwall and high extraction retreat mines. This will be achieved through conversion of existing room and pillar mines or initiation of new underground mining operations. The environmental regulations that govern the mitigation of surface impacts have evolved at both the state and federal level. Federal regulations passed in 1995 modifying the Surface Mining Control and Reclamation Act mandated additional restrictions and regulatory requirements beyond those adopted in 1977. State regulatory bodies that implement the regulations are now working to bring their regulations and procedures into compliance with the oversight federal counterpart. many states have raised concerns over the practical application of certain aspects of the new permitting requirements. This paper describes past and present subsidence regulations in Illinois, their impact on the coal industry and on the landowners above underground coal mining. Potential problems in implementation of the new regulatory requirements as well as additional burdens placed on coal companies to comply with the regulations are explored.

  17. NARUC Releases Cybersecurity Primer for Utility Regulators (June 2012) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy NARUC Releases Cybersecurity Primer for Utility Regulators (June 2012) NARUC Releases Cybersecurity Primer for Utility Regulators (June 2012) June 14, 2012 - 4:50pm Addthis The National Association of Regulatory Utility Commissioners (NARUC) has released "Cybersecurity for State Regulators," a primer that explains conceptual cybersecurity basics and points to additional resources that can help regulators develop internal cybersecurity expertise, ask questions

  18. DOE regulatory reform initiative vitrified mixed waste

    SciTech Connect (OSTI)

    Carroll, S.J.; Holtzscheiter, E.W.; Flaherty, J.E.

    1997-12-31

    The US Department of Energy (DOE) is charged with responsibly managing the largest volume of mixed waste in the United States. This responsibility includes managing waste in compliance with all applicable Federal and State laws and regulations, and in a cost-effective, environmentally responsible manner. Managing certain treated mixed wastes in Resource Conservation and Recovery Act (RCRA) permitted storage and disposal units (specifically those mixed wastes that pose low risks from the hazardous component) is unlikely to provide additional protection to human health and the environment beyond that afforded by managing these wastes in storage and disposal units subject to requirements for radiological control. In October, 1995, the DOE submitted a regulatory reform proposal to the Environmental Protection Agency (EPA) relating to vitrified mixed waste forms. The technical proposal supports a regulatory strategy that would allow vitrified mixed waste forms treated through a permit or other environmental compliance mechanism to be granted an exemption from RCRA hazardous waste regulation, after treatment, based upon the inherent destruction and immobilization capabilities of vitrification technology. The vitrified waste form will meet, or exceed the performance criteria of the Environmental Assessment (EA) glass that has been accepted as an international standard for immobilizing radioactive waste components and the LDR treatment standards for inorganics and metals for controlling hazardous constituents. The proposal further provides that vitrified mixed waste would be responsibly managed under the Atomic Energy Act (AEA) while reducing overall costs. Full regulatory authority by the EPA or a State would be maintained until an acceptable vitrified mixed waste form, protective of human health and the environment, is produced.

  19. Utility Potential Calculator

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for Potential Studies in the Northwest V1.0 Utility Potential Calculator V1.0 for Excel 2007 Utility Potential Calculator V1.0 for Excel 2003 Note: BPA developed the Utility...

  20. Proceedings of the distributed utility valuation project institutional issues workshop

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    These proceedings summarize the discussions during a one-day working session on institutional issues related to the distributed utility (DU) concept. The purpose of the session was to provide an initial assessment of the {open_quotes}institutional{close_quotes} issues, including legal, regulatory, industry structure, utility organization, competition, and related matters that may affect the development and the relationships among distributed utility stakeholders. The assessment was to identify institutional barriers to utilities realizing benefits of the distributed concept (should these benefits be confirmed), as well as to identify opportunities for utilities and other stakeholders for moving ahead to more easily capture these benefits.

  1. Regulatory issues for deep borehole plutonium disposition

    SciTech Connect (OSTI)

    Halsey, W.G.

    1995-03-01

    As a result of recent changes throughout the world, a substantial inventory of excess separated plutonium is expected to result from dismantlement of US nuclear weapons. The safe and secure management and eventual disposition of this plutonium, and of a similar inventory in Russia, is a high priority. A variety of options (both interim and permanent) are under consideration to manage this material. The permanent solutions can be categorized into two broad groups: direct disposal and utilization. The deep borehole disposition concept involves placing excess plutonium deep into old stable rock formations with little free water present. Issues of concern include the regulatory, statutory and policy status of such a facility, the availability of sites with desirable characteristics and the technologies required for drilling deep holes, characterizing them, emplacing excess plutonium and sealing the holes. This white paper discusses the regulatory issues. Regulatory issues concerning construction, operation and decommissioning of the surface facility do not appear to be controversial, with existing regulations providing adequate coverage. It is in the areas of siting, licensing and long term environmental protection that current regulations may be inappropriate. This is because many current regulations are by intent or by default specific to waste forms, facilities or missions significantly different from deep borehole disposition of excess weapons usable fissile material. It is expected that custom regulations can be evolved in the context of this mission.

  2. Utility Partnerships Program Overview

    Broader source: Energy.gov (indexed) [DOE]

    Management Program (FEMP) Utility Partnerships Program fosters effective partnerships between federal agencies and their local serving utility. FEMP works to reduce the cost ...

  3. ARM - Recovery Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... In other Recovery Act news, the remote balloon launcher was ... new aerosols observation systems passed acceptance testing ... By moving to the fast-switching dual polarization technology...

  4. Price-Anderson Act

    Broader source: Energy.gov [DOE]

    The Price-Anderson Act (PAA) provides a system of indemnification for legal liability resulting from a nuclear incident in connection with contractual activity for DOE.

  5. EM Recovery Act Performance

    Broader source: Energy.gov [DOE]

    The Office of Environmental Management's (EM) American Recovery and Reinvestment Act Program recently achieved 74 percent footprint reduction, exceeding the originally established goal of 40...

  6. Recovery Act Open House

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    light snacks for those attending. DOE ID Manager Rick Provencher discusses the non-cleanup work that was accomplished with Recovery Act funding. Editorial Date November 15, 2010...

  7. Regulatory impact analysis for the petroleum refineries neshap. Draft report

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    The report analyzes the regulatory impacts of the Petroleum Refinery National Emission Standard for Hazardous Air Pollutants (NESHAP), which is being promulgated under Section 112 of the Clean Air Act Amendments of 1990 (CCA). This emission standard would regulate the emissions of certain hazardous air pollutants (HAPs) from petroleum refineries. The petroleum refineries industry group includes any facility engaged in the production of motor gasoline, naphthas, kerosene, jet fuels, distillate fuel oils, residual fuel oils, lubricants, or other products made from crude oil or unfinished petroleum derivatives. The report analyzes the impact that regulatory action is likely to have on the petroleum refining industry.

  8. Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    110 Federal Register / Vol. 80, No. 108 / Friday, June 5, 2015 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL15-69-000] Acciona Wind Energy USA LLC v. Midcontinent Independent System Operator, Inc.; Notice of Complaint Take notice that on May 27, 2015, pursuant to section 206 of the Federal Power Act, U.S.C. 824(e) and Rule 206 of the Federal Energy Regulatory Commission's (Commission) Rules of Practice and Procedure, 18 CFR 385.206, Acciona Wind Energy USA

  9. Two Recovery Act Funding Case Studies Now Available

    Broader source: Energy.gov [DOE]

    Utilities across America are using Recovery Act funds and smart grid technologies to deliver more reliable and affordable power, recover from major storms, and improve operations. Two case studies are now available.

  10. Environmental guidance regulatory bulletin

    SciTech Connect (OSTI)

    1997-01-31

    This document describes the background on expanding public participation in the Resource Conservation and Recovery Act and DOE`s response. The bulletin also describes the changes made by the final rule to existing regulations, guidance provided by EPA in the preamble and in the revised RCRA Public Participation Manual, the relationship between public participation and environmental justice, and DOE`s recent public participation and environmental justice initiatives.

  11. Utility Partnership Program Utility Partners | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Heuser Kentucky Northeast Utilities Marge Howell 860-280-2510 Connecticut, Massachusetts, New Hampshire NSTAR Robert Laurence 800-592-2000 Massachusetts Oklahoma Gas & Electric Co. ...

  12. Identifying Synonymous Regulatory Elements in Vertebrate Genomes

    SciTech Connect (OSTI)

    Ovcharenko, I; Nobrega, M A

    2005-02-07

    Synonymous gene regulation, defined as driving shared temporal and/or spatial expression of groups of genes, is likely predicated on genomic elements that contain similar modules of certain transcription factor binding sites (TFBS). We have developed a method to scan vertebrate genomes for evolutionary conserved modules of TFBS in a predefined configuration, and created a tool, named SynoR that identify synonymous regulatory elements (SREs) in vertebrate genomes. SynoR performs de novo identification of SREs utilizing known patterns of TFBS in active regulatory elements (REs) as seeds for genome scans. Layers of multiple-species conservation allow the use of differential phylogenetic sequence conservation filters in the search of SREs and the results are displayed as to provide an extensive annotation of genes containing detected REs. Gene Ontology categories are utilized to further functionally classify the identified genes, and integrated GNF Expression Atlas 2 data allow the cataloging of tissue-specificities of the predicted SREs. We illustrate how this new tool can be used to establish a linkage between human diseases and noncoding genomic content. SynoR is publicly available at http://synor.dcode.org.

  13. Utilizing the market to control sulfur dioxide emissions

    SciTech Connect (OSTI)

    Loeher, C.F. III

    1995-12-01

    Environmental policy in the United States is evolving; command and control approaches are being slowly replaced with market-based incentives. Market-based regulation is favorable because it provides the regulated community with flexibility in choosing between pollution control options. A recent application of a market-based approach is Title IV of the 1990 Clean Air Act Amendments. This paper evaluates the advantages of utilizing market-based incentives to control sulfur dioxide emissions. The evaluation embodies an extensive methodology, which provides an overview of the policy governing air quality, discusses pollution control philosophies and analyzes their associated advantages and limitations. Further, it describes the development and operation of a market for emissions trading, impediments to the market, and recommends strategies to improve the market. The evaluation concludes by analyzing the results of five empirical simulations demonstrating the cost-effectiveness of employing market-based incentives versus command-and-control regulation for controlling sulfur dioxide emissions. The results of the evaluation indicate that regulatory barriers and market impediments have inhibited allowance trading. However, many of these obstacles have been or are being eliminated through Federal and state regulations, and through enhancement of the market. Results also demonstrate that sulfur dioxide allowance trading can obtain identical levels of environmental protection as command-and-control approaches while realizing cost savings to government and industry.

  14. The Utility Management Conference

    Broader source: Energy.gov [DOE]

    The Utility Management Conference™ 2016 in San Diego is the place to be for leading utility and consulting staff. The technical program has been expanded to 36 sessions running in four concurrent rooms in order to provide utility leaders with the latest tools, techniques, best practices, and emerging solutions you need for effective utility management. This event will empower attendees, leading the water sector “On the Road to the Utilities of the Future.”

  15. OE Recovery Act News

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    benefits, and lessons learned from utility smart grid projects and to exchange information about future challenges and opportunities. The summary of conference proceedings,...

  16. A Case Study of Danville Utilities: Utilizing Industrial Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Study of Danville Utilities: Utilizing Industrial Assessment Centers to Provide Energy Efficiency Resources for Key Accounts A Case Study of Danville Utilities: Utilizing ...

  17. Legal and regulatory issues affecting aquifer thermal energy storage

    SciTech Connect (OSTI)

    Hendrickson, P.L.

    1981-10-01

    This document updates and expands the report with a similar title issued in October 1980. This document examines a number of legal and regulatory issues that potentially can affect implementation of the aquifer thermal energy storage (ATES) concept. This concept involves the storage of thermal energy in an underground aquifer until a later date when it can be effectively utilized. Either heat energy or chill can be stored. Potential end uses of the energy include district space heating and cooling, industrial process applications, and use in agriculture or aquaculture. Issues are examined in four categories: regulatory requirements, property rights, potential liability, and issues related to heat or chill delivery.

  18. Freedom of Information Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Privacy Act must be signed and, therefore, cannot be submitted on this form. l DATE Name Richard van Dijk Email Orga nizati - on Mailin g Addre ss City 01 4 State I P Phon e Ex....

  19. Paperwork Reduction Act

    Broader source: Energy.gov [DOE]

    The Paperwork Reduction Act requires that all federal websites request permission from the Office of Management and Budget (OMB) before collecting information from 10 or more members of the public....

  20. River and Harbors Act

    Broader source: Energy.gov [DOE]

    Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) prohibits the unauthorized obstruction or alteration of any navigable water of the United States.

  1. Freedom of Information Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    S (BPA) - NN-1 Cc: Shay, Don Subject: Request for Corona and Field Effects Program Hi Kim, Pursuant to the Freedom of Information Act, I would like to request a copy of...

  2. Recovery Act Milestones

    Broader source: Energy.gov [DOE]

    Every 100 days, the Department of Energy is held accountable for a progress report on the American Recovery and Reinvestment Act. Update at 200 days, hosted by Matt Rogers, Senior Advisor to...

  3. John K. Medici (Acting)

    Office of Energy Efficiency and Renewable Energy (EERE)

    Mr. John K. Medici serves as the (Acting) Deputy Chief Information Officer (OCIO) for Cybersecurity for the Department of Energy (DOE).  He has over 18 years of technical implementation and...

  4. Freedom of Information Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    02, 2014 1:45 PM Submitted by Anonymous User This message was created by a Microsoft InfoPath form. The form data may be included as an attachment. Freedom of Information Act...

  5. Energy and Water Act

    Broader source: Energy.gov (indexed) [DOE]

    Letter 2004-02 - FY 2004 Le2islation Provisions (dated March 1.2004) Energy and Water Act AL-2004-02 provides guidance regarding the implementation of Section 30 I. 304....

  6. Federal Utility Partnership Working Group Meeting: Washington Update

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentationgiven at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meetingdiscusses the Federal Buildings Personnel Training Act of 2010, Commit to Efficiency campaign, customer service, other Federal Energy Management Program (FEMP) activities, and more.

  7. Avista Utilities- Net Metering

    Broader source: Energy.gov [DOE]

    For Avista Utilities customers, any net excess generation (NEG) during a monthly billing period is credited to the customer's next bill at the utility's retail rate. At the beginning of each ca...

  8. Electrical utilities relay settings

    SciTech Connect (OSTI)

    HACHE, J.M.

    1999-02-24

    This document contains the Hanford transmission and distribution system relay settings that are under the control of Electrical Utilities.

  9. Utility Partnerships Program Overview

    SciTech Connect (OSTI)

    2014-10-03

    Document describes the Utility Partnerships Program within the U.S. Department of Energy's Federal Energy Management Program.

  10. Regulatory Review Comment Section | Department of Energy

    Office of Environmental Management (EM)

    Radiation Protection of the Public and the Environment Regulatory Review Comment Section Regulatory Review Comment Section DOE Comments on Radiation Protection (Atomic Energy ...

  11. EAC Recommendations Regarding Emerging and Alternative Regulatory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    focused on the concepts of regulatoryutility business models. The paper includes a summary of regulatory model initiatives, current and emerging regulatory models, and ...

  12. General Construction and Environmental Regulatory Support at...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    General Construction and Environmental Regulatory Support at the Los Alamos National Laboratory General Construction and Environmental Regulatory Support at the Los Alamos National ...

  13. Nuclear Regulatory Commission | Department of Energy

    Office of Environmental Management (EM)

    Commission Nuclear Regulatory Commission Nuclear Regulatory Commission (25.98 KB) More Documents & Publications What to Expect When Readying to Move Spent Nuclear Fuel from ...

  14. Policy and Regulatory Environment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Soft Costs Policy and Regulatory Environment Policy and Regulatory Environment Photo of a man speaking while seated at a table with men and women surrounding him. A favorable ...

  15. Regulatory Considerations for Developing Distributed Generation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulatory Considerations for Developing Distributed Generation Projects Webinar May 23, 2012 Regulatory Considerations for Developing Distributed Generation Projects Webinar May 23, ...

  16. Regulatory Considerations for Developing Distributed Generation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Distributed Generation Projects Webinar May 23, 2012 Regulatory Considerations for Developing Distributed Generation Projects Webinar May 23, 2012 Document covers the Regulatory ...

  17. Handbook of evaluation of utility DSM programs

    SciTech Connect (OSTI)

    Hirst, E.; Reed, J.; Bronfman, B.; Fitzpatrick, G.; Hicks, E.; Hirst, E.; Hoffman, M.; Keating, K.; Michaels, H.; Nadel, S.; Peters, J.; Reed, J.; Saxonis, W.; Schoen, A.; Violette, D.

    1991-12-01

    Program evaluation has become a central issue in the world of utility integrated resource planning. The DSM programs that utilities were operating to meet federal requirements or to improve customer relations are now becoming big business. DSM is being considered an important resource in a utility`s portfolio of options. In the last five years, the amount of money that utilities have invested in DSM has grown exponentially in most regulatory jurisdictions. Market analysts are now talking about DSM being a $30 billion industry by the end of the decade. If the large volume of DSM-program investments was not enough to highlight the importance of evaluation, then the introduction of regulatory incentives has really focused the spotlight. This handbook was developed through a process that involved many of those people who represent the diverse constituencies of DSM-program evaluation. We have come to recognize the many technical disciplines that must be employed to evaluate DSM programs. An analysis might start out based on the principles of utility load research to find out what happened, but a combination of engineering and statistical methods must be used to ``triangulate`` an estimate of what would have happened without the program. The difference, of course, is that elusive but prized result of evaluation: what happened as the direct result of the DSM program. Technical performance of DSM measures is not the sole determinant of the answer, either. We also recognize the importance of such behavioral attributes of DSM as persistence and free ridership. Finally, DSM evaluation is meaningless without attention to planning an approach, communicating results to relevant decision-makers, and focusing as much on the process as the impacts of the program. These topics are all covered in this handbook.

  18. OpenEI Community - regulatory

    Open Energy Info (EERE)

    Now http:en.openei.orgcommunitybloggeothermal-regulatory-roadmap-featured-nrel-now

    Navigating the complex system of federal and...

  19. Regulatory facility guide for Ohio

    SciTech Connect (OSTI)

    Anderson, S.S.; Bock, R.E.; Francis, M.W.; Gove, R.M.; Johnson, P.E.; Kovac, F.M.; Mynatt, J.O.; Rymer, A.C.

    1994-02-28

    The Regulatory Facility Guide (RFG) has been developed for the DOE and contractor facilities located in the state of Ohio. It provides detailed compilations of international, federal, and state transportation-related regulations applicable to shipments originating at destined to Ohio facilities. This RFG was developed as an additional resource tool for use both by traffic managers who must ensure that transportation operations are in full compliance with all applicable regulatory requirements and by oversight personnel who must verify compliance activities.

  20. The NEPA mandate and federal regulation of the natural gas industry. [NEPA (National Environmental Policy Act)

    SciTech Connect (OSTI)

    Hoecker, J.J.

    1992-01-01

    Utility regulators increasingly take responsibility for the [open quotes]extemalities[close quotes] associated with their decisions, meaning the economic and social costs related to rate decisions or other kinds of authorizations. Yet, when Congress adopted the National Environmental Policy Act of 1969 (NEPA), it intervened to ensure protection of the natural environment, not from abuses by the citizenry but from the activities of the federal government itself. Comprised of action forcing procedures, NEPA was designed to infuse the decisional processes of federal agencies with a broad awareness of the environmental consequences of their actions. NEPA encourages decisionmakers to counterbalance the organic statutory and political missions of their departments or agencies with a sensitivity to the ecological consequences of their directives and authorizations. This paper examines how the requirements of NEPA have fared in the environment of classical public utility regulation at the Federal Energy Regulatory Commission. Commission proceedings did not evidence any widely held opinion that economic regulation of the gas industry is hostile to the NEPA process.

  1. Regulatory process for decommissioning nuclear power reactors. Final report

    SciTech Connect (OSTI)

    1998-03-01

    This report provides regulatory guidance for utilities consistent with the changes in the decommissioning rule, 10 CFR50.82 as revised in July 1996. The purpose of this report is to explain the new rule in the context of related industry experience and to provide practical guidance to licensees contemplating or implementing a shutdown. Because the regulatory process is still rapidly evolving, this report reflects only a current status of the acceptable methods and practices derived from a review of the current regulations, guidance documents and industry experience for decommissioning a nuclear power reactor. EPRI anticipates periodic updates of this document to incorporate various utility experiences with decommissioning, and also to reflect any regulatory changes. The report provides a summary of ongoing federal agency and industry activities and the regulatory requirements that are currently applicable, or no longer applicable, to nuclear power plants at the time of permanent shutdown through the early decommissioning stage. The report describes the major components of a typical decommissioning action plan, providing industry experience and guidance for licensees considering or implementing permanent shutdown.

  2. Future trends and issues in regulatory takings

    SciTech Connect (OSTI)

    Allbright, M.P.

    1995-12-01

    This paper will complement that delivered by Thomas root by following his historical analysis of the Fifth Amendment through recent case law with an analysis of regulatory taking through environmental statutes. The discussion will center on takings of water rights through application of the Clean Water Act and the Threatened and Endangered Species Act. Although the examples used will be hypothetical, they will be based upon factual situations. Some of the issues presented for consideration will be an examination of standing of municipalities and corporations under the Fifth Amendment, federal and state legislation impacting the judicial trend toward reviving the Fifth Amendment, budgetary considerations, and convergence from focus on real property to other types of property. The author will also discuss the judicial trend in the Fifth Amendment cases from reliance on federal power to regulate to financial impact on real property resulting from regulation, and the potential for a return to the analysis of the power to regulate through a resurrection of the Tenth Amendment limitation of powers.

  3. Recovery Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    With the passage of the American Recovery and Reinvestment Act of 2009 (Recovery Act), the Department of Energy (Department) will have new responsibilities and receive ...

  4. American Recovery and Reinvestment Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    American Recovery and Reinvestment Act American Recovery and Reinvestment Act LANL was able to accelerate demolition and cleanup thanks to a 212 million award from the American...

  5. Legal, regulatory & institutional issues facing distributed resources development

    SciTech Connect (OSTI)

    1996-10-01

    This report describes legal, regulatory, and institutional considerations likely to shape the development and deployment of distributed resources. It is based on research co-sponsored by the National Renewable Energy Laboratory (NREL) and four investor-owned utilities (Central & South West Services, Cinergy Corp., Florida Power Corporation, and San Diego Gas & Electric Company). The research was performed between August 1995 and March 1996 by a team of four consulting firms experienced in energy and utility law, regulation, and economics. It is the survey phase of a project known as the Distributed Resources Institutional Analysis Project.

  6. Nuclear Regulatory Commission Issuances: February 1995. Volume 41, Number 2

    SciTech Connect (OSTI)

    1995-02-01

    This book contains an issuance of the Nuclear Regulatory Commission and a Director`s Decision. The issuance concerns consideration by the Commission of appeals from both the Initial Decision and a Reconsideration Order issued by the Presiding Officer involving two materials license amendment applications filed by the University of Missouri. The Director`s Decision from the Office of Enforcement denies petitions filed by Northeast Utilities employees requesting that accelerated enforcement action be taken against Northeast Utilities for activities concerned with NU`s fitness-for-duty program.

  7. S.2005: This act may be cited as the TVA Customer Protection Act of 1998, introduced in the Senate of the United States, One Hundred Fifth Congress, Second Session, April 29, 1998

    SciTech Connect (OSTI)

    1998-12-31

    This Act cited as the TVA Customer Protection Act of 1998 is to amend the Federal Power Act to ensure that certain Federal power customers are provided protection by the Federal Energy Regulatory Commission, and for other purposes. The topics of the act include disposition of property; foreign operations, protections; TVA power sales; filing and full disclosure of TVA documents; applicability of the antitrust laws; savings provision, and provision of construction equipment, contracting and engineering services.

  8. Paperwork Reductin Act Form

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PAPERWORK REDUCTION ACT COLLECTION DISCONTINUATION FORM Agency/Subagency OMB Control Number __ __ __ __ - __ __ __ __ Title of Collection: Current Expiration Date Month/Year Requested Expiration Date to Discontinue Collection Month/Year Reason for Discontinuation: Signature of Senior Official or Designee: Date: For OIRA Use ________________________ ________________________ OMB FORM 83-D, 10/04 Reset Form

  9. Paperwork Reduction Act Forms

    Office of Energy Efficiency and Renewable Energy (EERE)

    You may need to fill out one or several of these forms depending on the nature of your survey or usability project. See the Paperwork Reduction Act Web page for more information about the process. Contact the Web Usability Coordinator if you have questions about which forms to complete.

  10. American Disabilities Act

    Broader source: Energy.gov [DOE]

    The Americans with Disabilities Act prohibits private employers, state and local governments, employment agencies and labor unions from discriminating against qualified individuals with disabilities in job application procedures, hiring, firing, advancement, compensation, job training, and other terms, conditions, and privileges of employment.

  11. Clean Air Act

    Office of Energy Efficiency and Renewable Energy (EERE)

    The primary law governing the Department of Energy (DOE) air pollution control activities is the Clean Air Act (CAA). This law defines the role of the U.S. Environmental Protection Agency (EPA) and state, local and tribal air programs in protecting and improving the nation’s air quality and stratospheric ozone layer by regulating emissions from mobile and stationary sources.

  12. Nuclear Safety Regulatory Framework | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Safety Regulatory Framework Nuclear Safety Regulatory Framework February 2012 Presentation that outlines the rules, policies and orders that comprise the Department of Energy Nuclear Safety Regulatory Framework. Nuclear Safety Regulatory Framework (438.96 KB) More Documents & Publications Summary Pamphlet, Nuclear Safety at the Department of Energy CX-014643: Categorical Exclusion Determination Notice of Violation, UChicago Argonne, LLC - WEA-2009-04

  13. REGULATORY PARTNERSHIP STATEMENT | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PARTNERSHIP STATEMENT REGULATORY PARTNERSHIP STATEMENT RPS PDF.PDF (154.48 KB) More Documents & Publications REGULATORY COOPERATION COUNCIL: Annual Workplan for Energy Efficiency Standards, July 2016 REGULATORY COOPERATION COUNCIL: Annual Workplan for Energy Efficiency Standards REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT

  14. Regulatory Burden RFI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hearth & Home Technologies comments on Regulatory Burden RFI Regulatory Burden RFI (116.35 KB) More Documents & Publications Department of Energy Request for Information: Reducing Regulatory Burden (Reply Comments) Re: Regulatory Burden RFI RegReview_ReplyComments_Lennox_Hearth_Products.PDF

  15. Carrots for Utilities: Providing Financial Returns for Utility...

    Open Energy Info (EERE)

    Carrots for Utilities: Providing Financial Returns for Utility Investments in Energy Efficiency Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Carrots for Utilities:...

  16. Carbon Dioxide Utilization Summit

    Broader source: Energy.gov [DOE]

    The 6th Carbon Dioxide Utilization Summit will be held in Newark, New Jersey, from Feb. 24–26, 2016. The conference will look at the benefits and challenges of carbon dioxide utilization. Advanced Algal Systems Program Manager Alison Goss Eng and Technology Manager Devinn Lambert will be in attendance. Dr. Goss Eng will be chairing a round table on Fuels and Chemicals during the Carbon Dioxide Utilization: From R&D to Commercialization discussion session.

  17. EGA urges regulators to rethink utility structure

    SciTech Connect (OSTI)

    O'Driscoll, M.

    1994-03-04

    State and federal regulators need to rethink the existing structure of the electric power industry because the continued application of traditional processes to its emerging competitive nature is creating a conflict between market-driven generators and regulated utilities, the Electric Generation Association says. Indeed, because of the current regulatory structure, many utilities have been forced to actively resist the development of a competitive market place, the group says in a paper published for this week's National Association of Regulatory Utility Commissioners winter meetings. In place of the existing structure, the industry needs a [open quotes]new, more discerning model of regulation[close quotes] that unbundles generation from transmission and realizes that, at least during the transition, all generation facilities are at risk of being considered stranded assets. A transition policy must minimize costs overall by achieving an early and smooth resolution of the stranded investment issue. One approach looks promising: Utilities that spin off high-cost assets would be preauthorized to enter into a binding contract to buy the output of the facility for an established period at rates slightly below what the cost of power would have been, assuming continued rate base treatment of the facility. Another alternative would reflect the rate design mechanisms used in the unbundling of gas supply from transportation service: A utility calculates the differential between the book value and market value of a high-cost asset, and then converts it from a generation-related charge into a form of transition surcharge. This is added to the inelastic portion of its system rates, which most logically is the distribution charge for retail and wholesale requirements customers. The charge would be applied over a specific period of time or to a specific volume of sales.

  18. American Recovery & Reinvestment Act of 2009 (Recovery Act or ARRA) Davis-Bacon Act Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NNSA Albuquerque Service Center Labor Standards Training March 9, 2015 Eva M. Auman eva.auman@hq.doe.gov 1 Labor Standards Statutes  The Davis-Bacon Act (DBA)  Davis-Bacon and Related Acts (DBRA)  Contract Work Hours and Safety Standards Act (CWHSSA)  Copeland "Anti-Kickback" Act (CA)  Walsh-Healey Public Contracts Act (PCA)  McNamara-O'Hara Service Contract Act(SCA)  Miller Act (MA)  Fair Labor Standards Act (FLSA) 2 Labor Standards - Presidential Executive

  19. Workforce Trends in the Electric Utility Industry | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Trends in the Electric Utility Industry Workforce Trends in the Electric Utility Industry Section 1101 of the U.S. Energy Policy Act of 2005 (EPACT)1 calls for a report on the current trends in the workforce of (A) skilled technical personnel that support energy technology industries, and (B) electric power and transmission engineers. It also requests that the Secretary make recommendations (as appropriate) to meet the future labor requirements. Workforce Trends in the Electric Utility Industry

  20. Utilities | Open Energy Information

    Open Energy Info (EERE)

    historic, in human and machine readable formats. See also the NREL System Advisor Model (SAM) and NREL's BEOpt. Utility Outage Information dataset - Information and resources...

  1. Utility Service Renovations

    Broader source: Energy.gov [DOE]

    Any upgrade to utility service provides an opportunity to revisit a Federal building's electrical loads and costs, but it also may provide an economic way to bundle the upgrade with an onsite renewable electricity project during renovation. Upgrading utility service to the site may involve improving or adding a transformer, upgrading utility meters, or otherwise modifying the interconnection equipment or services with the utility. In some cases, the upgrade may change the tariff structure for the facility and may qualify the property for a different structure with lower overall costs. In all cases, the implementation of renewable energy technologies should be identified during the design phase.

  2. USET Tribal Utility Summit

    Broader source: Energy.gov [DOE]

    The United South and Eastern Tribes (USET) is hosting its annual Tribal Utility Summit at the Harrah's Cherokee Casino and hosted by Eastern Band of Cherokee Indians.

  3. Electrical Utility Materials Handler

    Broader source: Energy.gov [DOE]

    Join the Bonneville Power Administration (BPA) for a challenging and rewarding career, while working, living, and playing in the Pacific Northwest. The Electrical Utility Material Handler (EUMH)...

  4. Electric Utility Industry Update

    Broader source: Energy.gov [DOE]

    Presentation—given at the April 2012 Federal Utility Partnership Working Group (FUPWG) meeting—covers significant electric industry trends and industry priorities with federal customers.

  5. When Utility Bills Attack!

    Broader source: Energy.gov [DOE]

    As proactive as I am with my monthly budgeting, I tend to be reactive when it comes to my monthly utility bills.

  6. Utility Sounding Board

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tool Conduit Utility Sounding Board Residential Segmentation Six Going On Seven The USB was created to inform BPA on the implementation of energy efficiency programs...

  7. EM Utility Contracts

    Office of Environmental Management (EM)

    22012 EM UTILITY CONTRACT Site State Supplier Executed Contract Type DOE Contract East Tennessee Technology Park TN Tennessee Valley Authority 4272007 Energy supply contract ...

  8. Resources for Utility Regulators

    SciTech Connect (OSTI)

    SEE Action

    2012-06-01

    Provides a summary of State and Local Energy Efficiency Action Network (SEE Action) information resources available to utility regulators, organized by topic.

  9. Least-cost utility planning consumer participation manual. [Final report

    SciTech Connect (OSTI)

    Mitchell, C.; Wellinghoff, J.; Goldberg, F.

    1989-12-31

    This manual is designed to provide guidance to state consumer advocates and other state consumer groups interested in either initiating and/or participating in an Least-Cost Utility Planning (LCUP) process in their state. Least cost utility planning examined primarily as a regulatory framework to be implemented by an appropriate state authority -- usually the public utility commission -- for the benefit of the state`s citizens and electric utility customers. LCUP is also a planning process to be used by investor owned and public utilities to select, support and justify future expenditures in resource additions. This manual is designed as a ``How-To`` manual for implementing and participating in a statewide LCUP process. Its goal is to guide the reader through the LCUP maze so that meaningful, forward-looking, and cost minimizing electric utility planning can be initiated and sustained in your state.

  10. Least-cost utility planning consumer participation manual

    SciTech Connect (OSTI)

    Mitchell, C.; Wellinghoff, J.; Goldberg, F.

    1989-01-01

    This manual is designed to provide guidance to state consumer advocates and other state consumer groups interested in either initiating and/or participating in an Least-Cost Utility Planning (LCUP) process in their state. Least cost utility planning examined primarily as a regulatory framework to be implemented by an appropriate state authority -- usually the public utility commission -- for the benefit of the state's citizens and electric utility customers. LCUP is also a planning process to be used by investor owned and public utilities to select, support and justify future expenditures in resource additions. This manual is designed as a How-To'' manual for implementing and participating in a statewide LCUP process. Its goal is to guide the reader through the LCUP maze so that meaningful, forward-looking, and cost minimizing electric utility planning can be initiated and sustained in your state.

  11. Regulatory Burden RFI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulatory Burden RFI Regulatory Burden RFI These comments are submitted by the Air-Conditioning, Heating and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice appearing in the Federal Register on February 3, 2011 requesting information to assist DOE in reviewing existing regulations and in making its regulatory program more effective and less burdensome. Regulatory Burden RFI (50.14 KB) More Documents & Publications Regulatory Burden RFI from AHRI

  12. FAIR Act Inventory- FY13

    Broader source: Energy.gov [DOE]

    Federal Activities Inventory Reform (FAIR) Act - INHERENTLY GOVERNMENTAL AND COMMERCIAL ACTIVITIES (IGCA) INVENTORY

  13. Dalton Utilities | Open Energy Information

    Open Energy Info (EERE)

    Dalton Utilities Jump to: navigation, search Name: Dalton Utilities Place: Georgia Phone Number: 706-278-1313 Website: www.dutil.comresidentialinde Twitter: @DaltonUtilities...

  14. Utility+Utility Access Map | OpenEI Community

    Open Energy Info (EERE)

    utility company pages under a given utility id. From the Special Ask page, in the query box enter the following: Category:Utility CompaniesEiaUtilityId::15248 substituting...

  15. Teuchos Utility Package

    Energy Science and Technology Software Center (OSTI)

    2004-03-01

    Teuchos is designed to provide portable, object-oriented tools for Trillnos developers and users. This includes templated wrappers to BLAS/LAPACK, a serial dense matrix class, a parameter list, XML parsing utilities, reference counted pointer (smart pointer) utilities, and more. These tools are designed to run on both serial and parallel computers.

  16. Toxic Substances Control Act

    SciTech Connect (OSTI)

    Not Available

    1992-05-15

    This Reference Book contains a current copy of the Toxic Substances Control Act and those regulations that implement the statute and appear to be most relevant to DOE activities. The document is provided to DOE and contractor staff for informational purposes only and should not be interpreted as legal guidance. Questions concerning this Reference Book may be directed to Mark Petts, EH-231 (202/586-2609).

  17. History of Regulatory Oversight at LANL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to current location Advent of national environmental protection laws Clean Air Act Clean Water Act Resource Conservation and Recovery Act (RCRA) 1980s-1990s:...

  18. Recovery Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act Recovery Act Center Map PERFORMANCE The Department estimates the $6 billion Recovery Act investment will allow us to complete work now that would cost approximately $13 billion in future years, saving $7 billion. As Recovery Act work is completed through the cleanup of contaminated sites, facilities, and material disposition, these areas will becoming available for potential reuse by other entities. Recovery Act funding is helping the Department reach our cleanup goals faster.

  19. Utility Partnership Program Utility Partners | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Utility Partners Utility Partnership Program Utility Partners Utility Partnership Program utility partners are eager to work closely with federal agencies to help achieve energy management goals. If a serving utility is not listed below, utilities and agencies can contact the Federal Energy Management Program to discuss launching a utility energy service contract program. Organization Contact States Served AGL Resources Kathy Robb 404-584-4372 Florida, Georgia, Maryland, New Jersey, Virginia

  20. Utility Partnership Program Utility Partners | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Utility Partners Utility Partnership Program Utility Partners Utility Partnership Program utility partners are eager to work closely with federal agencies to help achieve energy management goals. If a serving utility is not listed below, utilities and agencies can contact the Federal Energy Management Program to discuss launching a utility energy service contract program. Organization Contact States Served AGL Resources Kathy Robb 404-584-4372 Florida, Georgia, Maryland, New Jersey, Virginia

  1. Allowance trading activity and state regulatory rulings: Evidence from the US Acid Rain Program

    SciTech Connect (OSTI)

    Bailey, E.M.

    1997-12-31

    The US Acid Rain Program is one of the first, and by far the most extensive, applications of a market based approach to pollution control. From the beginning, there has been concern whether utilities would participate in allowance trading, and whether regulatory activity at the state level would further complicate utilities` decision to trade allowances. This paper finds that public utility commission regulation has encouraged allowance trading activity in states with regulatory rulings, but that allowance trading activity has not been limited to states issuing regulations. Until there is evidence suggesting that significant additional cost savings could have been obtained if additional allowance trading activity had occurred in states without regulations or that utilities in states with regulations are still not taking advantage of all cost saving trading opportunities, this analysis suggests that there is little reason to believe that allowance trading activity is impeded by public utility commission regulations.

  2. Davis-Bacon Act Compliance Video

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Davis-Bacon Act Compliance Video

  3. General Privacy Act Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Privacy Act Guidance General Privacy Act Guidance This document provides information on Privacy Act Requests and responses to general FAQs PDF icon General Privacy Act Guidance ...

  4. Coal conversion and the Clean Air Act: help from DOE

    SciTech Connect (OSTI)

    Frank, S.A.; Spiewak, S.A.

    1982-08-19

    While a large number of fuels conversions have occurred since the 1973-1974 oil embargo, there are still many opportunities for additional conversions. Many of the conversions which have occurred to date have been under federal order because of the legal benefits which accrue to them under the Clean Air Act. The Omnibus Budget Reconciliation Act changed the thrust of the federal program from a mandatory one to a voluntary one. A number of utilities have remained in the program or elected for certification under the new regulation because of the same Clean Air Act benefits. The DOE Office of Fuels Conversion, aside from being responsible for grants of Clean Air Act exemptions, possesses certain unique resources, including capabilities for engineering, finance, fuel supply, transportation, and environmental analysis. These capabilities are available to assist utilities seeking to convert to coal in numerous ways. In addition, assistance can be and is being provided to a state public service commission. 2 figures.

  5. UESC Training for Utility Representatives

    Broader source: Energy.gov [DOE]

    Provides utility representatives with additional training to meet their responsibilities with respect to Utility Energy Savings Contracts (UESC).

  6. Assessment of net lost revenue adjustment mechanisms for utility DSM programs

    SciTech Connect (OSTI)

    Baxter, L.W.

    1995-01-01

    Utility shareholders can lose money on demand-side management (DSM) investments between rate cases. Several industry analysts argue that the revenues lost from utility DSM programs are an important financial disincentive to utility DSM investment. A key utility regulatory reform undertaken since 1989 allows utilities to recover the lost revenues incurred through successful operation of DSM programs. Explicitly defined net lost revenue adjustment (NLRA) mechanisms are states` preferred approach to lost revenue recovery from DSM programs. This report examines the experiences states and utilities are having with the NLRA approach. The report has three objectives. First, we determine whether NLRA is a feasible and successful approach to removing the lost-revenue disincentive to utility operation of DSM programs. Second, we identify the conditions linked to successful implementation of NLRA mechanisms in different states and assess whether NLRA has changed utility investment behavior. Third, we suggest improvements to NLRA mechanisms. We first identify states with NLRA mechanisms where utilities are recovering lost revenues from DSM programs. We interview staff at regulatory agencies in all these states and utility staff in four states. These interviews focus on the status of NLRA, implementation issues, DSM measurement issues, and NLRA results. We also analyze regulatory agency orders on NLRA, as well as associated testimony, reports, and utility lost revenue recovery filings. Finally, we use qualitative and quantitative indicators to assess NLRA`s effectiveness. Contrary to the concerns raised by some industry analysts, our results indicate NLRA is a feasible approach to the lost-revenue disincentive.

  7. Pursuing Energy Efficiency as a Hedge against Carbon Regulatory Risks: Current Resource Planning Practices in the West

    SciTech Connect (OSTI)

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-08-01

    Uncertainty surrounding the nature and timing of future carbon regulations poses a fundamental and far-reaching financial risk for electric utilities and their ratepayers. Long-term resource planning provides a potential framework within which utilities can assess carbon regulatory risk and evaluate options for mitigating exposure to this risk through investments in energy efficiency and other low-carbon resources. In this paper, we examine current resource planning practices related to managing carbon regulatory risk, based on a comparative analysis of the most-recent long-term resource plans filed by fifteen major utilities in the Western U.S. First, we compare the assumptions and methods used by utilities to assess carbon regulatory risk and to evaluate energy efficiency as a risk mitigation option. Although most utilities have made important strides in beginning to address carbon regulatory risk within their resource plan, we also identify a number of opportunities for improvement and offer recommendations for resource planners and state regulators to consider. We also summarize the composition and carbon intensity of the preferred resource portfolios selected by the fifteen Western utilities, highlighting the contribution of energy efficiency and its impact on the carbon intensity of utilities' proposed resource strategies. Energy efficiency and renewables are the dominant low-carbon resources included in utilities' preferred portfolios. Across the fifteen utilities, energy efficiency constitutes anywhere from 6percent to almost 50percent of the preferred portfolio energy resources, and represents 22percent of all incremental resources in aggregate.

  8. Pursuing Energy Efficiency as a Hedge against Carbon Regulatory Risks: Current Resource Planning Practices in the West

    SciTech Connect (OSTI)

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-07-11

    Uncertainty surrounding the nature and timing of future carbon regulations poses a fundamental and far-reaching financial risk for electric utilities and their ratepayers. Long-term resource planning provides a potential framework within which utilities can assess carbon regulatory risk and evaluate options for mitigating exposure to this risk through investments in energy efficiency and other low-carbon resources. In this paper, we examine current resource planning practices related to managing carbon regulatory risk, based on a comparative analysis of the most-recent long-term resource plans filed by fifteen major utilities in the Western U.S. First, we compare the assumptions and methods used by utilities to assess carbon regulatory risk and to evaluate energy efficiency as a risk mitigation option. Although most utilities have made important strides in beginning to address carbon regulatory risk within their resource plan, we also identify a number of opportunities for improvement and offer recommendations for resource planners and state regulators to consider. We also summarize the composition and carbon intensity of the preferred resource portfolios selected by the fifteen Western utilities, highlighting the contribution of energy efficiency and its impact on the carbon intensity of utilities' proposed resource strategies. Energy efficiency and renewables are the dominant low-carbon resources included in utilities' preferred portfolios. Across the fifteen utilities, energy efficiency constitutes anywhere from 6percent to almost 50percent of the preferred portfolio energy resources, and represents 22percent of all incremental resources in aggregate.

  9. WIPP - Privacy Act of 1974

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Privacy Act Quick Links Affidavit For Surviving Relative Request for Report of Radiation Exposure History 5 U.S.C. § 552a 10 CFR 1008 Privacy Act of 1974 TABLE OF CONTENTS HOW TO MAKE A PRIVACY ACT REQUEST WITH THE U. S. DEPARTMENT OF ENERGY CARLSBAD FIELD OFFICE PRIVACY ACT OVERVIEW DISCLOSURE OF PERSONAL INFORMATION VIOLATIONS EXEMPTIONS FEES AND TIME LIMITS LINKS TO OTHER INTERESTING SITES HOW TO MAKE A PRIVACY ACT REQUEST WITH THE U. S. DEPARTMENT OF ENERGY CARLSBAD FIELD OFFICE Privacy Act

  10. AWWA Utility Management Conference

    Broader source: Energy.gov [DOE]

    Hosted by the American Water Works Association (AWWA), the Utility Management Conference is one of the leading management conferences to share experiences and learn from others in similar situations to the most pressing management issues of the day.

  11. PAM stack test utility

    Energy Science and Technology Software Center (OSTI)

    2007-08-22

    The pamtest utility calls the normal PAM hooks using a service and username supplied on the command line. This allows an administratory to test any one of many configured PAM stacks as any existing user on the machine.

  12. Utility Metering- AGL Resources

    Broader source: Energy.gov [DOE]

    Presentation—given at the Spring 2013 Federal Utility Partnership Working Group (FUPWG) meeting—discusses AGL Resources metering, including interruptible rate customers, large users, and meeting federal metering goals.

  13. Hualapai Tribal Utility Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hualapai Tribal Utility Project Tribal Utility Project DOE First Steps Program DOE First Steps Program Jack Ehrhardt Jack Ehrhardt - - Hualapai Planning Director Hualapai Planning Director WHO WE ARE WHO WE ARE ~1 MILLION ACRES IN ~1 MILLION ACRES IN NW ARIZONA NW ARIZONA 108 MILES OF THE 108 MILES OF THE GRAND CANYON GRAND CANYON 2500 Members 2500 Members Peach Springs Peach Springs Community Community ~240 electric customers ~240 electric customers ECONOMIC SITUATION ECONOMIC SITUATION Very

  14. Implementing a program of cooperative federalism: The Surface Mining Control and Reclamation Act of 1977

    SciTech Connect (OSTI)

    Miller, R.

    1989-01-01

    This article outlines the legislative history of the Surface Mining Control and Reclamation Act of 1977 and describes the forces that promoted a federalist arrangement of shared powers and responsibility for implementing the environmental reclamation provisions of the Act. The major components of the Act are reviewed and the Act is examined in terms of its general effectiveness in promoting reclamation as well as its contribution to the practice of American federalism and the capacity of state government to implement complex regulatory programs. The article concludes that SMCRA has had a positive impact in terms of improving state capabilities, expanding public involvement in decision making, and enhancing federal and state cooperation.

  15. New York Recovery Act Snapshot

    Broader source: Energy.gov [DOE]

    The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in New York are supporting a...

  16. Energy By The Numbers: Recovery Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act Energy By The Numbers: Recovery Act Addthis America is now a world leader in clean energy. But how did we get there? One key reason is the Recovery Act of 2009, a historic investment to revitalize the economy during the worst financial crisis since the Great Depression. This investment created millions of jobs -- including thousands of clean energy jobs in sectors that never even existed before. For example, in 2009 there was not a single utility-scale photovoltaic solar farm in the

  17. Public Utility Commission in the year 2000

    SciTech Connect (OSTI)

    Jones, D.N.

    1995-12-31

    This article is about What is and What ought to be as we look to the institution of public utility commission regulation at the turn of the century. To signal my own view at the outset, I find the prospects somewhat worrisome in light of the nature and direction of much of the response to real and imaginary changes in the regulated sectors. I surely do not call for standing in place, but I strongly believe we should leave the place standing. The following items are discernable trends that will shape the PUC at the turn-of-the century: (1) dichotomy of customers into core and noncore groups, (2) unbundling and new service offerings with a menu of prices, (3) relaxed regulation and increased reliance on market solutions instead of command and control, (4) increased use of market-based pricing and incentive ratemaking, (5) large users seeking lowest-cost generation and supply services, (6) shift from old regulatory bargains regarding exclusive territorial franchises and assured recovery of costs and investments, (7) utility diversification, (8) increasing business risk for utilities, amd (9) uncertainty as to continued utility attention to social goals and a changing obligation to serve. For each of these, the author focuses on: (1) changing missions and roles of the PUC, (2) the strategies for achieving them, and (3) the implementation requirements that operationalize the strategies.

  18. Recovery Act State Memos Tennessee

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act State Memos Tennessee For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  19. Recovery Act State Memos Alabama

    Broader source: Energy.gov (indexed) [DOE]

    Updated July 2010 | Department of Energy Chart listing projects selected for Smart Grid Investment Grants under American Recovery and Reinvestment Act. There is a November 2011 Update to the "Recovery Act Selections for Smart Grid Investment Grant Awards - By Category" file. Recovery Act Selections for Smart Grid Invesment Grant Awards- By Category (461.59 KB) More Documents & Publications FINAL Combined SGIG Selections - By Category for Press -AOv10.xls Recovery Act Selections

  20. American Recovery and Reinvestment Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    American Recovery and Reinvestment Act American Recovery and Reinvestment Act LANL was able to accelerate demolition and cleanup thanks to a $212 million award from the American Recovery and Reinvestment Act. August 1, 2013 Excavation trench and enclosure at TA-21. To protect air quality, MDA B is excavated under a dome. By September 2011, all projects were complete. In 2010 and 2011, LANL received $212 million in funding from the American Recovery and Reinvestment Act to complete three

  1. The Privacy Act of 1974

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Privacy Act of 1974 The Privacy Act of 1974, 5 U.S.C. §552a, governs an agency's collection, storage, and use of information about an individual. The Privacy Act protects the privacy of individuals by establishing fair information practices for the collection, maintenance, use, and dissemination of information by federal agencies. Frequently Asked Questions Who is an individual for the purposes of the Privacy Act? A (living) citizen of the United States or an alien lawfully admitted for

  2. Recovery Act State Memos Illinois

    Broader source: Energy.gov (indexed) [DOE]

    ......... 13 RECOVERY ACT SUCCESS STORIES - ENERGY EMPOWERS * Retooled machines bring new green jobs to Illinois ......15 * County partners ...

  3. Tribal Renewable Energy Webinar: Project Regulatory Considerations...

    Office of Environmental Management (EM)

    Regulatory Considerations Tribal Renewable Energy Webinar: Project Regulatory Considerations August 31, 2016 11:00AM to 12:30PM MDT Learn about the many permitting and project ...

  4. 5.0 INTERFACE OF REGULATORY AUTHORITIES

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5-1 5.0 INTERFACE OF REGULATORY AUTHORITIES 5.1 REGULATORY PROGRAMS The RCRA, CERCLA, and State Dangerous Waste Program overlap in many areas. In general, CERCLA was created by...

  5. Renee Forney (Acting) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renee Forney (Acting) About Us Renee Forney (Acting) - Deputy CIO for Cybersecurity

  6. Supporting documentation and control over Economic Regulatory Administration cases

    SciTech Connect (OSTI)

    Not Available

    1985-11-19

    This report discusses the adequacy of the Economic Regulatory Administration's (ERA) documentation of and control over cases involving alleged petroleum pricing violations. In response to the oil embargo and price increase, Congress passed the Emergency Petroleum Allocation Act of 1973 (15 USC 751). The Government assured compliance by investigating petroleum pricing violations, recovering overcharges, and making restitution to injured parties. Between August 1973 and January 1981, when oil prices were decontrolled, ERA and predecessor federal agencies established and enforced regulations controlling the allocation and pricing of crude oil and refined petroleum products.

  7. FPCC Regulatory Barriers Submittal | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FPCC Regulatory Barriers Submittal FPCC Regulatory Barriers Submittal The Federal Performance Contracting Coalition (FPCC) appreciates the opportunity to comment on reducing regulatory burdens on the Federal government, specifically as they pertain to federal energy actions. FPCC_Reg_Barriers_Submittal.pdf (53.27 KB) More Documents & Publications NAESCO Comments on Reducing Regulatory Burden RFI Final Practical Guide to Savings and Payments in FEMP ESPC Task Orders How Energy Savings

  8. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1990-08-15

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  9. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1990-04-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  10. Nuclear Regulatory Commission 1989 Information Digest

    SciTech Connect (OSTI)

    None,

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  11. Portsmouth Regulatory Approach | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulatory Approach Portsmouth Regulatory Approach The regulatory framework for the Decontamination & Decommissioning program requires five major decisions with public input, as outlined in the Director’s Final Findings and Orders. The regulatory framework for the Decontamination & Decommissioning program requires five major decisions with public input, as outlined in the Director's Final Findings and Orders. Environmental Remediation Environmental remediation, or the cleanup of

  12. Community energy systems and the law of public utilities

    SciTech Connect (OSTI)

    Feurer, D.A.; Weaver, C.L.

    1981-01-01

    A detailed description is given of the laws and programs of the State of Nebraska governing the regulation of public energy utilities, the siting of energy generating and transmission facilities, the municipal franchising of public energy utilities, and the prescription of rates to be charged by utilities including attendant problems of cost allocations, rate base and operating expense determinations, and rate of return allowances. These laws and programs are analyzed to identify impediments which they may present to the implementation of Integrated Community Energy Systems (ICES). This report is one of fifty-one separate volumes which describe such regulatory programs at the Federal level and in each state as background to the report entitiled ''Community Energy Systems and the Law of Public Utilities--Volume One: An Overview.'' This report also contains a summary of a strategy described in Volume One - An Overview for overcoming these impediments by working within the existing regulatory framework and by making changes in the regulatory programs to enhance the likelihood of ICES implementation.

  13. Triple acting radial seal

    SciTech Connect (OSTI)

    Ebert, Todd A; Carella, John A

    2012-03-13

    A triple acting radial seal used as an interstage seal assembly in a gas turbine engine, where the seal assembly includes an interstage seal support extending from a stationary inner shroud of a vane ring, the interstage seal support includes a larger annular radial inward facing groove in which an outer annular floating seal assembly is secured for radial displacement, and the outer annular floating seal assembly includes a smaller annular radial inward facing groove in which an inner annular floating seal assembly is secured also for radial displacement. A compliant seal is secured to the inner annular floating seal assembly. The outer annular floating seal assembly encapsulates the inner annular floating seal assembly which is made from a very low alpha material in order to reduce thermal stress.

  14. Geothermal Regulatory Roadmap | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulatory Roadmap Geothermal Regulatory Roadmap Geothermal Regulatory Roadmap presentation at the April 2013 peer review meeting held in Denver, Colorado. grr_peer2013.pdf (1.04 MB) More Documents & Publications track 1: systems analysis | geothermal 2015 peer review Geothermal Technologies Program Annual Peer Review Presentation By Doug Hollett Validation of Innovation Exploration Technologies for Newberry Volcano

  15. Improving Regulation and Regulatory Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alton Strategic Environmental Group New Port Richey, FL charles.alton@earthlink.net April 4, 2011 Daniel Cohen, Assistant General Counsel Legislation, Regulation, and Energy Efficiency Office of the General Counsel U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Dear Mr. Cohen: I have reviewed the Request For Information regarding Reducing Regulatory Reform issued February 3, 2011 (Federal Register /Vol. 76, No. 23 /Thursday, February 3, 2011 /Notices). In the

  16. Attorney-Adviser (Public Utilities)

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commissions Division of Investigations, within the Office of Enforcement, is responsible for the enforcement of the Commissions statutes, orders, and rules governing...

  17. Making a Privacy Act Request - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Making a Privacy Act Request Freedom of Information and Privacy Act DOE Headquarters FOIA Web Page A Citizen's Guide to the FOIA and Privacy Act Making a Privacy Act Request Freedom of Information Act, 5 U.S.C. Freedom of Information Act Regulations Privacy Act Regulations DOE Public Reading Room PNNL Technical Library Electronic FOIA Reading Room Freedom of Information Act & Privacy Act Contacts Records Previously Disclosed Helpful Links FOIA Home Making a Privacy Act Request Email Email

  18. Documentation and control over economic regulatory adminstration field cases

    SciTech Connect (OSTI)

    Not Available

    1988-08-01

    This review was performed to evaluate the Economic Regulatory Administrations's (ERA) documentation of and control over cases involving alleged petroleum pricing violations. In response to the oil embargo and price increase, the Congress passed the Emergency Petroleum Allocation Act of 1973 (Act). The Government assured compliance by investigating petroleum pricing violations, recovering overcharges, and making restitution to injured parties. Between August 1973 and January 1981, ERA and predecessor Federal agencies established and enforced regulations controlling the allocation and pricing of crude oil and refined petroleum products. The purpose of this review was to determine whether adequate internal controls were in place to assure that overcharge cases were being resolved in accordance with established guidelines. Specific objectives were to determine whether ERA's internal controls assured that (1) the bases for resolving cases were documented, (2) case settlements were approved by more than one person, and (3) cases were tracked until all overcharge issues were resolved.

  19. Fed`s new regulatory role in emerging power markets

    SciTech Connect (OSTI)

    Moler, E.A.

    1997-10-01

    Efforts to deregulate the electric utility industry are not exactly operating at the frontier of reform. The natural gas industry has scouted out the territory, and the same regulatory agency that oversaw that transition will be establishing a few boundaries for the electric utility industry as well. The agency in charge is the Federal Energy Regulatory Commission (FERC), says Elizabeth A. Moler, chair of the FERC in Washington, D.C. The electric power industry, she adds, already is responding positively to the new competitive environment. For example, {open_quotes}state regulators are taking advantage of the opportunities afforded by FERC`s new regulations to provide choice to customers at the retail level,{close_quotes} Moler says. However, potential abuses on the new open market include price fixing and other unfair practices. {open_quotes}A utility that controls all of the generation within a large geographic area may yet control prices. Regulators at the federal and state levels must guard against these problems,{close_quotes} Moler says. In the new world of deregulation, old anti-trust laws may be invoked to ensure that monopolies do not unfarily limit competition.

  20. S. 2415: Title I may be cited as the Uranium Enrichment Act of 1990; Title II may be cited as the Uranium Security and Tailings Reclamation Act of 1989; and Title III may be cited as The Solar, Wind, Waste, and Geothermal Power Production Incentives Act of 1990, introduced in the Senate, One Hundred First Congress, Second Session, April 4, 1990

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    S. 2415 (which started out as a bill to encourage solar and geothermal power generation) now would amend the Atomic Energy Act of 1954 to redirect uranium enrichment enterprises to further the national interest, respond to competitive market forces, and to ensure the nation's common defense and security. It would establish a United States Enrichment Corporation for the following purposes: to acquire feed materials, enriched uranium, and enrichment facilities; to operate these facilities; to market enriched uranium for governmental purposes and qualified domestic and foreign persons; to conduct research into uranium enrichment; and to operate as a profitable, self-financing, reliable corporation and in a manner consistent with the health and safety of the public. The bill describes powers and duties of the corporation; the organization, finance, and management; decontamination and decommissioning. The second part of the bill would ensure an adequate supply of domestic uranium for defense and power production; provide assistance to the domestic uranium industry; and establish, facilitate, and expedite a comprehensive system for financing reclamation and remedial action at active uranium and thorium processing sites. The third part of the bill would remove the size limitations on power production facilities now part of the Public Utility Regulatory Policies Act of 1978. Solar, wind, waste, or geothermal power facilities would no longer have to be less than 80 MW to qualify as a small power production facility.

  1. Faces of the Recovery Act: The Impact of Smart Grid

    SciTech Connect (OSTI)

    President Obama

    2009-11-24

    On October 27th, Baltimore Gas & Electric was selected to receive $200 million for Smart Grid innovation projects under the Recovery Act. Watch as members of their team, along with President Obama, explain how building a smarter grid will help consumers cut their utility bills, battle climate change and create jobs.

  2. Faces of the Recovery Act: The Impact of Smart Grid

    ScienceCinema (OSTI)

    President Obama

    2010-09-01

    On October 27th, Baltimore Gas & Electric was selected to receive $200 million for Smart Grid innovation projects under the Recovery Act. Watch as members of their team, along with President Obama, explain how building a smarter grid will help consumers cut their utility bills, battle climate change and create jobs.

  3. Flora Utilities | Open Energy Information

    Open Energy Info (EERE)

    Flora Utilities Jump to: navigation, search Name: Flora Utilities Place: Indiana Phone Number: 574-967-4971 Website: www.townofflora.orgflora-util Outage Hotline: 574-967-4971...

  4. Double acting bit holder

    DOE Patents [OSTI]

    Morrell, Roger J.; Larson, David A.; Ruzzi, Peter L.

    1994-01-01

    A double acting bit holder that permits bits held in it to be resharpened during cutting action to increase energy efficiency by reducing the amount of small chips produced. The holder consist of: a stationary base portion capable of being fixed to a cutter head of an excavation machine and having an integral extension therefrom with a bore hole therethrough to accommodate a pin shaft; a movable portion coextensive with the base having a pin shaft integrally extending therefrom that is insertable in the bore hole of the base member to permit the moveable portion to rotate about the axis of the pin shaft; a recess in the movable portion of the holder to accommodate a shank of a bit; and a biased spring disposed in adjoining openings in the base and moveable portions of the holder to permit the moveable portion to pivot around the pin shaft during cutting action of a bit fixed in a turret to allow front, mid and back positions of the bit during cutting to lessen creation of small chip amounts and resharpen the bit during excavation use.

  5. Utility FGD Survey, January--December 1989. Volume 2, Design performance data for operating FGD systems, Part 1

    SciTech Connect (OSTI)

    Hance, S.L.; McKibben, R.S.; Jones, F.M.

    1992-03-01

    The Utility flue gas desulfurization (FGD) Survey report, which is generated by a computerized data base management system, represents a survey of operational and planned domestic utility flue gas desulfurization (FGD) systems. It summarizes information contributed by the utility industry, system and equipment suppliers, system designers, research organizations, and regulatory agencies. The data cover system design, fuel characteristics, operating history, and actual system performance. Also included is a unit-by-unit discussion of problems and solutions associated with the boilers, scrubbers, and FGD systems. The development status (operational, under construction, or in the planning stages), system supplier, process, waste disposal practice, and regulatory class are tabulated alphabetically by utility company.

  6. DOE Offers Technical Assistance on EPA Rules Implementation to States and the Utility Industry

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) is offering technical assistance to state public utility commissioners, generation owner/operators, and utilities on implementing the new and pending EPA air rules affecting the electric utility industry. Examples of typical assistance include technical information on cost and performance of the various power plant pollution retrofit control technologies; technical information on generation, demand-side or transmission alternatives for any replacement power needed for retiring generating units; and assistance to public utility commissions regarding any regulatory evaluations or approvals they may have to make on utility compliance strategies.

  7. Pueblo de San Ildefonso | Department of Energy

    Office of Environmental Management (EM)

    Energy Policy Act of 2005 (EPACT 2005) - List of Covered Electric Utilities. | Department of Energy Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the Energy Policy Act of 2005 (EPACT 2005) - List of Covered Electric Utilities. Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the Energy Policy Act of 2005 (EPACT 2005) - List of Covered Electric Utilities. Under Title I of the Public Utility Regulatory Policies Act of 1978 (PURPA), the U.S.

  8. UESC Training for Utility Representatives

    Broader source: Energy.gov [DOE]

    Webinar covers utility energy service contracts (UESC), which allow utilities to provide their Federal agencies with comprehensive energy and water efficiency improvements and demand-reduction services.

  9. Industrial Energy Efficiency Utility Webinars

    Office of Energy Efficiency and Renewable Energy (EERE)

    State, regional, and utility partners can learn how to help manufacturing customers save energy by reading the following presentations. Webinars feature experts from utilities, government, and...

  10. UESCs Training for Utility Representatives

    Broader source: Energy.gov [DOE]

    This webinar covers utility energy service contracts (UESC), which allow utilities to provide their Federal agencies with comprehensive energy and water efficiency improvements and demand-reduction services.

  11. GSA-Utility Interconnection Agreements

    Broader source: Energy.gov [DOE]

    Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—covers the General Service Administration's (GSA's) utility interconnection agreements.

  12. Cannelton Utilities | Open Energy Information

    Open Energy Info (EERE)

    Cannelton Utilities Jump to: navigation, search Name: Cannelton Utilities Place: Indiana Phone Number: (812) 547-7919 Outage Hotline: (812) 547-7919 References: EIA Form EIA-861...

  13. Hustisford Utilities | Open Energy Information

    Open Energy Info (EERE)

    Hustisford Utilities Jump to: navigation, search Name: Hustisford Utilities Place: Wisconsin Phone Number: (920) 349-3650 Website: www.hustisford.comindex.asp?S Outage Hotline:...

  14. Maryville Utilities | Open Energy Information

    Open Energy Info (EERE)

    Maryville Utilities Jump to: navigation, search Name: Maryville Utilities Place: Tennessee Phone Number: 865.273.3900 or 865-273-3300 Website: www.maryvillegov.comutility-p...

  15. Slinger Utilities | Open Energy Information

    Open Energy Info (EERE)

    Slinger Utilities Jump to: navigation, search Name: Slinger Utilities Place: Wisconsin Phone Number: (262)644-5265 Website: www.vi.slinger.wi.govindex.as Outage Hotline: (262)...

  16. Breakthrough Industrial Carbon Capture, Utilization and Storage Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Begins Full-Scale Operations | Department of Energy Industrial Carbon Capture, Utilization and Storage Project Begins Full-Scale Operations Breakthrough Industrial Carbon Capture, Utilization and Storage Project Begins Full-Scale Operations May 10, 2013 - 11:36am Addthis NEWS MEDIA CONTACT (202) 586-4940 WASHINGTON - The Energy Department's Acting Assistant Secretary for Fossil Energy Christopher Smith today attended a dedication ceremony at the Air Products and Chemicals hydrogen production

  17. UNITED STATES NUCLEAR REGULATORY COMMISSION

    Office of Legacy Management (LM)

    WASHINGTON, 0. C. 20555 AUG i 3 1979 ,,~---Y--*. FCAF:Wi3 )I 70-364 : i: SNM-414,jAmendment No. 3 --A Babcock and Wilcox Company Nuclear Materials Division ATTN: Mr. Michael A. Austin Manager, Technical Control 609 North Warren Avenue Apollo, Pennsylvania 15613 Gentiemen: (1 i' \ (. \ In accordance with your application dated June 18, 1979, and pursuant to Title 10, Code of Federal Regulations, Part 70, Materials License SNM-414 is hereby amended to: 1. Delete the function of the Regulatory

  18. Nuclear Regulatory Commission's antitrust review process: an analysis of the impacts

    SciTech Connect (OSTI)

    Not Available

    1981-06-01

    The Nuclear Regulatory Commission's (NRC) antitrust process is reviewed and its impacts to small systems and applicant systems are studied. This process takes the form of a description of the NRC's antitrust review process as implemented, a generic categorization of potential impacts and individual case-by-case studies of four different utilities.

  19. Managing an evolution: Deregulation of the electric utility industry

    SciTech Connect (OSTI)

    Skinner, S.K.

    1994-12-31

    The author discusses the emerging competitive situation in the electric power industry as deregulation of electric utilities looms on the horizon. The paper supports this change, and the competition it will bring, but urges caution as changes are instituted, and the regulatory bodies decide how and how much to free, and at what rates. The reason for his urge for caution comes from historical experience of other industries, which were smaller and had less direct impact on every American.

  20. Utility Community Solar Handbook- Understanding and Supporting Utility Program Development

    Broader source: Energy.gov [DOE]

    The "Utility Community Solar Handbook: Understanding and Supporting Utility Program Development" provides the utility's perspective on community solar program development and is a resource for government officials, regulators, community organizers, solar energy advocates, non-profits, and interested citizens who want to support their local utilities in implementing projects.

  1. Recovery Act State Memos Alaska

    Broader source: Energy.gov (indexed) [DOE]

    Alaska For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  2. Recovery Act State Memos Arizona

    Broader source: Energy.gov (indexed) [DOE]

    Arizona For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  3. Recovery Act State Memos Arkansas

    Broader source: Energy.gov (indexed) [DOE]

    Arkansas For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  4. Recovery Act State Memos California

    Broader source: Energy.gov (indexed) [DOE]

    California For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  5. Recovery Act State Memos Colorado

    Broader source: Energy.gov (indexed) [DOE]

    Colorado For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  6. Recovery Act State Memos Connecticut

    Broader source: Energy.gov (indexed) [DOE]

    Connecticut For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  7. Recovery Act State Memos Delaware

    Broader source: Energy.gov (indexed) [DOE]

    Delaware For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  8. Recovery Act State Memos Florida

    Broader source: Energy.gov (indexed) [DOE]

    Florida For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  9. Recovery Act State Memos Georgia

    Broader source: Energy.gov (indexed) [DOE]

    Georgia For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  10. Recovery Act State Memos Guam

    Broader source: Energy.gov (indexed) [DOE]

    Guam For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  11. Recovery Act State Memos Hawaii

    Broader source: Energy.gov (indexed) [DOE]

    Hawaii For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  12. Recovery Act State Memos Idaho

    Broader source: Energy.gov (indexed) [DOE]

    Idaho For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  13. Recovery Act State Memos Indiana

    Broader source: Energy.gov (indexed) [DOE]

    Indiana For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  14. Recovery Act State Memos Iowa

    Broader source: Energy.gov (indexed) [DOE]

    Iowa For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  15. Recovery Act State Memos Kansas

    Broader source: Energy.gov (indexed) [DOE]

    Kansas For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  16. Recovery Act State Memos Kentucky

    Broader source: Energy.gov (indexed) [DOE]

    Kentucky For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  17. Recovery Act State Memos Louisiana

    Broader source: Energy.gov (indexed) [DOE]

    Louisiana For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  18. Recovery Act State Memos Maine

    Broader source: Energy.gov (indexed) [DOE]

    Maine For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  19. Recovery Act State Memos Maryland

    Broader source: Energy.gov (indexed) [DOE]

    Maryland For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  20. Recovery Act State Memos Massachusetts

    Broader source: Energy.gov (indexed) [DOE]

    Massachusetts For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  1. Recovery Act State Memos Michigan

    Broader source: Energy.gov (indexed) [DOE]

    Michigan For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  2. Recovery Act State Memos Minnesota

    Broader source: Energy.gov (indexed) [DOE]

    Minnesota For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  3. Recovery Act State Memos Mississippi

    Broader source: Energy.gov (indexed) [DOE]

    Mississippi For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  4. Recovery Act State Memos Montana

    Broader source: Energy.gov (indexed) [DOE]

    Montana For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  5. Recovery Act State Memos Nebraska

    Broader source: Energy.gov (indexed) [DOE]

    Nebraska For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  6. Recovery Act State Memos Ohio

    Broader source: Energy.gov (indexed) [DOE]

    Ohio For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  7. Recovery Act State Memos Oklahoma

    Broader source: Energy.gov (indexed) [DOE]

    Oklahoma For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  8. Recovery Act State Memos Oregon

    Broader source: Energy.gov (indexed) [DOE]

    Oregon For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  9. Recovery Act State Memos Texas

    Broader source: Energy.gov (indexed) [DOE]

    Tennessee For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  10. Recovery Act State Memos Utah

    Broader source: Energy.gov (indexed) [DOE]

    Utah For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  11. Recovery Act State Memos Vermont

    Broader source: Energy.gov (indexed) [DOE]

    Vermont For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  12. Recovery Act State Memos Virginia

    Broader source: Energy.gov (indexed) [DOE]

    Virginia For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  13. Recovery Act State Memos Washington

    Broader source: Energy.gov (indexed) [DOE]

    Washington For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  14. Recovery Act State Memos Wyoming

    Broader source: Energy.gov (indexed) [DOE]

    Wyoming For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  15. PAPERWORK REDUCTION ACT OF 1995

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PAPERWORK REDUCTION ACT OF 1995 U. S. DEPARTMENT OF ENERGY INFORMATION COLLECTION MANAGEMENT PROGRAM Chris Rouleau, PRA Officer Records Management Division Office of the Associate Chief Information Officer for IT Planning, Architecture and E-Government Office of the Chief Information Officer Office of the Chief Information Officer 2/16/2010 2 TOPICS  Paperwork Reduction Act (PRA) of 1995 - Law  Paperwork Reduction Act - Overview  Information Collection Requests (ICRs)  Information

  16. Recovery Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Financial Opportunities » Past Opportunities » Recovery Act Recovery Act Pie chart diagram shows the breakdown of how cost-sharing funds relatedto the American Recovery and Reinvestment Act from industry participants,totaling $54 million (for a grand total of $96 million), are allocatedwithin the Fuel Cell Technologies Office, updated September 2010. Thediagram shows that $18.5 million is allocated to backup power, $9.7million is allocated to lift truck, $7.6 million is allocated to

  17. Michael R. Maraya (Acting) | Department of Energy

    Office of Environmental Management (EM)

    R. Maraya (Acting) About Us Michael R. Maraya (Acting) - Deputy CIO for Enterprise Policy, Portfolio Management & Governance Mike Maraya is the Acting Deputy CIO for Enterprise...

  18. Public comment sought on final end state of Experimental Breeder Reactor-II

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Public Utility Regulatory Policies Act of 1978 (PURPA) Public Utility Regulatory Policies Act of 1978 (PURPA) "List of Covered Electric Utilities" under the Public Utility Regulatory Policies Act of 1978 (PURPA) The Energy Policy Act of 2005 (EPACT 2005) Subtitle E contains three sections (secs. 1251, 1252, and 1254) that add additional "States-must-consider" standards to the Public Utility Regulatory Policies Act of 1978 (PURPA). Specifically, EPACT 2005 adds five

  19. Request for Privacy Act Records

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Outreach Doing Business Expand Doing Business Skip navigation links Newsroom About Us Civil Rights - EEO Freedom of Information Act Investor Relations Library Privacy Request for...

  20. Clean Air Act, Section 309

    Energy Savers [EERE]

    CLEAN AIR ACT 309* 7609. Policy review (a) The Administrator shall review and comment in writing on the environmental impact of any matter relating to duties and ...

  1. Freedom of Information Act Response

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for information that you made to the Bonneville Power Administration (BPA) under the Freedom of Information Act (FOIA), 5 USC 552. You requested the following: Copies of all...

  2. Real ID Act in brief

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Real Estate Approvals Real Estate Approvals Real Estate Approvals Policy Flash 2011-61, Acquisition Guide Chapter 17.3, Acquisition, Use, and Disposal of Real Estate (attachment)

    Visitors » Badging, Badge Office » Real ID Act in brief Real ID Act in brief Effective Nov. 3, 2014, the Lab will implement requirements of the REAL ID Act. Contact Badge Office (505) 667-6901 Email REAL ID Act in brief REAL ID is a coordinated effort by the states and the Federal Government to improve the

  3. Williamson Act | Open Energy Information

    Open Energy Info (EERE)

    Abstract Williamson Act, Cal. Gov. Code 51200-51297.4, current through June 23, 2014. Published NA Year Signed or Took Effect 1965 Legal Citation Cal. Gov. Code ...

  4. Recovery Act | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    to increase our supply of clean, renewable energy. July 11, 2013 Demand Response: Lessons Learned with an Eye to the Future Under the Recovery Act, the Energy Department...

  5. Recovery Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RECIPIENTS Smart Grid Investment Grant 3,482,831,000 99 ... Transmission Planning 80,000,000 6 State Assistance for Recovery Act Related Electricity Policies ...

  6. Recovery Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EV Everywhere: Electric Vehicle Benefits Recovery Act Plug-in electric vehicles (also known as electric cars or EVs) are connected, fun, and practical. They can reduce emissions, ...

  7. MTV Utility Library

    Energy Science and Technology Software Center (OSTI)

    2008-02-29

    The MSV Java Utility Library contains software developed over many years for many sponsors. (This work is not a derivative of CB-EMIS), but rather support to the CB-EMIS software). Projects that have used and contributed to code in this library: CB-EMIS (PROTECT), BWIC, Fort Future, Teva, Integrated Oceans, ENKIMDU, RCW, JEMS, JWACS, EPA watershed, and many others. This library will continue to be used in other non-CB-EMIS related projects. The components include: Spatial components: Multi-coordinatemore » system spatial objects. 2D spatial indexing system, and polygon griding system. Data translation: Allows import and export of file based data to and from object oriented systems. Multi-platform data streams: Allows platform specific data streams to operate on any support platform. Other items include printing, custom GUI components, support for NIMA Raster Product Format, program logging utilities and others.« less

  8. Power Towers for Utilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Towers for Utilities - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced Nuclear

  9. Innovative Regulatory and Technical Approaches for the U.S. Army Corp of Engineers' Linde FUSRAP Site Remediation

    SciTech Connect (OSTI)

    Pitts, J. T.; Coutts, P. W.; Franz, J.; Boyle, J. D.; Rogers, B. C.

    2002-02-27

    The U.S. Department of Energy (USDOE) created the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 1974 to identify, investigate, and cleanup or control radiological contamination at sites used by the Manhattan Engineer District (MED) and the Atomic Energy Commission (AEC) from the 1940s through the 1960s. The USDOE had identified 46 sites in the program and finished remediation at 24 of the smaller ones before the end of 1997. With the passage of the Energy and Water Resources Appropriation Act of 1998 the United States Army Corps of Engineers (USACE) was designated by Congress with responsibility to manage and execute the FUSRAP. The Linde Site located in Tonawanda, New York was operated by the MED from 1942-1946 to extract uranium from several high-grade ores. This natural uranium was subsequently enriched in U-235 elsewhere in the United States and ultimately used to produce energy or weapons. Though in the process of reviewing alternative disposal options by 1995, the USDOE had operated FUSRAP with a strategy requiring virtually all materials remediated be disposed of at only one Nuclear Regulatory Commission licensed facility. The change in management of the FUSRAP in 1997 allowed the disposal policy of low levels of radioactively contaminated materials found at the remaining sites to be reexamined. This paper presents some of the innovative regulatory and technical approaches employed at the Linde Site that are resulting in project cost savings while meeting applicable or relevant and appropriate requirements as well as fulfilling commitments made to the local community.

  10. STEP Utility Bill Analysis Report

    Broader source: Energy.gov [DOE]

    STEP Utility Bill Analysis Report, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  11. STEP Utility Data Release Form

    Broader source: Energy.gov [DOE]

    STEP Utility Data Release Form, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  12. Evaluation in a competitive utility environment: the threat of confidentiality

    SciTech Connect (OSTI)

    Vine, Edward

    1997-06-01

    Utilities have become concerned that their competitors will desire access to energy-related data--including energy-efficiency data collected by utilities from their energy- efficiency programs--that they may regard as proprietary or confidential. In the future, disputes about confidentiality may focus more on costs and market information (as well as energy use and load data) than on energy-efficiency data per se. So far, the discussion has been limited to ratepayer-funded data. Consequently, many utilities are now requesting that the data (including evaluation data) they submit to their utility regulatory commissions remain confidential. Withholding utility information from the public is likely to harm the evaluation community that depends on the free flow of information for improving the practice of evaluation as well as for disseminating the lessons learned from particular program evaluations. Confidentiality will also have significant policy implications. In response to these concerns, in late 1995 and early 1996, we conducted a survey of state public utility commissions (PUCs) in the U.S. to assess: (1) the relative importance of the issue of confidential data in the regulatory arena; (2) the regulatory response to utility requests for confidentiality (e.g., formal policies, guidelines, rules and procedures, and decisions); and (3) the type of data filed as confidential with PUCS. We focus on the first two objectives of this study. In addition to our interviews, we reviewed selected state statutes, judicial and PUC decisions, rules and procedures, protective orders, and interim policy documents. Evaluators need to understand the context of confidentiality as well as the response of the regulatory commissions to confidentiality, because evaluators will need to adapt to a new environment where energy-related data and information may be harder to obtain and distribute. We propose that regulators conduct the following activities as soon as possible: 1. Assess

  13. TRUPACT-II, a regulatory perspective

    SciTech Connect (OSTI)

    Gregory, P.C.; Spooner, O.R.

    1995-12-31

    The Transuranic Package Transporter II (TRUPACT-II) is a US Nuclear Regulatory Commission (NRC) certified Type B packaging for the shipment of contact-handled transuranic (CH-TRU) material by the US Department of Energy (DOE). The NRC approved the TRUPACT-II design as meeting the requirements of Title 10, Code of Federal Regulations, Part 71 (10 CFR 71) and issued Certificate of Compliance (CofC) Number 9218 to the DOE. There are currently 15 certified TRUPACT-IIs. Additional TRUPACT-IIs will be required to make more than 15,000 shipments of CH-TRU waste to the Waste Isolation Pilot Plant (WIPP) site near Carlsbad, New Mexico. The TRUPACT-II may also be used for the DOE inter-site and intra-site shipments of CH-TRU waste. The Land Withdrawal Act (Public Law 102-579), enacted by the US Congress, October 30, 1992, and an agreement between the DOE and the State of New Mexico, signed August 4, 1987, both stipulate that only NRC approved packaging may be used for shipments of TRU waste to the WIPP. Early in the TRUPACT-II development phase it was decided that the transportation system (tractor, trailer, and TRUPACT-II) should be highway legal on all routes without the need for oversize and/or overweight permits. In large measure, public acceptance of the DOE`s efforts to safely transport CH-TRU waste depends on the public`s perception that the TRUPACT-II is in compliance with all applicable regulations, standards, and quality assurance requirements. This paper addresses some of the numerous regulations applicable to Type B packaging, and it describes how the TRUPACT-II complies with these regulations.

  14. Nuclear Waste Policy Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Waste Policy Act Nuclear Waste Policy Act Document on the Nuclear Waste Policy Act of 1982 An Act to provide for the development of repositories for the disposal of ...

  15. Biomass Program Recovery Act Factsheet

    SciTech Connect (OSTI)

    2010-03-01

    The Biomass Program has awarded about $718 million in American Recovery and Reinvestment Act (Recovery Act) funds. The projects the Program is supporting are intended to: Accelerate advanced biofuels research, development, and demonstration; Speed the deployment and commercialization of advanced biofuels and bioproducts; Further the U.S. bioindustry through market transformation and creating or saving a range of jobs.

  16. Environmental Regulatory Update Table, November 1991

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-12-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  17. Environmental Regulatory Update Table, October 1990

    SciTech Connect (OSTI)

    Houlberg, L.M.; Noghrei-Nikbakht, P.A.; Salk, M.S.

    1990-11-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  18. Environmental Regulatory Update Table, December 1991

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1992-01-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  19. Environmental Regulatory Update Table, October 1991

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-11-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  20. Environmental Regulatory Update Table, September 1991

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-10-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  1. Environmental Regulatory Update Table, August 1991

    SciTech Connect (OSTI)

    Houlberg, L.M., Hawkins, G.T.; Salk, M.S.

    1991-09-01

    This Environmental Regulatory Update Table (August 1991) provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  2. Environmental regulatory update table, July 1991

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-08-01

    This Environmental Regulatory Update Table (July 1991) provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  3. Regulatory Considerations for Developing Distributed Generation Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Webinar | Department of Energy Distributed Generation Projects Webinar Regulatory Considerations for Developing Distributed Generation Projects Webinar Presentation slides for the Regulatory Considerations for Developing Distributed Generation Projects webinar, which was held on May 23, 2012. Download the webinar slides. (1.84 MB) More Documents & Publications Regulatory Considerations for Developing Generation Projects on Federal Lands STUDY OF THE EFFECT OF PRIVATE WIRE LAWS ON

  4. EIA - Natural Gas Pipeline Network - Regulatory Authorities

    U.S. Energy Information Administration (EIA) Indexed Site

    Regulatory Authorities About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates U.S. Natural Gas Regulatory Authorities Beginning | Regulations Today | Coordinating Agencies | Regulation of Mergers and Acquisitions Beginning of Industry Restructuring In April 1992, the Federal Energy Regulatory Commission (FERC) issued its Order 636 and transformed the interstate natural gas transportation segment of the industry forever. Under it,

  5. Environmental Regulatory Update Table, December 1989

    SciTech Connect (OSTI)

    Houlbert, L.M.; Langston, M.E. ); Nikbakht, A.; Salk, M.S. )

    1990-01-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  6. Environmental regulatory update table, March 1989

    SciTech Connect (OSTI)

    Houlberg, L.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1989-04-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  7. Environmental Regulatory Update Table, April 1989

    SciTech Connect (OSTI)

    Houlberg, L.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1989-05-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  8. Funding Opportunity Announcement: Recovery Act ? Energy Efficiency...

    Office of Environmental Management (EM)

    Funding Opportunity Announcement: Recovery Act Energy Efficiency and Conversation Block Grants Formula Grants Funding Opportunity Announcement: Recovery Act Energy...

  9. Restrospective Regulatory Review | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    On January 18, 2011, President Obama issued Executive Order 13563, Improving Regulation and Regulatory Review, which directs federal agencies, among other things, to review ...

  10. Nuclear Regulatory Commission's Integrated Strategy for Spent...

    Office of Environmental Management (EM)

    Growing Spent Fuel Inventory Cumulative Used Nuclear Fuel Scenarios 50,000 100,000 150,000 ... of a regulatory framework for reprocessing - Reviewing YM application ...

  11. REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT: Natural...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    COUNCIL - WORK PLANNING FORMAT: Natural Gas Use in Transportation PDF icon RCC Workplan NGV.PDF More Documents & Publications REGULATORY COOPERATION COUNCIL - WORK PLANNING ...

  12. Federal / State Legislative & Regulatory Changes Required for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ethanol blends Federal State Legislative & Regulatory Changes Required for Introduction of E15 (2.81 MB) More Documents & Publications Vehicle Certification Test Fuel and Ethanol ...

  13. Reducing Regulatory Burden - EO 13563 Retrospective Review |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan for Retrospective Analysis of Existing Rules Regulatory and Financial Reform of Federal Research Policy: Recommendations to the NRC Committee on Research Universities

  14. Fuel Use Act: implications for new power generation. [Conference paper

    SciTech Connect (OSTI)

    Schneider, H.S.; Jandegian, G.V.

    1980-01-01

    The electric utility industry has, in general, supported the national goal of an energy shift away from imported oil to coal and other fuels but has felt that the Power Plant and Industrial Fuel Use Act is redundant and largely irrelevant. The industy believes power plant conversions to coal and new base-load plants shifting to coal has been occurring for the past several years as a result of: (1) the rapidly escalating costs associated with foreign oil imports; (2) the Federal Energy Office request for voluntary conversion to coal during the 1973-1974 oil embargo; and (3) the Energy supply and Environmental Coordination Act of 1974 prohibition and construction orders. DOE's position that, without the Fuel Use Act, utilities can continue business as usual, cannot be supported in light of the extraordinary volatile market and reliability aspects of continued use of oil. What the Act has failed to acknowledge is the need for a more-flexible and balanced approach that recognizes the experience, needs, and concerns in distinct regions of the country. What must be examined are the problem areas faced by the industry in forcing coal use in certain regions where there are increasingly stringent environmental and economic concerns to be considered or where there has been historically heavy dependence on oil as a primary energy source. The next five years will be a period of learning for both (ERA) and the electric utility industry, a period that will mold our energy future through the year 2000. 7 references.

  15. Tribal Utility Feasibility Study

    SciTech Connect (OSTI)

    Engel, R. A.; Zoellick, J. J.

    2007-06-30

    The Schatz Energy Research Center (SERC) assisted the Yurok Tribe in investigating the feasibility of creating a permanent energy services program for the Tribe. The original purpose of the DOE grant that funded this project was to determine the feasibility of creating a full-blown Yurok Tribal electric utility to buy and sell electric power and own and maintain all electric power infrastructure on the Reservation. The original project consultant found this opportunity to be infeasible for the Tribe. When SERC took over as project consultant, we took a different approach. We explored opportunities for the Tribe to develop its own renewable energy resources for use on the Reservation and/or off-Reservation sales as a means of generating revenue for the Tribe. We also looked at ways the Tribe can provide energy services to its members and how to fund such efforts. We identified opportunities for the development of renewable energy resources and energy services on the Yurok Reservation that fall into five basic categories: • Demand-side management – This refers to efforts to reduce energy use through energy efficiency and conservation measures. • Off-grid, facility and household scale renewable energy systems – These systems can provide electricity to individual homes and Tribal facilities in areas of the Reservation that do not currently have access to the electric utility grid. • Village scale, micro-grid renewable energy systems - These are larger scale systems that can provide electricity to interconnected groups of homes and Tribal facilities in areas of the Reservation that do not have access to the conventional electric grid. This will require the development of miniature electric grids to serve these interconnected facilities. • Medium to large scale renewable energy development for sale to the grid – In areas where viable renewable energy resources exist and there is access to the conventional electric utility grid, these resources can be

  16. Tribal Utility Policy Issues

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Utility Policy Issues New Mexico July 27, 2015 Margaret Schaff Kanim Associates, LLC (An Indian Owned Consulting Firm) 303-443-0182 mschaff@att.net *US Energy Information Administration New Mexico Energy Stats  Sixth in crude oil production in the nation in 2013.  5% of U.S. marketed natural gas production in 2012  Largest coal-fired electric power plants in NM both on Navajo Nation  2,100-megawatt Four Corners (Navajo Mine) (APS)  1,643-megawatt San Juan (San Juan Mines) (Public

  17. Regulatory Oversight Program, July 1, 1993--March 3, 1997. Volume 1

    SciTech Connect (OSTI)

    1997-09-01

    On July 1, 1993, a Regulatory Oversight (RO) organization was established within the United States Department of Energy (DOE), Oak Ridge Operations (ORO) to provide regulatory oversight of the DOE uranium enrichment facilities leased to the United States Enrichment Corporation (USEC). The purpose of the RO program was to ensure continued plant safety, safeguards and security while the Paducah and Portsmouth gaseous diffusion plants (GDPs) transitioned to regulatory oversight by the Nuclear Regulatory Commission (NRC). These activities were performed under the authority of the lease agreement between DOE and USEC until NRC issued a Certificate of Compliance or approved a Compliance Plan pursuant to Section 1701 of the Atomic Energy Act of 1954, as amended, and assumed regulatory responsibility. This report chronicles the formal development, operation and key activities of the RO organization from its beginning in July 1993, until the turnover of the regulatory oversight responsibility to the NRC on March 3, 1997. Through its evolution to closure, the RO program was a formal, proceduralized effort designed to provide consistent regulation and to facilitate transition to NRC. The RO Program was also a first-of-a-kind program for DOE. The process, experience, and lessons learned summarized herein should be useful as a model for transition of other DOE facilities to privatization or external regulation.

  18. Regulatory Policy and Markets for Energy Storage in North America

    SciTech Connect (OSTI)

    Kintner-Meyer, Michael CW

    2014-05-14

    The last 5 years have been one of the most exciting times for the energy storage industry. We have seen significant advancements in the regulatory process to make accommodations for valuing and monetizing energy storage for what it provides to the grid. The most impactful regulatory decision for the energy storage industry has come from California, where the California Public Utilities Commission issued a decision that mandates procurement requirements of 1.325 GW for energy storage to 3 investor-own utilities in 4 stages: in 2014, 2016, 2018, and 2020. Furthermore, at the Federal level, FERCs Order 755, requires the transmission operators to develop pay for performance tariffs for ancillary services. This has had direct impact on the market design of US competitive wholesale markets and the monetization of fast responding grid assets. While this order is technology neutral, it clearly plays into the fast-responding capability of energy storage technologies. Today PJM, CAISO, MISO, NYISO, and NE-ISO have implemented Order 755 and offer new tariff for regulation services based on pay-for-performance principles. Furthermore, FERC Order 784, issued in July 2013 requires transmission providers to consider speed and accuracy in determining the requirements for ancillary services. In November 2013, FERC issued Order 972, which revises the small generator interconnection agreement which declares energy storage as a power source. This order puts energy storage on par with existing generators. This paper will discuss the implementation of FERCs Pay for Performance Regulation order at all ISOs in the U.S. under FERC regulatory authority (this excludes ERCOT). Also discussed will be the market impacts and overall impacts on the NERC regulation performance indexes. The paper will end with a discussion on the California and Ontario, Canada procurement mandates and the opportunity that it may present to the energy storage industry.

  19. Recovery Act | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    learned from utilities' consumer engagement efforts as part of the Smart Grid Investment Grant Program. These lessons offer practical steps that can reduce risks and...

  20. Regulatory Considerations Associated with the Expanded Adoption of Distributed Solar

    SciTech Connect (OSTI)

    Bird, L.; McLaren, J.; Heeter, J.; Linvill, C.; Shenot, J.; Sedano, R.; Migden-Ostrander, J.

    2013-11-01

    Increased adoption of distributed PV, and other forms of distributed generation, have the potential to affect utility-customer interactions, system costs recovery, and utility revenue streams. If a greater number of electricity customers choose to self-generate, demand for system power will decrease and utility fixed costs will have to be recovered over fewer kilowatt hours of sales. As such, regulators will need to determine the value and cost of additional distributed PV and determine the appropriate allocation of the costs and benefits among consumers. The potential for new business models to emerge also has implications for regulation and rate structures that ensure equitable solutions for all electricity grid users. This report examines regulatory tools and rate designs for addressing emerging issues with the expanded adoption of distributed PV and evaluates the potential effectiveness and viability of these options going forward. It offers the groundwork needed in order for regulators to explore mechanisms and ensure that utilities can collect sufficient revenues to provide reliable electric service, cover fixed costs, and balance cost equity among ratepayers -- while creating a value proposition for customers to adopt distributed PV.

  1. Utility Static Generation Reliability

    Energy Science and Technology Software Center (OSTI)

    1993-03-05

    PICES (Probabilistic Investigation of Capacity and Energy Shortages) was developed for estimating an electric utility''s expected frequency and duration of capacity deficiencies on a daily on and off-peak basis. In addition to the system loss-of-load probability (LOLP) and loss-of-load expectation (LOLE) indices, PICES calculates the expected frequency and duration of system capacity deficiencies and the probability, expectation, and expected frequency and duration of a range of system reserve margin states. Results are aggregated and printedmore » on a weekly, monthly, or annual basis. The program employs hourly load data and either the two-state (on/off) or a more sophisticated three-state (on/partially on/fully off) generating unit representation. Unit maintenance schedules are determined on a weekly, levelized reserve margin basis. In addition to the 8760-hour annual load record, the user provides the following information for each unit: plant capacity, annual maintenance requirement, two or three-state unit failure and repair rates, and for three-state models, the partial state capacity deficiency. PICES can also supply default failure and repair rate values, based on the Edison Electric Institute''s 1979 Report on Equipment Availability for the Ten-Year Period 1968 Through 1977, for many common plant types. Multi-year analysis can be performed by specifying as input data the annual peak load growth rates and plant addition and retirement schedules for each year in the study.« less

  2. A primer on incentive regulation for electric utilities

    SciTech Connect (OSTI)

    Hill, L.J.

    1995-10-01

    In contemplating a regulatory approach, the challenge for regulators is to develop a model that provides incentives for utilities to engage in socially desirable behavior. In this primer, we provide guidance on this process by discussing (1) various models of economic regulation, (2) problems implementing these models, and (3) the types of incentives that various models of regulation provide electric utilities. We address five regulatory models in depth. They include cost-of-service regulation in which prudently incurred costs are reflected dollar-for-dollar in rates and four performance-based models: (1) price-cap regulation, in which ceilings are placed on the average price that a utility can charge its customers; (2) revenue-cap regulation, in which a ceiling is placed on revenues; (3) rate-of-return bandwidth regulation, in which a utility`s rates are adjusted if earnings fall outside a {open_quotes}band{close_quotes} around equity returns; and (4) targeted incentives, in which a utility is given incentives to improve specific components of its operations. The primary difference between cost-of-service and performance-based approaches is the latter sever the tie between costs and prices. A sixth, {open_quotes}mixed approach{close_quotes} combines two or more of the five basic ones. In the recent past, a common mixed approach has been to combine targeted incentives with cost-of-service regulation. A common example is utilities that are subject to cost-of-service regulation are given added incentives to increase the efficiency of troubled electric-generating units.

  3. Freedom of Information Act (FOIA) and Privacy Act Requests |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    penalty in the Privacy Act for requesting or obtaining access to records under false pretenses, and 2) include a declaration that your statement is true and correct under penalty ...

  4. Utilization Technology Institute | Open Energy Information

    Open Energy Info (EERE)

    Utilization Technology Institute Jump to: navigation, search Name: Utilization Technology Institute Place: Des Plaines, IL References: Utilization Technology Institute1...

  5. Utility Energy Service Contracts Training for Utility Representatives

    Office of Energy Efficiency and Renewable Energy (EERE)

    This webinar targets Federal staff, as well as utility representatives, and provides an understanding of the legal parameters, contracting requirements, financing options, and other aspects of utility energy service contracts (UESC).

  6. Federal Utility Partnership Working Group- Utility Interconnection Panel

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—discusses solar/photovoltaic (PV) projects to connect with utility in California and their issues.

  7. Perspectives on the future of the electric utility industry

    SciTech Connect (OSTI)

    Tonn, B.; Schaffhauser, A.

    1994-04-01

    This report offers perspectives on the future of the electric utility industry. These perspectives will be used in further research to assess the prospects for Integrated Resource Planning (IRP). The perspectives are developed first by examining economic, political and regulatory, societal, technological, and environmental trends that are (1) national and global in scope and (2) directly related to the electric utility industry. Major national and global trends include increasing global economic competition, increasing political and ethnic strife, rapidly changing technologies, and increasing worldwide concern about the environment. Major trends in the utility industry include increasing competition in generation; changing patterns of electricity demand; increasing use of information technology to control power systems; and increasing implementation of environmental controls. Ways in which the national and global trends may directly affect the utility industry are also explored. The trends are used to construct three global and national scenarios- ``business as usual,`` ``technotopia future,`` and ``fortress state`` -and three electric utility scenarios- ``frozen in headlights,`` ``megaelectric,`` and ``discomania.`` The scenarios are designed to be thought provoking descriptions of potential futures, not predictions of the future, although three key variables are identified that will have significant impacts on which future evolves-global climate change, utility technologies, and competition. While emphasis needs to be placed on understanding the electric utility scenarios, the interactions between the two sets of scenarios is also of interest.

  8. Assessment & Commitment Tracking System (ACTS)

    Energy Science and Technology Software Center (OSTI)

    2004-12-20

    The ACTS computer code provides a centralized tool for planning and scheduling assessments, tracking and managing actions associated with assessments or that result from an event or condition, and "mining" data for reporting and analyzing information for improving performance. The ACTS application is designed to work with the MS SQL database management system. All database interfaces are written in SQL. The following software is used to develop and support the ACTS application: Cold Fusion HTMLmoreJavaScript Quest TOAD Microsoft Visual Source Safe (VSS) HTML Mailer for sending email Microsoft SQL Microsoft Internet Information Serverless

  9. Assessment & Commitment Tracking System (ACTS)

    Energy Science and Technology Software Center (OSTI)

    2004-12-20

    The ACTS computer code provides a centralized tool for planning and scheduling assessments, tracking and managing actions associated with assessments or that result from an event or condition, and "mining" data for reporting and analyzing information for improving performance. The ACTS application is designed to work with the MS SQL database management system. All database interfaces are written in SQL. The following software is used to develop and support the ACTS application: Cold Fusion HTMLmore » JavaScript Quest TOAD Microsoft Visual Source Safe (VSS) HTML Mailer for sending email Microsoft SQL Microsoft Internet Information Server« less

  10. Assessment & Commitment Tracking System (ACTS)

    SciTech Connect (OSTI)

    Bryant, Robert A.; Childs, Teresa A.; Miller, Michael A.; Sellars, Kevin J.

    2004-12-20

    The ACTS computer code provides a centralized tool for planning and scheduling assessments, tracking and managing actions associated with assessments or that result from an event or condition, and "mining" data for reporting and analyzing information for improving performance. The ACTS application is designed to work with the MS SQL database management system. All database interfaces are written in SQL. The following software is used to develop and support the ACTS application: Cold Fusion HTML JavaScript Quest TOAD Microsoft Visual Source Safe (VSS) HTML Mailer for sending email Microsoft SQL Microsoft Internet Information Server

  11. DOE Recovery Act Field Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act Field Projects DOE Recovery Act Field Projects DOE Recovery Act Field Projects

  12. EM Utility Contracts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Utility Contracts EM Utility Contracts Table providing summary information of EM awards for utility services. PDF icon EM Utility Contracts More Documents & Publications Land and ...

  13. utility rate | OpenEI Community

    Open Energy Info (EERE)

    utility Utility Companies utility rate Utility Rates version 1 version 2 version 3 web service Smart meter After several months of development and testing, the next...

  14. Utility Partnership Webinar Series: State Mandates for Utility Energy Efficiency

    Broader source: Energy.gov [DOE]

    This webinar highlights state mandates from throughout the country, and how they’ve influenced utility industrial energy efficiency programs.

  15. A municipal guide to least cost utility planning

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    The recent track record of ``traditional`` electricity planning, which entails selection of supply side resources to meet forecasted demand, has not been good. There are numerous examples of utilities incorrectly forecasting demand and over-building generating capacity while others underestimated growth and have had to cut demand and find alternate power sources to avoid outages. A potential solution to this problem is the continuing development of Least Cost Utility Plannning (LCUP). Regulatory commissions, consumer advocates and utilities are increasingly relying an LCUP as the most responsible way to avoid construction of new capacity and alleviate anticipated shortages caused by cancellation of construction projects, load growth, or natural replacement of aging capacity. The purpose of this report is to provide municipalities a starting point for evaluating their servicing utilities or states` least cost plan. This was accomplished by: Identifying key issues in LCUP; reviewing examples of the collaborative and classic approaches to LCUP in Illinois, California, New York State and Michigan; cataloging municipal authorities and strategies which can influence or support LCUP activities. Results of the project indicate that through a basic understanding of LCUP processes and issues, municipalities will be in a better position to influence plans or, if necessary, intervene in regulatory proceedings where plans are adopted. Constraints to municipal involvement in LCUP include statutory limitations, resource constraints, and a lack of knowledge of indirect authorities that support the LCUP process.

  16. A municipal guide to least cost utility planning

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    The recent track record of traditional'' electricity planning, which entails selection of supply side resources to meet forecasted demand, has not been good. There are numerous examples of utilities incorrectly forecasting demand and over-building generating capacity while others underestimated growth and have had to cut demand and find alternate power sources to avoid outages. A potential solution to this problem is the continuing development of Least Cost Utility Plannning (LCUP). Regulatory commissions, consumer advocates and utilities are increasingly relying an LCUP as the most responsible way to avoid construction of new capacity and alleviate anticipated shortages caused by cancellation of construction projects, load growth, or natural replacement of aging capacity. The purpose of this report is to provide municipalities a starting point for evaluating their servicing utilities or states' least cost plan. This was accomplished by: Identifying key issues in LCUP; reviewing examples of the collaborative and classic approaches to LCUP in Illinois, California, New York State and Michigan; cataloging municipal authorities and strategies which can influence or support LCUP activities. Results of the project indicate that through a basic understanding of LCUP processes and issues, municipalities will be in a better position to influence plans or, if necessary, intervene in regulatory proceedings where plans are adopted. Constraints to municipal involvement in LCUP include statutory limitations, resource constraints, and a lack of knowledge of indirect authorities that support the LCUP process.

  17. DSM and electric utility competitiveness: An Illinois perspective

    SciTech Connect (OSTI)

    Jackson, P.W.

    1994-12-31

    A predominant theme in the current electric utility industry literature is that competitive forces have emerged and may become more prominent. The wholesale bulk power market is alreadly competitive, as non-utility energy service providers already have had a significant impact on that market; this trend was accelerated by the Energy Policy Act of 1992. Although competition at the retail level is much less pervasive, electric utility customers increasingly have greater choice in selecting energy services. These choices may include, depending on the customer, the ability to self-generate, switch fuels, move to a new location, or rely more heavily on demand-side management as a means of controlling electric energy use. This paper explores the subject of how demand-side management (DSM) programs, which are often developed by a utility to satisfy resource requirements as a part of its least-cost planning process, can affect the utility`s ability to compete in the energy services marketplace. In this context, the term `DSM` is used in this paper to refer to those demand-side services and programs which provide resources to the utility`s system. Depending on one`s perspective, DSM programs (so defined) can be viewed either as an enhancement to the competitive position of a utility by enabling it to provide its customers with a broader menu of energy services, simultaneously satisfying the objectives of the utility as well as those of the customers, or as a detractor to a utility`s ability to compete. In the latter case, the concern is with respect to the potential for adverse rate impacts on customers who are not participants in DSM programs. The paper consists of an identification of the pros and cons of DSM as a competitive strategy, the tradeoff which can occur between the cost impacts and rate impacts of DSM, and an examination of alternative strategies for maximizing the utilization of DSM both as a resource and as a competitive strategy.

  18. Electric utilities sales and revenue monthly report (EIA-826), 1987. Data file

    SciTech Connect (OSTI)

    Curry, J.; Wilkins, S.

    1987-01-01

    The purpose of Form EI-826 formerly FERC-5, Electric Utility Company Monthly Statement, is to collect data necessary to fulfill regulatory responsibility; identify near-term trends in energy use; and contingency analysis. The form is filed monthly by approximately 150 electric utilities. All privately owned electric utilities with annual electric operating revenues of $100,000,000 or more must respond. In addition, the sample includes other selected electric utilities. The reported data is expanded by factors, calculated using annual data from a previous period, to give electric sales data by state and sector. Other information collected includes data gathered on depreciation, construction, net income before taxes, and extraordinary items.

  19. Electric Utilities Monthly Sales and Revenue Report (EIA-826), current. Data file

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    Form EI-826, formerly FERC-5, Electric Utility Company Monthly Statement, collects data necessary to fulfill regulatory responsibility; identify near-term trends in energy use; and contingency analysis. The form is filed monthly by approximately 150 electric utilities. All privately owned electric utilities with annual electric operating revenues of $100,000,000 or more must respond. In addition, the sample includes other selected electric utilities. The reported data is expanded by factors, calculated using annual data from a previous period, to give electric sales data by state and sector. Other information collected includes data gathered on depreciation, construction, net income before taxes, and extraordinary items.

  20. Antitrust implications of utility participation in the market for remote photovoltaic systems

    SciTech Connect (OSTI)

    Starrs, T.J.

    1994-12-31

    Remote photovoltaic systems are an important niche market in the development of a viable photovoltaics industry. Electric utilities in the US have started offering remote photovoltaic service. Utilities have the potential to use their monopoly power in regulated markets to unfair competitive advantage in competitive markets. Therefore, utility participation in remote photovoltaic markets raises potentially significant issues of antitrust law and policy. This paper describes some of the legal and factual criteria that US courts and regulatory agencies are likely to use in assessing the antitrust implications of utility participation in the market for remote photovoltaic systems.

  1. Monitoring EERE's Recovery Act Portfolio

    SciTech Connect (OSTI)

    2011-01-01

    Performance monitoring of Recovery Act projects within EERE has been an ongoing effort. Project recipients have been reporting technical and financial progress to project officers on a quarterly basis.

  2. Freedom of Information Act Request

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Privacy Act must be signed and, therefore, cannot be submitted on this form. Name Richard van Dijk Email Orga nizati AnotherWayBPA on Maim g Addre ss City RECEIVED BY BPA...

  3. Recovery Act Funding Opportunities Webcast

    Broader source: Energy.gov [DOE]

    As a result of the 2009 American Reinvestment and Recovery Act, the Geothermal Technologies Office (GTO) has four open Funding Opportunity Announcements (FOAs) totaling $484 million for cost-shared...

  4. Freedom of Information Act Request

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10:11 AM Submitted by Anonymous User This message was created by a Microsoft InfoPath form. The form data may be included as an attachment. Freedom of Information Act (FOIA)...

  5. Juana Del Pilar Silverio (Acting)

    Broader source: Energy.gov [DOE]

    Ms. Juana Del Pilar Silverio, Esq. is currently detailed to the Department of Energy’s Office of the Chief Information Officer as Acting Deputy Chief of Staff. Ms. Silverio joined the...

  6. Utility Connection | Open Energy Information

    Open Energy Info (EERE)

    your utility company, then provide us a little information about yourself. Only one person from each utility can answer these questions and the results from your input will be...

  7. Mandatory Utility Green Power Option

    Broader source: Energy.gov [DOE]

    Beginning January 1, 2002, each electric utility must inform its customers on a quarterly basis of the voluntary option to purchase green power. The details of each utility's program must be...

  8. LANL exceeds Early Recovery Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exceeds Early Recovery Act recycling goals March 8, 2010 More than 136 tons of metal saved from demolished buildings LOS ALAMOS, New Mexico, March 9, 2009-Los Alamos National Laboratory announced today that Lab demolition projects under the American Recovery and Reinvestment Act have recovered more than 136 tons of recyclable metal since work began last year, largely due to the skill of heavy equipment operators and efforts to gut the buildings before they come down. Some 106 tons of metal came

  9. REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy COOPERATION COUNCIL - WORK PLANNING FORMAT REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT RCC Workplan PDF EN FR.PDF (67.81 KB) More Documents & Publications REGULATORY COOPERATION COUNCIL: Annual Workplan for Energy Efficiency Standards, July 2016 REGULATORY COOPERATION COUNCIL: Annual Workplan for Energy Efficiency Standards REGULATORY PARTNERSHIP STATEMENT

  10. A Survey of Utility Experience with Real Time Pricing

    SciTech Connect (OSTI)

    Barbose, Galen; Goldman, Charles; Neenan, Bernie

    2004-12-01

    While more than 70 utilities in the U.S. have offered voluntary RTP tariffs on either a pilot or permanent basis, most have operated in relative obscurity. To bring this broad base of experience to bear on policymakers current efforts to stimulate price responsive demand, we conducted a survey of 43 voluntary RTP tariffs offered in 2003. The survey involved telephone interviews with RTP program managers and other utility staff, as well as a review of regulatory documents, tariff sheets, program evaluations, and other publicly available sources. Based on this review of RTP program experience, we identify key trends related to: utilities motivations for implementing RTP, evolution of RTP tariff design, program participation, participant price response, and program outlook. We draw from these findings to discuss implications for policymakers that are currently considering voluntary RTP as a strategy for developing price responsive demand.

  11. Proceedings of the alcohol fuel production and utilization conference

    SciTech Connect (OSTI)

    Not Available

    1980-01-01

    A conference was held to provide farmers, businesses, industries, and specialty groups with the best available information on current and projected activities related to the production and utilization of biomass for alcohol fuels. All aspects of the alcohol fuel production and utilization process were discussed. From biomass sources, through conversion processes to end-use products and applications were topics discussed by numerous experts. Other experts took this basic information and put it together into total systems. Speakers presented overviews on alcohol fuel related activities on state, regional, and national levels. Finally, commercialization incentives, funding sources, environmental considerations, research developments, safety considerations, and regulatory requirements were discussed as factors which must be addressed when considering the production and utilization of alcohol fuels. Separate abstracts have been prepared for items within the scope of the Energy Data Base.

  12. Factors that affect electric-utility stranded commitments

    SciTech Connect (OSTI)

    Hirst, E.; Hadley, S.; Baxter, L.

    1996-07-01

    Estimates of stranded commitments for U.S. investor-owned utilities range widely, with many falling in the range of $100 to $200 billion. These potential losses exist because some utility-owned power plants, long-term power-purchase contracts and fuel-supply contracts, regulatory assets, and expenses for public-policy programs have book values that exceed their expected market values under full competition. This report quantifies the sensitivity of stranded- commitment estimates to the various factors that lead to these above- market-value estimates. The purpose of these sensitivity analyses is to improve understanding on the part of state and federal regulators, utilities, customers, and other electric-industry participants about the relative importance of the factors that affect stranded- commitment amounts.

  13. On the Path to SunShot. Utility Regulatory and Business Model...

    Office of Scientific and Technical Information (OSTI)

    ... Research Org: National Renewable Energy Lab. (NREL), Golden, CO (United States) Sponsoring Org: USDOE Office of Energy Efficiency and Renewable Energy (EERE), Solar Energy ...

  14. YEAR 2 BIOMASS UTILIZATION

    SciTech Connect (OSTI)

    Christopher J. Zygarlicke

    2004-11-01

    This Energy & Environmental Research Center (EERC) Year 2 Biomass Utilization Final Technical Report summarizes multiple projects in biopower or bioenergy, transportation biofuels, and bioproducts. A prototype of a novel advanced power system, termed the high-temperature air furnace (HITAF), was tested for performance while converting biomass and coal blends to energy. Three biomass fuels--wood residue or hog fuel, corn stover, and switchgrass--and Wyoming subbituminous coal were acquired for combustion tests in the 3-million-Btu/hr system. Blend levels were 20% biomass--80% coal on a heat basis. Hog fuel was prepared for the upcoming combustion test by air-drying and processing through a hammer mill and screen. A K-Tron biomass feeder capable of operating in both gravimetric and volumetric modes was selected as the HITAF feed system. Two oxide dispersion-strengthened (ODS) alloys that would be used in the HITAF high-temperature heat exchanger were tested for slag corrosion rates. An alumina layer formed on one particular alloy, which was more corrosion-resistant than a chromia layer that formed on the other alloy. Research activities were completed in the development of an atmospheric pressure, fluidized-bed pyrolysis-type system called the controlled spontaneous reactor (CSR), which is used to process and condition biomass. Tree trimmings were physically and chemically altered by the CSR process, resulting in a fuel that was very suitable for feeding into a coal combustion or gasification system with little or no feed system modifications required. Experimental procedures were successful for producing hydrogen from biomass using the bacteria Thermotoga, a deep-ocean thermal vent organism. Analytical procedures for hydrogen were evaluated, a gas chromatography (GC) method was derived for measuring hydrogen yields, and adaptation culturing and protocols for mutagenesis were initiated to better develop strains that can use biomass cellulose. Fly ash derived from

  15. Technical support document: Energy conservation standards for consumer products: Dishwashers, clothes washers, and clothes dryers including: Environmental impacts; regulatory impact analysis

    SciTech Connect (OSTI)

    Not Available

    1990-12-01

    The Energy Policy and Conservation Act as amended (P.L. 94-163), establishes energy conservation standards for 12 of the 13 types of consumer products specifically covered by the Act. The legislation requires the Department of Energy (DOE) to consider new or amended standards for these and other types of products at specified times. This Technical Support Document presents the methodology, data and results from the analysis of the energy and economic impacts of standards on dishwashers, clothes washers, and clothes dryers. The economic impact analysis is performed in five major areas: An Engineering Analysis, which establishes technical feasibility and product attributes including costs of design options to improve appliance efficiency. A Consumer Analysis at two levels: national aggregate impacts, and impacts on individuals. The national aggregate impacts include forecasts of appliance sales, efficiencies, energy use, and consumer expenditures. The individual impacts are analyzed by Life-Cycle Cost (LCC), Payback Periods, and Cost of Conserved Energy (CCE), which evaluate the savings in operating expenses relative to increases in purchase price; A Manufacturer Analysis, which provides an estimate of manufacturers' response to the proposed standards. Their response is quantified by changes in several measures of financial performance for a firm. An Industry Impact Analysis shows financial and competitive impacts on the appliance industry. A Utility Analysis that measures the impacts of the altered energy-consumption patterns on electric utilities. A Environmental Effects analysis, which estimates changes in emissions of carbon dioxide, sulfur oxides, and nitrogen oxides, due to reduced energy consumption in the home and at the power plant. A Regulatory Impact Analysis collects the results of all the analyses into the net benefits and costs from a national perspective. 47 figs., 171 tabs. (JF)

  16. Reclamation fee on coal production: an example of federal regulatory taxation

    SciTech Connect (OSTI)

    Reese, C.E.

    1983-09-01

    The coal mining reclamation fee is part of the federal government's efforts to regulate the strip mining of coal and to use proceeds from the fee for land use and pollution control problems associated with abandoned mines. Authorized by the 1977 Surface Mining Contol and Reclamation Act rather than the Internal Revenue Code, the exaction is still shown to be both a regulatory and a severance tax. 41 references. (DCK)

  17. National Utility Rate Database: Preprint

    SciTech Connect (OSTI)

    Ong, S.; McKeel, R.

    2012-08-01

    When modeling solar energy technologies and other distributed energy systems, using high-quality expansive electricity rates is essential. The National Renewable Energy Laboratory (NREL) developed a utility rate platform for entering, storing, updating, and accessing a large collection of utility rates from around the United States. This utility rate platform lives on the Open Energy Information (OpenEI) website, OpenEI.org, allowing the data to be programmatically accessed from a web browser, using an application programming interface (API). The semantic-based utility rate platform currently has record of 1,885 utility rates and covers over 85% of the electricity consumption in the United States.

  18. Regulatory analysis technical evaluation handbook. Final report

    SciTech Connect (OSTI)

    1997-01-01

    The purpose of this Handbook is to provide guidance to the regulatory analyst to promote preparation of quality regulatory analysis documents and to implement the policies of the Regulatory Analysis Guidelines of the US Nuclear Regulatory Commission (NUREG/BR-0058 Rev. 2). This Handbook expands upon policy concepts included in the NRC Guidelines and translates the six steps in preparing regulatory analyses into implementable methodologies for the analyst. It provides standardized methods of preparation and presentation of regulatory analyses, with the inclusion of input that will satisfy all backfit requirements and requirements of NRC`s Committee to Review Generic Requirements. Information on the objectives of the safety goal evaluation process and potential data sources for preparing a safety goal evaluation is also included. Consistent application of the methods provided here will result in more directly comparable analyses, thus aiding decision-makers in evaluating and comparing various regulatory actions. The handbook is being issued in loose-leaf format to facilitate revisions. NRC intends to periodically revise the handbook as new and improved guidance, data, and methods become available.

  19. Category:Regulatory Roadmap State Sections | Open Energy Information

    Open Energy Info (EERE)

    Regulatory Roadmap State Sections Jump to: navigation, search GRR-logo.png Looking for the Regulatory Roadmap? Click here for a user-friendly list of Regulatory Roadmap pages. This...

  20. Regulatory Burden RFI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cheniere Energy, Inc. ("Cheniere") submits the following comments in response to the Department of Energy's ("DOE" or "Department") request for information and comments concerning "Reducing Regulatory Burden" published in the Federal Register on February 3, 2011. Regulatory Burden RFI (206.63 KB) More Documents & Publications Regulatory Burden RFI [76 FR 75798] SEMI-ANNUAL REPORTS FOR CHENIERE MARKETING, LLC - DK. NO. 12-99-LNG - ORDER 3164 Comments on

  1. Environmental regulatory guide for radiological effluent monitoring and environmental surveillance

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    Under the Atomic Energy Act of 1954, as amended, the US Department of Energy (DOE) is obligated to regulate its own activities so as to provide radiation protection for both workers and the public.'' Presidential Executive Order 12088, Federal Compliance with Pollution Control Standards,'' further requires the heads of executive agencies to ensure that all Federal facilities and activities comply with applicable pollution control standards and to take all actions necessary for the prevention, control, and abatement of environmental pollution. This regulatory guide describes the elements of an acceptable effluent monitoring and environmental surveillance program for DOE sites involving radioactive materials. These elements are applicable to all DOE and contractor activities for which the DOE exercises environmental, safety, and health responsibilities, and are intended to be applicable over the broad range of DOE facilities and sites. In situations where the high-priority elements may not provide sufficient coverage of a specific monitoring or surveillance topic, the document provides additional guidance. The high-priority elements are written as procedures and activities that should'' be performed, and the guidance is written as procedures and activities that should'' be performed. The regulatory guide both incorporates and expands on requirements embodied in DOE 5400.5 and DOE 5400.1. 221 refs., 2 figs., 6 tabs.

  2. Sandia National Laboratories: Pollution Prevention: Regulatory...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    buildings and procurement contracts that integrate sustainability into their operations. ... Pollution Prevention Act Department of Energy Strategic Sustainability Performance Plan ...

  3. Maryland State information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Handbook Series Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Maryland. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  4. Oregon state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  5. Oregon state information handbook formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administater, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  6. Massachusetts state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1981-02-09

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Massachusetts. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

  7. Pennsylvania state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  8. Iowa state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1981-02-09

    This volume is one of a series produced under contract with the DOE, By Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Iowa. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations.

  9. Paperwork Reduction Act Form | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Form Paperwork Reduction Act Form Collection Discontinuation Form Paperwork Reduction Act Form (17.93 KB) More Documents & Publications OMB83 D Discontinuance Form OMB 83 C Paperwork Reduction Act Submission (OMB 83-I)

  10. DOE - NNSA/NFO -- Privacy Act Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Privacy Act Information NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Privacy Act Overview The Privacy Act of 1974, Title 5, United States Code, Section 552a, ...

  11. Municipal Utilities' Investment in Smart Grid Technologies Improves Services and Lowers Costs

    Broader source: Energy.gov [DOE]

    OE has released a new Smart Grid report describing the activities of three municipal utilities that received funding through the Recovery Act Smart Grid Investment Grant program. "Municipal Utilities' Investment in Smart Grid Technologies Improves Services and Lowers Costs" reports on the benefits of the cities' investments, including improved operating efficiencies, lower costs, shorter outages, and reduced peak demands and electricity consumption.

  12. DEMEC Member Utilities- Green Energy Program Incentives (8 utilities)

    Office of Energy Efficiency and Renewable Energy (EERE)

    Delaware's municipal utilities provide incentives for solar photovoltaic (PV), solar thermal, wind, geothermal, and fuel cell systems installed by their electric customers. Eligibility is limited...

  13. Maryland-National Capital Building Industry Association Regulatory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maryland-National Capital Building Industry Association Regulatory Burden RFI (Federal Register August 8, 2012) Maryland-National Capital Building Industry Association Regulatory ...

  14. US Nuclear Regulatory Commission Input to DOE Request for Information...

    Energy Savers [EERE]

    US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input US Nuclear Regulatory Commission Input to DOE Request for Information Smart ...

  15. Effective Regulatory Institutions: The Regulator's Role in the...

    Open Energy Info (EERE)

    Regulatory Institutions: The Regulator's Role in the Policy Process, Including Issues of Regulatory Independence Jump to: navigation, search Tool Summary LAUNCH TOOL Name:...

  16. Sandia Energy - Policy and Regulatory, Codes and Standards

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policy and Regulatory, Codes and Standards Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics Solar Market Transformation Policy and Regulatory, Codes...

  17. Washington Air Quality Notice of Construction Permit Regulatory...

    Open Energy Info (EERE)

    Air Quality Notice of Construction Permit Regulatory Handbook Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook:...

  18. April Tribal Webinar on Energy Policy and Regulatory Environment...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April Tribal Webinar on Energy Policy and Regulatory Environment Rescheduled for May 4 April Tribal Webinar on Energy Policy and Regulatory Environment Rescheduled for May 4 April ...

  19. Category:Geothermal Regulatory Roadmap Sections | Open Energy...

    Open Energy Info (EERE)

    Geothermal Regulatory Roadmap Sections Jump to: navigation, search GRR-logo.png Looking for the Geothermal Regulatory Roadmap? Click here for a user-friendly list of Geothermal...

  20. Category:Regulatory Roadmap Federal Sections | Open Energy Information

    Open Energy Info (EERE)