National Library of Energy BETA

Sample records for utah final environmental

  1. DOE Issues Final Environmental Impact Statement for Moab, Utah Site |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Environmental Impact Statement for Moab, Utah Site DOE Issues Final Environmental Impact Statement for Moab, Utah Site July 25, 2005 - 2:27pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its final environmental impact statement (EIS) for the Moab Uranium Mill Tailings Remedial Action Project Site, located on the bank of the Colorado River. The EIS details the preferred option of removal of the tailings pile and contaminated materials, along

  2. EA-1870: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1870: Final Environmental Assessment Utah Coal and Biomass Fueled Pilot Plant, Kanab, UT The U.S. Department of Energy (DOE) prepared this...

  3. EIS-0450: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Final Environmental Impact Statement EIS-0450: Final Environmental Impact Statement TransWest Express Transmission Project; Wyoming, Colorado, Utah, and Nevada Download Document ...

  4. Final Environmental Impact Statement to construct and operate a facility to receive, store, and dispose of 11e.(2) byproduct material near Clive, Utah (Docket No. 40-8989)

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    A Final Environmental Impact Statement (FEIS) related to the licensing of Envirocare of Utah, Inc.`s proposed disposal facility in Tooele county, Utah (Docket No. 40-8989) for byproduct material as defined in Section 11e.(2) of the Atomic Energy Act, as amended, has been prepared by the Office of Nuclear Material Safety and Safeguards. This statement describes and evaluates the purpose of and need for the proposed action, the alternatives considered, and the environmental consequences of the proposed action. The NRC has concluded that the proposed action evaluated under the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51, is to permit the applicant to proceed with the project as described in this Statement.

  5. Environmental assessment: Davis Canyon site, Utah

    SciTech Connect (OSTI)

    none,

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Davis Canyon site in Utah as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high- level radioactive waste. To determine their suitability, the Davis Canyon site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EA. The Davis Canyon site is in the Paradox Basin, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains one other potentially acceptable site -- the Lavender Canyon site. Although the Lavender Canyon site is suitable for site characterization, the DOE has concluded that the Davis Canyon site is the preferred site in the Paradox Basin. On the basis of the evaluations reported in this EA, the DOE has found that the Davis Canyon site is not disqualified under the guidelines. Furthermore, the DOE has found that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is nominating the Davis Canyon site as one of the five sites suitable for characterization.

  6. Environmental assessment: Davis Canyon site, Utah

    SciTech Connect (OSTI)

    none,

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Davis Canyon site in Utah as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Davis Canyon site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EA. The Davis Canyon site is in the Paradox Basin, which is one of five distinct geohydrologic settings considering for the first repository. This setting contains one other potentially acceptable site -- the Lavender Canyon site. Although the Lavender Canyon site is suitable for site characterization, the DOE has concluded that the Davis Canyon site is the preferred site in the Paradox Basin. On the basis of the evaluations reported in this EA, the DOE has found that the Davis Canyon site is not disqualified under the guidelines. Furthermore, the DOE has found that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is nominating the Davis Canyon site as one of five sites suitable for characterization.

  7. DOE/EIS-0355 Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Final Environmental Impact Statement (July 2005)

    SciTech Connect (OSTI)

    N /A

    2005-08-05

    The U.S. Department of Energy (DOE or the Department) is proposing to clean up surface contamination and implement a ground water compliance strategy to address contamination that resulted from historical uranium-ore processing at the Moab Uranium Mill Tailings Site (Moab site), Grand County, Utah. Pursuant to the National Environmental Policy Act (NEPA), 42 United States Code (U.S.C.) {section} 4321 et seq., DOE prepared this environmental impact statement (EIS) to assess the potential environmental impacts of remediating the Moab site and vicinity properties (properties where uranium mill tailings were used as construction or fill material before the potential hazards associated with the tailings were known). DOE analyzed the potential environmental impacts of both on-site and off-site remediation and disposal alternatives involving both surface and ground water contamination. DOE also analyzed the No Action alternative as required by NEPA implementing regulations promulgated by the Council on Environmental Quality. DOE has determined that its preferred alternatives are the off-site disposal of the Moab uranium mill tailings pile, combined with active ground water remediation at the Moab site. The preferred off-site disposal location is the Crescent Junction site, and the preferred method of transportation is rail. The basis for this determination is discussed later in this Summary. DOE has entered into agreements with 12 federal, tribal, state, and local agencies to be cooperating agencies in the development and preparation of this EIS. Several of the cooperating agencies have jurisdiction by law and intend to use the EIS to support their own decisionmaking. The others have expertise relevant to potential environmental, social, or economic impacts within their geographic regions. During the preparation of the EIS, DOE met with the cooperating agencies, provided them with opportunities to review preliminary versions of the document, and addressed their comments

  8. Utah Department of Environmental Quality Hazardous Waste Permits...

    Open Energy Info (EERE)

    Hazardous Waste Permits Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Utah Department of Environmental Quality Hazardous Waste Permits...

  9. Utah Division of Environmental Response and Remediation Underground...

    Open Energy Info (EERE)

    Environmental Response and Remediation Underground Storage Tank Branch Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Utah Division of...

  10. Environmental assessment: Davis Canyon site, Utah

    SciTech Connect (OSTI)

    none,

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Davis Canyon site in Utah as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Davis Canyon site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EA. The Davis Canyon site is in the Paradox Basin, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains one other potentially acceptable site -- the Lavender Canyon site. Although the Lavender Canyon site is suitable for site characterization, the DOE has concluded that the Davis Canyon site is the preferred site in the Paradox Basin. On the basis of the evaluations reported in this EA, the DOE has found that the Davis Canyon site is not disqualified under the guidelines. Furthermore, the DOE has fond that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is nominating the Davis Canyon site as one of five sites suitable for characterization. 181 figs., 175 tabs.

  11. Utah Department of Environmental Quality Forms Webpage | Open...

    Open Energy Info (EERE)

    Forms Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Utah Department of Environmental Quality Forms Webpage Abstract Provides access to forms...

  12. EIS-0099: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    EIS-0099: Final Environmental Impact Statement Remedial Actions at the Former Vitro Chemical Company Site, South Salt Lake, Salt Lake County, Utah The U.S. Department of Energy ...

  13. Final Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS - 0097-F c f ` f= �c J m s= Final Environmental Impact Statement BONNEVILLE POWER ADMINISTRATION TRANSMISSION FACILITIES VEGETATION MANAGEMENT PROGRAM U.S. Department of Energy August 1983 Appendices albLbfp= J MMVTJc= Responsible Official: tfiif^j= ^K= s^rde^k= Assistant Secretary for Environmental Protection. Safety, and Emergency Prepafedness Final Environmental Impact Statement BONNEVILLE POWER ADM IN ISTRA TION TRANSMISSION FACILITIES VEGETATION MANAGEMENT PROGRAM U.S. Department of

  14. Utah Department of Environmental Quality | Open Energy Information

    Open Energy Info (EERE)

    laws and works with individuals, community groups, and businesses to protect the quality of our air, land and water in the state of Utah. The following Divisions make up...

  15. Utah DEQ Air Permitting Branch Webpage | Open Energy Information

    Open Energy Info (EERE)

    link for Utah DEQ Air Permitting Branch Webpage Citation Utah Department of Environmental Quality. Utah DEQ Air Permitting Branch Webpage Internet. State of Utah. cited 201411...

  16. Utah Air Guidance Documents Webpage | Open Energy Information

    Open Energy Info (EERE)

    link for Utah Air Guidance Documents Webpage Citation Utah Department of Environmental Quality. Utah Air Guidance Documents Webpage Internet. State of Utah. cited 201411...

  17. EIS-0481: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Final Programmatic Environmental Impact Statement EIS-0481: Final Programmatic Environmental Impact Statement Engineered High Energy Crop Programs Programmatic Environmental ...

  18. Environmental Survey preliminary report, Naval Petroleum and Oil Shale Reserves in Colorado, Utah, and Wyoming, Casper, Wyoming

    SciTech Connect (OSTI)

    Not Available

    1989-02-01

    This report presents the preliminary environmental findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Naval Petroleum and Oil Shale Reserves in Colorado, Utah, and Wyoming (NPOSR-CUW) conducted June 6 through 17, 1988. NPOSR consists of the Naval Petroleum Reserve No. 3 (NPR-3) in Wyoming, the Naval Oil Shale Reserves No. 1 and 3 (NOSR-1 and NOSR-3) in Colorado and the Naval Oil Shale Reserve No. 2 (NOSR-2) in Utah. NOSR-2 was not included in the Survey because it had not been actively exploited at the time of the on-site Survey. The Survey is being conducted by an interdisciplinary team of environmental specialists, lead and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team specialists are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with NPOSR. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at NPOSR and interviews with site personnel. The Survey team has developed a Sampling and Analysis Plan to assist in further assessing specific environmental problems identified at NOSR-3 during the on-site Survey. There were no findings associated with either NPR-3 or NOSR-1 that required Survey-related sampling and Analysis. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory. When completed, the results will be incorporated into the Environmental Survey Summary report. The Summary Report will reflect the final determinations of the NPOSR-CUW Survey and the other DOE site-specific Surveys. 110 refs., 38 figs., 24 tabs.

  19. EIS-0161: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    61: Final Programmatic Environmental Impact Statement EIS-0161: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain ...

  20. EIS-0229: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Programmatic Environmental Impact Statement EIS-0229: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain ...

  1. ERDA-1537: Final Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ERDA-1537: Final Environmental Impact Statement ERDA-1537: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on ...

  2. EIS-0269: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    69: Final Programmatic Environmental Impact Statement EIS-0269: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain ...

  3. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    SciTech Connect (OSTI)

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites.

  4. Final Uranium Leasing Program Programmatic Environmental Impact...

    Energy Savers [EERE]

    Uranium Leasing Program Programmatic Environmental Impact Statement (PEIS) Final Uranium Leasing Program Programmatic Environmental Impact Statement (PEIS) Uranium Leasing ...

  5. Utah DEQ Website | Open Energy Information

    Open Energy Info (EERE)

    Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Utah DEQ Website Author Utah Department of Environmental Quality Published Utah Department of...

  6. EIS-0472: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0472: Final Programmatic Environmental Impact Statement Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, Colorado This EIS evaluated the environmental impacts ...

  7. EIS-0440: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0440: Final Environmental Impact Statement Quartzsite Solar Energy Project The Final Environmental Impact Statement (FEIS) consists of a ...

  8. EIS-0271: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0271: Final Environmental Impact Statement ... This EIS is linked to the Final Programmatic Environmental Impact Statement for Tritium ...

  9. EIS-0370: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0370: Final Environmental Impact Statement Windy Gap Firming Project, Colorado Download Document EIS-0370: Final Environmental Impact Statement ...

  10. EIS-0089: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Impact Statement EIS-0089: Final Environmental Impact Statement ... The final environmental impact statement (EIS) consists of the draft EIS and the Addendum ...

  11. EIS-0447: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0447: Final Environmental Impact Statement DOE prepared this Final EIS to evaluate the potential environmental impacts of a DOE proposal to ...

  12. EIS-0102: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    83 Wholesale Power Rate EIS-0102: Final Environmental Impact Statement More Documents & Publications EIS-0071: Final Environmental Impact Statement EIS-0202: Final Environmental...

  13. EA-1728: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1728: Final Environmental Assessment Final Environmental Assessment for Integrated Vegetation Management of the Hanford Site, Richland, WA This EA...

  14. EA-1008: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1008: Final Environmental Assessment EA-1008: Final Environmental Assessment Continued ... Environmental Assessment EA-1236: Finding of No Significant Impact EA-1956: Final

  15. EIS-0312: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0312: Final Environmental Impact Statement Fish and Wildlife Implementation Plan In this final environmental impact statement (FEIS), with...

  16. EA-1207: Final Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Pit Disassembly and Conversion Demonstration Environmental Assessment and Research and Development Activities

  17. EA-1391: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Environmental Assessment for Presidential Permit Applications for Baja California, Inc. and Sempra Energy Resources

  18. EA-1083: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    New Silt/Clay Source Development and Use at the Idaho National Engineering and Environmental Laboratory

  19. EA-0995: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Drum Storage Facility for Interim Storage of Materials Generated by Environmental Restoration Operations

  20. EA-1143: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Environmental Evaluation Notification Form for University of Nebraska Medical Center: Lied Transplant Center

  1. EA-1959: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Assessment EA-1959: Final Environmental Assessment Eightmile Ranch ... EA-1959: Draft Environmental Assessment EIS-0425: Draft Environmental Impact Statement ...

  2. EIS-0083: Final Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Final Northeast Regional Environmental Impact Statement; The Potential Conversion of Forty-Two Powerplants From Oil to Coal or Alternate Fuels

  3. Bureau of Land Management - Final Programmatic Environmental...

    Open Energy Info (EERE)

    to: navigation, search OpenEI Reference LibraryAdd to library Report: Bureau of Land Management - Final Programmatic Environmental Impact Statement for Geothermal Leasing in the...

  4. EA-1535: Final Programmatic Environmental Assessment | Department...

    Energy Savers [EERE]

    EA-1535: Final Programmatic Environmental Assessment Uranium Leasing Program Office of Legacy Management (LM) is evaluating its Uranium Leasing Program to determine a strategy for ...

  5. Paducah Gaseous Diffusion Plant Final Environmental Assessment...

    Energy Savers [EERE]

    Point of contact for more information: Robert Smith, Department of Energy-Paducah Paducah Gaseous Diffusion Plant Final Environmental Assessment for Potential Land and Facilities ...

  6. EA-1764: Final Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Spruce and Peatland Responses Under Climatic and Environmental Change Experiment (SPRUCE) Marcell Experimental Forest, Itasca County, Minnesota

  7. EA-1958: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Future Development in Proximity to the William R. Wiley Environmental Molecular Sciences Laboratory, Pacific Northwest National Laboratory, Richland, Washington

  8. EA-0372: Final Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Standards for Consumer Products: Refrigerators, Furnaces and Television Sets including Environmental Assessment Regulatory Impact Analysis

  9. EA-1974: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1974: Final Environmental Assessment Wallooskee-Youngs Confluence Restoration Project; Clatsop County, Oregon Bonneville Power Administration ...

  10. EIS-0097: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Final Environmental Impact Statement EIS-0097: Final Environmental Impact Statement Bonneville Power Administration Transmission Facilities Vegetation Management Program The ...

  11. EA-1736: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Expansion of the Sanitary Effluent Reclamation Facility and Environmental Restoration of Reach S-2 of Sandia Canyon at Los Alamos National Laboratory, Los Alamos, New Mexico

  12. EA-1956: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Site-Wide Environmental Assessment for the Divestiture of Rocky Mountain Oilfield Testing Center and Naval Petroleum Reserve No. 3, Natrona County, Wyoming

  13. EA-1310: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Decontamination and Dismantlement of the Advanced Reactivity Measurement Facility and Coupled Fast Reactivity Measurements Facility at the Idaho National Engineering and Environmental Laboratory

  14. EA-1637: Final Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    10 CFR 431 Energy Conservation Program for Commerical and Industrial Equipment: Packaged Terminal Air Conditioner and Packaged Terminal Heat Pump Energy Conservation Standards; Final Rule

  15. Environmental Prosperity Game. Final report

    SciTech Connect (OSTI)

    Berman, M.; Boyack, K.; VanDevender, J.P.

    1995-12-01

    Prosperity Games are an outgrowth and adaptation of move/countermove and seminar War Games. Prosperity Games are simulations that explore complex issues in a variety of areas including economics, politics, sociology, environment, education and research. These issues can be examined from a variety of perspectives ranging from a global, macroeconomic and geopolitical viewpoint down to the details of customer/supplier/market interactions in specific industries. All Prosperity Games are unique in that both the game format and the player contributions vary from game to game. This report documents the Environmental Prosperity Game conducted under the sponsorship of the Silicon Valley Environmental Partnership. Players were drawn from all stakeholders involved in environmental technologies including small and large companies, government, national laboratories, universities, environmentalists, the legal profession, finance, and the media. The primary objectives of this game were to: investigate strategies for developing a multi-agency (national/state/regional), one-step regulatory approval process for certifying and implementing environmental technologies and evaluating the simulated results; identify the regulatory hurdles and requirements, and the best approaches for surmounting them; identify technical problems and potential resources (environmental consultants, labs, universities) for solving them. The deliberations and recommendations of these players provided valuable insights as to the views of this diverse group of decision makers concerning environmental issues, including the development, licensing, and commercialization of new technologies.

  16. Geothermal heating retrofit at the Utah State Prison Minimum Security Facility. Final report, March 1979-January 1986

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    This report is a summary of progress and results of the Utah State Prison Geothermal Space Heating Project. Initiated in 1978 by the Utah State Energy Office and developed with assistance from DOE's Division of Geothermal and Hydropower Technologies PON program, final construction was completed in 1984. The completed system provides space and water heating for the State Prison's Minimum Security Facility. It consists of an artesian flowing geothermal well, plate heat exchangers, and underground distribution pipeline that connects to the existing hydronic heating system in the State Prison's Minimum Security Facility. Geothermal water disposal consists of a gravity drain line carrying spent geothermal water to a cooling pond which discharges into the Jordan River, approximately one mile from the well site. The system has been in operation for two years with mixed results. Continuing operation and maintenance problems have reduced the expected seasonal operation from 9 months per year to 3 months. Problems with the Minimum Security heating system have reduced the expected energy contribution by approximately 60%. To date the system has saved the prison approximately $18,060. The total expenditure including resource assessment and development, design, construction, performance verification, and reporting is approximately $827,558.

  17. EA-1775: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1775: Final Environmental Assessment Texas A&M University Combined Heat and Power Project, College Station, Texas DOE prepared this Environmental ...

  18. EIS-0414: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0414: Final Environmental Impact Statement Energia Sierra Juarez Transmission Project This EIS evaluates the potential environmental ...

  19. EIS-0333: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Impact Statement EIS-0333: Final Environmental Impact Statement Bonneville Power Administration, Maiden Wind Farm This Draft Environmental Impact Statement...

  20. EA-1262: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    62: Final Environmental Assessment EA-1262: Final Environmental Assessment McKay Bypass Canal Extension This EA evaluates the environmental impacts for the proposal to extend the ...

  1. EA-1541: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    41: Final Environmental Assessment EA-1541: Final Environmental Assessment Demolition of Building 51 and the Bevatron at Lawrence Berkeley National Laboratory This Environmental...

  2. EIS-0332: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0332: Final Environmental Impact Statement McNary-John Day Transmission Line Project This document is the final Environmental Impact Statement...

  3. EA-1917: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1917: Final Environmental Assessment Wave Energy Test Facility Project, Newport, OR This EA evaluates the potential environmental impacts of a ...

  4. EIS-0290: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0290: Final Environmental Impact Statement Advanced Mixed Waste Treatment Project (AMWTP) The AMWTP Final EIS assesses the potential ...

  5. EIS-0407: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0407: Final Environmental Impact Statement ... The Final Abengoa Biorefinery Project EIS evaluates the potential direct, indirect, and ...

  6. EIS-0496: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0496: Final Environmental Impact Statement San ... and state lead agencies, issued a final EISEnvironmental Impact Report that assesses ...

  7. EIS-0336: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0336: Final Environmental Impact Statement Tucson ... The Final EIS will be used by DOE and the Federal agency officials to ensure that they ...

  8. EIS-0306: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0306: Final Environmental Impact Statement Treatment and Management of Sodium-Bonded Spent Nuclear Fuel DOE prepared a Final EIS that...

  9. EA-1979: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1979: Final Environmental Assessment Summit Wind Farm; Summit, South Dakota Western Area Power Administration (Western) issued a final EA that ...

  10. EIS-0337: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0337: Final Environmental Impact Statement West Valley Demonstration Project Waste Management The purpose of the Final West Valley ...

  11. Supplemental Analysis for the Final Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplemental Analysis for the Final Environmental Impact Statement Supplemental Analysis for the Final Environmental Impact Statement Supplemental Analysis for the Final ...

  12. EA-1818: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Final Environmental Assessment EA-1818: Final Environmental Assessment Pettisville ... More Documents & Publications EA-1818: Finding of No Significant Impact EA-1820: Final ...

  13. EA-1984: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1984: Final Environmental Assessment Disposition of Five Signature Properties at Idaho National Laboratory This Final EA evaluates the impacts of...

  14. EA-2011: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Proposed Release of Three Parasitoids for the Biological Control of the Emerald Ash Borer (Agrilus Planipennis) in the Continental United States The DOE Oak Ridge Office reviewed and adopted a July 2007 EA prepared by the USDA Animal and Plant Health Inspection Service that analyzed the potential environmental impacts of the release of three parasitoids into the continental U.S. for the biological control of the emerald ash borer, a nonnative invasive beetle.

  15. EIS-0386: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0386: Final Programmatic Environmental Impact Statement Designation of Energy Corridors on Federal Land in the 11 Western States EIS-0386-FEIS-Summary-2008.pdf (2.33 MB) ...

  16. EIS-0403: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0403: Final Programmatic Environmental Impact Statement Solar Energy Development in ... in Six Southwestern States (4.31 MB) EIS-0403-Comments-on-Supp-to-Solar-DEIS--20001-...

  17. EIS-0018: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Final Environmental Impact Statement EIS-0018: Final Environmental Impact Statement Continued Operation of Los Alamos Scientific Laboratory Site, Los Alamos, New Mexico EIS-0018: Final Environmental Impact Statement (11.84 MB) More Documents & Publications EIS-0085-S: Final Environmental Impact Statement EIS-0098: Draft Environmental Impact Statement EIS-0098: Final

  18. EIS-0015: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Final Environmental Impact Statement EIS-0015: Final Environmental Impact Statement U.S. Spent Fuel Policy EIS-0015: Final Environmental Impact Statement, volume 1 (1.45 MB) ...

  19. EIS-0317-S1: Final Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Supplemental Environmental Impact Statement EIS-0317-S1: Final Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project Bonneville Power...

  20. EIS-0471: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0468: Final Environmental Impact Statement EA-1607: Final Environmental Assessment Disposition of DOE Excess Depleted Uranium, Natural Uranium, and Low-Enriched Uranium...

  1. EIS-0072: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0072: Final Environmental Impact Statement Great Plains Gasification Project, Mercer County, North Dakota PDF icon EIS-0072: Final Environmental Impact Statement, Volume 1 PDF ...

  2. EA-1506: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    06: Final Environmental Assessment EA-1506: Final Environmental Assessment Changing World Technologies' Thermal Conversion Process Commercial Demonstration Plant The purpose of the ...

  3. EIS-0468: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Final Environmental Impact Statement EIS-0468: EPA Notice of Availability of the Final Environmental Impact Statement American Centrifuge Plant, ...

  4. EIS-0139: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    139: Final Environmental Impact Statement EIS-0139: Final Environmental Impact Statement Trans-Alaska Gas System EIS-0139-FEIS-1988.pdf (37.74 MB) More Documents & Publications ...

  5. EIS-0171: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    71: Final Environmental Impact Statement EIS-0171: Final Environmental Impact Statement Bonneville Power Administration, PacifiCorp Capacity Power Sale Contract The Bonneville ...

  6. EIS-0116: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Final Environmental Impact Statement EIS-0116: Final Environmental Impact Statement Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project PDF icon ...

  7. EIS-0073: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Impact Statement EIS-0073: Final Environmental Impact Statement Solvent Refined Coal-I Demonstration Project, Daviess County, Kentucky PDF icon ...

  8. EIS-0145: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Final Environmental Impact Statement EIS-0145: Final Environmental Impact Statement Non-Federal Participation in Alternating Current Intertie PDF icon DOEEIS-0145, Bonneville ...

  9. EIS-0455: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0455: Final Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA The BLM's purpose and need for the GSEP is to...

  10. EIS-0471: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Final Environmental Impact Statement EIS-0471: Final Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho The U.S. Department of Energy...

  11. EIS-0454: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0454: Final Environmental Impact Statement Tonopah Solar Energy Crescent Dunes Solar Energy Project PDF icon EIS-0454-FEIS-2011.pdf More...

  12. EIS-0343: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0343: Final Environmental Impact Statement COB Energy Facility COB Energy Facility, LLC, a subsidiary of Peoples Energy Resources Company...

  13. EIS-0359: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0359: Final Environmental Impact Statement ... This site-specific EIS considers the construction, operation, maintenance, and ...

  14. EIS-0391: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0391: Final Environmental Impact Statement Hanford Tank Closure and Waste Management, Hanford Site, Richland, WA This EIS evaluates the ...

  15. EIS-0064: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0064: Final Environmental Impact Statement Rocky Flats Plant Site, Jefferson County, Golden, Colorado (see also ERDA-1545-D) EIS-0064: Final Environmental Impact Statement, ...

  16. EIS-0354: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: Final Environmental Impact Statement EIS-0354: Final Environmental Impact Statement ... near-term and future power needs.The Draft EIS (published in November 2002) evaluated ...

  17. EIS-0243: Final Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    3: Final Environmental Impact Statement EIS-0243: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  18. EIS-0228: Final Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    8: Final Environmental Impact Statement EIS-0228: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  19. EA-1955: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1955: Final Environmental Assessment Campbell County Wind Farm; Campbell County, South Dakota Western Area Power Administration (Western) issued a ...

  20. EIS-0377: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0377: Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project A systems study was carried out to identify...

  1. EIS-0421: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0421: Final Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA PDF icon...

  2. EA-1938: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1938: Final Environmental Assessment Grieve Unit CO2 Enhanced Recovery Project, Natrona County, WY The Bureau of Land Management prepared, with...

  3. EA-1995: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Assessment EA-1995: Final Environmental Assessment Trestle Bay Ecosystem Restoration Project, Clatsop County, Oregon The U.S. Army Corps of Engineers issued a ...

  4. EA-1923: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Assessment EA-1923: Final Environmental Assessment Green Energy School Wind Turbine Project on Saipan, Commonwealth of the Northern Mariana Islands This EA ...

  5. EIS-0423: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    : EPA Notice of Availability of the Final Environmental Impact Statement EIS-0423: EPA Notice of Availability of the Final Environmental Impact Statement Long -Term Management and ...

  6. EIS-0409: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Final Environmental Impact Statement EIS-0409: EPA Notice of Availability of the Final Environmental Impact Statement Kemper County Integrated ...

  7. EIS-0450: EPA Notice of Availability of a Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of a Final Environmental Impact Statement EIS-0450: EPA Notice of Availability of a Final Environmental Impact Statement TransWest Express Transmission ...

  8. EIS-0435: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0435: EPA Notice of Availability of the Final Environmental Impact Statement Groton Generation Station ...

  9. EIS-0336: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Final Environmental Impact Statement EIS-0336: EPA Notice of Availability of the Final Environmental Impact Statement Tucson Electric Power ...

  10. EA-1772: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1772: Final Environmental Assessment Multipurpose Haul ... The U.S. Department of Energy (DOE) proposes to provide an alternative route, other than ...

  11. EIS-0060: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0060: Final Environmental Impact Statement Bonneville Power Administration Proposed FY 1981 Program PDF icon EIS-0060: Final Environmental Impact Statement More Documents & ...

  12. EA-1819: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Assessment EA-1819: Final Environmental Assessment Kilowatts for Kenston Wind Energy Project, Chagrin Falls, Geauga County The Department of Energy has ...

  13. EA-1975: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1975: Final Environmental Assessment Linac Coherent Light Source-IL, SLAC National Accelerator Laboratory, Menlo Park, California DOE issued a ...

  14. EA-1820: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    20: Final Environmental Assessment EA-1820: Final Environmental Assessment Archbold Area Local School Wind Project Archbold, Fulton County, Ohio The U.S. Department of Energy (DOE) ...

  15. EA-1839: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    39: Final Environmental Assessment and Finding of No Significant Impact EA-1839: Final Environmental Assessment and Finding of No Significant Impact Department of Energy Loan ...

  16. EA-1972: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1972: Final Environmental Assessment Electric District 2 to Saguaro No. 2 Transmission Line Rebuild, Pinal County, Arizona Western Area Power ...

  17. EA-1891: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1891: Final Environmental Assessment Alvey-Fairview Transmission Line Rebuild Project, Oregon Bonneville Power Administration prepared an EA to ...

  18. EA-1807: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Final Environmental Assessment EA-1807: Final Environmental Assessment Heartland Community College Wind Energy Project, Normal, McLean County, Illinois DOE has provided a State ...

  19. EA-1934: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1934: Final Environmental Assessment Expansion of Active Borrow Areas, Hanford Site, Richland, Washington This EA evaluates the potential ...

  20. EA-1800: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1800: Final Environmental Assessment Monarch Warren County Wind Turbine Project The U.S. Department of Energy (DOE) has provided Federal funding...

  1. EA-1906: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1906: Final Environmental Assessment Operations, Upgrades, and Consolidation at the Western Command Site, NM This NNSA EA evaluates the potential...

  2. EA-1829: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment and Finding of No Significant Impact EA-1829: Final Environmental Assessment and Finding of No Significant Impact Phycal Algae Pilot Project, Wahiawa...

  3. EA-1593: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Assessment EA-1593: Final Environmental Assessment Y-12 Steam Plant Life Extenstion Project - Steam Plant Replacement Subproject The National Nuclear...

  4. EA-1960: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1960: Final Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada The Bureau of Land Management, with Western...

  5. EA-1826: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1826: Final Environmental Assessment AV Solar Ranch One Project, Los Angeles and Kern Counties, California The U.S. Department of Energy (DOE) is...

  6. EA-1866: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Final Environmental Assessment and Finding of No Significant Impact EA-1866: Final Environmental Assessment and Finding of No Significant Impact Argonne National Laboratory...

  7. EA-1889: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment and Finding of No Significant Impact EA-1889: Final Environmental Assessment and Finding of No Significant Impact Disposal of Decommissioned,...

  8. EA-1869: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    69: Final Environmental Assessment and Finding of No Significant Impact EA-1869: Final Environmental Assessment and Finding of No Significant Impact General Motors LLC, Electric...

  9. EA-1510: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Final Environmental Assessment EA-1510: Final Environmental Assessment Alternate Financed Facility Modernization The purpose of the Proposed Action is to transfer two parcels of...

  10. EA-1905: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Final Environmental Assessment EA-1905: Final Environmental Assessment Department of Energy Funding For Double Eagle Water System, Carlsbad, New Mexico (November 2011) For more...

  11. EA-1769: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Assessment and Finding of No Significant Impact EA-1769: Final Environmental Assessment and Finding of No Significant Impact Houston Advanced Research...

  12. EA-1602: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Final Environmental Assessment EA-1602: Final Environmental Assessment Alternative Intake Project Transmission Line and Interconnection As part of its comprehensive water...

  13. EA-1884: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1884: Final Environmental Assessment Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO DOE's Western Area...

  14. Final Environmental Impact Statement Brings DOE Closer to Disposing...

    Office of Environmental Management (EM)

    Final Environmental Impact Statement Brings DOE Closer to Disposing Unique Waste Final Environmental Impact Statement Brings DOE Closer to Disposing Unique Waste March 16, 2016 - ...

  15. EIS-0309: Final Site-Wide Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Site-Wide Environmental Impact Statement EIS-0309: Final Site-Wide Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA ...

  16. EIS-0219: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Impact Statement EIS-0219: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  17. EIS-0270: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Final Environmental Impact Statement EIS-0270: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  18. EIS-0376: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0376: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  19. EIS-0375: DOE Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: DOE Notice of Availability of Final Environmental Impact Statement EIS-0375: DOE Notice of Availability of Final Environmental Impact Statement Disposal of Greater-than-Class-C ...

  20. EIS-0486: DOE Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Availability of Final Environmental Impact Statement EIS-0486: DOE Notice of Availability of Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project ...

  1. EIS-0217: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Final Environmental Impact Statement EIS-0217: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  2. EIS-0499: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Final Environmental Impact Statement EIS-0499: EPA Notice of Availability of Final Environmental Impact Statement Great Northern Transmission Line ...

  3. EIS-0068: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Final Environmental Impact Statement EIS-0068: Final Environmental Impact Statement Development Policy Options for the Naval Oil Shale Reserves in Colorado PDF icon EIS-0068: ...

  4. EIS-0249: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    49: Final Environmental Impact Statement EIS-0249: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  5. EIS-0297: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    297: Final Environmental Impact Statement EIS-0297: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  6. EA-1952: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1952: Final Environmental Assessment Lane-Wendson No. 1 ... More Documents & Publications EA-1952: Finding of No Significant Impact EA-1952: Draft

  7. EA-1855: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1855: Final Environmental Assessment Creston-Bell Rebuild Project, Lincoln and Spokane Counties, Washington (aka DOEEA-4406) This EA evaluates...

  8. EIS-0485: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0485: Final Environmental Impact Statement Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska DOE's Western Area Power ...

  9. EIS-0108: Final Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    08: Final Environmental Impact Statement EIS-0108: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  10. LM Issues Final Programmatic Environmental Impact Statement on...

    Energy Savers [EERE]

    Issues Final Programmatic Environmental Impact Statement on the Uranium Leasing Program LM Issues Final Programmatic Environmental Impact Statement on the Uranium Leasing Program ...

  11. EIS-0082-S1: Final Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    S1: Final Supplemental Environmental Impact Statement EIS-0082-S1: Final Supplemental Environmental Impact Statement The Department of Energy (DOE) limits electronic access to ...

  12. EIS-0095: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    5: Final Environmental Impact Statement EIS-0095: Final Environmental Impact Statement Bonneville Power Administration's Expanded Residential Weatherization Program The U.S....

  13. EA-1611-S1: Final Supplemental Environmental Assessment | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Supplemental Environmental Assessment Colorado Highlands Wind Project, Logan County, Colorado DOE's Western Area Power Administration issued a final supplemental...

  14. Davis County, Utah: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Utah Fruit Heights, Utah Kaysville, Utah Layton, Utah North Salt Lake, Utah South Weber, Utah Sunset, Utah Syracuse, Utah West Bountiful, Utah West Point, Utah Woods Cross,...

  15. Salt Lake County, Utah: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Creek Valley, Utah Magna, Utah Midvale, Utah Millcreek, Utah Mount Olympus, Utah Murray, Utah Riverton, Utah Salt Lake City, Utah Sandy, Utah South Jordan, Utah South Salt...

  16. EIS-0441: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement More Documents & Publications EIS-0403: Final Programmatic Environmental Impact Statement EA-1989: Draft Environmental Assessment EA-1581: Draft Environmental Assessment...

  17. Final Guidance for Consideration of Environmental Justice in...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Consideration of Environmental Justice in Clean Air Act 309 Reviews Final Guidance for Consideration of Environmental Justice in Clean Air Act 309 Reviews This Environmental ...

  18. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Mexican Hat, Utah: Appendix D. Final report

    SciTech Connect (OSTI)

    1988-07-01

    This appendix is an assessment of the present conditions of the inactive uranium mill site near Mexican Hat, Utah. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan. Plan is to characterize the conditions at the mill and tailings site so that the Remedial Action Contractor may complete final designs of the remedial action.

  19. EIS-0026-S: Final Supplemental Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Final Supplemental Environmental Impact Statement, Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico

  20. Environmental assessment of remedial action at the Mexican Hat uranium mill tailings site, Mexican Hat, Utah. [Contains glossary

    SciTech Connect (OSTI)

    Not Available

    1987-10-01

    This document assesses the environmental impacts of the proposed remedial action at the Mexican Hat uranium mill tailings site located on the Navajo Reservation in southern Utah. The site covers 235 acres and contains 69 acres of tailings and several of the original mill structures. Remedial action must be performed in accordance with standards and with the concurrence of the US Nuclear Regulatory Commission and the Navajo Nation. The proposed action is to stabilize the tailings within the present tailings site by consolidating the tailings and associated contaminated soils into a recontoured pile. A radon barrier of compacted earth would be constructed over the pile, and various erosion control measures would be taken to assure the long-term stability of the pile. The no action alternative is also assessed in this document. 240 refs., 12 figs., 20 tabs.

  1. EIS-0355: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The ... of the mill tailings at Crescent Junction, Utah, using rail transportation, and ...

  2. EIS-0185: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    9: Draft Environmental Impact Statement EIS-0129: Draft Environmental Impact Statement New England/Hydro-Quebec 450 kV Transmission Line Interconnection - Phase II EIS-0129-DEIS.pdf (3.27 MB) More Documents & Publications EIS-0129: Final Environmental Impact Statement EIS-0116: Final Environmental Impact Statement EIS-0125 Energy

    61: Final Programmatic Environmental Impact Statement EIS-0161: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits

  3. Remedial Action Plan and final design for stabilization of the inactive uranium mill tailings at Green River, Utah. Volume 1, Text, Appendices A, B, and C: Final report

    SciTech Connect (OSTI)

    Matthews, M.L.; Alkema, K.

    1991-03-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities that are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site located near Green River, Utah. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the state of Utah and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the state of Utah, and concurrence by the NRC, becomes Appendix 8 of the Cooperative Agreement.

  4. EIS-0427: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0427: Final Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona This EIS evaluates the environmental impacts of...

  5. DOE Issues Final Site-Wide Environmental Impact Statement for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site-Wide Environmental Impact Statement for the Nevada National Security Site DOE Issues Final Site-Wide Environmental Impact Statement for the Nevada National Security Site...

  6. EIS-0361: EPA Notice of Availability of the Final Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    EPA Notice of Availability of the Final Environmental Impact Statement EIS-0250-S1 and EIS-0250-S2: EPA Notice of Availability of the Draft Supplemental Environmental...

  7. EIS-0426: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0473: EPA Notice of Availability of a Final Environmental Impact Statement EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement...

  8. EIS-0404: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0407: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement...

  9. EIS-0481: EPA Notice of Availability of Final Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    of Final Environmental Impact Statement More Documents & Publications EIS-0463-S1: EPA Notice of Availability of Supplement to the Draft Environmental Impact Statement...

  10. EIS-0423: DOE Notice of Availability of the Final Environmental...

    Office of Environmental Management (EM)

    of the Final Environmental Impact Statement More Documents & Publications EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement...

  11. EIS-0419: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0419: Final Environmental Impact Statement Whistling Ridge Energy Project, Skamania County, Washington This EIS evaluates the environmental impacts of a proposal to allow the ...

  12. EIS-0460: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0460: Final Environmental Impact Statement FutureGen 2.0 Project, Morgan County, Illinois This EIS evaluates the potential environmental impacts of DOE's proposed action to ...

  13. EA-1606: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1606: Final Environmental Assessment Proposed Use of Savannah River Site Lands for Military Training, SC DOE prepared an environmental assessment to analyze the potential ...

  14. EIS-0378: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0378: Final Environmental Impact Statement Port Angeles-Juan de Fuca Transmission Project Sea Breeze Olympic Converter LP (Sea Breeze) has...

  15. EA-1115: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    EA-1115: Final Environmental Assessment Liquid Waste Treatment at the Nevada Test Site, Nye County, Nevada This EA evaluates the environmental impacts of the proposal to treat ...

  16. Final Guidance for Consideration of Environmental Justice in...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Consideration of Environmental Justice in Clean Air Act 309 Reviews (EPA, 1999) Final Guidance for Consideration of Environmental Justice in Clean Air Act 309 Reviews (EPA, 1999) ...

  17. Idaho High-Level Waste & Facilities Disposition, Final Environmental...

    Office of Environmental Management (EM)

    must prepare an Environmental Impact Statement (EIS). Copies of the Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement are available at the...

  18. EA-1338: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1338: Final Environmental Assessment Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership This EA evaluates the environmental impacts for the proposed ...

  19. EA-1651: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    EA-1651: Finding of No Significant Impact EA-1574: Final Environmental Assessment EA-1488: Environmental Assessment for the U-233 Disposition, Medical Isotope Production, and ...

  20. EIS-0288: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MB) More Documents & Publications EIS-0288: Draft Environmental Impact Statement EIS-0288-S1: Draft Supplemental Environmental Impact Statement EIS-0288-S1: Final Supplemental

  1. EA-1440-S2: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1968: Final Site-Wide Environmental Assessment EA-1887: Supplemental Environmental Assessment EA-1573-S1: Proposed Renewable Fuel Heat Plant Improvements at the National ...

  2. EIS-0414: EPA Notice of Availability of a Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0414: EPA Notice of Availability of a Final Environmental Impact Statement Energia Sierra Juarez Transmission Project EPA announces the availability of the Final...

  3. EIS-0427: EPA Notice of Availability of a Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of a Final Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona EPA announces the availability of the Final...

  4. EA-1789: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1789: Final Environmental Assessment Construction and Operation of a Proposed ... (API) to support the final design, construction, and start-up of a cellulose to ...

  5. EIS-0387: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0387: EPA Notice of Availability of the Final ... More Documents & Publications EIS-0445: EPA Notice of Availability of the Draft ...

  6. EIS-0085-S: Final Environmental Impact Statement | Department...

    Energy Savers [EERE]

    EIS-0085-S: Final Environmental Impact Statement Liquid-Metal Fast Breeder Reactor Program, Supplemental PDF icon EIS-0085-FSEIS.pdf More Documents & Publications EIS-0018: Final ...

  7. EA-1665: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Final Environmental Assessment and Finding of No Significant Impact EA-1665: Final Environmental Assessment and Finding of No Significant Impact Davis-Kingman Tap 69-kV...

  8. EIS-0375: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0375: Final Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste The U.S. Department of Energy (DOE) has prepared this Final Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (Final GTCC EIS) to evaluate the potential environmental impacts associated with the proposed development, operation, and long-term management of a disposal facility or

  9. EIS-0499: EPA Notice of Availability of Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy EPA Notice of Availability of Final Environmental Impact Statement EIS-0499: EPA Notice of Availability of Final Environmental Impact Statement Great Northern Transmission Line Project, Minnesota EPA announced the availability of the Final Environmental Impact Statement for the Great Northern Transmission Line Project. The Final EIS evaluates the potential environmental impacts of a DOE proposal to grant a Presidential permit to Minnesota Power to construct,

  10. EIS-0212: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    2: Final Environmental Impact Statement EIS-0212: Final Environmental Impact Statement Safe Interim Storage of Hanford Tank Wastes, Hanford Site, Richland, Washington This Final Environmental Impact Statement has been prepared pursuant to the National Environmental Policy Act and the Washington State Environmental Policy Act. U.S. Department of Energy and Washington State Department of Ecology have identified the need to maintain safe storage of high-level radioactive wastes currently stored in

  11. EIS-0393: EPA Notice of Availability of Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy EPA Notice of Availability of Final Environmental Impact Statement EIS-0393: EPA Notice of Availability of Final Environmental Impact Statement Montanore Project; Montana EPA announced the availability of a Final EIS prepared by USDA Forest Service (Kootenai National Forest) and the Montana Department of Environmental Quality to evaluate the potential environmental impacts of a proposed copper and silver underground mine about 18 miles south of Libby,

  12. EIS-0393: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0393: Final Environmental Impact Statement Montanore Project; Montana The USDA Forest Service (Kootenai National Forest) and the Montana Department of Environmental Quality issued a Final EIS that evaluates the potential environmental impacts of a proposed copper and silver underground mine about 18 miles south of Libby, Montana. DOE's Bonneville Power Administration, a cooperating agency, has jurisdiction over the construction of a transmission line and

  13. EIS-0459: Final Programmatic Environmental Impact Statement | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 9: Final Programmatic Environmental Impact Statement EIS-0459: Final Programmatic Environmental Impact Statement Hawaii Clean Energy Programmatic Environmental Impact Statement DOE issued a final programmatic EIS that examines the potential environmental impacts of energy efficiency activities and renewable energy technologies that could assist the State of Hawaii in meeting the goal established under the Hawaii Clean Energy Initiative to meet 70% of the State's energy needs by 2030

  14. EIS-0498: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0498: Final Environmental Impact Statement Magnolia LNG and Lake Charles Expansion Projects, Calcasieu Parish, Louisiana The Federal Energy Regulatory Commission (FERC) issued a Final EIS that analyzes the potential environmental impacts of constructing and operating the proposed Magnolia LNG Project, an on-land liquefied natural gas (LNG) terminal and associated facilities near Lake Charles, Louisiana. The EIS also analyzes the potential environmental

  15. Agencies Publish Final Environmental Impact Statement on Energy Corridor

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Designation in the West | Department of Energy Final Environmental Impact Statement on Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West November 26, 2008 - 2:07pm Addthis WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The

  16. Agencies Publish Final Environmental Impact Statement on Energy Corridor

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Designation in the West | Department of Energy Final Environmental Impact Statement on Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West November 26, 2008 - 4:58pm Addthis WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The

  17. EA-1946: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1946: Final Environmental Assessment Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon Bonneville Power Administration (BPA) issued a Final EA that assesses the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon. The Final EA consists of comments received on the draft EA and responses to the

  18. Emery County, Utah: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Clawson, Utah Cleveland, Utah Elmo, Utah Emery, Utah Ferron, Utah Green River, Utah Huntington, Utah Orangeville, Utah Retrieved from "http:en.openei.orgwindex.php?titleEmery...

  19. Wasatch County, Utah: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Green Joules Pan Am Biofuels Inc Places in Wasatch County, Utah Charleston, Utah Daniel, Utah Heber, Utah Midway, Utah Park City, Utah Timber Lakes, Utah Wallsburg, Utah...

  20. Ground water protection strategy for the Uranium Mill Tailings Site at Green River, Utah. Final, Revision 2, Version 5: Appendix E to the remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Green River, Utah

    SciTech Connect (OSTI)

    1995-09-01

    The purpose of this appendix is to provide a ground water protection strategy for the Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site at Green River, Utah. Compliance with the US Environmental Protection Agency (EPA) ground water protection standards will be achieved by applying supplemental standards (40 CFR {section} 192.22(a); 60 FR 2854) based on the limited use ground water present in the uppermost aquifer that is associated with widespread natural ambient contamination (40 CFR {section} 192.11(e); 60 FR 2854). The strategy is based on new information, including ground water quality data collected after remedial action was completed, and on a revised assessment of disposal cell design features, surface conditions, and site hydrogeology. The strategy will result in compliance with Subparts A and C of the EPA final ground water protection standards (60 FR 2854). The document contains sufficient information to support the proposed ground water protection strategy, with monitor well information and ground water quality data included as a supplement. Additional information is available in the final remedial action plan (RAP) (DOE, 1991a), the final completion report (DOE, 1991b), and the long-term surveillance plan (LTSP) (DOE, 1994a).

  1. EIS-0236-S4: Final Supplemental Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy 36-S4: Final Supplemental Programmatic Environmental Impact Statement EIS-0236-S4: Final Supplemental Programmatic Environmental Impact Statement Complex Transformation The National Nuclear Security Administration (NNSA), an agency within the Department of Energy, has the responsibility to maintain the safety, security, and reliability of the United States' nuclear weapons stockpile. This Complex Transformation Supplemental Programmatic Environmental Impact Statement

  2. Fernald Environmental Management Project Director's Final Findings...

    Office of Environmental Management (EM)

    the hazardous waste in the uranyl nitrate hexahydrate (UNH) System Parties DOE; Fernald Environmental Restoration Management Corporation (FERMCO); Ohio Environmental Protection...

  3. Fernald Environmental Management Project Director's Final Findings...

    Office of Environmental Management (EM)

    Phil Hammric U.S. Department of Energy Femald Environmental Management Project P.O. Box 389705 Cincinnati, Ohio 45239 Mr. John Bradbume Femald Environmental Restoration Corporation ...

  4. EA-2013: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-2013: Final Environmental Assessment Herbicide Application at Three Substations; Imperial County (California), Maricopa and Yuma Counties (Arizona) Western Area Power Administration (Western) and the Bureau of Land Management (BLM) jointly issued a final EA that analyzes the potential environmental impacts of Western's proposed use of selected herbicides for the treatment of undesirable vegetation within three existing substations on lands administered by BLM.

  5. EA-2022: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-2022: Final Environmental Assessment The Bureau of Reclamation, with Western Area Power Administration as a cooperating agency, issued a final EA that assesses the potential environmental impacts of a proposal to develop a 9.4 megawatt hydroelectric project at the existing Helena Valley Pumping Plant site at Canyon Ferry Dam on the Missouri River near Helena, Montana. The new hydropower generator would interconnect to Western's transmission system at an existing

  6. EIS-0447: EPA Notice of Availability Final Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy EPA Notice of Availability Final Environmental Impact Statement EIS-0447: EPA Notice of Availability Final Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York EPA announces the availability of the Champlain Hudson Power Express Transmission Line Project Final Environmental Impact Statement. Review Period Ends: 09/15/2014. EIS-0447-FEIS-EPANOA-2014.pdf (54.65 KB) More Documents & Publications EIS-0288-S1: Revision to EPA

  7. EIS-0493: FERC Notice of Availability of Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 3: FERC Notice of Availability of Final Environmental Impact Statement EIS-0493: FERC Notice of Availability of Final Environmental Impact Statement Corpus Christi LNG Terminal and Pipeline Project, Nueces and San Patricio Counties, Texas The Federal Energy Regulatory Commission (FERC) announced the availability of a Final EIS that analyzes the potential environmental impacts of a proposal to construct and operate a liquefied natural gas export and import

  8. EIS-0436: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Final Environmental Impact Statement EIS-0436: Final Environmental Impact Statement I-5 Corridor Reinforcement Project; Multnomah County, Oregon, and Cowlitz and Clark Counties, Washington DOE's Bonneville Power Administration (BPA) issued a Final EIS that evaluates the potential environmental impacts of a BPA proposal to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation near

  9. EIS-0448: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Final Environmental Impact Statement EIS-0448: Final Environmental Impact Statement Desert Sunlight Solar Farm Project, California This Plan Amendment/Final Environmental Impact Statement (PA/FEIS) addresses the possible United States Bureau of Land Management (BLM) approval of an amendment to the California Desert Conservation Area Plan (CDCA Plan) to allow for solar energy and of a right-of-way (ROW) grant to lease land managed by the BLM for construction, operation and decommissioning of a

  10. EIS-0474: EPA Notice of Availability of Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy EPA Notice of Availability of Final Environmental Impact Statement EIS-0474: EPA Notice of Availability of Final Environmental Impact Statement Southline Transmission Line Project; Arizona and New Mexico The Bureau of Land Management and Western Area Power Administration announced the availability of a final EIS that evaluates the potential environmental impacts of the proposed Southline Transmission Project and addresses associated potential land use plan

  11. EIS-0486: DOE Notice of Availability of Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy Availability of Final Environmental Impact Statement EIS-0486: DOE Notice of Availability of Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE announces the availability of a final EIS that evaluates the potential environmental impacts of DOE participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed Project would include an overhead ± 600-kilovolt

  12. EIS-0486: EPA Notice of Availability of Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy Availability of Final Environmental Impact Statement EIS-0486: EPA Notice of Availability of Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project EPA announces the availability of a final EIS that evaluates the potential environmental impacts of DOE participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed Project would include an overhead ± 600-kilovolt

  13. EIS-0486: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0486: Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE prepared this Final EIS to evaluate the potential environmental impacts of the proposed Plains & Eastern Project and alternatives to it. The proposed Project would include an overhead ± 600-kilovolt high-voltage direct current electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts primarily

  14. EIS-0491: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Final Environmental Impact Statement EIS-0491: Final Environmental Impact Statement Lake Charles Liquefaction Project; Calcasieu Parish, Louisiana Federal Energy Regulatory Commission, with DOE as a cooperating agency, issued a Final EIS that analyzes the potential environmental impacts of the Lake Charles Liquefaction Project, a proposal to expand an existing liquefied natural gas import terminal in Calcasieu Parish, Louisiana, by constructing and operating natural gas liquefaction and

  15. EIS-0496: EPA Notice of Availability of Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy EPA Notice of Availability of Final Environmental Impact Statement EIS-0496: EPA Notice of Availability of Final Environmental Impact Statement San Luis Transmission Project; Alameda, Merced, San Joaquin, and Stanislaus Counties, California EPA announced the availability of a final EIS/Environmental Impact Report, prepared by Western Area Power Administration and the San Luis & Delta-Mendota Water Authority as joint federal and state lead agencies, that

  16. EIS-0498: Notice of Availability for the Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy Notice of Availability for the Final Environmental Impact Statement EIS-0498: Notice of Availability for the Final Environmental Impact Statement Magnolia LNG and Lake Charles Expansion Projects, Calcasieu Parish, Louisiana The Federal Energy Regulatory Commission (FERC) announced the availability of a Final EIS that analyzes the potential environmental impacts of a proposal to construct and operate the Magnolia LNG Project, an on-land liquefied natural gas

  17. EIS-0499: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0499: Final Environmental Impact Statement Great Northern Transmission Line Project, Minnesota DOE prepared this Final EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Minnesota Power to construct, operate, maintain, and connect a new 883-megawatt electric transmission system across the U.S.-Canada border. The proposed 220-mile transmission line would cross the border near Roseau, Minnesota, and

  18. EIS-0503: EPA Notice of Availability of Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy EPA Notice of Availability of Final Environmental Impact Statement EIS-0503: EPA Notice of Availability of Final Environmental Impact Statement New England Clean Power Link, Vermont DOE prepared this Final EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Transmission Developers, Inc.-New England, to construct, operate, maintain, and connect a new 1000-megawatt electric transmission system across the

  19. EIS-0503: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0503: Final Environmental Impact Statement New England Clean Power Link, Vermont DOE prepared this Final EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Transmission Developers, Inc.-New England, to construct, operate, maintain, and connect a new 1000-megawatt electric transmission system across the U.S.-Canada border near Alburgh, VT. The transmission line would connect to the Vermont Electric Power

  20. EA-1875: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    875: Final Environmental Assessment EA-1875: Final Environmental Assessment Jackson Laboratory Biomass Energy Center Project, Bar Harbor, Maine The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of Federal grant funding to design, permit, and construct a Biomass Energy Center at The Jackson Laboratory (the Laboratory) in Bar Harbor, Maine. Final Environmental Assessment for the Jackson Laboratory Biomass Energy Center Project, Bar Harbor, Maine, DOE/EA-1875 (June 2011)

  1. EA-2001: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-2001: Final Environmental Assessment Energy Efficiency Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings' Baseline Standards Update (RIN 1904-AD39) Section 305(a) of the Energy Conservation and Production Act (ECPA) requires that DOE establish by rule Federal building and energy efficiency standards for all Federal commercial and multi-family high-rise residential buildings. This final EA evaluates the potential environmental

  2. EA-2043: Final Environmental Assesment | Department of Energy

    Energy Savers [EERE]

    Final Environmental Assesment EA-2043: Final Environmental Assesment EA-2043: Columbia Stock Ranch Section 536 Ecosystem Restoration Project; Columbia County, Oregon The U.S. Army Corps of Engineers issued a final EA that analyzes the potential environmental impacts of a proposed tidal floodplain ecosystem restoration project at Columbia Stock Ranch, located in Columbia County, Oregon. Bonneville Power Administration, a cooperating agency, proposes to provide funding for the project. For more

  3. EA-1483: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    3: Final Environmental Assessment EA-1483: Final Environmental Assessment Decontamination and Decommissioning of the Juggernaut Reactor at Argonne National Laboratory; East Argonne, Illinois The U.S. Department of Energy (DOE) is proposing to decontaminate and decommission the Juggernaut Reactor located at Argonne National Laboratory-East (ANL-E) in Argonne, Illinois. Final Environmental Assessment for Decontamination and Decommissioning of the Juggernaut Reactor at Argonne National Laboratory;

  4. Golden Reading Room: FINAL Environmental Impact Statements | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy FINAL Environmental Impact Statements Golden Reading Room: FINAL Environmental Impact Statements Below are electronic versions of Golden Field Office Reading Room documents that were created after November 1, 1996, per the requirements of the Electronic Freedom of Information Act Amendment of 1996. Most documents are available in Adobe Acrobat Portable Document Format (PDF). Final Environmental Impact Statement for the Proposed Abengoa Biorefinery Project, Hugoton, Stevens County,

  5. DOE Issues Final Environmental Impact Statement for Disposal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement for Disposal of Greater-Than-Class C Waste DOE Issues Final Environmental Impact Statement for Disposal of Greater-Than-Class C Waste February 25, ...

  6. EIS-0236-S4: Final Supplemental Programmatic Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    S4: Final Supplemental Programmatic Environmental Impact Statement EIS-0236-S4: Final ... EIS-0236-S4FEISsummary-2008.pdf (3.03 MB) EIS-0236-S4FEISvol1-2008.pdf (15.53 MB) ...

  7. Y-12 Final Site-Wide Environmental Impact Statement Approved...

    National Nuclear Security Administration (NNSA)

    Blog Home Field Offices Welcome to the NNSA Production Office NPO News Releases Y-12 Final Site-Wide Environmental Impact Statement Approved Y-12 Final Site-Wide...

  8. EIS-0375: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0375: EPA Notice of Availability of Final Environmental Impact Statement (192.33 KB) More Documents & Publications EIS-0288-S1: EPA Notice of Availability of Final Supplemental ...

  9. EA-1193: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1193: Final Environmental Assessment Atmospheric Radiation Measurement (ARM) Program North Slope of Alaska and Adjacent Arctic Ocean Cloud and Radiation Testbed (CART) Site The ...

  10. EIS-0374: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0374: Final Environmental Impact Statement Klondike IIIBiglow Canyon Wind Integration Project This summary covers the major points of the draft...

  11. EA-1849: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    EA-1849: Final Environmental Assessment Tuscarora Geothermal Power Plant, Elko County, ... The power production facilities include the Tuscarora Geothermal Power Plant Facility ...

  12. EIS-0407: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Final Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Kansas PDF icon EIS-0407-NOA-FEIS-2010.pdf More Documents &...

  13. EIS-0360: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    EIS-0360: Final Environmental Impact Statement Construction and Operation of a Depleted ... This site-specific EIS analyzes the construction, operation, maintenance, and ...

  14. EA-1812: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1812: Final Environmental Assessment Haxtun Wind Energy Project, Logan and Phillips ... Renewable Energy Deployment Program to Phillips County for design, permitting, and ...

  15. EIS-0125: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0125: Final Environmental Impact Statement Bonneville Power Administration Intertie Development and Use The Bonneville Power Administration developed this EIS to examine the ...

  16. EIS-0222: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0222: Final Environmental Impact Statement Hanford Comprehensive Land-Use Plan, Hanford Site, Richland, Washington The DOE has prepared this HCP EIS to evaluate the potential ...

  17. EIS-0250-S1: Final Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0250-S1: Final Supplemental Environmental Impact Statement for a Geologic Repository ... DOCUMENTS AVAILABLE FOR DOWNLOAD January 8, 2016 EIS-0203-SA-07: Supplement Analysis ...

  18. EIS-0444: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0444: EPA Notice of Availability of the Final Environmental Impact Statement Texas Clean Energy Project, Ector, Texas 2011-19917.pdf More Documents & Publications...

  19. EIS-0440: DOE Notice of Availablity of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0440: DOE Notice of Availablity of the Final Environmental Impact Statement DOE announces the availability of the Quartzsite Solar Energy Project, La Paz County, AZ FEIS. This ...

  20. EA-1499: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    EA-1499: Final Environmental Assessment RadiologicalNuclear Countermeasures Test and Evaluation Complex, Nevada Test Site The DOE, National Nuclear Security Administration Nevada ...

  1. EIS-0377: DOE Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0377: DOE Notice of Availability of the Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project The Western Area Power Administration...

  2. EIS-0421: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0421: EPA Notice of Availability of the Final Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA PDF icon...

  3. EIS-0325: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Washington. This project would increase transmission system capacity north of Hanford. Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, DOE...

  4. EA-1406: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1406: Final Environmental Assessment Ground Water Compliance at the New Rifle, ... controls and continued monitoring for the New Rifle uranium mill tailings site. ...

  5. EIS-0511: FERC Notice of Availability of FInal Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Project. For more information on this project, see the project page: http:energy.govnode1021761. Download Document EIS-0511: FERC Notice of Availability of FInal Environmental...

  6. EIS-0410: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0410: Final Environmental Impact Statement Keystone Oil Pipeline Project For more information, see the project page: http:energy.govnode304135. PDF icon ...

  7. EA-1859: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1859: Final Environmental Assessment Kirkwood Community College Wind Turbine Project ... who would use these funds to purchase equipment for one 2.5-megawatt wind turbine. ...

  8. EA-2003: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    EA-2003: Final Environmental Assessment Sandy River Delta Section 536 Ecosystem Restoration Project, Multnomah County, Oregon The U.S. Army Corps of Engineers prepared an EA that ...

  9. EIS-0323: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0323: Final Environmental Impact Statement Sacramento Area Voltage Support The Western Area Power Administration's Central Valley Project transmission...

  10. EIS-0493: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0493: Final Environmental Impact Statement Corpus Christi LNG Terminal and Pipeline Project, Nueces and San Patricio Counties, Texas The Federal Energy Regulatory...

  11. EIS-0464: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Final Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, Texas EPA...

  12. EA-1336: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1336: Final Environmental Assessment Ocean Sequestration of Carbon Dioxide Field ... evaluate the dispersion and diffusion of liquid carbon dioxide droplets in ocean waters. ...

  13. EA-1440: Final Site-Wide Environmental Assessment | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    alternative energy research. These improvements are needed to allow for growth of NREL's research programs. DOEEA-1440 Final Site-Wide Environmental Assessment of the ...

  14. EA-1740: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    project of installing and operating a CHP system, and the No-Action Alternative. Final Environmental Assessment For The Thermal Energy Corporation Combined Heat And Power Project, ...

  15. EA-1804: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the alternative of not implementing this project (the No-Action Alternative). Final Environmental Assessment for Sauk Valley Community College's Wind Energy Project, Dixon, Lee ...

  16. EA-1802: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and the alternative of not implementing this project (No-Action Alternative). Final Environmental Assessment for Chicago View Wind Project, Chicago Heights, Cook County, ...

  17. EA-1607: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    sale2 to appropriately licensed entities (the Direct Sale Alternative). DOEEA-1607: Final Environmental Assessment for Disposition of DOE Excess Depleted Uranium, Natural ...

  18. EA-0843: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-0843-FEA-19943.pdf More Documents & Publications DOE Comments - Radiation Protection (Atomic Energy Act) EIS-0290: Final Environmental Impact Statement Audit Report: IG-0454

  19. EIS-0120: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0120: Final Environmental Impact Statement Waste Management Activities for Groundwater Protection Savannah River Plant, Aiken, South Carolina The U.S. Department of Energy ...

  20. Draft Environmental Assessment for Direct Final Rule, 10 CFR...

    Broader source: Energy.gov (indexed) [DOE]

    ENVIRONMENTAL ASSESSMENT FOR Final Rule, 10 CFR Part 433, "Energy Efficiency Standards for New Federal Commercial and Multi- Family High-Rise Residential Buildings' Baseline ...

  1. EIS-0423-S1: Final Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Long-Term Management and Storage of Elemental Mercury This Final SEIS supplements the January 2011 Environmental Impact Statement for the Long-Term Management and Storage of ...

  2. Idaho High-Level Waste & Facilities Disposition, Final Environmental...

    Office of Environmental Management (EM)

    Copies of the Idaho High-Level Waste and Facilities Disposition Final Environmental Impact ... of alternatives for managing high- level waste (HLW) calcine, mixed transuranic waste...

  3. Final Environmental Impact Statement for the Tank Waste Remediation...

    Office of Environmental Management (EM)

    TITLE: Final Environmental Impact Statement for the Tank Waste Remediation System, Hanford ... related to the Hanford Site Tank Waste Remediation System (TWRS) alternatives for ...

  4. EIS-0397: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0397: Final Environmental Impact Statement Lyle Falls Fish Passage Project BPA proposes to fund modifications to the existing Lyle Falls Fishway...

  5. EA-1747: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1747: Final Environmental Assessment Surface Water Configuration Project at the Rocky ... The purpose of the Proposed Action is to reduce or eliminate the retention of surface ...

  6. EIS-0286: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0286: Final Environmental Impact Statement Hanford Site Solid (Radioactive and Hazardous) Waste Program The Hanford Site Solid (Radioactive and...

  7. EIS-0400: EPA Notice of Availability of Final Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO Final Environmental Impact Statement. EIS-0400-FEIS-EPANOA-2013.pdf More...

  8. EIS-0279: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0279: Final Environmental Impact Statement Spent Nuclear Fuel Management, Aiken, South ... including placing these materials in forms suitable for ultimate disposition. ...

  9. EA-1269: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1269: Final Environmental Assessment Decontamination and Volume Reduction System for ... The proposed process, called the decontamination and volume reduction system (DVRS), would ...

  10. EIS-0288-S1: Final Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Production of Tritium in a Commercial Light Water Reactor The Final Supplemental Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor ...

  11. EIS-0449: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Blythe Solar Power Project This Plan AmendmentFinal Environmental Impact Statement (PAFEIS) addresses the possible United States Bureau of Land Management (BLM) approval of an ...

  12. EA-1900: Notice of Availability of a Final Environmental Assessment...

    Office of Environmental Management (EM)

    EA-1900: Notice of Availability of a Final Environmental Assessment and Finding of No Significant Impact Radiological Work and Storage Building at the Knolls Atomic Power ...

  13. EIS-0400: Final Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    EIS-0400: Final Environmental Impact Statement Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO Western Area Power ...

  14. EIS-0404: Final Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    PDF icon EIS-0404-FEIS-Apps-2010.pdf More Documents & Publications EIS-0496: Final Environmental Impact Statement EIS-0157-SA-01: Supplement Analysis EIS-0496: Draft

  15. EA-1579: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    Groundwater Corrective Measures, DOEEA-1579 (February 2007) More Documents & Publications EA-1696: Final Environmental Assessment EIS-0225-SA-03: Supplement Analysis EA-1464

  16. EIS-0416: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement Ivanpah Solar Electric Generating System The Bureau of Land Management (BLM) has received a proposal from Solar Partners I, II, IV, and...

  17. EA-1897: Final Environmental Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Newberry EGS Demonstration EIS-0207: Final Environmental Impact Statement track 4: enhanced geothermal systems (EGS) | geothermal 2015 peer review...

  18. EIS-0281: Final Site-Wide Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0281: Final Site-Wide Environmental Impact Statement Sandia National LaboratoriesNew Mexico DOE proposes to continue operating the Sandia National LaboratoriesNew Mexico ...

  19. EIS-0417: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0417: Final Environmental Impact Statement South Mountain Freeway (Loop 202); Phoenix, ... impacts of a proposed new multi-lane freeway in the metropolitan Phoenix area. ...

  20. EIS-0093: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0093: Final Environmental Impact Statement Bonneville Power Administration's 1982 Rate Proposal The U.S. Department of Energy's Bonneville Power...

  1. EIS-0425: EPA Notice of Availability of a Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of a Final Environmental Impact Statement Bonneville Power Administration Mid-Columbia Coho Restoration Project, Chelan and Okanogan Counties, WA...

  2. EA-1907: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment EA-1907: Final Environmental Assessment Western Plains Energy, LLC Biogas Anaerobic Digester Facility, Oakley, Kansas For more information, contact: Ms. Melissa...

  3. EA-1356: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    EA-1356: Final Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation The U.S. Department of Energy (DOE)...

  4. EA-1573: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Director's Discretionary Research and Development Program, Annual Report FY 2007 EA-1968: Final Site-Wide Environmental Assessment EA-1573-S1: Proposed Renewable Fuel Heat Plant ...

  5. EIS-0486: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications EIS-0487: Notice of EIS Adoption EIS-0375: EPA Notice of Availability of Final Environmental Impact Statement EIS-0288-S1: EPA Notice of Availability ...

  6. Magnolia LNG and Lake Charles Expansion Projects Final Environmental...

    Office of Environmental Management (EM)

    Energy Regulatory Commission Office of Energy Projects Washington, DC 20426 Magnolia LNG and Lake Charles Expansion Projects Final Environmental Impact Statement Magnolia LNG, LLC ...

  7. EIS-0487: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0487: Final Environmental Impact Statement Freeport LNG Liquefaction Project, Brazoria ... the Freeport Liquefied Natural Gas (LNG) Liquefaction Project, which would expand ...

  8. EA-1927: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    EA-1927: Final Environmental Assessment Paducah Gaseous Diffusion Plant Potential Land and ... the Paducah Gaseous Diffusion Plant from DOE to other entities for economic development. ...

  9. EIS-0456: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydroelectric Project (FERC No. 0456) Notice of Availability for the Final Environmental Impact Statement for the Cushman Hydroelectric Project (FERC No. 0456), Design and...

  10. EA-2024: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-2024: Final Environmental Assessment Gap Material Plutonium - Transport, Receipt, and Processing The U.S. Department of Energy, National Nuclear Security Administration, has prepared this environmental assessment to evaluate the potential environmental impacts associated with transporting up to 900 kilograms of plutonium from foreign nations to the United States, storing the plutonium at the Savannah River Site in South Carolina, and processing it for

  11. EIS-0158: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Supplemental Environmental Impact Statement to the 1979 Petroleum Production at Maximum Efficient Rate, Naval Petroleum Reserve No. 1(Elk Hills), Kern County, California

  12. EIS-0375: EPA Notice of Availability of Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy EPA Notice of Availability of Final Environmental Impact Statement EIS-0375: EPA Notice of Availability of Final Environmental Impact Statement Disposal of Greater-than-Class-C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste The U.S. Environmental Protection Agency announces the availability of the Final Environmental Impact Statement (EIS) for the Disposal of Greater-Than-Class C Low-Level Radioactive Waste and GTCC-Like Waste (DOE/EIS-0375). Document

  13. EIS-0355: DOE Notice of Availability of the Final Environmental...

    Office of Environmental Management (EM)

    Junction, Utah, using rail transportation, and implementation of active ground water remediation at the Moab site. Remediation of the Moab Uranium Mill Tailings, Grand and ...

  14. EA-1792-S1: Final Supplemental Environmental Assessment | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy -S1: Final Supplemental Environmental Assessment EA-1792-S1: Final Supplemental Environmental Assessment DOE's Golden Field Office has prepared this supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine, Maine. This test would be conducted prior

  15. EA-1900: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1900: Final Environmental Assessment Radiological Work and Storage Building at the Knolls Atomic Power Laboratory Kesselring Site, West Milton, New York This EA evaluates the potential environmental impacts of constructing and operating a new Radiological Work and Storage Building at the Knolls Atomic Power Laboratory Kesselring Site. A modernized radiological Work and Storage Building would streamline radioactive material handling and storage operations, permit

  16. EA-1949: FERC Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1949: FERC Final Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA On September 16, 2010, Snohomish PUD was selected for potential receipt of financial assistance from the U.S. Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy to support the design, construction, deployment and monitoring phases of their project. To satisfy DOE's requirements under the National Environmental Policy Act (NEPA) for this

  17. EIS-0203: Programmatic Final Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy Programmatic Final Environmental Impact Statement EIS-0203: Programmatic Final Environmental Impact Statement Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs This EIS considers programmatic (DOE-wide) alternative approaches to safely, efficiently, and responsibly manage existing and projected quantities of spent nuclear fuel until the year 2035. This amount of time may be required to make and implement a

  18. EIS-0413: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0413: Final Environmental Impact Statement The Department of the Interior's Bureau of Land Management, with DOE's Western Area Power Administration (WAPA) as a cooperating agency, prepared this EIS to evaluate the environmental impacts of a proposal to construct and operate 156 wind turbine generators and related facilities on public lands surrounding the town of Searchlight, Nevada. The proposal includes a substation that would be operated by WAPA.

  19. EIS-0472: EPA Notice of Availability of Final Programmatic Environmental

    Office of Environmental Management (EM)

    0: Final Environmental Impact Statement EIS-0460: Final Environmental Impact Statement FutureGen 2.0 Project, Morgan County, Illinois This EIS evaluates the potential environmental impacts of DOE's proposed action to provide approximately $1 billion in cost-shared American Recovery and Reinvestment Act funding to the FutureGen Industrial Alliance, Inc. (Alliance) to support the planning, design, construction, and operation of a prototype power plant, including the capture, conveyance, and

  20. EA-1903: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    03: Final Environmental Assessment EA-1903: Final Environmental Assessment Kansas State University Zond Wind Energy Project, Manhattan, Kansas This EA evaluates the potential environmental impacts of a proposal to use Congressional Directed funds to develop the Great Plains Wind Energy Consortium aimed at increasing the penetration of wind energy via distributed wind power generation throughout the region. EA-1903-FEA-2014.pdf (14.29 MB) More Documents & Publications EA-1903: Draft

  1. EA-2004: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-2004: Final Environmental Assessment The Seneca Nation Wind Turbine Project, Cattaraugus Territory, Erie County, New York The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of federal funding to the Seneca Nation of Indians, to design, permit, and construct up to a 2.0-megawatt wind turbine on Tribal common lands in the Cattaraugus Territory, New York. The turbine would be located near Lucky Lane and Gil Lay Arena. An Environmental

  2. EA-0978: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    3: Final Environmental Assessment EA-0843: Final Environmental Assessment Idaho National Engineering Laboratory Low-Level and Mixed Waste Processing This EA evaluates the environmental impacts of a proposal to (1) reduce the volume of the U.S. Department of Energy's Idaho National Engineering Laboratory's (INEL) generated low-level waste (LLW) through sizing, compaction, and stabilization at Waste Experimental Reduction Facility (WERF); and (2) use commercial offsite facilities for supplemental

  3. EA-1172: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    72: Final Environmental Assessment EA-1172: Final Environmental Assessment Sale of Surplus Natural and Low Enriched Uranium This EA evaluates the environmental impacts for the proposal to sell uranium for subsequent enrichment and fabrication into commercial nuclear power reactor fuel. The uranium is currently stored at the U.S. Department of Energy Portsmouth gaseous diffusion plant in Portsmouth, Ohio, and the Paducah gaseous diffusion plant in Paducah, Kentucky. EA-1172-FEA-1996.pdf (509.29

  4. EA-1339: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    12: Final Environmental Assessment EA-1312: Final Environmental Assessment Ground Water Compliance at the Grand Junction UMTRA Project Site (Climax Uranium Millsite) This document is the Environmental Assessment (EA) for the proposed action to address ground water contamination at the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This site is also known as the former Climax uranium millsite. The purpose of this EA is to present the proposed action and

  5. EA-1340: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    40: Final Environmental Assessment EA-1340: Final Environmental Assessment Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site This EA evaluates the environmental impacts for the proposal to make maximum use of existing U.S. Department of Energy Waste Isolation Pilot Plant (WIPP) facilities to further the scientific missions assigned to the Department of Congress to the extent it can do so without impacting the primary mission of WIPP, the disposal of defense transuranic

  6. EA-1386: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    1: Final Environmental Assessment EA-1381: Final Environmental Assessment Atlas Relocation and Operation at the Nevada Test Site The National Nuclear Secuxity Administration (NNSA) prepared an Environmental Assessment (EA) (DOEIEA-1381) to analyze the proposed action to relocate the Atlas pulse power machine from Los Alamos National Laboratory (LANL) to the Nevada Test Site (NTS). At the NTS, Atlas would be reassembled in a newly constructed building within a designated Industrial, Research, and

  7. EA-2006: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-2006: Final Environmental Assessment Columbia Estuary Ecosystem Restoration Program Bonneville Power Administration, with the U.S. Army Corps of Engineers as a cooperating agency, issued a final programmatic EA for actions recommended by the Northwest Power and Conservation Council to help restore ecological structure, function, and biodiversity within the Columbia River estuary. Activities under this program could include full reconnection of tidal influence

  8. EIS-0488: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    88: Final Environmental Impact Statement EIS-0488: Final Environmental Impact Statement The Federal Energy Regulatory Commission (FERC) issued a final EIS for a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export LNG. DOE, a cooperating agency, adopted the

  9. Milford, Utah FORGE Logo | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Logo Milford, Utah FORGE Logo Milford, Utah FORGE Logo More Documents & Publications Milford, Utah FORGE Logo Milford, Utah FORGE Map Milford, Utah FORGE Logo West Flank FORGE Logo ...

  10. Milford, Utah FORGE Map | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Milford, Utah FORGE Map More Documents & Publications Milford, Utah FORGE Map Milford, Utah FORGE Logo Milford, Utah FORGE Map Newberry FORGE Map Milford, Utah FORGE Map Fallon ...

  11. Final Complex Transformation Supplemental Programmatic Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... S.1.4.1 Scoping Process The Council on Environmental Quality (CEQ) NEPA regulations require "an early and ... Air Force Base, the U.S. Navy's China Lake testing and training range, ...

  12. Fernald Environmental Management Project Director's Final Findings...

    Office of Environmental Management (EM)

    644-2329 December 27. 1994 Re: U.S. Department of Energy Fernald Environmental Management Project Attn: Jack Craig, Acting Site Manager P.O. Box 389705 Cincinnati, Ohio 45239 ...

  13. Klickitat Cogeneration Project : Final Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  14. Boise geothermal injection well: Final environmental assessment

    SciTech Connect (OSTI)

    1997-12-31

    The City of Boise, Idaho, an Idaho Municipal Corporation, is proposing to construct a well with which to inject spent geothermal water from its hot water heating system back into the geothermal aquifer. Because of a cooperative agreement between the City and the US Department of Energy to design and construct the proposed well, compliance to the National Environmental Policy Act (NEPA) is required. Therefore, this Environmental Assessment (EA) represents the analysis of the proposed project required under NEPA. The intent of this EA is to: (1) briefly describe historical uses of the Boise Geothermal Aquifer; (2) discuss the underlying reason for the proposed action; (3) describe alternatives considered, including the No Action Alternative and the Preferred Alternative; and (4) present potential environmental impacts of the proposed action and the analysis of those impacts as they apply to the respective alternatives.

  15. EIS-0375: DOE Notice of Availability of Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 5: DOE Notice of Availability of Final Environmental Impact Statement EIS-0375: DOE Notice of Availability of Final Environmental Impact Statement Disposal of Greater-than-Class-C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste The U.S. Department of Energy (DOE) announces the availability of its Final Environmental Impact Statement (EIS) for the Disposal of Greater-Than-Class C Low-Level Radioactive Waste and GTCC-Like Waste (DOE/EIS-0375), prepared

  16. DOE Issues Final Environmental Impact Statement for Disposal of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Greater-Than-Class C Waste | Department of Energy Environmental Impact Statement for Disposal of Greater-Than-Class C Waste DOE Issues Final Environmental Impact Statement for Disposal of Greater-Than-Class C Waste February 25, 2016 - 3:30pm Addthis WASHINGTON, D.C. - The U.S. Department of Energy (DOE) today issued a Final Environmental Impact Statement (EIS) that evaluates the potential environmental impacts associated with the proposed development, operation, and long-term management of

  17. Final Supplemental Environmental Impact Statement for a Geologic Repository

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor DOE/EIS-0250F-S2 and Final En | Department of Energy Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor DOE/EIS-0250F-S2 and Final En Final Supplemental Environmental Impact

  18. EA-2002: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-2002: Final Environmental Assessment Right-of-Way Application for the Tucson-Apache ... tribal land along the existing Tucson-Apache Transmission Line to replace the previous ...

  19. EA-1915: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Land at the Hanford Site, Richland, Washington The final EA assesses the potential environmental effects of conveying approximately 1,641 acres of Hanford Site land to the ...

  20. Environmental Assessment for Final Rule 10 CFR 433

    Office of Energy Efficiency and Renewable Energy (EERE)

    Document details the U.S. Department of Energy's environmental assessment for the Final Rule 10 CFR Part 433, Energy Efficiency Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings.

  1. EIS-0162: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0162: Final Environmental Impact Statement Bonneville Power Administration (BPA) Resource Programs EIS-0162-FEIS-Summary.pdf (1.54 MB) EIS-0162-FEIS-Volume1.pdf (8.99 MB) ...

  2. EIS-0164: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0164: Final Environmental Impact Statement Pacific Gas TransmissionPacific Gas and Electric and Altamont Natural Gas Pipeline Project PDF icon EIS-0164-FEIS.pdf PDF icon ...

  3. NNSS Final Site-Wide Environmental Impact Statement (SWEIS) ...

    National Nuclear Security Administration (NNSA)

    the Final Site-Wide Environmental Impact Statement for the Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada was published. ...

  4. EA-1301: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1301: Final Environmental Assessment Idaho Department of Fish and Game Captive Rearing ... have had far-reaching effects on many species of fish and wildlife within the basin. ...

  5. EIS-0342: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    icon EIS-0342-FEIS-2004.pdf PDF icon EIS-0342-FEIS-App-2004.pdf PDF icon EIS-0342-FEIS-Figures-2004.pdf More Documents & Publications EIS-0330: Final Environmental Impact Statement...

  6. EIS-0129: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0129: Final Environmental Impact Statement New EnglandHydro-Quebec 450 kV Transmission Line Interconnection - Phase II PDF icon EIS-0129-FEIS.pdf PDF icon ...

  7. EIS-0283-S2: Final Supplemental Environmental Impact Statement...

    Broader source: Energy.gov (indexed) [DOE]

    Statement This Final SEIS evaluates the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which a disposition...

  8. EA-1941: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BPA issued a Final EA to assess the potential environmental impacts of proposed improvements to 13 miles of access roads for its existing 115-kV Boyer-Tillamook No. 1 Transmission ...

  9. EIS-0251: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada | Department of Energy 50-S1: Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada EIS-0250-S1: Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level

  10. EIS-0459: EPA Notice of Availability of Final Programmatic Environmental

    Office of Environmental Management (EM)

    CA | Department of Energy 8: First Solar Topaz Solar Farm Project in San Luis Obispo County, CA EIS-0458: First Solar Topaz Solar Farm Project in San Luis Obispo County, CA Documents Available for Download August 12, 2011 EIS-0458: Final Environmental Impact Statement Proposed Loan Guarantee to Support Construction and Startup of the Topaz Solar Farm, San Luis Obispo County, CA August 12, 2011 EIS-0458: DOE Notice of Availability of the Final Environmental Impact Statement Proposed Loan

  11. EA-1655: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    5: Final Environmental Assessment EA-1655: Final Environmental Assessment Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development The Proposed Action would create and operate an experimental facility for further advancing the development of laser-driven, plasma-based, particle beam accelerators. An existing, approximately 7,000-square-foot, accelerator laboratory area inside Building 71 at Lawrence Berkeley National Laboratory (LBNL) would be

  12. EIS-0244: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    3: Final Environmental Impact Statement EIS-0243: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  13. EA-1761: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    61: Final Environmental Assessment EA-1761: Final Environmental Assessment Clemson University Wind Turbine Drivetrain Test Facility Clemson University is proposing to construct and operate a Wind Turbine Drivetrain Test Facility (DTTF) at the Clemson University Research Institute in North Charleston, South Carolina. This project would promote industry/government/university collaboration in research and workforce education and would be manned with a dedicated workforce to service industry needs

  14. EA-1985: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1985: Final Environmental Assessment Virginia Offshore Wind Technology Advancement Project on the Atlantic Outer Continental Shelf Offshore Virginia DOE is proposing to fund Virginia Electric and Power Company's Virginia Offshore Wind Technology Advancement Project (VOWTAP). The proposed VOWTAP project consists of design, construction and operation of a 12 megawatt offshore wind facility located approximately 24 nautical miles off the coast of Virginia Beach, VA

  15. EA-2017: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-2017: Final Environmental Assessment Braddock Locks and Dam Hydro Electric Project The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of federal funding to Hydro Green Energy, LLC to fabricate, install, and operate one interchangeable Modular Bulb Turbine (MBT) which would be inserted in a Large Frame Module (LFM) at the existing Braddock Locks and Dam. The installation would be part of a larger project that would include the design

  16. RAPID/Geothermal/Environment/Utah | Open Energy Information

    Open Energy Info (EERE)

    may make modifications to the final permit based on any comments submitted during review. Air Quality Assessment Process In Utah, developers may be required to obtain an Air...

  17. DOE Issues Finding of No Significant Impact and Final Environmental

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessment on Road Project U.S. DEPARTMENT OF ENERGY IDAHO FALLS, IDAHO, 83403 News Media Contact: Tim Jackson (208) 526-8484 For Immediate Release Thursday August 12, 2010 DOE Issues Finding of No Significant Impact and Final Environmental Assessment on Road Project The U.S. Department of Energy has issued a Finding of No Significant Impact stemming from an environmental assessment it performed to examine the potential environmental impacts of building an internal road to safely ship

  18. Final Uranium Leasing Program Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (PEIS) | Department of Energy Uranium Leasing Program Programmatic Environmental Impact Statement (PEIS) Final Uranium Leasing Program Programmatic Environmental Impact Statement (PEIS) Uranium Leasing Program-Mesa, Montrose, and San Miguel Counties, Colorado EIS-0472 evaluated the environmental impacts of management alternatives for DOE's Uranium Leasing Program, under which DOE administers tracts of land in western Colorado for exploration, development, and the extraction of uranium and

  19. Issuance of the Final Tank Closure and Waste Management Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy Issuance of the Final Tank Closure and Waste Management Environmental Impact Statement Issuance of the Final Tank Closure and Waste Management Environmental Impact Statement December 5, 2012 - 12:00pm Addthis Media Contacts Carrie Meyer, DOE (509) 376-0810 Carrie_C_Meyer@orp.doe.gov Erika Holmes, Ecology (509) 372-7880 Erika.Holmes@ecy.wa.gov Richland, WA - The U.S. Department of Energy (DOE) is issuing its Final Tank Closure and Waste Management

  20. EIS-0493: Notice of Adoption of Final Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Adoption of Final Environmental Impact Statement EIS-0493: Notice of Adoption of Final Environmental Impact Statement EPA issued a notice of DOE's adoption of a FERC EIS for a liquefied natural gas export and import terminal on the north shore of Corpus Christi Bay in Nueces and San Patricio Counties, Texas. DOE, Office of Fossil Energy, was a cooperating agency. Document Download Notice of Adoption of Final EIS (171.36 KB) More Documents & Publications EIS-0447: EPA

  1. Cache County, Utah: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Climate Zone Number 6 Climate Zone Subtype B. Places in Cache County, Utah Amalga, Utah Avon, Utah Benson, Utah Cache, Utah Clarkston, Utah Cornish, Utah Cove, Utah Hyde Park, Utah...

  2. Sundance Energy Project Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2001-06-29

    Sundance Energy LLC (Sundance) has applied to the Western Area Power Administration (Western) to interconnect a planned generator facility to Western's transmission system in the vicinity of Coolidge, Arizona. Western's proposed action is to enter into an interconnection and construction agreement with Sundance for the requested interconnection. The proposed interconnection would integrate the power generated by the Sundance Energy Project (Project) into the regional transmission grid and would allow Sundance to supply its power to the competitive electric wholesale market. The proposed Project would be built on private lands southwest of Coolidge. The proposed Project would be a ''peaking power plant project'' which means it would provide energy when it is needed during peak demand periods in the region. The proposed Project would also be a ''merchant plant'' which means it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the energy generated by the power plant. Western, as a major transmission system owner, must generally provide access to its transmission system when requested by an eligible organization per existing policies, regulations and laws. The proposed Project would consist of the construction and operation of a generating facility; construction of a 14-mile pipeline to supply natural gas to the proposed Facility; a new 230-kV bay at an existing substation; a new double-circuit 230-kV transmission line; a new single-circuit 230-kV transmission line; an upgrade of a 115-kV line to 230-kV specifications; and an upgrade of an existing substation. Three alternatives would consist of different locations of the 230-kV transmission lines and would not involve upgrading the 115-kV line or the existing substation. The environmentally preferred alternative is Alternative 3, the power line routing that is furthest west.

  3. Griffith Energy Project Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  4. EA-1774-S1: Final Environmental Assessment and Finding of No...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4-S1: Final Environmental Assessment and Finding of No Significant Impact EA-1774-S1: Final Environmental Assessment and Finding of No Significant Impact Energy Conservation ...

  5. Final Land Configuration for the Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Stegen, R. L.; Kapinos, J. M.; Wehner, J. P.; Snyder, B.; Davis, R. W.

    2006-07-01

    Closure of the Rocky Flats Environmental Technology Site (RFETS) has been completed. The future land use of the site is designated as a National Wildlife Refuge. A joint effort between Kaiser-Hill, Department of Energy, U.S. Fish and Wildlife Service, Environmental Protection Agency, State of Colorado, and other stakeholders was initiated to provide direction for developing the final land configuration. Through early identification of issues and developing mutually agreeable solutions, the final land configuration of the site was successfully completed. (authors)

  6. EA-1726: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1726: Final Environmental Assessment Loan Guarantee to Kahuku Wind Power, LLC for Construction of the Kahuku Wind Power Facility in Kahuku, O'ahu, Hawai'i DOE's proposed action is to issue a $117 million loan guarantee to Kahuku Wind Power LLC to support construction of the Kahuku Wind Power facility. The proposed facility would consist of 12 Clipper LibertyTM 2.5-MW WTGs, an operations and maintenance (O&M) building, one permanent unguyed meteorological

  7. Lake Charles Liquefaction Project Final Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lake Charles Liquefaction Project Final Environmental Impact Statement Trunkline Gas Company, LLC, Lake Charles LNG Company, LLC, and Lake Charles LNG Export Company, LLC FERC Docket Nos. CP14-119-000, CP14-120-000, and CP14-122-000 DOE Docket Nos. 11-59-LNG and 13-04-LNG FERC/EIS-0258F, DOE/EIS-0491 Cooperating Agencies: U.S. Coast Guard U.S. Department of Energy U.S. Department of Transportation Lake Charles Liquefaction Project Final Environmental Impact Statement FERC/EIS-0258F Docket Nos.

  8. EA-1870: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    70: Draft Environmental Assessment EA-1870: Draft Environmental Assessment Utah Coal and Biomass Fueled Pilot Plant Kanab, Utah The U.S. Department of Energy (DOE) prepared this...

  9. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final

    SciTech Connect (OSTI)

    1999-02-01

    This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield were determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.

  10. EA-1634: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    13: Finding of No Significant Impact EA-1613: Finding of No Significant Impact Proposed High Explosive Pressing Facility Pantex Plant, Amarillo, Texas The proposed action is to construct a new facility that would consolidate the Pantex Plant's current high explosive pressing activities at one facility. Finding of No Significant Impact High Explosive Pressing Facility (1.76 MB) More Documents & Publications EA-1613: Final Environmental Assessment EA-1533: Finding of No Significant Impact

  11. Utah Heavy Oil Program

    SciTech Connect (OSTI)

    J. Bauman; S. Burian; M. Deo; E. Eddings; R. Gani; R. Goel; C.K. Huang; M. Hogue; R. Keiter; L. Li; J. Ruple; T. Ring; P. Rose; M. Skliar; P.J. Smith; J.P. Spinti; P. Tiwari; J. Wilkey; K. Uchitel

    2009-10-20

    The Utah Heavy Oil Program (UHOP) was established in June 2006 to provide multidisciplinary research support to federal and state constituents for addressing the wide-ranging issues surrounding the creation of an industry for unconventional oil production in the United States. Additionally, UHOP was to serve as an on-going source of unbiased information to the nation surrounding technical, economic, legal and environmental aspects of developing heavy oil, oil sands, and oil shale resources. UHOP fulGilled its role by completing three tasks. First, in response to the Energy Policy Act of 2005 Section 369(p), UHOP published an update report to the 1987 technical and economic assessment of domestic heavy oil resources that was prepared by the Interstate Oil and Gas Compact Commission. The UHOP report, entitled 'A Technical, Economic, and Legal Assessment of North American Heavy Oil, Oil Sands, and Oil Shale Resources' was published in electronic and hard copy form in October 2007. Second, UHOP developed of a comprehensive, publicly accessible online repository of unconventional oil resources in North America based on the DSpace software platform. An interactive map was also developed as a source of geospatial information and as a means to interact with the repository from a geospatial setting. All documents uploaded to the repository are fully searchable by author, title, and keywords. Third, UHOP sponsored Give research projects related to unconventional fuels development. Two projects looked at issues associated with oil shale production, including oil shale pyrolysis kinetics, resource heterogeneity, and reservoir simulation. One project evaluated in situ production from Utah oil sands. Another project focused on water availability and produced water treatments. The last project considered commercial oil shale leasing from a policy, environmental, and economic perspective.

  12. Glen Canyon National Recreation Area, Lake Powell, Utah | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Glen Canyon National Recreation Area, Lake Powell, Utah Glen Canyon National Recreation Area, Lake Powell, Utah Photo of the Photovoltaic System at Lake Powell, Utah Lake Powell is part of Utah's Glen Canyon National Recreation Area. The Dangling Rope Marina used diesel generators to supply power. They used 65,000 gallons of diesel fuel per year that had to be barged in over Lake Powell. The potential for environmental damage to the marina in the event of a fuel spill was significant,

  13. An Examination of Avoided Costs in Utah

    SciTech Connect (OSTI)

    Bolinger, Mark; Wiser, Ryan

    2005-01-07

    The Utah Wind Working Group (UWWG) believes there are currently opportunities to encourage wind power development in the state by seeking changes to the avoided cost tariff paid to qualifying facilities (QFs). These opportunities have arisen as a result of a recent renegotiation of Pacificorp's Schedule 37 tariff for wind QFs under 3 MW, as well as an ongoing examination of Pacificorp's Schedule 38 tariff for wind QFs larger than 3 MW. It is expected that decisions made regarding Schedule 38 will also impact Schedule 37. Through the Laboratory Technical Assistance Program (Lab TAP), the UWWG has requested (through the Utah Energy Office) that LBNL provide technical assistance in determining whether an alternative method of calculating avoided costs that has been officially adopted in Idaho would lead to higher QF payments in Utah, and to discuss the pros and cons of this method relative to the methodology recently adopted under Schedule 37 in Utah. To accomplish this scope of work, I begin by summarizing the current method of calculating avoided costs in Utah (per Schedule 37) and Idaho (the ''surrogate avoided resource'' or SAR method). I then compare the two methods both qualitatively and quantitatively. Next I present Pacificorp's four main objections to the use of the SAR method, and discuss the reasonableness of each objection. Finally, I conclude with a few other potential considerations that might add value to wind QFs in Utah.

  14. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Mexican Hat, Utah: Appendix E. Final report

    SciTech Connect (OSTI)

    1988-07-01

    This document provides Appendix E of the Remedial Action Plan (RAP) presented in 1988 for the stabilization of the inactive uranium mill tailings at the Mexican Hat, Utah site. The RAP was developed to serve a two- fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley, Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. The RAP has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action.

  15. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    SciTech Connect (OSTI)

    1999-02-01

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  16. Final environmental impact statement. Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Not Available

    1980-10-01

    This volume contains the appendices for the Final Environmental Impact Statement for the Waste Isolation Pilot Plant (WIPP). Alternative geologic environs are considered. Salt, crystalline rock, argillaceous rock, and tuff are discussed. Studies on alternate geologic regions for the siting of WIPP are reviewed. President Carter's message to Congress on the management of radioactive wastes and the findings and recommendations of the interagency review group on nuclear waste management are included. Selection criteria for the WIPP site including geologic, hydrologic, tectonic, physicochemical compatability, and socio-economic factors are presented. A description of the waste types and the waste processing procedures are given. Methods used to calculate radiation doses from radionuclide releases during operation are presented. A complete description of the Los Medanos site, including archaeological and historic aspects is included. Environmental monitoring programs and long-term safety analysis program are described. (DMC)

  17. Juab County, Utah: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    169-2006 Climate Zone Number 5 Climate Zone Subtype B. Places in Juab County, Utah Eureka, Utah Levan, Utah Mona, Utah Nephi, Utah Rocky Ridge, Utah Santaquin, Utah Retrieved...

  18. New England Clean Power Link Project Final Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Credits 1. TDI-NE (http://wamc/files/styles/default/public/201410/new-england-clean-power-link-map-ctsy- tdi-new-england.jpg" alt="">) 2. NECPL exit from Lake Champlain (Benson, Vermont) courtesy of TDI-NE 3. Lake Bomoseen, Fair Haven, Vermont courtesy of TDI-NE 4. TDI-NE 2014a 1 3 2 4 FINAL NEW ENGLAND CLEAN POWER LINK PROJECT ENVIRONMENTAL IMPACT STATEMENT DOE/EIS-0503 VOLUME II: APPENDICES U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY

  19. Final Complex Transformation Supplemental Programmatic Environmental Impact Statement October 2008

    Office of Environmental Management (EM)

    I Volume I Chapters 1 - 4 Chapters 1 - 4 DOE/EIS-0236-S4 National Nuclear Security Administration U.S. Department of Energy October 2008 C C CO O OM MP PL LE EXtransfo o or r rm m mat on COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy, National Nuclear Security Administration TITLE: Final Complex Transformation Supplemental Programmatic Environmental Impact Statement (Complex Transformation SPEIS, DOE/EIS-0236-S4) CONTACTS: For further information on this SPEIS, For general information

  20. Environmental Assessment for Final Rule, 10 CFR 43

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    "Energy Efficiency Standards for New Federal Commercial and High-Rise Multi-Family Residential Buildings" and 10 CFR 435, "Energy Efficiency Standards for New Federal Residential Low-Rise Residential Buildings" Baseline Standards Update (DOE/EA-1871) March 16, 2011 2 Environmental Assessment for Final Rule, 10 CFR 433, "Energy Efficiency Standards for New Federal Commercial and High-Rise Multi-Family Residential Buildings" and 10 CFR 435, "Energy Efficiency

  1. EA-1440-S1: Final Supplement to the Site-Wide Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1440-S1: Final Supplement to the Site-Wide Environmental Assessment EA-1440-S1: Final Supplement to the Site-Wide Environmental Assessment National Renewable Energy Laboratory's...

  2. C-340 Complex D&D Final Lessons Learned (Post CD-4), Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    C-340 Complex D&D Final Lessons Learned (Post CD-4), Environmental Management Cleanup, Sep 2011 C-340 Complex D&D Final Lessons Learned (Post CD-4), Environmental Management ...

  3. EIS-0423-S1: EPA Notice of Availability of Final Supplemental Environmental

    Office of Environmental Management (EM)

    Impact Statement | Department of Energy Final Supplemental Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of Final Supplemental Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury EPA announces the availability of the Final Supplemental Environmental Impact Statement for Long-Term Management and Storage of Elemental Mercury. Download Document EIS-0423-S1: EPA Notice of Availability of Final Supplemental Environmental Impact Statement

  4. EIS-0423: DOE Notice of Availability of the Final Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy Final Environmental Impact Statement EIS-0423: DOE Notice of Availability of the Final Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury Download Document EIS-0423: DOE Notice of Availability of the Final Environmental Impact Statement (56.31 KB) More Documents & Publications EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423: EPA Notice of Availability of the Final

  5. Utah Department of Commerce | Open Energy Information

    Open Energy Info (EERE)

    Commerce Jump to: navigation, search Name: Utah Department of Commerce Address: 160 East 300 South Place: Salt Lake City, Utah Zip: 84111 References: Utah Commerce Website1 This...

  6. Blue Creek Winter Range : Wildlife Mitigation Project : Final Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; United States. Bureau of Indian Affairs; Spokane Tribe of the Spokane Reservation, Washington

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir.

  7. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  8. Summary Final Long-Term Management and Storage of Elemental Mercury Supplemental Environmental Impact Statement

    Office of Environmental Management (EM)

    Environmental Impact Statement Final LONG-TERM MANAGEMENT AND STORAGE OF ELEMENTAL MERCURY Final Supplemental Environmental Impact Statement LONG-TERM MANAGEMENT AND STORAGE OF ELEMENTAL MERCURY DOE/EIS-0423-S1 September 2013 SUMMARY AND GUIDE FOR STAKEHOLDERS U.S. Department of Energy Office of Environmental Management Washington, DC AVAILABILITY OF THIS FINAL LONG-TERM MANAGEMENT AND STORAGE OF ELEMENTAL MERCURY SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT For additional information on this

  9. BLM Utah State Office | Open Energy Information

    Open Energy Info (EERE)

    Utah State Office Jump to: navigation, search Logo: BLM Utah State Office Name: BLM Utah State Office Abbreviation: Utah Address: 440 West 200 South, Suite 500 Place: Salt Lake...

  10. Utah_cm_smith

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cindy and Mack Smith Site - Utah Wind Anemometer Loan Program Latitude: N. 37 deg. 44.034' Longitude: W. 109 deg. 17.28' Elevation: 6762' Placed in service: November 21, 2002...

  11. Field Projects: Monticello, Utah

    Broader source: Energy.gov [DOE]

    A permeable reactive barrier (PRB) of zero-valent iron is helping to clean up groundwater at a former uranium and vanadium ore processing mill at Monticello, Utah. LM managed remediation of...

  12. DOE - Office of Legacy Management -- Utah

    Office of Legacy Management (LM)

    Utah Utah ut_map Green River Site Mexican Hat Site Monticello Site Salt Lake City Sites (2)

  13. 2006 Long Range Development Plan Final Environmental ImpactReport

    SciTech Connect (OSTI)

    Philliber, Jeff

    2007-01-22

    This environmental impact report (EIR) has been prepared pursuant to the applicable provisions of the California Environmental Quality Act (CEQA) and its implementing guidelines (CEQA Guidelines), and the Amended University of California Procedures for Implementation of the California Environmental Quality Act (UC CEQA Procedures). The University of California (UC or the University) is the lead agency for this EIR, which examines the overall effects of implementation of the proposed 2006 Long Range Development Plan (LRDP; also referred to herein as the 'project' for purposes of CEQA) for Lawrence Berkeley National Laboratory (LBNL; also referred to as 'Berkeley Lab,' 'the Laboratory,' or 'the Lab' in this document). An LRDP is a land use plan that guides overall development of a site. The Lab serves as a special research campus operated by the University employees, but it is owned and financed by the federal government and as such it is distinct from the UC-owned Berkeley Campus. As a campus operated by the University of California, the Laboratory is required to prepare an EIR for an LRDP when one is prepared or updated pursuant to Public Resources Code Section 21080.09. The adoption of an LRDP does not constitute a commitment to, or final decision to implement, any specific project, construction schedule, or funding priority. Rather, the proposed 2006 LRDP describes an entire development program of approximately 980,000 gross square feet of new research and support space construction and 320,000 gross square feet of demolition of existing facilities, for a total of approximately 660,000 gross square feet of net new occupiable space for the site through 2025. Specific projects will undergo CEQA review at the time proposed to determine what, if any, additional review is necessary prior to approval. As described in Section 1.4.2, below, and in Chapter 3 of this EIR (the Project Description), the size of the project has been reduced since the Notice of Preparation for

  14. Utah Geothermal Area | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Utah Geothermal Area Utah Geothermal Area Utah has two geothermal electric plants: the 23-megawatt Roosevelt Hot Springs facility near Milford run by Utah Power and CalEnergy Corp., and the Utah Municipal Power Association's Cove Fort Station, which is located north of Beaver, Utah. Photo of the Bud L. Bonnett Geothermal Plant in Cove Fort Sulphurdale, UT

  15. EA-1312: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    Environmental Protection Agency' (EPA's) "Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings" (Title 40, Code of Federal Regulations, Part 192). ...

  16. EIS-0370: EPA Notice of Availability of the Final Environmental...

    Energy Savers [EERE]

    EIS-0440: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0350-S1: EPA Notice of Availability of the Draft Supplemental Environmental Impact Statement...

  17. EIS-0460: EPA Notice of Availability of Final Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    EIS-0447: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental...

  18. EIS-0370: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0440: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0350-S1: EPA Notice of Availability of the Draft Supplemental Environmental...

  19. FINAL ENVIRONMENTAL ASSESSMENT FOR A COMBINED POWER AND BIOMASS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA Environmental Assessment EFH Essential Fish Habitat EO Executive Order F Degrees ... Environmental Protection Agency USFWS U.S. Fish and Wildlife Service gm 3 microgram per ...

  20. EIS-0393: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Montana Department of Environmental Quality to evaluate the potential environmental impacts of a proposed copper and silver underground mine about 18 miles south of Libby, Montana. ...

  1. DOE/EA-1494 Final Environmental Assessment for Activities Using

    National Nuclear Security Administration (NNSA)

    ... 1993. Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements ("Green Book"), U.S. Department of Energy, Office of NEPA Oversight. ...

  2. Environmental assessment of advanced thin film manufacturing process. Final report

    SciTech Connect (OSTI)

    Cunningham, D.W.; Mopas, E.; Skinner, D.; McGuire, L.; Strehlow, M.

    1998-09-01

    This report describes work performed by BP Solar, Inc., to provide an extensive preproduction analysis of waste-stream abatement at its plant in Fairfield, California. During the study, numerous technologies were thoroughly evaluated, which allowed BP Solar to select systems that outperformed the stringent federal and state regulations. The main issues were originally perceived to be controlling cadmium compound releases to both air and wastewater to acceptable levels and adopting technologies for air and water waste streams in an efficient, cost-effective manner. BP Solar proposed high-efficiency, reliable control equipment that would reduce air-contaminant emission levels below levels of concern. Cadmium telluride dust is successfully controlled with high-efficiency (>99.9%) bag-in/bag-out filters. For air abatement, carbon canisters provide efficient VOC reduction, and wastewater pretreatment is required per federal pretreatment standards. BP Solar installed a cadmium-scavenging ion exchange system and electrowinning system capable of removing cadmium to <10 ppb (local publicly-owned-treatment-works limits for cadmium is 30 ppb). BP Solar plans to maximize potential reuse of rinse waters by phasing in additional wastewater treatment technologies. Finally, the work to date has identified the areas that need to be revisited as production scales up to ensure that all health, safety, and environmental goals are met.

  3. EIS-0361: EPA Notice of Availability of the Final Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy 1: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0361: EPA Notice of Availability of the Final Environmental Impact Statement Western Greenbrier Co-Production Demonstration Project Notices of Availability Western Greenbrier Co-Production Demonstration Project Final Environmental Impact Statement DOE/EIS-0361 (72FR63579) (11/09/07) (47.94 KB) More Documents & Publications EIS-0361: EPA Notice of Availability of the Draft

  4. EIS-0387: EPA Notice of Availability of the Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy Final Environmental Impact Statement EIS-0387: EPA Notice of Availability of the Final Environmental Impact Statement Y-12 National Security Complex Project, Oak Ridge, Tennessee Notice of Availability of the Final Environmental Impact Statement: Y-12 National Security Complex Project, to Support the Stockpile Stewardship Program and to Meet the Mission Assigned to Y-12, Oak Ridge, Tennessee (DOE/EIS-0387)(03/04/2011)(76FR12109) (34.64 KB) More Documents

  5. EIS-0423: EPA Notice of Availability of the Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy : EPA Notice of Availability of the Final Environmental Impact Statement EIS-0423: EPA Notice of Availability of the Final Environmental Impact Statement Long -Term Management and Storage of Elemental Mercury Storage Project, Designate a Facility or Facilities for Mercy Storage, Seven Alternative Sites, Colorado, Idaho, Missouri, Nevada, South Carolina, and Washington Download Document EIS-0423: EPA Notice of Availability of the Final Environmental Impact

  6. EIS-0474: BLM-WAPA Notice of Availability of Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy BLM-WAPA Notice of Availability of Final Environmental Impact Statement EIS-0474: BLM-WAPA Notice of Availability of Final Environmental Impact Statement Southline Transmission Line Project; Arizona and New Mexico The Bureau of Land Management and Western Area Power Administration announced the availability of a final EIS that evaluates the potential environmental impacts of the proposed Southline Transmission Project and addresses associated potential land

  7. EA-0387: DOE Notice of Availability of the Final Site-Wide Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy 387: DOE Notice of Availability of the Final Site-Wide Environmental Impact Statement EA-0387: DOE Notice of Availability of the Final Site-Wide Environmental Impact Statement Y-12 National Security Complex, Oak Ridge, TN The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the Department of Energy (DOE), announces the availability of the Final Site-Wide Environmental Impact Statement for the Y-12 National Security

  8. EIS-0288-S1: EPA Notice of Availability of Final Supplemental Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy EPA Notice of Availability of Final Supplemental Environmental Impact Statement EIS-0288-S1: EPA Notice of Availability of Final Supplemental Environmental Impact Statement Production of Tritium in a Commercial Light Water Reactor EPA announces the availability of the Production of Tritium in a Commercial Light Water Reactor (CLWR) Final Supplemental Environmental Impact Statement. For more information: http://energy.gov/node/299827.

  9. EIS-0488: Notice of Adoption of FERC Final Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Adoption of FERC Final Environmental Impact Statement EIS-0488: Notice of Adoption of FERC Final Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana EPA announces the Department of Energy's adoption of the Federal Energy Regulatory Commission's Cameron Liquefaction Project, Cameron Parish, Louisiana Final Environmental Impact Statement. EIS-0488-FEIS-DOEAdoption-2014.pdf (54.65 KB) More Documents & Publications EIS-0447: EPA Notice

  10. Beaver County, Utah: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Facility Blundell 2 Geothermal Facility Places in Beaver County, Utah Beaver, Utah Milford, Utah Minersville, Utah Retrieved from "http:en.openei.orgwindex.php?titleBeaver...

  11. Washington County, Utah: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Number 3 Climate Zone Subtype B. Registered Energy Companies in Washington County, Utah Verdi Energy Group Places in Washington County, Utah Apple Valley, Utah Enterprise, Utah...

  12. Y-12 Final Site-Wide Environmental Impact Statement Approved | National

    National Nuclear Security Administration (NNSA)

    Nuclear Security Administration | (NNSA) Final Site-Wide Environmental Impact Statement Approved March 02, 2011 Microsoft Office document icon NR-03-2

  13. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix T (Second Continued Volume): Comments & Responses.

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1995-11-01

    This is Appendix T (second continued volume) giving public comments and responses to the final environmental impact statement for the Columbia River System.

  14. Implementation of Executive Order 12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline (DOE, 1981)

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energy hereby adopts final Departmental guidelines implementing Executive Order 12114-Environmental Effecrs Abroad of Major Federal Actions, whic was issued on January 4, 1979.

  15. U.S. DEPARTMENT OF ENERGY Central Nevada Test Area ENVIRONMENTAL MANAGEMENT END STATE VISION Final

    Office of Legacy Management (LM)

    Central Nevada Test Area Environmental Management End State Vision - January 2005 DOE/NV--954 U.S. DEPARTMENT OF ENERGY Central Nevada Test Area ENVIRONMENTAL MANAGEMENT END STATE VISION Final Final - Central Nevada Test Area Environmental Management End State Vision - January 2005 Executive Summary The Environmental Management End State Vision is to be used as the primary tool for communicating the individual site end state to the involved parties (e.g., U.S. Department of Energy [DOE],

  16. U.S. DEPARTMENT OF ENERGY Project Shoal Site ENVIRONMENTAL MANAGEMENT END STATE VISION Final

    Office of Legacy Management (LM)

    Project Shoal Site Environmental Management End State Vision - January 2005 DOE/NV--955 U.S. DEPARTMENT OF ENERGY Project Shoal Site ENVIRONMENTAL MANAGEMENT END STATE VISION Final Final - Project Shoal Site Environmental Management End State Vision - January 2005 Executive Summary The Environmental Management End State Vision is to be used as the primary tool for communicating the individual site end state to the involved parties (e.g., U.S. Department of Energy [DOE], regulators, public

  17. U.S. DEPARTMENT OF ENERGY Rulison Site ENVIRONMENTAL MANAGEMENT END STATE VISION Final

    Office of Legacy Management (LM)

    Rulison Site Environmental Management End State Vision - January 2005 DOE/NV--950 U.S. DEPARTMENT OF ENERGY Rulison Site ENVIRONMENTAL MANAGEMENT END STATE VISION Final Final - Rulison Site Environmental Management End State Vision - January 2005 Executive Summary The Environmental Management End State Vision is to be used as the primary tool for communicating the individual site end state to the involved parties (e.g., U.S. Department of Energy [DOE], regulators, public stakeholders, Tribal

  18. EIS-0226: DOE Notice of Availability of the Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy (referred to as the Final Decommissioning and/or Long-Term Stewardship EIS or ''Final EIS''). DOE/EIS-0226, Notice of Availability of the Final Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center, 75 FR 4803 (January 2010) (46.73 KB) More Documents & Publications EIS-0226: DOE Notice of Availability of the Final Environmental Impact Statement

  19. Final Supplemental Environmental Impact Statement for a Geologic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor DOEEIS-0250F-S2 and Final En Final Supplemental ...

  20. EIS-0158-S2: Final Supplemental Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Program Environmental Impact Report for the Sale of the Naval Petroleum Reserve No. 1 at Elk Hills, California

  1. EA-1914: Final Site-Wide Environmental Assessment

    Broader source: Energy.gov [DOE]

    National Renewable Energy Laboratory (NREL) National Wind Technology Center (NWTC) Site-Wide Environmental Assessment, Golden, Colorado

  2. EA-1968: Final Site-Wide Environmental Assessment

    Broader source: Energy.gov [DOE]

    National Renewable Energy Laboratory (NREL) South Table Mountain (STM) Campus Site-Wide Environmental Assessment, Golden, Colorado

  3. EA-1870: Utah Coal and Biomass Fueled Pilot Plant, Kanab, Kane County, Utah

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy prepared an Environmental Assessment to evaluate the potential impacts of providing financial assistance to Viresco Energy, LLC, for its construction and operation of a Coal and Biomass Fueled Pilot Plant, which would be located in Kanab, Utah.

  4. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Mexican Hat, Utah: Text, Appendices A--C. Final report

    SciTech Connect (OSTI)

    1988-07-01

    This Remedial Action Plan (RAP) has been developed to serve a two- fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action. Pertinent information and data are included with reference given to the supporting documents. Appendices A,B, and C are provided as part of this document. Appendix A presents regulatory compliance issues, Appendix B provides details of the engineering design, and Appendix C presents the radiological support plan.

  5. Increased oil production and reserves utilizing secondary/tertiary recovery techniques on small reservoirs in the Paradox basin, Utah. Final technical progress report, October 1--December 31, 1995

    SciTech Connect (OSTI)

    Allison, M.L.

    1996-01-15

    The primary objective of this project is to enhance domestic petroleum production by demonstration and technology transfer of an advanced oil recovery technology in the Paradox basin, southeastern Utah. If this project can demonstrate technical and economic feasibility, the technique can be applied to approximately 100 additional small fields in the Paradox basin alone, and result in increased recovery of 150 to 200 million barrels of oil. This project is designed to characterize five shallow-shelf carbonate reservoirs in the Pennsylvanian (Desmoinesian) Paradox Formation and choose the best candidate for a pilot demonstration project for either a waterflood or carbon dioxide-(CO{sub 2}) flood project. The field demonstration, monitoring of field performance, and associated validation activities will take place in the Paradox basin within the Navajo Nation. The results of this project will be transferred to industry and other researchers through a petroleum extension service, creation of digital databases for distribution, technical workshops and seminars, field trips, technical presentations at national and regional professional meeting, and publication in newsletters and various technical or trade journals. Five activities continued this quarter as part of the geological and reservoir characterization of carbonate mound buildups in the Paradox basin: (1) regional facies evaluation, (2) evaluation of outcrop analogues, (3) field-scale geologic analysis, (4) reservoir analysis, and (5) technology transfer.

  6. Study of alternatives for future operations of the naval petroleum and oil shale reserves, NOSR-2, Uintah and Carbon Counties, Utah. Final report

    SciTech Connect (OSTI)

    1996-12-01

    The US Department of Energy (DOE) has asked Gustavson Associates, Inc. to serve as an Independent Petroleum Consultant and authorized a study and recommendations regarding future development of Naval Oil Shale Reserve No. 2 (NOSR-2) in Uintah and Carbon Counties, Utah. The US owns 100% of the mineral rights and about 60% of the surface rights in NOSR-2. The Ute Indian Tribe owns the other 40% of the surface. This 88,890-acre tract was set aside as an oil shale reserve for the US Navy by an Executive Order of President Wilson in 1916. Management of NOSR-2 is the responsibility of DOE. No drilling for oil and gas has occurred on the property and no production has been established. No reserves are present, although the area is hypothesized to overlay gas resources. Mapping by the US Geological Survey and others has resulted in speculative seismic leads for structures that may or may not hold conventional oil and gas. All of the mineral rights (including oil shale) must be considered exploratory and the mineral rights must be valued accordingly. The opinion recommended to maximize value to the US is Option 4, sale of the interest of the US of all or part of NOSR-2. Evaluation of this option results in an estimated value which is more than three times greater than the next highest estimated value, for Option 2, transfer to the Department of the Interior for leasing.

  7. Final Environmental Impact Statement Safe Interim Storage Of Hanford Tank Wastes

    Office of Environmental Management (EM)

    Summary-1995.html[6/27/2011 12:58:00 PM] FINAL ENVIRONMENTAL IMPACT STATEMENT SAFE INTERIM STORAGE OF HANFORD TANK WASTES SUMMARY The Safe Interim Storage of Hanford Tank Wastes Environmental Impact Statement has been prepared according to requirements of the National Environmental Policy Act and the Washington State Environmental Policy Act. In accordance with these Acts, a Draft Environmental Impact Statement was issued on August 5, 1994, (DOE 1994) and it was revised in response to public,

  8. EIS-0418: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Statement and Notice of Public Hearing | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing EIS-0414: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing Energia Sierra Juarez Transmission Project The Department of Energy (DOE) announces the availability of the ''Draft Environmental Impact Statement for the Energia Sierra Juarez U.S. Transmission Line Project'' for public

  9. DOE Issues Finding of No Significant Impact and Final Environmental

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Issues Final RFP for Portsmouth Support Services DOE Issues Final RFP for Portsmouth Support Services December 16, 2014 - 11:03am Addthis The Department of Energy yesterday released a final request for proposals for infrastructure support services at the Portsmouth Gaseous Diffusion Plant that will be set aside for small businesses. This comes after the release of a draft RFP in early July. "A firm-fixed-price, labor hour, cost reimbursement, and indefinite delivery/indefinite quantity

  10. EIS-0506: EPA Notice of Availability of Final Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    agency - that evaluates the potential environmental impacts of a proposal to improve fish habitat by restoring stream and floodplain functions, restoring instream fish habitat...

  11. EA-1321: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    Proposed Upgrade and Improvement of The National Synchrotron Light Source Complex at Brookhaven National Laboratory, Upton, New York This EA evaluates the environmental impacts for ...

  12. EA-1650: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The staff of the Federal Energy Regulatory Commission (FERC or Commission) and the Department of Energy (DOE), Office of Fossil Fuels, have prepared an environmental assessment ...

  13. EIS-0319: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    TA-18 Relocation EIS evaluates the potential direct, indirect, and cumulative environmental impacts associated with this proposed action at the following DOE sites: (1) a different...

  14. EIS-0485: EPA Notice of Availability of Final Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    the potential environmental impacts of interconnecting the proposed Grande Prairie Wind Farm (Holt County, Nebraska) to Western Area Power Administration's power...

  15. EA-2014: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    DOE orders, is survivable and sustainable for 72 hours, and achieves the U.S. Green Building Council's Leadership in Energy and Environmental Design (LEED) Gold Certification. ...

  16. EIS-0005: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    in the Pacific Northwest Power Supply System, Including Its Participation in the Hydro-Thermal Power Program: A Program Environmental Statement and Planning Report"" (The...

  17. EA-1709: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    Compact Power, Inc. Electric Drive Vehicle Battery and Component Manufacturing Initiative ... Environmental Assessment for Compact Power, Inc. Electric Drive Vehicle Battery and ...

  18. EA-1663: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory (BNL) and compares the potential impacts to the No Action Alternative. Environmental Assessment For Bp Solar Array Project Brookhaven National Laboratory Upton, New ...

  19. EA-1037: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    Uranium Lease Management Program This EA evaluates the environmental impacts of the U.S. Department of Energy's Grand Junction Projects Office's proposal to maintain and preserve ...

  20. EA-1947: Final Environmental Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    the potential environmental impacts of partial andor complete demolition of some KCP structures. EA-1947-FEA-2013.pdf (4.72 MB) More Documents & Publications EA-1947: Draft

  1. EA-1969: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    environmental effects of a proposal to restore wetland and riparian (riverbank) habitat and to reduce erosion in the Clark Fork River delta located in Bonner County, Idaho. ...

  2. Final Site-Wide Environmental Assessment of National Renewable...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    environmental and energy security benefits likely to result from expanding the domestic and worldwide use of wind energy by fostering a world- class, domestic wind industry. ...

  3. EIS-0372: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    (BHE) Northeast Reliability Interconnect This Comment-Response Addendum presents the comments (and associated responses) received on the Draft Environmental Impact Statement for...

  4. EIS-0365: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    of Findings EIS-0365: Notice of Intent to Prepare an Environmental Impact Statement and to Conduct Public Scoping Meetings and Notice of Floodplain and Wetlands Involvement...

  5. EA-1451: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    The purpose of the USEC Gas Centrifuge R&D Project is to develop an economically attractive gas centrifuge machine and process using DOE's centrifuge technology. Environmental ...

  6. Final Environmental Impact Statement for the Tank Waste Remediation...

    Office of Environmental Management (EM)

    DOE is the Federal agency responsible for waste management and environmental restoration ... disposal of Tank Waste Remediation System (TWRS) radioactive, hazardous, and mixed waste. ...

  7. Idaho High-Level Waste & Facilities Disposition, Final Environmental...

    Office of Environmental Management (EM)

    Abstract: This EIS analyzes the potential environmental consequences of alternatives for managing high- level waste (HLW) calcine, mixed transuranic wastesodium bearing waste ...

  8. EIS-0435: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement Groton Generation Station Interconnection Agreement, Brown County, South Dakota PDF icon DOE%20EIS%2004352.pdf More Documents & Publications...

  9. EA-1093: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Surface Water Drainage System This EA evaluates the environmental impacts of the proposal to correct deficiencies in, and then to maintain, the surface water drainage system ...

  10. EIS-0220: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    EIS is for DOE to manage the existing SRS nuclear materials in a safe and environmentally ... KB) DOEEIS-0220, Savannah River Site, Interim Management of Nuclear Materials (1996)

  11. EIS-0220: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    is for DOE to manage the existing SRS nuclear materials in a safe and environmentally sound ... DOEEIS-0220, Savannah River Site, Interim Management of Nuclear Materials, 1995 ...

  12. EA-1904: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Linac Coherent Light Source II at Stanford Linear Accelerator Laboratory, San Mateo, CA This EA evaluates the environmental impacts of the proposed construction of the Linac ...

  13. EA-1574: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    EA-1488: Finding of No Significant Impact EA-1488: Environmental Assessment for the U-233 Disposition, Medical Isotope Production, and Building 3019 Complex Shutdown at the Oak ...

  14. DOE/EA-1494 Final Environmental Assessment for Activities Using

    National Nuclear Security Administration (NNSA)

    ... of Conservation and Natural Resources, Division of Environmental Protection, Bureau of Air Pollution Control (BAPC) administers the Clean Air Act within the state of Nevada. ...

  15. EIS-0189: Final Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    This document analyzes the potential environmental consequences related to the Hanford Site Tank Waste Remediation System (TWRS) alternatives for management and disposal of ...

  16. EIS-0426: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    Environmental Impact Statement for the Continued Operation of the Department of EnergyNational Nuclear Security ... for continued management and operation of the ...

  17. EIS-0440: EPA Notice of Availability of a Final Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    This EIS evaluates the environmental impacts of interconnecting a proposed 100-megawatt concentrating solar power plant to Western's Bouse-Kofa 161-kilovolt transmission line. ...

  18. EIS-0226: DOE Notice of Availability of the Final Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    of the Revised Draft Environmental Impact Statement Probabilistic Modeling and Phase 2 Decision Making at the West Valley Demonstration Project and the Western New York Nuclear...

  19. EA-1966: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    facility south of Hebron in Morton and Stark Counties, North Dakota. PDF icon EA-1966-FEA-2014.pdf More Documents & Publications EA-1966: Draft Environmental Assessment EA-1902:...

  20. EIS-0496: EPA Notice of Availability of Final Environmental Impact...

    Office of Environmental Management (EM)

    San Luis Transmission Project; Alameda, Merced, San Joaquin, and Stanislaus Counties, California EPA announced the availability of a final EISEnvironmental Impact Report, prepared ...

  1. Final Environmental Impact Statement for Construction and Operation...

    Office of Environmental Management (EM)

    ... released to the environ- ment following an accident. ... DUF 6 Conversion Final EIS combustion of fossil fuels. ... season, and plant species tolerant of such conditions ...

  2. EIS-0287: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    This EIS also analyzes alternatives for the final disposition of HLW management facilities at the INEEL after their missions are completed. After considering comments on the Draft ...

  3. EIS-0413: EPA Notice of Availability of a Final Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Searchlight Wind Energy Project Final EIS. The Department of the Interior's Bureau of Land Management, with DOE's Western Area Power Administration as a cooperating agency,...

  4. EIS-0450: BLM and WAPA Notice of Availability of a Final Environmental...

    Office of Environmental Management (EM)

    TransWest Express Transmission Project; Wyoming, Colorado, Utah, and Nevada The Bureau of Land Management and Western Area Power Administration, as joint lead agencies,...

  5. EIS-0440: EPA Notice of Availability of a Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 0: EPA Notice of Availability of a Final Environmental Impact Statement EIS-0440: EPA Notice of Availability of a Final Environmental Impact Statement Quartzsite Solar Energy Project, La Paz County, AZ EPA announces the availability of the Quartzsite Solar Energy Project, La Paz County, AZ FEIS. This EIS evaluates the environmental impacts of interconnecting a proposed 100-megawatt concentrating solar power plant to Western's Bouse-Kofa 161-kilovolt

  6. EIS-0468: EPA Notice of Availability of the Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 8: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0468: EPA Notice of Availability of the Final Environmental Impact Statement American Centrifuge Plant, Piketon, OH EIS No. 20110153, Final EIS, DOE, OH, ADOPTION-American Centrifuge Plant, Gas Centrifuge Uranium Enrichment Facility, Construction, Operation, and Decommission, License Issuance, Piketon, OH, Review Period Ends: 06/20/2011, Contact: Mathew McMillen 202-586-7248. U.S.

  7. Microsoft Word - Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FOR IMMEDIATE RELEASE: Jill Moran, BLM (202) 452-5068 Wednesday, November 26, 2008 Bethany Shively, DOE (202) 586-4940 Joe Walsh, USFS (202) 205-1134 Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The Department of

  8. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Not Available

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  9. Environmental-performance research priorities: Wood products. Final report

    SciTech Connect (OSTI)

    1998-01-15

    This report describes a research plan to establish environmental, energy, and economic performance measures for renewable building materials, and to identify management and technology alternatives to improve environmental performance in a cost-effective manner. The research plan is designed to: (1) collect environmental and economic data on all life-cycle stages of the materials, (2) ensure that the data follows consistent definitions and collection procedures, and (3) develop analytical procedures for life-cycle analysis to address environmental performance questions. The research will be subdivided into a number of individual project modules. The five processing stages of wood used to organize the research plan are: (1) resource management and harvesting; (2) processing; (3) design and construction of structures; (4) use, maintenance, and disposal; and (5) waste recycling. Individual research module descriptions are provided in the report, as well as assessment techniques, research standards and protocol, and research management. 13 refs., 5 figs., 3 tabs.

  10. EA-0531: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    Program for Naval Oil Shale Reserves Nos. 1 and 3 This EA evaluates the environmental impacts of a proposal for a Natural Gas Protection Program for Naval Oil Shale Reserves Nos. ...

  11. EA-1212: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lease of Land for the Development of a Research Park at Los Alamos National Laboratory This EA evaluates the environmental impacts for the proposal to lease undeveloped land that ...

  12. EA-1871: Final Environmental Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    This EA evaluates the potential environmental impacts of revising the Federal building energy efficiency standars to ASHRAE 90.1-2007 and IECC 2009. EA-1871-FEA-2011.pdf (295.14 ...

  13. EA-1948: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE's Western Area Power Administration prepared an EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines ...

  14. Final Site-Wide Environmental Assessment of the National Renewable...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... document NREL prepared for the STM site in 1993. DOE defines a Site-Wide environmental ... of National Fire Protection Association (NFPA) 13 for an Ordinary Hazard, Group 2 area. ...

  15. Final Environmental Assessment of Ground Water Compliance at...

    Office of Environmental Management (EM)

    458 Environmental Assessment of Ground Water Compliance at the Slick Rock, Colorado, UMTRA ... DE-AC13-02GJ79491 DOE Grand Junction Office EA of Ground Water Compliance at the Slick ...

  16. EA-1147: Final Environmental Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Low Energy Demonstration Accelerator Tech Area 53 This EA evaluates the environmental impacts that would be expected to occur if the Department of Energy were to design, build, and...

  17. Final Technical Report of Institute for Environmental Genomics...

    Office of Scientific and Technical Information (OSTI)

    Project Title: Integrated Genome-Based Studies of Shewanella Ecophysiology Contract Number: DE-FG02-07ER64383 PI: Jizhong Zhou, Professor and Director, Institute for Environmental ...

  18. EA-1931: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    PDF icon EA-1931-FEA-2014.pdf More Documents & Publications EA-1931: Draft Environmental Assessment EA-1931: Finding of No Significant Impact and Mitigation Action Plan EIS-0285-SA...

  19. Environmental impacts of proposed Monitored Retrievable Storage. Final report

    SciTech Connect (OSTI)

    Not Available

    1985-12-17

    This report describes environmental impacts from a proposed monitored retrievable storage facility for spent fuels to be located in Tennessee. Areas investigated include: water supply, ground water, air quality, solid waste management, and health hazards. (CBS)

  20. EA-1814: Final Environmental Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    deliver heat to a complex of both State-owned and City-owned municipal buildings and schools. This EA analyzes the foreseeable environmental impacts of the proposed project and...

  1. EIS-0473: EPA Notice of Availability of a Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0473-FEIS-EPANOA-2013.pdf (194.56 KB) More Documents & Publications EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement ...

  2. Draft Environmental Assessment for Direct Final Rule, 10 CFR...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Regulations CH 4 methane CO 2 carbon dioxide CO carbon monoxide CSAPR Cross-State Air Pollution Rule D.C. District of Columbia DOE Department of Energy EA environmental ...

  3. Agencies Publish Final Environmental Impact Statement on Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... To review the Final PEIS and related documents, including detailed maps, visit the project Website at http:corridoreis.anl.gov. Review copies are also available at libraries and ...

  4. EIS-0511: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement Aguirre Offshore GasPort Project, Puerto Rico FERC issued a Final EIS with 10 cooperating agencies, including DOE, for the proposed Aguirre Offshore GasPort Project. ...

  5. EA-1983: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of an associated pipeline system. DOE, a cooperating agency, adopted FERC's EA as a Final DOE EA. PDF icon EA-1983-FEA-2015.pdf More Documents & Publications EA-1983: Draft...

  6. EA-1913: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary EA will not be reprinted and will serve as the Final EA. PDF icon EA-1913-FEA-2012.pdf PDF icon EA-1913-FEA-RevisionSheet-2012.pdf More Documents & Publications...

  7. EA-1942: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    with the public interest. DOE adopted FERC's EA as DOE's Final EA. PDF icon EA-1942-FEA-2014.pdf More Documents & Publications Order 3331-A: Dominion Cove Point LNG, LP - Dk....

  8. EA-1849-S1: Final Supplemental Environmental Assessment | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    . PDF icon EA-1849-S1-2014.pdf More Documents & Publications EA-1849-S-1: FONSI and Final Tuscarora Phase II Generating Facility, Elko County, NV EA-1849-S-1: Draft...

  9. EIS-0156: Cowlitz Falls Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission prepared this statement to assess the environmental impacts of constructing and operating a proposed 70-megawatt hydroelectric dam and electrical infrastructure on the Cowlitz River near Morton and Randle, Washington. The U.S. Department of Energy's Bonneville Power Administration adopted this statement on 12/6/1990 to fulfil its National Environmental Policy Act requirement for its proposed action to acquire the power output from the Cowlitz Falls Hydroelectric Project.

  10. EIS-0121: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    EIS Distribution (DOE, 2006) EIS Distribution (DOE, 2006) This DOE guidance presents a series of recommendations related to the EIS distribution process, which includes creating and updating a distribution list, distributing an EIS, and filing an EIS with the EPA. Download Document EIS Distribution (727.89 KB) More Documents & Publications Historical - Submitting Environmental Impact Statements (EPA, 2011) EIS-0511: EPA Notice of Availability of Draft Environmental Impact Statement

  11. Environmental implications of increased biomass energy use. Final report

    SciTech Connect (OSTI)

    Miles, T.R. Sr.; Miles, T.R. Jr.

    1992-03-01

    This study reviews the environmental implications of continued and increased use of biomass for energy to determine what concerns have been and need to be addressed and to establish some guidelines for developing future resources and technologies. Although renewable biomass energy is perceived as environmentally desirable compared with fossil fuels, the environmental impact of increased biomass use needs to be identified and recognized. Industries and utilities evaluating the potential to convert biomass to heat, electricity, and transportation fuels must consider whether the resource is reliable and abundant, and whether biomass production and conversion is environmentally preferred. A broad range of studies and events in the United States were reviewed to assess the inventory of forest, agricultural, and urban biomass fuels; characterize biomass fuel types, their occurrence, and their suitability; describe regulatory and environmental effects on the availability and use of biomass for energy; and identify areas for further study. The following sections address resource, environmental, and policy needs. Several specific actions are recommended for utilities, nonutility power generators, and public agencies.

  12. Utah + workshop + GRR | OpenEI Community

    Open Energy Info (EERE)

    2012 - 14:45 Utah Meeting 1 Utah + workshop + GRR On Thursday, September 6, we met in Salt Lake City with Utah state agencies to review geothermal permitting flowcharts developed...

  13. Draper, Utah: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Map This article is a stub. You can help OpenEI by expanding it. Draper is a city in Salt Lake County and Utah County, Utah. It falls under Utah's 2nd congressional...

  14. Utah Geological Survey | Open Energy Information

    Open Energy Info (EERE)

    Logo: Utah Geological Survey Name: Utah Geological Survey Address: 1594 W. North Temple Place: Salt Lake City, Utah Zip: 84114-6100 Phone Number: 801.537.3300 Website:...

  15. Utah's Public Notice Website | Open Energy Information

    Open Energy Info (EERE)

    Not Provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Utah's Public Notice Website Citation Utah.gov. Utah's Public Notice Website...

  16. EIS-0473: EPA Notice of Availability of a Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy EPA Notice of Availability of a Final Environmental Impact Statement EIS-0473: EPA Notice of Availability of a Final Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX EPA Notice of Availability of the W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX Final Environmental Impact Statement. EIS-0473-FEIS-EPANOA-2013.pdf (194.56 KB) More

  17. EIS-0470: EPA Notice of Adoption of the Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 0: EPA Notice of Adoption of the Final Environmental Impact Statement EIS-0470: EPA Notice of Adoption of the Final Environmental Impact Statement Cape Wind Energy Project in Nantucket Sound, Massachusetts The Environmental Protection Agency's Notice, dated December 26, 2012, of DOE's adoption of the U.S. Department of the Interior's final EIS was published in the Federal Register on December 31, 2012. EIS-0470-FEIS-EPA-NOA-2012.pdf (192.06 KB) More Documents

  18. NEPA and CEQA: Integrating State and Federal Environmental Reviews (Final)

    Office of Energy Efficiency and Renewable Energy (EERE)

    CEQ and the California Governor’s Office of Planning and Research (OPR) have jointly prepared the handbook “NEPA and CEQA: Integrating Federal and State Environmental Reviews.” The handbook provides practitioners with an overview of NEPA and CEQA as well as suggestions for developing a single environmental review process that can meet the requirements of both statutes. The handbook also provides a framework for a Memorandum of Understanding (MOU) between two or more agencies entering into a joint NEPA/ CEQA review process, and addresses the California Energy Commission licensing process, which takes the place of the CEQA process for certain power plants

  19. Final Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement Richland, Washington

    Office of Environmental Management (EM)

    Final FY 2009 NEUP RD Awards (2).xls Final FY 2009 NEUP RD Awards (2).xls Final FY 2009 NEUP RD Awards (2).xls (32.32 KB) More Documents & Publications NEET Awards for FY2012 Meeting Materials: June 9, 2009 EA-1775: Final Environmental Assessment of Energy

    Guidance for Effective Use of Programmatic NEPA Review Final Guidance for Effective Use of Programmatic NEPA Review On December 18, 2014, CEQ published final guidance that provides clarification on when and how Federal agencies can

  20. University of Utah | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    University of Utah University of Utah FORGE logos 010416-06.jpg The Milford, Utah FORGE team, led by the University of Utah - Energy & Geoscience Institute (EGI), has identified a location where they propose to establish a geothermal laboratory. The proposed area has an established history of geothermal research and development, with a vast set of data from exploration wells and seismic stations that will help the Milford, Utah FORGE team characterize their potential site. The Milford, Utah

  1. Final Environmental assessment for the Uranium Lease Management Program

    SciTech Connect (OSTI)

    1995-07-01

    The US Department of Energy (DOE) has prepared a programmatic environmental assessment (EA) of the proposed action to continue leasing withdrawn lands and DOE-owned patented claims for the exploration and production of uranium and vanadium ores. The Domestic Uranium Program regulation, codified at Title 10, Part 760.1, of the US Code of Federal Regulations (CFR), gives DOE the flexibility to continue leasing these lands under the Uranium Lease Management Program (ULMP) if the agency determines that it is in its best interest to do so. A key element in determining what is in DOE`s ``best interest`` is the assessment of the environmental impacts that may be attributable to lease tract operations and associated activities. On the basis of the information and analyses presented in the EA for the ULMP, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined in the National Environmental Policy Act (NEPA) of 1969 (42 United States Code 4321 et seq.), as amended.Therefore, preparation of an environmental impact statement is not required for the ULMP,and DOE is issuing this Finding, of No Significant Impact (FONSI).

  2. Utah Municipal Power Agency | Open Energy Information

    Open Energy Info (EERE)

    Municipal Power Agency Place: Utah Phone Number: (801) 798-7489 Website: www.umpa.cc Facebook: https:www.facebook.compagesUtah-Municipal-Power-Agency152219714819535 Outage...

  3. Utah/Wind Resources | Open Energy Information

    Open Energy Info (EERE)

    UtahWind Resources < Utah Jump to: navigation, search Print PDF Print Full Version WIND ENERGY STAKEHOLDER ENGAGEMENT & OUTREACHSmall Wind Guidebook OpenEI Home >> Wind >>...

  4. Orem, Utah: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Utah's 3rd congressional district.12 Registered Energy Companies in Orem, Utah Better Biodiesel Domestic Energy Partners Trulite Inc References US Census Bureau...

  5. Lehi, Utah: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Utah's 3rd congressional district.12 Registered Energy Companies in Lehi, Utah Tasco Engineering Inc References US Census Bureau Incorporated place and minor civil...

  6. Utah Code Annotated | Open Energy Information

    Open Energy Info (EERE)

    Code Ann. DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Utah Code Annotated Citation Utah Code Annotated (2014). Retrieved from...

  7. Utah/Incentives | Open Energy Information

    Open Energy Info (EERE)

    RecruitmentSupport Yes City of St. George - Energy Efficient Homes Rebate Program (Utah) Utility Rebate Program No City of St. George - Energy Star Appliance Rebate Program (Utah)...

  8. Utah Solar Outlook March 2010

    Office of Energy Efficiency and Renewable Energy (EERE)

    This presentation provides an overview of Utah's solar market, policy initiatives, and progress to date on the Solar America Cities Project: Solar Salt Lake.

  9. Foothills Parkway Section 8B Final Environmental Report, Volume 1

    SciTech Connect (OSTI)

    Blasing, T.J.; Cada, G.F.; Carer, M.; Chin, S.M.; Dickerman, J.A.; Etnier, D.A.; Gibson, R.; Harvey, M.; Hatcher, B.; Lietzske, D.; Mann, L.K.; Mulholland, P.J.; Petrich, C.H.; Pounds, L.; Ranney, J.; Reed, R.M.; Ryan, P.F.; Schweitzer, M.; Smith, D.; Thomason, P.; Wade, M.C.

    1999-07-01

    In 1994, Oak Ridge National Laboratory (ORNL) was tasked by the National Park Service (NPS) to prepare an Environmental Report (ER) for Section 8B of the Foothills Parkway in the Great Smoky Mountains National Park (GSMNP). Section 8B represents 27.7 km (14.2 miles) of a total of 115 km (72 miles) of the planned Foothills Parkway and would connect the Cosby community on the east to the incorporated town of Pittman Center to the west.

  10. Final environmental impact statement. Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Not Available

    1980-10-01

    In accordance with the National Environmental Policy Act (NEPA) of 1969, the US Department of Energy (DOE) has prepared this document as environmental input to future decisions regarding the Waste Isolation Pilot Plant (WIPP), which would include the disposal of transuranic waste, as currently authorized. The alternatives covered in this document are the following: (1) Continue storing transuranic (TRU) waste at the Idaho National Engineering Laboratory (INEL) as it is now or with improved confinement. (2) Proceed with WIPP at the Los Medanos site in southeastern New Mexico, as currently authorized. (3) Dispose of TRU waste in the first available repository for high-level waste. The Los Medanos site would be investigated for its potential suitability as a candidate site. This is administration policy and is the alternative preferred by the DOE. (4) Delay the WIPP to allow other candidate sites to be evaluated for TRU-waste disposal. This environmental impact statement is arranged in the following manner: Chapter 1 is an overall summary of the analysis contained in the document. Chapters 2 and 4 set forth the objectives of the national waste-management program and analyze the full spectrum of reasonable alternatives for meeting these objectives, including the WIPP. Chapter 5 presents the interim waste-acceptance criteria and waste-form alternatives for the WIPP. Chapters 6 through 13 provide a detailed description and environmental analysis of the WIPP repository and its site. Chapter 14 describes the permits and approvals necessary for the WIPP and the interactions that have taken place with Federal, State, and local authorities, and with the general public in connection with the repository. Chapter 15 analyzes the many comments received on the DEIS and tells what has been done in this FEIS in response. The appendices contain data and discussions in support of the material in the text.

  11. EIS-0408: DOE Notice of Availability of a Final Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Western Area Power Administration and the U.S. Fish and Wildlife Service, as joint lead agencies, announced the availability of the Upper Great Plains Wind Energy Final Programmatic Environmental Impact Statement.

  12. LM Issues Final Programmatic Environmental Impact Statement on the Uranium Leasing Program

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) has released the Final Uranium Leasing Program Programmatic Environmental Impact Statement (PEIS) to the public. The document can be found on the DOE Office of...

  13. EIS-0408: EPA Notice of Availability of a Final Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Western Area Power Administration and the U.S. Fish and Wildlife Service, as joint lead agencies, announced the availability of the Upper Great Plains Wind Energy Final Programmatic Environmental Impact Statement.

  14. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect (OSTI)

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  15. DOE/EA-1752 FINAL ENVIRONMENTAL ASSESSMENT FOR THE PACIFIC GAS AND ELECTRIC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    52 FINAL ENVIRONMENTAL ASSESSMENT FOR THE PACIFIC GAS AND ELECTRIC COMPANY (PG&E) COMPRESSED AIR ENERGY STORAGE (CAES) COMPRESSION TESTING PHASE PROJECT, SAN JOAQUIN COUNTY, CALIFORNIA U.S. Department of Energy National Energy Technology Laboratory May 2014 DOE/EA-1752 FINAL ENVIRONMENTAL ASSESSMENT FOR THE PACIFIC GAS AND ELECTRIC COMPANY (PG&E) COMPRESSED AIR ENERGY STORAGE (CAES) COMPRESSION TESTING PHASE PROJECT, SAN JOAQUIN COUNTY, CALIFORNIA U.S. Department of Energy National

  16. DOE/EA-1753 FINAL ENVIRONMENTAL ASSESSMENT FOR THE BEACON POWER CORPORATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 FINAL ENVIRONMENTAL ASSESSMENT FOR THE BEACON POWER CORPORATION FLYWHEEL FREQUENCY REGULATION PLANT, CHICAGO HEIGHTS, ILLINOIS (SITE 1), AND HAZLE TOWNSHIP, PENNSYLVANIA (SITE 2) U.S. Department of Energy National Energy Technology Laboratory Arpil 2011 DOE/EA-1753 FINAL ENVIRONMENTAL ASSESSMENT FOR THE BEACON POWER CORPORATION FLYWHEEL FREQUENCY REGULATION PLANT, CHICAGO HEIGHTS, ILLINOIS (SITE 1), AND HAZLE TOWNSHIP, PENNSYLVANIA (SITE 2) U.S. Department of Energy National Energy Technology

  17. DOE/EA-1754 FINAL ENVIRONMENTAL ASSESSMENT FOR THE PUBLIC SERVICE COMPANY OF

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 FINAL ENVIRONMENTAL ASSESSMENT FOR THE PUBLIC SERVICE COMPANY OF NEW MEXICO PHOTOVOLTAIC PLUS BATTERY FOR SIMULTANEOUS VOLTAGE SMOOTHING AND PEAK SHIFTING PROJECT, BERNALILLO COUNTY, NEW MEXICO U.S. Department of Energy National Energy Technology Laboratory September 2010 DOE/EA-1754 FINAL ENVIRONMENTAL ASSESSMENT FOR THE PUBLIC SERVICE COMPANY OF NEW MEXICO PHOTOVOLTAIC PLUS BATTERY FOR SIMULTANEOUS VOLTAGE SMOOTHING AND PEAK SHIFTING PROJECT, BERNALILLO COUNTY, NEW MEXICO U.S. Department of

  18. DOE/EA-1976 FINAL ENVIRONMENTAL ASSESSMENT FOR THE EMERA CNG, LLC,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    976 FINAL ENVIRONMENTAL ASSESSMENT FOR THE EMERA CNG, LLC, COMPRESSED NATURAL GAS PROJECT, PORT OF PALM BEACH, CITY OF RIVIERA BEACH, PALM BEACH COUNTY, FLORIDA U.S. Department of Energy National Energy Technology Laboratory October 2015 DOE/EA-1976 i COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Final Environmental Assessment for the Emera CNG, LLC, Compressed Natural Gas Project, Port of Palm Beach, City of Riviera Beach, Palm Beach County, Florida (DOE/EA-1976D)

  19. EA-1440-S1: Final Supplement to the Site-Wide Environmental Assessment |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy -S1: Final Supplement to the Site-Wide Environmental Assessment EA-1440-S1: Final Supplement to the Site-Wide Environmental Assessment National Renewable Energy Laboratory's South Table Mountain Complex, Golden Field Office, National Renewable Energy Laboratory The Department of Energy (DOE) is proposing an action consisting of three site development projects at the National Renewable Energy Laboratory's (NREL) South Table Mountain (STM) site at Golden, Colorado:

  20. EIS-0360: EPA Notice of Availability of the Final Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy Final Environmental Impact Statement EIS-0360: EPA Notice of Availability of the Final Environmental Impact Statement Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site The U.S. Department of Energy (DOE) proposes, via a contract awarded at the direction of Congress (Public Law 107-206), to design, construct, and operate two conversion facilities for converting depleted uranium hexafluoride