Sample records for upgrading tower modifications

  1. Top: Rudder Tower is one of 24 Texas A&M buildings undergoing energy efficiency upgrades.

    E-Print Network [OSTI]

    Top: Rudder Tower is one of 24 Texas A&M buildings undergoing energy efficiency upgrades. Bottom: From the left: Jeff Murray, Siemens; Jim Riley, Director Utilities & Energy Management, Texas A&M; Jacob Richardson, Siemens; Les Williams, Associate Director Utilities & Energy Management, Texas A

  2. Network Upgrade for the SLC: Control System Modifications

    SciTech Connect (OSTI)

    Crane, M.; Mackenzie, R.; Sass, R.; Himel, T.; /SLAC

    2011-09-09T23:59:59.000Z

    Current communications between the SLAC Linear Collider control system central host and the SLCmicros is built upon the SLAC developed SLCNET communication hardware and protocols. We will describe how the Internet Suite of protocols (TCP/IP) are used to replace the SLCNET protocol interface. The major communication pathways and their individual requirements are described. A proxy server is used to reduce the number of total system TCP/IP connections. The SLCmicros were upgraded to use Ethernet and TCP/IP as well as SLCNET. Design choices and implementation experiences are addressed.

  3. Convection towers

    DOE Patents [OSTI]

    Prueitt, M.L.

    1996-01-16T23:59:59.000Z

    Convection towers which are capable of cleaning the pollution from large quantities of air, of generating electricity, and of producing fresh water utilize the evaporation of water sprayed into the towers to create strong airflows and to remove pollution from the air. Turbines in tunnels at the skirt section of the towers generate electricity, and condensers produce fresh water. 6 figs.

  4. Convection towers

    DOE Patents [OSTI]

    Prueitt, Melvin L. (Los Alamos, NM)

    1994-01-01T23:59:59.000Z

    Convection towers which are capable of cleaning the pollution from large quantities of air and of generating electricity utilize the evaporation of water sprayed into the towers to create strong airflows and to remove pollution from the air. Turbines in tunnels at the skirt section of the towers generate electricity. Other embodiments may also provide fresh water, and operate in an updraft mode.

  5. Convection towers

    DOE Patents [OSTI]

    Prueitt, Melvin L. (Los Alamos, NM)

    1996-01-01T23:59:59.000Z

    Convection towers which are capable of cleaning the pollution from large quantities of air, of generating electricity, and of producing fresh water utilize the evaporation of water sprayed into the towers to create strong airflows and to remove pollution from the air. Turbines in tunnels at the skirt section of the towers generate electricity, and condensers produce fresh water.

  6. Convection towers

    DOE Patents [OSTI]

    Prueitt, Melvin L. (Los Alamos, NM)

    1995-01-01T23:59:59.000Z

    Convection towers which are capable of cleaning the pollution from large quantities of air, of generating electricity, and of producing fresh water utilize the evaporation of water sprayed into the towers to create strong airflows and to remove pollution from the air. Turbines in tunnels at the skirt section of the towers generate electricity, and condensers produce fresh water.

  7. Cooling Towers--Energy Conservation Strategies 

    E-Print Network [OSTI]

    Matson, J.

    1991-01-01T23:59:59.000Z

    COOLING TOWERS -- ENERGY CONSERVATION STRATEGIES Cooling Water Optimization Dr. JACK MATSON Environmental Engg. Dept. University of Houston Houston, Texas A cooling water system can be optimized by operating the cooling tower... pressures on generating turbines and all of the good things listed above can be achieved with a well upgraded modernized cooling tower, but if minimum or no attention is paid to the water chemistry, poor performance, and loss of energy and dollar...

  8. Convection towers

    DOE Patents [OSTI]

    Prueitt, M.L.

    1994-02-08T23:59:59.000Z

    Convection towers which are capable of cleaning the pollution from large quantities of air and of generating electricity utilize the evaporation of water sprayed into the towers to create strong airflows and to remove pollution from the air. Turbines in tunnels at the skirt section of the towers generate electricity. Other embodiments may also provide fresh water, and operate in an updraft mode. 5 figures.

  9. Tokyo Tower

    E-Print Network [OSTI]

    Hacker, Randi; Tsutsui, William; Ashworth, William

    2007-01-03T23:59:59.000Z

    Broadcast Transcript: Scanning the skyline of the Japanese capital today, it's hard to catch sight of Tokyo Tower. Modeled on the Eiffel Tower and 333 meters in height, the orange-and-white landmark is the world's tallest self-supporting steel...

  10. Unique Solar Thermal Laboratory Gets an Upgrade | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Unique Solar Thermal Laboratory Gets an Upgrade Unique Solar Thermal Laboratory Gets an Upgrade September 10, 2010 - 2:54pm Addthis This power tower is part of the...

  11. Cooling Towers, The Neglected Energy Resource

    E-Print Network [OSTI]

    Burger, R.

    for the sale. This paper investigates the internal elements of the typical types of cooling towers currently used, delineates their functions and shows how to upgrade them in the real world for energy savings and profitability of operation. Hard before... and after statistics of costs and profits obtained through optimization of colder water by engineered thermal upgrading will be discussed. Salient points will be reenforced with on-the-job, hands-on, slides and illustrations. HISTORICAL NEGLECT From...

  12. Cooling Towers: Understanding Key Components of Cooling Towers...

    Office of Environmental Management (EM)

    Cooling Towers: Understanding Key Components of Cooling Towers and How to Improve Water Efficiency Cooling Towers: Understanding Key Components of Cooling Towers and How to Improve...

  13. THE RELATIVISTIC HEAVY ION COLLIDER (RHIC) CRYOGENIC SYSTEM AT BNL: REVIEW OF THE MODIFICATIONS AND UPGRADES SINCE 2002 AND PLANNED IMPROVEMENTS.

    SciTech Connect (OSTI)

    THAN,Y.R.; TUOZZOLO, J.; SIDI-YAKHLEF, A.; GANNI, V.; KNUDSEN, P.; ARENIUS, D.

    2007-07-16T23:59:59.000Z

    Brookhaven National Laboratory continues its multi-year program to improve the operational efficiency, reliability, and stability of the cryogenic system which also resulted in improved beam availability of the Relativistic Heavy Ion Collider (RHIC). This paper summarizes the work and changes made after each phase over the past four years to the present, as well as proposed future improvements. Power usage dropped from an initial 9.4 MW to the present 5.1 MW and is expected to drop below 5 MW after the completion of the remaining proposed improvements. The work proceeded in phases by balancing the Collider's schedule of operation, time required for the modifications and budget constraints. The main changes include process control, compressor oil removal and management, elimination of the use of cold compressors and two liquid helium storage tanks, insulation of the third liquid helium storage tank, compressor bypass flow reduction and the addition of a load turbine (Joule-Thompson expander) with associated heat exchangers at the cold end of the plant. Also, liquid helium pumps used for forced circulation of the sub-cooled helium through the magnet loops were eliminated by an accelerator supply flow reconfiguration. Planned future upgrades include the resizing of expanders 5 and 6 to increase their efficiencies.

  14. Beneath the shadow of the Tower Soldiers' Tower

    E-Print Network [OSTI]

    Beneath the shadow of the Tower Soldiers' Tower Schedule of Events October-November 2013 As of Oct. 21, 2013 Telephone: 416-978-3485 (office) E-mail: soldiers.tower@utoronto.ca Soldiers' Tower Web Site: www.alumni.utoronto.ca/tower Facebook: www.facebook.com/soldierstower U of T Events web site: www

  15. Optimal Solid Space Tower

    E-Print Network [OSTI]

    Alexander Bolonkin

    2007-01-08T23:59:59.000Z

    Theory and computations are provided for building of optimal (minimum weight) solid space towers (mast) up to one hundred kilometers in height. These towers can be used for tourism; scientific observation of space, observation of the Earth surface, weather and upper atmosphere experiment, and for radio, television, and communication transmissions. These towers can also be used to launch spaceships and Earth satellites. These macroprojects are not expensive. They require strong hard material (steel). Towers can be built using present technology. Towers can be used (for tourism, communication, etc.) during the construction process and provide self-financing for further construction. The tower design does not require human work at high altitudes; the tower is separated into sections; all construction can be done at the Earth surface. The transport system for a tower consists of a small engine (used only for friction compensation) located at the Earth surface. Problems involving security, control, repair, and stability of the proposed towers are addressed in other cited publications.

  16. Vice President CEO, Tower Foundation

    E-Print Network [OSTI]

    Su, Xiao

    Vice President CEO, Tower Foundation Administrative Assistant to the AVP Information Representative Tower Foundation Charitable Gifts Officer Gift Analyst Gift Analyst Gift Analyst Senior Analyst Tower Foundation Stewardship Director Graphic Designer Administrative Assistant Web Communications

  17. Wind tower service lift

    DOE Patents [OSTI]

    Oliphant, David; Quilter, Jared; Andersen, Todd; Conroy, Thomas

    2011-09-13T23:59:59.000Z

    An apparatus used for maintaining a wind tower structure wherein the wind tower structure may have a plurality of legs and may be configured to support a wind turbine above the ground in a better position to interface with winds. The lift structure may be configured for carrying objects and have a guide system and drive system for mechanically communicating with a primary cable, rail or other first elongate member attached to the wind tower structure. The drive system and guide system may transmit forces that move the lift relative to the cable and thereby relative to the wind tower structure. A control interface may be included for controlling the amount and direction of the power into the guide system and drive system thereby causing the guide system and drive system to move the lift relative to said first elongate member such that said lift moves relative to said wind tower structure.

  18. Control Tower Procedures Nolan, Chap 6

    E-Print Network [OSTI]

    1 1 Control Tower Procedures Nolan, Chap 6 2 Control Towers · Responsibilities: 1. Ensure Towers · VFR Towers ­ NOT delegated separation responsibility · Except initial departure traffic ­ ARTCC separates IFR traffic · Non-radar-approach control towers ­ Delegated IFR separation responsibility

  19. The Monster Tower and Action Selectors

    E-Print Network [OSTI]

    Howard, Wyatt

    2013-01-01T23:59:59.000Z

    The Monster Tower . . . . . . . . . . . . . . . . . . . .3.2.1 Constructing the Monster Tower. . . . . . . . . 3.2.2Material for the Monster Tower 7.1 Definition of a Goursat

  20. The Relativistic Heavy Ion Collider (RHIC) cryogenic system at Brookhaven National Laboratory: Review of the modifications and upgrades since 2002 and planned improvements.

    SciTech Connect (OSTI)

    Than, R.; Tuozzolo, Joseph; Sidi-Yekhlef, Ahmed; Ganni, Venkatarao; Knudsen, Peter; Arenius, Dana

    2008-03-01T23:59:59.000Z

    Brookhaven National Laboratory continues its multi-year program to improve the operational efficiency, reliability, and stability of the cryogenic system, which also resulted in an improved beam availability of the Relativistic Heavy Ion Collider (RHIC). This paper summarizes the work and changes made after each phase over the past four years to the present, as well as proposed future improvements. Power usage dropped from an initial 9.4 MW to the present 5.1 MW and is expected to drop below 5 MW after the completion of the remaining proposed improvements. The work proceeded in phases, balancing the Collider's schedule of operation, time required for the modifications and budget constraints. The main changes include process control, compressor oil removal and management, elimination of the use of cold compressors and two liquid-helium storage tanks, insulation of the third liquid-helium storage tank, compressor-bypass flow reduction and the addition of a load turbine (Joule-Thomson ex

  1. The nominal cooling tower

    SciTech Connect (OSTI)

    Burger, R. [Burger Associates, Dallas, TX (United States)

    1995-12-31T23:59:59.000Z

    The heat Rejection Industry defines a nominal cooling tower as circulating three gallons of water per minute (GPM) per ton of refrigeration from entering the tower at 95{degrees}F. Hot Water temperature (HWT) Leaving at 85{degrees}F Cold Water Temperature (CWT) at a Design Wet Bulb of 70{degrees}F (WBT). Manufacturers then provide a selection chart based on various wet bulb temperatures and HWTs. The wet bulb fluctuates and varies through out the world since it is the combination ambient temperature, relative humidity, and/or dew point. Different HWT and CWT requirements are usually charted as they change, so that the user can select the nominal cooling tower model recommended by the manufacturer. Ask any HVAC operator, refinery manager, power generating station operator what happens when the Wet Bulb reaches or exceeds the design WBT of the area. He probably will tell you, {open_quotes}My cooling tower works quite well, but in the summer time, I usually have trouble with it.{close_quotes} This occurs because he is operating a nominal cooling tower.

  2. Cooling Towers- Energy Conservation Strategies Understanding Cooling Towers 

    E-Print Network [OSTI]

    Smith, M.

    1991-01-01T23:59:59.000Z

    Cooling towers are energy conservation devices that Management, more often than not, historically overlooks in the survey of strategies for plant operating efficiencies. The utilization of the colder water off the cooling tower is the money maker!...

  3. Cooling Towers- Energy Conservation Strategies Understanding Cooling Towers

    E-Print Network [OSTI]

    Smith, M.

    Cooling towers are energy conservation devices that Management, more often than not, historically overlooks in the survey of strategies for plant operating efficiencies. The utilization of the colder water off the cooling tower is the money maker!...

  4. Cooling Towers, The Debottleneckers

    E-Print Network [OSTI]

    Burger, R.

    Power generating plants and petro-chemical works are always expanding. An on-going problem is to identify and de-bottle neck restricting conditions of growth. The cooling tower is a highly visible piece of equipment. Most industrial crossflow units...

  5. Cooling Towers, The Debottleneckers 

    E-Print Network [OSTI]

    Burger, R.

    1998-01-01T23:59:59.000Z

    looking into the function of the cooling tower, which is to produce colder water- and question the quality of water discharged from that simple appearing box. These cross-flow structures are quite large, ranging up to 60 feet tall with as many as 6 or more...

  6. Ammonia removal process upgrade to the Acme Steel Coke Plant

    SciTech Connect (OSTI)

    Harris, J.L. [Acme Steel Co., Chicago, IL (United States). Chicago Coke Plant

    1995-12-01T23:59:59.000Z

    The need to upgrade the ammonia removal process at the Acme Steel Coke Plant developed with the installation of the benzene NESHAP (National Emission Standard for Hazardous Air Pollutants) equipment, specifically the replacement of the final cooler. At Acme Steel it was decided to replace the existing open cooling tower type final cooler with a closed loop direct spray tar/water final cooler. This new cooler has greatly reduced the emissions of benzene, ammonia, hydrogen sulfide and hydrogen cyanide to the atmosphere, bringing them into environmental compliance. At the time of its installation it was not fully recognized as to the effect this would have on the coke oven gas composition. In the late seventies the decision had been made at Acme Steel to stop the production of ammonia sulfate salt crystals. The direction chosen was to make a liquid ammonia sulfate solution. This product was used as a pickle liquor at first and then as a liquid fertilizer as more markets were developed. In the fall of 1986 the ammonia still was brought on line. The vapors generated from the operation of the stripping still are directed to the inlet of the ammonia absorber. At that point in time it was decided that an improvement to the cyclical ammonia removal process was needed. The improvements made were minimal yet allowed the circulation of solution through the ammonia absorber on a continuous basis. The paper describes the original batch process and the modifications made which allowed continuous removal.

  7. IMU Activities Tower Application and Contract 1 INDIANA MEMORIAL UNION STUDENT ACTIVITIES TOWER

    E-Print Network [OSTI]

    Indiana University

    IMU Activities Tower Application and Contract 1 INDIANA MEMORIAL UNION STUDENT ACTIVITIES TOWER March 21, 2012 Union Board Office- 2nd floor of the IMU Activities Tower ­ room 270 The following Student Activities Tower: Organization Name

  8. Experimental Number Theory Part I : Tower Arithmetic

    E-Print Network [OSTI]

    Zeilberger, Doron

    Experimental Number Theory Part I : Tower Arithmetic by Edinah K. Gnang January 15, 2011 1 rooted trees, which we shall here refer to as towers. The bijection between numbers and towers provides by XXX = (xk)1kn , (1) a tower expansion ( or simply a tower ) over XXX is a finite product of iterated

  9. Improving Process Cooling Tower Eddiciency

    E-Print Network [OSTI]

    Turpish, W.

    2013-01-01T23:59:59.000Z

    -Fifth Industrial Energy Technology Conference New Orleans, LA. May 21-24, 2013 2 Types of Cooling Towers Forced Draft Towers ESL-IE-13-05-08 Proceedings of the Thrity-Fifth Industrial Energy Technology Conference New Orleans, LA. May 21-24, 2013 3 Types... of Cooling Towers Induced draft Cross-flow ESL-IE-13-05-08 Proceedings of the Thrity-Fifth Industrial Energy Technology Conference New Orleans, LA. May 21-24, 2013 4 Types of Cooling Towers Induced Draft-Counter Flow Two-cell Single Cell Four Cell...

  10. Sandia National Laboratories: anemometer towers

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    anemometer towers Characterizing Scaled Wind Farm Technology Facility Inflow On April 1, 2014, in Energy, News, News & Events, Partnership, Renewable Energy, Wind Energy The Scaled...

  11. Best Management Practice #10: Cooling Tower Management

    Broader source: Energy.gov [DOE]

    Cooling towers regulate temperature by dissipating heat from recirculating water used to cool chillers, air-conditioning equipment, or other process equipment. Heat is rejected from the tower...

  12. Untapped Energy Savings from Cooling Towers 

    E-Print Network [OSTI]

    Phelps Jr., P.

    2011-01-01T23:59:59.000Z

    of cooling towers; crossflow and counterflow. Many older towers are of the crossflow type and many newer towers are counterflow. The two types are most easily identified by looking at the sides of the tower. Crossflow towers have the air inlets all... the way up the sides of the tower, and air is drawn inward across the falling water, hence the term crossflow. Counterflow towers only have inlets around the bottom of the tower, and air is drawn in and upward through the falling water, hence the term...

  13. Stellar Explosions by Magnetic Towers

    E-Print Network [OSTI]

    Dmitri A. Uzdensky; Andrew I. MacFadyen

    2006-05-05T23:59:59.000Z

    We propose a magnetic mechanism for the collimated explosion of a massive star relevant for GRBs, XRFs and asymmetric supernovae. We apply Lynden-Bell's magnetic tower scenario to the interior of a massive rotating star after the core has collapsed to form a black hole with an accretion disk or a millisecond magnetar acting as a central engine. We solve the force-free Grad-Shafranov equation to calculate the magnetic structure and growth of a tower embedded in a stellar environment. The pressure of the toroidal magnetic field, continuously generated by differential rotation of the central engine, drives a rapid expansion which becomes vertically collimated after lateral force balance with the surrounding gas pressure is reached. The collimation naturally occurs because hoop stress concentrates magnetic field toward the rotation axis and inhibits lateral expansion. This leads to the growth of a self-collimated magnetic tower. When embedded in a massive star, the supersonic expansion of the tower drives a strong bow shock behind which an over-pressured cocoon forms. The cocoon confines the tower by supplying collimating pressure and provides stabilization against disruption due to MHD instabilities. Because the tower consists of closed field lines starting and ending on the central engine, mixing of baryons from the cocoon into the tower is suppressed. The channel cleared by the growing tower is thus plausibly free of baryons and allows the escape of magnetic energy from the central engine through the star. While propagating down the stellar density gradient, the tower accelerates and becomes relativistic. During the expansion, fast collisionless reconnection becomes possible resulting in dissipation of magnetic energy which may be responsible for GRB prompt emission.

  14. TOWER OF COARSE MODULI KINYA KIMURA

    E-Print Network [OSTI]

    Fried, Michael

    TOWER OF COARSE MODULI KINYA KIMURA Modular Towers is introduced by M. Fried for analogue of the towers of modular curves in the framework of Hurwitz space theory. Let p be a prime, G a p of which order of the elements is prime to p. Then we can consider the tower of Hurwitz space associated

  15. THE UNIVERSITY OF EDINBURGH APPLETON TOWER

    E-Print Network [OSTI]

    Edinburgh, University of

    THE UNIVERSITY OF EDINBURGH APPLETON TOWER A GUIDE TO ACCESS AND FACILITIES Appleton Tower confirm the evacuation arrangements". #12;Introduction Disabled Access Guide for Appleton Tower APPLETON TOWER was named in posthumous honour of physicist Sir Edward Appleton, the Principal who oversaw

  16. Methodologies for Continuous Cellular Tower Data Analysis

    E-Print Network [OSTI]

    Clauset, Aaron

    Methodologies for Continuous Cellular Tower Data Analysis Nathan Eagle1,2 , John A. Quinn3 cellular tower data from 215 randomly sampled subjects in a major urban city. We demonstrate the potential by tower transitions. The tower groupings from these unsupervised clustering techniques are subsequently

  17. David Hume Tower George Square, Edinburgh

    E-Print Network [OSTI]

    Edinburgh, University of

    David Hume Tower George Square, Edinburgh EH8 9JX 0131 650 8295 http://www.ed.ac.uk/maps THE UNIVERSITY OF EDINBURGH DAVID HUME TOWER A GUIDE TO ACCESS AND FACILITIES #12;If you require this document the evacuation arrangements". #12;Disabled Access Guide for David Hume Tower Introduction DAVID HUME TOWER

  18. A' Brief. History of the Tower Shielding Facility and Tower Shielding Facility

    E-Print Network [OSTI]

    A' Brief. History of the Tower Shielding Facility and Programs Tower Shielding Facility Hoisting Equipment and Handling Pool Tower Shielding Reactor TSR-II Assembly and Outer Reflector Reactor Suspension buildings (1953) 0 Towers form a lOO- by 200-j? rectangle 0 Unit weight of towers less than 400 lb/' - gives

  19. Edison memory upgrade

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Edison memory upgraded during the maintenance in Jan 13-16, 2015 Edison memory upgraded during the maintenance in Jan 13-16, 2015 January 16, 2015 (0 Comments) Edison compute node...

  20. rig upgrades2.qxp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    mitted a significant portion of its budget to upgrade several items on its existing drilling rig at Naval Petroleum Reserve No. 3 (NPR-3). Many of the upgrades took place in...

  1. Cooling Towers, Energy Conservation Machines

    E-Print Network [OSTI]

    Burger, R.

    1980-01-01T23:59:59.000Z

    Cooling towers, in all too many industrial plants, are often the neglected units of the process chain which are hidden bonanzas for energy conservation and dollar savings. By lowering the entire systems temperature by the use of colder water...

  2. Sandia National Laboratories: Power Towers

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Trough Systems CLFR Power Towers Acciona Abengoa Sener Solar Millennium SkyFuel Siemens Ausra SPGMann SkyFuel Abengoa Brightsource Energy SolarReserve eSolar Dish Engine...

  3. Cooling Towers, Energy Conservation Strategies

    E-Print Network [OSTI]

    Burger, R.

    1983-01-01T23:59:59.000Z

    system. While our engineers are pretty well convinced of the importance of their sophisticated equipment, and rightly so, they take the cooling towers and the cold water returning from them for granted. Design Conditions are specified...

  4. Tower Temperature and Humidity Sensors (TWR) Handbook

    SciTech Connect (OSTI)

    Cook, DR

    2010-02-01T23:59:59.000Z

    Three tall towers are installed at the Atmospheric Radiation Measurement (ARM) Climate Research Facility: a 60-meter triangular tower at the Southern Great Plains (SGP) Central Facility (CF), a 21-meter walkup scaffolding tower at the SGP Okmulgee forest site (E21), and a 40-meter triangular tower at the North Slope of Alaska (NSA) Barrow site. The towers are used for meteorological, radiological, and other measurements.

  5. Multi-objective optimization of solar tower power plants

    E-Print Network [OSTI]

    Ábrahám, Erika

    Multi-objective optimization of solar tower power plants Pascal Richter Center for Computational · Optimization of solar tower power plants 1/20 #12;Introduction ­ Solar tower power plants Solar tower PS10 (11 of the solar tower Pascal Richter · Optimization of solar tower power plants 2/20 #12;Model of solar tower

  6. 7.2.9. Tower 7.2.10. Winterdienstgebude /

    E-Print Network [OSTI]

    Berlin,Technische Universität

    .2.9.3.4.3 Überwachung der Notstromversorgung des Towers 7.2.9.3.5 Kälteversorgung des Towers / Cooling Supply of Tower 7

  7. Dynamic response of guyed towers

    E-Print Network [OSTI]

    Gillcrist, Mark Christopher

    1984-01-01T23:59:59.000Z

    also account for entrapped sea water in the tower legs as well as added hydrodynamic mass. Sarpkya and Isaacson (9) show that the added hydrodynamic mass, m , per unit length of a circular cylinder can be closely approximated by m = psr 2 a (3. 1... bending associated with the guyed tower's fundamental mode. The global damping matrix, used in this study, is assumed to account for all sources of damping, with the exception of hydrodynamic damping (implicit in the nonlinear drag term of Morison...

  8. CSP Tower Air Brayton Combustor

    Broader source: Energy.gov [DOE]

    This fact sheet describes a concentrating solar power tower air Brayton combustor project awarded under the DOE's 2012 SunShot CSP R&D award program. The team, led by the Southwest Research Institute, is working to develop an external combustor that allows for the mixing of CSP-heated air with natural gas in hybridized power plants. This project aims to increase the temperature capabilities of the CSP tower air receiver and gas turbine to 1,000ºC and achieve energy conversion efficiencies greater than 50%.

  9. See the UT Tower going dark? There's a reason why Tower joins campus in conservation project

    E-Print Network [OSTI]

    Johnston, Daniel

    See the UT Tower going dark? There's a reason why Tower joins campus in conservation project KXAN orange or even its typical white, the University of Texas Tower will join the dark night sky as part of a campus-wide energy conservation project. This is the first time the Tower will take part in Longhorn

  10. RUDDER TOWER: You are standing in the lobby of Rudder Tower, home to the Appelt

    E-Print Network [OSTI]

    RUDDER TOWER: You are standing in the lobby of Rudder Tower, home to the Appelt Aggieland Visitor Center. The lobby elevators take you up Rudder Tower, where the office of the president of Texas A to the Plaza, you'll be facing Albritton Tower in the distance; you will hear its Westminster chimes ring every

  11. Capturing Energy Upgrades

    Broader source: Energy.gov [DOE]

    Provides an overview of how to capture the value of energy efficiency upgrades in the real estate market, from CNT Energy.

  12. The D0 Upgrade

    SciTech Connect (OSTI)

    Abachi, S.; D0 Collaboration

    1995-07-01T23:59:59.000Z

    In this paper we describe the approved DO Upgrade detector, and its physics capabilities. The DO Upgrade is under construction and will run during the next Fermilab collider running period in early 1999 (Run II). The upgrade is designed to work at the higher luminosities and shorter bunch spacings expected during this run. The major elements of t he upgrade are: a new tracking system with a silicon tracker, scintillating fiber tracker, a 2T solenoid, and a central preshower detector; new calorimeter electronics; new muon trigger and tracking detectors with new muon system electronics; a forward preshower detector; new trigger electronics and DAQ improvements to handle the higher rates.

  13. Upgrading through Preprocessing Technologies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upgrading through Preprocessing Technologies The challenges of efficiently converting raw biomass into usable, affordable, customized bioenergy feedstdocks are many. The bioenergy...

  14. Livingston Campus North and South Tower

    E-Print Network [OSTI]

    Livingston Campus North and South Tower General Instructions: · Print directions and name.7 miles). Continue on Route 18 North. · Follow the signs for Towers move in. From Garden State Parkway the Raritan River (approximately 3.7 miles). Continue on Route 18 North. · Follow the signs for Towers move in

  15. Cooling Tower Inspection with Scuba

    E-Print Network [OSTI]

    Brenner, W.

    1982-01-01T23:59:59.000Z

    tower pump suction basin was accomplished by diving into the basin using SCUBA gear. It was possible to see a build-up of debris on the pump suction basket strainers and on the floor of the sumps. Also, it was discovered that one of the four baskets had...

  16. Analysis Efforts Supporting NSTX Upgrades

    SciTech Connect (OSTI)

    H.Zhang, P. Titus, P. Rogoff, A.Zolfaghari, D. Mangra, M. Smith

    2010-11-29T23:59:59.000Z

    The National Spherical Torus Experiment (NSTX) is a low aspect ratio, spherical torus (ST) configuration device which is located at Princeton Plasma Physics Laboratory (PPPL) This device is presently being updated to enhance its physics by doubling the TF field to 1 Tesla and increasing the plasma current to 2 Mega-amperes. The upgrades include a replacement of the centerstack and addition of a second neutral beam. The upgrade analyses have two missions. The first is to support design of new components, principally the centerstack, the second is to qualify existing NSTX components for higher loads, which will increase by a factor of four. Cost efficiency was a design goal for new equipment qualification, and reanalysis of the existing components. Showing that older components can sustain the increased loads has been a challenging effort in which designs had to be developed that would limit loading on weaker components, and would minimize the extent of modifications needed. Two areas representing this effort have been chosen to describe in more details: analysis of the current distribution in the new TF inner legs, and, second, analysis of the out-of-plane support of the existing TF outer legs.

  17. Cooling Tower Considerations for Energy Optimizations

    E-Print Network [OSTI]

    Burger, R.

    1986-01-01T23:59:59.000Z

    accumulat- ing in the strainers and tubes. The California Redwood Institute states that the service life of thin section Redwood used in cooling towers .is a'pproximately 15 to 20 years. Therefore, in these older-type towers the fill Is usually... of the art cellular film fill packing. Figure 6. Eight cell blow-thru tower where rebuilding lowered the water temperature 4OF greatly reducing compressor head pressures and temperatures thereby lowering energy consumption throughout the system...

  18. Vortex-augmented cooling tower - windmill combination

    DOE Patents [OSTI]

    McAllister, J.E. Jr.

    1982-09-02T23:59:59.000Z

    A cooling tower for cooling large quantities of effluent water from a production facility by utilizing natural wind forces includes the use of a series of helically directed air inlet passages extending outwardly from the base of the tower to introduce air from any direction in a swirling vortical pattern while the force of the draft created in the tower makes it possible to place conventional power generating windmills in the air passage to provide power as a by-product.

  19. WIND DATA REPORT WBZ Tower, Hull, MA

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    WIND DATA REPORT WBZ Tower, Hull, MA 9/1/06-11/30/06 Prepared for Department of Energy (DOE) Golden.................................................................................................................... 10 Wind Speed Time Series...........................................................................................................

  20. WIND DATA REPORT WBZ Tower, Hull, MA

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    WIND DATA REPORT WBZ Tower, Hull, MA 11/13/06-11/30/06 Prepared for Department of Energy (DOE.................................................................................................................... 10 Wind Speed Time Series.........................................................................................................

  1. How to Build a Tower

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC) EnvironmentalGyroSolé(tm) HarmonicbetandEnergy 2010a Wind Turbine WorksHomeTower

  2. Pueblo Towers | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag Jump to:ID8/OrganizationTechProbSolutionsPublic ArtTexas Jump to:Towers Jump to:

  3. Wind turbine tower for storing hydrogen and energy

    DOE Patents [OSTI]

    Fingersh, Lee Jay (Westminster, CO)

    2008-12-30T23:59:59.000Z

    A wind turbine tower assembly for storing compressed gas such as hydrogen. The tower assembly includes a wind turbine having a rotor, a generator driven by the rotor, and a nacelle housing the generator. The tower assembly includes a foundation and a tubular tower with one end mounted to the foundation and another end attached to the nacelle. The tower includes an in-tower storage configured for storing a pressurized gas and defined at least in part by inner surfaces of the tower wall. In one embodiment, the tower wall is steel and has a circular cross section. The in-tower storage may be defined by first and second end caps welded to the inner surface of the tower wall or by an end cap near the top of the tower and by a sealing element attached to the tower wall adjacent the foundation, with the sealing element abutting the foundation.

  4. Out of Ashes and Rubble: The Pirelli Tower

    E-Print Network [OSTI]

    Ziegler, Claudia J.

    2009-01-01T23:59:59.000Z

    Agnese’s text. 13. The Pirelli tower was novel, experimentalpostwar periods, or that the tower was a departure from theand Rubble: The Pirelli Tower Claudia J. Ziegler At the end

  5. Hydrogen Storage in Wind Turbine Towers: Cost Analysis and Conceptual...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Wind Turbine Towers: Cost Analysis and Conceptual Design Hydrogen Storage in Wind Turbine Towers: Cost Analysis and Conceptual Design Preprint 34851.pdf More Documents &...

  6. Cyclotron Institute Upgrade Project

    SciTech Connect (OSTI)

    Clark, Henry [Texas A& M University; Yennello, Sherry [Texas A& M University; Tribble, Robert [Texas A& M University

    2014-08-26T23:59:59.000Z

    The Cyclotron Institute at Texas A&M University has upgraded its accelerator facilities to extend research capabilities with both stable and radioactive beams. The upgrade is divided into three major tasks: (1) re-commission the K-150 (88”) cyclotron, couple it to existing beam lines to provide intense stable beams into the K-500 experimental areas and use it as a driver to produce radioactive beams; (2) develop light ion and heavy ion guides for stopping radioactive ions created with the K-150 beams; and (3) transport 1+ ions from the ion guides into a charge-breeding electron-cyclotron-resonance ion source (CB-ECR) to produce highly-charged radioactive ions for acceleration in the K-500 cyclotron. When completed, the upgraded facility will provide high-quality re-accelerated secondary beams in a unique energy range in the world.

  7. Advanced Photon Source Upgrade Project

    ScienceCinema (OSTI)

    Mitchell, John; Gibson, Murray; Young, Linda; Joachimiak, Andrzej

    2013-04-19T23:59:59.000Z

    Upgrade to Advanced Photon Source announced by Department Of Energy. Read more: http://go.usa.gov/ivZ

  8. SRS control system upgrade requirements

    SciTech Connect (OSTI)

    Hill, L.F.

    1998-08-04T23:59:59.000Z

    This document defines requirements for an upgrade of the Sodium Removal System (SRS) control system. The upgrade is being performed to solve a number of maintainability and operability issues. The upgraded system will provide the same functions, controls and interlocks as the present system, and in addition provide enhanced functionality in areas discussed in this document.

  9. Tevatron detector upgrades

    SciTech Connect (OSTI)

    Lipton, R.; /Fermilab

    2005-01-01T23:59:59.000Z

    The D0 and CDF experiments are in the process of upgrading their detectors to cope with the high luminosities projected for the remainder of Tevatron Run II. They discuss the expected Tevatron environment through 2009, the detector challenges due to increasing luminosity in this period, and the solutions undertaken by the two experiments to mitigate detector problems and maximize physics results.

  10. Biochemical upgrading of oils

    DOE Patents [OSTI]

    Premuzic, E.T.; Lin, M.S.

    1999-01-12T23:59:59.000Z

    A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed. 121 figs.

  11. Biochemical upgrading of oils

    DOE Patents [OSTI]

    Premuzic, Eugene T. (East Moriches, NY); Lin, Mow S. (Rocky Point, NY)

    1999-01-12T23:59:59.000Z

    A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing in organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed.

  12. ISIS upgrades David Findlay

    E-Print Network [OSTI]

    McDonald, Kirk

    ISIS upgrades David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC Proton Accelerators for Science and Innovation, 12­14 January 2012, FNAL #12;2 ISIS World for research in the physical and life sciences National and international community of >2000 scientists -- ISIS

  13. NSTX-U Control System Upgrades

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Erickson, K G; Gates, D A; Gerhardt, S P; Lawson, J E; Mozulay, R; Sichta, P; Tchilinguirian, G J

    2014-06-01T23:59:59.000Z

    The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forward port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control.

  14. Optimal sequencing of a cooling tower with multiple cells

    E-Print Network [OSTI]

    Zhang, Z.; Liu, J.

    2012-01-01T23:59:59.000Z

    This paper evaluates the energy savings potential of multi-cell cooling tower optimal sequencing control methods. Annual tower fan energy usage is calculated for a counter-flow tower with multiple variable-speed fans. Effectiveness-NTU tower model...

  15. THE GROUP OF SYMMETRIES OF THE TOWER OF HANOI GRAPH

    E-Print Network [OSTI]

    Behrstock, Jason

    THE GROUP OF SYMMETRIES OF THE TOWER OF HANOI GRAPH SO EUN PARK The classical Tower of Hanoi puzzle the tower of disks to another peg, moving one topmost disk at a time while never stacking a disk referred to as the Tower of Hanoi problem. Figure 1. Convention for labeling k pegs and n disks

  16. Charlotte Teachers' Circle September 17, 2011 Tower of Hanoi

    E-Print Network [OSTI]

    Reiter, Harold

    1 Charlotte Teachers' Circle September 17, 2011 Tower of Hanoi The Tower of Hanoi as the Tower of Brahma. According to the legend, when the last move of the puzzle is completed, the world of the three pegs. The objective of the puzzle is to move the entire tower to one of the other pegs

  17. A New Tower Over Cubic Finite Fields , Arnaldo Garcia

    E-Print Network [OSTI]

    Yanikoglu, Berrin

    A New Tower Over Cubic Finite Fields Alp Bassa , Arnaldo Garcia and Henning Stichtenoth We present a new explicit tower of function fields (Fn)n0 over the finite field with = q3 elements, where the limit). This tower contains as a subtower the tower which was introduced by Bezerra­ Garcia­Stichtenoth (see [3

  18. Effects of guy wires on SWECS tower dynamics. Technical report

    SciTech Connect (OSTI)

    Butterfield, C P; Pykkonen, K R; Sexton, J H

    1980-07-01T23:59:59.000Z

    The Rocky Flats (RF) Supporting Research and Technology (SRT) study for tower testing/analysis has led to some useful information concerning the effect of tower guy pretension on small wind system tower dynamics. The effect of guy-wire pretension on tower natural frequencies is usually considered negligible if the guy: (1) has no sag caused by gravity, and (2) the tension is not approaching the tower buckling load. At the rf test center it was found that, for the test tower even when these conditions were avoided, the guy fundamental frequency must be 30% greater than the tower fundamental frequency to maintain the fundamental's characteristics.

  19. Advanced wet-dry cooling tower concept

    E-Print Network [OSTI]

    Snyder, Troxell Kimmel

    The purpose of this years' work has been to test and analyze the new dry cooling tower surface previously developed. The model heat transfer test apparatus built last year has been instrumented for temperature, humidity ...

  20. Cooling Towers, The Neglected Energy Resource

    E-Print Network [OSTI]

    Burger, R.

    1985-01-01T23:59:59.000Z

    Loving care is paid to the compressors, condensers, and computer programs of refrigeration systems. When problems arise, operator: run around in circles with expensive "fixes", but historically ignore the poor orphan, the cooling tower perched...

  1. Cooling Towers--Energy Conservation Strategies

    E-Print Network [OSTI]

    Matson, J.

    A cooling water system can be optimized by operating the cooling tower at the highest possible cycles of concentration without risking sealing and fouling of heat exchanger surfaces, tube bundles, refrigeration equipment, overhead condensers...

  2. WIND DATA REPORT WBZ Tower, Hull, MA

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    WIND DATA REPORT WBZ Tower, Hull, MA 12/1/06-2/28/07 Prepared for Department of Energy (DOE) Golden...................................................................................................................... 8 Wind Speed Time Series............................................................................................................. 9 Wind Speed Distributions

  3. Projective preservation : reframing Rudolph's Tower for Boston

    E-Print Network [OSTI]

    Turner, Jessica K

    2012-01-01T23:59:59.000Z

    By 2012, the fate of Paul Rudolph's tower in downtown Boston has been in question for years while a vision of a denser city calls for its demolition. Projected development on the site currently argues that to move forward, ...

  4. Stability Properties of Magnetic Tower Jets

    E-Print Network [OSTI]

    Masanori Nakamura; Hui Li; Shengtai Li

    2006-08-31T23:59:59.000Z

    Stability properties of ``magnetic tower'' jets propagating in the gravitationally stratified background have been examined by performing three-dimensional magnetohydrodynamic simulations. The current-carrying, Poynting flux-dominated magnetic tower jet, which possesses a highly wound helical magnetic field, is subject to the current-driven instability (CDI). We find that, under general physical conditions including small perturbations in the initial background profiles, the propagating magnetic tower jets develop the non-axisymmetric, $m=1$ kink mode of the CDI. The kink mode grows on the local Alfv\\'en crossing time scale. In addition, two types of kink modes appear in the system. At the central region where external thermal pressure confinement is strong, only the internal kink mode is excited and will grow. A large distance away from the central region where the external thermal pressure becomes low, the external kink mode is observed. As a result, the exterior of magnetic tower jets will be deformed into a large-scale wiggled structure. We also discuss extensively the different physical processes that contribute to the overall stability properties of the magnetic tower jets. Specifically, when the jet propagates in an initially unperturbed background, we find that they can survive the kink mode beyond the point predicted by the well-known Kruskal-Shafranov (K-S) criterion. The stabilization in this case comes mainly from the dynamical relaxation of magnetic twists during the propagation of magnetic towers; the magnetic pitch is reduced and the corresponding K-S critical wavelength becomes longer as the tower jet proceeds. Furthermore, we show that the pressure-driven and Kelvin-Helmholtz instabilities do not occur in the magnetic tower jets.

  5. Upgraded Coal Interest Group

    SciTech Connect (OSTI)

    Evan Hughes

    2009-01-08T23:59:59.000Z

    The Upgraded Coal Interest Group (UCIG) is an EPRI 'users group' that focuses on clean, low-cost options for coal-based power generation. The UCIG covers topics that involve (1) pre-combustion processes, (2) co-firing systems and fuels, and (3) reburn using coal-derived or biomass-derived fuels. The UCIG mission is to preserve and expand the economic use of coal for energy. By reducing the fuel costs and environmental impacts of coal-fired power generation, existing units become more cost effective and thus new units utilizing advanced combustion technologies are more likely to be coal-fired.

  6. Upgrade of the D0 detector: The Tevatron beyond 2 fb**(-1)

    SciTech Connect (OSTI)

    Quinn, Breese; /Mississippi U.

    2005-01-01T23:59:59.000Z

    Recent performance of Fermilab's Tevatron has exceeded this year's design goals and further accelerator upgrades are underway. The high-luminosity period which follows these improvements is known as Run IIb. The D0 experiment is in the midst of a comprehensive upgrade program designed to enable it to thrive with much higher data rate and occupancy. Extensive modifications of and additions to all levels of the trigger and the silicon tracker are in progress. All upgrade projects are on schedule for installation in the 2005 shutdown.

  7. The Upgrade of the ATLAS Tile Calorimeter Readout Electronics for Phase II

    E-Print Network [OSTI]

    ATLAS Tile Collaboration; The ATLAS collaboration

    2015-01-01T23:59:59.000Z

    The Large Hadron Collider at CERN is scheduled to undergo a major upgrade, called the Phase II Upgrade, in 2022. The ATLAS Tile Calorimeter community will do major modifications to the sub-detector to account for the increased luminosity. More specifically, a large proportion of the current front and back-end electronics will be upgraded in order to digitize all signals generated in the Calorimeters. A Demonstrator program has been established, which combines the current and future architectures, as a proof of principle. The insertion of the first demonstrator is planned for the end of 2015.

  8. The Fermilab Linac Upgrade

    SciTech Connect (OSTI)

    Noble, R.J.

    1991-02-01T23:59:59.000Z

    The Fermilab Linac Upgrade is planned to increase the energy of the H- linac from 200 to 400 MeV. This is intended to reduce the incoherent space-charge tuneshift at injection into the 8 GeV Booster which can limit either the brightness or the total intensity of the beam. The Linac Upgrade will be achieved by replacing the last four 201.25 MHz drift-tube tanks which accelerate the beam from 116 to 200 MeV, with seven 805 MHz side-coupled cavity modules operating at an average axial field of abut 7.5 MV/m. This will allow acceleration to 400 MeV in the existing Linac enclosure. Each accelerator module will be driven with a klystron-based rf power supply. A prototype rf modulator has been built and tested at Fermilab, and a prototype 12 MW klystron is being fabricated by Litton Electron Devices. Fabrication of production accelerator modules is in progress. 8 figs., 4 tabs.

  9. Energy Efficiency Upgrades

    SciTech Connect (OSTI)

    Roby Williams

    2012-03-29T23:59:59.000Z

    The energy efficiency upgrades project at Hardin County General Hospital did not include research nor was it a demonstration project. The project enabled the hospital to replace outdated systems with modern efficient models. Hardin County General Hospital is a 501c3, nonprofit hospital and the sole community provider for Hardin and Pope Counties of Illinois. This project provided much needed equipment and facility upgrades that would not have been possible through locally generated funding. Task 1 was a reroofing of the hospital. The hospital architect designed the replacement to increase the energy efficiency of the hospital roof/ceiling structure. Task 2 was replacement and installation of a new more efficient CT scanner for the hospital. Included in the project was replacement of HVAC equipment for the entire radiological suite. Task 5 was a replacement and installation of a new higher capacity diesel-fueled emergency generator for the hospital replacing a 50+ year old gas-fired generator. Task 7 was the replacement of 50+ year-old walk-in cooler/freezer with a newer, energy efficient model. Task 8 was the replacement of 10+ year-old washing machines in the hospital laundry with higher capacity, energy efficient models. Task 9 was replacement of 50-year old single pane curtain window system with double-pane insulated windows. Additionally, insulation was added around ventilation systems and the curtain wall system.

  10. Upgrading the Vanadium Redox Battery | EMSL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upgrading the Vanadium Redox Battery Upgrading the Vanadium Redox Battery New electrolyte mix increases energy storage by 70 percent After developing a more effective...

  11. Webinar: "Upgrading Renewable and Sustainable Carbohydrates for...

    Office of Environmental Management (EM)

    "Upgrading Renewable and Sustainable Carbohydrates for the Production of High Energy Density Fuels" Webinar: "Upgrading Renewable and Sustainable Carbohydrates for the Production...

  12. Campus Utility Upgrades | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    will provide essential support for the Argonne Leadership Computing Facility high performance computing upgrades, expected to occur in FY 2018. Campus utility upgrades also support...

  13. Digital places : rethinking urban elements : the case of the tower

    E-Print Network [OSTI]

    Gichuhi, Christopher M. (Christopher Mwethera), 1976-

    2004-01-01T23:59:59.000Z

    Problem - How can we make working, living and all aspects of our life in the urban tower more palatable? How can we create environment at the urban tower scale. With technology as one of the biggest drivers of social and ...

  14. Wind Turbine Towers Establish New Height Standards and Reduce...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Wind Turbine Towers Establish New Height Standards and Reduce Cost of Wind Energy Wind Turbine Towers Establish New Height Standards and Reduce Cost of Wind Energy Case study that...

  15. Lifting system and apparatus for constructing wind turbine towers

    DOE Patents [OSTI]

    Livingston, Tracy; Schrader, Terry; Goldhardt, James; Lott, James

    2011-02-01T23:59:59.000Z

    The disclosed invention is utilized for mounting a wind turbine and blade assembly on the upper end of a wind turbine tower. The invention generally includes a frame or truss that is pivotally secured to the top bay assembly of the tower. A transverse beam is connected to the frame or truss and extends fore of the tower when the frame or truss is in a first position and generally above the tower when in a second position. When in the first position, a wind turbine or blade assembly can be hoisted to the top of the tower. The wind turbine or blade assembly is then moved into position for mounting to the tower as the frame or truss is pivoted to a second position. When the turbine and blade assembly are secured to the tower, the frame or truss is disconnected from the tower and lowered to the ground.

  16. NSTX-U Control System Upgrades

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Erickson, K. G.; Gates, D. A.; Gerhardt, S. P.; Lawson, J. E.; Mozulay, R.; Sichta, P.; Tchilinguirian, G. J.

    2014-06-01T23:59:59.000Z

    The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forwardmore »port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control.« less

  17. Boise Air Traffic Control Tower: High Performance and sustainable Building Guiding Principles Technical Assistance

    SciTech Connect (OSTI)

    Fowler, Kimberly M.; Goel, Supriya; Henderson, Jordan W.

    2013-09-01T23:59:59.000Z

    Overview of energy efficiency opportunities for new FAA tower construction using the Boise Air Traffic Control Tower as an example.

  18. Bankers in the Ivory Tower: The Financialization of Governance at the University of California

    E-Print Network [OSTI]

    Eaton, Charlie; Goldstein, Adam; Habinek, Jacob; Kumar, Mukul; Stover, Tamera Lee; Roehrkasse, Alex

    2013-01-01T23:59:59.000Z

    Bankers in the Ivory Tower: The Financialization ofBankers in the Ivory Tower: The Financialization of

  19. New North Dakota Factory to Produce Wind Towers, Jobs

    Broader source: Energy.gov [DOE]

    Wind tower factory could bring back some of the jobs lost when a machine manufacturing plant closed.

  20. Tenneco upgrades natural gasoline

    SciTech Connect (OSTI)

    O'Gorman, E.K.

    1986-08-01T23:59:59.000Z

    Tenneco Oil Co. recently completed a natural gasoline upgrading project at its LaPorte, Tex., facility. The project was started in October 1985. The purpose was to fractionate natural gasoline and isomerize the n-pentane component. Three factors made this a particularly attractive project for the LaPorte complex: 1. The phase down of lead in gasoline made further processing of natural gasoline desirable. 2. Idle equipment and trained personnel were available at the plant as a result of a switch of Tenneco's natural gas liquids (NGL) fractionation to its Mont Belvieu, Tex., facility. 3. The plant interconnects with Houston's local markets. It has pipelines to Mont Belvieu, Texas City, and plants along the Houston Ship Channel, as well as truck, tank car, and barge-loading facilities. Here are the details on the operation of the facilities, the changes which were required to enable the plant to operate successfully, and how this conversion was completed in a timely fashion.

  1. Structural Optimization of High Voltage Transmission Line Towers considering

    E-Print Network [OSTI]

    Colominas, Ignasi

    Structural Optimization of High Voltage Transmission Line Towers considering Continuum and Discrete/or to common designs largely repeated (e.g. automotive compo- nents), and high voltage transmission towers can than conventional designs of high voltage transmission line towers. The optimization model proposed

  2. MARTIN'S MAXIMUM AND TOWER FORCING SEAN COX AND MATTEO VIALE

    E-Print Network [OSTI]

    Viale, Matteo

    MARTIN'S MAXIMUM AND TOWER FORCING SEAN COX AND MATTEO VIALE Abstract. There are several examples, the Reflection Princi- ple (RP) implies that if I is a tower of ideals which concentrates on the class GIC1 of 1 [16], shows that if PFA+ or MM holds and there is an inaccessible cardinal, then there is a tower

  3. About the Design & Construction Collaborative Life Sciences Building & Skourtes Tower

    E-Print Network [OSTI]

    Chapman, Michael S.

    About the Design & Construction Collaborative Life Sciences Building & Skourtes Tower Life Sciences Building & Skourtes Tower (CLSB) is an innovative model for health sciences education intention. The building's volumes--the 12-story north tower and the five-story south wing--are connected

  4. 30TH INTERNATIONAL COSMIC RAY CONFERENCE The TALE Tower Detector

    E-Print Network [OSTI]

    30TH INTERNATIONAL COSMIC RAY CONFERENCE The TALE Tower Detector D. R. BERGMAN1 , FOR THE TA and extend the range of its energy coverage to lower energies. One of the TALE detectors is a "tower cosmic rays with energies between 1016.5 and 1018 eV. To achieve this low-energy sensitivity the tower

  5. Muirhead Tower Atrium 9 January17 May 2013

    E-Print Network [OSTI]

    Birmingham, University of

    Muirhead Tower Atrium 9 January­17 May 2013 Weekdays 9am­6pm William Morris and the Kelmscott Press Morris died. Muirhead Tower Atrium, 9 January­17 May 2013 Twitter: @CadburyRL See more exhibitions from Muirhead Tower, Lower Ground Floor University of Birmingham, B15 2TT E: special-collections@bham.ac.uk T

  6. Tower Foundation of SJSU Procurement Card Program Policies & Procedures

    E-Print Network [OSTI]

    Eirinaki, Magdalini

    Tower Foundation of SJSU Procurement Card Program Policies & Procedures General Information Overview of Program The Tower Foundation ProCard program has been implemented to provide easy be an authorized signer on the Tower account. Purchases made with the ProCard are billed to Approving Official

  7. THE TOWER AT THE END OF COMMENCEMENT, 2006 THE GENERAL

    E-Print Network [OSTI]

    Texas at Austin, University of

    THE TOWER AT THE END OF COMMENCEMENT, 2006 THE GENERAL UNIVERSITY OF TEXAS INFORMATION AT AUSTIN O Box 7216, Austin TX 78713- 7216. Cover: The Tower at the conclusion of Commencement 2006 of the Tower and celebrated with a fireworks display and light show. Issue Number 2006/5 August 2006

  8. The Albany Particle Tower: Online Access for High School Students

    E-Print Network [OSTI]

    Cinabro, David

    The Albany Particle Tower: Online Access for High School Students Kristen Melnyk­Elsner Kimball education outreach program, the Albany Particle Tower (APT) has been made available online to students who to run the detector and analyze real time data. Introduction The Albany Particle Tower is a Cosmic Ray

  9. Cooling Towers--Energy Conservation Strategies Preservative Spray Treatment Maintains Cooling Tower

    E-Print Network [OSTI]

    Reidenback, R.

    Several problems common to most industrial wood framed cooling towers can be easily controlled with annual preservative spray treatment applications to the plenum area framework and drift eliminators. It eliminates the expensive periodic repairs due...

  10. Untapped Energy Savings from Cooling Towers

    E-Print Network [OSTI]

    Phelps Jr., P.

    2011-01-01T23:59:59.000Z

    A cooling tower is often an overlooked source of easy energy savings. As long as it's running not much thought is usually given to it, but when numbers are applied to how much a degree of colder water is worth it can become a valuable and ready...

  11. PERFORMANCE ANALYSIS OF MECHANICAL DRAFT COOLING TOWER

    SciTech Connect (OSTI)

    Lee, S; Alfred Garrett, A; James02 Bollinger, J; Larry Koffman, L

    2009-02-10T23:59:59.000Z

    Industrial processes use mechanical draft cooling towers (MDCT's) to dissipate waste heat by transferring heat from water to air via evaporative cooling, which causes air humidification. The Savannah River Site (SRS) has cross-flow and counter-current MDCT's consisting of four independent compartments called cells. Each cell has its own fan to help maximize heat transfer between ambient air and circulated water. The primary objective of the work is to simulate the cooling tower performance for the counter-current cooling tower and to conduct a parametric study under different fan speeds and ambient air conditions. The Savannah River National Laboratory (SRNL) developed a computational fluid dynamics (CFD) model and performed the benchmarking analysis against the integral measurement results to accomplish the objective. The model uses three-dimensional steady-state momentum, continuity equations, air-vapor species balance equation, and two-equation turbulence as the basic governing equations. It was assumed that vapor phase is always transported by the continuous air phase with no slip velocity. In this case, water droplet component was considered as discrete phase for the interfacial heat and mass transfer via Lagrangian approach. Thus, the air-vapor mixture model with discrete water droplet phase is used for the analysis. A series of parametric calculations was performed to investigate the impact of wind speeds and ambient conditions on the thermal performance of the cooling tower when fans were operating and when they were turned off. The model was also benchmarked against the literature data and the SRS integral test results for key parameters such as air temperature and humidity at the tower exit and water temperature for given ambient conditions. Detailed results will be published here.

  12. Surface and Tower Meteorological Instrumentation at NSA Handbook - January 2006

    SciTech Connect (OSTI)

    MT Ritsche

    2006-01-30T23:59:59.000Z

    The Surface and Tower Meteorological Instrumentation at Atqasuk (METTWR2H) uses mainly conventional in situ sensors to measure wind speed, wind direction, air temperature, dew point and humidity mounted on a 10-m tower. It also obtains barometric pressure, visibility, and precipitation data from sensors at or near the base of the tower. In addition, a Chilled Mirror Hygrometer is located at 1 m for comparison purposes. Temperature and relative humidity probes are mounted at 2 m and 5 m on the tower. For more information, see the Surface and Tower Meteorological Instrumentation at Atqasuk Handbook.

  13. Global Scratch Upgrade in Progress

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rates, Connection to PDSF October 29, 2013 The most used file system at the National Energy Research Scientific Computing Center (NERSC)-global scratch-just got an upgrade. As...

  14. ISIS Project Upgrade Campus Community

    E-Print Network [OSTI]

    Massachusetts at Lowell, University of

    ISIS Project Upgrade Campus Community Page Navigation Page | 1 Page navigation has changed in the ISIS Application. This document provides you with the new location of all your key Campus Community the Navigation Pagelets": ISIS.UML..EDU #12;

  15. MAST Upgrade - Construction Status

    E-Print Network [OSTI]

    Milnes, Joe; Dhalla, Fahim; Fishpool, Geoff; Hill, John; Katramados, Ioannis; Martin, Richard; Naylor, Graham; O'Gorman, Tom; Scannell, Rory

    2015-01-01T23:59:59.000Z

    The Mega Amp Spherical Tokamak (MAST) is the centre piece of the UK fusion research programme. In 2010, a MAST Upgrade programme was initiated with three primary objectives, to contribute to: 1) Testing reactor concepts (in particular exhaust solutions via a flexible divertor allowing Super-X and other extended leg configurations); 2) Adding to the knowledge base for ITER (by addressing important plasma physics questions and developing predictive models to help optimise ITER performance of ITER) and 3) Exploring the feasibility of using a spherical tokamak as the basis for a fusion Component Test Facility. With the project mid-way through its construction phase, progress will be reported on a number of the critical subsystems. This will include manufacture and assembly of the coils, armour and support structures that make up the new divertors, construction of the new set coils that make up the centre column, installation of the new power supplies for powering the divertor coils and enhanced TF coil set, progr...

  16. Wet/dry cooling tower and method

    DOE Patents [OSTI]

    Glicksman, Leon R. (Lynnfield, MA); Rohsenow, Warren R. (Waban, MA)

    1981-01-01T23:59:59.000Z

    A wet/dry cooling tower wherein a liquid to-be-cooled is flowed along channels of a corrugated open surface or the like, which surface is swept by cooling air. The amount of the surface covered by the liquid is kept small compared to the dry part thereof so that said dry part acts as a fin for the wet part for heat dissipation.

  17. Energy Upgrade California Drives Demand From Behind the Wheel...

    Energy Savers [EERE]

    Upgrade California Drives Demand From Behind the Wheel Energy Upgrade California Drives Demand From Behind the Wheel Photo of a trailer with the Energy Upgrade California logo and...

  18. Conversion Technologies for Advanced Biofuels - Bio-Oil Upgrading...

    Office of Environmental Management (EM)

    Oil Upgrading Conversion Technologies for Advanced Biofuels - Bio-Oil Upgrading PNNL report-out at the CTAB webinar on Bio-Oil Upgrading. ctabwebinarbiooilsupgrading.pdf More...

  19. Oral Syllabus of David Nacin Minor Topic: The Automorphism Tower Problem

    E-Print Network [OSTI]

    Oral Syllabus of David Nacin Minor Topic: The Automorphism Tower Problem Simon Thomas: The Automorphism Tower Problem 1. The Automorphism Tower Problem (a) The Automorphism Tower Problem (b) Some Fundamental Results (c) Some Examples of Automorphism Towers (d) The Infinite Dihedral Group 2. Wielandt

  20. Vortex-augmented cooling tower-windmill combination

    DOE Patents [OSTI]

    McAllister, Jr., John E. (Aiken, SC)

    1985-01-01T23:59:59.000Z

    A cooling tower for cooling large quantities of effluent water from a production facility by utilizing natural wind forces includes the use of a series of helically directed air inlet passages extending outwardly from the base of the tower to introduce air from any direction in a swirling vortical pattern while the force of the draft created in the tower makes it possible to place conventional power generating windmills in the air passages to provide power as a by-product.

  1. Optimization of Multiple Receivers Solar Power Tower systems

    E-Print Network [OSTI]

    2015-04-08T23:59:59.000Z

    Apr 8, 2015 ... Solar Power Tower (SPT) systems are known as one of the most promising ...... An appropriate control is required to adapt the mass flow in the ...

  2. Optimization of Multiple Receivers Solar Power Tower systems

    E-Print Network [OSTI]

    Emilio Carrizosa

    2015-03-26T23:59:59.000Z

    Mar 26, 2015 ... Abstract: In this article a new procedure to optimize the design of a Multiple Receivers Solar Power Tower system is presented. The proposed ...

  3. airport tower stressful: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Summary: Abstract For technical, aesthetic and economical reasons, future power transmission line towers will have to be built with new design concepts using new...

  4. airport control towers: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Summary: Abstract For technical, aesthetic and economical reasons, future power transmission line towers will have to be built with new design concepts using new...

  5. Upcoming Funding Opportunity for Tower Manufacturing and Installation...

    Energy Savers [EERE]

    intends to support partnerships that lead to innovative designs and processes for wind turbine tower manufacturing and turbine system installation. Supported projects will develop...

  6. The Damaging Effects of Earthquake Excitation on Concrete Cooling Towers

    SciTech Connect (OSTI)

    Abedi-Nik, Farhad [SADRA Institute of Higher Education, Tehran (Iran, Islamic Republic of); Sabouri-Ghomi, Saeid [K.N.T University of Technology, Tehran (Iran, Islamic Republic of)

    2008-07-08T23:59:59.000Z

    Reinforced concrete cooling towers of hyperbolic shell configuration find widespread application in utilities engaged in the production of electric power. In design of critical civil infrastructure of this type, it is imperative to consider all the possible loading conditions that the cooling tower may experience, an important loading condition in many countries is that of the earthquake excitation, whose influence on the integrity and stability of cooling towers is profound. Previous researches have shown that the columns supporting a cooling tower are sensitive to earthquake forces, as they are heavily loaded elements that do not possess high ductility, and understanding the behavior of columns under earthquake excitation is vital in structural design because they provide the load path for the self weight of the tower shell. This paper presents the results of a finite element investigation of a representative 'dry' cooling tower, using realistic horizontal and vertical acceleration data obtained from the recent and widely-reported Tabas, Naghan and Bam earthquakes in Iran. The results of both linear and nonlinear analyses are reported in the paper, the locations of plastic hinges within the supporting columns are identified and the ramifications of the plastic hinges on the stability of the cooling tower are assessed. It is concluded that for the (typical) cooling tower configuration analyzed, the columns that are instrumental in providing a load path are influenced greatly by earthquake loading, and for the earthquake data used in this study the representative cooling tower would be rendered unstable and would collapse under the earthquake forces considered.

  7. TOWER OF COVERINGS OF QUASI-PROJECTIVE VARIETIES ...

    E-Print Network [OSTI]

    2012-04-25T23:59:59.000Z

    on a tower of coverings of a non-compact Kähler manifold of finite volume with reasonable geometric assumptions to its universal covering. Applicable examples ...

  8. Comparative evaluation of cooling tower drift eliminator performance

    E-Print Network [OSTI]

    Chan, Joseph Kwok-Kwong

    The performance of standard industrial evaporative cooling tower drift eliminators is analyzed using experiments and numerical simulations. The experiments measure the

  9. EFITviewer UpgradesEFITviewer Upgrades MDSplus Event Management System

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Summation System. red values indicate an alarm condition. #12;Web Tool Upgrades · Different Signals may is automatic · Signal names saved in a file may be pasted into Web Tool fields · "Memory" of previous entries improved #12;#12;#12;Web Tools can overlay profiles #12;

  10. ACAB software upgrade

    SciTech Connect (OSTI)

    Sanz, J.; Balmisa, J.M.

    1997-10-01T23:59:59.000Z

    This report address two issues, namely the ``Selection of the most current nuclear data libraries available`` and the ``User`s manual of the updated ACAB code``. A general summary of the major features of ACAB is provides in Section 1 which highlights the new capabilities included in the present version of ACAB. We address the issue of the nuclear data libraries selected as starting point in preparing the libraries to be used directly by ACAB. Section II describes the main features of the selected libraries. In Section IV, the impact of using these libraries in Inertial Fusion Energy, IFE, applications is assessed by comparing activation results obtained using different activation cross-sections data libraries. The points considered are the processing of libraries and libraries adapted to be directly read by ACAB. The ``processing`` efforts made within the frame of this project have been focused on the COLLAPSE code. Important modifications have been made, and in Section IV we provide an overall description of the new version. The content of the data bases employed by the updated ACAB code are described in Section V. The input data file for running ACAB is dealt with in Section VI, and some example problems are discussed in Section VII. Finally, regarding analysis of activation results we described in Section VIII the updated version of the CHAINS code.

  11. Quality Control, Standardization of Upgrades, and Workforce Expectatio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Control, Standardization of Upgrades, and Workforce Expectations Quality Control, Standardization of Upgrades, and Workforce Expectations Better Buildings Residential...

  12. Tower systems for Linearly repetitive Delone sets

    E-Print Network [OSTI]

    José Aliste-Prieto; Daniel Coronel

    2010-03-22T23:59:59.000Z

    In this paper we study linearly repetitive Delone sets and prove, following the work of Bellissard, Benedetti and Gambaudo, that the hull of a linearly repetitive Delone set admits a properly nested sequence of box decompositions (tower system) with strictly positive and uniformly bounded (in size and norm) transition matrices. This generalizes a result of Durand for linearly recurrent symbolic systems. Furthermore, we apply this result to give a new proof of a classic estimation of Lagarias and Pleasants on the rate of convergence of patch-frequencies.

  13. CXAllenRadioTower2.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced. C o w l i t z C o . C l a r8.0 -CURRICULUM VITAEAllen Radio Tower

  14. GreenTower | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetec AG ContractingGreenOrder Jump to: navigation,GreenTower Jump to:

  15. Tower, Minnesota: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries PvtStratosolarTharaldsonInformationTorpedo SpecialityVessel JumpTower,

  16. PS10 Solar Power Tower Xi Jing, Fang

    E-Print Network [OSTI]

    Prevedouros, Panos D.

    area equivalent of 17 American Football Tower Solar receiver 4 vertical panels 18ft*39ft Steam turbinePS10 Solar Power Tower Xi Jing, Fang #12;Overview Magnitudes , Cost & TechnologiesMagnitudes , Cost Government . #12;Further ExplanationFurther Explanation Plataforma Solar de Sanlúcar la Mayor,PSSM Megawatts

  17. A Microcomputer Model of Crossflow Cooling Tower Performance 

    E-Print Network [OSTI]

    Reichelt, G. E; Jones, J. W.

    1984-01-01T23:59:59.000Z

    that use both sensible heat transfer and mass transfer to cool. The heat and mass transfer process for a crossflow cooling tower has been modeled on an Apple II microcomputer. Various heat loads or weather conditions can be imposed on a given tower...

  18. Best Practice for Energy Efficient Cleanrooms: Cooling tower and condenser water optimization

    E-Print Network [OSTI]

    Xu, Tengfang

    2005-01-01T23:59:59.000Z

    for Energy Efficient Cleanrooms: Cooling Tower and Condenserfor Energy Efficient Cleanrooms: Cooling tower and condensertower and condenser water optimization Summary Cleanroom energy

  19. Purification of water from cooling towers and other heat exchange systems

    DOE Patents [OSTI]

    Sullivan; Enid J. (Los Alamos, NM), Carlson; Bryan J. (Ojo Caliente, NM), Wingo; Robert M. (Los Alamos, NM), Robison; Thomas W. (Stilwell, KS)

    2012-08-07T23:59:59.000Z

    The amount of silica in cooling tower water is reduced by passing cooling tower water through a column of silica gel.

  20. Group Date Location Room No. Group Day Date Location Room No. Monday 26 September David Hume Tower 9.18 Friday 30 September David Hume Tower 9.18

    E-Print Network [OSTI]

    Tittley, Eric

    Group Date Location Room No. Group Day Date Location Room No. Monday 26 September David Hume Tower 9.18 Friday 30 September David Hume Tower 9.18 10 October David Hume Tower 9.18 14 October David Hume Tower 9.18 24 October David Hume Tower 9.18 28 October David Hume Tower 9.18 07 November David

  1. Cooling towers, the neglected energy conservations and money making machine

    SciTech Connect (OSTI)

    Burger, R. [Burger Associates, Dallas, TX (United States)

    1996-12-31T23:59:59.000Z

    The heat Rejection Industry defines a nominal cooling tower as circulating three gallons of water per minute (GPM) per ton of refrigeration from entering the tower at 95 {degrees}F, Hot Water temperature (HWT), Leaving at 85{degrees}F Cold Water Temperature (CWT) at a Design Wet Bulb of 70{degrees}F (WBT). Manufacturers then provide a selection chart based on various wet bulb temperatures and HWTs. The wet bulb fluctuates and varies throughout the world since it is the combination ambient temperature, relative humidity, and/or dew point. Different HWT and CWT requirements are usually charted as they change, so that the user can select the nominal cooling tower model recommended by the manufacturer. In the specification of cooling towers it is necessary to clearly understand the definition of nominal cooling tower, and to make sure the specification you need addressed can be met by the system you purchase. This should be tested prior to final acceptance.

  2. MIPP Plastic Ball electronics upgrade

    SciTech Connect (OSTI)

    Baldin, Boris; /Fermilab

    2009-01-01T23:59:59.000Z

    An upgrade electronics design for Plastic Ball detector is described. The Plastic Ball detector was a part of several experiments in the past and its back portion (proposed to be used in MIPP) consists of 340 photomultipliers equipped with a sandwich scintillator. The scintillator sandwich has fast and slow signal component with decay times 10 ns and 1 {micro}s respectively. The upgraded MIPP experiment will collect up to 12,000 events during each 4 second spill and read them out in {approx}50 seconds between spills. The MIPP data acquisition system will employ deadtime-less concept successfully implemented in Muon Electronics of Dzero experiment at Fermilab. An 8-channel prototype design of the Plastic Ball Front End (PBFE) implementing these requirements is discussed. Details of the schematic design, simulation and prototype test results are discussed.

  3. Conversion Tower for Dispatchable Solar Power: High-Efficiency Solar-Electric Conversion Power Tower

    SciTech Connect (OSTI)

    None

    2012-01-11T23:59:59.000Z

    HEATS Project: Abengoa Solar is developing a high-efficiency solar-electric conversion tower to enable low-cost, fully dispatchable solar energy generation. Abengoa’s conversion tower utilizes new system architecture and a two-phase thermal energy storage media with an efficient supercritical carbon dioxide (CO2) power cycle. The company is using a high-temperature heat-transfer fluid with a phase change in between its hot and cold operating temperature. The fluid serves as a heat storage material and is cheaper and more efficient than conventional heat-storage materials, like molten salt. It also allows the use of a high heat flux solar receiver, advanced high thermal energy density storage, and more efficient power cycles.

  4. Tower reactors for bioconversion of lignocellulosic material

    DOE Patents [OSTI]

    Nguyen, Q.A.

    1998-03-31T23:59:59.000Z

    An apparatus is disclosed for enzymatic hydrolysis and fermentation of pretreated lignocellulosic material. The apparatus consists of a tower bioreactor which has mixers to achieve intermittent mixing of the material. Precise mixing of the material is important for effective heat and mass transfer requirements without damaging or denaturing the enzymes or fermenting microorganisms. The pretreated material, generally in the form of a slurry, is pumped through the bioreactor, either upwards or downwards, and is mixed periodically as it passes through the mixing zones where the mixers are located. For a thin slurry, alternate mixing can be achieved by a pumping loop which also serves as a heat transfer device. Additional heat transfer takes place through the reactor heat transfer jackets. 5 figs.

  5. Tower reactors for bioconversion of lignocellulosic material

    DOE Patents [OSTI]

    Nguyen, Quang A. (16458 W. 1st Ave., Golden, CO 80401)

    1998-01-01T23:59:59.000Z

    An apparatus for enzymatic hydrolysis and fermentation of pretreated lignocellulosic material, in the form of a tower bioreactor, having mixers to achieve intermittent mixing of the material. Precise mixing of the material is important for effective heat and mass transfer requirements without damaging or denaturing the enzymes or fermenting microorganisms. The pretreated material, generally in the form of a slurry, is pumped through the bioreactor, either upwards of downwards, and is mixed periodically as it passes through the mixing zones where the mixers are located. For a thin slurry, alternate mixing can be achieved by a pumping loop which also serves as a heat transfer device. Additional heat transfer takes place through the reactor heat transfer jackets.

  6. Tower reactors for bioconversion of lignocellulosic material

    DOE Patents [OSTI]

    Nguyen, Quang A. (16458 W. 1st Ave., Golden, CO 80401)

    1999-01-01T23:59:59.000Z

    An apparatus for enzymatic hydrolysis and fermentation of pretreated lignocellulosic material, in the form of a tower bioreactor, having mixers to achieve intermittent mixing of the material. Precise mixing of the material is important for effective heat and mass transfer requirements without damaging or denaturing the enzymes or fermenting microorganisms. The pretreated material, generally in the form of a slurry, is pumped through the bioreactor, either upwards or downwards, and is mixed periodically as it passes through the mixing zones where the mixers are located. For a thin slurry, alternate mixing can be achieved by a pumping loop which also serves as a heat transfer device. Additional heat transfer takes place through the reactor heat transfer jackets.

  7. Tower reactors for bioconversion of lignocellulosic material

    DOE Patents [OSTI]

    Nguyen, Q.A.

    1999-03-30T23:59:59.000Z

    An apparatus is described for enzymatic hydrolysis and fermentation of pretreated lignocellulosic material, in the form of a tower bioreactor, having mixers to achieve intermittent mixing of the material. Precise mixing of the material is important for effective heat and mass transfer requirements without damaging or denaturing the enzymes or fermenting microorganisms. The pretreated material, generally in the form of a slurry, is pumped through the bioreactor, either upwards or downwards, and is mixed periodically as it passes through the mixing zones where the mixers are located. For a thin slurry, alternate mixing can be achieved by a pumping loop which also serves as a heat transfer device. Additional heat transfer takes place through the reactor heat transfer jackets. 5 figs.

  8. Results from the CDMS 5-Tower Operation

    E-Print Network [OSTI]

    Jonghee Yoo; for the CDMS collaboration

    2008-10-20T23:59:59.000Z

    Astrophysical observations strongly suggest that non-luminous, nonbaryonic components, so called "Dark Matter", may constitute most of the matter in the Universe. The Cryogenic Dark Matter Search (CDMS) experiment is designed to detect Dark Matter interaction events through nuclear recoils from elastic scattering. The detector is capable of reading out both phonon and ionization energy of an interaction in Ge or Si crystals. We present results from the CDMS five-tower detector arrays. The data were collected in the period between October 2006 and July 2007 (with an effective exposure of 121.3 kg-days). No WIMP signal was observed. The results, when combined with previous CDMS Soudan data, set a 90% confidence level upper bound on the WIMP-nucleon cross section of $4.6\\times 10^{-44}$ cm$^2$ at 60 Gev/c$^2$ WIMP mass.

  9. Power Tower Technology Roadmap and cost reduction plan.

    SciTech Connect (OSTI)

    Mancini, Thomas R.; Gary, Jesse A. (U.S. Department of Energy); Kolb, Gregory J.; Ho, Clifford Kuofei

    2011-04-01T23:59:59.000Z

    Concentrating solar power (CSP) technologies continue to mature and are being deployed worldwide. Power towers will likely play an essential role in the future development of CSP due to their potential to provide dispatchable solar electricity at a low cost. This Power Tower Technology Roadmap has been developed by the U.S. Department of Energy (DOE) to describe the current technology, the improvement opportunities that exist for the technology, and the specific activities needed to reach the DOE programmatic target of providing competitively-priced electricity in the intermediate and baseload power markets by 2020. As a first step in developing this roadmap, a Power Tower Roadmap Workshop that included the tower industry, national laboratories, and DOE was held in March 2010. A number of technology improvement opportunities (TIOs) were identified at this workshop and separated into four categories associated with power tower subsystems: solar collector field, solar receiver, thermal energy storage, and power block/balance of plant. In this roadmap, the TIOs associated with power tower technologies are identified along with their respective impacts on the cost of delivered electricity. In addition, development timelines and estimated budgets to achieve cost reduction goals are presented. The roadmap does not present a single path for achieving these goals, but rather provides a process for evaluating a set of options from which DOE and industry can select to accelerate power tower R&D, cost reductions, and commercial deployment.

  10. Use of nanofiltration to reduce cooling tower water usage.

    SciTech Connect (OSTI)

    Sanchez, Andres L.; Everett, Randy L.; Jensen, Richard Pearson; Cappelle, Malynda A.; Altman, Susan Jeanne

    2010-09-01T23:59:59.000Z

    Nanofiltration (NF) can effectively treat cooling-tower water to reduce water consumption and maximize water usage efficiency of thermoelectric power plants. A pilot is being run to verify theoretical calculations. A side stream of water from a 900 gpm cooling tower is being treated by NF with the permeate returning to the cooling tower and the concentrate being discharged. The membrane efficiency is as high as over 50%. Salt rejection ranges from 77-97% with higher rejection for divalent ions. The pilot has demonstrated a reduction of makeup water of almost 20% and a reduction of discharge of over 50%.

  11. Use of nanofiltration to reduce cooling tower water consumption.

    SciTech Connect (OSTI)

    Altman, Susan Jeanne; Ciferno, Jared

    2010-10-01T23:59:59.000Z

    Nanofiltration (NF) can effectively treat cooling-tower water to reduce water consumption and maximize water usage efficiency of thermoelectric power plants. A pilot is being run to verify theoretical calculations. A side stream of water from a 900 gpm cooling tower is being treated by NF with the permeate returning to the cooling tower and the concentrate being discharged. The membrane efficiency is as high as over 50%. Salt rejection ranges from 77-97% with higher rejection for divalent ions. The pilot has demonstrated a reduction of makeup water of almost 20% and a reduction of discharge of over 50%.

  12. Canada's heavy oil, bitumen upgrading activity is growing

    SciTech Connect (OSTI)

    Corbett, R.A.

    1989-06-26T23:59:59.000Z

    Heavy oil and bitumen upgrading activity in Canada is surging with the recent start-up of two new upgraders and with plans to build others. These new upgraders make use of modern hydrocracking technology. Articles in this special report on upgrading focus on Canada's oil and bitumen reserves, the promising technologies that upgrade them, and present details of some of the current upgrader projects. This article covers the following areas: Canada's heavy oils; Upgrading expands; Upgrading technologies; Test results; Regional upgraders; High-quality light product.

  13. Tower of Hanoi Most of the following paragraphs were copied from wikipedia [I]. Pictures were bor-

    E-Print Network [OSTI]

    Lalín, Matilde

    Tower of Hanoi Most of the following paragraphs were copied from wikipedia [I]. Pictures were bor- rowed from [2] and [3]. The Tower of Hanoi or Towers of Hanoi is a mathematical game or puzzle known as the Tower of Brahma puzzle. It is not clear whether Lucas invented this legend or was inspired

  14. ON THE FRAME-STEWART ALGORITHM FOR THE TOWER MICHAEL RAND

    E-Print Network [OSTI]

    Behrstock, Jason

    ON THE FRAME-STEWART ALGORITHM FOR THE TOWER OF HANOI MICHAEL RAND 1. Introduction The Tower is to move the entire tower to another peg, while obeying the following restrictions: · Only one disk may have been: · What is the minimum number of moves required to transfer the entire tower from one peg

  15. FMRI BOLD Cerebellar Activation of First-episode Schizophrenia Patients during the Tower of London Task

    E-Print Network [OSTI]

    Thompson, Paul

    FMRI BOLD Cerebellar Activation of First-episode Schizophrenia Patients during the Tower of London difficulty (number of moves) when performing the Tower of London task. Left Figure: Example of a Tower Tower of London problem. (Yellow labels are for the purpose of illustration only and did not appear

  16. Upgrade Boilers with Energy-Efficient Burners

    SciTech Connect (OSTI)

    Not Available

    2006-01-01T23:59:59.000Z

    This revised ITP steam tip sheet on upgrading boilers provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  17. Jefferson Lab accelerator upgrade completed: Initial operations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE to begin initial operations of the Continuous Electron Beam Accelerator Facility (CEBAF) as part of its ongoing 338 million upgrade. With the approval of Critical...

  18. Energy Efficiency Evaluation of Guangzhou West Tower Façade System

    E-Print Network [OSTI]

    Meng, Q.; Zhang, L.

    2006-01-01T23:59:59.000Z

    of Public Buildings”, typical meteorological yearly data for Guangzhou were used and revised according to architectural character of Guangzhou West Tower. The energy efficiency design of a single skin façade and active airflow curtain wall was analyzed by a...

  19. Wind Shear Characteristics at Central Plains Tall Towers: Preprint

    SciTech Connect (OSTI)

    Schwartz, M.; Elliott, D.

    2006-06-01T23:59:59.000Z

    Conference paper for WindPower 2006 held June 4-7, 2006, in Pittsburgh, PA, describing the wind shear characteristics at tall tower sites in the Central Plains of the United States.

  20. Cooling Towers - Energy Conservation and Money Making Mechanisms

    E-Print Network [OSTI]

    Burger, R.

    1981-01-01T23:59:59.000Z

    cooling towers in operation are performing at levels as low as 50% of capability. This is energy wasteful and financially foolish. There are many reasons for this deficiency, among them the present service is greater than the original requirements...

  1. Introducing an Online Cooling Tower Performance Analysis Tool

    E-Print Network [OSTI]

    Muller, M.R.; Muller, M.B.; Rao, P.

    2012-01-01T23:59:59.000Z

    and variable nature of all of the factors that can influence performance; fan speed, wind speed, sump temperature, heat load, ambient temperature, relative humidity, etc. This can be overwhelming for a regular operator resulting in many cooling towers being set...

  2. Experimental Investigation of the Padding Tower for Air Dehumidifier

    E-Print Network [OSTI]

    Wang, J.; Liu, J.; Li, C.; Zhang, G.; An, S.

    2006-01-01T23:59:59.000Z

    , and solar power as the heat source for regeneration. Hence, this system has a great latent potential for energy savings and environmental protection. The system chooses the padding tower as a dehumidifier and regenerator, which are often used...

  3. Cooling Towers - Energy Conservation and Money Making Mechanisms 

    E-Print Network [OSTI]

    Burger, R.

    1981-01-01T23:59:59.000Z

    The utilization of colder water conserves energy, creates profits, increases product output. In an effort to obtain greater efficiencies and conserve both energy and dollars, all too many engineers neglect the potential of the cooling tower. Many...

  4. Energy Efficiency Evaluation of Guangzhou West Tower Façade System 

    E-Print Network [OSTI]

    Meng, Q.; Zhang, L.

    2006-01-01T23:59:59.000Z

    Guangzhou West Tower is an extremely tall public building. The energy efficiency evaluation of its façade should be different than that of ordinary public buildings. Based on the national code GB50189-2005, “Design Standard for Energy efficiency...

  5. Armor Tower Inc. Notification of Intent to Investigate

    Broader source: Energy.gov (indexed) [DOE]

    Mr. Edward Rosenbloom Chief Executive Officer Armor Tower, Inc. 9 N Main St, 2nd Floor Cortland, New York 13045 Dear Mr. Rosenbloom: This letter serves as notification of the...

  6. The Upgraded D0 detector

    SciTech Connect (OSTI)

    Abazov, V.M.; Abbott, B.; Abolins, M.; Acharya, B.S.; Adams, D.L.; Adams, M.; Adams, T.; Agelou, M.; Agram, J.-L.; Ahmed, S.N.; Ahn, S.H.; Ahsan, M.; Alexeev, G.D.; Alkhazov, G.; Alton, A.; Alverson, G.; Alves, G.A.; Anastasoaie, M.; Andeen, T.; Anderson, J.T.; Anderson, S.; /Buenos Aires U. /Rio de Janeiro, CBPF /Sao Paulo, IFT /Alberta U./Simon Fraser U. /York U., Canada /McGill U. /Beijing, Inst. High Energy Phys. /Hefei, CUST /Andes U., Bogota /Charles U. /Prague, Tech. U. /Prague, Inst. Phys. /San Francisco deQuito U. /Clermont-Ferrand U. /LPSC, Grenoble /Marseille, CPPM /Orsay, LAL /Paris U., VI-VII /DAPNIA, Saclay /Strasbourg, IReS; ,

    2005-07-01T23:59:59.000Z

    The D0 experiment enjoyed a very successful data-collection run at the Fermilab Tevatron collider between 1992 and 1996. Since then, the detector has been upgraded to take advantage of improvements to the Tevatron and to enhance its physics capabilities. We describe the new elements of the detector, including the silicon microstrip tracker, central fiber tracker, solenoidal magnet, preshower detectors, forward muon detector, and forward proton detector. The uranium/liquid-argon calorimeters and central muon detector, remaining from Run I, are discussed briefly. We also present the associated electronics, triggering, and data acquisition systems, along with the design and implementation of software specific to D0.

  7. Variable Frequency AC Drives for Cooling Tower Energy Efficiency

    E-Print Network [OSTI]

    Corey, R. W.

    1982-01-01T23:59:59.000Z

    speed fan drives. Fan speed is reduced to yield specific water temperatures at thermal conditions less difficult than design. The reduced air flow is accomplished by reduced fan power consumption, resulting in optimum cooling tower operation... and economics. Automatic fan speed control by sensing cold water temperature is the economic essence of the application of adjustable frequency power to A-C fan motors. 2.2 Cell Partitions In some multi-cell mechanical-draft cooling towers, the isolation...

  8. Biodiversity Governance: A Tower of Babel of Scales and Cultures

    E-Print Network [OSTI]

    Soberon, Jorge; Peterson, A Townsend

    2015-03-12T23:59:59.000Z

    PERSPECTIVE Biodiversity Governance: A Tower of Babel of Scales and Cultures Jorge Soberón*, A. Townsend Peterson Biodiversity Institute and Department of Ecology and Evolutionary Biology, University of Kansas, Lawrence, Kansas, United States...) explicitly mentions as stakeholders: PLOS Biology | DOI:10.1371/journal.pbio.1002108 March 12, 2015 1 / 5 a11111 OPEN ACCESS Citation: Soberón J, Peterson AT (2015) Biodiversity Governance: A Tower of Babel of Scales and Cultures. PLoS Biol 13(3): e1002108...

  9. Potential Peak Load Reductions From Residential Energy Efficient Upgrades

    E-Print Network [OSTI]

    Meisegeier, D.; Howes, M.; King, D.; Hall, J.

    2002-01-01T23:59:59.000Z

    the potential peak load reductions from residential energy efficiency upgrades in hot and humid climates. First, a baseline scenario is established. Then, the demand and consumption impacts of individual upgrade measures are assessed. Several of these upgrades...

  10. Utility-Scale Power Tower Solar Systems: Performance Acceptance Test Guidelines

    SciTech Connect (OSTI)

    Kearney, D.

    2013-03-01T23:59:59.000Z

    The purpose of these Guidelines is to provide direction for conducting performance acceptance testing for large power tower solar systems that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. The recommendations have been developed under a National Renewable Energy Laboratory (NREL) subcontract and reviewed by stakeholders representing concerned organizations and interests throughout the concentrating solar power (CSP) community. An earlier NREL report provided similar guidelines for parabolic trough systems. These Guidelines recommend certain methods, instrumentation, equipment operating requirements, and calculation methods. When tests are run in accordance with these Guidelines, we expect that the test results will yield a valid indication of the actual performance of the tested equipment. But these are only recommendations--to be carefully considered by the contractual parties involved in the Acceptance Tests--and we expect that modifications may be required to fit the particular characteristics of a specific project.

  11. The Tower Shielding Facility: Its glorious past

    SciTech Connect (OSTI)

    Muckenthaler, F.J.

    1997-05-07T23:59:59.000Z

    The Tower Shielding Facility (TSF) is the only reactor facility in the US that was designed and built for radiation-shielding studies in which both the reactor source and shield samples could be raised into the air to allow measurements to be made without interference from ground scattering or other spurious effects. The TSF proved its usefulness as many different programs were successfully completed. It became active in work for the Defense Atomic Support Agency (DASA) Space Nuclear Auxiliary Power, Defense Nuclear Agency, Liquid Metal Fast Breeder Reactor Program, the Gas-Cooled and High-Temperature Gas-Cooled Reactor programs, and the Japanese-American Shielding Program of Experimental Research, just to mention a few of the more extensive ones. The history of the TSF as presented in this report describes the various experiments that were performed using the different reactors. The experiments are categorized as to the programs which they supported and placed in corresponding chapters. The experiments are described in modest detail, along with their purpose when appropriate. Discussion of the results is minimal, but references are given to more extensive topical reports.

  12. SND data acquisition system upgrade

    E-Print Network [OSTI]

    A. G. Bogdanchikov; V. P. Druzhinin; A. A. Korol; S. V. Koshuba; A. I. Tekutiev; Yu. V. Usov

    2014-04-02T23:59:59.000Z

    The data acquisition (DAQ) system of the SND detector successfully operated during four data-taking seasons (2010-2013) at the e+e- collider VEPP-2000. Currently the collider is shut down for planned reconstruction, which is expected to increase the VEPP-2000 luminosity and data flow from the SND detector electronics by up to 10 times. Since current DAQ system implementation (electronics and computer part) does not have enough reserve for selection of events in the new environment without compromising quality, there arose the need for the system upgrade. Here we report on the major SND data acquisition system upgrade which includes developing new electronics for digitization and data transfer, complete redesign of the data network, increasing of the DAQ computer farm processing capacity and making the event building process concurrent. These measures will allow us to collect data flow from the most congested detector subsystems in parallel in contrast to the current situation. We would like to discuss also the possibility to implement full software trigger solution in the future.

  13. NSTXpool Computer Upgrade December 9, 2010

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    NSTXpool Computer Upgrade WP #1685 Bill Davis December 9, 2010 #12;Work Scope Upgrade Operating System, Application Software, and Programs that run on NSTX computers using Red Hat Enterprise Linux 3. nstxpool computers + nstxops nstxWindowsPC (Control Room Display Wall) Big Blue cluster for EFIT Selected

  14. Project W-420 stack monitoring system upgrades

    SciTech Connect (OSTI)

    CARPENTER, K.E.

    1999-02-25T23:59:59.000Z

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420.

  15. JET neutral beam power upgrade Introduction

    E-Print Network [OSTI]

    JET neutral beam power upgrade Introduction A tokamak is a complex assembly, a system of systems the challenging requirements that fusion demands. The neutral beam heating system and its upgrade for the JET systems) are the main plasma heating scheme on fusion devices such as JET and ITER. The JET neutral beam

  16. Federal Finance Facilities Available for Energy Efficiency Upgrades...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy...

  17. ENERGY STAR Webinar: Financing Energy Efficient Upgrades with...

    Broader source: Energy.gov (indexed) [DOE]

    ENERGY STAR Webinar: Financing Energy Efficient Upgrades with ENERGY STAR ENERGY STAR Webinar: Financing Energy Efficient Upgrades with ENERGY STAR October 21, 2014 2:00PM to...

  18. EECBG Success Story: Energy Efficiency Upgrades Part of Winning...

    Office of Environmental Management (EM)

    Energy Efficiency Upgrades Part of Winning Formula for Oregon School District EECBG Success Story: Energy Efficiency Upgrades Part of Winning Formula for Oregon School District...

  19. PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES | Department...

    Energy Savers [EERE]

    Residential energy upgrade projects typically included: insulation; air and duct sealing; heating, ventilation, and air conditioning (HVAC) upgrades; sunscreens; and solar water...

  20. EIS-0484: Montana-to-Washington Transmission System Upgrade Project...

    Energy Savers [EERE]

    4: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington,...

  1. Sandia National Laboratories: Solar Test Facility Upgrades Complete...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Test Facility Upgrades Complete, Leading to Better Sandia Capabilities to Support Power Industry Solar Test Facility Upgrades Complete, Leading to Better Sandia Capabilities to...

  2. Shared Space vs. In-Unit Upgrades in Multifamily Buildings |...

    Energy Savers [EERE]

    Shared Space vs. In-Unit Upgrades in Multifamily Buildings Shared Space vs. In-Unit Upgrades in Multifamily Buildings Better Buildings Neighborhood Program Multifamily Peer...

  3. Microsoft Word - Lower-MidColumbia-Upgrade-CX.doc

    Broader source: Energy.gov (indexed) [DOE]

    The appearance of tower 197 will also be consistent with the surrounding lattice-steel transmission towers. DOE F 1325.8 e Electronic Form Approved by CGIR - 012095 (8-89)...

  4. QCALT: a tile calorimeter for KLOE-2 upgrade

    E-Print Network [OSTI]

    M. Cordelli; G. Corradi; F. Happacher; M. Martini; S. Miscetti; C. Paglia; A. Saputi; I. Sarra; D. Tagnani

    2009-06-05T23:59:59.000Z

    The upgrade of the DA$\\Phi$NE machine layout requires a modification of the size and position of the inner focusing quadrupoles of KLOE-2 thus asking for the realization of two new calorimeters covering the quadrupoles area. To improve the reconstruction of $K_L\\to 2\\pi^0$ events with photons hitting the quadrupoles a calorimeter with high efficiency to low energy photons (20-300 MeV), time resolution of less than 1 ns and space resolution of few cm, is needed. To match these requirements, we are designing a tile calorimeter, QCALT, where each single tile is readout by mean of SiPM for a total granularity of 2400 channels. We show first tests of the different calorimeter components.

  5. Upgrade of the electron beam ion trap in Shanghai

    SciTech Connect (OSTI)

    Lu, D.; Yang, Y.; Xiao, J.; Shen, Y.; Fu, Y.; Wei, B.; Yao, K.; Hutton, R.; Zou, Y., E-mail: zouym@fudan.edu.cn [The Key Lab of Applied Ion Beam Physics, Ministry of Education, 200433 Shanghai (China); Shanghai EBIT Lab, Institute of Modern Physics, Fudan University, 200433 Shanghai (China)

    2014-09-15T23:59:59.000Z

    Over the last few years the Shanghai electron beam ion trap (EBIT) has been successfully redesigned and rebuilt. The original machine, developed under collaboration with the Shanghai Institute of Applied Physics, first produced an electron beam in 2005. It could be tuned with electron energies between 1 and 130 keV and beam current up to 160 mA. After several years of operation, it was found that several modifications for improvements were necessary to reach the goals of better electron optics, higher photon detection, and ion injection efficiencies, and more economical running costs. The upgraded Shanghai-EBIT is made almost entirely from Ti instead of stainless steel and achieves a vacuum of less than 10{sup ?10} Torr, which helps to minimize the loss of highly changed ions through charge exchange. Meanwhile, a more compact structure and efficient cryogenic system, and excellent optical alignment have been of satisfactory. The magnetic field in the central trap region can reach up till 4.8 T with a uniformity of 2.77 × 10{sup ?4}. So far the upgraded Shanghai-EBIT has been operated up to an electron energy of 151 keV and a beam current of up to 218 mA, although promotion to even higher energy is still in progress. Radiation from ions as highly charged as Xe{sup 53+,} {sup 54+} has been produced and the characterization of current density is estimated from the measured electron beam width.

  6. Beam intensity upgrade at Fermilab

    SciTech Connect (OSTI)

    Marchionni, A.; /Fermilab

    2006-07-01T23:59:59.000Z

    The performance of the Fermilab proton accelerator complex is reviewed. The coming into operation of the NuMI neutrino line and the implementation of slip-stacking to increase the anti-proton production rate has pushed the total beam intensity in the Main Injector up to {approx} 3 x 10{sup 13} protons/pulse. A maximum beam power of 270 kW has been delivered on the NuMI target during the first year of operation. A plan is in place to increase it to 350 kW, in parallel with the operation of the Collider program. As more machines of the Fermilab complex become available with the termination of the Collider operation, a set of upgrades are being planned to reach first 700 kW and then 1.2 MW by reducing the Main Injector cycle time and by implementing proton stacking.

  7. Energy Efficiency Through Lighting Upgrades

    SciTech Connect (OSTI)

    Kara Berst; Maria Howeth

    2010-06-01T23:59:59.000Z

    Lighting upgrades including neon to LED, incandescent to CFL's and T-12 to T-8 and T-5's were completed through this grant. A total of 16 Chickasaw nation facilities decreased their carbon footprint because of these grant funds. Calculations used were based on comparing the energy usage from the previous year�¢����s average and the current energy usage. For facilities without a full year's set of energy bills, the month after installation was compared to the same month from the previous year. Overall, the effect the lighting change-outs had for the gaming centers and casinos far exceeded expectations. For the Madill Gaming Center; both an interior and exterior upgrade was performed which resulted in a 31% decrease in energy consumption. This same reduction was seen in every facility that participated in the grant. Just by simply changing out light bulbs to newer energy efficient equivalents, a decrease in energy usage can be achieved and this was validated by the return on investment seen at Chickasaw Nation facilities. Along with the technical project tasks were awareness sessions presented at Chickasaw Head Starts. The positive message of environmental stewardship was passed down to head start students and passed along to Chickasaw employees. Excitement was created in those that learned what they could do to help reduce their energy bills and many followed through and took the idea home. For a fairy low cost, the general public can also use this technique to lower their energy consumption both at home and at work. Although the idea behind the project was somewhat simple, true benefits have been gained through environmental awareness and reductions of energy costs.

  8. LHCb PID Upgrade Technical Design Report

    E-Print Network [OSTI]

    LHCb Collaboration

    2013-01-01T23:59:59.000Z

    The LHCb upgrade will take place in the second long shutdown of the LHC, currently scheduled to begin in 2018. The upgrade will enable the experiment to run at luminosities of $2 \\times 10^{33}cm^{-2}s^{-1}$ and will read out data at a rate of 40MHz into a exible software-based trigger. All sub-detectors of LHCb will be re-designed to comply with these new operating conditions. This Technical Design Report presents the upgrade plans of the Ring Imaging Cherenkov (RICH) system, the calorimeter system and the muon system, which together provide the particle identication capabilities of the experiment.

  9. Y-12 Industrial Landfill V. Permit application modifications

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    This report contains the modifications in operations and design to meet the Tennessee Department of Environment and Conversation (TDEC) July 10, 1993, amendments to the regulations for Class 2 landfills. These modifications, though extensive in design and construction cost, are considered minor revisions and should not require a processing fee. Area 1 of ILF V, comprising approximately 20% of the ILF V footprint, was designed and submitted to TDEC prior to the implementation of current regulations. This initial area was constructed with a compacted clay liner and leachate collection system, and became operational in April 1994. The current regulations require landfills to have a composite liner with leachate collection system and closure cap. Modifications to upgrade Areas 2 and 3 of ILF V to meet the current TDEC requirements are included.

  10. Permit application modifications

    SciTech Connect (OSTI)

    NONE

    1995-11-01T23:59:59.000Z

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils.

  11. Commissioning Results of the Upgraded Neutralized Drift Compression Experiment

    E-Print Network [OSTI]

    Lidia, S.M.

    2009-01-01T23:59:59.000Z

    COMMISSIONING RESULTS OF THE UPGRADED NEUTRALIZED DRIFTexperiments. We report on commissioning results of the

  12. Nb3Sn Quadrupoles Designs For The LHC Upgrades

    E-Print Network [OSTI]

    Felice, Helene

    2010-01-01T23:59:59.000Z

    progress in order to incorporate all the accelerator quality features required for a LHC upgrade (cooling

  13. Physics at an upgraded proton driver at Fermilab

    SciTech Connect (OSTI)

    Steve Geer

    2004-07-28T23:59:59.000Z

    The accelerator-based particle physics program in the US is entering a period of transition. This is particularly true at Fermilab which for more than two decades has been the home of the Tevatron Proton-Antiproton Collider, the World's highest energy hadron collider. In a few years time the energy frontier will move to the LHC at CERN. Hence, if an accelerator-based program is to survive at Fermilab, it must evolve. Fermilab is fortunate in that, in addition to hosting the Tevatron Collider, the laboratory also hosts the US accelerator-based neutrino program. The recent discovery that neutrino flavors oscillate has opened a new exciting world for us to explore, and has created an opportunity for the Fermilab accelerator complex to continue to address the cutting-edge questions of particle physics beyond the Tevatron Collider era. The presently foreseen neutrino oscillation experiments at Fermilab (MiniBooNE [1] and MINOS [2]) will enable the laboratory to begin contributing to the Global oscillation physics program in the near future, and will help us better understand the basic parameters describing the oscillations. However, this is only a first step. To be able to pin down all of the oscillation parameters, and hopefully make new discoveries along the way, we will need high statistics experiments, which will require a very intense neutrino beam, and one or more very massive detectors. In particular we will require new MW-scale primary proton beams and perhaps ultimately a Neutrino Factory [3]. Plans to upgrade the Fermilab Proton Driver are presently being developed [4]. The upgrade project would replace the Fermilab Booster with a new 8 GeV accelerator with 0.5-2 MW beam power, a factor of 15-60 more than the current Booster. It would also make the modifications needed to the Fermilab Main Injector (MI) to upgrade it to simultaneously provide 120 GeV beams of 2 MW. This would enable a factor of 5-10 increase in neutrino beam intensities at the MI, while also supporting a vigorous 8 GeV fixed-target program. In addition, a Proton Driver might also serve as a stepping-stone to future accelerators, both as an R&D test bed and as an injector, with connections to the Linear Collider, Neutrino Factories, and a VLHC. Hence, although neutrino physics would provide the main thrust for the science program at an upgraded Fermilab proton source, the new facility would also offer exciting opportunities for other fixed-target particle physics (kaons, muons, neutrons, antiprotons, etc.) and a path towards new accelerators in the future.

  14. Advanced Photon Source Upgrade Project - Energy

    ScienceCinema (OSTI)

    Gibson, Murray; Chamberlain, Jeff; Young, Linda

    2013-04-19T23:59:59.000Z

    An upgrade to the Advanced Photon Source (announced by DOE - http://go.usa.gov/ivZ) will help scientists better understand complex environments such as in catalytic reactions.

  15. Economic Options for Upgrading Waste Heat 

    E-Print Network [OSTI]

    Erickson, D. C.

    1983-01-01T23:59:59.000Z

    There are at least six major types of equipment that upgrade waste heat: (1) thermocompressor; (2) electric drive compressor heat pump; (3) absorption heat pump; (4) high temperature heat powered compressor heat pump; (5) reverse absorption heat...

  16. Economic Options for Upgrading Waste Heat

    E-Print Network [OSTI]

    Erickson, D. C.

    1983-01-01T23:59:59.000Z

    There are at least six major types of equipment that upgrade waste heat: (1) thermocompressor; (2) electric drive compressor heat pump; (3) absorption heat pump; (4) high temperature heat powered compressor heat pump; (5) reverse absorption heat...

  17. RECOVERY ACT: TAPOCO PROJECT: CHEOAH UPGRADE

    SciTech Connect (OSTI)

    Tran, Paul; 740, 293 Highway; Baden, NC 28009

    2013-02-28T23:59:59.000Z

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  18. Advanced Photon Source Upgrade Project - Materials

    ScienceCinema (OSTI)

    Gibbson, Murray;

    2013-04-19T23:59:59.000Z

    An upgrade to Advanced Photon Source announced by DOE - http://go.usa.gov/ivZ -- will help scientists break through bottlenecks in materials design in order to develop materials with desirable functions.

  19. ATLAS upgrade June09_v3

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of the upgrade will replace the front end of the ATLAS Positive Ion Injector linac (PII) by a new bunching system, a Radio-Frequency Quadrupole (RFQ) and a new cryostat of...

  20. Upgrade Your Refinery for Energy Conservation

    E-Print Network [OSTI]

    Johnnie, D. H., Jr.; Klooster, H. J.

    1983-01-01T23:59:59.000Z

    Upgrading existing refineries for efficient energy utilization imposes strict restraints upon design engineers. Present and future production requirements must be defined. Reliable operating data must be obtained from historical records and test...

  1. Cooling of hot gases by use of a spray tower 

    E-Print Network [OSTI]

    Pendleton, Elmer Lee

    1958-01-01T23:59:59.000Z

    , These included a sprayhead, number 5B Sprayco, which was located either at the top of the tower (A) or at a position four feet lower in the tower (B), a hot air inlet duct (C), an air outlet duct (D), a multiport gas burner (E), a ceramic checkerwork (F.... ?ne corresnonding m?ss w?s dote?- rrnrei) n-; use ? f su ~ table scales, . ni balances. Thc spec? f? cat iona I' or :j i'- ei' 'one. ? !'. )nws: ? ncp, a! i ' sty . ? i at?i. 'Fl. ? t"nr v: . , c ie. , " F. nu=rc. ured cy Can, " c? 0?ubdzv...

  2. Comparison of Second Wind Triton Data with Meteorological Tower Measurements

    SciTech Connect (OSTI)

    Scott, G.; Elliott, D.; Schwartz, M.

    2010-02-01T23:59:59.000Z

    With the increased interest in remote sensing of wind information in recent years, it is important to determine the reliability and accuracy of new wind measurement technologies if they are to replace or supplement conventional tower-based measurements. In this study, we present the results of an analysis characterizing the measurement performance of a state-of-the-art SOund Detection And Ranging (sodar) device when compared to a high-quality tower measurement program. Second Wind Inc. (Somerville, MA, USA) provided NREL with more than six months of data from a measurement program conducted near an operating wind farm in western Texas.

  3. D0 Silicon Upgrade: Upgrade Piping Loads on Cleanroom Roof

    SciTech Connect (OSTI)

    Sakla, Steve; /Fermilab

    1995-08-28T23:59:59.000Z

    The proposed piping layout for the DO upgrade will run along the south wall of DAB. The cryogenic service pipe runs above the upper and lower cleanroom roofs and will need to be supported by the roofs beams. Calculations were done to determine the stresses in the I-beams created by the existing and additional loads due to the upgrade. Refer to drawing no. 3823.115-ME-317283 for drawings of the piping layout. Figure 1 shows the 'plan view' portion of this drawing. The weight of the individual lines were calculated in figure 2 assuming a pipe density of O.28 lbm/in{sup 3} for stainless steel (0.12% C) and a fluid density (assuming LN2 at 1 atm) of 0.03 lbm/in{sup 3}. The weights of the corrugated steel flooring, assembly hall feed cans, support beams, and roof hatch were also included in the analysis. These loads are calculated on pgs. 5-6. A floor load of 50 lbf/ft{sup 2} was also added in order to maintain the existing floor load limit in addition to the added piping loads. Measurements of the dimensions of the I-beams determined that the nominal sizes of the beams were W8 x 21 for the lower roof and W14 x 26 for the upper roof. Pipe lengths were determined from the drawing for each of the lines on pgs. 1-2 of the calculations (refer to all piping by line numbers according to figure 2). A total weight was calculated for lines 3-9 along the south wall and lines 1-2 running along the north wall of the lower cleanroom roof. To simplify the calculations these weights were assumed to be evenly distributed on the 5 I-beam supports of the lower cleanroom roof 2.5 feet in from the south wall. The stress analysis was done using FrameMac, a 2-D finite element program for the Macintosh. Beam 3 was not included in the analysis because it is structurally equivalent to beam 1. The program outputted maximum values for shear stress, bending stress, shear force, and moments in each of the beams analyzed. These values were then compared to the allowable stresses as per the specifications and codes stated in the AISC: Manual of Steel Construction. The stresses on the roof beams needed to be determined in a number of different places. The first was in the beam itself which included the flange and web sections. The second place was at the ends of the beams where the flanges were removed to make the perpendicular connections to the other beams on the lower roof. The final point was the framed beam connection which included the bolt analysis. FrameMac calculated stresses only for the beams which included the sections where the flanges were removed to make the end connections. To analyze the connections, the allowable bending and shear stresses were solved for allowable shear and moments. This was done because FrameMac does not have the capability to analyze the dimensions for the bolts and angles used in the connections were known and the program outputted values for reaction forces and moments at the ends of the beams. Multiplying the allowable shear stress for the bolts and angle connections by their respective areas gave the allowable shear force. The allowable moment for the angle connection was calculated by multiplying the section modulus of the angle by the allowable bending stress. These allowable loads are calculated on pgs. 7-8. The allowable and maximum calculated stresses by FrameMac are summarized in a table. In conclusion, the cleanroom roofs will be able to safely support the weight of the upgrade cryogenic piping, feed cans, corrugated flooring and a 50 lbf/ft{sup 2} floor load with the addition of diagonal braces at the ends of beams 1,2,3,4, and 8. The location and size of these diagonal braces are shown in fig. 4. Also, the piping supports and feed cans will all need to be placed directly above the I-beam supports. These supports will consist of unistrut structures that will be detailed and specified separate to this analysis. The output and input data from FrameMac and the drawings used in the analysis follow the calculation pages.

  4. The Tower of Hanoi and Finite Automata Jean-Paul Allouche and J. Shallit

    E-Print Network [OSTI]

    Shallit, Jeffrey O.

    The Tower of Hanoi and Finite Automata Jean-Paul Allouche and J. Shallit Abstract Some of the algorithms for solving the Tower of Hanoi puzzle can be applied "with eyes closed" or "without memory". Here we survey the solution for the classical tower of Hanoi that uses finite automata, as well as some

  5. UT tower goes dark to conserve energy by KVUE.com

    E-Print Network [OSTI]

    Johnston, Daniel

    UT tower goes dark to conserve energy by KVUE.com Posted on November 22, 2013 at 5:12 PM Updated, but the first time the tower turned off its lights for the initiative. In previous initiatives, the UT Energy Friday, Nov 22 at 5:51 PM AUSTIN -- The University of Texas tower will remain unlit Friday night

  6. Radiometric Modeling of Mechanical Draft Cooling Towers to Assist in the Extraction of their Absolute Temperature

    E-Print Network [OSTI]

    Salvaggio, Carl

    of Mechanical Draft Cooling Towers to Assist in the Extraction of their Absolute Temperature from Remote Thermal Abstract Determination of the internal temperature of a mechanical draft cooling tower (MDCT) from remotelyRadiometric Modeling of Mechanical Draft Cooling Towers to Assist in the Extraction

  7. P9.5 THERMOCOUPLE TEMPERATURE MEASUREMENTS FROM THE CASES-99 MAIN TOWER

    E-Print Network [OSTI]

    Burns, Sean

    P9.5 THERMOCOUPLE TEMPERATURE MEASUREMENTS FROM THE CASES-99 MAIN TOWER Sean P. Burns #3-m tower located east of Leon, Kansas (latitude 37 Æ 38.88'N, lon- gitude 96 Æ 44.14'W). These data aspirated, slow-response tem- perature sensors maintained by ATD on the tower. These air temperature

  8. IMU Activities Tower Application and Contract 1 Indiana Memorial Union, Room 270

    E-Print Network [OSTI]

    Indiana University

    IMU Activities Tower Application and Contract 1 Indiana Memorial Union, Room 270 Bloomington space in the Student Activities Tower of the Indiana Memorial Union to student organizations registered Board office--located on the second floor of the Student Activities Tower-- IMU Room 270. Even if you

  9. The Ivory Tower: the history of a figure of speech and its cultural uses

    E-Print Network [OSTI]

    Shapin, Steven

    The Ivory Tower: the history of a figure of speech and its cultural uses STEVEN SHAPIN* Abstract. This is a historical survey of how and why the notion of the Ivory Tower became part of twentieth- and twenty in the ancient debate between the active and contemplative lives. Holy ivory There never was an Ivory Tower

  10. THE GOODWILLIE TOWER OF THE IDENTITY IS A GREG ARONE AND MARJA KANKAANRINTA

    E-Print Network [OSTI]

    Bielefeld, University of

    THE GOODWILLIE TOWER OF THE IDENTITY IS A LOGARITHM GREG ARONE AND MARJA KANKAANRINTA April 6, 1995 Abstract. We offer the point of view that the Goodwillie tower of the identity functor is a formal inverse The Goodwillie tower of the identity (see [2, 3, 4] for a general reference on the Goodwillie calculus

  11. The Use of Tall Tower Field Data for Estimating Wind Turbine Power Performance , J. Chapman1

    E-Print Network [OSTI]

    Manuel, Lance

    The Use of Tall Tower Field Data for Estimating Wind Turbine Power Performance A. Swift1 , J data acquisition tower is continuously measuring and recording atmospheric conditions at multiple providing barometric pressure and temperature data. A second data acquisition tower approximately 100m

  12. Airport Tower Automation With the construction of Bergstrom International Airport in South Austin, the FAA has

    E-Print Network [OSTI]

    Browne, James C.

    Airport Tower Automation With the construction of Bergstrom International Airport in South Austin, air traffic pattern, and incoming airplanes. The control system will be called the "tower. Collisions most often occur during take-offs or landings, so the tower must ensure proper spacing between

  13. Blandford MTA Tower Wind Monitoring This document provides information not repeated in the monthly wind monitoring

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    Blandford MTA Tower Wind Monitoring This document provides information not repeated in the monthly on the Massachusetts Turnpike Authority (MTA) tower at Blandford. A wind vane and two anemometers are located at two heights on the tower: 60 m and 40 m. Details of the equipment and models are: · NRG model Symphonie

  14. Semistable Models of Curves Resolution of singularities on the tower of modular

    E-Print Network [OSTI]

    Semistable Models of Curves Resolution of singularities on the tower of modular curves Jared on the tower of modular curves #12;Semistable Models of Curves Semistable models: Definition Let R Resolution of singularities on the tower of modular curves #12;Semistable Models of Curves Semistable models

  15. School of Dentistry Skourtes Tower: named $10 million 200-Seat Auditorium: named $500,000

    E-Print Network [OSTI]

    Chapman, Michael S.

    School of Dentistry Skourtes Tower: named $10 million 200-Seat Auditorium: named $500,000 Floor 1 Tower Floor 8: Pre-doctoral Clinic Space: named $5 million Pre-Doctoral Integrated Group (IGP) Practices $75,000 Skourtes Tower Floor 9: Pre-doctoral Clinic Space: named $5 million Pre-doctoral Integrated

  16. Marion Meteorological Tower Wind Monitoring This document provides information not repeated in the monthly wind monitoring

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    Marion Meteorological Tower Wind Monitoring This document provides information not repeated on the meteorological tower at Marion: Great Hill Dairy. A wind vane and two anemometers are located at two heights on the tower: 50 m and 38 m. Details of the equipment and models are: · NRG model Symphonie Cellogger · 4 ­ #40

  17. Estimation of advective fluxes from CO2 flux profile observations at the Cabauw Tower

    E-Print Network [OSTI]

    Stoffelen, Ad

    Estimation of advective fluxes from CO2 flux profile observations at the Cabauw Tower Kasper O profile observations at the Cabauw Tower Version 1.0 Date April 2012 Status Final #12;#12;Estimation of Advective Fluxes from CO2 Flux Profile Observations at the Cabauw Tower Master of Science Thesis Kasper O

  18. Impact of Wind Shear and Tower Shadow Effects on Power System with Large Scale Wind Power

    E-Print Network [OSTI]

    Hu, Weihao

    Impact of Wind Shear and Tower Shadow Effects on Power System with Large Scale Wind Power to wind speed variations, the wind shear and the tower shadow effects. The fluctuating power may be ableSILENT/PowerFactory. In this paper, the impacts of wind shear and tower shadow effects on the small signal stability of power systems

  19. THE TOWER FOUNDATION OF SAN JOSE STATE UNIVERSITY Procurement Card Application

    E-Print Network [OSTI]

    Eirinaki, Magdalini

    THE TOWER FOUNDATION OF SAN JOSE STATE UNIVERSITY Procurement Card Application CARDHOLDER card is lost or stolen, I will notify the Tower Foundation immediately. I will surrender my Procurement Card to Tower Foundation upon termination of employment or upon reallocation of duties which do

  20. 654revision:2000-01-30modified:2000-02-01 THE AUTOMORPHISM TOWER PROBLEM REVISITED

    E-Print Network [OSTI]

    Shelah, Saharon

    654revision:2000-01-30modified:2000-02-01 THE AUTOMORPHISM TOWER PROBLEM REVISITED WINFRIED JUST, SAHARON SHELAH, AND SIMON THOMAS Abstract. It is well-known that the automorphism towers of infinite) = 1. In particular, Aut G is also a centreless group. This enables us to define the automorphism tower

  1. Summer 2014 A publication of the OHSU School of Dentistry Alumni Association Hello, Skourtes Tower

    E-Print Network [OSTI]

    Chapman, Michael S.

    Summer 2014 A publication of the OHSU School of Dentistry Alumni Association Hello, Skourtes Tower are securely into our new space, the Skourtes Tower OHSU School of Dentistry in the Collaborative Life Sciences. The Skourtes Tower facility is going to match the quality of our faculty and students, and it is going

  2. THE AUTOMORPHISM TOWER PROBLEM REVISITED WINFRIED JUST, SAHARON SHELAH, AND SIMON THOMAS

    E-Print Network [OSTI]

    Thomas, Simon

    THE AUTOMORPHISM TOWER PROBLEM REVISITED WINFRIED JUST, SAHARON SHELAH, AND SIMON THOMAS Abstract.It is well-known that the automorphism towers of infinite centr* *e Gffwith InnGffvia the natural embedding.) The automorphism tower is said to terminate if there exists

  3. Overcoming the Boundary Layer Turbulence at Dome C: Ground-Layer Adaptive Optics versus Tower

    E-Print Network [OSTI]

    Ashley, Michael C. B.

    Overcoming the Boundary Layer Turbulence at Dome C: Ground-Layer Adaptive Optics versus Tower T the boundary layer: mounting a telescope on a tower that physically puts it above the turbulent layer such a goal, two solutions can be proposed. The most intuitive one is to place a telescope on a tower

  4. Data Center Economizer Cooling with Tower Water; Demonstration of a

    E-Print Network [OSTI]

    LBNL-6660E Data Center Economizer Cooling with Tower Water; Demonstration of a Dual Heat Exchanger program and by the Assistant Secretary for Energy Efficiency and Renewable Energy, Building Technologies heat exchangers was demonstrated to illustrate an energy efficient cooling capability. This unique

  5. Solar Power Tower Design Basis Document, Revision 0

    SciTech Connect (OSTI)

    ZAVOICO,ALEXIS B.

    2001-07-01T23:59:59.000Z

    This report contains the design basis for a generic molten-salt solar power tower. A solar power tower uses a field of tracking mirrors (heliostats) that redirect sunlight on to a centrally located receiver mounted on top a tower, which absorbs the concentrated sunlight. Molten nitrate salt, pumped from a tank at ground level, absorbs the sunlight, heating it up to 565 C. The heated salt flows back to ground level into another tank where it is stored, then pumped through a steam generator to produce steam and make electricity. This report establishes a set of criteria upon which the next generation of solar power towers will be designed. The report contains detailed criteria for each of the major systems: Collector System, Receiver System, Thermal Storage System, Steam Generator System, Master Control System, and Electric Heat Tracing System. The Electric Power Generation System and Balance of Plant discussions are limited to interface requirements. This design basis builds on the extensive experience gained from the Solar Two project and includes potential design innovations that will improve reliability and lower technical risk. This design basis document is a living document and contains several areas that require trade-studies and design analysis to fully complete the design basis. Project- and site-specific conditions and requirements will also resolve open To Be Determined issues.

  6. Performance characteristics of an induced draft, counterflow, spray cooling tower

    E-Print Network [OSTI]

    Jones, Charles Edward

    1951-01-01T23:59:59.000Z

    in Figuno 1. These entrance bells wore previously calibrated. by means of the pitot tube traverse method. Air flow mct r pressure readings were obtained by means of inclined . " aft gages graduated to 3. 31 inch of' water. Air was drawn through the tower...

  7. Multi-objective optimization of solar tower heliostat fields

    E-Print Network [OSTI]

    Ábrahám, Erika

    the heat. Usually, the heat of the fluid is exchanged into steam which powers a turbine to generate Introduction Solar tower plants generate electric power from sunlight by focusing concentrated solar radiation. Designing commercial power plants aims always at finding the most economic plant design under a given set

  8. The Postnikov tower in motivic stable homotopy theory

    E-Print Network [OSTI]

    's slice tower #12;Categories of spaces Fix a field k (perfect?). · Spc := the category of simplicial sets: "spaces". · Spc(k) := the category of presheaves of spaces on Sm/k: "spaces over k". · Pointed versions Spc, Spc(k). Spc Spc(k): S "constant presheaf" S. Sm/k Spc(k): X "representable presheaf" Y Hom

  9. 800mm luxury : pencil tower phenomenon in Hong Kong, China

    E-Print Network [OSTI]

    Yam, Hiu Lan

    2012-01-01T23:59:59.000Z

    150m2 - 40m2 - 60m3. Pencil Towers are slender pencil-like apartment buildings. They are commonly found in high-dense Asian cities such as Hong Kong, Tokyo and Singapore. Focusing on Hong Kong as the context of research, ...

  10. IPNS upgrade: A feasibility study

    SciTech Connect (OSTI)

    NONE

    1995-04-01T23:59:59.000Z

    Many of Argonne National Laboratory`s (ANL`s) scientific staff members were very active in R&D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R&D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL`s Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately.

  11. The Leaning Tower illusion: a new illusion of perspectiveThe Leaning Tower illusion: a new illusion of perspective We would like to describe a new illusion of perspective that to our knowledge has

    E-Print Network [OSTI]

    Kingdom, Frederick A. A.

    The Leaning Tower illusion: a new illusion of perspectiveThe Leaning Tower illusion: a new illusion reported before. Figure 1 shows two images of the Leaning Tower of Pisa placed next to one another. One obtains a strong impression that the tower on the right leans more, as if photographed from a different

  12. Climate balance of biogas upgrading systems

    SciTech Connect (OSTI)

    Pertl, A., E-mail: andreas.pertl@boku.ac.a [Institute of Waste Management, Department of Water, Atmosphere and Environment, University of Natural Resources and Applied Life Sciences, Vienna, Muthgasse 107, A-1190 Wien (Austria); Mostbauer, P.; Obersteiner, G. [Institute of Waste Management, Department of Water, Atmosphere and Environment, University of Natural Resources and Applied Life Sciences, Vienna, Muthgasse 107, A-1190 Wien (Austria)

    2010-01-15T23:59:59.000Z

    One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading) method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO{sub 2}.

  13. Manuscript received for review, February 2008; accepted for publication, SIX CENTURIES OF FIRE HISTORY AT DEVILS TOWER

    E-Print Network [OSTI]

    Stambaugh, Michael C

    OF FIRE HISTORY AT DEVILS TOWER NATIONAL MONUMENT WITH COMMENTS ON REGIONWIDE TEMPERATURE INFLUENCE-0985 ABSTRACT--This study documents over six centuries of historic fire events at Devils Tower National Monu­climate relationships derived from Devils Tower, the Black Hills, and other Great Plains sites suggest that Devils Tower

  14. MAVIS III -- A Windows 95/NT Upgrade

    SciTech Connect (OSTI)

    Hardwick, M.F. [Sandia National Labs., Livermore, CA (United States). GTS Engineering Dept.

    1997-12-01T23:59:59.000Z

    MAVIS (Modeling and Analysis of Explosive Valve Interactions) is a computer program that simulates operation of explosively actuated valve. MAVIS was originally written in Fortran in the mid 1970`s and was primarily run on the Sandia Vax computers in use through the early 1990`s. During the mid to late 1980`s MAVIS was upgraded to include the effects of plastic deformation and it became MAVIS II. When the Vax computers were retired, the Gas Transfer System (GTS) Development Department ported the code to the Macintosh and PC platforms, where it ran as a simple console application. All graphical output was lost during these ports. GTS code developers recently completed an upgrade that provides a Windows 95/NT MAVIS application and restores all of the original graphical output. This upgrade is called MAVIS III version 1.0. This report serves both as a user`s manual for MAVIS III v 1.0 and as a general software development reference.

  15. Bitumen and heavy oil upgrading in Canada

    SciTech Connect (OSTI)

    Chrones, J.

    1988-06-01T23:59:59.000Z

    A review is presented of the heavy oil upgrading industry in Canada. Up to now it has been based on the processing of bitumen extracted from oil sands mining operations at two sites, to produce a residue-free, low sulfur, synthetic crude. Carbon rejection has been the prime process technology with delayed coking being used by Suncor and FLUID COKING at Syncrude. Alternative processes for recovering greater amounts of synthetic crude are examined. These include a variety of hydrogen addition processes and combinations which produce pipelineable materials requiring further processing in downstream refineries with expanded capabilities. The Newgrade Energy Inc. upgrader, now under construction in Regina, will use fixed-bed, catalytic, atmospheric-residue, hydrogen processing. Two additional products, also based on hydrogenation, will use ebullated bed catalyst systems: the expansion of Syncrude, now underway, is using the LC Fining Process whereas the announced Husky Bi-Provincial upgrader is based on H-Oil.

  16. Bitumen and heavy oil upgrading in Canada

    SciTech Connect (OSTI)

    Chrones, J. (Chrones Engineering Consultants Inc., 111 Lord Seaton Road, Willowdale, Ontario (CA)); Germain, R.R. (Alberta Oil Sands Technology and Research Authority, Edmonton, AB (Canada))

    1989-01-01T23:59:59.000Z

    A review is presented of the heavy oil upgrading industry in Canada. Up to now it has been based on the processing of bitumen extracted from oil sands mining operations at two sites, to produce a residue-free, low sulphur, synthetic crude. Carbon rejection has been the prime process technology with delayed coking being used by Suncor and FLUID COKING at Syncrude. Alternative processes for recovering greater amounts of synthetic crude are examined. These include a variety of hydrogen addition processes and combinations which produce pipelineable materials requiring further processing in downstream refineries with expanded capabilities. The Newgrade Energy Inc. upgrader now under construction in Regina, will use fixed-bed, catalytic, atmospheric-residue, hydrogen processing. Two additional projects, also based on hydrogenation, will use ebullated bed catalyst systems; the expansion of Syncrude, now underway, is using the LC Fining Process whereas the announced Husky Bi-Provincial upgrader is based on H-Oil.

  17. Vibration Response Testing of the CEBAF 12GeV Upgrade Cryomodules

    SciTech Connect (OSTI)

    Davis, G. Kirk; Matalevich, Joseph R.; Wiseman, Mark A.; Powers, Thomas J.

    2012-09-01T23:59:59.000Z

    The CEBAF 12 GeV upgrade project includes 80 new 7-cell cavities to form 10 cryomodules. These cryomodules were tested during production to characterize their microphonic response in situ. For several early cryomodules, detailed (vibration) modal studies of the cryomodule string were performed during the assembly process to identify the structural contributors to the measured cryomodule microphonic response. Structural modifications were then modelled, implemented, and verified by subsequent modal testing and in-situ microphonic response testing. Interim and latest results from this multi-stage process will be reviewed.

  18. Upgrading : an alternative approach towards housing reform in China

    E-Print Network [OSTI]

    He, Fang, 1956-

    1989-01-01T23:59:59.000Z

    The thesis is a study on urban housing upgrading in China. The main objective is to look at upgrading, which has been widely used in many developing countries, as an alternative approach to solving the existing urban housing ...

  19. Idaho: Nez Perce Tribe Energy-Efficient Facilities Upgrade |...

    Energy Savers [EERE]

    Idaho: Nez Perce Tribe Energy-Efficient Facilities Upgrade Idaho: Nez Perce Tribe Energy-Efficient Facilities Upgrade November 8, 2013 - 12:00am Addthis Utilizing 67,000 of EERE's...

  20. Jefferson Lab's upgraded Free-Electron Laser produces first ligh...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Navy's goals and expectations and we expect no less from the upgraded FEL." The Free-Electron Laser upgrade project is funded by the Department of Defense's Office of...

  1. Automatic Software Upgrades for Distributed Systems (PhD thesis)

    E-Print Network [OSTI]

    Ajmani, Sameer

    2005-10-06T23:59:59.000Z

    Upgrading the software of long-lived, highly-available distributedsystems is difficult. It is not possible to upgrade all the nodes in asystem at once, since some nodes may be unavailable and halting thesystem for an ...

  2. Heavy Oil Upgrading from Electron Beam (E-Beam) Irradiation 

    E-Print Network [OSTI]

    Yang, Daegil

    2011-02-22T23:59:59.000Z

    hydrocarbons. Second, we studied the energy transfer mechanism of E-Beam upgrading to optimize the process. Third, we conducted a preliminary economic analysis based on energy consumption and compared the economics of E-Beam upgrading with conventional...

  3. Advanced Photon Source Upgrade —Creating a Better Quality of Life

    SciTech Connect (OSTI)

    Linda Young

    2012-11-05T23:59:59.000Z

    The upgrade will enable ultrafast X-ray pulses that could point the way to more efficient electronics and vehicles.

  4. Investment and Upgrade in Distributed Generation under Uncertainty

    E-Print Network [OSTI]

    Siddiqui, Afzal

    2008-01-01T23:59:59.000Z

    utility tari?s, the electricity price may be revised only Investment and Upgrade in Distributed Generation

  5. The Jefferson Lab 12 GeV Upgrade

    E-Print Network [OSTI]

    McKeown, R D

    2010-01-01T23:59:59.000Z

    Construction of the 12 GeV upgrade to the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Facility is presently underway. This upgrade includes doubling the energy of the electron beam to 12 GeV, the addition of a new fourth experimental hall, and the construction of upgraded detector hardware. An overview of this upgrade project is presented, along with highlights of the anticipated experimental program.

  6. The Jefferson Lab 12 GeV Upgrade

    E-Print Network [OSTI]

    R. D. McKeown

    2010-09-22T23:59:59.000Z

    Construction of the 12 GeV upgrade to the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Facility is presently underway. This upgrade includes doubling the energy of the electron beam to 12 GeV, the addition of a new fourth experimental hall, and the construction of upgraded detector hardware. An overview of this upgrade project is presented, along with highlights of the anticipated experimental program.

  7. Structure of Magnetic Tower Jets in Stratified Atmospheres

    E-Print Network [OSTI]

    Masanori Nakamura; Hui Li; Shengtai Li

    2006-08-15T23:59:59.000Z

    Based on a new approach on modeling the magnetically dominated outflows from AGNs (Li et al. 2006), we study the propagation of magnetic tower jets in gravitationally stratified atmospheres (such as a galaxy cluster environment) in large scales ($>$ tens of kpc) by performing three-dimensional magnetohydrodynamic (MHD) simulations. We present the detailed analysis of the MHD waves, the cylindrical radial force balance, and the collimation of magnetic tower jets. As magnetic energy is injected into a small central volume over a finite amount of time, the magnetic fields expand down the background density gradient, forming a collimated jet and an expanded ``lobe'' due to the gradually decreasing background density and pressure. Both the jet and lobes are magnetically dominated. In addition, the injection and expansion produce a hydrodynamic shock wave that is moving ahead of and enclosing the magnetic tower jet. This shock can eventually break the hydrostatic equilibrium in the ambient medium and cause a global gravitational contraction. This contraction produces a strong compression at the head of the magnetic tower front and helps to collimate radially to produce a slender-shaped jet. At the outer edge of the jet, the magnetic pressure is balanced by the background (modified) gas pressure, without any significant contribution from the hoop stress. On the other hand, along the central axis of the jet, hoop stress is the dominant force in shaping the central collimation of the poloidal current. The system, which possesses a highly wound helical magnetic configuration, never quite reaches a force-free equilibrium state though the evolution becomes much slower at late stages. The simulations were performed without any initial perturbations so the overall structures of the jet remain mostly axisymmetric.

  8. The JLAB 12 GeV Energy Upgrade of CEBAF

    SciTech Connect (OSTI)

    Harwood, Leigh H. [JLAB

    2013-12-01T23:59:59.000Z

    This presentation should describe the progress of the 12GeV Upgrade of CEBAF at Jefferson Lab. The status of the upgrade should be presented as well as details on the construction, procurement, installation and commissioning of the magnet and SRF components of the upgrade.

  9. Guidelines for Home Energy Upgrade Professionals: Standard Work Specifications for Multifamily Energy Upgrades (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-08-01T23:59:59.000Z

    This fact sheet provides essential information about the 2011 publication of the Workforce Guidelines for Multifamily Home Energy Upgrades, including their origin, their development with the help of industry leaders to create the standard work specifications for retrofit work.

  10. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project Subtotal 888 03MAY10A 03: Period of Performance: $949 Control Account Manager: Revision #: Revision Date: July-11 Authorized Work Budget: Labik Approvals Signature Date NSTX-U Project Manager R. Strykowsky 4- WBS Dictionary sheet

  11. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project Subtotal 500 01OCT12 01: Period of Performance: $1,174 Control Account Manager: Revision #: Revision Date: July-11 Authorized Work 2014 Authorized Budget: Perry Functional Manager L. Dudek Approvals Signature Date NSTX-U Project

  12. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Cost n n % PPCTe B Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project: Period of Performance: $251 Control Account Manager: Revision #: Revision Date: July-11 Authorized Work Description: Attachments: ECP# Implement Date Prior Budget New Budget Name Control Account Manager Titus

  13. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Cost n n % PPCTe B Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project: Period of Performance: $4,516 Control Account Manager: Revision #: Revision Date: July-11 Authorized Work Description: Attachments: ECP# Implement Date Prior Budget New Budget Name Control Account Manager Denault

  14. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project Subtotal 1,401 23FEB09A: Period of Performance: $2,984 Control Account Manager: Revision #: Revision Date: July-11 Authorized Work Account Manager Stevenson Functional Manager M.Williams Approvals Signature Date NSTX-U Project Manager R

  15. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Cost n n % PPCTe B Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project: Period of Performance: $102 Control Account Manager: Revision #: Revision Date: July-11 Authorized Work Description: Attachments: ECP# Implement Date Prior Budget New Budget Name Control Account Manager Blanchard

  16. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Cost n n % PPCTe B Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project: Period of Performance: $442 Control Account Manager: Revision #: Revision Date: CLOSED Authorized Work Description: Attachments: ECP# Implement Date Prior Budget New Budget Name Control Account Manager Chrzanowski

  17. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project Subtotal 1,401 23FEB09A: Period of Performance: $3,335 Control Account Manager: Revision #: Revision Date: July-11 Authorized Work Description: Attachments: ECP# Implement Date Prior Budget New Budget Name Control Account Manager Raki

  18. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project Subtotal 1,240 23FEB09A: Period of Performance: $2,260 Control Account Manager: Revision #: Revision Date: July-11 Authorized Work Description: Attachments: ECP# Implement Date Prior Budget New Budget Name Control Account Manager Denault

  19. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project Subtotal 1,366 23FEB09A: Period of Performance: $1,860 Control Account Manager: Revision #: Revision Date: July-11 Authorized Work Description: Attachments: ECP# Implement Date Prior Budget New Budget Name Control Account Manager Denault

  20. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    % PPCTe B Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project Subtotal 1: Period of Performance: $3,618 Control Account Manager: Revision #: Revision Date: July-11 Authorized Work Description: Attachments: ECP# Implement Date Prior Budget New Budget Name Control Account Manager Perry

  1. Preparation for upgrading western subbituminous coal

    SciTech Connect (OSTI)

    Grimes, R.W.; Cha, C.Y.; Sheesley, D.C.

    1990-11-01T23:59:59.000Z

    The objective of this project was to establish the physical and chemical characteristics of western coal and determine the best preparation technologies for upgrading this resource. Western coal was characterized as an abundant, easily mineable, clean, low-sulfur coal with low heating value, high moisture, susceptibility to spontaneous ignition, and considerable transit distances from major markets. Project support was provided by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The research was conducted by the Western Research Institute, (WRI) in Laramie, Wyoming. The project scope of work required the completion of four tasks: (1) project planning, (2) literature searches and verbal contacts with consumers and producers of western coal, (3) selection of the best technologies to upgrade western coal, and (4) identification of research needed to develop the best technologies for upgrading western coals. The results of this research suggest that thermal drying is the best technology for upgrading western coals. There is a significant need for further research in areas involving physical and chemical stabilization of the dried coal product. Excessive particle-size degradation and resulting dustiness, moisture reabsorption, and high susceptibility to spontaneous combustion are key areas requiring further research. Improved testing methods for the determination of equilibrium moisture and susceptibility to spontaneous ignition under various ambient conditions are recommended.

  2. UPGRADES TO Monteburns, VERSION 3.0

    SciTech Connect (OSTI)

    Galloway, Jack D [Los Alamos National Laboratory; Trellue, Holly R [Los Alamos National Laboratory

    2012-06-22T23:59:59.000Z

    Monteburns VERSION 3.0 is an upgrade of the existing Monteburns code available through RSICC. The new version includes modern programming style, increased parallel computing, more accurate capture gamma calculations and an automated input generator. This capability was demonstrated through a small PWR core simulation.

  3. T-Farm complex alarm upgrades

    SciTech Connect (OSTI)

    Roberts, J.B.

    1995-01-01T23:59:59.000Z

    The alarm and controls associated with the T, TX, and TY farms are located in the 242-T control room. The design data for replacement and upgrades of the alarm panels is in this document. This task was canceled previous to the 90% design review point.

  4. Testing of FMI's Coal Upgrading Process

    SciTech Connect (OSTI)

    Vijay Sethi

    2009-03-21T23:59:59.000Z

    WRI and FMI have collaborated to develop and test a novel coal upgrading technology. Proprietary coal upgrading technology is a fluidized bed-based continuous process which allows high through-puts, reducing the coal processing costs. Processing is carried out under controlled oxidizing conditions at mild enough conditions that compared to other coal upgrading technologies; the produced water is not as difficult to treat. All the energy required for coal drying and upgrading is derived from the coal itself. Under the auspices of the Jointly Sponsored Research Program, Cooperative Agreement DE-FC26-98FT40323, a nominal 400 lbs/hour PDU was constructed and operated. Over the course of this project, several low-rank coals were successfully tested in the PDU. In all cases, a higher Btu, low moisture content, stable product was produced and subsequently analyzed. Stack emissions were monitored and produced water samples were analyzed. Product stability was established by performing moisture readsorption testing. Product pyrophobicity was demonstrated by instrumenting a coal pile.

  5. High Flux Isotopes Reactor (HFIR) Cooling Towers Demolition Waste Management

    SciTech Connect (OSTI)

    Pudelek, R. E.; Gilbert, W. C.

    2002-02-26T23:59:59.000Z

    This paper describes the results of a joint initiative between Oak Ridge National Laboratory, operated by UT-Battelle, and Bechtel Jacobs Company, LLC (BJC) to characterize, package, transport, treat, and dispose of demolition waste from the High Flux Isotope Reactor (HFIR), Cooling Tower. The demolition and removal of waste from the site was the first critical step in the planned HFIR beryllium reflector replacement outage scheduled. The outage was scheduled to last a maximum of six months. Demolition and removal of the waste was critical because a new tower was to be constructed over the old concrete water basin. A detailed sampling and analysis plan was developed to characterize the hazardous and radiological constituents of the components of the Cooling Tower. Analyses were performed for Resource Conservation and Recovery Act (RCRA) heavy metals and semi-volatile constituents as defined by 40 CFR 261 and radiological parameters including gross alpha, gross beta, gross gamma, alpha-emitting isotopes and beta-emitting isotopes. Analysis of metals and semi-volatile constituents indicated no exceedances of regulatory limits. Analysis of radionuclides identified uranium and thorium and associated daughters. In addition 60Co, 99Tc, 226Rm, and 228Rm were identified. Most of the tower materials were determined to be low level radioactive waste. A small quantity was determined not to be radioactive, or could be decontaminated. The tower was dismantled October 2000 to January 2001 using a detailed step-by-step process to aid waste segregation and container loading. The volume of waste as packaged for treatment was approximately 1982 cubic meters (70,000 cubic feet). This volume was comprised of plastic ({approx}47%), wood ({approx}38%) and asbestos transite ({approx}14%). The remaining {approx}1% consisted of the fire protection piping (contaminated with lead-based paint) and incidental metal from conduit, nails and braces/supports, and sludge from the basin. The waste, except for the asbestos, was volume reduced via a private contract mechanism established by BJC. After volume reduction, the waste was packaged for rail shipment. This large waste management project successfully met cost and schedule goals.

  6. Upgrade of CEBAF from 6 Gev To 12 Gev: Status

    SciTech Connect (OSTI)

    Harwood, Leigh [Jefferson Lab, 12000 Jefferson Ave, Newport News, VA, 23606 (United States)

    2013-04-19T23:59:59.000Z

    The CEBAF accelerator is being upgraded from 6 GeV to 12 GeV by the US Department of Energy. The accelerator upgrade is being done within the existing tunnel footprint. The accelerator upgrade includes: 10 new srfbased high-performance cryomodules plus RF systems, doubling the 2K helium plant's capability, upgrading the existing beamlines to operate at nearly double the original performance envelope, and adding a beamline to a new experimental area. Construction is over 75% complete with final completion projected for late FY13. Details of the upgrade and status of the work will be presented.

  7. Linac cryogenic distribution system maintenance and upgrades at JLab

    SciTech Connect (OSTI)

    Dixon, K.; Wright, M.; Ganni, V. [Thomas Jefferson National Accelerator Facility (JLab), Newport News, VA 23606 (United States)

    2014-01-29T23:59:59.000Z

    The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

  8. Linac cryogenic distribution system maintenance and upgrades at Jlab

    SciTech Connect (OSTI)

    Dixon, Kelly D. [JLAB; Wright, Mathew C. [JLAB; Ganni, Venkatarao [JLAB

    2014-01-01T23:59:59.000Z

    The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

  9. On the Teichmuller tower of mapping class groups Allen Hatcher, Pierre Lochak and Leila Schneps

    E-Print Network [OSTI]

    Schneps, Leila

    On the Teichmuller tower of mapping class groups Allen Hatcher, Pierre Lochak and Leila Schneps;nition of d GT 1 , and show that #3; acts on the tower of pro#12;nite mapping class groups bm g;n for all sketch our version of this history. A Teichmuller tower consists of a collection of (algebraic, i.e. pro

  10. JEFFERSON LAB 12 GEV CEBAF UPGRADE

    SciTech Connect (OSTI)

    Rode, C. H. [Thomas Jefferson National Accelerator Facility, Newport News, Virginia, 23606 (United States)

    2010-04-09T23:59:59.000Z

    The existing continuous electron beam accelerator facility (CEBAF) at Thomas Jefferson National Accelerator Facility (TJNAF) is a 5-pass, recirculating cw electron Linac operating at approx6 GeV and is devoted to basic research in nuclear physics. The 12 GeV CEBAF Upgrade is a $310 M project, sponsored by the Department of Energy (DOE) Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. The project received construction approval in September 2008 and has started the major procurement process. The cryogenic aspects of the 12 GeV CEBAF Upgrade includes: doubling the accelerating voltages of the Linacs by adding ten new high-performance, superconducting radiofrequency (SRF) cryomodules (CMs) to the existing 42 1/4 cryomodules; doubling of the 2 K cryogenics plant; and the addition of eight superconducting magnets.

  11. Rebuilding the Tower of Babel: An introduction to freshman composition

    E-Print Network [OSTI]

    Davis, Karen

    1978-01-01T23:59:59.000Z

    . 8 CKlly, y~c'1Dt ~:A~c~dht 0 E * d~cf t (Gl t, 111. : ~ t, 9 d 0 1972), p. 3. 9 Walker Gibson, ~Seein and ~Writin , 2nd ed. (New York: David McKay Co. , Inc, 1974), p. iii. 10 K M '(, ~CD (N Y k: Hyd E kC . , 19707, p. 27. Kelly, "Toward... Rebuilding the Tower of Babel: An Introduction to Freshman Composition. (May 1978) Karen Davis, B. A. , Southwest Texas State University Chairman of Advisory Committee: Dr. Forrest Dean Burt New teachers of composition need a handbook to supplement...

  12. Concentrating Solar Power Tower System Basics | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T, Inc.'sEnergyTexas1.Space DataEnergyCompressed AirEnergy »Tower

  13. Microsoft Word - PowerTower_work_2009.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHighandSWPA / SPRA / USACE LMI-EFRCAddendumNo. 1 Contract No.Tower R&D

  14. Upcoming Funding Opportunity for Tower Manufacturing and Installation |

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 Russian Nuclear Warheads intoMansoor Ghassem )Department of Energy for Tower

  15. Upgrade of Fermilab/NICADD photoinjector laboratory

    SciTech Connect (OSTI)

    Piot, P.; Edwards, H.; /Fermilab; Huning, M.; /DESY; Li, J.; Tikhoplav, R.; /Rochester U.; Koeth, T.; /Rutgers U., Piscataway

    2005-05-01T23:59:59.000Z

    The Fermilab/NICADD photoinjector laboratory is a 16 MeV electron accelerator dedicated to beam dynamics and advanced accelerator physics studies. FNPL will soon be capable of operating at {approx} 40 MeV, after the installation of a high gradient TESLA cavity. In this paper we present the foreseen design for the upgraded facility along with its performance. We discuss the possibilities of using of FNPL as an injector for the superconducting module and test facility (SM&TF).

  16. The APS control system network upgrade.

    SciTech Connect (OSTI)

    Sidorowicz, K. v.; Leibfritz, D.; McDowell, W. P.

    1999-10-22T23:59:59.000Z

    When it was installed,the Advanced Photon Source (APS) control system network was at the state-of-the-art. Different aspects of the system have been reported at previous meetings [1,2]. As loads on the controls network have increased due to newer and faster workstations and front-end computers, we have found performance of the system declining and have implemented an upgraded network. There have been dramatic advances in networking hardware in the last several years. The upgraded APS controls network replaces the original FDDI backbone and shared Ethernet hubs with redundant gigabit uplinks and fully switched 10/100 Ethernet switches with backplane fabrics in excess of 20 Gbits/s (Gbps). The central collapsed backbone FDDI concentrator has been replaced with a Gigabit Ethernet switch with greater than 30 Gbps backplane fabric. Full redundancy of the system has been maintained. This paper will discuss this upgrade and include performance data and performance comparisons with the original network.

  17. Optimizing Cooling Tower Performance Refrigeration Systems, Chemical Plants, and Power Plants All Have A Resource Quietly Awaiting Exploitation-Cold Water!!

    E-Print Network [OSTI]

    Burger, R.

    requirements before a cooling tower is purchased. This relates to the volume of circulating water, hot water temperature on the tower, cold water discharge, and wet bulb temperature (consisting of ambient temperature and relative humidity). After the tower...

  18. ON THE STRUCTURE AND STABILITY OF MAGNETIC TOWER JETS

    SciTech Connect (OSTI)

    Huarte-Espinosa, M.; Frank, A.; Blackman, E. G. [Department of Physics and Astronomy, University of Rochester, 600 Wilson Boulevard, Rochester, NY 14627-0171 (United States); Ciardi, A. [LERMA, Universite Pierre et Marie Curie, Observatoire de Paris, F-92195 Meudon (France); Hartigan, P. [Department of Physics and Astronomy, Rice University, 6100 S. Main, Houston, TX 77521-1892 (United States); Lebedev, S. V.; Chittenden, J. P. [Blackett Laboratory, Imperial College London, SW7 2BW London (United Kingdom)

    2012-09-20T23:59:59.000Z

    Modern theoretical models of astrophysical jets combine accretion, rotation, and magnetic fields to launch and collimate supersonic flows from a central source. Near the source, magnetic field strengths must be large enough to collimate the jet requiring that the Poynting flux exceeds the kinetic energy flux. The extent to which the Poynting flux dominates kinetic energy flux at large distances from the engine distinguishes two classes of models. In magneto-centrifugal launch models, magnetic fields dominate only at scales {approx}< 100 engine radii, after which the jets become hydrodynamically dominated (HD). By contrast, in Poynting flux dominated (PFD) magnetic tower models, the field dominates even out to much larger scales. To compare the large distance propagation differences of these two paradigms, we perform three-dimensional ideal magnetohydrodynamic adaptive mesh refinement simulations of both HD and PFD stellar jets formed via the same energy flux. We also compare how thermal energy losses and rotation of the jet base affects the stability in these jets. For the conditions described, we show that PFD and HD exhibit observationally distinguishable features: PFD jets are lighter, slower, and less stable than HD jets. Unlike HD jets, PFD jets develop current-driven instabilities that are exacerbated as cooling and rotation increase, resulting in jets that are clumpier than those in the HD limit. Our PFD jet simulations also resemble the magnetic towers that have been recently created in laboratory astrophysical jet experiments.

  19. FLUX MEASUREMENTS FROM A TALL TOWER IN A COMPLEX LANDSCAPE

    SciTech Connect (OSTI)

    Kurzeja, R.; Weber, A.; Chiswell, S.; Parker, M.

    2010-07-22T23:59:59.000Z

    The accuracy and representativeness of flux measurements from a tall tower in a complex landscape was assessed by examining the vertical and sector variability of the ratio of wind speed to momentum flux and the ratio of vertical advective to eddy flux of heat. The 30-60 m ratios were consistent with theoretical predictions which indicate well mixed flux footprints. Some variation with sector was observed that were consistent with upstream roughness. Vertical advection was negligible compared with vertical flux except for a few sectors at night. This implies minor influence from internal boundary layers. Flux accuracy is a function of sector and stability but 30-60 m fluxes were found to be generally representative of the surrounding landscape. This paper will study flux data from a 300 m tower, with 4 levels of instruments, in a complex landscape. The surrounding landscape will be characterized in terms of the variation in the ratio of mean wind speed to momentum flux as a function of height and wind direction. The importance of local advection will be assessed by comparing vertical advection with eddy fluxes for momentum and heat.

  20. Repairs to silence Tower bells | The Daily Texan http://dailytexanonline.com/news/2012/09/27/repairs-to-silence-tower-bells 2 of 4 10/2/2012 8:55 AM

    E-Print Network [OSTI]

    John, Lizy Kurian

    Repairs to silence Tower bells | The Daily Texan http://dailytexanonline.com/news/2012/09/27/repairs-to-silence-tower-bells 2 of 4 10/2/2012 8:55 AM #12;Repairs to silence Tower bells | The Daily Texan http://dailytexanonline.com/news/2012/09/27/repairs-to-silence-tower-bells 3 of 4 10/2/2012 8

  1. GreenCache: Augmenting Off-the-Grid Cellular Towers with Multimedia Caches

    E-Print Network [OSTI]

    Shenoy, Prashant

    or commercial advantage and that copies bear this notice and the full citation on the first page. To copy to run cellular towers "off the grid" [4]. Today's "off the grid" cellu- lar towers operate off diesel with expensive and "dirty" diesel fuel. S

  2. Method and system for simulating heat and mass transfer in cooling towers

    DOE Patents [OSTI]

    Bharathan, Desikan (Lakewood, CO); Hassani, A. Vahab (Golden, CO)

    1997-01-01T23:59:59.000Z

    The present invention is a system and method for simulating the performance of a cooling tower. More precisely, the simulator of the present invention predicts values related to the heat and mass transfer from a liquid (e.g., water) to a gas (e.g., air) when provided with input data related to a cooling tower design. In particular, the simulator accepts input data regarding: (a) cooling tower site environmental characteristics; (b) cooling tower operational characteristics; and (c) geometric characteristics of the packing used to increase the surface area within the cooling tower upon which the heat and mass transfer interactions occur. In providing such performance predictions, the simulator performs computations related to the physics of heat and mass transfer within the packing. Thus, instead of relying solely on trial and error wherein various packing geometries are tested during construction of the cooling tower, the packing geometries for a proposed cooling tower can be simulated for use in selecting a desired packing geometry for the cooling tower.

  3. SHM BASED SYSTEM DESIGN OFA WIND TURBINE TOWER USING A MODAL SENSITIVITY BASED BAYES DETECTOR

    E-Print Network [OSTI]

    Boyer, Edmond

    SHM BASED SYSTEM DESIGN OFA WIND TURBINE TOWER USING A MODAL SENSITIVITY BASED BAYES DETECTOR Mads@ramboll.com ABSTRACT It is investigated if material based structural safety can be replaced with safety obtained from of the NREL 5MW wind turbine tower subjected to bending fatigue and horizontal circumferential cracking

  4. PIPE CLEANER TOWERS ACTIVITY Contributors: Dr. Laura Bottomley & Heather Smolensky Page 1 of 2

    E-Print Network [OSTI]

    -12+ Group Size: 3-4 Time Required: 15-20 minutes Mest-Up Factor: 1 (Setup and Mess Factor: 1 to 10 scale materials to build the tallest, free standing tower within the time constraints and using the efforts of all-tech' materials to build the tallest, free standing tower that they can within certain time constraints. Check

  5. Computer Simulation of Cooling Effect of Wind Tower on Passively Ventilated Building

    E-Print Network [OSTI]

    Seryak, J.; Kissock, J. K.

    2002-01-01T23:59:59.000Z

    Computer Simulation of Cooling Effect of Wind Tower on Passively Ventilated Building John Seryak Kelly Kissock Project Engineer Associate Professor Department of Mechanical and Aerospace Engineering... University of Dayton Dayton, Ohio ABSTRACT Traditional buildings are cooled and ventilated by mechanically induced drafts. Natural ventilation aspires to cool and ventilate a building by natural means, such as cross ventilation or wind towers...

  6. Daily Texan April 1, 2014 Keeping Tower dark for Earth Hour was

    E-Print Network [OSTI]

    John, Lizy Kurian

    of the University's Energy and Water Conservation program, said the Tower going dark was a gesture similarDaily Texan April 1, 2014 Keeping Tower dark for Earth Hour was intended to raise awareness British thermal units, of natural gas. According to the University's Utilities and Energy Management

  7. Request for Degree Certification Exception Office of the Registrar, University of Memphis, 003 Wilder Tower / Ph: 678-2810

    E-Print Network [OSTI]

    Dasgupta, Dipankar

    Wilder Tower / Ph: 678-2810 A Tennessee Board of Regents Institution An Equal Opportunity, 003 Wilder Tower. Reset S E L E C T O N E: #12;

  8. Methods and apparatuses for preparing upgraded pyrolysis oil

    DOE Patents [OSTI]

    Brandvold, Timothy A; Baird, Lance Awender; Frey, Stanley Joseph

    2013-10-01T23:59:59.000Z

    Methods and apparatuses for preparing upgraded pyrolysis oil are provided herein. In an embodiment, a method of preparing upgraded pyrolysis oil includes providing a biomass-derived pyrolysis oil stream having an original oxygen content. The biomass-derived pyrolysis oil stream is hydrodeoxygenated under catalysis in the presence of hydrogen to form a hydrodeoxygenated pyrolysis oil stream comprising a cyclic paraffin component. At least a portion of the hydrodeoxygenated pyrolysis oil stream is dehydrogenated under catalysis to form the upgraded pyrolysis oil.

  9. System and method for aligning heliostats of a solar power tower

    DOE Patents [OSTI]

    Convery, Mark R.

    2013-01-01T23:59:59.000Z

    Disclosed is a solar power tower heliostat alignment system and method that includes a solar power tower with a focal area, a plurality of heliostats that each reflect sunlight towards the focal area of the solar power tower, an off-focal area location substantially close to the focal area of the solar power tower, a communication link between the off-focal area location and a misaligned heliostat, and a processor that interprets the communication between the off-focal area location and the misaligned heliostat to identify the misaligned heliostat from the plurality of heliostats and that determines a correction for the identified misaligned heliostat to realign the misaligned heliostat to reflect sunlight towards the focal area of the solar power tower.

  10. BNL ACCELERATOR TEST FACILITY CONTROL SYSTEM UPGRADE R. Malone...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ACCELERATOR TEST FACILITY CONTROL SYSTEM UPGRADE R. Malone, I. Ben-Zvi, X. Wang, V. Yakimenko BNL , Upton, NY 11973, USA Abstract Brookhaven National Laboratory's Accelerator...

  11. Federal Finance Facilities Available for Energy Efficiency Upgrades...

    Broader source: Energy.gov (indexed) [DOE]

    Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment resource guide lists the various federal financing programs for which energy efficiency and...

  12. EA-1190: Wastewater Treatment Capability Upgrade, Amarillo, Texas

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposed upgrade of the U.S. Department of Energy Pantex Plant Wastewater Treatment Plant in Amarillo, Texas.

  13. Media Advisory - Jefferson Lab 12 GeV Upgrade Groundbreaking...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for its 310 million 12 GeV Upgrade project. When: Tuesday, April 14, 2009. Where: CEBAF Center, Thomas Jefferson National Accelerator Facility, 12000 Jefferson Avenue,...

  14. asdex upgrade results: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    physical control system would do. The real time emulation of both, fusion Zachmann, Gabriel 3 Ghost surfaces and island detection Application to LHD and ASDEX Upgrade...

  15. asdex upgrade invited: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    physical control system would do. The real time emulation of both, fusion Zachmann, Gabriel 3 Ghost surfaces and island detection Application to LHD and ASDEX Upgrade...

  16. asdex upgrade team: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    physical control system would do. The real time emulation of both, fusion Zachmann, Gabriel 5 Ghost surfaces and island detection Application to LHD and ASDEX Upgrade...

  17. asdex upgrade divertor: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    physical control system would do. The real time emulation of both, fusion Zachmann, Gabriel 7 Ghost surfaces and island detection Application to LHD and ASDEX Upgrade...

  18. asdex upgrade edge: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    physical control system would do. The real time emulation of both, fusion Zachmann, Gabriel 4 Ghost surfaces and island detection Application to LHD and ASDEX Upgrade...

  19. asdex upgrade enhancements: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    physical control system would do. The real time emulation of both, fusion Zachmann, Gabriel 3 Ghost surfaces and island detection Application to LHD and ASDEX Upgrade...

  20. Conceptual design report for Project W-420, stack monitoring upgrade

    SciTech Connect (OSTI)

    Lott, D.T., Fluor Daniel Hanford

    1997-03-10T23:59:59.000Z

    This document provides the Conceptual Design for the upgrade of seven designated Tank Farm stacks to meet NESHAP Title 40, CFR, Part 61, Sub-part H requirements.

  1. Office of Energy Policy and Systems Analysis Site Upgrade

    Broader source: Energy.gov [DOE]

    Office of Energy Policy and Systems Analysis site is currently being upgraded to better serve on audience. Please check back shortly.

  2. EFFICIENCY MAINE DIRECT INSTALLS INCREASE UPGRADE PACE | Department...

    Broader source: Energy.gov (indexed) [DOE]

    EFFICIENCY MAINE DIRECT INSTALLS INCREASE UPGRADE PACE Although Maine has one of the United States' highest homeownership rates, more than one-third of the state's residents...

  3. Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange...

    Broader source: Energy.gov (indexed) [DOE]

    Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange Facilities Case study details the U.S. Department of Defense (DOD) Exchange (formerly the Army and Air Force...

  4. Bioenergy Technologies Office R&D Pathways: Algal Lipid Upgrading...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Algal Biofuels Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway Bioenergy Technologies Office Conversion R&D Pathway: Whole Algae Hydrothermal Liquefaction...

  5. Federal Finance Facilities Available for Energy Efficiency Upgrades...

    Broader source: Energy.gov (indexed) [DOE]

    September 24, 2013 Clean Energy Finance: A Guide to Federal Financing Programs Available for Energy Efficiency Upgrades and Clean Energy Deployment 2 Agenda * Welcome - Molly Lunn,...

  6. Community based outreach strategies in residential energy upgrade programs

    E-Print Network [OSTI]

    McEwen, Brendan (Brendan Carl Francis)

    2012-01-01T23:59:59.000Z

    Home energy upgrades can reduce residential energy consumption and improve indoor conditions, thereby realizing environmental, economic, health and other social benefits. Utilities, government and other actors have established ...

  7. What's Working in Residential Energy Efficiency Upgrade Programs...

    Energy Savers [EERE]

    Texas: Best Offer Ever Produces 564 Upgrades in Record Time Better Buildings Neighborhood Program Home Accomplishments History Better Buildings Partners Stories Interviews Videos...

  8. Verification of BModes: Rotary Beam and Tower Modal Analysis Code; Preprint

    SciTech Connect (OSTI)

    Bir, G.

    2010-04-01T23:59:59.000Z

    This paper describes verification of BModes, a finite-element code developed to provide coupled modes for the blades and tower of a wind turbine. The blades, which may be rotating or non-rotating, and the towers, whether onshore or offshore, are modeled using specialized 15-dof beam finite elements. Both blade and tower models allow a tip attachment, which is assumed to be rigid body with six moments of inertia, and a mass centroid that may be offset from the blade or tower axis. Examples of tip attachments are aerodynamic brakes for blades and nacelle-rotor subassembly for towers. BModes modeling allows for tower supports including tension wires, floating platforms, and monopiles on elastic foundations. Coupled modes (implying coupling of flap, lag, axial, and torsional motions) are required for modeling major flexible components in a modal-based, aeroelastic code such as FAST1. These are also required for validation of turbine models using experimental data, modal-based fatigue analysis, controls design, and understanding aeroelastic-stability behavior of turbines. Verification studies began with uniform tower models, with and without tip inertia, and progressed to realistic towers. For the floating turbine, we accounted for the effects of hydrodynamic inertia, hydrostatic restoring, and mooring lines stiffness. For the monopole-supported tower, we accounted for distributed hydrodynamic mass on the submerged part of the tower and for distributed foundation stiffness. Finally, we verified a model of a blade carrying tip mass and rotating at different speeds (verifications of other blade models, rotating or non-rotating, have been reported in another paper.) Verifications were performed by comparing BModes-generated modes with analytical results, if available, or with MSC.ADAMS results. All results in general show excellent agreement.

  9. Microsoft Word - Wireless - Sprint upgrades CX.docx

    Broader source: Energy.gov (indexed) [DOE]

    new antennas to a BPA-owned monopole adjacent to tower 59 on the 115-kV Ross- Carborundum No. 1 transmission line. Sprint would install a new 17 inch by 30 inch utility...

  10. 'Tower of Babel' technology nears The problem of compatibility between wireless devices is being addressed at an

    E-Print Network [OSTI]

    Bressler, Steven L.

    'Tower of Babel' technology nears The problem of compatibility between wireless devices is being "Tower of Babel" technology - software that can converge different wireless gadgets into a single device and Computers is being held, said: "SDR is what one could call a Tower of Babel-type technology

  11. tall tower facility and instrumentation New coNstraiNts oN the Nitrous oxide budget of agricultural ecosystems

    E-Print Network [OSTI]

    Minnesota, University of

    tall tower facility and instrumentation New coNstraiNts oN the Nitrous oxide budget of agricultural approach involves multiple tunable diode laser (TDL) spectroscopy systems, a tall tower, automated chambers hectare. Measurements are also made at the tall tower trace gas observatory (TGO) located at RROC

  12. 1201 Lake Robbins Drive The Woodlands, Texas 77380 (832) 636-1000 DIRECTIONS TO THE ANADARKO TOWER

    E-Print Network [OSTI]

    Behmer, Spencer T.

    TOWER From Houston: Exit Woodlands Parkway (Exit 76B) fly-over from I-45 North. Turn right onto Woodloch entrance to the tower is the third entry on the right. Follow the directions to Visitor Parking. From right into the Tower entrance. Follow the directions to Visitor Parking. From Bush Intercontinental

  13. Methane efflux from boreal wetlands: Theory and testing of the ecosystem model Ecosys with chamber and tower flux measurements

    E-Print Network [OSTI]

    Roulet, Nigel T.

    and tower flux measurements R. F. Grant Department of Renewable Resources, University of Alberta, Edmonton tower at a beaver pond in the BOREAS Northern Study Area. Spatial and temporal variation of CH4 effluxes in the model encompassed that measured by surface chambers and the flux tower. Both modeled and measured CH4

  14. ECE DEPARTMENT TOWER Through the team effort of Professor's Michael Carter and Richard Messner, Kingsbury Hall has

    E-Print Network [OSTI]

    New Hampshire, University of

    ECE DEPARTMENT TOWER Through the team effort of Professor's Michael Carter and Richard Messner, Kingsbury Hall has sprouted a new 70 foot antenna tower this summer, which will expand the capabilities laboratory exercises in software-defined radio, the new tower will host an experimental MIMO cellular base

  15. Advanced Photon Source Upgrade Project Preliminary Design Report Advanced Photon Source Upgrade Project

    E-Print Network [OSTI]

    Kemner, Ken

    .......................................................................................................1­8 1.3.3 Work Breakdown Structure Upgrade Project · Preliminary Design Report The Advanced Photon Source, an Office of Science User Facility operated for the U.S. Department of Energy (DOE) Office of Science by Argonne National Laboratory

  16. The value of steam turbine upgrades

    SciTech Connect (OSTI)

    Potter, K.; Olear, D.; [General Physics Corp. (United States)

    2005-11-01T23:59:59.000Z

    Technological advances in mechanical and aerodynamic design of the turbine steam path are resulting in higher reliability and efficiency. A recent study conducted on a 390 MW pulverized coal-fired unit revealed just how much these new technological advancements can improve efficiency and output. The empirical study showed that the turbine upgrade raised high pressure (HP) turbine efficiency by 5%, intermediate pressure (IP) turbine efficiency by 4%, and low pressure (LP) turbine efficiency by 2.5%. In addition, the unit's highest achievable gross generation increased from 360 MW to 371 MW. 3 figs.

  17. Syngas Upgrading to Hydrocarbon Fuels Technology Pathway

    SciTech Connect (OSTI)

    Talmadge, M.; Biddy, M.; Dutta, A.; Jones, S.; Meyer, A.

    2013-03-01T23:59:59.000Z

    This technology pathway case investigates the upgrading of woody biomass derived synthesis gas (syngas) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and lowest risk conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas-to-hydrocarbon pathway to be competitive with petroleum-derived gasoline-, diesel- and jet-range hydrocarbon blendstocks.

  18. Jefferson Lab awards upgrade contracts | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn12 InvestigationLabNewLabLabbeginawards upgrade

  19. Cyclotron Institute Upgrade Project - Facilities - Cyclotron Institute

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItem NotEnergy,ARMFormsGas SeparationsRelevant toSiteCurrent Long-TermUpgrade Overview /

  20. The Cryogenic Dark Matter Search: First 5-Tower Data and Improved Understanding of Ionization Collection

    SciTech Connect (OSTI)

    Bailey, Catherine N.; /Case Western Reserve U.

    2010-01-01T23:59:59.000Z

    The Cryogenic Dark Matter Search (CDMS) is searching for Weakly Interacting Massive Particles (WIMPs) with cryogenic particle detectors. These detectors have the ability to discriminate between nuclear recoil candidate and electron recoil background events by collecting both phonon and ionization energy from recoils in the detector crystals. The CDMS-II experiment has completed analysis of the first data runs with 30 semiconductor detectors at the Soudan Underground Laboratory, resulting in a world leading WIMP-nucleon spin-independent cross section limit for WIMP masses above 44 GeV/c{sup 2}. As CDMS aims to achieve greater WIMP sensitivity, it is necessary to increase the detector mass and discrimination between signal and background events. Incomplete ionization collection results in the largest background in the CDMS detectors as this causes electron recoil background interactions to appear as false candidate events. Two primary causes of incomplete ionization collection are surface and bulk trapping. Recent work has been focused on reducing surface trapping through the modification of fabrication methods for future detectors. Analyzing data taken with test devices has shown that hydrogen passivation of the amorphous silicon blocking layer worsens surface trapping. Additional data has shown that the iron-ion implantation used to lower the critical temperature of the tungsten transition-edge sensors causes a degradation of the ionization collection. Using selective implantation on future detectors may improve ionization collection for events near the phonon side detector surface. Bulk trapping is minimized by neutralizing ionized lattice impurities. Detector investigations at testing facilities and in situ at the experimental site have provided methods to optimize the neutralization process and monitor running conditions to maintain full ionization collection. This work details my contribution to the 5-tower data taking, monitoring, and analysis effort as well as the SuperCDMS detector development with the focus on monitoring and improving ionization collection in the detectors.

  1. Towering oak, the sun - porch house winner of the ''1982 German research award''

    SciTech Connect (OSTI)

    Berndt, G.W.P.

    1983-12-01T23:59:59.000Z

    The design for this energy-efficient house was developed to suit a benign climate with much rain, wind, and fog. The building's basic construction guarantees the most limited energy-use possible. This is achieved through a unique houseform, which encloses and warms the living spaces with a thick thermal coat: walls = 6'' semi-rigid glass fiber boards, R-19; roof = 10'' foil faced fiber glass, R = 30. Windows are located only on the south side, to ensure optimal sun-ray capture. The housefront consists of a ''sun-porch'' (Sonnenhof), which is a further development of the well-known German ''Wintergarten'' (winter garden). In this climate region, one can only expect a yearly average of five days with a summer temperature of over 25/sup 0/C (77/sup 0/F); however, with a ''sun-porch'' the summer can make itself at home. In winter, the ''sun-porch'' protects against storms and always offers temperatures above the 7/sup 0/C (45/sup 0/F) minimum, a product of the compact roof and double glass with selective coating. On sunny winter days, one may even dine on the balconies. The estimation technique represented here is based on a procedure devised at the Los Alamos Scientific Laboratory, New Mexico, (Passive Solar Handbook, Vol. 2, J.D. Balcomb). ''Towering Oak's'' solar savings fraction = 49.0%; heating load = 2.56 BTU/sq. ft. Better results have yet to be achieved in Germany. In the USA, this could be increased to a solar fraction of up to 90%. Some modifications would, however, be necessary to suit the local climate (sun control devices, etc.).

  2. A study of a cooling tower with variable packing heights 

    E-Print Network [OSTI]

    Khan, A. M. M. Farid

    1957-01-01T23:59:59.000Z

    for the uc;x oe of . 'f ~'F. CF 'SC L'. . INC 2 August 1957 i ajor: ', iechanical Zn;. :tneering A Stud. ;; of a Coolinp, Tower with Variable Packin- Heights A Thesis li. Vi. Farid Khan Approved as to style and. content by: Chaxrman of Commi tee... the Departm;. nt i~lonth Year fLCI inc)'&lr ' JGL&)) 'n fi3 a J thor ', ;laili . . io ila&' ' I. ' ~)oi&al J ?'. )' e . I al, &Lip & vi &or Heal ' oA'c '&I'oup oI . e& Ds !:I&Ei 1''el Ills i. oi&I'I'ei jb : taei i&n for i'urili li&i 1. ?a& rial anu equip...

  3. Solar two: A molten salt power tower demonstration

    SciTech Connect (OSTI)

    Tyner, C.E. [Sandia National Labs., Albuquerque, NM (United States); Sutherland, J.P. [Southern California Edison, Rosemead, CA (United States); Gould, W.R. Jr. [Bechtel Corp., San Francisco, CA (United States)

    1995-08-01T23:59:59.000Z

    A consortium of United States utility concerns led by the Southern California Edison Company (SCE) is conducting a cooperative project with the US Department of Energy (DOE), Sandia National Laboratories, and industry to convert the 10-MW Solar One Power Tower Pilot Plant to molten nitrate salt technology. The conversion involves installation of a new receiver, a new thermal storage system, and a new steam generator; it utilizes Solar One`s heliostat field and turbine generator. Successful operation of the converted plant, called Solar Two, will reduce economic risks in building initial commercial power tow projects and accelerate the commercial acceptance of this promising renewable energy technology. The estimated cost of Solar Two, including its three-year test period, is $48.5 million. The plant will begin operation in early 1996.

  4. On the quantum analogue of Galileo's leaning tower experiment

    E-Print Network [OSTI]

    Md. Manirul Ali; A. S. Majumdar; Dipankar Home; Alok Kumar Pan

    2006-10-14T23:59:59.000Z

    The quantum analogue of Galileo's leaning tower experiment is revisited using wave packets evolving under the gravitational potential. We first calculate the position detection probabilities for particles projected upwards against gravity around the classical turning point and also around the point of initial projection, which exhibit mass dependence at both these points. We then compute the mean arrival time of freely falling particles using the quantum probability current, which also turns out to be mass dependent. The mass dependence of both the position detection probabilities and the mean arrival time vanish in the limit of large mass. Thus, compatibility between the weak equivalence principle and quantum mechanics is recovered in the macroscopic limit of the latter.

  5. Flue gas injection control of silica in cooling towers.

    SciTech Connect (OSTI)

    Brady, Patrick Vane; Anderson, Howard L., Jr.; Altman, Susan Jeanne

    2011-06-01T23:59:59.000Z

    Injection of CO{sub 2}-laden flue gas can decrease the potential for silica and calcite scale formation in cooling tower blowdown by lowering solution pH to decrease equilibrium calcite solubility and kinetic rates of silica polymerization. Flue gas injection might best inhibit scale formation in power plant cooling towers that use impaired makeup waters - for example, groundwaters that contain relatively high levels of calcium, alkalinity, and silica. Groundwaters brought to the surface for cooling will degas CO{sub 2} and increase their pH by 1-2 units, possibly precipitating calcite in the process. Recarbonation with flue gas can lower the pHs of these fluids back to roughly their initial pH. Flue gas carbonation probably cannot lower pHs to much below pH 6 because the pHs of impaired waters, once outgassed at the surface, are likely to be relatively alkaline. Silica polymerization to form scale occurs most rapidly at pH {approx} 8.3 at 25 C; polymerization is slower at higher and lower pH. pH 7 fluids containing {approx}220 ppm SiO{sub 2} require > 180 hours equilibration to begin forming scale whereas at pH 8.3 scale formation is complete within 36 hours. Flue gas injection that lowers pHs to {approx} 7 should allow substantially higher concentration factors. Periodic cycling to lower recoveries - hence lower silica concentrations - might be required though. Higher concentration factors enabled by flue gas injection should decrease concentrate volumes and disposal costs by roughly half.

  6. CEBAF Upgrade: Cryomodule Performance And Lessons Learned

    SciTech Connect (OSTI)

    Drury, Michael A.; Davis, G. Kirk; Hogan, John P.; Hovater, J. Curt; King, Lawrence; Marhauser, Frank; Park, HyeKyoung; Preble, Joe; Reece, Charles E.; Rimmer, Robert A.; Wang, Haipeng; Wiseman, Mark A.

    2014-02-01T23:59:59.000Z

    The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

  7. The enhanced ASDEX Upgrade pellet centrifuge launcher

    SciTech Connect (OSTI)

    Plöckl, B.; Lang, P. T. [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)] [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)

    2013-10-15T23:59:59.000Z

    Pellets played an important role in the program of ASDEX Upgrade serving both for investigations on efficient particle fuelling and high density scenarios but also for pioneering work on Edge Localised Mode (ELM) pacing and mitigation. Initially designed for launching fuelling pellets from the magnetic low field side, the system was converted already some time ago to inject pellets from the magnetic high field side as much higher fuelling efficiency was found using this configuration. In operation for more than 20 years, the pellet launching system had to undergo a major revision and upgrading, in particular of its control system. Furthermore, the control system installed adjacent to the launcher had to be transferred to a more distant location enforcing a complete galvanic separation from torus potential and a fully remote control solution. Changing from a hybrid system consisting of PLC S5/S7 and some hard wired relay control to a state of the art PLC system allowed the introduction of several new operational options enabling more flexibility in the pellet experiments. This article describes the new system architecture of control hardware and software, the operating procedure, and the extended operational window. First successful applications for ELM pacing and triggering studies are presented as well as utilization for the development of high density scenarios.

  8. Bitumen utilization via partial upgrading and emulsification

    SciTech Connect (OSTI)

    Sankey, B.M.; Ghosh, M.; Chakrabarty, T. [Imperial Oil Resources Limited, Calgary, Alberta (Canada)

    1995-12-31T23:59:59.000Z

    Further development of the oil sands resources of Alberta, Canada, is constrained by the ability of downstream refineries to process the high sulfur, high viscosity, and high asphaltene content bitumen. Recent engineering studies have demonstrated that high conversion processing of bitumen to produce synthetic crude oil shows at best marginal economics. In this paper, an alternative concept of bitumen upgrading and heavy bottoms utilization is presented. The proposed method of Phased Partial Upgrading (PPU) involves, first, separation of the bitumen into a light overhead fraction and a heavy bottom fraction using conventional processes, such as distillation or solvent deasphalting. The light overhead fraction, which resembles a typical light sour crude, can be marketed directly, or can be hydrotreated to reduce sulfur and enhance quality as catalytic cracker feedstock. The PPU heavy fraction is converted to an emulsion fuel using new techniques and a proprietary surfactant formulation. This fuel can replace coal and other heavy fuels in electrical utilities. Emulsion fuel prepared in a continuous pilot unit was successfully burned in several combustion test programs.

  9. Magnetic switching, final chapter, Book I: the ATA upgrade prototype

    SciTech Connect (OSTI)

    Birx, D.; Cook, E.; Hawkins, S.; Poor, S.; Reginato, L.; Schmidt, J.; Smith, M.W.

    1983-03-22T23:59:59.000Z

    Efforts directed at finding a 10 kHz switch to replace the current 1 kHz gas blown spark gap have culminated in a prototype for an upgrade of ATA. The design and performance of this prototype as well as possible options and recommendations concerning an eventual upgrade are described. 4 references, 9 figures.

  10. Faculty & Staff Email (Server) Upgrade How does this affect me?

    E-Print Network [OSTI]

    Seldin, Jonathan P.

    Faculty & Staff Email (Server) Upgrade How does this affect me? PC Users: No effect server to the Exchange 2010 server. Mobile phones, tablets and email clients (Microsoft Outlook? Upgrading to Exchange 2010 requires us to replace the server to which you connect to retrieve Email

  11. Rebates Cut the Price of Big-Time Efficiency Upgrades

    Broader source: Energy.gov [DOE]

    One of the smartest ways for homeowners to save money on major appliance upgrades is to hook into an energy efficiency rebate program. The Neighborhood Energy Connection (NEC), a non-profit organization in St. Paul, Minnesota, helps local residents take advantage of Xcel Energy’s rebate programs that cut the cost of whole-house energy efficiency upgrades.

  12. Sandia National Laboratories: Upgrades to SNL-EFDC: A Tool to...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ClimateECEnergyComputational Modeling & SimulationUpgrades to SNL-EFDC: A Tool to Balance Marine Hydrokinetic Energy Generation Efficiency with Environmental Response Upgrades to...

  13. U.S. And Russia Complete Nuclear Security Upgrades Under Bratislava...

    Energy Savers [EERE]

    And Russia Complete Nuclear Security Upgrades Under Bratislava Initiative U.S. And Russia Complete Nuclear Security Upgrades Under Bratislava Initiative December 23, 2008 - 9:18am...

  14. The 12 GeV Energy Upgrade at Jefferson Laboratory

    SciTech Connect (OSTI)

    Pilat, Fulvia C.

    2012-09-01T23:59:59.000Z

    Two new cryomodules and an extensive upgrade of the bending magnets at Jefferson Lab has been recently completed in preparation for the full energy upgrade in about one year. Jefferson Laboratory has undertaken a major upgrade of its flagship facility, the CW re-circulating CEBAF linac, with the goal of doubling the linac energy to 12 GeV. I will discuss here the main scope and timeline of the upgrade and report on recent accomplishments and the present status. I will then discuss in more detail the core of the upgrade, the new additional C100 cryomodules, their production, tests and recent successful performance. I will then conclude by looking at the future plans of Jefferson Laboratory, from the commissioning and operations of the 12 GeV CEBAF to the design of the MEIC electron ion collider.

  15. Improvement of risk estimate on wind turbine tower buckled by hurricane

    E-Print Network [OSTI]

    Li, Jingwei

    2013-01-01T23:59:59.000Z

    Wind is one of the important reasonable resources. However, wind turbine towers are sure to be threatened by hurricanes. In this paper, method to estimate the number of wind turbine towers that would be buckled by hurricanes is discussed. Monte Carlo simulations show that our method is much better than the previous one. Since in our method, the probability density function of the buckling probability of a single turbine tower in a single hurricane is obtained accurately but not from one approximated expression. The result in this paper may be useful to the design and maintenance of wind farms.

  16. On The N-Tower-Problem and Related Problems F.Thomas Bruss Guy Louchard y John W.Turner z

    E-Print Network [OSTI]

    Louchard, Guy

    On The N-Tower-Problem and Related Problems F.Thomas Bruss #3; Guy Louchard y John W.Turner z November 12, 2002 Abstract N towers contain initially n i (i = 1; 2; :::N) counters. At each step a tower is chosen at random, a counter removed which is then added to another tower also chosen at random

  17. Upgrading Amerada-type survey clocks for high-temperature geothermal service

    SciTech Connect (OSTI)

    Major, B.H.; Witten, C.L.

    1980-09-01T23:59:59.000Z

    The Amerada type subsurface recording gauges have been used by the oil and gas industry for many years. These mechanical logging instruments are currently used by the growing goethermal industry. As the gauges were designed for service in low-temperature oil and gas wells, a significant number of failures are occurring at elevated geothermal temperatures. The spring driven mechanical survey clocks appear to be the primary cause of the failures. The clock mechanisms tend to stop or lock-up when exposed to temperatures as high as 300/sup 0/C. This paper summarizes a project that was undertaken to upgrade the survey clocks to 300/sup 0/C capability. The major problems causing clock failure were indentified and corrected by straightforward design modifications together with special lubrication of the moving parts. Several clocks so modified performed reliably, both during laboratory oven tests and during field tests that were performed in actual geothermal wells at temperatures up to 330/sup 0/C.

  18. The change in risk due to upgrade to a digital reactor protection system

    SciTech Connect (OSTI)

    Ostrom, L.T.; Galyean, W.J.; Wilhelmsen, C.A.; Haney, L.N. [Idaho National Engineering Lab., Idaho Falls, ID (United States)

    1994-10-01T23:59:59.000Z

    The United States Nuclear Regulatory Commission (NRC) is sponsoring the Idaho National Engineering Laboratory (INEL) to study the risk impact of the upgrade of commercial nuclear power plants (NPPs) from analog to digital instrumentation. It was decided to use a limited probabilistic risk assessment (PRA) methodology to assess the risk impact due to the implementation of digital control systems. The human reliability analysis (HRA)/PRA analysis was to be a pre- and post-upgrade comparison to determine the change in risk. A candidate NPP was selected as the initial step in the analysis process. The selection process entailed reviewing the literature to identify NPPs that had undergone a modification in which a digital control system (DCS) replaced an analog control system. Preference was given to plants where the DCS controlled safety systems. Several NPPs were considered for the candidate plant. The NPP was selected primarily because: (1) it had replaced its existing analog control system with the Westinghouse Eagle-21 Process Protection System (Eagle-21); (2) it had several years experience with the DCS; and (3) the NPP`s management demonstrated a willingness to support the project.

  19. Tenneco upgrades system with equipment conversion

    SciTech Connect (OSTI)

    Wright, K. [Ariel Corp., Mt. Vernon, OH (United States)

    1995-10-01T23:59:59.000Z

    Tenneco Gas, Inc., Houston, recently completed the successful conversion of over 14,300 horsepower compression equipment at its transmission in Catlettsburg, KY. The system consists of three identical Ariel JGC/6 compressors, driven by three matching Ansaldo electric motors, capable of running between 450 and 900 rpm. These variable speed, synchronous electric motors allow for greater flexibility, without the use of traditional cylinder unloaders. If desired Eureka Energy Systems, Richardson, TX designed the compressor package. One of Tenneco`s objectives when selecting a package to upgrade existing compression capabilities was to ensure compliance with future regulations promulgated pursuant to the Clean Air Act Amendments of 1990. Initially, Tenneco considered separable compressors because of the availability of the newer, clean burning, gas ignited drivers in the 5,000 horsepower range, such as the Caterpillar 3612 and 3616. This paper reviews the design, performance and comparative operating cost of these compressor units.

  20. Steam turbine upgrading: low-hanging fruit

    SciTech Connect (OSTI)

    Peltier, R.

    2006-04-15T23:59:59.000Z

    The thermodynamic performance of the steam turbine, more than any other plant component, determines overall plant efficiency. Upgrading steam path components and using computerized design tools and manufacturing techniques to minimise internal leaks are two ways to give tired steam turbines a new lease on life. The article presents three case studies that illustrate how to do that. These are at Unit 1 of Dairyland's J.P. Madgett Station in Alma, WI, a coal-fired subcritical steam plant; the four units at AmerenUE's 600 MW coal-fired Labadie plant west of St. Louis; and Unit 3 of KeyPlan Corp's Northport Power Station on Long Island. 8 figs.

  1. LLRF System for the CEBAF Separator Upgrade

    SciTech Connect (OSTI)

    Plawski, Tomasz E. [JLAB; Bachimanchi, Ramakrishna [JLAB; Hovater, J. Curt [JLAB; Seidman, David J. [JLAB; Wissmann, Mark J. [JLAB

    2014-12-01T23:59:59.000Z

    The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of four new 748.5 MHz normal conducting deflecting cavities in the 5th pass extraction region. This system will work together with the existing 499 MHz RF Separator in order to allow simultaneous delivery of the beam to four CEBAF experimental halls. The RF system employs two digital LLRF systems controlling four cavities in a vector sum. Cavity tune information of the individual cavities is also obtained using a multiplexing scheme of the forward and reflected RF signals. In this paper we will present detailed LLRF design and the current status of the CEBAF 748.5/499 MHz beam extraction system.

  2. MONITORING OF CRACKS ON THE BELL TOWER OF ST. ANASTASIA CATHEDRAL IN ZADAR CROATIA

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    MONITORING OF CRACKS ON THE BELL TOWER OF ST. ANASTASIA CATHEDRAL IN ZADAR CROATIA Davor Uglesi 1 , Uros Bohinc 2 1 D & Z doo, Jerolima Vidulia 7, 23000 Zadar, Croatia 2 ZAG, Dimiceva 12, 1000 Ljubljana

  3. LODGING IN MILFORD AREA Accomodations 10 20 minutes from Grey Towers

    E-Print Network [OSTI]

    LODGING IN MILFORD AREA Accomodations 10 ­ 20 minutes from Grey Towers: Best Western Inn 120 Rtes-4414 Westfall's Motel Rtes. 6 & 209 Milford, PA 18337 (570) 491-4344 #12;Accomodations 20 ­ 30 minutes from Grey

  4. BREN Tower: A Monument to the Material Culture of Radiation Dosimetry Research

    SciTech Connect (OSTI)

    Susan Edwards

    2008-05-30T23:59:59.000Z

    With a height of more than 1,500 feet, the BREN (Bare Reactor Experiment, Nevada) Tower dominates the surrounding desert landscape of the Nevada Test Site. Associated with the nuclear research and atmospheric testing programs carried out during the 1950s and 1960s, the tower was a vital component in a series of experiments aimed at characterizing radiation fields from nuclear detonations. Research programs conducted at the tower provided the data for the baseline dosimetry studies crucial to determining the radiation dose rates received by the atomic bomb survivors of Hiroshima and Nagasaki, Japan. Today, BREN Tower stands as a monument to early dosimetry research and one of the legacies of the Cold War.

  5. Beyond the ivory tower : in search of a new form for campus-community relationships

    E-Print Network [OSTI]

    Bowman, Anne (Anne Renee)

    2011-01-01T23:59:59.000Z

    The terms "ivory tower" and "town-gown" have long been used to characterize the relationship between institutions of higher education and the communities in which they reside. While these adversarial phrases reflect the ...

  6. Cooling Water Systems - Energy Savings/Lower Costs By Reusing Cooling Tower Blowdown

    E-Print Network [OSTI]

    Puckorius, P. R.

    1981-01-01T23:59:59.000Z

    Reuse of cooling tower blow down cannot only provide energy conservation, but can provide water conservation and chemical conservation. To be effective, it is critical that the water treatment program be coordinated with the treatment of the blow...

  7. Computer Simulation of Cooling Effect of Wind Tower on Passively Ventilated Building 

    E-Print Network [OSTI]

    Seryak, J.; Kissock, J. K.

    2002-01-01T23:59:59.000Z

    Traditional buildings are cooled and ventilated by mechanically induced drafts. Natural ventilation aspires to cool and ventilate a building by natural means, such as cross ventilation or wind towers, without mechanical equipment. A simple computer...

  8. Estimation of Blade and Tower Properties for the Gearbox Research Collaborative Wind Turbine

    SciTech Connect (OSTI)

    Bir, G.S.; Oyague, F.

    2007-11-01T23:59:59.000Z

    This report documents the structural and modal properties of the blade and tower of a 3-bladed 750-kW upwind turbine to develop an aeroelastic model of the wind turbine.

  9. Exquisite corpse: a tower for the public in the era of exhausted modernity

    E-Print Network [OSTI]

    Jang, Sungwoo

    2012-01-01T23:59:59.000Z

    Towers in Manhattan, especially in business areas, have historically used a single overarching system in order to visualize images of their corporate identity and immerse the public in the image of development. While using ...

  10. Microsoft Word - CX-Driscoll-Naselle-TowerMove-FY13_WEB.doc

    Broader source: Energy.gov (indexed) [DOE]

    3 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Stacie Hensley Project Manager - TEP-TPP-4 Proposed Action: Driscoll-Naselle No. 1 Tower Relocation Project...

  11. Upgraded HFIR Fuel Element Welding System

    SciTech Connect (OSTI)

    Sease, John D [ORNL

    2010-02-01T23:59:59.000Z

    The welding of aluminum-clad fuel plates into aluminum alloy 6061 side plate tubing is a unique design feature of the High Flux Isotope Reactor (HFIR) fuel assemblies as 101 full-penetration circumferential gas metal arc welds (GMAW) are required in the fabrication of each assembly. In a HFIR fuel assembly, 540 aluminum-clad fuel plates are assembled into two nested annular fuel elements 610 mm (24-inches) long. The welding process for the HFIR fuel elements was developed in the early 1960 s and about 450 HFIR fuel assemblies have been successfully welded using the GMAW process qualified in the 1960 s. In recent years because of the degradation of the electronic and mechanical components in the old HFIR welding system, reportable defects in plate attachment or adapter welds have been present in almost all completed fuel assemblies. In October 2008, a contract was awarded to AMET, Inc., of Rexburg, Idaho, to replace the old welding equipment with standard commercially available welding components to the maximum extent possible while maintaining the qualified HFIR welding process. The upgraded HFIR welding system represents a major improvement in the welding system used in welding HFIR fuel elements for the previous 40 years. In this upgrade, the new inner GMAW torch is a significant advancement over the original inner GMAW torch previously used. The innovative breakthrough in the new inner welding torch design is the way the direction of the cast in the 0.762 mm (0.030-inch) diameter aluminum weld wire is changed so that the weld wire emerging from the contact tip is straight in the plane perpendicular to the welding direction without creating any significant drag resistance in the feeding of the weld wire.

  12. Thermodynamic modeling and optimization of a screw compressor chiller and cooling tower system

    E-Print Network [OSTI]

    Graves, Rhett David

    2004-09-30T23:59:59.000Z

    THERMODYNAMIC MODELING AND OPTIMIZATION OF A SCREW COMPRESSOR CHILLER AND COOLING TOWER SYSTEM A Thesis by RHETT DAVID GRAVES Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements... for the degree of MASTER OF SCIENCE December 2003 Major Subject: Mechanical Engineering THERMODYNAMIC MODELING AND OPTIMIZATION OF A SCREW COMPRESSOR CHILLER AND COOLING TOWER SYSTEM A Thesis by RHETT DAVID GRAVES Submitted to Texas A&M University in partial...

  13. Explosive Demolition of a Fire-Water Tower At East Tennessee Technology Park, Oak Ridge TN

    SciTech Connect (OSTI)

    Brooksbank, R.D.; Rood, M.S.; Amrit, S.K.; Harper, M.S.; Dypolt, D.J.; Brehse, Mike [Bechtel Jacobs Company LLC, P.O. Box 4699 Oak Ridge, TN 37931 (United States)

    2008-01-15T23:59:59.000Z

    On June 17, 2006, the Department of Energy (DOE) successfully demolished a {approx}60 year old fire-water tower (K-1206-E), located at the East Tennessee Technology Park (ETTP) in Oak Ridge, TN, using strategically placed explosive charges. The subject demolition project was executed by MCM Management Corporation and Demolition Dynamics under the management of DoE's prime contractor Bechtel Jacobs Company LLC (BJC). The K-1206-E Fire Water Tower (Tower) supported the ETTP fire water protection system from the mid- 1950's until 1991. The 378,500-L (100,000-gallon) Tower, elevated 53-m (175-feet) above grade, was located in a grassy area within 152-m (500-feet) of several other occupied facilities. Electrical, control circuits and supply water servicing the Tower were deactivated in 2003. Free liquids and sludge were removed from the tank prior to demolition. Demolition of a facility employing explosive demolition at a federal site in the 'post-9/11 era' was a substantial challenge. The subject paper discusses: - the planning and coordination steps that were taken to successfully overcome the challenges prior to the demolition of the empty, deactivated Tower; - the method used for the engineered demolition of the Tower; and - the factors responsible for the successful execution of this demolition project. At least two previous attempts were made to demolish the Tower. In the first attempt, the execution of the project was deferred by the re-allocation of funds. In the subsequent attempt in 2004, the execution of this project was postponed due to concerns that an adjacent facility would have to shut down operations during the duration of mobilization and execution of the project and thereby incur potential financial losses. A total of 51 cubic meters (1,800 cubic feet) of demolition debris was generated, which was compliantly disposed of at a local landfill followed by site restoration.

  14. Surface and Tower Meteorological Instrumentation at Barrow (METTWR4H) Handbook

    SciTech Connect (OSTI)

    Ritsche, MT

    2008-04-01T23:59:59.000Z

    The Barrow meteorology station (BMET) uses mainly conventional in situ sensors mounted at four different heights (2m, 10m, 20m and 40m) on a 40 m tower to obtain profiles of wind speed, wind direction, air temperature, dew point and humidity. It also obtains barometric pressure, visibility and precipitation data from sensors at the base of the tower. Additionally, a Chilled Mirror Hygrometer and an Ultrasonic wind speed sensor are located near the 2m level for comparison purposes.

  15. Environmental assessment for the proposed CMR Building upgrades at the Los Alamos National Laboratory, Los Alamos, New Mexico. Final document

    SciTech Connect (OSTI)

    NONE

    1997-02-04T23:59:59.000Z

    In order to maintain its ability to continue to conduct uninterrupted radioactive and metallurgical research in a safe, secure, and environmentally sound manner, the US Department of Energy (DOE) proposes to upgrade the Los Alamos National Laboratory (LANL) Chemistry and Metallurgy Research (CMR) Building. The building was built in the early 1950s to provide a research and experimental facility for analytical chemistry, plutonium and uranium chemistry, and metallurgy. Today, research and development activities are performed involving nuclear materials. A variety of radioactive and chemical hazards are present. The CMR Building is nearing the end of its original design life and does not meet many of today`s design codes and standards. The Proposed Action for this Environmental Assessment (EA) includes structural modifications to some portions of the CMR Building which do not meet current seismic criteria for a Hazard Category 2 Facility. Also included are upgrades and improvements in building ventilation, communications, monitoring, and fire protection systems. This EA analyzes the environmental effects of construction of the proposed upgrades. The Proposed Action will have no adverse effects upon agricultural and cultural resources, wetlands and floodplains, endangered and threatened species, recreational resources, or water resources. The Proposed Action would have negligible effects on human health and transportation, and would not pose a disproportionate adverse health or environmental impact on minority or low-income populations within an 80 kilometer (50 mile) radius of the CMR Building.

  16. IDIQ DOE ESPC Contract Modifications

    Broader source: Energy.gov [DOE]

    Documents display Amendment of Solicitation/Modification of Contract forms for indefinite-delivery, indefinite-quantity (IDIQ) U.S. Department of Energy (DOE) energy savings performance contracts (ESPCs).

  17. Experimental study on the performance of a regeneration tower for various climatic conditions

    SciTech Connect (OSTI)

    Ertas, A.; Kiris, I.; Anderson, E.E. (Texas Tech Univ., Lubbock, TX (United States)); Gandhidasan, P. (King Fahd Univ. of Petroleum Minerals, Dhahran (Saudi Arabia))

    1994-07-01T23:59:59.000Z

    In recent years attempts have been made to use packed towers for regenerating weak liquid desiccants in desiccant cooling or drying processes. For regeneration of desiccants, a counter-flow packed regeneration tower in conjunction with a humidifier has been designed and constructed. The tower was packed with plastic Intalox Snowflake packing material. Experimental measurements of the regeneration tower performance utilizing a new cost effective liquid desiccant mixture CELD (comprised of 50% of lithium chloride and 50% calcium chloride by weight) have been carried out. The average summer climatic conditions for Oklahoma (dry-bulb temperature of 32.22[degrees]C and relative humidity of 60%), Texas (dry-bulb temperature of 32.22[degrees]C and relative humidity of 70%), and Florida (dry-bulb temperature of 32.22[degrees]C and relative humidity of 80%) were simulated with air inlet condition to the tower. The effect of desiccant inlet temperature, inlet concentration, and flow rate on the regeneration tower performance has been investigated.

  18. The Jefferson Lab 12 GeV Upgrade

    SciTech Connect (OSTI)

    R.D. McKeown

    2011-10-01T23:59:59.000Z

    A major upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Facility is in progress. Construction began in 2008 and the project should be completed in 2015. The upgrade includes doubling the energy of the electron beam to 12 GeV, the addition of a new fourth experimental hall, and new experimental equipment in three of the experimental halls. A brief overview of this upgrade project is presented along with some highlights of the anticipated experimental program.

  19. AMI FW UPGRADEABILITY TEST PROCEDURE AND SECURITY ASSESSMENT

    SciTech Connect (OSTI)

    Snyder, Isabelle B [ORNL] [ORNL

    2014-01-01T23:59:59.000Z

    The National Institute of Standards and Technology (NIST) is producing NISTIR 7823 to define test requirements for Smart Meter upgradability. The term Smart Meter refers specifically to advanced electric meters being deployed to enhance management of electricity distribution for residential and industrial consumers. The underlying functional and security requirements for Smart Meter upgradability are specified in NEMA standard SG-AMI 1-2009. The purpose of NISTIR 7823 is to describe conformance test requirements that may be used voluntarily by testers and/or test laboratories to determine whether Smart Meters and Upgrade Management Systems conform to the requirements of NEMA SG-AMI 1-2009.

  20. Superconducting RF Lab Facility Upgrades at Los Alamos

    SciTech Connect (OSTI)

    Katonak, D.J.; Rusnak, B.

    1999-03-01T23:59:59.000Z

    Research and testing of multi-cell superconducting cavities demands extensive contamination control resources to achieve high-cavity fields. Facility upgrades at Los Alamos National Laboratory (LANL) included the modernization of test equipment, expanding and modernizing cleanroom facilities, improving safety, and expanding the high-pressure rinse cleaning process equipment. Each upgrade was integrated into the facility to enable users to assemble prototype cryomodules. The scope of the upgrades, the new installed capability, and budget and schedule for certain aspects of the project are discussed in this paper.

  1. Upgrading of petroleum oil feedstocks using alkali metals and hydrocarbons

    DOE Patents [OSTI]

    Gordon, John Howard

    2014-09-09T23:59:59.000Z

    A method of upgrading an oil feedstock by removing heteroatoms and/or one or more heavy metals from the oil feedstock composition. This method reacts the oil feedstock with an alkali metal and an upgradant hydrocarbon. The alkali metal reacts with a portion of the heteroatoms and/or one or more heavy metals to form an inorganic phase separable from the organic oil feedstock material. The upgradant hydrocarbon bonds to the oil feedstock material and increases the number of carbon atoms in the product. This increase in the number of carbon atoms of the product increases the energy value of the resulting oil feedstock.

  2. Dynamic Resource Allocation with the arcControlTower

    E-Print Network [OSTI]

    Filipcic, Andrej; The ATLAS collaboration; Nilsen, Jon Kerr

    2015-01-01T23:59:59.000Z

    Distributed computing resources available for high-energy physics research are becoming less dedicated to one type of workflow and researchers’ workloads are increasingly exploiting modern computing technologies such as parallelism. The current pilot job management model used by many experiments relies on static dedicated resources and cannot easily adapt to these changes. The model used for ATLAS in Nordic countries and some other places enables a flexible job management system based on dynamic resources allocation. Rather than a fixed set of resources managed centrally, the model allows resources to be requested on the fly. The ARC Computing Element (ARC-CE) and ARC Control Tower (aCT) are the key components of the model. The aCT requests jobs from the ATLAS job management system (PanDA) and submits a fully-formed job description to ARC-CEs. ARC-CE can then dynamically request the required resources from the underlying batch system. In this paper we describe the architecture of the model and the experienc...

  3. CHEP2015: Dynamic Resource Allocation with arcControlTower

    E-Print Network [OSTI]

    Filipcic, Andrej; The ATLAS collaboration; Nilsen, Jon Kerr

    2015-01-01T23:59:59.000Z

    Distributed computing resources available for high-energy physics research are becoming less dedicated to one type of workflow and researchers’ workloads are increasingly exploiting modern computing technologies such as parallelism. The current pilot job management model used by many experiments relies on static dedicated resources and cannot easily adapt to these changes. The model used for ATLAS in Nordic countries and some other places enables a flexible job management system based on dynamic resources allocation. Rather than a fixed set of resources managed centrally, the model allows resources to be requested on the fly. The ARC Computing Element (ARC-CE) and ARC Control Tower (aCT) are the key components of the model. The aCT requests jobs from the ATLAS job mangement system (Panda) and submits a fully-formed job description to ARC-CEs. ARC-CE can then dynamically request the required resources from the underlying batch system. In this paper we describe the architecture of the model and the experience...

  4. Capturing Energy Efficiency Upgrades in the Real Estate Transaction

    Broader source: Energy.gov [DOE]

    "Capturing Energy Efficiency Upgrades in the Real Estate Transaction," by Residential Energy Efficiency Solutions, July 10, 2012. Describes the concept of a residential MPG number as a simple way of describing a home’s energy consumption.

  5. Using QECBs for Street Lighting Upgrades: Lighting the Way to...

    Broader source: Energy.gov (indexed) [DOE]

    Summarizes how the City of San Diego leveraged 13.1 million in qualified energy conservation bonds to increase the size of a street lighting upgrade project. Author: Lawrence...

  6. Financing Energy Upgrades for K-12 School Districts

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 11, 2013 and dealing with how to finance energy efficiency upgrades for K-12 school districts.

  7. Energy and Emissions Savings through Insulation Upgrade Projects

    E-Print Network [OSTI]

    Lettich, M.

    2008-01-01T23:59:59.000Z

    The presentation demonstrates the value of including insulation system assessment, repairs and upgrades on a facility's physical function and its importance in the overall energy and environmental management program. Financial and environmental...

  8. Financing; A Cost Effective Alternative When Upgrading Energy Efficient Systems

    E-Print Network [OSTI]

    Ertle, J. M.

    in order to effectively compete in the marketplace. One obvious method of reducing costs and improving productivity is to upgrade old, antiquated equipment such as lighting to more modern energy efficient systems. Most projects provide a return...

  9. Biofuels from Corn Stover: Pyrolytic Production and Catalytic Upgrading Studies 

    E-Print Network [OSTI]

    Capunitan, Jewel Alviar

    2013-01-15T23:59:59.000Z

    Due to security issues in energy supply and environmental concerns, renewable energy production from biomass becomes an increasingly important area of study. Thus, thermal conversion of biomass via pyrolysis and subsequent upgrading procedures were...

  10. Honeymoons Lead to Upgrades in Western Vermont | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    month at a low interest rate. "We believe clients view this lag time as an added bonus to the other benefits they are experiencing with energy efficiency upgrades" says...

  11. Microsoft Word - CX-Olympia-SouthElma_upgrades_WEB.doc

    Broader source: Energy.gov (indexed) [DOE]

    0, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: The project consists of upgrades to the...

  12. J.R. Simplot: Burner Upgrade Project Improves Performance and...

    Broader source: Energy.gov (indexed) [DOE]

    how the J.R. Simplot Company saved energy and money by increasing the efficiency of the steam system in its potato processing plant in Caldwell, Idaho. J.R. Simplot: Burner Upgrade...

  13. Providing protection: Agencies receive funding to repair, upgrade dams

    E-Print Network [OSTI]

    Wythe, Kathy

    2009-01-01T23:59:59.000Z

    Story by Kathy Wythe tx H2O | pg. 26 Providing protection Agencies receive funding to repair, upgrade dams along with local partners, can apply for grant funds, he said. Construction of the dams began through four federal authorizations..., called floodwater retarding structures and built mostly in rural areas during the 1950s to 1970s, are aging and need repairing. Others now protect urban areas that have developed downstream and need upgrading to meet more stringent safety standards...

  14. Upgrade Your Lighting & Open the Door to Energy Savings

    E-Print Network [OSTI]

    Houcek, J. K.

    2006-01-01T23:59:59.000Z

    Upgrade Your Lighting & Open the Door to Energy Savings John K. Houcek, Energy Monitoring & Analysis Services The purpose of this paper is to convince the reader that the time has come to take a close look at the lighting energy usage... savings as well as payback periods. There is no single lighting upgrade solution that covers such a wide variety of facility types. Next, a methodology is presented that describes the lighting audit process from the initial survey to the final report...

  15. National Spherical Torus Experiment (NSTX) Center Stack Upgrade

    SciTech Connect (OSTI)

    Neumeyer, C; Chrzanowski, J; Dudek, L; Fan, H; Hatcher, R; Heitzenroeder, P; Menard, J; Ono, M; Ramakrishnan, S; Titus, P; Woolley, R

    2009-09-24T23:59:59.000Z

    The purpose of the NSTX Center Stack Upgrade project is to expand the NSTX operational space and thereby the physics basis for next-step ST facilities. The plasma aspect ratio (ratio of plasma major to minor radius) of the upgrade is increased to 1.5 from the original value of 1.26, which increases the cross sectional area of the center stack by a factor of ~ 3 and makes possible higher levels of performance and pulse duration.

  16. Commissioning results from the recently upgraded RHIC LLRF system

    SciTech Connect (OSTI)

    Smith, K.S.; Harvey, M.; Hayes, T.; Narayan, G.; Severino, F.; Yuan, S.; Zaltsman, A.

    2011-03-28T23:59:59.000Z

    During RHIC Run 10, the first phase of the LLRF Upgrade was successfully completed. This involved replacing the aging VME based system with a modern digital system based on the recently developed RHIC LLRF Upgrade Platform, and commissioning the system as part of the normal RHIC start up process. At the start of Run 11, the second phase of the upgrade is underway, involving a significant expansion of both hardware and functionality. This paper will review the commissioning effort and provide examples of improvements in system performance, flexibility and scalability afforded by the new platform. The RHIC LLRF upgrade is based on the recently developed RHIC LLRF Upgrade Platform. The major design goals of the platform are: (1) Design a stand alone, generic, digital, modular control architecture which can be configured to satisfy all of the application demands we currently have, and which will be supportable and upgradeable into the foreseeable future; and (2) It should integrate seamlessly into existing controls infrastructure, be easy to deploy, provide access to all relevant control parameters (eliminate knobs), provide vastly improved diagnostic data capabilities, and permit remote reconfiguration. Although the system is still in its infancy, we think the initial commissioning results from RHIC indicate that these goals have been achieved, and that we've only begun to realize the benefits the platform provides.

  17. Optical Link ASICs for the LHC Upgrade

    E-Print Network [OSTI]

    K. K. Gan; H. P. Kagan; R. D. Kass; J. R. Moore; D. S. Smith

    2009-11-23T23:59:59.000Z

    We have designed three ASICs for possible applications in the optical links of a new layer of pixel detector in the ATLAS experiment for the first phase of the LHC luminosity upgrade. The ASICs include a high-speed driver for the VCSEL, a receiver/decoder to decode the signal received at the PIN diode to extract the data and clock, and a clock multiplier to produce a higher frequency clock to serialize the data for transmission. These ASICs were designed using a 130 nm CMOS process to enhance the radiation-hardness. We have characterized the fabricated ASICs and the submission has been mostly successful. We irradiated the ASICs with 24 GeV/c protons at CERN to a dosage of 70 Mrad. We observed no significant degradation except the driver circuit in the VCSEL driver fabricated using the thick oxide process in order to provide sufficient voltage to drive a VCSEL. The degradation is due to a large threshold shifts in the PMOS transistors used.

  18. Combination process for upgrading residual oils

    SciTech Connect (OSTI)

    Busch, L.E.; Walters, P.W.; Zandona, O.

    1990-01-16T23:59:59.000Z

    This patent describes a method for upgrading high boiling residual portions of crude oils comprising metal contaminants, porphyrins, asphaltenes and high molecular weight multi-ring hydrocarbon material. It comprises: charging a high boiling residual portion of crude oil admixed with diluent in contact with suspended upflowing substantially inert fluidizable solids particulate material at an elevated thermal visbreaking temperature in a riser contact zone for a time sufficient to recover therefrom a vaporous hydrocarbon product higher boiling than gasoline partially decarbonized and demetallized to a lower contaminating metals level, quenching the vaporous product of thermal visbreaking below its dew point after separation from solids, charging quenched thermally modified high boiling hydrocarbon product with a crystalline zeolite cracking catalyst under cracking conditions for a hydrocarbon residence time in a riser cracking zone; recovering a hydrocarbon conversion product; separating a combined C{sub 4} minus wet gas product stream of the visbreaking and zeolite catalyst cracking operating to recover a C{sub 3}-C{sub 4} rich fraction separately from a C{sub 2} minus dry gas product fraction, and regenerating the crystalline zeolite contcontaining catalyst.

  19. Screening of processing and upgrading schemes

    SciTech Connect (OSTI)

    Not Available

    1991-10-01T23:59:59.000Z

    The RFP was predicated on DOE's desire to enhance the development of advanced transportation fuels made from coal via a program to process mild coal gasification (MCG) liquids into high volumetric energy density (HEDF) test fuels. The desired product fuels were to be cost effectively manufactured, have high volumetric energy density, and be hydrocarbon-based for existing and prototype turbine and diesel engines. The sources for these special fuels consist of the abundant and secure indigenous energy resources of coal. Comparison studies were also to be made using other non-petroleum fossil fuels such as shale oil and tar sands bitumen. METC has concluded that MCG technology has the potential to simultaneously satisfy the transportation and power generation fuel needs in the most cost-effective manner. MCG is based on low temperature pyrolysis, a technique known to the coal community for over a century. Most past pyrolysis developments were aimed at maximizing the liquids yield which results in a low quality tarry product requiring significant and capital intensive upgrading. By properly tailoring the pyrolysis severity to control the liquid yield-liquid quality relationship, it has been found that a higher quality distillate-boiling liquid can be readily skimmed'' from the coal. The resultant liquids have a much higher H/C ratio than conventional pyrolytic tars and therefore can be hydroprocessed at lower cost. These liquids are also extremely enriched in 1-, 2-, and 3-ring aromatics.

  20. Process for upgrading tar sand bitumen

    SciTech Connect (OSTI)

    Bartholic, D.B.; Reagan, W.J.

    1989-04-04T23:59:59.000Z

    A process is described for upgrading a charge of a tar sand bitumen concentrate containing mineral matter including fine particles which comprises contacting the charge in a riser in the presence of a low boiling organic solvent diluent with finely divided attrition-resistant particles of a hot fluidizable substantially catalytically inert solid which is substantially chemically inert to a solution of mineral acid. The contact of the charge with the particles is at high temperature and short contact time to vaporize the high hydrogen containing components of the bitumen, the period of time being less than that which induces substantial thermal cracking of the charge, at the end of the time separating the vaporizing product from the fluidizable particles. The fluidizable particles now bear a deposit of both combustible solid, adherent particles of fine particles of mineral matter and metals. The particles of inert solid are passed with deposit of combustibles and fine particles of mineral matter to a regenerator to oxidize the combustible portion of the deposits, removing at least a portion of deposit of mineral matter and metals by removing the inert solid from the regenerator and contacting removed inert solid with a hot mineral acid, and recirculating fluidizable solid depleted at least in part of deposited mineral matter to contact with incoming charge of tar sand bitumen concentrate and diluent.

  1. Process for upgrading tar sand bitumen

    SciTech Connect (OSTI)

    Bartholic, D.B.; Reagan, W.J.

    1989-02-14T23:59:59.000Z

    A process is described for upgrading a charge of a tar sand bitumen concentrate containing metal impurities, colloidal calcium-containing clay and water. It consists of contacting the charge in a riser contacting zone in the presence of a low boiling organic solvent with hot fluidizable attrition-resistant substantially catalytically-inert microspheres, which are 20 to 150 microns in diameter and are composed of previously calcined kaolin clay. The contact takes place at high temperature and short contact time, which permits vaporization of the high hydrogen containing components of the bitumen. The period of time is less than that which induces substantial thermal cracking of the charge. At the end of the time the vaporized produce is separated from the microspheres of calcined kaolin clay, the microspheres of calcined kaolin clay now bearing a deposit of combustible solid, metal impurities and adherent particles of colloidal calcium-containing clay originally contained in the bitumen concentrate, immediately reducing the temperature of the vaporized product to minimize thermal cracking and recovering the product for further refining to produce one or more premium products.

  2. Upgrade to the Birmingham Irradiation Facility

    E-Print Network [OSTI]

    Dervan, P; Hodgson, P; Marin- Reyes; Parker, K; Wilson, J; Baca, M

    2015-01-01T23:59:59.000Z

    The Birmingham Irradiation Facility was developed in 2013 at the University of Birmingham using the Medical Physics MC40 cyclotron. It can achieve High Luminosity LHC (HL-LHC) fluences of 10^15 (1 MeV neutron equivalent (neq)) cm^-2 in 80 s with proton beam currents of 1 ?A and so can evaluate effectively the performance and durability of detector technologies and new components to be used for the HL-LHC. Irradiations of silicon sensors and passive materials can be carried out in a temperature controlled cold box which moves continuously through the homogenous beamspot. This movement is provided by a pre-configured XY-axis Cartesian robot scanning system. In 2014 the cooling system and cold box were upgraded from a recirculating glycol chiller system to a liquid nitrogen evaporative system. The new cooling system achieves a stable temperature of 50 1C in 30 min and aims to maintain sub-0 1C temperatures on the sensors during irradiations. This paper reviews the design, development, commissioning and perform...

  3. Syngas Upgrading to Hydrocarbon Fuels Technology Pathway

    SciTech Connect (OSTI)

    Talmadge, M.; Biddy, Mary J.; Dutta, Abhijit; Jones, Susanne B.; Meyer, Pimphan A.

    2013-03-31T23:59:59.000Z

    In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to hydrocarbon fuels to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This pathway case investigates the upgrading of biomass derived synthesis gas (‘syngas’) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and risk adverse conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas to hydrocarbon pathway to be competitive with petroleum-derived gasoline, diesel and jet range blendstocks.

  4. NSTX Program Overview andNSTX Program Overview and NSTX Upgrade Physics Design ProgressNSTX Upgrade Physics Design Progress

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    -B318, PPPL NSTXNSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INL in Upgrade 6. Develop normally-conducting radiation-tolerant magnets for ST applications · Desig

  5. Industrial Waste Landfill IV upgrade package

    SciTech Connect (OSTI)

    Not Available

    1994-03-29T23:59:59.000Z

    The Y-12 Plant, K-25 Site, and ORNL are managed by DOE`s Operating Contractor (OC), Martin Marietta Energy Systems, Inc. (Energy Systems) for DOE. Operation associated with the facilities by the Operating Contractor and subcontractors, DOE contractors and the DOE Federal Building result in the generation of industrial solid wastes as well as construction/demolition wastes. Due to the waste streams mentioned, the Y-12 Industrial Waste Landfill IV (IWLF-IV) was developed for the disposal of solid industrial waste in accordance to Rule 1200-1-7, Regulations Governing Solid Waste Processing and Disposal in Tennessee. This revised operating document is a part of a request for modification to the existing Y-12 IWLF-IV to comply with revised regulation (Rule Chapters 1200-1-7-.01 through 1200-1-7-.08) in order to provide future disposal space for the ORR, Subcontractors, and the DOE Federal Building. This revised operating manual also reflects approved modifications that have been made over the years since the original landfill permit approval. The drawings referred to in this manual are included in Drawings section of the package. IWLF-IV is a Tennessee Department of Environmental and Conservation/Division of Solid Waste Management (TDEC/DSWM) Class 11 disposal unit.

  6. 24 m meteorological tower data report period: January through December, 1996

    SciTech Connect (OSTI)

    Freeman, D.; Bowen, J.; Egami, R.; Coulombe, W.; Crow, D.; Cristani, B.; Schmidt, S.

    1997-12-01T23:59:59.000Z

    This report was prepared by the Desert Research Institute (DRI) for the US Department of Energy (DOE). It summarizes meteorological data collected at the 24 meter tower at the Nevada Test Site Hazardous Material Spill Center (HAZMAT) located at Frenchman Flat near Mercury, Nevada, approximately 75 miles northwest of Las Vegas, Nevada. The tower was originally installed in July, 1993 to characterize baseline conditions for an EPA sponsored experimental research program at the HAZMAT. This report presents results of the monitoring for January--December, 1996, providing: a status of the measurement systems during the report period and a summary of the meteorological conditions at the HAZMAT during the report period. The scope of the report is limited to summary data analyses and does not include extensive meteorological analysis. The tower was instrumented at 8 levels. Wind speed, wind direction, and temperature were measured at all 8 levels. Relative humidity was measured at 3 levels. Solar and net radiation were measured at 2 meters above the ground. Barometric pressure was measured at the base of the tower and soil temperature was measured near the base of the tower.

  7. Upgrade to the control system of the reflectometry diagnostic of ASDEX upgrade

    SciTech Connect (OSTI)

    Graca, S.; Santos, J.; Manso, M.E. [Associacao EURATOM/IST, Centro de Fusao Nuclear, Instituto Superior Tecnico, 1049-001 Lisbon (Portugal)

    2004-10-01T23:59:59.000Z

    The broadband frequency modulation-continuous wave microwave/millimeter wave reflectometer of ASDEX upgrade tokamak (Institut fuer Plasma Physik (IPP), Garching, Germany) developed by Centro de Fusao Nuclear (Lisboa, Portugal) with the collaboration of IPP, is a complex system with 13 channels (O and X modes) and two types of operation modes (swept and fixed frequency). The control system that ensures remote operation of the diagnostic incorporates VME and CAMAC bus based acquisition/timing systems. Microprocessor input/output boards are used to control and monitor the microwave circuitry and associated electronic devices. The implementation of the control system is based on an object-oriented client/server model: a centralized server manages the hardware and receives input from remote clients. Communication is handled through transmission control protocol/internet protocol sockets. Here we describe recent upgrades of the control system aiming to: (i) accommodate new channels; (ii) adapt to the heterogeneity of computing platforms and operating systems; and (iii) overcome remote access restrictions. Platform and operating system independence was achieved by redesigning the graphical user interface in JAVA. As secure shell is the standard remote access protocol adopted in major fusion laboratories, secure shell tunneling was implemented to allow remote operation of the diagnostic through the existing firewalls.

  8. STAR inner tracking upgrade - A performance study

    E-Print Network [OSTI]

    Jan Kapitan; for the STAR Collaboration

    2009-01-19T23:59:59.000Z

    Anisotropic flow measurements have demonstrated development of partonic collectivity in $200\\mathrm{GeV}$ Au+Au collisions at RHIC. To understand the partonic EOS, thermalization must be addressed. Collective motion of heavy-flavor (c,b) quarks can be used to indicate the degree of thermalization of the light-flavor quarks (u,d,s). Measurement of heavy-flavor quark collectivity requires direct reconstruction of heavy-flavor hadrons in the low $\\pt$ region. Measurement of open charm spectra to high $\\pt$ can be used to investigate heavy-quark energy loss and medium properties. The Heavy Flavor Tracker (HFT), a proposed upgrade to the STAR experiment at midrapidity, will measure $v_{2}$ of open-charm hadrons to very low $\\pt$ by reconstructing their displaced decay vertices. The innermost part of the HFT is the PIXEL detector (made of two low mass monolithic active pixel sensor layers), which delivers a high precision position measurement close to the collision vertex. The Intermediate Silicon Tracker (IST), a 1-layer strip detector, is essential to improve hit identification in the PIXEL detector when running at full RHIC-II luminosity. Using a full GEANT simulation, open charm measurement capabilities of STAR with the HFT will be shown. Its performance in a broad $\\pt$ range will be demonstrated on $v_{2}$ ($\\pt > 0.5\\mathrm{GeV}/c$) and $R_\\mathrm{CP}$ ($\\pt < 10\\mathrm{GeV}/c$) measurements of $\\D$ meson. Results of reconstruction of $\\Lc$ baryon in heavy-ion collisions are presented.

  9. Brayton-Cycle Baseload Power Tower CSP System

    SciTech Connect (OSTI)

    Anderson, Bruce

    2013-12-31T23:59:59.000Z

    The primary objectives of Phase 2 of this Project were: 1. Engineer, fabricate, and conduct preliminary testing on a low-pressure, air-heating solar receiver capable of powering a microturbine system to produce 300kWe while the sun is shining while simultaneously storing enough energy thermally to power the system for up to 13 hours thereafter. 2. Cycle-test a high-temperature super alloy, Haynes HR214, to determine its efficacy for the system’s high-temperature heat exchanger. 3. Engineer the thermal energy storage system This Phase 2 followed Wilson’s Phase 1, which primarily was an engineering feasibility study to determine a practical and innovative approach to a full Brayton-cycle system configuration that could meet DOE’s targets. Below is a summary table of the DOE targets with Wilson’s Phase 1 Project results. The results showed that a Brayton system with an innovative (low pressure) solar receiver with ~13 hours of dry (i.e., not phase change materials or molten salts but rather firebrick, stone, or ceramics) has the potential to meet or exceed DOE targets. Such systems would consist of pre-engineered, standardized, factory-produced modules to minimize on-site costs while driving down costs through mass production. System sizes most carefully analyzed were in the range of 300 kWe to 2 MWe. Such systems would also use off-the-shelf towers, blowers, piping, microturbine packages, and heliostats. Per DOE’s instructions, LCOEs are based on the elevation and DNI levels of Daggett, CA, for a 100 MWe power plant following 2 GWe of factory production of the various system components. Success criteria DOE targets Wilson system LCOE DOE’s gas price $6.75/MBtu 9 cents/kWh 7.7 cents/kWh LCOE Current gas price $4.71/MBtu NA 6.9 cents/kWh Capacity factor 75% (6500hr) 75-100% Solar fraction 85% (5585hr) >5585hr Receiver cost $170/kWe $50/kWe Thermal storage cost $20/kWhth $13/kWhth Heliostat cost $120/m2 $89.8/m2

  10. J. Adv. Model. Earth Syst., Vol. 2, Art. #8, 19 pp. Adiabatic Rearrangement of Hollow PV Towers

    E-Print Network [OSTI]

    Schubert, Wayne H.

    J. Adv. Model. Earth Syst., Vol. 2, Art. #8, 19 pp. Adiabatic Rearrangement of Hollow PV Towers potential vorticity (PV). is structure has been referred to as a hollow PV tower. e sign reversal of the radial gradient of PV satis es the Charney-Stern necessary condition for combined barotropic

  11. A multi-site analysis of random error in tower-based measurements of carbon and energy fluxes

    E-Print Network [OSTI]

    A multi-site analysis of random error in tower-based measurements of carbon and energy fluxes 2006 Abstract Measured surface-atmosphere fluxes of energy (sensible heat, H, and latent heat, LE of which include ``tall tower'' instrumentation), one grassland site, and one agricultural site, to conduct

  12. LINUDANS -Research and development of high voltage towers. Reykjavik University is working in Collaboration with Linudans, research based company specialized

    E-Print Network [OSTI]

    Karlsson, Brynjar

    LINUDANS - Research and development of high voltage towers. Reykjavik University is working problems regarding the growing energy transport. All products of Linudans are green and environmentally voltage towers is the main focus of Linudans. The company has developed an innovative concept which serves

  13. Measurements near the Atmospheric Surface Flux Group tower at SHEBA: Near-surface conditions and surface energy budget

    E-Print Network [OSTI]

    Persson, Ola

    Group tower at SHEBA: Near-surface conditions and surface energy budget, J. Geophys. Res., 107(C10Measurements near the Atmospheric Surface Flux Group tower at SHEBA: Near-surface conditions and surface energy budget P. Ola G. Persson,1 Christopher W. Fairall,2 Edgar L. Andreas,3 Peter S. Guest,4

  14. SLHC, the High-Luminosity Upgrade (public event)

    ScienceCinema (OSTI)

    None

    2011-10-06T23:59:59.000Z

    In the morning of June 23rd a public event is organised in CERN's Council Chamber with the aim of providing the particle physics community with up-to-date information about the strategy for the LHC luminosity upgrade and to describe the current status of preparation work. The presentations will provide an overview of the various accelerator sub-projects, the LHC physics prospects and the upgrade plans of ATLAS and CMS. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the LHC High Luminosity Upgrade project. Informing the public is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

  15. Upgrade of absolute extreme ultraviolet diagnostic on J-TEXT

    SciTech Connect (OSTI)

    Zhang, X. L.; Cheng, Z. F., E-mail: chengfe@hust.edu.cn; Hou, S. Y.; Zhuang, G.; Luo, J. [State Key Laboratory of Advanced Electromagnetic Engineering and Technology, School of Electrical and Electronic Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China)

    2014-11-15T23:59:59.000Z

    The absolute extreme ultraviolet (AXUV) diagnostic system is used for radiation observation on J-TEXT tokamak [J. Zhang, G. Zhuang, Z. J. Wang, Y. H. Ding, X. Q. Zhang, and Y. J. Tang, Rev. Sci. Instrum. 81, 073509 (2010)]. The upgrade of the AXUV system is aimed to improve the spatial resolution and provide a three-dimensional image on J-TEXT. The new system consists of 12 AXUV arrays (4 AXUV16ELG arrays, 8 AXUV20ELG arrays). The spatial resolution in the cross-section is 21 mm for the AXUV16ELG arrays and 17 mm for the AXUV20ELG arrays. The pre-amplifier is also upgraded for a higher signal to noise ratio. By upgrading the AXUV imaging system, a more accurate observation on the radiation information is obtained.

  16. HOM Survey of the First CEBAF Upgrade Style Cavity Pair

    SciTech Connect (OSTI)

    Marhauser, Frank; Davis, G; Drury, Michael; Grenoble, Christiana; Hogan, John; Manus, Robert; Preble, Joseph; Reece, Charles; Rimmer, Robert; Tian, Kai

    2009-05-01T23:59:59.000Z

    The planned upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Laboratory (JLab) requires ten new superconducting rf (SRF) cavity cryomodules to double the beam energy to the envisaged 12 GeV. Adequate cavity Higher Order Mode (HOM) suppression is essential to avoid multipass, multibunch beam break-up (BBU) instabilities of the recirculating beam. We report on detailed HOM surveys performed for the first two upgrade style cavities tested in a dedicated cavity pair cryomodule at 2K. The safety margin to the BBU threshold budget at 12 GeV has been assessed.

  17. Nuclear power plant security systems - The need for upgrades

    SciTech Connect (OSTI)

    Murskyj, M.P.; Furlow, C.H.

    1989-01-01T23:59:59.000Z

    Most perimeter security systems for nuclear power plants were designed and installed in the late 1970s or early 1980s. This paper explores the need to regularly evaluate and possibly upgrade a security system in the area of perimeter intrusion detection and surveillance. this paper discusses US Nuclear Regulatory Commission audits and regulatory effectiveness reviews (RERs), which have raised issues regarding the performance of perimeter security systems. The audits and RERs identified various degrees of vulnerability in certain aspects of existing perimeter security systems. In addition to reviewing the regulatory concerns, this paper discusses other reasons to evaluate and/or upgrade a perimeter security system.

  18. The 12 GeV JLab Upgrade Project

    SciTech Connect (OSTI)

    Smith, Elton

    2009-01-01T23:59:59.000Z

    The upgrade of the CEBAF Accelerator at Jefferson Lab to 12 GeV will deliver high luminosity and high quality beams, which will open unique opportunities for studies of the quark and gluon structure of hadrons in the valence region. Such physics will be made accessible by substantial additions to the experimental equipment in combination with the increased energy reach of the upgraded machine. The emphasis of the talk will be on the program in a new experimental Hall D designed to search for gluonic excitations.

  19. The 12 GeV JLab Upgrade Project

    E-Print Network [OSTI]

    Elton S. Smith

    2009-01-21T23:59:59.000Z

    The upgrade of the CEBAF Accelerator at Jefferson Lab to 12 GeV will deliver high luminosity and high quality beams, which will open unique opportunities for studies of the quark and gluon structure of hadrons in the valence region. Such physics will be made accessible by substantial additions to the experimental equipment in combination with the increased energy reach of the upgraded machine. The emphasis of the talk will be on the program in a new experimental Hall D designed to search for gluonic excitations.

  20. Simulated and observed fluxes of sensible and latent heat and CO2 at the WLEF-TV tower using SiB2.5

    E-Print Network [OSTI]

    Collett Jr., Jeffrey L.

    Simulated and observed fluxes of sensible and latent heat and CO2 at the WLEF-TV tower using SiB2, Boulder, CO, USA Abstract Three years of meteorological data collected at the WLEF-TV tower were used the WLEF tower, which were not present in the SiB simulation. The model overestimated the magnitude

  1. An Analysis of Building Envelope Upgrades for Residential Energy Efficiency in Hot and Humid Climates

    E-Print Network [OSTI]

    Malhotra, M.; Haberl, J.

    This paper presents the results of the analyses of various envelope upgrades for residential energyefficiency in hot and humid climates. The building components considered for the upgrades include: building shape, construction type, roof...

  2. Q&A: Financing Energy Efficiency Upgrades for Your Home through...

    Office of Environmental Management (EM)

    Q&A: Financing Energy Efficiency Upgrades for Your Home through PowerSaver Loans Q&A: Financing Energy Efficiency Upgrades for Your Home through PowerSaver Loans February 19, 2015...

  3. Motor System Upgrades Smooth the Way to Savings of $700,000 at...

    Broader source: Energy.gov (indexed) [DOE]

    System Upgrades Smooth the Way to Savings of 700,000 at Chevron Refinery Motor System Upgrades Smooth the Way to Savings of 700,000 at Chevron Refinery Chevron, the largest U.S....

  4. Energy Efficiency Upgrades Make a Big Difference to a Small Organizati...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficiency Upgrades Make a Big Difference to a Small Organization Energy Efficiency Upgrades Make a Big Difference to a Small Organization Photo of a man and woman standing outside...

  5. An Analysis of Building Envelope Upgrades for Residential Energy Efficiency in Hot and Humid Climates 

    E-Print Network [OSTI]

    Malhotra, M.; Haberl, J.

    2006-01-01T23:59:59.000Z

    This paper presents the results of the analyses of various envelope upgrades for residential energyefficiency in hot and humid climates. The building components considered for the upgrades include: building shape, construction ...

  6. Upgrade of the PNNL TEPC and Multisphere Spectrometer

    SciTech Connect (OSTI)

    Scherpelz, Robert I.; Conrady, Matthew M.

    2008-09-10T23:59:59.000Z

    The Pacific Northwest National Laboratory (PNNL) has used two types of instruments, the tissue equivalent proportional counter (TEPC) and the multisphere spectrometer for characterizing neutron radiation fields in support of neutron dosimetry at the Hanford site. The US Department of Energy recently issued new requirements for radiation protection standards in 10 CFR 835 which affect the way that neutron dose equivalent rates are evaluated. In response to the new requirements, PNNL has upgraded the analyses used in conjunction with the TEPC and multisphere. The analysis software for the TEPC was modified for this effort, and a new analysis code was selected for the multisphere. These new analysis techniques were implemented and tested with measurement data that had been collected in previous measurements. In order to test the effectiveness of the changes, measurements were taken in PNNL’s Low Scatter Room using 252Cf sources in both unmoderated and D2O-moderated configurations that generate well-characterized neutron fields. The instruments were also used at Los Alamos National Laboratory (LANL), in their Neutron Free-in-Air calibration room, also using neutron sources that generate well-characterized neutron fields. The results of the software modifications and the measurements are documented in this report. The TEPC measurements performed at PNNL agreed well with accepted dose equivalent rates using the traditional analysis, agreeing with the accepted value to within 13% for both unmoderated and moderated 252Cf sources. When the new analysis was applied to the TEPC measurement data, the results were high compared to the new accepted value. A similar pattern was seen for TEPC measurements at LANL. Using the traditional analysis method, results for all neutron sources showed good agreement with accepted values, nearly always less than 10%. For the new method of analysis, however, the TEPC responded with higher dose equivalent rates than accepted, by as much as 25%. The reason for the overresponse is that there is very little attenuation of the neutrons by tissue, so it cannot match the effect of attenuation by 1 cm of tissue called for in the new standards. This could be corrected with a modified instrument with a thicker wall, or by analytical means that would need to be developed. The multisphere spectrometer performed reasonably well both at PNNL and at LANL. It could produce a neutron spectrum that was similar to the accepted spectrum, and total flux values were usually within 15% of the accepted values. Dose equivalent rates were usually within 18% of the accepted values. The average energies, however, were usually lower than the accepted values. The performance of this instrument could be much better than seen in this study. If PNNL were to add some moderating spheres to its measurement set and calculate a new set of instrument response functions, performance could be improved. The multisphere could then be a more useful instrument for assessing the dose equivalent rate in the workplace.

  7. LQG control of horizontal wind turbines for blades and tower loads alleviation

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    LQG control of horizontal wind turbines for blades and tower loads alleviation A. Pintea*, N of power produced by two bladed horizontal variable speed wind turbines. The proposed controller ensures not only an optimal operation of turbines but also enables a compromise with the minimization of the blade

  8. Closing the carbon budget of estuarine wetlands with tower-based measurements and MODIS time series

    E-Print Network [OSTI]

    Chen, Jiquan

    Closing the carbon budget of estuarine wetlands with tower-based measurements and MODIS time series, Institute of Biodiversity Science, Fudan University, Shanghai 200433, China, wDepartment of Environmental have distinct carbon flux dynamics ­ the lateral carbon flux incurred by tidal activities, and methane

  9. Conceptual Design of a 100 MWe Modular Molten Salt Power Tower Plant

    SciTech Connect (OSTI)

    James E. Pacheco; Carter Moursund, Dale Rogers, David Wasyluk

    2011-09-20T23:59:59.000Z

    A conceptual design of a 100 MWe modular molten salt solar power tower plant has been developed which can provide capacity factors in the range of 35 to 75%. Compared to single tower plants, the modular design provides a higher degree of flexibility in achieving the desired customer's capacity factor and is obtained simply by adjusting the number of standard modules. Each module consists of a standard size heliostat field and receiver system, hence reengineering and associated unacceptable performance uncertainties due to scaling are eliminated. The modular approach with multiple towers also improves plant availability. Heliostat field components, receivers and towers are shop assembled allowing for high quality and minimal field assembly. A centralized thermal-storage system stores hot salt from the receivers, allowing nearly continuous power production, independent of solar energy collection, and improved parity with the grid. A molten salt steam generator converts the stored thermal energy into steam, which powers a steam turbine generator to produce electricity. This paper describes the conceptual design of the plant, the advantages of modularity, expected performance, pathways to cost reductions, and environmental impact.

  10. 2010 Towers Watson. All rights reserved. What have you got in mind?

    E-Print Network [OSTI]

    Baia, Margarida

    and Towers Watson client use only. What do actuaries do? As well as communicating complex financial issues in an understandable way, actuaries: Apply their statistical, economic and mathematical expertise and knowledge · Chile · Colombia · Mexico · Uruguay NORTH AMERICA · Bermuda · Canada · United States Our 14

  11. August 30-31, 2005 Augusta Towers Hotel and Convention Center

    E-Print Network [OSTI]

    August 30-31, 2005 Augusta Towers Hotel and Convention Center Augusta, GA Sponsored by U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Hydrogen, Fuel Cells, more than 45 researchers and industry experts representing industrial gas and energy companies

  12. Ilchmann, Achim; Pahl, M. : Adaptive Multivariable pH Regulation of a Biogas Tower Reactor

    E-Print Network [OSTI]

    Knobloch,Jürgen

    Ilchmann, Achim; Pahl, M. : Adaptive Multivariable pH Regulation of a Biogas Tower Reactor Zuerst for a biogastower reactor.The reactor is a new type for anaerobic treatment of waste water. It has been developed. There are uunterollsapplicationsof control theory resr-rltsto single-inpr-rtsingle-outputpH control of stirred tarrk reactors: see

  13. ECON 162B -A0, A1 Kenny Christianson Fall 2010 office: Library Tower 1013

    E-Print Network [OSTI]

    Suzuki, Masatsugu

    ECON 162B - A0, A1 Kenny Christianson Fall 2010 office: Library Tower 1013 lecture A0: MWF 9, the stock market, and the role of the Federal Reserve in changing interest rates; the potential for double-dip recession and the rate of growth of GDP; inflation and deflation; the national debt and growing budget

  14. Standard Work Specifications for Single-Family Home Energy Upgrades Summary (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-11-01T23:59:59.000Z

    The U.S. Department of Energy (DOE), the National Renewable Energy Laboratory (NREL) and numerous industry stakeholders developed the Standard Work Specifications for Single-Family Home Energy Upgrades to define the minimum requirements for high-quality residential energy upgrades. Today, the Standard Work Specifications provide a unique source for defining high-quality home energy upgrades, establishing clear expectations for homeowners, contractors, trainers, workers, program administrators, and organizations that provide financing for energy upgrades.

  15. Energy Upgrade California in Los Angeles County, Loan Loss Reserve Fund Agreement

    Broader source: Energy.gov [DOE]

    Energy Upgrade California in Los Angeles County, Loan Loss Reserve Fund Agreement. Example of loan loss reserve agreement.

  16. A STUDY ON LEGIONELLA PNEUMOPHILA, WATER CHEMISTRY, AND ATMOSPHERIC CONDITIONS IN COOLING TOWERS AT THE SAVANNAH RIVER SITE

    SciTech Connect (OSTI)

    Smith, C.; Brigmon, R.

    2009-10-20T23:59:59.000Z

    Legionnaires disease is a pneumonia caused by the inhalation of the bacterium Legionella pneumophila. The majority of illnesses have been associated with cooling towers since these devices can harbor and disseminate the bacterium in the aerosolized mist generated by these systems. Historically, Savannah River Site (SRS) cooling towers have had occurrences of elevated levels of Legionella in all seasons of the year and in patterns that are difficult to predict. Since elevated Legionella in cooling tower water are a potential health concern a question has been raised as to the best control methodology. In this work we analyze available chemical, biological, and atmospheric data to determine the best method or key parameter for control. The SRS 4Q Industrial Hygiene Manual, 4Q-1203, 1 - G Cooling Tower Operation and the SRNL Legionella Sampling Program, states that 'Participation in the SRNL Legionella Sampling Program is MANDATORY for all operating cooling towers'. The resulting reports include L. pneumophila concentration information in cells/L. L. pneumophila concentrations >10{sup 7} cells/L are considered elevated and unsafe so action must be taken to reduce these densities. These remedial actions typically include increase biocide addition or 'shocking'. Sometimes additional actions are required if the problem persists including increase tower maintenance (e.g. cleaning). Evaluation of 14 SRS cooling towers, seven water quality parameters, and five Legionella serogroups over a three-plus year time frame demonstrated that cooling tower water Legionella densities varied widely though out this time period. In fact there was no one common consistent significant variable across all towers. The significant factors that did show up most frequently were related to suspended particulates, conductivity, pH, and dissolved oxygen, not chlorine or bromine as might be expected. Analyses of atmospheric data showed that there were more frequent significant elevated Legionella concentrations when the dew point temperature was high--a summertime occurrence. However, analysis of the three years of Legionella monitoring data of the 14 different SRS Cooling Towers demonstrated that elevated concentrations are observed at all temperatures and seasons. The objective of this study is to evaluate the ecology of L. pneumophila including serogroups and population densities, chemical, and atmospheric data, on cooling towers at SRS to determine whether relationships exist among water chemistry, and atmospheric conditions. The goal is to more fully understand the conditions which inhibit or encourage L. pneumophila growth and supply this data and associated recommendations to SRS Cooling Tower personnel for improved management of operation. Hopefully this information could then be used to help control L. pneumophila growth more effectively in SRS cooling tower water.

  17. CFD MODELING AND ANALYSIS FOR A-AREA AND H-AREA COOLING TOWERS

    SciTech Connect (OSTI)

    Lee, S.; Garrett, A.; Bollinger, J.

    2009-09-02T23:59:59.000Z

    Mechanical draft cooling towers are designed to cool process water via sensible and latent heat transfer to air. Heat and mass transfer take place simultaneously. Heat is transferred as sensible heat due to the temperature difference between liquid and gas phases, and as the latent heat of the water as it evaporates. Mass of water vapor is transferred due to the difference between the vapor pressure at the air-liquid interface and the partial pressure of water vapor in the bulk of the air. Equations to govern these phenomena are discussed here. The governing equations are solved by taking a computational fluid dynamics (CFD) approach. The purpose of the work is to develop a three-dimensional CFD model to evaluate the flow patterns inside the cooling tower cell driven by cooling fan and wind, considering the cooling fans to be on or off. Two types of the cooling towers are considered here. One is cross-flow type cooling tower located in A-Area, and the other is counterflow type cooling tower located in H-Area. The cooling tower located in A-Area is mechanical draft cooling tower (MDCT) consisting of four compartment cells as shown in Fig. 1. It is 13.7m wide, 36.8m long, and 9.4m high. Each cell has its own cooling fan and shroud without any flow communications between two adjacent cells. There are water distribution decks on both sides of the fan shroud. The deck floor has an array of about 25mm size holes through which water droplet falls into the cell region cooled by the ambient air driven by fan and wind, and it is eventually collected in basin area. As shown in Fig. 1, about 0.15-m thick drift eliminator allows ambient air to be humidified through the evaporative cooling process without entrainment of water droplets into the shroud exit. The H-Area cooling tower is about 7.3 m wide, 29.3 m long, and 9.0 m high. Each cell has its own cooling fan and shroud, but each of two corner cells has two panels to shield wind at the bottom of the cells. There is some degree of flow communications between adjacent cells through the 9-in gap at the bottom of the tower cells as shown in Fig. 2. Detailed geometrical dimensions for the H-Area tower configurations are presented in the figure. The model was benchmarked and verified against off-site and on-site test results. The verified model was applied to the investigation of cooling fan and wind effects on water cooling in cells when fans are off and on. This report will discuss the modeling and test results.

  18. ASDEX-UPGRADE TOKAMAK EMULATOR FOR TEST OF CONTROL SYSTEM AND SHOT PROGRAMME

    E-Print Network [OSTI]

    Zachmann, Gabriel

    ASDEX-UPGRADE TOKAMAK EMULATOR FOR TEST OF CONTROL SYSTEM AND SHOT PROGRAMME H. Richter, R.H. Cole the the most important internal states of the control software ASDEX-Upgrade tokamak device for controlled systems. I. INTRODUCTION ASDEX-Upgrade is an experimental plasma physical device of the tokamak type

  19. RHIC Operation and Plans for Upgrades Wolfram Fischer

    E-Print Network [OSTI]

    Ã? design 10Ã? achieved #12;Wolfram Fischer 7 Achieved parameters Mode No of bunches Ions/bunch [ 1 0 9] enhanced luminosity 60e9 Au intensity design luminosity Beamexperiments #12;Wolfram Fischer 10 RHIC Run-41 RHIC Operation and Plans for Upgrades Wolfram Fischer C-AD Machine Advisory Committee Meeting 10

  20. Progress in MPC and A upgrades at Luch

    SciTech Connect (OSTI)

    Mizin, P.; Chukov, V.; Rogatchev, V. [Gosudarstvennyj Nauchno-Issledovatel`skij Inst. NPO Luch, Podol`sk (Russian Federation); Curtiss, J. [Brookhaven National Lab., Upton, NY (United States); Erkkila, B. [Los Alamos National Lab., NM (United States); Goodey, K. [Pacific Northwest National Lab., Richland, WA (United States); Hembree, D. Jr. [Oak Ridge National Lab., TN (United States); Lowe, D. [Sandia National Labs., Albuquerque, NM (United States); Turner, C. [Lawrence Livermore National Lab., CA (United States)

    1997-09-01T23:59:59.000Z

    Luch, a MINATOM facility, has been engaged in both scientific research and uranium processing for fifty years. Since the spring of 1996, Luch has participated in a program of US/Russia Cooperation in Nuclear MPC and A Upgrades. The program began with planning for immediate upgrades in MPC and A, with en emphasis on physical protection. In addition, US and Luch experts exchanged technical data during a number of workshops, to establish a common understanding of available MPC and A tools and equipment. Site characterizations and vulnerability assessments were then prepared by Luch, to form the basis for the current program of methodical upgrades in all areas of MPC and A. Access control, alarms and alarm communications are being improved as part of this program. Control of nuclear material is being enhanced through improvements in material monitoring and in transportation security when nuclear material is moved between buildings on the Luch site. A comprehensive, site-wide computer network for Luch was designed during a recent workshop. Acquiring and installing this computer system, complete with COREMAS software, is currently in progress. Nuclear material analysis will be improved through NDA techniques using Canberra InSpector systems. The planned upgrades in nuclear MPC and A will reinforce safeguards over large quantities of HEU at Luch.

  1. Simulation of the TREAT-Upgrade Automatic Reactor Control System

    SciTech Connect (OSTI)

    Lipinski, W.C.; Kirsch, L.W.; Valente, A.D.

    1984-01-01T23:59:59.000Z

    This paper describes the design of the Automatic Reactor Control System (ARCS) for the Transient Reactor Test Facility (TREAT) Upgrade. A simulation was used to facilitate the ARCS design and to completely test and verify its operation before installation at the TREAT facility.

  2. Upgrade LCDs or TVs with improved ergonomic adjustability

    E-Print Network [OSTI]

    Saskatchewan, University of

    Highlights · Upgrade LCDs or TVs with improved ergonomic adjustability · Constant Force (CFTM) patented lift-and-pivot motion technology produces smooth adjustment · Neo-Flex LCD Stand is the only range of movement to your LCD display or TV with the Neo-Flex LCD Stand! This proven technology is now

  3. Installing or Upgrading to the SQL Server 2008

    E-Print Network [OSTI]

    Bernstein, Phil

    CHAPTER 1 Installing or Upgrading to the SQL Server 2008 Database Engine SQL Server 2008 Database Engine Services, formerly referred to as "The Database Engine," is the nucleus of SQL Server 2008. Its that command the use of a feature like SQL Server's Database Engine that can process, store, and secure data

  4. Recent Upgrade of the Klystron Modulator at SLAC

    SciTech Connect (OSTI)

    Nguyen, M.N.; Burkhart, C.P.; Lam, B.K.; Morris, B.; /SLAC

    2011-11-04T23:59:59.000Z

    The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 {mu}S at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 {mu}S at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

  5. COUNTY OF SAN DIEGO Energy Upgrade San Diego

    E-Print Network [OSTI]

    homeowners with initiatives; multifamily energy audit program; extended HERS II audit, field verification a multi-family energy audit program, and will extend HERS II audit and field verification and diagnosticCOUNTY OF SAN DIEGO Energy Upgrade San Diego Summary Sheet ARRA EECBG Discretionary Funding

  6. Post Production Heavy Oil Operations: A Case for Partial Upgrading

    E-Print Network [OSTI]

    Lokhandwala, Taher

    2012-12-05T23:59:59.000Z

    tipping off point and with a detailed look at the chemistry of the oil in question it is possible to make a very viable case for visbreaking. In a similar vein, this analysis can serve as a guide in making a case for other partial upgrading methods as well....

  7. CDF Run IIb Silicon Vertex Detector DAQ Upgrade

    SciTech Connect (OSTI)

    S. Behari et al.

    2003-12-18T23:59:59.000Z

    The CDF particle detector operates in the beamline of the Tevatron proton-antiproton collider at Fermilab, Batavia, IL. The Tevatron is expected to undergo luminosity upgrades (Run IIb) in the future, resulting in a higher number of interactions per beam crossing. To operate in this dense radiation environment, an upgrade of CDF's silicon vertex detector (SVX) subsystem and a corresponding upgrade of its VME-based DAQ system has been explored. Prototypes of all the Run IIb SVX DAQ components have been constructed, assembled into a test stand and operated successfully using an adapted version of CDF's network-capable DAQ software. In addition, a PCI-based DAQ system has been developed as a fast and inexpensive tool for silicon detector and DAQ component testing in the production phase. In this paper they present an overview of the Run IIb silicon DAQ upgrade, emphasizing the new features and improvements incorporated into the constituent VME boards, and discuss a PCI-based DAQ system developed to facilitate production tests.

  8. Investment and Upgrade in Distributed Generation under Uncertainty

    E-Print Network [OSTI]

    Guillas, Serge

    decision as the opportunity cost of exercising the investment option increases as well. In this paper, weInvestment and Upgrade in Distributed Generation under Uncertainty Afzal Siddiqui Karl Maribu 13 for microgrids to use small-scale distributed generation (DG) and combined heat and power (CHP) applications via

  9. Technologies for Upgrading Light Water Reactor Outlet Temperature

    SciTech Connect (OSTI)

    Daniel S. Wendt; Piyush Sabharwall; Vivek Utgikar

    2013-07-01T23:59:59.000Z

    Nuclear energy could potentially be utilized in hybrid energy systems to produce synthetic fuels and feedstocks from indigenous carbon sources such as coal and biomass. First generation nuclear hybrid energy system (NHES) technology will most likely be based on conventional light water reactors (LWRs). However, these LWRs provide thermal energy at temperatures of approximately 300°C, while the desired temperatures for many chemical processes are much higher. In order to realize the benefits of nuclear hybrid energy systems with the current LWR reactor fleets, selection and development of a complimentary temperature upgrading technology is necessary. This paper provides an initial assessment of technologies that may be well suited toward LWR outlet temperature upgrading for powering elevated temperature industrial and chemical processes during periods of off-peak power demand. Chemical heat transformers (CHTs) are a technology with the potential to meet LWR temperature upgrading requirements for NHESs. CHTs utilize chemical heat of reaction to change the temperature at which selected heat sources supply or consume thermal energy. CHTs could directly utilize LWR heat output without intermediate mechanical or electrical power conversion operations and the associated thermodynamic losses. CHT thermal characteristics are determined by selection of the chemical working pair and operating conditions. This paper discusses the chemical working pairs applicable to LWR outlet temperature upgrading and the CHT operating conditions required for providing process heat in NHES applications.

  10. Upgrading the ampacity of HPFF pipe-type cable circuits

    SciTech Connect (OSTI)

    Aabo, T.; Lawson, W.G. [Power Technologies, Inc., Schenectady, NY (United States)] [Power Technologies, Inc., Schenectady, NY (United States); Pancholi, S.V. [Potomac Electric Power Co., Washington, DC (United States)] [Potomac Electric Power Co., Washington, DC (United States)

    1995-01-01T23:59:59.000Z

    The upgrading of several 69 kV pipe-type cable feeders on the Potomac Electric Power Company (PEPCO) ion cable system is The methods used for the ampacity calculation are described. The fluid circulation approach required to meet the feeder emergency load requirements are For the feeders that were in service for approximately 40 years, a system life evaluation was performed.

  11. T Plant secondary containment and leak detection upgrades

    SciTech Connect (OSTI)

    Carlson, T.A.

    1995-10-19T23:59:59.000Z

    The W-259 project will provide upgrades to the 2706-T/TA Facility to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. The project provides decontamination activities supporting the environmental restoration mission and waste management operations on the Hanford Site.

  12. South Ukraine NPP: Safety improvements through Plant Computer upgrade

    SciTech Connect (OSTI)

    Brenman, O. [Westinghouse Electric Company, 4350 Northern Pike, Monroeville, PA 15146 (United States); Chernyshov, M. A. [Westron, LLC, 1 Acad. Proskura St., Kharkiv 61070 (Ukraine); Denning, R. S. [Battelle, 505 King Ave, Columbus, OH 43201 (United States); Kolesov, S. A. [NAEK Energoatom, 3 Vetrov Str., Kiev, 01032 (Ukraine); Balakan, H. H.; Bilyk, B. I.; Kuznetsov, V. I. [PO South Ukraine NPP, NAEK Energoatom, Mylolayv Region, 55000 (Ukraine); Trosman, G. [US Dept. of Energy, International Nuclear Safety Program, Washington, DC 20585 (United States)

    2006-07-01T23:59:59.000Z

    This paper summarizes some results of the Plant Computer upgrade at the Units 2 and 3 of South Ukraine Nuclear Power Plant (NPP). A Plant Computer, which is also called the Computer Information System (CIS), is one of the key safety-related systems at VVER-1000 nuclear plants. The main function of the CIS is information support for the plant operators during normal and emergency operational modes. Before this upgrade, South Ukraine NPP operated out-of-date and obsolete systems. This upgrade project wax founded by the U.S. DOE in the framework of the International Nuclear Safety Program (INSP). The most efficient way to improve the quality and reliability of information provided to the plant operator is to upgrade the Human-System Interface (HSI), which is the Upper Level (UL) CIS. The upgrade of the CIS data-acquisition system (DAS), which is the Lower Level (LL) CIS, would have less effect on the unit safety. Generally speaking, the lifetime of the LL CIS is much higher than one of the UL CIS. Unlike Plant Computers at the Western-designed plants, the functionality of the WER-1000 CISs includes a control function (Centralized Protection Testing) and a number of the plant equipment monitoring functions, for example, Protection and Interlock Monitoring and Turbo-Generator Temperature Monitoring. The new system is consistent with a historical migration of the format by which information is presented to the operator away from the traditional graphic displays, for example, Piping and Instrument Diagrams (P and ID's), toward Integral Data displays. The cognitive approach to information presentation is currently limited by some licensing issues, but is adapted to a greater degree with each new system. The paper provides some lessons learned on the management of the international team. (authors)

  13. Low rank coal upgrading in a flow of hot water

    SciTech Connect (OSTI)

    Masato Morimoto; Hiroyuki Nakagawa; Kouichi Miura [Kyoto University, Kyoto (Japan). Department of Chemical Engineering

    2009-09-15T23:59:59.000Z

    Simultaneous hydrothermal degradation and extraction at around 350{sup o}C using flowing solvent as a reaction/extraction medium were proposed for upgrading brown coal, more specifically, for converting brown coal into several fractions having different molecular weight and chemical structure under mild conditions. When an Australian brown coal, Loy Yang coal, was treated by water at 350{sup o}C under 18 MPa, the coal was separated into four fractions: gaseous product by 8% yield, water-soluble extract at room temperature (soluble) by 23% yield, extract precipitates as solid at room temperature (deposit) by 23% yield, and residual coal (upgraded coal) by 46% yield on daf basis. The separation was found to be realized by in situ extraction of low-molecular-weight substances released from coal macromolecular structure and/or those generated by hydrothermal decomposition reactions at 350{sup o}C. The solid products obtained, deposit and upgraded coal, were characterized in detail to examine the possibility of their effective utilization as solid fuel and chemical feed stock. The upgraded coal showed higher heating value and higher gasification reactivity than the parent coal, indicating that the upgraded coal can be a better solid fuel than the parent coal. The solid extract, deposit, was found to show thermoplasticity at less than 200{sup o}C, suggesting the possibility of utilizing the deposit as a raw material of high performance carbon materials. Several variables affecting the performance of the proposed method are also examined in detail in this paper. 12 refs., 8 figs., 3 tabs.

  14. Upgraded coal interest group. Quarterly report, July 1, 1995--September 30, 1995

    SciTech Connect (OSTI)

    Weber, W. [Electric Power Research Inst., Chattanooga, TN (United States); Lebowitz, H.E. [Fossil Fuel Sciences, Palo Alto, CA (United States)

    1995-12-31T23:59:59.000Z

    The objectives of the Upgraded Coal Interest Group (UCIG) are as follows: Review and update the status of various coal upgrading technologies and developments and critically assess the results. Perform engineering screening analyses on various coal upgrading approaches. Perform commercialization analyses that will promote the availability and use of upgraded coal products by quantifying the benefits of using them. Identify market opportunities for introduction of upgraded coals. Perform critical analyses on a variety of coals and technologies in areas important to users but not readily available. Perform critical experiments which will show the differences between technologies.

  15. Upgrade of CEBAF from 6-GeV To 12-GeV: Status

    SciTech Connect (OSTI)

    Harwood, Leigh H.

    2013-04-01T23:59:59.000Z

    The CEBAF accelerator is being upgraded from 6 GeV to 12 GeV by the US Department of Energy. The accelerator upgrade is being done within the existing tunnel footprint. The accelerator upgrade includes: 10 new srfbased high-performance cryomodules plus RF systems, doubling the 2K helium plants capability, upgrading the existing beamlines to operate at nearly double the original performance envelope, and adding a beamline to a new experimental area. Construction is over 75% complete with final completion projected for late FY13. Details of the upgrade and status of the work will be presented.

  16. THE RELATIVISTIC HEAVY ION COLLIDER (RHIC) REFRIGERATOR SYSTEM AT BROOKHAVEN NATIONAL LABORATORY: PHASE III OF THE SYSTEM PERFORMANCE AND OPERATIONS UPGRADES FOR 2003

    SciTech Connect (OSTI)

    SIDI-YEKHLEF,A.; TUOZZOLO,J.; THAN, R.; KNUDSEN, P.; ARENIUS, D.

    2005-08-29T23:59:59.000Z

    An ongoing program at Brookhaven National Laboratory (BNL) consists of improving the efficiency of the Relativistic Heavy Ion Collider (RHIC) cryogenic system and reducing its power consumption. Phase I and I1 of the program addressed plant operational improvements and modifications that resulted in substantial operational cost reduction and improved system reliability and stability, and a compressor input power reduction of 2 MW has been demonstrated. Phase 111, now under way, consists of plans for further increasing the efficiency of the plant by adding a load ''wet'' turbo-expander and its associated heat exchangers at the low temperature end of the plant. This additional stage of cooling at the coldest level will further reduce the required compressor flow and therefore compressor power input. This paper presents the results of the plant characterization, as it is operating presently, as well as the results of the plant simulations of the various planned upgrades for, the plant. The immediate upgrade includes the changes associated with the load expander. The subsequent upgrade will involve the resizing of expander 5 and 6 to increase their efficiencies. The paper summarizes the expected improvement in the plant efficiency and the overall reduction in the compressor power.

  17. The Relativistic Heavy Ion Collider (RHIC) Refrigerator System at Brookhaven National Laboratory: Phase III of the System Performance and Operations Upgrades for 2006

    SciTech Connect (OSTI)

    A. Sidi-Yekhlef; R. Than; J. Tuozzolo; V. Ganni; P. Knudsen; D. Arenius

    2006-05-01T23:59:59.000Z

    An ongoing program at Brookhaven National Laboratory (BNL) consists of improving the efficiency of the Relativistic Heavy Ion Collider (RHIC) cryogenic system and reducing its power consumption. Phase I and II of the program addressed plant operational improvements and modifications that resulted in substantial operational cost reduction and improved system reliability and stability, and a compressor input power reduction of 2 MW has been demonstrated. Phase III, now under way, consists of plans for further increasing the efficiency of the plant by adding a load ''wet'' turbo-expander and its associated heat exchangers at the low temperature end of the plant. This additional stage of cooling at the coldest level will further reduce the required compressor flow and therefore compressor power input. This paper presents the results of the plant characterization, as it is operating presently, as well as the results of the plant simulations of the various planned upgrades for the plant. The immediate upgrade includes the changes associated with the load expander. The subsequent upgrade will involve the resizing of expander 5 and 6 to increase their efficiencies. The paper summarizes the expected improvement in the plant efficiency and the overall reduction in the compressor power.

  18. Maximum-likelihood density modification

    SciTech Connect (OSTI)

    Terwilliger, Thomas C., E-mail: terwilliger@lanl.gov [Structural Biology Group, Mail Stop M888, Los Alamos National Laboratory, Los Alamos, NM 87545 (United States)

    2000-08-01T23:59:59.000Z

    A likelihood-based density modification approach is developed that can incorporate expected electron-density information from a wide variety of sources. A likelihood-based approach to density modification is developed that can be applied to a wide variety of cases where some information about the electron density at various points in the unit cell is available. The key to the approach consists of developing likelihood functions that represent the probability that a particular value of electron density is consistent with prior expectations for the electron density at that point in the unit cell. These likelihood functions are then combined with likelihood functions based on experimental observations and with others containing any prior knowledge about structure factors to form a combined likelihood function for each structure factor. A simple and general approach to maximizing the combined likelihood function is developed. It is found that this likelihood-based approach yields greater phase improvement in model and real test cases than either conventional solvent flattening and histogram matching or a recent reciprocal-space solvent-flattening procedure [Terwilliger (1999 ?), Acta Cryst. D55, 1863–1871].

  19. Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption

    SciTech Connect (OSTI)

    Anna Lee Tonkovich

    2004-07-01T23:59:59.000Z

    The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the technical feasibility and cost of upgrading low-BTU methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys modular microchannel process technology. The objective of Phase II is to demonstrate the process at the bench scale. The project is on schedule and on budget. A technical and economic feasibility assessment was completed in Task 3. The proposed Velocys technology appears feasible for the methane upgrading market. Evaluated categories include adsorbent selection, rapid-cycle valve selection, microchannel manufacturability assessment, and system design and cost. The selected adsorbent, granular microporous carbon from either Barnaby-Sutcliffe or Calgon, experimentally demonstrated sufficient methane capacity under differential temperature at 100 pounds per square inch gauge. Several valve options were identified, including candidates that can operate millions of cycles between refurbishment. The microchannel adsorber and desorber designs were made using internal Velocys manufacturability standards, and the associated costs are acceptable as included with the complete nitrogen rejection unit (NRU) cost projection. A system design and cost estimate was completed for the NRU section of the methane upgrading system. As integrated into the complete system, the cost is in line with the market requirement. The system has six main unit operations: feed compressor, dehydration unit, nitrogen rejection unit, deoxygenator, carbon dioxide scrubber, and a sales compressor. The NRU is the focus of the development program, and a bench-scale demonstration will be initiated in the next fiscal year. The Velocys NRU system targets producing methane with greater than 96% purity and at least 90% recovery for final commercial operation. A preliminary cost analysis of the methane upgrading system, including the Velocys NRU, suggests that costs below $2.00 per million (MM) BTU methane may be achieved. The cost for a conventional methane upgrading system is well above $2.30 per MM BTU, as benchmarked in an Environmental Protection Agency study.

  20. Evidence of a Threshold Wind Speed in Tower-mounted Scatterometer Data David W. Draper and David G. Long

    E-Print Network [OSTI]

    Long, David G.

    . Evidence of the threshold wind speed and a hysteresis effect have been observed in airship and wave tank in airship data [2]. YSCAT, an ultra-wideband (2-14 GHz) tower-mounted scat- terometer, provides significant

  1. Effects of adding wash tower effluent to Ano Liossia landfill to enhance bioreaction c by Olympia Galenianou.

    E-Print Network [OSTI]

    Galenianou, Olympia

    2006-01-01T23:59:59.000Z

    A theoretical study was performed on the effects of adding sulfate-rich wash tower effluent from the Athens hospital waste incinerator to the Ano Liossia landfill of Athens. The method of mass balance was used to examine ...

  2. Energy Savings Accomplished by Replacing Steam Ejectors with Electric Driven Vacuum Pumps in Crude Distillation Vacuum Towers

    E-Print Network [OSTI]

    Nelson, R. E.

    1982-01-01T23:59:59.000Z

    The low cost of steam combined with the maintenance free operation of steam ejectors has assured their unquestioned use in providing the necessary vacuum for crude distillation vacuum towers. However, the cost of steam production has risen...

  3. Waste minimization by process modification

    SciTech Connect (OSTI)

    Hopper, J.R.; Yaws, C.L.; Ho, T.C.; Vichailak, M. (Lamar Univ., Beaumont, TX (United States))

    1993-01-01T23:59:59.000Z

    A simulation of the Sohio process for the production of acrylonitrile from the catalytic ammoxidation of propylene has been performed, using published kinetic and thermodynamic data to illustrate the concepts of pollution prevention by process modification. The study has determined the reaction parameters which will minimize the production of by-products while maintaining the conversion of propylene above 80%. The reaction parameters studied were reactor type (plug flow reactor [PFR], continuous stirred tank reactor [CSTR], and fluidized bed reactor [FBC]), reaction temperature, residence time, and entering feed temperature. The minimum by-products were produced in an FBR operating at 450 C at a residence time of 7 seconds for a conversion of 81%.

  4. Upgrade of 400,000 gallon water storage tank at Argonne National Laboratory-West to UCRL-15910 high hazard seismic requirements

    SciTech Connect (OSTI)

    Griffin, M.J. [EQE International, Inc., Irvine, CA (United States); Harris, B.G. [Argonne National Lab., Idaho Falls, ID (United States)

    1993-10-01T23:59:59.000Z

    As part of the Integral Fast Reactor (IFR) Project at Argonne National Laboratory West (ANL-W), it was necessary to strengthen an existing 400,000 gallon flat-bottom water storage tank to meet UCRL-15910 (currently formulated as DOE Standard DOE-STD-1020-92, Draft) high hazard natural phenomena requirements. The tank was constructed in 1988 and preliminary calculations indicated that the existing base anchorage was insufficient to prevent buckling and potential failure during a high hazard seismic event. General design criteria, including ground motion input, load combinations, etc., were based upon the requirements of UCRL-15910 for high hazard facilities. The analysis and capacity assessment criteria were based on the Generic Implementation Procedure developed by the Seismic Qualification Utilities Group (SQUG). Upgrade modifications, consisting of increasing the size of the Generic Implementation Procedure developed by the Seismic Qualification Utilities Group (SQUG). Upgrade modifications, consisting of increasing the size of the foundation and installing additional anchor bolts and chairs, were necessary to increase the capacity of the tank anchorage/support system. The construction of the upgrades took place in 1992 while the tank remained in service to allow continued operation of the EBR-II reactor. The major phases of construction included the installation and testing of 144 1/14in. {times} 15in., and 366 1in. {times} 16in. epoxied concrete anchors, placement of 220 cubic yards of concrete heavily reinforced, and installation of 24 1-1/2in. {times} 60in. tank anchor bolts and chairs. A follow-up inspection of the tank interior by a diver was conducted to determine if the interior tank coating had been damaged by the chair welding. The project was completed on schedule and within budget.

  5. Reliability Analysis of Cooling Towers: Influence of Rebars Corrosion on Failure

    SciTech Connect (OSTI)

    Sudret, Bruno [Electricite de France - EDF, Research and Development Division, Dpt of Materials and Mechanics of Components, Site des Renardieres, 77818 Moret-sur-Loing Cedex (France); Pendola, Maurice [PHI-MECA Engineering, 1 Allee Alan Turing, 63170 - Aubiere (France)

    2002-07-01T23:59:59.000Z

    Natural-draught cooling towers are used in nuclear power plants as heat exchangers. These structures are submitted to environmental loads such as wind and thermal gradients that are stochastic in nature. A probabilistic framework has been developed by EDF (Electricite de France) for assessing the durability of such structures. In this paper, the corrosion of the rebars due to concrete carbonation and the corresponding weakening of the reinforced concrete sections is considered. Due to the presence of time in the definition of the limit state function associated with the loss of serviceability of the cooling tower, time-variant reliability analysis has to be used. A novel approach is proposed to take into account the random 'initiation time', which corresponds to the time necessary for the carbonation to attain the rebars. Results are given in terms of the probability of failure of the structure over its life time. (authors)

  6. Current and Future Costs for Parabolic Trough and Power Tower Systems in the US Market: Preprint

    SciTech Connect (OSTI)

    Turchi, C.; Mehos, M.; Ho, C. K.; Kolb, G. J.

    2010-10-01T23:59:59.000Z

    NREL's Solar Advisor Model (SAM) is employed to estimate the current and future costs for parabolic trough and molten salt power towers in the US market. Future troughs are assumed to achieve higher field temperatures via the successful deployment of low melting-point, molten-salt heat transfer fluids by 2015-2020. Similarly, it is assumed that molten salt power towers are successfully deployed at 100MW scale over the same time period, increasing to 200MW by 2025. The levelized cost of electricity for both technologies is predicted to drop below 11 cents/kWh (assuming a 10% investment tax credit and other financial inputs outlined in the paper), making the technologies competitive in the marketplace as benchmarked by the California MPR. Both technologies can be deployed with large amounts of thermal energy storage, yielding capacity factors as high as 65% while maintaining an optimum LCOE.

  7. Design considerations for concentrating solar power tower systems employing molten salt.

    SciTech Connect (OSTI)

    Moore, Robert Charles; Siegel, Nathan Phillip; Kolb, Gregory J.; Vernon, Milton E.; Ho, Clifford Kuofei

    2010-09-01T23:59:59.000Z

    The Solar Two Project was a United States Department of Energy sponsored project operated from 1996 to 1999 to demonstrate the coupling of a solar power tower with a molten nitrate salt as a heat transfer media and for thermal storage. Over all, the Solar Two Project was very successful; however many operational challenges were encountered. In this work, the major problems encountered in operation of the Solar Two facility were evaluated and alternative technologies identified for use in a future solar power tower operating with a steam Rankine power cycle. Many of the major problems encountered can be addressed with new technologies that were not available a decade ago. These new technologies include better thermal insulation, analytical equipment, pumps and values specifically designed for molten nitrate salts, and gaskets resistant to thermal cycling and advanced equipment designs.

  8. Upgrading the Radioactive Waste Management Infrastructure in Azerbaijan

    SciTech Connect (OSTI)

    Huseynov, A. [Baku Radioactive Waste Site IZOTOP, Baku (Azerbaijan); Batyukhnova, O. [State Unitary Enterprise Scientific and Industrial Association Radon, Moscow (Russian Federation); Ojovan, M. [Sheffield Univ., Immobilisation Science Lab. (United Kingdom); Rowat, J. [International Atomic Energy Agency, Dept. of Nuclear Safety and Security, Vienna (Austria)

    2007-07-01T23:59:59.000Z

    Radionuclide uses in Azerbaijan are limited to peaceful applications in the industry, medicine, agriculture and research. The Baku Radioactive Waste Site (BRWS) 'IZOTOP' is the State agency for radioactive waste management and radioactive materials transport. The radioactive waste processing, storage and disposal facility is operated by IZOTOP since 1963 being significantly upgraded from 1998 to be brought into line with international requirements. The BRWS 'IZOTOP' is currently equipped with state-of-art devices and equipment contributing to the upgrade the radioactive waste management infrastructure in Azerbaijan in line with current internationally accepted practices. The IAEA supports Azerbaijan specialists in preparing syllabus and methodological materials for the Training Centre that is currently being organized on the base of the Azerbaijan BRWS 'IZOTOPE' for education of specialists in the area of safety management of radioactive waste: collection, sorting, processing, conditioning, storage and transportation. (authors)

  9. Detector and System Developments for LHC Detector Upgrades

    E-Print Network [OSTI]

    Mandelli, Beatrice; Guida, Roberto; Rohne, Ole; Stapnes, Steinar

    2015-05-12T23:59:59.000Z

    The future Large Hadron Collider (LHC) Physics program and the consequent improvement of the LHC accelerator performance set important challenges to all detector systems. This PhD thesis delineates the studies and strategies adopted to improve two different types of detectors: the replacement of precision trackers with ever increasingly performing silicon detectors, and the improvement of large gaseous detector systems by optimizing their gas mixtures and operation modes. Within the LHC tracker upgrade programs, the ATLAS Insertable B-layer (IBL) is the first major upgrade of a silicon-pixel detector. Indeed the overall ATLAS Pixel Detector performance is expected to degrade with the increase of luminosity and the IBL will recover the performance by adding a fourth innermost layer. The IBL Detector makes use of new pixel and front-end electronics technologies as well as a novel thermal management approach and light support and service structures. These innovations required complex developments and Quality Ass...

  10. Jefferson Lab 12 GeV CEBAF Upgrade

    SciTech Connect (OSTI)

    Claus Rode

    2010-04-01T23:59:59.000Z

    The existing continuous electron beam accelerator facility (CEBAF) at Thomas Jefferson National Accelerator Facility (TJNAF) is a 5-pass, recirculating cw electron Linac operating at ~6 GeV and is devoted to basic research in nuclear physics. The 12 GeV CEBAF Upgrade is a $310 M project, sponsored by the Department of Energy (DOE) Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. The project received construction approval in September 2008 and has started the major procurement process. The cryogenic aspects of the 12 GeV CEBAF Upgrade includes: doubling the accelerating voltages of the Linacs by adding ten new high-performance, superconducting radiofrequency (SRF) cryomodules (CMs) to the existing 42 1/4 cryomodules; doubling of the 2 K cryogenics plant; and the addition of eight superconducting magnets.

  11. 2 MW upgrade of the Fermilab Main Injector

    SciTech Connect (OSTI)

    Weiren Chou

    2003-06-04T23:59:59.000Z

    In January 2002, the Fermilab Director initiated a design study for a high average power, modest energy proton facility. An intensity upgrade to Fermilab's 120-GeV Main Injector (MI) represents an attractive concept for such a facility, which would leverage existing beam lines and experimental areas and would greatly enhance physics opportunities at Fermilab and in the U.S. With a Proton Driver replacing the present Booster, the beam intensity of the MI is expected to be increased by a factor of five. Accompanied by a shorter cycle, the beam power would reach 2 MW. This would make the MI a more powerful machine than the SNS or the J-PARC. Moreover, the high beam energy (120 GeV) and tunable energy range (8-120 GeV) would make it a unique high power proton facility. The upgrade study has been completed and published. This paper gives a summary report.

  12. Using EPICS enabled industrial hardware for upgrading control systems

    SciTech Connect (OSTI)

    Bjorkland, Eric A [Los Alamos National Laboratory; Veeramani, Arun [NATIONAL INSTRUMENTS; Debelle, Thierry [NATIONAL INSTRUMENTS

    2009-01-01T23:59:59.000Z

    Los Alamos National Laboratory has been working with National Instruments (NI) and Cosy lab to implement EPICS Input Output Controller (IOC) software that runs directly on NI CompactRIO Real Time Controller (RTC) and communicates with NI LabVIEW through a shared memory interface. In this presentation, we will discuss our current progress in upgrading the control system at the Los Alamos Neutron Science Centre (LANSCE) and what we have learned about integrating CompactRIO into large experimental physics facilities. We will also discuss the implications of using Channel Access Server for LabVIEW which will enable more commercial hardware platforms to be used in upgrading existing facilities or in commissioning new ones.

  13. Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway

    SciTech Connect (OSTI)

    Davis, Ryan; Biddy, Mary J.; Jones, Susanne B.

    2013-03-31T23:59:59.000Z

    In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline, diesel and jet range hydrocarbon blendstocks.

  14. Molten Salt Power Tower Cost Model for the System Advisor Model (SAM)

    SciTech Connect (OSTI)

    Turchi, C. S.; Heath, G. A.

    2013-02-01T23:59:59.000Z

    This report describes a component-based cost model developed for molten-salt power tower solar power plants. The cost model was developed by the National Renewable Energy Laboratory (NREL), using data from several prior studies, including a contracted analysis from WorleyParsons Group, which is included herein as an Appendix. The WorleyParsons' analysis also estimated material composition and mass for the plant to facilitate a life cycle analysis of the molten salt power tower technology. Details of the life cycle assessment have been published elsewhere. The cost model provides a reference plant that interfaces with NREL's System Advisor Model or SAM. The reference plant assumes a nominal 100-MWe (net) power tower running with a nitrate salt heat transfer fluid (HTF). Thermal energy storage is provided by direct storage of the HTF in a two-tank system. The design assumes dry-cooling. The model includes a spreadsheet that interfaces with SAM via the Excel Exchange option in SAM. The spreadsheet allows users to estimate the costs of different-size plants and to take into account changes in commodity prices. This report and the accompanying Excel spreadsheet can be downloaded at https://sam.nrel.gov/cost.

  15. NREL National Wind Technology Center (NWTC): M2 Tower; Boulder, Colorado (Data)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Jager, D.; Andreas, A.

    The National Wind Technology Center (NWTC), located at the foot of the Rocky Mountains near Boulder, Colorado, is a world-class research facility managed by NREL for the U.S. Department of Energy. NWTC researchers work with members of the wind energy industry to advance wind power technologies that lower the cost of wind energy through research and development of state-of-the-art wind turbine designs. NREL's Measurement and Instrument Data Center provides data from NWTC's M2 tower which are derived from instruments mounted on or near an 82 meter (270 foot) meteorological tower located at the western edge of the NWTC site and about 11 km (7 miles) west of Broomfield, and approximately 8 km (5 miles) south of Boulder, Colorado. The data represent the mean value of readings taken every two seconds and averaged over one minute. The wind speed and direction are measured at six heights on the tower and air temperature is measured at three heights. The dew point temperature, relative humidity, barometric pressure, totalized liquid precipitation, and global solar radiation are also available.

  16. The Worlds First Ever Cooling Tower Acceptance Test Using Process Data Reconciliation

    SciTech Connect (OSTI)

    Magnus Langenstein; Jan Hansen-Schmidt [BTB-Jansky GmbH, Gerlingerstrasse 151, D-71229 Leonberg (Germany)

    2006-07-01T23:59:59.000Z

    The cooling capacity of cooling towers is influenced by multiple constructive and atmospheric parameters in a very complex way. This leads to strong variations of the measured cold-water temperature and causes unacceptable unreliability of conventional acceptance tests, which are based on single point measurements. In order to overcome this lack of accuracy a new approach to acceptance test based on process data reconciliation has been developed by BTB Jansky and applied at a nuclear power plant. This approach uses process data reconciliation according to VDI 2048 to evaluate datasets over a long period covering different operating conditions of the cooling tower. Data reconciliation is a statistical method to determine the true process parameters with a statistical probability of 95% by considering closed material-, mass-and energy balances. Datasets which are not suitable for the evaluation due to strong transient gradients are excluded beforehand, according to well-defined criteria. The reconciled cold-water temperature is then compared, within a wet bulb temperature range of 5 deg. C to 20 deg. C to the manufacturer's guaranteed temperature. Finally, if the average deviation between reconciled and guaranteed value over the evaluated period is below zero, the cooling tower guarantee is fulfilled. (authors)

  17. Stability and Turbulence in the Atmospheric Boundary Layer: A Comparison of Remote Sensing and Tower Observations

    SciTech Connect (OSTI)

    Friedrich, K.; Lundquist, J. K.; Aitken, M.; Kalina, E. A.; Marshall, R. F.

    2012-01-01T23:59:59.000Z

    When monitoring winds and atmospheric stability for wind energy applications, remote sensing instruments present some advantages to in-situ instrumentation such as larger vertical extent, in some cases easy installation and maintenance, measurements of vertical humidity profiles throughout the boundary layer, and no restrictions on prevailing wind directions. In this study, we compare remote sensing devices, Windcube lidar and microwave radiometer, to meteorological in-situ tower measurements to demonstrate the accuracy of these measurements and to assess the utility of the remote sensing instruments in overcoming tower limitations. We compare temperature and wind observations, as well as calculations of Brunt-Vaisala frequency and Richardson numbers for the instrument deployment period in May-June 2011 at the U.S. Department of Energy National Renewable Energy Laboratory's National Wind Technology Center near Boulder, Colorado. The study reveals that a lidar and radiometer measure wind and temperature with the same accuracy as tower instruments, while also providing advantages for monitoring stability and turbulence. We demonstrate that the atmospheric stability is determined more accurately when the liquid-water mixing ratio derived from the vertical humidity profile is considered under moist-adiabatic conditions.

  18. ALT-II armor tile design for upgraded TEXTOR operation

    SciTech Connect (OSTI)

    Newberry, B.L. [Univ. of Michigan, Ann Arbor, MI (United States); McGrath, R.T.; Watson, R.D. [Sandia National Labs., Albuquerque, NM (United States); Kohlhaas, W.; Finken, K.H. [Kernforschungsanlage Juelich GmbH (Germany). Inst. fuer Plasmaphysik; Noda, N. [National Inst. for Fusion Science, Nagoya (Japan)

    1994-08-01T23:59:59.000Z

    The upgrade of the TEXTOR tokamak at KFA Juelich was recently completed. This upgrade extended the TEXTOR pulse length from 5 seconds to 10 seconds. The auxiliary heating was increased to a total of 8.0 MW through a combination of neutral beam injection and radio frequency heating. Originally, the inertially cooled armor tiles of the full toroidal belt Advanced Limiter Test -- II (ALT-II) were designed for a 5-second operation with total heating of 6.0 MW. The upgrade of TEXTOR will increase the energy deposited per pulse onto the ALT-II by about 300%. Consequently, the graphite armor tiles for the ALT-II had to be redesigned to avoid excessively high graphite armor surface temperatures that would lead to unacceptable contamination of the plasma. This redesign took the form of two major changes in the ALT-II armor tile geometry. The first design change was an increase of the armor tile thermal mass, primarily by increasing the radial thickness of each tile from 17 mm to 20 mm. This increase in the radial tile dimension reduces the overall pumping efficiency of the ALT-II pump limiter by about 30%. The reduction in exhaust efficiency is unfortunate, but could be avoided only by active cooling of the ALT-II armor tiles. The active cooling option was too complicated and expensive to be considered at this time. The second design change involved redefining the plasma facing surface of each armor tile in order to fully utilize the entire surface area. The incident charged particle heat flux was distributed uniformly over the armor tile surfaces by carefully matching the radial, poloidal and toroidal curvature of each tile to the plasma flow in the TEXTOR boundary layer. This geometry redefinition complicates the manufacturing of the armor tiles, but results in significant thermal performance gains. In addition to these geometry upgrades, several material options were analyzed and evaluated.

  19. Slum upgrading in India and Kenya: investigating the sustainability

    E-Print Network [OSTI]

    Cronin, Victoria Louise Molly

    2012-04-10T23:59:59.000Z

    I – Government of India HUDCO – Housing and Urban Development Corporation Limited IoG – Institute of Governance JNNURM – Jawaharlal Nehru National Urban Renewal Mission KP – Kamgar Putla LDCs – Least Developed Countries MASHAL – Maharashtra Area Social... -up approaches. The case studies are of varying ages and were implemented via partnerships with differing agents including government, NGO, CBO, private developer and donors. The influence and design of the delivery model upon the upgrading sustainability...

  20. Plasma diagnostics for the DIII-D divertor upgrade

    SciTech Connect (OSTI)

    Hill, D.N.; Futch, A. (Lawrence Livermore National Lab., CA (USA)); Buchenauer, D. (Sandia National Labs., Livermore, CA (USA)); Doerner, R.; Lehmer, R.; Schmitz, L. (California Univ., Los Angeles, CA (USA)); Klepper, C.C.; Menon, M. (Oak Ridge National Lab., TN (USA)); Leikind, B.; Lippmann, S.; Mahdavi, M.A.; Schaffer, M.; Smith, J. (General Atomics, San Diego, CA (USA)); Salmonson, J.; Watkins, J. (San

    1990-10-01T23:59:59.000Z

    The DIII-D tokamak is being upgraded to allow for divertor biasing, baffling, and pumping experiments. This paper gives an overview of the new diagnostics added to DIII-D as part of this Advanced Divertor Program. They include tile current monitors, fast reciprocating Langmuir probes, a fixed probe array in the divertor, fast neutral pressure gauges, and H{sub {alpha}} measurements with TV cameras and fiber optics coupled to a high resolution spectrometer. 9 refs.

  1. CRYOGENIC FACITLITY DESIGN IN BEPC II SUPERCONDUCTING UPGRADE.

    SciTech Connect (OSTI)

    JIA,L.X.; WANG,L.; YANG,G.D.; ET AL.

    2004-05-11T23:59:59.000Z

    Three kinds of superconducting device are to be constructed at interaction regions in the upgrade of Beijing Electron-Positron Collider (BEPCII). Two sets of refrigerators with each capacity of 500W at 4.5K are adopted to provide the refrigeration for them. The cryogenic systems to support the operation of the superconducting facilities are under design by Harbin Institute of Technology in China. This paper presents the current design of main cryogenic facilities.

  2. Upgrading the ampacity of HPFF pipe-type cable circuits

    SciTech Connect (OSTI)

    Aabo, T.; Lawson, W.G. [Power Technologies, Inc., Schenectady, NY (United States); Pancholi, S.V. [Potomac Electric Power Co., Washington, DC (United States)

    1994-12-31T23:59:59.000Z

    The upgrading of several 69 kV pipe-type cable feeders on the Potomac Electric Power Company (PEPCo) transmission cable system is discussed. The methods used for the ampacity calculation are described. The fluid circulation approach required to meet the feeder emergency load requirements are discussed. For the feeders that were in service for approximately 40 years, a system life evaluation was performed.

  3. Chapter 2: Machine Design, Fueling, and Heating in ASDEX Upgrade

    SciTech Connect (OSTI)

    Streibl, Bernhard; Lang, Peter Thomas; Leuterer, Fritz; Noterdaeme, Jean-Marie; Staebler, Albrecht [Max-Planck-Institut fuer Plasmaphysik (Germany)

    2003-11-15T23:59:59.000Z

    The machine design, power supply, and machine protection, as well as the different heating systems installed at ASDEX Upgrade are discussed. The available auxiliary heating power of 30 MW, supplied by three different heating systems, allows the power deposition to be varied and species heated over a large range. These three heating systems - neutral beam, ion cyclotron, and electron cyclotron heating - are presented in detail. A description of the pellet refueling system is included, which is successfully used for density control.

  4. Snowflake divertor configuration studies for NSTX-Upgrade

    SciTech Connect (OSTI)

    Soukhanovskii, V A

    2011-11-12T23:59:59.000Z

    Snowflake divertor experiments in NSTX provide basis for PMI development toward NSTX-Upgrade. Snowflake configuration formation was followed by radiative detachment. Significant reduction of steady-state divertor heat flux observed in snowflake divertor. Impulsive heat loads due to Type I ELMs are partially mitigated in snowflake divertor. Magnetic control of snowflake divertor configuration is being developed. Plasma material interface development is critical for NSTX-U success. Four divertor coils should enable flexibility in boundary shaping and control in NSTX-U. Snowflake divertor experiments in NSTX provide good basis for PMI development in NSTX-Upgrade. FY 2009-2010 snowflake divertor experiments in NSTX: (1) Helped understand control of magnetic properties; (2) Core H-mode confinement unchanged; (3) Core and edge carbon concentration reduced; and (4) Divertor heat flux significantly reduced - (a) Steady-state reduction due to geometry and radiative detachment, (b) Encouraging results for transient heat flux handling, (c) Combined with impurity-seeded radiative divertor. Outlook for snowflake divertor in NSTX-Upgrade: (1) 2D fluid modeling of snowflake divertor properties scaling - (a) Edge and divertor transport, radiation, detachment threshold, (b) Compatibility with cryo-pump and lithium conditioning; (2) Magnetic control development; and (3) PFC development - PFC alignment and PFC material choice.

  5. Resolution studies and performance evaluation of the LHCb VELO upgrade

    E-Print Network [OSTI]

    Hynds, Daniel Peter McFarlane; Soler, Paul; Parkes, Christopher

    2015-03-25T23:59:59.000Z

    The LHCb detector at CERN is scheduled to undergo an upgrade during the second long shutdown of the LHC. As part of this upgrade, the vertex detector (VELO) will be replaced with a new hybrid pixel detector, based on an evolution of the Timepix ASIC. The performance of this detector should improve upon that achieved by the current VELO, in addition to facilitating the complete detector readout at 40 MHz. As part of the preparation for this upgrade, this thesis presents the results of studies carried out on the single hit resolution of silicon hybrid pixel detectors. The development of a particle beam telescope has been carried out to allow these studies, shown to operate with track rates in excess of 45 kHz and with a pointing resolution at the device under test of less than 2 ?m. A wide range of sensor types, thicknesses and resistivities have then been tested under different operating conditions and the results presented, with single hit resolutions varying between 4 ?m and 12 ?m depending on the conditi...

  6. Upgrading of raw oil into advanced fuel. Task 5

    SciTech Connect (OSTI)

    Not Available

    1991-10-01T23:59:59.000Z

    The overall objective of the research effort is the determination of the minimum processing requirements to produce high energy density fuels (HEDF) having acceptable fuel specifications. The program encompasses assessing current technology capability; selecting acceptable processing and refining schemes; and generating samples of advanced test fuels. The Phase I Baseline Program is intended to explore the processing alternatives for producing advanced HEDF from two raw synfuel feedstocks, one from Mild Coal Gasification as exemplified by the COALITE process and one from Colorado shale oil. Eight key tasks have been identified as follows: (1) Planning and Environmental Permitting; (2) Transporting and Storage of Raw Fuel Sources and Products; (3) Screening of Processing and Upgrading Schemes; (4) Proposed Upgrading Schemes for Advanced Fuel; (5) Upgrading of Raw Oil into Advanced Fuel (6) Packaging and Shipment of Advanced Fuels; (7) Updated Technical and Economic Assessment; and, (8) Final Report of Phase I Efforts. This topical report summarizes the operations and results of the Phase I Task 5 sample preparation program. The specific objectives of Task 5 were to: Perform laboratory characterization tests on the raw COALITE feed, the intermediate liquids to the required hydroprocessing units and final advanced fuels and byproducts; and produce a minimum of 25-gal of Category I test fuel for evaluation by DOE and its contractors.

  7. comparator Feed CCM/DCM modification

    E-Print Network [OSTI]

    Corrector g + + _ ++ + _ + _ avL CCM/DCM modification Digital Controller _ Driver ADC sDCM iac vac vg iL v PFC. Modifications related to the proposed CCM/DCM predictive current control methods include (CCM) and in DCM. Furthermore, adaptive switching and adaptive switching frequency techniques

  8. Microsoft Word - CF-Radio-Comm-Upgrades-CX.doc

    Broader source: Energy.gov (indexed) [DOE]

    Subpart D, 10 C.F.R. Part 1021): B4.6: "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously...

  9. A blending problem (Taha, Example 2.3-7, almost) An oil refinery has three stages of production: a distillation tower, which

    E-Print Network [OSTI]

    Galvin, David

    : a distillation tower, which takes in crude oil, up to a maximum of 650,000 barrels per day (bbl/day) and produces that maximizes profit. Note: Taha's Example 2.3-7 has distillation tower capacity 1,500,000 bbl/day, and is otherwise the same. 1 #12;Solution Let x1 be daily input to distillation tower Constraint: 0 x1 650000

  10. asdex upgrade h-mode: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    physical control system would do. The real time emulation of both, fusion Zachmann, Gabriel 5 Ghost surfaces and island detection Application to LHD and ASDEX Upgrade...

  11. Project X ICD-2 and its upgrades for Neutrino Factory or Muon Collider

    SciTech Connect (OSTI)

    Lebedev, Valeri; Nagaitsev, Sergei; /Fermilab

    2009-10-01T23:59:59.000Z

    This paper reviews the Initial Configuration Document for Fermilab's Project X and considers its possible upgrades for neutrino factory or muon collider.

  12. Microsoft Word - CX-AlveyMaintenanceHQ_PoleStorageUpgrade_WEB...

    Broader source: Energy.gov (indexed) [DOE]

    4, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Environmental protection system upgrades at pole...

  13. Microsoft Word - CX-DrainageUpgradesMultipleSubsFY13_WEB.docx

    Broader source: Energy.gov (indexed) [DOE]

    3, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: FY13 Environmental Drainage Upgrades at Bonneville...

  14. Microsoft Word - CX-HatwaiSubstationUpgradesFY11_WEB.doc

    Broader source: Energy.gov (indexed) [DOE]

    January 18, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of secondary containment...

  15. Microsoft Word - CX-DixieSubstationUpgradesFY11_WEB.doc

    Broader source: Energy.gov (indexed) [DOE]

    24, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of secondary containment facilities at...

  16. Microsoft Word - CX-WallaWalla-Pendleton-Upgrade_FY14_WEB.docx

    Broader source: Energy.gov (indexed) [DOE]

    3 REPLY TO ATTN OF: KEPRPasco SUBJECT: Environmental Clearance Memorandum Greg Wilfong Lineman Foreman III - TFPF-PASCO Proposed Action: Line upgrade on Bonneville Power...

  17. Low Wind Speed Technology Phase II: Design and Demonstration of On-Site Fabrication of Fluted-Steel Towers Using LITS-Form(TM) Process

    SciTech Connect (OSTI)

    Not Available

    2006-06-01T23:59:59.000Z

    This fact sheet describes NREL's subcontract with Native American Technologies to develop a new method of metal plate forming to produce wind turbine towers.

  18. Trigger LVL1 "Tower Builder" Add: Cables transmission of fast pulses for: The level 1 calorimeter-trigger in ATLAS (sent on 24-01-1995)

    E-Print Network [OSTI]

    Pascual, J

    1994-01-01T23:59:59.000Z

    Trigger LVL1 "Tower Builder" Add: Cables transmission of fast pulses for: The level 1 calorimeter-trigger in ATLAS (sent on 24-01-1995)

  19. We are on a two-acre site near the CSU campus in Fort Collins. We have a 40-foot climbing tower and

    E-Print Network [OSTI]

    tower and several high elements set on poles up to 40 feet in the air. But our Challenge course is more

  20. PERFORMANCE OF AND UPGRADES TO THE SNS COLLIMATOR SYSTEMS

    SciTech Connect (OSTI)

    Plum, Michael A [ORNL; Abdou, Ashraf A [ORNL; Jacobs, Lorelei L [ORNL; Janney, Jim G [ORNL; Geoghegan, Patrick J [ORNL; McTeer, Stephen Mark [ORNL; Popova, Irina [ORNL; Ferguson, Phillip D [ORNL; Zhukov, Alexander P [ORNL

    2009-01-01T23:59:59.000Z

    As the Spallation Neutron Source (SNS) beam power is increased, the collimator systems are becoming correspondingly more important. The High Energy Beam Transport (HEBT) transverse collimators are now routinely used during neutron production. We are in the process of redesigning the HEBT momentum collimation system due to problems with gas production from radiolysis. The Ring collimators are designed for two-stage operation but to date they are mainly used in one-stage mode. In this paper we will discuss the status, the operational performance, and upgrades to the collimation systems.

  1. Searches for Higgs Boson(s) at the Upgraded Tevatron

    E-Print Network [OSTI]

    Gregorio Bernardi; for the CDF; D0 collaborations

    2005-07-14T23:59:59.000Z

    We summarize the status of Higgs boson searches at the upgraded Fermilab Tevatron performed by the DO and CDF collaborations. We report on three categories of searches, namely 1) the search for the Standard Model Higgs boson (p\\bar{p} --> H, WH or ZH, with H --> WW* and/or H --> b\\bar{b}), 2) the search for the minimal supersymmetric Higgs boson using p\\bar{p} --> hb\\bar{b} --> b\\bar{b}b\\bar{b} and p\\bar{p} --> hX --> tau tau X, 3) the search for doubly charged Higgs boson.

  2. Better Buildings Neighborhood Program Data Upgrade Projects | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The FutureCommentsEnergy Christopher|for ConsumersDashboardEnergy Upgrade

  3. Upgrade Boilers with Energy-Efficient Burners | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your DensityEnergy U.S.-China Electric Vehicle and03/02 TUE 08:59 FAX 423DepartmentUpgrade Boilers with

  4. A Single Tower Configuration of the Modular Gamma Box Counter System - 13392

    SciTech Connect (OSTI)

    Morris, K.; Nakazawa, D.; Francalangia, J.; Gonzalez, H. [Canberra Industries Inc., 800 Research Parkway, Meriden, CT, 06450 (United States)] [Canberra Industries Inc., 800 Research Parkway, Meriden, CT, 06450 (United States)

    2013-07-01T23:59:59.000Z

    Canberra's Standard Gamma Box Counter System is designed to perform accurate quantitative assays of gamma emitting nuclides for a wide range of large containers including B-25 crates and ISO shipping containers. Using a modular building-block approach, the system offers tremendous flexibility for a variety of measurement situations with wide ranges of sample activities and throughput requirements, as well as the opportunity to modify the configuration for other applications at a later date. The typical configuration consists of two opposing towers each equipped with two high purity germanium detectors, and an automated container trolley. This paper presents a modified configuration, consisting of a single tower placed inside a measurement trailer with three detector assemblies, allowing for additional vertical segmentation as well as a viewing a container outside the trailer through the trailer wall. An automatic liquid nitrogen fill system is supplied for each of the detectors. The use of a forklift to move the container for horizontal segmentation is accommodated by creating an additional operational and calibration set-up in the NDA 2000 software to allow for the operator to rotate the container and assay the opposite side, achieving the same sensitivity as a comparable two-tower system. This Segmented Gamma Box Counter System retains the core technologies and design features of the standard configuration. The detector assemblies are shielded to minimize interference from environmental and plant background, and are collimated to provide segmentation of the container. The assembly positions can also be modified in height and distance from the container. The ISOCS calibration software provides for a flexible approach to providing the calibrations for a variety of measurement geometries. The NDA 2000 software provides seamless operation with the current configuration, handling the data acquisition and analysis. In this paper, an overview of this system is discussed, along with the measured performance results, calibration methodology and verification, and minimum detectable activity levels. (authors)

  5. Measurement of the atmospheric muon depth intensity relation with the NEMO Phase-2 tower

    E-Print Network [OSTI]

    S. Aiello; F. Ameli; M. Anghinolfi; G. Barbarino; E. Barbarito; F. Barbato; N. Beverini; S. Biagi; B. Bouhadef; C. Bozza; G. Cacopardo; M. Calamai; C. Calì; A. Capone; F. Caruso; A. Ceres; T. Chiarusi; M. Circella; R. Cocimano; R. Coniglione; M. Costa; G. Cuttone; C. D'Amato; A. D'Amico; G. De Bonis; V. De Luca; N. Deniskina; G. De Rosa; F. Di Capua; C. Distefano; P. Fermani; L. A. Fusco; F. Garufi; V. Giordano; A. Gmerk; R. Grasso; G. Grella; C. Hugon; M. Imbesi; V. Kulikovskiy; G. Larosa; D. Lattuada; K. P. Leismueller; E. Leonora; P. Litrico; A. Lonardo; F. Longhitano; D. Lo Presti; E. Maccioni; A. Margiotta; A. Martini; R. Masullo; P. Migliozzi; E. Migneco; A. Miraglia; C. M. Mollo; M. Mongelli; M. Morganti; P. Musico; M. Musumeci; C. A. Nicolau; A. Orlando; R. Papaleo; C. Pellegrino; M. G. Pellegriti; C. Perrina; P. Piattelli; C. Pugliatti; S. Pulvirenti; A. Orselli; F. Raffaelli; N. Randazzo; G. Riccobene; A. Rovelli; M. Sanguineti; P. Sapienza; V. Sciacca; I. Sgura; F. Simeone; V. Sipala; F. Speziale; M. Spina; A. Spitaleri; M. Spurio; S. M. Stellacci; M. Taiuti; G. Terreni; L. Trasatti; A. Trovato; C. Ventura; P. Vicini; S. Viola; D. Vivolo

    2014-12-03T23:59:59.000Z

    The results of the analysis of the data collected with the NEMO Phase-2 tower, deployed at 3500 m depth about 80 km off-shore Capo Passero (Italy), are presented. Cherenkov photons detected with the photomultipliers tubes were used to reconstruct the tracks of atmospheric muons. Their zenith-angle distribution was measured and the results compared with Monte Carlo simulations. An evaluation of the systematic effects due to uncertainties on environmental and detector parameters is also included. The associated depth intensity relation was evaluated and compared with previous measurements and theoretical predictions. With the present analysis, the muon depth intensity relation has been measured up to 13 km of water equivalent.

  6. Property:CoolingTowerWaterUseWinterGross | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation,PillarPublicationType Jump to:CoolingTowerWaterUseWinterGross Jump to: navigation,

  7. Workers Safely Tear Down Towers at Manhattan Project Site | Department of

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 Russian Nuclear Warheads|ofEvents »SSLEnergy Workers Safely Tear Down Towers

  8. Influence of gas injection location and magnetic perturbations on ICRF antenna performance in ASDEX Upgrade

    SciTech Connect (OSTI)

    Bobkov, V.; Bilato, R.; Dux, R.; Faugel, H.; Kallenbach, A.; Müller, H. W.; Potzel, S.; Pütterich, Th.; Suttrop, W. [Max-Planck-Institut für Plasmaphysik, EURATOM-Association, D-85748 (Germany); Stepanov, I.; Noterdaeme, J.-M. [Max-Planck-Institut für Plasmaphysik, EURATOM-Association, D-85748, Germany and Department of Applied Physics, Gent University, 9000 Gent (Belgium); Jacquet, P.; Monakhov, I. [Euratom/CCFE Fusion Association, Culham Science Centre, Abingdon, OX14 3DB (United Kingdom); Colas, L. [CEA, IRFM, 13108 Saint Paul-lez-Durance (France); Czarnecka, A. [Institute of Plasma Physics and Laser Microfusion, Association EURATOM-IPPLM, Warsaw (Poland); Collaboration: ASDEX Upgrade Team

    2014-02-12T23:59:59.000Z

    In ASDEX Upgrade H-modes with H{sub 98}?0.95, similar effect of the ICRF antenna loading improvement by local gas injection was observed as previously in L-modes. The antenna loading resistance R{sub a} between and during ELMs can increase by more than 25% after a switch-over from a deuterium rate of 7.5?10{sup 21} D/s injected from a toroidally remote location to the same amount of deuterium injected close to an antenna. However, in contrast to L-mode, this effect is small in H-mode when the valve downstream w.r.t. parallel plasma flows is used. In L-mode, a non-linearity of R{sub a} at P{sub ICRP}<30 kW is observed when using the gas valve integrated in antenna. Application of magnetic perturbations (MPs) in H-mode discharges leads to an increase of R{sub a}>30% with no effect of spectrum and phase of MPs on R{sub a} found so far. In the case ELMs are fully mitigated, the antenna loading is higher and steadier. In the case ELMs are not fully mitigated, the value of R{sub a} between ELMs is increased. Looking at the W source modification for the improved loading, the local gas injection is accompanied by decreased values of tungsten (W) influx ?{sub W} from the limiters and its effective sputtering yield Y{sub w}, with the exception of the locations directly at the antenna gas valve. Application of MPs leads to increase of ?{sub W} and Y{sub w} for some of the MP phases. With nitrogen seeding in the divertor, ICRF is routinely used to avoid impurity accumulation and that despite enhanced ?{sub W} and Y{sub W} at the antenna limiters.

  9. Modification No. M500 Supplemental Agreement to

    E-Print Network [OSTI]

    Johnson, Peter D.

    .S. DEPARTMENT OF ENERGY AND BROOKHAVEN SCIENCE ASSOCIATES, LLC ATTACHMENT J.2 APPENDIX B PERFORMANCE EVALUATION AND MEASUREMENT PLAN FISCAL YEAR 2013 BROOKHAVEN NATIONAL LABORATORY #12;Appendix B Modification No. M500

  10. Modification No. M338 Supplemental Agreement to

    E-Print Network [OSTI]

    Johnson, Peter D.

    .S. DEPARTMENT OF ENERGY AND BROOKHAVEN SCIENCE ASSOCIATES, LLC ATTACHMENT J.2 APPENDIX B PERFORMANCE EVALUATION AND MEASUREMENT PLAN FISCAL YEAR 2011 BROOKHAVEN NATIONAL LABORATORY #12;Appendix B Modification No. M338

  11. Modification No. M436 Supplemental Agreement to

    E-Print Network [OSTI]

    Johnson, Peter D.

    .S. DEPARTMENT OF ENERGY AND BROOKHAVEN SCIENCE ASSOCIATES, LLC ATTACHMENT J.2 APPENDIX B PERFORMANCE EVALUATION AND MEASUREMENT PLAN FISCAL YEAR 2012 BROOKHAVEN NATIONAL LABORATORY #12;Appendix B Modification No. M436

  12. Modification No. M253 Supplemental Agreement to

    E-Print Network [OSTI]

    Johnson, Peter D.

    .S. DEPARTMENT OF ENERGY AND BROOKHAVEN SCIENCE ASSOCIATES, LLC ATTACHMENT J.2 APPENDIX B PERFORMANCE EVALUATION AND MEASUREMENT PLAN FISCAL YEAR 2010 BROOKHAVEN NATIONAL LABORATORY #12;Appendix B Modification No. M253

  13. Firearms Modifications List- June 13, 2012

    Broader source: Energy.gov [DOE]

    This document contains the currently-approved protective force "Firearms Modification List" referred to in Department of Energy Order 473.3, Protection Program Operations. This supersedes any previous versions of this document

  14. Modification of Defect Structures in Graphene by Electron Irradiation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Modification of Defect Structures in Graphene by Electron Irradiation: Ab Initio Molecular Dynamics Simulations. Modification of Defect Structures in Graphene by Electron...

  15. Interface Modifications by Anion Acceptors for High Energy Lithium...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Modifications by Anion Acceptors for High Energy Lithium Ion Batteries. Interface Modifications by Anion Acceptors for High Energy Lithium Ion Batteries. Abstract: Li-rich, Mn-rich...

  16. Analysis of NSTX Upgrade OH Magnet and Center Stack

    SciTech Connect (OSTI)

    A. Zolfaghari, P. Titus, J. Chrzanowski, A. Salehzadeh, F. Dahlgren

    2010-11-30T23:59:59.000Z

    The new ohmic heating (OH) coil and center stack for the National Spherical Torus Experiment (NSTX) upgrade are required to meet cooling and structural requirements for operation at the enhanced 1 Tesla toroidal field and 2 MA plasma current. The OH coil is designed to be cooled in the time between discharges by water flowing in the center of the coil conductor. We performed resistive heating and thermal hydraulic analyses to optimize coolant channel size to keep the coil temperature below 100 C and meet the required 20 minute cooling time. Coupled electromagnetic, thermal and structural FEA analyses were performed to determine if the OH coil meets the requirements of the structural design criteria. Structural response of the OH coil to its self-field and the field from other coils was analyzed. A model was developed to analyze the thermal and electromagnetic interaction of centerstack components such as the OH coil, TF inner legs and the Bellville washer preload mechanism. Torsional loads from the TF interaction with the OH and poloidal fields are transferred through the TF flag extensions via a torque transfer coupling to the rest of the tokamak structure. A 3D FEA analysis was performed to qualify this design. The results of these analyses, which will be presented in this paper, have led to the design of OH coil and centerstack components that meet the requirements of the NSTX-upgrade structural design criteria.

  17. ECE RADIOMETER UPGRADE ON THE DIII-D TOKAMAK

    SciTech Connect (OSTI)

    AUSTIN, ME; LOHR, J

    2002-08-01T23:59:59.000Z

    OAK A271 ECE RADIOMETER UPGRADE ON THE DIII-D TOKAMAK. The electron cyclotron emission (ECE) heterodyne radiometer diagnostic on DIII-D has been upgraded with the addition of eight channels for a total of 40. The new, higher frequency channels allow measurements of electron temperature into the magnetic axis in discharges at maximum field, 2.15 T. The complete set now extends over the full usable range of second harmonic emission frequencies at 2.0 T covering radii from the outer edge inward to the location of third harmonic overlap on the high field side. Full coverage permits the measurement of heat pulses and magnetohydrodynamic (MHD) fluctuations on both sides of the magnetic axis. In addition, the symmetric measurements are used to fix the location of the magnetic axis in tokamak magnetic equilibrium reconstructions. Also, the new higher frequency channels have been used to determine central T{sub e} with good time resolution in low field, high density discharges using third harmonic ECE in the optically gray and optically thick regimes.

  18. RF Power Upgrade for CEBAF at Jefferson Laboratory

    SciTech Connect (OSTI)

    Andrew Kimber,Richard Nelson

    2011-03-01T23:59:59.000Z

    Jefferson Laboratory (JLab) is currently upgrading the 6GeV Continuous Electron Beam Accelerator Facility (CEBAF) to 12GeV. As part of the upgrade, RF systems will be added, bringing the total from 340 to 420. Existing RF systems can provide up to 6.5 kW of CW RF at 1497 MHZ. The 80 new systems will provide increased RF power of up to 13 kW CW each. Built around a newly designed and higher efficiency 13 kW klystron developed for JLab by L-3 Communications, each new RF chain is a completely revamped system using hardware different than our present installations. This paper will discuss the main components of the new systems including the 13 kW klystron, waveguide isolator, and HV power supply using switch-mode technology. Methodology for selection of the various components and results of initial testing will also be addressed. Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177. The U.S. Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce this manuscript for U.S. Government purposes.

  19. 12 GeV Upgrade Project - Cryomodule Production

    SciTech Connect (OSTI)

    J. Hogan, A. Burrill, G.K. Davis, M.A. Drury, M. Wiseman

    2012-07-01T23:59:59.000Z

    The Thomas Jefferson National Accelerator Facility (Jefferson Lab) is producing ten 100+MV SRF cryomodules (C100) as part of the CEBAF 12 GeV Upgrade Project. Once installed, these cryomodules will become part of an integrated accelerator system upgrade that will result in doubling the energy of the CEBAF machine from 6 to 12 GeV. This paper will present a complete overview of the C100 cryomodule production process. The C100 cryomodule was designed to have the major components procured from private industry and assembled together at Jefferson Lab. In addition to measuring the integrated component performance, the performance of the individual components is verified prior to being released for production and assembly into a cryomodule. Following a comprehensive cold acceptance test of all subsystems, the completed C100 cryomodules are installed and commissioned in the CEBAF machine in preparation of accelerator operations. This overview of the cryomodule production process will include all principal performance measurements, acceptance criterion and up to date status of current activities.

  20. STANDARDIZATION OF CEBAF 12 GEV UPGRADE CAVITY TESTING

    SciTech Connect (OSTI)

    Tiffany Bass, G. Davis, Christiana Wilson, Mircea Stirbet

    2012-07-01T23:59:59.000Z

    CEBAF 12GeV upgrade project includes 80 new 7-cell cavities to form 10 cryomodules. Each cavity underwent RF qualification at 2.07K using a high power accelerating gradient test and an HOM survey in Jefferson Lab's Vertical Testing Area (VTA) before cavity string assembly. In order to ensure consistently high quality data, updated cavity testing procedures and analysis were implemented and used by a group of VTA operators. For high power tests, a cavity testing procedure was developed and used in conjunction with a LabVIEW program to collect the test data. Additionally while the cavity was at 2.07K, an HOM survey was performed using a network analyzer and a combination of Excel and Mathematica programs. Data analysis was standardized and an online logbook, Pansophy, was used for data storage and mining. The Pansophy system allowed test results to be easily summarized and searchable across all cavity tests. In this presentation, the CEBAF 12GeV upgrade cavity testing procedure, method for data analysis, and results reporting results will be discussed.