  1. NSTX Upgrade Project Execution Plan NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    NSTX Upgrade Project Federal Project Director, SC-PSO Administrative Change Approved by Office, ou=DOE-PSO, email=aindelicato@pppl.gov, c=US Date: 2012.10.15 09:41:43 -04'00' #12;NSTX Upgrade Description of Changes A 1/11/10 PPEP Initial Issue by PPPL & PSO, but not approved by OFES B 4/5/10 PPEP Cost

  2. NSTX Upgrade Project Execution Plan NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    _____________________________ Manager, SC-PSO _____________________________ J. Makiel NSTX Upgrade Project Federal Project Director, SC-PSO Description of Changes A 1/11/10 PPEP Initial Issue by PPPL & PSO, but not approved by OFES B 4/5/10 PPEP Cost

  3. NSTX Upgrade Project Execution Plan NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    10/12/2012 Update to WBS Level 2 Threshold (top of page 20), Change DOE Federal Project Director ..............................................................................................................................1 1.2.1 DOE-approved project documents:..............................................................................................1 1.2.2 DOE certified institutional systems or plans

  4. Rank Project Name Directorate,

    E-Print Network [OSTI]

    ,000 0.5 400 lbs industrial waste, eliminates potential for oil contaminated run-off 3 RetrofitRank Project Name Directorate, Dept/Div and POC Cost Savings Payback (Years) Waste Reduction 1 Minimization of Silver Waste from Silver-Staining Electrophoretic Mini-Gels Life Sciences, Biology (B

  5. ISIS Project Upgrade Campus Community

    E-Print Network [OSTI]

    Massachusetts at Lowell, University of

    ISIS Project Upgrade Campus Community Page Navigation Page | 1 Page navigation has changed in the ISIS Application. This document provides you with the new location of all your key Campus Community the Navigation Pagelets": ISIS.UML..EDU #12;

  6. Cyclotron Institute Upgrade Project

    SciTech Connect (OSTI)

    Clark, Henry; Yennello, Sherry; Tribble, Robert

    2014-08-26

    The Cyclotron Institute at Texas A&M University has upgraded its accelerator facilities to extend research capabilities with both stable and radioactive beams. The upgrade is divided into three major tasks: (1) re-commission the K-150 (88”) cyclotron, couple it to existing beam lines to provide intense stable beams into the K-500 experimental areas and use it as a driver to produce radioactive beams; (2) develop light ion and heavy ion guides for stopping radioactive ions created with the K-150 beams; and (3) transport 1+ ions from the ion guides into a charge-breeding electron-cyclotron-resonance ion source (CB-ECR) to produce highly-charged radioactive ions for acceleration in the K-500 cyclotron. When completed, the upgraded facility will provide high-quality re-accelerated secondary beams in a unique energy range in the world.

  7. Protection Upgrades Project (4580)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeedingProgramExemptions |(Conference)ProjectProposedAmerica'sTrap and

  8. Infrastructure and Operations Improvement Project Director |...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Infrastructure and Operations Improvement Project Director Supervisor(s): Adam Cohen, COO, Director's Office Staff: ENG 08 Requisition Number: 1500151 The Infrastructure and...

  9. Advanced Photon Source Upgrade Project

    ScienceCinema (OSTI)

    Mitchell, John; Gibson, Murray; Young, Linda; Joachimiak, Andrzej

    2013-04-19

    Upgrade to Advanced Photon Source announced by Department Of Energy. Read more: http://go.usa.gov/ivZ

  10. MEMORANDUM FOR JOHN M. SATTLER DIRECTOR BROOKHAVEN FEDERAL PROJECT...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    l 4 2011 MEMORANDUM FOR JOHN M. SATTLER DIRECTOR BROOKHAVEN FEDERAL PROJECT OFFICE FROM: SUBJECT: Designation of Federal Project Director and Deputy Federal Project Director for...

  11. Pacific DC Intertie Upgrade Project Status Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    T I O N Pre-Decisional. For Discussion Purposes Only. PDCI Upgrade Project Replace aging Celilo 4 converter terminal with a new 2 converter terminal rated 560kV and 3410A...

  12. NSTX Upgrade Project Execution Plan NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    ..............................................................................................................................1 1.2.1 DOE-approved project documents:..............................................................................................1 1.2.2 DOE certified institutional systems or plans.......................................................................................................4 DOE Level I Milestones

  13. Approval of CD-2 for the National Spherical Torus Experiment (NSTX) Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    of compact and high normalized pressure "spherical torus" (ST) magnetic fusion plasmas. The compact Plasma Physics Laboratory DOE Princeton Site Office (SSO) Office of Science Office of Fusion Energy Selection and Cost Range for the NSTX Upgrade Project was approved by the Associate Director for Fusion

  14. Rank Project Name Directorate, Dept/Div

    E-Print Network [OSTI]

    gallons industrial waste 7 Oil-free Vacuum Pumps and new Catalyst EENS, Environmental Sciences Dept. (L. Nunnermacker) $6,000 $3,516 1.7 50 pounds of hazardous waste 8 Bulk Motor Oil F&A, Staff Services (H. HauptmanRank Project Name Directorate, Dept/Div and POC Cost Savings Payback (Years) Waste Reduction 1

  15. Rank Project Name Directorate, Dept/Div

    E-Print Network [OSTI]

    Electronic Recycling Procurement & Property Management (John Collins) $3,500 TBD N/A 10 tons of e-waste 7 Oil,000 $830.00 7.23 6 liters of industrial waste 8 Disposal of #6 Fuel Oil * EENS (Yousif Celebi $500 $4Rank Project Name Directorate, Dept/Div and POC Cost Savings Payback (Years) Waste Reduction 1

  16. Health and Safety Plan for NSTX Upgrade Project Tasks

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Draft 0 6/17/11 1 Health and Safety Plan for NSTX Upgrade Project Tasks in the NSTX Test Cell: _____________________________________________________________ Jerry Levine, Environment, Safety, Health and Security Head Reviewed by describes the structure and implementation of the Health and Safety Plan for the NSTX Upgrade Project work

  17. Health and Safety Plan for NSTX Upgrade Project Tasks

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Health and Safety Plan for NSTX Upgrade Project Tasks in the NSTX Test Cell PRINCETON PLASMA....~_____...L....,L....q..l:::::.......:.J Larry Dudek, NSTX Center Stack Manager Reviewed by: I( Jer evine, Environment, Safety, Health and S This document describes the structure and implementation of the Health and Safety Plan for the NSTX Upgrade

  18. Request for Proposals for New or Upgraded Transmission Line Projects...

    Office of Environmental Management (EM)

    Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012 Request for...

  19. RECOVERY ACT: TAPOCO PROJECT: CHEOAH UPGRADE

    SciTech Connect (OSTI)

    Tran, Paul

    2013-02-28

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  20. Advanced Photon Source Upgrade Project - Materials

    ScienceCinema (OSTI)

    Gibbson, Murray;

    2013-04-19

    An upgrade to Advanced Photon Source announced by DOE - http://go.usa.gov/ivZ -- will help scientists break through bottlenecks in materials design in order to develop materials with desirable functions.

  1. Advanced Photon Source Upgrade Project - Energy

    ScienceCinema (OSTI)

    Gibson, Murray; Chamberlain, Jeff; Young, Linda

    2013-04-19

    An upgrade to the Advanced Photon Source (announced by DOE - http://go.usa.gov/ivZ) will help scientists better understand complex environments such as in catalytic reactions.

  2. Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades

    Office of Energy Efficiency and Renewable Energy (EERE)

    Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades

  3. Pacific Direct Current Intertie (PDCI) Upgrade Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Reliability Projects Expand Projects Skip navigation links Line Projects Big Eddy-Knight Central Ferry Lower Monumental Grand Coulee Transmission Line Replacement...

  4. Low emittance upgrade for CANDLE project

    E-Print Network [OSTI]

    Zanyan, G S

    2015-01-01

    To improve the performance of CANDLE synchrotron light source and stay competitive with recently proposed low emittance upgrade programs in the world we have developed new low emittance lattices for CANDLE booster and storage ring. These lattices have been designed taking into account the new developments in magnet fabrication technology and the multi-bend achromat concept. The main design considerations, the linear and non-linear beam dynamics aspects of the modified lattices are presented.

  5. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    0 1,487 1,538,883.45 398,403.27 398,403.27 Job: 7200 - Center Stack Management-DUDEK Subtotal 1,222 02NOV09A 02NOV09A 30SEP14 30SEP14 0 1,487 1,538,883.45 398,403.27 398,403.27 Project Management 7200

  6. Categorical Exclusion 4598: Security Upgrade Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsiclouddenDVA N C E D B LReportsDeterminatIonFornl Project Title:

  7. Project X ICD-2 and its upgrades for Neutrino Factory or Muon Collider

    SciTech Connect (OSTI)

    Lebedev, Valeri; Nagaitsev, Sergei; /Fermilab

    2009-10-01

    This paper reviews the Initial Configuration Document for Fermilab's Project X and considers its possible upgrades for neutrino factory or muon collider.

  8. Portsmouth Decommissioning and Decontamination Project Director...

    Energy Savers [EERE]

    Portsmouth Waste Disposition Record of Decision Portsmouth RIFS Report for the Process Buildings and Complex Facilities Decontamination and Decommissioning Evaluation Project...

  9. Director of IT Services Project Office

    E-Print Network [OSTI]

    Birmingham, University of

    Who we are Quality Yvonne O'Byrne Facilities Management John Owen Networks John Turnbull Customer IT Support Nick Foley Heather Behan Network operations Cabling and wireless network Directory and authentication Voice & mobile services Project management services Project office Process analysis IT Service

  10. Director, Salt Waste Processing Facility Project Office

    Broader source: Energy.gov [DOE]

    This position is located within The Department of Energy (DOE) Savannah River (SR) Operations Office, Salt Waste Processing Facility Project Office (SWPFPO). SR is located in Aiken, South Carolina....

  11. Fernald Environmental Management Project Director's Final Findings...

    Office of Environmental Management (EM)

    SEPI o 1993 OHIO ENlmo In the Matter of: U. S. Department of Energy Femald Environmental Management Project P.O. Box 389705 Cincinnati, Ohio 45239 Issue Date: Effective Date: SEP1...

  12. Fernald Environmental Management Project Director's Final Findings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ohio U.S. EPA ID No: OH6890008976 Mr. Phil Hammric U.S. Department of Energy Femald Environmental Management Project P.O. Box 389705 Cincinnati, Ohio 45239 Mr. John Bradbume Femald...

  13. 12 GeV Upgrade Project - Cryomodule Production

    SciTech Connect (OSTI)

    J. Hogan, A. Burrill, G.K. Davis, M.A. Drury, M. Wiseman

    2012-07-01

    The Thomas Jefferson National Accelerator Facility (Jefferson Lab) is producing ten 100+MV SRF cryomodules (C100) as part of the CEBAF 12 GeV Upgrade Project. Once installed, these cryomodules will become part of an integrated accelerator system upgrade that will result in doubling the energy of the CEBAF machine from 6 to 12 GeV. This paper will present a complete overview of the C100 cryomodule production process. The C100 cryomodule was designed to have the major components procured from private industry and assembled together at Jefferson Lab. In addition to measuring the integrated component performance, the performance of the individual components is verified prior to being released for production and assembly into a cryomodule. Following a comprehensive cold acceptance test of all subsystems, the completed C100 cryomodules are installed and commissioned in the CEBAF machine in preparation of accelerator operations. This overview of the cryomodule production process will include all principal performance measurements, acceptance criterion and up to date status of current activities.

  14. NSTX Upgrade Project Final Design Review June 22 -24, 2011 1 NSTX Supported by

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    NSTX Upgrade Project ­ Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W Photonics New York U Old Dominion U ORNL PPPL PSI Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Plasma Physics Laboratory NSTX Upgrade Project Final Design Review LSB, B318 June 22-24, 2011 1 Monday

  15. Soil Management Plan For The Potable Water System Upgrades Project

    SciTech Connect (OSTI)

    Field, S. M.

    2007-04-01

    This plan describes and applies to the handling and management of soils excavated in support of the Y-12 Potable Water Systems Upgrades (PWSU) Project. The plan is specific to the PWSU Project and is intended as a working document that provides guidance consistent with the 'Soil Management Plan for the Oak Ridge Y-12 National Security Complex' (Y/SUB/92-28B99923C-Y05) and the 'Record of Decision for Phase II Interim Remedial Actions for Contaminated Soils and Scrapyard in Upper East Fork Popular Creek, Oak Ridge, Tennessee' (DOE/OR/01-2229&D2). The purpose of this plan is to prevent and/or limit the spread of contamination when moving soil within the Y-12 complex. The major feature of the soil management plan is the decision tree. The intent of the decision tree is to provide step-by-step guidance for the handling and management of soil from excavation of soil through final disposition. The decision tree provides a framework of decisions and actions to facilitate Y-12 or subcontractor decisions on the reuse of excavated soil on site and whether excavated soil can be reused on site or managed as waste. Soil characterization results from soil sampling in support of the project are also presented.

  16. Conceptual design report for Project W-420, stack monitoring upgrade

    SciTech Connect (OSTI)

    Lott, D.T., Fluor Daniel Hanford

    1997-03-10

    This document provides the Conceptual Design for the upgrade of seven designated Tank Farm stacks to meet NESHAP Title 40, CFR, Part 61, Sub-part H requirements.

  17. Energy and Emissions Savings through Insulation Upgrade Projects 

    E-Print Network [OSTI]

    Lettich, M.

    2008-01-01

    The presentation demonstrates the value of including insulation system assessment, repairs and upgrades on a facility's physical function and its importance in the overall energy and environmental management program. Financial and environmental...

  18. Director

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory ofDid you not find what you were lookingAboutDirector Director Deputy Director

  19. Plains & Eastern Clean Line Project Proposal for New or Upgraded...

    Broader source: Energy.gov (indexed) [DOE]

    Page 45 of 53 gas-fired combined-cycle project that interconnected to the Palo Verde Nuclear Generating Station, which served the western grid. This project became commercial...

  20. Better Buildings Neighborhood Program Data Upgrade Projects | Department of

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann JacksonDepartment|Marketing, LLC |Energy Advisor the fish ladderEnergy project

  1. Post Critical Decision-4 Mark Arenaz, Federal Project Director

    Energy Savers [EERE]

    Cleanup Project (ICP) used in-situ grouting to stabilize buried waste and reduce the migration of specific radioactive contaminates to the aquifer. The action was accomplished...

  2. Darrie Ganzhorn: Director of Programs and Operations, Homeless Garden Project

    E-Print Network [OSTI]

    Reti, Irene H.

    2010-01-01

    project, and learning a lot about compost and reallybeing excited about compost and how it worked in ourDavidson was working with compost and working with getting

  3. Performance Studies of Micromegas Chambers for the New Small Wheel Upgrade Project

    E-Print Network [OSTI]

    Ntekas, Konstantinos; The ATLAS collaboration

    2015-01-01

    Micromegas, an abbreviation for Micro MEsh Gaseous Structure (MM), is a robust detector with excellent spatial resolution and high rate capability. An $R\\&D$ activity, called Muon ATLAS MicroMegas Activity (MAMMA), was initiated in 2007 in order to explore the potential of the MM technology for use in the ATLAS experiment. After several years of prototyping and testing, the ATLAS collaboration has chosen the MM technology along with the small-strip Thin Gap Chambers (sTGC) for the upgrade of the inner muon station in the high-rapidity region, the so called New Small Wheel (NSW) upgrade project. It will employ eight layers of MM and eight layers of sTGC detectors per wheel. The NSW project requires fully efficient MM chambers, able to cope with the maximum expected rate of $15\\,\\mathrm{kHz/cm^2}$ featuring single plane spatial resolution better than $100\\,\\mu\\mathrm{m}$. The MM detectors will cover a total active area of $\\sim1200\\,\\mathrm{m^2}$ and will be operated in a moderate magnetic field with intens...

  4. Achievements of the ATLAS Upgrade Planar Pixel Sensors R&D Project

    E-Print Network [OSTI]

    C. Nellist

    2014-11-20

    In the framework of the HL-LHC upgrade, the ATLAS experiment plans to introduce an all-silicon inner tracker to cope with the elevated occupancy. To investigate the suitability of pixel sensors using the proven planar technology for the upgraded tracker, the ATLAS Planar Pixel Sensor R&D Project (PPS) was established comprising 19 institutes and more than 90 scientists. The paper provides an overview of the research and development project and highlights accomplishments, among them: beam test results with planar sensors up to innermost layer fluences (> 10^16 n_eq cm^2); measurements obtained with irradiated thin edgeless n-in-p pixel assemblies; recent studies of the SCP technique to obtain almost active edges by postprocessing already existing sensors based on scribing, cleaving and edge passivation; an update on prototyping efforts for large areas: sensor design improvements and concepts for low-cost hybridisation; comparison between Secondary Ion Mass Spectrometry results and TCAD simulations. Together, these results allow an assessment of the state-of-the-art with respect to radiation-hard position-sensitive tracking detectors suited for the instrumentation of large areas.

  5. Needs analysis and project schedule for the Los Alamos National Laboratory (LANL) Health Physics Analysis Laboratory (HPAL) upgrade

    SciTech Connect (OSTI)

    Rhea, T.A.; Rucker, T.L.; Stafford, M.W.

    1990-09-28

    This report is a needs assessment and project schedule for the Health Physics Analysis Laboratory (HPAL) upgrade project at Los Alamos National Laboratory (LANL). After reviewing current and projected HPAL operations, two custom-developed laboratory information management systems (LIMS) for similar facilities were reviewed; four commercially available LIMS products were also evaluated. This project is motivated by new regulations for radiation protection and training and by increased emphasis on quality assurance (QA). HPAL data are used to: protect the health of radiation workers; document contamination levels for transportation of radioactive materials and for release of materials to the public for uncontrolled use; and verify compliance with environmental emission regulations. Phase 1 of the HPAL upgrade project concentrates on four types of counting instruments which support in excess of 90% of the sample workload at the existing central laboratories. Phase 2 is a refinement phase and also integrates summary-level databases on the central Health, Safety, and Environment (HSE) VAX. Phase 3 incorporates additional instrument types and integrates satellite laboratories into the HPAL LIMS. Phase 1 will be a multi-year, multimillion dollar project. The temptation to approach the upgrade of the HPAL program in a piece meal fashion should be avoided. This is a major project, with clearly-defined goals and priorities, and should be approached as such. Major programmatic and operational impacts will be felt throughout HSE as a result of this upgrade, so effective coordination with key customer contacts will be critical.

  6. Project Management Update - Paul Bosco, Director, Office of Acquisition &

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann Jackson About1996How toPolycrystallineEmergingInformation Resources1stinProjectProject Mgt

  7. Fermilab | Directorate | Office of Project Management Oversight (OPMO)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation Current HABFES OctoberEvan Racah861MayArt Series presents:featureProject

  8. Fermilab | Directorate | Office of Project Management Oversight (OPMO) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journal Article) | SciTech ConnectTimothy MeyerFermilabDOE Project

  9. Fermilab | Directorate | Office of Project Management Oversight (OPMO) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journal Article) | SciTech ConnectTimothy MeyerFermilabDOE ProjectOPMO

  10. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect (OSTI)

    NONE

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  11. Certified Federal Project Directors | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorkingLosThe 26thI D- 6 0GrantsTheBurtonCertified Federal Project Directors

  12. EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to upgrade the Sewer System at the U.S. Department of Energy's Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho.  The...

  13. EA-1937: Pacific Direct Intertie Upgrade Project; Lake, Jefferson, Crook, Deschutes, and Wasco Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration prepared an EA that assesses the potential environmental impacts of a proposal to replace equipment at BPA’s Celilo converter station and upgrade equipment on the Celilo-Sylmar 500-kilovolt (kV) transmission line from The Dalles, Oregon, to the Nevada-Oregon border.

  14. AN E&E PUBLISHING SERVICE ENERGY EFFICIENCY: Tenn. project to test range of residential upgrades

    E-Print Network [OSTI]

    to 35 years old and ready for upgrades to heating, ventilation and air conditioning systems, which make and the air sealing of the attic," he said. "Once you do that, you spend less on your heating and air was insulated with material packed under the attic floor, above which a cooling unit was located. In the second

  15. Montana-to-Washington Transmission System Upgrade Project - M2W

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Reliability Projects Expand Projects Skip navigation links Line Projects Big Eddy-Knight Central Ferry Lower Monumental Grand Coulee Transmission Line Replacement...

  16. Director's CD-3b Readiness Review of the MINERvA Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory ofDid you not find what you were lookingAboutDirector Director Deputy

  17. GENII (Generation II): The Hanford Environmental Radiation Dosimetry Software System: Volume 3, Code maintenance manual: Hanford Environmental Dosimetry Upgrade Project

    SciTech Connect (OSTI)

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

    1988-09-01

    The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). This coupled system of computer codes is intended for analysis of environmental contamination resulting from acute or chronic releases to, or initial contamination of, air, water, or soil, on through the calculation of radiation doses to individuals or populations. GENII is described in three volumes of documentation. This volume is a Code Maintenance Manual for the serious user, including code logic diagrams, global dictionary, worksheets to assist with hand calculations, and listings of the code and its associated data libraries. The first volume describes the theoretical considerations of the system. The second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. 7 figs., 5 tabs.

  18. Canada's heavy oil, bitumen upgrading activity is growing

    SciTech Connect (OSTI)

    Corbett, R.A.

    1989-06-26

    Heavy oil and bitumen upgrading activity in Canada is surging with the recent start-up of two new upgraders and with plans to build others. These new upgraders make use of modern hydrocracking technology. Articles in this special report on upgrading focus on Canada's oil and bitumen reserves, the promising technologies that upgrade them, and present details of some of the current upgrader projects. This article covers the following areas: Canada's heavy oils; Upgrading expands; Upgrading technologies; Test results; Regional upgraders; High-quality light product.

  19. TO: Business Managers and Research Administrators FROM: Joseph M. Gindhart, Director -Sponsored Projects Accounting

    E-Print Network [OSTI]

    Subramanian, Venkat

    on Sponsored Projects. The information noted below was developed from the following sources; Federal Circulars specifically justified and approved as part of the project activity. o Food provided to participants in formal

  20. Directors Advance EM Mission with Help from Rigorous Project Management Program

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – Nearly 160 EM employees maintain certifications from a project management program that helps them achieve successful outcomes in the Cold War cleanup.

  1. Description NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    0.00 B 1030 Award Inner (TF) Conductor Material Contract 0 12JAN11A 12JAN11A 100 0.00 B 1035 Award Inner (TF) Conductor Machining contract 0 14SEP11A 14SEP11A 100 0.00 B 1037 Award TF Lead Extensions 0 30AUG11A 30AUG11A 100 0.00 B 1038 Award Friction Stir Weld Contract 0 30AUG11A 30AUG11A 100 0.00 B FY

  2. TO: Business Managers and Research Administrators FROM: Joseph M. Gindhart, Director -Sponsored Projects Accounting

    E-Print Network [OSTI]

    Kroll, Kristen L.

    -supported activity or earned as a result of the award." Generally, the funding agencies allow the Principal it as an offset to future award amounts. Since the income is project related, the University is also required the use or rental of property acquired under a grant; and license fees and royalties on patents

  3. Department of Energy Names Director for Office of Indian Energy...

    Energy Savers [EERE]

    Department of Energy Names Director for Office of Indian Energy Policy and Makes Available 2 Million for Clean Energy Projects on Tribal Lands Department of Energy Names Director...

  4. Jefferson Lab's upgraded Free-Electron Laser produces first ligh...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Navy's goals and expectations and we expect no less from the upgraded FEL." The Free-Electron Laser upgrade project is funded by the Department of Defense's Office of...

  5. Energy Efficiency Upgrades

    SciTech Connect (OSTI)

    Roby Williams

    2012-03-29

    The energy efficiency upgrades project at Hardin County General Hospital did not include research nor was it a demonstration project. The project enabled the hospital to replace outdated systems with modern efficient models. Hardin County General Hospital is a 501c3, nonprofit hospital and the sole community provider for Hardin and Pope Counties of Illinois. This project provided much needed equipment and facility upgrades that would not have been possible through locally generated funding. Task 1 was a reroofing of the hospital. The hospital architect designed the replacement to increase the energy efficiency of the hospital roof/ceiling structure. Task 2 was replacement and installation of a new more efficient CT scanner for the hospital. Included in the project was replacement of HVAC equipment for the entire radiological suite. Task 5 was a replacement and installation of a new higher capacity diesel-fueled emergency generator for the hospital replacing a 50+ year old gas-fired generator. Task 7 was the replacement of 50+ year-old walk-in cooler/freezer with a newer, energy efficient model. Task 8 was the replacement of 10+ year-old washing machines in the hospital laundry with higher capacity, energy efficient models. Task 9 was replacement of 50-year old single pane curtain window system with double-pane insulated windows. Additionally, insulation was added around ventilation systems and the curtain wall system.

  6. Calpine geothermal visitor center upgrade project An interactive approach to geothermal outreach and education at The Geysers

    E-Print Network [OSTI]

    Dobson, P.F.

    2014-01-01

    of enhanced geothermal systems (EGS) on the United States inof the Northwest Geysers EGS demon- stration project.hanced Geothermal Systems (EGS), induced seismicity Abstract

  7. Wanapum Dam Advanced Hydro Turbine Upgrade Project: Part 2 - Evaluation of Fish Passage Test Results Using Computational Fluid Dynamics

    SciTech Connect (OSTI)

    Dresser, Thomas J.; Dotson, Curtis L.; Fisher, Richard K.; Graf, Michael J.; Richmond, Marshall C.; Rakowski, Cynthia L.; Carlson, Thomas J.; Mathur, Dilip; Heisey, Paul G.

    2007-10-10

    This paper, the second part of a 2 part paper, discusses the use of Computational Fluid Dynamics (CFD) to gain further insight into the results of fish release testing conducted to evaluate the modifications made to upgrade Unit 8 at Wanapum Dam. Part 1 discusses the testing procedures and fish passage survival. Grant PUD is working with Voith Siemens Hydro (VSH) and the Pacific Northwest National Laboratory (PNNL) of DOE and Normandeau Associates in this evaluation. VSH has prepared the geometry for the CFD analysis corresponding to the four operating conditions tested with Unit 9, and the 5 operating conditions tested with Unit 8. Both VSH and PNNL have conducting CFD simulations of the turbine intakes, stay vanes, wicket gates, turbine blades and draft tube of the units. Primary objectives of the analyses were: • determine estimates of where the inserted fish passed the turbine components • determine the characteristics of the flow field along the paths calculated for pressure, velocity gradients and acceleration associated with fish sized bodies • determine the velocity gradients at the structures where fish to structure interaction is predicted. • correlate the estimated fish location of passage with observed injuries • correlate the calculated pressure and acceleration with the information recorded with the sensor fish • utilize the results of the analysis to further interpret the results of the testing. This paper discusses the results of the CFD analyses made to assist the interpretation of the fish test results.

  8. Safety analysis report for packaging upgrade plan

    SciTech Connect (OSTI)

    Kelly, D.L.

    1998-03-12

    This SARP Upgrade Plan reflects a revised SARP upgrade schedule based on the most current program needs. A performance agreement has been assigned, beginning in FY 1997, to update, revise, and/or cancel 20 percent of the existing onsite SARPS, so that 100 percent are reviewed and within current standards by the completion of the Project Hanford Management Contract (five-year period).

  9. Director's Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory ofDid you not find what you were lookingAboutDirector DirectorDirector's

  10. Laura Clayton Director of Administration

    E-Print Network [OSTI]

    Applebaum, David

    Laura Clayton Director of Administration (Arts & Humanities) Jane Elderton Academic Services Powell Project Officer (CompLit; English) Stephanie Mannion Programme Administrator (Communications & Partnerships) (E&IS; French; German; SPLAS) Tom Horne Programme Administrator (Learning & Teaching) (E

  11. APS Upgrade: Meetings, Workshops & Reviews | Advanced Photon...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    dynamics across length scales - in real time, in 3-D, in a single experiment. At the heart of the APS Upgrade Project planning process is the development of a robust science...

  12. Message from Hugh Montgomery: Assistant Director | Jefferson...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    with resource management and to support the Deputy Director for Science & Technology with strategic planning efforts. Allison will continue to treat her role as Deputy Project...

  13. TO: Procurement Directors FROM: Director, Policy Division

    Broader source: Energy.gov (indexed) [DOE]

    4 DATE: April 7, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT:...

  14. TO: Procurement Directors FROM: Director, Policy Division

    Energy Savers [EERE]

    POLICY FLASH 2011-56 DATE: March 16, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance...

  15. Safety analysis report for packaging upgrade plan

    SciTech Connect (OSTI)

    KELLY, D.L.

    1998-11-18

    This Safety Analysis Report for Packaging (SARP) Upgrade Plan reflects a revised SARP upgrade schedule based on the most current program needs. A Project Hanford Management Contract (PHMC) Performance Expectation exists to update, revise, and/or cancel seven onsite SARPS during FY 1999. It is the U.S. Department of Energy's desire that 100% of the SARPs (which existed at the beginning of the PHMC Contract) be upgraded, revised, and/or canceled by the end of the five year contract. This plan is a ''living'' document and is used as a management tool.

  16. Safety analysis report for packaging upgrade plan

    SciTech Connect (OSTI)

    Kelly, D.L., Westinghouse Hanford

    1996-12-09

    This Safety Analysis Report for Packaging (SARP) Upgrade Plan reflects a SARP upgrade schedule based on the most current program needs. A performance agreement has been assigned, beginning in FY 1997, to update, revise, and/or cancel 20 percent of the existing onsite SARPS, so that 100 percent are reviewed and within current standards by the completion of the Project Hanford Management Contract (five-year period).

  17. Director Videos

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation Current HAB PacketDiesel pricesCenter at Cornell Director Héctor D.Home

  18. Director's Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation Current HAB PacketDiesel pricesCenter at CornellDirector's Office Print

  19. Directorate Staff

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation Current HAB PacketDiesel pricesCenter at CornellDirector's

  20. Hydropower Advancement Project (HAP): Audits and Feasibility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Upgrades Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades 64hapornlsmith.ppt More Documents & Publications 2014...

  1. Assoc. Director for Programs

    E-Print Network [OSTI]

    . Director for RH Operations Building Managers Operations and Events Coor. (2) Event Services Coordinator Assistant Director for RH Operations Information Center Attendants Game Room Attendants Fiscal Assistant for Facilities Athletic Training Director Business Manager Maintenance Supervisor Maintenance Workers Assist. Dir

  2. Hydrocarbonaceous material upgrading method

    DOE Patents [OSTI]

    Brecher, Lee E.; Mones, Charles G.; Guffey, Frank D.

    2015-06-02

    A hydrocarbonaceous material upgrading method may involve a novel combination of heating, vaporizing and chemically reacting hydrocarbonaceous feedstock that is substantially unpumpable at pipeline conditions, and condensation of vapors yielded thereby, in order to upgrade that feedstock to a hydrocarbonaceous material condensate that meets crude oil pipeline specification.

  3. National Compact Stellarator Experiment Project Closeout Report PROJECT CLOSEOUT REPORT

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Approved by Jeffrey Makiel DOE Federal Project Director for the National Compact Stellarator Experiment II.....................................................................................1 3. PROJECT HISTORY

  4. NSLS control system upgrade

    SciTech Connect (OSTI)

    Smith, J.D.; Ramamoorthy, S.; Tang, Yong N.

    1995-12-31

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans.

  5. Preparation for upgrading western subbituminous coal

    SciTech Connect (OSTI)

    Grimes, R.W.; Cha, C.Y.; Sheesley, D.C.

    1990-11-01

    The objective of this project was to establish the physical and chemical characteristics of western coal and determine the best preparation technologies for upgrading this resource. Western coal was characterized as an abundant, easily mineable, clean, low-sulfur coal with low heating value, high moisture, susceptibility to spontaneous ignition, and considerable transit distances from major markets. Project support was provided by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The research was conducted by the Western Research Institute, (WRI) in Laramie, Wyoming. The project scope of work required the completion of four tasks: (1) project planning, (2) literature searches and verbal contacts with consumers and producers of western coal, (3) selection of the best technologies to upgrade western coal, and (4) identification of research needed to develop the best technologies for upgrading western coals. The results of this research suggest that thermal drying is the best technology for upgrading western coals. There is a significant need for further research in areas involving physical and chemical stabilization of the dried coal product. Excessive particle-size degradation and resulting dustiness, moisture reabsorption, and high susceptibility to spontaneous combustion are key areas requiring further research. Improved testing methods for the determination of equilibrium moisture and susceptibility to spontaneous ignition under various ambient conditions are recommended.

  6. Energy Upgrade California

    Broader source: Energy.gov [DOE]

    The Energy Upgrade California program serves as a one-stop shop for California homeowners who want to improve the energy efficiency of their homes. The program connects homeowners with qualified...

  7. Award-winning film director to discuss technical photography...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Atomic Bomb Photography and the EG&G Film Project Award-winning film director to discuss technical photography during atmospheric testing years Peter Kuran will discuss Edgerton,...

  8. Modern hydrocracking is the key to upgrading processes

    SciTech Connect (OSTI)

    Corbett, R.A.

    1989-06-26

    Hydrocracking technology is the key to Canada's heavy oil and bitumen upgrading facilities that have recently started or are due to start up during the next few years. The upgrader at Consumers' Cooperative Refineries Ltd. in Regina Sask.; the capacity addition program (CAP) at Syncrude Canada Ltd.'s Fort McMurray, Alta., plant; Husky Oil Operations Ltd.'s Bi-Provincial upgrader to be built near Lloydminster, Sask.; and the OSLO project to be built near Fort McMurray, all rely on this modern technology for primary upgrading. All of the projects are designed to upgrade heavy oil and bitumen extracted from oil sands to a high-quality synthetic crude oil (SCO) that is a blend of high-quality naphtha and gas oil.

  9. Designation of Federal Project Director and Deputy Federal Project Director

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would like submit theCovalent BondingMeeting |Design Competitions Designthe 29for Brookhaven

  10. COCONUT Deliverable D13 Upgraded State of the Art

    E-Print Network [OSTI]

    Schichl, Hermann

    COCONUT Deliverable D13 Upgraded State of the Art Techniques Implemented as Modules July 29, 2003.g., useful in the COCONUT project for organizing points, where some of the properties change from work node

  11. Principal Associate Director - Capital Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservation of Fe(II) by Carbon-Rich Matrices in HydrothermalMagneticAiter

  12. Project Development and Finance: Capabilities (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-01-01

    Capabilities overview of NREL's Project Finance and Development Group within the Deployment and Market Transformation Directorate.

  13. PARTNERSHIPS DIRECTORATE PEOPLE TECHNOLOGY EVENTS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DIRECTORATE PEOPLE TECHNOLOGY EVENTS (continued on page 8) (continued on page 3) Rogers, Thompson Named New Directors The ORNL Partnerships Directorate seeks to foster economic...

  14. Finance Director Beki Thomson

    E-Print Network [OSTI]

    Brierley, Andrew

    Andy Goor Finance Director Beki Thomson Deputy Director of Finance Operations Eric Gillespie Finance Operations Manager Accounts Payable Karen Laing Supervisor Laura McArthur Finance Assistant VACANCY Finance Assistant Sarah Milne Finance Assistant Julie Smith Finance Assistant Karina Thomson

  15. Biochemical upgrading of oils

    DOE Patents [OSTI]

    Premuzic, Eugene T. (East Moriches, NY); Lin, Mow S. (Rocky Point, NY)

    1999-01-12

    A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing in organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed.

  16. Biochemical upgrading of oils

    DOE Patents [OSTI]

    Premuzic, E.T.; Lin, M.S.

    1999-01-12

    A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed. 121 figs.

  17. ISIS upgrades David Findlay

    E-Print Network [OSTI]

    McDonald, Kirk

    ISIS upgrades David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC Proton Accelerators for Science and Innovation, 12­14 January 2012, FNAL #12;2 ISIS World for research in the physical and life sciences National and international community of >2000 scientists -- ISIS

  18. Energy Efficiency Through Lighting Upgrades

    SciTech Connect (OSTI)

    Kara Berst; Maria Howeth

    2010-06-01

    Lighting upgrades including neon to LED, incandescent to CFL's and T-12 to T-8 and T-5's were completed through this grant. A total of 16 Chickasaw nation facilities decreased their carbon footprint because of these grant funds. Calculations used were based on comparing the energy usage from the previous year�¢����s average and the current energy usage. For facilities without a full year's set of energy bills, the month after installation was compared to the same month from the previous year. Overall, the effect the lighting change-outs had for the gaming centers and casinos far exceeded expectations. For the Madill Gaming Center; both an interior and exterior upgrade was performed which resulted in a 31% decrease in energy consumption. This same reduction was seen in every facility that participated in the grant. Just by simply changing out light bulbs to newer energy efficient equivalents, a decrease in energy usage can be achieved and this was validated by the return on investment seen at Chickasaw Nation facilities. Along with the technical project tasks were awareness sessions presented at Chickasaw Head Starts. The positive message of environmental stewardship was passed down to head start students and passed along to Chickasaw employees. Excitement was created in those that learned what they could do to help reduce their energy bills and many followed through and took the idea home. For a fairy low cost, the general public can also use this technique to lower their energy consumption both at home and at work. Although the idea behind the project was somewhat simple, true benefits have been gained through environmental awareness and reductions of energy costs.

  19. Superconducting RF Lab Facility Upgrades at Los Alamos

    SciTech Connect (OSTI)

    Katonak, D.J.; Rusnak, B.

    1999-03-01

    Research and testing of multi-cell superconducting cavities demands extensive contamination control resources to achieve high-cavity fields. Facility upgrades at Los Alamos National Laboratory (LANL) included the modernization of test equipment, expanding and modernizing cleanroom facilities, improving safety, and expanding the high-pressure rinse cleaning process equipment. Each upgrade was integrated into the facility to enable users to assemble prototype cryomodules. The scope of the upgrades, the new installed capability, and budget and schedule for certain aspects of the project are discussed in this paper.

  20. Testing of FMI's Coal Upgrading Process

    SciTech Connect (OSTI)

    Vijay Sethi

    2009-03-21

    WRI and FMI have collaborated to develop and test a novel coal upgrading technology. Proprietary coal upgrading technology is a fluidized bed-based continuous process which allows high through-puts, reducing the coal processing costs. Processing is carried out under controlled oxidizing conditions at mild enough conditions that compared to other coal upgrading technologies; the produced water is not as difficult to treat. All the energy required for coal drying and upgrading is derived from the coal itself. Under the auspices of the Jointly Sponsored Research Program, Cooperative Agreement DE-FC26-98FT40323, a nominal 400 lbs/hour PDU was constructed and operated. Over the course of this project, several low-rank coals were successfully tested in the PDU. In all cases, a higher Btu, low moisture content, stable product was produced and subsequently analyzed. Stack emissions were monitored and produced water samples were analyzed. Product stability was established by performing moisture readsorption testing. Product pyrophobicity was demonstrated by instrumenting a coal pile.

  1. Power Systems Past Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    loop and its six associated substations. An upgrade of the INL loop, designed by Power Systems personnel, was completed in 1997. This project consists of transmission line...

  2. CRYOGENICS IN BEPCII UPGRADE.

    SciTech Connect (OSTI)

    JIA,L.; WANG,L.; LI,S.

    2002-07-22

    THIS PAPER PRESENTS A CRYOGENIC DESIGN FOR UPGRADING THE BEIJING ELECTRON POSITRON COLLIDER AT THE INSTITUTE OF HIGH ENERGY PHYSICS IN BEIJING. THE UPGRADE INVOLVES 3 NEW SUPERCONDUCTING FACILITIES, THE INTERACTION REGION QUADRUPOLE MAGNETS, THE DETECTOR SOLENOID MAGNETS AND THE SRF CAVITIES. FOR COOLING OF THESE DEVICES, A NEW CRYPLANT WITH A TOTAL CAPACITY OF 1.0KW AT 4.5K IS TO BE BUILT AT IHEP. AN INTEGRATED CRYOGENIC DESIGN TO FIT THE BEPCII CRYOGENIC LOADS WITH HIGH EFFICIENCY IS CARRIEDOUT USING COMPUTATIONAL PROCESS ANALYSIS SOFTWARE WITH THE EMPHASES ON ECONOMICS AND SAFETY IN BOTH CONSTRUCTION AND OPERATION OF THE PLANT. THIS PAPER DESCRIBES THE CRYOGENIC CHARACTERISTICS OF EACH SUPERCONDUCTING DEVICE, THEIR COOLING SCHEMES AND THE OVERALL CRYOPLANT.

  3. SLHC, the High-Luminosity Upgrade (public event)

    ScienceCinema (OSTI)

    None

    2011-10-06

    In the morning of June 23rd a public event is organised in CERN's Council Chamber with the aim of providing the particle physics community with up-to-date information about the strategy for the LHC luminosity upgrade and to describe the current status of preparation work. The presentations will provide an overview of the various accelerator sub-projects, the LHC physics prospects and the upgrade plans of ATLAS and CMS. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the LHC High Luminosity Upgrade project. Informing the public is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

  4. Environmental Assessment and Finding of No Significant Impact: Wastewater Treatment Capability Upgrade, Project NO. 96-D-122 Pantex Plant Amarillo, Texas

    SciTech Connect (OSTI)

    N /A

    1999-05-27

    This Environmental Assessment (EA) addresses the U.S. Department of Energy (DOE) proposed action regarding an upgrade of the Pantex Plant Wastewater Treatment Facility (WWTF). Potential environmental consequences associated with the proposed action and alternative actions are provided. DOE proposes to design, build, and operate a new WWTF, consistent with the requirements of Title 30 of the Texas Administrative Code (TAC), Chapter 317, ''Design Criteria for Sewage Systems,'' capable of supporting current and future wastewater treatment requirements of the Plant. Wastewater treatment at Pantex must provide sufficient operational flexibility to meet Pantex Plant's anticipated future needs, including potential Plant mission changes, alternative effluent uses, and wastewater discharge permit requirements. Treated wastewater effluent and non-regulated water maybe used for irrigation on DOE-owned agricultural land. Five factors support the need for DOE action: (1) The current WWTF operation has the potential for inconsistent permit compliance. (2) The existing WWTF lies completely within the 100-year floodplain. (3) The Pantex Plant mission has the potential to change, requiring infrastructure changes to the facility. (4) The life expectancy of the existing facility would be nearing its end by the time a new facility is constructed. (5) The treated wastewater effluent and non-regulated water would have a beneficial agricultural use through irrigation. Evaluation during the internal scoping led to the conclusion that the following factors are present and of concern at the proposed action site on Pantex Plant: (1) Periodic wastewater effluent permit exceedances; (2) Wetlands protection and floodplain management; (3) Capability of the existing facility to meet anticipated future needs of Pantex (4) Existing facility design life; and (5) Use of treated wastewater effluent and non-regulated water for irrigation. Evaluation during the internal scoping led to the conclusion that the following conditions are not present, nor of concern at the proposed site on Pantex Plant, and no further analysis was conducted: (1) State or national parks, forests, or other conservation areas; (2) Wild and scenic rivers; (3) Natural resources, such as timber, range, soils, minerals; (4) Properties of historic, archeological, or architectural significance; (5) Native American concerns; (6) Minority and low-income populations; and (7) Prime or unique farmland. In this document, DOE describes the proposed action and a reasonable range of alternatives to the proposed action, including the ''No-Action'' alternative. The proposed action cited in the ''U.S. Department of Energy Application for a Texas Pollutant Discharge Elimination System Permit Modifying Permit to Dispose of Waste, No. 02296,'' December 1998, included the construction of a new wastewater treatment facility, a new irrigation storage pond, and the conversion of the current wastewater treatment facility into an irrigation storage pond. Although a permit modification application has been filed, if a decision on this EA necessitates it, an amendment to the permit application would be made. The permit application would be required for any of the alternatives and the filing does not preclude or predetermine selection of an alternative considered by this EA. This permit change would allow Pantex to land-dispose treated wastewater by irrigating agricultural land. This construction for the proposed action would include designing two new lagoons for wastewater treatment. One of the lagoons could function as a facultative lagoon for treatment of wastewater. The second lagoon would serve as an irrigation storage impoundment (storage pond), with the alternative use as a facultative lagoon if the first lagoon is out of service for any reason. The new facultative lagoon and irrigation water storage pond would be sited outside of the 100-year flood plain. The existing WWTF lagoon would be used as a storage pond for treated wastewater effluent for irrigation water, as needed. The two new lagoons would be li

  5. Project Management Lessons Learned

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-08-05

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and aids the federal project directors and integrated project teams in the execution of projects.

  6. Jefferson Lab Directorate

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    with Lab stakeholders. Director's Office Leadership Council Public Affairs Office Science Education Office Staff Services 12000 Jefferson Avenue, Newport News, VA 23606 Phone:...

  7. Common Industrial Lighting Upgrade Technologies

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    is used to regulate the ongoing electricity provided to the lamp. COMMON INDUSTRIAL LIGHTING UPGRADE TECHNOLOGIES Due to the phase-out of the incandescent bulb and magnetic...

  8. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 DATE: May 30, 2014 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and...

  9. TO: Procurement Directors/Contracting Officers FROM: Director

    Broader source: Energy.gov (indexed) [DOE]

    4 DATE: July 7, 2014 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and...

  10. Energy and Environmental Sciences Directorate

    E-Print Network [OSTI]

    , Director Energy and Transportation Science Division Johney Green, Director Environmental Sciences Division1 4/2/2015 Energy and Environmental Sciences Directorate *Dual-administered with Computing Pierce Climate Change Research Jay Gulledge Biological Systems Science Tony Palumbo Energy Programs

  11. Upgraded Coal Interest Group

    SciTech Connect (OSTI)

    Evan Hughes

    2009-01-08

    The Upgraded Coal Interest Group (UCIG) is an EPRI 'users group' that focuses on clean, low-cost options for coal-based power generation. The UCIG covers topics that involve (1) pre-combustion processes, (2) co-firing systems and fuels, and (3) reburn using coal-derived or biomass-derived fuels. The UCIG mission is to preserve and expand the economic use of coal for energy. By reducing the fuel costs and environmental impacts of coal-fired power generation, existing units become more cost effective and thus new units utilizing advanced combustion technologies are more likely to be coal-fired.

  12. Finance Director Beki Thomson

    E-Print Network [OSTI]

    Brierley, Andrew

    Andy Goor Finance Director Beki Thomson Deputy Director of Finance Operations Eric Gillespie Finance Operations Manager Accounts Payable Karen Laing Supervisor VACANCY Finance Assistant VACANCY Finance Assistant Sarah Milne Finance Assistant Julie Smith (0.6) Finance Assistant Karina Thomson Finance

  13. Generating Demand for Multifamily Building Upgrades | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demand for Multifamily Building Upgrades Generating Demand for Multifamily Building Upgrades Better Buildings Residential Network Peer Exchange Call Series: Generating Demand for...

  14. Generating Demand for Multifamily Building Upgrades | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Generating Demand for Multifamily Building Upgrades Generating Demand for Multifamily Building Upgrades Better Buildings Residential Network Peer Exchange Call Series: Generating...

  15. Webinar: "Upgrading Renewable and Sustainable Carbohydrates for...

    Energy Savers [EERE]

    "Upgrading Renewable and Sustainable Carbohydrates for the Production of High Energy Density Fuels" Webinar: "Upgrading Renewable and Sustainable Carbohydrates for the Production...

  16. Energy Efficiency Upgrades Help Build Better Neighborhoods |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods May 6, 2013 - 4:55pm Addthis In neighborhoods all across the...

  17. Generating Demand for Multifamily Building Upgrades | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Generating Demand for Multifamily Building Upgrades Generating Demand for Multifamily Building Upgrades May 14, 2015 12:30PM to 2:00PM EDT Learn more...

  18. Sponsored by: National Association of Energy Service Companies Financing An Energy Upgrade

    E-Print Network [OSTI]

    Sponsored by: National Association of Energy Service Companies Financing An Energy Upgrade. Fortunately, the ability to finance energy projects using outside funding has increased over the past decade. Louis. A decade ago, not many traditional financial institutions really wanted to finance energy upgrade

  19. Laboratory Director Stewart Prager heralds start of new era with...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Director Stewart Prager heralds start of new era with NSTX-U and looks to future projects in "State of the Laboratory" address By Jeanne Jackson DeVoe October 13, 2015...

  20. Laboratory Director Stewart Prager heralds start of new era with...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Director Stewart Prager heralds start of new era with NSTX-U and looks to future projects in "State of the Laboratory" address By Jeanne Jackson DeVoe October 28, 2015...

  1. GRADUATE HANDBOOK Graduate Director

    E-Print Network [OSTI]

    GRADUATE HANDBOOK Graduate Director Environment & Sustainability Program University of South.environ.sc.edu #12;Environment and Sustainability Program Table of Contents 1. INTRODUCTION..............................................................................................................................1 2. MASTER OF EARTH & ENVIRONMENTAL RESOURCES MANAGEMENT (MEERM

  2. Thomas Reddinger Director, Steam

    E-Print Network [OSTI]

    McConnell, Terry

    Thomas Reddinger Director, Steam Operations Steven Richards Assistant Manager of Maintenance & Operations Tim Winterfield Operations Supervisor (Distribution) Deborah Moorhead Office Coordinator III Jacob Donovan- ColinSteam Plant Operator Vincent Massara Steam Plant Operator SU Steam Station/Chilled Water

  3. Cross-Functional Project Teams Real Estate

    E-Print Network [OSTI]

    Kamat, Vineet R.

    Cross-Functional Project Teams · Planning · Real Estate · Programming · Architectural Design Director Hospital Design & Construction Real Estate Jerry Schulte Associate Director Construction & Design Projects (Design & Construction) · Real Estate & Leasing · Property Management · GIS/Space Info · Design

  4. Esprit Project 20716 Generic Upgradable Architecture

    E-Print Network [OSTI]

    Firenze, Università degli Studi di

    - Pisa Dependable Computing Centre Consorzio Pisa Ricerche Analytical Modelling and Evaluation del CNR, Via S. Maria 36, 56126 Pisa, Italy a.bondavalli@cnuce.cnr.it ** Dept. Information Engineering, University of Pisa, Via Diotisalvi 2, Pisa, Italy mura@iet.unipi.it *** PDCC - Consorzio Pisa Ricerche

  5. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    -NBI-Control & Instm 5 08JUN10A 08JUN10A 14JUN10A 14JUN10A 0 0.00 100 0.00 0.00 2475-0004 FMEA Analysis

  6. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    01JUN10A 0 0.00 100 0.00 0.00 1000-0008 Fault, FMEA evaluation and analyses 21 03MAY10A 03MAY10A 0110A 25FEB11 18MAY11 -58 147 18,651.56 75 13,823.15 18,430.86 1000-0017 Fault, FMEA analyses (LOE) 220

  7. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    , bellows and organ pipes; the fabrication of Center Stack support legs; the procurementJAN14 06JAN14 0 51 904,627.54 139,894.87 167,190.11 1307-1010 Complete CAD Detail & Assy Drawings & Assy Drawings (Final) 48* 01FEB11* 31MAR11A 07APR11 07JUN11 -42 126 29,478.76 50 14,739.38 29

  8. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    (top and bottom) 6 04JAN13 04JAN13 11JAN13 11JAN13 0 161 40,466.88 0.00 0.00 8250-113 Support lower support structure 4 14JAN13 14JAN13 17JAN13 17JAN13 0 161 26,977.92 0.00 0.00 8250-117 lift old pedestal 5 22JAN13 22JAN13 28JAN13 28JAN13 0 212 20,392.80 0.00 0.00 8250-122 Purchase passive plate bolts

  9. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    element includes refurbishment of a TFTR NBI and its relocation to the NSTX test cell. Included in this WBS element are the activities necessary to refurbish a TFTR Neutral Beam beamline for use on NSTX. This scope includes replacing copper impinged parts as required and refurbishment of the seals, thermocouple

  10. Better Buildings Neighborhood Program Data Upgrade Projects ...

    Energy Savers [EERE]

    Fact 859 February 9, 2015 Excess Supply is the Most Recent Event to Affect Crude Oil Prices - Dataset Fact 889: September 7, 2015 Average Diesel Price Lower than Gasoline for...

  11. Critical Nuclear Utilities Upgrade Project (CNUUP) (4572)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would like submit theCovalent Bonding in Actinide SandwichCray era Craycourse-inventoryCritical

  12. Cyclotron Institute Upgrade Project - Facilities - Cyclotron Institute

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory of raregovAboutRecoveryplanningCoalSocialFrameworksNOW TAKING APPLICATIONS

  13. Fermilab Project Oversight Model Director Associate Lab Director

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journal Article) | SciTech Connect LargeSubmit a Question

  14. Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT PROJECT NEGATHERM.S. Project Manager Linda Spiegel Office Manager Energy Generation Research Laurie ten Hope Deputy Director Energy Research and Development Robert Oglesby Executive Director DISCLAIMER This report was prepared

  15. Using QECBs for Street Lighting Upgrades: Lighting the Way to Lower Energy Bills in San Diego

    Broader source: Energy.gov [DOE]

    Summarizes how the City of San Diego leveraged $13.1 million in qualified energy conservation bonds to increase the size of a street lighting upgrade project. Author: Lawrence Berkeley National Laboratory

  16. IPNS upgrade: A feasibility study

    SciTech Connect (OSTI)

    1995-04-01

    Many of Argonne National Laboratory`s (ANL`s) scientific staff members were very active in R&D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R&D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL`s Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately.

  17. LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES | Department...

    Energy Savers [EERE]

    LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES Faced with the challenge of...

  18. Spotlight on Austin, Texas: Best Offer Ever Produces Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Upgrades in Record Time Spotlight on Austin, Texas: Best Offer Ever Produces Upgrades in Record Time Spotlight on Austin, Texas: Best Offer Ever Produces Upgrades in Record Time,...

  19. Director's Fellowships | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Director's Fellow is hired as an Argonne Scholar with full benefits and a competitive salary. Director's Fellowships can be renewed annually for up to two years. The deadline for...

  20. Nuclear Science & Engineering Directorate

    E-Print Network [OSTI]

    , solar energy works well, but if the missions require long periods on the dark side of a planet or need and Reactor Operations Isotope Production and Research Materials Science Neutron Scattering #12;6 ManagedNuclear Science & Engineering Directorate NSED Performance Report February 2012 #12;2 Managed by UT

  1. CUSTOMERS OF EXECUTIVE DIRECTOR

    E-Print Network [OSTI]

    this unique role to better explore some of the tradeoffs between renewable and clean hydro power production, 2004 Via e-mail and U.S. Mail Mark Walker Director of Public Affairs Northwest Power & Conservation of Northwest Utilities on the Council's Draft 5th Power Plan Dear Mark, Industrial Customers of Northwest

  2. Status of TMX upgrade diagnostics construction

    SciTech Connect (OSTI)

    Hornady, R.S.; Davis, J.C.; Simonen, T.C.

    1981-07-20

    This report describes the status of the initial TMX Upgrade diagnostics and the state of development of additional diagnostics being prepared for later TMX Upgrade experiments. The initial diagnostic instrument set has been described in the TMX Upgrade Proposal. This set is required to get TMX Upgrade operational and to evaluate its initial performance. Additional diagnostic instruments are needed to then carry out the more detailed experiments outlined by the TMX Upgrade program milestones. The relation of these new measurements to the physics program is described in The TMX Upgrade Program Plan.

  3. U.S. Department of Energy Acquisition Strategy Guide for Capital Assets Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-07-22

    This Guide serves as a tool for federal project directors developing a project acquisition strategy document. No cancellation.

  4. Chris Banks Director of Library

    E-Print Network [OSTI]

    Chris Banks Director of Library Services Frances Boyle Assistant Director Library Academic Services Assistant to the Library Leadership Team Susan Howard Assistant Director Library Resource and Innovation Chart 1 Library Leadership Team Ruth Newton Staff Resource Coordinator (0.6 fte) Level 3b #12;Chris

  5. Earth System Modeling -- Director`s initiative. LDRD Program final report

    SciTech Connect (OSTI)

    MacCracken, M.; Penner, J. [Lawrence Livermore National Lab., CA (United States). Atmospheric Science Div.

    1996-06-01

    The objective of the Earth System Modeling Director`s Initiative is to develop and test a framework for interactively coupling subsystem models that represent the physical, chemical, and biological processes which determine the state of the atmosphere, ocean, land surface and vegetation. Most studies of the potential for human perturbations of the climate system made previously have treated only limited components of the Earth system. The purpose of this project was to demonstrate the capability of coupling all relevant components in a flexible framework that will permit a wide variety of tests to be conducted to assure realistic interactions. A representation of the Earth system is shown and its important interactions.

  6. 2014 Awards for Project Management | Department of Energy

    Energy Savers [EERE]

    4 Awards for Project Management 2014 Awards for Project Management Federal Project Director of the Year for 2014: Pepin Carolan (Office of Science) Secretary's Award of Excellence:...

  7. 2012 Awards for Project Management | Department of Energy

    Energy Savers [EERE]

    2 Awards for Project Management 2012 Awards for Project Management Federal Project Director of the Year for 2012 Mr. Hannibal Joma The 2012 Secretary Achievement Award The Office...

  8. 2013 Awards for Project Management | Department of Energy

    Energy Savers [EERE]

    3 Awards for Project Management 2013 Awards for Project Management Federal Project Director of the Year for 2013: Everett Trollinger (National Nuclear Security Administration)...

  9. Renewable Energy & Energy Efficiency Projects: Loan Guarantee...

    Broader source: Energy.gov (indexed) [DOE]

    Plenary III: Project Finance and Investment Renewable Energy & Energy Efficiency Projects: Loan Guarantee Solicitation Valri Lightner, Assistant Director, Technical Division at...

  10. Project Transition/Closeout (CD-4)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-24

    This Guide is written for the federal project director ensuring that processes progress smoothly and that projects meet asset management goals and financial closure requirements of DOE.

  11. Current Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    A FeedbackShare Page 12 GeV Upgrade Project Link to Website External link Technology Engineering Development Facility Project .pdf file (29KB) Utilities Infrastructure...

  12. EFITviewer UpgradesEFITviewer Upgrades MDSplus Event Management System

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Summation System. red values indicate an alarm condition. #12;Web Tool Upgrades · Different Signals may is automatic · Signal names saved in a file may be pasted into Web Tool fields · "Memory" of previous entries improved #12;#12;#12;Web Tools can overlay profiles #12;

  13. CEBAF Upgrade: Cryomodule Performance And Lessons Learned

    SciTech Connect (OSTI)

    Drury, Michael A.; Davis, G. Kirk; Hogan, John P.; Hovater, J. Curt; King, Lawrence; Marhauser, Frank; Park, HyeKyoung; Preble, Joe; Reece, Charles E.; Rimmer, Robert A.; Wang, Haipeng; Wiseman, Mark A.

    2014-02-01

    The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

  14. Automatic Software Upgrades for Distributed Systems

    E-Print Network [OSTI]

    Ajmani, Sameer

    2005-11-30

    Upgrading the software of long-lived, highly-available distributed systems is difficult. It is not possible to upgrade all the nodes in a system at once, since some nodes may be unavailable and halting the system for an ...

  15. Automatic Software Upgrades for Distributed Systems

    E-Print Network [OSTI]

    Ajmani, Sameer

    2005-10-06

    Upgrading the software of long-lived, highly-available distributedsystems is difficult. It is not possible to upgrade all the nodes in asystem at once, since some nodes may be unavailable and halting thesystem for an ...

  16. Quality Control, Standardization of Upgrades, and Workforce Expectatio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Control, Standardization of Upgrades, and Workforce Expectations Quality Control, Standardization of Upgrades, and Workforce Expectations Better Buildings Residential...

  17. Bioenergy Technologies Office R&D Pathways: Algal Lipid Upgrading...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Upgrading More Documents & Publications Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway Pathways for Algal Biofuels Bioenergy Technologies Office...

  18. CONSTRUCTION ALERT Deans, Directors, Chairpersons, Building Coordinators, Faculty & Staff, KOKUA

    E-Print Network [OSTI]

    CONSTRUCTION ALERT TO: Deans, Directors, Chairpersons, Building Coordinators, Faculty & Staff OF PROJECT: Early morning on November 18, 2011 HOURS OF CONSTRUCTION: The Contractor is allowed to work from persons in the vicinity of this construction project are advised to respect all construction barricades

  19. Current Positions: Director Oil, Gas, & Mining, Vecron Lordstock Group (VLG)

    E-Print Network [OSTI]

    Boolchand, Punit

    Current Positions: Director Oil, Gas, & Mining, Vecron Lordstock Group (VLG) VLG is a global high and Project challenges. VLG provides core services: 1. Structured Project finance, 2. Structured Trade finance. Standard Oil of Ohio Publications, Presentations, Review Chapters, and Patents: 37 issued US Patents

  20. The TCS Upgrade Impurity Control

    E-Print Network [OSTI]

    Washington at Seattle, University of

    field ne is the plasma density RMF is the RMF rotation frequency rs is the FRC's separatrix radius, A.Tankut, G.C. Vlases Redmond Plasma Physics Laboratory, University of Washington RPPL, University of the TCS upgrade #12;FRCs at RPPL · FRC's have potential to make near ideal reactor - linear, high beta

  1. From the Director

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journal Article)Forthcoming UpgradesArea: PADD 1 to PADD 2 FromFrom the

  2. Department of Energy Guide for Project Execution Plans

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-12

    This directive provides guidance for the federal project director to produce a useful and flexible plan. No cancellation.

  3. Project Title: Vault Type Room Upgrade Project (4543)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeedingProgramExemptions |(Conference) |l)etermlnationlJetermlnatIont'orn1

  4. Recent Upgrade of the Klystron Modulator at SLAC

    SciTech Connect (OSTI)

    Nguyen, M.N.; Burkhart, C.P.; Lam, B.K.; Morris, B.; /SLAC

    2011-11-04

    The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 {mu}S at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 {mu}S at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

  5. Acquisition Executive Associate Director for

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Acquisition Executive Associate Director for Fusion Energy Sciences E. Synakowski DOE Program Offi NSTX Program Manager Fusion Energy Sciences B. Sullivan Office DOE Site Office DOE Site Manager

  6. Mark Reeves Associate Director, Commercialization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    programs in bioremediation of hazardous environmental chemicals and biomimeticsbiomaterials. From 1995 through 1998, he was the Director of the Laboratory's Bioprocessing...

  7. UPGRADING METHANE USING ULTRA-FAST THERMAL SWING ADSORPTION

    SciTech Connect (OSTI)

    Anna Lee Tonkovich

    2004-01-01

    The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the feasibility of upgrading low-Btu methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys' modular microchannel process technology. The project is on schedule and under budget. For Task 1.1, the open literature, patent information, and vendor contacts were surveyed to identify adsorbent candidates for experimental validation and subsequent demonstration in an MPT-based ultra-fast TSA separation for methane upgrading. The leading candidates for preferential adsorption of methane over nitrogen are highly microporous carbons. A Molecular Gate{trademark} zeolite from Engelhard Corporation has emerged as a candidate. For Task 1.2, experimental evaluation of adsorbents was initiated, and data were collected on carbon (MGN-101) from PICA, Inc. This carbon demonstrated a preferential capacity for methane over nitrogen, as well as a reasonable thermal swing differential capacity for a 90% methane and 10% nitrogen mixture. A similar methane swing capacity at 2 psig was measured. The mixture composition is relevant because gob gas contains nearly 85% methane and must be purified to 97% methane for pipeline quality.

  8. 18 September, 2012 TO: Alan Townsend, Division Director, and Penny Firth, Deputy Division Director, NSF Division

    E-Print Network [OSTI]

    Wall, Diana

    18 September, 2012 TO: Alan Townsend, Division Director, and Penny Firth, Deputy Division Director, Deputy Assistant Director, Directorate for Biological Sciences Dear Alan and Penny, We were very pleased

  9. Fernald Environmental Management Project Director's Final Findings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    guidelines and deadlines for neutralizationremoval of the hazardous waste in the uranyl nitrate hexahydrate (UNH) System Parties DOE; Fernald Environmental Restoration...

  10. Fernald Environmental Management Project Director's Final Findings...

    Office of Environmental Management (EM)

    to these Orders certifies that he or she is fully authorized to enter into the terms and conditions of these Orders and to legally bind such signatory to this document. Go...

  11. Designation of Environmental Management Federal Project Director...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current Effective Date: Mar 08, 2011 Re-delegation Allowed: No Authorities: DOE O 361.1B DOE O 413.3B Related History Related to: DOE O 361.1B, Acquisition Career Management...

  12. Designation of Environmental Management Federal Project Director...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current Effective Date: Feb 11, 2011 Re-delegation Allowed: No Authorities: DOE O 413.3B, DOE O 361.1B Related History Related to: DOE O 361.1B, Acquisition Career Management...

  13. Paul Glowaski: Garden Director, Homeless Garden Project

    E-Print Network [OSTI]

    Reti, Irene H.

    2010-01-01

    do this rooftop farming gig. Paul Glowaski Paul and AlisonI’m going to need a side gig, to try and bring in a little

  14. Fernald Environmental Management Project Director's Final Findings...

    Office of Environmental Management (EM)

    Agreement Type Compliance Order Legal Driver(s) CERCLA Scope Summary Integrate the groundwater monitoring activities required by OAC rules with the site-wide RIFS groundwater...

  15. Paul Glowaski: Garden Director, Homeless Garden Project

    E-Print Network [OSTI]

    Reti, Irene H.

    2010-01-01

    to find work. They moved to Detroit from—they were livinggot married, they moved, like I said, to Detroit. Mybecame a bus driver in Detroit in the fifties, I guess. He

  16. Paul Glowaski: Garden Director, Homeless Garden Project

    E-Print Network [OSTI]

    Reti, Irene H.

    2010-01-01

    was this kid moving from Vermont. I’m sure I was coming fromGlowaski: Literally, and I’m no better off. I loved Vermont.Vermont is amazing. It’s just so nice, and everybody is

  17. Fernald Environmental Management Project Director's Findings...

    Office of Environmental Management (EM)

    Run (April 30, 1987), detailed plans and a permit to install application for a stormwater retention system (October 1, 1987), a contingency plan describing actions to...

  18. Fernald Environmental Management Project Director's Final Findings...

    Office of Environmental Management (EM)

    of Ohio Environmental Protection Agency 0.0. Box 163669,180O WaterMark Dr. dumbus, Ohio 43216-3669 ' 644-3020 .X (614) 644-2329 December 27. 1994 Re: U.S. Department of Energy...

  19. Portsmouth Decommissioning and Decontamination Project Director's Final

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergyPresidential PermitDAYS - WEReportingMemorandumensures compliance

  20. Computing and Computational Sciences Directorate - Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory of raregovAboutRecoveryplanningCoalSocial media isHome › About Us News

  1. The FNAL Injector Upgrade Status

    SciTech Connect (OSTI)

    Tan, C.Y.; Bollinger, D.S.; Duel, K.L.; Karns, P.R.; Lackey, J.R.; Pellico, W.A; Scarpine, V.E.; Tomlin, R.E.; /Fermilab

    2012-05-14

    The new FNAL H{sup -} injector upgrade is currently being tested before installation in the Spring 2012 shutdown of the accelerator complex. This line consists of an H{sup -} source, low energy beam transport (LEBT), 200 MHz RFQ and medium energy beam transport (MEBT). Beam measurements have been performed to validate the design before installation. The results of the beam measurements are presented in this paper.

  2. Director's Commentary: Why Seeds?

    E-Print Network [OSTI]

    Lee, Rachel

    2013-01-01

    genetically and corporate infrastructures, environmental pol- modified) seeds. Indeed, the project builds on two lutants, foodways, and food

  3. Kansas Advanced Semiconductor Project

    SciTech Connect (OSTI)

    Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

    2007-09-21

    KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

  4. Superbend upgrade of the Advanced Light Source

    SciTech Connect (OSTI)

    Robin, D.; Krupnick, J.; Schlueter, R.; Steier, C.; Marks, S.; Wang, B.; Zbasnik, J.; Benjegerdes, R.; Biocca, A.; Bish, P.; Brown, W.; Byrne, W.; Chen, J.; Decking, W.; DeVries, J.; DeMarco, W.R.; Fahmie, M.; Geyer, A.; Harkins, J.; Henderson, T.; Hinkson, J.; Hoyer, E.; Hull, D.; Jacobson, S.; McDonald, J.; Molinari, P.; Mueller, R.; Nadolski, L.; Nishimura, H.; Nishimura, K.; Ottens, F.; Paterson, J.A.; Pipersky, P.; Portmann, G.; Richie, A.; Rossi, S.; Salvant, B.; Scarvie, T.; Schmidt,A.; Spring, J.; Taylor, C.; Thur, W.; Timossi, C.; Wandesforde, A.

    2004-05-26

    The Advanced Light Source (ALS) is a third generation synchrotron light source located at Lawrence Berkeley National Laboratory (LBNL). There was an increasing demand at the ALS for additional high brightness hard x-ray beamlines in the 7 to 40 keV range. In response to that demand, the ALS storage ring was modified in August 2001. Three 1.3 Tesla normal conducting bending magnets were removed and replaced with three 5 Tesla superconducting magnets (Superbends). The radiation produced by these Superbends is an order of magnitude higher in photon brightness and flux at 12 keV than that of the 1.3 Tesla bends, making them excellent sources of hard x-rays for protein crystallography and other hard x-ray applications. At the same time the Superbends did not compromise the performance of the facility in the VUV and soft x-ray regions of the spectrum. The Superbends will eventually feed 12 new beamlines greatly enhancing the facility's capability and capacity in the hard x-ray region. The Superbend project is the biggest upgrade to the ALS storage ring since it was commissioned in 1993. In this paper we present an overview of the Superbend project, its challenges and the resulting impact on the ALS.

  5. MICHIGAN SWEEPS NEIGHBORHOODS WITH ENERGY UPGRADES | Department...

    Energy Savers [EERE]

    on supporting local businesses and employment. BetterBuildings for Michigan developed a sustainable market for energy efficiency upgrades and thousands of qualified professionals...

  6. Physics Motivation for NSTXPhysics Motivation for NSTX UpgradeUpgrade Jon Menard and Masa Ono

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Physics Motivation for NSTXPhysics Motivation for NSTX UpgradeUpgrade Jon Menard and Masa Ono NSTX CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep U Quebec #12;NSTXNSTX Physics Motivation ARIES-ST #12;NSTXNSTX Physics Motivation for NSTX Upgrade 3Fall 2009 NSTX Research Priorities: · Full

  7. Physics design of the NSTX UpgradePhysics design of the NSTX Upgrade Jon Menard, PPPL

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    engineering design of the upgrade, systematic free-boundary equilibrium calculations have been performedPhysics design of the NSTX UpgradePhysics design of the NSTX Upgrade Jon Menard, PPPL NSTX Program Dominion U ORNL PPPL PSI Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado

  8. 2011 Awards for Project Management | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The Federal Project Director of the Year for 2011: David K. Arakawa (Office of Science) The Secretary's Award of Excellence: Physical Sciences Facility Project (Office of Science)...

  9. CONSTRUCTION NOTICE Deans, Directors, Chairpersons, Building Coordinators, Faculty & Staff, KOKUA

    E-Print Network [OSTI]

    CONSTRUCTION NOTICE New Notice TO: Deans, Directors, Chairpersons, Building Coordinators, Faculty, 2011 to August 15, 2011 HOURS OF CONSTRUCTION: Monday to Friday 7:30 a.m. to 4:00 p.m. ACCESSIBLE of this construction project are advised to respect all construction barricades and all posted safety/detour signs

  10. CONSTRUCTION NOTICE Deans, Directors, Chairpersons, Building Coordinators, Faculty & Staff, KOKUA

    E-Print Network [OSTI]

    CONSTRUCTION NOTICE New Notice TO: Deans, Directors, Chairpersons, Building Coordinators, Faculty, 2011 HOURS OF CONSTRUCTION: Monday to Friday 7:30 a.m. to 4:00 p.m. ACCESSIBLE ROUTES: Parking of area. ADVISORY: All persons in the vicinity of this construction project are advised to respect all

  11. Analysis Efforts Supporting NSTX Upgrades

    SciTech Connect (OSTI)

    H.Zhang, P. Titus, P. Rogoff, A.Zolfaghari, D. Mangra, M. Smith

    2010-11-29

    The National Spherical Torus Experiment (NSTX) is a low aspect ratio, spherical torus (ST) configuration device which is located at Princeton Plasma Physics Laboratory (PPPL) This device is presently being updated to enhance its physics by doubling the TF field to 1 Tesla and increasing the plasma current to 2 Mega-amperes. The upgrades include a replacement of the centerstack and addition of a second neutral beam. The upgrade analyses have two missions. The first is to support design of new components, principally the centerstack, the second is to qualify existing NSTX components for higher loads, which will increase by a factor of four. Cost efficiency was a design goal for new equipment qualification, and reanalysis of the existing components. Showing that older components can sustain the increased loads has been a challenging effort in which designs had to be developed that would limit loading on weaker components, and would minimize the extent of modifications needed. Two areas representing this effort have been chosen to describe in more details: analysis of the current distribution in the new TF inner legs, and, second, analysis of the out-of-plane support of the existing TF outer legs.

  12. Potential Peak Load Reductions From Residential Energy Efficient Upgrades 

    E-Print Network [OSTI]

    Meisegeier, D.; Howes, M.; King, D.; Hall, J.

    2002-01-01

    the potential peak load reductions from residential energy efficiency upgrades in hot and humid climates. First, a baseline scenario is established. Then, the demand and consumption impacts of individual upgrade measures are assessed. Several of these upgrades...

  13. MAST-Upgrade Advancing compact fusion sources

    E-Print Network [OSTI]

    MAST-Upgrade Advancing compact fusion sources #12;#12;The Mega Amp Spherical Tokamak (MAST) is the centrepiece of the UK's fusion research programme. It has led studies into the spherical tokamak, a compact to the drive towards commercial fusion power. 1. Testing reactor concepts. MAST-Upgrade will be the first

  14. SQL Server 2014 Upgrade Technical Guide

    E-Print Network [OSTI]

    Chaudhuri, Surajit

    SQL Server 2014 Upgrade Technical Guide Writers: Ron Talmage, Richard Waymire, James Miller, Vivek, Larry Barnes, Pablo Ahumada Published: December 2014 Applies to: SQL Server 2014 Summary: This technical guide takes you through the essentials for upgrading SQL Server 2005, SQL Server 2008, and SQL Server

  15. Energy solutions?Director Eric Isaacs

    ScienceCinema (OSTI)

    Eric ISaacs

    2013-06-05

    Argonne's Director Eric Isaacs talks about the laboratory's efforts for creating new, clean energy solutions.

  16. Chinese House JOHN YIN, Faculty Director

    E-Print Network [OSTI]

    Hayden, Nancy J.

    1 Chinese House JOHN YIN, Faculty Director YING HU, Faculty Director KEVIN NEVILLE, Student Director JASON RANCIATO, Student Director OVERVIEW The Chinese House has been a Living and Learning Center for students who are learning Chinese language and are interested in Chinese culture. It is also a place where

  17. Director for Hartford Center of Gerontological

    E-Print Network [OSTI]

    Chapman, Michael S.

    Director for Pediatric Nurse Practitioner Margaret Scharf Program Director for Psychiatric Mental HealthPat Berry Director for Hartford Center of Gerontological Nursing Excellence Carol Howe Program Director for Nurse Midwifery Amy Goltz Associate Dean for Finance and Administration Susan Bakewell

  18. Energy solutions—Director Eric Isaacs

    SciTech Connect (OSTI)

    Eric ISaacs

    2012-08-08

    Argonne's Director Eric Isaacs talks about the laboratory's efforts for creating new, clean energy solutions.

  19. Upgrading of Sergiev Posad department of Moscow NPO Radon

    SciTech Connect (OSTI)

    Debieve, Pierre [BELGATOM, Avenue Ariane 4, B 1200 Brussels (Belgium); Delecaut, Gregory; Vanleeuw, Daniel [Institut National des Radioelements - IRE, 6220 Fleurus (Belgium)

    2007-07-01

    Available in abstract form only. Full text of publication follows: BELGATOM and IRE Consortium has been awarded by the European Commission end of 2005 to conduct a project entitled 'Upgrading of Sergiev Posad Department of Moscow NPO Radon and the assessment of the radiological impact in the area nearby'. The main aims to achieve in the frame of this Europe-aid Project are: - Improvement of the performance and the safety level of the present radwaste management system, taking into account the additional waste expected from the Kurchatov Institute rehabilitation and from the forecast decommissioning of Research Reactors on the territory of Moscow. - Basic design and assistance for the procurement of upgrading equipment related to: - radwaste sorting and pretreatment - replacement of the hydraulic system of the existing super-compactor - characterisation system for radwaste 'Support for preparing the PSAR and PEIAR for new licensing' Assessment of the radiological impact in an area of 50 km radius around Sergiev Posad Department. - The initial duration of this Project is 3 years, starting beginning of 2006. This paper describes the difficulties encountered to start and implement the Project and its status at the half of the planned time schedule. (authors)

  20. CONSORTIUM GETS WISE ABOUT ENERGY UPGRADES | Department of Energy

    Energy Savers [EERE]

    upgrade rebates through their utility, and the programs would provide an additional rebate for upgrades that achieved more than 15% energy savings. In Charleston, South...

  1. Shared Space vs. In-Unit Upgrades in Multifamily Buildings |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Shared Space vs. In-Unit Upgrades in Multifamily Buildings Shared Space vs. In-Unit Upgrades in Multifamily Buildings Better Buildings Neighborhood Program Multifamily Peer...

  2. Federal Finance Facilities Available for Energy Efficiency Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy...

  3. Energy Efficiency Upgrades Help Retired Military Officers Save...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficiency Upgrades Help Retired Military Officers Save Money Energy Efficiency Upgrades Help Retired Military Officers Save Money May 7, 2013 - 12:50pm Addthis A retirement...

  4. EECBG Success Story: Energy Efficiency Upgrades Part of Winning...

    Energy Savers [EERE]

    Energy Efficiency Upgrades Part of Winning Formula for Oregon School District EECBG Success Story: Energy Efficiency Upgrades Part of Winning Formula for Oregon School District...

  5. Capturing Energy Upgrades in the Real Estate Transaction | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Capturing Energy Upgrades in the Real Estate Transaction Capturing Energy Upgrades in the Real Estate Transaction Because green building techniques and products may impact the...

  6. Phoenix Overcomes Barriers and Energizes Homeowners to Make Upgrades...

    Office of Environmental Management (EM)

    Phoenix Overcomes Barriers and Energizes Homeowners to Make Upgrades Phoenix Overcomes Barriers and Energizes Homeowners to Make Upgrades A photo of a residence. Energize Phoenix...

  7. Better Buildings Neighborhood Initiative Upgrades 100,000 Buildings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Buildings Neighborhood Initiative Upgrades 100,000 Buildings, Saves 730 Million on Energy Bills Better Buildings Neighborhood Initiative Upgrades 100,000 Buildings, Saves...

  8. Progress on ARRA-funded Facility & Capability Upgrades for the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ARRA-funded Facility & Capability Upgrades for the Battery AbuseSafety Laboratory Progress on ARRA-funded Facility & Capability Upgrades for the Battery AbuseSafety Laboratory...

  9. Computation Directorate 2007 Annual Report

    SciTech Connect (OSTI)

    Henson, V E; Guse, J A

    2008-03-06

    If there is a single word that both characterized 2007 and dominated the thoughts and actions of many Laboratory employees throughout the year, it is transition. Transition refers to the major shift that took place on October 1, when the University of California relinquished management responsibility for Lawrence Livermore National Laboratory (LLNL), and Lawrence Livermore National Security, LLC (LLNS), became the new Laboratory management contractor for the Department of Energy's (DOE's) National Nuclear Security Administration (NNSA). In the 55 years under the University of California, LLNL amassed an extraordinary record of significant accomplishments, clever inventions, and momentous contributions in the service of protecting the nation. This legacy provides the new organization with a built-in history, a tradition of excellence, and a solid set of core competencies from which to build the future. I am proud to note that in the nearly seven years I have had the privilege of leading the Computation Directorate, our talented and dedicated staff has made far-reaching contributions to the legacy and tradition we passed on to LLNS. Our place among the world's leaders in high-performance computing, algorithmic research and development, applications, and information technology (IT) services and support is solid. I am especially gratified to report that through all the transition turmoil, and it has been considerable, the Computation Directorate continues to produce remarkable achievements. Our most important asset--the talented, skilled, and creative people who work in Computation--has continued a long-standing Laboratory tradition of delivering cutting-edge science even in the face of adversity. The scope of those achievements is breathtaking, and in 2007, our accomplishments span an amazing range of topics. From making an important contribution to a Nobel Prize-winning effort to creating tools that can detect malicious codes embedded in commercial software; from expanding BlueGene/L, the world's most powerful computer, by 60% and using it to capture the most prestigious prize in the field of computing, to helping create an automated control system for the National Ignition Facility (NIF) that monitors and adjusts more than 60,000 control and diagnostic points; from creating a microarray probe that rapidly detects virulent high-threat organisms, natural or bioterrorist in origin, to replacing large numbers of physical computer servers with small numbers of virtual servers, reducing operating expense by 60%, the people in Computation have been at the center of weighty projects whose impacts are felt across the Laboratory and the DOE community. The accomplishments I just mentioned, and another two dozen or so, make up the stories contained in this report. While they form an exceptionally diverse set of projects and topics, it is what they have in common that excites me. They share the characteristic of being central, often crucial, to the mission-driven business of the Laboratory. Computational science has become fundamental to nearly every aspect of the Laboratory's approach to science and even to the conduct of administration. It is difficult to consider how we would proceed without computing, which occurs at all scales, from handheld and desktop computing to the systems controlling the instruments and mechanisms in the laboratories to the massively parallel supercomputers. The reasons for the dramatic increase in the importance of computing are manifest. Practical, fiscal, or political realities make the traditional approach to science, the cycle of theoretical analysis leading to experimental testing, leading to adjustment of theory, and so on, impossible, impractical, or forbidden. How, for example, can we understand the intricate relationship between human activity and weather and climate? We cannot test our hypotheses by experiment, which would require controlled use of the entire earth over centuries. It is only through extremely intricate, detailed computational simulation that we can test our theories, and simulati

  10. Los Alamos Dynamics Summer School Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Dynamics Summer School Projects and Resources Contact Institute Director Charles Farrar (505) 663-5330 Email Professional Staff Assistant Jutta Kayser (505) 663-5649 Email...

  11. Acquisition and Project Management Awards Presentations - Ingrid...

    Office of Environmental Management (EM)

    (e) Appearance (NOvA) Procurement Executive Award Office of Science Source Selection Evaluation Team (SSET) Federal Project Director of the Year Pepin Carolan Workshop 2015 -...

  12. Beam intensity upgrade at Fermilab

    SciTech Connect (OSTI)

    Marchionni, A.; /Fermilab

    2006-07-01

    The performance of the Fermilab proton accelerator complex is reviewed. The coming into operation of the NuMI neutrino line and the implementation of slip-stacking to increase the anti-proton production rate has pushed the total beam intensity in the Main Injector up to {approx} 3 x 10{sup 13} protons/pulse. A maximum beam power of 270 kW has been delivered on the NuMI target during the first year of operation. A plan is in place to increase it to 350 kW, in parallel with the operation of the Collider program. As more machines of the Fermilab complex become available with the termination of the Collider operation, a set of upgrades are being planned to reach first 700 kW and then 1.2 MW by reducing the Main Injector cycle time and by implementing proton stacking.

  13. Guidelines for Home Energy Professionals Project: Benefits for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    home. The Guidelines for Home Energy Professionals project fosters the growth of a high-quality residential energy upgrade market and a skilled, credentialed workforce. As a...

  14. Guidelines for Home Energy Professionals Project: Benefits for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Guidelines for Home Energy Professionals project fosters the growth of a high-quality residential energy upgrade market and a skilled, credentialed workforce. As a...

  15. Guidelines for Home Energy Professionals Project: Benefits for...

    Broader source: Energy.gov (indexed) [DOE]

    The Guidelines for Home Energy Professionals project fosters the growth of a high-quality residential energy upgrade market and a skilled, credentialed workforce. As a result,...

  16. Scientific Upgrades at the Oak Ridge National Laboratory High Flux Isotope Reactor

    SciTech Connect (OSTI)

    Selby, Douglas L [ORNL; Jones, Amy [ORNL; Crow, Lowell [ORNL

    2012-01-01

    The United States Department of Energy is sponsoring a number of projects that will provide scientific upgrades to the neutron science facilities associated with the High Flux Isotope Reactor (HFIR) located at Oak Ridge National Laboratory. Funding for the first upgrade project was initiated in 1996 and all presently identified upgrade projects are expected to be completed by the end of 2003. The upgrade projects include: (1) larger beam tubes, (2) a new monochromator drum for the HB-1 beam line, (3) a new HB-2 beam line system that includes one thermal guide and a new monochromator drum, (4) new instruments for the HB-2 beamline, (5) a new monochromator drum for the HB-3 beam line, (6) a supercritical hydrogen cold source system to be retrofitted into the HB-4 beam tube, (7) a 3.5 kW refrigeration system at 20 K to support the cold source and a new building to house it, (8) a new HB-4 beam line system composed of four cold neutron guides with various mirror coatings and associated shielding, (9) a number of new instruments for the cold beams including two new SANS instruments, and (10) construction of support buildings. This paper provides a short summary of these projects including their present status and schedule.

  17. Designation of Federal Project Director and Deputy Federal Project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current Effective Date: Jan 14, 2011 Re-delegation Allowed: No Authorities: DOE O 361.1B, DOE O 413.3B Related History Related to: DOE O 361.1B, Acquisition Career Management...

  18. D Metallurgical Project A. H. Compton, Project Director

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would like submit theCovalent Bonding inCustomer-Comments Sign InTAMUiv e in to L if e . ARAGf!

  19. SC Projects Perspective - Stephen Meador, Director, Office of Project

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterestedReplacement-2-A WholesaleRetrofitElectricalDepartment

  20. Support of US CLIVAR Project Office 2012

    SciTech Connect (OSTI)

    Cummings, Donna

    2013-11-21

    SUBJECT: CLOSEOUT OF AWARD NO DE-SC0008494 FINAL REPORT: SUPPORT OF US CLIVAR PROJECT OFFICE 2012 UNIVERSITY CORPORATION FOR ATMOSPHERIC RESEARCH Director of JOSS, supervised the U.S. CLIVAR Project Office Director and helped direct the officer to enhance the goals and objectives of the U.S. CLIVAR Project and budget. Financial Manager of JOSS, worked to complete proposals and monitor compliance with award requirements and funding limitations and ensure the U.S. CLIVAR Project Office complied with UCAR policies and procedures. Project Coordinator administered the funding for the U.S. CLIVAR Project Office and was responsible for coordinating special projects that required additional support from JOSS technical staff. These projects included activities such as website updates, technology upgrades, production of printed reports, and development of graphic elements like logos. Web Developer worked both on web development and graphic work and the work consisted of the following: Maintaining the site ? installing updates to Drupal CMS (Content Management System). Creating new templates for webpages and styling them with CSS and JavaScript/jQuery code. Fixing the styling on webpages that the content contributor/manager (Jenn Mays) created and has had trouble with. Creating new web forms for abstract uploading, subscriptions, and meeting registrations. Created 4 webpages for the ?ASP: Key Uncertainties in the Global Carbon-Cycle? meeting. Developed a document review form, instruction webpages, login redirect, dynamic table with form submissions for the US CLIVAR SSC Science Plan Document Review. This was open to the public from June 12, 2013 until July 10, 2013. During this time the user accounts had to be checked (daily) that were created by the public, to delete any spam ones. Graphics work: preparing images for general use on webpages, webpage banners, and for meeting name badges, creating a US CLIVAR letterhead, redesigning the US AMOC logo. System Administrator spent time working on the migration of the US CLIVAR site from the USGCRP office to UCAR here Boulder. This was done to increase the general speed of the site & to allow the web developer to work in it more efficiently. Main tasks were to Archive the old Site, create new development site for web developer, and move web address to new website when web developer was finished with development. There are no patients or equipment related to this proposals

  1. Jefferson Lab awards upgrade contracts (Inside Business) | Jefferson...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    https:www.jlab.orgnewsreleasesjefferson-lab-awards-upgrade-contracts Submitted: Friday, January 9...

  2. System and process for upgrading hydrocarbons

    SciTech Connect (OSTI)

    Bingham, Dennis N.; Klingler, Kerry M.; Smith, Joseph D.; Turner, Terry D.; Wilding, Bruce M.

    2015-08-25

    In one embodiment, a system for upgrading a hydrocarbon material may include a black wax upgrade subsystem and a molten salt gasification (MSG) subsystem. The black wax upgrade subsystem and the MSG subsystem may be located within a common pressure boundary, such as within a pressure vessel. Gaseous materials produced by the MSG subsystem may be used in the process carried out within the black wax upgrade subsystem. For example, hydrogen may pass through a gaseous transfer interface to interact with black wax feed material to hydrogenate such material during a cracking process. In one embodiment, the gaseous transfer interface may include one or more openings in a tube or conduit which is carrying the black wax material. A pressure differential may control the flow of hydrogen within the tube or conduit. Related methods are also disclosed.

  3. Improving the Software Upgrade Value Stream

    E-Print Network [OSTI]

    Ippolito, Brian

    This paper reports findings from a two-year study to identify Lean practices for deriving software requirements from aerospace system level requirements, with a goal towards improving the software upgrade value stream.

  4. Upgrade Your Refinery for Energy Conservation 

    E-Print Network [OSTI]

    Johnnie, D. H., Jr.; Klooster, H. J.

    1983-01-01

    Upgrading existing refineries for efficient energy utilization imposes strict restraints upon design engineers. Present and future production requirements must be defined. Reliable operating data must be obtained from historical records and test...

  5. Director's Fellowships | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation Current HAB PacketDiesel pricesCenter at Cornell DirectorDirector's

  6. D0 Silicon Upgrade: Upgrade Piping Loads on Cleanroom Roof

    SciTech Connect (OSTI)

    Sakla, Steve; /Fermilab

    1995-08-28

    The proposed piping layout for the DO upgrade will run along the south wall of DAB. The cryogenic service pipe runs above the upper and lower cleanroom roofs and will need to be supported by the roofs beams. Calculations were done to determine the stresses in the I-beams created by the existing and additional loads due to the upgrade. Refer to drawing no. 3823.115-ME-317283 for drawings of the piping layout. Figure 1 shows the 'plan view' portion of this drawing. The weight of the individual lines were calculated in figure 2 assuming a pipe density of O.28 lbm/in{sup 3} for stainless steel (0.12% C) and a fluid density (assuming LN2 at 1 atm) of 0.03 lbm/in{sup 3}. The weights of the corrugated steel flooring, assembly hall feed cans, support beams, and roof hatch were also included in the analysis. These loads are calculated on pgs. 5-6. A floor load of 50 lbf/ft{sup 2} was also added in order to maintain the existing floor load limit in addition to the added piping loads. Measurements of the dimensions of the I-beams determined that the nominal sizes of the beams were W8 x 21 for the lower roof and W14 x 26 for the upper roof. Pipe lengths were determined from the drawing for each of the lines on pgs. 1-2 of the calculations (refer to all piping by line numbers according to figure 2). A total weight was calculated for lines 3-9 along the south wall and lines 1-2 running along the north wall of the lower cleanroom roof. To simplify the calculations these weights were assumed to be evenly distributed on the 5 I-beam supports of the lower cleanroom roof 2.5 feet in from the south wall. The stress analysis was done using FrameMac, a 2-D finite element program for the Macintosh. Beam 3 was not included in the analysis because it is structurally equivalent to beam 1. The program outputted maximum values for shear stress, bending stress, shear force, and moments in each of the beams analyzed. These values were then compared to the allowable stresses as per the specifications and codes stated in the AISC: Manual of Steel Construction. The stresses on the roof beams needed to be determined in a number of different places. The first was in the beam itself which included the flange and web sections. The second place was at the ends of the beams where the flanges were removed to make the perpendicular connections to the other beams on the lower roof. The final point was the framed beam connection which included the bolt analysis. FrameMac calculated stresses only for the beams which included the sections where the flanges were removed to make the end connections. To analyze the connections, the allowable bending and shear stresses were solved for allowable shear and moments. This was done because FrameMac does not have the capability to analyze the dimensions for the bolts and angles used in the connections were known and the program outputted values for reaction forces and moments at the ends of the beams. Multiplying the allowable shear stress for the bolts and angle connections by their respective areas gave the allowable shear force. The allowable moment for the angle connection was calculated by multiplying the section modulus of the angle by the allowable bending stress. These allowable loads are calculated on pgs. 7-8. The allowable and maximum calculated stresses by FrameMac are summarized in a table. In conclusion, the cleanroom roofs will be able to safely support the weight of the upgrade cryogenic piping, feed cans, corrugated flooring and a 50 lbf/ft{sup 2} floor load with the addition of diagonal braces at the ends of beams 1,2,3,4, and 8. The location and size of these diagonal braces are shown in fig. 4. Also, the piping supports and feed cans will all need to be placed directly above the I-beam supports. These supports will consist of unistrut structures that will be detailed and specified separate to this analysis. The output and input data from FrameMac and the drawings used in the analysis follow the calculation pages.

  7. Revised August 2014 Assistant Director of

    E-Print Network [OSTI]

    Hutcheon, James M.

    programs. B. Student Learning & Curriculum Development: The Assistant Director of Residence Education is responsible for establishing a learning focused environment conducive to the academic success and personal on coaching Resident Directors. Utilize various theories of student development and learning, personal

  8. Proceedings Edited by: Karim Maredia, Program Director

    E-Print Network [OSTI]

    Isaacs, Rufus

    Proceedings Edited by: Karim Maredia, Program Director Dieudonné Baributsa, Program Associate Proceedings Edited by: Dr. Karim M. Maredia, Program Director Dr. Dieudonné N. Baributsa, Program Associate Pest Management Stakeholders Forum Sponsored by the USAID IPM-Collaborative Research Support Program

  9. HUTTON NAMED NMFS ASSOCIATE DIRECTOR

    E-Print Network [OSTI]

    for Resource Utilization, has been named Associate Director. His responsibilities embrace: economic Society of Heating, Refrigeration and Air Conditioning Engineers, and Th International Institute both sides. " orking meetmgs followed on Nov. 22-23 to summarize details for reports. The meeting

  10. Daniel Sperling Professor and Director

    E-Print Network [OSTI]

    California at Davis, University of

    of California, Davis and Board Member, California Air Resources Board Policy Institute for Energy, Environment, and Economy Sacramento, CA 21 May 2012 California's Transportation GHG Policy Model ...as seen by a policyDaniel Sperling Professor and Director Institute of Transportation Studies (ITS-Davis) University

  11. Toni L. Meier Director, Logistics Management Integration

    E-Print Network [OSTI]

    Toni L. Meier Director, Logistics Management Integration Department Naval Air Systems Command Ms. Meier is currently the Director, Logistics Management Integration Department. As the Director she is responsible for life cycle integrated logistics support of 3,900 Naval Aviation aircraft and weapons programs

  12. Moab Project Exceeds 5 Years of Operations Without Lost-Time...

    Energy Savers [EERE]

    "We cannot rest on our laurels; otherwise, we put our workers and project at risk," said Moab Federal Project Director Donald Metzler. The site's remedial action...

  13. U.S.-Russia MPC and A upgrades at the Beloyarsk Nuclear Power Plant

    SciTech Connect (OSTI)

    Saraev, O. [Beloyarsk Nuclear Power Plant, Zarechny (Russian Federation); Haase, M.; Smarto, C. [Dept. of Energy, Washington, DC (United States); Mikkelsen, K.; Heinberg, C. [Pacific Northwest National Labs., Richland, WA (United States); Showalter, R.; Soo Hoo, M. [Sandia National Labs., Albuquerque, NM (United States); Hatcher, C.; Forehand, M. [Los Alamos National Lab., NM (United States)

    1998-08-01

    During the January 1996 meeting of the Gore-Chernomyrdin Commission, the Beloyarsk Nuclear Power Plant (BNPP) was identified as one of the additional sites for cooperative projects on upgrading Materials Protection, Control and Accounting (MPC and A). Since June 1996, Sandia National Laboratories (SNL), Pacific Northwest National Laboratories (PNNL), and Los Alamos National Laboratory (LANL) have worked with BNPP to upgrade MPC and A at the facility. Some unique challenges were encountered because BNPP has an operating BN-600 600-Megawatt breeder reactor. SNL has been responsible for working with BNPP to implement physical protection upgrades to the Central Alarm Station, Fresh Fuel Storage building, Spent Fuel Storage Area, and Vehicle/Personnel Portal. In addition, improved communication equipment for the Ministry of the Interior (MVD) guards and training of personnel were provided. PNNL has been responsible for coordinating Material Control and Accounting (MC and A) upgrades at BNPP. PNNL, in conjunction with LANL, has implemented such MC and A upgrades as a computerized nuclear materials accounting system, training in MC and A elements, nondestructive assay instrumentation for fresh fuel, installation of a fork detector for measuring spent fuel, and installation of an underwater video camera for verification of spent fuel serial numbers.

  14. Statement of Charles G. Groat Director, U.S. Geological Survey, U.S. Depa...rce and Agency Organization, On The Yucca Mountain Project, April 5, 2005 Congressional Testimony, 2005

    E-Print Network [OSTI]

    's (DOE) Yucca Mountain Project. Let me emphasize from the outset how seriously USGS takes this situation longstanding and first-rate reputation for sound, objective science. On March 14, 2005, we learned from DOE of accuracy and credibility. Throughout the entire history of the Yucca Mountain Project USGS scientists have

  15. Level-2 Calorimeter Trigger Upgrade at CDF

    SciTech Connect (OSTI)

    Flanagan, G.U.; /Purdue U.

    2007-04-01

    The CDF Run II Level-2 calorimeter trigger is implemented in hardware and is based on an algorithm used in Run I. This system insured good performance at low luminosity obtained during the Tevatron Run II. However, as the Tevatron instantaneous luminosity increases, the limitations of the current system due to the algorithm start to become clear. In this paper, we will present an upgrade of the Level-2 calorimeter trigger system at CDF. The upgrade is based on the Pulsar board, a general purpose VME board developed at CDF and used for upgrading both the Level-2 tracking and the Level-2 global decision crate. This paper will describe the design, hardware and software implementation, as well as the advantages of this approach over the existing system.

  16. Director's Discretionary Research and Development Program: Annual Report, Fiscal Year 2006

    SciTech Connect (OSTI)

    Not Available

    2007-03-01

    The Director's Discretionary Research and Development Program, Annual Report Fiscal Year 2006 is an annual management report that summarizes research projects funded by the DDRD program. The NREL DDRD program comprises projects that strengthen NREL's four technical competencies: Integrated Systems, Renewable Electricity, Renewable Fuels, and Strategic Analysis.

  17. Energy Upgrade of the Siam Photon Source

    SciTech Connect (OSTI)

    Rugmai, S.; Rujirawat, S.; Hoyes, G. G.; Prawanta, S.; Kwankasem, A.; Siriwattanapitoon, S.; Suradet, N.; Pimol, P.; Junthong, N.; Boonsuya, S.; Janpuang, P.; Prawatsri, P.; Klysubun, P.

    2007-01-19

    The energy upgrade of the storage ring is part of the plans to develop x-ray production capability of the Siam Photon Source. Simulations have been carried out. The bending magnet power supply has been replaced. Energy of the injected 1 GeV beam from the injector is then ramped up 20% in the storage ring. Studies for modification of bending magnet poles have been done to evaluate possibility of further increasing the beam energy to 1.4 GeV in the future. Studies of the energy upgrade plan and details of energy ramping process, together with beam measurements are presented.

  18. STANDARDIZATION OF CEBAF 12 GEV UPGRADE CAVITY TESTING

    SciTech Connect (OSTI)

    Tiffany Bass, G. Davis, Christiana Wilson, Mircea Stirbet

    2012-07-01

    CEBAF 12GeV upgrade project includes 80 new 7-cell cavities to form 10 cryomodules. Each cavity underwent RF qualification at 2.07K using a high power accelerating gradient test and an HOM survey in Jefferson Lab's Vertical Testing Area (VTA) before cavity string assembly. In order to ensure consistently high quality data, updated cavity testing procedures and analysis were implemented and used by a group of VTA operators. For high power tests, a cavity testing procedure was developed and used in conjunction with a LabVIEW program to collect the test data. Additionally while the cavity was at 2.07K, an HOM survey was performed using a network analyzer and a combination of Excel and Mathematica programs. Data analysis was standardized and an online logbook, Pansophy, was used for data storage and mining. The Pansophy system allowed test results to be easily summarized and searchable across all cavity tests. In this presentation, the CEBAF 12GeV upgrade cavity testing procedure, method for data analysis, and results reporting results will be discussed.

  19. Living Comfortably: A Consumer's Guide to Home Energy Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Living Comfortably: A Consumer's Guide to Home Energy Upgrades Living Comfortably: A Consumer's Guide to Home Energy Upgrades March 7, 2013 - 3:15pm Addthis A weatherization worker...

  20. Sandia Lightning Early Warning Network: Digital-based upgrade

    SciTech Connect (OSTI)

    Boyd, G.M.

    1994-05-01

    This report describes the layout and operation of the recently upgraded Sandia Lightning Early Warning Network, which was upgraded from an analog-based to a digital-based telemetry system.

  1. Upgrading : an alternative approach towards housing reform in China

    E-Print Network [OSTI]

    He, Fang, 1956-

    1989-01-01

    The thesis is a study on urban housing upgrading in China. The main objective is to look at upgrading, which has been widely used in many developing countries, as an alternative approach to solving the existing urban housing ...

  2. Energy Savers: Your One Stop Shop for Energy Efficiency Upgrades...

    Office of Environmental Management (EM)

    Your One Stop Shop for Energy Efficiency Upgrades Energy Savers: Your One Stop Shop for Energy Efficiency Upgrades This is a presentation from Energy Impact Illinois posted on the...

  3. Spotlight on Austin, Texas: Best Offer Ever Produces 564 Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    564 Upgrades in Record Time Spotlight on Austin, Texas: Best Offer Ever Produces 564 Upgrades in Record Time This Better Buildings case study from April 2011 focuses on grantee...

  4. Automatic Software Upgrades for Distributed Systems (PhD thesis)

    E-Print Network [OSTI]

    Ajmani, Sameer

    2005-10-06

    Upgrading the software of long-lived, highly-available distributedsystems is difficult. It is not possible to upgrade all the nodes in asystem at once, since some nodes may be unavailable and halting thesystem for an ...

  5. Systems integration and upgrade of an Engineering Flight Simulator 

    E-Print Network [OSTI]

    Alcorn, William Pleasant

    2002-01-01

    This thesis presents the system integration and upgrade of the Texas A&M Flight Mechanics Laboratory Engineering Flight Simulator (EFS). This upgrade replaced the previous EFS, a simplistic design that did not resemble an aircraft cockpit...

  6. The JLAB 12 GeV Energy Upgrade of CEBAF

    SciTech Connect (OSTI)

    Harwood, Leigh H.

    2013-12-01

    This presentation should describe the progress of the 12GeV Upgrade of CEBAF at Jefferson Lab. The status of the upgrade should be presented as well as details on the construction, procurement, installation and commissioning of the magnet and SRF components of the upgrade.

  7. Heavy Oil Upgrading from Electron Beam (E-Beam) Irradiation 

    E-Print Network [OSTI]

    Yang, Daegil

    2011-02-22

    to upgrade. This thesis demonstrates that electron beam (E-Beam) heavy oil upgrading, which uses unique features of E-Beam irradiation, may be used to improve conventional heavy oil upgrading. E-Beam processing lowers the thermal energy requirements and could...

  8. CMS: Present status, limitations, and upgrade plans

    SciTech Connect (OSTI)

    Cheung, H.W.K.; /Fermilab; ,

    2011-09-01

    An overview of the CMS upgrade plans will be presented. A brief status of the CMS detector will be given, covering some of the issues we have so far experienced. This will be followed by an overview of the various CMS upgrades planned, covering the main motivations for them, and the various R&D efforts for the possibilities under study. The CMS detector has been working extremely well since the start of data-taking at the LHC as is evidenced by the numerous excellent results published by CMS and presented at this workshop and recent conferences. Less well documented are the various issues that have been encountered with the detector. In the spirit of this workshop I will cover some of these issues with particular emphasis on problems that motivate some of the upgrades to the CMS detector for this decade of data-taking. Though the CMS detector has been working extremely well and expectations are great for making the most of the LHC luminosity, there have been a number of issues encountered so far. Some of these have been described and while none currently presents a problem for physics performance, some of them are expected to become more problematic, especially at the highest Phase 1 luminosities for which the majority of the integrated luminosity will be collected. These motivate upgrades for various parts of the CMS detector so that the current excellent physics performance can be maintained or even surpassed in the realm of the highest Phase 1 luminosities.

  9. ELECTRONICS UPGRADE OF HIGH RESOLUTION MASS SPECTROMETERS

    SciTech Connect (OSTI)

    Mcintosh, J; Joe Cordaro, J

    2008-03-10

    High resolution mass spectrometers are specialized systems that allow researchers to determine the exact mass of samples to four significant digits by using magnetic and electronic sector mass analyzers. Many of the systems in use today at research laboratories and universities were designed and built more than two decades ago. The manufacturers of these systems have abandoned the support for some of the mass spectrometers and parts to power and control them have become scarce or obsolete. The Savannah River National Laboratory has been involved in the upgrade of the electronics and software for these legacy machines. The Electronics Upgrade of High Resolution Mass Spectrometers consists of assembling high-end commercial instrumentation from reputable manufacturers with a minimal amount of customization to replace the electronics for the older systems. By taking advantage of advances in instrumentation, precise magnet control can be achieved using high resolution current sources and continuous feedback from a high resolution hall-effect probe. The custom equipment include a precision voltage divider/summing amplifier chassis, high voltage power supply chassis and a chassis for controlling the voltage emission for the mass spectrometer source tube. The upgrade package is versatile enough to interface with valve control, vacuum and other instrumentation. Instrument communication is via a combination of Ethernet and traditional IEEE-488 GPIB protocols. The system software upgrades include precision control, feedback and spectral waveform analysis tools.

  10. MAST Upgrade Advancing compact fusion sources

    E-Print Network [OSTI]

    MAST Upgrade Advancing compact fusion sources 4 1 Off) is the centrepiece of the UK's fusion programme. MAST has led studies into the spherical tokamak, a compact fusion research: · Make the case for a fusion Component Test Facility. · Add to the knowledge base for ITER

  11. Recent advances in upgrading large pumps

    SciTech Connect (OSTI)

    Nolt, J.R. Jr.; Russell, G.J. [American Hydro Corp., York, PA (United States)

    1995-12-31

    The benefits of upgrading hydraulic turbines and pump/turbines via the installation of custom designed replacement runners has been well documented in recent years. The increased operating efficiency and capacity, and improved cavitation and operating characteristics of modern replacement runners bears strong testimony to the specialized design an manufacturing techniques developed by turbine manufacturers who specialize in the upgrade business. The integration of computerized design and manufacturing technologies has resulted in the production of turbine and pump/turbine runners with a quality level not approachable with traditional techniques. This same technology can have dramatic results when applied to the upgrade of large pumps. The energy utilized to operate large irrigation, storage and cooling water pumps represents a major cost to the owners of the pumps. The operation of a 25,000 horsepower pump through one irrigation season represents an energy cost of approximately $4,000,000 per year. An increase in efficiency of 2% could result in an energy cost savings of over $100,000 per year. Pump impellers are subject to cavitation and erosion damage which reduces pump efficiency and capacity and may require costly maintenance and repairs. When designed and manufactured using modern computerized methods, an upgraded impeller can operate cavitation free at higher capacities and efficiencies than the original design. The costs of pump operation and maintenance can be substantially reduced by the replacement of the impellers with impellers of modern, custom design.

  12. Structural analysis of fuel assembly clads for the Upgraded Transient Reactor Test Facility (TREAT Upgrade)

    SciTech Connect (OSTI)

    Ewing, T.F.; Wu, T.S.

    1986-01-01

    The Upgraded Transient Reactor Test Facility (TREAT Upgrade) is designed to test full-length, pre-irradiated fuel pins of the type used in large LMFBRs under accident conditions, such as severe transient overpower and loss-of-coolant accidents. In TREAT Upgrade, the central core region is to contain new fuel assemblies of higher fissile loadings to maximize the energy deposition to the test fuel. These fuel assemblies must withstand normal peak clad temperatures of 850/sup 0/C for hundreds of test transients. Due to high temperatures and gradients predicted in the clad, creep and plastic strain effects are significant, and the clad structural behavior cannot be analyzed by conventional linear techniques. Instead, the detailed elastic-plastic-creep behavior must be followed along the time-dependent load history. This paper presents details of the structural evaluations of the conceptual TREAT Upgrade fuel assembly clads.

  13. Guidelines for Home Energy Upgrade Professionals: Standard Work Specifications for Multifamily Energy Upgrades (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-08-01

    This fact sheet provides essential information about the 2011 publication of the Workforce Guidelines for Multifamily Home Energy Upgrades, including their origin, their development with the help of industry leaders to create the standard work specifications for retrofit work.

  14. Director of Classroom Classroom Facilities

    E-Print Network [OSTI]

    Ciocan-Fontanine, Ionut

    Standards Classroom Renovation/New Const Coord OCM Capital Projects Lead Classroom Facilities Project Coordination & Liaison CPPM Classroom Tech Design Classroom Tech Standards Classroom Tech/AV Repair & Install Classroom Tech Project Oversight AV Equip Support NTS - Tech Project Coordination Proj Capable Classroom

  15. Pressure Safety of JLAB 12GeV Upgrade Cryomodule

    SciTech Connect (OSTI)

    Cheng, Gary [JLAB; Wiseman, Mark A. [JLAB; Daly, Ed [JLAB

    2009-11-01

    This paper reviews pressure safety considerations, per the US Department of Energy (DOE) 10CFR851 Final Rule [1], which are being implemented during construction of the 100 Megavolt Cryomodule (C100 CM) for Jefferson Lab’s 12 GeV Upgrade Project. The C100 CM contains several essential subsystems that require pressure safety measures: piping in the supply and return end cans, piping in the thermal shield and the helium headers, the helium vessel assembly which includes high RRR niobium cavities, the end cans, and the vacuum vessel. Due to the vessel sizes and pressure ranges, applicable national consensus code rules are applied. When national consensus codes are not applicable, equivalent design and fabrication approaches are identified and implemented. Considerations for design, material qualification, fabrication, inspection and examination are summarized. In addition, JLAB’s methodologies for implementation of the 10 CFR 851 requirements are described.

  16. Battelle Columbus Laboratories Director's Final Findings and...

    Office of Environmental Management (EM)

    Name Battelle Columbus Laboratories Director's Final Findings and Orders, October 4, 1995 State Ohio Agreement Type Federal Facility Agreement Legal Driver(s) FFCAct Scope...

  17. Portsmouth Gaseous Diffusion Plant Director's Final Findings...

    Office of Environmental Management (EM)

    Portsmouth Gaseous Diffusion Plant Director's Final Findings and Orders, October 4, 1995 State Ohio Agreement Type Federal Facility Agreement Legal Driver(s) FFCAct Scope Summary...

  18. Fermilab Today | Director's Corner Archive | 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for management and performance, and Melanie Kenderdine, executive director for energy policy and systems analysis. During our meeting, Secretary Moniz elaborated on several of...

  19. Director's commitment to diversity recognized

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would like submit theCovalentLaboratory | National Nuclear SecurityDirector's colloquium

  20. New NERSC Director Sudip Dosanjh

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass map shinesSolarNew scholarship supports returningNew Mexico to MarsNewNERSC Director

  1. Director's Postdoctoral Fellowship | Careers | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation Current HAB PacketDiesel pricesCenter at CornellDirector's Office

  2. PNNL: About PNNL - Director's Message

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesseworkSURVEYI/O Streams forOrhan Kizilkaya,P.Federal LaboratoryDirector's

  3. Multifamily Projects

    Broader source: Energy.gov [DOE]

    Presents Energy Smart Colorado's approach to driving demand for multifamily residential energy efficiency upgrades.

  4. Overview of the physics and engineering design of NSTX upgrade

    SciTech Connect (OSTI)

    Menard, J. E. [Princeton Plasma Physics Laboratory (PPPL); Gerhardt, S. P. [Princeton Plasma Physics Laboratory (PPPL); Bell, M. [Princeton Plasma Physics Laboratory (PPPL); Bialek, J [Columbia University; Brooks, A. [Princeton Plasma Physics Laboratory (PPPL); Canik, John [ORNL; Chrzanowski, J. [Princeton Plasma Physics Laboratory (PPPL); Denault, M [Princeton Plasma Physics Laboratory (PPPL)

    2012-01-01

    The spherical tokamak (ST) is a leading candidate for a Fusion Nuclear Science Facility (FNSF) due to its compact size and modular configuration. The National Spherical Torus eXperiment (NSTX) is a MA-class ST facility in the US actively developing the physics basis for an ST-based FNSF. In plasma transport research, ST experiments exhibit a strong (nearly inverse) scaling of normalized confinement with collisionality, and if this trend holds at low collisionality, high fusion neutron fluences could be achievable in very compact ST devices. A major motivation for the NSTX Upgrade (NSTX-U) is to span the next factor of 3-6 reduction in collisionality. To achieve this collisionality reduction with equilibrated profiles, NSTX-U will double the toroidal field, plasma current, and NBI heating power and increase the pulse length from 1-1.5 s to 5-8 s. In the area of stability and advanced scenarios, plasmas with higher aspect ratio and elongation, high beta(N), and broad current profiles approaching those of an ST-based FNSF have been produced in NSTX using active control of the plasma beta and advanced resistive wall mode control. High non-inductive current fractions of 70% have been sustained for many current diffusion times, and the more tangential injection of the 2nd NBI of the Upgrade is projected to increase the NBI current drive by up to a factor of 2 and support 100% non-inductive operation. More tangential NBI injection is also projected to provide non-solenoidal current ramp-up as needed for an ST-based FNSF. In boundary physics, NSTX measures an inverse relationship between the scrape-off layer heat-flux width and plasma current that could unfavourably impact next-step devices. Recently, NSTX has successfully demonstrated substantial heat-flux reduction using a snowflake divertor configuration, and this type of divertor is incorporated in the NSTX-U design. The physics and engineering design supporting NSTX Upgrade is described.

  5. Catalytic Upgrading of Sugars Presentation for BETO 2015 Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    APPLICATIONS SOLVENT & HYDROXY- ACID POLYMERS CHELATING EXTRACTANT POLYMER ELECTROLYTES GREEN SOLVENTS, PHARMA FUEL ADDITIVE, LUBRICANTS Conducting catalysis R&D to build...

  6. NSTX Upgrade Project STRUCTURAL CALCULATION OF THE TF FLAG KEY

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    source of design information including computer program titles and revision levels.) 1] NSTX-CALC-13] NSTX Structural Design Criteria Document, I. Zatz [3] NSTX Design Point June 2010 http://www.pppl.gov/~neumeyer/NSTX_CSU/Design blade due to the OOP torque. 3.)The shear strength of the epoxy used to bond the CRES insert into the G

  7. J.R. Simplot: Burner Upgrade Project Improves Performance and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Saves Energy at a Large Food Processing Plant (September 2005) More Documents & Publications Steam System Efficiency Optimized After J.R. Simplot Fertilizer Plant...

  8. J.R. Simplot: Burner Upgrade Project Improves Performance and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in annual energy costs * Saves 52,000 MMBtu of natural gas annually * Improves boiler performance * Saves 526,000 kWh per year * Achieves a simple payback of less than 14...

  9. Biological Upgrading of Sugars Presentation for BETO 2015 Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hyd.- Fermentor Glucose utilization (total) 98% 80% 100% Lipid content 59% 60% 57% Volumetric productivity (gL-hr) at 72 h 0.05 (batch culture) 0.18 (batch culture) 0.29 (batch...

  10. Nuclear Materials Safeguards and Security Upgrade Project Completed Under

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesseworkSURVEY UNIVERSE The 2014 survey includes degreesRecoverySecurityBudget

  11. Janice C. Haith Director, Department of Navy

    E-Print Network [OSTI]

    Janice C. Haith Director, Department of Navy Deputy Chief Information Officer (Navy) (DDCIO (N)) Ms Haith became Director, Deputy Department of Navy Chief Information Officer (Navy) (formerly. In this position, she is responsible for all Chief Information Officer (CIO) matters related to the US Navy

  12. Africa House PATRICK BROWN, Faculty Director

    E-Print Network [OSTI]

    Hayden, Nancy J.

    Africa House PATRICK BROWN, Faculty Director LOKANGAKA LOSAMBE, Faculty Director PIERRETTE LUMUMBA of African cultures' role in the world. Africa House will be a valuable program in helping students develop component, Africa House offers students shared experiences as well as opportunities for participation

  13. Catherine Barrera Director of Research Administration

    E-Print Network [OSTI]

    Bustamante, Fabián E.

    Catherine Barrera Director of Research Administration c-barrera@northwestern.edu Tech L365 Phone-lueptow@northwestern.edu Tech L254 Phone: 847.491.3553 Elizabeth Tang Assistant Director of Research Administration e Associate Research Administrator, McC Admin, Federal Stimulus Funding, Baxter-NU Alliance, IUSSTF, Center

  14. Planning Organization & Logistics Deputy Director General

    E-Print Network [OSTI]

    Adin, Ron

    " Planning Organization & Logistics Deputy Director General Tel: 03 531 8553 : Fax: 03 535 4925 : P-O.Logistics@mail.biu.ac.il Bar-Ilan University, Ramat Gan 52900, Israel · www.6. , . , . #12; " Planning Organization & Logistics Deputy Director General Tel: 03 531 8553 : Fax: 03 535

  15. Upgrade of Fermilab/NICADD photoinjector laboratory

    SciTech Connect (OSTI)

    Piot, P.; Edwards, H.; /Fermilab; Huning, M.; /DESY; Li, J.; Tikhoplav, R.; /Rochester U.; Koeth, T.; /Rutgers U., Piscataway

    2005-05-01

    The Fermilab/NICADD photoinjector laboratory is a 16 MeV electron accelerator dedicated to beam dynamics and advanced accelerator physics studies. FNPL will soon be capable of operating at {approx} 40 MeV, after the installation of a high gradient TESLA cavity. In this paper we present the foreseen design for the upgraded facility along with its performance. We discuss the possibilities of using of FNPL as an injector for the superconducting module and test facility (SM&TF).

  16. NSTX Upgrade FDR Calculation Executive Summaries

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    performed to support the NSTX Upgrade design effort. Some, but not most, have been reviewed and signed.1.2 NSTXU-CALC-12-04-00 PF2 / PF3 Bolting, Bracket, and weld Stress P. Titus I.Zatz 1.1.2 NSTXU-CALC-12-05-00 PF4 and PF5 Support Analysis P. Titus I.Zatz 1.1.2 NSTXU-CALC-12-06-00 Aluminum Block (To Be Revised

  17. Steam-system upgrades | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing CapacityVectren) Jumpand MaintenanceStationary Power ServicesSte.upgrades

  18. NSTX-U Control System Upgrades

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Erickson, K. G.; Gates, D. A.; Gerhardt, S. P.; Lawson, J. E.; Mozulay, R.; Sichta, P.; Tchilinguirian, G. J.

    2014-06-01

    The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forward port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control.

  19. TO: Procurement Directors FROM: Director, Contract and Financial...

    Energy Savers [EERE]

    Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Class Deviation for Use of Clause 52.222-99, Establishing a Minimum Wage for Contractors...

  20. TO: Procurement Directors FROM: Director, Contract and Financial...

    Broader source: Energy.gov (indexed) [DOE]

    Assistance Policy Division Office of Acquisition and Project Management SUBJECT: Hurricane Sandy Contingency Operation -- Increase in Micro-Purchase and Simplified Acquisition...

  1. Richard Lazarus Named as Executive Director of National Commission...

    Energy Savers [EERE]

    Lazarus Named as Executive Director of National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling Richard Lazarus Named as Executive Director of National...

  2. BETO Deputy Director Publishes Commentary on Development of Algae...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BETO Deputy Director Publishes Commentary on Development of Algae as Renewable Energy Source BETO Deputy Director Publishes Commentary on Development of Algae as Renewable Energy...

  3. Jefferson Lab Selects Italian Physicist As Deputy Associate Director...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0Jefferson Lab Selects Italian Physicist As Deputy Associate Director for Nuclear Physics Cynthia Keppel Patrizia Rossi has been named deputy associate director for nuclear physics...

  4. New director of Jefferson Lab named (Daily Press) | Jefferson...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    https:www.jlab.orgnewsarticlesnew-director-jefferson-lab-named-daily-press New director of Jefferson Lab named Hugh Montgomery Hugh Montgomery has been named president of...

  5. New Director to lead Technology Development and Commercialization...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    New Director to lead Technology Development and Commercialization division April 2, 2015 Tweet EmailPrint Suresh Sunderrajan has been appointed Director of Argonne's Technology...

  6. Grace Bochenek Named New Director of DOE's National Energy Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grace Bochenek Named New Director of DOE's National Energy Technology Laboratory Grace Bochenek Named New Director of DOE's National Energy Technology Laboratory August 4, 2014 -...

  7. 1 1/28/2014 Physical Sciences Directorate

    E-Print Network [OSTI]

    , Manager Basic Energy Sciences Program Michelle Buchanan Chemical Sciences, Geosciences, and Biosciences, Director Materials Science and Technology Division Gene Ice, Director #12;

  8. Current Trends in Policy - What's new? - Berta Schreiber, Director...

    Office of Environmental Management (EM)

    Current Trends in Policy - What's new? - Berta Schreiber, Director, Office of Policy, OAPM Current Trends in Policy - What's new? - Berta Schreiber, Director, Office of Policy,...

  9. Statement from Ward Sproat on Yucca Mountain, Director of the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ward Sproat on Yucca Mountain, Director of the Office of Civilian Radioactive Waste Management Statement from Ward Sproat on Yucca Mountain, Director of the Office of Civilian...

  10. EERE Assistant Secretary and BETO Director Confirmed Speakers...

    Energy Savers [EERE]

    here Home EERE Assistant Secretary and BETO Director Confirmed Speakers for Algae Biomass Summit EERE Assistant Secretary and BETO Director Confirmed Speakers for Algae...

  11. Avoiding Distribution System Upgrade Costs Using Distributed Generation

    SciTech Connect (OSTI)

    Schienbein, Lawrence A.; Balducci, Patrick J.; Nguyen, Tony B.; Brown, Daryl R.; DeSteese, John G.; Speer, Gregory A.

    2004-01-20

    PNNL, in cooperation with three utilities, developed a database and methodology to analyze and characterize the avoided costs of Distributed Generation (DG) deployment as an alternative to traditional distribution system investment. After applying a number of screening criteria to the initial set of 307 cases, eighteen were selected for detailed analysis. Alternative DG investment scenarios were developed for these cases to permit capital, operation, maintenance, and fuel costs to be identified and incorporated into the analysis. The “customer-owned” backup power generator option was also investigated. The results of the analysis of the 18 cases show that none yielded cost savings under the alternative DG scenarios. However, the DG alternative systems were configured using very restrictive assumptions concerning reliability, peak rating, engine types and acceptable fuel. In particular it was assumed that the DG alternative in each case must meet the reliability required of conventional distribution systems (99.91% reliability). The analysis was further constrained by a requirement that each substation meet the demands placed upon it by a one in three weather occurrence. To determine if, by relaxing these requirements, the DG alternative might be more viable, one project was re-examined. The 99.91% reliability factor was still assumed for normal operating conditions but redundancy required to maintain reliability was relaxed for the relatively few hours every three years where extreme weather caused load to exceed present substation capacity. This resulted in the deferment of capital investment until later years and reduced the number of engines required for the project. The cost of both the conventional and DG alternative also dropped because the centralized power generation, variable O&M, and DG fuels costs were calculated based on present load requirements in combination with long-term forecasts of load growth, as opposed to load requirements plus a buffer based on predictions of extraordinary weather conditions. Application of the relaxed set of assumptions reduced the total cost of the DG alternative by roughly 57 percent from $7.0 million to $3.0 million. The reduction, however, did not change the overall result of the analysis, as the cost of the conventional distribution system upgrade alternative remained lower at $1.7 million. This paper also explores the feasibility of using a system of backup generators to defer investment in distribution system infrastructure. Rather than expanding substation capacity at substations experiencing slow load growth rates, PNNL considered a scenario where diesel generators were installed on location at customers participating in a program designed to offer additional power security and reliability to the customer and connection to the grid. The backup generators, in turn, could be used to meet peak demand for a limited number of hours each year, thus deferring distribution system investment. Data from an existing program at one of the three participating utilities was used to quantify the costs associated with the backup generator scenario. The results of the “customer owned” backup power generator analysis showed that in all cases the nominal cost of the DG scenario is more than the nominal cost of the base-case conventional distribution system upgrade scenario. However, in two of the cases the total present value costs of the alternative backup generator scenarios were between 15 and 22% less than those for the conventional scenarios. Overall, the results of the study offer considerable encouragement that the use of DG systems can defer conventional distribution system upgrades under the right conditions and when the DG configurations are intelligently designed. Using existing customer-owned DG to defer distribution system upgrades appears to be an immediate commercially-viable opportunity.

  12. Methods and apparatuses for preparing upgraded pyrolysis oil

    DOE Patents [OSTI]

    Brandvold, Timothy A; Baird, Lance Awender; Frey, Stanley Joseph

    2013-10-01

    Methods and apparatuses for preparing upgraded pyrolysis oil are provided herein. In an embodiment, a method of preparing upgraded pyrolysis oil includes providing a biomass-derived pyrolysis oil stream having an original oxygen content. The biomass-derived pyrolysis oil stream is hydrodeoxygenated under catalysis in the presence of hydrogen to form a hydrodeoxygenated pyrolysis oil stream comprising a cyclic paraffin component. At least a portion of the hydrodeoxygenated pyrolysis oil stream is dehydrogenated under catalysis to form the upgraded pyrolysis oil.

  13. Using Qualified Energy Conservation Bonds for Public Building Upgrades. Reducing Energy Bills in the City of Philadelphia

    SciTech Connect (OSTI)

    Zimring, Mark

    2012-07-18

    Qualified Energy Conservation Bonds (QECBs) are federally-subsidized bonds that enable state, tribal, and local government issuers to borrow money to fund a range of energy conservation projects, including public building upgrades that reduce energy use by at least 20 percent, at very attractive borrowing rates and long terms. As part of the American Recovery and Reinvestment Act (ARRA), the City of Philadelphia received a $15 million QECB award from the U.S. Department of the Treasury (Treasury). The city leveraged $6.25 million of its QECB allocation to finance half of a $12.6 million initiative to upgrade the energy efficiency of City buildings. The upgrades to four city facilities are expected to deliver over $10 million of net savings, and are a major step towards achieving the city’s goal of reducing government energy consumption by 30 percent by 2015.

  14. Upgrading scientific capabilities at the High Flux Isotope Reactor

    SciTech Connect (OSTI)

    West, C.D.; Farrar, M.B.

    1997-07-14

    Following termination of the Advanced Neutron Source (ANS) Project, a program of upgrades to the Department of Energy`s High Flux Isotope Reactor (HFIR) was devised by a team of researchers and reactor operators and has been proposed to the department. HFIR is a multipurpose research reactor, commissioned in 1965, with missions in four nationally important areas: isotope production, especially transuranic isotopes; neutron scattering; neutron activation analysis; and irradiation testing of materials. For neutron scattering, there are two major enhancements and several smaller ones. The first is the installation of a small, hydrogen cold neutron source in one of the four existing beam tubes: because of the high reactor power, and the use of new design concepts developed for ANS, the cold source will be as bright as, or brighter than, the Institute Laue Langevin liquid deuterium vertical cold source, although space limitations mean that there will be far fewer cold beams and instruments at HFIR. This project is underway, and the cold source is expected to come on line following an extended shutdown in 1999 to replace the reactor`s beryllium reflector. The second major change proposed would put five thermal neutron guides at an existing beam port and construct a new guide hall to accommodate instruments on these very intense beams.

  15. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT AN ASSESSMENT, and demonstration (RD&D) projects to benefit California. The Energy Research and Development Division strives Office Manager Energy Generation Research Office Laurie ten Hope Deputy Director Energy Research

  16. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT ADVANCED CHARACTERIZATION OF WIND from this project contributes to Energy Research and Development Division's Energy Generation Research Office Laurie ten Hope Deputy Director Energy Research and Development Division Robert P

  17. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT ENERGYEFFICIENT. The information from this project contributes to Energy Research and Development Division's Industrial Virginia Lew Office Manager Energy Efficiency Research Office Laurie ten Hope Deputy Director ENERGY

  18. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT CALIFORNIA AUTONOMOUS UNMANNED AERIAL, development, and demonstration (RD&D) projects to benefit California. The Energy Research and Development Energy Generation Research Office Laurie ten Hope Deputy Director ENERGY RESEARCH AND DEVELOPMENT

  19. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT ENERGYEFFICIENT. The information from this project contributes to Energy Research and Development Division's Industrial Energy Efficiency Research Office Laurie ten Hope Deputy Director ENERGY RESEARCH AND DEVELOPMENT

  20. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT INTEGRATING BIOENERGETICS, SPACIAL. The information from this project contributes to Energy Research and Development Division's Energy Office Manager Energy Generation Research Office Laurie ten Hope Deputy Director ENERGY RESEARCH

  1. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT RWE SCHOTT SOLAR: California Energy Commission Hassan Mohammed Project Manager Linda Spiegel Office Manager Energy Generation Research Office Laurie ten Hope Deputy Director ENERGY RESEARCH AND DEVELOPMENT DIVISION Robert P. Oglesby

  2. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT PLANNING ALTERNATIVE this project contributes to Energy Research and Development Division's EnergyRelated Environmental Research Energy Generation Research Office Laurie ten Hope Deputy Director ENERGY RESEARCH AND DEVELOPMENT

  3. Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT ENERGY Mohney Contract Manager Kiel Pratt Leah Mohney Project Managers Virginia Lew Office Manager Energy Efficiency Research Office Laurie ten Hope Deputy Director Energy Research and Development Division Robert P

  4. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT ENERGY AND ENVIRONMENTAL PERFORMANCE this project contributes to Energy Research and Development Division's Renewable Energy Technologies Program Energy Generation Research Office Laurie ten Hope Deputy Director ENERGY RESEARCH AND DEVELOPMENT

  5. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT ADVANCED POWER ELECTRONICS INTERFACE, development, and demonstration (RD&D) projects to benefit California. The Energy Research and Development Office Manager Energy Systems Research Office Laurie ten Hope Deputy Director Energy Research

  6. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT A SEASONAL, and demonstration (RD&D) projects to benefit California. The Energy Research and Development Division strives Research Linda Spiegel Office Manager Energy Generation Research Office Laurie ten Hope Deputy Director

  7. Honeymoons Lead to Upgrades in Western Vermont | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    to make energy efficiency upgrades, offering them a honeymoon might just be the motivation they need. NeighborWorks of Western Vermont (NWWVT) created a "honeymoon period" for...

  8. EA-1190: Wastewater Treatment Capability Upgrade, Amarillo, Texas

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposed upgrade of the U.S. Department of Energy Pantex Plant Wastewater Treatment Plant in Amarillo, Texas.

  9. BEST OFFER EVER ACCELERATED TEXAS UPGRADES | Department of Energy

    Energy Savers [EERE]

    upgrades. Program Design: Historically, Austin Energy customers had taken advantage of rebate-only offers more often than loan-only offers. Austin Energy's Best Offer Ever allowed...

  10. California Member Connects Solar Adoption With Upgrades | Department...

    Energy Savers [EERE]

    adoption and energy upgrades by Better Buildings Residential Network member Center for Sustainable Energy (CSE) in California are helping solar companies realize that partnering...

  11. What's Working in Residential Energy Efficiency Upgrade Programs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Approaches and Lessons Learned" on May 20, 2011 in Washington, D.C. What's Working in Residential Energy Efficiency Upgrade Programs More Documents & Publications Strategies...

  12. WISCONSIN CITIES WORK TOGETHER TO ADVANCE UPGRADES | Department...

    Office of Environmental Management (EM)

    from the initial assessment through the completion of energy upgrades. They attended real estate events, home shows, and neighborhood events to promote energy efficiency. The...

  13. Federal Finance Facilities Available for Energy Efficiency Upgrades

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment A Guide for State, Local & Tribal Leaders and their Partners August 28, 2013 2...

  14. Using QECBs for Street Lighting Upgrades: Lighting the Way to...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Revenue Service Qualified Energy Conservation Bonds Using Qualified Energy Conservation Bonds for Public Building Upgrades: Reducing Energy Bills in the City of Philadelphia...

  15. Community based outreach strategies in residential energy upgrade programs

    E-Print Network [OSTI]

    McEwen, Brendan (Brendan Carl Francis)

    2012-01-01

    Home energy upgrades can reduce residential energy consumption and improve indoor conditions, thereby realizing environmental, economic, health and other social benefits. Utilities, government and other actors have established ...

  16. Quality Control, Standardization of Upgrades, and Workforce Expectatio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Expectations Better Buildings Residential Network Workforce Peer Exchange Call Series: Quality Control, Standardization of Upgrades, and Workforce Expectations, March 27, 2014....

  17. Energy Upgrade California Drives Demand From Behind the Wheel...

    Broader source: Energy.gov (indexed) [DOE]

    trailer with the Energy Upgrade California logo and graphics painted on the side. With a goal of "energy efficiency or bust," the California Center for Sustainable Energy (CCSE)...

  18. EECBG Success Story: County Partners with Siemens on Energy Upgrades...

    Broader source: Energy.gov (indexed) [DOE]

    including a solar photovoltaic energy system, LED lighting at municipal buildings, boiler upgrades, energy efficiency retrofits at the county government center, and a public...

  19. Bioenergy Technologies Office R&D Pathways: Algal Lipid Upgrading...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Publications Pathways for Algal Biofuels Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway Bioenergy Technologies Office Conversion R&D Pathway: Whole...

  20. Syngas Upgrading to Hydrocarbon Fuels Technology Pathway | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pathway This technology pathway case investigates the upgrading of woody biomass derived synthesis gas (syngas) to hydrocarbon biofuels. While this specific discussion...

  1. Algal Lipid Extraction and Upgrading to Hydrocarbons Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline-, diesel-, and jet-range hydrocarbon blendstocks. Algal Lipid Extraction and...

  2. NSTX-U Control System Upgrades

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Erickson, K. G.; Gates, D. A.; Gerhardt, S. P.; Lawson, J. E.; Mozulay, R.; Sichta, P.; Tchilinguirian, G. J.

    2014-06-01

    The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forwardmore »port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control.« less

  3. The value of steam turbine upgrades

    SciTech Connect (OSTI)

    Potter, K.; Olear, D.

    2005-11-01

    Technological advances in mechanical and aerodynamic design of the turbine steam path are resulting in higher reliability and efficiency. A recent study conducted on a 390 MW pulverized coal-fired unit revealed just how much these new technological advancements can improve efficiency and output. The empirical study showed that the turbine upgrade raised high pressure (HP) turbine efficiency by 5%, intermediate pressure (IP) turbine efficiency by 4%, and low pressure (LP) turbine efficiency by 2.5%. In addition, the unit's highest achievable gross generation increased from 360 MW to 371 MW. 3 figs.

  4. NERSC Seeks New Director - Job Position Posted

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for Computing Sciences at Berkeley Lab in September 2010. In order to focus more on strategic planning at the lab, she has opened a search for a new NERSC Division Director....

  5. UQ GRADUATE SCHOOL DIRECTOR, CENTRE FOR

    E-Print Network [OSTI]

    Goodhill, Geoffrey J.

    Children's Medical Research Institute (QCMRI) SCHOOLS Architecture Chemical Engineering Civil Engineering Water Management Centre Executive Dean, Faculty of Engineering, Architecture and Information Technology Bryan Mining and Geology Research Centre Centre for Coal Seam Gas Director, Sustainable Minerals

  6. BOARD OF DIRECTORS UCHCFC CIRCLE ROAD CORP.

    E-Print Network [OSTI]

    was also notified that the IRS issued a determination that the Circle Road Corp was tax exempt underBOARD OF DIRECTORS OF THE UCHCFC CIRCLE ROAD CORP. MINUTES OF THE SEPTEMBER 29, 2014 MEETING BOARD

  7. Portsmouth Gaseous Diffusion Plant Director's Final Findings...

    Office of Environmental Management (EM)

    Protection ("Director") under Chapters 3734. and 3745. of the Ohio Revised Code ("ORC"). Go to Table of Contents II. Parties Bound These Orders shall apply to and be binding...

  8. Mr. Carl Schafer Director of Environmental Policy

    Office of Legacy Management (LM)

    45 UY 2 9 1987 Mr. Carl Schafer Director of Environmental Policy Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C. 20301 Dear Mr....

  9. Emergency Medicine Clerkship Directors: Current Work Force

    E-Print Network [OSTI]

    Wald, David A.; Khandelwal, Sorabh; Manthey, David E.; Way, David P.; Ander, Douglas S.; Thibodeau, Lorraine

    2014-01-01

    XV, NO. 4 : July 2014 Western Journal of Emergency MedicineWC, Gill AM, Jordan R. Emergency medicine clerkship direc-of and for the internal medicine clerkship directors: How

  10. Sarah Shannon, Director 777 Glades Road

    E-Print Network [OSTI]

    Fernandez, Eduardo

    Sarah Shannon, Director 777 Glades Road Building 44, Room 277 Phone:561/297-3749 Fax: 561 from the state or Florida Atlantic University. The IOG sustains itself primarily through income derived

  11. The enhanced ASDEX Upgrade pellet centrifuge launcher

    SciTech Connect (OSTI)

    Plöckl, B.; Lang, P. T.

    2013-10-15

    Pellets played an important role in the program of ASDEX Upgrade serving both for investigations on efficient particle fuelling and high density scenarios but also for pioneering work on Edge Localised Mode (ELM) pacing and mitigation. Initially designed for launching fuelling pellets from the magnetic low field side, the system was converted already some time ago to inject pellets from the magnetic high field side as much higher fuelling efficiency was found using this configuration. In operation for more than 20 years, the pellet launching system had to undergo a major revision and upgrading, in particular of its control system. Furthermore, the control system installed adjacent to the launcher had to be transferred to a more distant location enforcing a complete galvanic separation from torus potential and a fully remote control solution. Changing from a hybrid system consisting of PLC S5/S7 and some hard wired relay control to a state of the art PLC system allowed the introduction of several new operational options enabling more flexibility in the pellet experiments. This article describes the new system architecture of control hardware and software, the operating procedure, and the extended operational window. First successful applications for ELM pacing and triggering studies are presented as well as utilization for the development of high density scenarios.

  12. Magnetic switching, final chapter, Book I: the ATA upgrade prototype

    SciTech Connect (OSTI)

    Birx, D.; Cook, E.; Hawkins, S.; Poor, S.; Reginato, L.; Schmidt, J.; Smith, M.W.

    1983-03-22

    Efforts directed at finding a 10 kHz switch to replace the current 1 kHz gas blown spark gap have culminated in a prototype for an upgrade of ATA. The design and performance of this prototype as well as possible options and recommendations concerning an eventual upgrade are described. 4 references, 9 figures.

  13. TMX-Upgrade neutral-beam injection system

    SciTech Connect (OSTI)

    Felker, B.; Kane, R.J.; Wong, R.L.; Calderon, M.O.; Moore, T.L.

    1981-10-05

    The TMX experiment proved that axial confinement of central-cell ions is improved ninefold by the electrostatic potential of end-cell plasmas. The TMX Upgrade task is to improve this confinement further. This paper discusses the injector system aspects of the TMX Upgrade.

  14. Analysis and Qualification Documentation The NSTX Upgrade Team

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Upgrade Final Design Review (6/22/2011) 4 NSTX CSU Calculation Index Historically What is Available Lodestar MIT Nova Photonics New York U ORNL PPPL Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Center Stack Upgrade Final Design Review (6/22/2011) Overview · This presentation is an overview

  15. Rebates Cut the Price of Big-Time Efficiency Upgrades

    Broader source: Energy.gov [DOE]

    One of the smartest ways for homeowners to save money on major appliance upgrades is to hook into an energy efficiency rebate program. The Neighborhood Energy Connection (NEC), a non-profit organization in St. Paul, Minnesota, helps local residents take advantage of Xcel Energy’s rebate programs that cut the cost of whole-house energy efficiency upgrades.

  16. The 12 GeV Energy Upgrade at Jefferson Laboratory

    SciTech Connect (OSTI)

    Pilat, Fulvia C.

    2012-09-01

    Two new cryomodules and an extensive upgrade of the bending magnets at Jefferson Lab has been recently completed in preparation for the full energy upgrade in about one year. Jefferson Laboratory has undertaken a major upgrade of its flagship facility, the CW re-circulating CEBAF linac, with the goal of doubling the linac energy to 12 GeV. I will discuss here the main scope and timeline of the upgrade and report on recent accomplishments and the present status. I will then discuss in more detail the core of the upgrade, the new additional C100 cryomodules, their production, tests and recent successful performance. I will then conclude by looking at the future plans of Jefferson Laboratory, from the commissioning and operations of the 12 GeV CEBAF to the design of the MEIC electron ion collider.

  17. Kitchen Appliance Upgrades Improve Water Efficiency at U.S. Department...

    Energy Savers [EERE]

    Kitchen Appliance Upgrades Improve Water Efficiency at U.S. Department of Defense Exchange Facilities Kitchen Appliance Upgrades Improve Water Efficiency at U.S. Department of...

  18. PROJECT DESCRIPTION PROJECT TIMELINE PROJECT COSTS FUNDING SOURCE 1 Akers Hall, originally constructed in 1964, requires major

    E-Print Network [OSTI]

    will replace the existing chiller plant, including demolition of the existing cooling tower and its associated enclosure at the Olin receiving area; installation of new components for the chilled water system; HVAC DESCRIPTION PROJECT TIMELINE PROJECT COSTS FUNDING SOURCE 3 Munn Ice Arena HVAC Upgrades and Ice

  19. Tile Calorimeter Upgrade Program for the Luminosity Increasing at the LHC

    E-Print Network [OSTI]

    ,

    2015-01-01

    The Tile Calorimeter (TileCal) is the central hadronic calorimeter of the ATLAS experiment at the Large Hadron Collider (LHC). The LHC is scheduled to undergo a major upgrade, in 2022, for the High Luminosity LHC (HL-LHC). The ATLAS upgrade program for high luminosity is split into three phases: Phase-0 occurred during $2013-2014$ and prepared the LHC for Run 2; Phase-I, foreseen for 2019, will prepare the LHC for Run 3, whereafter the peak luminosity reaches $2-3 \\times 10^{34}$ cm$^{2}s^{-1}$; finally, Phase-II, which is foreseen for 2024, will prepare the collider for the HL-LHC operation ($5-7 \\times 10^{34}$ cm$^{2}s^{-1}$). The TileCal main activities for Phase-0 were the installation of the new low voltage power supplies and the activation of the TileCal third layer signal for assisting the muon trigger at $1.01.3$ (TileMuon Project). In Phase-II, a major upgrade in the TileCal readout electronics is planned. Except for the photomultipliers tubes (PMTs), most of the on- and off-detector e...

  20. Extension - Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption

    SciTech Connect (OSTI)

    Anna Lee Tonkovich

    2008-08-11

    The need for cost effective technologies for upgrading coal mine methane to pipeline quality natural gas is becoming ever greater. The current work presents and investigates a new approach to reduce the impact of the most costly step in the conventional technology, nitrogen rejection. The proposed approach is based on the Velocys microchannel platform, which is being developed to commercialize compact and cost efficient chemical processing technology. For this separation, ultra fast thermal swing sorption is enabled by the very high rates of heat and mass transfer inherent in microchannel processing. In a first phase of the project solid adsorbents were explored. Feasibility of ultrafast thermal swing was demonstrated but the available adsorbents had insufficient differential methane capacity to achieve the required commercial economics. In a second phase, ionic liquids were adopted as absorbents of choice, and experimental work and economic analyses, performed to gauge their potential, showed promise for this novel alternative. Final conclusions suggest that a combination of a required cost target for ionic liquids or a methane capacity increase or a combination of both is required for commercialization.

  1. ALICE TPC upgrade for High-Rate operations

    E-Print Network [OSTI]

    ,

    2015-01-01

    A new type of Time Projection Chamber (TPC) has been proposed for the upgrade of the ALICE (A Large Ion Collider Experiment at CERN) so as to cater to the high luminosity environment expected at the Large Hadron Collider (LHC) facility in future. This device will rely on the intrinsic ion back flow (IBF) suppression of Micro-Pattern Gas Detectors (MPGD) based technology in particular the Gas Electron Multiplier (GEM). GEM is to minimise the space charge effect in the main drift volume and thus will not require the standard gating grid and the resulting intrinsic dead time. It will thus be possible to read all minimum bias Pb--Pb events that the Large Hadron Collider (LHC) will deliver at the anticipated peak interaction rate of 50 kHz for the high luminosity heavy-ion era in Run 3. New read-out electronics will send the continuous data stream to a new online farm at rates up to 1~TByte/s. The new read-out chambers will consist of stacks of 4 GEM foils combining different hole pitches. In addition to a low ion...

  2. ALICE TPC upgrade for High-Rate operations

    E-Print Network [OSTI]

    Saikat Biswas

    2015-11-08

    A new type of Time Projection Chamber (TPC) has been proposed for the upgrade of the ALICE (A Large Ion Collider Experiment at CERN) so as to cater to the high luminosity environment expected at the Large Hadron Collider (LHC) facility in future. This device will rely on the intrinsic ion back flow (IBF) suppression of Micro-Pattern Gas Detectors (MPGD) based technology in particular the Gas Electron Multiplier (GEM). GEM is to minimise the space charge effect in the main drift volume and thus will not require the standard gating grid and the resulting intrinsic dead time. It will thus be possible to read all minimum bias Pb--Pb events that the Large Hadron Collider (LHC) will deliver at the anticipated peak interaction rate of 50 kHz for the high luminosity heavy-ion era in Run 3. New read-out electronics will send the continuous data stream to a new online farm at rates up to 1~TByte/s. The new read-out chambers will consist of stacks of 4 GEM foils combining different hole pitches. In addition to a low ion back flow ($<$ 1\\%) other important requirements are good energy resolution (better than 12\\% (sigma) for $^{55}$Fe X-rays) and operational stability.

  3. PEP-II Transverse Feedback Electronics Upgrade

    SciTech Connect (OSTI)

    Weber, J.M.; Chin, M.J.; Doolittle, L.R.; Akre, R.; /SLAC

    2006-03-13

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx{reg_sign} ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design.

  4. PEP-II Transverse Feedback Electronics Upgrade

    SciTech Connect (OSTI)

    Weber, J.; Chin, M.; Doolittle, L.; Akre, R.

    2005-05-09

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx(R) ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design.

  5. Steam turbine upgrading: low-hanging fruit

    SciTech Connect (OSTI)

    Peltier, R.

    2006-04-15

    The thermodynamic performance of the steam turbine, more than any other plant component, determines overall plant efficiency. Upgrading steam path components and using computerized design tools and manufacturing techniques to minimise internal leaks are two ways to give tired steam turbines a new lease on life. The article presents three case studies that illustrate how to do that. These are at Unit 1 of Dairyland's J.P. Madgett Station in Alma, WI, a coal-fired subcritical steam plant; the four units at AmerenUE's 600 MW coal-fired Labadie plant west of St. Louis; and Unit 3 of KeyPlan Corp's Northport Power Station on Long Island. 8 figs.

  6. Upgrading the TFTR Transrex Power Supplies

    SciTech Connect (OSTI)

    J. E. Lawson, R. Marsala, S. Ramakrishnan, X. Zhao, P. Sichta

    2009-05-29

    In order to provide improved and expanded experimental capabilities, the existing Transrex power supplies at PPPL are to be upgraded and modernized. Each of the 39 power supplies consists of two six pulse silicon controlled rectifier sections forming a twelve pulse power supply. The first modification is to split each supply into two independent six pulse supplies by replacing the existing obsolete twelve pulse firing generator with two commercially available six pulse firing generators. The second change replaces the existing control link with a faster system, with greater capacity, which will allow for independent control of all 78 power supply sections. The third change replaces the existing Computer Automated Measurement and Control (CAMAC) based fault detector with an Experimental Physics and Industrial Control System (EPICS) compatible unit, eliminating the obsolete CAMAC modules. Finally the remaining relay logic and interfaces to the "Hardwired Control System" will be replaces with a Programmable Logic Controller (PLC).

  7. LLRF System for the CEBAF Separator Upgrade

    SciTech Connect (OSTI)

    Plawski, Tomasz E.; Bachimanchi, Ramakrishna; Hovater, J. Curt; Seidman, David J.; Wissmann, Mark J.

    2014-12-01

    The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of four new 748.5 MHz normal conducting deflecting cavities in the 5th pass extraction region. This system will work together with the existing 499 MHz RF Separator in order to allow simultaneous delivery of the beam to four CEBAF experimental halls. The RF system employs two digital LLRF systems controlling four cavities in a vector sum. Cavity tune information of the individual cavities is also obtained using a multiplexing scheme of the forward and reflected RF signals. In this paper we will present detailed LLRF design and the current status of the CEBAF 748.5/499 MHz beam extraction system.

  8. JET neutral beam power upgrade Introduction

    E-Print Network [OSTI]

    shutdown project · Hydraulic,vacuumcompatibilityandpower loading commissioning of the enhanced NB system · Nolosstimeinjuriesincurredaspartofthe shutdown · Commissioningactivitiesonhydraulicsystems and vacuum compatibility successfully

  9. Upgraded HFIR Fuel Element Welding System

    SciTech Connect (OSTI)

    Sease, John D [ORNL

    2010-02-01

    The welding of aluminum-clad fuel plates into aluminum alloy 6061 side plate tubing is a unique design feature of the High Flux Isotope Reactor (HFIR) fuel assemblies as 101 full-penetration circumferential gas metal arc welds (GMAW) are required in the fabrication of each assembly. In a HFIR fuel assembly, 540 aluminum-clad fuel plates are assembled into two nested annular fuel elements 610 mm (24-inches) long. The welding process for the HFIR fuel elements was developed in the early 1960 s and about 450 HFIR fuel assemblies have been successfully welded using the GMAW process qualified in the 1960 s. In recent years because of the degradation of the electronic and mechanical components in the old HFIR welding system, reportable defects in plate attachment or adapter welds have been present in almost all completed fuel assemblies. In October 2008, a contract was awarded to AMET, Inc., of Rexburg, Idaho, to replace the old welding equipment with standard commercially available welding components to the maximum extent possible while maintaining the qualified HFIR welding process. The upgraded HFIR welding system represents a major improvement in the welding system used in welding HFIR fuel elements for the previous 40 years. In this upgrade, the new inner GMAW torch is a significant advancement over the original inner GMAW torch previously used. The innovative breakthrough in the new inner welding torch design is the way the direction of the cast in the 0.762 mm (0.030-inch) diameter aluminum weld wire is changed so that the weld wire emerging from the contact tip is straight in the plane perpendicular to the welding direction without creating any significant drag resistance in the feeding of the weld wire.

  10. Designation of Environmental Management Federal Project Director for

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would like submit theCovalent BondingMeeting |Design Competitions Designthe 29 thOffice

  11. Designation of Environmental Management Federal Project Director for

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would like submit theCovalent BondingMeeting |Design Competitions Designthe 29

  12. Darrie Ganzhorn: Director of Programs and Operations, Homeless Garden Project

    E-Print Network [OSTI]

    Reti, Irene H.

    2010-01-01

    coming back from the war in Iraq been working with you?right now, but they’re not Iraq war veterans. There is that

  13. Charles D. Young Project Engineer Government Support Directorate

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and Myers Co -VANaval ,, *' ;x-L* d! CT NC0 -Please

  14. . MEMORANDUM FOR STEVEN B. FElNBERO FEDERAL PROJECT DIRECTOR

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired SolarAboutXuRod Hunt (208)InventorHow to Save(ANL-IN-03-032).

  15. Chris Bergren Director, Environment Compliance & Area Completion Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room News PublicationsAudits &BradburyMayARM-0501 MarineCenter Chemistry:ChinChooseChos

  16. Response to Director's Review of Fermilab Project Management Improvement Initiatives

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100Nationalquestionnaires 0serial codes on Resources

  17. MINERvA Project Director's Review Aug 2006 Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory ofDid you notHeat PumpsTechnologiesTechnologies |

  18. MINERvA Project Director's Review Dec 2005 Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory ofDid you notHeat PumpsTechnologiesTechnologies |Reviews Main INjector

  19. Post Critical Decision-4 Mark Arenaz, Federal Project Director

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuilding energyDepartment of Energy PortsmouthWasteDepartment

  20. Project Management Perspective - Paul Bosco, Director, Office of

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget | DepartmentLogistical

  1. Fermilab | Directorate | Office of Project Management Oversight (OPMO) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journal Article) | SciTech ConnectTimothy MeyerFermilabDOE

  2. Fermilab | Directorate | Office of Project Management Oversight (OPMO) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journal Article) | SciTech ConnectTimothy MeyerFermilabDOEPolicies and

  3. Fermilab | Directorate | Office of Project Management Oversight (OPMO) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journal Article) | SciTech ConnectTimothy MeyerFermilabDOEPolicies

  4. Fermilab | Directorate | Office of Project Management Oversight (OPMO) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journal Article) | SciTech ConnectTimothy

  5. Wendy Cain named portfolio federal project director for ETTP cleanup |

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann Jackson About1996HowFOAShowingFuelWeatherize » Air SealingDepartment

  6. MEMORANDUM FOR JOHN M. SATTLER DIRECTOR BROOKHAVEN FEDERAL PROJECT OFFICE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverseIMPACTThousandReport) | SciTech ConnectFuture3, BPADepartment ofJulyl 4

  7. FMEA on the superconducting torus for the Jefferson Lab 12 GeV accelerator upgrade

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ghoshal, Probir K.; Biallas, George H.; Fair, Ruben J.; Rajput-Ghoshal, Renuka; Schneider, William J.; Legg, Robert A.; Kashy, David H.; Hogan, John P.; Wiseman, Mark A.; Luongo, Cesar; et al

    2015-01-16

    As part of the Jefferson Lab 12GeV accelerator upgrade project, Hall B requires two conduction cooled superconducting magnets. One is a magnet system consisting of six superconducting trapezoidal racetrack-type coils assembled in a toroidal configuration and the second is an actively shielded solenoidal magnet system consisting of 5 coils. Both magnets are to be wound with Superconducting Super Collider-36 NbTi strand Rutherford cable soldered into a copper channel. This paper describes the various failure modes in torus magnet along with the failure modes that could be experienced by the torus and its interaction with the solenoid which is located inmore »close proximity.« less

  8. Vibration Response Testing of the CEBAF 12GeV Upgrade Cryomodules

    SciTech Connect (OSTI)

    Davis, G. Kirk; Matalevich, Joseph R.; Wiseman, Mark A.; Powers, Thomas J.

    2012-09-01

    The CEBAF 12 GeV upgrade project includes 80 new 7-cell cavities to form 10 cryomodules. These cryomodules were tested during production to characterize their microphonic response in situ. For several early cryomodules, detailed (vibration) modal studies of the cryomodule string were performed during the assembly process to identify the structural contributors to the measured cryomodule microphonic response. Structural modifications were then modelled, implemented, and verified by subsequent modal testing and in-situ microphonic response testing. Interim and latest results from this multi-stage process will be reviewed.

  9. Greenbelt Homes Pilot Program. Summary of Building Envelope Retrofits, Planned HVAC Equipment Upgrades, and Energy Savings

    SciTech Connect (OSTI)

    Wiehagen, J.; Del Bianco, M.; Mallay, D.

    2015-05-22

    The U.S. Department of Energy Building America team Partnership for Home Innovation wrote a report on Phase 1 of the project that summarized a condition assessment of the homes and evaluated retrofit options within the constraints of the cooperative provided by GHI. Phase 2 was completed following monitoring in the 2013–2014 winter season; the results are summarized in this report. Phase 3 upgrades of heating equipment will be implemented in time for the 2014–2015 heating season and are not part of this report.

  10. AMI FW UPGRADEABILITY TEST PROCEDURE AND SECURITY ASSESSMENT

    SciTech Connect (OSTI)

    Snyder, Isabelle B

    2014-01-01

    The National Institute of Standards and Technology (NIST) is producing NISTIR 7823 to define test requirements for Smart Meter upgradability. The term Smart Meter refers specifically to advanced electric meters being deployed to enhance management of electricity distribution for residential and industrial consumers. The underlying functional and security requirements for Smart Meter upgradability are specified in NEMA standard SG-AMI 1-2009. The purpose of NISTIR 7823 is to describe conformance test requirements that may be used voluntarily by testers and/or test laboratories to determine whether Smart Meters and Upgrade Management Systems conform to the requirements of NEMA SG-AMI 1-2009.

  11. Upgrading of petroleum oil feedstocks using alkali metals and hydrocarbons

    SciTech Connect (OSTI)

    Gordon, John Howard

    2014-09-09

    A method of upgrading an oil feedstock by removing heteroatoms and/or one or more heavy metals from the oil feedstock composition. This method reacts the oil feedstock with an alkali metal and an upgradant hydrocarbon. The alkali metal reacts with a portion of the heteroatoms and/or one or more heavy metals to form an inorganic phase separable from the organic oil feedstock material. The upgradant hydrocarbon bonds to the oil feedstock material and increases the number of carbon atoms in the product. This increase in the number of carbon atoms of the product increases the energy value of the resulting oil feedstock.

  12. Director's Corner | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory ofDid you not find what you were lookingAboutDirector Director

  13. 2011 Computation Directorate Annual Report

    SciTech Connect (OSTI)

    Crawford, D L

    2012-04-11

    From its founding in 1952 until today, Lawrence Livermore National Laboratory (LLNL) has made significant strategic investments to develop high performance computing (HPC) and its application to national security and basic science. Now, 60 years later, the Computation Directorate and its myriad resources and capabilities have become a key enabler for LLNL programs and an integral part of the effort to support our nation's nuclear deterrent and, more broadly, national security. In addition, the technological innovation HPC makes possible is seen as vital to the nation's economic vitality. LLNL, along with other national laboratories, is working to make supercomputing capabilities and expertise available to industry to boost the nation's global competitiveness. LLNL is on the brink of an exciting milestone with the 2012 deployment of Sequoia, the National Nuclear Security Administration's (NNSA's) 20-petaFLOP/s resource that will apply uncertainty quantification to weapons science. Sequoia will bring LLNL's total computing power to more than 23 petaFLOP/s-all brought to bear on basic science and national security needs. The computing systems at LLNL provide game-changing capabilities. Sequoia and other next-generation platforms will enable predictive simulation in the coming decade and leverage industry trends, such as massively parallel and multicore processors, to run petascale applications. Efficient petascale computing necessitates refining accuracy in materials property data, improving models for known physical processes, identifying and then modeling for missing physics, quantifying uncertainty, and enhancing the performance of complex models and algorithms in macroscale simulation codes. Nearly 15 years ago, NNSA's Accelerated Strategic Computing Initiative (ASCI), now called the Advanced Simulation and Computing (ASC) Program, was the critical element needed to shift from test-based confidence to science-based confidence. Specifically, ASCI/ASC accelerated the development of simulation capabilities necessary to ensure confidence in the nuclear stockpile-far exceeding what might have been achieved in the absence of a focused initiative. While stockpile stewardship research pushed LLNL scientists to develop new computer codes, better simulation methods, and improved visualization technologies, this work also stimulated the exploration of HPC applications beyond the standard sponsor base. As LLNL advances to a petascale platform and pursues exascale computing (1,000 times faster than Sequoia), ASC will be paramount to achieving predictive simulation and uncertainty quantification. Predictive simulation and quantifying the uncertainty of numerical predictions where little-to-no data exists demands exascale computing and represents an expanding area of scientific research important not only to nuclear weapons, but to nuclear attribution, nuclear reactor design, and understanding global climate issues, among other fields. Aside from these lofty goals and challenges, computing at LLNL is anything but 'business as usual.' International competition in supercomputing is nothing new, but the HPC community is now operating in an expanded, more aggressive climate of global competitiveness. More countries understand how science and technology research and development are inextricably linked to economic prosperity, and they are aggressively pursuing ways to integrate HPC technologies into their native industrial and consumer products. In the interest of the nation's economic security and the science and technology that underpins it, LLNL is expanding its portfolio and forging new collaborations. We must ensure that HPC remains an asymmetric engine of innovation for the Laboratory and for the U.S. and, in doing so, protect our research and development dynamism and the prosperity it makes possible. One untapped area of opportunity LLNL is pursuing is to help U.S. industry understand how supercomputing can benefit their business. Industrial investment in HPC applications has historically been limited by the prohibitive cost of entry

  14. Financing Energy Efficient Upgrades with ENERGY STAR®

    Office of Energy Efficiency and Renewable Energy (EERE)

    Learn how public sector organizations are improving energy efficiency with innovative solutions to financial barriers. Attendees will learn about financing projects in the public and private...

  15. 2015 Safeguards and Security Directors Conference - July 14 ...

    Office of Environmental Management (EM)

    2015 Safeguards and Security Directors Conference - July 14 - 16, 2015 2015 Safeguards and Security Directors Conference - July 14 - 16, 2015 April 20, 2015 - 1:20pm Addthis The...

  16. Secretary Bodman and Rosatom Director Kiriyenko Meet to Discuss...

    Office of Environmental Management (EM)

    and Rosatom Director Kiriyenko Meet to Discuss U.S.-Russia Nuclear Security Progress Secretary Bodman and Rosatom Director Kiriyenko Meet to Discuss U.S.-Russia Nuclear Security...

  17. Software/Electronic Equipment Reimbursed Under Grants Although you may purchase a software upgrade, PDA, laptop, or other electronic items specifically for

    E-Print Network [OSTI]

    Kurapov, Alexander

    Software/Electronic Equipment Reimbursed Under Grants Although you may purchase a software upgrade college-wide activities and functions. OSU general guidelines: Unique Electronic Items & Software, software and other unique electronic items with sponsored project funds must be in conformance with OMB

  18. Webinar: Introduction to Better Buildings Home Upgrade Program Accelerator

    Broader source: Energy.gov [DOE]

    DOE recently launched the new Better Buildings Home Upgrade Program Accelerator that will focus on the adoption of HPXML and other process improvements to reduce administrative costs and improve...

  19. The run IIb trigger upgrade for the DO experiment

    E-Print Network [OSTI]

    Wilson, Graham Wallace; Padley, P.; Olsen, J.; Narain, M.; Mitrevski, J.; Le Du, P.; Laurens, P.; Johnson, M.; Johns, K.; Hirosky, R.; Hildreth, M.

    2004-06-01

    The increase in instantaneous luminosity anticipated in Run IIb of the Tevatron collider at Fermilab requires increased background rejection capabilities from the trigger system of the DO detector. A set of upgrades is under way to improve...

  20. Capturing Energy Efficiency Upgrades in the Real Estate Transaction

    Broader source: Energy.gov [DOE]

    "Capturing Energy Efficiency Upgrades in the Real Estate Transaction," by Residential Energy Efficiency Solutions, July 10, 2012. Describes the concept of a residential MPG number as a simple way of describing a home’s energy consumption.

  1. Bedford Energizes Other Communities to Upgrade | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Jobs-Green New York Program. The state provided homeowners a 10% rebate on the total cost of the upgrades once completed. Workforce Development: Energize New York created the...

  2. Financing Energy Upgrades for K-12 School Districts

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 11, 2013 and dealing with how to finance energy efficiency upgrades for K-12 school districts.

  3. What's Working in Residential Energy Efficiency Upgrade Programs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Institute Martha Jane Murray, Clinton Climate Initiative 11:00 a.m. - 12:30 p.m. Driving Demand for Residential Building Upgrades Moderator: David Weitz, Conservation Services...

  4. Idaho: Nez Perce Tribe Energy-Efficient Facilities Upgrade |...

    Office of Environmental Management (EM)

    as adding insulation and motion sensors. As a result of the upgrades, the Tribe's electrical energy consumption is estimated to be reduced by 30%, thereby reducing the cost to...

  5. Direct Catalytic Upgrading of Current Dilute Alcohol Fermentation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Direct Catalytic Upgrading of Current Dilute Alcohol Fermentation Streams to Hydrocarbons for Fungible Fuels 2.3.1.100 Chaitanya Narula, 1 Zhenglong Li, 1 E. Casbeer, 1 Robert A....

  6. TheSquareKilometreArray ProjectDescriptionforAstro2010

    E-Print Network [OSTI]

    Groppi, Christopher

    TheSquareKilometreArray ProjectDescriptionforAstro2010 ResponsetoProgramPrioritizationPanels 1Campbell,Director,NAIC FredLo,Director,NRAO #12;1 Summary The Square Kilometre Array (SKA) is a revolutionary telescope for phased deployment. Phase 1 comprising low-and-mid frequency arrays will be funding-ready early next

  7. The Computation Directorate at Lawrence Livermore National Laboratory

    SciTech Connect (OSTI)

    Cook, L

    2006-09-07

    The Computation Directorate at Lawrence Livermore National Laboratory has four major areas of work: (1) Programmatic Support -- Programs are areas which receive funding to develop solutions to problems or advance basic science in their areas (Stockpile Stewardship, Homeland Security, the Human Genome project). Computer scientists are 'matrixed' to these programs to provide computer science support. (2) Livermore Computer Center (LCC) -- Development, support and advanced planning for the large, massively parallel computers, networks and storage facilities used throughout the laboratory. (3) Research -- Computer scientists research advanced solutions for programmatic work and for external contracts and research new HPC hardware solutions. (4) Infrastructure -- Support for thousands of desktop computers and numerous LANs, labwide unclassified networks, computer security, computer-use policy.

  8. Barbara DeHaven Executive Director

    E-Print Network [OSTI]

    Yang, Eui-Hyeok

    Jessica Grady Postaward Specialist Steve Berhang Director ­ Sponsored Contracts and Export Controls Office and resolution Review and negotiate research contracts Negotiate and issue all subcontracts Provide expertise FCOI; ITAR, IRB, IACUC and IBSC; Small Business Subcontracting Plans; OSP-specific section

  9. Computing Sciences Director's Review Vision and Strategy

    E-Print Network [OSTI]

    Distributed Systems Department National Energy Research Scientific Computing Division and Information Power generation space shuttle, etc. Scientific data analysis and computational modeling with a world-wide scope of participants ­ e.g. High Energy Physics data analysis #12;5 Computing Sciences Director's Review Applications

  10. Computing Sciences Director's Review Vision and Strategy

    E-Print Network [OSTI]

    Distributed Systems Department National Energy Research Scientific Computing Division and Information Power shuttle, etc. Scientific data analysis and computational modeling with a world-wide scope of participants ­ e.g. High Energy Physics data analysis #12;5 Computing Sciences Director's Review Applications Real

  11. Ed Synakowski Associate Director, Office of Science

    E-Print Network [OSTI]

    Ed Synakowski Associate Director, Office of Science Fusion Energy Sciences The charge for advice on strategic planning Presented to FESAC April 9, 2014 http://science.energy.gov/fes #12;The Office of Science, and pulse lengths; · Discovery Plasma Science ­ the study of laboratory plasmas and the high energy density

  12. Director's Foreword Brief Scientific Report on Programmes

    E-Print Network [OSTI]

    Page Director's Foreword Brief Scientific Report on Programmes Introducing Sir David Wallace Recent and Future Programmes Scientific Steering Committee Scientific Policy Statement Programme Participation Young as a major player on the world mathematical stage, and as a strong asset to the mathematical sciences

  13. Katherine Diggs Director of Business Management

    E-Print Network [OSTI]

    Vertes, Akos

    , communication, motivation and conflict management ·Change leadership NO OThER LAW FIRM MANAGEMENT MASTERKatherine Diggs Director of Business Management Simpson Thacher & Bartlett LLP New York City, NY The George Washington University Master of Professional Studies and Certificate in Law Firm Management

  14. Mark Walker Director of Public Affairs

    E-Print Network [OSTI]

    assistance from the Bonneville Power Administration, which has not raised its conservation budget. If othersMark Walker Director of Public Affairs Northwest Power and Conservation Council Dear Mr. Walker, I Northwest Power and Conservation Plan. According to your recent study, Â"A Retrospective Look

  15. Mark Walker Director of Public Affairs

    E-Print Network [OSTI]

    assistance from the Bonneville Power Administration, which has not raised its conservation budget. If othersMark Walker Director of Public Affairs Northwest Power and Conservation Council Dear Mr. Walker, I Power and Conservation Plan. That's great news! According to your recent study, "A Retrospective Look

  16. Armando Fana Miami Field Office Director

    E-Print Network [OSTI]

    Fernandez, Eduardo

    Armando Fana Miami Field Office Director HUD Programs #12;HUD's Role HUD provides a variety and their use of the Federal HUD funds ­ FHA ­ Technical assistance ­ Enforcement of fair housing rights methods, healthy homes, energy efficiency, regulatory barrier reduction) #12;HUD's Role Outreach

  17. Edmund Synakowski Associate Director, Office of Science

    E-Print Network [OSTI]

    Edmund Synakowski Associate Director, Office of Science Fusion Energy Sciences FES Update on Strategic Planning FESAC Meeting March 12, 2015 #12;2 For this talk Mission The mission of the Fusion Energy and densities and to build the scientific foundations needed to develop a fusion energy source

  18. Ed Synakowski Associate Director, Office of Science

    E-Print Network [OSTI]

    Ed Synakowski Associate Director, Office of Science Fusion Energy Sciences FES Update and the FY 2015 Budget Proposal Presented to FESAC April 9, 2014 http://science.energy.gov/fes #12;Welcome In recognition of 24 years of dedicated service as the Federal representative to the Fusion Energy Sciences

  19. Director Leaving the National Energy Technology Laboratory

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy today announced that Carl O. Bauer is retiring from federal service and leaving the National Energy Technology Laboratory effective February 28, 2010, following a distinguished four-year tenure as the laboratory's director, completing an impressive federal civilian and military career.

  20. Richard Holdaway Director, Space Science & Technology

    E-Print Network [OSTI]

    Crawford, Ian

    Richard Holdaway Director, Space Science & Technology Rutherford Appleton Laboratory 1 #12? Are there places beyond the Solar System where life might exist or arise? How did life on Earth start? Climate studies How does climate on Earth relate to climate on other planets? Do they evolve differently

  1. Upgrade to the Birmingham Irradiation Facility

    E-Print Network [OSTI]

    Dervan, P; Hodgson, P; Marin- Reyes; Parker, K; Wilson, J; Baca, M

    2015-01-01

    The Birmingham Irradiation Facility was developed in 2013 at the University of Birmingham using the Medical Physics MC40 cyclotron. It can achieve High Luminosity LHC (HL-LHC) fluences of 10^15 (1 MeV neutron equivalent (neq)) cm^-2 in 80 s with proton beam currents of 1 ?A and so can evaluate effectively the performance and durability of detector technologies and new components to be used for the HL-LHC. Irradiations of silicon sensors and passive materials can be carried out in a temperature controlled cold box which moves continuously through the homogenous beamspot. This movement is provided by a pre-configured XY-axis Cartesian robot scanning system. In 2014 the cooling system and cold box were upgraded from a recirculating glycol chiller system to a liquid nitrogen evaporative system. The new cooling system achieves a stable temperature of 50 1C in 30 min and aims to maintain sub-0 1C temperatures on the sensors during irradiations. This paper reviews the design, development, commissioning and perform...

  2. Syngas Upgrading to Hydrocarbon Fuels Technology Pathway

    SciTech Connect (OSTI)

    Talmadge, M.; Biddy, Mary J.; Dutta, Abhijit; Jones, Susanne B.; Meyer, Pimphan A.

    2013-03-31

    In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to hydrocarbon fuels to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This pathway case investigates the upgrading of biomass derived synthesis gas (‘syngas’) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and risk adverse conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas to hydrocarbon pathway to be competitive with petroleum-derived gasoline, diesel and jet range blendstocks.

  3. LHCb : Tracking system of the LHCb upgrade

    E-Print Network [OSTI]

    Szumlak, Tomasz

    2015-01-01

    The upgrade of the LHCb experiment will run at an instantaneous luminosity of 2x10^33 cm^-2 s^-1 with a fully software based trigger, allowing to read out the detector at a rate of 40MHz. For this purpose, the full tracking system will be newly developed: the vertex locator (VELO) will be replaced by a pixel-based detector, withstanding the high radiation dose and providing an excellent track reconstruction with an efficiency of above 99% for all charged particles of interest. Upstream of the magnet, a silicon mico-strip detector with a high granularity and an improved acceptance coverage, called the Upstream Tracker (UT), will replace the current silicon strip tracker, and provide a rough momentum estimate. The tracking system downstream of the magnet will be replaced by the Scintillating Fibre tracker (SciFi), which will consist of 12 layers using 2.5m long scintillating fibres read out by silicon photo-multipliers, providing a spatial resolution better than 100 micron and resulting in a total momentum reso...

  4. Naphthene upgrading with pillared synthetic clay catalysts

    SciTech Connect (OSTI)

    Sharma, R.K.; Olson, E.S. [Univ. of North Dakota, Grand Forks, ND (United States)

    1995-12-31

    Catalytic hydrotreatment of methylcyclohexane was investigated to model upgrading of coal-derived naphthenes. Nickel-substituted synthetic mica montmorillonite (NiSMM), alumina-pillared NiSMM and Zirconia-pillared NiSMM were prepared and tested for hydrocracking and hydroisomerization of methylcyclohexane. Infrared and thermal desorption studies of the pyridine-adsorbed catalysts indicated the presence of Lewis and Bronsted acid sites. Total acidity and surface area increased with pillaring of NiSMM with polyoxy aluminum and polyoxy zirconium cations. Methylcyclohexane was reacted with these catalysts under a variety of conditions. Pillared clays gave higher gas yields and higher hydrocracking but lower hydroisomerization activity than nonpillared clay. The majority of the products were branched alkanes (isoparaffinic). These catalysts effectively use hydrogen as indicated by the minimal formation of aromatic hydrocarbons, coke, or other oligomeric materials. The effect of various operating conditions, i.e., reaction temperature, contact time, H{sub 2} pressure, and catalyst, on the product distribution will be described.

  5. Screening of processing and upgrading schemes

    SciTech Connect (OSTI)

    Not Available

    1991-10-01

    The RFP was predicated on DOE's desire to enhance the development of advanced transportation fuels made from coal via a program to process mild coal gasification (MCG) liquids into high volumetric energy density (HEDF) test fuels. The desired product fuels were to be cost effectively manufactured, have high volumetric energy density, and be hydrocarbon-based for existing and prototype turbine and diesel engines. The sources for these special fuels consist of the abundant and secure indigenous energy resources of coal. Comparison studies were also to be made using other non-petroleum fossil fuels such as shale oil and tar sands bitumen. METC has concluded that MCG technology has the potential to simultaneously satisfy the transportation and power generation fuel needs in the most cost-effective manner. MCG is based on low temperature pyrolysis, a technique known to the coal community for over a century. Most past pyrolysis developments were aimed at maximizing the liquids yield which results in a low quality tarry product requiring significant and capital intensive upgrading. By properly tailoring the pyrolysis severity to control the liquid yield-liquid quality relationship, it has been found that a higher quality distillate-boiling liquid can be readily skimmed'' from the coal. The resultant liquids have a much higher H/C ratio than conventional pyrolytic tars and therefore can be hydroprocessed at lower cost. These liquids are also extremely enriched in 1-, 2-, and 3-ring aromatics.

  6. Optical Link ASICs for the LHC Upgrade

    E-Print Network [OSTI]

    K. K. Gan; H. P. Kagan; R. D. Kass; J. R. Moore; D. S. Smith

    2009-11-23

    We have designed three ASICs for possible applications in the optical links of a new layer of pixel detector in the ATLAS experiment for the first phase of the LHC luminosity upgrade. The ASICs include a high-speed driver for the VCSEL, a receiver/decoder to decode the signal received at the PIN diode to extract the data and clock, and a clock multiplier to produce a higher frequency clock to serialize the data for transmission. These ASICs were designed using a 130 nm CMOS process to enhance the radiation-hardness. We have characterized the fabricated ASICs and the submission has been mostly successful. We irradiated the ASICs with 24 GeV/c protons at CERN to a dosage of 70 Mrad. We observed no significant degradation except the driver circuit in the VCSEL driver fabricated using the thick oxide process in order to provide sufficient voltage to drive a VCSEL. The degradation is due to a large threshold shifts in the PMOS transistors used.

  7. HAWC Upgrade with a Sparse Outrigger Array

    E-Print Network [OSTI]

    Sandoval, A

    2015-01-01

    The High Altitude Water Cherenkov (HAWC) high-energy gamma-ray observatory has recently been completed on the slopes of the Sierra Negra volcano in central Mexico. HAWC consists of 300 Water Cherenkov Detectors, each containing 180 m$^3$ of ultra-purified water, that cover a total surface area of 20,000 m$^2$. It detects and reconstructs cosmic- and gamma-ray showers in the energy range of 100 GeV to 100 TeV. The HAWC trigger for the highest energy gammas reaches an effective area of 10$^5$ m$^2$ but many of them are poorly reconstructed because the shower core falls outside the array. An upgrade that increases the present fraction of well reconstructed showers above 10 TeV by a factor of 3-4 can be done with a sparse outrigger array of small water Cherenkov detectors that pinpoint the core position and by that improve the angular resolution of the reconstructed showers. Such an outrigger array would be of the order of 200 small water Cherenkov detectors of 2.5 m$^3$ placed over an area four times larger than...

  8. 1Directorate-General for Energy and Transport countdowncountdown

    E-Print Network [OSTI]

    Hansen, Johan P.

    1Directorate-General for Energy and Transport April 2002 TheThe countdowncountdown has startedhas started #12;2Directorate-General for Energy and Transport The European satellite radionavigation programme;3Directorate-General for Energy and Transport "In the same way that no one nowadays can ignore the time of day

  9. Randall H. Landsberg Director of Education & Outreach KICP

    E-Print Network [OSTI]

    Collar, Juan I.

    ;Particles from Space Ultra High Energy Cosmic Rays · Pierre Auger Observatory (Malague, Argentina) · VERITASRandall H. Landsberg Director of Education & Outreach KICP Director of Public Outreach Dept AA & Outreach KICP Director of Public Outreach Dept AA Astronomical Visualizations from the Research Frontiers

  10. Managing Director, Massachusetts Energy Extension Initiative University of Massachusetts Amherst

    E-Print Network [OSTI]

    Schweik, Charles M.

    Managing Director, Massachusetts Energy Extension Initiative University of Massachusetts Amherst a track record in a public or private setting related to energy. The Managing Director will focus The University of Massachusetts Amherst invites applications for the Managing Director of the Massachusetts

  11. NSTX Program Overview andNSTX Program Overview and NSTX Upgrade Physics Design ProgressNSTX Upgrade Physics Design Progress

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    -B318, PPPL NSTXNSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INL in Upgrade 6. Develop normally-conducting radiation-tolerant magnets for ST applications · Desig

  12. A transverse bunch by bunch feedback system for Pohang Light Source upgrade

    SciTech Connect (OSTI)

    Lee, E.-H.; Kim, D.-T.; Huang, J.-Y.; Shin, S.; Nakamura, T.; Kobayashi, K.

    2014-12-15

    The Pohang Light Source upgrade (PLS-II) project has successfully upgraded the Pohang Light Source (PLS). The main goals of the PLS-II project are to increase the beam energy to 3 GeV, increase the number of insertion devices by a factor of two (20 IDs), increase the beam current to 400 mA, and at the same time reduce the beam emittance to below 10 nm by using the existing PLS tunnel and injection system. Among 20 insertion devices, 10 narrow gap in-vacuum undulators are in operation now and two more in-vacuum undulators are to be installed later. Since these narrow gap in-vacuum undulators are most likely to produce coupled bunch instability by the resistive wall impedance and limit the stored beam current, a bunch by bunch feedback system is implemented to suppress coupled bunch instability in the PLS-II. This paper describes the scheme and performance of the PLS-II bunch by bunch feedback system.

  13. Improved Catalysts for Heavy Oil Upgrading Based on Zeolite Y Nanoparticles Encapsulated Stable Nanoporous Host

    SciTech Connect (OSTI)

    Conrad Ingram; Mark Mitchell

    2007-09-30

    The objective of this project is to synthesize nanocrystals of highly acidic zeolite Y nanoclusters, encapsulate them within the channels of mesoporous (nanoporous) silicates or nanoporous organosilicates, and evaluate the 'zeolite Y/Nanoporous host' composites as catalysts for the upgrading of heavy petroleum feedstocks. In comparison to conventionally-used zeolite Y catalysts of micron size particles, the nanocrystals (< 100 nm particle size) which contain shorter path lengths, are expected to allow faster diffusion of large hydrocarbon substrates and the catalysis products within and out of the zeolite's channels and cages (<1 nm size). This is expected to significantly reduce deactivation of the catalyst and to prolong their period of reactivity. Encapsulating zeolite Y nanocrystals within the nanoporous materials is expected to protect its external surfaces and pore entrances from being blocked by large hydrocarbon substrates, since these substrates will initially be converted to small molecules by the nanoporous host (a catalyst in its own right). The project consisted of four major tasks as follows: (1) synthesis of the nanoparticles of zeolite Y (of various chemical compositions) using various techniques such as the addition of organic additives to conventional zeolite Y synthesis mixtures to suppress zeolite Y crystal growth; (2) synthesis of nanoporous silicate host materials of up to 30 nm pore diameter, using poly (alkylene oxide) copolymers which when removed will yield a mesoporous material; (3) synthesis of zeolite Y/Nanoporous Host composite materials as potential catalysts; and (4) evaluation of the catalyst for the upgrading of heavy petroleum feedstocks.

  14. Neutrons at April 15, 2015Rob Dimeo, NCNR Director

    E-Print Network [OSTI]

    Dimeo, Robert M.

    thermal shield cooling system Instrumentation and control upgrades Replaced primary storage tank pumps, etc... #12;secondary cooling pump building electrical substation thermal shield cooling system pool

  15. Scholarly Communications Project, University Libraries, Virginia Tech 1 Electronic Theses & Dissertations

    E-Print Network [OSTI]

    Beex, A. A. "Louis"

    Scholarly Communications Project, University Libraries, Virginia Tech 1 ETDs Electronic Theses & Dissertations Library Issues and Responsibilities Gail McMillan director, Scholarly Communications Project, University Libraries http://scholar.lib.vt.edu Virginia Polytechnic Institute and State University March 6

  16. Production and Testing Experience with the SRF Cavities for the CEBAF 12 GeV Upgrade

    SciTech Connect (OSTI)

    A. Burrill, G.K. Davis, F. Marhauser, C.E. Reece, A.V. Reilly, M. Stirbet

    2011-09-01

    The CEBAF recirculating CW electron linear accelerator at Jefferson Lab is presently undergoing a major upgrade to 12 GeV. This project includes the fabrication, preparation, and testing of 80 new 7-cell SRF cavities, followed by their incorporation into ten new cryomodules for subsequent testing and installation. In order to maximize the cavity Q over the full operable dynamic range in CEBAF (as high as 25 MV/m), the decision was taken to apply a streamlined preparation process that includes a final light temperature-controlled electropolish of the rf surface over the vendor-provided bulk BCP etch. Cavity processing work began at JLab in September 2010 and will continue through December 2011. The excellent performance results are exceeding project requirements and indicate a fabrication and preparation process that is stable and well controlled. The cavity production and performance experience to date will be summarized and lessons learned reported to the community.

  17. Greenbelt Homes Pilot Program: Summary of Building Envelope Retrofits, Planned HVAC Equipment Upgrades, and Energy Savings

    SciTech Connect (OSTI)

    Wiehagen, J.; Del Bianco, M.; Mallay, D.

    2015-05-01

    In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a decade-long community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. It presents a unique opportunity to evaluate and prioritize the wide-range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects to include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy savings benefits of improvements.

  18. CONSTRUCTION ALERT Additional Notice to Ongoing Project

    E-Print Network [OSTI]

    CONSTRUCTION ALERT Additional Notice to Ongoing Project TO: Deans, Directors, Chairpersons: November 28 to December 1, 2011 HOURS OF CONSTRUCTION: 6:30 a.m. to 9:30 a.m. ACCESSIBLE ROUTES: No accessible routes will be affected. ADVISORY: All persons in the vicinity of this construction project

  19. Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Public Interest Energy Research (PIER) Program FINAL Energy Efficiency Research Office Laurie ten Hope Deputy Director RESEARCH AND DEVELOPMENT DIVISION research for the Efficiency Characteristics and Opportunities for New California Homes project. John

  20. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT NOVEMBER 2010 CEC5002013048 Manager Energy Generation Research Office Laurie ten Hope Deputy Director Energy Research and Development Commission Energy Research and Development Division supports public interest energy research and development

  1. Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT DESIGN AND DEVELOPMENT Energy Efficiency Research Office Laurie ten Hope Deputy Director RESEARCH AND DEVELOPMENT DIVISION Interest Energy Research Program, Sol Focus, and the United Technologies Research Center). Authors

  2. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT Technology Systems Research Office Laurie ten Hope Deputy Director ENERGY RESEARCH AND DEVELOPMENT DIVISION Robert P Research Center and funded by the California Energy Commission (Energy Commission), Public Interest Energy

  3. Human Resource Directors (HRD) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuelsof Energy ServicesContractingManagement » Human Resource Directors (HRD)

  4. ATLAS Muon Spectrometer Upgrades for the High Luminosity LHC

    E-Print Network [OSTI]

    Valderanis, Chrysostomos; The ATLAS collaboration

    2015-01-01

    ATLAS Muon Spectrometer Upgrades for the High Luminosity LHC The luminosity of the LHC will increase up to 2x10^34 cm-2s-1 after the long shutdown in 2019 (phase-1 upgrade) and up to 7x10^34 cm-2s-1 after the long shutdown in 2025 (phase-2 upgrade). In order to cope with the increased particle fluxes, upgrades are envisioned for the ATLAS muon spectrometer. At phase-1, the current innermost stations of the ATLAS muon endcap tracking system (the Small Wheels) will be upgraded with 2x4-layer modules of Micromega detectors, sandwiched by two 4 layer modules of small strip Thin Gap Chambers on either side. Each 4-layer module of the so-called New Small Wheels covers a surface area of approximately 2 to 3 m2 for a total active area of 1200 m2 each for the two technologies. On such large area detectors, the mechanical precision (30 \\mu m along the precision coordinate and 80 \\mu m along the beam) is a key point and must be controlled and monitored along the process of construction and integration. The design and re...

  5. Project Reports for Central Council of the Tlingit and Haida Indian Tribes of Alaska: Tlingit and Haida Regional Housing Authority- 2011 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Tlingit and Haida Regional Housing Authority (THRHA) will conduct a three-year project to provide energy efficiency audits, energy monitoring, energy usage assessments, and energy conservation proposed upgrades for approximately 51 low-income, multifamily residences (292 units) in 14 southeast Alaska communities and rural communities with extremely high energy costs; identify funding options for potential energy upgrades, if found to be viable, to implement the resultant project.

  6. Upgrade Strategies for the Proton Synchrotron Booster Dump at CERN

    E-Print Network [OSTI]

    Sarrio Martinez, A; Maglioni, C

    2012-01-01

    CERN’s LHC Injection chain Upgrade (LIU) involves a revision of the Proton Synchrotron Booster dump, which was designed in the 1960’s to cope with beam energies reaching 800 MeV and intensities of 1e+13 particles per pulse. Thermo-mechanical studies highlighted the need for an upgrade of the dump, so that it is capable of withstanding energies in the order of 2 GeV and intensities up to 1e+14 particles per pulse. This paper proposes a new design of the dump in the light of various constraints and choices such as the geometry, materials and the integration of the required cooling system. Further topics discussed include the strategy for dismantling the old device, which has been continuously irradiated for almost 40 years and presents a difficult access. Therefore, a detailed ALARA procedure is being prepared in order to carry out the upgrade works in the area.

  7. Reactive plasma upgrade of squalane - a heavy oil simulant

    SciTech Connect (OSTI)

    Kong, P.C.; Watkins, A.D.; Detering, B.A.; Thomas, C.P.

    1995-10-01

    U.S. light crude oil production has steadily declined over the last two decades. However, huge known heavy oil deposits in the North American continent remain largely untapped. In the past 10 years, the API gravity of crude oils has been decreasing by about 0.17% per year, and the sulfur content has been increasing by about 0.027% per year. As the API gravity of crude oil decreases, there will be an urgent need for economically viable new technologies to upgrade the heavy oil to a high API gravity feed stock for the refineries. The Idaho National Engineering Laboratory is investigating an innovative plasma process to upgrade heavy oil and refinery residuum. This paper will present some of the results and the implications of this technology for heavy oil upgrade and conversion.

  8. Research Laboratory Experiments with Energy Efficiency Upgrades |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Financing Tool FitsProject DevelopsforReporting OccupationalPower Generation Systems Using

  9. DOE Hanford Network Upgrades and Disaster Recovery Exercise Support the Cleanup Mission Now and into the Future

    SciTech Connect (OSTI)

    Eckman, Todd J.; Hertzel, Ali K.; Lane, James J.

    2013-11-07

    In 2013, the U.S. Department of Energy's (DOE) Hanford Site, located in Washington State, funded an update to the critical network infrastructure supporting the Hanford Federal Cloud (HFC). The project, called ET-50, was the final step in a plan that was initiated five years ago called "Hanford's IT Vision, 2015 and Beyond." The ET-50 project upgraded Hanford's core data center switches and routers along with a majority of the distribution layer switches. The upgrades allowed HFC the network intelligence to provide Hanford with a more reliable and resilient network architecture. The culmination of the five year plan improved network intelligence and high performance computing as well as helped to provide 10 Gbps capable links between core backbone devices (10 times the previous bandwidth). These improvements allow Hanford the ability to further support bandwidth intense applications, such as video teleconferencing. The ET-50 switch upgrade, along with other upgrades implemented from the five year plan, have prepared Hanford's network for the next evolution of technology in voice, video, and data. Hand-in-hand with ET-50's major data center outage, Mission Support Alliance's (MSA) Information Management (IM) organization executed a disaster recovery (DR) exercise to perform a true integration test and capability study. The DR scope was planned within the constraints of ET-50's 14 hour datacenter outage window. This DR exercise tested Hanford's Continuity of Operations (COOP) capability and failover plans for safety and business critical Hanford Federal Cloud applications. The planned suite of services to be tested was identified prior to the outage and plans were prepared to test the services ability to failover from the primary Hanford data center to the backup data center. The services tested were: Core Network (backbone, firewall, load balancers); Voicemail; Voice over IP (VoIP); Emergency Notification; Virtual desktops; and, Select set of production applications and data. The primary objective of the exercise was to test COOP around the emergency operations at Hanford to provide information on capabilities and dependencies of the current system to insure improved focus of emergency, safety and security capacity in a disaster situation. The integration of the DR test into the ET-50 project allowed the testing of COOP at Hanford and allowed the lessons learned to be defined. These lessons learned have helped improve the understanding of Hanford's COOP capabilities and will be critical for future planning. With the completion of the Hanford Federal Cloud network upgrades and the disaster recovery exercise, the MSA has a clearer path forward for future technology implementations as well as network improvements to help shape the usability and reliability of the Hanford network in support of the cleanup mission.

  10. Janus Upgrade using brewster angle disk amplifier technology. [Janus laser system

    SciTech Connect (OSTI)

    Hunt, J.; Boben, R.; Blocker, R.; Clark, J.; Henesian, M.; Victoria, J.; Mayo, S.; Patton, H.; Pedersen, K.; Strange, N.; Swain, J.

    1990-10-24

    The Nuclear Test and Experimental Science Program (NTES) has requested that the Laser Program design and price an upgrade to the Janus laser system (JANUS UPGRADE) capable of reliably delivering in excess of 200 joules per beamline in a range of pulse forms to three experiment areas. The facility is to have the following characteristics: three experiment areas, two high energy beams, each with 200--400 joule/1 ns at a wavelength of 1.053 or 1.064 microns, and 125--250 J/1 ns when frequency doubled, one probe beam (0.1 J rated at 30 ps) to be used for interferometry, and reliable operation. The proposed facility would occupy approximately 5600 ft{sup 2} and be located in the Bldg. 174 complex. A block diagram of the entire facility is shown in Fig. 1. The facility is further defined by the Work Breakdown Structure (also shown in Fig. 1). The main elements of the WBS are the conventional facility and modifications thereof (WBS 1), special equipment (WBS 2), the laser (WBS 3), the experiment areas (WBS 4), the controls and data acquisition system (WBS 5), and the project integration (WBS 6). The experiment area has three target chambers and uses diagnostic hardware now in Janus. 12 figs., 4 tabs.

  11. Reactor control system upgrade for the McClellan Nuclear Radiation Center

    E-Print Network [OSTI]

    Power, Michael A.

    1999-01-01

    a new reactor control system for the McClellan NuclearI REACTOR CONTROL SYSTEM UPGRADE FOR THE McCLELLAN NUCLEARReactor Control System Upgrade for the McClellan Nuclear

  12. Hopper OS upgrade and new SW set to default next Wed, Feb 27

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OS upgrade and new SW set to default next Wed, Feb 27 Hopper OS upgrade and new SW set to default next Wed, Feb 27 February 21, 2013 by Helen He (0 Comments) 1) There will be a...

  13. Building Value with Energy-Saving Upgrades in Homes and Businesses...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building Value with Energy-Saving Upgrades in Homes and Businesses Building Value with Energy-Saving Upgrades in Homes and Businesses July 12, 2011 - 10:09am Addthis Eric Barendsen...

  14. CONSTRUCTION NOTICE SUPPLEMENT Additional Notice to Ongoing Project

    E-Print Network [OSTI]

    CONSTRUCTION NOTICE SUPPLEMENT Additional Notice to Ongoing Project TO: Deans, Directors on the roof to June 30, 2011. DURATION OF PROJECT: May 21, 2011 to June 30, 2011 HOURS OF CONSTRUCTION: Monday persons in the vicinity of this construction project are advised to respect all construction barricades

  15. Energy Upgrade California in Los Angeles County, Loan Loss Reserve Fund Agreement

    Broader source: Energy.gov [DOE]

    Energy Upgrade California in Los Angeles County, Loan Loss Reserve Fund Agreement. Example of loan loss reserve agreement.

  16. Standard Work Specifications for Single-Family Home Energy Upgrades Summary (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-11-01

    The U.S. Department of Energy (DOE), the National Renewable Energy Laboratory (NREL) and numerous industry stakeholders developed the Standard Work Specifications for Single-Family Home Energy Upgrades to define the minimum requirements for high-quality residential energy upgrades. Today, the Standard Work Specifications provide a unique source for defining high-quality home energy upgrades, establishing clear expectations for homeowners, contractors, trainers, workers, program administrators, and organizations that provide financing for energy upgrades.

  17. Written Testimony of Wes Kelley Executive Director Columbia Power...

    Broader source: Energy.gov (indexed) [DOE]

    facing distribution utilities, especially with the advent and rapid growth of distributed energy resources (DERs). My name is Wes Kelley, and I serve as the Executive Director of...

  18. Christoph W. Leemann Named Jefferson Lab Director | Jefferson...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National Laboratory where he had been involved in the design and construction of high-energy accelerators since 1970. "As the new Jefferson Lab director Christoph Leemann will...

  19. MEMORANDUM FROM: THOMAS E. BROWN, DIRECTOR OFFICE OF CONTRACT...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ,2008 MEMORANDUM FROM: THOMAS E. BROWN, DIRECTOR OFFICE OF CONTRACT MANAGEMENT OFFICE OF PROCUREMENT AND ASSISTANCE MANAGEMENT SUBJECT: Contract Change Order Administration of...

  20. Weerts to lead Physical Sciences and Engineering directorate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weerts to lead Physical Sciences and Engineering directorate By Lynn Tefft Hoff * August 10, 2015 Tweet EmailPrint Hendrik (Harry) Joseph Weerts has been named the associate...

  1. Update from the Director: David Conrad | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Addthis Related Articles Senior Advisor for Environmental Management David Huizenga, center, speaks with Pilar Thomas, deputy director of the Office of Indian...

  2. EM Announces New Director of Office of External Affairs

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – EM has announced that Paul Seidler has joined EM as the Director of the Office of External Affairs.

  3. United States Department of the Interior - Directors Order 53...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: United States Department of the Interior - Directors Order 53 - Special Park...

  4. Motion of Robert G. Burnley, Director the Commonwealth of Virginia...

    Broader source: Energy.gov (indexed) [DOE]

    Robert G. Burnley, Director the Commonwealth of Virginia Department of Environmental Quality to Deny the District of Columbia Public Service Commission's Petition on the Grounds...

  5. BOARD OF DIRECTORS UNIVERSITY OF CONNECTICUT HEALTH CENTER

    E-Print Network [OSTI]

    BOARD OF DIRECTORS OF THE UNIVERSITY OF CONNECTICUT HEALTH CENTER FINANCE CORPORATION June 30, 2014. REVIEW AND APPROVAL OF LEASES: CONNECTICUT CHILDREN'S MEDICAL CENTER* HARVEY AND LEWIS OPTICIANS

  6. US Energy Secretary Samuel Bodman and Russian Atomic Energy Director...

    Energy Savers [EERE]

    Bratislava Agreement May 24, 2005 - 12:51pm Addthis US Energy Secretary Samuel Bodman (right) and Russian Atomic Energy Director Alexander Rumyantsev discuss progress in...

  7. Director's colloquium March 18 large hadron collider

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would like submit theCovalentLaboratory | National Nuclear SecurityDirector's colloquium large

  8. NPS Director's Order | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI Ventures Ltd Jump to: navigation, search Name: NPI Ventures LtdDirector's

  9. Director's Discretionary (DD) Program | Argonne Leadership Computing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation Current HAB PacketDiesel pricesCenter at Cornell Director

  10. Procurement Director | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeedingProgramExemptions | NationalProcurement Director Department: Procurement

  11. Director's Office | Stanford Synchrotron Radiation Lightsource

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory ofDid you not find what you were lookingAboutDirector

  12. Message from the Director | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass map shines light on dark matter ByMentor-ProtegeFrom the Director Here at Argonne,

  13. Project Year Project Team

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    the centrality of live theater in twentieth- century American culture. Furthermore, the present political climate, it will treat other moments in which writers, directors, producers, and actors used theater as a form of political protest. Among the topics are radical theater in the 1930s, the influence of German émigrés

  14. Aalborg Universitet Reactive Power Support of Electrical Vehicle Charging Station Upgraded with Flywheel

    E-Print Network [OSTI]

    Vasquez, Juan Carlos

    Aalborg Universitet Reactive Power Support of Electrical Vehicle Charging Station Upgraded of Electrical Vehicle Charging Station Upgraded with Flywheel Energy Storage System," in Proc. IEEE PowerTech, 2015. Reactive Power Support of Electrical Vehicle Charging Station Upgraded with Flywheel Energy

  15. Investment and Upgrade in Distributed Generation under Uncertainty

    E-Print Network [OSTI]

    Guillas, Serge

    for microgrids to use small-scale distributed generation (DG) and combined heat and power (CHP) applications via.maribu@ensmp.fr 1 #12;Investment and Upgrade under Uncertainty in Distributed Generation 2 Keywords: Combined heat heat exchangers (HXs) to meet local energy loads. Although the electric-only efficiency of DG is lower

  16. THE TCS UPGRADE: DESIGN, CONSTRUCTION, CONDITIONING, AND ENHANCED RMF FRC

    E-Print Network [OSTI]

    Washington at Seattle, University of

    , with relatively low ~by FRC standards! megawatt-level RMF input powers. After initial forma- tion, the plasmaTHE TCS UPGRADE: DESIGN, CONSTRUCTION, CONDITIONING, AND ENHANCED RMF FRC PERFORMANCE K. E. MILLER. MILROY, Z. A. PIETRZYK, and G. C. VLASSES University of Washington Redmond Plasma Physics Laboratory

  17. Technologies for Upgrading Light Water Reactor Outlet Temperature

    SciTech Connect (OSTI)

    Daniel S. Wendt; Piyush Sabharwall; Vivek Utgikar

    2013-07-01

    Nuclear energy could potentially be utilized in hybrid energy systems to produce synthetic fuels and feedstocks from indigenous carbon sources such as coal and biomass. First generation nuclear hybrid energy system (NHES) technology will most likely be based on conventional light water reactors (LWRs). However, these LWRs provide thermal energy at temperatures of approximately 300°C, while the desired temperatures for many chemical processes are much higher. In order to realize the benefits of nuclear hybrid energy systems with the current LWR reactor fleets, selection and development of a complimentary temperature upgrading technology is necessary. This paper provides an initial assessment of technologies that may be well suited toward LWR outlet temperature upgrading for powering elevated temperature industrial and chemical processes during periods of off-peak power demand. Chemical heat transformers (CHTs) are a technology with the potential to meet LWR temperature upgrading requirements for NHESs. CHTs utilize chemical heat of reaction to change the temperature at which selected heat sources supply or consume thermal energy. CHTs could directly utilize LWR heat output without intermediate mechanical or electrical power conversion operations and the associated thermodynamic losses. CHT thermal characteristics are determined by selection of the chemical working pair and operating conditions. This paper discusses the chemical working pairs applicable to LWR outlet temperature upgrading and the CHT operating conditions required for providing process heat in NHES applications.

  18. Progress in MPC and A upgrades at Luch

    SciTech Connect (OSTI)

    Mizin, P.; Chukov, V.; Rogatchev, V. [Gosudarstvennyj Nauchno-Issledovatel`skij Inst. NPO Luch, Podol`sk (Russian Federation); Curtiss, J. [Brookhaven National Lab., Upton, NY (United States); Erkkila, B. [Los Alamos National Lab., NM (United States); Goodey, K. [Pacific Northwest National Lab., Richland, WA (United States); Hembree, D. Jr. [Oak Ridge National Lab., TN (United States); Lowe, D. [Sandia National Labs., Albuquerque, NM (United States); Turner, C. [Lawrence Livermore National Lab., CA (United States)

    1997-09-01

    Luch, a MINATOM facility, has been engaged in both scientific research and uranium processing for fifty years. Since the spring of 1996, Luch has participated in a program of US/Russia Cooperation in Nuclear MPC and A Upgrades. The program began with planning for immediate upgrades in MPC and A, with en emphasis on physical protection. In addition, US and Luch experts exchanged technical data during a number of workshops, to establish a common understanding of available MPC and A tools and equipment. Site characterizations and vulnerability assessments were then prepared by Luch, to form the basis for the current program of methodical upgrades in all areas of MPC and A. Access control, alarms and alarm communications are being improved as part of this program. Control of nuclear material is being enhanced through improvements in material monitoring and in transportation security when nuclear material is moved between buildings on the Luch site. A comprehensive, site-wide computer network for Luch was designed during a recent workshop. Acquiring and installing this computer system, complete with COREMAS software, is currently in progress. Nuclear material analysis will be improved through NDA techniques using Canberra InSpector systems. The planned upgrades in nuclear MPC and A will reinforce safeguards over large quantities of HEU at Luch.

  19. A THEORY UPGRADE FOR RHIC: Towards a Quantitative Understanding of

    E-Print Network [OSTI]

    Gustafsson, Torgny

    is of an enabling nature, comparable to the construction and upgrades of facilities and instruments which enable #12;I. The Challenge The RHIC facility provides a unique environment for studying QCD bulk matter, suggesting a strongly coupled medium. Third, large domains in parameter space for the equation of state have

  20. Automating Database Schema Evolution in Information System Upgrades

    E-Print Network [OSTI]

    Zaniolo, Carlo

    Automating Database Schema Evolution in Information System Upgrades Carlo Curino Hyun J. Moon Carlo, and down-time currently created by the database schema evolution process is the source of incessant prob and historical queries for database archives under schema evolution. Keywords Schema Evolution, Database Design

  1. Version 3 June 20, 2015 NSTX Upgrade Program Letter

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Innovative Diagnostics for FY 2016-2018 Introduction This NSTX Upgrade (NSTX-U)1 Program Letter provides for reducing cost, risk, and development time for practical fusion energy. The ST appears particularly, with its unique properties, thus extends and complements the higher aspect ratio, lower T tokamak

  2. MAINTENANCE, UPGRADE AND VERIFICATION OF OPERATIONAL FORECASTS OF

    E-Print Network [OSTI]

    MAINTENANCE, UPGRADE AND VERIFICATION OF OPERATIONAL FORECASTS OF CLOUD COVER AND WATER VAPOUR Purchase Order 58311/ODG/99/8362/GWI/LET #12;i PREFACE Starting in August 1998, operational forecasts satellite imagery from the Co-operative Institute for Research in the Atmosphere (CIRA) and upper

  3. COCONUT Deliverable D13 Upgraded State of the Art

    E-Print Network [OSTI]

    Schichl, Hermann

    COCONUT Deliverable D13 Upgraded State of the Art Techniques Implemented as Modules July 29, 2003 manual of the COCONUT API Version 2. 2. Name changes #15; In inference engines model was renamed to wnode was taken out of semantics.h and put into the new header #12;le coconut types.h. 4. Additional features Some

  4. COCONUT Deliverable D13 Upgraded State of the Art

    E-Print Network [OSTI]

    Schichl, Hermann

    COCONUT Deliverable D13 Upgraded State of the Art Techniques Implemented as Modules July 29, 2003 of the COCONUT API Version 2. 2. Base class There are four di#11;erent base classes for evaluator programming been implemented in the COCONUT API version 2. In the following I will give a short description of all

  5. RHIC Operation and Plans for Upgrades Wolfram Fischer

    E-Print Network [OSTI]

    Ã? design 10Ã? achieved #12;Wolfram Fischer 7 Achieved parameters Mode No of bunches Ions/bunch [ 1 0 9] enhanced luminosity 60e9 Au intensity design luminosity Beamexperiments #12;Wolfram Fischer 10 RHIC Run-41 RHIC Operation and Plans for Upgrades Wolfram Fischer C-AD Machine Advisory Committee Meeting 10

  6. Post Production Heavy Oil Operations: A Case for Partial Upgrading 

    E-Print Network [OSTI]

    Lokhandwala, Taher

    2012-12-05

    The transportation of heavy oil is a pressing problem. Various methods have been devised to mitigate the reluctance to flow of these highly dense and viscous oils. This study is focused on evaluating a case for post-production partial upgrading...

  7. SEWAGE LAGOON DESIGN USING WETLANDS AND OTHER UPGRADING TECHNOLOGIES

    E-Print Network [OSTI]

    that a total ammonia concentration of 5 mg/L-N be used as a design criteria. In additionto presenting design#12;L L llF L L L SEWAGE LAGOON DESIGN USING WETLANDS AND OTHER UPGRADING TECHNOLOGIES TO ACHIEVE effluents are typically non-toxic. Using an arbitrary factor of safety of two, it is recommended

  8. Low rank coal upgrading in a flow of hot water

    SciTech Connect (OSTI)

    Masato Morimoto; Hiroyuki Nakagawa; Kouichi Miura

    2009-09-15

    Simultaneous hydrothermal degradation and extraction at around 350{sup o}C using flowing solvent as a reaction/extraction medium were proposed for upgrading brown coal, more specifically, for converting brown coal into several fractions having different molecular weight and chemical structure under mild conditions. When an Australian brown coal, Loy Yang coal, was treated by water at 350{sup o}C under 18 MPa, the coal was separated into four fractions: gaseous product by 8% yield, water-soluble extract at room temperature (soluble) by 23% yield, extract precipitates as solid at room temperature (deposit) by 23% yield, and residual coal (upgraded coal) by 46% yield on daf basis. The separation was found to be realized by in situ extraction of low-molecular-weight substances released from coal macromolecular structure and/or those generated by hydrothermal decomposition reactions at 350{sup o}C. The solid products obtained, deposit and upgraded coal, were characterized in detail to examine the possibility of their effective utilization as solid fuel and chemical feed stock. The upgraded coal showed higher heating value and higher gasification reactivity than the parent coal, indicating that the upgraded coal can be a better solid fuel than the parent coal. The solid extract, deposit, was found to show thermoplasticity at less than 200{sup o}C, suggesting the possibility of utilizing the deposit as a raw material of high performance carbon materials. Several variables affecting the performance of the proposed method are also examined in detail in this paper. 12 refs., 8 figs., 3 tabs.

  9. Upgrade of the ATLAS Control and Configuration Software for Run 2

    E-Print Network [OSTI]

    Avolio, Giuseppe; The ATLAS collaboration; Anders, Gabriel; Caprini, Mihai; Corso-Radu, Alina; D'ascanio, Matteo; De Castro Vargas Fernandes, Julio; Dova, Maria-Teresa; Kazarov, Andrei; Klopov, Nikolai; Kolobara, Bernard; Kotov, Vladislav; Lankford, Andrew; Laurent, Florian; Lehmann Miotto, Giovanna; Magnoni, Luca; Olechko, Serguei; Papaevgeniou, Lykourgos; Ryabov, Yury; Santos, Alejandro; Scannicchio, Diana; Seixas, Jose; Soloviev, Igor; Unel, Gokhan; Yasu, Yoshiji

    2015-01-01

    The ATLAS data acquisition (DAQ) system is controlled and configured via a software infrastructure that takes care of coherently orchestrating the data taking. While the overall architecture, established at the end of the 90’s, has proven to be solid and flexible, many software components have undergone a complete redesign or re-implementation in 2013/2014 in order to fold-in the additional requirements that appeared in the course of LHC’s Run 1, to profit from new technologies and to re-factorise and cleanup software. This paper describes the approach that was taken to plan, organise and carry out this software upgrade project. It highlights the main technical choices that have guided the overall work, describes the major achievements and outlines how the control and configuration software may be further improved or re-shaped in the future.

  10. JLab High Efficiency Klystron Baseline Design for 12 GeV Upgrade

    SciTech Connect (OSTI)

    Hovater, J.; Delayen, Jean; Harwood, Leigh; Nelson, Richard; Wang, Haipeng

    2003-05-01

    A computer design of a 13.5 kW, 1497 MHz, CW type, 55% efficiency, 0.8 microPv beam perveance, ~40 dB gain, 5-cavity klystron has been developed for JLab 12 GeV Upgrade project.The design uses TRICOMP codes to simulate the gun, mod-anode section, solenoid focus channel and beam dump. The klystron tube was designed by JPNDISK (1D) code initially and then optimized by MASK (2D) code for the baseline parameters. All of these codes have been bunch marked by JLab 5 kW operational klystrons. The details of design parameters and the simulations by MAFIA (3D) for the cavity couplings tuners, and window are also going to be presented.

  11. Operational Status and Power Upgrade Prospects of the Neutrino Experimental Facility at J-PARC

    E-Print Network [OSTI]

    Taku Ishida; for the T2K Beam Group

    2015-03-08

    In order to explore CP asymmetry in the lepton sector, a power upgrade to the neutrino experimental facility at J-PARC is a key requirement for both the Tokai to Kamioka (T2K) long-baseline neutrino oscillation experiment and a future project with Hyper-Kamiokande. Based on five years of operational experience, the facility has achieved stable operation with 230 kW beam power without significant problems on the beam-line apparatus. After successful maintenance works in 2013-2014 to replace all electromagnetic horns and a production target, the facility is now ready to accomodate a 750-kW-rated beam. Also, the possibility of achieving a few to multi-MW beam operation is discussed in detail.

  12. SRF CAVITY PERFORMANCE OVERVIEW FOR THE 12 GeV UPGRADE

    SciTech Connect (OSTI)

    A. Burrill, G.K. Davis, C.E. Reece, A.V. Reilly, M. Stirbet

    2012-07-01

    The CEBAF accelerator, a recirculating CW electron accelerator that is currently operating at Jefferson Laboratory, is in the process of having 10 new cryomodules installed to allow for the maximum beam energy to be increased from 6 GeV to 12 GeV. This upgrade required the fabrication, processing and RF qualification of 80, seven cell elliptical SRF cavities, a process that was completed in February 2012. The RF performance achieve in the vertical testing dewars has exceeded the design specification by {approx}25% and is a testament to the cavity design and processing cycle that has been implemented. This paper will provide a summary of the cavity RF performance in the vertical tests, as well as review the overall cavity processing cycle and duration for the project.

  13. NSTX Upgrade Umbrella Arch and Foot Reinforcements, Local Dome Details 1 | P a g e NSTX Upgrade

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    clevis restraint/support. Calculation (Calculation is either documented here or attached) Attached was accomplished.) With recommended reinforcements, the 3/4 inch 316 bolts are acceptable for the upgrade loads in strength by integrating it with the TF strap support. Cognizant Engineer's printed name, signature

  14. FY 2007-09 Project Selection, Section 10 1 Project ID: 1991-019-01

    E-Print Network [OSTI]

    , culvert upgrades, road recontouring, riparian revegetation, off-channel watering, grazing exclusion Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage

  15. Samuel E. Bevins, PE DIRECTOR, NAVY CRANE CENTER

    E-Print Network [OSTI]

    Samuel E. Bevins, PE DIRECTOR, NAVY CRANE CENTER NAVAL FACILITIES ENGINEERING COMMAND Mr. Samuel E. (Sam) Bevins is currently serving as Director of the Navy Crane Center. He joined NAVFAC in the Senior Executive Service in May 1998, after over 30 years with Newport News Shipbuilding (NNS). The Navy Crane

  16. Office of Transportation and Air Quality Christopher Grundler, Office Director

    E-Print Network [OSTI]

    Technology Assessment Center Dennis Johnson Transportation and Climate Division Karl Simon, Director Michael Management Center Fidel Galano National Center for Advanced Technology Dan Barba Testing Services Center Brian Nelson Testing and Advanced Technology Division David Haugen, Director Matt Brusstar, DD Erica

  17. Project X functional requirements specification

    SciTech Connect (OSTI)

    Holmes, S.D.; Henderson, S.D.; Kephart, R.; Kerby, J.; Kourbanis, I.; Lebedev, V.; Mishra, S.; Nagaitsev, S.; Solyak, N.; Tschirhart, R.; /Fermilab

    2012-05-01

    Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility is designed to support programs in elementary particle and nuclear physics, with possible applications to nuclear energy research. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions, and to assure that the facility is designed with sufficient upgrade capability to provide U.S. leadership for many decades to come. This paper will briefly review the previously described Functional Requirements, and then discuss their recent evolution.

  18. Project X functional requirements specification

    E-Print Network [OSTI]

    Holmes, S D; Kephart, R; Kerby, J; Kourbanis, I; Lebedev, V; Mishra, S; Nagaitsev, S; Solyak, N; Tschirhart, R

    2012-01-01

    Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility is designed to support programs in elementary particle and nuclear physics, with possible applications to nuclear energy research. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions, and to assure that the facility is designed with sufficient upgrade capability to provide U.S. leadership for many decades to come. This paper will briefly review the previously described Functional Requirements, and then discuss their recent evolution.

  19. Carolyn Bliss, PhD Jeff Webb, PhD Carolan Ownby, PhD Director of LEAP Associate Director of LEAP Assistant Director of LEAP

    E-Print Network [OSTI]

    Tipple, Brett

    Carolyn Bliss, PhD Jeff Webb, PhD Carolan Ownby, PhD Director of LEAP Associate Director of LEAP 581-3104 Executive Assistant Program Assistant Jennifer Bauman, PhD Ann Engar, PhD Meg Harper, PhD j-Law LEAP Business LEAP Rebecca Larsen, PhD Stephen Maisch, PhD Jennifer Seagrave, PhD r

  20. EA-0930: Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal to expand and upgrade the U.S. Department of Energy's Grand Junction Projects Office facilities and operations in Grand Junction, Colorado.

  1. Project Year Project Team

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    Project Year 2001 Project Team Faculty: Grace Brush, Geography & Environmental Engineering, Whiting School of Engineering Fellow: Dan Bain, Geography & Environmental Engineering, Whiting School. Through this project, the team proposes to develop a variety of resources: a set of general, web

  2. Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway

    SciTech Connect (OSTI)

    Davis, Ryan; Biddy, Mary J.; Jones, Susanne B.

    2013-03-31

    In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline, diesel and jet range hydrocarbon blendstocks.

  3. CMS TECHNICAL DESIGN REPORT FOR THE MUON ENDCAP GEM UPGRADE

    E-Print Network [OSTI]

    Colaleo, A; Sharma, A; Tytgat, M

    2015-01-01

    This report describes both the technical design and the expected performance of the Phase-II upgrade, using Gas Electron Multiplier (GEM) detectors, of the first endcap station of the CMS muon system. The upgrade is targeted for the second long shutdown of the CERN LHC and is designed to improve the muon trigger and tracking performance at high luminosity. The GEM detectors will add redundancy to the muon system in the 1.6 technology to operate in the high radiation environment present in that region. The first muon endcap station will be instrumented with a double layer of triple-GEM chambers in the 1.6 < |?| < 2.2 region. The detector front-end electronics uses the custom designed VFAT3 chip to provide both fast input for the level-1 muon trigger ...

  4. Upgrade of Beam Energy Measurement System at BEPC-II

    E-Print Network [OSTI]

    Jian-Yong Zhang; Xiao Cai; Xiao-Hu Mo; Di-Zhou Guo; Jian-Li Wang; Bai-Qi Liu; M. N. Achasov; A. A. Krasnov; N. Yu. Muchnoi; E. E. Pyata; E. V. Mamoshkina; F. A. Harris

    2015-10-28

    The beam energy measurement system is of great importance and profit for both BEPC-II accelerator and BES-III detector. The system is based on measuring the energies of Compton back-scattered photons. Many advanced techniques and precise instruments are employed to realize the highly accurate measurement of positron/electron beam energy. During five year's running period, in order to meet the requirement of data taking and improve the capacity of measurement itself, the upgradation of system is continued, which involve the component reformation of laser and optics subsystem, replacement of view-port of the laser to vacuum insertion subsystem, the purchase of electric cooling system for high purity germanium detector, and the improvement of data acquisition and processing subsystem. The upgrading of system guarantees the smooth and efficient measuring of beam energy at BEPC-II and accommodates the accurate offline energy values for further physics analysis at BES-III.

  5. Upgrade of Beam Energy Measurement System at BEPC-II

    E-Print Network [OSTI]

    Zhang, Jian-Yong; Mo, Xiao-Hu; Guo, Di-Zhou; Wang, Jian-Li; Liu, Bai-Qi; Achasov, M N; Krasnov, A A; Muchnoi, N Yu; Pyata, E E; Mamoshkina, E V; Harris, F A

    2015-01-01

    The beam energy measurement system is of great importance and profit for both BEPC-II accelerator and BES-III detector. The system is based on measuring the energies of Compton back-scattered photons. Many advanced techniques and precise instruments are employed to realize the highly accurate measurement of positron/electron beam energy. During five year's running period, in order to meet the requirement of data taking and improve the capacity of measurement itself, the upgradation of system is continued, which involve the component reformation of laser and optics subsystem, replacement of view-port of the laser to vacuum insertion subsystem, the purchase of electric cooling system for high purity germanium detector, and the improvement of data acquisition and processing subsystem. The upgrading of system guarantees the smooth and efficient measuring of beam energy at BEPC-II and accommodates the accurate offline energy values for further physics analysis at BES-III.

  6. The start-up of the bi-provincial upgrader

    SciTech Connect (OSTI)

    Chase, S. [Husky Oil Operations Ltd., Calgary, Alberta (Canada)

    1995-12-31

    The Bi-Provincial Upgrader is a $1.63 x 10{sup 9} Cdn grass-roots heavy oil upgrading facility located near Lloydminster, Saskatchewan. The facility, which started operation in August 1992, is designed to produce 7300 m{sup 3}/day of 34{degrees}API synthetic crude from 11-15{degrees}API heavy crude oils. The start-up and initial operation of the facility has been a technical success. The facility reached design capacity in a much shorter time than typically reported for the start-up of similar units and has operated reliably at better than design capacity. In this paper, the plant operating performance is reviewed in some detail. A review of the engineering and construction phases and a summary of regional benefits is also included.

  7. Reactive plasma upgrade of squalane - a heavy oil simulant

    SciTech Connect (OSTI)

    Kong, P.C.; Watkins, A.D.; Detering, B.A. [Idaho National Engineering Lab., Idaho Falls, ID (United States)] [and others

    1995-07-01

    U.S. light crude oil production has steadily declined over the last two decades. However, huge known heavy oil deposits in the North American continent remain largely untapped. In the past 10 years, the API gravity of crude oils has been decreasing by about 0.17% per year, and the sulfur content has been increasing by about 0.027% per year. As the API gravity of crude oil decreases, there will be an urgent need for economically viable new technologies to ungrade the heavy oil to a high API gravity feed stock for the refineries. The Idaho National Engineering Laboratory is investigating an innovative plasma process to upgrade heavy oil and refinery residuum. This paper will present some of the results and the implications of this technology for heavy oil upgrade and conversion.

  8. Detector and System Developments for LHC Detector Upgrades

    E-Print Network [OSTI]

    Mandelli, Beatrice; Guida, Roberto; Rohne, Ole; Stapnes, Steinar

    2015-05-12

    The future Large Hadron Collider (LHC) Physics program and the consequent improvement of the LHC accelerator performance set important challenges to all detector systems. This PhD thesis delineates the studies and strategies adopted to improve two different types of detectors: the replacement of precision trackers with ever increasingly performing silicon detectors, and the improvement of large gaseous detector systems by optimizing their gas mixtures and operation modes. Within the LHC tracker upgrade programs, the ATLAS Insertable B-layer (IBL) is the first major upgrade of a silicon-pixel detector. Indeed the overall ATLAS Pixel Detector performance is expected to degrade with the increase of luminosity and the IBL will recover the performance by adding a fourth innermost layer. The IBL Detector makes use of new pixel and front-end electronics technologies as well as a novel thermal management approach and light support and service structures. These innovations required complex developments and Quality Ass...

  9. Enhancing Earned Value (EV) Analysis Using Project Assessment & Reporting System (PARS II)- Road Show Presentation

    Broader source: Energy.gov [DOE]

    This presentation was provided by the DOE Office of Project Management Oversight and Assessments (formerly DOE Office of Acquisition and Project Management) in January 2013. It is about the Enhancing Earned Value (EV) Analysis Using Project Assessment & Reporting System (PARS II). PARS II is the Department’s official “System of Record” for capital asset project performance information. PARS II uses the same data as maintained in our contractors’ project management systems, so everyone from the Federal Project Director’s staff to the Secretary of Energy will have easy access to the same data.

  10. Systems and Professional Development - David Brown, Director...

    Energy Savers [EERE]

    Workload DOE's Certified Workforce Acquisition Workload The Holy Grail of Contract and Project Management More... Workshop 2015 - BrownSystems & Professional Development.pdf...

  11. ALT-II armor tile design for upgraded TEXTOR operation

    SciTech Connect (OSTI)

    Newberry, B.L. [Univ. of Michigan, Ann Arbor, MI (United States); McGrath, R.T.; Watson, R.D. [Sandia National Labs., Albuquerque, NM (United States); Kohlhaas, W.; Finken, K.H. [Kernforschungsanlage Juelich GmbH (Germany). Inst. fuer Plasmaphysik; Noda, N. [National Inst. for Fusion Science, Nagoya (Japan)

    1994-08-01

    The upgrade of the TEXTOR tokamak at KFA Juelich was recently completed. This upgrade extended the TEXTOR pulse length from 5 seconds to 10 seconds. The auxiliary heating was increased to a total of 8.0 MW through a combination of neutral beam injection and radio frequency heating. Originally, the inertially cooled armor tiles of the full toroidal belt Advanced Limiter Test -- II (ALT-II) were designed for a 5-second operation with total heating of 6.0 MW. The upgrade of TEXTOR will increase the energy deposited per pulse onto the ALT-II by about 300%. Consequently, the graphite armor tiles for the ALT-II had to be redesigned to avoid excessively high graphite armor surface temperatures that would lead to unacceptable contamination of the plasma. This redesign took the form of two major changes in the ALT-II armor tile geometry. The first design change was an increase of the armor tile thermal mass, primarily by increasing the radial thickness of each tile from 17 mm to 20 mm. This increase in the radial tile dimension reduces the overall pumping efficiency of the ALT-II pump limiter by about 30%. The reduction in exhaust efficiency is unfortunate, but could be avoided only by active cooling of the ALT-II armor tiles. The active cooling option was too complicated and expensive to be considered at this time. The second design change involved redefining the plasma facing surface of each armor tile in order to fully utilize the entire surface area. The incident charged particle heat flux was distributed uniformly over the armor tile surfaces by carefully matching the radial, poloidal and toroidal curvature of each tile to the plasma flow in the TEXTOR boundary layer. This geometry redefinition complicates the manufacturing of the armor tiles, but results in significant thermal performance gains. In addition to these geometry upgrades, several material options were analyzed and evaluated.

  12. Providing protection: Agencies receive funding to repair, upgrade dams 

    E-Print Network [OSTI]

    Wythe, Kathy

    2009-01-01

    by Kathy Wythe tx H2O | pg. 26 Providing protection Agencies receive funding to repair, upgrade dams along with local partners, can apply for grant funds, he said. Construction of the dams began through four federal authorizations passed between... 1944 and 1981. Land rights were acquired from landowners, and local agencies constructed the dams with federal money from NRCS (formerly the Soil Conservation Service). Local sponsors?including cities, counties, local soil and water conservation...

  13. Resolution studies and performance evaluation of the LHCb VELO upgrade

    E-Print Network [OSTI]

    Hynds, Daniel Peter McFarlane; Soler, Paul; Parkes, Christopher

    2015-03-25

    The LHCb detector at CERN is scheduled to undergo an upgrade during the second long shutdown of the LHC. As part of this upgrade, the vertex detector (VELO) will be replaced with a new hybrid pixel detector, based on an evolution of the Timepix ASIC. The performance of this detector should improve upon that achieved by the current VELO, in addition to facilitating the complete detector readout at 40 MHz. As part of the preparation for this upgrade, this thesis presents the results of studies carried out on the single hit resolution of silicon hybrid pixel detectors. The development of a particle beam telescope has been carried out to allow these studies, shown to operate with track rates in excess of 45 kHz and with a pointing resolution at the device under test of less than 2 ?m. A wide range of sensor types, thicknesses and resistivities have then been tested under different operating conditions and the results presented, with single hit resolutions varying between 4 ?m and 12 ?m depending on the conditi...

  14. A novel process for upgrading heavy oil emulsions

    SciTech Connect (OSTI)

    Ng, F.T.T.; Rintjema, R.T. [Univ. of Waterloo, Ontario (Canada). Dept. of Chemical Engineering

    1994-12-31

    Canada has extensive reserves of high sulfur heavy oils. These heavy oils are recovered primarily by steam injection techniques. As a result, the heavy oils are obtained as emulsions at well-heads. The heavy oils, being high in sulfur and metals, and low in hydrogen to carbon atomic ratio, require upgrading such as desulfurization and hydrocracking before it can be used in conventional refineries. Conventional emulsion treatment and desulfurization technology require multistage processing. Thus, alternative technologies for processing heavy oil emulsions would be attractive. The authors have recently developed a novel single stage process for upgrading emulsions via activation of water to provide hydrogen in situ for catalytic desulfurization and hydrocracking. Current work is focused on the desulfurization aspect of upgrading, using benzothiophene as the model sulfur compound and molybdic acid as the catalyst. At 340 C and a CO loading pressure of 600 psi, up to 86% sulfur removal was obtained. As well, in situ generated H{sub 2} was found to be more active than externally supplied molecular H{sub 2}. A likely pathway for desulfurization of benzothiophene was via the initial hydrogenation of benzothiophene to dihydrobenzothiophene followed by hydrogenolysis to give ethylbenzene and H{sub 2}S.

  15. Performance of the MAGIC telescopes after the major upgrade

    E-Print Network [OSTI]

    Sitarek, Julian; Colin, Pierre; Mazin, Daniel

    2015-01-01

    MAGIC is a system of two Imaging Atmospheric Cherenkov Telescopes located on the Canary island of La Palma, Spain. During summer 2011 and 2012 it underwent a major upgrade. The main subsystems upgraded were the MAGIC-I camera and its trigger system and the readout system of both telescopes. We use observations of the Crab Nebula taken at low and medium zenith angles to assess the key performance parameters of the MAGIC stereo system. For low zenith angle observations, the standard trigger threshold of the MAGIC telescopes is about 50 GeV. The integral sensitivity for point-like sources with Crab Nebula-like spectra above 220 GeV is (0.66 +/- 0.03)% of Crab Nebula flux in 50 h of observations. The angular resolution, defined as the sigma of a 2-dimensional Gaussian distribution, at energies of a few hundred GeV is below 0.07degree, while the energy resolution is around 16%. We investigate the effect of the systematic uncertainty on the data taken with the MAGIC telescopes after the upgrade. We estimate that th...

  16. Snowflake divertor configuration studies for NSTX-Upgrade

    SciTech Connect (OSTI)

    Soukhanovskii, V A

    2011-11-12

    Snowflake divertor experiments in NSTX provide basis for PMI development toward NSTX-Upgrade. Snowflake configuration formation was followed by radiative detachment. Significant reduction of steady-state divertor heat flux observed in snowflake divertor. Impulsive heat loads due to Type I ELMs are partially mitigated in snowflake divertor. Magnetic control of snowflake divertor configuration is being developed. Plasma material interface development is critical for NSTX-U success. Four divertor coils should enable flexibility in boundary shaping and control in NSTX-U. Snowflake divertor experiments in NSTX provide good basis for PMI development in NSTX-Upgrade. FY 2009-2010 snowflake divertor experiments in NSTX: (1) Helped understand control of magnetic properties; (2) Core H-mode confinement unchanged; (3) Core and edge carbon concentration reduced; and (4) Divertor heat flux significantly reduced - (a) Steady-state reduction due to geometry and radiative detachment, (b) Encouraging results for transient heat flux handling, (c) Combined with impurity-seeded radiative divertor. Outlook for snowflake divertor in NSTX-Upgrade: (1) 2D fluid modeling of snowflake divertor properties scaling - (a) Edge and divertor transport, radiation, detachment threshold, (b) Compatibility with cryo-pump and lithium conditioning; (2) Magnetic control development; and (3) PFC development - PFC alignment and PFC material choice.

  17. DEEP SEA DRILLING PROJECT DATA FILE DOCUMENTS

    E-Print Network [OSTI]

    DEEP SEA DRILLING PROJECT DATA FILE DOCUMENTS Ocean Drilling Program Texas A&M University Technical; however, republication of any portion requires the written consent of the Director, Ocean Drilling Program, Texas A&M University Research Park, 1000 Discovery Drive, College Station, Texas 77840, as well

  18. Microphotonic parabolic light directors fabricated by two-photon lithography

    SciTech Connect (OSTI)

    Atwater, Jackson H; Spinelli, P.; Kosten, Emily D; Parsons, J.; Van Lare, C; Van de Groep, J; Garcia de Abajo, J.; Polman, Albert; Atwater, Harry A.

    2011-01-01

    We have fabricated microphotonic parabolic light directors using two-photon lithography, thin-film processing, and aperture formation by focused ion beam lithography. Optical transmission measurements through upright parabolic directors 22 ?m high and 10 ?m in diameter exhibit strong beam directivity with a beam divergence of 5.6°, in reasonable agreement with ray-tracing and full-field electromagnetic simulations. The results indicate the suitability of microphotonic parabolic light directors for producing collimated beams for applications in advanced solar cell and light-emitting diode designs.

  19. Partnership: the Canadian Journal of Library and Information Practice and Research, vol. 3, no. 1 (2008) The Southern Alberta Information Resources (SAIR) Project

    E-Print Network [OSTI]

    Seldin, Jonathan P.

    2008-01-01

    (2008) The Southern Alberta Information Resources (SAIR) Project Kathy Crewdson President NextLibrary Inc. Ian Dew Consultant NextLibrary Inc. Wendy Osborn Director Southern Alberta Digital Library University of Lethbridge Abstract The Southern Alberta Information Resources (SAIR) Project

  20. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT CALIFORNIA TRANSMISSION CONGESTION, development, and demonstration (RD&D) projects to benefit California. The Energy Research and Development Manager Fernando Pina Office Manager Energy Systems Research Office Laurie ten Hope Deputy Director ENERGY