Powered by Deep Web Technologies
Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Rank Project Name Directorate,  

E-Print Network [OSTI]

Rank Project Name Directorate, Dept/Div and POC Cost Savings Payback (Years) Waste Reduction 1 NATIONAL LABORATORY FY02 Funded Pollution Prevention Projects 0.4 Years (~5 months) #12;

2

Federal Project Directors in  

Broader source: Energy.gov (indexed) [DOE]

appropriate front-end plan- appropriate front-end plan- ning process would help DOE to identify the mission need for the project and aid in iden- tification and evaluation of alternative approaches and assessment of the cost and risks of each. This should lead to a well-defined set of re- quirements and scope of work that form the basis for effec- tive design. Front-end plan- ning in the DOE project man- agement system includes plan- ning procedures from project conception through approval of the performance baseline (CD-2). The Office of Engineering and Construction Management has developed two guides to assist Federal Project Directors in measuring progress toward achieving technology and pro- ject definition maturity during front-end planning prior to CD -2. DOE G 413.3-4, Technol-

3

Principal Associate Director - Capital Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Principal Associate Director - Capital Projects Principal Associate Director - Capital Projects As Principal Associate Director for Capital Projects, Henry is responsible for institutional large-project construction and management and environmental cleanup functions. Contact Operator Los Alamos National Laboratory (505) 667-5061 Before coming to the Lab in 2011, he served as manager of the $3.2 billion project to safely destroy the stockpile of deadly mustard chemical agent at the Pueblo Chemical Depot in Colorado. Paul Henry Principal Associate Director for Capital Projects Paul Henry, Principal Associate Director for Capital Projects As Principal Associate Director for Capital Projects, Henry is responsible for institutional large-project construction and management and environmental cleanup functions.

4

Cyclotron Institute Upgrade Project  

SciTech Connect (OSTI)

The Cyclotron Institute at Texas A&M University has upgraded its accelerator facilities to extend research capabilities with both stable and radioactive beams. The upgrade is divided into three major tasks: (1) re-commission the K-150 (88Ē) cyclotron, couple it to existing beam lines to provide intense stable beams into the K-500 experimental areas and use it as a driver to produce radioactive beams; (2) develop light ion and heavy ion guides for stopping radioactive ions created with the K-150 beams; and (3) transport 1+ ions from the ion guides into a charge-breeding electron-cyclotron-resonance ion source (CB-ECR) to produce highly-charged radioactive ions for acceleration in the K-500 cyclotron. When completed, the upgraded facility will provide high-quality re-accelerated secondary beams in a unique energy range in the world.

Clark, Henry [Texas A& M University; Yennello, Sherry [Texas A& M University; Tribble, Robert [Texas A& M University

2014-08-26T23:59:59.000Z

5

Work Authorization Document NSTX Upgrade Project  

E-Print Network [OSTI]

Work Authorization Document NSTX Upgrade Project Control Account #: 1302 Title: WBS 1.1.11 Title Functional Manager P. Heitzenroeder Approvals Signature Date NSTX-U Project Manager R. Strykowsky 4- WBS and includes design modifications and upgrade of the coil assembly stand; procedures for assembling the Center

Princeton Plasma Physics Laboratory

6

Are We There Yet? - Mike Peek, Director, Project Management ...  

Energy Savers [EERE]

- Mike Peek, Director, Project Management (MA-63) More Documents & Publications Project Management Update - Paul Bosco, Director, Office of Acquisition & Project Mgt R1A Slide 1...

7

Work Authorization Document NSTX Upgrade Project  

E-Print Network [OSTI]

Work Authorization Document NSTX Upgrade Project Control Account #: 7900 Title: WBS 1.7.3 Title Functional Manager L. Dudek Approvals Signature Date NSTX-U Project Manager R. Strykowsky 4- WBS Dictionary procedures and documents to support the integrated tests, and to support performance of the pre

Princeton Plasma Physics Laboratory

8

HERA Upgrade Project | Superconducting Magnet Division  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

HERA Upgrade Project HERA Upgrade Project As part of the HERA luminosity upgrade, 6 superconducting Interaction Region quadrupoles were delivered, accepted, and are in service. These 6 layer magnets were designed to include the main quadrupole focus, a skew quad, a normal and skew dipole, and a final sextupole layer. Because of the physical space constraints imposed by the existing detector region components, the DESY magnets were of necessity designed to be very compact. In addition, they are also are required to operate within the solenoidal detector fields at the collision points, so all construction materials had to be non magnetic. Two types of DESY magnets were fabricated. The first, designated as G0, was a two meter long, constant radius magnet. The second, designated GG, is a

9

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Office of Environmental Management (EM)

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project...

10

Nuclear Materials Safeguards and Security Upgrade Project Completed...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Safeguards and Security Upgrade Project Completed Under Budget | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering...

11

Federal Project Director Toolbox | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Federal Project Director Toolbox Federal Project Director Toolbox Federal Project Director Toolbox Although the majority of the documents listed on this page appear elsewhere on the PMCDP Web site, the FPD Tool Box page was specifically designed with all current and aspiring FPDs in mind in that it houses all of the PMCDP's major tools and job aids in one specific, easy-to-access location. Whether you are applying for a new level of certification, or determining which courses or activities will provide you with the most continuing education credits, the Toolbox is the place to go to locate the best information that will ensure your success in the PMCDP program. Below is a list of the most prominent PMCDP job aids to include a brief summary of their respective contents: Certification Equivalency Guideline (CEG): The CEG establishes the U.S.

12

Project L-070, ``300 Area process sewer piping system upgrade`` Project Management Plan  

SciTech Connect (OSTI)

This document is the project management plan for Project L-070, 300 Area process sewer system upgrades.

Wellsfry, H.E.

1994-09-16T23:59:59.000Z

13

Pacific Direct Current Intertie (PDCI) Upgrade Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Accommodate increased power transmission - The upgrade will allow even more clean power, including hydro, wind and solar, to reach markets that need it. Upgrading and...

14

General Engineer (Federal Project Director)  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as the overall Project Manager and expert responsible for providing leadership to program oversight activities for the operations of facilities to...

15

Categorical Exclusion 4598: Security Upgrade Project  

Broader source: Energy.gov (indexed) [DOE]

Determination Form Determination Form Proposed Action Title: Security Upgrade Project (4598) Program or Field Office~ Y·12 Site Office LocationCs) CCjty/County/State): Oak Ridge. Anderson County, Tennessee Proposed Action Description: PAGE 04 / 04 r~:·:~~s ·'-u ~'irllO:.'~~b ., .. y " ~e ··· ., ;:;;,il ,;: ; I·;;;:;;,; ;I ,' .: :~~. ,U,Illll\;: , "':ll ,l3~ . ~~~~ 1 ~; The proposed action is to add fence posts and run razor wire in various fence locations throughout the site. This project will not require excavation. This activity will disturb gravel but will not remove gravel and soil from post holes which will be placed back in the same area. Cat.eg,orieal Exc!usion(s) ,Mp!i.cd: 81.3- Routine maintenance

16

Project Management Update - Paul Bosco, Director, Office of Acquisitio...  

Office of Environmental Management (EM)

PM Update - Paul Bosco, Director, Office of Acquisition & Project Mgt More Documents & Publications Are We There Yet? - Mike Peek, Director, Project Management (MA-63) R1A Slide 1...

17

Health and Safety Plan for NSTX Upgrade Project Tasks  

E-Print Network [OSTI]

Draft 0 6/17/11 1 Health and Safety Plan for NSTX Upgrade Project Tasks in the NSTX Test Cell: _____________________________________________________________ Jerry Levine, Environment, Safety, Health and Security Head Reviewed by describes the structure and implementation of the Health and Safety Plan for the NSTX Upgrade Project work

Princeton Plasma Physics Laboratory

18

Health and Safety Plan for NSTX Upgrade Project Tasks  

E-Print Network [OSTI]

Health and Safety Plan for NSTX Upgrade Project Tasks in the NSTX Test Cell PRINCETON PLASMA....~_____...L....,L....q..l:::::.......:.J Larry Dudek, NSTX Center Stack Manager Reviewed by: I( Jer evine, Environment, Safety, Health and S This document describes the structure and implementation of the Health and Safety Plan for the NSTX Upgrade

Princeton Plasma Physics Laboratory

19

EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook,  

Broader source: Energy.gov (indexed) [DOE]

37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, 37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR SUMMARY This project would replace aging equipment at BPA's Celilo converter station and to upgrade equipment on the Celilo-Sylmar 500-kilovolt (kV) transmission line from the Celilo converter station in The Dalles, Oregon to the Nevada-Oregon border. As part of the project, BPA would remove and salvage the converter terminals 1 and 2 at its Celilo converter station and install a new two-converter terminal. A 20-acre expansion of the existing substation would accommodate the new terminal equipment. About 265 miles of transmission towers on the Celilo-Sylmar 500-kV transmission line would be

20

RECOVERY ACT: TAPOCO PROJECT: CHEOAH UPGRADE  

SciTech Connect (OSTI)

Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

Paul Tran; 293 Highway 740; Baden, NC 28009

2013-02-28T23:59:59.000Z

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

J.R. Simplot: Burner Upgrade Project Improves Performance and...  

Broader source: Energy.gov (indexed) [DOE]

Company saved energy and money by increasing the efficiency of the steam system in its potato processing plant in Caldwell, Idaho. J.R. Simplot: Burner Upgrade Project Improves...

22

Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades  

Broader source: Energy.gov [DOE]

Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades

23

Work Authorization Document NSTX Upgrade Project  

E-Print Network [OSTI]

heating system. The system will be composed of an AC/DC power conversion system, gyrotron source or other operational characteristic for the system will require upgrade. Only disruption qualification The Electron Cyclotron Heating System provides breakdown and startup assist through an electron cyclotron

Princeton Plasma Physics Laboratory

24

REQUEST FOR INDIRECT COST WAIVER I. Project Director  

E-Print Network [OSTI]

REQUEST FOR INDIRECT COST WAIVER I. Project Director: Department: Project Title: Project Sponsor without fully recovering the institutional indirect costs which will be incurred in conducting the project COSTS 1. FULL: OF I. A. C. 2. PARTIAL: OF H. B. K. TOTAL PROJECT COSTS L. INDIRECT COSTS TO BE WAIVED, J

Krovi, Venkat

25

The 12 GeV CEBAF Upgrade Project at Thomas Jefferson National Accelerator Facility, OAS-RA-L-11-13  

Broader source: Energy.gov (indexed) [DOE]

12 GeV CEBAF Upgrade 12 GeV CEBAF Upgrade Project at Thomas Jefferson National Accelerator Facility OAS-RA-L-11-13 September 2011 Department of Energy Washington, DC 20585 September 30, 2011 MEMORANDUM FOR THE DEPUTY DIRECTOR FOR SCIENCE PROGRAMS, OFFICE OF SCIENCE DIRECTOR, OFFICE OF RISK MANAGEMENT AND FINANCIAL POLICY, OFFICE OF THE CHIEF FINANCIAL OFFICER FROM: David Sedillo, Director NNSA & Science Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The 12 GeV CEBAF Upgrade Project at Thomas Jefferson National Accelerator Facility" Audit Report Number: OAS-RA-L-11-13 BACKGROUND In September 2008, the Department of Energy's (Department) Office of Science approved a construction project to double the electron beam energy of the Continuous Electron Beam

26

Wendy Cain named portfolio federal project director for ETTP cleanup  

Broader source: Energy.gov [DOE]

The U.S. Department of Energyís Oak Ridge Office of Environmental Management has named Wendy Cain as its new portfolio federal project director for cleanup of the East Tennessee Technology Park.

27

Fermilab | Directorate | Office of Project Management Oversight...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE links DOE Office of Project Assessment (SC-28) DOE Office of Project Assessment Project Management Processes and Procedures DOE Directives Home Page DOE Policies, Orders...

28

National Spherical Torus Experiment NSTX UPGRADE PROJECT  

E-Print Network [OSTI]

test plans, and operating procedures relevant to the safe conduct of operations. It will also include not be applicable. PPPL uses ESHD 5008 (PPPL Environment, Safety & Health Manual) Section 11 ("Operations Hazard) Guiding Principle for Operations Authorization of experimental projects. The PPPL approval process

Princeton Plasma Physics Laboratory

29

Response to Director's Review of Fermilab Project Management Improvement Initiatives  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Response to Director's Review of Fermilab Project Management Improvement Initiatives Response to Director's Review of Fermilab Project Management Improvement Initiatives May 14, 2013 Executive Summary Fermilab is entering a new, transitional era defined by the transformation from operating a very large experimental facility over several decades to managing and delivering a portfolio of new projects within technical performance, budget and schedule expectations. Throughout CY12, internal and external reviews identified some systemic weaknesses in execution of some construction activities and fabrication of components, including procurement planning and execution, cost estimating, and internal project communication. These Project Management System concerns have the potential to impact other projects and operational activities at the Laboratory if not addressed. Coincident with the

30

Fermilab | Directorate | Office of Project Management Oversight...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Policies and Procedures Fermi Project Management EVMS PolicyProcedures EVMS Certified System Documents OPSS Guidance Description Desktop Instructions Policy FRA Earned Value...

31

Rank Project Name Directorate, Dept/Div  

E-Print Network [OSTI]

Colichio) $6,240 $8,700.00 1.43 Mercury Removal 6 Bio-Diesel Tank Staff Services, F&O (Henry Hauptman) $11 was transferred to the Bio-Diesel Tank Project. #12;

32

Certified Federal Project Directors | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Certified Federal Project Directors Certified Federal Project Directors Project Assessment (OPA) OPA Home About Project Management SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Certified Federal Project Directors FPD Leadership Skills .pdf file (29KB) SC FPD 360¬į Mentoring Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov SC Federal Project Directors (FPD) and FPD Resources Certified Federal Project Directors Print Text Size: A A A RSS Feeds FeedbackShare Page Site Federal Project Director Level Certified Project Contact Information Ames Site Office (AMSO) Cynthia Baebler 1 630-252-1563 cynthia.baebler@ch.doe.gov Argonne Site Office (ASO) Dale Dietzel 1 630-252-2555 dale.dietzel@ch.doe.gov

33

Plains & Eastern Clean Line Project Proposal for New or Upgraded  

Broader source: Energy.gov (indexed) [DOE]

Plains & Eastern Clean Line Project Proposal for New or Upgraded Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010) Update to Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (August 2011) More Documents & Publications EIS-0486: Notice of Intent and Notice of Potential Floodplain and Wetland Involvement Notice of Intent To Prepare an Environmental Impact Statement for the

34

Switchyards Rebuild and Upgrade Project in Mohave County, Arizona  

Broader source: Energy.gov (indexed) [DOE]

. . Categorical Exclusion for the Demolition of a Service Building at Davis Dam Lower 230-kV Switchyard as part of the Overall Switchyards Rebuild and Upgrade Project in Mohave County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western Area Power Administration (Western) plans to demolish a service building located in the Lower 230-kV Switchyard at Davis Dam, because it no longer meets our needs and we do not anticipate finding a use for it in the future. The building is currently vacant and has been for years. We plan to begin the work on April 1 ,2011 and complete it by December 31,2011. The attached map shows the project area location. Aerial photographs show that much of this area is developed. Western owns the land. The legal description is

35

12 GeV Upgrade Project - Cryomodule Production  

SciTech Connect (OSTI)

The Thomas Jefferson National Accelerator Facility (Jefferson Lab) is producing ten 100+MV SRF cryomodules (C100) as part of the CEBAF 12 GeV Upgrade Project. Once installed, these cryomodules will become part of an integrated accelerator system upgrade that will result in doubling the energy of the CEBAF machine from 6 to 12 GeV. This paper will present a complete overview of the C100 cryomodule production process. The C100 cryomodule was designed to have the major components procured from private industry and assembled together at Jefferson Lab. In addition to measuring the integrated component performance, the performance of the individual components is verified prior to being released for production and assembly into a cryomodule. Following a comprehensive cold acceptance test of all subsystems, the completed C100 cryomodules are installed and commissioned in the CEBAF machine in preparation of accelerator operations. This overview of the cryomodule production process will include all principal performance measurements, acceptance criterion and up to date status of current activities.

J. Hogan, A. Burrill, G.K. Davis, M.A. Drury, M. Wiseman

2012-07-01T23:59:59.000Z

36

UCPath Project Status Report Report Date February 22, 2013 Project Director  

E-Print Network [OSTI]

1 UCPath Project Status Report Report Date February 22, 2013 Project Director Anthony Lo Anthony.Lo@ucop.edu Executive Sponsors Nathan Brostrom Peter Taylor Project Summary Scope Schedule Budget Resources for early March. The UCPath Center team is focused on development of internal operating procedures

Fainman, Yeshaiahu

37

Post Critical Decision-4 Mark Arenaz, Federal Project Director  

Broader source: Energy.gov (indexed) [DOE]

31, 2011 31, 2011 Lessons Learned from the In-Situ Grouting in the Subsurface Disposal Area Post Critical Decision-4 Mark Arenaz, Federal Project Director Summary Protection of the Snake River Plain Aquifer is a major driver for environmental remediation at the Department of Energy's (DOE) Idaho Site. In 2010, the Idaho Cleanup Project (ICP) used in-situ grouting to stabilize buried waste and reduce the migration of specific radioactive contaminates to the aquifer. The action was accomplished using American Recovery and Reinvestment Act (Public Law 111-5) Program funding of a capital asset acquisition project under DOE Order 413.3A, Program and Project Management for Acquisition of Capital Assets. Lessons learned from previous subsurface grouting activities contributed to the safe, timely and

38

Charles D. Young Project Engineer Government Support Directorate  

Office of Legacy Management (LM)

Please call if you have questions regarding the attached recommendation. i?&,o-o; Please call if you have questions regarding the attached recommendation. i?&,o-o; ~~~pApv $l$I Charles D. Young Project Engineer Government Support Directorate Architecture Planning and Technology Division CDY/smb Attachment cc: J. Fiore ;;,ewis (w/o) TH' E AEROSPACE CORPORATION i ' 0 A Suite 7900, 955 L' Enfam Plaza. S. W., Woshingron. D.C. 20024-2174. Tekphonc (202) 488-6000 7117-03.87.cdy.43 23 September 1987 CA Mr. Andrew Wallo, III, NE-23 Division of Facility & Site Decosunissioning Projects U.S. Department of Energy Germantown, Maryland 20545 Dear Mr. Wallo: ELIMINATION RECOMMENDATION -- COLLEGES AND UNIVERSITIES The attached elimination reconnnendation was prepared in accordance PC.o= with your suggestion during our meeting on 22 September. The recommendation flD.o-02

39

Tank farm restoration and safe operation, Project W-314, upgrade scope summary report (USSR)  

SciTech Connect (OSTI)

The revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from customer guidance. Included are incorporation of the recommendations from HNF-2500, agreements regarding interfaces with Project W-211, and assumption of scope previously assigned to Project W-454.

Gilbert, J.L.

1998-07-23T23:59:59.000Z

40

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in  

Broader source: Energy.gov (indexed) [DOE]

4: Montana-to-Washington Transmission System Upgrade Project 4: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana SUMMARY This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations. The project website is http://efw.bpa.gov/environmental_services/Document_Library/M2W/. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVALABLE FOR DOWNLOAD May 3, 2012 EIS-0484: Notice of Intent to Prepare an Environmental Impact Statement

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

48: Gila-North Gila Rebuild and Upgrade Project, Yuma County, 48: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona SUMMARY DOE's Western Area Power Administration (Western) is preparing an EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service's construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies. PUBLIC COMMENT OPPORTUNITIES Send comments on the Draft Environmental Assessment by January 21, 2014, by

42

Fernald Environmental Management Project Director's Final Findings and Orders, October 4, 1995  

Broader source: Energy.gov (indexed) [DOE]

Fernald Environmental Management Project Director's Final Findings and Orders, Octobe.. Page 1 of 17 Fernald Environmental Management Project Director's Final Findings and Orders, Octobe.. Page 1 of 17 EM Home | Regulatory Compliance | Environmental Compliance Agreements Fernald Environmental Management Project Director's Final Findings and Orders, October 4, 1995 BEFORE THE OHIO ENVIRONMENTAL PROTECTION AGENCY In the Matter Of: United States Department of Energy : Director's Final Fernald Environmental Management Project : Findings and Orders P.O. Box 389705 : Cincinnati, Ohio 45239 : Respondent It is hereby agreed by and among the parties hereto as follows: Table of Contents I. Jurisdiction II. Parties Bound III. Definitions IV. Findings of Fact V. Orders VI. Limitations of Director's Approval VII. Notice VIII. Project Managers IX. Dispute Resolution

43

Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations  

SciTech Connect (OSTI)

This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314`s 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project`s work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve manifolds, leak detectors, and special protective coatings similar to those previously approved for the AN Valve Pit Upgrades design package. The new transfer lines included in this package (with official line number designations) are described within.

Boes, K.A.

1998-04-15T23:59:59.000Z

44

Federal Project Director of the Year for 2011 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Federal Project Director of the Year for 2011 Federal Project Director of the Year for 2011 Federal Project Director of the Year for 2011 (from left to right) Daniel Poneman; David Arakawa; Phillip Kraushaar; Johnny Moore; Daniel Lehman; Ingrid Kolb (from left to right) Daniel Poneman; David Arakawa; Phillip Kraushaar; Johnny Moore; Daniel Lehman; Ingrid Kolb Presented to: David K. Arakawa For demonstrating exceptional leadership and project management acumen as Federal Project Director (FPD) for the $68.5 million Spallation Neutron Source (SNS) Instruments - Next Generation (SING) Project at Oak Ridge National Laboratory. The SING project provides five best-in-class neutron instruments to support the neutron-scattering needs of the U.S. research community. FPD since June of 2006, David led by example with a

45

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS  

Broader source: Energy.gov (indexed) [DOE]

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 AUGUST 2011 Table of Contents 1. Executive Summary .......................................................................................................... 1 2. Project Update .................................................................................................................. 2 a. Jobs and Economic Development ........................................................................................................... 5 b. Interconnection Studies ............................................................................................................................. 6 c. Routing and Public Outreach ................................................................................................................... 7

46

CSI Welcomes Chris Anderson as Assistant Director The Climate Science Initiative now has an assistant director to help oversee new projects  

E-Print Network [OSTI]

CSI Welcomes Chris Anderson as Assistant Director The Climate Science Initiative now has an assistant director to help oversee new projects and activities of CSI. Chris most recently served as lead of contact on all numerical weather prediction projects and also established an initiative to use numerical

Debinski, Diane M.

47

Addendum to the Technical Design Report for the Upgrade of the ALICE Time Projection Chamber  

E-Print Network [OSTI]

This is the addendum to the TDR of the upgrade of the ALICE Time Projection Chamber (CERN-LHCC-2013-020 ; ALICE-TDR-016). The key objective of the upgrade is the replacement of the present MWPC-based readout chambers by detectors that allow continuous operation without active ion gating. In the TDR, we propose a solution that employs stacks of four Gas Electron Multipliers (GEMs) and demonstrate that it fulfills the design specifications, in particular in terms of intrinsic position resolution, energy resolution, and ion backflow. In this document we demonstrate with additional results from both detector R&D and simulations that the technological solution chosen in the TDR has sufficient safety margin for a successful campaign with the upgraded detector in RUN 3 and beyond.

The ALICE Collaboration

2015-01-01T23:59:59.000Z

48

Post Critical Decision-4 Mark Arenaz, Federal Project Director  

Broader source: Energy.gov (indexed) [DOE]

those elements of project requirements documents relative to electrical equipment and lockouttagout. Improvement Action Lesson learned has been incorporated into the prime...

49

Current Lead Design for the Accelerator Project for Upgrade of LHC  

SciTech Connect (OSTI)

The Accelerator Project for Upgrade of LHC (APUL) is a U.S. project participating in and contributing to CERN's Large Hadron Collider (LHC) upgrade program. In collaboration with Brookhaven National Laboratory, Fermilab is developing sub-systems for an upgrade of the LHC final focus magnet systems. A concept of main and auxiliary helium flow was developed that allows the superconductor to remain cold while the lead body warms up to prevent upper section frosting. The auxiliary flow will subsequently cool the thermal shields of the feed box and the transmission line cryostats. A thermal analysis of the current lead central heat exchange section was performed using analytic and FEA techniques. A method of remote soldering was developed that allows the current leads to be field replaceable. The remote solder joint was designed to be made without flux or additional solder, and able to be remade up to ten full cycles. A method of upper section attachment was developed that allows high pressure sealing of the helium volume. Test fixtures for both remote soldering and upper section attachment for the 13 kA lead were produced. The cooling concept, thermal analyses, and test results from both remote soldering and upper section attachment fixtures are presented.

Brandt, Jeffrey S.; Cheban, Sergey; Feher, Sandor; Kaducak, Marc; Nobrega, Fred; Peterson, Tom

2010-01-01T23:59:59.000Z

50

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010)  

Broader source: Energy.gov (indexed) [DOE]

PROJECT PROPOSAL PROJECT PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 JULY 2010 TABLE OF CONTENTS INTRODUCTION 1. The Challenge ....................................................................................................................................... 1 2. The Solution .......................................................................................................................................... 1 SECTION I: STATUTORY CRITERIA 1. General Description of the Entity ................................................................................................... 4 2. Project Description ............................................................................................................................. 5

51

Fernald Environmental Management Project Director's Final Findings & Orders, September 10, 1993  

Broader source: Energy.gov (indexed) [DOE]

SEPI o 1993 SEPI o 1993 OHIO ENlmo In the Matter of: U. S. Department of Energy Femald Environmental Management Project P.O. Box 389705 Cincinnati, Ohio 45239 Issue Date: Effective Date: SEP1 0 1993 BEFORE THF, NMENTAL PROTECTION AGENCY . Director's Final Fi&in~s and Orders PREAMBLE It is hereby agreed by and among the parties hereto as follows: I. J-VRISDICTION These Director's F;ina.lFindings and Orders ("Orders") are issued to the U.S. Department of Energy ("Respondent") pursuant to the authority vested in the Director of the Ohio Environmental Protection Agency ("Ohio EPA") in Ohio Revised Code ("ORC") sections3734.02(G) and 3745.01. TheseOrders shallapply to and be binding upon the Respondent,its agents, assigns,

52

The Role of The fedeRal PRojecT diRecToR  

Broader source: Energy.gov (indexed) [DOE]

Role of The fedeRal PRojecT diRecToR: Role of The fedeRal PRojecT diRecToR: lessons fRom The naTional igniTion faciliTy The national ignition facility (nif) is home of the world's largest laser. With 192 laser beams that can deliver more than 60 times the energy of any previous laser system, NIF represents a significant step in enabling the study of high-energy density science, and should demonstrate fusion ignition and burn in the laboratory for the first time. The design and construction of this unique, highly complex facility posed management challenges that the project team overseeing its development could not foresee. The national ignition facility's final optics assemblies, shown here mounted on the lower hemisphere of the target chamber, contain

53

Design aspects of upgradation from 6 pulse to 12 pulse operation of NHVDC project  

SciTech Connect (OSTI)

In India, the first HVDC project was a back to back link between the northern grid and the Western grid at Vindhyachal. This project was commissioned by an external agency. By 1982 it was abundantly clear that HVDC would find a significant place in Indian power system. Government of India in its wisdom approved a proposal for an experimental HVDC line project to give Indian planners, manufacturers and utilities an opportunity to absorb the technology. The stage-1 of this National HVDC (NHVDC) project was successfully commissioned in October 1990, and has since been operating quite satisfactorily. In continuation of that effort, Government of India has since approved stage-2 of NHVDC project, which is under execution, at present. In stage-1, the challenge was to do the system studies, manufacture main circuit equipment and develop a controller. In stage-2 the focus will be on modernization and project engineering. The major change in stage-2 shall be the modernization of the controls. Upgradation details and the care being taken to have minimum disturbance to the existing setup, it discussed in this paper. The operational requirements, system solutions and control system aspects which have been considered and are being implemented for this project are also covered.

Singhal, A.; Gera, R.; Tripathy, A.K.; Adhikari, T.; Hanif, M. [Bharat Heavy Electricals Ltd., New Delhi (India). Transmission Projects Dept.; Prakash, K.S.; Das, R.L. [Bharat Heavy Electricals Ltd., Bangalore (India). Electronics Div.

1995-12-31T23:59:59.000Z

54

Achievements of the ATLAS Upgrade Planar Pixel Sensors R&D Project  

E-Print Network [OSTI]

In the framework of the HL-LHC upgrade, the ATLAS experiment plans to introduce an all-silicon inner tracker to cope with the elevated occupancy. To investigate the suitability of pixel sensors using the proven planar technology for the upgraded tracker, the ATLAS Planar Pixel Sensor R&D Project (PPS) was established comprising 19 institutes and more than 90 scientists. The paper provides an overview of the research and development project and highlights accomplishments, among them: beam test results with planar sensors up to innermost layer fluences (> 10^16 n_eq cm^2); measurements obtained with irradiated thin edgeless n-in-p pixel assemblies; recent studies of the SCP technique to obtain almost active edges by postprocessing already existing sensors based on scribing, cleaving and edge passivation; an update on prototyping efforts for large areas: sensor design improvements and concepts for low-cost hybridisation; comparison between Secondary Ion Mass Spectrometry results and TCAD simulations. Together, these results allow an assessment of the state-of-the-art with respect to radiation-hard position-sensitive tracking detectors suited for the instrumentation of large areas.

C. Nellist

2014-11-20T23:59:59.000Z

55

Microsoft Word - WC_Digital_Communication_System_Upgrade_Project_CX_Update.docx  

Broader source: Energy.gov (indexed) [DOE]

5, 2013 5, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager -TEP-CSB-1 Proposed Action: Digital Communication System Upgrade Project: 'D' Analog System Retirement and #WC SONET Ring (update to previous Categorical Exclusion issued on February 22, 2013) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Microwave, meteorological, and radio towers Location: Douglas County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In addition to the work described in the previous Categorical Exclusion, BPA proposes to add a permanent gravel parking area next to the existing access road outside BPA's Columbia Substation. The new parking area would be used to

56

Fernald Environmental Management Project Director's Final Findings & Orders, June 6, 1996  

Broader source: Energy.gov (indexed) [DOE]

. - . - ~ June 6, 1996 Re: Director's Final Findings & Orders U.S. Department of Energy Cincinnati, Ohio U.S. EPA ID No: OH6890008976 Mr. Phil Hammric U.S. Department of Energy Femald Environmental Management Project P.O. Box 389705 Cincinnati, Ohio 45239 Mr. John Bradbume Femald Environmental Restoration Corporation P.0. Box 538704 Cincinnati, Ohio 45253-8704 Dear Mr. Hammric and Mr. Bradbume: Transmitted herewith are Final Findings and Orders of the Director concrrning the matter indicated above. Thomas E. Crepeau, Manager Data Management Section Division of Hazardous Waste Management cc: Michael Savage, Asst. Chief, DHWM Mark Navarre, Legal Supervisor Paul Pardi, DHWM, SWDO Dave Wertz, DHWM, NED0 Don Marshall, DHWM, SWDO Steve Hamlin, DHWM, SEDO

57

Fernald Environmental Management Project Director's Final Findings & Orders, December 27, 1994  

Broader source: Energy.gov (indexed) [DOE]

Ohio Environmental Protection Agency Ohio Environmental Protection Agency 0.0. Box 163669,180O WaterMark Dr. dumbus, Ohio 43216-3669 '\ 644-3020 .X (614) 644-2329 December 27. 1994 Re: U.S. Department of Energy Fernald Environmental Management Project Attn: Jack Craig, Acting Site Manager P.O. Box 389705 Cincinnati, Ohio 45239 Fernald Environmental Restoration Management Corporation Attn: Don Ofte, President P.O. Box 538704 Cincinnati, Ohio 45253-8704 Dear Sirs: /---. ., ( 1 6454 c t f.. .: ,? I '; Lb.. i" _ && 't$oinovich Governor -., ._ . _ - --. .-....-. _ .___ WY. Director's Fina$Li&Xng.s,& Orders U.S. Department of Energy .-- +-_ Fernald-Environmental Restoration Management Corporation U.S. EPA ID No.: OH6890008976 CERTIFIED MAIL Transmitted herewith are Final Findings & Orders of the Director

58

IBBM-2004 Conference, Asilomar, CA September 2004, to appear in NIMB The ORNL Multicharged Ion Research Facility Upgrade project  

E-Print Network [OSTI]

Research Facility (MIRF) to extend the energy range of multicharged ions available for experimental Research Facility Upgrade project F. W. Meyer* , M. E. Bannister, D. Dowling, J. W. Hale, C. C. Havener, J, France Abstract A new 250 kV high voltage platform has been installed at the ORNL Multicharged Ion

59

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect (OSTI)

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

60

UCPath Project Status Report Report Date September 7, 2012 Project Director  

E-Print Network [OSTI]

this transition. Project Status Project Management Start Date Finish Date Status Decisions, Issues and Risks 1 areas have been completed. The Management Workgroup has agreed to begin preliminary planning to convert the case management/knowledge management tool. The UCPath PMO has completed initial mapping of entry

Talley, Lynne D.

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Fermilab | Directorate |  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

thumb thumb thumb thumb thumb thumb thumb thumb thumb thumb thumb thumb thumb thumb thumb photo Nigel Lockyer Laboratory Director Profile photo Victoria A. White Chief Operating Officer Profile photo Stuart Henderson Associate Laboratory Director for Accelerators Profile photo Greg Bock Associate Laboratory Director for Particle Physics Profile photo Randy Ortgiesen Associate Laboratory Director for Operations Support Profile photo Martha Michels Director for ESH&Q and Head of the ESH&Q Section Profile photo Cynthia Conger Chief Financial Officer Profile photo Carl Strawbridge Interim Head, Integrated Planning & Performance Management Profile photo Jim Strait LBNE Project Manager Profile photo Robert Kephart IARC Director/ SRF Program Manager View Profile Profile photo Stephen Geer Head, Program Planning Office

62

UCPath Project Status Report Report Date May 25, 2012 Project Director  

E-Print Network [OSTI]

finalized and will be posted next week. Functional SMEs are focused on analysis of functional gaps. The UCPath Center project team is rapidly ramping up while also making progress in the technology identified at each location to provide local leadership and coordination. In addition, the Shared Technology

Russell, Lynn

63

LED Light Fixture Project FC1 Director's Conference Room: Life Cycle Cost and Break-even Analysis  

E-Print Network [OSTI]

LED Light Fixture Project ­ FC1 Director's Conference Room: Life Cycle Cost and Break-even Analysis sources. One of the emerging lighting technologies that facilities organizations are looking at are LEDs. A light-emitting diode (LED) is a solid-state lighting source that switches on instantly, is readily

Johnston, Daniel

64

Acquisition Executive Associate Director for  

E-Print Network [OSTI]

Contracting Officer Princeton Site Office PPPL Laboratory Director S.Prager Deputy Director for Operations A. Cohen Associate Director M. Williams PPPL Management Best Practices & Outreach J. Delooper QA/QC J. Malsbury Env. Safety , Health & Security J.Levine Princeton University PPPL Advisory Board NSTX Upgrade

Princeton Plasma Physics Laboratory

65

Nuclear safety procedure upgrade project at USEC/MMUS gaseous diffusion plants  

SciTech Connect (OSTI)

Martin Marietta Utility Services has embarked on a program to upgrade procedures at both of its Gaseous Diffusion Plant sites. The transition from a U.S. Department of Energy government-operated facility to U.S. Nuclear Regulatory Commission (NRC) regulated has necessitated a complete upgrade of plant operating procedures and practices incorporating human factors as well as a philosophy change in their use. This program is designed to meet the requirements of the newly written 10CFR76, {open_quotes}The Certification of Gaseous Diffusion Plants,{close_quotes} and aid in progression toward NRC certification. A procedures upgrade will help ensure increased nuclear safety, enhance plant operation, and eliminate personnel procedure errors/occurrences.

Kocsis, F.J. III

1994-12-31T23:59:59.000Z

66

TO: Procurement Directors/Contracting Officers FROM: Director  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

51 DATE: June 22, 2012 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Acquisition and Project Management...

67

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana  

Broader source: Energy.gov [DOE]

This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations.

68

EA-1937: Pacific Direct Intertie Upgrade Project; Lake, Jefferson, Crook, Deschutes, and Wasco Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA that assesses the potential environmental impacts of a proposal to replace equipment at BPAís Celilo converter station and upgrade equipment on the Celilo-Sylmar 500-kilovolt (kV) transmission line from The Dalles, Oregon, to the Nevada-Oregon border.

69

AN E&E PUBLISHING SERVICE ENERGY EFFICIENCY: Tenn. project to test range of residential upgrades  

E-Print Network [OSTI]

to 35 years old and ready for upgrades to heating, ventilation and air conditioning systems, which make into the home's conditioned space. They made sure the air conditioning ductwork was inside that zone. During and the air sealing of the attic," he said. "Once you do that, you spend less on your heating and air

70

Operations Directorate (OPS Directorate)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations Directorate (OPS Directorate) Operations Directorate (OPS Directorate) Purpose A group chartered by the Associate Laboratory Director for the Advanced Photon Source that includes the responsible Division Directors and other appropriate APS operations personnel. The Operations Directorate collectively coordinates operating decisions that affect the facility as a whole and establishes both long- and short-term schedules, including scheduled maintenance and facility improvement periods. The Operations Directorate is the APS forum in which decisions regarding operations are discussed: These include, but are not limited to: Safety issues related to operations Operational Schedule Global operating parameters within the defined and approved operational and safety envelopes, such as energy, maximum circulating beam

71

Director HR Andrew J Smith  

E-Print Network [OSTI]

Director HR Andrew J Smith Associate Director HR Shared Services Miya Chiba Associate Director Payroll Officer John Smith Systems & Project Analyst Blair Jordan HR Reporting Analyst Yana Zhang Manager

Liley, David

72

Managing Director Buildings, Transportation  

E-Print Network [OSTI]

Site Development Will Terris Manager Gardening Maintenance Jim Gish Manager Landscape Specialty Tegwyn Maintenance and project Delivery Scott Sherwood Director Transportation Services Glenl Wear Director Grounds Supervisor Specialty Crews 17 Area supervisors Custodial Maintenance Charles Anderson Supervisor Activity

Seamons, Kent E.

73

EA-1948: Gila-North Gila Transmission Line Rebuild and Upgrade Project, Yuma County, Arizona  

Broader source: Energy.gov [DOE]

DOEís Western Area Power Administration (Western) prepared this EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Serviceís construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies.

74

NNSA¬źs Management of the $245 million Nuclear Materials Safeguards and Security Upgrades Project Phase II at Los Alamos National Laboratory  

Broader source: Energy.gov (indexed) [DOE]

NNSA's Management of the $245 NNSA's Management of the $245 Million Nuclear Materials Safeguards and Security Upgrades Project Phase II DOE/IG-0901 January 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 January 2, 2014 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Special Report on "NNSA's Management of the $245 million Nuclear Materials Safeguards and Security Upgrades Project Phase II at Los Alamos National Laboratory" BACKGROUND The National Nuclear Security Administration's Los Alamos National Laboratory (LANL) is responsible for the protection and control of a significant portion of the Nation's special nuclear

75

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Broader source: Energy.gov (indexed) [DOE]

Western Area Power Administration Western Area Power Administration Fort Collins 115-kV Transmission Line Upgrade Project, Fort Collins, Colorado. AGENCY: Western Area Power Administration, DOE ACTION: Finding of no significant impact SUMMARY: The Department of Energy (DOE), Western Area Power Administration (Western) is the lead federal agency for a proposed project to upgrade the electric transmission system in the Fort Collins, Colorado area. Platte River Power Authority (Platte River) is proposing to add additional generation at its Rawhide Power Plant, to rebuild and upgrade segments of Western's existing Flatiron-Poudre and Poudre-Richard's Lake 115-kilovolt (kV) transmission lines, and to install additional 230 kV transmission to Platte River's existing electrical system. Western prepared an environmental assessment (EA) titled "Fort Collins 115kV Transmission

76

Jade Sky Technologies Partners with CLTC on LED Replacement Lamp Upgrade Project UC Davis' California Lighting Technology Center will utilize Jade Sky Technologies' driver ICs to help spur  

E-Print Network [OSTI]

Jade Sky Technologies Partners with CLTC on LED Replacement Lamp Upgrade Project UC Davis of cost-effective, easy-to-use LED lighting solutions Milpitas, Calif. ­ October 15, 2013 ­ Jade Sky Technologies (JST), a clean-tech start-up manufacturer of driver ICs for LED lighting applications, announces

California at Davis, University of

77

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR THE FORT COLLINS 115kV TRANSMISSION LINE UPGRADE PROJECT Prepared for: Platte River Power Authority and U.S. Department of Energy Western Area Power Administration DOE/EA 1354 September 2001 i TABLE OF CONTENTS SUMMARY ............................................................................................................... S-1 1.0 INTRODUCTION ...............................................................................................1-1 1.1 DESCRIPTION OF PROPOSED PROJECT .................................................................. 1-1 1.3 PURPOSE OF ENVIRONMENTAL ASSESSMENT....................................................

78

Line Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Line Projects BPA identifies critical infrastructure and...

79

Project W-314 specific test and evaluation plan for AZ tank farm upgrades  

SciTech Connect (OSTI)

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation P1 an (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities, etc), Factory Tests and Inspections (FTIs), installation tests and inspections, Construction Tests and Inspections (CTIs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1998-08-12T23:59:59.000Z

80

GENII (Generation II): The Hanford Environmental Radiation Dosimetry Software System: Volume 3, Code maintenance manual: Hanford Environmental Dosimetry Upgrade Project  

SciTech Connect (OSTI)

The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). This coupled system of computer codes is intended for analysis of environmental contamination resulting from acute or chronic releases to, or initial contamination of, air, water, or soil, on through the calculation of radiation doses to individuals or populations. GENII is described in three volumes of documentation. This volume is a Code Maintenance Manual for the serious user, including code logic diagrams, global dictionary, worksheets to assist with hand calculations, and listings of the code and its associated data libraries. The first volume describes the theoretical considerations of the system. The second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. 7 figs., 5 tabs.

Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

1988-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Oak Ridge National Laboratory - Global Security Directorate  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Director Defense Advanced Research Projects Agency Programs, Global Security Directorate Oak Ridge National Laboratory Post Office Box 2008, MS-6138 Oak Ridge, Tennessee...

82

TO: Procurement Directors/Contracting Officers FROM: ...  

Broader source: Energy.gov (indexed) [DOE]

2 DATE: June 17, 2014 TO: Procurement DirectorsContracting Officers FROM: Director, Contract and Financial Assistance Policy Division Office of Acquisition and Project Management...

83

Bill McMillan named federal project director for ORNL cleanup...  

Broader source: Energy.gov (indexed) [DOE]

for the Uranium-233 Disposition Project. McMillan holds a bachelor's degree in biology from the College of Charleston and a master's degree in environmental systems...

84

Microsoft PowerPoint - CF-LM M2W Project Updates_final [Compatibility...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Upgrade Project (M2W Project) Project description: * Upgrade existing BPA Transmission system West of Garrison substation. Project includes upgrades at five...

85

Director Human Resources Assoc Director  

E-Print Network [OSTI]

Director ­ Human Resources Assoc Director Workforce Planning & Organisational Change Director) - Organisational change - Workforce planning - Grievance & performance mgt support - Performance management line and not a formal Branch ** Includes Classifications ANU Search Workforce Planning* Remunerations

Botea, Adi

86

The Bottom Line Space@Penn Upgrade  

E-Print Network [OSTI]

The Bottom Line Space@Penn Upgrade Coming Soon! A project is underway to upgrade the current that allows designated users in the field to update certain elements of their space. This project, whose: Grants & Projects ­ Used for invoice generation, overhead and revenue recognition, and award and project

Sharp, Kim

87

Chris Sexton Assistant Director  

E-Print Network [OSTI]

Peter Armstrong Infrastructure Stewart Harris Application Support Martin Rapier Network Group Unix Group Barraclough Business Support Peter Armstrong Performance Space Reuben Grocock Assistant Director Business Julia Harrison Programme and Projects Unit Pablo Stern Reporting & Management Information Phillip

Martin, Stephen John

88

Executive Director  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Executive Director Executive Director Rich Marquez, Executive Director, leads institutional initiatives and provides oversight for the Laboratory's organizations for Ethics and Audits, Prime Contract, Chief Financial Officer, Chief Information Officer, Ombuds, and Communications and Government Affairs. Contact Operator Los Alamos National Laboratory (505) 667-5061 Marquez has received a number of significant awards and recognitions, including the Presidential Rank Award for Meritorious Service. Rich Marquez Executive Director Rich Marquez, Executive Director Richard A. (Rich) Marquez currently serves Los Alamos National Laboratory as executive director reporting to the Laboratory director. Marquez leads institutional initiatives and provides oversight for several Laboratory organizations, including

89

E-Print Network 3.0 - associate director department Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Broussard Director -Abraham Dones... Smith McKoy Director -VACANT Associate Director -Toni Thorpe Program Coordinator -Judson Fraley... Diverse Departments Project Coordinator...

90

Fermilab | Directorate | Director Profiles | Jim Strait  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Jim Strait Jim Strait LBNE Project Manager As the LBNE Project Manager, I have the overall responsibility and authority to execute the LBNE Project, and to meet the approved scientific, cost and schedule goals of the project. In this role, I lead and direct the development of the technical, cost and schedule baseline for the project and the construction of the project defined by the approved baseline. I also prepare for and establish management systems, consistent with DOE and Fermilab Project Management orders and structures, to ensure that the project is successfully executed. I also represent the Project in interactions with the LBNE collaboration, Fermilab management, management of other participating national laboratories, and the Department of Energy. As the LBNE project manager, I report to the laboratory director. I head

91

Whistling Ridge Energy Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Whistling Ridge Energy Project Bonneville Power...

92

John Hervey Executive Director  

E-Print Network [OSTI]

John Hervey Executive Director #12;Historical Perspective · NACS Technology Standards Project · Project Components ­ Four areas of concentration · Payment Systems ­ terminal-to-host · Device Integration. Impact 21 Group, LLC Incomm Intermec Technologies Corp Kenan Advantage Group, Inc. Lance, Inc. Liberty

Brock, David

93

Deputy Director  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Deputy Director Deputy Director Laboratory Deputy Director Elizabeth Sellers has nearly 30 years of management experience leading the integration and improvement of large, complex, and technically diverse environments. Contact Operator Los Alamos National Laboratory (505) 667-5061 Sellers comes to the Laboratory with nearly 30 years of management experience working for the U.S. Department of Energy and private industry, leading the integration and improvement of large, complex, and technically diverse environments. Elizabeth Sellers Laboratory Deputy Director Deputy Director Elizabeth Sellers Elizabeth (Beth) Sellers joined Los Alamos National Laboratory as deputy director on December 5, 2011. Sellers comes to the Laboratory with nearly 30 years of management experience working for the U.S. Department of Energy and private industry,

94

NOAA ARL Monthly Activity Report Bruce B. Hicks, Director  

E-Print Network [OSTI]

NOAA ARL Monthly Activity Report July 2001 Bruce B. Hicks, Director Air Resources Laboratory ­ Canaan Valley. Meetings were held among ATDD staff concerning an upgrade to the Canaan Valley Air

95

Fermilab | Directorate | Fermilab Directorate Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fermilab Directorate Documents Red-Bulleted Items are Restricted to Fermilab Green-Bulleted Items are Unrestricted Final Report of Injury Reduction Plan 2006 Contract No....

96

Director's Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Director's Office Director's Office Director's Office Print Roger Falcone Director, Advanced Light Source, Ernest Orlando Lawrence Berkeley National Laboratory and Professor of Physics, University of California, Berkeley. Roger Falcone Web page at the University of California, Berkeley Advanced Light Source Lawrence Berkeley National Laboratory 1 Cyclotron Road, MS 80R0114 Berkeley, CA 94720 USA Tel. (510) 486-6692 Fax (510) 486-4960 Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Roger Falcone, University of California, Berkeley physics professor and veteran ALS user, succeeded Janos Kirz as ALS Division Director on September 1, 2006. Dr. Falcone received his undergraduate degree in physics from Princeton University in 1974. He earned an M.S. and Ph.D. in

97

Laboratory Directors  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

S. Hecker (1985-1997) Donald M. Kerr (1979-1985) Harold M. Agnew (1970-1979) Norris Bradbury (1945-1970) J. Robert Oppenheimer (1943-1945) Laboratory Directors Harold M. Agnew...

98

Ongoing Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Current Projects Current Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated November 2013) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov Project Construction Photos Current Projects Print Text Size: A A A RSS Feeds FeedbackShare Page Photos of current SC Projects 12 GeV CEBAF Upgrade .pdf file (3.2MB) Daya Bay .pdf file (1.0MB) National Spherical Torus Experiment (NSTX) .pdf file (841KB) National Synchrotron Light Source II (NSLS II) .pdf file (6.4MB)

99

Chapter 4, Small Commercial and Residential Unitary and Split System HVAC Cooling Equipment-Efficiency Upgrade Evaluation Protocol: The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures  

Broader source: Energy.gov (indexed) [DOE]

4: Small Commercial 4: Small Commercial and Residential Unitary and Split System HVAC Cooling Equipment-Efficiency Upgrade Evaluation Protocol David Jacobson, Jacobson Energy Research Subcontract Report NREL/SR-7A30-53827 April 2013 The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures 4 - 1 Chapter 4 - Table of Contents 1 Measure Description .............................................................................................................. 2 2 Application Conditions of Protocol ....................................................................................... 3 2.1 Programs with Enhanced Measures ................................................................................. 5 3 Savings Calculations .............................................................................................................. 6

100

Fermilab | Directorate | Director Profiles | Robert Kephart  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Robert Kephart Robert Kephart IARC Director/SRF Program Manager As the Director of the Illinois Accelerator Research Center (IARC) at Fermilab my goal is to bridge the gap between breakthroughs in accelerator science and technology and solutions for society. IARC will allow our university and laboratory partners to leverage Fermilab's extensive accelerator infrastructure and expertise, resulting in new accelerator-based products and businesses in the United States. I proposed and lead a construction project funded by the U.S. Department of Energy and the State of Illinois to build a new complex valued at $70 million to support the IARC mission on the Fermilab campus. I manage the superconducting radio frequency (SRF) technology program, a $30 million-a-year research and development effort that supports a proposed new

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Mr. William f. Crow, Acting Director . Uranium Fuel Licensing...  

Office of Legacy Management (LM)

Director Division of Facility and Site Decomnlssioning Projects Office of Nuclear Energy 3 Enclosures , ---- - . . : . ' . . . . ENCLOSURE 7 FORMERLY UTILIZED SITES...

102

Financing Energy Upgrades for K-12 School Districts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Financing Energy Upgrades for K-12 School Districts Financing Energy Upgrades for K-12 School Districts Page 2 Table of Contents Introduction................................................................................................................................................................................................................... 4 What This Guide Covers .................................................................................................................................................................................. 6 Chapter 1: Principles of Financing Energy Upgrades for Schools .................................................................................................. 7 Principle 1. Start with Clear Project Objectives.......................................................................................................................................... 7

103

EECBG Success Story: County Partners with Siemens on Energy Upgrades...  

Office of Environmental Management (EM)

Block Grant (EECBG) to develop projects including a solar photovoltaic energy system, LED lighting at municipal buildings, boiler upgrades, energy efficiency retrofits at the...

104

Bedford Energizes Other Communities to Upgrade | Department of...  

Energy Savers [EERE]

program and completed energy efficiency upgrades in their own homes, the rate of project completion was more than double the average of that across all participating...

105

DOE/EIS-0169-SA-04: Supplement Analysis for Yakima Fisheries Project--Construction/modification upgrades to the Prosser Hatchery and the Marion Drain Hatchery Facilities (11/7/00)  

Broader source: Energy.gov (indexed) [DOE]

November 7, 2000 November 7, 2000 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for Yakima Fisheries Project, (DOE/EIS-0169-SA-04) memorandum David Byrnes Project Manager - KEWN-4 TO : Proposed Action: Yakima Fisheries Project - Construction/modification upgrades to the Prosser Hatchery and the Marion Drain Hatchery facilities. Project No.: F3204 Location: Prosser and Toppenish, Yakima County, Washington. Proposed by: Bonneville Power Administration (BPA) and Co-Managed by the Yakama Nation (YN) and the Washington Department of Fish and Wildlife (WDFW). 1. Introduction The Bonneville Power Administration is funding ongoing studies, research, and artificial production of several salmonid species in the Yakima and Klickitat river basins. BPA analyzed

106

Fermilab | Directorate | Director Profiles | Carl Strawbridge  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carl Strawbridge Carl Strawbridge Interim Head, Integrated Planning & Performance Management I head the Office of Integrated Planning & Performance Management (IPPM), which supports the sectors and the Directorate. The office of IPPM provides systems and management processes for institutional planning and performance assessment and evaluation, as well as leading multi-year, forward-looking planning and integration of institutional plans, programs, projects, operations and budgets. In addition the office of IPPM develops, implements and maintains integrated laboratory systems and management processes for strategic planning and goal setting, project and program oversight, enterprise risk management and performance planning and oversight. I received my B.S. degree from the US Naval Academy and Masters Degrees

107

Upgrade of CEBAF from 6 Gev To 12 Gev: Status  

SciTech Connect (OSTI)

The CEBAF accelerator is being upgraded from 6 GeV to 12 GeV by the US Department of Energy. The accelerator upgrade is being done within the existing tunnel footprint. The accelerator upgrade includes: 10 new srfbased high-performance cryomodules plus RF systems, doubling the 2K helium plant's capability, upgrading the existing beamlines to operate at nearly double the original performance envelope, and adding a beamline to a new experimental area. Construction is over 75% complete with final completion projected for late FY13. Details of the upgrade and status of the work will be presented.

Harwood, Leigh [Jefferson Lab, 12000 Jefferson Ave, Newport News, VA, 23606 (United States)

2013-04-19T23:59:59.000Z

108

Energy Star Building Upgrade Value Calculator | Open Energy Information  

Open Energy Info (EERE)

Energy Star Building Upgrade Value Calculator Energy Star Building Upgrade Value Calculator Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Energy Star Building Upgrade Value Calculator (for Office Properties) Agency/Company /Organization: ENERGY STAR Phase: "Evaluate Options and Determine Feasibility" is not in the list of possible values (Bring the Right People Together, Create a Vision, Determine Baseline, Evaluate Options, Develop Goals, Prepare a Plan, Get Feedback, Develop Finance and Implement Projects, Create Early Successes, Evaluate Effectiveness and Revise as Needed) for this property. User Interface: Spreadsheet Website: www.energystar.gov/index.cfm?c=comm_real_estate.building_upgrade_value The Building Upgrade Value Calculator allows practitioners to analyze the

109

The upgraded scheme of Hefei Light Source  

SciTech Connect (OSTI)

To enhance the performance of Hefei Light Source, which was designed and constructed two decades ago, an upgrade project would be carried out in the near future. The detail upgrade scheme was described in this paper. Firstly, the magnet lattice of storage ring should be reconstructed with 4 DBA cells, whose advantages are lower beam emittance and more straight section available for insertion devices. Secondly, the beam diagnostics, main power supply, transverse and longitudinal multi-bunch feedback, beam control and manipulation system would be upgrade to improve the beam orbit stability. Finally, the injection system of storage ring and injector, which is composed of electron linac and beam transfer line, would be updated in order to assure smooth beam accumulation process under new low emittance lattice. With above improvement, it is hopeful to increase the brilliance of Hefei Light Source by two orders approximately. After three-year upgrade project, the performance of HLS would meet the demands of advanced SR users.

Li Weimin; Xu Hongliang; Wang Lin; Feng Guangyao; Zhang Shancai; Hao Hao [National Synchrotron Radiation Laboratory of University of Science and Technology of China, Anhui (China)

2010-06-23T23:59:59.000Z

110

TO: Procurement Directors/Contracting Officers FROM: Director  

Broader source: Energy.gov (indexed) [DOE]

4 4 DATE: October 30 , 2013 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Continuing Appropriations Act, 2014 -- Congressional Notification of Pending Contract or Financial Assistance Actions in excess of $1 Million under the Continuing Resolution SUMMARY: Section 101(a)(6) of the Continuing Appropriations Resolution Act, 2014, Pub. L No. 113-46, makes appropriations available through January 15, 2014 for continuing projects or activities that were conducted under Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6, under the same authority and conditions. Therefore, the Section 311

111

Beam director design report  

SciTech Connect (OSTI)

A design and fabrication effort for a beam director is documented. The conceptual design provides for the beam to pass first through a bending and focusing system (or ''achromat''), through a second achromat, through an air-to-vacuum interface (the ''beam window''), and finally through the vernier steering system. Following an initial concept study for a beam director, a prototype permanent magnet 30/sup 0/ beam-bending achromat and prototype vernier steering magnet were designed and built. In volume II, copies are included of the funding instruments, requests for quotations, purchase orders, a complete set of as-built drawings, magnetic measurement reports, the concept design report, and the final report on the design and fabrication project. (LEW)

Younger, F.C.

1986-08-01T23:59:59.000Z

112

DOE/EIS-0169-SA-02: Supplement Analysis for Yakima Fisheries Project --Natural Spawning Channels, Increased On-site Housing and Upgrades to the Prosser Hatchery (8/16/99)  

Broader source: Energy.gov (indexed) [DOE]

August 16, 1999 August 16, 1999 REPLY TO ATTN OF: KEWI-4 SUBJECT: Supplement Analysis for Yakima Fisheries Project, DOE/EIS-0169-SA-02 David Byrnes Project Manager - KEWN-4 Proposed Action: Yakima Fisheries Project - Natural Spawning Channels, Increased On-site Housing, and Upgrades to the Prosser Hatchery PL-6: F3204 Location: Cle Elum Supplementation and Research Facility, Cle Elum, Washington (CESRF) and Prosser Juvenile Research Facility, Prosser, Washington Proposed by: Bonneville Power Administration (BPA) and Co-Managed by the Yakama Nation (YN) and the Washington Department of Fish and Wildlife (WDFW). 1. Introduction The Bonneville Power Administration (BPA) is funding ongoing studies, research, and artificial production of several salmonid species in the Yakima and Klickitat river basins. BPA analyzed

113

Los Alamos National Laboratory names Jeffrey Mousseau Associate Director of  

E-Print Network [OSTI]

has been hired as the new associate director for Environmental Programs. Mousseau currently works- 1 - Los Alamos National Laboratory names Jeffrey Mousseau Associate Director of Environmental Programs September 18, 2012 Will Oversee Transuranic Waste Disposal and Environmental Cleanup Projects LOS

114

Department of Energy Names Director for Office of Indian Energy...  

Office of Environmental Management (EM)

Names Director for Office of Indian Energy Policy and Makes Available 2 Million for Clean Energy Projects on Tribal Lands Department of Energy Names Director for Office of Indian...

115

APS Upgrade | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Workshop on new science opportunities provided by a multi-bend achromat lattice at the APS APS-U MBA Lattice Workshop Registration is now closed. Please contact Diane Wilkinson ext. 7810 or a member of the Workshop Organizing Committee for changes or modifications to your registration. Submit Comments, Suggestions, and Ideas for MBA Lattice Workshop October 21-22 Advanced Photon Source Argonne National Lab The Advanced Photon Source Upgrade is focused on delivering a powerful, versatile facility for science using high-brightness, high-energy X-rays. At APS, and around the light source community, scientists have been developing storage ring designs that push closer to the ultimate diffraction limit for X-ray sources. A recent report by the Basic Energy Sciences Advisory Committee, which advises the Director of the U.S.

116

Assistant Director -Drugs, Alcohol, &  

E-Print Network [OSTI]

Radiology Physical Therapy Medical Clinic Director of Medical Services Client Reception & Customer Services Resources Director of Business Services Dental Services Laboratory Services Women's Clinic Assistant

Rutledge, Steven

117

Irrigation Hardware Upgrades  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

because the water discharge point is closer to the ground reducing wind drift of the water. Efficiency upgrades are also available for wheel line hubs and levelers. Please...

118

Capturing Energy Upgrades  

Broader source: Energy.gov [DOE]

Provides an overview of how to capture the value of energy efficiency upgrades in the real estate market, from CNT Energy.

119

HUTTON NAMED NMFS ASSOCIATE DIRECTOR  

E-Print Network [OSTI]

, Fla.; from 1963 to 1965, Chief of Marine Biol ogy, Massachusetts De- partment of Natural Resource for Resource Utilization, has been named Associate Director. His responsibilities embrace: economic and marketing research on fishery products, including projections of demand and supply; foreign-trade analysis

120

Director | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Director Director Project Assessment (OPA) OPA Home About Director Staff & Responsibilities Location Project Management SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov About Director Print Text Size: A A A RSS Feeds FeedbackShare Page Click to enlarge photo. Enlarge Photo Daniel R. Lehman Daniel R. Lehman has served as Director of the Office of Project Assessment since June 1991. The majority of Mr. Lehman's over 30 years of Federal Service has been served within the Office of Science (formerly Energy Research). Mr. Lehman's key responsibilities include:

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

TO: Procurement Directors/Contracting Officers FROM: Director  

Broader source: Energy.gov (indexed) [DOE]

5 5 DATE: January15, 2014 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Determination of Benchmark Compensation Amount for Certain Executives and Employees (Update) SUMMARY: The purpose of this Flash is to update Policy Flash 2014-12 issued on December 28, 2013 to reflect the current Executive Compensation Cap pursuant to the Bipartisan Budget Act of 2013 (H.J.Res. 59) which was signed into law on December 26, 2013. The provision in Section 702 - "Limitation on allowable government contractor compensation costs"- limits how much a contractor could charge the federal government for an

122

EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade  

Broader source: Energy.gov (indexed) [DOE]

7: Idaho National Engineering Laboratory Sewer System Upgrade 7: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho SUMMARY This EA evaluates the environmental impacts of a proposal to upgrade the Sewer System at the U.S. Department of Energy's Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho. The proposed action would include activities conducted at the Central Facilities Area, Test Reactor Area, and the Containment Test Facility at the Test Area North at INEL. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 1, 1994 EA-0907: Finding of No Significant Impact Idaho National Engineering Laboratory Sewer System Upgrade Project

123

Los Alamos National Laboratory remembers former director Harold...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

He was the third director of Los Alamos National Laboratory, succeeding Robert Oppenheimer and Norris Bradbury. He served from 1970 to 1979. Joined Manhattan Project in 1943...

124

Innovative Technology Improves Upgrading Process for Unconventional Oil  

Broader source: Energy.gov (indexed) [DOE]

Innovative Technology Improves Upgrading Process for Unconventional Innovative Technology Improves Upgrading Process for Unconventional Oil Resources Innovative Technology Improves Upgrading Process for Unconventional Oil Resources April 9, 2013 - 1:57pm Addthis Washington, DC - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology.

125

Innovative Technology Improves Upgrading Process for Unconventional Oil  

Broader source: Energy.gov (indexed) [DOE]

Technology Improves Upgrading Process for Unconventional Technology Improves Upgrading Process for Unconventional Oil Resources Innovative Technology Improves Upgrading Process for Unconventional Oil Resources April 9, 2013 - 1:57pm Addthis Washington, DC - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology. Heavy oil is crude oil that is viscous and requires thermally enhanced oil

126

Weapons Program Associate Directors named  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program Associate Directors named Bob Webster has been named Associate Director for Weapon Physics and John Benner has been named Associate Director for Weapon Engineering and...

127

Line Rebuild, Relocation and Substation Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrade Palisades-Goshen Rebuild Wind Projects Line Rebuild, Relocation and Substation Projects BPA has identified several critical rebuild and substation projects...

128

Biofuels : Upgraded New Solids  

Science Journals Connector (OSTI)

The main historical keywords for the three pathways are: Agglomeration: Briquettes are long-established upgraded solid fuels, especially based on coal. 1970s: first small scale pellet heating units build in t...

Dr. Marco Klemm; Ralf SchmersahlÖ

2012-01-01T23:59:59.000Z

129

Biofuels : Upgraded New Solids  

Science Journals Connector (OSTI)

The main historical keywords for the three pathways are: Agglomeration: Briquettes are long-established upgraded solid fuels, especially based on coal. 1970s: first small scale pellet heating units build in t...

Dr. Marco Klemm; Ralf Schmersahl; Dr. Claudia KirstenÖ

2013-01-01T23:59:59.000Z

130

Director's Office | Stanford Synchrotron Radiation Lightsource  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Director's Office Kelly Gaffney, SSRL Director Chi-Chang Kao, Associate Laboratory Director Kelly Gaffney, SSRL Director Email: Kelly Gaffney, SLAC Associate Laboratory Director...

131

Office of Science Approves Critical Decision 1 for APS Upgrade...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed Office of Science Approves Critical Decision 1 for APS Upgrade Project SEPTEMBER 15, 2011...

132

Financing; A Cost Effective Alternative When Upgrading Energy Efficient Systems  

E-Print Network [OSTI]

in order to effectively compete in the marketplace. One obvious method of reducing costs and improving productivity is to upgrade old, antiquated equipment such as lighting to more modern energy efficient systems. Most projects provide a return...

Ertle, J. M.

133

Instrumentation upgrades for the Macromolecular Crystallography beamlines  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Instrumentation upgrades for the Macromolecular Crystallography beamlines Instrumentation upgrades for the Macromolecular Crystallography beamlines of the Swiss Light Source Monday, October 29, 2012 - 2:00am SSRL, Bldg. 137, Rm. 322 Martin Fuchs, MX Group, Swiss Light Source; Paul Scherrer Institute (Villigen, Switzerland) A new unified diffractometer - the D3 - has been developed for the three MX beamlines. The first of the instruments is in general user operation at beamline X10SA since April 2012. The varied demands from both challenging academic research projects as well as high throughput industrial applications on today's macromolecular crystallography beamlines drive developments to both endstations and beamline optics. Recent instrumentation upgrades to the macromolecular crystallography (MX) beamlines of the Swiss Light Source therefore aimed to

134

Project Management Lessons Learned  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and aids the federal project directors and integrated project teams in the execution of projects.

2008-08-05T23:59:59.000Z

135

Fermilab | Directorate | Director Profiles | Steve Geer  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Steve Geer Steve Geer Head, Program Planning Office I am currently Head of the Program Planning Office within the Fermilab Directorate, which coordinates the experimental physics program carried out at the Laboratory. The office provides a link between ongoing and planned experiments and the Directorate, by: Acting as liaison between experimenters and laboratory staff regarding beam conditions during accelerator operation. Establishing priorities between accelerator studies and experiments and among experiments, in consultation with the Director, and resolving conflicting requests from experiments. Coordinating Division and Section reviews of draft Memoranda of Understanding for approved experiments. Coordinating updates to the "Procedures for Researchers" which

136

Upgrading Below Grade Spaces  

Broader source: Energy.gov (indexed) [DOE]

Patrick H. Huelman, Sam Breidenbach, Steve Schirber Patrick H. Huelman, Sam Breidenbach, Steve Schirber NorthernSTAR Building America Partnership Upgrading Below Grade Spaces Residential Energy Efficiency Stakeholder March 1, 2012 Austin, TX * Act 1: Technical Challenges & Opportunities - Pat Huelman, University of Minnesota * Act 2: Assessing Homeowner Priorities & Risks - Sam Breidenbach, TDS Custom Construction * Act 3: An Industry Perspective - Steve Schirber, Cocoon Act 1. Upgrade Below Grade * Basement Remodeling: It Doesn't Get Any Riskier! - Combustion safety - Foundation moisture - Radon (& other soil gases) - Biologicals (mold, dust mites, etc.) - Garage gases (if attached) * And front and center are uncontrolled... - negative pressures in basements (beyond stack)

137

Environmental Assessment and Finding of No Significant Impact: Wastewater Treatment Capability Upgrade, Project NO. 96-D-122 Pantex Plant Amarillo, Texas  

SciTech Connect (OSTI)

This Environmental Assessment (EA) addresses the U.S. Department of Energy (DOE) proposed action regarding an upgrade of the Pantex Plant Wastewater Treatment Facility (WWTF). Potential environmental consequences associated with the proposed action and alternative actions are provided. DOE proposes to design, build, and operate a new WWTF, consistent with the requirements of Title 30 of the Texas Administrative Code (TAC), Chapter 317, ''Design Criteria for Sewage Systems,'' capable of supporting current and future wastewater treatment requirements of the Plant. Wastewater treatment at Pantex must provide sufficient operational flexibility to meet Pantex Plant's anticipated future needs, including potential Plant mission changes, alternative effluent uses, and wastewater discharge permit requirements. Treated wastewater effluent and non-regulated water maybe used for irrigation on DOE-owned agricultural land. Five factors support the need for DOE action: (1) The current WWTF operation has the potential for inconsistent permit compliance. (2) The existing WWTF lies completely within the 100-year floodplain. (3) The Pantex Plant mission has the potential to change, requiring infrastructure changes to the facility. (4) The life expectancy of the existing facility would be nearing its end by the time a new facility is constructed. (5) The treated wastewater effluent and non-regulated water would have a beneficial agricultural use through irrigation. Evaluation during the internal scoping led to the conclusion that the following factors are present and of concern at the proposed action site on Pantex Plant: (1) Periodic wastewater effluent permit exceedances; (2) Wetlands protection and floodplain management; (3) Capability of the existing facility to meet anticipated future needs of Pantex (4) Existing facility design life; and (5) Use of treated wastewater effluent and non-regulated water for irrigation. Evaluation during the internal scoping led to the conclusion that the following conditions are not present, nor of concern at the proposed site on Pantex Plant, and no further analysis was conducted: (1) State or national parks, forests, or other conservation areas; (2) Wild and scenic rivers; (3) Natural resources, such as timber, range, soils, minerals; (4) Properties of historic, archeological, or architectural significance; (5) Native American concerns; (6) Minority and low-income populations; and (7) Prime or unique farmland. In this document, DOE describes the proposed action and a reasonable range of alternatives to the proposed action, including the ''No-Action'' alternative. The proposed action cited in the ''U.S. Department of Energy Application for a Texas Pollutant Discharge Elimination System Permit Modifying Permit to Dispose of Waste, No. 02296,'' December 1998, included the construction of a new wastewater treatment facility, a new irrigation storage pond, and the conversion of the current wastewater treatment facility into an irrigation storage pond. Although a permit modification application has been filed, if a decision on this EA necessitates it, an amendment to the permit application would be made. The permit application would be required for any of the alternatives and the filing does not preclude or predetermine selection of an alternative considered by this EA. This permit change would allow Pantex to land-dispose treated wastewater by irrigating agricultural land. This construction for the proposed action would include designing two new lagoons for wastewater treatment. One of the lagoons could function as a facultative lagoon for treatment of wastewater. The second lagoon would serve as an irrigation storage impoundment (storage pond), with the alternative use as a facultative lagoon if the first lagoon is out of service for any reason. The new facultative lagoon and irrigation water storage pond would be sited outside of the 100-year flood plain. The existing WWTF lagoon would be used as a storage pond for treated wastewater effluent for irrigation water, as needed. The two new lagoons would be li

N /A

1999-05-27T23:59:59.000Z

138

15 - Biogas upgrading to biomethane  

Science Journals Connector (OSTI)

Abstract: Compared with other utilization paths of biogas, upgrading of biogas to biomethane offers several advantages and has thus become of increased relevance in the last decade. This chapter describes past developments as well as the current state of upgrading, especially in Europe. Specifics of biogas cleaning combined with biogas upgrading will be described. The chapter focuses on technical aspects of upgrading and off-gas treatment methods as well as on economic aspects of biomethane provision.

Michael Beil; Wiebke Beyrich

2013-01-01T23:59:59.000Z

139

Biochemical upgrading of oils  

DOE Patents [OSTI]

A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed. 121 figs.

Premuzic, E.T.; Lin, M.S.

1999-01-12T23:59:59.000Z

140

APS Upgrade | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

APS APS View Larger The brightness and energy of x-ray beams are critical properties for research. Higher brightness means more x-rays can be focused onto a smaller, laser-like spot, allowing researchers to gather more data in greater detail in less time. Higher energies allow x-rays to penetrate deeper inside materials to reveal crucial information about a material's structure and function. The combination of high brightness and high energy allows the observation and imaging - in real time - of fast and ultrafast technologically important processes, including fuel sprays, magnetic switching, and biological processes in living organisms. The APS Upgrade project will increase the brightness of the APS high-energy (hard) x-ray beams. This will equip researchers for the groundbreaking

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

CEES Directorate & Principal Investigators  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management Director photo of Paul Fenter Name Paul Fenter Institution Argonne National Laboratory Department Chemical Sciences and Engineering Division Area of Focus Interfacial...

142

Photon Sciences | About the Photon Sciences Directorate  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About the Photon Sciences Directorate About the Photon Sciences Directorate The Photon Sciences Directorate operates the National Synchrotron Light Source (NSLS) and is constructing the National Synchrotron Light Source II (NSLS-II), both funded by the Department of Energy Office of Science. These facilities support a large community of scientists using photons (light) to carry out research in energy and environmental sciences, physics, materials science, chemistry, biology and medicine. NSLS National Synchrotron Light Source NSLS-II National Synchrotron Light Source II This is a very exciting period for photon sciences at Brookhaven Lab and a time of unprecedented growth for the directorate. The NSLS-II Project is progressing rapidly and smoothly through design and construction, driven by

143

Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure |  

Broader source: Energy.gov (indexed) [DOE]

Case Study - Energy Efficiency Upgrades for Fermilab Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure October 7, 2013 - 3:29pm Addthis Utility energy service contracting provides needed plant improvements. Photo of Project Coordinator Steve Krstulovich with Fermilab's new 1400-ton, high-efficiency chiller. Project Coordinator Steve Krstulovich with Fermilab's new 1400-ton, high-efficiency chiller. Overview The U.S. Department of Energy's (DOE's) Fermi National Accelerator Laboratory (Fermilab) has replaced old equipment and reduced energy consumption through a partnership with its electric utility, Commonwealth Edison. Fermilab upgraded the centralized cooling system and separated the system into two segments - a "comfort system" to cool the employee office

144

Superconducting RF Lab Facility Upgrades at Los Alamos  

SciTech Connect (OSTI)

Research and testing of multi-cell superconducting cavities demands extensive contamination control resources to achieve high-cavity fields. Facility upgrades at Los Alamos National Laboratory (LANL) included the modernization of test equipment, expanding and modernizing cleanroom facilities, improving safety, and expanding the high-pressure rinse cleaning process equipment. Each upgrade was integrated into the facility to enable users to assemble prototype cryomodules. The scope of the upgrades, the new installed capability, and budget and schedule for certain aspects of the project are discussed in this paper.

Katonak, D.J.; Rusnak, B.

1999-03-01T23:59:59.000Z

145

Fermilab | Directorate | Director Profiles | Nigel Lockyer  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Nigel Lockyer Nigel Lockyer Laboratory Director Nigel Lockyer began his tenure as director of Fermi National Accelerator Laboratory, America’s premier laboratory for particle physics research, on September 3, 2013. An experimental particle physicist, Lockyer was most recently director of TRIUMF, Canada’s national laboratory for particle and nuclear physics. He was also a professor of physics and astronomy at the University of British Columbia. Under his leadership, TRIUMF formulated a vision for ascending the world stage in nuclear physics using rare-isotope beams to address some of the most fundamental questions in science. Lockyer expanded the laboratory’s operations by 25 percent, earning a reputation as a national leader and team-builder. He also developed a strong working partnership among

146

Fermilab | Directorate | Director Profiles | Martha Michels  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Martha Michels Martha Michels Director for ESH&Q and Head of the ESH&Q Section As the Director for ESH&Q and Head of the ESH&Q Section, Michels is responsible for the management and direction of Fermi National Accelerator Laboratory’s environment, safety and health programs. She ensures that ESH&Q is integrated into all activities within the line organizations in an effective and efficient manner. Michels assists the Directorate in assessing the resource needs and priorities of the Laboratory concerning ESH&Q. She represents the lab on ESH&Q issues with the Department of Energy, government and non-government agencies and other national laboratories. Michels owns the ESH&Q Management System, which establishes and maintains ESH&Q policies and procedures. She assesses line organizations for

147

MEMORANDUM FOR FEDERAL PROCUREMENT DIRECTORS FROM: DIRECTOR  

Broader source: Energy.gov (indexed) [DOE]

2009 2009 MEMORANDUM FOR FEDERAL PROCUREMENT DIRECTORS FROM: DIRECTOR OFFICE OF PROCUREMENT AND ASSISTANCE MANAGEMENT SUBJECT: Changes to the Balanced Scorecard Program The Balanced Scorecard (BSC) performance management methodology has played a significant role in helping the Office of Procurement and Assistance Management assess the performance of the Department's Federal procurement offices and the purchasing organizations of its major site and facility contractors. This methodology provides the conceptual framework for creating, communicating, collecting and arraying performance objectives, measures, targets, and initiatives. Over the years, we have used the BSC assessment results to identify and monitor desired organizational changes, to expose problem areas needing management attention, to

148

TO: Procurement Directors FROM: Director, Policy Division  

Broader source: Energy.gov (indexed) [DOE]

6 6 DATE: April 14, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: DOE 2011 Continuity of Operations (COOP) Awareness Briefing Available to Contractors SUMMARY: For each contract requiring or involving responsibility for work or operations at DOE/NNSA sites or facilities that support or perform essential functions/activities that directly support National Essential Functions (NEF), Mission Essential Functions (MEF), Primary Mission Essential Functions (PMEF), or Essential Supporting Activities (ESA) the Contractor Requirements Document (CRD) DOE Order 150.1, Continuity Programs, sets forth the contractor responsibility for a Continuity of

149

ATLAS Upgrades Towards the High Luminosity LHC  

E-Print Network [OSTI]

After successful LHC operation at the center-of-mass energy of 7 and 8 TeV in 2011 and 2012, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the data set from about few hundred fb?1 expected for LHC running to 3000 fb?1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon systems, as well as improved triggers and data a...

Cinca, D; The ATLAS collaboration

2014-01-01T23:59:59.000Z

150

SLHC, the High-Luminosity Upgrade (public event)  

ScienceCinema (OSTI)

In the morning of June 23rd a public event is organised in CERN's Council Chamber with the aim of providing the particle physics community with up-to-date information about the strategy for the LHC luminosity upgrade and to describe the current status of preparation work. The presentations will provide an overview of the various accelerator sub-projects, the LHC physics prospects and the upgrade plans of ATLAS and CMS. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the LHC High Luminosity Upgrade project. Informing the public is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

None

2011-10-06T23:59:59.000Z

151

TO: Procurement Directors/Contracting Officers FROM: Director  

Broader source: Energy.gov (indexed) [DOE]

8 DATE: August 11, 2014 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and...

152

TO: Procurement Directors/Contracting Officers FROM: Director  

Office of Environmental Management (EM)

POLICY FLASH 2014-31 DATE: May 30, 2014 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of...

153

TO: Procurement Directors/Contracting Officers FROM: Director  

Broader source: Energy.gov (indexed) [DOE]

POLICY FLASH 2014-37 DATE: August 13, 2014 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office...

154

TO: Procurement Directors/Contracting Officers FROM: Director  

Broader source: Energy.gov (indexed) [DOE]

5 DATE: January15, 2014 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and...

155

TO: Procurement Directors/Contracting Officers FROM: Director  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

3 DATE: October 6, 2014 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and...

156

TO: Procurement Directors/Contracting Officers FROM: Director  

Broader source: Energy.gov (indexed) [DOE]

4 DATE: July 7, 2014 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and...

157

TO: Procurement Directors/Contracting Officers FROM: Director  

Broader source: Energy.gov (indexed) [DOE]

6 DATE: May 5, 2014 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and...

158

TO: Procurement Directors/Contracting Officers FROM: Director  

Energy Savers [EERE]

7 DATE: December 12, 2014 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and...

159

TO: Procurement Directors/Contracting Officers FROM: Director  

Broader source: Energy.gov (indexed) [DOE]

0 DATE: May 30, 2014 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and...

160

TO: Procurement Directors/Contracting Officers FROM: Director  

Broader source: Energy.gov (indexed) [DOE]

4 DATE: January 15, 2014 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and...

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

T Plant secondary containment and leak detection upgrades  

SciTech Connect (OSTI)

The W-259 project will provide upgrades to the 2706-T/TA Facility to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. The project provides decontamination activities supporting the environmental restoration mission and waste management operations on the Hanford Site.

Carlson, T.A.

1995-10-19T23:59:59.000Z

162

Project X Community  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

X Community Fermilab Home | Fermilab at Work | Fermilab Directorate Home Project X Muon Collider Steering Group Report (2007) P5 Report (2008) Physics 4th Physics Workshop -...

163

Applicant DOE Award Project Location Project Focus Feasibility...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Authority (THRHA) 898,772 Juneau, AK The project will provide energy assessments, alternative energy monitoring, and energy conservation upgrades for low-income,...

164

Laboratory Director PRINCETON PLASMA PHYSICS LABORATORY  

E-Print Network [OSTI]

.D. Levine Dep: R. Sheneman Human Resources Director: S.E. Murphy­ LaMarche Best Practices and Outreach Head Projects: HTX, MNX,OSOR Beam Dynamics and Non-Neutral Plasmas R.C. Davidson Best Practices J. Graham Environmental Services Division R. Sheneman Accounting A.F. Bleach Procurement R. Templon Mechanical P

Princeton Plasma Physics Laboratory

165

Global Scratch Upgrade in Progress  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Global Scratch Gets Global Scratch Gets an Upgrade Global Scratch Gets an Upgrade Improvements Will Include Higher Data Output Rates, Connection to PDSF October 29, 2013 The most used file system at the National Energy Research Scientific Computing Center (NERSC)-global scratch-just got an upgrade. As a result, some users may see their data output to global scratch reach up to 80 gigabytes per second. Although users will probably not see their 20-terabyte storage quotas increase, the upgrade ensures that global scratch remains flexible and paves the way for PDSF to eventually use the file system Because of the upgrade, users will also be able to better access their temporary data files or "scratch data" from any NERSC system, not just the one that generated it. Prior to the upgrade, Global scratch typically

166

The PS Upgrade Program: Recent Advances  

E-Print Network [OSTI]

The LHC Injectors Upgrade project (LIU) has been initiated to improve the performances of the existing injector complex at CERN to match the future requirements of the HL-LHC (High Luminosity LHC). In this framework, the Proton Synchrotron (PS) will undergo fundamental changes for many of its main systems: the injection energy will be increased to reduce space-charge effects, the transverse damper will be improved to cope with transverse instabilities, and the RF systems will be upgraded to accelerate higher beam intensity and brightness. These hardware improvements are triggered by a series of studies meant to identify the most critical performance bottlenecks, like space charge, impedances, longitudinal and transverse instabilities, as well as electron-cloud. Additionally, alternative production schemes for the LHC-type beams have been proposed and implemented to circumvent some of the present limitations. A summary of the most recent advances of the studies, as well as the proposed hardware improvements is...

Gilardoni, SS; Bertone, C; Biancacci, N; Blas, A; Damjanovic, S; Bodart, D; Borburgh, J; Chiggiato, P; Damerau, H; Devine, JD; Dobers, T; Gourber-Pace, M; Hancock, S; Huschauer, A; Iadarola, G; Lopez Hernandez, LA; Masi, A; Mataguez, S; Mīetral, E; Paoluzzi, M; Persichelli, S; Pittet, S; Rossi, C; Roesler, S; Rumolo, G; Salvant, B; Steerenberg, R; Sterbini, G; Vollaire, J; Wasef, R; Ventura, L; Yin Vallgren, C; Migliorati, M

2013-01-01T23:59:59.000Z

167

Global Scratch Upgrade in Progress  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the facility is now positioned to meet the performance demands of all its clusters. By upgrading the consolidated Global Scratch, users will be able to continue taking advantage...

168

SRS upgrades helium recovery system | National Nuclear Security  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

upgrades helium recovery system | National Nuclear Security upgrades helium recovery system | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > SRS upgrades helium recovery system SRS upgrades helium recovery system Posted By Office of Public Affairs Savannah River Site (SRS) Tritium Programs recently completed a project to design, build and relocate a new system for separating and capturing

169

Federal Finance Facilities Available for Energy Efficiency Upgrades and  

Broader source: Energy.gov (indexed) [DOE]

Federal Finance Facilities Available for Energy Efficiency Upgrades Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment "Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment" is a resource guide that lists the various federal financing programs for which energy efficiency and clean energy qualify - meant to make it easier for state, local and tribal leaders, along with their partners in the private sector, to find capital for energy efficiency and clean energy projects. This first-edition guide is a product of a cooperative effort among seven federal agencies, including the U.S. Departments of Agriculture, Energy, Housing and Urban Development, Transportation and Treasury, along with the

170

Federal Finance Facilities Available for Energy Efficiency Upgrades and  

Broader source: Energy.gov (indexed) [DOE]

Federal Finance Facilities Available for Energy Efficiency Upgrades Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment "Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment" is a resource guide that lists the various federal financing programs for which energy efficiency and clean energy qualify - meant to make it easier for state, local and tribal leaders, along with their partners in the private sector, to find capital for energy efficiency and clean energy projects. This first-edition guide is a product of a cooperative effort among seven federal agencies, including the U.S. Departments of Agriculture, Energy, Housing and Urban Development, Transportation and Treasury, along with the

171

Energy Efficiency Upgrades Part of Winning Formula for Oregon School  

Broader source: Energy.gov (indexed) [DOE]

Upgrades Part of Winning Formula for Oregon Upgrades Part of Winning Formula for Oregon School District Energy Efficiency Upgrades Part of Winning Formula for Oregon School District August 27, 2012 - 9:45am Addthis The community of Vernonia, OR, celebrates the opening of a new energy efficient school. | Photo courtesy of April Baer, OPB. The community of Vernonia, OR, celebrates the opening of a new energy efficient school. | Photo courtesy of April Baer, OPB. Todd G. Allen Project Officer, Golden Field Office What are the key facts? Energy efficiency upgrades will reduce the Vernonia school district's energy usage by 43 percent and save taxpayers more than $62,000 a year. The school will also serve as a laboratory for forest technologies

172

Lowell, Massachusetts, Preserves Historic Home Through Energy Upgrades  

Broader source: Energy.gov [DOE]

Artist James MacNeil Whistler's birthplace home in Lowell, Massachusetts, was built in 1823 and now houses the Lowell Art Association. The house was in need of a series of upgrades that improved energy efficiency while catering to the specific needs of a historic home and museum. Through the BetterBuildings Lowell Energy Upgrade program, the historic house will receive upgrades that include a high-velocity, small-duct HVAC system, updated storm windows, and attic insulation. These upgrades will reduce humidity in order to preserve the artwork displayed, and catch up to modern electrical demand without sacrificing the home's historic characteristicsóall while providing energy savings of more than 30%. To learn more about how the project was financed and further details on the innovative HVAC equipment, read the original post from Lowell's Office of the Mayor's blog.

173

TO: Procurement Directors FROM: Director, Policy Division  

Broader source: Energy.gov (indexed) [DOE]

POLICY FLASH 2011-56 POLICY FLASH 2011-56 DATE: March 16, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Publication of Federal Acquisition Circular 2005-50 SUMMARY: Attached for your information is a summary of Federal Acquisition Circular 2005-50 which makes miscellaneous changes to the Federal Acquisition Regulation. We are reviewing Item II for possible changes we may need to make in DOE Acquisition Guide Chapter 38. This Flash and its attachment will be available online within a day, at the following website: http://www.management.energy.gov/policy_guidance/policy_flashes.htm. Federal Acquisition Circulars may be found, in both their Federal Register notice form

174

TO: Procurement Directors FROM: Director, Policy Division  

Broader source: Energy.gov (indexed) [DOE]

5 5 DATE: May 18, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Guide Chapter 8.4 - Federal Supply Schedules and Chapter 16.5 - Multiple-award Contracts and Governmentwide Acquisition Contracts Including Delivery Orders and Task Orders SUMMARY: Acquisition Guide Chapters 8.4 - Federal Supply Schedules and 16.5 - Multiple- Award Contracts and Governmentwide Acquisition Contracts Including Delivery Orders and Task Orders replace Chapter 38.1 Strategic Acquisition Transactions. The new chapters include revisions from Federal Acquisition Circular (FAC) 2005-50 to Federal Acquisition Regulation (FAR) Subparts 8.4 and 16.5.

175

TO: Procurement Directors FROM: Director, Policy Division  

Broader source: Energy.gov (indexed) [DOE]

83 83 DATE: June 15, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Guide Chapter 8.4 - Federal Supply Schedules SUMMARY: Acquisition Guide Chapters 8.4 - Federal Supply Schedules is revised to provide guidance on how to issue a request for quotation and receive quotes when using e-Buy. STRIPES is DOE's repository for all acquisition and financial assistance actions. As such, all requests for quotation (RFQ) should be issued and quotes received through STRIPES/FedConnect and not e-Buy. In lieu of uploading the RFQ to e-Buy, contracting officers will post a file that instructs FSS holders to go to www.FedConnect.net to locate the

176

TO: Procurement Directors FROM: Director, Policy Division  

Broader source: Energy.gov (indexed) [DOE]

40 40 DATE: February 9, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Issue a New Department of Energy Acquisition Guide Chapter 6.5 Competition Advocate Responsibilities and Revise Pages in Chapters 6.1 and 7.1. SUMMARY: Attached is a new chapter of the DOE Acquisition Guide entitled Competition Advocate Responsibilities. It provides a comprehensive overview of the topic. The new chapter necessitates page changes to Chapters 6.1 and 7.1. Chapter 6.1 has been revised to advise the contracting officer that for actions less than $650,000, the contracting officer is highly encouraged to have the Contracting Activity Competition Advocate review

177

TO: Procurement Directors FROM: Director, Policy Division  

Broader source: Energy.gov (indexed) [DOE]

4 4 DATE: April 7, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Publication of Federal Acquisition Circular 2005-51 SUMMARY: Attached for your information is a summary of Federal Acquisition Circular 2005-51 which makes two changes to the Federal Acquisition Regulation involving the small business program and a modification of Standard Form 26. This Flash and its attachment will be available online within a day, at the following website: http://www.management.energy.gov/policy_guidance/policy_flashes.htm. Federal Acquisition Circulars may be found, in both their Federal Register notice form and in loose leaf form at: https://www.acquisition.gov/far/.

178

Upgraded Coal Interest Group  

SciTech Connect (OSTI)

The Upgraded Coal Interest Group (UCIG) is an EPRI 'users group' that focuses on clean, low-cost options for coal-based power generation. The UCIG covers topics that involve (1) pre-combustion processes, (2) co-firing systems and fuels, and (3) reburn using coal-derived or biomass-derived fuels. The UCIG mission is to preserve and expand the economic use of coal for energy. By reducing the fuel costs and environmental impacts of coal-fired power generation, existing units become more cost effective and thus new units utilizing advanced combustion technologies are more likely to be coal-fired.

Evan Hughes

2009-01-08T23:59:59.000Z

179

From the Director  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

From the Director From the Director From the Director LANL's mission is to develop and apply science and technology to ensure the safety, security, and reliability of the U.S. nuclear deterrent; reduce global threats; and solve other emerging national security and energy challenges. Contact Operator Communications & Government Affairs (505) 667-7000 Our people are highly trained, creative, and innovative. They have one-of-a-kind facilities to accomplish work that very few people in the world can do. We have a vibrant student and postdoctoral program because they are the talent who will solve the problems our predecessors only dreamed of. Director's message Charles McMillan Los Alamos National Laboratory has played a role in some of the most transformational discoveries of the 20th and 21st centuries.

180

Senior Director Student Development  

E-Print Network [OSTI]

Senior Director Student Development & Services Janet Teasdale Assistant to the Vice President, Conferences & Food Operations (dual campus) Andrew Parr Chaplains Roberta Fraser Inter-Fraternity & Panhellenic Community Service Learning Margot Fryer Alma Mater Society UBCV Graduate Student Society UBCV

Michelson, David G.

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Director, Physics Research Division  

Broader source: Energy.gov [DOE]

The Department of Energy, Office of Science, Office of the Deputy Director for Science Programs, Office of Nuclear Physics is seeking a motivated and highly qualified individual to service as the...

182

Energy Innovation Hub Directors Visit the Hill | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Energy Innovation Hub Directors Visit the Hill Energy Innovation Hub Directors Visit the Hill Energy Innovation Hub Directors Visit the Hill April 24, 2013 - 5:39pm Addthis Rep. Chaka Fattah (D-PA) and Acting Secretary of Energy Daniel Poneman speak during an event on Capitol Hill featuring the directors of the five energy innovation hubs. | Energy Department video. Ben Dotson Ben Dotson Project Coordinator for Digital Reform, Office of Public Affairs What is an Energy Innovation Hub? Modeled after the strong scientific management characteristics of the Manhattan Project and AT&T Bell Laboratories, the Energy Innovation Hubs are integrated research centers that combine basic and applied research with engineering to accelerate scientific discovery that addresses critical energy issues. Yesterday, the directors of the Energy Department's Energy Innovation Hubs

183

Energy Innovation Hub Directors Visit the Hill | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Directors Visit the Hill Directors Visit the Hill Energy Innovation Hub Directors Visit the Hill April 24, 2013 - 5:39pm Addthis Rep. Chaka Fattah (D-PA) and Acting Secretary of Energy Daniel Poneman speak during an event on Capitol Hill featuring the directors of the five energy innovation hubs. | Energy Department video. Ben Dotson Ben Dotson Project Coordinator for Digital Reform, Office of Public Affairs What is an Energy Innovation Hub? Modeled after the strong scientific management characteristics of the Manhattan Project and AT&T Bell Laboratories, the Energy Innovation Hubs are integrated research centers that combine basic and applied research with engineering to accelerate scientific discovery that addresses critical energy issues. Yesterday, the directors of the Energy Department's Energy Innovation Hubs

184

Work Authorization Document NSTX Upgrade Project  

E-Print Network [OSTI]

-NBI-Control & Instm 5 08JUN10A 08JUN10A 14JUN10A 14JUN10A 0 0.00 100 0.00 0.00 2475-0004 FMEA Analysis

Princeton Plasma Physics Laboratory

185

Work Authorization Document NSTX Upgrade Project  

E-Print Network [OSTI]

01JUN10A 0 0.00 100 0.00 0.00 1000-0008 Fault, FMEA evaluation and analyses 21 03MAY10A 03MAY10A 0110A 25FEB11 18MAY11 -58 147 18,651.56 75 13,823.15 18,430.86 1000-0017 Fault, FMEA analyses (LOE) 220

Princeton Plasma Physics Laboratory

186

Delegation Order No. 00-038.00B to the Director of the Advanced...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Chu, Secretary of Energy Delegate: Director of the Advanced Research Projects Agency - Energy Status: Current Effective Date: Jan 06, 2012 Re-delegation Allowed: No...

187

2 MW upgrade of the Fermilab Main Injector  

SciTech Connect (OSTI)

In January 2002, the Fermilab Director initiated a design study for a high average power, modest energy proton facility. An intensity upgrade to Fermilab's 120-GeV Main Injector (MI) represents an attractive concept for such a facility, which would leverage existing beam lines and experimental areas and would greatly enhance physics opportunities at Fermilab and in the U.S. With a Proton Driver replacing the present Booster, the beam intensity of the MI is expected to be increased by a factor of five. Accompanied by a shorter cycle, the beam power would reach 2 MW. This would make the MI a more powerful machine than the SNS or the J-PARC. Moreover, the high beam energy (120 GeV) and tunable energy range (8-120 GeV) would make it a unique high power proton facility. The upgrade study has been completed and published. This paper gives a summary report.

Weiren Chou

2003-06-04T23:59:59.000Z

188

Upgrading the Vanadium Redox Battery | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrading the Vanadium Redox Battery Upgrading the Vanadium Redox Battery New electrolyte mix increases energy storage by 70 percent After developing a more effective...

189

Proposal to upgrade the MIPP experiment  

SciTech Connect (OSTI)

The upgraded MIPP physics results are needed for the support of NuMI projects, atmospheric cosmic ray and neutrino programs worldwide and will permit a systematic study of non-perturbative QCD interactions. The MIPP TPC is the largest contributor to the MIPP event size by far. Its readout system and electronics were designed in the 1990's and limit it to a readout rate of 60 Hz in simple events and {approx} 20 Hz in complicated events. With the readout chips designed for the ALICE collaboration at the LHC, we propose a low cost scheme of upgrading the MIPP data acquisition speed to 3000 Hz. This will also enable us to measure the medium energy numi target to be used for the NOvA/MINERvA experiments. We outline the capabilities of the upgraded MIPP detector to obtain high statistics particle production data on a number of nuclei that will help towards the understanding and simulation of hadronic showers in matter. Measurements of nitrogen cross sections will permit a better understanding of cosmic ray shower systematics in the atmosphere. In addition, we explore the possibilities of providing tagged neutral beams using the MIPP spectrometer that may be crucial for validating the Particle Flow Algorithm proposed for calorimeters for the International Linear Collider detectors. Lastly, we outline the physics potential of such a detector in understanding non-perturbative QCD processes.

Isenhower, D.; Sadler, M.; Towell, R.; Watson, S.; /Abilene Christian U.; Peterson, R.J.; /Colorado U.; Baker, W.; Carey, D.; Christian, D.; Demarteau, M.; Jensen, D.; Johnstone, C.; Meyer, H.; Raja, R.; Ronzhin, A.; Solomey, N.; Wester, W.; /Fermilab; Gutbrod, H.; Peters, K.; /Darmstadt, GSI; Feldman, G.; /Harvard U.; Torun, Y.; /IIT, Chicago; Messier, M.D.; /Indiana U. /Iowa U. /Dubna, JINR /Kent State U. /Groningen, KVI /Michigan U. /St. Petersburg, INP /Purdue U. /South Carolina U. /Virginia U. /Wisconsin U., Madison

2006-09-01T23:59:59.000Z

190

Microsoft Word - CX-AlveyMaintenanceHQ_PoleStorageUpgrade_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

4 4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Environmental protection system upgrades at pole storage facility at Alvey Maintenance Headquarters. Budget Information: Work Order #00283226 Categorical Exclusion Applied (Appendix B to Subpart D, 10 C.F.R. Part 1021): B4.6: Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms.

191

Microsoft Word - CX-HatwaiSubstationUpgradesFY11_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

18, 2011 18, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of secondary containment facilities at Hatwai Substation Budget Information: Work Order: 00004952 Categorical Exclusion Applied (Appendix B to Subpart D, 10 C.F.R. Part 1021): B4.6: Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to: switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms.

192

County Partners with Siemens on Energy Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Partners with Siemens on Energy Upgrades Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades July 9, 2010 - 11:11am Addthis What does this project do? Allows McHenry County to install cutting edge technology to reduce our energy costs. When you're really committed to energy efficiency and looking at $118,000 in potential energy savings annually, you want to share it. That's the view in McHenry County, Ill., which partnered with Siemens Building Technologies to launch mchenrycounty-eecbg.net to let residents understand the connection between recent energy efficiency projects and C02 emissions. The county, located outside the Chicago metropolitan area, was awarded $2,475,900 in Energy Efficiency and Conservation Block Grant (EECBG) funds through the Recovery Act in November. Through the Recovery Act-funded

193

Non-Profit Brighter After Upgrade | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Non-Profit Brighter After Upgrade Non-Profit Brighter After Upgrade Non-Profit Brighter After Upgrade September 21, 2010 - 11:09am Addthis Loretta Prencipe Senior Communications Analyst, Office of Energy Efficiency & Renewable Energy In the Spring of 2010, the Arizona State Energy Program awarded Recovery Act funds to 14 non-profit organizations throughout the state for energy projects. One of the recipients, St. Vincent de Paul, is a human services organization that assists people in need throughout Central and Northern Arizona. The nonprofit partnered with Glendale, Arizona-based Natural Lighting Company to install skylights at the facility. In the above video, find out how this project is helping both the nonprofit and the local company. The video was created by Jim Arwood, an independent producer and former

194

County Partners with Siemens on Energy Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

County Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades July 9, 2010 - 11:11am Addthis What does this project do? Allows McHenry County to install cutting edge technology to reduce our energy costs. When you're really committed to energy efficiency and looking at $118,000 in potential energy savings annually, you want to share it. That's the view in McHenry County, Ill., which partnered with Siemens Building Technologies to launch mchenrycounty-eecbg.net to let residents understand the connection between recent energy efficiency projects and C02 emissions. The county, located outside the Chicago metropolitan area, was awarded $2,475,900 in Energy Efficiency and Conservation Block Grant (EECBG) funds through the Recovery Act in November. Through the Recovery Act-funded

195

Recommendations for improvements to program and project management  

SciTech Connect (OSTI)

Oak Ridge National Laboratory (ORNL) has operated with a balanced matrix organization for over sixteen years. Much of the work at the Laboratory is accomplished with good customer satisfaction through programs, projects, and matrix management. During the past several years concerns about program and project management at ORNL have been expressed by both the Department of Energy and ORNL staff. In May 1993 the ORNL Division/Program/Office Directors Caucus chartered a ``fox team`` to identity and to recommend improvements to matrix management that would lead to resolution of these concerns. Nine experienced ORNL staff members served on this Matrix Management Upgrade Solutions Team (MMUST). The MMUST adopted a four-phase approach in which they first gathered information and then developed and proposed recommended actions. In the fourth phase the team was available to support implementation of the recommendations. They began work in June 1993, gathering and evaluating information in biweekly meetings for six months. Recommendations developed in October and November 1993 were presented to ORNL management in December. The MMUST issued three principal recommendations based on their evaluation of the information gathered. They are: Renew and enhance the ORNL management commitment to matrix management, program managers, and project managers; Implement actions to ensure career path parity between the program/project manager family of positions and the technical line manager family of positions across all directorates and divisions; and Clarify and document program/project manager roles, responsibilities, and authorities.

Not Available

1994-01-01T23:59:59.000Z

196

Project Transition/Closeout (CD-4)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide is written for the federal project director ensuring that processes progress smoothly and that projects meet asset management goals and financial closure requirements of DOE.

2008-09-24T23:59:59.000Z

197

Principal Associate Director - Global Security  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Principal Associate Director - Global Security Principal Associate Director - Global Security As Principal Associate Director for Global Security, Wallace leads Laboratory programs with special focus on developing and applying the scientific and engineering capabilities to address complex national and global security threats. Contact Operator Los Alamos National Laboratory (505 667-5061 Wallace's expertise is forensic seismology, a highly specialized discipline focusing on detection and quantification of nuclear tests. Terry C. Wallace, Jr. Principal Associate Director for Global Security Terry C. Wallace, Jr., Principal Associate Director for Global Security As Principal Associate Director for Global Security, Wallace leads Laboratory programs with a focus on applying scientific and engineering capabilities

198

U.S. Department of Energy Acquisition Strategy Guide for Capital Assets Projects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide serves as a tool for federal project directors developing a project acquisition strategy document. No cancellation.

2008-07-22T23:59:59.000Z

199

Runner upgrading: Learning from Ontario Hydro`s experience  

SciTech Connect (OSTI)

Planning, design, and implementation of turbine runner replacement at Ontario Hydro is described in the article. The use of fully homologous modeling for upgrade projects, including both francis and propeller runner types, is outlined. Confirmation of physical model efficiency is obtained through numerical modeling. Inlet connections, setting cavitation-erosion guarantees, and other guarantees included in tender documents are also described in some detail.

Kee, D.C.; Markovich, M.S.; Munro, R.I. [Ontario Hydro (Canada)

1997-02-01T23:59:59.000Z

200

Los Alamos National Laboratory names Jeffrey Mousseau Associate Director of  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Associate Director Of Environmental Programs Associate Director Of Environmental Programs Los Alamos National Laboratory names Jeffrey Mousseau Associate Director of Environmental Programs Mousseau currently works for the Lab's transuranic waste disposal program. September 18, 2012 Jeffrey Mousseau has been hired as the new associate director for Environmental Programs. Jeffrey Mousseau has been hired as the new associate director for Environmental Programs. Contact Communications Office (505) 667-7000 "Jeff shares my personal commitment to sustaining the current momentum of waste removal and cleanup that the Lab has steadily built over the past five years." Will Oversee Transuranic Waste Disposal and Environmental Cleanup Projects LOS ALAMOS, N.M., September 18, 2012-Los Alamos National Laboratory today

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Mound Plant Director's Final Findings and Orders, October 4, 1995  

Broader source: Energy.gov (indexed) [DOE]

Mound Plant Director's Final Findings and Orders, October 4, 1995 Page 1 of 16 Mound Plant Director's Final Findings and Orders, October 4, 1995 Page 1 of 16 EM Home | Regulatory Compliance | Environmental Compliance Agreements Mound Plant Director's Final Findings and Orders, October 4, 1995 BEFORE THE OHIO ENVIRONMENTAL PROTECTION AGENCY In the Matter Of: United States Department of Energy : Director's Final Mound Facility : Findings and Order P.O. Box 66 : Miamisburg, Ohio 45343-0066 : Respondent It is hereby agreed by and among the parties hereto as follows: Table of Contents I. Jurisdiction II. Parties Bound III. Definitions IV. Findings of Fact V. Orders VI. Limitations of Director's Approval VII. Notice VIII. Project Managers IX. Dispute Resolution X. Funding XI. Other Applicable Laws XII. Reservation of Rights XIII. Modification

202

ATA beam director experiment  

SciTech Connect (OSTI)

This report describes beam director elements for an experiment at the Advanced Test Accelerator. The elements described include a vernier magnet for beam aiming, an achromat magnet, and an isolation system for the beam interface. These components are built at small scale for concept testing. (JDH)

Lee, E.P.; Younger, F.C.; Cruz, G.E.; Nolting, E.

1986-06-23T23:59:59.000Z

203

Thomas Reddinger Director, Steam  

E-Print Network [OSTI]

Thomas Reddinger Director, Steam Operations Steven Richards Assistant Manager of Maintenance Supervisor (Distribution) Deborah Moorhead Office Coordinator III Martin Bower Steam Plant Operator Richard Redfield Steam Plant Operator SU Steam Station/Chilled Water Plant Bohdan Sawa Steam Plant Operator Robert

McConnell, Terry

204

Upgrade of the MAGIC telescopes  

E-Print Network [OSTI]

The MAGIC telescopes are two Imaging Atmospheric Cherenkov Telescopes (IACTs) located on the Canary island of La Palma. With 17m diameter mirror dishes and ultra-fast electronics, they provide an energy threshold as low as 50 GeV for observations at low zenith angles. The first MAGIC telescope was taken in operation in 2004 whereas the second one joined in 2009. In 2011 we started a major upgrade program to improve and to unify the stereoscopic system of the two similar but at that time different telescopes. Here we report on the upgrade of the readout electronics and digital trigger of the two telescopes, the upgrade of the camera of the MAGIC I telescope as well as the commissioning of the system after this major upgrade.

Mazin, Daniel; Garczarczyk, Markus; Giavitto, Gianluca; Sitarek, Julian

2014-01-01T23:59:59.000Z

205

Project Sponsor Professor Peter  

E-Print Network [OSTI]

Project Sponsor Professor Peter McGearoge Project Director Nicki Matthew Audit / Quality Mazars Architect IT ServicesProcess Owners Build Team Lead Nicki Matthew Project Manager ­ Unit4 Joe Cairney Student Lifecycle Project Board InfrastructureDBA's TBC TBC TBC Process 1 Process 2 Project Sponsor ­ Unit

Levi, Ran

206

INTEGRATED CONCEPTS FOR REUSE OF UPGRADED WASTEWATER Ė ROLE OF MEMBRANES IN WATER RECYCLING  

Science Journals Connector (OSTI)

The AQUAREC project on ďIntegrated Concepts for Reuse of Upgraded WastewaterĒ is funded by the European Commission within the 5th Framework Programme as well as in Australia by the Commonwealth Department of E...

THOMAS WINTGENS; THOMAS MELIN; DAVIDE BIXIOÖ

2006-01-01T23:59:59.000Z

207

Chris Banks Director of Library  

E-Print Network [OSTI]

Chris Banks Director of Library Services Frances Boyle Assistant Director Library Academic Services Assistant to the Library Leadership Team Susan Howard Assistant Director Library Resource and Innovation Chart 1 Library Leadership Team Ruth Newton Staff Resource Coordinator (0.6 fte) Level 3b #12;Chris

208

User and Performance Impacts from Franklin Upgrades  

SciTech Connect (OSTI)

The NERSC flagship computer Cray XT4 system"Franklin" has gone through three major upgrades: quad core upgrade, CLE 2.1 upgrade, and IO upgrade, during the past year. In this paper, we will discuss the various aspects of the user impacts such as user access, user environment, and user issues etc from these upgrades. The performance impacts on the kernel benchmarks and selected application benchmarks will also be presented.

He, Yun (Helen)

2009-05-10T23:59:59.000Z

209

TO: Procurement Directors FROM: Director Contracts and Financial Assistance Policy Division  

Broader source: Energy.gov (indexed) [DOE]

0 0 DATE: June 21, 2012 TO: Procurement Directors FROM: Director Contracts and Financial Assistance Policy Division Office of Acquisition and Project Management SUBJECT: Department of Energy (DOE) Audit Guidance for For-Profit Recipients SUMMARY: Policy Flash 2012-39 provided the final audit guidance documents for independent audit forms to use in conducting compliance audits of for-profit recipients of federal financial assistance from DOE for FY 2011 and thereafter. Attached are FAQs to answer some questions we have received about the guidance. This Flash will be available online at the following website: http://energy.gov/management/office-management/operational- management/procurement-and-acquisition/policy-flashes.

210

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Broader source: Energy.gov (indexed) [DOE]

5 5 DATE: October 12, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Class Deviation from the Federal Acquisition Regulation (FAR) to Implement Office of Management and Budget (OMB) Policy Memorandum M-12-16, Providing Prompt Payment to Small Business Subcontractors SUMMARY: The Civilian Agency Acquisition Council (CAAC) issued Civilian Agency Acquisition Letter 2012-03 to distribute a class deviation clause agencies may use to require prime contractors to pay small business subcontractors on an accelerated timetable to the maximum extent practicable. This Policy Flash forwards the approved DOE class deviation and the Civilian Agency

211

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Broader source: Energy.gov (indexed) [DOE]

4 4 DATE: December 7, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Class Deviation - Extending the Biobased Product Reporting Requirement SUMMARY: The Civilian Agency Acquisition Council (CAAC) issued Civilian Agency Acquisition Letter 2013-01 to encourage agencies to extend the reporting deadline contained in paragraph (c)(2) of the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts, from October 31, 2012 to December 31, 2012. This Policy Flash forwards the approved DOE class deviation and the Civilian Agency Acquisition Letter 2013-01.

212

TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division  

Broader source: Energy.gov (indexed) [DOE]

6 6 DATE: October 31, 2013 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Affirmative procurement of biobased products under service and construction contracts (FAR clause 52.223-2) SUMMARY: The Department's Contracting Officers are reminded of the applicability of FAR clause 52.223-2 that requires contractors to submit an annual report of their biobased purchases by October 31 in the System for Award Management (SAM) located at www.sam.gov. To increase reporting compliance, please advise your contractors of this requirement. Biobased reporting is an important element in the Administration's Blueprint for the

213

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Broader source: Energy.gov (indexed) [DOE]

9 9 DATE: May 2, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Updated Reporting Requirement Checklist including the Research Performance Progress Report (RPPR) SUMMARY: Policy Flash 2011-63 transmitted the previous versions of the Reporting Requirements Checklists and the Research Performance Progress Report (RPPR) which was an attachment to the checklist. This Flash transmits a combined checklist which replaces both of the previous checklists. The RPPR has also been incorporated into the checklist. Additional updates were necessary including: correcting web site addresses, removing references to subawards for audits of

214

TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division  

Broader source: Energy.gov (indexed) [DOE]

08 08 DATE: November 6, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Acquisition and Project Management SUBJECT: Major Disaster and Emergency Declarations for Specific States from Hurricane Sandy SUMMARY: The President signed Major Disaster Declarations for New Jersey (DR 4086), New York (DR-4085), Connecticut (DR-4087), and Rhode Island (DR-4089). Additionally, the President signed Emergency Declarations for New Hampshire (EM-3360), Virginia (EM-3359), West Virginia (EM-3358), Delaware (EM-3357), Rhode Island (EM-3355), Pennsylvania (EM-3356), District of Columbia (EM-3352), Massachusetts (EM-3350), and Maryland (EM-3349). For updates please go to: http://www.fema.gov/disasters.

215

TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division  

Broader source: Energy.gov (indexed) [DOE]

10 10 DATE: November 13, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Acquisition and Project Management SUBJECT: Hurricane Sandy Contingency Operation -- Increase in Micro-Purchase and Simplified Acquisition Thresholds for Specific States and Counties SUMMARY: The Department of Energy (DOE) Senior Procurement Executive (SPE) has increased the micro-purchase and simplified acquisition thresholds for Hurricane Sandy Contingency Operation. With reference to Policy Flash 2013-08, Major Disaster and Emergency Declarations for Specific States from Hurricane Sandy, the attachment is a copy of the SPE determination and findings to increase micro-purchase and simplified acquisition thresholds. Specifically, it increases thresholds

216

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Broader source: Energy.gov (indexed) [DOE]

4 4 DATE: October 12, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Extension of SBA-DOE 8(a) Partnership Agreement SUMMARY: The current Partnership Agreement between the Small Business Administration and the Department of Energy has been extended through October 31, 2012. This Flash will be available online at the following website: http://energy.gov/management/office-management/operational- management/procurement-and-acquisition/policy-flashes. Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy,

217

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Broader source: Energy.gov (indexed) [DOE]

13 13 DATE: January 07, 2014 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: ACQUISITION LETTER 2014-03: ALLOWABILITY OF CONTRACTOR LITIGATION DEFENSE AND SETTLEMENT COSTS SUMMARY: The subject Acquisition Letter's purpose is to provide guidance to Contracting Officers on allowability of contractor litigation defense and settlement costs in light of Secretary of the Army v. Tecom. The guidance applies to legal costs related to allegations of discrimination where the discrimination is prohibited by the terms of the contract, such as those covered by FAR 52.222-26 (Equal Opportunity), FAR 52.222-35 (Equal Opportunity for

218

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Broader source: Energy.gov (indexed) [DOE]

6 6 DATE: October 12, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Executive Order-Strengthening Protections Against Trafficking in Persons in Federal Contracts SUMMARY: On September 25, 2012, President Obama issued an Executive Order (EO) that seeks to strengthen protections against human trafficking in federal contracting. Currently, the Federal Acquisition Regulation (FAR) provisions explicitly addressing human trafficking are FAR 22.1705, and its associated contract clause, FAR 52.222-50, Combating Trafficking in Persons. The President's EO builds on these existing FAR provisions and provides further contractor and agency contract administration

219

Earth System Modeling -- Director`s initiative. LDRD Program final report  

SciTech Connect (OSTI)

The objective of the Earth System Modeling Director`s Initiative is to develop and test a framework for interactively coupling subsystem models that represent the physical, chemical, and biological processes which determine the state of the atmosphere, ocean, land surface and vegetation. Most studies of the potential for human perturbations of the climate system made previously have treated only limited components of the Earth system. The purpose of this project was to demonstrate the capability of coupling all relevant components in a flexible framework that will permit a wide variety of tests to be conducted to assure realistic interactions. A representation of the Earth system is shown and its important interactions.

MacCracken, M.; Penner, J. [Lawrence Livermore National Lab., CA (United States). Atmospheric Science Div.

1996-06-01T23:59:59.000Z

220

IPNS upgrade: A feasibility study  

SciTech Connect (OSTI)

Many of Argonne National Laboratory`s (ANL`s) scientific staff members were very active in R&D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R&D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL`s Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately.

NONE

1995-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Rank Project Name Directorate, Dept/Div  

E-Print Network [OSTI]

. Shanklin) $35,000 $27,690 1 28 liters of liquid mixed waste, 6 cubic feet of radioactive waste 6 RTF

222

Fernald Environmental Management Project Director's Final Findings...  

Office of Environmental Management (EM)

25, 1995, DOE andor FERMCO shall submit to Ohio EPA a report demonstrating that the tanks have been properly decontaminated. FUNDING * No specific provisions are contained...

223

Paul Glowaski: Garden Director, Homeless Garden Project  

E-Print Network [OSTI]

of peopleís lives. Paul Glowaski Pie Ranch So Iím talking toto do, nothing to do. Pie Ranch was looking for apprentices.t really want to apprentice at Pie Ranch, but I liked what

Reti, Irene H.

2010-01-01T23:59:59.000Z

224

Fernald Environmental Management Project Director's Findings...  

Office of Environmental Management (EM)

plan describing actions to minimize potential environmental impacts to Paddy's Run, a best management practices (BMP) plan for the control of industrial wastes and other wastes...

225

Forsyth County Slashes Energy Bills with Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades September 30, 2010 - 12:04pm Addthis A new energy management system in Forsyth County√ʬĬôs 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County A new energy management system in Forsyth County's 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County Maya Payne Smart Former Writer for Energy Empowers, EERE What are the key facts? Four large projects funded through Recovery Act grant Energy efficient retrofits to save county about $72,000 annually Forsyth County, Georgia has been among the nation's fastest growing counties for the past ten years. Given the growth, officials are working

226

When Energy Efficiency Upgrades and Ghost Stories Meet | Department of  

Broader source: Energy.gov (indexed) [DOE]

When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet October 31, 2011 - 5:21pm Addthis Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Tertia Speiser Project Officer, Golden Field Office What are the key facts? New heating and cooling equipment has saved the Homewood Public Library thousands of dollars a year. It hasn't done anything about the ghosts, though. I've always thought that the best ghost stories are found in books. But what happens when the building where the books are kept is also a ghost story? Such may be the case with the award-winning public library in Homewood, Alabama, a city of 23,000 just south of Birmingham.

227

Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade | Department  

Broader source: Energy.gov (indexed) [DOE]

Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade March 16, 2011 - 2:58pm Addthis April Saylor April Saylor Former Digital Outreach Strategist, Office of Public Affairs What does this project do? In three hours, enough energy is recovered from the TMC to heat 15 loads of water for L&N's largest-capacity washing machine, and enough water is recovered to fill 1-1/2 loads of that same machine. As the provider of laundry and dry cleaning services for Disneyland Resort's costumes and hospitality supply items, L&N Costume and Linen Service knows a little something about both quantity and quality. Now, with the help of the Gas Technology Institute (GTI) and the Department of Energy, this forward-looking enterprise is embracing new, clean energy

228

Energy Upgrade Program Revitalizing Oregon | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Energy Upgrade Program Revitalizing Oregon Energy Upgrade Program Revitalizing Oregon Energy Upgrade Program Revitalizing Oregon May 28, 2010 - 2:38pm Addthis Joshua DeLung What does this project do? Local businesses in 13 communities are getting energy makeovers in an effort to help business owners save hundreds of dollars each year and revitalize downtown areas. 'Main streets' in Clackamas County, Oregon, are undergoing a makeover - an energy-efficiency makeover. As part of the Clackamas County Energy Efficiency on Main Street Program, local businesses in 13 communities are getting energy makeovers in an effort to help business owners save hundreds of dollars each year and revitalize downtown areas. First to save The program needed a guinea pig to be the first to receive a free energy audit and found a willing participant in Key Carpets, a Molalla-based store

229

Forsyth County Slashes Energy Bills with Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades September 30, 2010 - 12:04pm Addthis A new energy management system in Forsyth County√ʬĬôs 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County A new energy management system in Forsyth County's 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County Maya Payne Smart Former Writer for Energy Empowers, EERE What are the key facts? Four large projects funded through Recovery Act grant Energy efficient retrofits to save county about $72,000 annually Forsyth County, Georgia has been among the nation's fastest growing counties for the past ten years. Given the growth, officials are working

230

Microsoft Word - CX_MerrittRadioStationUpgrade_2013.docx  

Broader source: Energy.gov (indexed) [DOE]

8, 2013 8, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Merritt Radio Station Upgrade Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Microwave, meteorological, and radio towers Location: Winton, Chelan County, WA Township 26N, Range 16E, and Section 2 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA plans to upgrade its Merritt Radio Station in the Wenatchee River Ranger District of the Okanogan-Wenatchee National Forest (USFS). The proposed radio station upgrade would replace the existing communication building, electrical service, and propane tank with a new building and propane tank in adjacent locations on the

231

Living Comfortably: A Consumer's Guide to Home Energy Upgrades |  

Broader source: Energy.gov (indexed) [DOE]

Living Comfortably: A Consumer's Guide to Home Energy Upgrades Living Comfortably: A Consumer's Guide to Home Energy Upgrades Living Comfortably: A Consumer's Guide to Home Energy Upgrades March 7, 2013 - 3:15pm Addthis A weatherization worker drills holes to blow cellulose insulation in the interior walls of this home. | Photo courtesy of Dennis Schroeder, NREL A weatherization worker drills holes to blow cellulose insulation in the interior walls of this home. | Photo courtesy of Dennis Schroeder, NREL Dr. Richard Knaub Project Leader in Weatherization & Workforce Development at the National Renewable Energy Laboratory Energy audit tools An infrared camera can display temperature differences between surfaces and help determine if a wall is insulated. It can show drafts and moisture, which can lead to mold problems.

232

When Energy Efficiency Upgrades and Ghost Stories Meet | Department of  

Broader source: Energy.gov (indexed) [DOE]

When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet October 31, 2011 - 5:21pm Addthis Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Tertia Speiser Project Officer, Golden Field Office What are the key facts? New heating and cooling equipment has saved the Homewood Public Library thousands of dollars a year. It hasn't done anything about the ghosts, though. I've always thought that the best ghost stories are found in books. But what happens when the building where the books are kept is also a ghost story? Such may be the case with the award-winning public library in Homewood, Alabama, a city of 23,000 just south of Birmingham.

233

Director testifies before Senate subcommittee  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Director testifies before Senate subcommittee Director testifies before Senate subcommittee Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues ¬Ľ submit Director testifies before Senate subcommittee Future Laboratory budgets under consideration. June 1, 2013 Director Charlie McMillan during his remarks Director Charlie McMillan during his remarks Contact Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email Lab Director Charlie McMillan and the directors of Sandia and Lawrence Livermore national laboratories recently spoke before the U.S. Senate Subcommittee on Strategic Forces, Committee on Armed Services. The purpose of the hearing was to to receive testimony on NNSA management of its national security laboratories and to review the budget request for Fiscal

234

Substation voltage upgrading  

SciTech Connect (OSTI)

Substation voltage uprating, i.e., conversion of a substation from a lower rated voltage to a higher rated voltage without a complete substation rebuild, can lead to excellent economic benefits. Utilization of the old substation layout and/or the existing equipment, to some extent, is the practical objective of such an uprating. The objective of this project was to assess the opportunities for substation uprating in the industry, to establish feasibility for such uprating and to study methods for accomplishing it. The final aim of the project was to provide guidance to utilities interested in uprating. 56 refs., 41 figs., 18 tabs.

Panek, J.; Elahi, H.; Sublich, M. (General Electric Co., Schenectady, NY (USA). Systems Development and Engineering Dept.)

1989-08-01T23:59:59.000Z

235

Department of Energy Guide for Project Execution Plans  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This directive provides guidance for the federal project director to produce a useful and flexible plan. No cancellation.

2008-09-12T23:59:59.000Z

236

LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES | Department...  

Energy Savers [EERE]

LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES Faced with the challenge of...

237

Posted CX Q14 Sprinkler System Upgrade.pdf  

Broader source: Energy.gov (indexed) [DOE]

(NEPA) Categorical Exclusion (eX) (NEPA) Categorical Exclusion (eX) Determination Summary Form Q14 Sprinkler System Upgrade Project REFERENCE J 10 CFR Part 1021 , Department of Energy National Environmental Policy Act Implementation Procedures, Subpart 0 , Typical Classes of Actions PROJECT SCOPE DISCUSSION The project scope will upgrade the Q14 sprinkler system to meet exposed plastic design basis requirements by installing a fire pump and performing modifications to the Q14 sprinkler piping. The fire pump will be a pre-assembled skid system with enclosure diesel powered pump and associated diesel storage tank. The fire pump assembly wi ll be located on a foundation pad in the grassy area ,;!orthwest of 014. Electrical work will include providing general power to the fire pump building and fire pump control/alarm wiring to a fire alarm panel in the 014

238

upgrade | OpenEI Community  

Open Energy Info (EERE)

4 4 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235354 Varnish cache server upgrade Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 22 October, 2012 - 07:23 Semantic Mediawiki Semantic Forms update developer Incentives and Policies Semantic Mediawiki upgrade Utility Rates We have just updated Semantic Forms on OpenEI to version 2.4 to enable some upgrades to the utility rate forms (thanks Teresa!). If you see any problems in forms you use on OpenEI, please notify us by commenting on this

239

Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption  

SciTech Connect (OSTI)

The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the technical feasibility and cost of upgrading low-BTU methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys modular microchannel process technology. The objective of Phase II is to demonstrate the process at the bench-scale. Natural gas upgrading systems have six main unit operations: feed compressor, dehydration unit, nitrogen rejection unit, deoxygenator, carbon dioxide scrubber, and a sales compressor. The NRU is the focus of the development program, and a bench-scale demonstration has been initiated. The Velocys NRU system targets producing methane with greater than 96% purity and at least 90% recovery for final commercial operation. A preliminary cost analysis of the methane upgrading system, including the Velocys NRU, suggests that costs below $2.00 per million (MM) BTU methane may be achieved. The cost for a conventional methane upgrading system is well above $2.30 per MM BTU, as benchmarked in an Environmental Protection Agency study. The project is on schedule and on budget. Task 4, a bench-scale demonstration of the ultra-fast TSA system is complete. Rapid thermal swing of an adsorbent bed using microchannels has been successfully demonstrated and the separation of a 70% methane and 30% nitrogen was purified to 92% methane. The bench-scale demonstration unit was small relative to the system dead volume for the initial phase of experiments and a purge step was added to sweep the dead volume prior to desorbing the bed and measuring purity. A technical and economic feasibility assessment was completed in Task 3. The proposed Velocys technology appears feasible for the methane upgrading market. Evaluated categories include adsorbent selection, rapid-cycle valve selection, microchannel manufacturability assessment, and system design and cost. The selected adsorbent, granular microporous carbon from either Barnaby-Sutcliffe or Calgon, experimentally demonstrated sufficient methane capacity under differential temperature at 100 pounds per square inch gauge. Several valve options were identified, including candidates that can operate millions of cycles between refurbishment. The microchannel adsorber and desorber designs were made using internal Velocys manufacturability standards, and the associated costs are acceptable as included with the complete nitrogen rejection unit (NRU) cost projection. A system design and cost estimate was completed for the NRU section of the methane upgrading system. As integrated into the complete system, the cost is in line with the market requirement.

Anna Lee Tonkovich

2005-07-01T23:59:59.000Z

240

Program Finds Unique Way to Fund Energy Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Finds Unique Way to Fund Energy Upgrades Program Finds Unique Way to Fund Energy Upgrades Program Finds Unique Way to Fund Energy Upgrades May 4, 2010 - 11:11am Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE The $40 million of Recovery Acts funds used for weatherizing more than 6,500 homes over the next two years in Arkansas is a welcomed boost, but Martha Jane Murray of the Clinton Foundation is thinking bigger. "How do we create a more robust delivery system that is not just relying on federal dollars," asks Martha Jane, the program director for the foundation's Arkansas Clinton Climate Initiative (CCI AR). For CCI AR, one answer is the Home Energy Affordability Loan, or HEAL, program. In a unique approach to help chip away at the list of homes in need of weatherization and lower industrial energy consumption, CCI AR developed a

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Kansas Advanced Semiconductor Project  

SciTech Connect (OSTI)

KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

2007-09-21T23:59:59.000Z

242

Upgraded recovery boiler meets low air emissions standards  

SciTech Connect (OSTI)

In the fall of 1990, the Boise Cascade mill in International Falls, MN, carried out a millwide modernization project. One critical element of the project was the upgrade of their recovery boiler. As a result of the recovery boiler upgrade, the mill was required to obtain a prevention of significant deterioration (PSD) air permit. A best available control technology (BACT) assessment was performed as a requirement of the PSD regulations. Ultimately, a number of more stringent air pollution emission limits were established for the boiler, and a continuous emissions monitoring system (CEMS) was purchased and installed to report daily results to the Minnesota Pollution Control Agency. This paper describes efforts to achieve increased firing capacity in the mill's recovery boiler while meeting more severe air emissions regulations. The authors will show that each of the emissions limits, including CO, SO[sub 2], NO[sub x], TRS, and opacity, are met by the upgraded boiler, while achieving an increase in firing capacity over pre-upgrade levels of up to 40%.

La Fond, J.F.; Jansen, J.H. (Jansen Combustion and Boiler Technologies, Inc., Woodinville, WA (United States)); Eide, P. (Boise Cascade Corp., International Falls, MN (United States))

1994-12-01T23:59:59.000Z

243

CEBAF Upgrade: Cryomodule Performance And Lessons Learned  

SciTech Connect (OSTI)

The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

Drury, Michael A.; Davis, G. Kirk; Hogan, John P.; Hovater, J. Curt; King, Lawrence; Marhauser, Frank; Park, HyeKyoung; Preble, Joe; Reece, Charles E.; Rimmer, Robert A.; Wang, Haipeng; Wiseman, Mark A.

2014-02-01T23:59:59.000Z

244

Light Sources Directorate Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Light Sources Directorate Light Sources Directorate Strategic Plan December 2009 Light Sources Directorate Strategic Plan December 2009 ii | Vision and Mission Light Sources Directorate Strategic Plan The VISION of the Light Sources Directorate is: to be a provider of choice for world-class photon science and facilities that deliver outstanding scientific productivity and impact, and to be recognized as a leader in developing innovative techniques and ap- plications of photon science Our MISSION is defined by the set of activities that are required to realize this vision: to advance scientific knowledge and to solve critical problems through the design, construction, operation, and use of premier photon science facilities | Table of Contents Light Sources Directorate Strategic Plan

245

High temperature ceramic membrane reactors for coal liquid upgrading  

SciTech Connect (OSTI)

In this project we will study a novel process concept, i.e., the use of ceramic membrane reactors in upgrading of coal model compounds and coal derived liquids. In general terms, the USC research team is responsible for constructing and operating the membrane reactor apparatus and for testing various inorganic membranes for the upgrading of coal derived asphaltenes and coal model compounds. The USC effort will involve the principal investigator of this project and two graduate research assistants. The ALCOA team is responsible for the preparation of the inorganic membranes, for construction and testing of the ceramic membrane modules, and for measurement of their transport properties. The ALCOA research effort will involve Dr. Paul K. T. Liu, who is the project manager of the ALCOA research team, an engineer and a technician. UNOCAL's contribution will be limited to overall technical assistance in catalyst preparation and the operation of the laboratory upgrading membrane reactor and for analytical back-up and expertise in oil analysis and materials characterization. UNOCAL is a no-cost contractor but will be involved in all aspects of the project, as deemed appropriate.

Tsotsis, T.T.

1992-01-01T23:59:59.000Z

246

CATEGORICAL EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES,  

Broader source: Energy.gov (indexed) [DOE]

EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES, EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES, 300 AREA, HANFORD SITE, RICHLAND, WASHINGTON Proposed Action: The U.S. Department of Energy (DOE), Pacific Northwest Site Office (PNSO) proposes to upgrade a landscaping irrigation system in the 300 Area. Location of Action: In the landscaped area around the 331 Building, Hanford Site Description of the Proposed Action: The proposed action is to upgrade the existing 331 Building landscaping irrigation system by using nearby aquaculture effluent instead of

247

LHC challenges and upgrade options  

Science Journals Connector (OSTI)

The presentation summarizes the key parameters of the LHC collider. Following a discussion of the main challenges for reaching the nominal machine performance the presentation identifies options for increasing the operation tolerances and the potential performance reach of the LHC by means of future hardware upgrades of the LHC and its injector complex.

O Bruning

2008-01-01T23:59:59.000Z

248

ATLAS Upgrade for sLHC Motivation  

E-Print Network [OSTI]

ATLAS Upgrade for sLHC · Motivation · LHC Upgrades · ATLAS Upgrade/schedule · R&D Variety · Russian Institutes involvement · Conclusions A.Cheplakov JINR, Dubna (on behalf of the ATLAS Collaboration) Many thanks to ATLAS colleagues for the useful information - N.Hessey, A.Loginov, A.Romaniouk, P

249

ATLAS Upgrade Week 1 November 11, 2009  

E-Print Network [OSTI]

ATLAS Upgrade Week 1 November 11, 2009 Proposal to Develop On-Detector Array-based Optical Link A. Maettig Universität Wuppertal K.K. Gan A. Pellegrino, T. Sluijk NIKHEF (LHCb) #12;ATLAS Upgrade Week 2;ATLAS Upgrade Week 3 Introduction VCSEL and PIN are available in three forms: single channel or 4

Gan, K. K.

250

Microsoft Word - Lower-MidColumbia-Upgrade-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

3, 2010 3, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Steve Prickett Project Manager - TEP Proposed Action: Lower Mid-Columbia / Midway-Vantage 230-kV Transmission Line Upgrade Project Budget Information: Work Order #238901 and #231311, Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility..." B4.7 Adding fiber optic cable to transmission structures or burying fiber optic cable in existing transmission line rights-of-way. B4.13 "Reconstruction (upgrading or rebuilding) and/or minor relocation of existing electric powerlines

251

Microsoft Word - CX_MetalineRadioStationUpgrade_2012.docx  

Broader source: Energy.gov (indexed) [DOE]

July 11, 2012 July 11, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Metaline Radio Station Upgrade Project Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19- Siting/construction/operation of microwave/radio communication towers Location: Metaline Falls, Pend Orielle County, WA Township 40N, Range 43E, Section 31 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade its Metaline Radio Station in the Sullivan Lake Ranger District of the Colville National Forest. BPA is coordinating with the US Forest Service (USFS) to ensure the existing land use agreement is modified to adequately address

252

Microsoft Word - CX-BettasRd-ColumbiaThermalUpgradeFY12_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

25, 2012 25, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: Bettas Road-Columbia No. 1 230-kV transmission line thermal upgrade Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B4.13, Upgrading and rebuilding existing powerlines Location: Kittitas and Chelan counties, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The project, as proposed, is to upgrade the existing Bettas Road-Columbia No. 1 230-kV transmission line to a maximum operating temperature of 100 ¬įC. Five small segments (equal to approximately 3 miles) along the transmission line will be upgraded in order to meet this overall objective. Construction includes the relocation and

253

Outdoor Recreation welcomes new director  

E-Print Network [OSTI]

Outdoor Recreation welcomes new director Outdoor Recreation welcomed the program's new director Liz, Outdoor Recreation hosted its 5th annual Carolina Crush Climbing Competition at the Strom Thurmond with the Make-A-Wish Foundation, Outdoor Recreation collaborated with the Make-A- Wish Club at USC to fundraise

Almor, Amit

254

Director's Office Building 510F  

E-Print Network [OSTI]

Director's Office Building 510F P.O. Box 11973-5000 Phone 631 344-5414 Fax 631 344-5820 tkirk to your Proposal, P965, "Proposal to Measure the Efficiency of Electron Charge Sign Determination up to 10 regards, Thomas B.W. Kirk Associate Laboratory Director High Energy and Nuclear Physics Cc: PAC Members D

McDonald, Kirk

255

Viewgraph from the Director  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 2 Viewgraph from the Director Art Rosenfeld standing in front of a black board. Few benefits are provided by electric power plants, coal mines, oil pipelines, and other energy supply systems aside from the energy they produce. Technologies to improve energy end-use efficiency, however, offer numerous non-energy benefits. One class of such benefits accrues at the national level-improved competitiveness, energy security, net job creation, environmental protection-while another relates to consumer decision-making. From a consumer perspective, it is often the non-energy benefits that motivate (or can be used to promote) decisions to adopt energy-efficient technologies. A striking example is the rapid penetration of microwave ovens into the housing stock. While energy savings from microwave ovens can

256

W. E. Mott, Director,  

Office of Legacy Management (LM)

Department of Energy Department of Energy F&k i?z;;Operations dak Ridge, Tennessee 37830 W. E. Mott, Director, It is concluded that the potential for uranium contamination, even during the contract period, was small and that subsequent disposition of laboratory, furnishings and equipment further reduced that potential to the point where, it is felt, the need for further onsite investigation is not indicated. Hence, it is recommended that the reassessment of the site at 818 Perry Street, Richmond, Virginia, be terminated with this report. ti?LbL~ W. T. Thornton Environmental Protection Branch 0SE:WTT Safety & Environmental Control Division c d v76-2 Bo 7W -rwG 1 - ---_ -- -- Er-fl ,T - .,- L 4-------c 1 / 7, pi ' I ./7 * ---:;N-... __ P 2 (' - , . . dq/ ' j'

257

TO: FROM: Procurement Directors  

Broader source: Energy.gov (indexed) [DOE]

POLICY FLASH 2010-28 POLICY FLASH 2010-28 '/ 7- DATE: March 4,20 10 TO: FROM: Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Temporary Waiver of Mandatory Use of the Strategic Integrated Procurement Enterprise System (STRIPES) for Certain Purchase Card Transactions SUMMARY: Several issues have been identified relating to the use of STRIPES for the processing of transactions at or below the micro-purchase threshold of $3,000 using the Government-wide purchase card. These issues relate strictly to the efficient processing of such transactions and not to the ability of STRIPES to properly and accurately process these actions. Based on the above, the mandatory use of STRIPES for individual purchase card transactions

258

TO: FROM: Procurement Directors  

Broader source: Energy.gov (indexed) [DOE]

b b POLICY FLASH 2010-42 . DATE: April 8,20 10 TO: FROM: Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Use of New Strategically Sourced Blanket Purchase Agreement for Domestic Delivery Services with United Parcel Service SUMMARY: The Department of Energy (DOE) is participating as an authorized user of the second generation General Services Administration (GSA) Blanket Purchase Agreement (BPA) GS-33F-BQV08 for Express and Ground Domestic Delivery Services (DDS2) in the continental United States, Alaska, Hawaii, and Puerto Rico. DDS2 is a full service Federal Strategic Sourcing Initiative (FSSI) solution providing agencies with a range of delivery options as well as

259

Procurement Directors DATE: TO:  

Broader source: Energy.gov (indexed) [DOE]

18 18 1 POLICY FLASH 2008-1 8 January 29,2008 Procurement Directors DATE: TO: FROM: Office of Procurement and Assistance Policy, MA-6 1 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2008-18 SUMMARY: The General Services Administration has issued Federal Acquisition Circular 2005-23. This Circular can be found at page 732 14 of the December 26,2007 Federal Register. The Circular covers three subjects for which interim or final rules have been issued amending the Federal Acquisition Regulation. A description of each revision is contained in the attachment. None of these necessitates a revision of the DEAR. One of the revisions dealing with the Electronic Product Environmental Assessment Tool (EPEAT) replaces

260

UPGRADING METHANE USING ULTRA-FAST THERMAL SWING ADSORPTION  

SciTech Connect (OSTI)

The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the feasibility of upgrading low-Btu methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys' modular microchannel process technology. The project is on schedule and under budget. For Task 1.1, the open literature, patent information, and vendor contacts were surveyed to identify adsorbent candidates for experimental validation and subsequent demonstration in an MPT-based ultra-fast TSA separation for methane upgrading. The leading candidates for preferential adsorption of methane over nitrogen are highly microporous carbons. A Molecular Gate{trademark} zeolite from Engelhard Corporation has emerged as a candidate. For Task 1.2, experimental evaluation of adsorbents was initiated, and data were collected on carbon (MGN-101) from PICA, Inc. This carbon demonstrated a preferential capacity for methane over nitrogen, as well as a reasonable thermal swing differential capacity for a 90% methane and 10% nitrogen mixture. A similar methane swing capacity at 2 psig was measured. The mixture composition is relevant because gob gas contains nearly 85% methane and must be purified to 97% methane for pipeline quality.

Anna Lee Tonkovich

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

262

Substation voltage upgrading  

SciTech Connect (OSTI)

This report addresses specific issues to support sound yet not unduly conservative uprating practices for substations. The main parts of the report cover the insulation withstand and overvoltage protection aspects, environmental measurements, reliability criteria, and industry experience. First the insulation design concerns are addressed. Substation stress by a backflashover of the line insulation due to lightning in the vicinity of the substation is recognized as a critical stress. A representative part of a 550 kV BIL substation was erected at the EPRI High Voltage Transmission Research Center, where also a special test circuit was assembled to produce a fast front, slow tail (0.2/200 {mu}s) wave. The substation as well as some special configurations were tested for line-to-ground and line-to-line withstand. Computer studies were performed to complement the test results. A number of important conclusions was reached. The most prominent result in that the high frequency oscillations, as caused by reflections within the substation, do not effect the Critical Flashover Voltage (CFO). The present practice, based on the highest peak is therefore very conservative. The slow tail of the wave appears to dictate the CFO. An arrester model for computer studies to represent very fast as well as slow phenomena was derived. It is based on full scale arrester test data, made available in this project. The computer program to calculate arrester model parameters is also a part of the report. The electric environmental measurements are reported for the tested substation at the HVTRC and for the uprated substation of Public Service Company of Colorado, both before and after the uprating. The performance is satisfactory when corona free hardware is used. Insulation design criteria are analyzed based on substation reliability, the system viewpoint and consequences of the failure. Utility experience with uprated substations is reviewed.

Panek, J.; Elahi, H.; Lux, A.; Imece, A.F. (General Electric Co., Schenectady, NY (United States). Power Systems Engineering Dept.); LaPanse, R.A.; Stewart, J.R. (Public Service Co. of Colorado, Denver, CO (United States))

1992-04-01T23:59:59.000Z

263

PROJECT DESCRIPTION PROJECT TIMELINE PROJECT COSTS FUNDING SOURCE 1 Akers Hall, originally constructed in 1964, requires major  

E-Print Network [OSTI]

PROJECT DESCRIPTION PROJECT TIMELINE PROJECT COSTS FUNDING SOURCE 1 Akers Hall TIMELINE PROJECT COSTS FUNDING SOURCE 2 Olin Health Center is a 105,000 squarefoot medical center DESCRIPTION PROJECT TIMELINE PROJECT COSTS FUNDING SOURCE 3 Munn Ice Arena HVAC Upgrades and Ice

264

Recent Upgrade of the Klystron Modulator at SLAC  

SciTech Connect (OSTI)

The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 {mu}S at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 {mu}S at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

Nguyen, M.N.; Burkhart, C.P.; Lam, B.K.; Morris, B.; /SLAC

2011-11-04T23:59:59.000Z

265

Innovative Technology Improves Upgrading Process for Unconventional Oil  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

09, 2013 09, 2013 Innovative Technology Improves Upgrading Process for Unconventional Oil Resources Washington, D.C. - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology. Heavy oil is crude oil that is viscous and requires thermally enhanced oil recovery methods, such as steam and hot water injection, to reduce its viscosity and enable it to flow. The largest U.S. deposits of heavy oil are in California and on Alaska's North Slope. Estimates for the U.S. heavy oil resource total about 104 billion barrels of oil in place - nearly five times the United States' proved reserves. In addition, although no commercial-scale development of U.S. oil sands or oil shale has yet occurred, both represent another potential future domestic unconventional oil resource.

266

Los Alamos National Laboratory names Jeffrey Mousseau Associate Director of  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

names names Jeffrey Mousseau Associate Director of Environmental Programs September 18, 2012 Will Oversee Transuranic Waste Disposal and Environmental Cleanup Projects LOS ALAMOS, N.M., September 18, 2012-Los Alamos National Laboratory today announced that Jeffrey Mousseau has been hired as the new associate director for Environmental Programs. Mousseau currently works as a senior project manager for the Laboratory's transuranic waste disposal program. In his new position, he will oversee this program as well as other key environmental cleanup and monitoring activities. - 2 - "Jeff shares my personal commitment to sustaining the current momentum of waste removal and cleanup that the Lab has steadily built over the past five years," said Laboratory Director Charlie McMillan. "His expertise in this area is outstanding, and will

267

Mr. Walter Huber, Director Capital Improvements Division National Capital Region  

Office of Legacy Management (LM)

Walter Huber, Director Walter Huber, Director Capital Improvements Division National Capital Region 7th & D Streets, N.W. Washington, D.C. 20407 Dear Mr. Huber: As you may know, the Department of Energy (DOE) is evaluating the radiological condition of sites that were utilized under the Manhattan Engineer District (MED) and the Atomic Energy Commission (AEC) during the early years of nuclear development to determine whether they need remedial action and whether the Department has authority to perform such action. General Services Administration (GSA) was contacted through correspondence with Mr. John P. Allen, Project Director, Special Projects Division of GSA, that the former National Bureau of Standards (NBS) building on Van Ness Street was identified as one such site. This building was used by NBS

268

ARPA-E Director Arun Majumdar to Host Conference Call to Announce New  

Broader source: Energy.gov (indexed) [DOE]

Director Arun Majumdar to Host Conference Call to Announce Director Arun Majumdar to Host Conference Call to Announce New ARPA-E Projects ARPA-E Director Arun Majumdar to Host Conference Call to Announce New ARPA-E Projects September 28, 2011 - 3:28pm Addthis Washington, D.C. - Tomorrow, Thursday, September 29, Arun Majumdar, Director of the Advanced Research Projects Agency - Energy (ARPA-E) at the Department of Energy, will host a conference call to announce newly selected cutting-edge research projects aimed at dramatically improving how the U.S. uses and produces energy. This fourth round of ARPA-E project selections focuses on transformational, breakthrough technologies in rare earth alternatives, biofuels, thermal storage, electronic grid controls, and solar power electronics. Demonstrating the success ARPA-E has already

269

SoMAS alumni have gone on to careers as: Acting Director, NY Sea Grant  

E-Print Network [OSTI]

· Environmental Affairs Officer on Marine & Coastal Biodiversity, UNEP Secretariat of Convention on Biological & Facilities Specialist, NY Sea Grant Extension · Director, Center for Marine & Wetland Studies, Conway, SC, Dewberry, Fairfax, VA · Marine Conservation Project Director, The Nature Conservancy · Marine Ecologist

Zhang, Minghua

270

UCPath Project Status Report Report Date August 23, 2013  

E-Print Network [OSTI]

unfilled critical positions. Development of UCPath Center operating procedures. UCPath project health check1 UCPath Project Status Report Report Date August 23, 2013 Project Director Anthony Lo Anthony.Lo@ucop.edu Executive Sponsors Nathan Brostrom Peter Taylor Project Summary Tony Lo has resigned as Project Director

Russell, Lynn

271

About: Why Energy Efficiency Upgrades  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Why Energy Efficiency Upgrades Why Energy Efficiency Upgrades Two photos side by side showing energy loss through the use of infrared technology. As part of a home energy evaluation, an energy professional can use an infrared camera to pinpoint where air leaks and drafts are occurring in your home or building. Although normally difficult to see, these infrared photos clearly show in color where energy losses are occurring in a typical house. How We Use Energy in Our Buildings How We Use Energy in Our Homes (% of Energy Consumption) A pie chart illustrating the following breakdown: Space heating 43%, space cooling 9.7%, water heating 17.1%, lighting 6.2%, refrigeration 3.9%, electronics 3%, wet cleaning 3.2%, cooking 3.1%, computers 1.6%. Source: 2010 Buildings Energy Data Book, Table 2.1.6

272

Director's Discretionary Research and Development Program, Annual...  

Office of Environmental Management (EM)

Director's Discretionary Research and Development Program, Annual Report FY 2007 Director's Discretionary Research and Development Program, Annual Report FY 2007 Draft...

273

Geothermal Technologies Office Director Doug Hollett Keynotes...  

Broader source: Energy.gov (indexed) [DOE]

Technologies Office Director Doug Hollett Keynotes at National Geothermal Summit, August 6 Geothermal Technologies Office Director Doug Hollett Keynotes at National Geothermal...

274

Sandia National Laboratories: Science and Technology Directorate  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Science and Technology Directorate EC, DHS's S&T Directorate, Federal Emergency Management Agency: SUMMIT On March 21, 2013, in Analysis, Capabilities, Facilities, Global,...

275

2014 DOE Project Management Workshop Presentations | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

1. PM Update - Paul Bosco, Director, Office of Acquisition & Project Management 2. Ethics - Marianne Jennings, W.P. Carey School of Business at Arizona State University 3....

276

Emerging Markets for Wood Energy Richard Vlosky, Director  

E-Print Network [OSTI]

2/20/2014 1 Emerging Markets for Wood Energy Richard Vlosky, Director Crosby Land & Resources change the landscape. Overview of Emerging Biomass-to-Energy Markets Projections show U.S. energy;2/20/2014 9 Overview of Emerging Biomass-to-Energy Markets Government support of market development include

277

Plant Operations Executive Director  

E-Print Network [OSTI]

Campus North Campus Recycling Operations Materials Human Resources Payroll Misc Svs Special Projects Planning Spray Shop Glass Shop Upholstery Shop Plant IT Painting Services G. Weincouff Human Resources Business Services Estimating Shutdown Coordination Scheduling L. Rastique Human Resources 67398 M

Awtar, Shorya

278

Fermilab | Directorate | Program Planning Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program Planning Office Program Planning Office Steve Geer, Head The Program Planning Office within the Fermilab Directorate coordinates the experimental physics program carried out at the Laboratory. The office provides a link between ongoing and planned experiments and the Directorate, by: Acting as liaison between experimenters and laboratory staff regarding beam conditions during accelerator operation. Establishing priorities between accelerator studies and experiments and among experiments, in consultation with the Director, and resolving conflicting requests from experiments. Coordinating Division and Section reviews of draft Memoranda of Understanding for approved experiments. Coordinating updates to the "Procedures for Researchers" which provides a guide for researchers using Fermilab facilities.

279

Moab Uranium Mill Tailings Cleanup Project Steps into Spotlight at  

Broader source: Energy.gov (indexed) [DOE]

Uranium Mill Tailings Cleanup Project Steps into Spotlight at Uranium Mill Tailings Cleanup Project Steps into Spotlight at International Meeting in Vienna Moab Uranium Mill Tailings Cleanup Project Steps into Spotlight at International Meeting in Vienna October 22, 2012 - 12:00pm Addthis Moab Federal Project Director Donald Metzler presents at the Uranium Mining Remediation Exchange Group meeting in Germany in September 2011. Moab Federal Project Director Donald Metzler presents at the Uranium Mining Remediation Exchange Group meeting in Germany in September 2011. Moab Federal Project Director Donald Metzler Moab Federal Project Director Donald Metzler Moab Federal Project Director Donald Metzler presents at the Uranium Mining Remediation Exchange Group meeting in Germany in September 2011. Moab Federal Project Director Donald Metzler

280

D0 Silicon Upgrade: Upgrade on Cryogenic Lines at Refrigerator  

SciTech Connect (OSTI)

This is an upgrade to the thermal contraction analysis sound in D0 Engineering Note: 3823.115-EN-426. In this new design, a portion of the transfer lines are consolidated into one 6-inch vacuum jacket. Since all four transfer lines follow the same path and are of equal lengths, the stress analysis is performed on only one transfer line using the design system ALGOR{reg_sign}. The GHe Cooldown Supply line is analyzed for combined pressure, thermal movement, and dead weight and all the stresses were below the allowable stress limit of 25,050 psi.

Kuwazaki, Andrew; /Fermilab

1995-09-26T23:59:59.000Z

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Broader source: Energy.gov (indexed) [DOE]

36 36 DATE: March 7 , 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Update to Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 SUMMARY: Since we previously notified you in Policy Flash 2012-44 for Congressional notifications, there are changes to the process. On March 15, 2013, the automated system will be implemented via a phased approach. As your office transitions to the automated system, reporting for awards and modifications shall be through the automated system. For offices which will not begin using the automated system until later, these offices shall continue to do manual reporting

282

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Broader source: Energy.gov (indexed) [DOE]

POLICY FLASH 2013-46 POLICY FLASH 2013-46 DATE: April 18, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Awardee Share in STRIPES SUMMARY: A problem has been identified with completing the awardee share fields on the FAADS/FAADS Plus reporting screen in STRIPES. Data quality is an area of major focus especially for the data being sent to USASpending.gov as required by the Federal Funding and Transparency Act. The attached Awardee Share Procedures detail the procedures for correctly reporting the awardee share (also known as the cost share, recipient share, and non-federal share) on the FAADS/FAADS Plus screen in STRIPES.

283

TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division  

Broader source: Energy.gov (indexed) [DOE]

POLICY FLASH 2013-58 POLICY FLASH 2013-58 DATE: June 5, 2013 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Revised Guide for Financial Assistance SUMMARY: Attached is a revised Guide for Financial Assistance. The Guide has been updated to reflect changes to web sites, organization names, systems, and DOE policies and practices since the guide was last issued. The revision date has been inserted in the section heading for all sections that had substantive changes (not just web site or organization name changes). This flash and its attachments may be viewed at http://management.energy.gov/policy_guidance/policy_flashes.htm.

284

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Broader source: Energy.gov (indexed) [DOE]

4-10 4-10 DATE: November 26 , 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Update to Congressional Notifications - Full Implementation of Advanced Notification of Awards (ANA) System SUMMARY: Policy Flash 2013-36 transmitted Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6 describing the revised ANA process. There are no changes to these two chapters. As described in the earlier Policy Flash, the system was being implemented in a Phased approach. On October 25, 2013, the second and final phase of the ANA system was implemented. The system is now mandatory for all DOE organizations as

285

Director's commitment to diversity recognized  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Director's commitment to diversity recognized Director's commitment to diversity recognized Director's commitment to diversity recognized Profiles in Diversity Journal is recognizing Director Michael Anastasio for his commitment to workplace diversity. March 11, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Contact Communications Office

286

Board of Directors Executive Committee  

E-Print Network [OSTI]

, Los Angeles, CA Julie Gage Palmer AB '84, Deerfield, IL Argelia M. Rodriguez MBA '84, Bethesda, MD James A. Star AB '83, Chicago, IL Directors for the Graduate Schools and Alumni Organizations

287

ORISE: Message from the Director  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Message from the Director The Oak Ridge Institute for Science and Education (ORISE) supports the U.S. Department of Energy (DOE) and other federal agencies in strengthening the...

288

Energy Upgrade California | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Upgrade California Upgrade California Energy Upgrade California < Back Eligibility Multi-Family Residential Residential Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Other Sealing Your Home Ventilation Manufacturing Heating Windows, Doors, & Skylights Program Info Funding Source The American Reinvestment and Recovery Act of 2009, ratepayer funds State California Program Type State Rebate Program Rebate Amount Basic Upgrade Package: 1,000 Advance Upgrade Package: 1,500 - 4,000 The Energy Upgrade California program serves as a one-stop shop for California homeowners who want to improve the energy efficiency of their homes. The program connects homeowners with qualified contractors, and helps homeowners find all the available incentives from their local

289

Guidelines for Home Energy Professionals Project: Benefits for...  

Energy Savers [EERE]

for Home Energy Professionals project fosters the growth of a high-quality residential energy upgrade market and a skilled, credentialed workforce. As a result, home energy...

290

Support of US CLIVAR Project Office 2012  

SciTech Connect (OSTI)

SUBJECT: CLOSEOUT OF AWARD NO DE-SC0008494 FINAL REPORT: SUPPORT OF US CLIVAR PROJECT OFFICE 2012 UNIVERSITY CORPORATION FOR ATMOSPHERIC RESEARCH Director of JOSS, supervised the U.S. CLIVAR Project Office Director and helped direct the officer to enhance the goals and objectives of the U.S. CLIVAR Project and budget. Financial Manager of JOSS, worked to complete proposals and monitor compliance with award requirements and funding limitations and ensure the U.S. CLIVAR Project Office complied with UCAR policies and procedures. Project Coordinator administered the funding for the U.S. CLIVAR Project Office and was responsible for coordinating special projects that required additional support from JOSS technical staff. These projects included activities such as website updates, technology upgrades, production of printed reports, and development of graphic elements like logos. Web Developer worked both on web development and graphic work and the work consisted of the following: Maintaining the site ? installing updates to Drupal CMS (Content Management System). Creating new templates for webpages and styling them with CSS and JavaScript/jQuery code. Fixing the styling on webpages that the content contributor/manager (Jenn Mays) created and has had trouble with. Creating new web forms for abstract uploading, subscriptions, and meeting registrations. Created 4 webpages for the ?ASP: Key Uncertainties in the Global Carbon-Cycle? meeting. Developed a document review form, instruction webpages, login redirect, dynamic table with form submissions for the US CLIVAR SSC Science Plan Document Review. This was open to the public from June 12, 2013 until July 10, 2013. During this time the user accounts had to be checked (daily) that were created by the public, to delete any spam ones. Graphics work: preparing images for general use on webpages, webpage banners, and for meeting name badges, creating a US CLIVAR letterhead, redesigning the US AMOC logo. System Administrator spent time working on the migration of the US CLIVAR site from the USGCRP office to UCAR here Boulder. This was done to increase the general speed of the site & to allow the web developer to work in it more efficiently. Main tasks were to Archive the old Site, create new development site for web developer, and move web address to new website when web developer was finished with development. There are no patients or equipment related to this proposals

Cummings, Donna

2013-11-21T23:59:59.000Z

291

Department of Energy Names Director for Office of Indian Energy Policy and  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Names Director for Office of Indian Energy Department of Energy Names Director for Office of Indian Energy Policy and Makes Available $2 Million for Clean Energy Projects on Tribal Lands Department of Energy Names Director for Office of Indian Energy Policy and Makes Available $2 Million for Clean Energy Projects on Tribal Lands September 14, 2007 - 2:33pm Addthis WASHINGTON, DC - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the appointment of Steven J. Morello to be Director of DOE's newly formed Office of Indian Energy Policy and Programs. As Director of this office, Mr. Morello will work to implement and manage energy planning, education and efficiency for American Indian tribes. Also today, the Secretary announced that DOE's Office of Energy Efficiency and Renewable Energy would make available a total of up to $2 million for

292

Department of Energy Names Director for Office of Indian Energy Policy and  

Broader source: Energy.gov (indexed) [DOE]

Names Director for Office of Indian Energy Names Director for Office of Indian Energy Policy and Makes Available $2 Million for Clean Energy Projects on Tribal Lands Department of Energy Names Director for Office of Indian Energy Policy and Makes Available $2 Million for Clean Energy Projects on Tribal Lands September 14, 2007 - 2:33pm Addthis WASHINGTON, DC - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the appointment of Steven J. Morello to be Director of DOE's newly formed Office of Indian Energy Policy and Programs. As Director of this office, Mr. Morello will work to implement and manage energy planning, education and efficiency for American Indian tribes. Also today, the Secretary announced that DOE's Office of Energy Efficiency and Renewable Energy would make available a total of up to $2 million for

293

Energy solutionsóDirector Eric Isaacs  

SciTech Connect (OSTI)

Argonne's Director Eric Isaacs talks about the laboratory's efforts for creating new, clean energy solutions.

Eric ISaacs

2012-08-08T23:59:59.000Z

294

Energy solutions?Director Eric Isaacs  

ScienceCinema (OSTI)

Argonne's Director Eric Isaacs talks about the laboratory's efforts for creating new, clean energy solutions.

Eric ISaacs

2013-06-05T23:59:59.000Z

295

Microsoft Word - CX-DixieSubstationUpgradesFY11_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of secondary containment facilities at Dixie Substation Budget Information: Work Order: 00004952 Categorical Exclusion Applied (Appendix B to Subpart D, 10 C.F.R. Part 1021): B4.6: Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms. Location: PLS T1S R8E S1 Dixie Substation in Elmore County, Idaho.

296

Microsoft Word - CX_TunkRadioStationUpgrade_2012.docx  

Broader source: Energy.gov (indexed) [DOE]

May 30, 2012 May 30, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Tunk Mountain Radio Station Upgrade Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19- Siting/construction/operation of microwave/radio communication towers Location: Synarep, Okanogan County, WA Township 35N, Range 29E, and Section 8 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA plans to upgrade its Tunk Mountain Radio Station in the Tonasket Ranger District of the Okanogan-Wenatchee National Forest. BPA is coordinating with the U.S. Forest Service (USFS) to ensure the existing land use permit is

297

Microsoft Word - AlbionButteRSCommunicationUpgrade-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

4, 2011 4, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Albion Butte Radio Station Communication Upgrade Budget Information: Work Order # 00253466 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Location: Cassia County, Idaho - Section 19, Township 11 South, Range 26 East of the Nibbs Creek Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade the communication building and equipment at BPA's Albion Butte Radio Station located in Cassia County, ID. This project is part of an

298

Microsoft Word - Holcomb and Naselle Communication Upgrade CX.doc  

Broader source: Energy.gov (indexed) [DOE]

6, 2011 6, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Holcomb Radio Station and Naselle Substation Communication Upgrade Project Budget Information: Work Order # 00253203 and # 00253206 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Locations: Holcomb Radio Station: Pacific County, Washington - Township 13 North, Range 7 West, Section 30 of the Lebam Quadrangle Naselle Substation: Pacific County, Washington - Township 10 North, Range 9 West, Section 4 of the Oman Ranch Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to upgrade the communication equipment at

299

Microsoft Word - CX-2013ElectronicEquipmentUpgrades_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

April 12, 2013 April 12, 2013 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Cleareance Memorandum Molly Kovaka Bob Trismen Contractor - TEP-CSB-2 Electrical Engineer - TEP-CSB-1 Proposed Action: Electronic Equipment Upgrades and Emergency Generator Replacements PP&A Project No: 2571 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment; B1.3 Routine maintenance activities Location: Multiple locations within Bonneville Power Administration's (BPA) service area. Proposed by: BPA Description of the Proposed Action: BPA proposes to upgrade electronic equipment required for operation of its transmission grid and replace emergency generators. Several types of actions involving communications, meters, relays, and Remedial Action Scheme (RAS) and Supervisory

300

California Member Connects Solar Adoption With Upgrades  

Broader source: Energy.gov [DOE]

Studies on the connection between solar adoption and energy upgrades by Better Buildings Residential Network member Center for Sustainable Energy (CSE) in California are helping solar companies...

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

BIOREFINING COMPOUNDS AND ORGANOCATALYTIC UPGRADING METHODS ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

invention provides new methods for the direct umpolung self-condensation of 5-hydroxymethylfurfural (HMF) by organocatalysis, thereby upgrading the readily available substrate...

302

Upgrade Boilers with Energy-Efficient Burners  

SciTech Connect (OSTI)

This revised ITP steam tip sheet on upgrading boilers provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

303

Metal Organic Framework Adsorbent for Biogas Upgrading  

Science Journals Connector (OSTI)

In this context, this adsorbent can be used for biogas upgrading to produce biomethane and reduce fossil-fuel CO2. ...

Simone Cavenati; Carlos A. Grande; AlŪrio E. Rodrigues; Christoph Kiener; Ulrich MŁller

2008-07-25T23:59:59.000Z

304

Solar Classroom Update: Making Clean Energy Upgrades a Back-to-School  

Broader source: Energy.gov (indexed) [DOE]

Classroom Update: Making Clean Energy Upgrades a Classroom Update: Making Clean Energy Upgrades a Back-to-School Priority Solar Classroom Update: Making Clean Energy Upgrades a Back-to-School Priority August 21, 2013 - 2:52pm Addthis Watch as Aaron Sebens, a fourth-grade teacher in Durham, North Carolina, gives an update on his student's solar-powered classroom project. Erin R. Pierce Erin R. Pierce Digital Communications Specialist, Office of Public Affairs Clean Energy Resources Watch our first video on the solar-powered classroom. Check out Lawrence Berkeley National Laboratory's guide on planning and financing energy upgrades for schools. Visit Energy Saver for more resources on saving energy and money. This week, Energy.gov is heading back to school. We'll be featuring stories on the role students and schools play in driving America's energy

305

Program & Project Management For The Acquisition Of Capital Assets  

Broader source: Energy.gov (indexed) [DOE]

2009 2009 Office of Management Office of Engineering and Construction Management Operational Organization Chart (FY 09) Office of Engineering & Construction Management POLICY - GUIDANCE -OVERSIGHT Pete Check Deputy Director Les Novitsky - Management Analyst Rosalyn Matthews - Program Support Specialist EIR Program Analyst (NISC) - Monica Morris Pete Check Deputy Director Les Novitsky - Management Analyst Rosalyn Matthews - Program Support Specialist EIR Program Analyst (NISC) - Monica Morris Robert Raines Director for Project Management Systems & Assessments Robert Raines Director for Project Management Systems & Assessments Peter O'Konski Director for Facilities Management & Professional Development Peter O'Konski Director for Facilities Management & Professional Development

306

Patrick Scheuermann Center Director  

E-Print Network [OSTI]

propulsion test facilities; and ensured Stennis continued to serve as the systems engineering center at Stennis for NASA's Reusable Launch Vehicle program, a NASA-industry effort to develop a new generation of rockets to safely and cost-effectively send payloads to space. He also served as project manager

307

CROWN HEIGHTS DIRECTOR'S NOTES  

E-Print Network [OSTI]

project to examine the effects of school gardens on fruit and vegetable consumption and other outcomes and the teaching/research agenda of the university is ongoing -- requiring constant communication about needs Based organizations to over 1700 farmers and food processors in New York State. Local food pantries

308

Energy Department's Data Director Named Presidential Innovation Fellow |  

Broader source: Energy.gov (indexed) [DOE]

Department's Data Director Named Presidential Innovation Department's Data Director Named Presidential Innovation Fellow Energy Department's Data Director Named Presidential Innovation Fellow August 23, 2012 - 5:14pm Addthis The Presidential Innovation Fellows being sworn in today. | Photo courtesy of the Office of Science and Technology Policy. The Presidential Innovation Fellows being sworn in today. | Photo courtesy of the Office of Science and Technology Policy. John Chu John Chu Communications Specialist with the Office of Energy Efficiency and Renewable Energy What does this project do? The Presidential Innovation Fellows program pairs top innovators from the private sector, non-profits, and academia with top innovators in government to collaborate on solutions that aim to deliver significant results in six months.

309

ATLAS Upgrade Week 1 November 10, 2010  

E-Print Network [OSTI]

VCSEL/PIN Irradiation Study radiation hardness of VCSEL/PIN arrays since 2006: vendors: AOC arrays (2010): see next slides AOC 10 Gb/s VCSEL (2010): see next slides #12;K.K. Gan ATLAS Upgrade/cm2: 76% consistent with NIEL hypothesis #12;K.K. Gan ATLAS Upgrade Week 9 Irradiation of AOC

Gan, K. K.

310

NSTXpool Computer Upgrade December 9, 2010  

E-Print Network [OSTI]

NSTXpool Computer Upgrade WP #1685 Bill Davis December 9, 2010 #12;Work Scope Upgrade Operating System, Application Software, and Programs that run on NSTX computers using Red Hat Enterprise Linux 3. nstxpool computers + nstxops nstxWindowsPC (Control Room Display Wall) Big Blue cluster for EFIT Selected

Princeton Plasma Physics Laboratory

311

LHC set to halt for upgrades  

Science Journals Connector (OSTI)

... particle collider is ready to take a well-earned rest. The Large Hadron Collider (LHC) will shut down on 11†February ahead of around two years of upgrade work. ... there will be no long holiday for the thousands of physicists who depend on the LHC for their data. A bruising schedule of maintenance, upgrades and forward planning will keep ...

Geoff Brumfiel

2013-02-06T23:59:59.000Z

312

MMCR Upgrades: Present Status and Future Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MMCR Upgrades: Present Status and Future Plans MMCR Upgrades: Present Status and Future Plans K. B. Widener and A. S. Koontz Pacific Northwest National Laboratory Richland, Washington K. P. Moran and K. A. Clark National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado C. Chander STC xxxxxxxxx M. A. Miller and K. L. Johnson Brookhaven National Laboratory Upton, New York Abstract In September 2003, the Southern Great Plains (SGP) millimeter wave cloud radar (MMCR) was upgraded to a new digital signal processor that significantly increases the temporal resolution and the processing capability of the MMCR. The Barrow MMCR upgrade will be completed in early 2004. We will discuss the hardware and software C40 upgrade to the MMCRs at SGP and Barrow and the plans

313

Research Laboratory Experiments with Energy Efficiency Upgrades |  

Broader source: Energy.gov (indexed) [DOE]

Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades August 30, 2012 - 11:52am Addthis Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Julie McAlpin Communications Liaison, State Energy Program

314

Future Upgrades | Brookhaven and the LHC  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Future Upgrades Future Upgrades Magnetic field inside a Nb3Sn quadropole magnet Magnetic field inside a Nb3Sn quadropole magnet. Brookhaven leads various technical coordination efforts for the upgrade of the ATLAS detector, including constructing the new silicon tracker, liquid argon electronics, and the new muon chambers. Brookhaven also contributes to the commissioning and future upgrade of the LHC itself in two areas: accelerator physics and superconducting magnets. This work is carried out as part of the U.S. LHC Accelerator Research Program (LARP) in collaboration with Fermilab, Lawrence Berkeley National Lab, and the Stanford Linear Accelerator Center. The ultimate goal of the upgrade program is to increase the rate and efficiency of particle collisions, a measure known as luminosity.

315

Research Laboratory Experiments with Energy Efficiency Upgrades |  

Broader source: Energy.gov (indexed) [DOE]

Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades August 30, 2012 - 11:52am Addthis Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Julie McAlpin Communications Liaison, State Energy Program

316

Statement of Charles G. Groat Director, U.S. Geological Survey, U.S. Depa...rce and Agency Organization, On The Yucca Mountain Project, April 5, 2005 Congressional Testimony, 2005  

E-Print Network [OSTI]

Organization, On The Yucca Mountain Project, April 5, 2005 Congressional Testimony, 2005 Statement of Charles G on Government Reform, Subcommittee on the Federal Workforce and Agency Organization On The Yucca Mountain's (DOE) Yucca Mountain Project. Let me emphasize from the outset how seriously USGS takes this situation

Torgersen, Christian

317

Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About About Printable Version Share this resource Send a link to Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades to someone by E-mail Share Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Facebook Tweet about Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Twitter Bookmark Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Google Bookmark Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Delicious Rank Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Digg Find More places to share Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on AddThis.com... Our History Related Federal Programs Why Energy Efficiency Upgrades

318

EECBG Success Story: Energy Efficiency Upgrades Part of Winning...  

Energy Savers [EERE]

EECBG Success Story: Energy Efficiency Upgrades Part of Winning Formula for Oregon School District EECBG Success Story: Energy Efficiency Upgrades Part of Winning Formula for...

319

Federal Finance Facilities Available for Energy Efficiency Upgrades...  

Energy Savers [EERE]

Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy...

320

Algal Lipid Extraction and Upgrading to Hydrocarbons Technology...  

Broader source: Energy.gov (indexed) [DOE]

and upgrading pathway to be competitive with petroleum-derived gasoline-, diesel-, and jet-range hydrocarbon blendstocks. Algal Lipid Extraction and Upgrading to Hydrocarbons...

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Weatherization and Workforce Guidelines for Home Energy Upgrades...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for Home Energy Upgrades Fact Sheet Weatherization and Workforce Guidelines for Home Energy Upgrades Fact Sheet This fact sheet provides essential information about the 2011...

322

Standard Work Specifications for Single-Family Home Energy Upgrades...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for Single-Family Home Energy Upgrades to define the minimum requirements for high- quality residential energy upgrades. The Standard Work Specifications for Single-Family...

323

Standard Work Specifications for Single-Family Home Energy Upgrades...  

Broader source: Energy.gov (indexed) [DOE]

for Single-Family Home Energy Upgrades to define the minimum requirements for high-quality residential energy upgrades. Today, the Standard Work Specifications provide a...

324

Tom Rogers Director, Industrial Partnerships  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tom Rogers, rogerstc@ornl.gov 865-241-2149 Tom Rogers, rogerstc@ornl.gov 865-241-2149 Tom Rogers Director, Industrial Partnerships and Economic Development Tom Rogers was named Director of Industrial Partnerships and Economic Development at the Oak Ridge National Laboratory in June, 2008. His responsibilities include directing engagements with industrial partners, forging new ORNL entrepreneurial support efforts, and leading a number of strategic initiatives such as the Carbon Fiber Composites Cluster and development of the Oak Ridge Science and Technology Park. Prior to joining ORNL, Tom was the founding President and CEO of Technology 2020, a national award-winning public-private partnership focused on a building a robust regional entrepreneurial support system. Tom has also served as the Executive Director of the Tennessee Technology

325

ATLAS Nightly Build System Upgrade  

E-Print Network [OSTI]

The ATLAS Nightly Build System is a facility for automatic production of software releases. Being the major component of ATLAS software infrastructure, it supports more than 50 multi-platform branches of nightly releases and provides ample opportunities for testing new packages, for verifying patches to existing software, and for migrating to new platforms and compilers. The Nightly System testing framework runs several hundred integration tests of different granularity and purpose. The nightly releases are distributed and validated, and some are transformed into stable releases used for data processing worldwide. The first LHC long shutdown (2013-2015) activities will elicit increased load on the Nightly System as additional releases and builds are needed to exploit new programming techniques, languages, and profiling tools. This paper describes the plan of the ATLAS Nightly Build System Long Shutdown upgrade. It brings modern database and web technologies into the Nightly System, improves monitoring of nigh...

Dimitrov, G; The ATLAS collaboration; Simmons, B; Undrus, A

2013-01-01T23:59:59.000Z

326

Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4  

Broader source: Energy.gov (indexed) [DOE]

Hydropower Upgrades to Yield Added Generation at Average Costs Less Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4 cents per kWh - Without New Dams Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4 cents per kWh - Without New Dams November 4, 2009 - 12:00am Addthis WASHINGTON, DC - U.S. Energy Secretary Steven Chu today announced up to $30.6 million in Recovery Act funding for the selection of seven hydropower projects that modernize hydropower infrastructure by increasing efficiency and reducing environmental impacts at existing facilities. The expanded hydro generation projects have estimated incremental costs of less than 4 cents per kWh on average. The selections announced today will deploy innovative technologies such as high-efficiency, fish-friendly turbines, improved water intakes, and

327

Microsoft Word - CX-Big Eddy-TroutdaleUpgradeFY12_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

Erich Orth Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Big Eddy - Troutdale No. 1 230 kV Transmission Line Upgrade Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B4.13, Upgrading and Rebuilding Existing Powerlines. Location: Wasco, Hood River and Clackamas counties, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The project, as proposed, is the thermal upgrade of the BPA Big Eddy - Troutdale No.1 230 kV Transmission Line: Background BPA's Big Eddy - Troutdale No. 1 230-kV transmission line is one of three major transmission lines that cross the Oregon Cascade Mountains. These lines transport The Dalles hydro generation and northwest wind generation output in the east to load centers west of the Cascades, like

328

Oak Ridge National Laboratory - Facilities and Operations Directorate  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facilities and Operations Directorate Administrative information for the Facilities and Operations Directorate is provided below. Contacts Jimmy Stone, Director Kay Thacker,...

329

Oak Ridge National Laboratory - Audit and Oversight Directorate  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Internal Audit Directorate Administrative information for the Internal Audit Directorate is provided below. Contacts C. Gail Lewis, CIA, CISA, CFE, CPA (inactive) - IAD Director...

330

Microsoft Word - CX-Olympia-SouthElma_upgrades_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

0, 2011 0, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: The project consists of upgrades to the Olympia-South Elma No. 1, 115-kV transmission line from structure 21/10 to Elma Substation. Budget Information: Work Order #251089 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not effect the environment beyond the previously developed facility area including but not limited to....tower modifications, changing insulators, and replacement of poles ...conductors...and crossarms. Location: The project is located in Grays Harbor County, Washington along Bonneville Power

331

Energy Star Building Upgrade Manual Retrocommissioning Chapter 5  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5. Retrocommissioning 5. Retrocommissioning Revised October 2007 5. Overview 2 Energy and Non-energy Benefits 3 5.2 Project Planning 5 Selecting a Project 5 Benchmarking 5 Selecting a Provider and Team 6 Developing a Scope of Work 7 5.3 Project Execution 7 Implementing the Recommendations 8 Maintaining the Benefits 9 Planning for Recommissioning 10 5.4 Tune-up Opportunities  Lighting 11 Supplemental Loads 12 Distribution Systems 13 Heating and Cooling Systems 14 5.5 Summary 6 Bibliography 7 Glossary G- ENERGY STAR ¬ģ Building Manual 2 5. Retrocommissioning 5. Overview Retrocommissioning is the first stage in the building upgrade process. The staged approach accounts for the interactions among all the energy flows in a building (Figure 5.1) and pro-

332

Energy Efficiency Upgrades for Little Rock Air Force Base  

SciTech Connect (OSTI)

Little Rock Air Force Base (LRAFB), in partnership with the local utility, Entergy Services, Inc., has reduced energy costs and used savings from investments in high-efficiency equipment to maintain and improve the condition of base housing and other facilities. Three projects were completed, with over $10 million invested. Major accomplishments include replacing air-to-air heat pumps with high-efficiency ground-source heat pumps (GSHPs) in more than 1,500 base housing units, lighting modifications to 10 buildings, upgrade of HVAC equipment in the base's enlisted club, and energy-efficient lighting retrofits for LRAFB's flight simulator.

Goldman, C.; Dunlap, M.A.

2000-11-13T23:59:59.000Z

333

High Temperature Materials Laboratory (HTML) - PSD Directorate  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

filler A National Resource for Collaborative Materials Research The High Temperature Materials Laboratory (HTML) User Program is on hiatus due to federal budget reductions. However, research projects at the HTML still may be conducted on a cost-recovery basis through the Work for Others (WFO) Program or under a Cooperative R&D Agreement (CRADA). Dr. Edgar Lara-Curzio, HTML Director Tel: 865.574.1749 Fax: 865.574.4913 laracurzioe@ornl.gov Christine Goudy, Administrative Specialist Tel: 865.574.8295 Fax: 865.574.4913 goudyc@ornl.gov Oak Ridge National Laboratory [MST Home] [ORNL Home] [Site Index] [Search][Disclaimer] [Webmaster] Oak Ridge National Laboratory is a national multi-program research and development facility managed by UT-Battelle, LLC for the U.S. Department of Energy

334

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

confident~~al." These site names were provided to Col. Spence confident~~al." These site names were provided to Col. Spence In a subsequent letter and are not Included on the enclosed lfst. If,you have any questions regarding this letter, call me at 353-4716. Questions regarding the lfst or spedfic sites should be dlrected to Mr. Andrew Wallo of my staff at.353-5439. - Sincerely, J James J. Fiore, Director Divisjon of Facility and Site Decoainissioning Projects Office'of Nuclear Energy 3 Enclosures bee: Aerospace' NE-20 RF \,NE-23 RF Wallo RF NEG (4) x NE-23:AWallo:ph:353-5439:5/28/87:IBM:148/9: NE-23 >J.%= 5K%7 NE-23 Fiore @?f87 ENCLOSURE 1 , .., ;: v: ., . '" ._~ .> DEPARTMENT OF THE Installation/Facility 1. Alabama Ordnance Works Sylacauga, AL ;' 2. Morgantown Ordnance Works Morgantown, WV

335

Portsmouth Gaseous Diffusion Plant Director's Final Findings and Orders, October 4, 1995  

Broader source: Energy.gov (indexed) [DOE]

Portsmouth Gaseous Diffusion Plant Director's Final Portsmouth Gaseous Diffusion Plant Director's Final Findings and Orders, October 4, 1995 BEFORE THE OHIO ENVIRONMENTAL PROTECTION AGENCY In the Matter Of: United States Department of Energy : Director's Final Portsmouth Gaseous Diffusion Plant : Findings and Orders P.O. Box 700 : Piketon, Ohio 45661-0700 : Respondent It is hereby agreed by and among the parties hereto as follows: Table of Contents I. Jurisdiction II. Parties Bound III. Definitions IV. Findings of Fact V. Orders VI. Limitations of Director's Approval VII. Notice VIII. Project Managers IX. Dispute Resolution X. Funding XI. Other Applicable Laws XII. Reservation of Rights XIII. Modification XIV. Termination XV. Other Claims XVI. Signatories XVII. Waiver I. Jurisdiction These Director's Final Findings and Orders ("Orders") are issued to the United States

336

Executive Director for Campus Planning &  

E-Print Network [OSTI]

, Robert HVAC Tech Hiscoe, Steve Plumber Lead Nance, Brett Students (18) Building Maint/ Landscape Proposed Laborer Proposed Asst. Director Zone Management TBA Program Coord/ Admin Asst. Housing Maintenance Management 7 ­ 10 Employees General Maintenance Mechanic SMSU General Maintenance Mechanic UPL Trades

Veerman, J. J. P.

337

Director of Risk Management & Insurance  

E-Print Network [OSTI]

ORGANIZATIONAL CHART 05-13-2014 Director of Environmental Health & Safety 10162 Darius Griffin, BS, MPA CSP Allen, BS, MS, PHR Chemical Safety Specialist 010167 Benjamin Teal, BS, MS, CSP Industrial Hygienist 010164 Bruce Crowell, BS, CSP, CIH Safety & Health Specialist 010055 Jamario Poole, BS (TEMP) Fire Safety

Howitt, Ivan

338

Director of Risk Management & Insurance  

E-Print Network [OSTI]

& Safety 10162 Darius Griffin, BS, MPA CSP Director of Business Continuity 134 Christopher R. Gonyar, MPA Teal, BS, MS, CSP Industrial Hygienist 010164 VACANT Safety & Health Specialist 010055 Jamario Poole Safety Manager 010166 Bruce Crowell, BS, CSP, CIH 8/20/2014 #12;

Howitt, Ivan

339

Los Alamos Appoints Interim Director  

Science Journals Connector (OSTI)

...down as director of Los Alamos National Laboratory...which operates Los Alamos for the Department of...scientists. A series of suspensions following the disappearance...rocky tenure at Los Alamos. CREDIT: JEFF GEISSLER...anonymous comments from lab employees. Last month, Sandia...

Eli Kintisch

2005-05-13T23:59:59.000Z

340

Computing and Computational Sciences Directorate - Contacts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bartell Chief Information Officer Information Technologies Services Division Jim Hack Director, Climate Science Institute National Center for Computational Sciences Shaun...

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Duffield named director of Argonne National Laboratory  

Science Journals Connector (OSTI)

Duffield named director of Argonne National Laboratory ... Dr. Robert B. Duffield has been appointed to succeed Dr. Albert V. Crewe as director of Argonne National Laboratory, the huge Atomic Energy Commission research facility near Chicago. ... Dr. Crewe, Argonne's director since 1961, resigned June 1 to return to teaching and research as professor of physics at the University of Chicago. ...

1967-08-28T23:59:59.000Z

342

Bruce Brodie, Managing Director Bruce Brodie  

E-Print Network [OSTI]

1PwC Bruce Brodie, Managing Director Bruce Brodie Managing Director, Insurance Advisory Telephone: 203.864.5204 E-mail: bruce.brodie@us.pwc.com Bruce is a Managing Director in PwC's Financial Services companies. · He has more than 30 years of experience in the insurance industry and has held a number

Sadeh, Norman M.

343

Executive Director Carleton Sustainable Energy Research Centre  

E-Print Network [OSTI]

Executive Director Carleton Sustainable Energy Research Centre Carleton University is seeking to appoint an Executive Director to its Sustainable Energy Research Centre. This Centre is one of a series of recent Carleton initiatives in the area of sustainable energy. The Executive Director

Dawson, Jeff W.

344

Operations Directorate Integrated Safety and Environmental Management Systems  

E-Print Network [OSTI]

Operations Directorate Integrated Safety and Environmental Management Systems (ISEMS) Plan Directorate Integrated Safety and Environmental Management System (ISEMS) Plan The Operations Directorate, Operations Date #12;The Operations Directorate ISEMS Plan 032108 bf 2 Annual Review and Update Operations

Wechsler, Risa H.

345

12 GeV Upgrade | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages

Science Science A Schematic of the 12 GeV Upgrade The 12 GeV Upgrade will greatly expand the research capabilities of Jefferson Lab, adding a fourth experimental hall, upgrading existing halls and doubling the power of the lab's accelerator. A D D I T I O N A L L I N K S: 12 GeV Home Public Interest Scientific Opportunities Hall D Status Updates Contacts Three-Year Accelerator Schedule 2014 - 2016 top-right bottom-left-corner bottom-right-corner 12 GeV Upgrade Physicists at Jefferson Lab are trying to find answers to some of nature's most perplexing questions about the universe by exploring the nucleus of the atom. Their goal is to answer such questions as: "What is the universe made of?" and "What holds everyday matter together?" In their search for answers, physicists smash electrons into atoms using

346

PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES  

Broader source: Energy.gov [DOE]

Designed to promote energy efficiency in buildings in Phoenix, Arizonaís 10-mile-long Light Rail Corridor, Energize Phoenix focused on performing energy upgrades and reducing energy use in...

347

EMPOWERING SANTA BARBARA TO INVEST IN UPGRADES  

Broader source: Energy.gov [DOE]

In Santa Barbara County, California, the weather is so temperate that even the least energy-efficient homes can still feel comfortable year-round. To help residents see that energy upgrades can...

348

MAST Upgrade Advancing compact fusion sources  

E-Print Network [OSTI]

as a stepping stone to greater involvement in the fusion sector and, in particular, the commercial opportunities to fusion research. MAST Upgrade will build on this progress, providing a truly world-class device capable

349

Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Honeymoons Honeymoons Lead to Upgrades in Western Vermont to someone by E-mail Share Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Facebook Tweet about Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Twitter Bookmark Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Google Bookmark Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Delicious Rank Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Digg Find More places to share Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on AddThis.com... Better Buildings Residential Network Progress

350

High Flux Isotope Reactor power upgrade status  

SciTech Connect (OSTI)

A return to 100-MW operation is being planned for the High Flux Isotope Reactor (HFIR). Recent improvements in fuel element manufacturing procedures and inspection equipment will be exploited to reduce hot spot and hot streak factors sufficiently to permit the power upgrade without an increase in primary coolant pressure. Fresh fuel elements already fabricated for future use are being evaluated individually for power upgrade potential based on their measured coolant channel dimensions.

Rothrock, R.B.; Hale, R.E. [Oak Ridge National Lab., TN (United States); Cheverton, R.D. [Delta-21 Resources Inc., Oak Ridge, TN (United States)

1997-03-01T23:59:59.000Z

351

SC Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Projects Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated November 2013) Project Construction Photos Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov SC Projects Print Text Size: A A A RSS Feeds FeedbackShare Page SC Projects-Contains information regarding SC projects including project review dates, information on Office of Science Certified Federal Project Directors and Defining the Leadership Traits/Skill Set for a Successful Federal Project Director, and project photos or links to project photo sites. Last modified: 3/18/2013 10:54:36

352

INCITE grants awarded to 56 computational research projects ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

groundbreaking computational research projects in science and engineering," added James Hack, director of the National Center for Computational Sciences, which houses the Oak Ridge...

353

Politics, Public Opinion, and Project Design in California Road Pricing  

E-Print Network [OSTI]

Unpublished Data) 13. Beal, Dan. Managing Director, Publicthe project is debated. Dan Beal (13) of the Automobile Clubagainst lifeline pricing. Beal (13) asserts that the

Smirti, Megan; Evans, Alexandra; Gougherty, Michael; Morris, Eric

2007-01-01T23:59:59.000Z

354

Multifamily Projects  

Broader source: Energy.gov [DOE]

Presents Energy Smart Colorado's approach to driving demand for multifamily residential energy efficiency upgrades.

355

Disruption Analysis and Response Implicattions of Passive Plates for the NSTX Upgrade  

SciTech Connect (OSTI)

The NSTX upgrade project requires analysis qualifications of existing vacuum vessel and passive stabilizing plates for increased plasma performance. Vertical stability is critically dependent on the passive conducting structure that surrounds the plasma. In this paper, the passive conducting structure is analyzed for the upgrade condition during plasma disruption to ensure the level of stress in the stabilizing plates and the fastener is within its design limits. The counter-bore of the passive plates for bolting is evaluated in details and counter-bore bushing is redesigned to prevent shear failure during disruptions as a result of high pulling and pushing forces, particularly for support at the corner bolts

Yuhu Zhai, Peter Titus, Art Brooks, and Ron Hatcher

2012-08-27T23:59:59.000Z

356

Director's Discretionary Research and Development Program: Annual Report, Fiscal Year 2006  

SciTech Connect (OSTI)

The Director's Discretionary Research and Development Program, Annual Report Fiscal Year 2006 is an annual management report that summarizes research projects funded by the DDRD program. The NREL DDRD program comprises projects that strengthen NREL's four technical competencies: Integrated Systems, Renewable Electricity, Renewable Fuels, and Strategic Analysis.

Not Available

2007-03-01T23:59:59.000Z

357

Fermilab | Directorate | Office of Integrated Planning & Performance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Office of Integrated Planning & Performance Management (IPPM) Office of Integrated Planning & Performance Management (IPPM) Integrated Planning Diagram Integrated Planning Diagram [Download PPT] Mission: The Office of Integrated Planning and Performance Management (IPPM) within the Fermilab Directorate provides systems and management processes for institutional planning and performance assessment and evaluation. The office of IPPM leads multi-year, forward-looking planning and integration of institutional plans, programs, projects, operations and budgets. In addition it develops, implements and maintains integrated laboratory systems and management processes for strategic planning and goal setting, project and program oversight, enterprise risk management and performance planning and oversight. IPPM Facilitates:

358

AN APPLICATION OF GAME THEORY: FUNDING INTERDEPENDENT MC and A UPGRADE DECISIONS  

SciTech Connect (OSTI)

Funding Material, Control and Accountability (MC&A) system upgrades has been identified as a partial solution for mitigating the diversion threat of weapons-grade nuclear material. Effective MC&A system upgrades are dependent on appropriate decisions based on based on funding, implementation, operation and oversight. Traditional MC&A upgrade decisions inherently assumed that all decision-makers possessed similar payoff vectors allowing for a fairly consistent and unified approach to MC&A system enhancements; however, MC&A upgrade projects in non-traditional environments may be required to take into account situations where the potential payoff vectors among decision-makers may be significantly different. Once a decision-maker is required to take into account the decisions of others, the process can be modeled as a game. Game theory has been previously be used to shed light on many aspects of social and economic behavior where a payoff from a set of strategies is dependent on the strategy of others. In this paper, the application of game theory in the context of MC&A upgrades is discussed. Various MC&A upgrades decision payoff matrices for relevant circumstances are evaluated for static (simultaneous) and dynamic (sequential decisions) games. Optimal strategies and equilibrium conditions for these payoff matrices are analyzed. Additional game factors (bargaining, uncertain outcomes, moral hazards) that may affect the outcome of the game are briefly discussed. By demonstrating the application of game theory to a nontraditional environment that may require MC&A upgrades, this work increases the understanding out how outcomes are logically connected to the respective value decision-makers assign to choices.

B. G. SCOTT

2001-06-01T23:59:59.000Z

359

Guidelines for Home Energy Professionals Project: Benefits for Home Energy Workers  

Broader source: Energy.gov [DOE]

The Guidelines for Home Energy Professionals project fosters the growth of a high-quality residential energy upgrade market and a skilled, credentialed workforce.

360

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network [OSTI]

kV†line†is†upgraded. † The†Tehachapi†Renewable†Transmission†Transmission†Project†and†the†Palo†Verde/Harquahala?Devers†No. †2† 500†kV†line†

Budhraja, Vikram

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Project Management | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management Management Project Management Project Directors are responsible for the planning, programming, budgeting and acquisition of capital assets. One of the principal outcomes in exercising this responsibility is the delivery of projects on schedule, within budget, with the required performance capability, and compliant with quality, environmental, safety and health standards. These web pages identify the DOE requirements related to the acquisition of capital assets and present a common framework for implementing the requirements. Our intent is not to impose additional requirements, but rather place existing requirements in the proper context. The target audience for these pages includes Federal Project Directors, Program Managers, Acquisition Executives, and others involved in the DOE capital asset acquisition

362

Energy Upgrades to Save Small Arizona Town Big Money | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Upgrades to Save Small Arizona Town Big Money Upgrades to Save Small Arizona Town Big Money Energy Upgrades to Save Small Arizona Town Big Money July 19, 2010 - 1:00pm Addthis An aerial shot of Oro Valley, Ariz.'s town hall campus shows proposed solar locations. | Photo courtesy of Oro Valley An aerial shot of Oro Valley, Ariz.'s town hall campus shows proposed solar locations. | Photo courtesy of Oro Valley Temperatures above 100 degrees mean that staying cool and being energy efficient is important to the small town of Oro Valley, Ariz. But finding the funds to do both can be a challenge. It was this heat - and the availability of a federal grant - that Bayer Vella, the town's conservation and sustainability manager, cited as a reason the city is forging ahead with energy retrofits and solar projects.

363

Oak Ridge EM Program Upgrades Environmental Database for Public's Ease of  

Broader source: Energy.gov (indexed) [DOE]

Upgrades Environmental Database for Public's Upgrades Environmental Database for Public's Ease of Use Oak Ridge EM Program Upgrades Environmental Database for Public's Ease of Use October 30, 2013 - 12:00pm Addthis Oak Ridge√ʬĬôs environmental database contains data from more than 14 million field samples. These samples provide a clear picture of clean and contaminated areas at the site. Oak Ridge's environmental database contains data from more than 14 million field samples. These samples provide a clear picture of clean and contaminated areas at the site. OAK RIDGE, Tenn. - Oak Ridge is working to remediate contaminated areas in one of the EM program's most diverse and complex cleanup sites due to the research and production that occurred there during the Manhattan Project and Cold War. Oak Ridge employees use an array of tools to educate the public about the

364

U.S.-Russia MPC and A upgrades at the Beloyarsk Nuclear Power Plant  

SciTech Connect (OSTI)

During the January 1996 meeting of the Gore-Chernomyrdin Commission, the Beloyarsk Nuclear Power Plant (BNPP) was identified as one of the additional sites for cooperative projects on upgrading Materials Protection, Control and Accounting (MPC and A). Since June 1996, Sandia National Laboratories (SNL), Pacific Northwest National Laboratories (PNNL), and Los Alamos National Laboratory (LANL) have worked with BNPP to upgrade MPC and A at the facility. Some unique challenges were encountered because BNPP has an operating BN-600 600-Megawatt breeder reactor. SNL has been responsible for working with BNPP to implement physical protection upgrades to the Central Alarm Station, Fresh Fuel Storage building, Spent Fuel Storage Area, and Vehicle/Personnel Portal. In addition, improved communication equipment for the Ministry of the Interior (MVD) guards and training of personnel were provided. PNNL has been responsible for coordinating Material Control and Accounting (MC and A) upgrades at BNPP. PNNL, in conjunction with LANL, has implemented such MC and A upgrades as a computerized nuclear materials accounting system, training in MC and A elements, nondestructive assay instrumentation for fresh fuel, installation of a fork detector for measuring spent fuel, and installation of an underwater video camera for verification of spent fuel serial numbers.

Saraev, O. [Beloyarsk Nuclear Power Plant, Zarechny (Russian Federation); Haase, M.; Smarto, C. [Dept. of Energy, Washington, DC (United States); Mikkelsen, K.; Heinberg, C. [Pacific Northwest National Labs., Richland, WA (United States); Showalter, R.; Soo Hoo, M. [Sandia National Labs., Albuquerque, NM (United States); Hatcher, C.; Forehand, M. [Los Alamos National Lab., NM (United States)

1998-08-01T23:59:59.000Z

365

Climate balance of biogas upgrading systems  

SciTech Connect (OSTI)

One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading) method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO{sub 2}.

Pertl, A., E-mail: andreas.pertl@boku.ac.a [Institute of Waste Management, Department of Water, Atmosphere and Environment, University of Natural Resources and Applied Life Sciences, Vienna, Muthgasse 107, A-1190 Wien (Austria); Mostbauer, P.; Obersteiner, G. [Institute of Waste Management, Department of Water, Atmosphere and Environment, University of Natural Resources and Applied Life Sciences, Vienna, Muthgasse 107, A-1190 Wien (Austria)

2010-01-15T23:59:59.000Z

366

Microsoft Word - CX-RossControlHouseSeismicUpgrades_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

1 1 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Leon Kempner Project Manager - TEL-TPP-3 Proposed Action: Perform structural upgrades to the Ross Control House to allow the building to withstand a seismic event. PP&A Project No.: PP&A-2051 Budget Information: Work Order # 00215487 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Ôā∑ B2.5 Safety and environmental improvements of a facility, including replacement and upgrade of facility components...Improvements may include...addition of structural bracing to meet earthquake standards... Location: The proposed project is located at the BPA Ross Control House within the Ross Complex in Vancouver, Washington. The facility is within the NW 1/4 of Section 14, Township 2 North,

367

Director  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Materials, the Eni Italgas Prize for Energy and Environment, the Rank Prize for Optoelectronics, the Wilson Prize at Harvard, the Coblentz Award for Advances in Molecular...

368

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

. PGE recently concluded a successful small-scale pilot project using algae to capture and consume CO2 expensive environmental upgrades and the risk of carbon regulations, PGE has proposed a plan to phase out

369

Principal Associate Director - Science, Technology, and Engineering  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Principal Associate Director - Science, Technology, and Engineering Principal Associate Director - Science, Technology, and Engineering Bishop oversees directorates of Chemistry, Life, and Earth Sciences; Engineering and Engineering Sciences; Experimental Physical Sciences; Information Technology; and Theory, Simulation, and Computation. Contact Operator Los Alamos National Laboratory (505 667-5061 Bishop is a Fellow of the American Physical Society, the Institute of Physics, and the American Association for the Advancement of Science; a recipient of the Department of Energy's E.O. Lawrence Award; a Humboldt Senior Fellow; and a LANL Fellow. Alan R. Bishop Principal Associate Director for Science, Technology, and Engineering Alan R. Bishop, Acting Principal Associate Director for Science, Technology and Engineering As Principal Associate Director for Science, Technology, and Engineering,

370

Photon Sciences Directorate at Brookhaven National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Directorate at Directorate at Brookhaven National Laboratory 2010 ANNUAL REPORT DISCOVERY 2010 AnnuAl RepoRt Photon Sciences Directorate at Brookhaven National Laboratory Photon Sciences Directorate at Brookhaven National Laboratory 2010 ANNUAL REPORT Kendra Snyder Editor Laura Mgrdichian Science Writer Mona S. Rowe Science Writer Tiffany Bowman Graphic Designer Office of Science the photon Sciences Directorate at Brookhaven national laboratory operates the national Synchrotron light Source (nSlS) and is constructing the national Synchrotron light Source II (nSlS-II). nSlS and nSlS-II are offi ce of Science user Facilities supported by the u.S. Department of energy offi ce of Science. 2010 AnnuAl RepoRt Photon Sciences Directorate at Brookhaven National Laboratory Disclaimer

371

Los Alamos director echoes cyber concerns  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Los Alamos director echoes cyber concerns Los Alamos director echoes cyber concerns Los Alamos director echoes cyber concerns Director Charlie McMillan told a gathering of energy executives that securing the electrical grid is a major concern now and it's only becoming more serious. May 21, 2013 Los Alamos National Laboratory Director Charlie McMillan (right), with, from left, Anthony Cugini of the National Energy Technology Laboratory, Thom Mason of Oak Ridge National Laboratory, and Tomas Diaz de la Rubia of Deloitte Consulting LLP. Los Alamos National Laboratory Director Charlie McMillan (right), with, from left, Anthony Cugini of the National Energy Technology Laboratory, Thom Mason of Oak Ridge National Laboratory, and Tomas Diaz de la Rubia of Deloitte Consulting LLP. Contact Fred deSousa

372

NSTX Upgrade Project STRUCTURAL CALCULATION OF THE TF FLAG KEY  

E-Print Network [OSTI]

, 2010 Prepared By: ___________________________________ Ali Zolfaghari, PPPL Mechanical Engineering=Ali Zolfaghari, o=PPPL, ou=Engineering, email=azolfagha@pppl.gov, c=US Date: 2011.01.18 12:59:35 -05'00' Thomas Willard Digitally signed by Thomas Willard DN: cn=Thomas Willard, o=Engineering, ou=PPPL, email=twillard@pppl

Princeton Plasma Physics Laboratory

373

ATLAS upgrade June09_v3  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ATLAS efficiency and intensity upgrade ATLAS efficiency and intensity upgrade Guy Savard and Robert V. F. Janssens June 12, 2009 The ATLAS facility is on a constant quest to improve and increase the capabilities it offers to its Users. ATLAS currently provides beams of essentially all stable isotopes at energies in the vicinity of the Coulomb barrier. These can be used in conjunction with a suite of state-of-the-art instruments such as Gammasphere, the Fragment Mass Analyzer (FMA), the Canadian Penning Trap mass spectrometer (CPT), the split-pole spectrograph, an in-flight radioactive beam line, and the recently commissioned HELIOS spectrometer. At present, these capabilities are being augmented by (1) the addition of the CARIBU upgrade, which will provide low-intensity, neutron-rich radioactive beams from Californium fission fragments in both low-energy and re-

374

Program & Project Management For The Acquisition Of Capital Assets  

Broader source: Energy.gov (indexed) [DOE]

February 3, 2011 February 3, 2011 Operational Organization Chart (FY 11) Office of Engineering & Construction Management POLICY - GUIDANCE -OVERSIGHT Pete Check Deputy Director Les Novitsky - Management Analyst (on detail) Rosalyn Matthews - Program Support Specialist EIR Program Analyst (IBM) - Monica Morris Robert Raines Director for Project Management Systems & Assessments Peter O'Konski Director for Facilities Management & Professional Development Paul Bosco Director Real Estate Tom Geronikos - Realty Spec Mark Price - Realty Spec David Steinau - Realty Spec Project Management James Fountain - Prog Analyst John Makepeace - Prog Analyst Cynthia Seiter - Prog Analyst Project Mgt Assessment Mike Peek - Gen Engr Tom Bruder- Gen Engr Brian Huizenga - Gen Engr Rick Elliott -- Gen Engr

375

iDirector with Tim Scheibe | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

interviews EMSL Lead Scientist Tim Scheibe about multiscale modeling and high-performance computing. Campbell talked with Scheibe as part of her monthly iDirector interview...

376

Oak Ridge National Laboratory - Business Services Directorate  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Business Services Administrative information for the Business Services Directorate is provided below. Contacts Scott Branham, Chief Financial Officer Renee Evans, Executive...

377

Computing and Computational Sciences Directorate - Computer Science...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Home Awards Awards Night 2012 R&D LEADERSHIP, DIRECTOR LEVEL Winner: Brian Worley Organization: Computational Sciences & Engineering Division Citation: For exemplary program...

378

Supervisory Public Affairs Specialist (Communications Director)  

Broader source: Energy.gov [DOE]

The Communications Director reports directly to the Deputy Administrator. Additional vacancies may be filled through this vacancy announcement or if they become available.

379

Dr. Edward Smith Director, International Center  

E-Print Network [OSTI]

Dr. Edward Smith Director, International Center Robinson 117 Rowan University President, Delta or at ic@rowan.edu. Sincerely, Edward C. Smith III

Rusu, Adrian

380

Name Title of Project Site Supervisor and  

E-Print Network [OSTI]

in Yolo County's Department of Public Health Hoa Tan, Program Director, Emergency Preparedness, Yolo Community Health Assessment Project Jill Cook, MS, RN, PHN, Director of Health, Yolo County Health Department 500 Jefferson Blvd. West Sacramento, CA 95691 (916) 375-6380 jill.cook@yolo county.org BK Yoo, MD

Leistikow, Bruce N.

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Magnetohydrodynamic projects at the CDIF  

SciTech Connect (OSTI)

This quarterly technical progress report presents the tasks accomplished at the Component Development and Integration Facility during the second quarter of FY91. Areas of technical progress this quarter included: coal system development; seed system development; test train/A-Bay modifications; channel power dissipation and distribution system development; oxygen system storage upgrade; iron-core magnet thermal protection system checkout; TRW slag rejector/CDIF slag removal project; Data Acquisition System; stack gas/environmental compliance upgrade; coal-fired combustor support; 1A channels fabrication and assembly; support of Mississippi State University diagnostic testing; test operations and results; data analysis and modeling; technical papers; and projected activities. 2 figs., 2 tabs.

Not Available

1991-01-01T23:59:59.000Z

382

TO: Procurement Directors FROM: Director Contract and Financial...  

Broader source: Energy.gov (indexed) [DOE]

and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Acquisition Guide 13.3 Simplified Acquisition Procedures...

383

TO: Procurement Directors FROM: Director Contract and Financial...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Office of Acquisition and Project Management SUBJECT: INCREMENTALLY FUNDING FIXED-PRICE ACTIONS SUMMARY: The purpose of this Flash is to inform you of the issuance of...

384

Better Buildings Neighborhood Program: Energy Upgrade California Drives  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Energy Upgrade Energy Upgrade California Drives Demand From Behind the Wheel to someone by E-mail Share Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Facebook Tweet about Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Twitter Bookmark Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Google Bookmark Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Delicious Rank Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Digg Find More places to share Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on

385

Missouri Water Treatment Plant Upgraded | Department of Energy  

Energy Savers [EERE]

Missouri Water Treatment Plant Upgraded Missouri Water Treatment Plant Upgraded July 13, 2010 - 11:30am Addthis The high service pumps at the St. Peters Water Treatment Plant are...

386

EECBG Success Story: Missouri Water Treatment Plant Upgraded...  

Energy Savers [EERE]

Missouri Water Treatment Plant Upgraded EECBG Success Story: Missouri Water Treatment Plant Upgraded July 13, 2010 - 11:30am Addthis The high service pumps at the St. Peters Water...

387

Bio-oils Upgrading for Second Generation Biofuels  

Science Journals Connector (OSTI)

Bio-oils Upgrading for Second Generation Biofuels ... The present review is then focused on the upgrading possibilities of renewable nonedible feedstocks, obtained from biomass fast pyrolysis or liquefaction, in petroleum refineries, toward the production of second generation biofuels. ...

InÍs GraÁa; Josť M. Lopes; Henrique S. Cerqueira; Maria F. Ribeiro

2012-11-21T23:59:59.000Z

388

Upgrading : an alternative approach towards housing reform in China  

E-Print Network [OSTI]

The thesis is a study on urban housing upgrading in China. The main objective is to look at upgrading, which has been widely used in many developing countries, as an alternative approach to solving the existing urban housing ...

He, Fang, 1956-

1989-01-01T23:59:59.000Z

389

EECBG Success Story: HVAC Upgrade Saving Money, Protecting History...  

Broader source: Energy.gov (indexed) [DOE]

HVAC Upgrade Saving Money, Protecting History EECBG Success Story: HVAC Upgrade Saving Money, Protecting History November 2, 2010 - 5:37pm Addthis A new heating and cooling system...

390

UPGRADE AND EVALUATION OF A LIGHTNING DETECTION SYSTEM  

E-Print Network [OSTI]

/11/2004 page 3 of 17 1 INTRODUCTION KNMI (Royal Netherlands Meteorological Institute) has upgraded itsUPGRADE AND EVALUATION OF A LIGHTNING DETECTION SYSTEM Hans Beekhuis Iwan Holleman the Netherlands

Stoffelen, Ad

391

Director of the Office of Science Homepage | U.S. DOE Office...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Director Home Director of the Office of Science Director Home Organization Chart .pdf file (78KB) Presentations and Testimony History Budget Contact Information Director of the...

392

Steam turbine upgrades: A utility based approach  

SciTech Connect (OSTI)

In the increasingly competitive power generation markets utilities must strive towards lower electricity generation costs, whilst relying on an aging steam turbine fleet. By the year 2000 more than 25% of the global steam turbine capacity will be older than 30 years. The heat rate of such units is generally considerably higher than that of equivalent new plant, and such equipment can be further disadvantaged by increased maintenance costs and forced outage rates. Over the past decade steam turbine conversion, modification, and upgrade packages have become an increasingly important part of the European steam turbine market. Furthermore, many utilities now realize that enhanced cost-effectiveness can often be obtained by moving away from the original equipment manufacturer (OEM), and the upgrading of other manufacturers' plant is now routine within the steam turbine industry. By working closely with customers, GE has developed a comprehensive range of steam turbine upgrade packages, including advanced design steampaths which can increase the performance of existing turbine installations to levels comparable with new plant. Such packages are tailor-made to the requirements of each customer, to ensure that the most cost-effective engineering solution is identified. This paper presents an overview of GE's state-of-the-art steam turbine technology, and continues to describe typical economic models for turbine upgrades.

Wakeley, G.R.

1998-07-01T23:59:59.000Z

393

MAST-Upgrade Advancing compact fusion sources  

E-Print Network [OSTI]

of innovation. It will also put the UK in a leading position to develop engineering systems for the future to the drive towards commercial fusion power. 1. Testing reactor concepts. MAST-Upgrade will be the first machine to include the Super-X divertor design, an innovative plasma exhaust system that, if successful

394

CMS: Present status, limitations, and upgrade plans  

SciTech Connect (OSTI)

An overview of the CMS upgrade plans will be presented. A brief status of the CMS detector will be given, covering some of the issues we have so far experienced. This will be followed by an overview of the various CMS upgrades planned, covering the main motivations for them, and the various R&D efforts for the possibilities under study. The CMS detector has been working extremely well since the start of data-taking at the LHC as is evidenced by the numerous excellent results published by CMS and presented at this workshop and recent conferences. Less well documented are the various issues that have been encountered with the detector. In the spirit of this workshop I will cover some of these issues with particular emphasis on problems that motivate some of the upgrades to the CMS detector for this decade of data-taking. Though the CMS detector has been working extremely well and expectations are great for making the most of the LHC luminosity, there have been a number of issues encountered so far. Some of these have been described and while none currently presents a problem for physics performance, some of them are expected to become more problematic, especially at the highest Phase 1 luminosities for which the majority of the integrated luminosity will be collected. These motivate upgrades for various parts of the CMS detector so that the current excellent physics performance can be maintained or even surpassed in the realm of the highest Phase 1 luminosities.

Cheung, H.W.K.; /Fermilab; ,

2011-09-01T23:59:59.000Z

395

Project Name/Description  

Broader source: Energy.gov (indexed) [DOE]

RCA CM-3 Risk Management RCA CM-3 Risk Management Projects/Programs - RMPs, Tools, and SMEs Project Name/Description (see note below) DOE Program DOE RMP Contractor RMP Combined RMP Tools Database/Risk Analysis SMEs Federal/M&O/Consultant Integrated Biorefinery Research Facility Project EE X Research Support Facility Project EE X National Synchrotron Light Source II Project SC X 12 GeV Upgrade Project (TJL) SC X Physical Sciences Facility Project (PNNL) SC X P6, Pertmaster, Excel Mike Shay, Jason Gatelum ITER SC X (internation al pgm) P6, Pertmaster, Risk Checklist, Risk Assessor Handbook John Tapia, Colin Williams, Allen Bishop SING & SING II (SNS, OR) SC X Excel, Analytic Hierarchy, P6 Barbara Thibadeau Modernization of Lab Fac. (ORNL)

396

NSLS-II Integrated Project Team (IPT)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NSLS-II Integrated Project Team NSLS-II Integrated Project Team DOE uses an integrated project teaming approach for managing the NSLS-II Project. This Integrated Project Team (IPT), organized and led by the NSLS-II Federal Project Director, is an essential element in DOE's acquisition process and is being used during all phases of the project's life cycle. This team consists of professionals representing diverse disciplines with the specific knowledge, skills, and abilities to support the Federal Project Director in successfully executing the project. The IPT for the NSLS-II Project will consist of members from both DOE and the contractor, Brookhaven Science Associates (BSA). The team membership will change as the project progresses from initiation to closeout to ensure the necessary skills are always represented to meet the project's needs.

397

Boiler Upgrades Save Money & Energy: Boeing Philadelphia  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Boeing Philadelphia Boeing Philadelphia The Boeing Company, headquartered in the U.S., is the world's largest aerospace company and is a leading manufacturer of commercial jetliners and defense, space, and security systems. The company controls over 84 million square feet of facilities enterprise-wide and employs over 159,000. Through its partnership with ENERGY STAR, Boeing has refined its corporate-wide energy management program. As a result, Boeing has been able to strengthen energy management across its sites, including the Philadelphia plant where the company produces the H-47 Chinook Helicopter. Increases in production prompted Boeing to undertake a project to upgrade 223,000 square feet of factory. The planned major retrofit afforded the opportunity to look holistically at energy use at the site, and

398

Microsoft Word - Noxon Radio Station Upgrade CX.doc  

Broader source: Energy.gov (indexed) [DOE]

5, 2011 5, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Noxon Radio Station Upgrade Project Budget Information: Work Order # 00254987 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Location: Sanders County, Montana - Section 33, Township 26 North, Range 32 West of the Noxon Rapids Dam Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace the existing building at Noxon Radio Station with a new 650 square foot building. The existing building, especially the floor, is deteriorating

399

Information Technology Letter from the Director  

E-Print Network [OSTI]

Technology Roadmap, ITL is helping to translate mission requirements into technical portability, inInformation Technology Laboratory #12;Letter from the Director I n November 2011, I became the Director of the Information Technology Laboratory (ITL), one of six research laboratories within

400

Planning Organization & Logistics Deputy Director General  

E-Print Network [OSTI]

" Planning Organization & Logistics Deputy Director General Tel: 03 531 8553 : Fax: 03 535 4925 : P-O.Logistics@mail.biu.ac.il Bar-Ilan University, Ramat Gan 52900, Israel · www.6. , . , . #12; " Planning Organization & Logistics Deputy Director General Tel: 03 531 8553 : Fax: 03 535

Adin, Ron

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Program Director Job Requisition 170681  

E-Print Network [OSTI]

-making; and environmental remediation projects. A Taconite Concentrator Modeling and Simulation Center was established, and evaluating innovative approaches to achieving a given simulation objective. Review of complete applications

Netoff, Theoden

402

Renewable Energy & Energy Efficiency Projects: Loan Guarantee Solicitation  

Broader source: Energy.gov [DOE]

Plenary III: Project Finance and Investment Renewable Energy & Energy Efficiency Projects: Loan Guarantee Solicitation Valri Lightner, Assistant Director, Technical Division at Loan Program Office, U.S. Department of Energy

403

A Viewgraph from the Director  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 2 A Viewgraph from the Director ...no one foresaw that the new cores would reveal a climatic flickering of great frequency and magnitude... Art Rosenfeld Global Warming Warning: Don't Fool with the Climate I am pleased to be able to bring you this column for the premier issue of our newsletter because it's an opportunity to present the Center's current favorite viewgraph. I hope that readers who decide the information presented here is useful will pass it along to others. Everything we develop at the Center, from hardware to policy, is aimed at saving energy and money through investments that will pay for themselves in a short time. In a rational market, these ideas sell themselves. But we now know that even before the 1973 oil embargo, when the payback time for

404

Mr. Glen Sjoblom Deputy Director  

Office of Legacy Management (LM)

J-UN 2 0 1590 J-UN 2 0 1590 Mr. Glen Sjoblom Deputy Director Di.vision of Industrial and Medical Nuclear Safety Office of Nuclear Materials Safety and Safeguards. U. S. Nuclear Regulatory C&iitii'&&; Washington, D.C. 20555 Dear Mr. Sjoblom: As a part of its Formerly Utilized Sites Remedial Action Program (FUSRAP), the U. S. Department of Energy (DOE) is trying to identify all sites and facilities where radioactive materials were handled, processed or used in support of Manhattan Engineer. District (MED) and Atomic Energy Commission (AEC) activities from 1942 through the mid-1960's. ,The authority to conduct remed,ial action under FUSRAP, derived from the Atomic Energy Act of 1954, as amended, is limited,to those sites operated prior to the establishment of AEC licensing requirements and at sites that were

405

Mr. Glen Sjoblom Deputy Director  

Office of Legacy Management (LM)

Washington, Df: 20545 Washington, Df: 20545 ,J.LlN 2 0 19% Mr. Glen Sjoblom Deputy Director Division of Industrial and Medical Nuclear Safety Office of Nuclear Materials Safety and Safeguards U. S. Nuclear Regulatory Commission r " Washington, D.C. 20555 Dear Mr. Sjoblom: As a part of its Formerly Utilized Sites Remedial Action Program (FUSRAP), the U. S. Department of Energy (DOE) is trying to identify all sites and facilities where radioactive materials were handled, processed or used in support of Manhattan Engineer District (MED) and Atomic Energy Commission (AEC) activities from 1942 through the mid-1960's. The authority to conduct remedial action under FUSRAP, derived from the Atomic Energy Act of 1954, as amendedi is limited to those sites operated prior to the

406

A Viewgraph from the Director  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 2 A Viewgraph from the Director Art Rosenfeld standing in front of a black board. Art Rosenfeld The Implementation Age: Don't Forget R&D The energy-efficiency community welcomes the federal government's renewed emphasis on implementing new technologies to save energy, money, and the environment. A product of this new direction is the Climate Change Action Plan, which aims to cap U.S. carbon dioxide emissions at 1990 levels by the year 2000. Building energy efficiency will play a major role in the plan in the form of strategies like: Increased government-industry-utility collaboration to produce ''market pull'' programs designed to boost sales of new technologies. Emphasis on retrofitting public buildings for energy efficiency, getting government to practice what it preaches.

407

MEMORANDUM FROM: THOMAS E. BROWN, DIRECTOR OFFICE OF CONTRACT MANAGEMENT  

Broader source: Energy.gov (indexed) [DOE]

,2008 ,2008 MEMORANDUM FROM: THOMAS E. BROWN, DIRECTOR OFFICE OF CONTRACT MANAGEMENT OFFICE OF PROCUREMENT AND ASSISTANCE MANAGEMENT SUBJECT: Contract Change Order Administration of Department of Energy Prime Contracts The purpose of this memorandum is to highlight the need for good contract administration of Department of Energy (DOE) contracts (non management and operating contracts) including those covered by DOE Order 413.3A, Program and Project Management for the Acquisition of Capital Assets. One of the focus areas of the DOE's efforts to improve contract and project management is the recopition that effectrve contract change order administration is critical to ensuring that contract and project requirements are met. Fundamentally, the award of an appropriate contract type that best

408

ANNUAL REVIEW 2012 director's summary  

E-Print Network [OSTI]

designed the drill based on the Danish drill used in Greenland for the NEEM ice coring project. The project authorities, government agencies, industry, and international Antarctic and climate change stakeholders. I am always impressed by the skill and enthusiasm, not to mention the time and energy, our researchers put

409

EMS, FUA and SAD/ASE Checklist for Photon Sources Directorate Reviews  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

January 2, 2009 (Rev. 9) more . . . Page 2 of 7 January 2, 2009 (Rev. 9) more . . . Page 2 of 7 EMS, FUA and SAD/ASE Checklist for Photon Sources Directorate Reviews (Photon Sources Directorate ES&H personnel and the Environmental Compliance Representative can assist in completing this form) Review Committee: Laboratory ESH Committee Date: 08Dec2011 Project Name (and # if any): NSLS-II USI #2 This checklist identifies issues associated with this project that may impact the Directorate Environmental Management System, Occupational Health & Safety Management System, Facility Use Agreements, Safety Assessment Documents & Accelerator Safety Envelopes, and NEPA documents. This checklist will be completed during a review process, if needed, and form part of the documentation of that review.

410

Project 253  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Anna Lee Tonkovich Anna Lee Tonkovich Technical Contact Velocys, Inc. 7950 Corporate Blvd. Plain City, OH 43064 614-733-3330 tonkovich@velocys.com Sequestration UPGRADING METHANE STREAMS WITH ULTRA-FAST TSA Background Most natural gas streams are contaminated with other materials, such as hydrogen sulfide (H 2 S), carbon dioxide (CO 2 ), and nitrogen. Effective processes for removal of H 2 S and CO 2 exist, but because of its relative inertness, nitrogen removal is more difficult and expensive. This project will focus on the separation of nitrogen from methane, which is one of the most significant challenges in recovering low-purity methane streams. The approach is based on applying Velocys' modular microchannel process technology (MPT) to achieve ultra-fast thermal swing adsorption (TSA). MPT

411

Upgrades to meet LANL SF, 121-2011, hazardous waste facility permit requirements  

SciTech Connect (OSTI)

Members of San IIdefonso have requested information from LANL regarding implementation of the revision to LANL's Hazardous Waste Facility Permit (the RCRA Permit). On January 26, 2011, LANL staff from the Waste Disposition Project and the Environmental Protection Division will provide a status update to Pueblo members at the offices of the San IIdefonso Department of Environmental and Cultural Preservation. The Waste Disposition Project presentation will focus on upgrades and improvements to LANL waste management facilities at TA-50 and TA-54. The New Mexico Environment Department issued LANL's revised Hazardous Waste Facility permit on November 30, 2010 with a 30-day implementation period. The Waste Disposition Project manages and operates four of LANL's permitted facilities; the Waste Characterization, Reduction and Repackaging Facility (WCRRF) at TA-SO, and Area G, Area L and the Radioassay and Nondestructive Testing facility (RANT) at TA-54. By implementing a combination of permanent corrective action activities and shorter-term compensatory measures, WDP was able to achieve functional compliance on December 30, 2010 with new Permit requirements at each of our facilities. One component of WOP's mission at LANL is centralized management and disposition of the Laboratory's hazardous and mixed waste. To support this mission objective, WOP has undertaken a project to upgrade our facilities and equipment to achieve fully compliant and efficient waste management operations. Upgrades to processes, equipment and facilities are being designed to provide defense-in-depth beyond the minimum, regulatory requirements where worker safety and protection of the public and the environment are concerned. Upgrades and improvements to enduring waste management facilities and operations are being designed so as not to conflict with future closure activities at Material Disposal Area G and Material Disposal Area L.

French, Sean B [Los Alamos National Laboratory; Johns - Hughes, Kathryn W [Los Alamos National Laboratory

2011-01-21T23:59:59.000Z

412

Statement from Ward Sproat on Yucca Mountain, Director of the...  

Energy Savers [EERE]

Ward Sproat on Yucca Mountain, Director of the Office of Civilian Radioactive Waste Management Statement from Ward Sproat on Yucca Mountain, Director of the Office of Civilian...

413

DOE Head Contracting Authority (HCA) and Procurement Director...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

DOE Head Contracting Authority (HCA) and Procurement Director (PD) Directory DOE Head Contracting Authority (HCA) and Procurement Director (PD) Directory HCA and PD List Sept 23...

414

TO: Procurement Directors Head of Contracting Activities FROM...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

8 DATE: December 5, 2014 TO: Procurement Directors Head of Contracting Activities FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of...

415

TO: Procurement Directors Head of Contracting Activities FROM...  

Broader source: Energy.gov (indexed) [DOE]

9 DATE: August 21, 2014 TO: Procurement Directors Head of Contracting Activities FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of...

416

Campus Public Safety Office Michael Soto, Director of Public Safety  

E-Print Network [OSTI]

Campus Public Safety Office Michael Soto, Director of Public Safety Service Resource, teaching, research and service. Michael D. Soto Director of Public Safety Public Safety Office Service

Bertini, Robert L.

417

Lorrie A. Johnson, Acting Associate Director | OSTI, US Dept...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lorrie A. Johnson, Acting Associate Director Lorrie Apple Johnson currently serves as Acting Associate Director for Administrative and Information Services, overseeing a range of...

418

Paul Langan to lead ORNL's Neutron Sciences Directorate | ornl...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bill Cabage Communications 865.574.4399 Paul Langan to lead ORNL's Neutron Sciences Directorate Paul Langan has been named ORNL's Associate Lab Director for Neutron Sciences. Paul...

419

Richard Lazarus Named as Executive Director of National Commission...  

Energy Savers [EERE]

Lazarus Named as Executive Director of National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling Richard Lazarus Named as Executive Director of National...

420

ATU Advanced Technology Upgrading Ltd | Open Energy Information  

Open Energy Info (EERE)

ATU Advanced Technology Upgrading Ltd ATU Advanced Technology Upgrading Ltd Jump to: navigation, search Name ATU (Advanced Technology Upgrading) Ltd Place Israel Product Focused on development of rechargeable magnesium battery. References ATU (Advanced Technology Upgrading) Ltd[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. ATU (Advanced Technology Upgrading) Ltd is a company located in Israel . References ‚ÜĎ "ATU (Advanced Technology Upgrading) Ltd" Retrieved from "http://en.openei.org/w/index.php?title=ATU_Advanced_Technology_Upgrading_Ltd&oldid=342420" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes Special pages Printable version

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Project: BELLA Bldg. #: 71  

E-Print Network [OSTI]

Upgrades (UPS) B. B75/B36 HPW Replacement C. B90 Repair Buttress Support Affected Area Dates Project/15/2011 Mc Millan Rd. (11) 10 8/1/2011 10/15/2011 Lot Q (116) 4 8/1/2011 10/15/2011 C B90 Repair Buttress Seismic Phase II B74 B B75 HPW Pipeline B75/B76 SERC TBD 9 CRT TBD 5 BELLA B71 6 #12;

422

Heavy oil upgrading. Semi annual report {number_sign}2, April 1--September 30, 1996  

SciTech Connect (OSTI)

For the period April 1 to September 30, 1996, research efforts were focused on the synthesis and characterization of large quantities of Metal Substituted Aluminophosphate Molecular Sieves Catalysts of type 36 structure (MeAPO-36) for use in the upgrading of petroleum residuum. So far the authors have succeeded in synthesizing catalysts samples containing magnesium, zinc, cobalt and manganese in the frameworks of the respective molecular sieve. Preliminary characterization studies done by Infrared Spectroscopy demonstrated that these materials contains the Bronsted acid sites that they proposed will be active centers in the Mild Hydrocracking Process. Recently, a range of interesting aluminosilicates mesoporous materials was synthesized by Mobil R and D. These materials, known as MCM-41 type materials, contain ultra large pore unidimensional channels ranging from 20 angstrom to 100 angstrom and therefore have tremendous potential for Resid upgrading since their acid strengths are milder than zeolite. To broaden the scope of the project, MCM 41 was synthesized in the laboratory according to published procedures and the structure was confirmed by XRD. In addition, an ultra large pore high silica zeolite, UTD-1, containing a 14 angstrom tetrahedral atom pore opening was recently synthesized by Researchers at Texas A and M University. Like MCM-41, this material also has tremendous potential for Resid Upgrading since the pores are capable of accommodating larger organic molecules. The authors are currently characterizing samples of this zeolite that they intend to use in conjunction with the MeAPOs to form composite catalysts for use in resid upgrading.

NONE

1996-12-31T23:59:59.000Z

423

ATLAS Upgrades Towards the High Luminosity LHC: extending the discovery potential  

E-Print Network [OSTI]

After successful LHC operation at the center-of-mass energy of 7 and 8 TeV in 2011 and 2012, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the data set from about few hundred fb-1 expected for LHC running to 3000 fb-1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon systems, as well as improved triggers and data acqui...

Cinca, D; The ATLAS collaboration

2014-01-01T23:59:59.000Z

424

Project Title: Translating Solanaceae Sequence Diversity and Trait Variation into Applied Outcomes through Integrative Research, Education, and Extension  

E-Print Network [OSTI]

Project Title: Translating Solanaceae Sequence Diversity and Trait Variation into Applied Outcomes. Project Director: David Douches (douchesd@msu.edu), Michigan State University Co-Directors: Robin Buell@hort.oregonstate.edu), Oregon State University Project Website: http://solcap.msu.edu The SolCAP project was initiated September

Douches, David S.

425

An Upgrade Proposal from the PHENIX Collaboration  

E-Print Network [OSTI]

In this document the PHENIX collaboration proposes a major upgrade to the PHENIX detector at the Relativistic Heavy Ion Collider. This upgrade, sPHENIX, enables an extremely rich jet and beauty quarkonia physics program addressing fundamental questions about the nature of the strongly coupled quark-gluon plasma (QGP), discovered experimentally at RHIC to be a perfect fluid. The startling dynamics of the QGP on fluid-like length scales is an emergent property of quantum chromodynamics (QCD), seemingly implicit in the Lagrangian but stubbornly hidden from view. QCD is an asymptotically free theory, but how QCD manifests as a strongly coupled fluid with specific shear viscosity near $T_C$, as low as allowed by the uncertainty principle, is as fundamental an issue as that of how confinement itself arises.

Adare, A; Aidala, C; Ajitanand, N N; Akiba, Y; Akimoto, R; Alexander, J; Aoki, K; Apadula, N; Asano, H; Atomssa, E T; Awes, T C; Azmoun, B; Babintsev, V; Bai, M; Bai, X; Bandara, N; Bannier, B; Barish, K N; Baron, O; Bassalleck, B; Bathe, S; Baublis, V; Baumgart, S; Bazilevsky, A; Beaumier, M; Beckman, S; Belmont, R; Benjamin, G; Berdnikov, A; Berdnikov, Y; Blackburn, J; Blau, D S; Bobrek, M; Bok, J; Boose, S; Boyle, K; Britton,, C L; Brooks, M L; Bryslawskyj, J; Bumazhnov, V; Butler, C; Butsyk, S; Campbell, S; Carollo, A; Chai, J -S; Chen, C -H; Chernichenko, S; Chi, C Y; Chiu, M; Choi, I J; Choi, J B; Choi, S; Chollet, S; Christiansen, P; Chujo, T; Cianciolo, V; Citron, Z; Cole, B A; Cronin, N; Crossett, N; CsanŠd, M; D'Orazio, L; Dairaku, S; Danley, D; Datta, A; Daugherity, M S; David, G; DeBlasio, K; Debraine, A; Dehmelt, K; Denisov, A; Deshpande, A; Desmond, E J; Dietzsch, O; Ding, L; Dion, A; Diss, P B; Do, J H; Donadelli, M; Drapier, O; Drees, A; Drees, K A; Durham, J M; Durum, A; Eberle, L; Efremenko, Y V; Engelmore, T; Enokizono, A; Esumi, S; Eyser, K O; Fadem, B; Feege, N; Fields, D E; Finger, M; FingerJr., M; Fleuret, F; Fokin, S L; Frantz, J E; Franz, A; Frawley, A D; Fukao, Y; Fusayasu, T; Gainey, K; Gal, C; Gallus, P; Garg, P; Garishvili, A; Garishvili, I; Gastaldi, F; Ge, H; Giannotti, P; Giordarno, F; Glenn, A; Gong, X; Gonin, M; Goto, Y; de Cassagnac, R Granier; Grau, N; Greene, S V; Perdekamp, M Grosse; Gu, Y; Gunji, T; Guragain, H; Hachiya, T; Haggerty, J S; Hahn, K I; Hamagaki, H; Hamilton, H F; Han, S Y; Hanks, J; Hasegawa, S; Haseler, T O S; Hashimoto, K; Hayano, R; Hayashi, S; He, X; Hemmick, T K; Hester, T; Hill, J C; Hoefferkamp, M; Hollis, R S; Homma, K; Hong, B; Hori, Y; Hoshino, T; Huang, J; Huang, S; Hutchins, J R; Ichihara, T; Ikeda, Y; Imai, K; Imazu, Y; Imrek, J; Inaba, M; Iordanova, A; Isenhower, D; Isinhue, A; Isupov, A; Ivanischev, D; Ivanov, V; Jacak, B V; Jeon, S J; Jezghani, M; Jia, J; Jiang, X; Johnson, B M; Joo, K S; Jouan, D; Jumper, D S; Kamin, J; Kanda, S; Kang, B H; Kang, J H; Kang, J S; Kapustinsky, J; Karatsu, K; Kawall, D; Kazantsev, A V; Kehayias, H -J; Key, J A; Khachatryan, V; Khandai, P K; Khanzadeev, A; Kijima, K M; Kim, C; Kim, D H; Kim, D J; Kim, E -J; Kim, H J; Kim, K -B; Kim, M; Kim, Y -J; Kim, Y K; Kimelman, B; Kiss, Ń; Kistenev, E; Kitamura, R; Klatsky, J; Kleinjan, D; Kline, P; Koblesky, T; Kochenda, L; Kofarago, M; Komatsu, Y; Komkov, B; Koster, J; Kotchetkov, D; Kotov, D; Kravtsov, P; Krizek, F; Kurita, K; Kuriyama, M; Kurosawa, M; Kwon, Y; Lacey, R; Lai, Y S; Lajoie, J G; Lebedev, A; Lee, G H; Lee, J; Lee, K B; Lee, K S; Lee, S; Lee, S H; Lefferts, R; Leitch, M J; Leite, M A L; Leitgab, M; Lewis, B; Li, X; Lim, S H; Lipski, A; Litvinenko, A; Liu, M X; Love, B; Lynch, D; Lynch, M; Maguire, C F; Makdisi, Y I; Makek, M; Malakhov, A; Manion, A; Manko, V I; Mannel, E; Maruyama, T; Masumoto, S; McCumber, M; McGaughey, P L; McGlinchey, D; McKay, R; McKinney, C; Meles, A; Mendoza, M; Menegasso, R; Meredith, B; Miake, Y; Mibe, T; Mignerey, A C; Milov, A; Mishra, D K; Mitchell, J T; Miyasaka, S; Mizuno, S; Mohanty, A K; Montuenga, P; Moon, T; Morrison, D P; Moskowitz, M; Motschwiller, S; Moukhanova, T V; Murakami, T; Murata, J; Mwai, A; Nagae, T; Nagamiya, S; Nagashima, K; Nagle, J L; Nagy, M I; Nakagawa, I; Nakagomi, H; Nakamiya, Y; Nakamura, K R; Nakamura, T; Nakano, K; Nattrass, C; Nederlof, A; Netrakanti, P K; Nihashi, M; Niida, T; Ninomiya, K; Nishimura, S; Northacker, D; Nouicer, R; Novak, T; Novitzky, N; Nukariya, A; Nyanin, A S; O'Brien, E; Ogilvie, C A; Oide, H; Okada, K; Koop, J D Orjuela; Osborn, J D; Oskarsson, A; ÷sterman, L; Ozawa, K; Pancake, C; Pantuev, V; Papavassiliou, V; Park, I H; Park, J S; Park, S; Park, S K; Pate, S F; Patel, L; Patel, M; Peng, J -C; Perepelitsa, D; Perera, G D N; Peresedov, V; Peressounko, D Yu; Perry, J; Petti, R; Pinkenburg, C; Pinson, R; Pisani, R P; Popule, J; Purschke, M L; Qu, H; Radhakrishnan, S; Rak, J; Ramson, B J; Ravinovich, I; Read, K F; Reynolds, D; Reynolds, R; Riabov, V; Riabov, Y; Richardson, E; Rinn, T; Riveli, N; Roach, D; Rolnick, S D; Rosati, M; Roschin, E; Rowan, Z; Rubin, J G; Rukoyatkin, P; Ryu, M S; Safonov, A; Sahlmueller, B; Saito, N; Sakaguchi, T; Sako, H; Samsonov, V; Sano, M; Sarsour, M; Sato, S; Sawada, S; Schaefer, B; Schmoll, B K; Sedgwick, K; Seele, J; Seidl, R; Sekiguchi, Y; Sen, A; Seto, R; Sett, P; Sexton, A; Shafto, E; Sharma, D; Shaver, A; Shein, I; Shibata, T -A; Shigaki, K; Shimomura, M; Shoji, K; Shukla, P; Sicho, P; Sickles, A; Silva, C L; Silvermyr, D; Singh, B K; Singh, C P; Singh, V; Sippach, F W; Skolnik, M; Snowball, M; Solano, S; Soldatov, A; Soltz, R A; Sondheim, W E; Sorensen, S P; Soumya, M; Sourikova, I V; Stankus, P W; Steinberg, P; Stenlund, E; Stepanov, M; Ster, A; Stevens, L; Stoll, S P; Stone, M R; Sugitate, T; Sukhanov, A; Sumita, T; Sun, J; Sziklai, J; Takagui, E M

2015-01-01T23:59:59.000Z

426

CHALLENGES FOR THE SNS RING ENERGY UPGRADE  

SciTech Connect (OSTI)

The Oak Ridge Spallation Neutron Source accumulator ring presently operates at a beam power of about 1 MW with a beam energy of about 910 MeV. A power upgrade is planned to increase the beam energy to 1.3 GeV. For the accumulator ring this mostly involves modifications to the injection and extraction sections. A variety of modifications to the existing injection section were necessary to achieve 1 MW, and the tools developed and the lessons learned from this work are now being applied to the design of the new injection section. This paper will discuss the tools and the lessons learned, and also present the design and status of the upgrades to the accumulator ring.

Plum, Michael A [ORNL; Gorlov, Timofey V [ORNL; Holmes, Jeffrey A [ORNL; Hunter, W Ted [ORNL; Roseberry, Jr., R Tom [ORNL; Wang, Jian-Guang [ORNL

2012-01-01T23:59:59.000Z

427

An Upgrade Proposal from the PHENIX Collaboration  

E-Print Network [OSTI]

In this document the PHENIX collaboration proposes a major upgrade to the PHENIX detector at the Relativistic Heavy Ion Collider. This upgrade, sPHENIX, enables an extremely rich jet and beauty quarkonia physics program addressing fundamental questions about the nature of the strongly coupled quark-gluon plasma (QGP), discovered experimentally at RHIC to be a perfect fluid. The startling dynamics of the QGP on fluid-like length scales is an emergent property of quantum chromodynamics (QCD), seemingly implicit in the Lagrangian but stubbornly hidden from view. QCD is an asymptotically free theory, but how QCD manifests as a strongly coupled fluid with specific shear viscosity near $T_C$, as low as allowed by the uncertainty principle, is as fundamental an issue as that of how confinement itself arises.

A. Adare; S. Afanasiev; C. Aidala; N. N. Ajitanand; Y. Akiba; R. Akimoto; J. Alexander; K. Aoki; N. Apadula; H. Asano; E. T. Atomssa; T. C. Awes; B. Azmoun; V. Babintsev; M. Bai; X. Bai; N. Bandara; B. Bannier; K. N. Barish; O. Baron; B. Bassalleck; S. Bathe; V. Baublis; S. Baumgart; A. Bazilevsky; M. Beaumier; S. Beckman; R. Belmont; G. Benjamin; A. Berdnikov; Y. Berdnikov; J. Blackburn; D. S. Blau; M. Bobrek; J. Bok; S. Boose; K. Boyle; C. L. Britton, Jr.; M. L. Brooks; J. Bryslawskyj; V. Bumazhnov; C. Butler; S. Butsyk; S. Campbell; A. Carollo; J. -S. Chai; C. -H. Chen; S. Chernichenko; C. Y. Chi; M. Chiu; I. J. Choi; J. B. Choi; S. Choi; S. Chollet; P. Christiansen; T. Chujo; V. Cianciolo; Z. Citron; B. A. Cole; N. Cronin; N. Crossett; M. CsanŠd; L. D'Orazio; S. Dairaku; D. Danley; A. Datta; M. S. Daugherity; G. David; K. DeBlasio; A. Debraine; K. Dehmelt; A. Denisov; A. Deshpande; E. J. Desmond; O. Dietzsch; L. Ding; A. Dion; P. B. Diss; J. H. Do; M. Donadelli; O. Drapier; A. Drees; K. A. Drees; J. M. Durham; A. Durum; L. Eberle; Y. V. Efremenko; T. Engelmore; A. Enokizono; S. Esumi; K. O. Eyser; B. Fadem; N. Feege; D. E. Fields; M. Finger; M. FingerJr.; F. Fleuret; S. L. Fokin; J. E. Frantz; A. Franz; A. D. Frawley; Y. Fukao; T. Fusayasu; K. Gainey; C. Gal; P. Gallus; P. Garg; A. Garishvili; I. Garishvili; F. Gastaldi; H. Ge; P. Giannotti; F. Giordarno; A. Glenn; X. Gong; M. Gonin; Y. Goto; R. Granier de Cassagnac; N. Grau; S. V. Greene; M. Grosse Perdekamp; Y. Gu; T. Gunji; H. Guragain; T. Hachiya; J. S. Haggerty; K. I. Hahn; H. Hamagaki; H. F. Hamilton; S. Y. Han; J. Hanks; S. Hasegawa; T. O. S. Haseler; K. Hashimoto; R. Hayano; S. Hayashi; X. He; T. K. Hemmick; T. Hester; J. C. Hill; M. Hoefferkamp; R. S. Hollis; K. Homma; B. Hong; Y. Hori; T. Hoshino; J. Huang; S. Huang; J. R. Hutchins; T. Ichihara; Y. Ikeda; K. Imai; Y. Imazu; J. Imrek; M. Inaba; A. Iordanova; D. Isenhower; A. Isinhue; A. Isupov; D. Ivanischev; V. Ivanov; B. V. Jacak; S. J. Jeon; M. Jezghani; J. Jia; X. Jiang; B. M. Johnson; K. S. Joo; D. Jouan; D. S. Jumper; J. Kamin; S. Kanda; B. H. Kang; J. H. Kang; J. S. Kang; J. Kapustinsky; K. Karatsu; D. Kawall; A. V. Kazantsev; H. -J. Kehayias; J. A. Key; V. Khachatryan; P. K. Khandai; A. Khanzadeev; K. M. Kijima; C. Kim; D. H. Kim; D. J. Kim; E. -J. Kim; H. J. Kim; K. -B. Kim; M. Kim; Y. -J. Kim; Y. K. Kim; B. Kimelman; Ń. Kiss; E. Kistenev; R. Kitamura; J. Klatsky; D. Kleinjan; P. Kline; T. Koblesky; L. Kochenda; M. Kofarago; Y. Komatsu; B. Komkov; J. Koster; D. Kotchetkov; D. Kotov; P. Kravtsov; F. Krizek; K. Kurita; M. Kuriyama; M. Kurosawa; Y. Kwon; R. Lacey; Y. S. Lai; J. G. Lajoie; A. Lebedev; G. H. Lee; J. Lee; K. B. Lee; K. S. Lee; S. Lee; S. H. Lee; R. Lefferts; M. J. Leitch; M. A. L. Leite; M. Leitgab; B. Lewis; X. Li; S. H. Lim; A. Lipski; A. Litvinenko; M. X. Liu; B. Love; D. Lynch; M. Lynch; C. F. Maguire; Y. I. Makdisi; M. Makek; A. Malakhov; A. Manion; V. I. Manko; E. Mannel; T. Maruyama; S. Masumoto; M. McCumber; P. L. McGaughey; D. McGlinchey; R. McKay; C. McKinney; A. Meles; M. Mendoza; R. Menegasso; B. Meredith; Y. Miake; T. Mibe; A. C. Mignerey; A. Milov; D. K. Mishra; J. T. Mitchell; S. Miyasaka; S. Mizuno; A. K. Mohanty; P. Montuenga; T. Moon; D. P. Morrison; M. Moskowitz; S. Motschwiller; T. V. Moukhanova; T. Murakami; J. Murata; A. Mwai; T. Nagae; S. Nagamiya; K. Nagashima; J. L. Nagle; M. I. Nagy; I. Nakagawa; H. Nakagomi; Y. Nakamiya; K. R. Nakamura; T. Nakamura; K. Nakano; C. Nattrass; A. Nederlof; P. K. Netrakanti; M. Nihashi; T. Niida; K. Ninomiya; S. Nishimura; D. Northacker; R. Nouicer; T. Novak; N. Novitzky; A. Nukariya; A. S. Nyanin; E. O'Brien; C. A. Ogilvie; H. Oide; K. Okada; J. D. Orjuela Koop; J. D. Osborn; A. Oskarsson; L. ÷sterman; K. Ozawa; C. Pancake; V. Pantuev; V. Papavassiliou; I. H. Park; J. S. Park; S. Park; S. K. Park; S. F. Pate; L. Patel; M. Patel; J. -C. Peng; D. Perepelitsa; G. D. N. Perera; V. Peresedov; D. Yu. Peressounko; J. Perry; R. Petti; C. Pinkenburg; R. Pinson; R. P. Pisani; J. Popule; M. L. Purschke; H. Qu; S. Radhakrishnan; J. Rak; B. J. Ramson; I. Ravinovich; K. F. Read; D. Reynolds; R. Reynolds; V. Riabov; Y. Riabov; E. Richardson; T. Rinn; N. Riveli; D. Roach; S. D. Rolnick; M. Rosati; E. Roschin; Z. Rowan; J. G. Rubin; P. Rukoyatkin; M. S. Ryu; A. Safonov; B. Sahlmueller; N. Saito; T. Sakaguchi; H. Sako; V. Samsonov; M. Sano; M. Sarsour; S. Sato; S. Sawada; B. Schaefer; B. K. Schmoll; K. Sedgwick; J. Seele; R. Seidl; Y. Sekiguchi; A. Sen; R. Seto; P. Sett; A. Sexton; E. Shafto; D. Sharma; A. Shaver; I. Shein; T. -A. Shibata; K. Shigaki; M. Shimomura; K. Shoji; P. Shukla; P. Sicho; A. Sickles; C. L. Silva; D. Silvermyr; B. K. Singh; C. P. Singh; V. Singh; F. W. Sippach; M. Skolnik; M. Snowball; S. Solano; A. Soldatov; R. A. Soltz; W. E. Sondheim; S. P. Sorensen; M. Soumya; I. V. Sourikova; P. W. Stankus

2015-01-25T23:59:59.000Z

428

Argonne National Laboratory Director's Postdoctoral Fellowship Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Director's Postdoctoral Fellowship Program Director's Postdoctoral Fellowship Program Instructions for Applicants Candidates for the Director's Postdoctoral Fellowships are selected based on their research and academic accomplishments, and the strength of their research proposal. They will collaborate with Argonne scientists and engineers on existing programs and on new initiatives. All applicants must identify an Argonne employee (sponsor) who will write the nomination memo and present your case in front of the Postdoctoral Committee. The sponsor could be someone who is already familiar with your research work and accomplishments through previous collaborations or professional societies. If you have not yet identified an Argonne sponsor, visit the detailed websites of the various Research

429

Upgrades to Monteburns, version 3.0  

SciTech Connect (OSTI)

Monteburns, a Monte Carlo burnup code which has the flexibility to model time-dependent isotopic changes for a variety of nuclear systems by linking the neutron transport code MCNP/X to a production/depletion code, has undergone several performance upgrades recently that have increased the code's capabilities. Once limited to a specific number of regions, enhancements have been implemented that afford a much greater number of burn materials, such that users will be more limited by the physical constraints of their computing environment as opposed to inherent limits built into the coding of Monteburns. In conjunction with the increase in the number of burn materials, parallel execution of a production/depletion code of choice has been implemented, such that users have the option of using CINDER90, 0RIGEN2, or the newly released version of ORIGEN. Finally, the recoverable energy per fission calculation was upgraded to include capture gamma energy deposited in all specified materials as a function of irradiation time. The sum of the prompt and delayed recoverable energies from fission was obtained as before. These upgrades were first tested on a rigorous 1/8 core model of a Pressurized Water Reactor with fresh, once- and twice-burned fuel. We can now model several orders of magnitude more materials using Monte Carlo techniques, which is a significant advance in the reactor modeling world. (authors)

Galloway, J. D.; Trellue, H. R. [Los Alamos National Laboratory, 30 Bikini Atoll Rd., Los Alamos, NM 87545-0001 (United States)

2012-07-01T23:59:59.000Z

430

Page 1 of 6 Senior Honors Project  

E-Print Network [OSTI]

Page 1 of 6 Senior Honors Project Begin thinking about a topic. Gather your thoughts about what ideas. Review examples of past Senior Honors Projects in your field by consulting with an Honors Adviser. Find a Faculty Director to supervise your project. After you have a sense of what you would like to do

Saidak, Filip

431

Project team : Daylighting The New York Times Building  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project team Project team Overview The architectural approach The owner's approach Daylighting field study Daylighting control systems Automated roller shades Procurement specifications Shades and Shade Controls Lighting Controls Visualizing daylight Commissioning/ verification Demand response Mainstream solutions Post-occupancy evaluation Publications Sponsors Project team Project team To contact the following individuals, please call the number listed or enable JavaScript within your browser's preferences. The New York Times Company Angelo Salvatore Executive Director of Building Operations Patrick Whelan Facilities Director Glenn Hughes Director of Construction/ Real Estate David Thurm Chief Information Officer Hussain Ali-Khan Vice President, Real Estate Development

432

Mr. Frank Russo, Project Director Bechtel National, Inc. 2435...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

pipejoggles were consistent with weekly schedule goals. HLW is almost bought out on bulk materials, freeing up money for other priorities. " BNI held vendors accountable by...

433

Project Title: Complete System-Level Efficient and Interoperable...  

Office of Environmental Management (EM)

and architecture since a microgrid will be likely upgraded from an existing system. 2014 Smart Grid R&D Program Peer Review Project Summary 2 2014 Smart Grid R&D Program Peer...

434

Guidelines for Home Energy Professionals Project Fact Sheet ...  

Energy Savers [EERE]

Home Energy Professionals Project Fact Sheet The U.S. Department of Energy and the home energy upgrade industry collaborate to define high-quality work and develop highly...

435

Proposed Project: Plains & Eastern Clean Line | Department of...  

Broader source: Energy.gov (indexed) [DOE]

published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act (EPAct) of 2005. In...

436

NREL: Research Participant Program - Director's Fellowship  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Director's Fellowship Director's Fellowship View NREL's Research Participant Program Video on YouTube. The NREL Director's Fellowships are designed to attract the next generation of exceptionally qualified scientists and engineers with outstanding talent and credentials in renewable energy research and related disciplines. Candidates must be a recent PhD graduate (within two years of completion), and demonstrate a promising career of leadership and research. Candidates will be selected based on eligibility, program expectations, and research proposals. Overriding consideration, when evaluating the application, will be the quality of the candidate. Successful candidates will serve a two-year term, with a possible third year renewal paid with program funding (maximum three year-appointments). The Director's

437

February 25, 2014 POSITION TITLE: Community Director  

E-Print Network [OSTI]

; regulating safety operations; performing collateral tasks including staff selection, training and developmentFebruary 25, 2014 POSITION TITLE: Community Director PERSONNEL STATUS: Exempt, Full-Time, Regular the management and administration of daily residential community operations; providing crisis response; serving

Maryland, Baltimore County, University of

438

Director Position Center for Urban Transportation  

E-Print Network [OSTI]

Director Position Center for Urban Transportation The Center for Urban Transportation Research for state policymakers, transportation agencies, transportation professionals and the public. CUTR conducts of Transportation's Federal Transit Administration and Federal Highway Administration, the Florida Department

Arslan, H√ľseyin

439

Supervisory Physical Scientist (Safety Programs Division Director)  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as the Director of the Safety Programs Division in the Office of Operations Oversight responsible for providing internal and independent oversight...

440

June 29, 2006 Timothy H. Johnson, Director  

E-Print Network [OSTI]

June 29, 2006 Timothy H. Johnson, Director Department of Administrative Services County of Allegheny, Pennsylvania Dear Mr. Johnson, I am in receipt of your letter of June 15th and as a result am

Eckhardt, Dave

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

August 10, 2006 Timothy H. Johnson, Director  

E-Print Network [OSTI]

August 10, 2006 Timothy H. Johnson, Director Department of Administrative Services County of Allegheny, Pennsylvania Dear Mr. Johnson, I appreciate the time you spent on the phone with me yesterday

Eckhardt, Dave

442

Director, Division of Economic and Technical Analysis  

Broader source: Energy.gov [DOE]

The Commission is seeking a highly qualified individual to provide leadership as the Director, Division of Economic and Technical Analysis within the Office of Energy Policy and Innovation. In this...

443

Director, Human Resources Shared Service Center  

Broader source: Energy.gov [DOE]

The Department of Energy is looking for an energetic, innovative executive who will enjoy working in a dynamic and mission driven organization as the Director, Human Resources Shared Service Center...

444

Responsible University Officials: Director of Purchasing  

E-Print Network [OSTI]

Responsible University Officials: Director of Purchasing Controller Responsible Offices: Purchasing Resource Services Controller's Office Origination Date: December 1, 2008 Purchasing Policy - Quick Reference Guide The entire Purchasing Policy and Procedures document is available on the NU Portal

Kuzmanovic, Aleksandar

445

Materials Science and Technology Division - Physical Sciences Directorate -  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ABD ABD For the Public Visiting ORNL For Researchers Profiles Group Leader Staff Members Facilities For Industry Research Projects Our People Group Leader, Staff Members, Facilities Find People Energy Frontier Research Center Center for Defect Physics (EFRC) User Facilities High Temperature Materials Laboratory (HTML) Shared Research Equipment User Facility (ShaRE) Related User Facilities Center for Nanophase Materials Sciences (CNMS) High Flux Isotope Reactor (HFIR) Spallation Neutron Source (SNS) Seminars and Announcements MSTD Internal Recent News & Features News Releases Archive | Features Archive PSD Directorate ‚Äļ MST Division ‚Äļ Alloy Behavior and Design Group The principal technical contact for discussing potential projects in the Alloy Behavior and Design Group is Dr. Easo P. George, Group Leader.

446

Director's Discretionary Research and Development Program, Annual Report FY 2007  

Office of Energy Efficiency and Renewable Energy (EERE)

Director's Discretionary Research and Development Program, Annual Report FY 2007 May 2007 Final Draft.

447

Project 350  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Gas Hydrates Gas Hydrates CONTACTS Ray Boswell Acting Technology Manager Gas Technology Management Division 304-285-4541 ray.boswell@netl.doe.gov James Ammer Director Gas Technology Management Division 304-285-4383 james.ammer@netl.doe.gov Kelly Rose Project Manager Gas Technology Management Division 304-285-4157 kelly.rose@netl.doe.gov Joseph Wilder Research Group Leader Simulation, Analysis and Computational Science Division 304-285-0989 joseph.wilder@netl.doe.gov NETL - DIRECTING THE DEVELOPMENT OF WORLD-CLASS GAS HYDRATE RESERVOIR SIMULATORS Development of reliable simulators that accurately predict the behavior methane hydrates in nature is a critical component of NETL's program to appraise the gas supply potential of hydrates. NETL is leading the development of a suite of modeling tools that are providing

448

Project 278  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Karen Cohen Karen Cohen Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-6667 karen.cohen@netl.doe.gov Ken Nemeth Executive Director Southern States Energy Board 6325 Amherst Court Norcross, GA 30092 770-242-7712 nemeth@sseb.org Sequestration SOUTHEAST REGIONAL CARBON SEQUESTRATION PARTNERSHIP (SECARB) Background The U.S. Department of Energy has selected the seven partnerships of state agencies, universities, and private companies that will form the core of a nationwide network that will help determine the best approaches for capturing and permanently storing gases that can contribute to global climate change. All together, the partnerships include more than 240 organizations, spanning 40 states, three Indian nations, and

449

County Aims to Save with Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

County Aims to Save with Upgrades County Aims to Save with Upgrades County Aims to Save with Upgrades August 5, 2010 - 6:50pm Addthis Paul Lester Communications Specialist, Office of Energy Efficiency and Renewable Energy Fulton County, Georgia is an example of how large-scale energy upgrades can save local governments millions of dollars and develop a new green workforce. A retrofit program, funded by an $814,300 Energy Efficiency and Conservation Block Grant (EECBG) through the American Recovery and Reinvestment Act, was the topic of a recent video. Under the program, more than a dozen county facilities are being upgraded with equipment such as occupancy sensors, digital thermostats and LED exit signs. County workers will also be trained on how to conduct the upgrades and keep buildings energy efficient.

450

Energy Efficiency Upgrades: Benefiting Homeowners and the Environment |  

Broader source: Energy.gov (indexed) [DOE]

Upgrades: Benefiting Homeowners and the Upgrades: Benefiting Homeowners and the Environment Energy Efficiency Upgrades: Benefiting Homeowners and the Environment May 10, 2013 - 4:37pm Addthis Energy efficient upgrades helped Margie Garmey save money while reducing her impact on the planet. | Photo courtesy of Margie Garmey. Energy efficient upgrades helped Margie Garmey save money while reducing her impact on the planet. | Photo courtesy of Margie Garmey. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs Looking for ways to save energy? Learn how to do a DIY home energy audit to help you identify and prioritize some energy efficiency upgrades. Check out Energy Saver for tips and advice on ways to save energy and money. When Margie Garmey and her partner bought their newly constructed two-story

451

County Aims to Save with Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Aims to Save with Upgrades Aims to Save with Upgrades County Aims to Save with Upgrades August 5, 2010 - 6:50pm Addthis Paul Lester Communications Specialist, Office of Energy Efficiency and Renewable Energy Fulton County, Georgia is an example of how large-scale energy upgrades can save local governments millions of dollars and develop a new green workforce. A retrofit program, funded by an $814,300 Energy Efficiency and Conservation Block Grant (EECBG) through the American Recovery and Reinvestment Act, was the topic of a recent video. Under the program, more than a dozen county facilities are being upgraded with equipment such as occupancy sensors, digital thermostats and LED exit signs. County workers will also be trained on how to conduct the upgrades and keep buildings energy efficient.

452

Methods and apparatuses for preparing upgraded pyrolysis oil  

DOE Patents [OSTI]

Methods and apparatuses for preparing upgraded pyrolysis oil are provided herein. In an embodiment, a method of preparing upgraded pyrolysis oil includes providing a biomass-derived pyrolysis oil stream having an original oxygen content. The biomass-derived pyrolysis oil stream is hydrodeoxygenated under catalysis in the presence of hydrogen to form a hydrodeoxygenated pyrolysis oil stream comprising a cyclic paraffin component. At least a portion of the hydrodeoxygenated pyrolysis oil stream is dehydrogenated under catalysis to form the upgraded pyrolysis oil.

Brandvold, Timothy A; Baird, Lance Awender; Frey, Stanley Joseph

2013-10-01T23:59:59.000Z

453

Thermal performance upgrade of the Arkansas Nuclear One cooling tower: A ``root cause`` analysis approach  

SciTech Connect (OSTI)

The thermal performance efficiency of the natural draft cooling tower at Entergy Operations` 858 MWe Arkansas Nuclear One, Unit 2 was successfully upgraded to 101% of design performance capability in April 1994 as the end result of a unique root-cause analysis of the cooling tower`s long-standing performance deficiencies. Through application of state-of-the-art diagnostic testing methods and computer modeling techniques, Entergy was able to identify and correct air/water maldistribution problems in the 447 foot tall counterflow cooling tower at minimal cost. Entergy estimates that the savings realized, as a result of the 1.2 F reduction in cooling tower outlet water temperature, will pay for the thermal upgrade project in approximately 14 months.

Liffick, G.W. [Entergy Operations, Inc., Russellville, AR (United States); Cooper, J.W. Jr. [John Cooper and Associates, Tampa, FL (United States)

1995-10-01T23:59:59.000Z

454

List of Steam-system upgrades Incentives | Open Energy Information  

Open Energy Info (EERE)

upgrades Incentives upgrades Incentives Jump to: navigation, search The following contains the list of 100 Steam-system upgrades Incentives. CSV (rows 1 - 100) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active AlabamaSAVES Revolving Loan Program (Alabama) State Loan Program Alabama Commercial Industrial Institutional Building Insulation Doors Energy Mgmt. Systems/Building Controls Lighting Lighting Controls/Sensors Steam-system upgrades Water Heaters Windows Biodiesel Biomass CHP/Cogeneration Ethanol Fuel Cells using Renewable Fuels Geothermal Electric Hydroelectric energy Landfill Gas Photovoltaics Renewable Fuels Solar Water Heat Commercial Refrigeration Equipment Natural Gas Yes Ameren Missouri (Gas) - Business Energy Efficiency Program (Missouri) Utility Rebate Program Missouri Commercial

455

Employee-Focused Structure Helps Produce Upgrades for Contractor...  

Energy Savers [EERE]

Progressive Energy Solutions around three pillars: employee ownership; development of energy efficiency best practices; and superior energy upgrade work. "We all have a real...

456

Office of Energy Policy and Systems Analysis Site Upgrade  

Broader source: Energy.gov [DOE]

Office of Energy Policy and Systems Analysis site is currently being upgraded to better serve on audience. Please check back shortly.

457

Community based outreach strategies in residential energy upgrade programs  

E-Print Network [OSTI]

Home energy upgrades can reduce residential energy consumption and improve indoor conditions, thereby realizing environmental, economic, health and other social benefits. Utilities, government and other actors have established ...

McEwen, Brendan (Brendan Carl Francis)

2012-01-01T23:59:59.000Z

458

Conversion Technologies for Advanced Biofuels ? Bio-Oil Upgrading  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of bio-oils. Focus on process development activities and underlying science for biofuels production. Bio-oil Upgrading - Presenter Information Energy Efficiency & Renewable...

459

THREE VIRGINIA PROGRAMS OVERCOME BARRIERS TO UPGRADES | Department...  

Energy Savers [EERE]

upgrades. RREA used a home energy makeover contest to educate homeowners and drive demand. RREA also engaged faith-based institutions and neighborhood associations in its...

460

New Science on the Horizon as Upgraded Particle Accelerator Meets...  

Office of Science (SC) Website

New Science on the Horizon as Upgraded Particle Accelerator Meets Commissioning Milestones Nuclear Physics (NP) NP Home About Research Facilities Science Highlights Benefits of NP...

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Jefferson Lab's upgraded Free-Electron Laser produces first ligh...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

upgraded Free-Electron Laser produces first light June 18, 2003 Researchers at the U.S. Department of Energy's Thomas Jefferson National Accelerator Facility have produced first...

462

Upgrading of Pitch Produced by Mild Gasification of Subbituminous Cal  

Science Journals Connector (OSTI)

Upgrading of Pitch Produced by Mild Gasification of Subbituminous Cal ... Structural Characterization of Coal Tar Pitches Obtained by Heat Treatment under Different Conditions ...

Robert L. McCormick; Mahesh C. Jha

1994-03-01T23:59:59.000Z

463

EA-1190: Wastewater Treatment Capability Upgrade, Amarillo, Texas  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts for the proposed upgrade of the U.S. Department of Energy Pantex Plant Wastewater Treatment Plant in Amarillo, Texas.

464

PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES | Department...  

Energy Savers [EERE]

duct sealing; heating, ventilation, and air conditioning (HVAC) upgrades; sunscreens; and solar water heaters. Energize Phoenix eventually expanded its service area beyond the...

465

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange...  

Broader source: Energy.gov (indexed) [DOE]

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange Facilities: Best Management Practice Case Study 11: Commercial Kitchen Equipment (Brochure), Federal Energy...

466

Ribbon cutting marks chemistry laboratory upgrades at Northern...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ribbon cutting marks chemistry laboratory upgrades at Northern New Mexico College Community Connections: Your link to news and opportunities from Los Alamos National Laboratory...

467

Standard Work Specifications for Single-Family Home Energy Upgrades Summary (Fact Sheet), Guidelines For Home Energy Professionals, Energy Efficiency & Renewable Energy (EERE)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Work Specifications Work Specifications for Single-Family Home Energy Upgrades Summary The U.S. Department of Energy (DOE), the National Renewable Energy Laboratory (NREL) and numer- ous industry stakeholders developed the Standard Work Specifications for Single-Family Home Energy Upgrades to define the minimum requirements for high- quality residential energy upgrades. The Standard Work Specifications for Single-Family Home Energy Upgrades is the first of three documents that will be published in 2012 and 2013 as part of the Guidelines for Home Energy Professionals project. Specifications for manufactured housing and multifamily homes will also be available. DOE, NREL, and industry developed the Standard Work Specifications under the Weatherization Assistance Program, building on more than 30 years of experience

468

The value of steam turbine upgrades  

SciTech Connect (OSTI)

Technological advances in mechanical and aerodynamic design of the turbine steam path are resulting in higher reliability and efficiency. A recent study conducted on a 390 MW pulverized coal-fired unit revealed just how much these new technological advancements can improve efficiency and output. The empirical study showed that the turbine upgrade raised high pressure (HP) turbine efficiency by 5%, intermediate pressure (IP) turbine efficiency by 4%, and low pressure (LP) turbine efficiency by 2.5%. In addition, the unit's highest achievable gross generation increased from 360 MW to 371 MW. 3 figs.

Potter, K.; Olear, D.; [General Physics Corp. (United States)

2005-11-01T23:59:59.000Z

469

Syngas Upgrading to Hydrocarbon Fuels Technology Pathway  

Broader source: Energy.gov [DOE]

This technology pathway case investigates the upgrading of woody biomass derived synthesis gas (syngas) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and lowest risk conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas-to-hydrocarbon pathway to be competitive with petroleum-derived gasoline-, diesel- and jet-range hydrocarbon blendstocks.

470

ATLAS Tile Calorimeter Electronics and Future Upgrade  

E-Print Network [OSTI]

The Tile Calorimeter (TileCal) of the ATLAS experiment is the hadronic calorimeter designed for energy reconstruction of hadrons, jets, tau-particles and missing transverse energy. An overview of the on-detector and off-detector TileCal electronics used for ATLAS data taking is given. Upgrade plans for TileCal electronics for the High Luminosity LHC programme in 2024 are discussed, together with R&D activities at different laboratories that target different parts of the TileCal electronics. In particular, a demonstrator prototype for TileCal electronics to be installed during the long shutdown in 2014 is described.

Usai, G; The ATLAS collaboration

2014-01-01T23:59:59.000Z

471

MCNPX graphics and arithmetic tally upgrades  

SciTech Connect (OSTI)

The MCNPX MCPLOT package is the tool used to plot tallies and cross-sections. We report on an assortment of upgrades to MCPLOT that are intended to improve the appearance of two-dimensional tally and cross-section plots. We have also expanded the content and versatility of the MCPLOT 'help' command. Finally, we describe the initial phase of capability implementation to post-process tally data using arithmetic operations. These improvements will enable users to better display and manipulate simulation results.

Durkee, Joe W [Los Alamos National Laboratory; James, Michael R [Los Alamos National Laboratory; Waters, Laurie S [Los Alamos National Laboratory

2008-01-01T23:59:59.000Z

472

Nan Sauer named Associate Director for Chemistry, Life, and Earth Sciences  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sauer named AD for Chemistry, Life, and Earth Sciences Sauer named AD for Chemistry, Life, and Earth Sciences Nan Sauer named Associate Director for Chemistry, Life, and Earth Sciences Sauer has a distinguished track record as a research scientist with more than 60 publications and technical reports in archival journals. August 9, 2011 Nan Sauer Nan Sauer Contact Communicatons Office (505) 667-7000 LOS ALAMOS, New Mexico, August 9, 2011- Nancy ("Nan") Sauer is the new associate director for Chemistry, Life, and Earth Sciences (ADCLES) at Los Alamos National Laboratory (LANL). In her 25-year career at LANL, Sauer has held several positions of increasing responsibility. After working as a director's postdoctoral fellow, she advanced to a principal investigator and team leader in the Chemistry Division to leader of several projects. Most recently she has

473

Executive Director, ATN The position of Executive Director, Australian Technology Network  

E-Print Network [OSTI]

to policy direction in the higher education sector, has superior public advocacy and media communication information,visit: www.atn.edu.au/ATN_ED_Position_Details Applications close on 8 September 2014. EnquiriesExecutive Director, ATN The position of Executive Director, Australian Technology Network presents

University of Technology, Sydney

474

ARPA-E's 19 New Projects Focus on Battery Management and Storage |  

Broader source: Energy.gov (indexed) [DOE]

ARPA-E's 19 New Projects Focus on Battery Management and Storage ARPA-E's 19 New Projects Focus on Battery Management and Storage ARPA-E's 19 New Projects Focus on Battery Management and Storage August 7, 2012 - 1:17pm Addthis Principal Deputy Director Eric Toone, former ARPA-E Director Arun Majumdar, the Honorable Bart Gordon and IBM Research Senior Director Kathleen Kingscott discuss the future of energy innovation at an ITIF event on August 2. | Energy Department photo. Principal Deputy Director Eric Toone, former ARPA-E Director Arun Majumdar, the Honorable Bart Gordon and IBM Research Senior Director Kathleen Kingscott discuss the future of energy innovation at an ITIF event on August 2. | Energy Department photo. Alexa McClanahan Communications Support Contractor to ARPA-E What are the key facts? The 19 new ARPA-E projects span 14 states.

475

The enhanced ASDEX Upgrade pellet centrifuge launcher  

SciTech Connect (OSTI)

Pellets played an important role in the program of ASDEX Upgrade serving both for investigations on efficient particle fuelling and high density scenarios but also for pioneering work on Edge Localised Mode (ELM) pacing and mitigation. Initially designed for launching fuelling pellets from the magnetic low field side, the system was converted already some time ago to inject pellets from the magnetic high field side as much higher fuelling efficiency was found using this configuration. In operation for more than 20 years, the pellet launching system had to undergo a major revision and upgrading, in particular of its control system. Furthermore, the control system installed adjacent to the launcher had to be transferred to a more distant location enforcing a complete galvanic separation from torus potential and a fully remote control solution. Changing from a hybrid system consisting of PLC S5/S7 and some hard wired relay control to a state of the art PLC system allowed the introduction of several new operational options enabling more flexibility in the pellet experiments. This article describes the new system architecture of control hardware and software, the operating procedure, and the extended operational window. First successful applications for ELM pacing and triggering studies are presented as well as utilization for the development of high density scenarios.

PlŲckl, B.; Lang, P. T. [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)] [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)

2013-10-15T23:59:59.000Z

476

ATLAS Upgrade Instrumentation in the US  

E-Print Network [OSTI]

Planned upgrades of the LHC over the next decade should allow the machine to operate at a center of mass energy of 14 TeV with instantaneous luminosities in the range 5--7e34 cm^-2 s^-1. With these parameters, ATLAS could collect 3,000 fb^-1 of data in approximately 10 years. However, the conditions under which this data would be acquired are much harsher than those currently encountered at the LHC. For example, the number of proton-proton interactions per bunch crossing will rise from the level of 20--30 per 50 ns crossing observed in 2012 to 140--200 every 25 ns. In order to deepen our understanding of the newly discovered Higgs boson and to extend our searches for physics beyond that new particle, the ATLAS detector, trigger, and readout will have to undergo significant upgrades. In this whitepaper we describe R&D necessary for ATLAS to continue to run effectively at the highest luminosities foreseen from the LHC. Emphasis is placed on those R&D efforts in which US institutions are playing a leading role.

Gustaaf Brooijmans; Hal Evans; Abe Seiden

2013-07-22T23:59:59.000Z

477

ATLAS Upgrade Instrumentation in the US  

E-Print Network [OSTI]

Planned upgrades of the LHC over the next decade should allow the machine to operate at a center of mass energy of 14 TeV with instantaneous luminosities in the range 5--7e34 cm^-2 s^-1. With these parameters, ATLAS could collect 3,000 fb^-1 of data in approximately 10 years. However, the conditions under which this data would be acquired are much harsher than those currently encountered at the LHC. For example, the number of proton-proton interactions per bunch crossing will rise from the level of 20--30 per 50 ns crossing observed in 2012 to 140--200 every 25 ns. In order to deepen our understanding of the newly discovered Higgs boson and to extend our searches for physics beyond that new particle, the ATLAS detector, trigger, and readout will have to undergo significant upgrades. In this whitepaper we describe R&D necessary for ATLAS to continue to run effectively at the highest luminosities foreseen from the LHC. Emphasis is placed on those R&D efforts in which US institutions are playing a leadin...

Brooijmans, Gustaaf; Seiden, Abe

2013-01-01T23:59:59.000Z

478

Fermilab | Director's Policy Manual | Home  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fermilab Document Hierarchy Fermilab Document Hierarchy Fermilab Policies Assessments Assurance Program Code of Business Ethics & Conduct Combating Trafficking in Persons Community Outreach Computing Construction/Modification Demonstrations Design Document Control Environment Experimenters/Users ID Facility Reuse Program Fermilab Employee Assignments to non-US Institutions while Awaiting Visa Renewals Fermilab Scientific Appointments Financial Management Freedom of Information Act Requests Guest Appointments Inclement Weather and Snow Policy Interactions with Legislators Issues Management Maintenance MOUs Between Fermilab & Foreign Partners Operations Personally Identifiable Information Procurement Project Management Property Quality Assurance Records Management Policy Requests for Easements or License

479

2011 Computation Directorate Annual Report  

SciTech Connect (OSTI)

From its founding in 1952 until today, Lawrence Livermore National Laboratory (LLNL) has made significant strategic investments to develop high performance computing (HPC) and its application to national security and basic science. Now, 60 years later, the Computation Directorate and its myriad resources and capabilities have become a key enabler for LLNL programs and an integral part of the effort to support our nation's nuclear deterrent and, more broadly, national security. In addition, the technological innovation HPC makes possible is seen as vital to the nation's economic vitality. LLNL, along with other national laboratories, is working to make supercomputing capabilities and expertise available to industry to boost the nation's global competitiveness. LLNL is on the brink of an exciting milestone with the 2012 deployment of Sequoia, the National Nuclear Security Administration's (NNSA's) 20-petaFLOP/s resource that will apply uncertainty quantification to weapons science. Sequoia will bring LLNL's total computing power to more than 23 petaFLOP/s-all brought to bear on basic science and national security needs. The computing systems at LLNL provide game-changing capabilities. Sequoia and other next-generation platforms will enable predictive simulation in the coming decade and leverage industry trends, such as massively parallel and multicore processors, to run petascale applications. Efficient petascale computing necessitates refining accuracy in materials property data, improving models for known physical processes, identifying and then modeling for missing physics, quantifying uncertainty, and enhancing the performance of complex models and algorithms in macroscale simulation codes. Nearly 15 years ago, NNSA's Accelerated Strategic Computing Initiative (ASCI), now called the Advanced Simulation and Computing (ASC) Program, was the critical element needed to shift from test-based confidence to science-based confidence. Specifically, ASCI/ASC accelerated the development of simulation capabilities necessary to ensure confidence in the nuclear stockpile-far exceeding what might have been achieved in the absence of a focused initiative. While stockpile stewardship research pushed LLNL scientists to develop new computer codes, better simulation methods, and improved visualization technologies, this work also stimulated the exploration of HPC applications beyond the standard sponsor base. As LLNL advances to a petascale platform and pursues exascale computing (1,000 times faster than Sequoia), ASC will be paramount to achieving predictive simulation and uncertainty quantification. Predictive simulation and quantifying the uncertainty of numerical predictions where little-to-no data exists demands exascale computing and represents an expanding area of scientific research important not only to nuclear weapons, but to nuclear attribution, nuclear reactor design, and understanding global climate issues, among other fields. Aside from these lofty goals and challenges, computing at LLNL is anything but 'business as usual.' International competition in supercomputing is nothing new, but the HPC community is now operating in an expanded, more aggressive climate of global competitiveness. More countries understand how science and technology research and development are inextricably linked to economic prosperity, and they are aggressively pursuing ways to integrate HPC technologies into their native industrial and consumer products. In the interest of the nation's economic security and the science and technology that underpins it, LLNL is expanding its portfolio and forging new collaborations. We must ensure that HPC remains an asymmetric engine of innovation for the Laboratory and for the U.S. and, in doing so, protect our research and development dynamism and the prosperity it makes possible. One untapped area of opportunity LLNL is pursuing is to help U.S. industry understand how supercomputing can benefit their business. Industrial investment in HPC applications has historically been limited by the prohibitive cost of entry

Crawford, D L

2012-04-11T23:59:59.000Z

480

AVIATION BOARD OF DIRECTORS BYLAWS AND PROTOCOLS  

Broader source: Energy.gov (indexed) [DOE]

AVIATION BOARD OF DIRECTORS AVIATION BOARD OF DIRECTORS BYLAWS AND PROTOCOLS The Department of Energy strives to manage its Aviation Program toward the highest standards of safety, efficiency, fairness in contracting, preservation of competition in the private sector, open communication, prudent property management, and the best examples of resource management. Toward these ends, the Department has established a management structure led by a Board of Directors comprising active Federal employee aviation managers from the Department. AUTHORITY: The following authorities serve as basis for this structure and system: Office of Management and Budget Circular A-126, FMR 102.33, DEAR 109, DOE Order 440.2B, Aviation Management Review Team Report, March 1999, and Secretary of Energy Appointment and Delegation of Authority, April 15, 1999.

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

APS Director Stephenson Named Argonne Distinguished Fellow  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Advanced Photon Source, Canadian Light Source Strengthen Ties, Expand X-ray Advanced Photon Source, Canadian Light Source Strengthen Ties, Expand X-ray Technology and Research Rose of APS and CNM One of Four DOE Early Career Award Winners Scientists Close-In on Artificial Spider Silk Ekiert Earns 2012 APSUO Franklin Award for Studies of Influenza Virus Clever Apes on WBEZ: Breaking the Fossil Record APS News Archives: 2012 | 2011 | 2010 | 2009 2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed APS Director Stephenson Named Argonne Distinguished Fellow JULY 19, 2012 Bookmark and Share Brian Stephenson Brian Stephenson has been named one of five Argonne National Laboratory Distinguished Fellows for 2012. Stephenson is the Argonne Associate Laboratory Director for Photon Sciences and Director of the U.S. Department

482

Project Assessment (OPA) Homepage | U.S. DOE Office of Science (SC)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OPA Home OPA Home Project Assessment (OPA) OPA Home About Project Management SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov 2012 Project Management Awards Secretary's Award of Excellence Building 51 and Bevatron Demolition Project at LBNLRead More Bevatron 2012 Project Management Awards Secretary's Award of Achievement Daya Bay Reactor Neutrino Detector Project at LBNLRead More Daya Bay 2012 Project Management Awards Federal Project Director of the Year Hannibal Joma, Federal Project Director for the LUSI Project at SLACRead More Hannibal 1 of 2 Print

483

Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway  

Broader source: Energy.gov [DOE]

This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline-, diesel-, and jet-range hydrocarbon blendstocks.

484

Secure upgrade of hardware security modules in bank networks  

Science Journals Connector (OSTI)

We study the secure upgrade of critical components in wide networked systems, focussing on the case study of PIN processing Hardware Security Modules (HSMs). These tamper-resistant devices, used by banks to securely transmit and verify the PIN typed ... Keywords: PIN processing, hardware security modules, security APIs, upgrade strategies

Riccardo Focardi; Flaminia L. Luccio

2010-03-01T23:59:59.000Z

485

Recent ASDEX Upgrade Research in Support of ITER and DEMO  

E-Print Network [OSTI]

Energy Conference, OV2/2, St. Petersburg, Russia, 13.10.2014 · ASDEX Upgrade: machine and programme allowed (?) Virtually no disruptions #12;ASDEX Upgrade has a powerful H&CD system Neutral Beam Injection;Stagnation of core density build-up due to fuelling limit (source shifts to SOL) High SOL density leads

486

Properties of Upgraded Shengli Lignite and Its Behavior for Gasification  

Science Journals Connector (OSTI)

Low-rank coals (LRCs, i.e., brown coal and lignite) have an estimated proportion of 45% of the worldís coal reserves and constitute a significant resource for both energy and chemical feedstocks. ... (10)Figure 15 shows the calculating results of reactivity parameters (Rmax, Rave, and R) for SL lignite and different upgraded lignites obtained by isothermal upgrading. ...

Xianjun Yang; Cheng Zhang; Peng Tan; Tao Yang; Qingyan Fang; Gang Chen

2013-10-29T23:59:59.000Z

487

LHC accelerator R&D and upgrade scenarios  

Science Journals Connector (OSTI)

I report the results of a CERN task force set up to investigate a possible staged upgrade of the LHC and of its injectors, with a view...34 cmĖ2 sĖ1 to 1035 cmĖ2 sĖ1. Scenarios for an LHC energy upgrade by nearly...

F. Ruggiero

2004-07-01T23:59:59.000Z

488

Unique Solar Thermal Laboratory Gets an Upgrade | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Unique Solar Thermal Laboratory Gets an Upgrade Unique Solar Thermal Laboratory Gets an Upgrade Unique Solar Thermal Laboratory Gets an Upgrade September 10, 2010 - 2:54pm Addthis This √ʬĬúpower tower√Ę¬Ä¬Ě is part of the National Solar Thermal Test Facility in Albuquerque, which is getting upgrades through Recovery Act funding. | Photo Courtesy of Sandia National Laboratories This "power tower" is part of the National Solar Thermal Test Facility in Albuquerque, which is getting upgrades through Recovery Act funding. | Photo Courtesy of Sandia National Laboratories Lorelei Laird Writer, Energy Empowers The National Solar Thermal Test Facility at Sandia National Laboratories is unique - and in demand. The Facility has been instrumental in NASA tests, national defense programs and concentrated solar technology development.

489

Energy Efficiency Upgrades Help Retired Military Officers Save Money |  

Broader source: Energy.gov (indexed) [DOE]

Energy Efficiency Upgrades Help Retired Military Officers Save Energy Efficiency Upgrades Help Retired Military Officers Save Money Energy Efficiency Upgrades Help Retired Military Officers Save Money May 7, 2013 - 12:50pm Addthis A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs What are the key facts? A retirement community in San Antonio worked with a local Better

490

Energy Efficiency Upgrades Help Retired Military Officers Save Money |  

Broader source: Energy.gov (indexed) [DOE]

Efficiency Upgrades Help Retired Military Officers Save Efficiency Upgrades Help Retired Military Officers Save Money Energy Efficiency Upgrades Help Retired Military Officers Save Money May 7, 2013 - 12:50pm Addthis A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs What are the key facts? A retirement community in San Antonio worked with a local Better

491

Energy Efficiency Upgrades Help Build Better Neighborhoods | Department of  

Broader source: Energy.gov (indexed) [DOE]

Efficiency Upgrades Help Build Better Neighborhoods Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods May 6, 2013 - 4:55pm Addthis In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs

492

Energy Efficiency Upgrades Help Build Better Neighborhoods | Department of  

Broader source: Energy.gov (indexed) [DOE]

Energy Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods May 6, 2013 - 4:55pm Addthis In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs

493

High temperature ceramic membrane reactors for coal liquid upgrading. Quarterly report No. 10, December 21, 1991--March 20, 1992  

SciTech Connect (OSTI)

In this project we will study a novel process concept, i.e., the use of ceramic membrane reactors in upgrading of coal model compounds and coal derived liquids. In general terms, the USC research team is responsible for constructing and operating the membrane reactor apparatus and for testing various inorganic membranes for the upgrading of coal derived asphaltenes and coal model compounds. The USC effort will involve the principal investigator of this project and two graduate research assistants. The ALCOA team is responsible for the preparation of the inorganic membranes, for construction and testing of the ceramic membrane modules, and for measurement of their transport properties. The ALCOA research effort will involve Dr. Paul K. T. Liu, who is the project manager of the ALCOA research team, an engineer and a technician. UNOCAL`s contribution will be limited to overall technical assistance in catalyst preparation and the operation of the laboratory upgrading membrane reactor and for analytical back-up and expertise in oil analysis and materials characterization. UNOCAL is a no-cost contractor but will be involved in all aspects of the project, as deemed appropriate.

Tsotsis, T.T.

1992-07-01T23:59:59.000Z

494

E-Print Network 3.0 - asdex upgrade edge Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrade Team presented by Sibylle Gnter MPI fr Plasmaphysik, D-85748 Garching, Germany, EURATOM... collaborating institutes: 12;ASDEX Upgrade programme ... Source:...

495

E-Print Network 3.0 - asdex upgrade h-mode Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrade Team presented by Sibylle Gnter MPI fr Plasmaphysik, D-85748 Garching, Germany, EURATOM... collaborating institutes: 12;ASDEX Upgrade programme ... Source:...

496

E-Print Network 3.0 - asdex upgrade team Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrade Team presented by Sibylle Gnter MPI fr Plasmaphysik, D-85748 Garching, Germany, EURATOM... Overview of ASDEX Upgrade Results - Development of integrated operating...

497

EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmissio...  

Broader source: Energy.gov (indexed) [DOE]

1: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line, Benton and Yakima Counties, Washington EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade...

498

Extension - Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption  

SciTech Connect (OSTI)

The need for cost effective technologies for upgrading coal mine methane to pipeline quality natural gas is becoming ever greater. The current work presents and investigates a new approach to reduce the impact of the most costly step in the conventional technology, nitrogen rejection. The proposed approach is based on the Velocys microchannel platform, which is being developed to commercialize compact and cost efficient chemical processing technology. For this separation, ultra fast thermal swing sorption is enabled by the very high rates of heat and mass transfer inherent in microchannel processing. In a first phase of the project solid adsorbents were explored. Feasibility of ultrafast thermal swing was demonstrated but the available adsorbents had insufficient differential methane capacity to achieve the required commercial economics. In a second phase, ionic liquids were adopted as absorbents of choice, and experimental work and economic analyses, performed to gauge their potential, showed promise for this novel alternative. Final conclusions suggest that a combination of a required cost target for ionic liquids or a methane capacity increase or a combination of both is required for commercialization.

Anna Lee Tonkovich

2008-08-11T23:59:59.000Z

499

Micromegas chambers for the ATLAS Muon Spectrometer Upgrade  

E-Print Network [OSTI]

Micromegas (Micro MEsh Gaseous Structure) chambers have been proven along the years to be reliable fast detectors with an excellent spatial resolution. The ATLAS collaboration at LHC has chosen the micromegas technology along with the small-strip Thin Gap Chambers (sTGC) for the high luminosity upgrade of the inner muon station in the high-rapidity region, the so called New Small Wheel (NSW). It employs eight layers of micromegas detectors and eight layers of sTGC. The NSW project requires fully efficient micromegas chambers with spatial resolution down to $100\\mu m$ over a total active area of $1200 m^2$ with a rate capability up to $10 kHz/cm^2$ and operation in a moderate magnetic field up to B=0.3 T. The required tracking capability is provided by the intrinsic space resolution combined with a mechanical precision at the level of $30 \\mu m$ along the precision coordinate. Moreover together with the precise tracking capability the micromegas chambers should provide a trigger signal. An extensive R&D pr...

Ntekas, Konstantinos; The ATLAS collaboration

2014-01-01T23:59:59.000Z

500

Upgrading the TFTR Transrex Power Supplies  

SciTech Connect (OSTI)

In order to provide improved and expanded experimental capabilities, the existing Transrex power supplies at PPPL are to be upgraded and modernized. Each of the 39 power supplies consists of two six pulse silicon controlled rectifier sections forming a twelve pulse power supply. The first modification is to split each supply into two independent six pulse supplies by replacing the existing obsolete twelve pulse firing generator with two commercially available six pulse firing generators. The second change replaces the existing control link with a faster system, with greater capacity, which will allow for independent control of all 78 power supply sections. The third change replaces the existing Computer Automated Measurement and Control (CAMAC) based fault detector with an Experimental Physics and Industrial Control System (EPICS) compatible unit, eliminating the obsolete CAMAC modules. Finally the remaining relay logic and interfaces to the "Hardwired Control System" will be replaces with a Programmable Logic Controller (PLC).

J. E. Lawson, R. Marsala, S. Ramakrishnan, X. Zhao, P. Sichta

2009-05-29T23:59:59.000Z