Powered by Deep Web Technologies
Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Federal Project Directors in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

appropriate front-end plan- appropriate front-end plan- ning process would help DOE to identify the mission need for the project and aid in iden- tification and evaluation of alternative approaches and assessment of the cost and risks of each. This should lead to a well-defined set of re- quirements and scope of work that form the basis for effec- tive design. Front-end plan- ning in the DOE project man- agement system includes plan- ning procedures from project conception through approval of the performance baseline (CD-2). The Office of Engineering and Construction Management has developed two guides to assist Federal Project Directors in measuring progress toward achieving technology and pro- ject definition maturity during front-end planning prior to CD -2. DOE G 413.3-4, Technol-

2

Principal Associate Director - Capital Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Principal Associate Director - Capital Projects Principal Associate Director - Capital Projects As Principal Associate Director for Capital Projects, Henry is responsible for institutional large-project construction and management and environmental cleanup functions. Contact Operator Los Alamos National Laboratory (505) 667-5061 Before coming to the Lab in 2011, he served as manager of the $3.2 billion project to safely destroy the stockpile of deadly mustard chemical agent at the Pueblo Chemical Depot in Colorado. Paul Henry Principal Associate Director for Capital Projects Paul Henry, Principal Associate Director for Capital Projects As Principal Associate Director for Capital Projects, Henry is responsible for institutional large-project construction and management and environmental cleanup functions.

3

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network (OSTI)

Project. DOE Order 413.3B will provide the basis for the overall management of the Project. 1.2 Key of project management and control systems outlined in this PEP and DOE Order 413.3B ("Program and Project 10/12/2012 Update to WBS Level 2 Threshold (top of page 20), Change DOE Federal Project Director

Princeton Plasma Physics Laboratory

4

Milton Appointed as ANL LCLS Project Director  

NLE Websites -- All DOE Office Websites (Extended Search)

side of the project has been ably overseen by Efim Gluskin, Director of the Experimental Facilities Division. However, as the project ramps up, it is essential that LCLS...

5

Directors Advance EM Mission with Help from Rigorous Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Directors Advance EM Mission with Help from Rigorous Project Management Program Directors Advance EM Mission with Help from Rigorous Project Management Program October 30, 2013 -...

6

Federal Project Director Toolbox | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Federal Project Director Toolbox Federal Project Director Toolbox Federal Project Director Toolbox Although the majority of the documents listed on this page appear elsewhere on the PMCDP Web site, the FPD Tool Box page was specifically designed with all current and aspiring FPDs in mind in that it houses all of the PMCDP's major tools and job aids in one specific, easy-to-access location. Whether you are applying for a new level of certification, or determining which courses or activities will provide you with the most continuing education credits, the Toolbox is the place to go to locate the best information that will ensure your success in the PMCDP program. Below is a list of the most prominent PMCDP job aids to include a brief summary of their respective contents: Certification Equivalency Guideline (CEG): The CEG establishes the U.S.

7

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network (OSTI)

Project. DOE Order 413.3B will provide the basis for the overall management of the Project. 1.2 Key of project management and control systems outlined in this PEP and DOE Order 413.3B ("Program and Project ..............................................................................................................................1 1.2.1 DOE-approved project documents

Princeton Plasma Physics Laboratory

8

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network (OSTI)

Project. DOE Order 413.3B will provide the basis for the overall management of the Project. 1.2 Key the principles of project management and control systems outlined in this PEP and DOE Order 413.3B ("Program ..............................................................................................................................1 1.2.1 DOE-approved project documents

Princeton Plasma Physics Laboratory

9

HERA Upgrade Project | Superconducting Magnet Division  

NLE Websites -- All DOE Office Websites (Extended Search)

HERA Upgrade Project HERA Upgrade Project As part of the HERA luminosity upgrade, 6 superconducting Interaction Region quadrupoles were delivered, accepted, and are in service. These 6 layer magnets were designed to include the main quadrupole focus, a skew quad, a normal and skew dipole, and a final sextupole layer. Because of the physical space constraints imposed by the existing detector region components, the DESY magnets were of necessity designed to be very compact. In addition, they are also are required to operate within the solenoidal detector fields at the collision points, so all construction materials had to be non magnetic. Two types of DESY magnets were fabricated. The first, designated as G0, was a two meter long, constant radius magnet. The second, designated GG, is a

10

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project...

11

Fermilab | Directorate | Office of Project Management Oversight...  

NLE Websites -- All DOE Office Websites (Extended Search)

of Project Support Services (PSS) Projects Fermilab Scientific and Facility Projects (DOE 413 Projects) Fermilab Programs Fermilab Management Projects OPMO Projects Policies...

12

Federal Project Director Toolbox | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The DOE Orders that specifically pertain to the creation and maintenance of the PMCDP are DOE O 413.3B and DOE 0 361.1B. Click here to view a recent presentation by the Director of...

13

REQUEST FOR INDIRECT COST WAIVER I. Project Director  

E-Print Network (OSTI)

REQUEST FOR INDIRECT COST WAIVER I. Project Director: Department: Project Title: Project Sponsor without fully recovering the institutional indirect costs which will be incurred in conducting the project COSTS 1. FULL: OF I. A. C. 2. PARTIAL: OF H. B. K. TOTAL PROJECT COSTS L. INDIRECT COSTS TO BE WAIVED, J

Krovi, Venkat

14

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROJECT PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 JULY 2010 TABLE OF CONTENTS INTRODUCTION 1. The Challenge...

15

Modernization Project Office, Facilities & Operations Directorate...  

NLE Websites -- All DOE Office Websites (Extended Search)

Welcome to the... Modernization Project Office The Modernization Project Office (MPO) is responsible for engineering, design, cost estimating, scheduling, and project controls,...

16

The high wire balancing act of the IS project director  

Science Conference Proceedings (OSTI)

The implementation of a cross-functional enterprise system requires a more sustained and comprehensive change management program than does classical Information System (IS) application development. The tools and techniques used in such projects will ... Keywords: MIS development projects, case study, project directors, roles

Vital Roy; Carmen Bernier; Lucie Lťveillť

2006-01-01T23:59:59.000Z

17

Project L-070, ``300 Area process sewer piping system upgrade`` Project Management Plan  

Science Conference Proceedings (OSTI)

This document is the project management plan for Project L-070, 300 Area process sewer system upgrades.

Wellsfry, H.E.

1994-09-16T23:59:59.000Z

18

Categorical Exclusion 4598: Security Upgrade Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Determination Form Determination Form Proposed Action Title: Security Upgrade Project (4598) Program or Field Office~ Y·12 Site Office LocationCs) CCjty/County/State): Oak Ridge. Anderson County, Tennessee Proposed Action Description: PAGE 04 / 04 r~:·:~~s ·'-u ~'irllO:.'~~b ., .. y " ~e ··· ., ;:;;,il ,;: ; I·;;;:;;,; ;I ,' .: :~~. ,U,Illll\;: , "':ll ,l3~ . ~~~~ 1 ~; The proposed action is to add fence posts and run razor wire in various fence locations throughout the site. This project will not require excavation. This activity will disturb gravel but will not remove gravel and soil from post holes which will be placed back in the same area. Cat.eg,orieal Exc!usion(s) ,Mp!i.cd: 81.3- Routine maintenance

19

EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR SUMMARY This project would replace aging equipment at BPA's Celilo converter station and to upgrade equipment on the...

20

Response to Director's Review of Fermilab Project Management Improvement Initiatives  

NLE Websites -- All DOE Office Websites (Extended Search)

Response to Director's Review of Fermilab Project Management Improvement Initiatives Response to Director's Review of Fermilab Project Management Improvement Initiatives May 14, 2013 Executive Summary Fermilab is entering a new, transitional era defined by the transformation from operating a very large experimental facility over several decades to managing and delivering a portfolio of new projects within technical performance, budget and schedule expectations. Throughout CY12, internal and external reviews identified some systemic weaknesses in execution of some construction activities and fabrication of components, including procurement planning and execution, cost estimating, and internal project communication. These Project Management System concerns have the potential to impact other projects and operational activities at the Laboratory if not addressed. Coincident with the

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, 37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR SUMMARY This project would replace aging equipment at BPA's Celilo converter station and to upgrade equipment on the Celilo-Sylmar 500-kilovolt (kV) transmission line from the Celilo converter station in The Dalles, Oregon to the Nevada-Oregon border. As part of the project, BPA would remove and salvage the converter terminals 1 and 2 at its Celilo converter station and install a new two-converter terminal. A 20-acre expansion of the existing substation would accommodate the new terminal equipment. About 265 miles of transmission towers on the Celilo-Sylmar 500-kV transmission line would be

22

Certified Federal Project Directors | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Certified Federal Project Directors Certified Federal Project Directors Project Assessment (OPA) OPA Home About Project Management SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Certified Federal Project Directors FPD Leadership Skills .pdf file (29KB) SC FPD 360¬į Mentoring Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov SC Federal Project Directors (FPD) and FPD Resources Certified Federal Project Directors Print Text Size: A A A RSS Feeds FeedbackShare Page Site Federal Project Director Level Certified Project Contact Information Ames Site Office (AMSO) Cynthia Baebler 1 630-252-1563 cynthia.baebler@ch.doe.gov Argonne Site Office (ASO) Dale Dietzel 1 630-252-2555 dale.dietzel@ch.doe.gov

23

Request for Proposals for New or Upgraded Transmission Line Projects...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012...

24

Post Critical Decision-4 Mark Arenaz, Federal Project Director  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31, 2011 31, 2011 Lessons Learned from the In-Situ Grouting in the Subsurface Disposal Area Post Critical Decision-4 Mark Arenaz, Federal Project Director Summary Protection of the Snake River Plain Aquifer is a major driver for environmental remediation at the Department of Energy's (DOE) Idaho Site. In 2010, the Idaho Cleanup Project (ICP) used in-situ grouting to stabilize buried waste and reduce the migration of specific radioactive contaminates to the aquifer. The action was accomplished using American Recovery and Reinvestment Act (Public Law 111-5) Program funding of a capital asset acquisition project under DOE Order 413.3A, Program and Project Management for Acquisition of Capital Assets. Lessons learned from previous subsurface grouting activities contributed to the safe, timely and

25

The 12 GeV CEBAF Upgrade Project at Thomas Jefferson National Accelerator Facility, OAS-RA-L-11-13  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 GeV CEBAF Upgrade 12 GeV CEBAF Upgrade Project at Thomas Jefferson National Accelerator Facility OAS-RA-L-11-13 September 2011 Department of Energy Washington, DC 20585 September 30, 2011 MEMORANDUM FOR THE DEPUTY DIRECTOR FOR SCIENCE PROGRAMS, OFFICE OF SCIENCE DIRECTOR, OFFICE OF RISK MANAGEMENT AND FINANCIAL POLICY, OFFICE OF THE CHIEF FINANCIAL OFFICER FROM: David Sedillo, Director NNSA & Science Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The 12 GeV CEBAF Upgrade Project at Thomas Jefferson National Accelerator Facility" Audit Report Number: OAS-RA-L-11-13 BACKGROUND In September 2008, the Department of Energy's (Department) Office of Science approved a construction project to double the electron beam energy of the Continuous Electron Beam

26

Charles D. Young Project Engineer Government Support Directorate  

Office of Legacy Management (LM)

Please call if you have questions regarding the attached recommendation. i?&,o-o; Please call if you have questions regarding the attached recommendation. i?&,o-o; ~~~pApv $l$I Charles D. Young Project Engineer Government Support Directorate Architecture Planning and Technology Division CDY/smb Attachment cc: J. Fiore ;;,ewis (w/o) TH' E AEROSPACE CORPORATION i ' 0 A Suite 7900, 955 L' Enfam Plaza. S. W., Woshingron. D.C. 20024-2174. Tekphonc (202) 488-6000 7117-03.87.cdy.43 23 September 1987 CA Mr. Andrew Wallo, III, NE-23 Division of Facility & Site Decosunissioning Projects U.S. Department of Energy Germantown, Maryland 20545 Dear Mr. Wallo: ELIMINATION RECOMMENDATION -- COLLEGES AND UNIVERSITIES The attached elimination reconnnendation was prepared in accordance PC.o= with your suggestion during our meeting on 22 September. The recommendation flD.o-02

27

Status of the ATF Damping Ring BPM Upgrade Project  

Science Conference Proceedings (OSTI)

A substantial upgrade of the beam position monitors (BPM) at the ATF (Accelerator Test Facility) damping ring is currently in progress. Implementing digital read-out signal processing techniques in line with an optimized, low-noise analog downconverter, a resolution well below 1 mum could be demonstrated at 20 (of 96) upgraded BPM stations. The narrowband, high resolution BPM mode permits investigation of all types of non-linearities, imperfections and other obstacles in the machine which may limit the very low target aimed vertical beam emittance of < 2 pm. The technical status of the project, first beam measurements and an outlook to it's finalization are presented.

Briegel, C.; /Fermilab; Eddy, N.; /Fermilab; Haynes, B.; /Fermilab; May, J.; /SLAC; McCormick, D.; /SLAC; Nelson, J.; /SLAC; Nicklaus, D.; /Fermilab; Prieto, P.; /Fermilab; Rechenmacher, R.; /Fermilab; Smith, T.; /SLAC; Teranuma, N.; /KEK, Tsukuba; Urakawa, J.; /KEK, Tsukuba; Voy, D.; /Fermilab; Wendt, M.; /Fermilab; Woodley, M.; /SLAC

2011-12-01T23:59:59.000Z

28

Energy and Emissions Savings through Insulation Upgrade Projects  

E-Print Network (OSTI)

The presentation demonstrates the value of including insulation system assessment, repairs and upgrades on a facility's physical function and its importance in the overall energy and environmental management program. Financial and environmental benefits are quantified and physical improvements detailed. The presentation will highlight the key components and successful execution of an insulation assessment and upgrade project. This includes: ē The extent of the problem ē How the current state happened ē The stake / reward for plants Specific case studies will be used including Sunoco and Marathon Petroleum

Lettich, M.

2008-01-01T23:59:59.000Z

29

Project Management Plan (PMP), W-364, 209E septic system upgrade, 200 East Area  

SciTech Connect

The document is the Project Management Plan (PMP) of the design and installation of the 209E Septic System Upgrade.

Lott, D.T.

1994-09-20T23:59:59.000Z

30

Fernald Environmental Management Project Director's Final Findings and Orders, October 4, 1995  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fernald Environmental Management Project Director's Final Findings and Orders, Octobe.. Page 1 of 17 Fernald Environmental Management Project Director's Final Findings and Orders, Octobe.. Page 1 of 17 EM Home | Regulatory Compliance | Environmental Compliance Agreements Fernald Environmental Management Project Director's Final Findings and Orders, October 4, 1995 BEFORE THE OHIO ENVIRONMENTAL PROTECTION AGENCY In the Matter Of: United States Department of Energy : Director's Final Fernald Environmental Management Project : Findings and Orders P.O. Box 389705 : Cincinnati, Ohio 45239 : Respondent It is hereby agreed by and among the parties hereto as follows: Table of Contents I. Jurisdiction II. Parties Bound III. Definitions IV. Findings of Fact V. Orders VI. Limitations of Director's Approval VII. Notice VIII. Project Managers IX. Dispute Resolution

31

Federal Project Director of the Year for 2011 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Project Director of the Year for 2011 Federal Project Director of the Year for 2011 Federal Project Director of the Year for 2011 (from left to right) Daniel Poneman; David Arakawa; Phillip Kraushaar; Johnny Moore; Daniel Lehman; Ingrid Kolb (from left to right) Daniel Poneman; David Arakawa; Phillip Kraushaar; Johnny Moore; Daniel Lehman; Ingrid Kolb Presented to: David K. Arakawa For demonstrating exceptional leadership and project management acumen as Federal Project Director (FPD) for the $68.5 million Spallation Neutron Source (SNS) Instruments - Next Generation (SING) Project at Oak Ridge National Laboratory. The SING project provides five best-in-class neutron instruments to support the neutron-scattering needs of the U.S. research community. FPD since June of 2006, David led by example with a

32

A new ATLAS efficiency and intensity upgrade project.  

SciTech Connect

The ATLAS facility provides beams of essentially all stable isotopes at energies above the Coulomb barrier for nuclear physics research. We have developed a two-stage ATLAS upgrade plan which includes the replacement of aging split-ring cavities by high-performance quarter-wave resonators (QWR) capable of accelerating {approx}100 p{mu}A ion beams. The first stage of the upgrade project funded through the American Recovery and Reinvestment Act includes accelerator efficiency increase by adding a new RFQ injector, development and construction of a new cryomodule containing up to 3 SC solenoids and 8 QWRs. A new 72.75 MHz resonator is designed for an optimum ion velocity {beta} = 0.075. To achieve record high accelerating voltage {approx}2.5 MV at this very low velocity range, EM properties of the resonator are highly optimized to reduce peak surface fields. The resonator will be equipped with a piezoelectric fast tuner and capacitive coupler to transmit several kilowatts of RF power. The vast experience gained during the development, commissioning and operation of the ATLAS energy upgrade cryomodule [1] will be applied for the design of the new cryomodule.

Ostroumov, P. N.; Fuerst, J. D.; Kelly, M. P.; Mustapha, B.; Shepard, K. W.; Xu, J.; Physics

2009-01-01T23:59:59.000Z

33

Plains & Eastern Clean Line Project Proposal for New or Upgraded  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plains & Eastern Clean Line Project Proposal for New or Upgraded Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010) Update to Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (August 2011) More Documents & Publications EIS-0486: Notice of Intent and Notice of Potential Floodplain and Wetland Involvement Notice of Intent To Prepare an Environmental Impact Statement for the

34

Switchyards Rebuild and Upgrade Project in Mohave County, Arizona  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. . Categorical Exclusion for the Demolition of a Service Building at Davis Dam Lower 230-kV Switchyard as part of the Overall Switchyards Rebuild and Upgrade Project in Mohave County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western Area Power Administration (Western) plans to demolish a service building located in the Lower 230-kV Switchyard at Davis Dam, because it no longer meets our needs and we do not anticipate finding a use for it in the future. The building is currently vacant and has been for years. We plan to begin the work on April 1 ,2011 and complete it by December 31,2011. The attached map shows the project area location. Aerial photographs show that much of this area is developed. Western owns the land. The legal description is

35

12 GeV Upgrade Project - Cryomodule Production  

Science Conference Proceedings (OSTI)

The Thomas Jefferson National Accelerator Facility (Jefferson Lab) is producing ten 100+MV SRF cryomodules (C100) as part of the CEBAF 12 GeV Upgrade Project. Once installed, these cryomodules will become part of an integrated accelerator system upgrade that will result in doubling the energy of the CEBAF machine from 6 to 12 GeV. This paper will present a complete overview of the C100 cryomodule production process. The C100 cryomodule was designed to have the major components procured from private industry and assembled together at Jefferson Lab. In addition to measuring the integrated component performance, the performance of the individual components is verified prior to being released for production and assembly into a cryomodule. Following a comprehensive cold acceptance test of all subsystems, the completed C100 cryomodules are installed and commissioned in the CEBAF machine in preparation of accelerator operations. This overview of the cryomodule production process will include all principal performance measurements, acceptance criterion and up to date status of current activities.

J. Hogan, A. Burrill, G.K. Davis, M.A. Drury, M. Wiseman

2012-07-01T23:59:59.000Z

36

Darrie Ganzhorn: Director of Programs and Operations, Homeless Garden Project  

E-Print Network (OSTI)

project, and learning a lot about compost and reallybeing excited about compost and how it worked in ourDavidson was working with compost and working with getting

Reti, Irene H.

2010-01-01T23:59:59.000Z

37

Post Critical Decision-4 Mark Arenaz, Federal Project Director  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

design has been a factor in the success of grouting and in the pilot scale tests for the sodium-bearing waste treatment system (a concurrent ICP project). The risk register...

38

LED Light Fixture Project FC1 Director's Conference Room: Life Cycle Cost and Break-even Analysis  

E-Print Network (OSTI)

LED Light Fixture Project ­ FC1 Director's Conference Room: Life Cycle Cost and Break-even Analysis. #12;LED Light Fixture Project ­ FC1 Director's Conference Room: Life Cycle Cost and Break,812 Maintenance Cost $620 $0 $97 $0 Life Cycle Cost $1,787 $1,693 $2,980 $2,980 #12;LED Light Fixture Project ­ FC

Hofmann, Hans A.

39

Fernald Environmental Management Project Director's Final Findings & Orders, September 10, 1993  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SEPI o 1993 SEPI o 1993 OHIO ENlmo In the Matter of: U. S. Department of Energy Femald Environmental Management Project P.O. Box 389705 Cincinnati, Ohio 45239 Issue Date: Effective Date: SEP1 0 1993 BEFORE THF, NMENTAL PROTECTION AGENCY . Director's Final Fi&in~s and Orders PREAMBLE It is hereby agreed by and among the parties hereto as follows: I. J-VRISDICTION These Director's F;ina.lFindings and Orders ("Orders") are issued to the U.S. Department of Energy ("Respondent") pursuant to the authority vested in the Director of the Ohio Environmental Protection Agency ("Ohio EPA") in Ohio Revised Code ("ORC") sections3734.02(G) and 3745.01. TheseOrders shallapply to and be binding upon the Respondent,its agents, assigns,

40

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Montana-to-Washington Transmission System Upgrade Project 4: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana SUMMARY This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations. The project website is http://efw.bpa.gov/environmental_services/Document_Library/M2W/. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVALABLE FOR DOWNLOAD May 3, 2012 EIS-0484: Notice of Intent to Prepare an Environmental Impact Statement

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

The Role of The fedeRal PRojecT diRecToR  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Role of The fedeRal PRojecT diRecToR: Role of The fedeRal PRojecT diRecToR: lessons fRom The naTional igniTion faciliTy The national ignition facility (nif) is home of the world's largest laser. With 192 laser beams that can deliver more than 60 times the energy of any previous laser system, NIF represents a significant step in enabling the study of high-energy density science, and should demonstrate fusion ignition and burn in the laboratory for the first time. The design and construction of this unique, highly complex facility posed management challenges that the project team overseeing its development could not foresee. The national ignition facility's final optics assemblies, shown here mounted on the lower hemisphere of the target chamber, contain

42

EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona  

NLE Websites -- All DOE Office Websites (Extended Search)

48: Gila-North Gila Rebuild and Upgrade Project, Yuma County, 48: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona SUMMARY DOE's Western Area Power Administration (Western) is preparing an EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service's construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies. PUBLIC COMMENT OPPORTUNITIES Send comments on the Draft Environmental Assessment by January 21, 2014, by

43

darpa director appointed  

Science Conference Proceedings (OSTI)

08/12 - DARPA DIRECTOR APPOINTED. Regina E. Dugan has been appointed Director of the Defense Advanced Research Projects Agency (DARPA). It is the†...

44

Fermilab | Directorate |  

NLE Websites -- All DOE Office Websites (Extended Search)

thumb thumb thumb thumb thumb thumb thumb thumb thumb thumb thumb thumb thumb thumb thumb photo Nigel Lockyer Laboratory Director Profile photo Victoria A. White Chief Operating Officer Profile photo Stuart Henderson Associate Laboratory Director for Accelerators Profile photo Greg Bock Associate Laboratory Director for Particle Physics Profile photo Randy Ortgiesen Associate Laboratory Director for Operations Support Profile photo Martha Michels Director for ESH&Q and Head of the ESH&Q Section Profile photo Cynthia Conger Chief Financial Officer Profile photo Carl Strawbridge Interim Head, Integrated Planning & Performance Management Profile photo Jim Strait LBNE Project Manager Profile photo Robert Kephart IARC Director/ SRF Program Manager View Profile Profile photo Stephen Geer Head, Program Planning Office

45

Seismic review of vault for MFTF upgrade project  

SciTech Connect

This letter report was prepared in accordance with the scope of work for the preconceptual seismic evaluation of the (..cap alpha.. + T) Tandem Mirror Fusion Machine concrete vault. The scope of the work was developed with the assistance of the Bechtel site representative Dr. Sunil Ghose. The report contains comments and preconceptual recommendations on wall upgrading for an 150-ton crane installation, concrete vault seismic capability for (..cap alpha.. + T) conditions, and recommendations for future work.

Franklin, H.A.

1983-09-29T23:59:59.000Z

46

Fernald Environmental Management Project Director's Final Findings & Orders, June 6, 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. - . - ~ June 6, 1996 Re: Director's Final Findings & Orders U.S. Department of Energy Cincinnati, Ohio U.S. EPA ID No: OH6890008976 Mr. Phil Hammric U.S. Department of Energy Femald Environmental Management Project P.O. Box 389705 Cincinnati, Ohio 45239 Mr. John Bradbume Femald Environmental Restoration Corporation P.0. Box 538704 Cincinnati, Ohio 45253-8704 Dear Mr. Hammric and Mr. Bradbume: Transmitted herewith are Final Findings and Orders of the Director concrrning the matter indicated above. Thomas E. Crepeau, Manager Data Management Section Division of Hazardous Waste Management cc: Michael Savage, Asst. Chief, DHWM Mark Navarre, Legal Supervisor Paul Pardi, DHWM, SWDO Dave Wertz, DHWM, NED0 Don Marshall, DHWM, SWDO Steve Hamlin, DHWM, SEDO

47

Fernald Environmental Management Project Director's Final Findings & Orders, December 27, 1994  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ohio Environmental Protection Agency Ohio Environmental Protection Agency 0.0. Box 163669,180O WaterMark Dr. dumbus, Ohio 43216-3669 '\ 644-3020 .X (614) 644-2329 December 27. 1994 Re: U.S. Department of Energy Fernald Environmental Management Project Attn: Jack Craig, Acting Site Manager P.O. Box 389705 Cincinnati, Ohio 45239 Fernald Environmental Restoration Management Corporation Attn: Don Ofte, President P.O. Box 538704 Cincinnati, Ohio 45253-8704 Dear Sirs: /---. ., ( 1 6454 c t f.. .: ,? I '; Lb.. i" _ && 't$oinovich Governor -., ._ . _ - --. .-....-. _ .___ WY. Director's Fina$Li&Xng.s,& Orders U.S. Department of Energy .-- +-_ Fernald-Environmental Restoration Management Corporation U.S. EPA ID No.: OH6890008976 CERTIFIED MAIL Transmitted herewith are Final Findings & Orders of the Director

48

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 AUGUST 2011 Table of Contents 1. Executive Summary .......................................................................................................... 1 2. Project Update .................................................................................................................. 2 a. Jobs and Economic Development ........................................................................................................... 5 b. Interconnection Studies ............................................................................................................................. 6 c. Routing and Public Outreach ................................................................................................................... 7

49

Operations Directorate (OPS Directorate)  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Directorate (OPS Directorate) Operations Directorate (OPS Directorate) Purpose A group chartered by the Associate Laboratory Director for the Advanced Photon Source that includes the responsible Division Directors and other appropriate APS operations personnel. The Operations Directorate collectively coordinates operating decisions that affect the facility as a whole and establishes both long- and short-term schedules, including scheduled maintenance and facility improvement periods. The Operations Directorate is the APS forum in which decisions regarding operations are discussed: These include, but are not limited to: Safety issues related to operations Operational Schedule Global operating parameters within the defined and approved operational and safety envelopes, such as energy, maximum circulating beam

50

Lyondell, Citgo join for heavy oil upgrade project at Houston refinery  

Science Conference Proceedings (OSTI)

Lyondell-Citgo Refining Co. Ltd. is beginning an $800-million upgrade and expansion of its Houston refinery. The project will enable the refinery. The project will enable the refinery to produce clean fuels while processing about 80% heavy, high-sulfur Venezuelan crude oil. The paper describes the Houston refinery, the expansion project, the technologies to be used, operational changes, environmental impacts, and construction.

Rhodes, A.K.

1994-03-21T23:59:59.000Z

51

Functional design criteria, Project W-059, B Plant Canyon ventilation upgrade  

SciTech Connect

This document outlines the essential functions and requirements to be included in the design of the proposed B Plant canyon exhaust system upgrade. The project will provide a new exhaust air filter system and isolate the old filters from the airstream.

Roege, P.E.

1995-03-02T23:59:59.000Z

52

Acceptance test report for project C-157 ``T-Plant electrical upgrade``  

Science Conference Proceedings (OSTI)

This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ``Acceptance Test Proceedure for Project C-157 `T Plant Electrical Upgrade``` The test was completed and approved without any problems or exceptions.

Jeppson, L.A.

1997-08-05T23:59:59.000Z

53

Work plan for upgrade of SY-101 Hydrogen Mitigation Test Project Data Acquisition and Control System (DACS-1)  

DOE Green Energy (OSTI)

The purpose of this effort is to upgrade the existing DACS-1 used for control and data acquisition in support of the hydrogen mitigation program for tank 101-SY. The planned upgrades will enhance the system capabilities to support additional mitigation projects and improve the system operability by implementing changes identified during operation of the system to date. Once the upgrades have been implemented, the DACS-1 system should operate as it did prior to the upgrade, but with greatly increased speed and capability. No retraining of Test Engineers will be required; the upgrade is designed to be transparent to those who operate it, with only a noticeable increase in the speed of the system. This work plan defines the tasks required for implementing the upgrade. It identifies deliverables, responsible organizations and individuals, interfaces, and schedule. This upgrade effort employs system engineering principles wherever applicable.

Truitt, R.W.

1994-08-01T23:59:59.000Z

54

Upgrade of Compressed Air Control System Reduces Energy Costs at Michelin Tire Plant. Office of Industrial Technologies (OIT) BestPractices Project Case Study  

Science Conference Proceedings (OSTI)

This case study highlights the upgraded compressed air system at a Michelin tire manufacturing plant in Spartanburg, South Carolina. The controls upgrade project enabled multiple compressor operation without blow-off, and significantly reduced energy costs.

Not Available

2002-01-01T23:59:59.000Z

55

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROJECT PROPOSAL PROJECT PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 JULY 2010 TABLE OF CONTENTS INTRODUCTION 1. The Challenge ....................................................................................................................................... 1 2. The Solution .......................................................................................................................................... 1 SECTION I: STATUTORY CRITERIA 1. General Description of the Entity ................................................................................................... 4 2. Project Description ............................................................................................................................. 5

56

The upgrade project for the RF system for the Brookhaven AGS  

SciTech Connect

The AGS operates a varied program of proton, heavy ion, and polarized proton acceleration for fixed-target experiments and will soon serve as the injector of these beams into the Relativistic Heavy Ion Collider, RHIC. The new Booster synchrotron extends the range of intensities and masses that can be accelerated. The 1.5 GeV injection energy increases the space charge limit by a factor of four to more than 6 {times} 10{sup 13} protons per pulse. To accommodate the increased beam current the rf system will be upgraded to provide more power and lower impedance to the beam. The flexibility of the rf system will also be enhanced by virtue of a new rf beam control system and installation of individual tuning servos for the ten rf cavities. The fundamental necessity for upgrading the rf system is to deliver more power to the accelerating beam. Three key ingredients of the upgrade project addressing this problem is (1) new power amplifiers provide the necessary power, and are closely coupled to the cavities, (2) wideband rf feedback reduces the effective impedance by a factor of 10, and (3) the capacitors loading the acceleration gaps (four per cavity) are increased from 275 pF to 600 pF.

Brennan, J.M.; Ciardullo, D.J.; Hayes, T.; Meth, M.; McNerney, A.J.; Otis, A.; Pirkl, W.; Sanders, R.; Spitz, R.; Toldo, F.; Zaltsman, A.

1993-06-01T23:59:59.000Z

57

Microsoft Word - WC_Digital_Communication_System_Upgrade_Project_CX_Update.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2013 5, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager -TEP-CSB-1 Proposed Action: Digital Communication System Upgrade Project: 'D' Analog System Retirement and #WC SONET Ring (update to previous Categorical Exclusion issued on February 22, 2013) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Microwave, meteorological, and radio towers Location: Douglas County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In addition to the work described in the previous Categorical Exclusion, BPA proposes to add a permanent gravel parking area next to the existing access road outside BPA's Columbia Substation. The new parking area would be used to

58

Conceptual design report, 219-S secondary containment upgrade, Project W-178  

Science Conference Proceedings (OSTI)

The 219-S Facility is located in the 200-West Area on the Hanford Site and was constructed in 1951. The facility receives and treats liquid, low-level mixed waste from the 222-S Laboratory prior to transfer of that waste to the SY Tank Farm. The 219-S Facility consists of Cell A containing Tanks 101 and 102 and Cell B containing Tank 103 and a spare space. Project W-178 will modify the 219-S Facility to bring it into compliance with the tank system standards in WAC 173-303-640. The secondary containment upgrade will consist of a stainless steel cell liner in both Cell A and the spare space in Cell B. Additionally, Cell B will be modified by taking Tank 103 out of service and installing a new tank: Tank 104. The construction work will be accomplished in phases to minimize service interruption to the 222-S Laboratory. The proposed design and construction method is the most cost effective of four alternatives evaluated during a value engineering session. Project W-178 is a fiscal year 1995 Line Item. Total estimated construction costs of the project are $2,600,000; other project costs are $710,000. The total project cost is $3,300,000.

Beyer, J.J. [Kaiser Engineers Hanford Co., Richland, WA (United States)

1993-05-01T23:59:59.000Z

59

B&W Y-12 names Carl Strock as UPF Project Director | Y-12 National...  

NLE Websites -- All DOE Office Websites (Extended Search)

is one of the most important construction projects our nation has embarked upon since the Manhattan Project," said Haynes. "Carl Strock's proven leadership and accomplishments make...

60

Executive Director  

NLE Websites -- All DOE Office Websites (Extended Search)

Executive Director Executive Director Rich Marquez, Executive Director, leads institutional initiatives and provides oversight for the Laboratory's organizations for Ethics and Audits, Prime Contract, Chief Financial Officer, Chief Information Officer, Ombuds, and Communications and Government Affairs. Contact Operator Los Alamos National Laboratory (505) 667-5061 Marquez has received a number of significant awards and recognitions, including the Presidential Rank Award for Meritorious Service. Rich Marquez Executive Director Rich Marquez, Executive Director Richard A. (Rich) Marquez currently serves Los Alamos National Laboratory as executive director reporting to the Laboratory director. Marquez leads institutional initiatives and provides oversight for several Laboratory organizations, including

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

62

Performance of First C100 Cryomodules for the CEBAF 12 GeV Upgrade Project  

Science Conference Proceedings (OSTI)

The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the project is a doubling of the available beam energy of CEBAF from 6 GeV to 12 GeV. This increase in beam energy will be due primarily to the construction and installation of ten "C100" cryomodules in the CEBAF linacs. The C100 cryomodules are designed to deliver an average 108 MV each from a string of eight seven-cell, electropolished superconducting RF cavities operating at an average accelerating gradient of 19.2 MV/m. The new cryomodules fit in the same available linac space as the original CEBAF 20 MV cryomodules. Cryomodule production started in September 2010. Initial acceptance testing started in June 2011. The first two C100 cryomodules were installed and tested from August 2011 through October 2011, and successfully operated during the last period of the CEBAF 6 GeV era, which ended in May 2012. This paper will present the results of acceptance testing and commissioning of the C100 style cryomodules to date.

Drury, Michael A. [JLAB; Burrill, Andrew B. [JLAB, Helmholtz-Zentrum Berlin fur Materialien und Energie GmbH; Davis, G. Kirk [JLAB; Hogan, John P. [JLAB; King, Lawrence [JLAB; Marhauser, Frank [JLAB; Park, HyeKyoung [JLAB; Preble, Joseph [JLAB; Reece, Charles E. [JLAB; Reilly, Anthony V. [JLAB; Rimmer, Robert A. [JLAB; Wang, Haipeng [JLAB; Wiseman, Mark A. [JLAB

2012-09-01T23:59:59.000Z

63

Request for Reduction/Waiver of F&A Principal Investigators /Project Directors must budget Facilities and Administrative (F&A) costs in all grant, contract, and  

E-Print Network (OSTI)

Allowed By Sponsor (if known) Project Budget: Reason for Reduction/Waiver Request: Direct Costs (MTDC BaseRequest for Reduction/Waiver of F&A Principal Investigators /Project Directors must budget Facilities and Administrative (F&A) costs in all grant, contract, and cooperative agreement proposals using

Guenther, Frank

64

Project Management Guidance when Upgrading Steam Turbines at Nuclear and Fossil Power Plants  

Science Conference Proceedings (OSTI)

Many power producers upgrade steam turbines to gain megawatts (MW) instead of installing new capacity for a variety of reasons. The engineering challenges encounteredwhen managing procurement and adequately analyzing plant support systems affected by this upgradeare becoming more pronounced.

2007-01-15T23:59:59.000Z

65

Recent results of the ATLAS Upgrade Planar Pixel Sensors R&D Project  

E-Print Network (OSTI)

The ATLAS detector has to undergo significant updates at the end of the current decade, in order to withstand the increased occupancy and radiation damage that will be produced by the high-luminosity upgrade of the Large Hadron Collider. In this presentation we give an overview of the recent accomplishments of the R&D activity on the planar pixel sensors for the ATLAS Inner Detector upgrade.

Giovanni Marchiori; for the ATLAS Upgrade PPS Collaboration

2011-09-14T23:59:59.000Z

66

Program Director/Principal Investigator (Last, First, Middle): BUDGET FOR ENTIRE PROPOSED PROJECT PERIOD  

E-Print Network (OSTI)

PROJECT PERIOD DIRECT COSTS ONLY BUDGET CATEGORY TOTALS INITIAL BUDGET PERIOD (from Form Page 4) 2nd organization only. CONSULTANT COSTS EQUIPMENT SUPPLIES TRAVEL INPATIENT CARE COSTS OUTPATIENT CARE COSTS ALTERATIONS AND RENOVATIONS OTHER EXPENSES DIRECT CONSORTIUM/ CONTRACTUAL COSTS SUBTOTAL DIRECT COSTS (Sum

Bandettini, Peter A.

67

Deputy Director  

NLE Websites -- All DOE Office Websites (Extended Search)

Deputy Director Deputy Director Laboratory Deputy Director Elizabeth Sellers has nearly 30 years of management experience leading the integration and improvement of large, complex, and technically diverse environments. Contact Operator Los Alamos National Laboratory (505) 667-5061 Sellers comes to the Laboratory with nearly 30 years of management experience working for the U.S. Department of Energy and private industry, leading the integration and improvement of large, complex, and technically diverse environments. Elizabeth Sellers Laboratory Deputy Director Deputy Director Elizabeth Sellers Elizabeth (Beth) Sellers joined Los Alamos National Laboratory as deputy director on December 5, 2011. Sellers comes to the Laboratory with nearly 30 years of management experience working for the U.S. Department of Energy and private industry,

68

Nuclear safety procedure upgrade project at USEC/MMUS gaseous diffusion plants  

SciTech Connect

Martin Marietta Utility Services has embarked on a program to upgrade procedures at both of its Gaseous Diffusion Plant sites. The transition from a U.S. Department of Energy government-operated facility to U.S. Nuclear Regulatory Commission (NRC) regulated has necessitated a complete upgrade of plant operating procedures and practices incorporating human factors as well as a philosophy change in their use. This program is designed to meet the requirements of the newly written 10CFR76, {open_quotes}The Certification of Gaseous Diffusion Plants,{close_quotes} and aid in progression toward NRC certification. A procedures upgrade will help ensure increased nuclear safety, enhance plant operation, and eliminate personnel procedure errors/occurrences.

Kocsis, F.J. III

1994-12-31T23:59:59.000Z

69

Director's Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Director's Office Director's Office Director's Office Print Roger Falcone Director, Advanced Light Source, Ernest Orlando Lawrence Berkeley National Laboratory and Professor of Physics, University of California, Berkeley. Roger Falcone Web page at the University of California, Berkeley Advanced Light Source Lawrence Berkeley National Laboratory 1 Cyclotron Road, MS 80R0114 Berkeley, CA 94720 USA Tel. (510) 486-6692 Fax (510) 486-4960 Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Roger Falcone, University of California, Berkeley physics professor and veteran ALS user, succeeded Janos Kirz as ALS Division Director on September 1, 2006. Dr. Falcone received his undergraduate degree in physics from Princeton University in 1974. He earned an M.S. and Ph.D. in

70

Fermilab | Directorate | Director Profiles | Jim Strait  

NLE Websites -- All DOE Office Websites (Extended Search)

Jim Strait Jim Strait LBNE Project Manager As the LBNE Project Manager, I have the overall responsibility and authority to execute the LBNE Project, and to meet the approved scientific, cost and schedule goals of the project. In this role, I lead and direct the development of the technical, cost and schedule baseline for the project and the construction of the project defined by the approved baseline. I also prepare for and establish management systems, consistent with DOE and Fermilab Project Management orders and structures, to ensure that the project is successfully executed. I also represent the Project in interactions with the LBNE collaboration, Fermilab management, management of other participating national laboratories, and the Department of Energy. As the LBNE project manager, I report to the laboratory director. I head

71

AN E&E PUBLISHING SERVICE ENERGY EFFICIENCY: Tenn. project to test range of residential upgrades  

E-Print Network (OSTI)

retrofits -- changes costing about $10 per square foot of living space, or $25,000 for an average home will not dominate the retrofit, though. "On a first-cost basis, the biggest thing we're doing is the insulation and ability to pay for, or get a loan for, the hefty upfront costs of making upgrades, and to give researchers

72

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana  

Energy.gov (U.S. Department of Energy (DOE))

This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations.

73

Beam Physics for the 12 GeV CEBAF Upgrade Project  

SciTech Connect

Beam physics aspects of the 12 GeV Upgrade of CEBAF are presented. The CEBAF Upgrade to 12 GeV is achieved via 5.5 recirculations through the linacs, and the installation of 10 new high-gradient cryomodules. A new experimental hall, Hall D, is envisioned at the end of North Linac. Simulation results for straight-through and recirculated injectors are summarized and compared. Beam transport designs are discussed and evaluated with respect to matching and beam breakup (BBU) optimization. Effects of synchrotron radiation excitation on the beam properties are calculated. BBU simulations and derived specifications for the damping of higher order modes of the new 7-cell cavities are presented. The energies that provide longitudinal polarization in multiple experimental halls simultaneously are calculated. Finally, a detailed optics design for the Hall D transport line has been obtained.

L. Merminga; J. F. Benesch; S.A. Bogacz; Y.-C. Chao; A. Freyberger; J.M. Grames; L. Harwood; R. Kazimi; G.A. Krafft; M. Spata; M. Tiefenback; M. Wiseman; B.C. Yunn; Y. Zhang

2005-05-16T23:59:59.000Z

74

Senior Director Project Management  

E-Print Network (OSTI)

(IG-13-003, November 15, 2012) The Office of Inspector General contracted with the independent public with the Government Accountability Office's Government Auditing Standards and the Office of Management and Budget section of NASA's FY 2012 Agency Financial Report for the Inspector General's transmittal letter and Pw

Ginzel, Matthew

75

Pleasant Prairie Power Plant air quality control upgrade project, Pleasant Praire, Wisconsin  

SciTech Connect

We Energies recently completed a multiyear project at its Pleasant Prairie Power Plant to add a selective catalytic reduction system to one of its two units and a scrubber to both. These projects are described. 7 figs., 1 tab.

Gebhart, S.; Pennline, D.; Brodsky, I.; Bichler, D. [Washington Group International (United States)

2007-10-15T23:59:59.000Z

76

NNSA¬źs Management of the $245 million Nuclear Materials Safeguards and Security Upgrades Project Phase II at Los Alamos National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NNSA's Management of the $245 NNSA's Management of the $245 Million Nuclear Materials Safeguards and Security Upgrades Project Phase II DOE/IG-0901 January 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 January 2, 2014 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Special Report on "NNSA's Management of the $245 million Nuclear Materials Safeguards and Security Upgrades Project Phase II at Los Alamos National Laboratory" BACKGROUND The National Nuclear Security Administration's Los Alamos National Laboratory (LANL) is responsible for the protection and control of a significant portion of the Nation's special nuclear

77

Conceptual design letter report for project W-454, AW jumper manifold upgrade  

SciTech Connect

This Conceptual Design Letter Report provides details on the activities required to be performed for this project and also provides cost estimates and schedules for those activities.

Mattichak, R.W., Westinghouse Hanford

1996-06-12T23:59:59.000Z

78

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Western Area Power Administration Fort Collins 115-kV Transmission Line Upgrade Project, Fort Collins, Colorado. AGENCY: Western Area Power Administration, DOE ACTION: Finding of no significant impact SUMMARY: The Department of Energy (DOE), Western Area Power Administration (Western) is the lead federal agency for a proposed project to upgrade the electric transmission system in the Fort Collins, Colorado area. Platte River Power Authority (Platte River) is proposing to add additional generation at its Rawhide Power Plant, to rebuild and upgrade segments of Western's existing Flatiron-Poudre and Poudre-Richard's Lake 115-kilovolt (kV) transmission lines, and to install additional 230 kV transmission to Platte River's existing electrical system. Western prepared an environmental assessment (EA) titled "Fort Collins 115kV Transmission

79

Fermilab | Directorate | Director Profiles | Robert Kephart  

NLE Websites -- All DOE Office Websites (Extended Search)

Robert Kephart Robert Kephart IARC Director/SRF Program Manager As the Director of the Illinois Accelerator Research Center (IARC) at Fermilab my goal is to bridge the gap between breakthroughs in accelerator science and technology and solutions for society. IARC will allow our university and laboratory partners to leverage Fermilab's extensive accelerator infrastructure and expertise, resulting in new accelerator-based products and businesses in the United States. I proposed and lead a construction project funded by the U.S. Department of Energy and the State of Illinois to build a new complex valued at $70 million to support the IARC mission on the Fermilab campus. I manage the superconducting radio frequency (SRF) technology program, a $30 million-a-year research and development effort that supports a proposed new

80

LLNL Director Search  

NLE Websites -- All DOE Office Websites (Extended Search)

Integration Directorate Lawrence Livermore National Laboratory John Edwards Associate NIF Director for ICF & HED NIF & Photon Science Directorate Lawrence Livermore National...

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR THE FORT COLLINS 115kV TRANSMISSION LINE UPGRADE PROJECT Prepared for: Platte River Power Authority and U.S. Department of Energy Western Area Power Administration DOE/EA 1354 September 2001 i TABLE OF CONTENTS SUMMARY ............................................................................................................... S-1 1.0 INTRODUCTION ...............................................................................................1-1 1.1 DESCRIPTION OF PROPOSED PROJECT .................................................................. 1-1 1.3 PURPOSE OF ENVIRONMENTAL ASSESSMENT....................................................

82

Assistant Director Office of the Treasurer  

E-Print Network (OSTI)

Director Bob Barto Sr. Inspector Doug McGinnis Sr. Inspector George Levinthal Project Manager Jeff Enge Sr. Inspector Mark Peppers Project Manager Peter Ryan Sr. Inspector Rick Whitehead Sr. Inspector Tom Haas Sr. Inspector Ray Aronson Associate Director Daniel Belding Project Manager Anne-Marie Nething Analyst 1 Dan

Indiana University

83

GENII (Generation II): The Hanford Environmental Radiation Dosimetry Software System: Volume 3, Code maintenance manual: Hanford Environmental Dosimetry Upgrade Project  

Science Conference Proceedings (OSTI)

The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). This coupled system of computer codes is intended for analysis of environmental contamination resulting from acute or chronic releases to, or initial contamination of, air, water, or soil, on through the calculation of radiation doses to individuals or populations. GENII is described in three volumes of documentation. This volume is a Code Maintenance Manual for the serious user, including code logic diagrams, global dictionary, worksheets to assist with hand calculations, and listings of the code and its associated data libraries. The first volume describes the theoretical considerations of the system. The second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. 7 figs., 5 tabs.

Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

1988-09-01T23:59:59.000Z

84

GENII: The Hanford Environmental Radiation Dosimetry Software System: Volume 2, Users' manual: Hanford Environmental Dosimetry Upgrade Project  

Science Conference Proceedings (OSTI)

The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). The purpose of this coupled system of computer codes is to analyze environmental contamination of, air, water, or soil. This is accomplished by calculating radiation doses to individuals or populations. GENII is described in three volumes of documentation. This second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. The first volume describes the theoretical considerations of the system. The third volume is a Code Maintenance Manual for the user who requires knowledge of code detail. It includes logic diagrams, global dictionary, worksheets, example hand calculations, and listings of the code and its associated data libraries. 27 refs., 17 figs., 23 tabs.

Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

1988-11-01T23:59:59.000Z

85

Fermilab | Directorate | Director Profiles | Carl Strawbridge  

NLE Websites -- All DOE Office Websites (Extended Search)

Carl Strawbridge Carl Strawbridge Interim Head, Integrated Planning & Performance Management I head the Office of Integrated Planning & Performance Management (IPPM), which supports the sectors and the Directorate. The office of IPPM provides systems and management processes for institutional planning and performance assessment and evaluation, as well as leading multi-year, forward-looking planning and integration of institutional plans, programs, projects, operations and budgets. In addition the office of IPPM develops, implements and maintains integrated laboratory systems and management processes for strategic planning and goal setting, project and program oversight, enterprise risk management and performance planning and oversight. I received my B.S. degree from the US Naval Academy and Masters Degrees

86

Beam director design report  

Science Conference Proceedings (OSTI)

A design and fabrication effort for a beam director is documented. The conceptual design provides for the beam to pass first through a bending and focusing system (or ''achromat''), through a second achromat, through an air-to-vacuum interface (the ''beam window''), and finally through the vernier steering system. Following an initial concept study for a beam director, a prototype permanent magnet 30/sup 0/ beam-bending achromat and prototype vernier steering magnet were designed and built. In volume II, copies are included of the funding instruments, requests for quotations, purchase orders, a complete set of as-built drawings, magnetic measurement reports, the concept design report, and the final report on the design and fabrication project. (LEW)

Younger, F.C.

1986-08-01T23:59:59.000Z

87

Executive Director  

E-Print Network (OSTI)

Dear Dr. Boulton, As you may know, ďWorkforce Ē is the first of the six priorities listed in APHLís current (2010-2013) and previous (2006-2009) Strategic Plans. A crucial strength of our Associationís ongoing Workforce Development Program is multi-component workforce research. Over the past two years access to support provided by the University of Michiganís Center of Excellence for Public Health Workforce Studies has greatly accelerated this research program. We are most grateful to the Center and you personally for undertaking the initial characterization of the public health, environmental, and agricultural laboratory (PHEAL) workforce, an undertaking that has provided an excellent assessment and a solid base on which to build future PHEAL workforce research and products needed to expand the PHEAL workforce pipeline. Thank you for forwarding the final draft of the National Laboratory Capacity Assessment. This collaborative initiative has resulted in a summary document rich with information that has provided an exceptional profile of our public health, environmental, and agricultural laboratories. On behalf of the Workforce Development Committee and the APHL Board of Directors, we extend our appreciation for a truly productive and effective collaboration. Lastly, we hope that

Matthew L. Boulton; Scott J. Becker; Jack Deboy Drph

2012-01-01T23:59:59.000Z

88

LLNL Director Search  

NLE Websites -- All DOE Office Websites (Extended Search)

News "Search process for Lawrence Livermore director, LLNS president gets under way," LLNS news release, Nov. 25, 2013. "Parney Albright steps down as Laboratory director, Bret...

89

Independent directors in China.  

E-Print Network (OSTI)

??This thesis examines the development of the independent director system in China. The newly introduced independent director system is viewed as a revolutionary change toÖ (more)

Ma, Lijun

2009-01-01T23:59:59.000Z

90

LLNL Director Search  

NLE Websites -- All DOE Office Websites (Extended Search)

LLNL DIRECTOR SEARCH Home Lawrence Livermore National Laboratory LLNL DIRECTOR SEARCH Position Description About LLNL News Questions and Answers THE PROCESS Nomination and...

91

TO: Procurement Directors/Contracting Officers FROM: Director  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DATE: October 30 , 2013 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Continuing Appropriations Act, 2014 -- Congressional Notification of Pending Contract or Financial Assistance Actions in excess of $1 Million under the Continuing Resolution SUMMARY: Section 101(a)(6) of the Continuing Appropriations Resolution Act, 2014, Pub. L No. 113-46, makes appropriations available through January 15, 2014 for continuing projects or activities that were conducted under Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6, under the same authority and conditions. Therefore, the Section 311

92

Deputy Director  

E-Print Network (OSTI)

(Commission). It does not necessarily represent the views of the Commission, its employees, or the State of California. The Commission, the State of California, its employees, contractors, and subcontractors make no warranty, express or implied, and assume no legal liability for the information in this report; nor does any party represent that the use of this information will not infringe upon privately owned rights. This report has not been approved or disapproved by the Commission nor has the Commission passed upon the accuracy or adequacy of this information in this report. i Acknowledgements Tom Cade of the Peregrine Fund conceived of this project and provided advice and encouragement throughout. Dick Anderson and Linda Spiegel of the California Energy Commission provided valuable support and assistance throughout the project. We thank Peter Law and Alan Franklin for mathematical and statistical assistance. Chris Gill performed GIS mapping and data organization. Hans Peeters supplied information on nests, productivity and behavior of golden eagles in the study region. Wally Erickson, Bryan Manly, Dale Strickland, and an anonymous reviewer provided valuable comments and insight.

Grainger Hunt; Kelly Birkinshaw; Richard Anderson

2002-01-01T23:59:59.000Z

93

Department of Energy Names Director for Office of Indian Energy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Names Director for Office of Indian Energy Policy and Makes Available 2 Million for Clean Energy Projects on Tribal Lands Department of Energy Names Director for Office of Indian...

94

TO: Procurement Directors/Contracting Officers FROM: Director  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 DATE: January15, 2014 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Determination of Benchmark Compensation Amount for Certain Executives and Employees (Update) SUMMARY: The purpose of this Flash is to update Policy Flash 2014-12 issued on December 28, 2013 to reflect the current Executive Compensation Cap pursuant to the Bipartisan Budget Act of 2013 (H.J.Res. 59) which was signed into law on December 26, 2013. The provision in Section 702 - "Limitation on allowable government contractor compensation costs"- limits how much a contractor could charge the federal government for an

95

Fermilab | Directorate | Director Profiles | Steve Geer  

NLE Websites -- All DOE Office Websites (Extended Search)

Steve Geer Steve Geer Head, Program Planning Office I am currently Head of the Program Planning Office within the Fermilab Directorate, which coordinates the experimental physics program carried out at the Laboratory. The office provides a link between ongoing and planned experiments and the Directorate, by: Acting as liaison between experimenters and laboratory staff regarding beam conditions during accelerator operation. Establishing priorities between accelerator studies and experiments and among experiments, in consultation with the Director, and resolving conflicting requests from experiments. Coordinating Division and Section reviews of draft Memoranda of Understanding for approved experiments. Coordinating updates to the "Procedures for Researchers" which

96

Weights and Measures State Directors  

Science Conference Proceedings (OSTI)

*. Bookmark and Share. State Director's List. Alaska. Dan K. Breeden, Director. AK Division of Measurement Standards/CVE. ...

2010-10-05T23:59:59.000Z

97

Director | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Director Director Project Assessment (OPA) OPA Home About Director Staff & Responsibilities Location Project Management SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov About Director Print Text Size: A A A RSS Feeds FeedbackShare Page Click to enlarge photo. Enlarge Photo Daniel R. Lehman Daniel R. Lehman has served as Director of the Office of Project Assessment since June 1991. The majority of Mr. Lehman's over 30 years of Federal Service has been served within the Office of Science (formerly Energy Research). Mr. Lehman's key responsibilities include:

98

Meet Assistant Director Jeff Given | OSTI, US Dept of Energy...  

Office of Scientific and Technical Information (OSTI)

Director for Information Systems and focuses on collaborative technical project management in such cross-cutting areas as cyber security, networking, server and database...

99

Meet Assistant Director Mark Martin | OSTI, US Dept of Energy...  

Office of Scientific and Technical Information (OSTI)

Assistant Director Mark Martin brings extensive experience in information program management, information security, enterprise web service development, and project management to...

100

f. program director  

Science Conference Proceedings (OSTI)

Committee, one year in advance of assuming office. ... The Program Director holds office for three ... Has successful experience in managing a budget.

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Nuclear & Particle Physics Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

at RHIC or the AGS should be submitted to the Associate Laboratory Director for Nuclear and Particle Physics, presently Steve Vigdor, Bldg. 510F, Brookhaven National...

102

Nuclear & Particle Physics Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

NSAC Meeting, Bethesda, Maryland: 3-5 April 2005 US Nuclear Science web site (link to meeting) Brookhaven Presentations: Director's Remarks: Praveen Chaudhari Overview: Sam Aronson...

103

Nuclear & Particle Physics Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear & Particle Physics Directorate Nuclear and Particle Physics (NPP) at BNL comprises the Collider-Accelerator Department (including the NASA Space Radiation Laboratory,...

104

c. content director  

Science Conference Proceedings (OSTI)

Seeking approval and/or informing the Board of content development and ... Present oral and written reports to the Board of Directors on the status of those.

105

LLNL Director Search  

NLE Websites -- All DOE Office Websites (Extended Search)

Search Committee Search Committee for the selection of a director for Lawrence Livermore National Laboratory November 2013 * Additional members are under consideration. Norman...

106

Fermilab | Directorate | Director Profiles | Nigel Lockyer  

NLE Websites -- All DOE Office Websites (Extended Search)

Nigel Lockyer Nigel Lockyer Laboratory Director Nigel Lockyer began his tenure as director of Fermi National Accelerator Laboratory, America’s premier laboratory for particle physics research, on September 3, 2013. An experimental particle physicist, Lockyer was most recently director of TRIUMF, Canada’s national laboratory for particle and nuclear physics. He was also a professor of physics and astronomy at the University of British Columbia. Under his leadership, TRIUMF formulated a vision for ascending the world stage in nuclear physics using rare-isotope beams to address some of the most fundamental questions in science. Lockyer expanded the laboratory’s operations by 25 percent, earning a reputation as a national leader and team-builder. He also developed a strong working partnership among

107

Fermilab | Directorate | Director Profiles | Martha Michels  

NLE Websites -- All DOE Office Websites (Extended Search)

Martha Michels Martha Michels Director for ESH&Q and Head of the ESH&Q Section As the Director for ESH&Q and Head of the ESH&Q Section, Michels is responsible for the management and direction of Fermi National Accelerator Laboratory’s environment, safety and health programs. She ensures that ESH&Q is integrated into all activities within the line organizations in an effective and efficient manner. Michels assists the Directorate in assessing the resource needs and priorities of the Laboratory concerning ESH&Q. She represents the lab on ESH&Q issues with the Department of Energy, government and non-government agencies and other national laboratories. Michels owns the ESH&Q Management System, which establishes and maintains ESH&Q policies and procedures. She assesses line organizations for

108

TO: Procurement Directors FROM: Director, Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 DATE: April 14, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: DOE 2011 Continuity of Operations (COOP) Awareness Briefing Available to Contractors SUMMARY: For each contract requiring or involving responsibility for work or operations at DOE/NNSA sites or facilities that support or perform essential functions/activities that directly support National Essential Functions (NEF), Mission Essential Functions (MEF), Primary Mission Essential Functions (PMEF), or Essential Supporting Activities (ESA) the Contractor Requirements Document (CRD) DOE Order 150.1, Continuity Programs, sets forth the contractor responsibility for a Continuity of

109

MEMORANDUM FOR FEDERAL PROCUREMENT DIRECTORS FROM: DIRECTOR  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 2009 MEMORANDUM FOR FEDERAL PROCUREMENT DIRECTORS FROM: DIRECTOR OFFICE OF PROCUREMENT AND ASSISTANCE MANAGEMENT SUBJECT: Changes to the Balanced Scorecard Program The Balanced Scorecard (BSC) performance management methodology has played a significant role in helping the Office of Procurement and Assistance Management assess the performance of the Department's Federal procurement offices and the purchasing organizations of its major site and facility contractors. This methodology provides the conceptual framework for creating, communicating, collecting and arraying performance objectives, measures, targets, and initiatives. Over the years, we have used the BSC assessment results to identify and monitor desired organizational changes, to expose problem areas needing management attention, to

110

Director`s series on proliferation  

SciTech Connect

The Director`s Series on Proliferation is an occasional publication of essays on the topics of nuclear, chemical, biological, and missile proliferation. The seven papers presented in this issue cover the following topics: Should the Treaty on the Nonproliferation of Nuclear Weapons (NPT) be amended?; NPT extension - Legal and procedural issues; An Indonesian view of NPT review conference issues; The treaty of Tlatelolco and the NPT - Tools for peace and development; Perspectives on cut-off, weapons dismantlement, and security assurances; Belarus and NPT challenges; A perspective on the chemical weapons convention - Lessons learned from the preparatory commission.

Bailey, K.C.; Price, M.E. [eds.

1994-12-27T23:59:59.000Z

111

Energy Efficiency Upgrades  

Science Conference Proceedings (OSTI)

The energy efficiency upgrades project at Hardin County General Hospital did not include research nor was it a demonstration project. The project enabled the hospital to replace outdated systems with modern efficient models. Hardin County General Hospital is a 501c3, nonprofit hospital and the sole community provider for Hardin and Pope Counties of Illinois. This project provided much needed equipment and facility upgrades that would not have been possible through locally generated funding. Task 1 was a reroofing of the hospital. The hospital architect designed the replacement to increase the energy efficiency of the hospital roof/ceiling structure. Task 2 was replacement and installation of a new more efficient CT scanner for the hospital. Included in the project was replacement of HVAC equipment for the entire radiological suite. Task 5 was a replacement and installation of a new higher capacity diesel-fueled emergency generator for the hospital replacing a 50+ year old gas-fired generator. Task 7 was the replacement of 50+ year-old walk-in cooler/freezer with a newer, energy efficient model. Task 8 was the replacement of 10+ year-old washing machines in the hospital laundry with higher capacity, energy efficient models. Task 9 was replacement of 50-year old single pane curtain window system with double-pane insulated windows. Additionally, insulation was added around ventilation systems and the curtain wall system.

Roby Williams

2012-03-29T23:59:59.000Z

112

TO: Procurement Directors FROM: Director, Contracts and Financial...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Directors FROM: Director, Contracts and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: DOE O 580.1A...

113

2013 Director's New Year Address  

NLE Websites -- All DOE Office Websites (Extended Search)

Director's New Year Address 2013 Director's New Year Address Print Looking Forward and Celebrating 20 Years in 2013 falocne We recently sat down with ALS Director Roger Falcone to...

114

TO: Procurement Directors FROM: Director, Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DATE: April 7, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Publication of Federal Acquisition Circular 2005-51 SUMMARY: Attached for your information is a summary of Federal Acquisition Circular 2005-51 which makes two changes to the Federal Acquisition Regulation involving the small business program and a modification of Standard Form 26. This Flash and its attachment will be available online within a day, at the following website: http://www.management.energy.gov/policy_guidance/policy_flashes.htm. Federal Acquisition Circulars may be found, in both their Federal Register notice form and in loose leaf form at: https://www.acquisition.gov/far/.

115

TO: Procurement Directors FROM: Director, Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2011-56 POLICY FLASH 2011-56 DATE: March 16, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Publication of Federal Acquisition Circular 2005-50 SUMMARY: Attached for your information is a summary of Federal Acquisition Circular 2005-50 which makes miscellaneous changes to the Federal Acquisition Regulation. We are reviewing Item II for possible changes we may need to make in DOE Acquisition Guide Chapter 38. This Flash and its attachment will be available online within a day, at the following website: http://www.management.energy.gov/policy_guidance/policy_flashes.htm. Federal Acquisition Circulars may be found, in both their Federal Register notice form

116

TO: Procurement Directors FROM: Director, Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 DATE: May 18, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Guide Chapter 8.4 - Federal Supply Schedules and Chapter 16.5 - Multiple-award Contracts and Governmentwide Acquisition Contracts Including Delivery Orders and Task Orders SUMMARY: Acquisition Guide Chapters 8.4 - Federal Supply Schedules and 16.5 - Multiple- Award Contracts and Governmentwide Acquisition Contracts Including Delivery Orders and Task Orders replace Chapter 38.1 Strategic Acquisition Transactions. The new chapters include revisions from Federal Acquisition Circular (FAC) 2005-50 to Federal Acquisition Regulation (FAR) Subparts 8.4 and 16.5.

117

TO: Procurement Directors FROM: Director, Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

83 83 DATE: June 15, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Guide Chapter 8.4 - Federal Supply Schedules SUMMARY: Acquisition Guide Chapters 8.4 - Federal Supply Schedules is revised to provide guidance on how to issue a request for quotation and receive quotes when using e-Buy. STRIPES is DOE's repository for all acquisition and financial assistance actions. As such, all requests for quotation (RFQ) should be issued and quotes received through STRIPES/FedConnect and not e-Buy. In lieu of uploading the RFQ to e-Buy, contracting officers will post a file that instructs FSS holders to go to www.FedConnect.net to locate the

118

TO: Procurement Directors FROM: Director, Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

40 40 DATE: February 9, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Issue a New Department of Energy Acquisition Guide Chapter 6.5 Competition Advocate Responsibilities and Revise Pages in Chapters 6.1 and 7.1. SUMMARY: Attached is a new chapter of the DOE Acquisition Guide entitled Competition Advocate Responsibilities. It provides a comprehensive overview of the topic. The new chapter necessitates page changes to Chapters 6.1 and 7.1. Chapter 6.1 has been revised to advise the contracting officer that for actions less than $650,000, the contracting officer is highly encouraged to have the Contracting Activity Competition Advocate review

119

Biosciences Division Seeking New Director  

NLE Websites -- All DOE Office Websites (Extended Search)

Director Search DOE Logo Search BIO ... Search Argonne Home > BIO home > Biosciences Division Seeking New Director BIO Home Page About BIO News Releases Research Publications...

120

PNNL: About PNNL - Director's Message  

NLE Websites -- All DOE Office Websites (Extended Search)

Director Michael Kluse, Laboratory Director At Pacific Northwest National Laboratory (PNNL), we are transforming the world through courageous scientific discovery and innovation....

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Directorate Organization | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

ORNL Neutron Sciences Directorate The Neutron Sciences Directorate (NScD) manages and operates the Spallation Neutron Source and the High Flux Isotope Reactor, two of the world's...

122

Fermilab | Fermilab Director Search | Home  

NLE Websites -- All DOE Office Websites (Extended Search)

Feature photo Fermilab Director Search In October 2012, the Board of Directors of the Fermi Research Alliance, LLC appointed a committee to conduct an international search for the...

123

From the Director  

NLE Websites -- All DOE Office Websites (Extended Search)

From the Director From the Director From the Director LANL's mission is to develop and apply science and technology to ensure the safety, security, and reliability of the U.S. nuclear deterrent; reduce global threats; and solve other emerging national security and energy challenges. Contact Operator Communications & Government Affairs (505) 667-7000 Our people are highly trained, creative, and innovative. They have one-of-a-kind facilities to accomplish work that very few people in the world can do. We have a vibrant student and postdoctoral program because they are the talent who will solve the problems our predecessors only dreamed of. Director's message Charles McMillan Los Alamos National Laboratory has played a role in some of the most transformational discoveries of the 20th and 21st centuries.

124

Thomas Reddinger Director, Steam  

E-Print Network (OSTI)

(Distribution) Deborah Moorhead Office Coordinator III Martin Bower Steam Plant Operator Richard Redfield SteamThomas Reddinger Director, Steam Operations Steven Richards Assistant Manager of Maintenance Plant Operator Bohdan Sawa Steam Plant Operator Robert Tedesco Steam Plant Operator James Bradley

Raina, Ramesh

125

LLNL Director Search  

NLE Websites -- All DOE Office Websites (Extended Search)

Search Process As agreed among the LLNS partners, the University of California is responsible for leading the search for the next LLNL Director. UC-appointed Chairman of the LLNS...

126

Photon Sciences | About the Photon Sciences Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

About the Photon Sciences Directorate About the Photon Sciences Directorate The Photon Sciences Directorate operates the National Synchrotron Light Source (NSLS) and is constructing the National Synchrotron Light Source II (NSLS-II), both funded by the Department of Energy Office of Science. These facilities support a large community of scientists using photons (light) to carry out research in energy and environmental sciences, physics, materials science, chemistry, biology and medicine. NSLS National Synchrotron Light Source NSLS-II National Synchrotron Light Source II This is a very exciting period for photon sciences at Brookhaven Lab and a time of unprecedented growth for the directorate. The NSLS-II Project is progressing rapidly and smoothly through design and construction, driven by

127

Nuclear & Particle Physics Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

A: Accelerator Operations, Upgrades and R&D 09:00 Accelerator performance analysis F. Pilat (20+10) 09:30 Stochastic cooling status and plans M. Brennan (20+10) 10:00 56 MHz SRF...

128

Tenneco upgrades natural gasoline  

SciTech Connect

Tenneco Oil Co. recently completed a natural gasoline upgrading project at its LaPorte, Tex., facility. The project was started in October 1985. The purpose was to fractionate natural gasoline and isomerize the n-pentane component. Three factors made this a particularly attractive project for the LaPorte complex: 1. The phase down of lead in gasoline made further processing of natural gasoline desirable. 2. Idle equipment and trained personnel were available at the plant as a result of a switch of Tenneco's natural gas liquids (NGL) fractionation to its Mont Belvieu, Tex., facility. 3. The plant interconnects with Houston's local markets. It has pipelines to Mont Belvieu, Texas City, and plants along the Houston Ship Channel, as well as truck, tank car, and barge-loading facilities. Here are the details on the operation of the facilities, the changes which were required to enable the plant to operate successfully, and how this conversion was completed in a timely fashion.

O'Gorman, E.K.

1986-08-01T23:59:59.000Z

129

Ongoing Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Current Projects Current Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated November 2013) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov Project Construction Photos Current Projects Print Text Size: A A A RSS Feeds FeedbackShare Page Photos of current SC Projects 12 GeV CEBAF Upgrade .pdf file (3.2MB) Daya Bay .pdf file (1.0MB) National Spherical Torus Experiment (NSTX) .pdf file (841KB) National Synchrotron Light Source II (NSLS II) .pdf file (6.4MB)

130

Recharge Elec. Upgrade Type  

E-Print Network (OSTI)

battery can be plugged in to an electric outlet to be recharged. Background: PHEVs 1. How many U" cost) · Variety of upgrade packages selected--some with zero upgrades · Most popular upgrade" Price Scenario ("home recharges" only) · "Base" PHEV=$3,000 premium · Added costs for upgrades (Full

California at Davis, University of

131

Chapter 4, Small Commercial and Residential Unitary and Split System HVAC Cooling Equipment-Efficiency Upgrade Evaluation Protocol: The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Small Commercial 4: Small Commercial and Residential Unitary and Split System HVAC Cooling Equipment-Efficiency Upgrade Evaluation Protocol David Jacobson, Jacobson Energy Research Subcontract Report NREL/SR-7A30-53827 April 2013 The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures 4 - 1 Chapter 4 - Table of Contents 1 Measure Description .............................................................................................................. 2 2 Application Conditions of Protocol ....................................................................................... 3 2.1 Programs with Enhanced Measures ................................................................................. 5 3 Savings Calculations .............................................................................................................. 6

132

Financing Energy Upgrades for K-12 School Districts  

NLE Websites -- All DOE Office Websites (Extended Search)

Financing Energy Upgrades for K-12 School Districts Financing Energy Upgrades for K-12 School Districts Page 2 Table of Contents Introduction................................................................................................................................................................................................................... 4 What This Guide Covers .................................................................................................................................................................................. 6 Chapter 1: Principles of Financing Energy Upgrades for Schools .................................................................................................. 7 Principle 1. Start with Clear Project Objectives.......................................................................................................................................... 7

133

Results of the Association of Directors of Radiation Oncology Programs (ADROP) Survey of Radiation Oncology Residency Program Directors  

Science Conference Proceedings (OSTI)

Purpose: To survey the radiation oncology residency program directors on the topics of departmental and institutional support systems, residency program structure, Accreditation Council for Graduate Medical Education (ACGME) requirements, and challenges as program director. Methods: A survey was developed and distributed by the leadership of the Association of Directors of Radiation Oncology Programs to all radiation oncology program directors. Summary statistics, medians, and ranges were collated from responses. Results: Radiation oncology program directors had implemented all current required aspects of the ACGME Outcome Project into their training curriculum. Didactic curricula were similar across programs nationally, but research requirements and resources varied widely. Program directors responded that implementation of the ACGME Outcome Project and the external review process were among their greatest challenges. Protected time was the top priority for program directors. Conclusions: The Association of Directors of Radiation Oncology Programs recommends that all radiation oncology program directors have protected time and an administrative stipend to support their important administrative and educational role. Departments and institutions should provide adequate and equitable resources to the program directors and residents to meet increasingly demanding training program requirements.

Harris, Eleanor [Department of Radiation Oncology, H. Lee Moffitt Cancer Center and Research Institute, Tampa, FL (United States)], E-mail: Eleanor.Harris@moffitt.org; Abdel-Wahab, May [Department of Radiation Oncology, University of Miami, Miami, FL (United States); Spangler, Ann E. [Moncrief Radiation Oncology Center, University of Texas Southwestern Medical Center, Dallas, TX (United States); Lawton, Colleen A. [Department of Radiation Oncology, Medical College of Wisconsin, Milwaukee, WI (United States); Amdur, Robert J. [Department of Radiation Oncology, University of Florida Shands Cancer Center, Gainesville, FL (United States)

2009-06-01T23:59:59.000Z

134

Thomas Reddinger Director, Steam  

E-Print Network (OSTI)

Supervisor (Distribution) Deborah Moorhead Office Coordinator III Martin Bower Steam Plant Operator RichardThomas Reddinger Director, Steam Operations Steven Richards Assistant Manager of Maintenance Redfield Steam Plant Operator SU Steam Station/Chilled Water Plant Bohdan Sawa Steam Plant Operator Robert

McConnell, Terry

135

EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Field Sites Power Marketing Administration Other Agencies You are here Home EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho...

136

FRN Request for Proposals for New or Upgraded Transmission Line...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 AGENCY:...

137

Principal Associate Director - Global Security  

NLE Websites -- All DOE Office Websites (Extended Search)

Principal Associate Director - Global Security Principal Associate Director - Global Security As Principal Associate Director for Global Security, Wallace leads Laboratory programs with special focus on developing and applying the scientific and engineering capabilities to address complex national and global security threats. Contact Operator Los Alamos National Laboratory (505 667-5061 Wallace's expertise is forensic seismology, a highly specialized discipline focusing on detection and quantification of nuclear tests. Terry C. Wallace, Jr. Principal Associate Director for Global Security Terry C. Wallace, Jr., Principal Associate Director for Global Security As Principal Associate Director for Global Security, Wallace leads Laboratory programs with a focus on applying scientific and engineering capabilities

138

Environment, Safety & Health Directorate Assistant Laboratory Director (ALD)  

E-Print Network (OSTI)

Environment, Safety & Health Directorate Assistant Laboratory Director (ALD) Environmental Division (4) Matrixed from Safety & Health Services Division (5) Matrixed from Procurement & Property Procurement Support (5) D&D Manager Work Control Manager Safety & Health Manager (4) Facility Configuration

Homes, Christopher C.

139

APS Upgrade | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Workshop on new science opportunities provided by a multi-bend achromat lattice at the APS APS-U MBA Lattice Workshop Registration is now closed. Please contact Diane Wilkinson ext. 7810 or a member of the Workshop Organizing Committee for changes or modifications to your registration. Submit Comments, Suggestions, and Ideas for MBA Lattice Workshop October 21-22 Advanced Photon Source Argonne National Lab The Advanced Photon Source Upgrade is focused on delivering a powerful, versatile facility for science using high-brightness, high-energy X-rays. At APS, and around the light source community, scientists have been developing storage ring designs that push closer to the ultimate diffraction limit for X-ray sources. A recent report by the Basic Energy Sciences Advisory Committee, which advises the Director of the U.S.

140

DOE/EIS-0169-SA-04: Supplement Analysis for Yakima Fisheries Project--Construction/modification upgrades to the Prosser Hatchery and the Marion Drain Hatchery Facilities (11/7/00)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 7, 2000 November 7, 2000 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for Yakima Fisheries Project, (DOE/EIS-0169-SA-04) memorandum David Byrnes Project Manager - KEWN-4 TO : Proposed Action: Yakima Fisheries Project - Construction/modification upgrades to the Prosser Hatchery and the Marion Drain Hatchery facilities. Project No.: F3204 Location: Prosser and Toppenish, Yakima County, Washington. Proposed by: Bonneville Power Administration (BPA) and Co-Managed by the Yakama Nation (YN) and the Washington Department of Fish and Wildlife (WDFW). 1. Introduction The Bonneville Power Administration is funding ongoing studies, research, and artificial production of several salmonid species in the Yakima and Klickitat river basins. BPA analyzed

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

About Berkeley Lab: Laboratory Director, Associate Laboratory...  

NLE Websites -- All DOE Office Websites (Extended Search)

2009, replacing former laboratory Director Steve Chu, who was sworn in as U.S. Energy Secretary. Before becoming interim director, Alivisatos was the deputy director of Berkeley...

142

ORNL Neutron Sciences Directorate Executive Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Neutron Sciences Directorate Executive Office Kelly Beierschmitt ORNL Associate Laboratory Director for Neutron Sciences Kelly Beierschmitt. The Neutron Sciences Directorate (NScD)...

143

Global and Regional Solutions Directorate  

E-Print Network (OSTI)

at Pacific NW National Lab (PNNL) ­ Founding Director Joint Global Change Research Institute (PNNL/UMd) ­ ALD (PNNL) ­ Environmental and Health Sciences Directorate; Emerging Technologies ­ Chief Scientist ­ Atmospheric Radiation Measurement Program ­ Director ­ PNNL Global Studies Program ­ Other (PNNL): Center

Homes, Christopher C.

144

Energy Innovation Hub Directors Visit the Hill | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Innovation Hub Directors Visit the Hill Energy Innovation Hub Directors Visit the Hill Energy Innovation Hub Directors Visit the Hill April 24, 2013 - 5:39pm Addthis Rep. Chaka Fattah (D-PA) and Acting Secretary of Energy Daniel Poneman speak during an event on Capitol Hill featuring the directors of the five energy innovation hubs. | Energy Department video. Ben Dotson Ben Dotson Project Coordinator for Digital Reform, Office of Public Affairs What is an Energy Innovation Hub? Modeled after the strong scientific management characteristics of the Manhattan Project and AT&T Bell Laboratories, the Energy Innovation Hubs are integrated research centers that combine basic and applied research with engineering to accelerate scientific discovery that addresses critical energy issues. Yesterday, the directors of the Energy Department's Energy Innovation Hubs

145

Energy Innovation Hub Directors Visit the Hill | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Directors Visit the Hill Directors Visit the Hill Energy Innovation Hub Directors Visit the Hill April 24, 2013 - 5:39pm Addthis Rep. Chaka Fattah (D-PA) and Acting Secretary of Energy Daniel Poneman speak during an event on Capitol Hill featuring the directors of the five energy innovation hubs. | Energy Department video. Ben Dotson Ben Dotson Project Coordinator for Digital Reform, Office of Public Affairs What is an Energy Innovation Hub? Modeled after the strong scientific management characteristics of the Manhattan Project and AT&T Bell Laboratories, the Energy Innovation Hubs are integrated research centers that combine basic and applied research with engineering to accelerate scientific discovery that addresses critical energy issues. Yesterday, the directors of the Energy Department's Energy Innovation Hubs

146

Gail Harlamoff: Executive Director, Life Lab Science Program  

E-Print Network (OSTI)

started off with a past apprentice, Doron Comerchero. HeísWhat?! project director. He was an apprentice, and whilehe was an apprenticeó Rabkin: This was at CASFS. Harlamoff:

Rabkin, Sarah

2010-01-01T23:59:59.000Z

147

Project Development and Finance: Capabilities (Fact Sheet)  

SciTech Connect

Capabilities overview of NREL's Project Finance and Development Group within the Deployment and Market Transformation Directorate.

Not Available

2013-01-01T23:59:59.000Z

148

Director testifies before Senate subcommittee  

NLE Websites -- All DOE Office Websites (Extended Search)

Director testifies before Senate subcommittee Director testifies before Senate subcommittee Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues ¬Ľ submit Director testifies before Senate subcommittee Future Laboratory budgets under consideration. June 1, 2013 Director Charlie McMillan during his remarks Director Charlie McMillan during his remarks Contact Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email Lab Director Charlie McMillan and the directors of Sandia and Lawrence Livermore national laboratories recently spoke before the U.S. Senate Subcommittee on Strategic Forces, Committee on Armed Services. The purpose of the hearing was to to receive testimony on NNSA management of its national security laboratories and to review the budget request for Fiscal

149

Dr. Anthony (Tony) Peurrung Associate Laboratory Director  

E-Print Network (OSTI)

, the Intelligence Community and the National nuclear Security Administration. Dr. Peurrung has contributedDr. Anthony (Tony) Peurrung Associate Laboratory Director National Security Directorate In his current position as Associate Laboratory Director of the National Security Directorate, Dr. Tony Peurrung

150

Energy Star Building Upgrade Value Calculator | Open Energy Information  

Open Energy Info (EERE)

Energy Star Building Upgrade Value Calculator Energy Star Building Upgrade Value Calculator Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Energy Star Building Upgrade Value Calculator (for Office Properties) Agency/Company /Organization: ENERGY STAR Phase: "Evaluate Options and Determine Feasibility" is not in the list of possible values (Bring the Right People Together, Create a Vision, Determine Baseline, Evaluate Options, Develop Goals, Prepare a Plan, Get Feedback, Develop Finance and Implement Projects, Create Early Successes, Evaluate Effectiveness and Revise as Needed) for this property. User Interface: Spreadsheet Website: www.energystar.gov/index.cfm?c=comm_real_estate.building_upgrade_value The Building Upgrade Value Calculator allows practitioners to analyze the

151

DOE/EIS-0169-SA-02: Supplement Analysis for Yakima Fisheries Project --Natural Spawning Channels, Increased On-site Housing and Upgrades to the Prosser Hatchery (8/16/99)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 16, 1999 August 16, 1999 REPLY TO ATTN OF: KEWI-4 SUBJECT: Supplement Analysis for Yakima Fisheries Project, DOE/EIS-0169-SA-02 David Byrnes Project Manager - KEWN-4 Proposed Action: Yakima Fisheries Project - Natural Spawning Channels, Increased On-site Housing, and Upgrades to the Prosser Hatchery PL-6: F3204 Location: Cle Elum Supplementation and Research Facility, Cle Elum, Washington (CESRF) and Prosser Juvenile Research Facility, Prosser, Washington Proposed by: Bonneville Power Administration (BPA) and Co-Managed by the Yakama Nation (YN) and the Washington Department of Fish and Wildlife (WDFW). 1. Introduction The Bonneville Power Administration (BPA) is funding ongoing studies, research, and artificial production of several salmonid species in the Yakima and Klickitat river basins. BPA analyzed

152

Operational test report integrated system test (ventilation upgrade)  

Science Conference Proceedings (OSTI)

Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, Ay102, AZ101, AZ102.

HARTY, W.M.

1999-10-05T23:59:59.000Z

153

NERSC Director Kathy Yelick named Associate Lab Director for...  

NLE Websites -- All DOE Office Websites (Extended Search)

for Computing Sciences. Yelick has been the director of the National Energy Research Scientific Computing Center (NERSC) since 2008, a position she will continue to hold. "I am...

154

Los Alamos National Laboratory names Jeffrey Mousseau Associate Director of  

NLE Websites -- All DOE Office Websites (Extended Search)

Associate Director Of Environmental Programs Associate Director Of Environmental Programs Los Alamos National Laboratory names Jeffrey Mousseau Associate Director of Environmental Programs Mousseau currently works for the Lab's transuranic waste disposal program. September 18, 2012 Jeffrey Mousseau has been hired as the new associate director for Environmental Programs. Jeffrey Mousseau has been hired as the new associate director for Environmental Programs. Contact Communications Office (505) 667-7000 "Jeff shares my personal commitment to sustaining the current momentum of waste removal and cleanup that the Lab has steadily built over the past five years." Will Oversee Transuranic Waste Disposal and Environmental Cleanup Projects LOS ALAMOS, N.M., September 18, 2012-Los Alamos National Laboratory today

155

Mound Plant Director's Final Findings and Orders, October 4, 1995  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mound Plant Director's Final Findings and Orders, October 4, 1995 Page 1 of 16 Mound Plant Director's Final Findings and Orders, October 4, 1995 Page 1 of 16 EM Home | Regulatory Compliance | Environmental Compliance Agreements Mound Plant Director's Final Findings and Orders, October 4, 1995 BEFORE THE OHIO ENVIRONMENTAL PROTECTION AGENCY In the Matter Of: United States Department of Energy : Director's Final Mound Facility : Findings and Order P.O. Box 66 : Miamisburg, Ohio 45343-0066 : Respondent It is hereby agreed by and among the parties hereto as follows: Table of Contents I. Jurisdiction II. Parties Bound III. Definitions IV. Findings of Fact V. Orders VI. Limitations of Director's Approval VII. Notice VIII. Project Managers IX. Dispute Resolution X. Funding XI. Other Applicable Laws XII. Reservation of Rights XIII. Modification

156

Upgrading a Multifuncoid ?  

E-Print Network (OSTI)

I define the concepts of multifuncoid (and completary multifuncoid) and upgrading. Then I conjecture that upgrading of certain multifuncoids are multifuncoids (and that upgrading certain completary multifuncoids are completary multifuncoids). I have proved the conjectures for n ? 2. This short article is the first my public writing where I introduce the concept of multidimensional funcoid which I am investigating now. Refer to this Web site for the theory which I now attempt to generalize. 1

L {x Ai

2012-01-01T23:59:59.000Z

157

Light Sources Directorate Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Light Sources Directorate Light Sources Directorate Strategic Plan December 2009 Light Sources Directorate Strategic Plan December 2009 ii | Vision and Mission Light Sources Directorate Strategic Plan The VISION of the Light Sources Directorate is: to be a provider of choice for world-class photon science and facilities that deliver outstanding scientific productivity and impact, and to be recognized as a leader in developing innovative techniques and ap- plications of photon science Our MISSION is defined by the set of activities that are required to realize this vision: to advance scientific knowledge and to solve critical problems through the design, construction, operation, and use of premier photon science facilities | Table of Contents Light Sources Directorate Strategic Plan

158

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13 13 DATE: January 07, 2014 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: ACQUISITION LETTER 2014-03: ALLOWABILITY OF CONTRACTOR LITIGATION DEFENSE AND SETTLEMENT COSTS SUMMARY: The subject Acquisition Letter's purpose is to provide guidance to Contracting Officers on allowability of contractor litigation defense and settlement costs in light of Secretary of the Army v. Tecom. The guidance applies to legal costs related to allegations of discrimination where the discrimination is prohibited by the terms of the contract, such as those covered by FAR 52.222-26 (Equal Opportunity), FAR 52.222-35 (Equal Opportunity for

159

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 DATE: October 12, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Executive Order-Strengthening Protections Against Trafficking in Persons in Federal Contracts SUMMARY: On September 25, 2012, President Obama issued an Executive Order (EO) that seeks to strengthen protections against human trafficking in federal contracting. Currently, the Federal Acquisition Regulation (FAR) provisions explicitly addressing human trafficking are FAR 22.1705, and its associated contract clause, FAR 52.222-50, Combating Trafficking in Persons. The President's EO builds on these existing FAR provisions and provides further contractor and agency contract administration

160

TO: Procurement Directors FROM: Director Contracts and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 DATE: June 21, 2012 TO: Procurement Directors FROM: Director Contracts and Financial Assistance Policy Division Office of Acquisition and Project Management SUBJECT: Department of Energy (DOE) Audit Guidance for For-Profit Recipients SUMMARY: Policy Flash 2012-39 provided the final audit guidance documents for independent audit forms to use in conducting compliance audits of for-profit recipients of federal financial assistance from DOE for FY 2011 and thereafter. Attached are FAQs to answer some questions we have received about the guidance. This Flash will be available online at the following website: http://energy.gov/management/office-management/operational- management/procurement-and-acquisition/policy-flashes.

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 DATE: October 12, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Class Deviation from the Federal Acquisition Regulation (FAR) to Implement Office of Management and Budget (OMB) Policy Memorandum M-12-16, Providing Prompt Payment to Small Business Subcontractors SUMMARY: The Civilian Agency Acquisition Council (CAAC) issued Civilian Agency Acquisition Letter 2012-03 to distribute a class deviation clause agencies may use to require prime contractors to pay small business subcontractors on an accelerated timetable to the maximum extent practicable. This Policy Flash forwards the approved DOE class deviation and the Civilian Agency

162

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DATE: December 7, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Class Deviation - Extending the Biobased Product Reporting Requirement SUMMARY: The Civilian Agency Acquisition Council (CAAC) issued Civilian Agency Acquisition Letter 2013-01 to encourage agencies to extend the reporting deadline contained in paragraph (c)(2) of the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts, from October 31, 2012 to December 31, 2012. This Policy Flash forwards the approved DOE class deviation and the Civilian Agency Acquisition Letter 2013-01.

163

TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 DATE: October 31, 2013 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Affirmative procurement of biobased products under service and construction contracts (FAR clause 52.223-2) SUMMARY: The Department's Contracting Officers are reminded of the applicability of FAR clause 52.223-2 that requires contractors to submit an annual report of their biobased purchases by October 31 in the System for Award Management (SAM) located at www.sam.gov. To increase reporting compliance, please advise your contractors of this requirement. Biobased reporting is an important element in the Administration's Blueprint for the

164

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 DATE: May 2, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Updated Reporting Requirement Checklist including the Research Performance Progress Report (RPPR) SUMMARY: Policy Flash 2011-63 transmitted the previous versions of the Reporting Requirements Checklists and the Research Performance Progress Report (RPPR) which was an attachment to the checklist. This Flash transmits a combined checklist which replaces both of the previous checklists. The RPPR has also been incorporated into the checklist. Additional updates were necessary including: correcting web site addresses, removing references to subawards for audits of

165

TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

08 08 DATE: November 6, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Acquisition and Project Management SUBJECT: Major Disaster and Emergency Declarations for Specific States from Hurricane Sandy SUMMARY: The President signed Major Disaster Declarations for New Jersey (DR 4086), New York (DR-4085), Connecticut (DR-4087), and Rhode Island (DR-4089). Additionally, the President signed Emergency Declarations for New Hampshire (EM-3360), Virginia (EM-3359), West Virginia (EM-3358), Delaware (EM-3357), Rhode Island (EM-3355), Pennsylvania (EM-3356), District of Columbia (EM-3352), Massachusetts (EM-3350), and Maryland (EM-3349). For updates please go to: http://www.fema.gov/disasters.

166

TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 10 DATE: November 13, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Acquisition and Project Management SUBJECT: Hurricane Sandy Contingency Operation -- Increase in Micro-Purchase and Simplified Acquisition Thresholds for Specific States and Counties SUMMARY: The Department of Energy (DOE) Senior Procurement Executive (SPE) has increased the micro-purchase and simplified acquisition thresholds for Hurricane Sandy Contingency Operation. With reference to Policy Flash 2013-08, Major Disaster and Emergency Declarations for Specific States from Hurricane Sandy, the attachment is a copy of the SPE determination and findings to increase micro-purchase and simplified acquisition thresholds. Specifically, it increases thresholds

167

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DATE: October 12, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Extension of SBA-DOE 8(a) Partnership Agreement SUMMARY: The current Partnership Agreement between the Small Business Administration and the Department of Energy has been extended through October 31, 2012. This Flash will be available online at the following website: http://energy.gov/management/office-management/operational- management/procurement-and-acquisition/policy-flashes. Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy,

168

Principal Associate Director - Weapons Programs  

NLE Websites -- All DOE Office Websites (Extended Search)

Weapons Programs As Principal Associate Director for the Weapons Program, Knapp leads the programs to assure the safety, security, and effectiveness of the systems in the nation's...

169

TO: FROM: Procurement Directors  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2010-28 POLICY FLASH 2010-28 '/ 7- DATE: March 4,20 10 TO: FROM: Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Temporary Waiver of Mandatory Use of the Strategic Integrated Procurement Enterprise System (STRIPES) for Certain Purchase Card Transactions SUMMARY: Several issues have been identified relating to the use of STRIPES for the processing of transactions at or below the micro-purchase threshold of $3,000 using the Government-wide purchase card. These issues relate strictly to the efficient processing of such transactions and not to the ability of STRIPES to properly and accurately process these actions. Based on the above, the mandatory use of STRIPES for individual purchase card transactions

170

TO: FROM: Procurement Directors  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

b b POLICY FLASH 2010-42 . DATE: April 8,20 10 TO: FROM: Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Use of New Strategically Sourced Blanket Purchase Agreement for Domestic Delivery Services with United Parcel Service SUMMARY: The Department of Energy (DOE) is participating as an authorized user of the second generation General Services Administration (GSA) Blanket Purchase Agreement (BPA) GS-33F-BQV08 for Express and Ground Domestic Delivery Services (DDS2) in the continental United States, Alaska, Hawaii, and Puerto Rico. DDS2 is a full service Federal Strategic Sourcing Initiative (FSSI) solution providing agencies with a range of delivery options as well as

171

Viewgraph from the Director  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 Viewgraph from the Director Art Rosenfeld standing in front of a black board. Few benefits are provided by electric power plants, coal mines, oil pipelines, and other energy supply systems aside from the energy they produce. Technologies to improve energy end-use efficiency, however, offer numerous non-energy benefits. One class of such benefits accrues at the national level-improved competitiveness, energy security, net job creation, environmental protection-while another relates to consumer decision-making. From a consumer perspective, it is often the non-energy benefits that motivate (or can be used to promote) decisions to adopt energy-efficient technologies. A striking example is the rapid penetration of microwave ovens into the housing stock. While energy savings from microwave ovens can

172

W. E. Mott, Director,  

Office of Legacy Management (LM)

Department of Energy Department of Energy F&k i?z;;Operations dak Ridge, Tennessee 37830 W. E. Mott, Director, It is concluded that the potential for uranium contamination, even during the contract period, was small and that subsequent disposition of laboratory, furnishings and equipment further reduced that potential to the point where, it is felt, the need for further onsite investigation is not indicated. Hence, it is recommended that the reassessment of the site at 818 Perry Street, Richmond, Virginia, be terminated with this report. ti?LbL~ W. T. Thornton Environmental Protection Branch 0SE:WTT Safety & Environmental Control Division c d v76-2 Bo 7W -rwG 1 - ---_ -- -- Er-fl ,T - .,- L 4-------c 1 / 7, pi ' I ./7 * ---:;N-... __ P 2 (' - , . . dq/ ' j'

173

Procurement Directors DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18 18 1 POLICY FLASH 2008-1 8 January 29,2008 Procurement Directors DATE: TO: FROM: Office of Procurement and Assistance Policy, MA-6 1 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2008-18 SUMMARY: The General Services Administration has issued Federal Acquisition Circular 2005-23. This Circular can be found at page 732 14 of the December 26,2007 Federal Register. The Circular covers three subjects for which interim or final rules have been issued amending the Federal Acquisition Regulation. A description of each revision is contained in the attachment. None of these necessitates a revision of the DEAR. One of the revisions dealing with the Electronic Product Environmental Assessment Tool (EPEAT) replaces

174

Fernald Environmental Management Project Director's Final Findings...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RCRACERCLA Scope Summary Integrate the Ohio EPA RCRA hazardous waste closure requirements into the remediation requirements of CERCLA Parties DOE; Fernald Environmental...

175

Paul Glowaski: Garden Director, Homeless Garden Project  

E-Print Network (OSTI)

to find work. They moved to Detroit fromóthey were livinggot married, they moved, like I said, to Detroit. Mybecame a bus driver in Detroit in the fifties, I guess. He

Reti, Irene H.

2010-01-01T23:59:59.000Z

176

Paul Glowaski: Garden Director, Homeless Garden Project  

E-Print Network (OSTI)

the lake effect from Lake Michigan, and it can be kind ofhad moved from Canada to Michigan right after World War II.and they moved to rural Michigan, southern Michigan, and

Reti, Irene H.

2010-01-01T23:59:59.000Z

177

Fernald Environmental Management Project Director's Final Findings...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CERCLA Scope Summary Establish guidelines and deadlines for neutralizationremoval of the hazardous waste in the uranyl nitrate hexahydrate (UNH) System Parties DOE; Fernald...

178

Paul Glowaski: Garden Director, Homeless Garden Project  

E-Print Network (OSTI)

by the time the training program started at the beginning ofre in charge of the training program. The classes can rangea whole range. Our training program is a little more broad

Reti, Irene H.

2010-01-01T23:59:59.000Z

179

Paul Glowaski: Garden Director, Homeless Garden Project  

E-Print Network (OSTI)

So you were one intern-apprentice, and there were 300 acres?of perspective. While I was an apprentice, of course Iím inearlier. While I was an apprentice, I went and I taught a

Reti, Irene H.

2010-01-01T23:59:59.000Z

180

Paul Glowaski: Garden Director, Homeless Garden Project  

E-Print Network (OSTI)

was this kid moving from Vermont. Iím sure I was coming fromGlowaski: Literally, and Iím no better off. I loved Vermont.Vermont is amazing. Itís just so nice, and everybody is

Reti, Irene H.

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Fernald Environmental Management Project Director's Findings...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

* Deadlines for activities required of DOE and Westinghouse are outlined in these Orders. * DOE and Westinghouse shall submit results of a study to determine the solids...

182

EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Idaho National Engineering Laboratory Sewer System Upgrade 7: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho SUMMARY This EA evaluates the environmental impacts of a proposal to upgrade the Sewer System at the U.S. Department of Energy's Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho. The proposed action would include activities conducted at the Central Facilities Area, Test Reactor Area, and the Containment Test Facility at the Test Area North at INEL. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 1, 1994 EA-0907: Finding of No Significant Impact Idaho National Engineering Laboratory Sewer System Upgrade Project

183

Chief Executive Officer Message 2 Scientific Director Message 4  

E-Print Network (OSTI)

: Biomedical and Life Sciences Intelligent Transport Systems Safety and Security Environmental Management#12;#12; Chief Executive Officer Message 2 Scientific Director Message 4 About NICTA 7 Success Stories 8 Strategic Focus Projects 16 Research Programs 20 Research Projects 36 Our Researchers 60 Young

Heiser, Gernot

184

BNL Environmental Management Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

Surface Projects Brookhaven Graphite Research Reactor High Flux Beam Reactor Waste Management Division OU IV Five-Year Review The five-year review of the Operable Unit IV...

185

Nuclear & Particle Physics Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

RHIC Planning Group Documents RHIC Mid-Term Plan (21406) Tom Kirk's Initiating Memo, 8102003 pdf) RHIC Collider Projections (2004-2008) (pdf) Slides for 82003 Meeting (v3)...

186

Nuclear & Particle Physics Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE RHIC Facility Operations Review, 28-30 June 2010. Annual DOE Review of High Energy Physics Science & Technology, 19-21 May 2010 Report of 2010 ATLAS Project Manager's Review,...

187

Fermilab | Directorate | Program Planning Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Planning Office Program Planning Office Steve Geer, Head The Program Planning Office within the Fermilab Directorate coordinates the experimental physics program carried out at the Laboratory. The office provides a link between ongoing and planned experiments and the Directorate, by: Acting as liaison between experimenters and laboratory staff regarding beam conditions during accelerator operation. Establishing priorities between accelerator studies and experiments and among experiments, in consultation with the Director, and resolving conflicting requests from experiments. Coordinating Division and Section reviews of draft Memoranda of Understanding for approved experiments. Coordinating updates to the "Procedures for Researchers" which provides a guide for researchers using Fermilab facilities.

188

ESH&Q Directorate Home Page  

NLE Websites -- All DOE Office Websites (Extended Search)

Training & Qualifications Other BNL Site Index Can't View PDFs? Environment, Safety and Health Directorate George A. Goode Assistant Laboratory Director ES&H Organizational Chart...

189

Director's colloquium March 18 large hadron collider  

NLE Websites -- All DOE Office Websites (Extended Search)

Director's colloquium large hadron collider Director's colloquium March 18 large hadron collider Lyndon Evans of CERN will talk about the most complex scientific instrument ever...

190

TMS Board of Directors: James W. Sears  

Science Conference Proceedings (OSTI)

TMS Director/Chair, Materials Processing & Manufacturing Division. James W. Sears is director of Additive Manufacturing at the South Dakota School of Mines†...

191

Organization: Principal Associate Directorate for Global Security...  

NLE Websites -- All DOE Office Websites (Extended Search)

Principal Associate Director Terry Wallace Associate Director Threat Identification and Response Scott Gibbs Phone: 1-505-667-1663 Fax: 1-505-665-8974 Organization PADGS...

192

Fermilab | Fermilab Director Search | Process and Charge  

NLE Websites -- All DOE Office Websites (Extended Search)

Process and Charge Charge to the Director Search Committee Fermi National Accelerator Laboratory The Fermi Research Alliance, LLC Board of Directors charges the Committee to engage...

193

TMS Board of Directors: James W. Sears  

Science Conference Proceedings (OSTI)

James W. Sears is director of Additive Manufacturing at the South Dakota School of Mines & Technology and executive director of the Quad Cities Manufacturing†...

194

T10 SND UPGRADE  

E-Print Network (OSTI)

The program of upgrade of the Spherical Neutral Detector for future experiments at a new VEPP-2000 e + e ? collider is presented. Modernization includes upgrades of electromagnetic calorimeter, tracking system, detector electronics, data acquisition system, and offline software. It is also planned to equip the detector with two new subsystems: particle identification system based on aerogel ?erenkov counters and external electron tagging system for ?? physics. 1

unknown authors

2001-01-01T23:59:59.000Z

195

Optics upgrade for switchyard  

SciTech Connect

An upgrade of the Switchyard optics is proposed. This upgrade extends the P3 (old Main Ring) lattice through enclosure C. The septa for the 3-way Meson Area split is moved from enclosure F1 to enclosure M01. The functionality of the Meson Target Train is preserved. Finally, for the purpose of demonstrating that the resulting split can be transported, a straw-man lattice is proposed for enclosure M02 and beyond.

Kobilarcik, Thomas R.; /Fermilab

2005-08-01T23:59:59.000Z

196

Innovative Technology Improves Upgrading Process for Unconventional Oil  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Improves Upgrading Process for Unconventional Technology Improves Upgrading Process for Unconventional Oil Resources Innovative Technology Improves Upgrading Process for Unconventional Oil Resources April 9, 2013 - 1:57pm Addthis Washington, DC - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology. Heavy oil is crude oil that is viscous and requires thermally enhanced oil

197

Innovative Technology Improves Upgrading Process for Unconventional Oil  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Innovative Technology Improves Upgrading Process for Unconventional Innovative Technology Improves Upgrading Process for Unconventional Oil Resources Innovative Technology Improves Upgrading Process for Unconventional Oil Resources April 9, 2013 - 1:57pm Addthis Washington, DC - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology.

198

Director's commitment to diversity recognized  

NLE Websites -- All DOE Office Websites (Extended Search)

Director's commitment to diversity recognized Director's commitment to diversity recognized Director's commitment to diversity recognized Profiles in Diversity Journal is recognizing Director Michael Anastasio for his commitment to workplace diversity. March 11, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Contact Communications Office

199

Directorate Contacts | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Contacts Directorate E-mail Phone Fax Business Services branhams@ornl.gov 865.241.7614 865.241.7595 Communications keimdm@ornl.gov 865.576.9122 865.574.0595 Computing...

200

Preparation for upgrading western subbituminous coal  

SciTech Connect

The objective of this project was to establish the physical and chemical characteristics of western coal and determine the best preparation technologies for upgrading this resource. Western coal was characterized as an abundant, easily mineable, clean, low-sulfur coal with low heating value, high moisture, susceptibility to spontaneous ignition, and considerable transit distances from major markets. Project support was provided by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The research was conducted by the Western Research Institute, (WRI) in Laramie, Wyoming. The project scope of work required the completion of four tasks: (1) project planning, (2) literature searches and verbal contacts with consumers and producers of western coal, (3) selection of the best technologies to upgrade western coal, and (4) identification of research needed to develop the best technologies for upgrading western coals. The results of this research suggest that thermal drying is the best technology for upgrading western coals. There is a significant need for further research in areas involving physical and chemical stabilization of the dried coal product. Excessive particle-size degradation and resulting dustiness, moisture reabsorption, and high susceptibility to spontaneous combustion are key areas requiring further research. Improved testing methods for the determination of equilibrium moisture and susceptibility to spontaneous ignition under various ambient conditions are recommended.

Grimes, R.W.; Cha, C.Y.; Sheesley, D.C.

1990-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Computation Directorate 2007 Annual Report  

SciTech Connect

If there is a single word that both characterized 2007 and dominated the thoughts and actions of many Laboratory employees throughout the year, it is transition. Transition refers to the major shift that took place on October 1, when the University of California relinquished management responsibility for Lawrence Livermore National Laboratory (LLNL), and Lawrence Livermore National Security, LLC (LLNS), became the new Laboratory management contractor for the Department of Energy's (DOE's) National Nuclear Security Administration (NNSA). In the 55 years under the University of California, LLNL amassed an extraordinary record of significant accomplishments, clever inventions, and momentous contributions in the service of protecting the nation. This legacy provides the new organization with a built-in history, a tradition of excellence, and a solid set of core competencies from which to build the future. I am proud to note that in the nearly seven years I have had the privilege of leading the Computation Directorate, our talented and dedicated staff has made far-reaching contributions to the legacy and tradition we passed on to LLNS. Our place among the world's leaders in high-performance computing, algorithmic research and development, applications, and information technology (IT) services and support is solid. I am especially gratified to report that through all the transition turmoil, and it has been considerable, the Computation Directorate continues to produce remarkable achievements. Our most important asset--the talented, skilled, and creative people who work in Computation--has continued a long-standing Laboratory tradition of delivering cutting-edge science even in the face of adversity. The scope of those achievements is breathtaking, and in 2007, our accomplishments span an amazing range of topics. From making an important contribution to a Nobel Prize-winning effort to creating tools that can detect malicious codes embedded in commercial software; from expanding BlueGene/L, the world's most powerful computer, by 60% and using it to capture the most prestigious prize in the field of computing, to helping create an automated control system for the National Ignition Facility (NIF) that monitors and adjusts more than 60,000 control and diagnostic points; from creating a microarray probe that rapidly detects virulent high-threat organisms, natural or bioterrorist in origin, to replacing large numbers of physical computer servers with small numbers of virtual servers, reducing operating expense by 60%, the people in Computation have been at the center of weighty projects whose impacts are felt across the Laboratory and the DOE community. The accomplishments I just mentioned, and another two dozen or so, make up the stories contained in this report. While they form an exceptionally diverse set of projects and topics, it is what they have in common that excites me. They share the characteristic of being central, often crucial, to the mission-driven business of the Laboratory. Computational science has become fundamental to nearly every aspect of the Laboratory's approach to science and even to the conduct of administration. It is difficult to consider how we would proceed without computing, which occurs at all scales, from handheld and desktop computing to the systems controlling the instruments and mechanisms in the laboratories to the massively parallel supercomputers. The reasons for the dramatic increase in the importance of computing are manifest. Practical, fiscal, or political realities make the traditional approach to science, the cycle of theoretical analysis leading to experimental testing, leading to adjustment of theory, and so on, impossible, impractical, or forbidden. How, for example, can we understand the intricate relationship between human activity and weather and climate? We cannot test our hypotheses by experiment, which would require controlled use of the entire earth over centuries. It is only through extremely intricate, detailed computational simulation that we can test our theories, and simulati

Henson, V E; Guse, J A

2008-03-06T23:59:59.000Z

202

Retrofit Upgrade of Center Break Cell Technology to Point Feeding ...  

Science Conference Proceedings (OSTI)

... been a few attempts worldwide to upgrade these cells so as to implement the newer ... The results show that this project has decreased the energy consumption and ... Production Application Study on Magneto-Hydro-Dynamic Stability of a†...

203

Office of Science Approves Critical Decision 1 for APS Upgrade...  

NLE Websites -- All DOE Office Websites (Extended Search)

2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed Office of Science Approves Critical Decision 1 for APS Upgrade Project SEPTEMBER 15, 2011...

204

Weights and Measures State Directors AC  

Science Conference Proceedings (OSTI)

State Directors AC. Alaska. Mailing Address, Contact Information. Alaska Division of Measurement Standards/CVE 11900 ...

2013-05-03T23:59:59.000Z

205

Instrumentation upgrades for the Macromolecular Crystallography beamlines  

NLE Websites -- All DOE Office Websites (Extended Search)

Instrumentation upgrades for the Macromolecular Crystallography beamlines Instrumentation upgrades for the Macromolecular Crystallography beamlines of the Swiss Light Source Monday, October 29, 2012 - 2:00am SSRL, Bldg. 137, Rm. 322 Martin Fuchs, MX Group, Swiss Light Source; Paul Scherrer Institute (Villigen, Switzerland) A new unified diffractometer - the D3 - has been developed for the three MX beamlines. The first of the instruments is in general user operation at beamline X10SA since April 2012. The varied demands from both challenging academic research projects as well as high throughput industrial applications on today's macromolecular crystallography beamlines drive developments to both endstations and beamline optics. Recent instrumentation upgrades to the macromolecular crystallography (MX) beamlines of the Swiss Light Source therefore aimed to

206

The Jefferson Lab 12 GeV Upgrade  

Science Conference Proceedings (OSTI)

A major upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Facility is in progress. Construction began in 2008 and the project should be completed in 2015. The upgrade includes doubling the energy of the electron beam to 12 GeV, the addition of a new fourth experimental hall, and new experimental equipment in three of the experimental halls. A brief overview of this upgrade project is presented along with some highlights of the anticipated experimental program.

R.D. McKeown

2011-10-01T23:59:59.000Z

207

Upgrade Your Refinery for Energy Conservation  

E-Print Network (OSTI)

Upgrading existing refineries for efficient energy utilization imposes strict restraints upon design engineers. Present and future production requirements must be defined. Reliable operating data must be obtained from historical records and test runs to accurately define actual performance of each piece of equipment. A complete simulation model of the facility is developed and tested. Future operations are evaluated using the model to define heat and material balance requirements for all projected operations. Energy conservation projects are evaluated with the model to define energy savings over the life of each project. A discounted cash flow analysis is formulated and an optimum set of projects yielding maximum rates of return are selected for implementation.

Johnnie, D. H., Jr.; Klooster, H. J.

1983-01-01T23:59:59.000Z

208

Los Alamos National Laboratory names Jeffrey Mousseau Associate Director of  

NLE Websites -- All DOE Office Websites (Extended Search)

names names Jeffrey Mousseau Associate Director of Environmental Programs September 18, 2012 Will Oversee Transuranic Waste Disposal and Environmental Cleanup Projects LOS ALAMOS, N.M., September 18, 2012-Los Alamos National Laboratory today announced that Jeffrey Mousseau has been hired as the new associate director for Environmental Programs. Mousseau currently works as a senior project manager for the Laboratory's transuranic waste disposal program. In his new position, he will oversee this program as well as other key environmental cleanup and monitoring activities. - 2 - "Jeff shares my personal commitment to sustaining the current momentum of waste removal and cleanup that the Lab has steadily built over the past five years," said Laboratory Director Charlie McMillan. "His expertise in this area is outstanding, and will

209

Mr. Walter Huber, Director Capital Improvements Division National Capital Region  

Office of Legacy Management (LM)

Walter Huber, Director Walter Huber, Director Capital Improvements Division National Capital Region 7th & D Streets, N.W. Washington, D.C. 20407 Dear Mr. Huber: As you may know, the Department of Energy (DOE) is evaluating the radiological condition of sites that were utilized under the Manhattan Engineer District (MED) and the Atomic Energy Commission (AEC) during the early years of nuclear development to determine whether they need remedial action and whether the Department has authority to perform such action. General Services Administration (GSA) was contacted through correspondence with Mr. John P. Allen, Project Director, Special Projects Division of GSA, that the former National Bureau of Standards (NBS) building on Van Ness Street was identified as one such site. This building was used by NBS

210

Upgrading Below Grade Spaces  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Patrick H. Huelman, Sam Breidenbach, Steve Schirber Patrick H. Huelman, Sam Breidenbach, Steve Schirber NorthernSTAR Building America Partnership Upgrading Below Grade Spaces Residential Energy Efficiency Stakeholder March 1, 2012 Austin, TX * Act 1: Technical Challenges & Opportunities - Pat Huelman, University of Minnesota * Act 2: Assessing Homeowner Priorities & Risks - Sam Breidenbach, TDS Custom Construction * Act 3: An Industry Perspective - Steve Schirber, Cocoon Act 1. Upgrade Below Grade * Basement Remodeling: It Doesn't Get Any Riskier! - Combustion safety - Foundation moisture - Radon (& other soil gases) - Biologicals (mold, dust mites, etc.) - Garage gases (if attached) * And front and center are uncontrolled... - negative pressures in basements (beyond stack)

211

AGS intensity upgrades  

SciTech Connect

After the successful completion of the AGS Booster and several upgrades of the AGS, a new intensity record of 6.3 x 10{sup 13} protons per pulse accelerated to 24 GeV was achieved. The high intensity slow-extracted beam program at the AGS typically serves about five production targets and about eight experiments including three rare Kaon decay experiments. Further intensity upgrades are being discussed that could increase the average delivered beam intensity by up to a factor of four.

Roser, T.

1995-12-01T23:59:59.000Z

212

Tom Rogers Director, Industrial Partnerships  

NLE Websites -- All DOE Office Websites (Extended Search)

Tom Rogers, rogerstc@ornl.gov 865-241-2149 Tom Rogers, rogerstc@ornl.gov 865-241-2149 Tom Rogers Director, Industrial Partnerships and Economic Development Tom Rogers was named Director of Industrial Partnerships and Economic Development at the Oak Ridge National Laboratory in June, 2008. His responsibilities include directing engagements with industrial partners, forging new ORNL entrepreneurial support efforts, and leading a number of strategic initiatives such as the Carbon Fiber Composites Cluster and development of the Oak Ridge Science and Technology Park. Prior to joining ORNL, Tom was the founding President and CEO of Technology 2020, a national award-winning public-private partnership focused on a building a robust regional entrepreneurial support system. Tom has also served as the Executive Director of the Tennessee Technology

213

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

36 36 DATE: March 7 , 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Update to Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 SUMMARY: Since we previously notified you in Policy Flash 2012-44 for Congressional notifications, there are changes to the process. On March 15, 2013, the automated system will be implemented via a phased approach. As your office transitions to the automated system, reporting for awards and modifications shall be through the automated system. For offices which will not begin using the automated system until later, these offices shall continue to do manual reporting

214

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2013-46 POLICY FLASH 2013-46 DATE: April 18, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Awardee Share in STRIPES SUMMARY: A problem has been identified with completing the awardee share fields on the FAADS/FAADS Plus reporting screen in STRIPES. Data quality is an area of major focus especially for the data being sent to USASpending.gov as required by the Federal Funding and Transparency Act. The attached Awardee Share Procedures detail the procedures for correctly reporting the awardee share (also known as the cost share, recipient share, and non-federal share) on the FAADS/FAADS Plus screen in STRIPES.

215

TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2013-58 POLICY FLASH 2013-58 DATE: June 5, 2013 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Revised Guide for Financial Assistance SUMMARY: Attached is a revised Guide for Financial Assistance. The Guide has been updated to reflect changes to web sites, organization names, systems, and DOE policies and practices since the guide was last issued. The revision date has been inserted in the section heading for all sections that had substantive changes (not just web site or organization name changes). This flash and its attachments may be viewed at http://management.energy.gov/policy_guidance/policy_flashes.htm.

216

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-10 4-10 DATE: November 26 , 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Update to Congressional Notifications - Full Implementation of Advanced Notification of Awards (ANA) System SUMMARY: Policy Flash 2013-36 transmitted Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6 describing the revised ANA process. There are no changes to these two chapters. As described in the earlier Policy Flash, the system was being implemented in a Phased approach. On October 25, 2013, the second and final phase of the ANA system was implemented. The system is now mandatory for all DOE organizations as

217

Environmental Assessment and Finding of No Significant Impact: Wastewater Treatment Capability Upgrade, Project NO. 96-D-122 Pantex Plant Amarillo, Texas  

Science Conference Proceedings (OSTI)

This Environmental Assessment (EA) addresses the U.S. Department of Energy (DOE) proposed action regarding an upgrade of the Pantex Plant Wastewater Treatment Facility (WWTF). Potential environmental consequences associated with the proposed action and alternative actions are provided. DOE proposes to design, build, and operate a new WWTF, consistent with the requirements of Title 30 of the Texas Administrative Code (TAC), Chapter 317, ''Design Criteria for Sewage Systems,'' capable of supporting current and future wastewater treatment requirements of the Plant. Wastewater treatment at Pantex must provide sufficient operational flexibility to meet Pantex Plant's anticipated future needs, including potential Plant mission changes, alternative effluent uses, and wastewater discharge permit requirements. Treated wastewater effluent and non-regulated water maybe used for irrigation on DOE-owned agricultural land. Five factors support the need for DOE action: (1) The current WWTF operation has the potential for inconsistent permit compliance. (2) The existing WWTF lies completely within the 100-year floodplain. (3) The Pantex Plant mission has the potential to change, requiring infrastructure changes to the facility. (4) The life expectancy of the existing facility would be nearing its end by the time a new facility is constructed. (5) The treated wastewater effluent and non-regulated water would have a beneficial agricultural use through irrigation. Evaluation during the internal scoping led to the conclusion that the following factors are present and of concern at the proposed action site on Pantex Plant: (1) Periodic wastewater effluent permit exceedances; (2) Wetlands protection and floodplain management; (3) Capability of the existing facility to meet anticipated future needs of Pantex (4) Existing facility design life; and (5) Use of treated wastewater effluent and non-regulated water for irrigation. Evaluation during the internal scoping led to the conclusion that the following conditions are not present, nor of concern at the proposed site on Pantex Plant, and no further analysis was conducted: (1) State or national parks, forests, or other conservation areas; (2) Wild and scenic rivers; (3) Natural resources, such as timber, range, soils, minerals; (4) Properties of historic, archeological, or architectural significance; (5) Native American concerns; (6) Minority and low-income populations; and (7) Prime or unique farmland. In this document, DOE describes the proposed action and a reasonable range of alternatives to the proposed action, including the ''No-Action'' alternative. The proposed action cited in the ''U.S. Department of Energy Application for a Texas Pollutant Discharge Elimination System Permit Modifying Permit to Dispose of Waste, No. 02296,'' December 1998, included the construction of a new wastewater treatment facility, a new irrigation storage pond, and the conversion of the current wastewater treatment facility into an irrigation storage pond. Although a permit modification application has been filed, if a decision on this EA necessitates it, an amendment to the permit application would be made. The permit application would be required for any of the alternatives and the filing does not preclude or predetermine selection of an alternative considered by this EA. This permit change would allow Pantex to land-dispose treated wastewater by irrigating agricultural land. This construction for the proposed action would include designing two new lagoons for wastewater treatment. One of the lagoons could function as a facultative lagoon for treatment of wastewater. The second lagoon would serve as an irrigation storage impoundment (storage pond), with the alternative use as a facultative lagoon if the first lagoon is out of service for any reason. The new facultative lagoon and irrigation water storage pond would be sited outside of the 100-year flood plain. The existing WWTF lagoon would be used as a storage pond for treated wastewater effluent for irrigation water, as needed. The two new lagoons would be li

N /A

1999-05-27T23:59:59.000Z

218

Biochemical upgrading of oils  

DOE Patents (OSTI)

A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing in organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed.

Premuzic, Eugene T. (East Moriches, NY); Lin, Mow S. (Rocky Point, NY)

1999-01-12T23:59:59.000Z

219

Biochemical upgrading of oils  

DOE Patents (OSTI)

A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed. 121 figs.

Premuzic, E.T.; Lin, M.S.

1999-01-12T23:59:59.000Z

220

The upgrade of GEO600  

E-Print Network (OSTI)

The German / British gravitational wave detector GEO 600 is in the process of being upgraded. The upgrading process of GEO 600, called GEO-HF, will concentrate on the improvement of the sensitivity for high frequency signals and the demonstration of advanced technologies. In the years 2009 to 2011 the detector will undergo a series of upgrade steps, which are described in this paper.

Harald LŁck; Christopf Affeldt; Jerome Degallaix; Andreas Freise; Hartmut Grote; Martin Hewitson; Stefan Hild; Jonathan Leong; Mirko Prijatelj; Kenneth A. Strain; Benno Willke; Holger Wittel; Karsten Danzmann

2010-04-02T23:59:59.000Z

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

APS Upgrade | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

APS APS View Larger The brightness and energy of x-ray beams are critical properties for research. Higher brightness means more x-rays can be focused onto a smaller, laser-like spot, allowing researchers to gather more data in greater detail in less time. Higher energies allow x-rays to penetrate deeper inside materials to reveal crucial information about a material's structure and function. The combination of high brightness and high energy allows the observation and imaging - in real time - of fast and ultrafast technologically important processes, including fuel sprays, magnetic switching, and biological processes in living organisms. The APS Upgrade project will increase the brightness of the APS high-energy (hard) x-ray beams. This will equip researchers for the groundbreaking

222

Project Development and Finance: Capabilities (Fact Sheet)  

SciTech Connect

Capabilities overview of NREL's Project Finance and Development Group within the Deployment and Market Transformation Directorate.

2013-01-01T23:59:59.000Z

223

Energy Efficiency Through Lighting Upgrades  

Science Conference Proceedings (OSTI)

Lighting upgrades including neon to LED, incandescent to CFL's and T-12 to T-8 and T-5's were completed through this grant. A total of 16 Chickasaw nation facilities decreased their carbon footprint because of these grant funds. Calculations used were based on comparing the energy usage from the previous year√?¬Ę√?¬?√?¬?s average and the current energy usage. For facilities without a full year's set of energy bills, the month after installation was compared to the same month from the previous year. Overall, the effect the lighting change-outs had for the gaming centers and casinos far exceeded expectations. For the Madill Gaming Center; both an interior and exterior upgrade was performed which resulted in a 31% decrease in energy consumption. This same reduction was seen in every facility that participated in the grant. Just by simply changing out light bulbs to newer energy efficient equivalents, a decrease in energy usage can be achieved and this was validated by the return on investment seen at Chickasaw Nation facilities. Along with the technical project tasks were awareness sessions presented at Chickasaw Head Starts. The positive message of environmental stewardship was passed down to head start students and passed along to Chickasaw employees. Excitement was created in those that learned what they could do to help reduce their energy bills and many followed through and took the idea home. For a fairy low cost, the general public can also use this technique to lower their energy consumption both at home and at work. Although the idea behind the project was somewhat simple, true benefits have been gained through environmental awareness and reductions of energy costs.

Kara Berst; Maria Howeth

2010-06-01T23:59:59.000Z

224

ARPA-E Director Arun Majumdar to Host Conference Call to Announce New  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Director Arun Majumdar to Host Conference Call to Announce Director Arun Majumdar to Host Conference Call to Announce New ARPA-E Projects ARPA-E Director Arun Majumdar to Host Conference Call to Announce New ARPA-E Projects September 28, 2011 - 3:28pm Addthis Washington, D.C. - Tomorrow, Thursday, September 29, Arun Majumdar, Director of the Advanced Research Projects Agency - Energy (ARPA-E) at the Department of Energy, will host a conference call to announce newly selected cutting-edge research projects aimed at dramatically improving how the U.S. uses and produces energy. This fourth round of ARPA-E project selections focuses on transformational, breakthrough technologies in rare earth alternatives, biofuels, thermal storage, electronic grid controls, and solar power electronics. Demonstrating the success ARPA-E has already

225

JEFFERSON LAB 12 GEV CEBAF UPGRADE  

Science Conference Proceedings (OSTI)

The existing continuous electron beam accelerator facility (CEBAF) at Thomas Jefferson National Accelerator Facility (TJNAF) is a 5-pass, recirculating cw electron Linac operating at approx6 GeV and is devoted to basic research in nuclear physics. The 12 GeV CEBAF Upgrade is a $310 M project, sponsored by the Department of Energy (DOE) Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. The project received construction approval in September 2008 and has started the major procurement process. The cryogenic aspects of the 12 GeV CEBAF Upgrade includes: doubling the accelerating voltages of the Linacs by adding ten new high-performance, superconducting radiofrequency (SRF) cryomodules (CMs) to the existing 42 1/4 cryomodules; doubling of the 2 K cryogenics plant; and the addition of eight superconducting magnets.

Rode, C. H. [Thomas Jefferson National Accelerator Facility, Newport News, Virginia, 23606 (United States)

2010-04-09T23:59:59.000Z

226

CRYOGENICS IN BEPCII UPGRADE.  

SciTech Connect

THIS PAPER PRESENTS A CRYOGENIC DESIGN FOR UPGRADING THE BEIJING ELECTRON POSITRON COLLIDER AT THE INSTITUTE OF HIGH ENERGY PHYSICS IN BEIJING. THE UPGRADE INVOLVES 3 NEW SUPERCONDUCTING FACILITIES, THE INTERACTION REGION QUADRUPOLE MAGNETS, THE DETECTOR SOLENOID MAGNETS AND THE SRF CAVITIES. FOR COOLING OF THESE DEVICES, A NEW CRYPLANT WITH A TOTAL CAPACITY OF 1.0KW AT 4.5K IS TO BE BUILT AT IHEP. AN INTEGRATED CRYOGENIC DESIGN TO FIT THE BEPCII CRYOGENIC LOADS WITH HIGH EFFICIENCY IS CARRIEDOUT USING COMPUTATIONAL PROCESS ANALYSIS SOFTWARE WITH THE EMPHASES ON ECONOMICS AND SAFETY IN BOTH CONSTRUCTION AND OPERATION OF THE PLANT. THIS PAPER DESCRIBES THE CRYOGENIC CHARACTERISTICS OF EACH SUPERCONDUCTING DEVICE, THEIR COOLING SCHEMES AND THE OVERALL CRYOPLANT.

JIA,L.; WANG,L.; LI,S.

2002-07-22T23:59:59.000Z

227

Energy Department's Data Director Named Presidential Innovation Fellow |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department's Data Director Named Presidential Innovation Department's Data Director Named Presidential Innovation Fellow Energy Department's Data Director Named Presidential Innovation Fellow August 23, 2012 - 5:14pm Addthis The Presidential Innovation Fellows being sworn in today. | Photo courtesy of the Office of Science and Technology Policy. The Presidential Innovation Fellows being sworn in today. | Photo courtesy of the Office of Science and Technology Policy. John Chu John Chu Communications Specialist with the Office of Energy Efficiency and Renewable Energy What does this project do? The Presidential Innovation Fellows program pairs top innovators from the private sector, non-profits, and academia with top innovators in government to collaborate on solutions that aim to deliver significant results in six months.

228

The LHCb VELO Upgrade  

E-Print Network (OSTI)

LHCb is a forward spectrometer experiment dedicated to the study of new physics in the decays of beauty and charm hadrons produced in proton collisions at the Large Hadron Collider (LHC) at CERN. The VErtex LOcator (VELO) is the microstrip silicon detector surrounding the interaction point, providing tracking and vertexing measurements. The upgrade of the LHCb experiment, planned for 2018, will increase the luminosity up to $\\rm 2\\times10^{33}\\ cm^{-2}s^{-1}$ and will perform the readout as a trigger-less system with an event rate of 40 MHz. Extremely non-uniform radiation doses will reach up to $\\rm 5 \\times 10^{15}$ 1 MeV$\\rm n_{eq}/cm^2$ in the innermost regions of the VELO sensors, and the output data bandwidth will be increased by a factor of 40. An upgraded detector is under development based in a pixel sensor of the Timepix/Medipix family, with 55 x 55 $\\rm \\mu m^2$ pixels. In addition a microstrip solution with finer pitch, higher granularity and thinner than the current detector is being developed in parallel. The current status of the VELO upgrade program will be described together with recent testbeam results.

Rodriguez Perez P.; LHCb VELO Group

2013-02-25T23:59:59.000Z

229

Weights and Measures State Directors M  

Science Conference Proceedings (OSTI)

State Directors M. Maine. Mailing Address, Contact Information. Maine Quality Assurance & Regulations 28 State House Station Augusta, ME 04333. ...

2013-08-26T23:59:59.000Z

230

Weights and Measures State Directors IL  

Science Conference Proceedings (OSTI)

State Directors IL. Idaho. Mailing Address, Contact Information. ISDA Bureau of Weights & Measures PO Box 790 Boise, ID 83701. ...

2013-05-07T23:59:59.000Z

231

Naval Nuclear Propulsion Program Directorate, Washington ...  

Science Conference Proceedings (OSTI)

Naval Nuclear Propulsion Program Directorate, Washington, DC. NVLAP Lab Code: 100565-10. Address and Contact Information: Naval Reactors ...

2013-07-26T23:59:59.000Z

232

Office of the Director -- Chief of Staff  

Science Conference Proceedings (OSTI)

... Director in administering the policies, programs, and ... and ramifications of policy and program ... INTERNATIONAL AND ACADEMIC AFFAIRS OFFICE ...

2012-02-08T23:59:59.000Z

233

Lab Director's Diversity & Inclusion Message | Argonne National...  

NLE Websites -- All DOE Office Websites (Extended Search)

Diversity Message from the Lab Director Diversity & Inclusion Advisory Council Workforce Pipeline Mentoring Leadership Development Policies & Practices Business Diversity Outreach...

234

Naval Nuclear Propulsion Program Directorate, Washington ...  

Science Conference Proceedings (OSTI)

Naval Nuclear Propulsion Program Directorate, Washington, DC. NVLAP Lab Code: 100565-0. Address and Contact Information: ...

2013-08-23T23:59:59.000Z

235

Naval Nuclear Propulsion Program Directorate, Washington ...  

Science Conference Proceedings (OSTI)

Naval Nuclear Propulsion Program Directorate, Washington, DC. NVLAP Lab Code: 100565-2. Address and Contact Information: Point Loma, Bldg. ...

2013-08-23T23:59:59.000Z

236

Weights and Measures State Directors W - Z  

Science Conference Proceedings (OSTI)

State Directors W - Z. Washington. Mailing Address, Contact Information. WA Department of Agriculture PO Box 42560 Olympia, WA 98504. ...

2012-11-29T23:59:59.000Z

237

Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Case Study - Energy Efficiency Upgrades for Fermilab Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure October 7, 2013 - 3:29pm Addthis Utility energy service contracting provides needed plant improvements. Photo of Project Coordinator Steve Krstulovich with Fermilab's new 1400-ton, high-efficiency chiller. Project Coordinator Steve Krstulovich with Fermilab's new 1400-ton, high-efficiency chiller. Overview The U.S. Department of Energy's (DOE's) Fermi National Accelerator Laboratory (Fermilab) has replaced old equipment and reduced energy consumption through a partnership with its electric utility, Commonwealth Edison. Fermilab upgraded the centralized cooling system and separated the system into two segments - a "comfort system" to cool the employee office

238

Los Alamos Lab: NSO: Hot Spot: Director's Papers, Reviews  

NLE Websites -- All DOE Office Websites (Extended Search)

National Security Office. The Hot Spot page lists recently published Director's papers, book reviews, etc. Director's Paper: Safeguards at 40, LANL Director Michael Anastasio (pdf)...

239

Joel Case Calcine Disposition Project Federal Project Director  

ē Results in large life-cycle cost savings through final disposition. 6 6 Basic Hot Isostatic Pressing Process ... nuclear fuel in 1964.

240

MR LLRF VXI upgrade beam study period  

Science Conference Proceedings (OSTI)

AD/RFI/LLRF group personnel performed several studies with the MR LLRF VXI upgrade system during the evening of 7/29/95. The study period lasted about 4 hours. The MR operating conditions were a mixture of $29 and $2B cycles, with beam injected only on the $29. The author believes the $2B cycles were present for reasons unrelated to the study. The basic study period goal was to test the initial VXI version of MR LLRF finite state machine (FSM) execution. This goal represents what has been called MR LLRF VXI Upgrade Implementation Stage No.2 throughout presentations and documentation on the upgrade project. The test includes control of MR LLRF NIM hardware, the MR RF cavities, and beam via XVI TTL FSM outputs. Numerous MR LLRF VXI system objects, or components, must work together correctly for a successful test. Very briefly, the required objects include VXI Front End hardware, the ACNET/Front End interface code, and the VXI/NIM Interface chassis (the chassis solves VXI-CAMAC-NIM RF and FSM output connectivity and development problems). Though this initial FSM does not yet fully support Upgrade Implementation Stage 2 functionality, all code and hardware for the following basic functionality is tested.

Mesiner, K.; /Fermilab

1995-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Department of Energy Names Director for Office of Indian Energy Policy and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Names Director for Office of Indian Energy Department of Energy Names Director for Office of Indian Energy Policy and Makes Available $2 Million for Clean Energy Projects on Tribal Lands Department of Energy Names Director for Office of Indian Energy Policy and Makes Available $2 Million for Clean Energy Projects on Tribal Lands September 14, 2007 - 2:33pm Addthis WASHINGTON, DC - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the appointment of Steven J. Morello to be Director of DOE's newly formed Office of Indian Energy Policy and Programs. As Director of this office, Mr. Morello will work to implement and manage energy planning, education and efficiency for American Indian tribes. Also today, the Secretary announced that DOE's Office of Energy Efficiency and Renewable Energy would make available a total of up to $2 million for

242

Department of Energy Names Director for Office of Indian Energy Policy and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Names Director for Office of Indian Energy Names Director for Office of Indian Energy Policy and Makes Available $2 Million for Clean Energy Projects on Tribal Lands Department of Energy Names Director for Office of Indian Energy Policy and Makes Available $2 Million for Clean Energy Projects on Tribal Lands September 14, 2007 - 2:33pm Addthis WASHINGTON, DC - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the appointment of Steven J. Morello to be Director of DOE's newly formed Office of Indian Energy Policy and Programs. As Director of this office, Mr. Morello will work to implement and manage energy planning, education and efficiency for American Indian tribes. Also today, the Secretary announced that DOE's Office of Energy Efficiency and Renewable Energy would make available a total of up to $2 million for

243

Director  

E-Print Network (OSTI)

All data are provisional. The HIV/AIDS Surveillance Supplemental Report is not copyrighted and may be used and copied without permission. Citation of the source is, however, appreciated.

unknown authors

2007-01-01T23:59:59.000Z

244

High Temperature Materials Laboratory (HTML) - PSD Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

filler A National Resource for Collaborative Materials Research The High Temperature Materials Laboratory (HTML) User Program is on hiatus due to federal budget reductions. However, research projects at the HTML still may be conducted on a cost-recovery basis through the Work for Others (WFO) Program or under a Cooperative R&D Agreement (CRADA). Dr. Edgar Lara-Curzio, HTML Director Tel: 865.574.1749 Fax: 865.574.4913 laracurzioe@ornl.gov Christine Goudy, Administrative Specialist Tel: 865.574.8295 Fax: 865.574.4913 goudyc@ornl.gov Oak Ridge National Laboratory [MST Home] [ORNL Home] [Site Index] [Search][Disclaimer] [Webmaster] Oak Ridge National Laboratory is a national multi-program research and development facility managed by UT-Battelle, LLC for the U.S. Department of Energy

245

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

confident~~al." These site names were provided to Col. Spence confident~~al." These site names were provided to Col. Spence In a subsequent letter and are not Included on the enclosed lfst. If,you have any questions regarding this letter, call me at 353-4716. Questions regarding the lfst or spedfic sites should be dlrected to Mr. Andrew Wallo of my staff at.353-5439. - Sincerely, J James J. Fiore, Director Divisjon of Facility and Site Decoainissioning Projects Office'of Nuclear Energy 3 Enclosures bee: Aerospace' NE-20 RF \,NE-23 RF Wallo RF NEG (4) x NE-23:AWallo:ph:353-5439:5/28/87:IBM:148/9: NE-23 >J.%= 5K%7 NE-23 Fiore @?f87 ENCLOSURE 1 , .., ;: v: ., . '" ._~ .> DEPARTMENT OF THE Installation/Facility 1. Alabama Ordnance Works Sylacauga, AL ;' 2. Morgantown Ordnance Works Morgantown, WV

246

Global Scratch Upgrade in Progress  

NLE Websites -- All DOE Office Websites (Extended Search)

Global Scratch Gets Global Scratch Gets an Upgrade Global Scratch Gets an Upgrade Improvements Will Include Higher Data Output Rates, Connection to PDSF October 29, 2013 The most used file system at the National Energy Research Scientific Computing Center (NERSC)-global scratch-just got an upgrade. As a result, some users may see their data output to global scratch reach up to 80 gigabytes per second. Although users will probably not see their 20-terabyte storage quotas increase, the upgrade ensures that global scratch remains flexible and paves the way for PDSF to eventually use the file system Because of the upgrade, users will also be able to better access their temporary data files or "scratch data" from any NERSC system, not just the one that generated it. Prior to the upgrade, Global scratch typically

247

Upgrading of TREAT experimental capabilities  

Science Conference Proceedings (OSTI)

The TREAT facility at the Argonne National Laboratory site in the Idaho National Engineering Laboratory is being upgraded to provide capabilities for fast-reactor-safety transient experiments not possible at any other experimental facility. Principal TREAT Upgrade (TU) goal is provision for 37-pin size experiments on energetics of core-disruptive accidents (CDA) in fast breeder reactor cores with moderate sodium void coefficients. this goal requires a significant enhancement of the capabilities of the TREAT facility, specifically including reactor control, hardened neutron spectrum incident on the test sample, and enlarged building. The upgraded facility will retain the capability for small-size experiments of the types currently being performed in TREAT. Reactor building and crane upgrading have been completed. TU schedules call for the components of the upgraded reactor system to be finished in 1984, including upgraded TREAT fuel and control system, and expanded coverage by the hodoscope fuel-motion diagnostics system.

Dickerman, C.E.; Rose, D.; Bhattacharyya, S.K.

1982-01-01T23:59:59.000Z

248

Vice President for Student Affairs Executive Director, CSU Health Network  

E-Print Network (OSTI)

Director of Medical Services Pharmacy Dental Services Laboratory Services Women's Clinic Assistant Director Behavioral Health Director of Specialty Counseling Services Drugs, Alcohol, & You (DAY) Programs i Behavioral Health Director of Business Services Accounting Student Health Insurance Human Resources Manager

249

Upgraded Coal Interest Group  

Science Conference Proceedings (OSTI)

The Upgraded Coal Interest Group (UCIG) is an EPRI 'users group' that focuses on clean, low-cost options for coal-based power generation. The UCIG covers topics that involve (1) pre-combustion processes, (2) co-firing systems and fuels, and (3) reburn using coal-derived or biomass-derived fuels. The UCIG mission is to preserve and expand the economic use of coal for energy. By reducing the fuel costs and environmental impacts of coal-fired power generation, existing units become more cost effective and thus new units utilizing advanced combustion technologies are more likely to be coal-fired.

Evan Hughes

2009-01-08T23:59:59.000Z

250

Energy Star Building Upgrade Manual  

NLE Websites -- All DOE Office Websites (Extended Search)

program helping businesses and individuals fight global warming through superior energy efficiency. ENERGY STAR Building Upgrade Manual United States Environmental Protection...

251

2011 Awards for Project Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Management The Federal Project Director of the Year for 2011: David K. Arakawa (Office of Science) The Secretary's Award of Excellence: Physical Sciences Facility Project...

252

SRS upgrades helium recovery system | National Nuclear Security  

NLE Websites -- All DOE Office Websites (Extended Search)

upgrades helium recovery system | National Nuclear Security upgrades helium recovery system | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > SRS upgrades helium recovery system SRS upgrades helium recovery system Posted By Office of Public Affairs Savannah River Site (SRS) Tritium Programs recently completed a project to design, build and relocate a new system for separating and capturing

253

Federal Finance Facilities Available for Energy Efficiency Upgrades and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Finance Facilities Available for Energy Efficiency Upgrades Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment "Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment" is a resource guide that lists the various federal financing programs for which energy efficiency and clean energy qualify - meant to make it easier for state, local and tribal leaders, along with their partners in the private sector, to find capital for energy efficiency and clean energy projects. This first-edition guide is a product of a cooperative effort among seven federal agencies, including the U.S. Departments of Agriculture, Energy, Housing and Urban Development, Transportation and Treasury, along with the

254

Federal Finance Facilities Available for Energy Efficiency Upgrades and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Finance Facilities Available for Energy Efficiency Upgrades Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment "Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment" is a resource guide that lists the various federal financing programs for which energy efficiency and clean energy qualify - meant to make it easier for state, local and tribal leaders, along with their partners in the private sector, to find capital for energy efficiency and clean energy projects. This first-edition guide is a product of a cooperative effort among seven federal agencies, including the U.S. Departments of Agriculture, Energy, Housing and Urban Development, Transportation and Treasury, along with the

255

Energy Efficiency Upgrades Part of Winning Formula for Oregon School  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Upgrades Part of Winning Formula for Oregon Upgrades Part of Winning Formula for Oregon School District Energy Efficiency Upgrades Part of Winning Formula for Oregon School District August 27, 2012 - 9:45am Addthis The community of Vernonia, OR, celebrates the opening of a new energy efficient school. | Photo courtesy of April Baer, OPB. The community of Vernonia, OR, celebrates the opening of a new energy efficient school. | Photo courtesy of April Baer, OPB. Todd G. Allen Project Officer, Golden Field Office What are the key facts? Energy efficiency upgrades will reduce the Vernonia school district's energy usage by 43 percent and save taxpayers more than $62,000 a year. The school will also serve as a laboratory for forest technologies

256

Portsmouth Gaseous Diffusion Plant Director's Final Findings and Orders, October 4, 1995  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portsmouth Gaseous Diffusion Plant Director's Final Portsmouth Gaseous Diffusion Plant Director's Final Findings and Orders, October 4, 1995 BEFORE THE OHIO ENVIRONMENTAL PROTECTION AGENCY In the Matter Of: United States Department of Energy : Director's Final Portsmouth Gaseous Diffusion Plant : Findings and Orders P.O. Box 700 : Piketon, Ohio 45661-0700 : Respondent It is hereby agreed by and among the parties hereto as follows: Table of Contents I. Jurisdiction II. Parties Bound III. Definitions IV. Findings of Fact V. Orders VI. Limitations of Director's Approval VII. Notice VIII. Project Managers IX. Dispute Resolution X. Funding XI. Other Applicable Laws XII. Reservation of Rights XIII. Modification XIV. Termination XV. Other Claims XVI. Signatories XVII. Waiver I. Jurisdiction These Director's Final Findings and Orders ("Orders") are issued to the United States

257

Los Alamos director echoes cyber concerns  

NLE Websites -- All DOE Office Websites (Extended Search)

Los Alamos director echoes cyber concerns Los Alamos director echoes cyber concerns Los Alamos director echoes cyber concerns Director Charlie McMillan told a gathering of energy executives that securing the electrical grid is a major concern now and it's only becoming more serious. May 21, 2013 Los Alamos National Laboratory Director Charlie McMillan (right), with, from left, Anthony Cugini of the National Energy Technology Laboratory, Thom Mason of Oak Ridge National Laboratory, and Tomas Diaz de la Rubia of Deloitte Consulting LLP. Los Alamos National Laboratory Director Charlie McMillan (right), with, from left, Anthony Cugini of the National Energy Technology Laboratory, Thom Mason of Oak Ridge National Laboratory, and Tomas Diaz de la Rubia of Deloitte Consulting LLP. Contact Fred deSousa

258

Principal Associate Director - Science, Technology, and Engineering  

NLE Websites -- All DOE Office Websites (Extended Search)

Principal Associate Director - Science, Technology, and Engineering Principal Associate Director - Science, Technology, and Engineering Bishop oversees directorates of Chemistry, Life, and Earth Sciences; Engineering and Engineering Sciences; Experimental Physical Sciences; Information Technology; and Theory, Simulation, and Computation. Contact Operator Los Alamos National Laboratory (505 667-5061 Bishop is a Fellow of the American Physical Society, the Institute of Physics, and the American Association for the Advancement of Science; a recipient of the Department of Energy's E.O. Lawrence Award; a Humboldt Senior Fellow; and a LANL Fellow. Alan R. Bishop Principal Associate Director for Science, Technology, and Engineering Alan R. Bishop, Acting Principal Associate Director for Science, Technology and Engineering As Principal Associate Director for Science, Technology, and Engineering,

259

Photon Sciences Directorate at Brookhaven National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Directorate at Directorate at Brookhaven National Laboratory 2010 ANNUAL REPORT DISCOVERY 2010 AnnuAl RepoRt Photon Sciences Directorate at Brookhaven National Laboratory Photon Sciences Directorate at Brookhaven National Laboratory 2010 ANNUAL REPORT Kendra Snyder Editor Laura Mgrdichian Science Writer Mona S. Rowe Science Writer Tiffany Bowman Graphic Designer Office of Science the photon Sciences Directorate at Brookhaven national laboratory operates the national Synchrotron light Source (nSlS) and is constructing the national Synchrotron light Source II (nSlS-II). nSlS and nSlS-II are offi ce of Science user Facilities supported by the u.S. Department of energy offi ce of Science. 2010 AnnuAl RepoRt Photon Sciences Directorate at Brookhaven National Laboratory Disclaimer

260

Recommendations for improvements to program and project management  

SciTech Connect

Oak Ridge National Laboratory (ORNL) has operated with a balanced matrix organization for over sixteen years. Much of the work at the Laboratory is accomplished with good customer satisfaction through programs, projects, and matrix management. During the past several years concerns about program and project management at ORNL have been expressed by both the Department of Energy and ORNL staff. In May 1993 the ORNL Division/Program/Office Directors Caucus chartered a ``fox team`` to identity and to recommend improvements to matrix management that would lead to resolution of these concerns. Nine experienced ORNL staff members served on this Matrix Management Upgrade Solutions Team (MMUST). The MMUST adopted a four-phase approach in which they first gathered information and then developed and proposed recommended actions. In the fourth phase the team was available to support implementation of the recommendations. They began work in June 1993, gathering and evaluating information in biweekly meetings for six months. Recommendations developed in October and November 1993 were presented to ORNL management in December. The MMUST issued three principal recommendations based on their evaluation of the information gathered. They are: Renew and enhance the ORNL management commitment to matrix management, program managers, and project managers; Implement actions to ensure career path parity between the program/project manager family of positions and the technical line manager family of positions across all directorates and divisions; and Clarify and document program/project manager roles, responsibilities, and authorities.

Not Available

1994-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Applicant DOE Award Project Location Project Focus Feasibility...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Authority (THRHA) 898,772 Juneau, AK The project will provide energy assessments, alternative energy monitoring, and energy conservation upgrades for low-income,...

262

Weights and Measures State Directors T - V  

Science Conference Proceedings (OSTI)

... Joe Benavides, Director for Consumer Product Protection Phone: (512) 463-5706 Fax: (888) 215-5386. Utah. Mailing Address, Contact Information. ...

2013-03-05T23:59:59.000Z

263

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

k-& +gj --%- Washington, DC 20545 Mr. Carl Schafer Director of Environmental Policy Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C....

264

Business Operations Directorate, Brookhaven National Laboratory...  

NLE Websites -- All DOE Office Websites (Extended Search)

BNL People Site Details Directorate Homepage Contact Us Divisions & Offices Budget Office Fiscal Services Division Other Information BNL Site Index Can't View PDFs? Business...

265

Chemical Sciences Division: Introduction: Director's Statement  

NLE Websites -- All DOE Office Websites (Extended Search)

Division Overview Under Construction Ali Belkacem Chemical Sciences Division Director Chemical Sciences Division Research Affiliations Our four core programs-Chemical Physics; The...

266

TMS Board of Directors: Srinivas Chada  

Science Conference Proceedings (OSTI)

He currently serves on the board of directors for The Minerals, Metals, and Materials Society (TMS) as the Chair of the Electronic, Magnetic, and Photonic†...

267

NREL: Director's Page - Interviews and Articles  

NLE Websites -- All DOE Office Websites (Extended Search)

of Let's Talk interviews NREL Director Dr. Dan Arvizu about NREL's role in American energy policy and the challenges facing renewable energy development. Dr. Arvizu also...

268

About the Deputy Director: Short Scientific Biography  

NLE Websites -- All DOE Office Websites (Extended Search)

Horst Simon is an internationally recognized expert in computer science and applied mathematics and the Deputy Director of Lawrence Berkeley National Laboratory (Berkeley Lab)....

269

Director's Office | Stanford Synchrotron Radiation Lightsource  

NLE Websites -- All DOE Office Websites (Extended Search)

Member of Technical Staff, Hewlett-Packard Co., 1978-1982. Professor (Research), Electrical Engineering, Photon Science, 1982-present. Assistant Director, SSRL, 1982-2005....

270

LLNL, LANL, Sandia directors visit Russian laboratories  

NLE Websites -- All DOE Office Websites (Extended Search)

LLNL Go Home > News > News Center > Around the Lab > 073012russian 07272012 LLNL, LANL, Sandia directors visit Russian laboratories Lauren Y Devore, LLNL, (925) 422-0855,...

271

SLAC National Accelerator Laboratory - Accelerator Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

physics. Today, the Accelerator Directorate operates and maintains SLAC's existing accelerators to provide the highest possible level of performance. Accelerator employees improve...

272

A Viewgraph from the Director  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 A Viewgraph from the Director Art Rosenfeld standing in front of a black board. Art Rosenfeld The Implementation Age: Don't Forget R&D The energy-efficiency community welcomes the federal government's renewed emphasis on implementing new technologies to save energy, money, and the environment. A product of this new direction is the Climate Change Action Plan, which aims to cap U.S. carbon dioxide emissions at 1990 levels by the year 2000. Building energy efficiency will play a major role in the plan in the form of strategies like: Increased government-industry-utility collaboration to produce ''market pull'' programs designed to boost sales of new technologies. Emphasis on retrofitting public buildings for energy efficiency, getting government to practice what it preaches.

273

A Viewgraph from the Director  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 A Viewgraph from the Director ...no one foresaw that the new cores would reveal a climatic flickering of great frequency and magnitude... Art Rosenfeld Global Warming Warning: Don't Fool with the Climate I am pleased to be able to bring you this column for the premier issue of our newsletter because it's an opportunity to present the Center's current favorite viewgraph. I hope that readers who decide the information presented here is useful will pass it along to others. Everything we develop at the Center, from hardware to policy, is aimed at saving energy and money through investments that will pay for themselves in a short time. In a rational market, these ideas sell themselves. But we now know that even before the 1973 oil embargo, when the payback time for

274

Mr. Glen Sjoblom Deputy Director  

Office of Legacy Management (LM)

J-UN 2 0 1590 J-UN 2 0 1590 Mr. Glen Sjoblom Deputy Director Di.vision of Industrial and Medical Nuclear Safety Office of Nuclear Materials Safety and Safeguards. U. S. Nuclear Regulatory C&iitii'&&; Washington, D.C. 20555 Dear Mr. Sjoblom: As a part of its Formerly Utilized Sites Remedial Action Program (FUSRAP), the U. S. Department of Energy (DOE) is trying to identify all sites and facilities where radioactive materials were handled, processed or used in support of Manhattan Engineer. District (MED) and Atomic Energy Commission (AEC) activities from 1942 through the mid-1960's. ,The authority to conduct remed,ial action under FUSRAP, derived from the Atomic Energy Act of 1954, as amended, is limited,to those sites operated prior to the establishment of AEC licensing requirements and at sites that were

275

Mr. Glen Sjoblom Deputy Director  

Office of Legacy Management (LM)

Washington, Df: 20545 Washington, Df: 20545 ,J.LlN 2 0 19% Mr. Glen Sjoblom Deputy Director Division of Industrial and Medical Nuclear Safety Office of Nuclear Materials Safety and Safeguards U. S. Nuclear Regulatory Commission r " Washington, D.C. 20555 Dear Mr. Sjoblom: As a part of its Formerly Utilized Sites Remedial Action Program (FUSRAP), the U. S. Department of Energy (DOE) is trying to identify all sites and facilities where radioactive materials were handled, processed or used in support of Manhattan Engineer District (MED) and Atomic Energy Commission (AEC) activities from 1942 through the mid-1960's. The authority to conduct remedial action under FUSRAP, derived from the Atomic Energy Act of 1954, as amendedi is limited to those sites operated prior to the

276

TO: Procurement Directors/Contracting Officers FROM: Director  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: STRIPES New Milestone Plan Process SUMMARY: A new Milestone Plan process has been implemented...

277

TO: Procurement Directors FROM: Director, Contract and Financial...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Division Office of Acquisition and Project Management SUBJECT: Hurricane Sandy Contingency Operation -- Increase in Micro-Purchase and Simplified Acquisition...

278

Upgrade of the Proton West secondary beamline  

SciTech Connect

As originally designed and operated, protons entering PW6 were steered by a series of EPB dipoles into a single interaction length beryllium target, some 43 feet from the enclosure wall. Ensuing secondary beams, either p{sup +}/{pi}{sup +} or p{sup -}/{pi}{sup -}, were collected by a string of quadrupoles following the target, steered westward, away from the Proton Center line, through PW6 and PW7, and ultimately focussed on experiment production targets located within the large PW8 hall. Around the Spring of 1988 it was decided to upgrade the existing Proton West secondary beamline to allow for transport of a primary proton beam, anticipated to be either 800 or 900 GeV/c, through PW8. This upgrade project, which is now nearing completion, was largely motivated by the then recent approval of E-771, a hadronic beauty production experiment located in PW8. E-771 represents the third in a series of experiments for the large-acceptance dimuon spectrometer presently located at the end of the Proton West beamline. This Technical Memo is a summary of the upgrade --- an explanation of the underlying strategy and a documentation of the final locations of the secondary beamline elements. 6 refs., 2 figs., 2 tabs.

Spiegel, L.

1989-10-10T23:59:59.000Z

279

DOE G 413.3-13, U.S. Department of Energy Acquisition Strategy Guide for Capital Assets Projects  

Directives, Delegations, and Requirements

This Guide serves as a tool for federal project directors developing a project acquisition strategy document. No cancellation.

2008-07-22T23:59:59.000Z

280

NSLS control system upgrade status  

SciTech Connect

The NSLS control system initially installed in 1978 has undergone several modifications but the basic system architecture remained relatively unchanged. The need for faster response, increased reliability and better diagnostics made the control system upgrade a priority. Since the NSLS runs continuously, major changes to the control system are difficult. The upgrade plan had to allow continuous incremental changes to the control system without having any detrimental effect on operations. The plan had to provide for immediate improvement in a few key areas, such as data access rates, and be complete in a short time. At present, most accelerator operations utilize the upgraded control system.

Smith, J.; Ramamoorthy, S.; Tang, Y.; Flannigan, J.; Sathe, S.; Keane, J.; Krinsky, S.

1993-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Fermilab | Directorate | Office of Integrated Planning & Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Integrated Planning & Performance Management (IPPM) Office of Integrated Planning & Performance Management (IPPM) Integrated Planning Diagram Integrated Planning Diagram [Download PPT] Mission: The Office of Integrated Planning and Performance Management (IPPM) within the Fermilab Directorate provides systems and management processes for institutional planning and performance assessment and evaluation. The office of IPPM leads multi-year, forward-looking planning and integration of institutional plans, programs, projects, operations and budgets. In addition it develops, implements and maintains integrated laboratory systems and management processes for strategic planning and goal setting, project and program oversight, enterprise risk management and performance planning and oversight. IPPM Facilitates:

282

County Partners with Siemens on Energy Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Partners with Siemens on Energy Upgrades Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades July 9, 2010 - 11:11am Addthis What does this project do? Allows McHenry County to install cutting edge technology to reduce our energy costs. When you're really committed to energy efficiency and looking at $118,000 in potential energy savings annually, you want to share it. That's the view in McHenry County, Ill., which partnered with Siemens Building Technologies to launch mchenrycounty-eecbg.net to let residents understand the connection between recent energy efficiency projects and C02 emissions. The county, located outside the Chicago metropolitan area, was awarded $2,475,900 in Energy Efficiency and Conservation Block Grant (EECBG) funds through the Recovery Act in November. Through the Recovery Act-funded

283

Non-Profit Brighter After Upgrade | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-Profit Brighter After Upgrade Non-Profit Brighter After Upgrade Non-Profit Brighter After Upgrade September 21, 2010 - 11:09am Addthis Loretta Prencipe Senior Communications Analyst, Office of Energy Efficiency & Renewable Energy In the Spring of 2010, the Arizona State Energy Program awarded Recovery Act funds to 14 non-profit organizations throughout the state for energy projects. One of the recipients, St. Vincent de Paul, is a human services organization that assists people in need throughout Central and Northern Arizona. The nonprofit partnered with Glendale, Arizona-based Natural Lighting Company to install skylights at the facility. In the above video, find out how this project is helping both the nonprofit and the local company. The video was created by Jim Arwood, an independent producer and former

284

County Partners with Siemens on Energy Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

County Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades July 9, 2010 - 11:11am Addthis What does this project do? Allows McHenry County to install cutting edge technology to reduce our energy costs. When you're really committed to energy efficiency and looking at $118,000 in potential energy savings annually, you want to share it. That's the view in McHenry County, Ill., which partnered with Siemens Building Technologies to launch mchenrycounty-eecbg.net to let residents understand the connection between recent energy efficiency projects and C02 emissions. The county, located outside the Chicago metropolitan area, was awarded $2,475,900 in Energy Efficiency and Conservation Block Grant (EECBG) funds through the Recovery Act in November. Through the Recovery Act-funded

285

Demographic Directorate 2012 Summer Internship Program  

E-Print Network (OSTI)

. This opportunity is a paid, ten-week program starting June 2012. The program offers interns an opportunity to work. The program consists of a combination of work within a particular branch, a series of training seminarsDemographic Directorate 2012 Summer Internship Program The Demographic Directorate of the United

Peterson, Blake R.

286

Prioritizing and scheduling Portsmouth Gaseous Diffusion Plant safeguards upgrades. Final report  

Science Conference Proceedings (OSTI)

As part of the Site Safeguards and Security Plan (SSSP), facilities are required to develop a Resource Plan (RP). The Resource Plan provides documentation and justification for the facility`s planned upgrades, including the schedule, priority, and cost estimates for the safeguards and security upgrades. Portsmouth Gaseous Diffusion Plant (PORTS) management has identified and obtained funding approval for a number of safeguards and security upgrades, including line-item construction projects. These upgrade projects were selected to address a variety of concerns identified in the PORTS vulnerability assessments and other reviews performed in support of the SSSP process. However, budgeting and scheduling constraints do not make it possible to simultaneously begin implementation of all of the upgrade projects. A formal methodology and analysis are needed to explicitly address the trade-offs between competing safeguards objectives, and to prioritize and schedule the upgrade projects to ensure that the maximum benefit can be realized in the shortest possible time frame. The purpose of this report is to describe the methodology developed to support these upgrade project scheduling decisions. The report also presents the results obtained from applying the methodology to a set of the upgrade projects selected by PORTS S&S management. Data for the analysis are based on discussions with personnel familiar with the PORTS safeguards and security needs, the requirements for implementing these upgrades, and upgrade funding limitations. The analysis results presented here assume continued highly enriched uranium (HEU) operations at PORTS. However, the methodology developed is readily adaptable for the evaluation of other operational scenarios and other resource allocation issues relevant to PORTS.

Edmunds, T.; Saleh, R.; Zevanove, S.

1992-02-01T23:59:59.000Z

287

Microsoft Word - CX-HatwaiSubstationUpgradesFY11_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18, 2011 18, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of secondary containment facilities at Hatwai Substation Budget Information: Work Order: 00004952 Categorical Exclusion Applied (Appendix B to Subpart D, 10 C.F.R. Part 1021): B4.6: Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to: switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms.

288

Microsoft Word - CX-AlveyMaintenanceHQ_PoleStorageUpgrade_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Environmental protection system upgrades at pole storage facility at Alvey Maintenance Headquarters. Budget Information: Work Order #00283226 Categorical Exclusion Applied (Appendix B to Subpart D, 10 C.F.R. Part 1021): B4.6: Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms.

289

Dynamic Mercury Cycling Model Upgrade  

Science Conference Proceedings (OSTI)

This technical update describes the status of activities to upgrade the Dynamic Mercury Cycling Model (D-MCM), an EPRI simulation model that predicts mercury cycling and bioaccumulation in lakes.

2008-12-17T23:59:59.000Z

290

Statement of Charles G. Groat Director, U.S. Geological Survey, U.S. Depa...rce and Agency Organization, On The Yucca Mountain Project, April 5, 2005 Congressional Testimony, 2005  

E-Print Network (OSTI)

in 1992 by the National Academy Press in a report titled Ground Water at Yucca Mountain--How High Can of affiliation with the Yucca Mountain Project, and their lack of previous involvement in evaluating Mr meeting in which fluid inclusion evidence for and against future hydrothermal upwelling at Yucca Mountain

291

User and Performance Impacts from Franklin Upgrades  

SciTech Connect

The NERSC flagship computer Cray XT4 system"Franklin" has gone through three major upgrades: quad core upgrade, CLE 2.1 upgrade, and IO upgrade, during the past year. In this paper, we will discuss the various aspects of the user impacts such as user access, user environment, and user issues etc from these upgrades. The performance impacts on the kernel benchmarks and selected application benchmarks will also be presented.

He, Yun (Helen)

2009-05-10T23:59:59.000Z

292

Director's Discretionary Research and Development Program: Annual Report, Fiscal Year 2006  

Science Conference Proceedings (OSTI)

The Director's Discretionary Research and Development Program, Annual Report Fiscal Year 2006 is an annual management report that summarizes research projects funded by the DDRD program. The NREL DDRD program comprises projects that strengthen NREL's four technical competencies: Integrated Systems, Renewable Electricity, Renewable Fuels, and Strategic Analysis.

Not Available

2007-03-01T23:59:59.000Z

293

Argonne National Laboratory Director's Postdoctoral Fellowship Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Director's Postdoctoral Fellowship Program Director's Postdoctoral Fellowship Program Instructions for Applicants Candidates for the Director's Postdoctoral Fellowships are selected based on their research and academic accomplishments, and the strength of their research proposal. They will collaborate with Argonne scientists and engineers on existing programs and on new initiatives. All applicants must identify an Argonne employee (sponsor) who will write the nomination memo and present your case in front of the Postdoctoral Committee. The sponsor could be someone who is already familiar with your research work and accomplishments through previous collaborations or professional societies. If you have not yet identified an Argonne sponsor, visit the detailed websites of the various Research

294

Director of the Office of Science Homepage | U.S. DOE Office...  

Office of Science (SC) Website

Director Home Director of the Office of Science Director Home Organization Chart .pdf file (77KB) Presentations and Testimony History Budget Contact Information Director of the...

295

Substation voltage upgrading  

SciTech Connect

Substation voltage uprating, i.e., conversion of a substation from a lower rated voltage to a higher rated voltage without a complete substation rebuild, can lead to excellent economic benefits. Utilization of the old substation layout and/or the existing equipment, to some extent, is the practical objective of such an uprating. The objective of this project was to assess the opportunities for substation uprating in the industry, to establish feasibility for such uprating and to study methods for accomplishing it. The final aim of the project was to provide guidance to utilities interested in uprating. 56 refs., 41 figs., 18 tabs.

Panek, J.; Elahi, H.; Sublich, M. (General Electric Co., Schenectady, NY (USA). Systems Development and Engineering Dept.)

1989-08-01T23:59:59.000Z

296

Economic enhancement of Western shale oil upgrading  

DOE Green Energy (OSTI)

A proof-of-concept study for a novel shale oil refining process was undertaken. This project promises reduced upgrading costs, thereby making shale oil development more feasible for commercialization. The process consists of distillation of raw shale oil into a distillate and residue portion, cracking of the residue by hydropyrolysis, and selective hydrotreating of narrow boiling cuts from the total distillate. Based on models and experimental data, the end product slate is projected to be 34% naphtha, 57% middle distillate, and 10.3% atm residue + coke. Hydrogen addition is 1.3% or 800 scf/bbl. These results are considerably improved over conventional processing, which gives 14% naphtha, 41% middle distillate, and 48.2% residue + coke and hydrogen addition of 3.2% or 2000 scf/bbl. More quantitative data and preliminary economics will be obtained in the next phase of study. 13 refs., 3 figs., 6 tabs.

Bunger, J. W.; Ryu, H.; Jeong, S. Y.

1989-07-01T23:59:59.000Z

297

Program Finds Unique Way to Fund Energy Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Finds Unique Way to Fund Energy Upgrades Program Finds Unique Way to Fund Energy Upgrades Program Finds Unique Way to Fund Energy Upgrades May 4, 2010 - 11:11am Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE The $40 million of Recovery Acts funds used for weatherizing more than 6,500 homes over the next two years in Arkansas is a welcomed boost, but Martha Jane Murray of the Clinton Foundation is thinking bigger. "How do we create a more robust delivery system that is not just relying on federal dollars," asks Martha Jane, the program director for the foundation's Arkansas Clinton Climate Initiative (CCI AR). For CCI AR, one answer is the Home Energy Affordability Loan, or HEAL, program. In a unique approach to help chip away at the list of homes in need of weatherization and lower industrial energy consumption, CCI AR developed a

298

UPGRADE OF INSTRUMENTATION FOR PURDUE REACTOR PUR-1, PHASE 3  

Science Conference Proceedings (OSTI)

The major objective of this program is to upgrade and replace instruments and equipment that significantly improve the performance, control and operational capability of the Purdue University nuclear reactor (PUR-1). Under this major objective one project on design and installation of interface cards for channel four detector was considered. This report is the final report and gives the efforts and progress achieved on these projects from August 2002 to July 2004.

S. T. Revankar

2004-09-24T23:59:59.000Z

299

Anthony Cugini Named Director of DOE's National Energy Technology...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Other Agencies You are here Home Anthony Cugini Named Director of DOE's National Energy Technology Laboratory Anthony Cugini Named Director of DOE's National Energy...

300

Contact Lee McGetrick Director, Carbon Fiber Technology Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Director, Carbon Fiber Technology Facility (865) 574-6549 mcgetricklb@ornl.gov Craig Blue, Ph.D. Director, Manufacturing Demonstration Facility (865) 574-4351...

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Los Alamos Lab: Associate Directorate for Theory, Simulation...  

NLE Websites -- All DOE Office Websites (Extended Search)

John Sarrao Deputy Associate Director, Paul Dotson Center Leader Frank Alexander Information Science and Technology Center (IS&T) Center Director for Nonlinear Studies (CNLS) Bob...

302

Los Alamos Lab: Associate Directorate for Theory, Simulation...  

NLE Websites -- All DOE Office Websites (Extended Search)

Alan Bishop Deputy Assoc. Director, Andrew (Andy) White Deputy Assoc. Director, Paul Dotson Center Leader Frank Alexander Information Science and Technology Center (IS&T) Center...

303

Secretary Bodman, Director Rumyantsev Issue Joint Statement on...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bodman, Director Rumyantsev Issue Joint Statement on Bratislava Nuclear Security Initiatives Secretary Bodman, Director Rumyantsev Issue Joint Statement on Bratislava Nuclear...

304

New director joins United Way of Northern New Mexico  

NLE Websites -- All DOE Office Websites (Extended Search)

New Director Joins United Way of Northern New Mexico Community Connections: Our link to Northern New Mexico Communities Latest Issue:November 2013 All Issues submit New director...

305

NREL: Research Participant Program - Director's Fellowship  

NLE Websites -- All DOE Office Websites (Extended Search)

Director's Fellowship Director's Fellowship View NREL's Research Participant Program Video on YouTube. The NREL Director's Fellowships are designed to attract the next generation of exceptionally qualified scientists and engineers with outstanding talent and credentials in renewable energy research and related disciplines. Candidates must be a recent PhD graduate (within two years of completion), and demonstrate a promising career of leadership and research. Candidates will be selected based on eligibility, program expectations, and research proposals. Overriding consideration, when evaluating the application, will be the quality of the candidate. Successful candidates will serve a two-year term, with a possible third year renewal paid with program funding (maximum three year-appointments). The Director's

306

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

45 UY 2 9 1987 Mr. Carl Schafer Director of Environmental Policy Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C. 20301 Dear Mr....

307

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

i+ r*y Washington, DC 20545 Mr. Carl Schafer Director of Environmental Policy Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C. 20301...

308

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

my 2 9 1987 Mr. Carl Schafer Director of Environmental Policy Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C. 20301 Dear Mr....

309

Director Position Center for Urban Transportation  

E-Print Network (OSTI)

Director Position Center for Urban Transportation The Center for Urban Transportation Research for state policymakers, transportation agencies, transportation professionals and the public. CUTR conducts of Transportation's Federal Transit Administration and Federal Highway Administration, the Florida Department

Arslan, H√ľseyin

310

Baylis named new director of Diversity Programs  

NLE Websites -- All DOE Office Websites (Extended Search)

University of Puerto Rico. Photo by Carrie MartinLLNL Baylis named new director of Diversity Programs Carenda L Martin, LLNL, (925) 424-4175, martin59@llnl.gov High Resolution...

311

University Admissions: ValeriePickett,Director  

E-Print Network (OSTI)

University Admissions: ValeriePickett,Director UniversityAdmissions,MSC3A New, Appointed Regent from Clovis for term expiring January 1, 2011. Chris Anaya, Appointed Regent from Moriarty

Castillo, Steven P.

312

Energy Upgrade Program Revitalizing Oregon | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Upgrade Program Revitalizing Oregon Energy Upgrade Program Revitalizing Oregon Energy Upgrade Program Revitalizing Oregon May 28, 2010 - 2:38pm Addthis Joshua DeLung What does this project do? Local businesses in 13 communities are getting energy makeovers in an effort to help business owners save hundreds of dollars each year and revitalize downtown areas. 'Main streets' in Clackamas County, Oregon, are undergoing a makeover - an energy-efficiency makeover. As part of the Clackamas County Energy Efficiency on Main Street Program, local businesses in 13 communities are getting energy makeovers in an effort to help business owners save hundreds of dollars each year and revitalize downtown areas. First to save The program needed a guinea pig to be the first to receive a free energy audit and found a willing participant in Key Carpets, a Molalla-based store

313

Forsyth County Slashes Energy Bills with Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades September 30, 2010 - 12:04pm Addthis A new energy management system in Forsyth County√ʬĬôs 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County A new energy management system in Forsyth County's 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County Maya Payne Smart Former Writer for Energy Empowers, EERE What are the key facts? Four large projects funded through Recovery Act grant Energy efficient retrofits to save county about $72,000 annually Forsyth County, Georgia has been among the nation's fastest growing counties for the past ten years. Given the growth, officials are working

314

Microsoft Word - CX_MerrittRadioStationUpgrade_2013.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2013 8, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Merritt Radio Station Upgrade Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Microwave, meteorological, and radio towers Location: Winton, Chelan County, WA Township 26N, Range 16E, and Section 2 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA plans to upgrade its Merritt Radio Station in the Wenatchee River Ranger District of the Okanogan-Wenatchee National Forest (USFS). The proposed radio station upgrade would replace the existing communication building, electrical service, and propane tank with a new building and propane tank in adjacent locations on the

315

Forsyth County Slashes Energy Bills with Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades September 30, 2010 - 12:04pm Addthis A new energy management system in Forsyth County√ʬĬôs 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County A new energy management system in Forsyth County's 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County Maya Payne Smart Former Writer for Energy Empowers, EERE What are the key facts? Four large projects funded through Recovery Act grant Energy efficient retrofits to save county about $72,000 annually Forsyth County, Georgia has been among the nation's fastest growing counties for the past ten years. Given the growth, officials are working

316

When Energy Efficiency Upgrades and Ghost Stories Meet | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet October 31, 2011 - 5:21pm Addthis Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Tertia Speiser Project Officer, Golden Field Office What are the key facts? New heating and cooling equipment has saved the Homewood Public Library thousands of dollars a year. It hasn't done anything about the ghosts, though. I've always thought that the best ghost stories are found in books. But what happens when the building where the books are kept is also a ghost story? Such may be the case with the award-winning public library in Homewood, Alabama, a city of 23,000 just south of Birmingham.

317

Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade March 16, 2011 - 2:58pm Addthis April Saylor April Saylor Former Digital Outreach Strategist, Office of Public Affairs What does this project do? In three hours, enough energy is recovered from the TMC to heat 15 loads of water for L&N's largest-capacity washing machine, and enough water is recovered to fill 1-1/2 loads of that same machine. As the provider of laundry and dry cleaning services for Disneyland Resort's costumes and hospitality supply items, L&N Costume and Linen Service knows a little something about both quantity and quality. Now, with the help of the Gas Technology Institute (GTI) and the Department of Energy, this forward-looking enterprise is embracing new, clean energy

318

Living Comfortably: A Consumer's Guide to Home Energy Upgrades |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Living Comfortably: A Consumer's Guide to Home Energy Upgrades Living Comfortably: A Consumer's Guide to Home Energy Upgrades Living Comfortably: A Consumer's Guide to Home Energy Upgrades March 7, 2013 - 3:15pm Addthis A weatherization worker drills holes to blow cellulose insulation in the interior walls of this home. | Photo courtesy of Dennis Schroeder, NREL A weatherization worker drills holes to blow cellulose insulation in the interior walls of this home. | Photo courtesy of Dennis Schroeder, NREL Dr. Richard Knaub Project Leader in Weatherization & Workforce Development at the National Renewable Energy Laboratory Energy audit tools An infrared camera can display temperature differences between surfaces and help determine if a wall is insulated. It can show drafts and moisture, which can lead to mold problems.

319

When Energy Efficiency Upgrades and Ghost Stories Meet | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet October 31, 2011 - 5:21pm Addthis Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Tertia Speiser Project Officer, Golden Field Office What are the key facts? New heating and cooling equipment has saved the Homewood Public Library thousands of dollars a year. It hasn't done anything about the ghosts, though. I've always thought that the best ghost stories are found in books. But what happens when the building where the books are kept is also a ghost story? Such may be the case with the award-winning public library in Homewood, Alabama, a city of 23,000 just south of Birmingham.

320

Rehabilitating and Upgrading Hydropower Plants: A Hydropower Technology Round-Up Report, Volume 2  

Science Conference Proceedings (OSTI)

Owners of aging hydropower plants are confronted with an array of project and technology options for rehabilitating or upgrading their facilities and are making large capital investment decisions at a time of increasing competitive pressures. Ensuring that investments in plant are optimal requires a thorough understanding of the technologies, approaches and strategies available for rehab and upgrading -- as well as the risks associated with these projects. This volume of EPRI's Hydropower Technology Roun...

1999-10-28T23:59:59.000Z

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

upgrade | OpenEI Community  

Open Energy Info (EERE)

4 4 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235354 Varnish cache server upgrade Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 22 October, 2012 - 07:23 Semantic Mediawiki Semantic Forms update developer Incentives and Policies Semantic Mediawiki upgrade Utility Rates We have just updated Semantic Forms on OpenEI to version 2.4 to enable some upgrades to the utility rate forms (thanks Teresa!). If you see any problems in forms you use on OpenEI, please notify us by commenting on this

322

The D0 detector upgrade  

SciTech Connect

The Fermilab collider program is undergoing a major upgrade of both the accelerator complex and the two detectors. Operation of the Tevatron at luminosities upwards of ten time that currently provided will occur in early 1999 after the commissioning of the new Fermilab Main Injector. The D0 upgrade program has been established to deliver a detector that will meet the challenges of this environment. A new magnetic tracker consisting of a superconducting solenoid, a silicon vertex detector, a scintillating fiber central tracker, and a central preshower detector will replace the current central tracking and transition radiation chambers. We present the design and performance capabilities of these new systems and describe results from physics simulations that demonstrate the physics reach of the upgraded detector.

Bross, A.D.

1995-02-01T23:59:59.000Z

323

ENERGY STAR Building Upgrade Manual Chapter 9: Heating and Cooling...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 9: Heating and Cooling Upgrades The Building Upgrade...

324

JGI - Project List  

NLE Websites -- All DOE Office Websites (Extended Search)

ID NCBI taxonomy ID Show projects from: all ARRA BRC-BESC BRC-GLBRC BRC-JBEI BRC-Multi CSP CSP-ICBG CSP-LD DD Director's Science DOE Legacy DOEM FGP GEBA Genomic Tech Grand...

325

MEMORANDUM FROM: THOMAS E. BROWN, DIRECTOR OFFICE OF CONTRACT MANAGEMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

,2008 ,2008 MEMORANDUM FROM: THOMAS E. BROWN, DIRECTOR OFFICE OF CONTRACT MANAGEMENT OFFICE OF PROCUREMENT AND ASSISTANCE MANAGEMENT SUBJECT: Contract Change Order Administration of Department of Energy Prime Contracts The purpose of this memorandum is to highlight the need for good contract administration of Department of Energy (DOE) contracts (non management and operating contracts) including those covered by DOE Order 413.3A, Program and Project Management for the Acquisition of Capital Assets. One of the focus areas of the DOE's efforts to improve contract and project management is the recopition that effectrve contract change order administration is critical to ensuring that contract and project requirements are met. Fundamentally, the award of an appropriate contract type that best

326

Posted CX Q14 Sprinkler System Upgrade.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(NEPA) Categorical Exclusion (eX) (NEPA) Categorical Exclusion (eX) Determination Summary Form Q14 Sprinkler System Upgrade Project REFERENCE J 10 CFR Part 1021 , Department of Energy National Environmental Policy Act Implementation Procedures, Subpart 0 , Typical Classes of Actions PROJECT SCOPE DISCUSSION The project scope will upgrade the Q14 sprinkler system to meet exposed plastic design basis requirements by installing a fire pump and performing modifications to the Q14 sprinkler piping. The fire pump will be a pre-assembled skid system with enclosure diesel powered pump and associated diesel storage tank. The fire pump assembly wi ll be located on a foundation pad in the grassy area ,;!orthwest of 014. Electrical work will include providing general power to the fire pump building and fire pump control/alarm wiring to a fire alarm panel in the 014

327

2011 Computation Directorate Annual Report  

SciTech Connect

From its founding in 1952 until today, Lawrence Livermore National Laboratory (LLNL) has made significant strategic investments to develop high performance computing (HPC) and its application to national security and basic science. Now, 60 years later, the Computation Directorate and its myriad resources and capabilities have become a key enabler for LLNL programs and an integral part of the effort to support our nation's nuclear deterrent and, more broadly, national security. In addition, the technological innovation HPC makes possible is seen as vital to the nation's economic vitality. LLNL, along with other national laboratories, is working to make supercomputing capabilities and expertise available to industry to boost the nation's global competitiveness. LLNL is on the brink of an exciting milestone with the 2012 deployment of Sequoia, the National Nuclear Security Administration's (NNSA's) 20-petaFLOP/s resource that will apply uncertainty quantification to weapons science. Sequoia will bring LLNL's total computing power to more than 23 petaFLOP/s-all brought to bear on basic science and national security needs. The computing systems at LLNL provide game-changing capabilities. Sequoia and other next-generation platforms will enable predictive simulation in the coming decade and leverage industry trends, such as massively parallel and multicore processors, to run petascale applications. Efficient petascale computing necessitates refining accuracy in materials property data, improving models for known physical processes, identifying and then modeling for missing physics, quantifying uncertainty, and enhancing the performance of complex models and algorithms in macroscale simulation codes. Nearly 15 years ago, NNSA's Accelerated Strategic Computing Initiative (ASCI), now called the Advanced Simulation and Computing (ASC) Program, was the critical element needed to shift from test-based confidence to science-based confidence. Specifically, ASCI/ASC accelerated the development of simulation capabilities necessary to ensure confidence in the nuclear stockpile-far exceeding what might have been achieved in the absence of a focused initiative. While stockpile stewardship research pushed LLNL scientists to develop new computer codes, better simulation methods, and improved visualization technologies, this work also stimulated the exploration of HPC applications beyond the standard sponsor base. As LLNL advances to a petascale platform and pursues exascale computing (1,000 times faster than Sequoia), ASC will be paramount to achieving predictive simulation and uncertainty quantification. Predictive simulation and quantifying the uncertainty of numerical predictions where little-to-no data exists demands exascale computing and represents an expanding area of scientific research important not only to nuclear weapons, but to nuclear attribution, nuclear reactor design, and understanding global climate issues, among other fields. Aside from these lofty goals and challenges, computing at LLNL is anything but 'business as usual.' International competition in supercomputing is nothing new, but the HPC community is now operating in an expanded, more aggressive climate of global competitiveness. More countries understand how science and technology research and development are inextricably linked to economic prosperity, and they are aggressively pursuing ways to integrate HPC technologies into their native industrial and consumer products. In the interest of the nation's economic security and the science and technology that underpins it, LLNL is expanding its portfolio and forging new collaborations. We must ensure that HPC remains an asymmetric engine of innovation for the Laboratory and for the U.S. and, in doing so, protect our research and development dynamism and the prosperity it makes possible. One untapped area of opportunity LLNL is pursuing is to help U.S. industry understand how supercomputing can benefit their business. Industrial investment in HPC applications has historic

Crawford, D L

2012-04-11T23:59:59.000Z

328

2011 Computation Directorate Annual Report  

SciTech Connect

From its founding in 1952 until today, Lawrence Livermore National Laboratory (LLNL) has made significant strategic investments to develop high performance computing (HPC) and its application to national security and basic science. Now, 60 years later, the Computation Directorate and its myriad resources and capabilities have become a key enabler for LLNL programs and an integral part of the effort to support our nation's nuclear deterrent and, more broadly, national security. In addition, the technological innovation HPC makes possible is seen as vital to the nation's economic vitality. LLNL, along with other national laboratories, is working to make supercomputing capabilities and expertise available to industry to boost the nation's global competitiveness. LLNL is on the brink of an exciting milestone with the 2012 deployment of Sequoia, the National Nuclear Security Administration's (NNSA's) 20-petaFLOP/s resource that will apply uncertainty quantification to weapons science. Sequoia will bring LLNL's total computing power to more than 23 petaFLOP/s-all brought to bear on basic science and national security needs. The computing systems at LLNL provide game-changing capabilities. Sequoia and other next-generation platforms will enable predictive simulation in the coming decade and leverage industry trends, such as massively parallel and multicore processors, to run petascale applications. Efficient petascale computing necessitates refining accuracy in materials property data, improving models for known physical processes, identifying and then modeling for missing physics, quantifying uncertainty, and enhancing the performance of complex models and algorithms in macroscale simulation codes. Nearly 15 years ago, NNSA's Accelerated Strategic Computing Initiative (ASCI), now called the Advanced Simulation and Computing (ASC) Program, was the critical element needed to shift from test-based confidence to science-based confidence. Specifically, ASCI/ASC accelerated the development of simulation capabilities necessary to ensure confidence in the nuclear stockpile-far exceeding what might have been achieved in the absence of a focused initiative. While stockpile stewardship research pushed LLNL scientists to develop new computer codes, better simulation methods, and improved visualization technologies, this work also stimulated the exploration of HPC applications beyond the standard sponsor base. As LLNL advances to a petascale platform and pursues exascale computing (1,000 times faster than Sequoia), ASC will be paramount to achieving predictive simulation and uncertainty quantification. Predictive simulation and quantifying the uncertainty of numerical predictions where little-to-no data exists demands exascale computing and represents an expanding area of scientific research important not only to nuclear weapons, but to nuclear attribution, nuclear reactor design, and understanding global climate issues, among other fields. Aside from these lofty goals and challenges, computing at LLNL is anything but 'business as usual.' International competition in supercomputing is nothing new, but the HPC community is now operating in an expanded, more aggressive climate of global competitiveness. More countries understand how science and technology research and development are inextricably linked to economic prosperity, and they are aggressively pursuing ways to integrate HPC technologies into their native industrial and consumer products. In the interest of the nation's economic security and the science and technology that underpins it, LLNL is expanding its portfolio and forging new collaborations. We must ensure that HPC remains an asymmetric engine of innovation for the Laboratory and for the U.S. and, in doing so, protect our research and development dynamism and the prosperity it makes possible. One untapped area of opportunity LLNL is pursuing is to help U.S. industry understand how supercomputing can benefit their business. Industrial investment in HPC applications has historically been limited by the prohibitive cost of entry

Crawford, D L

2012-04-11T23:59:59.000Z

329

Finance Human Resources & Training Information Systems Director Director Director Technology Officer Operations & Maintenance  

E-Print Network (OSTI)

Maintenance Construction Project Management 982-5048 or esm3e Recycling Annette Cyphers Richard Barbour Safety-5891 or ltw Systems Control Center 982-5876 or pgz5z Health System Research Zone 2 Maintenance 982-4776 or bks Administration Zone 3 Maintenance Mike Merriam Sally Fields Will Schnorr Utility Systems Jeff Moore, P.E. David

Acton, Scott

330

NIST Testimony by Philip Singerman, NIST Associate Director ...  

Science Conference Proceedings (OSTI)

NIST Testimony by Philip Singerman, NIST Associate Director for Innovation & Industry Services. NIST Testimony by Philip ...

2012-08-13T23:59:59.000Z

331

NIST Testimony by Willie E. May, Director, Chemical Science ...  

Science Conference Proceedings (OSTI)

NIST Testimony by Willie E. May, Director, Chemical Science and Technology Laboratory. 2013. 032013 Testimony House ...

2013-09-24T23:59:59.000Z

332

Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption  

Science Conference Proceedings (OSTI)

The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the technical feasibility and cost of upgrading low-BTU methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys modular microchannel process technology. The objective of Phase II is to demonstrate the process at the bench-scale. Natural gas upgrading systems have six main unit operations: feed compressor, dehydration unit, nitrogen rejection unit, deoxygenator, carbon dioxide scrubber, and a sales compressor. The NRU is the focus of the development program, and a bench-scale demonstration has been initiated. The Velocys NRU system targets producing methane with greater than 96% purity and at least 90% recovery for final commercial operation. A preliminary cost analysis of the methane upgrading system, including the Velocys NRU, suggests that costs below $2.00 per million (MM) BTU methane may be achieved. The cost for a conventional methane upgrading system is well above $2.30 per MM BTU, as benchmarked in an Environmental Protection Agency study. The project is on schedule and on budget. Task 4, a bench-scale demonstration of the ultra-fast TSA system is complete. Rapid thermal swing of an adsorbent bed using microchannels has been successfully demonstrated and the separation of a 70% methane and 30% nitrogen was purified to 92% methane. The bench-scale demonstration unit was small relative to the system dead volume for the initial phase of experiments and a purge step was added to sweep the dead volume prior to desorbing the bed and measuring purity. A technical and economic feasibility assessment was completed in Task 3. The proposed Velocys technology appears feasible for the methane upgrading market. Evaluated categories include adsorbent selection, rapid-cycle valve selection, microchannel manufacturability assessment, and system design and cost. The selected adsorbent, granular microporous carbon from either Barnaby-Sutcliffe or Calgon, experimentally demonstrated sufficient methane capacity under differential temperature at 100 pounds per square inch gauge. Several valve options were identified, including candidates that can operate millions of cycles between refurbishment. The microchannel adsorber and desorber designs were made using internal Velocys manufacturability standards, and the associated costs are acceptable as included with the complete nitrogen rejection unit (NRU) cost projection. A system design and cost estimate was completed for the NRU section of the methane upgrading system. As integrated into the complete system, the cost is in line with the market requirement.

Anna Lee Tonkovich

2005-07-01T23:59:59.000Z

333

Program & Project Management For The Acquisition Of Capital Assets  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 2009 Office of Management Office of Engineering and Construction Management Operational Organization Chart (FY 09) Office of Engineering & Construction Management POLICY - GUIDANCE -OVERSIGHT Pete Check Deputy Director Les Novitsky - Management Analyst Rosalyn Matthews - Program Support Specialist EIR Program Analyst (NISC) - Monica Morris Pete Check Deputy Director Les Novitsky - Management Analyst Rosalyn Matthews - Program Support Specialist EIR Program Analyst (NISC) - Monica Morris Robert Raines Director for Project Management Systems & Assessments Robert Raines Director for Project Management Systems & Assessments Peter O'Konski Director for Facilities Management & Professional Development Peter O'Konski Director for Facilities Management & Professional Development

334

Fermilab | Director's Policy Manual | Home  

NLE Websites -- All DOE Office Websites (Extended Search)

Fermilab Document Hierarchy Fermilab Document Hierarchy Fermilab Policies Assessments Assurance Program Code of Business Ethics & Conduct Combating Trafficking in Persons Community Outreach Computing Construction/Modification Demonstrations Design Document Control Environment Experimenters/Users ID Facility Reuse Program Fermilab Employee Assignments to non-US Institutions while Awaiting Visa Renewals Fermilab Scientific Appointments Financial Management Freedom of Information Act Requests Guest Appointments Inclement Weather and Snow Policy Interactions with Legislators Issues Management Maintenance MOUs Between Fermilab & Foreign Partners Operations Personally Identifiable Information Procurement Project Management Property Quality Assurance Records Management Policy Requests for Easements or License

335

Moab Uranium Mill Tailings Cleanup Project Steps into Spotlight at  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Uranium Mill Tailings Cleanup Project Steps into Spotlight at Uranium Mill Tailings Cleanup Project Steps into Spotlight at International Meeting in Vienna Moab Uranium Mill Tailings Cleanup Project Steps into Spotlight at International Meeting in Vienna October 22, 2012 - 12:00pm Addthis Moab Federal Project Director Donald Metzler presents at the Uranium Mining Remediation Exchange Group meeting in Germany in September 2011. Moab Federal Project Director Donald Metzler presents at the Uranium Mining Remediation Exchange Group meeting in Germany in September 2011. Moab Federal Project Director Donald Metzler Moab Federal Project Director Donald Metzler Moab Federal Project Director Donald Metzler presents at the Uranium Mining Remediation Exchange Group meeting in Germany in September 2011. Moab Federal Project Director Donald Metzler

336

Boston College Facilities Management Summer Projects 2013  

E-Print Network (OSTI)

# Building / Location Project Description Resp Mgr Project Mgr 1 8131515 2000 Comm Ave Cooling Towers : This project completes this phase of the renewal of 2000 Commonwealth Ave with cooling tower upgrades. Mike split system for the UPS room. Terence Leahy Terence Leahy 9 8141205 Carney Hall Cooling Tower Upgrades

Huang, Jianyu

337

Lab resumes work on NMSSUP security project  

NLE Websites -- All DOE Office Websites (Extended Search)

by the weather. I expect a full restart in the late March timeframe." Facility, nuclear material remain secure The Nuclear Material Safeguards and Security Upgrade Project...

338

CATEGORICAL EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES, EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES, 300 AREA, HANFORD SITE, RICHLAND, WASHINGTON Proposed Action: The U.S. Department of Energy (DOE), Pacific Northwest Site Office (PNSO) proposes to upgrade a landscaping irrigation system in the 300 Area. Location of Action: In the landscaped area around the 331 Building, Hanford Site Description of the Proposed Action: The proposed action is to upgrade the existing 331 Building landscaping irrigation system by using nearby aquaculture effluent instead of

339

DOE G 413.3-15, Department of Energy Guide for Project Execution Plans  

Directives, Delegations, and Requirements

This directive provides guidance for the federal project director to produce a useful and flexible plan. No cancellation.

2008-09-12T23:59:59.000Z

340

EMS, FUA and SAD/ASE Checklist for Photon Sources Directorate Reviews  

NLE Websites -- All DOE Office Websites (Extended Search)

January 2, 2009 (Rev. 9) more . . . Page 2 of 7 January 2, 2009 (Rev. 9) more . . . Page 2 of 7 EMS, FUA and SAD/ASE Checklist for Photon Sources Directorate Reviews (Photon Sources Directorate ES&H personnel and the Environmental Compliance Representative can assist in completing this form) Review Committee: Laboratory ESH Committee Date: 08Dec2011 Project Name (and # if any): NSLS-II USI #2 This checklist identifies issues associated with this project that may impact the Directorate Environmental Management System, Occupational Health & Safety Management System, Facility Use Agreements, Safety Assessment Documents & Accelerator Safety Envelopes, and NEPA documents. This checklist will be completed during a review process, if needed, and form part of the documentation of that review.

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

AVIATION BOARD OF DIRECTORS BYLAWS AND PROTOCOLS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AVIATION BOARD OF DIRECTORS AVIATION BOARD OF DIRECTORS BYLAWS AND PROTOCOLS The Department of Energy strives to manage its Aviation Program toward the highest standards of safety, efficiency, fairness in contracting, preservation of competition in the private sector, open communication, prudent property management, and the best examples of resource management. Toward these ends, the Department has established a management structure led by a Board of Directors comprising active Federal employee aviation managers from the Department. AUTHORITY: The following authorities serve as basis for this structure and system: Office of Management and Budget Circular A-126, FMR 102.33, DEAR 109, DOE Order 440.2B, Aviation Management Review Team Report, March 1999, and Secretary of Energy Appointment and Delegation of Authority, April 15, 1999.

342

APS Director Stephenson Named Argonne Distinguished Fellow  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Photon Source, Canadian Light Source Strengthen Ties, Expand X-ray Advanced Photon Source, Canadian Light Source Strengthen Ties, Expand X-ray Technology and Research Rose of APS and CNM One of Four DOE Early Career Award Winners Scientists Close-In on Artificial Spider Silk Ekiert Earns 2012 APSUO Franklin Award for Studies of Influenza Virus Clever Apes on WBEZ: Breaking the Fossil Record APS News Archives: 2012 | 2011 | 2010 | 2009 2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed APS Director Stephenson Named Argonne Distinguished Fellow JULY 19, 2012 Bookmark and Share Brian Stephenson Brian Stephenson has been named one of five Argonne National Laboratory Distinguished Fellows for 2012. Stephenson is the Argonne Associate Laboratory Director for Photon Sciences and Director of the U.S. Department

343

Investment and Upgrade in Distributed Generation under Uncertainty  

E-Print Network (OSTI)

AS, Marnay, C. Distributed generation investment by aand Upgrade in Distributed Generation under Uncertaintyand Upgrade in Distributed Generation under Uncertainty ?

Siddiqui, Afzal

2008-01-01T23:59:59.000Z

344

Substation voltage upgrading  

SciTech Connect

This report addresses specific issues to support sound yet not unduly conservative uprating practices for substations. The main parts of the report cover the insulation withstand and overvoltage protection aspects, environmental measurements, reliability criteria, and industry experience. First the insulation design concerns are addressed. Substation stress by a backflashover of the line insulation due to lightning in the vicinity of the substation is recognized as a critical stress. A representative part of a 550 kV BIL substation was erected at the EPRI High Voltage Transmission Research Center, where also a special test circuit was assembled to produce a fast front, slow tail (0.2/200 {mu}s) wave. The substation as well as some special configurations were tested for line-to-ground and line-to-line withstand. Computer studies were performed to complement the test results. A number of important conclusions was reached. The most prominent result in that the high frequency oscillations, as caused by reflections within the substation, do not effect the Critical Flashover Voltage (CFO). The present practice, based on the highest peak is therefore very conservative. The slow tail of the wave appears to dictate the CFO. An arrester model for computer studies to represent very fast as well as slow phenomena was derived. It is based on full scale arrester test data, made available in this project. The computer program to calculate arrester model parameters is also a part of the report. The electric environmental measurements are reported for the tested substation at the HVTRC and for the uprated substation of Public Service Company of Colorado, both before and after the uprating. The performance is satisfactory when corona free hardware is used. Insulation design criteria are analyzed based on substation reliability, the system viewpoint and consequences of the failure. Utility experience with uprated substations is reviewed.

Panek, J.; Elahi, H.; Lux, A.; Imece, A.F. (General Electric Co., Schenectady, NY (United States). Power Systems Engineering Dept.); LaPanse, R.A.; Stewart, J.R. (Public Service Co. of Colorado, Denver, CO (United States))

1992-04-01T23:59:59.000Z

345

Materials Science and Technology Division - Physical Sciences Directorate -  

NLE Websites -- All DOE Office Websites (Extended Search)

ABD ABD For the Public Visiting ORNL For Researchers Profiles Group Leader Staff Members Facilities For Industry Research Projects Our People Group Leader, Staff Members, Facilities Find People Energy Frontier Research Center Center for Defect Physics (EFRC) User Facilities High Temperature Materials Laboratory (HTML) Shared Research Equipment User Facility (ShaRE) Related User Facilities Center for Nanophase Materials Sciences (CNMS) High Flux Isotope Reactor (HFIR) Spallation Neutron Source (SNS) Seminars and Announcements MSTD Internal Recent News & Features News Releases Archive | Features Archive PSD Directorate ‚Äļ MST Division ‚Äļ Alloy Behavior and Design Group The principal technical contact for discussing potential projects in the Alloy Behavior and Design Group is Dr. Easo P. George, Group Leader.

346

Kansas Advanced Semiconductor Project  

SciTech Connect

KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

2007-09-21T23:59:59.000Z

347

Microsoft Word - Lower-MidColumbia-Upgrade-CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Steve Prickett Project Manager - TEP Proposed Action: Lower Mid-Columbia / Midway-Vantage 230-kV Transmission Line Upgrade Project Budget Information: Work Order #238901 and #231311, Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility..." B4.7 Adding fiber optic cable to transmission structures or burying fiber optic cable in existing transmission line rights-of-way. B4.13 "Reconstruction (upgrading or rebuilding) and/or minor relocation of existing electric powerlines

348

Microsoft Word - CX_MetalineRadioStationUpgrade_2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 11, 2012 July 11, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Metaline Radio Station Upgrade Project Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19- Siting/construction/operation of microwave/radio communication towers Location: Metaline Falls, Pend Orielle County, WA Township 40N, Range 43E, Section 31 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade its Metaline Radio Station in the Sullivan Lake Ranger District of the Colville National Forest. BPA is coordinating with the US Forest Service (USFS) to ensure the existing land use agreement is modified to adequately address

349

Jefferson Lab 12 GeV CEBAF Upgrade  

Science Conference Proceedings (OSTI)

The existing continuous electron beam accelerator facility (CEBAF) at Thomas Jefferson National Accelerator Facility (TJNAF) is a 5-pass, recirculating cw electron Linac operating at ~6 GeV and is devoted to basic research in nuclear physics. The 12 GeV CEBAF Upgrade is a $310 M project, sponsored by the Department of Energy (DOE) Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. The project received construction approval in September 2008 and has started the major procurement process. The cryogenic aspects of the 12 GeV CEBAF Upgrade includes: doubling the accelerating voltages of the Linacs by adding ten new high-performance, superconducting radiofrequency (SRF) cryomodules (CMs) to the existing 42 1/4 cryomodules; doubling of the 2 K cryogenics plant; and the addition of eight superconducting magnets.

Claus Rode

2010-04-01T23:59:59.000Z

350

About: Why Energy Efficiency Upgrades  

NLE Websites -- All DOE Office Websites (Extended Search)

Why Energy Efficiency Upgrades Why Energy Efficiency Upgrades Two photos side by side showing energy loss through the use of infrared technology. As part of a home energy evaluation, an energy professional can use an infrared camera to pinpoint where air leaks and drafts are occurring in your home or building. Although normally difficult to see, these infrared photos clearly show in color where energy losses are occurring in a typical house. How We Use Energy in Our Buildings How We Use Energy in Our Homes (% of Energy Consumption) A pie chart illustrating the following breakdown: Space heating 43%, space cooling 9.7%, water heating 17.1%, lighting 6.2%, refrigeration 3.9%, electronics 3%, wet cleaning 3.2%, cooking 3.1%, computers 1.6%. Source: 2010 Buildings Energy Data Book, Table 2.1.6

351

MIPP Plastic Ball electronics upgrade  

SciTech Connect

An upgrade electronics design for Plastic Ball detector is described. The Plastic Ball detector was a part of several experiments in the past and its back portion (proposed to be used in MIPP) consists of 340 photomultipliers equipped with a sandwich scintillator. The scintillator sandwich has fast and slow signal component with decay times 10 ns and 1 {micro}s respectively. The upgraded MIPP experiment will collect up to 12,000 events during each 4 second spill and read them out in {approx}50 seconds between spills. The MIPP data acquisition system will employ deadtime-less concept successfully implemented in Muon Electronics of Dzero experiment at Fermilab. An 8-channel prototype design of the Plastic Ball Front End (PBFE) implementing these requirements is discussed. Details of the schematic design, simulation and prototype test results are discussed.

Baldin, Boris; /Fermilab

2009-01-01T23:59:59.000Z

352

The FNAL Injector Upgrade Status  

SciTech Connect

The new FNAL H{sup -} injector upgrade is currently being tested before installation in the Spring 2012 shutdown of the accelerator complex. This line consists of an H{sup -} source, low energy beam transport (LEBT), 200 MHz RFQ and medium energy beam transport (MEBT). Beam measurements have been performed to validate the design before installation. The results of the beam measurements are presented in this paper.

Tan, C.Y.; Bollinger, D.S.; Duel, K.L.; Karns, P.R.; Lackey, J.R.; Pellico, W.A; Scarpine, V.E.; Tomlin, R.E.; /Fermilab

2012-05-14T23:59:59.000Z

353

DIRECTORS' REPORT 2 2002 HIGHLIGHTS 4  

E-Print Network (OSTI)

, such as required in the hot carrier cell 1. DIRECTORS' REPORT 2 ARC SPECIAL RESEARCH CENTRE FOR THIRD GENERATION-conversion of photon energy (Sec. 9) and hot carrier cells (Sec. 10). In addition, work on another area, that of ther-old idea of lumines- cent solar concentrators. Hot carrier cells have been the focus of a third strand

354

Energy Technology Program Director: Ashley Preston  

E-Print Network (OSTI)

Energy Technology Program Director: Ashley Preston Phone: 406.243.7915 Email: Ashley.Preston@UMontana.edu ace.cte.umt.edu/energy The Energy Technology Program is an online program that introduces students to the full suite of energy technologies--traditional, emerging, renewable, and alternative--and prepares them

Crone, Elizabeth

355

Interlocking Directorates and Business Groups: Belgian Evidence  

E-Print Network (OSTI)

We investigate the determinants of interlocking directorates and their impact on company performance for a Belgian sample of 286 companies affiliated with a business group and 2,136 stand-alone companies. Most of these companies are not listed. We find that companies belonging to a group have much more interlocking directorates than stand-alone companies. Group companies tend to be strongly interlocked with other group members, including parent companies, and they have more intra-group interlocks when they are located at a higher hierarchical group level. Group companies have more vertical interlocks when they are involved in an internal capital market and when they are affiliated with a diversified business group. We also find that while interlocking directorates are negatively related to the profitability of standalone companies, they do not affect the profitability of group companies. This suggests that directors in Belgian business groups are not ďtoo busyĒ, and that intra-group interlocks are not facilitators of expropriation by controlling shareholders.

An Rommens; Ludo Cuyvers; Marc Deloof

2007-01-01T23:59:59.000Z

356

Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption  

Science Conference Proceedings (OSTI)

The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the technical feasibility and cost of upgrading low-BTU methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys modular microchannel process technology. The objective of Phase II is to demonstrate the process at the bench scale. The project is on schedule and on budget. A technical and economic feasibility assessment was completed in Task 3. The proposed Velocys technology appears feasible for the methane upgrading market. Evaluated categories include adsorbent selection, rapid-cycle valve selection, microchannel manufacturability assessment, and system design and cost. The selected adsorbent, granular microporous carbon from either Barnaby-Sutcliffe or Calgon, experimentally demonstrated sufficient methane capacity under differential temperature at 100 pounds per square inch gauge. Several valve options were identified, including candidates that can operate millions of cycles between refurbishment. The microchannel adsorber and desorber designs were made using internal Velocys manufacturability standards, and the associated costs are acceptable as included with the complete nitrogen rejection unit (NRU) cost projection. A system design and cost estimate was completed for the NRU section of the methane upgrading system. As integrated into the complete system, the cost is in line with the market requirement. The system has six main unit operations: feed compressor, dehydration unit, nitrogen rejection unit, deoxygenator, carbon dioxide scrubber, and a sales compressor. The NRU is the focus of the development program, and a bench-scale demonstration will be initiated in the next fiscal year. The Velocys NRU system targets producing methane with greater than 96% purity and at least 90% recovery for final commercial operation. A preliminary cost analysis of the methane upgrading system, including the Velocys NRU, suggests that costs below $2.00 per million (MM) BTU methane may be achieved. The cost for a conventional methane upgrading system is well above $2.30 per MM BTU, as benchmarked in an Environmental Protection Agency study.

Anna Lee Tonkovich

2004-07-01T23:59:59.000Z

357

Microsoft Word - CX-BettasRd-ColumbiaThermalUpgradeFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25, 2012 25, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: Bettas Road-Columbia No. 1 230-kV transmission line thermal upgrade Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B4.13, Upgrading and rebuilding existing powerlines Location: Kittitas and Chelan counties, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The project, as proposed, is to upgrade the existing Bettas Road-Columbia No. 1 230-kV transmission line to a maximum operating temperature of 100 ¬įC. Five small segments (equal to approximately 3 miles) along the transmission line will be upgraded in order to meet this overall objective. Construction includes the relocation and

358

UPGRADING METHANE USING ULTRA-FAST THERMAL SWING ADSORPTION  

SciTech Connect

The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the feasibility of upgrading low-Btu methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys' modular microchannel process technology. The project is on schedule and under budget. For Task 1.1, the open literature, patent information, and vendor contacts were surveyed to identify adsorbent candidates for experimental validation and subsequent demonstration in an MPT-based ultra-fast TSA separation for methane upgrading. The leading candidates for preferential adsorption of methane over nitrogen are highly microporous carbons. A Molecular Gate{trademark} zeolite from Engelhard Corporation has emerged as a candidate. For Task 1.2, experimental evaluation of adsorbents was initiated, and data were collected on carbon (MGN-101) from PICA, Inc. This carbon demonstrated a preferential capacity for methane over nitrogen, as well as a reasonable thermal swing differential capacity for a 90% methane and 10% nitrogen mixture. A similar methane swing capacity at 2 psig was measured. The mixture composition is relevant because gob gas contains nearly 85% methane and must be purified to 97% methane for pipeline quality.

Anna Lee Tonkovich

2004-01-01T23:59:59.000Z

359

Recent Upgrade of the Klystron Modulator at SLAC  

SciTech Connect

The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 {mu}S at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 {mu}S at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

Nguyen, M.N.; Burkhart, C.P.; Lam, B.K.; Morris, B.; /SLAC

2011-11-04T23:59:59.000Z

360

Testing of FMI's Coal Upgrading Process  

SciTech Connect

WRI and FMI have collaborated to develop and test a novel coal upgrading technology. Proprietary coal upgrading technology is a fluidized bed-based continuous process which allows high through-puts, reducing the coal processing costs. Processing is carried out under controlled oxidizing conditions at mild enough conditions that compared to other coal upgrading technologies; the produced water is not as difficult to treat. All the energy required for coal drying and upgrading is derived from the coal itself. Under the auspices of the Jointly Sponsored Research Program, Cooperative Agreement DE-FC26-98FT40323, a nominal 400 lbs/hour PDU was constructed and operated. Over the course of this project, several low-rank coals were successfully tested in the PDU. In all cases, a higher Btu, low moisture content, stable product was produced and subsequently analyzed. Stack emissions were monitored and produced water samples were analyzed. Product stability was established by performing moisture readsorption testing. Product pyrophobicity was demonstrated by instrumenting a coal pile.

Vijay Sethi

2009-03-21T23:59:59.000Z

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Innovative Technology Improves Upgrading Process for Unconventional Oil  

NLE Websites -- All DOE Office Websites (Extended Search)

09, 2013 09, 2013 Innovative Technology Improves Upgrading Process for Unconventional Oil Resources Washington, D.C. - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology. Heavy oil is crude oil that is viscous and requires thermally enhanced oil recovery methods, such as steam and hot water injection, to reduce its viscosity and enable it to flow. The largest U.S. deposits of heavy oil are in California and on Alaska's North Slope. Estimates for the U.S. heavy oil resource total about 104 billion barrels of oil in place - nearly five times the United States' proved reserves. In addition, although no commercial-scale development of U.S. oil sands or oil shale has yet occurred, both represent another potential future domestic unconventional oil resource.

362

Darrie Ganzhorn: Director of Programs and Operations, Homeless Garden Project  

E-Print Network (OSTI)

do something that wasnít esoteric, that was more basic anddo something that wasnít esoteric, that was more basic and

Reti, Irene H.

2010-01-01T23:59:59.000Z

363

Photon Sciences Directorate | 2010 Annual Report | Project Beamlines  

NLE Websites -- All DOE Office Websites (Extended Search)

mature to begin long-lead-time procurements of major beamline systems, such as radiation enclosures and optical systems. Motion controllers are being tested and...

364

Certified_Federal_Project_Directors_4_30_2013.xls  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM ABDUL,WAHED NMN Level III EM ADAMS,ANGELIA D Level I EM ADAMS,KAREN M Level I EM ADAMS,VINCENT NMN Level III EM ALMAHIE YOUSIF,ELAMIN M Level I FE ALSUP,CHARLES T Level I SC...

365

Darrie Ganzhorn: Director of Programs and Operations, Homeless Garden Project  

E-Print Network (OSTI)

a three-year job training program; this isnít: you stay herehow much of it was a training program. So when Cal-Worksídialogue between the training program and the sustainable

Reti, Irene H.

2010-01-01T23:59:59.000Z

366

Darrie Ganzhorn: Director of Programs and Operations, Homeless Garden Project  

E-Print Network (OSTI)

business, and he was an apprentice up at UCSCís Farm andand they both were apprentices at UCSC, so the trainees get

Reti, Irene H.

2010-01-01T23:59:59.000Z

367

SLAC National Accelerator Laboratory - LCLS-II Project Director...  

NLE Websites -- All DOE Office Websites (Extended Search)

winner of the Robert R. Wilson Prize for Achievement in the Physics of Particle Accelerators, awarded by the American Physical Society. The prize, which honors and encourages...

368

Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

369

02 INFORMATION ABOUT PRINCIPAL INVESTIGATORS/PROJECT DIRECTORS(PI/PD) and co-PRINCIPAL INVESTIGATORS/co-PROJECT DIRECTORS  

E-Print Network (OSTI)

of prehistoric Native American societies in the Southeastern U.S., but this lone study represents, to this day. Paleoclimate and the potential food reserves of Mississippian societies: A case study from the Savannah River

Zanibbi, Richard

370

02 INFORMATION ABOUT PRINCIPAL INVESTIGATORS/PROJECT DIRECTORS(PI/PD) and co-PRINCIPAL INVESTIGATORS/co-PROJECT DIRECTORS  

E-Print Network (OSTI)

, civic, and academic communities. The Foundation's activities and assets are governed by a board for 35 years, and has the highest rate of usage by campus constituencies of any of the UC campuses University Gallery of Art; the Palazzo delle Esposizioni in Rome, Italy; and the Archivo Francesco Conz

Murayama, Hitoshi

371

02 INFORMATION ABOUT PRINCIPAL INVESTIGATORS/PROJECT DIRECTORS(PI/PD) and co-PRINCIPAL INVESTIGATORS/co-PROJECT DIRECTORS  

E-Print Network (OSTI)

/Microclimate Whole-System Analysis Productivity/Biomass System Energetics Landscape Dynamics Chemical & Biochemical ecosystem dynamics and climate feedbacks (forest-atmosphere exchanges of trace gases, water, and energy

Ruess, Roger W.

372

INFORMATION ABOUT PRINCIPAL INVESTIGATORS/PROJECT DIRECTORS(PI/PD) and co-PRINCIPAL INVESTIGATORS/co-PROJECT DIRECTORS  

E-Print Network (OSTI)

as confidential information at the time of disclosure ("Confidential Information"). Confidential Information does, AS TO ANY MATTER WHATSOEVER, INCLUDING, WITHOUT LIMITATION, THE CONDITION OF THE RESEARCH OR ANY INVENTION(S; OR THE OWNERSHIP, MERCHANTABILITY, OR FITNESS FOR A PARTICULAR PURPOSE OF THE RESEARCH OR ANY SUCH INVENTION

Murayama, Hitoshi

373

EM Announces New Director of Office of External Affairs | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Announces New Director of Office of External Affairs EM Announces New Director of Office of External Affairs May 7, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM has announced...

374

Argonne director Isaacs to receive Chicago Council on Science...  

NLE Websites -- All DOE Office Websites (Extended Search)

Argonne director Isaacs to receive Chicago Council on Science and Technology award June 13, 2013 Tweet EmailPrint ARGONNE, Ill. - Eric D. Isaacs, director of the U.S. Department of...

375

Parney Albright steps down as Laboratory director, Bret Knapp...  

NLE Websites -- All DOE Office Websites (Extended Search)

steps down as Laboratory director, Bret Knapp appointed acting director James A Bono, LLNL, (925) 422-9919, bono4@llnl.gov High Resolution Image Parney Albright High Resolution...

376

Secretary Bodman and Rosatom Director Kiriyenko Meet to Discuss...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Rosatom Director Kiriyenko Meet to Discuss U.S.-Russia Nuclear Security Progress Secretary Bodman and Rosatom Director Kiriyenko Meet to Discuss U.S.-Russia Nuclear Security...

377

Nan Sauer named Associate Director for Chemistry, Life, and Earth Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

Sauer named AD for Chemistry, Life, and Earth Sciences Sauer named AD for Chemistry, Life, and Earth Sciences Nan Sauer named Associate Director for Chemistry, Life, and Earth Sciences Sauer has a distinguished track record as a research scientist with more than 60 publications and technical reports in archival journals. August 9, 2011 Nan Sauer Nan Sauer Contact Communicatons Office (505) 667-7000 LOS ALAMOS, New Mexico, August 9, 2011- Nancy ("Nan") Sauer is the new associate director for Chemistry, Life, and Earth Sciences (ADCLES) at Los Alamos National Laboratory (LANL). In her 25-year career at LANL, Sauer has held several positions of increasing responsibility. After working as a director's postdoctoral fellow, she advanced to a principal investigator and team leader in the Chemistry Division to leader of several projects. Most recently she has

378

Energy Upgrade California | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Upgrade California Upgrade California Energy Upgrade California < Back Eligibility Multi-Family Residential Residential Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Other Sealing Your Home Ventilation Manufacturing Heating Windows, Doors, & Skylights Program Info Funding Source The American Reinvestment and Recovery Act of 2009, ratepayer funds State California Program Type State Rebate Program Rebate Amount Basic Upgrade Package: 1,000 Advance Upgrade Package: 1,500 - 4,000 The Energy Upgrade California program serves as a one-stop shop for California homeowners who want to improve the energy efficiency of their homes. The program connects homeowners with qualified contractors, and helps homeowners find all the available incentives from their local

379

NIST Speeches by Richard Kayser, Director, Office of Safety ...  

Science Conference Proceedings (OSTI)

NIST Speeches by Richard Kayser, Director, Office of Safety, Health and Environment. NIST Speeches by Richard Kayser ...

2012-05-10T23:59:59.000Z

380

NIST Director Gallagher to Co-Chair White House Standards ...  

Science Conference Proceedings (OSTI)

NIST Director Gallagher to Co-Chair White House Standards Committee. For Immediate Release: March 30, 2010. ...

2010-10-05T23:59:59.000Z

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Main Generator Excitation System Upgrade/Retrofit  

Science Conference Proceedings (OSTI)

Upgrading or replacing even a portion of the excitation system of a generator can provide increased reliability and availability while simultaneously decreasing operational and maintenance costs. However, the upgrade or retrofit of an excitation system is a major cost involving some degree of implementation, installation, or performance risk. This report provides lessons learned, experiences, practices and solutions from plants that have installed excitation system retrofits and upgrades. This informatio...

2005-11-07T23:59:59.000Z

382

Human Resource Directors (HRD) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Resource Resource Directors (HRD) Human Resource Directors (HRD) Name Organization Phone Number E-Mail Brian Carter Bonneville Power Administration (BPA) (503) 230-4527 becarter@bpa.gov Linda Brunner (Acting) Consolidated Business Center (EM) (513) 246-0518 linda.brunner@emcbc.doe.gov Connie Nottingham (Acting) Richland Operations Office (EM) (509) 373-6288 connie.nottingham@rl.doe.gov Helene Taylor Savannah River Operations (EM) (803) 952-8123 helene.taylor@srs.gov Bruce Wynn National Energy Technology Laboratory (NETL/FE) (412) 386-5259 bruce.wynn@netl.doe.gov Shandon Davis Strategic Petroleum Reserve Proj. Office (SPRO/FE) (504) 734-4382 shandon.davis@spr.doe.gov Edith Ramos Office of Inspector General (OIG) (202) 586-2470 edith.ramos@hq.doe.gov

383

TO : John T. Sherman, Assistant Director for  

Office of Legacy Management (LM)

John T. Sherman, Assistant Director for John T. Sherman, Assistant Director for DATE: February 26, 1957 Domestic Procurement FROM : E.G. Vanhlarcom 'I ~~,&k,(+~~~ - i,;;, : : . .,,)_! ,A:!' SUBJ=T: SOLVENT XTHACTION OF PHOSPXMIC ACT 'On the occasion of my visit to the Dow Chemical Laboratory February 13th, I took the opportunity to discuss with them their original work on the use of solvent extraction for recovering- uranium from phosphoric acid. I told them that it was my under- standing that the operating companies in Florida were experiencing serl.cus loss of solvent and consequent high cost of this product. Er. Bailes and Ray Long explained to me that they had done the original work which was all reported in Dow--8. They said that they had worked cooperatively with both the Florida companies and with

384

FROM THE MESSAGE DIRECTOR Alex Fischer I  

NLE Websites -- All DOE Office Websites (Extended Search)

FROM THE FROM THE MESSAGE DIRECTOR Alex Fischer I can't reflect on progress in 2005 and the opportuni- ties ahead of us in 2006 without great optimism and excitement. It was certainly a busy and exciting year in the Office of Technology Transfer and Economic Development. Our staff and partners continue to aggressively pursue new opportunities to use ORNL's technologies for economic opportunity for our community, region, and country. Under the leadership of Casey Porto, re- cruited for the post of director of technol- ogy transfer from Case Western University, ORNL logged a record year in a variety of areas, including royalty income, patent reimbursements, and invention disclosures. This report details many of the exciting licensing deals that form the core mission

385

The Upgraded D0 detector  

Science Conference Proceedings (OSTI)

The D0 experiment enjoyed a very successful data-collection run at the Fermilab Tevatron collider between 1992 and 1996. Since then, the detector has been upgraded to take advantage of improvements to the Tevatron and to enhance its physics capabilities. We describe the new elements of the detector, including the silicon microstrip tracker, central fiber tracker, solenoidal magnet, preshower detectors, forward muon detector, and forward proton detector. The uranium/liquid-argon calorimeters and central muon detector, remaining from Run I, are discussed briefly. We also present the associated electronics, triggering, and data acquisition systems, along with the design and implementation of software specific to D0.

Abazov, V.M.; Abbott, B.; Abolins, M.; Acharya, B.S.; Adams, D.L.; Adams, M.; Adams, T.; Agelou, M.; Agram, J.-L.; Ahmed, S.N.; Ahn, S.H.; Ahsan, M.; Alexeev, G.D.; Alkhazov, G.; Alton, A.; Alverson, G.; Alves, G.A.; Anastasoaie, M.; Andeen, T.; Anderson, J.T.; Anderson, S.; /Buenos Aires U. /Rio de Janeiro, CBPF /Sao Paulo, IFT /Alberta U. /Simon Fraser U. /York U., Canada /McGill U. /Beijing, Inst. High Energy Phys. /Hefei, CUST /Andes U., Bogota /Charles U. /Prague, Tech. U. /Prague, Inst. Phys. /San Francisco de Quito U. /Clermont-Ferrand U. /LPSC, Grenoble /Marseille, CPPM /Orsay, LAL /Paris U., VI-VII /DAPNIA, Saclay /Strasbourg, IReS

2005-07-01T23:59:59.000Z

386

ARPA-E Announces Projects Have Attracted Over $450 Million in...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy's Advanced Research Projects Agency - Energy (ARPA-E), Deputy Director Cheryl Martin announced that ARPA-E projects have demonstrated major technical successes and shown...

387

Upgrade Boilers with Energy-Efficient Burners  

SciTech Connect

This revised ITP steam tip sheet on upgrading boilers provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

2006-01-01T23:59:59.000Z

388

Better Buildings Neighborhood Program: Energy Efficiency Upgrades...  

NLE Websites -- All DOE Office Websites (Extended Search)

PYC made the recommended energy efficiency upgrades, which included new insulation and air sealing, a new hot water heater, programmable thermostats, improved lighting, and new...

389

ENERGY STAR Building Upgrade Manual | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

ENERGY STAR Building Upgrade Manual Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new...

390

Photon Sciences Directorate | 2010 Annual Report | DISCOVERY at Light Speed  

NLE Websites -- All DOE Office Websites (Extended Search)

Accelerator Division Delivers Reliable NSLS Beams, Key NSLS-II Components Accelerator Division Delivers Reliable NSLS Beams, Key NSLS-II Components Ferdinand Willeke "We had 14 goals for the year and checked off 11, with 'in progress' noted on the balance. This achievement is a testament to the talent and hard work of the Accelerator Division staff, our vendors, and our supporters at Brookhaven and elsewhere." - Ferdinand Willeke Director, Accelerator Division Photon Sciences' Accelerator Division had a full workload in 2010. While it was generally business as usual at NSLS, maintaining an older synchrotron at a high performance level is not easy. The NSLS-II Project placed increasing demands on the division, with 2010 seeing great growth in construction and design, and preparations ongoing for the eventual transition from NSLS to the new facility.

391

The Computation Directorate at Lawrence Livermore National Laboratory  

Science Conference Proceedings (OSTI)

The Computation Directorate at Lawrence Livermore National Laboratory has four major areas of work: (1) Programmatic Support -- Programs are areas which receive funding to develop solutions to problems or advance basic science in their areas (Stockpile Stewardship, Homeland Security, the Human Genome project). Computer scientists are 'matrixed' to these programs to provide computer science support. (2) Livermore Computer Center (LCC) -- Development, support and advanced planning for the large, massively parallel computers, networks and storage facilities used throughout the laboratory. (3) Research -- Computer scientists research advanced solutions for programmatic work and for external contracts and research new HPC hardware solutions. (4) Infrastructure -- Support for thousands of desktop computers and numerous LANs, labwide unclassified networks, computer security, computer-use policy.

Cook, L

2006-09-07T23:59:59.000Z

392

Analysis Efforts Supporting NSTX Upgrades  

SciTech Connect

The National Spherical Torus Experiment (NSTX) is a low aspect ratio, spherical torus (ST) configuration device which is located at Princeton Plasma Physics Laboratory (PPPL) This device is presently being updated to enhance its physics by doubling the TF field to 1 Tesla and increasing the plasma current to 2 Mega-amperes. The upgrades include a replacement of the centerstack and addition of a second neutral beam. The upgrade analyses have two missions. The first is to support design of new components, principally the centerstack, the second is to qualify existing NSTX components for higher loads, which will increase by a factor of four. Cost efficiency was a design goal for new equipment qualification, and reanalysis of the existing components. Showing that older components can sustain the increased loads has been a challenging effort in which designs had to be developed that would limit loading on weaker components, and would minimize the extent of modifications needed. Two areas representing this effort have been chosen to describe in more details: analysis of the current distribution in the new TF inner legs, and, second, analysis of the out-of-plane support of the existing TF outer legs.

H.Zhang, P. Titus, P. Rogoff, A.Zolfaghari, D. Mangra, M. Smith

2010-11-29T23:59:59.000Z

393

Microsoft Word - CX-2013ElectronicEquipmentUpgrades_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 12, 2013 April 12, 2013 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Cleareance Memorandum Molly Kovaka Bob Trismen Contractor - TEP-CSB-2 Electrical Engineer - TEP-CSB-1 Proposed Action: Electronic Equipment Upgrades and Emergency Generator Replacements PP&A Project No: 2571 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment; B1.3 Routine maintenance activities Location: Multiple locations within Bonneville Power Administration's (BPA) service area. Proposed by: BPA Description of the Proposed Action: BPA proposes to upgrade electronic equipment required for operation of its transmission grid and replace emergency generators. Several types of actions involving communications, meters, relays, and Remedial Action Scheme (RAS) and Supervisory

394

Microsoft Word - CX_TunkRadioStationUpgrade_2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 30, 2012 May 30, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Tunk Mountain Radio Station Upgrade Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19- Siting/construction/operation of microwave/radio communication towers Location: Synarep, Okanogan County, WA Township 35N, Range 29E, and Section 8 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA plans to upgrade its Tunk Mountain Radio Station in the Tonasket Ranger District of the Okanogan-Wenatchee National Forest. BPA is coordinating with the U.S. Forest Service (USFS) to ensure the existing land use permit is

395

Microsoft Word - AlbionButteRSCommunicationUpgrade-CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2011 4, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Albion Butte Radio Station Communication Upgrade Budget Information: Work Order # 00253466 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Location: Cassia County, Idaho - Section 19, Township 11 South, Range 26 East of the Nibbs Creek Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade the communication building and equipment at BPA's Albion Butte Radio Station located in Cassia County, ID. This project is part of an

396

Microsoft Word - Holcomb and Naselle Communication Upgrade CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2011 6, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Holcomb Radio Station and Naselle Substation Communication Upgrade Project Budget Information: Work Order # 00253203 and # 00253206 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Locations: Holcomb Radio Station: Pacific County, Washington - Township 13 North, Range 7 West, Section 30 of the Lebam Quadrangle Naselle Substation: Pacific County, Washington - Township 10 North, Range 9 West, Section 4 of the Oman Ranch Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to upgrade the communication equipment at

397

Microsoft Word - CX-DixieSubstationUpgradesFY11_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of secondary containment facilities at Dixie Substation Budget Information: Work Order: 00004952 Categorical Exclusion Applied (Appendix B to Subpart D, 10 C.F.R. Part 1021): B4.6: Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms. Location: PLS T1S R8E S1 Dixie Substation in Elmore County, Idaho.

398

Solar Classroom Update: Making Clean Energy Upgrades a Back-to-School  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Classroom Update: Making Clean Energy Upgrades a Classroom Update: Making Clean Energy Upgrades a Back-to-School Priority Solar Classroom Update: Making Clean Energy Upgrades a Back-to-School Priority August 21, 2013 - 2:52pm Addthis Watch as Aaron Sebens, a fourth-grade teacher in Durham, North Carolina, gives an update on his student's solar-powered classroom project. Erin R. Pierce Erin R. Pierce Digital Communications Specialist, Office of Public Affairs Clean Energy Resources Watch our first video on the solar-powered classroom. Check out Lawrence Berkeley National Laboratory's guide on planning and financing energy upgrades for schools. Visit Energy Saver for more resources on saving energy and money. This week, Energy.gov is heading back to school. We'll be featuring stories on the role students and schools play in driving America's energy

399

Research Laboratory Experiments with Energy Efficiency Upgrades |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades August 30, 2012 - 11:52am Addthis Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Julie McAlpin Communications Liaison, State Energy Program

400

Future Upgrades | Brookhaven and the LHC  

NLE Websites -- All DOE Office Websites (Extended Search)

Future Upgrades Future Upgrades Magnetic field inside a Nb3Sn quadropole magnet Magnetic field inside a Nb3Sn quadropole magnet. Brookhaven leads various technical coordination efforts for the upgrade of the ATLAS detector, including constructing the new silicon tracker, liquid argon electronics, and the new muon chambers. Brookhaven also contributes to the commissioning and future upgrade of the LHC itself in two areas: accelerator physics and superconducting magnets. This work is carried out as part of the U.S. LHC Accelerator Research Program (LARP) in collaboration with Fermilab, Lawrence Berkeley National Lab, and the Stanford Linear Accelerator Center. The ultimate goal of the upgrade program is to increase the rate and efficiency of particle collisions, a measure known as luminosity.

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

MMCR Upgrades: Present Status and Future Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

MMCR Upgrades: Present Status and Future Plans MMCR Upgrades: Present Status and Future Plans K. B. Widener and A. S. Koontz Pacific Northwest National Laboratory Richland, Washington K. P. Moran and K. A. Clark National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado C. Chander STC xxxxxxxxx M. A. Miller and K. L. Johnson Brookhaven National Laboratory Upton, New York Abstract In September 2003, the Southern Great Plains (SGP) millimeter wave cloud radar (MMCR) was upgraded to a new digital signal processor that significantly increases the temporal resolution and the processing capability of the MMCR. The Barrow MMCR upgrade will be completed in early 2004. We will discuss the hardware and software C40 upgrade to the MMCRs at SGP and Barrow and the plans

402

Research Laboratory Experiments with Energy Efficiency Upgrades |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades August 30, 2012 - 11:52am Addthis Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Julie McAlpin Communications Liaison, State Energy Program

403

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 DATE: April 24, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Guide Chapter 4.6 - Assigning Identifying Numbers Outside of the Strategic Integrated Procurement Enterprise System (STRIPES) SUMMARY: The subject guide chapter provides guidance on the DOE's procedures for assigning identifying numbers to all new requisitions, solicitations and business instruments processed outside of STRIPES. This Guide Chapter does not apply to instrument numbers issued and business instruments awarded prior to the deployment of STRIPES at the DOE. The guidance in this Flash will be available online at the following website:

404

To: Procurement Directors From: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-26 2-26 Date: March 2, 2012 To: Procurement Directors From: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management Subject: Release of Department of Energy Award Fee and Incentive Fee Reports Summary: To provide a consistent Department of Energy approach on the disclosure of award fee and incentive fee reports (fee determination reports) for management and operating contracts and other major contracts at the Department's sites, the Department will, in the near future, be implementing the following policy: programs shall, at a minimum, publish a one-page score card for each contractor summarizing the fee

405

TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

44 44 DATE: May 14 , 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Procurement and Assistance Management SUBJECT: Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 SUMMARY: For Congressional notifications, there are changes to the processes and thresholds. For both contracts and financial assistance actions, Congressional notifications, in addition to the Section 311 notices and Section 301(b) reporting, are required for the following types of actions at certain dollar thresholds- * For advance notification of award actions; * Before issuing a final request for proposal or funding opportunity announcement; or

406

TO: Procurement Directors FROM: Director Contracts and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 DATE: May 07, 2012 TO: Procurement Directors FROM: Director Contracts and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: Department of Energy (DOE) Audit Guidance for For-Profit Recipients SUMMARY: The attached guidance documents provide the requirements and guidance for independent audit organizations in conducting compliance audits of for-profit recipients of federal financial assistance from DOE for FY 2011 and thereafter. Note that the guidance no longer includes the requirement for 10 CFR 600.316 audits of subrecipients. DOE issued a Federal Register Notice December 15, 2011, seeking information and comments related to the requirements and guidance for independent audit

407

Joint Staff, and J-Directorate DirectivesĒ  

E-Print Network (OSTI)

1. Purpose a. To provide the process and procedures for handling the transition and reconciliation of USJFCOM issuances into CJCS/Joint Staff directives in accordance with (IAW) references a and b. b. For the purpose of this notice, the word ďissuances Ē refers to USJFCOM policy documents, and the word ďdirectives Ē refers to Joint Staff policy documents. 2. Cancellation. None. 3. Applicability. This notice applies to all Joint Staff personnel and to all U.S. Joint Forces Command (USJFCOM) directorates, organizations, or other subordinate activities transitioning to the Joint Staff. It does not apply to USJFCOM entities transitioning to organizations outside the Joint Staff.

Dom/sjs Cjcs Notice

2011-01-01T23:59:59.000Z

408

Bruce A. Peterson Director of General  

E-Print Network (OSTI)

#12;Need Project Funding? You already know that energy costs are up and budgets are tight. But do you of the lighting project cost not covered by the loan. The projects have all been installed and are saving Project Cost: 5.9 years California Energy Commission 1516 9th Street Sacramento, CA 95814-5512 Jackalyne

409

Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades  

NLE Websites -- All DOE Office Websites (Extended Search)

About About Printable Version Share this resource Send a link to Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades to someone by E-mail Share Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Facebook Tweet about Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Twitter Bookmark Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Google Bookmark Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Delicious Rank Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Digg Find More places to share Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on AddThis.com... Our History Related Federal Programs Why Energy Efficiency Upgrades

410

EA-1321: Proposed Upgrade and Improvement of The National Synchrotron...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Upgrade and Improvement of The National Synchrotron Light Source Complex at Brookhaven National Laboratory, Upton, New York EA-1321: Proposed Upgrade and Improvement of...

411

Using QECBs for Public Building Upgrades: Reducing Energy Bills...  

NLE Websites -- All DOE Office Websites (Extended Search)

Public Building Upgrades: Reducing Energy Bills in the City of Philadelphia Title Using QECBs for Public Building Upgrades: Reducing Energy Bills in the City of Philadelphia...

412

ENERGY STAR Building Upgrade Manual Chapter 13: Retail Stores...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 13: Retail Stores The Building Upgrade Manual is a...

413

ENERGY STAR Building Upgrade Manual Chapter 7: Supplemental Load...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 7: Supplemental Load Reduction The Building Upgrade...

414

ENERGY STAR Building Upgrade Manual Chapter 6: Lighting | ENERGY...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 6: Lighting The Building Upgrade Manual is a...

415

ENERGY STAR Building Upgrade Manual Chapter 5: Retrocommissioning...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 5: Retrocommissioning The Building Upgrade Manual is...

416

ENERGY STAR Building Upgrade Manual Chapter 12: Hotels and Motels...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 12: Hotels and Motels The Building Upgrade Manual is...

417

ENERGY STAR Building Upgrade Manual Chapter 10: K-12 Schools...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 10: K-12 Schools The Building Upgrade Manual is a...

418

ENERGY STAR Building Upgrade Manual Chapter 4: Financing | ENERGY...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 4: Financing The Building Upgrade Manual is a...

419

Boiler Upgrades and Decentralizing Steam Systems Save Water and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Boiler Upgrades and Decentralizing Steam Systems Save Water and Energy at Naval Air Station Oceana Boiler Upgrades and Decentralizing Steam Systems Save Water and Energy at Naval...

420

SC Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Projects Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated November 2013) Project Construction Photos Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov SC Projects Print Text Size: A A A RSS Feeds FeedbackShare Page SC Projects-Contains information regarding SC projects including project review dates, information on Office of Science Certified Federal Project Directors and Defining the Leadership Traits/Skill Set for a Successful Federal Project Director, and project photos or links to project photo sites. Last modified: 3/18/2013 10:54:36

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Scientific Upgrades at the Oak Ridge National Laboratory High Flux Isotope Reactor  

Science Conference Proceedings (OSTI)

The United States Department of Energy is sponsoring a number of projects that will provide scientific upgrades to the neutron science facilities associated with the High Flux Isotope Reactor (HFIR) located at Oak Ridge National Laboratory. Funding for the first upgrade project was initiated in 1996 and all presently identified upgrade projects are expected to be completed by the end of 2003. The upgrade projects include: (1) larger beam tubes, (2) a new monochromator drum for the HB-1 beam line, (3) a new HB-2 beam line system that includes one thermal guide and a new monochromator drum, (4) new instruments for the HB-2 beamline, (5) a new monochromator drum for the HB-3 beam line, (6) a supercritical hydrogen cold source system to be retrofitted into the HB-4 beam tube, (7) a 3.5 kW refrigeration system at 20 K to support the cold source and a new building to house it, (8) a new HB-4 beam line system composed of four cold neutron guides with various mirror coatings and associated shielding, (9) a number of new instruments for the cold beams including two new SANS instruments, and (10) construction of support buildings. This paper provides a short summary of these projects including their present status and schedule.

Selby, Douglas L [ORNL; Jones, Amy [ORNL; Crow, Lowell [ORNL

2012-01-01T23:59:59.000Z

422

Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydropower Upgrades to Yield Added Generation at Average Costs Less Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4 cents per kWh - Without New Dams Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4 cents per kWh - Without New Dams November 4, 2009 - 12:00am Addthis WASHINGTON, DC - U.S. Energy Secretary Steven Chu today announced up to $30.6 million in Recovery Act funding for the selection of seven hydropower projects that modernize hydropower infrastructure by increasing efficiency and reducing environmental impacts at existing facilities. The expanded hydro generation projects have estimated incremental costs of less than 4 cents per kWh on average. The selections announced today will deploy innovative technologies such as high-efficiency, fish-friendly turbines, improved water intakes, and

423

Microsoft Word - CX-Big Eddy-TroutdaleUpgradeFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Erich Orth Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Big Eddy - Troutdale No. 1 230 kV Transmission Line Upgrade Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B4.13, Upgrading and Rebuilding Existing Powerlines. Location: Wasco, Hood River and Clackamas counties, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The project, as proposed, is the thermal upgrade of the BPA Big Eddy - Troutdale No.1 230 kV Transmission Line: Background BPA's Big Eddy - Troutdale No. 1 230-kV transmission line is one of three major transmission lines that cross the Oregon Cascade Mountains. These lines transport The Dalles hydro generation and northwest wind generation output in the east to load centers west of the Cascades, like

424

Staff Analysis of Proposed Modifications to Upgrade Three Combustion  

E-Print Network (OSTI)

Procter and Gamble Cogeneration Project. Staff prepared an analysis of this proposed change, and a copy is enclosed for your information and review. The Procter and Gamble project is a 164 MW cogeneration power plant located in the City of Sacramento in Sacramento County. The project was certified by the Energy Commission on November 16, 1994, and began commercial operation in 1996. The proposed modifications will allow SCA to upgrade the two LM6000PA combustion turbines to LM6000PCs. Additionally, Spray Intercooled Turbine and Enhanced Flow and Speed (Sprint/EFS) technology will be added to all three turbines. These upgrades are anticipated to lower the combustion turbines í air pollutant emissions and raise thermal efficiency. Overall facility output is expected to increase by 22 MW (nominal). Energy Commission staff reviewed the petition and assessed the impacts of this proposal on environmental quality, public health and safety, and proposes revisions to seven conditions of certification: AQ-10 through AQ-14, AQ-16, and AQ-39. In addition, AQ-15 would be deleted, and AQ-50 through AQ-51 added to the current conditions of certification. Three analyses were prepared by technical staff, and are attached to this

Paula David

2008-01-01T23:59:59.000Z

425

Energy Efficiency Upgrades for Little Rock Air Force Base  

DOE Green Energy (OSTI)

Little Rock Air Force Base (LRAFB), in partnership with the local utility, Entergy Services, Inc., has reduced energy costs and used savings from investments in high-efficiency equipment to maintain and improve the condition of base housing and other facilities. Three projects were completed, with over $10 million invested. Major accomplishments include replacing air-to-air heat pumps with high-efficiency ground-source heat pumps (GSHPs) in more than 1,500 base housing units, lighting modifications to 10 buildings, upgrade of HVAC equipment in the base's enlisted club, and energy-efficient lighting retrofits for LRAFB's flight simulator.

Goldman, C.; Dunlap, M.A.

2000-11-13T23:59:59.000Z

426

Energy Star Building Upgrade Manual Retrocommissioning Chapter 5  

NLE Websites -- All DOE Office Websites (Extended Search)

5. Retrocommissioning 5. Retrocommissioning Revised October 2007 5. Overview 2 Energy and Non-energy Benefits 3 5.2 Project Planning 5 Selecting a Project 5 Benchmarking 5 Selecting a Provider and Team 6 Developing a Scope of Work 7 5.3 Project Execution 7 Implementing the Recommendations 8 Maintaining the Benefits 9 Planning for Recommissioning 10 5.4 Tune-up Opportunities  Lighting 11 Supplemental Loads 12 Distribution Systems 13 Heating and Cooling Systems 14 5.5 Summary 6 Bibliography 7 Glossary G- ENERGY STAR ¬ģ Building Manual 2 5. Retrocommissioning 5. Overview Retrocommissioning is the first stage in the building upgrade process. The staged approach accounts for the interactions among all the energy flows in a building (Figure 5.1) and pro-

427

Microsoft Word - CX-Olympia-SouthElma_upgrades_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2011 0, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: The project consists of upgrades to the Olympia-South Elma No. 1, 115-kV transmission line from structure 21/10 to Elma Substation. Budget Information: Work Order #251089 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not effect the environment beyond the previously developed facility area including but not limited to....tower modifications, changing insulators, and replacement of poles ...conductors...and crossarms. Location: The project is located in Grays Harbor County, Washington along Bonneville Power

428

Professor and Director of the Fusion Science Center of Extreme...  

NLE Websites -- All DOE Office Websites (Extended Search)

Professor and Director of the Fusion Science Center of Extreme States of Matter and Fast Ignition, University of Rochester | National Nuclear Security Administration Our Mission...

429

Schneider Electric Director Initiates Strategy to Recruit IAC...  

NLE Websites -- All DOE Office Websites (Extended Search)

Schneider Electric Director Initiates Strategy to Recruit IAC Graduates Carl Castellow realized that his industrial consulting team at Schneider Electric could benefit from adding...

430

TMS Executive Director Appointed to University of California ...  

Science Conference Proceedings (OSTI)

Sep 6, 2011 ... DISLOCATION: THE YOUNG LEADERS NEWSLETTER. 09/6 - TMS Executive Director Appointed to University of California Academic Advisory†...

431

NETL: News Release - Anthony Cugini Named Director of DOE's National...  

NLE Websites -- All DOE Office Websites (Extended Search)

News Release Release Date: April 1, 2010 Anthony Cugini Named Director of DOE's National Energy Technology Laboratory Extensive Background Includes Leading Lab's Office of...

432

Renzo Tomellini, EC Directorate General for Research and innovation...  

NLE Websites -- All DOE Office Websites (Extended Search)

on Critical Materials, ChairsAnimateurs: Jeff Skeer, DOE Office of Policy and International Affairs and Renzo Tomellini, EC Directorate General for Research and Innovation...

433

Director's Perspective by George Miller | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Perspective by George Miller Director's Perspective by George Miller Miller-LLNL-SEAB.10.11.pdf More Documents & Publications Computational Advances in Applied Energy...

434

DOE Names New Director of Idaho Operations Office  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Names New Director of Idaho Operations Office Idaho Falls, ID - The Department of Energy today announced that Rick Provencher has been named manager of its Rick Provencher...

435

Summary of Testimony of Larry Dickerman, Director or Distribution...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Testimony of Larry Dickerman, Director or Distribution Engineering Services, American Electric Power before the House Energy and Commerce Committee March 20th 2007 Summary of...

436

DOE Congratulates Under Secretary, National Lab Director and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Congratulates Under Secretary, National Lab Director and Other National Lab Scientists for Receiving Top Scientific Honor DOE Congratulates Under Secretary, National Lab...

437

Elizabeth Sellers appointed deputy director of LANL; Bechtel...  

NLE Websites -- All DOE Office Websites (Extended Search)

Kansas City Site Office from 1999 to 2003, responsible for oversight of the Kansas City Plant. Previously Sellers was director of DOE's spent nuclear fuel environmental...

438

A survey of dermatology residency program directors' views on mentorship  

E-Print Network (OSTI)

directors of residency training programs have an importantgiven residency training program. This study was undertakenacademic residency training programs in the United States.

Donovan, Jeff

2009-01-01T23:59:59.000Z

439

Josť Montenegro: Farm Operations Director, Rural Development Center  

E-Print Network (OSTI)

Director, Organic Farming Training Program Rural Developmentorganic farming training program at the Rural Developmentpercent of the six-month training program. But also they had

Farmer, Ellen

2010-01-01T23:59:59.000Z

440

Brookhaven National Laboratory Industrial Hygiene Group Environment, Safety, Health Directorate  

E-Print Network (OSTI)

Safety & Health Services Division Industrial Hygiene Laboratory R. Wilson (0.8) __________________ 06Brookhaven National Laboratory Industrial Hygiene Group Environment, Safety, Health Directorate

Homes, Christopher C.

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Brookhaven National Laboratory Industrial Hygiene Group Environment, Safety, Health Directorate  

E-Print Network (OSTI)

Safety & Health Services Division Industrial Hygiene Laboratory/ HEPA Filter Surveillance TestingBrookhaven National Laboratory Industrial Hygiene Group Environment, Safety, Health Directorate

Homes, Christopher C.

442

Oak Ridge National Laboratory - Audit and Oversight Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

is provided below. Contacts C. Gail Lewis, CIA, CISA, CFE, CPA (inactive) - IAD Director Sandy Glazier - Executive Secretary Divisions Internal Audit Services Organization Chart...

443

Project Management | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Management Project Management Project Directors are responsible for the planning, programming, budgeting and acquisition of capital assets. One of the principal outcomes in exercising this responsibility is the delivery of projects on schedule, within budget, with the required performance capability, and compliant with quality, environmental, safety and health standards. These web pages identify the DOE requirements related to the acquisition of capital assets and present a common framework for implementing the requirements. Our intent is not to impose additional requirements, but rather place existing requirements in the proper context. The target audience for these pages includes Federal Project Directors, Program Managers, Acquisition Executives, and others involved in the DOE capital asset acquisition

444

Program & Project Management For The Acquisition Of Capital Assets  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 3, 2011 February 3, 2011 Operational Organization Chart (FY 11) Office of Engineering & Construction Management POLICY - GUIDANCE -OVERSIGHT Pete Check Deputy Director Les Novitsky - Management Analyst (on detail) Rosalyn Matthews - Program Support Specialist EIR Program Analyst (IBM) - Monica Morris Robert Raines Director for Project Management Systems & Assessments Peter O'Konski Director for Facilities Management & Professional Development Paul Bosco Director Real Estate Tom Geronikos - Realty Spec Mark Price - Realty Spec David Steinau - Realty Spec Project Management James Fountain - Prog Analyst John Makepeace - Prog Analyst Cynthia Seiter - Prog Analyst Project Mgt Assessment Mike Peek - Gen Engr Tom Bruder- Gen Engr Brian Huizenga - Gen Engr Rick Elliott -- Gen Engr

445

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

MP.Y 2 9 1987 MP.Y 2 9 1987 -f/j ' I ,DL -3 d Mr. Carl Schafer Director of Environmental Policy Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C. 20301 Dear Mr. Schafer: As you know, the Department of Energy (DOE) is implementing a program to identify sites that may be radiologically contaminated as a result of DOE predecessor operations and to correct any problems associated with this contamination if there is DOE authority to do so. Reviews of historical materials from the Manhattan Engineer District (MED) and Atomic Energy Commission (AEC) era conducted in support of this program have identified a number of active and former Department of Defense (DOD) installations and DOD contractor sites involved in activities related to the MED/AEC

446

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

Mr. Carl Schafer Mr. Carl Schafer Director of Environmental Policy 1_ Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C. 20301 Dear Mr. Schafer: As YOU know, the Department of Energy (DOE) is implementing, a program to identify sites that may be radiologically contaminated as a result of ,DOE predecessor operations and to correct any problems associated with this contamination if there is DOE authority to do' so. Reviews of historical materials from the 'Manhattan Engineer District (MED) and Atomic Energy Commission (AEC) era conducted in support of this program have identified a number of active and former Department of Defense (DOD) installations and DOD contractor sites involved in activities related to the MED/AEC

447

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

45 45 UY 2 9 1987 Mr. Carl Schafer Director of Environmental Policy Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C. 20301 Dear Mr. Schafer: As you know, the Department of Energy (DOE) is implementing, a program to identify sites that may be radiologically contaminated as a result of.DOE predecessor operations and to correct any problems associated with this contamination if there is DOE authority to do so. Reviews of historical materials from the Manhattan Engineer District (MED) and Atomic Energy Commission (AEC) era conducted in support of this program have identified a number of active and former Department of Defense (DOD) installations and DOD contractor sites involved in activities related to the MED/AEC

448

Mr. William Mendoza Acting Executive Director  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

William Mendoza William Mendoza Acting Executive Director Department of Energy Washing!on, DC 20585 May4, 2011 White House Initiative on Tribal Colleges and Universities Department of Education 400 Maryland A venue, SW Washington, DC 20202 Dear Mr. Mendoza: Enclosed is the Department of Energy's (DOE) Fiscal Year (FY) 2010 Annual Performance Report on our activities to assist Tribal College and Universities (TCUs). DOE is submitting this information in accordance with Executive Order 13270. In FY 2010, DOE provided $275,000 in total expenditures for TCUs, an increase of $169,500 from the amount provided to TCU s in FY 2009. In an effort to raise the level of support in future years, DOE will continue to set funding goals and to identify opportunities for additional

449

Director, health Physics Office Columbia University  

Office of Legacy Management (LM)

f. 3 -J f. 3 -J Mr. Philip tori0 Director, health Physics Office Columbia University 289 Engineering Terrace 520 West 120th Street New York, New York 10027 NY.3 "I A\, 4 f- ' :""5 . . ;. ,_ i._ ' L, Dear Mr. Lorio: The Department of Energy (DOE), as part of its Formerly Utilized Sites Remedial Action Program (FUSRAP), has reviewed information on Columbia University facilities to determine whether they contain residual radioactivity traceable to activities conducted on behalf of the Manhattan Engineer District or the Atomic Energy Commission (predecessors to DOE). A radiological survey indicated that the radiation levels are equal to natural background in all areas not currently in use for licensed operations with radionuclides, Therefore, no remedial action is required,

450

Introductory Remarks - Maurice Goldhaber, Director, Brookhaven National  

NLE Websites -- All DOE Office Websites (Extended Search)

contents as they appeared in the original proceedings contents as they appeared in the original proceedings Return to 1968 Proceedings Home Page Directly Jump to 1st Week 2nd Week 3rd Week 4th Week 5th Week 6th Week Author Index Introductory Remarks - Maurice Goldhaber, Director, Brookhaven National Laboratory iii Editor's Preface - Albert G. Prodell, Brookhaven National Laboratory iv Introduction - John P. Blewett, Brookhaven National Laboratory v FIRST WEEK - SUPERCONDUCTING RF CAVITIES AND LINACS Chairman: H.A. Schwettman, Stanford University (Photos) The Development of Low Temperature Technology at Stanford and its Relevance to High Energy Physics 1 H. Alan Schwettman, Stanford University Q Measurements on Superconducting Cavities at S-Band 13 H. Hahn, H.J. Halama, and E.H. Foster, Brookhaven National Laboratory

451

Photon Sciences Directorate | 2010 Annual Report | People  

NLE Websites -- All DOE Office Websites (Extended Search)

We the People We the People we the people Over 3,000 people carried out the activities of the Photon Sciences Directorate during FY10. This included more than 380 Photon Sciences staff members, 36 employees from other Brookhaven Lab organizations, nearly 340 contractors, and more than 2,200 visiting scientists - or "users" - who came to NSLS during the year to run experiments in fields ranging from biology to materials science. Among the Photon Sciences staff, 22 percent were scientists, 32 percent were professionals (including engineers), 31 percent were technicians, 11 percent were support staff, and 4 percent were managers. Staff from other Brookhaven Lab organizations, who typically worked 50 percent or more of their time on Photon Sciences activities, came from

452

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

oi Energy oi Energy rk rA$i Washington. DC 20545 .-~~~ ~ MY 2 9 1987 Mr. Carl Schafer Director of Environmental Policy Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C. 20301 Dear Mr. Schafer: As you know, the Department of Energy (DOE) is implementing a program to identify sites that may. be radiologically contaminated as a result of DOE predecessor operations and to correct any problems associated with this contamination if there is DOE authority to do so. Reviews of historical materials from the Manhattan Engineer District (MED) and Atomic Energy Cosnnission (AEC) era conducted in support of this program have identified a number of active and former Department of Defense (DOD) installations and DOD contractor sites involved in activities related to the MED/AEC

453

Steam-system upgrades | Open Energy Information  

Open Energy Info (EERE)

Linked Data Page Edit History Share this page on Facebook icon Twitter icon Steam-system upgrades Jump to: navigation, search TODO: Add description List of Steam-system...

454

Upgrading of light Fischer-Tropsch products  

SciTech Connect

The upgrading of Fischer-Tropsch (F-T) light ends was studied at UOP in a program sponsored by the Pittsburgh Energy Technology Center of the US Department of Energy. The goal of the program was to increase the overall yield of marketable transportation fuels from the F-T upgrading complex by focusing on liquefied petroleum gas (LPG) and naphtha. An overview of the entire light-ends program is presented in this paper. Although this contract is specifically concerned with light products (C{sub 3}-C{sub 11}), a separate DOE-sponsored program at UOP investigated the characterization and upgrading of the heavy end of the F-T product spectrum: F-T wax. An economic analysis of the light and heavy ends upgrading was performed to evaluate the conversion of F-T products to marketable transportation fuels. 9 refs., 7 figs., 9 tabs.

Shah, P.P.

1990-11-30T23:59:59.000Z

455

12 GeV Upgrade | Jefferson Lab  

NLE Websites -- All DOE Office Websites

Science Science A Schematic of the 12 GeV Upgrade The 12 GeV Upgrade will greatly expand the research capabilities of Jefferson Lab, adding a fourth experimental hall, upgrading existing halls and doubling the power of the lab's accelerator. A D D I T I O N A L L I N K S: 12 GeV Home Public Interest Scientific Opportunities Hall D Status Updates Contacts Three-Year Accelerator Schedule 2014 - 2016 top-right bottom-left-corner bottom-right-corner 12 GeV Upgrade Physicists at Jefferson Lab are trying to find answers to some of nature's most perplexing questions about the universe by exploring the nucleus of the atom. Their goal is to answer such questions as: "What is the universe made of?" and "What holds everyday matter together?" In their search for answers, physicists smash electrons into atoms using

456

Pricing and Market Segmentation with Software Upgrades.  

E-Print Network (OSTI)

it selects and the number of customers attracted by theseincrease in the number of upgrading customers. Thus, p ? = ?is because: (1) the number of total customers is F c (?) in

Bala, R.; Carr, S. C.

2005-01-01T23:59:59.000Z

457

User and Performance Impacts from Franklin Upgrades  

E-Print Network (OSTI)

J. Lebens. Post- Mortem of the NERSC Franklin XT4 Upgrade toCray User Group Meeting NERSC Franklin Home Page: http://planning from both Cray and NERSC, service interruptions

He, Yun Helen

2009-01-01T23:59:59.000Z

458

Designation Order No. 00-11.00 to the Executive Director of Loan Programs and Director of the Loan Program Guarantee  

Directives, Delegations, and Requirements

Designate each of the Executive Director of Loan Programs and the Director of the Loan Guarantee Program, as the Secretary of Energy's designee, as the term is ...

2010-04-30T23:59:59.000Z

459

Designation Order No. 00-12.00 to the Executive Director of Loan Programs and Director of the Advanced Technology Vehicles Manufacturing Incentive Program  

Directives, Delegations, and Requirements

Secretary or Energy designates each of the Executive Director of Loan Programs and the Director of the Advanced Technology Vehicles Manufacturing Incentive ...

2010-04-30T23:59:59.000Z

460

Commissioning Results of the Upgraded Neutralized Drift Compression Experiment  

E-Print Network (OSTI)

COMMISSIONING RESULTS OF THE UPGRADED NEUTRALIZED DRIFTexperiments. We report on commissioning results of the

Lidia, S.M.

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in  

NLE Websites -- All DOE Office Websites (Extended Search)

Honeymoons Honeymoons Lead to Upgrades in Western Vermont to someone by E-mail Share Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Facebook Tweet about Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Twitter Bookmark Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Google Bookmark Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Delicious Rank Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Digg Find More places to share Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on AddThis.com... Better Buildings Residential Network Progress

462

MEMORANDUM FOR HUMAN RESOURCES DIRECTORS FROM: SUBJECT: ~~k.__--- SARAH J. B LLA, DIRECTOR  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2011 2, 2011 MEMORANDUM FOR HUMAN RESOURCES DIRECTORS FROM: SUBJECT: ~~k.__--- SARAH J. B LLA, DIRECTOR OFFICE OF AN CAPITAL MANAGEMENT POLICY GUIDANCE MEMORANDUM #21 FAMILY MEMBERS The Department of Energy has maintained a broad definition for a family member to include "any individual related by blood or affinity whose close association with the employee is the equivalent of a family relationship". This is part of the definition for a family member that is located on page 7 of the DOE Handbook on Leave and Absence. We believe that it is consistent with the current administration's efforts to extend services and benefits to same-sex partners (see the President's June 2, 2010, memorandum at www.whitehouse.gov/the-press-office/presidential-memorandum-extension-benefits-

463

TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

48 48 DATE: June 7, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: Interim Reporting for Advanced Notifications of Awards (ANA) SUMMARY: With reference to Policy Flash 2012-44 and the postponement of the ANA system production date of June 1, 2012, the increased dollar thresholds remain in effect for advanced notification of award actions. Until the new ANA system is put into production, the existing ANA web portal should still be used by completing and submitting the revised DOE Form 4220.10, Congressional Grant/Contractor Notification. The form is located in STRIPES or at the DOE webpage: http://energy.gov/cio/downloads/congressional-and-intergovernmental-affairs-ci-notification.

464

UCSF Green Campus Residential Resource Efficiency Project  

E-Print Network (OSTI)

UCSF Green Campus Residential Resource Efficiency Project Executive Summary Goal: To help UCSF on tenant behavioral upgrades Data Analysis ·Calculation of predicted savings on water use (gallons), electricity (kWh), and natural gas (therms) if current installations are replaced or upgraded to meet 2010

Yamamoto, Keith

465

The Advanced Light Source Upgrade  

SciTech Connect

The ALS, a third-generation synchrotron light source at Berkeley Lab, has been operating for almost a decade and is generating forefront science by exploiting the high brightness of a third-generation source in three areas: (1) high resolving power for spectroscopy; (2) high spatial resolution for microscopy and spectromicroscopy; and (3) high coherence for experiments such as speckle. However, the ALS was one of the first third-generation machines to be designed, and accelerator and insertion-device technology have significantly changed since its conception. As a result, its performance will inevitably be outstripped by newer, more advanced sources. To remain competitive and then set a new standard, the performance of the ALS, in particular its brightness, must be enhanced. Substantial improvements in brightness and current have always been feasible in principle, but they incur the penalty of a much reduced lifetime, which is totally unacceptable to our users. Significant brightness improvements can be realized in the core soft x-ray region by going to top-off operation, where injection would be quasi-continuous and the lifetime objections disappear. In top-off mode with higher average current, a reduced vertical emittance and beta function, and small-gap permanent-magnet or superconducting insertion devices, one to two orders of magnitude improvement in brightness can be had in the soft x-ray range. These improvements also extend the high energy range of the undulator radiation beyond the current limit of 2000 eV. Descriptions of the upgrade and the important new science achievable are presented.

Chemla, Daniel S.; Feinberg, Benjamin; Hussain, Zahid; Krebs, Gary F.; Padmore, Howard A.; Robin, David S.; Robinson, Arthur L.; Smith, Neville V.

2003-11-04T23:59:59.000Z

466

More Than Adopters: Competing Influences in the Interlocking Directorate  

Science Conference Proceedings (OSTI)

This study explores the competing influences of different types of board interlocks on diffusion of a strategic initiative among a population of firms. We examine a broad social network of interlocking directors in U.S. firms over a period of 17 years ... Keywords: board of directors, diffusion, governance, interlocks, social networks

Brian L. Connelly; Jonathan L. Johnson; Laszlo Tihanyi; Alan E. Ellstrand

2011-05-01T23:59:59.000Z

467

ASHRAE Installs New Officers, Directors DENVER ASHRAE has installed  

E-Print Network (OSTI)

ASHRAE Installs New Officers, Directors DENVER ­ ASHRAE has installed new officers and directors for 2013-14 at its Annual Meeting held here June 22-26. The ASHRAE Presidential Address is viewable on You is William P. "Bill" Bahnfleth, Ph.D., P.E., Fellow ASHRAE, ASME Fellow, a professor of Architectural

Maroncelli, Mark

468

Fermilab | Directorate | Office of Integrated Planning (OIP)...  

NLE Websites -- All DOE Office Websites (Extended Search)

Roles Classifications and Definitions of Managers and Project Managers Realtionship - Job Titles and OHAP Functional Roles Ten Year Planning ExerciseNeeds Analysis FY2011...

469

Director's Discretionary (DD) Program | Argonne Leadership Computing...  

NLE Websites -- All DOE Office Websites (Extended Search)

is not required. Review Process: Projects must demonstrate a need for high-performance computing resources. Reviewed by ALCF. Application Period: ongoing (available year...

470

FROM THE MESSAGE DIRECTOR Alex Fischer I  

NLE Websites -- All DOE Office Websites (Extended Search)

and Biological Sensor Develop- ment Program and by the National Science Foundation. Oil Shale Project Looks for Ways To Extract New Energy W ith gasoline prices averaging more...

471

TEMPLATE FOR EES DIRECTORATE QUARTERLY HIGHLIGHTS  

NLE Websites -- All DOE Office Websites (Extended Search)

limiting the practical application of dual-fuel operation. This project will utilize Titan to perform massively parallel computational fluid dynamic (CFD) engine simulations...

472

Warfighter Support: Principal Associate Directorate for Global...  

NLE Websites -- All DOE Office Websites (Extended Search)

as well as its superiority in C4ISR (command, control, communications, computers, intelligence, surveillance, and reconnaissance) and force projection. Now more than ever, LANL...

473

Statement of Patricia Hoffman, Acting Assistant Director for Electricity  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hoffman, Acting Assistant Director for Hoffman, Acting Assistant Director for Electricity Delivery and Energy Reliability, before the Committee on Energy and Natural Resources U.S. Senate, April 22, 2009. Statement of Patricia Hoffman, Acting Assistant Director for Electricity Delivery and Energy Reliability, before the Committee on Energy and Natural Resources U.S. Senate, April 22, 2009. Statement of Patricia Hoffman, Acting Assistant Director for Electricity Delivery and Energy Reliability, before the Committee on Energy and Natural Resources U.S. Senate, April 22, 2009. S. 548, which seeks to amend the Public Utilities Regulatory Policy Act of 1978 to establish a Federal energy efficiency resource standard for retail electricity and natural gas distributors, and for other purposes. Statement of Patricia Hoffman, Acting Assistant Director for Electricity

474

First NERSC Director John Killeen Dies at 87  

NLE Websites -- All DOE Office Websites (Extended Search)

First NERSC Director First NERSC Director John Killeen Dies at 87 First NERSC Director John Killeen Dies at 87 August 24, 2012 Jon Bashor, Jbashor@lbl.gov, +1 510 486 5849 XBD9908-01785.jpg John Killeen, NERSC's founding director, also directed its two predecessors. John Killeen, the founding director of what is now known as the National Energy Research Scientific Computing Center (NERSC), died August 15, 2012 at age 87. Killeen led the Center from 1974 until 1990, when he retired. The Department of Energy conferred its highest honor, the Distinguished Associate Award, on Killeen in 1980 in recognition of his outstanding contribution to the magnetic fusion energy program. Initially known as the Controlled Thermonuclear Research Computer Center when established in 1974 at Lawrence Livermore National Laboratory, the

475

Beard to lead Business, Operations Directorate; Girrens named head of  

NLE Websites -- All DOE Office Websites (Extended Search)

Carl Beard new PADOPS Director Carl Beard new PADOPS Director Beard to lead Business, Operations Directorate; Girrens named head of Engineering Beard came to Los Alamos in 2006 to help lead the Stockpile Manufacturing and Support organization. May 4, 2011 Carl Beard Carl Beard Contact Steve Sandoval Communicatons Office (505) 665-9206 Email LOS ALAMOS, New Mexico, May 4, 2011-Carl Beard is the new principal associate director for Business and Operations at Los Alamos National Laboratory. Beard succeeds Mike Mallory, who earlier this year announced his retirement. "Carl is a highly accomplished and versatile leader, managing a wide range of scientific and manufacturing operations," Laboratory Director Michael Anastasio said. "At Los Alamos and elsewhere, Carl's teams have improved productivity and safely executed programs," he said, noting that

476

DOE Announces New Executive Director of Loan Guarantee Program | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Executive Director of Loan Guarantee Program Executive Director of Loan Guarantee Program DOE Announces New Executive Director of Loan Guarantee Program November 10, 2009 - 12:00am Addthis Washington D.C. --- Underscoring his commitment to strengthen and streamline the Department of Energy's operations, Secretary Steven Chu today named Jonathan Silver Executive Director of the Department's loan program office. In this role, Silver will oversee the Department's Loan Guarantee Program as well as the Advanced Technology Vehicles Manufacturing (ATVM) loan program. Silver will report directly to Secretary Chu, helping accelerate the application review process for both programs. As Executive Director, Silver will be responsible for staffing the programs and leading origination, analysis, and negotiation, as well as managing the full range of the

477

T/g upgrade adds 15 MW, extends unit life. [Turbogenerator  

SciTech Connect

This article describes turbogenerator upgrade at Maine Yankee's PWR. Maine Yankee Atomic Power Co.'s excellent experience in the upgrading and uprating of the two low-pressure (l-p) steam turbines at its only generating unit - an 865-MW, three-loop pressurized-water reactor installed in 1972 - has motivated the utility to also contract for replacement of both the high-pressure (h-p) steam path and the generator. ABB Power Generation Inc., North Brunswick, NJ, which retrofitted the l-p steam-path components, will handle the other two projects as well.

Not Available

1990-02-01T23:59:59.000Z

478

Disruption Analysis and Response Implicattions of Passive Plates for the NSTX Upgrade  

Science Conference Proceedings (OSTI)

The NSTX upgrade project requires analysis qualifications of existing vacuum vessel and passive stabilizing plates for increased plasma performance. Vertical stability is critically dependent on the passive conducting structure that surrounds the plasma. In this paper, the passive conducting structure is analyzed for the upgrade condition during plasma disruption to ensure the level of stress in the stabilizing plates and the fastener is within its design limits. The counter-bore of the passive plates for bolting is evaluated in details and counter-bore bushing is redesigned to prevent shear failure during disruptions as a result of high pulling and pushing forces, particularly for support at the corner bolts

Yuhu Zhai, Peter Titus, Art Brooks, and Ron Hatcher

2012-08-27T23:59:59.000Z

479

Prepared for the European Commission Directorate General for Energy  

E-Print Network (OSTI)

This final report presents the results of the analyses at relevant trends and features in the EU gas market enabling or limiting more competition. The study focuses in particular on the possible impacts of the implementation of the EU Gas Directive and subsequently of the expected effects of increasing competition and further integration of gas markets in Europe. The study is conducted in the framework of the Shared Analysis project entitled ĎEconomic Foundations for Energy Policy, coordinated by FhG-ISI and prepared for the European Commission Directorate General for Energy. The report contains an analysis of the recent changes in the structure of gas demand and the supply and its consequences for enhancement of competition in the EU gas market. It discusses the role of growing gas demand, changing structure of the supply industry and access to the network. Next, the implementation EU Gas Directive is discussed. In order to deal with the uncertainty in the results of the implementation process, two extreme institutional scenarios for future development of the liberalisation process in the EU gas markets are formulated. Finally the consequences of these two gas market liberalisation scenarios are analysed. Note that part of the conclusions of the expected effects of the Directive, i.e. the expected changes in gas prices

F. Van Oostvoorn; M. G. Boots Abstract

1999-01-01T23:59:59.000Z

480

LS Directorate Science Advisory Committee (SAC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Photon Sciences Science Advisory Committee (SAC) Photon Sciences Science Advisory Committee (SAC) Charter The Photon Sciences Science Advisory Committee (SAC) is responsible for advising the Associate Laboratory Director (ALD) for Photon Sciences on issues related to the scientific utilization of Photon Sciences facilities and on developments required to achieve and maintain the highest possible scientific productivity. In keeping with this, the SAC will provide advice on the following topics: Scientific output and utilization of Photon Sciences facilities Long-term scientific directions Planning, development, and operation of Photon Sciences facilities Policies and procedures relevant to user access and utilization of scientific facilities Members are appointed by the ALD for three-year terms, renewable by mutual consent. The Chair of the Photon Sciences Users' Executive Committee will be an ex-officio member of the SAC. In general, the full SAC will meet at least annually. The ALD, in consultation with the chair of the SAC, may call additional SAC meetings as necessary. The output of the SAC will consist of a confidential report of their findings and recommendations conveyed in a written report submitted to the ALD shortly after each SAC meeting.

Note: This page contains sample records for the topic "upgrade project director" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Climate balance of biogas upgrading systems  

SciTech Connect

One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading) method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO{sub 2}.

Pertl, A., E-mail: andreas.pertl@boku.ac.a [Institute of Waste Management, Department of Water, Atmosphere and Environment, University of Natural Resources and Applied Life Sciences, Vienna, Muthgasse 107, A-1190 Wien (Austria); Mostbauer, P.; Obersteiner, G. [Institute of Waste Management, Department of Water, Atmosphere and Environment, University of Natural Resources and Applied Life Sciences, Vienna, Muthgasse 107, A-1190 Wien (Austria)

2010-01-15T23:59:59.000Z

482

Energy Upgrades to Save Small Arizona Town Big Money | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Upgrades to Save Small Arizona Town Big Money Upgrades to Save Small Arizona Town Big Money Energy Upgrades to Save Small Arizona Town Big Money July 19, 2010 - 1:00pm Addthis An aerial shot of Oro Valley, Ariz.'s town hall campus shows proposed solar locations. | Photo courtesy of Oro Valley An aerial shot of Oro Valley, Ariz.'s town hall campus shows proposed solar locations. | Photo courtesy of Oro Valley Temperatures above 100 degrees mean that staying cool and being energy efficient is important to the small town of Oro Valley, Ariz. But finding the funds to do both can be a challenge. It was this heat - and the availability of a federal grant - that Bayer Vella, the town's conservation and sustainability manager, cited as a reason the city is forging ahead with energy retrofits and solar projects.

483

Oak Ridge EM Program Upgrades Environmental Database for Public's Ease of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Upgrades Environmental Database for Public's Upgrades Environmental Database for Public's Ease of Use Oak Ridge EM Program Upgrades Environmental Database for Public's Ease of Use October 30, 2013 - 12:00pm Addthis Oak Ridge√ʬĬôs environmental database contains data from more than 14 million field samples. These samples provide a clear picture of clean and contaminated areas at the site. Oak Ridge's environmental database contains data from more than 14 million field samples. These samples provide a clear picture of clean and contaminated areas at the site. OAK RIDGE, Tenn. - Oak Ridge is working to remediate contaminated areas in one of the EM program's most diverse and complex cleanup sites due to the research and production that occurred there during the Manhattan Project and Cold War. Oak Ridge employees use an array of tools to educate the public about the

484

D0 Solenoid Upgrade Project: D0 Solenoid Current Leads  

SciTech Connect

This engineering note documents information gathered and design decisions made regarding the vapor cooled current leads for the D-Zero Solenoid. The decision was made during design group meetings that the D-Zero Solenoid, rated at 4825 amps, should use vapor cooled current leads rated at 6000 amps. CDF uses 6000 amp leads from American Magnetics Inc. (AMI) and has two spares in their storage lockers. Because of the spares situation and AMI's reputation, AMI would be the natural choice of vendor. The manufacturer's listed helium consumption is 19.2 liters/hr. From experience with these types of leads, more stable operation is acheived at an increased gas flow. See attached E-Mail message from RLS. We have decided to list the design flow rate at 28.8 liquid liters/hr in the design report. This corresponds to COFs operating point. A question was raised regarding how long the current leads could last at full current should the vapor cooling flow was stopped. This issue was discussed with Scott Smith from AMI. We do not feel that there is a problem for this failure scenario.

Rucinski, R.; /Fermilab

1993-10-04T23:59:59.000Z

485

Health and Safety Plan for NSTX Upgrade Project Tasks  

E-Print Network (OSTI)

and the DOE Hoisting and Rigging Manual. Herein is our site specific Health and Safety Plan for the work-vessel passive plates hardware. Rev 1 2 11/9111 #12;3.0 RESPONSmILITIES, AUTHORITIES, COMMUNICATIONS The Work

Princeton Plasma Physics Laboratory

486

NETL: Oil & Natural Gas Projects: Shale Oil Upgrading Utilizing...  

NLE Websites -- All DOE Office Websites (Extended Search)

Companies providing oil samples of at least five (5) gallons include Chevron, Oil Shale Exploration Company (OSEC), and Red Leaf Resources, Inc. Background Work performed...

487

TEMPLATE FOR EES DIRECTORATE QUARTERLY HIGHLIGHTS  

NLE Websites -- All DOE Office Websites (Extended Search)

SEPTEMBER 2013 SEPTEMBER 2013 The Oak Ridge National Laboratory (ORNL) in Partnership with Industry Awarded a U.S. Department of Energy (DOE) Project on Extending the Driving Range of Electric Vehicles (EVs) The ORNL team consisting of Tim LaClair, Zhiming Gao, Omar Abdelaziz, and Edward A. Vineyard of the Energy and Transportation Science Division is a partner with Delphi on a new U.S. DOE project for extending the driving range of EVs with a phase-change material (PCM) heating system. The objective of this project is to develop and integrate a PCM heating system for vehicles to demonstrate a significant reduction in the energy used for passenger cabin heating in EVs. Other partner members of this project include Ford Motor Company and Entropy Solutions.

488

ATLAS upgrade June09_v3  

NLE Websites -- All DOE Office Websites (Extended Search)

ATLAS efficiency and intensity upgrade ATLAS efficiency and intensity upgrade Guy Savard and Robert V. F. Janssens June 12, 2009 The ATLAS facility is on a constant quest to improve and increase the capabilities it offers to its Users. ATLAS currently provides beams of essentially all stable isotopes at energies in the vicinity of the Coulomb barrier. These can be used in conjunction with a suite of state-of-the-art instruments such as Gammasphere, the Fragment Mass Analyzer (FMA), the Canadian Penning Trap mass spectrometer (CPT), the split-pole spectrograph, an in-flight radioactive beam line, and the recently commissioned HELIOS spectrometer. At present, these capabilities are being augmented by (1) the addition of the CARIBU upgrade, which will provide low-intensity, neutron-rich radioactive beams from Californium fission fragments in both low-energy and re-

489

Director of the National Ignition Facility, Lawrence Livermore National  

NLE Websites -- All DOE Office Websites (Extended Search)

Director of the National Ignition Facility, Lawrence Livermore National Director of the National Ignition Facility, Lawrence Livermore National Laboratory | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Who We Are > In The Spotlight > Edward Moses Director of the National Ignition Facility, Lawrence Livermore National Laboratory

490

Associate director for Physical and Life Sciences, Lawrence Livermore  

National Nuclear Security Administration (NNSA)

Associate director for Physical and Life Sciences, Lawrence Livermore Associate director for Physical and Life Sciences, Lawrence Livermore National Laboratory | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Who We Are > In The Spotlight > William Goldstein Associate director for Physical and Life Sciences, Lawrence Livermore

491

Floodplain Assessment for the Proposed Outdoor Fire Range Upgrades at TA-72 in Lower Sandia Canyon, Los Alamos National Laboratory  

Science Conference Proceedings (OSTI)

Los Alamos National Laboratory (LANL) is preparing to implement actions in Sandia Canyon at Technical Area (TA) 72. Los Alamos National Security (LANS) biologists conducted a floodplain determination and this project is partially located within a 100-year floodplain. The proposed project is to upgrade the existing outdoor shooting range facilities at TA-72. These upgrades will result in increased safety and efficiencies in the training for Protective Force personnel. In order to remain current on training requirements, the firing ranges at TA-72 will be upgraded which will result in increased safety and efficiencies in the training for Protective Force personnel (Figure 1). These upgrades will allow for an increase in class size and more people to be qualified at the ranges. Some of these upgrades will be built within the 100-year floodplain. The upgrades include: concrete pads for turning target systems and shooting positions, new lighting to illuminate the firing range for night fire, a new speaker system for range operations, canopies at two locations, an impact berm at the far end of the 300-yard mark, and a block wall for road protection.

Hathcock, Charles D. [Los Alamos National Laboratory

2012-08-27T23:59:59.000Z

492

R. L. Fu;rknsr, Acting Director  

Office of Legacy Management (LM)

L( i)~J <"j L( i)~J <"j R. L. Fu;rknsr, Acting Director Division of lzlw ?hteri~s ~SJB88~8c~atiOTlhlu aCOI%tre;etfot th6 Sfi6tOth6 C~SSiOrr Of upto2oo,cmpoundru~~ paryear a6 a,bglprobuctfroar ph08$ht6 op6rations at East Tsqm, Pioridaa ma contr8ct jaawides iOr a fi%Rd @C6 Of $4.00 par pound upa Subjact to 6scalatic63 for chmgu in labor sad citaaical COStS UhiCh hSV6 broU&#Xt th6 CUtTWd @C@ t0 $4.17. m C-t C@r68 June 30, i*l Ud6SS th6Cd$siOn o

493

Upgrading of light Fischer-Tropsch products  

SciTech Connect

Work during this quarter concentrated on Task 4 of the study. The objective of this task is to evaluate the application of the UOP/BP Cyclar* process to the upgrading of Fischer-Tropsch LPG products into aromatics. Results from pilot plant studies were translated into commercial yield estimates as described in Quarterly Report No. 7. This quarterly report documents an economic evaluation of the Cyclar process for converting LPG into aromatics in a Fischer-Tropsch upgrading complex. 1 ref., 11 figs., 9 tabs.

1989-07-11T23:59:59.000Z

494

Energy Upgrade of the Siam Photon Source  

SciTech Connect

The energy upgrade of the storage ring is part of the plans to develop x-ray production capability of the Siam Photon Source. Simulations have been carried out. The bending magnet power supply has been replaced. Energy of the injected 1 GeV beam from the injector is then ramped up 20% in the storage ring. Studies for modification of bending magnet poles have been done to evaluate possibility of further increasing the beam energy to 1.4 GeV in the future. Studies of the energy upgrade plan and details of energy ramping process, together with beam measurements are presented.

Rugmai, S.; Rujirawat, S. [National Synchrotron Research Center, P.O. Box 93, Nakhon Ratchasima, 30000 (Thailand); School of Physics, Suranaree University of Technology, 111 University Avenue, Muang Distrct, Nakhon Ratchasima, 30000 (Thailand); Hoyes, G. G.; Prawanta, S.; Kwankasem, A.; Siriwattanapitoon, S.; Suradet, N.; Pimol, P.; Junthong, N.; Boonsuya, S.; Janpuang, P.; Prawatsri, P.; Klysubun, P. [National Synchrotron Research Center, P.O. Box 93, Nakhon Ratchasima, 30000 (Thailand)

2007-01-19T23:59:59.000Z

495

Microsoft Word - CX-RossControlHouseSeismicUpgrades_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Leon Kempner Project Manager - TEL-TPP-3 Proposed Action: Perform structural upgrades to the Ross Control House to allow the building to withstand a seismic event. PP&A Project No.: PP&A-2051 Budget Information: Work Order # 00215487 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Ôā∑ B2.5 Safety and environmental improvements of a facility, including replacement and upgrade of facility components...Improvements may include...addition of structural bracing to meet earthquake standards... Location: The proposed project is located at the BPA Ross Control House within the Ross Complex in Vancouver, Washington. The facility is within the NW 1/4 of Section 14, Township 2 North,

496

GAS/LIQUID MEMBRANES FOR NATURAL GAS UPGRADING  

SciTech Connect

Efforts this quarter have concentrated on legal agreements, including alternative field sites. Preliminary design of the bench-scale equipment continues. Gas Technology Institute (GTI) is conducting this research program whose objective is to develop gas/liquid membranes for natural gas upgrading to assist DOE in achieving their goal of developing novel methods of upgrading low quality natural gas to meet pipeline specifications. Kvaerner Process Systems (KPS) and W. L. Gore & Associates (GORE) gas/liquid membrane contactors are based on expanded polytetrafluoroethylene (ePTFE) membranes acting as the contacting barrier between the contaminated gas stream and the absorbing liquid. These resilient membranes provide much greater surface area for transfer than other tower internals, with packing densities five to ten times greater, resulting in equipment 50--70% smaller and lower weight for the same treating service. The scope of the research program is to (1) build and install a laboratory- and a field-scale gas/liquid membrane absorber; (2) operate the units with a low quality natural gas feed stream for sufficient time to verify the simulation model of the contactors and to project membrane life in this severe service; and (3) conducted an economic evaluation, based on the data, to quantify the impact of the technology. Chevron, one of the major producers of natural gas, has offered to host the test at a gas treating plant. KPS will use their position as a recognized leader in the construction of commercial amine plants for building the unit along with GORE providing the membranes. GTI will provide operator and data collection support during lab- and field-testing to assure proper analytical procedures are used. Kvaerner and GTI will perform the final economic evaluation. GTI will provide project management and be responsible for reporting and interactions with DOE on this project.

Howard S. Meyer

2002-06-30T23:59:59.000Z

497

Deputy Director for Resource Management Homepage | U.S. DOE Office...  

Office of Science (SC) Website

Deputy Director Biography Organization Contact Information Deputy Director for Resource Management U.S. Department of Energy SC-4Forrestal Building 1000 Independence Ave., SW...

498

NSLS-II Integrated Project Team (IPT)  

NLE Websites -- All DOE Office Websites (Extended Search)

NSLS-II Integrated Project Team NSLS-II Integrated Project Team DOE uses an integrated project teaming approach for managing the NSLS-II Project. This Integrated Project Team (IPT), organized and led by the NSLS-II Federal Project Director, is an essential element in DOE's acquisition process and is being used during all phases of the project's life cycle. This team consists of professionals representing diverse disciplines with the specific knowledge, skills, and abilities to support the Federal Project Director in successfully executing the project. The IPT for the NSLS-II Project will consist of members from both DOE and the contractor, Brookhaven Science Associates (BSA). The team membership will change as the project progresses from initiation to closeout to ensure the necessary skills are always represented to meet the project's needs.

499

STANDARDIZATION OF CEBAF 12 GEV UPGRADE CAVITY TESTING  

SciTech Connect

CEBAF 12GeV upgrade project includes 80 new 7-cell cavities to form 10 cryomodules. Each cavity underwent RF qualification at 2.07K using a high power accelerating gradient test and an HOM survey in Jefferson Lab's Vertical Testing Area (VTA) before cavity string assembly. In order to ensure consistently high quality data, updated cavity testing procedures and analysis were implemented and used by a group of VTA operators. For high power tests, a cavity testing procedure was developed and used in conjunction with a LabVIEW program to collect the test data. Additionally while the cavity was at 2.07K, an HOM survey was performed using a network analyzer and a combination of Excel and Mathematica programs. Data analysis was standardized and an online logbook, Pansophy, was used for data storage and mining. The Pansophy system allowed test results to be easily summarized and searchable across all cavity tests. In this presentation, the CEBAF 12GeV upgrade cavity testing procedure, method for data analysis, and results reporting results will be discussed.

Tiffany Bass, G. Davis, Christiana Wilson, Mircea Stirbet

2012-07-01T23:59:59.000Z

500

Financing; A Cost Effective Alternative When Upgrading Energy Efficient Systems  

E-Print Network (OSTI)

In the 1990's, many organizations are attempting to do more, faster, with less cost and improved quality. In many cases, this involves improving the efficiency of their systems. Increased competition is creating pressure to continuously improve in order to effectively compete in the marketplace. One obvious method of reducing costs and improving productivity is to upgrade old, antiquated equipment such as lighting to more modern energy efficient systems. Most projects provide a return on investment to the owner in several years, through energy and demand savings, Power Utility rebates, maintenance savings and increased productivity, however, the initial capital expense required is cost prohibitive. Budget constraints, a lengthy and complicated approval process and large up-front capital requirements are only a few "road blocks" to improvement. In order to make an equipment acquisition, every company must consider how they will pay for it! How do companies acquire the equipment they need to be more competitive? One cost effective solution -FINANCING! There are numerous benefits to both the end user customer (Lessee) and the installing contractor from utilizing financing to upgrade or retrofit to energy efficient systems. It is possible to provide design, material, installation, maintenance and soft costs as well as positive cash flow to the end user by structuring financing terms and payments around the energy savings. A wide array of programs and services are offered by many different financial organizations.

Ertle, J. M.

1994-04-01T23:59:59.000Z