Updating MIT's cost estimation model for shipbuilding  

E-Print Network [OSTI]

This thesis project will update the MIT ship cost estimation model by combining the two existing models (the Basic Military Training School (BMTS) Cost Model and the MIT Math Model) in order to develop a program that can ...

Smith, Matthew B., Lieutenant, junior grade

2008-01-01T23:59:59.000Z

2

Updated Capital Cost Estimates for Utility Scale Electricity  

E-Print Network [OSTI]

Updated Capital Cost Estimates for Utility Scale Electricity Generating Plants April 2013 Information Administration | Updated Capital Cost Estimates for Utility Scale Electricity Generating Plants ii for Utility Scale Electricity Generating Plants ii Contents Introduction

3

Updated cost estimates of meeting geothermal hydrogen sulfide emission regulations  

SciTech Connect (OSTI)

A means of estimating the cost of hydrogen sulfide (H/sub 2/S) emission control was investigated. This study was designed to derive H/sub 2/S emission abatement cost functions and illustrate the cost of H/sub 2/S emission abatement at a hydrothermal site. Four tasks were undertaken: document the release of H/sub 2/S associated with geothermal development; review H/sub 2/S environmental standards; develop functional relationships that may be used to estimate the most cose-effective available H/sub 2/S abatement process; and use the cost functions to generate abatement cost estimates for a specific site. The conclusions and recommendations derived from the research are presented. The definition of the term impacts as used in this research is discussed and current estimates of the highest expected H/sub 2/S concentrations of in geothermal reservoirs are provided. Regulations governing H/sub 2/S emissions are reviewed and a review of H/sub 2/S control technology and a summary of the control cost functions are included. A case study is presented to illustrate H/sub 2/S abatement costs at the Baca KGRA in New Mexico.

Wells, K.D.; Currie, J.W.; Weakley, S.A.; Ballinger, M.Y.

1981-08-01T23:59:59.000Z

4

Updated Capital Cost Estimates for Utility Scale Electricity Generating Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500II Field Emission SEM with EDAXUpdated Capital Cost Estimates

5

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2009 Update  

Fuel Cell Technologies Publication and Product Library (EERE)

This report is the third annual update of a comprehensive automotive fuel cell cost analysis. It contains estimates for material and manufacturing cost of complete 80 kWnet direct hydrogen proton exch

6

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2007 Update  

Fuel Cell Technologies Publication and Product Library (EERE)

This report estimates fuel cell system cost for systems produced in the years 2007, 2010, and 2015, and is the first annual update of a comprehensive automotive fuel cell cost analysis.

7

Mass Production Cost Estimation For Direct H2 PEM Fuel Cell Systesm for Automotive Applications: 2010 Update  

Fuel Cell Technologies Publication and Product Library (EERE)

This report is the fourth annual update of a comprehensive automotive fuel cell cost analysis. It contains estimates for material and manufacturing costs of complete 80 kWnet direct?hydrogen proton ex

8

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2008 Update  

Fuel Cell Technologies Publication and Product Library (EERE)

This report estimates fuel cell system cost for systems produced in the years 2006, 2010, and 2015, and is the second annual update of a comprehensive automotive fuel cell cost analysis.

9

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2008 Update  

Broader source: Energy.gov [DOE]

Report estimates fuel cell system cost for systems produced in the years 2006, 2010, and 2015, and is the second annual update of a comprehensive automotive fuel cell cost analysis.

10

Cost Estimator  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a senior cost and schedule estimator who is responsible for preparing life-cycle cost and schedule estimates and analyses associated with the...

11

Operating Costs Estimates Cost Indices  

E-Print Network [OSTI]

to update costs of specific equipment, raw material or labor or CAPEX and OPEX of entire plants Cost Indices

Boisvert, Jeff

12

Estimating Specialty Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Specialty costs are those nonstandard, unusual costs that are not typically estimated. Costs for research and development (R&D) projects involving new technologies, costs associated with future regulations, and specialty equipment costs are examples of specialty costs. This chapter discusses those factors that are significant contributors to project specialty costs and methods of estimating costs for specialty projects.

1997-03-28T23:59:59.000Z

13

Mass Production Cost Estimation of Direct Hydrogen PEM Fuel Cell...  

Broader source: Energy.gov (indexed) [DOE]

Mass Production Cost Estimation of Direct Hydrogen PEM Fuel Cell Systems for Transportation Applications: 2012 Update Mass Production Cost Estimation of Direct Hydrogen PEM Fuel...

14

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Broader source: Energy.gov (indexed) [DOE]

07 Update Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2007 Update This report estimates fuel cell system cost for systems...

15

Cost Estimation Package  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter focuses on the components (or elements) of the cost estimation package and their documentation.

1997-03-28T23:59:59.000Z

16

Systems Engineering Cost Estimation  

E-Print Network [OSTI]

on project, human capital impact. 7 How to estimate Cost? Difficult to know what we are building early on1 Systems Engineering Lecture 3 Cost Estimation Dr. Joanna Bryson Dr. Leon Watts University of Bath: Contrast approaches for estimating software project cost, and identify the main sources of cost

Bryson, Joanna J.

17

Costs of Oil Dependence: A 2000 Update  

SciTech Connect (OSTI)

Oil dependence remains a potentially serious economic and strategic problem for the United States. This report updates previous estimates of the costs of oil dependence to the U.S. economy and introduces several methodological enhancements. Estimates of the costs to the U.S. economy of the oil market upheavals of the last 30 years are in the vicinity of $7 trillion, present value 1998 dollars, about as large as the sum total of payments on the national debt over the same period. Simply adding up historical costs in 1998 dollars without converting to present value results in a Base Case cost estimate of $3.4 trillion. Sensitivity analysis indicates that cost estimates are sensitive to key parameters. A lower bound estimate of $1.7 trillion and an upper bound of $7.1 trillion (not present value) indicate that the costs of oil dependence have been large under almost any plausible set of assumptions. These cost estimates do not include military, strategic or political costs associated with U.S. and world dependence on oil imports.

Greene, D.L.

2000-05-17T23:59:59.000Z

18

Cost of Oil Dependence: A 2000 Update  

SciTech Connect (OSTI)

Oil dependence remains a potentially serious economic and strategic problem for the United States. This report updates previous estimates of the costs of oil dependence to the U.S. economy and introduces several methodological enhancements. Estimates of the costs to the U.S. economy of the oil market upheavals of the last 30 years are in the vicinity of $7 trillion, present value 1998 dollars, about as large as the sum total of payments on the national debt over the same period. Simply adding up historical costs in 1998 dollars without converting to present value results in a Base Case cost estimate of $3.4 trillion. Sensitivity analysis indicates that cost estimates are sensitive to key parameters. A lower bound estimate of $1.7 trillion and an upper bound of $7.1 trillion (not present value) indicate that the costs of oil dependence have been large under almost any plausible set of assumptions. These cost estimates do not include military, strategic or political costs associated with U.S. and world dependence on oil imports.

Greene, D.L.; Tishchishyna, N.I.

2000-05-01T23:59:59.000Z

19

Types of Costs Types of Cost Estimates  

E-Print Network [OSTI]

· Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408: Mining% accuracy. ­ 2-5% of pre-production capital Types of Cost Estimates #12;3. Definitive ­ Based on definitive-even $ Production Level Fixed Cost Break-even $ Production Level Cost-Revenue Relationships · Capital Costs (or

Boisvert, Jeff

20

Types of Costs Types of Cost Estimates  

E-Print Network [OSTI]

05-1 · Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408-Revenue Relationships · Capital Costs (or first cost or capital investment): ­ Expenditures made to acquire or develop capital assets ­ Three main classes of capital costs: 1. Depreciable Investment: · Investment allocated

Boisvert, Jeff

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Mass Production Cost Estimation of Direct Hydrogen PEM Fuel Cell...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Mass Production Cost Estimation of Direct H 2 PEM Fuel Cell Systems for Transportation Applications: 2012 Update October 18, 2012 Prepared By: Brian D. James Andrew B. Spisak...

22

Cost Estimating Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. No cancellations.

2011-05-09T23:59:59.000Z

23

Check Estimates and Independent Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Check estimates and independent cost estimates (ICEs) are tools that can be used to validate a cost estimate. Estimate validation entails an objective review of the estimate to ensure that estimate criteria and requirements have been met and well documented, defensible estimate has been developed. This chapter describes check estimates and their procedures and various types of independent cost estimates.

1997-03-28T23:59:59.000Z

24

Cost Model and Cost Estimating Software  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter discusses a formalized methodology is basically a cost model, which forms the basis for estimating software.

1997-03-28T23:59:59.000Z

25

Update on the Cost of Nuclear Power  

E-Print Network [OSTI]

We update the cost of nuclear power as calculated in the MIT (2003) Future of Nuclear Power study. Our main focus is on the changing cost of construction of new plants. The MIT (2003) study provided useful data on the cost ...

Parsons, John E.

2009-01-01T23:59:59.000Z

26

Cost Estimating, Analysis, and Standardization  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish policy and responsibilities for: (a) developing and reviewing project cost estimates; (b) preparing independent cost estimates and analysis; (c) standardizing cost estimating procedures; and (d) improving overall cost estimating and analytical techniques, cost data bases, cost and economic escalation models, and cost estimating systems. Cancels DOE O 5700.2B, dated 8-5-1983; DOE O 5700.8, dated 5-27-1981; and HQ 1130.1A, dated 12-30-1981. Canceled by DOE O 5700.2D, dated 6-12-1992

1984-11-02T23:59:59.000Z

27

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Broader source: Energy.gov (indexed) [DOE]

Application: 2009 Update Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Application: 2009 Update This report is the third annual update of a...

28

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Broader source: Energy.gov (indexed) [DOE]

10 Update Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2010 Update This report is the fourth annual update of a comprehensive...

29

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating...

30

Use of Cost Estimating Relationships  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Cost Estimating Relationships (CERs) are an important tool in an estimator's kit, and in many cases, they are the only tool. Thus, it is important to understand their limitations and characteristics. This chapter discusses considerations of which the estimator must be aware so the Cost Estimating Relationships can be properly used.

1997-03-28T23:59:59.000Z

31

Life Cycle Cost Estimate  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Life-cycle costs (LCCs) are all the anticipated costs associated with a project or program alternative throughout its life. This includes costs from pre-operations through operations or to the end of the alternative.This chapter discusses life cycle costs and the role they play in planning.

1997-03-28T23:59:59.000Z

32

Cost update technology, safety, and costs of decommissioning a reference uranium hexafluoride conversion plant  

SciTech Connect (OSTI)

The purpose of this study is to update the cost estimates developed in a previous report, NUREG/CR-1757 (Elder 1980) for decommissioning a reference uranium hexafluoride conversion plant from the original mid-1981 dollars to values representative of January 1993. The cost updates were performed by using escalation factors derived from cost index trends over the past 11.5 years. Contemporary price quotes wee used for costs that have increased drastically or for which is is difficult to find a cost trend. No changes were made in the decommissioning procedures or cost element requirements assumed in NUREG/CR-1757. This report includes only information that was changed from NUREG/CR-1757. Thus, for those interested in detailed descriptions and associated information for the reference uranium hexafluoride conversion plant, a copy of NUREG/CR-1757 will be needed.

Miles, T.L.; Liu, Y.

1995-08-01T23:59:59.000Z

33

Types of Cost Estimates  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The chapter describes the estimates required on government-managed projects for both general construction and environmental management.

1997-03-28T23:59:59.000Z

34

Estimating Renewable Energy Costs  

Broader source: Energy.gov [DOE]

Some renewable energy measures, such as daylighting, passive solar heating, and cooling load avoidance, do not add much to the cost of a building. However, renewable energy technologies typically...

35

Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for Transportation Applications: 2013 Update Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems...

36

AN OVERVIEW OF TOOL FOR RESPONSE ACTION COST ESTIMATING (TRACE)  

SciTech Connect (OSTI)

Tools and techniques that provide improved performance and reduced costs are important to government programs, particularly in current times. An opportunity for improvement was identified for preparation of cost estimates used to support the evaluation of response action alternatives. As a result, CH2M HILL Plateau Remediation Company has developed Tool for Response Action Cost Estimating (TRACE). TRACE is a multi-page Microsoft Excel{reg_sign} workbook developed to introduce efficiencies into the timely and consistent production of cost estimates for response action alternatives. This tool combines costs derived from extensive site-specific runs of commercially available remediation cost models with site-specific and estimator-researched and derived costs, providing the best estimating sources available. TRACE also provides for common quantity and key parameter links across multiple alternatives, maximizing ease of updating estimates and performing sensitivity analyses, and ensuring consistency.

FERRIES SR; KLINK KL; OSTAPKOWICZ B

2012-01-30T23:59:59.000Z

37

Examples of Cost Estimation Packages  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Estimates can be performed in a variety of ways. Some of these are for projects for an undefined scope, a conventional construction project, or where there is a level of effort required to complete the work. Examples of cost estimation packages for these types of projects are described in this appendix.

1997-03-28T23:59:59.000Z

38

Hydrogen Production Cost Estimate Using Biomass Gasification...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Production Cost Estimate Using Biomass Gasification: Independent Review Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review This independent review is...

39

Estimating Specialty Costs - DOE Directives, Delegations, and...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

project specialty costs and methods of estimating costs for specialty projects. g4301-1chp20.pdf -- PDF Document, 56 KB Writer: John Makepeace Subjects: Administration Management...

40

Costs of U.S. Oil Dependence: 2005 Update  

SciTech Connect (OSTI)

For thirty years, dependence on oil has been a significant problem for the United States. Oil dependence is not simply a matter of how much oil we import. It is a syndrome, a combination of the vulnerability of the U.S. economy to higher oil prices and oil price shocks and a concentration of world oil supplies in a small group of oil producing states that are willing and able to use their market power to influence world oil prices. Although there are vitally important political and military dimensions to the oil dependence problem, this report focuses on its direct economic costs. These costs are the transfer of wealth from the United States to oil producing countries, the loss of economic potential due to oil prices elevated above competitive market levels, and disruption costs caused by sudden and large oil price movements. Several enhancements have been made to methods used in past studies to estimate these costs, and estimates of key parameters have been updated based on the most recent literature. It is estimated that oil dependence has cost the U.S. economy $3.6 trillion (constant 2000 dollars) since 1970, with the bulk of the losses occurring between 1979 and 1986. However, if oil prices in 2005 average $35-$45/bbl, as recently predicted by the U.S. Energy Information Administration, oil dependence costs in 2005 will be in the range of $150-$250 billion. Costs are relatively evenly divided between the three components. A sensitivity analysis reflecting uncertainty about all the key parameters required to estimate oil dependence costs suggests that a reasonable range of uncertainty for the total costs of U.S. oil dependence over the past 30 years is $2-$6 trillion (constant 2000 dollars). Reckoned in terms of present value using a discount rate of 4.5%, the costs of U.S. oil dependence since 1970 are $8 trillion, with a reasonable range of uncertainty of $5 to $13 trillion.

Greene, D.L.

2005-03-08T23:59:59.000Z

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Supplemental report on cost estimates'  

SciTech Connect (OSTI)

The Office of Management and Budget (OMB) and the U.S. Army Corps of Engineers have completed an analysis of the Department of Energy's (DOE) Fiscal Year (FY) 1993 budget request for its Environmental Restoration and Waste Management (ERWM) program. The results were presented to an interagency review group (IAG) of senior-Administration officials for their consideration in the budget process. This analysis included evaluations of the underlying legal requirements and cost estimates on which the ERWM budget request was based. The major conclusions are contained in a separate report entitled, ''Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program.'' This Corps supplemental report provides greater detail on the cost analysis.

NONE

1992-04-29T23:59:59.000Z

42

Hydrogen Production Cost Estimate Using Biomass Gasification  

E-Print Network [OSTI]

Hydrogen Production Cost Estimate Using Biomass Gasification National Renewable Energy Laboratory% postconsumer waste #12;i Independent Review Panel Summary Report September 28, 2011 From: Independent Review Panel, Hydrogen Production Cost Estimate Using Biomass Gasification To: Mr. Mark Ruth, NREL, DOE

43

The development of an updatable series of problems that can be used to demonstrate construction cost estimating principles to students of civil engineering and building construction  

E-Print Network [OSTI]

Construction Equipment 5 Prices Summarize Equipment Costs Calculate Labor Manhours Determine wage Rates and Crew Mixes Price out Labor Obtain Material Prices 5 Availabilities Assemble Direct Cost Items Determine Overhead Personnel Calculate Labor Burden... is solving a problem from his text us1ng a labor rate of $2 per hour for a carpenter when the present rate is in excess of $8 per hour. He knows that the expected "right" answer is go1ng to be wrong by at least 400K. Pulver tried to overcome this cost...

Tiner, Wayne Douglas

2012-06-07T23:59:59.000Z

44

Cost Model and Cost Estimating Software - DOE Directives, Delegations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

is basically a cost model, which forms the basis for estimating software. g4301-1chp22.pdf -- PDF Document, 190 KB Writer: John Makepeace Subjects: Administration...

45

Energy storage systems cost update : a study for the DOE Energy Storage Systems Program.  

SciTech Connect (OSTI)

This paper reports the methodology for calculating present worth of system and operating costs for a number of energy storage technologies for representative electric utility applications. The values are an update from earlier reports, categorized by application use parameters. This work presents an update of energy storage system costs assessed previously and separately by the U.S. Department of Energy (DOE) Energy Storage Systems Program. The primary objective of the series of studies has been to express electricity storage benefits and costs using consistent assumptions, so that helpful benefit/cost comparisons can be made. Costs of energy storage systems depend not only on the type of technology, but also on the planned operation and especially the hours of storage needed. Calculating the present worth of life-cycle costs makes it possible to compare benefit values estimated on the same basis.

Schoenung, Susan M. (Longitude 122 West, Menlo Park, CA)

2011-04-01T23:59:59.000Z

46

Cost Estimating Handbook for Environmental Restoration  

SciTech Connect (OSTI)

Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals.

NONE

1990-09-01T23:59:59.000Z

47

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for  

E-Print Network [OSTI]

Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2010 Update it represents, the DOE has established detailed cost targets for automotive fuel cell systems and components of automotive fuel cell systems as progress is made in fuel cell technology. The purpose of these cost analyses

48

Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for  

E-Print Network [OSTI]

1 Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for Transportation (2012), annually updated costs analyses will be conducted for PEM fuel cell passenger buses as well established detailed cost targets for automotive fuel cell systems and components. To help achieve

49

2009 Cost Estimates of Establishing and  

E-Print Network [OSTI]

2009 Cost Estimates of Establishing and Producing Gala Apples in Washington WASHINGTON STATE include estimating 1) the costs of the equipment, materials, supplies, and labor required to establish for any particular orchard operation due to case-specific: · Capital, labor, and natural resources · Crop

Collins, Gary S.

50

2013 Cost Estimation of Establishing a  

E-Print Network [OSTI]

1 2013 Cost Estimation of Establishing a Cider Apple Orchard in Western Washington W A S H I N G factors: · Capital, labor, and natural resources · Crop yield · Cultural practices · Input prices Cost estimations in this enterprise budget also vary depending on the budget's intended use. To avoid

Collins, Gary S.

51

Mandatory Photovoltaic System Cost Estimate  

Broader source: Energy.gov [DOE]

At the request of a customer or a potential customer, Colorado electric utilities are required to conduct a cost comparison of a photovoltaic (PV) system to any proposed distribution line extension...

52

Updating Texas Energy Cost Containment Audit Reports  

E-Print Network [OSTI]

In 1984 and 1986, 35.3 million square feet of state owned buildings were audited to identify cost saving retrofit projects. Originally intended for direct legislative funding or bond sales, funding became available in 1989 through oil overcharge...

Burke, T. E.; Heffington, W. M.

1989-01-01T23:59:59.000Z

53

Process Equipment Cost Estimation, Final Report  

SciTech Connect (OSTI)

This report presents generic cost curves for several equipment types generated using ICARUS Process Evaluator. The curves give Purchased Equipment Cost as a function of a capacity variable. This work was performed to assist NETL engineers and scientists in performing rapid, order of magnitude level cost estimates or as an aid in evaluating the reasonableness of cost estimates submitted with proposed systems studies or proposals for new processes. The specific equipment types contained in this report were selected to represent a relatively comprehensive set of conventional chemical process equipment types.

H.P. Loh; Jennifer Lyons; Charles W. White, III

2002-01-01T23:59:59.000Z

54

Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive Applications: Fuel Cell Tech Team Review Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive...

55

Hydrogen Supply: Cost Estimate for Hydrogen Pathways-Scoping...  

Broader source: Energy.gov (indexed) [DOE]

Supply: Cost Estimate for Hydrogen Pathways-Scoping Analysis. January 22, 2002-July 22, 2002 Hydrogen Supply: Cost Estimate for Hydrogen Pathways-Scoping Analysis. January 22,...

56

Research Summary Estimating Woodfuel Resource Cost Curves  

E-Print Network [OSTI]

Research Summary Estimating Woodfuel Resource Cost Curves As a renewable energy source, woodfuel and extraction methods. Background Just under half of the final energy consumed in the UK (49%) is in the form working slope for the chosen type of machinery) and soil conditions (risk of soil damage). Note

57

Nitrogen trifluoride global emissions estimated from updated atmospheric measurements  

E-Print Network [OSTI]

Nitrogen trifluoride global emissions estimated from updated atmospheric measurements Tim Arnolda,1's radiative budget; however, our understand- ing of its atmospheric burden and emission rates has been limited together with an atmo- spheric model and inverse method, we estimate that the global emissions of NF3

Severinghaus, Jeffrey P.

58

June 5, 2001 1 FIRE Cost Estimate  

E-Print Network [OSTI]

ign Aw ard & Mobilize Ex c av ation Construct FIRE Building EA FONSI EIS PSA R DOE Approval FSA R ORR Systems $343.8M$78.5M$266.3M1 ­ Fusion Core Systems Total (FY99M$) Contingency (FY99M$) Cost (FY99M$) WBS Element #12;June 5, 2001 6 Fusion Core Systems Estimate $343.8M$78.5M$266.3MTotal Fusion Core Systems $10

59

Development of a right-of-way cost estimation and cost estimate management process framework for highway projects  

E-Print Network [OSTI]

Escalation of right-of-way (ROW) costs have been shown to be a prime contributor to project cost escalation in the highway industry. Two problems contribute to ROW cost escalation: 1) the ROW cost estimation and cost estimate management process...

Lucas, Matthew Allen

2009-05-15T23:59:59.000Z

60

Check Estimates and Independent Costs - DOE Directives, Delegations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

estimates and their procedures and various types of independent cost estimates. g4301-1chp13.pdf -- PDF Document, 33 KB Writer: John Makepeace Subjects: Administration Management...

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Types of Cost Estimates - DOE Directives, Delegations, and Requirement...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CURRENT DOE G 430.1-1 Chp 4, Types of Cost Estimates by John Makepeace Functional areas: Procurement, Project Management The chapter describes the estimates required on...

62

Cost and production estimation for a cutter suction dredge  

E-Print Network [OSTI]

The need for accurate cost estimates is well recognized in the dredging industry. In order for a dredging contractor to efficiently execute a project from its conception to its completion, an accurate estimate of the final cost is imperative...

Miertschin, Michael Wayne

2012-06-07T23:59:59.000Z

63

ICPP tank farm closure study. Volume 3: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates  

SciTech Connect (OSTI)

This volume contains information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the six options described in Volume 1, Section 2: Option 1 -- Total removal clean closure; No subsequent use; Option 2 -- Risk-based clean closure; LLW fill; Option 3 -- Risk-based clean closure; CERCLA fill; Option 4 -- Close to RCRA landfill standards; LLW fill; Option 5 -- Close to RCRA landfill standards; CERCLA fill; and Option 6 -- Close to RCRA landfill standards; Clean fill. This volume is divided into two portions. The first portion contains the cost and planning schedule estimates while the second portion contains life-cycle costs and yearly cash flow information for each option.

NONE

1998-02-01T23:59:59.000Z

64

Estimating the Economic Cost of Sea-Level Rise  

E-Print Network [OSTI]

To improve the estimate of economic costs of future sea-level rise associated with global climate change,

Sugiyama, Masahiro.

65

Using Natural Gas Transmission Pipeline Costs to Estimate Hydrogen Pipeline Costs  

E-Print Network [OSTI]

future estimates of hydrogen pipelines. Construction Cost (does this mean for hydrogen pipelines? The objective of thisinto the cost of hydrogen pipelines. To this end I will

Parker, Nathan

2004-01-01T23:59:59.000Z

66

Cost Estimation for Cross-organizational ERP Projects: Research Perspectives  

E-Print Network [OSTI]

Cost Estimation for Cross-organizational ERP Projects: Research Perspectives Maya Daneva, Roel There are many methods for estimating size, effort, schedule and other cost aspects of IS projects, but only one domain of cross-organizational ERP cost estimation, to survey available solutions, and to propose

Wieringa, Roel

67

IDC RP2 & 3 US Industry Standard Cost Estimate Summary.  

SciTech Connect (OSTI)

Sandia National Laboratories has prepared a ROM cost estimate for budgetary planning for the IDC Reengineering Phase 2 & 3 effort, using a commercial software cost estimation tool calibrated to US industry performance parameters. This is not a cost estimate for Sandia to perform the project. This report provides the ROM cost estimate and describes the methodology, assumptions, and cost model details used to create the ROM cost estimate. ROM Cost Estimate Disclaimer Contained herein is a Rough Order of Magnitude (ROM) cost estimate that has been provided to enable initial planning for this proposed project. This ROM cost estimate is submitted to facilitate informal discussions in relation to this project and is NOT intended to commit Sandia National Laboratories (Sandia) or its resources. Furthermore, as a Federally Funded Research and Development Center (FFRDC), Sandia must be compliant with the Anti-Deficiency Act and operate on a full-cost recovery basis. Therefore, while Sandia, in conjunction with the Sponsor, will use best judgment to execute work and to address the highest risks and most important issues in order to effectively manage within cost constraints, this ROM estimate and any subsequent approved cost estimates are on a 'full-cost recovery' basis. Thus, work can neither commence nor continue unless adequate funding has been accepted and certified by DOE.

Harris, James M.; Huelskamp, Robert M.

2015-01-01T23:59:59.000Z

68

A study of design oriented cost estimation  

E-Print Network [OSTI]

except for the cost of material, and does not distinguish direct and indirect costs involved in the production. Vernon (1968) describes costs as standard or actual. Standard cost is a predicted cost reflecting what a part or product should cost, while... parts only. Some researchers have used the component cost in making decisions regarding the manufacturing process. Egbelu and others (Egbelu et al. , 1982) describe a model for making decisions about cast parts. They define a relationship associating...

Raman, Ramchand P.

1992-01-01T23:59:59.000Z

69

Developing a Cost Model and Methodology to Estimate Capital Costs for Thermal Energy Storage  

SciTech Connect (OSTI)

This report provides an update on the previous cost model for thermal energy storage (TES) systems. The update allows NREL to estimate the costs of such systems that are compatible with the higher operating temperatures associated with advanced power cycles. The goal of the Department of Energy (DOE) Solar Energy Technology Program is to develop solar technologies that can make a significant contribution to the United States domestic energy supply. The recent DOE SunShot Initiative sets a very aggressive cost goal to reach a Levelized Cost of Energy (LCOE) of 6 cents/kWh by 2020 with no incentives or credits for all solar-to-electricity technologies.1 As this goal is reached, the share of utility power generation that is provided by renewable energy sources is expected to increase dramatically. Because Concentrating Solar Power (CSP) is currently the only renewable technology that is capable of integrating cost-effective energy storage, it is positioned to play a key role in providing renewable, dispatchable power to utilities as the share of power generation from renewable sources increases. Because of this role, future CSP plants will likely have as much as 15 hours of Thermal Energy Storage (TES) included in their design and operation. As such, the cost and performance of the TES system is critical to meeting the SunShot goal for solar technologies. The cost of electricity from a CSP plant depends strongly on its overall efficiency, which is a product of two components - the collection and conversion efficiencies. The collection efficiency determines the portion of incident solar energy that is captured as high-temperature thermal energy. The conversion efficiency determines the portion of thermal energy that is converted to electricity. The operating temperature at which the overall efficiency reaches its maximum depends on many factors, including material properties of the CSP plant components. Increasing the operating temperature of the power generation system leads to higher thermal-to-electric conversion efficiency. However, in a CSP system, higher operating temperature also leads to greater thermal losses. These two effects combine to give an optimal system-level operating temperature that may be less than the upper operating temperature limit of system components. The overall efficiency may be improved by developing materials, power cycles, and system-integration strategies that enable operation at elevated temperature while limiting thermal losses. This is particularly true for the TES system and its components. Meeting the SunShot cost target will require cost and performance improvements in all systems and components within a CSP plant. Solar collector field hardware will need to decrease significantly in cost with no loss in performance and possibly with performance improvements. As higher temperatures are considered for the power block, new working fluids, heat-transfer fluids (HTFs), and storage fluids will all need to be identified to meet these new operating conditions. Figure 1 shows thermodynamic conversion efficiency as a function of temperature for the ideal Carnot cycle and 75% Carnot, which is considered to be the practical efficiency attainable by current power cycles. Current conversion efficiencies for the parabolic trough steam cycle, power tower steam cycle, parabolic dish/Stirling, Ericsson, and air-Brayton/steam Rankine combined cycles are shown at their corresponding operating temperatures. Efficiencies for supercritical steam and carbon dioxide (CO{sub 2}) are also shown for their operating temperature ranges.

Glatzmaier, G.

2011-12-01T23:59:59.000Z

70

Handbook for cost estimating. A method for developing estimates of costs for generic actions for nuclear power plants  

SciTech Connect (OSTI)

This document provides overall guidance to assist the NRC in preparing the types of cost estimates required by the Regulatory Analysis Guidelines and to assist in the assignment of priorities in resolving generic safety issues. The Handbook presents an overall cost model that allows the cost analyst to develop a chronological series of activities needed to implement a specific regulatory requirement throughout all applicable commercial LWR power plants and to identify the significant cost elements for each activity. References to available cost data are provided along with rules of thumb and cost factors to assist in evaluating each cost element. A suitable code-of-accounts data base is presented to assist in organizing and aggregating costs. Rudimentary cost analysis methods are described to allow the analyst to produce a constant-dollar, lifetime cost for the requirement. A step-by-step example cost estimate is included to demonstrate the overall use of the Handbook.

Ball, J.R.; Cohen, S.; Ziegler, E.Z.

1984-10-01T23:59:59.000Z

71

Brush Busters: How to Estimate Costs for Controlling Small Mesquite  

E-Print Network [OSTI]

rapidly as plant size increases. ? Costs can escalate rapidly if you apply leaf or stem sprays using excessive pressure or nozzles with large orifices. ? Labor is usually a major component of total cost with Brush Busters methods. Costs escalate rapidly... and Figure 2 estimates costs for the stem spray method). Each figure consists of three graphs. The upper graph shows the cost for the spray only. The center graph shows total cost for spray plus labor at $6 per hour. The bottom graph shows total cost...

Ueckert, Darrell; McGinty, Allan

1999-04-15T23:59:59.000Z

72

The unit cost factors and calculation methods for decommissioning - Cost estimation of nuclear research facilities  

SciTech Connect (OSTI)

Available in abstract form only. Full text of publication follows: The uncertainties of decommissioning costs increase high due to several conditions. Decommissioning cost estimation depends on the complexity of nuclear installations, its site-specific physical and radiological inventories. Therefore, the decommissioning costs of nuclear research facilities must be estimated in accordance with the detailed sub-tasks and resources by the tasks of decommissioning activities. By selecting the classified activities and resources, costs are calculated by the items and then the total costs of all decommissioning activities are reshuffled to match with its usage and objectives. And the decommissioning cost of nuclear research facilities is calculated by applying a unit cost factor method on which classification of decommissioning works fitted with the features and specifications of decommissioning objects and establishment of composition factors are based. Decommissioning costs of nuclear research facilities are composed of labor cost, equipment and materials cost. Of these three categorical costs, the calculation of labor costs are very important because decommissioning activities mainly depend on labor force. Labor costs in decommissioning activities are calculated on the basis of working time consumed in decommissioning objects and works. The working times are figured out of unit cost factors and work difficulty factors. Finally, labor costs are figured out by using these factors as parameters of calculation. The accuracy of decommissioning cost estimation results is much higher compared to the real decommissioning works. (authors)

Kwan-Seong Jeong; Dong-Gyu Lee; Chong-Hun Jung; Kune-Woo Lee [Korea Atomic Energy Research Institute, Deokjin-dong 150, Yuseong-gu, Daejeon 305-353 (Korea, Republic of)

2007-07-01T23:59:59.000Z

73

Updated Buildings Sector Appliance and Equipment Costs and Efficiency  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500II Field Emission SEM with EDAX (For3WebinarUpdateUpdateMay

74

Brush Busters: How to Estimate Costs for Controlling Pricklypear  

E-Print Network [OSTI]

graph shows total cost for spray plus labor at $6 per hour. The bottom graph shows total cost for spray plus labor at $12 per hour. ? Locate your average plant density (the average calculated in Step #1) on the lower, horizontal axis (density axis... to the vertical axis (cost axis) on the left of the graph. Make a mark on the cost axis. This point is an estimate of what your cost per acre should be in $/acre. Example: If you have an average of 100 pricklypear plants per acre, and your labor cost is $6 per...

Ueckert, Darrell; McGinty, Allan

1999-04-15T23:59:59.000Z

75

Cost Estimation Package - DOE Directives, Delegations, and Requirement...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

components (or elements) of the cost estimation package and their documentation. g4301-1chp2.pdf -- PDF Document, 10 KB Writer: John Makepeace Subjects: ID: DOE G 430.1-1 Chp 2...

76

Use of Cost Estimating Relationships - DOE Directives, Delegations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

must be aware so the Cost Estimating Relationships can be properly used. g4301-1chp18.pdf -- PDF Document, 41 KB Writer: John Makepeace Subjects: Administration Management...

77

Estimating the Economic Costs of Espionage  

E-Print Network [OSTI]

who provided invaluable feedback through their participation in the project?s simulation. The team would also like to thank Ms. Janeen Wood, Assistant to the Department Head for International Affairs, and Ms. Rebecca Eaton, Senior Office Associate... have on U.S. corporations.”9 However, ASIS does not reveal the methodology used to establish this relationship and develop the loss estimations. Likewise, Marc Zwillinger and Christian Genetski, Adjunct Professors of Law at Georgetown University...

Bell, Rich; Bennett, J. Ethan; Boles, Jillian R.; Goodoien, David M.; Irving, Jeff W.; Kuhlman, Phillip B.; White, Amanda K.

2010-01-01T23:59:59.000Z

78

Estimating design costs for first-of-a-kind projects  

SciTech Connect (OSTI)

Modern scientific facilities are often outcomes of projects that are first-of-a-kind, that is, minimal historical data are available for project costs and schedules. However, at Fermilab, there was an opportunity to execute two similar projects consecutively. In this paper, a comparative study of the design costs for these two projects is presented using earned value methodology. This study provides some insights into how to estimate the cost of a replicated project.

Banerjee, Bakul; /Fermilab

2006-03-01T23:59:59.000Z

79

Estimating the Actual Cost of Transmission System Congestion  

E-Print Network [OSTI]

of the utility's generation, load and tie-line flows over the study time period. Due to the common lack by most be used by a utility to estimate the actual cost of congestion on its transmission system using limited interconnected grid (i.e., the Eastern Interconnect), costs for the utility's generators, and then hourly values

80

DFMA Cost Estimates of Fuel-Cell/Reformer Systems  

E-Print Network [OSTI]

Page 1 DFMA Cost Estimates of Fuel-Cell/Reformer Systems at Low/Medium/High Production Rates Brian system · Direct hydrogen fuel cell system (with 5kpsi H2 storage) 2. Determine costs for system ·Fuel cell stacks ·Air supply and humidification ·Thermal management ·Water management ·Fuel Supply

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Updated Buildings Sector Appliance and Equipment Costs and Efficiency  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteamYearTexas--StateWinterYear Jan Monthly DownloadPotential8.Updated

82

Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review  

SciTech Connect (OSTI)

This independent review is the conclusion arrived at from data collection, document reviews, interviews and deliberation from December 2010 through April 2011 and the technical potential of Hydrogen Production Cost Estimate Using Biomass Gasification. The Panel reviewed the current H2A case (Version 2.12, Case 01D) for hydrogen production via biomass gasification and identified four principal components of hydrogen levelized cost: CapEx; feedstock costs; project financing structure; efficiency/hydrogen yield. The panel reexamined the assumptions around these components and arrived at new estimates and approaches that better reflect the current technology and business environments.

Ruth, M.

2011-10-01T23:59:59.000Z

83

Fuel Cell System for Transportation -- 2005 Cost Estimate  

SciTech Connect (OSTI)

Independent review report of the methodology used by TIAX to estimate the cost of producing PEM fuel cells using 2005 cell stack technology. The U.S. Department of Energy (DOE) Hydrogen, Fuel Cells and Infrastructure Technologies Program Manager asked the National Renewable Energy Laboratory (NREL) to commission an independent review of the 2005 TIAX cost analysis for fuel cell production. The NREL Systems Integrator is responsible for conducting independent reviews of progress toward meeting the DOE Hydrogen Program (the Program) technical targets. An important technical target of the Program is the proton exchange membrane (PEM) fuel cell cost in terms of dollars per kilowatt ($/kW). The Program's Multi-Year Program Research, Development, and Demonstration Plan established $125/kW as the 2005 technical target. Over the last several years, the Program has contracted with TIAX, LLC (TIAX) to produce estimates of the high volume cost of PEM fuel cell production for transportation use. Since no manufacturer is yet producing PEM fuel cells in the quantities needed for an initial hydrogen-based transportation economy, these estimates are necessary for DOE to gauge progress toward meeting its targets. For a PEM fuel cell system configuration developed by Argonne National Laboratory, TIAX estimated the total cost to be $108/kW, based on assumptions of 500,000 units per year produced with 2005 cell stack technology, vertical integration of cell stack manufacturing, and balance-of-plant (BOP) components purchased from a supplier network. Furthermore, TIAX conducted a Monte Carlo analysis by varying ten key parameters over a wide range of values and estimated with 98% certainty that the mean PEM fuel cell system cost would be below DOE's 2005 target of $125/kW. NREL commissioned DJW TECHNOLOGY, LLC to form an Independent Review Team (the Team) of industry fuel cell experts and to evaluate the cost estimation process and the results reported by TIAX. The results of this independent review will permit NREL and DOE to better understand the credibility of the TIAX cost estimation process and to implement changes in future cost analyses, if necessary. The Team found the methodology used by TIAX to estimate the cost of producing PEM fuel cells to be reasonable and, using 2005 cell stack technology and assuming production of 500,000 units per year, to have calculated a credible cost of $108/kW.

Wheeler, D.

2006-10-01T23:59:59.000Z

84

Detailed cost estimate of reference residential photovoltaic designs  

SciTech Connect (OSTI)

This report presents estimated installation costs for four reference residential photovoltaic designs. Installation cost estimates ranged from $1.28 to $2.12/W/sub p/ for arrays installed by union labor (4.1 to 6.07 kW/sub p/-systems), and from $1.22 to $1.83 W/sub p/ for non-union installations. Standoff mounting was found to increase costs from $1.63/W/sub p/ to $2.12/W/sub p/ for a representative case, whereas 25 kWh of battery storage capacity increased installation costs from $1.44/W/sub p/ to $2.08/W/sub p/. Overall system costs (union-based were $6000 to $7000 for a 4.1 kW array in the northeast, to approx. $9000 for a 6.07 kW/sub p/ array in the southwest. This range of installation costs, approx. $1 to $2/W/sub p/ (in 1980 dollars), is representative of current installation costs for residential PV systems. Any future cost reductions are likely to be small and can be accomplished only by optimization of mounting techniques, module efficiencies, and module reliability in toto.

Palmer, R.S.; Penasa, D.A.; Thomas, M.G.

1983-04-01T23:59:59.000Z

85

Eects of eye position on estimates of eye displacement for spatial updating  

E-Print Network [OSTI]

E¡ects of eye position on estimates of eye displacement for spatial updating Masaki Tanaka cortex represent spatial memory of visual stimuli in an eye-centered coordinate frame. To preserve spatial stability across eye movements, spatial memory must be updated during each eye movement. Because

Crawford, Doug

86

Updated Costs (June 2011 Basis) for Selected Bituminous Baseline Cases  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500II Field Emission SEM with EDAXUpdated Capital Cost

87

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Broader source: Energy.gov (indexed) [DOE]

Application Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Application This report estimates fuel cell system cost for systems produced in the...

88

Additional Resources for Estimating Building Energy and Cost Savings to Reduce Greenhouse Gases  

Broader source: Energy.gov [DOE]

For evaluating greenhouse gas reduction strategies and estimating costs, the following information resources can help Federal agencies estimate energy and cost savings potential by building type.

89

ELECTRICITY CASE: ECONOMIC COST ESTIMATION FACTORS FOR ECONOMIC  

E-Print Network [OSTI]

ELECTRICITY CASE: ECONOMIC COST ESTIMATION FACTORS FOR ECONOMIC ASSESSMENT OF TERRORIST ATTACKS Zimmerman, R. CREATE REPORT Under FEMA Grant EMW-2004-GR-0112 May 31, 2005 Center for Risk and Economic #12;2 Abstract The major economic effects of electric power outages are usually associated with three

Wang, Hai

90

Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive Applications: Fuel Cell Tech Team Review  

Broader source: Energy.gov [DOE]

This presentation reports on direct hydrogen PEMFC manufacturing cost estimation for automotive applications.

91

A SURVEY OF STATE-LEVEL COST ESTIMATES OF RENEWABLES PORTFOLIO STANDARDS  

E-Print Network [OSTI]

LEVEL COST ESTIMATES OF RENEWABLES PORTFOLIO STANDARDS Galenthe incremental cost of renewables portfolio standards (RPS)Washington DC have adopted renewables portfolio standards (

Barbose, Galen

2014-01-01T23:59:59.000Z

92

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Application Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Application This presentation reports on the status of mass production cost...

93

Cost Estimation and Production Evaluation for Hopper Dredges  

E-Print Network [OSTI]

1848g3040g2879g3014 (7) where fg2933 is the Moody friction factor for water flow, g is gravitational acceleration in m/sec2 (ft/sec2), D is the inner diameter of the pipe in meters (ft), Vg2923 is the mean velocity of the mixture (m/s), Sg2929... COST ESTIMATION AND PRODUCTION EVALUATION FOR HOPPER DREDGES A Thesis by THOMAS ELLIOT HOLLINBERGER Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree...

Hollinberger, Thomas E.

2010-07-14T23:59:59.000Z

94

Property:EstimatedCostLowUSD | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExploration Jump to: navigation, search PropertyEstimatedCostLowUSD Jump to:

95

Property:EstimatedCostMedianUSD | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExploration Jump to: navigation, search PropertyEstimatedCostLowUSD Jump

96

Develpment of a low Cost Method to Estimate the Seismic Signiture...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Develpment of a low Cost Method to Estimate the Seismic Signiture of a Geothemal Field from Ambient Seismic Noise Analysis Develpment of a low Cost Method to Estimate the Seismic...

97

Identification of potential strategies, methods, and tools for improving cost estimating practices for highway projects  

E-Print Network [OSTI]

Project cost escalation is a major problem for State Highway Agencies (SHA). This problem is evident in cost estimating procedures that may not promote consistency and accuracy of costs over the project development process. The research proposes...

Donnell, Kelly Elaine

2005-08-29T23:59:59.000Z

98

E-Print Network 3.0 - approximate cost estimating Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Die-cost... with high configurability have been discontinued 12;10 Contributions 1. Cost Model to Estimate Die-cost... for Structured ASICs 12;11 Contributions 1. ... Source:...

99

COBRA: A Hybrid Method for Software Cost Estimation, Benchmarking, and Risk Assessment  

E-Print Network [OSTI]

COBRA: A Hybrid Method for Software Cost Estimation, Benchmarking, and Risk Assessment approaches (referred to as COBRA, COst estimation, Benchmarking, and Risk Assessment). We find through a case accurate and reliable cost estimates to allocate and control project resources, and to make realistic bids

Briand, Lionel C.

100

Interdisciplinary Institute for Innovation Estimating the costs of nuclear  

E-Print Network [OSTI]

on this topic is fairly confusing. Some present electricity production using nuclear power as an affordable of costs and draw a distinction between a private cost and a social cost. The private cost is what evaluating the costs it is impossible to establish the cost price, required to compare electricity production

Paris-Sud XI, Université de

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Update on the environmental and economic costs associated with alien-invasive species in the United States  

E-Print Network [OSTI]

Update on the environmental and economic costs associated with alien-invasive species in the United University, Ithaca, NY 14850-0901, United States Available online 29 December 2004 Abstract Invading alien% of the species on the Threatened or Endangered species lists are at risk primarily because of alien

Schweik, Charles M.

102

An Experiment to Improve Cost Estimation and Project Tracking for Software and Systems Integration Projects  

E-Print Network [OSTI]

An Experiment to Improve Cost Estimation and Project Tracking for Software and Systems Integration to improve cost estimation and project tracking. 1. Introduction In order to remain competitive, ICL (as well for integration projects, to reduce time to market and to reduce costs without detriment to the quality

Henderson, Peter

103

Data Collection and Normalization for the Development of Cost Estimating Relationships  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Cost estimating relationships or parametric equations are mathematical statements that indicate that the cost is proportional to a physical commodity. Parametric estimating requires that the statistical analysis be performed on data points to correlate the cost drivers and other system parameters. This chapter discusses considerations for data collection and normalization.

1997-03-28T23:59:59.000Z

104

Estimating the economic cost of sea-level rise Masahiro Sugiyama  

E-Print Network [OSTI]

Estimating the economic cost of sea-level rise by Masahiro Sugiyama Bachelor of Science in Earth To improve the estimate of economic costs of future sea-level rise associated with global climate change, the thesis generalizes the sea-level rise cost function originally proposed by Fankhauser, and applies

105

Estimating the manufacturing cost of purely organic solar cells Joseph Kalowekamo 1  

E-Print Network [OSTI]

to a levelized cost of electricity (LEC) of between 49˘ and 85˘/kWh. In order to achieve a more competitive COE that into a levelized electricity cost (LEC). We find that there is a great deal of uncertainty about the capital costs., Estimating the manufacturing cost of purely organic solar cells, Sol. Energy (2009), doi:10.1016/j

Massachusetts at Amherst, University of

106

IDC Reengineering Phase 2 & 3 Rough Order of Magnitude (ROM) Cost Estimate Summary (Leveraged NDC Case).  

SciTech Connect (OSTI)

Sandia National Laboratories has prepared a ROM cost estimate for budgetary planning for the IDC Reengineering Phase 2 & 3 effort, based on leveraging a fully funded, Sandia executed NDC Modernization project. This report provides the ROM cost estimate and describes the methodology, assumptions, and cost model details used to create the ROM cost estimate. ROM Cost Estimate Disclaimer Contained herein is a Rough Order of Magnitude (ROM) cost estimate that has been provided to enable initial planning for this proposed project. This ROM cost estimate is submitted to facilitate informal discussions in relation to this project and is NOT intended to commit Sandia National Laboratories (Sandia) or its resources. Furthermore, as a Federally Funded Research and Development Center (FFRDC), Sandia must be compliant with the Anti-Deficiency Act and operate on a full-cost recovery basis. Therefore, while Sandia, in conjunction with the Sponsor, will use best judgment to execute work and to address the highest risks and most important issues in order to effectively manage within cost constraints, this ROM estimate and any subsequent approved cost estimates are on a 'full-cost recovery' basis. Thus, work can neither commence nor continue unless adequate funding has been accepted and certified by DOE.

Harris, James M.; Prescott, Ryan; Dawson, Jericah M.; Huelskamp, Robert M.

2014-11-01T23:59:59.000Z

107

Feature-based investment cost estimation based on modular design of a continuous pharmaceutical manufacturing system  

E-Print Network [OSTI]

Previous studies of continuous manufacturing processes have used equipment-factored cost estimation methods to predict savings in initial plant investment costs. In order to challenge and validate the existing methods of ...

Collins, Donovan (Donovan Scott)

2011-01-01T23:59:59.000Z

108

Los Alamos Waste Management Cost Estimation Model; Final report: Documentation of waste management process, development of Cost Estimation Model, and model reference manual  

SciTech Connect (OSTI)

This final report completes the Los Alamos Waste Management Cost Estimation Project, and includes the documentation of the waste management processes at Los Alamos National Laboratory (LANL) for hazardous, mixed, low-level radioactive solid and transuranic waste, development of the cost estimation model and a user reference manual. The ultimate goal of this effort was to develop an estimate of the life cycle costs for the aforementioned waste types. The Cost Estimation Model is a tool that can be used to calculate the costs of waste management at LANL for the aforementioned waste types, under several different scenarios. Each waste category at LANL is managed in a separate fashion, according to Department of Energy requirements and state and federal regulations. The cost of the waste management process for each waste category has not previously been well documented. In particular, the costs associated with the handling, treatment and storage of the waste have not been well understood. It is anticipated that greater knowledge of these costs will encourage waste generators at the Laboratory to apply waste minimization techniques to current operations. Expected benefits of waste minimization are a reduction in waste volume, decrease in liability and lower waste management costs.

Matysiak, L.M.; Burns, M.L.

1994-03-01T23:59:59.000Z

109

Estimating Administrative and Procedural Costs Natural Resource Restoration Settlements  

E-Print Network [OSTI]

assessment costs incurred by natural resource trustee agencies (i.e., the federal, state, Indian tribe, and, trustee costs #12;The goal of natural resource damage assessment actions undertaken subsequent to the trustees, or some combination thereof. The damage assessment costs incurred by the natural resource

110

An activity-based-parametric hybrid cost model to estimate the unit cost of a novel gas turbine component  

E-Print Network [OSTI]

An activity-based-parametric hybrid cost model to estimate the unit cost of a novel gas turbine in gas turbine compressors. However, the model disc (blisk) designs which are used by the aerospace industry in gas turbine compressors. The tool

Sóbester, András

111

User's manual for the INDCEPT code for estimating industrial steam boiler plant capital investment costs  

SciTech Connect (OSTI)

The INDCEPT computer code package was developed to provide conceptual capital investment cost estimates for single- and multiple-unit industrial steam boiler plants. Cost estimates can be made as a function of boiler type, size, location, and date of initial operation. The output includes a detailed breakdown of the estimate into direct and indirect costs. Boiler plant cost models are provided to reflect various types and sources of coal and alternate means of sulfur and particulate removal. Cost models are also included for low-Btu and medium-Btu gas produced in coal gasification plants.

Bowers, H I; Fuller, L C; Hudson, II, C R

1982-09-01T23:59:59.000Z

112

The Essentials of Preparing Cost Estimates Yielding Long-Run Profitability  

E-Print Network [OSTI]

appropriately. The five primary cost estimating methods are:(Garrett 2008) 1. Analogy Method: This approach is based on using historical data from similar projects in the past. The advantages of using this method are that it can be used early in project... (WBS) and includes all overhead and fees added to material cost and labor hours. Essentials of Winning Cost Estimates Cost estimating is an inexact practice, a blend of art and science and, therefore, full of risk.(Garrett 2008) Yet an estimate...

Khan, Sadia

2010-05-14T23:59:59.000Z

113

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Services & Testing Contract September 2014 Contractor: Contract Number: Contract Type: Advanced Technologies & Labs International Inc. DE-AC27-10RV15051 Cost Plus Award Fee...

114

Brush Busters: How to Estimate Costs for Controlling Small Cedar  

E-Print Network [OSTI]

method. Figure 3 is for the top-removal method). In Figures 1 and 2, the upper graph shows the cost for the spray only. The center graph shows total cost for spray + labor at $6 per hour. The bottom graph shows total cost for spray + labor at $12 per... hour. Figure 3 shows the costs for the top-removal method, with labor at $6 per hour in the upper graph and $12 per hour in the lower graph. ? Locate your average cedar density (the average calculated in Step #1) on the lower, horizontal axis (density...

Ueckert, Darrell; McGinty, Allan

2001-04-25T23:59:59.000Z

115

Estimation and Analysis of Life Cycle Costs of Baseline Enhanced...  

Open Energy Info (EERE)

curves for key cost components - Identification of economic, environmental, and efficiency benefits of IGCC-EGS configurations - Development of skills and capabilities in...

116

FIRE Vacuum Vessel Cost estimate and R&D needs  

E-Print Network [OSTI]

primary shell and port cost est. Includes: Torus shell · Internal shielding · Active coils · Passive for: - Octant - Midplane port - Aux port - Vertical port - Active coil segment - IB passive plate Does not include: · Internal hdwe supports cost category hours $k hours $k In-house design 24680 2468 7380 738 R

117

UNIVERSITY of CALIFORNIA ATTITUDE ESTIMATION FOR A LOW-COST UAV  

E-Print Network [OSTI]

UNIVERSITY of CALIFORNIA SANTA CRUZ ATTITUDE ESTIMATION FOR A LOW-COST UAV A thesis submitted of Physics #12;Copyright c by Gregory M. Horn 2009 #12;Abstract Attitude Estimation for a Low-Cost UAV by Gregory M. Horn Unmanned Aerial Vehicles (UAVs) and Micro Aerial Vehicles (MAVs) are a rapidly growing

Belanger, David P.

118

5-4079-01-P1 RIGHT-OF-WAY COST ESTIMATING TOOL  

E-Print Network [OSTI]

5-4079-01-P1 RIGHT-OF-WAY COST ESTIMATING TOOL USER MANUAL Authors: Dr. Kara Kockelman, R.S. Dr Acquisition Cost Estimating Planning Tool AUGUST 2006 Performing Organization: Center for Transportation and the Federal Highway Administration. #12;#12;1 Tool Introduction This document is the user manual for the Right

Texas at Austin, University of

119

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for  

E-Print Network [OSTI]

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications number of vehicles it represents, DOE has established detailed cost targets for automotive fuel cell and track the cost of automotive fuel cell systems as progress is made in fuel cell technology. The purpose

120

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for  

E-Print Network [OSTI]

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications for transportation. Fuel cell systems will have to be cost-competitive with conventional and advanced vehicle it represents, the DOE has established detailed cost targets for automotive fuel cell systems and components

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Office - Oak Ridge, TN Contract Name: Transuranic Waste Processing Contract Sep-14 2,433,940 Cost Plus Award Fee 150,664,017 Fee Information Minimum Fee 2,039,246 Maximum Fee...

122

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

LLC (UCOR) DE-SC-0004645 April 29, 2011 - July 13, 2016 Contract Number: Maximum Fee Cost Plus Award Fee 1,640,839,964 Fee Information Minimum Fee 0 EM Contractor Fee Site:...

123

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

FY2011 FY2012 Fee Information Minimum Fee Maximum Fee September 2014 Contract Number: Cost Plus Incentive Fee Contractor: 3,260,603,765 Contract Period: EM Contractor Fee Site:...

124

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Wastren-EnergX Mission Support LLC Contract Number: DE-CI0000004 Contract Type: Cost Plus Award Fee 128,879,762 Contract Period: December 2009 - July 2015 Fee Information...

125

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

- September 2015 September 2014 Contractor: Contract Number: Contract Type: Idaho Treatment Group LLC DE-EM0001467 Cost Plus Award Fee Fee Information 444,161,295 Contract Period:...

126

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Cumulative Fee Paid 22,200,285 Wackenhut Services, Inc. DE-AC30-10CC60025 Contractor: Cost Plus Award Fee 989,000,000 Contract Period: Contract Type: January 2010 - December...

127

Total Estimated Contract Cost:) Performance Period Total Fee...  

Office of Environmental Management (EM)

Washington Closure LLC DE-AC06-05RL14655 Contractor: Contract Number: Contract Type: Cost Plus Incentive Fee 2,366,753,325 Fee Information 0 Maximum Fee 319,511,699...

128

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Number: Contract Type: Contract Period: 0 Minimum Fee Maximum Fee Washington River Protection Solutions LLC DE-AC27-08RV14800 Cost Plus Award Fee 5,553,789,617 Fee Information...

129

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

& Wilcox Conversion Services, LLC Contract Number: DE-AC30-11CC40015 Contract Type: Cost Plus Award Fee Fee Available 4,324,912 408,822,369 Contract Period: December 2010 -...

130

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

0 Contractor: Bechtel National Inc. Contract Number: DE-AC27-01RV14136 Contract Type: Cost Plus Award Fee Maximum Fee* 595,123,540 Fee Available 102,622,325 10,714,819,974...

131

Estimating the economic cost of sea-level rise  

E-Print Network [OSTI]

(cont.) In the case of a classical linear sea-level rise of one meter per century, the use of DIVA generally decreases the protection fraction of the coastline, and results in a smaller protection cost because of high ...

Sugiyama, Masahiro, Ph. D. Massachusetts Institute of Technology

2007-01-01T23:59:59.000Z

132

Equipment balancing and cost estimating a computer approach  

E-Print Network [OSTI]

Selection(13. 4) REM Selection (13. 4) = Selection (Capacity. Iieneuver, Lode, No. of Dozers) FOR Q=1 TO 13 FOR R=l TO 4 29 READ Selection(Q, R) SolutionScraper (Q, R) = Selection(Q. R) DATA 11, 0. 7, 0. 9, 0, 16, 0. 7, 0. 9. 0, 20. 0. 7. 0. 7. 1. 22... Cos(Scraper(53, 4) FOR I = I T09 READ CostDozer g(l) NEXT I FOR I I T09 FORJ=I T03 READ CostDozer(I J) NEXT J CostDozer(l, 4) = CostDozer(l, 2) NEXT I DATA D38 . D4E . DSB . 06D DATA 07G, 07H, DBL . 09L, D I IN DATA 7, 10, 17, 10, 13. 20...

Cottrell, David Sherman

1987-01-01T23:59:59.000Z

133

Examples of Cost Estimation Packages - DOE Directives, Delegations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1997 CRD: No DNFSB: No Related History Exemptions Standards Related to: DOE G 430.1-1 Chp 9, Operating Costs DOE G 430.1-1 Chp 19, Data Collection and Normalization for the...

134

Life Cycle Cost Estimate - DOE Directives, Delegations, and Requiremen...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

chapter discusses life cycle costs and the role they play in planning. g4301-1chp23.pdf -- PDF Document, 52 KB Writer: John Makepeace Subjects: Administration Management...

135

Cost Estimating Guide, Table of Contents - DOE Directives, Delegations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1997 CRD: No DNFSB: No Related History Exemptions Standards Related to: DOE G 430.1-1 Chp 9, Operating Costs DOE G 430.1-1 Chp 19, Data Collection and Normalization for the...

136

Oxygenation cost estimates for Cherokee, Douglas, and Norris reservoirs  

SciTech Connect (OSTI)

The capital and annual costs associated with reoxygenation of the turbine releases at Cherokee, Douglas and Norris Reservoirs using the small bubble injection technique developed for Ft. Patrick Henry Dam were computed. The weekly average dissolved oxygen (DO) deficits were computed for each reservoir for an average year (based on 16 years of records). The total annual cost of an oxygen supply and injection system for each reservoir is presented. 5 refs., 6 figs., 5 tabs.

Fain, T.G.

1980-10-01T23:59:59.000Z

137

Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500II Field Emission SEM with EDAX (For3WebinarUpdate on

138

Comparative Analysis of the Cost Models Used for Estimating Renovation Costs of Universities in Texas  

E-Print Network [OSTI]

the cost of renovation, ease of use and speed of the model are some of the other factors that practitioners look for in a cost model (Yokum and Armstrong. 1995). This research aims to identify the merits and demerits of the cost models based on not only... Researchers believe that accuracy is the main criterion for selecting the best cost model; however, a survey done by Yokum and Armstrong in 1995 shows that ease of interpretation, ease of use, ease in getting data, credibility, and speed top the list...

Faquih, Yaquta Fakhruddin

2010-10-12T23:59:59.000Z

139

Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV  

SciTech Connect (OSTI)

This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network.

NONE

1995-01-01T23:59:59.000Z

140

Update of identification and estimation of socioeconomic impacts resulting from perceived risks and changing images: An annotated bibliography  

SciTech Connect (OSTI)

This annotated bibliography reviews selected literature published through August 1991 on the identification of perceived risks and methods for estimating the economic impacts of risk perception. It updates the literature review found in Argonne National Laboratory report ANL/EAIS/TM-24 (February 1990). Included in this update are (1) a literature review of the risk perception process, of the relationship between risk perception and economic impacts, of economic methods and empirical applications, and interregional market interactions and adjustments; (2) a working bibliography (that includes the documents abstracted in the 1990 report); (3) a topical index to the abstracts found in both reports; and (4) abstracts of selected articles found in this update.

Nieves, L.A.; Clark, D.E.; Wernette, D.

1991-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Off-Highway Gasoline Consuption Estimation Models Used in the Federal Highway Administration Attribution Process: 2008 Updates  

SciTech Connect (OSTI)

This report is designed to document the analysis process and estimation models currently used by the Federal Highway Administration (FHWA) to estimate the off-highway gasoline consumption and public sector fuel consumption. An overview of the entire FHWA attribution process is provided along with specifics related to the latest update (2008) on the Off-Highway Gasoline Use Model and the Public Use of Gasoline Model. The Off-Highway Gasoline Use Model is made up of five individual modules, one for each of the off-highway categories: agricultural, industrial and commercial, construction, aviation, and marine. This 2008 update of the off-highway models was the second major update (the first model update was conducted during 2002-2003) after they were originally developed in mid-1990. The agricultural model methodology, specifically, underwent a significant revision because of changes in data availability since 2003. Some revision to the model was necessary due to removal of certain data elements used in the original estimation method. The revised agricultural model also made use of some newly available information, published by the data source agency in recent years. The other model methodologies were not drastically changed, though many data elements were updated to improve the accuracy of these models. Note that components in the Public Use of Gasoline Model were not updated in 2008. A major challenge in updating estimation methods applied by the public-use model is that they would have to rely on significant new data collection efforts. In addition, due to resource limitation, several components of the models (both off-highway and public-us models) that utilized regression modeling approaches were not recalibrated under the 2008 study. An investigation of the Environmental Protection Agency's NONROAD2005 model was also carried out under the 2008 model update. Results generated from the NONROAD2005 model were analyzed, examined, and compared, to the extent that is possible on the overall totals, to the current FHWA estimates. Because NONROAD2005 model was designed for emission estimation purposes (i.e., not for measuring fuel consumption), it covers different equipment populations from those the FHWA models were based on. Thus, a direct comparison generally was not possible in most sectors. As a result, NONROAD2005 data were not used in the 2008 update of the FHWA off-highway models. The quality of fuel use estimates directly affect the data quality in many tables published in the Highway Statistics. Although updates have been made to the Off-Highway Gasoline Use Model and the Public Use Gasoline Model, some challenges remain due to aging model equations and discontinuation of data sources.

Hwang, Ho-Ling [ORNL; Davis, Stacy Cagle [ORNL

2009-12-01T23:59:59.000Z

142

Survey of State-Level Cost and Benefit Estimates of Renewable Portfolio Standards  

SciTech Connect (OSTI)

Most renewable portfolio standards (RPS) have five or more years of implementation experience, enabling an assessment of their costs and benefits. Understanding RPS costs and benefits is essential for policymakers evaluating existing RPS policies, assessing the need for modifications, and considering new policies. This study provides an overview of methods used to estimate RPS compliance costs and benefits, based on available data and estimates issued by utilities and regulators. Over the 2010-2012 period, average incremental RPS compliance costs in the United States were equivalent to 0.8% of retail electricity rates, although substantial variation exists around this average, both from year-to-year and across states. The methods used by utilities and regulators to estimate incremental compliance costs vary considerably from state to state and a number of states are currently engaged in processes to refine and standardize their approaches to RPS cost calculation. The report finds that state assessments of RPS benefits have most commonly attempted to quantitatively assess avoided emissions and human health benefits, economic development impacts, and wholesale electricity price savings. Compared to the summary of RPS costs, the summary of RPS benefits is more limited, as relatively few states have undertaken detailed benefits estimates, and then only for a few types of potential policy impacts. In some cases, the same impacts may be captured in the assessment of incremental costs. For these reasons, and because methodologies and level of rigor vary widely, direct comparisons between the estimates of benefits and costs are challenging.

Heeter, J.; Barbose, G.; Bird, L.; Weaver, S.; Flores-Espino, F.; Kuskova-Burns, K.; Wiser, R.

2014-05-01T23:59:59.000Z

143

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Fee Paid 127,390,991 Contract Number: Fee Available Contract Period: Contract Type: Cost Plus Award Fee 4,104,318,749 28,500,000 31,597,837 0 39,171,018 32,871,600 EM...

144

Uncertainty Quantification and Calibration in Well Construction Cost Estimates  

E-Print Network [OSTI]

EXCEPT tubulars -Intercoms -Forklift (if kept on location) -Packer & retrievable bridge plug - PVT?s monitoring equipment -Circulating pump (for reserve pit) -Pick up lay down machines -All casing crews...) -Thread man to witness torque make up on tubular goods Environmental & Safety -Trash trailer & cost to dispose of contents -Chemical toilets -Lining, fencing, filling in reserve pits -Sound abatement...

Valdes Machado, Alejandro

2013-08-05T23:59:59.000Z

145

ERCB updates estimated reserves of crude bitumen and synthetic crude oil  

SciTech Connect (OSTI)

The Alberta Energy Resources Conservation Board prepares yearly updates of Alberta reserves of crude bitumen and synthetic crude oil. The latest figures are as of the end of 1985. Alberta's crude bitumen reserves are contained in designated deposits with the oil sand areas of Athabasca, Cold Lake, and Peace River. The total initial volume of crude bitumen in-place for the designated deposits at December 31, 1985 was estimated as 266.4 billion cubic meters. Within the potentially mineable areas, the initial mineable volume in-place of crude bitumen was established to be 11.9 billion cubic meters. After allowing for surface facilities (plant sites, tailings ponds, discard dumps), environmental protection corridors along major rivers, isolated mineable areas, and assuming a combined mining/extraction recovery factor of 0.78, the resulting initial established mineable reserve of crude bitumen is estimated to be 5.2 billion cubic meters. Data are presented in three tables.

Not Available

1986-09-01T23:59:59.000Z

146

GAO Cost Estimating and Assessment Guide | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecember 2005DepartmentDecember U.S.FinancialofFuel CycleDepartmentG. BrianCost

147

Cost Estimating Guide - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases on γ-Al2O3. |ID#: 19834 Title: CorrelationCostCURRENT

148

Estimating the Market Penetration of Residential Cool Storage Technology Using Economic Cost Modeling  

E-Print Network [OSTI]

This study estimated the market penetration for residential cool storage technology using economic cost modeling. Residential cool storage units produce and store chill during off-peak periods of the day to be used during times of peak electric...

Weijo, R. O.; and Brown, D. R.

1988-01-01T23:59:59.000Z

149

Estimate Costs to Implement Greenhouse Gas Mitigation Strategies for Employee Commuting  

Broader source: Energy.gov [DOE]

For greenhouse gas (GHG) mitigation, once a Federal agency identifies the employee commute alternatives and supporting strategies that will most effectively reduce trips to the worksite, costs of encouraging adoption of those methods can be estimated.

150

Schedule and cost estimate for an innovative Boston Harbor concert hall  

E-Print Network [OSTI]

This thesis formulates a cost estimate and schedule for constructing the Boston Concert Hall, an innovative hypothetical building composed of two concert halls and a restaurant. Concert Halls are complex and expensive ...

Coste, Amelie, 1982-

2004-01-01T23:59:59.000Z

151

The estimated costs of corn, corn silage, soybeans, alfalfa, and pasture maintenance in this report are  

E-Print Network [OSTI]

The estimated costs of corn, corn silage, soybeans, alfalfa, and pasture maintenance in this report significantly over time. Budgets for alfalfa hay establishment with an oat companion crop and by direct seeding are included in this publication. Annual production costs for established alfalfa or alfalfa-grass hay as well

Duffy, Michael D.

152

A Growing and Costly Issue An estimated 1.8 million adult Texans have been  

E-Print Network [OSTI]

A Growing and Costly Issue An estimated 1.8 million adult Texans have been diagnosed with diabetes, while the diabetes in another 460,000 remains undiagnosed. The annual cost of diabetes in Texas's Response Diabetes is not curable, but it is manageable. People can learn skills to effectively manage

153

A Growing and Costly Issue An estimated 1.8 million adult Texans have been  

E-Print Network [OSTI]

A Growing and Costly Issue An estimated 1.8 million adult Texans have been diagnosed with diabetes, while the diabetes of another 460,000 remains undiagnosed. The annual cost of diabetes in Texas's Response Diabetes is not curable, but it is manageable. People can learn skills to effectively manage

154

Implementation of DOE/NFDI D&D Cost Estimating Tool (POWERtool) for Initiative Facilities at the Savannah River Site  

SciTech Connect (OSTI)

The Savannah River Site (SRS) has embarked on an aggressive D&D program to reduce the footprint of excess facilities. Key to the success of this effort is the preparation of accurate cost estimates for decommissioning. SRS traditionally uses ''top-down'' rough order-of-magnitude (ROM) estimating for decommissioning cost estimates. A second cost estimating method (POWERtool) using a ''bottoms-up'' approach has been applied to many of the SRS excess facilities in the T and D-area. This paper describes the use of both estimating methods and compares the estimated costs to actual costs of 5 facilities that were decommissioned in 2002.

Austin, W. E.; WSRC; Baker, S. B. III, Cutshall, C. M.; Crouse, J. L.

2003-02-26T23:59:59.000Z

155

Microsoft PowerPoint - Cost Estimating for Hydro Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces andMapping theEnergyInnovationMichaelGE1PlanARMAqueous two-phase7Estimating

156

An analysis of nuclear power plant operating costs: A 1995 update  

SciTech Connect (OSTI)

Over the years real (inflation-adjusted) O&M cost have begun to level off. The objective of this report is to determine whether the industry and NRC initiatives to control costs have resulted in this moderation in the growth of O&M costs. Because the industry agrees that the control of O&M costs is crucial to the viability of the technology, an examination of the factors causing the moderation in costs is important. A related issue deals with projecting nuclear operating costs into the future. Because of the escalation in nuclear operating costs (and the fall in fossil fuel prices) many State and Federal regulatory commissions are examining the economics of the continued operation of nuclear power plants under their jurisdiction. The economics of the continued operation of a nuclear power plant is typically examined by comparing the cost of the plants continued operation with the cost of obtaining the power from other sources. This assessment requires plant-specific projections of nuclear operating costs. Analysts preparing these projections look at past industry-wide cost trends and consider whether these trends are likely to continue. To determine whether these changes in trends will continue into the future, information about the causal factors influencing costs and the future trends in these factors are needed. An analysis of the factors explaining the moderation in cost growth will also yield important insights into the question of whether these trends will continue.

NONE

1995-04-21T23:59:59.000Z

157

Review of cost estimates for reducing CO2 emissions. Final report, Task 9  

SciTech Connect (OSTI)

Since the ground breaking work of William Nordhaus in 1977, cost estimates for reducing CO{sub 2} emissions have been developed by numerous groups. The various studies have reported sometimes widely divergent cost estimates for reducing CO{sub 2} emissions. Some recent analyses have indicated that large reductions in CO{sub 2} emissions could be achieved at zero or negative costs (e.g. Rocky Mountain Institute 1989). In contrast, a recent study by Alan Manne of Stanford and Richard Richels of the Electric Power Research Institute (Manne-Richels 1989) concluded that in the US the total discounted costs of reducing CO{sub 2} emissions by 20 percent below the 1990 level could be as much as 3.6 trillion dollars over the period from 1990 to 2100. Costs of this order of magnitude would represent about 5 percent of US GNP. The purpose of this briefing paper is to summarize the different cost estimates for CO{sub 2} emission reduction and to identify the key issues and assumptions that underlie these cost estimates.

Not Available

1990-10-01T23:59:59.000Z

158

Updated Analysis of Energy and cost Savings for Utility service Program at Federal Sites  

SciTech Connect (OSTI)

Report detailing PNNL's re-analysis of data based original analysis done in 2004. The data came from the updated Department of Energy Federal Energy Management utility energy services contract database and the analysis was also expanded to uncover information on additional areas.

Mcmordie, Katherine; Sandusky, William F.; Solana, Amy E.; Bates, Derrick J.

2006-10-31T23:59:59.000Z

159

LIFE CYCLE COST HANDBOOK Guidance for Life Cycle Cost Estimation and Analysis  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergy Health andofIanJennifer SomersKnown ChallengesLES'LIFE CYCLE COST HANDBOOK

160

Cost estimates for near-term depolyment of advanced traffic management systems. Final report  

SciTech Connect (OSTI)

The objective of this study is to provide cost est engineering, design, installation, operation and maintenance of Advanced Traffic Management Systems (ATMS) in the largest 75 metropolitan areas in the United States. This report gives estimates for deployment costs for ATMS in the next five years, subject to the qualifications and caveats set out in following paragraphs. The report considers infrastructure components required to realize fully a functional ATMS over each of two highway networks (as discussed in the Section describing our general assumptions) under each of the four architectures identified in the MITRE Intelligent Vehicle Highway Systems (IVHS) Architecture studies. The architectures are summarized in this report in Table 2. Estimates are given for eight combinations of highway networks and architectures. We estimate that it will cost between $8.5 Billion (minimal network) and $26 Billion (augmented network) to proceed immediately with deployment of ATMS in the largest 75 metropolitan areas. Costs are given in 1992 dollars, and are not adjusted for future inflation. Our estimates are based partially on completed project costs, which have been adjusted to 1992 dollars. We assume that a particular architecture will be chosen; projected costs are broken by architecture.

Stevens, S.S.; Chin, S.M.

1993-02-15T23:59:59.000Z

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Estimated costs of ventilation systems complying with the HUD ventilation standard for manufactured homes  

SciTech Connect (OSTI)

At the request of the US Department of Housing and Urban Development (HUD), the Pacific Northwest Laboratory estimated the material, labor, and operating costs for ventilation equipment needed for compliance with HUD`s proposed revision to the ventilation standard for manufactured housing. This was intended to bound the financial impacts of the ventilation standard revision. Researchers evaluated five possible prototype ventilation systems that met the proposed ventilation requirements. Of those five, two systems were determined to be the most likely used by housing manufacturers: System 1 combines a fresh air duct with the existing central forced-air system to supply and circulate fresh air to conditioned spaces. System 2 uses a separate exhaust fan to remove air from the manufactured home. The estimated material and labor costs for these two systems range from $200 to $300 per home. Annual operating costs for the two ventilation systems were estimated for 20 US cities. The estimated operating costs for System 1 ranged from $55/year in Las Vegas, Nevada, to $83/year in Bismarck, North Dakota. Operating costs for System 2 ranged from a low of $35/year in Las Vegas to $63/year in Bismarck. Thus, HUD`s proposed increase in ventilation requirements will add less than $100/year to the energy cost of a manufactured home.

Miller, J.D.; Conner, C.C.

1993-11-01T23:59:59.000Z

162

Startup Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter discusses startup costs for construction and environmental projects, and estimating guidance for startup costs.

1997-03-28T23:59:59.000Z

163

Site restoration: Estimation of attributable costs from plutonium-dispersal accidents  

SciTech Connect (OSTI)

A nuclear weapons accident is an extremely unlikely event due to the extensive care taken in operations. However, under some hypothetical accident conditions, plutonium might be dispersed to the environment. This would result in costs being incurred by the government to remediate the site and compensate for losses. This study is a multi-disciplinary evaluation of the potential scope of the post-accident response that includes technical factors, current and proposed legal requirements and constraints, as well as social/political factors that could influence decision making. The study provides parameters that can be used to assess economic costs for accidents postulated to occur in urban areas, Midwest farmland, Western rangeland, and forest. Per-area remediation costs have been estimated, using industry-standard methods, for both expedited and extended remediation. Expedited remediation costs have been evaluated for highways, airports, and urban areas. Extended remediation costs have been evaluated for all land uses except highways and airports. The inclusion of cost estimates in risk assessments, together with the conventional estimation of doses and health effects, allows a fuller understanding of the post-accident environment. The insights obtained can be used to minimize economic risks by evaluation of operational and design alternatives, and through development of improved capabilities for accident response.

Chanin, D.I.; Murfin, W.B. [Technadyne Engineering Consultants, Inc., Albuquerque, NM (United States)

1996-05-01T23:59:59.000Z

164

Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup, and Oxygen Separation Equipment; Task 1: Cost Estimates of Small Modular Systems  

SciTech Connect (OSTI)

This deliverable is the Final Report for Task 1, Cost Estimates of Small Modular Systems, as part of NREL Award ACO-5-44027, ''Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup and Oxygen Separation Equipment''. Subtask 1.1 looked into processes and technologies that have been commercially built at both large and small scales, with three technologies, Fluidized Catalytic Cracking (FCC) of refinery gas oil, Steam Methane Reforming (SMR) of Natural Gas, and Natural Gas Liquids (NGL) Expanders, chosen for further investigation. These technologies were chosen due to their applicability relative to other technologies being considered by NREL for future commercial applications, such as indirect gasification and fluidized bed tar cracking. Research in this subject is driven by an interest in the impact that scaling has on the cost and major process unit designs for commercial technologies. Conclusions from the evaluations performed could be applied to other technologies being considered for modular or skid-mounted applications.

Nexant Inc.

2006-05-01T23:59:59.000Z

165

Location Estimation with a Differential Update Ali Rahimi and Trevor Darrell  

E-Print Network [OSTI]

algorithm by cal- culating globally consistent trajectories of a robot as it navigates along a 2D trajectory. To update a trajectory of length t, the update takes O(t). When all conditional distributions are linear to recover the trajectory of a robot given noisy measurements of its movement between points in its

Darrell, Trevor

166

Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup, and Oxygen Separation Equipment; Task 2: Gas Cleanup Design and Cost Estimates -- Wood Feedstock  

SciTech Connect (OSTI)

As part of Task 2, Gas Cleanup and Cost Estimates, Nexant investigated the appropriate process scheme for treatment of wood-derived syngas for use in the synthesis of liquid fuels. Two different 2,000 metric tonne per day gasification schemes, a low-pressure, indirect system using the gasifier, and a high-pressure, direct system using gasification technology were evaluated. Initial syngas conditions from each of the gasifiers was provided to the team by the National Renewable Energy Laboratory. Nexant was the prime contractor and principal investigator during this task; technical assistance was provided by both GTI and Emery Energy.

Nexant Inc.

2006-05-01T23:59:59.000Z

167

Cost estimate of high-level radioactive waste containers for the Yucca Mountain Site Characterization Project  

SciTech Connect (OSTI)

This report summarizes the bottoms-up cost estimates for fabrication of high-level radioactive waste disposal containers based on the Site Characterization Plan Conceptual Design (SCP-CD). These estimates were acquired by Babcock and Wilcox (B&S) under sub-contract to Lawrence Livermore National Laboratory (LLNL) for the Yucca Mountain Site Characterization Project (YMP). The estimates were obtained for two leading container candidate materials (Alloy 825 and CDA 715), and from other three vendors who were selected from a list of twenty solicited. Three types of container designs were analyzed that represent containers for spent fuel, and for vitrified high-level waste (HLW). The container internal structures were assumed to be AISI-304 stainless steel in all cases, with an annual production rate of 750 containers. Subjective techniques were used for estimating QA/QC costs based on vendor experience and the specifications derived for the LLNL-YMP Quality Assurance program. In addition, an independent QA/QC analysis is reported which was prepared by Kasier Engineering. Based on the cost estimates developed, LLNL recommends that values of $825K and $62K be used for the 1991 TSLCC for the spent fuel and HLW containers, respectively. These numbers represent the most conservative among the three vendors, and are for the high-nickel anstenitic steel (Alloy 825). 6 refs., 7 figs.

Russell, E.W.; Clarke, W. [Lawrence Livermore National Lab., CA (United States)] [Lawrence Livermore National Lab., CA (United States); Domian, H.A. [Babcock and Wilcox Co., Lynchburg, VA (United States)] [Babcock and Wilcox Co., Lynchburg, VA (United States); Madson, A.A. [Kaiser Engineers California Corp., Oakland, CA (United States)] [Kaiser Engineers California Corp., Oakland, CA (United States)

1991-08-01T23:59:59.000Z

168

ORNL/TM-2005/45 COSTS OF U.S. OIL DEPENDENCE: 2005 UPDATE  

E-Print Network [OSTI]

..........................................................................................29 5.2 CASE 1A: OIL PRICE ELASTICITY OF GDP VARIES WITH OIL COST SHARE .......................................................................................................36 5.3 CASE 1B: OIL PRICE ELASTICITY OF GDP CONSTANT OVER TIME ......37 5.4 CASE 2: STOCHASTIC ....................................................................................40 5.6 THE IMPACT OF CONTINUED HIGH OIL PRICES IN 2005..........................42 6. CONCLUSIONS

169

Item No. 3 process facilities cost estimates and schedules for facilities capability assurance program nuclear facilities modernization - FY 1989 line item, authorization No. D79  

SciTech Connect (OSTI)

Data is presented concerning cost estimates and schedules for process facilities and nuclear facilities modernization.

NONE

1989-07-01T23:59:59.000Z

170

DEEPWATER HORIZON OIL SPILL ESTIMATE: UPDATE JUNE 11, 2010 by Professor Satish Nagarajaiah, Rice University (www.ruf.rice.edu/~nagaraja &  

E-Print Network [OSTI]

DEEPWATER HORIZON OIL SPILL ESTIMATE: UPDATE JUNE 11, 2010 by Professor Satish Nagarajaiah, Rice. http://www.nytimes.com/2010/06/11/us/11spill.html?hp New Estimates Double Rate of Oil Flowing on Thursday essentially doubled its estimate of how much oil has been spewing from the out-of-control BP well

Nagarajaiah, Satish

171

Table 1. Updated estimates of power plant capital and operating costs  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ <Information Administration (EIA) 10 MECS Survey Data9c : U.S.Welcome to the1,033 15 678

172

Critical analysis of the Hanford spent nuclear fuel project activity based cost estimate  

SciTech Connect (OSTI)

In 1997, the SNFP developed a baseline change request (BCR) and submitted it to DOE-RL for approval. The schedule was formally evaluated to have a 19% probability of success [Williams, 1998]. In December 1997, DOE-RL Manager John Wagoner approved the BCR contingent upon a subsequent independent review of the new baseline. The SNFP took several actions during the first quarter of 1998 to prepare for the independent review. The project developed the Estimating Requirements and Implementation Guide [DESH, 1998] and trained cost account managers (CAMS) and other personnel involved in the estimating process in activity-based cost (ABC) estimating techniques. The SNFP then applied ABC estimating techniques to develop the basis for the December Baseline (DB) and documented that basis in Basis of Estimate (BOE) books. These BOEs were provided to DOE in April 1998. DOE commissioned Professional Analysis, Inc. (PAI) to perform a critical analysis (CA) of the DB. PAI`s review formally began on April 13. PAI performed the CA, provided three sets of findings to the SNFP contractor, and initiated reconciliation meetings. During the course of PAI`s review, DOE directed the SNFP to develop a new baseline with a higher probability of success. The contractor transmitted the new baseline, which is referred to as the High Probability Baseline (HPB), to DOE on April 15, 1998 [Williams, 1998]. The HPB was estimated to approach a 90% confidence level on the start of fuel movement [Williams, 1998]. This high probability resulted in an increased cost and a schedule extension. To implement the new baseline, the contractor initiated 26 BCRs with supporting BOES. PAI`s scope was revised on April 28 to add reviewing the HPB and the associated BCRs and BOES.

Warren, R.N.

1998-09-29T23:59:59.000Z

173

Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup, and Oxygen Separation Equipment; Task 2: Gas Cleanup Design and Cost Estimates -- Black Liquor Gasification  

SciTech Connect (OSTI)

As part of Task 2, Gas Cleanup and Cost Estimates, Nexant investigated the appropriate process scheme for removal of acid gases from black liquor-derived syngas for use in both power and liquid fuels synthesis. Two 3,200 metric tonne per day gasification schemes, both low-temperature/low-pressure (1100 deg F, 40 psi) and high-temperature/high-pressure (1800 deg F, 500 psi) were used for syngas production. Initial syngas conditions from each of the gasifiers was provided to the team by the National Renewable Energy Laboratory and Princeton University. Nexant was the prime contractor and principal investigator during this task; technical assistance was provided by both GTI and Emery Energy.

Nexant Inc.

2006-05-01T23:59:59.000Z

174

Oxygenation cost estimates in 1983 dollars for Cherokee and Douglas Dams  

SciTech Connect (OSTI)

As part of the Reservoir Releases Program, estimates of costs associated with providing high purity oxygen injection systems at Cherokee and Douglas Dams were computed in 1983 dollars. This report presents results of the computations. An 8.125% interest rate, a 25-year economic life, and a 10-year diffuser life were assumed. Weekly average dissolved oxygen concentration (DO) and turbine flowrate data were available for the years 1958 through 1980. 4 refs., 6 figs., 3 tabs.

Fain, T.G.; Boyd, J.W.

1983-12-01T23:59:59.000Z

175

Estimated groundwater restoration costs associated with commercial underground coal gasification operations. Topical report  

SciTech Connect (OSTI)

The objective of this program was to complete a preliminary cost estimate for groundwater restoration for the Hoe Creek commercial underground coal gasification (UCG) facility under a set of ground rules based on field data measurements and specific compound removal requirements. Of the three approaches evaluated for disposal of the contaminated groundwater, deep well injection is the least expensive, followed by the alternate treatment approach.

Fischer, D.D.

1985-12-17T23:59:59.000Z

176

Methodological Approaches for Estimating the Benefits and Costs of Smart Grid Demonstration Projects  

SciTech Connect (OSTI)

This report presents a comprehensive framework for estimating the benefits and costs of Smart Grid projects and a step-by-step approach for making these estimates. The framework identifies the basic categories of benefits, the beneficiaries of these benefits, and the Smart Grid functionalities that lead to different benefits and proposes ways to estimate these benefits, including their monetization. The report covers cost-effectiveness evaluation, uncertainty, and issues in estimating baseline conditions against which a project would be compared. The report also suggests metrics suitable for describing principal characteristics of a modern Smart Grid to which a project can contribute. This first section of the report presents background information on the motivation for the report and its purpose. Section 2 introduces the methodological framework, focusing on the definition of benefits and a sequential, logical process for estimating them. Beginning with the Smart Grid technologies and functions of a project, it maps these functions to the benefits they produce. Section 3 provides a hypothetical example to illustrate the approach. Section 4 describes each of the 10 steps in the approach. Section 5 covers issues related to estimating benefits of the Smart Grid. Section 6 summarizes the next steps. The methods developed in this study will help improve future estimates - both retrospective and prospective - of the benefits of Smart Grid investments. These benefits, including those to consumers, society in general, and utilities, can then be weighed against the investments. Such methods would be useful in total resource cost tests and in societal versions of such tests. As such, the report will be of interest not only to electric utilities, but also to a broad constituency of stakeholders. Significant aspects of the methodology were used by the U.S. Department of Energy (DOE) to develop its methods for estimating the benefits and costs of its renewable and distributed systems integration demonstration projects as well as its Smart Grid Investment Grant projects and demonstration projects funded under the American Recovery and Reinvestment Act (ARRA). The goal of this report, which was cofunded by the Electric Power Research Institute (EPRI) and DOE, is to present a comprehensive set of methods for estimating the benefits and costs of Smart Grid projects. By publishing this report, EPRI seeks to contribute to the development of methods that will establish the benefits associated with investments in Smart Grid technologies. EPRI does not endorse the contents of this report or make any representations as to the accuracy and appropriateness of its contents. The purpose of this report is to present a methodological framework that will provide a standardized approach for estimating the benefits and costs of Smart Grid demonstration projects. The framework also has broader application to larger projects, such as those funded under the ARRA. Moreover, with additional development, it will provide the means for extrapolating the results of pilots and trials to at-scale investments in Smart Grid technologies. The framework was developed by a panel whose members provided a broad range of expertise.

Lee, Russell [ORNL

2010-01-01T23:59:59.000Z

177

Estimates of Energy Cost Savings Achieved from 2009 IECC Code-Compliant, Single Family Residences in Texas  

E-Print Network [OSTI]

The annual energy cost savings were estimated with $0.11/kWh for electricity and $0.84/therm (Climate Zone 2) and $0.64/therm (Climate Zone 3 and 4) for natural gas. 2009 IECC Cost Savings Report, p.ii January 2011 Energy Systems Laboratory, Texas A...). 3.2 Annual Total Energy Cost Similar trends were observed in the annual energy costs estimated with $0.11/kWh for electricity and $0.84/therm (Climate Zone 2) and $0.64/therm (Climate Zone 3 and 4) for natural gas. Across the counties, the 2001...

Kim, H.; Baltazar, J. C.; Haberl, J.

178

Hydrogen Pathways: Updated Cost, Well-to-Wheels Energy Use, and Emissions for the Current Technology Status of Ten Hydrogen Production, Delivery, and Distribution Scenarios  

SciTech Connect (OSTI)

This report describes a life-cycle assessment conducted by the National Renewable Energy Laboratory (NREL) of 10 hydrogen production, delivery, dispensing, and use pathways that were evaluated for cost, energy use, and greenhouse gas (GHG) emissions. This evaluation updates and expands on a previous assessment of seven pathways conducted in 2009. This study summarizes key results, parameters, and sensitivities to those parameters for the 10 hydrogen pathways, reporting on the levelized cost of hydrogen in 2007 U.S. dollars as well as life-cycle well-to-wheels energy use and GHG emissions associated with the pathways.

Ramsden, T.; Ruth, M.; Diakov, V.; Laffen, M.; Timbario, T. A.

2013-03-01T23:59:59.000Z

179

Cost and energy consumption estimates for the aluminum-air battery anode fuel cycle  

SciTech Connect (OSTI)

At the request of DOE's Office of Energy Storage and Distribution (OESD), Pacific Northwest Laboratory (PNL) conducted a study to generate estimates of the energy use and costs associated with the aluminum anode fuel cycle of the aluminum-air (Al-air) battery. The results of this analysis indicate that the cost and energy consumption characteristics of the mechanically rechargeable Al-air battery system are not as attractive as some other electrically rechargeable electric vehicle battery systems being developed by OESD. However, there are distinct advantages to mechanically rechargeable batteries, which may make the Al-air battery (or other mechanically rechargeable batteries) attractive for other uses, such as stand-alone applications. Fuel cells, such as the proton exchange membrane (PEM), and advanced secondary batteries may be better suited to electric vehicle applications. 26 refs., 3 figs., 25 tabs.

Humphreys, K.K.; Brown, D.R.

1990-01-01T23:59:59.000Z

180

Estimated Costs and Returns for Catfish Farms with Recirculating Ponds Along the Upper Texas Coast.  

E-Print Network [OSTI]

_TDOC ' Z TA24S.7 8873 NO.1704 - . , ., TEXAS A&M UNIVERSHY LIBRARY for Catfish Farms ' with Recirculating Ponds Along ? . . the Upper Texas Coast ~7'!K~fi~~~ation ? J. Charles Lee: Interim Director? The Texas A&M University System ? C...~J1ege Station, Texas :,. .,: (Blank Page in OrigiBal BuBetiol ' 1iJ. ~ ; :; . : . . / I Estimated Costs and Returns for Catfish Farms with Recirculating Ponds Along the Upper Texas Coast J.A.D. Lambregts, Marketing Manager for Niaid...

Lambregts, J.A.D.; Griffin, W.L.; Lacewell R.D.; Davis, J.T.; Clary, G.M.

1992-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Hanford ETR- Tank Waste Treatment and Immobilization Plant- Hanford Tank Waste Treatment and Immobilization Plant Technical Review- Estimate at Completion (Cost) Report  

Broader source: Energy.gov [DOE]

This is a comprehensive review ofthe Hanford WTP estimate at completion - assessing the project scope, contract requirements, management execution plant, schedule, cost estimates, and risks.

182

Texas Tech University Energy Savings Program November 2008 Update  

E-Print Network [OSTI]

costs and campus square footage. For the fourth quarter of FY08 the campus consumed 42.36 kbtu/sq ft Program for four energy projects. 1) AHU VFD Project ­ Estimated cost of $600,000 with a payback of 2Texas Tech University Energy Savings Program November 2008 Update The Texas Tech Energy Savings

Gelfond, Michael

183

Enhance accuracy in Software cost and schedule estimation by using "Uncertainty Analysis and Assessment" in the system modeling process  

E-Print Network [OSTI]

Accurate software cost and schedule estimation are essential for software project success. Often it referred to as the "black art" because of its complexity and uncertainty, software estimation is not as difficult or puzzling as people think. In fact, generating accurate estimates is straightforward-once you understand the intensity of uncertainty and framework for the modeling process. The mystery to successful software estimation-distilling academic information and real-world experience into a practical guide for working software professionals. Instead of arcane treatises and rigid modeling techniques, this will guide highlights a proven set of procedures, understandable formulas, and heuristics that individuals and development teams can apply to their projects to help achieve estimation proficiency with choose appropriate development approaches In the early stage of software life cycle project manager are inefficient to estimate the effort, schedule, cost estimation and its development approach .This in tu...

Vasantrao, Kardile Vilas

2011-01-01T23:59:59.000Z

184

update: Species–area curves and the estimation of extinction rates  

E-Print Network [OSTI]

2011)  Extinctions:  consider  all  species.   Nature, 474, Species–area  relationships  always overestimate extinction and the estimation of extinction rates  The  species–area 

Beck, Jan

2011-01-01T23:59:59.000Z

185

Update of Hydrogen from Biomass - Determination of the Delivered...  

Office of Environmental Management (EM)

Update of Hydrogen from Biomass - Determination of the Delivered Cost of Hydrogen: Milestone Completion Report Update of Hydrogen from Biomass - Determination of the Delivered Cost...

186

Cost estimation of HVDC transmission system of Bangka’s NPP candidates  

SciTech Connect (OSTI)

Regarding nuclear power plant development in Bangka Island, it can be estimated that produced power will be oversupply for the Bangka Island and needs to transmit to Sumatra or Java Island. The distance between the regions or islands causing considerable loss of power in transmission by alternating current, and a wide range of technical and economical issues. The objective of this paper addresses to economics analysis of direct current transmission system to overcome those technical problem. Direct current transmission has a stable characteristic, so that the power delivery from Bangka to Sumatra or Java in a large scale efficiently and reliably can be done. HVDC system costs depend on the power capacity applied to the system and length of the transmission line in addition to other variables that may be different.

Liun, Edwaren, E-mail: edwaren@batan.go.id; Suparman, E-mail: edwaren@batan.go.id [Centre for Nuclear Energy Development, National Nuclear Energy Agency of Indonesia (Indonesia)

2014-09-30T23:59:59.000Z

187

Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 4: Project cost estimate  

SciTech Connect (OSTI)

The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. This volume represents the total estimated costs for the W113 facility. Operating Contractor Management costs have been incorporated as received from WHC. The W113 Facility TEC is $19.7 million. This includes an overall project contingency of 14.4% and escalation of 17.4%. A January 2001 construction contract procurement start date is assumed.

NONE

1995-09-01T23:59:59.000Z

188

DOE TASK 99-5 Update REFINEMENT AND VALIDATION OF IN SITU PARAMETER ESTIMATION  

E-Print Network [OSTI]

and Aerospace Engineering Stillwater, OK KEY WORDS geothermal energy, ground coupled, heat pump, heat exchanger facing designers of Ground Source Heat Pump (GSHP) systems applied in commercial, institutional as well as large residential buildings. The number of boreholes and the depth and cost of each borehole are highly

189

Answers to questions about updated estimates of occupational radiation doses at Three Mile Island, Unit 2  

SciTech Connect (OSTI)

The purpose of this question and answer report is to provide a clear, easy-to-understand explanation of revised radiation dose estimates which workers are likely to receive over the course of the cleanup at Three Mile Island, Unit 2, and of the possible health consequences to workers of these new estimates. We will focus primarily on occupational dose, although pertinent questions about public health and safety will also be answered.

Not Available

1983-12-01T23:59:59.000Z

190

The Health and Visibility Cost of Air Pollution: A Comparison of Estimation Methods  

E-Print Network [OSTI]

economics, air pollution, health effects, visibility,Cost of Health Effects of Motor Vehicle Air Pollution. UCD-of the health costs of air pollution (because individuals

Delucchi, Mark; Murphy, James; McCubbin, Donald

2002-01-01T23:59:59.000Z

191

Updated estimation of energy efficiencies of U.S. petroleum refineries.  

SciTech Connect (OSTI)

Evaluation of life-cycle (or well-to-wheels, WTW) energy and emission impacts of vehicle/fuel systems requires energy use (or energy efficiencies) of energy processing or conversion activities. In most such studies, petroleum fuels are included. Thus, determination of energy efficiencies of petroleum refineries becomes a necessary step for life-cycle analyses of vehicle/fuel systems. Petroleum refinery energy efficiencies can then be used to determine the total amount of process energy use for refinery operation. Furthermore, since refineries produce multiple products, allocation of energy use and emissions associated with petroleum refineries to various petroleum products is needed for WTW analysis of individual fuels such as gasoline and diesel. In particular, GREET, the life-cycle model developed at Argonne National Laboratory with DOE sponsorship, compares energy use and emissions of various transportation fuels including gasoline and diesel. Energy use in petroleum refineries is key components of well-to-pump (WTP) energy use and emissions of gasoline and diesel. In GREET, petroleum refinery overall energy efficiencies are used to determine petroleum product specific energy efficiencies. Argonne has developed petroleum refining efficiencies from LP simulations of petroleum refineries and EIA survey data of petroleum refineries up to 2006 (see Wang, 2008). This memo documents Argonne's most recent update of petroleum refining efficiencies.

Palou-Rivera, I.; Wang, M. Q. (Energy Systems)

2010-12-08T23:59:59.000Z

192

Estimating the variable cost for high-volume and long-haul transportation of densified biomass and biofuel  

SciTech Connect (OSTI)

This article analyzes rail transportation costs of products that have similar physical properties as densified biomass and biofuel. The results of this cost analysis are useful to understand the relationship and quantify the impact of a number of factors on rail transportation costs of denisfied biomass and biofuel. These results will be beneficial and help evaluate the economic feasibility of high-volume and long-haul transportation of biomass and biofuel. High-volume and long-haul rail transportation of biomass is a viable transportation option for biofuel plants, and for coal plants which consider biomass co-firing. Using rail optimizes costs, and optimizes greenhouse gas (GHG) emissions due to transportation. Increasing bioenergy production would consequently result in lower GHG emissions due to displacing fossil fuels. To estimate rail transportation costs we use the carload waybill data, provided by Department of Transportation’s Surface Transportation Board for products such as grain and liquid type commodities for 2009 and 2011. We used regression analysis to quantify the relationship between variable transportation unit cost ($/ton) and car type, shipment size, rail movement type, commodity type, etc. The results indicate that: (a) transportation costs for liquid is $2.26/ton–$5.45/ton higher than grain type commodity; (b) transportation costs in 2011 were $1.68/ton–$5.59/ton higher than 2009; (c) transportation costs for single car shipments are $3.6/ton–$6.68/ton higher than transportation costs for multiple car shipments of grains; (d) transportation costs for multiple car shipments are $8.9/ton and $17.15/ton higher than transportation costs for unit train shipments of grains.

Jacob J. Jacobson; Erin Searcy; Md. S. Roni; Sandra D. Eksioglu

2014-06-01T23:59:59.000Z

193

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

technology * 2015 projected technology 2 Determine costs for these 3 tech level Fuel Cell System Battery System Storage 2. Determine costs for these 3 tech level systems at 5...

194

Improving the parametric method of cost estimating relationships of naval ships  

E-Print Network [OSTI]

In light of recent military budget cuts, there has been a recent focus on determining methods to reduce the cost of Navy ships. A RAND National Defense Research Institute study showed many sources of cost escalation for ...

Lee, Ungtae (Jeremy Ungtae)

2014-01-01T23:59:59.000Z

195

Current (2009) State-of-the-Art Hydrogen Production Cost Estimate Using Water Electrolysis: Independent Review  

SciTech Connect (OSTI)

This independent review examines DOE cost targets for state-of-the art hydrogen production using water electrolysis.

Not Available

2009-09-01T23:59:59.000Z

196

Rough order of magnitude cost estimate for immobilization of 50MT of plutonium using new faciliites at the Savannah River site: alternative 12A  

SciTech Connect (OSTI)

The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 50 metric tons of plutonium using ceramic in a new facility at Savannah River Site (SRS).

DiSabatino, A., LLNL

1998-06-01T23:59:59.000Z

197

A new database of residential building measures and estimated costs helps the U.S. building industry determine the most  

E-Print Network [OSTI]

A new database of residential building measures and estimated costs helps the U.S. building at the National Renewable Energy Laboratory (NREL) have developed the National Residential Efficiency Measures with using various measures to improve the efficiency of residential buildings. This database offers

198

Cost and U.S. public policy for new coal power plants with carbon capture and sequestration  

E-Print Network [OSTI]

This paper provides a financial analysis for new supercritical pulverized coal plants with carbon capture and sequestration (CCS) that compares the effects of two relevant climate policies. First, an updated cost estimate ...

Hamilton, Michael R.

199

Eagle Project Update Eagle P3 Project Update  

E-Print Network [OSTI]

) offers 11-minute travel time to Westminster #12;5 Eagle P3 Project Scope · Overall capital cost $2 for cost effective index · Allows RTD to spread the cost of the project over a longer time periodEagle Project Update Eagle P3 Project Update Rick Clarke Assistant General Manager, Capital

Bustamante, Fabián E.

200

Operating Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

1997-03-28T23:59:59.000Z

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Estimate Costs to Implement Greenhouse Gas Mitigation Strategies for Business Travel  

Broader source: Energy.gov [DOE]

Once business travel reduction strategies have been identified, a Federal agency may evaluate the cost of implementing those measures and any potential savings from avoided travel.

202

A SURVEY OF STATE-LEVEL COST ESTIMATES OF RENEWABLES PORTFOLIO STANDARDS  

E-Print Network [OSTI]

Energy Efficiency and Renewable Energy (Solar TechnologiesRPS costs, per unit of renewable energy generation, rangedFlores-Espino National Renewable Energy Laboratory 15013

Barbose, Galen

2014-01-01T23:59:59.000Z

203

Use of experience curves to estimate the future cost of power plants with CO2 capture  

E-Print Network [OSTI]

2004. Experience curves for power plant emission controlassessments of fossil fuel power plants with CO 2 capturethe future cost of power plants with CO 2 capture Edward S.

Rubin, Edward S.; Yeh, Sonia; Antes, Matt; Berkenpas, Michael; Davison, John

2007-01-01T23:59:59.000Z

204

Program Potential: Estimates of Federal Energy Cost Savings from Energy Efficient Procurement  

E-Print Network [OSTI]

Water Heaters ..Table 7: Annual energy and cost savings of water heaters (Boilers Commercial Water Heater See Appendix F for

Taylor, Margaret

2014-01-01T23:59:59.000Z

205

Cost Estimating for Decommissioning of a Plutonium Facility--Lessons Learned From The Rocky Flats Building 771 Project  

SciTech Connect (OSTI)

The Rocky Flats Closure Site is implementing an aggressive approach in an attempt to complete Site closure by 2006. The replanning effort to meet this goal required that the life-cycle decommissioning effort for the Site and for the major individual facilities be reexamined in detail. As part of the overall effort, the cost estimate for the Building 771 decommissioning project was revised to incorporate both actual cost data from a recently-completed similar project and detailed planning for all activities. This paper provides a brief overview of the replanning process and the original estimate, and then discusses the modifications to that estimate to reflect new data, methods, and planning rigor. It provides the new work breakdown structure and discusses the reasons for the final arrangement chosen. It follows with the process used to assign scope, cost, and schedule elements within the new structure, and development of the new code of accounts. Finally, it describes the project control methodology used to track the project, and provides lessons learned on cost tracking in the decommissioning environment.

Stevens, J. L.; Titus, R.; Sanford, P. C.

2002-02-26T23:59:59.000Z

206

Costs and Benefits of Renewables Portfolio Standards in the United States  

E-Print Network [OSTI]

Interagency Working Group on Social Cost of Carbon (2013).Technical Update of the Social Cost of Carbon for Regulatorytechnical-update-social-cost-of-carbon-for-regulator-

Barbose, Galen

2014-01-01T23:59:59.000Z

207

The Costs and Benefits of Compliance with Renewable Portfolio Standards: Reviewing Experience to Date  

E-Print Network [OSTI]

Interagency Working Group on Social Cost of Carbon (2013).Technical Update of the Social Cost of Carbon for Regulatorytechnical-update-social-cost-of-carbon- for-regulator-

Heeter, Jenny

2014-01-01T23:59:59.000Z

208

A conceptual model to estimate cost effectiveness of the indoor environment improvements  

SciTech Connect (OSTI)

Macroeconomic analyses indicate a high cost to society of a deteriorated indoor climate. The few example calculations performed to date indicate that measures taken to improve IEQ are highly cost-effective when health and productivity benefits are considered. We believe that cost-benefit analyses of building designs and operations should routinely incorporate health and productivity impacts. As an initial step, we developed a conceptual model that shows the links between improvements in IEQ and the financial gains from reductions in medical care and sick leave, improved work performance, lower employee turn over, and reduced maintenance due to fewer complaints.

Seppanen, Olli; Fisk, William J.

2003-06-01T23:59:59.000Z

209

MRS/IS facility co-located with a repository: preconceptual design and life-cycle cost estimates  

SciTech Connect (OSTI)

A program is described to examine the various alternatives for monitored retrievable storage (MRS) and interim storage (IS) of spent nuclear fuel, solidified high-level waste (HLW), and transuranic (TRU) waste until appropriate geologic repository/repositories are available. The objectives of this study are: (1) to develop a preconceptual design for an MRS/IS facility that would become the principal surface facility for a deep geologic repository when the repository is opened, (2) to examine various issues such as transportation of wastes, licensing of the facility, and environmental concerns associated with operation of such a facility, and (3) to estimate the life cycle costs of the facility when operated in response to a set of scenarios which define the quantities and types of waste requiring storage in specific time periods, which generally span the years from 1990 until 2016. The life cycle costs estimated in this study include: the capital expenditures for structures, casks and/or drywells, storage areas and pads, and transfer equipment; the cost of staff labor, supplies, and services; and the incremental cost of transporting the waste materials from the site of origin to the MRS/IS facility. Three scenarios are examined to develop estimates of life cycle costs of the MRS/IS facility. In the first scenario, HLW canisters are stored, starting in 1990, until the co-located repository is opened in the year 1998. Additional reprocessing plants and repositories are placed in service at various intervals. In the second scenario, spent fuel is stored, starting in 1990, because the reprocessing plants are delayed in starting operations by 10 years, but no HLW is stored because the repositories open on schedule. In the third scenario, HLW is stored, starting in 1990, because the repositories are delayed 10 years, but the reprocessing plants open on schedule.

Smith, R.I.; Nesbitt, J.F.

1982-11-01T23:59:59.000Z

210

Validating the Estimated Cost of Saving Water Through Infrastructure Rehabilitation in the Texas Lower Rio Grande Valley  

E-Print Network [OSTI]

As shown in Table 1, the original estimated initial capital construction costs totaled $2,356,000, with the revised, actual value being $2,504,435 (Balcombe). The installation period was projected to take (and remained at) one year, with an ensuing... uncertainty and multiple analyses are an underlying theme and related inference that consistent and attentive methods of analysis, such as those documented in Rister et al. 2002, are warranted. References Balcombe, Collins. Director, Special Projects, U...

Sturdivant, A.; Rister, M.; Lacewell, R.

211

Estimate Costs to Implement Greenhouse Gas Mitigation Strategies for Vehicles and Mobile Equipment  

Broader source: Energy.gov [DOE]

Once a Federal agency identifies the various strategic opportunities to reduce greenhouse gas (GHG) emissions for vehicles and mobile equipment, it is necessary to evaluate the associated costs of adopting each strategy.

212

The impact of trade costs on rare earth exports : a stochastic frontier estimation approach.  

SciTech Connect (OSTI)

The study develops a novel stochastic frontier modeling approach to the gravity equation for rare earth element (REE) trade between China and its trading partners between 2001 and 2009. The novelty lies in differentiating betweenbehind the border' trade costs by China and theimplicit beyond the border costs' of China's trading partners. Results indicate that the significance level of the independent variables change dramatically over the time period. While geographical distance matters for trade flows in both periods, the effect of income on trade flows is significantly attenuated, possibly capturing the negative effects of financial crises in the developed world. Second, the total export losses due tobehind the border' trade costs almost tripled over the time period. Finally, looking atimplicit beyond the border' trade costs, results show China gaining in some markets, although it is likely that some countries are substituting away from Chinese REE exports.

Sanyal, Prabuddha; Brady, Patrick Vane; Vugrin, Eric D.

2013-09-01T23:59:59.000Z

213

Utilizing an encroachment probability benefit-cost model to estimate accident reduction factors  

E-Print Network [OSTI]

Improving safety on Texas roadways is a major public concern. Over the years, the Texas Department of Transportation and other highway agencies have become interested in reducing society's accident cost while maximizing returns on accident...

Hayes, Carolyn A

1997-01-01T23:59:59.000Z

214

Development of Decision Support Software to Estimate the Cost of Transporting and Ginning of Seed Cotton  

E-Print Network [OSTI]

distance to modules (D). ................................... 37 Table 11. Results of ANOVA showing that average distance and %U did not result in a statistically significant change in variable costs per mile at a 95% confidence interval for a module... in variable costs per mile at a 95% confidence interval for a semi-tractor trailer. .......................................... 46 1 CHAPTER I INTRODUCTION, LITERATURE REVIEW, AND OBJECTIVES Texas has experienced a reduction in the total...

Grier, Jordan Lee

2014-08-13T23:59:59.000Z

215

Estimating Marginal Cost of Quality Improvements: The Case of the UK Electricity Distribution Companies  

E-Print Network [OSTI]

of operational and capital expenditures (Totex) as the dependent variable. Improving quality of services involves operating cost (Opex) and capital cost (Capex) for the utilities. Due to the presence of possible trade-offs between Opex and Capex (Giannakis et... saving Opex than by an equal amount of Capex reduction (Ofgem, 2003a). Hence, in order to examine existence of different strategies in the UK utilities to improve quality, and to ascertain whether the current regulation has distorted the allocation...

Jamasb, Tooraj; Orea, Luis; Pollitt, Michael G.

216

Electric Power Interruption Cost Estimates for Individual Industries, Sectors, and U.S. Economy  

SciTech Connect (OSTI)

During the last 20 years, utilities and researchers have begun to understand the value in the collection and analysis of interruption cost data. The continued investigation of the monetary impact of power outages will facilitate the advancement of the analytical methods used to measure the costs and benefits from the perspective of the energy consumer. More in-depth analysis may be warranted because of the privatization and deregulation of power utilities, price instability in certain regions of the U.S. and the continued evolution of alternative auxiliary power systems.

Balducci, Patrick J.; Roop, Joseph M.; Schienbein, Lawrence A.; DeSteese, John G.; Weimar, Mark R.

2002-02-27T23:59:59.000Z

217

A computer solution for estimating owning and operating costs for over-the-road hauling units  

E-Print Network [OSTI]

OF CONTENTS PAGE ABSTRACT ACKNOWLEDGEMENT S iv LIST OF TABLES LIST OF FIGURES vii ix CHAPTER I INTRODUCTION II OVER-THE-ROAD HAULING UNITS Characteristics Preliminary Purchase Investigation Vehicle Specifications Fuel Type Weight Restrictions... SIMULATION RUN III OUTPUT, SECOND SIMULATION RUN 88 101 113 VITA 125 yii LIST OF TABLES TABLE PAGE Major On-Highway Truck Manufacturers Gross Vehicle Weight (GVW) Components 10 12 3. (a) Fuel Costs Per Gallon 3. (b) Fuel Consumed Per Brake HP...

Wenners, Edward Bernard

1972-01-01T23:59:59.000Z

218

Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't HappenLow-CostManufacturingMarginalMarket|

219

Validating the Estimated Cost of Saving Water Through Infrastructure Rehabilitation in the Texas Lower Rio Grande Valley  

E-Print Network [OSTI]

316,871 ....................same $?s $ 20,071 ....................same As shown in Table 1, the original estimated initial capital construction costs totaled $3,585,300 with the revised, actual value equaling $3,278,276 (Balcombe). The installation...,715,000 with the revised, actual value being $7,273,360 (Balcombe). The installation period was projected to take two years, with an ensuing expected useful life of 48 years. No losses of operations or other adverse impacts were anticipated (nor did they occur...

Sturdivant, A. W.; Rister, M.; Lacewell, R. D.; Rogers, C. S.

220

Low Cost Power and Supply Noise Estimation and Control in Scan Testing of VLSI Circuits  

E-Print Network [OSTI]

. To achieve constant test power, first, we built a fast and accurate power model, which can estimate the shift power without logic simulation of the circuit. We also proposed an efficient and low power X-bit Filling process, which could potentially reduce both...

Jiang, Zhongwei

2012-02-14T23:59:59.000Z

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Zoology 110 (2007) 8192 How accurately can we estimate energetic costs in a marine top predator,  

E-Print Network [OSTI]

Mammal Research Unit, 2202 Main Hall, Vancouver, Canada V6T 1Z4 c Institut Pluridisciplinaire Hubert to be significant, only an accurate knowledge of their energy demands will indicate their true food requirements. Energy consumption has been estimated for many marine species using the heart rate­rate of oxygen

Fahlman, Andreas

222

Updated U.S. Geothermal Supply Characterization and Representation for Market Penetration Model Input  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Geothermal Technologies Program (GTP) tasked the National Renewable Energy Laboratory (NREL) with conducting the annual geothermal supply curve update. This report documents the approach taken to identify geothermal resources, determine the electrical producing potential of these resources, and estimate the levelized cost of electricity (LCOE), capital costs, and operating and maintenance costs from these geothermal resources at present and future timeframes under various GTP funding levels. Finally, this report discusses the resulting supply curve representation and how improvements can be made to future supply curve updates.

Augustine, C.

2011-10-01T23:59:59.000Z

223

The South Wilmington Area remedial cost estimating methodology (RCEM) -- A planning tool and reality check for brownfield development  

SciTech Connect (OSTI)

The South Wilmington Area (SWA), which is comprised of 200 acres of multi-use urban lowlands adjacent to the Christina River, is a brownfields area that has been targeted for redevelopment/restoration as part of a major waterfront revitalization project for the City of Wilmington, Delaware. The vision for this riverfront development, which is being promoted by a state-funded development corporation, includes plans for a new harbor, convention and entertainment facilities, upscale residences, an urban wildlife refuge, and the restoration of the Christina River. However, the environmental quality of the SWA has been seriously impacted by an assortment of historic and current heavy industrial land-uses since the late 1800`s, and extensive environmental cleanup of this area will be required as part of any redevelopment plan. Given that the environmental cleanup cost will be a major factor in determining the overall economic feasibility of brownfield development in the SWA, a reliable means of estimating potential preliminary remedial costs, without the expense of costly investigative and engineering studies, was needed to assist with this redevelopment initiative. The primary chemicals-of-concern (COCs) area-wide are lead and petroleum compounds, however, there are hot-spot occurrences of polynuclear aromatic hydrocarbons (PAHs), PCBs, and other heavy metals such as arsenic and mercury.

Yancheski, T.B. [Tetra Tech, Inc., Christiana, DE (United States); Swanson, J.E. [Tetra Tech, Inc., Fairfax, VA (United States)

1996-12-31T23:59:59.000Z

224

Energy Storage Systems 2010 Update Conference Presentations ...  

Broader source: Energy.gov (indexed) [DOE]

of Day 2, chaired by NETL's Kim Nuhfer, are below. ESS 2010 Update Conference - Low Cost Energy Storage - Ted Wiley, Aquion.pdf Ess 2010 Update Conference - Solid State Li Metal...

225

Technology, safety and costs of decommissioning a reference pressurized water reactor power station: Technical support for decommissioning matters related to preparation of the final decommissioning rule  

SciTech Connect (OSTI)

Preparation of the final Decommissioning Rule by the Nuclear Regulatory Commission (NRC) staff has been assisted by Pacific Northwest Laboratory (PNL) staff familiar with decommissioning matters. These efforts have included updating previous cost estimates developed during the series of studies on conceptually decommissioning reference licensed nuclear facilities for inclusion in the Final Generic Environmental Impact Statement (FGEIS) on decommissioning; documenting the cost updates; evaluating the cost and dose impacts of post-TMI-2 backfits on decommissioning; developing a revised scaling formula for estimating decommissioning costs for reactor plants different in size from the reference pressurized water reactor (PWR) described in the earlier study; defining a formula for adjusting current cost estimates to reflect future escalation in labor, materials, and waste disposal costs; and completing a study of recent PWR steam generator replacements to determine realistic estimates for time, costs and doses associated with steam generator removal during decommissioning. This report presents the results of recent PNL studies to provide supporting information in four areas concerning decommissioning of the reference PWR: updating the previous cost estimates to January 1986 dollars; assessing the cost and dose impacts of post-TMI-2 backfits; assessing the cost and dose impacts of recent steam generator replacements; and developing a scaling formula for plants different in size than the reference plant and an escalation formula for adjusting current cost estimates for future escalation.

Konzek, G.J.; Smith, R.I.

1988-07-01T23:59:59.000Z

226

Updated May 22, 2014 Equipment Type Type of Service Requested Est Hrs Est $  

E-Print Network [OSTI]

system 3 $165 "PM" service 1 $55 Research Equipment Support & Engineering Services Core List of Services $ Research Equipment Support & Engineering Services Core List of Services with Time and Cost EstimatesUpdated May 22, 2014 Equipment Type Type of Service Requested Est Hrs Est $ CO2 Incubator

227

Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup, and Oxygen Separation Equipment; Task 2.3: Sulfur Primer  

SciTech Connect (OSTI)

This deliverable is Subtask 2.3 of Task 2, Gas Cleanup Design and Cost Estimates, of NREL Award ACO-5-44027, ''Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup and Oxygen Separation Equipment''. Subtask 2.3 builds upon the sulfur removal information first presented in Subtask 2.1, Gas Cleanup Technologies for Biomass Gasification by adding additional information on the commercial applications, manufacturers, environmental footprint, and technical specifications for sulfur removal technologies. The data was obtained from Nexant's experience, input from GTI and other vendors, past and current facility data, and existing literature.

Nexant Inc.

2006-05-01T23:59:59.000Z

228

Systematic Approach for Decommissioning Planning and Estimating  

SciTech Connect (OSTI)

Nuclear facility decommissioning, satisfactorily completed at the lowest cost, relies on a systematic approach to the planning, estimating, and documenting the work. High quality information is needed to properly perform the planning and estimating. A systematic approach to collecting and maintaining the needed information is recommended using a knowledgebase system for information management. A systematic approach is also recommended to develop the decommissioning plan, cost estimate and schedule. A probabilistic project cost and schedule risk analysis is included as part of the planning process. The entire effort is performed by a experienced team of decommissioning planners, cost estimators, schedulers, and facility knowledgeable owner representatives. The plant data, work plans, cost and schedule are entered into a knowledgebase. This systematic approach has been used successfully for decommissioning planning and cost estimating for a commercial nuclear power plant. Elements of this approach have been used for numerous cost estimates and estimate reviews. The plan and estimate in the knowledgebase should be a living document, updated periodically, to support decommissioning fund provisioning, with the plan ready for use when the need arises.

Dam, A. S.

2002-02-26T23:59:59.000Z

229

Uncertainty and variability in updated estimates of potential dose and risk at a US Nuclear Test Site - Bikini Atoll  

SciTech Connect (OSTI)

Uncertainty and interindividual variability were assessed in estimated doses for a rehabilitation scenario for Bikini Island at Bikini Atoll, in which the top 40 cm of soil would be removed in the housing and village area, and the rest of the island would be treated with potassium fertilizer, prior to an assumed resettlement date of 1999. Doses were estimated for ingested {sup 137}Cs and {sup 90}Sr, external gamma-exposure, and inhalation+ingestion of {sup 241}Am + {sup 239+240}Pu. Two dietary scenarios were considered: imported foods are available (IA); imported foods are unavailable with only local foods consumed (IUA). After {approximately}5 y of Bikini residence under either IA or IUA assumptions, upper and lower 95% confidence limits on interindividual variability in calculated dose were estimated to lie within a {approximately}threefold factor of its in population-average value; upper and lower 95% confidence limits on uncertainty in calculated dose were estimated to lie within a {approximately}twofold factor of its expected value. For reference, the expected values of population-average dose at age 70 y were estimated to be 16 and 52 mSv under IA and IUA dietary assumptions, respectively. Assuming that 200 Bikini resettlers would be exposed to local foods (under both IA and IUA assumptions), the maximum 1-y dose received by any Bikini resident is most likely to be approximately 2 and 8 mSv under the IA and IUA assumptions, respectively. Under the most likely dietary scenario, involving access to imported foods, this analysis indicates that it is most likely that no additional cancer fatalities (above those normally expected) would arise from the increased radiation exposures considered. 33 refs., 4 figs., 4 tabs.

Bogen, K.T.; Conrado, C.L.; Robison, W.L. [Lawrence Livermore National Lab., CA (United States)

1997-07-01T23:59:59.000Z

230

The economics of alternative fuel cycles on sodium-cooled fast reactors and uncertainty and sensitivity analysis of cost estimates  

E-Print Network [OSTI]

Previous work was done to create a baseline capital cost model for the SFR in which case studies were performed to identify ways to decrease the capital costs while maintaining safety and performance. This thesis expands ...

Russo, Genevieve V. (Genevieve Virgina)

2010-01-01T23:59:59.000Z

231

Rough order of magnitude cost estimate for immobilization of 18.2 MT of plutonium using existing facilities at the Savannah River site: alternatives 3A/5A/6A/6B/7A/9A  

SciTech Connect (OSTI)

The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 18.2 metric tons (nominal) of plutonium using ceramic in a new facility at Savannah River Site (SRS).

DiSabatino, A., LLNL

1998-06-01T23:59:59.000Z

232

A Stochastic Unit-Commitment Model to Estimate the Costs of Changing Power Plant Operation under High Amounts of Intermittent Wind Power  

E-Print Network [OSTI]

) a market for district heating and process heat. Time series for the wind power production rely on timeA Stochastic Unit-Commitment Model to Estimate the Costs of Changing Power Plant Operation under High Amounts of Intermittent Wind Power Integration Meibom, P.1 , Brand, H.2 , Barth, R.2 and Weber, C

233

Estimating Methods  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Based on the project's scope, the purpose of the estimate, and the availability of estimating resources, the estimator can choose one or a combination of techniques when estimating an activity or project. Estimating methods, estimating indirect and direct costs, and other estimating considerations are discussed in this chapter.

1997-03-28T23:59:59.000Z

234

Technology, safety and costs of decommissioning a reference boiling water reactor power station: Technical support for decommissioning matters related to preparation of the final decommissioning rule  

SciTech Connect (OSTI)

Preparation of the final Decommissioning Rule by the Nuclear Regulatory Commission (NRC) staff has been assisted by Pacific Northwest Laboratory (PNL) staff familiar with decommissioning matters. These efforts have included updating previous cost estimates developed during the series of studies of conceptually decommissioning reference licensed nuclear facilities for inclusion in the Final Generic Environmental Impact Statement (FGEIS) on decommissioning; documenting the cost updates; evaluating the cost and dose impacts of post-TMI-2 backfits on decommissioning; developing a revised scaling formula for estimating decommissioning costs for reactor plants different in size from the reference boiling water reactor (BWR) described in the earlier study; and defining a formula for adjusting current cost estimates to reflect future escalation in labor, materials, and waste disposal costs. This report presents the results of recent PNL studies to provide supporting information in three areas concerning decommissioning of the reference BWR: updating the previous cost estimates to January 1986 dollars; assessing the cost and dose impacts of post-TMI-2 backfits; and developing a scaling formula for plants different in size than the reference plant and an escalation formula for adjusting current cost estimates for future escalation.

Konzek, G.J.; Smith, R.I.

1988-07-01T23:59:59.000Z

235

Joint U.S./Russian Study on the Development of a Preliminary Cost Estimate of the SAFSTOR Decommissioning Alternative for the Leningrad Nuclear Power Plant Unit #1  

SciTech Connect (OSTI)

The objectives of the two joint Russian/U.S. Leningrad Nuclear Power Plant (NPP) Unit #1 studies were the development of a safe, technically feasible, economically acceptable decom missioning strategy, and the preliminary cost evaluation of the developed strategy. The first study, resulting in the decommissioning strategy, was performed in 1996 and 1997. The preliminary cost estimation study, described in this report, was performed in 1997 and 1998. The decommissioning strategy study included the analyses of three basic RBM.K decommission- ing alternatives, refined for the Leningrad NPP Unit #1. The analyses included analysis of the requirements for the planning and preparation as well as the decommissioning phases.

SM Garrett

1998-09-28T23:59:59.000Z

236

Activity Based Costing  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Activity Based Costing (ABC) is method for developing cost estimates in which the project is subdivided into discrete, quantifiable activities or a work unit. This chapter outlines the Activity Based Costing method and discusses applicable uses of ABC.

1997-03-28T23:59:59.000Z

237

Reformulated gasoline: Costs and refinery impacts  

SciTech Connect (OSTI)

Studies of reformulated gasoline (RFG) costs and refinery impacts have been performed with the Oak Ridge National Laboratory Refinery Yield Model (ORNL-RYM), a linear program which has been updated to blend gasolines to satisfy emissions constraints defined by preliminary complex emissions models. Policy makers may use the reformulation cost knee (the point at which costs start to rise sharply for incremental emissions control) to set emissions reduction targets, giving due consideration to the differences between model representations and actual refining operations. ORNL-RYM estimates that the reformulation cost knee for the US East Coast (PADD I) is about 15.2 cents per gallon with a 30 percent reduction of volatile organic compounds (VOCs). The estimated cost knee for the US Gulf Coast (PADD III) is about 5.5 cents per gallon with a VOC reduction of 35 percent. Reid vapor pressure (RVP) reduction is the dominant VOC reduction mechanism. Even with anti-dumping constraints, conventional gasoline appears to be an important sink which permits RFG to be blended with lower aromatics and sulfur contents in PADD III. In addition to the potentially large sensitivity of RFG production to different emissions models, RFG production is sensitive to the non-exhaust VOC share assumption for a particular VOC model. ORNL-RYM has also been used to estimate the sensitivity of RFG production to the cost of capital; to the RVP requirements for conventional gasoline; and to the percentage of RFG produced in a refining region.

Hadder, G.R.

1994-02-01T23:59:59.000Z

238

Numerical simulation of hydrothermal salt separation process and analysis and cost estimating of shipboard liquid waste disposal  

E-Print Network [OSTI]

Due to environmental regulations, waste water disposal for US Navy ships has become a requirement which impacts both operations and the US Navy's budget. In 2006, the cost for waste water disposal Navy-wide was 54 million ...

Hunt, Andrew Robert

2007-01-01T23:59:59.000Z

239

Validating the Estimated Cost of Saving Water Through Infrastructure Rehabilitation in the Texas Lower Rio Grande Valley  

E-Print Network [OSTI]

Irrigation District No. 2 (San Juan) – 48" Pipeline Replacing Wisconsin Canal – Final.” Subsequent to that report's release, the project was installed and implemented within the District’s water-delivery infrastructure system, with actual construction costs...

Sturdivant, A. W.; Rister, M.; Lacewell, R. D.

240

Cost of a Ride: The Effects of Densities on Fixed-Guideway Transit Ridership and Capital Costs  

E-Print Network [OSTI]

transit – exceeded capital cost estimates by 40% duringfound that capital costs exceeded estimates by an averagesystems. We estimate the total capital cost, average weekday

Guerra, Erick; Cervero, Robert

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

URESC Update  

Broader source: Energy.gov [DOE]

Presentation covers the URESC Update for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

242

Cost of Capital and Regulator’s Preferences: Investigation into a new method of estimating regulatory bias  

E-Print Network [OSTI]

When computing regulated prices, the standard method is the capital asset pricing model (CAPM) which involves the estimation of a single parameter: the beta of the company. Yet, these computational methods fail to take into account any preference...

Sancetta, Alessio; Satchell, Stephen E

243

IEEE TRANSACTIONS ON POWER DELIVERY, VOL. 24, NO. 2, APRIL 2009 961 Estimates of Comparative Costs for  

E-Print Network [OSTI]

assets. I. INTRODUCTION I NCREASING real-estate costs and continued opposition to new transmission lines. MODEL OF AC TRANSMISSION LINES A. Parameters Specifying Electrical Model and Characteristics In this section, we review the electrical model and charac- teristics of AC transmission lines, focusing

Baldick, Ross

244

Hardware and software architecture for state estimation on an experimental low-cost small-scaled helicopter  

E-Print Network [OSTI]

: Low-cost sensors Embedded systems MEMS Unmanned aerial vehicle Autonomous helicopter Data fusion a b contribution of this paper is to detail, at the light of a successful reported autonomous hovering flight of unmanned aerial vehicles (UAV) with various degrees of auton- omy (see Wise, 2004). Prime examples

245

Preliminary design and estimate of capital and operating costs for a production scale application of laser decontamination technology  

SciTech Connect (OSTI)

The application of laser ablation technology to the decontamination of radioactive metals, particularly the surfaces of equipment, is discussed. Included is information related to the design, capital and operating costs, and effectiveness of laser ablation technology, based on commercial excimer and Nd:YAG lasers, for the decontamination of production scale equipment.

Pang, Ho-ming; Edelson, M.C.

1994-08-06T23:59:59.000Z

246

Updated U.S. Geothermal Supply Curve  

SciTech Connect (OSTI)

This paper documents the approach used to update the U.S. geothermal supply curve. The analysis undertaken in this study estimates the supply of electricity generation potential from geothermal resources in the United States and the levelized cost of electricity (LCOE), capital costs, and operating and maintenance costs associated with developing these geothermal resources. Supply curves were developed for four categories of geothermal resources: identified hydrothermal (6.4 GWe), undiscovered hydrothermal (30.0 GWe), near-hydrothermal field enhanced geothermal systems (EGS) (7.0 GWe) and deep EGS (15,900 GWe). Two cases were considered: a base case and a target case. Supply curves were generated for each of the four geothermal resource categories for both cases. For both cases, hydrothermal resources dominate the lower cost range of the combined geothermal supply curve. The supply curves indicate that the reservoir performance improvements assumed in the target case could significantly lower EGS costs and greatly increase EGS deployment over the base case.

Augustine, C.; Young, K. R.; Anderson, A.

2010-02-01T23:59:59.000Z

247

T ti E St S tTetiaroa Energy Storage System Estimated ZBB Zinc Bromide Battery Performance and Costs  

E-Print Network [OSTI]

://rael.berkeley.edu 6Modeled 455kW gen set output power #12;Alte nati e Diesel Si ingAlternative Diesel Sizing://rael.berkeley.edu 1 #12;Island Load and DieselIsland Load and Diesel Generation Assumptions #12;Estimated Elect ical: Average daily energy use: 5,698 kWh d d 23 k Average power demand: 237 kW Peak power demand: 427 kW Load

Kammen, Daniel M.

248

Estimate of Cost-Effective Potential for Minimum Efficiency Performance Standards in 13 Major World Economies Energy Savings, Environmental and Financial Impacts  

E-Print Network [OSTI]

inclusion of the social cost of carbon impact the evaluationinclusion of the social cost of carbon impact the evaluation

Letschert, Virginie E.

2013-01-01T23:59:59.000Z

249

Direct/Indirect Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter provides recommended categories for direct and indirect elements developed by the Committee for Cost Methods Development (CCMD) and describes various estimating techniques for direct and indirect costs.

1997-03-28T23:59:59.000Z

250

Spent fuel disassembly hardware and other non-fuel bearing components: characterization, disposal cost estimates, and proposed repository acceptance requirements  

SciTech Connect (OSTI)

There are two categories of waste considered in this report. The first is the spent fuel disassembly (SFD) hardware. This consists of the hardware remaining after the fuel pins have been removed from the fuel assembly. This includes end fittings, spacer grids, water rods (BWR) or guide tubes (PWR) as appropriate, and assorted springs, fasteners, etc. The second category is other non-fuel-bearing (NFB) components the DOE has agreed to accept for disposal, such as control rods, fuel channels, etc., under Appendix E of the standard utiltiy contract (10 CFR 961). It is estimated that there will be approximately 150 kg of SFD and NFB waste per average metric ton of uranium (MTU) of spent uranium. PWR fuel accounts for approximately two-thirds of the average spent-fuel mass but only 50 kg of the SFD and NFB waste, with most of that being spent fuel disassembly hardware. BWR fuel accounts for one-third of the average spent-fuel mass and the remaining 100 kg of the waste. The relatively large contribution of waste hardware in BWR fuel, will be non-fuel-bearing components, primarily consisting of the fuel channels. Chapters are devoted to a description of spent fuel disassembly hardware and non-fuel assembly components, characterization of activated components, disposal considerations (regulatory requirements, economic analysis, and projected annual waste quantities), and proposed acceptance requirements for spent fuel disassembly hardware and other non-fuel assembly components at a geologic repository. The economic analysis indicates that there is a large incentive for volume reduction.

Luksic, A.T.; McKee, R.W.; Daling, P.M.; Konzek, G.J.; Ludwick, J.D.; Purcell, W.L.

1986-10-01T23:59:59.000Z

251

On-site vs off-site management of environmental restoration waste: A cost effectiveness analysis  

SciTech Connect (OSTI)

The Sandia National Laboratories Environmental Restoration Project is expected to generate relatively large volumes of hazardous waste as a result of cleanup operations. These volumes will exceed the Laboratories existing waste management capacity. This paper presents four options for managing remediation wastes, including three alternatives for on-site waste management utilizing a corrective action management unit (CAMU). Costs are estimated for each of the four options based on current volumetric estimates of hazardous waste. Cost equations are derived for each of the options with the variables being waste volumes, the major unknowns in the analysis. These equations provide a means to update cost estimates as volume estimates change. This approach may be helpful to others facing similar waste management decisions.

Morse, M.A. [Terradigm, Inc., Albuquerque, NM (United States); Aamodt, P.L. [Los Alamos National Lab., NM (United States); Cox, W.B. [Sandia National Labs., Albuquerque, NM (United States)

1996-02-01T23:59:59.000Z

252

Texas Tech University Energy Savings Program July 2009 Update  

E-Print Network [OSTI]

from the previous year normalized to current energy costs and campus square footage. For the first Program for four energy projects. 1) AHU VFD Project ­ Final cost of $558,904 with a payback of 5.2 yearsTexas Tech University Energy Savings Program July 2009 Update The Texas Tech Energy Savings Update

Zhuang, Yu

253

Texas Tech University Energy Savings Program July 2011 Update  

E-Print Network [OSTI]

from the previous year normalized to current energy costs and campus square footage. Through the Third energy demand upon the university buildings. Cogeneration steam, provided at no cost to the universityTexas Tech University Energy Savings Program July 2011 Update The Texas Tech Energy Savings Update

Zhuang, Yu

254

Determining the Lowest-Cost Hydrogen Delivery Mode  

E-Print Network [OSTI]

Costs to Estimate Hydrogen Pipeline Costs. 2004, ITS-Davis:hydrogen. The cost of hydrogen pipeline delivery depends onCosts to Estimate Hydrogen Pipeline Costs. 2004, ITS-Davis:

Yang, Christopher; Ogden, Joan M

2008-01-01T23:59:59.000Z

255

Roadway Improvement Project Cost Allocation  

E-Print Network [OSTI]

Roadway Improvement Project Cost Allocation CTS 21st Annual Transportation Research Conference costs #12;Potential Applications · Roadway Project Feasibility Studies ­ Identified potential roadway infrastructure improvement ­ Documentation of estimated project costs ­ Determine property assessments

Minnesota, University of

256

RCRA/UST, superfund, and EPCRA hotline training module. Introduction to toxics release inventory: Estimating releases (EPCRA section 313; 40 CFR part 372). Updated as of November 1995  

SciTech Connect (OSTI)

The module provides an overview of general techniques that owners and operators of reporting facilities may use to estimate their toxic chemical releases. It exlains the basic release estimation techniques used to determine the chemical quantities reported on the Form R and uses those techniques, along with fundamental chemical or physical principles and properties, to estimate releases of listed toxic chemicals. It converts units of mass, volume, and time. It states the rules governing significant figures and rounding techniques, and references general and industry-specific estimation documents.

NONE

1996-03-01T23:59:59.000Z

257

Development of a Preliminary Decommissioning Plan Following the International Structure for Decommissioning Costing (ISDC) of Nuclear Installations - 13361  

SciTech Connect (OSTI)

The International Structure for Decommissioning Costing (ISDC) of Nuclear Installations, published by OECD/NEA, IAEA and EC is intended to provide a uniform list of cost items for decommissioning projects and provides a standard format that permits international cost estimates to be compared. Candesco and DECOM have used the ISDC format along with two costing codes, OMEGA and ISDCEX, developed from the ISDC by DECOM, in three projects: the development of a preliminary decommissioning plan for a multi-unit CANDU nuclear power station, updating the preliminary decommissioning cost estimates for a prototype CANDU nuclear power station and benchmarking the cost estimates for CANDU against the cost estimates for other reactor types. It was found that the ISDC format provides a well defined and transparent basis for decommissioning planning and cost estimating that assists in identifying gaps and weaknesses and facilitates the benchmarking against international experience. The use of the ISDC can also help build stakeholder confidence in the reliability of the plans and estimates and the adequacy of decommissioning funding. (authors)

Moshonas Cole, Katherine; Dinner, Julia; Grey, Mike [Candesco - A Division of Kinectrics Inc, 26 Wellington E 3rd floor, Toronto, Ontario, M5E 1S2 (Canada)] [Candesco - A Division of Kinectrics Inc, 26 Wellington E 3rd floor, Toronto, Ontario, M5E 1S2 (Canada); Daniska, Vladimir [DECOM a.s., Sibirska 1, 917 01 Trnava (Slovakia)] [DECOM a.s., Sibirska 1, 917 01 Trnava (Slovakia)

2013-07-01T23:59:59.000Z

258

Changing the Climate: Looking Towards a More Cost Effective,...  

Broader source: Energy.gov (indexed) [DOE]

updated "National Action Plan Vision for 2025: A Framework for Change." Changing the Climate: Looking Towards a More Cost Effective, Energy Efficient Future, November 18, 2008...

259

The Cost of Superconducting Magnets as a Function of Stored Energy and Design Magnetic Induction Times the Field Volume  

SciTech Connect (OSTI)

By various theorems one can relate the capital cost of superconducting magnets to the magnetic energy stored within that magnet. This is particularly true for magnet where the cost is dominated by the structure needed to carry the magnetic forces. One can also relate the cost of the magnet to the product of the magnetic induction and the field volume. The relationship used to estimate the cost the magnet is a function of the type of magnet it is. This paper updates the cost functions given in two papers that were published in the early 1990 s. The costs (escalated to 2007 dollars) of large numbers of LTS magnets are plotted against stored energy and magnetic field time field volume. Escalated costs for magnets built since the early 1990 s are added to the plots.

Green, Mike; Green, M.A.; Strauss, B.P.

2007-08-27T23:59:59.000Z

260

Estimation of ship construction costs  

E-Print Network [OSTI]

Since the end of the Cold War naval procurement for the US Navy has seen a dramatic decrease. This decrease in defense spending has placed existing programs under more scrutiny than previous years. As a result there is ...

Miroyannis, Aristides

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Estimated Cost Description Determination Date:  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecord ofESPCof EnergyHouse Environmental

262

U.S. Department of Energy Hydrogen Storage Cost Analysis  

SciTech Connect (OSTI)

The overall objective of this project is to conduct cost analyses and estimate costs for on- and off-board hydrogen storage technologies under development by the U.S. Department of Energy (DOE) on a consistent, independent basis. This can help guide DOE and stakeholders toward the most-promising research, development and commercialization pathways for hydrogen-fueled vehicles. A specific focus of the project is to estimate hydrogen storage system cost in high-volume production scenarios relative to the DOE target that was in place when this cost analysis was initiated. This report and its results reflect work conducted by TIAX between 2004 and 2012, including recent refinements and updates. The report provides a system-level evaluation of costs and performance for four broad categories of on-board hydrogen storage: (1) reversible on-board metal hydrides (e.g., magnesium hydride, sodium alanate); (2) regenerable off-board chemical hydrogen storage materials(e.g., hydrolysis of sodium borohydride, ammonia borane); (3) high surface area sorbents (e.g., carbon-based materials); and 4) advanced physical storage (e.g., 700-bar compressed, cryo-compressed and liquid hydrogen). Additionally, the off-board efficiency and processing costs of several hydrogen storage systems were evaluated and reported, including: (1) liquid carrier, (2) sodium borohydride, (3) ammonia borane, and (4) magnesium hydride. TIAX applied a â��bottom-upâ� costing methodology customized to analyze and quantify the processes used in the manufacture of hydrogen storage systems. This methodology, used in conjunction with DFMA�® software and other tools, developed costs for all major tank components, balance-of-tank, tank assembly, and system assembly. Based on this methodology, the figure below shows the projected on-board high-volume factory costs of the various analyzed hydrogen storage systems, as designed. Reductions in the key cost drivers may bring hydrogen storage system costs closer to this DOE target. In general, tank costs are the largest component of system cost, responsible for at least 30 percent of total system cost, in all but two of the 12 systems. Purchased BOP cost also drives system cost, accounting for 10 to 50 percent of total system cost across the various storage systems. Potential improvements in these cost drivers for all storage systems may come from new manufacturing processes and higher production volumes for BOP components. In addition, advances in the production of storage media may help drive down overall costs for the sodium alanate, SBH, LCH2, MOF, and AX-21 systems.

Law, Karen; Rosenfeld, Jeffrey; Han, Vickie; Chan, Michael; Chiang, Helena; Leonard, Jon

2013-03-11T23:59:59.000Z

263

Validating the Estimated Cost of Saving Water Through Infrastructure Rehabilitation in the Texas Lower Rio Grande Valley (Hidalgo County Irrigation District No. 1)  

E-Print Network [OSTI]

A Case Study Using Actual Construction Costs for the Curry Main Pipeline Project, Hidalgo County Irrigation District No. 1 (Edinburg)...

Lacewell, R. D.; Rister, M.; Sturdivant, A. W.

264

Winter Heating Fuels Update  

Gasoline and Diesel Fuel Update (EIA)

Heating Fuels Update For: Congressional Briefings October 20, 2014 | Washington, DC By U.S. Energy Information Administration Winter Heating Fuels Update October 20, 2014 |...

265

Evaluation of Global Onshore Wind Energy Potential and Generation Costs  

SciTech Connect (OSTI)

In this study, we develop an updated global estimate of onshore wind energy potential using reanalysis wind speed data, along with updated wind turbine technology performance and cost assumptions as well as explicit consideration of transmission distance in the calculation of transmission costs. We find that wind has the potential to supply a significant portion of world energy needs, although this potential varies substantially by region as well as with assumptions such as on what types of land can be used to site wind farms. Total global wind potential under central assumptions is estimated to be approximately 89 petawatt hours per year at less than 9 cents/kWh with substantial regional variations. One limitation of global wind analyses is that the resolution of current global wind speed reanalysis data can result in an underestimate of high wind areas. A sensitivity analysis of eight key parameters is presented. Wind potential is sensitive to a number of input parameters, particularly those related to land suitability and turbine density as well as cost and financing assumptions which have important policy implications. Transmission cost has a relatively small impact on total wind costs, changing the potential at a given cost by 20-30%. As a result of sensitivities studied here we suggest that further research intended to inform wind supply curve development focus not purely on physical science, such as better resolved wind maps, but also on these less well-defined factors, such as land-suitability, that will also have an impact on the long-term role of wind power.

Zhou, Yuyu; Luckow, Patrick; Smith, Steven J.; Clarke, Leon E.

2012-06-20T23:59:59.000Z

266

Factors Impacting Decommissioning Costs - 13576  

SciTech Connect (OSTI)

The Electric Power Research Institute (EPRI) studied United States experience with decommissioning cost estimates and the factors that impact the actual cost of decommissioning projects. This study gathered available estimated and actual decommissioning costs from eight nuclear power plants in the United States to understand the major components of decommissioning costs. Major costs categories for decommissioning a nuclear power plant are removal costs, radioactive waste costs, staffing costs, and other costs. The technical factors that impact the costs were analyzed based on the plants' decommissioning experiences. Detailed cost breakdowns by major projects and other cost categories from actual power plant decommissioning experiences will be presented. Such information will be useful in planning future decommissioning and designing new plants. (authors)

Kim, Karen; McGrath, Richard [Electric Power Research Institute, 3420 Hillview Ave., Palo Alto, California (United States)] [Electric Power Research Institute, 3420 Hillview Ave., Palo Alto, California (United States)

2013-07-01T23:59:59.000Z

267

Realized and prospective impacts of U.S. energy efficiency standards for residential appliances: 2004 update  

SciTech Connect (OSTI)

This study estimated energy, environmental and consumer economic impacts of U.S. federal residential energy efficiency standards that became effective in the 1988-2001 period or will take effect by the end of 2007. These standards have been the subject of in-depth analyses conducted as part of DOE's standards rulemaking process. This study drew on those analyses, but updated certain data and developed a common framework and assumptions for all of the products in order to estimate realized impacts and to update projected impacts. We estimate that the considered standards will reduce residential primary energy consumption and CO{sub 2} emissions in 2020 by 8% compared to the levels expected without any standards. They will save a cumulative total of 34 quads by 2020, and 54 quads by 2030. The estimated cumulative net present value of consumer benefit amounts to $93 billion by 2020, and grows to $125 billion by 2030. The overall benefit/cost ratio of cumulative consumer impacts is 2.45 to 1. While the results of this study are subject to a fair degree of uncertainty, we believe that the general conclusions--DOE's energy efficiency standards save significant quantities of energy (and associated carbon emissions) and reduce consumers' net costs--are robust.

Meyers, Stephen; McMahon, James; McNeil, Michael

2005-06-24T23:59:59.000Z

268

Cost Analysis of Hydrogen Storage Systems  

Broader source: Energy.gov (indexed) [DOE]

Results - Do Not Cite Hydrogen Storage Sodium Alanate Bottom-up BOP Cost DFMA software is used to estimate balance of plant (BOP) component costs based on material,...

269

Driltac (Drilling Time and Cost Evaluation)  

SciTech Connect (OSTI)

The users manual for the drill tech model for estimating the costs of geothermal wells. The report indicates lots of technical and cost detail. [DJE-2005

None

1986-08-01T23:59:59.000Z

270

Texas Tech University Energy Savings Program May 2008 Update  

E-Print Network [OSTI]

costs and campus square footage. Through the second quarter of FY08 the campus consumed 97.48 kbtu/sq ftTexas Tech University Energy Savings Program May 2008 Update The Texas Tech Energy Savings Update Agencies. Energy numbers come from the Energy Report filed with SECO semi-annually. Energy consumption

Gelfond, Michael

271

Texas Tech University Energy Savings Program April 2011 Update  

E-Print Network [OSTI]

from the previous year normalized to current energy costs and campus square footage. Through the SecondTexas Tech University Energy Savings Program April 2011 Update The Texas Tech Energy Savings Update Agencies. A. Energy Goals 1. University Energy Use Energy units are converted to thousands of BTUs per

Gelfond, Michael

272

Texas Tech University Energy Savings Program April 2010 Update  

E-Print Network [OSTI]

from the previous year normalized to current energy costs and campus square footage. For first twoTexas Tech University Energy Savings Program April 2010 Update The Texas Tech Energy Savings Update Agencies. A. Energy Goals 1. Campus Energy Use (E&G) Energy units are converted to thousands of BTUs per

Zhuang, Yu

273

Texas Tech University Energy Savings Program July 2009 Update  

E-Print Network [OSTI]

from the previous year normalized to current energy costs and campus square footage. For the firstTexas Tech University Energy Savings Program July 2009 Update The Texas Tech Energy Savings Update Agencies. A. Energy Goals 1. Campus Energy Use (E&G) Energy units are converted to thousands of BTUs per

Gelfond, Michael

274

Texas Tech University Energy Savings Program July 2010 Update  

E-Print Network [OSTI]

from the previous year normalized to current energy costs and campus square footage. For first threeTexas Tech University Energy Savings Program July 2010 Update The Texas Tech Energy Savings Update Agencies. A. Energy Goals 1. Campus Energy Use (E&G) Energy units are converted to thousands of BTUs per

Zhuang, Yu

275

Weekly Update  

U.S. Energy Information Administration (EIA) Indexed Site

total inventories as of the end of October, to be published in the 4th Quarter Short Term Energy Outlook, is slightly more than 2,900 Bcf. In the Consuming East, AGA's estimate for...

276

Determining the lowest-cost hydrogen delivery mode  

E-Print Network [OSTI]

costs to estimate hydrogen pipeline costs. Davis, CA: ITS-hydrogen. The cost of hydrogen pipeline delivery de- pendshydrogen trucks, and hydrogen pipelines, were devel- oped

Yang, Christopher; Ogden, Joan M

2007-01-01T23:59:59.000Z

277

Estimate of Cost-Effective Potential for Minimum Efficiency Performance Standards in 13 Major World Economies Energy Savings, Environmental and Financial Impacts  

E-Print Network [OSTI]

systems for which heat pump water heaters are found to beachieved by 2030. Heat-pump water heaters, which represent aU.S. and the EU. Heat-pump water heaters have a high cost

Letschert, Virginie E.

2013-01-01T23:59:59.000Z

278

Hydrogen refueling station costs in Shanghai  

E-Print Network [OSTI]

total installed capital cost (TIC) 1% Of TIC 25% Estimate ofcost estimates for six station types SMR 100 a Equipment capital

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2007-01-01T23:59:59.000Z

279

HPI construction boxscore update  

SciTech Connect (OSTI)

Information is given on construction projects in the petroleum industry worldwide. Information includes company name, plant site, project type, capacity, estimated cost, status of the project, licensor, engineering firm, and contractor. Typical projects include: refinery processes, pollution abatement projects, ether production, petrochemical production, natural gas plants, and sulfur recovery. Others include: cogeneration, coal gasification, control/information systems, and lubricant production. The data are sorted by region: USA, Canada, Other Western hemisphere, Europe, Africa, Middle East, Far East, and Australia.

Not Available

1994-06-01T23:59:59.000Z

280

LIFE Cost of Electricity, Capital and Operating Costs  

SciTech Connect (OSTI)

Successful commercialization of fusion energy requires economic viability as well as technical and scientific feasibility. To assess economic viability, we have conducted a pre-conceptual level evaluation of LIFE economics. Unit costs are estimated from a combination of bottom-up costs estimates, working with representative vendors, and scaled results from previous studies of fission and fusion plants. An integrated process model of a LIFE power plant was developed to integrate and optimize unit costs and calculate top level metrics such as cost of electricity and power plant capital cost. The scope of this activity was the entire power plant site. Separately, a development program to deliver the required specialized equipment has been assembled. Results show that LIFE power plant cost of electricity and plant capital cost compare favorably to estimates for new-build LWR's, coal and gas - particularly if indicative costs of carbon capture and sequestration are accounted for.

Anklam, T

2011-04-14T23:59:59.000Z

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Cost analysis guidelines  

SciTech Connect (OSTI)

The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy`s (DOE`s) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies.

Strait, R.S.

1996-01-10T23:59:59.000Z

282

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

283

Techno-Economic Models for Carbon Dioxide Compression, Transport, and Storage & Correlations for Estimating Carbon Dioxide Density and Viscosity  

E-Print Network [OSTI]

Ogden models use capital cost estimates from Skovholt’s 1993are below average but estimate capital costs that are abovediameter, it estimates capital cost below the average.

McCollum, David L; Ogden, Joan M

2006-01-01T23:59:59.000Z

284

Societal lifetime cost of hydrogen fuel cell vehicles  

E-Print Network [OSTI]

Fuel-cell system cost estimate Fuel cell performance andsignificantly affect the cost of fuel cell stack. In aTo estimate how the costs of fuel-cell system components

Sun, Yongling; Ogden, J; Delucchi, Mark

2010-01-01T23:59:59.000Z

285

Decommissioning Unit Cost Data  

SciTech Connect (OSTI)

The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for decommissioning at other facilities with similar equipment and labor costs. It also provides techniques for extracting information from limited data using extrapolation and interpolation techniques.

Sanford, P. C.; Stevens, J. L.; Brandt, R.

2002-02-26T23:59:59.000Z

286

Cost per-User as Key Factor in Project Prioritization: A Case Study of the San Francisco Bay Area  

E-Print Network [OSTI]

The total estimated investment cost of network-related. ll0Vdistribution of capital investment costs and consequentlyThe total estimated investment cost of service-related

Nuworsoo, Cornelius; Parks, Kamala; Deakin, Elizabeth

2006-01-01T23:59:59.000Z

287

Estimating the potential of controlled plug-in hybrid electric vehicle charging to reduce operational and capacity expansion costs for electric  

E-Print Network [OSTI]

expansion Plug-in hybrid electric vehicles Controlled charging Wind power integration a b s t r a c vehicles (BEVs), create additional electricity demand, resulting in additional air emissions from powerEstimating the potential of controlled plug-in hybrid electric vehicle charging to reduce

Michalek, Jeremy J.

288

Handles Revisited: Optimising Performance and Memory Costs in a Real-Time Collector  

E-Print Network [OSTI]

Handles Revisited: Optimising Performance and Memory Costs in a Real-Time Collector Tomas Kalibera garbage collectors must update all references to ob- jects they move. Updating is a lengthy operation references have been updated which, in a real-time collector, must be done incrementally. One solution

Kent, University of

289

The Cost of Helium Refrigerators and Coolers for SuperconductingDevices as a Function of Cooling at 4 K  

SciTech Connect (OSTI)

This paper is an update of papers written in 1991 and in1997 by Rod Byrns and this author concerning estimating the cost ofrefrigeration for superconducting magnets and cavities. The actual costsof helium refrigerators and coolers (escalated to 2007 dollars) areplotted and compared to a correlation function. A correlation functionbetween cost and refrigeration at 4.5 K is given. The capital cost oflarger refrigerators (greater than 10 W at 4.5 K) is plotted as afunction of 4.5-K cooling. The cost of small coolers is plotted as afunction of refrigeration available at 4.2 K. A correlation function forestimating efficiency (percent of Carnot) of both types of refrigeratorsis also given.

Green, Michael A.

2007-08-27T23:59:59.000Z

290

Clean coal technology programs: program update 2006  

SciTech Connect (OSTI)

The purpose of the Clean Coal Technology Programs: Program Update 2006 is to provide an updated status of the DOE commercial-scale demonstrations of clean coal technologies (CCTs). These demonstrations are performed under the Clean Coal Technology Demonstration Program (CCTDP), the Power Plant Improvement Initiative (PPII) and the Clean Coal Power Initiative (CCPI). Program Update 2006 provides 1) a discussion of the role of clean coal technology demonstrations in improving the nation's energy security and reliability, while protecting the environment using the nation's most abundant energy resource - coal; 2) a summary of the funding and costs of the demonstrations; and 3) an overview of the technologies being demonstrated, with fact sheets for demonstration projects that are active, recently completed, withdrawn or ended, including status as of June 30 2006. 4 apps.

NONE

2006-09-15T23:59:59.000Z

291

Clean Coal Technology Programs: Program Update 2009  

SciTech Connect (OSTI)

The purpose of the Clean Coal Technology Programs: Program Update 2009 is to provide an updated status of the U.S. Department of Energy (DOE) commercial-scale demonstrations of clean coal technologies (CCT). These demonstrations have been performed under the Clean Coal Technology Demonstration Program (CCTDP), the Power Plant Improvement Initiative (PPII), and the Clean Coal Power Initiative (CCPI). Program Update 2009 provides: (1) a discussion of the role of clean coal technology demonstrations in improving the nation’s energy security and reliability, while protecting the environment using the nation’s most abundant energy resource—coal; (2) a summary of the funding and costs of the demonstrations; and (3) an overview of the technologies being demonstrated, along with fact sheets for projects that are active, recently completed, or recently discontinued.

None

2009-10-01T23:59:59.000Z

292

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Update is prepared by the Electric Power Operations Team, Office of Electricity, Renewables and Uranium Statistics, U.S. Energy Information Administration (EIA), U.S....

293

Directives Quarterly Updates  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Listings of new Justification Memoranda and new or revised Directives that have been posted to the DOE Directives, Delegations, and Requirements Portal. Updated quarterly.

294

Plans, Updates, Regulatory Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2010 Target Action Level (TAL) Exceedance Report 2011 Updates on Permit Compliance March 7, 2013, NPDES Permit No. NM0030759 - Request for Extenstion to Submit Renewal Application...

295

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

See all Electricity Reports Electricity Monthly Update With Data for September 2014 | Release Date: Nov. 25, 2014 | Next Release Date: Dec. 23, 2014 Previous Issues Issue:...

296

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

See all Electricity Reports Electricity Monthly Update With Data for October 2014 | Release Date: Dec. 23, 2014 | Next Release Date: Jan. 26, 2015 Previous Issues Issue:...

297

Skye, Schell, Washington Update  

Broader source: Energy.gov (indexed) [DOE]

Updates in the Program 13 qualified ESCOs under GSA Schedule 84 * Four Small Business vendors Expanded ECMs to solar (PV) and related HVAC equipment ...

298

Navy Technology Evaluation Update  

Broader source: Energy.gov [DOE]

Presentation covers the Navy Technology Evaluation update at the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

299

Cost Analysis of Fuel Cell Systems for Transportation Compressed Hydrogen and PEM Fuel Cell System  

SciTech Connect (OSTI)

PEMFC technology for transportation must be competitive with internal combustion engine powertrains in a number of key metrics, including performance, life, reliability, and cost. Demonstration of PEMFC cost competitiveness has its own challenges because the technology has not been applied to high volume automotive markets. The key stack materials including membranes, electrodes, bipolar plates, and gas diffusion layers have not been produced in automotive volumes to the exacting quality requirements that will be needed for high stack yields and to the evolving property specifications of high performance automotive stacks. Additionally, balance-of-plant components for air, water, and thermal management are being developed to meet the unique requirements of fuel cell systems. To address the question of whether fuel cells will be cost competitive in automotive markets, the DOE has funded this project to assess the high volume production cost of PEM fuel cell systems. In this report a historical perspective of our efforts in assessment of PEMFC cost for DOE is provided along with a more in-depth assessment of the cost of compressed hydrogen storage is provided. Additionally, the hydrogen storage costs were incorporated into a system cost update for 2004. Assessment of cost involves understanding not only material and production costs, but also critical performance metrics, i.e., stack power density and associated catalyst loadings that scale the system components. We will discuss the factors influencing the selection of the system specification (i.e., efficiency, reformate versus direct hydrogen, and power output) and how these have evolved over time. The reported costs reflect internal estimates and feedback from component developers and the car companies. Uncertainty in the cost projection was addressed through sensitivity analyses.

Eric J. Carlson

2004-10-20T23:59:59.000Z

300

Valuing Rail Transit: Comparing Capital and Operating Costs to Consumer Benefits  

E-Print Network [OSTI]

years gives an annual capital cost estimate of $321 million,further adjust the capital cost estimates for these systemscosts. In order to estimate capital costs for five systems

Guerra, Erick

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

How to Estimate the Value of Service Reliability Improvements  

E-Print Network [OSTI]

and costs per annual kWh. Cost estimates are provided forper event, costs per average kW, costs per un-served kWhinvestments: 1. Cost per un-served kWh is substantially

Sullivan, Michael J.

2010-01-01T23:59:59.000Z

302

Electric Turbo Compounding Technology Update  

Broader source: Energy.gov (indexed) [DOE]

Turbo Compounding Technology Update Electric Turbo Compounding Technology Update 15 August, 2007 Carl Vuk 15 August, 2007 Carl Vuk Electric Turbo Compounding Highlights Electric...

303

EVALUATION OF SPRING OPERATED RELIEF VALVE MAINTENANCE INTERVALS AND EXTENSION OF MAINTENANCE TIMES USING A WEIBULL ANALYSIS WITH MODIFIED BAYESIAN UPDATING  

SciTech Connect (OSTI)

The Savannah River Site (SRS) spring operated pressure relief valve (SORV) maintenance intervals were evaluated using an approach provided by the American Petroleum Institute (API RP 581) for risk-based inspection technology (RBI). In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo Simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating provided by SRS SORV proof testing experience. Initial Weibull parameter estimates were updated as per SRS's historical proof test records contained in the Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD). The API RP 581 methodology was used to estimate the SORV's probability of failing on demand (PFD), and the annual expected risk. The API RP 581 methodology indicates that the current SRS maintenance plan is conservative. Cost savings may be attained in certain mild service applications that present low PFD and overall risk. Current practices are reviewed and recommendations are made for extending inspection intervals. The paper gives an illustration of the inspection costs versus the associated risks by using API RP 581 Risk Based Inspection (RBI) Technology. A cost effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.

Harris, S.; Gross, R.; Mitchell, E.

2011-01-18T23:59:59.000Z

304

Determining the lowest-cost hydrogen delivery mode  

E-Print Network [OSTI]

costs to estimate hydrogen pipeline costs. Davis, CA: ITS-hydrogen trucks, and hydrogen pipelines, were devel- opedFor large amounts of hydrogen, pipeline transmission is pre-

Yang, Christopher; Ogden, Joan M

2007-01-01T23:59:59.000Z

305

Societal lifetime cost of hydrogen fuel cell vehicles  

E-Print Network [OSTI]

Mass Production Cost Estimation for Direct H2 PEM Fuel CellCost Analysis of Fuel Cell Systems for Transportation - Compressed Hydrogen and PEM

Sun, Yongling; Ogden, J; Delucchi, Mark

2010-01-01T23:59:59.000Z

306

Updated U.S. Geothermal Supply Characterization  

SciTech Connect (OSTI)

This paper documents the approach taken to characterize and represent an updated assessment of U.S. geothermal supply for use in forecasting the penetration of geothermal electrical generation in the National Energy Modeling System (NEMS). This work is motivated by several factors: The supply characterization used as the basis of several recent U.S. Department of Energy (DOE) forecasts of geothermal capacity is outdated; additional geothermal resource assessments have been published; and a new costing tool that incorporates current technology, engineering practices, and associated costs has been released.

Petty, S.; Porro, G.

2007-03-01T23:59:59.000Z

307

Realistic costs of carbon capture  

SciTech Connect (OSTI)

There is a growing interest in carbon capture and storage (CCS) as a means of reducing carbon dioxide (CO2) emissions. However there are substantial uncertainties about the costs of CCS. Costs for pre-combustion capture with compression (i.e. excluding costs of transport and storage and any revenue from EOR associated with storage) are examined in this discussion paper for First-of-a-Kind (FOAK) plant and for more mature technologies, or Nth-of-a-Kind plant (NOAK). For FOAK plant using solid fuels the levelised cost of electricity on a 2008 basis is approximately 10 cents/kWh higher with capture than for conventional plants (with a range of 8-12 cents/kWh). Costs of abatement are found typically to be approximately US$150/tCO2 avoided (with a range of US$120-180/tCO2 avoided). For NOAK plants the additional cost of electricity with capture is approximately 2-5 cents/kWh, with costs of the range of US$35-70/tCO2 avoided. Costs of abatement with carbon capture for other fuels and technologies are also estimated for NOAK plants. The costs of abatement are calculated with reference to conventional SCPC plant for both emissions and costs of electricity. Estimates for both FOAK and NOAK are mainly based on cost data from 2008, which was at the end of a period of sustained escalation in the costs of power generation plant and other large capital projects. There are now indications of costs falling from these levels. This may reduce the costs of abatement and costs presented here may be 'peak of the market' estimates. If general cost levels return, for example, to those prevailing in 2005 to 2006 (by which time significant cost escalation had already occurred from previous levels), then costs of capture and compression for FOAK plants are expected to be US$110/tCO2 avoided (with a range of US$90-135/tCO2 avoided). For NOAK plants costs are expected to be US$25-50/tCO2. Based on these considerations a likely representative range of costs of abatement from CCS excluding transport and storage costs appears to be US$100-150/tCO2 for first-of-a-kind plants and perhaps US$30-50/tCO2 for nth-of-a-kind plants.The estimates for FOAK and NOAK costs appear to be broadly consistent in the light of estimates of the potential for cost reductions with increased experience. Cost reductions are expected from increasing scale, learning on individual components, and technological innovation including improved plant integration. Innovation and integration can both lower costs and increase net output with a given cost base. These factors are expected to reduce abatement costs by approximately 65% by 2030. The range of estimated costs for NOAK plants is within the range of plausible future carbon prices, implying that mature technology would be competitive with conventional fossil fuel plants at prevailing carbon prices.

Al Juaied, Mohammed (Harvard Univ., Cambridge, MA (US). Belfer Center for Science and International Affiaris); Whitmore, Adam (Hydrogen Energy International Ltd., Weybridge (GB))

2009-07-01T23:59:59.000Z

308

Cost of Offshore Wind Energy Charlene Nalubega  

E-Print Network [OSTI]

Cost of Offshore Wind Energy and Industrial Engineering The focus of my research is to estimate the cost of floating offshore wind turbines water as well as on land based wind farms. The specific offshore wind energy case under consideration

Mountziaris, T. J.

309

Costs Associated With Propane Vehicle Fueling Infrastructure  

SciTech Connect (OSTI)

This document is designed to help fleets understand the cost factors associated with propane vehicle fueling infrastructure. It provides an overview of the equipment and processes necessary to develop a propane fueling station and offers estimated cost ranges.

Smith, M.; Gonzales, J.

2014-08-01T23:59:59.000Z

310

The sunk cost effect of time : an exploration and an explanation  

E-Print Network [OSTI]

R. , & Ayton, P. (1999). The sunk cost and concorde effects:1985). The psychology of sunk cost. Organizational Behaviorof success estimates in the sunk cost effect. Journal of

Navarro, Anton Domingo

2007-01-01T23:59:59.000Z

311

Manufacturing Cost Analysis for YSZ-Based FlexCells at Pilot and Full Scale Production Scales  

SciTech Connect (OSTI)

Significant reductions in cell costs must be achieved in order to realize the full commercial potential of megawatt-scale SOFC power systems. The FlexCell designed by NexTech Materials is a scalable SOFC technology that offers particular advantages over competitive technologies. In this updated topical report, NexTech analyzes its FlexCell design and fabrication process to establish manufacturing costs at both pilot scale (10 MW/year) and full-scale (250 MW/year) production levels and benchmarks this against estimated anode supported cell costs at the 250 MW scale. This analysis will show that even with conservative assumptions for yield, materials usage, and cell power density, a cost of $35 per kilowatt can be achieved at high volume. Through advancements in cell size and membrane thickness, NexTech has identified paths for achieving cell manufacturing costs as low as $27 per kilowatt for its FlexCell technology. Also in this report, NexTech analyzes the impact of raw material costs on cell cost, showing the significant increases that result if target raw material costs cannot be achieved at this volume.

Scott Swartz; Lora Thrun; Robin Kimbrell; Kellie Chenault

2011-05-01T23:59:59.000Z

312

Reactor Cost Analysis Brian James  

E-Print Network [OSTI]

Reactor Cost Analysis Brian James Directed Technologies, Inc. 6-7 November 2007 This presentation specification & optimization · Capital cost estimation · Projected hydrogen $/kg #12;Directed Technologies, Inc/WGS Membrane Reactor OTM/ Water-Splitting ANL With WGS #12;Directed Technologies, Inc. 6-7 November 2007 BILIWG

313

Fuel Cell System Cost for Transportation-2008 Cost Estimate (Book)  

SciTech Connect (OSTI)

Independent review prepared for the U.S. Department of Energy (DOE) Hydrogen, Fuel Cells and Infrastructure Technologies (HFCIT) Program Manager.

Not Available

2009-05-01T23:59:59.000Z

314

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecember 2005DepartmentDecemberGlossaryEnergy andActionCoal to Liquids link

315

Supporting Documentation for the 2008 Update to the Insulation Fact Sheet  

SciTech Connect (OSTI)

The Insulation Fact Sheet provides consumers for general guidance and recommended insulation levels for their home. This fact sheet has been on-line since 1995 and this update addresses new insulation materials, as well as updated costs for energy and materials.

Stovall, Therese K [ORNL

2008-02-01T23:59:59.000Z

316

Startup Costs - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and environmental projects, and estimating guidance for startup costs. g4301-1chp8.pdf -- PDF Document, 8 KB Writer: John Makepeace Subjects: Administration Management...

317

Updated Higgs cross section at approximate N$^3$LO  

E-Print Network [OSTI]

We update our estimate of the cross section for Higgs production in gluon fusion at next-to-next-to-next-to-leading order (N$^3$LO) in $\\alpha_s$ in view of the recent full computation of the result in the soft limit for infinite top mass, which determines a previously unknown constant. We briefly discuss the phenomenological implications. Results are available through the updated version of the ggHiggs code.

Marco Bonvini; Richard D. Ball; Stefano Forte; Simone Marzani; Giovanni Ridolfi

2014-07-03T23:59:59.000Z

318

Cost Improvements, Returns to Scale, and Cost Inefficiencies for Real Estate Investment Trusts*  

E-Print Network [OSTI]

) operating efficiencies. We estimate stochastic-frontier, panel-data models specifying a translog cost of the competitive advantage include economies of scale, lower capital costs, and superior sources of capital. Specifying a translog cost function and using 1995 to 2003 data, we estimate a stochastic-frontier panel

Ahmad, Sajjad

319

Policy Flash 2014-37 Update to the Department of Energy Acquisition...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts Policy Flash 2014-37 Update to the Department of Energy Acquisition Guide Chapter 16.2,...

320

Department of Energy Environmental Management cost infrastructure development program: Cost analysis requirements  

SciTech Connect (OSTI)

This report was prepared to support development of the Department of Energy Environmental Management cost infrastructure -- a new capability to independently estimate and analyze costs. Currently, the cost data are reported according to a structure that blends level of effort tasks with product and process oriented tasks. Also. the budgetary inputs are developed from prior year funding authorizations and from contractor-developed parametric estimates that have been adjusted to planned funding levels or appropriations. Consequently, it is difficult for headquarters and field-level activities to use actual cost data and technical requirements to independently assess the costs generated and identify trends, potential cost savings from process improvements, and cost reduction strategies.

Custer, W.R. Jr.; Messick, C.D.

1996-03-31T23:59:59.000Z

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Selective Reporting and the Social Cost of Carbon  

E-Print Network [OSTI]

estimating the social cost of carbon. meta-analysis.cz/scc.Formula for the Social Cost of Carbon. ” Working PaperP. Watkiss (2005): “Social Cost of Carbon: A Closer Look at

Havranek, Tomas; Irsova, Zuzana; Janda, Karel; Zilberman, David

2014-01-01T23:59:59.000Z

322

The costs of environmental regulation in a concentrated industry  

E-Print Network [OSTI]

The typical cost analysis of an environmental regulation consists of an engineering estimate of the compliance costs. In industries where fixed costs are an important determinant of market structure this static analysis ...

Ryan, Stephen

2005-01-01T23:59:59.000Z

323

The Costs of Environmental Regulation in a Concentrated Industry  

E-Print Network [OSTI]

The typical cost analysis of an environmental regulation consists of an engineering estimate of the compliance costs. In industries where fixed costs are an important determinant of market structure, this static analysis ...

Ryan, Stephen

324

External Costs of Transport in the U.S.  

E-Print Network [OSTI]

been quantified. Energy security/oil-importing costs BriefEstimates of energy-security/oil-importing costs by mode (et al. , 2008). Oil-importing “energy-security” costs have

Delucchi, Mark A.; McCubbin, Donald R.

2010-01-01T23:59:59.000Z

325

Weighing the Costs and Benefits of Renewables Portfolio Standards: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network [OSTI]

data, the highest capital cost estimate in the 2010-2015multiply initial capital cost estimates by up to a factor ofand projected wind capital cost estimates from EPRI/DOE

Chen, Cliff; Wiser, Ryan; Bolinger, Mark

2007-01-01T23:59:59.000Z

326

Los Alamos PC estimating system  

SciTech Connect (OSTI)

The Los Alamos Cost Estimating System (QUEST) is being converted to run on IBM personal computers. This very extensive estimating system is capable of supporting cost estimators from many different and varied fields. QUEST does not dictate any fixed method for estimating. QUEST supports many styles and levels of detail estimating. QUEST can be used with or without data bases. This system allows the estimator to provide reports based on levels of detail defined by combining work breakdown structures. QUEST provides a set of tools for doing any type of estimate without forcing the estimator to use any given method. The level of detail in the estimate can be mixed based on the amount of information known about different parts of the project. The system can support many different data bases simultaneously. Estimators can modify any cost in any data base.

Stutz, R.A.; Lemon, G.D.

1987-01-01T23:59:59.000Z

327

Cost estimation of human systems integration  

E-Print Network [OSTI]

Human Systems Integration (HSI) is the interdisciplinary technical and management processes for integrating human considerations within and across all system elements. The goal of this research is to develop a better ...

Liu, Kevin K. (Kevin Kaitan), 1986-

2010-01-01T23:59:59.000Z

328

Title, Location, Document Number Estimated Cost Description  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 th , 2007Timothy RunyonTitle

329

Interruption Cost Estimate Calculator | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 - 429 Throttled (bot load)International AssociationServicesforInterproject

330

Process Equipment Cost Estimation, Final Report  

Office of Scientific and Technical Information (OSTI)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestartNationalSpeeding accessScientific andScientific5$ P80ofl* t , f

331

Air, High Speed Rail, or Highway: A Cost Comparison in the California Corridor  

E-Print Network [OSTI]

these reduced social costs offset rail's high capital and operating costs. The development of cost estimates, any of these three modes. In this study we include estimates of four types of external, social costs design characteristics observed in the California corridor. We estimate rail costs with models adapted

Levinson, David M.

332

Updates - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Updates by Diane Johnson Email Alerts Subscribe to automatic e-mail notification about updates to the portal. Email Alerts...

333

Updating Small Generator Interconnection Procedures for New Market Conditions  

SciTech Connect (OSTI)

Federal and state regulators are faced with the challenge of keeping interconnection procedures updated against a backdrop of evolving technology, new codes and standards, and considerably transformed market conditions. This report is intended to educate policymakers and stakeholders on beneficial reforms that will keep interconnection processes efficient and cost-effective while maintaining a safe and reliable power system.

Coddington, M.; Fox, K.; Stanfield, S.; Varnado, L.; Culley, T.; Sheehan, M.

2012-12-01T23:59:59.000Z

334

Updated 11.17.14 JM UNIVERSITY OF CALIFORNIA  

E-Print Network [OSTI]

Updated 11.17.14 JM UNIVERSITY OF CALIFORNIA OFFICE OF THE CHIEF INVESTMENT OFFICER 1111 BROADWAY of securities or mutual funds to benefit UC Santa Cruz. The UC Office of the Chief Investment Officer provides broker services for securities and mutual fund gifts to the UC Santa Cruz Foundation at no cost. By using

California at Santa Cruz, University of

335

Texas Tech University Energy Savings Program January 2010 Update  

E-Print Network [OSTI]

for the same time period from the previous year normalized to current energy costs and campus square footageTexas Tech University Energy Savings Program January 2010 Update The Texas Tech Energy Savings by State Agencies. A. Energy Goals 1. Campus Energy Use (E&G) Energy units are converted to thousands

Zhuang, Yu

336

Texas Tech University Energy Savings Program October 2009 Update  

E-Print Network [OSTI]

for the same time period from the previous year normalized to current energy costs and campus square footageTexas Tech University Energy Savings Program October 2009 Update The Texas Tech Energy Savings by State Agencies. A. Energy Goals 1. Campus Energy Use (E&G) Energy units are converted to thousands

Gelfond, Michael

337

Texas Tech University Energy Savings Program February 2008 Update  

E-Print Network [OSTI]

consumption for the same time period from the previous year normalized to current energy costs and campusTexas Tech University Energy Savings Program February 2008 Update The Texas Tech Energy Savings by State Agencies. Energy numbers come from the Energy Report filed with SECO semi-annually. Texas Tech

Gelfond, Michael

338

Texas Tech University Energy Savings Program January 2011 Update  

E-Print Network [OSTI]

from the previous year normalized to current energy costs and campus square footage. For the firstTexas Tech University Energy Savings Program January 2011 Update The Texas Tech Energy Savings by State Agencies. A. Energy Goals 1. University Energy Use Energy units are converted to thousands of BTUs

Gelfond, Michael

339

Texas Tech University Energy Savings Program October 2011 Update  

E-Print Network [OSTI]

from the previous year normalized to current energy costs and campus square footage. Through fiscalTexas Tech University Energy Savings Program October 2011 Update The Texas Tech Energy Savings by State Agencies. A. Energy Goals 1. University Energy Use Energy units are converted to thousands of BTUs

Zhuang, Yu

340

Texas Tech University Energy Savings Program August 2008 Update  

E-Print Network [OSTI]

consumption for the same time period from the previous year normalized to current energy costs and campus.7% $(217,100) Total 144.13 142.25 Down 1.3% $163,200 Page 1 of 5 July 2008 Energy Report #12;Since RP 49Texas Tech University Energy Savings Program August 2008 Update The Texas Tech Energy Savings

Gelfond, Michael

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Texas Tech University Energy Savings Program October 2010 Update  

E-Print Network [OSTI]

for the same time period from the previous year normalized to current energy costs and campus square footage Total 15.1357 14.7573 15.5852 3.0% Page 2 of 6 October 2010 Energy Report #12;3. Fleet Fuel ManagementTexas Tech University Energy Savings Program October 2010 Update The Texas Tech Energy Savings

Zhuang, Yu

342

Texas Tech University Energy Savings Program October 2012 Update  

E-Print Network [OSTI]

on energy consumption for the same time period from the previous year normalized to current energy costs,727 Cogeneration Steam 20.06 20.83 Up 3.8% NA Total 165.84 161.01 Down 2.9% $ 194,851 Texas Tech University EnergyTexas Tech University Energy Savings Program October 2012 Update The Texas Tech Energy Savings

Zhuang, Yu

343

Academy Member Annual Update Report 1Academy Member Update Report  

E-Print Network [OSTI]

Academy Member Annual Update Report 1Academy Member Update Report The annual update report is an important activity associated with active membership in the Academy. These reports are due annually questions. A separate document includes the required report format and directions. Please email omerad

344

Program Review Updates and Briefings  

Broader source: Energy.gov [DOE]

You can learn more about the U.S. Department of Energy (DOE) Geothermal Technologies Program by reading its program review updates and program briefings. These updates and briefings feature...

345

On the relation between expected returns and implied cost of capital  

E-Print Network [OSTI]

coef?cient estimate on implied cost of capital to be biased.the implied cost of capital literature estimates of the exestimates of ex ante risk premiums inferred from implied cost of capital

Hughes, John; Liu, Jing; Liu, Jun

2009-01-01T23:59:59.000Z

346

An Assessment of the Near-Term Costs of Hydrogen Refueling Stations and Station Components  

E-Print Network [OSTI]

Installed Capital Figure 4-21: Cost Estimates for 1,000 kg/station. H2Gen’s estimates for capital costs are also lowerestimates and show high variability (26%-117% of capital costs).

Lipman, T E; Weinert, Jonathan X.

2006-01-01T23:59:59.000Z

347

Cash Flow and Discount Rate news estimation: which method to choose?  

E-Print Network [OSTI]

form the VAR method . Implied Cost of Capital estimates byt+1 . TABLE 3: Cost of Capital Estimates by Year Year Numberdifferent estimates of the implied cost of capital. See

Khimich, Natalya V.

2012-01-01T23:59:59.000Z

348

Renewable Portfolio Standards: Costs and Benefits (Poster)  

SciTech Connect (OSTI)

This report summarizes state-level RPS costs to date, and considers how those costs may evolve going forward given scheduled increases in RPS targets and cost containment mechanisms. The report also summarizes RPS benefits estimates, based on published studies for individual states and discusses key methodological considerations.

Bird, L.; Heeter, J.; Barbose, G.; Weaver, S.; Flores, F.; Kuskova-Burns, K.; Wiser, R.

2014-10-01T23:59:59.000Z

349

CAC Update: HFBR and BGRR  

E-Print Network [OSTI]

rod blades and casks has been installed and tested #12;HFBR Update #12;HFBR Update Personnel have been on procedures for completing the work · Drills and dry-runs have been conducted to develop worker proficiency under normal and off-normal conditions #12;HFBR Update Transportation cask Certificates of Compliance

Homes, Christopher C.

350

Richmond Bay Campus: Project Update  

E-Print Network [OSTI]

Coordinate with City of Richmond South Shoreline Area planning #12;Richmond Bay Campus Vision A stateRichmond Bay Campus: Project Update Prepared for the Richmond City Council October 1, 2013 #12 and UCB · City of Richmond Updates · Summary · Questions & Answers #12;LBNL Project Update #12;University

Lee, Jason R.

351

Information Updates: Position/Title  

E-Print Network [OSTI]

Information Updates: Name: Position/Title: Business Mailing Address: Home Mailing Address: Phone of nurse involvement and patient education. She is an active nurse leader that brings thoughtful discussion be a chapter update for upcoming future events and plans for the future. Don't miss this exciting update! Beta

Sheridan, Jennifer

352

Operating Costs for Trucks David Levinson*, Michael Corbett, Maryam Hashami  

E-Print Network [OSTI]

Author Abstract This study estimates the operating costs for commercial vehicle operators in Minnesota, but variable costs change with the level of output. Daniels (1974) divided vehicle operating cost into two different categories, running costs (includes fuel consumption, engine oil consumption, tire costs

Levinson, David M.

353

Is it Worth it? A Comparative Analysis of Cost-Benefit Projections for State Renewables Portfolio Standards  

E-Print Network [OSTI]

most important input to the avoided cost estimate of severalstudies that assume that avoided costs will be effectivelyor implicitly assumed that avoided costs will be primarily

Chen, Cliff; Wiser, Ryan; Bolinger, Mark

2006-01-01T23:59:59.000Z

354

Smart Buildings: Business Case and Action Plan  

E-Print Network [OSTI]

Subtotal  Estimated Investment: Costs, Assumptions and 22   Part 3. Costs, Investment, andresponse. Part 3. Costs, Investment and Savings • Updated

Ehrlich, Paul

2009-01-01T23:59:59.000Z

355

Advanced Fuel Cycle Cost Basis  

SciTech Connect (OSTI)

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

2008-03-01T23:59:59.000Z

356

Advanced Fuel Cycle Cost Basis  

SciTech Connect (OSTI)

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 26 cost modules—24 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, and high-level waste.

D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert

2007-04-01T23:59:59.000Z

357

win0203SelUpdates0203.doc  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquids Reserve Class3a.86,77,1996 N| Updated Feb

358

win0203SelUpdates0303.doc  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquids Reserve Class3a.86,77,1996 N| Updated FebEn

359

WECC and Peak Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WECC and Peak Update Transmission B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-decisional. For Discussion Purposes Only. WECC and Peak Background In the...

360

RESEARCH UPDATE Ecology Division  

E-Print Network [OSTI]

1 RESEARCH UPDATE Ecology Division Biotype has changed its name to Ecotype! Following the re-organisation of Forest Research into five science Divisions and three Support Divisions, the former Woodland Ecology Branches to form the new Ecology Division. We decided to give the divisional newsletter a new name (and

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

State Energy Price System: 1982 update  

SciTech Connect (OSTI)

The State Energy Price System (STEPS) contains estimates of energy prices for ten major fuels (electricity, natural gas, metallurgical coal, steam coal, distillate, motor gasoline, diesel, kerosene/jet fuel, residual fuel, and liquefied petroleum gas), by major end-use sectors (residential, commercial, industrial, transportation, and electric utility), and by state through 1982. Both physical unit prices and prices per million Btu are included in STEPS. Major changes in STEPS data base for 1981 and 1982 are described. The most significant changes in procedures for the updates occur in the residential sector distillate series and the residential sector kerosene series. All physical unit and Btu prices are shown with three significant digits instead of with four significant digits as shown in the original documentation. Details of these and other changes are contained in this report, along with the updated data files. 31 references, 65 tables.

Imhoff, K.L.; Fang, J.M.

1984-10-01T23:59:59.000Z

362

Heliostat cost reduction study.  

SciTech Connect (OSTI)

Power towers are capable of producing solar-generated electricity and hydrogen on a large scale. Heliostats are the most important cost element of a solar power tower plant. Since they constitute {approx} 50% of the capital cost of the plant it is important to reduce heliostat cost as much as possible to improve the economic performance of power towers. In this study we evaluate current heliostat technology and estimate a price of $126/m{sup 2} given year-2006 materials and labor costs for a deployment of {approx}600 MW of power towers per year. This 2006 price yields electricity at $0.067/kWh and hydrogen at $3.20/kg. We propose research and development that should ultimately lead to a price as low as $90/m{sup 2}, which equates to $0.056/kWh and $2.75/kg H{sup 2}. Approximately 30 heliostat and manufacturing experts from the United States, Europe, and Australia contributed to the content of this report during two separate workshops conducted at the National Solar Thermal Test Facility.

Jones, Scott A.; Lumia, Ronald. (University of New Mexico, Albuquerque, NM); Davenport, Roger (Science Applications International Corporation, San Diego, CA); Thomas, Robert C. (Advanced Thermal Systems, Centennial, CO); Gorman, David (Advanced Thermal Systems, Larkspur, CO); Kolb, Gregory J.; Donnelly, Matthew W.

2007-06-01T23:59:59.000Z

363

Updated Costs (June 2011 Basis) for Selected Bituminous Baseline...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 - GEE IGCC without CO 2 capture * Case 2 - GEE IGCC with CO 2 capture * Case 9 - Subcritical PC without CO 2 capture * Case 10 - Subcritical PC with CO 2 capture * Case 11 -...

364

Updated Buildings Sector Appliance and Equipment Costs and Efficiency  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500II Field Emission SEM with EDAX

365

Updated Buildings Sector Appliance and Equipment Costs and Efficiency  

Gasoline and Diesel Fuel Update (EIA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"Click worksheet9,1,50022,3,,,,6,1,,781Title: Telephone:short version) Themonthly4 Oil(EIA)

366

Updated Cost Analysis of Photobiological Hydrogen Production from  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyTheTwo New12.'6/0.2 ...... 13:27Department ofofAvailable

367

Defense waste transportation: cost and logistics studies  

SciTech Connect (OSTI)

Transportation of nuclear wastes from defense programs is expected to significantly increase in the 1980s and 1990s as permanent waste disposal facilities come into operation. This report uses models of the defense waste transportation system to quantify potential transportation requirements for treated and untreated contact-handled transuranic (CH-TRU) wastes and high-level defense wastes (HLDW). Alternative waste management strategies in repository siting, waste retrieval and treatment, treatment facility siting, waste packaging and transportation system configurations were examined to determine their effect on transportation cost and hardware requirements. All cost estimates used 1980 costs. No adjustments were made for future changes in these costs relative to inflation. All costs are reported in 1980 dollars. If a single repository is used for defense wastes, transportation costs for CH-TRU waste currently in surface storage and similar wastes expected to be generated by the year 2000 were estimated to be 109 million dollars. Recovery and transport of the larger buried volumes of CH-TRU waste will increase CH-TRU waste transportation costs by a factor of 70. Emphasis of truck transportation and siting of multiple repositories would reduce CH-TRU transportation costs. Transportation of HLDW to repositories for 25 years beginning in 1997 is estimated to cost $229 M in 1980 costs and dollars. HLDW transportation costs could either increase or decrease with the selection of a final canister configuration. HLDW transportation costs are reduced when multiple repositories exist and emphasis is placed on truck transport.

Andrews, W.B.; Cole, B.M.; Engel, R.L.; Oylear, J.M.

1982-08-01T23:59:59.000Z

368

Cost Accounting System for fusion studies  

SciTech Connect (OSTI)

A Cost Accounting System that is applicable to all magnetic fusion reactor design studies has been developed. This system provides: (1) definitions of the elements of cost and methods for the combination of these elements to form a cost estimate; (2) a Code of Accounts that uses a functional arrangement for identification of the plant components; and (3) definitions and methods to analyze actual cost data so that the data can be directly reported into this Cost Accounting System. The purpose of the Cost Accounting System is to provide the structure for the development of a fusion cost data base and for the development of validated cost estimating procedures. This system has been developed through use at the Fusion Engineering Design Center (FEDC) and has been applied to different confinement concepts (tokamaks and tandem mirrors) and to different types of projects (experimental devices and commercial power plants). The use of this Cost Accounting System by all magnetic fusion projects will promote the development of a common cost data base, allow the direct comparison of cost estimates, and ultimately establish the cost credibility of the program.

Hamilton, W.R.; Keeton, D.C.; Thomson, S.L.

1985-12-01T23:59:59.000Z

369

HTGR Cost Model Users' Manual  

SciTech Connect (OSTI)

The High Temperature Gas-Cooler Reactor (HTGR) Cost Model was developed at the Idaho National Laboratory for the Next Generation Nuclear Plant Project. The HTGR Cost Model calculates an estimate of the capital costs, annual operating and maintenance costs, and decommissioning costs for a high-temperature gas-cooled reactor. The user can generate these costs for multiple reactor outlet temperatures; with and without power cycles, including either a Brayton or Rankine cycle; for the demonstration plant, first of a kind, or nth of a kind project phases; for a single or four-pack configuration; and for a reactor size of 350 or 600 MWt. This users manual contains the mathematical models and operating instructions for the HTGR Cost Model. Instructions, screenshots, and examples are provided to guide the user through the HTGR Cost Model. This model was design for users who are familiar with the HTGR design and Excel. Modification of the HTGR Cost Model should only be performed by users familiar with Excel and Visual Basic.

A.M. Gandrik

2012-01-01T23:59:59.000Z

370

Texas Electricity Update  

E-Print Network [OSTI]

Texas Electricity Update CATEE 2012 Galveston, Texas Brian Lloyd Executive Director Public Utility Commission of Texas October 10, 2012 1 2 Drought Summary May Reserve Margin Report 3 Demand Growth by Region 4 105? Normal... 917 Firm Load Forecast, MW 65,649 68,403 71,692 73,957 75,360 76,483 CATEE 2012 Questions? Brian H. Lloyd Executive Director Public Utility Commission of Texas 512-936-7040 14 ...

Lloyd, B.

2012-01-01T23:59:59.000Z

371

Next Update: November 2013  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia,(Million Barrels) Crude Oil Reserves in Nonproducing ReservoirsYear-Month WeekReserves (Billion Cubic Next Update:

372

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and fuel consumption In this section, we look at the resources used to produce electricity. Generating units are chosen to run primarily on their operating costs, of which...

373

Calculating Costs for Quality of Security Service Evdoxia Spyropoulou  

E-Print Network [OSTI]

utilization costs. The estimated costs can be fed into a resource management system to facilitate the process the design of the QoSS costing demonstration, which we believe is suitable for incorporation into a resource resource availability. As part of the process of estimating efficient task schedules, the RMS must balance

374

Health & Safety Plan Last Updated  

E-Print Network [OSTI]

Health & Safety Plan Last Updated March 2008 1 #12;A. SCOPE AND RESPONSIBILITY....................................................................................................................................... 3 2. Safety and Health Policy...................................................................................................................... 3 4. Safety Coordinator

Anderson, Richard

375

Agricultural and Resource Economics Update  

E-Print Network [OSTI]

Analysis for Evaluating Biofuels. ” ARE Update 11(3) (2008):the RFS conventional biofuels mandate is severely harmingThe first is growth in biofuels demand. Notably, corn

2012-01-01T23:59:59.000Z

376

Agricultural and Resource Economics Update  

E-Print Network [OSTI]

Environmental Impact of Biofuels. ” ARE Update 15(2):9-11.and the Environmental Impact of Biofuels Gal Hochman, Deepakand the Environmental Impact of Biofuels Gal Hochman, Deepak

Lee, Hyunok; Sumner, Daniel A.; Martin, Philip; Hochman, Gal; Rajagopal, Deepak; Zilberman, David

2011-01-01T23:59:59.000Z

377

Progress Update: TRU Waste Shipping  

SciTech Connect (OSTI)

A progress update at the Savannah River Site. A continued effort on shipping TRU waste to WIPP in Carlsbad, New Mexico.

Cody, Tom

2010-01-01T23:59:59.000Z

378

Progress Update: TRU Waste Shipping  

ScienceCinema (OSTI)

A progress update at the Savannah River Site. A continued effort on shipping TRU waste to WIPP in Carlsbad, New Mexico.

Cody, Tom

2012-06-14T23:59:59.000Z

379

Employee Replacement Costs  

E-Print Network [OSTI]

Employee Replacement Costs Arindrajit Dube, Eric Freeman andproperties of employee replacement costs, using a panel2008. We establish that replacement costs are sub- stantial

Dube, Arindrajit; Freeman, Eric; Reich, Michael

2010-01-01T23:59:59.000Z

380

Update of Part 61 Impacts Analysis Methodology. Methodology report. Volume 1  

SciTech Connect (OSTI)

Under contract to the US Nuclear Regulatory Commission, the Envirosphere Company has expanded and updated the impacts analysis methodology used during the development of the 10 CFR Part 61 rule to allow improved consideration of the costs and impacts of treatment and disposal of low-level waste that is close to or exceeds Class C concentrations. The modifications described in this report principally include: (1) an update of the low-level radioactive waste source term, (2) consideration of additional alternative disposal technologies, (3) expansion of the methodology used to calculate disposal costs, (4) consideration of an additional exposure pathway involving direct human contact with disposed waste due to a hypothetical drilling scenario, and (5) use of updated health physics analysis procedures (ICRP-30). Volume 1 of this report describes the calculational algorithms of the updated analysis methodology.

Oztunali, O.I.; Roles, G.W.

1986-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Unit costs of waste management operations  

SciTech Connect (OSTI)

This report provides estimates of generic costs for the management, disposal, and surveillance of various waste types, from the time they are generated to the end of their institutional control. Costs include monitoring and surveillance costs required after waste disposal. Available data on costs for the treatment, storage, disposal, and transportation of spent nuclear fuel and high-level radioactive, low-level radioactive, transuranic radioactive, hazardous, mixed (low-level radioactive plus hazardous), and sanitary wastes are presented. The costs cover all major elements that contribute to the total system life-cycle (i.e., ``cradle to grave``) cost for each waste type. This total cost is the sum of fixed and variable cost components. Variable costs are affected by operating rates and throughput capacities and vary in direct proportion to changes in the level of activity. Fixed costs remain constant regardless of changes in the amount of waste, operating rates, or throughput capacities. Key factors that influence cost, such as the size and throughput capacity of facilities, are identified. In many cases, ranges of values for the key variables are presented. For some waste types, the planned or estimated costs for storage and disposal, projected to the year 2000, are presented as graphics.

Kisieleski, W.E.; Folga, S.M.; Gillette, J.L.; Buehring, W.A.

1994-04-01T23:59:59.000Z

382

1 POSTGRADUATE SCHOLARSHIPS UPDATE -July -August 2014 Postgraduate Scholarships Update  

E-Print Network [OSTI]

- August 2014 ADDRESSENQUIRIESAND YOURCOMPLETEDFORMTO: SCHOLARSHIPSMANAGER ScholarshipsOffice Victoria1 POSTGRADUATE SCHOLARSHIPS UPDATE - July - August 2014 Postgraduate Scholarships Update JulyUniversityofWellington POBox600 Wellington6140 NewZealand PHONE +64-4-4635113 EMAIL scholarships-office@vuw.ac.nz WEBSITE www.victoria

Frean, Marcus

383

Cost per-User as Key Factor in Project Prioritization: A Case Study of the San Francisco Bay Area  

E-Print Network [OSTI]

signi?cant additional costs per ride to existing operations.total estimated investment cost of network-related. ll0V gapwould lower the estimated costs per Affected ride. pmjem was

Nuworsoo, Cornelius; Parks, Kamala; Deakin, Elizabeth

2006-01-01T23:59:59.000Z

384

Vehicle Investment and Operating Costs and Savings for Greenhouse Gas Mitigation Strategies  

Broader source: Energy.gov [DOE]

To help estimate costs of implementing greenhouse gas (GHG) mitigation strategies for vehicles, the table below provides the initial investment, operating costs, and operating savings for each strategy.

385

The Cost of Debt Jules H. van Binsbergen  

E-Print Network [OSTI]

§ This version: January 2008 Abstract We estimate firm-specific cost of corporate debt functions for thousands of debt benefit curves. By integrating the area between the benefit and cost functions we estimate in capital structure policies by studying the signs of estimated slope coefficients for factors such as firm

386

Building America Residential Energy Efficiency Technical Update...  

Energy Savers [EERE]

Residential Energy Efficiency Technical Update Meeting: August 2011 Building America Residential Energy Efficiency Technical Update Meeting: August 2011 On this page, you may link...

387

Energy Storage Systems 2010 Update Conference Presentations ...  

Broader source: Energy.gov (indexed) [DOE]

by SNL's Ross Guttromson, are below. ESS 2010 Update Conference - NYSERDA-DOE Joint Energy Storage Initiative - Georgianne Huff, SNL.pdf ESS 2010 Update Conference - Testing...

388

Energy Storage Systems 2010 Update Conference Presentations ...  

Broader source: Energy.gov (indexed) [DOE]

and Peak Shifting - Steve Willard, PNM.pdf ESS 2010 Update Conference - Tehachapi Wind Energy Storage - Loic Gaillac, SCE.pdf ESS 2010 Update Conference - Flow Battery Solution...

389

Residential Energy Efficiency Technical Update Meeting: August...  

Broader source: Energy.gov (indexed) [DOE]

Technical Update Meeting: August 2011 Residential Energy Efficiency Technical Update Meeting: August 2011 On this page, you may link to the summary report and presentations for the...

390

Industrial heat pumps - types and costs  

SciTech Connect (OSTI)

Confusion about energy savings and economics is preventing many potentially beneficial applications for industrial heat pumps. The variety of heat pumps available and the lack of a standard rating system cause some of this confusion. The authors illustrate how a simple categorization based on coefficient of performance (COP) can compare the cost of recovering waste energy with heat pumps. After evaluating examples in which the cost of energy delivered was calculated based on estimates of capital cost, operating costs, and maintenance costs, they compare heat pumps from the various categories on the basis of economics. 6 references, 6 figures, 1 table.

Chappell, R.N.; Bliem, C.J. Jr.; Mills, J.I.; Demuth, O.J.; Plaster, D.S.

1985-08-01T23:59:59.000Z

391

GAO Cost Estimating and Assessment Guide Twelve Steps of a High-Quality Cost Estimating Process  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG | Department of Energy Freeport LNGEnergy Research |G-8

392

Cost uncertainty for different levels of technology maturity  

SciTech Connect (OSTI)

It is difficult at best to apply a single methodology for estimating cost uncertainties related to technologies of differing maturity. While highly mature technologies may have significant performance and manufacturing cost data available, less well developed technologies may be defined in only conceptual terms. Regardless of the degree of technical maturity, often a cost estimate relating to application of the technology may be required to justify continued funding for development. Yet, a cost estimate without its associated uncertainty lacks the information required to assess the economic risk. For this reason, it is important for the developer to provide some type of uncertainty along with a cost estimate. This study demonstrates how different methodologies for estimating uncertainties can be applied to cost estimates for technologies of different maturities. For a less well developed technology an uncertainty analysis of the cost estimate can be based on a sensitivity analysis; whereas, an uncertainty analysis of the cost estimate for a well developed technology can be based on an error propagation technique from classical statistics. It was decided to demonstrate these uncertainty estimation techniques with (1) an investigation of the additional cost of remediation due to beyond baseline, nearly complete, waste heel retrieval from underground storage tanks (USTs) at Hanford; and (2) the cost related to the use of crystalline silico-titanate (CST) rather than the baseline CS100 ion exchange resin for cesium separation from UST waste at Hanford.

DeMuth, S.F. [Los Alamos National Lab., NM (United States); Franklin, A.L. [Pacific Northwest National Lab., Richland, WA (United States)

1996-08-07T23:59:59.000Z

393

Hopper Updates and Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickr FlickrGuidedCH2MLLC HistoryVeterans | Updates and Status Current

394

Carver Updates and Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone6Energy,MUSEUM DISPLAYCareers TheEmail Announcements Updates and

395

Next Update: November 2013  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia,(Million Barrels) Crude Oil Reserves in Nonproducing ReservoirsYear-Month WeekReserves (Billion Cubic Next Update:Next

396

Next Update: November 2013  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia,(Million Barrels) Crude Oil Reserves in Nonproducing ReservoirsYear-Month WeekReserves (Billion Cubic Next Update:Next

397

Updates and Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered energy consumption by sectorlongUpdates by Diane Johnson Email Alerts Subscribe to

398

Euclid Updates and Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4:Epitaxial Thin Film XRD EpitaxialProgrammingStatus Updates and

399

Genepool Updates and Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickr Flickr Editor'sshort version) ThelongEmailStatus Updates and Status

400

Transition-cost issues for a restructuring US electricity industry  

SciTech Connect (OSTI)

Utilities regulators can use a variety of approaches to calculate transition costs. We categorized these approaches along three dimensions. The first dimension is the use of administrative vs. market procedures to value the assets in question. Administrative approaches use analytical techniques to estimate transition costs. Market valuation relies on the purchase price of particular assets to determine their market values. The second dimension concerns when the valuation is done, either before or after the restructuring of the electricity industry. The third dimension concerns the level of detail involved in the valuation, what is often called top-down vs. bottom-up valuation. This paper discusses estimation approaches, criteria to assess estimation methods, specific approaches to estimating transition costs, factors that affect transition-cost estimates, strategies to address transition costs, who should pay transition costs, and the integration of cost recovery with competitive markets.

NONE

1997-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Project Functions and Activities Definitions for Total Project Cost  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter provides guidelines developed to define the obvious disparity of opinions and practices with regard to what exactly is included in total estimated cost (TEC) and total project cost (TPC).

1997-03-28T23:59:59.000Z

402

A methodology to assess cost implications of automotive customization  

E-Print Network [OSTI]

This thesis focuses on determining the cost of customization for different components or groups of components of a car. It offers a methodology to estimate the manufacturing cost of a complex system such as a car. This ...

Fournier, Laëtitia

2005-01-01T23:59:59.000Z

403

Prediction markets for cost and risk assessment  

E-Print Network [OSTI]

Several temporal and political factors can sometimes limit the effectiveness of traditional methods of project tracking and cost estimation. A large organization is susceptible to internal and external risks that are ...

Aggarwal, Taroon

2011-01-01T23:59:59.000Z

404

Updated 4-13 James S. Ketchum  

E-Print Network [OSTI]

is responsible for the development and execution of all plans and budgets for the Navy Strategic Weapons System overall leadership, guidance and direction for program life- cycle estimates, program cost and earned value evaluations, scheduling and planning necessary to design, develop and deliver the GOES-R system

405

An Updated Methodology for Enhancing Risk Monitors with Integrated Equipment Condition Assessment  

SciTech Connect (OSTI)

Small modular reactors (SMRs) generally include reactors with electric output of ~350 MWe or less (this cutoff varies somewhat but is substantially less than full-size plant output of 700 MWe or more). Advanced SMRs (AdvSMRs) refer to a specific class of SMRs and are based on modularization of advanced reactor concepts. Enhancing affordability of AdvSMRs will be critical to ensuring wider deployment, as AdvSMRs suffer from loss of economies of scale inherent in small reactors when compared to large (~greater than 600 MWe output) reactors and the controllable day-to-day costs of AdvSMRs will be dominated by operation and maintenance (O&M) costs. Technologies that help characterize real-time risk are important for controlling O&M costs. Risk monitors are used in current nuclear power plants to provide a point-in-time estimate of the system risk given the current plant configuration (e.g., equipment availability, operational regime, and environmental conditions). However, current risk monitors are unable to support the capability requirements listed above as they do not take into account plant-specific normal, abnormal, and deteriorating states of active components and systems. This report documents technology developments towards enhancing risk monitors that, if integrated with supervisory plant control systems, can provide the capability requirements listed and meet the goals of controlling O&M costs. The report describes research results on augmenting an initial methodology for enhanced risk monitors that integrate real-time information about equipment condition and POF into risk monitors. Methods to propagate uncertainty through the enhanced risk monitor are evaluated. Available data to quantify the level of uncertainty and the POF of key components are examined for their relevance, and a status update of this data evaluation is described. Finally, we describe potential targets for developing new risk metrics that may be useful for studying trade-offs for economic operation while maintaining adequate safety margins.

Ramuhalli, Pradeep; Hirt, Evelyn H.; Coles, Garill A.; Bonebrake, Christopher A.; Ivans, William J.; Wootan, David W.; Mitchell, Mark R.

2014-07-18T23:59:59.000Z

406

Estimating Methods - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

direct costs, and other estimating considerations are discussed in this chapter. g4301-1chp15.pdf -- PDF Document, 28 KB Writer: John Makepeace Subjects: Administration Management...

407

Updated NGNP Fuel Acquisition Strategy  

SciTech Connect (OSTI)

A Next Generation Nuclear Plant (NGNP) fuel acquisition strategy was first established in 2007. In that report, a detailed technical assessment of potential fuel vendors for the first core of NGNP was conducted by an independent group of international experts based on input from the three major reactor vendor teams. Part of the assessment included an evaluation of the credibility of each option, along with a cost and schedule to implement each strategy compared with the schedule and throughput needs of the NGNP project. While credible options were identified based on the conditions in place at the time, many changes in the assumptions underlying the strategy and in externalities that have occurred in the interim requiring that the options be re-evaluated. This document presents an update to that strategy based on current capabilities for fuel fabrication as well as fuel performance and qualification testing worldwide. In light of the recent Pebble Bed Modular Reactor (PBMR) project closure, the Advanced Gas Reactor (AGR) fuel development and qualification program needs to support both pebble and prismatic options under the NGNP project. A number of assumptions were established that formed a context for the evaluation. Of these, the most important are: • Based on logistics associated with the on-going engineering design activities, vendor teams would start preliminary design in October 2012 and complete in May 2014. A decision on reactor type will be made following preliminary design, with the decision process assumed to be completed in January 2015. Thus, no fuel decision (pebble or prismatic) will be made in the near term. • Activities necessary for both pebble and prismatic fuel qualification will be conducted in parallel until a fuel form selection is made. As such, process development, fuel fabrication, irradiation, and testing for pebble and prismatic options should not negatively influence each other during the period prior to a decision on reactor type. • Additional funding will be made available beginning in fiscal year (FY) 2012 to support pebble bed fuel fabrication process development and fuel testing while maintaining the prismatic fuel schedule. Options for fuel fabrication for prismatic and pebble bed were evaluated based on the credibility of each option, along with a cost and schedule to implement each strategy. The sole prismatic option is Babcock and Wilcox (B&W) producing uranium oxycarbide (UCO) tristructural-isotropic (TRISO) fuel particles in compacts. This option finishes in the middle of 2022 . Options for the pebble bed are Nuclear Fuel Industries (NFI) in Japan producing uranium dioxide (UO2) TRISO fuel particles, and/or B&W producing UCO or UO2 TRISO fuel particles. All pebble options finish in mid to late 2022.

David Petti; Tim Abram; Richard Hobbins; Jim Kendall

2010-12-01T23:59:59.000Z

408

Waste Management Facilities Cost Information Report  

SciTech Connect (OSTI)

The Waste Management Facility Cost Information (WMFCI) Report, commissioned by the US Department of Energy (DOE), develops planning life-cycle cost (PLCC) estimates for treatment, storage, and disposal facilities. This report contains PLCC estimates versus capacity for 26 different facility cost modules. A procedure to guide DOE and its contractor personnel in the use of estimating data is also provided. Estimates in the report apply to five distinctive waste streams: low-level waste, low-level mixed waste, alpha contaminated low-level waste, alpha contaminated low-level mixed waste, and transuranic waste. The report addresses five different treatment types: incineration, metal/melting and recovery, shredder/compaction, solidification, and vitrification. Data in this report allows the user to develop PLCC estimates for various waste management options.

Feizollahi, F.; Shropshire, D.

1992-10-01T23:59:59.000Z

409

Accuracy of Contemporary Parametric Software Estimation Models: A Comparative Analysis  

E-Print Network [OSTI]

with delays and being costly and error- prone. Inaccurate estimation of project resources is considered as one the costs, schedule and the resources for IT projects. Software estimation is the process of predicting the effort, duration and cost required to develop a software system [2]. Estimators often rely on one or more

Tomkins, Andrew

410

APPROVED MINORS Updated on April 4, 2013  

E-Print Network [OSTI]

APPROVED MINORS Updated on April 4, 2013 Note: Please go to Department webpages for updates. Page 1;APPROVED MINORS Updated on April 4, 2013 Note: Please go to Department webpages for updates. Page 2 COLLEGE Studies Cinema Studies Classics Communication Dance Education English European Cultural Studies Forensics

New Hampshire, University of

411

Optimized Pathways for Regional H2 Infrastructure Transitions: The Least-Cost Hydrogen for Southern California  

E-Print Network [OSTI]

Costs to Estimate Hydrogen Pipeline Costs. University ofPipeline network gradually expands and eventually takes over all hydrogenpipelines. These technologies compete with each other to meet an exogenously estimated hydrogen

Lin, Zhenhong; Chen, Chien-Wei; Fan, Yueyue; Ogden, Joan M.

2008-01-01T23:59:59.000Z

412

Neural networks for modelling the final target cost of water projects   

E-Print Network [OSTI]

Producing reasonably accurate cost estimates at the planning stage of a project important for the subsequent success of the project. The estimator has to be able to make judgement on the cost influence of a number of factors ...

Ahiaga-Dagbui, Dominic D; Smith, Simon D

413

IEAB Invasive Mussels Update September 2013 Invasive Mussels Update  

E-Print Network [OSTI]

....................................................... 16 8. Update on Mussel Control Agents Area MFWP Montana Fish Wildlife and Parks NASQAN National Stream Quality Accounting Network NGO Non, respectively, during 2012. A total of 109 mussel-infested boats were found during

414

Cogeneration Project Analysis Update  

E-Print Network [OSTI]

in the project. For the typical system, as shown in Figure 2, sulfur and NOx are the prime fuel related environmental concerns. Another fuel related concern, which may surface during operation is the opacity of the exhaust. However, if the system is well... designed, this should not be a problem; Depending on the type of system and fuel used, you may need to treat the stack gases to be in compliance. This in itself will increase the project cost and complicate the system operation. Fuel Cost Criteria Ve...

Robinson, A. M.; Garcia, L. N.

415

Costing of Joining Methods -Arc Welding Costs  

E-Print Network [OSTI]

Costing of Joining Methods - Arc Welding Costs ver. 1 ME 6222: Manufacturing Processes and Systems.S. Colton © GIT 2009 5 #12;LaborLabor Di t ti f ldi· Direct time of welding ­ time to produce a length of weld ­ labor rate ­ multiplication gives labor cost per length · Set-up time, etc. · Personal time

Colton, Jonathan S.

416

A Framework to Support A Systematic Approach to Unit Cost Development  

E-Print Network [OSTI]

Availability of historical unit cost data is an important factor in developing accurate project cost estimates. State highway agencies (SHAs) collect data on historical bids and/or production rates, crew sizes and mixes, material costs...

Ramesh, Sushanth

2011-02-22T23:59:59.000Z

417

Fermilab D-0 Experimental Facility: Energy conservation report and mechanical systems design optimization and cost analysis study  

SciTech Connect (OSTI)

This report is developed as part of the Fermilab D-0 Experimental Facility Project Title II Design Documentation Update. As such, it concentrates primarily on HVAC mechanical systems design optimization and cost analysis.

Krstulovich, S.F.

1987-10-31T23:59:59.000Z

418

PHENIX WBS notes. Cost and schedule review copy  

SciTech Connect (OSTI)

The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds are shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.

Not Available

1994-02-01T23:59:59.000Z

419

Chapter 11Chapter 11 Estimating the Weighted  

E-Print Network [OSTI]

Chapter 11Chapter 11 Estimating the Weighted Average Cost of Capital DES Chapter 11 1 #12;U i th C.xls for shortfor short. DES Chapter 11 2 #12;S i l i hSteps to estimate value using the Corporate Valuation stockholders DES Chapter 11 7 #12;Estimating Target Weights Page 223: To calculate WACC, we need to estimate

Schubart, Christoph

420

Progress Update: M Area Closure  

ScienceCinema (OSTI)

A progress update of the Recovery Act at work at the Savannah River Site. The celebration of the first area cleanup completion with the help of the Recovery Act.

Cody, Tom

2012-06-14T23:59:59.000Z

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Gearbox Reliability Collaborative Update (Presentation)  

SciTech Connect (OSTI)

This presentation was given at the Sandia Reliability Workshop in August 2013 and provides information on current statistics, a status update, next steps, and other reliability research and development activities related to the Gearbox Reliability Collaborative.

Sheng, S.

2013-10-01T23:59:59.000Z

422

Agricultural and Resource Economics Update  

E-Print Network [OSTI]

corn prices, but crude oil prices are also relatively highSmith. “What is the Price of Oil? ” ARE Update 11(5) (2008):ates with the prices of corn and crude oil. Until 2011 there

2012-01-01T23:59:59.000Z

423

Sign Up For Email Updates  

Broader source: Energy.gov [DOE]

Be the first to know of the latest developments from the Energy.gov team -- from videos to infographics to live Q&A’s -- by signing up for email updates.

424

Updated 030613 University of California  

E-Print Network [OSTI]

Updated 030613 University of California Berkeley UC Berkeley Summer Sessions- ASTRON W12/EPS W12: The Solar System with MasteringAstronomy, 6/E. Jeffrey O. Bennett, et al. ISBN-10: 0321642678 ISBN-13

Walker, Matthew P.

425

Ksplice: Automatic Rebootless Kernel Updates  

E-Print Network [OSTI]

Ksplice allows system administrators to apply patches to their operating system kernels without rebooting. Unlike previous hot update systems, Ksplice operates at the object code layer, which allows Ksplice to transform ...

Kaashoek, M. Frans

2009-01-01T23:59:59.000Z

426

An Assessment of the Near-Term Costs of Hydrogen Refueling Stations and Station Components  

E-Print Network [OSTI]

station. H2Gen’s estimates for capital costs are also lowerestimates and show high variability (26%-117% of capital costs).capital costs of about $250,000. Existing hydrogen station cost analyses tend to under-estimate

Weinert, Jonathan X.; Lipman, Timothy

2006-01-01T23:59:59.000Z

427

Microsoft Word - updated Recipient Webinar Transcript GL | Department...  

Broader source: Energy.gov (indexed) [DOE]

updated Recipient Webinar Transcript GL Microsoft Word - updated Recipient Webinar Transcript GL Microsoft Word - updated Recipient Webinar Transcript GL More Documents &...

428

New analysis techniques for estimating impacts of federal appliance efficiency standards  

SciTech Connect (OSTI)

Impacts of U.S. appliance and equipment standards have been described previously. Since 2000, the U.S. Department of Energy (DOE) has updated standards for clothes washers, water heaters, and residential central air conditioners and heat pumps. A revised estimate of the aggregate impacts of all the residential appliance standards in the United States shows that existing standards will reduce residential primary energy consumption and associated carbon dioxide (CO{sub 2}) emissions by 89 percent in 2020 compared to the levels expected without any standards. Studies of possible new standards are underway for residential furnaces and boilers, as well as a number of products in the commercial (tertiary) sector, such as distribution transformers and unitary air conditioners. The analysis of standards has evolved in response to critiques and in an attempt to develop more precise estimates of costs and benefits of these regulations. The newer analysis elements include: (1) valuing energy savings by using marginal (rather than average) energy prices specific to an end-use; (2) simulating the impacts of energy efficiency increases over a sample population of consumers to quantify the proportion of households having net benefits or net costs over the life of the appliance; and (3) calculating marginal markups in distribution channels to derive the incremental change in retail prices associated with increased manufacturing costs for improving energy efficiency.

McMahon, James E.

2003-06-24T23:59:59.000Z

429

Contracting with reading costs and renegotiation costs  

E-Print Network [OSTI]

OF CALIFORNIA, SAN DIEGO Contracting with Reading Costs andrents, and the competitive contracting process. Journal ofReiche. Foundation of incomplete contracting in a model of

Brennan, James R.

2007-01-01T23:59:59.000Z

430

Polypropylene reinvented: Costs of using metallocene catalysts  

SciTech Connect (OSTI)

This study develops scoping estimates of the required capital investment and manufacturing costs to make a zirconocene catalyst/cocatalyst system [(F{sub 6}-acen)Zr(CH{sub 2}CMe{sub 3})(NMe{sub 2}Ph)][B(C{sub 6}F{sub 5}){sub 4}] immobilized on a silica support. Costs for this fluorine-based system are compared with estimates for two other metallocene catalysts using methylaluminoxane (MAO)-based cocatalysts. Including wt of support and cocatalyst, each of the production facilities for making the 3 zirconocene catalyst systems is sized at 364--484 tonnes/year. Cost to make the F-based catalyst system is estimated to be $10780/kg, assuming 20% return on capital invested. Costs for the two MAO-based catalyst system fall in the range of $10950--12160/kg, assuming same return. Within the {plus_minus}50% accuracy of these estimates, these differences are not significant. Given a catalyst productivity of 250 kg resin/gram zirconocene, the cost contribution in the finished ethylene-propylene copolymer resin is 4.4 cents/kg, excluding selling, administrative, research costs.

Brockmeier, N.F.

1996-05-01T23:59:59.000Z

431

Nitrogen trifluoride global emissions estimated from updated atmospheric measurements  

E-Print Network [OSTI]

Nitrogen trifluoride (NF[subscript 3]) has potential to make a growing contribution to the Earth’s radiative budget; however, our understanding of its atmospheric burden and emission rates has been limited. Based on a ...

Ivy, Diane J.

432

Indian Country Solar Energy Potential Estimates & DOE IE Updates  

Office of Environmental Management (EM)

borrower must be rural small business or agricultural producer * Technology: biomass, solar, wind, hydro, hydrogen, geothermal * Applications: equipment, construction,...

433

Indian Country Solar Energy Potential Estimates & DOE IE Updates  

Office of Environmental Management (EM)

Pathways to Sustained Energy Development in Oklahoma Oklahoma Tribal Leader Forum - August 2012 Oklahoma City, Oklahoma 1 Office of Indian Energy Goals and Objectives * Promote...

434

Indian Country Solar Energy Potential Estimates & DOE IE Updates  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartment ofTheDepartment of2012Pathways to Sustained Energy

435

Indian Country Solar Energy Potential Estimates & DOE IE Updates  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartment ofTheDepartment of2012Pathways to Sustained

436

Indian Country Solar Energy Potential Estimates & DOE IE Updates  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartment ofTheDepartment of2012Pathways to SustainedFinancing

437

Indian Country Solar Energy Potential Estimates & DOE IE Updates  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartment ofTheDepartment of2012Pathways to

438

Indian Country Solar Energy Potential Estimates & DOE IE Updates  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartment ofTheDepartment of2012Pathways toDay 2 Project

439

Indian Country Solar Energy Potential Estimates & DOE IE Updates  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartment ofTheDepartment of2012Pathways toDay 2 Project3:

440

Indian Country Solar Energy Potential Estimates & DOE IE Updates  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartment ofTheDepartment of2012Pathways toDay 2

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Cost and Performance Model for Redox Flow Batteries  

SciTech Connect (OSTI)

A cost model was developed for all vanadium and iron-vanadium redox flow batteries. Electrochemical performance modeling was done to estimate stack performance at various power densities as a function of state of charge. This was supplemented with a shunt current model and a pumping loss model to estimate actual system efficiency. The operating parameters such as power density, flow rates and design parameters such as electrode aspect ratio, electrolyte flow channel dimensions were adjusted to maximize efficiency and minimize capital costs. Detailed cost estimates were obtained from various vendors to calculate cost estimates for present, realistic and optimistic scenarios. The main drivers for cost reduction for various chemistries were identified as a function of the energy to power ratio of the storage system. Levelized cost analysis further guided suitability of various chemistries for different applications.

Viswanathan, Vilayanur V.; Crawford, Aladsair J.; Stephenson, David E.; Kim, Soowhan; Wang, Wei; Li, Bin; Coffey, Greg W.; Thomsen, Edwin C.; Graff, Gordon L.; Balducci, Patrick J.; Kintner-Meyer, Michael CW; Sprenkle, Vincent L.

2014-02-01T23:59:59.000Z

442

Is the Insurance Cost-of-Capital Fair? Mathieu Gatumel  

E-Print Network [OSTI]

companies or on the modelling of insurance business profit and loss. We estimate a cost-of-capital rateIs the Insurance Cost-of-Capital Fair? Mathieu Gatumel CAHIER DE RECHERCHE n°2011-07 E2 Unité Mixte the Insurance Cost-of-Capital Fair? MathieuMathieuMathieuMathieu GatumelGatumelGatumelGatumel University

Boyer, Edmond

443

Cost and Performance Comparison Of Stationary Hydrogen Fueling Appliances  

E-Print Network [OSTI]

was that "the costs of maintaining the existing gasoline infrastructure per vehicle supported are up to two vehicles (FCV's) and the cost of hydrogen produced by these HFA's. In previous studies we evaluated experience to develop a system of tools and methods for cost estimation of engineering designs. The DFMA

444

SEE Action Webinar on Energy Efficiency Measure Cost Studies  

Broader source: Energy.gov [DOE]

Presented by State and Local Energy Efficiency Action Network (SEE Action), this webinar will explain the importance of measure cost studies, review the current "state of the science" of measure cost development and estimation, and explore opportunities for future collaboration and advancement of measure cost research.

445

Estimates of US biomass energy consumption 1992  

SciTech Connect (OSTI)

This report is the seventh in a series of publications developed by the Energy Information Administration (EIA) to quantify the biomass-derived primary energy used by the US economy. It presents estimates of 1991 and 1992 consumption. The objective of this report is to provide updated estimates of biomass energy consumption for use by Congress, Federal and State agencies, biomass producers and end-use sectors, and the public at large.

Not Available

1994-05-06T23:59:59.000Z

446

BETO Announces Updated Multi-Year Program Plan: November 2014...  

Broader source: Energy.gov (indexed) [DOE]

update of the MYPP. Addthis Related Articles Update Released to BETO's Multi-Year Program Plan BETO Announces Updated Multi-Year Program Plan DOE Publishes Updated SSL R&D Plan...

447

Updating Technical Screens for PV Interconnection: Preprint  

SciTech Connect (OSTI)

Solar photovoltaics (PV) is the dominant type of distributed generation (DG) technology interconnected to electric distribution systems in the United States, and deployment of PV systems continues to increase rapidly. Considering the rapid growth and widespread deployment of PV systems in United States electric distribution grids, it is important that interconnection procedures be as streamlined as possible to avoid unnecessary interconnection studies, costs, and delays. Because many PV interconnection applications involve high penetration scenarios, the process needs to allow for a sufficiently rigorous technical evaluation to identify and address possible system impacts. Existing interconnection procedures are designed to balance the need for efficiency and technical rigor for all DG. However, there is an implicit expectation that those procedures will be updated over time in order to remain relevant with respect to evolving standards, technology, and practical experience. Modifications to interconnection screens and procedures must focus on maintaining or improving safety and reliability, as well as accurately allocating costs and improving expediency of the interconnection process. This paper evaluates the origins and usefulness of the capacity penetration screen, offers potential short-term solutions which could effectively allow fast-track interconnection to many PV system applications, and considers longer-term solutions for increasing PV deployment levels in a safe and reliable manner while reducing or eliminating the emphasis on the penetration screen.

Coddington, M.; Ellis, A.; Lynn, K.; Razon, A.; Key, T.; Kroposki, B.; Mather, B.; Hill, R.; Nicole, K.; Smith, J.

2012-08-01T23:59:59.000Z

448

OOTW COST TOOLS  

SciTech Connect (OSTI)

This document reports the results of a study of cost tools to support the analysis of Operations Other Than War (OOTW). It recommends the continued development of the Department of Defense (DoD) Contingency Operational Support Tool (COST) as the basic cost analysis tool for 00TWS. It also recommends modifications to be included in future versions of COST and the development of an 00TW mission planning tool to supply valid input for costing.

HARTLEY, D.S.III; PACKARD, S.L.

1998-09-01T23:59:59.000Z

449

Cost Methodology for Biomass Feedstocks: Herbaceous Crops and Agricultural Residues  

SciTech Connect (OSTI)

This report describes a set of procedures and assumptions used to estimate production and logistics costs of bioenergy feedstocks from herbaceous crops and agricultural residues. The engineering-economic analysis discussed here is based on methodologies developed by the American Society of Agricultural and Biological Engineers (ASABE) and the American Agricultural Economics Association (AAEA). An engineering-economic analysis approach was chosen due to lack of historical cost data for bioenergy feedstocks. Instead, costs are calculated using assumptions for equipment performance, input prices, and yield data derived from equipment manufacturers, research literature, and/or standards. Cost estimates account for fixed and variable costs. Several examples of this costing methodology used to estimate feedstock logistics costs are included at the end of this report.

Turhollow Jr, Anthony F [ORNL; Webb, Erin [ORNL; Sokhansanj, Shahabaddine [ORNL

2009-12-01T23:59:59.000Z

450

An updated dose assessment for Rongelap Island  

SciTech Connect (OSTI)

We have updated the radiological dose assessment for Rongelap Island at Rongelap Atoll using data generated from field trips to the atoll during 1986 through 1993. The data base used for this dose assessment is ten fold greater than that available for the 1982 assessment. Details of each data base are presented along with details about the methods used to calculate the dose from each exposure pathway. The doses are calculated for a resettlement date of January 1, 1995. The maximum annual effective dose is 0.26 mSv y{sup {minus}1} (26 mrem y{sup {minus}1}). The estimated 30-, 50-, and 70-y integral effective doses are 0.0059 Sv (0.59 rem), 0.0082 Sv (0.82 rem), and 0.0097 Sv (0.97 rem), respectively. More than 95% of these estimated doses are due to 137-Cesium ({sup 137}Cs). About 1.5% of the estimated dose is contributed by 90-Strontium ({sup 90}Sr), and about the same amount each by 239+240-Plutonium ({sup 239+240}PU), and 241-Americium ({sup 241}Am).

Robison, W.L.; Conrado, C.L.; Bogen, K.T.

1994-07-01T23:59:59.000Z

451

Rancho Seco--Decommissioning Update  

SciTech Connect (OSTI)

The Rancho Seco Nuclear Generating Station ceased operation in June of 1989 and entered an extended period of SAFSTOR to allow funds to accumulate for dismantlement. Incremental dismantlement was begun in 1997 of steam systems and based on the successful completion of work, the Sacramento Municipal Utility District (SMUD) board of directors approved full decommissioning in July 1999. A schedule has been developed for completion of decommissioning by 2008, allowing decommissioning funds to accumulate until they are needed. Systems removal began in the Auxiliary Building in October of 1999 and in the Reactor Building in January of 2000. Systems dismantlement continues in the Reactor Building and should be completed by the end of 2003. System removal is near completion in the Auxiliary Building with removal of the final liquid waste tanks in progress. The spent fuel has been moved to dry storage in an onsite ISFSI, with completion on August 21, 2002. The spent fuel racks are currently being removed from the pool, packaged and shipped, and then the pool will be cleaned. Also in the last year the reactor coolant pumps and primary piping were removed and shipped. Characterization and planning work for the reactor vessel and internals is also in progress with various cut-up and/or disposal options being evaluated. In the year ahead the remaining systems in the Reactor Building will be removed, packaged and sent for disposal, including the pressurizer. Work will be started on embedded and underground piping and the large outdoor tanks. Building survey and decontamination will begin. RFP's for removal of the vessel and internals and the steam generators are planned to fix the cost of those components. If the costs are consistent with current estimates the work will go forward. If they are not, hardened SAFSTOR/entombment may be considered.

Newey, J. M.; Ronningen, E. T.; Snyder, M. W.

2003-02-26T23:59:59.000Z

452

NEMA Distribution Transformers, CCE Overview and Update presentation...  

Broader source: Energy.gov (indexed) [DOE]

Distribution Transformers, CCE Overview and Update presentation, dated 05242011 NEMA Distribution Transformers, CCE Overview and Update presentation, dated 05242011 This...

453

Update on the European Weather Radar Network Iwan Holleman, Laurent Delobbe, and Anton Zgonc  

E-Print Network [OSTI]

(EARS) I. INTRODUCTION The tradition of weather radar collaboration at the European level dates back to COST 72 (Measurement of precipitation by radar) which started in 1979 and which presented its final reUpdate on the European Weather Radar Network (OPERA) Iwan Holleman, Laurent Delobbe, and Anton

Stoffelen, Ad

454

Portfolio of Tools, Faculty Pay-Merit Paradigm (updated August 2012) Type of Faculty  

E-Print Network [OSTI]

Portfolio of Tools, Faculty Pay-Merit Paradigm (updated August 2012) Type of Faculty Salary-tenure review). This tool contrasts with "standard" equity (see other side). Cost-share: Central campus pays up. Rolling horizon of implementation; local units drive process. TBD: HR Redesign tools; periodicity of CCF

Sheridan, Jennifer

455

Minimization of Life Cycle Costs Through Optimization of the Validation Program A Test Sample Size and Warranty Cost  

E-Print Network [OSTI]

process. 1 Validation cost usually includes engineering and capital expenses associated with full, where a validation engineer is expected to estimate validation cost based on the reliabilityMinimization of Life Cycle Costs Through Optimization of the Validation Program ­ A Test Sample

Sandborn, Peter

456

Hydrogen refueling station costs in Shanghai  

E-Print Network [OSTI]

Elec Del Cali: Del Investment Cost Delivery Cost OperatingCost Feedstock Cost Investment Cost Delivery Cost Operatingcosts Annualized investment cost, 1000$/yr Total annualized

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2007-01-01T23:59:59.000Z

457

2006 INTEGRATED ENERGY POLICY REPORT UPDATE  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION 2006 INTEGRATED ENERGY POLICY REPORT UPDATE INTEGRATED ENERGY POLICY REPORT UPDATE January 3, 2007 Executive Summary Page E-2, first paragraph under conducted two cycles of renewable energy solicitations and negotiated a number of bilateral agreements

458

Energy Storage Systems 2010 Update Conference Presentations ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

3 Energy Storage Systems 2010 Update Conference Presentations - Day 2, Session 3 The U.S. DOE Energy Storage Systems Program (ESS) conducted a record-breaking Update Conference at...

459

Energy Storage Systems 2010 Update Conference Presentations ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2 Energy Storage Systems 2010 Update Conference Presentations - Day 2, Session 2 The U.S. DOE Energy Storage Systems Program (ESS) conducted a record-breaking Update Conference at...

460

Energy Storage Systems 2010 Update Conference Presentations ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

4 Energy Storage Systems 2010 Update Conference Presentations - Day 1, Session 4 The U.S. DOE Energy Storage Systems Program (ESS) conducted a record-breaking Update Conference at...

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Energy Storage Systems 2010 Update Conference Presentations ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

1 Energy Storage Systems 2010 Update Conference Presentations - Day 1, Session 1 The U.S. DOE Energy Storage Systems Program (ESS) conducted a record-breaking Update Conference at...

462

Energy Storage Systems 2010 Update Conference Presentations ...  

Broader source: Energy.gov (indexed) [DOE]

Terry Aselage, are below. ESS 2010 Update Conference - Advanced Stationary Electrical Energy Storage R&D at PNNL - Z Gary Yang, PNNL.pdf ESS 2010 Update Conference - A New...

463

Energy Storage Systems 2010 Update Conference Presentations ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

3 Energy Storage Systems 2010 Update Conference Presentations - Day 1, Session 3 The U.S. DOE Energy Storage Systems Program (ESS) conducted a record-breaking Update Conference at...

464

Energy Storage Systems 2010 Update Conference Presentations ...  

Broader source: Energy.gov (indexed) [DOE]

chaired by ARPA-E's Mark Johnson, are below. ESS 2010 Update Conference - Electrochemical Energy Storage for the Grid - Yet-Ming Chiang, MIT.pdf ESS 2010 Update Conference - DOE...

465

Nano Communication Networks Update | GE Global Research  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Nano Communication Networks Update Nano Communication Networks Update Steve Bush 2011.12.09 Hi everybody, In my last blog I talked about some of the work I have been doing...

466

Catalog Update 2006 International Education Abroad 1  

E-Print Network [OSTI]

Catalog Update 2006 International Education Abroad 1 INTERNATIONAL EDUCATION ABROAD 2005-2007 CATALOG UPDATE Changes effective 2006-2007 New Courses CHN 310 China Summer Study Abroad Program 6-7 hours

Gering, Jon C.

467

Reported Energy and Cost Savings from the DOE ESPC Program  

SciTech Connect (OSTI)

The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy's Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 134 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project. For 133 of the 134 projects, there was sufficient information to compare estimated, reported, and guaranteed cost savings. For this group, the total estimated cost savings for the reporting periods addressed were $95.7 million, total reported cost savings were $96.8 million, and total guaranteed cost savings were $92.1 million. This means that on average: ESPC contractors guaranteed 96% of the estimated cost savings, projects reported achieving 101% of the estimated cost savings, and projects reported achieving 105% of the guaranteed cost savings. For 129 of the projects examined, there was sufficient information to compare estimated and reported energy savings. On the basis of site energy, estimated savings for those projects for the previous year totaled 5.371 million MMBtu, and reported savings were 5.374 million MMBtu, just over 100% of the estimated energy savings. On the basis of source energy, total estimated energy savings for the 129 projects were 10.400 million MMBtu, and reported saving were 10.405 million MMBtu, again, just over 100.0% of the estimated energy savings.

Shonder, John A [ORNL; Slattery, Bob S [ORNL; Atkin, Erica [ORNL

2012-01-01T23:59:59.000Z

468

ECONOMICS UPDATE Issue 1 Autumn 2014  

E-Print Network [OSTI]

ECONOMICS UPDATE Issue 1 Economics Update Autumn 2014 UNIVERSITY OF ABERDEEN ­ DEPARTMENT OF ECONOMICS IN THIS ISSUE Welcome to the first Economics update! In this twice-yearly publication, we. In the Research Assessment Exercise results of 2008, 100% of Economics research, was judged to be of international

Levi, Ran

469

Software Update Recovery for Wireless Sensor Networks  

E-Print Network [OSTI]

mechanism that uses loss-of- control to provide high-reliability, low energy, software updates, includingSoftware Update Recovery for Wireless Sensor Networks Stephen Brown1 and Cormac J. Sreenan2 1 Laboratory, University College Cork, Ireland Abstract. Updating software over the network is important

Sreenan, Cormac J.

470

Catalog Update 2006 Math & Computer Science 1  

E-Print Network [OSTI]

Catalog Update 2006 Math & Computer Science 1 MATH AND COMPUTER SCIENCE DIVISION 2005-2007 CATALOG UPDATE Changes effective 2006-2007 Degree Update COMPUTER SCIENCE BACHELOR OF SCIENCE Semester Hours CS 100 Computer Science Seminar.........................1 CS 180 Foundations of Computer Science I

Gering, Jon C.

471

Opportunity for feedback Opportunity for updates  

E-Print Network [OSTI]

Opportunity for feedback Opportunity for updates Opportunity to find out all of the things I don) What do these all mean? Vision (1) Values (5-10) Strategic Priorities (5-7) Education, scholarship update Research Plan Pinnacles or not? Focus on impact Update every 3 yrs Capital Plan Existing

472

Life cycle cost study for coated conductor manufacture by electron beam and pulsed laser deposition systems  

SciTech Connect (OSTI)

The results of this study establish a framework for evaluation of the cost impact of many performance parameters in coated conductor manufacturing systems. Since the cost and concepts are based on early developmental results and engineering judgment, the study should be updated periodically based on latest data to enhance its usefulness. The study should be expanded to include other promising processes under consideration or development for manufacture of coated conductors. Review of this study by as wide a group of experts from industry, national laboratories and universities as possible is desirable to facilitate improving accuracy of the estimates and communication on the issues involved. The results for the case of achieving the $10/kA-m goal at a J{sub c} of 10{sup 5} a/cm{sup 2} applicable to applications requiring a magnetic field perpendicular to the direction of current flow may be viewed as somewhat discouraging. However, there is ample margin for improvement due to continued development and engineering that could enable meeting the goal of $10/kA-m.

Chapman, J.N.

1999-04-14T23:59:59.000Z

473

Techno-Economic Models for Carbon Dioxide Compression, Transport, and Storage & Correlations for Estimating Carbon Dioxide Density and Viscosity  

E-Print Network [OSTI]

Costs to Estimate Hydrogen Pipeline Costs,” UCD-ITS-RR-04-predict the costs of hydrogen pipelines, all of the modelspredict the costs of hydrogen pipelines, all of the models

McCollum, David L; Ogden, Joan M

2006-01-01T23:59:59.000Z

474

The Energy Information Administration`s assessment of reformulated gasoline: An update  

SciTech Connect (OSTI)

This report (Part II) concludes a two part study of The Energy Information Administration`s (EIA) assessment of Reformulated Gasoline (RFG). The data contained herein updates EIA`s previous findings and analyses on reformulated gasoline as it affects the petroleum industry. The major findings of Part II have not changed considerably from Part I: Supplies of RFG are adequate to meet demand, but a tight supply-demand balance exists, leaving the RFG system with little ability to absorb unexpected supply or delivery system disruption. In December 1994, the estimated demand for RFG was 2.6 million barrels per day, with the production capability just meeting this demand. The study concludes that current prices for RFG are consistent with the costs underlying the product, and the difference in RFG and conventional gasoline indicates confidence in supply. The study also follows the impact of recent events such as: postponement of the Renewable Oxygenate Standard, the decision to require importers to use the U.S. average baseline for limiting emissions, the disruption of the Colonial Pipeline in Texas, and Pennsylvania`s request to opt-out of the RFG program.

Not Available

1994-12-01T23:59:59.000Z

475

Environmental Cost Analysis  

E-Print Network [OSTI]

Environmental Cost Analysis David Edge Texas Natural Resource Conservation Commission 131 ESL-IE-00-04-21 Proceedings from the Twenty-second National Industrial Energy Technology Conference, Houston, TX, April 5-6, 2000 Tuas Natural... Resource Conservation CorDDliuion Environmental Cost Analysis Presented By David Edge Determine the Costs c> Input co Output c> Hidden c> Capital (non recurring) Envirormenlal Cost Analy.;is "There has to be a measurable result...

Edge, D.

476

Environmental benefits and cost savings through market-based instruments : an application using state-level data from India  

E-Print Network [OSTI]

This paper develops a methodology for estimating potential cost savings from the use of market-based instruments (MBIs) when local emissions and abatement cost data are not available. The paper provides estimates of the ...

Gupta, Shreekant

2002-01-01T23:59:59.000Z

477

Industrial heat pumps: types and costs  

SciTech Connect (OSTI)

Many potentially beneficial applications for industrial heat pumps are not being pursued because of confusion regarding both energy savings and economics. Part of this confusion stems from the variety of heat pumps available and the fact that the measure of merit, the coefficient of performance (COP), is commonly defined in at least three different ways. In an attempt to circumvent this problem, a simple categorization was developed based on the commonly accepted COP definitions. Using this categorization, the cost of recovering waste energy with heat pumps was examined. Examples were evaluated in which the cost of energy delivered was calculated based on estimates of capital cost, operating costs, and maintenance costs. Heat pumps from the various categories were then compared on the basis of economics.

Chappell, R.N.; Bliem, C.J. Jr.; Mills, J.I.; Demuth, O.J.; Plaster, D.S.

1985-03-01T23:59:59.000Z

478

Industrial heat pumps - types and costs  

SciTech Connect (OSTI)

Many potentially beneficial applications for industrial heat pumps are not being pursued because of confusion regarding both energy savings and economics. Part of this confusion stems from the variety of heat pumps available and the fact that the measure of merit, the coefficient of performance (COP) is commonly defined in at least three different ways. In an attempt to circumvent this problem, a simple categorization was developed based on the commonly accepted COP definitions. Using this categorization, the cost of recovering waste energy with heat pumps was examined. Examples were evaluated in which the cost of energy delivered was calculated based on estimates of capital cost, operating costs, and maintenance costs. Heat pumps from the various categories were then compared on the basis of economics. 6 refs., 7 figs.

Chappell, R.N.; Bliem, C.J. Jr.; Mills, J.I.; Demuth, O.J.; Plaster, D.S.

1985-01-01T23:59:59.000Z

479

Nuclear plant cancellations: causes, costs, and consequences  

SciTech Connect (OSTI)

This study was commissioned in order to help quantify the effects of nuclear plant cancellations on the Nation's electricity prices. This report presents a historical overview of nuclear plant cancellations through 1982, the costs associated with those cancellations, and the reasons that the projects were terminated. A survey is presented of the precedents for regulatory treatment of the costs, the specific methods of cost recovery that were adopted, and the impacts of these decisions upon ratepayers, utility stockholders, and taxpayers. Finally, the report identifies a series of other nuclear plants that remain at risk of canellation in the future, principally as a result of similar demand, finance, or regulatory problems cited as causes of cancellation in the past. The costs associated with these potential cancellations are estimated, along with their regional distributions, and likely methods of cost recovery are suggested.

Not Available

1983-04-01T23:59:59.000Z

480

BOOKS & MEDIA UPDATE Carbon Nanotechnology  

E-Print Network [OSTI]

of organic semiconductors are introduced in this book, which also gives a clear impression of the rangeBOOKS & MEDIA UPDATE Carbon Nanotechnology Liming Dai (ed.) Elsevier · 2006 · 750 pp ISBN: 0 are reviewed. Contributions by different authors are grouped into three sections on the synthesis, chemistry

Elliott, James

Note: This page contains sample records for the topic "updated cost estimates" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: A state of the art facility, at Hammersmith information visit the Faculty of Medicine web pages http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: ÂŁ60 000 000 Funding Source: SRIF II (Imperial College), GSK, MRC

482

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The refurbishment of the instrumentation equipment. This project encompasses refurbishment work on over 1,150m2 of laboratory space across four, the completed project will allow researchers to expand their work in satellite instrumentation, the fabrication

483

Task Group 9 Update (Presentation)  

SciTech Connect (OSTI)

This presentation is a brief update of IEC TC82 QA Task Force, Group 9. Presented is an outline of the recently submitted New Work Item Proposal (NWIP) for a Comparative Thermal Cycling Test for CPV Modules to Differentiate Thermal Fatigue Durability.

Bosco, N.

2014-04-01T23:59:59.000Z

484

Updated July 2009 Operations Organization  

E-Print Network [OSTI]

All-Hands, Brown Bags, and COO Open-Door sessions Ongoing Conduct Operations Employee Climate SurveysOperations Strategic Plan Updated July 2009 #12;Operations Organization Chief Operating Officer deliver exceptional operational services in support of the scientific mission of Berkeley Lab. goals

Eisen, Michael

485

Progress Update: Stack Project Complete  

SciTech Connect (OSTI)

Progress update from the Savannah River Site. The 75 foot 293 F Stack, built for plutonium production, was cut down to size in order to prevent injury or release of toxic material if the structure were to collapse due to harsh weather.

Cody, Tom

2010-01-01T23:59:59.000Z

486

Update: Proposed CE Curriculum & Program  

E-Print Network [OSTI]

Update: Proposed CE Curriculum & Program Bruce Jacob, End of Summer 2008 #12;What's all this, then, students, graduates · Held constituents' meeting over winter · Group vote this curriculum Barua has agreed to develop and teach the course ENEE 3xx (Digital systems) -- new course Bruce Jacob

Jacob, Bruce

487

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's ÂŁ20

488

Progress Update: Stack Project Complete  

ScienceCinema (OSTI)

Progress update from the Savannah River Site. The 75 foot 293 F Stack, built for plutonium production, was cut down to size in order to prevent injury or release of toxic material if the structure were to collapse due to harsh weather.

Cody, Tom

2012-06-14T23:59:59.000Z

489

Drought Update Colorado Climate Center  

E-Print Network [OSTI]

Drought Update Colorado Climate Center Roger Pielke, Sr., Director Prepared by Tara Green and Odie Bliss http://climate.atmos.colostate.edu #12;© 2003 by The Colorado Climate Center. 2 http://www.ncdc.noaa.gov/oa/climate/research/2003/mar/st005dv00pcp200303.html #12;© 2003 by The Colorado Climate Center. 3 #12;© 2003

490

Curriculum Vitae (updated Feb-2010)  

E-Print Network [OSTI]

1 Curriculum Vitae (updated Feb-2010) General Name: Song Xi CHEN Current Employment: Professor Department of Statistics Iowa State University Mail Address: Department of Statistics Iowa State University: http://www.public.iastate.edu/~songchen/ Academic History Ph.D. in Statistics, 1993, Australian

Chen, Song Xi

491

Power Plant Cycling Costs  

SciTech Connect (OSTI)

This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

2012-07-01T23:59:59.000Z

492

Estimated Value of Service Reliability for Electric Utility Customers in the United States  

E-Print Network [OSTI]

kW demand and costs per annual kWh sales. Cost estimates arePer Un-served kWh Cost Per Annual kWh Small C&I Cost PerPer Un-served kWh Cost Per Annual kWh Residential Cost Per

Sullivan, M.J.

2009-01-01T23:59:59.000Z

493

Experimental program for the development of peat gasification. Process designs and cost estimates for the manufacture of 250 billion Btu/day SNG from peat by the PEATGAS Process. Interim report No. 8  

SciTech Connect (OSTI)

This report presents process designs for the manufacture of 250 billion Btu's per day of SNG by the PEATGAS Process from peats. The purpose is to provide a preliminary assessment of the process requirements and economics of converting peat to SNG by the PEATGAS Process and to provide information needed for the Department of Energy (DOE) to plan the scope of future peat gasification studies. In the process design now being presented, peat is dried to 35% moisture before feeding to the PEATGAS reactor. This is the basic difference between the Minnesota peat case discussed in the current report and that presented in the Interim Report No. 5. The current design has overall economic advantages over the previous design. In the PEATGAS Process, peat is gasified at 500 psig in a two-stage reactor consisting of an entrained-flow hydrogasifier followed by a fluidized-bed char gasifier using steam and oxygen. The gasifier operating conditions and performance are necessarily based on the gasification kinetic model developed for the PEATGAS reactor using the laboratory- and PDU-scale data as of March 1978 and April 1979, respectively. On the basis of the available data, this study concludes that, although peat is a low-bulk density and low heating value material requiring large solids handling costs, the conversion of peat to SNG appears competitive with other alternatives being considered for producing SNG because of its very favorable gasification characteristics (high methane formation tendency and high reactivity). As a direct result of the encouraging technical and economic results, DOE is planning to modify the HYGAS facility in order to begin a peat gasification pilot plant project.

Arora, J.L.; Tsaros, C.L.

1980-02-01T23:59:59.000Z

494

Cost effective lighting  

SciTech Connect (OSTI)

Long-life replacement lamps for the incandescent lamp have been evaluated with regard to their cost effectiveness. The replacements include the use of energy buttons that extend lamp life as well as an adaptive fluorescent circline lamp that will fit into existing incandescent lamp sockets. The initial, operating, and replacement costs for one million lumen-hours are determined for each lamp system. We find the most important lighting cost component is the operating cost. Using lamps that are less efficient or devices that cause lamps to operate less efficiently are not cost-effective. The adaptive fluorescent circline lamp, even at an initial cost of $15.00, is the most cost effective source of illumination compared to the incandescent lamp and lamp systems examined. 3 refs., 6 tabs.

Morse, O.; Verderber, R.

1987-07-01T23:59:59.000Z

495

The Implied Cost of Carbon Dioxide under the Cash for Clunkers Christopher R. Knittel  

E-Print Network [OSTI]

The Implied Cost of Carbon Dioxide under the Cash for Clunkers Program Christopher R. Knittel of the implied cost of carbon dioxide reductions under the Cash for Clunker program. The estimates suggest pollutants. Conservative estimates of the implied carbon dioxide cost exceed $365 per ton; best case scenario

Rothman, Daniel

496

Hydrogen Refueling Station Costs in Shanghai  

E-Print Network [OSTI]

Costs Annualized Investment Cost, 1000$/yr Total AnnualizedH2 Fueling Stations Investment Cost Cost ($/yr) OperatingH2 Fueling Stations Investment Cost Cost ($/kg) Operating

Weinert, Jonathan X.; Shaojun, Liu; Ogden, J; Jianxin, Ma

2006-01-01T23:59:59.000Z

497

Production and cost analysis of the Bitterroot Miniyarder in Appalachia  

SciTech Connect (OSTI)

Silvicultural prescription (clearcut or partial cut) and av. price weight removed most significantly affected yarding cost for the yarder operating in clearcuts and partial cuts with a 4-man crew. Yarding cost estimates ranged from US$8-25/ton, depending on silviculture prescription, tons removed per acre, and unit shape where the av. piece removed weighed >200lb. With pieces weighing <200lb, yarding cost estimates increased rapidly, approaching $40/ton when the av. piece removed weighed 100lb. Estimates for complex harvest units could be prepared by treating them as composites of fan, parallel, and reverse fan unit.

Peter, P.A.; Baumgras, J.E.

1984-01-01T23:59:59.000Z

498

HYBRID SULFUR PROCESS REFERENCE DESIGN AND COST ANALYSIS  

SciTech Connect (OSTI)

This report documents a detailed study to determine the expected efficiency and product costs for producing hydrogen via water-splitting using energy from an advanced nuclear reactor. It was determined that the overall efficiency from nuclear heat to hydrogen is high, and the cost of hydrogen is competitive under a high energy cost scenario. It would require over 40% more nuclear energy to generate an equivalent amount of hydrogen using conventional water-cooled nuclear reactors combined with water electrolysis compared to the proposed plant design described herein. There is a great deal of interest worldwide in reducing dependence on fossil fuels, while also minimizing the impact of the energy sector on global climate change. One potential opportunity to contribute to this effort is to replace the use of fossil fuels for hydrogen production by the use of water-splitting powered by nuclear energy. Hydrogen production is required for fertilizer (e.g. ammonia) production, oil refining, synfuels production, and other important industrial applications. It is typically produced by reacting natural gas, naphtha or coal with steam, which consumes significant amounts of energy and produces carbon dioxide as a byproduct. In the future, hydrogen could also be used as a transportation fuel, replacing petroleum. New processes are being developed that would permit hydrogen to be produced from water using only heat or a combination of heat and electricity produced by advanced, high temperature nuclear reactors. The U.S. Department of Energy (DOE) is developing these processes under a program known as the Nuclear Hydrogen Initiative (NHI). The Republic of South Africa (RSA) also is interested in developing advanced high temperature nuclear reactors and related chemical processes that could produce hydrogen fuel via water-splitting. This report focuses on the analysis of a nuclear hydrogen production system that combines the Pebble Bed Modular Reactor (PBMR), under development by PBMR (Pty.) Ltd. in the RSA, with the Hybrid Sulfur (HyS) Process, under development by the Savannah River National Laboratory (SRNL) in the US as part of the NHI. This work was performed by SRNL, Westinghouse Electric Company, Shaw, PBMR (Pty) Ltd., and Technology Insights under a Technical Consulting Agreement (TCA). Westinghouse Electric, serving as the lead for the PBMR process heat application team, established a cost-shared TCA with SRNL to prepare an updated HyS thermochemical water-splitting process flowsheet, a nuclear hydrogen plant preconceptual design and a cost estimate, including the cost of hydrogen production. SRNL was funded by DOE under the NHI program, and the Westinghouse team was self-funded. The results of this work are presented in this Final Report. Appendices have been attached to provide a detailed source of information in order to document the work under the TCA contract.

Gorensek, M.; Summers, W.; Boltrunis, C.; Lahoda, E.; Allen, D.; Greyvenstein, R.

2009-05-12T23:59:59.000Z

499

Federal Geothermal Research Program Update, FY 2000  

SciTech Connect (OSTI)

The Department of Energy's Geothermal Program serves two broad purposes: 1) to assist industry in overcoming near-term barriers by conducting cost-shared research and field verification that allows geothermal energy to compete in today's aggressive energy markets; and 2) to undertake fundamental research with potentially large economic payoffs. The four categories of work used to distinguish the research activities of the Geothermal Program during FY 2000 reflect the main components of real-world geothermal projects. These categories form the main sections of the project descriptions in this Research Update. Exploration Technology research focuses on developing instruments and techniques to discover hidden hydrothermal systems and to explore the deep portions of known systems. Research in geophysical and geochemical methods is expected to yield increased knowledge of hidden geothermal systems. Reservoir Technology research combines laboratory and analytical investigations with equipment development and field testing to establish practical tools for resource development and management for both hydrothermal reservoirs and enhanced geothermal systems. Research in various reservoir analysis techniques is generating a wide range of information that facilitates development of improved reservoir management tools. Drilling Technology focuses on developing improved, economic drilling and completion technology for geothermal wells. Ongoing research to avert lost circulation episodes in geothermal drilling is yielding positive results. Conversion Technology research focuses on reducing costs and improving binary conversion cycle efficiency, to permit greater use of the more abundant moderate-temperature geothermal resource, and on the development of materials that will improve the operating characteristics of many types of geothermal energy equipment. Increased output and improved performance of binary cycles will result from investigations in heat cycle research.

Renner, Joel Lawrence

2001-08-01T23:59:59.000Z

500

Los Alamos National Laboratory Building Cost Index  

SciTech Connect (OSTI)

The Los Alamos National Laboratory Building Cost Index indicates that actual escalation since 1970 is near 10% per year. Therefore, the Laboratory will continue using a 10% per year escalation rate for construction estimates through 1985 and a slightly lower rate of 8% per year from 1986 through 1990. The computerized program compares the different elements involved in the cost of a typical construction project, which for our purposes, is a complex of office buildings and experimental laboratores. The input data used in the program consist primarily of labor costs and material and equipment costs. The labor costs are the contractural rates of the crafts workers in the Los Alamos area. For the analysis, 12 field-labor draft categories are used; each is weighted corresponding to the labor craft distribution associated with the typical construction project. The materials costs are current Los Alamos prices. Additional information sources include material and equipment quotes obtained through conversations with vendors and from trade publications. The material and equipment items separate into 17 categories for the analysis and are weighted corresponding to the material and equipment distribution associated with the typical construction project. The building cost index is compared to other national building cost indexes.

Orr, H.D.; Lemon, G.D.

1983-01-01T23:59:59.000Z