Sample records for updated capital cost

  1. Updated Capital Cost Estimates for Utility Scale Electricity

    E-Print Network [OSTI]

    Updated Capital Cost Estimates for Utility Scale Electricity Generating Plants April 2013 Information Administration | Updated Capital Cost Estimates for Utility Scale Electricity Generating Plants ii for Utility Scale Electricity Generating Plants ii Contents Introduction

  2. Cost of a Ride: The Effects of Densities on Fixed-Guideway Transit Ridership and Capital Costs

    E-Print Network [OSTI]

    Guerra, Erick; Cervero, Robert

    2010-01-01T23:59:59.000Z

    rail transit capital cost study update final. Washington,2005). Managing Capital Costs of Major Federally Fundedin US rail transit project cost overrun. Transportation

  3. Electric power substation capital costs

    SciTech Connect (OSTI)

    Dagle, J.E.; Brown, D.R.

    1997-12-01T23:59:59.000Z

    The displacement or deferral of substation equipment is a key benefit associated with several technologies that are being developed with the support of the US Department of Energy`s Office of Utility Technologies. This could occur, for example, as a result of installing a distributed generating resource within an electricity distribution system. The objective of this study was to develop a model for preparing preliminary estimates of substation capital costs based on rudimentary conceptual design information. The model is intended to be used by energy systems analysts who need ``ballpark`` substation cost estimates to help establish the value of advanced utility technologies that result in the deferral or displacement of substation equipment. This cost-estimating model requires only minimal inputs. More detailed cost-estimating approaches are recommended when more detailed design information is available. The model was developed by collecting and evaluating approximately 20 sets of substation design and cost data from about 10 US sources, including federal power marketing agencies and private and public electric utilities. The model is principally based on data provided by one of these sources. Estimates prepared with the model were compared with estimated and actual costs for the data sets received from the other utilities. In general, good agreement (for conceptual level estimating) was found between estimates prepared with the cost-estimating model and those prepared by the individual utilities. Thus, the model was judged to be adequate for making preliminary estimates of typical substation costs for US utilities.

  4. Best Practices for Controlling Capital Costs in Net Zero Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Best Practices for Controlling Capital Costs in Net Zero Energy Design and Construction - 2014 BTO Peer Review Best Practices for Controlling Capital Costs in Net Zero Energy...

  5. QGESS: Capital Cost Scaling Methodology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Planning and Analysis (ESPA) Peter Kabatek WorleyParsons Group, Inc. Alexander Zoelle Booz Allen Hamilton, Inc. DOE Contract Number DE-FE0004001 iv Cost and Performance Metrics...

  6. LIFE Cost of Electricity, Capital and Operating Costs

    SciTech Connect (OSTI)

    Anklam, T

    2011-04-14T23:59:59.000Z

    Successful commercialization of fusion energy requires economic viability as well as technical and scientific feasibility. To assess economic viability, we have conducted a pre-conceptual level evaluation of LIFE economics. Unit costs are estimated from a combination of bottom-up costs estimates, working with representative vendors, and scaled results from previous studies of fission and fusion plants. An integrated process model of a LIFE power plant was developed to integrate and optimize unit costs and calculate top level metrics such as cost of electricity and power plant capital cost. The scope of this activity was the entire power plant site. Separately, a development program to deliver the required specialized equipment has been assembled. Results show that LIFE power plant cost of electricity and plant capital cost compare favorably to estimates for new-build LWR's, coal and gas - particularly if indicative costs of carbon capture and sequestration are accounted for.

  7. Cost of a Ride: The Effects of Densities on Fixed-Guideway Transit Ridership and Capital Costs

    E-Print Network [OSTI]

    Guerra, Erick; Cervero, Robert

    2010-01-01T23:59:59.000Z

    transit – exceeded capital cost estimates by 40% duringfound that capital costs exceeded estimates by an averagesystems. We estimate the total capital cost, average weekday

  8. Updated Cost Analysis of Photobiological Hydrogen Production...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis of Photobiological Hydrogen Production from Chlamydomonas reinhardtii Green Algae: Milestone Completion Report Updated Cost Analysis of Photobiological Hydrogen...

  9. Is the Insurance Cost-of-Capital Fair? Mathieu Gatumel

    E-Print Network [OSTI]

    Boyer, Edmond

    companies or on the modelling of insurance business profit and loss. We estimate a cost-of-capital rateIs the Insurance Cost-of-Capital Fair? Mathieu Gatumel CAHIER DE RECHERCHE n°2011-07 E2 Unité Mixte the Insurance Cost-of-Capital Fair? MathieuMathieuMathieuMathieu GatumelGatumelGatumelGatumel University

  10. Updating MIT's cost estimation model for shipbuilding

    E-Print Network [OSTI]

    Smith, Matthew B., Lieutenant, junior grade

    2008-01-01T23:59:59.000Z

    This thesis project will update the MIT ship cost estimation model by combining the two existing models (the Basic Military Training School (BMTS) Cost Model and the MIT Math Model) in order to develop a program that can ...

  11. Valuing Rail Transit: Comparing Capital and Operating Costs to Consumer Benefits

    E-Print Network [OSTI]

    Guerra, Erick

    2010-01-01T23:59:59.000Z

    years gives an annual capital cost estimate of $321 million,further adjust the capital cost estimates for these systemscosts. In order to estimate capital costs for five systems

  12. On the relation between expected returns and implied cost of capital

    E-Print Network [OSTI]

    Hughes, John; Liu, Jing; Liu, Jun

    2009-01-01T23:59:59.000Z

    coef?cient estimate on implied cost of capital to be biased.the implied cost of capital literature estimates of the exestimates of ex ante risk premiums inferred from implied cost of capital

  13. Update on the Cost of Nuclear Power

    E-Print Network [OSTI]

    Parsons, John E.

    2009-01-01T23:59:59.000Z

    We update the cost of nuclear power as calculated in the MIT (2003) Future of Nuclear Power study. Our main focus is on the changing cost of construction of new plants. The MIT (2003) study provided useful data on the cost ...

  14. When Does Information Asymmetry Affect the Cost of Capital?

    E-Print Network [OSTI]

    Armstrong, Christopher S.

    This paper examines when information asymmetry among investors affects the cost of capital in excess of standard risk factors. When equity markets are perfectly competitive, information asymmetry has no separate effect on ...

  15. Fuel costs and the retirement of capital goods

    E-Print Network [OSTI]

    Goolsbee, Austan Dean

    1993-01-01T23:59:59.000Z

    This paper explores the effect that energy prices and market conditions have on the retirement rates of capital goods using new micro data on aircraft lifetimes and fuel costs. The oil shocks of the 1970s made fuel intensive ...

  16. Discrete Event Modeling of Algae Cultivation and Harvesting at Commercial Scale: Capital Costs, Operating Costs, and System Bottlenecks

    SciTech Connect (OSTI)

    Lacey, Ph.D, P.E., Ronald E. [Texas A& M University

    2012-07-16T23:59:59.000Z

    Discrete Event Modeling of Algae Cultivation and Harvesting at Commercial Scale: Capital Costs, Operating Costs, and System Bottlenecks

  17. Cost of a Ride: The Effects of Densities on Fixed-Guideway Transit Ridership and Capital Costs

    E-Print Network [OSTI]

    Guerra, Erick; Cervero, Robert

    2010-01-01T23:59:59.000Z

    mile. Soaring capital investment costs are today’ s biggestof riders for the investment costs? If so, what minimumrelationship between investment costs and urban densities

  18. Updating Texas Energy Cost Containment Audit Reports

    E-Print Network [OSTI]

    Burke, T. E.; Heffington, W. M.

    1989-01-01T23:59:59.000Z

    moneys in a program known as LoanSTAR. Due to the time between the audits and availability of funds, update of the reports for current energy and equipment cost, and for accomplishment of projects was necessary. Audits in 1984 and 1986 identified total...

  19. 2006 Update of Business Downtime Costs

    SciTech Connect (OSTI)

    Hinrichs, Mr. Doug [Sentech, Inc.; Goggin, Mr. Michael [Sentech, Inc.

    2007-01-01T23:59:59.000Z

    The objective of this paper is to assess the downtime cost of power outages to businesses in the commercial and industrial sectors, updating and improving upon studies that have already been published on this subject. The goal is to produce a study that, relative to existing studies, (1) applies to a wider set of business types (2) reflects more current downtime costs, (3) accounts for the time duration factor of power outages, and (4) includes data on the costs imposed by real outages in a well-defined market. This study examines power outage costs in 11 commercial subsectors and 5 industrial subsectors, using data on downtime costs that was collected in the 1990's. This study also assesses power outage costs for power outages of 20 minutes, 1 hour, and 4 hours duration. Finally, this study incorporates data on the costs of real power outages for two business subsectors. However, the current limited state of data availability on the topic of downtime costs means there is room to improve upon this study. Useful next steps would be to generate more recent data on downtime costs, data that covers outages shorter than 20 minutes duration and longer than 4 hours duration, and more data that is based on the costs caused by real-world outages. Nevertheless, with the limited data that is currently available, this study is able to generate a clear and detailed picture of the downtime costs that are faced by different types of businesses.

  20. Microsoft PowerPoint - Crouther - Human Capital Update

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_Cost Estimating Panel Microsoft PowerPoint -ofUpdates Presented to the

  1. Systematic methodology for estimating direct capital costs for blanket tritium processing systems

    SciTech Connect (OSTI)

    Finn, P.A.

    1985-01-01T23:59:59.000Z

    This paper describes the methodology developed for estimating the relative capital costs of blanket processing systems. The capital costs of the nine blanket concepts selected in the Blanket Comparison and Selection Study are presented and compared.

  2. Cost of Oil Dependence: A 2000 Update

    SciTech Connect (OSTI)

    Greene, D.L.; Tishchishyna, N.I.

    2000-05-01T23:59:59.000Z

    Oil dependence remains a potentially serious economic and strategic problem for the United States. This report updates previous estimates of the costs of oil dependence to the U.S. economy and introduces several methodological enhancements. Estimates of the costs to the U.S. economy of the oil market upheavals of the last 30 years are in the vicinity of $7 trillion, present value 1998 dollars, about as large as the sum total of payments on the national debt over the same period. Simply adding up historical costs in 1998 dollars without converting to present value results in a Base Case cost estimate of $3.4 trillion. Sensitivity analysis indicates that cost estimates are sensitive to key parameters. A lower bound estimate of $1.7 trillion and an upper bound of $7.1 trillion (not present value) indicate that the costs of oil dependence have been large under almost any plausible set of assumptions. These cost estimates do not include military, strategic or political costs associated with U.S. and world dependence on oil imports.

  3. Costs of Oil Dependence: A 2000 Update

    SciTech Connect (OSTI)

    Greene, D.L.

    2000-05-17T23:59:59.000Z

    Oil dependence remains a potentially serious economic and strategic problem for the United States. This report updates previous estimates of the costs of oil dependence to the U.S. economy and introduces several methodological enhancements. Estimates of the costs to the U.S. economy of the oil market upheavals of the last 30 years are in the vicinity of $7 trillion, present value 1998 dollars, about as large as the sum total of payments on the national debt over the same period. Simply adding up historical costs in 1998 dollars without converting to present value results in a Base Case cost estimate of $3.4 trillion. Sensitivity analysis indicates that cost estimates are sensitive to key parameters. A lower bound estimate of $1.7 trillion and an upper bound of $7.1 trillion (not present value) indicate that the costs of oil dependence have been large under almost any plausible set of assumptions. These cost estimates do not include military, strategic or political costs associated with U.S. and world dependence on oil imports.

  4. Does Corporate Social Responsibility Affect the Cost of Capital? * Sadok El Ghoul

    E-Print Network [OSTI]

    Saskatchewan, University of

    capital for a large sample of U.S. firms. Using several approaches to estimate firms' ex ante costDoes Corporate Social Responsibility Affect the Cost of Capital? * Sadok El Ghoul University the effect of corporate social responsibility (CSR) on the cost of equity capital for a large sample of U

  5. Accessing Low-Cost Capital Through Securitization (Poster)

    SciTech Connect (OSTI)

    Mendelsohn, M.

    2014-10-01T23:59:59.000Z

    Poster for Solar Power International conference presents information on NREL's effort to open capital markets through securitization via Solar Access to Public Capital (SAPC) working group's efforts.

  6. A capital cost comparison of commercial ground-source heat pump systems

    SciTech Connect (OSTI)

    Rafferty, K.

    1994-06-01T23:59:59.000Z

    The report provides a capital cost comparison of commercial ground source heat pump systems. The study includes groundwater systems, ground-coupled systems and hybrid systems.

  7. Using Pinch Technology to Explore Trade-Offs Between Energy Cost, Capital Cost, Process Modifications, and Utility Selection 

    E-Print Network [OSTI]

    McMullan, A. S.

    1988-01-01T23:59:59.000Z

    on the total cost of installing and operatlng a process. Understanding the impact of these decisions in the context of the overall process can lead to significant savings in both capital and operating costs. Full investigation of these interactions through...

  8. Investment and the Cost of Capital in the Nineties in France: A Panel Data Investigation

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Investment and the Cost of Capital in the Nineties in France: A Panel Data Investigation by Jean Genehmigung des ifo Instituts. #12;Investment and the Cost of Capital in the Nineties in France: A Panel Data of Firms III. Data and Econometric Results IV. Conclusion I. Introduction It is a widespread belief among

  9. Capital, labor, and energy cost prediction in timber harvesting: a microcomputer solution

    E-Print Network [OSTI]

    Kusmertz, Timothy Jon

    1983-01-01T23:59:59.000Z

    Organization Capital. 17 17 Labor 22 Energy. III. CAPITAL COST CALCULATION. 22 25 Depreciation. Taxes, Insurance, and Interest. 25 30 IV. LABOR COST CALCULATION. 36 Nages and Salaries. Fringe Benefits. 36 38 Chapter Page V. ENERGY COST... Summary for Champion International Corporation's Harvesting Unit g2 60 15 List of Equipment in Champion's Harvesting Unit N2 61 Table page 16 Breakdown of Workers in Champion's Harvesting Unit 42 and Their Respective Salary or Wage. . 62 17 Monthly...

  10. Some Observations on Energy Efficiency and Capital Cost

    E-Print Network [OSTI]

    Kenney, W. F.

    1982-01-01T23:59:59.000Z

    be required. This paper explores several cases where energy efficiency was improved with no increase in total plant capital (including the energy system). Cogeneration, driver selection and direct exchange are discussed. To explore the limitations...

  11. Updated Capital Cost Estimates for Utility Scale Electricity...

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    turbines, and other auxiliary equipment * Electrical and instrumentation and control: electrical transformers, switchgear, motor control centers, switchyards, distributed...

  12. Updated Capital Cost Estimates for Utility Scale Electricity Generating Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTownDells,1Stocks Nov-14TotalThe Outlook269,023Year69,023USWNCFeet)

  13. Developing a Cost Model and Methodology to Estimate Capital Costs for Thermal Energy Storage

    SciTech Connect (OSTI)

    Glatzmaier, G.

    2011-12-01T23:59:59.000Z

    This report provides an update on the previous cost model for thermal energy storage (TES) systems. The update allows NREL to estimate the costs of such systems that are compatible with the higher operating temperatures associated with advanced power cycles. The goal of the Department of Energy (DOE) Solar Energy Technology Program is to develop solar technologies that can make a significant contribution to the United States domestic energy supply. The recent DOE SunShot Initiative sets a very aggressive cost goal to reach a Levelized Cost of Energy (LCOE) of 6 cents/kWh by 2020 with no incentives or credits for all solar-to-electricity technologies.1 As this goal is reached, the share of utility power generation that is provided by renewable energy sources is expected to increase dramatically. Because Concentrating Solar Power (CSP) is currently the only renewable technology that is capable of integrating cost-effective energy storage, it is positioned to play a key role in providing renewable, dispatchable power to utilities as the share of power generation from renewable sources increases. Because of this role, future CSP plants will likely have as much as 15 hours of Thermal Energy Storage (TES) included in their design and operation. As such, the cost and performance of the TES system is critical to meeting the SunShot goal for solar technologies. The cost of electricity from a CSP plant depends strongly on its overall efficiency, which is a product of two components - the collection and conversion efficiencies. The collection efficiency determines the portion of incident solar energy that is captured as high-temperature thermal energy. The conversion efficiency determines the portion of thermal energy that is converted to electricity. The operating temperature at which the overall efficiency reaches its maximum depends on many factors, including material properties of the CSP plant components. Increasing the operating temperature of the power generation system leads to higher thermal-to-electric conversion efficiency. However, in a CSP system, higher operating temperature also leads to greater thermal losses. These two effects combine to give an optimal system-level operating temperature that may be less than the upper operating temperature limit of system components. The overall efficiency may be improved by developing materials, power cycles, and system-integration strategies that enable operation at elevated temperature while limiting thermal losses. This is particularly true for the TES system and its components. Meeting the SunShot cost target will require cost and performance improvements in all systems and components within a CSP plant. Solar collector field hardware will need to decrease significantly in cost with no loss in performance and possibly with performance improvements. As higher temperatures are considered for the power block, new working fluids, heat-transfer fluids (HTFs), and storage fluids will all need to be identified to meet these new operating conditions. Figure 1 shows thermodynamic conversion efficiency as a function of temperature for the ideal Carnot cycle and 75% Carnot, which is considered to be the practical efficiency attainable by current power cycles. Current conversion efficiencies for the parabolic trough steam cycle, power tower steam cycle, parabolic dish/Stirling, Ericsson, and air-Brayton/steam Rankine combined cycles are shown at their corresponding operating temperatures. Efficiencies for supercritical steam and carbon dioxide (CO{sub 2}) are also shown for their operating temperature ranges.

  14. Using Pinch Technology to Explore Trade-Offs Between Energy Cost, Capital Cost, Process Modifications, and Utility Selection

    E-Print Network [OSTI]

    McMullan, A. S.

    , energy cost, process modifications and utility selection. The application of Pinch' Technology to a Chemi-Thermo Mechanical Pulping process is used to illustrate the approach and the results. INTRODUCTION The general approach to process design.... AN EXAMPLE - THE CTMP PROCESS The Chemi-Thermo Mechanical Pulping (CTMP) process will be used as an example to illustrate how process modifications and utility selection impact total capital and operating costs. For each of the possible process...

  15. User's manual for the INDCEPT code for estimating industrial steam boiler plant capital investment costs

    SciTech Connect (OSTI)

    Bowers, H I; Fuller, L C; Hudson, II, C R

    1982-09-01T23:59:59.000Z

    The INDCEPT computer code package was developed to provide conceptual capital investment cost estimates for single- and multiple-unit industrial steam boiler plants. Cost estimates can be made as a function of boiler type, size, location, and date of initial operation. The output includes a detailed breakdown of the estimate into direct and indirect costs. Boiler plant cost models are provided to reflect various types and sources of coal and alternate means of sulfur and particulate removal. Cost models are also included for low-Btu and medium-Btu gas produced in coal gasification plants.

  16. Wind-To-Hydrogen Project: Electrolyzer Capital Cost Study

    SciTech Connect (OSTI)

    Saur, G.

    2008-12-01T23:59:59.000Z

    This study is being performed as part of the U.S. Department of Energy and Xcel Energy's Wind-to-Hydrogen Project (Wind2H2) at the National Renewable Energy Laboratory. The general aim of the project is to identify areas for improving the production of hydrogen from renewable energy sources. These areas include both technical development and cost analysis of systems that convert renewable energy to hydrogen via water electrolysis. Increased efficiency and reduced cost will bring about greater market penetration for hydrogen production and application. There are different issues for isolated versus grid-connected systems, however, and these issues must be considered. The manner in which hydrogen production is integrated in the larger energy system will determine its cost feasibility and energy efficiency.

  17. Controlling Capital Costs in High Performance Office Buildings: A Review of Best Practices for Overcoming Cost Barriers

    SciTech Connect (OSTI)

    Pless, S.; Torcellini, P.

    2012-05-01T23:59:59.000Z

    This paper presents a set of 15 best practices for owners, designers, and construction teams of office buildings to reach high performance goals for energy efficiency, while maintaining a competitive budget. They are based on the recent experiences of the owner and design/build team for the Research Support Facility (RSF) on National Renewable Energy Facility's campus in Golden, CO, which show that achieving this outcome requires each key integrated team member to understand their opportunities to control capital costs.

  18. Costs of U.S. Oil Dependence: 2005 Update

    SciTech Connect (OSTI)

    Greene, D.L.

    2005-03-08T23:59:59.000Z

    For thirty years, dependence on oil has been a significant problem for the United States. Oil dependence is not simply a matter of how much oil we import. It is a syndrome, a combination of the vulnerability of the U.S. economy to higher oil prices and oil price shocks and a concentration of world oil supplies in a small group of oil producing states that are willing and able to use their market power to influence world oil prices. Although there are vitally important political and military dimensions to the oil dependence problem, this report focuses on its direct economic costs. These costs are the transfer of wealth from the United States to oil producing countries, the loss of economic potential due to oil prices elevated above competitive market levels, and disruption costs caused by sudden and large oil price movements. Several enhancements have been made to methods used in past studies to estimate these costs, and estimates of key parameters have been updated based on the most recent literature. It is estimated that oil dependence has cost the U.S. economy $3.6 trillion (constant 2000 dollars) since 1970, with the bulk of the losses occurring between 1979 and 1986. However, if oil prices in 2005 average $35-$45/bbl, as recently predicted by the U.S. Energy Information Administration, oil dependence costs in 2005 will be in the range of $150-$250 billion. Costs are relatively evenly divided between the three components. A sensitivity analysis reflecting uncertainty about all the key parameters required to estimate oil dependence costs suggests that a reasonable range of uncertainty for the total costs of U.S. oil dependence over the past 30 years is $2-$6 trillion (constant 2000 dollars). Reckoned in terms of present value using a discount rate of 4.5%, the costs of U.S. oil dependence since 1970 are $8 trillion, with a reasonable range of uncertainty of $5 to $13 trillion.

  19. ORNL/TM-2005/45 COSTS OF U.S. OIL DEPENDENCE: 2005 UPDATE

    E-Print Network [OSTI]

    ORNL/TM-2005/45 COSTS OF U.S. OIL DEPENDENCE: 2005 UPDATE David L. Greene Oak Ridge National. DEFINITION OF THE ECONOMIC COSTS OF OIL DEPENDENCE .....................7 3.1 DEFINITION OF OIL DEPENDENCE..................................................................7 3.2 TYPES AND MEASUREMENT OF OIL COSTS.................................................7 3

  20. Costs to Maryland utilities and ratepayers of an acid-rain control strategy: an update analysis

    SciTech Connect (OSTI)

    Kahal, M.I.

    1988-03-01T23:59:59.000Z

    In 1985, the Power Plant Research Program (PPRP) published a study that developed estimates of cost and electric-rate impacts for a hypothetical control scenario for each major electric utility operating in the State. This report updates that earlier study by incorporating new information. Important differences include revised financial/accounting assumptions, a decline in the cost premium for low-sulfur coal, increases in scrubber construction costs and changes in control strategies. Also, the update incorporates control of NOx emissions. The original study was limited to evaluating the costs of controlling sulfur-emissions only.

  1. Energy storage systems cost update : a study for the DOE Energy Storage Systems Program.

    SciTech Connect (OSTI)

    Schoenung, Susan M. (Longitude 122 West, Menlo Park, CA)

    2011-04-01T23:59:59.000Z

    This paper reports the methodology for calculating present worth of system and operating costs for a number of energy storage technologies for representative electric utility applications. The values are an update from earlier reports, categorized by application use parameters. This work presents an update of energy storage system costs assessed previously and separately by the U.S. Department of Energy (DOE) Energy Storage Systems Program. The primary objective of the series of studies has been to express electricity storage benefits and costs using consistent assumptions, so that helpful benefit/cost comparisons can be made. Costs of energy storage systems depend not only on the type of technology, but also on the planned operation and especially the hours of storage needed. Calculating the present worth of life-cycle costs makes it possible to compare benefit values estimated on the same basis.

  2. Valuing Rail Transit: Comparing Capital and Operating Costs to Consumer Benefits

    E-Print Network [OSTI]

    Guerra, Erick

    2010-01-01T23:59:59.000Z

    D.C. , 1994; Booz Allen Hamilton, Inc. Light rail transitD.C. , 2003; Booz Allen Hamilton, Inc. , Managing Capital

  3. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2008 Update

    Fuel Cell Technologies Publication and Product Library (EERE)

    This report estimates fuel cell system cost for systems produced in the years 2006, 2010, and 2015, and is the second annual update of a comprehensive automotive fuel cell cost analysis.

  4. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2009 Update

    Fuel Cell Technologies Publication and Product Library (EERE)

    This report is the third annual update of a comprehensive automotive fuel cell cost analysis. It contains estimates for material and manufacturing cost of complete 80 kWnet direct hydrogen proton exch

  5. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2007 Update

    Fuel Cell Technologies Publication and Product Library (EERE)

    This report estimates fuel cell system cost for systems produced in the years 2007, 2010, and 2015, and is the first annual update of a comprehensive automotive fuel cell cost analysis.

  6. Mass Production Cost Estimation For Direct H2 PEM Fuel Cell Systesm for Automotive Applications: 2010 Update

    Fuel Cell Technologies Publication and Product Library (EERE)

    This report is the fourth annual update of a comprehensive automotive fuel cell cost analysis. It contains estimates for material and manufacturing costs of complete 80 kWnet direct?hydrogen proton ex

  7. Updated cost estimates of meeting geothermal hydrogen sulfide emission regulations

    SciTech Connect (OSTI)

    Wells, K.D.; Currie, J.W.; Weakley, S.A.; Ballinger, M.Y.

    1981-08-01T23:59:59.000Z

    A means of estimating the cost of hydrogen sulfide (H/sub 2/S) emission control was investigated. This study was designed to derive H/sub 2/S emission abatement cost functions and illustrate the cost of H/sub 2/S emission abatement at a hydrothermal site. Four tasks were undertaken: document the release of H/sub 2/S associated with geothermal development; review H/sub 2/S environmental standards; develop functional relationships that may be used to estimate the most cose-effective available H/sub 2/S abatement process; and use the cost functions to generate abatement cost estimates for a specific site. The conclusions and recommendations derived from the research are presented. The definition of the term impacts as used in this research is discussed and current estimates of the highest expected H/sub 2/S concentrations of in geothermal reservoirs are provided. Regulations governing H/sub 2/S emissions are reviewed and a review of H/sub 2/S control technology and a summary of the control cost functions are included. A case study is presented to illustrate H/sub 2/S abatement costs at the Baca KGRA in New Mexico.

  8. Updated Buildings Sector Appliance and Equipment Costs and Efficiency

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto17 34 44Year Jan Feb MarDecadeFour-Dimensional2009 2010Updated

  9. Updated Costs (June 2011 Basis) for Selected Bituminous Baseline...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Date:2011-Oct-17 Project: Bituminous Baseline Study Case: Case 1 GEE Radiant IGCC wo CO2 Plant Size: 622.1 MW,net Estimate Type: Conceptual Cost Base (Jun) 2011 (x1000) Acct...

  10. FACILITIES ENGINEER WEST CHICAGO Execute capital projects for manufacturing facilities and utilities systems: scope development, cost

    E-Print Network [OSTI]

    Heller, Barbara

    FACILITIES ENGINEER ­ WEST CHICAGO OVERVIEW: Execute capital projects for manufacturing, and externally. Additional duties as assigned. QUALIFICATIONS: BS in Engineering from ABETaccredited program, or PE certification, required. 5+ years of experience in manufacturing engineering environment

  11. Types of Costs Types of Cost Estimates

    E-Print Network [OSTI]

    Boisvert, Jeff

    05-1 · Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408-Revenue Relationships · Capital Costs (or first cost or capital investment): ­ Expenditures made to acquire or develop capital assets ­ Three main classes of capital costs: 1. Depreciable Investment: · Investment allocated

  12. Table 1. Updated estimates of power plant capital and operating costs

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTownDells,1Stocks Nov-14 Dec-14TableConference |6:Welcome toU.S.

  13. Rail costs and capital adjustments in a quasi-regulated environment

    E-Print Network [OSTI]

    Friedlaender, Ann Fetter

    1990-01-01T23:59:59.000Z

    This paper reports on results obtained from estimation of a rail cost function using a pooled time-series cross section of Class I U.S. railroads for the period 1973-1986. Based on the results of this cost function, an ...

  14. EXPERT ELICITATION OF ACROSS-TECHNOLOGY CORRELATIONS FOR REACTOR CAPITAL COSTS

    SciTech Connect (OSTI)

    Brent Dixon; Various

    2014-06-01T23:59:59.000Z

    Calculations of the uncertainty in the Levelized Cost at Equilibrium (LCAE) of generating nuclear electricity typically assume that the costs of the system component, notably reactors, are uncorrelated. Partial cancellation of independent errors thus gives rise to unrealistically small cost uncertainties for fuel cycles that incorporate multiple reactor technologies. This summary describes an expert elicitation of correlations between overnight reactor construction costs. It also defines a method for combining the elicitations into a single, consistent correlation matrix suitable for use in Monte Carlo LCAE calculations. Both the elicitation and uncertainty propagation methods are demonstrated through a pilot study where cost correlations between eight reactor technologies were elicited from experts in the US DOE Fuel Cycle Research

  15. ANALYSIS OF THE PERFORMANCE AND COST EFFECTIVENESS OF NINE SMALL WIND ENERGY CONVERSION SYSTEMS FUNDED BY THE DOE SMALL GRANTS PROGRAM

    E-Print Network [OSTI]

    Kay, J.

    2009-01-01T23:59:59.000Z

    1981), Power Plant Cost Escalation: Coal, Capital Costs,1981), Power Plant Cost Escalation: Nuclear Coal, Capital

  16. Reducing Energy Costs And Minimizing Capital Requirements: Case Studies of Thermal Energy Storage (TES)

    E-Print Network [OSTI]

    Andrepont, J. S.

    2007-01-01T23:59:59.000Z

    , and thus during those times when power has its highest cost or value. Thermal Energy Storage (TES) provides a means of de-coupling the generation of cooling from the provision of cooling to the peak cooling loads. In this manner, peak power demand...

  17. Impact on the steam electric power industry of deleting Section 316(a) of the Clean Water Act: Capital costs

    SciTech Connect (OSTI)

    Veil, J.A.

    1993-01-01T23:59:59.000Z

    Many power plants discharge large volumes of cooling water. In some cases, the temperature of the discharge exceeds state thermal requirements. Section 316(a) of the Clean Water Act (CWA) allows a thermal discharger to demonstrate that less stringent thermal effluent limitations would still protect aquatic life. About 32% of total US steam electric generating capacity operates under Section 316(a) variances. In 1991, the US Senate proposed legislation that would delete Section 316(a) from the CWA. This study, presented in two companion reports, examines how this legislation would affect the steam electric power industry. This report describes alternatives available to nuclear and coal-fired plants currently operating under variances. Data from 38 plants representing 14 companies are used to estimate the national cost of implementing such alternatives. Although there are other alternatives, most affected plants would be retrofitted with cooling towers. Assuming that all plants currently operating under variances would install cooling towers, the national capital cost estimate for these retrofits ranges from $22.7 billion to $24.4 billion (in 1992 dollars). The second report quantitatively and qualitatively evaluates the energy and environmental impacts of deleting the variance. Little justification has been found for removing the Section 316(a) variance from the CWA.

  18. Operating Costs Estimates Cost Indices

    E-Print Network [OSTI]

    Boisvert, Jeff

    to update costs of specific equipment, raw material or labor or CAPEX and OPEX of entire plants Cost Indices

  19. Types of Costs Types of Cost Estimates

    E-Print Network [OSTI]

    Boisvert, Jeff

    · Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408: Mining% accuracy. ­ 2-5% of pre-production capital Types of Cost Estimates #12;3. Definitive ­ Based on definitive-even $ Production Level Fixed Cost Break-even $ Production Level Cost-Revenue Relationships · Capital Costs (or

  20. Cost of Capital

    Broader source: Energy.gov [DOE]

    This presentation summarizes the information given by PV Evolution Labs during the DOE SunShot Grand Challenge: Summit and Technology Forum, June 13-14, 2012.

  1. Cost of Capital and Regulator’s Preferences: Investigation into a new method of estimating regulatory bias

    E-Print Network [OSTI]

    Sancetta, Alessio; Satchell, Stephen E

    When computing regulated prices, the standard method is the capital asset pricing model (CAPM) which involves the estimation of a single parameter: the beta of the company. Yet, these computational methods fail to take into account any preference...

  2. Fourth update of the Energy Economic Data Base (EEDB) Program. Phase IV, Final report. Volume I

    SciTech Connect (OSTI)

    Allen, R.E.; Brown, P.E.; Kaminski, R.S.; Smith, M.H.; Ziegler, E.J.

    1981-09-01T23:59:59.000Z

    EEDB deals with the development of cost data for nuclear and comparison electric power plants. Its objective is to provide periodic updates of technical and cost (capital, fuel and operating and maintenance) information for use in evaluating and monitoring US civilian nuclear power programs. It contains six nuclear power plant technical models and five comparison coal-fired fossil power plant technical models. (DLC)

  3. Future Impacts of Coal Distribution Constraints on Coal Cost

    E-Print Network [OSTI]

    McCollum, David L

    2007-01-01T23:59:59.000Z

    coal-to-hydrogen plant capital costs .Capital cost of pulverized coal plant ($/kW) Capital cost ofIGCC coal plant ($/kW) Capital cost of repowering PC plant

  4. HIGH SPEED RAIL COSTS, BENEFITS, AND FINANCING RAYMOND H. ELLIS

    E-Print Network [OSTI]

    Bustamante, Fabián E.

    Corridor PHASE 1 ­ TAMPA TO ORLANDO #12;FLORIDA TAMPA ­ ORLANDO (PHASE 1) HSR CAPITAL COST · Estimated Incremental Capital Cost Capital Cost Year of (Billions (Billions Completion Expenditure Section 2010$) 2010$) of Section Capital Cost #12;CALIFORNIA HIGH SPEED RAIL PHASE 1 CAPITAL COSTS SECTION INCREMENTAL CAPITAL

  5. Operating Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

  6. Updated U.S. Geothermal Supply Characterization and Representation for Market Penetration Model Input

    SciTech Connect (OSTI)

    Augustine, C.

    2011-10-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) Geothermal Technologies Program (GTP) tasked the National Renewable Energy Laboratory (NREL) with conducting the annual geothermal supply curve update. This report documents the approach taken to identify geothermal resources, determine the electrical producing potential of these resources, and estimate the levelized cost of electricity (LCOE), capital costs, and operating and maintenance costs from these geothermal resources at present and future timeframes under various GTP funding levels. Finally, this report discusses the resulting supply curve representation and how improvements can be made to future supply curve updates.

  7. Use of experience curves to estimate the future cost of power plants with CO2 capture

    E-Print Network [OSTI]

    Rubin, Edward S.; Yeh, Sonia; Antes, Matt; Berkenpas, Michael; Davison, John

    2007-01-01T23:59:59.000Z

    and storage costs) Technology Cost of electricity (excludingstages of commercialization Technology Capital cost Flue gasPlant type and technology Capital cost $/kW NGCC plant

  8. System design study to reduce capital and operating cost of a moving distributor, AFB advanced concept - comparison with an oil-fired boiler. Final report

    SciTech Connect (OSTI)

    Mah, C.S.; West, L.K.; Anderson, R.E.; Berkheimer, I.L.; Cahill, D.V.

    1985-12-01T23:59:59.000Z

    The Aerojet Energy Conversion Company, under contract with the United States Department of Energy, has performed a comparative economic study of the Aerojet Universal Atmospheric Fluidized Bed Combustion (UAFBC) system and a coventional atmospheric fluidized bed combustion (AFBC) system. The program title, ''System Design Study to Reduce Capital and Operating Cost and Bench Scale Testing of a Moving Distributor, AFB Concept,'' is a good description of the general objective of the program. The specific objective was to compare the UAFBC with the conventional AFBC in terms of normalized steam cost. The boilers were designed for 150,00 lb/hr of steam at 650 psig and 750/sup 0/F. The reference coal used in the analysis was Pittsburgh No. 8 coal with a sulfur content of 4.3% and a higher heating value of 12,919 Bru/lb. The analysis assumed a plant life of 20 years and a discount rate of 15%. The UAFBC systems included the usual elements of the conventional cola-fired AFBC steam plant, but the coal preparation sysbsystem for the UAFBC was considerably simpler because the system can use ''run-of-mine'' coal. The UAFBC boiler itself consisted of a staged-combustion fluidized-bed, superimposed over a static bed, the latter supported by a moving distributor. It incorporated a fines burnup combustor, an entrained reciculating gas cleanup bed, and conventional convection boiler. The key features of the UAFBC design were: High fuel flexibility; low NO/sub x/ emission; and superior turndown capability. 30 refs., 52 figs., 12 tabs.

  9. The University of Northern British Columbia Five Year Capital Plan

    E-Print Network [OSTI]

    Northern British Columbia, University of

    and for the regional campuses; · To estimate the cost of the recommended capital projects and to identify preferred its scope to recommending new capital projects with an estimated cost exceeding $1M. Other yet-to- be-completed capital projects with a cost below $1M previously reported to government are listed in Appendix 2

  10. Hydrogen Pathways: Updated Cost, Well-to-Wheels Energy Use, and Emissions for the Current Technology Status of Ten Hydrogen Production, Delivery, and Distribution Scenarios

    SciTech Connect (OSTI)

    Ramsden, T.; Ruth, M.; Diakov, V.; Laffen, M.; Timbario, T. A.

    2013-03-01T23:59:59.000Z

    This report describes a life-cycle assessment conducted by the National Renewable Energy Laboratory (NREL) of 10 hydrogen production, delivery, dispensing, and use pathways that were evaluated for cost, energy use, and greenhouse gas (GHG) emissions. This evaluation updates and expands on a previous assessment of seven pathways conducted in 2009. This study summarizes key results, parameters, and sensitivities to those parameters for the 10 hydrogen pathways, reporting on the levelized cost of hydrogen in 2007 U.S. dollars as well as life-cycle well-to-wheels energy use and GHG emissions associated with the pathways.

  11. QGESS: Capital Cost Scaling Methodology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah47,193.70COMMUNITY AEROSOL: ShalePutting! ! NERSC ! Q Q U U A A L

  12. QGESS: Capital Cost Scaling Methodology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah47,193.70COMMUNITY AEROSOL: ShalePutting! ! NERSC ! Q Q U U A A

  13. Capitalize on Existing Assets with Demand Response

    E-Print Network [OSTI]

    Collins, J.

    2008-01-01T23:59:59.000Z

    Industrial facilities universally struggle with escalating energy costs. EnerNOC will demonstrate how commercial, industrial, and institutional end-users can capitalize on their existing assets—at no cost and no risk. Demand response, the voluntary...

  14. Hydrogen refueling station costs in Shanghai

    E-Print Network [OSTI]

    Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

    2007-01-01T23:59:59.000Z

    total installed capital cost (TIC) 1% Of TIC 25% Estimate ofcost estimates for six station types SMR 100 a Equipment capital

  15. Phase II final report and second update of the energy economic data base (EEDB) program. Volume 1 of 1

    SciTech Connect (OSTI)

    Not Available

    1981-04-01T23:59:59.000Z

    The Energy Economic Data Base (EEDB) Program deals with the development of cost data for nuclear and comparison electric power generating stations. The objective of the USDOE EEDB Program is to provide periodic updates of technical and cost (capital, fuel and operating and maintenance) information of significance to the US Department of Energy. This information is intended to be used by USDOE in evaluating and monitoring US Civilian nuclear power programs, and to provide them with a consistent means of evaluating the nuclear option against alternatives. This report presents the Second Update of the EEDB for a cost and regulation date of January 1, 1979, prepared during Phase II of the EEDB Program. The Second Update is the first of a series of periodic updates marking the beginning of the next step in meeting the objective of the EEDB Program.

  16. EUV lithography cost of ownership analysis

    SciTech Connect (OSTI)

    Hawryluk, A.M.; Ceglio, N.M.

    1995-01-19T23:59:59.000Z

    The cost of fabricating state-of-the-art integrated circuits (ICs) has been increasing and it will likely be economic rather than technical factors that ultimately limit the progress of ICs toward smaller devices. It is estimated that lithography currently accounts for approximately one-third the total cost of fabricating modem ICs({sup 1}). It is expected that this factor will be fairly stable for the forseeable future, and as a result, any lithographic process must be cost-effective before it can be considered for production. Additionally, the capital equipment cost for a new fabrication facility is growing at an exponential rate (2); it will soon require a multibillion dollar investment in capital equipment alone to build a manufacturing facility. In this regard, it is vital that any advanced lithography candidate justify itself on the basis of cost effectiveness. EUV lithography is no exception and close attention to issues of wafer fabrication costs have been a hallmark of its early history. To date, two prior cost analyses have been conducted for EUV lithography (formerly called {open_quotes}Soft X-ray Projection Lithography{close_quotes}). The analysis by Ceglio, et. al., provided a preliminary system design, set performance specifications and identified critical technical issues for cost control. A follow-on analysis by Early, et.al., studied the impact of issues such as step time, stepper overhead, tool utilization, escalating photoresist costs and limited reticle usage on wafer exposure costs. This current study provides updated system designs and specifications and their impact on wafer exposure costs. In addition, it takes a first cut at a preliminary schematic of an EUVL fabrication facility along with an estimate of the capital equipment costs for such a facility.

  17. Hydrogen Refueling Station Costs in Shanghai

    E-Print Network [OSTI]

    Weinert, Jonathan X.; Shaojun, Liu; Ogden, J; Jianxin, Ma

    2006-01-01T23:59:59.000Z

    04 Hydrogen Refueling Station Costs in Shanghai Jonathan X.Hydrogen Refueling Station Costs in Shanghai Jonathan X.voltage connections) Capital costs for this equipment must

  18. Hydrogen refueling station costs in Shanghai

    E-Print Network [OSTI]

    Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

    2007-01-01T23:59:59.000Z

    Kingdom; 2004. [8] Amos W. Costs of storing and transportingcon- nections). Capital costs for this equipment must bein an analysis of station costs. Total station construction

  19. Hydrogen Refueling Station Costs in Shanghai

    E-Print Network [OSTI]

    Weinert, Jonathan X.; Shaojun, Liu; Ogden, J; Jianxin, Ma

    2006-01-01T23:59:59.000Z

    systems in China, particularly for the cost of hydrogenthe capital cost for equipment imported to China. Hydrogenestate costs in Shanghai are among the highest in China. $

  20. An Assessment of the Near-Term Costs of Hydrogen Refueling Stations and Station Components

    E-Print Network [OSTI]

    Lipman, T E; Weinert, Jonathan X.

    2006-01-01T23:59:59.000Z

    Installed Capital Figure 4-21: Cost Estimates for 1,000 kg/station. H2Gen’s estimates for capital costs are also lowerestimates and show high variability (26%-117% of capital costs).

  1. Opportunity for feedback Opportunity for updates

    E-Print Network [OSTI]

    Opportunity for feedback Opportunity for updates Opportunity to find out all of the things I don) What do these all mean? Vision (1) Values (5-10) Strategic Priorities (5-7) Education, scholarship update Research Plan Pinnacles or not? Focus on impact Update every 3 yrs Capital Plan Existing

  2. Avoided Gigawatts Through Utility Capital Recovery Fees

    E-Print Network [OSTI]

    Frosenfeld, A. N.; Verdict, M. E.

    1985-01-01T23:59:59.000Z

    structure is possible through the use of capital recovery fees for new electric meter hookups similar to those commonly used for new water and wastewater hookups where the developer/owner is required to capitalize the marginal cost of new demand. By giving...

  3. Costs and Benefits of Renewables Portfolio Standards in the United States

    E-Print Network [OSTI]

    Barbose, Galen

    2014-01-01T23:59:59.000Z

    Interagency Working Group on Social Cost of Carbon (2013).Technical Update of the Social Cost of Carbon for Regulatorytechnical-update-social-cost-of-carbon-for-regulator-

  4. The Costs and Benefits of Compliance with Renewable Portfolio Standards: Reviewing Experience to Date

    E-Print Network [OSTI]

    Heeter, Jenny

    2014-01-01T23:59:59.000Z

    Interagency Working Group on Social Cost of Carbon (2013).Technical Update of the Social Cost of Carbon for Regulatorytechnical-update-social-cost-of-carbon- for-regulator-

  5. Weighing the Costs and Benefits of Renewables Portfolio Standards: A Comparative Analysis of State-Level Policy Impact Projections

    E-Print Network [OSTI]

    Chen, Cliff; Wiser, Ryan; Bolinger, Mark

    2007-01-01T23:59:59.000Z

    data, the highest capital cost estimate in the 2010-2015multiply initial capital cost estimates by up to a factor ofand projected wind capital cost estimates from EPRI/DOE

  6. Improving the thermal integrity of new single-family detached residential buildings: Documentation for a regional database of capital costs and space conditioning load savings

    SciTech Connect (OSTI)

    Koomey, J.G.; McMahon, J.E.; Wodley, C.

    1991-07-01T23:59:59.000Z

    This report summarizes the costs and space-conditioning load savings from improving new single-family building shells. It relies on survey data from the National Association of Home-builders (NAHB) to assess current insulation practices for these new buildings, and NAHB cost data (aggregated to the Federal region level) to estimate the costs of improving new single-family buildings beyond current practice. Space-conditioning load savings are estimated using a database of loads for prototype buildings developed at Lawrence Berkeley Laboratory, adjusted to reflect population-weighted average weather in each of the ten federal regions and for the nation as a whole.

  7. Comparing Life-Cycle Costs of ESPCs and Appropriations-Funded Energy Projects: An Update to the 2002 Report

    SciTech Connect (OSTI)

    Shonder, John A [ORNL; Hughes, Patrick [ORNL; Atkin, Erica [ORNL

    2006-11-01T23:59:59.000Z

    A study was sponsored by FEMP in 2001 - 2002 to develop methods to compare life-cycle costs of federal energy conservation projects carried out through energy savings performance contracts (ESPCs) and projects that are directly funded by appropriations. The study described in this report follows up on the original work, taking advantage of new pricing data on equipment and on $500 million worth of Super ESPC projects awarded since the end of FY 2001. The methods developed to compare life-cycle costs of ESPCs and directly funded energy projects are based on the following tasks: (1) Verify the parity of equipment prices in ESPC vs. directly funded projects; (2) Develop a representative energy conservation project; (3) Determine representative cycle times for both ESPCs and appropriations-funded projects; (4) Model the representative energy project implemented through an ESPC and through appropriations funding; and (5) Calculate the life-cycle costs for each project.

  8. Supplement to the Phase IV final report and fourth update of the Energy Economic Data Base (EEDB) Program

    SciTech Connect (OSTI)

    Not Available

    1981-11-01T23:59:59.000Z

    The objective of the US DOE EEDB Program is to provide periodic updates of technical and cost (capital, fuel and operating and maintenance) information on nuclear and comparison electric power generating stations. This information is intended to be used by US DOE in evaluating and monitoring US civilian nuclear power programs, and to provide them with a consistent means of evaluating the nuclear option and proposed alternatives. In general, this supplement to the Fourth Update is an expansion of the data base to include intermediate capacity coal-fired comparison power generating stations. 17 refs., 23 tabs.

  9. Venture Capital Finance

    Broader source: Energy.gov [DOE]

    Plenary III: Project Finance and Investment Venture Capital Finance Brian Baynes, Partner, Flagship Ventures

  10. Networks, Information & Social Capital

    E-Print Network [OSTI]

    Aral, Sinan

    2008-01-26T23:59:59.000Z

    This paper investigates how information flows enable social networks to constitute social capital. By analyzing

  11. Systems Engineering Cost Estimation

    E-Print Network [OSTI]

    Bryson, Joanna J.

    on project, human capital impact. 7 How to estimate Cost? Difficult to know what we are building early on1 Systems Engineering Lecture 3 Cost Estimation Dr. Joanna Bryson Dr. Leon Watts University of Bath: Contrast approaches for estimating software project cost, and identify the main sources of cost

  12. Revised Date September 18, 2013 Capital Project Planning

    E-Print Network [OSTI]

    . Identify Funding Funding Source(s) 2. Cost Estimate Information (from preliminary estimate form): 3_- Project Name Cost Estimate Low Range High Range #12;Revised Date ­ January 25, 2013 Priority RankingRevised Date ­ September 18, 2013 Capital Project Planning Project Approval Form All capital

  13. Supercritical Pulverized Coal and Integrated Gasification Combined Cycle Partial CO2 Capture Cases - Updated Performance and Cost Effects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our InstagramStructure of All-Polymer.SupercomputingSuperconductivity at DawnCost

  14. Updated U.S. Geothermal Supply Curve

    SciTech Connect (OSTI)

    Augustine, C.; Young, K. R.; Anderson, A.

    2010-02-01T23:59:59.000Z

    This paper documents the approach used to update the U.S. geothermal supply curve. The analysis undertaken in this study estimates the supply of electricity generation potential from geothermal resources in the United States and the levelized cost of electricity (LCOE), capital costs, and operating and maintenance costs associated with developing these geothermal resources. Supply curves were developed for four categories of geothermal resources: identified hydrothermal (6.4 GWe), undiscovered hydrothermal (30.0 GWe), near-hydrothermal field enhanced geothermal systems (EGS) (7.0 GWe) and deep EGS (15,900 GWe). Two cases were considered: a base case and a target case. Supply curves were generated for each of the four geothermal resource categories for both cases. For both cases, hydrothermal resources dominate the lower cost range of the combined geothermal supply curve. The supply curves indicate that the reservoir performance improvements assumed in the target case could significantly lower EGS costs and greatly increase EGS deployment over the base case.

  15. Energy Economic Data Base (EEDB) Program. Phase III. Final report and third update

    SciTech Connect (OSTI)

    Crowley, J. H.; Allen, R. E.; Aklu, G. L.; Benedict, R. G.; Brown, P. E.; Hodson, J. S.; Kaminski, R. S.; Lee, N. H.; Marda, R. S.; Martin, R. J.; Molin, A. T.; Smith, M. H.; Sosnowicz, E. J.; Valorie, C. M.; Woodhull, A. S.; Ziegler, E. J.

    1981-07-01T23:59:59.000Z

    The objective of the USDOE EEDB Program is to provide periodic updates of technical and cost (capital, fuel and operating and maintenance) information of significance to the US Department of Energy. This information is intended to be used by USDOE in evauating and monitoring US civilian nuclear power programs, and to provide them with a consistent means of evaluating the nuclear option and proposed alternatives. The data tables, which make up the bulk of the report, are updated to January 1, 1980. The data in these tables and in the backup data file supercede the information presented in the Second Update (1979). Where required, new descriptive information is added in the text to supplement the data tables.

  16. CAPITAL ASSET MANAGEMENT (CAM) NEWS 2014 CAM has barcode scanners available for use when inventorying your equipment.

    E-Print Network [OSTI]

    records can be updated at any time via the Capital Asset Management section (CAMs) within EBS - FinanceCAPITAL ASSET MANAGEMENT (CAM) NEWS 2014 CAM has barcode scanners available for use when. You must have Role 6 ­ CAM Processor, in EBS - Finance, to edit/update asset records. For more

  17. CAMPUS PLANNING COMMITTEE PLANNING AND REVIEW PROCESS FOR MAJOR CAPITAL PROJECTS

    E-Print Network [OSTI]

    California at Santa Barbara, University of

    , efficient and cost effective manner; · Maximize the capital dollars available to UCSB from all sources with other campuses for scarce resources.); · Optimize the use of capital dollars; · Establish a clear; whose total cost is over $400,000. #12;B. 5-YEAR STATE-FUNDED MAJOR CAPITAL IMPROVEMENT PROGRAM

  18. WREF 2012: THE PAST AND FUTURE COST OF WIND ENERGY

    E-Print Network [OSTI]

    Wiser, Ryan

    2013-01-01T23:59:59.000Z

    lower capital costs in China (i.e. , $1,100/kW–$1,500/kW [capital costs from 2004 to 2009 was China. Specifically, the

  19. System design study to reduce capital and operating costs and bench-scale testing of a circulating-bed AFB advanced concept. Phase 1, Task 2: interim report on Task 1 results

    SciTech Connect (OSTI)

    Fraley, L.D.; Hsiao, K.H.; Lee, M.M.; Lin, Y.Y.; Sadhukhan, P.; Schlossman, M.; Schreiner, W.C.; Solbakken, A.

    1985-08-01T23:59:59.000Z

    The M.W. Kellogg Company has had under consideration for many years a combustor design involving a circulating fluid bed of ash, coal, lime/limestone sorbent, and calcium sulfate. In a previous study for the Department of Energy, M.W. Kellogg performed a design analysis for an atmospheric fluidized-bed combustor whose performance should significantly exceed conventional FBC operation performance, i.e., the Kellogg CFBC. The analysis conclusively showed that the Kellogg CFBC met or exceeded performance criteria for advanced atmospheric FBC's. This is superior to those FBC's currently in the market place. The objective of the study presented here was to reduce capital and operating costs of the Kellogg CFBC, configured into an industrial boiler system of 150,000 pounds per hour steaming capacity. This report presents the design optimization, detailed designs, and cost estimates required to compare CFBC with conventional AFB. The results show the Kellogg CFBC to be a very economical concept. Technically, the Kellogg CFBC can meet or exceed all of the design criteria established for an advanced AFBC. Its compact design resembles an FCC unit in structure and operation. By staged combustion, NO/sub x/ emissions are controlled by the reducing atmosphere and sulfur absorption enhanced in the improved kinetics of the H/sub 2/S-CaO reaction. The unique combustor/riser design keeps the boiler tubes from exposure to corrosive combustion gases, solving the erosion and corrosion problems existing in conventional bubbling-bed AFB. 7 refs., 28 figs., 17 tabs.

  20. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Applications: 2007 Update Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2007 Update This report estimates fuel cell system cost...

  1. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...

    Broader source: Energy.gov (indexed) [DOE]

    07 Update Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2007 Update This report estimates fuel cell system cost for systems...

  2. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    & Figures: Budget: Ł51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on SiteProject Fact Sheet Project Update: Project Brief: The concept of the new scheme is to redevelop Gardens project http://www.imperial.ac.uk/princesgardens/ Construction Project Team: Project Facts

  3. Energy Storage Systems 2010 Update Conference Presentations ...

    Broader source: Energy.gov (indexed) [DOE]

    chaired by NETL's Kim Nuhfer, are below. ESS 2010 Update Conference - Low Cost Energy Storage - Ted Wiley, Aquion.pdf Ess 2010 Update Conference - Solid State Li Metal Batteries...

  4. Cost Recovery Charge (CRC) Calculation Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cost Recovery Charge (CRC) Calculation Table Updated: March 20, 2015 FY 2016 February 2015 CRC Calculation Table (pdf) Final FY 2015 CRC Letter & Table (pdf) Note: The Cost...

  5. The Cost of Superconducting Magnets as a Function of Stored Energy and Design Magnetic Induction Times the Field Volume

    SciTech Connect (OSTI)

    Green, Mike; Green, M.A.; Strauss, B.P.

    2007-08-27T23:59:59.000Z

    By various theorems one can relate the capital cost of superconducting magnets to the magnetic energy stored within that magnet. This is particularly true for magnet where the cost is dominated by the structure needed to carry the magnetic forces. One can also relate the cost of the magnet to the product of the magnetic induction and the field volume. The relationship used to estimate the cost the magnet is a function of the type of magnet it is. This paper updates the cost functions given in two papers that were published in the early 1990 s. The costs (escalated to 2007 dollars) of large numbers of LTS magnets are plotted against stored energy and magnetic field time field volume. Escalated costs for magnets built since the early 1990 s are added to the plots.

  6. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006

    E-Print Network [OSTI]

    2008-01-01T23:59:59.000Z

    FERC Form 1, avoided cost data filed by utilities (in theby weighted-average capital cost data, provided elsewhere indata to compile capital cost data for a large number of U.S.

  7. Final Report What Will Adaptation Cost?

    E-Print Network [OSTI]

    ..................................................................................................................26 Task 3: Estimate Costs of Implementing Adaptation Strategies ....................................................................34 Task 2: Calculate the Capital and Maintenance CostsFinal Report What Will Adaptation Cost? An Economic Framework for Coastal Community Infrastructure

  8. Hydrogen refueling station costs in Shanghai

    E-Print Network [OSTI]

    Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

    2007-01-01T23:59:59.000Z

    systems in China, particularly for the cost of hydrogento the capital cost for equipment imported to China. 2.4.6.estate costs in Shanghai are among the highest in China and

  9. Reformulated gasoline: Costs and refinery impacts

    SciTech Connect (OSTI)

    Hadder, G.R.

    1994-02-01T23:59:59.000Z

    Studies of reformulated gasoline (RFG) costs and refinery impacts have been performed with the Oak Ridge National Laboratory Refinery Yield Model (ORNL-RYM), a linear program which has been updated to blend gasolines to satisfy emissions constraints defined by preliminary complex emissions models. Policy makers may use the reformulation cost knee (the point at which costs start to rise sharply for incremental emissions control) to set emissions reduction targets, giving due consideration to the differences between model representations and actual refining operations. ORNL-RYM estimates that the reformulation cost knee for the US East Coast (PADD I) is about 15.2 cents per gallon with a 30 percent reduction of volatile organic compounds (VOCs). The estimated cost knee for the US Gulf Coast (PADD III) is about 5.5 cents per gallon with a VOC reduction of 35 percent. Reid vapor pressure (RVP) reduction is the dominant VOC reduction mechanism. Even with anti-dumping constraints, conventional gasoline appears to be an important sink which permits RFG to be blended with lower aromatics and sulfur contents in PADD III. In addition to the potentially large sensitivity of RFG production to different emissions models, RFG production is sensitive to the non-exhaust VOC share assumption for a particular VOC model. ORNL-RYM has also been used to estimate the sensitivity of RFG production to the cost of capital; to the RVP requirements for conventional gasoline; and to the percentage of RFG produced in a refining region.

  10. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006

    E-Print Network [OSTI]

    2008-01-01T23:59:59.000Z

    on U.S. Wind Power Installation, Cost, and Performanceand Capital Costs Drive Wind Power Prices. . . . . 14Figure 18. Installed Wind Project Costs over Time Installed

  11. RETI Resource Valuation Methodology Cost of Generation Calculator

    E-Print Network [OSTI]

    ) · Cost of equity investment in capital · Cost of financing capital · Taxes, including investmentRETI Resource Valuation Methodology Cost of Generation Calculator The Cost of Generation Calculator determines the levelized cost of generating power over the life of the resource, and is an input

  12. Capital Access Program (Vermont)

    Broader source: Energy.gov [DOE]

    The Capital Access Program provides loan guarantees to small businesses seeking access to commercial credit. Premiums paid by the borrower and matched by Vermont Economic Development Authority fund...

  13. Health Capital and Finance

    E-Print Network [OSTI]

    Holland, Sara Bryant

    2010-01-01T23:59:59.000Z

    Capital and Finance by Sara Bryant Holland A dissertationCopyright 2010 by Sara Bryant Holland Abstract Healthand Finance by Sara Bryant Holland Doctor of Philosophy in

  14. Capital Reporting Company Quadrennial ...

    Office of Environmental Management (EM)

    3 05-27-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 QUADRENNIAL ENERGY REVIEW STAKEHOLDER MEETING 3 PETROLEUM TRANSMISSION, STORAGE AND DISTRIBUTION ISSUES...

  15. Capital Reporting Company Quadrennial ...

    Broader source: Energy.gov (indexed) [DOE]

    (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ENERGY POLICY AND SYSTEMS ANALYSIS QUADRENNIAL ENERGY REVIEW STAKEHOLDER...

  16. Capital Reporting Company Quadrennial ...

    Broader source: Energy.gov (indexed) [DOE]

    - DEPO www.CapitalReportingCompany.com 2014 1 UNITED STATE OF AMERICA DEPARTMENT OF ENERGY ---: : IN RE: : : QUADRENNIAL ENERGY REVIEW : : NEW...

  17. Road Map to Capitalization of Power Generating Facilities

    E-Print Network [OSTI]

    Kangas, M. Y. O.

    The capital requirement in Pulp and Paper Industry projects is enormous, a new pulp mill will cost about $1 Billion Dollars. The international competition is getting stronger as countries like Indonesia, Brazil, etc., build their own industry...

  18. Process Integration: Designing for Energy, Capital and Operability

    E-Print Network [OSTI]

    Linnhoff, B.

    Over the last five years, significant energy savings have been achieved by several international companies using the pinch concept for heat integration. New concepts are now being added to help the designer deal with capital cost minimization...

  19. Electronic copy available at: http://ssrn.com/abstract=2065816 Ultimate Ownership Structure and Bank Regulatory Capital Adjustment

    E-Print Network [OSTI]

    Boyer, Edmond

    their capital structure (debt/equity), firms in general and banks more specifically take control dilution costs into consideration, beyond the asymmetric information and transaction costs considered in prior research on capital and Bank Regulatory Capital Adjustment: Evidence from European Commercial Banks Laetitia Lepetita , Amine

  20. Falcon 9 Launch Vehicle NAFCOM Cost Estimates

    E-Print Network [OSTI]

    . ­ The updated estimates provided both Cost Plus Fee and Firm Fixed Price approaches and included two flight Updated Estimate Cost Plus Fee Cost Plus Fee Firm Fixed Price Cost Plus Fee Total Total Total Total in structure Interstage (composite material) was included in structures (aluminum lithium material) Interstage

  1. An Assessment of the Near-Term Costs of Hydrogen Refueling Stations and Station Components

    E-Print Network [OSTI]

    Weinert, Jonathan X.; Lipman, Timothy

    2006-01-01T23:59:59.000Z

    station. H2Gen’s estimates for capital costs are also lowerestimates and show high variability (26%-117% of capital costs).capital costs of about $250,000. Existing hydrogen station cost analyses tend to under-estimate

  2. Gas-Adsorption Processes - An Update

    E-Print Network [OSTI]

    Keller, G. E., II

    1984-01-01T23:59:59.000Z

    low capital costs per unit of feed processed. Given the importance of capital costs in overall process economics, vapor-liquid separations will usually be a first choice if the energy costs are tolerable. And in fact, systems of distillation... increased applications for recovery of organics from various process vent streams, storage-tank vents. and air streams from solvent-pointing and other operations involving vaporization of organics. Major-use areas such as gas dehydration, removal...

  3. Weighing the Costs and Benefits of Renewables Portfolio Standards: A Comparative Analysis of State-Level Policy Impact Projections

    E-Print Network [OSTI]

    Chen, Cliff; Wiser, Ryan; Bolinger, Mark

    2007-01-01T23:59:59.000Z

    Wind Power Capital Cost Assumptions (Base-Case Analysis).27. Wind Power Capital Cost Assumptions (Base-Case Analysis)wind cost assumptions employed in most of the RPS analyses

  4. Pennsylvania Capital Access Program (Pennsylvania)

    Broader source: Energy.gov [DOE]

    The Pennsylvania Capital Access Program provides loan guarantees for all businesses for the purchase of land, buildings, machinery, equipment and working capital through participating banks. The...

  5. Virginia Capital Access Program (Virginia)

    Broader source: Energy.gov [DOE]

    The Virginia Capital Access Program (CAP), in partnership with Virginia’s Small Business Financing Authority, provides access to capital for small businesses. Businesses must apply to...

  6. Capital Access Program (CAP) (Michigan)

    Broader source: Energy.gov [DOE]

    The Capital Access Program (CAP), utilizes public resources to generate private financing for small business in Michigan seeking access to capital. Funding from the Michigan Strategic Fund is...

  7. Cost Improvements, Returns to Scale, and Cost Inefficiencies for Real Estate Investment Trusts*

    E-Print Network [OSTI]

    Ahmad, Sajjad

    ) operating efficiencies. We estimate stochastic-frontier, panel-data models specifying a translog cost of the competitive advantage include economies of scale, lower capital costs, and superior sources of capital. Specifying a translog cost function and using 1995 to 2003 data, we estimate a stochastic-frontier panel

  8. Cost per-User as Key Factor in Project Prioritization: A Case Study of the San Francisco Bay Area

    E-Print Network [OSTI]

    Nuworsoo, Cornelius; Parks, Kamala; Deakin, Elizabeth

    2006-01-01T23:59:59.000Z

    The total estimated investment cost of network-related. ll0Vdistribution of capital investment costs and consequentlyThe total estimated investment cost of service-related

  9. Capital Pride 2015 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsNovember 13, 2014 Building America UpdateCX-001638:6BreakthroughAward |Capital

  10. Texas Capital Fund (Texas)

    Broader source: Energy.gov [DOE]

    The Texas Capital Fund is designed to promote growth in rural non-entitlement areas, generally defined as cities with less than 50,000 residents or counties with less than 200,000 residents....

  11. Capital Reporting Company Quadrennial ...

    Energy Savers [EERE]

    11-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 QUADRENNIAL ENERGY REVIEW PUBLIC MEETING 10: Infrastructure Constraints Monday, August 11, 2014 New Mexico State...

  12. Capital Reporting Company Quadrennial ...

    Office of Environmental Management (EM)

    07-21-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 QUADRENNIAL ENERGY REVIEW PUBLIC MEETING 6 MONDAY, JULY 21, 2014 HELD AT: RASHID AUDITORIUM-HILLMAN CENTER...

  13. Capital Reporting Company Quadrenntial ...

    Broader source: Energy.gov (indexed) [DOE]

    Quadrenntial Energy Review 04-21-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 NEW ENGLAND REGIONAL INFRASTRUCTURE CONSTRAINTS A Public Meeting on the Quadrennial...

  14. Flexible Capital Fund (Vermont)

    Broader source: Energy.gov [DOE]

    The Vermont Sustainable Jobs Fund's Flexible Capital Fund (the “Flex Fund”) is designed for companies in Vermont's rural areas that are smaller and work on a less-than global scale, offering a...

  15. CAPITAL PROGRAMMING GUIDE SUPPLEMENT TO

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Capital Plan CI Commercial Items COTS Commercial-off-the-shelf ESPC Energy Savings Performance Contract

  16. Cogeneration Project Analysis Update

    E-Print Network [OSTI]

    Robinson, A. M.; Garcia, L. N.

    diverse factors, such as, but no limited to: Fuel Considerations, Heat System Analysis, Electric Power Considerations, Key Technical Project Considerations, and Economic Analysis. INTRODUCTION The cogeneration systems being developed for industrial... power marched upward at a higher rate than fuel, capital equipment cost, and the prime interest rate. Typical Cogeneration System One system has been chosen as typical. This is one of the cogeneration systems which have proliferated over the past...

  17. Industrial Heat Pumps--Types and Costs 

    E-Print Network [OSTI]

    Chappell, R. N.; Bliem, C. J.; Mills, J. I.; Demuth, O. J.; Plaster, D. S.

    1985-01-01T23:59:59.000Z

    this categorization, the cost of recovering waste energy with heat pumps was examined. Examples were evaluated in which the cost of energy delivered was calculated based on estimates of capital cost, operating costs, and maintenance costs. Heat pumps from the various...

  18. Interim Update: Global Automotive Power Electronics R&D Relevant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interim Update: Global Automotive Power Electronics R&D Relevant To DOE 2015 and 2020 Cost Targets Interim Update: Global Automotive Power Electronics R&D Relevant To DOE 2015 and...

  19. University of Nebraska Lincoln Capital Project Planning Decision Flowchart

    E-Print Network [OSTI]

    Farritor, Shane

    originator and CPC provides general sizing, implications, cost estimate, etc. for project. Consistency of continuing? Yes No1 Project proposal with costs estimates provided to Chancellor and Senior AdministrativeUniversity of Nebraska ­ Lincoln Capital Project Planning Decision Flowchart 1. Program Concept 2

  20. Cost vs. performance ... Gwyn Griffiths email: gxg@noc.soton.ac.uk http://www.noc.soton.ac.uk/OED/gxg/

    E-Print Network [OSTI]

    Griffiths, Gwyn

    and safety-related costs are estimated to be 25% of the cost of the capital items. End of life disposal cost will be 5% of the capital cost. #12;Cost vs. performance ... Gwyn Griffiths email: gxg@noc.soton.ac.uk http://www.noc.soton.ac.uk/OED/gxg/ Cost & performance of Li-Po secondary batteries Component Capital cost Amortised cost per kWh Cost per

  1. CAPITAL PROGRAMMING GUIDE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for a disciplined capital programming process, as well as techniques for planning and budgeting, acquisition, and management and disposition of capital assets. CAPITAL PROGRAMMING...

  2. Survey Results and Analysis of the Cost and Efficiency of Various Operating Hydrogen Fueling Stations

    SciTech Connect (OSTI)

    Cornish, John

    2011-03-05T23:59:59.000Z

    Existing Hydrogen Fueling Stations were surveyed to determine capital and operational costs. Recommendations for cost reduction in future stations and for research were developed.

  3. The Cost of Helium Refrigerators and Coolers for SuperconductingDevices as a Function of Cooling at 4 K

    SciTech Connect (OSTI)

    Green, Michael A.

    2007-08-27T23:59:59.000Z

    This paper is an update of papers written in 1991 and in1997 by Rod Byrns and this author concerning estimating the cost ofrefrigeration for superconducting magnets and cavities. The actual costsof helium refrigerators and coolers (escalated to 2007 dollars) areplotted and compared to a correlation function. A correlation functionbetween cost and refrigeration at 4.5 K is given. The capital cost oflarger refrigerators (greater than 10 W at 4.5 K) is plotted as afunction of 4.5-K cooling. The cost of small coolers is plotted as afunction of refrigeration available at 4.2 K. A correlation function forestimating efficiency (percent of Carnot) of both types of refrigeratorsis also given.

  4. Washington Update

    Energy Savers [EERE]

    Text eere.energy.gov Federal Energy Management Program FederalUtility Partnership Working Group David McAndrew April 14, 2010 Providence RI Washington Update Federal Energy...

  5. The economics of alternative fuel cycles on sodium-cooled fast reactors and uncertainty and sensitivity analysis of cost estimates

    E-Print Network [OSTI]

    Russo, Genevieve V. (Genevieve Virgina)

    2010-01-01T23:59:59.000Z

    Previous work was done to create a baseline capital cost model for the SFR in which case studies were performed to identify ways to decrease the capital costs while maintaining safety and performance. This thesis expands ...

  6. CAPITAL ASSET DOCUMENT TRAINING

    E-Print Network [OSTI]

    KUALI CAPITAL ASSET MANAGEMENT DOCUMENT TRAINING Business and Financial Services, Property Management Presented by: Rachel Drenth #12;Sign On to the Training Site · CSU CAP (Campus Administration://padroni.is.colostate.edu:7778/portal/page/portal/CAPQA (THEN CHOOSE QUAL 2) · Non-production Applications: Training Kuali

  7. Critical Update - Renwable Guidance Update

    Broader source: Energy.gov (indexed) [DOE]

    Renewable Update FUPWG May 1, 2007 Chandra Shah, National Renewable Energy Laboratory 303-384-7557, chandrashah@nrel.gov Presentation Overview * Energy Policy Act of 2005 (EPACT...

  8. CaPS Application Form -2012 CAPITAL PROJECTS AND SPACE ALLOCATION COMMITTEE (CAPS)

    E-Print Network [OSTI]

    Toronto, University of

    No B TOTAL PROJECT COST ESTIMATE / OPERATING COSTS TOTAL PROJECT COST (TPC) $ Project Number: Requested project tendered at a cost exceeding the above pre-design estimate will not proceed unless the partyCaPS Application Form - 2012 CAPITAL PROJECTS AND SPACE ALLOCATION COMMITTEE (CAPS) APPLICATION

  9. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Applications: 2010 Update Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2010 Update This report is the fourth annual update of a...

  10. Costing Summaries for Selected Water Treatment

    E-Print Network [OSTI]

    · Engineering News-Record Construction Cost Index · Consumer Prices Index · Year Index = average of the monthly;Develop Costing Curves for : · Construction · Operation and Maintenance #12;Small Systems · Limited · Construction Costs · O&M Costs · General Design and Operational Information #12;Update The Costs for year 2000

  11. Capital and revenue expenditures

    E-Print Network [OSTI]

    Owens, Jack Bailey

    1948-01-01T23:59:59.000Z

    T and Charaoteristios of Various Expenditures ~ ~ 7 III. Bases for Expenditure Classifioationi ~ ~ ~ ~ ~ ~ ~ ~ r ~ ' ~ IV ~ Methods of kooountiag for Capital and Revenue Expenditure( ~ ~ I CkPITLL ERE RKVRRUm bXPLM)ITURkiS ISTRORUGTIOR kn ?ttonpt will be made... not tahe tho plass of asy asset or part of aa asset already onistiag Ln a business, but give tho already sainting fined asset ealues an a44ed physioal value whioh they did not previously possess ~ Additions rosoable original oost in that both...

  12. A Closer Evaluation of Capital Punishment: Viewing Executions through the Lens of Former Prison Employees

    E-Print Network [OSTI]

    Griffith, Athena Renee'

    2014-09-03T23:59:59.000Z

    : Authority and Compliance ............................... 15 C. Wright Mills Study: Power and Authority, Responsibility, and the Power Elite ....................................................................... 18 Capital Murder Inmates during the Pre... payers billions of dollars annually (Alexander 2012; Perkinson 2010; Reiman 2003), as well as the differences in costs for housing capital murder inmates living on death and those who are not living on death row (Johnson 2005; Vago 1997). In terms...

  13. Financing U.S. Renewable Energy Projects Through Public Capital Vehicles: Qualitative and Quantitative Benefits

    SciTech Connect (OSTI)

    Mendelsohn, M.; Feldman, D.

    2013-04-01T23:59:59.000Z

    This paper explores the possibility of financing renewable energy projects through raising capital in the public markets. It gives an overview of the size, structure, and benefits of public capital markets, as well as showing how renewable energy projects might take advantage of this source of new funds to lower the cost of electricity.

  14. CAMPUS PLANNING COMMITTEE PLANNING AND REVIEW PROCESS FOR MAJOR CAPITAL PROJECTS

    E-Print Network [OSTI]

    California at Santa Barbara, University of

    a detailed cost estimate. F. PROJECT PLANNING GUIDE (PPG): This document is required for all State fundedCAMPUS PLANNING COMMITTEE PLANNING AND REVIEW PROCESS FOR MAJOR CAPITAL PROJECTS (Revised June 2011) ___________________________________________________________________________________________ I. INTRODUCTION An effective major capital planning and review process will: Encourage appropriate

  15. Capital improvements can contribute greatly to an airport's future success, but

    E-Print Network [OSTI]

    Minnesota, University of

    description, cost estimate, federal programming sheets (available at www.mnaero.com), and start date. FederalCapital improvements can contribute greatly to an airport's future success, but they require a serious financial commit- ment by the airport owner. Planning ahead for capital improvements is critical

  16. Debt Capacity and Optimal Capital Structure for Privately-Financed Infrastructure Projects

    E-Print Network [OSTI]

    productivity, profitability, and private sector capital formation. He estimated, for example, that a 1 effective utilization of resources, when compared with the more flexible and cost conscious private sectorDebt Capacity and Optimal Capital Structure for Privately-Financed Infrastructure Projects

  17. Florida Venture Capital Program (Florida)

    Broader source: Energy.gov [DOE]

    The Florida Venture Capital Program provides equity investments and convertible debt instruments to emerging Florida companies and companies locating in Florida with long-term growth potential. ...

  18. Throughput-cost analysis of optical flow switching

    E-Print Network [OSTI]

    Chan, Vincent W. S.

    In this paper, we employ a cost model embodying major sources of capital expenditure (CapEx) to compare the throughput-cost tradeoff offered by optical flow switching to that of more traditional optical network architectures.

  19. Human Capital Management Accountability Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-08-01T23:59:59.000Z

    The Order establishes requirements, roles and responsibilities for the Human Capital Management Accountability Program (HCMAP) for human resources programs and personnel and ensures that human capital activities are regulatory and procedurally compliant with Federal statutes and Departmental policies. Does not cancel other directives.

  20. CAPITAL PLAN UPDATE Fiscal Year 2013 to 2017

    E-Print Network [OSTI]

    Massachusetts at Lowell, University of

    academic and research spaces, increase residential capacity, renew our existing buildings, develop new reduce our backlog of critical maintenance and our energy consumption while we create additional modern enrollment and research growth trends as well as projected future growth in academic programs, sponsored

  1. Table 1. Updated estimates of power plant capital and operating...

    U.S. Energy Information Administration (EIA) Indexed Site

    CT",85,10850,,973,7.34,15.45,"Y" "Advanced CT",210,9750,,676,7.04,10.37,"Y" "Fuel Cells",10,9500,,7108,0,43,"Y" " Uranium" "Dual Unit Nuclear",2234,"N...

  2. West Virginia Venture Capital (West Virginia)

    Broader source: Energy.gov [DOE]

    The West Virginia Venture Capital provides investment funds to eligible businesses stimulating economic growth and providing or retaining jobs within the state through qualified venture capital...

  3. Akeida Capital Management | Open Energy Information

    Open Energy Info (EERE)

    Akeida Capital Management Jump to: navigation, search Name: Akeida Capital Management Place: New York, New York Zip: 10036 Region: Northeast - NY NJ CT PA Area Product: Financing...

  4. Sandia National Laboratories: most promising strategies for cost...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    promising strategies for cost-efficient biorefinery operations JBEI Updates Techno-Economic Modeling Tools for Biofuels On September 18, 2013, in Biofuels, Biomass, Computational...

  5. Mass Production Cost Estimation of Direct Hydrogen PEM Fuel Cell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen PEM Fuel Cell Systems for Transportation Applications: 2012 Update Mass Production Cost Estimation of Direct Hydrogen PEM Fuel Cell Systems for Transportation...

  6. Changing the Climate: Looking Towards a More Cost Effective,...

    Broader source: Energy.gov (indexed) [DOE]

    updated "National Action Plan Vision for 2025: A Framework for Change." Changing the Climate: Looking Towards a More Cost Effective, Energy Efficient Future, November 18, 2008...

  7. Mass Production Cost Estimation of Direct Hydrogen PEM Fuel Cell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mass Production Cost Estimation of Direct H 2 PEM Fuel Cell Systems for Transportation Applications: 2012 Update October 18, 2012 Prepared By: Brian D. James Andrew B. Spisak...

  8. The Intangible Costs and Benefits of Computer Investments: Evidence from the Financial Markets

    E-Print Network [OSTI]

    The Intangible Costs and Benefits of Computer Investments: Evidence from the Financial Markets Erik for computer capital in firm-level productivity studies. Costly investments in software, training the intangible costs and benefits of computer capital and we present several new empirical results based

  9. Computerized operating cost model for industrial steam generation

    SciTech Connect (OSTI)

    Powers, T.D.

    1983-02-01T23:59:59.000Z

    Pending EPA regulations, establishing revised emission levels for industrial boilers are perceived to have an effect on the relative costs of steam production technologies. To aid in the comparison of competitive boiler technologies, the Steam Cost Code was developed which provides levelized steam costs reflecting the effects of a number of key steam cost parameters. The Steam Cost Code is a user interactive FORTRAN program designed to operate on a VAX computer system. The program requires the user to input a number of variables describing the design characteristics, capital costs, and operating conditions for a specific boiler system. Part of the input to the Steam Cost Code is the capital cost of the steam production system. The capital cost is obtained from a program called INDCEPT, developed by Oak Ridge National Laboratory under Department of Energy, Morgantown Energy Technology Center sponsorship.

  10. Pinnacle West Capital Corporation

    E-Print Network [OSTI]

    Identification of technical barriers Identification of market opportunities #12;Approach Safety & Economics new technology Solar reforming of natural gas Low cost electrolysis opportunities Identify hydrogen storage models Chemical by-product management model Pilot Solar reforming of natural gas model #12

  11. Florida Capital Access Program (Florida)

    Broader source: Energy.gov [DOE]

    The Florida Capital Access Program, run by the Florida Department of Economic Development, is a loan portfolio insurance program enabling lenders to make loans to credit-worthy small businesses. ...

  12. Venture Capital Program (North Dakota)

    Broader source: Energy.gov [DOE]

    The Venture Capital Program, provided by the ND Department of Commerce, is an innovative financial program that provides flexible financing through debt and equity investments for new or expanding...

  13. Capital Investment Tax Credit (Florida)

    Broader source: Energy.gov [DOE]

    The Capital Investment Tax Credit is an annual credit, provided for up to twenty years, against the corporate income tax. Eligible projects are those in designated high-impact portions of the...

  14. Nonlinear Capital Taxation Without Commitment

    E-Print Network [OSTI]

    Werning, Ivan

    We study efficient non-linear taxation of labour and capital in a dynamic Mirrleesian model incorporating political economy constraints. Policies are chosen sequentially over time, without commitment. Our main result is ...

  15. 2014 State Capital Request Board of Regents

    E-Print Network [OSTI]

    Weiblen, George D

    on FY 2015 capital budget Financial Summary Request dollars in thousands Location Project Total State U

  16. ADJUSTMENT COSTS, LEARNING-BY-DOING, AND TECHNOLOGY ADOPTION UNDER UNCERTAINTY

    E-Print Network [OSTI]

    Pavlova, Anna

    2003-01-27T23:59:59.000Z

    We consider a variety of vintage capital models of a firm's choice of technology under uncertainty in the presence of adjustment costs and technology-specific learning. ...

  17. 11.1 REQUESTS FOR REMODELING OR PROJECT/CONSTRUCTION SERVICES Any plans for building remodeling must be approved by the Provost before Capital Planning and

    E-Print Network [OSTI]

    for preliminary approval and permission to obtain a conceptual cost estimate from Capital Planning and Construction. Once the cost estimate is completed, the entire request will be sent to the Space Committee must be approved by the Provost before Capital Planning and Construction or Facilities Management can

  18. EPA Diesel Update

    Broader source: Energy.gov (indexed) [DOE]

    EPA Diesel Update 2005 DEER Conference Bill Charmley EPAOffice of Transportation and Air Quality August 22, 2005 2 Overview * Implementation update on mobile source diesel...

  19. Startup Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    This chapter discusses startup costs for construction and environmental projects, and estimating guidance for startup costs.

  20. AREA COST FACTOR INDEXES PAX NEWSLETTER NO. 3.2.1

    E-Print Network [OSTI]

    US Army Corps of Engineers

    ). The ACF index is the combination factors of local construction costs of labor, material, and equipmentAREA COST FACTOR INDEXES PAX NEWSLETTER NO. 3.2.1 15 March 2002 1. The attached updated area cost manual TM 5-800-4, Programming Cost Estimates for Military Construction, dated May 1994. The updated ACF

  1. ESnet Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract ManagementDiscoveringESnet Update Winter 2008 Joint Techs Workshop

  2. 2009 Cost Estimates of Establishing and

    E-Print Network [OSTI]

    Collins, Gary S.

    2009 Cost Estimates of Establishing and Producing Gala Apples in Washington WASHINGTON STATE include estimating 1) the costs of the equipment, materials, supplies, and labor required to establish for any particular orchard operation due to case-specific: · Capital, labor, and natural resources · Crop

  3. 2013 Cost Estimation of Establishing a

    E-Print Network [OSTI]

    Collins, Gary S.

    1 2013 Cost Estimation of Establishing a Cider Apple Orchard in Western Washington W A S H I N G factors: · Capital, labor, and natural resources · Crop yield · Cultural practices · Input prices Cost estimations in this enterprise budget also vary depending on the budget's intended use. To avoid

  4. 2011 Strategic Capital Discussions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del(ANL-IN-03-032) -Less isNFebruary 2004August 2011 Wed,2011 Cost of Wind20111and2011

  5. Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 1 (Edinburg) - North Branch / East Main - Final

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    Initial construction costs and net annual changes in operating and maintenance expenses are identified for a single-component capital renovation project proposed by Hidalgo County Irrigation District No. 1 to the Bureau of Reclamation and North...

  6. Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) - Relining Lateral A - Final

    E-Print Network [OSTI]

    Popp, Michael; Robinson, John; Sturdivant, Allen; Lacewell, Ronald; Rister, Edward

    Initial construction costs and net annual changes in operating and maintenance expenses are identified for a single-component capital renovation project proposed by Hidalgo County Irrigation District No. 2, (a.k.a. San Juan) to the North American...

  7. Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 1 (Edinburg) - Curry Main - Final

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    Initial construction costs and net annual changes in operating and maintenance expenses are identified for a single-component capital renovation project proposed by Hidalgo County Irrigation District No. 1 to the Bureau of Reclamation and North...

  8. Corruption, Firm Governance, and the Cost of Capital

    E-Print Network [OSTI]

    Garmaise, Mark J; Liu, Jun

    2005-01-01T23:59:59.000Z

    David F. Larcker, “Corporate governance, chief ex- ecutiveof the world. Ine?ective corporate governance combined withof the world. Weak corporate governance therefore destroys ?

  9. Some Observations on Energy Efficiency and Capital Cost 

    E-Print Network [OSTI]

    Kenney, W. F.

    1982-01-01T23:59:59.000Z

    an integrated petrochemical cOlpany might see lower overall investment inside thei fence by the installation of more energy effic ent processes. I I CONSIDER COGENERATION I One obvious fallout from the global stUdi~ls is to consider industrial...

  10. Updated 11/1/2012 GEORGIA INSTITUTE OF TECHNOLOGY

    E-Print Network [OSTI]

    Li, Mo

    Updated 11/1/2012 GEORGIA INSTITUTE OF TECHNOLOGY OFFICE OF FINANCIAL SERVICES ADMINSTRATION Cash/Investment Management Debt Management Georgia Tech Facilities, Inc. Georgia Advanced Technology Ventures, Inc. Project Accounting Cost Accounting Rate Studies Negotiations Salary, Planning

  11. Capital Cooking: Order (2014-CE-23008)

    Broader source: Energy.gov [DOE]

    DOE ordered Capital Cooking Equipment, Inc. to pay a $8,000 civil penalty after finding Capital Cooking had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  12. Fixed Capital Investment Tax Credit (Connecticut)

    Broader source: Energy.gov [DOE]

    The Fixed Capital Investment Tax Credit allows a tax credit of 5% of the amount paid for any new fixed capital investment. Companies with fewer than 800 full-time employees may take a tax credit...

  13. Essays on information technology and intangible capital

    E-Print Network [OSTI]

    Saunders, Adam

    2011-01-01T23:59:59.000Z

    This thesis consists of three essays related to information technology and intangible capital. The first essay, "Valuing IT-Related Intangible Capital," examines the value of intangible assets in the firm. Using a panel ...

  14. Public Capital, Growth and Welfare

    E-Print Network [OSTI]

    (t) + I(t) (0,1): depreciation rate. K(t+1) = (1 - )K(t) + I(t) (0,1): efficiency/governance services Private capital Rate of time preference Consumption saving decisions Investment in physical and sanitation--increase in enrolment rates (especially for girls, rural areas). 2. Electricity

  15. Assessment of light water reactor power plant cost and ultra-acceleration depreciation financing

    E-Print Network [OSTI]

    El-Magboub, Sadek Abdulhafid.

    Although in many regions of the U.S. the least expensive electricity is generated from light-water reactor (LWR) plants, the fixed (capital plus operation and maintenance) cost has increased to the level where the cost ...

  16. Energy Price Indices and Discount Factors for Life-Cycle Cost...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Energy Price Indices and Discount Factors for Life-Cycle Cost Analysis - 2012 Report provides tables of present-value factors for use in the life-cycle cost analysis of capital...

  17. Strategic Use of Human Capital | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Human Capital Strategic Use of Human Capital A report on how the DOE uses and plans to reform their use of human capital. Strategic Use of Human Capital More Documents &...

  18. MONITORED GEOLOGIC REPOSITORY LIFE CYCLE COST ESTIMATE ASSUMPTIONS DOCUMENT

    SciTech Connect (OSTI)

    R.E. Sweeney

    2001-02-08T23:59:59.000Z

    The purpose of this assumptions document is to provide general scope, strategy, technical basis, schedule and cost assumptions for the Monitored Geologic Repository (MGR) life cycle cost (LCC) estimate and schedule update incorporating information from the Viability Assessment (VA) , License Application Design Selection (LADS), 1999 Update to the Total System Life Cycle Cost (TSLCC) estimate and from other related and updated information. This document is intended to generally follow the assumptions outlined in the previous MGR cost estimates and as further prescribed by DOE guidance.

  19. Making Human Capital the Creative Core of

    E-Print Network [OSTI]

    Keinan, Alon

    . They must confront economic uncertainty, environmentalrisk,socialchangeandothervolatileforces.Toexecute on Human Capital Financial capital has lost some of its primacy as the catalyst of growth. Human capital that is constantly learning, adjusting and adapting to new technology," says Chris Collins, director of the Center

  20. A Study of the Key Variables Affecting Bus Replacement Age Decisions and1 Total Costs2

    E-Print Network [OSTI]

    Bertini, Robert L.

    A Study of the Key Variables Affecting Bus Replacement Age Decisions and1 Total Costs2 3 Jesse operational3 and maintenance (O&M) per-mile costs increase as buses age. From a purely economic4 perspective, there is a cost tradeoff between the lower O&M costs of newer fleets and their5 higher initial capital costs

  1. Air, High Speed Rail, or Highway: A Cost Comparison in the California Corridor

    E-Print Network [OSTI]

    Levinson, David M.

    these reduced social costs offset rail's high capital and operating costs. The development of cost estimates, any of these three modes. In this study we include estimates of four types of external, social costs design characteristics observed in the California corridor. We estimate rail costs with models adapted

  2. LEAD at Unidata Status Update, April 2009

    E-Print Network [OSTI]

    LEAD at Unidata Status Update, April 2009 Mohan Ramamurthy The LEAD project is currently in the no-cost extension period and nearing the end of its period of performance as an NSF Large ITR award. LEAD has and networking to huge data sets, human decision making and complex virtual organizations ­ LEAD functionality

  3. LEAD at Unidata Status Update, October 2009

    E-Print Network [OSTI]

    LEAD at Unidata Status Update, October 2009 Mohan Ramamurthy The official period of performance for the LEAD project ended on 30 September 2009 after a one-year the no-cost extension period. The six year ITR computing and networking to huge data sets, human decision making and complex virtual organizations ­ LEAD

  4. AREA COST FACTOR INDEXES PAX NEWSLETTER NO. 3.2.1

    E-Print Network [OSTI]

    US Army Corps of Engineers

    in the continental US). The ACF index is the combination factors of the local construction costs of labor, materialAREA COST FACTOR INDEXES PAX NEWSLETTER NO. 3.2.1 01 May 1998 1. The following is a list of updated 5-800-4, Programming Cost Estimates for Military Construction, dated May 1994. The updated ACF

  5. ANALYSIS OF THE PERFORMANCE AND COST EFFECTIVENESS OF NINE SMALL WIND ENERGY CONVERSION SYSTEMS FUNDED BY THE DOE SMALL GRANTS PROGRAM

    E-Print Network [OSTI]

    Kay, J.

    2009-01-01T23:59:59.000Z

    scale wind energy commer- is high capital costs per unit ofPERFORMANCE AND COST EFFECTIVENESS OF NINE SMALL WIND ENERGYPERFORMANCE AND COST EFFECTIVENESS OF NINE SMALL WIND ENERGY

  6. Capital Development University of Utah

    E-Print Network [OSTI]

    van den Berg, Jur

    · Estimated Cost: $50,000,000 · GSF: N/A · Impacts: N/A · Three substations · Three voltages · Old & Obsolete · Limited redundancy · Little monitoring & control #12;Orthopedics Phase II Expansion Cost: $9,580,000 25. #12;S.J. Quinney College of Law Estimated Cost: $60,500,000 155,825 New GSF Demo GSF: TBD #12;S

  7. Plans, Updates, Regulatory Documents

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stewardship Environmental Protection Obeying Environmental Laws Individual Permit Documents Individual Permit: Plans, Updates, Regulatory Documents1335769200000Plans...

  8. PSRP SC Updated

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Laboratory). 25.0 Light Source Improvements Funds provide an immediate infusion of resources for capital equipment and instrumentation to best realize the...

  9. SUBJECT: Increase in Equipment Capitalization Threshold to $5,000 As of July 1, 2011 the Florida Board of Governors approved BOG Regulation 9.001, 9.002, 9.003

    E-Print Network [OSTI]

    Fernandez, Eduardo

    resources greater than $250 all have been capitalized. As of July 1, 2011 the threshold is increased from personal property items with a cost of greater $5,000 and library resources with a cost greater than $250SUBJECT: Increase in Equipment Capitalization Threshold to $5,000 As of July 1, 2011 the Florida

  10. Energy Efficiency Improvement and Cost Saving Opportunities for the Dairy Processing Industry

    E-Print Network [OSTI]

    Brush, Adrian

    2012-01-01T23:59:59.000Z

    technologies/water_efficiency.cfm. High pressure low volumefor Compressed Air Efficiency. E-Source Tech Update.Refrigeration Plant Efficiently -- A Cost Saving Guide for

  11. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mass Production Cost Estimation for Direct H 2 PEM Fuel Cell Systems for Automotive Applications: 2007 Update February 29, 2008 Final Version Brian D. James Jeffrey A. Kalinoski...

  12. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mass Production Cost Estimation for Direct H 2 PEM Fuel Cell Systems for Automotive Applications: 2010 Update September 30, 2010 Prepared by: Brian D. James, Jeffrey A. Kalinoski...

  13. mMass Production Cost Estimation for Direct H2 PEM Fuel Cell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mass Production Cost Estimation for Direct H 2 PEM Fuel Cell Systems for Automotive Applications: 2009 Update January 1, 2010 Prepared by: Brian D. James, Jeffrey A. Kalinoski &...

  14. Yellowstone Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit withTianlinPapers HomeXuanen Shiziguan Hydropower CoYasunaga Wire SawCapital Jump

  15. Osmosis Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRoseConcernsCompany OilInformationPre-Tax ChargeOsmosis Capital Jump

  16. Capital Connections | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovation inOpen EnergyCallawayCapara Energia S A Jump to:Capital

  17. Greenview Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetec AG ContractingGreenOrder JumpIowa:Greenport, NewGCA JumpGreenview Capital

  18. BEV Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia: EnergyAvignon, France: Energy Resources JumpPáginas deBARCBEV Capital

  19. Arborview Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcatAntrim County,Delhi (NCT),Arborview Capital Jump to: navigation,

  20. Cascadia Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:Power LPInformation 8thCalwindCaribbeanCaruthers,Cascadia Capital

  1. Renewable Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries Pvt Ltd Jump to: navigation, searchRayreviewAl.,RenGen Energy LtdOpenCapital Place:

  2. Commons Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model, clickInformationNew York:GovernorCommons Capital Jump to: navigation, search

  3. Heliostat cost reduction study.

    SciTech Connect (OSTI)

    Jones, Scott A.; Lumia, Ronald. (University of New Mexico, Albuquerque, NM); Davenport, Roger (Science Applications International Corporation, San Diego, CA); Thomas, Robert C. (Advanced Thermal Systems, Centennial, CO); Gorman, David (Advanced Thermal Systems, Larkspur, CO); Kolb, Gregory J.; Donnelly, Matthew W.

    2007-06-01T23:59:59.000Z

    Power towers are capable of producing solar-generated electricity and hydrogen on a large scale. Heliostats are the most important cost element of a solar power tower plant. Since they constitute {approx} 50% of the capital cost of the plant it is important to reduce heliostat cost as much as possible to improve the economic performance of power towers. In this study we evaluate current heliostat technology and estimate a price of $126/m{sup 2} given year-2006 materials and labor costs for a deployment of {approx}600 MW of power towers per year. This 2006 price yields electricity at $0.067/kWh and hydrogen at $3.20/kg. We propose research and development that should ultimately lead to a price as low as $90/m{sup 2}, which equates to $0.056/kWh and $2.75/kg H{sup 2}. Approximately 30 heliostat and manufacturing experts from the United States, Europe, and Australia contributed to the content of this report during two separate workshops conducted at the National Solar Thermal Test Facility.

  4. The Ohio Capital Access Program (OCAP) (Ohio)

    Broader source: Energy.gov [DOE]

    The Ohio Capital Access Program (OCAP) encourages state depository financial institutions to make loans to for-profit or nonprofit small businesses that are having difficulty obtaining business...

  5. Capital Cooking: Proposed Penalty (2014-CE-23008)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Capital Cooking Equipment, Inc. failed to certify cooking products as compliant with the applicable energy conservation standards.

  6. Capital Investment Incentive (Nova Scotia, Canada)

    Broader source: Energy.gov [DOE]

    The Capital Investment Incentive (CII) is part of the Productivity Investment Program as outlined in the economic growth plan for Nova Scotia, jobsHere.

  7. HTGR Cost Model Users' Manual

    SciTech Connect (OSTI)

    A.M. Gandrik

    2012-01-01T23:59:59.000Z

    The High Temperature Gas-Cooler Reactor (HTGR) Cost Model was developed at the Idaho National Laboratory for the Next Generation Nuclear Plant Project. The HTGR Cost Model calculates an estimate of the capital costs, annual operating and maintenance costs, and decommissioning costs for a high-temperature gas-cooled reactor. The user can generate these costs for multiple reactor outlet temperatures; with and without power cycles, including either a Brayton or Rankine cycle; for the demonstration plant, first of a kind, or nth of a kind project phases; for a single or four-pack configuration; and for a reactor size of 350 or 600 MWt. This users manual contains the mathematical models and operating instructions for the HTGR Cost Model. Instructions, screenshots, and examples are provided to guide the user through the HTGR Cost Model. This model was design for users who are familiar with the HTGR design and Excel. Modification of the HTGR Cost Model should only be performed by users familiar with Excel and Visual Basic.

  8. *Excludes capital investment for P&R facility EFFECTS OF MAP-21 ON SEAMLESS TRANSIT FROM

    E-Print Network [OSTI]

    *Excludes capital investment for P&R facility EFFECTS OF MAP-21 ON SEAMLESS TRANSIT FROM FORT BEND is not available for residents making the commute from FBC to Downtown Houston. · Researchers estimate latent demand for 1,700+ P&R one-way passenger trips per day. SEAMLESS TRANSIT COST · Federal funds may

  9. Handles Revisited: Optimising Performance and Memory Costs in a Real-Time Collector

    E-Print Network [OSTI]

    Kent, University of

    Handles Revisited: Optimising Performance and Memory Costs in a Real-Time Collector Tomas Kalibera garbage collectors must update all references to ob- jects they move. Updating is a lengthy operation references have been updated which, in a real-time collector, must be done incrementally. One solution

  10. Estimating the manufacturing cost of purely organic solar cells Joseph Kalowekamo 1

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    to a levelized cost of electricity (LEC) of between 49˘ and 85˘/kWh. In order to achieve a more competitive COE that into a levelized electricity cost (LEC). We find that there is a great deal of uncertainty about the capital costs., Estimating the manufacturing cost of purely organic solar cells, Sol. Energy (2009), doi:10.1016/j

  11. Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) - Rehabilitation of Alamo Main Canal - Final

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.

    Initial construction costs and net annual changes in operating and maintenance expenses are identified for a two-component capital renovation project proposed by Hidalgo County Irrigation District No. 2, to the U. S. Bureau of Reclamation (USBR...

  12. Cost-E ective Flow Table Designs for High-Speed Routers: Architecture and Performance Evaluation

    E-Print Network [OSTI]

    Xu, Jun "Jim"

    Cost-E#11;ective Flow Table Designs for High-Speed Routers: Architecture and Performance Evaluation State variables Service Parameters update read read Incoming packet action Search Y N Lookup Initialize to be performed (e.g., which output port to route the packet) on the packet and the new values the state variables

  13. Estimated Costs for Production, Storage and Transportation of Switchgrass

    E-Print Network [OSTI]

    Duffy, Michael D.

    Estimated Costs for Production, Storage and Transportation of Switchgrass File A1-22 February 2008 updates earlier production cost estimates for switchgrass. The earlier estimations were com- pleted University (ISU) Extension publication Costs of Producing Switchgrass for Biomass in South- ern Iowa, PM 1866

  14. Clean Coal Technology Programs: Program Update 2009

    SciTech Connect (OSTI)

    None

    2009-10-01T23:59:59.000Z

    The purpose of the Clean Coal Technology Programs: Program Update 2009 is to provide an updated status of the U.S. Department of Energy (DOE) commercial-scale demonstrations of clean coal technologies (CCT). These demonstrations have been performed under the Clean Coal Technology Demonstration Program (CCTDP), the Power Plant Improvement Initiative (PPII), and the Clean Coal Power Initiative (CCPI). Program Update 2009 provides: (1) a discussion of the role of clean coal technology demonstrations in improving the nation’s energy security and reliability, while protecting the environment using the nation’s most abundant energy resource—coal; (2) a summary of the funding and costs of the demonstrations; and (3) an overview of the technologies being demonstrated, along with fact sheets for projects that are active, recently completed, or recently discontinued.

  15. Clean coal technology programs: program update 2006

    SciTech Connect (OSTI)

    NONE

    2006-09-15T23:59:59.000Z

    The purpose of the Clean Coal Technology Programs: Program Update 2006 is to provide an updated status of the DOE commercial-scale demonstrations of clean coal technologies (CCTs). These demonstrations are performed under the Clean Coal Technology Demonstration Program (CCTDP), the Power Plant Improvement Initiative (PPII) and the Clean Coal Power Initiative (CCPI). Program Update 2006 provides 1) a discussion of the role of clean coal technology demonstrations in improving the nation's energy security and reliability, while protecting the environment using the nation's most abundant energy resource - coal; 2) a summary of the funding and costs of the demonstrations; and 3) an overview of the technologies being demonstrated, with fact sheets for demonstration projects that are active, recently completed, withdrawn or ended, including status as of June 30 2006. 4 apps.

  16. Corporate Venture Capital (CVC) Seeking Innovation and

    E-Print Network [OSTI]

    , Technology Innovation Program, National Institute of Standards and Technology #12;Corporate Venture Capital, Deputy Director Technology Innovation Program Marc G. Stanley, Director #12;ii Acknowledgments T his policymakers in the role of corporate venture capital (CVC) in technology innovation. The research included

  17. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2008 Update Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for...

  18. Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for Transportation Applications: 2013 Update Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems...

  19. Power Purchase Agreements Update

    Broader source: Energy.gov [DOE]

    Presentation covers an update on power purchase agreements and is given at the Spring 2011 Federal Utility Partnership Working Group (FUPWG) meeting.

  20. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electricity Monthly Update Explained Highlights The Highlights page features in the center a short article about a major event or an informative topic. The left column contains...

  1. Navy Technology Evaluation Update

    Broader source: Energy.gov [DOE]

    Presentation covers the Navy Technology Evaluation update at the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

  2. Trade and Capital Flows: A Financial Frictions Perspective

    E-Print Network [OSTI]

    Antrŕs, Pol

    The classical Heckscher?Ohlin?Mundell paradigm states that trade and capital mobility are substitutes in the sense that trade integration reduces the incentives for capital to flow to capital?scarce countries. In this paper ...

  3. TINSSL Update | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    an electronic newsletter designed to help TINSSL members keep up to date on the latest SSL news and events. TINSSL Update, May 2014 TINSSL Update, March 2014 TINSSL Update,...

  4. The Cost of Debt Jules H. van Binsbergen

    E-Print Network [OSTI]

    § This version: January 2008 Abstract We estimate firm-specific cost of corporate debt functions for thousands of debt benefit curves. By integrating the area between the benefit and cost functions we estimate in capital structure policies by studying the signs of estimated slope coefficients for factors such as firm

  5. Program & Project Management For The Acquisition Of Capital Assets...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program & Project Management For The Acquisition Of Capital Assets Program & Project Management For The Acquisition Of Capital Assets Project Assessment and Reporting...

  6. Electric Turbo Compounding Technology Update

    Broader source: Energy.gov (indexed) [DOE]

    Turbo Compounding Technology Update Electric Turbo Compounding Technology Update 15 August, 2007 Carl Vuk 15 August, 2007 Carl Vuk Electric Turbo Compounding Highlights Electric...

  7. FUPWG: Washington Update

    Broader source: Energy.gov (indexed) [DOE]

    May 7, 2014 Timothy D. Unruh PhD, PE, CEM Program Manager DOE FEMP 2 Agenda Mission Presidential Memorandum of 12211 White House Capital Solar Challenge eProject...

  8. Breckinridge Project, initial effort. Report IX. Operating cost estimate

    SciTech Connect (OSTI)

    none,

    1982-01-01T23:59:59.000Z

    Operating costs are normally broken into three major categories: variable costs including raw materials, annual catalyst and chemicals, and utilities; semi-variable costs including labor and labor related cost; and fixed or capital related charges. The raw materials and utilities costs are proportional to production; however, a small component of utilities cost is independent of production. The catalyst and chemicals costs are also normally proportional to production. Semi-variable costs include direct labor, maintenance labor, labor supervision, contract maintenance, maintenance materials, payroll overheads, operation supplies, and general overhead and administration. Fixed costs include local taxes, insurance and the time value of the capital investment. The latter charge often includes the investor's anticipated return on investment. In determining operating costs for financial analysis, return on investment (ROI) and depreciation are not treated as cash operating costs. These costs are developed in the financial analysis; the annual operating cost determined here omits ROI and depreciation. Project Annual Operating Costs are summarized in Table 1. Detailed supporting information for the cost elements listed below is included in the following sections: Electrical, catalyst and chemicals, and salaries and wages.

  9. Updated U.S. Geothermal Supply Characterization

    SciTech Connect (OSTI)

    Petty, S.; Porro, G.

    2007-03-01T23:59:59.000Z

    This paper documents the approach taken to characterize and represent an updated assessment of U.S. geothermal supply for use in forecasting the penetration of geothermal electrical generation in the National Energy Modeling System (NEMS). This work is motivated by several factors: The supply characterization used as the basis of several recent U.S. Department of Energy (DOE) forecasts of geothermal capacity is outdated; additional geothermal resource assessments have been published; and a new costing tool that incorporates current technology, engineering practices, and associated costs has been released.

  10. Microsoft PowerPoint - Crouther.HumanCapitalInitiatives.042909

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_Cost Estimating Panel Microsoft PowerPoint -ofUpdates Presented to

  11. Realistic costs of carbon capture

    SciTech Connect (OSTI)

    Al Juaied, Mohammed (Harvard Univ., Cambridge, MA (US). Belfer Center for Science and International Affiaris); Whitmore, Adam (Hydrogen Energy International Ltd., Weybridge (GB))

    2009-07-01T23:59:59.000Z

    There is a growing interest in carbon capture and storage (CCS) as a means of reducing carbon dioxide (CO2) emissions. However there are substantial uncertainties about the costs of CCS. Costs for pre-combustion capture with compression (i.e. excluding costs of transport and storage and any revenue from EOR associated with storage) are examined in this discussion paper for First-of-a-Kind (FOAK) plant and for more mature technologies, or Nth-of-a-Kind plant (NOAK). For FOAK plant using solid fuels the levelised cost of electricity on a 2008 basis is approximately 10 cents/kWh higher with capture than for conventional plants (with a range of 8-12 cents/kWh). Costs of abatement are found typically to be approximately US$150/tCO2 avoided (with a range of US$120-180/tCO2 avoided). For NOAK plants the additional cost of electricity with capture is approximately 2-5 cents/kWh, with costs of the range of US$35-70/tCO2 avoided. Costs of abatement with carbon capture for other fuels and technologies are also estimated for NOAK plants. The costs of abatement are calculated with reference to conventional SCPC plant for both emissions and costs of electricity. Estimates for both FOAK and NOAK are mainly based on cost data from 2008, which was at the end of a period of sustained escalation in the costs of power generation plant and other large capital projects. There are now indications of costs falling from these levels. This may reduce the costs of abatement and costs presented here may be 'peak of the market' estimates. If general cost levels return, for example, to those prevailing in 2005 to 2006 (by which time significant cost escalation had already occurred from previous levels), then costs of capture and compression for FOAK plants are expected to be US$110/tCO2 avoided (with a range of US$90-135/tCO2 avoided). For NOAK plants costs are expected to be US$25-50/tCO2. Based on these considerations a likely representative range of costs of abatement from CCS excluding transport and storage costs appears to be US$100-150/tCO2 for first-of-a-kind plants and perhaps US$30-50/tCO2 for nth-of-a-kind plants.The estimates for FOAK and NOAK costs appear to be broadly consistent in the light of estimates of the potential for cost reductions with increased experience. Cost reductions are expected from increasing scale, learning on individual components, and technological innovation including improved plant integration. Innovation and integration can both lower costs and increase net output with a given cost base. These factors are expected to reduce abatement costs by approximately 65% by 2030. The range of estimated costs for NOAK plants is within the range of plausible future carbon prices, implying that mature technology would be competitive with conventional fossil fuel plants at prevailing carbon prices.

  12. Update to the Fissile Materials Disposition program SST/SGT transportation estimation

    SciTech Connect (OSTI)

    John Didlake

    1999-11-15T23:59:59.000Z

    This report is an update to ``Fissile Materials Disposition Program SST/SGT Transportation Estimation,'' SAND98-8244, June 1998. The Department of Energy Office of Fissile Materials Disposition requested this update as a basis for providing the public with an updated estimation of the number of transportation loads, load miles, and costs associated with the preferred alternative in the Surplus Plutonium Disposition Final Environmental Impact Statement (EIS).

  13. Contracting with reading costs and renegotiation costs

    E-Print Network [OSTI]

    Brennan, James R.

    2007-01-01T23:59:59.000Z

    Reading Costs, Competition, and ContractReading Costs . . . . . . . . . . . . . . . . C. EquilibriumUnconscionability A?ect Reading Costs . . . . . . . . . .

  14. Lining Over Refractory - Conserve Energy and Capital

    E-Print Network [OSTI]

    Jost, M. L.; Barrows, G. L.

    1980-01-01T23:59:59.000Z

    .~. LINING OVER REFRACTORY - CONSERVE ENERGY & CAPITAL by Mark L. Jost Gerald L. Barrows The Carborundum Company Niagara Falls, New York INTRODUCTION Companies operating industrial heating equip Advantages ment find themselves coming under...

  15. An Introduction to Venture Capital Granite representatives

    E-Print Network [OSTI]

    Anderson, Richard

    May 2006 An Introduction to Venture Capital #12;2 Granite representatives Sam Kingsland ­ Managing;3 Introduction to Granite Ventures Founded in 1992 Granite has 9 investment professionals Over $1B under

  16. North Carolina Capital Access Program (North Carolina)

    Broader source: Energy.gov [DOE]

    The North Carolina Capital Access Program provides matching reserve funds for business loans that are beyond the traditional lending means of a lender’s usual standards. The average CAP loan is ...

  17. 2011-2015 Human Capital Management Plan

    Broader source: Energy.gov [DOE]

    The Office of Legacy Management (LM) needs skilled and engaged staff to accomplish our mission and carry out our responsibilities to the American people. This Human Capital Management Plan (HCMP or...

  18. The Production of Child Human Capital: Endowments, Investments and Fertility

    E-Print Network [OSTI]

    Barrett, Jeffrey A.

    The Production of Child Human Capital: Endowments, Investments and Fertility Anna Aizer Brown the human capital production function. Exploiting an exogenous source of investment, the launch of Head of the production of human capital also support an important role played by early human capital which is largely

  19. Favors from Facebook Friends: Unpacking Dimensions of Social Capital

    E-Print Network [OSTI]

    Michigan, University of

    capital [5, 14, 19]. Social capital is a conceptual framework that considers the resources held by thoseFavors from Facebook Friends: Unpacking Dimensions of Social Capital Yumi Jung, Rebecca Gray]@umich.edu ABSTRACT Past research has demonstrated a link between perceptions of social capital and use of the popular

  20. Rough order of magnitude cost estimate for immobilization of 50MT of plutonium using new faciliites at the Savannah River site: alternative 12A

    SciTech Connect (OSTI)

    DiSabatino, A., LLNL

    1998-06-01T23:59:59.000Z

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 50 metric tons of plutonium using ceramic in a new facility at Savannah River Site (SRS).

  1. Rough order of magnitude cost estimate for immobilization of 50 MT of plutonium using existing facilities at the Savannah River site: alternative 12B

    SciTech Connect (OSTI)

    DiSabatino, A., LLNL

    1998-06-01T23:59:59.000Z

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 50 metric tons of plutonium using ceramic in an existing facility (221-F) at an Savannah River Site (SRS).

  2. Supporting Documentation for the 2008 Update to the Insulation Fact Sheet

    SciTech Connect (OSTI)

    Stovall, Therese K [ORNL

    2008-02-01T23:59:59.000Z

    The Insulation Fact Sheet provides consumers for general guidance and recommended insulation levels for their home. This fact sheet has been on-line since 1995 and this update addresses new insulation materials, as well as updated costs for energy and materials.

  3. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006

    E-Print Network [OSTI]

    2008-01-01T23:59:59.000Z

    information on wind power purchase prices, capital costs,prices and/or negotiated power purchase agreements as muchLab collection of power purchase agreements. To reduce the

  4. WREF 2012: THE PAST AND FUTURE COST OF WIND ENERGY

    SciTech Connect (OSTI)

    NREL,; Wiser, Ryan; Lantz, Eric; Hand, Maureen

    2012-03-26T23:59:59.000Z

    The future of wind power will depend on the ability of the industry to continue to achieve cost reductions. To better understand the potential for cost reductions, this report provides a review of historical costs, evaluates near-term market trends, and summarizes the range of projected costs. It also notes potential sources of future cost reductions. Our findings indicate that steady cost reductions were interrupted between 2004 and 2010, but falling turbine prices and improved turbine performance are expected to drive a historically low LCOE for current installations. In addition, the majority of studies indicate continued cost reductions on the order of 20%-30% through 2030. Moreover, useful cost projections are likely to benefit from stronger consideration of the interactions between capital cost and performance as well as trends in the quality of the wind resource where projects are located, transmission, grid integration, and other cost variables.

  5. AREA COST FACTOR INDEXES PAX NEWSLETTER NO. 3.2.1

    E-Print Network [OSTI]

    US Army Corps of Engineers

    in the continental US). The ACF index is the combination factors of local construction costs of labor, materialAREA COST FACTOR INDEXES PAX NEWSLETTER NO. 3.2.1 2 January 2003 1. The attached updated area cost technical manual TM 5-800-4, Programming Cost Estimates for Military Construction, dated May 1994

  6. AREA COST FACTOR INDEXES PAX NEWSLETTER NO. 3.2.1

    E-Print Network [OSTI]

    US Army Corps of Engineers

    in the continental US). The ACF index is the combination factors of local construction costs of labor, material1 AREA COST FACTOR INDEXES PAX NEWSLETTER NO. 3.2.1 10 April 2001 1. The attached updated area cost technical manual TM 5-800-4, Programming Cost Estimates for Military Construction, dated May 1994

  7. AREA COST FACTOR INDEXES PAX NEWSLETTER NO. 3.2.1

    E-Print Network [OSTI]

    US Army Corps of Engineers

    in the continental US). The ACF index is the combination factors of local construction costs of labor, materialAREA COST FACTOR INDEXES PAX NEWSLETTER NO. 3.2.1 10 March 2000 1. The attached updated area cost technical manual TM 5-800-4, Programming Cost Estimates for Military Construction, dated May 1994

  8. Construction Standards and Costs UC Irvine new construction pursues performance goals and applies quality standards that

    E-Print Network [OSTI]

    Rose, Michael R.

    Construction Standards and Costs UC Irvine new construction pursues performance goals and applies quality standards that affect the costs of capital projects. Periodic re-examination of these goals and standards is warranted. Construction costs are not "high" or "low" in the abstract, but rather in relation

  9. Test Cost Reduction for SOCs Using Virtual TAMs and Lagrange Multipliers

    E-Print Network [OSTI]

    Chakrabarty, Krishnendu

    : 1. Explicit test cost (Cost of investing in a new ATE, also known as Capital Expenditure): ComplexTest Cost Reduction for SOCs Using Virtual TAMs and Lagrange Multipliers Ł Anuja Sehgal˝ as to an underutilization of resources, thereby resulting in an increase in testing time. We present a new technique

  10. Intangible Value Page 1 The Intangible Benefits and Costs of Computer Investments

    E-Print Network [OSTI]

    Intangible Value Page 1 The Intangible Benefits and Costs of Computer Investments: Evidence from the financial market valuation of firms can be used to estimate the intangible costs and benefits of computer for computers in this study as well as the excess returns found for computer capital in other studies. Costly

  11. FUPWG Spring 2010 Providence: Washington Update | Department...

    Energy Savers [EERE]

    Spring 2010 Providence: Washington Update FUPWG Spring 2010 Providence: Washington Update Presentation covers an update on Washington and is given at the Spring 2010 Federal...

  12. Policy Flash 2014-37 Update to the Department of Energy Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts Policy Flash 2014-37 Update to the Department of Energy Acquisition Guide Chapter 16.2,...

  13. PPA Tools and Update

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PPA Tools & Update Chandra Shah chandra.shah@nel.gov October 21, 2010 2 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov * PPA (15 minutes) - Resources - Discussion * URESC (15...

  14. Estimating Marginal Cost of Quality Improvements: The Case of the UK Electricity Distribution Companies

    E-Print Network [OSTI]

    Jamasb, Tooraj; Orea, Luis; Pollitt, Michael G.

    of operational and capital expenditures (Totex) as the dependent variable. Improving quality of services involves operating cost (Opex) and capital cost (Capex) for the utilities. Due to the presence of possible trade-offs between Opex and Capex (Giannakis et... saving Opex than by an equal amount of Capex reduction (Ofgem, 2003a). Hence, in order to examine existence of different strategies in the UK utilities to improve quality, and to ascertain whether the current regulation has distorted the allocation...

  15. Report: EM Human Capital Initiatives

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSAR -Department ofEM Communications August 24, 2006

  16. Cost Analysis of Fuel Cell Systems for Transportation

    E-Print Network [OSTI]

    Cost Analysis of Fuel Cell Systems for Transportation Compressed Hydrogen and PEM Fuel Cell System Discussion Fuel Cell Tech Team FreedomCar Detroit. MI October 20, 2004 TIAX LLC Acorn Park Cambridge Estimates Task 3: Identify Opportunities for System Cost Reduction Tasks 4, 5, 6 & 7: Annual Updates Develop

  17. Polypropylene reinvented: Costs of using metallocene catalysts

    SciTech Connect (OSTI)

    Brockmeier, N.F.

    1996-05-01T23:59:59.000Z

    This study develops scoping estimates of the required capital investment and manufacturing costs to make a zirconocene catalyst/cocatalyst system [(F{sub 6}-acen)Zr(CH{sub 2}CMe{sub 3})(NMe{sub 2}Ph)][B(C{sub 6}F{sub 5}){sub 4}] immobilized on a silica support. Costs for this fluorine-based system are compared with estimates for two other metallocene catalysts using methylaluminoxane (MAO)-based cocatalysts. Including wt of support and cocatalyst, each of the production facilities for making the 3 zirconocene catalyst systems is sized at 364--484 tonnes/year. Cost to make the F-based catalyst system is estimated to be $10780/kg, assuming 20% return on capital invested. Costs for the two MAO-based catalyst system fall in the range of $10950--12160/kg, assuming same return. Within the {plus_minus}50% accuracy of these estimates, these differences are not significant. Given a catalyst productivity of 250 kg resin/gram zirconocene, the cost contribution in the finished ethylene-propylene copolymer resin is 4.4 cents/kg, excluding selling, administrative, research costs.

  18. Pre-Decisional Sodium Bearing Waste Technology Development Roadmap FY-01 Update

    SciTech Connect (OSTI)

    Mc Dannel, Gary Eidson

    2001-09-01T23:59:59.000Z

    This report provides an update to the Sodium Bearing Waste (SBW) Technology Development Roadmap generated a year ago. It outlines progress made to date and near-term plans for the technology development work necessary to support processing SBW. In addition, it serves as a transition document to the Risk Management Plan (RMP) required by the Project per DOE Order 413.3, “Program and Project Management for the Acquisition of Capital Assets.” Technical uncertainties have been identified as design basis elements (DBEs) and captured in a technical baseline database. As the risks are discovered, assessed, and mitigated, the status of the DBEs in the database will be updated and tracked to closure.

  19. Hurricane Katrina, A Climatological Perspective October 2005, Updated August 2006

    E-Print Network [OSTI]

    #12;1 Hurricane Katrina, A Climatological Perspective October 2005, Updated August 2006 1. Introduction Hurricane Katrina is the most costly natural disaster ever to strike the United States, and the deadliest since the Lake Okeechobee disaster (hurricane) of September, 1928. In addition, Katrina was one

  20. Updated 11.17.14 JM UNIVERSITY OF CALIFORNIA

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    Updated 11.17.14 JM UNIVERSITY OF CALIFORNIA OFFICE OF THE CHIEF INVESTMENT OFFICER 1111 BROADWAY of securities or mutual funds to benefit UC Santa Cruz. The UC Office of the Chief Investment Officer provides broker services for securities and mutual fund gifts to the UC Santa Cruz Foundation at no cost. By using

  1. Updating Small Generator Interconnection Procedures for New Market Conditions

    SciTech Connect (OSTI)

    Coddington, M.; Fox, K.; Stanfield, S.; Varnado, L.; Culley, T.; Sheehan, M.

    2012-12-01T23:59:59.000Z

    Federal and state regulators are faced with the challenge of keeping interconnection procedures updated against a backdrop of evolving technology, new codes and standards, and considerably transformed market conditions. This report is intended to educate policymakers and stakeholders on beneficial reforms that will keep interconnection processes efficient and cost-effective while maintaining a safe and reliable power system.

  2. Academy Member Annual Update Report 1Academy Member Update Report

    E-Print Network [OSTI]

    Academy Member Annual Update Report 1Academy Member Update Report The annual update report is an important activity associated with active membership in the Academy. These reports are due annually@lsuhsc.edu or call 504-568-2140 if you have other questions. Why an annual report? As an Academy member

  3. Capital gains tax treatment and the cattleman

    E-Print Network [OSTI]

    Rister, M. Edward

    1976-01-01T23:59:59.000Z

    Major Subject: Agricultural Economics CAPITAL GAINS TAX TREATMENT AND THE CATTLEMAN A Thesis by M I LTDN EDWARD R I STE R Approved as to style and content by: airman o ommi e Dr. Ronald R. Kay Head o D artment Dr. John opkin Mem er Dr. Donald... R. Levi e er Dr. Howard Hesby December 1976 ABSTRACT Capital Gains Tax Treatment and the Catt leman. (December 1976) Milton Edward Rister, B. S. , Texas ASM University Chairman of Advisory Committee: Or. Ronald D. Kay The federal tax...

  4. Capital Electric Coop, Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovation inOpen EnergyCallawayCapara Energia S A Jump to:CapitalCapital

  5. Program Review Updates and Briefings

    Broader source: Energy.gov [DOE]

    You can learn more about the U.S. Department of Energy (DOE) Geothermal Technologies Program by reading its program review updates and program briefings. These updates and briefings feature...

  6. 2011 Cost of Wind Energy Review

    SciTech Connect (OSTI)

    Tegen, S.; Lantz, E.; Hand, M.; Maples, B.; Smith, A.; Schwabe, P.

    2013-03-01T23:59:59.000Z

    This report describes the levelized cost of energy (LCOE) for a typical land-based wind turbine installed in the United States in 2011, as well as the modeled LCOE for a fixed-bottom offshore wind turbine installed in the United States in 2011. Each of the four major components of the LCOE equation are explained in detail, such as installed capital cost, annual energy production, annual operating expenses, and financing, and including sensitivity ranges that show how each component can affect LCOE. These LCOE calculations are used for planning and other purposes by the U.S. Department of Energy's Wind Program.

  7. An examination of the costs and critical characteristics of electric utility distribution system capacity enhancement projects

    SciTech Connect (OSTI)

    Balducci, Patrick J.; Schienbein, Lawrence A.; Nguyen, Tony B.; Brown, Daryl R.; Fathelrahman, Eihab M.

    2004-06-01T23:59:59.000Z

    This report classifies and analyzes the capital and total costs (e.g., income tax, property tax, depreciation, centralized power generation, insurance premiums, and capital financing) associated with 130 electricity distribution system capacity enhancement projects undertaken during 1995-2002 or planned in the 2003-2011 time period by three electric power utilities operating in the Pacific Northwest. The Pacific Northwest National Laboratory (PNNL), in cooperation with participating utilities, has developed a large database of over 3,000 distribution system projects. The database includes brief project descriptions, capital cost estimates, the stated need for each project, and engineering data. The database was augmented by additional technical (e.g., line loss, existing substation capacities, and forecast peak demand for power in the area served by each project), cost (e.g., operations, maintenance, and centralized power generation costs), and financial (e.g., cost of capital, insurance premiums, depreciations, and tax rates) data. Though there are roughly 3,000 projects in the database, the vast majority were not included in this analysis because they either did not clearly enhance capacity or more information was needed, and not available, to adequately conduct the cost analyses. For the 130 projects identified for this analysis, capital cost frequency distributions were constructed, and expressed in terms of dollars per kVA of additional capacity. The capital cost frequency distributions identify how the projects contained within the database are distributed across a broad cost spectrum. Furthermore, the PNNL Energy Cost Analysis Model (ECAM) was used to determine the full costs (e.g., capital, operations and maintenance, property tax, income tax, depreciation, centralized power generation costs, insurance premiums and capital financing) associated with delivering electricity to customers, once again expressed in terms of costs per kVA of additional capacity. The projects were sorted into eight categories (capacitors, load transfer, new feeder, new line, new substation, new transformer, reconductoring, and substation capacity increase) and descriptive statistics (e.g., mean, total cost, number of observations, and standard deviation) were constructed for each project type. Furthermore, statistical analysis has been performed using ordinary least squares regression analysis to identify how various project variables (e.g., project location, the primary customer served by the project, the type of project, the reason for the upgrade, size of the upgrade) impact the unit cost of the project.

  8. Richmond Bay Campus: Project Update

    E-Print Network [OSTI]

    Lee, Jason R.

    Coordinate with City of Richmond South Shoreline Area planning #12;Richmond Bay Campus Vision A stateRichmond Bay Campus: Project Update Prepared for the Richmond City Council October 1, 2013 #12 and UCB · City of Richmond Updates · Summary · Questions & Answers #12;LBNL Project Update #12;University

  9. Information Updates: Position/Title

    E-Print Network [OSTI]

    Sheridan, Jennifer

    Information Updates: Name: Position/Title: Business Mailing Address: Home Mailing Address: Phone of nurse involvement and patient education. She is an active nurse leader that brings thoughtful discussion be a chapter update for upcoming future events and plans for the future. Don't miss this exciting update! Beta

  10. CAC Update: HFBR and BGRR

    E-Print Network [OSTI]

    Homes, Christopher C.

    rod blades and casks has been installed and tested #12;HFBR Update #12;HFBR Update Personnel have been on procedures for completing the work · Drills and dry-runs have been conducted to develop worker proficiency under normal and off-normal conditions #12;HFBR Update Transportation cask Certificates of Compliance

  11. Engineering Costs and Production Economics, 2 1 ( 199 I ) 81-92 81 Minimizing production costs for a robotic assembly system

    E-Print Network [OSTI]

    Dessouky, Maged

    costs for a robotic assembly system Maged M. Dessouky Department oflndustrial Engineeringand Operations life of a robotic assembly system that is integrated with an Automatic Storage/Retrieval System (AS for the assembly robots as well as the inventory policy for the AS/RS. Capital cost of equipment depends

  12. Capital Controls: Mud in the Wheels of Market Discipline

    E-Print Network [OSTI]

    Forbes, Kristin J.

    2004-03-12T23:59:59.000Z

    Widespread support for capital account liberalization in emerging markets has recently shifted to skepticism and even support for capital controls in certain circumstances. This sea-change in attitudes has been bolstered ...

  13. WORKING PAPER N 2009 -41 Migration and capital accumulation

    E-Print Network [OSTI]

    Boyer, Edmond

    , remittances, capital accumulation, rural poverty PARIS-JOURDAN SCIENCES ECONOMIQUES LABORATOIRE D. Key Words: Migration; Remittances; Capital Accumulation; Rural Poverty. Paris School of Economics (PSE) and Poverty Action Lab (J-PAL Europe), 48 Boulevard Jourdan, 75014 Paris, France. chiodi

  14. CapitalProjects TrackingManual

    E-Print Network [OSTI]

    the Colorado School of Mine's capital projects from inception to completion. The task of monitoring#_____________ 1. Check Budget for required signatures 2. Assign Index Number from excel file "Available 9xxxxx projects 2. FM = 51886 ­ for Facilities Management projects 4. Assign Program code 1. 1700 = Operation/Maintenance

  15. Taxation and Capital Spending Alan J. Auerbach

    E-Print Network [OSTI]

    Sadoulet, Elisabeth

    of the Federal Reserve System, October 7, 2005. #12;I. Introduction Why should macroeconomists care about of capital accumulation and hence the rate of economic growth. Current discussions of fundamental tax reform of consumption and the health of the financial sector. I limit my focus to business fixed investment

  16. A hedge fund business plan : investment theory, operations, and capital raising for Broadgates Capital Management

    E-Print Network [OSTI]

    Mills, Jeffrey David

    2014-01-01T23:59:59.000Z

    Launching a start-up hedge fund is a complex, multifaceted endeavor that requires an understanding of the interconnectivity between capital raising, investment strategy, regulation, and fund operations. The purpose of this ...

  17. Rough order of magnitude cost estimate for immobilization of 18.2 MT of plutonium using existing facilities at the Savannah River site: alternatives 3A/5A/6A/6B/7A/9A

    SciTech Connect (OSTI)

    DiSabatino, A., LLNL

    1998-06-01T23:59:59.000Z

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 18.2 metric tons (nominal) of plutonium using ceramic in a new facility at Savannah River Site (SRS).

  18. Costing of Joining Methods -Arc Welding Costs

    E-Print Network [OSTI]

    Colton, Jonathan S.

    Costing of Joining Methods - Arc Welding Costs ver. 1 ME 6222: Manufacturing Processes and Systems Prof. J.S. Colton © GIT 2009 1 #12;OverviewOverview · Cost components · Estimation of costsEstimation of costs · Examples ME 6222: Manufacturing Processes and Systems Prof. J.S. Colton © GIT 2009 2 #12;Cost

  19. WECC and Peak Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WECC and Peak Update Transmission B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-decisional. For Discussion Purposes Only. WECC and Peak Background In the...

  20. RESEARCH UPDATE Ecology Division

    E-Print Network [OSTI]

    1 RESEARCH UPDATE Ecology Division Biotype has changed its name to Ecotype! Following the re-organisation of Forest Research into five science Divisions and three Support Divisions, the former Woodland Ecology Branches to form the new Ecology Division. We decided to give the divisional newsletter a new name (and

  1. Tier I Canada Research Chair Human Capital and Productivity

    E-Print Network [OSTI]

    Lennard, William N.

    Tier I Canada Research Chair in Human Capital and Productivity The University of Western Ontario and international candidates for a Tier I Canada Research Chair in the area of Human Capital and Productivity renowned group of economists who work on research related to human capital and productivity. This includes

  2. Energy Cost Reduction Measures Identified for Texas State Agencies

    E-Print Network [OSTI]

    Grigg, T. J.; Verdict, M. E.

    1987-01-01T23:59:59.000Z

    conservation opportunities and capital intensive energy cost reduction measures. Though more square feet was audited in 1984, more utility cost savings per square foot were identified in 1986. Changes in the screening process, the audit report format... square foot for the audited facilities by building type. Maintenance and operation savings are included in this table. A sufficient number of academic buildings, medical research facilities, libraries, hospitals, and office buildings were audited...

  3. Microsoft PowerPoint - EM_Update.061011.pptx

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_Cost Estimating Panel Microsoft PowerPoint -ofUpdatesUpdate

  4. When Equal is Not Equitable: Adjusting for Geographic Differences in Education Costs

    E-Print Network [OSTI]

    Taylor, Lori L.

    cost differences into its school funding formula with the Texas Cost of Education Index (CEI), but the CEI has not been updated since its creation 25 years ago. The pattern of costs has shifted dramatically in Texas since then and school districts face...

  5. AREA COST FACTOR INDEXES PAX NEWSLETTER NO. 3.2.1

    E-Print Network [OSTI]

    US Army Corps of Engineers

    in the continental US). The ACF index is the combination factors of local construction costs of labor, materialAREA COST FACTOR INDEXES PAX NEWSLETTER NO. 3.2.1 15 December 2003 1. The attached updated area of the Army technical manual TM 5-800-4, Programming Cost Estimates for Military Construction, dated May 1994

  6. LeZi-Update: An Information-Theoretic Approach to Track Mobile Users in PCS Networks*

    E-Print Network [OSTI]

    Bhattacharya, Amiya

    -to-fixed length encoding of the acclaimed Lempel- Ziv family of algorithms reduces the update cost, whereas their built-in predictive power can be effectively used to re- duce paging cost. 1 Introduction Seamless, while enjoy- ing the freedom of being mobile, the user creates an un- certainty about the exact location

  7. Estimating Specialty Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    Specialty costs are those nonstandard, unusual costs that are not typically estimated. Costs for research and development (R&D) projects involving new technologies, costs associated with future regulations, and specialty equipment costs are examples of specialty costs. This chapter discusses those factors that are significant contributors to project specialty costs and methods of estimating costs for specialty projects.

  8. NPR (New Production Reactor) capacity cost evaluation

    SciTech Connect (OSTI)

    none,

    1988-07-01T23:59:59.000Z

    The ORNL Cost Evaluation Technical Support Group (CETSG) has been assigned by DOE-HQ Defense Programs (DP) the task defining, obtaining, and evaluating the capital and life-cycle costs for each of the technology/proponent/site/revenue possibilities envisioned for the New Production Reactor (NPR). The first part of this exercise is largely one of accounting, since all NPR proponents use different accounting methodologies in preparing their costs. In order to address this problem of comparing ''apples and oranges,'' the proponent-provided costs must be partitioned into a framework suitable for all proponents and concepts. If this is done, major cost categories can then be compared between concepts and major cost differences identified. Since the technologies proposed for the NPR and its needed fuel and target support facilities vary considerably in level of technical and operational maturity, considerable care must be taken to evaluate the proponent-derived costs in an equitable manner. The use of cost-risk analysis along with derivation of single point or deterministic estimates allows one to take into account these very real differences in technical and operational maturity. Chapter 2 summarizes the results of this study in tabular and bar graph form. The remaining chapters discuss each generic reactor type as follows: Chapter 3, LWR concepts (SWR and WNP-1); Chapter 4, HWR concepts; Chapter 5, HTGR concept; and Chapter 6, LMR concept. Each of these chapters could be a stand-alone report. 39 refs., 36 figs., 115 tabs.

  9. Updated Buildings Sector Appliance and Equipment Costs and Efficiency

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at Commercial and InstitutionalArea:Mnt(N) COFeet) Decade3445Full

  10. Updated Buildings Sector Appliance and Equipment Costs and Efficiency

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at Commercial and InstitutionalArea:Mnt(N) COFeet)

  11. Updated Buildings Sector Appliance and Equipment Costs and Efficiency

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron SpinPrinceton PlasmaAfternoon TalksDigitalRevision toNetworkMay 9,Full

  12. Updated Costs (June 2011 Basis) for Selected Bituminous Baseline Cases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron SpinPrinceton PlasmaAfternoon TalksDigitalRevision

  13. Updated Cost Analysis of Photobiological Hydrogen Production from

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your DensityEnergy U.S.-China Electric Vehicle and03/02 TUE 08:59 FAX 423Department ofChlamydomonas reinhardtii

  14. Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems...

    Broader source: Energy.gov (indexed) [DOE]

    This report is the seventh annual update of a comprehensive automotive fuel cell cost analysis conducted by Strategic Analysis under contract to the U.S. Department of Energy. In...

  15. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Direct H2 PEM Fuel Cell Systems for Automotive Application: 2009 Update Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Application: 2009...

  16. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mass Production Cost Estimation for Direct H 2 PEM Fuel Cell Systems for Automotive Applications: 2008 Update March 26, 2009 v.30.2021.052209 Prepared by: Brian D. James & Jeffrey...

  17. Evaluation of the Total Cost of Ownership of Fuel Cell-Powered Material Handling Equipment

    SciTech Connect (OSTI)

    Ramsden, T.

    2013-04-01T23:59:59.000Z

    This report discusses an analysis of the total cost of ownership of fuel cell-powered and traditional battery-powered material handling equipment (MHE, or more typically 'forklifts'). A number of fuel cell MHE deployments have received funding support from the federal government. Using data from these government co-funded deployments, DOE's National Renewable Energy Laboratory (NREL) has been evaluating the performance of fuel cells in material handling applications. NREL has assessed the total cost of ownership of fuel cell MHE and compared it to the cost of ownership of traditional battery-powered MHE. As part of its cost of ownership assessment, NREL looked at a range of costs associated with MHE operation, including the capital costs of battery and fuel cell systems, the cost of supporting infrastructure, maintenance costs, warehouse space costs, and labor costs. Considering all these costs, NREL found that fuel cell MHE can have a lower overall cost of ownership than comparable battery-powered MHE.

  18. Example G Cost of construction of nuclear power plants Description of data

    E-Print Network [OSTI]

    Reid, Nancy

    1 Example G Cost of construction of nuclear power plants Description of data Table G.1 gives reactor (LWR) power plants constructed in USA. It is required to predict the capital cost involved in the construction of further LWR power plants. The notation used in Table G.1 is explained in Table G.2. The final 6

  19. Example G Cost of construction of nuclear power plants Description of data

    E-Print Network [OSTI]

    Reid, Nancy

    Example G Cost of construction of nuclear power plants Description of data Table G.1 gives data) power plants constructed in USA. It is required to predict the capital cost involved in the construction of further LWR power plants. The notation used in Table G.1 is explained in Table G.2. The final 6 lines

  20. Cost and Performance Assumptions for Modeling Electricity Generation Technologies

    SciTech Connect (OSTI)

    Tidball, R.; Bluestein, J.; Rodriguez, N.; Knoke, S.

    2010-11-01T23:59:59.000Z

    The goal of this project was to compare and contrast utility scale power plant characteristics used in data sets that support energy market models. Characteristics include both technology cost and technology performance projections to the year 2050. Cost parameters include installed capital costs and operation and maintenance (O&M) costs. Performance parameters include plant size, heat rate, capacity factor or availability factor, and plant lifetime. Conventional, renewable, and emerging electricity generating technologies were considered. Six data sets, each associated with a different model, were selected. Two of the data sets represent modeled results, not direct model inputs. These two data sets include cost and performance improvements that result from increased deployment as well as resulting capacity factors estimated from particular model runs; other data sets represent model input data. For the technologies contained in each data set, the levelized cost of energy (LCOE) was also evaluated, according to published cost, performance, and fuel assumptions.

  1. Cost Sharing What is Cost Sharing?

    E-Print Network [OSTI]

    Tsien, Roger Y.

    sharing using various data fields (bin, fund, PI, index, etc.) x Create a Bin Generate a bin where cost;3 Cost Sharing Steps Search for & Create a Bin Search Results Display Select AWARD Type the correct data1 Cost Sharing What is Cost Sharing? x Cost sharing is a commitment to use university resources

  2. Texas Electricity Update

    E-Print Network [OSTI]

    Lloyd, B.

    2012-01-01T23:59:59.000Z

    Texas Electricity Update CATEE 2012 Galveston, Texas Brian Lloyd Executive Director Public Utility Commission of Texas October 10, 2012 1 2 Drought Summary May Reserve Margin Report 3 Demand Growth by Region 4 105? Normal... 917 Firm Load Forecast, MW 65,649 68,403 71,692 73,957 75,360 76,483 CATEE 2012 Questions? Brian H. Lloyd Executive Director Public Utility Commission of Texas 512-936-7040 14 ...

  3. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    End Use: December 2014 Retail ratesprices and consumption In this section, we look at what electricity costs and how much is purchased. Charges for retail electric service are...

  4. Download Data | Transparent Cost Database

    Open Energy Info (EERE)

    You are here Home Download Data Click to download data from the following areas: Generation data - last updated November 14, 2014. Fuels data - last updated August 8, 2014....

  5. Update of Part 61 Impacts Analysis Methodology. Methodology report. Volume 1

    SciTech Connect (OSTI)

    Oztunali, O.I.; Roles, G.W.

    1986-01-01T23:59:59.000Z

    Under contract to the US Nuclear Regulatory Commission, the Envirosphere Company has expanded and updated the impacts analysis methodology used during the development of the 10 CFR Part 61 rule to allow improved consideration of the costs and impacts of treatment and disposal of low-level waste that is close to or exceeds Class C concentrations. The modifications described in this report principally include: (1) an update of the low-level radioactive waste source term, (2) consideration of additional alternative disposal technologies, (3) expansion of the methodology used to calculate disposal costs, (4) consideration of an additional exposure pathway involving direct human contact with disposed waste due to a hypothetical drilling scenario, and (5) use of updated health physics analysis procedures (ICRP-30). Volume 1 of this report describes the calculational algorithms of the updated analysis methodology.

  6. Progress Update: TRU Waste Shipping

    ScienceCinema (OSTI)

    Cody, Tom

    2012-06-14T23:59:59.000Z

    A progress update at the Savannah River Site. A continued effort on shipping TRU waste to WIPP in Carlsbad, New Mexico.

  7. Agricultural and Resource Economics Update

    E-Print Network [OSTI]

    2012-01-01T23:59:59.000Z

    Consumer Choices of Genetically Modified Food. ” ARE UpdateConsumer Choices of Genetically Modified Food Amir HeimanConsumer Choices of Genetically Modified Food Amir Heiman

  8. Agricultural and Resource Economics Update

    E-Print Network [OSTI]

    Lee, Hyunok; Sumner, Daniel A.; Martin, Philip; Hochman, Gal; Rajagopal, Deepak; Zilberman, David

    2011-01-01T23:59:59.000Z

    Environmental Impact of Biofuels. ” ARE Update 15(2):9-11.and the Environmental Impact of Biofuels Gal Hochman, Deepakand the Environmental Impact of Biofuels Gal Hochman, Deepak

  9. Agricultural and Resource Economics Update

    E-Print Network [OSTI]

    2012-01-01T23:59:59.000Z

    Analysis for Evaluating Biofuels. ” ARE Update 11(3) (2008):the RFS conventional biofuels mandate is severely harmingThe first is growth in biofuels demand. Notably, corn

  10. Analysis of Cycling Costs in Western Wind and Solar Integration Study

    SciTech Connect (OSTI)

    Jordan, G.; Venkataraman, S.

    2012-06-01T23:59:59.000Z

    The Western Wind and Solar Integration Study (WWSIS) examined the impact of up to 30% penetration of variable renewable generation on the Western Electricity Coordinating Council system. Although start-up costs and higher operating costs because of part-load operation of thermal generators were included in the analysis, further investigation of additional costs associated with thermal unit cycling was deemed worthwhile. These additional cycling costs can be attributed to increases in capital as well as operations and maintenance costs because of wear and tear associated with increased unit cycling. This analysis examines the additional cycling costs of the thermal fleet by leveraging the results of WWSIS Phase 1 study.

  11. Employee Replacement Costs

    E-Print Network [OSTI]

    Dube, Arindrajit; Freeman, Eric; Reich, Michael

    2010-01-01T23:59:59.000Z

    Samuel Schenker, “The Costs of Hir- u ing Skilled Workers”,Employee Replacement Costs Arindrajit Dube, Eric Freeman andof employee replacement costs, using a panel survey of

  12. Employee Replacement Costs

    E-Print Network [OSTI]

    Dube, Arindrajit; Freeman, Eric; Reich, Michael

    2010-01-01T23:59:59.000Z

    Employee Replacement Costs Arindrajit Dube, Eric Freeman andproperties of employee replacement costs, using a panel2008. We establish that replacement costs are sub- stantial

  13. 1 POSTGRADUATE SCHOLARSHIPS UPDATE -July -August 2014 Postgraduate Scholarships Update

    E-Print Network [OSTI]

    Frean, Marcus

    - August 2014 ADDRESSENQUIRIESAND YOURCOMPLETEDFORMTO: SCHOLARSHIPSMANAGER ScholarshipsOffice Victoria1 POSTGRADUATE SCHOLARSHIPS UPDATE - July - August 2014 Postgraduate Scholarships Update JulyUniversityofWellington POBox600 Wellington6140 NewZealand PHONE +64-4-4635113 EMAIL scholarships-office@vuw.ac.nz WEBSITE www.victoria

  14. A comparison of the cost of urban transportation modes

    E-Print Network [OSTI]

    Hatchell, William Jack

    1968-01-01T23:59:59.000Z

    in the fi &ed way an? the operatin cost of the passenger vuhicle. co ' t ? f ectivene: s ana' ye is is conducted us i &g the capital a. . d op ra!. ing costs of each of the six modes. '!he modes are cam- per d on the basis of their seating capacity... of the oass n:ar v& h? Le sre ccmbined to offer a cost rou&parison for peak- !'cur & ause?ger vc lumes ranging from 4, 000 to 24, 000 passengers per ! ?ul' Thc author wishes to express his appreciation to Dr. Vergil G. Stover, Cojemi ttee i...

  15. Building America Residential Energy Efficiency Technical Update...

    Energy Savers [EERE]

    Residential Energy Efficiency Technical Update Meeting: August 2011 Building America Residential Energy Efficiency Technical Update Meeting: August 2011 On this page, you may link...

  16. Energy Storage Systems 2010 Update Conference Presentations ...

    Energy Savers [EERE]

    Systems 2010 Update Conference Presentations - Day 1, Session 1 Energy Storage Systems 2010 Update Conference Presentations - Day 1, Session 1 The U.S. DOE Energy Storage Systems...

  17. Generation IV International Forum Updates Technology Roadmap...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Updates Technology Roadmap and Builds Future Collaboration Generation IV International Forum Updates Technology Roadmap and Builds Future Collaboration December 31, 2013 - 12:14pm...

  18. Utility Energy Services Contracts: Enabling Documents Update...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Update Utility Energy Services Contracts: Enabling Documents Update Presentation covers the FUPWG Fall Meeting, held on November 28-29, 2007 in San Diego, California....

  19. Natural Capital Management: An Evolutionary Paradigm for Sustainable Restoration Investment - 13455

    SciTech Connect (OSTI)

    Koetz, Maureen T. [Koetz and Duncan LLC, Suite 30J, 355 South End Avenue, New York, NY 10280 (United States)] [Koetz and Duncan LLC, Suite 30J, 355 South End Avenue, New York, NY 10280 (United States)

    2013-07-01T23:59:59.000Z

    Unlike other forms of capital assets (built infrastructure, labor, financial capital), the supply of usable or accessible air, land, and water elements (termed Natural Capital Assets or NCA) available to enterprise processes is structurally shrinking due to increased demand and regulatory restriction. This supply/demand imbalance is affecting all forms of public and private enterprise (including Federal Facilities) in the form of encroachment, production limits, cost increases, and reduced competitiveness. Department of Energy (DOE) sites are comprised of significant stocks of NCA that function as both conserved capital (providing ecosystem services and other reserve capacity), and as natural infrastructure (supporting major Federal enterprise programs). The current rubric of 'Environmental Stewardship' provides an unduly constrained management paradigm that is focused largely on compliance process metrics, and lacks a value platform for quantifying, documenting, and sustainably re-deploying re-capitalized natural asset capacity and capability. By adopting value-based system concepts similar to built infrastructure accounting and information management, 'stewarded' natural assets relegated to liability- or compliance-focused outcomes become 're-capitalized' operational assets able to support new or expanded mission. This growing need for new accounting and management paradigms to capture natural capital value is achieving global recognition, most recently by the United Nations, world leaders, and international corporations at the Rio+20 Summit in June of 2012. Natural Capital Asset Management (NCAM){sup TM} is such an accounting framework tool. Using a quantification-based design, NCAM{sup TM} provides inventory, capacity and value data to owners or managers of natural assets such as the DOE that parallel comparable information systems currently used for facility assets. Applied to Environmental Management (EM) and other DOE program activities, the natural asset capacity and value generated by EM projects and other investment and operational programming can be recorded and then allocated to mission and/or ecosystem needs as part of overall site, complex, and Federal decision-making. NCAM{sup TM} can also document post-restoration asset capability and value for use in weighing loss mitigation and ecosystem damage claims arising from past operational activities. A prototype NCAM{sup TM} evaluation developed at the Savannah River Site (SRS) demonstrates use of this framework as an advanced paradigm for NCA accounting and decision-making for the larger DOE complex and other enterprise using natural capital in operations. Applying a quantified value paradigm, the framework catalogues the results of activities that sustain, restore, and modernize natural assets for enterprise-wide value beyond that of compliance milestones. Capturing and assigning recapitalization value using NCAM{sup TM} concepts and tools improves effective reuse of taxpayer-sustained assets, records ecosystem service value, enables mission and enterprise optimization, and assures the sustainability of shared natural capital assets in regional pools vital to both complex sites and local and regional economies. (authors)

  20. Starship Sails Propelled by Cost-Optimized Directed Energy

    E-Print Network [OSTI]

    Benford, James

    2011-01-01T23:59:59.000Z

    Microwave propelled sails are a new class of spacecraft using photon acceleration. It is the only method of interstellar flight that has no physics issues. Laboratory demonstrations of basic features of beam-driven propulsion, flight, stability ('beam-riding'), and induced spin, have been completed in the last decade, primarily in the microwave. It offers much lower cost probes after a substantial investment in the launcher. Engineering issues are being addressed by other applications: fusion (microwave, millimeter and laser sources) and astronomy (large aperture antennas). There are many candidate sail materials: carbon nanotubes and microtrusses, graphene, beryllium, etc. For acceleration of a sail, what is the cost-optimum high power system? Here the cost is used to constrain design parameters to estimate system power, aperture and elements of capital and operating cost. From general relations for cost-optimal transmitter aperture and power, system cost scales with kinetic energy and inversely with sail di...

  1. Cost and Performance Model for Redox Flow Batteries

    SciTech Connect (OSTI)

    Viswanathan, Vilayanur V.; Crawford, Aladsair J.; Stephenson, David E.; Kim, Soowhan; Wang, Wei; Li, Bin; Coffey, Greg W.; Thomsen, Edwin C.; Graff, Gordon L.; Balducci, Patrick J.; Kintner-Meyer, Michael CW; Sprenkle, Vincent L.

    2014-02-01T23:59:59.000Z

    A cost model was developed for all vanadium and iron-vanadium redox flow batteries. Electrochemical performance modeling was done to estimate stack performance at various power densities as a function of state of charge. This was supplemented with a shunt current model and a pumping loss model to estimate actual system efficiency. The operating parameters such as power density, flow rates and design parameters such as electrode aspect ratio, electrolyte flow channel dimensions were adjusted to maximize efficiency and minimize capital costs. Detailed cost estimates were obtained from various vendors to calculate cost estimates for present, realistic and optimistic scenarios. The main drivers for cost reduction for various chemistries were identified as a function of the energy to power ratio of the storage system. Levelized cost analysis further guided suitability of various chemistries for different applications.

  2. Human Capital Accountability Program--Withdrawn

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-11-15T23:59:59.000Z

    Withdrawn 3-26-14. The purpose of maintaining and updating this directive is to (1) Ensure compliance with applicable laws, regulations, and other directives. (2) Reduce the risk of DOE losing any of its personnel authorities. (3) Incorporate functional accountability to ensure that Human Resource Directors' position descriptions and classifications are appropriate, selections result in quality leadership with skills needed, and performance plans and evaluations are consistent with Department and Administration human resources priorities and audit findings.

  3. Next Update: November 2013

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghurajiConventionalMississippi"site. IfProved(Million Barrels)21 4.65 2013 Next Update: November

  4. Next Update: November 2013

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghurajiConventionalMississippi"site. IfProved(Million Barrels)21 4.65 2013 Next Update:

  5. Hopper Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC) EnvironmentalGyroSolé(tm) HarmonicbetandEnergy 2010 A File Storage Updates and

  6. Carver Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisiting the TWPSuccess StoriesFebruary 26,ComputersTrinitytheOptimization Updates and

  7. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del SolStrengthening aTurbulence mayUndergraduateAbout Us Updates and Status Current

  8. Timeline and updates

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del SolStrengthening a solidSynthesis ofwasSynchrotron RadiationTimeline and Updates

  9. Long Branch Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant Jump to:Landowners andLodgepole, Nebraska: EnergyLomita,Capital Jump to: navigation,

  10. Longboard Capital Advisors | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant Jump to:Landowners andLodgepole, Nebraska:Longboard Capital Advisors Jump to:

  11. Absolute Energy Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit withTianlinPapersWindey Wind6:00-06:00About OpenEI Jump to:Absecon, NewCapital

  12. IT Capital Planning | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you sure you want toworldPowerHome| DepartmentPumpHomeof EnergyofIT Capital

  13. Sequoia Capital Ltda | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit with form HistoryRistma AG Jump638324°,Schnell ZToolsSupply ofSequoia Capital

  14. Jane Capital Partners | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetecGtelInterias SolarJane Capital Partners Jump to: navigation, search Logo:

  15. MVP Capital Partners | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRose Bend < MHKconverter <WAG BuoyYOG <MP2 CapitalLLCMSEMUTIMVP

  16. Sindicatum Carbon Capital SCC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f < RAPID‎ |Rippey JumpAirPowerSilcio SASindicatum Carbon Capital SCC

  17. Chestnut Capital LLC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovation inOpenadd: ChinaInformationChestnut Capital LLC Jump to:

  18. Working Capital for Contractors | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2, 2015Visiting Strong,Women @ Energy:Terri Workers'WorkforceCapital for

  19. Mont Vista Capital LLC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRose BendMiasole IncMinutemanVista Capital LLC Place: New York, New York

  20. New Energy Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRoseConcerns Jump to:Neppel Wind PowerNevadaPennsylvania:Capital Jump to:

  1. Nimes Capital LLC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRoseConcerns Jump to:Neppelsource History(CTI PFAN) | OpenNimes Capital

  2. Transmission Capital Limited | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f <MaintainedInformationThePtyTownTrama TecnoTransmission Capital

  3. Strategic Capital Investments LLC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit with formSoutheastern IL ElecStrategic Capital Investments LLC Jump to:

  4. Atlantic Ethanol Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomass Conversions Inc Jump to: navigation, search Name:Ethanol Capital Jump to:

  5. Conservation Capital LLC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:PowerCER.png ElColumbia,2005)Conservation Capital LLC Jump to:

  6. Cora Capital Advisors | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:PowerCER.pngRoofs and Heat Islands Jump to:Coppell, Texas:Cora Capital

  7. Prospect Capital Corporation | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I GeothermalPotentialBiopowerSolidGenerationMethod Jump to:This propertyVolume Jump to:s)Prospect Capital

  8. RAM Capital Management Group | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I GeothermalPotentialBiopowerSolidGenerationMethod JumpGeorgia: Energy Resources JumpRAM Capital Management

  9. Black Coral Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovation in CarbonofBiotins Energia Jump to: navigation,BirahiCoral Capital

  10. EnerTech Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualPropertyd8c-a9ae-f8521cbb8489 No revision| OpenElectromagneticElmwoodEnerSpective JumpCapital

  11. An Exploratory Initiative for Improving Low-Cost Housing in Texas

    E-Print Network [OSTI]

    McKittrick, T. L.; Haberl, J. S.; Graham, C. W.; Claridge, D. E.; Swain, W. B.

    2000-01-01T23:59:59.000Z

    professionals and experts in the affordable-housing industry, ? to gather consensus on the importance of the proposed issues, ? to develop consensus on methods of capitalizing on opportunities / needs for improvement, overcoming constraints on improvement... group of experts in a particular field on issues pertinent to that field through an iterative survey process. Consensus is developed through an iterative process of surveying experts (respondents)?and continually updating the survey to reflect...

  12. NREL Activities to Open Capital Market Investment and Bank Lending...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to Open Capital Market Investment and Bank Lending for Solar Deployment For NREL Finance Team Website Michael Mendelsohn and John Johsi U.S. Department of Energy Washington,...

  13. New York State Capital District Regional Middle School Science...

    Office of Science (SC) Website

    New York State Capital District Regional Middle School Science Bowl National Science Bowl (NSB) NSB Home About High School Middle School Middle School Students Middle School...

  14. Delegation of Acquisition Executive Authority for Capital Asset...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PortsmouthPaducah Project Office by murphie DelegationAcquisitionExecAuthorityCapitalAssetProjPPPO-MurphieEM.pdf -- PDF Document, 284 KB ID: NA Type: Organizations' Assignment...

  15. Credit Enhancements and Capital Markets to Fund Solar Deployment...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Credit Enhancements and Capital Markets to Fund Solar Deployment: Leveraging Public Funds to Open Private Sector Investment Michael Mendelsohn and Marley Urdanick National...

  16. Audit of the internal control structure of the Department of Energy`s Working Capital Fund

    SciTech Connect (OSTI)

    NONE

    1997-10-08T23:59:59.000Z

    The Subcommittee on Energy and Water Development of the Committee on Appropriations, in its report dated July 16, 1996, approved the implementation of a Working Capital Fund (Fund) at the U.S. Department of Energy. The Subcommittee also directed the Office of Inspector General to conduct periodic audits of the Fund. This audit was conducted to determine if the Department established an effective system of controls over the Fund. The specific objectives were to determine if internal controls were sufficient to ensure that appropriate costs were allocated in a reasonable and unbiased manner and in a way what was consistent with the expectations established by the Congress.

  17. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    increase consumption. On the supply side, increases in the average cost of fossil fuel to power plants (9.2%), including a 26.6% increase in natural gas prices, added to the...

  18. AN OVERVIEW OF TOOL FOR RESPONSE ACTION COST ESTIMATING (TRACE)

    SciTech Connect (OSTI)

    FERRIES SR; KLINK KL; OSTAPKOWICZ B

    2012-01-30T23:59:59.000Z

    Tools and techniques that provide improved performance and reduced costs are important to government programs, particularly in current times. An opportunity for improvement was identified for preparation of cost estimates used to support the evaluation of response action alternatives. As a result, CH2M HILL Plateau Remediation Company has developed Tool for Response Action Cost Estimating (TRACE). TRACE is a multi-page Microsoft Excel{reg_sign} workbook developed to introduce efficiencies into the timely and consistent production of cost estimates for response action alternatives. This tool combines costs derived from extensive site-specific runs of commercially available remediation cost models with site-specific and estimator-researched and derived costs, providing the best estimating sources available. TRACE also provides for common quantity and key parameter links across multiple alternatives, maximizing ease of updating estimates and performing sensitivity analyses, and ensuring consistency.

  19. Cost reduction ideas for LNG terminals

    SciTech Connect (OSTI)

    Habibullah, A.; Weldin, F.

    1999-07-01T23:59:59.000Z

    LNG projects are highly capital intensive and this has long been regarded as being inevitable. However, recent developments are forcing the LNG industry to aggressively seek cost reductions. For example, the gas-to-liquids (GTL) process is increasingly seen as a potential rival technology and is often being touted as an economically superior alternative fuel source. Another strong driving force behind needed cost reductions is the low crude oil price which seems to have settled in the $10--13/bb. range. LNG is well positioned as the fuel of choice for environmentally friendly new power projects. As a result of the projected demand for power especially in the Pacific Rim countries several LNG terminal projects are under consideration. Such projects will require a new generation of LNG terminal designs emphasizing low cost, small scale and safe and fully integrated designs from LNG supply to power generation. The integration of the LNG terminal with the combined cycle gas turbine (CCGT) power plant offers substantial cost savings opportunities for both plants. Various cost reduction strategies and their impact on the terminal design are discussed including cost reduction due to integration.

  20. Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) – 48" Pipeline Replacing Wisconsin Canal – Preliminary

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    improving the efficiency of pumping plants. The economic water and energy savings analyses provide estimates of the economic costs per acre-foot of water savings and per BTU (kwh) of energy savings associated with one to five proposed capital improvement... limitations. At times, District management’s best educated estimates (or that of the consulting engineer) are used to base cost and/or savings’ values well into the future. Obviously, this is imperfect, but given resource limitations, it is believed ample...

  1. Quantifying capital goods for waste incineration

    SciTech Connect (OSTI)

    Brogaard, L.K., E-mail: lksb@env.dtu.dk [Department of Environmental Engineering, Building 115, Technical University of Denmark, DK-2800 Kongens Lyngby (Denmark); Riber, C. [Ramboll, Consulting Engineers, Hannemanns Allé 53, DK-2300 Copenhagen S (Denmark); Christensen, T.H. [Department of Environmental Engineering, Building 115, Technical University of Denmark, DK-2800 Kongens Lyngby (Denmark)

    2013-06-15T23:59:59.000Z

    Highlights: • Materials and energy used for the construction of waste incinerators were quantified. • The data was collected from five incineration plants in Scandinavia. • Included were six main materials, electronic systems, cables and all transportation. • The capital goods contributed 2–3% compared to the direct emissions impact on GW. - Abstract: Materials and energy used for the construction of modern waste incineration plants were quantified. The data was collected from five incineration plants (72,000–240,000 tonnes per year) built in Scandinavia (Norway, Finland and Denmark) between 2006 and 2012. Concrete for the buildings was the main material used amounting to 19,000–26,000 tonnes per plant. The quantification further included six main materials, electronic systems, cables and all transportation. The energy used for the actual on-site construction of the incinerators was in the range 4000–5000 MW h. In terms of the environmental burden of producing the materials used in the construction, steel for the building and the machinery contributed the most. The material and energy used for the construction corresponded to the emission of 7–14 kg CO{sub 2} per tonne of waste combusted throughout the lifetime of the incineration plant. The assessment showed that, compared to data reported in the literature on direct emissions from the operation of incinerators, the environmental impacts caused by the construction of buildings and machinery (capital goods) could amount to 2–3% with respect to kg CO{sub 2} per tonne of waste combusted.

  2. Summary Report of Summer 2009 NGSI Human Capital Development Efforts at Lawrence Livermore National Laboratory

    SciTech Connect (OSTI)

    Dougan, A; Dreicer, M; Essner, J; Gaffney, A; Reed, J; Williams, R

    2009-11-16T23:59:59.000Z

    In 2009, Lawrence Livermore National Laboratory (LLNL) engaged in several activities to support NA-24's Next Generation Safeguards Initiative (NGSI). This report outlines LLNL's efforts to support Human Capital Development (HCD), one of five key components of NGSI managed by Dunbar Lockwood in the Office of International Regimes and Agreements (NA-243). There were five main LLNL summer safeguards HCD efforts sponsored by NGSI: (1) A joint Monterey Institute of International Studies/Center for Nonproliferation Studies-LLNL International Safeguards Policy and Information Analysis Course; (2) A Summer Safeguards Policy Internship Program at LLNL; (3) A Training in Environmental Sample Analysis for IAEA Safeguards Internship; (4) Safeguards Technology Internships; and (5) A joint LLNL-INL Summer Safeguards Lecture Series. In this report, we provide an overview of these five initiatives, an analysis of lessons learned, an update on the NGSI FY09 post-doc, and an update on students who participated in previous NGSI-sponsored LLNL safeguards HCD efforts.

  3. Updated NGNP Fuel Acquisition Strategy

    SciTech Connect (OSTI)

    David Petti; Tim Abram; Richard Hobbins; Jim Kendall

    2010-12-01T23:59:59.000Z

    A Next Generation Nuclear Plant (NGNP) fuel acquisition strategy was first established in 2007. In that report, a detailed technical assessment of potential fuel vendors for the first core of NGNP was conducted by an independent group of international experts based on input from the three major reactor vendor teams. Part of the assessment included an evaluation of the credibility of each option, along with a cost and schedule to implement each strategy compared with the schedule and throughput needs of the NGNP project. While credible options were identified based on the conditions in place at the time, many changes in the assumptions underlying the strategy and in externalities that have occurred in the interim requiring that the options be re-evaluated. This document presents an update to that strategy based on current capabilities for fuel fabrication as well as fuel performance and qualification testing worldwide. In light of the recent Pebble Bed Modular Reactor (PBMR) project closure, the Advanced Gas Reactor (AGR) fuel development and qualification program needs to support both pebble and prismatic options under the NGNP project. A number of assumptions were established that formed a context for the evaluation. Of these, the most important are: • Based on logistics associated with the on-going engineering design activities, vendor teams would start preliminary design in October 2012 and complete in May 2014. A decision on reactor type will be made following preliminary design, with the decision process assumed to be completed in January 2015. Thus, no fuel decision (pebble or prismatic) will be made in the near term. • Activities necessary for both pebble and prismatic fuel qualification will be conducted in parallel until a fuel form selection is made. As such, process development, fuel fabrication, irradiation, and testing for pebble and prismatic options should not negatively influence each other during the period prior to a decision on reactor type. • Additional funding will be made available beginning in fiscal year (FY) 2012 to support pebble bed fuel fabrication process development and fuel testing while maintaining the prismatic fuel schedule. Options for fuel fabrication for prismatic and pebble bed were evaluated based on the credibility of each option, along with a cost and schedule to implement each strategy. The sole prismatic option is Babcock and Wilcox (B&W) producing uranium oxycarbide (UCO) tristructural-isotropic (TRISO) fuel particles in compacts. This option finishes in the middle of 2022 . Options for the pebble bed are Nuclear Fuel Industries (NFI) in Japan producing uranium dioxide (UO2) TRISO fuel particles, and/or B&W producing UCO or UO2 TRISO fuel particles. All pebble options finish in mid to late 2022.

  4. Economics and Policies for Carbon Capture and Sequestration in the Western United States: A Marginal Cost Analysis of Potential Power Plant Deployment

    E-Print Network [OSTI]

    capital costs. Capacity factors and the impact of carbon prices vary considerably by plant location: A Marginal Cost Analysis of Potential Power Plant Deployment by Gary Shu B.S., Electrical Engineering;Economics and Policies for Carbon Capture and Sequestration in the Western United States: A Marginal Cost

  5. Land-Based Wind Plant Balance-of-System Cost Drivers and Sensitivities (Poster)

    SciTech Connect (OSTI)

    Mone, C.; Maples, B.; Hand, M.

    2014-04-01T23:59:59.000Z

    With Balance of System (BOS) costs contributing up to 30% of the installed capital cost, it is fundamental to understand the BOS costs for wind projects as well as potential cost trends for larger turbines. NREL developed a BOS model using project cost estimates developed by industry partners. Aspects of BOS covered include engineering and permitting, foundations for various wind turbines, transportation, civil work, and electrical arrays. The data introduce new scaling relationships for each BOS component to estimate cost as a function of turbine parameters and size, project parameters and size, and geographic characteristics. Based on the new BOS model, an analysis to understand the non?turbine wind plant costs associated with turbine sizes ranging from 1-6 MW and wind plant sizes ranging from 100-1000 MW has been conducted. This analysis establishes a more robust baseline cost estimate, identifies the largest cost components of wind project BOS, and explores the sensitivity of the capital investment cost and the levelized cost of energy to permutations in each BOS cost element. This presentation shows results from the model that illustrate the potential impact of turbine size and project size on the cost of energy from US wind plants.

  6. UNIT COSTS fot ARMY FACILITIES -MILITARY CONSTRUCTION PAX NEWSLETTER NO. 3.2.2, dated 30 Mar 2006

    E-Print Network [OSTI]

    US Army Corps of Engineers

    ENGLISH UNIT COSTS fot ARMY FACILITIES - MILITARY CONSTRUCTION PAX NEWSLETTER NO. 3.2.2, dated 30 Mar 2006 1. APPENDIX A - FACILITY UNIT COST TABLE (FOR FY08 and later MILCON, BRAC, IGPBS Projects Newsletter No. 3.2.2, 15 March 2005, and updates the Appendix A, Facility Unit Cost Table, Appendix C, Tri

  7. APPROVED MINORS Updated on April 4, 2013

    E-Print Network [OSTI]

    New Hampshire, University of

    APPROVED MINORS Updated on April 4, 2013 Note: Please go to Department webpages for updates. Page 1;APPROVED MINORS Updated on April 4, 2013 Note: Please go to Department webpages for updates. Page 2 COLLEGE Studies Cinema Studies Classics Communication Dance Education English European Cultural Studies Forensics

  8. Economic and Conservation Evaluation of Capital Renovation Project: Hidalgo County Irrigation District No. 2 (San Juan) - Relining Lateral A – Preliminary

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    the efficiency of pumping plants. The economic water and energy savings analyses provide estimates of the economic costs per acre-foot of water savings and per BTU (kwh) of energy savings associated with one to five proposed capital improvement activity... at the time and is subject to an array of resource limitations. At times, District management’s best educated estimates (or that of the consulting engineer) are used to base cost and/or savings’ values well into the future. Obviously, this is imperfect...

  9. Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 48" Pipeline Replacing Main Canal – Final

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    analyses provide estimates of the economic costs per acre-foot of water savings and per BTU (kwh) of energy savings associated with one to five proposed capital improvement activity(ies) (each referred to as a component). An aggregate assessment is also.... At times, District management’s best educated estimates (or that of the consulting engineer) are used to base cost and/or savings’ values well into the future. Obviously, this is imperfect, but given resource limitations, it is believed ample inquiry...

  10. Does imperfect competition foster capital accumulation in a developing economy ?

    E-Print Network [OSTI]

    Boyer, Edmond

    Does imperfect competition foster capital accumulation in a developing economy ? Pascal Belan competition and capital accumulation in a dual economy, with traditional and modern sectors and two types. Capitalists accumulate wealth in the modern sector. The economy is open to cap- ital flows, but capitalists

  11. A Two State Capital Asset Pricing Model Moshe Fridman

    E-Print Network [OSTI]

    as Hidden Markov Models (HMM). We apply the model to monthly return data for three oil industry corporation expected returns on capital assets investments with ex- pected market returns. Under the model, the returnA Two State Capital Asset Pricing Model Moshe Fridman Institute for Mathematics and its

  12. IEAB Invasive Mussels Update September 2013 Invasive Mussels Update

    E-Print Network [OSTI]

    ....................................................... 16 8. Update on Mussel Control Agents Area MFWP Montana Fish Wildlife and Parks NASQAN National Stream Quality Accounting Network NGO Non, respectively, during 2012. A total of 109 mussel-infested boats were found during

  13. SOLID OXIDE FUEL CELL MANUFACTURING COST MODEL: SIMULATING RELATIONSHIPS BETWEEN PERFORMANCE, MANUFACTURING, AND COST OF PRODUCTION

    SciTech Connect (OSTI)

    Eric J. Carlson; Yong Yang; Chandler Fulton

    2004-04-20T23:59:59.000Z

    The successful commercialization of fuel cells will depend on the achievement of competitive system costs and efficiencies. System cost directly impacts the capital equipment component of cost of electricity (COE) and is a major contributor to the O and M component. The replacement costs for equipment (also heavily influenced by stack life) is generally a major contributor to O and M costs. In this project, they worked with the SECA industrial teams to estimate the impact of general manufacturing issues of interest on stack cost using an activities-based cost model for anode-supported planar SOFC stacks with metallic interconnects. An earlier model developed for NETL for anode supported planar SOFCs was enhanced by a linkage to a performance/thermal/mechanical model, by addition of Quality Control steps to the process flow with specific characterization methods, and by assessment of economies of scale. The 3-dimensional adiabatic performance model was used to calculate the average power density for the assumed geometry and operating conditions (i.e., inlet and exhaust temperatures, utilization, and fuel composition) based on publicly available polarizations curves. The SECA team provided guidance on what manufacturing and design issues should be assessed in this Phase I demonstration of cost modeling capabilities. They considered the impact of the following parameters on yield and cost: layer thickness (i.e., anode, electrolyte, and cathode) on cost and stress levels, statistical nature of ceramic material failure on yield, and Quality Control steps and strategies. In this demonstration of the capabilities of the linked model, only the active stack (i.e., anode, electrolyte, and cathode) and interconnect materials were included in the analysis. Factory costs are presented on an area and kilowatt basis to allow developers to extrapolate to their level of performance, stack design, materials, seal and system configurations, and internal corporate overheads and margin goals.

  14. Oil shale mining cost analysis. Volume I. Surface retorting process. Final report

    SciTech Connect (OSTI)

    Resnick, B.S.; English, L.M.; Metz, R.D.; Lewis, A.G.

    1981-01-01T23:59:59.000Z

    An Oil Shale Mining Economic Model (OSMEM) was developed and executed for mining scenarios representative of commercially feasible mining operations. Mining systems were evaluated for candidate sites in the Piceance Creek Basin. Mining methods selected included: (1) room-and-pillar; (2) chamber-and-pillar, with spent shale backfilling; (3) sublevel stopping; and (4) sublevel stopping, with spent shale backfilling. Mines were designed to extract oil shale resources to support a 50,000 barrels-per-day surface processing facility. Costs developed for each mining scenario included all capital and operating expenses associated with the underground mining methods. Parametric and sensitivity analyses were performed to determine the sensitivity of mining cost to changes in capital cost, operating cost, return on investment, and cost escalation.

  15. At what cost do we reduce pollution Shadow prices of SO[sub 2] emissions

    SciTech Connect (OSTI)

    Swinton, J.R. (Univ. of South Florida, Tampa, FL (United States))

    1998-01-01T23:59:59.000Z

    The US EPA's infant market for SO[sub 2] emissions has the potential for improving the cost effectiveness of reducing acid rain pollutants. If the market works as planned, over time one should see the cost of reducing additional amounts of sulfur dioxide converge across plants. The results of the study described here demonstrate that before the market opened marginal abatement costs varied wildly across plants. This work provides estimates of the shadow price of SO[sub 2] abatement using the output distance function approach for Illinois, Minnesota and Wisconsin coal-burning electric plants. The results demonstrate that the coal-burning electric plants with the highest emissions rates are also the plants with the lowest marginal abatement costs, a fact that may explain lower-than-expected prices in the new market for allowances. The data include information about plants with installed scrubber capital allowing for an investigation of the effect of scrubber capital on marginal abatement costs.

  16. Cost and U.S. public policy for new coal power plants with carbon capture and sequestration

    E-Print Network [OSTI]

    Hamilton, Michael R.

    This paper provides a financial analysis for new supercritical pulverized coal plants with carbon capture and sequestration (CCS) that compares the effects of two relevant climate policies. First, an updated cost estimate ...

  17. Fermilab D-0 Experimental Facility: Energy conservation report and mechanical systems design optimization and cost analysis study

    SciTech Connect (OSTI)

    Krstulovich, S.F.

    1987-10-31T23:59:59.000Z

    This report is developed as part of the Fermilab D-0 Experimental Facility Project Title II Design Documentation Update. As such, it concentrates primarily on HVAC mechanical systems design optimization and cost analysis.

  18. Life-cycle cost comparisons of advanced storage batteries and fuel cells for utility, stand-alone, and electric vehicle applications

    SciTech Connect (OSTI)

    Humphreys, K.K.; Brown, D.R.

    1990-01-01T23:59:59.000Z

    This report presents a comparison of battery and fuel cell economics for ten different technologies. To develop an equitable economic comparison, the technologies were evaluated on a life-cycle cost (LCC) basis. The LCC comparison involved normalizing source estimates to a standard set of assumptions and preparing a lifetime cost scenario for each technology, including the initial capital cost, replacement costs, operating and maintenance (O M) costs, auxiliary energy costs, costs due to system inefficiencies, the cost of energy stored, and salvage costs or credits. By considering all the costs associated with each technology over its respective lifetime, the technology that is most economical to operate over any given period of time can be determined. An analysis of this type indicates whether paying a high initial capital cost for a technology with low O M costs is more or less economical on a lifetime basis than purchasing a technology with a low initial capital cost and high O M costs. It is important to realize that while minimizing cost is important, the customer will not always purchase the least expensive technology. The customer may identify benefits associated with a more expensive option that make it the more attractive over all (e.g., reduced construction lead times, modularity, environmental benefits, spinning reserve, etc.). The LCC estimates presented in this report represent three end-use applications: utility load-leveling, stand-alone power systems, and electric vehicles.

  19. Zevenhoven & Kilpinen SULPHUR 13.6.2001 3-24 3.10 Costs related to FGD

    E-Print Network [OSTI]

    Laughlin, Robert B.

    combustion One of the great benefits of fluidised bed combustion (FBC, 7 Chapter 2) is the option of in of any of the above-mentioned FGD processes can be broken down into fixed and variable operation & maintenance (O & M) costs and fixed capital charge costs (see e.g. Coulson and Richardson, 1993). For a few

  20. Integration of Variable Generation and Cost-Causation (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-09-01T23:59:59.000Z

    Variable renewable energy generation sources, such as wind and solar energy, provide benefits such as reduced environmental impact, zero fuel consumption, and low and stable costs. Advances in both technologies can reduce capital costs and provide significant control capabilities. However, their variability and uncertainty - which change with weather conditions, time of day, and season - can cause an increase in power system operating costs compared to a fully controllable power plant. Although a number of studies have assessed integration costs, calculating them correctly is challenging because it is difficult to accurately develop a baseline scenario without variable generation that properly accounts for the energy value. It is also difficult to appropriately allocate costs given the complex, nonlinear interactions between resources and loads.

  1. Geothermal completion technology life-cycle cost model (GEOCOM)

    SciTech Connect (OSTI)

    Mansure, A.J.; Carson, C.C.

    1982-01-01T23:59:59.000Z

    GEOCOM is a model developed to evaluate the cost effectiveness of alternative technologies used in the completion, production, and maintenance of geothermal wells. The model calculates the ratio of life-cycle cost to life-cycle production or injection and thus is appropriate for evaluating the cost effectiveness of a geothermal well even when the most economically profitable well completion strategies do not result in lowest capital costs. The project to develop the GEOCOM model included the establishment of a data base for studying geothermal completions and preliminary case/sensitivity studies. The code has the data base built into its structure as default parameters. These parameters include geothermal resource characteristics; costs of geothermal wells, workovers, and equipment; and other data. The GEOCOM model has been written in ANSI (American National Standard Institute) FORTRAN 1966 version.

  2. Cost Model and Cost Estimating Software

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    This chapter discusses a formalized methodology is basically a cost model, which forms the basis for estimating software.

  3. Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for

    E-Print Network [OSTI]

    1 Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for Transportation (2012), annually updated costs analyses will be conducted for PEM fuel cell passenger buses as well to eliminate the need for oil in the transportation sector. Fuel cell vehicles can operate on hydrogen, which

  4. US nuclear power plant operating cost and experience summaries

    SciTech Connect (OSTI)

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01T23:59:59.000Z

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov).

  5. Cost of a Ride: The Effects of Densities on Fixed-Guideway Transit Ridership and Capital Costs

    E-Print Network [OSTI]

    Guerra, Erick; Cervero, Robert

    2010-01-01T23:59:59.000Z

    35(9), 823–845. Booz Allen Hamilton, Inc. (2003). Light railAdministration. Booz Allen Hamilton, Inc. (2005). ManagingPickrell study, by Booz Allen Hamilton (2003), analyzed the

  6. FUPWG Fall 2009 Washington Update | Department of Energy

    Office of Environmental Management (EM)

    FUPWG Fall 2009 Washington Update FUPWG Fall 2009 Washington Update Presentation covers the 2009 Federal Utility Partnership Working Group (FUPWG) Washington update to the Lighting...

  7. Sign Up For Email Updates

    Broader source: Energy.gov [DOE]

    Be the first to know of the latest developments from the Energy.gov team -- from videos to infographics to live Q&A’s -- by signing up for email updates.

  8. Gearbox Reliability Collaborative Update (Presentation)

    SciTech Connect (OSTI)

    Sheng, S.

    2013-10-01T23:59:59.000Z

    This presentation was given at the Sandia Reliability Workshop in August 2013 and provides information on current statistics, a status update, next steps, and other reliability research and development activities related to the Gearbox Reliability Collaborative.

  9. BPA Wind Integration Team Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BPA Wind Integration Team Update Customer Supplied Generation Imbalance (CSGI) Pilot Transmission Services Customer Forum 29 July 28, 2010 B O N N E V I L L E P O W E R A D M I N...

  10. Agricultural and Resource Economics Update

    E-Print Network [OSTI]

    2012-01-01T23:59:59.000Z

    corn prices, but crude oil prices are also relatively highSmith. “What is the Price of Oil? ” ARE Update 11(5) (2008):ates with the prices of corn and crude oil. Until 2011 there

  11. UPDATING CONSTRAINT PRECONDITIONERS FOR KKT ...

    E-Print Network [OSTI]

    2015-03-23T23:59:59.000Z

    nevertheless, their computation may be very expensive for large-scale problems and resorting to ... updating procedure is expected to build a preconditioner which is less effective in terms of linear iterations than ..... We consider a low-rank up-.

  12. Progress Update: M Area Closure

    ScienceCinema (OSTI)

    Cody, Tom

    2012-06-14T23:59:59.000Z

    A progress update of the Recovery Act at work at the Savannah River Site. The celebration of the first area cleanup completion with the help of the Recovery Act.

  13. Ksplice: Automatic Rebootless Kernel Updates

    E-Print Network [OSTI]

    Kaashoek, M. Frans

    2009-01-01T23:59:59.000Z

    Ksplice allows system administrators to apply patches to their operating system kernels without rebooting. Unlike previous hot update systems, Ksplice operates at the object code layer, which allows Ksplice to transform ...

  14. Activity Based Costing

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    Activity Based Costing (ABC) is method for developing cost estimates in which the project is subdivided into discrete, quantifiable activities or a work unit. This chapter outlines the Activity Based Costing method and discusses applicable uses of ABC.

  15. Sharing Supermodular Costs

    E-Print Network [OSTI]

    2010-06-23T23:59:59.000Z

    For a particular class of supermodular cost cooperative games that arises from a scheduling ... the costs collectively incurred by a group of cooperating agents.

  16. Operations Cost Allocation Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Consolidation Project Operations Consolidation Project (OCP) Cost Allocation Presentation - September 20, 2011 OCP Cost Allocation Customer Presentation List of Acronyms...

  17. Quick Estimate of IRR From Capital Estimate Ratios 

    E-Print Network [OSTI]

    Larson, R. J.

    1985-01-01T23:59:59.000Z

    Value of a unit of capital = $821 / $1000 of capital Table III Net Present Value of a Unit of Revenue (or Savings; unit is $1000) TilDe year 0 1 2 3 4 5 6 Cash Flow (after $ 0 520 562 606 655 707 764 Taxes) Discounted Cash $ 0 452 425 399 375... proposes to invest $3500 to achieve SaVings of $1300 (b.t) in the first year of operation, economically attractive? Evaluations Criteria: Investment Equivalent of $1 of Savings $2.84. Solution: Maximum Capital allowed; $1300' $2.84 = $3 Since...

  18. Updating Technical Screens for PV Interconnection: Preprint

    SciTech Connect (OSTI)

    Coddington, M.; Ellis, A.; Lynn, K.; Razon, A.; Key, T.; Kroposki, B.; Mather, B.; Hill, R.; Nicole, K.; Smith, J.

    2012-08-01T23:59:59.000Z

    Solar photovoltaics (PV) is the dominant type of distributed generation (DG) technology interconnected to electric distribution systems in the United States, and deployment of PV systems continues to increase rapidly. Considering the rapid growth and widespread deployment of PV systems in United States electric distribution grids, it is important that interconnection procedures be as streamlined as possible to avoid unnecessary interconnection studies, costs, and delays. Because many PV interconnection applications involve high penetration scenarios, the process needs to allow for a sufficiently rigorous technical evaluation to identify and address possible system impacts. Existing interconnection procedures are designed to balance the need for efficiency and technical rigor for all DG. However, there is an implicit expectation that those procedures will be updated over time in order to remain relevant with respect to evolving standards, technology, and practical experience. Modifications to interconnection screens and procedures must focus on maintaining or improving safety and reliability, as well as accurately allocating costs and improving expediency of the interconnection process. This paper evaluates the origins and usefulness of the capacity penetration screen, offers potential short-term solutions which could effectively allow fast-track interconnection to many PV system applications, and considers longer-term solutions for increasing PV deployment levels in a safe and reliable manner while reducing or eliminating the emphasis on the penetration screen.

  19. Valuing Rail Transit: Comparing Capital and Operating Costs to Consumer Benefits

    E-Print Network [OSTI]

    Guerra, Erick

    2010-01-01T23:59:59.000Z

    of Allegheny County Tri-County Metropolitan Transportationof Allegheny County Tri-County Metropolitan Transportationof Allegheny County Tri-County Metropolitan Transportation

  20. Wind Turbine Control Design to Reduce Capital Costs: 7 January 2009 - 31 August 2009

    SciTech Connect (OSTI)

    Darrow, P. J.

    2010-01-01T23:59:59.000Z

    This report first discusses and identifies which wind turbine components can benefit from advanced control algorithms and also presents results from a preliminary loads case analysis using a baseline controller. Next, it describes the design, implementation, and simulation-based testing of an advanced controller to reduce loads on those components. The case-by-case loads analysis and advanced controller design will help guide future control research.

  1. Geothermal Heat Pumps as a Cost Saving and Capital Renewal Too!

    SciTech Connect (OSTI)

    Hughes, P.J.

    1998-11-06T23:59:59.000Z

    An independent evaluation of the Fort Polk, Louisiana energy savings performance contract (ESPC) has verified the financial value of geothermal heat pump (GHP)-centered ESPCS to the federal government. The Department of Energy (DOE) Federal Energy Management Program (FEMP) has responded by issuing an RFP for the "National GHP-Technology-Specific Super ESPC Procurement." Federal agency sites anywhere in the nation will be able to implement GHP-centered ESPC projects as delivery orders against the awarded contracts.

  2. Best Practices for Controlling Capital Costs in Net Zero Energy Design and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The FutureCommentsEnergy Christopher| Departmentofof Energy

  3. Best Practices for Controlling Capital Costs in Net Zero Energy Design and

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T, Inc.'s ReplyApplicationCommittee | Department ofBerkeley Lab:

  4. Portfolio of Tools, Faculty Pay-Merit Paradigm (updated August 2012) Type of Faculty

    E-Print Network [OSTI]

    Sheridan, Jennifer

    Portfolio of Tools, Faculty Pay-Merit Paradigm (updated August 2012) Type of Faculty Salary-tenure review). This tool contrasts with "standard" equity (see other side). Cost-share: Central campus pays up. Rolling horizon of implementation; local units drive process. TBD: HR Redesign tools; periodicity of CCF

  5. Cost Estimation Package

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    This chapter focuses on the components (or elements) of the cost estimation package and their documentation.

  6. Life Cycle Cost Estimate

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    Life-cycle costs (LCCs) are all the anticipated costs associated with a project or program alternative throughout its life. This includes costs from pre-operations through operations or to the end of the alternative.This chapter discusses life cycle costs and the role they play in planning.

  7. Environmental Cost Analysis

    E-Print Network [OSTI]

    Edge, D.

    Period ... Varies for company to company ... 2 years is a rule of thumb Net Present Value (AmtuaI Gmt Flow), NPV= Lito.) (l+diimmttnter e subtnJct capitIII b" arJb fPv eD=years 133 ESL-IE-00-04-21 Proceedings from the Twenty-second National...

  8. NEMA Distribution Transformers, CCE Overview and Update presentation...

    Broader source: Energy.gov (indexed) [DOE]

    Distribution Transformers, CCE Overview and Update presentation, dated 05242011 NEMA Distribution Transformers, CCE Overview and Update presentation, dated 05242011 This...

  9. CALIFORNIA INSTITUTE OF TECHNOLOGY CAPITAL CONSTRUCTION POLICY

    E-Print Network [OSTI]

    Goddard III, William A.

    construction, significant building exterior or landscape modifications, and major renovation projects. No new as the construction of a new building or facility at Caltech for which the total cost exceeds $3 million. "Building renovation" is defined as an upgrade to a building or facility that; materially increases the estimated

  10. Bureau of mines cost estimating system handbook (in two parts). 1. Surface and underground mining

    SciTech Connect (OSTI)

    Not Available

    1987-01-01T23:59:59.000Z

    The handbook provides a convenient costing procedure based on the summation of the costs for unit processes required in any particular mining or mineral processing operation. The costing handbook consists of a series of costing sections, each corresponding to a specific mining unit process. Contained within each section is the methodology to estimate either the capital or operating cost for that unit process. The unit process sections may be used to generate, in January 1984 dollars, costs through the use of either costing curves or formulae representing the prevailing technology. Coverage for surface mining includes dredging, quarrying, strip mining, and open pit mining. The underground mining includes individual development sections for drifting, raising, shaft sinking, stope development, various mining methods, underground mine haulage, general plant, and underground mine administrative cost.

  11. Corporate intellectual capital reporting: the case of Germany 

    E-Print Network [OSTI]

    Zerr, Viktoria

    2013-11-26T23:59:59.000Z

    This study investigates potential motivations for intellectual capital (IC) reporting in management reports of 428 German companies for the accounting year 2010. To infer motivations, agency theory and legitimacy theory ...

  12. Webinar Announcement: Accessing Private Capital for Clean Energy...

    Open Energy Info (EERE)

    2012 - 10:44 On November 19th, the Clean Energy Solutions Center will host a training webinar on Financing Clean Energy Projects with Private Capital. The webinar content...

  13. Small Business Venture Capital Tax Credit Program (Manitoba, Canada)

    Broader source: Energy.gov [DOE]

    The Small Business Venture Capital Tax Credit Program (SBVCTC) assists eligible small corporations to issue new equity to primarily new investors. The small corporation will be able to issue from ...

  14. Tenant-in-common capital in value added transactions

    E-Print Network [OSTI]

    Smith, Jared Steven

    2005-01-01T23:59:59.000Z

    Billions of dollars of equity is flowing into the emerging tenant-in-common (TIC) market, forcing demand for such investments to outweigh the current supply of TIC offerings. Investors seeking deferral of capital gains are ...

  15. Essays on the real and financial allocation of capital

    E-Print Network [OSTI]

    Ramírez Verdugo, Arturo

    2006-01-01T23:59:59.000Z

    This dissertation consists of three papers studying how firms allocate real and financial capital, and how taxes, the labor market and asymmetric information affect these allocation decisions. The first paper studies the ...

  16. What Matters for Financial Development? Capital Controls, Institutions, and Interactions

    E-Print Network [OSTI]

    Chinn, Menzie David; Ito, Hiro

    2005-01-01T23:59:59.000Z

    Bureaucracy Quality) FULL, LDC, and EMG: Five year panels,Mkt Turnover Private Credit LDC Stock Mkt Capital'n StockTransactions) FULL, LDC, and EMG: Five year panels, 1980-

  17. 15.391 Early Stage Capital, Fall 2003

    E-Print Network [OSTI]

    Loessberg, Shari

    15.391 examines the elements of raising early stage capital, focusing on start-up ventures and the early stages of company development. This course also prepares entrepreneurs to make the best use of outside advisors, and ...

  18. Lasting social impact : Community Development Venture Capital investing

    E-Print Network [OSTI]

    Silberberg, Hattie Paige

    2008-01-01T23:59:59.000Z

    Community Development Venture Capital Funds (CDVC) funds are an emerging group of Community Development Financial Institutions, that make equity investments in businesses in economically distressed areas. As equity investors, ...

  19. EMAB Briefing on Capital Assets Projects and Operations Activities...

    Office of Environmental Management (EM)

    www.em.doe.gov 5 * Capital asset projects with funding at over 10 M: Richland, Savannah River Site, Portsmouth, Paducah, Oak Ridge, Idaho National Laboratory, Los Alamos National...

  20. UNITED STATES AIR FORCE OUTSIDE THE NATIONAL CAPITAL REGION

    E-Print Network [OSTI]

    program in order to reduce Federal employee's contribution to traffic congestion and air pollutionUNITED STATES AIR FORCE OUTSIDE THE NATIONAL CAPITAL REGION PUBLIC TRANSPORTATION BENEFIT PROGRAM): ____________ City (Residence): __________________________State: _______________ Zip Code: ________________ Air Force

  1. Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-03-28T23:59:59.000Z

    The purpose of this Manual is to provide requirements and guidance to Department of Energy (DOE) employees, including National Nuclear Security Administration (NNSA) employees on the planning and acquisition of capital assets. Does not cancel other directives.

  2. Federal Aviation Administration's Airport Capital Improvement Program Development Process

    E-Print Network [OSTI]

    Tener, Scott D.

    2009-12-18T23:59:59.000Z

    The Airport Capital Improvement Program (ACIP) serves as the primary tool for project planning and formulation by the Federal Aviation Administration (FAA). The FAA relies on the ACIP to serve as the basis for the distribution of Aviation Trust...

  3. DROWNED AND DAMMED Colonial Capitalism and Flood Control

    E-Print Network [OSTI]

    Sussex, University of

    DROWNED AND DAMMED Colonial Capitalism and Flood Control in Eastern India ROHAN D, Jawaharlal Nehru University, New Delhi. Drowned and Dammed comprehensively reconsiders the debate with physical infrastructure such as embankments, canal networks, and inevitably the Hirakud Dam. In seeking

  4. Job Maintenance and Capital Development Fund (North Carolina)

    Broader source: Energy.gov [DOE]

    The Job Maintenance and Capital Development Fund provides annual grants to businesses which are located in Development Tier I counties. The Fund is intended to encourage the retention of...

  5. Capital Taxation: Quantitative Explorations of the Inverse Euler Equation

    E-Print Network [OSTI]

    Farhi, Emmanuel

    Economies with private information provide a rationale for capital taxation. In this paper we ask what the welfare gains from following this prescription are. We develop a method to answer this question in standard general ...

  6. Women in engineering conference: capitalizing on today`s challenges

    SciTech Connect (OSTI)

    Metz, S.S.; Martins, S.M. [eds.] [eds.

    1996-06-01T23:59:59.000Z

    This document contains the conference proceedings of the Women in Engineering Conference: Capitalizing on Today`s Challenges, held June 1-4, 1996 in Denver, Colorado. Topics included engineering and science education, career paths, workplace issues, and affirmative action.

  7. OOTW COST TOOLS

    SciTech Connect (OSTI)

    HARTLEY, D.S.III; PACKARD, S.L.

    1998-09-01T23:59:59.000Z

    This document reports the results of a study of cost tools to support the analysis of Operations Other Than War (OOTW). It recommends the continued development of the Department of Defense (DoD) Contingency Operational Support Tool (COST) as the basic cost analysis tool for 00TWS. It also recommends modifications to be included in future versions of COST and the development of an 00TW mission planning tool to supply valid input for costing.

  8. Reducing biosolids disposal costs using land application in forested areas

    SciTech Connect (OSTI)

    Huffines, R.L.

    1995-11-01T23:59:59.000Z

    Switching biosolids land application from a reclamation site to a forested site significantly reduced the cost of biosolids disposal at the Savannah River Site. Previous beneficial reuse programs focused on reclamation of existing borrow pits. While extremely beneficial, this program became very costly due to the regulatory requirements for groundwater monitoring, soil monitoring and frequent biosolids analyses. A new program was developed to reuse biosolids in forested areas where the biosolids could be used as a soil conditioner and fertilizer to enhance timber yield. The forested land application site was designed so that groundwater monitoring and soil monitoring could be eliminated while biosolids monitoring and site maintenance were minimized. Monitoring costs alone were reduced by 80%. Capital costs for site preparation were also significantly reduced since there was no longer a need for expensive groundwater monitoring wells.

  9. Hydrogen refueling station costs in Shanghai

    E-Print Network [OSTI]

    Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

    2007-01-01T23:59:59.000Z

    Elec Del Cali: Del Investment Cost Delivery Cost OperatingCost Feedstock Cost Investment Cost Delivery Cost Operatingcosts Annualized investment cost, 1000$/yr Total annualized

  10. Development of Advanced Technologies to Reduce Design, Fabrication and Construction Costs for Future Nuclear Power Plants

    SciTech Connect (OSTI)

    Camillo A. DiNunzio Framatome ANP DE& S; Dr. Abhinav Gupta Assistant Professor NCSU; Dr. Michael Golay Professor MIT Dr. Vincent Luk Sandia National Laboratories; Rich Turk Westinghouse Electric Company Nuclear Systems; Charles Morrow, Sandia National Laboratories; Geum-Taek Jin, Korea Power Engineering Company Inc.

    2002-11-30T23:59:59.000Z

    OAK-B135 This report presents a summation of the third and final year of a three-year investigation into methods and technologies for substantially reducing the capital costs and total schedule for future nuclear plants. In addition, this is the final technical report for the three-year period of studies.

  11. Energy Storage Systems 2010 Update Conference Presentations ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Energy Storage Systems 2010 Update Conference Presentations - Day 1, Session 4 The U.S. DOE Energy Storage Systems Program (ESS) conducted a record-breaking Update Conference at...

  12. Energy Storage Systems 2010 Update Conference Presentations ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Energy Storage Systems 2010 Update Conference Presentations - Day 2, Session 3 The U.S. DOE Energy Storage Systems Program (ESS) conducted a record-breaking Update Conference at...

  13. Energy Storage Systems 2010 Update Conference Presentations ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Energy Storage Systems 2010 Update Conference Presentations - Day 3, Session 2 The U.S. DOE Energy Storage Systems Program (ESS) conducted a record-breaking Update Conference at...

  14. Energy Storage Systems 2010 Update Conference Presentations ...

    Office of Environmental Management (EM)

    1 Energy Storage Systems 2010 Update Conference Presentations - Day 3, Session 1 The U.S. DOE Energy Storage Systems Program (ESS) conducted a record-breaking Update Conference at...

  15. Energy Storage Systems 2010 Update Conference Presentations ...

    Office of Environmental Management (EM)

    2 Energy Storage Systems 2010 Update Conference Presentations - Day 2, Session 2 The U.S. DOE Energy Storage Systems Program (ESS) conducted a record-breaking Update Conference at...

  16. Energy Storage Systems 2010 Update Conference Presentations ...

    Office of Environmental Management (EM)

    2 Energy Storage Systems 2010 Update Conference Presentations - Day 1, Session 2 The U.S. DOE Energy Storage Systems Program (ESS) conducted a record-breaking Update Conference at...

  17. Energy Storage Systems 2010 Update Conference Presentations ...

    Office of Environmental Management (EM)

    3 Energy Storage Systems 2010 Update Conference Presentations - Day 3, Session 3 The U.S. DOE Energy Storage Systems Program (ESS) conducted a record-breaking Update Conference at...

  18. Energy Storage Systems 2010 Update Conference Presentations ...

    Broader source: Energy.gov (indexed) [DOE]

    chaired by DOE's Imre Gyuk, are below. ESS 2010 Update Conference - UltraBattery Grid Storage - John Wood, Ecoult.pdf ESS 2010 Update Conference - PV Plus Storage for Simultaneous...

  19. Energy Storage Systems 2010 Update Conference Presentations ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Energy Storage Systems 2010 Update Conference Presentations - Day 1, Session 3 The U.S. DOE Energy Storage Systems Program (ESS) conducted a record-breaking Update Conference at...

  20. Catalog Update 2006 International Education Abroad 1

    E-Print Network [OSTI]

    Gering, Jon C.

    Catalog Update 2006 International Education Abroad 1 INTERNATIONAL EDUCATION ABROAD 2005-2007 CATALOG UPDATE Changes effective 2006-2007 New Courses CHN 310 China Summer Study Abroad Program 6-7 hours

  1. Baton Rouge Metropolitan Transportation Plan Update

    E-Print Network [OSTI]

    Capital Region Planning Commission

    (028) SUBMITTED TO: LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT SUBMITTED BY: IN ASSOCIATION WITH: & FINAL Metropolitan Transportation Plan Update Baton Rouge, LA... ............................189? X. APPENDIX .........................................................................................................................195? ? Metropolitan Transportation Plan Update...

  2. DSO216_Phase_II_Summary_Updates

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Summary of DSO 216 - Phase II Update Limiting Wind Output to Scheduled Value and Curtailing Schedules to Actual Wind Generation Updated: December 13, 2013 I. PURPOSE The purpose of...

  3. Low-Cost High-Pressure Hydrogen Generator

    SciTech Connect (OSTI)

    Cropley, Cecelia C.; Norman, Timothy J.

    2008-04-02T23:59:59.000Z

    Electrolysis of water, particularly in conjunction with renewable energy sources, is potentially a cost-effective and environmentally friendly method of producing hydrogen at dispersed forecourt sites, such as automotive fueling stations. The primary feedstock for an electrolyzer is electricity, which could be produced by renewable sources such as wind or solar that do not produce carbon dioxide or other greenhouse gas emissions. However, state-of-the-art electrolyzer systems are not economically competitive for forecourt hydrogen production due to their high capital and operating costs, particularly the cost of the electricity used by the electrolyzer stack. In this project, Giner Electrochemical Systems, LLC (GES) developed a low cost, high efficiency proton-exchange membrane (PEM) electrolysis system for hydrogen production at moderate pressure (300 to 400 psig). The electrolyzer stack operates at differential pressure, with hydrogen produced at moderate pressure while oxygen is evolved at near-atmospheric pressure, reducing the cost of the water feed and oxygen handling subsystems. The project included basic research on catalysts and membranes to improve the efficiency of the electrolysis reaction as well as development of advanced materials and component fabrication methods to reduce the capital cost of the electrolyzer stack and system. The project culminated in delivery of a prototype electrolyzer module to the National Renewable Energy Laboratory for testing at the National Wind Technology Center. Electrolysis cell efficiency of 72% (based on the lower heating value of hydrogen) was demonstrated using an advanced high-strength membrane developed in this project. This membrane would enable the electrolyzer system to exceed the DOE 2012 efficiency target of 69%. GES significantly reduced the capital cost of a PEM electrolyzer stack through development of low cost components and fabrication methods, including a 60% reduction in stack parts count. Economic analysis indicates that hydrogen could be produced for $3.79 per gge at an electricity cost of $0.05/kWh by the lower-cost PEM electrolyzer developed in this project, assuming high-volume production of large-scale electrolyzer systems.

  4. PEM Electrolyzer Incorporating an Advanced Low-Cost Membrane

    SciTech Connect (OSTI)

    Hamdan, Monjid [Giner, Inc.] [Giner, Inc.

    2013-08-29T23:59:59.000Z

    The Department of Energy (DOE) has identified hydrogen production by electrolysis of water at forecourt stations as a critical technology for transition to the hydrogen economy; however, the cost of hydrogen produced by present commercially available electrolysis systems is considerably higher than the DOE 2015 and 2020 cost targets. Analyses of proton-exchange membrane (PEM) electrolyzer systems indicate that reductions in electricity consumption and electrolyzer stack and system capital cost are required to meet the DOE cost targets. The primary objective is to develop and demonstrate a cost-effective energy-based system for electrolytic generation of hydrogen. The goal is to increase PEM electrolyzer efficiency and to reduce electrolyzer stack and system capital cost to meet the DOE cost targets for distributed electrolysis. To accomplish this objective, work was conducted by a team consisting of Giner, Inc. (Giner), Virginia Polytechnic Institute & University (VT), and domnick hunter group, a subsidiary of Parker Hannifin (Parker). The project focused on four (4) key areas: (1) development of a high-efficiency, high-strength membrane; (2) development of a long-life cell-separator; (3) scale-up of cell active area to 290 cm2 (from 160 cm˛); and (4) development of a prototype commercial electrolyzer system. In each of the key stack development areas Giner and our team members conducted focused development in laboratory-scale hardware, with analytical support as necessary, followed by life-testing of the most promising candidate materials. Selected components were then scaled up and incorporated into low-cost scaled-up stack hardware. The project culminated in the fabrication and testing of a highly efficient electrolyzer system for production of 0.5 kg/hr hydrogen and validation of the stack and system in testing at the National Renewable Energy Laboratory (NREL).

  5. Updated 17 March 2012 Curriculum Vitae

    E-Print Network [OSTI]

    Richardson, David

    and Bioeconomy, 2011 Member, AAAS Committee on Science, Engineering and Public Policy, 2011-2014 #12;Updated 17

  6. ECONOMICS UPDATE Issue 1 Autumn 2014

    E-Print Network [OSTI]

    Levi, Ran

    ECONOMICS UPDATE Issue 1 Economics Update Autumn 2014 UNIVERSITY OF ABERDEEN ­ DEPARTMENT OF ECONOMICS IN THIS ISSUE Welcome to the first Economics update! In this twice-yearly publication, we. In the Research Assessment Exercise results of 2008, 100% of Economics research, was judged to be of international

  7. Catalog Update 2006 Math & Computer Science 1

    E-Print Network [OSTI]

    Gering, Jon C.

    Catalog Update 2006 Math & Computer Science 1 MATH AND COMPUTER SCIENCE DIVISION 2005-2007 CATALOG UPDATE Changes effective 2006-2007 Degree Update COMPUTER SCIENCE BACHELOR OF SCIENCE Semester Hours CS 100 Computer Science Seminar.........................1 CS 180 Foundations of Computer Science I

  8. Microsoft PowerPoint - Triay - EM Program Update

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_Cost Estimating Panel MicrosoftSeptember 15, September T I A liUpdate

  9. Non-PGM Target Update

    Broader source: Energy.gov (indexed) [DOE]

    targets that need to be met are cost, efficiency, and durability. A secondary target is heat rejection at rated power. (ANL) * Given that for current Pt systems catalyst cost is ...

  10. Non-Hardware ("Soft") Cost-Reduction Roadmap for Residential and Small Commercial Solar Photovoltaics, 2013-2020

    SciTech Connect (OSTI)

    Ardani, K.; Seif, D.; Margolis, R.; Morris, J.; Davidson, C.; Truitt, S.; Torbert, R.

    2013-08-01T23:59:59.000Z

    The objective of this analysis is to roadmap the cost reductions and innovations necessary to achieve the U.S. Department of Energy (DOE) SunShot Initiative's total soft-cost targets by 2020. The roadmap focuses on advances in four soft-cost areas: (1) customer acquisition; (2) permitting, inspection, and interconnection (PII); (3) installation labor; and (4) financing. Financing cost reductions are in terms of the weighted average cost of capital (WACC) for financing PV system installations, with real-percent targets of 3.0% (residential) and 3.4% (commercial).

  11. Low Cost Lithography Tool for High Brightness LED Manufacturing

    SciTech Connect (OSTI)

    Andrew Hawryluk; Emily True

    2012-06-30T23:59:59.000Z

    The objective of this activity was to address the need for improved manufacturing tools for LEDs. Improvements include lower cost (both capital equipment cost reductions and cost-ofownership reductions), better automation and better yields. To meet the DOE objective of $1- 2/kilolumen, it will be necessary to develop these highly automated manufacturing tools. Lithography is used extensively in the fabrication of high-brightness LEDs, but the tools used to date are not scalable to high-volume manufacturing. This activity addressed the LED lithography process. During R&D and low volume manufacturing, most LED companies use contact-printers. However, several industries have shown that these printers are incompatible with high volume manufacturing and the LED industry needs to evolve to projection steppers. The need for projection lithography tools for LED manufacturing is identified in the Solid State Lighting Manufacturing Roadmap Draft, June 2009. The Roadmap states that Projection tools are needed by 2011. This work will modify a stepper, originally designed for semiconductor manufacturing, for use in LED manufacturing. This work addresses improvements to yield, material handling, automation and throughput for LED manufacturing while reducing the capital equipment cost.

  12. Direct/Indirect Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    This chapter provides recommended categories for direct and indirect elements developed by the Committee for Cost Methods Development (CCMD) and describes various estimating techniques for direct and indirect costs.

  13. About Cost Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    from the university, fee-for-service contracts, as well as establishing CAMD as a cost center. We know that our users are reluctant to see CAMD become a cost center, however...

  14. Progress Update: Stack Project Complete

    ScienceCinema (OSTI)

    Cody, Tom

    2012-06-14T23:59:59.000Z

    Progress update from the Savannah River Site. The 75 foot 293 F Stack, built for plutonium production, was cut down to size in order to prevent injury or release of toxic material if the structure were to collapse due to harsh weather.

  15. Export Control Overview and Update

    E-Print Network [OSTI]

    Wood, Marcelo A.

    Export Control Overview and Update Marci Copeland, Export Control Officer #12;US Export Laws #12 items including equipment, materials, software & technology is export restricted Licensing can impact research timeline Certain imports/exports may be detained or seized by Customs in the US or in other

  16. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's ÂŁ20

  17. Progress Update: Stack Project Complete

    SciTech Connect (OSTI)

    Cody, Tom

    2010-01-01T23:59:59.000Z

    Progress update from the Savannah River Site. The 75 foot 293 F Stack, built for plutonium production, was cut down to size in order to prevent injury or release of toxic material if the structure were to collapse due to harsh weather.

  18. Wind turbine reliability database update.

    SciTech Connect (OSTI)

    Peters, Valerie A.; Hill, Roger Ray; Stinebaugh, Jennifer A.; Veers, Paul S.

    2009-03-01T23:59:59.000Z

    This report documents the status of the Sandia National Laboratories' Wind Plant Reliability Database. Included in this report are updates on the form and contents of the Database, which stems from a fivestep process of data partnerships, data definition and transfer, data formatting and normalization, analysis, and reporting. Selected observations are also reported.

  19. Washington Update March 14, 2011

    E-Print Network [OSTI]

    Washington Update March 14, 2011 Nominations for the National Climate Assessment Development a very wide range of expertise is required on the NCADAC.Nominees are sought who have · sectoral expertise, including the natural environment, agriculture and forestry, energy, land cover and land use

  20. EPA Update: NESHAP Uranium Activities

    E-Print Network [OSTI]

    EPA Update: NESHAP Uranium Activities Reid J. Rosnick Environmental Protection Agency Radiation Protection Division (6608J) Washington, DC 20460 NMA/NRC Uranium Recovery Workshop July 2, 2009 #12 for underground uranium mining operations (Subpart B) EPA regulatory requirements for operating uranium mill

  1. Task Group 9 Update (Presentation)

    SciTech Connect (OSTI)

    Bosco, N.

    2014-04-01T23:59:59.000Z

    This presentation is a brief update of IEC TC82 QA Task Force, Group 9. Presented is an outline of the recently submitted New Work Item Proposal (NWIP) for a Comparative Thermal Cycling Test for CPV Modules to Differentiate Thermal Fatigue Durability.

  2. An Analysis of the Economic and Financial Life-Cycle Costs of Reverse-Osmosis Desalination in South Texas: A Case Study of the Southmost Facility

    E-Print Network [OSTI]

    Sturdivant, A.; Rister, M.; Rogers, C.; Lacewell, R.; Norris, J.; Leal, J.; Garza, J.; Adams, J.

    for $26.2 million, an implicit commitment for another $39.1 million (basis 2006 dollars) was also made for Continued and Capital Replacement costs. Investigation into life-cycle costs during the design and planning stages of a desalination facility can...

  3. Rough order of magnitude cost estimate for immobilization of 50 MT of plutonium using existing facilities at Hanford: alternative 11B

    SciTech Connect (OSTI)

    DiSabatino, A., LLNL

    1998-06-01T23:59:59.000Z

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 50 metric tons (nominal) of plutonium as a ceramic in an existing facility at Hanford, the Fuels and Materials Examination Facility (FMEF).

  4. Rough order of magnitude cost estimate for immobilization of 18.2 MT of plutonium using existing facilities at Hanford: alternative 4A/8/10/011

    SciTech Connect (OSTI)

    DiSabatino, A., LLNL

    1998-06-01T23:59:59.000Z

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 18.2 metric tons (nominal) of plutonium as a ceramic in an existing facility, the Fuels and Materials Examination Facility (FMEF), at Hanford.

  5. Report: Human Capital Discussion and Observations

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSAR -Department ofEM Communications August 24,U.S.

  6. Power Plant Cycling Costs

    SciTech Connect (OSTI)

    Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

    2012-07-01T23:59:59.000Z

    This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

  7. Keeping the Lights on While Cutting Costs.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1998-08-01T23:59:59.000Z

    In 1992, the Bonneville Power Administration spent $361 million in capital on a system to transmit electricity. By 1998, it was spending about one-third that amount: $123 million. In 1992, BPA`s expenses for managing, operating and maintaining the transmission system ran $160 million. By 1998, BPA had cut expenses to $128 million. Maintenance costs alone were cut 28%. In 1992, management of the grid was split into six organizations. Today, there is one. About 2,900 people worked for transmission in October 1992. By February 1998, the Transmission Business Line (TBL) employed 1,855. Transmission in 1992 for the most part meant new towers, lines and substations. Today it means computers, digital communications and electronic controls.

  8. Low Cost Hydrogen Production Platform

    SciTech Connect (OSTI)

    Timothy M. Aaron, Jerome T. Jankowiak

    2009-10-16T23:59:59.000Z

    A technology and design evaluation was carried out for the development of a turnkey hydrogen production system in the range of 2.4 - 12 kg/h of hydrogen. The design is based on existing SMR technology and existing chemical processes and technologies to meet the design objectives. Consequently, the system design consists of a steam methane reformer, PSA system for hydrogen purification, natural gas compression, steam generation and all components and heat exchangers required for the production of hydrogen. The focus of the program is on packaging, system integration and an overall step change in the cost of capital required for the production of hydrogen at small scale. To assist in this effort, subcontractors were brought in to evaluate the design concepts and to assist in meeting the overall goals of the program. Praxair supplied the overall system and process design and the subcontractors were used to evaluate the components and system from a manufacturing and overall design optimization viewpoint. Design for manufacturing and assembly (DFMA) techniques, computer models and laboratory/full-scale testing of components were utilized to optimize the design during all phases of the design development. Early in the program evaluation, a review of existing Praxair hydrogen facilities showed that over 50% of the installed cost of a SMR based hydrogen plant is associated with the high temperature components (reformer, shift, steam generation, and various high temperature heat exchange). The main effort of the initial phase of the program was to develop an integrated high temperature component for these related functions. Initially, six independent concepts were developed and the processes were modeled to determine overall feasibility. The six concepts were eventually narrowed down to the highest potential concept. A US patent was awarded in February 2009 for the Praxair integrated high temperature component design. A risk analysis of the high temperature component was conducted to identify any potential design deficiency related to the concept. The analysis showed that no fundamental design flaw existed with the concept, but additional simulations and prototypes would be required to verify the design prior to fabricating a production unit. These identified risks were addressed in detail during Phase II of the development program. Along with the models of the high temperature components, a detailed process and 3D design model of the remainder of system, including PSA, compression, controls, water treatment and instrumentation was developed and evaluated. Also, in Phase II of the program, laboratory/fullscale testing of the high temperature components was completed and stable operation/control of the system was verified. The overall design specifications and test results were then used to develop accurate hydrogen costs for the optimized system. Praxair continued development and testing of the system beyond the Phase II funding provided by the DOE through the end of 2008. This additional testing is not documented in this report, but did provide significant additional data for development of a prototype system as detailed in the Phase III proposal. The estimated hydrogen product costs were developed (2007 basis) for the 4.8 kg/h system at production rates of 1, 5, 10, 100 and 1,000 units built per year. With the low cost SMR approach, the product hydrogen costs for the 4.8 kg/h units at 50 units produced per year were approximately $3.02 per kg. With increasing the volume production to 1,000 units per year, the hydrogen costs are reduced by about 12% to $2.67 per kg. The cost reduction of only 12% is a result of significant design and fabrication efficiencies being realized in all levels of production runs through utilizing the DFMA principles. A simplified and easily manufactured design does not require large production volumes to show significant cost benefits. These costs represent a significant improvement and a new benchmark in the cost to produce small volume on-site hydrogen using existing process technologies. The cost mo

  9. Processing Cost Analysis for Biomass Feedstocks

    SciTech Connect (OSTI)

    Badger, P.C.

    2002-11-20T23:59:59.000Z

    The receiving, handling, storing, and processing of woody biomass feedstocks is an overlooked component of biopower systems. The purpose of this study was twofold: (1) to identify and characterize all the receiving, handling, storing, and processing steps required to make woody biomass feedstocks suitable for use in direct combustion and gasification applications, including small modular biopower (SMB) systems, and (2) to estimate the capital and operating costs at each step. Since biopower applications can be varied, a number of conversion systems and feedstocks required evaluation. In addition to limiting this study to woody biomass feedstocks, the boundaries of this study were from the power plant gate to the feedstock entry point into the conversion device. Although some power plants are sited at a source of wood waste fuel, it was assumed for this study that all wood waste would be brought to the power plant site. This study was also confined to the following three feedstocks (1) forest residues, (2) industrial mill residues, and (3) urban wood residues. Additionally, the study was confined to grate, suspension, and fluidized bed direct combustion systems; gasification systems; and SMB conversion systems. Since scale can play an important role in types of equipment, operational requirements, and capital and operational costs, this study examined these factors for the following direct combustion and gasification system size ranges: 50, 20, 5, and 1 MWe. The scope of the study also included: Specific operational issues associated with specific feedstocks (e.g., bark and problems with bridging); Opportunities for reducing handling, storage, and processing costs; How environmental restrictions can affect handling and processing costs (e.g., noise, commingling of treated wood or non-wood materials, emissions, and runoff); and Feedstock quality issues and/or requirements (e.g., moisture, particle size, presence of non-wood materials). The study found that over the years the industry has shown a good deal of ingenuity and, as a result, has developed several cost effective methods of processing and handling wood. SMB systems usually cannot afford to perform much onsite processing and therefore usually purchase fuels processed to specification. Owners of larger systems try to minimize onsite processing to minimize processing costs. Whole truck dumpers are expensive, but allow for faster and easier unloading, which reduces labor costs and charges by the haulers. Storage costs are a major factor in overall costs, thus the amount of fuel reserve is an important consideration. Silos and bins are relatively expensive compared to open piles used for larger facilities, but may be required depending on space available, wood characteristics, and amount of wood to be stored. For larger systems, a front-end loader has a lot of flexibility in use and is an essential piece of equipment for moving material. Few opportunities appear to exist for improving the cost effectiveness of these systems.

  10. INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE ...

    Broader source: Energy.gov (indexed) [DOE]

    ICRICE SOPSep 2013Final.pdf More Documents & Publications ICR-ICE Standard Operating Procedures (Update Sept 2013) Contractor SOW Template - ICR Contractor SOW Template - ICE...

  11. Cost Model for Digital Curation: Cost of Digital Migration

    E-Print Network [OSTI]

    Kejser, Ulla Břgvad; Nielsen, Anders Bo; Thirifays, Alex

    2009-01-01T23:59:59.000Z

    notes that comparisons of cost data remain difficult becausethese resources into cost data, and a description of themigrations), the cost of processing the data may rise

  12. Hydrogen Refueling Station Costs in Shanghai

    E-Print Network [OSTI]

    Weinert, Jonathan X.; Shaojun, Liu; Ogden, J; Jianxin, Ma

    2006-01-01T23:59:59.000Z

    Costs Annualized Investment Cost, 1000$/yr Total AnnualizedH2 Fueling Stations Investment Cost Cost ($/yr) OperatingH2 Fueling Stations Investment Cost Cost ($/kg) Operating

  13. Economic and Conservation Evaluation of Capital Renovation Projects: United Irrigation District of Hidalgo County (United) – Rehabilitation of Main Canal, Laterals, and Diversion Pump Station – Final

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.

    savings analyses provide estimates of the economic costs per acre-foot of water savings and per BTU (kwh) of energy savings associated with one to five proposed capital improvement activity(ies) (each referred to as a component). An aggregate assessment... publications. This analysis report is based on the best information available at the time and is subject to an array of2 resource limitations. At times, District management’s best educated estimates (or that of the consulting engineer) are used to base cost...

  14. Updated Axion CDM energy density

    E-Print Network [OSTI]

    Ji-Haeng Huh

    2008-10-08T23:59:59.000Z

    We update cosmological bound on axion model. The contribution from the anharmonic effect and the newly introduced initial overshoot correction are considered. We present an explicit formula for the axion relic density in terms of the QCD scale Lambda_{QCD}, the current quark masses m_q's and the Peccei-Quinn scale F_a, including firstly introduced 1.85 factor which is from the initial overshoot.

  15. GHG Update/CAP Progress ReportGHG Update/CAP Progress Report 2010 GHG Update2010 GHG Update

    E-Print Network [OSTI]

    Zhou, Pei

    i i f t d d 486­ Duke Energy emission factors decreased .486 kgCO2/kWh to .405 kgCO2/kWh · Steam Percentages 15% 1% (~328,000 MTeCO2) 13% 1% (~307,000 MTeCO2) 44% 10% 15% 49%1% 11% 44% 1% 1% 28% Electricity Update 450000 500000 250000 300000 350000 400000 CO2 100000 150000 200000 250000 MTeC 0 50000 1990 1991

  16. Agricultural and Resource Economics Update

    E-Print Network [OSTI]

    2011-01-01T23:59:59.000Z

    the cost of adjust- ment to biofuels. Both the introductionbioeconomy” and include biofuels, biotechnology, and green-and the adoption of new biofuels by consumers will be

  17. U.S. Department of Energy Hydrogen Storage Cost Analysis

    SciTech Connect (OSTI)

    Law, Karen; Rosenfeld, Jeffrey; Han, Vickie; Chan, Michael; Chiang, Helena; Leonard, Jon

    2013-03-11T23:59:59.000Z

    The overall objective of this project is to conduct cost analyses and estimate costs for on- and off-board hydrogen storage technologies under development by the U.S. Department of Energy (DOE) on a consistent, independent basis. This can help guide DOE and stakeholders toward the most-promising research, development and commercialization pathways for hydrogen-fueled vehicles. A specific focus of the project is to estimate hydrogen storage system cost in high-volume production scenarios relative to the DOE target that was in place when this cost analysis was initiated. This report and its results reflect work conducted by TIAX between 2004 and 2012, including recent refinements and updates. The report provides a system-level evaluation of costs and performance for four broad categories of on-board hydrogen storage: (1) reversible on-board metal hydrides (e.g., magnesium hydride, sodium alanate); (2) regenerable off-board chemical hydrogen storage materials(e.g., hydrolysis of sodium borohydride, ammonia borane); (3) high surface area sorbents (e.g., carbon-based materials); and 4) advanced physical storage (e.g., 700-bar compressed, cryo-compressed and liquid hydrogen). Additionally, the off-board efficiency and processing costs of several hydrogen storage systems were evaluated and reported, including: (1) liquid carrier, (2) sodium borohydride, (3) ammonia borane, and (4) magnesium hydride. TIAX applied a â��bottom-upâ� costing methodology customized to analyze and quantify the processes used in the manufacture of hydrogen storage systems. This methodology, used in conjunction with DFMA�® software and other tools, developed costs for all major tank components, balance-of-tank, tank assembly, and system assembly. Based on this methodology, the figure below shows the projected on-board high-volume factory costs of the various analyzed hydrogen storage systems, as designed. Reductions in the key cost drivers may bring hydrogen storage system costs closer to this DOE target. In general, tank costs are the largest component of system cost, responsible for at least 30 percent of total system cost, in all but two of the 12 systems. Purchased BOP cost also drives system cost, accounting for 10 to 50 percent of total system cost across the various storage systems. Potential improvements in these cost drivers for all storage systems may come from new manufacturing processes and higher production volumes for BOP components. In addition, advances in the production of storage media may help drive down overall costs for the sodium alanate, SBH, LCH2, MOF, and AX-21 systems.

  18. Pension costs and liabilities

    E-Print Network [OSTI]

    Courtney, Harley Macon

    1961-01-01T23:59:59.000Z

    be to charge the cost over the current and subsequent years on the assumption that the cost, even though measured by past services, is incurred in contemplation of present and future 1 services. 1'he development of accounting thought concerning retire...? present liabilities are under- stated and owner's equity is overstated by a corresponding amount. It seems, however, that charging retained earnings with the past service cost does not, represent the true picture. Pension payments based solely on past...

  19. Cost analysis guidelines

    SciTech Connect (OSTI)

    Strait, R.S.

    1996-01-10T23:59:59.000Z

    The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy`s (DOE`s) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies.

  20. INDEPENDENT COST REVIEW (ICR)

    Energy Savers [EERE]

    experience - as needed - in project management, scheduling, cost estimatingcost engineering, risk management, as well as subject matter experts (SMEs) with knowledge of...