Sample records for update northwest pipeline

  1. FERC approves Northwest pipeline expansion

    SciTech Connect (OSTI)

    Not Available

    1992-06-15

    Northwest Pipeline Co., Salt Lake City, Utah, received a final permit from the Federal Energy Regulatory Commission for a $373.4 million main gas line expansion. This paper reports that it plans to begin construction of the 443 MMcfd expansion in mid-July after obtaining further federal, state, and local permits. The expanded system is to be fully operational by second quarter 1993. When the expansion is complete, total Northwest system mileage will be 3,936 miles and system capacity about 2.49 bcfd.

  2. Keystone XL pipeline update

    Broader source: Energy.gov [DOE]

    Questions have been raised recently about the Keystone XL pipeline project, so we wanted to make some points clear.

  3. Geothermal pipeline: Progress and development update, geothermal program monitor

    SciTech Connect (OSTI)

    1995-02-01

    This paper is a progress and development update describing three projects in the U.S. which involve the use of geothermal energy and ground-source heat pumps. The first project is located at Fort Polk Army Base in Louisiana. Four thousand government housing units are being retrofitted with efficient ground-soured near Bend, Oregon.

  4. Northwest

    Broader source: Energy.gov (indexed) [DOE]

    Northwest Climate C hange a nd t he U .S. E nergy S ector: Regional v ulnerabilities a nd r esilience s olutions Summary i n B rief The N orthwest h as a d iverse t opography w ith ...

  5. The Northwest Infrared (NWIR) gas-phase spectral database of industrial and environmental chemicals: Recent updates

    SciTech Connect (OSTI)

    Brauer, Carolyn S.; Johnson, Timothy J.; Blake, Thomas A.; Sharpe, Steven W.; Sams, Robert L.; Tonkyn, Russell G.

    2014-05-22

    With continuing improvements in both standoff- and point-sensing techniques, there is an ongoing need for high-quality infrared spectral databases. The Northwest Infrared Database (NWIR) contains quantitative, gas-phase infrared spectra of nearly 500 pure chemical species that can be used for a variety of applications such as atmospheric monitoring, biomass burning studies, etc. The data, recorded at 0.1 cm-1 resolution, are pressure broadened to one atmosphere (N2) in order to mimic atmospheric conditions. Each spectrum is a composite composed of multiple individual measurements. Recent updates to the database include over 60 molecules that are known or suspected biomass-burning effluents. Examples from this set of measurements will be presented and experimental details will be discussed in the context of the utility of NWIR for environmental applications.

  6. EIA - Natural Gas Pipeline Network - Natural Gas Pipeline Mileage...

    U.S. Energy Information Administration (EIA) Indexed Site

    Mileage by State About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Estimated Natural Gas Pipeline Mileage in the ...

  7. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    Supply from the Rockies to the Northwest and Northern California was limited by maintenance at Northwest Pipelines Kemmerer Compressor Station in Wyoming. In addition, a...

  8. EIA - Natural Gas Pipeline Network - Intrastate Natural Gas Pipeline

    U.S. Energy Information Administration (EIA) Indexed Site

    Segment Intrastate Natural Gas Pipeline Segment About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Intrastate Natural Gas Pipeline Segment Overview Intrastate natural gas pipelines operate within State borders and link natural gas producers to local markets and to the interstate pipeline network. Approximately 29 percent of the total miles of natural gas pipeline in the U.S. are intrastate pipelines. Although an intrastate

  9. EIA - Natural Gas Pipeline Network - Largest Natural Gas Pipeline Systems

    U.S. Energy Information Administration (EIA) Indexed Site

    Interstate Pipelines Table About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Thirty Largest U.S. Interstate Natural Gas Pipeline Systems, 2008 (Ranked by system capacity) Pipeline Name Market Regions Served Primary Supply Regions States in Which Pipeline Operates Transported in 2007 (million dekatherm)1 System Capacity (MMcf/d) 2 System Mileage Columbia Gas Transmission Co. Northeast Southwest, Appalachia DE, PA, MD, KY, NC, NJ, NY,

  10. EIA - Natural Gas Pipeline Network - Interstate Pipelines Segment

    U.S. Energy Information Administration (EIA) Indexed Site

    Interstate Natural Gas Pipeline Segment About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Interstate Natural Gas Pipeline Segment Two-thirds of the lower 48 States are almost totally dependent upon the interstate pipeline system for their supplies of natural gas. On the interstate pipeline grid, the long-distance, wide-diameter (20-42 inch), high capacity trunklines carry most of the natural gas that is transported throughout the

  11. EIA - Natural Gas Pipeline Network - Pipeline Capacity and Utilization

    U.S. Energy Information Administration (EIA) Indexed Site

    Pipeline Utilization & Capacity About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Pipeline Capacity & Utilization Overview | Utilization Rates | Integration of Storage | Varying Rates of Utilization | Measures of Utilization Overview of Pipeline Utilization Natural gas pipeline companies prefer to operate their systems as close to full capacity as possible to maximize their revenues. However, the average

  12. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    in Alberta, Chicago Citygate, Houston Ship Channel, San Juan Basin, Southern California border, Transco Zone 6, Northwest Pipeline Rockies, and Panhandle Eastern Pipe Line Co....

  13. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    capacity according to service priority. Northwest Pipeline also reported that the Jackson Prairie storage facility in Chehalis, Washington will upgrade its control system...

  14. EIA - Natural Gas Pipeline Network - Generalized Natural Gas Pipeline

    U.S. Energy Information Administration (EIA) Indexed Site

    Capacity Design Schematic Generalized Design Schematic About U.S. Natural Gas Pipelines- Transporting Natural Gas based on data through 2007/2008 with selected updates Generalized Natural Gas Pipeline Capacity Design Schematic Generalized Natural Gas Pipeline Capcity Design Schematic

  15. Natural Gas Weekly Update, Printer-Friendly Version

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    be placed into service at the same time as the main pipeline system. As part of the Jackson Prairie deliverability expansion project in Utah, Northwest Pipeline Company...

  16. Natural Gas Weekly Update, Printer-Friendly Version

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Supply from the Rockies to the Northwest and Northern California was limited by maintenance at Northwest Pipelines Kemmerer Compressor Station in Wyoming. In addition, a...

  17. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Update: Gulf South Pipeline Company began scheduled maintenance on the Jackson Compressor Station in central Mississippi on Tuesday, September 12. The maintenance...

  18. EIA - Natural Gas Pipeline Network - Natural Gas Pipeline Compressor

    U.S. Energy Information Administration (EIA) Indexed Site

    Stations Compressor Stations Illustration About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates U.S. Natural Gas Pipeline Compressor Stations Illustration, 2008 Map of U.S. Natural Gas Pipeline Compressor Stations Source: Energy Information Administration, Office of Oil & Gas, Natural Gas Division, Natural Gas Transportation Information System. The EIA has determined that the informational map displays here do not raise security

  19. EIA - Natural Gas Pipeline Network - Natural Gas Pipeline Development &

    U.S. Energy Information Administration (EIA) Indexed Site

    Expansion Pipelinesk > Development & Expansion About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Pipeline Development and Expansion Timing | Determining Market Interest | Expansion Options | Obtaining Approval | Prefiling Process | Approval | Construction | Commissioning Timing and Steps for a New Project An interstate natural gas pipeline construction or expansion project takes an average of about three years

  20. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    issued an OFO warning to all shippers. The pipeline further noted that as long as the Jackson Prairie storage balance exceeds 1.2 million Dth, Northwest will use its storage...

  1. EIA - Natural Gas Pipeline System - Central Region

    U.S. Energy Information Administration (EIA) Indexed Site

    Central Region About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Pipelines in the Central Region Overview | Domestic Gas | Exports | Regional Pipeline Companies & Links Overview Twenty-two interstate and at least thirteen intrastate natural gas pipeline companies (see Table below) operate in the Central Region (Colorado, Iowa, Kansas, Missouri, Montana, Nebraska, North Dakota, South Dakota, Utah, and Wyoming). Twelve

  2. EIA - Natural Gas Pipeline System - Midwest Region

    U.S. Energy Information Administration (EIA) Indexed Site

    Midwest Region About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Pipelines in the Midwest Region Overview | Domestic Gas | Canadian Imports | Regional Pipeline Companies & Links Overview Twenty-six interstate and at least eight intrastate natural gas pipeline companies operate within the Midwest Region (Illinois, Indiana, Michigan, Minnesota, Ohio, and Wisconsin). The principal sources of natural gas supply for the

  3. EIA - Natural Gas Pipeline System - Northeast Region

    U.S. Energy Information Administration (EIA) Indexed Site

    Northeast Region About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Pipelines in the Northeast Region Overview | Domestic Gas | Canadian Imports | Regional Pipeline Companies & Links Overview Twenty interstate natural gas pipeline systems operate within the Northeast Region (Connecticut, Delaware, Massachusetts, Maine, New Hampshire, New Jersey, New York, Pennsylvania, Rhode Island, Virginia, and West Virginia). These

  4. EIA - Natural Gas Pipeline System - Southeast Region

    U.S. Energy Information Administration (EIA) Indexed Site

    Southeast Region About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Pipelines in the Southeast Region Overview | Transportation to Atlantic & Gulf States | Gulf of Mexico Transportation Corridor | Transportation to the Northern Tier | Regional Pipeline Companies & Links Overview Twenty-three interstate, and at least eight intrastate, natural gas pipeline companies operate within the Southeast Region (Alabama,

  5. EIA - Natural Gas Pipeline System - Southwest Region

    U.S. Energy Information Administration (EIA) Indexed Site

    Southwest Region About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Pipelines in the Southwest Region Overview | Export Transportation | Intrastate | Connection to Gulf of Mexico | Regional Pipeline Companies & Links Overview Most of the major onshore interstate natural gas pipeline companies (see Table below) operating in the Southwest Region (Arkansas, Louisiana, New Mexico, Oklahoma, and Texas) are primarily

  6. EIA - Natural Gas Pipeline System - Western Region

    U.S. Energy Information Administration (EIA) Indexed Site

    Western Region About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Pipelines in the Western Region Overview | Transportation South | Transportation North | Regional Pipeline Companies & Links Overview Ten interstate and nine intrastate natural gas pipeline companies provide transportation services to and within the Western Region (Arizona, California, Idaho, Nevada, Oregon, and Washington), the fewest number serving

  7. EIA - Natural Gas Pipeline Network - Regional/State Underground...

    U.S. Energy Information Administration (EIA) Indexed Site

    RegionalState Underground Natural Gas Storage Table About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Regional ...

  8. EIA - Natural Gas Pipeline Network - Natural Gas Transmission...

    U.S. Energy Information Administration (EIA) Indexed Site

    Transmission Path Diagram About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Natural Gas Transmission Path Natural ...

  9. Worldwide pipelines and contractors directory

    SciTech Connect (OSTI)

    1999-11-01

    This directory contains information on the following: pipeline contractors; US natural gas pipelines; US crude oil pipelines; US product pipelines; Canadian pipelines and foreign pipelines.

  10. Energy Northwest

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    corporate alternative minimum taxable income. See "TAX MATTERS" herein. 664,515,000 ENERGY NORTHWEST 155,390,000 Project 1 Electric Revenue Refunding Bonds, Series 2012-A...

  11. Natural Gas Weekly Update, Printer-Friendly Version

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    in Alberta, Chicago Citygate, Houston Ship Channel, San Juan Basin, Southern California border, Transco Zone 6, Northwest Pipeline Rockies, and Panhandle Eastern Pipe Line Co....

  12. Natural Gas Weekly Update, Printer-Friendly Version

    Gasoline and Diesel Fuel Update (EIA)

    Energy also owns. Northwest Pipeline Company on Wednesday, December 9, said that its Jackson Prairie storage facility in Lewis County, Washington, will require maintenance after...

  13. Natural Gas Weekly Update, Printer-Friendly Version

    Gasoline and Diesel Fuel Update (EIA)

    capacity according to service priority. Northwest Pipeline also reported that the Jackson Prairie storage facility in Chehalis, Washington will upgrade its control system...

  14. Natural Gas Weekly Update, Printer-Friendly Version

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    excess storage injections. As a result of very high linepack and full storage at the Jackson Prairie storage facility, Northwest Pipeline Corporation declared a general...

  15. EIA - Natural Gas Pipeline System - Links to U.S. Natural Gas Pipeline

    U.S. Energy Information Administration (EIA) Indexed Site

    Systems Links About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Links to U.S. Natural Gas Pipeline Information - The links below will either direct the user to a narrative describing the system, a pipeline system map, a FERC prescribed "Informational Postings" page, or a FERC Tariff Sheet. Pipeline Name Type of System Regions of Operations Acadian Gas Pipeline System Intrastate Southwest Algonquin Gas Transmission Co

  16. Energy Northwest

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of interest on, the Series 2015-C Bonds. See "TAX MATTERS" herein. 110,000,000* ENERgY NORThwEST 43,000,000* Project 1 Electric Revenue Refunding Bonds, Series 2015-C...

  17. Energy Northwest

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    receipt of interest on the Series 2014-C Bonds. See "TAX MATTERS" herein. 269,415,000 ENERgY NORThWEST 197,110,000 Project 1 Electric Revenue Refunding Bonds, Series 2014-C...

  18. Energy Northwest

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of interest on, the Series 2014-AB Bonds. See "TAX MATTERS" herein. 634,230,000 ENERgY NORThWEST 517,720,000 Columbia generating Station Electric Revenue and Refunding...

  19. Energy Northwest

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    as ammended. See "TAX MATTERS-SERIES 2012-C (TAXABLE) BONDS" herein. 157,350,000 Energy Northwest 41,285,000 Project 1 Electric Revenue Refunding Bonds, Series 2012-B...

  20. Energy Northwest

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    103 of the Code. See "TAX MATTERS-SERIES 2012-E (TAXABLE) BONDS" herein. 782,655,000 ENERGY NORTHWEST 34,140,000 Columbia Generating Station Electric Revenue Bonds, Series...

  1. Energy Northwest

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of interest on, the Series 2015-C Bonds. See "TAX MATTERS" herein. 109,205,000 EnErgy northwEst 44,005,000 Project 1 Electric revenue refunding Bonds, series 2015-C...

  2. Pacific Northwest Storms Situation Report # 3

    SciTech Connect (OSTI)

    2006-12-17

    Significant progress has been made in restoring power to customers in the Pacific Northwest region. Currently, 468,200 customers, including Canada, remain without power. This is down from 1.8 million customers who lost power following severe wind and snow storms on December 14-15, 2006. The customers without power represent about 16 percent of customers in the affected utility service areas of Oregon and Washington. See table below. The Olympic pipeline reports that the pipeline is operational; however, pipeline throughput remains reduced since one substation along the line remains without power. Complete power restoration is expected later today. There are no reports of problems regarding fuel distribution and production.

  3. EIA - Natural Gas Pipeline Network - Regional Overview and Links

    U.S. Energy Information Administration (EIA) Indexed Site

    Overview and Links About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Regional Overviews and Links to Pipeline Companies Through a series of interconnecting interstate and intrastate pipelines the transportation of natural gas from one location to another within the United States has become a relatively seamless operation. While intrastate pipeline systems often transports natural gas from production areas directly to consumers in

  4. EIA - Natural Gas Pipeline Network - States Dependent on Interstate

    U.S. Energy Information Administration (EIA) Indexed Site

    Pipelines Map States Dependent on Interstate Pipelines About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates States in grey which are at least 85% dependent on the interstate pipeline network for their natural gas supply are: New England - Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont Southeast - Florida, Georgia, North Carolina, South Carolina, Tennessee Northeast - Delaware, Maryland, New Jersey, New

  5. EIA - Natural Gas Pipeline Network - Underground Natural Gas Storage

    U.S. Energy Information Administration (EIA) Indexed Site

    Storage About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Underground Natural Gas Storage Overview | Regional Breakdowns Overview Underground natural gas storage provides pipelines, local distribution companies, producers, and pipeline shippers with an inventory management tool, seasonal supply backup, and access to natural gas needed to avoid imbalances between receipts and deliveries on a pipeline network. There are three

  6. EIA - Natural Gas Pipeline Network - U.S. Natural Gas Pipeline Network Map

    U.S. Energy Information Administration (EIA) Indexed Site

    Network Map About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates U.S. Natural Gas Pipeline Network, 2009 U.S. Natural Gas Pipeline Network Map The EIA has determined that the informational map displays here do not raise security concerns, based on the application of the Federal Geographic Data Committee's Guidelines for Providing Appropriate Access to Geospatial Data in Response to Security Concerns

  7. Natural gas pipeline technology overview.

    SciTech Connect (OSTI)

    Folga, S. M.; Decision and Information Sciences

    2007-11-01

    The United States relies on natural gas for one-quarter of its energy needs. In 2001 alone, the nation consumed 21.5 trillion cubic feet of natural gas. A large portion of natural gas pipeline capacity within the United States is directed from major production areas in Texas and Louisiana, Wyoming, and other states to markets in the western, eastern, and midwestern regions of the country. In the past 10 years, increasing levels of gas from Canada have also been brought into these markets (EIA 2007). The United States has several major natural gas production basins and an extensive natural gas pipeline network, with almost 95% of U.S. natural gas imports coming from Canada. At present, the gas pipeline infrastructure is more developed between Canada and the United States than between Mexico and the United States. Gas flows from Canada to the United States through several major pipelines feeding U.S. markets in the Midwest, Northeast, Pacific Northwest, and California. Some key examples are the Alliance Pipeline, the Northern Border Pipeline, the Maritimes & Northeast Pipeline, the TransCanada Pipeline System, and Westcoast Energy pipelines. Major connections join Texas and northeastern Mexico, with additional connections to Arizona and between California and Baja California, Mexico (INGAA 2007). Of the natural gas consumed in the United States, 85% is produced domestically. Figure 1.1-1 shows the complex North American natural gas network. The pipeline transmission system--the 'interstate highway' for natural gas--consists of 180,000 miles of high-strength steel pipe varying in diameter, normally between 30 and 36 inches in diameter. The primary function of the transmission pipeline company is to move huge amounts of natural gas thousands of miles from producing regions to local natural gas utility delivery points. These delivery points, called 'city gate stations', are usually owned by distribution companies, although some are owned by transmission companies. Compressor stations at required distances boost the pressure that is lost through friction as the gas moves through the steel pipes (EPA 2000). The natural gas system is generally described in terms of production, processing and purification, transmission and storage, and distribution (NaturalGas.org 2004b). Figure 1.1-2 shows a schematic of the system through transmission. This report focuses on the transmission pipeline, compressor stations, and city gates.

  8. Pipeline Expansions

    Reports and Publications (EIA)

    1999-01-01

    This appendix examines the nature and type of proposed pipeline projects announced or approved for construction during the next several years in the United States. It also includes those projects in Canada and Mexico that tie-in with the U.S. markets or projects.

  9. Hydrogen Pipeline Working Group Workshop: Code for Hydrogen Pipelines...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Working Group Workshop: Code for Hydrogen Pipelines Hydrogen Pipeline Working Group Workshop: Code for Hydrogen Pipelines Code for Hydrogen Piping and Pipelines. B31 Hydrogen ...

  10. Natural Gas Weekly Update, Printer-Friendly Version

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Update: Gulf South Pipeline Company began scheduled maintenance on the Jackson Compressor Station in central Mississippi on Tuesday, September 12. The maintenance...

  11. Natural Gas Weekly Update, Printer-Friendly Version

    Gasoline and Diesel Fuel Update (EIA)

    May 5, according to the Coast Guard. Natural Gas Transportation Update Alliance Pipeline Inc. experienced unforeseen mechanical difficulties while performing inspections at the...

  12. EIA - Natural Gas Pipeline Network - Natural Gas Supply Basins...

    U.S. Energy Information Administration (EIA) Indexed Site

    Corridors About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates U.S. Natural Gas Supply Basins Relative to Major Natural ...

  13. EIA - Natural Gas Pipeline Network - Aquifer Storage Reservoir

    U.S. Energy Information Administration (EIA) Indexed Site

    Configuration Aquifer Storage Reservoir Configuration About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Aquifer Underground Natural Gas Storage Reservoir Configuration Aquifer Underground Natural Gas Well

  14. EIA - Natural Gas Pipeline Network - Depleted Reservoir Storage

    U.S. Energy Information Administration (EIA) Indexed Site

    Configuration Depleted Reservoir Storage Configuration About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Depleted Production Reservoir Underground Natural Gas Storage Well Configuration Depleted Production Reservoir Storage

  15. EIA - Natural Gas Pipeline Network - Region To Region System Capacity

    U.S. Energy Information Administration (EIA) Indexed Site

    Levels Interregional Capacity About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Interregional Natural Gas Transmission Pipeline Capacity, Close of 2008 (Million cubic feet per day) Map of Interregional Natural Gas Transmission Pipeline Capacity in 2008 The EIA has determined that the informational map displays here do not raise security concerns, based on the application of the Federal Geographic Data Committee's Guidelines for

  16. Energy Northwest | Open Energy Information

    Open Energy Info (EERE)

    Northwest Jump to: navigation, search Name: Energy Northwest Place: Washington Website: www.energy-northwest.comPages Twitter: @EnergyNorthwest Facebook: https:www.facebook.com...

  17. EIA - Natural Gas Pipeline Network - Expansion Process Flow Diagram

    U.S. Energy Information Administration (EIA) Indexed Site

    Development & Expansion > Development and Expansion Process Figure About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Development and Expansion Process For Natural Gas Pipeline Projects Figure showing the expansion process

  18. EIS-0501: FERC Project Update | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FERC Project Update EIS-0501: FERC Project Update Golden Pass LNG Export and Pipeline Project, Texas and Louisiana After conducting scoping for an EA for the proposed Golden Pass ...

  19. EIA - Natural Gas Pipeline Network - Natural Gas Supply Basins Relative to

    U.S. Energy Information Administration (EIA) Indexed Site

    Major Natural Gas Pipeline Transportation Corridors Corridors About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates U.S. Natural Gas Supply Basins Relative to Major Natural Gas Pipeline Transportation Corridors, 2008 U.S. Natural Gas Transporation Corridors out of Major Supply Basins

  20. Northwest Energy Market Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Northwest Energy Market Assessment Pages Northwest-Energy-Market-Assessment Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects &...

  1. EIA - Natural Gas Pipeline Network - Natural Gas Imports/Exports Pipelines

    U.S. Energy Information Administration (EIA) Indexed Site

    Pipelines About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Import/Export Pipelines As of the close of 2008 the United States has 58 locations where natural gas can be exported or imported. 24 locations are for imports only 18 locations are for exports only 13 locations are for both imports and exports 8 locations are liquefied natural gas (LNG) import facilities Imported natural gas in 2007 represented almost 16 percent

  2. Paducah Gaseous Diffusion Plant - GW OU Northwest Plume | Department of

    Office of Environmental Management (EM)

    Energy Gaseous Diffusion Plant - GW OU Northwest Plume Paducah Gaseous Diffusion Plant - GW OU Northwest Plume January 1, 2014 - 12:00pm Addthis US Department of Energy Groundwater Database Groundwater Master Report InstallationName, State: Paducah Gaseous Diffusion Plant, KY Responsible DOE Office: Office of Environmental Management Plume Name: GW OU Northwest Plume Remediation Contractor: LATA Environmental Services of Kentucky, LLC PBS Number: PA-0040 Report Last Updated: 2014

  3. Components in the Pipeline

    SciTech Connect (OSTI)

    Gorton, Ian; Wynne, Adam S.; Liu, Yan; Yin, Jian

    2011-02-24

    Scientists commonly describe their data processing systems metaphorically as software pipelines. These pipelines input one or more data sources and apply a sequence of processing steps to transform the data and create useful results. While conceptually simple, pipelines often adopt complex topologies and must meet stringent quality of service requirements that place stress on the software infrastructure used to construct the pipeline. In this paper we describe the MeDICi Integration Framework, which is a component-based framework for constructing complex software pipelines. The framework supports composing pipelines from distributed heterogeneous software components and provides mechanisms for controlling qualities of service to meet demanding performance, reliability and communication requirements.

  4. 1997 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1997-12-01

    The 1997 White Book is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; and (2) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. Data detailing Pacific Northwest non-utility generating (NUG) resources is also available upon request. This analysis updates the 1996 pacific Northwest Loads and Resources Study, published in December 1996. In this loads and resources study, resource availability is compared with a medium forecast of electricity consumption. This document analyzes the Pacific Northwest`s projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system which includes loads and resources in addition to the Federal system. This study presents the Federal system and regional analyses for the medium load forecast. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 1998--99 through 2007--08.

  5. Fiber Reinforced Composite Pipelines

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rawls Savannah River National Laboratory This presentation does not contain proprietary, confidential, or otherwise restricted information Fiber Reinforced Composite Pipelines ...

  6. Subsea pipeline connection

    SciTech Connect (OSTI)

    Langner, C. G.

    1985-12-17

    A method and apparatus are provided for laying an offshore pipeline or flowline bundle to a deepwater subsea structure. The pipeline or flowline bundle is laid along a prescribed path, preferably U-shape, such that a pullhead at the terminus of the pipeline or flowline bundle falls just short of the subsea structure. A pull-in tool connected to the pipeline or flowline bundle by a short length of pull cable is then landed on and latched to the subsea structure, and the pipeline or flowline bundle is pulled up to the subsea structure by the pull-in tool and pull cable.

  7. Final EIS Keystone Pipeline Project Appendix E Pipeline Restrictive Layer

    Energy Savers [EERE]

    E Pipeline Restrictive Layer Areas Crossings Final EIS Keystone Pipeline Project Appendix F Soil Associations along the Keystone Pipeline Project Route Final EIS Keystone Pipeline Project Appendix F Soil Associations along the Keystone Pipeline Project Route Appendix G Public Water Supply Wells Within One Mile of the Proposed Keystone Pipeline Project Centerline (Note: This appendix is Table 3.5-6, taken directly from the Environmental Report for the Keystone Pipeline Project [TransCanada

  8. EIA - Natural Gas Pipeline Network - Network Configuration & System Design

    U.S. Energy Information Administration (EIA) Indexed Site

    Network Configuration & System Design About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Network Configuration and System Design Overview | Transmission/Storage | Design Criteria | Importance of Storage| Overall Pipeline System Configuration Overview A principal requirement of the natural gas transmission system is that it be capable of meeting the peak demand of its shippers who have contracts for firm service. To meet this

  9. EIA - Natural Gas Pipeline Network - Transportation Process & Flow

    U.S. Energy Information Administration (EIA) Indexed Site

    Process and Flow About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Transportation Process and Flow Overview | Gathering System | Processing Plant | Transmission Grid | Market Centers/Hubs | Underground Storage | Peak Shaving Overview Transporting natural gas from the wellhead to the final customer involves several physical transfers of custody and multiple processing steps. A natural gas pipeline system begins at the natural gas

  10. EIA - Natural Gas Pipeline Network - Regional Definitions

    U.S. Energy Information Administration (EIA) Indexed Site

    Definitions Map About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Regional Definitions The regions defined in the above map are based upon the 10 Federal Regions of the U.S. Bureau of Labor Statistics. The State groupings are as follows: Northeast Region - Federal Region 1: Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont. Federal Region 2: New Jersey, and New York. Federal Region 3:Delaware, District of

  11. EIA - Natural Gas Pipeline Network - Regulatory Authorities

    U.S. Energy Information Administration (EIA) Indexed Site

    Regulatory Authorities About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates U.S. Natural Gas Regulatory Authorities Beginning | Regulations Today | Coordinating Agencies | Regulation of Mergers and Acquisitions Beginning of Industry Restructuring In April 1992, the Federal Energy Regulatory Commission (FERC) issued its Order 636 and transformed the interstate natural gas transportation segment of the industry forever. Under it,

  12. Gulf of Mexico pipelines heading into deeper waters

    SciTech Connect (OSTI)

    True, W.R.

    1987-06-08

    Pipeline construction for Gulf of Mexico federal waters is following drilling and production operations into deeper waters, according to U.S. Department of Interior (DOI) Minerals Management Service (MMS) records. Review of MMS 5-year data for three water depth categories (0-300 ft, 300-600 ft, and deeper than 600 ft) reveals this trend in Gulf of Mexico pipeline construction. Comparisons are shown between pipeline construction applications that were approved by the MMS during this period and projects that have been reported to the MMS as completed. This article is the first of annual updates of MMS gulf pipeline data. Future installments will track construction patterns in water depths, diameter classifications, and mileage. These figures will also be evaluated in terms of pipeline-construction cost data.

  13. Product Pipeline Reports Tutorial

    U.S. Energy Information Administration (EIA) Indexed Site

    Petroleum > Petroleum Survey Forms> Petroleum Survey Forms Tutorial Product Pipeline Reports Tutorial Content on this page requires a newer version of Adobe Flash Player. Get Adobe ...

  14. Energy Northwest, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to Section 103 of the Internal Revenue Code of 1986. See "TAX MATTERS" herein. ENERGY NORTHWEST 155,805,000 Columbia Generating Station Electric Revenue Bonds, Series...

  15. Lynn Dahlberg, Director of Marketing, Williams Northwest Pipeline...

    Broader source: Energy.gov (indexed) [DOE]

    between the electric day, which starts at midnight in each time zone, and the uniform national gas day beginning at 9 am Central Clock Time (CCT). The FERC addressed...

  16. Workplace Charging Challenge Partner: Northwest Evaluation Association...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Northwest Evaluation Association (NWEA) Workplace Charging Challenge Partner: Northwest Evaluation Association (NWEA) Workplace Charging Challenge Partner: Northwest Evaluation ...

  17. Hydrogen Pipeline Working Group Workshop: Code for Hydrogen Pipelines

    Broader source: Energy.gov [DOE]

    Code for Hydrogen Piping and Pipelines. B31 Hydrogen Section Committee to develop a new code for H2 piping and pipelines.

  18. Hydrogen Pipelines | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Gaseous Hydrogen » Hydrogen Pipelines Hydrogen Pipelines Photo of a hydrogen pipeline. Gaseous hydrogen can be transported through pipelines much the way natural gas is today. Approximately 1,500 miles of hydrogen pipelines are currently operating in the United States. Owned by merchant hydrogen producers, these pipelines are located where large hydrogen users, such as petroleum refineries and chemical plants, are concentrated such as the Gulf Coast region. Transporting gaseous hydrogen via

  19. Aspen Pipeline | Open Energy Information

    Open Energy Info (EERE)

    navigation, search Name: Aspen Pipeline Place: Houston, Texas Zip: 77057 Product: US firm which acquires, builds and owns pipelines, gathering systems and distribution systems....

  20. PACIFIC NORTHWEST CYBER SUMMIT

    SciTech Connect (OSTI)

    Lesperance, Ann M.; Matlock, Gordon W.; Becker-Dippmann, Angela S.; Smith, Karen S.

    2013-08-07

    On March 26, 2013, the Snohomish County Public Utility District (PUD) and the U.S. Department of Energy’s (DOE’s) Pacific Northwest National Laboratory (PNNL) jointly hosted the Pacific Northwest Cyber Summit with the DOE’s Office of Electricity Delivery and Energy Reliability, the White House, Washington State congressional delegation, Washington State National Guard, and regional energy companies.

  1. Subsea pipeline connection

    SciTech Connect (OSTI)

    Langner, C. G.

    1985-09-17

    A method and apparatus are provided for connecting an offshore pipeline or flowline bundle to a deepwater subsea structure and then laying away from said structure. The pipeline or flowline bundle is deployed vertically from a pipelay vessel to make a hinged connection with the subsea structure. The connection operation is facilitated by a flowline connection tool attached to the pipeline or flowline bundle and designed to be inserted into a funnel located either centrally or to one side of the subsea structure. The connection procedure consists of landing and securing the flowline connection tool onto the subsea structure, then hinging over and connecting the pipeline or flowline bundle to the subsea structure as the pipeline or flowline bundle is laid on the seafloor beginning at the subsea structure.

  2. GAS PIPELINE PIGABILITY

    SciTech Connect (OSTI)

    Ted Clark; Bruce Nestleroth

    2004-04-01

    In-line inspection equipment is commonly used to examine a large portion of the long distance transmission pipeline system that transports natural gas from well gathering points to local distribution companies. A piece of equipment that is inserted into a pipeline and driven by product flow is called a ''pig''. Using this term as a base, a set of terms has evolved. Pigs that are equipped with sensors and data recording devices are called ''intelligent pigs''. Pipelines that cannot be inspected using intelligent pigs are deemed ''unpigable''. But many factors affect the passage of a pig through a pipeline, or the ''pigability''. The pigability pipeline extend well beyond the basic need for a long round hole with a means to enter and exit. An accurate assessment of pigability includes consideration of pipeline length, attributes, pressure, flow rate, deformation, cleanliness, and other factors as well as the availability of inspection technology. All factors must be considered when assessing the appropriateness of ILI to assess specific pipeline threats.

  3. EIA - Natural Gas Pipeline Network - Salt Cavern Storage Reservoir

    U.S. Energy Information Administration (EIA) Indexed Site

    Configuration Salt Cavern Storage Reservoir Configuration About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Salt Cavern Underground Natural Gas Storage Reservoir Configuration Salt Cavern Underground Natural Gas Storage Reservoir Configuration Source: PB Energy Storage Services Inc.

  4. EIA - Natural Gas Pipeline Network - Natural Gas Transportation Corridors

    U.S. Energy Information Administration (EIA) Indexed Site

    Map Corridors > Major U.S. Natural Gas Transportation Corridors Map About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Major U.S. Natural Gas Transportation Corridors, 2008

  5. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Nancy Porter; Mike Sullivan; Chris Neary

    2003-05-01

    The two broad categories of deposited weld metal repair and fiber-reinforced composite repair technologies were reviewed for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Preliminary test programs were developed for both deposited weld metal repairs and for fiber-reinforced composite repair. To date, all of the experimental work pertaining to the evaluation of potential repair methods has focused on fiber-reinforced composite repairs. Hydrostatic testing was also conducted on four pipeline sections with simulated corrosion damage: two with composite liners and two without.

  6. Natural Gas Market Centers and Hubs: A 2003 Update

    U.S. Energy Information Administration (EIA) Indexed Site

    Market Centers and Hubs: A 2003 Update EIA Home > Natural Gas > Natural Gas Analysis Publications Natural Gas Market Centers and Hubs: A 2003 Update Printer-Friendly Version "This special report looks at the current status of market centers/hubs in today's natural gas marketplace, examining their role and their importance to natural gas shippers, marketers, pipelines, and others involved in the transportation of natural gas over the North American pipeline network. Questions or

  7. * Systems update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    update * Edison update * NUG annual meeting * Queues and System Usage * User Survey results * Data ... - 21016 2015, Energy Sciences Network The Central ...

  8. Pipelines following exploration in deeper Gulf of Mexico

    SciTech Connect (OSTI)

    True, W.R.

    1988-07-04

    Gulf of Mexico pipeline construction has been falling of sharply to shallow-water (less than 300 ft) areas, while construction for middle depth (300 - 600 ft) and deepwater (600 + ft) areas as been holding steady. These trends are evident from analyses of 5-year data compiled by the U.S. Department of Interior (DOI) Minerals Management Service (MMS). This article continues a series of updates based on MMS gulf pipeline data (OGJ, June 8, 1987, p. 50). These installments track construction patterns in water depths, diameter classifications, and mileage. The figures are also evaluated in terms of pipeline-construction cost data published in Oil and Gas Journal's annual Pipeline Economics Reports.

  9. Pipeline integrity design for differential settlement in discontinuous permafrost areas

    SciTech Connect (OSTI)

    Zhou, Z.J.; Boivin, R.P.; Glover, A.G.; Kormann, P.J.

    1996-12-31

    The NOVA Gas Transmission Ltd. (NGTL) gas pipeline system is expanding northwards as the producers search for and find new gas reserves. This growth has taken the system into the discontinuous permafrost zone, and also into new design problems. One such problem is the structural integrity of a pipeline subjected to the settlement differentials that occur between frozen and unfrozen soils. Adequate integrity design for differential settlement is required by design codes, such as CSA Z662, but the procedures and criteria must be established by the pipeline designers. This paper presents the methodology of pipeline integrity design for differential settlements used on a number of pipeline projects in Northwest Alberta. Outlined in the paper are the procedures, rationales and models used to: (a) locate discontinuous permafrost; (b) quantify the potential differential settlement; (c) predict pipeline stresses and strains; (d) establish strain limits; and (e) determine the pipe wall thickness to withstand those potential differential settlements. Several design options are available and are briefly discussed. For the projects mentioned, the heavy wall pipe option was identified as a cost effective design for medium to large differential settlements.

  10. Rnnotator Assembly Pipeline

    SciTech Connect (OSTI)

    Martin, Jeff

    2010-06-03

    Jeff Martin of the DOE Joint Genome Institute discusses a de novo transcriptome assembly pipeline from short RNA-Seq reads on June 3, 2010 at the "Sequencing, Finishing, Analysis in the Future" meeting in Santa Fe, NM

  11. Energy Northwest, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the 1954 Code or Section 103 of the 1986 Code. See "TAX MATTERS" herein. 433,450,000 ENERGY NORTHWEST 311,245,000 Columbia Generating Station Electric Revenue Refunding Bonds,...

  12. Energy Northwest, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    minimum taxable income. See "TAX MATTERS-SERIES 2012-A BONDS" herein. 669,115,000 ENERgY NORThWEST 4,600,000 Columbia generating Station Electric Revenue Bonds, Series 2011-C...

  13. Hydrogen Pipeline Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pipeline Working Group Hydrogen Pipeline Working Group The Hydrogen Pipeline Working Group of research and industry experts focuses on issues related to the cost, safety, and ...

  14. Department of Transportation Pipeline and Hazardous Materials...

    Office of Environmental Management (EM)

    Transportation Pipeline and Hazardous Materials Safety Administration Activities Department of Transportation Pipeline and Hazardous Materials Safety Administration Activities...

  15. Northwest Ohio Final Report

    SciTech Connect (OSTI)

    Moyer, Kevin

    2015-03-04

    EXECUTIVE SUMMARY When the Toledo Lucas County Port Authority (TLCPA) filed for the Department of Energy EECBG grant in late 2009, it was part of a strategic and Board backed objective to expand the organization’s economic development and financing programs into alternative energy and energy efficiency. This plan was filed with the knowledge and support of the areas key economic development agencies. The City of Toledo was also a key partner with the Mayor designating a committee to develop a Strategic Energy Policy for the City. This would later give rise to a Community Sustainability Strategic Plan for Toledo, Lucas County and the surrounding region with energy efficiency as a key pillar. When the TLCPA signed the grant documents with the DOE in June of 2010, the geographic area was severely distressed economically, in the early stages of a recovery from over a 30% drop in business activity and high unemployment. The TLCPA and its partners began identifying potential project areas well before the filing of the application, continuing to work diligently before the formal award and signing of the grant documents. Strong implementation and actions plans and business and financing models were developed and revised throughout the 3 year grant period with the long term goal of creating a sustainable program. The TLCPA and the City of Toledo demonstrated early leadership by forming the energy improvement district and evaluating buildings under their control including transportation infrastructure and logistics, government services buildings and buildings which housed several for profit and not for profit tenants while completing significant energy efficiency projects that created public awareness and confidence and solid examples of various technologies and energy savings. As was stated in the DOE Award Summary, the undertaking was focused as a commercial program delving into Alternative Energy Utility Districts; what are referred to in Ohio Statute as Energy Special Improvement Districts or ESIDs and what is nationally known as Property Assessed Clean Energy or PACE districts and PACE financing. The project methodology followed the identify, develop, implement, monitor and measure format. These districts began in Toledo and adjoining areas and are expanding to TLCPA’s 28 county financing agency geographic footprint. What began as the Toledo Ohio Advanced Energy Improvement Corporation is now doing business as the Northwest Ohio Advanced Energy Improvement District recognizing it expansion into creating and financing other districts in NW Ohio. The program has been sought out as an advisor by major communities and states in the process of developing similar legislation and programs and has become one of the largest most successful PACE energy improvement and financing districts in the US. The program and the energy district focused on transforming energy use, delivery, conservation and renewable energy as “options of first choice”. The significant energy savings paid for many of the improvements and created a financially viable program well beyond the grant period. The program has become a model within the State of Ohio and Nationally on how to implement and finance projects in broad energy districts including how to evolve and integrate several financing methodologies. It is a unique utilization of revolving loan funds and energy bond pooling with revenue backing primarily from energy improvement special assessments on commercial properties along with some power purchase agreement (PPA) and loan agreement revenue. The program has also incorporated Qualified Energy Conservation Bonds, State of Ohio Energy Loans (SEP), utility rebates, solar and renewable energy certificates, renewable tax incentives and grants, and owner funded equity as additional program leverage and funding. Other keys to this success have been a continual simplification and refinement of the application and documentation process to make funding available easily and quickly to building owners when they are prepared to commit to the project as well as act as a trusted facilitator and advisor to both building owners and other stakeholders. Taking a flexible and pragmatic approach to project evaluation and implementation that matches time and expense to the complexity of the project has been another key learning. To date the program has closed 3 energy bond issues through the TLCPA sponsored and managed NW Ohio Bond Fund totaling $16.54 million (of which $3.34 million were QECB qualified). The program has turned over its $3.0 million revolving loan fund twice as construction financing in advance of bond issuance and currently has issued $1.25 million in revolving term loans. The program has $1.66 million of remaining capacity for QECB qualified bonds. The program can issue an additional $13.46 million in energy bonds continuing to utilize its DOE EECBG loan loss reserves. In addition, the program has available $3.6 million of loan loss reserves from the State of Ohio, as an eligible Port Authority, that can back the issuance of an additional $7.2 to $14.4 million of energy bonds. This does not include additional bond capacity is available from the NW Ohio Bond Fund. The program is the master escrow agent for $18 million of loan loss reserves from the State of Ohio for eligible Port Authorities that can be utilized to assist the formation of energy districts and financing programs in major metropolitan areas and regions around the State of Ohio. Other leveraged funds now total $10 million; placing the total project value completed and financed at over $30 million. In addition that program has generated an active pipeline of projects in various stages that total $25 – $30 million.

  16. New Materials for Hydrogen Pipelines

    Broader source: Energy.gov [DOE]

    Barriers to Hydrogen Delivery: Existing steel pipelines are subject to hydrogen embrittlement and are inadequate for widespread H2 distribution.

  17. UQ Pipeline Lorenz Portlet

    Energy Science and Technology Software Center (OSTI)

    2012-08-31

    This is web client software that can help initiate UQ Pipeline jobs on LLNL's LC compute systems and visually shows the status of such jobs in a browser window. The web client interacts with LC's interactive compute nodes using (LLNL) Lorenz REST API to initiate action and obtain status data in JSON format.

  18. Independent Oversight Activity Report, Pacific Northwest National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pacific Northwest National Laboratory - January 2014 Independent Oversight Activity Report, Pacific Northwest National Laboratory - January 2014 February 2014 PNNL Corrective...

  19. 1999 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1999-12-01

    The Pacific Northwest Loads and Resources Study (White Book) is published annually by BPA and establishes the planning basis for supplying electricity to customers. It serves a dual purpose. First, the White Book presents projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. Second, the White Book serves as a benchmark for annual BPA determinations made pursuant to its regional power sales contracts. Specifically, BPA uses the information in the White Book for determining the notice required when customers request to increase or decrease the amount of power purchased from BPA. The White Book will not be used in calculations for the 2002 regional power sales contract subscription process. The White Book compiles information obtained from several formalized resource planning reports and data submittals, including those from the Northwest Power Planning Council (Council) and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for determining BPA revenues. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions, including expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. In this loads and resources study, resource availability is compared with a medium forecast of electricity consumption. The forecasted future electricity demands--firm loads--are subtracted from the projected capability of existing and ''contracted for'' resources to determine whether BPA and the region will be surplus or deficit. If Federal system resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA may use or market to increase revenues. Conversely, if Federal system firm loads exceed available resources, there is a deficit of energy and/or capacity and BPA would add conservation or contract purchases as needed to meet its firm loads. The load forecast is derived by using econometric models and analysis to predict the loads that will be placed on electric utilities in the region. This study incorporates information on contract obligations and contract resources, combined with the resource capabilities obtained from public utility and investor-owned utility (IOU) customers through their annual data submittals to the PNUCC, from BPA's Firm Resource Exhibit (FRE Exhibit I) submittals, and through analysis of the Federal hydroelectric power system. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA) produced by the Pacific Northwest Coordinating Group. The PNCA defines the planning and operation of the regional hydrosystem. The 1999 White Book is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; and (2) a technical appendix (available electronically only) detailing the loads and resources for each major Pacific Northwest generating utility. This analysis updates the December 1998 Pacific Northwest Loads and Resources Study. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 2000-01 through 2009-10. The study shows the Federal system's and the region's monthly estimated maximum electricity demand, monthly energy demand, monthly energy generation, and monthly maximum generating capability--capacity--for OY 2000-01, 2004-05, and 2009-10. The Federal system and regional monthly capacity surplus/deficit projections are summarized for 10 operating years. This document analyzes the Pacific Northwest's projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system, which includes loads and resources in addition to the Federal system.

  20. EIA - Natural Gas Pipeline Network - Natural Gas Market Centers and Hubs

    U.S. Energy Information Administration (EIA) Indexed Site

    Market Centers and Hubs About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Market Centers and Hubs in Relation to Major Natural Gas Transportation Corridors, 2009 Natural Gas Market Centers and Hubs in Relation to Major Natural Gas Transportation Corridors, 2009 DCP = DCP Midstream Partners LP; EPGT = Enterprise Products Texas Pipeline Company. Note: The relative widths of the various transportation corridors are based

  1. EIA - Natural Gas Pipeline Network - Major Natural Gas Transportation

    U.S. Energy Information Administration (EIA) Indexed Site

    Corridors Natural Gas Transportation Corridors About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Major Natural Gas Transportation Corridors Corridors from the Southwest | From Canada | From Rocky Mountain Area | Details about Transportation Corridors The national natural gas delivery network is intricate and expansive, but most of the major transportation routes can be broadly categorized into 11 distinct corridors or flow

  2. EIA - Natural Gas Pipeline Network - Underground Natural Gas Storage

    U.S. Energy Information Administration (EIA) Indexed Site

    Facilities Map LNG Peak Shaving and Import Facilities Map About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates U.S. LNG Peaking Shaving and Import Facilities, 2008 U.S. LNG Peak Shaving and Import Facilities, 2008 The EIA has determined that the informational map displays here do not raise security concerns, based on the application of the Federal Geographic Data Committee's Guidelines for Providing Appropriate Access to Geospatial

  3. EIA - Natural Gas Pipeline Network - Underground Natural Gas Storage

    U.S. Energy Information Administration (EIA) Indexed Site

    Facilities Map U.S. Underground Natural Gas Storage Facilities Map About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates U.S. Underground Natural Gas Storage Facilities, Close of 2007 more recent map U.S. Underground Natural Gas Storage Facilities, 2008 The EIA has determined that the informational map displays here do not raise security concerns, based on the application of the Federal Geographic Data Committee's Guidelines for

  4. Instrumented Pipeline Initiative

    SciTech Connect (OSTI)

    Thomas Piro; Michael Ream

    2010-07-31

    This report summarizes technical progress achieved during the cooperative agreement between Concurrent Technologies Corporation (CTC) and U.S. Department of Energy to address the need for a for low-cost monitoring and inspection sensor system as identified in the Department of Energy (DOE) National Gas Infrastructure Research & Development (R&D) Delivery Reliability Program Roadmap.. The Instrumented Pipeline Initiative (IPI) achieved the objective by researching technologies for the monitoring of pipeline delivery integrity, through a ubiquitous network of sensors and controllers to detect and diagnose incipient defects, leaks, and failures. This report is organized by tasks as detailed in the Statement of Project Objectives (SOPO). The sections all state the objective and approach before detailing results of work.

  5. Questions and Issues on Hydrogen Pipelines: Pipeline Transmission of Hydrogen

    Broader source: Energy.gov [DOE]

    Pipping of GH2 Pipeline. Background: FG 64 built in 50ies, KP added in 70ies, active mining area over total length

  6. Workforce Pipeline | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Daily Herald True Romance: From walking opposite paths to following the same route Dallas Morning News Workforce Pipeline Argonne seeks to attract, hire and retain a diverse ...

  7. Hydrogen Embrittlement in Pipeline Steels

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Applied Chemicals & Materials Division Material Measurement Laboratory HYDROGEN EMBRITTLEMENT IN PIPELINE STEELS AJ Slifka, ES Drexler, RL Amaro, DS Lauria, JR Fekete Applied ...

  8. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    are required to evaluate pipelines in these areas for safety threats such as corrosion, repair or replace defective segments, and reassess their pipeline at least every 7...

  9. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    the Cheyenne Hub in Weld County, Colorado, to the ANR Pipeline delivery point in Brown County, Kansas, and includes delivery points with pipeline systems owned by Kinder...

  10. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    more from the system than they nominate. Other pipeline companies, such as CenterPoint Energy Gas Transmission Company and Southern Star Central Gas Pipeline Corporation, both...

  11. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    that had been in place since February 1. Other pipeline companies, such as CenterPoint Energy Gas Transmission Company and Southern Star Central Gas Pipeline Corporation, both...

  12. Heart of America Northwest

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FOIA request to USDOE from Heart of America NW 1 Freedom of Information Act (FOIA) Request Heart of America Northwest 444 NE Ravenna Blvd., St. #406 Seattle, WA 98115 (206) 382-1014; office@hoanw.org June 18, 2015 Dorothy Riehle RL/ORP Freedom of Information and Privacy Act Officer U.S. Department of Energy P.O. Box 550 Richland, Washington 99352 Email: dorothy.riehle@rl.gov; dorothy_c_riehle@rl.gov FOIA Request regarding Leaking Single Shell Tanks Dear Ms. Riehle, On behalf of Heart of America

  13. Pacific Northwest National Laboratory

    Broader source: Energy.gov [DOE]

    The Newberry Geothermal Energy team seeks to establish the FORGE site at Newberry Volcano. The region surrounding the proposed site, along with its geothermal and EGS potential, was previously explored and researched by participating members of the Newberry Geothermal Energy team, and the understanding and data gathered with those efforts provide the scientific foundation for establishing a potential FORGE site. The team brings together the scientific research and management experience of the Pacific Northwest National Laboratory with the research, educational, and outreach experience of Oregon State University, and the industry and EGS experience of AltaRock Energy, Inc.

  14. Natural Gas Market Centers and Hubs: A 2003 Update

    U.S. Energy Information Administration (EIA) Indexed Site

    Market Centers and Hubs: A 2003 Update Energy Information Administration - October 2003 1 This special report looks at the current status of market centers/hubs in today=s natural gas marketplace, examining their role and their importance to natural gas shippers, marketers, pipelines, and others involved in the transportation of natural gas over the North American pipeline network. Questions or comments on the contents of this article should be directed to James Tobin at james.tobin@eia.doe.gov

  15. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Bill Bruce; Nancy Porter; George Ritter; Matt Boring; Mark Lozev; Ian Harris; Bill Mohr; Dennis Harwig; Robin Gordon; Chris Neary; Mike Sullivan

    2005-07-20

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. In lieu of a field installation on an abandoned pipeline, a preliminary nondestructive testing protocol is being developed to determine the success or failure of the fiber-reinforced liner pipeline repairs. Optimization and validation activities for carbon-fiber repair methods are ongoing.

  16. Northwest SEED | Open Energy Information

    Open Energy Info (EERE)

    SEED Jump to: navigation, search Name: Northwest Sustainable Energy for Economic Development (SEED) Address: 1402 3rd Ave. Suite 901 Place: Seattle, WA Zip: 98101 Phone Number:...

  17. 2003 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2003-12-01

    The Pacific Northwest Loads and Resources Study (White Book), which is published annually by the Bonneville Power Administration (BPA), establishes one of the planning bases for supplying electricity to customers. The White Book contains projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. The White Book also contains information obtained from formalized resource planning reports and data submittals including those from individual utilities, the Northwest Power and Conservation Council (Council), and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for determining BPA revenues, although the database that generates the data for the White Book analysis contributes to the development of BPA's inventory and ratemaking processes. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions that include expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. In this loads and resources study, resource availability is compared to an expected level of total retail electricity consumption. The forecasted annual energy electricity retail load plus contract obligations are subtracted from the sum of the projected annual energy capability of existing resources and contract purchases to determine whether BPA and/or the region will be surplus or deficit. Surplus energy is available when resources are greater than loads. This energy could be marketed to increase revenues. Deficits occur when resources are less than loads. Energy deficits could be met by any combination of the following: better-than-critical water conditions, demand-side management and conservation programs, permanent loss of a load (i.e., due to economic conditions or closures), additional contract purchases, and/or new generating resources. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA). The PNCA defines the planning and operation of seventeen U.S. Pacific Northwest utilities and other parties with generating facilities within the region's hydroelectric (hydro) system. The hydroregulation study used for the 2003 White Book incorporates measures from the National Oceanographic and Atmospheric Administration Fisheries (NOAA Fisheries) Biological Opinion dated December 2000, and the U.S. Fish and Wildlife Service's 2000 Biological Opinion (2000 FCRPS BiOps) for the Snake River and Columbia River projects. These measures include: (1) Increased flow augmentation for juvenile fish migrations in the Snake and Columbia rivers in the spring and summer; (2) Mandatory spill requirements at the Lower Snake and Columbia dams to provide for non-turbine passage routes for juvenile fish migrants; and (3) Additional flows for Kootenai River white sturgeon in the spring. The hydroregulation criteria for this analysis includes: an updated Detailed Operation Plan for Treaty reservoirs for Operating Year (OY) 2004, updated PNCA planning criteria for OY 2003, and revised juvenile fish bypass spill levels for 2000 FCRPS BiOps implementation. The 2003 White Book is presented in two documents: (1) this summary document of Federal system and PNW region loads and resources, and (2) a technical appendix which presents regional loads, grouped by major PNW utility categories, and detailed contract and resource information. The technical appendix is available only in electronic form. Individual customer information regarding marketer contracts is not detailed due to confidentiality agreements. The 2003 White Book analysis updates the December 2002 White Book. This analysis projects the yearly average energy consumption and resource availability

  18. 1982 worldwide pipeline construction will top 21,900 miles, $9. 5 billion

    SciTech Connect (OSTI)

    Hall, D.

    1982-07-01

    Reports that pipeline construction slowed slightly in 1982 because of lowered economic activity worldwide, with an upturn forecast for 1983. Explains that need for new pipelines to transport increasing amounts of oil and gas energy now being discovered, plus use of pipelines to transport other commodities in increasing amounts, has created a backlog of demand for facilities. Indicates that commodities suited for pipeline transport and getting consideration include crude oil; refined products; natural gas liquids; LPG; coal slurries; carbon dioxide (used for enhanced oil recovery); chemicals such as ammonia, ethane, ethylene, and similar petrochemical feedstocks; industrial gases such as oxygen, nitrogen; and solids slurries such as ores, wood chips, and other non-soluble minerals, even items such as wood chips and wood pulp for paper-making. Reveals that there are 10,396 miles of coal slurry pipeline planned for the US and 500 miles in Canada. Major US projects underway in the gas pipeline field include the 797-mile, 36-in. Trailblazer system in Nebraska, Wyoming, Colorado, and Utah. Products/ LPG/NGL pipelines underway include 105 miles of dual 4 and 6-in. line in Kansas. Crude pipeline activity includes 100 miles of 12-in. in California and 80 miles of 4 thru 40-in. in Alaska on the North Slope. Updates plans in Canada, Scotland, Denmark, Ireland, France, the Middle East, Australia, Southeast Asia, Mexico, South America and the USSR.

  19. "Changing Natural Gas Pipeline Throughputs in Canada"

    U.S. Energy Information Administration (EIA) Indexed Site

    Changing Natural Gas Pipeline Throughputs in Canada" Presented at 2015 EIA Energy Conference June 15, 2015 Margaret Skwara, National Energy Board Abha Bhargava, National Energy Board * National Energy Board Act * LNG Export and Import Licence Applications (summary and links to LNG export licence applications) * Market Snapshots (energy information updates; weekly updates) * Energy Futures Report (long term projections of supply and demand; Nov 2015 new release) * Regulatory Document Index

  20. Pacific Northwest Government Contracting Conference

    Broader source: Energy.gov [DOE]

    The Government Contract Assistance Program (GCAP) and Pacific Northwest Defense Coalition (PNDC) cordially invite you to attend our annual Pacific Northwest Government Contracting Conference. The 2015 conference offers a full day of robust and informative training, coupled with networking opportunities. Attendees will learn from seasoned professionals and receive training specifically tailored to companies pursuing the government marketplace.

  1. Pacific Northwest Site Office Jobs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Administration Pacific Northwest National Laboratory WSU Mechanical Engineering students unveil their solutions to help PNNL researchers with nonproliferation and international safeguards work Pacific Northwest National Laboratory (PNNL) has partnered with Washington State University students for the past seven years to develop new instruments, tools, and methods to support nonproliferation and international safeguards. The students unveiled their latest designs last month in Richland,...

  2. EIS-0164: Pacific Gas Transmission/Pacific Gas and Electric and Altamont Natural Gas Pipeline Project

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission (FERC) has prepared the PGT/PG&E and Altamont Natural Gas Pipeline Projects Environmental Impact Statement to satisfy the requirements of the National Environmental Policy Act. This project addresses the need to expand the capacity of the pipeline transmission system to better transfer Canadian natural gas to Southern California and the Pacific Northwest. The U.S. Department of Energy cooperated in the preparation of this statement because Section 19(c) of the Natural Gas Act applies to the Department’s action of authorizing import/export of natural gas, and adopted this statement by the spring of 1992. "

  3. Weatherization Update

    Energy Savers [EERE]

    Weatherization Update NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Objectives & Overview Presentation Objectives: * Brief background on the program * Update on New Initiatives for Weatherization Overview 1. Background 2. ARRA - Expanded provisions 3. Expansion of Traditional Service 4. Training & Technical Assistance Plan NATIONAL RENEWABLE ENERGY LABORATORY

  4. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    over the next few days. To avoid penalties, Northwest requested that customers stay within their scheduled volumes, and asked customers who owe gas to Northwest north of...

  5. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

    2004-08-17

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. Development of a comprehensive test plan for this process is recommended for use in the field trial portion of this program.

  6. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

    2004-12-31

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. The first round of optimization and validation activities for carbon-fiber repairs are complete. Development of a comprehensive test plan for this process is recommended for use in the field trial portion of this program.

  7. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; Nancy Porter; Mike Sullivan; Chris Neary

    2004-04-12

    The two broad categories of deposited weld metal repair and fiber-reinforced composite liner repair technologies were reviewed for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Preliminary test programs were developed for both deposited weld metal repair and for fiber-reinforced composite liner repair. Evaluation trials have been conducted using a modified fiber-reinforced composite liner provided by RolaTube and pipe sections without liners. All pipe section specimens failed in areas of simulated damage. Pipe sections containing fiber-reinforced composite liners failed at pressures marginally greater than the pipe sections without liners. The next step is to evaluate a liner material with a modulus of elasticity approximately 95% of the modulus of elasticity for steel. Preliminary welding parameters were developed for deposited weld metal repair in preparation of the receipt of Pacific Gas & Electric's internal pipeline welding repair system (that was designed specifically for 559 mm (22 in.) diameter pipe) and the receipt of 559 mm (22 in.) pipe sections from Panhandle Eastern. The next steps are to transfer welding parameters to the PG&E system and to pressure test repaired pipe sections to failure. A survey of pipeline operators was conducted to better understand the needs and performance requirements of the natural gas transmission industry regarding internal repair. Completed surveys contained the following principal conclusions: (1) Use of internal weld repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling (HDD) when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) Pipe diameter sizes range from 50.8 mm (2 in.) through 1,219.2 mm (48 in.). The most common size range for 80% to 90% of operators surveyed is 508 mm to 762 mm (20 in. to 30 in.), with 95% using 558.8 mm (22 in.) pipe. An evaluation of potential repair methods clearly indicates that the project should continue to focus on the development of a repair process involving the use of GMAW welding and on the development of a repair process involving the use of fiber-reinforced composite liners.

  8. Northwest Biodiesel Network | Open Energy Information

    Open Energy Info (EERE)

    Biodiesel Network Jump to: navigation, search Logo: Northwest Biodiesel Network Name: Northwest Biodiesel Network Address: 6532 Phinney Ave N Place: Seattle, Washington Zip: 98103...

  9. Northwest Missouri Biofuels LLC | Open Energy Information

    Open Energy Info (EERE)

    Missouri Biofuels LLC Jump to: navigation, search Name: Northwest Missouri Biofuels, LLC Place: St Joseph, Missouri Sector: Biofuels Product: Northwest Missouri Biofuels operates a...

  10. Independent Oversight Review, Pacific Northwest National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pacific Northwest National Laboratory - September 2013 September 2013 Review of the Fire Protection Program at Pacific Northwest National Laboratory and the Fire Suppression...

  11. Renewable Northwest Project | Open Energy Information

    Open Energy Info (EERE)

    Project Jump to: navigation, search Logo: Renewable Northwest Project Name: Renewable Northwest Project Address: 917 SW Oak St, Ste 303 Place: Portland, Oregon Zip: 97205 Region:...

  12. Geothermal pipeline: Progress and development update geothermal progress monitor

    SciTech Connect (OSTI)

    1994-03-01

    This two-hour conference will provide information for audiences of school officials, designers, utility personnel, and others interested in economical, energy-efficient, and environmentally beneficial heating and cooling for schools. The April 28, 1994 teleconference will focus on applications of GHPs in school buildings, including elementary, secondary, and post-secondary schools. Program content will include case studies of successful GHP installations in a number of different building types and climates as well as interviews with designers, school administrators, and technical experts. Emphasis will be on the comfort, flexibility, economy, ease of maintenance, and other benefits of GHPs in schools. There will be opportunity for downsite participants to telephone questions to GHP authorities, experienced school administrators, designers, and installers who will be in the teleconference studio. This document also discusses a new funding cycle of the Geothermal Energy Program by the California Energy Commission and a shared energy savings project which recently received funding from the Corps of Engineers in Fort Polk, Louisiana.

  13. BP and Hydrogen Pipelines | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BP and Hydrogen Pipelines BP and Hydrogen Pipelines BP Environmental Commitment: Green corporate philosophy and senior management commitment PDF icon hpwgw_bp_yoho.pdf More Documents & Publications Proceedings of the 2005 Hydrogen Pipeline Working Group Workshop EIS-0018: Final Environmental Impact Statement Hydrogen permeability and Integrity of hydrogen transfer pipelines

  14. Global warming: A Northwest perspective

    SciTech Connect (OSTI)

    Scott, M.J.; Counts, C.A.

    1990-02-01

    The Northwest Power Planning Council convened a symposium in Olympia, Washington, on the subject of global climate change ( the greenhouse effect'') and its potential for affecting the Pacific Northwest. The symposium was organized in response to a need by the Power Council to understand global climate change and its potential impacts on resource planning and fish and wildlife planning for the region, as well as a need to understand national policy developing toward climate change and the Pacific Northwest's role in it. 40 figs., 15 tabs.

  15. 1998 Pacific Northwest Loads and Resources Study: The White Book.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1998-12-01

    The Pacific Northwest Loads and Resources Study (White Book) is published annually by BPA and establishes the planning basis for supplying electricity to customers. It serves a dual purpose. First, the White Book presents projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. Second, the White Book serves as a benchmark for annual BPA determinations made pursuant to the 1981 regional power sales contracts. Specifically, BPA uses the information in the White Book for determining the notice required when customers request to increase or decrease the amount of power purchased from BPA. The White Book compiles information obtained from several formalized resource planning reports and data submittals, including those from the Northwest Power Planning Council (Council) and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for inventory planning to determine BPA revenues. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions, including expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. The 1998 White Book is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; and (2) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. This analysis updates the December 1997 Pacific Northwest Loads and Resources Study.

  16. New Materials for Hydrogen Pipelines

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation by 08-Smith to DOE Hydrogen Pipeline R&D Project Review Meeting held January 5-6, 2005 at Oak Ridge National Laboratory in Oak Ridge, Tennessee.

  17. Fatigue analysis for submarine pipelines

    SciTech Connect (OSTI)

    Celant, M.; Re, G.; Venzi, S.

    1982-01-01

    The techniques used in fatigue life forecasts for a submarine pipeline, which have been worked out during the design of the Transmediterranean Pipeline, are presented. The stress level imposed by supports configuration, pipeline weight and weight-pressure-temperature of the internal fluid, is increased further by cyclic loads of sensible extent, resulting from hydroelastic phenomena of interaction between spanning pipe and seabottom current; the synchronization between the characteristic frequencies of vortex-shedding and the natural frequencies of the spans provokes cyclic loading which affect negatively the fatigue life of the pipeline. The results of this research have affected the design choices from the operations of route selection; in particular, they were aiming at the determination of the intervention works on the sea bottom before pipelaying, and the possible installation of overweights or pipe supports in order to avoid free spans of unacceptable length, and at the determination of the interval between periodic inspection.

  18. Pipelines programming paradigms: Prefab plumbing

    SciTech Connect (OSTI)

    Boeheim, C.

    1991-08-01

    Mastery of CMS Pipelines is a process of learning increasingly sophisticated tools and techniques that can be applied to your problem. This paper presents a compilation of techniques that can be used as a reference for solving similar problems

  19. About U.S. Natural Gas Pipelines

    Reports and Publications (EIA)

    2007-01-01

    This information product provides the interested reader with a broad and non-technical overview of how the U.S. natural gas pipeline network operates, along with some insights into the many individual pipeline systems that make up the network. While the focus of the presentation is the transportation of natural gas over the interstate and intrastate pipeline systems, information on subjects related to pipeline development, such as system design and pipeline expansion, are also included.

  20. User Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Edison and Cori: User Update - 1 - Zhengji Zhao, Helen He, Wahid Bhimji NERSC User Group Meeting Berkeley, CA, March 24, 2016 Edison Update - 2 - Zhengji Zhao Edison upgrades (11/30/2015-3/15) * Edison move 11/30-12/23/2015 - Edison disassembled, reassembled, integrated, reconfigured and tested at CRT - 1/4/2016 users were enabled - Free charging period 1/4 - 1/10/2016 * Switch to Slurm - Slurm configuraDon has been in conDnuous improvement and adjustment - Users needed a lot of help with

  1. 2013 White Book, Pacific Northwest Loads and Resources Study (summary)

    SciTech Connect (OSTI)

    2013-10-01

    The 2013 Pacific Northwest Loads and Resources Study (2013 White Book) is BPA's latest projection of the Pacific Northwest regional retail loads, contract obligations, contract purchases, and resource capabilities. The 2013 White Book is a snapshot of conditions as of October 1, 2013, documenting the loads and resources for the Federal system and region for the 10-year study period OY 2014 through 2023. The White Book contains projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. The White Book also contains information obtained from formalized resource planning reports and data submittals including those from individual utilities, the Northwest Power and Conservation Council (Council), and the Pacific Northwest Utilities Conference Committee (PNUCC). Starting with the 2012 White Book, BPA changed the annual production schedule for future White Books. BPA is scheduled to publish a complete White Book, which includes a Federal System Needs Assessment analysis, every other year (even years). In the odd-numbered years, BPA will publish a biennial summary update (Supplement) that only contains major changes to the Federal System and Regional System analyses that have occurred since the last White Book. http://www.bpa.gov/power/pgp/whitebook/2013/index.shtml.

  2. Workplace Charging Challenge Partner: Northwest Evaluation Association

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (NWEA) | Department of Energy Northwest Evaluation Association (NWEA) Workplace Charging Challenge Partner: Northwest Evaluation Association (NWEA) Workplace Charging Challenge Partner: Northwest Evaluation Association (NWEA) Joined the Challenge: July 2015 Headquarters: Portland, OR Charging Location: Portland, OR Domestic Employees: 400 Northwest Evaluation Association (NWEA) encourages and supports many forms of public and personal sustainable transportation modes. Workplace charging is

  3. Hydrogen permeability and Integrity of hydrogen transfer pipelines...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    permeability and Integrity of hydrogen transfer pipelines Hydrogen permeability and Integrity of hydrogen transfer pipelines Presentation by 03-Babu for the DOE Hydrogen Pipeline ...

  4. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    of the Alaska gas pipeline. The opening of ANWR might reduce the gas resource risk of building an Alaska gas pipeline, as the area has an estimated 3.6 trillion cubic...

  5. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In the Midwest, Horizon pipeline received approval to begin construction of a 70-mile pipeline from Joliet, IL north to McHenry, IL. When completed, the project will add...

  6. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    has been out of service since November 14. The pipeline reported that it continues to test the pipeline prior to placing it back into service. The total number of rotary rigs...

  7. Mapco's NGL Rocky Mountain pipeline

    SciTech Connect (OSTI)

    Isaacs, S.F.

    1980-01-01

    The Rocky Mountain natural gas liquids (NGL) pipeline was born as a result of major producible gas finds in the Rocky Mountain area after gas deregulation. Gas discoveries in the overthurst area indicated considerable volumes of NGL would be available for transportation out of the area within the next 5 to 7 years. Mapco studied the need for a pipeline to the overthrust, but the volumes were not substantial at the time because there was little market and, consequently, little production for ethane. Since that time crude-based products for ethylene manufacture have become less competitive as a feed product on the world plastics market, and ethane demand has increased substantially. This change in the market has caused a major modification in the plans of the NGL producers and, consequently, the ethane content of the NGL stream for the overthrust area is expected to be 30% by volume at startup and is anticipated to be at 45% by 1985. These ethane volumes enhance the feasibility of the pipeline. The 1196-mile Rocky Mountain pipeline will be installed from the existing facility in W. Texas, near Seminole, to Rock Springs, Wyoming. A gathering system will connect the trunk line station to various plant locations. The pipeline development program calls for a capacity of 65,000 bpd by the end of 1981.

  8. BPA Committed to Northwest Values

    SciTech Connect (OSTI)

    2010-09-01

    The Columbia River has been called the “crown jewel” of the Pacific Northwest. There is no question it is among the region’s greatest assets — supplying low-cost clean hydropower, making deserts bloom thanks to irrigation and providing navigation, recreation and a home for many species of fish and wildlife. The Bonneville Power Administration is proud to be a steward of this great resource. Our mission is to serve the people and environment of the Pacific Northwest. We sell wholesale power from Grand Coulee Dam and 30 other Northwest federal dams to Northwest utilities, including public utility districts, rural electric cooperatives and municipal utility departments, as well as investor-owned utilities. We operate three-fourths of the region’s high voltage transmission system that delivers that power. But, as a federal agency, we are not just a power marketer. We have public responsibilities that include, among many, promoting energy efficiency, facilitating development of renewable power, protecting fish and wildlife affected by hydro development, honoring treaty obligations to tribes and promoting a reliable energy future through collaboration and partnerships. This document describes our responsibilities to citizens in the Pacific Northwest.

  9. 2006 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2006-03-01

    The Pacific Northwest Loads and Resources Study (White Book), which is published annually by the Bonneville Power Administration (BPA), establishes one of the planning bases for supplying electricity to customers. The White Book contains projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. The White Book also contains information obtained from formalized resource planning reports and data submittals including those from individual utilities, the Northwest Power and Conservation Council (Council), and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for determining BPA revenues, although the database that generates the data for the White Book analysis contributes to the development of BPA's inventory and ratemaking processes. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions that include expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. The load resource balance of both the Federal system and the region is determined by comparing resource availability to an expected level of total retail electricity consumption. Resources include projected energy capability plus contract purchases. Loads include a forecast of retail obligations plus contract obligations. Surplus energy is available when resources are greater than loads. This surplus energy could be marketed to increase revenues. Energy deficits occur when resources are less than loads. These energy deficits will be met by any combination of the following: better-than-critical water conditions, demand-side management and conservation programs, permanent loss of loads due to economic conditions or closures, additional contract purchases, and/or the addition of new generating resources. This study incorporates information on Pacific Northwest (PNW) regional retail loads, contract obligations, and contract resources. This loads and resources analysis simulates the operation of the power system in the PNW. The simulated hydro operation incorporates plant characteristics, streamflows, and non-power requirements from the current Pacific Northwest Coordination Agreement (PNCA). Additional resource capability estimates were provided by BPA, PNW Federal agency, public agency, cooperative, U.S. Bureau of Reclamation (USBR), and investor-owned utility (IOU) customers furnished through annual PNUCC data submittals for 2005 and/or direct submittals to BPA. The 2006 White Book is presented in two documents: (1) this summary document of Federal system and PNW region loads and resources, and (2) a technical appendix which presents regional loads, grouped by major PNW utility categories, and detailed contract and resource information. The technical appendix is available only in electronic form. Individual customer information for marketer contracts is not detailed due to confidentiality agreements. The 2006 White Book analysis updates the 2004 White Book. This analysis shows projections of the Federal system and region's yearly average annual energy consumption and resource availability for the study period, OY 2007-2016. The study also presents projections of Federal system and region expected 1-hour monthly peak demand, monthly energy demand, monthly 1-hour peak generating capability, and monthly energy generation for OY 2007, 2011, and 2016. BPA is investigating a new approach in capacity planning depicting the monthly Federal system 120-hour peak generating capability and 120-hour peak surplus/deficit for OY 2007, 2011, and 2016. This document analyzes the PNW's projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger PNW regional power system loads and resources that include the Federal system as well other PNW entities.

  10. EIA - Natural Gas Pipeline Network - Natural Gas Import/Export Locations

    U.S. Energy Information Administration (EIA) Indexed Site

    List Pipelines > Import/Export Location List About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Currently, there are 58 locations at which natural gas can be exported or imported into the United States, including 9 LNG (liquefied natural gas) facilities in the continental United States and Alaska (There is a tenth U.S. LNG import facility located in Puerto Rico). At 28 of these locations natural gas or LNG currently can only

  11. EIA - Natural Gas Pipeline Network - Natural Gas Import/Export Locations

    U.S. Energy Information Administration (EIA) Indexed Site

    Map Export Pipelines > Import/Export Locations Map About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates U.S. Natural Gas Import/Export Locations, as of the end of 2008 Natural Gas Import and Export Locations Source: Energy Information Administration, Office of Oil and Gas, Natural Gas Division, Imports/Export Points Database. The EIA has determined that the informational map displays here do not raise security concerns, based

  12. Method and system for pipeline communication

    DOE Patents [OSTI]

    Richardson; John G.

    2008-01-29

    A pipeline communication system and method includes a pipeline having a surface extending along at least a portion of the length of the pipeline. A conductive bus is formed to and extends along a portion of the surface of the pipeline. The conductive bus includes a first conductive trace and a second conductive trace with the first and second conductive traces being adapted to conformally couple with a pipeline at the surface extending along at least a portion of the length of the pipeline. A transmitter for sending information along the conductive bus on the pipeline is coupled thereto and a receiver for receiving the information from the conductive bus on the pipeline is also couple to the conductive bus.

  13. Northwest Save Energy Now Industrial Energy Efficiency Initiative...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Northwest Save Energy Now Industrial Energy Efficiency Initiative Northwest Save Energy Now Industrial Energy Efficiency Initiative Map highlighting Northwest states: Oregon, ...

  14. EIA - Natural Gas Pipeline Network - Largest Natural Gas Pipeline...

    U.S. Energy Information Administration (EIA) Indexed Site

    Gulf South Pipeline Co. Southeast, Southwest Southwest AL, FL, LA, MS, TX, GM 676 6,260 6,886 El Paso Natural Gas Co. Western, Southwest Southwest AZ, CO, NM, TX 1,638 6,182 10,302 ...

  15. Kinder Morgan Central Florida Pipeline Ethanol Project

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    KINDER MORGAN CENTRAL FLORIDA PIPELINE ETHANOL PROJECT  In December 2008, Kinder Morgan began transporting commercial batches of denatured ethanol along with gasoline shipments in its 16-inch Central Florida Pipeline (CFPL) from Tampa to Orlando, making CFPL the first transmarket gasoline pipeline in the United States to do so. The 16-inch pipeline previously only transported regular and premium gasoline.  Kinder Morgan invested approximately $10 million to modify the line for ethanol

  16. California Natural Gas Pipelines: A Brief Guide

    SciTech Connect (OSTI)

    Neuscamman, Stephanie; Price, Don; Pezzola, Genny; Glascoe, Lee

    2013-01-22

    The purpose of this document is to familiarize the reader with the general configuration and operation of the natural gas pipelines in California and to discuss potential LLNL contributions that would support the Partnership for the 21st Century collaboration. First, pipeline infrastructure will be reviewed. Then, recent pipeline events will be examined. Selected current pipeline industry research will be summarized. Finally, industry acronyms are listed for reference.

  17. OMAE 1993: Proceedings. Volume 5: Pipeline technology

    SciTech Connect (OSTI)

    Yoon, M.; Murray, A.; Thygesen, J.

    1993-01-01

    This volume of conference proceedings is volume five of a five volume series dealing with offshore and arctic pipeline, marine riser, platforms, and ship design and engineering. This volume is a result of increased use of pipeline transportation for oil, gas, and liquid products and the resultant need for lower design and operating costs. Papers in this conference cover topics on environmental considerations, pipeline automation, computer simulation techniques, materials testing, corrosion protection, permafrost problems, pipeline integrity, geotechnical concerns, and offshore engineering problems.

  18. Pacific Northwest Climate Science Conference | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pacific Northwest Climate Science Conference Pacific Northwest Climate Science Conference November 4, 2015 8:30AM PST to November 5, 2015 5:30PM PST Coeur d'Alene, Idaho The...

  19. Washington Update

    Energy Savers [EERE]

    April 11, 2012 Federal Energy Management Program femp.energy.gov 2 1. Status of Federal Goals 2. Presidential Memo * Key provisions * Role of UESCs * Agency commitments 3. Meeting Memo's Goals * New Programs * Financing * Reporting and Resources 4. FEMP Update 5. Mark Your Calendar: GovEnergy 2012 Agenda Federal Energy Management Program femp.energy.gov 3 $169 $181 $291 $281 $335 $469 $1,081 $3,544 $2,565 $122 $54 $92 $70 $139 $110 $142 $64 $165 $429 $36 $123 $314 $166 $356 $457 $563 $369 $0

  20. ESnet Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ESnet Update Winter 2008 Joint Techs Workshop Joe Burrescia ESnet General Manager January 21, 2008 Energy Sciences Network Lawrence Berkeley National Laboratory Networking for the Future of Science 2 TWC SNLL YUCCA MT PNNL LIGO I N E E L LANL SNLA Allied Signal ARM KCP NOAA OSTI ORAU SRS JLAB PPPL Lab DC Offices MIT ANL BNL FNAL AMES N R E L LLNL GA DOE-ALB OSC GTN NNSA International (high speed) 10 Gb/s SDN core 10G/s IP core 2.5 Gb/s IP core MAN rings (≥ 10 G/s) Lab supplied links OC12 ATM

  1. Program Update

    Energy Savers [EERE]

    5 issue of the U.S. Department of Energy (DOE) Offce of Legacy Management (LM) Program Update. This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to lm@hq.doe.gov. January-March 2015 Visit us at http://energy.gov/lm/ Goal 4 Successful Transition from Mound Site to Mound Business Park Continues The Mound Business Park attracts a variety of businesses to the former U.S. Department of Energy (DOE) Mound, Ohio, Site in Miamisburg. In

  2. Seismic assessment of buried pipelines

    SciTech Connect (OSTI)

    Al-Chaar, G.; Brady, P.; Fernandez, G.

    1995-12-31

    A structure and its lifelines are closely linked because the disruption of lifeline systems will obstruct emergency service functions that are vitally needed after an earthquake. As an example of the criticality of these systems, the Association of Bay Area Government (ABAG) recorded thousands of leaks in pipelines that resulted in more than twenty million gallons of hazardous materials being released in several recorded earthquakes. The cost of cleaning the spills from these materials was very high. This information supports the development of seismic protection of lifeline systems. The US Army Corps of Engineers Construction Engineering Research Laboratories (USACERL) has, among its missions, the responsibility to develop seismic vulnerability assessment procedures for military installations. Within this mission, a preliminary research program to assess the seismic vulnerability of buried pipeline systems on military installations was initiated. Phase 1 of this research project resulted in two major studies. In the first, evaluating current procedures to seismically design or evaluate existing lifeline systems, the authors found several significant aspects that deserve special consideration and need to be addressed in future research. The second was focused on identifying parameters related to buried pipeline system vulnerability and developing a generalized analytical method to relate these parameters to the seismic vulnerability assessment of existing pipeline systems.

  3. SDAV Viz July Progress Update: LANL

    SciTech Connect (OSTI)

    Sewell, Christopher Meyer

    2012-07-30

    SDAV Viz July Progress Update: (1) VPIC (Vector Particle in Cell) Kinetic Plasma Simulation Code - (a) Implemented first version of an in-situ adapter based on Paraview CoProcessing Library, (b) Three pipelines: vtkDataSetMapper, vtkContourFilter, vtkPistonContour, (c) Next, resolve issue at boundaries of processor domains; add more advanced viz/analysis pipelines; (2) Halo finding/merger trees - (a) Summer student Wathsala W. from University of Utah is working on data-parallel halo finder algorithm using PISTON, (b) Timo Bremer (LLNL), Valerio Pascucci (Utah), George Zagaris (Kitware), and LANL people are interested in using merger trees for tracking the evolution of halos in cosmo simulations; discussed possible overlap with work by Salman Habib and Katrin Heitmann (Argonne) during their visit to LANL 7/11; (3) PISTON integration in ParaView - Now available from ParaView github.

  4. Now Available: Pacific Northwest Smart Grid Demonstration Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pacific Northwest Smart Grid Demonstration Project - Technology Performance Report Volume 1 Now Available: Pacific Northwest Smart Grid Demonstration Project - Technology ...

  5. Updates | Department of Energy

    Office of Environmental Management (EM)

    blog is updated every time a significant update is made to the Communication Standards Web site. On this page, you can sign up to be notified by email when the blog is updated,...

  6. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    weeks heat dome, the Northeast saw significant price spikes during the week. The prime example is Transcontinental Pipelines Zone 6 point for delivery into New York...

  7. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    Price movements were stronger in the Rockies during the week owing to pipeline maintenance in the San Juan Basin that cut supply routes from the region. Before a...

  8. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    and Maritimes & Northeast Pipeline) are requiring shippers in their Northeast market area to either stay on rate or run positive imbalances starting Tuesday until further notice....

  9. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    areas along their systems and have written their respective pipeline integrity management programs. The second step required by the OPS rules requires inspection of all...

  10. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    prices using spot prices from producing areas, plus an allowance for interstate natural gas pipeline and local distribution company charges to transport the gas to market. Such a...

  11. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    operations. For example, it can test the thickness and roundness; and detect leaks, corrosion, and many other defects along the interior of a pipeline. Available capacity at the...

  12. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    in the Rockies may have resulted from transportation constraints attributable to maintenance on several compressor stations on the Rockies Express Pipeline (REX) in Colorado,...

  13. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    planning information that will assist in maintaining the operational integrity and reliability of pipeline service, as well as providing gas-fired power plant operators with...

  14. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    34 pipelines. Over this period, capacity release volumes receiving prices over the price cap were 2 percent of total capacity release volumes. Capacity release volumes and prices...

  15. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    for employees who report hazardous situations to outside authorities, and expanded involvement of States in pipeline oversight. Summary: Warmer-than-normal temperatures in many...

  16. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    Nevada) per MMBtu yesterday. In the Rockies, completion of a scheduled pipeline hydro-test ended significant transportation constraints in this region and prices responded to the...

  17. Capsule injection system for a hydraulic capsule pipelining system

    DOE Patents [OSTI]

    Liu, Henry

    1982-01-01

    An injection system for injecting capsules into a hydraulic capsule pipelining system, the pipelining system comprising a pipeline adapted for flow of a carrier liquid therethrough, and capsules adapted to be transported through the pipeline by the carrier liquid flowing through the pipeline. The injection system comprises a reservoir of carrier liquid, the pipeline extending within the reservoir and extending downstream out of the reservoir, and a magazine in the reservoir for holding capsules in a series, one above another, for injection into the pipeline in the reservoir. The magazine has a lower end in communication with the pipeline in the reservoir for delivery of capsules from the magazine into the pipeline.

  18. US pipelines report mixed results for 1993

    SciTech Connect (OSTI)

    True, W.R.

    1994-11-21

    US natural gas pipelines started 1994 in generally better conditions than a year earlier. These companies' operational and financial results for 1993 indicate modest but continuing improvement. Petroleum liquids pipelines, on the other hand, suffered reduced revenues and incomes last: increased deliveries and trunkline movement of liquid petroleum products failed fully to offset fewer barrels of crude oil moving through the companies' pipeline systems. Revenues, incomes, mileage operated, and other data are tracked in Oil and Gas Journal's exclusive Economics Report. Additionally, this report contains extensive data on actual costs of pipeline construction compared with what companies expected to spend at the time of projects' approvals. The paper also discusses the continuing shift of natural gas pipelines as merchants to role of transporter; what was spent; the US interstate network; pipeline mileage; deliveries; the top 10 companies; construction activities; cost trends; and cost components.

  19. Buried pipelines in large fault movements

    SciTech Connect (OSTI)

    Wang, L.J.; Wang, L.R.L.

    1995-12-31

    Responses of buried pipelines in large fault movements are examined based upon a non-linear cantilever beam analogy. This analogy assumes that the pipeline in a large deflection zone behaves like a cantilever beam under a transverse-concentrated shear at the inflection point with a uniformly distributed soil pressure along the entire span. The tangent modulus approach is adopted to analyze the coupled axial force-bending moment interaction on pipeline deformations in the inelastic range. The buckling load of compressive pipeline is computed by the modified Newmark`s numerical integration scheme. Parametric studies of both tensile and compressive pipeline responses to various fault movements, pipeline/fault crossing angles, soil/pipe friction angles, buried depths, pipe diameters and thickness are investigated. It is shown by the comparisons that previous findings were unconservative.

  20. News and Updates

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News and Updates Next Cleanroom Training to be announced NEWS: Article published in Louisiana Technology Guide

  1. Pipeline Safety Research, Development and Technology

    Energy Savers [EERE]

    Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Safety Research, Development and Technology Natural Gas Infrastructure R&D and Methane Emissions Mitigation Workshop Nov 2014 U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Thank You! * We appreciate the opportunity to share! * Much to share about DOT natural gas infrastructure R&D * Many facets to the fugitive methane issue * DOT/DOE - We would like to restart the

  2. Acoustic system for communication in pipelines

    DOE Patents [OSTI]

    Martin, II, Louis Peter; Cooper, John F.

    2008-09-09

    A system for communication in a pipe, or pipeline, or network of pipes containing a fluid. The system includes an encoding and transmitting sub-system connected to the pipe, or pipeline, or network of pipes that transmits a signal in the frequency range of 3-100 kHz into the pipe, or pipeline, or network of pipes containing a fluid, and a receiver and processor sub-system connected to the pipe, or pipeline, or network of pipes containing a fluid that receives said signal and uses said signal for a desired application.

  3. Composites Technology for Hydrogen Pipelines | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Investigate application of composite, fiber-reinforced polymer pipeline technology for hydrogen transmission and distribution PDF icon pipelinegroupsmithms.pdf More Documents & ...

  4. Department of Transportation Pipeline and Hazardous Materials...

    Office of Environmental Management (EM)

    Bulk Packaging Placarding Requirements - Placarding of Packages vs. Placarding Vehicle * LSASCO Scenarios - 7 - U.S. Department of Transportation Pipeline and Hazardous Materials...

  5. Colonial Pipeline Company Timothy C. Felt

    Broader source: Energy.gov (indexed) [DOE]

    United States - a 370 million dollar pipeline that would deliver gasoline and other ... Those words remain true to this day - infrastructure projects that are designed to serve ...

  6. Computer Science and Information Technology Student Pipeline

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science and Information Technology Student Pipeline Program Description Los Alamos ... Students are provided a mentor and challenging projects to demonstrate their capabilities ...

  7. GLAST (FERMI) Data-Processing Pipeline

    SciTech Connect (OSTI)

    Flath, Daniel L.; Johnson, Tony S.; Turri, Massimiliano; Heidenreich, Karen A.; /SLAC

    2011-08-12

    The Data Processing Pipeline ('Pipeline') has been developed for the Gamma-Ray Large Area Space Telescope (GLAST) which launched June 11, 2008. It generically processes graphs of dependent tasks, maintaining a full record of its state, history and data products. The Pipeline is used to automatically process the data down-linked from the satellite and to deliver science products to the GLAST collaboration and the Science Support Center and has been in continuous use since launch with great success. The pipeline handles up to 2000 concurrent jobs and in reconstructing science data produces approximately 750GB of data products using 1/2 CPU-year of processing time per day.

  8. Clean Development Mechanism Pipeline | Open Energy Information

    Open Energy Info (EERE)

    Clean Development Mechanism Pipeline AgencyCompany Organization: UNEP-Risoe Centre, United Nations Environment Programme Sector: Energy, Land Topics: Finance, Implementation,...

  9. Northwest Arctic Sustainable Energy Projects

    Energy Savers [EERE]

    Prov. Conference 2015 Northwest Arctic Sustainable Energy Projects * Efficient * Sustainable * Resilient & * Able to Adapt Whaling Crew Whale or Seal blubber lamp Energy Efficient Coordination 1900 - 1980 Oil for Power 2004 ACIA We are releasing energy into our environment that has been buried for millions of years. 30 years of Ice loss Low oil price NAB Fuel Prices September 9, 2015 Gasoline/G Stove Oil/G Propane/23G Kwh (1-500) KwH (500-700) Kotzebue $5.99 $5.65 $198.28 $0.18 $0.45 Ambler

  10. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    accepting requests starting Wednesday, January 18, for interruptible storage at its Jackson Prairie Storage facility. Northwest noted that if it becomes necessary to utilize...

  11. 2004 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2004-12-01

    The Pacific Northwest Loads and Resources Study (White Book), which is published annually by the Bonneville Power Administration (BPA), establishes one of the planning bases for supplying electricity to customers. The White Book contains projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. The White Book also contains information obtained from formalized resource planning reports and data submittals including those from individual utilities, the Northwest Power and Conservation Council (Council), and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for determining BPA revenues, although the database that generates the data for the White Book analysis contributes to the development of BPA's inventory and ratemaking processes. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions that include expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. The load resource balance of BPA and/or the region is determined by comparing resource availability to an expected level of total retail electricity consumption. Resources include projected energy capability plus contract purchases. Loads include a forecast of retail obligations plus contract obligations. Surplus energy is available when resources are greater than loads. This energy could be marketed to increase revenues. Energy deficits occur when resources are less than loads. These deficits could be met by any combination of the following: better-than-critical water conditions, demand-side management and conservation programs, permanent loss of loads due to economic conditions or closures, additional contract purchases, and/or the addition of new generating resources. The loads and resources analysis in this study simulates the operation of the power system under the current Pacific Northwest Coordination Agreement (PNCA). The PNCA defines the planning and operation of seventeen U.S. Pacific Northwest utilities and other parties with generating facilities within the region's hydroelectric (hydro) system. The hydroregulation study used for the 2004 White Book incorporates measures from the National Oceanographic and Atmospheric Administration Fisheries (NOAA Fisheries) Biological Opinion dated December 2000, and the U.S. Fish and Wildlife Service's 2000 Biological Opinion (2000 FCRPS BiOps) for the Snake River and Columbia River projects. These measures include: (1) Increased flow augmentation for juvenile fish migrations in the Snake and Columbia rivers in the spring and summer; (2) Mandatory spill requirements at the Lower Snake and Columbia dams to provide for non-turbine passage routes for juvenile fish migrants; and (3) Additional flows for Kootenai River white sturgeon in the spring; The hydroregulation criteria for this analysis includes the following: (1) Detailed Operation Plan operation for Treaty reservoirs for Operating Year (OY) 2004; (2) PNCA planning criteria for OY 2004; and (3) Juvenile fish bypass spill levels for 2000 FCRPS BiOps implementation. The 2004 White Book is presented in two documents: (1) this summary document of Federal system and PNW region loads and resources, and (2) a technical appendix which presents regional loads, grouped by major PNW utility categories, and detailed contract and resource information. The technical appendix is available only in electronic form. Individual customer information for marketer contracts is not detailed due to confidentiality agreements. The 2004 White Book analysis updates the 2003 White Book. This analysis projects the yearly average energy consumption and resource availability for the study period, OY 2006 through 2015. The study shows the Federal system's and the region's expected monthly peak demand, monthly energy demand, monthly peak generating capability, and monthly energy generation for OY 2006, 2010, and 2015. The Federal system and regional monthly capacity surplus/deficit projections are summarized for the 10 operating years of the study period. This document analyzes the PNW's projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger PNW regional power system loads and resources that include the Federal system as well other PNW entities.

  12. Northwest Hydraulic Consultants | Open Energy Information

    Open Energy Info (EERE)

    Hydraulic Consultants Jump to: navigation, search Hydro | Hydrodynamic Testing Facilities Name Northwest Hydraulic Consultants Address 835 S 192nd, Building C, Suite 1300 Place...

  13. Thompson named VP of Northwest Requirements Marketing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Thompson-named-VP-of-Northwest-Requirements-Marketing Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand...

  14. Northwest Piscataquis, Maine: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Northwest Piscataquis, Maine: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 46.1101801, -69.383351 Show Map Loading map......

  15. Independent Oversight Review, Pacific Northwest National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    conducted May 15-17, 2012, at the Department of Energy's (DOE) Pacific Northwest National Laboratory by the DOE Office of Safety and Emergency Management Evaluations, which is...

  16. BPA, Energy Northwest launch demand response pilot

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BPA-Energy-Northwest-launch-demand-response-pilot Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand...

  17. Bonneville Power Administration, Oregon Energy Northwest, Washington...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bonneville Power Administration, Oregon Energy Northwest, Washington; Wholesale Electric Primary Credit Analyst: David N Bodek, New York (1) 212-438-7969; david.bodek@standardandpo...

  18. Pacific Northwest National Laboratory - Reservoir Stimulation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a string of significant recognitions and accomplishments for Dr. Carlos Fernandez and his team from Pacific Northwest National Laboratory (PNNL) for their GTO-funded research in...

  19. Science Frontiers Pacific Northwest National Laboratory (PNNL...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science Frontiers Pacific Northwest National Laboratory (PNNL), a U.S. Department of Energy Office of Science Laboratory, is pushing the frontiers of science in areas that are ...

  20. Pacific Northwest National Laboratory Grounds Maintenance

    SciTech Connect (OSTI)

    2009-08-05

    FEMP Water Efficiency Best Management Practice #4 and #5: Case study overview of the grounds maintenance program for Pacific Northwest National Laboratory.

  1. Lighting Market Study: Illuminating the Northwest Efficiency

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lighting Market Study: Illuminating the Northwest Efficiency Community Summer 2014 through Winter 2015 Research Manager: Carrie Cobb, clcobb@bpa.gov, 503-230-4985 The lighting...

  2. Northwest Energy Angel Group | Open Energy Information

    Open Energy Info (EERE)

    Northwest providing investment capital, strategic advice and mentoring to early-stage clean energy companies. Coordinates: 47.60356, -122.329439 Show Map Loading map......

  3. Addressing the workforce pipeline challenge

    SciTech Connect (OSTI)

    Leonard Bond; Kevin Kostelnik; Richard Holman

    2006-11-01

    A secure and affordable energy supply is essential for achieving U.S. national security, in continuing U.S. prosperity and in laying the foundations to enable future economic growth. To meet this goal the next generation energy workforce in the U.S., in particular those needed to support instrumentation, controls and advanced operations and maintenance, is a critical element. The workforce is aging and a new workforce pipeline, to support both current generation and new build has yet to be established. The paper reviews the challenges and some actions being taken to address this need.

  4. 2007 Hydrogen Pipeline Working Group Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Hydrogen Pipeline Working Group Workshop 2007 Hydrogen Pipeline Working Group Workshop The Department of Energy (DOE) Hydrogen Pipeline Working Group met Sept. 25-26, 2007, to review the progress and results of DOE-sponsored pipeline research and development (R&D) projects. More than 30 researchers and industry representatives shared their research results and discussed the current challenges and future goals for hydrogen pipeline R&D. One of the Pipeline Working Group's near-term

  5. LPO Updates | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Updates LPO Updates LPO Updates Subscribe to LPO Updates Enter your email to receive periodic updates and announcements from LPO. You may unsubscribe at any time. Email: Subscribe Past LPO Updates LPO Update, 2-Feb-2016: Download as a PDF | View online LPO Update, 17-Dec-2015: Download as a PDF | View online LPO Update, 22-Oct-2015: Download as a PDF | View online LPO Update, 25-Aug-2015: Download as a PDF | View online LPO Update, 19-Aug-2015: Download as a PDF | View online LPO Update,

  6. Changes in the Pipeline Transportation Market

    Reports and Publications (EIA)

    1999-01-01

    This analysis assesses the amount of capacity that may be turned back to pipeline companies, based on shippers' actions over the past several years and the profile of contracts in place as of July 1, 1998. It also examines changes in the characteristics of contracts between shippers and pipeline companies.

  7. Algeria LPG pipeline is build by Bechtel

    SciTech Connect (OSTI)

    Horner, C.

    1984-08-01

    The construction of the 313 mile long, 24 in. LPG pipeline from Hassi R'Mel to Arzew, Algeria is described. The pipeline was designed to deliver 6 million tons of LPG annually using one pumping station. Eventually an additional pumping station will be added to raise the system capacity to 9 million tons annually.

  8. Rio Grande pipeline introduces LPG to Mexico

    SciTech Connect (OSTI)

    1997-06-01

    Rio Grande Pipeline, a joint venture between Mid-America Pipeline Co., Amoco Pipeline Co. and Navajo Pipeline Co., has broken new ground in the energy industry as the first LPG pipeline to cross the US-Mexico border. Plans for the project were announced in November 1995 and first deliveries started three months ago on March 21, 1997. The 8-inch, 265-mile pipeline originates near Odessa, TX, where it receives an 85-15 propane-butane mix via a connection to Mid-America Pipeline. From Odessa, product moves west through the Texas desert and crosses the Rio Grande River about 15 miles south of El Paso near Clint, TX and extends 20 miles into Mexico. Capacity of the line is 24,000 bpd and it has been averaging about 22,000 bpd since line-fill. All in all, it sounded like a reasonably feasible, routine project. But perceptions can be deceiving, or at least misleading. In other words, the project can be summarized as follows: one river, two cultures and a world of difference. The official border crossing for pipeline construction took place on Dec. 2, 1996, with a directional drill under the Rio Grande River, but in actuality, the joint venture partners were continually bridging differences in language, laws, customs and norms with Pemex and contracted workers from Mexico.

  9. Natural Gas Pipeline and System Expansions

    Reports and Publications (EIA)

    1997-01-01

    This special report examines recent expansions to the North American natural gas pipeline network and the nature and type of proposed pipeline projects announced or approved for construction during the next several years in the United States. It includes those projects in Canada and Mexico that tie in with U.S. markets or projects.

  10. The Sloan Digital Sky Survey Monitor Telescope Pipeline (Journal...

    Office of Scientific and Technical Information (OSTI)

    The Sloan Digital Sky Survey Monitor Telescope Pipeline Citation Details In-Document Search Title: The Sloan Digital Sky Survey Monitor Telescope Pipeline You are accessing a...

  11. Penitas, TX Natural Gas Pipeline Imports From Mexico (Dollars...

    U.S. Energy Information Administration (EIA) Indexed Site

    Penitas, TX Natural Gas Pipeline Imports From Mexico (Dollars per Thousand Cubic Feet) Penitas, TX Natural Gas Pipeline Imports From Mexico (Dollars per Thousand Cubic Feet) Decade ...

  12. Alamo, TX Natural Gas Pipeline Imports From Mexico (Dollars per...

    U.S. Energy Information Administration (EIA) Indexed Site

    Alamo, TX Natural Gas Pipeline Imports From Mexico (Dollars per Thousand Cubic Feet) Alamo, TX Natural Gas Pipeline Imports From Mexico (Dollars per Thousand Cubic Feet) Decade ...

  13. Minnesota Natural Gas Pipeline and Distribution Use (Million...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    (Million Cubic Feet) Minnesota Natural Gas Pipeline and Distribution Use (Million Cubic ... Natural Gas Pipeline & Distribution Use Minnesota Natural Gas Consumption by End Use ...

  14. Minnesota Natural Gas Pipeline and Distribution Use Price (Dollars...

    Gasoline and Diesel Fuel Update (EIA)

    Price (Dollars per Thousand Cubic Feet) Minnesota Natural Gas Pipeline and Distribution ... Price for Natural Gas Pipeline and Distribution Use Minnesota Natural Gas Prices Price for ...

  15. DOE Hydrogen Pipeline Working Group Workshop | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pipeline Working Group Workshop DOE Hydrogen Pipeline Working Group Workshop Only those systems that are regulated by DOT in the US, DOT delegated state agency, or other federal ...

  16. December 4, 2007: NETL's Robotic Pipeline Inspection Tool

    Broader source: Energy.gov [DOE]

    December 4, 2007The Department's National Energy Technology Laboratory announces the development of a new robotic pipeline inspection tool that could revolutionize the pipeline inspection process....

  17. Assessing Steel Pipeline and Weld Susceptibility to Hydrogen...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessing Steel Pipeline and Weld Susceptibility to Hydrogen Embrittlement Webinar Assessing Steel Pipeline and Weld Susceptibility to Hydrogen Embrittlement Webinar Access the ...

  18. Assessment of the Adequacy of Natural Gas Pipeline Capacity in...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment of the Adequacy of Natural Gas Pipeline Capacity in the Northeast United States - November 2013 Assessment of the Adequacy of Natural Gas Pipeline Capacity in the ...

  19. Evalutation of Natural Gas Pipeline Materials and Infrastructure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Evalutation of Natural Gas Pipeline Materials and Infrastructure for HydrogenMixed Gas Service Evalutation of Natural Gas Pipeline Materials and Infrastructure for HydrogenMixed ...

  20. EIA - Natural Gas Pipeline Network - Regional Overview and Links

    U.S. Energy Information Administration (EIA) Indexed Site

    ... Interstate - Pipeline systems that cross one or more States Intrastate - Pipeline systems that operate only within State boundaries Network Design - Basic concepts and parameters ...

  1. EIS-0501: Golden Pass LNG Export and Pipeline Project, Texas...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Golden Pass LNG Export and Pipeline Project, Texas and Louisiana EIS-0501: Golden Pass LNG Export and Pipeline Project, Texas and Louisiana Summary The Federal Energy Regulatory ...

  2. Panel 2, Hydrogen Delivery in the Natural Gas Pipeline Network

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    30 years) > Transmission Pipelines 6-10 billion per year Over 10 million hp of installed compression capacity > Local Distribution Pipelines 12 billion year > 8.2 ...

  3. Hydrogen Permeability and Integrity of Hydrogen Delivery Pipelines...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Permeability and Integrity of Hydrogen Delivery Pipelines Hydrogen Permeability and Integrity of Hydrogen Delivery Pipelines Project Objectives: To gain basic understanding of ...

  4. Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Barriers: Hydrogen embrittlement of pipelines and remediation (mixing with water vapor?) ... Causes and Remediation Hydrogen permeability and Integrity of hydrogen transfer pipelines

  5. Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presentation by 09-Sofronis to DOE Hydrogen Pipeline R&D Project Review Meeting held ... More Documents & Publications Hydrogen Embrittlement of Pipeline Steels: Causes and ...

  6. Hydrogen Delivery Technologies and Systems- Pipeline Transmission of Hydrogen

    Broader source: Energy.gov [DOE]

    Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen. Design and operations standards and materials for hydrogen and natural gas pipelines.

  7. Failure modes for pipelines in landslide areas

    SciTech Connect (OSTI)

    Bruschi, R.; Spinazze, M.; Tomassini, D.; Cuscuna, S.; Venzi, S.

    1995-12-31

    In recent years a number of incidences of pipelines affected by slow soil movements have been reported in the relevant literature. Further related issues such as soil-pipe interaction have been studied both theoretically and through experimental surveys, along with the environmental conditions which are responsible for hazard to the pipeline integrity. A suitable design criteria under these circumstances has been discussed by several authors, in particular in relation to a limit state approach and hence a strain based criteria. The scope of this paper is to describe the failure mechanisms which may affect the pipeline in the presence of slow soil movements impacting on the pipeline, both in the longitudinal and transverse direction. Particular attention is paid to environmental, geometric and structural parameters which steer the process towards one or other failure mechanism. Criteria for deciding upon remedial measures required to guarantee the structural integrity of the pipeline, both in the short and in the long term, are discussed.

  8. U.S. interstate pipelines ran more efficiently in 1994

    SciTech Connect (OSTI)

    True, W.R.

    1995-11-27

    Regulated US interstate pipelines began 1995 under the momentum of impressive efficiency improvements in 1994. Annual reports filed with the US Federal Energy Regulatory Commission (FERC) show that both natural-gas and petroleum liquids pipeline companies increased their net incomes last year despite declining operating revenues. This article discusses trends in the pipeline industry and gives data on the following: pipeline revenues, incomes--1994; current pipeline costs; pipeline costs--estimated vs. actual; current compressor construction costs; compressor costs--estimated vs. actual; US interstate mileage; investment in liquids pipelines; 10-years of land construction costs; top 10 interstate liquids pipelines; top 10 interstate gas pipelines; liquids pipeline companies; and gas pipeline companies.

  9. Pipeline Decommissioning Trial AWE Berkshire UK - 13619

    SciTech Connect (OSTI)

    Agnew, Kieran

    2013-07-01

    This Paper details the implementation of a 'Decommissioning Trial' to assess the feasibility of decommissioning the redundant pipeline operated by AWE located in Berkshire UK. The paper also presents the tool box of decommissioning techniques that were developed during the decommissioning trial. Constructed in the 1950's and operated until 2005, AWE used a pipeline for the authorised discharge of treated effluent. Now redundant, the pipeline is under a care and surveillance regime awaiting decommissioning. The pipeline is some 18.5 km in length and extends from AWE site to the River Thames. Along its route the pipeline passes along and under several major roads, railway lines and rivers as well as travelling through woodland, agricultural land and residential areas. Currently under care and surveillance AWE is considering a number of options for decommissioning the pipeline. One option is to remove the pipeline. In order to assist option evaluation and assess the feasibility of removing the pipeline a decommissioning trial was undertaken and sections of the pipeline were removed within the AWE site. The objectives of the decommissioning trial were to: - Demonstrate to stakeholders that the pipeline can be removed safely, securely and cleanly - Develop a 'tool box' of methods that could be deployed to remove the pipeline - Replicate the conditions and environments encountered along the route of the pipeline The onsite trial was also designed to replicate the physical prevailing conditions and constraints encountered along the remainder of its route i.e. working along a narrow corridor, working in close proximity to roads, working in proximity to above ground and underground services (e.g. Gas, Water, Electricity). By undertaking the decommissioning trial AWE have successfully demonstrated the pipeline can be decommissioned in a safe, secure and clean manor and have developed a tool box of decommissioning techniques. The tool box of includes; - Hot tapping - a method of breaching the pipe while maintaining containment to remove residual liquids, - Crimp and shear - remote crimping, cutting and handling of pipe using the excavator - Pipe jacking - a way of removing pipes avoiding excavations and causing minimal disturbance and disruption. The details of the decommissioning trial design, the techniques employed, their application and effectiveness are discussed and evaluated here in. (authors)

  10. An Update and Status Report of the Mergedsounding VAP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    An Update and Status Report of the Mergedsounding VAP Troyan, David Brookhaven National Laboratory Jensen, Michael Brookhaven National Laboratory Miller, Mark Brookhaven National Laboratory Delamere, Jennifer Atmospheric and Environmental Research, Inc. Mlawer, Eli Atmospheric & Environmental Research, Inc. Turner, David University of Wisconsin-Madison Mather, James Pacific Northwest National Laboratory Mace, Gerald University of Utah Category: Atmospheric State and Surface The past year saw

  11. Super Boiler Update

    SciTech Connect (OSTI)

    2007-10-01

    This presentation from the 2007 American Boiler Manufacturers Association Manufacturers Conference provides an update of the First Generation Super Boiler.

  12. Rapid Threat Organism Recognition Pipeline

    Energy Science and Technology Software Center (OSTI)

    2013-05-07

    The RAPTOR computational pipeline identifies microbial nucleic acid sequences present in sequence data from clinical samples. It takes as input raw short-read genomic sequence data (in particular, the type generated by the Illumina sequencing platforms) and outputs taxonomic evaluation of detected microbes in various human-readable formats. This software was designed to assist in the diagnosis or characterization of infectious disease, by detecting pathogen sequences in nucleic acid sequence data from clinical samples. It has alsomore » been applied in the detection of algal pathogens, when algal biofuel ponds became unproductive. RAPTOR first trims and filters genomic sequence reads based on quality and related considerations, then performs a quick alignment to the human (or other host) genome to filter out host sequences, then performs a deeper search against microbial genomes. Alignment to a protein sequence database is optional. Alignment results are summarized and placed in a taxonomic framework using the Lowest Common Ancestor algorithm.« less

  13. EIS-0433: Keystone XL Pipeline

    Broader source: Energy.gov [DOE]

    The proposed Keystone XL project consists of a 1,700-mile crude oil pipeline and related facilities that would primarily be used to transport Western Canadian Sedimentary Basin crude oil from an oil supply hub in Alberta, Canada to delivery points in Oklahoma and Texas. This EIS, prepared by the Department of State, evaluates the environmental impacts of the proposed Keystone XL project. DOE’s Western Area Power Administration, a cooperating agency, has jurisdiction over certain proposed transmission facilities (construction and operation of a short 230-kv transmission line and construction of a new substation). The State Department published a notice in the Federal Register on February 3, 2012, regarding the denial of the Keystone XL presidential permit (77 FR 5614).

  14. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    to shippers who deliver more than 110 percent of their actual usage into the pipeline system. Pacific Gas and Electric Company declared a systemwide stage 2 high-inventory...

  15. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    where daily price changes varied between 0.37 and 2.21 per MMBtu. A combination of maintenance and pipeline-expansion related outages significantly curtailed options for...

  16. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Monday, March 29. Questar Pipeline issued a reminder to customers that a reservoir test at its Clay Basin storage facility in Utah began on Wednesday, March 24 and is expected...

  17. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    and interest owners of a scheduled shut-in so that the pipeline can conduct a test at the Bear Creek Storage Field in Louisiana from October 23 through 29, 2007. The...

  18. Rock the Watt: An Energy Conservation Campaign at Pacific Northwest...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rock the Watt: An Energy Conservation Campaign at Pacific Northwest National Lab Rock the Watt: An Energy Conservation Campaign at Pacific Northwest National Lab Case study ...

  19. Natural Innovative Renewable Energy formerly Northwest Iowa Renewable...

    Open Energy Info (EERE)

    Innovative Renewable Energy formerly Northwest Iowa Renewable Energy Jump to: navigation, search Name: Natural Innovative Renewable Energy (formerly Northwest Iowa Renewable...

  20. Design method addresses subsea pipeline thermal stresses

    SciTech Connect (OSTI)

    Suman, J.C.; Karpathy, S.A. )

    1993-08-30

    Managing thermal stresses in subsea pipelines carrying heated petroleum requires extensive thermal-stress analysis to predict trouble spots and to ensure a design flexible enough to anticipate stresses and expansions. Explored here are various methods for resolving predicaments posed by thermal loads and resulting deformations by keeping the stresses and deformations in the pipeline system within allowable limits. The problems posed by thermal stresses are not unique; the solutions proposed here are. These methods are based on recent work performed for a major Asian subsea pipeline project currently under construction.

  1. Pipeline transportation of heavy crude oil

    SciTech Connect (OSTI)

    Kessick, M.A.; St. Denis, C.E.

    1982-08-10

    Heavy crude oils are transported by pipeline from deposit location to a remote upgrading location by emulsifying the crude oil using deaerated sodium hydroxide solution, conveying the oilin-water emulsion through the pipeline, and recovery of the oil from the oil-in-water emulsion by inverting the emulsion and dewatering the resulting water-in-oil emulsion. The emulsion inversion may be effected using slaked lime, resulting in recovery of a substantial proportion of the sodium hydroxide used in the initial emulsification. The sodium hydroxide solution may be recycled by a separate pipeline for reuse or treated for discharge.

  2. Middleware for Astronomical Data Analysis Pipelines

    SciTech Connect (OSTI)

    Abdulla, G; Liu, D; Garlick, J; Miller, M; Nikolaev, S; Cook, K; Brase, J

    2005-01-26

    In this paper the authors describe the approach to research, develop, and evaluate prototype middleware tools and architectures. The developed tools can be used by scientists to compose astronomical data analysis pipelines easily. They use the SuperMacho data pipelines as example applications to test the framework. they describe their experience from scheduling and running these analysis pipelines on massive parallel processing machines. they use MCR a Linux cluster machine with 1152 nodes and Luster parallel file system as the hardware test-bed to test and enhance the scalability of the tools.

  3. Otay Mesa, CA Natural Gas Imports by Pipeline from Mexico

    Gasoline and Diesel Fuel Update (EIA)

    0 0 1,717 0 0 0 2007-2014 Pipeline Prices -- -- 3.55 -- --

  4. 1993 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1993-12-01

    The Loads and Resources Study is presented in three documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; (2) a technical appendix detailing forecasted Pacific Northwest economic trends and loads, and (3) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. In this loads and resources study, resource availability is compared with a range of forecasted electricity consumption. The forecasted future electricity demands -- firm loads -- are subtracted from the projected capability of existing and {open_quotes}contracted for{close_quotes} resources to determine whether Bonneville Power Administration (BPA) and the region will be surplus or deficit. If resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA can sell to increase revenues. Conversely, if firm loads exceed available resources, there is a deficit of energy and/or capacity, and additional conservation, contract purchases, or generating resources will be needed to meet load growth. The Pacific Northwest Loads and Resources Study analyzes the Pacific Northwest`s projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system, which includes loads and resource in addition to the Federal system. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA) produced by the Pacific Northwest Coordinating Group. This study presents the Federal system and regional analyses for five load forecasts: high, medium-high, medium, medium-low, and low. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 1994--95 through 2003--04.

  5. Streamnet; Northwest Aquatic Information Network, 2002 Annual Report.

    SciTech Connect (OSTI)

    Schmidt, Bruce

    2003-02-07

    A primary focus of the StreamNet project in FY-02 was maintenance and update of ongoing data types. Significant progress was made toward updating data for the primary data categories in the StreamNet regional database. Data updates had been slowed in previous years due to the time required for conversion of georeferencing for most data types from the 1:250,000 scale River Reach Number (RRN) system to the 1:100,000 Longitude-Latitude Identifier (LLID) system. In addition, data relating to Protected Areas and Smolt Density Model results, the last data sets in the StreamNet database still in the 1:250,000 RRN format, were converted this year to the LLID system, making them available through the on-line Web Query System. The Protected Areas data were also made available through an on-line interactive mapping application. All routine project activities continued, including project administration at the full project and cooperating project levels, project management through the StreamNet Steering Committee, maintenance of databases and Internet data delivery systems, and providing data related services to the Northwest Power Planning Council's (NWPPC) Fish and Wildlife Program. As part of system management, a new web server was put in operation, significantly improving speed and reliability of Internet data delivery. The web based data query system was modified to utilize ColdFusion, in preparation for a full conversion to ColdFusion from the custom programming in Delphi. This greatly increased flexibility and the ability to modify query system function, correct errors, and develop new query capabilities. All project participants responded to numerous requests for information (data, maps, technical assistance, etc.) throughout the year. A significant accomplishment this year was resolution of long standing differences in how fish distribution is defined and presented. By focusing strictly on definitions related to current distribution (ignoring potential and historic distribution for the time being), all project participants were able to reach agreement. This now makes it possible to update anadromous distribution and habitat use data and to also include resident fish distribution in the regional database. The cooperating projects plan to begin delivering distribution update information beginning in the first quarter of FY-03.

  6. Florida products pipeline set to double capacity

    SciTech Connect (OSTI)

    True, W.R.

    1995-11-13

    Directional drilling has begun this fall for a $68.5 million, approximately 110,000 b/d expansion of Central Florida Pipeline Co.`s refined products line from Tampa to Orlando. The drilling started in August and is scheduled to conclude this month, crossing under seven water bodies in Hillsborough, Polk, and Osceola counties. The current 6 and 10-in. system provides more than 90% of the petroleum products used in Central Florida, according to Central Florida Pipeline. Its additional capacity will meet the growing region`s demand for gasoline, diesel, and jet fuel. The new pipeline, along with the existing 10-in. system, will increase total annual capacity from 30 million bbl (82,192 b/d) to approximately 70 million bbl (191,781 b/d). The older 6-in. line will be shutdown when the new line is operating fully. The steps of pipeline installation are described.

  7. Microsoft Word - EOC Activation - Pipeline Overpressurization...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center (EOC) has been activated as a precautionary measure after an over-pressurized pipeline vented about 100 gallons of liquid natural gas approximately two miles from the WIPP...

  8. Pump packages for Colombian crude oil pipeline

    SciTech Connect (OSTI)

    1994-05-01

    The Caterpillar Large Engine Center recently packaged ten engine-driven centrifugal pump packages for British Petroleum Exploration`s crude oil pipeline in South America. The ten sets, which use Ingersoll-Dresser centrifugal pumps, are designed to increase significantly the output of BP`s Central LLanos pipeline located in a remote region near Bogota, Colombia. BP anticipates that the addition of the new pump packages will increase daily volume from the current 100000 barrels to approximately 210000 barrels when the upgrade of the pipeline is completed in September. The ten sets are installed at three separate pumping stations. The stations are designed to operate continuously while unmanned, with only periodic maintenance required. The pump packages are powered by Caterpillar 3612 engines rated 3040 kW at 1000 r/min. The 12-cylinder engines are turbocharged and charge-air cooled and use the pipeline oil as both fuel and a cooling medium for the fuel injectors.

  9. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    were necessary as a result of a bearing issue on the compressor station's solar turbine unit, estimating that the unit will be back in service by mid-March. Northwest...

  10. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    In order to avoid an OFO, Northwest will use its limited storage flexibility at Jackson Prairie and Clay Basin to offset possible OFOs at the Kemmerer station by withdrawing...

  11. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    contributed to climbing prices in most regional markets. Prices at Northwest-South of Green River rebounded 1.71 from a 2-day low to average 5.12 per MMBtu on Thursday, May...

  12. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    regional price averaged 2.72 per MMBtu, with a minimum of 0.66 (Northwest South of Green River) and a maximum of 5.32 (Stanfield). In all, five trading locations recorded...

  13. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    between 24 and 52 cents in all locations but one. The one exception, Northwest-South of Green River, saw prices drop 2.30 per MMBtu on the week. Maintenance in the region has...

  14. Method and apparatus for constructing buried pipeline systems

    SciTech Connect (OSTI)

    Heuer, C.E.; Hsu, H.; Jahns, H.O.

    1982-11-09

    A method and apparatus for mitigating or eliminating the frost heave of refrigerated pipelines buried in frost-susceptible soil are provided. A blanket of heat absorbent material is placed over the pipeline on the surface of the soil to increase the flow of heat into the region surrounding the pipeline. This technique may be used in combination with other frost heave mitigation techniques, such as insulating the pipeline and supporting the pipeline with a heave resistant bedding material.

  15. Seadrift/UCAR pipelines achieve ISO registration

    SciTech Connect (OSTI)

    Arrieta, J.R.; Byrom, J.A.; Gasko, H.M. )

    1992-10-01

    Proper meter station design using gas orifice meters must include consideration of a number of factors to obtain the best accuracy available. This paper reports that Union Carbide's Seadrift/UCAR Pipelines has become the world's first cross-country pipelines to comply with the International Standards Organization's quality criteria for transportation and distribution of ethylene. Carbide's organization in North America and Europe, with 22 of the corporation's businesses having the internationally accepted quality system accredited by a third-party registrar.

  16. Machinist Pipeline/Apprentice Program Program Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Machinist Pipeline/Apprentice Program Program Description The Machinist Pipeline Program was created by the Prototype Fabrication Division to fill a critical need for skilled journeyworker machinists. It is based on a program developed by the National Institute for Metalworking Skills (NIMS) in conjunction with metalworking trade associations to develop and maintain a globally competitive U.S. workforce. The goal is to develop and implement apprenticeship programs that are aligned with

  17. Are shorted pipeline casings a problem

    SciTech Connect (OSTI)

    Gibson, W.F. )

    1994-11-01

    The pipeline industry has many road and railroad crossings with casings which have been in service for more than 50 years without exhibiting any major problems, regardless of whether the casing is shorted to or isolated from the carrier pipe. The use of smart pigging and continual visual inspection when retrieving a cased pipeline segment have shown that whether shorted or isolated, casings have no significant bearing on the presence or absence of corrosion on the carrier pipe.

  18. Pacific Northwest National Laboratory- Reservoir Stimulation Optimization

    Broader source: Energy.gov [DOE]

    2015 marked a string of significant recognitions and accomplishments for Dr. Carlos Fernandez and his team from Pacific Northwest National Laboratory (PNNL) for their GTO-funded research in...

  19. World pipeline work set for rapid growth

    SciTech Connect (OSTI)

    Not Available

    1992-08-01

    This paper reports on international pipeline construction which has entered a fast-growth period, accelerated by the new political and economic realities around the world and increasing demand for natural gas, crude oil and refined petroleum products. Many projects are under way or in planning for completion in the mid- to late 1990s in Europe, South America, Asia and the Middle East. Pipeline And Gas Journal's projection calls for construction or other work on 30,700 miles of new natural gas, crude oil and refined products pipelines in the 1992-93 period outside Canada and the U.S. These projects will cost an estimated $30 billion-plus. Natural gas pipelines will comprise most of the mileage, accounting for almost 23,000 miles at an estimated cost of $26.3 billion. Products pipelines, planned or under construction, will add another 5,800 miles at a cost of $2.8 billion. Crude oil pipelines, at a minimum, will total 1,900 new miles at a cost of slightly under $1 billion.

  20. Bayou pipeline crossing requires helical pilings

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    This paper discusses a routine inspection by Transcontinental Gas Pipe Line Corp. which revealed the approximately 100 ft of its 30-in gas pipeline in St. Landry Parish, La., had become suspended. The situation occurred in the West Atchafalaya Floodway after periods of heavy rain produced strong currents that scoured the soil from around and below the pipeline. To protect the pipeline from possible damage from overstressing, Transco awarded a lump-sum contract to Energy Structures Inc., Houston, to design and install pipeline supports. The pipeline supports engineered by ESI used helical-screw pilings instead of conventional driven pilings. The helical piles were manufactured by A.B. Chance Co., Centralia, Mo. Typically, helical pilings consist of steel pipe ranging from 3.5- to 8-in. diameter pipe with one or more helixes welded onto the pipe. Selection of the proper piling cross-section was based on design loads and soil conditions at the project locations. length was determined by the amount of pipeline suspension and on-site soil conditions.

  1. Independent Oversight Inspection, Pacific Northwest National Laboratory- December 2003

    Broader source: Energy.gov [DOE]

    Inspection of Environment, Safety, and Health Management at the Pacific Northwest National Laboratory

  2. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updates and Status Current Status: Up Open Issues List of known problems, submitted bug reports and issues we are actively working on Read More » Timeline and Updates A list of major system changes and updates Read More » Email Announcements Archive An archive of email announcements sent to NERSC users regarding Edison Read More » Last edited: 2016-04-29 11:34:32

  3. WIPP Nitrate Updates 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 WIPP Nitrate Salt Bearing Waste Container Isolation Plan Implementation Update, December 30, 2014 Waste Isolation Pilot Plant EPA I.D. Number: NM4890139088-TSDF WIPP Nitrate Salt Bearing Waste Container Isolation Plan Implementation Update, December 23, 2014 Waste Isolation Pilot Plant EPA I.D. Number: NM4890139088-TSDF WIPP Nitrate Salt Bearing Waste Container Isolation Plan Implementation Update, December 18, 2014 Waste Isolation Pilot Plant EPA I.D. Number: NM4890139088-TSDF WIPP Nitrate

  4. WIPP Nitrate Updates 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 WIPP Nitrate Salt Bearing Waste Container Isolation Plan Implementation Update, July 23, 2015 Waste Isolation Pilot Plant EPA I.D. Number: NM4890139088-TSDF WIPP Nitrate Salt Bearing Waste Container Isolation Plan Implementation Update, July 16, 2015 Waste Isolation Pilot Plant EPA I.D. Number: NM4890139088-TSDF WIPP Nitrate Salt Bearing Waste Container Isolation Plan Implementation Update, July 9, 2015 Waste Isolation Pilot Plant EPA I.D. Number: NM4890139088-TSDF WIPP Nitrate Salt Bearing

  5. Overview of interstate hydrogen pipeline systems.

    SciTech Connect (OSTI)

    Gillette, J .L.; Kolpa, R. L

    2008-02-01

    The use of hydrogen in the energy sector of the United States is projected to increase significantly in the future. Current uses are predominantly in the petroleum refining sector, with hydrogen also being used in the manufacture of chemicals and other specialized products. Growth in hydrogen consumption is likely to appear in the refining sector, where greater quantities of hydrogen will be required as the quality of the raw crude decreases, and in the mining and processing of tar sands and other energy resources that are not currently used at a significant level. Furthermore, the use of hydrogen as a transportation fuel has been proposed both by automobile manufacturers and the federal government. Assuming that the use of hydrogen will significantly increase in the future, there would be a corresponding need to transport this material. A variety of production technologies are available for making hydrogen, and there are equally varied raw materials. Potential raw materials include natural gas, coal, nuclear fuel, and renewables such as solar, wind, or wave energy. As these raw materials are not uniformly distributed throughout the United States, it would be necessary to transport either the raw materials or the hydrogen long distances to the appropriate markets. While hydrogen may be transported in a number of possible forms, pipelines currently appear to be the most economical means of moving it in large quantities over great distances. One means of controlling hydrogen pipeline costs is to use common rights-of-way (ROWs) whenever feasible. For that reason, information on hydrogen pipelines is the focus of this document. Many of the features of hydrogen pipelines are similar to those of natural gas pipelines. Furthermore, as hydrogen pipeline networks expand, many of the same construction and operating features of natural gas networks would be replicated. As a result, the description of hydrogen pipelines will be very similar to that of natural gas pipelines. The following discussion will focus on the similarities and differences between the two pipeline networks. Hydrogen production is currently concentrated in refining centers along the Gulf Coast and in the Farm Belt. These locations have ready access to natural gas, which is used in the steam methane reduction process to make bulk hydrogen in this country. Production centers could possibly change to lie along coastlines, rivers, lakes, or rail lines, should nuclear power or coal become a significant energy source for hydrogen production processes. Should electrolysis become a dominant process for hydrogen production, water availability would be an additional factor in the location of production facilities. Once produced, hydrogen must be transported to markets. A key obstacle to making hydrogen fuel widely available is the scale of expansion needed to serve additional markets. Developing a hydrogen transmission and distribution infrastructure would be one of the challenges to be faced if the United States is to move toward a hydrogen economy. Initial uses of hydrogen are likely to involve a variety of transmission and distribution methods. Smaller users would probably use truck transport, with the hydrogen being in either the liquid or gaseous form. Larger users, however, would likely consider using pipelines. This option would require specially constructed pipelines and the associated infrastructure. Pipeline transmission of hydrogen dates back to late 1930s. These pipelines have generally operated at less than 1,000 pounds per square inch (psi), with a good safety record. Estimates of the existing hydrogen transmission system in the United States range from about 450 to 800 miles. Estimates for Europe range from about 700 to 1,100 miles (Mohipour et al. 2004; Amos 1998). These seemingly large ranges result from using differing criteria in determining pipeline distances. For example, some analysts consider only pipelines above a certain diameter as transmission lines. Others count only those pipelines that transport hydrogen from a producer to a customer (e.g., those pipelines designed for in-plant transport of hydrogen for use as feedstock or fuel are not counted). Operational status and hydrogen purity levels are also factors in defining these ranges. Hydrogen pipelines in the United States are predominantly along the Gulf Coast and connect major hydrogen producers with well-established, long-term customers. These hydrogen transmission systems pall by comparison with the 180,000-mile natural gas transmission pipeline. Since 1939, Germany has had a 130-mile pipeline carrying 20,000 lb/hour of hydrogen in a 10-inch pipe at 290 psi gauge (psig). The longest hydrogen pipeline in Europe is owned by Air Liquide and extends 250 miles from Northern France to Belgium. In theory, a blend of up to 20% hydrogen in natural gas can be transported without modifying natural gas pipelines (Oney et al. 1994).

  6. The 14th Pipeline and Gas Journal 500 report. [Statistical dimensions of leading US pipeline companies

    SciTech Connect (OSTI)

    Congram, G.E.

    1994-09-01

    This article presents compiled data on oil and gas pipeline systems in the US and includes specific information on mileage, volume of transported fluids, and cost information. It lists the rankings based on miles of pipeline, units of gas sold, number of customers, units of petroleum sold, and utility by production sales. Information is also presented in alphabetical format.

  7. Update on Revenue Strategies

    Broader source: Energy.gov [DOE]

    Better Buildings Residential Network Program Sustainability Peer Exchange Call Series: Update on Revenue Strategies, call slides and discussion summary, December 11, 2014.

  8. Electricity Monthly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Update November 28, 2012 Map of Electric System Selected for Daily Peak Demand was replaced with the correct map showing Selected Wholesale Electricity and Natural Gas Locations....

  9. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Methodology and Documentation General The Electricity Monthly Update is prepared by the Electric Power Operations Team, Office of Electricity, Renewables and Uranium Statistics,...

  10. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    , 2009 Next Release: July 9, 2009 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, July 2, 2009) Since...

  11. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    6, 2008 Next Release: November 14, 2008 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the week ending Wednesday, November 5) Since...

  12. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    0, 2009 Next Release: August 6, 2009 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, July 29, 2009) Since...

  13. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    7, 2008 Next Release: July 24, 2008 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview The report week ended July 16 registered significant...

  14. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    Release: Thursday, January 7, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, December 16, 2009)...

  15. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    P.M. Next Release: November 5, 2009 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, October 28, 2009)...

  16. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    Release: Thursday, March 4, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, February 24, 2010)...

  17. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    Release: Thursday, April 28, 2011 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, April 20, 2011) Natural...

  18. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    Release: Thursday, January 6, 2011 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, December 15, 2010)...

  19. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Release: Thursday, August 26, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, August 18, 2010) Natural...

  20. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    , 2009 Next Release: April 9, 2009 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, April 1, 2009) Despite a...

  1. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    2009 Next Release: February 19, 2009 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, February 11, 2009)...

  2. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Release: Thursday, November 4, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, October 27, 2010) As the...

  3. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2008 Next Release: November 6, 2008 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the week ending Wednesday, October 29) Natural gas...

  4. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2008 Next Release: November 20, 2008 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (Wednesday, November 5, to Thursday, November 13)...

  5. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Release: Thursday, October 28, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, October 20, 2010)...

  6. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    Wednesday, November 10, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, November 3, 2010) Price...

  7. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Release: Thursday, August 19, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, August 11, 2010) Summer...

  8. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2008 Next Release: October 23, 2008 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For week ending Wednesday, October 15) Since Wednesday,...

  9. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Release: Thursday, February 3, 2011 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, January 26, 2011)...

  10. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    9, 2008 Next Release: June 26, 2008 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview Since Wednesday, June 11, natural gas spot prices...

  11. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Release: Thursday, December 16, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, December 8, 2010) In...

  12. Electricity Monthly Update

    Gasoline and Diesel Fuel Update (EIA)

    Electricity Monthly Update With Data for February 2016 | Release Date: April ... to the gains of other renewable energy sources (such as solar and wind), these recent NPD ...

  13. NNMCAB Member Update

    Broader source: Energy.gov [DOE]

    At the September 24, 2014 Board meeting Patti Jones LANL, Provided the Members with a Status Update to the TA-21 Demolition and Storm Water Season Rain Events.

  14. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    See all Electricity Reports Electricity Monthly Update With Data for November 2014 | Release Date: Jan. 26, 2015 | Next Release Date: Feb. 24, 2015 Previous Issues Issue:...

  15. NIF Status Update - 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    status NIF Status Update - 2014 May - Highlights of May Experiments on NIF Gigabar Equation-of-State Experiments Production of Beryllium Capsules for NIF Begins First Weekly...

  16. Electricity Monthly Update

    Gasoline and Diesel Fuel Update (EIA)

    Contact Information and Staff The Electricity Monthly Update is prepared by the Electric Power Operations Team, Office of Electricity, Renewables and Uranium Statistics, U.S. ...

  17. Electricity Monthly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Electricity Monthly Update Explained Highlights The Highlights page features in the center ... presents statistics on end-use: retail ratesprices and consumption of electricity. ...

  18. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    data to EIA. The number of companies reporting increased by 3 from 2008, to include Alon USA, Chalmette Refining LLC, and Western Refining, Inc. Natural Gas Transportation Update...

  19. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    2008 Next Release: December 11, 2008 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the week ending Wednesday, December 3, 2008) Since...

  20. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    9, 2009 Next Release: March 26, 2009 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, March 18, 2009) Warmer...

  1. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    P.M. Next Release: October 29, 2009 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, October 21, 2009) Since...

  2. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    2008 Next Release: October 2, 2008 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (Wednesday, September 17, to Wednesday, September 24)...

  3. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Release: Thursday, January 20, 2011 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, January 12, 2011)...

  4. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    5, 2009 Next Release: July 2, 2009 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, June 24, 2009) Natural gas...

  5. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Next Release: Thursday, May 19, 2011 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, May 11, 2011) Natural...

  6. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    Thursday, September 16, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, September 8, 2010) Price...

  7. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Thursday, September 23, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, September 15, 2010)...

  8. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Next Release: Thursday, May 12, 2011 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, May 4, 2011) Wholesale...

  9. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Release: Thursday, April 15, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, April 7, 2010) Since...

  10. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Release: Thursday, February 25, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, February 17, 2010)...

  11. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Release: Thursday, March 18, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, March 10, 2010) Since...

  12. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    Release: Thursday, March 24, 2011 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, March 16, 2011) With...

  13. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    15, 2009 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, January 7, 2009) Since Wednesday, December...

  14. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 12, 2008 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview Spot gas at most market locations (outside the Rocky Mountain Region) traded...

  15. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electricity Monthly Update Explained Highlights The Highlights page features in the center a short article about a major event or an informative topic. The left column contains...

  16. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    March 12, 2009 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, March 4, 2009) A late winter cold spell in...

  17. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact Information and Staff The Electricity Monthly Update is prepared by the Electric Power Operations Team, Office of Electricity, Renewables and Uranium Statistics, U.S....

  18. Directives Quarterly Updates

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    Listings of new Justification Memoranda and new or revised Directives that have been posted to the DOE Directives, Delegations, and Requirements Portal. Updated quarterly.

  19. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, 2009 Next Release: August 13, 2009 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, August 5, 2009) Natural...

  20. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    P.M. Next Release: Thursday, July 1, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, June 23, 2010)...

  1. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Next Release: Thursday, September 9, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, September 1,...

  2. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    , 2008 Next Release: July 10, 2008 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview Since Wednesday, June 25, natural gas spot prices...

  3. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    P.M. Next Release: Thursday, January 14, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, January 6,...

  4. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Next Release: Thursday, November 19, 2009 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, November 11,...

  5. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    P.M. Next Release: Thursday, June 17, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, June 9, 2010)...

  6. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    P.M. Next Release: Thursday, August 12, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, August 4, 2010)...

  7. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Next Release: Thursday, September 2, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, August 25,...

  8. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    P.M. Next Release: Thursday, August 5, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, July 28, 2010)...

  9. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    P.M. Next Release: Thursday, May 13, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, May 5, 2010)...

  10. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, 2009 Next Release: April 16, 2009 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, April 8, 2009) Since...

  11. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    15, 2009 Next Release: January 23, 2009 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, January 14, 2009) In...

  12. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    16, 2009 Next Release: April 23, 2009 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, April 15, 2009) Since...

  13. INNOVATIVE ELECTROMAGNETIC SENSORS FOR PIPELINE CRAWLERS

    SciTech Connect (OSTI)

    J. Bruce Nestleroth

    2004-11-05

    Internal inspection of pipelines is an important tool for ensuring safe and reliable delivery of fossil energy products. Current inspection systems that are propelled through the pipeline by the product flow cannot be used to inspect all pipelines because of the various physical barriers they encounter. Recent development efforts include a new generation of powered inspection platforms that crawl slowly inside a pipeline and are able to maneuver past the physical barriers that can limit inspection. At Battelle, innovative electromagnetic sensors are being designed and tested for these new pipeline crawlers. The various sensor types can be used to assess a wide range of pipeline anomalies including corrosion, mechanical damage, and cracks. The Applied Energy Systems Group at Battelle is concluding the first year of work on a projected three-year development effort. In this first year, two innovative electromagnetic inspection technologies were designed and tested. Both were based on moving high-strength permanent magnets to generate inspection energy. One system involved translating permanent magnets towards the pipe. A pulse of electric current would be induced in the pipe to oppose the magnetization according to Lenz's Law. The decay of this pulse would indicate the presence of defects in the pipe wall. This inspection method is similar to pulsed eddy current inspection methods, with the fundamental difference being the manner in which the current is generated. Details of this development effort were reported in the first semiannual report on this project. This second semiannual report focuses on the development of a second inspection methodology, based on rotating permanent magnets. During this period, a rotating permanent magnet exciter was designed and built. The exciter unit produces strong eddy currents in the pipe wall. The tests have shown that at distances of a pipe diameter or more, the currents flow circumferentially, and that these circumferential currents are deflected by pipeline defects such as corrosion and axially aligned cracks. Simple sensors are used to detect the change in current densities in the pipe wall.

  14. DOE and Northwest Partners Host Three-Day Market Introduction Workshop in Portland

    Broader source: Energy.gov [DOE]

    More than 270 attendees gathered in Portland, OR to participate in the "Voices for SSL Efficiency" Solid-State Lighting Workshop on July 9-11, 2008. The workshop, hosted by DOE, Bonneville Power Administration, Energy Trust of Oregon, Northwest Energy Efficiency Alliance, and Puget Sound Energy, was the third DOE meeting to explore how Federal, State, and private-sector organizations can work together to guide market introduction of high-performance SSL products. The workshop brought together a diverse gathering of participants – energy efficiency organizations, utilities, government, and industry – to share insights, ideas, and updates on the rapidly evolving SSL market.

  15. Sandy Updates | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Press Release Search link to facebook link to twitter Email Signup Sign up for updates Go Search form Search Press Release You are here Home Sandy Updates Sandy Updates No...

  16. Subsea pipeline isolation systems: Reliability and costs

    SciTech Connect (OSTI)

    Masheder, R.R.

    1996-08-01

    Since the Piper Alpha disaster, more than 80 subsea isolation systems (SSIS) have been installed in subsea gas and oil pipelines in the U.K. continental shelf at an estimated cost in the region of {Brit_pounds}500 million. The reliability and costs of these installations have now been assessed between Dec. 1992 and Oct. 1993. This assessment was based upon comprehensive reliability and cost databases which were established so that the studies could be based upon factual information in order to obtain a current status as required by the sponsoring group. The study consultants report findings have now been consolidated into a report by the UKOOA Pipeline Valve Work Group. Probabilities of failure for different types of valves and systems have been assessed and expenditures broken down and compared. The results of the studies and the conclusions drawn by UKOOA Pipeline Valve Group and the HSE Offshore Safety Division are presented in this paper.

  17. Caspian pipeline combine awards construction contract

    SciTech Connect (OSTI)

    Not Available

    1992-11-02

    This paper reports that the Caspian Pipeline Consortium (CPC) has let contract to Overseas Bechtel Inc. for a 500 mile crude oil export pipeline in Russia. Bechtel will provide engineering, procurement, financing, and construction services and serve as project manager for the 42 inc. line that will extend west from Grozny, near the Caspian Sea, to Novorossiisk, on the Black Sea. Estimated cost is more than $850 million. At Grozny, the new line will tie into 800 miles of existing pipeline that runs along the north shore of the Caspian Sea from supergiant Tengiz field in Kazakhstan. Together, the two segments will form a 1,300 mile system capable of shipping crude oil from the Tengiz region and from Baku, Azerbaijan, to a new terminal and port facilities at Novorossiisk for shipment to world markets, ultimately reaching open oceans via the Mediterranean Sea.

  18. 1996 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1996-12-01

    The Pacific Northwest Loads and Resources Study (White Book) is published annually by BPA and establishes the planning basis for supplying electricity to customers. It serves a dual purpose. First, the White Book presents projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. Second, the White Book serves as a benchmark for annual BPA determinations made pursuant to the 1981 regional power sales contracts. Specifically, BPA uses the information in the White Book for determining the notice required when customers request to increase or decrease the amount of power purchased from BPA. Aside from these purposes, the White Book is used for input to BPA`s resource planning process. The White Book compiles information obtained from several formalized resource planning reports and data submittals, including those from the Northwest Power Planning Council (Council) and the Pacific Northwest Utilities Conference Committee (PNUCC). 11 figs., 12 tabs.

  19. Sasabe, AZ Natural Gas Pipeline Exports to Mexico (Million Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Sasabe, AZ Natural Gas Pipeline Exports to Mexico (Million Cubic Feet) Sasabe, AZ Natural Gas Pipeline Exports to Mexico (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug ...

  20. U.S. Natural Gas Imports by Pipeline from Mexico

    U.S. Energy Information Administration (EIA) Indexed Site

    Pipeline Volumes 83 83 72 64 59 70 1973-2016 Pipeline Prices 1.65 1.55 1.08 1.22 1.50 1.22 1993

  1. Evaluation of Natural Gas Pipeline Materials for Hydrogen Science...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Evaluation of Natural Gas Pipeline Materials for Hydrogen Science Presentation by 04-Adams to DOE Hydrogen Pipeline R&D Project Review Meeting held January 5-6, 2005 at Oak Ridge ...

  2. Blending Hydrogen into Natural Gas Pipeline Networks: A Review...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Blending Hydrogen into Natural Gas Pipeline Networks: A Review of Key Issues Blending Hydrogen into Natural Gas Pipeline Networks: A Review of Key Issues The United States has 11 ...

  3. Marine pipeline dynamic response to waves from directional wave spectra

    SciTech Connect (OSTI)

    Lambrakos, K.F.

    1982-07-01

    A methodology has been developed to calculate the dynamic probabilistic movement and resulting stresses for marine pipelines subjected to storm waves. A directional wave spectrum is used with a Fourier series expansion to simulate short-crested waves and calculate their loads on the pipeline. The pipeline displacements resulting from these loads are solutions to the time-dependent beam-column equation which also includes the soil resistance as external loading. The statistics of the displacements for individual waves are combined with the wave statistics for a given period of time, e.g. pipeline lifetime, to generate probabilistic estimates for net pipeline movement. On the basis of displacements for specified probability levels the pipeline configuration is obtained from which pipeline stresses can be estimated using structural considerations, e.g. pipeline stiffness, end restraints, etc.

  4. U.S. pipelines continue gains into 1996

    SciTech Connect (OSTI)

    True, W.R.

    1996-11-25

    US interstate natural gas, crude oil, and petroleum product pipelines turned in health performances for 1995, continuing impressive efficiency improvements that were evident in 1994. Revenues and incomes earned from operations along with volumes moved are among data annually submitted to FERC and tracked by Oil and Gas Journal year to year in this exclusive report. This year`s report expands coverage of plans for new construction and completed-cost figures by including Canadian activity for the same 12-month period: July 1, 1995, to June 30, 1996. The paper includes data on the following: pipeline revenues, incomes--1995; North American pipeline costs, estimated; US pipeline costs, estimated vs. actual; North American compressor-construction costs; US compressor costs, estimated vs. actual; Canadian pipeline construction costs, actual; US interstate mileage; investment in liquids pipelines; 10 years of land construction costs; to 10 interstate liquids lines; top 10 interstate gas lines; liquids pipeline companies; and gas pipeline companies.

  5. Weather, construction inflation could squeeze North American pipelines

    SciTech Connect (OSTI)

    True, W.R.

    1998-08-31

    Major North American interstate and interprovincial pipeline companies appear headed for a squeeze near-term: 1997 earnings from operations were down for the second straight year even as the companies expected new construction to begin this year or later to cost more. The effects of warmer-than-normal weather during 1997 in North America made a showing in annual reports filed by US regulated interstate oil and gas pipeline companies with the US Federal Energy Regulatory Commission (FERC). This paper contains data on the following: pipeline revenues, incomes--1997; North American pipeline costs; North American pipeline costs (estimated vs. actual); North American compressor construction costs; US compressor costs (estimated vs. actual); US interstate mileage; investment in liquids pipelines; 10 years of land construction costs; top 10 interstate liquids lines; top 10 interstate gas lines; liquids pipeline companies; and gas pipeline companies.

  6. ,"U.S. Natural Gas Pipeline Imports From Canada (MMcf)"

    U.S. Energy Information Administration (EIA) Indexed Site

    1: U.S. Natural Gas Pipeline Imports From Canada (MMcf)" "Sourcekey","N9102CN2" "Date","U.S. Natural Gas Pipeline Imports From Canada (MMcf)" 26845,1027883 27210,959063 ...

  7. Proceedings of the 2005 Hydrogen Pipeline Working Group Workshop

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Hydrogen Pipeline Working Group Workshop included more than 45 researchers and industry experts. The workshop provided an overview of hydrogen pipeline projects.

  8. Webinar January 12: Assessing Steel Pipeline and Weld Susceptibility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen pipelines in the United States are built in compliance with the ASME B31.12 Code for Hydrogen Piping and Pipelines. The Code is based on decades of research and in-field ...

  9. Hydrogen Permeability and Integrity of Hydrogen Delivery Pipelines

    Broader source: Energy.gov [DOE]

    Project Objectives: To gain basic understanding of hydrogen permeation behavior and its impact on hydrogen embrittlement of pipeline steels under high gaseous pressures relevant to hydrogen gas transmission pipeline

  10. Detroit, MI Natural Gas Pipeline Imports From Canada (Million...

    U.S. Energy Information Administration (EIA) Indexed Site

    data. Release Date: 09302015 Next Release Date: 10302015 Referring Pages: U.S. Natural Gas Pipeline Imports by Point of Entry Detroit, MI Natural Gas Imports by Pipeline from...

  11. Detroit, MI Natural Gas Pipeline Imports From Canada (Dollars...

    U.S. Energy Information Administration (EIA) Indexed Site

    Date: 09302015 Next Release Date: 10302015 Referring Pages: U.S. Price of Natural Gas Pipeline Imports by Point of Entry Detroit, MI Natural Gas Imports by Pipeline from...

  12. Update: Solar Powered Classroom | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Update: Solar Powered Classroom Update: Solar Powered Classroom Addthis Speakers Aaron Sebens Duration 1:00

  13. Evaluation of Natural Gas Pipeline Materials for Hydrogen Science |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Natural Gas Pipeline Materials for Hydrogen Science Evaluation of Natural Gas Pipeline Materials for Hydrogen Science Presentation by 04-Adams to DOE Hydrogen Pipeline R&D Project Review Meeting held January 5-6, 2005 at Oak Ridge National Laboratory in Oak Ridge, Tennessee. PDF icon 04_adams_nat_gas.pdf More Documents & Publications Evalutation of Natural Gas Pipeline Materials and Infrastructure for Hydrogen/Mixed Gas Service Hydrogen Compatibility of Materials

  14. 2005 Hydrogen Pipeline Working Group Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Hydrogen Pipeline Working Group Workshop 2005 Hydrogen Pipeline Working Group Workshop DOE held a Hydrogen Pipeline Working Group Workshop August 30-31, 2005 in Augusta, Ga. The workshop provided the opportunity for researchers to hear from industry experts about their field experiences with current in-service hydrogen pipelines (both new construction and converted). The group also explored research or other activities needed to improve costs and operability. Issues addressed by industry

  15. Deliverability on the Interstate Natural Gas Pipeline System

    Reports and Publications (EIA)

    1998-01-01

    Examines the capability of the national pipeline grid to transport natural gas to various U.S. markets.

  16. Innovative Electromagnetic Sensors for Pipeline Crawlers

    SciTech Connect (OSTI)

    J. Bruce Nestleroth

    2006-05-04

    Internal inspection of pipelines is an important tool for ensuring safe and reliable delivery of fossil energy products. Current inspection systems that are propelled through the pipeline by the product flow cannot be used to inspect all pipelines because of the various physical barriers they encounter. Recent development efforts include a new generation of powered inspection platforms that crawl slowly inside a pipeline and are able to maneuver past the physical barriers that can limit inspection. At Battelle, innovative electromagnetic sensors are being designed and tested for these new pipeline crawlers. The various sensor types can be used to assess a wide range of pipeline anomalies including corrosion, mechanical damage, and cracks. Battelle is in the final year on a projected three-year development effort. In the first year, two innovative electromagnetic inspection technologies were designed and tested. Both were based on moving high-strength permanent magnets to generate inspection energy. One system involved translating permanent magnets towards the pipe. A pulse of electric current would be induced in the pipe to oppose the magnetization according to Lenz's Law. The decay of this pulse would indicate the presence of defects in the pipe wall. This inspection method is similar to pulsed eddy current inspection methods, with the fundamental difference being the manner in which the current is generated. Details of this development effort were reported in the first semiannual report on this project. The second inspection methodology is based on rotating permanent magnets. The rotating exciter unit produces strong eddy currents in the pipe wall. At distances of a pipe diameter or more from the rotating exciter, the currents flow circumferentially. These circumferential currents are deflected by pipeline defects such as corrosion and axially aligned cracks. Simple sensors are used to detect the change in current densities in the pipe wall. The second semiannual report on this project reported on experimental and modeling results. The results showed that the rotating system was more adaptable to pipeline inspection and therefore only this system will be carried into the second year of the sensor development. In the third reporting period, the rotating system inspection was further developed. Since this is a new inspection modality without published fundamentals to build upon, basic analytical and experimental investigations were performed. A closed form equation for designing rotating exciters and positioning sensors was derived from fundamental principles. Also signal processing methods were investigated for detection and assessment of pipeline anomalies. A lock in amplifier approach was chosen as the method for detecting the signals. Finally, mechanical implementations for passing tight restrictions such as plug valves were investigated. This inspection concept is new and unique; a United States patent application has been submitted. In this reporting period, a general design of the rotating permanent magnet inspection system is presented. The rotating permanent magnet inspection system is feasible for pipes ranging in diameter from 8 to 18 inches using a two pole configuration. Experimental results and theoretical calculations provide the basis for selection of the critical design parameters. The parameters include a significant magnet to pipe separation that will facilitate the passage of pipeline features. With the basic values of critical components established, the next step is a detailed mechanical design of a pipeline ready inspection system.

  17. Sensor and transmitter system for communication in pipelines

    DOE Patents [OSTI]

    Cooper, John F.; Burnham, Alan K.

    2013-01-29

    A system for sensing and communicating in a pipeline that contains a fluid. An acoustic signal containing information about a property of the fluid is produced in the pipeline. The signal is transmitted through the pipeline. The signal is received with the information and used by a control.

  18. Expansion of the U.S. Natural Gas Pipeline Network

    Reports and Publications (EIA)

    2009-01-01

    Additions in 2008 and Projects through 2011. This report examines new natural gas pipeline capacity added to the U.S. natural gas pipeline system during 2008. In addition, it discusses and analyzes proposed natural gas pipeline projects that may be developed between 2009 and 2011, and the market factors supporting these initiatives.

  19. Energy 101: Wind Turbines - 2014 Update | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Wind Turbines - 2014 Update Energy 101: Wind Turbines - 2014 Update

  20. North West Shelf pipeline. Part 2 (conclusion). Laying Australia's North West Shelf pipeline

    SciTech Connect (OSTI)

    Seymour, E.V.; Craze, D.J.; Ruinen, W.

    1984-05-14

    Details of the construction of Australia's North West Shelf gas pipeline cover the pipelaying operation, trunkline-to-riser tie-in, posttrenching, backfilling, slugcatcher construction, connection with the shore terminal, and hydrostatic testing.

  1. Cathodic protection of pipelines in discontinuous permafrost

    SciTech Connect (OSTI)

    Mitchell, C.J.; Wright, M.D.; Waslen, D.W.

    1997-10-01

    There are many unknowns and challenges in providing cathodic protection (CP) for a pipeline located in discontinuous permafrost areas. Preliminary pipe-to-soil data indicates that CP coverage was achieved in these regions without needing local anodes. Work is required to verify whether this conclusion can be extended over the course of an annual freeze-thaw cycle.

  2. New system pinpoints leaks in ethylene pipeline

    SciTech Connect (OSTI)

    Hamande, A.; Condacse, V.; Modisette, J.

    1995-04-01

    A model-based leak detection, PLDS, developed by Modisette Associates, Inc., Houston has been operating on the Solvay et Cie ethylene pipeline since 1989. The 6-in. pipeline extends from Antwerp to Jemeppe sur Sambre, a distance of 73.5 miles and is buried at a depth of 3 ft. with no insulation. Except for outlets to flares, located every 6 miles for test purposes, there are no injections or deliveries along the pipeline. Also, there are block valves, which are normally open, at each flare location. This paper reviews the design and testing procedures used to determine the system performance. These tests showed that the leak system was fully operational and no false alarms were caused by abrupt changes in inlet/outlet flows of the pipeline. It was confirmed that leaks larger than 2 tonnes/hr. (40 bbl/hr) are quickly detected and accurately located. Also, maximum leak detection sensitivity is 1 tonne/hr. (20 bbl/hr) with a detection time of one hour. Significant operational, configuration, and programming issues also were found during the testing program. Data showed that temperature simulations needed re-examining for improvement since accurate temperature measurements are important. This is especially true for ethylene since its density depends largely on temperature. Another finding showed the averaging period of 4 hrs. was too long and a 1 to 2 hr. interval was better.

  3. Computer Science and Information Technology Student Pipeline

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science and Information Technology Student Pipeline Program Description Los Alamos National Laboratory's High Performance Computing and Information Technology Divisions recruit and hire promising undergraduate and graduate students in the areas of Computer Science, Information Technology, Management Information Systems, Computer Security, Software Engineering, Computer Engineering, and Electrical Engineering. Students are provided a mentor and challenging projects to demonstrate their

  4. Northwest Distributed/Community Wind Workgroup Meeting- Seattle

    Broader source: Energy.gov [DOE]

    As part of the DOE's Northwest Wind Resource and Action Center, Northwest SEED will facilitate a workgroup meeting for stakeholders involved in the distributed and community wind sector in the...

  5. o CNMS Status Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Town Hall User Meeting (see attached slides) * Agenda: o Intro of UEC o CNMS Status Update o UEC activities o Nominations for open seat on the UEC * Activities o Monthly Telecon o...

  6. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    7, 2010 at 2:00 P.M. Next Release: Thursday, October 14, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday,...

  7. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    4, 2010 at 2:00 P.M. Next Release: Thursday, October 21, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday,...

  8. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    2, 2010 at 2:00 P.M. Next Release: Thursday, April 29, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday,...

  9. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    9, 2010 at 2:00 P.M. Next Release: Thursday, May 6, 2010 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday,...

  10. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    3, 2011 at 2:00 P.M. Next Release: Thursday, February 10, 2011 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending...

  11. Sunrayce 97 Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Update For more information contact: Gerald M. Wilson Sunrayce 97 Press Center (810) 665-0092 Indianapolis, Ind., June 17, 1997-- Qualifying for Sunrayce 97 concluded today with 36 ...

  12. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Transportation Update: Pacific Gas and Electric Company (PG&E) extended a Stage 2 high-inventory operational flow order (OFO) from Friday, June 8, through Wednesday, June 13,...

  13. NIF Status Update - 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    news NIF Status Update - 2014 May Gigabar Equation-of-State Experiment Reaches Record Pressures On May 29, the NIF Team fired two gigabar (Gbar)-class equation-of-state experiments...

  14. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Holiday Notice: Due to the federal holiday in observance of Martin Luther King Day on Monday, January 21, 2002, the next issue of the Natural Gas Weekly Update will be published on...

  15. Natural Gas Weekly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Update until January 2, 2002. Overview: Monday, December 17, 2001 The spot price at the Henry Hub finished the trading week on December 14 at 2.41 per MMBtu, roughly 30 cents or...

  16. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    at 2:00 P.M. Next Release: October 8, 2009 Overview Prices Storage Other Market Trends Natural Gas Transportation Update Overview (For the Week Ending Wednesday, September 30,...

  17. Natural Gas Weekly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    on Thursday, May 9, 2002. A sample of EIA's report can be seen at: Weekly Gas Storage Test Page. The Natural Gas Weekly Market Update report will convert to the new data series...

  18. Sandy Updates | Department of Energy

    Energy Savers [EERE]

    Press Release Search link to facebook link to twitter Email Signup Sign up for updates Go Search form Search Press Release You are here Home » Sandy Updates Sandy Updates No articles link to facebook link to twitter Email Signup Sign up for updates Go Energy.gov

  19. Section 1251 Report Update

    National Nuclear Security Administration (NNSA)

    November 2010 Update to the National Defense Authorization Act of FY2010 Section 1251 Report New START Treaty Framework and Nuclear Force Structure Plans 1. Introduction This paper updates elements of the report that was submitted to Congress on May 13, 2010, pursuant to section 1251 of the National Defense Authorization Act for Fiscal Year 2010 (Public Law 111-84) ("1251 Report"). 2. National Nuclear Security Administration and modernization of the complex - an overview From FY 2005

  20. UPDATED: April 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    UPDATE: Tropical Storm Isaac UPDATE: Tropical Storm Isaac August 27, 2012 - 6:30pm Addthis Satellite image of Tropical Storm Isaac. | Courtesy of NOAA. Satellite image of Tropical Storm Isaac. | Courtesy of NOAA. April Saylor April Saylor Former Digital Outreach Strategist, Office of Public Affairs Tropical Storm Isaac has impacted Florida and is expected to make landfall along the Gulf Coast by early morning on August 29. As thousands of Gulf Coast residents are without power, the Energy

  1. 2013 Annual Planning Summary for the Pacific Northwest Site Office |

    Energy Savers [EERE]

    Department of Energy Pacific Northwest Site Office 2013 Annual Planning Summary for the Pacific Northwest Site Office The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Pacific Northwest Site Office. The Pacific Northwest Site Office's APS was consolidated within the Office of Science's APS available here. More Documents & Publications 2013 Annual Planning Summary for the Thomas Jefferson Site Office 2013 Annual Planning

  2. PIA - NGP Fellow Application System PIA, Pacific Northwest National

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory | Department of Energy NGP Fellow Application System PIA, Pacific Northwest National Laboratory PIA - NGP Fellow Application System PIA, Pacific Northwest National Laboratory PIA NGP Fellow Application System PIA, Pacific Northwest National Laboratory PDF icon PIA - NGP Fellow Application System PIA, Pacific Northwest National Laboratory More Documents & Publications PIA - WEB iPASS System DOE PIA Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory

  3. State and Local Code Implementation: Northwest Region - 2014 BTO Peer

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review | Department of Energy Northwest Region - 2014 BTO Peer Review State and Local Code Implementation: Northwest Region - 2014 BTO Peer Review Presenter: Ken Baker, Northwest Energy Efficiency Alliance View the Presentation PDF icon State and Local Code Implementation: Northwest Region - 2014 BTO Peer Review More Documents & Publications CX-100507 Categorical Exclusion Determination Hit the Road: Applying Lessons from National Campaigns to a Local Context (201) CX-007529: Categorical

  4. 2012 Annual Planning Summary for Pacific Northwest Site Office

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Pacific Northwest Site Office.

  5. Program Updates | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Updates Program Updates April 13, 2016 Program Update: 1st Quarter 2016 Inside this Update: Deputy Under Secretary Klaus Visits the Fernald Preserve in Ohio; Preservationists Tour Historic Log Cabin at the Grand Junction, Colorado, Office; Applied Studies and Technology: Training Course in Groundwater Geochemistry and Reaction Modeling; Watershed Protection at the Fernald Preserve in Ohio; African Americans and the Manhattan Project; LM Updates Stakeholders on the Recent Closure of

  6. Analysis of gas chilling alternatives for Arctic pipelines

    SciTech Connect (OSTI)

    Dvoiris, A.; McMillan, D.K.; Taksa, B.

    1994-12-31

    The operation of buried natural gas pipelines in Arctic regions requires installation of gas chilling facilities at compressor stations. These facilities are required in order to cool compressed pipeline gases to temperatures below that of permanently frozen surrounding soil. If these pipeline gas temperatures are too high, the frozen ground around the pipelines will eventually thaw. This is undesirable for many reasons amongst which are ground settlement and possible catastrophic failure of the pipeline. This paper presents the results of a study which compared several alternative methods of gas chilling for possible application at one of the compressor stations on the proposed new Yamal-Center gas pipeline system in the Russian Arctic. This technical and economic study was performed by Gulf Interstate Engineering (GIE) for GAZPROM, the gas company in Russia that will own and operate this new pipeline system. Geotechnical, climatical and other information provided by GAZPROM, coupled with information developed by GIE, formed the basis for this study.

  7. Assessment of Geothermal Resources for Electric Generation in the Pacific Northwest, Draft Issue Paper for the Northwest Power Planning Council

    SciTech Connect (OSTI)

    Geyer, John D.; Kellerman, L.M.; Bloomquist, R.G.

    1989-09-26

    This document reviews the geothermal history, technology, costs, and Pacific Northwest potentials. The report discusses geothermal generation, geothermal resources in the Pacific Northwest, cost and operating characteristics of geothermal power plants, environmental effects of geothermal generation, and prospects for development in the Pacific Northwest. This report was prepared expressly for use by the Northwest Power Planning Council. The report contains numerous references at the end of the document. [DJE-2005

  8. W-band ARM Cloud Radar (WACR) Update and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    W-band ARM Cloud Radar (WACR) Update and Status PopStefanija, Ivan ProSensing, Inc. Mead, James ProSensing Inc. Widener, Kevin Pacific Northwest National Laboratory Category: Instruments Two W-band ARM Cloud Radars (WACR) have been developed for the SGP and the ARM Mobile Facility (AMF) by ProSensing. The SGP WACR was successfully deployed in the same shelter as the MMCR in 2005. It is currently collecting co-polarization and cross-polarization spectral moments (reflectivity, Doppler velocity,

  9. Pacific Northwest Storms Situation Report # 1

    SciTech Connect (OSTI)

    2006-12-15

    Severe wind and snow storms hit the Pacific Northwest region on December 14 – 15, 2006, following severe flooding during the past few days. The severe weather resulted in major power outages through the region. At peak there were 1.8 million customers without power which included BC Hydro in Canada. Currently, there are over 1.5 million outages in the region as a result of the Pacific Northwest Storms. This represents about 42 percent of customers in affected utility service areas in Oregon and Washington. See table below. Because the current wind and snow storms are coming on the heels of extensive flooding in the region, electric utilities are experiencing damage. Wind gusts reached close to 100 mph in some areas of the region. The storm is expected to bring its strong winds and heavy snow into Idaho, Montana and Wyoming Friday and into the weekend. There are currently no reported major impacts to the petroleum and natural gas infrastructure.

  10. Coal slurry pipelines: Blach Mesa and future projects

    SciTech Connect (OSTI)

    Brolick, H.J.

    1998-12-31

    Most people in the mining industry have some familiarity with pipelining of minerals in slurry form, however, many may not realize the extent that mineral slurry pipeline transport is used throughout the world. The author is referring to the shipment of the minerals in the raw or concentrate form, not tailings pipelines which are also commonplace in the minerals industry. There are over forty mineral pipelines around the world. The list covers a wide range of minerals, including copper ore concentrate, iron ore concentrate, limestone, phosphate concentrate, kaolin, Gilsonite and gold ore, with only eleven of the mineral pipelines located in the USA. It should be noted that one of the earliest slurry pipelines was a 108 mile coal slurry pipeline in Ohio, which started up in 1957. The pipeline only operated until 1963 when a railroad company literally bought out the transportation contract. This really was the beginning of the unit train concept. Each mineral has specific physical and chemical characteristics to be considered when evaluating transport by pipeline. The processing required at the pipeline origin, as well as at the pipeline termination, are also important factors in determining slurry pipeline feasibility. Transport distance, annual volume, and continuity of shipments are other important factors. One of the most difficult minerals to transport as a slurry is coal because the specific gravity is closer to water than most other minerals. Thus, the fine balance of creating enough fine particles to serve as a carrier for the coarser material, while at the same time having a material that can be economically dewatered is very sensitive and technical designs will vary with types of coal. Additionally, since coal is purchased for its thermal value, excess surface moisture can lower the value of the coal to the customer. One of the most successful slurry pipeline operations, and the only current operating long-distance coal slurry pipeline is the Black Mesa Pipeline System. The Black Mesa Pipeline is a 273 mile (439 km) long, 18-inch (457 mm) coal/water slurry pipeline, originating on the Black Mesa in the Northeastern part of Arizona, USA. The system delivers coal from the Peabody Coal Company`s Black Mesa open pit mine to the Mohave Generating Station which is a 1580 MW steam powered electric generating plant located in Laughlin, Nevada. Black Mesa Pipeline began commercial operation in November, 1970 and has transported in excess of 110,000,000 tons (99,800,000 metric tons) of coal with an availability factor of 99%.

  11. Sustaining the Northwest Way of Life.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration. Customer Services.

    1991-08-01

    These Discussion Papers are from a number of organizations with a high stake in the future performance of the Bonneville Power Administration. Bonneville solicited papers from other organizations to assure a broaded-based discussion of the topics for the 1991 Programs in Perspective. PIP meetings will be held throughout the Northwest in September. PIP runs on a two-year cycle. The first year is aimed at discussion of broad, strategic issues. The second year evaluates specific program levels for all Bonneville programs and test them for affordability against financial constraints. This year's PIP focuses on strategic-issues discussion. It specifically asks for regional discussion to help put some flesh on the skeleton of Bonneville's own vision for its future: Best for the Northwest Through Teamwork B... P... A... The Most Competitive and Socially Responsible Power System in the Nation'' Specific topics are (1) achieving social responsibility and (2) conserving Northwest competitiveness. Bonneville executives chose this vision as a means of directing the organization into and beyond the 1990s. It guides the 3000 plus employees of the agency in their day-to-day operations. By asking for discussion of the terms Most Competitive'' and Socially Responsible'' in the 1991 PIP, Bonneville intends to better understand the diverse needs of its customers and constituents, and to become of even greater service to the Northwest. The papers are designed to help stimulate thought about the dimensions of the future direction of BPA. Bonneville intends that the real substance of PIP will occur in the meetings themselves. We hope that these papers will provoke new thinking, and that the interchange of views in the meetings will produce new approaches to the issues.

  12. Pacific Northwest Storms Situation Report # 5

    SciTech Connect (OSTI)

    none,

    2006-12-19

    Significant progress has been made in restoring power to customers in the Pacific Northwest region. Currently, 186,627 customers remain without power. The majority of customers without power are served by Puget Sound Energy. This is down from 1.8 million customers who lost power following severe wind and snow storms on December 14-15, 2006. The customers without power represent about 6 percent of customers in the affected utility service areas of Oregon and Washington. See table below.

  13. Pacific Northwest Storms Situation Report # 4

    SciTech Connect (OSTI)

    none,

    2006-12-18

    Significant progress has been made in restoring power to customers in the Pacific Northwest region. Currently, 237,030 customers remain without power. This is down from 1.8 million customers who lost power following severe wind and snow storms on December 14-15, 2006. The customers without power represent about 8 percent of customers in the affected utility service areas of Oregon and Washington.

  14. Natural Gas Pipeline Network: Changing and Growing

    Reports and Publications (EIA)

    1996-01-01

    This chapter focuses upon the capabilities of the national natural gas pipeline network, examining how it has expanded during this decade and how it may expand further over the coming years. It also looks at some of the costs of this expansion, including the environmental costs which may be extensive. Changes in the network as a result of recent regional market shifts are also discussed.

  15. Crossing Active Faults on the Sakhalin II Onshore Pipeline Route: Pipeline Design and Risk Analysis

    SciTech Connect (OSTI)

    Mattiozzi, Pierpaolo; Strom, Alexander

    2008-07-08

    Twin oil (20 and 24 inch) and gas (20 and 48 inch) pipeline systems stretching 800 km are being constructed to connect offshore hydrocarbon deposits from the Sakhalin II concession in the North to an LNG plant and oil export terminal in the South of Sakhalin island. The onshore pipeline route follows a regional fault zone and crosses individual active faults at 19 locations. Sakhalin Energy, Design and Construction companies took significant care to ensure the integrity of the pipelines, should large seismic induced ground movements occur during the Operational life of the facilities. Complex investigations including the identification of the active faults, their precise location, their particular displacement values and assessment of the fault kinematics were carried out to provide input data for unique design solutions. Lateral and reverse offset displacements of 5.5 and 4.5 m respectively were determined as the single-event values for the design level earthquake (DLE) - the 1000-year return period event. Within the constraints of a pipeline route largely fixed, the underground pipeline fault crossing design was developed to define the optimum routing which would minimize stresses and strain using linepipe materials which had been ordered prior to the completion of detailed design, and to specify requirements for pipe trenching shape, materials, drainage system, etc. Detailed Design was performed with due regard to actual topography and to avoid the possibility of the trenches freezing in winter, the implementation of specific drainage solutions and thermal protection measures.

  16. Structural monitoring helps assess deformations in Arctic pipelines

    SciTech Connect (OSTI)

    Nyman, K.J.; Lara, P.F.

    1986-11-10

    Advanced structural monitoring systems can play an important role in the evaluation of arctic pipeline distortions along the alignment. These systems can influence pipeline design requirements, reduce capital costs, and improve operating reliability. Differential soil movements resulting from terrain instabilities are the main features which threaten a pipeline's structural integrity and affect the design of buried pipeline systems in the Arctic. Economic, aesthetic, and safety concerns make conventional buried construction an optimum design choice for an arctic crude-oil or gas-pipeline transportation system. However, variable frozen and thawed soil conditions underlying the pipeline along a discontinuous permafrost corridor pose a challenge to the design and operation of such systems. Crude-oil pipelines which must operate at elevated temperatures can be installed in unfrozen soils or in permafrost soils where initially frozen segments will exhibit limited settlement under the thawed conditions imposed by pipeline construction and operation. Ice-rich portions of the frozen alignment may have an unacceptable settlement potential for a warm buried pipeline. In contrast, natural-gas pipelines can be operated cold to increase throughput capability and to prevent the problems associated with thawing permafrost.

  17. Serving the People of the Northwest

    SciTech Connect (OSTI)

    None, None

    2009-05-01

    IF YOU LIVE IN THE PACIFIC NORTHWEST, CHANCES ARE YOU USE ELECTRICITY THAT’S MARKETED BY THE BONNEVILLE POWER ADMINISTRATION OR IS TRANSMITTED OVER BPA POWER LINES. Headquartered in Portland, Ore., BPA is a federal agency that markets wholesale electricity and transmission to the region’s utilities as well as to some large industries. BPA provides about one-third of the electricity used in the Northwest and operates over three-fourths of the region’s high-voltage transmission. BPA does not rely on annual appropriations from Congress for its financing. Instead, the agency recovers all of its costs through sales of electricity and transmission services and repays the U.S. Treasury in full with interest for any money it borrows. BPA sells wholesale power at cost rather than charging market prices. The bulk of the power BPA sells is generated at federal hydroelectric dams on the Columbia River, thus providing some of the lowest-cost electricity in the nation. This low-cost, clean power has been a cornerstone of the Northwest economy for decades, stimulating growth and new jobs. As concerns about global climate change are placing a new premium on clean energy, the federal hydro system has become an increasingly valuable resource. In addition to being low cost, electricity produced by the federal hydro system has no greenhouse gas emissions. And this power source is renewable — replenished each year by the region’s rainfall and snowmelt.

  18. CFPL installs products pipeline with directional drilling

    SciTech Connect (OSTI)

    1996-01-01

    Central Florida Pipeline Company (CFPL), a subsidiary of GATX Terminals Corp., Tampa, FL, has used directional drilling under seven water bodies in Hillsborough, Polk and Osceola Counties in constructing its new pipeline from Tampa to Orlando. Primary reason for using directional drilling is to protect the environment by minimizing water turbidity while the 16-inch diameter, 109-mile refined petroleum products pipeline is being installed. Total cost of the project is pegged at $68.5 million. Directional drilling enabled the pipe to be placed about 20 feet below the bottom of: The Alafia River in Riverview with 999 feet drilled; Port Sutton Channel near the Port of Tampa with 2,756 feet drilled; Reedy Creek Swamp at the intersection of Interstate 4 and Highway 192 which had 1,111 feet drilled; Wetland {number_sign}70 southwest of Lake Wales with 1,575 feet drilled; Peace River south of Bartow had 2,470 feet drilled; Bonnet Creek west of Kissimmee had 693 feet drilled. Shingle Creek near the borders of Osceola and Orange Counties with 1,700 feet drilled. This paper reviews the design plans for construction and the emergency response plans should a rupture occur in the line.

  19. Drag reduction in coal log pipelines

    SciTech Connect (OSTI)

    Marrero, T.R.; Liu, H.

    1996-12-31

    It is well-known that solutions of dissolved long-chain macromolecules produce lower friction or drag losses than with the solvent alone. In coal log pipeline (CLP), water is the conveying medium. Synthetic polymers such as poly(ethylene oxide) have been dissolved in water and tested for their extent of drag reduction as a function of concentration and other variables. Lab-scale experimental results for CLP indicate substantial drag reduction at low concentration levels of polymer. But, the macromolecules exhibit degradation under mechanical shear stresses. The large molecules break into smaller units. This degradation effect causes a loss of drag reduction. However, high levels of drag reduction can be maintained as follows: (1) by injecting polymer into the CLP at several locations along the pipeline, (2) by injecting polymer of different particle sizes, (3) by using more robust types of polymers, or (4) by using polymer-fiber mixtures. This report presents the value of drag-reducing agents in terms of pumping power net cost savings. In addition, this report outlines the environmental impact of drag reduction polymers, and end-of-pipeline water treatment processes. For an operating CLP, hundreds of miles in length, the use of poly(ethylene oxide) as a drag reducing agent provides significant pumping power cost savings at a minimal materials cost.

  20. Timeline and Updates

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Timeline and Updates Timeline and Updates CDT 16.01 was set to default on Edison on 2/3/2016 February 3, 2016 by Zhengji Zhao The Cray Developer Toolkit (CDT) 16.01 was set to default on 2/3/2016. The following software versions are new default on Edison: Read the full post Edison is back to production in the new facility building January 4, 2016 Edison is back online after about 5 weeks of downtime to move to a new facility building, Wang Hall, at the main Berkeley campus. The following are the

  1. Hydrogen pipeline compressors annual progress report.

    SciTech Connect (OSTI)

    Fenske, G. R.; Erck, R. A.

    2011-07-15

    The objectives are: (1) develop advanced materials and coatings for hydrogen pipeline compressors; (2) achieve greater reliability, greater efficiency, and lower capital in vestment and maintenance costs in hydrogen pipeline compressors; and (3) research existing and novel hydrogen compression technologies that can improve reliability, eliminate contamination, and reduce cost. Compressors are critical components used in the production and delivery of hydrogen. Current reciprocating compressors used for pipeline delivery of hydrogen are costly, are subject to excessive wear, have poor reliability, and often require the use of lubricants that can contaminate the hydrogen (used in fuel cells). Duplicate compressors may be required to assure availability. The primary objective of this project is to identify, and develop as required, advanced materials and coatings that can achieve the friction, wear, and reliability requirements for dynamically loaded components (seal and bearings) in high-temperature, high-pressure hydrogen environments prototypical of pipeline and forecourt compressor systems. The DOE Strategic Directions for Hydrogen Delivery Workshop identified critical needs in the development of advanced hydrogen compressors - notably, the need to minimize moving parts and to address wear through new designs (centrifugal, linear, guided rotor, and electrochemical) and improved compressor materials. The DOE is supporting several compressor design studies on hydrogen pipeline compression specifically addressing oil-free designs that demonstrate compression in the 0-500 psig to 800-1200 psig range with significant improvements in efficiency, contamination, and reliability/durability. One of the designs by Mohawk Innovative Technologies Inc. (MiTi{reg_sign}) involves using oil-free foil bearings and seals in a centrifual compressor, and MiTi{reg_sign} identified the development of bearings, seals, and oil-free tribological coatings as crucial to the successful development of an advanced compressor. MiTi{reg_sign} and ANL have developed potential coatings for these rigorous applications; however, the performance of these coatings (as well as the nickel-alloy substrates) in high-temperature, high-speed hydrogen environments is unknown at this point.

  2. U.S., Canada pipeline work shows gain in 1994

    SciTech Connect (OSTI)

    Watts, J.

    1994-01-01

    Pipeline construction activity in the US and Canada is expected to be down slightly during 1994 from 1993 mileage, even though natural gas pipeline work remains steady on both sides of the border. Pipeline and Gas Journal and Pipeline and Utilities Construction estimate that a total of 3.638 miles of new gas, crude oil and refined products pipeline will be installed during 1994 in the US, down from a total of 4.278 miles built in 1993. Canadian 1994 work remains essentially unchanged in 1994, with 1,094 new miles compared to 1,091 miles in 1993. This paper reviews the proposed construction by region and company. It includes information on mileage, type pipeline, and estimated completion date.

  3. Program Review Updates and Briefings

    Broader source: Energy.gov [DOE]

    You can learn more about the U.S. Department of Energy (DOE) Geothermal Technologies Program by reading its program review updates and program briefings. These updates and briefings feature...

  4. Update on Franklin retirement plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Update on Franklin retirement plans Update on Franklin retirement plans February 21, 2012 by Helen He NERSC is making progress on plans to acquire our next major system. Franklin's...

  5. Virtual Pipeline System Testbed to Optimize the U.S. Natural Gas Transmission Pipeline System

    SciTech Connect (OSTI)

    Kirby S. Chapman; Prakash Krishniswami; Virg Wallentine; Mohammed Abbaspour; Revathi Ranganathan; Ravi Addanki; Jeet Sengupta; Liubo Chen

    2005-06-01

    The goal of this project is to develop a Virtual Pipeline System Testbed (VPST) for natural gas transmission. This study uses a fully implicit finite difference method to analyze transient, nonisothermal compressible gas flow through a gas pipeline system. The inertia term of the momentum equation is included in the analysis. The testbed simulate compressor stations, the pipe that connects these compressor stations, the supply sources, and the end-user demand markets. The compressor station is described by identifying the make, model, and number of engines, gas turbines, and compressors. System operators and engineers can analyze the impact of system changes on the dynamic deliverability of gas and on the environment.

  6. World`s developing regions provide spark for pipeline construction

    SciTech Connect (OSTI)

    Koen, A.D.; True, W.R.

    1996-02-05

    This paper reviews the proposed construction of oil and gas pipelines which are underway or proposed to be started in 1996. It breaks down the projects by region of the world, type of product to be carried, and diameter of pipeline. It also provides mileage for each category of pipeline. Major projects in each region are more thoroughly discussed giving details on construction expenditures, construction problems, and political issues.

  7. DOE - Office of Legacy Management -- Los Alamos Underground Med Pipelines -

    Office of Legacy Management (LM)

    NM 02 Los Alamos Underground Med Pipelines - NM 02 FUSRAP Considered Sites Site: Los Alamos Underground Med Pipelines ( NM.02 ) Eliminated - Remedial action being performed by the Los Alamos Area Office of the DOE Albuquerque Operations Office Designated Name: Not Designated Alternate Name: Los Alamos County Industrial Waste Lines NM.02-1 Location: Los Alamos , New Mexico NM.02-1 Evaluation Year: 1986 NM.02-1 Site Operations: From 1952 to 1965, underground pipelines or industrial waste lines

  8. EIS-0410: Keystone Oil Pipeline Project | Department of Energy

    Energy Savers [EERE]

    0: Keystone Oil Pipeline Project EIS-0410: Keystone Oil Pipeline Project SUMMARY This environmental impact statement (EIS) analyzes the environmental impacts of the TransCanada Keystone Oil Pipeline Project. The U.S. Department of State (DOS) was the lead agency. The U.S. Department of Energy's (DOE's) Western Power Administration (Western) participated as a cooperating agency in the preparation of this EIS in order to address Western's proposed response to interconnection requests from Minnkota

  9. New construction era reflected in East Texas LPG pipeline

    SciTech Connect (OSTI)

    Mittler, T.J. )

    1990-04-02

    Installation of 240 miles of 6, 10, and 12-in. LPG pipelines from Mont Belvieu to Tyler, Tex., has provided greater feedstock-supply flexibility to a petrochemical plant in Longview, Tex. The project, which took place over 18 months, included tie-ins with metering at four Mont Belvieu suppliers. The new 10 and 12-in. pipelines now transport propane while the new and existing parts of a 6-in. pipeline transport propylene.

  10. Energy Department Moves Forward on Alaska Natural Gas Pipeline Loan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guarantee Program | Department of Energy Moves Forward on Alaska Natural Gas Pipeline Loan Guarantee Program Energy Department Moves Forward on Alaska Natural Gas Pipeline Loan Guarantee Program May 26, 2005 - 1:03pm Addthis WASHINGTON, DC - The Department of Energy tomorrow, Friday, May 27, will publish a Notice of Inquiry in the Federal Register seeking public comment on an $18 billion loan guarantee program to encourage the construction of a pipeline that will bring Alaskan natural gas to

  11. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Updates and Status Current Status: Up Carver Email Announcements Archive An archive of email announcements sent to NERSC users regarding Carver. Read More » Timeline Timeline of significant Carver events. Read More » Last edited: 2016-04-29 11:34:35

  12. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Updates and Status Current Status: Up Announcements All recent NERSC announcements affecting Euclid. Read More » Email Announcements Archive An archive of email announcements sent to NERSC users regarding Euclid. Read More » Known Problems All known current problems with Euclid. Read More » Timeline Timeline of significant Euclid events. Read More » Last edited: 2016-04-29 11:34:40

  13. Updated opal opacities

    SciTech Connect (OSTI)

    Iglesias, C.A.; Rogers, F.J.

    1996-06-01

    The reexamination of astrophysical opacities has eliminated gross discrepancies between a variety of observations and theoretical calculations; thus allowing for more detailed tests of stellar models. A number of such studies indicate that model results are sensitive to modest changes in the opacity. Consequently, it is desirable to update available opacity databases with recent improvements in physics, refinements of element abundance, and other such factors affecting the results. Updated OPAL Rosseland mean opacities are presented. The new results have incorporated improvements in the physics and numerical procedures as well as corrections. The main opacity changes are increases of as much as 20{percent} for Population I stars due to the explicit inclusion of 19 metals (compared to 12 metals in the earlier calculations) with the other modifications introducing opacity changes smaller than 10{percent}. In addition, the temperature and density range covered by the updated opacity tables has been extended. As before, the tables allow accurate interpolation in density and temperature as well as hydrogen, helium, carbon, oxygen, and metal mass fractions. Although a specific metal composition is emphasized, opacity tables for different metal distributions can be made readily available. The updated opacities are compared to other work. {copyright} {ital 1996 The American Astronomical Society.}

  14. WIPP UPDATE: June 4, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4, 2014 WIPP updates to be published twice a week WIPP recovery efforts are maintaining a steady pace; however, long-term activities are underway that are not as conducive to daily updates. The Department remains committed to transparency, and it is making this change to ensure updates remain meaningful and informative for stakeholders. Updates will now be provided every Tuesday and Friday, or more often if timely news arises. Community meetings scheduled June 5 - The City of Carlsbad and DOE

  15. Advanced Manufacturing pipeline brings NSC and Minority Serving...

    National Nuclear Security Administration (NNSA)

    aligns with the broad interests of DOE sites and emphasizes the entire career pipeline. ... Kansas to collaborate on NNSA technology projects Amarillo Students Win Regional National ...

  16. EIA - Natural Gas Pipeline Network - Depleted Reservoir Storage...

    U.S. Energy Information Administration (EIA) Indexed Site

    Depleted Reservoir Storage Configuration About U.S. Natural Gas Pipelines - Transporting ... Depleted Production Reservoir Underground Natural Gas Storage Well Configuration Depleted ...

  17. EIA - Natural Gas Pipeline Network - Aquifer Storage Reservoir...

    U.S. Energy Information Administration (EIA) Indexed Site

    Aquifer Storage Reservoir Configuration About U.S. Natural Gas Pipelines - Transporting ... Aquifer Underground Natural Gas Storage Reservoir Configuration Aquifer Underground ...

  18. ,"Rhode Island Natural Gas Pipeline and Distribution Use Price...

    U.S. Energy Information Administration (EIA) Indexed Site

    ies","Frequency","Latest Data for" ,"Data 1","Rhode Island Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic Feet)",1,"Annual",2005 ,"Release Date:","9...

  19. ,"New Jersey Natural Gas Pipeline and Distribution Use Price...

    U.S. Energy Information Administration (EIA) Indexed Site

    eries","Frequency","Latest Data for" ,"Data 1","New Jersey Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic Feet)",1,"Annual",2005 ,"Release Date:","9...

  20. ,"North Carolina Natural Gas Pipeline and Distribution Use Price...

    U.S. Energy Information Administration (EIA) Indexed Site

    s","Frequency","Latest Data for" ,"Data 1","North Carolina Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic Feet)",1,"Annual",2005 ,"Release Date:","9...

  1. ,"North Dakota Natural Gas Pipeline and Distribution Use Price...

    U.S. Energy Information Administration (EIA) Indexed Site

    ies","Frequency","Latest Data for" ,"Data 1","North Dakota Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic Feet)",1,"Annual",2005 ,"Release Date:","9...

  2. ,"New Hampshire Natural Gas Pipeline and Distribution Use Price...

    U.S. Energy Information Administration (EIA) Indexed Site

    es","Frequency","Latest Data for" ,"Data 1","New Hampshire Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic Feet)",1,"Annual",2005 ,"Release Date:","9...

  3. ,"New Mexico Natural Gas Pipeline and Distribution Use Price...

    U.S. Energy Information Administration (EIA) Indexed Site

    eries","Frequency","Latest Data for" ,"Data 1","New Mexico Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic Feet)",1,"Annual",2005 ,"Release Date:","9...

  4. ,"New York Natural Gas Pipeline and Distribution Use Price (Dollars...

    U.S. Energy Information Administration (EIA) Indexed Site

    Series","Frequency","Latest Data for" ,"Data 1","New York Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic Feet)",1,"Annual",2005 ,"Release Date:","9...

  5. Energy Department Moves Forward on Alaska Natural Gas Pipeline...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Moves Forward on Alaska Natural Gas Pipeline Loan Guarantee Program Energy Department Moves Forward on ... It would also fulfill the Bush Administration's policy to bring ...

  6. EIS-0517: Port Arthur Liquefaction Project and Port Arthur Pipeline...

    Energy Savers [EERE]

    Counties, Texas, and Cameron Parish, Louisiana EIS-0517: Port Arthur Liquefaction Project and Port Arthur Pipeline Project; Jefferson and Orange Counties, Texas, and Cameron ...

  7. ,"Total Crude Oil and Petroleum Products Net Receipts by Pipeline...

    U.S. Energy Information Administration (EIA) Indexed Site

    Net Receipts by Pipeline, Tanker, Barge and Rail between PAD Districts" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of...

  8. Enter the Post-Doc: The Untapped Sourcing Pipeline

    SciTech Connect (OSTI)

    Boscow, Ryan B.

    2011-07-30

    This article addresses the potential formulation and utilization of an industry-based Post-Doc program in order to create workforce candidate pipelines with targeted universities.

  9. Report to Congress: Dedicated Ethanol Pipeline Feasability Study...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independence and Security Act of 2007 (EISA). Section 243 directs DOE to study the feasibility of constructing and using pipelines dedicated to the transportation of ethanol. ...

  10. Refiners react to changes in the pipeline infrastructure

    SciTech Connect (OSTI)

    Giles, K.A.

    1997-06-01

    Petroleum pipelines have long been a critical component in the distribution of crude and refined products in the U.S. Pipelines are typically the most cost efficient mode of transportation for reasonably consistent flow rates. For obvious reasons, inland refineries and consumers are much more dependent on petroleum pipelines to provide supplies of crude and refined products than refineries and consumers located on the coasts. Significant changes in U.S. distribution patterns for crude and refined products are reshaping the pipeline infrastructure and presenting challenges and opportunities for domestic refiners. These changes are discussed.

  11. EIA - Analysis of Natural Gas Imports/Exports & Pipelines

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    trends, offshore production shut-ins caused by infrastructure problems and hurricanes, imports and exports of pipeline and liquefied natural gas, and the above-average...

  12. EIS-0517: Port Arthur Liquefaction Project and Port Arthur Pipeline...

    Broader source: Energy.gov (indexed) [DOE]

    natural gas marine terminal along the Sabine-Neches ship channel (Jefferson County, Texas), about 35 miles of new pipeline, and associated facilities. DOE, Office of Fossil...

  13. EnSys Energy Report on Keystone XL Pipeline

    Broader source: Energy.gov [DOE]

    As part of ongoing analysis, the Department of Energy's Office of Policy and International Affairs commissioned a report on the proposed Keystone XL pipeline project.

  14. ,"Alamo, TX Natural Gas Pipeline Imports From Mexico (MMcf)"

    U.S. Energy Information Administration (EIA) Indexed Site

    Alamo, TX Natural Gas Pipeline Imports From Mexico (MMcf)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of Series","Frequency","Latest Data...

  15. Renewable Energy Pipeline Development Terms of Reference | Open...

    Open Energy Info (EERE)

    Development Terms of Reference Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Renewable Energy Pipeline Development Terms of Reference AgencyCompany Organization:...

  16. ,"Detroit, MI Natural Gas Pipeline Imports From Canada (MMcf...

    U.S. Energy Information Administration (EIA) Indexed Site

    ,"Worksheet Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","Detroit, MI Natural Gas Pipeline Imports From Canada (MMcf)",1,"Annual",2014 ,"Release...

  17. Evaluation of Trenchless Technologies for Installation of Pipelines...

    Office of Scientific and Technical Information (OSTI)

    Title: Evaluation of Trenchless Technologies for Installation of Pipelines in Radioactive Environments - 10249 No abstract prepared. Authors: Jubin, Robert Thomas 1 ; Patton, ...

  18. Comparing Existing Pipeline Networks with the Potential Scale of Future U.S. CO2 Pipeline Networks

    SciTech Connect (OSTI)

    Dooley, James J.; Dahowski, Robert T.; Davidson, Casie L.

    2008-02-29

    There is growing interest regarding the potential size of a future U.S. dedicated CO2 pipeline infrastructure if carbon dioxide capture and storage (CCS) technologies are commercially deployed on a large scale. In trying to understand the potential scale of a future national CO2 pipeline network, comparisons are often made to the existing pipeline networks used to deliver natural gas and liquid hydrocarbons to markets within the U.S. This paper assesses the potential scale of the CO2 pipeline system needed under two hypothetical climate policies and compares this to the extant U.S. pipeline infrastructures used to deliver CO2 for enhanced oil recovery (EOR), and to move natural gas and liquid hydrocarbons from areas of production and importation to markets. The data presented here suggest that the need to increase the size of the existing dedicated CO2 pipeline system should not be seen as a significant obstacle for the commercial deployment of CCS technologies.

  19. Updates - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updates by Diane Johnson Email Alerts Subscribe to automatic e-mail notification about updates to the portal. Email Alerts

  20. Pacific Northwest Storms Situation Report # 6

    SciTech Connect (OSTI)

    none,

    2006-12-20

    Significant progress has been made in restoring power to customers in the Pacific Northwest region. Currently, 134,868 customers remain without power. The number of outages is down from 1.8 million customers who lost power following severe wind and snow storms on December 14-15, 2006. The customers without power represent less than 5 percent of customers in the affected utility service areas of Oregon and Washington. The majority of customers without power are served by Puget Sound Energy and Seattle City Light.

  1. Materials Solutions for Hydrogen Delivery in Pipelines

    SciTech Connect (OSTI)

    Ningileri, Shridas T.; Boggess, Todd A; Stalheim, Douglas

    2013-01-02

    The main objective of the study is as follows: Identify steel compositions/microstructures suitable for construction of new pipeline infrastructure and evaluate the potential use of the existing steel pipeline infrastructure in high pressure gaseous hydrogen applications. The microstructures of four pipeline steels were characterized and tensile testing was conducted in gaseous hydrogen and helium at pressures of 5.5 MPa (800 psi), 11 MPa (1600 psi) and 20.7 MPa (3000 psi). Based on reduction of area, two of the four steels that performed the best across the pressure range were selected for evaluation of fracture and fatigue performance in gaseous hydrogen at 5.5 MPa (800 psi) and 20.7 MPa (3000 psi). The basic format for this phase of the study is as follows: Microstructural characterization of volume fraction of phases in each alloy; Tensile testing of all four alloys in He and H{sub 2} at 5.5 MPa (800 psi), 11 MPa (1600 psi), and 20.7 MPa (3000 psi). RA performance was used to choose the two best performers for further mechanical property evaluation; Fracture testing (ASTM E1820) of two best tensile test performers in H{sub 2} at 5.5 MPa (800 psi) and 20.7 MPa (3000 psi); Fatigue testing (ASTM E647) of two best tensile test performers in H2 at 5.5 MPa (800 psi) and 20.7 MPa (3000 psi) with frequency =1.0 Hz and R-ratio=0.5 and 0.1.

  2. Pipeline bottoming cycle study. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-06-01

    The technical and economic feasibility of applying bottoming cycles to the prime movers that drive the compressors of natural gas pipelines was studied. These bottoming cycles convert some of the waste heat from the exhaust gas of the prime movers into shaft power and conserve gas. Three typical compressor station sites were selected, each on a different pipeline. Although the prime movers were different, they were similar enough in exhaust gas flow rate and temperature that a single bottoming cycle system could be designed, with some modifications, for all three sites. Preliminary design included selection of the bottoming cycle working fluid, optimization of the cycle, and design of the components, such as turbine, vapor generator and condensers. Installation drawings were made and hardware and installation costs were estimated. The results of the economic assessment of retrofitting bottoming cycle systems on the three selected sites indicated that profitability was strongly dependent upon the site-specific installation costs, how the energy was used and the yearly utilization of the apparatus. The study indicated that the bottoming cycles are a competitive investment alternative for certain applications for the pipeline industry. Bottoming cycles are technically feasible. It was concluded that proper design and operating practices would reduce the environmental and safety hazards to acceptable levels. The amount of gas that could be saved through the year 2000 by the adoption of bottoming cycles for two different supply projections was estimated as from 0.296 trillion ft/sup 3/ for a low supply projection to 0.734 trillion ft/sup 3/ for a high supply projection. The potential market for bottoming cycle equipment for the two supply projections varied from 170 to 500 units of varying size. Finally, a demonstration program plan was developed.

  3. 2011 Municipal Consortium Northwest Region Workshop Materials | Department

    Energy Savers [EERE]

    of Energy Northwest Region Workshop Materials 2011 Municipal Consortium Northwest Region Workshop Materials This page provides links to the presentations given at the DOE Municipal Solid-State Street Lighting Consortium Northwest Region Workshop, held in Seattle July 15, 2011. Presentations and Materials Workshop Agenda Seattle City Light: LED Streetlight Program Case Study Edward Smalley, Seattle City Light; Lok Chan, DKS Associates SSL Not As Simple As It Seems: Things to Know and Things

  4. Energy Department, Northwest Food Processors Association Set Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Efficiency Goals for Industry Energy Department, Northwest Food Processors Association Set Energy Efficiency Goals for Industry PORTLAND, OR - The U.S. Department of Energy (DOE) and the Northwest Food Processors Association today set ambitious goals to reduce energy use and carbon emissions in the industrial sector. DOE Industrial Technologies Program Manager Douglas Kaempf and Northwest Food Processors Association (NWFPA) President David Zepponi signed a Memorandum of Understanding (MOU)

  5. Northwest National Marine Renewable Energy Center (OSUUW) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Northwest National Marine Renewable Energy Center (OSUUW) Northwest National Marine Renewable Energy Center (OSUUW) Northwest National Marine Renewable Energy Center (OSUUW) Office presentation icon 22_nnmrec_batten_final.ppt More Documents & Publications NREL - FY09 Lab Call: Supporting Research and Testing for MHK Presentation from the 2011 Water Program Peer Review FY 09 Lab Call: Research & Assessment for MHK Development 2014 Water Power Program Peer Review Compiled

  6. Now Available: Pacific Northwest Smart Grid Demonstration Project -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Performance Report Volume 1 | Department of Energy Pacific Northwest Smart Grid Demonstration Project - Technology Performance Report Volume 1 Now Available: Pacific Northwest Smart Grid Demonstration Project - Technology Performance Report Volume 1 July 14, 2015 - 1:43pm Addthis The first volume of the technology performance report for the Pacific Northwest Smart Grid Demonstration, a $179 million project that was co-funded by DOE, is now available for downloading. One of 16

  7. Rock the Watt: An Energy Conservation Campaign at Pacific Northwest

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Lab | Department of Energy Rock the Watt: An Energy Conservation Campaign at Pacific Northwest National Lab Rock the Watt: An Energy Conservation Campaign at Pacific Northwest National Lab Case study describes Pacific Northwest National Laboratory's (PNNL) three-month Rock the Watt campaign to reduce energy use at its main campus in Richland, Washington. The campaign objectives were to educate PNNL employees about energy conservation opportunities in their workplace and to motivate

  8. Energy Department, Northwest Food Processors Association Set Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficiency Goals for Industry | Department of Energy Department, Northwest Food Processors Association Set Energy Efficiency Goals for Industry Energy Department, Northwest Food Processors Association Set Energy Efficiency Goals for Industry February 17, 2009 - 12:00am Addthis PORTLAND, OR - The U.S. Department of Energy (DOE) and the Northwest Food Processors Association today set ambitious goals to reduce energy use and carbon emissions in the industrial sector. DOE Industrial Technologies

  9. Praxair extending hydrogen pipeline in Southeast Texas

    SciTech Connect (OSTI)

    Not Available

    1992-08-24

    This paper reports that Praxair Inc., an independent corporation created by the spinoff of Union Carbide Corp.'s Linde division, is extending its high purity hydrogen pipeline system from Channelview, Tex., to Port Arthur, Tex. The 70 mile, 10 in. extension begins at a new pressure swing adsorption (PSA) purification unit next to Lyondell Petrochemical Co.'s Channelview plant. The PSA unit will upgrade hydrogen offgas from Lyondell's methanol plant to 99.99% purity hydrogen. The new line, advancing at a rate of about 1 mile/day, will reach its first customer, Star Enterprise's 250,000 b/d Port Arthur refinery, in September.

  10. Cathodic protection of pipelines in discontinuous permafrost

    SciTech Connect (OSTI)

    Mitchell, C.J.; Wright, M.D.; Waslen, D.W.

    1997-08-01

    This paper discusses the challenges in providing cathodic protection for a pipeline located in an area with discontinuous permafrost. Specific challenges included: unknown time for the permafrost to melt out, unpredictable current distribution characteristics and wet, inaccessible terrain. Based on preliminary pipe-to-soil data, it appears that cathodic protection coverage was achieved in discontinuous permafrost regions without the need of local anodes. Future work is required to verify whether this conclusion can be extended over the course of an annual freeze-thaw cycle.

  11. Natural Gas Imports by Pipeline into the U.S. Form | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    by Pipeline into the U.S. Form Natural Gas Imports by Pipeline into the U.S. Form File Excel Version of Natural Gas Imports by Pipeline into the U.S. Form.xlsx PDF icon PDF Version ...

  12. Northwest public utilities, BPA top five-year energy savings...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Northwest-public-utilities-BPA-top-five-year-energy-savings-target Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects &...

  13. Gas Flux Sampling At Hualalai Northwest Rift Area (Thomas, 1986...

    Open Energy Info (EERE)

    1986) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Gas Flux Sampling At Hualalai Northwest Rift Area (Thomas, 1986) Exploration Activity...

  14. Northwest National Marine Renewable Energy Center | Open Energy...

    Open Energy Info (EERE)

    Marine Renewable Energy Center Jump to: navigation, search Name: Northwest National Marine Renewable Energy Center Address: 4000 15th Ave Place: Seattle, Washington Zip: 98105...

  15. Building America Whole-House Solutions for New Homes: Northwest...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    High-Performance Test Homes Building America Whole-House Solutions for New Homes: Northwest Energy Efficient Manufactured Housing Program High-Performance Test Homes This project ...

  16. Independent Oversight Review, Pacific Northwest National Laboratory- October 2012

    Broader source: Energy.gov [DOE]

    Review of the Department of Energy Office of Science Assessment of the Pacific Northwest National Laboratory Radiochemical Processing Laboratory Criticality Alarm System

  17. Geothermal Energy Resources of Northwest New Mexico | Open Energy...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: Geothermal Energy Resources of Northwest New Mexico Abstract EDITORS NOTE: The material in...

  18. Demonstration of an Enhanced Geothermal System at the Northwest...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    California; 2010 Geothermal Technology Program Peer Review Report Demonstration of an Enhanced Geothermal System at the Northwest Geysers Geothermal Field, California; 2010...

  19. Northwest Basin and Range Geothermal Region | Open Energy Information

    Open Energy Info (EERE)

    Basin and Range Geothermal Region Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Northwest Basin and Range Geothermal Region Details Areas (51) Power Plants (10)...

  20. 2014 Annual Planning Summary for the Pacific Northwest Site Office

    Broader source: Energy.gov [DOE]

    The Pacific Northwest National Laboratory has determined that no new EAs or EISs are expected to commence during the next 12 to 24-month period.

  1. Voluntary Protection Program Review, Pacific Northwest National Laboratory- June 2009

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether the Pacific Northwest National Laboratory is continuing to perform at a level deserving DOE-VPP Star recognition.

  2. Building America Case Study: Northwest Energy Efficient Manufactured...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bonneville Power Administration to help four factory builders in the Pacifc Northwest ... Building America Benchmark in a western Washington State marine climate location. The four ...

  3. Micro-Earthquake At Northwest Basin and Range Geothermal Region...

    Open Energy Info (EERE)

    Micro-Earthquake At Northwest Basin and Range Geothermal Region (1976) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At...

  4. Climate, Conservation, and Community in Alaska and Northwest Canada

    Broader source: Energy.gov [DOE]

    Climate, Conservation, and Community in Alaska and Northwest Canada is a joint Landscape Conservation Cooperative (LCC) and Alaska Climate Science Center (AK CSC) conference scheduled for November...

  5. Mercury Vapor At Hualalai Northwest Rift Area (Thomas, 1986)...

    Open Energy Info (EERE)

    The Hualalai lower northwest rift and southern flank were sampled for soil mercury concentration and radon emanation rates (Cox and Cuff, 1981d). The data generated by these...

  6. Power Builds Ships Northwest Hydropower Helps Win World War II

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume One Film Collection Volume Two 75th Anniversary Hydropower in the Northwest Woody Guthrie Videos Strategic Direction Branding & Logos Power of the River History Book...

  7. Time-Domain Electromagnetics At Hualalai Northwest Rift Area...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Time-Domain Electromagnetics At Hualalai Northwest Rift Area (Thomas, 1986) Exploration...

  8. FITCH RATES ENERGY NORTHWEST, WA'S ELECTRIC REV RFDG BONDS 'AA...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    debt (4.1 billion). KEY RATING DRIVERS BONNEVILLE'S OBLIGATION SECURES BONDS: The rating on the Energy Northwest bonds reflects the credit quality of Bonneville and its...

  9. Independent Oversight Review, Pacific Northwest National Laboratory- September 2013

    Broader source: Energy.gov [DOE]

    Review of the Fire Protection Program at Pacific Northwest National Laboratory and the Fire Suppression System at the Radiochemical Processing Laboratory

  10. Direct-Current Resistivity Survey At Hualalai Northwest Rift...

    Open Energy Info (EERE)

    Direct-Current Resistivity Survey At Hualalai Northwest Rift Area (Thomas, 1986) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current...

  11. Direct-Current Resistivity At Hualalai Northwest Rift Area (Thomas...

    Open Energy Info (EERE)

    Direct-Current Resistivity At Hualalai Northwest Rift Area (Thomas, 1986) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current...

  12. Water Sampling At Hualalai Northwest Rift Area (Thomas, 1986...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Water Sampling At Hualalai Northwest Rift Area (Thomas, 1986) Exploration Activity Details...

  13. Northwest Region Clean Energy Application Center

    SciTech Connect (OSTI)

    Sjoding, David

    2013-09-30

    The main objective of the Northwest Clean Energy Application Center (NW CEAC) is to promote and support implementation of clean energy technologies. These technologies include combined heat and power (CHP), district energy, waste heat recovery with a primary focus on waste heat to power, and other related clean energy systems such as stationary fuel cell CHP systems. The northwest states include AK, ID, MT, OR, and WA. The key aim/outcome of the Center is to promote and support implementation of clean energy projects. Implemented projects result in a number of benefits including increased energy efficiency, renewable energy development (when using opportunity fuels), reduced carbon emissions, improved facility economics helping to preserve jobs, and reduced criteria pollutants calculated on an output-based emissions basis. Specific objectives performed by the NW CEAC fall within the following five broad promotion and support categories: 1) Center management and planning including database support; 2) Education and Outreach including plan development, website, target market workshops, and education/outreach materials development 3) Identification and provision of screening assessments & feasibility studies as funded by the facility or occasionally further support of Potential High Impact Projects; 4) Project implementation assistance/trouble shooting; and 5) Development of a supportive clean energy policy and initiative/financing framework.

  14. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Updates and Status Current Status: Up See the MOTD for live up to date information on NERSC systems Open Issues List of known problems and key issues we are actively working on. Read More » Genepool Featured Announcements A list of key Genepool announcements and system changes. Read More » Genepool Email Announcements Archive An archive of email announcements sent to NERSC users regarding Genepool. Read More » Announcements Move data from /projectb/projectdirs 5 March 2014, 3:13 pm

  15. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Updates and Status Current Status: Retired on April 30, 2012 Announcements A list of key Franklin announcements and system changes. Read More » Email Announcements Archive An archive of email announcements sent to NERSC users regarding Franklin. Read More » Franklin Timeline This page records a brief timeline of significant events and user environment changes on Franklin. Read More » Last edited: 2016-04-29 11:34:24

  16. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Updates and Status Current Status: Up Open Issues List of known problems, submitted bug reports and issues we are actively working on. Read More » Hopper Featured Announcements A list of key Hopper announcements and system changes. Read More » Hopper Email Announcements Archive An archive of email announcements sent to NERSC users regarding Hopper. Read More » Announcements Hopper OS upgrade and new SW set to default next Wed, Feb 27 21 February 2013, 10:29 am Hopper scheduled

  17. Alaska Wind Update

    Energy Savers [EERE]

    Alaska Wind Update BIA Providers Conference Dec. 2, 2015 Unalakleet wind farm Energy Efficiency First  Make homes, workplaces and communities energy efficient thru weatherization and efficient lighting/appliances.  Because of PCE, residential rate payers won't see as much benefit from a wind farm as do commercial customers.  Once efficient, pursue renewable energy. Otherwise, money is wasted to build an oversized system.  EE makes economic sense - faster payback (2-3 years vs. 15-20

  18. UPdate THE NE

    Energy Savers [EERE]

    UPdate THE NE January 2014 Edition U.S. Department of Energy's Nuclear Energy University Programs It's not every day graduate students get to meet one of nuclear energy's most important decision makers. Integrated University Program (IUP) Fellows had this opportunity at the 2013 Winter American Nuclear Society (ANS) Meeting this past November in Washington, D.C. Department of Energy Assistant Secretary for Nuclear Energy, Dr. Pete Lyons, greeted IUP Fellows in a special meeting to discuss

  19. Directives Quarterly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    https://www.directives.doe.gov/directives/directives October 2013 DOE O 472.2 Admin Chg 1, Personnel Security - The order establishes requirements that will enable DOE to operate a successful, efficient, cost-effective personnel security program that will ensure accurate, timely and equitable determinations of individuals' eligibility for access to classified information and Special Nuclear Material (SNM). Admin Chg 1, 10-8-13 clarifies ambiguities and updates reference citations. November 2013

  20. Renewable Energy Update

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renewable Energy Update Steve Lindenberg, Senior Advisor June 27, 2012 Message from the President "... I will not walk away from the promise of clean energy. I will not walk away from workers ... I will not cede the wind or solar or battery industry ... It's time ... to double down on a clean energy industry that has never been more promising." - President Obama, State of the Union, 24 January 2012 2 EERE Goals Clean Electricity: 80 percent by 2035 Transportation * Renewable

  1. Leak detection on an ethylene pipeline

    SciTech Connect (OSTI)

    Hamande, A.; Condacse, V.; Modisette, J.

    1995-12-31

    A model-based leak detection system has been in operation on the Solvay et Cie ethylene pipeline from Antwerp to Jemeppe on Sambre since 1989. The leak detection system, which is the commercial product PLDS of Modisette Associations, Inc., was originally installed by the supplier. Since 1991, all system maintenance and configuration changes have been done by Solvay et Cie personnel. Many leak tests have been performed, and adjustments have been made in the configuration and the automatic tuning parameters. The leak detection system is currently able to detect leaks of 2 tonnes/hour in 11 minutes with accurate location. Larger leaks are detected in about 2 minutes. Leaks between 0.5 and 1 tonne per hour are detected after several hours. (The nominal mass flow in the pipeline is 15 tonnes/hour, with large fluctuations.) Leaks smaller than 0.5 tonnes per hour are not detected, with the alarm thresholds set at levels to avoid false alarms. The major inaccuracies of the leak detection system appear to be associated with the ethylene temperatures.

  2. Alamo, TX Natural Gas Imports by Pipeline from Mexico

    Gasoline and Diesel Fuel Update (EIA)

    Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Data Series Area 2009 2010 2011 2012 2013 2014 View History Pipeline Volumes 13,279 4,685 0 0 0 0 1998-2014 Pipeline Prices 4.10 4.30 -- -- -- -- 1998-2014

  3. El Paso, TX Natural Gas Imports by Pipeline from Mexico

    Gasoline and Diesel Fuel Update (EIA)

    Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Data Series Area 1998 1999 2000 2001 2002 View History Pipeline Volumes 996 NA NA NA NA 1998-2002 Pipeline Prices 2.09 1998-1998

  4. Penitas, TX Natural Gas Imports by Pipeline from Mexico

    Gasoline and Diesel Fuel Update (EIA)

    Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Data Series Area 1996 1998 1999 2000 2001 2002 View History Pipeline Volumes 253 40 NA NA NA NA 1996-2002 Pipeline Prices 1.72 2.04 1996-1998

  5. UNEP-Risoe CDM/JI Pipeline Analysis and Database | Open Energy...

    Open Energy Info (EERE)

    Risoe CDMJI Pipeline Analysis and Database (Redirected from UNEP Risoe CDMJI Pipeline Analysis and Database) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: UNEP Risoe...

  6. UNEP-Risoe CDM/JI Pipeline Analysis and Database | Open Energy...

    Open Energy Info (EERE)

    UNEP-Risoe CDMJI Pipeline Analysis and Database Jump to: navigation, search Tool Summary LAUNCH TOOL Name: UNEP Risoe CDMJI Pipeline Analysis and Database AgencyCompany...

  7. Use of look-ahead modeling in pipeline operations

    SciTech Connect (OSTI)

    Wray, B.; O`Leary, C.

    1995-12-31

    Amoco Canada Petroleum Company, Ltd. operates the Cochin pipeline system. Cochin pumps batched liquid ethane, propane, ethylene, butane, and NGL. Operating and scheduling this pipeline is very complex. There are safety considerations, especially for ethylene, which cannot be allowed to drop below vapor pressure. Amoco Canada needs to know where batches are in the line, what pressure profiles will look like into the future, and when batches arrive at various locations along the line. In addition to traditional instrumentation and SCADA, Amoco Canada uses modeling software to help monitor and operate the Cochin pipeline. Two important components of the modeling system are the Estimated Time of Arrival (ETA) and Predictive Model (PM) modules. These modules perform look ahead modeling to assist in operating the Cochin pipeline. The modeling software was first installed for the Cochin system in February of 1994, and was commissioned on August 1, 1994. This paper will discuss how the look ahead modules are used for the Cochin pipeline.

  8. Pipeline in-service relocation engineering manual. Final report

    SciTech Connect (OSTI)

    Rosenfeld, M.J.

    1994-12-31

    When pipeline relocation is necessary, it is a common practice for pipeline operators to move the line while it contains gas or liquid product under pressure in order to avoid taking the line out of service. Reasons for this practice include lowering to accommodate a new crossing, raising for repair or recoating, or moving to avoid encroachment. Such operations increase the longitudinal stresses in the relocated section of pipeline. Usually, this has not caused significant problems. However, at least four pipeline failures have been associated with the movement of pipelines over the years. On October 22, 1991, the DOT Office of Pipeline Safety issued an `Alert Notice` to US pipeline operators urging them to conduct analyses prior to moving a pipeline, regardless of whether the line is in service during the operation or not; to determine the extent to which a pipeline may be safely moved, considering the material toughness as a factor; and specific procedures for the operation. The notice resulted from recommendations by the National Transportation Safety Board following their investigation of the North Blenheim failure. This document in intended to be a reasonably comprehensive manual for engineering a safe relocation of an operating pipeline in service. The major elements of the desired guidelines were perceived to already exist in various industry guidelines, standards, proceedings, and research reports. Those sources were compiled, compared and distilled into recommendations for designing a safe line relocation. This manual supplements existing guidelines such as API RP-1117 rather than superseding them; indeed, the user of this document would benefit by referring to them as well. Observance of recommendations made herein should satisfy the nominal requirements and concerns of regulators. However, this document could not possibly address every conceivable situation which might arise in line relocation, nor is it a substitute for independent engineering judgement.

  9. Pacific Northwest Storms Situation Report # 7

    SciTech Connect (OSTI)

    none,

    2006-12-21

    Despite a small storm that came through the area last night with wind gusts peaking at 45 MPH, progress continues to be made in restoring power to customers who lost power during the December 14-15 storms which hit the Pacific Northwest region. Currently, 95,971 customers remain without power, down from 1.8 million customers. The wind storm which affected the area yesterday was not as bad as previously expected, with the majority of the customer outages in the BC Hydro region, and 3,000 additional customer outages in the Puget Sound Energy service area. The customers without power represent 5 percent of customers in the affected utility service areas of Washington. The majority of customers without power are served by Puget Sound Energy, BC Hydro, and Seattle City Light.

  10. US Releases Updated Plutonium Inventory Report | National Nuclear...

    National Nuclear Security Administration (NNSA)

    Releases Updated Plutonium Inventory Report | National Nuclear Security Administration ... US Releases Updated Plutonium Inventory Report US Releases Updated Plutonium Inventory ...

  11. Comparing Existing Pipeline Networks with the Potential Scale of Future U.S. CO2 Pipeline Networks

    SciTech Connect (OSTI)

    Dooley, James J.; Dahowski, Robert T.; Davidson, Casie L.

    2009-04-20

    There is growing interest regarding the potential size of a future U.S. dedicated carbon dioxide (CO2) pipeline infrastructure if carbon dioxide capture and storage (CCS) technologies are commercially deployed on a large scale within the United States. This paper assesses the potential scale of the CO2 pipeline system needed under two hypothetical climate policies (so called WRE450 and WRE550 stabilization scenarios) and compares this to the extant U.S. pipeline infrastructures used to deliver CO2 for enhanced oil recovery (EOR), and to move natural gas and liquid hydrocarbons from areas of production and importation to markets. The analysis reveals that between 11,000 and 23,000 additional miles of dedicated CO2 pipeline might be needed in the U.S. before 2050 across these two cases. While that is a significant increase over the 3,900 miles that comprise the existing national CO2 pipeline infrastructure, it is critically important to realize that the demand for additional CO2 pipeline capacity will unfold relatively slowly and in a geographically dispersed manner as new dedicated CCS-enabled power plants and industrial facilities are brought online. During the period 2010-2030, the growth in the CO2 pipeline system is on the order of a few hundred to less than a thousand miles per year. In comparison during the period 1950-2000, the U.S. natural gas pipeline distribution system grew at rates that far exceed these projections in growth in a future dedicated CO2 pipeline system. This analysis indicates that the need to increase the size of the existing dedicated CO2 pipeline system should not be seen as a major obstacle for the commercial deployment of CCS technologies in the U.S. Nevertheless, there will undoubtedly be some associated regulatory and siting issues to work through but these issues should not be unmanageable based on the size of infrastructure requirements alone.

  12. NEPA Updates | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NEPA Updates NEPA Updates Subscribe to DOE NEPA - Latest Documents and Notices Subscribe to DOE NEPA News The Office of NEPA Policy and Compliance maintains two notification services which provide you with updates for both: DOE NEPA News - which includes general announcements, and DOE NEPA - Latest Documents and Notices - which includes new project documents and notices posted on this website. You can subscribe to either or both of these services by clicking on panels or links above.

  13. DOE Wind Program Update

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Wind Program Update March 2007 P.J. Dougherty Wind and Hydropower Technologies Program Since the 1970's, DOE has spent just over $1B in developing a market, which will reach over $4B in commercial investment in 2006 alone. Energy Efficiency & Renewable Energy Program works closely with industry to provide the market transformation support and R&D needed to drive wind development. Motivating Factors * U.S. Energy Demand to Increase 40%+ over next 25 Years * $Billions investment required *

  14. Next Update: December 2011

    U.S. Energy Information Administration (EIA) Indexed Site

    Released: December 2010 Next Update: December 2011 by North American Electric Reliability Corporation Region, 2009 and 2010 through 2014 Net Internal Demand (MW) Capacity Resources (MW) Capacity Margin (percent) Net Internal Demand (MW) Capacity Resources (MW) Capacity Margin (percent) Net Internal Demand (MW) Capacity Resources (MW) Capacity Margin (percent) Net Internal Demand (MW) Capacity Resources (MW) Capacity Margin (percent) 2009 713,106 916,449 22.2 46,263 49,239 6.0 35,849 47,529 24.6

  15. Next Update: October 2009

    U.S. Energy Information Administration (EIA) Indexed Site

    7 Released: February 2009 Next Update: October 2009 Table 3a . January Monthly Peak Hour Demand, Actual and Projected by North American Electric Reliability Corporation Region (Megawatts and 2007 Base Year) Texas Power Grid Western Power Grid FRCC MRO NPCC RFC SERC SPP TRE (ERCOT) WECC Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) 2007 613,068

  16. Next Update: October 2010

    U.S. Energy Information Administration (EIA) Indexed Site

    January 2010 Next Update: October 2010 Table 3a . January Monthly Peak Hour Demand, Actual and Projected by North American Electric Reliability Corporation Region, (Megawatts and 2008 Base Year) Texas Power Grid Western Power Grid FRCC MRO NPCC RFC SERC SPP TRE WECC Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) 2008 635,911 41,705 34,462 46,803

  17. Community Relations Plan Update

    Office of Legacy Management (LM)

    8-TAR MAC-MRAP 1.9.1 Monticello Mill Tailings Superfund Site and Monticello Vicinity Properties Superfund Site Monticello, Utah Community Relations Plan Update FY 2001 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Prepared by MACTEC Environmental Restoration Services, LLC Grand Junction, Colorado Work performed under DOE Contract No. DE-AC13-96GJ87335 for the U.S. Department of Energy For more information or to request additional copies of this

  18. Waste Isolation Pilot Plant Update

    Office of Environmental Management (EM)

    Update J. R. Stroble Director, National TRU Program U.S. Department of Energy Carlsbad Field Office National Transportation Stakeholder Forum May 11, 2011 Denver, Colorado 2 2...

  19. Heating Oil and Propane Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Holiday Release Schedule The Heating Oil and Propane Update is produced during the winter heating season, which extends from October through March of each year. The standard ...

  20. Progress Update: TRU Waste Shipping

    ScienceCinema (OSTI)

    Cody, Tom

    2012-06-14

    A progress update at the Savannah River Site. A continued effort on shipping TRU waste to WIPP in Carlsbad, New Mexico.