Powered by Deep Web Technologies
Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Environmental radiation real-time monitoring system permanently installed near Qinshan Nuclear Power Plant  

SciTech Connect

An environmental radiation real-time monitoring system with high pressure ionization chamber was developed. It has been installed permanently in the vicinity of Qinshan Nuclear Power Plant, the first built in mainland China. The system consists of four basic components: environmental radiation monitors; data communication network; a data processing center; and a remote terminal computer situated in Hangzhou. It has provided five million readings of environmental radiation levels as of January 1993. 8 refs., 1 fig., 3 tabs.

Minde Ding; Peiru Sheng; Zhangji Zhi [Suzhou Nuclear Research Institute, Jiangsu (China)

1996-03-01T23:59:59.000Z

2

Evaluation of an Advanced Radiation Shielding Material for Permanent Installation at an Operating Commercial Nuclear Reactor  

Science Conference Proceedings (OSTI)

The industry continues to investigate, validate, and implement new radiation field reduction measures in response to increased emphasis on reducing dose to workers. Many nuclear plants are interested in permanent shielding applications to further reduce personnel exposure and to reduce the recurring effort associated with temporary installations. In 2008, a flexible, impregnated, layered matrix material was identified as a possible material for incorporating a shielding substance. This report provides an...

2010-09-30T23:59:59.000Z

3

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network (OSTI)

capacity installed in the United States through 2009 and representing one of the most comprehensive sources

Barbose, Galen

2011-01-01T23:59:59.000Z

4

SC: Install units produced by the high performance RTU challenge | The  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Solutions Teams » Space Conditioning » Install units Technology Solutions Teams » Space Conditioning » Install units produced by the High Performance Rooftop Unit Challenge that meet the high performance rooftop unit specification Activities Technology Solutions Teams Lighting & Electrical Space Conditioning Plug & Process Loads Food Service Refrigeration Laboratories Energy Management & Information Systems Public Sector Teams Market Solutions Teams Install units produced by the High Performance Rooftop Unit Challenge that meet the high performance rooftop unit specification In January 2011, the U.S. Department of Energy (DOE) joined industry partners in the Better Buildings Alliance to release a design specification for 10-ton capacity commercial air conditioners, also known as rooftop units (RTUs).

5

Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010  

E-Print Network (OSTI)

capacity installed in the United States through 2010 and representing one of the most comprehensive sources

Darghouth, Naim

2012-01-01T23:59:59.000Z

6

Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility  

Science Conference Proceedings (OSTI)

Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

Jack Q. Richardson

2012-06-28T23:59:59.000Z

7

Experience in the installation of a microprocessor system for controlling converter units of the Vyborg substation  

SciTech Connect

The experience in the installation of modern digital systems for controlling converter units at the Vyborg converter substation on the basis of advanced microprocessor devices is considered. It is shown that debugging of a control and protection system on mathematical and physical models does not guarantee optimum control of actual converter devices. Examples of advancing the control and protection system are described, the necessity for which has become obvious in tests of actual equipment. Comparison of oscillograms of processes before optimization of the control system and after its optimization and adjustment shows that the digital control system makes it possible to improve substantially the algorithms of control and protection in the short term and without changing the hardware component.

Gusakovskii, K. B.; Zmaznov, E. Yu.; Katantsev, S. V.; Mazurenko, A. K.; Mestergazi, V. A.; Prochan, G. G.; Funtikova, S. F. [High Voltage Direct Current Power Transmission Research Institute (NIIPT) (Russian Federation)

2006-01-15T23:59:59.000Z

8

Geothermal power plants of the United States: a technical survey of existing and planned installations  

DOE Green Energy (OSTI)

The development of geothermal energy as a source of electric power in the United States is reviewed. A thorough description is given of The Geysers geothermal power project in northern California. The recent efforts to exploit the hot-water resources of the Mexicali-Imperial Rift Valley are described. Details are given concerning the geology of the several sites now being used and for those at which power plants will soon be built. Attention is paid to the technical particulars of all existing plants, including wells, gathering systems, energy conversion devices, materials, environmental impacts, economics and operating characteristics. Specifically, plants which either exist or are planned for the following locations are covered: The Geysers, CA; East Mesa, CA; Heber, CA; Roosevelt Hot Springs, UT; Valles Caldera, NM; Salton Sea, CA; Westmorland, CA; Brawley, CA; Desert Peak, NV; and Raft River, ID. The growth of installed geothermal electric generating capacity is traced from the beginning in 1960 and is projected to 1984.

DiPippo, R.

1978-04-01T23:59:59.000Z

9

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

DOE Green Energy (OSTI)

Installations of solar photovoltaic (PV) systems have been growing at a rapid pace in recent years. In 2009, approximately 7,500 megawatts (MW) of PV were installed globally, up from approximately 6,000 MW in 2008, consisting primarily of grid-connected applications. With 335 MW of grid-connected PV capacity added in 2009, the United States was the world's fourth largest PV market in 2009, behind Germany, Italy, and Japan. The market for PV in the United States is driven by national, state, and local government incentives, including up-front cash rebates, production-based incentives, requirements that electricity suppliers purchase a certain amount of solar energy, and federal and state tax benefits. These programs are, in part, motivated by the popular appeal of solar energy, and by the positive attributes of PV - modest environmental impacts, avoidance of fuel price risks, coincidence with peak electrical demand, and the possible deployment of PV at the point of use. Given the relatively high cost of PV, however, a key goal of these policies is to encourage cost reductions over time. Therefore, as policy incentives have become more significant and as PV deployment has accelerated, so too has the desire to track the installed cost of PV systems over time, by system characteristics, by system location, and by component. Despite the significant year-on-year growth, however, the share of global and U.S. electricity supply met with PV remains small, and annual PV additions are currently modest in the context of the overall electric system. To address this need, Lawrence Berkeley National Laboratory initiated a report series focused on describing trends in the installed cost of grid-connected PV systems in the United States. The present report, the third in the series, describes installed cost trends from 1998 through 2009, and provides preliminary cost data for systems installed in 2010. The analysis is based on project-level cost data from approximately 78,000 residential and non-residential PV systems in the U.S., all of which are installed at end-use customer facilities (herein referred to as 'customer-sited' systems). The combined capacity of systems in the data sample totals 874 MW, equal to 70% of all grid-connected PV capacity installed in the United States through 2009 and representing one of the most comprehensive sources of installed PV cost data for the U.S. The report also briefly compares recent PV installed costs in the United States to those in Germany and Japan. Finally, it should be noted that the analysis presented here focuses on descriptive trends in the underlying data, serving primarily to summarize the data in tabular and graphical form; later analysis may explore some of these trends with more-sophisticated statistical techniques. The report begins with a summary of the data collection methodology and resultant dataset (Section 2). The primary findings of the analysis are presented in Section 3, which describes trends in installed costs prior to receipt of any financial incentives: over time and by system size, component, state, system ownership type (customer-owned vs. third party-owned), host customer segment (residential vs. commercial vs. public-sector vs. non-profit), application (new construction vs. retrofit), and technology type (building-integrated vs. rack-mounted, crystalline silicon vs. thin-film, and tracking vs. fixed-axis). Section 4 presents additional findings related to trends in PV incentive levels over time and among states (focusing specifically on state and utility incentive programs as well as state and federal tax credits), and trends in the net installed cost paid by system owners after receipt of such incentives. Brief conclusions are offered in the final section, and several appendices provide additional details on the analysis methodology and additional tabular summaries of the data.

Barbose, Galen; Darghouth, Naim; Wiser, Ryan

2010-12-13T23:59:59.000Z

10

Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010  

SciTech Connect

The present report describes installed cost trends for grid-connected PV projects installed from 1998 through 2010 (with some limited and preliminary results presented for projects installed in the first six months of 2011). The analysis is based on project-level cost data from approximately 116,500 residential, non-residential, and utility-sector PV systems in the United States. The inclusion of utility-sector PV is a new element in this years report. The combined capacity of all systems in the data sample totals 1,685 MW, equal to 79% of all grid-connected PV capacity installed in the United States through 2010 and representing one of the most comprehensive sources of installed PV cost data for the U.S. Based on this dataset, the report describes historical installed cost trends over time, and by location, market segment, technology type, and component. The report also briefly compares recent PV installed costs in the United States to those in Germany and Japan, and describes trends in customer incentives for PV installations and net installed costs after receipt of such incentives. The analysis presented here focuses on descriptive trends in the underlying data, serving primarily to summarize the data in tabular and graphical form.

Darghouth, Naim; Wiser, Ryan

2011-09-07T23:59:59.000Z

11

Report on Preliminary Engineering Study for Installation of an Air Cooled Steam Condenser at Brawley Geothermal Plant, Unit No. 1  

SciTech Connect

The Brawley Geothermal Project comprises a single 10 MW nominal geothermal steam turbine-generator unit which has been constructed and operated by the Southern California Edison Company (SCE). Geothermal steam for the unit is supplied through contract by Union Oil Company which requires the return of all condensate. Irrigation District (IID) purchases the electric power generated and provides irrigation water for cooling tower make-up to the plant for the first-five years of operation, commencing mid-1980. Because of the unavailability of irrigation water from IID in the future, SCE is investigating the application and installation of air cooled heat exchangers in conjunction with the existing wet (evaporative) cooling tower with make-up based on use of 180 gpm (nominal) of the geothermal condensate which may be made available by the steam supplier.

1982-03-01T23:59:59.000Z

12

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network (OSTI)

from 1998-2009 Tracking the Sun III: The Installed Cost ofSystems MW Total Tracking the Sun III: The Installed Cost ofthrough 2009. Tracking the Sun III: The Installed Cost of

Barbose, Galen

2011-01-01T23:59:59.000Z

13

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network (OSTI)

wholesale module prices and PV system installations (owinglag between wholesale module price movements and PV systemmodule prices and retail installed costs for PV systems, the

Barbose, Galen

2011-01-01T23:59:59.000Z

14

Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010  

NLE Websites -- All DOE Office Websites (Extended Search)

Tracking Tracking the Sun IV Tracking the Sun IV An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010 Photovoltaics in the United States from 1998 to 2010 Galen Barbose, Naïm Darghouth, Ryan Wiser, and Joachim Seel g y Lawrence Berkeley National Laboratory - Report Summary - p y September 2011 Environmental Energy Technologies Division * Energy Analysis Department Thanks to the U.S. DOE's Solar Energy Technologies Program and the Clean Energy States Alliance for supporting this work Project Overview Objective: Using project-level data, evaluate trends in the installed cost of grid-connected PV systems throughout the United States: g y g * Changes in total system installed cost and component-level costs over time * Variation in total installed cost by system size

15

Staff Analysis of Proposed Installation of Two New Selective Catalytic Reduction (SCR) Units on the Projects Two Auxiliary  

E-Print Network (OSTI)

The modification(s) proposed in the petition would install two new Selective Catalytic Reduction (SCR) units on the projects two auxiliary boilers. The addition of a SCR system on each boiler would allow the project to comply with recent changes to the Bay Area Air Quality Management District regulations for emissions of nitrogen oxides (NOx) for auxiliary boilers. The Bay Area Air Quality Management District has determined that the project proposal would result in new permit to operate requirements from the district. The Gilroy Cogeneration Project is a 115-megawatt, natural gas-fired power plant located in the City of Gilroy in Santa Clara County. The project was certified by the

Edmund G. Brown

2013-01-01T23:59:59.000Z

16

Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010  

DOE Green Energy (OSTI)

approximately 116,500 residential, non-residential, and utility-sector PV systems in the United States. The inclusion of utility-sector PV is a new element in this years report. The combined capacity of all systems in the data sample totals 1,685 MW, equal to 79% of all grid-connected PV capacity installed in the United States through 2010 and representing one of the most comprehensive sources of installed PV cost data for the U.S. Based on this dataset, the report describes historical installed cost trends over time, and by location, market segment, technology type, and component. The report also briefly compares recent PV installed costs in the United States to those in Germany and Japan, and describes trends in customer incentives for PV installations and net installed costs after receipt of such incentives. The analysis presented here focuses on descriptive trends in the underlying data, serving primarily to summarize the data in tabular and graphical form.

Darghouth, Naim; Wiser, Ryan

2011-09-07T23:59:59.000Z

17

Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010  

NLE Websites -- All DOE Office Websites (Extended Search)

IV IV An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010 Galen Barbose Naïm Darghouth Ryan Wiser Joachim Seel September 2011 Tracking the Sun IV Contents An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010 Environmental Energy Technologies Division, Lawrence Berkeley National Laboratory Primary Authors: Galen Barbose, Naïm Darghouth, Ryan Wiser, and Joachim Seel Executive Summary ...................................................................................................... 1 1. Introduction .............................................................................................................. 5 2. Data Summary .......................................................................................................... 8

18

Departments of Energy, Defense Partner to Install Fuel Cell Backup...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at...

19

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network (OSTI)

the U.S. from 1998-2009 Tracking the Sun III: The InstalledMW No. Systems MW Total Tracking the Sun III: The Installedbuilding-integrated, tracking, non-tracking, crystalline,

Barbose, Galen

2011-01-01T23:59:59.000Z

20

Permanent Magnet Materials  

Science Conference Proceedings (OSTI)

Table 4   Applications of permanent magnet materials...material Primary reason for selection Alternative material Condition or reason favoring selection of alternative material Aircraft magnetos, military or civilian SmCo Maximum energy per unit volume Cast Alnico 5 Availability or cost restraint Alternators SmCo Compactness and reliability Ferrite...

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Permanent Magnet Materials  

Science Conference Proceedings (OSTI)

Table 4 Applications of permanent magnet materials...material Primary reason for selection Alternative material Condition or reason favoring selection of alternative material Aircraft magnetos, military or civilian SmCo Maximum energy per unit volume Cast Alnico 5 Availability or cost restraint Alternators SmCo Compactness and reliability Ferrite...

22

Permanent Markers Implementation Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

WIPP 04-3302 WIPP 04-3302 Permanent Markers Implementation Plan August 19, 2004 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico DOE/WIPP 04-3302 ii Permanent Markers Implementation Plan Waste Isolation Pilot Plant Carlsbad, New Mexico August 19, 2004 Prepared for: Washington Regulatory and Environmental Services an affiliate of Washington TRU Solutions, LLC P.O. Box 2078 Carlsbad, New Mexico 88221 Prepared by: John Hart and Associates, P.A. 2815 Candelaria Road, N.W. Albuquerque, New Mexico 87107 (505) 344-7868 DOE/WIPP 04-3302 iii Table of Contents Table of Contents.................................................................................................

23

Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010  

E-Print Network (OSTI)

in 2007-2010. Tracking the Sun IV: The Installed Cost of$/W) Total Tracking the Sun IV: The Installed Cost of$/W) Total Tracking the Sun IV: The Installed Cost of

Darghouth, Naim

2012-01-01T23:59:59.000Z

24

Well Installation Report for Corrective Action Unit 443, Central Nevada Test Area, Nye County, Nevada, Rev. No.: 0  

SciTech Connect

A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites, Corrective Action Unit 443'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first phase involved the gathering and interpretation of geologic and hydrogeologic data, and inputting the data into a three-dimensional numerical model to depict groundwater flow. The output from the groundwater flow model was used in a transport model to simulate the migration of a radionuclide release (Pohlmann et al., 2000). The second phase of modeling (known as a Data Decision Analysis [DDA]) occurred after NDEP reviewed the first model. This phase was designed to respond to concerns regarding model uncertainty (Pohll and Mihevc, 2000). The third phase of modeling updated the original flow and transport model to incorporate the uncertainty identified in the DDA, and focused the model domain on the region of interest to the transport predictions. This third phase culminated in the calculation of contaminant boundaries for the site (Pohll et al., 2003). Corrective action alternatives were evaluated and an alternative was submitted in the ''Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface'' (NNSA/NSO, 2004). Based on the results of this evaluation, the preferred alternative for CAU 443 is Proof-of-Concept and Monitoring with Institutional Controls. This alternative was judged to meet all requirements for the technical components evaluated and will control inadvertent exposure to contaminated groundwater at CAU 443.

Tim Echelard

2006-01-01T23:59:59.000Z

25

Military installations  

Science Conference Proceedings (OSTI)

This report has reviewed the use of U.S. coal at DOD installations in West Germany. DOD reported that between April 1, 1988, and December 31, 1988, it had between 306,000 and 419,000 tons of U.S. coal stored in Germany. About two-thirds of that was anthracite coal. GAO visited six coal-handling locations that accounted for 72 to 79 percent of the total U.S. coal between April and December 1988. This report could not verify the official inventory records at five locations - two Air Force and three Army - for several reasons, including a lack of required physical inventories of coal for recent years. DOD's coal consumption data for fiscal year 1988 appeared to be accurate since it matched the data reported on source documents maintained at the installations and their commands. According to reported DOD coal inventory and consumption data, as of September 30, 1988, DOD had enough anthracite coal on hand to satisfy projected demands through at least fiscal year 1993, given that no additional heating plant conversions other than those already approved occur and no additional shipments of coal occur. DOD said that as of September 30, 1988, it facilities in Germany had enough anthracite coal on hand to last a minimum of five years.

Not Available

1990-03-01T23:59:59.000Z

26

NIST Net installation instructions  

Science Conference Proceedings (OSTI)

... Xaw3d, and neXtaw; Build and install the nistnet module, API library, and user interface make make install; Try things out ...

2013-09-12T23:59:59.000Z

27

PETSc: Documentation: Installation  

NLE Websites -- All DOE Office Websites (Extended Search)

Installation Home Download Features Documentation Manual pages and Users Manual Citing PETSc Tutorials Installation AMS Changes Bug Reporting Code Management FAQ License Linear...

28

1980 Active-Solar Installations Survey  

SciTech Connect

The survey covers active solar installations made during and prior to calendar year 1980. As the first survey of active solar installations in the United States, the objective was to establish a national baseline information system that could provide current data on residential and commercial active solar installations as well as a listing of firms involved in the active solar industry, including installers. Potential respondents were identified from regional lists of solar equipment dealers and installers compiled by each Regional Solar Energy Center (RSEC). The RSEC lists were computerized and combined into a mailing list of 5466 company names and addresses. An additional 1619 referrals, were provided by survey respondents from the RSEC list. However, because of resource constraints, 981 of these referrals were not included in the survey. To substantiate that the results of this survey represent accurate statistics on the number of active solar installations in the United States, a comparison was made to the Solar Collector Manufacturing Survey installations. (PSB)

1982-10-01T23:59:59.000Z

29

Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010  

E-Print Network (OSTI)

indicative of SREC prices that PV projects would receiveSolar Photovoltaic (PV) System Prices in the United States.average wholesale PV module prices in each year. Over the

Darghouth, Naim

2012-01-01T23:59:59.000Z

30

installed capacity | OpenEI  

Open Energy Info (EERE)

installed capacity installed capacity Dataset Summary Description Estimates for each of the 50 states and the entire United States show Source Wind Powering America Date Released February 04th, 2010 (4 years ago) Date Updated April 13th, 2011 (3 years ago) Keywords annual generation installed capacity usa wind Data application/vnd.ms-excel icon Wind potential data (xls, 102.4 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Other or unspecified, see optional comment below Comment Work of the U.S. Federal Government. Rate this dataset Usefulness of the metadata Average vote Your vote Usefulness of the dataset Average vote Your vote Ease of access Average vote Your vote Overall rating Average vote Your vote Comments

31

Reflectivity software installation  

Science Conference Proceedings (OSTI)

... First download and unpack the reflectometry source tree. You may need to build and install Tcl/Tk, BLT, TkTable, BWidget and TkCon. ...

32

DOE-DOD Emergency Backup Power Fuel Cell Installations  

Fuel Cell Technologies Publication and Product Library (EERE)

Ths fact sheet describes a collaboration between the departments of Energy and Defense to install and operate 18 fuel cell backup power systems across the United States.

33

Process Improvement at Army Installations  

E-Print Network (OSTI)

Compliance with environmental law is becoming significantly expensive. In the past for convenience of management, compliance and pollution prevention were considered independently from production. Environmental law was introduced to optimize production methods to reduce pollution. Energy conservation opportunities (ECOs) that enhance pollution prevention have been compiled through research at many installations, including United States Army Construction Engineering Research Laboratories (USACERL). Executive Orders require the Army to reduce the use of energy and related environmental impacts by promoting renewable energy technologies. These new energy and environmental directives usually exceed the performance capabilities of DODs currently installed industrial technologies. The majority of DOD industrial activities utilize 40 year-old technologies and facilities. The objective of this project was to conduct a Level II process optimization audit on a munitions manufacturing operation at an Army base to optimize capacity, and energy and environmental performance. This paper reports the outcome and offers insights into process optimization.

Northrup, J.; Smith, E. D.; Lin, M.; Baird, J.

1997-04-01T23:59:59.000Z

34

Property:InstalledCapacity | Open Energy Information  

Open Energy Info (EERE)

InstalledCapacity InstalledCapacity Jump to: navigation, search Property Name InstalledCapacity Property Type Quantity Description Installed Capacity (MW) or also known as Total Generator Nameplate Capacity (Rated Power) Use this property to express potential electric energy generation, such as Nameplate Capacity. The default unit is megawatts (MW). For spatial capacity, use property Volume. Acceptable units (and their conversions) are: 1 MW,MWe,megawatt,Megawatt,MegaWatt,MEGAWATT,megawatts,Megawatt,MegaWatts,MEGAWATT,MEGAWATTS 1000 kW,kWe,KW,kilowatt,KiloWatt,KILOWATT,kilowatts,KiloWatts,KILOWATT,KILOWATTS 1000000 W,We,watt,watts,Watt,Watts,WATT,WATTS 1000000000 mW,milliwatt,milliwatts,MILLIWATT,MILLIWATTS 0.001 GW,gigawatt,gigawatts,Gigawatt,Gigawatts,GigaWatt,GigaWatts,GIGAWATT,GIGAWATTS

35

HVAC Installed Performance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVAC Installed Performance HVAC Installed Performance ESI, Tim Hanes Context * The building envelope has historically been the focus in residential homes. * The largest consumer of energy in residential homes is typically the HVAC system. * Testing the performance of the HVAC system has not been pursued to its full potential. Technical Approach * Currently very little performance testing is being done to the HVAC system. * The only way to know if a HVAC system is operating correctly is to measure the Btu/h. * This should be done at the equipment and at the the system. Recommended Guidance * Training of HVAC technicians, installers, and salespeople is a must. * If only the technician is trained than implementing the change will not happen. * Public awareness of proper installation and its

36

HVAC Installed Performance  

Energy.gov (U.S. Department of Energy (DOE))

This presentation was given at the Summer 2012 DOE Building America meeting on July 25, 2012, and addressed the question HVAC proper installation energy savings: over-promising or under-delivering?"

37

Choosing and Installing Geothermal Heat Pumps | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps June 24, 2012 - 3:55pm Addthis These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos What does this mean for me? Installing a geothermal heat pump is not a do-it-yourself job. When you hire a contractor to install your geothermal heat pump, ask for and check references of installations that are several years old.

38

Choosing and Installing Geothermal Heat Pumps | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps June 24, 2012 - 3:55pm Addthis These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos What does this mean for me? Installing a geothermal heat pump is not a do-it-yourself job. When you hire a contractor to install your geothermal heat pump, ask for and check references of installations that are several years old.

39

Land Use for Wind, Solar, and Geothermal Electricity Generation Facilities in the United States  

Science Conference Proceedings (OSTI)

This report provides data and analysis of the land use associated with utility-scale wind, photovoltaic (PV), concentrating solar power (CSP), and geothermal projects. The analysts evaluated 458 existing or proposed projects, representing (as of 2012 third quarter) 51% of installed wind capacity, 80% of PV and CSP capacity, and all known geothermal power plants in the United States. The report identifies two major land use classes: 1) direct area (land permanently or temporarily disturbed due to ...

2012-12-31T23:59:59.000Z

40

Curating performance installations  

Science Conference Proceedings (OSTI)

In this paper we will examine the use of the digital screen display as a primary form of accessing information within the museum context. We will argue that this mode of dissemination, achieved primarily through a Graphic User Interface (GUI) though ... Keywords: GUI, becoming, being, content, dissemination, exhibition, experience, form, information, installation, interactivity, interpretation, materiality, museum, nothing, objecthood, performance, performative, re-enactment, screen, technology, trajectory

Daniel Felstead; Kate Bailey

2011-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Textured Polycrystalline Permanent Magnet Nanoflakes  

Science Conference Proceedings (OSTI)

... high electrical resistivity, which will reduce eddy current losses and improve motor efficiency. ... Combinatorial Search of Rare-Earth-Free Permanent Magnets

42

Permanent Magnets for Energy Applications  

Science Conference Proceedings (OSTI)

Mar 13, 2012 ... Magnetic Materials for Energy Applications II: Permanent Magnets for ... to 500% in the last 12 months, the most unstable being the price of Dy.

43

Low pressure turbine installation  

SciTech Connect

Low-pressure turbine installation is described comprising a casing, at least two groups of turbine stages mounted in said casing, each turbine stage having blades so arranged that a flow of steam passes through the respective turbine stages in contraflow manner, partition means in said casing for separating the opposed final stages of said turbine stages from each other, and steam exhausting means opened in the side walls of said casing in a direction substantially perpendicular to the axis of said turbine, said steam exhausting means being connected to condensers.

Iizuka, N.; Hisano, K.; Ninomiya, S.; Otawara, Y.

1976-08-10T23:59:59.000Z

44

Windows Installation Notes for EXPGUI  

Science Conference Proceedings (OSTI)

... These notes describe how GSAS & EXPGUI are installed using separate distribution files for GSAS, EXPGUI and Tcl/Tk. ...

45

Unifluxor: a permanent memory element  

Science Conference Proceedings (OSTI)

The Unifluxor is a new binary permanent memory element which appears to have the advantages of high-speed operation, easy fabrication, and low cost. Unlike cores, twistors, capacitors, and other commonly used memory devices, the Unifluxor does not depend ...

A. M. Renard; W. J. Neumann

1960-05-01T23:59:59.000Z

46

Permanent Load Shift Control Strategies  

NLE Websites -- All DOE Office Websites (Extended Search)

of Permanent Load Shifting for HVAC and other storage assets as it relates to summer on-peak demand, how it can be dynamically and autonomously controlled, and its relationship...

47

HTAR Client Configuration and Installation  

NLE Websites -- All DOE Office Websites (Extended Search)

Configuration and Installation Configuration and Installation HTAR Configuration and Installation HTAR is an archival utility similar to gnu-tar that allows for the archiving and extraction of local files into and out of HPSS. Configuration Instructions This distribution has default configuration settings which will work for most environments. If you want to use the default values (recommended) you can skip to the section labeled INSTALLATION INSTRUCTIONS. In certain environments, for example if your installation is on a machine which has more than one network interface, you may want to change some of these default settings. To help with this, an interactive Configure script is provided. To use it do $ ./Configure prior to installing. Configure will provide a description of the options

48

Guidelines for solar energy installations  

SciTech Connect

Guidelines for solar energy installations are presented. The guideline is published in code form so that it can be used directly as the text of an ordinance to regulate the installation of solar systems. An index contains cross references to sections of existing model codes that are applicable to solar installations. Wind energy systems, passive solar space conditioning systems, photovoltaic systems, and systems involving mechanical compression of refrigerants are not included.

1984-01-01T23:59:59.000Z

49

ASHRAE Installs New Officers, Directors DENVER ASHRAE has installed  

E-Print Network (OSTI)

ASHRAE Installs New Officers, Directors DENVER ­ ASHRAE has installed new officers and directors for 2013-14 at its Annual Meeting held here June 22-26. The ASHRAE Presidential Address is viewable on You is William P. "Bill" Bahnfleth, Ph.D., P.E., Fellow ASHRAE, ASME Fellow, a professor of Architectural

Maroncelli, Mark

50

Task analysis for solar installers  

SciTech Connect

The process focused on the sequential identification and field validation of the tasks actually performed. This method provides an accurate picture of what happens on the roof. Forty-six solar firms were identified as the population; 29 (63%) participated in the validation project. We identified 8 duty areas and 46 tasks. The overall response rate for the occupational task list is 100% except for tasks under the duty of constructing solar collectors. Only eight of the twenty-nine respondents (28%) indicated that solar installers fabricate collectors. This shows that solar installers do not manufacture collectors and only perform tasks directly related to installation. Additional findings from our study indicate that instructional materials designed for solar installers need to be standardized and made task-specific. The tasks identified in this research should form the foundation for a competency-based curriculum for solar water heater installers.

Harrison, J.; LaHart, D.

1982-01-01T23:59:59.000Z

51

WebCAT: Installation Instructions for Windows  

Science Conference Proceedings (OSTI)

... WebCAT. Note: Windows ME does not ship with a webserver; Apache can be installed. Download and Install, Download ...

52

Counterrotating brushless dc permanent magnet motor  

DOE Patents (OSTI)

An brushless DC permanent magnet motor is provided for driving an autonomous underwater vehicle. In one embodiment, the motor comprises four substantially flat stators disposed in stacked relationship, with pairs of the stators being axially spaced and each of the stators comprising a tape-wound stator coil; and a first and second substantially flat rotors disposed between the spaced pairs of stators. Each of the rotors includes an annular array of permanent magnets embedded therein. A first shaft is connected to the first rotor and a second, concentric shaft is connected to the second rotor, and drive unit causes rotation of the two shafts in opposite directions. The second shaft comprises a hollow tube having a central bore therein in which the first shaft is disposed. Two different sets of bearings support the first and second shAfts. In another embodiment, the motor comprises two ironless stators and pairs and rotors mounted no opposite sides of the stators and driven by counterrotating shafts.

Hawsey, R.A.; Bailey, J.M.

1990-12-31T23:59:59.000Z

53

Counterrotating brushless dc permanent magnet motor  

DOE Patents (OSTI)

An brushless DC permanent magnet motor is provided for driving an autonomous underwater vehicle. In one embodiment, the motor comprises four substantially flat stators disposed in stacked relationship, with pairs of the stators being axially spaced and each of the stators comprising a tape-wound stator coil; and a first and second substantially flat rotors disposed between the spaced pairs of stators. Each of the rotors includes an annular array of permanent magnets embedded therein. A first shaft is connected to the first rotor and a second, concentric shaft is connected to the second rotor, and drive unit causes rotation of the two shafts in opposite directions. The second shaft comprises a hollow tube having a central bore therein in which the first shaft is disposed. Two different sets of bearings support the first and second shAfts. In another embodiment, the motor comprises two ironless stators and pairs and rotors mounted no opposite sides of the stators and driven by counterrotating shafts.

Hawsey, R.A.; Bailey, J.M.

1990-01-01T23:59:59.000Z

54

Net Zero Energy Installations (Presentation)  

SciTech Connect

A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.

Booth, S.

2012-05-01T23:59:59.000Z

55

Solar Installation Labor Market Analysis  

DOE Green Energy (OSTI)

The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

Friedman, B.; Jordan, P.; Carrese, J.

2011-12-01T23:59:59.000Z

56

Solar Installation Labor Market Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Installation Labor Installation Labor Market Analysis Barry Friedman National Renewable Energy Laboratory Philip Jordan Green LMI Consulting John Carrese San Francisco Bay Area Center of Excellence Technical Report NREL/TP-6A20-49339 December 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Solar Installation Labor Market Analysis Barry Friedman National Renewable Energy Laboratory Philip Jordan Green LMI Consulting John Carrese San Francisco Bay Area Center of Excellence

57

Cray to Install Cascade System at NERSC  

NLE Websites -- All DOE Office Websites (Extended Search)

Cray to Install Cascade System at NERSC Cray to Install Cascade System at NERSC June 27, 2012 by Richard Gerber (0 Comments) Cray will install a next-generation supercomputer...

58

Installation and Commissioning Automated Demand Response Systems  

E-Print Network (OSTI)

al: Installation and Commissioning Automated Demand ResponseConference on Building Commissioning: April 22 24, 2008al: Installation and Commissioning Automated Demand Response

Kiliccote, Sila; Global Energy Partners; Pacific Gas and Electric Company

2008-01-01T23:59:59.000Z

59

Brand Font Installation Guide Windows XP  

E-Print Network (OSTI)

Brand Font Installation Guide Windows XP Before starting ­ make sure to the specific font folder ­ when Windows detects installable font files, they will show

Stuart, Steven J.

60

Departments of Energy, Defense Partner to Install Fuel Cell Backup Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Departments of Energy, Defense Partner to Install Fuel Cell Backup Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations July 19, 2011 - 4:56pm Addthis The U.S. Department of Energy (DOE) today announced that as part of an interagency partnership with the U.S. Department of Defense (DOD) to strengthen American energy security and develop new clean energy technologies, DOD will be installing and operating 18 fuel cell backup power systems at eight military installations across the country. The Departments will test how the fuel cells perform in real world operations, identify any technical improvements manufacturers could make to enhance performance, and highlight the benefits of fuel cells for emergency backup

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Departments of Energy, Defense Partner to Install Fuel Cell Backup Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Departments of Energy, Defense Partner to Install Fuel Cell Backup Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations July 19, 2011 - 4:56pm Addthis The U.S. Department of Energy (DOE) today announced that as part of an interagency partnership with the U.S. Department of Defense (DOD) to strengthen American energy security and develop new clean energy technologies, DOD will be installing and operating 18 fuel cell backup power systems at eight military installations across the country. The Departments will test how the fuel cells perform in real world operations, identify any technical improvements manufacturers could make to enhance performance, and highlight the benefits of fuel cells for emergency backup

62

Departments of Energy, Defense Partner to Install Fuel Cell Backup Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Departments of Energy, Defense Partner to Install Fuel Cell Backup Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations July 19, 2011 - 11:46am Addthis Washington, D.C. - The U.S. Department of Energy (DOE) today announced that as part of an interagency partnership with the U.S. Department of Defense (DOD) to strengthen American energy security and develop new clean energy technologies, DOD will be installing and operating 18 fuel cell backup power systems at eight military installations across the country. The Departments will test how the fuel cells perform in real world operations, identify any technical improvements manufacturers could make to enhance

63

Departments of Energy, Defense Partner to Install Fuel Cell Backup Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy, Defense Partner to Install Fuel Cell Backup Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations July 19, 2011 - 11:46am Addthis Washington, D.C. - The U.S. Department of Energy (DOE) today announced that as part of an interagency partnership with the U.S. Department of Defense (DOD) to strengthen American energy security and develop new clean energy technologies, DOD will be installing and operating 18 fuel cell backup power systems at eight military installations across the country. The Departments will test how the fuel cells perform in real world operations, identify any technical improvements manufacturers could make to enhance performance, and highlight the benefits of fuel cells for emergency backup

64

Portland Advancing Green Image With Solar Installs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs February 22, 2010 - 12:10pm Addthis Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Joshua DeLung A quick Web search reveals that many sources consider Portland, Ore., to be one of the most green-minded cities in the United States. But large upfront costs have been a barrier for citizens looking to install solar power systems in the past. Now, a neighborhood solar initiative is helping communities organize to get solar discounts, meaning the city could become

65

Portland Advancing Green Image With Solar Installs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs February 22, 2010 - 12:10pm Addthis Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Joshua DeLung A quick Web search reveals that many sources consider Portland, Ore., to be one of the most green-minded cities in the United States. But large upfront costs have been a barrier for citizens looking to install solar power systems in the past. Now, a neighborhood solar initiative is helping communities organize to get solar discounts, meaning the city could become

66

Hg System Operation Review MERIT Pre-Installation Review  

E-Print Network (OSTI)

hydraulic pump · 40 gal vegetable-oil based hydraulic fluid · Hg flow rate 1.6liter/s (24.9gpm) · Piston System Description · Syringe pump · Hydraulic power unit w/control system · Optical diagnostic system Pre-Installation Review 30 Mar 2007 Syringe Pump System · Primary containment - Hg-wetted components

McDonald, Kirk

67

Installation Of Service Connections For Sensors Or Transmitters In Buried Water Pipes  

DOE Patents (OSTI)

A system for installing warning units in a buried pipeline. A small hole is drilled in the ground to the pipeline. A collar is affixed to one of the pipes of the pipeline. A valve with an internal passage is connected to the collar. A hole is drilled in the pipe. A warning unit is installed in the pipe by moving the warning unit through the internal passage, the collar, and the hole in the pipe.

Burnham, Alan K. (Livermore, CA); Cooper, John F. (Oakland, CA)

2006-02-21T23:59:59.000Z

68

Generator Bushing Installation and Maintenance Guide  

Science Conference Proceedings (OSTI)

This report is a comprehensive guide to generator high-voltage bushing (HVB) installation and maintenance.

2008-12-04T23:59:59.000Z

69

Assembling and Installing LRUs for NIF  

SciTech Connect

Within the 192 National Ignition Facility (NIF) beamlines, there are over 7000 large (40 x 40 cm) optical components, including laser glass, mirrors, lenses, and polarizers. These optics are held in large opto-mechanical assemblies called line-replaceable units (LRUs). Each LRU has strict specifications with respect to cleanliness, alignment, and wavefront so that once activated, each NIF beamline will meet its performance requirements. NIF LRUs are assembled, tested, and refurbished in on-site cleanroom facilities. The assembled LRUs weigh up to 1800 kilograms, and are about the size of a phone booth. They are transported in portable clean canisters and inserted into the NIF beampath using robotic transporters. This plug and play design allows LRUs to be easily removed from the beampath for maintenance or upgrades. Commissioning of the first NIF quad, an activity known as NIF Early Light (NEL), has validated LRU designs and architecture, as well as demonstrated that LRUs can be assembled and installed as designed. Furthermore, it has served to develop key processes and tools forming the foundation for NIF s long-term LRU production and maintenance strategy. As we look forward to building out the rest of NIF, the challenge lies in scaling up the production rate while maintaining quality, implementing process improvements, and fully leveraging the learning and experience gained from NEL. This paper provides an overview of the facilities, equipment and processes used to assemble and install LRUs in NIF.

Bonanno, R E

2003-12-31T23:59:59.000Z

70

CNTA_Well_Installation_Report.book  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Security Administration Nuclear Security Administration Nevada Site Office Environmental Restoration Division Nevada Environmental Restoration Project Well Installation Report for Corrective Action Unit 443, Central Nevada Test Area Nye County, Nevada Revision No.: 0 January 2006 Approved for public release; further dissemination unlimited. DOE/NV--1102 Uncontrolled When Printed Available for public sale, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@ntis.gov Online ordering: http://www.ntis.gov/ordering.htm Available electronically at http://www.osti.gov/bridge Available for a processing fee to U.S. Department of Energy and its contractors, in paper, from:

71

Magnetic Microstructures of Novel High Performance Permanent ...  

Science Conference Proceedings (OSTI)

... Nd-Fe-B Permanent Magnets Unique Exchange Bias Induced by Antiferromagnetic Cr-oxide ZnO-graphene Hybrid Quantum Dots Light Emitting Diode...

72

Sacramento area, solar domestic water heater installers survey report  

SciTech Connect

Information regarding generic type, make, and costs of solar domestic water heater (SDWH) systems in the Sacramento, Roseville, and Davis area is reported. Sixteen SDWH installers/do-it-yourself kit dealers were identified and surveyed by phone. The survey participants were divided into three categories: (1) installers in business for one year or longer, (eight firms); (2) installers in business less than one year, (five firms); and (3) SDWH do-it-yourself kit dealers, (three firms). The survey report establishes an average cost for SDWH pump systems for new single family unit production housing (1350 square feet), with hot water demand typical of an average family of four, and roof mounted collectors. For the first two categories, the SDWH system average cost is $2469 (this includes both open loop and heat exchanger systems with circulating pumps). The average cost of the open loop pump system is $2321; whereas, the heat exchanger pump system average cost is $2592. The participants were questioned concerning discounts they would offer to builders purchasing SDWH's in volume. From their responses, an 11% discount for a purchase of ten systems was derived for the first two installers categories. The average cost of an installed SDWH pump system purchased in a volume of ten units is $2201. The average cost of an installed SDWH open loop system is $2066, and a heat exchanger system is $2307. For the third category, the do-it-yourself kit dealers, a 12% discount was derived for a purchase of ten systems. The average cost of a do-it-yourself pump kit when purchased in a volume of ten units is $1481. The average cost of an open loop pump kit is $1386, and a heat exchanger pump kit is $1672.

Hutchcraft, T.

1979-11-01T23:59:59.000Z

73

Disc rotors with permanent magnets for brushless DC motor  

DOE Patents (OSTI)

A brushless dc permanent magnet motor drives an autonomous underwater vehe. In one embodiment, the motor comprises four substantially flat stators in stacked relationship, with pairs of the stators axially spaced, each of the stators comprising a tape-wound stator coil, and first and second substantially flat rotors disposed between the spaced pairs of stators. Each of the rotors includes an annular array of permanent magnets embedded therein. A first shaft is connected to the first rotor and a second, concentric shaft is connected to the second rotor, and a drive unit causes rotation of the two shafts in opposite directions. The second shaft comprises a hollow tube having a central bore in which the first shaft is disposed. Two different sets of bearings support the first and second shafts. In another embodiment, the motor comprises two ironless stators and pairs of rotors mounted on opposite sides of the stators and driven by counterrotating shafts.

Hawsey, Robert A. (Oak Ridge, TN); Bailey, J. Milton (Knoxville, TN)

1992-01-01T23:59:59.000Z

74

System Cost Analysis for an Interior Permanent Magnet Motor  

DOE Green Energy (OSTI)

The objective of this program is to provide an assessment of the cost structure for an interior permanent magnet ('IPM') motor which is designed to meet the 2010 FreedomCAR specification. The program is to evaluate the range of viable permanent magnet materials for an IPM motor, including sintered and bonded grades of rare earth magnets. The study considers the benefits of key processing steps, alternative magnet shapes and their assembly methods into the rotor (including magnetization), and any mechanical stress or temperature limits. The motor's costs are estimated for an annual production quantity of 200,000 units, and are broken out into such major components as magnetic raw materials, processing and manufacturing. But this is essentially a feasibility study of the motor's electromagnetic design, and is not intended to include mechanical or thermal studies as would be done to work up a selected design for production.

Peter Campbell

2008-08-01T23:59:59.000Z

75

SunShot Initiative: Installation and Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

Installation and Performance to Installation and Performance to someone by E-mail Share SunShot Initiative: Installation and Performance on Facebook Tweet about SunShot Initiative: Installation and Performance on Twitter Bookmark SunShot Initiative: Installation and Performance on Google Bookmark SunShot Initiative: Installation and Performance on Delicious Rank SunShot Initiative: Installation and Performance on Digg Find More places to share SunShot Initiative: Installation and Performance on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Balance of Systems Reducing Non-Hardware Costs Lowering Barriers Fostering Growth Installation and Performance Photo of a group of men moving a rectangular solar panel. Energy Secretary Steven Chu watches members of the Solar Instructor

76

Doubly Salient Permanent Magnet Motor Development Review  

Science Conference Proceedings (OSTI)

The research of doubly salient permanent magnet motor (DSPM), arises as the emergence of a novel type mechatronic control of AC drive system. Currently, on the international realm, the studies regarding on this kind of motor mainly focus on calculation ... Keywords: Doubly Salient, Permanent Magnet Motor, AC Variable Speed, Magnetic Materials, Switched Reluctance Motor

Lina Yi, Meng Zhao

2013-09-01T23:59:59.000Z

77

A PERMANENT MAGNET UNDULATOR FOR SPEAR  

E-Print Network (OSTI)

BLOCK Figure 1 LBL - SSRL UNDULATOR BLOCK MAGNETIZATIONtested at LBL for use at SSRL. It was installed in the SPEAR

Halbach, K.

2010-01-01T23:59:59.000Z

78

NREL: Technology Transfer - White Earth Nation Installs Turbines: A Wind  

NLE Websites -- All DOE Office Websites (Extended Search)

White Earth Nation Installs Turbines: A Wind Powering America Success Story White Earth Nation Installs Turbines: A Wind Powering America Success Story February 11, 2013 Almost 8 years after taking the initial steps to harness the wind, the White Earth Nation recently completed the installation of two small wind turbines that will help offset energy costs for Minnesota's largest and most populous Native American reservation. Mike Triplett, economic development planner with the White Earth Development Office, believes that the project represents a unique opportunity for tribal entities in the United States. He noted that tribes don't qualify for tax-based incentives. "And as for working with investors, we never found that to be a viable option," Triplett said. "So we've relied heavily on grants." Funded through nearly $1.8 million in congressional appropriations along

79

AIR LEAKAGE OF NEWLY INSTALLED RESIDENTIAL WINDOWS  

E-Print Network (OSTI)

Through Sash/Frame Cracks . Window Operation Types . . . . .Window Operation Types . . . . .Air Leakage of Installed Windows Scattergram of Field

Weidt, John

2013-01-01T23:59:59.000Z

80

Pending Issues In Decommissioning Of Nuclear Installations In Developing Countries  

E-Print Network (OSTI)

While decommissioning technology and infrastructures are reasonably mature in fully developed countries at the beginning of the third millennium, this is not necessarily the case for some developing countries. It is unfortunate that many of these countries have given little or no attention to early planning and creation of infrastructures for the decommissioning of their nuclear installations, which in many cases are candidates for permanent shutdown in the near future. Critical areas include inter alia (1) poor or no allocation of decommissioning funds, (2) uncertain availability of affordable technologies, (3) unclear definition of roles and responsibilities including lack of regulations, (4) inadequate management and organization techniques, (5) perceived low priority and weak political support, and (6) lack of human and technical resources, particularly in the long term. The International Atomic Energy Agency (IAEA) is a unique forum to identify and address current and prospecti...

Michele Laraia International

2000-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Tracking the Sun V An Historical Summary of the Installed Price...  

NLE Websites -- All DOE Office Websites (Extended Search)

Tracking the Sun V An Historical Summary of the Installed Price of Photovoltaics in the United States from 1998 to 2011 Title Tracking the Sun V An Historical Summary of the...

82

TY RPRT T1 Tracking the Sun VI An Historical Summary of the Installed...  

NLE Websites -- All DOE Office Websites (Extended Search)

Tracking the Sun VI An Historical Summary of the Installed Price of Photovoltaics in the United States from to A1 Galen L Barbose A1 Na m Darghouth A1 Samantha Weaver A1 Ryan H...

83

The Installed Price of Solar Photovoltaic Systems in the U.S...  

NLE Websites -- All DOE Office Websites (Extended Search)

to Decline at a Rapid Pace Tracking the Sun VI August 2013 The installed price of solar photovoltaic (PV) power systems in the United States fell substantially in 2012 and...

84

Tracking the Sun VI: An Historical Summary of the Installed Price...  

NLE Websites -- All DOE Office Websites (Extended Search)

Tracking the Sun VI: An Historical Summary of the Installed Price of Photovoltaics in the United States from 1998 to 2012 Title Tracking the Sun VI: An Historical Summary of the...

85

Stakeholder Engagement and Outreach: U.S. Installed Wind Capacity  

Wind Powering America (EERE)

Education Education Printable Version Bookmark and Share Learn About Wind About Wind Power Locating Wind Power Getting Wind Power Installed Wind Capacity Wind for Schools Project Collegiate Wind Competition School Project Locations Education & Training Programs Curricula & Teaching Materials Resources Installed Wind Capacity This page has maps of the United States that show installed wind capacity by state and its progression. This map shows the installed wind capacity in megawatts. As of September 30, 2012, 51,630 MW have been installed. Alaska, 16 MW; Hawaii, 112 MW; Washington, 2,699 MW; Oregon, 3,153 MW; California, 4,570 MW; Nevada, 152; Idaho, 675 MW; Utah, 325 MW; Arizona, 238 MW; Montana, 395 MW; Wyoming, 1,410 MW; Colorado, 1,805 MW; New Mexico, 778 MW; North Dakota, 1,469 MW; South Dakota, 784 MW; Nebraska, 337 MW; Kansas, 1,877 MW; Oklahoma, 2,400 MW; Texas, 10,929 MW; Minnesota, 2,717 MW; Iowa, 4,536 MW; Missouri, 459 MW; Wisconsin, 636 MW; Illinois, 3,055 MW; Tennessee, 29 MW; Michigan, 515 MW; Indiana, 1,343 MW; Ohio, 420 MW; West Virginia, 583 MW; Pennsylvania, 1,029 MW; Maryland, 120 MW; Delaware, 2 MW; New Jersey, 9 MW; New York, 1,418 MW; Vermont, 46 MW; New Hampshire, 125 MW; Massachusetts, 64 MW; Rhode Island, 3 MW; Maine, 397 MW.

86

Transient Peak Currents in Permanent Magnet Synchronous Motors  

E-Print Network (OSTI)

Transient Peak Currents in Permanent Magnet Synchronous Motors for Symmetrical Short Circuits Terms-- Permanent magnet synchronous motor, short circuit, protection measure, transient behavior I 33095 Paderborn, Germany Abstract--To enable constant-power areas with permanent magnet synchronous

Noé, Reinhold

87

Environmental Assessment Kotzebue Wind Installation Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment \ Kotzebue Wind Installation Project Kotzebue, Alaska U. S. Department of Energy Golden Field Office 16 17 Cole Boulevard Golden, Colorado May 1998 Environmental Assessment Kotzebue Wind Installation Project Kotzebue, Alaska U. S . Department of Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado May 1998 Finding of No Significant Impact Environmental Assessment Kotzebue Wind Installation Project Kotzebue, Alaska F'INDING OF NO SIGNIFICANT IMPACT for KOTZEBUE WIND INSTALLATION PROJECT KOTZEBUE, ALASKA AGENCY: Department of Energy, Golden Field Office ACTION: Finding of No Significant Impact SUMMARY: The DOE is proposing to provide financial .assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska.

88

CSP'960H/CSP-960S Installation Guide  

E-Print Network (OSTI)

CSP'960H/CSP-960S Installation Guide 4-634-979-01 TM Read First! 1^00 - 3lG - 755; #12;CSP-960H/CSP CSP-960H only) J Sony CDU926S CD-R Drive Unit User's Guide Use this manual as a guide to help you. If all the items are not found, please contact your Sony dealer before proceeding. G CSP-960H/960S CD

Kleinfeld, David

89

Open PV Project: Unlocking PV Installation Data (Brochure)  

SciTech Connect

This brochure summarizes the Open PV Project, a collaborative effort of government, industry, and the public to compile a comprehensive database of PV installations in the United States. The brochure outlines the purpose and history of the project as well as the main capabilities and benefits of the online Open PV tool. The brochure also introduces how features of the tool are used, and it describes the sources and characteristics of Open PV's data and data collection processes.

Not Available

2012-04-01T23:59:59.000Z

90

Permanent magnet hydrogen oxygen generating cells  

SciTech Connect

A generating cell for hydrogen and oxygen utilizes permanent magnets and electromagnets. Means are provided for removing gases from the electrodes. Mixing chambers are provided for water and the electrolyte used in the cell.

Harris, M.

1976-07-13T23:59:59.000Z

91

Modeling and optimization of permanent magnetic motors  

E-Print Network (OSTI)

This thesis develops analytic models for the prediction and optimization of radial-flux permanent magnet motor torque and efficiency. It also facilitates the design optimization of electromagnetically-powered rotorcraft ...

Pinkham, Andrew P

2008-01-01T23:59:59.000Z

92

The rope memory: a permanent storage device  

Science Conference Proceedings (OSTI)

A powerful way of increasing the capability and flexibility of digital computing systems is through the use of permanent storage memories. Such memories are also known as readonly memories or NDRO electrically unalterable memories. As an example of the ...

P. Kuttner

1963-11-01T23:59:59.000Z

93

Hybrid-secondary uncluttered permanent magnet machine and ...  

An electric machine (40) has a stator (43), a permanent magnet rotor (38) with permanent magnets (39) and a magnetic coupling uncluttered rotor (46) for inducing a ...

94

Permanent magnet edge-field quadrupole  

DOE Patents (OSTI)

Planar permanent magnet edge-field quadrupoles for use in particle accelerating machines and in insertion devices designed to generate spontaneous or coherent radiation from moving charged particles are disclosed. The invention comprises four magnetized rectangular pieces of permanent magnet material with substantially similar dimensions arranged into two planar arrays situated to generate a field with a substantially dominant quadrupole component in regions close to the device axis.

Tatchyn, Roman O. (Mountain View, CA)

1997-01-01T23:59:59.000Z

95

Axial flux, modular, permanent-magnet generator with a toroidal winding for wind turbine applications  

SciTech Connect

Permanent-magnet generators have been used for wind turbines for many years. Many small wind turbine manufacturers use direct-drive permanent-magnet generators. For wind turbine generators, the design philosophy must cover the following characteristics: low cost, light weight, low speed, high torque, and variable speed generation. The generator is easy to manufacture and the design can be scaled up for a larger size without major retooling. A modular permanent-magnet generator with axial flux direction was chosen. The permanent magnet used is NdFeB or ferrite magnet with flux guide to focus flux density in the air gap. Each unit module of the generator may consist of one, two, or more phases. Each generator can be expanded to two or more unit modules. Each unit module is built from simple modular poles. The stator winding is formed like a torus. Thus, the assembly process is simplified and the winding insertion in the slot is less tedious. The authors built a prototype of one unit module and performed preliminary tests in the laboratory. Follow up tests will be conducted in the lab to improve the design.

Muljadi, E.; Butterfield, C.P.; Wan, Y.H.

1998-07-01T23:59:59.000Z

96

FLUDViz: Installation Instructions for UNIX Source  

Science Conference Proceedings (OSTI)

... details. launches a Tcl/Tk process for the control menu. Thus you need a Tcl/Tk implementation installed on your system. ...

97

Lightning and Surge Protection of Photovoltaic Installations  

Science Conference Proceedings (OSTI)

... installed at the site, for safety, surge protection ... the cells were described as "melted near the metallic ... horizontal distance from the nearest air terminal ...

2013-05-17T23:59:59.000Z

98

WebCAT: Installation Instructions for Windows  

Science Conference Proceedings (OSTI)

... Requirements, WebCAT can be installed on Windows systems running IIS, PWS, or Apache web servers and on Unix systems running Apache. ...

99

NREL: Technology Transfer - Wind Technology Center Installing ...  

Wind Technology Center Installing a Dynamic Duo August 25, 2009. Generating 20 percent of the nation's electricity from clean wind resources will ...

100

Systems Study Of Drilling For Installation Of Geothermal Heat Pumps  

E-Print Network (OSTI)

Geothermal, or ground-source, heat pumps (GHP) are much more efficient than air-source units such as conventional air conditioners. A major obstacle to their use is the relatively high initial cost of installing the heat-exchange loops into the ground. In an effort to identify drivers which influence installation cost, a number of site visits were made during 1996 to assess the state-of-the-art in drilling for GHP loop installation. As an aid to quantifying the effect of various drilling-process improvements, we constructed a spread-sheet based on estimated time and material costs for all the activities required in a typical loop-field installation. By substituting different (improved) values into specific activity costs, the effect on total project costs can be easily seen. This report contains brief descriptions of the site visits, key points learned during the visits, copies of the spread-sheet, recommendations for further work, and sample results from sensitivity analysis using the...

John Finger William; William N. Sullivan; Ronald D. Jacobson; Kenneth G. Pierce

1997-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Systems study of drilling for installation of geothermal heat pumps  

DOE Green Energy (OSTI)

Geothermal, or ground-source, heat pumps (GHP) are much more efficient than air-source units such as conventional air conditioners. A major obstacle to their use is the relatively high initial cost of installing the heat-exchange loops into the ground. In an effort to identify drivers which influence installation cost, a number of site visits were made during 1996 to assess the state-of-the-art in drilling for GHP loop installation. As an aid to quantifying the effect of various drilling-process improvements, we constructed a spread-sheet based on estimated time and material costs for all the activities required in a typical loop-field installation. By substituting different (improved) values into specific activity costs, the effect on total project costs can be easily seen. This report contains brief descriptions of the site visits, key points learned during the visits, copies of the spread-sheet, recommendations for further work, and sample results from sensitivity analysis using the spread-sheet.

Finger, J.T.; Sullivan, W.N.; Jacobson, R.D.; Pierce, K.G.

1997-09-01T23:59:59.000Z

102

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007  

SciTech Connect

As installations of grid-connected solar photovoltaic (PV) systems have grown, so too has the desire to track the installed cost of these systems over time, by system characteristics, by system location, and by component. This report helps to fill this need by summarizing trends in the installed cost of grid-connected PV systems in the United States from 1998 through 2007. The report is based on an analysis of installed cost data from nearly 37,000 residential and non-residential PV systems, totaling 363 MW of capacity, and representing 76percent of all grid-connected PV capacity installed in the U.S. through 2007.

Wiser, Ryan; Barbose, Galen; Peterman, Carla

2009-02-11T23:59:59.000Z

103

Design and installation manual for thermal energy storage  

DOE Green Energy (OSTI)

The purpose of this manual is to provide information on the design and installation of thermal energy storage in active solar systems. It is intended for contractors, installers, solar system designers, engineers, architects, and manufacturers who intend to enter the solar energy business. The reader should have general knowledge of how solar heating and cooling systems operate and knowledge of construction methods and building codes. Knowledge of solar analysis methods such as f-Chart, SOLCOST, DOE-1, or TRNSYS would be helpful. The information contained in the manual includes sizing storage, choosing a location for the storage device, and insulation requirements. Both air-based and liquid-based systems are covered with topics on designing rock beds, tank types, pump and fan selection, installation, costs, and operation and maintenance. Topics relevant to latent heat storage include properties of phase-change materials, sizing the storage unit, insulating the storage unit, available systems, and cost. Topics relevant to heating domestic water include safety, single- and dual-tank systems, domestic water heating with air- and liquid-based space heating systems, and stand alone domestics hot water systems. Several appendices present common problems with storage systems and their solutions, heat transfer fluid properties, economic insulation thickness, heat exchanger sizing, and sample specifications for heat exchangers, wooden rock bins, steel tanks, concrete tanks, and fiberglass-reinforced plastic tanks.

Cole, R L; Nield, K J; Rohde, R R; Wolosewicz, R M

1980-01-01T23:59:59.000Z

104

Tracking the Sun III The Installed Cost of Photovoltaics in the U.S. from  

NLE Websites -- All DOE Office Websites (Extended Search)

Tracking the Sun III The Installed Cost of Photovoltaics in the U.S. from Tracking the Sun III The Installed Cost of Photovoltaics in the U.S. from 1998-2009 Title Tracking the Sun III The Installed Cost of Photovoltaics in the U.S. from 1998-2009 Publication Type Report Refereed Designation Unknown Year of Publication 2010 Authors Barbose, Galen L., Naïm Darghouth, and Ryan H. Wiser Pagination 54 Date Published 12/2010 Publisher LBNL City Berkeley Keywords distributed energy resources (der), electricity markets and policy group, energy analysis and environmental impacts department, energy markets, photovoltaics Abstract As the deployment of grid-connected solar photovoltaic (PV) systems has increased, so too has the desire to track the installed cost of these systems over time and by location, customer type, system characteristics, and component. This report helps to fill this need by summarizing trends in the installed cost1 of grid-connected PV systems in the United States from 1998 through 2009 (updating two previous reports with data through 2007 and 2008, respectively), and providing preliminary cost trends for systems installed in 2010. The analysis is based on installed cost data for approximately 78,000 residential and non-residential PV systems, totaling 874 megawatts (MW) and representing 70% of all grid-connected PV capacity installed in the United States through 2009.

105

Low-Cost Installation of Concentrating Photovoltaic  

E-Print Network (OSTI)

Low-Cost Installation of Concentrating Photovoltaic Renewable Energy Research Renewable Energy Research http://www.energy.ca.gov/research/renewabl e/index.html August 2011 The Issue Several factors inhibit the potential growth of the California photovoltaic market: high installation costs, expenses

106

Photovoltaic Installations at Williams College Ruth Aronoff  

E-Print Network (OSTI)

of thumb that 10 Watts of power fit into every square foot of roof space (or 0.1 square meters). This means of the total array, panels cost between $7.50 and $10 per Watt of power installed; smaller systems cost slightly more to install per Watt, while larger systems cost less since they are bought in bulk

Aalberts, Daniel P.

107

Installation package for the solaron solar subsystems  

DOE Green Energy (OSTI)

This package contains information that is intended to be a guide for installation, operation, and maintenance of the various Solaron Solar Subsystems. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and off-peak storage. Two prototype residential systems have been installed at Akron, Ohio, and Duffield, Virginia.

Not Available

1979-04-01T23:59:59.000Z

108

Installation package for a solar heating system  

DOE Green Energy (OSTI)

Installation information is presented for a solar heating system installed in Concho Indian School at El Reno, Oklahoma. This package includes a system Operation and Maintenance Manual, hardware brochures, schematics, system operating modes and drawings. The Solar Engineering and Equipment Company (SEECO) developed this prototype solar heating system consisting of the following subsystems: solar collectors, control and storage.

Not Available

1978-12-01T23:59:59.000Z

109

Expanding Malware Defense by Securing Software Installations  

E-Print Network (OSTI)

installations. Our technique can support a diversity of package managers and software installers. It is based of the files used by benign software packages, thus blocking the most common mechanism used by malware future runs of an untrusted package will take place within an administrator-specified sandbox. Our

Sekar, R.

110

Homeowner's Guide to Window Air Conditioner Installation for Efficiency and Comfort (Fact Sheet), Building America Case Study: Technology Solutions for Existing Homes, Building Technologies Office (BTO)  

SciTech Connect

This fact sheet offers a step-by-step guide to proper installation of window air conditioning units, in order to improve efficiency and comfort for homeowners.

Not Available

2013-06-01T23:59:59.000Z

111

economic means to permanently store CO  

NLE Websites -- All DOE Office Websites (Extended Search)

economic means to permanently store CO economic means to permanently store CO 2 in unmineable coal seams. Prior to the injection, horizontal coalbed methane (CBM) wells were drilled approximately 1,200 to 1,800 feet underground in a five-spot pattern over a 200-acre area in the unmineable Upper Freeport coal seam. As part of this $13 million field trial, which is being conducted under the collaboration of the National Energy Technology Laboratory (NETL), West Virginia University, and CONSOL Energy, Inc., CO 2 will be injected at a pressure of up to 700 pounds per square inch (psi)

112

Experimental investigation of a solar desiccant cooling installation  

Science Conference Proceedings (OSTI)

Desiccant cooling is a technique based on evaporative cooling and air dehumidification using desiccant regenerated by thermal energy. It is particularly interesting when it is driven by waste or solar heat making this technique environmentally friendly. In this paper, an experimental investigation is carried on a desiccant air handling unit powered by vacuum-tube solar collectors. First, the components are studied under various operating conditions. Then overall performance of the installation is evaluated over a day for a moderately humid climate with regeneration solely by solar energy. In these conditions the overall efficiency of the solar installation is 0.55 while the thermodynamic coefficient of performance is 0.45 and the performance indicator based on the electrical consumption is 4.5. Finally, the impact of outside and regeneration conditions on the performance indicators is studied. (author)

Bourdoukan, P.; Wurtz, E. [LOCIE Laboratoire Optimisation de la Conception et Ingenierie de l'Environnement, Campus Scientifique Universite de Savoie, 73376 Le Bourget du Lac (France); Joubert, P. [LEPTIAB Laboratoire d'Etude des Phenomenes de Transfert et de l'Instantaneite Agro-Industrie et Batiment Pole Sciences et Technologies, Universite La Rochelle, Avenue Marillac 17000 La Rochelle (France)

2009-11-15T23:59:59.000Z

113

Dovetail spoke internal permanent magnet machine  

Science Conference Proceedings (OSTI)

An internal permanent magnet (IPM) machine is provided. The IPM machine includes a stator assembly and a stator core. The stator core also includes multiple stator teeth. The stator assembly is further configured with stator windings to generate a stator magnetic field when excited with alternating currents and extends along a longitudinal axis with an inner surface defining a cavity. The IPM machine also includes a rotor assembly and a rotor core. The rotor core is disposed inside the cavity and configured to rotate about the longitudinal axis. The rotor assembly further includes a shaft. The shaft further includes multiple protrusions alternately arranged relative to multiple bottom structures provided on the shaft. The rotor assembly also includes multiple stacks of laminations disposed on the protrusions and dovetailed circumferentially around the shaft. The rotor assembly further includes multiple pair of permanent magnets for generating a magnetic field, which magnetic field interacts with the stator magnetic field to produce a torque. The multiple pair of permanent magnets are disposed between the stacks. The rotor assembly also includes multiple middle wedges mounted between each pair of the multiple permanent magnets.

Alexander, James Pellegrino (Ballston Lake, NY); EL-Refaie, Ayman Mohamed Fawzi (Niskayuna, NY); Lokhandwalla, Murtuza (Clifton Park, NY); Shah, Manoj Ramprasad (Latham, NY); VanDam, Jeremy Daniel (West Coxsackie, NY)

2011-08-23T23:59:59.000Z

114

When Do Commercial Reactors Permanently Shut Down?  

Reports and Publications (EIA)

For those wishing to obtain current data, the following resources are available: U.S. reactors, go to EIA's nuclear reactor shutdown list. (Note: As of April 30, 2010, the last U.S. reactor to permanently shut down was Big Rock Point in 1997.) Foreign Reactors, go to the Power Reactor Information System (PRIS) on the International Atomic Energy Agency's website.

Information Center

2011-05-10T23:59:59.000Z

115

1981 Active-Solar-Installations Survey  

SciTech Connect

The survey gathered data on active residential and commercial solar systems installed during calendar year 1981 and a listing of firms involved in various aspects of the industry. The mail and telephone followup survey results are presented in 21 tables for combined national and state data. The total number of installations reported nationwide during 1981 was 122,907. Almost 95% of all reported installations were made in the single-family residential sector. The fewest quantity of installations (1.2%) was reported in the commercial sector. The remaining 4% was reported in the multifamily residential sector. Water heaters represented the largest number of systems installed in single-family, multifamily, and commercial buildings. The average size of water-heating systems in single-family homes was 61 square feet with an average cost of $3,235. Pool heaters represented the second largest number of systems installed in single-family and multifamily homes and represented 16.4% of the total installations. The average size of pool heaters in single-family homes was 376 square feet with an average cost of $3,455.

1982-12-01T23:59:59.000Z

116

Experimental Evaluation of Installed Cooking Exhaust Fan Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

Experimental Evaluation of Installed Cooking Exhaust Fan Performance Experimental Evaluation of Installed Cooking Exhaust Fan Performance Title Experimental Evaluation of Installed Cooking Exhaust Fan Performance Publication Type Report LBNL Report Number LBNL-4183E Year of Publication 2010 Authors Singer, Brett C., William W. Delp, and Michael G. Apte Publisher Lawrence Berkeley National Laboratory City Berkeley Keywords airflow & pollutant transport group, cooktop, energy analysis and environmental impacts department, gas burners, indoor air quality, indoor environment department, kitchen, nitrogen dioxide, oven, pollutant emissions, range hood, residential, source control, task ventilation, technology, sustainability and impact assessment group Abstract The installed performance of cooking exhaust fans was evaluated through residential field experiments conducted on a sample of 15 devices varying in design and other characteristics. The sample included two rear downdraft systems, two under-cabinet microwave over range (MOR) units, three different installations of an under-cabinet model with grease screens across the bottom and no capture hood, two devices with grease screens covering the bottom of a large capture hood (one under-cabinet, one wall-mount chimney), four under-cabinet open hoods, and two open hoods with chimney mounts over islands. Performance assessment included measurement of airflow and sound levels across fan settings and experiments to quantify the contemporaneous capture efficiency for the exhaust generated by natural gas cooking burners. Capture efficiency is defined as the fraction of generated pollutants that are removed through the exhaust and thus not available for inhalation of household occupants. Capture efficiency (CE) was assessed for various configurations of burner use (e.g. single front, single back, combination of one front and one back, oven) and fan speed setting. Measured airflow rates were substantially lower than the levels noted in product literature for many of the units. This shortfall was observed for several units costing in excess of $1000. Capture efficiency varied widely (from <5% to roughly 100%) across devices and across conditions for some devices. As expected, higher capture efficiencies were achieved with higher fan settings and the associated higher air flow rates. In most cases, capture efficiencies were substantially higher for rear burners than for front burners. The best and most consistent performance was observed for open hoods that covered all cooktop burners and operated at higher airflow rates. The lowest capture efficiencies were measured when a front burner was used with a rear backdraft system or with lowest fan setting for above the range systems that do not cover the front burners.

117

Energy Conservation Installation Credit | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Conservation Installation Credit Energy Conservation Installation Credit Energy Conservation Installation Credit < Back Eligibility Multi-Family Residential Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heating Home Weatherization Commercial Weatherization Sealing Your Home Cooling Design & Remodeling Windows, Doors, & Skylights Ventilation Heat Pumps Appliances & Electronics Commercial Lighting Lighting Water Heating Maximum Rebate 500 per individual; up to 1,000 for a married couple filing jointly Program Info State Montana Program Type Personal Tax Credit Rebate Amount 25% of cost of capital investment Provider Montana Department of Revenue Individual taxpayers may claim a credit against their tax liability for up to 25% of the costs of investment for energy conservation purposes in a

118

Permanent isolation surface barrier development plan  

Science Conference Proceedings (OSTI)

The exhumation and treatment of wastes may not always be the preferred alternative in the remediation of a waste site. In-place disposal alternatives, under certain circumstances, may be the most desirable alternatives to use in the protection of human health and the environment. The implementation of an in-place disposal alternative will likely require some type of protective covering that will provide long-term isolation of the wastes from the accessible environment. Even if the wastes are exhumed and treated, a long-term barrier may still be needed to adequately dispose of the treated wastes or any remaining waste residuals. Currently, no {open_quotes}proven{close_quotes} long-term barrier is available. The Hanford Site Permanent Isolation Surface Barrier Development Program (BDP) was organized to develop the technology needed to provide a long-term surface barrier capability for the Hanford Site. The permanent isolation barrier technology also could be used at other sites. Permanent isolation barriers use engineered layers of natural materials to create an integrated structure with redundant protective features. Drawings of conceptual permanent isolation surface barriers are shown. The natural construction materials (e.g., fine soil, sand, gravel, riprap, asphalt) have been selected to optimize barrier performance and longevity. The objective of current designs is to use natural materials to develop a maintenance-free permanent isolation surface barrier that isolates wastes for a minimum of 1,000 years by limiting water drainage to near-zero amounts; reducing the likelihood of plant, animal, and human intrusion; controlling the exhalation of noxious gases; and minimizing erosion-related problems.

Wing, N.R.

1994-01-01T23:59:59.000Z

119

Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.  

SciTech Connect

Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

2011-12-01T23:59:59.000Z

120

DOE Guidance - Permanent and Nonpermanent Positions, Appointments, &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance - Permanent and Nonpermanent Positions, Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes DOE Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes Guidance Memorandum #23 DOE Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes This document provides assistance in determining whether a new position should be designated as permanent or nonpermanent (temporary), to provide examples of the various types of appointments and personnel actions that can be used with position determinations, and to define the associated Corporate Human Resource Information System (CHRIS) position codes. Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes Responsible Contacts Bruce Murray HR Policy Advisor E-mail bruce.murray@hq.doe.gov

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

DOE Guidance - Permanent and Nonpermanent Positions, Appointments, &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance - Permanent and Nonpermanent Positions, Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes DOE Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes Guidance Memorandum #23 DOE Guidance - Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes This document provides assistance in determining whether a new position should be designated as permanent or nonpermanent (temporary), to provide examples of the various types of appointments and personnel actions that can be used with position determinations, and to define the associated Corporate Human Resource Information System (CHRIS) position codes. Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes Responsible Contacts Bruce Murray HR Policy Advisor E-mail bruce.murray@hq.doe.gov

122

Performance of Installed Cooking Exhaust Devices  

NLE Websites -- All DOE Office Websites (Extended Search)

Performance of Installed Cooking Exhaust Devices Performance of Installed Cooking Exhaust Devices Brett C. Singer, William W. Delp, Michael G. Apte, Philip N. Price Environmental Energy Technologies Division Lawrence Berkeley National Laboratory Berkeley, California, 94720 November 2011 Direct funding for this research was provided by the California Energy Commission through Contracts 500-05-026 and 500-08-061. Institutional support is provided to LBNL by the U.S. Department of Energy, Office of Science under Contract DE-AC02-05CH11231. LBNL-5265E-r1(3) Singer et al., Performance of Installed Cooking Exhaust Devices LBNL-5265E-r1(3) Performance of Installed Cooking Exhaust Devices Brett C. Singer 1

123

Installed Geothermal Capacity | Open Energy Information  

Open Energy Info (EERE)

Geothermal Capacity Geothermal Capacity Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Print PDF Installed Geothermal Capacity International Market Map of U.S. Geothermal Power Plants List of U.S. Geothermal Power Plants Throughout the world geothermal energy is looked at as a potential source of renewable base-load power. As of 2005 there was 8,933 MW of installed power capacity within 24 countries. The International Geothermal Association (IGA) reported 55,709 GWh per year of geothermal electricity. The generation from 2005 to 2010 increased to 67,246 GWh, representing a 20% increase in the 5 year period. The IGA has projected that by 2015 the new installed capacity will reach 18,500 MW, nearly 10,000 MW greater than 2005. [1] Countries with the greatest increase in installed capacity (MW) between

124

File:Install.pdf | Open Energy Information  

Open Energy Info (EERE)

Install.pdf Install.pdf Jump to: navigation, search File File history File usage File:Install.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 86 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 13:48, 1 November 2012 Thumbnail for version as of 13:48, 1 November 2012 1,275 × 1,650 (86 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file. Retrieved from "http://en.openei.org/w/index.php?title=File:Install.pdf&oldid=53281

125

Install an Automatic Blowdown Control System  

SciTech Connect

This revised ITP steam tip sheet on installing automatic blowdown controls provide how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

126

Peoples Gas Single Family Direct Install (Illinois)  

Energy.gov (U.S. Department of Energy (DOE))

Owners of single-family homes, condos, townhomes and two-flats may be eligible for a free installation of new programmable thermostats, pipe insulation, showerheads, and faucet aerators through...

127

Install Removable Insulation on Valves and Fittings  

Science Conference Proceedings (OSTI)

This revised ITP tip sheet on installing removable insulation on valves and fittings provides how-to advice for improving the system using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

128

Performance improvement of permanent magnet ac motors  

E-Print Network (OSTI)

Multi-phase motors have several advantages over the traditional three-phase motors. In this study, the additional degrees of freedom available in five-phase permanent magnet motors have been used for three purposes: 1) enhancing the torque producing capability of the motor, 2) improving the reliability of the system, and 3) better adjusting of the torque and flux linkages of the five-phase direct torque controlled system. 1) Due to the fact that space and time harmonics of the same orders will contribute positively to output torque, a five-phase permanent magnet motor with quasi-rectangular back-EMF waveform is supplied with combined fundamental and third harmonic of currents. For modeling and analysis of the motor a 0 3 3 1 1 q d q d frame of reference is defined where 1 1q d rotates at the synchronous speed and 3 3q d rotates at the three times synchronous speed. Based on the mathematical model in the 0 3 3 1 1 q d q d frame of reference, it is shown that this system while having a higher torque density with respect to a conventional permanent magnet synchronous machine, is also compatible with vector control algorithm. 2) A resilient current control of the five-phase permanent motor with both sinusoidal and trapezoidal back-EMF waveforms under asymmetrical fault condition is proposed. In this scheme, the stator MMF is kept unchanged during healthy and faulty condition. Therefore, the five-phase permanent magnet motor operates continuously and steadily without additional hardware and just by modifying the control algorithm in case of loss of up to two phases. The feature is of major importance in some specific applications where high reliability is required. 3) High torque and flux ripple are the major drawbacks of a three-phase direct torque controlled system. The number of space voltage vectors directly influences the performance of DTC system. A five-phase drive, while benefiting from other advantages of high order phase drives, has inherently 32 space voltage vectors which permits better flexibility in selecting the switching states and finer adjustment of flux and torque. A sensorless direct torque control of five-phase permanent magnet motor is implemented. Speed information is obtained based on the position of stator flux linkages and load angle. Experiments have been conducted on a 5kW five-phase surface mount permanent magnet motor and a 3kW five-phase interior permanent magnet motor by using TMS320C32 DSP. The results obtained are consistent with theoretical studies and simulation analysis, which further demonstrate the feasibility and practical significance of the five-phase permanent magnet motor drives.

Parsa, Leila

2005-05-01T23:59:59.000Z

129

CATEGORICAL EXCLUSION FOR INSTALLING A PHOTOVOLTAIC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-PNSO-0657 -PNSO-0657 CATEGORICAL EXCLUSION FOR INSTALLING A PHOTOVOLTAIC POWER GENERATION ARRAY AND ELECTRIC CAR CHARGING STATIONS, ENVIRONMENTAL MOLECULAR SCIENCES LABORATORY, PACIFIC NORTHWEST SITE OFFICE, RICHLAND, WASHINGTON Proposed Action The U.S. Department of Energy (DOE), Pacific Northwest Site Office (PNSO) proposes to install a photovoltaic power generation array and electric car charging stations. Location of Action The proposed action would occur in a landscaped infiltration swale located immediately

130

Riser, pipelines installed in Griffin field  

Science Conference Proceedings (OSTI)

A mooring riser and flow lines along with a 67-km, 8-in., gas-export pipelines have been installed offshore Australia for BHP Petroleum's Griffin field development. The 66-km gas line will carry Griffin field gas to an onshore gas-processing plant. Completing the projects ahead of schedule was Clough Stena Joint Venture (Asia), Perth. BHP awarded the contracts in early 1993; the project was completed in January this year. The paper describes the contractor, pipeline installation, and handling equipment.

Not Available

1994-05-23T23:59:59.000Z

131

Installed Geothermal Capacity/Data | Open Energy Information  

Open Energy Info (EERE)

Installed Geothermal Capacity/Data Installed Geothermal Capacity/Data < Installed Geothermal Capacity Jump to: navigation, search Download a CSV file of the table below: CSV FacilityType Owner Developer EnergyPurchaser Place GeneratingCapacity NumberOfUnits CommercialOnlineDate HeatRate WindTurbineManufacturer FacilityStatus Aidlin Geothermal Facility Geothermal Steam Power Plant Calpine Geysers Geothermal Area 20 MW20,000 kW 20,000,000 W 20,000,000,000 mW 0.02 GW 2.0e-5 TW 2 1989 Amedee Geothermal Facility Binary Cycle Power Plant Amedee Geothermal Venture Honey Lake, California 1.6 MW1,600 kW 1,600,000 W 1,600,000,000 mW 0.0016 GW 1.6e-6 TW 2 1988 BLM Geothermal Facility Double Flash Coso Operating Co. Coso Junction, California, 90 MW90,000 kW 90,000,000 W

132

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from  

NLE Websites -- All DOE Office Websites (Extended Search)

Sun: The Installed Cost of Photovoltaics in the U.S. from Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007 Title Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007 Publication Type Report Refereed Designation Unknown Year of Publication 2009 Authors Wiser, Ryan H., Galen L. Barbose, and Carla Peterman Pagination 42 Date Published 02/2009 Publisher LBNL City Berkeley Keywords electricity markets and policy group, energy analysis and environmental impacts department, photovoltaics, power system economics, renewable energy Abstract As installations of grid-connected solar photovoltaic (PV) systems have grown, so too has the desire to track the installed cost of these systems over time, by system characteristics, by system location, and by component. This report helps to fill this need by summarizing trends in the installed cost of grid-connected PV systems in the United States from 1998 through 2007. The report is based on an analysis of installed cost data from nearly 37,000 residential and non-residential PV systems, totaling 363 MW of capacity, and representing 76% of all grid-connected PV capacity installed in the U.S. through 2007.

133

Electro-mechanical energy conversion system having a permanent ...  

Electro-mechanical energy conversion system having a permanent magnet machine with stator, resonant transfer link and energy converter controls

134

Environmental safety evaluations for nuclear installations  

SciTech Connect

Environmental safety has been an important consideration in the siting, design, and operation of nuclear installations. As a result there have been very few cases in which the releases of radioactive materials from these installations have posed a dosimetrically significant environmental risk, and almost all of these have been connected with accidents or other unintentional situations. In no situation do the intentional releases from nuclear installations appear to have posed significant environmental risks, and with adequate planning and design a high degree of environmental safety may be assured. Many disciplines are involved in the evaluation of safety for nuclear installations. These include such fundamental ones as physics, chemistry, and biology, and more specialized ones such as meteorology, engineering, ecology, medicine, and electronics. A comprehensive review of environmental surveillance data and estimates of dose commitments from nuclear installations suggests that compared to the doses from background and from fallout, those attributable to the effluents from nuclear facilities have been small and for the most part quite local. it is concluded that, the upper limit of the risk associated with exposure of up to a few millirems per year is indeed small compared to many other commonly accepted risks of living in present day society. (72 refurences) (CH)

Hull, A.P.

1973-01-01T23:59:59.000Z

135

Electric Vehicle Supply Equipment Installed Cost Analysis  

Science Conference Proceedings (OSTI)

More than 140,000 plug-in electric vehicles (PEVs) have been sold since December 2010. Critical to maintaining this upward trend is achievement of a diverse and available charging infrastructure. The purpose of this study is to analyze one key element of the charging infrastructurethe cost of installation. While the fuel cost of electricity to charge a PEV is significantly lower than the cost of gasoline, the cost to hire an electrician to install electric vehicle supply equipment (EVSE) for ...

2013-12-06T23:59:59.000Z

136

Unit Conversion  

Science Conference Proceedings (OSTI)

Unit Conversion. ... Unit Conversion Example. "If you have an amount of unit of A, how much is that in unit B?"; Dimensional Analysis; ...

2012-12-04T23:59:59.000Z

137

Jiangxi Jinli Permanent Magnet Technology Co Ltd | Open Energy Information  

Open Energy Info (EERE)

Jinli Permanent Magnet Technology Co Ltd Jinli Permanent Magnet Technology Co Ltd Jump to: navigation, search Name Jiangxi Jinli Permanent Magnet Technology Co Ltd Place Ganzhou, Jiangxi Province, China Sector Wind energy Product A China-based mining company for rare earth metals used in wind power generators. References Jiangxi Jinli Permanent Magnet Technology Co Ltd[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Jiangxi Jinli Permanent Magnet Technology Co Ltd is a company located in Ganzhou, Jiangxi Province, China . References ↑ "Jiangxi Jinli Permanent Magnet Technology Co Ltd" Retrieved from "http://en.openei.org/w/index.php?title=Jiangxi_Jinli_Permanent_Magnet_Technology_Co_Ltd&oldid=347439

138

Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cove, Columbia, SC  

DOE Green Energy (OSTI)

Information is presented concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water. Included are such items as principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system. Also included are trouble-shooting charts and maintenance schedules.

Not Available

1980-09-01T23:59:59.000Z

139

Alternative Fuels Data Center: Installation of Alternative Fuel Components  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Installation of Installation of Alternative Fuel Components in Vehicles to someone by E-mail Share Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Facebook Tweet about Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Twitter Bookmark Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Google Bookmark Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Delicious Rank Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Digg Find More places to share Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on AddThis.com... More in this section... Federal

140

Changes related to "New England Breeze Solar and Wind Installers...  

Open Energy Info (EERE)

this page on Facebook icon Twitter icon Changes related to "New England Breeze Solar and Wind Installers" New England Breeze Solar and Wind Installers Jump to:...

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Safety Advisory 2007-03: OSHA Revises its Electrical Installation...  

NLE Websites -- All DOE Office Websites (Extended Search)

851. SUMMARY Changes to OSHA's general industry electrical installation standard focus on safety in the design and installation of electric equipment in the workplace. Some of the...

142

Five Million Smart Meters Installed Nationwide is Just the Beginning...  

NLE Websites -- All DOE Office Websites (Extended Search)

Five Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid Progress Five Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid...

143

Property:Installed Capacity (MW) | Open Energy Information  

Open Energy Info (EERE)

Capacity (MW) Jump to: navigation, search Property Name Installed Capacity (MW) Property Type Number Retrieved from "http:en.openei.orgwindex.php?titleProperty:InstalledCapac...

144

Installation-Restoration Program Records search for Des Moines Air National Guard Installation, Iowa  

SciTech Connect

Conclusions are: 1) Information obtained through interviews with 17 past and present installation personnel, installation records, shop folders, and field observations indicate that the Des Monies ANG Installation property has been used for disposal of small quantities of hazardous material in the past. 2) No evidence of environmental stress resulting from past disposal practices was observed at the Des Moines ANG installation. 3) In the priority listing of the three rated sites and their overall scores, the Facility 105 Vehicle Maintenance Fuel Tank, and the existing fire department training area, exhibit the most-significant potential (relative to the other Des Moines ANG Installation sites) for environmental concerns. 4) The old fire department training area located at Facility No. 228, is not considered to present significant concern for adverse effects on health or the environment.

1983-09-01T23:59:59.000Z

145

Effect of Side Permanent Magnets for Reluctance Interior Permanent Magnet Reluctance Machines  

Science Conference Proceedings (OSTI)

A traditional electric machine uses two dimensional magnetic flux paths in its rotor. This paper presents the development work on the utilization of the third dimension of a rotor. As an example, the air gap flux of a radial gap interior permanent magnet motor can be significantly enhanced by additional permanent magnets (PM) mounted at the sides of the rotor. A prototype motor built with this concept provided higher efficiency and required a shorter stator core length for the same power output as the Toyota/Prius traction drive motor.

Hsu, John S [ORNL; Lee, Seong T [ORNL; Wiles, Randy H [ORNL; Coomer, Chester [ORNL; Lowe, Kirk T [ORNL

2007-01-01T23:59:59.000Z

146

Tracking the Sun II The Installed Cost of Photovoltaics in the U.S. from  

NLE Websites -- All DOE Office Websites (Extended Search)

Tracking the Sun II The Installed Cost of Photovoltaics in the U.S. from Tracking the Sun II The Installed Cost of Photovoltaics in the U.S. from 1998-2008 Title Tracking the Sun II The Installed Cost of Photovoltaics in the U.S. from 1998-2008 Publication Type Report Refereed Designation Unknown Year of Publication 2009 Authors Wiser, Ryan H., Galen L. Barbose, Carla Peterman, and Naïm Darghouth Pagination 150 Date Published 10/2009 Publisher LBNL City Berkeley Keywords electricity markets and policy group, energy analysis and environmental impacts department, photovoltaics, power system economics, renewable energy Abstract As the deployment of grid-connected solar photovoltaic (PV) systems has increased, so too has the desire to track the installed cost of these systems over time and by location, customer type, system characteristics, and component. This report helps to fill this need by summarizing trends in the installed cost of grid-connected PV systems in the United States from 1998 through 2008 (updating a previous report with data through 2007). The analysis is based on installed cost data from more than 52,000 residential and non-residential PV systems, totaling 566 MW and representing 71% of all grid-connected PV capacity installed in the U.S. through 2008.

147

Largest Solar Panel Installation at a U.S. University Goes Live |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Largest Solar Panel Installation at a U.S. University Goes Live Largest Solar Panel Installation at a U.S. University Goes Live Largest Solar Panel Installation at a U.S. University Goes Live November 4, 2010 - 6:10pm Addthis Sen. Menendez, Rep. Pascrell, John Lushetsky and other officials at the ribbon cutting. Sen. Menendez, Rep. Pascrell, John Lushetsky and other officials at the ribbon cutting. John Lushetsky A couple of weeks ago, I had the opportunity to participate in a ribbon cutting event for the largest solar installation on a United States university campus. It was an honor to stand with Senator Robert Menendez, Representative Bill Pascrell, university administrators, faculty and students to celebrate William Paterson University's new solar panels. This project will have the capacity to produce 3.5 megawatts of clean

148

Batch fabrication of precision miniature permanent magnets  

DOE Patents (OSTI)

A new class of processes for fabrication of precision miniature rare earth permanent magnets is disclosed. Such magnets typically have sizes in the range 0.1 to 10 millimeters, and dimensional tolerances as small as one micron. Very large magnetic fields can be produced by such magnets, lending to their potential application in MEMS and related electromechanical applications, and in miniature millimeter-wave vacuum tubes. This abstract contains simplifications, and is supplied only for purposes of searching, not to limit or alter the scope or meaning of any claims herein.

Christenson, Todd R. (Albuquerque, NM); Garino, Terry J. (Albuquerque, NM); Venturini, Eugene L. (Albuquerque, NM)

2002-01-01T23:59:59.000Z

149

Permanent-magnet-less synchronous reluctance system  

DOE Patents (OSTI)

A permanent magnet-less synchronous system includes a stator that generates a magnetic revolving field when sourced by an alternating current. An uncluttered rotor is disposed within the magnetic revolving field and spaced apart from the stator to form an air gap relative to an axis of rotation. The rotor includes a plurality of rotor pole stacks having an inner periphery biased by single polarity of a north-pole field and a south-pole field, respectively. The outer periphery of each of the rotor pole stacks are biased by an alternating polarity.

Hsu, John S

2012-09-11T23:59:59.000Z

150

Experimental Evaluation of Installed Cooking Exhaust Fan Performance  

SciTech Connect

The installed performance of cooking exhaust fans was evaluated through residential field experiments conducted on a sample of 15 devices varying in design and other characteristics. The sample included two rear downdraft systems, two under-cabinet microwave over range (MOR) units, three different installations of an under-cabinet model with grease screens across the bottom and no capture hood, two devices with grease screens covering the bottom of a large capture hood (one under-cabinet, one wall-mount chimney), four under-cabinet open hoods, and two open hoods with chimney mounts over islands. Performance assessment included measurement of airflow and sound levels across fan settings and experiments to quantify the contemporaneous capture efficiency for the exhaust generated by natural gas cooking burners.Capture efficiency is defined as the fraction of generated pollutants that are removed through the exhaust and thus not available for inhalation of household occupants. Capture efficiency (CE) was assessed for various configurations of burner use (e.g., single front, single back, combination of one front and one back, oven) and fan speed setting. Measured airflow rates were substantially lower than the levels noted in product literature for many of the units. This shortfall was observed for several units costing in excess of $1000. Capture efficiency varied widely (from<5percent to roughly 100percent) across devices and across conditions for some devices. As expected, higher capture efficiencies were achieved with higher fan settings and the associated higher air flow rates. In most cases, capture efficiencies were substantially higher for rear burners than for front burners. The best and most consistent performance was observed for open hoods that covered all cooktop burners and operated at higher airflow rates. The lowest capture efficiencies were measured when a front burner was used with a rear backdraft system or with lowest fan setting for above the range systems that do not cover the front burners.

Singer, Brett C.; Delp, William W.; Apte, Michael G.

2010-11-01T23:59:59.000Z

151

Experimental Evaluation of Installed Cooking Exhaust Fan Performance  

Science Conference Proceedings (OSTI)

The installed performance of cooking exhaust fans was evaluated through residential field experiments conducted on a sample of 15 devices varying in design and other characteristics. The sample included two rear downdraft systems, two under-cabinet microwave over range (MOR) units, three different installations of an under-cabinet model with grease screens across the bottom and no capture hood, two devices with grease screens covering the bottom of a large capture hood (one under-cabinet, one wall-mount chimney), four under-cabinet open hoods, and two open hoods with chimney mounts over islands. Performance assessment included measurement of airflow and sound levels across fan settings and experiments to quantify the contemporaneous capture efficiency for the exhaust generated by natural gas cooking burners.Capture efficiency is defined as the fraction of generated pollutants that are removed through the exhaust and thus not available for inhalation of household occupants. Capture efficiency (CE) was assessed for various configurations of burner use (e.g., single front, single back, combination of one front and one back, oven) and fan speed setting. Measured airflow rates were substantially lower than the levels noted in product literature for many of the units. This shortfall was observed for several units costing in excess of $1000. Capture efficiency varied widely (fromfan settings and the associated higher air flow rates. In most cases, capture efficiencies were substantially higher for rear burners than for front burners. The best and most consistent performance was observed for open hoods that covered all cooktop burners and operated at higher airflow rates. The lowest capture efficiencies were measured when a front burner was used with a rear backdraft system or with lowest fan setting for above the range systems that do not cover the front burners.

Singer, Brett C.; Delp, William W.; Apte, Michael G.

2010-11-01T23:59:59.000Z

152

Offshore Wind Turbines and Their Installation  

Science Conference Proceedings (OSTI)

Offshore winds tend to be higher, more constant and not disturbed by rough terrain, so there is a large potential for utilizing wind energy near to the sea. Compared with the wind energy converters onland, wind turbine components offshore will subject ... Keywords: renewable energy, wind power generation, offshore wind turbines, offshore installation

Liwei Li; Jianxing Ren

2010-01-01T23:59:59.000Z

153

On software component co-installability  

Science Conference Proceedings (OSTI)

Modern software systems are built by composing components drawn from large repositories, whose size and complexity is increasing at a very fast pace. A fundamental challenge for the maintainability and the scalability of such software systems is the ... Keywords: co-installability, component, conflicts, dependencies, open source, package management

Roberto Di Cosmo; Jrme Vouillon

2011-09-01T23:59:59.000Z

154

Performance of Installed Cooking Exhaust Devices  

NLE Websites -- All DOE Office Websites (Extended Search)

Performance of Installed Cooking Exhaust Devices Performance of Installed Cooking Exhaust Devices Title Performance of Installed Cooking Exhaust Devices Publication Type Journal Article Refereed Designation Refereed LBNL Report Number LBNL-5265E Year of Publication 2012 Authors Singer, Brett C., William W. Delp, Michael G. Apte, and Phillip N. Price Journal Indoor Air Volume 22 Issue 3 Pagination 224-234 Date Published 06/2012 Keywords carbon monoxide, natural gas burners, nitrogen dioxide, range hood, task ventilation, unvented combustion, indoor environment group, Range Hood Test Facility Abstract The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) - including exhaust fan/microwave combination appliances - were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

155

united stadium. united station.  

E-Print Network (OSTI)

??DC United is one of Major League Soccers most decorated franchises, yet it still plays its home games within the crumbling confines of RFK Stadium. (more)

Groff, David R.

2011-01-01T23:59:59.000Z

156

Permanent Peak Load Shift Product Deployment for Smart Grid Integration and Operation  

Science Conference Proceedings (OSTI)

This project tested and evaluated an innovative energy storage technology that provides permanent peak load shifting using electro-thermal energy storage in combination with commercial unitary rooftop air conditioning systems. Four Ice Bear 30 units were deployed at a Staples facility to store an estimated 32 kWh each of energy in 10 off-peak hours and reduce an estimated 5 kW of site energy demand for an on-peak six-hour period. The Ice Bear units are monitored and controlled with a smart grid ...

2012-11-14T23:59:59.000Z

157

Milwaukee Installer Reflects on His Career In Solar  

Energy.gov (U.S. Department of Energy (DOE))

Interested in joining America's solar workforce? One Milwaukee solar installer shares his career reflections and advice.

158

MHK Technologies/OCGen turbine generator unit TGU | Open Energy Information  

Open Energy Info (EERE)

OCGen turbine generator unit TGU OCGen turbine generator unit TGU < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage OCGen turbine generator unit TGU.jpg Technology Profile Primary Organization Ocean Renewable Power Company Project(s) where this technology is utilized *MHK Projects/Cook Inlet Tidal Energy *MHK Projects/East Foreland Tidal Energy *MHK Projects/Lubec Narrows Tidal *MHK Projects/Nenana Rivgen *MHK Projects/Treat Island Tidal *MHK Projects/Western Passage OCGen Technology Resource Click here Current/Tidal Technology Type Click here Cross Flow Turbine Technology Readiness Level Click here TRL 4: Proof of Concept Technology Description he OCGen turbine-generator unit (TGU) is unidirectional regardless of current flow direction. Two cross flow turbines drive a permanent magnet generator on a single shaft. OCGen modules contain the ballast/buoyancy tanks and power electronics/control system allowing for easier installation. The OCGen TGU can be stacked either horizontally or vertically to form arrays.

159

Installation package for Sunpak solar collectors  

DOE Green Energy (OSTI)

Owens-Illinois, Inc., has developed a subsystem (air/liquid vacuum collector) for use with solar combined heating and cooling subsystems. The Model SEC-601 collector is modular in design, is approximately twelve-feet-three-inches wide and is eight-feet-seven-inches high. The module contains 72 collector tube elements and weighs approximately 300 pounds. The Installation, Operating, and Maintenance Instructions, List of Materials and the Assembly Drawing are presented.

Not Available

1978-09-01T23:59:59.000Z

160

Power reduction control for inductive lighting installation  

SciTech Connect

A control system for continuously, selectively reducing power consumption in an inductive lighting installation energized from an A.C. power source, the installation including at least one gas discharge lamp such as a fluorescent lamp energized through any of a plurality of different types of electromagnetic ballast having different harmonic distortion characteristics, the control system is described comprising: load energizing circuit means, including a signal-actuated normally-closed primary switch, for connecting an A.C. power source to the lighting installation; a signal-actuated, normally-open secondary switch connected in parallel with the lighting installation; actuation means for generating actuation signals and applying such actuation signals to the primary and secondary switches to actuate the primary switch open and to actuate the secondary switch closed in approximate time coincidence in each half-cycle of the A.C. power; zero-crossing detector means for generating zero-crossing signals at times TX indicative of zero-voltage transitions in the A.C. power; and program means, connected to the zero-crossing detector means and to the actuation means, programming the actuation means to generate (a) power reduction actuation signals at times T1 and T2 in each half-cycle of the A.C. power, (b) a first filter actuation signal at a time T3 prior to each zero-crossing time TX, and (c) a second filter actuation signal at a time T4 following each zero-crossing time TX; the program means including a plurality of programs each establishing a set of times T1, T2, T3 and T4 for several different power reduction levels for a particular type of ballast; and selection means for selecting a program to match the ballast type of the load.

Falk, K.R.

1993-06-22T23:59:59.000Z

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Extra-Territorial Siting of Nuclear Installations  

Science Conference Proceedings (OSTI)

Arrangements might be created for siting nuclear installations on land ceded by a host State for administration by an international or multinational organization. Such arrangements might prove useful in terms of resolving suspicions of proliferation in troubled areas of the world, or as a means to introduce nuclear activities into areas where political, financial or technical capabilities might otherwise make such activities unsound, or as a means to enable global solutions to be instituted for major nuclear concerns (e.g., spent fuel management). The paper examines practical matters associated with the legal and programmatic aspects of siting nuclear installations, including diplomatic/political frameworks, engaging competent industrial bodies, protection against seizure, regulation to ensure safety and security, waste management, and conditions related to the dissolution of the extra-territorial provisions as may be agreed as the host State(s) achieve the capabilities to own and operate the installations. The paper considers the potential for using such a mechanism across the spectrum of nuclear power activities, from mining to geological repositories for nuclear waste. The paper considers the non-proliferation dimensions associated with such arrangements, and the pros and cons affecting potential host States, technology vendor States, regional neighbors and the international community. It considers in brief potential applications in several locations today.

Shea, Thomas E.; Morris, Frederic A.

2009-10-07T23:59:59.000Z

162

Homeowner's Guide to Window Air Conditioner Installation for Efficiency and Comfort (Fact Sheet), Building America Case Study: Technology Solutions for Existing Homes, Building Technologies Office (BTO)  

SciTech Connect

This fact sheet offers a step-by-step guide to proper installation of window air conditioning units, in order to improve efficiency and comfort for homeowners.

2013-06-01T23:59:59.000Z

163

Control center survey: Installed and planned applications software  

SciTech Connect

This project surveyed the utility industry use of applications. In addition, the survey collected information regarding future plans to add applications, interest in and knowledge about new control center technologies and identification of current problems that might be solved by new software applications. Over three hundred (300) utilities were surveyed consisting of the investor-owned, rural electric generation and transmission cooperatives, municipal power pools and federally chartered utilities. Of these utilities, 10 are Canadian and 7 are power pools. The rest are United States utilities having a peak demand on installed capacity above 200 MW. The survey was conducted by mailing a questionnaire and/or following up with a telephone call. Information was received from 282 utilities, a 94% response. 13 figs., 14 tabs.

Not Available

1990-02-01T23:59:59.000Z

164

Photovoltaic Installation on a Commercial Building (Bishop Museum) -- Design and Installation  

Science Conference Proceedings (OSTI)

This report, the first of two deliverable reports provided to the Electric Power Research Institute (EPRI) under Research and Development (R&D) Agreement No. EP-P7353/C3739 (Building Integrated Photovoltaic Commercial Building Project), provides information on the design and installation of a photovoltaic (PV) system installed at the State Museum of Natural and Cultural History (Bishop Museum) located in Honolulu, Hawaii. Details on structural specifications, PV system design and specifications, and less...

2004-02-13T23:59:59.000Z

165

Electromagnetic Analysis of Rotating Permanent Magnet Exciters for Hydroelectric Generators.  

E-Print Network (OSTI)

??The purpose of this project is to analyse different design possibilities for a rotating permanent magnet exciter for a hydroelectric generator. This is done through (more)

Nland, Jonas

2013-01-01T23:59:59.000Z

166

Alternative Fuels Data Center: Installing New E85 Equipment  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Installing New E85 Installing New E85 Equipment to someone by E-mail Share Alternative Fuels Data Center: Installing New E85 Equipment on Facebook Tweet about Alternative Fuels Data Center: Installing New E85 Equipment on Twitter Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Google Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Delicious Rank Alternative Fuels Data Center: Installing New E85 Equipment on Digg Find More places to share Alternative Fuels Data Center: Installing New E85 Equipment on AddThis.com... More in this section... Ethanol Basics Benefits & Considerations Stations Locations Infrastructure Development Business Case Equipment Options Equipment Installation Codes, Standards, & Safety Vehicles Laws & Incentives

167

Thermal Performance Impacts of Center-of-Glass Deflections in Installed  

NLE Websites -- All DOE Office Websites (Extended Search)

Thermal Performance Impacts of Center-of-Glass Deflections in Installed Thermal Performance Impacts of Center-of-Glass Deflections in Installed Insulating Glazing Units Title Thermal Performance Impacts of Center-of-Glass Deflections in Installed Insulating Glazing Units Publication Type Journal Article LBNL Report Number LBNL-5800E Year of Publication 2012 Authors Hart, Robert, Howdy Goudey, Dariush K. Arasteh, and Dragan C. Curcija Journal Energy and Buildings Volume 54 Issue November 2012 Pagination 453-460 Date Published 11/2012 Keywords concave, convex, deflection, field test, gap, insulating glass unit, thermal performance, thermal transmittance, u-factor Abstract This study examines the thermal performance impact of center-of-glass (COG) deflections in double- and triple-pane insulating glass units (IGUs) installed at several locations throughout the US. Deflection was measured during summer and winter temperatures; the results show that outdoor temperature variations can be represented a linear change in COG gap width in double- and triple-pane IGUs within the temperature ranges measured. However, the summer-winter temperature-induced deflection is similar in magnitude to the observed spread in COG deflection of similar units at the same temperature, which suggests that factors other than temperature are of equal importance in determining the in-situ deflection of windows. The effect of deflection on thermal performance depends on the IGU's designed gap. Units constructed with smaller-than-optimal gaps often exhibit significant U-factor change due to temperature-induced reduction in gap width. This effect is particularly problematic in high-performance triple glazing where small gap dimension changes can have a large impact on performance.

168

Jim Walter Resources installs new overland conveyor  

Science Conference Proceedings (OSTI)

Embarking on a major expansion plan, the company is constructing a new additional overland conveyor coal to a recently refurbished prep plant. Jim Walter Resources recently invested $20 million in a new 5-mile overland conveyor system to haul coal from the No.7 deep coal mine in Alabama to the No.5 coal preparation plant. The size of the No.7 mine was effectively doubled. The article describes how this expansion move was decided upon and describes the design and installation of the new conveyor which spans approximately 5 miles. 4 photos.

Fiscor, S.

2008-12-15T23:59:59.000Z

169

Installation package for concentrating solar collector panels  

DOE Green Energy (OSTI)

Northrup, Inc., has developed and delivered 300 square feet of Concentrating Solar Collector (ML Series) and Attitude Control System, under the direction of the National Aeronautics and Space Administration. The ''ML Series'' Solar Collector Panels comprise a complete package array consisting of collector panels using modified Fresnel Prismatic Lenses for a 10 to 1 concentrating ration, supporting framework, fluid manifolding and tracking drive system, in unassembled components for field erection. The Installation, Operation and Maintenance Manual, Warranty, List of Materials, Sub-Assembly drawings and Final Field Assembly Drawings are included in the package.

Not Available

1978-08-01T23:59:59.000Z

170

Permanent magnet energy conversion machine with magnet mounting arrangement  

DOE Patents (OSTI)

A hybrid permanent magnet dc motor includes three sets of permanent magnets supported by the rotor and three sets of corresponding stators fastened to the surrounding frame. One set of magnets operates across a radial gap with a surrounding radial gap stator, and the other two sets of magnets operate off the respective ends of the rotor across respective axial gaps.

Hsu, John S. (Oak Ridge, TN); Adams, Donald J. (Knoxville, TN)

1999-01-01T23:59:59.000Z

171

FOR NUCLEAR POWER PLANTS DURING DECOMMISSIONING AND PERMANENT SHUTDOWN  

E-Print Network (OSTI)

This guide has been developed to describe methods acceptable to the NRC staff for complying with the NRCs regulations regarding fire protection programs for licensees who have certified that their plants have permanently ceased operations and that the fuel has been permanently removed from the reactor vessels.

A. Introduction

2001-01-01T23:59:59.000Z

172

SUPER HIGH-SPEED MINIATURIZED PERMANENT MAGNET SYNCHRONOUS MOTOR  

E-Print Network (OSTI)

SUPER HIGH-SPEED MINIATURIZED PERMANENT MAGNET SYNCHRONOUS MOTOR by LIPING ZHENG B.S. Shanghai with the design of permanent magnet synchronous motors (PMSM) to operate at super-high speed with high efficiency the motor to have an efficiency reaching above 92%. This achieved efficiency indicated a significant

Wu, Shin-Tson

173

Ironless Permanent Magnet Motors: Three-Dimensional Analytical Calculation  

E-Print Network (OSTI)

1 Ironless Permanent Magnet Motors: Three-Dimensional Analytical Calculation Romain Ravaud, Guy and the rotor of an ironless permanent magnet motor. The calculations are carried out without using any, torque, magnetic field, PM Synchronous motors ! 1 INTRODUCTION IRONLESS electrical machines are generally

Paris-Sud XI, Université de

174

IDENTIFYING ABBERANT SEGMENTS IN PERMANENT DOWNHOLE GAUGE DATA  

E-Print Network (OSTI)

for interpretation of subsurface conditions in a well. The data from permanent downhole gauges are voluminous the world supplying continuous real time data about subsurface reservoir conditions. Permanent downhole gauges are used in reservoir monitoring and management by interpreting the pressure, flow rate

175

Joint heating and cooling with the aid of a solar installation using a glazed regenerator-heater for the solution  

SciTech Connect

A solar unit for the joint production of heating and refrigeration has been designed on the basis of glazed solution regeneration. The unit is similar to installations employing glazed solution regenerators for cooling alone. Equations are presented for calculating specific refrigeration and heating capacities as a function of such factors as meteorological conditions. The calculations show that the unit has good heating and refrigeration capacity and that optimum performance is obtained when water must be heated to 45 to 55 C.

Khandurdev, A.; Kakabaev, A.; Kurbankuliev, Ch.

1980-01-01T23:59:59.000Z

176

Performance of Installed Cooking Exhaust Devices  

Science Conference Proceedings (OSTI)

The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) including exhaust fan/microwave combination appliances were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

Singer, Brett C.; Delp, William W.; Apte, Michael G.; Price, Philip N.

2011-11-01T23:59:59.000Z

177

Collimateur integration and installation Example of one object to be installed in the LHC  

E-Print Network (OSTI)

The collimation system is a vital part of the LHC project, protecting the accelerator against unavoidable regular and irregular beam loss. About 80 collimators will be installed in the machine before the first run. Two insertion regions are dedicated to collimation and these regions will be among the most radioactive in the LHC. The space available in the collimation regions is very restricted, it was therefore important to ensure that the 3-D integration of these areas of the LHC tunnel would allow straightforward installation of collimators and also exchange of collimators under the remote handling constraints imposed by high radiation levels. The paper describes the 3-D integration studies and verifications of the collimation regions combining the restricted space available, the dimensions of the different types of collimators and the space needed for transport and handling. The paper explains how installation has been planned and carried out taking into account the handling.

Aberle, O; Chamizo, R; Weiler, T; Chemli, S; Corso, J P; Coupard, J; Delsaux, F; Foraz, K; Jimnez, J M; Kadi, Y; Kershaw, K; Lazzaroni, M; Perret, R; Bertone, C; Grenard, J L

2008-01-01T23:59:59.000Z

178

The search for permanent electric dipole moments  

SciTech Connect

Permanent electric dipole moments (EDMs) of fundamental systems with spin - particles, nuclei, atoms or molecules violate parity and time reversal invariance. Invoking the CPT theorem, time reversal violation implies CP violation. Although CP-violation is implemented in the standard electro-weak theory, EDM generated this way remain undetectably small. However, this CP-violation also appears to fail explaining the observed baryon asymmetry of our universe. Extensions of the standard theory usually include new sources of CP violation and often predict sizeable EDMs. EDM searches in different systems are complementary and various efforts worldwide are underway and no finite value has been established yet. The prototype of an EDM search is the pursuit of the EDM of the neutron. It has the longest history and at the same time is at the forefront of present research. The talk aims at giving an overview of the field with emphasis on our efforts within an international collaboration at PSI, nedm.web.psi.ch.

Kirch, Klaus [PSI-Villigen - ETH Zrich

2013-02-13T23:59:59.000Z

179

Heading off the permanent oil crisis  

SciTech Connect

The 1996 spike in gasoline prices was not a signal of any fundamental worldwide shortage of crude oil. But based on a review of many studies of recoverable crude oil that have been published since the 1950s, it looks as though such a shortfall is now within sight. With world demand for oil growing at 2 percent per year, global production is likely to peak between the years 2007 and 2014. As this time approaches, we can expect prices to rise markedly and, most likely, permanently. Policy changes are needed now to ease the transition to high-priced oil. Oil production will continue, though at a declining rate, for many decades after its peak, and there are enormous amounts of coal, oil sands, heavy oil, and oil shales worldwide that could be used to produce liquid or gaseous substitutes for crude oil, albeit at higher prices. But the facilities for making such synthetic fuels are costly to build and environmentally damaging to operate, and their use would substantially increase carbon dioxide emissions (compared to emissions from products made from conventional crude oil). This paper examines ways of heading of the impending oil crisis. 8 refs., 3 figs.

MacKenzie, J.J. [World Resources Inst., Washington, DC (United States)

1996-11-01T23:59:59.000Z

180

Tracking the Sun III The Installed Cost of Photovoltaics  

E-Print Network (OSTI)

Contents The Installed Cost of Photovoltaics in the U.S. from 1998-2009 Environmental Energy Technologies .................................................................... 10 4. PV Incentive and Net Installed Cost Trends ....................................... 27 5 Appendix A: Data Cleaning, Coding, and Standardization ....................... 36 Appendix B: Detailed

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Issue #3: HVAC Proper Installation Energy Savings: Over-Promising...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: HVAC Proper Installation Energy Savings: Over-Promising or Under-Delivering? Issue 3: HVAC Proper Installation Energy Savings: Over-Promising or Under-Delivering? What energy...

182

Design and installation package for a solar powered pump  

DOE Green Energy (OSTI)

Information is presented to evaluate the design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company. Included is information about subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings.

Not Available

1978-07-01T23:59:59.000Z

183

Energy Department Launches SunShot Prize Competition to Install...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price Energy Department Launches SunShot Prize Competition to Install Solar Energy Systems at a...

184

Energy Saving 'Cool Roofs' Installed at Y-12 | National Nuclear...  

National Nuclear Security Administration (NNSA)

Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Energy Saving 'Cool Roofs' Installed at Y-12 Energy Saving 'Cool Roofs' Installed at Y-12...

185

Observations from the field: Solar domestic hot water installation recommendations  

SciTech Connect

The Florida Solar Energy Center (FSEC) was ten years old in 1984. Constant contact has been maintained between the Center and solar businesses selling and installing domestic hot water systems in Florida and throughout the Southern states of the Caribbean. FSEC has thus had the opportunity to visit or discuss thousands of DHW system installations with homeowners and installers. This paper provides an overview of lessons learned and some of the resulting installation recommendations for direct, open-loop domestic hot water systems.

Cromer, C.J.

1985-01-01T23:59:59.000Z

186

NREL Job Task Analysis: Retrofit Installer Technician (Revised)  

SciTech Connect

A summary of job task analyses for the position of retrofit installer technician when conducting weatherization work on a residence.

Kurnik, C.; Woodley, C.

2012-04-01T23:59:59.000Z

187

UDS Recovery Equipment Installation (AFCI CETE Milestone Report)  

SciTech Connect

This letter documents the successful installation of the un-dissolved solids (UDS) recovery equipment into the hot-cell in building 7920 at ORNL. This installation (see Figure 1) satisfies the AFCI Level 4 milestone in the CETE Investments and Hot Cell Upgrades work package (OR0915020323) to 'Complete UDS recovery equipment installation' (M4502032306), due 30 June 09.

Jubin, Robert Thomas [ORNL

2009-06-01T23:59:59.000Z

188

Nuclear Plant Analyzer: Installation manual. Volume 1  

SciTech Connect

This report contains the installation instructions for the Nuclear Plant Analyzer (NPA) System. The NPA System consists of the Computer Visual System (CVS) program, the NPA libraries, the associated utility programs. The NPA was developed at the Idaho National Engineering Laboratory under the sponsorship of the US Nuclear Regulatory Commission to provide a highly flexible graphical user interface for displaying the results of these analysis codes. The NPA also provides the user with a convenient means of interactively controlling the host program through user-defined pop-up menus. The NPA was designed to serve primarily as an analysis tool. After a brief introduction to the Computer Visual System and the NPA, an analyst can quickly create a simple picture or set of pictures to aide in the study of a particular phenomenon. These pictures can range from simple collections of square boxes and straight lines to complex representations of emergency response information displays.

Snider, D.M.; Wagner, K.L.; Grush, W.H.; Jones, K.R. [Idaho National Engineering Lab., Idaho Falls, ID (United States)]|[Lockheed Idaho Technologies Co., Idaho Falls, ID (United States)

1995-01-01T23:59:59.000Z

189

Using remote installation services for windows to streamline installations in the UTPB computer science research lab  

Science Conference Proceedings (OSTI)

The Computer Science Research Lab at The University of Texas of the Permian Basin (UTPB) is operated by three part-time student assistants with minimal faculty supervision. This lab supports seven Windows and Sun Solaris servers and approximately thirty ... Keywords: RIS, remote installation, windows

Cherry Owen; Dustin Piper

2006-11-01T23:59:59.000Z

190

Installing R and R-Commander This appendix gives detailed instructions for installing R and R-Commander.  

E-Print Network (OSTI)

"Subdirectories", and install "tcltk.dmg" (universal build of Tcl/Tk for X11). This file includes additional tools

Utts, Jessica

191

System installation package for the new Hampshire Vocational Technical College, Manchester, N. H  

DOE Green Energy (OSTI)

Contemporary Systems, Incorporated of Jaffrey, New Hampshire, under NASA/MSFC Contract NAS8-32243 has taken its Series V Solar Heating System and developed it to a degree acceptable by local codes and regulatory agencies. The system is composed of the Series V warm air collector, the LCU-110 logic control unit and the USU-A universal switching and transport unit. The collector was originally conceived and designed as an integrated roof/wall system and provides a dual function in the structure. This document describes the above system which has been installed in the residential solar laboratory located at the New Hampshire Vocational Technical College in Manchester, N.H. In addition, it provides general guidelines which may be utilized in development of detailed installation plans and specifications, as well as instructions on operation and maintenance.

Not Available

1979-05-01T23:59:59.000Z

192

Analytical Method of Torque Calculation for Interior Permanent Magnet Synchronous Machines  

E-Print Network (OSTI)

method for performing the output torque calculations of an interior permanent magnet synchronous motor circuit, inductance, permanent magnet machine, synchronous motors, torque. I. NOMENCLATURE BFE brushless field excitation IPMSM interior permanent magnet synchronous motor FEA finite element analysis mmf

Tolbert, Leon M.

193

Alstom 3-MW Wind Turbine Installed at NWTC (Fact Sheet)  

DOE Green Energy (OSTI)

The 3-MW Alstom wind turbine was installed at NREL's NWTC in October 2010. Test data will be used to validate advanced turbine design and analysis tools. NREL signed a Cooperative Research and Development Agreement with Alstom in 2010 to conduct certification testing on the company's 3-MW ECO 100 wind turbine and to validate models of Alstom's unique drivetrain concept. The turbine was installed at NREL's National Wind Technology Center (NWTC) in October 2010 and engineers began certification testing in 2011. Tests to be conducted by NREL include a power quality test to finalize the International Electrotechnical Commission (IEC) requirements for type certification of the 60-Hz unit. The successful outcome of this test will enable Alstom to begin commercial production of ECO 100 in the United States. NREL also will obtain additional measurements of power performance, acoustic noise, and system frequency to complement the 50 Hz results previously completed in Europe. After NREL completes the certification testing on the ECO 100, it will conduct long-term testing to validate gearbox performance to gain a better understanding of the machine's unique ALSTOM PURE TORQUE{trademark} drivetrain concept. In conventional wind turbines, the rotor is supported by the shaft-bearing gearbox assembly. Rotor loads are partially transmitted to the gearbox and may reduce gearbox reliability. In the ALSTOM PURE TORQUE concept, the rotor is supported by a cast frame running through the hub, which transfers bending loads directly to the tower. Torque is transmitted to the shaft through an elastic coupling at the front of the hub. According to Alstom, this system will increase wind turbine reliability and reduce operation and maintenance costs by isolating the gearbox from rotor loads. Gearbox reliability has challenged the wind energy industry for more than two decades. Gearbox failures require expensive and time-consuming replacement, significantly increasing the cost of wind plant operation while reducing the plant's power output and revenue. To solve gearbox reliability issues, NREL launched a Gearbox Reliability Collaborative (GRC) in 2006 and brought together the world's leading turbine manufacturers, consultants, and experts from more than 30 companies and organizations. GRC's goal was to validate the typical design process-from wind turbine system loads to bearing ratings-through a comprehensive dynamometer and field-test program. Design analyses will form a basis for improving reliability of future designs and retrofit packages. Through its study of Alstom's Eco 100 gearbox, NREL can compare its GRC model gearbox with Alstom's and add the results to the GRC database, which is helping to advance more reliable wind turbine technology.

Not Available

2011-09-01T23:59:59.000Z

194

Legend Units  

Science Conference Proceedings (OSTI)

... Syntax: LEGEND UNIT units> where is an integer number or parameter in the range 1 to 100 that specifies the legend identifier; and ...

2013-11-27T23:59:59.000Z

195

Method and apparatus for assembling permanent magnet rotors  

DOE Patents (OSTI)

A permanent magnet assembly for assembly in large permanent magnet motors and generators includes a two-piece carrier that can be slid into a slot in the rotor and then secured in place using a set screw. The invention also provides an auxiliary carrier device with guide rails that line up with the teeth of the rotor, so that a permanent magnet assembly can be pushed first into a slot, and then down the slot to its proper location. An auxiliary tool is provided to move the permanent magnet assembly into position in the slot before it is secured in place. Methods of assembling and disassembling the magnet assemblies in the rotor are also disclosed. 2 figs.

Hsu, J.S.; Adams, D.J.

1999-06-22T23:59:59.000Z

196

Current Status of Permanent Magnet Research and Market in China  

Science Conference Proceedings (OSTI)

In 2008, China supplied 77.6% of Nd-Fe-B, 55.2% of ferrite and 55.3% of AlNiCo for global permanent magnets market. Financial crisis since 2008 has spurred...

197

Time evolution of fields in strontium ferrite permanent magnets  

SciTech Connect

Field strengths for strontium ferrite permanent magnets built for the Fermilab Recycler and 8 GeV transfer line have been measured for the past 4 years. The ferrite magnetization exhibits a time dependence parameterized by M1/M{sub 2} = -9 x 10{sup -4} x log (t{sub 1}/t{sub 2}) as determined from measurements of a gradient magnet. This parameterization has been checked against several other styles of permanent dipoles, and quadrupole magnets with good agreement.

James T. Volk et al.

2001-06-11T23:59:59.000Z

198

Permanent magnet quadrupoles for the CLIC Drive Beam decelerator  

E-Print Network (OSTI)

STFC in collaboration with CERN has developed a new type of adjustable permanent magnet based quadrupole for the CLIC Drive Beam Decelerator. It uses vertical movement of the permanent magnets to achieve an integrated gradient range of 3.6-14.6T, which will allow it to be used for the first 60% of the decelerator line. Construction of a prototype of this magnet has begun; following this, it will be measured magnetically at CERN and Daresbury Laboratory.

Shepherd, Ben; Collomb, Norbert

2012-01-01T23:59:59.000Z

199

Expert Meeting Report: Achieving the Best Installed Performance from High-Efficiency Residential Gas Furnaces  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Achieving the Best Installed Performance from High- Efficiency Residential Gas Furnaces Larry Brand Partnership for Advanced Residential Retrofit (PARR) March 2012 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, subcontractors, or affiliated partners makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade

200

Closure Plan for Corrective Action Unit 110: Area 3 RWMS U-3ax/bl Disposal Unit, Nevada Test Site, Nevada  

SciTech Connect

This Closure Plan has been prepared for the Area 3 RWMS U-3ax/bl Disposal Unit Corrective Action Unit 110 in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). The U-3ax/bl is a historic disposal unit within the Area 3 Radioactive Waste Management Site located on the Nevada Test Site (NTS). The unit, which was formed by excavating the area between two subsidence craters (U-3ax and U-3bl), was operationally closed in 1987. The U-3ax/bl disposal unit is scheduled for permanent closure under the Resource Conservation and Recovery Act as a hazardous waste landfill. Existing records indicate that, from July 1968 to December 1987, U-3ax/bl received 2.3 x 10{sup 5} cubic meters (8.12 x 10{sup 6} cubic feet) of waste. NTS nuclear device testing generated approximately 95 percent of the total volume disposed of in U-3ax/bl, the majority of which came from the Waste Consolidation Project (80 percent of the total volume) (Elletson and Johnejack, 1995). Area 3 is located in Yucca Flat, within the northeast quadrant of the NTS. The Yucca Flat watershed is a structurally closed basin encompassing an area of approximately 780 square kilometers (300 square miles). The structural geomorphology of Yucca Flat is typical of the Basin and Range Physiographic Province. Yucca Flat lies in one of the most arid regions of the country. Water balance calculations for Area 3 indicate that it is continuously in a state of moisture deficit. The U-3ax/bl Disposal Unit will be closed in place by installing a Resource Conservation and Recovery Act equivalent cover. Following cover construction a fence will be installed around the cover to prevent accidental damage to the cover. Post-closure monitoring will consist of site inspections to determine the condition of the engineered cover and cover performance monitoring using Time-Domain Reflectometry arrays to monitor moisture migration in the cover. Any identified maintenance and repair requirements will be remedied within 60 working days of discovery and documented in writing at the time of repair. Results of all inspections/repairs for a given year will be addressed in a single report submitted annually to the NDEP. Soil moisture will be monitored within the cover for a period of at least two years prior to establishing performance criteria for NDEP regulatory purposes.

T. M. Fitzmaurice

2000-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

vu & . vu & . ,I / v a L U ; .8 " ',X v &..'*. "o uu V"x Ijo tf J ,*- , , i 4 w i tiJ U U 1 OEF S.a 135 (0B93) United States Government - Department of Energy memorandum DATE: February 27, 2007 REPLY TO Audit Repor Number: OAS-L-07-08 ATTN OF: IG-32 (A06ID015) SUBJECT: Audit of the "Design of the Engineered Barrier System at the Yucca Mountain Site" TO: Principal Deputy Director, Office of Civilian Radioactive Waste Management INTRODUCTION AND OBJECTrVE In accordance with the Nuclear Waste Policy Act of 1982, the Department of Energy's (Department) Office of Civilian Radioactive Waste Management (OCRWM) is responsible for designing, licensing, constructing, and operating a repository, known as Yucca Mountain, for the permanent disposal of spent nuclear fuel and high-level -

202

Megnetic Field Based Phasor Measurement Unit (PMU)  

Science Conference Proceedings (OSTI)

Synchronous phasor measurements are critical for the wide area monitoring and control of a large interconnected power system. However, only a small number of Phasor Measurement Units (PMUs) have been installed in the North America, mostly because of the large installation and maintenance costs of a classical PMU that uses current transformers (CT) to obtain current signal and potential transformers (PT) to obtain voltage input signals. The classical PMUs use technology developed more than 20 years ago. I...

2009-03-31T23:59:59.000Z

203

Spain Installed Wind Capacity Website | Open Energy Information  

Open Energy Info (EERE)

Spain Installed Wind Capacity Website Spain Installed Wind Capacity Website Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Spain Installed Wind Capacity Website Focus Area: Renewable Energy Topics: Market Analysis Website: www.gwec.net/index.php?id=131 Equivalent URI: cleanenergysolutions.org/content/spain-installed-wind-capacity-website Language: English Policies: Regulations Regulations: Feed-in Tariffs This website presents an overview of total installed wind energy capacity in Spain per year from 2000 to 2010. The page also presents the main market developments from 2010; a policy summary; a discussion of the revision in feed-in tariffs in 2010; and a future market outlook. References Retrieved from "http://en.openei.org/w/index.php?title=Spain_Installed_Wind_Capacity_Website&oldid=514562"

204

Property:Incentive/InstallReqs | Open Energy Information  

Open Energy Info (EERE)

InstallReqs InstallReqs Jump to: navigation, search Property Name Incentive/InstallReqs Property Type Text Description Installation Requirements. Pages using the property "Incentive/InstallReqs" Showing 25 pages using this property. (previous 25) (next 25) A AEP Appalachian Power - Commercial and Industrial Rebate Programs (West Virginia) + Self-installed measures with a rebate level greater than $1,000 and all applications over $20,000, and 5% of remaining applicants will be inspected. Funds can be reserved for a period of 180 days as long as the application includes an expected date of project completion. Customer must have an active account in WV with either Wheeling Power Company, American Electric Power or Appalachian Power Company.

205

Installing and Maintaining a Home Solar Electric System | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System July 2, 2012 - 8:21pm Addthis When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. How does it work? Making sure your home solar electric or PV system is sized, sited, and installed correctly is essential for maximizing its energy performance. As with any mechanical or electrical appliance, PV systems require routine, periodic maintenance.

206

Installing and Maintaining a Small Wind Electric System | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing and Maintaining a Small Wind Electric System Installing and Maintaining a Small Wind Electric System Installing and Maintaining a Small Wind Electric System July 2, 2012 - 8:22pm Addthis Installing and Maintaining a Small Wind Electric System What does this mean for me? When installing a wind system, the location of the system, the energy budget for the site, the size of the system, and the height of the tower are important elements to consider. Deciding whether to connect the system to the electric grid or not is also an important decision. If you went through the planning steps to evaluate whether a small wind electric system will work at your location, you will already have a general idea about: The amount of wind at your site The zoning requirements and covenants in your area The economics, payback, and incentives of installing a wind system

207

Solar Industry At Work: Streamlining Home Solar Installation | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Industry At Work: Streamlining Home Solar Installation Solar Industry At Work: Streamlining Home Solar Installation Solar Industry At Work: Streamlining Home Solar Installation June 12, 2012 - 11:59am Addthis Sunrun is a home solar installation company based in San Francisco. | Photo by Francis Fine Art Photography. Sunrun is a home solar installation company based in San Francisco. | Photo by Francis Fine Art Photography. Erin R. Pierce Erin R. Pierce Digital Communications Specialist, Office of Public Affairs What are the key facts? Tillie Peterson works at Sunrun a home solar installation company based in San Francisco. As Director of Operations, Tillie works to get solar panels up and running for homeowners as simply and quickly as possible. Our Solar Industry At Work Series shares the personal success of

208

Installing and Maintaining a Home Solar Electric System | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System July 2, 2012 - 8:21pm Addthis When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. How does it work? Making sure your home solar electric or PV system is sized, sited, and installed correctly is essential for maximizing its energy performance. As with any mechanical or electrical appliance, PV systems require routine, periodic maintenance.

209

Operational test report for WESF diesel generator diesel tank installation  

Science Conference Proceedings (OSTI)

The WESF Backup Generator Underground Diesel Tank 101 has been replaced with a new above ground 1000 gallon diesel tank. Following the tank installation, inspections and tests specified in the Operational Test Procedure, WHC-SD-WM-OTP-155, were performed. Inspections performed by a Quality Control person indicated the installation was leak free and the diesel generator/engine ran as desired. There were no test and inspection exceptions, therefore, the diesel tank installation is operable.

Schwehr, B.A.

1994-08-02T23:59:59.000Z

210

Underground Transmission Cable System Construction and Installation Practices Manual  

Science Conference Proceedings (OSTI)

A reliable underground transmission line depends on reliable cable system manufacturing, design, construction, installation, and operation and maintenance. Construction and installation remain the most expensive component to implement. Recent advances in underground transmission have led to more demand for best practices and innovative ways to reduce construction and installation costs in a cable project. The Electric Power Research Institute (EPRI) has funded many projects over the years to improve the ...

2010-12-03T23:59:59.000Z

211

Underground Transmission Cable System Installation and Construction Practices Manual  

Science Conference Proceedings (OSTI)

Installation and construction remain the most expensive implementation components of underground transmission cable systems. Recent advancements in underground transmission have led to more demand for best practices and innovative ways to reduce installation and construction costs in a cable project. EPRI has funded many projects over the years to improve the efficiency and reduce the cost of underground transmission cable installation. Other organizations such as Association of Edison Illuminating Compa...

2009-12-22T23:59:59.000Z

212

NETL: Permanence and Safety of CCS FAQs  

NLE Websites -- All DOE Office Websites (Extended Search)

What regulations are in place to govern CO2 injection(s)? What regulations are in place to govern CO2 injection(s)? In December 2010, EPA finalized minimum Federal requirements under the Safe Drinking Water Act (SDWA) for underground CO2 injection for the purpose of geologic storage. This final rule applies to owners or operators of wells that will be used to inject CO2 into the subsurface for the purpose of long-term storage. It establishes a new class of well, Class VI, and sets minimum technical criteria for the permitting, geologic site characterization, corrective action (if necessary), financial responsibility, well construction, operation, monitoring, well plugging, post-injection site care (PISC), and site closure of Class VI wells for the purposes of protecting underground sources of drinking water (USDWs). The elements of this rulemaking are based on the existing Underground Injection Control (UIC) regulatory framework, with modifications to address the unique nature of CO2 injection for geologic storage. This rule will help to ensure consistency in permitting underground CO2 injection at geologic storage operations across the United States and provide requirements to prevent endangerment of USDWs. In addition to these Federal requirements, many states have either enacted CCS requirements or are in the process of doing so. For example, Wyoming passed legislation in 2009 covering the general legislative framework, pore space ownership (including rights, limitations, and protections) and unitization. Liability legislation covering "post closure" and "long-term stewardship" are also covered. The Interstate Oil and Gas Compact Commission (IOGCC) has compiled all of these regulations and provides updates on their current status.

213

Installing and Operating an Efficient Swimming Pool Pump | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

Water with an Efficient Swimming Pool Installing and Operating an Efficient Swimming Pool Pump Swimming Pool Covers An example of a solar pool heater. Solar Swimming Pool Heaters...

214

Installer Issues: Integrating Distributed Wind into Local Communities (Presentation)  

DOE Green Energy (OSTI)

A presentation for the WindPower 2006 Conference in Pittsburgh, PA, regarding the issues facing installer of small wind electric systems.

Green, J.

2006-06-01T23:59:59.000Z

215

Rhode Island Stormwater Design and Installation Standards Manual (Rhode  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rhode Island Stormwater Design and Installation Standards Manual Rhode Island Stormwater Design and Installation Standards Manual (Rhode Island) Rhode Island Stormwater Design and Installation Standards Manual (Rhode Island) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Rhode Island Program Type Environmental Regulations

216

Sensor Net: Nuclear Installation Intrusion Detection in/near Water ...  

Sensor Net: Nuclear Installation Intrusion Detection in/near Water ... Computational Sciences & Engineering Div Licensing Contact SIMS, DAVID L UT-Battelle, LLC

217

VisVIP: Installation Instructions for UNIX Source  

Science Conference Proceedings (OSTI)

... launches a Tcl/Tk process for the control menu. Thus you need a Tcl/Tk implementation installed on your system. exchanges ...

218

Electricity production and cooling energy savings from installation...  

NLE Websites -- All DOE Office Websites (Extended Search)

production and cooling energy savings from installation of a building-integrated photovoltaic roof on an office building Title Electricity production and cooling energy savings...

219

Livermore installs big data machine | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

installs big data machine | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response...

220

Shape the light, light the shape - lighting installation in performance.  

E-Print Network (OSTI)

??This thesis investigates the lighting design theory Light Inside Out, which is the technique of shaping light toward a creation of lighting installation in performance (more)

Yu, Lih-Hwa, 1972-

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Net Zero Energy Military Installations: A Guide to Assessment...  

NLE Websites -- All DOE Office Websites (Extended Search)

Net Zero Energy Military Installations: A Guide to Assessment and Planning Samuel Booth, John Barnett, Kari Burman, Josh Hambrick and Robert Westby Technical Report NREL...

222

Energy Saving 'Cool Roofs' Installed at Y-12 | National Nuclear...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Saving 'Cool Roofs' Installed at Y-12 | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

223

Electric Vehicle Grid Integration for Sustainable Military Installations (Presentation)  

DOE Green Energy (OSTI)

This presentation discusses electric vehicle grid integration for sustainable military installations. Fort Carson Military Reservation in Colorado Springs is used as a case study.

Simpson, M.

2011-05-05T23:59:59.000Z

224

Planning a Commercial Fuel Cell Installation  

E-Print Network (OSTI)

Fuel cell power plants represent a unique opportunity for industrial users to combine on-site electricity generation and heat recovery with high efficiencies and no significant environmental releases. Thus in some circumstances, the fuel cell may be the best option for industrial cogeneration in locations with environmental restrictions. Because of the modular nature of fuel cell plants, unit ratings can be easily tailored for specific user needs. Bechtel is currently working with International Fuel Cells on plant design and marketing for the 11 MW PC23 Fuel Cell Power Plant program, now being offered for electric utility applications. The utility industry offers a nearly uniform market large enough to permit recovery of design, commercial development and manufacturing start-up costs for a standardized plant. This paper discusses the features of these plants that will contribute to the high availability needed for industrial applications. The added advantages of powering the fuel cell with the hydrogen-rich feedstocks often available in refinery and chemical plants and operating in a cogeneration mode are presented as further incentives for anticipating development of commercial, units for industrial applications.

Bowden, J. R.; May, G. W.

1986-06-01T23:59:59.000Z

225

Experience with the procurement of ferrite and temperature compensator for permanent magnets for accelerators  

E-Print Network (OSTI)

Experience with the procurement of ferrite and temperature compensator for permanent magnets for accelerators

Fowler, W B; Volk, J T

1998-01-01T23:59:59.000Z

226

English Units  

Science Conference Proceedings (OSTI)

English Units. A, B, C, D, E, F, G, H, I, J. 1, Steam Point Calculator: English Units, ... 6, Height of steam point apparatus above ground (ft.), 0, ft. ...

2011-12-22T23:59:59.000Z

227

Unit Conversions  

Science Conference Proceedings (OSTI)

... volume flow units, which contain "atm", assume that the gas is: ideal; at a pressure of 101325 Pa; at a temperature of 0 C. Be aware that the unit "atm ...

2012-10-02T23:59:59.000Z

228

Permanent-magnet-less machine having an enclosed air gap  

DOE Patents (OSTI)

A permanent magnet-less, brushless synchronous system includes a stator that generates a magnetic rotating field when sourced by an alternating current. An uncluttered rotor disposed within the magnetic rotating field is spaced apart from the stator to form an air gap relative to an axis of rotation. A stationary excitation core spaced apart from the uncluttered rotor by an axial air gap and a radial air gap substantially encloses the stationary excitation core. Some permanent magnet-less, brushless synchronous systems include stator core gaps to reduce axial flux flow. Some permanent magnet-less, brushless synchronous systems include an uncluttered rotor coupled to outer laminations. The quadrature-axis inductance may be increased in some synchronous systems. Some synchronous systems convert energy such as mechanical energy into electrical energy (e.g., a generator); other synchronous systems may convert any form of energy into mechanical energy (e.g., a motor).

Hsu, John S. (Oak Ridge, TN)

2012-02-07T23:59:59.000Z

229

Permanent-magnet-less machine having an enclosed air gap  

SciTech Connect

A permanent magnet-less, brushless synchronous system includes a stator that generates a magnetic rotating field when sourced by an alternating current. An uncluttered rotor disposed within the magnetic rotating field is spaced apart from the stator to form an air gap relative to an axis of rotation. A stationary excitation core spaced apart from the uncluttered rotor by an axial air gap and a radial air gap substantially encloses the stationary excitation core. Some permanent magnet-less, brushless synchronous systems include stator core gaps to reduce axial flux flow. Some permanent magnet-less, brushless synchronous systems include an uncluttered rotor coupled to outer laminations. The quadrature-axis inductance may be increased in some synchronous systems. Some synchronous systems convert energy such as mechanical energy into electrical energy (e.g., a generator); other synchronous systems may convert any form of energy into mechanical energy (e.g., a motor).

Hsu, John S.

2013-03-05T23:59:59.000Z

230

Installation package for Hyde Memorial Observatory, Lincoln, Nebraska  

DOE Green Energy (OSTI)

This report contains installation information for a solar heating system installed in Hyde Memorial Observatory at Lincoln, Nebraska. This package includes a system operation and maintenance manual, hardware brochures, schematics, system operating modes and drawings. The Solar Engineering and Equipment Company (SEECO) developed this prototype solar heating system, which consists of the following subsystems: solar collector, control, and storage.

Not Available

1978-12-01T23:59:59.000Z

231

Tracking the Sun II The Installed Cost of Photovoltaics  

E-Print Network (OSTI)

the Sun II Contents The Installed Cost of Photovoltaics in the U.S. from 1998-2008 Environmental Energy .................................................................... 10 4. PV Incentive and Net Installed Cost Trends ....................................... 24 5 Appendix A: Data Cleaning, Coding, and Standardization ....................... 33 Appendix B: Detailed

232

Performance Testing of Window Installation and Flashing Details  

E-Print Network (OSTI)

Protection of interface at windows and other penetrations from rainwater intrusion is a primary need of building structures. This is especially true when the building is in a high weather exposure location or in a climate in which the ability for walls to dry may be limited. Two areas of specific concern are: 1) the bottom corners of windows where damage is most commonly seen, and 2) the area around curved, arched or round-top windows where it is difficult to install the standard flashing materials. This paper reviews performance testing of window flashing installation methods commonly used in the trade, as well as improved methods made possible by recent advancements in flashing products. A series of laboratory tests were designed to determine water resistance, air leakage resistance and durability of several installation methods with different flashing materials. Windows were installed in test wall sections using several methods. The installations were monitored and evaluated for ease of installation and then tested for air leakage and water resistance using ASTM E283 and ASTM E331. The durability of the installations was then evaluated by subjecting the walls to thermal cycling (0 to 160oF) and retesting for water resistance using ASTM E331. Recommendations for best practice installation based on the testing results and key material selection issues are presented.

Weston, T. A.; Herrin, J.

2002-01-01T23:59:59.000Z

233

Design and installation package for solar hot water system  

DOE Green Energy (OSTI)

This report contains the design and installation procedure for the Solar Engineering and Manufacturing Company's solar hot water system. Included are the system performance specifications, system design drawings, hazard analysis and other information necessary to evaluate the design and instal the system.

Not Available

1978-12-01T23:59:59.000Z

234

Targeting Net Zero Energy for Military Installations (Presentation)  

Science Conference Proceedings (OSTI)

Targeting Net Zero Energy for Military Installations in Kaneohe Bay, Hawaii. A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.

Burman, K.

2012-05-01T23:59:59.000Z

235

Installation and Commissioning Automated Demand Response Systems  

Science Conference Proceedings (OSTI)

Demand Response (DR) can be defined as actions taken to reduce electric loads when contingencies, such as emergencies and congestion, occur that threaten supply-demand balance, or market conditions raise supply costs. California utilities have offered price and reliability DR based programs to customers to help reduce electric peak demand. The lack of knowledge about the DR programs and how to develop and implement DR control strategies is a barrier to participation in DR programs, as is the lack of automation of DR systems. Most DR activities are manual and require people to first receive notifications, and then act on the information to execute DR strategies. Levels of automation in DR can be defined as follows. Manual Demand Response involves a labor-intensive approach such as manually turning off or changing comfort set points at each equipment switch or controller. Semi-Automated Demand Response involves a pre-programmed demand response strategy initiated by a person via centralized control system. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. The receipt of the external signal initiates pre-programmed demand response strategies. We refer to this as Auto-DR (Piette et. al. 2005). Auto-DR for commercial and industrial facilities can be defined as fully automated DR initiated by a signal from a utility or other appropriate entity and that provides fully-automated connectivity to customer end-use control strategies. One important concept in Auto-DR is that a homeowner or facility manager should be able to 'opt out' or 'override' a DR event if the event comes at time when the reduction in end-use services is not desirable. Therefore, Auto-DR is not handing over total control of the equipment or the facility to the utility but simply allowing the utility to pass on grid related information which then triggers facility defined and programmed strategies if convenient to the facility. From 2003 through 2006 Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) developed and tested a series of demand response automation communications technologies known as Automated Demand Response (Auto-DR). In 2007, LBNL worked with three investor-owned utilities to commercialize and implement Auto-DR programs in their territories. This paper summarizes the history of technology development for Auto-DR, and describes the DR technologies and control strategies utilized at many of the facilities. It outlines early experience in commercializing Auto-DR systems within PG&E DR programs, including the steps to configure the automation technology. The paper also describes the DR sheds derived using three different baseline methodologies. Emphasis is given to the lessons learned from installation and commissioning of Auto-DR systems, with a detailed description of the technical coordination roles and responsibilities, and costs.

Global Energy Partners; Pacific Gas and Electric Company; Kiliccote, Sila; Kiliccote, Sila; Piette, Mary Ann; Wikler, Greg; Prijyanonda, Joe; Chiu, Albert

2008-04-21T23:59:59.000Z

236

Would You Consider Installing a Cool Roof? | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Would You Consider Installing a Cool Roof? Would You Consider Installing a Cool Roof? Would You Consider Installing a Cool Roof? August 12, 2010 - 7:30am Addthis On Monday, Erin discussed cool roof technologies and how they can improve the comfort of buildings while reducing energy costs. Would you consider installing a cool roof? Why or why not? Each Thursday, you have the chance to share your thoughts on a question about energy efficiency or renewable energy for consumers. Please comment with your answers, and also feel free to respond to other comments. E-mail your responses to the Energy Saver team at consumer.webmaster@nrel.gov. Addthis Related Articles Would You Consider Driving a Vehicle that Can Run on Biodiesel? Would You Consider Installing a Cool Roof? Tips: Energy-Efficient Roofs How Do You Save Water When Caring for Your Lawn?

237

Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Compliance with the following permit will allow the installation and operation of electric vehicle charging equipment at a Compliance with the following permit will allow the installation and operation of electric vehicle charging equipment at a residence in the City, State jurisdiction. This permit addresses one of the following situations: Only an additional branch circuit would be added at the residence A hard-wired charging station would be installed at the residence. The attached requirements for wiring the charging station are taken directly out of the 2011 edition of the National Electrical Code (NEC) NFPA 70, Article 625 Electric Vehicle Charging System. This article does not provide all of the information necessary for the installation of electric vehicle charging equipment. Please refer to the current edition of the electrical code adopted by the local jurisdiction for additional installation requirements. Reference to the 2011 NEC may be

238

Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Two Million Smart Grid Meters Installed Two Million Smart Grid Meters Installed Nationwide Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide August 31, 2010 - 12:00am Addthis Columbus, OH - At an event today at Battelle headquarters in Columbus, Ohio, U.S. Energy Secretary Steven Chu announced that two million smart grid meters have been installed across the country, helping to reduce energy costs for families and businesses. As a result of funding from the Recovery Act, smart grid technology is speeding the modernization of the nation's electrical grid, helping to reduce the amount of time needed to respond to energy disruptions and enable consumers to monitor their energy consumption and costs. So far, more than 180,000 smart meters have been installed in Ohio. "As a result of an unprecedented investment from the Recovery Act, smart

239

ARRA Program Celebrates Milestone 600,000 Smart Meter Installations |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ARRA Program Celebrates Milestone 600,000 Smart Meter Installations ARRA Program Celebrates Milestone 600,000 Smart Meter Installations ARRA Program Celebrates Milestone 600,000 Smart Meter Installations April 17, 2012 - 3:09pm Addthis On April 11, 2012, DOE Recovery Act funding recipient Sacramento Municipal Utility District (SMUD) celebrated a major milestone in the development of a regional smart grid in California: the installation of over 600,000 smart meters. For the event, Congresswoman Doris Matsui (D-Sacramento) visited SMUD's customer service center and praised the program for implementing a system "that will be more efficient, more reliable, and better for consumers." SMUD's meter installations are nearly complete, with only a few thousand remaining. In addition to smart meters, SMUD's grid modernization efforts will include automated distribution systems, a

240

Solar, Wind, Hydropower: Home Renewable Energy Installations | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar, Wind, Hydropower: Home Renewable Energy Installations Solar, Wind, Hydropower: Home Renewable Energy Installations Solar, Wind, Hydropower: Home Renewable Energy Installations April 17, 2013 - 1:44pm Addthis This Lakewood, Colorado home was built in 1956. Brent and Mo Nelson upgraded the home with multiple solar technologies including; daylighting, passive solar and active solar. They also have an 80 gallon solar hot water heater. | Photo by Dennis Schroeder, National Renewable Energy Laboratory. This Lakewood, Colorado home was built in 1956. Brent and Mo Nelson upgraded the home with multiple solar technologies including; daylighting, passive solar and active solar. They also have an 80 gallon solar hot water heater. | Photo by Dennis Schroeder, National Renewable Energy Laboratory. Homeowner Andrea Mitchel, with installer Joe Guasti, proudly shows off small wind turbine installed in Oak Hills, CA. | Photo by Karin Sinclair, National Renewable Energy Laboratory.

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

V-053: Adobe Shockwave player installs Xtras without prompting | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Adobe Shockwave player installs Xtras without prompting 3: Adobe Shockwave player installs Xtras without prompting V-053: Adobe Shockwave player installs Xtras without prompting December 24, 2012 - 12:15am Addthis PROBLEM: Adobe Shockwave player installs Xtras without prompting PLATFORM: Adobe Shockwave Player ABSTRACT: A vulnerability was reported in Adobe Shockwave. REFERENCE LINKS: Vulnerability Note VU#519137 SecurityTracker Alert ID: 1027903 Bugtraq ID: 56972 CVE-2012-6271 IMPACT ASSESSMENT: Medium DISCUSSION: Adobe Shockwave Player through 11.6.8.638 allows remote attackers to trigger installation of arbitrary signed Xtras via a Shockwave movie that contains an Xtra URL, as demonstrated by a URL for an outdated Xtra. IMPACT: By convincing a user to view a specially crafted Shockwave content, an attacker may be able to execute arbitrary code with the privileges of the

242

From permanence to total availability: a quantum conceptual upgrade  

E-Print Network (OSTI)

We consider the classical concept of time of permanence and observe that its quantum equivalent is described by a bona fide self-adjoint operator. Its interpretation, by means of the spectral theorem, reveals that we have to abandon not only the idea that quantum entities would be characterizable in terms of spatial trajectories but, more generally, that they would possess the very attribute of spatiality. Consequently, a permanence time shouldn't be interpreted as a "time" in quantum mechanics, but as a measure of the total availability of a quantum entity in participating to a creative process of spatial localization.

de Bianchi, Massimiliano Sassoli

2010-01-01T23:59:59.000Z

243

LBNL-5800E Thermal Performance Impacts of Center-of- Glass Deflections in Installed Insulating  

NLE Websites -- All DOE Office Websites (Extended Search)

00E 00E Thermal Performance Impacts of Center-of- Glass Deflections in Installed Insulating Glazing Units R.G. Hart Lawrence Berkeley National Laboratory C.W. Goudey Lawrence Berkeley National Laboratory D.K. Arasteh Lawrence Berkeley National Laboratory D.C. Curcija Lawrence Berkeley National Laboratory Windows and Envelope Materials Group Building Technology and Urban Systems Department Environmental Energy Technologies Division June 2012 To be published in Energy and Buildings DISCLAIMER This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor The Regents of the University of

244

New Berkeley Lab Report Tracks a Decade of PV Installed Cost Trends  

DOE Green Energy (OSTI)

Installations of PV systems have been expanding at a rapid pace in recent years. In the United States, the market for PV is driven by national, state, and local government incentives, including upfront cash rebates, production-based incentives, requirements that electricity suppliers purchase a certain amount of solar energy, and Federal and state tax benefits. These programs are, in part, motivated by the popular appeal of solar energy and by the positive attributes of PV - e.g., modest environmental impacts, avoidance of fuel price risks, coincidence with peak electrical demand, and the location of PV at the point of use. Given the relatively high cost of PV, however, a key goal of these policies is to encourage cost reductions over time. Therefore, as policy incentives have become more significant and as PV deployment has accelerated, so too has the desire to track the installed cost of PV systems over time, by system characteristics, by system location, and by component. A new Lawrence Berkeley National Laboratory report, 'Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007', helps to fill this need by summarizing trends in the installed cost (i.e., the cost paid by the system owner) of grid-connected PV systems in the U.S. The report is based on an analysis of project-level cost data from nearly 37,000 residential and non-residential PV systems completed from 1998-2007 and installed on the utility-customer-side of the meter. These systems total 363 MW, equal to 76% of all grid-connected PV capacity installed in the U.S. through 2007, representing the most comprehensive data source available on the installed cost of PV in the United States. The data were obtained from administrators of PV incentive programs around the country, who typically collect installed cost data for systems receiving incentives. A total of 16 programs, spanning 12 states, ultimately provided data for the study. Reflecting the broader geographical trends in the U.S. PV market, the vast majority of the systems in the data sample are located in California (83%, by capacity) and New Jersey (12%), The remaining systems are located in Arizona, Connecticut, Illinois, Massachusetts, Maryland, Minnesota, New York, Oregon, Pennsylvania, and Wisconsin. The PV systems in the dataset range in size from 100 W to 1.3 MW, almost 90% of which are smaller than 10 kW. This article briefly summarizes some of the key findings from the Berkeley Lab study (the full report can be downloaded at http://eetd.lbl.gov/ea/emp/re-pubs.html). The article begins by summarizing trends related to the installed cost of PV systems prior to receipt of any financial incentives, and then discusses how changes in incentive levels over time and variation across states have impacted the net installed cost of PV to the customer, after receipt of incentives. Note that all cost and incentive data are presented in real 2007 dollars (2007$), and all capacity and dollars-perwatt ($/W) data are presented in terms of rated module power output under Standard Test Conditions (DC-STC).

Barbose, Galen; Peterman, Carla; Wiser, Ryan

2009-04-15T23:59:59.000Z

245

Net Zero Energy Military Installations: A Guide to Assessment and Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Zero Energy Military Net Zero Energy Military Installations: A Guide to Assessment and Planning Samuel Booth, John Barnett, Kari Burman, Josh Hambrick and Robert Westby Technical Report NREL/TP-7A2-48876 August 2010 Technical Report Net Zero Energy Military NREL/TP-7A2-48876 Installations: A Guide to August 2010 Assessment and Planning Samuel Booth, John Barnett, Kari Burman, Josh Hambrick and Robert Westby Prepared under Task No. IDOD.1010 National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

246

Solar site test module. [DOE/NASA solar heating and cooling demonstration installations  

SciTech Connect

A solar site test module using the Rockwell AIM 65 micro-computer is described. The module is designed to work at any site where an IBM site data acquisition system (SDAS) is installed and is intended primarily as a troubleshooting tool for DOE/NASA commercial solar heating and cooling system demonstration installations. It collects sensor information (temperatures, flow rates, etc.) and displays or prints it immediately in calibrated engineering units. It will read one sensor on demand, periodically read up to 10 sensors or periodically read all sensors. Performance calculations can also be included with sensor data. Unattended operation is possible to, e.g., monitor a group of sensors once per hour. Work is underway to add a data acquisition system to the test module so that it can be used at sites which have no SDAS.

Kissel, R.R.; Scott, D.R.

1980-07-01T23:59:59.000Z

247

C:\WINNT\Profiles\caseys\DESKTOP\L T R C\PICs Program\Permanent Markers\PM Test Plan.PDF  

NLE Websites -- All DOE Office Websites (Extended Search)

0-3175 0-3175 Permanent Markers Testing Program Plan September 28, 2000 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Area Office Carlsbad, New Mexico Permanent Markers Testing Program Plan Waste Isolation Pilot Plant Carlsbad, New Mexico DOE/WIPP 00-3175 September 28, 2000 DOE/WIPP 00-3175 -i- Table of Contents List of Abbreviations and Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv 1.0 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2.0 Markers Testing Program Organization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 3.0 Markers Systems Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 3.1 Screening Phase . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 3.1.1 Large Surface Markers . . . . . . . . . . . .

248

Preliminary assessment report for Fort Jacob F. Wolters, Installation 48555, Mineral Wells, Texas. Installation Restoration Program  

SciTech Connect

This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (TXARNG) property near Mineral Wells, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Wolters property, the requirement of the Department of Defense Installation Restoration Program.

Dennis, C.B.

1993-08-01T23:59:59.000Z

249

Preliminary assessment report for Waiawa Gulch, Installation 15080, Pearl City, Oahu, Hawaii. Installation Restoration Program  

SciTech Connect

This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Hawaii Army National Guard (HIARNG) property near Pearl City, Oahu, Hawaii. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Waiawa Gulch property, phase I of the Department of Defense Installation Restoration Program (IRP).

Not Available

1993-08-01T23:59:59.000Z

250

UNITED STATES HOUSE OF REPRESENTATIVES HOUSE PERMANENT SELECT COMMITTEE ON INTELLIGENCE  

E-Print Network (OSTI)

Soviet Union; · the nuclear weapons programs of India and Pakistan; · transfer of military and dual of the Department of Energy in the Carter Administration my responsibilities included our nuclear weapons program close attention to: · North Korea's nuclear program; · "loose nukes" in Russia and states of the former

Deutch, John

251

An Improved Sensorless Control System of Permanent Magnet Synchronous Motor  

Science Conference Proceedings (OSTI)

To improve the performance of permanent magnet synchronous motor sensor less control system, the phase offset caused by the low pass filter must be considering. In this paper, to apply the linear control theory to PMSM system. The introduced control ... Keywords: PMSM, Reduced-order Observer, Group Time Delay, Adaptive, Sensorless

Long Tang, Hong-Lin Ou Yang, Chao Meng, Xin-Yuan Li, Xu-Jie Mo

2013-01-01T23:59:59.000Z

252

Permanent Closure of the TAN-664 Underground Storage Tank  

SciTech Connect

This closure package documents the site assessment and permanent closure of the TAN-664 gasoline underground storage tank in accordance with the regulatory requirements established in 40 CFR 280.71, 'Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks: Out-of-Service UST Systems and Closure.'

Bradley K. Griffith

2011-12-01T23:59:59.000Z

253

Adaptive friction compensation for permanent magnet linear synchronous motor  

Science Conference Proceedings (OSTI)

The paper discussed an adaptive friction compensation scheme based on Coulomb friction and a parameter identifier. The model reference adaptive system based on Coulomb friction was designed to compensate the friction on-line. The designed model reference ... Keywords: friction compensation, model reference adaptive control, parameter identification, permanent magnet linear synchronous motor (PMLSM)

Wang Li-Mei; Wu Lin

2009-06-01T23:59:59.000Z

254

Nominal Position Controller for Permanent Magnet Synchronous Motor System  

Science Conference Proceedings (OSTI)

A nonlinear position controller for permanent magnet synchronous motor (PMSM) was designed to achieve position tracing control and robust control. The controller included two parts: the model controller and the robust controller. The former was designed ... Keywords: PMSM, nominal control, sliding mode control

Yuzeng Zhang; Fan Wang; Mingyin Yan

2010-05-01T23:59:59.000Z

255

PERMANENT MAGNET DESIGNS WITH LARGE VARIATIONS IN FIELD STRENGTH.  

Science Conference Proceedings (OSTI)

The use of permanent magnets has been investigated as an option for electron cooling ring for the proposed luminosity upgrade of RHIC. Several methods have been developed that allow a large variation in field strength. These design concepts were verified with computer simulations using finite element codes. It will be shown that the field uniformity is maintained while the field strength is mechanically adjusted.

GUPTA,R.

2004-01-21T23:59:59.000Z

256

Axial-flux modular permanent-magnet generator with a toroidal winding for wind-turbine applications  

SciTech Connect

Permanent-magnet (PM) generators have been used for wind turbines for many years. Many small wind-turbine manufacturers use direct-drive PM generators. For wind-turbine generators, the design philosophy must cover the following characteristics: low cost, light weight, low speed, high torque, and variable-speed generation. The generator is easy to manufacture and the design can be scaled up for a larger size without major retooling. A modular PM generator with axial flux direction was chosen. The permanent magnet used is NdFeB or ferrite magnet with flux guide to focus flux density in the air gap. Each unit module of the generator may consist of one, two, or more phases. Each generator can be expanded to two or more unit modules. Each unit module is built from simple modular poles. The stator winding is formed like a torus. Thus, the assembly process is simplified and the winding insertion in the slot is less tedious. The authors built a prototype of one unit module and performed preliminary tests in the laboratory. Follow-up tests will be conducted in the laboratory to improve the design.

Muljadi, E.; Butterfield, C.P.; Wan, Y.H.

1999-08-01T23:59:59.000Z

257

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

Wind Powering America (EERE)

  Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 006 Contents Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 U.S. Wind Power Capacity Increased by 7% in 006 . . . . . . . . . . . . . . . .4 The United States Leads the World in Annual Capacity Growth . . . . . . . .4 Texas, Washington, and California Lead the U.S. in Annual Capacity Growth . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 GE Wind Is the Dominant Turbine Manufacturer, with Siemens Gaining Market Share . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 Average Turbine Size Continues to Increase . . . . . . . . . . . . . . . . . . . . . . .7 Developer Consolidation Accelerates . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 Innovation and Competition in Non-Utility Wind Financing Persists . . . .9

258

The Installed Base of Distributed Electrical Generating Resources in the U.S.  

Science Conference Proceedings (OSTI)

The generation of electric power at or near electric loads, referred to here as distributed resources (DR), has received considerable attention during recent years, with some experts projecting that DR technologies may provide up to 30 percent of all new generation resources installed in the United States within a couple of decades. There are, in fact, many electric generators in place that are or could be used as DR. There has not, however, been a concerted effort to quantify this fleet nor to understan...

2003-01-21T23:59:59.000Z

259

Series 50 propane-fueled Nova bus: Engine development, installation, and field trials  

SciTech Connect

The report describes a project to develop the Detroit Diesel series 50 liquefied propane gas (LPG) heavy-duty engine and to conduct demonstrations of LPG-fuelled buses at selected sites (Halifax Regional Municipality and three sites in the United States). The project included five main elements: Engine development and certification, chassis re-engineering and engine installation, field demonstration, LPG fuel testing, and LPG fuel variability testing. Lessons learned with regard to engine design and other issues are discussed, and recommendations are made for further development and testing.

Smith, B.

1999-01-01T23:59:59.000Z

260

Oklahoma Tribe to Install Solar Roof | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oklahoma Tribe to Install Solar Roof Oklahoma Tribe to Install Solar Roof Oklahoma Tribe to Install Solar Roof March 22, 2010 - 6:10pm Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE What does this project do? The new fully functioning roof and solar energy production plant will save the tribe about $20,000 a year. The Delaware Nation, a federally-recognized tribe of about 1,400 people in Anadarko, Okla., will install solar panel roofs on two tribal government buildings as part of a larger effort to become more sustainable and bring new jobs to an area struggling with high unemployment. "It's the start of a green initiative," says Theda McPheron-Keel, president of Wind Hollow Foundation, a nonprofit organization aimed at helping American Indians improve their lives. "It provides economic

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Carpe Diem: Install Insulated Roman Shades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carpe Diem: Install Insulated Roman Shades Carpe Diem: Install Insulated Roman Shades Carpe Diem: Install Insulated Roman Shades March 16, 2010 - 11:44am Addthis John Lippert As I mentioned in yesterday's blog, I had insulated window quilts installed on most of my home's windows. I should have bought window quilts for all of our windows, but I refrained from doing so on two downstairs windows to save money (which, in the long run, I didn't). There were window shades already there; they didn't do much from a thermal perspective, but they did provide privacy and room darkening. Well, they need to be replaced now, and I'm looking again at high efficiency thermal window shades. This time I'm considering thermal Roman shades. About a dozen years ago my wife and I went on the Tour of Solar Homes, the local component of the annual National Solar Tour sponsored by the American

262

Hawaii Marine Base Installs Solar Roofs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marine Base Installs Solar Roofs Marine Base Installs Solar Roofs Hawaii Marine Base Installs Solar Roofs April 2, 2010 - 2:42pm Addthis Lorelei Laird Writer, Energy Empowers What does this project do? Marine Corps Base Hawaii replaced roofs on two buildings with polyvinyl chloride membrane 'cool' roofs and solar panels. The new roofs saves $20,000 a year in energy costs. Built on the end of the Mokapu Peninsula on Oahu's northeast coast, the Marine Corps Base Hawaii (MCBH) at Kaneohe Bay gets plenty of sunlight. But harnessing that sunlight to create renewable electricity was considered too expensive to be practical - until 2008. That's when MCBH took advantage of planned maintenance funding to help offset the high cost of installing photovoltaic panels on the base. As a military entity, MCBH can't directly take advantage of federal or state

263

Home Solar Installations: Things to Consider | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Home Solar Installations: Things to Consider Home Solar Installations: Things to Consider Home Solar Installations: Things to Consider May 29, 2013 - 3:18pm Addthis Home solar systems can save you energy and money. | Photo courtesy of Dennis Schroeder, NREL 22168. Home solar systems can save you energy and money. | Photo courtesy of Dennis Schroeder, NREL 22168. Erin Connealy Communications Specialist, Office of Energy Efficiency and Renewable Energy How can I participate? Read these considerations for installing a home solar electric system to evaluate whether it is a good choice for your home. Well, it's that time of year! Days are getting longer and the weather is getting warmer. How can you take advantage of longer sunlight hours? Dinner on your porch might be one good solution, but an even better one might be

264

Secretary Chu Announces Two Million Smart Grid Meters Installed...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

needed to respond to energy disruptions and enable consumers to monitor their energy consumption and costs. So far, more than 180,000 smart meters have been installed in Ohio. "As...

265

Valuation of potash reserves at the Waste Installation Pilot Plant  

Science Conference Proceedings (OSTI)

Monte Carlo simulation was used in conjunction with several random walk price and cost models to value potash reserves at the Waste Installation Pilot Plant (WIPP) site new Carlsbad, New Mexico. Selection of market price and product processing cost models ...

Peter C. Anselmo

1996-11-01T23:59:59.000Z

266

Vet's company installing solar across Massachusetts | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vet's company installing solar across Massachusetts Vet's company installing solar across Massachusetts Vet's company installing solar across Massachusetts February 25, 2010 - 4:09pm Addthis Dan Leary, a U.S. Army veteran, is president of Nexamp Inc., a clean energy company that specializes in solar installation. Dan founded the company in 2006 and has witnessed its impressive growth from six employees to 65 and counting as of July 2010. The small company recently reached a significant milestone - it was awarded one of the largest solar contracts in Massachusetts. Dan served in the military for seven years, reaching the rank of captain in the Army. He says his idea for a clean energy company came in 2005 when he was pursuing his M.B.A while serving in Kuwait. "For my final project, I wrote a business plan for a clean energy

267

Hawaii Marine Base Installs Solar Roofs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hawaii Marine Base Installs Solar Roofs Hawaii Marine Base Installs Solar Roofs Hawaii Marine Base Installs Solar Roofs April 2, 2010 - 2:42pm Addthis Lorelei Laird Writer, Energy Empowers What does this project do? Marine Corps Base Hawaii replaced roofs on two buildings with polyvinyl chloride membrane 'cool' roofs and solar panels. The new roofs saves $20,000 a year in energy costs. Built on the end of the Mokapu Peninsula on Oahu's northeast coast, the Marine Corps Base Hawaii (MCBH) at Kaneohe Bay gets plenty of sunlight. But harnessing that sunlight to create renewable electricity was considered too expensive to be practical - until 2008. That's when MCBH took advantage of planned maintenance funding to help offset the high cost of installing photovoltaic panels on the base. As a military entity, MCBH can't directly take advantage of federal or state

268

Energy Department Completes Cool Roof Installation on DC Headquarters  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Completes Cool Roof Installation on DC Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy Energy Department Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy December 14, 2010 - 12:00am Addthis Washington - Secretary Steven Chu today announced the completion of a new cool roof installation on the Department of Energy's Headquarters West Building. There was no incremental cost to adding the cool roof as part of the roof replacement project and it will save taxpayers $2,000 every year in building energy costs. Cool roofs use lighter-colored roofing surfaces or special coatings to reflect more of the sun's heat, helping improve building efficiency, reduce cooling costs and offset carbon emissions. The cool roof and increased insulation at the facility were

269

Energy Secretary Chu Announces Five Million Smart Meters Installed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Announces Five Million Smart Meters Installed Announces Five Million Smart Meters Installed Nationwide as Part of Grid Modernization Effort Energy Secretary Chu Announces Five Million Smart Meters Installed Nationwide as Part of Grid Modernization Effort June 13, 2011 - 12:00am Addthis Washington, DC - At a White House Grid Modernization event today, U.S. Department of Energy Secretary Steven Chu announced that more than five million smart meters have been installed nationwide as part of Recovery Act-funded efforts to accelerate modernization of the Nation's electric grid. Smart meters will provide utility companies with greater information about how much electricity is being used throughout their service areas. They will also give consumers access to real-time information about their energy consumption, allowing them to make well-informed decisions about how

270

Newly Installed Alaska North Slope Well Will Test Innovative Hydrate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Newly Installed Alaska North Slope Well Will Test Innovative Newly Installed Alaska North Slope Well Will Test Innovative Hydrate Production Technologies Newly Installed Alaska North Slope Well Will Test Innovative Hydrate Production Technologies May 17, 2011 - 1:00pm Addthis Washington, DC - A fully instrumented well that will test innovative technologies for producing methane gas from hydrate deposits has been safely installed on the North Slope of Alaska. As a result, the "Iġnik Sikumi" (Iñupiaq for "fire in the ice") gas hydrate field trial well will be available for field experiments as early as winter 2011-12. The well, the result of a partnership between ConocoPhillips and the Office of Fossil Energy's (FE) National Energy Technology Laboratory, will test a technology that involves injecting carbon dioxide (CO2) into sandstone

271

Property:Project Installed Capacity (MW) | Open Energy Information  

Open Energy Info (EERE)

Installed Capacity (MW) Installed Capacity (MW) Jump to: navigation, search Property Name Project Installed Capacity (MW) Property Type String Pages using the property "Project Installed Capacity (MW)" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + 0 + MHK Projects/ADM 5 + 1 + MHK Projects/AWS II + 1 + MHK Projects/Admirality Inlet Tidal Energy Project + 22 + MHK Projects/Agucadoura + 2 + MHK Projects/Alaska 18 + 10 + MHK Projects/Alaska 36 + 10 + MHK Projects/Algiers Cutoff Project + 16 + MHK Projects/Algiers Light Project + 0 + MHK Projects/Anconia Point Project + 0 + MHK Projects/Ashley Point Project + 0 + MHK Projects/Astoria Tidal Energy + 300 + MHK Projects/Avondale Bend Project + 0 + MHK Projects/Bar Field Bend + 0 +

272

Oklahoma Tribe to Install Solar Roof | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oklahoma Tribe to Install Solar Roof Oklahoma Tribe to Install Solar Roof Oklahoma Tribe to Install Solar Roof March 22, 2010 - 6:10pm Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE What does this project do? The new fully functioning roof and solar energy production plant will save the tribe about $20,000 a year. The Delaware Nation, a federally-recognized tribe of about 1,400 people in Anadarko, Okla., will install solar panel roofs on two tribal government buildings as part of a larger effort to become more sustainable and bring new jobs to an area struggling with high unemployment. "It's the start of a green initiative," says Theda McPheron-Keel, president of Wind Hollow Foundation, a nonprofit organization aimed at helping American Indians improve their lives. "It provides economic

273

Home Solar Installations: Things to Consider | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Home Solar Installations: Things to Consider Home Solar Installations: Things to Consider Home Solar Installations: Things to Consider May 29, 2013 - 3:18pm Addthis Home solar systems can save you energy and money. | Photo courtesy of Dennis Schroeder, NREL 22168. Home solar systems can save you energy and money. | Photo courtesy of Dennis Schroeder, NREL 22168. Erin Connealy Communications Specialist, Office of Energy Efficiency and Renewable Energy How can I participate? Read these considerations for installing a home solar electric system to evaluate whether it is a good choice for your home. Well, it's that time of year! Days are getting longer and the weather is getting warmer. How can you take advantage of longer sunlight hours? Dinner on your porch might be one good solution, but an even better one might be

274

Property:EZFeed/InstalledCapacity | Open Energy Information  

Open Energy Info (EERE)

InstalledCapacity InstalledCapacity Jump to: navigation, search Property Name EZFeed/InstalledCapacity Property Type String Description EZFeed Installed Capacity property Subproperties This property has the following 6079 subproperties: 2 2003 Climate Change Fuel Cell Buy-Down Program (Federal) 3 30% Business Tax Credit for Solar (Vermont) 4 401 Certification (Vermont) A AEP (Central and North) - CitySmart Program (Texas) AEP (Central and North) - Residential Energy Efficiency Programs (Texas) AEP (Central and SWEPCO) - Coolsaver A/C Tune Up (Texas) AEP (Central, North and SWEPCO) - Commercial Solutions Program (Texas) AEP (SWEPCO) - Residential Energy Efficiency Programs (Texas) AEP Appalachian Power - Commercial and Industrial Rebate Programs (West Virginia) AEP Appalachian Power - Residential Home Retrofit Program (West Virginia)

275

Obama Administration Announces Plans to Install New Solar Panels...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

By installing solar panels on their homes, consumers are able to effectively lock in the price of electricity they will pay in the years ahead, acting as an insulator against...

276

NREL: Wind Research - White Earth Nation Installs Turbines: A...  

NLE Websites -- All DOE Office Websites (Extended Search)

White Earth Nation Installs Turbines: A Wind Powering America Success Story February 11, 2013 Almost 8 years after taking the initial steps to harness the wind, the White Earth...

277

Milwaukee Installer Reflects on His Career In Solar | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

An Interview with the CEO of Helios Solar Works Milwaukee solar installers putting in a rooftop solar energy system on Dr. Paula Papanek's home. | Photo courtesy of Dr. Paula...

278

Energy Department Launches SunShot Prize Competition to Install...  

NLE Websites -- All DOE Office Websites (Extended Search)

the start of a new competition to make it faster, easier, and cheaper to install rooftop solar energy systems. The SunShot Prize makes a total of 10 million in cash...

279

OpenEI/PageKeyword Solar Installations | Open Energy Information  

Open Energy Info (EERE)

Data Special page Share this page on Facebook icon Twitter icon OpenEIPageKeyword Solar Installations Jump to: navigation, search A list of all pages that have property...

280

North Shore Gas Single Family Direct Install (Illinois)  

Energy.gov (U.S. Department of Energy (DOE))

Owners of single-family homes, condos, townhomes and two-flats may be eligible for a free installation of new programmable thermostats, pipe insulation, showerheads, and faucet aerators through...

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Seeing solar on campus : a visible photovoltaic installation on campus  

E-Print Network (OSTI)

This paper presents a methodology for selecting a site on the MIT campus for a visible solar photovoltaic installation. Visibility, solar exposure, advertising potential, aesthetics, interactivity and direct or important ...

Guarda, Daniel Jair Alves

2006-01-01T23:59:59.000Z

282

DOE-DOD Emergency Backup Power Fuel Cell Installations  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-DOD Emergency Backup Power Fuel Cell Installations On July 19, 2011, the U.S. Department of Energy (DOE) announced that, as part of an interagency partnership with the U.S....

283

Permanent Rules and Executive Orders effective as of 07-22-2010  

NLE Websites -- All DOE Office Websites (Extended Search)

Rules and Executive Orders effective as of 07-22-2010 Rules and Executive Orders effective as of 07-22-2010 Title 748 - Uniform Building Code Commission Chapter 1 Administrative Operations Chapter 3 General Provisions Chapter 5 Fees and Collection of Fees Chapter 7 Commission Committees Chapter 10 Code Adoption Procedures Chapter 15 Code Adopted by State Agencies and Political Subdivisions Permanent Rules and Executive Orders effective as of 07-22-2010 Title 748 - Uniform Building Code Commission Chapter 1 - Administrative Operations 748:1-1-1. Organization The employees of the Commission shall be organized and divided into such divisions or units, as the Commission deems desirable for efficiency. Such organization and division may be revised by the Commission as it finds necessary or expedient. Copies of the organizational chart are available upon

284

Replacement energy, capacity, and reliability costs for permanent nuclear reactor shutdowns  

SciTech Connect

Average replacement power costs are estimated for potential permanent shutdowns of nuclear electricity-generating units. Replacement power costs are considered to include replacement energy, capacity, and reliability cost components. These estimates were developed to assist the US Nuclear Regulatory Commission in evaluating regulatory issues that potentially affect changes in serious reactor accident frequencies. Cost estimates were derived from long-term production-cost and capacity expansion simulations of pooled utility-system operations. Factors that affect replacement power cost, such as load growth, replacement sources of generation, and capital costs for replacement capacity, were treated in the analysis. Costs are presented for a representative reactor and for selected subcategories of reactors, based on estimates for 112 individual reactors.

VanKuiken, J.C., Buehring, W.A.; Hamilton, S.; Kavicky, J.A.; Cavallo, J.D.; Veselka, T.D.; Willing, D.L. [Argonne National Lab., IL (United States)

1993-10-01T23:59:59.000Z

285

Repowering Wind Projects in the United States  

Science Conference Proceedings (OSTI)

Wind turbines installed throughout the United States in the 1980s and early 1990s are reaching the end of their useful lives. Owners and developers are faced with the decision to repower, refurbish, or decommission these older wind projects. This report presents an overview of wind repowering experience in Europe and the United States, including the identification of repowered projects, a summary of legislation affecting repowering in Europe, and an analysis of drivers and barriers for repowering ...

2012-10-19T23:59:59.000Z

286

Parameter estimation of permanent magnet stepper motors without position or velocity sensors  

E-Print Network (OSTI)

Parameter estimation of permanent magnet stepper motors without position or velocity sensors Romain identification method for permanent magnet stepper motors. Current sensors are assumed available, but position magnet stepper motors, syn- chronous motors, sensorless systems, parameter identification, elimination

Paris-Sud XI, Université de

287

An issue of permanence: assessing the effectiveness of temporary carbon storage  

E-Print Network (OSTI)

In this paper, we present a method to quantify the effectiveness of carbon mitigation options taking into account the "permanence" of the emissions reduction. While the issue of permanence is most commonly associated with ...

Herzog, Howard J.

288

depleted underground oil shale for the permanent storage of carbon  

NLE Websites -- All DOE Office Websites (Extended Search)

depleted underground oil shale for the permanent storage of carbon depleted underground oil shale for the permanent storage of carbon dioxide (CO 2 ) generated during the oil shale extraction process. AMSO, which holds a research, development, and demonstration (RD&D) lease from the U.S. Bureau of Land Management for a 160-acre parcel of Federal land in northwest Colorado's oil-shale rich Piceance Basin, will provide technical assistance and oil shale core samples. If AMSO can demonstrate an economically viable and environmentally acceptable extraction process, it retains the right to acquire a 5,120-acre commercial lease. When subject to high temperatures and high pressures, oil shale (a sedimentary rock that is rich in hydrocarbons) can be converted into oil. Through mineralization, the CO 2 could be stored in the shale

289

Hanford Permanent Isolation Barrier Program: Asphalt technology test plan  

SciTech Connect

The Hanford Permanent Isolation Barriers use engineered layers of natural materials to create an integrated structure with backup protective features. The objective of current designs is to develop a maintenance-free permanent barrier that isolates wastes for a minimum of 1000 years by limiting water drainage to near-zero amounts. Asphalt is being used as an impermeable water diversion layer to provide a redundant layer within the overall barrier design. Data on asphalt barrier properties in a buried environment are not available for the required 100-year time frame. The purpose of this test plan is to outline the activities planned to obtain data with which to estimate performance of the asphalt layers.

Freeman, H.D.; Romine, R.A.

1994-05-01T23:59:59.000Z

290

Experiences with permanent magnets at the Fermilab recycler ring  

E-Print Network (OSTI)

In order to achieve higher luminosities in Run II a separate antiproton storage ring was built in the Main Injector tunnel. To reduce both construction and operations costs permanent magnets were used. This paper discusses the design criterion and specifications, including temperature dependence, longitudinal uniformity, and adjusting of the higher harmonics of the magnets. The design tolerances for a storage ring are more stringent than for a single pass beam line. The difference between the measured and ideal central field for each magnet was held to better than 0.1%. The temperature stability for all magnets was set to better than 0.01% per degree Celsius. Higher order harmonics relative to the central field were set to less than 0.01%. This was done for all 484 permanent magnet that were built.

Volk, James T

2012-01-01T23:59:59.000Z

291

Renewable Energy Opportunities at the Kanto Installations, Japan  

DOE Green Energy (OSTI)

This document provides an overview of renewable resource development potential at the U.S. Army installations in the Kanto region in Japan, which includes Camp Zama, Yokohama North Dock, Sagamihara Family Housing Area (SFHA), Sagami General Depot, and Akasaka Press Center. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the Huntsville Army Corps of Engineers, and includes the development of a methodology for renewable resource assessment at Army installations located on foreign soil. The methodology is documented in Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations. The site visit to the Kanto installations took place on April 5 and 6, 2010. At the current time, there are some renewable technologies that show economic potential. Because of siting restrictions and the small size of these installations, development of most renewable energy technologies will likely be limited to Camp Zama. Project feasibility is based on installation-specific resource availability and energy costs and projections based on accepted life-cycle cost methods. Development of any renewable energy project will be challenging, as it will require investigation into existing contractual obligations, new contracts that could be developed, the legality of certain partnerships, and available financing avenues, which involves the U.S. Forces Japan (USFJ), the Government of Japan (GOJ), and a number of other parties on both sides. The Army will not be able to implement a project without involvement and approval from the other services and multiple levels of Japanese government. However, implementation of renewable energy projects could be an attractive method for GOJ to reduce greenhouse gas emissions and lower annual utility payments to USFJ. This report recommends projects to pursue and offers approaches to use. The most promising opportunities include waste-to-energy and ground source heat pumps. Solar photovoltaics (PV) may also prove successful. Other resources were found to be insufficient on the Kanto installations.

Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

2010-09-24T23:59:59.000Z

292

Installation guidelines for Solar Heating System, single-family residence at New Castle, Pennsylvania  

DOE Green Energy (OSTI)

The Solar Heating System installer guidelines are provided for each subsystem and includes testing and filling the system. This single-family residential heating system is a solar-assisted, hydronic-to-warm-air system with solar-assisted domestic water heating. It is composed of the following major components: liquid cooled flat plate collectors; water storage tank; passive solar-fired domestic water preheater; electric hot water heater; heat pump with electric backup; solar hot water coil unit; tube-and-shell heat exchanger, three pumps, and associated pipes and valving in an energy transport module; control system; and air-cooled heat purge unit. Information is also provided on the operating procedures, controls, caution requirements, and routine and schedule maintenance. Information consists of written procedures, schematics, detail drawings, pictures and manufacturer's component data.

Not Available

1980-01-01T23:59:59.000Z

293

Permanent magnet machine with windings having strand transposition  

DOE Patents (OSTI)

This document discusses, among other things, a stator with transposition between the windings or coils. The coils are free from transposition to increase the fill factor of the stator slots. The transposition at the end connections between an inner coil and an outer coil provide transposition to reduce circulating current loss. The increased fill factor reduces further current losses. Such a stator is used in a dual rotor, permanent magnet machine, for example, in a compressor pump, wind turbine gearbox, wind turbine rotor.

Qu, Ronghai (Clifton Park, NY); Jansen, Patrick Lee (Scotia, NY)

2009-04-21T23:59:59.000Z

294

Summary of radiation damage studies on rare earth permanent magnets  

SciTech Connect

With the proposed use of permanent magnets for both the NLC and the VLHC the issue flux loss due to radiation damage needs to be fully understood. There exist many papers on the subject. There are many difficulties in drawing conclusions from all of these data. First there is the difference methods of dosimetry, second different types of magnets and magnetic arrangements, and third different manufacturers of magnet material. This paper provides a summary of the existing literature on the subject.

J. T. Volk

2002-11-19T23:59:59.000Z

295

Permanent split capacitor single phase electric motor system  

DOE Patents (OSTI)

A permanent split capacitor single phase electric motor achieves balanced operation at more than one operating point by adjusting the voltage supplied to the main and auxiliary windings and adjusting the capacitance in the auxiliary winding circuit. An intermediate voltage tap on an autotransformer supplies voltage to the main winding for low speed operation while a capacitive voltage divider is used to adjust the voltage supplied to the auxiliary winding for low speed operation. 4 figs.

Kirschbaum, H.S.

1984-08-14T23:59:59.000Z

296

Metric Units  

Science Conference Proceedings (OSTI)

... A, B, C, D, E, F, G, H, I, J. 1, Steam Point Calculator: Metric Units, Elevation Converter, ... 6, Height of steam point apparatus above ground (m), 0, m, ...

2011-12-22T23:59:59.000Z

297

United States  

Office of Legacy Management (LM)

- I - I United States Department of Energy D lSCk Al M E R "This book was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency

298

High Temperature, Buried Permanent Magnet, Brushless DC Motor  

E-Print Network (OSTI)

A high temperature magnetic bearing system using high temperature permanent magnets from Electron Energy Corporation (EEC) is under development. The system consists of two radial bearings, one thrust bearing, two radial catcher bearings and one motor. The purpose of this research is to develop one of the critical components of the system, namely, the High Temperature Permanent Magnet motor. A novel High Temperature Permanent Magnet (HTPM) Brushless DC(BLDC) motor capable of operating at 1000 degrees F (538 degrees C) is designed. HTPMs developed at Electron Energy Corporation are buried into the rotor. The high temperature motor is designed to produce 5.1kw of power at a top running speed of 20000 rpm. The numerical values of the motor voltage, power and torque output are predicted from calculations of the nonlinear finite element model of the motor. The motor stator is wound, potted, cured and high potential tested at 1000 degrees F. A servo amplifier from Advanced Motion Control is used to drive the high temperature motor. High temperature displacement sensors are set up for sensing the rotor position to form a closed loop motion control. However, the noise problem of the high temperature sensors causes a failure of this approach. An open loop approach is then developed and this approach succeeds in spinning the rotor with the capability of self-starting. The status of the full system assembling is introduced. Some other components of the system are briefly presented.

Zhang, Zhengxin

2010-08-01T23:59:59.000Z

299

Control system for an interior permanent magnet synchronous machine  

DOE Patents (OSTI)

A high performance, fully operational, four-quadrant control scheme is used in an interior permanent magnet synchronous machine. The machine operates smoothly with full performance in the constant-torque region as well as in the flux-weakening, constant-power region in both directions of motion. The transition between the constant-torque and constant-power regions is very smooth under all conditions of operation. Control in the constant-torque region is based on a vector or field-oriented technique, with the direct-axis aligned with the total stator flux, whereas constant-power region control is accomplished by orientation of the torque angle of the impressed square-wave voltage through the feedforward vector rotator. In a preferred embodiment, the control system employs a digital distributed microcomputer controller arrangement which relies upon various precisely estimated feedback signals, such as torque, flux, etc. The control scheme includes an outer torque control loop primarily for traction type applications, but also contemplates speed and position control loops for various industrial drives. A 70 hp drive system using a Neodymium-Iron-Boron permanent magnet machine and transistor pulse width modulating inverter has been designed and successfully tested. This control scheme also has application in controlling surface permanent magnet machines. 16 figs.

Bose, B.K.

1988-10-12T23:59:59.000Z

300

A Self-Learning Solution for Torque Ripple Reduction for Non-Sinusoidal Permanent Magnet  

E-Print Network (OSTI)

1 A Self-Learning Solution for Torque Ripple Reduction for Non-Sinusoidal Permanent Magnet Motor in a permanent-magnet non-sinusoidal synchronous motor. Solutions for calculating optimal currents are deduced are shown to confirm the validity of the proposed neural approach. Index Terms--Permanent Magnet Synchronous

Paris-Sud XI, Université de

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Direct Torque Control for Interior Permanent Magnet Synchronous Motors with Respect to Optimal Efficiency  

E-Print Network (OSTI)

Direct Torque Control for Interior Permanent Magnet Synchronous Motors with Respect to Optimal@lea.upb.de, boecker@lea.upb.de URL: http://wwwlea.upb.de Keywords «Interior permanent magnet synchronous motor to their high torque and power per volume ratio, interior permanent magnet synchronous motors (IPMSM

Noé, Reinhold

302

Model Predictive Control of a Permanent Magnet Synchronous Motor with Experimental Validation  

E-Print Network (OSTI)

Model Predictive Control of a Permanent Magnet Synchronous Motor with Experimental Validation Shan to regulate the speed of a permanent magnet synchronous motor where the design is based on a linearized state rejection, constraints, quadratic programming. 1. Introduction Permanent Magnet Synchronous Motors (PMSMs

303

A Precise Open-Loop Torque Control for an Interior Permanent Magnet Synchronous Motor  

E-Print Network (OSTI)

A Precise Open-Loop Torque Control for an Interior Permanent Magnet Synchronous Motor (IPMSM@lea.upb.de Abstract-Interior permanent magnet synchronous motors (IPMSM) are preferentially chosen as traction drives. INTRODUCTION Interior permanent magnet synchronous motors (IPMSM) provide high power and torque densities

Noé, Reinhold

304

New England Breeze Solar and Wind Installers | Open Energy Information  

Open Energy Info (EERE)

Breeze Solar and Wind Installers Breeze Solar and Wind Installers Jump to: navigation, search Logo: New England Breeze Solar and Wind Installers Name New England Breeze Solar and Wind Installers Place Hudson, Massachusetts Zip 01749 Sector Renewable energy, Services, Solar, Wind energy Product Solar Panel and Wind Turbine Installation Year founded 2006 Number of employees 1-10 Phone number 978-567-9463 Website http://www.NewEnglandBreeze.co Coordinates 42.3917598°, -71.5661769° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.3917598,"lon":-71.5661769,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

305

Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations  

DOE Green Energy (OSTI)

Since 2005, Pacific Northwest National Laboratory (PNNL) has been asked by Installation Management Command (IMCOM) to conduct strategic assessments at selected US Army installations of the potential use of renewable energy resources, including solar, wind, geothermal, biomass, waste, and ground source heat pumps (GSHPs). IMCOM has the same economic, security, and legal drivers to develop alternative, renewable energy resources overseas as it has for installations located in the US. The approach for continental US (CONUS) studies has been to use known, US-based renewable resource characterizations and information sources coupled with local, site-specific sources and interviews. However, the extent to which this sort of data might be available for outside the continental US (OCONUS) sites was unknown. An assessment at Camp Zama, Japan was completed as a trial to test the applicability of the CONUS methodology at OCONUS installations. It was found that, with some help from Camp Zama personnel in translating and locating a few Japanese sources, there was relatively little difficulty in finding sources that should provide a solid basis for conducting an assessment of comparable depth to those conducted for US installations. Project implementation will likely be more of a challenge, but the feasibility analysis will be able to use the same basic steps, with some adjusted inputs, as PNNLs established renewable resource assessment methodology.

Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

2010-08-30T23:59:59.000Z

306

Reducing the cost of top-drive installation  

Science Conference Proceedings (OSTI)

To equip an older jackup, the Offshore Mercury, with a completely workable and reliable top drive at minimum cost and without sacrificing performance, Sonat Offshore Drilling installed a power-swivel drilling system that did not require heightening or strengthening the derrick. An electronic crown protection system was installed to allow the driller use of all available reduced crown clearance, thereby increasing drilling safety by reducing the probability of accidentally running the traveling block into the crown. In addition, they modified the DC-DC drilling power equipment to create a completely functional and low-cost alternative to installing additional AC power-generating capacity and an SCR system. When planning a cost-effective top-drive installation on the Offshore Mercury, they recognized that the rig did not fit the average jackup profile: It has a DC-DC electric power drilling system and only a 140-ft (43-m) derrick, rather than the more common SCR system and 147-ft (45-m) derrick. From costs studies made up to the middle of 1991, they believed they could save a significant amount if it were possible to install and use a top drive in a 147-ft (45-m) or even a 140-ft (43-m) derrick without having to extend and strengthen the derrick. This paper reviews the design of this system and the effectiveness of its performance.

Hock, C.J. (Sonat Offshore Drilling Inc., Houston, TX (United States))

1993-09-01T23:59:59.000Z

307

High-Energy Composite Permanent Magnets: High-Energy Permanent Magnets for Hybrid Vehicles and Alternative Energy  

SciTech Connect

Broad Funding Opportunity Announcement Project: The University of Delaware is developing permanent magnets that contain less rare earth material and produce twice the energy of the strongest rare earth magnets currently available. The University of Delaware is creating these magnets by mixing existing permanent magnet materials with those that are more abundant, like iron. Both materials are first prepared in the form of nanoparticles via techniques ranging from wet chemistry to ball milling. After that, the nanoparticles must be assembled in a 3-D array and consolidated at low temperatures to form a magnet. With small size particles and good contact between these two materials, the best qualities of each allow for the development of exceptionally strong composite magnets.

None

2010-02-15T23:59:59.000Z

308

NSTAR (Electric) - Small Business Direct Install Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NSTAR (Electric) - Small Business Direct Install Program NSTAR (Electric) - Small Business Direct Install Program NSTAR (Electric) - Small Business Direct Install Program < Back Eligibility Commercial Local Government Nonprofit State Government Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Other Home Weatherization Commercial Weatherization Sealing Your Home Ventilation Manufacturing Heat Pumps Appliances & Electronics Commercial Lighting Lighting Program Info State Massachusetts Program Type Utility Rebate Program Rebate Amount Up to 70% of the total project cost Provider NSTAR The NSTAR Small Business Solutions Program offers incentives for business customers whose average monthly demand is 300 kW or less. The first step of the program is a free energy audit to identify potential energy saving

309

Ohio Town Installing 'Green' Traffic Signals | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ohio Town Installing 'Green' Traffic Signals Ohio Town Installing 'Green' Traffic Signals Ohio Town Installing 'Green' Traffic Signals January 20, 2010 - 3:57pm Addthis Elyria, Ohio, is getting a little greener. Mayor William M. Grace recently confirmed that staff will replace traditional traffic lights with 288 energy-efficient LEDs (light-emitting diodes), saving the town energy and money. "We are definitely doing this, we are going to switch out all the traffic lights in town," Elyria's mayor says. Replacing light bulbs with LEDs will mean substantial savings. That's because these small, solid bulbs can last up to 10 times longer than traditional lights and require considerably less energy. "This gives us the opportunity to change, we expect to realize considerable savings," the mayor says.

310

Installing a Light Source 'Racetrack' | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing a Light Source 'Racetrack' Installing a Light Source 'Racetrack' Installing a Light Source 'Racetrack' March 22, 2011 - 10:42am Addthis Brookhaven National Lab's NSLS II Construction Site | Photo Courtesy of Brookhaven National Lab Brookhaven National Lab's NSLS II Construction Site | Photo Courtesy of Brookhaven National Lab Kendra Snyder This month, workers at Brookhaven National Laboratory's National Synchrotron Light Source II (NSLS-II), the half-mile electron racetrack for one of the world's most advanced light sources, will begin filling the facility's steel and concrete shell. In 2015, NSLS-II will open its doors - and its ultra-bright beams of x-ray, infrared and ultraviolet light - to thousands of researchers around the world, enabling the detailed exploration of everything from

311

Install renewable energy systems | ENERGY STAR Buildings & Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

Install renewable energy systems Install renewable energy systems Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In this section Learn the benefits Get started Use Portfolio Manager Save energy Stamp out energy waste Find cost-effective investments Engage occupants Purchase energy-saving products Put computers to sleep Get help from an expert Take a comprehensive approach Install renewable energy systems

312

Pasadena Water and Power - Solar Power Installation Rebate | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pasadena Water and Power - Solar Power Installation Rebate Pasadena Water and Power - Solar Power Installation Rebate Pasadena Water and Power - Solar Power Installation Rebate < Back Eligibility Commercial Institutional Local Government Nonprofit Residential State Government Savings Category Solar Buying & Making Electricity Program Info State California Program Type Utility Rebate Program Rebate Amount Systems up to 30 kW have the option of receiving an expected performance based buydown (EPBB) or a performance based incentive (PBI). Systems larger than 30 kW are only eligible for the PBI. EPBB (effective 6/1/12): Residential: $1.40/watt AC Commercial and all PPAs: $0.85/watt AC Non-profits and Government: $1.60/watt AC Income-qualified residential: $4.00/watt PBI (effective 6/1/12): Residential: $0.212/kWh Commercial and all PPAs: $0.129/kWh

313

Installing and Operating an Efficient Swimming Pool Pump | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing and Operating an Efficient Swimming Pool Pump Installing and Operating an Efficient Swimming Pool Pump Installing and Operating an Efficient Swimming Pool Pump May 29, 2012 - 7:54pm Addthis Photo courtesy iStockphoto.com Photo courtesy iStockphoto.com What does this mean for me? Use the smallest size pump possible for your swimming pool. Reduce the time your pool pump operates to save money while still keeping your pool clean. You can save energy and maintain a comfortable swimming pool temperature by using a smaller, higher efficiency pump and by operating it less. In a study of 120 pools by the Center for Energy Conservation at Florida Atlantic University, some pool owners saved as much as 75% of their original pumping bill when they used these energy conservation measures (see table below). Table 1. Savings from Pump Conservation Measures

314

Installing a Light Source 'Racetrack' | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing a Light Source 'Racetrack' Installing a Light Source 'Racetrack' Installing a Light Source 'Racetrack' March 22, 2011 - 10:42am Addthis Brookhaven National Lab's NSLS II Construction Site | Photo Courtesy of Brookhaven National Lab Brookhaven National Lab's NSLS II Construction Site | Photo Courtesy of Brookhaven National Lab Kendra Snyder This month, workers at Brookhaven National Laboratory's National Synchrotron Light Source II (NSLS-II), the half-mile electron racetrack for one of the world's most advanced light sources, will begin filling the facility's steel and concrete shell. In 2015, NSLS-II will open its doors - and its ultra-bright beams of x-ray, infrared and ultraviolet light - to thousands of researchers around the world, enabling the detailed exploration of everything from

315

Nevada manufacturer installing geothermal power plant | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nevada manufacturer installing geothermal power plant Nevada manufacturer installing geothermal power plant Nevada manufacturer installing geothermal power plant August 26, 2010 - 4:45pm Addthis Chemetall extracts lithium carbonate, a powder, from brine, a salty solution from within the earth. | Photo courtesy Chemetall Chemetall extracts lithium carbonate, a powder, from brine, a salty solution from within the earth. | Photo courtesy Chemetall Joshua DeLung Chemetall supplies materials for lithium-ion batteries for electric vehicles $28.4 million in Recovery Act funding going toward geothermal plant Plant expected to produce 4 MW of electrical power, employ 25 full-time workers Chemetall produces lithium carbonate to customers in a wide range of industries, including for batteries used in electric vehicles, and now the

316

Y-12 to Install New Fence to Reduce Trespassing | Y-12 National...  

NLE Websites -- All DOE Office Websites (Extended Search)

to Install New Fence ... Y-12 to Install New Fence to Reduce Trespassing Posted: April 23, 2013 - 3:56pm New fence to be installed by April 4 The National Nuclear Security...

317

Safety aspects of small solar installations. A bibliography  

SciTech Connect

Solar energy is viewed by many as a very economical alternative to fossil fuel and/or nuclear energy, and considerable developmental work has been undertaken aimed toward harnessing solar energy for heating and air conditioning of buildings, especially residences. However, little attention has been paid to the safety and environmental aspects of solar installations. Some of the health, safety, and environmental hazards which have been identified as being inherent in small solar heating and cooling systems are summerized. The bibliography lists 24 documents that deal with the installation of small solar-heating and air-conditioniong systems, especially for single-family residences.

James, A.H. Jr.

1977-09-14T23:59:59.000Z

318

Power-installed streetlight foundations lower substation construction costs  

SciTech Connect

The Alabama Power Company's power-installed streetlight foundation (SLF) saves 85% of labor costs and is practical as well as economical. After several foundation designs were tried, the multi-helix proved best for swampy terrain. A test of substation structure support began with soil testing to locate any rock on the site. Standard tubular-steel structures with modified baseplates were used. A truck-mounted derrick proved better for installation than a drill rig. Slight corrosive currents are not expected to cause appreciable deterioration to the foundation. (DCK)

Beason, D.

1981-07-01T23:59:59.000Z

319

Solar system installation at Louisville, Kentucky (final report)  

DOE Green Energy (OSTI)

A contract was awarded in June 1976 for the installation of a solar space heating and domestic hot water system at 2400 Watteroon Trail, Louisville, Kentucky. The overall philosophy used was to install both a liquid and a hot air system retrofitted to the existing office and combined warehouse building. The 1080 sq ft office space is heated first and excess heat is dumped into the warehouse. The two systems offered a unique opportunity to measure the performance and compare results of both air and liquid at one site. The two systems are described in detail and information on the data acquisition system is included.

Not Available

1978-08-07T23:59:59.000Z

320

Installation system for integral mounting of thermal or photovoltaic panels  

Science Conference Proceedings (OSTI)

A unique installation system for mounting solar thermal or photovoltaic solar collector panels as an integral part of a structure is described. The most common example would have the collector array replacing the sheathing and shingles of a roof supported by trusses or rafters on 24 inch centers. The design achieves the goals of a good integral installation which is reliably weathertight, rapid and easy to execute by typical construction workers with little specific extra training and no special tools. All materials and components are commercially available and have proven performance.

Rost, D.F. (Solar Energy Engineering, Poland, OH); Ameduri, G.; Groves, L.

1981-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BP Energy Company BP Energy Company OE Docket No. EA- 3 14 Order Authorizing Electricity Exports to Mexico Order No. EA-3 14 February 22,2007 BP Energy Company Order No. EA-314 I. BACKGROUND Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(Q of the Department of Energy Organization Act (42 U.S.C. 7 15 l(b), 7172(f)) and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C.S24a(e)) . On May 22,2006, BP Energy Company (BP Energy) applied to DOE for an authorization to transmit electric energy from the United States to Mexico as a power marketer. BP Energy proposes to purchase surplus electric energy from electric utilities and other suppliers within the United States and to export that energy to ~Mexico. The cnergy

322

United States  

Office of Legacy Management (LM)

Office of Research and EPA 600/R-941209 Environmental Protection Development January 1993 Agency Washington, DC 20460 Offsite Environmental 57,,7 Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1992 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY OFFICE OF RESEARCH AND DEVELOPMENT ENVIRONMENTAL MONITORING SYSTEMS LABORATORY-LAS VEGAS P.O. BOX 93478 LAS VEGAS. NEVADA 891 93-3478 702/798-2100 Dear Reader: Since 1954, the U.S. Environmental Protection Agency (EPA) and its predecessor the U.S, Public Health Service (PHs) has conducted radiological monitoring in the offsite areas around United States nuclear test areas. The primary objective of this monitoring has been the protection of the health and safety of

323

Kansas refinery starts up coke gasification unit  

SciTech Connect

Texaco Refining and Marketing Inc. has started up a gasification unit at its El Dorado, Kan., refinery. The unit gasifies delayed coke and other refinery waste products. This is the first refinery to install a coke-fueled gasification unit for power generation. Start-up of the $80-million gasification-based power plant was completed in mid-June. The gasifier produces syngas which, along with natural gas, fuels a combustion turbine. The turbine produces virtually 100% of the refinery`s electricity needs and enough heat to generate 40% of its steam requirements.

Rhodes, A.K.

1996-08-05T23:59:59.000Z

324

Brushed permanent magnet DC MLC motor operation in an external magnetic field  

SciTech Connect

Purpose: Linac-MR systems for real-time image-guided radiotherapy will utilize the multileaf collimators (MLCs) to perform conformal radiotherapy and tumor tracking. The MLCs would be exposed to the external fringe magnetic fields of the linac-MR hybrid systems. Therefore, an experimental investigation of the effect of an external magnetic field on the brushed permanent magnet DC motors used in some MLC systems was performed. Methods: The changes in motor speed and current were measured for varying external magnetic field strengths up to 2000 G generated by an EEV electromagnet. These changes in motor characteristics were measured for three orientations of the motor in the external magnetic field, mimicking changes in motor orientations due to installation and/or collimator rotations. In addition, the functionality of the associated magnetic motor encoder was tested. The tested motors are used with the Varian 120 leaf Millennium MLC (Maxon Motor half leaf and full leaf motors) and the Varian 52 leaf MKII MLC (MicroMo Electronics leaf motor) including a carriage motor (MicroMo Electronics). Results: In most cases, the magnetic encoder of the motors failed prior to any damage to the gearbox or the permanent magnet motor itself. This sets an upper limit of the external magnetic field strength on the motor function. The measured limits of the external magnetic fields were found to vary by the motor type. The leaf motor used with a Varian 52 leaf MKII MLC system tolerated up to 450{+-}10 G. The carriage motor tolerated up to 2000{+-}10 G field. The motors used with the Varian 120 leaf Millennium MLC system were found to tolerate a maximum of 600{+-}10 G. Conclusions: The current Varian MLC system motors can be used for real-time image-guided radiotherapy coupled to a linac-MR system, provided the fringe magnetic fields at their locations are below the determined tolerance levels. With the fringe magnetic fields of linac-MR systems expected to be larger than the tolerance levels determined, some form of magnetic shielding would be required.

Yun, J.; St Aubin, J.; Rathee, S.; Fallone, B. G. [Department of Physics, University of Alberta, 11322-89 Avenue, Edmonton, Alberta T6G 2G7 (Canada) and Department of Oncology, Medical Physics Division, University of Alberta, 11560 University Avenue, Edmonton, Alberta T6G 1Z2 (Canada); Department of Medical Physics, Cross Cancer Institute, 11560 University Avenue, Edmonton, Alberta T6G 1Z2 (Canada) and Department of Oncology, Medical Physics Division, University of Alberta, 11560 University Avenue, Edmonton, Alberta T6G 1Z2 (Canada); Department of Physics, University of Alberta, 11322-89 Avenue, Edmonton, Alberta T6G 2G7 (Canada); Department of Medical Physics, Cross Cancer Institute, 11560 University Avenue, Edmonton, Alberta T6G 1Z2 (Canada) and Department of Oncology, Medical Physics Division, University of Alberta, 11560 University Avenue, Edmonton, Alberta T6G 1Z2 (Canada)

2010-05-15T23:59:59.000Z

325

Pages that link to "New England Breeze Solar and Wind Installers...  

Open Energy Info (EERE)

this page on Facebook icon Twitter icon Pages that link to "New England Breeze Solar and Wind Installers" New England Breeze Solar and Wind Installers Jump to:...

326

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network (OSTI)

Prices. . . . . 14 Installed Project Costs Are On the Rise,of Decline. . 15 Project Cost Increases Are a Function ofin installed wind project costs, wind turbine transaction

2008-01-01T23:59:59.000Z

327

Permits to Install,New Source Review (PTI,NSR) (Michigan) |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Permits to Install,New Source Review (PTI,NSR) (Michigan) Permits to Install,New Source Review (PTI,NSR) (Michigan) Eligibility Utility Fed. Government Commercial Agricultural...

328

Preliminary assessment report for Florence Military Reservation, Installation 04080, Florence, Arizona. Installation Restoration Program  

SciTech Connect

This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Arizona Army National Guard property near Florence, Arizona. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. Florence Military Reservation is a 5,655-acre site located in the southern portion of Arizona, about 65 mi southeast of Phoenix, in the county of Pinal. Florence Military Reservation includes Unit Training Equipment Site (UTES) 1, an artillery firing range, and ammunition storage. The subject of this PA is the UTES. The environmentally significant operations associated with the UTES property are (1) vehicle maintenance and refueling, (2) supply/storage of materials, and (3) the vehicle washrack.

Not Available

1993-08-01T23:59:59.000Z

329

Device for regulating radiant flux in solar installations  

SciTech Connect

Devices for regulating luminous flux in solar installations that concentrate solar radiation are considered. Shutter-type luminous-flux regulators located on heliostats are considered, as well as devices that permit automatic variation in orientation of each concentrator facet in accordance with the prescribed program. The advantages and drawbacks of the devices described are cited.

Khakimov, R.A.; Zakhidov, R.A.; Sizov, Yu.M.

1980-01-01T23:59:59.000Z

330

STATE OF CALIFORNIA QUALITY INSULATION INSTALLATION FRAMING STAGE CHECKLIST  

E-Print Network (OSTI)

be accepted by the building department or HERS rater. SPF insulation can be considered an air barrier when be insulated. These areas shall be called out on the building plans with diagrams and/or specific designSTATE OF CALIFORNIA QUALITY INSULATION INSTALLATION ­ FRAMING STAGE CHECKLIST CEC-CF-4R-ENV-21

331

Installation and assembly device and method of using  

DOE Patents (OSTI)

The present invention relates to an installation and assembly device and method for facilitating the fitup of mating components during blind or remote installation and assembly, especially where close fitup tolerances are involved. The present invention is particularly useful for the purpose of facilitating vertical and/or radial relative positioning of a pump impeller within a mating inlet nozzle during a blind assembly wherein actual fitup cannot be observed during installation. The information within identifies just one successful application of the installation and assembly alignment device for a pump. The device, however, is not solely limited to pump assembly but can be used in other cases where fitup of a sleeve inside a mating bore is required under conditions of close tolerance during a blind or remote assembly. The device is likewise not limited to circular configurations but can be used for many other shapes or configurations. Any material that can be machined and hold reasonably close tolerances can be used for the device. Also, because the sleeve position is adjusted by set screws or bolts, the concentricity can be radially biased, if required, to achieve particular alignment conditions.

Kolsun, G.J.

1995-12-31T23:59:59.000Z

332

Permanent magnet assisted synchronous reluctance motor, design and performance improvement  

E-Print Network (OSTI)

Recently, permanent magnet assisted (PMa)-synchronous reluctance motors (SynRM) have been considered as a possible alternative motor drive for high performance applications. In order to have an efficient motor drive, performing of three steps in design of the overall drive is not avoidable. These steps are design optimization of the motor, identification of the motor parameter and implementation of an advanced control system to ensure optimum operation. Therefore, this dissertation first deals with the design optimization of the Permanent Magnet Assisted Synchronous Reluctance Motor (PMa-SynRM). Various key points in the rotor design of a low cost PMa-SynRM are introduced and their effects are studied. Finite element approach has been utilized to show the effects of these parameters on the developed average electromagnetic torque and the total d-q inductances. As it can be inferred from the name of the motor, there are some permanent magnets mounted in the rotor core. One of the features considered in the design of this motor is the magnetization of the permanent magnets mounted in the rotor core using the stator windings to reduce the manufacturing cost. At the next step, identification of the motor parameters is discussed. Variation of motor parameters due to temperature and airgap flux has been reported in the literatures. Use of off-line models for estimating the motor parameters is known as a computationally intensive method, especially when the models include the effect of cross saturation. Therefore in practical applications, on-line parameter estimation is favored to achieve a high performance control system. In this dissertation, a simple practical method for parameter estimation of the PMa-SynRM is introduced. Last part of the dissertation presents one advanced control strategy which utilized the introduced parameter estimator. A practical Maximum Torque Per Ampere (MTPA) control scheme along with a simple parameter estimator for PMa-SynRM is introduced. This method is capable of maintaining the MTPA condition and stays robust against the variations of motor parameters. Effectiveness of the motor design procedure and the control strategy is validated by presenting simulation and experimental results of a 1.5 kW prototype PMa-SynRM, designed and manufactured through the introduced design method.

Niazi, Peyman

2005-12-01T23:59:59.000Z

333

Evaluation of Trenchless Installation Technology for Radioactive Wastewater Piping Applications  

SciTech Connect

The U.S. Department of Energy (DOE) Office of Environmental Management (EM) cleanup mission at Oak Ridge National Laboratory (ORNL) includes dispositioning facilities, contaminated legacy materials/waste, and contamination sources and remediation of soil under facilities, groundwater, and surface water to support final Records of Decision (RODs). The Integrated Facilities Disposition Project (IFDP) is a roughly $15B project for completion of the EM mission at Oak Ridge, with a project duration of up to 35 years. The IFDP Mission Need Statement - Critical Decision-0 (CD-0) - was approved by DOE in July 2007, and the IFDP Alternative Selection and Cost Range - Critical Decision-1 (CD-1) - was approved in November 2008. The IFDP scope includes reconfiguration of waste collection and treatment systems as needed to complete the IFDP remediation and decontamination and decommissioning (D&D) missions in a safe and cost-effective manner while maintaining compliance with all governing regulations and bodies and preserving the support of continuing operations at ORNL. A step in the CD-1 approval process included an external technical review (ETR) of technical approaches proposed in the CD-1 document related to the facility reconfiguration for the ORNL radioactive waste and liquid low-level waste management systems. The ETR team recommended that the IFDP team consider the use of trenchless technologies for installing pipelines underground in and around contaminated sites as part of the alternatives evaluations required in support of the CD-2 process. The team specifically recommended evaluating trenchless technologies for installing new pipes in existing underground pipelines as an alternative to conventional open trench installation methods. Potential benefits could include reduction in project costs, less costly underground piping, fewer disruptions of ongoing and surface activities, and lower risk for workers. While trenchless technologies have been used extensively in the sanitary sewer and natural gas pipeline industries, they have been used far less in contaminated environments. Although trenchless technologies have been used at ORNL in limited applications to install new potable water and gas lines, the technologies have not been used in radioactive applications. This study evaluates the technical risks, benefits, and economics for installing gravity drained and pressurized piping using trenchless technologies compared to conventional installation methods for radioactive applications under ORNL geological conditions. A range of trenchless installation technologies was reviewed for this report for general applicability for replacing existing contaminated piping and/or installing new pipelines in potentially contaminated areas. Installation methods that were determined to have potential for use in typical ORNL contaminated environments were then evaluated in more detail for three specific ORNL applications. Each feasible alternative was evaluated against the baseline conventional open trench installation method using weighted criteria in the areas of environment, safety, and health (ES&H); project cost and schedule; and technical operability. The formulation of alternatives for evaluation, the development of selection criteria, and the scoring of alternatives were performed by ORNL staff with input from vendors and consultants. A description of the evaluation methodology and the evaluation results are documented in the following sections of this report.

Robinson, Sharon M [ORNL; Jubin, Robert Thomas [ORNL; Patton, Bradley D [ORNL; Sullivan, Nicholas M [ORNL; Bugbee, Kathy P [ORNL

2009-09-01T23:59:59.000Z

334

Electricity production and cooling energy savings from installation of a  

NLE Websites -- All DOE Office Websites (Extended Search)

production and cooling energy savings from installation of a production and cooling energy savings from installation of a building-integrated photovoltaic roof on an office building Title Electricity production and cooling energy savings from installation of a building-integrated photovoltaic roof on an office building Publication Type Journal Article Year of Publication 2013 Authors Ban-Weiss, George, Craig P. Wray, William W. Delp, Peter Ly, Hashem Akbari, and Ronnen M. Levinson Journal Energy and Buildings Volume 56 Pagination 210 - 220 ISSN 0378-7788 Keywords Advanced Technology Demonstration, building design, Building heat transfer, cool roof, energy efficiency, Energy Performance of Buildings, energy savings, Energy Usage, energy use, Heat Island Abstract Reflective roofs can reduce demand for air conditioning and warming of the atmosphere. Roofs can also host photovoltaic (PV) modules that convert sunlight to electricity. In this study we assess the effects of installing a building integrated photovoltaic (BIPV) roof on an office building in Yuma, AZ. The system consists of thin film PV laminated to a white membrane, which lies above a layer of insulation. The solar absorptance of the roof decreased to 0.38 from 0.75 after installation of the BIPV, lowering summertime daily mean roof upper surface temperatures by about 5 °C. Summertime daily heat influx through the roof deck fell to ±0.1 kWh/m2from 0.3-1.0 kWh/m2. However, summertime daily heat flux from the ventilated attic into the conditioned space was minimally affected by the BIPV, suggesting that the roof was decoupled from the conditioned space. Daily PV energy production was about 25% of building electrical energy use in the summer. For this building the primary benefit of the BIPV appeared to be its capacity to generate electricity and not its ability to reduce heat flows into the building. Building energy simulations were used to estimate the cooling energy savings and heating energy penalties for more typical buildings.

335

FORSCOM installation characterization and ranking for water efficiency improvement  

SciTech Connect

On March 11, 1994, President Clinton signed Executive Order 12902-Energy Efficiency and Water Conservation at Federal Facilities. Section 302 of the Executive Order calls for energy and water prioritization surveys of federal facilities to be conducted. The surveys will be used to establish priorities for conducting comprehensive facility audits. In response to the requirements of the Executive Order, the U.S. Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) to initiate a broad study of the water savings potential at each of its major installations. This report provides an assessment of the water, sewer, energy (for hot water production and pumping), and associated cost savings potential at ten of the major FORSCOM installations. This assessment is meant to be a {open_quotes}first pass{close_quotes} estimate of the water savings potential, to assist FORSCOM in prioritizing installations for detailed water audits and potential water efficient retrofits. In addition, the end uses (toilets, sinks, showerheads, irrigation, etc.) with the greatest water savings potential are identified at each installation. This report is organized in the following manner. Following this Introduction, Section 2 provides important background information pertaining to the water analysis. Section 3 describes the methodology employed in the analysis, and Section 4 summarizes the study results. Section 5 prioritizes the installations based on both water/sewer savings and cost associated with water, sewer, and energy savings. Section 6 provides recommendations on where to start detailed water audits, as well as other recommendations. References are listed in Section 7. The appendices provide specific information on the analysis results and methodology, along with a discussion of special issues.

Fitzpatrick, Q.K.; McMordie, K.L.; Di Massa, F.V. [and others

1995-05-01T23:59:59.000Z

336

SOLERAS - Solar Cooling Engineering Field Tests Project: Carrier Corporation. Fabrication, testing and installation report: 53 kW solar absorption cooling system  

DOE Green Energy (OSTI)

A 53 kW water cooled packaged solar absorption chiller was fabricated and tested. The generator shell and absorber shell had sight glasses added as a diagnostic device. The unit was modified so that a base suitable for mounting pumps, valves and associated piping was cantilevered from one end of the unit. The installation and start-up of the cooling system is outlined.

Not Available

1985-01-01T23:59:59.000Z

337

Hanford Permanent Isolation Barrier Program: Asphalt technology development  

SciTech Connect

An important component of the Hanford Permanent Isolation Barrier is the use of a two-layer composite asphalt system, which provides backup water diversion capabilities if the primary capillary barrier fails to meet infiltration goals. Because of asphalt`s potential to perform to specification over the 1000-year design life criterion, a composite asphalt barrier (HMAC/fluid-applied polymer-modified asphalt) is being considered as an alternative to the bentonite clay/high density poly(ethylene) barriers for the low-permeability component of the Hanford Permanent Isolation Barrier. The feasibility of using asphalt as a long-term barrier is currently being studied. Information that must be known is the ability of asphalt to retain desirable physical properties over a period of 1000 years. This paper presents the approach for performing accelerated aging tests and evaluating the performance of samples under accelerated conditions. The results of these tests will be compared with asphalt artifact analogs and the results of modeling the degradation of the selected asphalt composite to make life-cycle predictions.

Freeman, H.D.; Romine, R.A.

1994-11-01T23:59:59.000Z

338

Adjustable permanent quadrupoles for the next linear collider  

Science Conference Proceedings (OSTI)

The proposed Next Linear Collider (NLC) will require over 1400 adjustable quadrupoles between the main linacs' accelerator structures. These 12.7 mm bore quadrupoles will have a range of integrated strength from 0.6 to 138 Tesla, with a maximum gradient of 141 Tesla per meter, an adjustment range of +0 to {minus}20% and effective lengths from 324 mm to 972 mm. The magnetic center must remain stable to within 1 micron during the 20% adjustment. In an effort to reduce costs and increase reliability, several designs using hybrid permanent magnets have been developed. Four different prototypes have been built. All magnets have iron poles and use Samarium Cobalt to provide the magnetic fields. Two use rotating permanent magnetic material to vary the gradient, one uses a sliding shunt to vary the gradient and the fourth uses counter rotating magnets. Preliminary data on gradient strength, temperature stability, and magnetic center position stability are presented. These data are compared to an equivalent electromagnetic prototype.

James T. Volk et al.

2001-06-22T23:59:59.000Z

339

Interior Permanent Magnet Reluctance Machine with Brushless Field Excitation  

SciTech Connect

In a conventional permanent magnet (PM) machine, the air-gap flux produced by the PM is fixed. It is difficult to enhance the air-gap flux density due to limitations of the PM in a series-magnetic circuit. However, the air-gap flux density can be weakened by using power electronic field weakening to the limit of demagnetization of the PMs. This paper presents the test results of controlling the PM air-gap flux density through the use of a stationary brushless excitation coil in a reluctance interior permanent magnet with brushless field excitation (RIPM-BFE) motor. Through the use of this technology the air-gap flux density can be either enhanced or weakened. There is no concern with demagnetizing the PMs during field weakening. The leakage flux of the excitation coil through the PMs is blocked. The prototype motor built on this principle confirms the concept of flux enhancement and weakening through the use of excitation coils.

Wiles, R.H.

2005-10-07T23:59:59.000Z

340

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

E-T Global Energy, LLC E-T Global Energy, LLC OE Docket No. EA-381 Order Authorizing Electricity Exports to Mexico Order No. EA-381 June 10, 2011 I. BACKGROUND E-T Global Energy, LLC Order No. EA-381 Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department ofEnergy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require authorization under section 202(e) ofthe Federal Power Act (FPA) (16 U.S.C.824a(e)) 1 * On May 10,2011, DOE received an application from E-T Global Energy, LLC (E-T Global) for authority to transmit electric energy from the United States to Mexico for five years as a power marketer using existing international transmission facilities. E-

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

United States  

Office of Legacy Management (LM)

WASHINGTON, TUESDAY, JUNE 28, 1983 @nngmeional Ruord United States of America .__ -- . . ,- PROCEEDINGS AND DEBATES OF THE 9@ CONGRESS, FIRST SESSION United States Government Printing Office SUPERINTENDENT OF DOCUMENTS Washmgton, D C 20402 OFFICIAL BUSINESS Penalty Ior pwate use. $xX Congresstonal Record (USPS 087-390) Postage and Fees Pad U S Government Prlnhng 0ffv.X 375 SECOND CLASS NEWSPAPER H.4578 ' C.QNGRESSIONAL RECORD - HOUSE June 28, 1983 H.J. Res. 273: Mr. BOUND. Mr. W~.XMAN. Mr. OBERSTAR, Mr. BEDELL. Mr. BONER of Tennessee, Mr. OWENS. Mr. DAUB, Mr. CONTE. Mr. RAHALL; Mr. GRAY, Mr. VANDER JACT. Mr. TRAKLER, and Mr. Vxrrro. H. Con. Res. 107: Mr. KASICH. Mr. AUCOIN. Mr. CARPER, and Mr. SIZHFIJER. H. Con. Res. 118: Mr. FISH. Mr. LANTOS.

342

United States  

Office of Legacy Management (LM)

ongrees;ional Record ongrees;ional Record United States of America __._ -.. I. :- PROCEEDINGS AND DEBATES OF THE 9tth CONGRESS, FIRST SESSION United States Government Printing Office SUPERINTENDENT OF DOCUMENTS Washmcqton. Cl C 20402 OFFICIAL BUSINESS Penalty Ior pwate use. $300 Congressmal Record (USPS 087-390) Postage and Fees Pad U S Governme3n:jPnntmg OfIce SECOND CLASS NEWSPAPER H.4578 ' June 28, 1983 -: I H.J. Res. 273: Mr. BOLAND, Mr. WA-. Mr. OBERSTAFC, M' r. BEDELL, Mr. BONER of Tennessee, Mr. OWENS. Mr. DAUB. Mr. CONTE. Mr. RAHALL,. Mr. GRAY, Mr. VANDER JAGT. Mr. TRAKLER. and Mr. VENTO. H. Con. Res. iO7: Mr. KASICH. Mr. ALCOIN. Mr. CARPER. and Mr. SCHEUER. H. Con. Res. 118: Mr. FISH, Mr. LANTOS. Mr. KILDEE. Mr. SOLARZ Mr. Bmrr, Mr. BELWLL, Mr. RANG~L, Mr. DYMALLY. Mr.

343

Designing, selecting and installing a residential ground-source heat pump system  

Science Conference Proceedings (OSTI)

It's a compelling proposition: Use the near-constant-temperature heat underground to heat and cool your home and heat domestic water, slashing your energy bills. Yet despite studies demonstrating significant energy savings from ground-source heat pump (GSHP) systems, their adoption has been hindered by high upfront costs. Fewer than 1% of US homes use a GSHP system. However, compared to a minimum-code-compliant conventional space-conditioning system, when properly designed and installed, a GSHP retrofit at current market prices offers simple payback of 4.3 years on national average, considering existing federal tax credits. Most people understand how air-source heat pumps work: they move heat from indoor air to outdoor air when cooling and from outdoor air to indoor air when heating. The ground-source heat pump operates on the same principle, except that it moves heat to or from the ground source instead of outdoor air. The ground source is usually a vertical or horiontal ground heat exchanger. Because the ground usually has a more favorable temperature than ambient air for the heating and cooling operation of the vapor-compression refrigeration cycle, GSHP sysems can operate with much higher energy efficiencies than air-source heat pump systems when properly designed and installed. A GSHP system used in a residual building typically provides space conditioning and hot water and comprises three major components: a water-source heat pump unit designed to operate at a wider range of entering fluid temperatures (typically from 30 F to 110 F, or 1 C to 43 C) than a conventional water-source heat pump unit; a ground heat exchanger (GHX); and distribution systems to deliver hot water to the storage tank and heating or cooling to the conditioned rooms. In most residual GSHP systems, the circulation pumps and associated valves are integrated with the heat pump to circulate the heat-carrier fluid (water or aqueous antifreeze solution) through the heat pump and the GHX. A recent assessment indicates that if 20% of US homes replaced their existing space-conditioning and water-heating systems with properly designed, installed and operated state-of-the-art GSHP systems, it would yield significant benefits each year. These include 0.8 quad British thermal units (Btu) of primary energy savings, 54.3 million metric tons of CO{sub 2} emission reductions, $10.4 billion in energy cost savings and 43.2 gigawatts of reduction in summer peak electrical demand.

Hughes, Patrick [ORNL; Liu, Xiaobing [ORNL; Munk, Jeffrey D [ORNL

2010-01-01T23:59:59.000Z

344

Analysis of Slanted Air-gap Structure of Interior Permanent Magnet Synchronous Motor with Brushless Field Excitation  

E-Print Network (OSTI)

Analysis of Slanted Air-gap Structure of Interior Permanent Magnet Synchronous Motor with Brushless permanent magnet synchronous motor (IPMSM) for application in a hybrid electric vehicle. This unique slanted permanent magnet synchronous motor FEA finite element analysis PM permanent magnet II. INTRODUCTION

Tolbert, Leon M.

345

HEU Transparency Program: Monitoring at the U.S. Permanent Presence Office in Russia  

SciTech Connect

In February 1993, the US and the Russian Federation signed an agreement that allows the US to purchase 500 tonnes of Russian low-enriched uranium (LEU) that has been blended down from the high-enriched uranium (HEU) from Russia's dismantled nuclear weapons. The agreement calls for the HEU to be blended down to LEU at Russian facilities and then shipped to the United states to be used for making commercial reactor fuel. This HEU Agreement was crafted to avoid the rigid verification procedures of previous arms control and nonproliferation treaties. In the United States, it is being implemented by the US Department of Energy (DOE) under the HEU Transparency Program. Transparency refers to agreed-upon measures intended to build confidence that the objectives of the HEU Agreement are being met. The objectives of the HEU Transparency Program are to ensure that (a) the HEU subject to the agreement is extracted from Russian nuclear weapons; (b) this same extracted HEU enters an oxidation facility and is oxidized therein; (c) the declared quantity of HEU is blended down to LEU; and (d) the LEU that is delivered to the United states, pursuant to the agreement, is fabricated into fuel for commercial nuclear reactors. The HEU Agreement gives Russian monitors access to the US Enrichment Corporation's Portsmouth Gaseous Diffusion Plant in Piketon, Ohio, and to the five US fuel fabrication facilities receiving the Russian uranium. In turn, US monitors have access to the four principal Russian plants that convert HEU to LEU. Currently, monitoring at three Russian facilities--the Mayak Production Association near Ozersk, Siberian Chemical Enterprise (SChE) near Tomsk, and Electrochemical Integrated Plant (ECP) near Zelenogorsk--is confined to periodic visits. However, US monitors have continuous access to the Ural Electrochemical Integrated Enterprise (UEIE) in Novouralsk through the US Permanent Presence Office (PPO) located there. This paper summarizes the monitoring activities and challenges involved in managing and coordinating the PPO.

Boggs, C.J.; Monette, F.A.; Hensley, J.E.

1999-07-01T23:59:59.000Z

346

United States National Seismographic Network  

SciTech Connect

The concept of a United States National Seismograph Network (USNSN) dates back nearly 30 years. The idea was revived several times over the decades. but never funded. For, example, a national network was proposed and discussed at great length in the so called Bolt Report (U. S. Earthquake Observatories: Recommendations for a New National Network, National Academy Press, Washington, D.C., 1980, 122 pp). From the beginning, a national network was viewed as augmenting and complementing the relatively dense, predominantly short-period vertical coverage of selected areas provided by the Regional Seismograph Networks (RSN`s) with a sparse, well-distributed network of three-component, observatory quality, permanent stations. The opportunity finally to begin developing a national network arose in 1986 with discussions between the US Geological Survey (USGS) and the Nuclear Regulatory Commission (NRC). Under the agreement signed in 1987, the NRC has provided $5 M in new funding for capital equipment (over the period 1987-1992) and the USGS has provided personnel and facilities to develop. deploy, and operate the network. Because the NRC funding was earmarked for the eastern United States, new USNSN station deployments are mostly east of 105{degree}W longitude while the network in the western United States is mostly made up of cooperating stations (stations meeting USNSN design goals, but deployed and operated by other institutions which provide a logical extension to the USNSN).

Buland, R. [Geological Survey, Denver, CO (United States)

1993-09-01T23:59:59.000Z

347

EA-1655: Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development  

Energy.gov (U.S. Department of Energy (DOE))

Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development

348

Installing NikonView 4 under Windows (COOLPIX5000/995/885/775/990/880) A-1 Installing NikonView 4 underWindows  

E-Print Network (OSTI)

Installing NikonView 4 under Windows (COOLPIX5000/995/885/775/990/880) A-1 Installing NikonView 4 underWindows Installing Nikon View 4 for the COOLPIX5000/995/885/775/990/880 NikonView 4 includes- trator" (Windows 2000 Professional) or "ComputerAdministrator" (Win- dows XP Home Edition/Windows XP

Kleinfeld, David

349

Design Considerations, Installation and Operation of the Two-Stage Parallel Flow Absorption Chiller  

E-Print Network (OSTI)

This presentation describes the actual design consideration and field operation experience of two-stage parallel flow absorption chillers. The applications include new construction, rehabilitation of old HVAC systems, cogeneration, and industrial process heat recovery. The high performance (COP = 1.14), and reduced maintenance cost of the two-stage parallel flow absorption chiller provides a notable improvement over the conventional single stage absorption chillers (COP = .6). The infamous reputation of the single stage absorption chiller for crystallization, poor mechanical performance, and general unreliability has been completely neutralized by new design concepts incorporated in the two-stage parallel flow absorption chiller/heater. The ease of maintenance and virtual elimination of crystallization has vastly improved chilled water production and mechanical longevity. The two-stage parallel flow absorption chiller is adaptable to various heat sources including direct fired multi-fuel, steam, exhaust, hot water, thermal fluids, etc. This makes this chiller a worthy consideration as an alternate to electrically driven refrigeration. The two-stage parallel flow absorption chiller has been operating in the United States since 1979 and there is presently over 24,000 tons of installed capacity online. Installations include office buildings, hospitals, computer centers, industrial process water and others.

Hufford, P. E.

1984-01-01T23:59:59.000Z

350

Pantex installs new high explosives equipment | National Nuclear Security  

NLE Websites -- All DOE Office Websites (Extended Search)

high explosives equipment | National Nuclear Security high explosives equipment | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex installs new high explosives equipment Pantex installs new high explosives equipment Posted By Office of Public Affairs Joel Ramos works with the lathe. Big jobs are nothing new for the Projects Division at Pantex, and the

351

Microsoft Word - Final_NineCanyon_CommunicationTowerInstall_CX  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2013 1, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Kelly Gardner, PMP Project Manager, TEP-TPP-1 Proposed Action: Nine Canyon Substation Communication Tower Addition: 331800 McNary Sub Bus Tie Relay Replacements and 310427 McNary-Badger Canyon Transfer Trip Install Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 - Additions and modifications to transmission facilities Location: Kennewick, Benton County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install a 60-foot communications tower and associated communication equipment at the Benton County Public Utility District's Nine Canyon Substation in Benton County, Washington. The upgrade would involve replacing the

352

Pantex installs new high explosives equipment | National Nuclear Security  

National Nuclear Security Administration (NNSA)

high explosives equipment | National Nuclear Security high explosives equipment | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex installs new high explosives equipment Pantex installs new high explosives equipment Posted By Office of Public Affairs Joel Ramos works with the lathe. Big jobs are nothing new for the Projects Division at Pantex, and the

353

Idaho National Engineering Laboratory installation roadmap document. Revision 1  

SciTech Connect

The roadmapping process was initiated by the US Department of Energy`s office of Environmental Restoration and Waste Management (EM) to improve its Five-Year Plan and budget allocation process. Roadmap documents will provide the technical baseline for this planning process and help EM develop more effective strategies and program plans for achieving its long-term goals. This document is a composite of roadmap assumptions and issues developed for the Idaho National Engineering Laboratory (INEL) by US Department of Energy Idaho Field Office and subcontractor personnel. The installation roadmap discusses activities, issues, and installation commitments that affect waste management and environmental restoration activities at the INEL. The High-Level Waste, Land Disposal Restriction, and Environmental Restoration Roadmaps are also included.

1993-05-30T23:59:59.000Z

354

Advanced natural gas fuel technologies for military installations. Final report  

SciTech Connect

Energy conservation efforts reduced Department of Defense (DoD) fossil fuel consumption considerably between FYX5 and FY9 I, yet electricity consumption increased. Electricity consumption accounts for only one-third of DoD energy use, but over half of DoD energy costs. In addition, the production of electricity at coal or nuclear plants often creates environmental concerns, while the use of clean-burning natural gas does not; its use can help DoD bases comply with increasingly stringent environmental regulations. Recent developments in natural gas-fired technologies also demonstrate improved efficiency and productivity at lower costs. This report identifies state-of-the-art and emerging natural gas utilization technologies with potential application on DoD installations. This report describes various technologies that have potential residential, commercial, or industrial applications on DoD installations. Applications include heating, cooling, power generation, food preparation, and several industrial processes.

Savoie, M.J.; Freeman, P.M.; Blazek, C.F.; Potts, N.L.

1994-09-01T23:59:59.000Z

355

CX-010142: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Install Permanent Power for Saltstone Disposal Unit Construction CX(s) Applied: B4.6 Date: 03062013 Location(s): South Carolina...

356

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008  

DOE Green Energy (OSTI)

Installations of solar photovoltaic (PV) systems have been growing at a rapid pace in recent years. In 2008, 5,948 MW of PV was installed globally, up from 2,826 MW in 2007, and was dominated by grid-connected applications. The United States was the world's third largest PV market in terms of annual capacity additions in 2008, behind Spain and Germany; 335 MW of PV was added in the U.S. in 2008, 293 MW of which came in the form of grid-connected installations. Despite the significant year-on-year growth, however, the share of global and U.S. electricity supply met with PV remains small, and annual PV additions are currently modest in the context of the overall electric system. The market for PV in the U.S. is driven by national, state, and local government incentives, including up-front cash rebates, production-based incentives, requirements that electricity suppliers purchase a certain amount of solar energy, and Federal and state tax benefits. These programs are, in part, motivated by the popular appeal of solar energy, and by the positive attributes of PV - modest environmental impacts, avoidance of fuel price risks, coincidence with peak electrical demand, and the location of PV at the point of use. Given the relatively high cost of PV, however, a key goal of these policies is to encourage cost reductions over time. Therefore, as policy incentives have become more significant and as PV deployment has accelerated, so too has the desire to track the installed cost of PV systems over time, by system characteristics, by system location, and by component. To address this need, Lawrence Berkeley National Laboratory initiated a report series focused on describing trends in the installed cost of grid-connected PV systems in the U.S. The present report, the second in the series, describes installed cost trends from 1998 through 2008. The analysis is based on project-level cost data from more than 52,000 residential and non-residential PV systems in the U.S., all of which are installed at end-use customer facilities (herein referred to as 'customer-sited' systems). The combined capacity of systems in the data sample totals 566 MW, equal to 71% of all grid-connected PV capacity installed in the U.S. through 2008, representing the most comprehensive source of installed PV cost data for the U.S.9 The report also briefly compares recent PV installed costs in the U.S. to those in Germany and Japan. Finally, it should be noted that the analysis presented here focuses on descriptive trends in the underlying data, and is primarily summarized in tabular and graphical form; later analysis may explore some of these trends with more-sophisticated statistical techniques. The report begins with a summary of the data collection methodology and resultant dataset (Section 2). The primary findings of the analysis are presented in Section 3, which describes trends in installed costs prior to receipt of any financial incentives: over time and by system size, component, state, customer segment (residential vs. commercial vs. public-sector vs. non-profit), application (new construction vs. retrofit), and technology type (building-integrated vs. rack-mounted, crystalline silicon vs. thin-film, and tracking vs. rack-mounted). Section 4 presents additional findings related to trends in PV incentive levels over time and among states (focusing specifically on state and utility incentive programs as well as state and Federal tax credits), and trends in the net installed cost paid by system owners after receipt of such incentives. Brief conclusions are offered in the final section.

Barbose, Galen L; Wiser, Ryan; Peterman, Carla; Darghouth, Naim

2009-10-05T23:59:59.000Z

357

Installing micro-hydro in the developing nations  

SciTech Connect

The difficulties encountered in installing a micro-hydroelectric power system in Korupun, a mission station/community located in the highlands of Irian Jaya, Indonesia are discussed. Initial construction resulted in the completion of a diversion structure, a 400 ft. power canal, a settling pond, intake works and a power house foundation. The site itself would use less than minimum stream-flow, a 900 ft. penstock and 150 ft. of net effective head to produce 12 kilowatts of electricity.

Johnson, M.

1986-02-01T23:59:59.000Z

358

Gas main installed under a major four-lane highway  

SciTech Connect

This paper discusses the design and installation of a natural gas pipeline in Richmond, British Columbia. Because of problems with existing utility lines, pressure requirements, safety concerns, socio-economic interests, it was decided that the only alternative was down the center-line of the highway. The paper reviews the geologic site conditions which favored directional drilling operations along with the actual drilling equipment involved. It reviews the problems encountered and how such problems were overcome.

Tremblay, G.R. (BC Gas Utility Ltd., Burnaby, British Columbia (Canada))

1994-06-01T23:59:59.000Z

359

Wind Gains ground, hitting 33 GW of installed capacity  

Science Conference Proceedings (OSTI)

The U.S. currently has 33 GW of installed wind capacity. Wind continues to gain ground, accounting for 42 percent of new capacity additions in the US in 2008.Globally, there are now 146 GW of wind capacity with an impressive and sustained growth trajectory that promises to dominate new generation capacities in many developing countries. The U.S., however, lags many European countries, with wind providing roughly 2 percent of electricity generation.

NONE

2010-06-15T23:59:59.000Z

360

Retrofit Installation of a Residential Photovoltaic Power System  

Science Conference Proceedings (OSTI)

Photovoltaic (PV) systems offer great potential for utility customers to supplement centrally supplied power. However, because these systems are still quite novel, the process of gaining approval for and installing them is unfamiliar and not standardized at most utility companies. Therefore, it can prove sufficiently challenging that it presents a barrier to would-be PV owners. This report looks at that process as it applied to a residential system in Phoenix, Arizona, and proposes ways that the process ...

2003-03-19T23:59:59.000Z

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska  

DOE Green Energy (OSTI)

The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencing similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact.

NONE

1998-05-01T23:59:59.000Z

362

Installation of a fast framing visible camera on KSTAR  

Science Conference Proceedings (OSTI)

Visible camera technologies have made remarkable progress in recent years, and the fast camera has proven itself to be a capable imaging diagnostic in studies of specific fusion plasma issues such as the start-up physics, plasma wall interactions, edge-localized modes, and disruptions. For the purpose of favorable visible imaging, a fast framing camera has recently been installed on the Korea Superconducting Tokamak Advanced Research (KSTAR) device. The camera uses a complementary metal-oxide semiconductor detector with a maximum resolution of 1280x1024 at 1000 frames/s (fps) and a minimum resolution of 1280x16 at 64 kfps. A 2-m-long viewport having a novel optical rail system was installed on a tangential port to view the tokamak interior. The system is fully controlled from the main control room and protected by a shutter from deposits. To verify that the camera electronics are safe from the high magnetic field and its rapid time variation, possible influences are considered theoretically and experimentally. In this work, we present the design and installation of the fast camera system on the KSTAR device with discussions on the field variation effect issues.

Chung, Jinil; Lee, Deok Kyo; Seo, Dongcheol [National Fusion Research Institute, Gwahangno 113, Daejeon 305-333 (Korea, Republic of); Choi, Myoung Choul [Korea Basic Science Institute, 804-1 Ochang, Cheongwon 363-883 (Korea, Republic of)

2008-10-15T23:59:59.000Z

363

Procedures for sprinkler anchor installation on surfaces with fireproofing materials  

SciTech Connect

Procedures were developed for limiting the release of fibers from fireproofing material during sprinkler hanger anchor installation on steel deck/concrete floor slab surfaces. These procedures were needed by the General Services Administration (GSA) for installation of sprinkler systems in buildings having fireproofing containing asbestos. A prototype floor slab having spray-on friable mineral wool fireproofing was used in laboratory tests. The mineral-wool fireproofing was used as a model system for fireproofing containing asbestos. The various combinations of mechanical anchoring procedures (use of drills or powder-actuated gun) and encapsulation procedures tested limited the fiber release to a range of values of 0.000 to 0.055 f/cc (fibers per cubic centimeter) as compared to a range of values of 0.26 to 0.82 f/cc for procedures without encapsulation. Encapsulation was shown to be effective as evidenced by much higher levels of fiber release during testing without encapsulation. Because there is no known correlation between the release of mineral-wool fibers and asbestos fibers, it was recommended that the procedures developed be evaluated by GSA in buildings having fireproofing containing asbestos. An air-sampling protocol was developed for use by GSA in evaluating the procedures in the field. Subsequently field tests were conducted by GSA. The laboratory and field studies provided GSA with an effective procedure, measurement method, and decision tool for installing sprinkler hanger anchors in steel deck/concrete floor slabs having fireproofing materials.

Mathey, R.G.; Knab, L.I.; Gross, J.L.; Small, J.A.

1988-02-01T23:59:59.000Z

364

Design and installation manual for thermal energy storage  

DOE Green Energy (OSTI)

The purpose for this manual is to provide information on the design and installation of thermal energy storage in solar heating systems. It is intended for contractors, installers, solar system designers, engineers, architects, and manufacturers who intend to enter the solar energy business. The reader should have general knowledge of how solar heating systems operate and knowledge of construction methods and building codes. Knowledge of solar analysis methods such as f-chart, SOLCOST, DOE-1, or TRNSYS would be helpful. The information contained in the manual includes sizing storage, choosing a location for the storage device, and insulation requirements. Both air-based and liquid-based systems are covered with topics on designing rock beds, tank types, pump and fan selection, installation, costs, and operation and maintenance. Topics relevant to heating domestic water include safety, single- and dual-tank systems, domestic water heating with air- and liquid-based space heating system, and stand-alone domestic hot water systems. Several appendices present common problems with storage systems and their solutions, heat transfer fluid properties, heat exchanger sizing, and sample specifications for heat exchangers, wooden rock bins, steel tanks, concrete tanks, and fiberglass-reinforced plastic tanks.

Cole, R L; Nield, K J; Rohde, R R; Wolosewicz, R M [eds.

1979-02-01T23:59:59.000Z

365

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CC-1-I Availability: This rate schedule shall be available to public bodies and cooperatives served through the facilities of Carolina Power & Light Company, Western Division (hereinafter called the Customers). Applicability: This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating

366

Permitting Best Practices Make Installing Solar Easier: Technical Assistance (Fact Sheet), NREL (National Renewable Energy Laboratory)  

NLE Websites -- All DOE Office Websites (Extended Search)

NREL staff NREL staff can help states and local jurisdictions assess permitting processes, standardization approaches across a region, and permit fee options. t e c h n i c a l a s s i s ta n c e Permitting Best Practices Make Installing Solar Easier Common-Sense Improvements Address Top-Three Permitting Issues The U.S. solar industry has reached a turning point. While photovoltaic (PV) hardware costs exhibit rapid decline, non-hardware balance of system (BOS) costs such as permitting and inspection have remained relatively constant. The United States comprises more than 18,000 local jurisdictions whose permitting requirements and fees vary widely. The lack of permitting standardization across jurisdictions and inefficient permitting processes create challenges

367

Performance of An Adjustable Strength Permanent Magnet Quadrupole  

SciTech Connect

An adjustable strength permanent magnet quadrupole suitable for use in Next Linear Collider has been built and tested. The pole length is 42cm, aperture diameter 13mm, peak pole tip strength 1.03Tesla and peak integrated gradient * length (GL) is 68.7 Tesla. This paper describes measurements of strength, magnetic CL and field quality made using an air bearing rotating coil system. The magnetic CL stability during -20% strength adjustment proposed for beam based alignment was < 0.2 microns. Strength hysteresis was negligible. Thermal expansion of quadrupole and measurement parts caused a repeatable and easily compensated change in the vertical magnetic CL. Calibration procedures as well as CL measurements made over a wider tuning range of 100% to 20% in strength useful for a wide range of applications will be described. The impact of eddy currents in the steel poles on the magnetic field during strength adjustments will be reported.

Gottschalk, S.C.; DeHart, T.E.; Kangas, K.W.; /STI Optronics, Bellevue; Spencer, C.M.; /SLAC; Volk, J.T.; /Fermilab

2006-03-01T23:59:59.000Z

368

Electron current extraction from a permanent magnet waveguide plasma cathode  

SciTech Connect

An electron cyclotron resonance plasma produced in a cylindrical waveguide with external permanent magnets was investigated as a possible plasma cathode electron source. The configuration is desirable in that it eliminates the need for a physical antenna inserted into the plasma, the erosion of which limits operating lifetime. Plasma bulk density was found to be overdense in the source. Extraction currents over 4 A were achieved with the device. Measurements of extracted electron currents were similar to calculated currents, which were estimated using Langmuir probe measurements at the plasma cathode orifice and along the length of the external plume. The influence of facility effects and trace ionization in the anode-cathode gap are also discussed.

Weatherford, B. R.; Foster, J. E. [University of Michigan, Ann Arbor, Michigan 48109 (United States); Kamhawi, H. [NASA Glenn Research Center, Cleveland, Ohio 44135 (United States)

2011-09-15T23:59:59.000Z

369

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tenaslta Power Services Co. Tenaslta Power Services Co. OE Docket No. EA-243-A Order Authorizing Electricity Exports to Canada Order No. EA-243-A March 1,2007 Tenaska Power Services Co. Order No. EA-243-A I. BACKGROUND Exports of elcctricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 30 I(b) and 402(f) of the Departrncnt of' Energy Organizatio~l Act (42 U, S.C. 7 15 1 (b), 7 1 72Cf)) and rcquirc authorization under section 202(e) of the Federal Power Act (FPA) ( Z 6 U. s.c.824a(e)j1. On August 16,2001, DOE issued Order No. EA-243 authorizing Tenaska Power Scrvices Co. (Tenaska) to transmit electric cncrgy from the United States to Canada as a power marketer. That authority expired on August 16,2003. On August 14,2006, Teilaska applied to renew the electricity export authority

370

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TexMex Energy, LLC TexMex Energy, LLC OE Docket No. EA-294-A Order Authorizing Electricity Exports to Mexico Order No. EA-294-A February 22, 2007 TexMex Energy, LLC Order No. EA-294-A I. BACKGROUND Exports of electricity from the United States to a foreign count~y are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department of Energy Organization Act (42 U.S.C. 7 15 1 (b), 71 72(f)) and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C.824a(e)) . On August 25,2004, DOE issued Order No. EA-294 authorizing TexMex Energy LLC (TexMex) to transmit electric energy fiom the United States to Mexico as a power marketer. That authority expired on August 25, 2006. On September 8, 2006, TexMex applied to renew the electricity export authority

371

United States  

Gasoline and Diesel Fuel Update (EIA)

United States United States Coal ................................................ 4,367 4,077 4,747 4,181 4,473 4,125 4,983 4,330 4,414 4,003 4,796 4,178 4,344 4,479 4,348 Natural Gas .................................... 2,802 2,843 3,694 2,863 2,713 2,880 3,636 2,707 2,792 2,972 3,815 2,849 3,052 2,986 3,109 Petroleum (a) .................................. 74 73 81 67 73 70 75 66 75 70 76 66 74 71 71 Other Gases ................................... 32 33 36 32 32 34 37 33 33 35 39 34 33 34 35 Nuclear ........................................... 2,176 2,044 2,257 2,170 2,106 2,037 2,167 2,010 2,144 2,074 2,206 2,055 2,162 2,080 2,120 Renewable Energy Sources: Conventional Hydropower ........... 736 886 716 633 765 887 708 646 767 919 729 659 742 751 768 Wind ............................................ 491 520 353 449 477 521 379 475

372

Modeling And Analysis of Radial Flux Toroidally Wound Twin Rotor Permanent Magnet Motor.  

E-Print Network (OSTI)

??The main objective of current thesis is the study of Radial Flux Twin Rotor Permanent Magnet (RFTWTRPM) motor. The tasks were to review the literature (more)

Pratapa, Ravi Kishore

2010-01-01T23:59:59.000Z

373

Initial rotor position estimation for low saliency interior permanent-magnet synchronous motor drives.  

E-Print Network (OSTI)

??This work presents an initial rotor position estimation method for low saliency interior permanent-magnet synchronous motor (IPMSM) drives. The method injects signals into the stationary (more)

Yang, Yan.

2010-01-01T23:59:59.000Z

374

Design of a Ferrite Permanent Magnet Rotor for a Wind Power Generator.  

E-Print Network (OSTI)

?? Due to the insecurity of the supply of raw materials needed for neodymium-iron-boron magnets, typically used in permanent magnet generators, the use of ferrite (more)

Eklund, Petter

2013-01-01T23:59:59.000Z

375

Study on Performance Characteristics of Interior Permanent Magnet Synchronous Motor Due to Rotor Configuration.  

E-Print Network (OSTI)

??This research study was conducted in an effort to understand what effects the rotor configuration has on the performance of a permanent magnet synchronous machine, (more)

Kettlewell, James

2013-01-01T23:59:59.000Z

376

Dynamic high pressure process for fabricating superconducting and permanent magnetic materials  

DOE Patents (OSTI)

Shock waves directed on thin layers of materials is used to form superconducting and permanent magnetic materials with improved microstructures. 9 figs.

Nellis, W.J.; Maple, M.B.; Geballe, T.H.

1986-12-04T23:59:59.000Z

377

A dual-channel flux-switching permanent magnet motor for hybrid electric vehicles  

Science Conference Proceedings (OSTI)

The flux-switching permanent magnet (FSPM) motor is a relatively novel brushless machine having both magnets and concentrated windings in the stator

Wei Hua; Zhongze Wu; Ming Cheng; Baoan Wang; Jianzhong Zhang; Shigui Zhou

2012-01-01T23:59:59.000Z

378

Part load operation and heat recovery optimization in cogeneration units with diesel engines  

Science Conference Proceedings (OSTI)

This paper investigates the optimization possibilities of different co-generation units with diesel engines especially applied in small and middle-size biogas power plant installations. The first subject of the publication is the analysis of ...

Slawomir Smolen

2008-05-01T23:59:59.000Z

379

Climatology of Transport and Diffusion Conditions along the United States Atlantic and Gulf Coasts  

Science Conference Proceedings (OSTI)

A study of the atmospheric transport and diffusion climatology of the United States east and Gulf coasts was conducted to aid in planning and site selection for potentially polluting installations. This paper presents selected results from an ...

Gilbert S. Raynor; Janet V. Hayes

1981-08-01T23:59:59.000Z

380

Winter Weather Forecasting throughout the Eastern United States. Part IV: Lake Effect Snow  

Science Conference Proceedings (OSTI)

This article is the final installment of a four-part series that examines the challenge of forecasting winter weather throughout the eastern United States. This paper examines the problems and challenges of forecasting lake effect snows. The ...

Thomas A. Niziol; Warren R. Snyder; Jeff S. Waldstreicher

1995-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Wind Power Development in the United States: Current Progress, Future Trends  

E-Print Network (OSTI)

Annual Report on U.S. Wind Power Installation, Cost, andWind Power Development in the United States: Current94720 Abstract: The U.S. wind power industry is in an era of

Wiser, Ryan H

2009-01-01T23:59:59.000Z

382

PROPOSAL FOR INSTALLATION OF EQUIPMENT FOR TREATMENT OF ORNL HIGH LEVEL WASTE  

SciTech Connect

It is proposed that neutralized ORNL storage tank supernate waste be used as a feed for a waste processing development facility. An electrolytic cell can be installed to remove nitrate and ruthenium from the wastes prior to discharge to the soil disposal pits. This eliminates the hazards of nitrate and ruthenium in the ORNL soil disposal pits. In addition, a continuous ion exchange unit can be installed to study the isolation of fission products from a portion of the waste stream. The total waste stream can be processed by the ion exchange if desired. A six to eight inch diameter continuous ion exchange contactor is considered sufficient to remove cesium, strontium, and rare earths from 5,000 to 10,000 gallons of waste per day. The estimated installed cost of such a unit is about ,000. The labor and chemical operating cost at 100% overhead is estimated at .50 per day. Three types of electrolytic cells were considered. All of the cells remove about 90% of the ruthenium by plating on the cathode. It is expected that the degree of ruthenium removed may be increased by further laboratory development. The first cell type is the Ionics cell which converts NaNO/sub 3/ to NaOH and HNO/sub 3/ for recycle. The second is the nitrate reduction (or destruction) cell which produces caustic and ammonia gas, as studied by KAPL. The acid-base cell is favored because of a factor of 8 lower power consumption, and the nitric acid may be reused as well as sodium hydroxide. An acid-base cell with rectifier for 5,000 gallons per day of 0.3 M NaNO/sub 3/ waste is estimated at about ,000. The operating cost with 100% overhead, including labor, electricity, and cell maintenance is estimated at .72 per day. Operations may be credited with per day of caustic and per day of nitric acid. If it is desired to isolate the ruthenium and not remove the nitrate, a simplified electrolytic cell may be used. Cell cost is estimited at approximates 80% of the acid-base cell and about one tenth the cost for a rectifier. About 90% of the ruthenium may be conveniently removed. Technetium is not considered a radioactive hazard, but recovery is considered because of its value and expected ease of recovery. Technetium is not scavenged and has a very great affinity for anion resin. At current prices it is estimated that 0.25 g per day of technetium is being discharged at ORNL, which at present prices is 000/day. (auth)

Higgins, I.R.

1957-10-24T23:59:59.000Z

383

Advances in Energy Efficiency, Capital Cost, and Installation Schedules for Large Capacity Cooling Applications Using a Packaged Chiller Plant Approach  

E-Print Network (OSTI)

Cooling equipment, whether used to meet air-conditioning or process cooling loads, represents a large consumer of energy. Even more to the point, cooling loads and the associated cooling equipment energy consumption tend to be at maximum levels during periods of high ambient air temperatures. It is precisely at those times that the general demand for energy is at its peak and therefore the price or value of energy is also at its highest level. Cooling loads often drive the peak electric power demand of energy users and thus affect not only the level of consumption of high cost energy, but also affect the peak power demand. Together, the energy and demand costs equate to very high unit costs for operating cooling equipment. Accordingly, it is of interest to minimize cooling energy use and costs by maximizing the energy efficiency of cooling equipment installations. A relatively new approach has been developed and is being increasingly used to maximize chiller plant efficiency. The approach involves the use of a standardized, pre-engineered, shop-fabricated approach to entire chiller plant installations. Compared to the traditional, piece-meal approach to chiller plants that utilize individual component specification, procurement and installation, the "packaged" or modular chiller plant approach often delivers substantially improved energy efficiencies. Also, the packaged plant approach achieves further benefits for large cooling system owners and operators. These additional benefits include: 1) dramatic reductions in unit capital costs of installed chiller plant capacity on a dollar per ton basis, 2) marked improvements in total procurement and installation schedules, 3) significantly smaller space requirements, and 4) enhanced control over total system quality and performance. The capacities and performance characteristics of available chiller plant modules are described, including both electric and non-electric chiller technologies. Examples are presented to illustrate the typical sizes and locations of actual installations as well as the growth and extent of the use of this technology to-date. Case studies document the energy efficiency improvements, cost reductions in both operating and capital costs, and improvements in schedule and space utilization, of the packaged chiller plant approach relative to the traditional chiller plant approach.

Pierson, T. L.; Andrepont, J. S.

2003-05-01T23:59:59.000Z

384

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bangor Hydro-Electric Company Bangor Hydro-Electric Company OE Docket No. PP-89-1 Amendment to Presidential Permit Order No. PP-89-1 December 30,2005 PRESIDENTIAL PERMIT AMENDMENT Bangor Hydro-Electric Company Order No. PP-89-1 I. BACKGROUND The Department of Energy (DOE) has responsibility for implementing Executive Order (E.O.) 10485, as amended by E.O. 12038, which requires the issuance of a Presidential permit by DOE before electric trans~nission facilities may be constructed, operated, maintained, or connected at the borders of the United States. DOE may issue such a permit if it determines that the permit is in the public interest and after obtaining favorable recommendations from the U.S. Departments of State and Defense. On December 16, 1988, Bangor Hydro-Electric Company (BHE) applied to DOE

385

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CTV-1-H Availability: This rate schedule shall be available to the Tennessee Valley Authority (hereinafter called TVA). Applicability: This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland Projects") and the Laurel Project sold under agreement between the Department of Energy and TVA. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating current at a frequency of approximately 60 hertz at the outgoing terminals of the Cumberland

386

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CTVI-1-A Availability: This rate schedule shall be available to customers (hereinafter called the Customer) who are or were formerly in the Tennessee Valley Authority (hereinafter called TVA) service area. Applicability: This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland Projects") and the Laurel Project sold under agreement between the Department of Energy and the Customer. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating

387

UNITED STATES  

Office of Legacy Management (LM)

f).~<~~ \--\c :y-,ai F p"- KG f).~<~~ \--\c :y-,ai F p"- KG WASHINOTDN 28.0. C. ' -lr ' \ ' ' --- ".I ?--" ' z I. .~;-4.' J frr*o& 2 ii, - - -4 70-147 LRL:JCD JAN !! 8 1958 Oregon Metallurgical Corporation P. 0. Box 484 Albany, Oregon Attention: Mr. Stephen M. Shelton General Manager Gentlemen: Enclosed is Special Nuclear Material License No. SNM-144, as amended. Very 33uly yours, r:; I,;, ll)~gQ""d".- Lyall Johnson Chief, Licensing Branch Division of Licensing & Regulation Enclosure: SNM-144, as amended Distribution: bRO0 Attn: Dr. H.M.Roth DFMusser NMM MMMann INS JCRyan FIN (2) HSteele LRL SRGustavson LRL Document room Formal file Suppl. file Br & Div rf's ' .b liwwArry s/VW- ' q+ ' yj/ 2; 2-' , COP' 1 J JAM01958 -- UNITED STATES ATOMIC ENERGY COMMISSION

388

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule JW-2-F Availability: This rate schedule shall be available to the Florida Power Corporation (or Progress Energy Florida, hereinafter called the Company). Applicability: This rate schedule shall be applicable to electric energy generated at the Jim Woodruff Project (hereinafter called the Project) and sold to the Company in wholesale quantities. Points of Delivery: Power sold to the Company by the Government will be delivered at the connection of the Company's transmission system with the Project bus. Character of Service: Electric power delivered to the Company will be three-phase alternating current at a nominal frequency of 60 cycles per second.

389

Install the E-print Network toolbar -- Energy, science, and technology for  

Office of Scientific and Technical Information (OSTI)

Browser Toolbar The E-print Network offers a browser toolbar for easy access to e-print searches and discipline pages. EPN browser toolbar Two installation options are available for the EPN browser toolbar: Internet Explorer - Download and install the toolbar using the Softomate ActiveX Web installer Please select "Install ActiveX Control" when prompted by your browser. Install toolbar for Internet Explorer Can't see the toolbar after installing? Note: Browser security settings at some organizations may prevent installation or use of the toolbar in Internet Explorer. Try installing the toolbar in the FireFox browser, using the button below. Minimum System Requirements: Windows XP/Vista Internet Explorer 6 or Firefox 2 FireFox - Install toolbar for FireFox

390

The necessity for permanence : making a nuclear waste storage facility  

E-Print Network (OSTI)

The United States Department of Energy is proposing to build a nuclear waste storage facility in southern Nevada. This facility will be designed to last 10,000 years. It must prevent the waste from contaminating the ...

Stupay, Robert Irving

1991-01-01T23:59:59.000Z

391

Solar heating and hot water system installed at Listerhill, Alabama  

DOE Green Energy (OSTI)

The solar system was installed into a new buildng and was designed to provide 79% of the estimated annual space heating load and 59% of the estimated annual potable hot water requirement. The collectors are flat plate, liquid manufactured by Reynolds Metals Company and cover a total area of 2344 square feet. The storage medium is water inhibited with NALCO 2755 and the container is an underground, unpressurized steel tank with a capacity of 5000 gallons. This final report describes in considerable detail the solar heating facility and contains detailed drawings of the completed system.

Not Available

1978-12-01T23:59:59.000Z

392

Installation, Operation, and Maintenance Costs for Distributed Generation Technologies  

Science Conference Proceedings (OSTI)

Distributed generation (DG) is a broad term that encompasses both mature and emerging onsite power generation technologies with power output as small as 1 kW and as large as 20 MW. While the equipment or purchase cost of a DG system is very important, installation, operation, and maintenance (IOM) costs also are significant and often overlooked. This report reviews IOM costs for both mature and emerging DG technologies. Some equipment cost data is included for reference, but is not the focus of this repo...

2003-02-03T23:59:59.000Z

393

Oil/gas separator for installation at burning wells  

DOE Patents (OSTI)

An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait's oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

Alonso, Carol T. (Orinda, CA); Bender, Donald A. (Dublin, CA); Bowman, Barry R. (Livermore, CA); Burnham, Alan K. (Livermore, CA); Chesnut, Dwayne A. (Pleasanton, CA); Comfort, III, William J. (Livermore, CA); Guymon, Lloyd G. (Livermore, CA); Henning, Carl D. (Livermore, CA); Pedersen, Knud B. (Livermore, CA); Sefcik, Joseph A. (Tracy, CA); Smith, Joseph A. (Livermore, CA); Strauch, Mark S. (Livermore, CA)

1993-01-01T23:59:59.000Z

394

Oil/gas separator for installation at burning wells  

DOE Patents (OSTI)

An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait`s oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

Alonso, C.T.; Bender, D.A.; Bowman, B.R. [and others

1991-12-31T23:59:59.000Z

395

Video Installation Design: Appropriation and Assemblage As Projection Surface Geometry  

E-Print Network (OSTI)

This area of research focuses on the use of video projections in the context of fine art. Emphasis is placed on creating a unique video installation work that incorporates assemblage and appropriation as a means to develop multiple complex geometrical surfaces for video projection. The purpose of this research is to document a working process within a pre-defined set of guidelines that is influenced from my past work and the study of other artist?s prior work. Research includes the demonstration of the entire working process to create this original work and recommendations for future artists who wish to work in this medium.

Weaver, Timothy A.

2010-05-01T23:59:59.000Z

396

Solar hot water system installed at Anderson, South Carolina  

DOE Green Energy (OSTI)

The solar energy hot water system installed in the Days Inns of America, Inc., at Anderson, South Carolina is described. The building is a low-rise two-story 114-room motel. The solar components were partly funded by the Department of Energy. The solar system was designed to provide 40% of the total hot water demand. The collector is a flat plate, liquid with an area of 750 square feet. Operation of this system was begun in November 1977, and has performed flawlessly for one year.

Not Available

1978-12-01T23:59:59.000Z

397

Oil/gas separator for installation at burning wells  

DOE Patents (OSTI)

An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait's oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

Alonso, C.T.; Bender, D.A.; Bowman, B.R.; Burnham, A.K.; Chesnut, D.A.; Comfort, W.J. III; Guymon, L.G.; Henning, C.D.; Pedersen, K.B.; Sefcik, J.A.; Smith, J.A.; Strauch, M.S.

1993-03-09T23:59:59.000Z

398

Quality Assurance of LHC Cryogenic Instrumentation during Installation and Commissioning  

E-Print Network (OSTI)

The operation and monitoring of the LHC requires a cryogenic instrumentation system of an unprecedented size (800 instrumentation crates, holding 15000 sensors and actuators), with strict constraints on temperature measurement uncertainty and radiation hardness for all sensors and actuators. This paper presents the applied procedures of quality assurance and the specific hard- & software tools used to meet and track the mentioned requirements during its lifetime (fabrication, installation, commissioning, operation and maintenance); within the given constraints of time schedule, accessibility and coordination with other teams.

Lopez Lorente, A; Casas-Cubillos, J; Fortescue, E; Gomes, P; Jeanmonod, N; Peacoba, G; Vauthier, N

2008-01-01T23:59:59.000Z

399

Impact of Permanent Magnet Field on Inductance Variation of a PMLSM Julien Gomand1  

E-Print Network (OSTI)

of Surface Mounted Permanent Magnet Linear Synchronous Motors are generally presented with constantImpact of Permanent Magnet Field on Inductance Variation of a PMLSM Julien Gomand1 , Ghislain Remy1 Linear drive, Modelling, Estimation technique, Synchronous motor, Harmonics. Abstract Analytical models

Paris-Sud XI, Université de

400

Pulsating Torque Reduction for Permanent Magnet Bojan Grcar, Peter Cafuta, Gorazd Stumberger  

E-Print Network (OSTI)

Pulsating Torque Reduction for Permanent Magnet AC Motors Bojan Grcar, Peter Cafuta, Gorazd on the motor design (skewing, shifting the magnet position, special windings, etc.) [5], [6] are in general,MA Abstract-- Control methods for pulsation of torque reduction for the surface-mounted permanent magnet

Stankoviæ, Aleksandar

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

COMPARAISON DES PERFORMANCES DE DEUX MOTEURS LECTRIQUES AUTOPILOTS : LE MOTEUR SYNCHRONE AIMANTS PERMANENTS  

E-Print Network (OSTI)

SELF COMMUTATED ELECTRIC MOTORS : THE PERMANENT MAGNET BRUSHLESS DC MOTOR THE SWITCHED RELUCTANCE MOTOR synchronous brushless motors. These motors are, on one hand, the permanent-magnet brushless DC motor supplied by quasi-square currents, with magnets mounted at rotor surface and trapezoidal e.m.f. waveform, and

Paris-Sud XI, Université de

402

Current Controller with Defined Dynamic Behavior for an Interior Permanent Magnet  

E-Print Network (OSTI)

Current Controller with Defined Dynamic Behavior for an Interior Permanent Magnet Synchronous Motor saturation and changing motor parameters. In this paper a current control scheme is presented that ensures combustion vehicles already provide. Today's modern HEV and EV mostly include interior permanent magnet

Noé, Reinhold

403

Design of optimal digital controller for stable super-high-speed permanent-magnet synchronous  

E-Print Network (OSTI)

Design of optimal digital controller for stable super-high-speed permanent-magnet synchronous motor collaborative design scheme of a super-high-speed permanent-magnet synchronous motor (PMSM) and its digital controller is presented, which provides a low-cost but highly efficient motor system with guaranteed

Wu, Shin-Tson

404

Optimum Control for Interior Permanent Magnet Synchronous Motors (IPMSM) in Constant  

E-Print Network (OSTI)

Optimum Control for Interior Permanent Magnet Synchronous Motors (IPMSM) in Constant Torque and Electrical Drives, Paderborn, Germany Abstract--Interior Permanent Magnet Synchronous Motors (IPMSM) gain weakening range. Operation during flux weakening, however, causes stress to the magnets of the motor

Noé, Reinhold

405

Modular Permanent Magnet Machine Based on Soft Magnetic *** Burgess-Norton Mfg.Co.  

E-Print Network (OSTI)

of surface permanent magnet motor, and [8] small induction motors. In this paper, novel single phase2005-30 Modular Permanent Magnet Machine Based on Soft Magnetic Composite *** Burgess-Norton Mfg magnetic composite (SMC) material, electric machine design is no longer limited to the traditional iron

Lipo, Thomas

406

SVPWM-Based Simulation of Direct Torque Control in Permanent Magnet Synchronous Motor  

Science Conference Proceedings (OSTI)

On the basis of analysis of the mathematical model of permanent magnet synchronous motor (PMSM), this paper is to propose a new type direct torque control system based on space vector pulse width modulation (SVPWM) technology aiming at big torque ripple, ... Keywords: permanent magnet synchronous motor, direct torque control, space vector pulse width modulation, MATLAB/Simulink

Huang Xianghui, Sun Nan

2013-10-01T23:59:59.000Z

407

Design and Analysis of a Nested Halbach Permanent Magnet Magnetic Refrigerator  

E-Print Network (OSTI)

Design and Analysis of a Nested Halbach Permanent Magnet Magnetic Refrigerator by Armando Tura BEng Committee Design and Analysis of a Nested Halbach Permanent Magnet Magnetic Refrigerator by Armando Tura with the potential to create efficient and compact refrigeration devices is an active magnetic regenerative

Victoria, University of

408

Optimal control in energy conversion of small wind power systems with permanent-magnet-synchronous-generators  

Science Conference Proceedings (OSTI)

This paper presents the results of experimental investigation of a low-power wind energy conversion system (WECS), based on a permanent-magnet synchronous generator (PMSG) connected directly to the turbine. A development system was built in order to ... Keywords: hardware-in-the-loop simulation, maximum power point tracking, optimal control, permanent-magnet synchronous generator, wind system

C. Vlad; I. Munteanu; A. I. Bratcu; E. Ceanga

2008-07-01T23:59:59.000Z

409

Energy Saving "Cool Roofs" Installed at Y-12 | National Nuclear...  

National Nuclear Security Administration (NNSA)

the United States Senate Committee on Armed Services Sep 17, 2013 NNSA, Republic of Korea Ministry Agree to Minimize Use of HEU in Nuclear Reactors Sep 3, 2013 NNSA Conducts...

410

Questions and Answers - Why is a non-permanent, but long lasting, magnet  

NLE Websites -- All DOE Office Websites (Extended Search)

Which jobs use electromagnets? Which jobs use electromagnets? Previous Question (Which jobs use electromagnets?) Questions and Answers Main Index Next Question (Can you turn something into a magnet by banging on it in a specific way?) Can you turn something into a magnetby banging on it in a specific way? Why is a non-permanent, but long lasting, magnet called a permanent magnet? Permanent magnets are magnets that you don't have to use energy to make them magnetic. Some types of permanent magnets, relative to the length of lives of humans, are pretty close to permanent. They decay slowly, but they do decay. When most of the magnetic domains in a material align in one direction you can call that a magnet. It helps if you can imagine a magnet as being made up of a bunch of little magnets. Each one has tiny North and

411

LANSCE harp upgrade: analysis, design, fabrication and installation  

SciTech Connect

The primary goal of this newly installed beam profile measurement is to provide the facility operators and physicists with a reliable horizontal and vertical projected beam distribution and location with respect to the proton beam target and beam aperture. During a 3000-hour annual run cycle, 5 {mu}C of charge is delivered every 50 milliseconds through this harp to the downstream TRMS Mark III target. The resulting radioactive annual dose near this harp is at least 6 MGy. Because of this harsh environment, the new harp design has been further optimized for robustness. For example, compared to an earlier design, this harp has half of the sensing wires and utilizes only a single bias plane. The sensing fibers are 0.079-mm diameter SiC fibers. To hold these fibers to a rigid ceramic structure, a collet fiber-clamping device accomplishes the three goals of maintaining a mechanical fiber clamp, holding the sense fibers under a slight tensile force, and providing a sense-fiber electrical connection. This paper describes the harp analysis and design, and provides fabrication, assembly, and some installation information, and discusses wiring alterations.

Gilpatrick, John D [Los Alamos National Laboratory; Chacon, Phillip [Los Alamos National Laboratory; Martinez, Derwin [Los Alamos National Laboratory; Power, John F [Los Alamos National Laboratory; Smith, Brian G [Los Alamos National Laboratory; Taylor, Mark A [Los Alamos National Laboratory; Gruchalla, Mike [Los Alamos National Laboratory

2010-01-01T23:59:59.000Z

412

Hybrid permanent magnet quadrupoles for the Recycler Ring at Fermilab  

Science Conference Proceedings (OSTI)

Hybrid Permanent Magnet Quadrupoles are used in several applications for the Fermilab Recycler Ring and associated beam transfer lines. Most of these magnets use a 0.6096 m long iron shell and provide integrated gradients up to 1.4 T-m/m with an iron pole tip radius of 41.6 mm. A 58.4 mm pole radius design is also required. Bricks of 25. 4 mm thick strontium ferrite supply the flux to the back of the pole to produce the desired gradients (0.6 to 2.75 T/m). For temperature compensation, Ni-Fe alloy strips are interspersed between ferrite bricks to subtract flux in a temperature dependent fashion. Adjustments of the permeance of each pole using iron between the pole and the flux return shell permits the matching of pole potentials. Magnetic potentials of the poles are adjusted to the desired value to achieve the prescribed strength and field uniformity based on rotating coil harmonic measurements. Procurement, fabrication, pole potential adjustment, and measured fields will be reported.

Brown, B.C.; Pruss, S.M.; Foster, G.W.; Glass, H.D.; Harding, D.J.; Jackson, G.R.; May, M.R.; Nicol, T.H.; Ostiguy, J.-F.; Schlabach, R.; Volk, J.T.

1997-10-01T23:59:59.000Z

413

Aisin G-60 Packaged MicroCHP Unit  

Science Conference Proceedings (OSTI)

This report summarizes laboratory test experience with a 6-kWe micro-cogeneration system developed by Aisin Seiki Corporation, an affiliate of Toyota Corporation of Japan. Over 400 of these units have been deployed to date in Japan. In the U.S., a single unit has been in operation at a restaurant near Syracuse, New York since January 2004. Other units were installed in Iowa, Oklahoma, and Michigan in late 2004. An additional 20 units were planned for expanded field trials in summer 2005, including the su...

2006-03-27T23:59:59.000Z

414

Outdoor unit construction for an electric heat pump  

DOE Patents (OSTI)

The outdoor unit for an electric heat pump is provided with an upper portion 10 containing propeller fan means 14 for drawing air through the lower portion 12 containing refrigerant coil means 16 in the form of four discrete coils connected together in a subassembly forming a W shape, the unit being provided with four adjustable legs 64 which are retracted in shipment, and are adjusted on site to elevate the unit to a particular height suitable for the particular location in which the unit is installed.

Draper, Robert (Pittsburgh, PA); Lackey, Robert S. (Pittsburgh, PA)

1984-01-01T23:59:59.000Z

415

Outdoor unit construction for an electric heat pump  

DOE Patents (OSTI)

The outdoor unit for an electric heat pump is provided with an upper portion containing propeller fan means for drawing air through the lower portion containing refrigerant coil means in the form of four discrete coils connected together in a subassembly forming a W shape, the unit being provided with four adjustable legs which are retracted in shipment, and are adjusted on site to elevate the unit to a particular height suitable for the particular location in which the unit is installed. 4 figs.

Draper, R.; Lackey, R.S.

1984-09-11T23:59:59.000Z

416

205 kW Photovoltaic (PV) System Installed on the U.S. Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

205 kW Photovoltaic (PV) System Installed on the U.S. Department of Energy's Forrestal Building 205 kW Photovoltaic (PV) System Installed on the U.S. Department of Energy's...

417

Instructions to install the Wimax extension for NS-2 Content I ...  

Science Conference Proceedings (OSTI)

... steps need to be followed to install the wimax extension: step1: add the wimax directory in the ns installation step2: add the tcl/wimax directory step3 ...

2013-05-18T23:59:59.000Z

418

New Berkeley Lab Report Tracks a Decade of PV Installed Cost Trends  

E-Print Network (OSTI)

of PV Installed Cost Trends Galen Barbose, Carla Peterman,fill this need by summarizing trends in the installed cost (the broader geographical trends in the U.S. PV market, the

Barbose, Galen

2009-01-01T23:59:59.000Z

419

Prospect for using fresnel lenses for the concentrating systems of solar installations  

SciTech Connect

The state of development work on Fresnel lenses is reported. The possibility of using them in solar installations is analyzed. It is concluded that Fresnel lenses represent promising optical systems for solar installations.

Lidorenko, N.S.; Zhukov, K.V.; Nabiullin, F.Kh.; Tver' yanovich, E.V.

1977-01-01T23:59:59.000Z

420

Annual Report on U.S. Wind Power Installation, Cost, and Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2007 Title Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2007...

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Annual Report on U.S. Wind Power Installation, Cost, and Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006 Title Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006...

422

Installation restoration program records search for 158 tactical fighter group, Vermont Air National Guard, Burlington international airport  

SciTech Connect

The Burlington ANG Installation records search included a detailed review of pertinent installation records, contacts with 12 government organizations for documents relevant to the records search effort, and an onsite installation visit conducted by CH2M HILL during July 5 through 8, 1983. Activities conducted during the onsite installation visit included interviews with 19 past and present installation employees, ground tours of installation facilities, and a detailed search of installation records.

1983-09-01T23:59:59.000Z

423

Underground Transmission Cable System Construction and Installation Practices Manual 2012 Update  

Science Conference Proceedings (OSTI)

A reliable underground transmission line depends on acceptable cable system manufacturing, design, construction, installation, operation, and maintenance. Within implementation, construction and installation remain the most expensive processes. Recent advances in underground transmission have led to more demand for best practices and innovative ways to reduce construction and installation costs in a cable project.Background ...

2012-12-12T23:59:59.000Z

424

Solar Energy Development onSolar Energy Development on DoD Installations in the  

E-Print Network (OSTI)

Solar Energy Development onSolar Energy Development on DoD Installations in the Mojave & Colorado/how solar can contribute to installation level energy· Assess whether/how solar can contribute to installation-level energy security · Recommend policy and programmatic modifications to accelerate solar

425

Solar Power Systems Find A Professional Solar Energy Installer For Any  

E-Print Network (OSTI)

Solar Power Systems Find A Professional Solar Energy Installer For Any Type Of System www.CleanEnergyAuthority.com Install Solar Panels Enter Your Zip Code & Connect To Pre-Screened Solar Panel Installers www.ServiceMagic.com Biomass Pumps Reliable metering for apps from microflow to scale-up & pilot plant www.isco.com The Solar

Lovley, Derek

426

Solar water heater installation guidelines. A manual for homeowners and professionals. [Includes glossary  

SciTech Connect

The guidelines include detailed diagrams, a selected glossary, a bibliography of books and manuals which might prove useful and a checklist which should be used during and after the installation. The guidelines explain generally how to install a liquid solar hot water heater, but not a specific system. The following are covered: collector location, collector installation, plumbing, solar storage tanks, electrical, and insulation. (MHR)

1978-04-01T23:59:59.000Z

427

Survey of Gas Decontamination Problems at Installations of the Atomic Energy Commission  

SciTech Connect

A survey has been made of gas decontamination problems at the various installations of the Atomic Energy Commission and the results are reported. Installations visited include: The Hanford Engineer Works, Brookhaven National Laboratory, Argonne National Laboratory, Los Alamos Scientific Laboratory, Iowa State College Institute for Nuclear Research, Knolls Laboratory, and installations at Oak Ridge.

Lyon, A.M.

1948-06-03T23:59:59.000Z

428

Microsoft Word - CX-Ashe-CGSFiberInstallation_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2011 5, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Debbie Ruckwardt Electrical Engineer - TEP-CSB-1 Proposed Action: Installing fiber optic cables between Bonneville Power Administration's (BPA) Ashe Substation and Energy Northwest's Columbia Generating Station (CGS). Budget Information: Work Order # 00261540 PP&A Project No.: PP&A 1864 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designed purpose. Location: The project takes place between BPA's Ashe Substation and Energy Northwest's

429

Geothermal heating system and method of installing the same  

SciTech Connect

A geothermal system and method of installing the same comprises the steps successively driving a drive pipe structure vertically into the ground at a plurality of locations so that a major portion of the length of the drive pipe structure is located below the frost line. An elongate geothermal pipe having closed ends is inserted into the drive pipe structure and its lower end is interlocked with a drive point device located at the lower end of the drive pipe structure. Thereafter, when the drive pipe is removed, the geothermal pipe remains anchored to the drive point. The geothermal pipes are connected together by conduits and connected to a heat pump so that a heat exchange liquid will be circulated through the system.

Kees, E.J.; Steiger, D.W.

1981-09-01T23:59:59.000Z

430

Monte Carlo Simulation Tool Installation and Operation Guide  

Science Conference Proceedings (OSTI)

This document provides information on software and procedures for Monte Carlo simulations based on the Geant4 toolkit, the ROOT data analysis software and the CRY cosmic ray library. These tools have been chosen for its application to shield design and activation studies as part of the simulation task for the Majorana Collaboration. This document includes instructions for installation, operation and modification of the simulation code in a high cyber-security computing environment, such as the Pacific Northwest National Laboratory network. It is intended as a living document, and will be periodically updated. It is a starting point for information collection by an experimenter, and is not the definitive source. Users should consult with one of the authors for guidance on how to find the most current information for their needs.

Aguayo Navarrete, Estanislao; Ankney, Austin S.; Berguson, Timothy J.; Kouzes, Richard T.; Orrell, John L.; Troy, Meredith D.; Wiseman, Clinton G.

2013-09-02T23:59:59.000Z

431

Assembly and Installation of the Daya Bay Antineutrino Detectors  

E-Print Network (OSTI)

The Daya Bay reactor antineutrino experiment is designed to make a precision measurement of the neutrino mixing angle theta13, and recently made the definitive discovery of its nonzero value. It utilizes a set of eight, functionally identical antineutrino detectors to measure the reactor flux and spectrum at baselines of 300 - 2000m from the Daya Bay and Ling Ao Nuclear Power Plants. The Daya Bay antineutrino detectors were built in an above-ground facility and deployed side-by-side at three underground experimental sites near and far from the nuclear reactors. This configuration allows the experiment to make a precision measurement of reactor antineutrino disappearance over km-long baselines and reduces relative systematic uncertainties between detectors and nuclear reactors. This paper describes the assembly and installation of the Daya Bay antineutrino detectors.

H. R. Band; R. L. Brown; R. Carr; X. C. Chen; X. H. Chen; J. J. Cherwinka; M. C. Chu; E. Draeger; D. A. Dwyer; W. R. Edwards; R. Gill; J. Goett; L. S. Greenler; W. Q. Gu; W. S. He; K. M. Heeger; Y. K. Heng; P. Hinrichs; T. H. Ho; M. Hoff; Y. B. Hsiung; Y. Jin; L. Kang; S. H. Kettell; M. Kramer; K. K. Kwan; M. W. Kwok; C. A. Lewis; G. S. Li; N. Li; S. F. Li; X. N. Li; C. J. Lin; B. R. Littlejohn; J. L. Liu; K. B. Luk; X. L. Luo; X. Y. Ma; M. C. McFarlane; R. D. McKeown; Y. Nakajima; J. P. Ochoa-Ricoux; A. Pagac; X. Qian; B. Seilhan; K. Shih; H. Steiner; X. Tang; H. Themann; K. V. Tsang; R. H. M. Tsang; S. Virostek; L. Wang; W. Wang; Z. M. Wang; D. M. Webber; Y. D. Wei; L. J. Wen; D. L. Wenman; J. Wilhelmi; M. Wingert; T. Wise; H. L. H. Wong; F. F. Wu; Q. Xiao; L. Yang; Z. J. Zhang; W. L. Zhong; H. L. Zhuang

2013-09-06T23:59:59.000Z

432

Gas turbine nozzle vane insert and methods of installation  

SciTech Connect

A pair of hollow elongated insert bodies are disposed in one or more of the nozzle vane cavities of a nozzle stage of a gas turbine. Each insert body has an outer wall portion with apertures for impingement-cooling of nozzle wall portions in registration with the outer wall portion. The insert bodies are installed into the cavity separately and spreaders flex the bodies toward and to engage standoffs against wall portions of the nozzle whereby the designed impingement gap between the outer wall portions of the insert bodies and the nozzle wall portions is achieved. The spreaders are secured to the inner wall portions of the insert bodies and the bodies are secured to one another and to the nozzle vane by welding or brazing.

Miller, William John (Simpsonville, SC); Predmore, Daniel Ross (Clifton Park, NY); Placko, James Michael (West Chester, OH)

2002-01-01T23:59:59.000Z

433

Information handbook on independent spent fuel storage installations  

Science Conference Proceedings (OSTI)

In this information handbook, the staff of the U.S. Nuclear Regulatory Commission describes (1) background information regarding the licensing and history of independent spent fuel storage installations (ISFSIs), (2) a discussion of the licensing process, (3) a description of all currently approved or certified models of dry cask storage systems (DCSSs), and (4) a description of sites currently storing spent fuel in an ISFSI. Storage of spent fuel at ISFSIs must be in accordance with the provisions of 10 CFR Part 72. The staff has provided this handbook for information purposes only. The accuracy of any information herein is not guaranteed. For verification or for more details, the reader should refer to the respective docket files for each DCSS and ISFSI site. The information in this handbook is current as of September 1, 1996.

Raddatz, M.G.; Waters, M.D.

1996-12-01T23:59:59.000Z

434

Modlisation, simulation et contrle des installations cryogniques du CERN  

E-Print Network (OSTI)

Cette thse prsente le dveloppement d'un simulateur de processus cryogniques de grande taille appliqu aux installations cryogniques de l'acclrateur de particules LHC (Large Hadron Collider) au CERN (Organisation Europenne pour la Recherche Nuclaire). Ce simulateur est bas sur une approche de modlisation oriente objet o chaque quipement (changeur, turbine, compresseur, etc.) est reprsent partir d'un ensemble d'quations physiques algbro-diffrentielles. L'architecture de contrle du CERN est galement simule en intgrant le contrle ralis par des automates programmables (PLC) avec le systme de supervision. Ce simulateur t dvelopp pour servir diffrents desseins comme l'entranement des oprateurs, la vrification des programmes automates (virtual commissioning) et l'optimisation des stratgies de contrle. Le systme cryognique d'un dtecteur de particules (CMS) a d'abord t simul pour valider les modles, puis un liqufacteur d'...

Bradu, Benjamin; Gayet, P

2010-01-01T23:59:59.000Z

435

Proceedings of the 1st Installation Waste to Energy Workshop  

E-Print Network (OSTI)

Approved for public release; distribution is unlimited. Prepared for U.S. Army Corps of Engineers Washington, DC 20314-1000ERDC/CERL TR-08-11 ii Abstract: This first-ever waste to energy (WTE) workshop gathered Army environmental and energy subject matter experts to explore WTE at the installation and forward operating level. Historically, the Army environmental community has focused on solid waste disposal and the energy community on energy efficiency and power delivery, with no orchestrated integration of the two. The Energy Branch of the U.S. Army Engineer Research and Development Center, Construction Engineering Research Laboratory has been investigating WTE opportunities, and has found little Army analysis on WTE system providers many claims. The goals of this workshop were to share information, spread visibility on

Franklin H. Holcomb; Ren S. Parker; Thomas J. Hartranft; Kurt Preston; Harold R. Sanborn; Philip J. Darcy; Franklin H. Holcomb; Ren S. Parker; Thomas J. Hartranft; Kurt Preston; Harold R. Sanborn; Philip J. Darcy

2008-01-01T23:59:59.000Z

436

PC-1D installation manual and user's guide  

DOE Green Energy (OSTI)

PC-1D is a software package for personal computers that uses finite-element analysis to solve the fully-coupled two-carrier semiconductor transport equations in one dimension. This program is particularly useful for analyzing the performance of optoelectronic devices such as solar cells, but can be applied to any bipolar device whose carrier flows are primarily one-dimensional. This User's Guide provides the information necessary to install PC-1D, define a problem for solution, solve the problem, and examine the results. Example problems are presented which illustrate these steps. The physical models and numerical methods utilized are presented in detail. This document supports version 3.1 of PC-1D, which incorporates faster numerical algorithms with better convergence properties than previous versions of the program. 51 refs., 17 figs., 5 tabs.

Basore, P.A.

1991-05-01T23:59:59.000Z

437

Luminant Martin Lake Unit 3 Intelligent Sootblowing Test Report  

Science Conference Proceedings (OSTI)

A Clyde Bergemann Intelligent Sootblowing (ISB) system was recently installed at Luminant's Martin Lake Unit 3. This report compares the performance of the new ISB system to that of the previous boiler cleaning control system. Criteria monitored during the test included overall heat flux, cleanliness factors from thermodynamic modeling, ash weight, emissions, gas temperatures, and the number of daily sootblower and wallblower operations.

2009-05-01T23:59:59.000Z

438

Eight evacuated collector installations. Interim report for the IEA task on the performance of solar heating, cooling and hot water systems using evacuated collectors  

SciTech Connect

The cooperative IEA task on evacuated collector systems includes the following research and development projects: solar heated and cooled single family residences in Japan and the USA, a solar heated single family residence in the Netherlands, a solar heated multi-family unit in West Germany, a solar test facility in the United Kingdom, solar heated and cooled offices in Australia, a solar heated and cooled laboratory in Italy, an industrial process heat application in Canada, a solar heated and cooled university building in the USA and district heating systems in Sweden and Switzerland. The task covers the important evacuated collector applications. The same collectors are used in several installations and nearly all currently available evacuated collectors are used in at least one installation. Exchange of performance results within the task has been greatly enhanced by adoption of a mandatory highly prescriptive common reporting structure. Detailed unambiguous performance comparisons are made which would otherwise be difficult or impractical. This report, the first in a series of reports that will be published through 1986, describes the system and climate at eight of the installations and illustrates and compares seasonal, monthly, daily and hourly performance of the installations in Japan, Sweden, the USA and West Germany.

Duff, W.S.

1982-11-01T23:59:59.000Z

439

Analysis and Design of a High Power Density Axial Flux Permanent Magnet Linear Synchronous Machine Used for Stirling System  

Science Conference Proceedings (OSTI)

a high power density axial flux permanent magnet linear synchronous machine and the stirling system will be introduced. This machine is a tubular axial flux permanent magnet machine. It comprises two parts: stator and mover. With the 2D finite-element ... Keywords: permanent magnet, stirling engine, linear motor

Ping Zheng; Xuhui Gan; Lin Li

2010-09-01T23:59:59.000Z

440

296 IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, VOL. 57, NO. 1, JANUARY 2010 Very-High-Speed Slotless Permanent-Magnet  

E-Print Network (OSTI)

-High-Speed Slotless Permanent-Magnet Motors: Analytical Modeling, Optimization, Design, and Torque Measurement Methods-high-speed (VHS) slotless permanent-magnet motor design procedure using an analytical model. The model is used TO THEIR high power density, very-high-speed (VHS) permanent-magnet (PM) motors are increasingly requested

Psaltis, Demetri

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

This paper describes the integrated modeling of a permanent magnet (PM) motor used in an electromechanical actuator  

E-Print Network (OSTI)

ABSTRACT This paper describes the integrated modeling of a permanent magnet (PM) motor used and Field Oriented Control of Permanent Magnet (PM) Motor for High Performance EMA 2010-01-1742 Published 11 of a permanent magnet motor and describes both the control and thermal performance of the motor in following

Wu, Shin-Tson

442

IEEE TRANSACTIONS ON MAGNETICS, VOL. 41, NO. 10, OCTOBER 2005 3823 Design of a Superhigh-Speed Cryogenic Permanent  

E-Print Network (OSTI)

-Speed Cryogenic Permanent Magnet Synchronous Motor Liping Zheng1, Thomas X. Wu1, Dipjyoti Acharya2, Kalpathy B and simulation of a superhigh-speed permanent magnet synchronous motor (PMSM) that operates in the cryogenic Terms--Cryogenics, permanent magnet synchronous motor (PMSM), superhigh speed, V/f control. I

Wu, Shin-Tson

443

220,000-r/min, 2-kW Permanent Magnet Motor Drive for Turbocharger Toshihiko Noguchi, Yosuke Takata *  

E-Print Network (OSTI)

220,000-r/min, 2-kW Permanent Magnet Motor Drive for Turbocharger Toshihiko Noguchi, Yosuke Takata-speed permanent-magnet synchronous motor drive, which is embedded in a turbocharger of an internal permanent magnet. Also, it is indispensable to reduce the motor inductance less than 10 (µH) because dc bus

Fujimoto, Hiroshi

444

Power-Factor and Torque Calculation with Consideration of Cross Saturation of the Interior Permanent Magnet Synchronous Motor with  

E-Print Network (OSTI)

Permanent Magnet Synchronous Motor with Brushless Field Excitation Seong Taek Lee1,2 , Timothy A. Burress1 permanent magnet synchronous motor (IPMSM). The conventional two-axis IPMSM model is modified to include motor of a hybrid electric vehicle. I. INTRODUCTION The interior permanent magnet synchronous motor

Tolbert, Leon M.

445

An Analytical Equation for Cogging Torque Calculation in Permanent Magnet Motors Lu, Kaiyuan; Rasmussen, Peter Omand; Ritchie, Andrew Ewen  

E-Print Network (OSTI)

An Analytical Equation for Cogging Torque Calculation in Permanent Magnet Motors Lu, Kaiyuan Torque Calculation in Permanent Magnet Motors. Paper presented at 17th International Conference to the prediction of the cogging torque in motors with parallel or radial magnetized permanent magnets. The magnetic

Rasmussen, Peter Omand

446

Design and analysis of a permanent magnet generator for naval applications  

E-Print Network (OSTI)

This paper discusses the electrical and magnetic design and analysis of a permanent magnet generation module for naval applications. Numerous design issues are addressed and several issues are raised about the potential ...

Rucker, Jonathan E. (Jonathan Estill)

2005-01-01T23:59:59.000Z

447

EA-1895: Lolo Creek Permanent Weir Construction near town of Weippe,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Lolo Creek Permanent Weir Construction near town of 5: Lolo Creek Permanent Weir Construction near town of Weippe, Clearwater County, Idaho EA-1895: Lolo Creek Permanent Weir Construction near town of Weippe, Clearwater County, Idaho Summary DOE's Bonneville Power Administration is preparing this EA to evaluate the potential environmental impacts of replacing an existing seasonal fish weir with a permanent weir, which would be used to monitor federally-listed Snake River steelhead and collect spring Chinook salmon adults to support ongoing supplementation programs in the watershed. The Bureau of Land Management, a cooperating agency, preliminarily determined Lolo Creek to be suitable for Congressional designation into the Wild and Scenic River System. The EA includes a Wild and Scenic River Section 7 analysis.

448

Statement of Secretaries Salazar and Chu on the Permanent Plugging of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Secretaries Salazar and Chu on the Permanent Plugging Secretaries Salazar and Chu on the Permanent Plugging of Macondo well Statement of Secretaries Salazar and Chu on the Permanent Plugging of Macondo well September 19, 2010 - 12:00am Addthis WASHINGTON, DC - Secretary of the Interior Ken Salazar and Energy Secretary Steven Chu today issued the following statement regarding the permanent plugging of BP's Macondo well. "With the successful first intercept by the relief well and our confirmation through pressure tests that the cement plugs are secure, we can now declare BP's Macondo well effectively dead. At the direction of President Obama and under the leadership of National Incident Commander Thad Allen, we have worked tirelessly and relentlessly as a US Team to reach this point and to provide oversight and direction to the source

449

DOE-Sponsored Field Test Finds Potential for Permanent Storage of CO2 in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Field Test Finds Potential for Permanent Storage of Field Test Finds Potential for Permanent Storage of CO2 in Lignite Seams DOE-Sponsored Field Test Finds Potential for Permanent Storage of CO2 in Lignite Seams November 4, 2010 - 1:00pm Addthis Washington, DC - A field test sponsored by the U.S. Department of Energy (DOE) has demonstrated that opportunities to permanently store carbon in unmineable seams of lignite may be more widespread than previously documented. This finding supports national efforts to address climate change through long-term storage of CO2 in underground geologic reservoirs. Lowering the core barrel at the PCOR Partnership lignite site.The PCOR Partnership, one of seven partnerships in DOE's Regional Carbon Sequestration Partnership Program, collaborated with Eagle Operating Inc. (Kenmare, N.D.) to complete the field test in Burke County, N.D. In March

450

Fabrication and Performance of Silicon-Embedded Permanent-Magnet Microgenerators  

E-Print Network (OSTI)

This paper focuses on the design, fabrication, and characterization of silicon-packaged permanent-magnet (PM) microgenerators. The use of silicon packaging favors fine control on shape and dimensions in batch fabrication ...

Herrault, Florian

451

Prospects for Non-Rare Earth Permanent Magnets for Traction Motors and Generators  

Science Conference Proceedings (OSTI)

With the advent of high-flux density permanent magnets based on rare earth elements such as neodymium (Nd) in the 1980s, permanent magnet-based electric machines had a clear performance and cost advantage over induction machines when weight and size were factors such as in hybrid electric vehicles and wind turbines. However, the advantages of the permanent magnet-based electric machines may be overshadowed by supply constraints and high prices of their key constituents, rare earth elements, which have seen nearly a 10-fold increase in price in the last 5 years and the imposition of export limits by the major producing country, China, since 2010. We outline the challenges, prospects, and pitfalls for several potential alloys that could replace Nd-based permanent magnets with more abundant and less strategically important elements.

Kramer, Matthew; McCallum, Kendall; Anderson, Iver; Constantinides, Steven

2012-06-29T23:59:59.000Z

452

Experimental verification for the design of a doubly-fed permanent magnetic generator  

E-Print Network (OSTI)

This is a continuous work on the project of a doubly-fed permanent magnet (DFPM) generator for wind turbines. The construction of a prototype machine was finally finished and experiments were conducted to verify the design ...

Lu, Bin, Ph. D. Massachusetts Institute of Technology

2007-01-01T23:59:59.000Z

453

Wind Power Price Trends in the United States: Struggling to Remain Competitive in the Face of Strong Growth  

E-Print Network (OSTI)

Build a Durable Market for Wind Power in the United StatesLearning Curves for Wind Power. Energy Policy, 30: 1181-Annual Report on U.S. Wind Power Installation, Cost, and

Bolinger, Mark A

2009-01-01T23:59:59.000Z

454

A design for improved performance of interior permanent magnet synchronous motor for hybrid electric vehicle  

Science Conference Proceedings (OSTI)

This paper investigates the layout of a magnet shape on the performance of an interior permanent magnet (IPM) synchronous motor. The motor is used in a hybrid electric vehicle. The IPM motor is a pancake shaped motor that has permanent magnets inside the rotor. The motor acts as a rotational electrodynamic machine between the engine and transmission. The main purpose of redesigning the shape of the magnet is to improve the motor performance

Seong Yeop Lim

2006-01-01T23:59:59.000Z

455

Photovoltaics Design and Installation Manual | Open Energy Information  

Open Energy Info (EERE)

Photovoltaics Design and Installation Manual Photovoltaics Design and Installation Manual Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Photovoltaics Design and Installation Manual Agency/Company /Organization: Solar Energy International Sector: Energy Focus Area: Renewable Energy, Solar, - Solar PV Resource Type: Training materials User Interface: Other Website: www.solarenergy.org/bookstore/photovoltaics-design-installation-manual Cost: Paid Language: "English, Spanish; Castilian" is not in the list of possible values (Abkhazian, Achinese, Acoli, Adangme, Adyghe; Adygei, Afar, Afrihili, Afrikaans, Afro-Asiatic languages, Ainu, Akan, Akkadian, Albanian, Aleut, Algonquian languages, Altaic languages, Amharic, Angika, Apache languages, Arabic, Aragonese, Arapaho, Arawak, Armenian, Aromanian; Arumanian; Macedo-Romanian, Artificial languages, Assamese, Asturian; Bable; Leonese; Asturleonese, Athapascan languages, Australian languages, Austronesian languages, Avaric, Avestan, Awadhi, Aymara, Azerbaijani, Balinese, Baltic languages, Baluchi, Bambara, Bamileke languages, Banda languages, Bantu (Other), Basa, Bashkir, Basque, Batak languages, Beja; Bedawiyet, Belarusian, Bemba, Bengali, Berber languages, Bhojpuri, Bihari languages, Bikol, Bini; Edo, Bislama, Blin; Bilin, Blissymbols; Blissymbolics; Bliss, Bosnian, Braj, Breton, Buginese, Bulgarian, Buriat, Burmese, Caddo, Catalan; Valencian, Caucasian languages, Cebuano, Celtic languages, Central American Indian languages, Central Khmer, Chagatai, Chamic languages, Chamorro, Chechen, Cherokee, Cheyenne, Chibcha, Chichewa; Chewa; Nyanja, Chinese, Chinook jargon, Chipewyan; Dene Suline, Choctaw, Chuukese, Chuvash, Classical Newari; Old Newari; Classical Nepal Bhasa, Classical Syriac, Coptic, Cornish, Corsican, Cree, Creek, Creoles and pidgins , Crimean Tatar; Crimean Turkish, Croatian, Cushitic languages, Czech, Dakota, Danish, Dargwa, Delaware, Dinka, Divehi; Dhivehi; Maldivian, Dogri, Dogrib, Dravidian languages, Duala, Dutch; Flemish, Dyula, Dzongkha, Eastern Frisian, Efik, Egyptian (Ancient), Ekajuk, Elamite, English, Erzya, Esperanto, Estonian, Ewe, Ewondo, Fang, Fanti, Faroese, Fijian, Filipino; Pilipino, Finnish, Finno-Ugrian languages, Fon, French, Friulian, Fulah, Ga, Gaelic; Scottish Gaelic, Galibi Carib, Galician, Ganda, Gayo, Gbaya, Geez, Georgian, German, Germanic languages, Gilbertese, Gondi, Gorontalo, Gothic, Grebo, Greek, Modern, Guarani, Gujarati, Gwich'in, Haida, Haitian; Haitian Creole, Hausa, Hawaiian, Hebrew, Herero, Hiligaynon, Himachali languages; Western Pahari languages, Hindi, Hiri Motu, Hittite, Hmong; Mong, Hungarian, Hupa, Iban, Icelandic, Ido, Igbo, Ijo languages, Iloko, Inari Sami, Indic languages, Indo-European languages, Indonesian, Ingush, Interlingue; Occidental, Inuktitut, Inupiaq, Iranian languages, Irish, Iroquoian languages, Italian, Japanese, Javanese, Judeo-Arabic, Judeo-Persian, Kabardian, Kabyle, Kachin; Jingpho, Kalaallisut; Greenlandic, Kalmyk; Oirat, Kamba, Kannada, Kanuri, Kara-Kalpak, Karachay-Balkar, Karelian, Karen languages, Kashmiri, Kashubian, Kawi, Kazakh, Khasi, Khoisan languages, Khotanese; Sakan, Kikuyu; Gikuyu, Kimbundu, Kinyarwanda, Kirghiz; Kyrgyz, Klingon; tlhIngan-Hol, Komi, Kongo, Konkani, Korean, Kosraean, Kpelle, Kru languages, Kuanyama; Kwanyama, Kumyk, Kurdish, Kurukh, Kutenai, Ladino, Lahnda, Lamba, Land Dayak languages, Lao, Latin, Latvian, Lezghian, Limburgan; Limburger; Limburgish, Lingala, Lithuanian, Lojban, Lower Sorbian, Lozi, Luba-Katanga, Luba-Lulua, Luiseno, Lule Sami, Lunda, Luo (Kenya and Tanzania), Lushai, Luxembourgish; Letzeburgesch, Macedonian, Madurese, Magahi, Maithili, Makasar, Malagasy, Malay, Malayalam, Maltese, Manchu, Mandar, Mandingo, Manipuri, Manobo languages, Manx, Maori, Mapudungun; Mapuche, Marathi, Mari, Marshallese, Marwari, Masai, Mayan languages, Mende, Mi'kmaq; Micmac, Minangkabau, Mirandese, Mohawk, Moksha, Mon-Khmer languages, Mongo, Mongolian, Mossi, Multiple languages, Munda languages, N'Ko, Nahuatl languages, Nauru, Navajo; Navaho, Ndebele, North; North Ndebele, Ndebele, South; South Ndebele, Ndonga, Neapolitan, Nepal Bhasa; Newari, Nepali, Nias, Niger-Kordofanian languages, Nilo-Saharan languages, Niuean, North American Indian languages, Northern Frisian, Northern Sami, Norwegian, Nubian languages, Nyamwezi, Nyankole, Nyoro, Nzima, Occitan (post 1500); Provençal, Ojibwa, Oriya, Oromo, Osage, Ossetian; Ossetic, Otomian languages, Pahlavi, Palauan, Pali, Pampanga; Kapampangan, Pangasinan, Panjabi; Punjabi, Papiamento, Papuan languages, Pedi; Sepedi; Northern Sotho, Persian, Philippine languages, Phoenician, Pohnpeian, Polish, Portuguese, Prakrit languages, Pushto; Pashto, Quechua, Rajasthani, Rapanui, Rarotongan; Cook Islands Maori, Romance languages, Romanian; Moldavian; Moldovan, Romansh, Romany, Rundi, Russian, Salishan languages, Samaritan Aramaic, Sami languages, Samoan, Sandawe, Sango, Sanskrit, Santali, Sardinian, Sasak, Scots, Selkup, Semitic languages, Serbian, Serer, Shan, Shona, Sichuan Yi; Nuosu, Sicilian, Sidamo, Sign Languages, Siksika, Sindhi, Sinhala; Sinhalese, Sino-Tibetan languages, Siouan languages, Skolt Sami, Slave (Athapascan), Slavic languages, Slovak, Slovenian, Sogdian, Somali, Songhai languages, Soninke, Sorbian languages, Sotho, Southern, South American Indian (Other), Southern Altai, Southern Sami, Spanish; Castilian, Sranan Tongo, Sukuma, Sumerian, Sundanese, Susu, Swahili, Swati, Swedish, Swiss German; Alemannic; Alsatian, Syriac, Tagalog, Tahitian, Tai languages, Tajik, Tamashek, Tamil, Tatar, Telugu, Tereno, Tetum, Thai, Tibetan, Tigre, Tigrinya, Timne, Tiv, Tlingit, Tok Pisin, Tokelau, Tonga (Nyasa), Tonga (Tonga Islands), Tsimshian, Tsonga, Tswana, Tumbuka, Tupi languages, Turkish, Turkmen, Tuvalu, Tuvinian, Twi, Udmurt, Ugaritic, Uighur; Uyghur, Ukrainian, Umbundu, Uncoded languages, Undetermined, Upper Sorbian, Urdu, Uzbek, Vai, Venda, Vietnamese, Volapük, Votic, Wakashan languages, Walamo, Walloon, Waray, Washo, Welsh, Western Frisian, Wolof, Xhosa, Yakut, Yao, Yapese, Yiddish, Yoruba, Yupik languages, Zande languages, Zapotec, Zaza; Dimili; Dimli; Kirdki; Kirmanjki; Zazaki, Zenaga, Zhuang; Chuang, Zulu, Zuni) for this property.

456

Great Plaines installs directionally drilled crossings in Texas  

SciTech Connect

This paper reports on installing a five- line wide, one-line long products system for ARCO Pipe Line Co. (APLC) in a crowded utility right of way required Great Plains Pipeline Construction Co. to complete three directionally drilled crossings and over 50 conventional bored crossings in the Channelview, Texas area. The pipe line route closely parallels a 4-mi ROW section of Houston Power and Light Co. (HP and L) and about 4 mi of Union Pacific Railroad tracks. Due to overhead towers carrying high-voltage electric transmission lines, Great Plains bored under the existing towers in HP and L's easement to preserve the right of way for future tower expansion. Laney, Inc., subcontracted the conventional bores underneath towers and minor roads. Laney Directional Drilling Co. was the prime contractor for two horizontal directionally drilled crossings of the Houston Ship Channel and Carpenter's Bayou. Great Plains, with its own crew, completed three roadway crossings in high-traffic areas. Engineering and material procurement was handled by APLC.

Thiede, K.L.

1991-09-01T23:59:59.000Z

457

Integrated dynamic landscape analysis and modeling system (IDLAMS) : installation manual.  

SciTech Connect

The Integrated Dynamic Landscape Analysis and Modeling System (IDLAMS) is a prototype, integrated land management technology developed through a joint effort between Argonne National Laboratory (ANL) and the US Army Corps of Engineers Construction Engineering Research Laboratories (USACERL). Dr. Ronald C. Sundell, Ms. Pamela J. Sydelko, and Ms. Kimberly A. Majerus were the principal investigators (PIs) for this project. Dr. Zhian Li was the primary software developer. Dr. Jeffrey M. Keisler, Mr. Christopher M. Klaus, and Mr. Michael C. Vogt developed the decision analysis component of this project. It was developed with funding support from the Strategic Environmental Research and Development Program (SERDP), a land/environmental stewardship research program with participation from the US Department of Defense (DoD), the US Department of Energy (DOE), and the US Environmental Protection Agency (EPA). IDLAMS predicts land conditions (e.g., vegetation, wildlife habitats, and erosion status) by simulating changes in military land ecosystems for given training intensities and land management practices. It can be used by military land managers to help predict the future ecological condition for a given land use based on land management scenarios of various levels of training intensity. It also can be used as a tool to help land managers compare different land management practices and further determine a set of land management activities and prescriptions that best suit the needs of a specific military installation.

Li, Z.; Majerus, K. A.; Sundell, R. C.; Sydelko, P. J.; Vogt, M. C.

1999-02-24T23:59:59.000Z

458

Resource Form Factor and Installation of GFA Controllers  

SciTech Connect

The focus of this task is to optimize the form and placement of a controller comprising the Grid Friendly appliance (GFA) controller, power supply and power relay (and/or a solid-state power electronic switch) that would command a domestic water heater to shed its load in response to stress on the electric power grid. The GFA controller would disconnect the water heater from its supply circuit whenever it senses a low voltage signal or other indicators of system stress communicated via the electric power distribution system. Power would be reconnected to the appliance when the GFA controller senses the absence of these signals. This project has also considered more frequent cycling of this controllers relay switch to perform demand-side frequency regulation. The principal criteria considered in this optimization are reliability, cost and life expectancy of the GFA components. The alternative embodiments of the GFA equipment under consideration are: Option 1- installation inside the insulation space of the water heater between the tank and jacket Option 2 containment in a separate nearby electrical enclosure Option 3 - as a modification or adjunct to the distribution panel housing and/or the breaker that protects the water heater supply circuit.

DeSteese, John G.; Hammerstrom, Donald J.

2009-11-15T23:59:59.000Z

459

Solar heating system installed at Stamford, CT. Final report  

DOE Green Energy (OSTI)

Information is provided on the solar heating system installed at the Lutz-Sotire Partnership Executive East Office Building, Stamford, Connecticut. The information consists of description of system and components, operation and maintenance manual, as-built drawings and manufacturer's component data. The solar system was designed to provide approximately 50 percent of the heating requirements. The solar facility has 2,561 sq. ft. of liquid flat plate collectors and a 6000 gallon, stone lined, well-insulated storage tank. Freeze protection is provided by a 50 percent glycol/water mixture in the collector loop. From the storage tank, solar heated water is fed into the building's distributed heat pump loop via a modulating three-way valve. If the storage tank temperature drops below 80/sup 0/F, the building loop may be supplied from the existing electrical hot water boilers. The Executive East Office Building is of moderate size, 25,000 sq. ft. of heated space in 2 1/2 stories. The solar system makes available for other users up to 150 KVA of existing electrical generating capacity.

Not Available

1979-09-01T23:59:59.000Z

460

Demonstration of a Last Field Wet ESP Conversion -- Installation Summary  

Science Conference Proceedings (OSTI)

This report describes the conversion of the electrostatic precipitator (ESP) on Unit 3 at Mirant's (formerly Potomac Electric Power Company's) Dickerson Generating Station to hybrid, dry-wet operation. This Tailored Collaboration project was undertaken to determine, at full scale, if the conversion of a single field of a conventional dry ESP to wet operation could significantly reduce particulate emissions and provide reliable operation with an acceptable level of maintenance. Specifically, the performan...

2001-02-27T23:59:59.000Z

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Evaluation of the Stretford Unit at the Great Plains Coal Gasification Plant  

SciTech Connect

This report gives the results of an evaluation of the design and operational characteristics of the Stretford Sulfur Recovery Unit installed in the Great Plains Gasification Project, Beulah, North Dakota. The report contains discussion of the H/sub 2/S removal capability of the unit, the potential of solids deposition and the expected solution losses. 11 refs., 7 figs., 2 tabs.

Lang, R.A.

1984-12-01T23:59:59.000Z

462

Research on Fault Diagnosis of Hydropower Unit Based on Expert System and Hybrid Reasoning  

Science Conference Proceedings (OSTI)

With the rapid development of computer and monitoring technologies in recent years, more and more online monitoring equipment of hydropower units have been installed and applied in hydropower plants, and so began the long-term accumulation of data. Although ... Keywords: fault diagnosis, hydropower unit, expert system, hybrid reasoning

Ye Zhou; Luoping Pan

2012-05-01T23:59:59.000Z

463

Nomination Form DEPARTMENT / UNIT  

E-Print Network (OSTI)

Nomination Form DEPARTMENT / UNIT: CAMPUS ADDRESS: CLASSIFICATION / TITLE: DEPARTMENT EMAIL ADDRESS: DEPARTMENT TELEPHONE: 2011 FRANKLIN STAFF SERVICE AWARDS START DATE IN DEPARTMENT / UNIT: ACTUAL NUMBER MEMBER DEADLINE: FRIDAY MARCH 4, 2011 ADDITIONAL COMMENTS: Signature of Head / Director of Nominee's Unit

Arnold, Jonathan

464

Unit Outline Training Guide  

E-Print Network (OSTI)

Unit Outline Builder Training Guide Document Status: Final Revision Number: 6.0 Revision Date: 14 Approved #12;Online Unit Outline Builder Training Guide Curtin University of Technology Page 2 TABLE................................................................................................................. 4 4. Log in and Select a Unit Outline

465

Nomination Form DEPARTMENT / UNIT  

E-Print Network (OSTI)

Nomination Form DEPARTMENT / UNIT: CAMPUS ADDRESS: CLASSIFICATION / TITLE: DEPARTMENT EMAIL ADDRESS: DEPARTMENT TELEPHONE: 2013 FRANKLIN STAFF SERVICE AWARDS START DATE IN DEPARTMENT / UNIT: ACTUAL NUMBER MEMBER DEADLINE: MARCH 5, 2013 ADDITIONAL COMMENTS: Signature of Head / Director of Nominee's Unit

Arnold, Jonathan

466

Nomination Form DEPARTMENT / UNIT  

E-Print Network (OSTI)

Nomination Form DEPARTMENT / UNIT: CAMPUS ADDRESS: CLASSIFICATION / TITLE: DEPARTMENT EMAIL ADDRESS: DEPARTMENT TELEPHONE: 2012 FRANKLIN STAFF SERVICE AWARDS START DATE IN DEPARTMENT / UNIT: ACTUAL NUMBER MEMBER DEADLINE: FRIDAY MARCH 2, 2012 ADDITIONAL COMMENTS: Signature of Head / Director of Nominee's Unit

Arnold, Jonathan

467

Nomination Form DEPARTMENT / UNIT  

E-Print Network (OSTI)

Nomination Form DEPARTMENT / UNIT: CAMPUS ADDRESS: CLASSIFICATION / TITLE: DEPARTMENT EMAIL ADDRESS: DEPARTMENT TELEPHONE: 2014 FRANKLIN STAFF SERVICE AWARDS START DATE IN DEPARTMENT / UNIT: ACTUAL NUMBER MEMBER DEADLINE: MARCH 7, 2014 ADDITIONAL COMMENTS: Signature of Head / Director of Nominee's Unit

Arnold, Jonathan

468

Model for determining modular heat recovery incinerator feasibility on air force installations. Master's thesis  

Science Conference Proceedings (OSTI)

This study constructed a model to determine the feasibility of building municipal solid waste (MSW) fired modular heat recovery incinerators (HRIs) on Air Force installations. The model consisted of three gates. Gate one identified current federal regulatory air emission requirements for various HRI pollutants. It also specified two air pollution control configurations with emission reduction efficiencies capable of achieving these requirements. Gate two presented a life-cycle cost (LCC) economic analysis methodology. Operational and cost data for existing modular HRIs located in the United States facilitated the development of regression equations that estimate capital and annual operating costs for a modular HRI. Actual cost and operational information from a central heating plant at Wright-Patterson AFB, along with cost data from the regression equations, provided the basis for an example LCC analysis involving modular HRIs Results of this hypothetical evaluation showed that the LCC for the modular HRI alternatives were both less than the LCC of replacing the existing boiler. Gate three presented a Likert-scale survey to evaluate the sociopolitical acceptability of the proposed HRI. The survey results indicate the level of effort to process the HRI proposal in accordance with the National Environmental Policy Act. Heat recovery, Incinerators, Waste management, Waste treatment.

Anderson, A.H.; Munnell, P.R.

1992-09-01T23:59:59.000Z

469

EnergyUnited - Residential Energy Efficient Heat Pump Rebate Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EnergyUnited - Residential Energy Efficient Heat Pump Rebate EnergyUnited - Residential Energy Efficient Heat Pump Rebate Program EnergyUnited - Residential Energy Efficient Heat Pump Rebate Program < Back Eligibility Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heat Pumps Maximum Rebate 2 per dwelling Program Info State North Carolina Program Type Utility Rebate Program Rebate Amount Heat Pumps (14 SEER): $150 Heat Pumps (15 SEER +): $300 Provider EnergyUnited EnergyUnited offers rebates to residential customers who upgrade to high efficiency heat pumps. Rebates range from $150 - $300, varying by efficiency. The rebate form can be found on the program website and must be completed by the installing HVAC contractor. Each unit will require a separate form in order to qualify for rebates. Systems must be

470

Factors affecting the permanence of livestock projects undertaken by Heifer International-Mexico  

E-Print Network (OSTI)

Heifer International-Mexico (HI-M), a hunger-relieving non-profit organization, collaborates with the Direccin? General de Educacin? Tecnolg?ica Agropecuaria-Durango (DGETA) to establish livestock projects involving resource-poor families in the state of Durango, Mexico. This study identified and analyzed the factors affecting the permanence of hog and dairy cow projects in four communities in the state of Durango, Mexico. The researcher interviewed seven project managers and 35 beneficiaries to identify the factors affecting the permanence of livestock projects. From their responses, the researcher developed a list of 22 factors that promoted the permanence of the livestock projects. Key points included personal interaction between beneficiaries in the group(s) and project manager(s), knowledge and skills obtained from workshops, and household economics. The researcher developed a separate list of 20 factors that inhibited the permanence of the livestock projects. Key points included difficulties in livestock production and poor personal interaction and communication between beneficiaries and project managers. Two diagrams illustrate the commonalities and differences advocated by the two groups for both lists. Beneficiaries and project managers shared eight of the 14 factors advocated to promote the permanence of livestock projects. Beneficiaries had four factors unique to their group and the project managers had two factors unique to their group. Beneficiaries and project managers shared seven of the 13 factors advocated to inhibit the permanence of livestock projects. Four factors were unique to beneficiaries while two factors were unique to project managers. The researcher used a force field analysis based concept labeled the "line of permanence," to illustrate the factors affecting the permanence of HI-M's livestock projects in the communities. Community A was the only location where the interviewees identified more factors inhibiting the permanence of a livestock project. Community A was also the only community that no longer had animals HI-M donated to the community. In contrast to Community A, project managers and beneficiaries in Communities A, B, and C each identified more factors that promoted the permanence of the livestock projects. The author made recommendations based on the findings of the study for HI-M and DGETA to improve the manner by which they undertake livestock projects.

Arispe, Sergio Adrian

2003-01-01T23:59:59.000Z

471

Sundance, Skiing and Solar: Park City to Install New PV System | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sundance, Skiing and Solar: Park City to Install New PV System Sundance, Skiing and Solar: Park City to Install New PV System Sundance, Skiing and Solar: Park City to Install New PV System October 25, 2010 - 10:49am Addthis Park City, UT has completed several green projects recently. The town is installing a solar energy system on top of the Marsac Building at the end of the month. | Photo courtesy of Park City | Park City, UT has completed several green projects recently. The town is installing a solar energy system on top of the Marsac Building at the end of the month. | Photo courtesy of Park City | Paul Lester Communications Specialist for the Office of Energy Efficiency and Renewable Energy What does this project do? 80-panel solar energy system to be installed at Park City's Marsac Building. Recovery Act-funded system to generate up to 15% of the building's

472

Obama Administration Announces Plans to Install New Solar Panels on the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Announces Plans to Install New Solar Panels on Announces Plans to Install New Solar Panels on the White House Residence Obama Administration Announces Plans to Install New Solar Panels on the White House Residence October 5, 2010 - 12:00am Addthis WASHINGTON - U.S. Energy Secretary Steven Chu and Council of Environmental Quality (CEQ) Chair Nancy Sutley today announced plans to install solar panels and a solar hot water heater on the roof of the White House Residence. These two solar installations will be part of a Department of Energy demonstration project showing that American solar technologies are available, reliable, and ready for installation in homes throughout the country. Secretary Chu and Chair Sutley made the announcement during CEQ's 2010 GreenGov Symposium, which is bringing together leaders from Federal,

473

This Flash transmits the second installment under this project. Additional insta  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This Flash transmits the second installment under this project. Additional installments This Flash transmits the second installment under this project. Additional installments will follow as they are completed. There are two significant chapter revisions in this installment: 6.1, Competition; and 35.1, Scientific and Technical Information. There are also five primarily editorial chapter revisions in this installment, though the revisions include some updated materials as well: 17.2, Cost Participation; 17.4 Program Opportunity Notices; 17.5 Program Research and Development Notices; 22.1, Labor Standards for Construction; and 47.1, Transportation - Air Charter. Finally, three chapters have been removed. Chapter 45, Government Property, was removed because the coverage was obsolete. Chapter 70.1, Cost Participation, was removed because it was duplicative of 17.2 and inappropriate in

474

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network (OSTI)

Energy Grant Program MSEO Solar Electric Rebate Program NHPUC Renewable Energy Rebate Program NJCEP Customer Onsite Renewable Energy (CORE) Program NJ

Barbose, Galen

2011-01-01T23:59:59.000Z

475

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network (OSTI)

VT Renewable Energy Incentive 10-100 kW Avg. Cost Programlevel cost data from Wisconsins Focus on Energy RenewableRenewable WI Energy Cash-Back Rewards 10-100 kW Avg. Cost

Barbose, Galen

2011-01-01T23:59:59.000Z

476

Liquid phase methanol process development unit: installation, operation, and support studies. Topical report. Experimental catalyst preparation program  

DOE Green Energy (OSTI)

This report details the preparation of 29 catalyst samples under DOE contract No. DE-AC22-81PC30019. These were selected for gas phase activity testing from a total of 70 prepared. Based on activity results, three compositions were selected for further slurry phase testing in the Chem Systems, Inc. (CSI) laboratories. 11 references, 5 figures, 7 tables.

Not Available

1984-01-01T23:59:59.000Z

477

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network (OSTI)

states Customer Onsite Renewable Energy (CORE) program and its successor, the Renewable Energy Incentiveincentives, requirements that electricity suppliers purchase a certain amount of solar energy, and federal and statestate agency PA programs**) SDF Solar PV Grant Program Austin Energy Power Saver Program TX IOU Solar Incentive

Barbose, Galen

2011-01-01T23:59:59.000Z

478

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network (OSTI)

100 kW ?10 kW DEP Sunshine Solar PV Program (and other stateElectric Program DEP Sunshine Solar PV Program (and otheragency programs**) SDF Solar PV Grant Program Austin Energy

Barbose, Galen

2011-01-01T23:59:59.000Z

479

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network (OSTI)

U.S. Solar Market Trends 2009. Interstate Renewable EnergyU.S. Solar Market Trends 2009. Interstate Renewable Energy

Barbose, Galen

2011-01-01T23:59:59.000Z

480

Expert Meeting Report: Achieving the Best Installed Performance from High-Efficiency Residential Gas Furnaces  

SciTech Connect

This report describes a Building America expert meeting hosted on July 28, 2011, by the Partnership for Advanced Residential Retrofit team. The purpose of this meeting was to identify installation practices that provide the best installed efficiency for residential gas furnaces, explain how AFUE and field efficiency can differ, and investigate the impact of installation practices on the efficiency and long-term durability of the furnace.

Brand, L.

2012-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "units permanently installed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Microsoft Word - NO-MM-827 New Orleans Emergency Generator Installation (900 building).docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MM-827 MM-827 Title: New Orleans Emergency Generator Installation (900 Building) Description: Subcontractor shall provide all labor, tools, materials, equipment, and supervision required to relocate the New Orleans emergency generator at the 900 building, to install a new Automatic Transfer Switch, and to provide generator status alarms. Tasks includes construction of a new concrete slab foundation, relocation of the existing portable generator from the trailer to the foundation, electrical installation of the generator, installation of fencing around the generator, and miscellaneous architectural work. Some of the existing equipment and components being dismantled, removed or demolished have been designated for government salvage. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021)

482

inverters, offering less weight, higher efficiency, and lower-cost installations.  

E-Print Network (OSTI)

to 10 pounds per square foot of dead weight to the roof structural members, concentrated throughinverters, offering less weight, higher efficiency, and lower- cost installations. The electrical

Johnson, Eric E.

483

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network (OSTI)

to Drive Wind Development. . . . . . . . . . . . . . .5 GE Wind Is the Dominant Turbine Manufacturer, with SiemensAnnual Report on U.S. Wind Power Installation, Cost, and

2008-01-01T23:59:59.000Z

484

Fiscal year 1996 well installation program summary, Y-12 Plant Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1996 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge Tennessee. Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Two groundwater monitoring wells were installed during the FY 1996 drilling program. One of the groundwater monitoring wells was installed in the Lake Reality area and was of polyvinyl chloride screened construction. The other well, installed near the Ash Disposal Basin, was of stainless steel construction.

NONE

1997-04-01T23:59:59.000Z

485

Deficiencies of Lighting Codes and Ordinances in Controlling Light Pollution from Parking Lot Lighting Installations.  

E-Print Network (OSTI)

??The purpose of this research was to identify the main causes of light pollution from parking lot electric lighting installations and highlight the deficiencies of (more)

Royal, Emily

2012-01-01T23:59:59.000Z

486

The strength of a knitted home: retrieving histories through Janet Morton's wool installations.  

E-Print Network (OSTI)

??This thesis focuses on the ways in which Janet Mortons installations explore geographic and architectural spatial arrangements, and the ways in which these arrangements reproduce (more)

Rothwell, Emily Jane