National Library of Energy BETA

Sample records for units operating hours

  1. Property:OperatingHours | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo,AltFuelVehicle2FlatDemandMonth3 Jump to: navigation, search ThisOperatingHours Jump to:

  2. Aerospace Engineering Laboratory (4 units) Class/Laboratory Schedule: Six lecture hours per week, three hours lab, three hours outside

    E-Print Network [OSTI]

    Wang, Deli

    drag, helicopter blade vibration, gyroscope control (1a, 2b, AE12). Objective 2: Working with real table, material testing machine, electromechanical and gyroscope control. Students operate facilities of the four different laboratory experiments (water tunnel; wind tunnel; material testing; control design) 2

  3. Identifying Challenging Operating Hours for Solar Intergration in the NV Energy System

    SciTech Connect (OSTI)

    Etingov, Pavel V.; Lu, Shuai; Guo, Xinxin; Ma, Jian; Makarov, Yuri V.; Chadliev, Vladimir; Salgo, Richard

    2012-05-09

    Abstract-- In this paper, the ability of the Nevada (NV) Energy generation fleet to meet its system balancing requirements under different solar energy penetration scenarios is studied. System balancing requirements include capacity, ramp rate, and ramp duration requirements for load following and regulation. If, during some operating hours, system capability is insufficient to meet these requirements, there is certain probability that the balancing authority’s control and reliability performance can be compromised. These operating hours are considered as “challenging” hours. Five different solar energy integration scenarios have been studied. Simulations have shown that the NV Energy system will be potentially able to accommodate up to 942 MW of solar photovoltaic (PV) generation. However, the existing generation scheduling procedure should be adjusted to make it happen. Fast-responsive peaker units need to be used more frequently to meet the increasing ramping requirements. Thus, the NV Energy system operational cost can increase. Index Terms—Solar Generation, Renewables Integration, Balancing Process, Load Following, Regulation.

  4. Unit Operation Efficiency Improvement Through Motionless Mixing 

    E-Print Network [OSTI]

    King, L. T.

    1984-01-01

    The efficient mixing of materials is a basic requirement at some stage of most processes. Examples of unit operations include mixers, blenders, heat exchangers and reactors that often use dynamic mixers. Motionless mixers on the other hand contain...

  5. Optimizing hourly hydro operations at the Salt Lake City Area integrated projects

    SciTech Connect (OSTI)

    Veselka, T.D.; Hamilton, S. [Argonne National Lab., IL (United States); McCoy, J. [Western Area Power Administration, Salt Lake City, UT (United States)

    1995-06-01

    The Salt Lake City Area (SLCA) office of the Western Area Power Administration (Western) is responsible for marketing the capacity and energy generated by the Colorado Storage, Collbran, and Rio Grande hydropower projects. These federal resources are collectively called the Salt Lake City Area Integrated Projects (SLCA/IP). In recent years, stringent operational limitations have been placed on several of these hydropower plants including the Glen Canyon Dam, which accounts for approximately 80% of the SLCA/IP resources. Operational limitations on SLCA/IP hydropower plants continue to evolve as a result of decisions currently being made in the Glen Canyon Dam Environmental Impact Statement (EIS) and the Power Marketing EIS. To analyze a broad range of issues associated with many possible future operational restrictions, Argonne National Laboratory (ANL), with technical assistance from Western has developed the Hydro LP (Linear Program) Model. This model simulates hourly operations at SLCA/IP hydropower plants for weekly periods with the objective of maximizing Western`s net revenues. The model considers hydropower operations for the purpose of serving SLCA firm loads, loads for special projects, Inland Power Pool (IPP) spinning reserve requirements, and Western`s purchasing programs. The model estimates hourly SLCA/IP generation and spot market activities. For this paper, hourly SLCA/IP hydropower plant generation is simulated under three operational scenarios and three hydropower conditions. For each scenario an estimate of Western`s net revenue is computed.

  6. Exhibit D: Mirant Potomac River Schedule of Unit Operations:...

    Office of Environmental Management (EM)

    Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 4, January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 4, January -...

  7. Exhibit D: Mirant Potomac River Schedule of Unit Operations:...

    Broader source: Energy.gov (indexed) [DOE]

    Operating Plan of Mirant Potomac River, LLC Exhibit D: Mirant Potomac River Schedule of Unit Operations More Documents & Publications Exhibit D: Mirant Potomac River Schedule of...

  8. Trace formulas for fourth order operators on unit interval, II

    E-Print Network [OSTI]

    Andrey Badanin; Evgeny Korotyaev

    2014-12-16

    We consider self-adjoint fourth order operators on the unit interval with the Dirichlet type boundary conditions. For such operators we determine few trace formulas, similar to the case of Gelfand--Levitan formulas for second order operators.

  9. Impact of High Wind Power Penetration on Hydroelectric Unit Operations

    SciTech Connect (OSTI)

    Hodge, B. M.; Lew, D.; Milligan, M.

    2011-01-01

    The Western Wind and Solar Integration Study (WWSIS) investigated the operational impacts of very high levels of variable generation penetration rates (up to 35% by energy) in the western United States. This work examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators. The cost impacts of maintaining hydro unit flexibility are assessed and compared for a number of different modes of system operation.

  10. Sub-Hourly Impacts of High Solar Penetrations in the Western United States: Preprint

    SciTech Connect (OSTI)

    Lew, D.; Brinkman, G.; Ibanez, E.; Hummon, M.; Hodge, B. M.; Heaney, M.; King, J.

    2012-09-01

    This paper presents results of analysis on the sub-hourly impacts of high solar penetrations from the Western Wind and Solar Integration Study Phase 2. Extreme event analysis showed that most large ramps were due to sunrise and sunset events, which have a significant predictability component. Variability in general was much higher in the high-solar versus high-wind scenario. Reserve methodologies that had already been developed for wind were therefore modified to take into account the predictability component of solar variability.

  11. SCHOOL OF MATHEMATICS AND STATISTICS Spring Semester 20072008 OPERATIONS RESEARCH 2 hours

    E-Print Network [OSTI]

    four will be counted. 1 (i) A company owns a steam turbine power generating plant that generates its steam from coal. It wishes to maximise the steam output. This, however, may result in emission that does per hour. The plant receives two grades of pul- verised coal, C1 and C2, for use in the steam plant

  12. Exhibit D: Mirant Potomac River Schedule of Unit Operations:...

    Office of Environmental Management (EM)

    Supplement 3, January and February 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 3, January and February 2006 Docket No. EO-05-01: Exhibit D: Mirant...

  13. Using AI Planning Techniques for Army Small Unit Operations 

    E-Print Network [OSTI]

    Tate, Austin; Levine, John; Jarvis, Peter; Dalton, Jeffrey

    In this paper, we outline the requirements of a planning and decision aid to support US Army small unit operations in urban terrain and show how AI planning technologies can be exploited in that context. The work is a rare ...

  14. Eielson Air Force Base Operable Unit 2 baseline risk assessment

    SciTech Connect (OSTI)

    Lewis, R.E.; Jarvis, T.T.; Jarvis, M.R.; Whelan, G.

    1994-10-01

    Operable Unit 2 at Eielson Air Force Base (AFB) near Fairbanks, is one of several operable units characterized by petroleum, oil, and lubricant contamination, and by the presence of organic products floating at the water table, as a result of Air Force operations since the 1940s. The base is approximately 19,270 acres in size, and comprises the areas for military operations and a residential neighborhood for military dependents. Within Operable Unit 2, there are seven source areas. These source areas were grouped together primarily because of the contaminants released and hence are not necessarily in geographical proximity. Source area ST10 includes a surface water body (Hardfill Lake) next to a fuel spill area. The primary constituents of concern for human health include benzene, toluene, ethylbenzene, and xylenes (BTEX). Monitored data showed these volatile constituents to be present in groundwater wells. The data also showed an elevated level of trace metals in groundwater.

  15. CONTED.UCALGARY.CA | 403.220.2866 Businesses and hours of operation are subject to change without notice.

    E-Print Network [OSTI]

    Calgary, University of

    CONTED.UCALGARY.CA | 403.220.2866 Businesses and hours of operation are subject to change without:30 am to 10:30 pm 933 ­ 7 Ave SW 403-266-2162 Sat 8:30 am to 10:30 pm Sun 8:30 am to 9:30 pm A Touch of Ginger Mon ­ Fri 11 am to 2 pm 618 ­ 8 Ave SW 403 262-8865 A Wish Cake & Café Mon ­ Fri 7:30 am to 7 pm

  16. Arithmetic units for RNS moduli {2n + 3} operations

    E-Print Network [OSTI]

    Sousa, Leonel

    Arithmetic units for RNS moduli {2n - 3} and {2n + 3} operations Pedro Miguens Matutino Department in Residue Number Systems (RNS), increasing the number of channels. With this, the processing time can the parallelism. In this paper, hardware structures for addition and multiplication operation in RNS

  17. 200-UP-2 Operable Unit technical baseline report

    SciTech Connect (OSTI)

    Deford, D.H.

    1991-02-01

    This report is prepared in support of the development of a Remedial Investigation/Feasibility Study (RI/FS) Work Plan for the 200-UP-2 Operable Unit by EBASCO Environmental, Incorporated. It provides a technical baseline of the 200-UP-2 Operable Unit and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The 200-UP-2 Operable Unit Technical Baseline Report is based on review and evaluation of numerous Hanford Site current and historical reports, Hanford Site drawings and photographs and is supplemented with Hanford Site inspections and employee interviews. No field investigations or sampling were conducted. Each waste site in the 200-UP-2 Operable Unit is described separately. Close relationships between waste units, such as overflow from one to another, are also discussed. The 200-UP-2 Operable Unit consists of liquid-waste disposal sites in the vicinity of, and related to, U Plant operations in the 200 West Area of the Hanford Site. The U Plant'' refers to the 221-U Process Canyon Building, a chemical separations facility constructed during World War 2. It also includes the Uranium Oxide (UO{sub 3}) Plant, which was constructed at the same time and, like the 221-U Process Canyon Building, was later converted for other missions. Waste sites in the 200-UP-2 Operable Unit are associated with the U Plant Uranium Metal Recovery Program mission that occurred between 1952 and 1958 and the UO{sub 3} Plant's ongoing uranium oxide mission and include one or more cribs, reverse wells, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, waste vaults, and the lines and encasements that connect them. 11 refs., 1 tab.

  18. 200-BP-5 operable unit Technical Baseline report

    SciTech Connect (OSTI)

    Jacques, I.D.; Kent, S.K.

    1991-10-01

    This report supports development of a remedial investigation/feasibility study work plan for the 200-BP-5 operable unit. The report summarizes baseline information for waste sites and unplanned release sites located in the 200-BP-5 operable unit. The sites were investigated by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The investigation consisted of review and evaluation of current and historical Hanford Site reports, drawings, and photographs, and was supplemented with recent inspections of the Hanford Site and employee interviews. No field investigations or sampling were conducted.

  19. Impact of High Wind Power Penetration on Hydroelectric Unit Operations: Preprint

    SciTech Connect (OSTI)

    Hodge, B. M.; Lew, D.; Milligan, M.

    2011-10-01

    This paper examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators.

  20. Method and apparatus for operating an improved thermocline storage unit

    DOE Patents [OSTI]

    Copeland, Robert J. (Lakewood, CO)

    1985-01-01

    A method and apparatus for operating a thermocline storage unit in which an insulated barrier member is provided substantially at the interface region between the hot and cold liquids in the storage tank. The barrier member physically and thermally separates the hot and cold liquids substantially preventing any diffusing or mixing between them and substantially preventing any heat transfer therebetween. The barrier member follows the rise and fall of the interface region between the liquids as the tank is charged and discharged. Two methods of maintaining it in the interface region are disclosed. With the structure and operation of the present invention and in particular the significant reduction in diffusing or mixing between the hot and cold liquids as well as the significant reduction in the thermal heat transfer between them, the performance of the storage tank is improved. More specifically, the stability of the interface region or thermocline is enhanced and the thickness of the thermocline is reduced producing a corresponding increase in the steepness of the temperature gradient across the thermocline and a more efficiently operating thermocline storage unit.

  1. Method and apparatus for operating an improved thermocline storage unit

    DOE Patents [OSTI]

    Copeland, R.J.

    1982-09-30

    A method and apparatus for operating a thermocline storage unit in which an insulated barrier member is provided substantially at the interface region between the hot and cold liquids in the storage tank. The barrier member physically and thermally separates the hot and cold liquids substantially preventing any diffusing or mixing between them and substantially preventing any heat transfer there between. The barrier member follows the rise and fall of the interface region between the liquids as the tank is charged and discharged. Two methods of maintaining it in the interface region are disclosed. With the structure and operation of the present invention and in particular the significant reduction in diffusing or mixing between the hot and cold liquids as well as the significant reduction in the thermal heat transfer between them, the performance of the storage tank is improved. More specifically, the stability of the interface region or thermocline is enhanced and the thickness of the thermocline is reduced producing a corresponding increase in the steepness of the temperature gradient across the thermocline and a more efficiently operating thermocline storage unit.

  2. Feasibility Study for Operable Unit 7-13/14

    SciTech Connect (OSTI)

    K. Jean Holdren Thomas E. Bechtold Brian D. Preussner

    2007-05-29

    The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision.

  3. Article separation apparatus and method for unit operations

    DOE Patents [OSTI]

    Pardini, Allan F.; Gervais, Kevin L.; Mathews, Royce A.; Hockey, Ronald L.

    2010-06-22

    An apparatus and method are disclosed for separating articles from a group of articles. The apparatus includes a container for containing one or more articles coupled to a suitable fluidizer for suspending articles within the container and transporting articles to an induction tube. A portal in the induction tube introduces articles singly into the induction tube. A vacuum pulls articles through the induction tube separating the articles from the group of articles in the container. The apparatus and method can be combined with one or more unit operations or modules, e.g., for inspecting articles, assessing quality of articles, or ascertaining material properties and/or parameters of articles, including layers thereof.

  4. 100-OL-1 Operable Unit Pilot Study: XRF Evaluation of Select...

    Office of Scientific and Technical Information (OSTI)

    100-OL-1 Operable Unit Pilot Study: XRF Evaluation of Select Pre-Hanford Orchards Citation Details In-Document Search Title: 100-OL-1 Operable Unit Pilot Study: XRF Evaluation of...

  5. Impact of High Wind Power Penetration on Hydroelectric Unit Operations in the WWSIS

    SciTech Connect (OSTI)

    Hodge, B.-M.; Lew, D.; Milligan, M.

    2011-07-01

    This report examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating patterns are examined both for an aggregation of all hydro generators and for select individual plants.

  6. Experience in operating L-35-5 selective hydrocracking unit

    SciTech Connect (OSTI)

    Bortov, V.Y.; Georgievskii, V.Y.; Semenov, V.F.; Shafranskii, E.L.; Shipikin, V.V.; Vasil'eva, M.N.

    1986-01-01

    This paper describes how the L-35-11 unit at the Kuibyshev refinery was converted to the process of selective hydrocracking, using a mixture of raffinates and hexane cut as the feed which enabled high-octane automotive gasolines to be obtained in this refinery. Basic process indices were determined when two fixed runs were made on feed consisting of a mixture of raffinates and hexane cuts in different ratios. The feed for run I was a mixture of benzenetoulene and xylene raffinates, and the feed for run II was a mixture of benzene-toulene raffinate and hexane cut. The principal results from these runs are presented. Poisoning of the catalyst by the sulfur-containing feed was eliminated by treating the catalyst for 4 h in hydrogen-rich gas at the operating temperature. This also restored the catalyst activity almost completely.

  7. Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergy Managing SwimmingMicrosoft Word1 2 - 2 0 1AERMOD-PRIME, Units 5,for 12

  8. DOE/RL-2014-38 100-OL-1 Operable Unit

    E-Print Network [OSTI]

    DOE/RL-2014-38 Revision 0 PNNL-23471 100-OL-1 Operable Unit Field Portable X-Ray Fluorescence (XRF) Analyzer Pilot Study Plan #12;#12;DOE/RL-2014-38 Revision 0 PNNL-23471 100-OL-1 Operable Unit Field endorsement, recommendation, or favoring by the United States Government or any agency thereof or its

  9. Minimizing Market Operation Costs Using A Security-Constrained Unit Commitment Approach

    E-Print Network [OSTI]

    McCalley, James D.

    Minimizing Market Operation Costs Using A Security-Constrained Unit Commitment Approach Qin Zhou that is currently in place. It uses a Security Constrained Unit Commitment application to commit enough units the specified time period. A post Must Offer Waiver procedure utilizing the Security Constrained Unit Commitment

  10. Building Operating Days Operating Hours ***Austin Building Monday -Friday 8:00 AM -10:00 PM (Mon, Tues, Thur), 8:00 AM -7:00 PM (Wed, Fri)

    E-Print Network [OSTI]

    Gopalakrishnan, K.

    Building Operating Days Operating Hours ***Austin Building Monday - Friday 8:00 AM - 10:00 PM (Mon, Tues, Thur), 8:00 AM - 7:00 PM (Wed, Fri) Bate Building Monday - Friday 8:00 AM - 10:00 PM (Mon - Thur), 8:00 AM - 7:00 PM (Fri) Brewster Building Monday - Friday 8:00 AM - 10:00 PM (Mon - Thur), 8:00 AM

  11. INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT

    SciTech Connect (OSTI)

    W.C. Adams

    2010-05-24

    INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT, MIAMISBURG, OHIO DCN: 0468-SR-02-0

  12. INDEPENDENT VERIFICATION SURVEY REPORT OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT

    SciTech Connect (OSTI)

    W.C. Adams

    2010-07-21

    INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT, MIAMISBURG, OHIO DCN: 0468-SR-03-0

  13. EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio

    Broader source: Energy.gov [DOE]

    This EIS evaluates the potential environmental impacts of a proposal to conduct remedial action at Operable Unit 4 at the Fernald Environmental Management Project.

  14. Attachment A: Modeling in Support of Additional Two-Unit Operating...

    Broader source: Energy.gov (indexed) [DOE]

    Plan of Mirant Potomac River, LLC Attachment A: Modeling in Support of Additional Two-Unit Operating Configurations More Documents & Publications Mirant Potomac, Alexandria,...

  15. Molten salt coal gasification process development unit. Phase 1. Volume 1. PDU operations. Final report

    SciTech Connect (OSTI)

    Kohl, A.L.

    1980-05-01

    This report summarizes the results of a test program conducted on the Molten Salt Coal Gasification Process, which included the design, construction, and operation of a Process Development Unit. In this process, coal is gasified by contacting it with air in a turbulent pool of molten sodium carbonate. Sulfur and ash are retained in the melt, and a small stream is continuously removed from the gasifier for regeneration of sodium carbonate, removal of sulfur, and disposal of the ash. The process can handle a wide variety of feed materials, including highly caking coals, and produces a gas relatively free from tars and other impurities. The gasification step is carried out at approximately 1800/sup 0/F. The PDU was designed to process 1 ton per hour of coal at pressures up to 20 atm. It is a completely integrated facility including systems for feeding solids to the gasifier, regenerating sodium carbonate for reuse, and removing sulfur and ash in forms suitable for disposal. Five extended test runs were made. The observed product gas composition was quite close to that predicted on the basis of earlier small-scale tests and thermodynamic considerations. All plant systems were operated in an integrated manner during one of the runs. The principal problem encountered during the five test runs was maintaining a continuous flow of melt from the gasifier to the quench tank. Test data and discussions regarding plant equipment and process performance are presented. The program also included a commercial plant study which showed the process to be attractive for use in a combined-cycle, electric power plant. The report is presented in two volumes, Volume 1, PDU Operations, and Volume 2, Commercial Plant Study.

  16. Coordinated Price-Maker Operation of Large Energy Storage Units in Nodal Energy Markets

    E-Print Network [OSTI]

    Mohsenian-Rad, Hamed

    1 Coordinated Price-Maker Operation of Large Energy Storage Units in Nodal Energy Markets Hamed to coordinate the operation of large, price-maker, and geographically dispersed energy storage / battery systems in a nodal transmission-constrained energy market. The energy storage units are assumed to be investor

  17. TRI-PARTY AGREEMENT OPERABLE UNITS PROJECT MANAGERS LIST AS...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    By MSA TPA Site Wide Integration Name EPA PM Ecology PM DOE PM Assistant Manager Lead Regulatory Agency (See Footnote) Unit Description 100-BC-1 Buelow, L.C. Menard, N....

  18. Tool-Assisted Unit-Test Generation and Selection Based on Operational Abstractions

    E-Print Network [OSTI]

    Xie, Tao

    Tool-Assisted Unit-Test Generation and Selection Based on Operational Abstractions Tao Xie1 of Washington, Seattle, WA 98105 Abstract. Unit testing, a common step in software development, presents a chal- lenge. When produced manually, unit test suites are often insufficient to identify defects. The main

  19. An Innovative Method for Dynamic Characterization of Fan FilterUnit Operation.

    SciTech Connect (OSTI)

    Xu, Tengfang

    2006-12-21

    Fan filter units (FFU) are widely used to deliver re-circulated air while providing filtration control of particle concentration in controlled environments such as cleanrooms, minienvironments, and operating rooms in hospitals. The objective of this paper is to document an innovative method for characterizing operation and control of an individual fan filter unit within its operable conditions. Built upon the draft laboratory method previously published [1] , this paper presents an updated method including a testing procedure to characterize dynamic operation of fan filter units, i.e., steady-state operation conditions determined by varied control schemes, airflow rates, and pressure differential across the units. The parameters for dynamic characterization include total electric power demand, total pressure efficiency, airflow rate, pressure differential across fan filter units, and airflow uniformity.

  20. Microchannel apparatus comprising plural microchannels and methods of conducting unit operations

    DOE Patents [OSTI]

    Wegeng, Robert S [Richland, WA; TeGrotenhuis, Ward E [Kennewick, WA; Whyatt, Greg A [West Richland, WA

    2009-03-10

    Microchannel apparatus comprising a header and plural flow microchannels is described in which orifices connect the header and the flow microchannels. The orifices constrict flow. The ratio of the cross-sectional area of each of the orifices to the cross-sectional area of the flow microchannels connected to the orifices is between 0.0005 and 0.1. Also described is microchannel apparatus for conducting unit operations in which a device comprises two arrays of microchannels, and a unit operation is conducted on a fluid as it passes through the first set of microchannels and into a header where a second unit operation is performed, and then the fluid stream passes into the second array of microchannels where the first unit operation is again performed. Methods of conducting unit operations in the apparatuses are also described.

  1. = 17 Hours 0 = 16 Hours 0

    E-Print Network [OSTI]

    Jacobs, Laurence J.

    Senior Status Required Degree Hours = 129 / Engineering Hours = 52 (see Note 10) This is not an official

  2. = 17 Hours 0 = 16 Hours 0

    E-Print Network [OSTI]

    Jacobs, Laurence J.

    Senior Status Required Degree Hours = 129 / Engineering Hours = 52 (see Note 9) This is not an official

  3. Operational test procedure for SY tank farm replacement exhauster unit

    SciTech Connect (OSTI)

    McClees, J.

    1995-09-26

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly.

  4. UNITED STATES ATOMIC ENERGY COMMISSION NEVADA OPERATIONS OFFICE

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReport for the WeldonB100 Ambrosia'1(DOE)F. a%UCRL-53628 . .UNITED

  5. Policies and Procedures for Establishing, Operating, and Reviewing Organized Research Units

    E-Print Network [OSTI]

    Alexandrova, Ivana

    40 Addendum A Policies and Procedures for Establishing, Operating, and Reviewing Organized Research of organized research units to conduct and facilitate coordinated research programs and service activities, to promote collaborations among and across disciplines, to enhance the University's research strengths

  6. 100-OL-1 Operable Unit Pilot Study: XRF Evaluation of Select...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OL-1 Operable Unit Pilot Study: XRF Evaluation of Select Pre-Hanford Orchards Bunn, Amoret L.; Fritz, Brad G.; Pulsipher, Brent A.; Gorton, Alicia M.; Bisping, Lynn E.;...

  7. Distribution-Based Clustering: Using Ecology To Refine the Operational Taxonomic Unit

    E-Print Network [OSTI]

    Preheim, Sarah Pacocha

    16S rRNA sequencing, commonly used to survey microbial communities, begins by grouping individual reads into operational taxonomic units (OTUs). There are two major challenges in calling OTUs: identifying bacterial population ...

  8. A Systems Approach to Optimize the Operation of a Refrigeration Unit at a Chemical Plant 

    E-Print Network [OSTI]

    Papar, R.; Zugibe, K.; Heitler, J.

    2005-01-01

    This paper focuses on the ongoing system level analysis and the optimization results of two steamturbine driven refrigeration units at the Dow Chemical company Peroxymerics (PXC) plant located at St. Charles Operations in Hahnville, LA. Six-sigma...

  9. Blue Helmeted Dragons : explaining China's participation in United Nations peace operations

    E-Print Network [OSTI]

    Lin-Greenberg, Erik

    2009-01-01

    China's personnel contributions to United Nations peace operations has significantly increased in the first decade of the twenty-first century, however little academic or policy attention has been given to examining patterns ...

  10. Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors

    SciTech Connect (OSTI)

    OHara J. M.; Higgins, J.; DAgostino, A.

    2012-01-17

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a single operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.

  11. 300-FF-1 Operable Unit physical separation of soils pilot plant study

    SciTech Connect (OSTI)

    Freeman-Pollard, J.R.

    1994-01-15

    Alternative Remedial Technologies, Inc. (ART) was selected in a competitive selection process to conduct a pilot study for the physical separation of soils in the North Process Pond of the 300 Area at the Hanford Site. In January 1994, ART mobilized its 15 tons-per-hour pilot plant to the site. The plant was initially staged in a commercial area to allow for pretest inspections and minor modifications. The plant was specifically designed for use as a physical separations unit and consisted of a feed hopper, wet screens, hydrocyclones, as well as settling and dewatering equipment. The plant was supported in the field with prescreening equipment, mobile generators, air compressors, and water storage tanks. The plant was moved into the surface contamination area on March 24, 1994. The testing was conducted during the period March 23, 1994 through April 13, 1994. Two soil types were treated during the testing: a natural soil contaminated with low levels of uranium, cesium, cobalt, and heavy metals, and a natural soil contaminated with a uranium carbonate material that was visually recognizable by the presence of a green sludge material in the soil matrix. The ``green`` material contained significantly higher levels of the same contaminants. Both source materials were treated by the plant in a manner that fed the material, produced clean gravel and sand fractions, and concentrated the contaminants in a sludge cake. Process water was recycled during the operations. The testing was extremely successful in that for both source waste streams, it was demonstrated that volume reductions of greater than 90% could be achieved while also meeting the test performance criteria. The volume reduction for the natural soils averaged a 93.8%, while the ``green`` soils showed a 91.4% volume reduction.

  12. Results of toxicity tests and chemical analyses conducted on sediments collected from the TNX Outfall Delta Operable Unit, July 1999

    SciTech Connect (OSTI)

    Specht, W.L.

    2000-02-11

    In order to provide unit specific toxicity data that will be used to address critical uncertainty in the ecological risk assessment (ERA) for the TNX Outfall Delta Operable Unit (TNXOD OU), sediments were collected from eight locations in the Inner Swamp portion of the operable unit and two unit specific background locations. These samples were analyzed for total mercury, total uranium, and sediment toxicity.

  13. Initial Husky BPU H-OIL{reg_sign} unit operations and performance

    SciTech Connect (OSTI)

    Faupel, T.H.; Tasker, K.G. [Hydrocarbon Research, Inc., Princeton, NJ (United States); Bannayan, M.A. [Husky Oil Operations Ltd., Saskatchewan (Canada)

    1995-12-31

    The Husky Bi-Provincial Upgrader (BPU) complex was successfully started up in the fall of 1992. The heart of this heavy oil upgrading plant is the H-Oil{reg_sign} unit, which utilizes ebullated-bed technology to hydrocrack and upgrade heavy atmospheric residue (400{degrees}C{sup +}) to synthetic crude oil. The H-Oil process, jointly licensed by Hydrocarbon Research, Inc. (HRI) and Texaco Development Corp. (TDC), employs daily catalyst additions and withdrawals, thereby maintaining constant catalytic activity. Since its successful start-up, the H-Oil unit, designed to process 5,088 m{sup 3}/sd (32,000 BPSD), has processed in excess of 5,850 m{sup 3}/sd (36,800 BPSD) of atmospheric residue at conversion levels in the 55 to 65 vol% range. The on-stream factor for the first year of operation has been a very respectable 81% for a new unit, which is significantly better than prior residue hydrocracking unit start-ups. The onstream factor for the second full year of operation was over 95% based on unit availability. The process performance and yields from the H-Oil unit have been in close agreement with the design values. The H-Oil unit was accepted by the BPU without a process guarantee test run which was waived. This paper summarizes the initial operations and performance of the H-Oil unit and provides a comparison of process performance and product yields between ebullated-bed laboratory units and the commercial unit.

  14. Proposed plan for remedial action at the quarry residuals operable unit of the Weldon Spring Site

    SciTech Connect (OSTI)

    NONE

    1998-03-01

    This proposed plan addresses the management of contamination present in various components of the quarry residuals operable unit (QROU) of the Weldon Spring site, which is located in St. Charles County, Missouri. The QROU consists of (1) residual waste at the quarry proper; (2) the Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek; and (3) quarry groundwater located primarily north of the slough. Potential impacts to the St. Charles County well field downgradient of the quarry area are also being addressed as part of the evaluations for this operable unit. Remedial activities for the QROU will be conducted by the US Department of Energy (DOE) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. As part of the remedial investigation/feasibility study (RI/FS) process required for the QROU under CERCLA, three major evaluation documents have been prepared to support cleanup decisions for this operable unit.

  15. United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.

  16. Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System Remedial Action Report

    SciTech Connect (OSTI)

    Lee Davison

    2009-06-30

    This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The site addressed in this report was defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for the site have been accomplished and is hereafter considered a No Further Action site.

  17. Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System Remedial Action Request

    SciTech Connect (OSTI)

    L. Davison

    2009-06-30

    This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The site addressed in this report was defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for the site have been accomplished and is hereafter considered a No Further Action site.

  18. Operable Unit 3-13, Group 3, Other Surface Soils (Phase II) Field Sampling Plan

    SciTech Connect (OSTI)

    G. L. Schwendiman

    2006-07-27

    This Field Sampling Plan describes the Operable Unit 3-13, Group 3, Other Surface Soils, Phase II remediation field sampling activities to be performed at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Sampling activities described in this plan support characterization sampling of new sites, real-time soil spectroscopy during excavation, and confirmation sampling that verifies that the remedial action objectives and remediation goals presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13 have been met.

  19. Groundwater Monitoring and Field Sampling Plan for Operable Unit 10-08

    SciTech Connect (OSTI)

    M. S. Roddy

    2007-05-01

    This plan describes the groundwater sampling and water level monitoring that will be conducted to evaluate contaminations in the Snake River Plain Aquifer entering and leaving the Idaho National Laboratory. The sampling and monitoring locations were selected to meet the data quality objectives detailed in this plan. Data for the Snake River Plain Aquifer obtained under this plan will be evaluated in the Operable Unit 10-08 Remedial Investigation/Feasibility Study report and will be used to support the Operable Unit 10-08 Sitewide groundwater model.

  20. Phase 1 remedial investigation report for 200-BP-1 operable unit. Volume 1

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit.

  1. Structural Characterization And Condition For Measurement Statistics Preservation Of A Unital Quantum Operation

    E-Print Network [OSTI]

    Kai-Yan Lee; Chi-Hang Fred Fung; H. F. Chau

    2013-04-16

    We investigate the necessary and sufficient condition for a convex cone of positive semidefinite operators to be fixed by a unital quantum operation $\\phi$ acting on finite-dimensional quantum states. By reducing this problem to the problem of simultaneous diagonalization of the Kraus operators associated with $\\phi$, we can completely characterize the kind of quantum states that are fixed by $\\phi$. Our work has several applications. It gives a simple proof of the structural characterization of a unital quantum operation that acts on finite-dimensional quantum states --- a result not explicitly mentioned in earlier studies. It also provides a necessary and sufficient condition for what kind of measurement statistics is preserved by a unital quantum operation. Finally, our result clarifies and extends the work of St{\\o}rmer by giving a proof of a reduction theorem on the unassisted and entanglement-assisted classical capacities, coherent information, and minimal output Renyi entropy of a unital channel acting on finite-dimensional quantum state.

  2. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  3. Hydrologic resources management program and underground test area operable unit fy 1997

    SciTech Connect (OSTI)

    Smith, D. F., LLNL

    1998-05-01

    This report present the results of FY 1997 technical studies conducted by the Lawrence Livermore National Laboratory (LLNL) as part of the Hydrology and Radionuclide Migration Program (HRMP) and Underground Test Area Operable Unit (UGTA). The HRMP is sponsored by the US Department of Energy to assess the environmental (radiochemical and hydrologic) consequences of underground nuclear weapons testing at the Nevada Test Site.

  4. Issued by Sandia Laboratories, operated for the United States Department of Energy by Sandia Corporation.

    E-Print Network [OSTI]

    and Reynold's Number Effects . . . . . . . . Blade Power Distribution . . . . . . . . . . . . . . Wind Shear in the Darrieus Turbine as a wind energy conversion device [1-4] has resulted in a need for an adequate#12;Issued by Sandia Laboratories, operated for the United States Department of Energy by Sandia

  5. Storm water control plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1996-04-01

    This document provides the Environmental Restoration Program with information about the erosion and sediment control, storm water management, maintenance, and reporting and record keeping practices to be employed during Phase II of the remediation project for the Lower East Fork Poplar Creek (LEFPC) Operable Unit.

  6. Pilot-scale treatability test plan for the 200-UP-1 groundwater Operable Unit

    SciTech Connect (OSTI)

    Wittreich, C.D.

    1994-05-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-UP-1 Operable Unit. This treatability test plan has been prepared in response to an agreement between the US Department of Energy, the US Environmental Protection Agency, and the Washington State Department of Ecology, as documented in Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994). The agreement also requires that, following completion of the activities described in this test plan, a 200-UP-1 Operable Unit interim remedial measure (IRM) proposed plan be developed for use in preparing an interim action record of decision (ROD). The IRM Proposed Plan will be supported by the results of the testing described in this treatability test plan, as well as by other 200-UP-1 Operable Unit activities (e.g., limited field investigation, development of a qualitative risk assessment). Once issued, the interim action ROD will specify the interim action for groundwater contamination at the 200-UP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-UP-1 Operable Unit. Primary contaminants of concern are uranium and technetium-99; the secondary contaminant of concern is nitrate. The pilot-scale treatability testing presented in this test plan has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants in groundwater withdrawn from the contaminant plume.

  7. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

  8. Summary of remedial investigations at the 307 retention basins and 307 trenches (316-3), 300-FF-2 Operable Unit

    SciTech Connect (OSTI)

    Hulstrom, L.C.

    1994-06-30

    Remedial investigations at the 307 retention basins and 307 trenches (316-3) in the 300 Area of the Hanford Site were conducted as part of the 300-FF-1 operable unit Phase 1 remedial investigation (RI) in accordance with the approved RI work plan. During the RI, the southwestern boundary of the 300-FF-1 operable unit was modified by all signatories to the Hanford Federal Facility Agreement and Consent Order, which shifted the 307 retention basins and 307 trenches to the 300-FF-3 operable unit. As a consequence, the RI results from these waste management units were not included in the Phase 1 Remedial Investigation Report for the 300-FF-1 Operable Unit. As a results of recent Hanford Federal Facility Agreement and Consent Order negotiations, the 300-FF-2 operable unit now consists of the remaining 300 Area operable units within the 300 Area National Priorities List (NPL), which includes the former 300-FF-3 operable unit. Therefore, this document summarizes the RI results from the 307 retention basins and 307 trenches in the 300-FF-2 operable unit. Analysis and evaluation of these results well be included in the 300-FF-2 RI report.

  9. Operation of fixed bed Resid HDS Unit in mild hydrocracking mode

    SciTech Connect (OSTI)

    Hohnholt, J.F.; Spengler, E.L. (Valero Refining Co., Corpus Christi, TX (United States)); Takeuchi, N.; Uchiyama, S. (Idemitsu Kosan Co., Ltd., Tokyo (Japan))

    1993-01-01

    Valero Refining has been restructuring their refinery to optimize conversion of high sulfur atmospheric resid into premium environmentally acceptable products. Valero has operated the Resid HDS Unit in a mild hydrocracking mode since 1989 to produce as much light liquid products as possible, in addition to producing low sulfur hydrotreated residue for feedstock to the HOC Unit. A resid hydrocracking catalyst (R-HYC) that Idemitsu Kosan Co. Ltd. and Catalyst Chemicals Ind. Co. (CCIC) have collaboratively developed was used in the Resid HDS to increase the yield of light liquid products. In summary, a twenty month run was successfully achieved on Valero's Resid HDS Unit using R-HYC catalyst. The yield of high quality transportation fuels was increased about 10 vol% over the yield obtained with conventional hydrotreating catalyst alone. The bottoms products from the Resid HDS Unit containing R-HYC catalyst was a high quality HOC feed. There was little or no difference in crackability of hydrotreated resid when compared to the product from a Resid HDS Unit containing conventional resid hydrotreating catalysts. Refining economics were improved by processing increased crude resid in the HOC Unit. Higher yields of hydrotreated atmospheric gas oil (AGO, 650--800 F) were achieved in resid hydrocracking mode, increasing further the profit margin of Valero Refining, since the AGO is processed in a recently completed gas oil hydrocracker.

  10. Screening of Potential Remediation Methods for the 200-BP-5 Operable Unit at the Hanford Site

    SciTech Connect (OSTI)

    Truex, Michael J.; Dresel, P. EVAN; Nimmons, Michael J.; Johnson, Christian D.

    2006-09-21

    A screening-level evaluation of potential remediation methods for application to the contaminants of concern (COC) in the 200-BP-5 Operable Unit at the Hanford Site was conducted based on the methods outlined in the Guidance for Conducting Remedial Investigations and Feasibility Studies under CERCLA Interim Final (EPA 1988). The scope of this screening was to identify the most promising remediation methods for use in the more detailed analysis of remediation alternatives that will be conducted as part of the full feasibility study. The screening evaluation was conducted for the primary COC (potential major risk drivers) identified in the groundwater sampling and analysis plan for the operable unit (DOE/RL-2001-49, Rev. 1) with additions.

  11. Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13

    SciTech Connect (OSTI)

    Richard P. Wells

    2007-03-23

    This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year.

  12. Discrete Sampling Test Plan for the 200-BP-5 Operable Unit

    SciTech Connect (OSTI)

    Sweeney, Mark D.

    2010-02-04

    The Discrete Groundwater Sampling Project is conducted by the Pacific Northwest National Laboratory (PNNL) on behalf of CH2M HILL Plateau Remediation Company. The project is focused on delivering groundwater samples from proscribed horizons within select groundwater wells residing in the 200-BP-5 Operable Unit (200-BP-5 OU) on the Hanford Site. This document provides the scope, schedule, methodology, and other details of the PNNL discrete sampling effort.

  13. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in this test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are {sup 99}Tc and {sup 60}Co for underwater affected by past discharges to the 216-BY Cribs, and {sup 90}Sr, {sup 239/240}Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes.

  14. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

  15. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

  16. Pilot-scale treatability test plan for the 100-HR-3 operable unit

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump-and-treat testing at the 100-HR-3 Operable Unit. The test will be conducted in fulfillment of interim Milestone M-15-06E to begin pilot-scale pump-and-treat operations by August 1994. The scope of the test was determined based on the results of lab/bench-scale tests (WHC 1993a) conducted in fulfillment of Milestone M-15-06B. These milestones were established per agreement between the U.S. Department of Energy (DOE), the Washington State Department of Ecology and the U.S. Environmental Protection Agency (EPA), and documented on Hanford Federal of Ecology Facility Agreement and Consent Order Change Control Form M-15-93-02. This test plan discusses a pilot-scale pump-and-treat test for the chromium plume associated with the D Reactor portion of the 100-HR-3 Operable Unit. Data will be collected during the pilot test to assess the effectiveness, operating parameters, and resource needs of the ion exchange (IX) pump-and-treat system. The test will provide information to assess the ability to remove contaminants by extracting groundwater from wells and treating extracted groundwater using IX. Bench-scale tests were conducted previously in which chromium VI was identified as the primary contaminant of concern in the 100-D reactor plume. The DOWEX 21K{trademark} resin was recommended for pilot-scale testing of an IX pump-and-treat system. The bench-scale test demonstrated that the system could remove chromium VI from groundwater to concentrations less than 50 ppb. The test also identified process parameters to monitor during pilot-scale testing. Water will be re-injected into the plume using wells outside the zone of influence and upgradient of the extraction well.

  17. A framework and methodology for enhancing operational requirements development : United States Coast Guard cutter project case study

    E-Print Network [OSTI]

    Schofield, Douglas M. (Douglas MacLean)

    2010-01-01

    Within any major United States Coast Guard cutter acquisition project, developing the operational requirements in the early phases of acquisition is difficult as the complexity of the system is not easily understood until ...

  18. Final Hazard Categorization for the Remediation of Six 300-FF-2 Operable Unit Solid Waste Burial Grounds

    SciTech Connect (OSTI)

    J. D. Ludowise; K. L. Vialetti

    2008-05-12

    This report provides the final hazard categorization for the remediation of six 300-FF-2 Operable Unit Burial Grounds, the 618-1, 618-2, 618-3, 618-7, 618-8, and 618-13 sites.

  19. More Than 410,000 Hours of Real-World Fuel Cell System Operation Have Been Analyzed by NREL's Technology Validation Team (Fact Sheet)

    SciTech Connect (OSTI)

    Kurtz, J.; Wipke, K.; Sprik, S.; Ramsden, T.

    2011-02-01

    This fact sheet discusses how researchers at the National Renewable Energy Laboratory (NREL) are working to validate hydrogen and fuel cell systems in real-world settings. NREL strives to provide an independent third-party technology assessment that focuses on fuel cell system and hydrogen infrastructure performance, operation, maintenance, and safety.

  20. Report on geological surveys in the 300-FF-1 operable unit

    SciTech Connect (OSTI)

    Sandness, G.A.

    1991-03-01

    This report describes a set of geophysical surveys performed by the Pacific Northwest Laboratory at selected locations within the 300-FF-1 Operable Unit at Hanford. Field work and preliminary data processing activities were initiated in September 1989. These actions were terminated by the Westinghouse Hanford Company before completion in December 1989. Work was reinitiated in October 1990, to complete the processing of the data that had already been collected and to report the results. Because the field work was only partially completed, the task objectives, as presented in the Statement of Work, could not be fully met. This report is, therefore, a progress report covering the work performed through December 11, 1989. This task involved (1) ground-penetrating radar surveys of the 618-4 and 618-5 Burial Grounds, and (2) ground-penetrating radar and electromagnetic induction surveys along the assumed routes of the abandoned process sewers and radioactive liquid waste sewers in the 300-FF-1 Operable Unit. The surveys in the burial grounds were intended to identify burial trenches and pits, to determine the depth of fill, and to locate waste materials, including any that might be outside the perimeter fences. The surveys along the sewer routes were intended, first, to confirm the locations of the sewers as shown on existing maps or to otherwise accurately determine their locations, and second, to attempt to identify locations of possible leaks. 3 refs., 3 figs., 2 tabs.

  1. Phase report 1C, TA-21 operable unit RCRA Facility Investigation, Outfalls Investigation

    SciTech Connect (OSTI)

    Not Available

    1994-02-28

    This phase report summarizes the results of field investigations conducted in 1992 at Technical Area 21 of Los Alamos National Laboratory, as prescribed by the RCRA Facility Investigation work plan for the Technical Area 21 operable unit (also known as OU 1106). This phase report is the last part of a three-part phase report describing the results of field work conducted in 1992 at this operable unit. Phase Report lA, issued on l4 June l993, summarized site geologic characterization activities. Phase report 1B, issued on 28 January 1994, included an assessment of site-wide surface soil background, airborne emissions deposition, and contamination in the locations of two former air filtration buildings. The investigations assessed in Phase Report 1C include field radiation surveys and surface and near-surface sampling to characterize potential contamination at 25 outfalls and septic systems listed as SWMUs in the RFI work plan. Based on the RFI data, it is recommended that no further action is warranted for 8 SWMUs and further action is recommended for 3 SWMUs addressed in this phase report. For 14 SWMUs which represent no immediate threat to human health or environment, deferral of further action/no further action decisions is recommended until outstanding analytical data are received, sampling of adjacent SWMUs is completed, or decisions are made about the baseline risk assessment approach.

  2. Liquid phase methanol LaPorte process development unit: Modification, operation, and support studies

    SciTech Connect (OSTI)

    Not Available

    1991-01-02

    Liquid-entrained operations at the LaPorte Liquid Phase Methanol (LPMEOH) Process Development Unit (PDU) continued during June and July 1988 under Tasks 2.1 and 2.2 of Contract No. DE-AC22-87PC90005 for the US Department of Energy. The primary focus of this PDU operating program was to prepare for a confident move to the next scale of operation with an optimized and simplified process. Several new design options had been identified and thoroughly evaluated in a detailed process engineering study completed under the LPMEOH Part-2 contract (DE-AC22-85PC80007), which then became the basis for the current PDU modification/operating program. The focus of the Process Engineering Design was to optimize and simplifications focused on the slurry loop, which consists of the reactor, vapor/liquid separator, slurry heat exchanger, and slurry circulation pump. Two-Phase Gas Holdup tests began at LaPorte in June 1988 with nitrogen/oil and CO- rich gas/oil systems. The purpose of these tests was to study the hydrodynamics of the reactor, detect metal carbonyl catalyst poisons, and train operating personnel. Any effect of the new gas sparger and the internal heat exchanger would be revealed by comparing the hydrodynamic data with previous PDU hydrodynamic data. The Equipment Evaluation'' Run E-5 was conducted at the LaPorte LPMEOH PDU in July 1988. The objective of Run E-5 was to systematically evaluate each new piece of equipment (sparger, internal heat exchanger, V/L disengagement zone, demister, and cyclone) which had been added to the system, and attempt to run the reactor in an internal-only mode. In addition, a successful catalyst activation with a concentrated (45 wt % oxide) slurry was sought. 9 refs., 26 figs., 15 tabs.

  3. LIBRARY SERVICES LIBRARY HOURS

    E-Print Network [OSTI]

    Royer, Dana

    LIBRARY SERVICES LIBRARY HOURS Up-to-date library hours are posted at http Wesleyan ID that is linked to the library circulation database is needed to charge out library materials to visit the Circulation Office in Olin Library 115 to set up their borrowing privileges. If you have

  4. The BENCHMARK trademark code: Simulation of hourly generation: User's guide

    SciTech Connect (OSTI)

    Jenkins, R.T. (Tennessee Univ., Chattanooga, TN (USA). School of Engineering)

    1990-04-01

    BENCHMARK simulates generator commitment and dispatch hourly for periods extending from one week to one year. Its value to utilities stems from its accurate representation of operator strategies and generator operating constraints (including ramp rate limits, minimum operating levels, and minimum uptime and downtime). The availability of thermal units is either prespecified or determined by a Monte Carlo technique. The program can model a pump-storage or compressed-air energy storage facility, and can allocate hydroelectric energy over a multiweek interval. BENCHMARK can produce reports with detailed hourly data or summary reports for part or all of the simulation period. Results can be reported for individual units or for groups of units. It is also possible to produce a file of data for use with an external graphics program. BENCHMARK is written in FORTRAN and requires about 2-1/2 megabytes of core. Execution times per simulation week and per Monte Carlo replication vary from under 1 second of CPU time for systems without a storage facility to up to about 10 seconds for a large system with pumped storage.

  5. 100-OL-1 Operable Unit Field Portable X-Ray Fluorescence (XRF) Analyzer Pilot Study Plans

    SciTech Connect (OSTI)

    Bunn, Amoret L.; Fritz, Brad G.; Wellman, Dawn M.

    2014-07-15

    A pilot study is being conducted to support the approval of the Remedial Investigation/Feasibility Study (RI/FS) Work Plan to evaluate the 100-OL-1 Operable Unit (OU) pre-Hanford orchard lands. Based on comments received by the U.S. Environmental Protection Agency (EPA) and Washington State Department of Ecology, the pilot study will evaluate the use of field portable X-ray fluorescence (XRF) spectrometry measurements for evaluating lead and arsenic concentrations on the soil surface as an indicator of past use of lead arsenate pesticide residue in the OU. The work will be performed in the field during the summer of 2014, and assist in the planning for the characterization activities in the RI/FS.

  6. Eielson Air Force Base operable unit 2 and other areas record of decision

    SciTech Connect (OSTI)

    Lewis, R.E.; Smith, R.M.

    1994-10-01

    This decision document presents the selected remedial actions and no action decisions for Operable Unit 2 (OU2) at Eielson Air Force Base (AFB), Alaska, chosen in accordance with state and federal regulations. This document also presents the decision that no further action is required for 21 other source areas at Eielson AFB. This decision is based on the administrative record file for this site. OU2 addresses sites contaminated by leaks and spills of fuels. Soils contaminated with petroleum products occur at or near the source of contamination. Contaminated subsurface soil and groundwater occur in plumes on the top of a shallow groundwater table that fluctuates seasonally. These sites pose a risk to human health and the environment because of ingestion, inhalation, and dermal contact with contaminated groundwater. The purpose of this response is to prevent current or future exposure to the contaminated groundwater, to reduce further contaminant migration into the groundwater, and to remediate groundwater.

  7. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    SciTech Connect (OSTI)

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided.

  8. Limited field investigation report for the 100-HR-1 Operable Unit

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-HR-1 Source Operable Unit LFI and the associated qualitative risk assessment (QRA) (WHC 1993a), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land use scenarios. A LFI Report is required, in accordance with the HPPS, when waste sites are to be considered for IRMs. The LFI is an integral part of the remedial investigation/feasibility study (RI/FS) or Resource Conservation and Recovery Act (RCRA) facility investigation/corrective measures study (RFI/CMS) and process and functions as a focused RI or RFI for selection of IRMs. The purpose of the report is to identify those sites that are recommended to remain as candidates for IRMs, provide a preliminary summary of site characterization studies, refine the conceptual model as needed, identify contaminant- and location-specific applicable or relevant and appropriate requirements (ARA), and provide a qualitative assessment of the risks associated with the sites. This assessment includes consideration of whether contaminant concentrations pose an unacceptable risk that warrants action through IRMs. The 100-HR-1 unit encompasses approximately 100 acres adjacent to the Columbia River shoreline. It contains waste units associated with the original plant facilities constructed to support the H Reactor. The area also contains evaporation basins which received liquid process wastes and nonroutine deposits of chemical wastes from the 300 Area, where fuel elements for the N Reactor were produced.

  9. 100-OL-1 Operable Unit Pilot Study: XRF Evaluation of Select Pre-Hanford Orchards

    SciTech Connect (OSTI)

    Bunn, Amoret L.; Fritz, Brad G.; Pulsipher, Brent A.; Gorton, Alicia M.; Bisping, Lynn E.; Brandenberger, Jill M.; Pino, Christian; Martinez, Dominique M.; Rana, Komal; Wellman, Dawn M.

    2014-11-20

    Prior to the acquisition of land by the U.S. Department of War in February 1943 and the creation of the Hanford Site, the land along the Columbia River was home to over 1000 people. Farming and orchard operations by both homesteaders and commercial organizations were prevalent. Orchard activities and the associated application of lead arsenate pesticide ceased in 1943, when residents were moved from the Hanford Site at the beginning of the Manhattan Project. Today, the residues from historical application of lead arsenate pesticide persist in some locations on the Hanford Site. In 2012, the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology established the 100-OL-1 Operable Unit (OU) through the Hanford Federal Facility Agreement and Consent Order, known as the Tri-Party Agreement. The pre-Hanford orchard lands identified as the 100-OL-1 OU are located south of the Columbia River and east of the present-day Vernita Bridge, and extend southeast to the former Hanford townsite. The discontinuous orchard lands within 100-OL-1 OU are approximately 20 km2 (5000 ac). A pilot study was conducted to support the approval of the remedial investigation/feasibility study work plan to evaluate the 100-OL-1 OU. This pilot study evaluated the use of a field portable X-ray fluorescence (XRF) analyzer for evaluating lead and arsenic concentrations on the soil surface as an indicator of lead arsenate pesticide residues in the OU. The objectives of the pilot study included evaluating a field portable XRF analyzer as the analytical method for decision making, estimating the nature and extent of lead and arsenic in surface soils in four decision units, evaluating the results for the purpose of optimizing the sampling approach implemented in the remedial investigation, and collecting information to improve the cost estimate and planning the cultural resources review for sampling activities in the remedial investigation. Based on the results of the pilot study, the recommendations for the revision of the work plan are as follows: • characterize the surface soil using field portable XRF measurements with confirmatory inductively coupled plasma mass spectroscopy sampling for the remedial investigation • establish decision units of similar defined areas • establish a process for field investigation of soil concentrations exceeding the screening criteria at the border of the 100-OL-1 OU • define data quality objectives for the work plan using the results of the pilot study and refining the sampling approach for the remedial investigation.

  10. An Innovative Method for Dynamic Characterization of Fan Filter Unit Operation.

    E-Print Network [OSTI]

    Xu, Tengfang

    2006-01-01

    large fan-filter units for cleanroom applications. BuildingFeedback Control in a Cleanroom. ” Building and Environment.Fan filter unit (FFU), cleanroom, energy efficiency, airflow

  11. Large-Scale Pumping Test Recommendations for the 200-ZP-1 Operable Unit

    SciTech Connect (OSTI)

    Spane, Frank A.

    2010-09-08

    CH2M Hill Plateau Remediation Company (CHPRC) is currently assessing aquifer characterization needs to optimize pump-and-treat remedial strategies (e.g., extraction well pumping rates, pumping schedule/design) in the 200-ZP-1 operable unit (OU), and in particular for the immediate area of the 241 TX-TY Tank Farm. Specifically, CHPRC is focusing on hydrologic characterization opportunities that may be available for newly constructed and planned ZP-1 extraction wells. These new extraction wells will be used to further refine the 3-dimensional subsurface contaminant distribution within this area and will be used in concert with other existing pump-and-treat wells to remediate the existing carbon tetrachloride contaminant plume. Currently, 14 extraction wells are actively used in the Interim Record of Decision ZP-1 pump-and-treat system for the purpose of remediating the existing carbon tetrachloride contamination in groundwater within this general area. As many as 20 new extraction wells and 17 injection wells may be installed to support final pump-and-treat operations within the OU area. It should be noted that although the report specifically refers to the 200-ZP-1 OU, the large-scale test recommendations are also applicable to the adjacent 200-UP-1 OU area. This is because of the similar hydrogeologic conditions exhibited within these two adjoining OU locations.

  12. Operable Unit 1 remedial investigation report, Eielson Air Force Base, Alaska

    SciTech Connect (OSTI)

    Gilmore, T.J.; Fruland, R.M.; Liikala, T.L.

    1994-06-01

    This remedial investigation report for operable Unit 1 (OU-1) at Eielson Air Force Base presents data, calculations, and conclusions as to the nature and extent of surface and subsurface contamination at the eight source areas that make up OU-1. The information is based on the 1993 field investigation result and previous investigations. This report is the first in a set of three for OU-1. The other reports are the baseline risk assessment and feasibility study. The information in these reports will lead to a Record of Decision that will guide and conclude the environmental restoration effort for OU-1 at Eielson Air Force Base. The primary contaminants of concern include fuels and fuel-related contaminants (diesel; benzene, toluene, ethylbenzene, and xylene; total petroleum hydrocarbon; polycyclic aromatic hydrocarbons), maintenance-related solvents and cleaners (volatile chlorinated hydrocarbons such as trichloroothylene), polychlorinated biphenyls, and dichlorodiphenyltrichloroethane (DDT). The origins of contaminants of concern include leaks from storage tanks, drums and piping, and spills. Ongoing operations and past sitewide practices also contribute to contaminants of concern at OU-1 source areas. These include spraying mixed oil and solvent wastes on unpaved roads and aerial spraying of DDT.

  13. Remedial investigation/feasibility study report for Lower Watts Bar Reservoir Operable Unit

    SciTech Connect (OSTI)

    1995-03-01

    This document is the combined Remedial Investigation and Feasibility Study Report for the lower Watts Bar Reservoir (LWBR) Operable Unit (OU). The LWBR is located in Roane, Rhea, and Meigs counties, Tennessee, and consists of Watts Bar Reservoir downstream of the Clinch river. This area has received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As required by this law, the ORR and all off-site areas that have received contaminants, including LWBR, must be investigated to determine the risk to human health and the environment resulting from these releases, the need for any remedial action to reduce these risks, and the remedial actions that are most feasible for implementation in this OU. Contaminants from the ORR are primarily transported to the LWBR via the Clinch River. There is little data regarding the quantities of most contaminants potentially released from the ORR to the Clinch River, particularly for the early years of ORR operations. Estimates of the quantities released during this period are available for most radionuclides and some inorganic contaminants, indicating that releases 30 to 50 years ago were much higher than today. Since the early 1970s, the release of potential contaminants has been monitored for compliance with environmental law and reported in the annual environmental monitoring reports for the ORR.

  14. UNIT DAMAGE ASSESSMENT -OFFICES & GENERAL OPERATIONS Email completed form to reportdamage@fau.edu or hand deliver to the Emergency Operations Center.

    E-Print Network [OSTI]

    Fernandez, Eduardo

    UNIT DAMAGE ASSESSMENT - OFFICES & GENERAL OPERATIONS Email completed form to reportdamage: Inspected By: Date: Phone: Category Description (Brief description of damage) Condition* Electrical Equip ranking based on the following: Good No Damage Fair Damage appears superficial, can be used as is Moderate

  15. Liquid phase methanol LaPorte process development unit: Modification, operation, and support studies

    SciTech Connect (OSTI)

    Not Available

    1990-11-09

    As part of the liquid phase methanol process development program the present study evaluated adsorptive schemes to remove catalyst poisons from coal gas at pilot scale. In addition to a lab test with coal gas from Coolwater, two field tests were performed at Great Plains with live coal gas. In the lab with Coolwater, gas iron carbonyl, carbonyl sulfide,and hydrogen sulfide were effectively removed from the coal gas. The capacities of H-Y zeolite and BPL carbon for Fe(CO){sub 5} agreed well with the previous bench scale results at similar CO{sub 2} partial pressure. COS appeared to be chemisorbed on FCA carbon; its capacity was non-regenerable by hot nitrogen purge. A Cu/Zn catalyst, used to remove H{sub 2}S adsorptively, worked adequately. With the adsorption system on-line, a downstream methanol catalyst showed stable activity for 120 hours of operation. In the two field tests, it was demonstrated that the Great Plains (GP) syngas could be treated by adsorption for LPMEOH process. The catalyst deactivation observed in the first field test was much improved in the second field test after regular (every three days) regeneration of the adsorbents was practiced. The absorption system, which was designed for the removal of iron/nickel carbonyls, hydrogen/carbonyl sulfide and hydrochloric acid, needed to be modified to accommodate other unexpected impurities, such as acetonitrile and ethylene which were observed during both field tests. A lab test with a simulated GP gas indicated that low CO{sub 2} content (0.5%) in the GP gas does not cause catalyst deactivation. Adjusting the CO{sub 2} content of the feed to 5% by CO{sub 2} addition, increased methanol productivity by 40% in both the lab and the second field test. 6 refs., 25 figs., 14 tabs.

  16. FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT

    SciTech Connect (OSTI)

    BYRNES ME

    2008-07-18

    The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km{sup 2} (586 mi{sup 2}) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 East Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986, and to the extent practicable, the NCP. This FS conforms to the conditions set forth in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 2003) and amendments, signed by the Washington State Department of Ecology (Ecology), EPA, and DOE Richland Operations Office (RL). This also includes Tri-Party Agreement Milestone M-015-00C for completing all 200 Area non-tank farm OU pre-Record of Decision (ROD) documents on or before December 31, 2011. This FS supports the final remedy selection for the 200-ZP-1 OU, as described in the Remedial Investigation/Feasibility Study Work Plan for the 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI/FS work plan) (DOE/RL-2003-55), as agreed upon by RL and EPA. Tri-Party Agreement Milestone M-015-48B required Draft A of the 200-ZP-1 OU FS and proposed plan to be transmitted to EPA by September 30, 2007. As agreed to with EPA in the 200 Area Unit Managers Meeting Groundwater Operable Unit Status (FH-0503130), the baseline risk assessment (BRA) was delayed from inclusion in the remedial investigation (RI) report and is completed and documented in this FS. The Remedial Investigation Report for 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI report) (DOE/RL-2006-24) included an evaluation of human health and ecological risks and hazards. The RI report identified the radiological and chemical contaminants of potential concern (COPCs) that represent the primary risks to human health and the environment. The complete risk assessment in this FS incorporates additional analytical data from the unconfined aquifer that were obtained during or after preparation of the RI report, particularly for carbon tetrachloride and technetium-99. This FS also includes the initial results from an ongoing study of technetium-99 contamination near WMA-T, the sampling of new wells near the 216-W-LC laundry waste crib and T Plant, updated Hanford vadose zone fate and transport modeling, and groundwater particle-tracking analysis. The purpose of this FS is to develop and evaluate alternatives for remediation of

  17. Hopper Hours Used

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation CurrentHenry Bellamy, Ph.D.Food Drive HolidayHours Used Hopper Hours Used 2015

  18. First Operational Experience with the LHC Beam Dump Trigger Synchronisation Unit

    E-Print Network [OSTI]

    Antoine, A; Magnin, N; Juteau, P; Voumard, N

    2011-01-01

    Two LHC Beam Dumping Systems (LBDS) remove the counter-rotating beams safely from the collider during setting up of the accelerator, at the end of a physics run and in case of emergencies. Dump requests can come from 3 different sources: the machine protection system in emergency cases, the machine timing system for scheduled dumps or the LBDS itself in case of internal failures. These dump requests are synchronized with the 3 ?s beam abort gap in a fail-safe redundant Trigger Synchronization Unit (TSU) based on a Digital Phase Locked Loop (DPLL), locked onto the LHC beam revolution frequency with a maximum phase error of 40 ns. The synchronized trigger pulses coming out of the TSU are then distributed to the high voltage generators of the beam dump kickers through a redundant fault-tolerant trigger distribution system. This paper describes the operational experience gained with the TSU since its commissioning with beam in 2009, and highlights the improvements, which have been implemented f...

  19. 2015 Thanksgiving Break Special Operating Hours

    E-Print Network [OSTI]

    , 12pm-1:30pm Black Women's Circle, 6pm-7:30pm Friday: Jazz, 10am-12pm India Arie: Live in Brazil, 1pm of the Rainbow: Assata Shakur" 5pm-7pm Thursday: African Dance Class, 12pm-1:30pm AA Alumni Meeting, 6:45pm-8pm

  20. Laboratory Policy After-Hours Operation

    E-Print Network [OSTI]

    /Flammable materials, use of Cutting or Coring machinery, or any activity where OSHA designates the wearing of Lab Coats and Protective Eyewear. Responsibilities PRINCIPAL INVESTAGATOR: ~ Must make sure that ALL persons Waste training. ~ Understand any and all regulations for the use and return of tools, location

  1. Fulfilled by Hours Earned

    E-Print Network [OSTI]

    Kunkle, Tom

    or equivalent) Public Speaking (Comm 104 or equivalent) Art History/Music Appreciation/Theatre History (choose 1) US/European/World History (choose 1) Philosophy/Religious Studies/Ethics/Literature (choose 1 student #12;Fulfilled by Course Hours Earned CSCI 112: Communications Technology & the Internet CSCI 115

  2. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III

    SciTech Connect (OSTI)

    R. P. Wells

    2006-09-19

    The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

  3. Fiscal Year 2009 Annual Report for Operable Unit 3-14, Tank Farm Soil and INTEC Groundwater

    SciTech Connect (OSTI)

    Forsythe, Howard S.

    2010-04-10

    This annual report summarizes maintenance, monitoring, and inspection activities performed to implement the selected remedy for Waste Area Group 3, Operable Unit 3-14, Tank Farm soil and groundwater at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Results from monitoring perched water and groundwater at the Idaho Nuclear Technology and Engineering Center are also presented.

  4. Phase 1 and 2 feasibility study report for the 300-FF-1 Operable Unit

    SciTech Connect (OSTI)

    Not Available

    1993-11-01

    The 300-FF-1 Operable Unit (OU) feasibility study (FS) presented in this document completes the FS process only through the first two study phases: Phase I, Remedial Alternatives Development, and Phase II, Remedial Alternatives Screening in accordance with CERCIA guidance for performing Remedial Investigations and Feasibility Studies (RI/FS) (EPA 1988a). This Phase I/II study provides a generalized view of workable remedial technologies as applied to the site contamination problems as a whole. Phase III, Detailed Analysis of Alternatives, will be performed at a later date to further evaluate screened alternatives based on the nine criteria in the CERCLA RI/FS guidance. The purpose of this Phase I/II FS is to develop and screen a range of alternatives for remediation of contamination present in the vadose zone of the 300-FF-1 OU. The scope of work for this Phase I/II FS includes five primary tasks: 1. Review existing documents and their associated data from relevant investigations and studies; 2. Establish remedial action objectives (RAO) and general response actions (GRA); 3. Identify applicable or relevant and appropriate requirements (ARARS) pertinent to all general response actions (including waste disposal); 4. Develop remedial alternatives (Phase I) applicable to the 300-FF-1 OU including identification and screening of technologies and process options, and assembly of remedial alternatives from representative technology types; 5. Screen alternatives (Phase II) developed in Phase I for implementability, effectiveness, and cost to identify those alternatives which warrant advancement to the detailed analysis phase (Phase III) of the FS.

  5. Ancillary Services in the United States: Independent System Operator (ISO) Perspective (Presentation)

    SciTech Connect (OSTI)

    Cochran, J.

    2013-05-01

    The presentation provides an overview of how increasing penetrations of variable renewable energy on the electricity grid are impacting ancillary services markets in the United States.

  6. Hours Available FY

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation CurrentHenry Bellamy, Ph.D.Food Drive HolidayHours UsedFire 1 in 3 students

  7. Hours of Duty

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (JournalvivoHigh energyHighlandWorkshop-Summer 2014to PLAs Hourly Wage

  8. Evolution of interagency cooperation in the United States Government : the Maritime Operational Threat Response Plan

    E-Print Network [OSTI]

    Tomasulo, Gary L., Jr

    2010-01-01

    Following the September 11, 2001 terrorist attacks, there was concern among maritime security experts that terrorist or criminal organizations that wanted to do harm to the United States could exploit gaps that existed ...

  9. United Technologies Corporation: Achieving Competitive Excellence (ACE): Operating System Case Study

    E-Print Network [OSTI]

    Roth, George

    2010-11-30

    United Technologies Corporation (abbreviated UTC, NYSE ticker symbol UTX) is a large, industrial conglomerate that designs, manufactures, and services a broad range of products, ranging from air conditioners and elevators ...

  10. Baseline risk assessment for the quarry residuals operable unit of the Weldon Spring Site, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    NONE

    1998-02-01

    The U.S. Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis. Cleanup of the site consists of several integrated components. The quarry residuals operable unit (QROU), consisting of the Weldon Spring quarry and its surrounding area, is one of four operable units being evaluated. In accordance with requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE is conducting a remedial investigation/feasibility study (RI/FS) to determine the proper response to address various contaminated media that constitute the QROU. Specifically, the operable unit consists of the following areas and media: the residual material remaining at the Weldon Spring quarry after removal of the pond water and the bulk waste; groundwater underlying the quarry and surrounding area; and other media located in the surrounding vicinity of the quarry, including surface water and sediment at Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek. An initial evaluation of conditions at the quarry area identified remaining data requirements needed to support the conceptual site exposure and hydrogeological models. These data requirements are discussed in the RI/FS work plan issued in January 1994. Soil contamination located at a property adjacent to the quarry, referred to as Vicinity Property 9 (VP9), was originally part of the scope of the QROU, as discussed in the work plan. However, a decision was subsequently made to remediate this vicinity property as part of cleanup activities for the chemical plant operable unit, as provided for in the Record of Decision (ROD). Remediation of VP9 was completed in early 1996. Hence, this baseline risk assessment (BRA) does not address VP9.

  11. TECHNICAL EVALUATION OF SOIL REMEDIATION ALTERNATIVES AT THE BUILDING 812 OPERABLE UNIT, LAWRENCE LIVERMORE NATIONAL LABORATORY SITE 300

    SciTech Connect (OSTI)

    Eddy-Dilek, C.; Miles, D.; Abitz, R.

    2009-08-14

    The Department of Energy Livermore Site Office requested a technical review of remedial alternatives proposed for the Building 812 Operable Unit, Site 300 at the Lawrence Livermore National Laboratory. The team visited the site and reviewed the alternatives proposed for soil remediation in the draft RI/FS and made the following observations and recommendations. Based on the current information available for the site, the team did not identify a single technology that would be cost effective and/or ecologically sound to remediate DU contamination at Building 812 to current remedial goals. Soil washing is not a viable alternative and should not be considered at the site unless final remediation levels can be negotiated to significantly higher levels. This recommendation is based on the results of soil washing treatability studies at Fernald and Ashtabula that suggest that the technology would only be effective to address final remediation levels higher than 50 pCi/g. The technical review team identified four areas of technical uncertainty that should be resolved before the final selection of a preferred remedial strategy is made. Areas of significant technical uncertainty that should be addressed include: (1) Better delineation of the spatial distribution of surface contamination and the vertical distribution of subsurface contamination in the area of the firing table and associated alluvial deposits; (2) Chemical and physical characterization of residual depleted uranium (DU) at the site; (3) Determination of actual contaminant concentrations in air particulates to support risk modeling; and (4) More realistic estimation of cost for remedial alternatives, including soil washing, that were derived primarily from vendor estimates. Instead of conducting the planned soil washing treatability study, the team recommends that the site consider a new phased approach that combines additional characterization approaches and technologies to address the technical uncertainty in the remedial decision making. The site should redo the risk calculations as the future use scenario has changed for the site. As a result, the existing model is based on very conservative assumptions that result in calculation of unreasonably low cleanup goals. Specifically, the review team proposes that LLNL consider: (1) Revising the industrial worker scenario to a reasonable maximum exposure (RME) for a site worker that performs a weekly walk down of the area for two hours for 25 years (or an alternative RME if the exposure scenario changes); (2) Revising the ESSI of 2 mg U per kg soil for the deer mouse to account for less than 0.05 of the total ingested uranium being adsorbed by the gut; (3) Revising bioaccumulation factors (BAFs) for vegetation and invertebrates that are based on 100 mg of soluble uranium per kg of soil, as the uranium concentration in the slope soil does not average 100 mg/kg and it is not all in a soluble form; and (4) Measuring actual contaminant concentrations in air particulates at the site and using the actual values to support risk calculations. The team recommends that the site continue a phased approach during remediation. The activities should focus on elimination of the principal threats to groundwater by excavating (1) source material from the firing table and alluvial deposits, and (2) soil hotspots from the surrounding slopes with concentrations of U-235 and U-238 that pose unacceptable risk. This phased approach allows the remediation path to be driven by the results of each phase. This reduces the possibility of costly 'surprises', such as failure of soil treatment, and reduces the impact of remediation on endangered habitat. Treatment of the excavated material with physical separation equipment may result in a decreased volume of soil for disposal if the DU is concentrated in the fine-grained fraction, which can then be disposed of in an offsite facility at a considerable cost savings. Based on existing data and a decision to implement the recommended phased approach, the cost of characterization, excavation and physical

  12. Superfund record of decision (EPA Region 4): Paducah Gaseous Diffusion Plant (USDOE) Operable Unit 5, Paducah, KY, August 10, 1998

    SciTech Connect (OSTI)

    NONE

    1998-12-01

    This Record of Decision (ROD) presents the final remedial action decisions selected for soils and sediments in each of the solid waste management units (SWMUs) of Waste Area Groups (WAGs) 1 and 7 at the Paducah Gaseous Diffusion Plant (PGDP) near Paducah, Kentucky. Waste Area Group 1 consists of SWMUs 100 and 136. Waste Area Group 7 consists of SWMUs 8 and 130 through 134. By mutual consent among the United States Environmental Protection Agency (EPA), the Kentucky Department for Environmental Protection (KDEP), the United States Department of Defense (DOD), the United States Army Corps of Engineers (COE), and the DOE, it was agreed that the evaluation and implementation of any remedial actions required for the Kentucky Ordnance Works (KOW) SWMUs (SWMU 94 (KOW Sewage Treatment Plant), SWMU 95 (KOW Burn Area), and SWMU 157 (KOW Toluene Spill Site)), formerly included in WAGs 1 and 7, would be the responsibility of the DOD and conducted on behalf of the DOD by the COE. Due to the agreements reached among these entities, remedial technologies for the KOW SWMUs are not discussed further in this ROD and will be evaluated as part of the WAG 10 investigation by the COE. Additionally, by written mutual consent, the EPA, the DKEP, and the DOE agreed that an evaluation of remedial alternatives for SWMU 38, the C-615 Sewage Treatment Plant, would be deferred until the unit ceases operation. Consequently, no remedial actions are discussed for these SWMUs in this ROD.

  13. Cost-Optimal Operation of Energy Storage Units: Benefits of a Problem-Specific Approach

    E-Print Network [OSTI]

    Siemer, Lars; Kleinhans, David

    2015-01-01

    The integration of large shares of electricity produced by non-dispatchable Renewable Energy Sources (RES) leads to an increasingly volatile energy generation side, with temporary local overproduction. The application of energy storage units has the potential to use this excess electricity from RES efficiently and to prevent curtailment. The objective of this work is to calculate cost-optimal charging strategies for energy storage units used as buffers. For this purpose, a new mathematical optimization method is presented that is applicable to general storage-related problems. Due to a tremendous gain in efficiency of this method compared with standard solvers and proven optimality, calculations of complex problems as well as a high-resolution sensitivity analysis of multiple system combinations are feasible within a very short time. As an example technology, Power-to-Heat converters used in combination with thermal storage units are investigated in detail and optimal system configurations, including storage ...

  14. Grading System & GPA Calculation UMass Credit Hour

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    semester. This standard assumes that each credit hour generates two hours of assigned work for every hour

  15. Issued by Sandia National Laboratories, operated for the United States Department of Energy by Sandia Corporation.

    E-Print Network [OSTI]

    @adonis.osti.gov Online ordering: http://www.DOE.gov/bridge Available to the public from U.S. Department of Commerce programmable read-only memory RAM random access memory RBU rotor-based unit SDAS Smart Data Acquisition System

  16. Advanced control improves MHC-VGO unit operation. [Mild HydroCracking-Vacuum Gas Oil

    SciTech Connect (OSTI)

    Richard, L.; Watson, D. (Setpoint Inc., Houston, TX (United States)); Danzinger, F.; Tuppinger, D.; Schuster, R.; Wilmsen, W. (OMV AG, Schwechat (Germany))

    1995-03-01

    Constraint and multivariable predictive (MPC) controllers were implemented on an FCC preheater (MHC-VGO unit), which runs in mild hydrocracking (MHC) mode. In only a few weeks following commissioning, better control provided an average reduction in steam use of 38%, an average reduction of 22% in DEA use and a 5 to 10% reduction in fuel consumption. OMV's refinery in Schwechat was commissioned in 1960 and is now one of the largest and most complex inland-refineries in Europe with an annual crude oil processing capacity of 10 million metric tons. Every product stream is desulfurized by hydrodesulfurization (HDS) units. As part of a refinery-wide advanced control (ADVC) project which includes 27 units implemented on four process computers and two DCSs, advanced controls were installed on the MHC-VGO unit. The entire project was executed over a period of two and a half years. The paper describes the process, advanced control, the weighted average bed temperature controller, feed maximization control, stripper feed temperature control, stripping steam/feed ratio controller, stripper pressure minimization, H[sub 2]/oil controller, recycle/DEA ratio controller, stripper bottoms level controller, and advanced control benefits.

  17. Application and Operation of a 2-MW Organic Rankine Cycle System on a Refinery FCC Unit 

    E-Print Network [OSTI]

    Drake, R. L.

    1985-01-01

    The nation's largest organic Rankine cycle (ORC) waste heat recovery system was started up in July 1984 at a West Coast oil refinery. The system includes two hermetically sealed turbine-generator units, each rated at 1070 kW. Each turbine...

  18. 2. Unit Operation Dynamic simulation Unit operation

    E-Print Network [OSTI]

    Hong, Deog Ki

    flow heat exchanger . 2.3 Piping equipment Mixer, tee, pipe, gas pipe, valve, relief valve . 2 specification . 2.2 Heat transfer equipment Air cooler, cooler/heater, heat exchanger, fired heater LNG multi

  19. Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Annual Status Report for Fiscal Year 2006

    SciTech Connect (OSTI)

    R. P. Wells

    2007-05-09

    This report provides a status of the progress made in Fiscal Year 2006 on tasks identified in the Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Work Plan. Major accomplishments include: (1) groundwater sampling and review of the groundwater monitoring data, (2) installation of a Sitewide groundwater-level monitoring network, (3) update of the Groundwater Monitoring and Field Sampling Plan of Operable Unit 10-08, (4) re-evaluation of the risk at Site TSF-08, (5) progress on the Operable Unit 10-08 Sitewide Groundwater Model.

  20. Analysis of Unit-Level Changes in Operations with Increased SPP Wind from EPRI/LCG Balancing Study

    SciTech Connect (OSTI)

    Hadley, Stanton W

    2012-01-01

    Wind power development in the United States is outpacing previous estimates for many regions, particularly those with good wind resources. The pace of wind power deployment may soon outstrip regional capabilities to provide transmission and integration services to achieve the most economic power system operation. Conversely, regions such as the Southeastern United States do not have good wind resources and will have difficulty meeting proposed federal Renewable Portfolio Standards with local supply. There is a growing need to explore innovative solutions for collaborating between regions to achieve the least cost solution for meeting such a renewable energy mandate. The Department of Energy funded the project 'Integrating Midwest Wind Energy into Southeast Electricity Markets' to be led by EPRI in coordination with the main authorities for the regions: SPP, Entergy, TVA, Southern Company and OPC. EPRI utilized several subcontractors for the project including LCG, the developers of the model UPLAN. The study aims to evaluate the operating cost benefits of coordination of scheduling and balancing for Southwest Power Pool (SPP) wind transfers to Southeastern Electric Reliability Council (SERC) Balancing Authorities (BAs). The primary objective of this project is to analyze the benefits of regional cooperation for integrating mid-western wind energy into southeast electricity markets. Scenarios were defined, modeled and investigated to address production variability and uncertainty and the associated balancing of large quantities of wind power in SPP and delivery to energy markets in the southern regions of the SERC. DOE funded Oak Ridge National Laboratory to provide additional support to the project, including a review of results and any side analysis that may provide additional insight. This report is a unit-by-unit analysis of changes in operations due to the different scenarios used in the overall study. It focuses on the change in capacity factors and the number of start-ups required for each unit since those criteria summarize key aspects of plant operations, how often are they called upon and how much do they operate. The primary analysis of the overall project is based on security-constrained unit commitment (SCUC) and economic dispatch (SCED) simulations of the SPP-SERC regions as modeled for the year 2022. The SCUC/SCED models utilized for the project were developed through extensive consultation with the project utility partners, to ensure the various regions and operational practices are represented as best as possible in the model. SPP, Entergy, Oglethorpe Power Company (OPC), Southern Company, and the Tennessee Valley Authority (TVA) actively participated in the project providing input data for the models and review of simulation results and conclusions. While other SERC utility systems are modeled, the listed SERC utilities were explicitly included as active participants in the project due to the size of their load and relative proximity to SPP for importing wind energy.

  1. Fleet vehicles in the Unites States: composition, operating characteristics, and fueling practices

    SciTech Connect (OSTI)

    Miaou, S.P.; Hu, P.S. [Oak Ridge National Lab., TN (United States); Young, J.R. [Tennessee Univ., Knoxville, TN (United States)

    1992-05-01

    As fleets become a larger proportion of the new vehicle population on the road, they have more influence on the characteristics of the total US motor vehicle population. One of the characteristics which fleets are expected to have the most influence on is the overall vehicle fuel economy. In addition, because of the relatively large market share and the high turnover rate of fleet vehicles, fleets have been considered as a useful initial market for alternative fuel vehicles. In order to analyze fleet market potential and likely market penetration of alternative fuel vehicles and to infrastructure requirements for successful operations of these vehicles in the future, information on fleet sizes and composition, fleet vehicle operating characteristics (such as daily/annual miles of travel), fuel efficiency, and refueling practices, is essential. The purpose of this report is to gather and summarize information from the latest data sources available pertaining to fleet vehicles in the US This report presents fleet vehicle data on composition, operating characteristics, and fueling practices. The questions these data are intended to address include: (1) How are fleet vehicles operated? (2) Where are they located? and (3) What are their usual fueling practices? Since a limited number of alternative fuel fleet vehicles are already in use, data on these vehicles are also included in this report. 17 refs.

  2. SEP operating history of the Dresden Nuclear Power Station Unit 2

    SciTech Connect (OSTI)

    Mays, G.T.; Harrington, K.H.

    1983-01-01

    206 forced shutdowns and power reductions were reviewed, along with 631 reportable events and other miscellaneous documentation concerning the operation of Dresden-2, in order to indicate those areas of plant operation that compromised plant safety. The most serious plant challenge to plant safety occurred on June 5, 1970; while undergoing power testing at 75% power, a spurious signal in the reactor pressure control system caused a turbine trip followed by a reactor scram. Subsequent erratic water level and pressure control in the reactor vessel, compounded by a stuck indicator pen on a water level monitor-recorder and inability of the isolation condenser to function, led to discharge of steam and water through safety valves into the reactor drywell. No significant contamination was discharged. There was no pressure damage or the reactor vessel of the drywell containment walls. Six areas of operation that should be of continued concern are diesel generator failures, control rod and rod drive malfunctions, radioactive waste management/health physics program problems, operator errors, turbine control valve and EHC problems, and HPCI failures. All six event types have continued to recur.

  3. ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 1-07B, FISCAL YEAR 2009

    SciTech Connect (OSTI)

    FORSYTHE, HOWARD S

    2010-04-14

    This Annual Report presents the data and evaluates the progress of the three-component remedy implemented for remediation of groundwater contamination at Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory Site. Overall, each component is achieving progress toward the goal of total plume remediation. In situ bioremediation operations in the hot spot continue to operate as planned. Progress toward the remedy objectives is being made, as evidenced by continued reduction in the amount of accessible residual source and decreases in downgradient contaminant flux, with the exception of TAN-28. The injection strategy is maintaining effective anaerobic reductive dechlorination conditions, as evidenced by complete degradation of trichloroethene and ethene production in the biologically active wells. In the medial zone, the New Pump and Treat Facility operated in standby mode. Trichloroethene concentrations in the medial zone wells are significantly lower than the historically defined concentration range of 1,000 to 20,000 ?g/L. The trichloroethene concentrations in TAN-33, TAN-36, and TAN-44 continue to be below 200 ?g/L. Monitoring in the distal zone wells outside and downgradient of the plume boundary demonstrate that some plume expansion has occurred, but less than the amount allowed in the Record of Decision Amendment. Additional data need to be collected for wells in the monitored natural attenuation part of the plume to confirm that the monitored natural attenuation part of the remedy is proceeding as predicted in the modeling.

  4. Public Participation Plan for Waste Area Group 7 Operable Unit 7-13/14 at the Idaho National Laboratory Site

    SciTech Connect (OSTI)

    B. G. Meagher

    2007-07-17

    This Public Participation Plan outlines activities being planned to: (1) brief the public on results of the remedial investigation and feasibility study, (2) discuss the proposed plan for remediation of Operable Unit 7-13/14 with the public, and (3) encourage public participation in the decision-making process. Operable Unit 7-13/14 is the Comprehensive Remedial Investigation/Feasibility Study for Waste Area Group 7. Analysis focuses on the Subsurface Disposal Area (SDA) within the Radioactive Waste Management Complex at the Idaho National Laboratory (Site). This plan, a supplement to the Idaho National Laboratory Community Relations Plan (DOE-ID 2004), will be updated as necessary. The U.S. Department of Energy (DOE), Idaho Department of Environmental Quality (DEQ), and U.S. Environmental Protection Agency (EPA) will participate in the public involvement activities outlined in this plan. Collectively, DOE, DEQ, and EPA are referred to as the Agencies. Because history has shown that implementing the minimum required public involvement activities is not sufficient for high-visibility cleanup projects, this plan outlines additional opportunities the Agencies are providing to ensure that the public’s information needs are met and that the Agencies can use the public’s input for decisions regarding remediation activities.

  5. Surry unit 2 end of cycle 4 onsite fuel examination: reduced data and operating history

    SciTech Connect (OSTI)

    Balfour, M.G.; Schmidt, G.R.; Muenks, M.F.; Isaac, P.G.; Eng, G.H.

    1981-02-01

    Onsite nondestructive examinations were performed at the end of reactor cycle 4 on 17 x 17 demonstration assemblies irradiated in the Surry Unit 2 reactor during cycles 2, 3, and 4. Two three-cycle 17 x 17 demonstration fuel assemblies, four two-cycle 17 x 17 removable fuel rods, and eight three-cycle 17 x 17 removable fuel rods were examined. These examinations included television visual examinations and grid cell friction force measurements performed on the fuel assemblies and breakaway/withdrawal force measurements, television visual examinations, and profilometry measurements performed on the removable fuel rods. The actual reduced onsite data from the breakaway/withdrawal force measurements, the grid cell friction force measurements, and the profilometry measurements are contained in this report.

  6. Co-operation Agreement between the European Organization for Nuclear Research and the Department of Energy of the United States of America and the National Science Foundation of the United States of America concerning Scientific and Technical Co-operation in Nuclear and Particle Physics

    E-Print Network [OSTI]

    2015-01-01

    Co-operation Agreement between the European Organization for Nuclear Research and the Department of Energy of the United States of America and the National Science Foundation of the United States of America concerning Scientific and Technical Co-operation in Nuclear and Particle Physics

  7. Incorporating Wind Generation Forecast Uncertainty into Power System Operation, Dispatch, and Unit Commitment Procedures

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Etingov, Pavel V.; Huang, Zhenyu; Ma, Jian; Subbarao, Krishnappa

    2010-10-19

    In this paper, an approach to evaluate the uncertainties of the balancing capacity, ramping capability, and ramp duration requirements is proposed. The approach includes three steps: forecast data acquisition, statistical analysis of retrospective information, and prediction of grid balancing requirements for a specified time horizon and a given confidence level. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on histogram analysis, incorporating sources of uncertainty of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the "flying-brick" technique is developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation process is used to validate the accuracy of the confidence intervals. To demonstrate the validity of the developed uncertainty assessment methods and its impact on grid operation, a framework for integrating the proposed methods with an EMS system is developed. Demonstration through integration with an EMS system illustrates the applicability of the proposed methodology and the developed tool for actual grid operation and paves the road for integration with EMS systems from other vendors.

  8. Incorporating Uncertainty of Wind Power Generation Forecast into Power System Operation, Dispatch, and Unit Commitment Procedures

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Etingov, Pavel V.; Ma, Jian; Huang, Zhenyu; Subbarao, Krishnappa

    2011-06-23

    An approach to evaluate the uncertainties of the balancing capacity, ramping capability, and ramp duration requirements is proposed. The approach includes three steps: forecast data acquisition, statistical analysis of retrospective information, and prediction of grid balancing requirements for a specified time horizon and a given confidence level. An assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on histogram analysis, incorporating sources of uncertainty - both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures). A new method called the 'flying-brick' technique is developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation process is used to validate the accuracy of the confidence intervals. To demonstrate the validity of the developed uncertainty assessment methods and its impact on grid operation, a framework for integrating the proposed methods with an EMS system is developed. Demonstration through EMS integration illustrates the applicability of the proposed methodology and the developed tool for actual grid operation and paves the road for integration with EMS systems in control rooms.

  9. Liquid phase methanol LaPorte process development unit: Modification operation, and support studies

    SciTech Connect (OSTI)

    Not Available

    1991-01-28

    In April 1987, Air Products started the third and final contract with the US Department of Energy to develop the Liquid Phase Methanol (LPMEOH) process. One of the objectives was to identify alternative commercial catalyst(s) for the process. This objective was strategically important as we want to demonstrate that the LPMEOH process is flexible and not catalyst selection limited. Among three commercially available catalysts evaluated in the lab, the catalyst with a designation of F21/0E75-43 was the most promising candidate. The initial judging criteria included not only the intrinsic catalyst activity but also the ability to be used effectively in a slurry reactor. The catalyst was then advanced for a 40-day life test in a laboratory 300 cc autoclave. The life test result also revealed superior stability when compared with that of a standard catalyst. Consequently, the new catalyst was recommended for demonstration in the Process Development Unit (PDU) at LaPorte, Texas. This report details the methodology of testing and selecting the catalyst.

  10. Performance and operation of the Hamm Minnelusa Sand Unit, Campbell County, Wyoming

    SciTech Connect (OSTI)

    Doll, T.E.; Hanson, M.T.

    1987-12-01

    The Hamm Minnelusa Sand Unit was discovered in 1966 and produced from the Minnelusa B sand. The field was under fluid-expansion primary recovery until water injection began in Dec. 1972. Waterflood response peaked at a higher monthly rate than that of primary recovery. Water production indicated channeling through high-permeability zones. In Oct. 1975, a volumetric-sweep improvement program was initiated into the single-injection wellbore. Anionic polyacrylamide and aluminum citrate were injected to provide in-depth vertical conformance. A second well was converted to injection in April 1976, and sweep improvement started 26 months later. The third well was converted to injection and the chemical-oil-recovery program began in Aug. 1982. The first two injectors were converted to produce water disposal at that date. The polymer-augmented waterflood was terminated in Jan. 1985. Water injection continues. This paper details flood performance up to July, 1985. Cumulative water injection is 76.6% of the total PV. A 39.5% PV chemical slug has been injected. Total recovery to data is 48.7% of the original oil in place (OOIP).

  11. New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation, Operable Unit 1-07B

    SciTech Connect (OSTI)

    Nelson, L. O.

    2007-06-12

    This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

  12. Field Sampling Plan for the Operable Units 6-05 and 10-04 Remedial Action, Phase IV

    SciTech Connect (OSTI)

    R. Wells

    2006-11-14

    This Field Sampling Plan outlines the collection and analysis of samples in support of Phase IV of the Waste Area Group 10, Operable Units 6-05 and 10-04 remedial action. Phase IV addresses the remedial actions to areas with the potential for unexploded ordnance at the Idaho National Laboratory Site. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. The remedial action consists of removal and disposal of ordnance by high-order detonation, followed by sampling to determine the extent, if any, of soil that might have been contaminated by the detonation activities associated with the disposal of ordnance during the Phase IV activities and explosives during the Phase II activities.

  13. Final Hazard Categorization for the Remediation of Six 300-FF-2 Operable Unit Solid Waste Burial Grounds

    SciTech Connect (OSTI)

    J. D. Ludowise

    2006-12-12

    This report provides the final hazard categorization (FHC) for the remediation of six solid waste disposal sites (referred to as burial grounds) located in the 300-FF-2 Operable Unit (OU) on the Hanford Site. These six sites (618-1, 618-2, 618-3, 618-7, 618-8, and 618-13 Burial Grounds) were determined to have a total radionuclide inventory (WCH 2005a, WCH 2005d, WCH 2005e and WCH 2006b) that exceeds the DOE-STD-1027 Category 3 threshold quantity (DOE 1997) and are the subject of this analysis. This FHC document examines the hazards, identifies appropriate controls to manage the hazards, and documents the FHC and commitments for the 300-FF-2 Burial Grounds Remediation Project.

  14. LITERATURE SURVEY FOR GROUNDWATER TREATMENT OPTIONS FOR NITRATE IODINE-129 AND URANIUM 200-ZP-1 OPERABLE UNIT HANFORD SITE

    SciTech Connect (OSTI)

    BYRNES ME

    2008-06-05

    This literature review presents treatment options for nitrate, iodine-129, and uranium, which are present in groundwater at the 200-ZP-I Groundwater Operable Unit (OU) within the 200 West Area of the Hanford Site. The objective of this review is to determine available methods to treat or sequester these contaminants in place (i.e., in situ) or to pump-and-treat the groundwater aboveground (i.e., ex situ). This review has been conducted with emphasis on commercially available or field-tested technologies, but theoretical studies have, in some cases, been considered when no published field data exist. The initial scope of this literature review included only nitrate and iodine-I 29, but it was later expanded to include uranium. The focus of the literature review was weighted toward researching methods for treatment of nitrate and iodine-129 over uranium because of the relatively greater impact of those compounds identified at the 200-ZP-I OU.

  15. Feasibility study for remedial action for the Quarry Residuals Operable Unit at the Weldon Spring Site, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    NONE

    1998-03-01

    The U.S. Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, which is located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis (Figure 1.1). Cleanup of the Weldon Spring site consists of several integrated components. The quarry residuals operable unit (QROU) is one of four operable units being evaluated. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, a remedial investigation/feasibility study (RI/FS) is being conducted to evaluate conditions and potential responses for the following areas and/or media that constitute the QROU: (1) the residual material (soil and sediment) remaining at the Weldon Spring quarry after removal of the bulk waste (about 11 million L [3 million gal] of uranium-contaminated ponded water was also addressed previous to bulk waste removal); (2) other media located in the surrounding vicinity of the quarry, including adjacent soil, surface water, and sediment in Femme Osage Slough and several creeks; and (3) quarry groundwater located primarily north of Femme Osage Slough. Potential impacts to the St. Charles County well field downgradient of the quarry area are also being addressed as part of QROU RI/FS evaluations. For remedial action sites, it is DOE policy to integrate values associated with the National Environmental Policy Act (NEPA) into the CERCLA decision-making process. The analyses contained herein address NEPA values as appropriate to the actions being considered for the QROU. A work plan summarizing initial site conditions and providing conceptual site hydrogeological and exposure models was published in January 1994. The RI and baseline risk assessment (BRA) reports have been completed. The RI discusses in detail the nature and extent and the fate and transport of contamination at the quarry area.

  16. Remedial Investigation/Feasibility Study Work Plan for the 200-UP-1 Groundwater Operable Unit, Hanford Site, Richland, Washington. Revision

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This work plan identifies the objectives, tasks, and schedule for conducting a Remedial Investigation/Feasibility Study for the 200-UP-1 Groundwater Operable Unit in the southern portion of the 200 West Groundwater Aggregate Area of the Hanford Site. The 200-UP-1 Groundwater Operable Unit addresses contamination identified in the aquifer soils and groundwater within its boundary, as determined in the 200 West Groundwater Aggregate Area Management Study Report (AAMSR) (DOE/RL 1992b). The objectives of this work plan are to develop a program to investigate groundwater contaminants in the southern portion of the 200 West Groundwater Aggregate Area that were designated for Limited Field Investigations (LFIs) and to implement Interim Remedial Measures (IRMs) recommended in the 200 West Groundwater AAMSR. The purpose of an LFI is to evaluate high priority groundwater contaminants where existing data are insufficient to determine whether an IRM is warranted and collect sufficient data to justify and implement an IRM, if needed. A Qualitative Risk Assessment (QRA) will be performed as part of the LFI. The purpose of an IRM is to develop and implement activities, such as contaminant source removal and groundwater treatment, that will ameliorate some of the more severe potential risks of groundwater contaminants prior to the RI and baseline Risk Assessment (RA) to be conducted under the Final Remedy Selection (FRS) at a later date. This work plan addresses needs of a Treatability Study to support the design and implementation of an interim remedial action for the Uranium-{sup 99}{Tc}-Nitrate multi-contaminant IRM plume identified beneath U Plant.

  17. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1: Main text

    SciTech Connect (OSTI)

    1996-06-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

  18. Use of GTE-65 gas turbine power units in the thermal configuration of steam-gas systems for the refitting of operating thermal electric power plants

    SciTech Connect (OSTI)

    Lebedev, A. S.; Kovalevskii, V. P.; Getmanov, E. A.; Ermaikina, N. A.

    2008-07-15

    Thermal configurations for condensation, district heating, and discharge steam-gas systems (PGU) based on the GTE-65 gas turbine power unit are described. A comparative multivariant analysis of their thermodynamic efficiency is made. Based on some representative examples, it is shown that steam-gas systems with the GTE-65 and boiler-utilizer units can be effectively used and installed in existing main buildings during technical refitting of operating thermal electric power plants.

  19. SRNL PHASE 1 ASSESSMENT OF THE WAC/DQO AND UNIT OPERATIONS FOR THE WTP WASTE QUALIFICATION PROGRAM

    SciTech Connect (OSTI)

    Peeler, D.; Adamson, D.; Bannochie, C.; Cozzi, A.; Eibling, R.; Hay, M.; Hansen, E.; Herman, D.; Martino, C.; Nash, C.; Pennebaker, F.; Poirier, M.; Reboul, S.; Stone, M.; Taylor-Pashow, K.; White, T.; Wilmarth, B.

    2012-05-16

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is currently transitioning its emphasis from a design and construction phase toward start-up and commissioning. With this transition, the WTP Project has initiated more detailed assessments of the requirements related to actual processing of the Hanford Site tank waste. One particular area of interest is the waste qualification program to be implemented to support the WTP. Given the successful implementation of similar waste qualification efforts at the Savannah River Site (SRS), based on critical technical support and guidance from the Savannah River National Laboratory (SRNL), WTP requested the utilization of subject matter experts from SRNL to support a technology exchange to perform a review of the WTP waste qualification program, discuss the general qualification approach at SRS, and to identify critical lessons learned through the support of DWPF's sludge batch qualification efforts. As part of Phase 1, SRNL subject matter experts in critical technical and/or process areas reviewed specific WTP waste qualification information. The Phase 1 review was a collaborative, interactive, and iterative process between the two organizations. WTP provided specific analytical procedures, descriptions of equipment, and general documentation as baseline review material. SRNL subject matter experts reviewed the information and, as appropriate, requested follow-up information or clarification to specific areas of interest. This process resulted in multiple teleconferences with key technical contacts from both organizations resolving technical issues that lead to the results presented in this report. This report provides the results of SRNL's Phase 1 review of the WAC-DQO waste acceptance criteria and processability parameters, and the specific unit operations which are required to support WTP waste qualification efforts. The review resulted in SRNL providing concurrence, alternative methods, or gap identification for the proposed WTP analytical methods or approaches. For the unit operations, the SRNL subject matter experts reviewed WTP concepts compared to what is used at SRS and provided thoughts on the outlined tasks with respect to waste qualification. Also documented in this report are recommendations and an outline on what would be required for the next phase to further mature the WTP waste qualification program.

  20. Installation and Operation of Sorbathene Solvent Vapor Recovery Units to Recover and Recycle Volatile Organic Compounds at Operating Sites within the Dow Chemical Company 

    E-Print Network [OSTI]

    Hall, T. L.; Larrinaga, L.

    1994-01-01

    hydrocarbons, chlorofluorocarbons (CFC's), chlorinated solvents, aromatics, and monomers. SORBATHENE units are now meeting air permit requirements for the abatement of VOC's such as benzene, acetone, trichloroethylene, trichlorofluoromethane, carbon...

  1. Waste Area Group 10, Operable Unit 10-08, Annual Monitoring Status Report for Fiscal Year 2009

    SciTech Connect (OSTI)

    Howard Forsythe

    2010-02-04

    This report documents the status of Fiscal Year 2009 groundwater monitoring performed in Waste Area Group 10 at the U.S. Department of Energy Idaho National Laboratory Site, as identified in the Groundwater Monitoring and Field Sampling Plan for Operable Unit 10-08. Twelve of the fourteen required wells were sampled, and all ten required intervals from the Westbay wells were sampled. Two wells were not sampled because they were in the process of being converted into multiple-sample-interval Westbay wells by the U.S. Geological Survey. Groundwater samples were analyzed for volatile organic compounds identified on the Contract Laboratory Program target analyte list as well as metals (filtered), anions, and radionuclides (i.e., I-129, tritium, Tc-99, gross alpha, gross beta, and Sr-90). No contaminant exceeded maximum contaminant levels in wells along the southern boundary of the Idaho National Laboratory Site or in guard wells. Iron was above its secondary maximum contaminant level of 300 ug/L in one well. The cause of the elevated iron concentration is uncertain. Lead was detected just below its action level. However, the zinc concentration was also elevated in these wells, and the source of the lead is probably galvanized riser pipe in the wells. Once the galvanized pipe is replaced, both lead and zinc concentrations should decline, as has been observed at other Waste Area Group 10 wells.

  2. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  3. Confirmatory Sampling and Analysis Plan for the Lower East Fork Poplar Creek operable unit, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1996-04-01

    On December 21, 1989, the EPA placed the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) on the National Priorities List (NPL). On January 1, 1992, a Federal Facilities Agreement (FFA) between the DOE Field Office in Oak Ridge (DOE-OR), EPA Region IV, and the Tennessee Department of Environment and Conservation (TDEC) went into effect. This FFA establishes the procedural framework and schedule by which DOE-OR will develop, coordinate, implement and monitor environmental restoration activities on the ORR in accordance with applicable federal and state environmental regulations. The DOE-OR Environmental Restoration Program for the ORR addresses the remediation of areas both within and outside the ORR boundaries. This sampling and analysis plan focuses on confirming the cleanup of the stretch of EFPC flowing from Lake Reality at the Y-12 Plant through the City of Oak Ridge, to Poplar Creek on the ORR and its associated floodplain. Both EFPC and its floodplain have been contaminated by releases from the Y-12 Plant since the mid-1950s. Because the EFPC site-designated as an ORR operable unit (OU) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) is included on the NPL, its remediation must follow the specific procedures mandated by CERCLA, as amended by the Superfund Amendments and Reauthorization Act in 1986.

  4. 20130416_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Vanderhoff, Alex

    2013-04-24

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 4/16/13.

  5. Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Vanderhoff, Alex

    2013-07-15

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 6/1/13 to 6/30/13

  6. 20140430_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    2014-05-05

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 April to 30 April 2014.

  7. Green Machine Florida Canyon Hourly Data 20130731

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Vanderhoff, Alex

    2013-08-30

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 7/1/13 to 7/31/13.

  8. Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Vanderhoff, Alex

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 6/1/13 to 6/30/13

  9. Green Machine Florida Canyon Hourly Data 20130731

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Vanderhoff, Alex

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 7/1/13 to 7/31/13.

  10. 20130416_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Vanderhoff, Alex

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 4/16/13.

  11. 20140430_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 April to 30 April 2014.

  12. April 2014: HOURLY RESEARCH TECHNICIAN

    E-Print Network [OSTI]

    April 2014: HOURLY RESEARCH TECHNICIAN 20+ HR/WK APPROPRIATE FOR UNDERGRADUATES Paleoecology and Fire Ecology Lab The University of Idaho's Paleoecology and Fire Laboratory is seeking a part in ecological research, including fire ecology, landscape ecology, paleoecology, and biogeochemistry, and who

  13. Overview of Export Laws and Regulations The United States export laws and regulations operate to restrict the use of and access to controlled

    E-Print Network [OSTI]

    Ullrich, Paul

    Overview of Export Laws and Regulations The United States export laws and regulations operate security or protection of trade. The export control regulations are not new. Federal regulations restricting the export of goods and technology out of the country have been around since the 1940's. However

  14. Sampling and analysis plan for treatment water and creek water for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1996-04-01

    This document provides the Environmental Restoration Program with information about the methodology, organizational structure, quality assurance and health and safety practices to be employed during the water sampling and analysis activities associated with the remediation of the Lower East Fork Poplar Creek Operable Unit during remediation of the National Oceanic and Atmospheric Administration and Bruner sites.

  15. Accelerating Computation of the Unit Commitment Problem (Presentation)

    SciTech Connect (OSTI)

    Hummon, M.; Barrows, C.; Jones, W.

    2013-10-01

    Production cost models (PCMs) simulate power system operation at hourly (or higher) resolution. While computation times often extend into multiple days, the sequential nature of PCM's makes parallelism difficult. We exploit the persistence of unit commitment decisions to select partition boundaries for simulation horizon decomposition and parallel computation. Partitioned simulations are benchmarked against sequential solutions for optimality and computation time.

  16. FIRST YEAR-FALL HOURS FIRST YEAR-SPRING HOURS GT 1000 FRESHMAN SEMINAR* 1

    E-Print Network [OSTI]

    Gaucher, Eric

    ELECTIVE(S) 3 TOTAL SEMESTER HOURS 15 or 16 TOTAL SEMESTER HOURS 15 or 16 FOURTH YEAR-FALL HOURS FOURTHFIRST YEAR-FALL HOURS FIRST YEAR-SPRING HOURS GT 1000 FRESHMAN SEMINAR* 1 ENGL 1101 ENGLISH YEAR-FALL HOURS SECOND YEAR-SPRING HOURS BIOL 2335 ECOLOGY OR BIOL 2354 HONORS GENETICS 3 BIOL 2337

  17. Location and Hours | ornl.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Location and Hours Location The ORNL Research Library is located off the central corridor of Bldg. 4500N on the main ORNL campus. Hours The library is open 24 hours, seven days a...

  18. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1, main text

    SciTech Connect (OSTI)

    1996-03-01

    This document is the combined Remedial Investigation/Feasibility Study (RI/FS) Report for the Clinch River/Poplar Creek Operable Unit (CR/PC OU), an off-site OU associated with environmental restoration activities at the U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR). As a result of past, present, and potential future releases of hazardous substances into the environment, the ORR was placed on the National Priorities List in December 1989 (54 FR 48184). Sites on this list must be investigated for possible remedial action, as required by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, 42 U.S.C. 9601, et seq.). This report documents the findings of the remedial investigation of this OU and the feasibility of potential remedial action alternatives. These studies are authorized by Sect. 117 of CERCLA and were conducted in accordance with the requirements of the National Contingency Plan (40 CFR Part 300). DOE, the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC) have entered into a Federal Facility Agreement (FFA), as authorized by Sect. 120 of CERCLA and Sects. 3008(h) and 6001 of the Resource Conservation and Recovery Act (RCRA) (42 U.S.C. 6901, et seq.). The purpose of this agreement is to ensure a coordinated and effective response for all environmental restoration activities occurring at the ORR. In addition to other responsibilities, the FFA parties mutually define the OU boundaries, set remediation priorities, establish remedial investigation priorities and strategies, and identify and select remedial actions. A copy of this FFA is available from the DOE Information Resource Center in Oak Ridge, Tennessee.

  19. Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 1. Main text

    SciTech Connect (OSTI)

    1995-09-01

    This is the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include {sup 137}Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and {sup 137}Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River.

  20. Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy s National Nuclear Security Administration under contract DE-AC04-94AL85000.

    E-Print Network [OSTI]

    Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department Laboratories Albuquerque, NM 87185 Fusion Power Associates Annual Meeting and Symposium Washington, DC

  1. Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water Electrolysis Production Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water Electrolysis Production...

  2. Analysis of Sub-Hourly Ramping Impacts of Wind Energy and Balancing Area Size: Preprint

    SciTech Connect (OSTI)

    Milligan, M.; Kirby, B.

    2008-06-01

    In this paper, we analyze sub-hourly ramping requirements and the benefit of combining Balancing Authority operations with significant wind penetrations.

  3. Baseline risk assessment for groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    1999-07-14

    The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are evaluating conditions in groundwater and springs at the DOE chemical plant area and the DA ordnance works area near Weldon Spring, Missouri. The two areas are located in St. Charles County, about 48 km (30 mi) west of St. Louis. The 88-ha (217-acre) chemical plant area is chemically and radioactively contaminated as a result of uranium-processing activities conducted by the U.S. Atomic Energy Commission in the 1950s and 1960s and explosives-production activities conducted by the U.S. Army (Army) in the 1940s. The 6,974-ha (17,232-acre) ordnance works area is primarily chemically contaminated as a result of trinitrotoluene (TNT) and dinitrotoluene (DNT) manufacturing activities during World War II. This baseline risk assessment (BRA) is being conducted as part of the remedial investigation/feasibility study (RUFS) required under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended. The purpose of the BRA is to evaluate potential human health and ecological impacts from contamination associated with the groundwater operable units (GWOUs) of the chemical plant area and ordnance works area. An RI/FS work plan issued jointly in 1995 by the DOE and DA (DOE 1995) analyzed existing conditions at the GWOUs. The work plan included a conceptual hydrogeological model based on data available when the report was prepared; this model indicated that the aquifer of concern is common to both areas. Hence, to optimize further data collection and interpretation efforts, the DOE and DA have decided to conduct a joint RI/BRA. Characterization data obtained from the chemical plant area wells indicate that uranium is present at levels slightly higher than background, with a few concentrations exceeding the proposed U.S. Environmental Protection Agency (EPA) maximum contaminant level (MCL) of 20 {micro}g/L (EPA 1996c). Concentrations of other radionuclides (e.g., radium and thorium) were measured at back-ground levels and were eliminated from further consideration. Chemical contaminants identified in wells at the chemical plant area and ordnance works area include nitroaromatic compounds, metals, and inorganic anions. Trichloroethylene (TCE) and 1,2-dichloroethylene (1,2 -DCE) have been detected recently in a few wells near the raffinate pits at the chemical plant.

  4. Ombuds Office Location & Hours

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesseworkSURVEY UNIVERSEHowScientificOmbuds Office Location & Hours Ombuds

  5. Analysis of an industrial cogeneration unit driven by a gas engine. Part 1: Experimental testing under full and part-load operating conditions

    SciTech Connect (OSTI)

    De Lucia, M.; Lanfranchi, C.

    1994-12-31

    This paper describes and analyzes an industrial cogeneration plant driven by a gas fueled reciprocating engine installed in a textile factory. It presents the results of experimental testing conducted under full and part-load operating conditions, as well as first-law energy considerations. The experimental tests conducted on the cogeneration unit proved the validity of the plant design and also enabled evaluation of part-load performance, which is the most common operating mode in cogeneration plants in the small-size industries which typical of central Italy.

  6. Report for Batch Leach Analyses on Sediments at 100-FR-3 Operable Unit, Boreholes C7790, C7791, and C7792

    SciTech Connect (OSTI)

    Lindberg, Michael J.

    2011-03-01

    This is a data report for CHPRC for the 100-FR-3 operable unit. Between August 15, 2010 and December 2, 2010 sediment samples were received from the 100-FR-3 Operable Unit for geochemical studies. The analyses for this project were performed at the 325 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

  7. United Technologies Corporation: Internal Audit Department (IAD) Case Study: A Case Study of the UTC ACE Operating System

    E-Print Network [OSTI]

    Roth, George

    2008-08-11

    This study of United Technologies Corporation's Internal Audit Department (IAD) examines how stability and change are important factors in how this department functions and improves. IAD is a leader in the adoption of ...

  8. Clarification of Institutional Controls at the Rocky Flats Site Central Operable Unit and Implementation of the Soil Disturbance Review Plan - 13053

    SciTech Connect (OSTI)

    DiSalvo, Rick; Surovchak, Scott; Spreng, Carl; Moritz, Vera

    2013-07-01

    Cleanup and closure of DOE's Rocky Flats Site in Colorado, which was placed on the CERCLA National Priority List in 1989, was accomplished under CERCLA, RCRA, and the Colorado Hazardous Waste Act (CHWA). The physical cleanup work was completed in late 2005 and all buildings and other structures that composed the Rocky Flats industrial complex were removed from the surface, but remnants remain in the subsurface. Other remaining features include two landfills closed in place with covers, four groundwater treatment systems, and surface water and groundwater monitoring systems. Under the 2006 Corrective Action Decision/Record of Decision for Rocky Flats Plant (US DOE) Peripheral Operable Unit and the Central Operable Unit (CAD/ROD), the response actions selected for the Central Operable Unit (OU) are institutional controls (ICs), physical controls, and continued monitoring and maintenance. The objectives of these ICs were to prevent unacceptable exposure to remaining subsurface contamination and to prevent contaminants from mobilizing to surface water and to prevent interfering with the proper functioning of the engineered components of the remedy. An amendment in 2011 of the 2006 CAD/ROD clarified the ICs to prevent misinterpretation that would prohibit work to manage and maintain the Central OU property. The 2011 amendment incorporated a protocol for a Soil Disturbance Review Plan for work subject to ICs that requires approval from the State and public notification by DOE prior to conducting approved soil-disturbing work. (authors)

  9. Feasibility study for remedial action for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    1999-07-15

    The U.S. Department of Energy (DOE) and the U.S. Department of Army (DA) are conducting an evaluation to identify the appropriate response action to address groundwater contamination at the Weldon Spring Chemical Plant (WSCP) and the Weldon Spring Ordnance Works (WSOW), respectively. The two areas are located in St. Charles County, about 48 km (30 rni) west of St. Louis. The groundwater operable unit (GWOU) at the WSCP is one of four operable units being evaluated by DOE as part of the Weldon Spring Site Remedial Action Project (WSSRAP). The groundwater operable unit at the WSOW is being evaluated by the DA as Operable Unit 2 (OU2); soil and pipeline contamination are being managed under Operable Unit 1 (OU1). Remedial activities at the WSCP and the WSOW are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. A remedial investigation/feasibility study (RI/FS) work plan summarizing initial site conditions and providing site hydrogeological and exposure models was published in August of 1995 (DOE 1995). The remedial investigation (RI) and baseline risk assessment (BRA) have also recently been completed. The RI (DOE and DA 1998b) discusses in detail the nature, extent, fate, and transport of groundwater and spring water contamination. The BRA (DOE and DA 1998a) is a combined baseline assessment of potential human health and ecological impacts and provides the estimated potential health risks and ecological impacts associated with groundwater and springwater contamination if no remedial action were taken. This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP and the WSOW. A brief description of the history and environmental setting of the sites is presented in Section 1.1, key information relative to the nature and extent of contamination is presented in Section 1.2, and the results of the BRA are summarized in Section 1.3. The objective of this FS is discussed in Section 1.4, and preliminary remediation goals are identified in Section 1.5. The organization of the remaining chapters of this FS is outlined in Section 1.6.

  10. Shutdown and low-power operation at commercial nuclear power plants in the United States. Final report

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The report contains the results of the NRC Staff`s evaluation of shutdown and low-power operations at US commercial nuclear power plants. The report describes studies conducted by the staff in the following areas: Operating experience related to shutdown and low-power operations, probabilistic risk assessment of shutdown and low-power conditions and utility programs for planning and conducting activities during periods the plant is shut down. The report also documents evaluations of a number of technical issues regarding shutdown and low-power operations performed by the staff, including the principal findings and conclusions. Potential new regulatory requirements are discussed, as well as potential changes in NRC programs. A draft report was issued for comment in February 1992. This report is the final version and includes the responses to the comments along with the staff regulatory analysis of potential new requirements.

  11. Design and operational considerations of United States commercial near-surface low-level radioactive waste disposal facilities

    SciTech Connect (OSTI)

    Birk, S.M.

    1997-10-01

    In accordance with the Low-Level Radioactive Waste Policy Amendments Act of 1985, states are responsible for providing for disposal of commercially generated low-level radioactive waste (LLW) within their borders. LLW in the US is defined as all radioactive waste that is not classified as spent nuclear fuel, high-level radioactive waste, transuranic waste, or by-product material resulting from the extraction of uranium from ore. Commercial waste includes LLW generated by hospitals, universities, industry, pharmaceutical companies, and power utilities. LLW generated by the country`s defense operations is the responsibility of the Federal government and its agency, the Department of Energy. The commercial LLRW disposal sites discussed in this report are located near: Sheffield, Illinois (closed); Maxey Flats, Kentucky (closed); Beatty, Nevada (closed); West Valley, New York (closed); Barnwell, South Carolina (operating); Richland, Washington (operating); Ward Valley, California, (proposed); Sierra Blanca, Texas (proposed); Wake County, North Carolina (proposed); and Boyd County, Nebraska (proposed). While some comparisons between the sites described in this report are appropriate, this must be done with caution. In addition to differences in climate and geology between sites, LLW facilities in the past were not designed and operated to today`s standards. This report summarizes each site`s design and operational considerations for near-surface disposal of low-level radioactive waste. The report includes: a description of waste characteristics; design and operational features; post closure measures and plans; cost and duration of site characterization, construction, and operation; recent related R and D activities for LLW treatment and disposal; and the status of the LLW system in the US.

  12. Hours of Operation MondayThursday 6am 9pm

    E-Print Network [OSTI]

    Kulp, Mark

    SENTAO ­ Using the same "Zumba music" and rhythmic steps. ZUMBA SENTAO heats up exercise by adding a hybrid of interval training and circuits, participants will complete a series of timed exercises to get a total body workout! This class is sure to get your heart pumping

  13. Safety Evaluation Report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). Supplement No. 12

    SciTech Connect (OSTI)

    Tam, P.S.

    1993-10-01

    Supplement No. 12 to the Safety Evaluation Report for the application filed by the Tennessee Valley Authority for license to operate Watts Bar Nuclear Plant, Units 1 and 2, Docket Nos. 50-390 and 50-391, located in Rhea County, Tennessee, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation of (1) additional information submitted by the applicant since Supplement No. 11 was issued, and (2) matters that the staff had under review when Supplement No. 11 was issued.

  14. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). Supplement No. 14

    SciTech Connect (OSTI)

    Tam, P.S.

    1994-12-01

    Supplement No. 14 to the Safety Evaluation Report for the application filed by the Tennessee Valley Authority for license to operate Watts Bar Nuclear Plant, Units 1 and 2, Docket Nos. 50-390 and 50-391, located in Rhea County, Tennessee, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation with additional information submitted by the applicant since Supplement No. 13 was issued, and matters that the staff had under review when Supplement No. 13 was issued.

  15. Superfund record of decision (EPA Region 4): Paducah Gaseous Diffusion Plant (USDOE), Operable Unit 15, Paducah, KY, August 10, 1998

    SciTech Connect (OSTI)

    NONE

    1998-12-01

    This decision document presents the remedial action for the Solid Waste Management Unit (SWMU) 91 of the Waste Area Group (WAG) 27 at the Paducah Gaseous Diffusion Plant (PGDP) near Paducah, Kentucky. The primary objective of this remedial action is to reduce the level of TCE-contaminated soil thereby reducing the potential future concentrations in ground water that could pose a threat to human health and the environment at the POE (i.e., the DOE property boundary). The potential for migration of the contamination from the soil of the off-site aquifer is the concern associated with the SWMU.

  16. Sampling and analysis plan for the site characterization of the waste area Grouping 1 groundwater operable unit at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    1994-11-01

    Waste Area Grouping (WAG) 1 at Oak Ridge National Laboratory (ORNL) includes all of the former ORNL radioisotope research, production, and maintenance facilities; former waste management areas; and some former administrative buildings. Site operations have contaminated groundwater, principally with radiological contamination. An extensive network of underground pipelines and utilities have contributed to the dispersal of contaminants to a known extent. In addition, karst geology, numerous spills, and pipeline leaks, together with the long and varied history of activities at specific facilities at ORNL, complicate contaminant migration-pathway analysis and source identification. To evaluate the extent of contamination, site characterization activity will include semiannual and annual groundwater sampling, as well as monthly water level measurements (both manual and continuous) at WAG 1. This sampling and analysis plan provides the methods and procedures to conduct site characterization for the Phase 1 Remedial Investigation of the WAG 1 Groundwater Operable Unit.

  17. A solid oxide fuel cell power system: 1992--1993 field operation

    SciTech Connect (OSTI)

    Veyo, S.E.; Kusunoki, A.; Takeuchi, S.; Kaneko, S.; Yokoyama, H.

    1994-05-01

    Westinghouse has deployed fully integrated, automatically controlled, packaged solid oxide fuel cell (SOFC) power generation systems in order to obtain useful customer feedback. Recently, Westinghouse has deployed 20 kW class natural gas fueled SOFC generator modules integrated into two 25 kW SOFC systems, the first with The UTILITIES, a Japanese consortium. The UTILITIES 25 kW SOFC system is the focus of this paper. The unit was shipped to the Rokko Island Test Center for Advanced Energy Systems (near Kobe, Japan) operated by Kansai Electric Power Co.; testing was initiated February 1992. Module A operated for 2601 hours at an ave output 16.6 kW dc; final shutdown was induced by current stability problems with dissipator (restart not possible because of damaged cells). Module B operated for 1579 hours at ave output 17.8 kWdc. The unit was damaged by operation at excessively high fuel utilization > 91%. It was rebuilt and returned to Rokko Island. This module B2 operated for 1843 hours on PNG; shutdown was cuased by air supply failure. After a new blower and motor were installed July 1993, the system was restarted August 5, 1993 and operated continuously until November 10, 1993, when an automatic shutdown was induced as part of a MITI licensing inspection. After restart, the unit passed 6000 hours of operation on desulfurized PNG on January 25, 1994. Westinghouse`s future plans are outlined.

  18. Work plan for the remedial investigation/feasibility study-environmental assessment for the quarry residuals operable unit at the Weldon Spring Site

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    The US Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, which is located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis. The Weldon Spring site consists of two noncontiguous areas -- the chemical plant area, which includes four raffinate pits, and the quarry. Cleanup activities at the Weldon Spring site are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, incorporating the values of the National Environmental Policy Act (NEPA). The contents of the documents prepared for the project are not intended to represent a statement regarding the legal applicability of NEPA to remedial actions conducted under CERCLA. In accordance with the integrated CERCLA/NEPA approach, a remedial investigation/feasibility study-environmental assessment (RI/FS-EA) is being conducted to evaluate conditions and potential responses for the quarry residuals operable unit (QROU). This operable unit consists of the following areas and/or media: the residual material remaining at the Weldon Spring quarry after removal of the pond water and bulk waste; underlying groundwater; and other media located in the surrounding vicinity of the quarry, including adjacent soil, surface water, and sediment in Femme Osage Slough. This work plan identifies the activities within the RI/FS-EA process that are being proposed to address contamination remaining at the quarry area.

  19. Remedial Investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODS) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regime`s, which are labeled as integrator OUs. This Remedial Investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the Feasibility Study to evaluate all probable or likely alternatives.

  20. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Supporting MELCOR calculations, Volume 6, Part 2

    SciTech Connect (OSTI)

    Kmetyk, L.N.; Brown, T.D. [Sandia National Labs., Albuquerque, NM (United States)

    1995-03-01

    To gain a better understanding of the risk significance of low power and shutdown modes of operation, the Office of Nuclear Regulatory Research at the NRC established programs to investigate the likelihood and severity of postulated accidents that could occur during low power and shutdown (LP&S) modes of operation at commercial nuclear power plants. To investigate the likelihood of severe core damage accidents during off power conditions, probabilistic risk assessments (PRAs) were performed for two nuclear plants: Unit 1 of the Grand Gulf Nuclear Station, which is a BWR-6 Mark III boiling water reactor (BWR), and Unit 1 of the Surry Power Station, which is a three-loop, subatmospheric, pressurized water reactor (PWR). The analysis of the BWR was conducted at Sandia National Laboratories while the analysis of the PWR was performed at Brookhaven National Laboratory. This multi-volume report presents and discusses the results of the BWR analysis. The subject of this part presents the deterministic code calculations, performed with the MELCOR code, that were used to support the development and quantification of the PRA models. The background for the work documented in this report is summarized, including how deterministic codes are used in PRAS, why the MELCOR code is used, what the capabilities and features of MELCOR are, and how the code has been used by others in the past. Brief descriptions of the Grand Gulf plant and its configuration during LP&S operation and of the MELCOR input model developed for the Grand Gulf plant in its LP&S configuration are given.

  1. On essential self-adjointness for magnetic Schroedinger and Pauli operators on the unit disc in R^2

    E-Print Network [OSTI]

    Gh. Nenciu; I. Nenciu

    2011-01-12

    We study the question of magnetic confinement of quantum particles on the unit disk $\\ID$ in $\\IR^2$, i.e. we wish to achieve confinement solely by means of the growth of the magnetic field $B(\\vec x)$ near the boundary of the disk. In the spinless case we show that $B(\\vec x)\\ge \\frac{\\sqrt 3}{2}\\cdot\\frac{1}{(1-r)^2}-\\frac{1}{\\sqrt 3}\\frac{1}{(1-r)^2\\ln \\frac{1}{1-r}}$, for $|\\vec x|$ close to 1, insures the confinement provided we assume that the non-radially symmetric part of the magnetic field is not very singular near the boundary. Both constants $\\frac{\\sqrt 3}{2}$ and $-\\frac{1}{\\sqrt 3}$ are optimal. This answers, in this context, an open question from Y. Colin de Verdi\\`ere and F. Truc. We also derive growth conditions for radially symmetric magnetic fields which lead to confinement of spin 1/2 particles.

  2. FINANCE DEPARTMENT Office Hours Fall 2014

    E-Print Network [OSTI]

    Gallo, Linda C.

    FINANCE DEPARTMENT Office Hours Fall 2014 NAME OFFICE HOURS COURSE # COURSE TITLE DAY TIME ROOM-1515 and by appointment FIN 323.8 FIN 323.9 FIN 323.11 FIN 326.1 Fundamentals of Finance Fundamentals of Finance Fundamentals of Finance Financial Institution Mgt TTH TTH TH TTH 0930-1045 1100-1215 1600-1840 1230-1345 GMCS

  3. University Library University Library Opening Hours

    E-Print Network [OSTI]

    Banaji,. Murad

    University Library University Library Opening Hours 5 June to 31 December 2015 www.le.ac.uk/library Access during non staffed service hours is with a valid Library card and access after midnight is for University of Leicester students and staff only. Friday 5 June to Sunday 27 September 2015 except Public

  4. RESULTS FROM ANALYSIS OF THE FIRST AND SECOND STRIP EFFLUENT COALESCER ELEMENTS FROM RADIOACTIVE OPERATIONS OF THE MODULAR CAUSTIC-SIDE SOLVENT EXTRACTION UNIT

    SciTech Connect (OSTI)

    Peters, T.; Fondeur, F.; Fink, S.

    2011-06-28

    The coalescer elements for the Strip Effluent (SE) acid within the Modular Caustic-Side Solvent Extraction Unit (MCU) experienced elevated differential pressure drop during radioactive operations. Following the end of operations for the first Macrobatch campaign and soon after start of the second Macrobatch campaign, personnel removed the coalescer media and provided to Savannah River National Laboratory (SRNL) for diagnostic investigation of the causes of reduced flow. This report summarizes those studies. Two Strip Effluent (SE) coalescers were delivered to the Savannah River National Laboratory (SRNL). One was removed from the Modular Caustic-Side Solvent Extraction Unit (MCU) between processing of Macrobatch 1 and 2 (coalescer 'Alpha'), and the second was removed from MCU after processing of {approx}24,000 gallons of salt solution (coalescer 'Beta'). Both coalescers underwent the same general strip acid flush program to reduce the dose and were delivered to SRNL for analysis of potential occluding solids. Analysis of Coalescer Alpha indicates the presence of aluminum hydroxide solids and aluminosilicate solids, while analysis of Coalescer Beta indicates the presence of aluminum hydroxide solids, but no aluminosilicates. Leaching studies on sections of both coalescers were performed. The results indicate that the coalescers had different amounts of solids present on them at the time of removal. Finally, samples of free liquids retrieved from both coalescers indicate no excessive amounts of CSSX solvent present. Given the strip acid flushing that occurred in the SE coalescers, the solids we detected on the coalescers are probably indicative of a larger quantity of these solids present before the strip acid flushing. Under this scenario, the excessive pressure drops are due to the solids and not from organic fouling.

  5. General Education Coursework: Credit Hours General Education Coursework: Credit Hours MATH 211 4 MATH 212 4

    E-Print Network [OSTI]

    General Education Coursework: Credit Hours General Education Coursework: Credit Hours MATH 211 4 ENGN 110 2 CEE 111 2 Human Creativity 3 General Education Coursework: Credit Hours General Education CEE 4XX - Transportation or Environmental 3 ENGN 401 1 ENMA 480** 3 CEE 402 1 Upper Division General

  6. Remedial investigation/feasibility study of the Clinch River/Poplar Creek Operable Unit. Volume 2. Biota and representative concentrations of contaminants. Appendixes A, B, C, D

    SciTech Connect (OSTI)

    NONE

    1996-03-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OU`s). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

  7. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 3: Appendixes E and F -- Risk assessment information

    SciTech Connect (OSTI)

    1996-06-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

  8. Remedial investigation/feasibility study of the Clinch River/Poplar Creek Operable Unit. Volume 3. Risk assessment information. Appendixes E, F

    SciTech Connect (OSTI)

    1996-03-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is Volume 3 of the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

  9. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.

  10. Remedial Investigation Work Plan for Chestnut Ridge Operable Unit 1 (Chestnut Ridge Security Pits) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    This Remedial Investigation (RI) Work Plan specifically addresses Chestnut Ridge Operable Unit 1, (OU1) which consists of the Chestnut Ridge Security Pits (CRSP). The CRSP are located {approximately}800 ft southeast of the central portion of the Y-12 Plant atop Chestnut Ridge, which is bounded to the northwest by Bear Creek Valley and to the southeast by Bethel Valley. Operated from 1973 to 1988, the CRSP consisted of a series of trenches used for the disposal of classified hazardous and nonhazardous waste materials. Disposal of hazardous waste materials was discontinued in December 1984, while nonhazardous waste disposal ended on November 8, 1988. An RI is being conducted at this site in response to CERCLA regulations. The overall objectives of the RI are to collect data necessary to evaluate the nature and extent of contaminants of concern (COC), support an ecological risk assessment (ERA) and a human health risk assessment (HHRA), support the evaluation of remedial alternatives, and ultimately develop a Record of Decision for the site. The purpose of this Work Plan is to outline RI activities necessary to define the nature and extent of suspected contaminants at Chestnut Ridge OU1. Potential migration pathways also will be investigated. Data collected during the RI will be used to evaluate the overall risk posed to human health and the environment by OU1.

  11. Storing hydroelectricity to meet peak-hour demand

    SciTech Connect (OSTI)

    Valenti, M.

    1992-04-01

    This paper reports on pumped storage plants which have become an effective way for some utility companies that derive power from hydroelectric facilities to economically store baseload energy during off-peak hours for use during peak hourly demands. According to the Electric Power Research Institute (EPRI) in Palo Alto, Calif., 36 of these plants provide approximately 20 gigawatts, or about 3 percent of U.S. generating capacity. During peak-demand periods, utilities are often stretched beyond their capacity to provide power and must therefore purchase it from neighboring utilities. Building new baseload power plants, typically nuclear or coal-fired facilities that run 24 hours per day seven days a week, is expensive, about $1500 per kilowatt, according to Robert Schainker, program manager for energy storage at the EPRI. Schainker the that building peaking plants at $400 per kilowatt, which run a few hours a day on gas or oil fuel, is less costly than building baseload plants. Operating them, however, is more expensive because peaking plants are less efficient that baseload plants.

  12. “Friday off”: Reducing Working Hours in Europe

    E-Print Network [OSTI]

    Kallis, Giorgos

    This article explores the pros and cons for reducing working hours in Europe. To arrive to an informed judgment we review critically the theoretical and empirical literature, mostly from economics, concerning the relation ...

  13. LIQUID PHASE FISCHER-TROPSCH (III & IV) DEMONSTRATION IN THE LAPORTE ALTERNATIVE FUELS DEVELOPMENT UNIT. Final Topical Report. Volume I/II: Main Report. Task 1: Engineering Modifications (Fischer-Tropsch III & IV Demonstration) and Task 2: AFDU Shakedown, Operations, Deactivation (Shut-Down) and Disposal (Fischer-Tropsch III & IV Demonstration).

    SciTech Connect (OSTI)

    Bharat L. Bhatt

    1999-06-01

    Slurry phase Fischer-Tropsch technology was successfully demonstrated in DOE's Alternative Fuels Development Unit (AFDU) at LaPorte, Texas. Earlier work at LaPorte, with iron catalysts in 1992 and 1994, had established proof-of-concept status for the slurry phase process. The third campaign (Fischer-Tropsch III), in 1996, aimed at aggressively extending the operability of the slurry reactor using a proprietary cobalt catalyst. Due to an irreversible plugging of catalyst-wax separation filters as a result of unexpected catalyst fines generation, the operations had to be terminated after seven days on-stream. Following an extensive post-run investigation by the participants, the campaign was successfully completed in March-April 1998, with an improved proprietary cobalt catalyst. These runs were sponsored by the U. S. Department of Energy (DOE), Air Products & Chemicals, Inc., and Shell Synthetic Fuels, Inc. (SSFI). A productivity of approximately 140 grams (gm) of hydrocarbons (HC)/ hour (hr)-liter (lit) of expanded slurry volume was achieved at reasonable system stability during the second trial (Fischer-Tropsch IV). The productivity ranged from 110-140 at various conditions during the 18 days of operations. The catalyst/wax filters performed well throughout the demonstration, producing a clean wax product. For the most part, only one of the four filter housings was needed for catalyst/wax filtration. The filter flux appeared to exceed the design flux. A combination of use of a stronger catalyst and some innovative filtration techniques were responsible for this success. There was no sign of catalyst particle attrition and very little erosion of the slurry pump was observed, in contrast to the Fischer-Tropsch III operations. The reactor operated hydrodynamically stable with uniform temperature profile and gas hold-ups. Nuclear density and differential pressure measurements indicated somewhat higher than expected gas hold-up (45 - 50 vol%) during Fischer-Tropsch IV operations. The high gas hold-up was confirmed by a dynamic gas disengagement test conducted at the end of the run. Heat transfer in the reactor was better than expected. Heat, mass and elemental balance calculations indicated excellent closure. After the initial learning curve with system dynamics, the plant was restarted very quickly (24 hours and 17 hours) following two plant trips. This demonstrates the ease and flexibility of the slurry technology. In-situ reduction of catalyst pre-cursor was completed successfully during F-T IV operations. Water measurements proved to be inaccurate due to wax/oil contamination of the analytical system. However, the reduction appeared to proceed well as close to expected syngas conversion was obtained at the beginning of the run. The selectivity to wax was lower than expected, with higher methane selectivity. Returning to the baseline condition indicated a productivity decline from 135-140 to 125-130 gm HC/hr-lit. of reactor volume in two weeks of operation. This may be a result of some catalyst loss from the reactor as well as initial catalyst deactivation. Significant quantities of product and samples were collected for further processing and analysis by the participants. Gas, liquid and solid phase mixing were studied as planned at two operating conditions using radioactive materials. A large amount of data were collected by ICI Tracerco using 43 detectors around the reactor. The data are being analyzed by Washington University as part of the Hydrodynamic Program with DOE.

  14. Remedial investigation work plan for Chestnut Ridge Operable Unit 4 (Rogers Quarry/Lower McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The Oak Ridge Y-12 Plant includes - 800 acres near the northeast comer of the reservation and adjacent to the city of Oak Ridge (Fig. 1-1). The plant is a manufacturing and developmental engineering facility that produced components for various nuclear weapons systems and provides engineering support to other Energy Systems facilities. More than 200 contaminated sites have been identified at the Y-12 Plant that resulted from past waste management practices. Many of the sites have operable units (OUs) based on priority and on investigative and remediation requirements. This Remedial Investigation RI work plan specifically addresses Chestnut Ridge OU 4. Chestnut Ridge OU 4 consists of Rogers Quarry and Lower McCoy Branch (MCB). Rogers Quarry, which is also known as Old Rogers Quarry or Bethel Valley Quarry was used for quarrying from the late 1940s or early 1950s until about 1960. Since that time, the quarry has been used for disposal of coal ash and materials from Y-12 production operations, including classified materials. Disposal of coal ash ended in July 1993. An RI is being conducted at this site in response to CERCLA regulations. The overall objectives of the RI are to collect data necessary to evaluate the nature and extent of contaminants of concern, support an Ecological Risk Assessment and a Human Health Risk Assessment, support the evaluation of remedial alternatives, and ultimately develop a Record of Decision for the site. The purpose of this work plan is to outline RI activities necessary to define the nature and extent of suspected contaminants at Chestnut Ridge OU 4. Potential migration pathways also will be investigated. Data collected during the RI will be used to evaluate the risk posed to human health and the environment by OU 4.

  15. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1. Volume 5: Analysis of core damage frequency from seismic events for plant operational state 5 during a refueling outage

    SciTech Connect (OSTI)

    Budnitz, R.J. [Future Resources Associates, Inc., Berkeley, CA (United States); Davis, P.R. [PRD Consulting (United States); Ravindra, M.K.; Tong, W.H. [EQE International, Inc., Irvine, CA (United States)

    1994-08-01

    In 1989 the US Nuclear Regulatory Commission (NRC) initiated an extensive program to examine carefully the potential risks during low-power and shutdown operations. The program included two parallel projects, one at Sandia National Laboratories studying a boiling water reactor (Grand Gulf), and the other at Brookhaven National Laboratory studying a pressurized water reactor (Surry Unit 1). Both the Sandia and Brookhaven projects have examined only accidents initiated by internal plant faults---so-called ``internal initiators.`` This project, which has explored the likelihood of seismic-initiated core damage accidents during refueling outage conditions, is complementary to the internal-initiator analyses at Brookhaven and Sandia. This report covers the seismic analysis at Grand Gulf. All of the many systems modeling assumptions, component non-seismic failure rates, and human effort rates that were used in the internal-initiator study at Grand Gulf have been adopted here, so that the results of the study can be as comparable as possible. Both the Sandia study and this study examine only one shutdown plant operating state (POS) at Grand Gulf, namely POS 5 representing cold shutdown during a refueling outage. This analysis has been limited to work analogous to a level-1 seismic PRA, in which estimates have been developed for the core-damage frequency from seismic events during POS 5. The results of the analysis are that the core-damage frequency for earthquake-initiated accidents during refueling outages in POS 5 is found to be quite low in absolute terms, less than 10{sup {minus}7}/year.

  16. Remedial Investigation Work Plan for Chestnut Ridge Operable Unit 1 (Chestnut Ridge Security Pits) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This document outlines the activities necessary to conduct a Remedial Investigation (RI) of the Chestnut Ridge Security Pits (CRSP) at the Oak Ridge Y-12 Plant. The CRSP, also designated Chestnut Ridge Operable Unit (OU) 1, is one of four OUs along Chestnut Ridge on the Oak Ridge Reservation (ORR). The purpose of the RI is to collect data to (1) evaluate the nature and extent of known and suspected contaminants, (2) support an Ecological Risk Assessment (ERA) and a Human Health Risk Assessment (HHRA), (3) support the feasibility study in the development and analysis of remedial alternatives, and (4) ultimately, develop a Record of Decision (ROD) for the site. This chapter summarizes the regulatory background of environmental investigation on the ORR and the approach currently being followed and provides an overview of the RI to be conducted at the CRSP. Subsequent chapters provide details on site history, sampling activities, procedures and methods, quality assurance (QA), health and safety, and waste management related to the RI.

  17. Remedial investigation concept plan for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    NONE

    1999-07-15

    The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are conducting cleanup activities at two properties--the DOE chemical plant area and the DA ordnance works area (the latter includes the training area)--located in the Weldon Spring area in St. Charles County, Missouri. These areas are on the National Priorities List (NPL), and cleanup activities at both areas are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE and DA are conducting a joint remedial investigation (RI) and baseline risk assessment (BRA) as part of the remedial investigation/feasibility study (RI/FS) for the groundwater operable units for the two areas. This joint effort will optimize further data collection and interpretation efforts and facilitate overall remedial decision making since the aquifer of concern is common to both areas. A Work Plan issued jointly in 1995 by DOE and the DA discusses the results of investigations completed at the time of preparation of the report. The investigations were necessary to provide an understanding of the groundwater system beneath the chemical plant area and the ordnance works area. The Work Plan also identifies additional data requirements for verification of the evaluation presented.

  18. Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory

    SciTech Connect (OSTI)

    Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

    1993-07-01

    This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

  19. Relationships among Perceived Working Hours, General Stress, Work Centrality, Job Control, Job Demands, and Work Condition Constraints 

    E-Print Network [OSTI]

    Kim, Se Hoon

    2014-06-27

    the relationships among perceived working hours, general stress, work centrality, job control, job demands, and work condition constraints for full-time employees in the United States and Korea. A self-administered questionnaire survey approach was used to collect...

  20. 20131201-1231_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    2014-01-08

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Dec to 31 Dec 2013.

  1. 20140201-0228_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    2014-03-03

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Feb to 28 Feb 2014.

  2. 20140301-0331_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    2014-04-07

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Mar to 31 Mar 2014.

  3. 20131001-1031_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    2013-11-05

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 1 Oct 2013 to 31 Oct 2013.

  4. 20130501-20130531_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Vanderhoff, Alex

    2013-06-18

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from May 2013

  5. 20140101-0131_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    2014-02-03

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Jan to 31 Jan 2014.

  6. 20130901-0930_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    2013-10-25

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 1 September 2013 to 30 September 2013.

  7. 20131101-1130_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    2013-12-02

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Nov to 30 Nov 2013.

  8. 20140601-0630_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    2014-06-30

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 June to 30 June 2014.

  9. 20130801-0831_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Vanderhoff, Alex

    2013-09-10

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 8/1/13 to 8/31/13.

  10. 20140701-0731_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    2014-07-31

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 July to 31 July 2014.

  11. 20140501-0531_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    2014-06-02

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 May to 31 May 2014.

  12. 20140501-0531_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 May to 31 May 2014.

  13. 20140101-0131_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Jan to 31 Jan 2014.

  14. 20130501-20130531_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Vanderhoff, Alex

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from May 2013

  15. 20130901-0930_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 1 September 2013 to 30 September 2013.

  16. 20131001-1031_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 1 Oct 2013 to 31 Oct 2013.

  17. 20140301-0331_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Mar to 31 Mar 2014.

  18. 20131201-1231_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Dec to 31 Dec 2013.

  19. 20140701-0731_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 July to 31 July 2014.

  20. 20130801-0831_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Vanderhoff, Alex

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 8/1/13 to 8/31/13.

  1. 20140201-0228_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Feb to 28 Feb 2014.

  2. 20140601-0630_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 June to 30 June 2014.

  3. 20131101-1130_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Thibedeau, Joe

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Nov to 30 Nov 2013.

  4. UNIT DAMAGE ASSESSMENT -OFFICES & GENERAL OPERATIONS Fax completed form to EH&S at 561-297-2210, e-mail to ehs@fau.edu, or hand deliver to EH&S offices.

    E-Print Network [OSTI]

    Fernandez, Eduardo

    UNIT DAMAGE ASSESSMENT - OFFICES & GENERAL OPERATIONS Fax completed form to EH&S at 561-297-2210, e: ___________________ Category Description (Brief description of damage) Condition* Electrical Equip. Computers Printers Monitors on the following: Good No Damage Fair Damage appears superficial, can be used as is Moderate Damage appears

  5. Studentnumber:Name:Degree: Unit:Unit:Unit:Unit

    E-Print Network [OSTI]

    Tobar, Michael

    Studentnumber:Name:Degree: Semester: Semester: Unit:Unit:Unit:Unit: Unit:Unit:Unit:Unit: Year the Undergraduate Degree Course Rules. Have you included units that will lead to at least one degree-specific major that the units you choose in first year will lead to at least one degree-specific major. It is a requirement

  6. Project Management Foundation 21 hours, $895

    E-Print Network [OSTI]

    Alabama in Huntsville, University of

    are covered in the foundation course: defining requirements, schedules, risk management, and change controlProject Management Foundation 21 hours, $895 The fundamental project management processes. In group exercises, participants gain an understanding of how the project management processes are used

  7. Health Promotion Graduate Student Coordinator 15-20 hours/week $18/hour (pending approval)

    E-Print Network [OSTI]

    Lafferriere, Gerardo

    Health Promotion Graduate Student Coordinator 15-20 hours/week $18/hour (pending approval year. The Graduate Student Coordinator for Health Promotion is responsible for assisting the Fitness & Health Promotion Coordinator in the development, promotion, management and implementation of Campus Rec

  8. REAL TIME SYSTEM OPERATIONS 2006-2007

    E-Print Network [OSTI]

    Eto, Joseph H.

    2008-01-01

    Security Constrained  Unit Commitment (SCUC) and Security Security Constrained Unit Commitment (SCUC) and Securityin CA ISO’s Unit Commitment Operating Procedures) - Load

  9. Renewable Electricity Futures for the United States

    SciTech Connect (OSTI)

    Mai, Trieu; Hand, Maureen; Baldwin, Sam F.; Wiser , Ryan; Brinkman, G.; Denholm, Paul; Arent, Doug; Porro, Gian; Sandor, Debra; Hostick, Donna J.; Milligan, Michael; DeMeo, Ed; Bazilian, Morgan

    2014-04-14

    This paper highlights the key results from the Renewable Electricity (RE) Futures Study. It is a detailed consideration of renewable electricity in the United States. The paper focuses on technical issues related to the operability of the U. S. electricity grid and provides initial answers to important questions about the integration of high penetrations of renewable electricity technologies from a national perspective. The results indicate that the future U. S. electricity system that is largely powered by renewable sources is possible and the further work is warranted to investigate this clean generation pathway. The central conclusion of the analysis is that renewable electricity generation from technologies that are commercially available today, in combination with a more flexible electric system, is more than adequate to supply 80% of the total U. S. electricity generation in 2050 while meeting electricity demand on an hourly basis in every region of the United States.

  10. Computational Methods in Engineering (4 units) Class/Laboratory Schedule: four hours of lecture, eight hours outside preparation.

    E-Print Network [OSTI]

    Fainman, Yeshaiahu

    for Engineers Catalog Description: Introduction to computers and computing with Matlab; numerical linear algebra the design and application of numerical methods for solving mathematical models of problems in engineering to existing code. (7g, 8h, 10j, 11k) Course Topics: 1. Introduction to numerical computation and computer

  11. Aerodynamics (4 units) Class/Laboratory Schedule: four lecture hours per week, three lab, and five hours outside

    E-Print Network [OSTI]

    Fainman, Yeshaiahu

    and bodies at subsonic and supersonic speeds. Thin-wing theory. Slender-body theory. Formulation of theories for the evaluation of forces and moments on airplane geometries. Application to the design of high-speed airplanes principles of the design of airplane components 4.2 Students will demonstrate the ability to apply principles

  12. Heat Transfer (4 units) Class/Laboratory Schedule: four lecture hours per week, eight hours outside preparation. 12

    E-Print Network [OSTI]

    Fainman, Yeshaiahu

    to heat transfer in ducts and external boundary layers. Introduction to heat conduction and radiation and radiative heat transfer 1.2 Students will be able to recognize applications in which heat transfer transfer by radiation Objective 3 3.1 Students will demonstrate the ability to analyze heat exchangers 3

  13. Nuclear Operations Application to Environmental Restoration at Corrective Action Unit 547, Miscellaneous Contaminated Waste Sites, at the Nevada National Security Site

    SciTech Connect (OSTI)

    Kevin Cabble (NSO), Mark Krauss and Patrick Matthews (N-I)

    2011-03-03

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office has responsibility for environmental restoration at the Nevada National Security Site (formerly the Nevada Test Site). This includes remediation at locations where past testing activities have resulted in the release of plutonium to the environment. One of the current remediation efforts involves a site where an underground subcritical nuclear safety test was conducted in 1964. The underground test was vented through a steel pipe to the surface in a closed system where gas samples were obtained. The piping downstream of the gas-sampling apparatus was routed belowground to a location where it was allowed to vent into an existing radioactively contaminated borehole. The length of the pipe above the ground surface is approximately 200 meters. This pipe remained in place until remediation efforts began in 2007, at which time internal plutonium contamination was discovered. Following this discovery, an assessment was conducted to determine the quantity of plutonium present in the pipe. This site has been identified as Corrective Action Unit (CAU) 547, Miscellaneous Contaminated Waste Sites. The quantity of plutonium identified at CAU 547 exceeded the Hazard Category 3 threshold but was below the Hazard Category 2 threshold specified in DOE Standard DOE-STD-1027-92. This CAU, therefore, was initially categorized as a Hazard Category 3 environmental restoration site. A contaminated facility or site that is initially categorized as Hazard Category 3, however, may be downgraded to below Hazard Category 3 if it can be demonstrated through further analysis that the form of the material and the energy available for release support reducing the hazard category. This is an important consideration when performing hazard categorization of environmental restoration sites because energy sources available for release of material are generally fewer at an environmental restoration site than at an operating facility and environmental restoration activities may result in the complete removal of source material.

  14. Sandia Energy - SSLS Coffee/Dessert Hour Calendar of Topics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SSLS CoffeeDessert Hour Calendar of Topics Home Energy Research EFRCs Solid-State Lighting Science EFRC SSLS CoffeeDessert Hour Calendar of Topics SSLS CoffeeDessert Hour...

  15. Teaching Direct Marketing and Small Farm Viability: Resources for Instructors, 2nd Edition. Unit 6 - Building Resilience: Small Farm Planning and Operations

    E-Print Network [OSTI]

    2015-01-01

    A thorough introduction to business planning for sustainablebased approach to business planning. Fedie, Donald M. andrecord keeping, business planning and taxes. Unit 6.0 | 235

  16. DOE's Office of Science Awards 95 Million Hours of Supercomputing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE's Office of Science Awards 95 Million Hours of Supercomputing Time to Advance Research in Science, Academia and Industry DOE's Office of Science Awards 95 Million Hours of...

  17. Household Energy Consumption Segmentation Using Hourly Data

    SciTech Connect (OSTI)

    Kwac, J; Flora, J; Rajagopal, R

    2014-01-01

    The increasing US deployment of residential advanced metering infrastructure (AMI) has made hourly energy consumption data widely available. Using CA smart meter data, we investigate a household electricity segmentation methodology that uses an encoding system with a pre-processed load shape dictionary. Structured approaches using features derived from the encoded data drive five sample program and policy relevant energy lifestyle segmentation strategies. We also ensure that the methodologies developed scale to large data sets.

  18. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1. Volume 2, Part 1C: Analysis of core damage frequency from internal events for plant operational State 5 during a refueling outage, Main report (Sections 11--14)

    SciTech Connect (OSTI)

    Whitehead, D. [Sandia National Labs., Albuquerque, NM (United States); Darby, J. [Science and Engineering Associates, Inc., Albuquerque, NM (United States); Yakle, J. [Science Applications International Corp., Albuquerque, NM (United States)] [and others

    1994-06-01

    This document contains the accident sequence analysis of internally initiated events for Grand Gulf, Unit 1 as it operates in the Low Power and Shutdown Plant Operational State 5 during a refueling outage. The report documents the methodology used during the analysis, describes the results from the application of the methodology, and compares the results with the results from two full power analyses performed on Grand Gulf.

  19. Requirements for Undergraduate Certificate in Gerontology 18 semester hours total -all courses are 3 semester hours

    E-Print Network [OSTI]

    Frantz, Kyle J.

    Aging Policy and Services SW 4260 Aging Practice, Policy and Research 2. Elective courses (3 hours) o in Section 1 above) GERO 4700 Special Topics in Gerontology GERO 4910 Directed Study in Gerontology SW

  20. New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B

    SciTech Connect (OSTI)

    L. O. Nelson

    2003-09-01

    This operations and maintenance plan supports the New Pump and Treat Facility (NPTF) remedial action work plan and identifies the approach and requirements for the operations and maintenance activities specific to the final medical zone treatment remedy. The NPTF provides the treatment system necessary to remediate the medical zone portion of the OU 1-07B contaminated groundwater plume. Design and construction of the New Pump and Treat Facility is addressed in the NPTF remedial action work plan. The scope of this operation and maintenance plan includes facility operations and maintenance, remedy five-year reviews, and the final operations and maintenance report for the NPTF.

  1. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Analysis of core damage frequency from internal events for Plant Operational State 5 during a refueling outage. Volume 2, Part 3: Internal Events Appendices I and J

    SciTech Connect (OSTI)

    Yakle, J. [Science Applications International Corp., Albuquerque, NM (United States); Darby, J. [Science and Engineering Associates, Inc., Albuquerque, NM (United States); Whitehead, D.; Staple, B. [Sandia National Labs., Albuquerque, NM (United States)

    1994-06-01

    This report provides supporting documentation for various tasks associated with the performance of the probablistic risk assessment for Plant Operational State 5 during a refueling outage at Grand Gulf, Unit 1 as documented in Volume 2, Part 1 of NUREG/CR-6143.

  2. Fermilab | Visit Fermilab | Hours, Maps and Directions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory ofDid you not find whatGasEnergyfeature photoTheory Chalkboard /Hours, Maps

  3. Hour of Code | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation CurrentHenry Bellamy, Ph.D.Food Drive HolidayHours UsedFire 1 in 3 students in

  4. Teaching Direct Marketing and Small Farm Viability: Resources for Instructors, 2nd Edition. Unit 6 - Building Resilience: Small Farm Planning and Operations

    E-Print Network [OSTI]

    2015-01-01

    important place to go to find new materials. Unit 6.0 | 237new asset on your tax return, valued at the sum of the costs of all the labor and materials

  5. EA-0821: Operation of the Glass Melter Thermal Treatment Unit at the U.S. Department of Energy's Mound Plant, Miamisburg, Ohio

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to use an existing glass melter thermal treatment unit (also known as a Penberthy Pyro-Converter joule-heated glass furnace) for the...

  6. Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration

    E-Print Network [OSTI]

    Langerhans, Brian

    , for the United States Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL; determining rate of spread and social network for smallpox epidemic in Abakaliki, Nigeria (1972) · Studying

  7. United Biofuels Private Limited | Open Energy Information

    Open Energy Info (EERE)

    United Biofuels Private Limited Jump to: navigation, search Name: United Biofuels Private Limited Place: Tamil Nadu, India Sector: Biomass Product: India-based owner and operator...

  8. Chinese Major (Thirty Credit Hours) 1. Fifteen credit hours of Chinese language at or above 100-level (must include CHIN 101,

    E-Print Network [OSTI]

    Hayden, Nancy J.

    Worksheet Chinese Major (Thirty Credit Hours) 1. Fifteen credit hours of Chinese language hours) CHIN 296 (3 credit hours) 2. Fifteen credit hours of Chinese history and culture (must include WLIT 110) a. 3 credit hours of Chinese literature WLIT 110 (3 credit hours) b. 6 credit hours at any

  9. Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration

    E-Print Network [OSTI]

    Siefert, Chris

    , for the United States Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL objects. ­ Application provides simple functions to answer queries. ­ Small extra costs in memory_Set_Fn) COMPUTE Move data (Zoltan_Migrate) Clean up (Zoltan_Destroy) APPLICATION Zoltan_LB_Partition: · Call query

  10. Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration

    E-Print Network [OSTI]

    Sidiropoulos, Nikolaos D.

    , for the United States Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL of Western Ontario TRICAP June 5, 2006 Improvements to 3-way DEDICOM for Applications in Social Network applications - Study asymmetries in telephone calls among cities - Marketing research · car "switching" - car

  11. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Appendices A--D. Volume 2, Part 2

    SciTech Connect (OSTI)

    Chu, T.L.; Musicki, Z.; Kohut, P. [Brookhaven National Lab., Upton, NY (United States)] [and others

    1994-06-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the Potential risks during low Power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the Plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. We recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown. Procedures written specifically for shutdown accidents would be useful. This document, Volume 2, Pt. 2 provides appendices A through D of this report.

  12. 1999 Commercial Buildings Characteristics--Off-Hour Equipment...

    U.S. Energy Information Administration (EIA) Indexed Site

    such programs (Figure 1). About the same amount of floorspace had either heating system or cooling system off-hour reduction. Off-hour reduction was least for office...

  13. DOE's Office of Science Awards 18 Million Hours of Supercomputing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE's Office of Science Awards 18 Million Hours of Supercomputing Time to 15 Teams for Large-Scale Scientific Computing DOE's Office of Science Awards 18 Million Hours of...

  14. FISHERY STATISTICS UNITED STATES

    E-Print Network [OSTI]

    FISHERY STATISTICS OF THE UNITED STATES 1972 STATISTICAL DIGEST NO. 66 Prepared by STATISTICS;ACKNOWLEDGMENTS The data in this edition of "Fishery Statistics of the United States" were collected in co- operation with the various States and tabulated by the staff of the Statistics and Market News Division

  15. Central Eurasian Studies (CEUS) Uzbek Coffee & Conversation Hour

    E-Print Network [OSTI]

    Robeson, Scott M.

    (314 E. Kirkwood Avenue) Finnish Coffee & Conversation Hour WEDNESDAYS, 5:30-6:30 pm, IMU Starbucks, IMU Starbucks Tibetan Tea & Conversation Hour THURSDAYS, 6:00-7:00 pm, Anyetsang's Little Tibet Restaurant (415 E. 4th Street) Turkish Coffee & Conversation Hour FRIDAYS, 1:00-2:00 pm, IMU Starbucks Uyghur

  16. Results and insights of internal fire and internal flood analyses of the Surry Unit 1 Nuclear Power Plant during mid-loop operations

    SciTech Connect (OSTI)

    Chu, Tsong-Lun; Musicki, Z.; Kohut, P.

    1995-12-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). The objectives of the program are to assess the risks of severe accidents initiated during plant operational states (POSs) other than full power operation and to compare the estimated core damage frequencies (CDFs), important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a Level 3 PRA for internal events and a Level 1 PRA for seismically induced and internal fire and flood induced core damage sequences. This paper summarizes the results and highlights of the internal fire and flood analysis documented in Volumes 3 and 4 of NUREG/CR-6144 performed for the Surry plant during mid-loop operation.

  17. Impact of SMES on unit availability and power system reliability 

    E-Print Network [OSTI]

    Nasr, Hala Hector

    1991-01-01

    ) f, Here iaavg is the weighted average hourly load, avg is the average hourly load over the week, e is the round-trip c%cicncy of SMES, lil(l) is the load as a function of time, a is the time of the. beginning of the wcck, b is the tiiiie ol... ? ' -period oprratinrg hours per *tart (2. 2) whee. e: rrulnher of operating holies , serutcc factor- pcrlod aINl number of operating hours operating hours per start number of su r re s s f ul . starts and period is the period ol' study = 1 year...

  18. Integrating Solar PV in Utility System Operations

    SciTech Connect (OSTI)

    Mills, A.; Botterud, A.; Wu, J.; Zhou, Z.; Hodge, B-M.; Heany, M.

    2013-10-31

    This study develops a systematic framework for estimating the increase in operating costs due to uncertainty and variability in renewable resources, uses the framework to quantify the integration costs associated with sub-hourly solar power variability and uncertainty, and shows how changes in system operations may affect these costs. Toward this end, we present a statistical method for estimating the required balancing reserves to maintain system reliability along with a model for commitment and dispatch of the portfolio of thermal and renewable resources at different stages of system operations. We estimate the costs of sub-hourly solar variability, short-term forecast errors, and day-ahead (DA) forecast errors as the difference in production costs between a case with “realistic” PV (i.e., subhourly solar variability and uncertainty are fully included in the modeling) and a case with “well behaved” PV (i.e., PV is assumed to have no sub-hourly variability and can be perfectly forecasted). In addition, we highlight current practices that allow utilities to compensate for the issues encountered at the sub-hourly time frame with increased levels of PV penetration. In this analysis we use the analytical framework to simulate utility operations with increasing deployment of PV in a case study of Arizona Public Service Company (APS), a utility in the southwestern United States. In our analysis, we focus on three processes that are important in understanding the management of PV variability and uncertainty in power system operations. First, we represent the decisions made the day before the operating day through a DA commitment model that relies on imperfect DA forecasts of load and wind as well as PV generation. Second, we represent the decisions made by schedulers in the operating day through hour-ahead (HA) scheduling. Peaking units can be committed or decommitted in the HA schedules and online units can be redispatched using forecasts that are improved relative to DA forecasts, but still imperfect. Finally, we represent decisions within the operating hour by schedulers and transmission system operators as real-time (RT) balancing. We simulate the DA and HA scheduling processes with a detailed unit-commitment (UC) and economic dispatch (ED) optimization model. This model creates a least-cost dispatch and commitment plan for the conventional generating units using forecasts and reserve requirements as inputs. We consider only the generation units and load of the utility in this analysis; we do not consider opportunities to trade power with neighboring utilities. We also do not consider provision of reserves from renewables or from demand-side options. We estimate dynamic reserve requirements in order to meet reliability requirements in the RT operations, considering the uncertainty and variability in load, solar PV, and wind resources. Balancing reserve requirements are based on the 2.5th and 97.5th percentile of 1-min deviations from the HA schedule in a previous year. We then simulate RT deployment of balancing reserves using a separate minute-by-minute simulation of deviations from the HA schedules in the operating year. In the simulations we assume that balancing reserves can be fully deployed in 10 min. The minute-by-minute deviations account for HA forecasting errors and the actual variability of the load, wind, and solar generation. Using these minute-by-minute deviations and deployment of balancing reserves, we evaluate the impact of PV on system reliability through the calculation of the standard reliability metric called Control Performance Standard 2 (CPS2). Broadly speaking, the CPS2 score measures the percentage of 10-min periods in which a balancing area is able to balance supply and demand within a specific threshold. Compliance with the North American Electric Reliability Corporation (NERC) reliability standards requires that the CPS2 score must exceed 90% (i.e., the balancing area must maintain adequate balance for 90% of the 10-min periods). The combination of representing DA forecast errors in the

  19. Results Of Routine Strip Effluent Hold Tank And Decontaminated Salt Solution Hold Tank Samples From Modular Caustic-Side Solvent Extraction Unit During Macrobatch 5 Operations

    SciTech Connect (OSTI)

    Peters, T. B.; Fondeur, F. F.

    2013-04-30

    Strip Effluent Hold Tank (SEHT) and Decontaminated Salt Solution Hold Tank (DSSHT) samples from several of the ''microbatches'' of Integrated Salt Disposition Project (ISDP) Salt Batch (''Macrobatch'') 5 have been analyzed for {sup 238}Pu, {sup 90}Sr, {sup 137}Cs, and by Inductively Coupled Plasma Emission Spectroscopy (ICPES). The results indicate good decontamination performance within process design expectations. While the data set is sparse, the results of this set and the previous set of results for Macrobatch 4 samples indicate generally consistent operations. The DSSHT samples show continued presence of titanium, likely from leaching of the monosodium titanate in the Actinide Removal process (ARP).

  20. Three-Stage Production Cost Modeling Approach for Evaluating the Benefits of Intra-Hour Scheduling between Balancing Authorities

    SciTech Connect (OSTI)

    Samaan, Nader A.; Milligan, Michael; Hunsaker, Matthew; Guo, Tao

    2015-07-30

    This paper introduces a Production Cost Modeling (PCM) approach to evaluate the benefits of intra-hour scheduling between Balancing Authorities (BAs). The system operation is modeled in a three-stage sequential manner: day ahead (DA)-hour ahead (HA)-real time (RT). In addition to contingency reserve, each BA will need to carry out “up” and “down” load following and regulation reserve capacity requirements in the DA and HA time frames. In the real-time simulation, only contingency and regulation reserves are carried out as load following is deployed. To model current real-time operation with hourly schedules, a new constraint was introduced to force each BA net exchange schedule deviation from HA schedules to be within NERC ACE limits. Case studies that investigate the benefits of moving from hourly exchange schedules between WECC BAs into 10-min exchange schedules under two different levels of wind and solar penetration (11% and 33%) are presented.

  1. Department of Energy's Paducah Site Reaches Million-Hour Safety...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    KY - The U.S. Department of Energy's Paducah Site has reached a million hours of safe work toward completing cleanup objectives to reduce environmental risk. The LATA...

  2. Pay and Leave Administration and Hours of Duty

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30

    The order establishes policy, requirements and responsibilities for the management of pay, including overtime and compensatory time, leave administration, and hours of duty.

  3. CANMET hydrocracking unit onstream

    SciTech Connect (OSTI)

    Not Available

    1987-03-01

    In the early 1970's, Canadian engineers and scientists discovered that a low cost additive comprising coal impregnated with an iron compound, inhibited coke formation during a process that they named the CANMET Hydrocracking Process. The concept was developed to the pilot plant stage with over 50,000 hours of pilot plant operations. These operations proved that high conversion rates could be achieved by the CANMET Hydrocracking Process for a wide range of feedstocks that include not only bitumen, tar sands and heavy oils, but also refinery residua such as vacuum bottoms. The performance of a 5000 barrel per day demonstration plant is discussed.

  4. Liquid phase methanol LaPorte process development unit: Modification operation, and support studies. Task 3.6/3.7: Alternative catalyst/life run

    SciTech Connect (OSTI)

    Not Available

    1991-01-28

    In April 1987, Air Products started the third and final contract with the US Department of Energy to develop the Liquid Phase Methanol (LPMEOH) process. One of the objectives was to identify alternative commercial catalyst(s) for the process. This objective was strategically important as we want to demonstrate that the LPMEOH process is flexible and not catalyst selection limited. Among three commercially available catalysts evaluated in the lab, the catalyst with a designation of F21/0E75-43 was the most promising candidate. The initial judging criteria included not only the intrinsic catalyst activity but also the ability to be used effectively in a slurry reactor. The catalyst was then advanced for a 40-day life test in a laboratory 300 cc autoclave. The life test result also revealed superior stability when compared with that of a standard catalyst. Consequently, the new catalyst was recommended for demonstration in the Process Development Unit (PDU) at LaPorte, Texas. This report details the methodology of testing and selecting the catalyst.

  5. Understanding Cognitive and Collaborative Work: Observations in an Electric Transmission Operations Control Center

    SciTech Connect (OSTI)

    Obradovich, Jodi H.

    2011-09-30

    This paper describes research that is part of an ongoing project to design tools to assist in the integration of renewable energy into the electric grid. These tools will support control room dispatchers in real-time system operations of the electric power transmission system which serves much of the Western United States. Field observations comprise the first phase of this research in which 15 operators have been observed over various shifts and times of day for approximately 90 hours. Findings describing some of the cognitive and environmental challenges of managing the dynamically changing electric grid are presented.

  6. RESULTS OF ROUTINE STRIP EFFLUENT HOLD TANK AND DECONTAMINATED SALT SOLUTION HOLD TANK SAMPLES FROM MODULAR CAUSTIC-SIDE SOLVENT EXTRACTION UNIT DURING MACROBATCH 3 OPERATIONS

    SciTech Connect (OSTI)

    Peters, T.; Fink, S.

    2011-06-10

    Strip Effluent Hold Tank (SEHT) and Decontaminated Salt Solution Hold Tank (DSSHT) samples from several of the 'microbatches' of Integrated Salt Disposition Project (ISDP) Salt Batch ('Macrobatch') 3 have been analyzed for {sup 238}Pu, {sup 90}Sr, {sup 137}Cs, and by Inductively Coupled Plasma Emission Spectroscopy (ICPES). The results indicate good decontamination performance within process design expectations. While the data set is sparse, the results of this set and the previous set of results for Macrobatch 3 samples indicate consistent operations. However, the Decontamination Factors for plutonium and strontium removal have declined in Macrobatch 3, compared to Macrobatch 2. This may be due to the differences in the Pu concentration or the bulk chemical concentrations in the feed material. SRNL is considering the possible reasons for this decline. The DSSHT samples show continued presence of titanium, likely from leaching of the monosodium titanate in ARP. During operation of the ISDP, quantities of salt waste are processed through the Actinide Removal Process (ARP) and MCU in batches of {approx}3800 gallons. Monosodium titanate (MST) is used in ARP to adsorb actinides and strontium from the salt waste and the waste slurry is then filtered prior to sending the clarified salt solution to MCU. The MCU uses solvent extraction technology to extract cesium from salt waste and concentrate cesium in an acidic aqueous stream (Strip Effluent - SE), leaving a decontaminated caustic salt aqueous stream (Decontaminated Salt Solution - DSS). Sampling occurs in the Decontaminated Salt Solution Hold Tank (DSSHT) and Strip Effluent Hold Tank (SEHT) in the MCU process. The MCU sample plan requires that batches be sampled and analyzed for plutonium and strontium content by Savannah River National Lab (SRNL) to determine MST effectiveness. The cesium measurement is used to monitor cesium removal effectiveness and the inductively coupled plasma emission spectroscopy (ICPES) is used to monitor inorganic carryover.

  7. ESSENTIAL SKILLS (6-16 credit hours) Writing as Critical Thinking (3 credit hours)

    E-Print Network [OSTI]

    Gering, Jon C.

    databases and basic search techniques, Internet resources, and copy- right and privacy issues. Imbedded in Art History ITAL 225 Italian Film MUSI 204 Perspectives in Music: Art Music in Western Thought MUSI History I, 1607-1877 HIST 105 United States History II, 1877-Present HIST 131 World Civilizations before

  8. ESSENTIAL SKILLS (6-16 credit hours) Writing as Critical Thinking (3 credit hours)

    E-Print Network [OSTI]

    Gering, Jon C.

    databases and basic search techniques, Internet resources, and copyright and privacy issues. Imbedded The Art of Greece & Rome ART 332 Baroque Art ART 428 Topics in Art History ITAL 225 Italian Film MUSI 204 History I, 1607-1877 HIST 105 United States History II, 1877-Present HIST 131 World Civilizations before

  9. Course Information SER 234 Operating Systems and Networking

    E-Print Network [OSTI]

    · · · · · · · · · · · Course Information SER 234 Operating Systems and Networking Catalog Description Fundamentals of operating systems, process management, scheduling, and file management. Network technology, topologies, protocols, application control; network and operating system security. Credit Hours

  10. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in...

  11. Lot Times & After Hour Parking Policy Definition & Purpose

    E-Print Network [OSTI]

    Emshwiller, Eve

    Lot Times & After Hour Parking Policy Definition & Purpose This policy establishes standard Lot times, (2) establish consistent lot times, and (3) provide balance for after hours parking needs (public Police, and will annually review placement of lots in categories. · Parking is restricted to marked

  12. Forecasting Hourly Electricity Load Profile Using Neural Networks

    E-Print Network [OSTI]

    Koprinska, Irena

    Forecasting Hourly Electricity Load Profile Using Neural Networks Mashud Rana and Irena Koprinska--We present INN, a new approach for predicting the hourly electricity load profile for the next day from a time series of previous electricity loads. It uses an iterative methodology to make the predictions

  13. Superfund Record of Decision (EPA Region 3): Rhinehart Tire Fire Dump, Operable Unit 2, Winchester, VA. (Second remedial action), September 1992

    SciTech Connect (OSTI)

    Not Available

    1992-09-29

    The Rhinehart Tire Fire Dump site is located in a 22-acre drainage area of a sparsely populated rural area in western Frederick County, Virginia. Surface water runoff flows into a north-south tributary that discharges to Hogue Creek, which is 4,000 feet downstream. Bedrock is noted to be highly fractured, and the ground water flow in the overburden aquifer is toward Massey Run. From 1972 to 1983, the site owner conducted a tire disposal operation, which consisted of transporting discarded tires from various locations and storing them on a 5-acre wooded slope behind his home. An estimated 5 to 7 million tires that had been accumulated caught on fire in October 1983 and burned until July 1984. As a result of the fire, a free-flowing oily-tar, which contained anthracene, benzene, cadmium, chromium, ethylbenzene, napthalene, nickel, pyrene, toluene, and zinc, began to seep out of the tire pile into Massey Run and on to Hogue Creek.

  14. Six- and three-hourly meteorological observations from 223 USSR stations

    SciTech Connect (OSTI)

    Razuvaev, V.N.; Apasova, E.B.; Martuganov, R.A.; Kaiser, D.P.

    1995-04-01

    This document describes a database containing 6- and 3-hourly meteorological observations from a 223-station network of the former Soviet Union. These data have been made available through cooperation between the two principal climate data centers of the United States and Russia: the National Climatic Data Center (NCDC), in Asheville, North Carolina, and the All-Russian Research Institute of Hydrometeorological Information -- World Data Centre (RIHMI-WDC) in Obninsk. Station records consist of 6- and 3-hourly observations of some 24 meteorological variables including temperature, weather type, precipitation amount, cloud amount and type, sea level pressure, relative humidity, and wind direction and speed. The 6-hourly observations extend from 1936 to 1965; the 3-hourly observations extend from 1966 through the mid-1980s (1983, 1984, 1985, or 1986; depending on the station). These data have undergone extensive quality assurance checks by RIHMI-WDC, NCDC, and the Carbon Dioxide Information Analysis Center (CDIAC). The database represents a wealth of meteorological information for a large and climatologically important portion of the earth`s land area, and should prove extremely useful for a wide variety of regional climate change studies. These data are available free of charge as a numeric data package (NDP) from CDIAC. The NDP consists of this document and 40 data files that are available via the Internet or on 8mm tape. The total size of the database is {approximately}2.6 gigabytes.

  15. The Dell operating model

    E-Print Network [OSTI]

    Paxton, Blaine Kermit

    2004-01-01

    Dell, Inc. is well known for its dramatic and continually improving operational performance in terms of unit cost, inventory level, production capacity, and labor efficiency. However, in late 2002, several members of Dell's ...

  16. The primary circuit materials properties results analysis performed on archive material used in NPP V-1 and Kola NPP Units 1 and 2

    SciTech Connect (OSTI)

    Kupca, L.; Beno, P. [Nuclear Power Plants Research Institute Inc., Trnava (Slovakia)

    1997-04-01

    A very brief summary is provided of a primary circuit piping material properties analysis. The analysis was performed for the Bohunice V-1 reactor and the Kola-1 and -2 reactors. Assessment was performed on Bohunice V-1 archive materials and primary piping material cut from the Kola units after 100,000 hours of operation. Main research program tasks included analysis of mechanical properties, corrosion stability, and microstructural properties. Analysis results are not provided.

  17. Remedial investigation work plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Study (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.

  18. Systematic Method for Evaluating Extraction and Injection Flow Rates for 100-KR-4 and 100-HR-3 Groundwater Operable Unit Pump-and-Treat Interim Actions for Hydraulic Containment

    SciTech Connect (OSTI)

    Spiliotopoulos, Alexandros A.

    2013-03-20

    This document describes a systematic method to develop flow rate recommendations for Pump-and-Treat (P&T) extraction and injection wells in 100-KR-4 and 100-HR-3 Groundwater Operable Units (OU) of the Hanford Site. Flow rate recommendations are developed as part of ongoing performance monitoring and remedy optimization of the P&T interim actions to develop hydraulic contairnnent of the dissolved chromium plume in groundwater and protect the Columbia River from further discharges of groundwater from inland. This document details the methodology and data required to infer the influence of individual wells near the shoreline on hydraulic containment and river protection and develop flow rate recommendations to improve system performance and mitigate potential shortcomings of the system configuration in place.

  19. MAJOR: Consumer and Community Studies (CCS) Minimum CCS Major Hours: 35 (at least 18 semester hours for the CCS major

    E-Print Network [OSTI]

    Capecchi, Mario R.

    4 FCS 3210 Statistics (QB/QI) 4 2. CCS CORE (6 Credit Hours) FCS 3450 Family Economic Issues (QI: An Evidence-based Approach (QI) Pre-req: FCS 3200 FCS 5730 Community & Environmental Change FCS 4910 CSBS of Politics, located in OSH 253, 801-581-8501 4. CCS ELECTIVES (15 Credit Hours ­ See list to the right): Some

  20. General Education and Major Coursework: Credit Hours General Education and Major Coursework: Credit Hours ENGN 110 2 ECE 111 2

    E-Print Network [OSTI]

    : 128 ** Meets philosophy and ethics general education requirement. Electrical engineering majors mustGeneral Education and Major Coursework: Credit Hours General Education and Major Coursework: Credit (C or better required) 3 PHYS 231N 4 COMM 101R 3 General Education and Major Coursework: Credit Hours

  1. Addendum to the Closure Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Discharge Area, Nevada Test Site, Revision 0

    SciTech Connect (OSTI)

    Grant Evenson

    2009-05-01

    This document constitutes an addendum to the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Discharge Area Nevada Test Site, December 1997 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-19-01, A12 Fleet Ops Steam Cleaning Efflu. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.

  2. Remedial investigation/feasibility study of the Clinch River/Poplar Creek Operable Unit. Volume 2. Appendixes A, B, C, and D-Biota and representative concentrations of contaminants

    SciTech Connect (OSTI)

    NONE

    1996-06-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is Volume 2 of the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

  3. DOE ZERH Virtual Office Hours (1 of 4)

    Broader source: Energy.gov [DOE]

    TitleZERH Virtual Office Hours: Get the Answers You Need Quickly & EfficientlyDescriptionWhether you’re new to DOE Zero Energy Ready Home or have been involved for a few years, our partners...

  4. DOE ZERH Virtual Office Hours (4 of 4)

    Broader source: Energy.gov [DOE]

    TitleZERH Virtual Office Hours: Get the Answers You Need Quickly & EfficientlyDescriptionWhether you’re new to DOE Zero Energy Ready Home or have been involved for a few years, our partners...

  5. DOE ZERH Virtual Office Hours (3 of 4)

    Broader source: Energy.gov [DOE]

    TitleZERH Virtual Office Hours: Get the Answers You Need Quickly & EfficientlyDescriptionWhether you’re new to DOE Zero Energy Ready Home or have been involved for a few years, our partners...

  6. DOE ZERH Virtual Office Hours (2 of 4)

    Broader source: Energy.gov [DOE]

    TitleZERH Virtual Office Hours: Get the Answers You Need Quickly & EfficientlyDescriptionWhether you’re new to DOE Zero Energy Ready Home or have been involved for a few years, our partners...

  7. Balancing Authority Cooperation Concepts - Intra-Hour Scheduling

    SciTech Connect (OSTI)

    Hunsaker, Matthew; Samaan, Nader; Milligan, Michael; Guo, Tao; Liu, Guangjuan; Toolson, Jacob

    2013-03-29

    The overall objective of this study was to understand, on an Interconnection-wide basis, the effects intra-hour scheduling compared to hourly scheduling. Moreover, the study sought to understand how the benefits of intra-hour scheduling would change by altering the input assumptions in different scenarios. This report describes results of three separate scenarios with differing key assumptions and comparing the production costs between hourly scheduling and 10-minute scheduling performance. The different scenarios were chosen to provide insight into how the estimated benefits might change by altering input assumptions. Several key assumptions were different in the three scenarios, however most assumptions were similar and/or unchanged among the scenarios.

  8. Pay and Leave Administration and Hours of Duty

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-01-14

    This Order establishes requirements and responsibilities for the management of pay, including overtime and compensatory time, leave administration, and hours of duty. Cancels DOE O 322.1A. Canceled by DOE O 322.1C.

  9. Airport quotas and peak hour pricing : theory and practice

    E-Print Network [OSTI]

    Odoni, Amedeo R.

    1976-01-01

    This report examines the leading theoretical studies not only of airport peak-hour pricing but also of the congestion costs associated with airport delays and presents a consistent formulation of both. The report also ...

  10. CIVIL ENGINEERING 2015-2016 UCF Catalog (128 Hour Program)

    E-Print Network [OSTI]

    Hua, Kien A.

    CIVIL ENGINEERING 2015-2016 UCF Catalog (128 Hour Program) Department of Civil, Environmental) Third Year Spring (17) CWR 3201 - Engr Fluid Mechanics (3) CWR 4632C ­ Water Resources Engr I (4) CES

  11. CONSTRUCTION ENGINEERING 2015-2016 Catalog (128 Hour Program)

    E-Print Network [OSTI]

    Hua, Kien A.

    CONSTRUCTION ENGINEERING 2015-2016 Catalog (128 Hour Program) Department of Civil, Environmental - Geotechnical Engr I (4) ACG 2071 Managerial Accounting (3) CWR 4632C ­ Water Resources I (4) *Cultural

  12. Pay and Leave Administration and Hours of Duty

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-01-19

    The order establishes requirements and responsibilities for the management of pay, including overtime pay and compensatory time, leave administration, time and attendance reporting, and hours of duty. Cancels DOE O 322.1B and DOE O 535.1

  13. Summer 2015 BIOENGINEERING ADVISING HOURS Dr. Liping Tang

    E-Print Network [OSTI]

    Huang, Haiying

    Summer 2015 BIOENGINEERING ADVISING HOURS Dr. Liping Tang Track Advisor for Dual Degree.m. 817/272-1754 sarah.watson@uta.edu ALL BIOENGINEERING OFFICES ARE LOCATED IN THE ENGINEERING RESEARCH

  14. DDeeppaarrttmmeenntt ooff EExxeerrcciissee SScciieenncceess CC AAddvviisseemmeenntt RReessppoonnssiibbiilliittiieess Office Hours

    E-Print Network [OSTI]

    Martinez, Tony R.

    801-422-3042 E-mail: lifesciences@byu.edu Text: SMS 4-122-LIF-SC Office Hours MBF 8:00 aB5:00 p Internship Website Office Hours MBF 8:00 aB5:00 p INTERNSHIP COORDINATOR IRAMS issues (online application-422-6535 lisa_christenson@byu.edu University Advisor for CLS Resumes, Letter Writing, Job Search Skills

  15. NV Energy Large-Scale Photovoltaic Integration Study: Intra-Hour Dispatch and AGC Simulation

    SciTech Connect (OSTI)

    Lu, Shuai; Etingov, Pavel V.; Meng, Da; Guo, Xinxin; Jin, Chunlian; Samaan, Nader A.

    2013-01-02

    The uncertainty and variability with photovoltaic (PV) generation make it very challenging to balance power system generation and load, especially under high penetration cases. Higher reserve requirements and more cycling of conventional generators are generally anticipated for large-scale PV integration. However, whether the existing generation fleet is flexible enough to handle the variations and how well the system can maintain its control performance are difficult to predict. The goal of this project is to develop a software program that can perform intra-hour dispatch and automatic generation control (AGC) simulation, by which the balancing operations of a system can be simulated to answer the questions posed above. The simulator, named Electric System Intra-Hour Operation Simulator (ESIOS), uses the NV Energy southern system as a study case, and models the system’s generator configurations, AGC functions, and operator actions to balance system generation and load. Actual dispatch of AGC generators and control performance under various PV penetration levels can be predicted by running ESIOS. With data about the load, generation, and generator characteristics, ESIOS can perform similar simulations and assess variable generation integration impacts for other systems as well. This report describes the design of the simulator and presents the study results showing the PV impacts on NV Energy real-time operations.

  16. Voltage verification unit

    DOE Patents [OSTI]

    Martin, Edward J. (Virginia Beach, VA)

    2008-01-15

    A voltage verification unit and method for determining the absence of potentially dangerous potentials within a power supply enclosure without Mode 2 work is disclosed. With this device and method, a qualified worker, following a relatively simple protocol that involves a function test (hot, cold, hot) of the voltage verification unit before Lock Out/Tag Out and, and once the Lock Out/Tag Out is completed, testing or "trying" by simply reading a display on the voltage verification unit can be accomplished without exposure of the operator to the interior of the voltage supply enclosure. According to a preferred embodiment, the voltage verification unit includes test leads to allow diagnostics with other meters, without the necessity of accessing potentially dangerous bus bars or the like.

  17. Comparison of building energy use data between the United States and China

    E-Print Network [OSTI]

    Xia Ph.D., Jianjun

    2014-01-01

    building operations, Energy and Buildings 33 (2001) [22]and large public building energy consumption statisticalsystems iSagy iSagy EPP Pulse Energy 1 hour 1 hour 15 min 15

  18. Improving Unit Operations-Test Station Performance 

    E-Print Network [OSTI]

    Filak, J. J. Jr.

    1995-01-01

    This program's basic concept deals with the possibilities for reducing energy efficiency through four key elements. These elements are pounds per square inch (psi), gallons per minutes (gpm), revolutions per minutes (rpm) ...

  19. Effective Energy Conservation in the Operating Unit 

    E-Print Network [OSTI]

    Korich, R. D.

    1982-01-01

    The quickly escalating cost of energy has outpaced all other plant costs and has placed energy conservation squarely as the critical leverage for improving profitability. The transition of priority created a need at the Union Carbide Seadrift, Texas...

  20. 100-OL-1 Operable Unit Pilot Study

    E-Print Network [OSTI]

    Site at the beginning of the Manhattan Project. Today, the residues from historical application of lead prior to the Manhattan Project. The pre-Hanford orchard lands identified as the 100-OL-1 OU are located

  1. Bathroom lights generally operate between five to eight hours per occupied

    E-Print Network [OSTI]

    -specific luminaire that integrates a low-wattage light-emitting diode (LED) nightlight and an occupancy sensor

  2. SCHOOL OF MATHEMATICS AND STATISTICS Spring Semester 20102011 OPERATIONS RESEARCH 2 hours

    E-Print Network [OSTI]

    four will be counted. 1 (i) A company owns a steam turbine power generating plant that generates its steam from coal. It wishes to maximise the steam output. This, however, may result in emission that does receives two grades of pulverised coal, C1 and C2, for use in the steam plant. The two grades are usually

  3. SCHOOL OF MATHEMATICS AND STATISTICS Spring Semester 20102011 ADVANCED OPERATIONS RESEARCH 2 hours

    E-Print Network [OSTI]

    , only your best four will be counted. 1 (i) A company owns a steam turbine power generating plant that generates its steam from coal. It wishes to maximise the steam output. This, however, may result in emission. The plant receives two grades of pulverised coal, C1 and C2, for use in the steam plant. The two grades

  4. EIA-930 Hourly and Daily Balancing Authority Operations Reports - Instructions Page

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming Dry Natural GasNatural GasEIA lowers forecast

  5. Inventory of Nonutility Electric Power Plants in the United States

    Reports and Publications (EIA)

    2003-01-01

    Final issue of this report. Provides annual aggregate statistics on generating units operated by nonutilities in the United States and the District of Columbia. Provides a 5-year outlook for generating unit additions and changes.

  6. 20K Hour GATEWAY Testing Results for I-35W Bridge Webinar

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy released a GATEWAY Demonstration report on the longer-term performance of an LED lighting system that was installed on the I-35W Bridge in Minneapolis in September 2008 and represents one of the country’s oldest continuously operated exterior LED lighting installations. Prior to installation, two of the LED luminaires were tested, along with a third luminaire that was not installed on the bridge but was tested for 6,000 hours in a laboratory for comparison purposes.

  7. 0033 Lifeguard, Parking, Ski Patrol WU.... Workstudy Undergraduate (Hourly) Lifeguard

    E-Print Network [OSTI]

    Operations Dishwasher Accounting Assistant Food Preparation or Serving Auditor Concessions or Catering Worker

  8. A genetic algorithm for solving the unit commitment problem of a hydro-thermal power system

    SciTech Connect (OSTI)

    Rudolf, A.; Bayrleithner, R.

    1999-11-01

    The paper presents a two layer approach to solve the unit commitment problem of a hydro-thermal power system. The first layer uses a genetic algorithm (GA) to decide the on/off status of the units. The second layer uses a non-linear programming formulation solved by a Lagrangian relaxation to perform the economic dispatch while meeting all plant and system constraints. In order to deal effectively with the constraints of the problem and prune the search space of the GA in advance, the difficult minimum up/down-time constraints of thermal generation units and the turbine/pump operating constraint of storage power stations are embedded in the binary strings that are coded to represent the on/off-states of the generating units. The other constraints are handled by integrating penalty costs into the fitness function. In order to save execution time, the economic dispatch is only performed if the given unit commitment schedule is able to meet the load balance, energy, and begin/end level constraints. The proposed solution approach was tested on a real scaled hydro-thermal power system over a period of a day in half-hour time-steps for different GA-parameters. The simulation results reveal that the features of easy implementation, convergence within an acceptable execution time, and highly optimal solution in solving the unit commitment problem can be achieved.

  9. ARCHITECTURE The tour will take an hour to walk.

    E-Print Network [OSTI]

    Boucherie, Richard J.

    ARCHITECTURE & ART The tour will take an hour to walk. Refreshments during your tour are available 12 1518 20 27 28 31 34 architecture & art a walking tour of the campus colophon Extra info1 Het. Timmerman, , 2011. See also: www.groteA.nl The Art & Architecture Route is a publication of December 2013

  10. BIODEGRADATION AND BIOREMEDIATION 3 credit hour (Web based only)

    E-Print Network [OSTI]

    Ma, Lena

    of bioremediation of contaminated soils and water. INSTRUCTORS: Dr. Kanika Sharma Inglett, Department of SoilSWS 6366 BIODEGRADATION AND BIOREMEDIATION 3 credit hour (Web based only) COURSE DESCRIPTION and Water Science PO Box 110290 University of Florida, Gainesville, FL 32611-0510 E-mail: kanika

  11. ECE 3301: General Electrical Engineering Credit / Contact hours: 3 / 3

    E-Print Network [OSTI]

    Gelfond, Michael

    ECE 3301: General Electrical Engineering Credit / Contact hours: 3 / 3 Course coordinator: Mary Baker Textbook(s) and/or other required material: Hambley, Allan R., Electrical Engineering ­ Principles and Applications, fourth edition, Prentice Hall, 2007. Catalog description: Analysis of electric circuits

  12. ENVIRONMENTAL ENGINEERING 2015-2016 UCF Catalog (128 Hour Program)

    E-Print Network [OSTI]

    Hua, Kien A.

    ENVIRONMENTAL ENGINEERING 2015-2016 UCF Catalog (128 Hour Program) Department of Civil 3331 ­ Mechanics of Materials (3) ENV 4561 ­ Env Engr Ops & Proc 2 (3) CWR 4632C ­ Water Resources 1 (4 Design (3) CWR 4633C ­ Water Resources 2 (3) Technical Elective (3) CCE 4003 ­ Intro to Construction Ind

  13. 15 hours of Accounting Must take two of

    E-Print Network [OSTI]

    Huang, Haiying

    15 hours of Accounting completed Must take two of these three options in Senior year. Attention. Prerequisites: Are courses or requirements that must be completed before enrollment in a course. BS - Accounting Business Statistics I Acct 3303 Accounting Systems Acct 3311 Financial Accounting I Acct 3312 Financial

  14. Pay and Leave Administration and Hours of Duty

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-01-19

    The order establishes requirements and responsibilities for the management of pay, including overtime pay and compensatory time, leave administration, time and attendance reporting, and hours of duty. Admin Chg 1, dated 5-10-12, supersedes DOE O 322.1C.

  15. Renewable Energies program (6 credit hour) Option A: 11

    E-Print Network [OSTI]

    Simaan, Nabil

    Renewable Energies program (6 credit hour) Option A: 11 Option B: The program is organized by t Spanish Institute and the Asso program on renewable energy will provide students with advanced knowledge. opportunities: option A- two renewable energies; option B include on-site visits to renewable energy generation

  16. Remedial Investigation Report on Chestnut Ridge Operable Unit 2 (Filled Coal Ash Pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1. Main Text

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This document is a report on the remedial investigation (RI) of Chestnut Ridge Operable Unit (OU) 2 at the Oak Ridge Y-12 Plant. Chestnut Ridge OU 2 consists of Upper McCoy Branch (UMB), the Filled Coal Ash Pond (FCAP), and the area surrounding the Sluice Channel formerly associated with coal ash disposal in the FCAP. Chestnut Ridge OU 2 is located within the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation in Anderson County, Tennessee, approximately 24 miles west of Knoxville. The pond is an 8.5-acre area on the southern slope of Chestnut Ridge, 0.5 mile south of the main Y-12 Plant and geographically separated from the Y-12 Plant by Chestnut Ridge. The elevation of the FCAP is {approximately} 950 ft above mean sea level (msl), and it is relatively flat and largely vegetated. Two small ponds are usually present at the northeast and northwest comers of the FCAP. The Sluice Channel Area extends {approximately}1000 ft from the northern margin of the FCAP to the crest of Chestnut Ridge, which has an elevation of {approximately}1100 ft above msl. The Sluice Channel Area is largely vegetated also. McCoy Branch runs from the top of Chestnut Ridge across the FCAP into Rogers Quarry and out of the quarry where it runs a short distance into Milton Hill Lake at McCoy Embayment, termed UMB. The portion south of Rogers Quarry, within Chestnut Ridge OU 4, is termed Lower McCoy Branch. The DOE Oak Ridge Y-12 Plant disposed of coal ash from its steam plant operations as a slurry that was discharged into an ash retention impoundment; this impoundment is the FCAP. The FCAP was built in 1955 to serve as a settling basin after coal ash slurried over Chestnut Ridge from the Y-12 Plant. The FCAP was constructed by building an earthen dam across the northern tributary of McCoy Branch. The dam was designed to hold 20 years of Y-12 steam plant ash. By July 1967, ash had filled up the impoundment storage behind the dam to within 4 ft of the top.

  17. Is the hourly data I get from NREL's PV Watts program adjusted...

    Open Energy Info (EERE)

    with daylight savings as it doesn't refer in any way to "hour 1, hour 2...." as the NREL generated production numbers do. Should i adjust the production numbers by an hour on...

  18. France's 35 Hour Work Week and the Political Economy of Andre Gorz

    E-Print Network [OSTI]

    Storer, Adam

    2011-01-01

    1] Bilous, Alexandre. “35-Hour Working Week Law Adopted. ”4] Nicot, Anne-Marie. “35-Hour Week No Longer Standard ofFrance’s 35 Hour Work Week and the Political Economy of

  19. A Review of Unit Commitment Brittany Wright

    E-Print Network [OSTI]

    Lavaei, Javad

    1 A Review of Unit Commitment ELENE4511 Brittany Wright May 28, 2013 #12;2 Table of Contents 1 ..............................................................................................................................................3 2. Unit Commitment is known as unit commitment. It is a large-scale optimization problem that determines the operating status

  20. H-coal pilot plant. Phase II. Construction. Phase III. Operation. Annual report No. 3

    SciTech Connect (OSTI)

    Not Available

    1981-02-04

    At the request of DOE Oak Ridge, ASFI agreed to assume responsibility for completion of Plant construction in December, 1979, at which time Badger Plants' on-site work was ended. This construction effort consisted of electric heat tracing and insulation of piping and instrumentation. At the close of the reporting period the work was completed, or was projected to be completed, within the ASFI budgeted amounts and by dates that will not impact Plant operations. Engineering design solutions were completed for problems encountered with such equipment as the High Pressure Letdown Valves; Slurry Block Valves; Slurry Pumps; the Bowl Mill System; the Dowtherm System; and the Ebullating Pump. A Corrosion Monitoring Program was established. With the exception of Area 500, the Antisolvent Deashing Unit, all operating units were commissioned and operated during the reporting period. Coal was first introduced into the Plant on May 29, 1980, with coal operations continuing periodically through September 30, 1980. The longest continuous coal run was 119 hours. A total of 677 tons of Kentucky No. 11 Coal were processed during the reporting period. The problems encountered were mechanical, not process, in nature. Various Environmental and Health programs were implemented to assure worker safety and protection and to obtain data from Plant operations for scientific analysis. These comprehensive programs will contribute greatly in determining the acceptability of long term H-Coal Plant operations.

  1. NUCLEAR PLANT OPERATIONS AND

    E-Print Network [OSTI]

    Demazière, Christophe

    NUCLEAR PLANT OPERATIONS AND CONTROL KEYWORDS: moderator temper ature coefficient, reactivity co reactor Unit 4 of the Ringhals Nuclear Power Plant (Sweden) during fuel cycle 16 is analyzed of Reactor Physics SE-41296 Gothenburg, Sweden GABOR PÓR Budapest University of Technology and Economics H

  2. NUCLEAR PLANT OPERATIONS AND

    E-Print Network [OSTI]

    Pázsit, Imre

    NUCLEAR PLANT OPERATIONS AND CONTROL KEYWORDS: moderator temper- ature coefficient, reactivity co reactor Unit 4 of the Ringhals Nuclear Power Plant (Sweden) during fuel cycle 16 is analyzed of Reactor Physics SE-41296 Gothenburg, Sweden GABOR PÓR Budapest University of Technology and Economics H

  3. Businss Operations Calendar: YY 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Workdays (S BU) Salaried Bargaining Unit WD 253 250 Holidays (Salaried + BU) All cutoff Business Operations Calendar Y12 - FY 2015 (58 Shift) S January 15 M T W T F S...

  4. Unit and student details Unit code Unit title

    E-Print Network [OSTI]

    Sekercioglu, Y. Ahmet

    Unit and student details Unit code Unit title If this is a group assignment, each student must submitted Has any part of this assessment been previously submitted as part of another unit/course? Yes not be copied. No part of this assignment has been previously submitted as part of another unit/course. I

  5. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report January 1 - March 31, 2005

    SciTech Connect (OSTI)

    DL Sisterson

    2005-03-31

    Description. Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year dating back to 1998. The United States Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 – (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for this second quarter for the Southern Great Plains (SGP) site is 2052 hours (0.95 × 2,160 hours this quarter). The annual OPSMAX for the North Slope Alaska (NSA) site is 1944 hours (0.90 × 2,160), and that for the Tropical Western Pacific (TWP) site is 1836 hours (0.85 × 2,160). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the ACRF Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of data in the Archive represents the average percent of the time (24 hours per day, 90 days for this quarter) the instruments were operating this quarter.

  6. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report April 1 - June 30, 2005

    SciTech Connect (OSTI)

    DL Sisterson

    2005-06-30

    Description. Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year dating back to 1998. The United States Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 – (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter for the Southern Great Plains (SGP) site is 2,074.8 hours (0.95 × 2,184 hours this quarter). The annual OPSMAX for the North Slope Alaska (NSA) site is 1,965.6 hours (0.90 × 2,184), and that for the Tropical Western Pacific (TWP) site is 1,856.4 hours (0.85 × 2,184). The OPSMAX time for the ARM Mobile Facility (AMF) is 2,074.8 (0.95 × 2,184). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the ACRF Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of data in the Archive represents the average percent of the time (24 hours per day, 91 days for this quarter) the instruments were operating this quarter

  7. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report October 1 - December 31, 2004

    SciTech Connect (OSTI)

    DL Sisterson

    2004-12-31

    Description. Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year dating back to 1998. The United States Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 – (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The annual OPSMAX time for the Southern Great Plains (SGP) site is 8,322 hours per year (0.95 × 8,760, the number hours in a year, not including leap year). The annual OPSMAX for the North Slope Alaska (NSA) site is 7,884 hours per year (0.90 × 8,760), and that for the Tropical Western Pacific (TWP) site is 7,446 hours per year (0.85 × 8,760). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the ACRF Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of data in the Archive represents the average percent of the time (24 hours per day, 365 days per year) the instruments were operating.

  8. Shunting of Passenger Train Units: an Integrated Approach

    E-Print Network [OSTI]

    Schrijver, Alexander

    , Department of Logistics, the Netherlands Corresponding author, email: rlentink@fbk.eur.nl Abstract or it is in maintenance. However, outside the rush hours, an operator usually has a surplus of rolling stock. The idle

  9. An Improved Procedure for Developing Calibrated Hourly Simulation Models 

    E-Print Network [OSTI]

    Bou-Saada, T. E.; Haberl, J. S.

    1995-01-01

    . REFERENCES Abbas, M. 1993. Development of graphical indices for building energy data, M.S. Thesis, Energy Systems Rpt No. ESL-TH-93/12-02, Texas A&M University, College Station, TX. ASHRAE. 1991. ASHRAE handbook: 1991 HVAC applications volume. American... Support Office, University of Illinois Urbana-Champaign. Bou-Saada, T.E. 1994a. An improved procedure for developing a calibrated hourly simulation model of an electrically heated and cooled commercial building, M.S. Thesis, Energy Systems Rpt No. ESL- TH...

  10. 2015 Hour of Code Video | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-InspiredAtmosphericdevicesPPONeApril 30, 2013Program952015 Hour of Code Video

  11. Gate Hours & Services | Stanford Synchrotron Radiation Lightsource

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation Current HABFESOpportunities Nuclearlong version)shortGate Hours & Services

  12. Hospital Triage in First Hours After Nuclear or Radiological Disaster

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation CurrentHenry Bellamy, Ph.D.Food Drive HolidayHours Used HopperAResearches

  13. Unit Unit Desc Unit Unit Desc Program Program Desc OLD ACCOUNT FORMAT NEW ACCOUNT FORMAT

    E-Print Network [OSTI]

    Unit Unit Desc Unit Unit Desc Program Program Desc OLD ACCOUNT FORMAT NEW ACCOUNT FORMAT 001113 AP Old O/S A/P NonResCk 0000 General 000000 General #12;Unit Unit Desc Unit Unit Desc Program Program

  14. Store-operate-coherence-on-value

    DOE Patents [OSTI]

    Chen, Dong; Heidelberger, Philip; Kumar, Sameer; Ohmacht, Martin; Steinmacher-Burow, Burkhard

    2014-11-18

    A system, method and computer program product for performing various store-operate instructions in a parallel computing environment that includes a plurality of processors and at least one cache memory device. A queue in the system receives, from a processor, a store-operate instruction that specifies under which condition a cache coherence operation is to be invoked. A hardware unit in the system runs the received store-operate instruction. The hardware unit evaluates whether a result of the running the received store-operate instruction satisfies the condition. The hardware unit invokes a cache coherence operation on a cache memory address associated with the received store-operate instruction if the result satisfies the condition. Otherwise, the hardware unit does not invoke the cache coherence operation on the cache memory device.

  15. Operating Reserve Reductions from a Proposed Energy Imbalance Market with Wind and Solar Generation in the Western Interconnection

    SciTech Connect (OSTI)

    King, J.; Kirby, B.; Milligan, M.; Beuning, S.

    2012-05-01

    This paper considers several alternative forms of an energy imbalance market (EIM) proposed in the nonmarket areas of the Western Interconnection. The proposed EIM includes two changes in operating practices that independently reduce variability and increase access to responsive resources: balancing authority cooperation and sub-hourly dispatch. As the penetration of variable generation increases on the power system, additional interest in coordination would likely occur. Several alternative approaches could be used, but consideration of any form of coordinated unit commitment is beyond the scope of this analysis. This report examines the benefits of several possible EIM implementations--both separately and in concert.

  16. Analysis of clear hour solar irradiation for seven Canadian stations

    SciTech Connect (OSTI)

    Garrison, J.; Sahami, K.

    1995-12-31

    Hourly global and diffuse irradiation and corresponding surface meteorological data have been analyzed for the seven Canadian stations at Edmonton, Goose Bay, Montreal, Port Hardy, Resolute, Toronto, and Winnipeg. The variation of the most probable clear hour values of clearness index k{sub t}, diffuse index k{sub d}, direct beam index k{sub b}, and Angstrom turbidity coefficient {beta} with solar elevation, atmospheric precipitable water, and snow depth are obtained. Values of these quantities are presented which are consistent with the attenuation and scattering of solar radiation by the atmosphere which is expected. The most probable values of {beta} tend to be lower than the average values of {beta} recently reported by Gueymard. The data indicate a drift in the calibration of the instruments used for measurements of the irradiation data for the stations at Goose Bay and Resolute. The data for the other five stations indicate that the instrument calibration is maintained over the years of the data. 4 refs., 8 figs., 5 tabs.

  17. Contamination analysis unit

    DOE Patents [OSTI]

    Gregg, H.R.; Meltzer, M.P.

    1996-05-28

    The portable Contamination Analysis Unit (CAU) measures trace quantities of surface contamination in real time. The detector head of the portable contamination analysis unit has an opening with an O-ring seal, one or more vacuum valves and a small mass spectrometer. With the valve closed, the mass spectrometer is evacuated with one or more pumps. The O-ring seal is placed against a surface to be tested and the vacuum valve is opened. Data is collected from the mass spectrometer and a portable computer provides contamination analysis. The CAU can be used to decontaminate and decommission hazardous and radioactive surfaces by measuring residual hazardous surface contamination, such as tritium and trace organics. It provides surface contamination data for research and development applications as well as real-time process control feedback for industrial cleaning operations and can be used to determine the readiness of a surface to accept bonding or coatings. 1 fig.

  18. Contamination analysis unit

    DOE Patents [OSTI]

    Gregg, Hugh R. (Livermore, CA); Meltzer, Michael P. (Livermore, CA)

    1996-01-01

    The portable Contamination Analysis Unit (CAU) measures trace quantifies of surface contamination in real time. The detector head of the portable contamination analysis unit has an opening with an O-ring seal, one or more vacuum valves and a small mass spectrometer. With the valve closed, the mass spectrometer is evacuated with one or more pumps. The O-ring seal is placed against a surface to be tested and the vacuum valve is opened. Data is collected from the mass spectrometer and a portable computer provides contamination analysis. The CAU can be used to decontaminate and decommission hazardous and radioactive surface by measuring residual hazardous surface contamination, such as tritium and trace organics It provides surface contamination data for research and development applications as well as real-time process control feedback for industrial cleaning operations and can be used to determine the readiness of a surface to accept bonding or coatings.

  19. UNITED STEELWORKERS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking With WIPP UPDATE:Administrationfollowing tableUNITED FERC

  20. United States

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann Jackson About1996HowFOAShowing YouNeedof EnergyMeeting - MarchUSPS:1 United States

  1. United States

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann Jackson About1996HowFOAShowing YouNeedof EnergyMeeting - MarchUSPS:1 United States7

  2. United States

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann Jackson About1996HowFOAShowing YouNeedof EnergyMeeting - MarchUSPS:1 United States78

  3. United States

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann Jackson About1996HowFOAShowing YouNeedof EnergyMeeting - MarchUSPS:1 United

  4. United States

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann Jackson About1996HowFOAShowing YouNeedof EnergyMeeting - MarchUSPS:1 UnitedDuke-4-E

  5. Report for Batch Leach Analyses on Sediments at 100-HR-3 Operable Unit, Boreholes C7620, C7621, C7622, C7623, C7626, C7627, C7628, C7629, C7630, and C7866. Revision 1.

    SciTech Connect (OSTI)

    Lindberg, Michael J.

    2012-04-25

    This is a revision to a previously released report. This revision contains additional analytical results for the sample with HEIS number B2H4X7. Between November 4, 2010 and October 26, 2011 sediment samples were received from 100-HR-3 Operable Unit for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL. Samples were received with a chain of custody (COC) and were analyzed according to the sample identification numbers supplied by the client. All Samples were refrigerated upon receipt until prepared for analysis. All samples were received with custody seals intact unless noted in the Case Narrative. Holding time is defined as the time from sample preparation to the time of analyses. The prescribed holding times were met for all analytes unless noted in the Case Narrative. All reported analytical results meet the requirements of the CAW or client specified SOW unless noted in the case narrative. Due to the requirements of the statement of work and sampling events in the field, the 28 day and the 48 hr requirements cannot be met. The statement of work requires samples to be selected at the completion of the borehole. It is not always possible to complete a borehole and have the samples shipped to the laboratory within the hold time requirements. Duplicate RPD for Uranium 238 (38.9%) was above the acceptance limit (35) in 1E05003-DUP1 for ICPMS-Tc-U-WE The sample result is less than 10 times the detection limits. Duplicate recoveries are not applicable to this analyte. Duplicate RPD for Silver 107 (68.2%) was above the acceptance limit (35) in 2C06004-DUP1 for ICPMS-RCRA-AE The sample result is less than 10 times the detection limits. Duplicate recoveries are not applicable to this analyte. Matrix Spike Recovery for Chromium, Hexavalent (48.8%) was outside acceptance limits (75-125) in 1E23001-MS1 for Hexavalent Chromium/Soil. Potential Matrix interference. Sample results associated with this batch are below the EQL. There should be no impact to the data as reported. Matrix Spike Recovery for Chromium, Hexavalent (50.2%) was outside acceptance limits (75-125) in 2B22010-MS1 for Hexavalent Chromium/Soil. Potential Matrix interference. Sample results associated with this batch are below the EQL. There should be no impact to the data as reported.

  6. Intra-Hour Dispatch and Automatic Generator Control Demonstration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    at San Diego (UCSD) is leading a project that will reduce power system operation cost by providing a prediction of the generation fleet's behavior in real time for realistic...

  7. BioenergizeME Office Hours Webinar: Biomass Basics

    Broader source: Energy.gov [DOE]

    Many students haven’t thought much about biomass as an option for generating electricity, transportation fuels, and other products. The Biomass Basics Webinar provides general information about bioenergy, its creation, and its potential uses, and is designed to assist teams competing in the 2016 BioenergizeME Infographic Challenge. This challenge, hosted by the U.S. Department of Energy’s Bioenergy Technologies Office (BETO), is a competition for high school students to learn about bioenergy, create infographics to present what they have learned, and share their infographics on social media. This webinar is part of the BioenergizeME Office Hours webinar series developed by BETO in conjunction with the 2016 BioenergizeME Infographic Challenge.

  8. New York City Cabdrivers' Labor Supply Revisited: Reference-Dependence Preferences with Rational-Expectations Targets for Hours and Income

    E-Print Network [OSTI]

    Crawford, Vincent P.; Meng, Juanjuan

    2008-01-01

    the hours and income that would maximize consumption utilitythe income and hours that would maximize consumption utility

  9. UNIVERSITY OF CALIFORNIA, DAVIS ACADEMIC SENATE REQUEST TO TEACH AN UNDERGRADUATE VARIABLE-UNIT COURSE

    E-Print Network [OSTI]

    Ishida, Yuko

    UNIVERSITY OF CALIFORNIA, DAVIS ACADEMIC SENATE REQUEST TO TEACH AN UNDERGRADUATE VARIABLE-UNIT/Major Number Section Units Quarter Offered Year Estimated average student/faculty contact (hours for awarding a passing grade. Student Major Address Phone Email Student ID Total number of units completed

  10. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    " 1Total U.S. includes all primary occupied housing units in the 50 States and the District of Columbia. Vacant housing units, seasonal units, second homes, military...

  11. United States Environmental

    E-Print Network [OSTI]

    Al Faruque, Mohammad Abdullah

    Protect Your Family From Lead in Your Home United States Environmental Protection Agency United States Consumer Product Safety Commission United States Department of Housing and Urban Development

  12. Coiled tubing; Operations and services

    SciTech Connect (OSTI)

    Welch, J.L.; Stephens, R.K. )

    1992-09-01

    This paper reports on coiled tubing units which are used for many types of remedial well operations, including sand plugbacks, cement squeezes, fill cleanouts, underreaming, acid stimulations, and fishing. Fishing operations include removal of inflatable bridge plugs, lock mandrels stuck in profile nipples, coiled tubing, coiled tubing bottomhole assemblies (BHAs) and wireline. Recommended guidelines for selecting candidates, proper tool string configuration and operational techniques are presented here to assist coiled tubing supervisors and company representatives in the planning and implementation of efficient and effective fishing operations. Treatment of these areas are not intended to be exhaustive, but rather generally representative of common applications. Each fishing operation requires individualized analysis and planning.

  13. Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy under contract DE-AC04-94AL85000.

    E-Print Network [OSTI]

    Ray, Jaideep

    , for the United States Department of Energy under contract DE-AC04-94AL85000. #12;CO2 Emissions · CO2 responsible) emissions and CO/CO2 FF emissions predicted using population density, economic factors ("bottoms forcing. #12;ROM-based CO2 Source Inversion The convection-diffusion equation is used t

  14. Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy s National Nuclear Security Administration under contract DE-AC04-94AL85000.

    E-Print Network [OSTI]

    Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company85000. Status of Z-Pinch ICF ResearchStatus of Z-Pinch ICF Research Fusion Power Associates Meeting

  15. EPA ENERGY STAR Webcast: Portfolio Manager Office Hours, Focus Topic: Sharing Forward and Transfer Ownership

    Broader source: Energy.gov [DOE]

    Portfolio Manager "Office Hours" is a live webinar that gives all users an opportunity to ask their questions directly to EPA in an open forum. In 2014, Office Hours will be held once a month. We...

  16. Energy Use per Worker-Hour: Evaluating the Contribution of Labor to Manufacturing Energy Use

    E-Print Network [OSTI]

    Zhang, Teresa; Dornfeld, David

    2007-01-01

    yields 64 MJ of primary energy use per worker-hour (EPWH).hour calculated based on primary energy cannot be used as awhich includes all primary energy except that supplied to

  17. Moab Project Logs 2 Million Work Hours Without Lost-Time Injury...

    Energy Savers [EERE]

    Logs 2 Million Work Hours Without Lost-Time Injury or Illness Moab Project Logs 2 Million Work Hours Without Lost-Time Injury or Illness March 31, 2014 - 12:00pm Addthis Empty...

  18. EPA ENERGY STAR Webcast- Portfolio Manager Office Hours, Focus Topic: Weather Data and Metrics

    Broader source: Energy.gov [DOE]

    Portfolio Manager "Office Hours" is a live webinar that gives all users an opportunity to ask their questions directly to EPA in an open forum. In 2014, Office Hours will be held once a month. We...

  19. DOE Publishes 20K Hour Testing Results for 2008 GATEWAY Bridge...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    20K Hour Testing Results for 2008 GATEWAY Bridge Installation DOE Publishes 20K Hour Testing Results for 2008 GATEWAY Bridge Installation October 9, 2014 - 12:00pm Addthis The U.S....

  20. Kenya Hourly DNI, GHI and Diffuse Solar Data - Datasets - OpenEI...

    Open Energy Info (EERE)

    Kenya Hourly DNI, GHI and Diffuse Solar Data Abstract Each data file is a set of hourly values of solar radiation (DNI, GHI and diffuse) and meteorological elements for a 1-year...

  1. Pilot Plant Completes Two 1,000-Hour Ethanol Performance Runs...

    Office of Environmental Management (EM)

    Pilot Plant Completes Two 1,000-Hour Ethanol Performance Runs Pilot Plant Completes Two 1,000-Hour Ethanol Performance Runs October 19, 2015 - 12:38pm Addthis ICM Inc. announced...

  2. Hacking Away at Soft Costs: 24-Hour Coding Event Focuses on Expanding...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hacking Away at Soft Costs: 24-Hour Coding Event Focuses on Expanding Solar Market Hacking Away at Soft Costs: 24-Hour Coding Event Focuses on Expanding Solar Market May 7, 2014 -...

  3. Advanced Materials for RSOFC Dual Operation with Low Degradation

    SciTech Connect (OSTI)

    Eric, Tang; Tony, Wood; Sofiane, Benhaddad; Casey, Brown; Hongpeng, He; Jeff, Nelson; Oliver, Grande; Ben, Nuttall; Mark, Richards; Randy, Petri

    2012-12-27

    Reversible solid oxide fuel cells (RSOFCs) are energy conversion devices. They are capable of operating in both power generation mode (SOFC) and electrolysis modes (SOEC). RSOFC can integrate renewable production of electricity and hydrogen when power generation and steam electrolysis are coupled in a system, which can turn intermittent solar and wind energy into "firm power." In this DOE EERE project, VPS continuously advanced RSOFC cell stack technology in the areas of endurance and performance. Over 20 types of RSOFC cells were developed in the project. Many of those exceeded performance (area specific resistance less than 300 mohmcm2) and endurance (degradation rate less than 4% per 1000 hours) targets in both fuel cell and electrolysis modes at 750C. One of those cells, RSOFC-7, further demonstrated the following: Steady-state electrolysis with a degradation rate of 1.5% per 1000 hours. Ultra high current electrolysis over 3 A/cm2 at 75% water electrolysis efficiency voltage of 1.67 V. Daily SOFC/SOEC cyclic test of over 600 days with a degradation rate of 1.5% per 1000 hours. Over 6000 SOFC/SOEC cycles in an accelerated 20-minute cycling with degradation less than 3% per 1000 cycles. In RSOFC stack development, a number of kW-class RSOFC stacks were developed and demonstrated the following: Steady-state electrolysis operation of over 5000 hours. Daily SOFC/SOEC cyclic test of 100 cycles. Scale up capability of using large area cells with 550 cm2 active area showing the potential for large-scale RSOFC stack development in the future. Although this project is an open-ended development project, this effort, leveraging Versa Power Systems' years of development experience, has the potential to bring renewable energy RSOFC storage systems significantly closer to commercial viability through improvements in RSOFC durability, performance, and cost. When unitized and deployed in renewable solar and wind installations, an RSOFC system can enable higher availability for intermittent renewable resources, thereby improving the commercial viability of these types of energy resources.

  4. Termination unit

    DOE Patents [OSTI]

    Traeholt, Chresten [Frederiksberg, DK; Willen, Dag [Klagshamn, SE; Roden, Mark [Newnan, GA; Tolbert, Jerry C [Carrollton, GA; Lindsay, David [Carrollton, GA; Fisher, Paul W [Heiskell, TN; Nielsen, Carsten Thidemann [Jaegerspris, DK

    2014-01-07

    This invention relates to a termination unit comprising an end-section of a cable. The end section of the cable defines a central longitudinal axis and comprising end-parts of N electrical phases, an end-part of a neutral conductor and a surrounding thermally insulation envelope adapted to comprising a cooling fluid. The end-parts of the N electrical phases and the end-part of the neutral conductor each comprising at least one electrical conductor and being arranged in the cable concentrically around a core former with a phase 1 located relatively innermost, and phase N relatively outermost in the cable, phase N being surrounded by the neutral conductor, electrical insulation being arrange between neighboring electrical phases and between phase N and the neutral conductor, and wherein the end-parts of the neutral conductor and the electrical phases each comprise a contacting surface electrically connected to at least one branch current lead to provide an electrical connection: The contacting surfaces each having a longitudinal extension, and being located sequentially along the longitudinal extension of the end-section of the cable. The branch current leads being individually insulated from said thermally insulation envelope by individual electrical insulators.

  5. Weather conditions affecting VTOL airbus operations in the Northeast Corridor

    E-Print Network [OSTI]

    Simpson, R. W.

    1966-01-01

    A detailed study of hourly weather observations in the Northeast Corridor during the periods 0600-2400 for a ten year period 1944-1958 was made to study the implications of weather affecting the operations of a VSTOL Airbus ...

  6. Small Units inside Large Units 8.1 Experimental units bigger than observational units

    E-Print Network [OSTI]

    Bailey, R. A.

    Chapter 8 Small Units inside Large Units 8.1 Experimental units bigger than observational units 8, but it is individual people that are measured. In general, suppose that there are m experimental units, each of which consists of k observational units, and that there are t treatments, each of which is applied

  7. Scalable Tuning of Building Models to Hourly Data

    SciTech Connect (OSTI)

    Garrett, Aaron; New, Joshua Ryan

    2015-01-01

    Energy models of existing buildings are unreliable unless calibrated so they correlate well with actual energy usage. Manual tuning requires a skilled professional, is prohibitively expensive for small projects, imperfect, non-repeatable, non-transferable, and not scalable to the dozens of sensor channels that smart meters, smart appliances, and cheap/ubiquitous sensors are beginning to make available today. A scalable, automated methodology is needed to quickly and intelligently calibrate building energy models to all available data, increase the usefulness of those models, and facilitate speed-and-scale penetration of simulation-based capabilities into the marketplace for actualized energy savings. The ``Autotune'' project is a novel, model-agnostic methodology which leverages supercomputing, large simulation ensembles, and big data mining with multiple machine learning algorithms to allow automatic calibration of simulations that match measured experimental data in a way that is deployable on commodity hardware. This paper shares several methodologies employed to reduce the combinatorial complexity to a computationally tractable search problem for hundreds of input parameters. Accuracy metrics are provided which quantify model error to measured data for either monthly or hourly electrical usage from a highly-instrumented, emulated-occupancy research home.

  8. Atmospheric Radiation Measurement Program Climate Research Facility Operations Cumulative Quarterly Report October 1, 2003 - September 30, 2004

    SciTech Connect (OSTI)

    DL Sisterson

    2004-09-30

    Description. Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The United States Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 – (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The annual OPSMAX time for the Southern Great Plains (SGP) site is 8,322 hours per year (0.95 × 8,760, the number hours in a year, not including leap year). The annual OPSMAX for the North Slope Alaska (NSA) site is 7,884 hours per year (0.90 × 8,760), and that for the Tropical Western Pacific (TWP) site is 7,446 hours per year (0.85 × 8,760). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the ACRF Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of data in the Archive represents the average percent of the time (24 hours per day, 365 days per year) the instruments were operating.

  9. Fundamentals of Propulsion Class/Laboratory Schedule: four lecture hours per week, eight hours outside preparation. 12

    E-Print Network [OSTI]

    Fainman, Yeshaiahu

    and space vehicle propulsion. Analysis and design of gas turbines, inlets, compressors, combustion chambers and Required Materials: Jack D. Mattingly, Elements of Propulsion, Gas Turbines and Rockets, AIAA Education, and compressible flow fundamentals in the operation of air breathing engines (gas turbines). [1a, 3c, 5e, 9i, AE12

  10. Current and historical trends in general aviation in the United States

    E-Print Network [OSTI]

    Shetty, Kamala Irene

    2012-01-01

    General aviation (GA) is an important component of aviation in the United States. In 2011, general aviation and air taxi operations represented 63% of all towered operations in the United States, while commercial aviation ...

  11. Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000.

    E-Print Network [OSTI]

    Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company85000. Progress on Z-Pinch Inertial Fusion Energy Craig L. Olson Sandia National Laboratories Albuquerque, NM 87185 USA 20th IAEA Fusion Energy Conference Vilamoura, Portugal 1-6 November 2004 RTL DH

  12. Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000.

    E-Print Network [OSTI]

    Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company Corporation, Albuquerque, NM, USA 15) EG&G, Albuquerque, NM, USA 16) Omicron, Albuquerque, NM, USA 17) Fusion #12;Z-Pinch is the newest of the three major drivers for IFE 1999 Snowmass Fusion Summer Study, IAEA

  13. Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy s National Nuclear Security Administration under contract DE-AC04-94AL85000.

    E-Print Network [OSTI]

    Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company85000. Z-Pinch Inertial Fusion Energy Craig L. Olson + Z-IFE Team Sandia National Laboratories Albuquerque, NM 87185 Fusion Power Associates Annual Meeting and Symposium Washington, DC October 11-12, 2005

  14. LA-UR 95-0371 Los Alamos National Laboratory is operated by the University of California for the United States Department of Energy under contract W-7405-ENG-36.

    E-Print Network [OSTI]

    LA-UR 95-0371 Los Alamos National Laboratory is operated by the University of California others to do so, for U.S. Government purposes. The Los Alamos National Laboratory requests Alamos National Laboratory Los Alamos, New Mexico 87545 FORM NO. 836R4 ST. NO. 2629 581 #12

  15. operations center

    National Nuclear Security Administration (NNSA)

    servers and other critical Operations Center equipment

  16. Independent air supply system filtered to protect against biological and radiological agents (99.7%).
  17. <...

  18. Inventory of Electric Utility Power Plants in the United States

    Reports and Publications (EIA)

    2002-01-01

    Final issue of this report. Provides detailed statistics on existing generating units operated by electric utilities as of December 31, 2000, and certain summary statistics about new generators planned for operation by electric utilities during the next 5 years.

  19. INTEGRATED OCEAN DRILLING PROGRAM United States Implementing Organization

    E-Print Network [OSTI]

    INTEGRATED OCEAN DRILLING PROGRAM United States Implementing Organization JOI Alliance Joint Oceanographic Institutions, Inc. Executive Director, Ocean Drilling Programs Joint Oceanographic Institutions ........................................................................................................... 6 1.2.1. Lead Agency Guidance: Platform Operating Costs vs. Science Operating Costs.............. 6

  20. Centrifugal contactor operations for UREX process flowsheet. An update

    SciTech Connect (OSTI)

    Pereira, Candido; Vandegrift, George F.

    2014-08-01

    The uranium extraction (UREX) process separates uranium, technetium, and a fraction of the iodine from the other components of the irradiated fuel in nitric acid solution. In May 2012, the time, material, and footprint requirements for treatment of 260 L batches of a solution containing 130 g-U/L were evaluated for two commercial annular centrifugal contactors from CINC Industries. These calculated values were based on the expected volume and concentration of fuel arising from treatment of a single target solution vessel (TSV). The general conclusions of that report were that a CINC V-2 contactor would occupy a footprint of 3.2 m 2 (0.25 m x 15 m) if each stage required twice the nominal footprint of an individual stage, and approximately 1,131 minutes or nearly 19 hours is required to process all of the feed solution. A CINC V-5 would require approximately 9.9 m 2 (0.4 m x 25 m) of floor space but would require only 182 minutes or ~ 3 hours to process the spent target solution. Subsequent comparison with the Modular Caustic Side Solvent Extraction Unit (MCU) at Savannah River Site (SRS) in October 2013 suggested that a more compact arrangement is feasible, and the linear dimension for the CINC V-5 may be reduced to about 8 m; a comparable reduction for the CINC V-2 yields a length of 5 m. That report also described an intermediate-scale (10 cm) contactor design developed by Argonne in the early 1980s that would better align with the SHINE operations as they stood in May 2012. In this report, we revisit the previous evaluation of contactor operations after discussions with CINC Industries and analysis of the SHINE process flow diagrams for the cleanup of the TSV, which were not available at the time of the first assessment.

  21. UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    LBP-09-04 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD In the Matter of CALVERT CLIFFS 3 NUCLEAR PROJECT, LLC, and UNISTAR NUCLEAR OPERATING SERVICES, LLC (Combined This case arises from an application by UniStar Nuclear Operating Services, LLC and Calvert Cliffs 3 Nuclear

  22. United Nations Programme on

    E-Print Network [OSTI]

    Schrijver, Karel

    United Nations Programme on Space Applications UNITED NATIONS UNITED NATIONS OFFICE FOR OUTER SPACE, Sputnik 1. Soon after that event, the Member States of the United Nations declared that space should and natural resources management. At the first United Nations Conference on the Exploration and Peaceful Uses

  1. A Fourier series model to predict hourly heating and cooling energy use in commercial buildings with outdoor temperature as the only weather variable

    SciTech Connect (OSTI)

    Dhar, A. [Enron Corp., Houston, TX (United States); Reddy, T.A. [Drexel Univ., Philadelphia, PA (United States). Civil and Architectural Engineering Dept.; Claridge, D.E. [Texas A and M Univ., College Station, TX (United States). Energy Systems Lab.

    1999-02-01

    Accurate modeling of hourly heating and cooling energy use in commercial buildings can be achieved by a Generalized Fourier Series (GFS) approach involving weather variables such as dry-bulb temperature, specific humidity and horizontal solar flux. However, there are situations when only temperature data is available. The objective of this paper is to (i) describe development of a variant of the GFS approach which allows modeling both heating and cooling hourly energy use in commercial buildings with outdoor temperature as the only weather variable and (ii) illustrate its application with monitored hourly data from several buildings in Texas. It is found that the new Temperature based Fourier Series (TFS) approach (1) provides better approximation to heating energy use than the existing GFS approach, (ii) can indirectly account for humidity and solar effects in the cooling energy use, (iii) offers physical insight into the operating pattern of a building HVAC system and (iv) can be used for diagnostic purposes.

  2. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    2 Water Heating in U.S. Homes, by OwnerRenter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings With"...

  3. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Pacific Southwest Forest and Range symposium dealing with this subject in the western United States, the papers presented address current ........................................................................................................................................ 1 Annosus Root Disease in Europe and the Southeastern United States: Occurrence, Research

  4. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Northeastern Forest Experiment Station research unit in New Hampshirein 1957, where he studied problemsof regenerationandthinning research unit at Warren, Pennsylvania, where he headed a program of research on problems related

  5. Unit 35 - Raster Storage

    E-Print Network [OSTI]

    Unit 35, CC in GIS; Peuquet, Donna

    1990-01-01

    in GIS - 1990 Page 8 Unit 35 - Raster Storage GIS to whichNCGIA Core Curriculum in GIS - 1990 Page 9 Unit 35 - RasterStorage UNIT 35 IMAGES NCGIA Core Curriculum in GIS - 1990

  6. JOURNAL OF OPTIMIZATION THEORY AND APPLICATIONS: Vol. 105, No. 3, pp. 707730, JUNE 2000 Solving the Unit Commitment Problem by a

    E-Print Network [OSTI]

    Oren, Shmuel S.

    the Unit Commitment Problem by a Unit Decommitment Method1,2 C. L. TSENG,3 C. A. LI,4 AND S. S. OREN 5 Abstract. In this paper, we present a unified decommitment method to solve the unit commitment problem. This method starts with a solu- tion having all available units online at all hours in the planning horizon

  7. Operating Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

  8. Operational health physics training

    SciTech Connect (OSTI)

    1992-06-01

    The initial four sections treat basic information concerning atomic structure and other useful physical quantities, natural radioactivity, the properties of {alpha}, {beta}, {gamma}, x rays and neutrons, and the concepts and units of radiation dosimetry (including SI units). Section 5 deals with biological effects and the risks associated with radiation exposure. Background radiation and man-made sources are discussed next. The basic recommendations of the ICRP concerning dose limitations: justification, optimization (ALARA concepts and applications) and dose limits are covered in Section seven. Section eight is an expanded version of shielding, and the internal dosimetry discussion has been extensively revised to reflect the concepts contained in the MIRD methodology and ICRP 30. The remaining sections discuss the operational health physics approach to monitoring radiation. Individual sections include radiation detection principles, instrument operation and counting statistics, health physics instruments and personnel monitoring devices. The last five sections deal with the nature of, operation principles of, health physics aspects of, and monitoring approaches to air sampling, reactors, nuclear safety, gloveboxes and hot cells, accelerators and x ray sources. Decontamination, waste disposal and transportation of radionuclides are added topics. Several appendices containing constants, symbols, selected mathematical topics, and the Chart of the Nuclides, and an index have been included.

  9. Results Of Routine Strip Effluent Hold Tank, Decontaminated Salt Solution Hold Tank, And Caustic Wash Tank Samples From Modular Caustic-Side Solvent Extraction Unit During Macrobatch 4 Operations

    SciTech Connect (OSTI)

    Peters, T. B.; Fink, S. D.

    2012-10-25

    Strip Effluent Hold Tank (SEHT), Decontaminated Salt Solution Hold Tank (DSSHT), and Caustic Wash Tank (CWT) samples from several of the ?microbatches? of Integrated Salt Disposition Project (ISDP) Salt Batch (?Macrobatch?) 4 have been analyzed for {sup 238}Pu, {sup 90}Sr, {sup 137}Cs, and by inductively-coupled plasma emission spectroscopy (ICPES). Furthermore, samples from the CWT have been analyzed by a variety of methods to investigate a decline in the decontamination factor (DF) of the cesium observed at MCU. The results indicate good decontamination performance within process design expectations. While the data set is sparse, the results of this set and the previous set of results for Macrobatch 3 samples indicate generally consistent operations. There is no indication of a disruption in plutonium and strontium removal. The average cesium DF and concentration factor (CF) for samples obtained from Macrobatch 4 are slightly lower than for Macrobatch 3, but still well within operating parameters. The DSSHT samples show continued presence of titanium, likely from leaching of the monosodium titanate in Actinide Removal Process (ARP).

  10. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Pacific Southwest Research Station General assigned to the Station's research unit studying the regeneration of California forests

  11. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture MIX: A Computer Program to Evaluate Forest Service, a research entomologist, is in charge of the unit developing improved technology for integrated management

  12. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Pacific Southwest Research Station General Programs: A Review of Cognitive and Behavioral Studies Introduction Recent wildfires in the Western United

  13. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Pacific Southwest Forest and Range to the Chaparral Prescribed Fire Research Unit, headquartered at Riverside, California. Publisher: Pacific

  14. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Pacific Southwest Research Station General is a Research Ecologist at the Station's Timber Management/Wildlife Habitat Interactions Unit, Redwood Sciences

  15. United States of Agriculture

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Pacific Southwest Research Station General scientist with the Station's Wildland Recreation and Urban Cultures Research Unit, 4955 Canyon Crest Drive

  16. United States Department of

    E-Print Network [OSTI]

    Kurapov, Alexander

    A United States Department of Agriculture Forest Service Pacific Northwest Research Station General, land management, carbon sequestration, carbon markets, United States. #12;ii Executive Summary

  17. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Intermountain Research Station General acrossthe United States provide estimates of the amount of erosion reductionon forest roadsfrom

  18. United States Department of

    E-Print Network [OSTI]

    94701 United States Department of Agriculture Forest Service Pacific Southwest Forest and Range of California, Berkeley, and a cooperator with the Research Unit. #12;Acknowledgments We especially acknowledge

  19. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Pacific Southwest Forest and Range to the Station's chaparral and related ecosystems research unit, with headquarters at Riverside, California. He

  20. United States Department of

    E-Print Network [OSTI]

    United States Department of California Oaks: A Bibliography Agriculture Forest Service Pacific forester in the Station's Forest Regeneration Research Unit, at Redding, California. He holds bachelor

  1. United States Department of

    E-Print Network [OSTI]

    Wang, Changlu

    United States Department of Agriculture Rural Business- Cooperative Service Research Report 157, concentration, globalization, agency theory Cooperatives in a Changing Global Food System United States

  2. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Pacific Southwest Research Station General is a supervisory research entomologist in the Station's Regeneration Insect Research Unit in Berkeley. W. WAYNE

  3. Study of an integrated appliance, the air conditioner/heat pump-heat recovery unit-water heater. Final report, November 1980

    SciTech Connect (OSTI)

    Tu, K.M.; Davies, A.; Fischler, S.

    1981-02-01

    Three integrated heat-pump - heat-recovery-unit - water-heater appliances were tested under various environmental conditions to measure the functional parameters and study the operating characteristics of these systems. It was found that the heat recovery, heat-recovery rate, and heat-recovery efficiency were dependent on the heat-recovery-unit's characteristics. The use of the heat-recovery unit in the system resulted in a reduced work load for the heat pump's compressor and slightly improved the heat-pump's performance. A computer simulation model of the integrated system was developed to study the interactions between several of the pertinent system variables on an hourly basis for selected situations and to estimate energy savings. Two alternative estimation methods that utilize five-degree temperature bin data were also developed. The estimate savings determined by using the alternative methods were about the same as those estimated using the hourly data. Conclusions were also reached concerning the use of water heaters with different tank capacities and on methods of increasing potential energy savings.

  4. 1052 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 25, NO. 2, MAY 2010 Co-Optimization of Generation Unit Commitment

    E-Print Network [OSTI]

    Oren, Shmuel S.

    Unit Commitment and Transmission Switching With N-1 Reliability Kory W. Hedman, Student Member, IEEE present a co-optimization formulation of the generation unit commitment and transmission switching problem to hour. We also show that optimizing the topology can change the optimal unit commitment schedule

  5. 1538 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 20, NO. 3, AUGUST 2005 Security-Constrained Unit Commitment

    E-Print Network [OSTI]

    Fu, Yong

    1538 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 20, NO. 3, AUGUST 2005 Security-Constrained Unit the security-constrained unit commitment (SCUC) program to plan a secure and economical hourly generation approach applies the Benders decomposition for separating the unit commitment (UC) in the master problem

  6. United States Government Accountability Office GAO Report to Congressional Committees

    E-Print Network [OSTI]

    United States Government Accountability Office GAO Report to Congressional Committees FUSION ENERGY The United States is pursuing two paths to fusion energy--magnetic and inertial. On November 21, 2006 of magnetic fusion energy. The United States also built and operates facilities to pursue inertial fusion

  7. AMEX process can return system to use within hours

    SciTech Connect (OSTI)

    NONE

    1996-06-01

    In North America, only a small percentage (3--4%) of gas pipe installation and rehabilitation utilizes trenchless technology. Statistics from the American Gas Association show that the gas industry annually installs approximately 25,000 miles of new and replacement distribution lines each year. The rehabilitation and upgrading of gas distribution mains have become more important to gas utilities nationwide as their systems begin to show the inevitable signs of age. Patch and repair methods are often temporary stopgap measures that don`t solve the real problems of deteriorating pipelines. Yet, tight operating budgets and the location of gas lines on busy thoroughfares often prohibit trenching and other activities associated with installation of a new main. Miller Pipeline Corp. offers utilities lining technology for the rehabilitation of gas distribution pipelines at a fraction of the cost of replacement. Company officials say there is no loss of flow capacity and services can be tapped directly without the need for special fittings. The lining system provides zero-migration of gas after installation and will allow a pressure upgrade for the line. This paper reviews the cleaning and lining process used.

  8. Laminated microchannel devices, mixing units and method of making same

    DOE Patents [OSTI]

    Bennett, Wendy D [Kennewick, WA; Hammerstrom, Donald J [West Richland, WA; Martin, Peter M [Kennewick, WA; Matson, Dean W [Kennewick, WA

    2002-10-17

    A laminated microchannel device is described in which there is a unit operation process layer that has longitudinal channel. The longitudinal channel is cut completely through the layer in which the unit process operation resides. Both the device structure and method of making the device provide significant advantages in terms of simplicity and efficiency. A static mixing unit that can be incorporated in the laminated microchannel device is also described.

  9. Operating Strategies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeeding access toOctober 1996Technologies /JuneOperating Oak Ridge'sOPERATING

  10. Environmental Management Richland Operations Office FY 2014 President...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    layoffs and furlough to workers * The following TPA milestone commitment dates are at risk: Submit Draft B, 200-IS-1 Operable Unit Pipeline System Waste Sites RFICMSRIFS...

  11. US Government Outsourcing, the Private Military Industry, and Operation Iraqi Freedom: A Case Study in Conflict Contracting

    E-Print Network [OSTI]

    Halpin, Allison Ann

    2011-12-31

    CRS – Congressional Research Service CTSO – Counter Terrorism / Special Operations DCAA – Defense Contract Audit Agency DCMA – Defense Contract Management Agency DFAR – Defense Federal Acquisition Regulation DLA – Defense Logistics Agency DOD... and Operational Tracker UN – United Nations UNAVEM – United Nations Angola Verification Mission UNITA – National Union for the Total Independence of Angola US – United States USG – United States Government USAID – United States Agency for International...

  12. Results Of Routine Strip Effluent Hold Tank, Decontaminated Salt Solution Hold Tank, Caustic Wash Tank And Caustic Storage Tank Samples From Modular Caustic-Side Solvent Extraction Unit During Macrobatch 6 Operations

    SciTech Connect (OSTI)

    Peters, T. B.

    2013-10-01

    Strip Effluent Hold Tank (SEHT), Decontaminated Salt Solution Hold Tank (DSSHT), Caustic Wash Tank (CWT) and Caustic Storage Tank (CST) samples from several of the ''microbatches'' of Integrated Salt Disposition Project (ISDP) Salt Batch (''Macrobatch'') 6 have been analyzed for {sup 238}Pu, {sup 90}Sr, {sup 137}Cs, and by Inductively Coupled Plasma Emission Spectroscopy (ICPES). The results from the current microbatch samples are similar to those from comparable samples in Macrobatch 5. From a bulk chemical point of view, the ICPES results do not vary considerably between this and the previous macrobatch. The titanium results in the DSSHT samples continue to indicate the presence of Ti, when the feed material does not have detectable levels. This most likely indicates that leaching of Ti from MST in ARP continues to occur. Both the CST and CWT samples indicate that the target Free OH value of 0.03 has been surpassed. While at this time there is no indication that this has caused an operational problem, the CST should be adjusted into specification. The {sup 137}Cs results from the SRNL as well as F/H lab data indicate a potential decline in cesium decontamination factor. Further samples will be carefully monitored to investigate this.

  13. Bachelor of Arts in Astronomy Degree Courses Total Hours In Core and Departmental Requirements: 107

    E-Print Network [OSTI]

    Turc, Catalin

    . If another Capstone is taken the number of hours may be different. Physics Hours: 29 PHYS 121 General Physics I: Mechanics................................. (4) PHYS 122 General Physics II: Electricity and Magnetism ...... (4) PHYS 221 General Physics III: Modern Physics ..................... (3) PHYS 250

  14. Quantification of Variability and Uncertainty in Hourly NOx Emissions from Coal-Fired Power Plants

    E-Print Network [OSTI]

    Frey, H. Christopher

    1 Quantification of Variability and Uncertainty in Hourly NOx Emissions from Coal-Fired Power to quantify variability and uncertainty for NOx emissions from coal-fired power plants. Data for hourly NOx Uncertainty, Variability, Emission Factors, Coal-Fired Power Plants, NOx emissions, Regression Models

  15. Siteclimate: a program to create hourly site-specific weather data

    E-Print Network [OSTI]

    Arens, E.; Lee, E.; Bauman, F.; Flynn, L.

    1985-01-01

    a program to create hourly weather tapes f o r s p e c i f in of t y p i c a l hourly weather data f o r energy c a l ci t e - S p e c i f i c Weather Data E. Arens, Ph.D. ASHRAE

  16. RA After Hours On Call (971) 246-1388 Your Guide to

    E-Print Network [OSTI]

    Latiolais, M. Paul

    on the first floor, and in the first floor lobby of the Ondine Building. Heat Broadway uses baseboard heating floor and retail space on the ground floor. Each studio features loft-like cement floors and a modern (503) 725-4404 RA After Hours On Call FYE (floors 3-7) (971) 246-1386 RA After Hours On Call Upper

  17. UNBOUNDED FREDHOLM OPERATORS AND MICHAEL JOACHIM

    E-Print Network [OSTI]

    Joachim, Michael

    UNBOUNDED FREDHOLM OPERATORS AND K-THEORY MICHAEL JOACHIM Abstract. Let A be a unital C #3). 1. Introduction For a unital complex C #3; -algebra A and a compact space X let K 0 (X ; A) denote K 0 (X ; A) #24; = K 0 (XA). The corresponding reduced groups are de#12;ned by e K 0 (X ; A) = Coker

  18. Energy Use in Distillation Operation: Nonlinear Economic Effects 

    E-Print Network [OSTI]

    White, D. C.

    2010-01-01

    Distillation operations are major consumers of energy, by some estimates comprising forty percent of the energy usage in the refining and chemicals industry. Obtaining the maximum energy efficiency from this unit operation is obviously very...

  19. Molten salt coal gasification process development unit. Phase 1. Volume 2. Commercial plant study. Final report

    SciTech Connect (OSTI)

    Kohl, Arthur L.

    1980-05-01

    This report summarizes the results of a test program conducted on the Molten Salt Coal Gasification Process, which included the design, construction, and operation of a Process Development Unit (PDU). This process, coal is gasified by contacting it with air in a turbulent pool of molten sodium carbonate. Sulfur and ash are retained in the melt, and a small stream is continuously removed from the gasifier for regeneration of the salt. The process can handle a wide variety of feed materials, including highly caking coals, and produces a gas relatively free from tars and other impurities. The gasification step is carried out at approximately 1800/sup 0/F. The PDU was designed to process 1 ton per hour of coal at pressures up to 20 atm. It is a completely integrated facility including systems for feeding solids to the gasifier, regenerating sodium carbonate for reuse, and removing sulfur and ash in forms suitable for disposal. Five extended test runs were made. The observed product gas composition was quite close to that predicted on the basis of earlier small-scale tests and thermodynamic considerations. All plant systems were operated in an integrated manner. Test data and discussions regarding plant equipment and process performance are presented. The program also included a commercial plant study which showed the process to be attractive for use in a combined cycle, electric power plant. The report is presented in two volumes, Volume 1, PDU Operations, and Volume 2, Commercial Plant Study.

  20. Operation Poorman

    SciTech Connect (OSTI)

    Pruvost, N.; Tsitouras, J.

    1981-03-18

    The objectives of Operation Poorman were to design and build a portable seismic system and to set up and use this system in a cold-weather environment. The equipment design uses current technology to achieve a low-power, lightweight system that is configured into three modules. The system was deployed in Alaska during wintertime, and the results provide a basis for specifying a mission-ready seismic verification system.

  1. General Education Coursework: Credit Hours General Education Coursework: Credit Hours *ENGL 110C English Composition I 3 *ENGL 211C, 221C, 231C English Comp II 3

    E-Print Network [OSTI]

    as Foundation for Practice 2 NURS 360: Adult Health 2 2 NURS 372: Foundations of Pharmacology for Nursing in Nursing Care of the Older Adult 1 NURS 470: Community I 1 NURS 471: Community Interactions I 1 Major Major Coursework: Credit Hours NURS 300: Foundational Concepts 3 NURS 311: Nutrition of Nursing Practice

  2. United States of Agriculture

    E-Print Network [OSTI]

    United States Department of Agriculture DESIGN: A Program to Create Data Forest Service Entry Research Work Unit at the Station's Forest Fire Laboratory, 4955 Canyon Crest Drive, Riverside, CA 92507

  3. United Sates Environmental Protection

    E-Print Network [OSTI]

    Bowen, James D.

    United Sates Environmental Protection Agency Office of Water (4305) EPA/823/B/95/003 August 1995 QUAL2E Windows Interface User's Guide #12;QUAL2E Windows Interface User's Guide United States

  4. United States of Agriculture

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Pacific Southwest Research Station General Observatory in Stinson Beach, Calif. Thomas E. Martin is Assistant Unit Leader--Wildlife at the U.S. Fish

  5. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Pacific Southwest Forest and Range, objectives, and targets and specific work plans for the field units--the National Forests and their Ranger

  6. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Pacific Northwest Research Station Research, and export from 1997 to 2010, for main world regions and the United States. Detailed tables by country

  7. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Peelflc Southwest Forest and Range that are expressed in tems familim to the user. Theboard footand cubic footare mdiriond units of measure, altlnough

  8. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Northeastern Research Station Research Paper-Central United States (Monserud and Ek 1977; Monserud 1987). This model was used within the framework of FOREST

  9. United States Department of

    E-Print Network [OSTI]

    #12;United States Department of Agriculture Forest Service Pacific Southwest Research Station for the Station's Wildland Recreation and the Urban Culture Research Work Unit, located at the Forest Fire

  10. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Usual Planting and Harvesting Dates for U.S. Field Crops million acres of barley were harvested in the United States (U.S.) during 1996. After reaching a peak

  11. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Pacific Northwest Research Station Research, import, and export from 1997 to 2010, for main world regions and the United States. Detailed tables

  12. Operations Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeeding access toOctober 1996Technologies /JuneOperating Oakoak ridge

  13. Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeeding access toOctober 1996Technologies /JuneOperating Oakoak

  14. Performing an allreduce operation using shared memory

    DOE Patents [OSTI]

    Archer, Charles J. (Rochester, MN); Dozsa, Gabor (Ardsley, NY); Ratterman, Joseph D. (Rochester, MN); Smith, Brian E. (Rochester, MN)

    2012-04-17

    Methods, apparatus, and products are disclosed for performing an allreduce operation using shared memory that include: receiving, by at least one of a plurality of processing cores on a compute node, an instruction to perform an allreduce operation; establishing, by the core that received the instruction, a job status object for specifying a plurality of shared memory allreduce work units, the plurality of shared memory allreduce work units together performing the allreduce operation on the compute node; determining, by an available core on the compute node, a next shared memory allreduce work unit in the job status object; and performing, by that available core on the compute node, that next shared memory allreduce work unit.

  15. Performing an allreduce operation using shared memory

    SciTech Connect (OSTI)

    Archer, Charles J; Dozsa, Gabor; Ratterman, Joseph D; Smith, Brian E

    2014-06-10

    Methods, apparatus, and products are disclosed for performing an allreduce operation using shared memory that include: receiving, by at least one of a plurality of processing cores on a compute node, an instruction to perform an allreduce operation; establishing, by the core that received the instruction, a job status object for specifying a plurality of shared memory allreduce work units, the plurality of shared memory allreduce work units together performing the allreduce operation on the compute node; determining, by an available core on the compute node, a next shared memory allreduce work unit in the job status object; and performing, by that available core on the compute node, that next shared memory allreduce work unit.

  16. The prototype detection unit of the KM3NeT detector

    E-Print Network [OSTI]

    KM3NeT Collaboration; S. Adrián-Martínez; M. Ageron; F. Aharonian; S. Aiello; A. Albert; F. Ameli; E. G. Anassontzis; M. Anghinolfi; G. Anton; S. Anvar; M. Ardid; T. Avgitas; K. Balasi; H. Band; G. Barbarino; E. Barbarito; F. Barbato; B. Baret; S. Baron; J. Barrios; A. Belias; E. Berbee; A. M. van den Berg; A. Berkien; V. Bertin; S. Beurthey; V. van Beveren; N. Beverini; S. Biagi; A. Biagioni; S. Bianucci; M. Billault; A. Birbas; H. Boer Rookhuizen; R. Bormuth; V. Bouché; B. Bouhadef; G. Bourlis; C. Boutonnet; M. Bouwhuis; C. Bozza; R. Bruijn; J. Brunner; G. Cacopardo; L. Caillat; M. Calamai; D. Calvo; A. Capone; L. Caramete; F. Caruso; S. Cecchini; A. Ceres; R. Cereseto; C. Champion; F. Château; T. Chiarusi; B. Christopoulou; M. Circella; L. Classen; R. Cocimano; A. Coleiro; S. Colonges; R. Coniglione; A. Cosquer; M. Costa; P. Coyle; A. Creusot; G. Cuttone; C. D'Amato; A. D'Amico; G. De Bonis; G. De Rosa; N. Deniskina; J. -J. Destelle; C. Distefano; F. Di Capua; C. Donzaud; D. Dornic; Q. Dorosti-Hasankiadeh; E. Drakopoulou; D. Drouhin; L. Drury; D. Durand; T. Eberl; D. Elsaesser; A. Enzenhöfer; P. Fermani; L. A. Fusco; D. Gajanana; T. Gal; S. Galatà; F. Garufi; M. Gebyehu; V. Giordano; N. Gizani; R. GraciaRuiz; K. Graf; R. Grasso; G. Grella; A. Grmek; R. Habel; H. van Haren; T. Heid; A. Heijboer; E. Heine; S. Henry; J. J. Hernández-Rey; B. Herold; M. A. Hevinga; M. van der Hoek; J. Hofestädt; J. Hogenbirk; C. Hugon; J. Hößl; M. Imbesi; C. W. James; P. Jansweijer; J. Jochum; M. de Jong; M. Jongen; M. Kadler; O. Kalekin; A. Kappes; E. Kappos; U. Katz; O. Kavatsyuk; P. Keller; G. Kieft; E. Koffeman; H. Kok; P. Kooijman; J. Koopstra; A. Korporaal; A. Kouchner; I. Kreykenbohm; V. Kulikovskiy; R. Lahmann; P. Lamare; G. Larosa; D. Lattuada; H. Le Provost; K. P. Leismüller; A. Leisos; D. Lenis; E. Leonora; M. LindseyClark; C. D. Llorens Alvarez; H. Löhner; A. Lonardo; S. Loucatos; F. Louis; E. Maccioni; K. Mannheim; K. Manolopoulos; A. Margiotta; O. Mari?; C. Markou; J. A. Martínez-Mora; A. Martini; R. Masullo; K. W. Melis; T. Michael; P. Migliozzi; E. Migneco; A. Miraglia; C. M. Mollo; M. Mongelli; M. Morganti; S. Mos; Y. Moudden; P. Musico; M. Musumeci; C. Nicolaou; C. A. Nicolau; A. Orlando; A. Orzelli; A. Papaikonomou; R. Papaleo; G. E. P?v?la?; H. Peek; C. Pellegrino; M. G. Pellegriti; C. Perrina; P. Piattelli; K. Pikounis; V. Popa; Th. Pradier; M. Priede; G. Pühlhofer; S. Pulvirenti; C. Racca; F. Raffaelli; N. Randazzo; P. A. Rapidis; P. Razis; D. Real; L. Resvanis; J. Reubelt; G. Riccobene; A. Rovelli; M. Saldaña; D. F. E. Samtleben; M. Sanguineti; A. Santangelo; P. Sapienza; J. Schmelling; J. Schnabel; V. Sciacca; M. Sedita; T. Seitz; I. Sgura; F. Simeone; V. Sipala; A. Spitaleri; M. Spurio; G. Stavropoulos; J. Steijger; T. Stolarczyk; D. Stransky; M. Taiuti; G. Terreni; D. Tézier; S. Théraube; L. F. Thompson; P. Timmer; L. Trasatti; A. Trovato; M. Tselengidou; A. Tsirigotis; S. Tzamarias; E. Tzamariudaki; B. Vallage; V. Van Elewyck; J. Vermeulen; P. Vernin; P. Vicini; S. Viola; D. Vivolo; P. Werneke; L. Wiggers; J. Wilms; E. de Wolf; R. H. L. van Wooning; E. Zonca; J. D. Zornoza; J. Zúñiga; A. Zwart

    2015-10-06

    A prototype detection unit of the KM3NeT deep-sea neutrino telescope has been installed at 3500m depth 80km offshore the Italian coast. KM3NeT in its final configuration will contain several hundreds of detection units. Each detection unit is a mechanical structure anchored to the sea floor, held vertical by a submerged buoy and supporting optical modules for the detection of Cherenkov light emitted by charged secondary particles emerging from neutrino interactions. This prototype string implements three optical modules with 31 photomultiplier tubes each. These optical modules were developed by the KM3NeT Collaboration to enhance the detection capability of neutrino interactions. The prototype detection unit was operated since its deployment in May 2014 until its decommissioning in July 2015. Reconstruction of the particle trajectories from the data requires a nanosecond accuracy in the time calibration. A procedure for relative time calibration of the photomultiplier tubes contained in each optical module is described. This procedure is based on the measured coincidences produced in the sea by the 40K background light and can easily be expanded to a detector with several thousands of optical modules. The time offsets between the different optical modules are obtained using LED nanobeacons mounted inside them. A set of data corresponding to 600 hours of livetime was analysed. The results show good agreement with Monte Carlo simulations of the expected optical background and the signal from atmospheric muons. An almost background-free sample of muons was selected by filtering the time correlated signals on all the three optical modules. The zenith angle of the selected muons was reconstructed with a precision of about 3{\\deg}.

  17. United States Department of

    E-Print Network [OSTI]

    Estimated UseofWaterintheUnitedStatesin2005 Trends in estimated water use in the United States.L., Hutson, S.S., Linsey, K.S., Lovelace, J.K., and Maupin, M.A., 2009, Estimated use of water in the United

  18. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Pacific Southwest Forest and Range unit investigating measurement and analysis techniques for management planning, with headquarters in Berkeley, Calif. ELLIOT L. AMIDON is now assigned to the Station's unit at Arcata, Calif., that is studying

  19. United States of Agriculture

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Intermountain Research Station Research Research Station's Riparian-Stream Ecology and Management Research Work Unit at Boise, ID. He re- ceived with the Intermountain Research Station's Riparian-Stream Ecology and Man- agement Research Work Unit at the Forestry

  20. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Northeastern Research Station General Estimates for Forest Types of the United States James E. Smith Linda S. Heath Kenneth E. Skog Richard A forest types within 10 regions of the United States. Separate tables were developed for afforestation

  1. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service General Technical #12;- TH ,a geneticist, is assigned to the Station's research unit dyin etics of western forest trees, with headquarters in Berkeley, Berkeley. PAUL D. cal technician with the genetics research unit, isa forestry gra California, Berkeley

  2. United States Department of

    E-Print Network [OSTI]

    Clements, Craig

    United States Department of Agriculture Forest Service Intermountain Research Station Ogden, UT. He was project leader of the fire fundamentals research work unit from 1966 until 1979 and is currently project leader of the fire behavior research work unit at the fire sciences laboratory. RALPH A

  3. United States Department of

    E-Print Network [OSTI]

    Liebhold, Andrew

    United States Department of Agriculture Forest Service Northeastern Research Station Research Paper of the Eastern United States have been devastated by invasive pests. We used existing data to predict-quarter in total host density. Gypsy moth occupies only 23 percent of its potential range in the Eastern United

  4. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Pacific Southwest Forest and Range Thomas J. Mills Frederick W. Bratten #12;The Authors: are with the Station's research unit studying fire J. MILLS, a forest economist, is in charge of the unit. He earned degrees at Michigan State

  5. United States of Agriculture

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Pacific Southwest Research Station General,000 xylem resin samples of pine (Pinus) species and hybrids--largely from the western United States locations in the eastern and southern United States. Cover Image: Chapter 6, Figure 6-2. #12;Xylem

  6. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Pacific Southwest Forest and Range ecosystemsresearch unit located in Riverside. California. PAUL H. DUNN was project leader at that time and is now project leader of the atmospheric deposition research unit in Riverside. Calif. SUSAN C. BARRO

  7. United States Department of

    E-Print Network [OSTI]

    United States Department of Proceedings of the Agriculture Pacific Southwest Symposium on Social of Agriculture; 96 p. The growing demand for recreation at the wildland-urban interface throughout the United and the Urban Culture Research Unit headquartered at the Forest Fire Laboratory, 4955 Canyon Crest Dr

  8. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Pacific Southwest Research Station http. Arbaugh is a statistician with the Station's Atmospheric Deposition Effects Research Unit at Riverside and associate professor with the National Park Service Cooperative Park Studies Unit, College of Forest

  9. United States Department of

    E-Print Network [OSTI]

    Holberton, Rebecca L.

    United States Department of Agriculture Forest Service Northeastern Research Station General Technical Report NE-318 Atlas of Climate Change Effects in 150 Bird Species of the Eastern United States Service 359 Main Road Delaware, OH 43015 USA #12;United States Department of Agriculture Forest Service

  10. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Northeastern Research Station Research Paper NE-722 James E. Smith Linda S. Heath A Model of Forest Floor Carbon Mass for United States Forest contiguous United States. Manuscript received for publication 22 April 2002 #12;A Model of Forest Floor

  11. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Southern Research Station General Technical United States. In: Rauscher, H. Michael, and Kurt Johnsen, eds. Southern forest science: past, present Trends in the Southern United States Robert A. Mickler, James E. Smith, and Linda S. Heath1 Abstract

  12. UNITED STATES PARTMENT OF

    E-Print Network [OSTI]

    UNITED STATES PARTMENT OF lMMERCE J8l1CATION SEATTLE, WA IOVEMBER 1973 FISHERY FACTS-6 U. S of foreign fishing off United States coastal waters, and the aevelopment and enforce- ment of international;ABSTRACT Dungeness crabs, Cancer magister, occur in the inshore waters of t he west coast of the United

  13. United States Department of

    E-Print Network [OSTI]

    United States Department of Agriculture Forest Service Northeastern Research Station General reported in USDA Forest Service surveys for forests of the conterminous United States. Developed for use estimates are provided for regional tree-mass totals using summary forest statistics for the United States

  14. United States Nuclear Regulatory

    E-Print Network [OSTI]

    United States Nuclear Regulatory Commission United States Department of Energy United States.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: DISTRIBUTION@nrc.gov Facsimile: 301; and Commission papers and their attachments. NRC publications in the NUREG series, NRC regulations, and Title 10

  15. Unit Testing Discussion C

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    Unit Testing Discussion C #12;Unit Test public Method is smallest unit of code Input/output transformation Test if the method does what it claims Not exactly black box testing #12;Test if (actual result Expected Computed Input #12;Functionality Computation ­ Easy to test Time based Asynchronous interaction

  16. The Macroscopic Cortical Unit

    E-Print Network [OSTI]

    Penny, Will

    The Macroscopic Brain Will Penny Cortical Unit Neural Mass Model Cell Populations Differential Will Penny 21st April 2011 #12;The Macroscopic Brain Will Penny Cortical Unit Neural Mass Model Cell as formulated in David et al. (2006). #12;The Macroscopic Brain Will Penny Cortical Unit Neural Mass Model Cell

  17. ANTH 376: GENOMICS & ANTHROPOLOGY 4 credit hours (satisfies an SC requirement)

    E-Print Network [OSTI]

    1 ANTH 376: GENOMICS & ANTHROPOLOGY 4 credit hours (satisfies an SC variation, health and evolution. Extended Course Description The Human Genome Project and recent advances in genome sequencing techniques have made it possible

  18. Analysis of Sub-Hourly Ramping Impacts of Wind Energy and Balancing Area Size (Poster)

    SciTech Connect (OSTI)

    Milligan, M.; Kirby, B.

    2008-06-01

    WindPower 2008 conference sponsored by AWEA held in Houston, TX on June 1-4 2008. This poster illustrates the data collected for an analysis of sub-hourly ramping impacts of wind energy and balancing area size.

  19. Validation of a group 24-hour recall method for dietary assessment 

    E-Print Network [OSTI]

    Scott, Amanda Renee

    2002-01-01

    A group 24-hour recall method developed by the Expanded Food and Nutrition Education Program of Texas was validated in a population of low-income female food service workers using unobtrusive meal observation as a validation standard. All subjects...

  20. Building Technologies Program: Tax Deduction Qualified Software- Hourly Analysis Program (HAP) version 4.50

    Broader source: Energy.gov [DOE]

    Provides required documentation that Hourly Analysis Program (HAP) version 4.50 meets Internal Revenue Code §179D, Notice 2006-52, dated June 2, 2006, for calculating commercial building energy and power cost savings.

  1. Y-12 Construction hits one million-hour mark without a lost-time...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Construction hits one ... Y-12 Construction hits one million-hour mark without a lost-time accident Posted: August 30, 2012 - 5:30pm The B&W Y-12 Direct-Hire Construction team has...

  2. MAST/GEOG 667: Wind Power Meteorology Fall 2013, 3 credit hours

    E-Print Network [OSTI]

    Firestone, Jeremy

    MAST/GEOG 667: Wind Power Meteorology Fall 2013, 3 credit hours 1 to understand onshore, offshore, and airborne wind power. Topics include: forces affecting winds; terrain and land-use effects; air turbulence; numerical modeling; wind power

  3. Department of Physics & Physical Oceanography Faculty Report on Credit-Hour Equivalent (CHE) Overload

    E-Print Network [OSTI]

    Olszewski Jr., Edward A.

    Department of Physics & Physical Oceanography Faculty Report on Credit-Hour Equivalent (CHE and Physical Oceanography can report activities beyond their normal teaching loads. This form will be used

  4. Building Technologies Program: Tax Deduction Qualified Software- Hourly Analysis Program (HAP) version 4.40

    Broader source: Energy.gov [DOE]

    Provides required documentation that Hourly Analysis Program (HAP) version 4.40 meets Internal Revenue Code §179D, Notice 2006-52, dated April 10, 2009, for calculating commercial building energy and power cost savings.

  5. A simple method to downscale daily wind statistics to hourly wind data

    E-Print Network [OSTI]

    Guo, Zhongling

    2013-01-01

    Wind is the principal driver in the wind erosion models. The hourly wind speed data were generally required for precisely wind erosion modeling. In this study, a simple method to generate hourly wind speed data from daily wind statistics (daily average and maximum wind speeds together or daily average wind speed only) was established. A typical windy location with 3285 days (9 years) measured hourly wind speed data were used to validate the downscaling method. The results showed that the overall agreement between observed and simulated cumulative wind speed probability distributions appears excellent, especially for the wind speeds greater than 5 m s-1 range (erosive wind speed). The results further revealed that the values of daily average erosive wind power density (AWPD) calculated from generated wind speeds fit the counterparts computed from measured wind speeds well with high models' efficiency (Nash-Sutcliffe coefficient). So that the hourly wind speed data can be predicted from daily average and maximu...

  6. Building Technologies Program: Tax Deduction Qualified Software- Hourly Analysis Program (HAP) version 4.31

    Broader source: Energy.gov [DOE]

    Provides required documentation that Hourly Analysis Program (HAP) version 4.31 meets Internal Revenue Code §179D, Notice 2006-52, dated June 2, 2006, for calculating commercial building energy and power cost savings.

  7. Building Technologies Program: Tax Deduction Qualified Software- Hourly Analysis Program (HAP) version 4.34

    Broader source: Energy.gov [DOE]

    Provides required documentation that Hourly Analysis Program (HAP) version 4.34 meets Internal Revenue Code §179D, Notice 2006-52, dated June 2, 2006, for calculating commercial building energy and power cost savings.

  8. Reassessing After-Hour Arrival Patterns and Outcomes in ST-Elevation Myocardial Infarction

    E-Print Network [OSTI]

    2015-01-01

    coronary intervention (PCI) facilities in Dallas, Texas,Weekends and after-hour PCI coverage is still associatedtimes of STEMI patients at PCI-capable hospitals on D2B time

  9. Earth Hour 2009: March 28, 8:30-9:30 PM Local Time | Department...

    Broader source: Energy.gov (indexed) [DOE]

    our hand-cranked LED flashlights. Earth Hour is an international event sponsored by the World Wildlife Fund (WWF). This event, which started out in one city, Sydney, Australia, in...

  10. EPA ENERGY STAR Webcast- Portfolio Manager® Office Hours, Focus Topic: Portfolio Manager 2015 Priorities

    Broader source: Energy.gov [DOE]

    Portfolio Manager "Office Hours" is a live webinar that gives all users an opportunity to ask their questions directly to EPA in an open forum. We will plan to spend the first 20-30 minutes of each...

  11. EPA ENERGY STAR Webcast: Portfolio Manager Office Hours, Focus Topic: Responding to a Data Request

    Office of Energy Efficiency and Renewable Energy (EERE)

    Portfolio Manager "Office Hours" is a live webinar that gives all users an opportunity to ask their questions directly to EPA in an open forum. We will plan to spend the first 20-30 minutes of each...

  12. EPA ENERGY STAR Webinar: Portfolio Manager Office Hours, Focus Topic: Understanding Energy Metrics

    Broader source: Energy.gov [DOE]

    Portfolio Manager "Office Hours" is a live webinar that gives all users an opportunity to ask their questions directly to EPA in an open forum. We will plan to spend the first 20-30 minutes of each...

  13. Office Hours

    E-Print Network [OSTI]

    Teresa L Kepner

    2011-06-14

    Math G144. 12:00-. 1:00. David Norris. Math G144. Gabriel Smith. Math B13. David Norris. Math G144. David Norris. Math G144. Gabriel Smith. Math B13. 1:

  14. Museum Hours

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJessework usesof Energy Moving Forward to AddressMcGuire AFB,Museum Day

  15. Computer Code Gives Astrophysicists First Full Simulation of Star's Final Hours

    ScienceCinema (OSTI)

    Andy Nonaka

    2010-01-08

    The precise conditions inside a white dwarf star in the hours leading up to its explosive end as a Type Ia supernova are one of the mysteries confronting astrophysicists studying these massive stellar explosions. But now, a team of researchers, composed of three applied mathematicians at the U.S. Department of Energy's (DOE) Lawrence Berkeley National Laboratory and two astrophysicists, has created the first full-star simulation of the hours preceding the largest thermonuclear explosions in the universe.

  16. Coiled tubing; Operations and services

    SciTech Connect (OSTI)

    Welch, J.L. ); Whitlow, R.R. )

    1992-07-01

    This paper reports that pulling tubing to clean out a production liner at Prudhoe Bay Unit Western Operating Area (PBU WOA) averages $600,000 to $800,000. Coiled tubing underreaming was developed to accomplish this objective at lower costs. Beginning in 1988, these operations have been improved through several generations of procedures and tool designs. Using current technology, the underreamer, in conjunction with coiled tubing, can reduce the cost of drilling out to a liner to about $50,000 or $100,000, depending on the amount and type of material to be removed. PBU WOA, operated by BP Exploration, produces about 600,000 bopd from 395 wells. Another 61 wells are used to inject produced water, seawater and miscible fluids. Most of the remedial well servicing operations are conducted using coiled tubing (CT). Three contract coiled tubing units (CTUs) work daily, performing wellbore cleanouts, stimulations, inflatable bridge plug installations and cement squeeze operations. About 42 underreaming jobs were performed from 1990 to 1991 at PBU WOA for an average cost of between $75,000 and $100,000, a cost savings of $500,000 power well compared to pulling tubing and cleaning out the wells conventionally.

  17. Unit 51 - GIS Application Areas

    E-Print Network [OSTI]

    Unit 51, CC in GIS; Cowen, David; Ferguson, Warren

    1990-01-01

    51 - GIS APPLICATION AREAS UNIT 51 - GIS APPLICATION AREAS1990 Page 1 Unit 51 - GIS Application Areas Computers inyour students. UNIT 51 - GIS APPLICATION AREAS Compiled with

  18. Texas Tech University offers specialized advising for the first 45 degree hours in 10 pre-professional health tracks (PPHC). Upon reaching 45 hours, Arts and Sciences students must declare an undergraduate major before registering for additional classes.

    E-Print Network [OSTI]

    Rock, Chris

    Texas Tech University offers specialized advising for the first 45 degree hours in 10 pre students to declare a major two semesters after accumulating 45 degree hours. Each health program has

  19. Job Safety Analysis College/Department/Unit

    E-Print Network [OSTI]

    Saskatchewan, University of

    Job Safety Analysis (JSA) College/Department/Unit: Title of Job Activity: Hydraulic Press Location and Measurement: Date of Original JSA: JSA #: JSA Approved by: Date: #12;JSA # Page 2 Review Frequency: Yearly Measures Position item in proper location and secure Damage to equipment or operator Use proper jig

  20. UNITED STATES ATOMIC ENERGY COMMISSION CHICAGO OPERATIONS OFFICE

    Office of Legacy Management (LM)

    samples showed elevated count rates. It is concluded that this was probably a counting system anomaly and not due to the presence of Co-60. Coils and cooling tubes from the...

  1. STOCHASTIC FLOW SEQUENCE GENERATION AND ASPINALL UNIT OPERATIONS

    E-Print Network [OSTI]

    traces which are eventually used as inputs to a Decision Support System (DSS) model of the Gunnison Basin flows throughout the basin at a monthly timestep. Last, a DSS model is developed and employed not have been possible without the help of many individuals. First, I would like to thank my advisor, Dr

  2. Simplified programming and control of automated radiosynthesizers through unit operations

    E-Print Network [OSTI]

    Claggett, SB; Quinn, KM; Lazari, M; Moore, MD; van Dam, RM

    2013-01-01

    et al. : Simplified programming and control of automatedRM: A new paradigm for programming and controlling automatedOpen Access Simplified programming and control of automated

  3. Letter: Quarry Residuals Operable Unit (QROU), Record of Decision (ROD).

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and MyersHr. Anthony V. Andolina:I 1 '\ LI g.3LTSI9

  4. Meeting Summary and Memo: Quarry Residuals Operable Unit Regulators Meeting.

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and MyersHr. Anthony V. Andolina:I.)p'J52. APR'3

  5. Monticello Mill Tailings Site Operable Unit III Annual Groundwater Report

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReport for the Weldon Spring, Missouri,MSEReportyGWSHP 1.83 Through

  6. Monticello Mill Tailings Site Operable Unit III Ecological Risk

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReport for the Weldon Spring, Missouri,MSEReportyGWSHP 1.83

  7. Monticello Mill Tailings Site Operable Unit Ill Interim Remedial Action

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReport for the Weldon Spring, Missouri,MSEReportyGWSHP 1.83Site

  8. UNITED STATES ATOMIC ENERGY COMMISSION CHICAGO OPERATIONS OFFICE

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and700, 1. .&. ' , c 1afr a . - 3=A-;

  9. UNITED STATES ATOMIC ENERGY COMMISSION Iew York Operation8 Office

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and700, 1. .&. ' , c 1afr a . - 3=A-;fi ' J/ui :

  10. UNITED STATES ATOMIC ENERGY COMMISSION OAK RIDGE OPERATIONS

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and700, 1. .&. ' , c 1afr a . - 3=A-;fi ' J/ui

  11. UNITED STATES ENERGY RESEARCH AND DEVELOPMENT CHICAGO OPERATIONS OFFICE

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and700, 1. .&. ' , c 1afr a . - 3=A-;fi.BJ' 1-7

  12. Exhibit A: ENSR Modeling in Support of Individual Unit Operation |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPLfor InnovativeProcessing22,673, proposed FederalEnergy

  13. Exhibit A: Modeling in Support of Two Unit Operating Configurations |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPLfor InnovativeProcessing22,673, proposed FederalEnergyDepartment of

  14. Exhibit D: Mirant Potomac River Schedule of Unit Operations: January -

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPLfor InnovativeProcessing22,673, proposed

  15. UNITED STATES ATOMIC ENERGY COMMISSION CHICAGO OPERATIONS OFFICE

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReport for the WeldonB100 Ambrosia'1(DOE)F. a%UCRL-53628 . .

  16. Incorporating operational flexibility into electric generation planning : impacts and methods for system design and policy analysis

    E-Print Network [OSTI]

    Palmintier, Bryan S. (Bryan Stephen)

    2013-01-01

    This dissertation demonstrates how flexibility in hourly electricity operations can impact long-term planning and analysis for future power systems, particularly those with substantial variable renewables (e.g., wind) or ...

  17. Performance of VAV Fan Powered Terminal Units: Experimental Results and Models for Parallel Units 

    E-Print Network [OSTI]

    Furr, J.; O'Neal, D.; Davis, M.; Bryant, J.; Cramlet, A.

    2008-01-01

    Empirical models of airflow output, power consumption, and primary airflow were developed for parallel fan powered variable air volume terminal units at typical operating pres- sures. Both 8 in. (203 mm) and 12 in. (304 mm) primary air inlet terminal units... from three manufacturers were evaluated. Generalized models were developed from the experimental data with coefficients varying by size and manufacturer. Fan power and airflow data were collected at down- stream static pressures over a range from 0...

  18. Performance of VAV Fan Powered Terminal Units: Experimental Results and Models for Series Units 

    E-Print Network [OSTI]

    Furr, J.; O'Neal, D.; Davis, M.; Bryant, J.; Cramlet, A.

    2008-01-01

    Empirical models of airflow output and power consump- tion were developed for series fan powered variable air volume terminal units at typical operating pressures. Terminal units with 8 in. (203 mm) and 12 in. (304 mm) primary air inlets from three different... manufacturers were evaluated. Generalized models were developed from the experimental data with coef- ficients varying by size and manufacturer. Fan power and airflow data were collected at downstream static pressures of 0.25 w.g. (63 Pa). Upstream static...

  19. High temperature solid oxide fuel cell: Customer test units

    SciTech Connect (OSTI)

    Ray, E.R.; Veyo, S.E.

    1993-11-01

    There are three 25-kW class SOFC customer test unit programs; two are in Japan (utility joint ventures), one for Southern California Edison Co. The two in Japan are described: Startup, testing, modifications, and operational performance are discussed.

  20. Strategies for decommoditizing and internationalizing a prepaid business unit

    E-Print Network [OSTI]

    Cavalcanti Machado, Luis Filipe (Luis Filipe Dionisio)

    2011-01-01

    This thesis aims to establish a new strategy for a Brazilian IT service company to leverage the operation of its prepaid business unit in Brazil and overseas. The work starts using the Delta Model to segment the customers, ...