Powered by Deep Web Technologies
Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Form EIA-930 HOURLY AND DAILY BALANCING AUTHORITY OPERATIONS REPORT  

U.S. Energy Information Administration (EIA) Indexed Site

930 930 HOURLY AND DAILY BALANCING AUTHORITY OPERATIONS REPORT INSTRUCTIONS Due Date: mm/dd/yyyy Approved: OMB No. 1905-0129 Approval Expires: 10/31/2016 Burden: 0.19 hours Page 1 Draft for Discussion only PURPOSE Form EIA-930 requires Internet posting of hourly balancing authority operating data. The posted data are used to monitor the current status and trends of the electric power industry, and to support enhancement of electric system operations. REQUIRED RESPONDENTS For the contiguous United States: all entities that are listed in NERC's Compliance Registry as a balancing authority must post balancing authority operating information required by this survey. Other than the Midwest ISO (MISO), registered balancing authorities that are parties

2

BNL | Center for Functional Nanomaterials Hours of Operation  

NLE Websites -- All DOE Office Websites (Extended Search)

CFN Hours of Operation CFN Hours of Operation Normal working hours at the CFN are 8 a.m. to 6 p.m. Working Outside of Normal Hours CFN scientific and technical personnel, as well as external users, may need to work outside of normal operating hours, during which time support is limited and many colleagues may not be around. Therefore, working outside the 8 a.m. to 6 p.m. envelope on weekdays, or anytime on weekends and holidays, requires special precautions, especially if working in a laboratory. CFN users are expected to work at the CFN during normal working hours. Users with extensive experience working at the CFN may be granted permission by the appropriate facility leader and ES&H Coordinator to work after hours. Users first must complete the Request to Work After-Hours at

3

Hourly Energy Emission Factors for Electricity Generation in the United  

Open Energy Info (EERE)

Hourly Energy Emission Factors for Electricity Generation in the United Hourly Energy Emission Factors for Electricity Generation in the United States Dataset Summary Description Emissions from energy use in buildings are usually estimated on an annual basis using annual average multipliers. Using annual numbers provides a reasonable estimation of emissions, but it provides no indication of the temporal nature of the emissions. Therefore, there is no way of understanding the impact on emissions from load shifting and peak shaving technologies such as thermal energy storage, on-site renewable energy, and demand control. This project utilized GridViewTM, an electric grid dispatch software package, to estimate hourly emission factors for all of the eGRID subregions in the continental United States. These factors took into account electricity imports and exports

4

Seasonal Variations in the Diurnal Characteristics of Heavy Hourly precipitation across the United States  

Science Conference Proceedings (OSTI)

Hourly precipitation data from 1967 to 1983 for the coterminous, United States were harmonically analyzed in order to document the diurnal variability of several categories of heavy hourly precipitation during winter, spring, summer, and autumn. ...

Julie A. Winkler; Brent R. Skeeter; Paul D. Yamamoto

1988-08-01T23:59:59.000Z

5

Identifying Challenging Operating Hours for Solar Intergration in the NV Energy System  

Science Conference Proceedings (OSTI)

Abstract-- In this paper, the ability of the Nevada (NV) Energy generation fleet to meet its system balancing requirements under different solar energy penetration scenarios is studied. System balancing requirements include capacity, ramp rate, and ramp duration requirements for load following and regulation. If, during some operating hours, system capability is insufficient to meet these requirements, there is certain probability that the balancing authority’s control and reliability performance can be compromised. These operating hours are considered as “challenging” hours. Five different solar energy integration scenarios have been studied. Simulations have shown that the NV Energy system will be potentially able to accommodate up to 942 MW of solar photovoltaic (PV) generation. However, the existing generation scheduling procedure should be adjusted to make it happen. Fast-responsive peaker units need to be used more frequently to meet the increasing ramping requirements. Thus, the NV Energy system operational cost can increase. Index Terms—Solar Generation, Renewables Integration, Balancing Process, Load Following, Regulation.

Etingov, Pavel V.; Lu, Shuai; Guo, Xinxin; Ma, Jian; Makarov, Yuri V.; Chadliev, Vladimir; Salgo, Richard

2012-05-09T23:59:59.000Z

6

For the B-Area Operable Unit  

NLE Websites -- All DOE Office Websites (Extended Search)

3 April 16, 2013 Notice of Availability Record of Decision For the B-Area Operable Unit The Record of Decision (ROD) Remedial Alternative Selection for the B-Area Operable Unit...

7

Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load for 12 hours Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load for 12 hours Docket No. EO-05-01. Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load for 12 hours. Arial photograph showing plant and location of predicted SO2 violations, predicted in 2000. Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load for 12 hours More Documents & Publications Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Units 3, 1, 2 SO2 Case Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Units 4, 1, 2 SO2 Case Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by

8

Optimizing hourly hydro operations at the Salt Lake City Area integrated projects  

DOE Green Energy (OSTI)

The Salt Lake City Area (SLCA) office of the Western Area Power Administration (Western) is responsible for marketing the capacity and energy generated by the Colorado Storage, Collbran, and Rio Grande hydropower projects. These federal resources are collectively called the Salt Lake City Area Integrated Projects (SLCA/IP). In recent years, stringent operational limitations have been placed on several of these hydropower plants including the Glen Canyon Dam, which accounts for approximately 80% of the SLCA/IP resources. Operational limitations on SLCA/IP hydropower plants continue to evolve as a result of decisions currently being made in the Glen Canyon Dam Environmental Impact Statement (EIS) and the Power Marketing EIS. To analyze a broad range of issues associated with many possible future operational restrictions, Argonne National Laboratory (ANL), with technical assistance from Western has developed the Hydro LP (Linear Program) Model. This model simulates hourly operations at SLCA/IP hydropower plants for weekly periods with the objective of maximizing Western`s net revenues. The model considers hydropower operations for the purpose of serving SLCA firm loads, loads for special projects, Inland Power Pool (IPP) spinning reserve requirements, and Western`s purchasing programs. The model estimates hourly SLCA/IP generation and spot market activities. For this paper, hourly SLCA/IP hydropower plant generation is simulated under three operational scenarios and three hydropower conditions. For each scenario an estimate of Western`s net revenue is computed.

Veselka, T.D.; Hamilton, S. [Argonne National Lab., IL (United States); McCoy, J. [Western Area Power Administration, Salt Lake City, UT (United States)

1995-06-01T23:59:59.000Z

9

Daily/Hourly Hydrosystem Operation : How the Columbia River System Responds to Short-Term Needs.  

SciTech Connect

The System Operation Review, being conducted by the Bonneville Power Administration, the US Army Corps of Engineers, and the US Bureau of Reclamation, is analyzing current and potential future operations of the Columbia River System. One goal of the System Operations Review is to develop a new System Operation Strategy. The strategy will be designed to balance the many regionally and nationally important uses of the Columbia River system. Short-term operations address the dynamics that affect the Northwest hydro system and its multiple uses. Demands for electrical power and natural streamflows change constantly and thus are not precisely predictable. Other uses of the hydro system have constantly changing needs, too, many of which can interfere with other uses. Project operators must address various river needs, physical limitations, weather, and streamflow conditions while maintaining the stability of the electric system and keeping your lights on. It takes staffing around the clock to manage the hour-to-hour changes that occur and the challenges that face project operators all the time.

Columbia River System Operation Review (U.S.)

1994-02-01T23:59:59.000Z

10

A 25-yr Climatology of Large-Amplitude Hourly Surface Pressure Changes over the Conterminous United States  

Science Conference Proceedings (OSTI)

Hourly surface pressure observations for a 25-yr period (1949–63; 1984–93) for the conterminous United States have been used to map the distribution of large hourly pressure changes defined as falls or rises in excess of 4.25 hPa. Initially, 8431 ...

Lorna L. Koppel; Lance F. Bosart; Daniel Keyser

2000-01-01T23:59:59.000Z

11

EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

195: Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental Management...

12

Spatial and Temporal Characteristics of Heavy Hourly Rainfall in the United States  

Science Conference Proceedings (OSTI)

The climatology of heavy rain events from hourly precipitation observations by Brooks and Stensrud is revisited in this study using two high-resolution precipitation datasets that incorporate both gauge observations and radar estimates. Analyses ...

Nathan M. Hitchens; Harold E. Brooks; Russ S. Schumacher

2013-12-01T23:59:59.000Z

13

Wind Power Plants and System Operation in the Hourly Time Domain: Preprint  

DOE Green Energy (OSTI)

Because wind is an intermittent power source, the variability may have significant impacts on system operation. Part of the difficulty of analyzing the load following impact of wind is the inadequacy of most modeling frameworks to accurately treat wind plants and the difficulty of untangling causal impacts of wind plants from other dynamic phenomena. This paper presents a simple analysis of an hourly load-following requirement that can be performed without extensive computer modeling. The approach is therefore useful as a first step to quantifying these impacts when extensive modeling and data sets are not available. The variability that wind plants add to the electricity supply must be analyzed in the context of overall system variability. The approach used in this paper does just that. The results show that wind plants do have an impact on load following, but when calculated as a percentage of the installed wind plant capacity, this impact is not large. Another issue is the extent to which wind forecast errors add to imbalance. The relative statistical independence of wind forecast errors and load forecast errors can be used to help quantify the extent to which wind forecast errors impact overall system imbalances.

Milligan, M.

2003-05-01T23:59:59.000Z

14

Climatology of Heavy Rain Events in the United States from Hourly Precipitation Observations  

Science Conference Proceedings (OSTI)

Flash flooding is frequently associated with heavy precipitation (defined here as ?1 in. h?1) occurring over a short period of time. To begin a study of flash flood–producing rain events, the Hourly Precipitation Dataset (HPD) is used to develop ...

Harold E. Brooks; David J. Stensrud

2000-04-01T23:59:59.000Z

15

Sub-Hourly Impacts of High Solar Penetrations in the Western United States: Preprint  

DOE Green Energy (OSTI)

This paper presents results of analysis on the sub-hourly impacts of high solar penetrations from the Western Wind and Solar Integration Study Phase 2. Extreme event analysis showed that most large ramps were due to sunrise and sunset events, which have a significant predictability component. Variability in general was much higher in the high-solar versus high-wind scenario. Reserve methodologies that had already been developed for wind were therefore modified to take into account the predictability component of solar variability.

Lew, D.; Brinkman, G.; Ibanez, E.; Hummon, M.; Hodge, B. M.; Heaney, M.; King, J.

2012-09-01T23:59:59.000Z

16

Impact of High Wind Power Penetration on Hydroelectric Unit Operations  

SciTech Connect

The Western Wind and Solar Integration Study (WWSIS) investigated the operational impacts of very high levels of variable generation penetration rates (up to 35% by energy) in the western United States. This work examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators. The cost impacts of maintaining hydro unit flexibility are assessed and compared for a number of different modes of system operation.

Hodge, B. M.; Lew, D.; Milligan, M.

2011-01-01T23:59:59.000Z

17

Exhibit D: Mirant Potomac River Schedule of Unit Operations:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: January - March 2006 Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit...

18

Monticello Mill Tailings, Operable Unit III Surface and Ground...  

Office of Legacy Management (LM)

Action activities included millsite dewatering and treatment, initiation of a ground water management policy to prevent use Monticello Mill Tailings Site, Operable Unit III...

19

UNITED STATES ATOMIC ENERGY COMMISSION NEVADA OPERATIONS OFFICE  

Office of Legacy Management (LM)

UNITED STATES ATOMIC ENERGY COMMISSION NEVADA OPERATIONS OFFICE . MASTER .r NVO-152 DECEMBER 1974 Las Vegas, Nevada i, SUMMARY RIEPORT , . I ' i (ENTALNEVADTESTAREA...

20

EA-0821: Operation of the Glass Melter Thermal Treatment Unit...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Operation of the Glass Melter Thermal Treatment Unit at the U.S. Department of Energy's Mound Plant, Miamisburg, Ohio EA-0821: Operation of the Glass Melter Thermal Treatment...

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Exhibit A: Modeling in Support of Two Unit Operating Configurations |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Modeling in Support of Two Unit Operating Configurations Modeling in Support of Two Unit Operating Configurations Exhibit A: Modeling in Support of Two Unit Operating Configurations Docket No. EO-05-01: Tables showing modeling of emissions from units of the Mirant Potomac Power Plant. Exhibit A: Modeling in Support of Two Unit Operating Configurations More Documents & Publications Comments on Emergency Order to Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA from the Chesapeake Climate Action Network. Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Answer of Potomac Electric Power Company and PJM lnterconnection, L.L.C. to the October 6, 2005 motion filed by the Virginia Department of

22

Operable Generating Units in the United States by State and Energy...  

U.S. Energy Information Administration (EIA) Indexed Site

Operable Generating Units in the United States by State and Energy Source, 2011" "Note: Descriptions of field names and codes can be obtained from the record layout in the Form...

23

Reservoir release patterns for hydropower operations at the Aspinall Unit on the Gunnison River, Colorado  

DOE Green Energy (OSTI)

This report presents the development of reservoir release patterns for the Aspinall Unit, which includes Blue Mesa, Morrow Point, and Crystal Reservoirs on the Gunnison River in Colorado. Release patterns were assessed for two hydropower operational scenarios--seasonally adjusted steady flows and seasonally adjusted high fluctuating flows--and three representative hydrologic years--moderate (1987), dry (1989), and wet (1983). The release patterns for the operational scenarios were developed with the aid of monthly, daily, and hourly reservoir operational models, which simulate the linked operation of the three Aspinall Unit reservoirs. Also presented are reservoir fluctuations and downstream water surface elevations corresponding to the reservoir release patterns. Both of the hydropower operational scenarios evaluated are based on the ecological research flows proposed by the US Fish and Wildlife Service for the Aspinall Unit. The first operational scenario allows only seasonally adjusted steady flows (no hourly fluctuations at any dam within one day), whereas the second scenario permits high fluctuating flows from Blue Mesa and Morrow Point Reservoirs during certain times of the year. Crystal Reservoir would release a steady flow within each day under both operational scenarios.

Yin, S.C.L. [Argonne National Lab., IL (United States). Environmental Assessment Div.; McCoy, J.J. [Western Area Power Administration, Salt Lake City, UT (United States); Sedlacek, J. [PLM Technologies, Evergreen, CO (United States)

1995-05-01T23:59:59.000Z

24

Unit costs of waste management operations  

SciTech Connect

This report provides estimates of generic costs for the management, disposal, and surveillance of various waste types, from the time they are generated to the end of their institutional control. Costs include monitoring and surveillance costs required after waste disposal. Available data on costs for the treatment, storage, disposal, and transportation of spent nuclear fuel and high-level radioactive, low-level radioactive, transuranic radioactive, hazardous, mixed (low-level radioactive plus hazardous), and sanitary wastes are presented. The costs cover all major elements that contribute to the total system life-cycle (i.e., ``cradle to grave``) cost for each waste type. This total cost is the sum of fixed and variable cost components. Variable costs are affected by operating rates and throughput capacities and vary in direct proportion to changes in the level of activity. Fixed costs remain constant regardless of changes in the amount of waste, operating rates, or throughput capacities. Key factors that influence cost, such as the size and throughput capacity of facilities, are identified. In many cases, ranges of values for the key variables are presented. For some waste types, the planned or estimated costs for storage and disposal, projected to the year 2000, are presented as graphics.

Kisieleski, W.E.; Folga, S.M.; Gillette, J.L.; Buehring, W.A.

1994-04-01T23:59:59.000Z

25

Operational Soil Moisture Estimation for the Midwestern United States  

Science Conference Proceedings (OSTI)

An operational soil moisture monitoring capability for the midwestern United States is developed using a multilayer soil water balance model which incorporates daily weather data to calculate precipitation, soil evaporation, plant transpiration, ...

Kenneth E. Kunkel

1990-11-01T23:59:59.000Z

26

Exhibit D: Mirant Potomac River Schedule of Unit Operations:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 4, January - March 2006 Docket No. EO-05-01: Exhibit D: Mirant Potomac River...

27

Exhibit D: Mirant Potomac River Schedule of Unit Operations:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement 3, January and February 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 3, January and February 2006 Docket No. EO-05-01: Exhibit D: Mirant...

28

Economical operation of thermal generating units integrated with smart houses  

Science Conference Proceedings (OSTI)

This paper presents an economic optimal operation strategy for thermal power generation units integrated with smart houses. With the increased competition in retail and power sector reasoned by the deregulation and liberalization of power market make ... Keywords: particle swarm optimization, renewable energy sources, smart grid, smart house, thermal unit commitment

Shantanu Chakraborty; Takayuki Ito; Tomonobu Senjyu

2012-09-01T23:59:59.000Z

29

Attachment A: Modeling in Support of Additional Two-Unit Operating...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Attachment A: Modeling in Support of Additional Two-Unit Operating Configurations Attachment A: Modeling in Support of Additional Two-Unit Operating Configurations Docket No....

30

Monticello Mill Tailings Site Operable Unit Ill Interim Remedial Action  

Office of Legacy Management (LM)

Site Site Operable Unit Ill Interim Remedial Action Mark Perfxmed Under DOE Contrici No. DE-AC13-96CJ873.35 for th3 U.S. De[:ar!menf of Energy app~oveJioi'ptiL#ic re1ease;dCinWlionis Unlimilra' This page intentionally left blank Monticello Mill Tailings Site Operable Unit I11 Interim Remedial Action Annual Status Report August 1999 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number MSG-035-0011-00-000 Document Number Q0017700 Work Performed Under DOE Contract Number DE-AC13-96GJ87335 Task Order Number MAC99-03 This page intentionally blank Document Number Q0017700 Acronyms Contents Page ACRONYMS .............................................................................................................................. V

31

Impact of High Wind Power Penetration on Hydroelectric Unit Operations: Preprint  

DOE Green Energy (OSTI)

This paper examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators.

Hodge, B. M.; Lew, D.; Milligan, M.

2011-10-01T23:59:59.000Z

32

Method and apparatus for operating an improved thermocline storage unit  

DOE Patents (OSTI)

A method and apparatus for operating a thermocline storage unit in which an insulated barrier member is provided substantially at the interface region between the hot and cold liquids in the storage tank. The barrier member physically and thermally separates the hot and cold liquids substantially preventing any diffusing or mixing between them and substantially preventing any heat transfer there between. The barrier member follows the rise and fall of the interface region between the liquids as the tank is charged and discharged. Two methods of maintaining it in the interface region are disclosed. With the structure and operation of the present invention and in particular the significant reduction in diffusing or mixing between the hot and cold liquids as well as the significant reduction in the thermal heat transfer between them, the performance of the storage tank is improved. More specifically, the stability of the interface region or thermocline is enhanced and the thickness of the thermocline is reduced producing a corresponding increase in the steepness of the temperature gradient across the thermocline and a more efficiently operating thermocline storage unit.

Copeland, R.J.

1982-09-30T23:59:59.000Z

33

Method and apparatus for operating an improved thermocline storage unit  

DOE Patents (OSTI)

A method and apparatus for operating a thermocline storage unit in which an insulated barrier member is provided substantially at the interface region between the hot and cold liquids in the storage tank. The barrier member physically and thermally separates the hot and cold liquids substantially preventing any diffusing or mixing between them and substantially preventing any heat transfer therebetween. The barrier member follows the rise and fall of the interface region between the liquids as the tank is charged and discharged. Two methods of maintaining it in the interface region are disclosed. With the structure and operation of the present invention and in particular the significant reduction in diffusing or mixing between the hot and cold liquids as well as the significant reduction in the thermal heat transfer between them, the performance of the storage tank is improved. More specifically, the stability of the interface region or thermocline is enhanced and the thickness of the thermocline is reduced producing a corresponding increase in the steepness of the temperature gradient across the thermocline and a more efficiently operating thermocline storage unit.

Copeland, Robert J. (Lakewood, CO)

1985-01-01T23:59:59.000Z

34

Operating high temperature (1000/sup 0/C) electrolysis demonstration unit  

SciTech Connect

Phase I of the BNL Fusion Synfuel Demonstration Program has been the successful construction and demonstration of a 100-W electrically-heated, high-temperature electrolysis unit operating at a temperature of 1000/sup 0/C. The high-temperature electrolyzer demonstration unit consists of 34 yttria-stabilized zirconia tubes contained in a 15-cm (od), 30-cm long INCONEL pressure vessel. The tubes are 25-cm long (active length), 0.64-cm (od), and coated on the inside with platinum to form the oxygen electrode and coated on the outside with nickel to form the hydrogen electrode. The 1000/sup 0/C steam is raised by electrically heating water. The system is designed to produce approx. 6 cc/s of hydrogen.

Horn, F.L.; Powell, J.R.; Fillo, J.A.

1981-01-01T23:59:59.000Z

35

Feasibility Study for Operable Unit 7-13/14  

SciTech Connect

The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision.

K. Jean Holdren

2007-05-29T23:59:59.000Z

36

UNITED STATES ATOMIC ENERGY COMMISSION CHICAGO OPERATIONS OFFICE  

Office of Legacy Management (LM)

$$ ,_, . $$ ,_, . UNITED STATES ATOMIC ENERGY COMMISSION CHICAGO OPERATIONS OFFICE TELEPHONE 9600 SOUTH CASS AVENUE (312) 739-7711 ARCONNE. ILLINOIS 60439 ^,/" _. i ' > ;.:a c. JAN 17 1975 Martin B. Biles, Director Division of Operational Safety, HQ _ DISPOSAL OF SCRAP COPPER, CYCLOTRON DISMANTLING PROJECT, NUCLEAR RESEARCH CENTER, CARNEGIE-MELLON UNIVERSITY (CMU) Enclosed for your information is a copy of the October 28, 1974, letter from T. Morris (CMD) to J. Krupa (CH) with pages 1-4 and 8-16 of its attachment (the October 23, 1974, F. Bomba to T. Morris, memo- randum; pages 5-7 are economically omitted as they were not relevant to the subject of this letter) regarding disposal of 4 to 6 tons of copper. The enclosure contains a summary of data obtained from

37

Electric vehicle fleet operations in the United States  

DOE Green Energy (OSTI)

The United States Department of Energy (DOE) is actively supporting the development and commercialization of advanced electric vehicles, and advanced batteries and propulsion systems. As part of this effort, the DOE Field Operations Program is performing commercial validation of electric vehicles. These efforts have included on-board data acquisition of electric vehicle operations and baseline performance testing. The baseline performance tests focus on parameters such as range, acceleration, and battery charging. This testing, performed in conjunction with EV America, has included the baseline performance testing of 14 electric vehicles will also be baseline performance tested. The baseline performance testing has documented annual improvements in performance. This and additional information is made available to the public via the internet homepage (http://ev.inel.gov). The Field Operations Program continues to support the development of electric vehicles and infrastructure in conjunction with its new qualified vehicle test partners: Electric Transportation Application of Phoenix, and Southern California Edison. The Field Operations Program is managed by the Lockheed Martin Idaho Technologies Company, at the Idaho National Engineering Laboratory. 4 refs., 5 figs., 2 tabs.

Francfort, J.E. [Idaho National Engineering and Environmental Lab., Idaho Falls, ID (United States); O`Hara, D. [Dept. of Energy, Washington, DC (United States)

1997-10-01T23:59:59.000Z

38

Monticello Mill Tailings Site Operable Unit III Ecological Risk  

Office of Legacy Management (LM)

Monticello Monticello Mill Tailings Site Operable Unit III Ecological Risk Assessment September 1998 Prepared by U.S. Department of Energy Grand JunctionOffice Grand Junction, Colorado Project Number MSG-035-0004-00-000 Document Number Q0002l 00 Work Performed Under DOE Contract Number DE-AC13-96GJ87335 Task Order Number MAC98-03 This page intentionally blank , ** 1 ( ( Document Number Q00021 00 Contents Contents Page Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. ix Executive Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. xi 1.0 Introduction I-I 2.0 Problem Formulation : 2-1 2.1 Site Description 2-1 2.1.1 Physical Setting 2-1 2.1.2 Ecological Setting '.' 2-5 2.2 Ecological Contaminants of Concern 2-9 2.3 Contaminant Fate and Transport, Ecosystems Potentially at Risk, and Complete Exposure Pathways 2-11 i3.1

39

UNITED STATES ATOMIC ENERGY COMMISSION Iew York Operation8 Office  

Office of Legacy Management (LM)

fi ' fi ' J/ui : ,I/ /J ii%/~it~ - ,,(,C, \,\J,iT/~l \ 11, ?' UNITED STATES ATOMIC ENERGY COMMISSION Iew York Operation8 Office Files (.Thrur V.L.Parsegian, Director, Division of Technical Advisers) Decenber 19, 1950 9; G.Strc&e, Division of Technical Advisers COLD-DRAWING OF TJRAXItZI RODS A BXIDGEPORT BRATS CO'Ei+A!R Symbol: TAtFGSrmam On 12/11/50, an exper%mnt was conducted at the Bridgmort Brass Company in whioh an attanpt m m made to cold-draw hot-foiled rods of uranium tich had been pickled to remove the oxi:!e coating. In addition, a few mpickled bars were drawn. It can be uoncluded from this erperimmt that we x-me unable tith the lubricants used to draw the pickled rods of uranium. This' appears to verify the necessity for an oxide film on the uranium to

40

UNITED STATES ATOMIC ENERGY COMMISSION OAK RIDGE OPERATIONS  

Office of Legacy Management (LM)

AL, 3 AL, 3 UNITED STATES ATOMIC ENERGY COMMISSION OAK RIDGE OPERATIONS CINCINNATI AREA P. 0. BOX 39198, CINCINNATI 39, OHIO IN REPLY REFER TO: 0:OJT --r.LAal Cl E:c Mr. J. H. Noyes, Plant Manager National Lead Company of Ohio P. 0. Box 39158 Cincinnati 39, Ohio Subject: HOT TENSILE TESTS OF URANIUM - SOUTHERN RESEARCH INSTITUTE Dear Mr. Noyee: I / Reference is made to your letter of May 17, 1962, on the above subject. Approval is granted for the off-site movement of up to 300 pounds of normal uranium by the National Lead Company of Ohio to the Southern Research Institute, Birmingham, Alabama for testing purposes. Accountability for the material should be retained in SS Station NLO's records during the testing period. The Monthly Material Balance Re-

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Impact of High Wind Power Penetration on Hydroelectric Unit Operations in the WWSIS  

DOE Green Energy (OSTI)

This report examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating patterns are examined both for an aggregation of all hydro generators and for select individual plants.

Hodge, B.-M.; Lew, D.; Milligan, M.

2011-07-01T23:59:59.000Z

42

Potential for supplying solar thermal energy to industrial unit operations  

DOE Green Energy (OSTI)

Previous studies have identified major industries deemed most appropriate for the near-term adoption of solar thermal technology to provide process heat; these studies have been based on surveys that followed standard industrial classifications. This paper presents an alternate, perhaps simpler analysis of this potential, considered in terms of the end-use of energy delivered to industrial unit operations. For example, materials, such as animal feed, can be air dried at much lower temperatures than are currently used. This situation is likely to continue while economic supplies of natural gas are readily available. However, restriction of these supplies could lead to the use of low-temperature processes, which are more easily integrated with solar thermal technology. The adoption of solar technology is also favored by other changes, such as the relative rates of increase of the costs of electricity and natural gas, and by energy conservation measures. Thus, the use of low-pressure steam to provide process heat could be replaced economically with high-temperature hot water systems, which are more compatible with solar technology. On the other hand, for certain operations such as high-temperature catalytic and distillation processes employed in petroleum refining, there is no ready alternative to presently employed fluid fuels.

May, E.K.

1980-04-01T23:59:59.000Z

43

Operational Weather Radar in the United States: Progress and Opportunity  

Science Conference Proceedings (OSTI)

The NEXRAD operational system consisting of a network of WSR—88D radars is now operational within the 50 states, as well as Puerto Rico and Guam. This technology has been enthusiastically received by weather forecasters in all regions and ...

Robert J. Serafin; James W. Wilson

2000-03-01T23:59:59.000Z

44

INDEPENDENT VERIFICATION SURVEY REPORT OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT  

Science Conference Proceedings (OSTI)

INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT, MIAMISBURG, OHIO DCN: 0468-SR-03-0

W.C. Adams

2010-07-21T23:59:59.000Z

45

EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the potential environmental impacts of a proposal to conduct remedial action at Operable Unit 4 at the Fernald Environmental Management Project.

46

Economic Assessment of Electric-Drive Vehicle Operation in California and the United States  

E-Print Network (OSTI)

electricity rates in California and across the United States (STATES ABSTRACT This study examines the relative economics of electric vehicle operation in the context of current electricity rates

Lidicker, Jeffrey R.; Lipman, Timothy E.; Shaheen, Susan A.

2010-01-01T23:59:59.000Z

47

INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT  

SciTech Connect

INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT, MIAMISBURG, OHIO DCN: 0468-SR-02-0

W.C. Adams

2010-05-24T23:59:59.000Z

48

An Innovative Method for Dynamic Characterization of Fan Filter Unit Operation.  

E-Print Network (OSTI)

transformer, and additional accessories attached to the unit. 6.5 Ambient conditionstransformer when applicable. Total electric power demand can be measured and characterized for any operable condition -

Xu, Tengfang

2006-01-01T23:59:59.000Z

49

Handbook of solar energy data for south-facing surfaces in the United States. Volume II. Average hourly and total daily insolation data for 235 localities (Alaska - Montana)  

DOE Green Energy (OSTI)

Average hourly and daily total insolaion estimates are given for 235 US sites at a variety of array tilt angles. (MHR)

Smith, J.H.

1980-01-15T23:59:59.000Z

50

Exhibit A: ENSR Modeling in Support of Individual Unit Operation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Exhibit D: Mirant Potomac River...

51

Treatment of produced water using chemical and biological unit operations.  

E-Print Network (OSTI)

??Water generated along with oil and gas during coal bed methane and oil shale operations is commonly known as produced water, formation water, or oilfield… (more)

Li, Liang

2010-01-01T23:59:59.000Z

52

Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 3, January and February 2006  

Energy.gov (U.S. Department of Energy (DOE))

Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit Operations, part of Supplement Number 3 to the Operating Plan of Mirant Potomac River, LLC

53

Exhibit D: Mirant Potomac River Schedule of Unit Operations: January- March 2006  

Energy.gov (U.S. Department of Energy (DOE))

Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit Operations related to Supplement Number 4 of the Operating Plan of Mirant Potomac River, LLC

54

Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 4, January- March 2006  

Energy.gov (U.S. Department of Energy (DOE))

Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit Operations in support of Supplement Number 4 to the Operating Plan of Mirant Potomac River, LLC

55

Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1  

SciTech Connect

The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy`s (DOE`s) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement.

NONE

1994-01-01T23:59:59.000Z

56

Definition: Kilowatt-hour | Open Energy Information  

Open Energy Info (EERE)

Kilowatt-hour Kilowatt-hour Jump to: navigation, search Dictionary.png Kilowatt-hour A unit of measure for energy, typically applied to electricity usage; equal to the amount of energy used at a rate of 1,000 watts over the course of one hour. One kWh is equivalent to 3,412 Btu, or 3,600 kJ.[1][2] View on Wikipedia Wikipedia Definition The kilowatt hour, or kilowatt-hour, (symbol kW·h, kW h or kWh) is a unit of energy equal to 1000 watt hours or 3.6 megajoules. For constant power, energy in watt hours is the product of power in watts and time in hours. The kilowatt hour is most commonly known as a billing unit for energy delivered to consumers by electric utilities. Also Known As kWh Related Terms British thermal unit, Electricity, Energy, Kilowatt, energy, electricity generation

57

Microchannel apparatus comprising plural microchannels and methods of conducting unit operations  

DOE Patents (OSTI)

Microchannel apparatus comprising a header and plural flow microchannels is described in which orifices connect the header and the flow microchannels. The orifices constrict flow. The ratio of the cross-sectional area of each of the orifices to the cross-sectional area of the flow microchannels connected to the orifices is between 0.0005 and 0.1. Also described is microchannel apparatus for conducting unit operations in which a device comprises two arrays of microchannels, and a unit operation is conducted on a fluid as it passes through the first set of microchannels and into a header where a second unit operation is performed, and then the fluid stream passes into the second array of microchannels where the first unit operation is again performed. Methods of conducting unit operations in the apparatuses are also described.

Wegeng, Robert S [Richland, WA; TeGrotenhuis, Ward E [Kennewick, WA; Whyatt, Greg A [West Richland, WA

2009-03-10T23:59:59.000Z

58

Electric vehicle fleet operations in the United States  

DOE Green Energy (OSTI)

The US Department of Energy (DOE) is actively supporting the development and commercialization of advanced electric vehicles, batteries, and propulsion systems. As part of this effort, the DOE Field Operations Program is performing commercial validation testing of electric vehicles and supporting the development of an electric vehicle infrastructure. These efforts include the evaluation of electric vehicles in baseline performance, accelerated reliability, and fleet operations testing. The baseline performance testing focuses on parameters such as range, acceleration, and battery charging. This testing, performed in conjunction with EV America, has included the baseline performance testing of 16 electric vehicle models from 1994 through 1997. During 1997, the Chevrolet S10 and Ford Ranger electric vehicles were tested. During 1998, several additional electric vehicles from original equipment manufacturers will also be baseline performance tested. This and additional information is made available to the public via the Program`s web page (http://ev.inel.gov/sop). In conjunction with industry and other groups, the Program also supports the Infrastructure Working Council in its development of electric vehicle communications, charging, health and safety, and power quality standards. The Field Operations Program continues to support the development of electric vehicles and infrastructure in conjunction with its qualified vehicle test partners: Electric Transportation Applications, and Southern California Edison. The Field Operations Program is managed by the Lockheed Martin Idaho Technologies Company at the Idaho National Engineering and Environmental Laboratory.

Francfort, J.E. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States). Idaho National Engineering and Environmental Lab.; O`Hara, D. [Dept. of Energy, Washington, DC (United States)

1998-03-01T23:59:59.000Z

59

UNITED STATES ENERGY RESEARCH AND DEVELOPMENT CHICAGO OPERATIONS OFFICE  

Office of Legacy Management (LM)

CHICAGO OPERATIONS OFFICE 9800 SOUTH CASS AVENUE ARGONNE, ILLINOIS 80439 TELEPHONE (312) 739-7711 ADMINISTRATION JUL 11977 Hal Hollister, Acting Director Division of Operational and Environmental Safety, HQ RESURVEY PROGRAM - BRUSH BERYLLIUM COMPANY A visit to the Brush Beryllium Company (presently called Brush Wellman), Cleveland, Ohio was made by Edward J. Jascewsky and members of the Argonne National Laboratory survey team on May 17, 1977. The group met with Martin Powers and Nate Bass, Vice Presidents of Brush Wellman. The purpose of the visit was to determine if any radiological survey was needed as a result of past Atomic Energy Commission (AEC) contract work. The work performed by Brush Beryllium involving radioactive materials was done at two locations in the Cleveland area. One site was located

60

United States Army; Fort Gordon, Georgia, Range Control Operations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT DRAFT Joint Standard Operating Procedures (JSOP) For Military Training at the Savannah River Site August 2011 U.S. Department of Energy, Savannah River Operations Office, Savannah River Site And U.S. Department Of The Army, Fort Gordon, Georgia DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 2 Chapter 1 General, 1.1 Purpose, page 8 1.2 Scope, page 8 1.3 Explanation of abbreviation and terms, page 8 1.4 Applicability, page 8 1.5 Deviations and Amendments, page 8 Chapter 2 Responsibilities 2.1 DOE-Savannah River Point of Contact (DOE-SR POC), page 10 2.2 DOE-Assistant Manager for Integration and Planning (AMIP), page 10 2.3 SRNS Interface Management Office, page 10 2.4 Directorate of Plans, Training, Mobilization, and Security (DPTMS), Page 10

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

EA-0821: Operation of the Glass Melter Thermal Treatment Unit at the U.S.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Operation of the Glass Melter Thermal Treatment Unit at 1: Operation of the Glass Melter Thermal Treatment Unit at the U.S. Department of Energy's Mound Plant, Miamisburg, Ohio EA-0821: Operation of the Glass Melter Thermal Treatment Unit at the U.S. Department of Energy's Mound Plant, Miamisburg, Ohio SUMMARY This EA evaluates the environmental impacts of a proposal to use an existing glass melter thermal treatment unit (also known as a Penberthy Pyro-Converter joule-heated glass furnace) for the treatment of hazardous and mixed wastes (waste containing both hazardous and radioactive material at the U.S. Department of Energy's Mound Plant in Miamisburg, Ohio. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD July 26, 1995 EA-0821: Finding of No Significant Impact Operation of the Glass Melter Thermal Treatment Unit at the U.S. Department

62

United States Government Department of Energy Idaho Operations Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2012 0, 2012 Subject: Fiscal Year 2012 National Environmental Policy Act Planning Summary (OS-ETSD-12-011) To: Timothy G. Lynch, Acting General Counsel DOE-HQ, GC-IIFORS In accordance with DOE Order 451.1 B, the Department of Energy, Idaho Operations Office (DOE-ID) is submitting its Fiscal Year (FY) 2012 National Environmental Policy Act (NEPA) Planning Summary. The FY 2012 NEPA Planning Summary will be made available to the public as required by the Order. Estimated NEPA document costs are provided for actions that are well enough defined from a planning and budget perspective. If you have any questions concerning the attachment or the DOE-ID NEPA compliance program, please contact me or our NEP A Compliance Officer, Jack Depperschmidt, at (208) 526-5053.

63

United States Government Department of Energy Idaho Operations Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2011 1, 2011 Subject: 2011 National Environmental Policy Act Planning Summary (OS-ETSD-11-001) To: Scott Blake Harris, General Counsel DOE-HQ, GC-1IFORS In accordance with DOE Order 451.1 B, the Department of Energy, Idaho Operations Office (DOE-ID) is submitting its 2011 National Environmental Policy Act (NEPA) Planning Summary. The 2011 NEPA Planning Summary will be made available to the public as required by the Order. Estimated NEPA document costs are provided for actions that are well enough defined from a planning and budget perspective. If you have any questions concerning the attachment or the DOE-ID NEPA compliance program, please contact me or our NEPA Compli (208) 526-5053. ',Manager Attachment cc: C. M. Borgstrom, DOE-HQ, GC-54/FORS B. M. Angle, BBWI, MS-3428

64

Transitioning to 12-hour shifts  

Science Conference Proceedings (OSTI)

In 1989, Yankee Rowe nuclear power station successfully implemented a 12-hour shift schedule for all shiftworkers (control room personnel, auxiliary operators, and radiation protection shift technicians) with many positive effects on morale, motivation, and performance. The transition from an 8-hour to a 12-hour shift schedule was initiated, organized, and promoted by the shiftworkers themselves after they had identified numerous inadequacies in the 8-hour shift schedule. Preliminary and final implementation required several steps: (a) a survey of needs, (b) research of potential schedules, (c) cost/benefit analysis, (d) resolution of any union contract conflicts, (e) management approval, and (f) trial shift schedule periods.

Suter, P.S.; Cervassi, S.M.

1993-03-01T23:59:59.000Z

65

An Assessment of Operational TIROS–N Temperature Retrievals over the United States  

Science Conference Proceedings (OSTI)

For a 14-day period in late March and early April 1979, TIROS-N operational soundings have been compared with independent temperature analyses produced by the National Meteorological Center. Over the United States and southern Canada, analyzed ...

Thomas W. Schlatter

1981-01-01T23:59:59.000Z

66

An Innovative Method for Dynamic Characterization of Fan Filter Unit Operation.  

E-Print Network (OSTI)

that is affected by fan-wheel design, air-path and size,by- 4-ft) fan filter units with various design, operation,differential – the design and control schemes of fan filter

Xu, Tengfang

2006-01-01T23:59:59.000Z

67

Description of work for 100-DR-2 Operable Unit Vadose Drilling/test pits  

SciTech Connect

This report describes the scope of work for the boreholes/test pits of the 100-DR-2 Operable Unit. Sampling and field activities include: Soil screening; geologic sampling; soil sampling (physical property); analytical sampling and depths; and geophysical logging.

Naiknimbalkar, N.

1993-08-01T23:59:59.000Z

68

Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors  

DOE Green Energy (OSTI)

The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a single operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.

OHara J. M.; Higgins, J.; DAgostino, A.

2012-01-17T23:59:59.000Z

69

Cycling Operation of Fossil Plants: Volume 1: Cycling Considerations for Niagara Mohawk's Oswego Unit 5  

Science Conference Proceedings (OSTI)

Fossil plants are being converted to cycling operation to accommodate daily load swings and to decrease the overall system fuel costs. This report summarizes the methods and results of an engineering study of three two-shift cycling approaches considered for Niagara Mohawk's Oswego unit 5: superheater/turbine bypass, variable pressure operations, and full-flow condensate polishing.

1991-05-01T23:59:59.000Z

70

Superfund Record of Decision (EPA Region 6): Texarkana Wood Preserving Company, Operable Unit 2, Texarkana, TX, September 1993  

SciTech Connect

This decision document presents the selected remedial action for Operable Unit Two for the Texarkana Wood Preserving Company (TWPC) Superfund Site (Site) in Texarkana, Texas. This operable unit is the second of two operable units planned for the Site. Operable Unit Two involves remediation of the deeper ground water contaminated above the action levels in a limited area of the Silty Sand Zone around Monitoring Well-16.

Not Available

1993-09-30T23:59:59.000Z

71

OpenEI - hourly emission factors  

Open Energy Info (EERE)

http:en.openei.orgdatasetstaxonomyterm4640 en Hourly Energy Emission Factors for Electricity Generation in the United States http:en.openei.orgdatasetsnode488...

72

Results of toxicity tests and chemical analyses conducted on sediments collected from the TNX Outfall Delta Operable Unit, July 1999  

SciTech Connect

In order to provide unit specific toxicity data that will be used to address critical uncertainty in the ecological risk assessment (ERA) for the TNX Outfall Delta Operable Unit (TNXOD OU), sediments were collected from eight locations in the Inner Swamp portion of the operable unit and two unit specific background locations. These samples were analyzed for total mercury, total uranium, and sediment toxicity.

Specht, W.L.

2000-02-11T23:59:59.000Z

73

United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.

Not Available

1994-06-01T23:59:59.000Z

74

Interim action record of decision remedial alternative selection: TNX area groundwater operable unit  

Science Conference Proceedings (OSTI)

This document presents the selected interim remedial action for the TNX Area Groundwater Operable Unit at the Savannah River Site (SRS), which was developed in accordance with CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and to the extent practicable, the National Oil and Hazardous Substances Pollution contingency Plan (NCP). This decision is based on the Administrative Record File for this specific CERCLA unit.

Palmer, E.R.

1994-10-01T23:59:59.000Z

75

Groundwater Monitoring and Field Sampling Plan for Operable Unit 10-08  

SciTech Connect

This plan describes the groundwater sampling and water level monitoring that will be conducted to evaluate contaminations in the Snake River Plain Aquifer entering and leaving the Idaho National Laboratory. The sampling and monitoring locations were selected to meet the data quality objectives detailed in this plan. Data for the Snake River Plain Aquifer obtained under this plan will be evaluated in the Operable Unit 10-08 Remedial Investigation/Feasibility Study report and will be used to support the Operable Unit 10-08 Sitewide groundwater model.

M. S. Roddy

2007-05-01T23:59:59.000Z

76

Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System Remedial Action Request  

SciTech Connect

This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The site addressed in this report was defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for the site have been accomplished and is hereafter considered a No Further Action site.

L. Davison

2009-06-30T23:59:59.000Z

77

Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System Remedial Action Report  

SciTech Connect

This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The site addressed in this report was defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for the site have been accomplished and is hereafter considered a No Further Action site.

Lee Davison

2009-06-30T23:59:59.000Z

78

Operable Unit 3-13, Group 3, Other Surface Soils (Phase I) Remedial Action Report  

SciTech Connect

This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 3, Other Surface Soils, Phase I sites at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The 10 sites addressed in this report were defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for these 10 sites have been accomplished and are hereafter considered No Action or No Further Action sites.

L. Davison

2007-07-31T23:59:59.000Z

79

Operable Unit 3-13, Group 3, Other Surface Soils (Phase II) Field Sampling Plan  

SciTech Connect

This Field Sampling Plan describes the Operable Unit 3-13, Group 3, Other Surface Soils, Phase II remediation field sampling activities to be performed at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Sampling activities described in this plan support characterization sampling of new sites, real-time soil spectroscopy during excavation, and confirmation sampling that verifies that the remedial action objectives and remediation goals presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13 have been met.

G. L. Schwendiman

2006-07-27T23:59:59.000Z

80

Phase 1 remedial investigation report for 200-BP-1 operable unit. Volume 1  

SciTech Connect

The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit.

Not Available

1993-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

More Than 410,000 Hours of Real-World Fuel Cell System Operation Have Been Analyzed by NRELs Technology Validation Team (Fact Sheet), Hydrogen and Fuel Cell Technical Highlights (HFCTH), NREL (National Renewable Energy Laboratory)  

NLE Websites -- All DOE Office Websites (Extended Search)

0362 * February 2011 0362 * February 2011 More Than 410,000 Hours of Real-World Fuel Cell System Operation Have Been Analyzed by NREL's Technology Validation Team Team: Jennifer Kurtz, Keith Wipke, Sam Sprik, and Todd Ramsden Accomplishment: NREL analyzed more than 410,000 hours of real-world fuel cell operation from more than 470 government-funded demonstrations in light-duty vehicle, bus, material handling, and backup power markets. Context: NREL's analyses validates the technology in real-world applications, reports on the technology status, and facilitates the development of fuel cell technologies, manufacturing, and operations in strategic markets-material handling equipment, backup power, and stationary power-where fuel cells can compete with conventional technologies.

82

Limited field investigation report for the 100-DR-1 Operable Unit  

Science Conference Proceedings (OSTI)

This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-DR-1 Source Operable Unite LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land use scenarios. The 100-DR-1 Operable Unit is one of four operable units associated with the 100 D/DR Area at the Hanford Site. The 100-DR-1 Operable Unit encompasses approximately 1.5 km{sup 2} (0.59 mi{sup 2}) and is located immediately adjacent to the Columbia River shoreline. In general, it contains waste facilities associated with the original plant facilities constructed to support D Reactor facilities, as well as cooling water retention basin systems for both D and DR Reactors. The 100-DR-1 LFI began the investigative phase of the remedial investigation for a select number of high-priority sites. The LFI was performed to provide additional data needed to support selection, design and implementation of IRM, if needed. The LFI included data compilation, nonintrusive investigations, intrusive investigations, summarization of 100 Area aggregate studies, and data evaluation.

Not Available

1994-06-01T23:59:59.000Z

83

Qualitative risk assessment for the 100-HR-3 groundwater operable unit  

Science Conference Proceedings (OSTI)

This report provides the qualitative risk assessment for the 100-HR-3 operable unit on the Hanford Reservation. 100-HR-3 is a ground water unit. The purpose of the QRA at the 100-HR-3 operable unit is to focus on a predefined set of human and environmental exposure scenarios in order to provides sufficient information that will assist the Tri-Party signatories (Washington State Department of Ecology, EPA and US DOE) in making defensible decisions on the necessity of Interim Remedial Measures. Frequent- and occasional-use exposure scenarios are evaluated in the human health risk assessment to provide bounding estimates of risk. The ecological risk assessment consists of an evaluation of the risks to riparian and aquatic receptors which live in or near the Columbia River.

Vukelich, S.E. [Golder Associates, Inc., Richland, WA (United States)

1994-09-22T23:59:59.000Z

84

Impact of High Wind Power Penetrations on Hydroelectric Unit Operations in the WWSIS  

NLE Websites -- All DOE Office Websites (Extended Search)

High Wind Power High Wind Power Penetrations on Hydroelectric Unit Operations in the WWSIS Bri-Mathias Hodge, Debra Lew, and Michael Milligan Technical Report NREL/TP-5500-52251 July 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 The Impact of High Wind Power Penetrations on Hydroelectric Unit Operations in the WWSIS Bri-Mathias Hodge, Debra Lew, and Michael Milligan Prepared under Task No. WE110810 Technical Report NREL/TP-5500-52251 July 2011 NOTICE

85

Annual Summary Report Calendar Year 2000 for the 100-HR-3, 100-KR-4, and 100-NR-2 Operable Units and Pump-and-Treat Operations  

Science Conference Proceedings (OSTI)

This annual progress and performance evaluation report discusses the groundwater remedial actions in the 100 Area, including the interim actions at the 100-HR-3 and 100-KR-4 Operable Units, and also discusses the expedited response action in the 100-NR-2 operable unit.

G. B. Mitchem

2001-08-22T23:59:59.000Z

86

More Than 410,000 Hours of Real-World Fuel Cell System Operation Have Been Analyzed by NREL's Technology Validation Team (Fact Sheet)  

DOE Green Energy (OSTI)

This fact sheet discusses how researchers at the National Renewable Energy Laboratory (NREL) are working to validate hydrogen and fuel cell systems in real-world settings. NREL strives to provide an independent third-party technology assessment that focuses on fuel cell system and hydrogen infrastructure performance, operation, maintenance, and safety.

Kurtz, J.; Wipke, K.; Sprik, S.; Ramsden, T.

2011-02-01T23:59:59.000Z

87

RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington  

Science Conference Proceedings (OSTI)

The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

Not Available

1993-06-01T23:59:59.000Z

88

In Situ Bioremediation Interim Remedial Action Report, Test Area North, Operable Unit 1-07B  

E-Print Network (OSTI)

This Interim Remedial Action Report is for the in situ bioremediation remedial component of Operable Unit 1-07B at Test Area North at the Idaho National Laboratory. Under U.S. Environmental Protection Agency guidance, an interim report for a long-term groundwater remedial action provides a chronology of events and a description of the remedial action facilities, systems, components, and operating documents that lead to a declaration that the system is operational and functional. It is the conclusion of this report that the in situ bioremediation remedial component includes the infrastructure and programs necessary to achieve the objectives of the in situ bioremediation remedial component for contaminated groundwater in the vicinity of the TSF-05 well; therefore, it can be deemed operational and functional. iii ivCONTENTS ABSTRACT.................................................................................................................................................iii

Unit -b; Prepared For The

2009-01-01T23:59:59.000Z

89

Remedial System Performance Improvement for the 200-ZP-1_PW-1 Operable Units at Hanford  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford Operations Review Report: Feasibility Study Strategies and Remedial System Performance Improvement for the 200- ZP-1/PW-1 Operable Units at Hanford Prepared for Office of Groundwater and Soil Remediation Office of Environmental Management February 9, 2007 i EXECUTIVE SUMMARY At the request of the U.S. Department of Energy, Headquarters' Office of Environmental Management, the Office of Groundwater and Soil Remediation (EM-22), performed a Remediation System Evaluation (RSE) of the 200-ZP-1/PW-1 groundwater pump and treat (P&T) system, as well as the vadose zone Soil Vapor Extraction (SVE) system at the Hanford

90

Monticello Mill Tailings Site Operable Unit I11 Remedial Investigation Addendum1  

Office of Legacy Management (LM)

Monticello Mill Tailings Site Monticello Mill Tailings Site Operable Unit I11 Remedial Investigation Addendum1 Focused Feasibility Study January 2004 Prepared by U.S. Department of Energy Grand Junction, Colorado Work performed under DOE Contract No. DE-AC1342GJ79491 DOE Task Order No. ST03-205 Document N u m b e r Q0029500 S i g t ~ a t u r e Page Signature Page Monticello Mill Tailings Site Operable Unit I11 Remedial Investigation Addendud Focused Feasibility Study January 2004 Submitted By: Arthur W. Kleinrath, Project Manager U.S. Department of Energy, Grand Junction, Colorado U.S. Department of Energyat Gmnd Junction MMTS OU 111 Remedial Investigation AddendutdFocuscd Feasibilily Study January 2004 Final iii This page intentionally left blank Document Number Q0029500 Contents U.S. Department of Energy at Grand Junction MMTS OU III Remedial Investigation Addendum/Focused Feasibility Study

91

Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13  

SciTech Connect

This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year.

Richard P. Wells

2007-03-23T23:59:59.000Z

92

Discrete Sampling Test Plan for the 200-BP-5 Operable Unit  

SciTech Connect

The Discrete Groundwater Sampling Project is conducted by the Pacific Northwest National Laboratory (PNNL) on behalf of CH2M HILL Plateau Remediation Company. The project is focused on delivering groundwater samples from proscribed horizons within select groundwater wells residing in the 200-BP-5 Operable Unit (200-BP-5 OU) on the Hanford Site. This document provides the scope, schedule, methodology, and other details of the PNNL discrete sampling effort.

Sweeney, Mark D.

2010-02-04T23:59:59.000Z

93

hourly | OpenEI  

Open Energy Info (EERE)

hourly hourly Dataset Summary Description This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types by location. Source Commercial and Residential Reference Building Models Date Released April 18th, 2013 (7 months ago) Date Updated July 02nd, 2013 (5 months ago) Keywords building building demand building load Commercial data demand Energy Consumption energy data hourly kWh load profiles Residential Data Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually

94

Surface soil sampling plan for the 200-UP-2 operable unit  

SciTech Connect

The purpose of the Description of Work (DOW) is to provide detailed guidance for implementation of the field activities outlined in the 200-UP-2 Operable Unit Work Plan. This work plan provides the basis for conducting a limited field investigation (LFI) in the unit, with the DOW outlining the protocols and procedures to be utilized in performing the surface soil sampling. As outlined in the Work Plan, the data to be collected in the LFI will be utilized to determine the need for, and possible selection of, an Interim Remedial Measure (IRM). In order to do that, detailed information on the current nature and extent of contamination in surface soils at selected management units is required for assessment in conjunction with the existing areas of highest concentration for each unit. Field screening efforts using surface radiation surveys will allow for surface soil samples to be collected from those points that represent the highest contaminant concentrations. Analysis of these samples will provide data on the types and concentrations of the contaminants of concern.

Mitchell, R.M.

1994-05-01T23:59:59.000Z

95

Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action  

SciTech Connect

This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

Not Available

1993-12-01T23:59:59.000Z

96

Operational characteristics of anaerobic digesters at selected municipal wastewater treatment facilities in the United States  

DOE Green Energy (OSTI)

Bench-scale and pilot plant studies at PNL have shown that powdered activated carbon is effective in improving volatile solids destruction and gas production in anaerobic digesters that are operating at less than normally expected levels of efficiency. To evaluate the applicability of this technology to digesters in the United States, digester operating characteristics at 60 facilities were surveyed and the number of stressed digesters estimated. The results show that although median values of the operating parameters conformed with those of a well-operated digester, 30% of the digesters surveyed were stressed with regard to at least one important parameter. Of the 30 largest treatment plants in the U.S., 7 fell into this category. Digester gas production and usage were then examined to determine the importance of methane off-gas as an energy source. A conservative estimate is that the gas produced nationally represents a heating value of about 2.36 x 10/sup 13/ Btu/year with a present value of $40 million. Of this amount, an estimated 75% is used either onsite or sold. Onsite uses include heating digesters and buildings, incinerating sludge, operating equipment, and generating electricity. The other 25% is flared and the energy value lost. The present value of the flared gas is about $10 million/year. Natural gas prices are projected to increase 150% over the next 7 years. If the present utilization ratio continues, the flared gas will be worth approximately $27 million in 1985. Presently, digester gas is mainly used for process heating and operating equipment. The technical and economic feasibility of recovering digester gas for electrical power generation, onsite equipment operation, and sales to other consumers (utilities, private companies) should be thoroughly investigated. If fuel gas recovery and utilization are found to be desirable, consideration should be given to expanding and upgrading anaerobic digester facilities in the U.S.

Spencer, R.R.; Wong, A.L.; Coates, J.A.; Ahlstrom, S.B.

1978-12-01T23:59:59.000Z

97

An Innovative Method for Dynamic Characterization of Fan Filter Unit Operation.  

E-Print Network (OSTI)

Filtration: Fan filter units. Final Report, LawrencePerformance of Fan Filter Units, Version 1.3. ” BerkeleyEfficient Fan filter units,” Proceedings of Semiconductor

Xu, Tengfang

2006-01-01T23:59:59.000Z

98

Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington  

SciTech Connect

This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

Not Available

1993-05-01T23:59:59.000Z

99

Current Conditions Risk Assessment for the 300-FF-5 Groundwater Operable Unit  

SciTech Connect

This report updates a baseline risk assessment for the 300 Area prepared in 1994. The update includes consideration of changes in contaminants of interest and in the environment that have occurred during the period of interim remedial action, i.e., 1996 to the present, as well as the sub-regions, for which no initial risk assessments have been conducted. In 1996, a record of decision (ROD) stipulated interim remedial action for groundwater affected by releases from 300 Area sources, as follows: (a) continued monitoring of groundwater that is contaminated above health-based levels to ensure that concentrations continue to decrease, and (b) institutional controls to ensure that groundwater use is restricted to prevent unacceptable exposure to groundwater contamination. In 2000, the groundwater beneath the two outlying sub-regions was added to the operable unit. In 2001, the first 5-year review of the ROD found that the interim remedy and remedial action objectives were still appropriate, although the review called for additional characterization activities. This report includes a current conditions baseline ecological and human health risk assessment using maximum concentrations in the environmental media of the 300-FF-5 Operable Unit and downstream conditions at the City of Richland, Washington. The scope for this assessment includes only current measured environmental concentrations and current use scenarios. Future environmental concentrations and future land uses are not considered in this assessment.

Miley, Terri B.; Bunn, Amoret L.; Napier, Bruce A.; Peterson, Robert E.; Becker, James M.

2007-11-01T23:59:59.000Z

100

Phase I and II feasibility study report for the 300-FF-5 operable unit  

SciTech Connect

The purpose of this Phase I/II feasibility study is to assemble and screen a list of alternatives for remediation of the 300-FF-5 operable site on the Hanford Reservation. This screening is based on information gathered in the Phase I Remedial Investigation (RI) and on currently available information on remediation technologies. The alternatives remaining after screening provide a range of response actions for remediation. In addition, key data needs are identified for collection during a Phase II RI (if necessary). This Phase I/II FS represents a primary document as defined by the Tri-Party Agreement, but will be followed by a Phase III FS that will further develop the alternatives and provide a detailed evaluation of them. The following remedial action objectives were identified for the 300-FF-5 operable unit: Limit current human exposure to contaminated groundwater in the unit; Limit discharge of contaminated groundwater to the Columbia River; Reduce contaminant concentrations in groundwater below acceptable levels by the year 2018.

NONE

1993-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Final Hazard Categorization for the Remediation of Six 300-FF-2 Operable Unit Solid Waste Burial Grounds  

SciTech Connect

This report provides the final hazard categorization for the remediation of six 300-FF-2 Operable Unit Burial Grounds, the 618-1, 618-2, 618-3, 618-7, 618-8, and 618-13 sites.

J. D. Ludowise; K. L. Vialetti

2008-05-12T23:59:59.000Z

102

A framework and methodology for enhancing operational requirements development : United States Coast Guard cutter project case study  

E-Print Network (OSTI)

Within any major United States Coast Guard cutter acquisition project, developing the operational requirements in the early phases of acquisition is difficult as the complexity of the system is not easily understood until ...

Schofield, Douglas M. (Douglas MacLean)

2010-01-01T23:59:59.000Z

103

Liquid phase methanol LaPorte process development unit: Modification, operation, and support studies  

DOE Green Energy (OSTI)

Liquid-entrained operations at the LaPorte Liquid Phase Methanol (LPMEOH) Process Development Unit (PDU) continued during June and July 1988 under Tasks 2.1 and 2.2 of Contract No. DE-AC22-87PC90005 for the US Department of Energy. The primary focus of this PDU operating program was to prepare for a confident move to the next scale of operation with an optimized and simplified process. Several new design options had been identified and thoroughly evaluated in a detailed process engineering study completed under the LPMEOH Part-2 contract (DE-AC22-85PC80007), which then became the basis for the current PDU modification/operating program. The focus of the Process Engineering Design was to optimize and simplifications focused on the slurry loop, which consists of the reactor, vapor/liquid separator, slurry heat exchanger, and slurry circulation pump. Two-Phase Gas Holdup tests began at LaPorte in June 1988 with nitrogen/oil and CO- rich gas/oil systems. The purpose of these tests was to study the hydrodynamics of the reactor, detect metal carbonyl catalyst poisons, and train operating personnel. Any effect of the new gas sparger and the internal heat exchanger would be revealed by comparing the hydrodynamic data with previous PDU hydrodynamic data. The Equipment Evaluation'' Run E-5 was conducted at the LaPorte LPMEOH PDU in July 1988. The objective of Run E-5 was to systematically evaluate each new piece of equipment (sparger, internal heat exchanger, V/L disengagement zone, demister, and cyclone) which had been added to the system, and attempt to run the reactor in an internal-only mode. In addition, a successful catalyst activation with a concentrated (45 wt % oxide) slurry was sought. 9 refs., 26 figs., 15 tabs.

Not Available

1991-01-02T23:59:59.000Z

104

CHEMICAL TECHNOLOGY DIVISION. UNIT OPERATIONS SECTION MONTHLY PROGRESS REPORT, JUNE 1962  

SciTech Connect

The development of foam separation as a unit operation was considered from the distributor design and gas rate standpoints. The development of a shear and leach process for power reactor fuel processing is reported in which carburized Yankee prototype fuel assemblies were sheared to determine the effect of fuel element condition on the nature of the chopped pieces. A Squarkeen No. 3 moving blade lasted for 5894 cuts while a Kleencut blade failed at 320 cuts under normal program use. A plastics and coating material testign program for the Transuranium facility is under way. The Vo1atility development program is stadying the recycle of the salt charge for Zr fuel element dissolution and has completed the fourth recycle test. The radioactive waste processing program has completed the test R-65 which studied the movement of mercury out of the calciner during the processing of TBP-25 waste. (auth)

Whatley, M.E.; Haas, P.A.; Horton, R.W.; Ryon, A.D.; Suddath, J.C.; Watson, C.D.

1963-01-29T23:59:59.000Z

105

Eielson Air Force Base operable unit 2 and other areas record of decision  

SciTech Connect

This decision document presents the selected remedial actions and no action decisions for Operable Unit 2 (OU2) at Eielson Air Force Base (AFB), Alaska, chosen in accordance with state and federal regulations. This document also presents the decision that no further action is required for 21 other source areas at Eielson AFB. This decision is based on the administrative record file for this site. OU2 addresses sites contaminated by leaks and spills of fuels. Soils contaminated with petroleum products occur at or near the source of contamination. Contaminated subsurface soil and groundwater occur in plumes on the top of a shallow groundwater table that fluctuates seasonally. These sites pose a risk to human health and the environment because of ingestion, inhalation, and dermal contact with contaminated groundwater. The purpose of this response is to prevent current or future exposure to the contaminated groundwater, to reduce further contaminant migration into the groundwater, and to remediate groundwater.

Lewis, R.E.; Smith, R.M.

1994-10-01T23:59:59.000Z

106

Data validation report for the 100-HR-3 Operable Unit first quarter 1994 groundwater sampling data  

Science Conference Proceedings (OSTI)

Westinghouse-Hanford has requested that a minimum of 20% of the total number of Sample Delivery Groups be validated for the 100-HR-3 Operable Unit First Quarter 1994 Groundwater Sampling Investigation. Therefore, the data from the chemical analysis of twenty-four samples from this sampling event and their related quality assurance samples were reviewed and validated to verify that reported sample results were of sufficient quality to support decisions regarding remedial actions performed at this site. The samples were analyzed by Thermo-Analytic Laboratories (TMA) and Roy F. Weston Laboratories (WESTON) using US Environmental Protection Agency (EPA) CLP protocols. Sample analyses included: inorganics; and general chemical parameters. Forty-two samples were validated for radiochemical parameters by TMA and Teledyne.

Biggerstaff, R.L.

1994-06-24T23:59:59.000Z

107

An Innovative Method for Dynamic Characterization of Fan Filter Unit Operation.  

E-Print Network (OSTI)

Laboratory Methods of Testing Fans for Rating. ASHRAE. 1987.Efficient Filtration: Fan filter units. Final Report,Energy Performance of Fan Filter Units, Version 1.3. ”

Xu, Tengfang

2006-01-01T23:59:59.000Z

108

Large-Scale Pumping Test Recommendations for the 200-ZP-1 Operable Unit  

Science Conference Proceedings (OSTI)

CH2M Hill Plateau Remediation Company (CHPRC) is currently assessing aquifer characterization needs to optimize pump-and-treat remedial strategies (e.g., extraction well pumping rates, pumping schedule/design) in the 200-ZP-1 operable unit (OU), and in particular for the immediate area of the 241 TX-TY Tank Farm. Specifically, CHPRC is focusing on hydrologic characterization opportunities that may be available for newly constructed and planned ZP-1 extraction wells. These new extraction wells will be used to further refine the 3-dimensional subsurface contaminant distribution within this area and will be used in concert with other existing pump-and-treat wells to remediate the existing carbon tetrachloride contaminant plume. Currently, 14 extraction wells are actively used in the Interim Record of Decision ZP-1 pump-and-treat system for the purpose of remediating the existing carbon tetrachloride contamination in groundwater within this general area. As many as 20 new extraction wells and 17 injection wells may be installed to support final pump-and-treat operations within the OU area. It should be noted that although the report specifically refers to the 200-ZP-1 OU, the large-scale test recommendations are also applicable to the adjacent 200-UP-1 OU area. This is because of the similar hydrogeologic conditions exhibited within these two adjoining OU locations.

Spane, Frank A.

2010-09-08T23:59:59.000Z

109

Remedial investigation/feasibility study report for Lower Watts Bar Reservoir Operable Unit  

SciTech Connect

This document is the combined Remedial Investigation and Feasibility Study Report for the lower Watts Bar Reservoir (LWBR) Operable Unit (OU). The LWBR is located in Roane, Rhea, and Meigs counties, Tennessee, and consists of Watts Bar Reservoir downstream of the Clinch river. This area has received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As required by this law, the ORR and all off-site areas that have received contaminants, including LWBR, must be investigated to determine the risk to human health and the environment resulting from these releases, the need for any remedial action to reduce these risks, and the remedial actions that are most feasible for implementation in this OU. Contaminants from the ORR are primarily transported to the LWBR via the Clinch River. There is little data regarding the quantities of most contaminants potentially released from the ORR to the Clinch River, particularly for the early years of ORR operations. Estimates of the quantities released during this period are available for most radionuclides and some inorganic contaminants, indicating that releases 30 to 50 years ago were much higher than today. Since the early 1970s, the release of potential contaminants has been monitored for compliance with environmental law and reported in the annual environmental monitoring reports for the ORR.

NONE

1995-03-01T23:59:59.000Z

110

Operable Unit 1 remedial investigation report, Eielson Air Force Base, Alaska  

Science Conference Proceedings (OSTI)

This remedial investigation report for operable Unit 1 (OU-1) at Eielson Air Force Base presents data, calculations, and conclusions as to the nature and extent of surface and subsurface contamination at the eight source areas that make up OU-1. The information is based on the 1993 field investigation result and previous investigations. This report is the first in a set of three for OU-1. The other reports are the baseline risk assessment and feasibility study. The information in these reports will lead to a Record of Decision that will guide and conclude the environmental restoration effort for OU-1 at Eielson Air Force Base. The primary contaminants of concern include fuels and fuel-related contaminants (diesel; benzene, toluene, ethylbenzene, and xylene; total petroleum hydrocarbon; polycyclic aromatic hydrocarbons), maintenance-related solvents and cleaners (volatile chlorinated hydrocarbons such as trichloroothylene), polychlorinated biphenyls, and dichlorodiphenyltrichloroethane (DDT). The origins of contaminants of concern include leaks from storage tanks, drums and piping, and spills. Ongoing operations and past sitewide practices also contribute to contaminants of concern at OU-1 source areas. These include spraying mixed oil and solvent wastes on unpaved roads and aerial spraying of DDT.

Gilmore, T.J.; Fruland, R.M.; Liikala, T.L. [and others

1994-06-01T23:59:59.000Z

111

NERSC Edison Hours Used Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Edison Hours Used Edison Hours Used Edison Usage Chart Edison Usage Chart Date Hours Used (in millions) Percent of Maximum Possible (24 hoursday) 10142013 1.852 61.8 10132013...

112

Handbook of solar energy data for south-facing surfaces in the United States. Volume III. Average hourly and total daily insolation data for 235 localities (North Carolina - Wyoming)  

DOE Green Energy (OSTI)

Average hourly and daily total insolation estimates are given for 235 US sites at a variety of array tilt angles. (MHR)

Smith, J.H.

1980-01-15T23:59:59.000Z

113

FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT  

SciTech Connect

The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km{sup 2} (586 mi{sup 2}) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 East Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986, and to the extent practicable, the NCP. This FS conforms to the conditions set forth in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 2003) and amendments, signed by the Washington State Department of Ecology (Ecology), EPA, and DOE Richland Operations Office (RL). This also includes Tri-Party Agreement Milestone M-015-00C for completing all 200 Area non-tank farm OU pre-Record of Decision (ROD) documents on or before December 31, 2011. This FS supports the final remedy selection for the 200-ZP-1 OU, as described in the Remedial Investigation/Feasibility Study Work Plan for the 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI/FS work plan) (DOE/RL-2003-55), as agreed upon by RL and EPA. Tri-Party Agreement Milestone M-015-48B required Draft A of the 200-ZP-1 OU FS and proposed plan to be transmitted to EPA by September 30, 2007. As agreed to with EPA in the 200 Area Unit Managers Meeting Groundwater Operable Unit Status (FH-0503130), the baseline risk assessment (BRA) was delayed from inclusion in the remedial investigation (RI) report and is completed and documented in this FS. The Remedial Investigation Report for 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI report) (DOE/RL-2006-24) included an evaluation of human health and ecological risks and hazards. The RI report identified the radiological and chemical contaminants of potential concern (COPCs) that represent the primary risks to human health and the environment. The complete risk assessment in this FS incorporates additional analytical data from the unconfined aquifer that were obtained during or after preparation of the RI report, particularly for carbon tetrachloride and technetium-99. This FS also includes the initial results from an ongoing study of technetium-99 contamination near WMA-T, the sampling of new wells near the 216-W-LC laundry waste crib and T Plant, updated Hanford vadose zone fate and transport modeling, and groundwater particle-tracking analysis. The purpose of this FS is to develop and evaluate al

BYRNES ME

2008-07-18T23:59:59.000Z

114

FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT  

SciTech Connect

The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km{sup 2} (586 mi{sup 2}) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 East Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986, and to the extent practicable, the NCP. This FS conforms to the conditions set forth in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 2003) and amendments, signed by the Washington State Department of Ecology (Ecology), EPA, and DOE Richland Operations Office (RL). This also includes Tri-Party Agreement Milestone M-015-00C for completing all 200 Area non-tank farm OU pre-Record of Decision (ROD) documents on or before December 31, 2011. This FS supports the final remedy selection for the 200-ZP-1 OU, as described in the Remedial Investigation/Feasibility Study Work Plan for the 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI/FS work plan) (DOE/RL-2003-55), as agreed upon by RL and EPA. Tri-Party Agreement Milestone M-015-48B required Draft A of the 200-ZP-1 OU FS and proposed plan to be transmitted to EPA by September 30, 2007. As agreed to with EPA in the 200 Area Unit Managers Meeting Groundwater Operable Unit Status (FH-0503130), the baseline risk assessment (BRA) was delayed from inclusion in the remedial investigation (RI) report and is completed and documented in this FS. The Remedial Investigation Report for 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI report) (DOE/RL-2006-24) included an evaluation of human health and ecological risks and hazards. The RI report identified the radiological and chemical contaminants of potential concern (COPCs) that represent the primary risks to human health and the environment. The complete risk assessment in this FS incorporates additional analytical data from the unconfined aquifer that were obtained during or after preparation of the RI report, particularly for carbon tetrachloride and technetium-99. This FS also includes the initial results from an ongoing study of technetium-99 contamination near WMA-T, the sampling of new wells near the 216-W-LC laundry waste crib and T Plant, updated Hanford vadose zone fate and transport modeling, and groundwater particle-tracking analysis. The purpose of this FS is to develop and evaluate alternatives for remediation of

BYRNES ME

2008-07-18T23:59:59.000Z

115

Economic Assessment of Electric-Drive Vehicle Operation in California and the United States  

E-Print Network (OSTI)

sense but lower costs per kilowatt-hour (kWh) when expressedthat battery costs below about $500US per kWh can lead toif PHEV battery costs could reach $200US per kWh, then PHEVs

Lidicker, Jeffrey R.; Lipman, Timothy E.; Shaheen, Susan A.

2010-01-01T23:59:59.000Z

116

GROUDWATER REMEDIATION AT THE 100-HR-3 OPERABLE UNIT HANFORD SITE WASHINGTON USA - 11507  

Science Conference Proceedings (OSTI)

The 100-HR-3 Groundwater Operable Unit (OU) at the Hanford Site underlies three former plutonium production reactors and the associated infrastructure at the 100-D and 100-H Areas. The primary contaminant of concern at the site is hexavalent chromium; the secondary contaminants are strontium-90, technetium-99, tritium, uranium, and nitrate. The hexavalent chromium plume is the largest plume of its type in the state of Washington, covering an area of approximately 7 km{sup 2} (2.7 mi{sup 2}) with concentrations greater than 20 {micro}g/L. Concentrations range from 60,000 {micro}g/L near the former dichromate transfer station in the 100-D Area to large areas of 20 to 100 {micro}g/L across much of the plume area. Pump-and-treat operations began in 1997 and continued into 2010 at a limited scale of approximately 200 gal/min. Remediation of groundwater has been fairly successful in reaching remedial action objectives (RAOs) of 20 {micro}g/L over a limited region at the 100-H, but less effective at 100-D. In 2000, an in situ, permeable reactive barrier was installed downgradient of the hotspot in 100-D as a second remedy. The RAOs are still being exceeded over a large portion of the area. The CH2M HILL Plateau Remediation Company was awarded the remediation contract for groundwater in 2008 and initiated a remedial process optimization study consisting of modeling and technical studies intended to enhance the remediation. As a result of the study, 1,400 gal/min of expanded treatment capacity are being implemented. These new systems are designed to meet 2012 and 2020 target milestones for protection of the Columbia River and cleanup of the groundwater plumes.

SMOOT JL; BIEBESHEIMER FH; ELUSKIE JA; SPILIOTOPOULOS A; TONKIN MJ; SIMPKIN T

2011-01-12T23:59:59.000Z

117

Data validation report for the 100-FR-3 Operable Unit, third round groundwater samples  

SciTech Connect

Westinghouse-Hanford has requested that a minimum of 20% of the total number of Sample Delivery Groups be validated for the 100-FR-3 operable Unit Third Round Groundwater sampling investigation. Therefore, the data from the chemical analysis of 51 samples from this sampling event and their related quality assurance samples were reviewed and validated to verify that reported sample results were of sufficient quality to support decisions regarding remedial actions performed at this site. The report is broken down into sections for each chemical analysis and radiochemical analysis type. Each section addresses the data package completeness, holding time adherence, instrument calibration and tuning acceptability, blank results, accuracy, precision, system performance, as well as the compound identification and quantitation. In addition, each section has an overall assessment and summary for the data packages reviewed for the particular chemical/radiochemical analyses. Detailed backup information is provided to the reader by SDG No. and sample number. For each data package, a matrix of chemical analyses per sample number is presented, as well as data qualification summaries.

Ayres, J.M.

1994-03-31T23:59:59.000Z

118

Explanation of Significant Differences for the Record of Decision for the Test Area North Operable Unit 1-10  

SciTech Connect

This Explanation of Significant Differences (ESD) applies to the remedial actions performed under the Final Record of Decision for Test Area North, Operable Unit 1-1 0, Idaho National Engineering and Environmental Laboratory (DOE-ID 1999) as amended by the Explanation of Significant Differences for the Record of Decision for the Test Area North Operable Unit 1-10 (DOE-ID 2003), the Record of Decision Amendment for the V-Tanks (TSF-09 and TSF-18) and Explanation of Significant Differences for the PM-2A Tanks (TSF-26) and TSF-06, Area IO, at Test Area North, Operable Unit 1-1 0 (DOE-ID 2004a), and the Explanation of Significant Differences for the Record of Decision for the Test Area North Operable Unit 1-10 (DOE-ID 2005). The U.S. Department of Energy (DOE) Idaho Operations Office; U.S. Environmental Protection Agency (EPA), Region 10; and the Idaho Department of Health and Welfare-now identified as the Idaho Department of Environmental Quality (DEQ)-signed the Record of Decision (ROD) in December 1999, the 2003 ESD in April 2003, the ROD Amendment/ESD in February 2004, and the 2005 ESD in January 2005. The EPA and DEQ support the need for this ESD.

D. L. Eaton

2007-01-18T23:59:59.000Z

119

Ancillary Services in the United States: Independent System Operator (ISO) Perspective (Presentation)  

SciTech Connect

The presentation provides an overview of how increasing penetrations of variable renewable energy on the electricity grid are impacting ancillary services markets in the United States.

Cochran, J.

2013-05-01T23:59:59.000Z

120

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III  

SciTech Connect

The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

R. P. Wells

2006-09-19T23:59:59.000Z

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Fiscal Year 2009 Annual Report for Operable Unit 3-14, Tank Farm Soil and INTEC Groundwater  

SciTech Connect

This annual report summarizes maintenance, monitoring, and inspection activities performed to implement the selected remedy for Waste Area Group 3, Operable Unit 3-14, Tank Farm soil and groundwater at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Results from monitoring perched water and groundwater at the Idaho Nuclear Technology and Engineering Center are also presented.

Forsythe, Howard S.

2010-04-10T23:59:59.000Z

122

Record of Decision for Tank Farm Soil and INTEC Groundwater, Operable Unit 3-14  

Science Conference Proceedings (OSTI)

This decision document presents the selected remedy for Operable Unit (OU) 3-14 tank farm soil and groundwater at the Idaho Nuclear Technology and Engineering Center (INTEC), which is located on the Idaho National Laboratory (INL) Site. The tank farm was initially evaluated in the OU 3-13 Record of Decision (ROD), and it was determined that additional information was needed to make a final decision. Additional information has been obtained on the nature and extent of contamination in the tank farm and on the impact to groundwater. The selected remedy was chosen in accordance with the Comprehensive Environmental Response, Liability and Compensation Act of 1980 (CERCLA) (42 USC 9601 et seq.), as amended by the Superfund Amendments and Reauthorization Act of 1986 (Public Law 99-499) and the National Oil and Hazardous Substances Pollution Contingency Plan (40 CFR 300). The selected remedy is intended to be the final action for tank farm soil and groundwater at INTEC. The response action selected in this ROD is necessary to protect the public health, welfare, or the environment from actual or threatened releases of hazardous substances into the environment. Such a release or threat of release may present an imminent and substantial endangerment to public health, welfare, or the environment. The remedial actions selected in this ROD are designed to reduce the potential threats to human health and the environment to acceptable levels. In addition, DOE-ID, EPA, and DEQ (the Agencies) have determined that no action is necessary under CERCLA to protect public health, welfare, or the environment at 16 sites located outside the tank farm boundary. The purposes of the selected remedy are to (1) contain contaminated soil as the radionuclides decay in place, (2) isolate current and future workers and biological receptors from contact with contaminated soil, and (3) restore the portion of Snake River Plain Aquifer contaminated by INTEC releases to Idaho Ground Water Quality standards (same as maximum contaminant levels) by reducing water infiltration through strontium-90 contaminated perched water and interbeds. In addition, the remedy will prevent future drinking water wells from being drilled into the contaminated portion of the aquifer that is in and near the INTEC facility until such time as the water is restored to maximum contaminant levels or below.

L. S. Cahn

2007-05-16T23:59:59.000Z

123

Part load operation and heat recovery optimization in cogeneration units with diesel engines  

Science Conference Proceedings (OSTI)

This paper investigates the optimization possibilities of different co-generation units with diesel engines — especially applied in small and middle-size biogas power plant installations. The first subject of the publication is the analysis of ...

Slawomir Smolen

2008-05-01T23:59:59.000Z

124

Evolution of interagency cooperation in the United States Government : the Maritime Operational Threat Response Plan  

E-Print Network (OSTI)

Following the September 11, 2001 terrorist attacks, there was concern among maritime security experts that terrorist or criminal organizations that wanted to do harm to the United States could exploit gaps that existed ...

Tomasulo, Gary L., Jr

2010-01-01T23:59:59.000Z

125

United Technologies Corporation: Achieving Competitive Excellence (ACE): Operating System Case Study  

E-Print Network (OSTI)

United Technologies Corporation (abbreviated UTC, NYSE ticker symbol UTX) is a large, industrial conglomerate that designs, manufactures, and services a broad range of products, ranging from air conditioners and elevators ...

Roth, George

2010-11-30T23:59:59.000Z

126

Winter Weather Forecasting throughout the Eastern United States. Part II: An Operational Perspective of Cyclogenesis  

Science Conference Proceedings (OSTI)

The complex combination of synoptic and mesoscale interactions, topographic influences, and large population densities poses a multitude of challenging problems to winter weather forecasters throughout the eastern United States. Over the years, ...

James J. Gurka; Eugene P. Auciello; Anthony F. Gigi; Jeff S. Waldstreicher; Kermit K. Keeter; Steven Businger; Laurence G. Lee

1995-03-01T23:59:59.000Z

127

Small scale ethanol production: design manual. [10 to 15 gallons per hour  

DOE Green Energy (OSTI)

The purpose of the project was to design, fabricate, and evaluate a small scale continuous ethanol plant. The scope of the study was to satisfy four specific objectives. The first objective was to design a small scale continuous distillation unit capable of producing 10 to 15 gallons per hour of 170 to 190 proof ethanol. A second objective was to economically fabricate the distillation unit. A third objective was to thoroughly evaluate the unit with emphasis on production potential, operation considerations, and energy balance. The fourth objective was to work with the Farm Bureau in identifying an organization that would place the unit in a production environment. The results of the study indicate that the distillation unit is capable of producing and average of 9 to 14 gallons per hour (based on alcohol percent in beer) of 174 proof ethanol. The energy ratio for distillation is a positive 3:1. Once the unit has reached steady state very little operator attention is required with the exception of periodically refluxing. Material cost of the plate column is approximately $5000. The unit could be built by an individual provided he is trained in welding and has the necessary shop equipment. 39 figures, 12 tables.

Adcock, L.E. II; Eley, M.H.; Schroer, B.J.

1981-09-01T23:59:59.000Z

128

OpenEI - hourly data  

Open Energy Info (EERE)

http:en.openei.orgdatasetstaxonomyterm4980 en Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and diffuse) data for selected stations in Sri Lanka from...

129

TECHNICAL EVALUATION OF SOIL REMEDIATION ALTERNATIVES AT THE BUILDING 812 OPERABLE UNIT, LAWRENCE LIVERMORE NATIONAL LABORATORY SITE 300  

SciTech Connect

The Department of Energy Livermore Site Office requested a technical review of remedial alternatives proposed for the Building 812 Operable Unit, Site 300 at the Lawrence Livermore National Laboratory. The team visited the site and reviewed the alternatives proposed for soil remediation in the draft RI/FS and made the following observations and recommendations. Based on the current information available for the site, the team did not identify a single technology that would be cost effective and/or ecologically sound to remediate DU contamination at Building 812 to current remedial goals. Soil washing is not a viable alternative and should not be considered at the site unless final remediation levels can be negotiated to significantly higher levels. This recommendation is based on the results of soil washing treatability studies at Fernald and Ashtabula that suggest that the technology would only be effective to address final remediation levels higher than 50 pCi/g. The technical review team identified four areas of technical uncertainty that should be resolved before the final selection of a preferred remedial strategy is made. Areas of significant technical uncertainty that should be addressed include: (1) Better delineation of the spatial distribution of surface contamination and the vertical distribution of subsurface contamination in the area of the firing table and associated alluvial deposits; (2) Chemical and physical characterization of residual depleted uranium (DU) at the site; (3) Determination of actual contaminant concentrations in air particulates to support risk modeling; and (4) More realistic estimation of cost for remedial alternatives, including soil washing, that were derived primarily from vendor estimates. Instead of conducting the planned soil washing treatability study, the team recommends that the site consider a new phased approach that combines additional characterization approaches and technologies to address the technical uncertainty in the remedial decision making. The site should redo the risk calculations as the future use scenario has changed for the site. As a result, the existing model is based on very conservative assumptions that result in calculation of unreasonably low cleanup goals. Specifically, the review team proposes that LLNL consider: (1) Revising the industrial worker scenario to a reasonable maximum exposure (RME) for a site worker that performs a weekly walk down of the area for two hours for 25 years (or an alternative RME if the exposure scenario changes); (2) Revising the ESSI of 2 mg U per kg soil for the deer mouse to account for less than 0.05 of the total ingested uranium being adsorbed by the gut; (3) Revising bioaccumulation factors (BAFs) for vegetation and invertebrates that are based on 100 mg of soluble uranium per kg of soil, as the uranium concentration in the slope soil does not average 100 mg/kg and it is not all in a soluble form; and (4) Measuring actual contaminant concentrations in air particulates at the site and using the actual values to support risk calculations. The team recommends that the site continue a phased approach during remediation. The activities should focus on elimination of the principal threats to groundwater by excavating (1) source material from the firing table and alluvial deposits, and (2) soil hotspots from the surrounding slopes with concentrations of U-235 and U-238 that pose unacceptable risk. This phased approach allows the remediation path to be driven by the results of each phase. This reduces the possibility of costly 'surprises', such as failure of soil treatment, and reduces the impact of remediation on endangered habitat. Treatment of the excavated material with physical separation equipment may result in a decreased volume of soil for disposal if the DU is concentrated in the fine-grained fraction, which can then be disposed of in an offsite facility at a considerable cost savings. Based on existing data and a decision to implement the recommended phased approach, the cost of characterization, excavation and physical

Eddy-Dilek, C.; Miles, D.; Abitz, R.

2009-08-14T23:59:59.000Z

130

2. Unit Operation Dynamic simulation Unit operation  

E-Print Network (OSTI)

flow heat exchanger . 2.3 Piping equipment Mixer, tee, pipe, gas pipe, valve, relief valve . 2 process compressor pump performance curve performance area, performance map . turbine driven compressor turbine performance curve motor driven variable motor turbine driven

Hong, Deog Ki

131

NERSC Franklin Hours Used Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Franklin Hours Used Franklin Hours Used Franklin Hours Used 2011 Franklin Usage in Hours 2011 Franklin Usage in Hours 2010 2010 Franklin Usage in Hours 2009 2009 Franklin Usage in Hours 2007-2008 2008 Franklin Usage in Hours 2008 Franklin Usage in Hours Date Hours Used (in thousands) Percentage of Maximum Possible (24 hours/day) 04/28/2012 0.00 0.00 04/27/2012 272.62 29.40 04/26/2012 692.81 74.71 04/25/2012 841.60 90.75 04/24/2012 53.86 5.81 04/23/2012 432.01 46.59 04/22/2012 823.23 88.77 04/21/2012 473.95 51.11 04/20/2012 173.75 18.74 04/19/2012 449.22 48.44 04/18/2012 816.23 88.02 04/17/2012 754.35 81.34 04/16/2012 648.89 69.97 04/15/2012 812.25 87.59 04/14/2012 843.46 90.95 04/13/2012 737.46 79.52 04/12/2012 711.97 76.77 04/11/2012 734.65 79.22 04/10/2012 815.65 87.95 04/09/2012 897.25 96.75

132

Unit Operational Flexibility: Low-Load Turndown of a Large Supercritical Boiler  

Science Conference Proceedings (OSTI)

Power plants must be able to match their output with system demand, which varies with the season and, more important, with the time of the day. Additionally, the variable nature of many renewable generation assets places flexibility pressure on traditional generation.BackgroundEPRI has a history of investigating off-design operation of power plants dating back more than 30 years. The issues surrounding variable pressure operation (VPO) are well understood; ...

2013-12-20T23:59:59.000Z

133

Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Federal Operational Readiness Review  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Operational Readiness Review June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 2 4.0 Results ................................................................................................................................................... 2

134

Fleet vehicles in the Unites States: composition, operating characteristics, and fueling practices  

DOE Green Energy (OSTI)

As fleets become a larger proportion of the new vehicle population on the road, they have more influence on the characteristics of the total US motor vehicle population. One of the characteristics which fleets are expected to have the most influence on is the overall vehicle fuel economy. In addition, because of the relatively large market share and the high turnover rate of fleet vehicles, fleets have been considered as a useful initial market for alternative fuel vehicles. In order to analyze fleet market potential and likely market penetration of alternative fuel vehicles and to infrastructure requirements for successful operations of these vehicles in the future, information on fleet sizes and composition, fleet vehicle operating characteristics (such as daily/annual miles of travel), fuel efficiency, and refueling practices, is essential. The purpose of this report is to gather and summarize information from the latest data sources available pertaining to fleet vehicles in the US This report presents fleet vehicle data on composition, operating characteristics, and fueling practices. The questions these data are intended to address include: (1) How are fleet vehicles operated? (2) Where are they located? and (3) What are their usual fueling practices? Since a limited number of alternative fuel fleet vehicles are already in use, data on these vehicles are also included in this report. 17 refs.

Miaou, S.P.; Hu, P.S. [Oak Ridge National Lab., TN (United States); Young, J.R. [Tennessee Univ., Knoxville, TN (United States)

1992-05-01T23:59:59.000Z

135

Fleet vehicles in the Unites States: composition, operating characteristics, and fueling practices  

DOE Green Energy (OSTI)

As fleets become a larger proportion of the new vehicle population on the road, they have more influence on the characteristics of the total US motor vehicle population. One of the characteristics which fleets are expected to have the most influence on is the overall vehicle fuel economy. In addition, because of the relatively large market share and the high turnover rate of fleet vehicles, fleets have been considered as a useful initial market for alternative fuel vehicles. In order to analyze fleet market potential and likely market penetration of alternative fuel vehicles and to infrastructure requirements for successful operations of these vehicles in the future, information on fleet sizes and composition, fleet vehicle operating characteristics (such as daily/annual miles of travel), fuel efficiency, and refueling practices, is essential. The purpose of this report is to gather and summarize information from the latest data sources available pertaining to fleet vehicles in the US This report presents fleet vehicle data on composition, operating characteristics, and fueling practices. The questions these data are intended to address include: (1) How are fleet vehicles operated (2) Where are they located and (3) What are their usual fueling practices Since a limited number of alternative fuel fleet vehicles are already in use, data on these vehicles are also included in this report. 17 refs.

Miaou, S.P.; Hu, P.S. (Oak Ridge National Lab., TN (United States)); Young, J.R. (Tennessee Univ., Knoxville, TN (United States))

1992-05-01T23:59:59.000Z

136

Remedial Action Report for Operable Units 6-05 and 10-04, Phase III  

SciTech Connect

This Phase III remedial action report addresses the remediation of lead-contaminated soils found at the Security Training Facility STF-02 Gun Range at the Idaho National Laboratory Site. Phase I, consisting of developing and implementing institutional controls at Operble Unit 10-04 sites and developing and implementing Idaho National Laboratory Site-wide plans for both institutional controls and ecological monitoring, was addressed in a previous report. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase IV will remediate hazards from unexploded ordnance.

R. P. Wells

2007-08-15T23:59:59.000Z

137

Hourly Energy Emission Factors for Electricity Generation in...  

Open Energy Info (EERE)

Hourly Energy Emission Factors for Electricity Generation in the United States

Emissions from energy use in buildings are usually estimated on an annual...

138

Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2  

Science Conference Proceedings (OSTI)

This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

NONE

1997-11-10T23:59:59.000Z

139

Analysis of Unit-Level Changes in Operations with Increased SPP Wind from EPRI/LCG Balancing Study  

DOE Green Energy (OSTI)

Wind power development in the United States is outpacing previous estimates for many regions, particularly those with good wind resources. The pace of wind power deployment may soon outstrip regional capabilities to provide transmission and integration services to achieve the most economic power system operation. Conversely, regions such as the Southeastern United States do not have good wind resources and will have difficulty meeting proposed federal Renewable Portfolio Standards with local supply. There is a growing need to explore innovative solutions for collaborating between regions to achieve the least cost solution for meeting such a renewable energy mandate. The Department of Energy funded the project 'Integrating Midwest Wind Energy into Southeast Electricity Markets' to be led by EPRI in coordination with the main authorities for the regions: SPP, Entergy, TVA, Southern Company and OPC. EPRI utilized several subcontractors for the project including LCG, the developers of the model UPLAN. The study aims to evaluate the operating cost benefits of coordination of scheduling and balancing for Southwest Power Pool (SPP) wind transfers to Southeastern Electric Reliability Council (SERC) Balancing Authorities (BAs). The primary objective of this project is to analyze the benefits of regional cooperation for integrating mid-western wind energy into southeast electricity markets. Scenarios were defined, modeled and investigated to address production variability and uncertainty and the associated balancing of large quantities of wind power in SPP and delivery to energy markets in the southern regions of the SERC. DOE funded Oak Ridge National Laboratory to provide additional support to the project, including a review of results and any side analysis that may provide additional insight. This report is a unit-by-unit analysis of changes in operations due to the different scenarios used in the overall study. It focuses on the change in capacity factors and the number of start-ups required for each unit since those criteria summarize key aspects of plant operations, how often are they called upon and how much do they operate. The primary analysis of the overall project is based on security-constrained unit commitment (SCUC) and economic dispatch (SCED) simulations of the SPP-SERC regions as modeled for the year 2022. The SCUC/SCED models utilized for the project were developed through extensive consultation with the project utility partners, to ensure the various regions and operational practices are represented as best as possible in the model. SPP, Entergy, Oglethorpe Power Company (OPC), Southern Company, and the Tennessee Valley Authority (TVA) actively participated in the project providing input data for the models and review of simulation results and conclusions. While other SERC utility systems are modeled, the listed SERC utilities were explicitly included as active participants in the project due to the size of their load and relative proximity to SPP for importing wind energy.

Hadley, Stanton W [ORNL

2012-01-01T23:59:59.000Z

140

Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Waste Management Plan  

SciTech Connect

This Waste Management Plan describes waste management and waste minimization activities for Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory. The waste management activities described in this plan support the selected response action presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13. This plan identifies the waste streams that will be generated during implementation of the remedial action and presents plans for waste minimization, waste management strategies, and waste disposition.

G. L. Schwendiman

2006-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Evaluation of potential severe accidents during low power and shutdown operations at Surry: Unit 1, Volume 1  

Science Conference Proceedings (OSTI)

This document contains a summarization of the results and insights from the Level 1 accident sequence analyses of internally initiated events, internally initiated fire and flood events, seismically initiated events, and the Level 2/3 risk analysis of internally initiated events (excluding fire and flood) for Surry, Unit 1. The analysis was confined to mid-loop operation, which can occur during three plant operational states (identified as POSs R6 and R10 during a refueling outage, and POS D6 during drained maintenance). The report summarizes the Level 1 information contained in Volumes 2--5 and the Level 2/3 information contained in Volume 6 of NUREG/CR-6144.

Chu, T.L.; Pratt, W.T. [eds.; Musicki, Z. [Brookhaven National Lab., Upton, NY (United States)

1995-10-01T23:59:59.000Z

142

CHEMICAL TECHNOLOGY DIVISION UNIT OPERATIONS SECTION MONTHLY PROGRESS REPORT, APRIL 1962  

DOE Green Energy (OSTI)

Bubble size measurements in the foam column showed that a spinnerette with 50 mu holes gave a nearly normal distribution of bubbles sizes while a coarse fritted glass gas sparger had a tail of large bubbles which did not fit the normal curve. A set of equations solvable by a finite difference technique are presented which completely describe the irreversible reaction rate of H/sub 2/ or CO with a fixed bed of CuO pellets. Radiation damage tests are in progress to evaluate plastics for the Transuranium program. All dejacketed SRE Core I U fuel slugs were reeanned and shipped to Savannah River. Installation of the shear-leach complex is complete. The shortest practical length into which a tubular fuel element assembly may be sheared appears to be 1/2 in. Tests showed difficulties with shearing assemblies containing tube sheets. The stepped shear blade used for Mark I prototype fuel elements produced chunks of porcelain filled Yankee prototypes. Flow capacities of nozzle plate pulsed columns operated under dilute Purex fiowsheet conditions were determined. Fuel pins made with compacted sol-gel ThO/sub 2/ and U/sup 235/ were irradiated without difficulty to 17,000 Mwd/t. Routine operation of the rotary denitrator to give ThO/sub 2/ product was demonstrated. (auth)

Whatley, M.E.; Haas, P.A.; Horton, R.W.; Ryon, A.D.; Suddath, J.C.; Watson, C.D.

1962-10-01T23:59:59.000Z

143

CHEMICAL TECHNOLOGY DIVISION, UNIT OPERATIONS SECTION MONTHLY PROGRESS REPORT, AUGUST 1961  

DOE Green Energy (OSTI)

Engineering studies of a 6-in.-ID countercurrent foam column were started. The capacity of Mark II Stacked Clone Contactor was found to be limited by gradually increasing entrainment. Thoria sols were prepared from trough denitrator products in a conical bottom tank agitated by circulation through an external centrifugal pump. Experimental results agreed favorably with predicted results for the reaction of CO with CuO and fur the simultaneous reactions of H/ sub 2/ and CO with CuO. In a 2-in. dissolver, Modified Zirflex dissolution rates of Zircaloy-2 increased non-linearly with F/S. The 250-ton prototype shear was received and installed. Priorities were established for development work on graphite fuels. A total of 5 SR Core I fuel clusters were mechanically dejacketed from the second carrier shipment of SRE Core I fuel. Degradation of NaK to a solid or waxy form required that the slugs be ejected by the jackscrew. The NaK disposal system operated satisfactorily for the Iast ~3000 ml of NaK. A procedure for estimating the temperature rise of spent reactor fuels during shipping gives reasonably good results. A puIse column was operated with the light phase c nt-nuous using an external phase separator. Zirconium ates were dissolved by HF in molten salt at rates at least twice as great as for Zircaloy-2 metal in the same system. Magnesium additive to high sulfate Purex waste was tested. (auth)

Whatley, M.E.; Haas, P.A.; Horton, R.W.; Ryon, A.D.; Suddath, J.C.; Watson, C.D.

1962-03-01T23:59:59.000Z

144

Incorporating Wind Generation Forecast Uncertainty into Power System Operation, Dispatch, and Unit Commitment Procedures  

DOE Green Energy (OSTI)

In this paper, an approach to evaluate the uncertainties of the balancing capacity, ramping capability, and ramp duration requirements is proposed. The approach includes three steps: forecast data acquisition, statistical analysis of retrospective information, and prediction of grid balancing requirements for a specified time horizon and a given confidence level. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on histogram analysis, incorporating sources of uncertainty of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the "flying-brick" technique is developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation process is used to validate the accuracy of the confidence intervals. To demonstrate the validity of the developed uncertainty assessment methods and its impact on grid operation, a framework for integrating the proposed methods with an EMS system is developed. Demonstration through integration with an EMS system illustrates the applicability of the proposed methodology and the developed tool for actual grid operation and paves the road for integration with EMS systems from other vendors.

Makarov, Yuri V.; Etingov, Pavel V.; Huang, Zhenyu; Ma, Jian; Subbarao, Krishnappa

2010-10-19T23:59:59.000Z

145

Incorporating Uncertainty of Wind Power Generation Forecast into Power System Operation, Dispatch, and Unit Commitment Procedures  

Science Conference Proceedings (OSTI)

An approach to evaluate the uncertainties of the balancing capacity, ramping capability, and ramp duration requirements is proposed. The approach includes three steps: forecast data acquisition, statistical analysis of retrospective information, and prediction of grid balancing requirements for a specified time horizon and a given confidence level. An assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on histogram analysis, incorporating sources of uncertainty - both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures). A new method called the 'flying-brick' technique is developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation process is used to validate the accuracy of the confidence intervals. To demonstrate the validity of the developed uncertainty assessment methods and its impact on grid operation, a framework for integrating the proposed methods with an EMS system is developed. Demonstration through EMS integration illustrates the applicability of the proposed methodology and the developed tool for actual grid operation and paves the road for integration with EMS systems in control rooms.

Makarov, Yuri V.; Etingov, Pavel V.; Ma, Jian; Huang, Zhenyu; Subbarao, Krishnappa

2011-06-23T23:59:59.000Z

146

Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Annual Status Report for Fiscal Year 2006  

SciTech Connect

This report provides a status of the progress made in Fiscal Year 2006 on tasks identified in the Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Work Plan. Major accomplishments include: (1) groundwater sampling and review of the groundwater monitoring data, (2) installation of a Sitewide groundwater-level monitoring network, (3) update of the Groundwater Monitoring and Field Sampling Plan of Operable Unit 10-08, (4) re-evaluation of the risk at Site TSF-08, (5) progress on the Operable Unit 10-08 Sitewide Groundwater Model.

R. P. Wells

2007-05-09T23:59:59.000Z

147

CHEMICAL TECHNOLOGY DIVISION UNIT OPERATIONS SECTION MONTHLY PROGRESS REPORT, OCTOBER 1958  

SciTech Connect

Tungsten and graphite are unsuitable materials of construction for a UF/ sub 6/ inlet nozzle in a continuous DRUHM reactor. Preparation of feed was completed for an extended Fluorox test. Difficulties were experienced in the operation of a fluidized bed TbNT denitrator. Flame denitration of UNH and TbNO produced mixed oxides of 1 to 14 micron mean particle size. The chloride capacity of Dowex 21K was measured, and equilibria measurements of uranium sorption from sulfate solutions were continued. Siliceous deposits in the stripping column caused the termination of a Darex run with a prototype APPR fuel element. Hot runs were begun on the chemical dejacketing of irradiated PWR blanket pins. The addition of formaldehyde to neutralize "25" waste reduced the recovery of nitrate from the calciner off-gas from 76% to 23%. (For preceding report see CF-58-9-62.) (auth)

Bresee, J.C.; Haas, P.A.; Watson, C.D.; Whatley, M.E.

1958-12-19T23:59:59.000Z

148

Public Participation Plan for Waste Area Group 7 Operable Unit 7-13/14 at the Idaho National Laboratory Site  

SciTech Connect

This Public Participation Plan outlines activities being planned to: (1) brief the public on results of the remedial investigation and feasibility study, (2) discuss the proposed plan for remediation of Operable Unit 7-13/14 with the public, and (3) encourage public participation in the decision-making process. Operable Unit 7-13/14 is the Comprehensive Remedial Investigation/Feasibility Study for Waste Area Group 7. Analysis focuses on the Subsurface Disposal Area (SDA) within the Radioactive Waste Management Complex at the Idaho National Laboratory (Site). This plan, a supplement to the Idaho National Laboratory Community Relations Plan (DOE-ID 2004), will be updated as necessary. The U.S. Department of Energy (DOE), Idaho Department of Environmental Quality (DEQ), and U.S. Environmental Protection Agency (EPA) will participate in the public involvement activities outlined in this plan. Collectively, DOE, DEQ, and EPA are referred to as the Agencies. Because history has shown that implementing the minimum required public involvement activities is not sufficient for high-visibility cleanup projects, this plan outlines additional opportunities the Agencies are providing to ensure that the public’s information needs are met and that the Agencies can use the public’s input for decisions regarding remediation activities.

B. G. Meagher

2007-07-17T23:59:59.000Z

149

Liquid Phase Methanol LaPorte Process Development Unit: Modification, operation, and support studies  

DOE Green Energy (OSTI)

A gas phase and a slurry phase radioactive tracer study was performed on the 12 ton/day Liquid Phase Methanol (LPMEOH) Process Development Unit (PDU) in LaPorte, Texas. To study the gas phase mixing characteristics, a radioactive argon tracer was injected into the feed gas and residence time distribution was generated by measuring the response at the reactor outlet. Radioactive manganese oxide powder was independently injected into the reactor to measure the slurry phase mixing characteristics. A tanks-in-series model and an axial dispersion model were applied to the data to characterize the mixing in the reactor. From the axial dispersion model, a translation to the number of CSTR's (continuous stirred tank reactors) was made for comparison purposes with the first analysis. Dispersion correlations currently available in the literature were also compared. The tanks-in-series analysis is a simpler model whose results are easily interpreted. However, it does have a few drawbacks; among them, the lack of a reliable method for scaleup of a reactor and no direct correlation between mixing in the slurry and gas phases. The dispersion model allows the mixing in the gas and slurry phases to be characterized separately while including the effects of phase transfer. This analysis offers a means for combining the gas and slurry phase dispersion models into an effective dispersion coefficient, which, in turn, can be related to an equivalent number of tanks-in-series. The dispersion methods reported are recommended for scaleup of a reactor system. 24 refs., 18 figs., 8 tabs.

Not Available

1990-08-31T23:59:59.000Z

150

Team Surpasses 1 Million Hours Safety Milestone | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Team Surpasses 1 Million Hours Safety Milestone Team Surpasses 1 Million Hours Safety Milestone Team Surpasses 1 Million Hours Safety Milestone October 30, 2013 - 12:00pm Addthis The Separations Process Research Unit Demolition Project Safety Committee meets regularly with employees and supervisors to discuss safety issues and reinforce safe work habits. The Separations Process Research Unit Demolition Project Safety Committee meets regularly with employees and supervisors to discuss safety issues and reinforce safe work habits. NISKAYUNA, N.Y. - Vigilance and dedication to safety led the EM program's disposition project team at the Separations Process Research Unit (SPRU) to achieve a milestone of one million hours - over two-and-a-half-years - without injury or illness resulting in time away from work.

151

Team Surpasses 1 Million Hours Safety Milestone | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Team Surpasses 1 Million Hours Safety Milestone Team Surpasses 1 Million Hours Safety Milestone Team Surpasses 1 Million Hours Safety Milestone October 30, 2013 - 12:00pm Addthis The Separations Process Research Unit Demolition Project Safety Committee meets regularly with employees and supervisors to discuss safety issues and reinforce safe work habits. The Separations Process Research Unit Demolition Project Safety Committee meets regularly with employees and supervisors to discuss safety issues and reinforce safe work habits. NISKAYUNA, N.Y. - Vigilance and dedication to safety led the EM program's disposition project team at the Separations Process Research Unit (SPRU) to achieve a milestone of one million hours - over two-and-a-half-years - without injury or illness resulting in time away from work.

152

CHEMICAL TECHNOLOGY DIVISION, UNIT OPERATIONS SECTION MONTHLY PROGRESS REPORT, JULY 1961  

DOE Green Energy (OSTI)

Thoria denitrator products from 0.04 to 0.066 N/Th ratio were dispersed into sols at N/Th radios of 0.11 to 0.19 and processed by the sol-gel technique to produce final compacted thoria products with little significant variation. Experimental results of H/sub 2/-CuO reaction in the helium purification work further substantiated the mathematical model. The elutions of uranyl sulfate loaded Dowex 2lK with chloride apparently involved the diffusion of both the sulfate ions and the uranyl ions. The dejacketing of the NaK bonded SRE Core I fuel elements is proceeding satisfactorily with an average rate that has increased to 7 to 8 kg U/hr. The uranium slugs exhibited various degrees of camber and pitting. The disintegration-leaching of 3% U-graphite fuel by flowing 90% HNO/sub 3/ at 60 deg C is apparently superior to a batch-leach method. Attempts to use air bubblers to control the interface level at the bottom of a 2- in.-dia glass pulse column showed considerable loss of pulse amplitude, particularly in taller columns. An air operated diaphragm pump was designed, fabricated, and tested for use as a TrU facility process pump. A successful duplicate test was made calcining TBP-25 waste using the close coupled evaporator- calciner system. (auth)

Whatley, M.E.; Haas, P.A.; Horton, R.W.; Ryon, A.D.; Suddath, J.C.; Watson, C.D.

1962-01-30T23:59:59.000Z

153

Rainfall Estimation with an Operational Polarimetric C-Band Radar in the United Kingdom: Comparison with a Gauge Network and Error Analysis  

Science Conference Proceedings (OSTI)

The estimate of rainfall using data from an operational dual-polarized C-band radar in convective storms in southeast United Kingdom is compared against a network of gauges. Four different rainfall estimators are considered: reflectivity–rain-rate ...

V. N. Bringi; M. A. Rico-Ramirez; M. Thurai

2011-10-01T23:59:59.000Z

154

An Operational System for Specifying Monthly Precipitation Amounts over the United States from the Field of Concurrent Mean 700-mb Heights  

Science Conference Proceedings (OSTI)

This paper describes an operational system for specifying monthly precipitation amounts in the contiguous United States from the concurrent 700-mb monthly mean height field over North America and adjacent oceans. Multiple regression equations are ...

William H. Klein; Hal J. Bloom

1989-03-01T23:59:59.000Z

155

Teach Yourself in 24 Hours  

E-Print Network (OSTI)

"ations .................................................. 302 Reclaiming Memory with the kill Command .................................. 303 Getting System Load in a retrieval system, or transmitted by any means, electronic, mechanical, photo- copying, recording 1 Hour 1 Preparing to Install Linux 3 2 Installing Linux 11 3 Configuring the X Window System 31

Eckmiller, Rolf

156

CHEMICAL TECHNOLOGY DIVISION, UNIT OPERATIONS SECTION MONTHLY PROGRESS REPORT FOR FEBRUARY 1959  

SciTech Connect

A gamma scintillation spectrometer was used to measure diffusivity of uranyl nitrate in water during preliminary capillary experiments. During Fluorox run FBR-22, 90.4% of the theoretical amount of UF/sub 6/ formed was collected in cold traps and chemical traps. Toroid tests of flame calcined mixed Th-U oxide showed low corrosion rates, small changes in particle size and a low solubilization of uranium, while denitration of uranyl nitrate in a fluidized bed resulted in particle growth with uniform layers of uranium oxide. A half-time of 30 min for uranium anion exchange was measured in differential bed studies of uranium sorption on Dowex 21K. The Darex Reference flowsheet operation resulted in chloride removal to less than 50 ppm in solvent extraction feed from APPR head- end treatment. Unirradiated prototype Consolidated Edison pins were dejacketed with 6 M H/sub 2/SO/sub 4/ with uranium losses to the dejacketing solution of approximately 0.2%. An optimum procedure was developed for clarifying large batches of solvent extraction feed by sand bed filtration. Sheared sections of stainless steel clad UO/sub 2/ were completely leached in onehalf the time required for equal lengths of stainless tubes containing uncrushed pellets. Abrasive disc wheel to metal removal ratios were measured at cutting rates from 10 to 60 in./min. Dissolution of Zircaloy-2 dummy fuel elements in an INOR-8 dissolver with the NaF-LiF salt system resulted in vessel wall corrosion rates of 1-2 mils/run (approximately 8 hr of HF exposure). At a heat generation rate of 60 Btu/hr/gal of solid wastes, the maximum temperature rise in a 0.75 ft radius infinite cylinder (k = 0.1 Btu/hr sq ft ction prod- F) was 1270 ction prod- F in soil, 1150 ction prod- F in rock, and 1020 ction prod- F in salt. (For preceding period see CF-59-1-74.) (auth)

Bresee, J.C.; Haas, P.A.; Watson, C.D.; Whatley, M.E.; Horton, R.W.

1959-06-11T23:59:59.000Z

157

NERSC Carver Hours Used Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Carver Hours Carver Hours Used Carver Hours Used Hopper Usage Chart Hopper Usage Chart Date Hours Used (in millions) Percent of Maximum Possible (24 hours/day) 01/05/2014 170.00 89.35 01/04/2014 174.38 91.65 01/03/2014 174.15 91.53 01/02/2014 179.72 94.45 01/01/2014 173.76 91.32 12/31/2013 172.25 90.53 12/30/2013 169.62 89.14 12/29/2013 164.72 86.57 12/28/2013 177.92 93.51 12/27/2013 171.61 90.19 12/26/2013 172.74 90.79 12/25/2013 172.13 90.46 12/24/2013 173.48 91.18 12/23/2013 174.92 91.93 12/22/2013 175.26 92.11 12/21/2013 173.58 91.23 12/20/2013 174.50 91.71 12/19/2013 170.02 89.36 12/18/2013 178.25 93.68 12/17/2013 176.17 92.59 12/16/2013 162.03 85.16 12/15/2013 157.09 82.56 12/14/2013 173.40 91.13 12/13/2013 185.02 97.24 12/12/2013 150.91 79.31 12/11/2013 31.67 16.64 12/10/2013 92.44 48.58

158

Cat.No. W306–E1–2 SYSMAC C200H-ASC11/ASC21/ASC31 ASCII Units OPERATION MANUAL C200H-ASC11/ASC21/ASC31 ASCII Units Operation Manual  

E-Print Network (OSTI)

OMRON products are manufactured for use according to proper procedures by a qualified operator and only for the purposes described in this manual. The following conventions are used to indicate and classify precautions in this manual. Always heed the information provided with them. Failure to heed precautions can result in injury to people or damage to property. DANGER Indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury. WARNING Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury. Caution Indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury, or property damage. OMRON Product References All OMRON products are capitalized in this manual. The word “Unit ” is also capitalized when it refers to an OMRON product, regardless of whether or not it appears in the proper name of the product. The abbreviation “Ch, ” which appears in some displays and on some OMRON products, often means “word ” and is abbreviated “Wd ” in documentation in this sense. The abbreviation “PC ” means Programmable Controller and is not used as an abbreviation for anything else. Visual Aids The following headings appear in the left column of the manual to help you locate different types of information. Note Indicates information of particular interest for efficient and convenient operation of the product.

unknown authors

1999-01-01T23:59:59.000Z

159

Final Hazard Categorization for the Remediation of Six 300-FF-2 Operable Unit Solid Waste Burial Grounds  

SciTech Connect

This report provides the final hazard categorization (FHC) for the remediation of six solid waste disposal sites (referred to as burial grounds) located in the 300-FF-2 Operable Unit (OU) on the Hanford Site. These six sites (618-1, 618-2, 618-3, 618-7, 618-8, and 618-13 Burial Grounds) were determined to have a total radionuclide inventory (WCH 2005a, WCH 2005d, WCH 2005e and WCH 2006b) that exceeds the DOE-STD-1027 Category 3 threshold quantity (DOE 1997) and are the subject of this analysis. This FHC document examines the hazards, identifies appropriate controls to manage the hazards, and documents the FHC and commitments for the 300-FF-2 Burial Grounds Remediation Project.

J. D. Ludowise

2006-12-12T23:59:59.000Z

160

Superfund record of decision (EPA Region 8): Anaconda Company Smelter (ARWW and S) Operable Unit, Anaconda, MT, September 29, 1998  

SciTech Connect

The US Environmental Protection Agency (EPA), with the concurrence of the State of Montana Department of Environmental Quality (MDEQ), presents this Record of Decision (ROD) for the Anaconda Regional Water, Waste, and Soils (ARWW and S) Operable Unit (OU) of the Anaconda Smelter National Priorities List (NPL) Site. The ROD is based on the Administrative Record for the ARWW and S OU, including three Remedial Investigations (RIs) and five Feasibility Study (FS) Deliverables, human health and ecological risk assessments, the Proposed Plan, the public comments received, including those from the potentially responsible party (PRP), and EPA responses. The ROD presents a brief summary of the RIs and FS Deliverables, actual and potential risks to human health and the environment, and the Selected Remedy. EPA followed the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, the National Contingency Plan (NCP), and appropriate guidance in preparation of the ROD.

NONE

1998-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Superfund record of decision (EPA Region 9): Yuma Marine Corps Air Station, Operable Unit 2, Yuma, AZ, December 2, 1997  

SciTech Connect

This Record of Decision (ROD) for Operable Unit (OU2) documents the remedial action plan for OU2 at Marine Corps Air Station (MCAS), Yuma, Arizona. On the basis of the data collected at the OU2 sites, no further action is necessary for 12 of the 18 CAOCs included in OU2, because these sites do not pose a threat to human health or the environment. However, remedial action is required to protect human health and comply with regulatory requirements at three of the CAOCs in OU2 because of the presence of ACM. Under this alternative, ACM fragment visible on soil surfaces would be collected manually. Collection would include removing approximately the upper inch of soil beneath the ACM to reduce the potential for asbestos fibers remaining behind in the soil. The ACM and soils would be stockpiled, manifested, loaded, transported, and disposed of at a permitted facility.

NONE

1998-10-01T23:59:59.000Z

162

Evaluation and Screening of Remedial Technologies for Uranium at the 300-FF-5 Operable Unit, Hanford Site, Washington  

SciTech Connect

Pacific Northwest National Laboratory (PNNL) is presently conducting a re-evaluation of remedies addressing persistent dissolved uranium concentrations in the upper aquifer under the 300 Area of the Hanford Site in southeastern Washington State. This work is being conducted as a Phase III feasibility study for the 300-FF-5 Operable Unit on behalf of the U.S. Department of Energy. As part of the feasibility study process, a comprehensive inventory of candidate remedial technologies was conducted by PNNL. This report documents the identification and screening of candidate technologies. The screening evaluation was conducted in accordance with guidance and processes specified by U.S. Environmental Protection Agency regulations associated with implementation of the Comprehensive Environmental Response, Compensation, and Liability Act process.

Nimmons, Michael J.

2007-08-01T23:59:59.000Z

163

LITERATURE SURVEY FOR GROUNDWATER TREATMENT OPTIONS FOR NITRATE IODINE-129 AND URANIUM 200-ZP-1 OPERABLE UNIT HANFORD SITE  

SciTech Connect

This literature review presents treatment options for nitrate, iodine-129, and uranium, which are present in groundwater at the 200-ZP-I Groundwater Operable Unit (OU) within the 200 West Area of the Hanford Site. The objective of this review is to determine available methods to treat or sequester these contaminants in place (i.e., in situ) or to pump-and-treat the groundwater aboveground (i.e., ex situ). This review has been conducted with emphasis on commercially available or field-tested technologies, but theoretical studies have, in some cases, been considered when no published field data exist. The initial scope of this literature review included only nitrate and iodine-I 29, but it was later expanded to include uranium. The focus of the literature review was weighted toward researching methods for treatment of nitrate and iodine-129 over uranium because of the relatively greater impact of those compounds identified at the 200-ZP-I OU.

BYRNES ME

2008-06-05T23:59:59.000Z

164

Field Sampling Plan for the Operable Units 6-05 and 10-04 Remedial Action, Phase IV  

SciTech Connect

This Field Sampling Plan outlines the collection and analysis of samples in support of Phase IV of the Waste Area Group 10, Operable Units 6-05 and 10-04 remedial action. Phase IV addresses the remedial actions to areas with the potential for unexploded ordnance at the Idaho National Laboratory Site. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. The remedial action consists of removal and disposal of ordnance by high-order detonation, followed by sampling to determine the extent, if any, of soil that might have been contaminated by the detonation activities associated with the disposal of ordnance during the Phase IV activities and explosives during the Phase II activities.

R. Wells

2006-11-14T23:59:59.000Z

165

Feasibility study for remedial action for the Quarry Residuals Operable Unit at the Weldon Spring Site, Weldon Spring, Missouri  

SciTech Connect

The U.S. Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, which is located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis (Figure 1.1). Cleanup of the Weldon Spring site consists of several integrated components. The quarry residuals operable unit (QROU) is one of four operable units being evaluated. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, a remedial investigation/feasibility study (RI/FS) is being conducted to evaluate conditions and potential responses for the following areas and/or media that constitute the QROU: (1) the residual material (soil and sediment) remaining at the Weldon Spring quarry after removal of the bulk waste (about 11 million L [3 million gal] of uranium-contaminated ponded water was also addressed previous to bulk waste removal); (2) other media located in the surrounding vicinity of the quarry, including adjacent soil, surface water, and sediment in Femme Osage Slough and several creeks; and (3) quarry groundwater located primarily north of Femme Osage Slough. Potential impacts to the St. Charles County well field downgradient of the quarry area are also being addressed as part of QROU RI/FS evaluations. For remedial action sites, it is DOE policy to integrate values associated with the National Environmental Policy Act (NEPA) into the CERCLA decision-making process. The analyses contained herein address NEPA values as appropriate to the actions being considered for the QROU. A work plan summarizing initial site conditions and providing conceptual site hydrogeological and exposure models was published in January 1994. The RI and baseline risk assessment (BRA) reports have been completed. The RI discusses in detail the nature and extent and the fate and transport of contamination at the quarry area.

NONE

1998-03-01T23:59:59.000Z

166

Remedial Investigation/Feasibility Study Work Plan for the 200-UP-1 Groundwater Operable Unit, Hanford Site, Richland, Washington. Revision  

Science Conference Proceedings (OSTI)

This work plan identifies the objectives, tasks, and schedule for conducting a Remedial Investigation/Feasibility Study for the 200-UP-1 Groundwater Operable Unit in the southern portion of the 200 West Groundwater Aggregate Area of the Hanford Site. The 200-UP-1 Groundwater Operable Unit addresses contamination identified in the aquifer soils and groundwater within its boundary, as determined in the 200 West Groundwater Aggregate Area Management Study Report (AAMSR) (DOE/RL 1992b). The objectives of this work plan are to develop a program to investigate groundwater contaminants in the southern portion of the 200 West Groundwater Aggregate Area that were designated for Limited Field Investigations (LFIs) and to implement Interim Remedial Measures (IRMs) recommended in the 200 West Groundwater AAMSR. The purpose of an LFI is to evaluate high priority groundwater contaminants where existing data are insufficient to determine whether an IRM is warranted and collect sufficient data to justify and implement an IRM, if needed. A Qualitative Risk Assessment (QRA) will be performed as part of the LFI. The purpose of an IRM is to develop and implement activities, such as contaminant source removal and groundwater treatment, that will ameliorate some of the more severe potential risks of groundwater contaminants prior to the RI and baseline Risk Assessment (RA) to be conducted under the Final Remedy Selection (FRS) at a later date. This work plan addresses needs of a Treatability Study to support the design and implementation of an interim remedial action for the Uranium-{sup 99}{Tc}-Nitrate multi-contaminant IRM plume identified beneath U Plant.

Not Available

1994-01-01T23:59:59.000Z

167

An Hourly Assimilation–Forecast Cycle: The RUC  

Science Conference Proceedings (OSTI)

The Rapid Update Cycle (RUC), an operational regional analysis–forecast system among the suite of models at the National Centers for Environmental Prediction (NCEP), is distinctive in two primary aspects: its hourly assimilation cycle and its use ...

Stanley G. Benjamin; Dezsö Dévényi; Stephen S. Weygandt; Kevin J. Brundage; John M. Brown; Georg A. Grell; Dongsoo Kim; Barry E. Schwartz; Tatiana G. Smirnova; Tracy Lorraine Smith; Geoffrey S. Manikin

2004-02-01T23:59:59.000Z

168

hourly data | OpenEI  

Open Energy Info (EERE)

data data Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. Source U.S. National Renewable Energy Laboratory (NREL) Date Released May 03rd, 2005 (9 years ago) Date Updated November 01st, 2007 (7 years ago) Keywords DNI GHI hourly data NREL solar Sri Lanka SWERA TILT TMY UNEP Data application/zip icon Download TMY data (zip, 67.5 MiB)

169

Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1: Main text  

Science Conference Proceedings (OSTI)

This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

NONE

1996-06-01T23:59:59.000Z

170

New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation, Operable Unit 1-07B  

Science Conference Proceedings (OSTI)

This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

Nelson, L. O.

2007-06-12T23:59:59.000Z

171

Predicting hourly building energy usage  

SciTech Connect

This article presents the results of an evaluation to identify the most accurate method for making hourly energy use predictions. The prediction of energy usage by HVAC systems is important for the purposes of HVAC diagnostics, system control, parameter and system identification, optimization and energy management. Many new techniques are now being applied to the analysis problems involved with predicting the future behavior of HVAC systems and deducing properties of these systems. Similar problems arise in most observational disciplines, including physics, biology and economics.

Kreider, J.F. (Univ. of Colorado, Boulder, CO (United States). Dept. of Civil, Environmental and Architectural Engineering); Haberl, J.S. (Texas A and M Univ., College Station, TX (United States). Mechanical Engineering Dept.)

1994-06-01T23:59:59.000Z

172

Estimation of Daily Degree-hours  

Science Conference Proceedings (OSTI)

Degree-hours have many applications in fields such as agriculture, architecture, and power generation. Since daily mean temperatures are more readily available than hourly temperatures, the difference between mean daily degree-hours computed from ...

Nathaniel B. Guttman; Richard L. Lehman

1992-07-01T23:59:59.000Z

173

SRNL PHASE 1 ASSESSMENT OF THE WAC/DQO AND UNIT OPERATIONS FOR THE WTP WASTE QUALIFICATION PROGRAM  

SciTech Connect

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is currently transitioning its emphasis from a design and construction phase toward start-up and commissioning. With this transition, the WTP Project has initiated more detailed assessments of the requirements related to actual processing of the Hanford Site tank waste. One particular area of interest is the waste qualification program to be implemented to support the WTP. Given the successful implementation of similar waste qualification efforts at the Savannah River Site (SRS), based on critical technical support and guidance from the Savannah River National Laboratory (SRNL), WTP requested the utilization of subject matter experts from SRNL to support a technology exchange to perform a review of the WTP waste qualification program, discuss the general qualification approach at SRS, and to identify critical lessons learned through the support of DWPF's sludge batch qualification efforts. As part of Phase 1, SRNL subject matter experts in critical technical and/or process areas reviewed specific WTP waste qualification information. The Phase 1 review was a collaborative, interactive, and iterative process between the two organizations. WTP provided specific analytical procedures, descriptions of equipment, and general documentation as baseline review material. SRNL subject matter experts reviewed the information and, as appropriate, requested follow-up information or clarification to specific areas of interest. This process resulted in multiple teleconferences with key technical contacts from both organizations resolving technical issues that lead to the results presented in this report. This report provides the results of SRNL's Phase 1 review of the WAC-DQO waste acceptance criteria and processability parameters, and the specific unit operations which are required to support WTP waste qualification efforts. The review resulted in SRNL providing concurrence, alternative methods, or gap identification for the proposed WTP analytical methods or approaches. For the unit operations, the SRNL subject matter experts reviewed WTP concepts compared to what is used at SRS and provided thoughts on the outlined tasks with respect to waste qualification. Also documented in this report are recommendations and an outline on what would be required for the next phase to further mature the WTP waste qualification program.

Peeler, D.; Adamson, D.; Bannochie, C.; Cozzi, A.; Eibling, R.; Hay, M.; Hansen, E.; Herman, D.; Martino, C.; Nash, C.; Pennebaker, F.; Poirier, M.; Reboul, S.; Stone, M.; Taylor-Pashow, K.; White, T.; Wilmarth, B.

2012-05-16T23:59:59.000Z

174

Use of GTE-65 gas turbine power units in the thermal configuration of steam-gas systems for the refitting of operating thermal electric power plants  

SciTech Connect

Thermal configurations for condensation, district heating, and discharge steam-gas systems (PGU) based on the GTE-65 gas turbine power unit are described. A comparative multivariant analysis of their thermodynamic efficiency is made. Based on some representative examples, it is shown that steam-gas systems with the GTE-65 and boiler-utilizer units can be effectively used and installed in existing main buildings during technical refitting of operating thermal electric power plants.

Lebedev, A. S.; Kovalevskii, V. P. ['Leningradskii Metallicheskii Zavod', branch of JSC 'Silovye mashiny' (Russian Federation); Getmanov, E. A.; Ermaikina, N. A. ['Institut Teploenergoproekt', branch of JSC 'Inzhenernyi tsentr EES' (Russian Federation)

2008-07-15T23:59:59.000Z

175

Waste Area Group 10, Operable Unit 10-08, Annual Monitoring Status Report for Fiscal Year 2009  

Science Conference Proceedings (OSTI)

This report documents the status of Fiscal Year 2009 groundwater monitoring performed in Waste Area Group 10 at the U.S. Department of Energy Idaho National Laboratory Site, as identified in the Groundwater Monitoring and Field Sampling Plan for Operable Unit 10-08. Twelve of the fourteen required wells were sampled, and all ten required intervals from the Westbay wells were sampled. Two wells were not sampled because they were in the process of being converted into multiple-sample-interval Westbay wells by the U.S. Geological Survey. Groundwater samples were analyzed for volatile organic compounds identified on the Contract Laboratory Program target analyte list as well as metals (filtered), anions, and radionuclides (i.e., I-129, tritium, Tc-99, gross alpha, gross beta, and Sr-90). No contaminant exceeded maximum contaminant levels in wells along the southern boundary of the Idaho National Laboratory Site or in guard wells. Iron was above its secondary maximum contaminant level of 300 ug/L in one well. The cause of the elevated iron concentration is uncertain. Lead was detected just below its action level. However, the zinc concentration was also elevated in these wells, and the source of the lead is probably galvanized riser pipe in the wells. Once the galvanized pipe is replaced, both lead and zinc concentrations should decline, as has been observed at other Waste Area Group 10 wells.

Howard Forsythe

2010-02-04T23:59:59.000Z

176

Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

Not Available

1994-03-01T23:59:59.000Z

177

Abstract--The seven Independent System Operators and Regional Transmission Organizations (ISO/RTOs) in the United  

E-Print Network (OSTI)

. REFERENCES [1] United States Department of Energy, "Smart grid," available at: http://www.oe.energy.gov/smartgrid

McCalley, James D.

178

Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Remedial Design/Remedial Action Work Plan  

SciTech Connect

This Remedial Design/Remedial Action Work Plan provides the framework for defining the remedial design requirements, preparing the design documentation, and defining the remedial actions for Waste Area Group 3, Operable Unit 3-13, Group 3, Other Surface Soils, Remediation Sets 4-6 (Phase II) located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory. This plan details the design developed to support the remediation and disposal activities selected in the Final Operable Unit 3-13, Record of Decision.

D. E. Shanklin

2006-06-01T23:59:59.000Z

179

MODELING TRANSPORT IN THE DOWN GRADIENT PORTION OF THE 200-PO-1 OPERABLE UNIT AT THE HANFORD SITE  

SciTech Connect

Remedial Investigations are underway for the 200-PO-l Operable Unit (OU) at the U.S. Department of Energy's Hanford Site in Washington State. To support the baseline risk assessment and evaluation of remedial alternatives, fate and transport modeling is being conducted to predict the future concentration of contaminants of potential concern in the 200-PO-1 OU. This study focuses on modeling the 'down gradient' transport of those contaminants that migrate beyond the 3-D model domain selected for performing detailed 'source area' modeling within the 200-PO-1 OU. The down gradient portion is defined as that region of the 200-PO-1 OU that is generally outside the 200 Area (considered 'source area') of the Hanford Site. A 1-D transport model is developed for performing down gradient contaminant fate and transport modeling. The 1-D transport model is deemed adequate based on the inferred transport pathway of tritium in the past and the observation that most of the contaminant mass remains at or near the water table within the unconfined aquifer of the Hanford Formation and the Cold-Creek/Pre-Missoula Gravel unit. The Pipe Pathway feature of the GoldSim software is used to perform the calculations. The Pipe Pathway uses a Laplace transform approach to provide analytical solutions to a broad range of advection-dominated mass transport systems involving one-dimensional advection, longitudinal dispersion, retardation, decay and ingrowth, and exchanges with immobile storage zones. Based on the historical concentration distribution data for the extensive tritium plume in this area, three Pipe Pathways are deemed adequate for modeling transport of contaminants. Each of these three Pipe Pathways is discretized into several zones, based on the saturated thickness variation in the unconfined aquifer and the location of monitoring wells used for risk assessment calculation. The mass fluxes of contaminants predicted to exit the source area model domain are used as an input to the down gradient model, while the flow velocities applied are based on the present-day hydraulic gradients and estimation of hydraulic conductivity in the unconfined aquifer. The results of the calculation indicate that the future concentrations of contaminants of potential concern in the down gradient portion of the 200-PO-1 OU declines with time and distance.

MEHTA S; ALY AH; MILLER CW; MAYENNA A

2009-12-03T23:59:59.000Z

180

Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 1. Main text  

SciTech Connect

This is the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include {sup 137}Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and {sup 137}Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River.

NONE

1995-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1, main text  

SciTech Connect

This document is the combined Remedial Investigation/Feasibility Study (RI/FS) Report for the Clinch River/Poplar Creek Operable Unit (CR/PC OU), an off-site OU associated with environmental restoration activities at the U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR). As a result of past, present, and potential future releases of hazardous substances into the environment, the ORR was placed on the National Priorities List in December 1989 (54 FR 48184). Sites on this list must be investigated for possible remedial action, as required by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, 42 U.S.C. 9601, et seq.). This report documents the findings of the remedial investigation of this OU and the feasibility of potential remedial action alternatives. These studies are authorized by Sect. 117 of CERCLA and were conducted in accordance with the requirements of the National Contingency Plan (40 CFR Part 300). DOE, the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC) have entered into a Federal Facility Agreement (FFA), as authorized by Sect. 120 of CERCLA and Sects. 3008(h) and 6001 of the Resource Conservation and Recovery Act (RCRA) (42 U.S.C. 6901, et seq.). The purpose of this agreement is to ensure a coordinated and effective response for all environmental restoration activities occurring at the ORR. In addition to other responsibilities, the FFA parties mutually define the OU boundaries, set remediation priorities, establish remedial investigation priorities and strategies, and identify and select remedial actions. A copy of this FFA is available from the DOE Information Resource Center in Oak Ridge, Tennessee.

NONE

1996-03-01T23:59:59.000Z

182

Draft final feasibility study report and proposed plan for Operable Unit 4, response to comments: Fernald Environmental Management Project, Fernald, Ohio  

SciTech Connect

This report contains questions and comments regarding a risk evaluation and possible remedial action of Operable Unit 4 at the Feed Materials Production Center at Fernald, Ohio. Attention is focused on the US EPA Region V feasibility study and on the CRARE. The CRARE is a post-remediation time frame document.

Not Available

1994-02-01T23:59:59.000Z

183

Advanced Gas Turbine Guidelines: Performance Retention for GE 7F Unit in Peaking Operation: Durability Surveillance at Potomac Elect ric Power Company's Station H  

Science Conference Proceedings (OSTI)

Worldwide pressures to reduce power generation costs have encouraged domestic and foreign manufacturers to build high-efficiency gas turbines implementing the latest technological advances. To assure the staying power of these turbines, EPRI launched a multi-year durability surveillance program. This report discusses performance monitoring and analysis of a General Electric 7F unit in peaking operation.

1999-04-26T23:59:59.000Z

184

Conceptual design study on incorporating a 25-ton/day pyrolysis unit into an operating total energy system. Final report  

DOE Green Energy (OSTI)

The results of a conceptual design study on incorporating a pyrolysis unit into an existing total energy plant are presented. The objectives of this study were to examine the institutional, technical and economic factors affecting the incorporation of a 25-ton/day pyrolysis unit into the Indian Creek Total Energy Plant. The Indian Creek total energy plant is described. Results of the conceptual design are presented. A survey of the availability of waste materials and a review of health and safety ordinances are included. The technical aspects of the pyrolysis system are discussed, including the results of the review of facilities requirements for the pyrolysis unit, the analysis of necessary system modification, and an estimate of the useful energy contribution by the pyrolysis unit. Results of the life-cycle cost analysis of the pyrolysis unit are presented. The major conclusions are that: there appears to be no institutional or technical barriers to constructing a waste pyrolysis unit at the Indian Creek Total Energy Plant; pyrolysis gas can be consumed in the engines and the boilers by utilizing venturi mixing devices; the engines can consume only 5% of the output of the 25-ton/day pyrolysis unit; Therefore, consumption of pyrolysis gas will be controlled by boiler energy demand patterns; a waste pyrolysis unit is not cost effective at the current natural gas price of $0.90/10/sup 6/ Btu; and pyrolysis is economically attractive at natural gas prices above $3.00/10/sup 6/ Btu.

None

1976-12-13T23:59:59.000Z

185

Superfund Record of Decision (EPA Region 8): Anaconda Smelter site, (Operable Unit 11 - Flue Dust), Deer Lodge County, Anaconda, MT. (Second remedial action), September 1991  

Science Conference Proceedings (OSTI)

The 6,000-acre Anaconda Smelter site is a former copper and ore processing facility in Deer Lodge County, Montana. Land use in the area is predominantly residential. The site is bounded on the north and east, respectively, by the Warm Springs Creek and Mill Creek, both of which are potential sources of drinking water. From 1884 until 1980 when activities ceased, the site was used for ore processing and smelting operations. In 1988, EPA conducted an investigation to determine the nature and extent of the flue dust contamination. A 1988 ROD addressed the Mill Creek Operable Unit (OU15) and documented the relocation of residents from the community surrounding the smelter site as the selected remedial action. The Record of Decision (ROD) addresses the Flue Dust Operable Unit (OU11). The primary contaminants of concern affecting this site from the flue dust materials are metals including arsenic, cadmium, and lead. The selected remedial action for the site is included.

Not Available

1991-09-23T23:59:59.000Z

186

Baseline risk assessment for groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are evaluating conditions in groundwater and springs at the DOE chemical plant area and the DA ordnance works area near Weldon Spring, Missouri. The two areas are located in St. Charles County, about 48 km (30 mi) west of St. Louis. The 88-ha (217-acre) chemical plant area is chemically and radioactively contaminated as a result of uranium-processing activities conducted by the U.S. Atomic Energy Commission in the 1950s and 1960s and explosives-production activities conducted by the U.S. Army (Army) in the 1940s. The 6,974-ha (17,232-acre) ordnance works area is primarily chemically contaminated as a result of trinitrotoluene (TNT) and dinitrotoluene (DNT) manufacturing activities during World War II. This baseline risk assessment (BRA) is being conducted as part of the remedial investigation/feasibility study (RUFS) required under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended. The purpose of the BRA is to evaluate potential human health and ecological impacts from contamination associated with the groundwater operable units (GWOUs) of the chemical plant area and ordnance works area. An RI/FS work plan issued jointly in 1995 by the DOE and DA (DOE 1995) analyzed existing conditions at the GWOUs. The work plan included a conceptual hydrogeological model based on data available when the report was prepared; this model indicated that the aquifer of concern is common to both areas. Hence, to optimize further data collection and interpretation efforts, the DOE and DA have decided to conduct a joint RI/BRA. Characterization data obtained from the chemical plant area wells indicate that uranium is present at levels slightly higher than background, with a few concentrations exceeding the proposed U.S. Environmental Protection Agency (EPA) maximum contaminant level (MCL) of 20 {micro}g/L (EPA 1996c). Concentrations of other radionuclides (e.g., radium and thorium) were measured at back-ground levels and were eliminated from further consideration. Chemical contaminants identified in wells at the chemical plant area and ordnance works area include nitroaromatic compounds, metals, and inorganic anions. Trichloroethylene (TCE) and 1,2-dichloroethylene (1,2 -DCE) have been detected recently in a few wells near the raffinate pits at the chemical plant.

NONE

1999-07-14T23:59:59.000Z

187

The Autocorrelation of Hourly Wind Speed Observations  

Science Conference Proceedings (OSTI)

The autocorrelation of hourly wind speed observations is estimated for seven stations on the west coast of Canada at selected lags ranging from one hour to two months. The estimated autocorrelation function is fitted by a model that includes a ...

Arthur C. Brett; Stanton E. Tuller

1991-06-01T23:59:59.000Z

188

ARM - NSA Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Images Information for Guest Scientists Contacts NSA Operations Barrow Facility Instrumentation at the Barrow facility operates 7 days a week, 24 hours a day, year around. The...

189

Virtualizing office hours in CS 50  

Science Conference Proceedings (OSTI)

In Fall 2007, we introduced "virtual office hours" into Harvard College's introductory computer science course, CS 50, so that students could meet with teaching fellows (TFs) online to discuss problem sets at any hour from anywhere. Our goals were to ... Keywords: CSCW, collaboration, distance education, virtual office hours

David J. Malan

2009-07-01T23:59:59.000Z

190

United Technologies Corporation: Internal Audit Department (IAD) Case Study: A Case Study of the UTC ACE Operating System  

E-Print Network (OSTI)

This study of United Technologies Corporation's Internal Audit Department (IAD) examines how stability and change are important factors in how this department functions and improves. IAD is a leader in the adoption of ...

Roth, George

2008-08-11T23:59:59.000Z

191

Report of 1,000 Hour Catalyst Longevity Evaluation  

DOE Green Energy (OSTI)

This report presents the results of a 1,000 hour, high-pressure, catalyst longevity test for the decomposition of concentrated sulfuric acid. The reaction is used for both the sulfur-iodine (S-I) cycle and hybrid sulfur cycle. By the time of the delivery date of April 17, 2009, for project milestone no. 2NIN07TC050114, the 1% Pt/TiO2 catalyst had been in the reaction environment for 658 hours. During the first 480 hours of testing, the catalyst activity provided stable, near-equilibrium yields of 46.8% SO2 and 22.8% O2. However, product yields declined at sample exposure times >480 hours. At 658 hours of operation, catalyst activity (based on oxygen yield) declined to 57% relative to the stable period of catalyst activity. Thus, as of April 17, this catalyst did not provide the desired stability level of <10% degradation per 1,000 hours. The experiment was terminated on April 27, after 792 hours, when a fitting failed and the catalyst was displaced from the reactor such that the sample could not be recovered. Oxygen conversion at the end of the experiment was 12.5% and declining, suggesting that at that point, catalyst activity had decreased to 54% of the initial level.

Daniel M. Ginosar

2009-06-01T23:59:59.000Z

192

Analysis of Sub-Hourly Ramping Impacts of Wind Energy and Balancing Area Size: Preprint  

DOE Green Energy (OSTI)

In this paper, we analyze sub-hourly ramping requirements and the benefit of combining Balancing Authority operations with significant wind penetrations.

Milligan, M.; Kirby, B.

2008-06-01T23:59:59.000Z

193

Multi-Microgrids Reliability and Islanding Operation Enhancement, under Different Dispatchable-Renewable DG Units Penetration Levels.  

E-Print Network (OSTI)

??Electrical reliability assurance is a very important aspect of electrical power systems; significant consideration should be given to reliability at both the planning and operation… (more)

Essam Abdelkhalek Abdelaty, Mohammed

2012-01-01T23:59:59.000Z

194

Superfund record of decision (EPA Region 3): Aberdeen Proving Ground, Carroll Island, Edgewood Area Operable Unit A, Aberdeen Proving Ground, MD, September 30, 1996  

SciTech Connect

This Record of Decision (ROD) document presents the selected remedial action to reduce the risks posed by the disposal pits/areas in 13 sites and Areas of Concern (AOCs) located at Carroll Island in the Edgewood Area of APG, Maryland. The major components of the selected remedy for Operable Unit A include hand excavation of the waste in the disposal pits/areas and segregation and disposal or treatment of excavated waste.

NONE

1996-10-01T23:59:59.000Z

195

Record of Decision Remedial Alternative Selection for the Fire Department Hose Training Facility (904-113G) Operable Unit  

Science Conference Proceedings (OSTI)

This decision document presents the selected remedial alternative for the FDHTF located at the SRS in Aiken, South Carolina. The selected alternative was developed in accordance with RCRA, CERCLA, as amended, and to the extent practicable, the National Oil and Hazardous Substances Pollution Contingency Plan. This decision is based on the Administrative Record File for this specific RCRA/CERCLA unit.

Palmer, E.

1999-02-10T23:59:59.000Z

196

Performance and operation of a crosslinked polymer flood at Sage Spring Creek Unit A, Natrona County, Wyoming  

Science Conference Proceedings (OSTI)

This paper reviews field geology and development, characterizes the reservoir, evaluates secondary performance, and describes the design and benefits of a polymer program. Performance of the Sage Spring Creek Unit A confirms a high flood efficiency and superior oil recovery. The sweep improvement program is a technical and economic success.

Mack, J.C.; Warren, J.

1984-07-01T23:59:59.000Z

197

Shutdown and low-power operation at commercial nuclear power plants in the United States. Final report  

Science Conference Proceedings (OSTI)

The report contains the results of the NRC Staff`s evaluation of shutdown and low-power operations at US commercial nuclear power plants. The report describes studies conducted by the staff in the following areas: Operating experience related to shutdown and low-power operations, probabilistic risk assessment of shutdown and low-power conditions and utility programs for planning and conducting activities during periods the plant is shut down. The report also documents evaluations of a number of technical issues regarding shutdown and low-power operations performed by the staff, including the principal findings and conclusions. Potential new regulatory requirements are discussed, as well as potential changes in NRC programs. A draft report was issued for comment in February 1992. This report is the final version and includes the responses to the comments along with the staff regulatory analysis of potential new requirements.

Not Available

1993-09-01T23:59:59.000Z

198

Regional operations research program for development of geothermal energy in the Southwest United States. Second quarterly report  

DOE Green Energy (OSTI)

Continuation of efforts by the Core and State Teams in data acquisition, electric and non-electric economic studies, and development of computer support functions and operations is described.

Marlin, J.M.

1978-01-01T23:59:59.000Z

199

Operational Flexibility Implementation: Case Study #3: Extreme Turndown of a Coal-Fired Drum-Type Unit  

Science Conference Proceedings (OSTI)

BackgroundThe case study presented in this report is the third in a series that examines the variety of challenges that electric utilities face in trying to improve flexibility in the operational performance of their generation assets. Each case is unique in both the performance goals that are sought by the utility and the equipment and operational limitations that are present.ObjectiveTo reduce the minimum achievable power level ...

2013-11-21T23:59:59.000Z

200

Feasibility study for remedial action for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri  

SciTech Connect

The U.S. Department of Energy (DOE) and the U.S. Department of Army (DA) are conducting an evaluation to identify the appropriate response action to address groundwater contamination at the Weldon Spring Chemical Plant (WSCP) and the Weldon Spring Ordnance Works (WSOW), respectively. The two areas are located in St. Charles County, about 48 km (30 rni) west of St. Louis. The groundwater operable unit (GWOU) at the WSCP is one of four operable units being evaluated by DOE as part of the Weldon Spring Site Remedial Action Project (WSSRAP). The groundwater operable unit at the WSOW is being evaluated by the DA as Operable Unit 2 (OU2); soil and pipeline contamination are being managed under Operable Unit 1 (OU1). Remedial activities at the WSCP and the WSOW are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. A remedial investigation/feasibility study (RI/FS) work plan summarizing initial site conditions and providing site hydrogeological and exposure models was published in August of 1995 (DOE 1995). The remedial investigation (RI) and baseline risk assessment (BRA) have also recently been completed. The RI (DOE and DA 1998b) discusses in detail the nature, extent, fate, and transport of groundwater and spring water contamination. The BRA (DOE and DA 1998a) is a combined baseline assessment of potential human health and ecological impacts and provides the estimated potential health risks and ecological impacts associated with groundwater and springwater contamination if no remedial action were taken. This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP and the WSOW. A brief description of the history and environmental setting of the sites is presented in Section 1.1, key information relative to the nature and extent of contamination is presented in Section 1.2, and the results of the BRA are summarized in Section 1.3. The objective of this FS is discussed in Section 1.4, and preliminary remediation goals are identified in Section 1.5. The organization of the remaining chapters of this FS is outlined in Section 1.6.

NONE

1999-07-15T23:59:59.000Z

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Design and operational considerations of United States commercial near-surface low-level radioactive waste disposal facilities  

Science Conference Proceedings (OSTI)

In accordance with the Low-Level Radioactive Waste Policy Amendments Act of 1985, states are responsible for providing for disposal of commercially generated low-level radioactive waste (LLW) within their borders. LLW in the US is defined as all radioactive waste that is not classified as spent nuclear fuel, high-level radioactive waste, transuranic waste, or by-product material resulting from the extraction of uranium from ore. Commercial waste includes LLW generated by hospitals, universities, industry, pharmaceutical companies, and power utilities. LLW generated by the country`s defense operations is the responsibility of the Federal government and its agency, the Department of Energy. The commercial LLRW disposal sites discussed in this report are located near: Sheffield, Illinois (closed); Maxey Flats, Kentucky (closed); Beatty, Nevada (closed); West Valley, New York (closed); Barnwell, South Carolina (operating); Richland, Washington (operating); Ward Valley, California, (proposed); Sierra Blanca, Texas (proposed); Wake County, North Carolina (proposed); and Boyd County, Nebraska (proposed). While some comparisons between the sites described in this report are appropriate, this must be done with caution. In addition to differences in climate and geology between sites, LLW facilities in the past were not designed and operated to today`s standards. This report summarizes each site`s design and operational considerations for near-surface disposal of low-level radioactive waste. The report includes: a description of waste characteristics; design and operational features; post closure measures and plans; cost and duration of site characterization, construction, and operation; recent related R and D activities for LLW treatment and disposal; and the status of the LLW system in the US.

Birk, S.M.

1997-10-01T23:59:59.000Z

202

Superfund record of decision (EPA Region 1): Otis Air National Guard (USAF), Operable Unit 3, Falmouth, MA, September 30, 1998  

SciTech Connect

The Massachusetts Military Reservation (MMR) on Cape Cod, Massachusetts, lies within the boundaries of the towns of Falmouth, Mashpee, Sandwich, and Bourne. The Area of Contamination (AOC) known as Chemical Spill 3 United States Coast Guard (CS-3 (USCG)) is located on Lee Road, in the south central portion of the MMR. The Air Force Center for Environmental Excellence (AFCEE) Installation Restoration Program Office at Otis Air National Guard (ANG) Base, Massachusetts.

1999-03-01T23:59:59.000Z

203

Accelerating Computation of the Unit Commitment Problem (Presentation)  

SciTech Connect

Production cost models (PCMs) simulate power system operation at hourly (or higher) resolution. While computation times often extend into multiple days, the sequential nature of PCM's makes parallelism difficult. We exploit the persistence of unit commitment decisions to select partition boundaries for simulation horizon decomposition and parallel computation. Partitioned simulations are benchmarked against sequential solutions for optimality and computation time.

Hummon, M.; Barrows, C.; Jones, W.

2013-10-01T23:59:59.000Z

204

Microsoft Word - Final Update 6 - UNits 345.DOC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 to: 6 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant Modeling Baseload Units 3,4,5 ENSR Corporation January 13, 2006 Document Number 10350-002-420 (Update 6) January, 2006 1-1 1.0 INTRODUCTION This report describes dispersion modeling performed for simultaneous operation of three baseload units at Mirant's Potomac River Generating Station (PRGS). The units (3,4,5) would operate at maximum load (107 MW) for up to 12 hours and minimum load (35 MW) 12 hours or more in a calendar day. This mode of operation is also referred to as Option B in Mirant Potomac River LLC's December 30, 2005 letter to the U.S. Department of Energy regarding District of Columbia Public Service Commission, Docket No. EO-05-01. The modeling was performed according to the Protocol

205

Regional operations research program for development of geothermal energy in the Southwest United States; third quarterly report  

DOE Green Energy (OSTI)

Continuation of efforts in data acquistion, electric and non-electric economic studies, development of computer support functions and operations, and preparation of geothermal development scenarios are described. Temperature data used in economic analysis and scenario development are given in an appendix as are the details of a revised economic model.

Marlin, J.M.

1978-04-01T23:59:59.000Z

206

100-BC-5 Operable Unit, Batch Leach Analyses and Report for Sediments at RI/FS Wells C7508, C7783, C7784, C7785, and C7787  

SciTech Connect

This is an analytical data report for sediment samples from the 100 BC Operable unit. This report contains the updated dates for samples associated with Hexavalent Chromium/Soil analysis. Between August 24, 2010 and March 3, 2011 sediment samples were received from 100-BC Decision Unit Soil for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

Lindberg, Michael J.

2011-04-01T23:59:59.000Z

207

DOE KSU EV Site Operator Program. [United States Department of Energy (DOE) Kansas State University (KSU) Electric Vehicle (EV)  

SciTech Connect

Kansas State University, with funding from federal, state, public, and private companies, is participating in the DOE Electric Vehicle Site Operator Program. Kansas State is demonstrating, testing, and evaluating electric of hybrid vehicle technology. This will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four(4) electric cars during the first two years of this five-year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort station wagons. This quarter's report describes ongoing public relations activities and meetings as well as presenting performance data for the electric vehicles. (GHH)

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1992-01-01T23:59:59.000Z

208

DOE KSU EV Site Operator Program. [United States Department of Energy (DOE) Kansas State University (KSU) Electric Vehicle (EV)  

DOE Green Energy (OSTI)

Kansas State University, with funding from federal, state, public, and private companies, is participating in the DOE Electric Vehicle Site Operator Program. Kansas State is demonstrating, testing, and evaluating electric of hybrid vehicle technology. This will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four(4) electric cars during the first two years of this five-year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort station wagons. This quarter's report describes ongoing public relations activities and meetings as well as presenting performance data for the electric vehicles. (GHH)

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1992-01-01T23:59:59.000Z

209

Design and operating experience of an ac-dc power converter for a superconducting magnetic energy storage unit  

DOE Green Energy (OSTI)

The design philosophy and the operating behavior of a 5.5 kA, +-2.5 kV converter, being the electrical interface between a high voltage transmission system and a 30 MJ superconducting coil, are documented in this paper. Converter short circuit tests, load tests under various control conditions, dc breaker tests for magnet current interruption, and converter failure modes are described.

Boenig, H.J.; Nielsen, R.G.; Sueker, K.H.

1984-01-01T23:59:59.000Z

210

The Relationships between Network Lightning Surface and Hourly Observations of Thunderstorms  

Science Conference Proceedings (OSTI)

Relationships were established between lightning location data and surface hourly observations of thunderstorms for 132 stations in the northeastern United States. The relationships are based on statistics derived from 2 × 2 contingency tables ...

Ronald M. Reap; Richard E. Orville

1990-01-01T23:59:59.000Z

211

Improved Quality Assurance for Historical Hourly Temperature and Humidity: Development and Application to Environmental Analysis  

Science Conference Proceedings (OSTI)

Historical hourly surface synoptic (airways) meteorological reports from around the United States have been digitized as part of the NOAA Climate Database Modernization Program. An important component is improvement of quality assurance ...

Daniel Y. Graybeal; Arthur T. DeGaetano; Keith L. Eggleston

2004-11-01T23:59:59.000Z

212

Data Quality Objectives Summary Report - Designing a Groundwater Monitoring Network for the 200-BP-5 and 200-PO-1 Operable Units  

SciTech Connect

This document presents the results of a series of interviews held with technical, management, and regulatory staff to determine the groundwater data quality objectives (DQOs) for monitoring activities associated with the 200-BP-5 and 200-PO-1 operable units located in the Hanford Site 200 East Area. This assessment is needed to address changing contaminant plume conditions (e.g., plume migration) and to ensure that monitoring activities meet the requirements for performance monitoring as prescribed by the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), Resource Conservation and Recovery Act of 1976 (RCRA) past practice, and Atomic Energy Act of 1954 (AEA) regulatory requirements and orders.

Thornton, Edward C.; Lindberg, Jon W.

2002-09-30T23:59:59.000Z

213

Safety Evaluation Report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). Supplement No. 12  

Science Conference Proceedings (OSTI)

Supplement No. 12 to the Safety Evaluation Report for the application filed by the Tennessee Valley Authority for license to operate Watts Bar Nuclear Plant, Units 1 and 2, Docket Nos. 50-390 and 50-391, located in Rhea County, Tennessee, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation of (1) additional information submitted by the applicant since Supplement No. 11 was issued, and (2) matters that the staff had under review when Supplement No. 11 was issued.

Tam, P.S.

1993-10-01T23:59:59.000Z

214

Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1. Analysis of core damage frequency from internal events for plant operational state 5 during a refueling outage. Internal events appendices K to M  

Science Conference Proceedings (OSTI)

This report provides supporting documentation for various tasks associated with the performance of the probabilistic risk assessment for Plant Operational State 5 (approximately Cold Shutdown as defined by Grand Gulf Technical Specifications) during a refueling outage at Grand Gulf, Unit 1 as documented in Volume 2, Part 1 of NUREG/CR-6143. The report contains the following appendices: K - HEP Locator Files; L - Supporting Information for the Plant Damage State Analysis; M - Summary of Results from the Coarse Screening Analysis - Phase 1A.

Forester, J.; Yakle, J.; Walsh, B. [Science Applications International Corp., Albuquerque, NM (United States); Darby, J. [Science and Engineering Associates, Inc., Albuquerque, NM (United States); Whitehead, D.; Staple, B.; Brown, T. [Sandia National Labs., Albuquerque, NM (United States)

1994-07-01T23:59:59.000Z

215

Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Main report and appendices, Volume 6, Part 1  

SciTech Connect

Traditionally, probabilistic risk assessments (PRAS) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Recent studies and operational experience have, however, implied that accidents during low power and shutdown could be significant contributors to risk. In response to this concern, in 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The program consists of two parallel projects being performed by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). The program objectives include assessing the risks of severe accidents initiated during plant operational states other than full power operation and comparing the estimated risks with the risk associated with accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program is that of a Level-3 PRA. The subject of this report is the PRA of the Grand Gulf Nuclear Station, Unit 1. The Grand Gulf plant utilizes a 3833 MWt BUR-6 boiling water reactor housed in a Mark III containment. The Grand Gulf plant is located near Port Gibson, Mississippi. The regime of shutdown analyzed in this study was plant operational state (POS) 5 during a refueling outage, which is approximately Cold Shutdown as defined by Grand Gulf Technical Specifications. The entire PRA of POS 5 is documented in a multi-volume NUREG report (NUREG/CR-6143). The internal events accident sequence analysis (Level 1) is documented in Volume 2. The Level 1 internal fire and internal flood analyses are documented in Vols 3 and 4, respectively.

Brown, T.D.; Kmetyk, L.N.; Whitehead, D.; Miller, L. [Sandia National Labs., Albuquerque, NM (United States); Forester, J. [Science Applications International Corp., Albuquerque, NM (United States); Johnson, J. [GRAM, Inc., Albuquerque, NM (United States)

1995-03-01T23:59:59.000Z

216

Environmental, safety, and health plan for the remedial investigation of Waste Area Grouping 10, Operable Unit 3, at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

This document outlines the environmental, safety, and health (ES&H) approach to be followed for the remedial investigation of Waste Area Grouping (WAG) 10 at Oak at Ridge National Laboratory. This ES&H Plan addresses hazards associated with upcoming Operable Unit 3 field work activities and provides the program elements required to maintain minimal personnel exposures and to reduce the potential for environmental impacts during field operations. The hazards evaluation for WAG 10 is presented in Sect. 3. This section includes the potential radiological, chemical, and physical hazards that may be encountered. Previous sampling results suggest that the primary contaminants of concern will be radiological (cobalt-60, europium-154, americium-241, strontium-90, plutonium-238, plutonium-239, cesium-134, cesium-137, and curium-244). External and internal exposures to radioactive materials will be minimized through engineering controls (e.g., ventilation, containment, isolation) and administrative controls (e.g., procedures, training, postings, protective clothing).

Not Available

1993-10-01T23:59:59.000Z

217

Bradbury Science Museum announces winter opening hours  

NLE Websites -- All DOE Office Websites (Extended Search)

Bradbury Science Museum winter hours Bradbury Science Museum winter hours Bradbury Science Museum announces winter opening hours Museum will be closed on Christmas Day (December 25) and New Year's Day (January 1, 2011). December 21, 2010 Bradbury Science Museum Bradbury Science Museum Contact Communications Office (505) 667-7000 Often called "a window to the Laboratory," the museum annually attracts thousands of visitors from all over the world. LOS ALAMOS, New Mexico, December 21, 2010-Los Alamos National Laboratory's Bradbury Science Museum will be closed on Christmas Day (December 25) and New Year's Day (January 1, 2011). On all other days, the museum will observe regular opening hours: from 10 a.m. to 5 p.m. Tuesdays to Saturdays, and from 1 to 5 p.m. Sundays and Mondays. Often called "a window to the Laboratory," the museum annually attracts

218

Superfund Record of Decision (EPA Region 9): Sacramento Army Depot, Operable Unit 4, Sacramento, CA. (Third remedial action), September 1992  

Science Conference Proceedings (OSTI)

The 485-acre Sacramento Army Depot (SAAD) site is a military facility in Sacramento County, California. Land use in the area is predominantly commercial and light industrial, with wetlands in the vicinity of several oxidation lagoons. The estimated 56,398 people who live within 2 to 3 miles of the site use municipal water as their drinking water supply. From 1950 to 1972, the lagoons received mostly industrial waste water from metal plating processes and domestic wastewater. The selected remedial action for the site includes excavating and treating approximately 15,500 cubic yards of contaminated soil onsite using soil washing; dewatering and then backfilling the treated soil onsite in the excavation areas, and storing the rinsate temporarily in onsite holding tanks for recycling; treating rinsate from the treatment process using chemical precipitation, clarification/flocculation, and chemical coagulation to remove metals, prior to discharge into the sanitary sewer; dewatering the sludge containing the precipitated metals, and stabilizing this if necessary, followed by disposal in an RCRA landfill or recovery at an offsite reclamation unit. The estimated present worth cost for this remedial action is $5,020,000. There are no O M costs associated with the remedial action.

Not Available

1992-09-30T23:59:59.000Z

219

United States Department of Energy`s electric and hybrid vehicle site operator program. Final report, April 1991--September 1996  

DOE Green Energy (OSTI)

Drivers in San Juan County, which, is comprised of islands making for short distances on rural (low speed limits) roads, found that present day electric vehicle technology can work in certain applications. An honest, accurate appraisal of the expectations of the vehicle is essential. When needs and capabilities are able to match up, then successful ownership and operation can occur. Today`s EV technology can accomplish certain driving tasks. Careful, honest analysis what is expected of the car can lead to a rewarding EV driving experience. Providing recharge locations in the community proved essential of the peace of mind of the EV driver. Since heating and air conditioning represent electric loads whose reduces range, a moderate to warm year round climate is best for today`s EV. Also, even limited solar recharging has been determined to improve battery pack life.

NONE

1997-11-06T23:59:59.000Z

220

Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODs) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regimes, which are labeled as integrator OUs. This remedial investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the feasibility study to evaluate all probable or likely alternatives.

Not Available

1993-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Remedial Investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODS) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regime`s, which are labeled as integrator OUs. This Remedial Investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the Feasibility Study to evaluate all probable or likely alternatives.

Not Available

1993-09-01T23:59:59.000Z

222

Impact of Wind Energy on Hourly Load Following Requirements: An Hourly and Seasonal Analysis; Preprint  

Science Conference Proceedings (OSTI)

The impacts of wind energy on the power system grid can be decomposed into several time scales that include regulation, load following, and unit commitment. Techniques for evaluating the impacts on these time scales are still evolving, and as wind energy becomes a larger part of the electricity supply, valuable experience will be gained that will help refine these methods. Studies that estimated the impact of wind in the load following time scale found differing results and costs, ranging from near zero to approximately $2.50/megawatt-hour (MWh). Part of the reason for these differences is the different interpretation of the impacts that would be allocated to this ancillary service. Because of the low correlation between changes in load and wind, long-term analyses of the load following impact of wind may find low impacts. During the daily load cycle, there is a tremendous variability in load following requirements in systems without wind. When significant levels of wind generation are added to the resource mix, relatively small changes in wind output can complicate the task of balancing the system during periods of large load swings. This paper analyzes the load following impacts of wind by segregating these critical time periods of the day and separating the analysis by season. The analysis compares wind generation at geographically dispersed sites to wind generation based primarily at a single site, and for a large penetration of wind (more than 20% wind capacity to peak load).

Krich, A.; Milligan, M.

2005-05-01T23:59:59.000Z

223

Superfund record of decision (EPA Region 1): Otis Air National Guard (USAF), Operable Unit 5, Falmouth, MA, September 30, 1998  

SciTech Connect

This decision document presents the Air Force Center for Environmental Excellence (AFCEE) selected remedial action decisions for contaminant source areas at the following Areas of Contamination (AOCs) at the Massachusetts Military Reservation (MMR) in Barnstable County on Cape Cod, Massachusetts: Fire Training Area No. 2 and Landfill No. 2 (FTA-2/LF-2); Petroleum Fuels Storage Area, Fuel Spill No. 10, and Fuel Spill No. 11 (PFSA/FS-10/FS-11); Storm Drainage Ditch No. 2, Fuel Spill No. 6, and Fuel Spill No. 8 (SD-2/FS-6/FS-8); Storm Drainage Ditch No. 2, Fire Training Area No. 3, and Coal Storage Yard No. 4 (SF-3/FTA-3/CY-4); Storm Drainage Ditch No. 4 (SD-4); and Storm Drainage Ditch No. 5 and Fuel Spill No. 5 (SD-5/FS-5). The selected remedy for AOC FTA-2/LF-2 is Biosparging with Ambient Air Monitoring. This remedial action is a source control action that addresses leaching of organic compounds to groundwater, the principal known threat at AOC FTA-2/LF-2. It consists of designing, constructing, and operating a biosparging treatment system, maintaining institutional controls, and five-year reviews of remedy protectiveness. The remedy reduces the release of contaminants from subsurface soils by treating subsurface soils to meet protective cleanup levels.

NONE

1999-03-01T23:59:59.000Z

224

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV  

Science Conference Proceedings (OSTI)

This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

R. P. Wells

2006-11-14T23:59:59.000Z

225

Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Supporting MELCOR calculations, Volume 6, Part 2  

SciTech Connect

To gain a better understanding of the risk significance of low power and shutdown modes of operation, the Office of Nuclear Regulatory Research at the NRC established programs to investigate the likelihood and severity of postulated accidents that could occur during low power and shutdown (LP&S) modes of operation at commercial nuclear power plants. To investigate the likelihood of severe core damage accidents during off power conditions, probabilistic risk assessments (PRAs) were performed for two nuclear plants: Unit 1 of the Grand Gulf Nuclear Station, which is a BWR-6 Mark III boiling water reactor (BWR), and Unit 1 of the Surry Power Station, which is a three-loop, subatmospheric, pressurized water reactor (PWR). The analysis of the BWR was conducted at Sandia National Laboratories while the analysis of the PWR was performed at Brookhaven National Laboratory. This multi-volume report presents and discusses the results of the BWR analysis. The subject of this part presents the deterministic code calculations, performed with the MELCOR code, that were used to support the development and quantification of the PRA models. The background for the work documented in this report is summarized, including how deterministic codes are used in PRAS, why the MELCOR code is used, what the capabilities and features of MELCOR are, and how the code has been used by others in the past. Brief descriptions of the Grand Gulf plant and its configuration during LP&S operation and of the MELCOR input model developed for the Grand Gulf plant in its LP&S configuration are given.

Kmetyk, L.N.; Brown, T.D. [Sandia National Labs., Albuquerque, NM (United States)

1995-03-01T23:59:59.000Z

226

Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1. Volume 5: Analysis of core damage frequency from seismic events during mid-loop operations  

SciTech Connect

In 1989 the US Nuclear Regulatory Commission (NRC) initiated an extensive program to examine carefully the potential risks during low-power and shutdown operations. The program included two parallel projects, one at Brookhaven National Laboratory studying a pressurized water reactor (Surry Unit 1) and the other at Sandia National Laboratories studying a boiling water reactor (Grand Gulf). Both the Brookhaven and Sandia projects have examined only accidents initiated by internal plant faults--so-called ``internal initiators.`` This project, which has explored the likelihood of seismic-initiated core damage accidents during refueling shutdown conditions, is complementary to the internal-initiator analyses at Brookhaven and Sandia. This report covers the seismic analysis at Surry Unit 1. All of the many systems modeling assumptions, component non-seismic failure rates, and human error rates that were used in the internal-initiator study at Surry have been adopted here, so that the results of the two studies can be as comparable as possible. Both the Brookhaven study and this study examine only two shutdown plant operating states (POSs) during refueling outages at Surry, called POS 6 and POS 10, which represent mid-loop operation before and after refueling, respectively. This analysis has been limited to work analogous to a level-1 seismic PRA, in which estimates have been developed for the core-damage frequency from seismic events during POSs 6 and 10. The results of the analysis are that the core-damage frequency of earthquake-initiated accidents during refueling outages in POS 6 and POS 10 is found to be low in absolute terms, less than 10{sup {minus}6}/year.

Budnitz, R.J. [Future Resources Associates, Inc., Berkeley, CA (United States); Davis, P.R. [PRD Consulting (United States); Ravindra, M.K.; Tong, W.H. [EQE International, Inc., Irvine, CA (United States)

1994-08-01T23:59:59.000Z

227

Derivation of 24-Hour Average SO2, Background for the Update 1 Report |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Derivation of 24-Hour Average SO2, Background for the Update 1 Derivation of 24-Hour Average SO2, Background for the Update 1 Report Derivation of 24-Hour Average SO2, Background for the Update 1 Report Docket No. EO-05-01. As supporting documentation for "Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant: Modeling Unit 1 Emissions in a Cycling Mode" this memo documents the fact that the observed 24-hour SO2 background concentrations during periods when meteorological conditions produce the highest impacts from Unit 1. Derivation of 24-Hour Average SO2, Background for the Update 1 Report More Documents & Publications Review of the ENSR Report Titled "Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant"

228

Storing hydroelectricity to meet peak-hour demand  

Science Conference Proceedings (OSTI)

This paper reports on pumped storage plants which have become an effective way for some utility companies that derive power from hydroelectric facilities to economically store baseload energy during off-peak hours for use during peak hourly demands. According to the Electric Power Research Institute (EPRI) in Palo Alto, Calif., 36 of these plants provide approximately 20 gigawatts, or about 3 percent of U.S. generating capacity. During peak-demand periods, utilities are often stretched beyond their capacity to provide power and must therefore purchase it from neighboring utilities. Building new baseload power plants, typically nuclear or coal-fired facilities that run 24 hours per day seven days a week, is expensive, about $1500 per kilowatt, according to Robert Schainker, program manager for energy storage at the EPRI. Schainker the that building peaking plants at $400 per kilowatt, which run a few hours a day on gas or oil fuel, is less costly than building baseload plants. Operating them, however, is more expensive because peaking plants are less efficient that baseload plants.

Valenti, M.

1992-04-01T23:59:59.000Z

229

Report for Batch Leach Analyses on Sediments at 100-KR-4 Operable Unit, Boreholes C7684, C7688, and C7695  

Science Conference Proceedings (OSTI)

This is a data report for sediment samples received by CHPRC from the 100-KR-4 OU. Between December 17, 2010 and February 17, 2011 sediment samples were received from 100-KR-4 Operable Unit for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

Lindberg, Michael J.

2011-03-01T23:59:59.000Z

230

Aquifer Testing Recommendations for Well 299-W15-225: Supporting Phase I of the 200-ZP-1 Groundwater Operable Unit Remedial Design  

Science Conference Proceedings (OSTI)

Aquifer characterization needs are currently being assessed to optimize pump-and-treat remedial strategies within the 200-ZP-1 Operable Unit (OU), specifically for the immediate area of the 241-TX-TY Tank Farm. Currently, 14 extraction wells are actively used in the Interim Record of Decision ZP-1 pump-and-treat system to remediate the existing groundwater contamination within this general area. Four of these wells (299-W15-40, 299-W15-43, 299-W15-44, and 299-W15-765) are targeted to remediate contamination within the immediate 241-TX-TY Tank Farm area. The major contaminant of concern (COC) for the 200-ZP-1 OU is carbon tetrachloride. Other COC’s include total chromium (trivalent [III] and hexavalent [VI], nitrate, trichloroethlyene, iodine-129, technetium-99, and tritium.

Spane, Frank A.; Newcomer, Darrell R.

2009-03-10T23:59:59.000Z

231

hourly solar radiation | OpenEI  

Open Energy Info (EERE)

solar radiation solar radiation Dataset Summary Description (Abstract): A need for predicting hourly global radiation exists for many locations particularly in Bangladesh for which measured values are not available and daily values have to be estimated from sunshine data. The CPRG model has been used to predict values of hourly Gh for Dhaka (23.770N, 90.380E), Chittagong (22.270N, 91.820E) and Bogra (24.850N, 89.370E) for = ±7.50, ±22.50, ±37.50, ±52.50, ±67.50, ±82.50 and ±97.50 i.e., for ±1/2, ±3/2, ±5/2, ±7/2, ±9/2, ±11/2, ±13/2 hours before and after solar noon and the computed values for Source Renewable Energy Research Centre Date Released October 22nd, 2003 (11 years ago) Date Updated Unknown Keywords Bangladesh documentation hourly solar radiation SWERA

232

Life of a Six-Hour Hurricane  

Science Conference Proceedings (OSTI)

Hurricane Claudette developed from a weak vortex in 6 h as deep convection shifted from downshear into the vortex center, despite ambient vertical wind shear exceeding 10 m s?1. Six hours later it weakened to a tropical storm, and 12 h after the ...

Kay L. Shelton; John Molinari

2009-01-01T23:59:59.000Z

233

RESULTS FROM ANALYSIS OF THE FIRST AND SECOND STRIP EFFLUENT COALESCER ELEMENTS FROM RADIOACTIVE OPERATIONS OF THE MODULAR CAUSTIC-SIDE SOLVENT EXTRACTION UNIT  

Science Conference Proceedings (OSTI)

The coalescer elements for the Strip Effluent (SE) acid within the Modular Caustic-Side Solvent Extraction Unit (MCU) experienced elevated differential pressure drop during radioactive operations. Following the end of operations for the first Macrobatch campaign and soon after start of the second Macrobatch campaign, personnel removed the coalescer media and provided to Savannah River National Laboratory (SRNL) for diagnostic investigation of the causes of reduced flow. This report summarizes those studies. Two Strip Effluent (SE) coalescers were delivered to the Savannah River National Laboratory (SRNL). One was removed from the Modular Caustic-Side Solvent Extraction Unit (MCU) between processing of Macrobatch 1 and 2 (coalescer 'Alpha'), and the second was removed from MCU after processing of {approx}24,000 gallons of salt solution (coalescer 'Beta'). Both coalescers underwent the same general strip acid flush program to reduce the dose and were delivered to SRNL for analysis of potential occluding solids. Analysis of Coalescer Alpha indicates the presence of aluminum hydroxide solids and aluminosilicate solids, while analysis of Coalescer Beta indicates the presence of aluminum hydroxide solids, but no aluminosilicates. Leaching studies on sections of both coalescers were performed. The results indicate that the coalescers had different amounts of solids present on them at the time of removal. Finally, samples of free liquids retrieved from both coalescers indicate no excessive amounts of CSSX solvent present. Given the strip acid flushing that occurred in the SE coalescers, the solids we detected on the coalescers are probably indicative of a larger quantity of these solids present before the strip acid flushing. Under this scenario, the excessive pressure drops are due to the solids and not from organic fouling.

Peters, T.; Fondeur, F.; Fink, S.

2011-06-28T23:59:59.000Z

234

NERSC Edison Phase I Hours Used Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Edison Phase I Hours Used Edison Phase I Hours Used Edison Phase I Hours Used Edison Usage Chart Edison Usage Chart Date Hours Used (in millions) Percent of Maximum Possible (24 hours/day) 06/23/2013 0.226 88.6 06/22/2013 0.239 93.9 06/21/2013 0.248 97.1 06/20/2013 0.240 94.0 06/19/2013 0.233 91.3 06/18/2013 0.245 96.0 06/17/2013 0.251 98.4 06/16/2013 0.243 95.3 06/15/2013 0.245 95.9 06/14/2013 0.246 96.5 06/13/2013 0.240 94.1 06/12/2013 0.128 50.4 06/11/2013 0.215 84.5 06/10/2013 0.225 88.4 06/09/2013 0.228 89.6 06/08/2013 0.225 88.3 06/07/2013 0.121 47.5 06/06/2013 0.223 87.4 06/05/2013 0.250 98.0 06/04/2013 0.234 91.6 06/03/2013 0.218 85.5 06/02/2013 0.246 96.4 06/01/2013 0.230 90.0 05/31/2013 0.215 84.5 05/30/2013 0.212 83.1 05/29/2013 0.223 87.3 05/28/2013 0.237 93.0 05/27/2013 0.226 88.5 05/26/2013 0.229 89.9

235

Rigorous Kinetic Modeling, Optimization, and Operability Studies of a Modified Claus Unit for an Integrated Gasification Combined Cycle (IGCC) Power Plant with CO{sub 2} Capture  

Science Conference Proceedings (OSTI)

The modified Claus process is one of the most common technologies for sulfur recovery from acid gas streams. Important design criteria for the Claus unit, when part of an Integrated Gasification Combined Cycle (IGCC) power plant, are the ability to destroy ammonia completely and the ability to recover sulfur thoroughly from a relatively low purity acid gas stream without sacrificing flame stability. Because of these criteria, modifications to the conventional process are often required, resulting in a modified Claus process. For the studies discussed here, these modifications include the use of a 95% pure oxygen stream as the oxidant, a split flow configuration, and the preheating of the feeds with the intermediate pressure steam generated in the waste heat boiler (WHB). In the future, for IGCC plants with CO{sub 2} capture, the Claus unit must satisfy emission standards without sacrificing the plant efficiency in the face of typical disturbances of an IGCC plant, such as rapid change in the feed flow rates due to load-following and wide changes in the feed composition because of changes in the coal feed to the gasifier. The Claus unit should be adequately designed and efficiently operated to satisfy these objectives. Even though the Claus process has been commercialized for decades, most papers concerned with the modeling of the Claus process treat the key reactions as equilibrium reactions. Such models are validated by manipulating the temperature approach to equilibrium for a set of steady-state operating data, but they are of limited use for dynamic studies. One of the objectives of this study is to develop a model that can be used for dynamic studies. In a Claus process, especially in the furnace and the WHB, many reactions may take place. In this work, a set of linearly independent reactions has been identified, and kinetic models of the furnace flame and anoxic zones, WHB, and catalytic reactors have been developed. To facilitate the modeling of the Claus furnace, a four-stage method was devised so as to determine which set of linearly independent reactions would best describe the product distributions from available plant data. Various approaches are taken to derive the kinetic rate expressions, which are either missing in the open literature or found to be inconsistent. A set of plant data is used for optimal estimation of the kinetic parameters. The final model agrees well with the published plant data. Using the developed kinetics models of the Claus reaction furnace, WHB, and catalytic stages, two optimization studies are carried out. The first study shows that there exists an optimal steam pressure generated in the WHB that balances hydrogen yield, oxygen demand, and power generation. In the second study, it is shown that an optimal H{sub 2}S/SO{sub 2} ratio exists that balances single-pass conversion, hydrogen yield, oxygen demand, and power generation. In addition, an operability study has been carried out to examine the operating envelope in which both the H{sub 2}S/SO{sub 2} ratio and the adiabatic flame temperature can be controlled in the face of disturbances typical for the operation of an IGCC power plant with CO{sub 2} capture. Impact of CO{sub 2} capture on the Claus process has also been discussed.

Jones, Dustin; Bhattacharyya, Debangsu; Turton, Richard; Zitney, Stephen E

2011-12-15T23:59:59.000Z

236

Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 3: Appendixes E and F -- Risk assessment information  

Science Conference Proceedings (OSTI)

This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

NONE

1996-06-01T23:59:59.000Z

237

Remedial investigation/feasibility study of the Clinch River/Poplar Creek Operable Unit. Volume 3. Risk assessment information. Appendixes E, F  

Science Conference Proceedings (OSTI)

This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is Volume 3 of the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

NONE

1996-03-01T23:59:59.000Z

238

Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.

Not Available

1993-08-01T23:59:59.000Z

239

Post-Closure Monitoring Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Effluent Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

The Area 12 Fleet Operations Steam Cleaning Effluent site is located in the southeastern portion of the Area 12 Camp at the Nevada Test Site. This site is identified in the Federal Facility Agreement and Consent Order (1996) as Corrective Action Site (CAS) 12-19-01 and is the only CAS assigned to Corrective Action Unit (CAU) 339. Post-closure sampling and inspection of the site were completed on March 27, 2002. Post-closure monitoring activities were scheduled biennially (every two years) in the Post-Closure Monitoring Plan provided in the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Effluent, Nevada Test Site (U.S. Department of Energy, Nevada Operations Office [DOEN], 1997). A baseline for the site was established by sampling in 1997. Based on the recommendations from the 1999 post-closure monitoring report (DOE/NV, 1999), samples were collected in 2000, earlier than originally proposed, because the 1999 sample results did not provide the expected decrease in total petroleum hydrocarbon (TPH) concentrations at the site. Sampling results from 2000 (DOE/NV, 2000) and 2001 (DOE/NV, 2001) revealed favorable conditions for natural degradation at the CAU 339 site, but because of differing sample methods and heterogeneity of the soil, data results from 2000 and later were not directly correlated with previous results. Post-closure monitoring activities for 2002 consisted of the following: (1) Soil sample collection from three undisturbed plots (Plots A, B, and C, Figure 2). (2) Sample analysis for TPH as oil and bio-characterization parameters (Comparative Enumeration Assay [CEA] and Standard Nutrient Panel [SNP]). (3) Site inspection to evaluate the condition of the fencing and signs. (4) Preparation and submittal of the Post-Closure Monitoring Report.

K. B. Campbell

2002-09-01T23:59:59.000Z

240

Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor Docket No. EO-05-01: Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor, March 2002 to November 2004, showing the model overprediction Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor More Documents & Publications Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Answer of Potomac Electric Power Company and PJM lnterconnection, L.L.C. to the October 6, 2005 motion filed by the Virginia Department of Environmental Quality Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Commercial and Residential Hourly Load Data Now Available on OpenEI! |  

Open Energy Info (EERE)

Commercial and Residential Hourly Load Data Now Available on OpenEI! Commercial and Residential Hourly Load Data Now Available on OpenEI! Home > Groups > Utility Rate Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 building load building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL I am pleased to announce that simulated hourly residential and commercial building load datasets are now available on OpenEI. These datasets are available for all TMY3 locations in the United States. They contain hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). In addition to various

242

Commercial and Residential Hourly Load Profiles for all TMY3 Locations in  

Open Energy Info (EERE)

and Residential Hourly Load Profiles for all TMY3 Locations in and Residential Hourly Load Profiles for all TMY3 Locations in the United States Dataset Summary Description This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types by location. Hourly load profiles are available for over all TMY3 locations in the United States here. Browse files in this dataset, accessible as individual files and as commercial and residential downloadable ZIP files. This dataset is approximately 4.8GiB compressed or 19GiB uncompressed. July 2nd, 2013 update: Residential High and Low load files have been updated from 366 days in a year for leap years to the more general 365 days in a normal year.

243

Wetland survey of the X-10 Bethel Valley and Melton Valley groundwater operable units at Oak Ridge National Labortory Oak Ridge, Tennessee  

SciTech Connect

Executive Order 11990, Protection of Wetlands, (May 24, 1977) requires that federal agencies avoid, to the extent possible, adverse impacts associated with the destruction and modification of wetlands and that they avoid direct and indirect support of wetlands development when there is a practicable alternative. In accordance with Department of Energy (DOE) Regulations for Compliance with Floodplains and Wetlands Environmental Review Requirements (Subpart B, 10 CFR 1022.11), surveys for wetland presence or absence were conducted in both the Melton Valley and the Bethel Valley Groundwater Operable Units (GWOU) on the DOE Oak Ridge Reservation (ORR) from October 1994 through September 1995. As required by the Energy and Water Development Appropriations Act of 1992, wetlands were identified using the criteria and methods set forth in the Wetlands Delineation Manual (Army Corps of Engineers, 1987). Wetlands were identified during field surveys that examined and documented vegetation, soils, and hydrologic evidence. Most of the wetland boundary locations and wetland sizes are approximate. Boundaries of wetlands in Waste Area Grouping (WAG) 2 and on the former proposed site of the Advanced Neutron Source in the upper Melton Branch watershed were located by civil survey during previous wetland surveys; thus, the boundary locations and areal sizes in these areas are accurate. The wetlands were classified according to the system developed by Cowardin et al. (1979) for wetland and deepwater habitats of the United States. A total of 215 individual wetland areas ranging in size from 0.002 ha to 9.97 ha were identified in the Bethel Valley and Melton Valley GWOUs. The wetlands are classified as palustrine forested broad-leaved deciduous (PFO1), palustrine scrub-shrub broad-leaved deciduous (PSS1), and palustrine persistent emergent (PEM1).

Rosensteel, B.A.

1996-03-01T23:59:59.000Z

244

Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water Electrolysis Production  

NLE Websites -- All DOE Office Websites (Extended Search)

Hour-by-Hour Cost Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water Electrolysis Production Genevieve Saur (PI), Chris Ainscough (Presenter), Kevin Harrison, Todd Ramsden National Renewable Energy Laboratory January 17 th , 2013 This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Acknowledgements * This work was made possible by support from the U.S. Department of Energy's Fuel Cell Technologies Office within the Office of Energy Efficiency and Renewable Energy (EERE). http://www.eere.energy.gov/topics/hydrogen_fuel_cells.html * NREL would like to thank our DOE Technology Development Managers for this project, Sara Dillich, Eric Miller, Erika Sutherland, and David Peterson. * NREL would also like to acknowledge the indirect

245

A solid oxide fuel cell power system: 1992--1993 field operation  

DOE Green Energy (OSTI)

Westinghouse has deployed fully integrated, automatically controlled, packaged solid oxide fuel cell (SOFC) power generation systems in order to obtain useful customer feedback. Recently, Westinghouse has deployed 20 kW class natural gas fueled SOFC generator modules integrated into two 25 kW SOFC systems, the first with The UTILITIES, a Japanese consortium. The UTILITIES 25 kW SOFC system is the focus of this paper. The unit was shipped to the Rokko Island Test Center for Advanced Energy Systems (near Kobe, Japan) operated by Kansai Electric Power Co.; testing was initiated February 1992. Module A operated for 2601 hours at an ave output 16.6 kW dc; final shutdown was induced by current stability problems with dissipator (restart not possible because of damaged cells). Module B operated for 1579 hours at ave output 17.8 kWdc. The unit was damaged by operation at excessively high fuel utilization > 91%. It was rebuilt and returned to Rokko Island. This module B2 operated for 1843 hours on PNG; shutdown was cuased by air supply failure. After a new blower and motor were installed July 1993, the system was restarted August 5, 1993 and operated continuously until November 10, 1993, when an automatic shutdown was induced as part of a MITI licensing inspection. After restart, the unit passed 6000 hours of operation on desulfurized PNG on January 25, 1994. Westinghouse`s future plans are outlined.

Veyo, S.E. [Westinghouse Electric Corp., Pittsburgh, PA (United States). Science and Technology Center; Kusunoki, A.; Takeuchi, S. [Kansai Electric Power Co., Inc., Osaka (Japan); Kaneko, S. [Tokyo Gas Co. Ltd. (Japan); Yokoyama, H. [Osaka Gas Co. Ltd. (Japan)

1994-05-01T23:59:59.000Z

246

Remedial investigation work plan for Chestnut Ridge Operable Unit 4 (Rogers Quarry/Lower McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

The Oak Ridge Y-12 Plant includes - 800 acres near the northeast comer of the reservation and adjacent to the city of Oak Ridge (Fig. 1-1). The plant is a manufacturing and developmental engineering facility that produced components for various nuclear weapons systems and provides engineering support to other Energy Systems facilities. More than 200 contaminated sites have been identified at the Y-12 Plant that resulted from past waste management practices. Many of the sites have operable units (OUs) based on priority and on investigative and remediation requirements. This Remedial Investigation RI work plan specifically addresses Chestnut Ridge OU 4. Chestnut Ridge OU 4 consists of Rogers Quarry and Lower McCoy Branch (MCB). Rogers Quarry, which is also known as Old Rogers Quarry or Bethel Valley Quarry was used for quarrying from the late 1940s or early 1950s until about 1960. Since that time, the quarry has been used for disposal of coal ash and materials from Y-12 production operations, including classified materials. Disposal of coal ash ended in July 1993. An RI is being conducted at this site in response to CERCLA regulations. The overall objectives of the RI are to collect data necessary to evaluate the nature and extent of contaminants of concern, support an Ecological Risk Assessment and a Human Health Risk Assessment, support the evaluation of remedial alternatives, and ultimately develop a Record of Decision for the site. The purpose of this work plan is to outline RI activities necessary to define the nature and extent of suspected contaminants at Chestnut Ridge OU 4. Potential migration pathways also will be investigated. Data collected during the RI will be used to evaluate the risk posed to human health and the environment by OU 4.

Not Available

1993-09-01T23:59:59.000Z

247

Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1. Volume 5: Analysis of core damage frequency from seismic events for plant operational state 5 during a refueling outage  

SciTech Connect

In 1989 the US Nuclear Regulatory Commission (NRC) initiated an extensive program to examine carefully the potential risks during low-power and shutdown operations. The program included two parallel projects, one at Sandia National Laboratories studying a boiling water reactor (Grand Gulf), and the other at Brookhaven National Laboratory studying a pressurized water reactor (Surry Unit 1). Both the Sandia and Brookhaven projects have examined only accidents initiated by internal plant faults---so-called ``internal initiators.`` This project, which has explored the likelihood of seismic-initiated core damage accidents during refueling outage conditions, is complementary to the internal-initiator analyses at Brookhaven and Sandia. This report covers the seismic analysis at Grand Gulf. All of the many systems modeling assumptions, component non-seismic failure rates, and human effort rates that were used in the internal-initiator study at Grand Gulf have been adopted here, so that the results of the study can be as comparable as possible. Both the Sandia study and this study examine only one shutdown plant operating state (POS) at Grand Gulf, namely POS 5 representing cold shutdown during a refueling outage. This analysis has been limited to work analogous to a level-1 seismic PRA, in which estimates have been developed for the core-damage frequency from seismic events during POS 5. The results of the analysis are that the core-damage frequency for earthquake-initiated accidents during refueling outages in POS 5 is found to be quite low in absolute terms, less than 10{sup {minus}7}/year.

Budnitz, R.J. [Future Resources Associates, Inc., Berkeley, CA (United States); Davis, P.R. [PRD Consulting (United States); Ravindra, M.K.; Tong, W.H. [EQE International, Inc., Irvine, CA (United States)

1994-08-01T23:59:59.000Z

248

Data management implementation plan for the site characterization of the Waste Area Grouping 1 Groundwater Operable Unit at Oak Ridge National Laboratory  

Science Conference Proceedings (OSTI)

The Waste Area Grouping (WAG) 1 Groundwater Operable Unit (OU) at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee, is undergoing a site characterization. This project is not mandated by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); therefore, no formalized meetings for data quality objective (DQO) development were held. Internally, DQOs were generated by the project team based on the end uses of the data to be collected. The 150-acre WAG 1 is contained within the ORNL security area. It includes all of the former ORNL radioisotope research, production, and maintenance facilities; former waste management areas; and some former administrative facilities. The goal of the WAG 1 Groundwater Site Characterization is to provide the necessary data on the nature and extent of groundwater contamination with an acceptable level of uncertainty to support the selection of remedial alternatives and to identify additional data needs for future actions. Primary objectives for the site characterization are: (1) To identify and characterize contaminant migration pathways based on the collection of groundwater data; (2) to identify sources of groundwater contamination and evaluate remedial actions which could be implemented to control or eliminate these sources; and (3) To conduct groundwater monitoring in support of other OUs in WAG 1 and the ORNL Groundwater OU.

Ball, T.S.; Nickle, E.B.

1994-10-01T23:59:59.000Z

249

Spatial Analysis of Contaminants in 200 West Area Groundwater in Support of the 200-ZP-1 Operable Unit Pre-Conceptual Remedy Design  

Science Conference Proceedings (OSTI)

This report documents a preliminary spatial and geostatistical analysis of the distribution of several contaminants of interest (COIs) in groundwater within the unconfined aquifer beneath the 200 West Area of the Hanford Site. The contaminant plumes of interest extend within the 200-ZP-1 and 200-UP-1 groundwater operable units. The COIs included in the PNNL study were carbon tetrachloride (CTET), technetium-99 (Tc-99), iodine-129 (I-129), chloroform, plutonium, uranium, trichloroethylene (TCE), and nitrate. The project included three tasks. Task 1 involved the development of a database that includes all relevant depth-discrete data on the distribution of COIs in the study area. The second task involved a spatial analysis of the three-dimensional (3D) distribution of data for the COIs in the study area. The main focus of the task was to determine if sufficient data are available for geostatistical mapping of the COIs in 3D. Task 3 involved the generation of numerical grids of the concentration of CTET, chloroform, and Tc-99.

Murray, Christopher J.; Bott, Yi-Ju

2008-12-30T23:59:59.000Z

250

Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). Supplement No. 15  

Science Conference Proceedings (OSTI)

This report supplements the Safety Evaluation Report (SER), NUREG-0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985), Supplement No. 4 (March 1985), Supplement No. 5 (November 1990), Supplement No. 6 (April 1991), Supplement No. 7 (September 1991), Supplement No. 8 (January 1992), Supplement No. 9 (June 1992), Supplement No. 10 (October 1992), Supplement No. 11 (April 1993), Supplement No. 12 (October 1993), Supplement No. 13 (April 1994), and Supplement No. 14 (December 1994) issued by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). The facility is located in Rhea County, Tennessee, near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the outstanding and confirmatory items, and proposed license conditions identified in the SER.

Tam, P.S.

1995-06-01T23:59:59.000Z

251

Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory  

SciTech Connect

This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

1993-07-01T23:59:59.000Z

252

Waste Management Plan for the Remedial Investigation of Waste Area Grouping 10, Operable Unit 3, at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

This Waste Management Plan (WMP) supplements the Remedial Investigation/Feasibility Study (RI/FS) Project WMP and defines the criteria and methods to be used for managing and characterizing waste generated during activities associated with the RI of 23 wells near the Old Hydrofracture Facility (OHF). These wells are within the Waste Area Grouping (WAG) 5 area of contamination (AOC) at Oak Ridge National Laboratory (ORNL). Field activities for the limited RI of Operable Unit (OU) 3 of WAG 10 will involve sampling and measurement of various environmental media (e.g., liquids and gases). Many of these activities will occur in areas known to be contaminated with radioactive materials or hazardous chemical substances, and it is anticipated that contaminated solid and liquid wastes and noncontaminated wastes will be generated as a result of these activities. On a project-wide basis, handling of these waste materials will be accomplished in accordance with the RI/FS Project WMP and the procedures referenced throughout the plan.

Not Available

1993-10-01T23:59:59.000Z

253

Remedial Investigation Work Plan for Chestnut Ridge Operable Unit 1 (Chestnut Ridge Security Pits) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This document outlines the activities necessary to conduct a Remedial Investigation (RI) of the Chestnut Ridge Security Pits (CRSP) at the Oak Ridge Y-12 Plant. The CRSP, also designated Chestnut Ridge Operable Unit (OU) 1, is one of four OUs along Chestnut Ridge on the Oak Ridge Reservation (ORR). The purpose of the RI is to collect data to (1) evaluate the nature and extent of known and suspected contaminants, (2) support an Ecological Risk Assessment (ERA) and a Human Health Risk Assessment (HHRA), (3) support the feasibility study in the development and analysis of remedial alternatives, and (4) ultimately, develop a Record of Decision (ROD) for the site. This chapter summarizes the regulatory background of environmental investigation on the ORR and the approach currently being followed and provides an overview of the RI to be conducted at the CRSP. Subsequent chapters provide details on site history, sampling activities, procedures and methods, quality assurance (QA), health and safety, and waste management related to the RI.

Not Available

1994-03-01T23:59:59.000Z

254

DOE Awards Over a Billion Supercomputing Hours to Address Scientific...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Over a Billion Supercomputing Hours to Address Scientific Challenges DOE Awards Over a Billion Supercomputing Hours to Address Scientific Challenges January 26, 2010 - 12:00am...

255

DOE's Office of Science Awards 95 Million Hours of Supercomputing...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95 Million Hours of Supercomputing Time to Advance Research in Science, Academia and Industry DOE's Office of Science Awards 95 Million Hours of Supercomputing Time to Advance...

256

Microsoft Word - UPDATE 2 - Unit 1.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 to: 2 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant Modeling Unit 1 Emissions at Maximum and Minimum Loads ENSR Corporation December 20, 2005 Document Number 10350-002-410 (Update 2) December, 2005 1-1 1.0 INTRODUCTION This report describes AERMOD modeling results performed for Unit 1 at Mirant's Potomac River Generating Station. The purpose of these runs was to demonstrate that operation of Unit 1 for 24 hours a day at loads from 35 MW to 88 MW with the use of trona to reduce SO 2 emissions will not cause or contribute to modeled exceedances of the National Ambient Air Quality Standards (NAAQS). Mirant proposes to use trona on an as needed basis to limit SO 2 emissions to less than 0.89 lb/MMBtu

257

hourly emission factors | OpenEI  

Open Energy Info (EERE)

60 60 Varnish cache server Browse Upload data GDR 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142278660 Varnish cache server hourly emission factors Dataset Summary Description Emissions from energy use in buildings are usually estimated on an annual basis using annual average multipliers. Using annual numbers provides a reasonable estimation of emissions, but it provides no indication of the temporal nature of the emissions. Therefore, there is no way of understanding the impact on emissions from load shifting and peak shaving technologies such as thermal energy storage, on-site renewable energy, and demand control. Source NREL Date Released April 11th, 2011 (3 years ago) Date Updated April 11th, 2011 (3 years ago)

258

Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 2. Appendixes A, B, C, D  

SciTech Connect

This document contains appendices A (water characterization), B (sediment characterization), C (biota Characterization), D (applicable or relevant and appropriate requirements) from the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include {sup 137}Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and {sup 137}Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River.

NONE

1995-09-01T23:59:59.000Z

259

Nuclear Operations Application to Environmental Restoration at Corrective Action Unit 547, Miscellaneous Contaminated Waste Sites, at the Nevada National Security Site  

SciTech Connect

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office has responsibility for environmental restoration at the Nevada National Security Site (formerly the Nevada Test Site). This includes remediation at locations where past testing activities have resulted in the release of plutonium to the environment. One of the current remediation efforts involves a site where an underground subcritical nuclear safety test was conducted in 1964. The underground test was vented through a steel pipe to the surface in a closed system where gas samples were obtained. The piping downstream of the gas-sampling apparatus was routed belowground to a location where it was allowed to vent into an existing radioactively contaminated borehole. The length of the pipe above the ground surface is approximately 200 meters. This pipe remained in place until remediation efforts began in 2007, at which time internal plutonium contamination was discovered. Following this discovery, an assessment was conducted to determine the quantity of plutonium present in the pipe. This site has been identified as Corrective Action Unit (CAU) 547, Miscellaneous Contaminated Waste Sites. The quantity of plutonium identified at CAU 547 exceeded the Hazard Category 3 threshold but was below the Hazard Category 2 threshold specified in DOE Standard DOE-STD-1027-92. This CAU, therefore, was initially categorized as a Hazard Category 3 environmental restoration site. A contaminated facility or site that is initially categorized as Hazard Category 3, however, may be downgraded to below Hazard Category 3 if it can be demonstrated through further analysis that the form of the material and the energy available for release support reducing the hazard category. This is an important consideration when performing hazard categorization of environmental restoration sites because energy sources available for release of material are generally fewer at an environmental restoration site than at an operating facility and environmental restoration activities may result in the complete removal of source material.

Kevin Cabble (NSO), Mark Krauss and Patrick Matthews (N-I)

2011-03-03T23:59:59.000Z

260

Field Evaluation of the 200 kW PAFC Unit at the Pittsburgh International Airport  

Science Conference Proceedings (OSTI)

Distributed generation, particularly in combination with the benefits of fuel cells, is attracting increasing utility industry interest. This report details more than 20,000 hours of automatic, unattended operation of an ONSI 200 kW phosphoric acid fuel cell at the Pittsburgh International Airport. Also included are installation, operation, and performance data on more than twenty other units in the U.S. ONSI fleet.

1997-09-30T23:59:59.000Z

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

IFP solutions for revamping catalytic reforming units  

Science Conference Proceedings (OSTI)

The decision-making process for the refiner considering a revamp of a catalytic reforming unit comprises many factors. These may be grouped in two broad areas: technical and economic. This paper presents the results of a study performed by IFP that illustrates catalytic reforming unit revamp options. Three IFP processes are described and operating conditions, expected yields, and economic data are presented. The following options are discussed: base case Conventional, fixed-bed, semi-regenerative catalytic reformer; Case 1--revamp using IFP Dualforming technology; Case 2--revamp using IFP Dualforming Plus technology; and Case 3--revamp to IFP Octanizing technology. The study illustrates various options for the refiner to balance unit performance improvements with equipment, site, and economic constraints. The study was performed assuming design feedrate of 98.2 tons/hour (20,000 BPSD) in all cases. Because of the increased need for octane in many refineries, the study assumed that operating severity was set at a design value of 100 research octane number clear (RON). In all of the cases in this study, it was assumed that the existing recycle compressor was reused. Operating pressure differences between the cases is discussed separately. Also, in all cases, a booster compressor was included in order to return export hydrogen pressure to that of the conventional unit.

Gendler, J.L. [HRI, Inc., Princeton, NJ (United States); Domergue, B.; Mank, L. [Inst. Francais du Petrole, Rueil Malmaison (France)

1996-12-01T23:59:59.000Z

262

Unit Conversion  

Science Conference Proceedings (OSTI)

Unit Conversion. ... Unit Conversion Example. "If you have an amount of unit of A, how much is that in unit B?"; Dimensional Analysis; ...

2012-12-04T23:59:59.000Z

263

D and D Operational Experience  

SciTech Connect

This paper describes the operational experience gained from more than 25 million man-hours of Decontamination and Decommissioning (D and D) work on both Department of Energy sites and commercial nuclear facilities in the United States. Nuclear D and D activities encompass some of the most hazardous activities imaginable - protecting workers from a huge range and endless combinations of industrial safety, radiological, nuclear safety, and industrial hygiene issues which challenges managers and safety professionals. Performing D and D activities safely is essential to project success. Managers must ensure that work is properly planned and executed, that hazards are identified and mitigated, and that operational experience is captured and utilized on future projects. Many of the lessons learned directly relate to the principles of behavioral-based safety. Our experience indicates that improved safety performance leads to improved productivity. (authors)

Meyer, K.A.; Smith, C.B. [BNG America, 9781 S. Meridian Blvd., Suite 100, Englewood, CO 80112 (United States)

2006-07-01T23:59:59.000Z

264

New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B  

SciTech Connect

This operations and maintenance plan supports the New Pump and Treat Facility (NPTF) remedial action work plan and identifies the approach and requirements for the operations and maintenance activities specific to the final medical zone treatment remedy. The NPTF provides the treatment system necessary to remediate the medical zone portion of the OU 1-07B contaminated groundwater plume. Design and construction of the New Pump and Treat Facility is addressed in the NPTF remedial action work plan. The scope of this operation and maintenance plan includes facility operations and maintenance, remedy five-year reviews, and the final operations and maintenance report for the NPTF.

L. O. Nelson

2003-09-01T23:59:59.000Z

265

united stadium. united station.  

E-Print Network (OSTI)

??DC United is one of Major League Soccerâs most decorated franchises, yet it still plays its home games within the crumbling confines of RFK Stadium.… (more)

Groff, David R.

2011-01-01T23:59:59.000Z

266

A franchising of retail operations : the case of the United States Postal Service building a retail network for the 21st century  

E-Print Network (OSTI)

This thesis is about the effects of changing customer preferences on the United States Postal Service's retail network and offers a process for wider adoption of its current retail partnership program. The Contract Postal ...

Sigmon, Kelly M. (Kelly Marie Berg)

2010-01-01T23:59:59.000Z

267

Slug Test Characterization Results for Multi-Test/Depth Intervals Conducted During the Drilling of CERCLA Operable Unit OU ZP-1 Wells 299-W10-33 and 299-W11-48  

SciTech Connect

Slug-test results obtained from single and multiple, stress-level slug tests conducted during drilling and borehole advancement provide detailed hydraulic conductivity information at two Hanford Site Operable Unit (OU) ZP-1 test well locations. The individual test/depth intervals were generally sited to provide hydraulic-property information within the upper ~10 m of the unconfined aquifer (i.e., Ringold Formation, Unit 5). These characterization results complement previous and ongoing drill-and-test characterization programs at surrounding 200-West and -East Area locations (see Figure S.1).

Newcomer, Darrell R.

2007-09-30T23:59:59.000Z

268

Results of the 1000 Hour Rotary Microfilter Endurance Test  

Stellite on Nitronic 60. 8 SRNL-L3100-2010-00229 Rotary Microfilter 1000 Hour Test Flux Data for 1000 Hour Test 0 1 2 3 4 5 6 0 100 200 300 400 500 ...

269

Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1. Volume 2, Part 1C: Analysis of core damage frequency from internal events for plant operational State 5 during a refueling outage, Main report (Sections 11--14)  

SciTech Connect

This document contains the accident sequence analysis of internally initiated events for Grand Gulf, Unit 1 as it operates in the Low Power and Shutdown Plant Operational State 5 during a refueling outage. The report documents the methodology used during the analysis, describes the results from the application of the methodology, and compares the results with the results from two full power analyses performed on Grand Gulf.

Whitehead, D. [Sandia National Labs., Albuquerque, NM (United States); Darby, J. [Science and Engineering Associates, Inc., Albuquerque, NM (United States); Yakle, J. [Science Applications International Corp., Albuquerque, NM (United States)] [and others

1994-06-01T23:59:59.000Z

270

WIPP Workers Reach Two Million Man-Hours Without a Lost-Time Accident  

NLE Websites -- All DOE Office Websites (Extended Search)

Workers Reach Two Million Man-Hours Workers Reach Two Million Man-Hours Without a Lost-Time Accident CARLSBAD, N.M., February 22, 2001 - Workers at the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) reached a safety milestone Feb. 19 by working two million man-hours without a lost-time accident. According to the National Safety Council, facilities with the same industry code as WIPP lose an average of 20.6 workdays (or 164.8 man-hours) a year to accidents. "Safety is at the core of all WIPP operations," said Dr. Inés Triay, Manager of DOE's Carlsbad Field Office. "We are particularly pleased that WIPP workers reached the two million mark during the time in which they mined a new panel and increased shift work." "To make safety a number one priority means more than creating a safe

271

Pantex celebrates three million hours without a lost time injury | National  

NLE Websites -- All DOE Office Websites (Extended Search)

three million hours without a lost time injury | National three million hours without a lost time injury | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex celebrates three million hours without a ... Pantex celebrates three million hours without a lost time injury Posted By Office of Public Affairs NNSA Blog NNSA Blog

272

Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Analysis of core damage frequency from internal events for Plant Operational State 5 during a refueling outage. Volume 2, Part 3: Internal Events Appendices I and J  

SciTech Connect

This report provides supporting documentation for various tasks associated with the performance of the probablistic risk assessment for Plant Operational State 5 during a refueling outage at Grand Gulf, Unit 1 as documented in Volume 2, Part 1 of NUREG/CR-6143.

Yakle, J. [Science Applications International Corp., Albuquerque, NM (United States); Darby, J. [Science and Engineering Associates, Inc., Albuquerque, NM (United States); Whitehead, D.; Staple, B. [Sandia National Labs., Albuquerque, NM (United States)

1994-06-01T23:59:59.000Z

273

Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit-1: Analysis of core damage frequency from internal events during mid-loop operations. Appendices F-H, Volume 2, Part 4  

Science Conference Proceedings (OSTI)

Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The scope of the level-1 study includes plant damage state analysis, and uncertainty analysis. Volume 1 summarizes the results of the study. Internal events analysis is documented in Volume 2. It also contains an appendix that documents the part of the phase 1 study that has to do with POSs other than mid-loop operation. Internal fire and internal flood analyses are documented in Volumes 3 and 4. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. Volume 6 documents the accident progression, source terms, and consequence analysis.

Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J. [Brookhaven National Lab., Upton, NY (United States); Bley, D.; Johnson, D. [PLG Inc., Newport Beach, CA (United States); Holmes, B. [AEA Technology, Dorset (United Kingdom)] [and others

1994-06-01T23:59:59.000Z

274

Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations. Appendix E (Sections E.9-E.16), Volume 2, Part 3B  

SciTech Connect

Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The scope of the level-1 study includes plant damage state analysis, and uncertainty analysis. Volume 1 summarizes the results of the study. Internal events analysis is documented in Volume 2. It also contains an appendix that documents the part of the phase 1 study that has to do with POSs other than mid-loop operation. Internal fire and internal flood analyses are documented in Volumes 3 and 4. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. Volume 6 documents the accident progression, source terms, and consequence analysis.

Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J.; Wong, S.M. [Brookhaven National Lab., Upton, NY (United States); Bley, D.; Johnson, D. [PLG Inc., Newport Beach, CA (United States)] [and others

1994-06-01T23:59:59.000Z

275

Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit-1: Analysis of core damage frequency from internal events during mid-loop operations. Appendix I, Volume 2, Part 5  

SciTech Connect

Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Lab. (BNL) and Sandia National Labs. (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this volume of the report is to document the approach utilized in the level-1 internal events PRA for the Surry plant, and discuss the results obtained. A phased approach was used in the level-1 program. In phase 1, which was completed in Fall 1991, a coarse screening analysis examining accidents initiated by internal events (including internal fire and flood) was performed for all plant operational states (POSs). The objective of the phase 1 study was to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenarios, and to provide a foundation for a detailed phase 2 analysis.

Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J. [Brookhaven National Lab., Upton, NY (United States); Bley, D.; Johnson, D. [PLG Inc., Newport Beach, CA (United States); Holmes, B. [AEA Technology, Dorset (United Kingdom)] [and others

1994-06-01T23:59:59.000Z

276

Top 100 Operators: Proved Reserves and Production, Operated vs ...  

U.S. Energy Information Administration (EIA)

The operator of an oil or gas field is the company ... Operators in the United States are obligated to ... Reserves Production Reserves Production ...

277

Emissions Tradeoffs Between Boiler Operations and a Selective Catalytic Reduction System: Field Test Results on an 850-MW Opposed-Wall Design Unit  

Science Conference Proceedings (OSTI)

Burning low-cost, high-sulfur coals under staged combustion conditions can lead to increased waterwall wastage. Utilities are thus in need of a method for determining the least-cost approach for minimizing nitrogen oxide (NOx) through both boiler and selective catalytic reduction (SCR) operations, while taking into account potential cost impacts of various operating scenarios. This report is one in an EPRI series to quantify the costs and benefits associated with different boiler and SCR ...

2013-06-25T23:59:59.000Z

278

Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Appendices A--D. Volume 2, Part 2  

Science Conference Proceedings (OSTI)

During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the Potential risks during low Power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the Plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. We recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown. Procedures written specifically for shutdown accidents would be useful. This document, Volume 2, Pt. 2 provides appendices A through D of this report.

Chu, T.L.; Musicki, Z.; Kohut, P. [Brookhaven National Lab., Upton, NY (United States)] [and others

1994-06-01T23:59:59.000Z

279

Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Appendices E (Sections E.1--E.8). Volume 2, Part 3A  

SciTech Connect

During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. The authors recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown. Procedures written specifically for shutdown accidents would be useful.

Chu, T.L.; Musicki, Z.; Kohut, P. [Brookhaven National Lab., Upton, NY (United States)] [and others

1994-06-01T23:59:59.000Z

280

Diurnal Variability of Precipitation in the Northeastern United States  

Science Conference Proceedings (OSTI)

The diurnal and semidiurnal variations of precipitation over the northeastern United States (New England, New York, New Jersey and Pennsylvania) are investigated using 25 years of hourly precipitation data for 271 stations. The hourly data were ...

Michael G. Landin; Lance F. Bosart

1985-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Evaluation of severe accident risk during mid-loop operations. Main report. Volume 6. Part 1  

SciTech Connect

During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. A phased approach was used in the level-1 program. In phase 1 which was completed in Fall 1991, a coarse screening analysis including internal fire and flood was performed for all plant operational states (POSs). The objective of the phase 1 study was to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenarios, and to provide a foundation for a detailed phase 2 analysis. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The results of the phase 2 level 2/3 study are the subject of this volume of NUREG/CR-6144, Volume 6.

Jo, J.; Lin, C.C.; Neymotin, L. [Brookhaven National Lab., Upton, NY (United States)] [and others

1995-05-01T23:59:59.000Z

282

Solving Unit Commitment by a Unit Decommitment Method  

E-Print Network (OSTI)

demand, and operating constraints such as spinning reserve requirements, over a short time horizon of power unit i is generating in time period t pmin i pmax i : minimum maximum rated capacity of unit i rmax i : maximum reserve for unit i ripit : reserve available from unit i in time period t minrmax i

283

Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Evaluation of severe accident risk during mid-loop operations. Volume 6, Part 2: Appendices  

SciTech Connect

The objectives are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed. Volume 1 summarizes the results of the study. The scope of the level-1 study includes plant damage state analyses, and uncertainty analysis. The internal event analysis is documented in Volume 2. The internal fire and internal flood analysis are documented in Volumes 3 and 4, respectively. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associated, Inc. A phased approach was used in the level 2/3 PRA program, however both phases addressed the risk from only mid-loop operation. The first phase of the level 2/3 PRA was initiated in late 1991 and consisted of an Abridged Risk Study. This study was completed in May 1992 and was focused on accident progression and consequences, conditional on core damage. Phase 2 is a more detailed study in which an evaluation of risk during mid-loop operation was performed. The results of the phase 2 level 2/3 study are the subject of this volume of NUREG/CR-6144, Volume 6. This report, Volume 6, Part 2, consists of five appendices containing supporting information for: the PDS (plant damage state) analysis; the accident progression analysis; the source term analysis; the consequence analysis; and the Melcor analysis. 73 figs., 21 tabs.

Jo, J.; Lin, C.C.; Neymotin, L.; Mubayi, V. [Brookhaven National Lab., Upton, NY (United States)

1995-05-01T23:59:59.000Z

284

Hospital Triage in First Hours After Nuclear or Radiological...  

NLE Websites -- All DOE Office Websites (Extended Search)

Hospital Triage in the First 24 Hours after a Nuclear or Radiological Disaster Medical professionals with the Radiation Emergency Assistance CenterTraining Site (REACTS) at the...

285

Delayed Start or Cancellation of Business Hours | Argonne National...  

NLE Websites -- All DOE Office Websites (Extended Search)

Twitter Delayed Start or Cancellation of Business Hours Winter Road Closings Winter Weather FAQs Westgate Alternate Routes Reporting IllegalUnethical Activity Working Remotely...

286

Does EIA publish data on peak or hourly electricity ...  

U.S. Energy Information Administration (EIA)

Financial market analysis and financial ... load (or demand) data in our Electric Power Annual ... hourly load/demand profiles for some Independent ...

287

Regional operations research program for development of geothermal energy in the southwest United States. Final technical report, June 1977-August 1978  

DOE Green Energy (OSTI)

The efforts by the Core and State Teams in data acquisition, electric and non-electric economic studies, development of computer support functions and operations, and preparation of geothermal development scenarios are described. Team reports for the states of Arizona, Colorado, Nevada, New Mexico, and Utah are included in the appendices along with a summary of the state scenarios. (MHR)

Marlin, J.M.; Christ, R.; McDevitt, P.; Nowotny, K.; O'Dea, P.; Rao, C.R.; Swanberg, C.

1979-01-01T23:59:59.000Z

288

Regional operation research program for development of geothermal energy in the southwest United States. Final technical report, June 1977--August 1978  

DOE Green Energy (OSTI)

This report describes the work accomplished from June 1977 to August 1978. The efforts by the Core and State Teams in data acquisition, electric and non-electric economic studies, development of computer support functions and operations, and preparation of geothermal development scenarios are described.

Marlin, J.M; Christ, R.; McDevitt, P.; Nowotny, K.; O'Dea, P.; Rao, C.R.; Swanberg, C.

1979-01-01T23:59:59.000Z

289

Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Summary of results. Volume 1  

SciTech Connect

During 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to examine the potential risks during low power and shutdown operations. Two plants, Surry and Grand Gulf, were selected as the plants to be studied by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). This report documents the work performed during the analysis of the Grand Gulf plant. A phased approach was used for the overall study. In Phase 1, the objectives were to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenario frequencies and risks, and to provide a foundation for a detailed Phase 2 analysis. It was in Phase 1 that the concept of plant operational states (POSs) was developed to allow the analysts to better represent the plant as it transitions from power operation to nonpower operation than was possible with the traditional technical specification divisions of modes of operation. This phase consisted of a coarse screening analysis performed for all POSs, including seismic and internal fire and flood for some POSs. In Phase 2, POS 5 (approximately cold shutdown as defined by Grand Gulf Technical Specifications) during a refueling outage was selected as the plant configuration to be analyzed based on the results of the Phase 1 study. The scope of the Level 1 study includes plant damage state analysis and uncertainty analysis and is documented in a multi-volume NUREG/CR report (i.e., NUREG/CR-6143). The internal events analysis is documented in Volume 2. Internal fire and internal flood analyses are documented in Volumes 3 and 4, respectively. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. The Level 2/3 study of the traditional internal events is documented in Volume 6, and a summary of the results for all analyses is documented in Volume 1.

Whitehead, D.W. [ed.; Staple, B.D.; Daniel, S.L. [and others

1995-07-01T23:59:59.000Z

290

Utah Southwest Regional Geothermal Development Operations Research Project. Appendix 10 of regional operations research program for development of geothermal energy in the Southeast United States. Final technical report, June 1977--August 1978  

DOE Green Energy (OSTI)

The Southwest Regional Geothermal Operations/Research project was initiated to investigate geothermal development in the five states within the region: Arizona, Colorado, Nevada, New Mexico, and Utah. Although the region changed during the first year to include Idaho, Montana, North Dakota, South Dakota, and Wyoming, the project objectives and procedures remained unchanged. The project was funded by the DOE/DGE and the Four Corners Regional Commission with participation by the New Mexico Energy Resources Board. The study was coordinated by the New Mexico Energy Institute at New Mexico State University, acting through a 'Core Team'. A 'state' team, assigned by the states, conducted the project within each state. This report details most of the findings of the first year's efforts by the Utah Operations/Research team. It is a conscientious effort to report the findings and activities of the Utah team, either explicitly or by reference. The results are neither comprehensive nor final, and should be regarded as preliminary efforts to much of what the Operations/Research project was envisioned to accomplish. In some cases the report is probably too detailed, in other cases too vague; hopefully, however, the material in the report, combined with the Appendices, will be able to serve as source material for others interested in geothermal development in Utah.

Green, Stanley; Wagstaff, Lyle W.

1979-01-01T23:59:59.000Z

291

Utah Southwest Regional Geothermal Development Operations Research Project. Appendix 10 of regional operations research program for development of geothermal energy in the Southeast United States. Final technical report, June 1977--August 1978  

SciTech Connect

The Southwest Regional Geothermal Operations/Research project was initiated to investigate geothermal development in the five states within the region: Arizona, Colorado, Nevada, New Mexico, and Utah. Although the region changed during the first year to include Idaho, Montana, North Dakota, South Dakota, and Wyoming, the project objectives and procedures remained unchanged. The project was funded by the DOE/DGE and the Four Corners Regional Commission with participation by the New Mexico Energy Resources Board. The study was coordinated by the New Mexico Energy Institute at New Mexico State University, acting through a 'Core Team'. A 'state' team, assigned by the states, conducted the project within each state. This report details most of the findings of the first year's efforts by the Utah Operations/Research team. It is a conscientious effort to report the findings and activities of the Utah team, either explicitly or by reference. The results are neither comprehensive nor final, and should be regarded as preliminary efforts to much of what the Operations/Research project was envisioned to accomplish. In some cases the report is probably too detailed, in other cases too vague; hopefully, however, the material in the report, combined with the Appendices, will be able to serve as source material for others interested in geothermal development in Utah.

Green, Stanley; Wagstaff, Lyle W.

1979-01-01T23:59:59.000Z

292

Physical Property Analysis and Report for Sediments at 100-BC-5 Operable Unit, Boreholes C7505, C7506, C7507, and C7665  

Science Conference Proceedings (OSTI)

Between October 14, 2009 and February 22, 2010 sediment samples were received from 100-BC Decision Unit for geochemical studies. This is an analytical data report for sediments received from CHPRC at the 100 BC 5 OU. The analyses for this project were performed at the 325 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

Lindberg, Michael J.

2010-09-28T23:59:59.000Z

293

Quasi-real-time analysis of dynamic near field scattering data using a graphics processing unit  

E-Print Network (OSTI)

We present an implementation of the analysis of dynamic near field scattering (NFS) data using a graphics processing unit (GPU). We introduce an optimized data management scheme thereby limiting the number of operations required. Overall, we reduce the processing time from hours to minutes, for typical experimental conditions. Previously the limiting step in such experiments, the processing time is now comparable to the data acquisition time. Our approach is applicable to various dynamic NFS methods, including shadowgraph, Schlieren and differential dynamic microscopy.

Giovanni Cerchiari; Fabrizio Croccolo; Frédéric Cardinaux; Frank Scheffold

2012-09-15T23:59:59.000Z

294

NREL GIS Data: Continental United States Photovoltaic Low Resolution...  

Open Energy Info (EERE)

the uncertainty of the modeled estimates increase with distance from reliable measurement sources and with the complexity of the terrain. Units are in kilowatt hours...

295

NREL GIS Data: Continental United States Photovoltaic Low Resolution  

Open Energy Info (EERE)

the uncertainty of the modeled estimates increase with distance from reliable measurement sources and with the complexity of the terrain. Units are in kilowatt hours...

296

Pd/k for RTF and 232-H TCAP units  

DOE Green Energy (OSTI)

The Thermal Cycling Absorption Process (TCAP) will be used in the Replacement Tritium Facility (RTF) and 232-H Tritium Facility for separation of hydrogen isotopes. These TCAP units will be filled with palladium deposited on kieselguhr (Pd/k) that has been heat treated to reduce particle breakdown and sieved to remove particles smaller than 50 mesh (300{mu}m). Pd/k ordered for several applications in the RTF, including TCAP, was received at SRL in April 1989. Shortly thereafter, flow restriction caused by breakdown of the Pd/k particles was detected during operation of a TCAP unit in the Advanced Hydride Laboratory (AHL). Subsequent research at SRL showed that heating Pd/k at 1100{degrees}C in air for 2 hours greatly reduces mechanical breakdown. Based on these favorable results, sufficient Pd/k was heat treated to fill RTF and Building 232-H TCAP units. 11 refs., 11 figs., 7 tabs.

Mosley, W.C.

1991-01-29T23:59:59.000Z

297

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bangor Hydro-Electric Company Bangor Hydro-Electric Company OE Docket No. PP-89-1 Amendment to Presidential Permit Order No. PP-89-1 December 30,2005 PRESIDENTIAL PERMIT AMENDMENT Bangor Hydro-Electric Company Order No. PP-89-1 I. BACKGROUND The Department of Energy (DOE) has responsibility for implementing Executive Order (E.O.) 10485, as amended by E.O. 12038, which requires the issuance of a Presidential permit by DOE before electric trans~nission facilities may be constructed, operated, maintained, or connected at the borders of the United States. DOE may issue such a permit if it determines that the permit is in the public interest and after obtaining favorable recommendations from the U.S. Departments of State and Defense. On December 16, 1988, Bangor Hydro-Electric Company (BHE) applied to DOE

298

The Future of Biofuels: An Economic Analysis of the Design and Operation of a Microalgae Facility in Texas and the Southwestern United States  

E-Print Network (OSTI)

The world of energy is changing. With rising energy costs and concerns over the supply of energy materials, more research is being conducted into alternative sources of fuel and microalgae is one of the sources being researched, although much research had been conducted on it as a part of the Aquatic Species Program from the 1970s to the early 1990s. With the emergence of microalgae as a source of alternative energy, the need for an economic analysis of microalgae has arisen. This research studies the economic feasibility of the design and operation of a microalgae production facility in two Texas locations (Pecos and Corpus Christi) and in southeastern New Mexico using a stochastic simulation model. It examines the production levels needed for the facility to be profitable and also some facility designs necessary for that profitability. It also measures several annual financial indicators so that potential investors have some estimates of the future profitability of the microalgae industry. The results show that for microalgae to become a viable commercial operation, production must be improved beyond the current levels and the levels suggested by the literature. Production needs to be at least 0.8 g/L/day with 40 percent oil content and 24 inches of water depth. Production must be improved through increasing growth rates and oil contents at greater water depths. Production can be improved through nutrient and carbon dioxide usage, two elements that are being heavily researched. Water usage will become a major focus because of the limited resources and the quantities necessary to operate a commercial-scale facility. With the necessary improvements in technology and research, microalgae could prove to be a viable source of alternative energy.

Allison, Marc S.

2010-08-01T23:59:59.000Z

299

Environmental Assessment for the Operation of the Glass Melter Thermal Treatment Unit at the US Department of Energy`s Mound Plant, Miamisburg, Ohio  

SciTech Connect

The glass melter would thermally treat mixed waste (hazardous waste contaminated with radioactive constituents largely tritium, Pu-238, and/or Th-230) that was generated at the Mound Plant and is now in storage, by stabilizing the waste in glass blocks. Depending on the radiation level of the waste, the glass melter may operate for 1 to 6 years. Two onsite alternatives and seven offsite alternatives were considered. This environmental assessment indicates that the proposed action does not constitute a major Federal action significantly affecting the human environment according to NEPA, and therefore the finding of no significant impact is made, obviating the need for an environmental impact statement.

NONE

1995-06-01T23:59:59.000Z

300

New Mexico Southwest Regional Geothermal Development Operations Research Project. Appendix 9 of regional operations research program for development of geothermal energy in the Southwest United States. Final technical report, June 1977--August 1978  

DOE Green Energy (OSTI)

This final report describes the findings and conclusions of the New Mexico Team during the first project year of the Southwest Regional Geothermal Development Operations Research Project. The purpose of this project is to help realize a goal of the USDOE , Division of Geothermal Energy (DOE/DGE), to accelerate the actual commercial utilization of geothermal energy. This was done by: (1) identifying the potential for development of geothermal energy in the five-state regions of Arizona, Colorado, New Mexico, Nevada and Utah; and (2) identifying the actions needed to accomplish that development.

Ortiz, Thomas A.; Fedor, Dennis

1979-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Hour-by-Hour Cost Modeling of Optimized Central Wind-Based Water Electrolysis Production - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Genevieve Saur (Primary Contact), Chris Ainscough. National Renewable Energy Laboratory (NREL) 15013 Denver West Parkway Golden, CO 80401-3305 Phone: (303) 275-3783 Email: genevieve.saur@nrel.gov DOE Manager HQ: Erika Sutherland Phone: (202) 586-3152 Email: Erika.Sutherland@ee.doe.gov Project Start Date: October 1, 2010 Project End Date: Project continuation and direction determined annually by DOE Fiscal Year (FY) 2012 Objectives Corroborate recent wind electrolysis cost studies using a * more detailed hour-by-hour analysis. Examine consequences of different system configuration * and operation for four scenarios, at 42 sites in five

302

Legend Units  

Science Conference Proceedings (OSTI)

... Syntax: LEGEND UNIT units> where is an integer number or parameter in the range 1 to 100 that specifies the legend identifier; and ...

2013-11-27T23:59:59.000Z

303

Development of an Hourly Optimization Tool for Renewable Energy Systems  

SciTech Connect

An hourly optimization tool is developed to select and size renewable energy (RE) systems to meet the energy needs for various federal facilities. The optimization is based on life cost analysis of various RE technologies including wind and PV systems. The developed hourly optimization tool is used to evaluate the cost-effectiveness of RE technologies using complex energy and demand charges such time-of-use (TOU) rates. The paper compares results obtained using hourly analysis instead of annual based calculations to optimize the sizing of RE systems for residential, commercial, and industrial facilities in three representative US climates.

Lee, C.; Walker, A.; Krarti, M.

2010-01-01T23:59:59.000Z

304

Superfund record of decision (EPA Region 1): Fort Devens Sudbury Training Annex, source control operable unit, Middlesex County, MA, September 29, 1995  

Science Conference Proceedings (OSTI)

This Record of Decision (ROD) document presents the selected source control (SC) remedial action at areas of contamination (AOCs) A7 and A9 at the Fort Devens Sudbury Training Annex (Annex), Middlesex County, Massachusetts. The major components of the selected remedy for AOCs A7 and A9 include: Excavation and off-site treatment and disposal of laboratory waste at AOC A7; Excavation of contaminated soil from AOC A9 and consolidation at AOC A7; Consolidation of contaminated soil and solid waste at AOC A7 to within the limits of the landfill cap; Construction of a Resource Conservation and Recovery Act (RCRA) Subtitle C landfill cap at AOC A7; Environmental monitoring and operation and maintenance (O&M) at AOC A7; Institutional controls at AOC A7 to limit future site use and to restrict site access; and Five-year reviews at AOC A7.

NONE

1996-03-01T23:59:59.000Z

305

A Quality Assurance System for Canadian Hourly Pressure Data  

Science Conference Proceedings (OSTI)

In this study a comprehensive quality assurance (QA) system, which includes the hydrostatic check combined with a statistical homogeneity test, is designed and applied to hourly pressure records (for 1953–2002) from 761 Canadian stations, to ...

Hui Wan; Xiaolan L. Wang; Val R. Swail

2007-11-01T23:59:59.000Z

306

Complex Quality Assurance of Historical Hourly Surface Airways Meteorological Data  

Science Conference Proceedings (OSTI)

A new complex quality assurance (QA) procedure is developed for historical hourly surface airways meteorological data, recently digitized in a U.S. government–sponsored effort that extends the digital period of record back as early as the late ...

Daniel Y. Graybeal; Arthur T. DeGaetano; Keith L. Eggleston

2004-08-01T23:59:59.000Z

307

DOE Awards Over a Billion Supercomputing Hours to Address Scientific  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Over a Billion Supercomputing Hours to Address Over a Billion Supercomputing Hours to Address Scientific Challenges DOE Awards Over a Billion Supercomputing Hours to Address Scientific Challenges January 26, 2010 - 12:00am Addthis Washington, DC. - The U.S. Department of Energy announced today that approximately 1.6 billion supercomputing processor hours have been awarded to 69 cutting-edge research projects through the Innovative and Novel Computational Impact on Theory and Experiment (INCITE) program. The INCITE program provides powerful resources to enable scientists and engineers to conduct cutting-edge research in just weeks or months rather than the years or decades needed previously. This facilitates scientific breakthroughs in areas such as climate change, alternative energy, life sciences, and materials science.

308

DOE Awards Over a Billion Supercomputing Hours to Address Scientific  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Awards Over a Billion Supercomputing Hours to Address DOE Awards Over a Billion Supercomputing Hours to Address Scientific Challenges DOE Awards Over a Billion Supercomputing Hours to Address Scientific Challenges January 26, 2010 - 12:00am Addthis Washington, DC. - The U.S. Department of Energy announced today that approximately 1.6 billion supercomputing processor hours have been awarded to 69 cutting-edge research projects through the Innovative and Novel Computational Impact on Theory and Experiment (INCITE) program. The INCITE program provides powerful resources to enable scientists and engineers to conduct cutting-edge research in just weeks or months rather than the years or decades needed previously. This facilitates scientific breakthroughs in areas such as climate change, alternative energy, life

309

Global Solar Radiation Estimation from Relative Sunshine Hours in Italy  

Science Conference Proceedings (OSTI)

We examine the existing measurements of global solar radiation and sunshine duration for Italy, and evaluate the errors made in estimating global solar radiation from sunshine hours measurements. We find that the Ångstrom–Black linear relation in ...

A. Andretta; B. Bartoli; B. Coluzzi; V. Cuomo; M. Francesca; C. Serio

1982-10-01T23:59:59.000Z

310

Airport quotas and peak hour pricing : theory and practice  

E-Print Network (OSTI)

This report examines the leading theoretical studies not only of airport peak-hour pricing but also of the congestion costs associated with airport delays and presents a consistent formulation of both. The report also ...

Odoni, Amedeo R.

1976-01-01T23:59:59.000Z

311

Six- and three-hourly meteorological observations from 223 USSR stations  

SciTech Connect

This document describes a database containing 6- and 3-hourly meteorological observations from a 223-station network of the former Soviet Union. These data have been made available through cooperation between the two principal climate data centers of the United States and Russia: the National Climatic Data Center (NCDC), in Asheville, North Carolina, and the All-Russian Research Institute of Hydrometeorological Information -- World Data Centre (RIHMI-WDC) in Obninsk. Station records consist of 6- and 3-hourly observations of some 24 meteorological variables including temperature, weather type, precipitation amount, cloud amount and type, sea level pressure, relative humidity, and wind direction and speed. The 6-hourly observations extend from 1936 to 1965; the 3-hourly observations extend from 1966 through the mid-1980s (1983, 1984, 1985, or 1986; depending on the station). These data have undergone extensive quality assurance checks by RIHMI-WDC, NCDC, and the Carbon Dioxide Information Analysis Center (CDIAC). The database represents a wealth of meteorological information for a large and climatologically important portion of the earth`s land area, and should prove extremely useful for a wide variety of regional climate change studies. These data are available free of charge as a numeric data package (NDP) from CDIAC. The NDP consists of this document and 40 data files that are available via the Internet or on 8mm tape. The total size of the database is {approximately}2.6 gigabytes.

Razuvaev, V.N.; Apasova, E.B.; Martuganov, R.A. [All-Russian Research Inst. of Hydrometeorologicl Information, Obninsk (Russia). World Data Centre; Kaiser, D.P. [Oak Ridge National Lab., TN (United States)

1995-04-01T23:59:59.000Z

312

All electric homes in the United States  

SciTech Connect

This report presents information on the average annual costs for representative amounts of electricity to consumers in homes utilizing electricity exclusively for all purposes. Average annual electric bills, average charges per kilowatt-hour and average kilowatt-hour consumption for these homes are shown on a nationwide basis and for each State and individual communities throughout the United States.

1975-01-01T23:59:59.000Z

313

Verti Jack Pumping Unit evaluation  

Science Conference Proceedings (OSTI)

The Verti Jack Pumping Unit was tested primarily to establish the energy comsumption efficiency of the unit as compared with that of conventional pumping unit. Before the unit was field tested, extensive static testing was performed to determine the effect of the counterbalance system throughout the operational cycle. The field test included comparing the performance of the Verti Jack Unit and conventional pump jacks - a Bethlehem 16 and Cabot 25 pumping unit. The Verti Jack unit was operated at four different pumping conditions. The Verti Jack unit peformed satisfactorily during the testing. Only minor problems that could not be attributed to the design or operation of the unit were encountered. Changing the stroke length was difficult in the field, but such operational problems were expected in operating the first phototype and can be corrected on future models. During the higher pumping rate tests of the Verti Jack unit, the well ceased to deliver fluid quantities at rates adequate to the pumping rate. These data are shown in table 8. Therefore, evaluation data are based on theoretical pump performance and are presented in table 9. The data show that the Verti Jack is more efficient than the conventional units tested. The most direct comparison was the Verti Jack test at 36-inch stroke and 12 1/2 strokes per minute versus the Cabot unit at 37-inch stroke and 12 strokes per minute. In the comparison the Verti Jack operated about 24 percent more efficiently than the Cabot unit. Comparing the summation of all Verti Jack tests with that of all conventional unit tests, the Verti Jack operated about 15 percent more efficiently. Compared to the Cabot unit only, the Verti Jack was about 17 percent more energy efficient. 13 figs., 12 tabs.

Porter, R.; Spence, K.

1985-11-01T23:59:59.000Z

314

Building Technologies Program: Tax Deduction Qualified Software - Hourly Analysis Program (HAP) version 4.40  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hourly Analysis Program (HAP) version 4.40.0.61 Hourly Analysis Program (HAP) version 4.40.0.61 On this page you'll find information about the HAP version 4.40.0.61 qualified computer software (buildings.energy.gov/qualified_software.html), which calculates energy and power cost savings that meet federal tax incentive requirements for commercial buildings. Date Documentation Received by DOE: 10 April 2009 Statements in quotes are from the software developer. Internal Revenue Code §179D (c)(1) and (d) Regulations Notice 2006-52, Section 6 requirements as amplified by Notice 2008-40, Section 4 requirements. (1) The name, address, and (if applicable) web site of the software developer; Carrier / United Technologies Corporation Carrier Software Systems Bldg TR-4, Room 400A P. O. Box 4808 Syracuse, New York 13221

315

Building Technologies Program: Tax Deduction Qualified Software - Hourly Analysis Program (HAP) version 4.41  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hourly Analysis Program (HAP) version 4.41.0.6 Hourly Analysis Program (HAP) version 4.41.0.6 On this page you'll find information about the HAP version 4.41.0.6 qualified computer software (buildings.energy.gov/qualified_software.html), which calculates energy and power cost savings that meet federal tax incentive requirements for commercial buildings. Date Documentation Received by DOE: 10 April 2009 Statements in quotes are from the software developer. Internal Revenue Code §179D (c)(1) and (d) Regulations Notice 2006-52, Section 6 requirements as amplified by Notice 2008-40, Section 4 requirements. (1) The name, address, and (if applicable) web site of the software developer; Carrier / United Technologies Corporation Carrier Software Systems Bldg TR-4, Room 400A P. O. Box 4808 Syracuse, New York 13221

316

UR Self-Service Hours of Operation Available 24/7, except for daily updates  

E-Print Network (OSTI)

5) Choose the Term 6) Search for courses by subject, and narrow down your search by course number for Classes 4) Select a Term To Add a Course 1) Scroll down to Add Class Worksheet 2) Enter your CRN 2) Class Schedules 3) Class Sections Requiring Staff Registration 4) Select a term 5) Search

Argerami, Martin

317

Bathroom lights generally operate between five to eight hours per occupied  

E-Print Network (OSTI)

Symposium on the Global Energy Future October 1 ­ 5, 2010 Financial Policy & Travel Reimbursement reimbursement procedures for University Partner visitors attending the Symposium on the Global Energy Future to $5000 for travel related expenses to St. Louis in addition to providing one (1) hotel room at the Ritz

318

Addendum to the Closure Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Discharge Area, Nevada Test Site, Revision 0  

SciTech Connect

This document constitutes an addendum to the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Discharge Area Nevada Test Site, December 1997 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-19-01, A12 Fleet Ops Steam Cleaning Efflu. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.

Grant Evenson

2009-05-01T23:59:59.000Z

319

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The energy made available for a contract year shall be scheduled monthly such that the maximum amount scheduled in any month shall not exceed 240 hours per kilowatt of the...

320

INCITE Program Doles Out Hours on Supercomputers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INCITE Program Doles Out Hours on Supercomputers INCITE Program Doles Out Hours on Supercomputers INCITE Program Doles Out Hours on Supercomputers November 5, 2012 - 1:30pm Addthis Mira, the 10-petaflop IBM Blue Gene/Q system at Argonne National Laboratory, is capable of carrying out 10 quadrillion calculations per second. Each year researchers apply to the INCITE program to get to use this machine's incredible computing power. | Photo courtesy of Argonne National Lab. Mira, the 10-petaflop IBM Blue Gene/Q system at Argonne National Laboratory, is capable of carrying out 10 quadrillion calculations per second. Each year researchers apply to the INCITE program to get to use this machine's incredible computing power. | Photo courtesy of Argonne National Lab. Charles Rousseaux Charles Rousseaux Senior Writer, Office of Science

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Report for Batch Leach Analyses on Sediments at 100-HR-3 Operable Unit, Boreholes C7620, C7621, C7622, C7623, C7626, C7627, C7628, C7629, C7630, and C7866.  

Science Conference Proceedings (OSTI)

This is a data report for sediment samples analyzed for CHPRC. Between November 4, 2010 and April 25, 2011 sediment samples were received from 100-HR-3 Operable Unit for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

Lindberg, Michael J.

2011-06-01T23:59:59.000Z

322

Systematic Method for Evaluating Extraction and Injection Flow Rates for 100-KR-4 and 100-HR-3 Groundwater Operable Unit Pump-and-Treat Interim Actions for Hydraulic Containment  

Science Conference Proceedings (OSTI)

This document describes a systematic method to develop flow rate recommendations for Pump-and-Treat (P&T) extraction and injection wells in 100-KR-4 and 100-HR-3 Groundwater Operable Units (OU) of the Hanford Site. Flow rate recommendations are developed as part of ongoing performance monitoring and remedy optimization of the P&T interim actions to develop hydraulic contairnnent of the dissolved chromium plume in groundwater and protect the Columbia River from further discharges of groundwater from inland. This document details the methodology and data required to infer the influence of individual wells near the shoreline on hydraulic containment and river protection and develop flow rate recommendations to improve system performance and mitigate potential shortcomings of the system configuration in place.

Spiliotopoulos, Alexandros A.

2013-03-20T23:59:59.000Z

323

Slug Test Characterization Results for Multi-Test/Depth Intervals Conducted During the Drilling of CERCLA Operable Unit OU ZP-1 Wells 299-W11-43, 299-W15-50, and 299-W18-16  

SciTech Connect

The following report presents test descriptions and analysis results for multiple, stress level slug tests that were performed at selected test/depth intervals within three Operable Unit (OU) ZP-1 wells: 299-W11-43 (C4694/Well H), 299-W15-50 (C4302/Well E), and 299-W18-16 (C4303/Well D). These wells are located within south-central region of the Hanford Site 200-West Area (Figure 1.1). The test intervals were characterized as the individual boreholes were advanced to their final drill depths. The primary objective of the hydrologic tests was to provide information pertaining to the areal variability and vertical distribution of hydraulic conductivity with depth at these locations within the OU ZP-1 area. This type of characterization information is important for predicting/simulating contaminant migration (i.e., numerical flow/transport modeling) and designing proper monitor well strategies for OU and Waste Management Area locations.

Spane, Frank A.; Newcomer, Darrell R.

2010-06-21T23:59:59.000Z

324

Remedial investigation work plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Study (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.

Not Available

1993-05-01T23:59:59.000Z

325

English Units  

Science Conference Proceedings (OSTI)

English Units. A, B, C, D, E, F, G, H, I, J. 1, Steam Point Calculator: English Units, ... 6, Height of steam point apparatus above ground (ft.), 0, ft. ...

2011-12-22T23:59:59.000Z

326

Unit Conversions  

Science Conference Proceedings (OSTI)

... volume flow units, which contain "atm", assume that the gas is: ideal; at a pressure of 101325 Pa; at a temperature of 0 °C. Be aware that the unit "atm ...

2012-10-02T23:59:59.000Z

327

Renewable Energies program (6 credit hour) Option A: 11  

E-Print Network (OSTI)

Renewable Energies program (6 credit hour) Option A: 11 Option B: The program is organized by t Spanish Institute and the Asso program on renewable energy will provide students with advanced knowledge. opportunities: option A- two renewable energies; option B include on-site visits to renewable energy generation

Simaan, Nabil

328

A Quality-Control Routine for Hourly Wind Observations  

Science Conference Proceedings (OSTI)

The quality of hourly wind speed and direction observations from 41 northeastern U.S. first-order weather stations is evaluated with regard to the recognition of individual observations that are either obviously in error or of suspect quality. An ...

Arthur T. DeGaetano

1997-04-01T23:59:59.000Z

329

NV Energy Large-Scale Photovoltaic Integration Study: Intra-Hour Dispatch and AGC Simulation  

SciTech Connect

The uncertainty and variability with photovoltaic (PV) generation make it very challenging to balance power system generation and load, especially under high penetration cases. Higher reserve requirements and more cycling of conventional generators are generally anticipated for large-scale PV integration. However, whether the existing generation fleet is flexible enough to handle the variations and how well the system can maintain its control performance are difficult to predict. The goal of this project is to develop a software program that can perform intra-hour dispatch and automatic generation control (AGC) simulation, by which the balancing operations of a system can be simulated to answer the questions posed above. The simulator, named Electric System Intra-Hour Operation Simulator (ESIOS), uses the NV Energy southern system as a study case, and models the system’s generator configurations, AGC functions, and operator actions to balance system generation and load. Actual dispatch of AGC generators and control performance under various PV penetration levels can be predicted by running ESIOS. With data about the load, generation, and generator characteristics, ESIOS can perform similar simulations and assess variable generation integration impacts for other systems as well. This report describes the design of the simulator and presents the study results showing the PV impacts on NV Energy real-time operations.

Lu, Shuai; Etingov, Pavel V.; Meng, Da; Guo, Xinxin; Jin, Chunlian; Samaan, Nader A.

2013-01-02T23:59:59.000Z

330

Operating Experience of a Coal Fired Fluidized Bed at Georgetown University  

E-Print Network (OSTI)

Operation of the 100,000 lb/hr capacity, coal fired fluidized bed steam generator at Georgetown University began in July 1979. This project, which was co-funded by Georgetown University and the U. S. Department of Energy, involved expansion of the heating and cooling plant with this new coal fired facility. Previously existing units at the University heating and cooling plant normally fire natural gas. The fluidized bed steam generating facility at Georgetown University is the only new coal fired facility to be built in the Washington D. C. area in many years. The purpose of this program is to demonstrate industrial and institutional application of fluidized bed combustion using high sulfur coal in an environmentally acceptable manner in a populated area. The unit has been successfully operated for over 1400 hours and in compliance with the strict emission regulations of Washington, D.C. Operation on automatic control has been achieved and only minor operating difficulties have been experienced.

Lutes, I. G.; Gamble, R. L.

1980-01-01T23:59:59.000Z

331

July 2010, Status and Outlook for Nuclear Energy In the United States |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 2010, Status and Outlook for Nuclear Energy In the United July 2010, Status and Outlook for Nuclear Energy In the United States July 2010, Status and Outlook for Nuclear Energy In the United States The U.S. nuclear power industry continues to make pro- gress toward the construction of new nuclear power plants in the United States. Currently, 13 license applica- tions are under active review by the Nuclear Regulatory Commission (NRC) for up to 22 new reactors. The De- partment of Energy has awarded conditional commit- ments for loan guarantees to the partners in the Vogtle project and is negotiating terms for loan guarantees with several new nuclear projects. The 104 operating plants continue to perform well, turn- ing in sustained performance for output and capacity factor - an estimated 798.7 billion kilowatt-hours and 90.5 percent respectively in 2009.

332

Production Program - Operational - SNAP 10A Units  

SciTech Connect

This planning report is provided to describe the lead time, approximate costs, and major decisions and approvals required to enter a production program for the 500 watt SNAP 10A nuclear space power system.

1961-08-07T23:59:59.000Z

333

Improved Modular CSSX Unit (MCU) Operations  

• Change Distributed Control System software to reflect new flowsheet • Develop on-line solvent analysis technology – DSSHT – SEHT. Improved MCU ...

334

UNIT OPERATION Separator, 3 phase separator, tank.  

E-Print Network (OSTI)

gas volume . . valve, control system . column, reactor . 2. ROATING EQUIPMENT. . Centrifugal compressor, expander, reciprocating compressor centrifugal pump . -Centrifugal compressor expander Inlet output connection , power source volume head . motor

Hong, Deog Ki

335

Nuclear Energy In the United States Executive Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 10 Status and Outlook for Nuclear Energy In the United States Executive Summary The U.S. nuclear power industry continues to make pro- gress toward the construction of new nuclear power plants in the United States. Currently, 13 license applica- tions are under active review by the Nuclear Regulatory Commission (NRC) for up to 22 new reactors. The De- partment of Energy has awarded conditional commit- ments for loan guarantees to the partners in the Vogtle project and is negotiating terms for loan guarantees with several new nuclear projects. The 104 operating plants continue to perform well, turn- ing in sustained performance for output and capacity factor - an estimated 798.7 billion kilowatt-hours and 90.5 percent respectively in 2009.

336

UNITED STATES OF AMERICA BEFORE THE DEPARTMENT OF ENERGY Energy Information Administration Proposal to Create )  

Gasoline and Diesel Fuel Update (EIA)

UNITED STATES OF AMERICA UNITED STATES OF AMERICA BEFORE THE DEPARTMENT OF ENERGY ) Energy Information Administration Proposal to Create ) Form EIA-930, ''Balancing Authority Operations Report'' ) ) COMMENTS OF THE ISO/RTO COUNCIL Pursuant to the Federal Register Notice ("Notice") 1 issued by the Department of Energy, the ISO/RTO Council ("IRC") 2 submits the following comments on the proposed new EIA reporting obligation that would be required pursuant to proposed Form EIA-930 - ''Balancing Authority Operations Report.'' The EIA proposal was published on March 6, 2013, and public comments were requested by May 6, 2013. Form EIA-930 is a new survey that would require Balancing Authorities, such as the IRC members, to provide hourly electric power operating data, including:

337

High Temperature Solid-Oxide Electrolyzer 2500 Hour Test Results At The Idaho National Laboratory  

DOE Green Energy (OSTI)

The Idaho National Laboratory (INL) has been developing the concept of using solid oxide fuel cells as electrolyzers for large-scale, high-temperature (efficient), hydrogen production. This program is sponsored by the U.S. Department of Energy under the Nuclear Hydrogen Initiative. Utilizing a fuel cell as an electrolyzer introduces some inherent differences in cell operating conditions. In particular, the performance of fuel cells operated as electrolyzers degrades with time faster. This issue of electrolyzer cell and stack performance degradation over time has been identified as a major barrier to technology development. Consequently, the INL has been working together with Ceramatec, Inc. (Salt Lake City, Utah) to improve the long-term performance of high temperature electrolyzers. As part of this research partnership, the INL conducted a 2500 hour test of a Ceramatec designed and produced stack operated in the electrolysis mode. This paper will provide a summary of experimental results to date for this ongoing test.

Carl Stoots; James O'Brien; Stephen Herring; Keith Condie; Lisa Moore-McAteer; Joseph J. Hartvigsen; Dennis Larsen

2009-11-01T23:59:59.000Z

338

2500-Hour High Temperature Solid-Oxide Electrolyzer Long Duration Test  

DOE Green Energy (OSTI)

The Idaho National Laboratory (INL) has been developing the concept of using solid oxide fuel cells as electrolyzers for large-scale, high-temperature (efficient), hydrogen production. This program is sponsored by the U.S. Department of Energy under the Nuclear Hydrogen Initiative. Utilizing a fuel cell as an electrolyzer introduces some inherent differences in cell operating conditions. In particular, the performance of fuel cells operated as electrolyzers degrades with time faster. This issue of electrolyzer cell and stack performance degradation over time has been identified as a major barrier to technology development. Consequently, the INL has been working together with Ceramatec, Inc. (Salt Lake City, Utah) to improve the long-term performance of high temperature electrolyzers. As part of this research partnership, the INL conducted a 2500 hour test of a Ceramatec designed and produced stack operated in the electrolysis mode. This report will provide a summary of experimental results for this long duration test.

C. M. Stoots; J. E. O'Brien; K. G. Condie; L. Moore-McAteer; J. J. Hartvigsen; D. Larsen

2009-11-01T23:59:59.000Z

339

Cyclic Operation of Power Plant: Technical, Operational and Cost Issues -- An International Seminar: Proceedings: ''Two Shifting'' Seminar  

SciTech Connect

Because of changes in demand and competition within the power industry, fossil fuel plants in many countries are now subject to two-shift operation, that is, generating power for 10-15 hours during the day only, usually in combination with a complete shutdown on weekends. Other fossil-fueled units, although running around the clock, need to follow changes in electricity demand. This mode of functioning, in which temperatures and pressures are never stable for more than a few hours, is referred to as ''cyclic operation of plant.'' The aim of the seminar at which these papers were presented was to identify the basic causes of component and equipment problems in two-shift operation, and to begin to identify procedures that could minimize operating and maintenance costs. The papers cover the following topics: Session 1: Plant Operation Experience and Design Issues; Session 2: Materials Issues; Session 3: Cost, Manpower and Management Issues; Session 4: Plant Automation Issues; Session 5: Hot Section Gas Turbine Issues; and Session 6: HRSG [heat recovery steam generator] Issues.

None

2001-01-01T23:59:59.000Z

340

Third Northeast Regional Operational Workshop  

Science Conference Proceedings (OSTI)

The Third Northeast Regional Operational Workshop, focusing on hydrometeorology in the northeastern United States, was held 6-7 November 2001 in Albany, New York. Sessions covered cold season events, warm season events, modeling,and operational ...

Eugene P. Auciello

2002-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

AFBC - operation of small scale demonstration for greenhouse heating  

SciTech Connect

A 2.2 million Btu/hr unit prototype AFBC system was installed in 1995 at Cedar Lane Farms, a commercial nursery in Ohio. The AFBC is in operation and is heating hot water for greenhouse temperature control. A team consisting of the Energy and Environmental Research Corporation, the Ohio Agricultural Research and Development Center of Ohio State University and the Will-Burt Company developed this technology with funding support from the Ohio Coal Development Office and the U.S. Department of Energy. The system is fully automated with little operator attention being required. Operating experience at Cedar Lane Farms has shown that only 2 hours per day of operation attention is required for the system. The system includes flyash/sorbent reinjection and underbed coal/limestone feed. These features provide for good limestone utilization; a Ca/S (in coal) ratio of 2.5 will maintain an SO{sub 2} emissions level of 1.2 lb/10{sup 6} Btu when burning high sulfur (3.2%) Ohio coal. A baghouse is used to control particulate emissions. Based on the success of the prototype unit, a design has been recently completed for a commercial size 10 x 10{sup 6} Btu/hr capacity range. Multiple AFBC units can be used to provide larger heat outputs. Potential coal-fired AFBC users include institutions (schools, hospitals, prisons, government), light industry (agricultural, food processing), commercial users (shopping centers), and large residential users (apartment complexes). 6 figs., 1 tab.

Ashworth, R.A.; Plessinger, D.A.; Webner, R.L.; Machamer, T.

1996-12-31T23:59:59.000Z

342

Addendum to the remedial investigation report on Bear Creek Valley Operable Unit 2 (Rust Spoil Area, Spoil Area 1, and SY-200 Yard) at the Oak Ridge Y-12 Plant Oak Ridge, Tennessee. Volume 1: Main text  

Science Conference Proceedings (OSTI)

This addendum to the Remedial Investigation (RI) Report on Bear Creek Valley Operable Unit (OU) 2 at the Oak Ridge Y-12 Plant was prepared in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) for reporting the results of a site characterization for public review. This addendum is a supplement to a document that was previously issued in January 1995 and that provided the Environmental Restoration Program with information about the results of the 1993 investigation performed at OU 2. The January 1995 D2 version of the RI Report on Bear Creek Valley OU 2 included information on risk assessments that have evaluated impacts to human health and the environment. Information provided in the document formed the basis for the development of the Feasibility Study Report. This addendum includes revisions to four chapters of information that were a part of the document issued in January 1995. Specifically, it includes revisions to Chaps. 2, 3, 4, and 9. Volume 1 of this document is not being reissued in its entirety as a D3 version because only the four chapters just mentioned have been affected by requested changes. Note also that Volume 2 of this RI Report on Bear Creek Valley OU 2 is not being reissued in conjunction with Volume 1 of this document because there have been no changes requested or made to the previously issued version of Volume 2 of this document.

NONE

1995-04-01T23:59:59.000Z

343

Amp-hour counting control for PV hybrid power systems  

SciTech Connect

The performance of an amp-hour (Ah) counting battery charge control algorithm has been defined and tested using the Digital Solar Technologies MPR-9400 microprocessor based PV hybrid charge controller. This work included extensive field testing of the charge algorithm on flooded lead-antimony and valve regulated lead-acid (VRLA) batteries. The test results after one-year have demonstrated that PV charge utilization, battery charge control, and battery state of charge (SOC) has been significantly improved by providing maximum charge to the batteries while limiting battery overcharge to manufacturers specifications during variable solar resource and load periods.

Hund, T.D. [Sandia National Labs., Albuquerque, NM (United States); Thompson, B. [Biri Systems, Ithaca, NY (United States)

1997-06-01T23:59:59.000Z

344

FOR PUBLICATION UNITED STATES COURT OF APPEALS FOR THE NINTH...  

NLE Websites -- All DOE Office Websites (Extended Search)

of the United States Constitution, and the sovereign immunity of the United States. Fluor Hanford ("Fluor"), a private contractor operating at Hanford, intervened as a plaintiff....

345

Metric Units  

Science Conference Proceedings (OSTI)

... A, B, C, D, E, F, G, H, I, J. 1, Steam Point Calculator: Metric Units, Elevation Converter, ... 6, Height of steam point apparatus above ground (m), 0, m, ...

2011-12-22T23:59:59.000Z

346

United States  

Office of Legacy Management (LM)

- I - I United States Department of Energy D lSCk Al M E R "This book was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency

347

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Cuba from NREL Cuba from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a location, if enough years of data are present. The TMY consists of months selected from individual years and concatenated to form a complete year.. Because of the selection criteria, these TMYs are not appropriate for simulations of wind energy conversion systems. A TMY provides a standard for hourly data for solar radiation and other meteorological elements that permit performance comparisons of system types and configurations for one or more locations. A TMY is not necessarily a good indicator of conditions over the next year, or even the next 5 years. Rather, it represents conditions judged to be typical over a long period of time, such as 30 years.

348

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Nepal from NREL Nepal from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a location, if enough years of data are present. The TMY consists of months selected from individual years and concatenated to form a complete year.. Because of the selection criteria, these TMYs are not appropriate for simulations of wind energy conversion systems. A TMY provides a standard for hourly data for solar radiation and other meteorological elements that permit performance comparisons of system types and configurations for one or more locations. A TMY is not necessarily a good indicator of conditions over the next year, or even the next 5 years. Rather, it represents conditions judged to be typical over a long period of time, such as 30 years.

349

Folding Proteins at 500 ns/hour with Work Queue  

E-Print Network (OSTI)

Abstract—Molecular modeling is a field that traditionally has large computational costs. Until recently, most simulation techniques relied on long trajectories, which inherently have poor scalability. A new class of methods is proposed that requires only a large number of short calculations, and for which minimal communication between computer nodes is required. We considered one of the more accurate variants called Accelerated Weighted Ensemble Dynamics (AWE) and for which distributed computing can be made efficient. We implemented AWE using the Work Queue framework for task management and applied it to an all atom protein model (Fip35 WW domain). We can run with excellent scalability by simultaneously utilizing heterogeneous resources from multiple computing platforms such as clouds (Amazon EC2, Microsoft Azure), dedicated clusters, grids, on multiple architectures (CPU/GPU, 32/64bit), and in a dynamic environment in which processes are regularly added or removed from the pool. This has allowed us to achieve an aggregate sampling rate of over 500 ns/hour. As a comparison, a single process typically achieves 0.1 ns/hour. I.

Badi Abdul-wahid; Li Yu; Dinesh Rajan

2012-01-01T23:59:59.000Z

350

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Kenya from NREL Kenya from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a location, if enough years of data are present. The TMY consists of months selected from individual years and concatenated to form a complete year.. Because of the selection criteria, these TMYs are not appropriate for simulations of wind energy conversion systems. A TMY provides a standard for hourly data for solar radiation and other meteorological elements that permit performance comparisons of system types and configurations for one or more locations. A TMY is not necessarily a good indicator of conditions over the next year, or even the next 5 years. Rather, it represents conditions judged to be typical over a long period of time, such as 30 years.

351

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

China from NREL China from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a location, if enough years of data are present. The TMY consists of months selected from individual years and concatenated to form a complete year. Because of the selection criteria, these TMYs are not appropriate for simulations of wind energy conversion systems. A TMY provides a standard for hourly data for solar radiation and other meteorological elements that permit performance comparisons of system types and configurations for one or more locations. A TMY is not necessarily a good indicator of conditions over the next year, or even the next 5 years. Rather, it represents conditions judged to be typical over a long period of time, such as 30 years.

352

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Bangladesh stations from NREL Bangladesh stations from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a location, if enough years of data are present. The TMY consists of months selected from individual years and concatenated to form a complete year.. Because of the selection criteria, these TMYs are not appropriate for simulations of wind energy conversion systems. A TMY provides a standard for hourly data for solar radiation and other meteorological elements that permit performance comparisons of system types and configurations for one or more locations. A TMY is not necessarily a good indicator of conditions over the next year, or even the next 5 years. Rather, it represents conditions judged to be typical over a long period of time, such as 30 years.

353

Unit Energy Europe AG | Open Energy Information  

Open Energy Info (EERE)

search Name Unit Energy Europe AG Place Bad Homburg v.d.H., Hessen, Germany Sector Hydro, Wind energy Product Unit Energy develops and operates wind parks and hydroelectric...

354

JGI - Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations The Operations Department sees to it that JGI has the best possible facilities and support, ensuring that its operations are conducted in accordance with the...

355

Power Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Operations Outage Coordination Standards of Conduct Transmission Planning You are here: SN Home page > Power Operations Power Operations Western's Sierra Nevada Region...

356

How much electricity is used for cooling in the United States ...  

U.S. Energy Information Administration (EIA)

How much electricity is used for cooling in the United States? In 2011, EIA estimates that about 440 billion kilowatt-hours ... tariff, and demand charge data?

357

Figure 9.1 Nuclear Generating Units - U.S. Energy Information ...  

U.S. Energy Information Administration (EIA)

Figure 9.1 Nuclear Generating Units Operable Units,1 1957-2011 Nuclear Net Summer Capacity Change, 1950-2011 Status of All Nuclear Generating Units, ...

358

Building Technologies Program: Tax Deduction Qualified Software - Hourly Analysis Program (HAP) version 4.31  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 On this page you'll find information about the Hourly Analysis Program (HAP) version 4.31 qualified computer software (www.buildings.energy.gov/qualified_software.html), which calculates energy and power cost savings that meet federal tax incentive requirements for commercial buildings (www.buildings.energy.gov/commercial/). Date Documentation Received by DOE: 17 August 2006 Statements in quotes are from the software developer. Internal Revenue Code §179D (c)(1) and (d) Regulations Notice 2006-52, Section 6 requirements (1) The name, address, and (if applicable) web site of the software developer; Carrier / United Technologies Corporation Carrier Software Systems Bldg TR-4, Room 400A P. O. Box 4808 Syracuse, New York 13221 (2) The name, email address, and

359

Building Technologies Program: Tax Deduction Qualified Software - Hourly Analysis Program (HAP) version 4.34  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 On this page you'll find information about the Hourly Analysis Program (HAP) version 4.34 qualified computer software (www.buildings.energy.gov/qualified_software.html), which calculates energy and power cost savings that meet federal tax incentive requirements for commercial buildings (www.buildings.energy.gov/commercial/). Date Documentation Received by DOE: 10 August 2007 Statements in quotes are from the software developer. Internal Revenue Code §179D (c)(1) and (d) Regulations Notice 2006-52, Section 6 requirements (1) The name, address, and (if applicable) web site of the software developer; Carrier / United Technologies Corporation Carrier Software Systems Bldg TR-4, Room 400A P. O. Box 4808 Syracuse, New York 13221 (2) The name, email address, and

360

Remedial Investigation Report on Chestnut Ridge Operable Unit 2 (Filled Coal Ash Pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1. Main Text  

Science Conference Proceedings (OSTI)

This document is a report on the remedial investigation (RI) of Chestnut Ridge Operable Unit (OU) 2 at the Oak Ridge Y-12 Plant. Chestnut Ridge OU 2 consists of Upper McCoy Branch (UMB), the Filled Coal Ash Pond (FCAP), and the area surrounding the Sluice Channel formerly associated with coal ash disposal in the FCAP. Chestnut Ridge OU 2 is located within the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation in Anderson County, Tennessee, approximately 24 miles west of Knoxville. The pond is an 8.5-acre area on the southern slope of Chestnut Ridge, 0.5 mile south of the main Y-12 Plant and geographically separated from the Y-12 Plant by Chestnut Ridge. The elevation of the FCAP is {approximately} 950 ft above mean sea level (msl), and it is relatively flat and largely vegetated. Two small ponds are usually present at the northeast and northwest comers of the FCAP. The Sluice Channel Area extends {approximately}1000 ft from the northern margin of the FCAP to the crest of Chestnut Ridge, which has an elevation of {approximately}1100 ft above msl. The Sluice Channel Area is largely vegetated also. McCoy Branch runs from the top of Chestnut Ridge across the FCAP into Rogers Quarry and out of the quarry where it runs a short distance into Milton Hill Lake at McCoy Embayment, termed UMB. The portion south of Rogers Quarry, within Chestnut Ridge OU 4, is termed Lower McCoy Branch. The DOE Oak Ridge Y-12 Plant disposed of coal ash from its steam plant operations as a slurry that was discharged into an ash retention impoundment; this impoundment is the FCAP. The FCAP was built in 1955 to serve as a settling basin after coal ash slurried over Chestnut Ridge from the Y-12 Plant. The FCAP was constructed by building an earthen dam across the northern tributary of McCoy Branch. The dam was designed to hold 20 years of Y-12 steam plant ash. By July 1967, ash had filled up the impoundment storage behind the dam to within 4 ft of the top.

Not Available

1994-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Ghana from NREL Ghana from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a

362

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Sri Lanka from NREL Sri Lanka from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a

363

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Honduras from SUNY Honduras from SUNY Dataset Summary Description (Abstract): Zip file contains year-site specific files including time series of global, direct and diffuse irradiance (Purpose): The time series are useful for performing site specific simulation of customized solar energy systems (Supplemental Information): Each file's name identifies year and location, by listing Country_City_latitude-longitude_year, e.g., EL_SALVADOR_San_Salvador_13.75-89.15_98.out is for the city of San Salvador, in El Salvador, latitude 13.75 degrees, longitude -89.15 degrees, year 1998. The content of each file includes A one line header, listing latitude, longitude and ground elevation in meters,Hourly records including, year, month, day, time (GMT), global irradiance, direct irradiance and

364

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Brazil from NREL Brazil from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a

365

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Nicaragua from SUNY Nicaragua from SUNY Dataset Summary Description (Abstract): Zip file contains year-site specific files including time series of global, direct and diffuse irradiance (Purpose): The time series are useful for performing site specific simulation of customized solar energy systems (Supplemental Information): Each file's name identifies year and location, by listing Country_City_latitude-longitude_year, e.g., EL_SALVADOR_San_Salvador_13.75-89.15_98.out is for the city of San Salvador, in El Salvador, latitude 13.75 degrees, longitude -89.15 degrees, year 1998. The content of each file includes A one line header, listing latitude, longitude and ground elevation in meters,Hourly records including, year, month, day, time (GMT), global irradiance, direct irradiance and

366

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Central America from NREL Central America from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a

367

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Guatemala from SUNY Guatemala from SUNY Dataset Summary Description (Abstract): Zip file contains year-site specific files including time series of global, direct and diffuse irradiance (Purpose): The time series are useful for performing site specific simulation of customized solar energy systems (Supplemental Information): Each file's name identifies year and location, by listing Country_City_latitude-longitude_year, e.g., EL_SALVADOR_San_Salvador_13.75-89.15_98.out is for the city of San Salvador, in El Salvador, latitude 13.75 degrees, longitude -89.15 degrees, year 1998. The content of each file includes A one line header, listing latitude, longitude and ground elevation in meters,Hourly records including, year, month, day, time (GMT), global irradiance, direct irradiance and

368

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Cuba sites from SUNY Cuba sites from SUNY Dataset Summary Description (Abstract): Zip file contains year-site specific files including time series of global, direct and diffuse irradiance (Purpose): The time series are useful for performing site specific simulation of customized solar energy systems (Supplemental Information): Each file's name identifies year and location, by listing Country_City_latitude-longitude_year, e.g., EL_SALVADOR_San_Salvador_13.75-89.15_98.out is for the city of San Salvador, in El Salvador, latitude 13.75 degrees, longitude -89.15 degrees, year 1998. The content of each file includes A one line header, listing latitude, longitude and ground elevation in meters,Hourly records including, year, month, day, time (GMT), global irradiance, direct irradiance and

369

What do hourly performance data on a building tell us  

DOE Green Energy (OSTI)

Hourly performance data on a building contain valuable information on the dynamics of the building and of the HVAC systems. Quantities such as the building loss coefficient, solar gains, and the net effect of thermal masses and their couplings are all contained in the data. The building element vector analysis (BEVA) method has been applied to a multizone residential passive solar building monitored under the SERI Class B program. Using short-term data (approximately one week), the building parameters were regressed. With these as inputs, the subsequent performance of the building was well predicted. Using performance data for the period February 3-9, 1982, the building vectors were obtained by regression. The resulting best fit for the zone temperature is given. These parameters were used to predict the temperature for the period February 10-14. The resulting values are also plotted along with the outdoor temperature, solar radiation on a south vertical surface, and auxiliary energy for these periods.

Subbarao, K.

1984-11-01T23:59:59.000Z

370

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

El Salvador sites from SUNY El Salvador sites from SUNY Dataset Summary Description (Abstract): Zip file contains year-site specific files including time series of global, direct and diffuse irradiance (Purpose): The time series are useful for performing site specific simulation of customized solar energy systems (Supplemental Information): Each file's name identifies year and location, by listing Country_City_latitude-longitude_year, e.g., EL_SALVADOR_San_Salvador_13.75-89.15_98.out is for the city of San Salvador, in El Salvador, latitude 13.75 degrees, longitude -89.15 degrees, year 1998. The content of each file includes A one line header, listing latitude, longitude and ground elevation in meters,Hourly records including, year, month, day, time (GMT), global irradiance, direct irradiance and

371

Solar: hourly solar (direct normal (DNI), global horizontal (GHI), and  

Open Energy Info (EERE)

Ethiopia from NREL Ethiopia from NREL Dataset Summary Description (Abstract): Each data file is a set of hourly values of solar radiation and meteorological elements for a 1-year period. Solar radiation is modeled using the NREL METSTAT model, with surface observed cloud cover being the principal model input. Each container file contains up to 30 yearly files for one station, plus the Typical Meteorological Year (TMY) file for the selected station, plus documentation files and a TMY data reader file for use with Microsoft Excel. (Purpose): Simulations (Supplemental Information): The intended use of these data files is for computer simulations of solar energy conversion systems and building systems. The yearly data may be suitable for designing systems and their components to meet the worst-case conditions occurring at a

372

This Week at OPERS Mon. June 11 -Sun. June 17  

E-Print Network (OSTI)

, Summer Hours Begin at OPERS Sat. July 28 - Sun. July 29, Santa Cruz Breakers, Lower Field, 7am-6pm MON

California at Santa Cruz, University of

373

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BP Energy Company BP Energy Company OE Docket No. EA- 3 14 Order Authorizing Electricity Exports to Mexico Order No. EA-3 14 February 22,2007 BP Energy Company Order No. EA-314 I. BACKGROUND Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(Q of the Department of Energy Organization Act (42 U.S.C. 7 15 l(b), 7172(f)) and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C.S24a(e)) . On May 22,2006, BP Energy Company (BP Energy) applied to DOE for an authorization to transmit electric energy from the United States to Mexico as a power marketer. BP Energy proposes to purchase surplus electric energy from electric utilities and other suppliers within the United States and to export that energy to ~Mexico. The cnergy

374

United States  

Office of Legacy Management (LM)

Office of Research and EPA 600/R-941209 Environmental Protection Development January 1993 Agency Washington, DC 20460 Offsite Environmental 57,,7 Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1992 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY OFFICE OF RESEARCH AND DEVELOPMENT ENVIRONMENTAL MONITORING SYSTEMS LABORATORY-LAS VEGAS P.O. BOX 93478 LAS VEGAS. NEVADA 891 93-3478 702/798-2100 Dear Reader: Since 1954, the U.S. Environmental Protection Agency (EPA) and its predecessor the U.S, Public Health Service (PHs) has conducted radiological monitoring in the offsite areas around United States nuclear test areas. The primary objective of this monitoring has been the protection of the health and safety of

375

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

')/06 MON 14:28 FAX 423 241 3897 OIG ')/06 MON 14:28 FAX 423 241 3897 OIG --- HQ 1o001 ,O " F 1325.8 (08-93) United States Government Department of Energy memorandum DATE: April 10, 2006 Audit Report No.: OAS-L-06-11 REPLY TO ATTN OF: IG-32 (A05ID043) SUBJECT: Audit of "Contract Transition Activities at the Idaho Operations Office" TO: Manager, Idaho Operations Office INTRODUCTION AND OBJECTIVE The Department of Energy's Idaho Operations Office has ongoing missions focused primarily in the areas of nuclear energy and environmental cleanup. From October 1, 1999 to February 1, 2005, Bechtel BWXT Idaho, LLC (Bechtel) managed facility operations for both of these missions. In Fiscal Year 2005, two separate contracts began in order to add focus and clarity to each respective mission. First, the Idaho National

376

United States Attorney General  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

93, 5 U.S. Op. Off. Legal Counsel 1, 1981 WL 30865 (U.S.A.G.) 93, 5 U.S. Op. Off. Legal Counsel 1, 1981 WL 30865 (U.S.A.G.) United States Attorney General ***1 *293 January 16, 1981 **1 The President The White House Washington, D.C. 20500 MY DEAR MR. PRESIDENT: You have asked my opinion concerning the scope of currently existing legal and constitutional authorities for the continuance of government functions during a temporary lapse in appropriations, such as the Government sustained on October 1, 1980. As you know, some initial determination concerning the extent of these authorities had to be made in the waning hours of the last fiscal year in order to avoid extreme administrative confusion that might have arisen from Congress' failure timely to enact 11 of the 13 anticipated regular appropriations bills, FN;B1[FN1]FN;F1 or a

377

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

.2/06 WED 17:02 FAX 423 241 3897 OIG .2/06 WED 17:02 FAX 423 241 3897 OIG -** HQ . 001 United States Government Department of Energy Department of Energy memorandum DATE: February 9, 2006 Audit Report Number: OAS-L-06-07 REPLY TO ATTN OF; IG-32 (A050R014) SUBJECT: Audit of "The Department's Management of United States Enrichment Corporation Site Services" TO: Manager, Portsmouth/Paducah Project Office INTRODUCTTON AND OBJECTIVE The Paducah Gaseous Diffusion Plant (Paducah), located in western Kentucky, was constructed by the Department of Energy (Department) in the early 1950s to enrich uranium for use in various military and commercial applications. The Department operated the plant until the Energy Policy Act of 1992 created the United States Enrichment Corporation (USEC) as a Government-owned

378

l UNITED STATES GOVERNMENT  

Office of Legacy Management (LM)

UNITED STATES GOVERNMENT UNITED STATES GOVERNMENT lb 15 SUBJECT: THORFJM PROCURENENT PMF'N:TBU Jesse C. Johnson, Gtnager of IRaw Materials Operations3s.Office 3 R. W. Cook, Director of Production ~',LL:::+ I--- DATE: MAR ! 9 1951 The following list of suppliers of thorium and the amounts of materials procured from them by the Mew York Operations Office during calendar year 1950 is being supplied in accordance with Mr. Spelmanls telephone request of March 19. Thorium Lannett Bleachery iinde Air Products Co. Lindsey Light & Chemical Co. lliscellaneous NY0 Liscensing Division Rare Earths, Inc. Wolff-Alport Total - (kilograms) 179 38,2;2 -3 4,210 /vyeoi 4 -q- 2 : i ' \ iti 1 i 0 ;;\I:' --' I F 10 i;;;?/ \ --' L & ;:I :,- :,j( EZi 5 1 :' -I I ri _ I ' R i; .- . )- .i

379

United States Geological Survey Geospatial Information Response  

E-Print Network (OSTI)

requirements, capabilities, and operations in response to a natural or man-made disaster1 United States Geological Survey Geospatial Information Response Information Response Team (GIRT) Standard Operating Procedures (SOP) contains the GIRT

Fleskes, Joe

380

Developing Rainfall Insurance Rates for the Contiguous United States  

Science Conference Proceedings (OSTI)

Historical hourly rainfall data (1950–84) were subjected to spatial and temporal analyses to provide information for developing rainfall insurance rates for the contiguous United States. The dimensions of the study illustrate a balance between ...

Stanley A. Changnon; Joyce M. Changnon

1989-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Adjustment of GCM Precipitation Intensity over the United States  

Science Conference Proceedings (OSTI)

A regression equation is developed to adjust the simulated monthly averaged intensity of hourly precipitation over the continental United States using air temperature at the first model level (about 80 m above ground) simulated by a revised ...

Mingxuan Chen; Xubin Zeng; Robert E. Dickinson

1998-09-01T23:59:59.000Z

382

Inventory of Nonutility Electric Power Plants in the United States  

Reports and Publications (EIA)

Final issue of this report. Provides annual aggregate statistics on generating units operated by nonutilities in the United States and the District of Columbia. Provides a 5-year outlook for generating unit additions and changes.

Information Center

2003-01-01T23:59:59.000Z

383

Final Report: Particulate Emissions Testing, Unit 1, Potomac...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(PM), the first during normal unit operation and the second with the injection of TRONA upstream of hot side ESP fields. All tests were completed while Unit 1 was operating...

384

DYNASTORE operating cost analysis of energy storage for a midwest utility  

DOE Green Energy (OSTI)

The objective of this project was to determine the savings in utility operating costs that could be obtained by installing a Battery Energy Storage System (BESS). The target utility was Kansas City Power and Light (KCPL), a typical Midwestern utility with a mix of generating plants and many interconnections. The following applications of battery energy storage were modeled using an Electric Power Research Institute (EPRI) developed and supported program called DYNASTORE: (1) Spinning Reserve Only (2) Load Leveling with Spinning Reserve (3) Load Leveling Only (4) Frequency Control DYNASTORE commits energy storage units along with generating units and calculates operating costs with and without energy storage, so that savings can be estimated. Typical weeks of hourly load data are used to make up a yearly load profile. For this study, the BESS power ranged from ``small`` to 300 MW (greater than the spinning reserve requirement). BESS storage time ranged from 1 to 8 hours duration (to cover the time-width of most peaks). Savings in operating costs were calculated for each of many sizes of MW capacity and duration. Graphs were plotted to enable the reader to readily see what size of BESS affords the greatest savings in operating costs.

Anderson, M.D. [Missouri Univ., Rolla, MO (United States). Dept. of Electrical Engineering; Jungst, R.G. [Sandia National Labs., Albuquerque, NM (United States)

1996-10-01T23:59:59.000Z

385

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

E-T Global Energy, LLC E-T Global Energy, LLC OE Docket No. EA-381 Order Authorizing Electricity Exports to Mexico Order No. EA-381 June 10, 2011 I. BACKGROUND E-T Global Energy, LLC Order No. EA-381 Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department ofEnergy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require authorization under section 202(e) ofthe Federal Power Act (FPA) (16 U.S.C.824a(e)) 1 * On May 10,2011, DOE received an application from E-T Global Energy, LLC (E-T Global) for authority to transmit electric energy from the United States to Mexico for five years as a power marketer using existing international transmission facilities. E-

386

United States  

Office of Legacy Management (LM)

WASHINGTON, TUESDAY, JUNE 28, 1983 @nngmeional Ruord United States of America .__ -- . . ,- PROCEEDINGS AND DEBATES OF THE 9@ CONGRESS, FIRST SESSION United States Government Printing Office SUPERINTENDENT OF DOCUMENTS Washmgton, D C 20402 OFFICIAL BUSINESS Penalty Ior pwate use. $xX Congresstonal Record (USPS 087-390) Postage and Fees Pad U S Government Prlnhng 0ffv.X 375 SECOND CLASS NEWSPAPER H.4578 ' C.QNGRESSIONAL RECORD - HOUSE June 28, 1983 H.J. Res. 273: Mr. BOUND. Mr. W~.XMAN. Mr. OBERSTAR, Mr. BEDELL. Mr. BONER of Tennessee, Mr. OWENS. Mr. DAUB, Mr. CONTE. Mr. RAHALL; Mr. GRAY, Mr. VANDER JACT. Mr. TRAKLER, and Mr. Vxrrro. H. Con. Res. 107: Mr. KASICH. Mr. AUCOIN. Mr. CARPER, and Mr. SIZHFIJER. H. Con. Res. 118: Mr. FISH. Mr. LANTOS.

387

United States  

Office of Legacy Management (LM)

ongrees;ional Record ongrees;ional Record United States of America __._ -.. I. :- PROCEEDINGS AND DEBATES OF THE 9tth CONGRESS, FIRST SESSION United States Government Printing Office SUPERINTENDENT OF DOCUMENTS Washmcqton. Cl C 20402 OFFICIAL BUSINESS Penalty Ior pwate use. $300 Congressmal Record (USPS 087-390) Postage and Fees Pad U S Governme3n:jPnntmg OfIce SECOND CLASS NEWSPAPER H.4578 ' June 28, 1983 -: I H.J. Res. 273: Mr. BOLAND, Mr. WA-. Mr. OBERSTAFC, M' r. BEDELL, Mr. BONER of Tennessee, Mr. OWENS. Mr. DAUB. Mr. CONTE. Mr. RAHALL,. Mr. GRAY, Mr. VANDER JAGT. Mr. TRAKLER. and Mr. VENTO. H. Con. Res. iO7: Mr. KASICH. Mr. ALCOIN. Mr. CARPER. and Mr. SCHEUER. H. Con. Res. 118: Mr. FISH, Mr. LANTOS. Mr. KILDEE. Mr. SOLARZ Mr. Bmrr, Mr. BELWLL, Mr. RANG~L, Mr. DYMALLY. Mr.

388

The Influence of Variations in Surface Treatment on 24-Hour Forecasts with a Limited Area Model, Including a Comparison of Modeled and Satellite-Measured Surface Temperatures  

Science Conference Proceedings (OSTI)

The effect of variations in surface parameters on 24-hour limited area forecasts has been examined on a day in July 1981. The vehicle for the study is a ten-level primitive equation model covering most of the continental United States. Variations ...

George Diak; Stacey Heikkinen; John Rates

1986-01-01T23:59:59.000Z

389

Customer Strategies for Responding to Day-Ahead Market HourlyElectricity Pricing  

Science Conference Proceedings (OSTI)

Real-time pricing (RTP) has been advocated as an economically efficient means to send price signals to customers to promote demand response (DR) (Borenstein 2002, Borenstein 2005, Ruff 2002). However, limited information exists that can be used to judge how effectively RTP actually induces DR, particularly in the context of restructured electricity markets. This report describes the second phase of a study of how large, non-residential customers' adapted to default-service day-ahead hourly pricing. The customers are located in upstate New York and served under Niagara Mohawk, A National Grid Company (NMPC)'s SC-3A rate class. The SC-3A tariff is a type of RTP that provides firm, day-ahead notice of hourly varying prices indexed to New York Independent System Operator (NYISO) day-ahead market prices. The study was funded by the California Energy Commission (CEC)'s PIER program through the Demand Response Research Center (DRRC). NMPC's is the first and longest-running default-service RTP tariff implemented in the context of retail competition. The mix of NMPC's large customers exposed to day-ahead hourly prices is roughly 30% industrial, 25% commercial and 45% institutional. They have faced periods of high prices during the study period (2000-2004), thereby providing an opportunity to assess their response to volatile hourly prices. The nature of the SC-3A default service attracted competitive retailers offering a wide array of pricing and hedging options, and customers could also participate in demand response programs implemented by NYISO. The first phase of this study examined SC-3A customers' satisfaction, hedging choices and price response through in-depth customer market research and a Constant Elasticity of Substitution (CES) demand model (Goldman et al. 2004). This second phase was undertaken to answer questions that remained unresolved and to quantify price response to a higher level of granularity. We accomplished these objectives with a second customer survey and interview effort, which resulted in a higher, 76% response rate, and the adoption of the more flexible Generalized Leontief (GL) demand model, which allows us to analyze customer response under a range of conditions (e.g. at different nominal prices) and to determine the distribution of individual customers' response.

Goldman, Chuck; Hopper, Nicole; Bharvirkar, Ranjit; Neenan,Bernie; Boisvert, Dick; Cappers, Peter; Pratt, Donna; Butkins, Kim

2005-08-25T23:59:59.000Z

390

Operations & Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates Operations & Maintenance Operations OASIS: WACM (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) wesTTrans Common...

391

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CC-1-I Availability: This rate schedule shall be available to public bodies and cooperatives served through the facilities of Carolina Power & Light Company, Western Division (hereinafter called the Customers). Applicability: This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating

392

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tenaslta Power Services Co. Tenaslta Power Services Co. OE Docket No. EA-243-A Order Authorizing Electricity Exports to Canada Order No. EA-243-A March 1,2007 Tenaska Power Services Co. Order No. EA-243-A I. BACKGROUND Exports of elcctricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 30 I(b) and 402(f) of the Departrncnt of' Energy Organizatio~l Act (42 U, S.C. 7 15 1 (b), 7 1 72Cf)) and rcquirc authorization under section 202(e) of the Federal Power Act (FPA) ( Z 6 U. s.c.824a(e)j1. On August 16,2001, DOE issued Order No. EA-243 authorizing Tenaska Power Scrvices Co. (Tenaska) to transmit electric cncrgy from the United States to Canada as a power marketer. That authority expired on August 16,2003. On August 14,2006, Teilaska applied to renew the electricity export authority

393

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TexMex Energy, LLC TexMex Energy, LLC OE Docket No. EA-294-A Order Authorizing Electricity Exports to Mexico Order No. EA-294-A February 22, 2007 TexMex Energy, LLC Order No. EA-294-A I. BACKGROUND Exports of electricity from the United States to a foreign count~y are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department of Energy Organization Act (42 U.S.C. 7 15 1 (b), 71 72(f)) and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C.824a(e)) . On August 25,2004, DOE issued Order No. EA-294 authorizing TexMex Energy LLC (TexMex) to transmit electric energy fiom the United States to Mexico as a power marketer. That authority expired on August 25, 2006. On September 8, 2006, TexMex applied to renew the electricity export authority

394

United States  

Gasoline and Diesel Fuel Update (EIA)

United States United States Coal ................................................ 4,367 4,077 4,747 4,181 4,473 4,125 4,983 4,330 4,414 4,003 4,796 4,178 4,344 4,479 4,348 Natural Gas .................................... 2,802 2,843 3,694 2,863 2,713 2,880 3,636 2,707 2,792 2,972 3,815 2,849 3,052 2,986 3,109 Petroleum (a) .................................. 74 73 81 67 73 70 75 66 75 70 76 66 74 71 71 Other Gases ................................... 32 33 36 32 32 34 37 33 33 35 39 34 33 34 35 Nuclear ........................................... 2,176 2,044 2,257 2,170 2,106 2,037 2,167 2,010 2,144 2,074 2,206 2,055 2,162 2,080 2,120 Renewable Energy Sources: Conventional Hydropower ........... 736 886 716 633 765 887 708 646 767 919 729 659 742 751 768 Wind ............................................ 491 520 353 449 477 521 379 475

395

Report for Batch Leach Analyses on Sediments at 100-HR-3 Operable Unit, Boreholes C7620, C7621, C7622, C7623, C7626, C7627, C7628, C7629, C7630, and C7866. Revision 1.  

Science Conference Proceedings (OSTI)

This is a revision to a previously released report. This revision contains additional analytical results for the sample with HEIS number B2H4X7. Between November 4, 2010 and October 26, 2011 sediment samples were received from 100-HR-3 Operable Unit for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL. Samples were received with a chain of custody (COC) and were analyzed according to the sample identification numbers supplied by the client. All Samples were refrigerated upon receipt until prepared for analysis. All samples were received with custody seals intact unless noted in the Case Narrative. Holding time is defined as the time from sample preparation to the time of analyses. The prescribed holding times were met for all analytes unless noted in the Case Narrative. All reported analytical results meet the requirements of the CAW or client specified SOW unless noted in the case narrative. Due to the requirements of the statement of work and sampling events in the field, the 28 day and the 48 hr requirements cannot be met. The statement of work requires samples to be selected at the completion of the borehole. It is not always possible to complete a borehole and have the samples shipped to the laboratory within the hold time requirements. Duplicate RPD for Uranium 238 (38.9%) was above the acceptance limit (35) in 1E05003-DUP1 for ICPMS-Tc-U-WE The sample result is less than 10 times the detection limits. Duplicate recoveries are not applicable to this analyte. Duplicate RPD for Silver 107 (68.2%) was above the acceptance limit (35) in 2C06004-DUP1 for ICPMS-RCRA-AE The sample result is less than 10 times the detection limits. Duplicate recoveries are not applicable to this analyte. Matrix Spike Recovery for Chromium, Hexavalent (48.8%) was outside acceptance limits (75-125) in 1E23001-MS1 for Hexavalent Chromium/Soil. Potential Matrix interference. Sample results associated with this batch are below the EQL. There should be no impact to the data as reported. Matrix Spike Recovery for Chromium, Hexavalent (50.2%) was outside acceptance limits (75-125) in 2B22010-MS1 for Hexavalent Chromium/Soil. Potential Matrix interference. Sample results associated with this batch are below the EQL. There should be no impact to the data as reported.

Lindberg, Michael J.

2012-04-25T23:59:59.000Z

396

Estimating Hourly All-Sky Solar Irradiation Components from Meteorological Data  

Science Conference Proceedings (OSTI)

A new method to calculate hourly direct beam and diffuse irradiation on a horizontal surface using 3-h standard meteorological data is described. Comparisons of computed and observed irradiations are made with hourly data obtained in Carpentras ...

F. Kermel

1988-02-01T23:59:59.000Z

397

NOAA Awarded 2.6 Million Processor Hours at NERSC to Run Climate...  

NLE Websites -- All DOE Office Websites (Extended Search)

NOAA Awarded 2.6 Million Processor Hours at NERSC to Run Climate Change Models NOAA Awarded 2.6 Million Processor Hours at NERSC to Run Climate Change Models September 11, 2008...

398

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pump-2 Pump-2 Availability: This rate schedule shall be available to public bodies and cooperatives who provide their own scheduling arrangement and elect to allow Southeastern to use a portion of their allocation for pumping (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. Applicability: This rate schedule shall be applicable to the sale at wholesale energy generated from pumping operations at the Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This energy will be segregated from energy from other pumping operations.

399

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-A 1-A Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. Applicability: This rate schedule shall be applicable to the sale at wholesale energy generated from pumping operations at the Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. The energy will be segregated from energy from other pumping operations. Character of Service: The energy supplied hereunder will be delivered at the delivery points provided for under appropriate contracts between the Government and the Customer.

400

Transition to 12-hour shifts - The process and the product  

Science Conference Proceedings (OSTI)

This paper examines Yankee Atomic Electric Company's (YAEC's) transition to a 12-h shift schedule for the operations department staff. It presents the approach to implementation, reactions of both shift workers and management to the new schedule (including perceived benefits and shortcomings), and provides recommendations to others considering this change. Experience demonstrates the ease of any transition when the desire for change originates with the individuals directly affected. Close cooperation with any union representation is also vital to its success. When all parties are in apparent agreement (e.g., that a 12-h rotation should commence), this allows for a trial period (in this case of at least two shift cycles) in order to evaluate and refine the program, thus leaving the option open to revert back to the previous condition if things prove unsatisfactory. At all costs, mutual respect must be maintained for all parties.

Suter, P. (Yankee Atomic Electric Co., Rowe, MA (United States))

1992-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CTV-1-H Availability: This rate schedule shall be available to the Tennessee Valley Authority (hereinafter called TVA). Applicability: This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland Projects") and the Laurel Project sold under agreement between the Department of Energy and TVA. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating current at a frequency of approximately 60 hertz at the outgoing terminals of the Cumberland

402

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CTVI-1-A Availability: This rate schedule shall be available to customers (hereinafter called the Customer) who are or were formerly in the Tennessee Valley Authority (hereinafter called TVA) service area. Applicability: This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland Projects") and the Laurel Project sold under agreement between the Department of Energy and the Customer. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating

403

UNITED STATES  

Office of Legacy Management (LM)

f).~<~~ \--\c :y-,ai F p"- KG f).~<~~ \--\c :y-,ai F p"- KG WASHINOTDN 28.0. C. ' -lr ' \ ' ' --- ".I ?--" ' z I. .~;-4.' J frr*o& 2 ii, - - -4 70-147 LRL:JCD JAN !! 8 1958 Oregon Metallurgical Corporation P. 0. Box 484 Albany, Oregon Attention: Mr. Stephen M. Shelton General Manager Gentlemen: Enclosed is Special Nuclear Material License No. SNM-144, as amended. Very 33uly yours, r:; I,;, ll)~gQ""d".- Lyall Johnson Chief, Licensing Branch Division of Licensing & Regulation Enclosure: SNM-144, as amended Distribution: bRO0 Attn: Dr. H.M.Roth DFMusser NMM MMMann INS JCRyan FIN (2) HSteele LRL SRGustavson LRL Document room Formal file Suppl. file Br & Div rf's ' .b liwwArry s/VW- ' q+ ' yj/ 2; 2-' , COP' 1 J JAM01958 -- UNITED STATES ATOMIC ENERGY COMMISSION

404

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule JW-2-F Availability: This rate schedule shall be available to the Florida Power Corporation (or Progress Energy Florida, hereinafter called the Company). Applicability: This rate schedule shall be applicable to electric energy generated at the Jim Woodruff Project (hereinafter called the Project) and sold to the Company in wholesale quantities. Points of Delivery: Power sold to the Company by the Government will be delivered at the connection of the Company's transmission system with the Project bus. Character of Service: Electric power delivered to the Company will be three-phase alternating current at a nominal frequency of 60 cycles per second.

405

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

uv /uu/u* ±.u.. J.OJ..L rAA , *. . uv /uu/u* ±.u.. J.OJ..L rAA , *. . 'A4 .. ± OO, I U444 flmI I.j102 ' -f- $I)002 EP<.1 (o-.vu) United States Government Department of Energy memorandum DATE: January 30, 2004 REP.YTO: IG-35 (A03DN039) Audit Report No.: OAS-L-04-10 SUBJECT: Audit of the Safeguards and Security Program at the Rocky Flats Environmental Technology Site To: Frazer Lockhart, Manager, Rocky Flats Field Office INTRODUCTION AND OBJECTIVE Because of the terrorist attacks against the United States on September 11, 2001, the Department of Energy (Department) instituted additional security requirements beyond those already in place for normal security operations. These "Security Conditions" requirements were established by Department Notice 473.8 (Notice). The requirements are based on

406

Energy Calculator- Common Units and Conversions  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Calculator - Common Units and Conversions Energy Calculator - Common Units and Conversions Calculators for Energy Used in the United States: Coal Electricity Natural Gas Crude Oil Gasoline Diesel & Heating Oil Coal Conversion Calculator Short Tons Btu Megajoules Metric Tons Clear Calculate 1 Short Ton = 20,169,000 Btu (based on U.S. consumption, 2007) Electricity Conversion Calculator KilowattHours Btu Megajoules million Calories Clear Calculate 1 KilowattHour = 3,412 Btu Natural Gas Conversion Calculator Cubic Feet Btu Megajoules Cubic Meters Clear Calculate 1 Cubic Foot = 1,028 Btu (based on U.S. consumption, 2007); 1 therm = 100,000 Btu; 1 terajoule = 1,000,000 megajoules Crude Oil Conversion Calculator Barrels Btu Megajoules Metric Tons* Clear Calculate 1 Barrel = 42 U.S. gallons = 5,800,000 Btu (based on U.S. consumption,

407

Geothermal: Sponsored by OSTI -- Regional operation research...  

Office of Scientific and Technical Information (OSTI)

operation research program for development of geothermal energy in the southwest United States. Final technical report, June 1977--August 1978 Geothermal Technologies Legacy...

408

Field Operation Program - Neighborhood Electric Vehicle Fleet...  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Neighborhood Electric Vehicle Fleet Use J. Francfort M. Carroll July 2001 United States Department of Energy INEELEXT-01-00864 Field Operations Program...

409

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-B 3-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be scheduled pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. The Government is responsible for providing the scheduling. The Customer is responsible for providing a transmission arrangement. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule. Applicability:

410

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-B 1-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted and scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule is applicable to customers receiving power from the Government on an arrangement where the Company schedules the power and provides the Customer a credit on their bill for Government power. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an

411

AVESTAR® - Training - Gasification Process Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Gasification Process Operations Gasification Process Operations This course is designed as a familiarization course to increase understanding of the gasification with CO2 capture process. During the training, participants will startup and shutdown the simulated unit in an integrated manner and will be exposed to simple and complex unit malfunctions in the control room and in the field. Course objectives are as follows: Introduce trainees to gasification and CO2 capture process systems and major components and how they dynamically interact Familiarize trainees with the Human Machine Interface (HMI) and plant control and how safe and efficient operation of the unit can be affected by plant problems Provide the trainees with hands-on operating experiences in plant operations using the HMI

412

Operations of the National Severe Storms Forecast Center  

Science Conference Proceedings (OSTI)

The National Severe Storms Forecast Center in Kansas City, Missouri, is composed of several operational forecasting units, all national in scope. It includes the Severe Local Storms Unit (SELS), the National Aviation Weather Advisory Unit (NAWAU),...

Frederick P. Ostby

1992-12-01T23:59:59.000Z

413

Question of the Week: How Are You Observing Earth Hour? | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Are You Observing Earth Hour? Are You Observing Earth Hour? Question of the Week: How Are You Observing Earth Hour? March 26, 2009 - 12:16pm Addthis This Saturday, March 28th, people around the world will observe Earth Hour at 8:30 p.m. local time-whatever the local time zone happens to be-by switching off their lights for one hour. While many people are taking part by simply shutting off their lights and lighting some candles, some communities are hosting gatherings or events around Earth Hour. How are you observing Earth Hour? Each Thursday, you have the chance to share your thoughts on a topic related to energy efficiency or renewable energy for consumers. Please e-mail your responses to the Energy Saver team at consumer.webmaster@nrel.gov. Addthis Related Articles Question of the Week: How Will You Save Energy this Spring?

414

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OEF 1325.8 OEF 1325.8 (U8-93) United States Government Department of Energy memorandum DATE: April 11, 2007 Audit Report Number: OAS-L-07-I1 REPLY TO ATTN OF: IG-32 (A07DN056) SUSJECT: Audit of the Department of Energy's Community and Regulatory Support Funding at the Richland Operations Office TO: Manager, Richland Operations Office INTRODUCTION AND OBJECTIVE The Department of Energy's (Department) Office of Environmental Management provided $60.1 million in Community and Regulatory Support funding in Fiscal Year (FY) 2005 to a number of Departm- nt sites. The funding is intended to be used for activities indirectly related to nuclear and hazardous waste cleanup, such as agreements with state regulatory agencies and transportation departments. During FY 2005, the Department's Richland

415

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-93) -93) United States Government Department of Energy memorandum DATE: July 12, 2007 Audit Report Number: OAS-L-07-15 REPLY TO ATnN OF: IG-32 (A07ID055) SUBJECr: Audit of the Idaho National Laboratory Facility Footprint Reduction TO: Manager, Idaho Operations Office INTRODUCTION AND OBJECTTVE On February 1, 2005, Battelle Energy Alliance, LLC (BEA) assumed responsibility for managing and operating the Idaho National Laboratory (INL) for the Department of Energy (Department) under a new 10 year contract. ThI m.ion for ,the L s to nntance the Nation's energy security by becoming the preeminent, internationally recognized nuclear energy research, development, and demonstration laboratory.. To accomplish this mission, BEA proposed aggressive infrastructure initiatives

416

United States Government Departmen  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7/05 TUE 07:58 FAX 423 241 3897 OIG -** HQ @]002 7/05 TUE 07:58 FAX 423 241 3897 OIG -** HQ @]002 DOE F 1325.8 (08-93) United States Government Departmen of Energy memorandum DATE: December 20, 2005 Audit Report Number: OAS-L-06-03 REPLY TO A1TN OF; IG-36 (A05SR025) SUBJECT: Audit of "Defense Waste Processing Facility Operations at the Savannah River Site" TO: Jeffrey M. Allison, Manager, Savannah River Operations Office INTRODUCTION AND OBJECTIVE The Department of Energy's (Department) Savannah River Site stores approximately 36 million gallons of liquid, high-level radioactive waste in 49 underground waste storage tanks. The contents of the waste tanks are broadly characterized as either "sludge waste" or "salt waste". Sludge waste is insoluble and settles to the bottom of a waste tank, beneath a layer of liquid supernate. Salt

417

UNITED STATES GOVERNMENT  

Office of Legacy Management (LM)

'.... '|le , * f C. '.... '|le , * f C. Office Memorandum · UNITED STATES GOVERNMENT .-- J TO ' Leo Graup, Chief, DATE: September 29, 1958 Property Management Branch rFi0 : M. S. Weinstein Industrial Hygiene Branch, HASL SUBJBT: SURVEY AT HAIST PROPETIY SYMBOL: HSH:MSW. Thisl property was purchased during MED operation and used as a dumping ground for refinery residues generated by Linde Air Products during their period of participation in the refinery operations program. \It 2 consists of 10 acres in addition to a perpetual .ease- ment right to a strip of land, 10 feet wide and 3600 feet long. The area is located in North Tonawanda, New York near the Niagara River. Because of the growth of adjacent industries, this particular piece of property has appreciated in value. During its tenure as responsible property management office, Oak

418

United States Government Memorandum  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8/16/07 09:15 FAX 301 903 4656 CAPITAL REGION 8/16/07 09:15 FAX 301 903 4656 CAPITAL REGION * 002 DOE F 1325.8 (08-93) Department of Energy United States Government Memorandum DATE: August 15, 2007 Audit Report Number: OAS-L-07-22 REPLY TO ATTN OF: IG-34 (A06GT006) SUBJECT: Report on "Hazardous Chemicals Inventory Management at the Savannah River Site" TO: Manager, Savannah River Operations Office BACKGROUND The Savannah River Site (Savannah River) maintains large inventories of hazardous chemicals for its scientific, environmental cleanup and production operations. Many of these chemicals are known carcinogens; some are corrosive, while others are highly flammable. As such, these chemicals can pose serious health and safety risks to workers and members of the public, the environment, and to emergency first responders if not properly managed and controlled.

419

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3/02 TUE 08:59 FAX 423 241 3897 OIG *-* HQ 00o2 3/02 TUE 08:59 FAX 423 241 3897 OIG *-* HQ 00o2 DOE F 132,.8 W.I: ((07.9u) United States Government Department of Energy Memorandum DATE: December 2, 2002 REPLY TO REPLY TO -36 (A02SR013) Audit Report No.: OAS-L-03-07 ATTN OF: SUBJECT: Audit of Subcontracting Practices at the Savannah River Site TO: Jeffrey M. Allison, Acting Manager, Savannah River Operations Office INTRODUCTION AND OBJECTIVE The Department of Energy (Department) has contracted with Westinghouse Savannah River Company, LLC (Westinghouse) to manage and operate the Savannah River Site (Savannah River) through September 30, 2006. As of August 2, 2002, Westinghouse had 534 open and active service procurements worth $100,000 or more each, with a total value of about $518 million, that it had awarded since October 1996.

420

meeting summary: Second Northeast Regional Operational Workshop  

Science Conference Proceedings (OSTI)

The Second Northeast Regional Operational Workshop, focusing on hydrometeorology in the northeastern United States, was held 7–8 November 2000 in Albany, New York. Sessions in cold season events, warm season events, and operational techniques ...

Eugene P. Auciello

2001-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MISS-1-N MISS-1-N Availability: This rate schedule shall be available to the South Mississippi Electric Power Association (hereinafter called the Customer) to whom power may be wheeled pursuant to contracts between the Government and PowerSouth Energy Cooperative (hereinafter called PowerSouth). Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does not apply to energy from pumping operations at the Carters and Richard B. Russell Projects.

422

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ALA-1-N ALA-1-N Availability: This rate schedule shall be available to the PowerSouth Energy Cooperative (hereinafter called the Cooperative). Applicability: This rate schedule shall be applicable to power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters, and Richard B. Russell Projects and sold under contract between the Cooperative and the Government. This rate schedule does not apply to energy from pumping operations at the Carters and Richard B. Russell Projects. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating current at a nominal frequency of 60 Hertz and shall be delivered at the

423

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-B 2-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. The Customer has chosen to self-schedule and does not receive Government power under an arrangement where the Company schedules the power and provides a credit on the Customer's bill for Government power. The Customer is responsible for providing a scheduling arrangement with the Government. The Government is responsible for arranging transmission with the Company. Nothing in this

424

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-B 2-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. The Customer has chosen to self-schedule and does not receive Government power under an arrangement where the Company schedules the power and provides a credit on the Customer's bill for Government power. The Customer is responsible for providing a scheduling arrangement with the Government. The Government is responsible for arranging transmission with the Company and PJM.

425

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VA-1-B VA-1-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted and scheduled pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule is applicable to customers receiving power from the Government on an arrangement where the Company schedules the power and provides the Customer a credit on their bill for Government power. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow

426

United States | OpenEI Community  

Open Energy Info (EERE)

United States United States Home Graham7781's picture Submitted by Graham7781(1992) Super contributor 16 August, 2013 - 12:21 New report from White House outlines largest problems facing United States energy grid energy grid OpenEI President Smart Grid United States White House Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 Commercial and Residential Hourly Load Data Now Available on OpenEI! building load building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL Files: application/zip icon System Advisor Model Tool for Downloading Load Data Graham7781's picture Submitted by Graham7781(1992) Super contributor 29 October, 2012 - 14:46 East Coast Utilities prepare for Hurricane Sandy

427

OPERATIONS (OPS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPS) OPS) OBJECTIVE OPS.1 The formality and discipline of operations is adequate to conduct work safely and programs are in place to maintain this formality and discipline. (CR 13) Scope: The Conduct of Operations Program was evaluated during the recent KE Basin FTS ORR and was found to be adequately implemented. Based on this result and the subsequent program enhancements, the scope of the review is to be limited to the SWS operating and maintenance evolutions. Criteria * Programmatic elements of conduct of operations are in place for SWS operations. (DOE Order 5480.19) * The SWS operations personnel adequately demonstrate the principles of conduct of operations requirements during the shift performance period. (DOE Order 5480.19)

428

A Neural Networks–Based Fusion Technique to Estimate Half-Hourly Rainfall Estimates at 0.1° Resolution from Satellite Passive Microwave and Infrared Data  

Science Conference Proceedings (OSTI)

The purpose of this paper is to evaluate a new operational procedure to produce half-hourly rainfall estimates at 0.1° spatial resolution. Rainfall is estimated using a neural networks (NN)–based approach utilizing passive microwave (PMW) and ...

Francisco J. Tapiador; Chris Kidd; Vincenzo Levizzani; Frank S. Marzano

2004-04-01T23:59:59.000Z

429

Annual Operation of Selective Catalytic Reduction Systems  

Science Conference Proceedings (OSTI)

In 2009, many coal-fired generating units equipped with selective catalytic reduction (SCR) systems for nitrogen oxide (NOX) control will convert from seasonal to annual SCR operation. This report provides guidelines on how to prepare for annual operation. It focuses on existing experience with annual operation, catalyst management strategy, equipment reliability, cold weather issues, low load and cycling operation, and risk assessment.

2007-12-18T23:59:59.000Z

430

Government Operation  

Science Conference Proceedings (OSTI)

Use Cases from NBD(NIST Big Data) Requirements WG V1.0. http://bigdatawg. nist.gov/home.php. Contents. Blank Template. Government Operation ...

2013-09-07T23:59:59.000Z

431

Operations Research  

E-Print Network (OSTI)

Mar 1, 2005 ... Operations Research. Report 2005-01. On a closedness theorem. Miklós Ujvári. Marc 2005. Eötvös Loránd University of Sciences. Department ...

432

Operating Instructions  

Science Conference Proceedings (OSTI)

... The system operation is center around 3 areas of the equipment 1) Deposition chamber 2) Vaporizer 3) Chiller/cold finger ...

2013-01-18T23:59:59.000Z

433

Earth Hour 2009: March 28, 8:30-9:30 PM Local Time | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Earth Hour 2009: March 28, 8:30-9:30 PM Local Time Earth Hour 2009: March 28, 8:30-9:30 PM Local Time Earth Hour 2009: March 28, 8:30-9:30 PM Local Time March 27, 2009 - 6:00am Addthis John Lippert The city of Greenbelt, Maryland, where I live, is living up to its "green" name by participating in Earth Hour. This global event asks everyone to "go dark" for an hour to make a powerful statement of concern about climate change. The city will be turning off all non-essential lights in municipal buildings. Residents are requested to turn off their lights (and other energy-consuming appliances). The Greenbelt Advisory Committee on Environmental Sustainability, which advises the mayor and city council and which I chair, will be sponsoring a flashlight walk around Old Greenbelt during Earth Hour. My wife and I will

434

Earth Hour 2009: March 28, 8:30-9:30 PM Local Time | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Earth Hour 2009: March 28, 8:30-9:30 PM Local Time Earth Hour 2009: March 28, 8:30-9:30 PM Local Time Earth Hour 2009: March 28, 8:30-9:30 PM Local Time March 27, 2009 - 6:00am Addthis John Lippert The city of Greenbelt, Maryland, where I live, is living up to its "green" name by participating in Earth Hour. This global event asks everyone to "go dark" for an hour to make a powerful statement of concern about climate change. The city will be turning off all non-essential lights in municipal buildings. Residents are requested to turn off their lights (and other energy-consuming appliances). The Greenbelt Advisory Committee on Environmental Sustainability, which advises the mayor and city council and which I chair, will be sponsoring a flashlight walk around Old Greenbelt during Earth Hour. My wife and I will

435

Customer Strategies for Responding to Day-Ahead Market Hourly Electricity Pricing  

E-Print Network (OSTI)

facilities that receive electricity service from Niagaraperiods is your facility’s electricity use highest? ( CHECKthe next day’s hourly electricity prices? ( CHECK ONLY ONE )

2005-01-01T23:59:59.000Z

436

Customer Strategies for Responding to Day-Ahead Market Hourly Electricity Pricing  

E-Print Network (OSTI)

next day’s hourly electricity prices? ( CHECK ONLY ONE ) 1.to Real Time Electricity Prices, Unpublished Manuscript atahead Wholesale Market Electricity Prices: Case Study of RTP

2005-01-01T23:59:59.000Z

437

Customer Strategies for Responding to Day-Ahead Market Hourly Electricity Pricing  

E-Print Network (OSTI)

nature of electric service and usage, defining the hoursElectric. 12 The resulting evaluation report estimated elasticities and found measurable reductions in energy usage

2005-01-01T23:59:59.000Z

438

Intra-hour Direct Normal Irradiance solar forecasting using genetic programming  

E-Print Network (OSTI)

UNIVERSITY OF CALIFORNIA, SAN DIEGO Intra-hour Direct NormalChair University of California, San Diego iii TABLE OFRPS,” Technical report, California Independent System

Queener, Benjamin Daniel

2012-01-01T23:59:59.000Z

439

Operations research  

Science Conference Proceedings (OSTI)

In Evita, Andrew Lloyd Webber and Tim Rice wrote: Politics, the Art of the Possible. To those of us in the operations research community, we postulate: Operations Research, the Science of Better - (i.e. better processes, better systems and better decisions). ...

William P. Pierskalla

2009-01-01T23:59:59.000Z

440

Operation crosscheck  

SciTech Connect

This report consists of three sections covering the three major areas of Lawrence Livermore Laboratory`s participation in Operation Crosscheck. These areas are: Diagnostic Aircraft; Radiochemical Sampling; and Device Assembly and Handling, Barbers Point. The information contained in these sections has been extracted from Crosscheck post-operation reports.

Gilbert, F. C.

1964-11-06T23:59:59.000Z

Note: This page contains sample records for the topic "units operating hours" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

After-hours Power Status of Office Equipment and Inventory of Miscellaneous Plug-load Equipment  

Science Conference Proceedings (OSTI)

This research was conducted in support of two branches of the EPA ENERGY STAR program, whose overall goal is to reduce, through voluntary market-based means, the amount of carbon dioxide emitted in the U.S. The primary objective was to collect data for the ENERGY STAR Office Equipment program on the after-hours power state of computers, monitors, printers, copiers, scanners, fax machines, and multi-function devices. We also collected data for the ENERGY STAR Commercial Buildings branch on the types and amounts of ''miscellaneous'' plug-load equipment, a significant and growing end use that is not usually accounted for by building energy managers. This data set is the first of its kind that we know of, and is an important first step in characterizing miscellaneous plug loads in commercial buildings. The main purpose of this study is to supplement and update previous data we collected on the extent to which electronic office equipment is turned off or automatically enters a low power state when not in active use. In addition, it provides data on numbers and types of office equipment, and helps identify trends in office equipment usage patterns. These data improve our estimates of typical unit energy consumption and savings for each equipment type, and enables the ENERGY STAR Office Equipment program to focus future effort on products with the highest energy savings potential. This study expands our previous sample of office buildings in California and Washington DC to include education and health care facilities, and buildings in other states. We report data from twelve commercial buildings in California, Georgia, and Pennsylvania: two health care buildings, two large offices (> 500 employees each), three medium offices (50-500 employees), four education buildings, and one ''small office'' that is actually an aggregate of five small businesses. Two buildings are in the San Francisco Bay area of California, five are in Pittsburgh, Pennsylvania, and five are in Atlanta, Georgia.

Roberson, Judy A.; Webber, Carrie A.; McWhinney, Marla C.; Brown, Richard E.; Pinckard, Margaret J.; Busch, John F.

2004-01-22T23:59:59.000Z

442

NEUTRONIC REACTOR CONSTRUCTION AND OPERATION  

DOE Patents (OSTI)

A method is given for operating a nuclear reactor having a negative coefficient of reactivity to compensate for the change in reactor reactivity due to the burn-up of the xenon peak following start-up of the reactor. When it is desired to start up the reactor within less than 72 hours after shutdown, the temperature of the reactor is lowered prior to start-up, and then gradually raised after start-up.

West, J.M.; Weills, J.T.

1960-03-15T23:59:59.000Z

443

When was the last refinery built in the United States? - FAQ ...  

U.S. Energy Information Administration (EIA)

When was the last refinery built in the United States? There were a total of 143 operable petroleum refineries in the United States as of January 1, 2013.

444

Operating Reserve Reductions from a Proposed Energy Imbalance Market with Wind and Solar Generation in the Western Interconnection  

DOE Green Energy (OSTI)

This paper considers several alternative forms of an energy imbalance market (EIM) proposed in the nonmarket areas of the Western Interconnection. The proposed EIM includes two changes in operating practices that independently reduce variability and increase access to responsive resources: balancing authority cooperation and sub-hourly dispatch. As the penetration of variable generation increases on the power system, additional interest in coordination would likely occur. Several alternative approaches could be used, but consideration of any form of coordinated unit commitment is beyond the scope of this analysis. This report examines the benefits of several possible EIM implementations--both separately and in concert.

King, J.; Kirby, B.; Milligan, M.; Beuning, S.

2012-05-01T23:59:59.000Z

445

ANALYSIS OF THE QUALITY OF SERVICES FOR CHECKOUT OPERATION IN ICA SUPERMARKET USING QUEUING THEORY  

E-Print Network (OSTI)

This paper describes a queuing model for a single server process. This model is developed for a checkout sales operation in ICA supermarket, Borlange. The model contains one server which is checkout sales counter area. This server consists of a series of Queues. In any service system, a queue forms whenever current demand exceeds the existing capacity to serve. This occurs when the checkout operation unit is too busy to serve the arriving costumers, immediately. After the office hours, in which arrivals of customers occur at varying times hence the service times also vary accordingly, the chances of number of customers may increase. This paper contains the analysis of Quality service of supermarket account service unit. One of the expected gains from studying queuing systems is to make the services more efficient in terms of resources utilization, hence eliminating the queues so customers will not have to wait when servers are too busy. In other words, trying to detect the variability in service and time, and eliminate that variability to improve the quality of the services where required, is the aim of our research paper. This study requires an empirical data which may include the variables like, Arrival Time in the checkout operating unit, Departure Time, etc. A questionnaire is developed to collect the data for such variables and the reaction of the ICA Supermarket from the customers separately. TABLE OF CONTENTS

Azmat Nafees; Liwen Liang; M. Sc; Presented To Supervisor Richard Stridbek; Azmat Nafees; Liwen Liang; Professor Richard Stridbek

2006-01-01T23:59:59.000Z

446

Quantification of Variability and Uncertainty in Hourly NOx Emissions from Coal-Fired Power Plants  

E-Print Network (OSTI)

1 Quantification of Variability and Uncertainty in Hourly NOx Emissions from Coal-Fired Power to quantify variability and uncertainty for NOx emissions from coal-fired power plants. Data for hourly NOx Uncertainty, Variability, Emission Factors, Coal-Fired Power Plants, NOx emissions, Regression Models

Frey, H. Christopher

447

Multi-hour network planning based on domination between sets of traffic matrices  

Science Conference Proceedings (OSTI)

In multi-hour network design, periodic traffic variations along time are considered in the dimensioning process. Then, the non coincidence of traffic peaks along the day or the week can be exploited. This paper investigates the application of the traffic ... Keywords: Multi-hour traffic, Network planning, Traffic domination

P. Pavon-Marino; B. Garcia-Manrubia; R. Aparicio-Pardo

2011-02-01T23:59:59.000Z

448

Optimal Multi-scale Capacity Planning under Hourly Varying Electricity Prices  

E-Print Network (OSTI)

1 Optimal Multi-scale Capacity Planning under Hourly Varying Electricity Prices Sumit Mitra Ignacio;2 Motivation of this work · Deregulation of the electricity markets caused electricity prices to be highly? (retrofit) · Challenge: Multi-scale nature of the problem! Hourly varying electricity prices vs. 10-15 years

Grossmann, Ignacio E.

449

Cloudy Sky Version of Bird's Broadband Hourly Clear Sky Model (Presentation)  

DOE Green Energy (OSTI)

Presentation on Bird's Broadband Hourly Clear Sky Model given by NREL's Daryl Myers at SOLAR 2006. The objective of this report is to produce ''all sky'' mo